WorldWideScience

Sample records for pre-operational pump testing

  1. Operation and control strategies in pre-series testing of cold circulating pumps for ITER

    International Nuclear Information System (INIS)

    Bhattacharya, R.; Vaghela, H.; Sarkar, B.; Srinivas, M.; Choukekar, K.

    2013-01-01

    Cryo-distribution system of ITER is responsible for the distribution and control of forced-flow supercritical helium for cooling of the superconducting magnets and the cryo-pumps. The requirements of cold circulating pumps (CCP) for mass flow rates and performance are much higher than presently existing and commercially available one used at 4.0 K helium. Design up-scaling with pre-series test of CCP has been proposed including test infrastructure. Operation and control strategies for the test distribution box (TDB) of test infrastructure have been developed and analyzed using steady state and dynamic process simulation to cope with the functional requirements of CCPs. Off-normal scenario with CCP inlet pressure variation is an important concern, dynamic process responses during such scenario have been evaluated to verify the operability of CCP. The paper describes process simulation to cope with the functional requirements of CCPs along with evaluation of off-normal scenario to verify the operability of CCP. (author)

  2. A well test analysis method accounting for pre-test operations

    International Nuclear Information System (INIS)

    Silin, D.B.; Tsang, C.-F.

    2003-01-01

    We propose to use regular monitoring data from a production or injection well for estimating the formation hydraulic properties in the vicinity of the wellbore without interrupting the operations. In our approach, we select a portion of the pumping data over a certain time interval and then derive our conclusions from analysis of these data. A distinctive feature of the proposed approach differing it form conventional methods is in the introduction of an additional parameter, an effective pre-test pumping rate. The additional parameter is derived based on a rigorous asymptotic analysis of the flow model. Thus, we account for the non-uniform pressure distribution at the beginning of testing time interval caused by pre-test operations at the well. By synthetic and field examples, we demonstrate that deviation of the matching curve from the data that is usually attributed to skin and wellbore storage effects, can also be interpreted through this new parameter. Moreover, with our method, the data curve is matched equally well and the results of the analysis remain stable when the analyzed data interval is perturbed, whereas traditional methods are sensitive to the choice of the data interval. A special efficient minimization procedure has been developed for searching the best fitting parameters. We enhanced our analysis above with a procedure of estimating ambient reservoir pressure and dimensionless wellbore radius. The methods reported here have been implemented in code ODA (Operations Data Analysis). A beta version of the code is available for free testing and evaluation to interested parties

  3. Fast Flux Test Facility sodium pump operating experience - mechanical

    International Nuclear Information System (INIS)

    Buonamici, R.

    1987-11-01

    The Heat Transport System (HTS) pumps were designed, fabricated, tested, and installed in the Fast Flux Test Facility (FFTF) Plant during the period from September 1970 through July 1977. Since completion of the installation and sodium fill in December 1978, the FFTF Plant pumps have undergone extensive testing and operation with HTS testing and reactor operation. Steady-state hydraulic and mechanical performances have been and are excellent. In all, FFTF primary and secondary pumps have operated in sodium for approximately 75,000 hours and 79,000 hours, respectively, to August 24, 1987

  4. Low-flow operation and testing of pumps in nuclear plants

    International Nuclear Information System (INIS)

    Greenstreet, W.L.

    1989-01-01

    Low-flow operation of centrifugal pumps introduces hydraulic instability and other factors that can cause damage to these machines. The resulting degradation has been studied and recorded for pumps in electric power plants. The objectives of this paper are to (1) describe the damage-producing phenomena, including their sources and consequences; (2) relate these observations to expectations for damage caused by low-flow operation of pumps in nuclear power plants; and (3) assess the utility of low-flow testing. Hydraulic behavior during low-flow operation is reviewed for a typical centrifugal pump stage, and the damage-producing mechanisms are described. Pump monitoring practices, in conjunction with pump performance characteristics, are considered; experience data are reviewed; and the effectiveness of low-flow surveillance monitoring is examined. Degradation caused by low-flow operation is shown to be an important factor, and low-flow surveillance testing is shown to be inadequate. 18 refs., 5 figs., 4 tabs

  5. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Energy Technology Data Exchange (ETDEWEB)

    Degraff, Brian D. [ORNL; Howell, Matthew P. [ORNL; Kim, Sang-Ho [ORNL; Neustadt, Thomas S. [ORNL

    2017-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  6. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Science.gov (United States)

    DeGraff, B.; Howell, M.; Kim, S.; Neustadt, T.

    2017-12-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  7. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  8. Pre-compression volume on flow ripple reduction of a piston pump

    Science.gov (United States)

    Xu, Bing; Song, Yuechao; Yang, Huayong

    2013-11-01

    Axial piston pump with pre-compression volume(PCV) has lower flow ripple in large scale of operating condition than the traditional one. However, there is lack of precise simulation model of the axial piston pump with PCV, so the parameters of PCV are difficult to be determined. A finite element simulation model for piston pump with PCV is built by considering the piston movement, the fluid characteristic(including fluid compressibility and viscosity) and the leakage flow rate. Then a test of the pump flow ripple called the secondary source method is implemented to validate the simulation model. Thirdly, by comparing results among the simulation results, test results and results from other publications at the same operating condition, the simulation model is validated and used in optimizing the axial piston pump with PCV. According to the pump flow ripples obtained by the simulation model with different PCV parameters, the flow ripple is the smallest when the PCV angle is 13°, the PCV volume is 1.3×10-4 m3 at such operating condition that the pump suction pressure is 2 MPa, the pump delivery pressure 15 MPa, the pump speed 1 000 r/min, the swash plate angle 13°. At the same time, the flow ripple can be reduced when the pump suction pressure is 2 MPa, the pump delivery pressure is 5 MPa,15 MPa, 22 MPa, pump speed is 400 r/min, 1 000 r/min, 1 500 r/min, the swash plate angle is 11°, 13°, 15° and 17°, respectively. The finite element simulation model proposed provides a method for optimizing the PCV structure and guiding for designing a quieter axial piston pump.

  9. Test report for the run-in acceptance testing of the hydrogen mitigation retrieval Pump-3

    International Nuclear Information System (INIS)

    Berglin, B.G.; Nash, Ch.R.

    1997-01-01

    This report will provide the findings of the demonstration test conducted on the Double-Shell Tank (DST) 241-SY-101 HMR Pump-3 in accordance with WHC-SDWM-TP-434 ''Test plan for run-in acceptance testing of hydrogen mitigation/retrieval pump-3'' at the 400 Area Maintenance and Storage Facility (MASF) building from 7 June 1996 through 30 July 1996 per work package 4A-96-92/W. The DST 241-SY-101 hydrogen mitigation retrieval Pump-3 is a 200-HP submersible electric driven pump that has been modified for use in the DST 241-SY-101 containing mixed waste located in the 200W area. The pump has a motor driven rotation mechanism that allows the pump column to rotate through 355 degree. Prior to operation, pre-operational checks were performed which included loop calibration grooming and alignment of instruments, learning how plumb HMR-3 assembly hung in a vertical position and bump test of the motor to determine rotation direction. The pump was tested in the MASF Large Diameter Cleaning Vessel (LDCV) with process water at controlled temperatures and levels. In addition, the water temperature of the cooling water to the motor oil heat exchanger was recorded during testing. A 480-volt source powered a Variable Frequency Drive (VFD). The VFD powered the pump at various frequencies and voltages to control speed and power output of the pump. A second VFD powered the oil cooling pump. A third VFD was not available to operate the rotational drive motor during the 72 hour test, so it was demonstrated as operational before and after the test. A Mini Acquisition and Control System (Mini-DACS) controls pump functions and monitoring of the pump parameters. The Mini-DACS consists of three computers, software and some Programmable Logic Controllers (PLC). Startup and shutdown of either the pump motor or the oil cooling pump can be accomplished by the Mini-DACS. When the pump was in operation, the Mini-DACS monitors automatically collects data electronically. However, some required data

  10. 40 CFR 90.408 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ....408 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... during service accumulation is allowed only in accordance with § 90.118. (b) Engine pre-test preparation... by § 90.324(a). If necessary, allow the heated sample line, filters, and pumps to reach operating...

  11. Experimental Study on Series Operation of Sliding Vane Pump and Centrifugal Pump

    OpenAIRE

    Li, Tao; Zhang, Weiming; Jiang, Ming; Li, Zhengyang

    2013-01-01

    A platform for sliding vane pump and centrifugal pump tests is installed to study the series operation of them under different characteristics of pipeline. Firstly, the sliding vane pump and the centrifugal pump work independently, and the performance is recorded. Then, the two types of pumps are combined together, with the sliding vane pump acting as the feeding pump. Comparison is made between the performance of the independently working pump and the performance of series operation pump. Re...

  12. Test results of pre-production prototype distributed ion pump design for the PEP-II Asymmetric B-Factory collider

    Energy Technology Data Exchange (ETDEWEB)

    Holdener, F.R.; Behne, D.; Hathaway, D. [and others

    1995-04-24

    We have built and tested a plate-type pre-production distributed Ion Pump (DIP) for the PEP-II B-Factory High Energy Ring (HER). The design has been an earlier design to use less materials and to costs. Penning cell hole sizes of 15, 18, and 21 mm have been tested in a uniform magnetic field of 0.18 T to optimize pumping speed. The resulting final DIP design consisting of a 7-plate, 15 mm basic cell size anode was magnetic field of the HER dipole. A description of the final optimized DIP design will be presented along with the test results of the pumping speed measurements.

  13. Reactor recirculation pump test loop

    International Nuclear Information System (INIS)

    Taka, Shusei; Kato, Hiroyuki

    1979-01-01

    A test loop for a reactor primary loop recirculation pumps (PLR pumps) has been constructed at Ebara's Haneda Plant in preparation for production of PLR pumps under license from Byron Jackson Pump Division of Borg-Warner Corporation. This loop can simulate operating conditions for test PLR pumps with 130 per cent of the capacity of pumps for a 1100 MWe BWR plant. A main loop, primary cooling system, water demineralizer, secondary cooling system, instrumentation and control equipment and an electric power supply system make up the test loop. This article describes the test loop itself and test results of two PLR pumps for Fukushima No. 2 N.P.S. Unit 1 and one main circulation pump for HAZ Demonstration Test Facility. (author)

  14. Choreographer Pre-Testing Code Analysis and Operational Testing.

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, David J. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Harrison, Christopher B. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Perr, C. W. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Hurd, Steven A [Sandia National Laboratories (SNL-CA), Livermore, CA (United States)

    2014-07-01

    Choreographer is a "moving target defense system", designed to protect against attacks aimed at IP addresses without corresponding domain name system (DNS) lookups. It coordinates actions between a DNS server and a Network Address Translation (NAT) device to regularly change which publicly available IP addresses' traffic will be routed to the protected device versus routed to a honeypot. More details about how Choreographer operates can be found in Section 2: Introducing Choreographer. Operational considerations for the successful deployment of Choreographer can be found in Section 3. The Testing & Evaluation (T&E) for Choreographer involved 3 phases: Pre-testing, Code Analysis, and Operational Testing. Pre-testing, described in Section 4, involved installing and configuring an instance of Choreographer and verifying it would operate as expected for a simple use case. Our findings were that it was simple and straightforward to prepare a system for a Choreographer installation as well as configure Choreographer to work in a representative environment. Code Analysis, described in Section 5, consisted of running a static code analyzer (HP Fortify) and conducting dynamic analysis tests using the Valgrind instrumentation framework. Choreographer performed well, such that only a few errors that might possibly be problematic in a given operating situation were identified. Operational Testing, described in Section 6, involved operating Choreographer in a representative environment created through EmulyticsTM . Depending upon the amount of server resources dedicated to Choreographer vis-á-vis the amount of client traffic handled, Choreographer had varying degrees of operational success. In an environment with a poorly resourced Choreographer server and as few as 50-100 clients, Choreographer failed to properly route traffic over half the time. Yet, with a well-resourced server, Choreographer handled over 1000 clients without missrouting. Choreographer

  15. Operability test procedure for 241-U compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The supply piping to the 241-U Tank Farm is not included in the modification. Modifications to the 241-U-701 compressed air system include installation of a 15 HP Reciprocating Air Compressor, Ingersoll-Rand Model 10T3NLM-E15; an air dryer, Hankinson, Model DH-45; and miscellaneous system equipment and piping (valves, filters, etc.) to meet the design. A newly installed heat pump allows the compressor to operate within an enclosed relatively dust free atmosphere and keeps the compressor room within a standard acceptable temperature range, which makes possible efficient compressor operation, reduces maintenance, and maximizes compressor operating life. This document is an Operability Test Procedure (OTP) which will further verify (in addition to the Acceptance Test Procedure) that the 241-U-701 compressed air system and heat pump operate within their intended design parameters. The activities defined in this OTP will be performed to ensure the performance of the new compressed air system will be adequate, reliable and efficient. Completion of this OTP and sign off of the OTP Acceptance of Test Results is necessary for turnover of the compressed air system from Engineering to Operations

  16. A Methodology for Evaluation of Inservice Test Intervals for Pumps and Motor-Operated Valves

    International Nuclear Information System (INIS)

    Cox, D.F.; Haynes, H.D.; McElhaney, K.L.; Otaduy, P.J.; Staunton, R.H.; Vesely, W.E.

    1999-01-01

    Recent nuclear industry reevaluation of component inservice testing (IST) requirements is resulting in requests for IST interval extensions and changes to traditional IST programs. To evaluate these requests, long-term component performance and the methods for mitigating degradation need to be understood. Determining the appropriate IST intervals, along with component testing, monitoring, trending, and maintenance effects, has become necessary. This study provides guidelines to support the evaluation of IST intervals for pumps and motor-operated valves (MOVs). It presents specific engineering information pertinent to the performance and monitoring/testing of pumps and MOVs, provides an analytical methodology for assessing the bounding effects of aging on component margin behavior, and identifies basic elements of an overall program to help ensure component operability. Guidance for assessing probabilistic methods and the risk importance and safety consequences of the performance of pumps and MOVs has not been specifically included within the scope of this report, but these elements may be included in licensee change requests

  17. Large-Scale Pumping Test Recommendations for the 200-ZP-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Spane, Frank A.

    2010-09-08

    CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

  18. Operating function tests of the PWR type RHR pump for engineering safety system under simulated strong ground excitation

    International Nuclear Information System (INIS)

    Uga, Takeo; Shiraki, Kazuhiro; Homma, Toshiaki; Inazuka, Hisashi; Nakajima, Norifumi.

    1979-08-01

    Results are described of operating function verification tests of a PWR RHR pump during an earthquake. Of the active reactor components, the PWR residual heat removal pump was chosen from view points of aseismic classification, safety function, structural complexity and past aseismic tests. Through survey of the service conditions and structure of this pump, seismic test conditions such as acceleration level, simulated seismic wave form and earthquake duration were decided for seismicity of the operating pump. Then, plans were prepared to evaluate vibration chracteristics of the pump and to estimate its aseismic design margins. Subsequently, test facility and instrumentation system were designed and constructed. Experimental results could thus be acquired on vibration characteristics of the pump and its dynamic behavior during different kinds and levels of simulated earthquake. In conclusion: (1) Stiffeners attached to the auxiliary system piping do improve aseismic performance of the pump. (2) The rotor-shaft-bearing system is secure unless it is subjected to transient disturbunces having high frequency content. (3) The motor and pump casing having resonance frequencies much higher than frequency content of the seismic wave show only small amplifications. (4) The RHR pump possesses an aseismic design margin more than 2.6 times the expected ultimate earthquake on design basis. (author)

  19. Estimation of pump operational state with model-based methods

    International Nuclear Information System (INIS)

    Ahonen, Tero; Tamminen, Jussi; Ahola, Jero; Viholainen, Juha; Aranto, Niina; Kestilae, Juha

    2010-01-01

    Pumps are widely used in industry, and they account for 20% of the industrial electricity consumption. Since the speed variation is often the most energy-efficient method to control the head and flow rate of a centrifugal pump, frequency converters are used with induction motor-driven pumps. Although a frequency converter can estimate the operational state of an induction motor without external measurements, the state of a centrifugal pump or other load machine is not typically considered. The pump is, however, usually controlled on the basis of the required flow rate or output pressure. As the pump operational state can be estimated with a general model having adjustable parameters, external flow rate or pressure measurements are not necessary to determine the pump flow rate or output pressure. Hence, external measurements could be replaced with an adjustable model for the pump that uses estimates of the motor operational state. Besides control purposes, modelling the pump operation can provide useful information for energy auditing and optimization purposes. In this paper, two model-based methods for pump operation estimation are presented. Factors affecting the accuracy of the estimation methods are analyzed. The applicability of the methods is verified by laboratory measurements and tests in two pilot installations. Test results indicate that the estimation methods can be applied to the analysis and control of pump operation. The accuracy of the methods is sufficient for auditing purposes, and the methods can inform the user if the pump is driven inefficiently.

  20. Operational test for photovoltaic pumping systems; Procedimento para averiguacao operacional de sistemas fotovoltaicos de bombeamento

    Energy Technology Data Exchange (ETDEWEB)

    Fedrizzi, Maria Cristina; Brito, Alaan Ubaiara; Zilles, Roberto [Universidade de Sao Paulo (USP), SP (Brazil). Inst. de Eletrotecnica e Energia. Lab. de Sistemas Fotovoltaicos], e-mail: fedrizzi@iee.usp.br, e-mail: alaan@iee.usp.br, e-mail: zilles@iee.usp.br

    2004-07-01

    This paper presents an operational test for photovoltaic pumping systems daily production, m{sup 3}/dia. The procedure does not involve expensive instrumentation and is easy to be applied in the field as acceptance and qualification tools. In this way, the paper presents the boundary conditions for operational test accomplishment that allows its application. (author)

  1. First in situ operation performance test of ground source heat pump in Tunisia

    International Nuclear Information System (INIS)

    Naili, Nabiha; Attar, Issam; Hazami, Majdi; Farhat, Abdelhamid

    2013-01-01

    Highlights: • Evaluate the geothermal energy in Tunisia. • Study of the performance of GSHP system for cooling space. • GSHP is a promising alternative for building cooling in Tunisia. - Abstract: The main purpose of this paper is to study the energetic potential of the deployment in Tunisia of the Ground Source Heat Pump (GSHP) system for cooling mode application. Therefore, a pilot GSHP system using horizontal Ground Heat Exchanger (GHE) was installed and experimented in the Research and Technology Center of Energy (CRTEn), Borj Cédria. The experiment is conducted in a test room with a floor area of about 12 m 2 . In the floor of the tested room is integrated a polyethylene exchanger (PEX) used as a radiant floor cooling (RFC) system. The experimental setup mainly includes the ground temperature, the temperature and flow rate of water circulating in the heat pump and the GHE, as well as the power consumption of the heat pump and circulating pumps. These experimental data are essentially used to evaluate the coefficient of performance of the heat pump (COP hp ) and the overall system (COP sys ) for continuous operation mode. The COP hp and the COP sys were found to be 4.25 and 2.88, respectively. These results reveal that the use of the ground source heat pump is very appropriate for Tunisian building cooling

  2. Acceptance test report: Field test of mixer pump for 241-AN-107 caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1997-01-01

    The field acceptance test of a 75 HP mixer pump (Hazleton serial number N-20801) installed in Tank 241-AN-107 was conducted from October 1995 thru February 1996. The objectives defined in the acceptance test were successfully met, with two exceptions recorded. The acceptance test encompassed field verification of mixer pump turntable rotation set-up and operation, verification that the pump instrumentation functions within established limits, facilitation of baseline data collection from the mixer pump mounted ultrasonic instrumentation, verification of mixer pump water flush system operation and validation of a procedure for its operation, and several brief test runs (bump) of the mixer pump

  3. Enhance pump reliability through improved inservice testing

    International Nuclear Information System (INIS)

    Healy, J.J.

    1990-01-01

    EPRI has undertaken a study to assess the effectiveness of existing testing programs to accurately monitor and predict performance changes before either pump performance degrades or an actual failure occurs. Anticipated changes in inservice testing techniques are directed towards enhancing the validity of test data, ensuring its repeatability, and avoiding deterioration of the pump assembly. There is a new-found interest in test programs of all types that has occurred, in part, because of an increase in reported pump degradation and pump failure. Inservice testing of pumps, which has long been a basis for assuring operability, has apparently produced an opposite effect; namely, the appearance of a reduction in reliability

  4. Parallel operation of primary sodium pumps in FBTR

    International Nuclear Information System (INIS)

    Athmalingam, S.; Ellappan, T.R.; Vaidyanathan, G.; Chetal, S.C.; Bhoje, S.B.

    1994-01-01

    Sodium pumps used in the primary main circuit of Fast Breeder Test Reactor (FBTR) are centrifugal pumps. These pumps have a free level of sodium with a cover gas above it to simplify the pump seal arrangement. The sodium level in the pumps will vary based on the flow. The minimum level is governed by consideration of gas entrainment and net positive suction head (NPSH) to the pump while the maximum level is limited by sodium entering the pump tank gas line. There is a special feature in these pumps in that a small portion of the pump outlet sodium flow is led back into the suction chamber to maintain level and avoid gas entrainment. A control valve in this line helps in controlling the level at the desired value. With parallel operation of two sodium pumps a study was conducted to find the regions of safe operation of the two pumps. The purpose of this paper is to give the various design features and methodology of the analysis to arrive at the limiting condition of operation for the different operating states of the two pumps and the effect of pump speed variations on the fluctuations in sodium flows. (author). 6 figs

  5. Alternative method of inservice hydraulic testing of difficult to test pumps

    International Nuclear Information System (INIS)

    Stockton, N.B.; Shangari, S.

    1994-01-01

    The pump test codes require that system resistance be varied until the independent variable (either the pump flow rate or differential pressure) equals its reference value. Variance from this fixed reference value is not specifically allowed. However, the design of many systems makes it impractical to set the independent variable to an exact value. Over a limited range of pump operation about the fixed reference value, linear interpolation between two points of pump operation can be used to accurately determine degradation at the reference value without repeating reference test conditions. This paper presents an overview of possible alternatives for hydraulic testing of pumps and a detailed discussion of the linear interpolation method. The approximation error associated with linear interpolation is analyzed. Methods to quantify and minimize approximation error are presented

  6. Development, testing, and certification of Calmac Mfg. Corp. solar collector and solar operated pump

    Science.gov (United States)

    Parker, J. C.

    1979-01-01

    Development of a rubber tube solar collector and solar operated pump for use with solar heating and cooling systems is discussed. The development hardware, problems encountered during fabrication and testing, and certification statements of performance are included.

  7. Inservice testing of vertical pumps

    International Nuclear Information System (INIS)

    Cornman, R.E. Jr.; Schumann, K.E.

    1994-01-01

    This paper focuses on the problems that may occur with vertical pumps while inservice tests are conducted in accordance with existing American Society of Mechanical Engineers Code, Section XI, standards. The vertical pump types discussed include single stage, multistage, free surface, and canned mixed flow pumps. Primary emphasis is placed on the hydraulic performance of the pump and the internal and external factors to the pump that impact hydraulic performance. In addition, the paper considers the mechanical design features that can affect the mechanical performance of vertical pumps. The conclusion shows how two recommended changes in the Code standards may increase the quality of the pump's operational readiness assessment during its service life

  8. Field Tests on Hydrodynamic and Hybrid Operation of a Bidirectional Thrust Bearing of a Pump-Turbine

    Directory of Open Access Journals (Sweden)

    Michał Wasilczuk

    2017-12-01

    Full Text Available In vertical shaft pump turbines operating in pumped storage power plants an important role is played by a thrust bearing. Due to the bidirectional character of operation, thrust bearing tilting pads have to be supported symmetrically, which is known to be unfavourable from the point of view of their performance. Large thrust bearings have to be carefully designed so as to minimise excessive thermo-elastic pad deformations. The research into fluid film thrust bearings has been quite extensive over the years, comprising theoretical studies of bearing properties with the use of more and more sophisticated calculation codes. On the other hand, the availability of experimental field data on bearing operation is limited, for obvious reasons. In this paper the authors present part of the results of extensive field tests of a large bearing of a pump-turbine they have conducted in a pumped storage power plant. Hopefully this data will be of interest to other researchers to compare theoretical predictions to measurement data.

  9. Tests of cooling water pumps at Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Travnicek, J.

    1986-01-01

    Tests were performed to examine the operating conditions of the 1600 BQDV cooling pumps of the main coolant circuit of unit 1 of the Dukovany nuclear power plant. For the pumps, the performance was tested in the permissible operating range, points were measured below this range and the guaranteed operating point was verified. Pump efficiency was calculated from the measured values. The discussion of the measurement of parameters has not yet been finished because the obtained values of the amount delivered and thus of the pump efficiency were not up to expectation in all detail. It was also found that for obtaining the guaranteed flow the pump impeller had to be opened to 5deg -5.5deg instead of the declared 3deg. Also tested were pump transients, including the start of the pump, its stop, the operation and failure of one of the two pumps. In these tests, pressures were also measured at the inlet and the outlet of the inner part of the TG 11 turbine condenser. It was shown that the time course and the pressure course of the processes were acceptable. In addition to these tests, pressure losses in the condenser and the cooling water flow through the feed pump electromotor cooler wre tested for the case of a failure of one of the two pumps. (E.S.)

  10. French nuclear plant safeguard pump qualification testing: EPEC test loop

    International Nuclear Information System (INIS)

    Guesnon, H.

    1985-01-01

    This paper reviews the specifications to which nuclear power plant safeguard pumps must be qualified, and surveys the qualification methods and program used in France to verify operability of the pump assembly and major pump components. The EPEC test loop is described along with loop capabilities and acheivements up to now. This paper shows, through an example, the Medium Pressure Safety Injection Pump designed for service in 1300 MW nuclear power plants, and the interesting possibilities offered by qualification testing

  11. Hydrodynamical tests with an original PWR heat removal pump

    International Nuclear Information System (INIS)

    Wietstock, P.

    1984-01-01

    GKSS-Forschungszentrum performes hydrodynamical tests with an original PWR heat removal pump to analyse the influences of fluid parameters on the capacity and cavitation behavior of the pump in order to get further improvements of the quantification of the reached safety-level. It can be concluded, that in case of the tested heat removal pump the additional loads during transition from cavitation free operation into fully cavitation for the investigated operation point with 980 m 3 /h will be smaller than the alteration of loads during passing through the total characteristic. The results from cavitation tests for other operation points indicate, that this very important consequence especially for accident operation will be valid for the total specified pump flow area. (orig.)

  12. The operating reliability of the reactor coolant pump

    International Nuclear Information System (INIS)

    Grancy, W.

    1996-01-01

    There is a strong tendency among operating companies and manufacturers of nuclear power stations to further increase safety and operating availability of the plant and of its components. This applies also and particularly to reactor coolant pumps for the primary circuit of nuclear power stations of the type PWR. For 3 decades, ANDRITZ has developed and built such pumps and has attached great importance to the design of the complete pump rotor and of its essential surrounding elements, such as bearing and shaft seal. Apart from questions connected with design functioning of the pump there is one question of top priority: the operating reliability of the reactor coolant pump. The pump rotor (together with the rotor of the drive motor) is the only component within the primary system that permanently rotates at high speed during operation of the reactor plant. Many questions concerning design and configuration of such components cannot be answered purely theoretically, or they can only be answered partly. Therefore comprehensive development work and testing was necessary to increase the operating reliability of the pump rotor itself and of its surrounding elements. This contribution describes the current status of development and, as a focal point, discusses shaft sealing solutions elaborated so far. In this connection also a sealing system will be presented which aims for the first time at using a two-stage mechanical seal in reactor coolant pumps

  13. K-Basin sludge treatment facility pump test report

    International Nuclear Information System (INIS)

    SQUIER, D.M.

    1999-01-01

    Tests of a disc pump and a dual diaphragm pump are stymied by pumping a metal laden fluid. Auxiliary systems added to a diaphragm pump might enable the transfer of such fluids, but the additional system complexity is not desirable for remotely operated and maintained systems

  14. Pump testing in the nuclear industry: The comprehensive test and other considerations

    International Nuclear Information System (INIS)

    Hoyle, T.F.

    1992-01-01

    The American Society of Mechanical Engineers Operations and Maintenance Working Group on Pumps and Valves is working on a revision to their pump testing Code, ISTB-1990. This revision will change the basic philosophy of pump testing in the nuclear industry. Currently, all pumps are required to be tested quarterly, except those installed in dry sumps. In the future standby pumps will receive only a start test quarterly to ensure the pump comes up to speed and pressure or flow. Then, on a biennial basis all pumps would receive a more extensive test. This comprehensive test would require high accuracy test gauges to be used, and the pumps would be required to be tested near pump design flow. Testing on minimum flow loops would not be permitted except in rare cases. Additionally. during the comprehensive test, measurements of vibration, flow, and pressure would all be taken. The OM-6 standard (ISTB Code) will also require that reference values of flow rate and differential pressure be taken at several points instead of just one point, which is current practice. The comprehensive test is just one step in ensuring the adequacy of pump testing in the nuclear industry. This paper also addresses other concerns and makes recommendations for increased quality of testing of certain critical pumps and recommendations for less stringent or no tests on less critical pumps

  15. The Performance test of Mechanical Sodium Pump with Water Environment

    International Nuclear Information System (INIS)

    Cho, Chungho; Kim, Jong-Man; Ko, Yung Joo; Jeong, Ji-Young; Kim, Jong-Bum; Ko, Bock Seong; Park, Sang Jun; Lee, Yoon Sang

    2015-01-01

    As contrasted with PWR(Pressurized light Water Reactor) using water as a coolant, sodium is used as a coolant in SFR because of its low melting temperature, high thermal conductivity, the high boiling temperature allowing the reactors to operate at ambient pressure, and low neutron absorption cross section which is required to achieve a high neutron flux. But, sodium is violently reactive with water or oxygen like the other alkali metal. So Very strict requirements are demanded to design and fabricate of sodium experimental facilities. Furthermore, performance testing in high temperature sodium environments is more expensive and time consuming and need an extra precautions because operating and maintaining of sodium experimental facilities are very difficult. The present paper describes performance test results of mechanical sodium pump with water which has been performed with some design changes using water test facility in SAM JIN Industrial Co. To compare the hydraulic characteristic of model pump with water and sodium, the performance test of model pump were performed using vender's experimental facility for mechanical sodium pump. To accommodate non-uniform thermal expansion and to secure the operability and the safety, the gap size of some parts of original model pump was modified. Performance tests of modified mechanical sodium pump with water were successfully performed. Water is therefore often selected as a surrogate test fluid because it is not only cheap, easily available and easy to handle but also its important hydraulic properties (density and kinematic viscosity) are very similar to that of the sodium. Normal practice to thoroughly test a design or component before applied or installed in reactor is important to ensure the safety and operability in the sodium-cooled fast reactor (SFR). So, in order to estimate the hydraulic behavior of the PHTS pump of DSFR (600 MWe Demonstraion SFR), the performance tests of the model pump such as performance

  16. Evaluation and testing of metering pumps for high-level nuclear waste slurries

    International Nuclear Information System (INIS)

    Peterson, M.E.; Perez, J.M. Jr.; Blair, H.T.

    1986-06-01

    The metering pump system that delivers high-level liquid wastes (HLLW) slurry to a melter is an integral subsystem of the vitrification process. The process of selecting a pump for this application began with a technical review of pumps typically used for slurry applications. The design and operating characteristics of numerous pumps were evaluated against established criteria. Two pumps, an air-displacement slurry (ADS) pump and an air-lift pump, were selected for further development. In the development activity, from FY 1983 to FY 1985, the two pumps were subjected to long-term tests using simulated melter feed slurries to evaluate the pumps' performances. Throughout this period, the designs of both pumps were modified to better adapt them for this application. Final reference designs were developed for both the air-displacement slurry pump and the air-lift pump. Successful operation of the final reference designs has demonstrated the feasibility of both pumps. A fully remote design of the ADS pump has been developed and is currently undergoing testing at the West Valley Demonstration Project. Five designs of the ADS pump were tested and evaluated. The initial four designs proved the operating concept of the ADS pump. Weaknesses in the ADS pump system were identified and eliminated in later designs. A full-scale air-lift pump was designed and tested as a final demonstration of the air-lift pump's capabilities

  17. Part-load pumping operation, control and behaviour

    International Nuclear Information System (INIS)

    1988-01-01

    Twenty one papers are printed. Their main concern is with pump performance under abnormal operating conditions or when operating at part-load. The effect of part-load operation on pump performance, pump internal flow and pump cavitation and noise were considered. The pumps considered are used in a variety of situations and some case studies were discussed. One paper about part-load operation of the boiler pumps for French pressurized water reactors and one paper on pressure pulsations of centrifugal pumps at very low flowrate, are indexed separately. (U.K.)

  18. On-line PWR RHR pump performance testing following motor and impeller replacement

    Energy Technology Data Exchange (ETDEWEB)

    DiMarzo, J.T.

    1996-12-01

    On-line maintenance and replacement of safety-related pumps requires the performance of an inservice test to determine and confirm the operational readiness of the pumps. In 1995, major maintenance was performed on two Pressurized Water Reactor (PWR) Residual Heat Removal (RHR) Pumps. A refurbished spare motor was overhauled with a new mechanical seal, new motor bearings and equipped with pump`s `B` impeller. The spare was installed into the `B` train. The motor had never been run in the system before. A pump performance test was developed to verify it`s operational readiness and determine the in-situ pump performance curve. Since the unit was operating, emphasis was placed on conducting a highly accurate pump performance test that would ensure that it satisfied the NSSS vendors accident analysis minimum acceptance curve. The design of the RHR System allowed testing of one train while the other was aligned for normal operation. A test flow path was established from the Refueling Water Storage Tank (RWST) through the pump (under test) and back to the RWST. This allowed staff to conduct a full flow range pump performance test. Each train was analyzed and an expression developed that included an error vector term for the TDH (ft), pressure (psig), and flow rate (gpm) using the variance error vector methodology. This method allowed the engineers to select a test instrumentation system that would yield accurate readings and minimal measurement errors, for data taken in the measurement of TDH (P,Q) versus Pump Flow Rate (Q). Test results for the `B` Train showed performance well in excess of the minimum required. The motor that was originally in the `B` train was similarly overhauled and equipped with `A` pump`s original impeller, re-installed in the `A` train, and tested. Analysis of the `A` train results indicate that the RHR pump`s performance was also well in excess of the vendors requirements.

  19. Fast Flux Test Facility replacement of a primary sodium pump

    International Nuclear Information System (INIS)

    Krieg, S.A.; Thomson, J.D.

    1985-01-01

    The Fast Flux Test Facility is a 400 MW Thermal Sodium Cooled Fast Reactor operated by Westinghouse Hanford Company for the US Department of Energy. During startup testing in 1979, the sodium level in one of the primary sodium pumps was inadvertently raised above the normal height. This resulted in distortion of the pump shaft. Pump replacement was carried out using special maintenance equipment. Nuclear radiation and contamination were not significant problems since replacement operations were carried out shortly after startup of the Fast Flux Test Facility

  20. Construction and testing of a double acting bellows liquid helium pump

    International Nuclear Information System (INIS)

    Burns, W.A.; Green, M.A.; Ross, R.R.; Van Slyke, H.

    1980-05-01

    The double acting reciprocating bellows liquid helium pump built and tested at the Lawrence Berkeley Laboratory is described. The pump is capable of delivering 50 gs -1 of liquid helium to supply the two-phase cooling sytem for a large superconducting magnet. The pump is driven by a torque motor at room temperature; the reciprocating motion is transmitted to the pump through a shaft which operates between room temperature and 4 0 K. The design details of this liquid helium pump are presented. The helium pump has operated in a helium bath and in pumped forced flow helium circuits. The results of these experimental tests are presented in this report

  1. First operation experiences with ITER-FEAT model pump

    International Nuclear Information System (INIS)

    Mack, A.; Day, Chr.; Haas, H.; Murdoch, D.K.; Boissin, J.C.; Schummer, P.

    2001-01-01

    Design and manufacturing of the model cryopump for ITER-FEAT have been finished. After acceptance tests at the contractor's premises the pump was installed in the TIMO-facility which was prepared for testing the pump under ITER-FEAT relevant operating conditions. The procedures for the final acceptance tests are described. Travelling time, positioning accuracy and leak rate of the main valve are within the requirements. The heat loads to the 5 and 80 K circuits are a factor two better than the designed values. The maximum pumping speeds for H 2 , D 2 , He, Ne were measured. The value of 58 m 3 /s for D 2 is well above the contractual required value of 40 m 3 /s

  2. Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps

    International Nuclear Information System (INIS)

    Berglin, B.G.

    1998-01-01

    This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ''Mixer Pump Test Specification for Project W-151'' and Statement of Work 8K520-EMN-95-004 ''Mixer Pump Performance Demonstration at MASF'' in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work

  3. On-line PWR RHR pump performance testing following motor and impeller replacement

    International Nuclear Information System (INIS)

    DiMarzo, J.T.

    1996-01-01

    On-line maintenance and replacement of safety-related pumps requires the performance of an inservice test to determine and confirm the operational readiness of the pumps. In 1995, major maintenance was performed on two Pressurized Water Reactor (PWR) Residual Heat Removal (RHR) Pumps. A refurbished spare motor was overhauled with a new mechanical seal, new motor bearings and equipped with pump's 'B' impeller. The spare was installed into the 'B' train. The motor had never been run in the system before. A pump performance test was developed to verify it's operational readiness and determine the in-situ pump performance curve. Since the unit was operating, emphasis was placed on conducting a highly accurate pump performance test that would ensure that it satisfied the NSSS vendors accident analysis minimum acceptance curve. The design of the RHR System allowed testing of one train while the other was aligned for normal operation. A test flow path was established from the Refueling Water Storage Tank (RWST) through the pump (under test) and back to the RWST. This allowed staff to conduct a full flow range pump performance test. Each train was analyzed and an expression developed that included an error vector term for the TDH (ft), pressure (psig), and flow rate (gpm) using the variance error vector methodology. This method allowed the engineers to select a test instrumentation system that would yield accurate readings and minimal measurement errors, for data taken in the measurement of TDH (P,Q) versus Pump Flow Rate (Q). Test results for the 'B' Train showed performance well in excess of the minimum required. The motor that was originally in the 'B' train was similarly overhauled and equipped with 'A' pump's original impeller, re-installed in the 'A' train, and tested. Analysis of the 'A' train results indicate that the RHR pump's performance was also well in excess of the vendors requirements

  4. Operational Test Report (OTR) for U-105 Pumping and Instrumentation and Control (PIC) Skid

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-18). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-105. The completed OTP and OTR are referenced in the IS PIC Skid Configuration Drawing (H-2-829998)

  5. Operational Test Report (OTR) for U-105 Pumping and Instrumentation and Control (PIC) Skid

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    2000-02-28

    Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-18). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-105. The completed OTP and OTR are referenced in the IS PIC Skid Configuration Drawing (H-2-829998).

  6. Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    2000-02-28

    Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-16). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-103. The completed OTP and OTR are referenced in the 25 PIC Skid Configuration Drawing (H-2-829998).

  7. Operational Test Report (OTR) for U-102 Pumping and Instrumentation and Control (PIC) Skid

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    2000-02-28

    Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-19 and Rev. A-20). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-102. The completed OTP and OTR are referenced in the IS PIC Skid Configuration Drawing (H-2-829998).

  8. Damages on pumps and systems the handbook for the operation of centrifugal pumps

    CERN Document Server

    Merkle, Thomas

    2014-01-01

    Damage on Pumps and Systems. The Handbook for the Operation of Centrifugal Pumps offers a combination of the theoretical basics and practical experience for the operation of circulation pumps in the engineering industry. Centrifugal pumps and systems are extremely vulnerable to damage from a variety of causes, but the resulting breakdown can be prevented by ensuring that these pumps and systems are operated properly. This book provides a total overview of operating centrifugal pumps, including condition monitoring, preventive maintenance, life cycle costs, energy savings and economic aspects. Extra emphasis is given to the potential damage to these pumps and systems, and what can be done to prevent breakdown. Addresses specific issues about pumping of metal chips, sand, abrasive dust and other solids in fluidsEmphasis on economic and efficiency aspects of predictive maintenance and condition monitoring Uses life cycle costs (LCC) to evaluate and calculate the costs of pumping systems

  9. Anesthesiologists' and surgeons' perceptions about routine pre-operative testing in low-risk patients: application of the Theoretical Domains Framework (TDF) to identify factors that influence physicians' decisions to order pre-operative tests.

    Science.gov (United States)

    Patey, Andrea M; Islam, Rafat; Francis, Jill J; Bryson, Gregory L; Grimshaw, Jeremy M

    2012-06-09

    Routine pre-operative tests for anesthesia management are often ordered by both anesthesiologists and surgeons for healthy patients undergoing low-risk surgery. The Theoretical Domains Framework (TDF) was developed to investigate determinants of behaviour and identify potential behaviour change interventions. In this study, the TDF is used to explore anaesthesiologists' and surgeons' perceptions of ordering routine tests for healthy patients undergoing low-risk surgery. Sixteen clinicians (eleven anesthesiologists and five surgeons) throughout Ontario were recruited. An interview guide based on the TDF was developed to identify beliefs about pre-operative testing practices. Content analysis of physicians' statements into the relevant theoretical domains was performed. Specific beliefs were identified by grouping similar utterances of the interview participants. Relevant domains were identified by noting the frequencies of the beliefs reported, presence of conflicting beliefs, and perceived influence on the performance of the behaviour under investigation. Seven of the twelve domains were identified as likely relevant to changing clinicians' behaviour about pre-operative test ordering for anesthesia management. Key beliefs were identified within these domains including: conflicting comments about who was responsible for the test-ordering (Social/professional role and identity); inability to cancel tests ordered by fellow physicians (Beliefs about capabilities and social influences); and the problem with tests being completed before the anesthesiologists see the patient (Beliefs about capabilities and Environmental context and resources). Often, tests were ordered by an anesthesiologist based on who may be the attending anesthesiologist on the day of surgery while surgeons ordered tests they thought anesthesiologists may need (Social influences). There were also conflicting comments about the potential consequences associated with reducing testing, from negative

  10. MK-III function tests in JOYO. Primary main cooling pump

    International Nuclear Information System (INIS)

    Isozaki, Kazunori; Saito, Takakazu; Sumino, Kouzo; Karube, Kouji; Terano, Toshihiro; Sakaba, Hideo; Nakai, Satoru

    2004-06-01

    MK-III function test (SKS-1) that was carried out from October 17, 2001 through October 23, 2001 using MK-III transition core configuration and MK-III function tests (SKS-2) was carried out from January 27, 2003 through February 13, 2003 using MK-III core configuration. The major function tests results of primary cooling system were shown as follows; (1) The stability of the primary main pump flow control system was confirmed on both CAS (cascade) mode and Man (manual) mode. Also no divergence of flow and revolution of the pump were observed at step flow change disturbance. (2) The main motor was shifted to run-back flow control operation in about 54 seconds after scram. The flow rate and pump revolution at run-back operation of A and B cooling system were 167 m 3 /h and 117 rpm, 185m 3 /h and 118 rpm respectively. The pump revolution was within the design target revolution 122 rpm ± 8 rpm and the flow was over the 10% of the rated flow. (3) The pony motor was engaged in operation in about 39 seconds after the primary main pump trip. The flow rate and pump revolution at the pony motor operation of A and B cooling system were 180 m 3 /h and 124 rpm, 190 m 3 /h and 123 rpm respectively. These values were satisfied the design low limit of 93 rpm and 10% of the rated flow. (4) Free flow coast down time constant was longer than 10 seconds that was design shortest time at both the primary pump trip and run-back operation. (5) Pump over flow column sodium levels of both A and B cooling system at rated operating condition were NL-1550 mm and, NL-1468 mm respectively and were lower than NL-1581 mm of the design value. This result shows the new IHX pressure loss estimation was conservative. (6) It was confirmed that the primary main pump could operate with out scram for up to 0.6 seconds of external power supply loss. (author)

  11. A Methodology for Evaluation of Inservice Test Intervals for Pumps and Motor Operated Valves

    International Nuclear Information System (INIS)

    McElhaney, K.L.

    1999-01-01

    The nuclear industry has begun efforts to reevaluate inservice tests (ISTs) for key components such as pumps and valves. At issue are two important questions--What kinds of tests provide the most meaningful information about component health, and what periodic test intervals are appropriate? In the past, requirements for component testing were prescribed by the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The tests and test intervals specified in the Code were generic in nature and test intervals were relatively short. Operating experience has shown, however, that performance and safety improvements and cost savings could be realized by tailoring IST programs to similar components with comparable safety importance and service conditions. In many cases, test intervals may be lengthened, resulting in cost savings for utilities and their customers

  12. Operating experience with a high capacity helium pump under supercritical conditions

    International Nuclear Information System (INIS)

    Lehmann, W.; Minges, J.

    1984-01-01

    This chapter discusses the development and testing of a high-capacity piston pump to provide forced cooling for large superconducting magnets. The pump is a three cylinder, vertically arranged single-acting piston pump equipped with a frequency controlled three-phase geared motor operating at room temperature. The pump is capable of delivering up to 150 g/s at a maximum speed of 310 rpm and under the inlet conditions of 4 bar/4.5 K. No decline was noticed in delivery head and efficiencies during more than 560 hours of operation. It is concluded that the pump satisfies all requirements for circulating large mass flows across great pressure differences as needed (e.g. in fusion magnet design)

  13. Operating pumps on minimum flow

    International Nuclear Information System (INIS)

    Casada, D.A.; Li, Y.C.

    1992-01-01

    The Nuclear Regulatory Commission (NRC) staff issued Information Notice (IN) 87-59 to alert all licensees to two miniflow design concerns identified by Westinghouse. The first potential problem discussed in this IN involves parallel pump operation. If the head/capacity curve of one of the parallel pumps is greater than the other, the weaker pump may be dead-headed when the pumps are operating at low-flow conditions. The other problem related to potential pump damage as a result of hydraulic instability during low-flow operation. In NRC Bulletin 88-04, dated May 5, 1988, the staff requested all licensees to investigate and correct, as applicable, the two miniflow design concerns. The staff also developed a Temporary Instruction, Tl 2515/105, dated January 29, 1990 to inspect for the adequacy of licensee response and follow-up actions to NRC Bulletin 88-04. Oak Ridge National Laboratory has reviewed utility responses to Bulletin 88-04 under auspices of the NRC's Nuclear Plant Aging Research Program, and participated in several NRC inspections. Examples of actions that have been taken, an assessment of the overall industry response, and resultant conclusions and recommendations are presented

  14. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  15. Performance Tests of a Mechanical Pump in Sodium Environment

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Chungho; Kim, Jong-Man; Ko, Yung Joo; Kim, Byeongyeon; Cho, Youngil; Jung, Min-Hwan; Gam, Da-Young; Lee, Yong Bum; Jeong, Ji-Young; Kim, Jong-Bum [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Water is often selected as a surrogate test fluid because it is not only cheap, easily available and easy to handle but also its important hydraulic properties (density and kinematic viscosity) are very similar to that of the sodium. Nevertheless, to ensure the performance, safety, and operability of major components before its installation in the SFR, a series of demonstration experiments of some components in sodium environment should be positively necessary. So, SFR NSSS System Design Division of Korea Atomic Energy Research Institute (KAERI) built various sodium experimental facilities, especially STELLA-1 in 2012. STELLA-1 (Sodium inTegral Effect test Loop for safety simuLation and Assessment) is a large-scale separated effect test facility for demonstrating the thermal-hydraulic performances of major components such as a Sodium-to-Sodium heat exchanger (DHX), Sodium-to-Air heat exchanger (AHX) of the decay heat removal system, and mechanical sodium pump of the primary heat transport system (PHTS). The mechanical pump in-sodium performance test was successfully performed with good reproducibility of the experiment and data to compare hydraulic characteristic of a mechanical pump in-water was collected. In effect of temperature variation on the pump pressure head, reduction of pump pressure head at 250℃ by 0.57% of that of 300℃ maybe the result of an increase in sodium viscosity by 13.6% according to operating temperature decrease by 50℃. Also, we confirmed that the more flywheel weight, the longer halving time and the more initial flow rate when the pump seized, the shorter halving time. The results of the mechanical pump performance test data in sodium environment will be used to compare with that of the in water environment after the evaluation of measurement uncertainty for tests.

  16. LHI (low head safety injection) emergency cooling pump test for the EPR trademark in operation with solid matter loaded water

    International Nuclear Information System (INIS)

    Ganzmann, I.; Schulte, C.

    2010-01-01

    Emergency cooling pumps are essential and indispensable components of the NPP safety philosophy. In case of a loss-of coolant accident solid matter (debris: fibrous insulation material, concrete dust, pigment particles) might be released into the coolant, LHSI (low head safety injection) pumps have to ensure their performance capacity for a certain amount of debris without damage or loss of power. The authors describe the development of a test facility. The LHSI was tested in continuous operation over a time period of 14 days with a debris content of 1500 ppm (90% mineral wool fibers, 3% concrete dust, 3% pigment particles, 4% microporous insulation material). The pump did not show any damage or loss of hydraulic power. Further tests including thermoshock conditions (temperature changes of 160 C) are planned.

  17. Anesthesiologists’ and surgeons’ perceptions about routine pre-operative testing in low-risk patients: application of the Theoretical Domains Framework (TDF to identify factors that influence physicians’ decisions to order pre-operative tests

    Directory of Open Access Journals (Sweden)

    Patey Andrea M

    2012-06-01

    Full Text Available Abstract Background Routine pre-operative tests for anesthesia management are often ordered by both anesthesiologists and surgeons for healthy patients undergoing low-risk surgery. The Theoretical Domains Framework (TDF was developed to investigate determinants of behaviour and identify potential behaviour change interventions. In this study, the TDF is used to explore anaesthesiologists’ and surgeons’ perceptions of ordering routine tests for healthy patients undergoing low-risk surgery. Methods Sixteen clinicians (eleven anesthesiologists and five surgeons throughout Ontario were recruited. An interview guide based on the TDF was developed to identify beliefs about pre-operative testing practices. Content analysis of physicians’ statements into the relevant theoretical domains was performed. Specific beliefs were identified by grouping similar utterances of the interview participants. Relevant domains were identified by noting the frequencies of the beliefs reported, presence of conflicting beliefs, and perceived influence on the performance of the behaviour under investigation. Results Seven of the twelve domains were identified as likely relevant to changing clinicians’ behaviour about pre-operative test ordering for anesthesia management. Key beliefs were identified within these domains including: conflicting comments about who was responsible for the test-ordering (Social/professional role and identity; inability to cancel tests ordered by fellow physicians (Beliefs about capabilities and social influences; and the problem with tests being completed before the anesthesiologists see the patient (Beliefs about capabilities and Environmental context and resources. Often, tests were ordered by an anesthesiologist based on who may be the attending anesthesiologist on the day of surgery while surgeons ordered tests they thought anesthesiologists may need (Social influences. There were also conflicting comments about the potential

  18. Mitigation of tank 241-SY-101 by pump mixing: Results of full-scale testing

    International Nuclear Information System (INIS)

    Stewart, C.W.; Hudson, J.D.; Friley, J.R.; Panisko, F.E.; Antoniak, Z.I.; Irwin, J.J.; Fadeff, J.G.; Efferding, L.F.; Michener, T.E.; Kirch, N.W.

    1994-06-01

    The Full-Scale Mixer Pump Test Program was performed in Hanford Tank 241-SY-101 from February 4 to April 13, 1994, to confirm the long-term operational strategy for flammable gas mitigation and to demonstrate that mixing can control the gas release and waste level. Since its installation on July 3, 1993, the current pump, operating only a few hours per week, has proved capable of mixing the waste sufficiently to release gas continuously instead of in large episodic events. The results of Full-Scale Testing demonstrated that the pump can control gas release and waste level for long-term mitigation, and the four test sequences formed the basis for the long-term operating schedule. The last test sequence, jet penetration tests, showed that the current pump jet creates flow near the tank wall and that it can excavate portions of the bottom sludge layer if run at maximum power. Pump mixing has altered the open-quote normal close-quote configuration of the waste; most of the original nonconvective sludge has been mixed with the supernatant liquid into a mobile convective slurry that has since been maintained by gentle pump operation and does not readily return to sludge

  19. Prediction of chronic post-operative pain: pre-operative DNIC testing identifies patients at risk.

    Science.gov (United States)

    Yarnitsky, David; Crispel, Yonathan; Eisenberg, Elon; Granovsky, Yelena; Ben-Nun, Alon; Sprecher, Elliot; Best, Lael-Anson; Granot, Michal

    2008-08-15

    Surgical and medical procedures, mainly those associated with nerve injuries, may lead to chronic persistent pain. Currently, one cannot predict which patients undergoing such procedures are 'at risk' to develop chronic pain. We hypothesized that the endogenous analgesia system is key to determining the pattern of handling noxious events, and therefore testing diffuse noxious inhibitory control (DNIC) will predict susceptibility to develop chronic post-thoracotomy pain (CPTP). Pre-operative psychophysical tests, including DNIC assessment (pain reduction during exposure to another noxious stimulus at remote body area), were conducted in 62 patients, who were followed 29.0+/-16.9 weeks after thoracotomy. Logistic regression revealed that pre-operatively assessed DNIC efficiency and acute post-operative pain intensity were two independent predictors for CPTP. Efficient DNIC predicted lower risk of CPTP, with OR 0.52 (0.33-0.77 95% CI, p=0.0024), i.e., a 10-point numerical pain scale (NPS) reduction halves the chance to develop chronic pain. Higher acute pain intensity indicated OR of 1.80 (1.28-2.77, p=0.0024) predicting nearly a double chance to develop chronic pain for each 10-point increase. The other psychophysical measures, pain thresholds and supra-threshold pain magnitudes, did not predict CPTP. For prediction of acute post-operative pain intensity, DNIC efficiency was not found significant. Effectiveness of the endogenous analgesia system obtained at a pain-free state, therefore, seems to reflect the individual's ability to tackle noxious events, identifying patients 'at risk' to develop post-intervention chronic pain. Applying this diagnostic approach before procedures that might generate pain may allow individually tailored pain prevention and management, which may substantially reduce suffering.

  20. Qualification test of a main coolant pump for SMART pilot

    International Nuclear Information System (INIS)

    Park, Sang Jin; Yoon, Eui Soo; Oh, Hyong Woo

    2006-01-01

    SMART Pilot is a multipurpose small capacity integral type reactor. Main Coolant Pump (MCP) of SMART Pilot is a canned-motor-type axial pump to circulate the primary coolant between nuclear fuel and steam generator in the primary system. The reactor is designed to operate under condition of 310 .deg. C and 14.7 MPa. Thus MCP has to be tested under same operating condition as reactor design condition to verify its performance and safety. In present work, a test apparatus to simulate real operating situations of the reactor has been designed and constructed to test MCP. And then functional tests, performance tests, and endurance tests have been carried out upon a prototype MCP. Canned motor characteristics, homologous head/torque curves, coast-down curves, NPSH curves and life-time performance variations were obtained from the qualification test as well as hydraulic performance characteristics of MCP

  1. Operating states of PFBR-primary sodium pump

    International Nuclear Information System (INIS)

    Sreedharan, K.V.; Rao, A.S.L.K.; Raju, C.; Kale, R.D.

    1994-01-01

    The proposed 500 MWe Prototype Fast Breeder Reactor (PFBR), the design of which is in progress at the Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam will be equipped with four centrifugal sodium pumps each in its primary and secondary circuits. This paper discusses the various operating states of the primary pumps viz. (i) normal steady state (ii) transient state operation. The paper also discusses the safe limits on the pump operating speed and a few design basis incidents. (author). 1 ref., 2 figs., 3 tabs

  2. Description of comprehensive pump test change to ASME OM code, subsection ISTB

    International Nuclear Information System (INIS)

    Hartley, R.S.

    1994-01-01

    The American Society of Mechanical Engineers (ASME) Operations and Maintenance (OM) Main Committee and Board on Nuclear Codes and Standards (BNCS) recently approved changes to ASME OM Code-1990, Subsection ISTB, Inservice Testing of Pumps in Light-Water Reactor Power Plants. The changes will be included in the 1994 addenda to ISTB. The changes, designated as the comprehensive pump test, incorporate a new, improved philosophy for testing safety-related pumps in nuclear power plants. An important philosophical difference between the open-quotes old codeclose quotes inservice testing (IST) requirements and these changes is that the changes concentrate on less frequent, more meaningful testing while minimizing damaging and uninformative low-flow testing. The comprehensive pump test change establishes a more involved biannual test for all pumps and significantly reduces the rigor of the quarterly test for standby pumps. The increased rigor and cost of the biannual comprehensive tests are offset by the reduced cost of testing and potential damage to the standby pumps, which comprise a large portion of the safety-related pumps at most plants. This paper provides background on the pump testing requirements, discusses potential industry benefits of the change, describes the development of the comprehensive pump test, and gives examples and reasons for many of the specific changes. This paper also describes additional changes to ISTB that will be included in the 1994 addenda that are associated with, but not part of, the comprehensive pump test

  3. Multiphase pumping: indoor performance test and oilfield application

    Science.gov (United States)

    Kong, Xiangling; Zhu, Hongwu; Zhang, Shousen; Li, Jifeng

    2010-03-01

    Multiphase pumping is essentially a means of adding energy to the unprocessed effluent which enables the liquid and gas mixture to be transported over a long distances without prior separation. A reduction, consolidation, or elimination of the production infrastructure, such as separation equipments and offshore platforms can be developed more economically. Also it successfully lowed the backpressure of wells, revived dead wells and improved the production and efficiency of oilfield. This paper reviews the issues related to indoor performance test and an oilfield application of the helico-axial multiphase pump designed by China University of Petroleum (Beijing). Pump specification and its hydraulic design are given. Results of performance testing under different condition, such as operational speed and gas volume fraction (GVF) etc are presented. Experimental studies on combination of theoretical analysis showed the multiphase pump satisfies the similitude rule, which can be used in the development of new MPP design and performance prediction. Test results showed that rising the rotation speed and suction pressure could better its performance, pressure boost improved, high efficiency zone expanding and the flow rate related to the optimum working condition increased. The pump worked unstable as GVF increased to a certain extent and slip occurred between two phases in the pump, creating surging and gas lock at a high GVF. A case of application in Nanyang oilfield is also studied.

  4. IEEE guide for planning of pre-operational testing programs for class 1E power systems for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Institute of Electrical and Electronics Engineers (IEEE) guide for pre-operational testing of Class 1E power systems for nuclear-power generating stations is presented. The guidelines apply to power systems both ac and dc supplies but not to the equipment which utilizes the ac and dc power. The pre-operational tests are performed after appropriate construction tests

  5. Solar systems and heat pumps in operation in Carinthia: results 1994 - 1997

    International Nuclear Information System (INIS)

    Faninger, G.

    1998-04-01

    Solar systems and heat pumps in operation in Carinthia: results 1994 - 1997. Test results from solar systems for swimming pool heating, hot water preparation and space heating as well as heat pumps for hot water preparation, space heating and heat recovery will be reported and assessed collectively. (author)

  6. Test of a cryogenic helium pump

    International Nuclear Information System (INIS)

    Lue, J.W.; Miller, J.R.; Walstrom, P.L.; Herz, W.

    1981-01-01

    The design of a cryogenic helium pump for circulating liquid helium in a magnet and the design of a test loop for measuring the pump performance in terms of mass flow vs pump head at various pump speeds are described. A commercial cryogenic helium pump was tested successfully. Despite flaws in the demountable connections, the piston pump itself has performed satisfactorily. A helium pump of this type is suitable for the use of flowing supercritical helium through Internally Cooled Superconductor (ICS) magnets. It has pumped supercritical helium up to 7.5 atm with a pump head up to 2.8 atm. The maximum mass flow rate obtained was about 16 g/s. Performance of the pump was degraded at lower pumping speeds

  7. Detection and effects of pump low-flow operation

    International Nuclear Information System (INIS)

    Casada, D.A.; Greene, R.H.

    1993-01-01

    Operating experience and previous studies have shown that a significant cause of pump problems and failures can result from low- flow operation. Operation at low-flow rates can create unstable flows within the pump impeller and casing. This condition can result in an increased radial and axial thrust on the rotor, which in turn causes higher shaft stresses, increased shaft deflection, and potential bearing and mechanical seal problems. Two of the more serious results of low-flow pump operation are cavitation and recirculation. Cavitation is the formation and subsequent collapse of vapor bubbles in any flow that is at an ambient pressure less than the vapor pressure of the liquid medium. It is the collapse of these vapor bubbles against the metal surfaces of the impeller or casing that causes surface pitting, erosion, and deterioration. Pump recirculation more damaging than cavitation. If located at the impeller eye, recirculation damages the inlet areas of the casing. At the impeller tips, recirculation alters the outside diameter of the impeller. If recirculation occurs around impeller shrouds, it damages thrust bearings. Recirculation also erodes impellers, diffusers, and volutes and causes failure of mechanical seals and bearings. This paper reports on a utility pump failure caused by low-flow induced phenomena. ORNL is investigating the results of low-flow pump operations by evaluating the types of measurements and diagnostic techniques that are currently used by licensees to detect pump degradation. A new, enhanced application of motor current and power data analysis has been developed that uses a signal comparison methodology to produce an instability ratio indicative of normal or unstable flow conditions. Examples of this type of low-flow detection technique are presented in this paper along with a brief discussion of the various types of technologies currently being used by licensees to evaluate pump operation and determine possible degradation

  8. Pre-operational proof and leakage rate testing requirements for concrete containment structures for CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1994-02-01

    This Standard provides the requirements for pre-operational proof tests and leakage rate tests of concrete containment structures of a containment system designed as Class Containment components. 1 fig

  9. Design and operation of gas-heated thermal pumping units

    Energy Technology Data Exchange (ETDEWEB)

    Rostek, H A [Ruhrgas A.G., Essen (Germany, F.R.)

    1979-03-01

    The first gas heat pump systems have been operated since spring 1977. These are applied in living houses, school, swimming pools, and sport places and administration buildings. The heating performance of these systems is 150-3800 kW. Two of these systems, one in a swimming pool and one in a house for several families are operating, each of them for one heating period. The operational experiences with these gas heat pumps are reported on, basing on measurement results. The experience gathered from the operation of gas heat pumps systems is applied to the planning of other plants. The development of a standardized gas heat pump-series is emphasized.

  10. Operating experience with an on-line vibration control system for PWR main coolant pumps

    International Nuclear Information System (INIS)

    Runkel, J.; Stegemann, D.; Vortriede, A.

    1996-01-01

    The main circulation pumps are key components of nuclear power plants with pressurized water reactors, because the availability of the main circulation pumps has a direct influence on the availability and electrical output of the entire plant. The on-line automatic vibration control system ASMAS was developed for early failure detection during the normal operation of the main circulation pumps in order to avoid unexpected outages and to establish the possibility of preventive maintenance of the pumps. This system is permanently and successfully operating in three German 1300 MW el NPP's with PWR and has been successfully tested in a 350 MW el NPP with a PWR. (orig.)

  11. Operating experience with an on-line vibration control system for PWR main coolant pumps

    International Nuclear Information System (INIS)

    Runkel, J.; Stegemann, D.; Vortriede, A.

    1998-01-01

    The main circulation pumps are key components of nuclear power plants with pressurized water reactors (PWRs), because the availability of the main circulation pumps has a direct influence on the availability and electrical output of the entire plant. The on-line automatic vibration control system ASMAS was developed for early failure detection during the normal operation of the main circulation pumps in order to avoid unexpected outages and to establish the possibility of preventive maintenance of the pumps. This system is permanently and successfully operating in three German 1300 MW e1 NPP's with PWR and has been successfully tested in a 350 MW e1 NPP with a PWR. (orig.)

  12. Advanced development and operating experience with a canned motor pump under pressurized water reactor conditions

    International Nuclear Information System (INIS)

    Dittmer, H.; Reymann, A.; Seibig, B.; Reinecker, H.

    1988-01-01

    At the research reactor FRG-2, Geesthacht, an irradiation device is in operation for testing defective light-water-reactor (LWR) test fuel rods under pressurized water reactor conditions (320 0 C, 160 bar). The requirements to the canned motor pump for cooling water circulation: medium: Demineralized water, operating temperature 320 0 C, operating pressure 155 bar, radiation field of the reactor, integration in the irradiation capsule, helium leak rate -6 mbar.dm 3 .s -1 , minimum working life 3000 hours, were high and caused difficulties in the acquisition of this component. First test runs with supplied pumps showed that the desired working life could not be achieved. The results of the development steps, the test runs, and the performance in service show that for our range of applications, the best combination of materials for the radial bearings is silicon-infiltrated SiC (8% free Si) against the same material. These bearings allowed a good working life for the pump to be achieved. (orig./GL) [de

  13. Reactor primary pumps dynamic balancing test

    International Nuclear Information System (INIS)

    Lu Qunxian

    2002-01-01

    Reactor primary Pump is the important equipment in the primary circuit, its working quality would directly influence the safety and operation of nuclear power plant. The author describes that the primary pump vibration status, vibration fault diagnosis and dynamic balancing process on site have been performed since commercial operation of DA YA BAY Nuclear Power plant

  14. Pre-test analysis of protected loss of primary pump transients in CIRCE-HERO facility

    Science.gov (United States)

    Narcisi, V.; Giannetti, F.; Del Nevo, A.; Tarantino, M.; Caruso, G.

    2017-11-01

    In the frame of LEADER project (Lead-cooled European Advanced Demonstration Reactor), a new configuration of the steam generator for ALFRED (Advanced Lead Fast Reactor European Demonstrator) was proposed. The new concept is a super-heated steam generator, double wall bayonet tube type with leakage monitoring [1]. In order to support the new steam generator concept, in the framework of Horizon 2020 SESAME project (thermal hydraulics Simulations and Experiments for the Safety Assessment of MEtal cooled reactors), the ENEA CIRCE pool facility will be refurbished to host the HERO (Heavy liquid mEtal pRessurized water cOoled tubes) test section to investigate a bundle of seven full scale bayonet tubes in ALFRED-like thermal hydraulics conditions. The aim of this work is to verify thermo-fluid dynamic performance of HERO during the transition from nominal to natural circulation condition. The simulations have been performed with RELAP5-3D© by using the validated geometrical model of the previous CIRCE-ICE test section [2], in which the preceding heat exchanger has been replaced by the new bayonet bundle model. Several calculations have been carried out to identify thermal hydraulics performance in different steady state conditions. The previous calculations represent the starting points of transient tests aimed at investigating the operation in natural circulation. The transient tests consist of the protected loss of primary pump, obtained by reducing feed-water mass flow to simulate the activation of DHR (Decay Heat Removal) system, and of the loss of DHR function in hot conditions, where feed-water mass flow rate is absent. According to simulations, in nominal conditions, HERO bayonet bundle offers excellent thermal hydraulic behavior and, moreover, it allows the operation in natural circulation.

  15. W-087 Operational test report. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks. The equipment to be tested includes the following: a. Leak detection system operation and controls. b. Electrical interlocks.- C. Transfer pump oper ation. d. Vacuum breaker system interlocks.

  16. Cognitive Dysfunction after On-Pump Operations: Neuropsychological Characteristics and Optimal Core Battery of Tests

    Directory of Open Access Journals (Sweden)

    Anna G. Polunina

    2014-01-01

    Full Text Available Postoperative cognitive dysfunction (POCD is a mild form of perioperative ischemic brain injury, which emerges as memory decline, decreased attention, and decreased concentration during several months, or even years, after surgery. Here we present results of our three neuropsychological studies, which overall included 145 patients after on-pump operations. We found that the auditory memory span test (digit span was more effective as a tool for registration of POCD, in comparison with the word-list learning and story-learning tests. Nonverbal memory or visuoconstruction tests were sensitive to POCD in patients after intraoperative opening of cardiac chambers with increased cerebral air embolism. Psychomotor speed tests (digit symbol, or TMT A registered POCD, which was characteristic for elderly atherosclerotic patients. Finally, we observed that there were significant effects of the order of position of a test on the performance on this test. For example, the postoperative performance on the core tests (digit span and digit symbol showed minimal impairment when either of these tests was administered at the beginning of testing. Overall, our data shows that the selection of tests, and the order of which these tests are administered, may considerably influence the results of studies of POCD.

  17. Automated analysis of pumping tests; Analise automatizada de testes de bombeamento

    Energy Technology Data Exchange (ETDEWEB)

    Sugahara, Luiz Alberto Nozaki

    1996-01-01

    An automated procedure for analysis of pumping test data performed in groundwater wells is described. A computer software was developed to be used under the Windows operational system. The software allows the choice of 3 mathematical models for representing the aquifer behavior, which are: Confined aquifer (Theis model); Leaky aquifer (Hantush model); unconfined aquifer (Boulton model). The analysis of pumping test data using the proper aquifer model, allows for the determination of the model parameters such as transmissivity, storage coefficient, leakage coefficient and delay index. The computer program can be used for the analysis of data obtained from both pumping tests, with one or more pumping rates, and recovery tests. In the multiple rate case, a de superposition procedure has been implemented in order to obtain the equivalent aquifer response for the first flow rate, which is used in obtaining an initial estimate of the model parameters. Such initial estimate is required in the non-linear regression analysis method. The solutions to the partial differential equations describing the aquifer behavior were obtained in Laplace space, followed by numerical inversion of the transformed solution using the Stehfest algorithm. The data analysis procedure is based on a non-linear regression method by matching the field data to the theoretical response of a selected aquifer model, for a given type of test. A least squared regression analysis method was implemented using either Gauss-Newton or Levenberg-Marquardt procedures for minimization of a objective function. The computer software can also be applied to multiple rate test data in order to determine the non-linear well coefficient, allowing for the computation of the well inflow performance curve. (author)

  18. Fabrication and testing of main sodium pumps of Superphenix 1

    International Nuclear Information System (INIS)

    Noel, H.; Pasqualini, G.

    1985-01-01

    The complexity of the loads involved and the extremely fine analysis required necessitates extensive design calculations for the Superphenix 1 primary and secondary pumps and associated expansion tanks, aiming toward detailed design validation, after slight adjustments, mainly to the secondary pumps and expansion tanks. The component parts to be built were far larger than those for the previous pumps (Rapsodie, Phenix), with very low manufacturing tolerances, which led to precision machining and welding operations, together with numerous dimensional inspections and materials characterization tests to achieve the required quality standards

  19. Vivitron dead section pumping tests

    International Nuclear Information System (INIS)

    Heugel, J.; Bayet, J.P.; Brandt, C.; Delhomme, C.; Krieg, C.; Kustner, F.; Meiss, R.; Riehl, R.; Roth, C.; Schlewer, B.; Six, P.; Weber, A.

    1990-10-01

    Pumping tests have been conducted on a simulated accelerator dead section. The behavior of different pump types are compared and analyzed. Vacuum conditions to be expected in the Vivitron are reached and several parameters are verified. Selection of a pump for the Vivitron dead section is confirmed

  20. Experimental investigation of debris effects on pump operation and comparison with existing wear models

    International Nuclear Information System (INIS)

    Lewis, D.

    2010-01-01

    During a Loss of Coolant Accident (LOCA) the emergency core cooling system (ECCS), comprised of several pumping systems, must provide cooling water to the reactor core. Initially, during an LOCA pumps are operated with clean water delivered from the storage tanks. After a certain time the water is recycled from the containment sump through the ECCS. This recycled water contains debris, both particulate and fibrous, that has collected in the containment sumps and passed through the strainers. The debris passing through the pumps will affect the pump performance. Previous tests, considering the effect of pumping debris, produced a model for predicting the wear in the pumps. This article and the objective of recent testing provide additional data which will improve prediction methods for performance degradation as a result of pumping foreign material. Experiments were performed on a small two stage pump with back to back impellers and a central bushing to obtain data and facilitate qualification of other pumps for these injections services. Various material combinations for pump internals, particle sizes and particle concentrations from 100 to 10000 ppm were examined. A total of six tests with more than 360 hours of run time were performed. At various points during each test, the pump was opened and dimensional measurements were taken. Pump hydraulic performance was measured during each segment of the various tests. Samples of the fluid were also taken at various times during the testing. The pump successfully ran without seizing during all modes of operation for all runs. Other incidents did occur including multiple failures involving wear through piping during the 10000 ppm run at which time the test was stopped before reaching the planned total run time. Pump seizure after shut down occurred after one of the tests. Hydraulic performance results showed a slight degradation in the developed head for all cases but one. That one case having a fine grain debris

  1. Detection and effects of pump low-flow operation

    International Nuclear Information System (INIS)

    Casada, D.A.; Greene, R.H.

    1994-01-01

    Operating experience and previous studies performed for the Nuclear Plant Aging Research Program have shown that a significant cause of pump problems and failures can result from low-flow operation. Operation at low-flow rates can create unstable flows within the pump impeller and casing. This condition can result in an increased radial and axial thrust on the rotor, which in turn causes higher shaft stresses, increased shaft deflection, and potential bearing and mechanical seal problems. Two of the more serious results of low-flow pump operation are cavitation and recirculation. Both of these conditions can be characterized by crackling sounds that accompany a substantial increase in vibration and noise level, and a reduction in total head and output capacity. Cavitation is the formation and subsequent collapse of vapor bubbles in any flow that is at an ambient pressure less than the vapor pressure of the liquid medium. It is the collapse of these vapor bubbles against the metal surfaces of the impeller or casing that causes surface pitting, erosion, and deterioration. Pump recirculation, reversal of a portion of the flow back through the impeller, can be potentially more damaging than cavitation. If located at the impeller eye, recirculation damages the inlet areas of the casing. At the impeller tips, recirculation alters the outside diameter of the impeller. If recirculation occurs around impeller shrouds, it damages thrust bearings. Recirculation also erodes impellers, diffusers, and volutes and causes failure of mechanical seals and bearings. This paper reports on a utility pump failure cause by low-flow induced phenomena. ORNL has continued to investigate the results of low-flow pump operations by evaluating the types of measurements and diagnostic techniques that are currently used by licensees to detect pump degradation

  2. High capacity getter pump for UHV operation

    International Nuclear Information System (INIS)

    Manini, P.; Marino, M.; Belloni, F.; Porro, M.

    1993-01-01

    UHV pumps based on non-evaporable getter coated strips find widespread use in particle accelerators, synchrotron radiation machines and nuclear fusion experimental devices. Depending on the geometric constraints, pressure operation conditions and the foreseen gas loads, optimized getter structures, such as modules and cartridges, can be designed and assembled into a high-efficiency pump. In the present paper, the design and performance of a newly conceived High Capacity Getter Pump (HCGP) based on sintered getter bodies, in the shape of blades instead of strips, is illustrated. The porosity and the specific surface area of the blades and their arrangement in the cartridge have been optimized to significantly increase sorption capacity at a given speed. These pumps are well suited for those applications where a very high gas load is expected during the machine operation. The sintered getter bodies increase surface area and capacity, requiring less frequent reactivation and facilitating greater overall life of the pump. A discussion of the experimental results in terms of sorption speed and capacity for various gases is presented

  3. Impact Of Secondary-Primary Pumps Operating Sequence On The Electrical Power Supply System

    International Nuclear Information System (INIS)

    Suwoto; Rusdiyanto; Kiswanto

    2001-01-01

    The operating procedure of the reactor cooling system has decided that the primary cooling pump should be operated before secondary cooling pump as known primary-secondary pumps operating sequence. This decision is based on consideration that starting current of the primary pump is higher than secondary pump. Therefore, the primary-secondary pumps operating sequence can avoid the power supply system failure. However, this operating procedure has to take a consequence that in case of primary pump failure, the shutdown time period of the reaktor to be longer caused to re operate the primary pump has required that the running secondary pump should be shutted off. To solve this problem, an impact analysis of the secondary-primary pumps operating sequence on the electric power supply system was carried out to identify the revision possibility of the cooling pump operating procedure. The analysis by discussion of the measuring results of the secondary and primary pump starting current related to another electrical loads has been measured. From discussion it can be concluded that secondary-primary pumps operating sequence has no impact to failure in electric power supply system

  4. AZ-101 Mixer Pump Demonstration and Tests Data Management Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    DOUGLAS, D.G.

    2000-02-22

    This document provides a plan for the analysis of the data collected during the AZ-101 Mixer Pump Demonstration and Tests. This document was prepared after a review of the AZ-101 Mixer Pump Test Plan (Revision 4) [1] and other materials. The plan emphasizes a structured and well-ordered approach towards handling and examining the data. This plan presumes that the data will be collected and organized into a unified body of data, well annotated and bearing the date and time of each record. The analysis of this data will follow a methodical series of steps that are focused on well-defined objectives. Section 2 of this plan describes how the data analysis will proceed from the real-time monitoring of some of the key sensor data to the final analysis of the three-dimensional distribution of suspended solids. This section also identifies the various sensors or sensor systems and associates them with the various functions they serve during the test program. Section 3 provides an overview of the objectives of the AZ-101 test program and describes the data that will be analyzed to support that test. The objectives are: (1) to demonstrate that the mixer pumps can be operated within the operating requirements; (2) to demonstrate that the mixer pumps can mobilize the sludge in sufficient quantities to provide feed to the private contractor facility, and (3) to determine if the in-tank instrumentation is sufficient to monitor sludge mobilization and mixer pump operation. Section 3 also describes the interim analysis that organizes the data during the test, so the analysis can be more readily accomplished. Section 4 describes the spatial orientation of the various sensors in the tank. This section is useful in visualizing the relationship of the Sensors in terms of their location in the tank and how the data from these sensors may be related to the data from other sensors. Section 5 provides a summary of the various analyses that will be performed on the data during the test

  5. AZ-101 Mixer Pump Demonstration and Tests: Data Management (Analysis) Plan

    International Nuclear Information System (INIS)

    DOUGLAS, D.G.

    2000-01-01

    This document provides a plan for the analysis of the data collected during the AZ-101 Mixer Pump Demonstration and Tests. This document was prepared after a review of the AZ-101 Mixer Pump Test Plan (Revision 4) [1] and other materials. The plan emphasizes a structured and well-ordered approach towards handling and examining the data. This plan presumes that the data will be collected and organized into a unified body of data, well annotated and bearing the date and time of each record. The analysis of this data will follow a methodical series of steps that are focused on well-defined objectives. Section 2 of this plan describes how the data analysis will proceed from the real-time monitoring of some of the key sensor data to the final analysis of the three-dimensional distribution of suspended solids. This section also identifies the various sensors or sensor systems and associates them with the various functions they serve during the test program. Section 3 provides an overview of the objectives of the AZ-101 test program and describes the data that will be analyzed to support that test. The objectives are: (1) to demonstrate that the mixer pumps can be operated within the operating requirements; (2) to demonstrate that the mixer pumps can mobilize the sludge in sufficient quantities to provide feed to the private contractor facility, and (3) to determine if the in-tank instrumentation is sufficient to monitor sludge mobilization and mixer pump operation. Section 3 also describes the interim analysis that organizes the data during the test, so the analysis can be more readily accomplished. Section 4 describes the spatial orientation of the various sensors in the tank. This section is useful in visualizing the relationship of the Sensors in terms of their location in the tank and how the data from these sensors may be related to the data from other sensors. Section 5 provides a summary of the various analyses that will be performed on the data during the test

  6. Quality assurance of pre-operative assessment--a review of quality assurance activities related to pre-operative assessment in nine hospitals in The Netherlands

    NARCIS (Netherlands)

    Klazinga, N. S.; Helsloot, R.

    1989-01-01

    Pre-operative assessment of patients for surgery is one of the most prevalent topics for quality assurance by peer-review in Dutch hospitals. This article describes the experiences with pre-operative assessment in nine hospitals. It is discussed why preoperative assessment is performed, what tests

  7. Induction Motors Most Efficient Operation Points in Pumped Storage Systems

    DEFF Research Database (Denmark)

    Busca-Forcos, Andreea; Marinescu, Corneliu; Busca, Cristian

    2015-01-01

    A clear focus is nowadays on developing and improving the energy storage technologies. Pumped storage is a well-established one, and is capable of enhancing the integration of renewable energy sources. Pumped storage has an efficiency between 70-80%, and each of its elements affects it. Increased...... efficiency is desired especially when operating with renewable energy systems, which present low energy conversion factor (up to 50% - performance coefficient for wind turbines, and efficiency up to 40% for photovoltaic systems). In this paper the most efficient operation points of the induction motors...... in pumped storage systems are established. The variable speed operation of the pumped storage systems and motor loading conditions for pump applications have been the key factors for achieving the purpose of the paper....

  8. Vapor-Compression Heat Pumps for Operation Aboard Spacecraft

    Science.gov (United States)

    Ruemmele, Warren; Ungar, Eugene; Cornwell, John

    2006-01-01

    Vapor-compression heat pumps (including both refrigerators and heat pumps) of a proposed type would be capable of operating in microgravity and would be safe to use in enclosed environments like those of spacecraft. The designs of these pumps would incorporate modifications of, and additions to, vapor-compression cycles of heat pumps now used in normal Earth gravitation, in order to ensure efficiency and reliability during all phases of operation, including startup, shutdown, nominal continuous operation, and peak operation. Features of such a design might include any or all of the following: (1) Configuring the compressor, condenser, evaporator, valves, capillary tubes (if any), and controls to function in microgravitation; (2) Selection of a working fluid that satisfies thermodynamic requirements and is safe to use in a closed crew compartment; (3) Incorporation of a solenoid valve and/or a check valve to prevent influx of liquid to the compressor upon startup (such influx could damage the compressor); (4) Use of a diode heat pipe between the cold volume and the evaporator to limit the influx of liquid to the compressor upon startup; and (5) Use of a heated block to vaporize any liquid that arrives at the compressor inlet.

  9. Detection of pump degradation

    International Nuclear Information System (INIS)

    Greene, R.H.; Casada, D.A.; Ayers, C.W.

    1995-08-01

    This Phase II Nuclear Plant Aging Research study examines the methods of detecting pump degradation that are currently employed in domestic and overseas nuclear facilities. This report evaluates the criteria mandated by required pump testing at U.S. nuclear power plants and compares them to those features characteristic of state-of-the-art diagnostic programs and practices currently implemented by other major industries. Since the working condition of the pump driver is crucial to pump operability, a brief review of new applications of motor diagnostics is provided that highlights recent developments in this technology. The routine collection and analysis of spectral data is superior to all other technologies in its ability to accurately detect numerous types and causes of pump degradation. Existing ASME Code testing criteria do not require the evaluation of pump vibration spectra but instead overall vibration amplitude. The mechanical information discernible from vibration amplitude analysis is limited, and several cases of pump failure were not detected in their early stages by vibration monitoring. Since spectral analysis can provide a wealth of pertinent information concerning the mechanical condition of rotating machinery, its incorporation into ASME testing criteria could merit a relaxation in the monthly-to-quarterly testing schedules that seek to verify and assure pump operability. Pump drivers are not included in the current battery of testing. Operational problems thought to be caused by pump degradation were found to be the result of motor degradation. Recent advances in nonintrusive monitoring techniques have made motor diagnostics a viable technology for assessing motor operability. Motor current/power analysis can detect rotor bar degradation and ascertain ranges of hydraulically unstable operation for a particular pump and motor set. The concept of using motor current or power fluctuations as an indicator of pump hydraulic load stability is presented

  10. Detection of pump degradation

    Energy Technology Data Exchange (ETDEWEB)

    Greene, R.H.; Casada, D.A.; Ayers, C.W. [and others

    1995-08-01

    This Phase II Nuclear Plant Aging Research study examines the methods of detecting pump degradation that are currently employed in domestic and overseas nuclear facilities. This report evaluates the criteria mandated by required pump testing at U.S. nuclear power plants and compares them to those features characteristic of state-of-the-art diagnostic programs and practices currently implemented by other major industries. Since the working condition of the pump driver is crucial to pump operability, a brief review of new applications of motor diagnostics is provided that highlights recent developments in this technology. The routine collection and analysis of spectral data is superior to all other technologies in its ability to accurately detect numerous types and causes of pump degradation. Existing ASME Code testing criteria do not require the evaluation of pump vibration spectra but instead overall vibration amplitude. The mechanical information discernible from vibration amplitude analysis is limited, and several cases of pump failure were not detected in their early stages by vibration monitoring. Since spectral analysis can provide a wealth of pertinent information concerning the mechanical condition of rotating machinery, its incorporation into ASME testing criteria could merit a relaxation in the monthly-to-quarterly testing schedules that seek to verify and assure pump operability. Pump drivers are not included in the current battery of testing. Operational problems thought to be caused by pump degradation were found to be the result of motor degradation. Recent advances in nonintrusive monitoring techniques have made motor diagnostics a viable technology for assessing motor operability. Motor current/power analysis can detect rotor bar degradation and ascertain ranges of hydraulically unstable operation for a particular pump and motor set. The concept of using motor current or power fluctuations as an indicator of pump hydraulic load stability is presented.

  11. Verification Test of Hydraulic Performance for Reactor Coolant Pump

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sang Jun; Kim, Jae Shin; Ryu, In Wan; Ko, Bok Seong; Song, Keun Myung [Samjin Ind. Co., Seoul (Korea, Republic of)

    2010-01-15

    According to this project, basic design for prototype pump and model pump of reactor coolant pump and test facilities has been completed. Basic design for prototype pump to establish structure, dimension and hydraulic performance has been completed and through primary flow analysis by computational fluid dynamics(CFD), flow characteristics and hydraulic performance have been established. This pump was designed with mixed flow pump having the following design requirements; specific velocity(Ns); 1080.9(rpm{center_dot}m{sup 3}/m{center_dot}m), capacity; 3115m{sup 3}/h, total head ; 26.3m, pump speed; 1710rpm, pump efficiency; 77.0%, Impeller out-diameter; 349mm, motor output; 360kw, design pressure; 17MPaG. The features of the pump are leakage free due to no mechanical seal on the pump shaft which insures reactor's safety and law noise level and low vibration due to no cooling fan on the motor which makes eco-friendly product. Model pump size was reduced to 44% of prototype pump for the verification test for hydraulic performance of reactor coolant pump and was designed with mixed flow pump and canned motor having the following design requirements; specific speed(NS); 1060.9(rpm{center_dot}m{sup 3}/m{center_dot}m), capacity; 539.4m{sup 3}/h, total head; 21.0m, pump speed; 3476rpm, pump efficiency; 72.9%, Impeller out-diameter; 154mm, motor output; 55kw, design pressure; 1.0MPaG. The test facilities were designed for verification test of hydraulic performance suitable for pump performance test, homologous test, NPSH test(cavitation), cost down test and pressure pulsation test of inlet and outlet ports. Test tank was designed with testing capacity enabling up to 2000m{sup 3}/h and design pressure 1.0MPaG. Auxiliary pump was designed with centrifugal pump having capacity; 1100m{sup 3}/h, total head; 42.0m, motor output; 190kw

  12. 40 CFR 89.406 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  13. Comparison of rechargeable versus battery-operated insulin pumps: temperature fluctuations.

    Science.gov (United States)

    Vereshchetin, Paul; McCann, Thomas W; Ojha, Navdeep; Venugopalan, Ramakrishna; Levy, Brian L

    2016-01-01

    The role of continuous subcutaneous insulin infusion (insulin pumps) has become increasingly important in diabetes management, and many different types of these systems are currently available. This exploratory study focused on the reported heating issues that lithium-ion battery-powered pumps may have during charging compared with battery-operated pumps. It was found that pump temperature increased by 6.4°C during a long charging cycle of a lithiumion battery-operated pump under ambient temperatures. In an environmental-chamber kept at 35°C, the pump temperature increased by 4.4°C, which indicates that the pump temperature was above that of the recommended safety limit for insulin storage of 37°C. When designing new pumps, and when using currently available rechargeable pumps in warmer climates, the implications of these temperature increases should be taken into consideration. Future studies should also further examine insulin quality after charging.

  14. Full sized tests on a french coolant pump under two-phase flow

    International Nuclear Information System (INIS)

    Huchard, J.C.; Bore, C.; Dueymes, E.

    1997-01-01

    The French Safety Authorities required EDF to demonstrate the ability of the new N4 main coolant pump to withstand two-phase flow conditions without damage. Therefore three full sized tests, simulating a bleeding flow on the primary system, were performed on a laboratory test loop under real operating conditions (temperature = 290 deg. C, pressure = 155 b, flowrate = 7 m 3 /s; electrical power = 7 MW). The maximum value of the mean void fraction reached 75 %. The outcome of the tests is very positive: the mechanical behaviour of the main coolant pump is good, even at high void fraction. The maximum vibration levels were below the limits fixed by the manufacturer. Correlations between the mechanical behaviour of the pump and the pressure pulsation in the test loop have been found. (authors)

  15. Proceedings of the 4th NRC/ASME symposium on valve and pump testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The 1996 Symposium on Valve and Pump Testing, jointly sponsored by the Board on Nuclear Codes and Standards of the American Society of Mechanical Engineers and by the U.S. Nuclear Regulatory Commission, provides a forum for the discussion of current programs and methods for inservice testing and motor-operated valve testing at nuclear power plants. The symposium also provides an opportunity to discuss the need to improve that testing in order to help ensure the reliable performance of pumps and valves. The participation of industry representatives, regulators, and consultants results in the discussion of a broad spectrum of ideas and perspectives regarding the improvement of inservice testing of pumps and valves at nuclear power plants. Individual papers of this Proceedings have been cataloged separately.

  16. Proceedings of the 4th NRC/ASME symposium on valve and pump testing

    International Nuclear Information System (INIS)

    1996-01-01

    The 1996 Symposium on Valve and Pump Testing, jointly sponsored by the Board on Nuclear Codes and Standards of the American Society of Mechanical Engineers and by the U.S. Nuclear Regulatory Commission, provides a forum for the discussion of current programs and methods for inservice testing and motor-operated valve testing at nuclear power plants. The symposium also provides an opportunity to discuss the need to improve that testing in order to help ensure the reliable performance of pumps and valves. The participation of industry representatives, regulators, and consultants results in the discussion of a broad spectrum of ideas and perspectives regarding the improvement of inservice testing of pumps and valves at nuclear power plants. Individual papers of this Proceedings have been cataloged separately

  17. Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications

  18. Long-term safety issues associated with mixer pump operation

    International Nuclear Information System (INIS)

    Kubic, W.L. Jr.

    1994-01-01

    In this report, we examine several long-term issues: the effect of pump operation on future gas release events (GREs), uncontrolled chemical reactions, chronic toxic gas releases, foaming, and erosion and corrosion. Heat load in excess of the design limit, uncontrolled chemical reactions, chronic toxic gas releases, foaming, and erosion and corrosion have been shown not to be safety concerns. The effect of pump operation on future GREs could not be quantified. The problem with evaluating the long-term effects of pump operation on GREs is a lack of knowledge and uncertainty. In particular, the phenomena governing gas retention, particle size distribution, and settling are not well understood, nor are the interactions among these factors understood. There is a possibility that changes in these factors could increase the size of future GREs. Bounding estimates of the potential increase in size of GREs are not possible because of a lack of engineering data. Proper management of the hazards can reduce, but not eliminate, the possibility of undesirable changes. Maintaining temperature within the historical limits can reduce the possibility of undesirable changes. A monitoring program to detect changes in the gas composition and crust thickness will help detect slowly occurring changes. Because pump operation has be shown to eliminate GREs, continued pump operation can eliminate the hazards associated with future GREs

  19. Experiment of a centrifugal pump during changing speed operation

    International Nuclear Information System (INIS)

    Yuan, H J; Wu, Y L; Liu, S H; Shao, J

    2012-01-01

    In this paper, a method of changing rotational speed of impeller periodically as the pulsatile working condition is developed to realize pulse outputs both of flow discharge and of head for a centrifugal pump through experiment. The performance of the centrifugal pump under pulsatile working operation condition is measured which indicates this model pump could produce desired pulse flow under such condition. Flow patterns at four testing points under pulsatile conditions are obtained by means of the particle image velocimetry (PIV) technology both with laser induced fluorescence (LIF) particles and refractive index matched (RIM) fluid. Results of PIV measurement show the distributions of velocity, streamlines, and the principal Reynolds normal stress (PRNS). Under the design flow rate condition, the relative velocity in the blade channel distributes smoothly and decreases from inlet to exit. And at the impeller exit, the relative velocity is lower close to suction side than that near pressure side of blade in most of blade channels.

  20. Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josh A. Salmond

    2009-08-07

    The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

  1. 200 Area Treated Effluent Disposal Facility operational test specification. Revision 2

    International Nuclear Information System (INIS)

    Crane, A.F.

    1995-01-01

    This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met. The technical requirements for operational testing of the 200 Area TEDF are defined by the test requirements presented in Appendix A. These test requirements demonstrate the following: pump station No.1 and associated support equipment operate both automatically and manually; pump station No. 2 and associated support equipment operate both automatically and manually; water is transported through the collection and transfer lines to the disposal ponds with no detectable leakage; the disposal ponds accept flow from the transfer lines with all support equipment operating as designed; and the control systems operate and status the 200 Area TEDF including monitoring of appropriate generator discharge parameters

  2. Heat pumps: planning, optimisation, operation and maintenance; Waermepumpen. Planung - Optimierung - Betrieb - Wartung

    Energy Technology Data Exchange (ETDEWEB)

    Kunz, P. [Kunz-Beratungen, Dietlikon (Switzerland); Afjei, T. [Fachhochschule Nordwestschweiz, Institut fuer Energie am Bau, Muttenz (Switzerland); Betschart, W.; Prochaska, V. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland); Hubacher, P. [Hubacher Engineering, Engelburg (Switzerland); Loehrer, R. [Scheco AG, Winterthur (Switzerland); Mueller, A. [Mueller und Pletscher AG, Winterthur (Switzerland)

    2008-01-15

    This handbook issued by the Swiss Federal Office of Energy (SFOE) in co-operation with a trade publication takes a look at the planning, optimisation, operation and maintenance of heat pumps. First of all, the basics of heat pump technology, heat pump components and refrigerants are discussed. Then, heat sources and heat distribution are looked at, followed by chapters on the integration of heat pumps into heating systems and noise protection topics. The definition of projects, commissioning and operation of heat pump systems are then discussed. Examples of installations round off the handbook.

  3. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  4. Structure and operation of bacterial tripartite pumps.

    Science.gov (United States)

    Hinchliffe, Philip; Symmons, Martyn F; Hughes, Colin; Koronakis, Vassilis

    2013-01-01

    In bacteria such as Pseudomonas aeruginosa and Escherichia coli, tripartite membrane machineries, or pumps, determine the efflux of small noxious molecules, such as detergents, heavy metals, and antibiotics, and the export of large proteins including toxins. They are therefore influential in bacterial survival, particularly during infections caused by multidrug-resistant pathogens. In these tripartite pumps an inner membrane transporter, typically an ATPase or proton antiporter, binds and translocates export or efflux substrates. In cooperation with a periplasmic adaptor protein it recruits and opens a TolC family cell exit duct, which is anchored in the outer membrane and projects across the periplasmic space between inner and outer membranes. Assembled tripartite pumps thus span the entire bacterial cell envelope. We review the atomic structures of each of the three pump components and discuss how these have allowed high-resolution views of tripartite pump assembly, operation, and possible inhibition.

  5. The analysis of the differences between the results of the thermal response test and the data from the operation of the brine-to-water heat pump's vertical exchanger

    Science.gov (United States)

    Fidorów-Kaprawy, Natalia; Stefanowicz, Ewelina; Mazurek, Wojciech; Szulgowska-Zgrzywa, Małgorzata; Bryszewska-Mazurek, Anna

    2017-11-01

    The article discusses the principles and the problems of obtaining an accurate data input for the design of brine-to-water heat pump's vertical exchangers. Currently, the most accurate method is the thermal response test (TRT). Unfortunately, the test procedure has its limitations and the quality of the results depends on many factors that cannot be fully controlled during the test. As an illustration of the problems, the results of the TRT were presented. The test was executed on the vertical boreholes (one actively regenerated and one not actively regenerated during the summer) which are parts of the operating heat pump system. The test results were compared to the data from the device's operation, in particular with the measurements of the undisturbed ground temperature profiles and the actual unit energy gains from the boreholes. The level of difference between the results of the test and the data from the operation of the boreholes under the real load and the threats concerning the boreholes overload were shown. Additionally the performance differences between the actively regenerated and not actively regenerated boreholes have been emphasised.

  6. Seismic tests in sodium of the SPX-1 primary pump shaft carried out in the CPV-1 test rig at ENEA-Brasimone

    International Nuclear Information System (INIS)

    Contardi, T.; Rapezzi, L.; Le Coz, P.; Tigeot, Y.; Partiti, C.; Zola, M.; Denimal, P.

    1988-01-01

    Dynamic tests were carried out by ISMES, on behalf of ENEA and CEA and in co-operation with FIAT/TTG, on a SPX-1 primary pump shaft. These tests were conducted, mainly in sodium, in the CPV-1 test rig at the ENEA Brasimone Center. The excitation was applied to the flange supporting the hydrostatic bearing. After some preliminary analysis performed in absence of liquid sodium and at ambient temperature, the following tests were performed on the rig filled with sodium at operating temperature: (A) sine sweeps between 1 and 15 Hz, (B) ambient vibration investigation, and (C) seismic tests with a SSE acceleration time-history (20 s duration) calculated by CEA at hydrostatic bearing level. Two sets of seismic tests were carried out, each time increasing amplitudes up to 70% of SSE. This value was not exceeded for safety reasons and actuator power limit. The first set of tests began in nominal operating conditions; when 70% of SSE was reached, pressure feed to hydrostatic bearing was reduced lowering its effective support. This simulated a larger earthquake. The second set of tests was representative of SPX-1 pump actual operating conditions, because both hydrostatic bearing pressure and shaft rotating speed were simultaneously reduced following the primary pump characteristic curve. The tests allowed the SPX-1 pump rotating set to be widely qualified. Among the main results, it is worth noting that the stiffness of the hydrostatic bearing system was generally compatible with seismic requirements. Finally, it is worth pointing out that, in order to allow the above-mentioned tests to be carried out, a full seismic qualification of the CPV-1 test rig was necessary: thus, this rig might be used in the future for further seismic tests on LMFBR components and systems in sodium. (author). Figs and tabs

  7. Pump testing - Comparison of factory vs. field test of centrifugal pumps

    International Nuclear Information System (INIS)

    Fehlau, R.

    1992-01-01

    Testing of pumps in situ, i.e., as installed in a system, will typically yield somewhat different performance results from the original manufacturer's factory test. This paper discusses some of the reasons for these variations. It shows that the factory test curves can be used for evaluation of initial acceptance tests but not for reference in normal inservice testing (IST). This is the basis for reference values used in American Society of Mechanical Engineers (ASME) Section 11 specifications and the revised ASME Code 1990

  8. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  9. High power operation of cladding pumped holmium-doped silica fibre lasers.

    Science.gov (United States)

    Hemming, Alexander; Bennetts, Shayne; Simakov, Nikita; Davidson, Alan; Haub, John; Carter, Adrian

    2013-02-25

    We report the highest power operation of a resonantly cladding-pumped, holmium-doped silica fibre laser. The cladding pumped all-glass fibre utilises a fluorine doped glass layer to provide low loss cladding guidance of the 1.95 µm pump radiation. The operation of both single mode and large-mode area fibre lasers was demonstrated, with up to 140 W of output power achieved. A slope efficiency of 59% versus launched pump power was demonstrated. The free running emission was measured to be 2.12-2.15 µm demonstrating the potential of this architecture to address the long wavelength operation of silica based fibre lasers with high efficiency.

  10. Seismic fragility capacity of equipment--horizontal shaft pump test

    International Nuclear Information System (INIS)

    Iijima, T.; Abe, H.; Suzuki, K.

    2005-01-01

    The current seismic fragility capacity of horizontal shaft pump is 1.6 x 9.8 m/s 2 (1.6 g), which was decided from previous vibration tests and we believe that it must have sufficient margin. The purpose of fragility capacity test is to obtain realistic seismic fragility capacity of horizontal shaft pump by vibration tests. Reactor Building Closed Cooling Water (RCW) Pump was tested as a typical horizontal shaft pump, and then bearings and liner rings were tested as important parts to evaluate critical acceleration and dispersion. Regarding RCW pump test, no damage was found, though maximum input acceleration level was 6 x 9.8 m/s 2 (6 g). Some kinds of bearings and liner rings were tested on the element test. Input load was based on seismic motion which was same with the RCW pump test, and maximum load was equivalent to over 20 times of design seismic acceleration. There was not significant damage that caused emergency stop of pump but degradation of surface roughness was found on some kinds of bearings. It would cause reduction of pump life, but such damage on bearings occurred under large seismic load condition that was equivalent to over 10 to 20 g force. Test results show that realistic fragility capacity of horizontal shaft pump would be at least four times as higher as current value which has been used for our seismic PSA. (authors)

  11. Performance test of a ceramic turbo-viscous pump

    International Nuclear Information System (INIS)

    Abe, Tetsuya; Hiroki, Seiji; Murakami, Yoshio; Shiraishi, Shigeyuki; Totoura, Sadayuki; Ohtaki, Takashi.

    1994-01-01

    In the special fields of nuclear fusion facilities and semiconductor production installation, the development of new vacuum pumps which can cope with strong magnetic fields, high temperature gas and corrosive gas is demanded. Mitsubishi Heavy Industries Ltd. has advanced the development of ceramic turbo-molecular pumps and ceramic turbo-viscous pumps, which use ceramic rotors and gas bearings since 1985. The evaluation test of the ceramic turbo-viscous vacuum pump CT-3000H which can evacuate from atmospheric pressure to high vacuum with one pump was carried out, and the experimental results on the performance and the reliability were obtained, therefore, those are reported in this paper. The structure, specification and features of the CT-3000H are shown. The exhaust performance test of the pump was carried out in conformity with the standard of the Vacuum Society of Japan, JVIS 005 'Method of performance test for turbo-molecular pumps'. The gases used were nitrogen and helium. The results are shown. The exhaust test from atmospheric pressure was carried out by two methods, and the results are shown. (K.I.)

  12. Pre-operative pain and sensory function in groin hernia

    DEFF Research Database (Denmark)

    Aasvang, Eske K; Hansen, Jeanette B; Kehlet, Henrik

    2009-01-01

    BACKGROUND: Although persistent postherniotomy occurs in 5-10% of patients, pathogenic mechanisms remain debatable. Since pre-operative pain has been demonstrated to be a risk factor for persistent postherniotomy pain, pre-operative alterations in nociceptive function may be a potential pathogenic...... mechanism. AIMS: To investigate the correlation between pre-operative pain intensity and sensory functions in the groin hernia area. METHODS: Patients with unilateral groin hernia were examined preoperatively by quantitative sensory testing (thermal, mechanical, and pressure [detection and pain thresholds...... (7%), all whom experienced no pain or pain less than weekly. Only cool detection thresholds were significantly lower between the hernia vs. contralateral side (poperative groin hernia...

  13. Centrifugal pumps: fundamentals and classification

    International Nuclear Information System (INIS)

    Solar Manuel, A. M.

    2009-01-01

    Centrifugal pumps are usually employed to impulse water to elevate it, dose it or give it pressure or speed. They can be used with clean water or loaded with high solid concentration and don't work properly with air or another gas flow. There are another less used pumps, coming from volumetric or ram pumps to magnetic ones for specific uses. Centrifugal ones are rotokinetic pumps, like peripherical or lateral channel pumps. They work in a different way that non rotational kinetic ones and static ones. The work approaches their pre definition, selection, installation, operation and maintenance. It also review their morphology, hidromechanic principles and the basic elements pumps are made of. (Author)

  14. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  15. Modeling Optimal Scheduling for Pumping System to Minimize Operation Cost and Enhance Operation Reliability

    Directory of Open Access Journals (Sweden)

    Yin Luo

    2012-01-01

    Full Text Available Traditional pump scheduling models neglect the operation reliability which directly relates with the unscheduled maintenance cost and the wear cost during the operation. Just for this, based on the assumption that the vibration directly relates with the operation reliability and the degree of wear, it could express the operation reliability as the normalization of the vibration level. The characteristic of the vibration with the operation point was studied, it could be concluded that idealized flow versus vibration plot should be a distinct bathtub shape. There is a narrow sweet spot (80 to 100 percent BEP to obtain low vibration levels in this shape, and the vibration also follows similar law with the square of the rotation speed without resonance phenomena. Then, the operation reliability could be modeled as the function of the capacity and rotation speed of the pump and add this function to the traditional model to form the new. And contrast with the tradition method, the result shown that the new model could fix the result produced by the traditional, make the pump operate in low vibration, then the operation reliability could increase and the maintenance cost could decrease.

  16. Electromechanical performance analysis of inflated dielectric elastomer membrane for micro pump applications

    Science.gov (United States)

    Saini, Abhishek; Ahmad, Dilshad; Patra, Karali

    2016-04-01

    Dielectric elastomers have received a great deal of attention recently as potential materials for many new types of sensors, actuators and future energy generators. When subjected to high electric field, dielectric elastomer membrane sandwiched between compliant electrodes undergoes large deformation with a fast response speed. Moreover, dielectric elastomers have high specific energy density, toughness, flexibility and shape processability. Therefore, dielectric elastomer membranes have gained importance to be applied as micro pumps for microfluidics and biomedical applications. This work intends to extend the electromechanical performance analysis of inflated dielectric elastomer membranes to be applied as micro pumps. Mechanical burst test and cyclic tests were performed to investigate the mechanical breakdown and hysteresis loss of the dielectric membrane, respectively. Varying high electric field was applied on the inflated membrane under different static pressure to determine the electromechanical behavior and nonplanar actuation of the membrane. These tests were repeated for membranes with different pre-stretch values. Results show that pre-stretching improves the electromechanical performance of the inflated membrane. The present work will help to select suitable parameters for designing micro pumps using dielectric elastomer membrane. However this material lacks durability in operation.This issue also needs to be investigated further for realizing practical micro pumps.

  17. Extension of Operating Range in Pump-Turbines. Influence of Head and Load

    Directory of Open Access Journals (Sweden)

    Carme Valero

    2017-12-01

    Full Text Available Due to the increasing share of new renewable energies like wind and solar in the generation of electricity the need for power regulation and energy storage is becoming of paramount importance. One of the systems to store huge amounts of energy is pumped storage using reversible hydropower units. The machines used in these power plants are pump-turbines, which can operate as a pump and as a turbine. The surplus of electrical energy during low consumption hours can be converted into potential hydraulic energy by pumping water to a higher level. The stored energy can be converted into electricity again by operating the runner as a turbine. Due to new regulation requirements machines have to extend the operating range in order to match energy generation with consumption for the grid stability. In this paper the consequences of extending the operating range in existing pump-turbines have been studied. For that purpose, the data obtained after two years of condition monitoring were analyzed. Vibrations and pressure fluctuations of two pump-turbines of 85 MW each have been studied during pump and turbine operation. For turbine operation the effects of extending the operating range from the standard range of 45–85 MW to and increased range of 20–85 MW were analyzed. The change in vibration levels and signatures at very low load are presented with the identification of the phenomena that occur under these conditions. The influence of head in the vibration behavior is also presented. The appearance of fluid instabilities generated at part load that may produce power swing is also presented. Finally, the effect of head on the vibration levels for pump operation is shown and analyzed.

  18. Testing of an Annular Linear Induction Pump for the Fission Surface Power Technology Demonstration Unit

    Science.gov (United States)

    Polzin, K. A.; Pearson, J. B.; Webster, K.; Godfoy, T. J.; Bossard, J. A.

    2013-01-01

    Results of performance testing of an annular linear induction pump that has been designed for integration into a fission surface power technology demonstration unit are presented. The pump electromagnetically pushes liquid metal (NaK) through a specially-designed apparatus that permits quantification of pump performance over a range of operating conditions. Testing was conducted for frequencies of 40, 55, and 70 Hz, liquid metal temperatures of 125, 325, and 525 C, and input voltages from 30 to 120 V. Pump performance spanned a range of flow rates from roughly 0.3 to 3.1 L/s (4.8 to 49 gpm), and pressure heads of <1 to 104 kPa (<0.15 to 15 psi). The maximum efficiency measured during testing was 5.4%. At the technology demonstration unit operating temperature of 525 C the pump operated over a narrower envelope, with flow rates from 0.3 to 2.75 L/s (4.8 to 43.6 gpm), developed pressure heads from <1 to 55 kPa (<0.15 to 8 psi), and a maximum efficiency of 3.5%. The pump was supplied with three-phase power at 40 and 55 Hz using a variable-frequency motor drive, while power at 55 and 70 Hz was supplied using a variable-frequency power supply. Measured performance of the pump at 55 Hz using either supply exhibited good quantitative agreement. For a given temperature, the peak in efficiency occurred at different flow rates as the frequency was changed, but the maximum value of efficiency was relative insensitive within 0.3% over the frequency range tested, including a scan from 45 to 78 Hz. The objectives of the FSP technology project are as follows:5 • Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. • Establish a nonnuclear hardware-based technical foundation for FSP design concepts to reduce overall development risk. • Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. • Generate the key nonnuclear products to allow Agency

  19. Residential gas-fired sorption heat pumps. Test and technology evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Naeslund, M.

    2008-12-15

    Heat pumps may be the next step in gas-fired residential space heating. Together with solar energy it is an option to combine natural gas and renewable energy. Heat pumps for residential space heating are likely to be based on the absorption or adsorption process, i.e. sorption heat pumps. Manufacturers claim that the efficiency could reach 140-160%. The annual efficiency will be lower but it is clear that gas-fired heat pumps can involve an efficiency and technology step equal to the transition from non-condensing gas boilers with atmospheric burners to condensing boilers. This report contains a review of the current sorption gas-fired heat pumps for residential space heating and also the visible development trends. A prototype heat pump has been laboratory tested. Field test results from Germany and the Netherlands are also used for a technology evaluation. The tested heat pump unit combines a small heat pump and a supplementary condensing gas boiler. Field tests show an average annual efficiency of 120% for this prototype design. The manufacturer abandoned the tested design during the project period and the current development concentrates on a heat pump design only comprising the heat pump, although larger. The heat pump development at three manufacturers in Germany indicates a commercial stage around 2010-2011. A fairly high electricity consumption compared to traditional condensing boilers was observed in the tested heat pump. Based on current prices for natural gas and electricity the cost savings were estimated to 12% and 27% for heat pumps with 120% and 150% annual efficiency respectively. There is currently no widespread performance testing procedure useful for annual efficiency calculations of gas-fired heat pumps. The situation seems to be clearer for electric compression heat pumps regarding proposed testing and calculation procedures. A German environmental label exists and gasfired sorption heat pumps are also slightly treated in the Eco-design work

  20. High-vacuum plasma pump

    International Nuclear Information System (INIS)

    Dorodnov, A.M.; Minajchev, V.E.; Miroshkin, S.I.

    1980-01-01

    The action of an electric-arc high-vacuum pump intended for evacuating the volumes in which the operation processes are followed by a high gas evolution is considered. The operation of the pump is based on the principle of controlling the getter feed according to the gas load and effect of plasma sorbtion pumping. The pump performances are given. The starting pressure is about 5 Pa, the limiting residual pressure is about 5x10 -6 Pa, the pumping out rate of nitrogen in the pressure range 5x10 -5 -5x10 -3 Pa accounts for about 4000 l/s, the power consumption comes to 6 kW. Analyzing the results of the test operation of the pump, it has been concluded that its principal advantages are the high starting pressure, controlled getter feed rate and possibility of pumping out the gases which are usually pumped out with difficulty. The operation reliability of the pump is defined mainly by reliable operation of the ignition system of the vacuum arc [ru

  1. Pumping mechanisms in sputter-ion pumps low pressure operation

    International Nuclear Information System (INIS)

    Welch, K.M.

    1991-01-01

    It is shown that significant H 2 pumping occurs in the walls of triode pumps. Also, H 2 is pumped in the anode cells of sputter-ion pumps. This pumping occurs in a manner similar to that by which the inert gases are pumped. That is, H 2 is pumped in the walls of the anode cells by high energy neutral burial. Hydrogen in the pump walls and anodes limits the base pressure of the pump

  2. Clinical target volume delineation in glioblastomas: pre-operative versus post-operative/pre-radiotherapy MRI

    Science.gov (United States)

    Farace, P; Giri, M G; Meliadò, G; Amelio, D; Widesott, L; Ricciardi, G K; Dall'Oglio, S; Rizzotti, A; Sbarbati, A; Beltramello, A; Maluta, S; Amichetti, M

    2011-01-01

    Objectives Delineation of clinical target volume (CTV) is still controversial in glioblastomas. In order to assess the differences in volume and shape of the radiotherapy target, the use of pre-operative vs post-operative/pre-radiotherapy T1 and T2 weighted MRI was compared. Methods 4 CTVs were delineated in 24 patients pre-operatively and post-operatively using T1 contrast-enhanced (T1PRECTV and T1POSTCTV) and T2 weighted images (T2PRECTV and T2POSTCTV). Pre-operative MRI examinations were performed the day before surgery, whereas post-operative examinations were acquired 1 month after surgery and before chemoradiation. A concordance index (CI) was defined as the ratio between the overlapping and composite volumes. Results The volumes of T1PRECTV and T1POSTCTV were not statistically different (248 ± 88 vs 254 ± 101), although volume differences >100 cm3 were observed in 6 out of 24 patients. A marked increase due to tumour progression was shown in three patients. Three patients showed a decrease because of a reduced mass effect. A significant reduction occurred between pre-operative and post-operative T2 volumes (139 ± 68 vs 78 ± 59). Lack of concordance was observed between T1PRECTV and T1POSTCTV (CI = 0.67 ± 0.09), T2PRECTV and T2POSTCTV (CI = 0.39 ± 0.20) and comparing the portion of the T1PRECTV and T1POSTCTV not covered by that defined on T2PRECTV images (CI = 0.45 ± 0.16 and 0.44 ± 0.17, respectively). Conclusion Using T2 MRI, huge variations can be observed in peritumoural oedema, which are probably due to steroid treatment. Using T1 MRI, brain shifts after surgery and possible progressive enhancing lesions produce substantial differences in CTVs. Our data support the use of post-operative/pre-radiotherapy T1 weighted MRI for planning purposes. PMID:21045069

  3. Pumping mechanisms in sputter-ion pumps low pressure operation

    International Nuclear Information System (INIS)

    Welch, K.M.

    1991-01-01

    It is shown that significant H 2 pumping occurs in the walls of triode pumps. Also, H 2 is pumped in the anode cells of sputter-ion pumps. This pumping occurs in a manner similar to that by which the inert gases are pumped. That is, H 2 pumped in the walls of the anode cells by high energy neutral burial. Hydrogen in the pump walls and anodes limits the base pressure of the pump. 13 refs., 5 figs., 1 tab

  4. Design retrofit to prevent damage due to heat transport pump operation under conditions of significant void

    Energy Technology Data Exchange (ETDEWEB)

    Lam, K F [Bruce Engineering Department, In-Service Nuclear Projects, Ontario Hydro, North York, ON (Canada)

    1991-04-01

    The purpose of this paper is to provide a general review of certain key design areas which address the safety concerns of HT pump operation under conditions of significant void. To illustrate the challenges confronting designers and analysts, some of the highlights during the design of a protective system to prevent damage to HT piping and pump supports at Bruce NGS 'A' are outlined. The effects of this protective system on reactor safety are also discussed. HI pump operation under conditions of significant void offers a major challenge to designers and analysts to ensure that pump induced vibration and its effects on pump and piping are addressed. For an in-service station the search for a practical solution is often limited by existing. station equipment design and Layout. The diversity of design verification process requires a major commitment of engineering resources to ensure all. safety aspects meet the requirements of regulatory body. Work currently undertaken at Ontario Hydro Research Pump Test Complex on two-phase flow in pumps and piping may provide better prediction of vibration characteristics so that inherent conservativeness in fatigue Life prediction of HI system components can be reduced.

  5. Design retrofit to prevent damage due to heat transport pump operation under conditions of significant void

    International Nuclear Information System (INIS)

    Lam, K.F.

    1991-01-01

    The purpose of this paper is to provide a general review of certain key design areas which address the safety concerns of HT pump operation under conditions of significant void. To illustrate the challenges confronting designers and analysts, some of the highlights during the design of a protective system to prevent damage to HT piping and pump supports at Bruce NGS 'A' are outlined. The effects of this protective system on reactor safety are also discussed. HI pump operation under conditions of significant void offers a major challenge to designers and analysts to ensure that pump induced vibration and its effects on pump and piping are addressed. For an in-service station the search for a practical solution is often limited by existing. station equipment design and Layout. The diversity of design verification process requires a major commitment of engineering resources to ensure all. safety aspects meet the requirements of regulatory body. Work currently undertaken at Ontario Hydro Research Pump Test Complex on two-phase flow in pumps and piping may provide better prediction of vibration characteristics so that inherent conservativeness in fatigue Life prediction of HI system components can be reduced

  6. Low-Cost Control System Built Upon Consumer-Based Electronics For Supervisory Control Of A Gas-Operated Heat Pump

    Energy Technology Data Exchange (ETDEWEB)

    Wetherington Jr, G Randall [ORNL; Vineyard, Edward Allan [ORNL; Mahderekal, Isaac [ORNL; Abu-Heiba, Ahmad [ORNL

    2017-06-01

    A preliminary evaluation of the performance of a consumer-based control system was conducted by the Oak Ridge National Laboratory (ORNL) and Southwest Gas as part of a cooperative research and development agreement (CRADA) authorized by the Department of Energy (DOE) (Mahderekal et al. (2013). The goal of the research was to evaluate the low-cost approach as a solution for implementing a supervisory control system for a residential gas-operated heat pump. The design incorporated two consumer-based micro-controllers; the Arduino Mega-2650 and the BeagleBone (white). Ten five-ton heat pump systems were designed, fabricated, and operationally tested in the Las Vega NV region. A robust data set was produced that allowed detailed assessment of the reliability and the operational perfromance of the newly developed control system. Experiences gained from the test provided important points of improvement for subsequent evolution of the heat pump technology.

  7. Failure cause and failure rate evaluation on pumps of BWR plants in PSA. Hypothesis testing for typical or plant specific failure rate of pumps

    International Nuclear Information System (INIS)

    Sanada, Takahiro; Nakamura, Makoto

    2009-01-01

    In support of domestic nuclear industry effort to gather and analyze failure data of components concerning nuclear power plants, Nuclear Information Archives (NUCIA) are published for useful information to help PSA. This report focuses on NUCIA pertaining to pumps in domestic nuclear power plants, and provides the reliable estimation on failure rate of pumps resulting from failure cause analysis and hypothesis testing of classified and plant specific failure rate of pumps for improving quality in PSA. The classified and plant specific failure rate of pumps are estimated by analyzing individual domestic nuclear power plant's data of 26 Boiling Water Reactors (BWRs) concerning functionally structurally classified pump failures reported from beginning of commercial operation to March 31, 2007. (author)

  8. LH2 pump component development testing in the electric pump room at test cell C inducer no. 1

    Science.gov (United States)

    Andrews, F. X.; Brunner, J. J.; Kirk, K. G.; Mathews, J. P.; Nishioka, T.

    1972-01-01

    The characteristics of a turbine pump for use with the nuclear engine for rocket vehicles are discussed. It was determined that the pump will be a two stage centrifugal pump with both stages having backswept impellers and an inducer upstream of the first stage impeller. The test program provided demonstration of the ability of the selected design to meet the imposed requirements.

  9. D0 HVAC System Heat Pump Controller Programming, Networking, and Operating Information

    International Nuclear Information System (INIS)

    Anderson, B.

    1999-01-01

    The purpose of this engineering note is to provide the necessary information to setup, program, and network the Electronic Systems USA Heat Pump Controller with the LON network card and Intellution Fix32 to operate properly within the HVAC system at D-Zero. The heat pump controllers are used for local temperature control of the office environments on the fifth and six floors of D-Zero. Heat pump units 1-6 are located in the ceiling of the sixth floor. Heat pump units 7-12 are found in the fifth floor ceiling. Heat pump unit 13 is in the Southeast corner of the fifth floor. Prior to installation the heat pump controller must be properly prepared to operate correctly in the HVAC system. Each heat pump unit must contain firmware (software) version 1.31 to operate properly on the network. Controllers with version 1.30 will not be able to communicate over the LON network. The manufacturer can only update the firmware version. Before installation a series of heat pump setpoints must be manually set using the Intelligent Stat. Connect the Intelligent Stat via the serial cable or wired connection.

  10. System of Thermal Balance Maintenance in Modern Test Benches for Centrifugal Pumps

    Directory of Open Access Journals (Sweden)

    A. I. Petrov

    2015-01-01

    Full Text Available The article “Systems of the heat balance maintenance in modern test benches for centrifugal pumps” makes the case to include cooling systems of a working fluid (heat setting in test bench for impeller pumps. It briefly summarizes an experience of bench building to test centrifugal pumps, developed at the BMSTU Department E-10 over the last 10 years. The article gives the formulas and the algorithm to calculate the heat capacity of different types of impeller pumps when tested at the bench as ell as to determine the heating time of the liquid in the bench without external cooling. Based on analysis of the power balance of a centrifugal pump, it is shown that about 90% of the pump unit-consumed electric power in terminals is used for heating up the working fluid in the loop of the test bench. The article gives examples of elementary heat calculation of the pump operation within the test bench. It presents the main types of systems to maintain thermal balance, their advantages, disadvantages and possible applications. The cooling system schemes for open and closed version of the benches both with built-in and with an independent cooling circuit are analysed. The paper separately considers options of such systems for large benches using the cooling tower as a cooling device in the loop, and to test the pumps using the hydraulic fluids other than water, including those at high temperatures of working fluids; in the latter case a diagram of dual-circuit cooling system "liquid-liquid-air" is shown. The paper depicts a necessity to use ethylene glycol coolant in the two-loop cooling bench. It provides an example of combining the functions of cooling and filtration in a single cooling circuit. Criteria for effectiveness of these systems are stated. Possible ways for developing systems to maintain a thermal balance, modern methods of regulation and control are described. In particular, the paper shows the efficiency of frequency control of the

  11. Installation and initial operation of the DIII-D advanced divertor cryocondensation pump

    International Nuclear Information System (INIS)

    Smith, J.P.; Schaubel, K.M.; Baxi, C.B.; Campbell, G.L.; Hyatt, A.W.; Laughon, G.J.; Mahdavi, M.A.; Reis, E.E.; Schaffer, M.J.; Sevier, D.L.; Stambaugh, R.D.; Menon, M.M.

    1993-10-01

    Phase two of a divertor cryocondensation pump, the Advanced Divertor Program, is now installed in the DIII-D tokamak at General Atomics and complements the phase one biasable ring electrode. The installation consists of a 10 m long cryocondensation pump located in the divertor baffle chamber to study plasma density control by pumping of the divertor. The design is a toroidally electrically continuous liquid helium-cooled panel with 1 m 2 of pumping surface. The helium panel is single point grounded to the nitrogen shield to minimize eddy currents. The nitrogen shield is toroidally continuous and grounded to the vacuum vessel in 24 locations to prevent voltage potentials from building up between the pump and vacuum vessel wall. A radiation/particle shield surrounds the nitrogen-cooled surface to minimize the heat load and prevent water molecules condensed on the nitrogen surface from being released by impact of energetic particles. Large currents (>5000 A) are driven in the helium and nitrogen panels during ohmic coil ramp up and during disruptions. The pump is designed to accommodate both the thermal and mechanical loads due to these currents. A feedthrough for the cryogens allows for both radial and vertical motion of the pump with respect to the vacuum vessel. Thermal performance measured on a prototype verified the analytical model and thermal design of the pump. Characterization tests of the installed pump show the pumping speed in deuterium is 42,000 ell/sec for a pressure of 5 mTorr. Induction heating of the pump (at 300 W) resulted in no degradation of pumping speed. Plasma operations with the cryopump show a 60% lower density in H-mode

  12. An anaesthetic pre-operative assessment clinic reduces pre-operative inpatient stay in patients requiring major vascular surgery.

    LENUS (Irish Health Repository)

    O'Connor, D B

    2012-02-01

    BACKGROUND: Patients undergoing major vascular surgery (MVS) require extensive anaesthetic assessment. This can require extended pre-operative stays. AIMS: We investigated whether a newly established anaesthetic pre-operative assessment clinic (PAC) would reduce the pre-operative inpatient stay, avoid unnecessary investigations and facilitate day before surgery (DBS) admissions for patients undergoing MVS. PATIENT AND METHODS: One year following and preceding the establishment of the PAC the records of patients undergoing open or endovascular aortic aneurysm repair, carotid endarterectomy and infra-inguinal bypass were reviewed to measure pre-operative length of stay (LoS). RESULTS: Pre-operative LoS was significantly reduced in the study period (1.85 vs. 4.2 days, respectively, P < 0.0001). Only 12 out of 61 patients in 2007 were admitted on the DBS and this increased to 33 out of 63 patients (P = 0.0002). No procedure was cancelled for medical reasons. CONCLUSION: The PAC has facilitated accurate outpatient anaesthetic assessment for patients requiring MVS. The pre-operative in-patient stay has been significantly reduced.

  13. Operation performance investigation of ground-coupled heat-pump system for temperate region

    OpenAIRE

    Yi Man; Hongxing Yang; Jinggang Wang; Zhaohong Fang

    2010-01-01

    In order to investigate the operation performance of ground-coupled heat-pump (GCHP) system, an analytical simulation model of GCHP system on short time-step basis and a computer program based on this model to predict system operating parameters are developed in this study. Besides, detailed on-site experiments on GCHP test rig installed in a temperate region of China are carried out. The temperature distributions of borehole as well as ground around borehole at different depths are evaluated...

  14. Operating experience feedback report: Experience with pump seals installed in reactor coolant pumps manufactured by Byron Jackson

    International Nuclear Information System (INIS)

    Bell, L.G.; O'Reilly, P.D.

    1992-09-01

    This report examines the reactor coolant pump (RCP) seal operating experience through August 1990 at plants with Byron Jackson (B-J) RCPs. ne operating experience examined in this analysis included a review of the practice of continuing operation with a degraded seal. Plants with B-J RCPs that have had relatively good experience with their RCP seals attribute this success to a combination of different factors, including: enhanced seal QA efforts, modified/new seal designs, improved maintenance procedures and training, attention to detail, improved seal operating procedures, knowledgeable personnel involved in seal maintenance and operation, reduction in frequency of transients that stress the seals, seal handling and installation equipment designed to the appropriate precision, and maintenance of a clean seal cooling water system. As more plants have implemented corrective measures such as these, the number of B-J RCP seal failures experienced has tended to decrease. This study included a review of the practice of continued operation with a degraded seal in the case of PWR plants with Byron Jackson reactor coolant pumps. Specific factors were identified which should be addressed in order to safety manage operation of a reactor coolant pump with indications of a degrading seal

  15. Mixer pump long term operations plan for Tank 241-SY-101 mitigation

    International Nuclear Information System (INIS)

    Irwin, J.J.

    1994-01-01

    This document provides the general Operations Plan for performance of the mixer pump long term operations for Tank 241-SY-101 mitigation of gas retention and periodic release in Tank 101-SY. This operations plan will utilize a 112 kW (150 hp) mixing pump to agitate/suspend the particulates in the tank

  16. Groundwater heat pump performance improvement with pre-coolers and pump modification: Final report for the 1985-86 SOMED (School of Mines and Energy Development) project year

    Energy Technology Data Exchange (ETDEWEB)

    Kavanaugh, S.

    1986-09-30

    Improved performance of groundwater heat pumps can be realized with a more effective and efficient utilization of the thermal properties of shallow groundwater. These systems circulate water from aquifers through water source heat pumps to achieved high efficiencies and capacities. This project concludes that a 10 to 15 percent cooling performance improvement can be realized by pre-cooling the room air with the 55/sup 0/ to 67/sup 0/F groundwater available in large portions of the Southeast. Proper design of these pre-coolers eliminates unnecessary auxiliary energy requirements. The efficiency of the overall system can be further improved with modifications to current methods of water circulation system design. Pressure requirements are minimized by maintaining a low unit inlet pressure (8 psig maximum), removing unnecessary loop restrictions and injection below the water table. Standard submersible water pumps exceed the resulting required size for residential groundwater heat pumps. Simple modifications can be made by the manufacturer to correct this problem. The result is an overall 15 to 40 percent performance improvement over high efficiency air source heat pumps with a simple payback of between 0 to 10 years in most cases.

  17. Pre-operative haematological investigations in paediatric orofacial ...

    African Journals Online (AJOL)

    Pre-operative haematological investigations in paediatric orofacial cleft repair: Any relevance to management outcome? ... Aim and Objectives: To determine the value of routine pre-operative haematologic investigations in children undergoing orofacial cleft repair. Background: Although routine pre-operative laboratory ...

  18. Hydraulic design of a boiler feed pump to ensure stable operation at reduced flows

    International Nuclear Information System (INIS)

    Singal, R.K.

    1991-01-01

    The boiler feed pumps for industrial and power station boilers have to operate often at reduced capacities to meet the changing demand of steam and electricity. The operation of centrifugal pumps at reduced capacities lead to a number of unfavourable results seriously affecting the pump reliability. Some of these, such as internal recirculation of flow inside the pump have been recently studied. The paper discusses these unfavourable results and analyses various design factors which can control unstable operation of the pumps at reduced flows. The commissioning problems of boiler feed pumps faced at Rajasthan Atomic Power Plant at Kota and modifications carried out in the light of the above studies are described in the paper. (author). 2 tabs

  19. AP1000 passive core cooling system pre-operational tests procedure definition and simulation by means of Relap5 Mod. 3.3 computer code

    International Nuclear Information System (INIS)

    Lioce, D.; Asztalos, M.; Alemberti, A.; Barucca, L.; Frogheri, M.; Saiu, G.

    2012-01-01

    Highlights: ► Two AP1000 Core Make-up Tanks pre-operational tests procedures have been defined. ► The two tests have been simulated by means of the Relap5 computer code. ► Results show the tests can be successfully performed with the selected procedures. - Abstract: The AP1000 ® plant is an advanced Pressurized Water Reactor designed and developed by Westinghouse Electric Company which relies on passive safety systems for core cooling, containment isolation and containment cooling, and maintenance of main control room emergency habitability. The AP1000 design obtained the Design Certification by NRC in January 2006, as Appendix D of 10 CFR Part 52, and it is being built in two locations in China. The AP1000 plant will be the first commercial nuclear power plant to rely on completely passive safety systems for core cooling and its licensing process requires the proper operation of these systems to be demonstrated through some pre-operational tests to be conducted on the real plant. The overall objective of the test program is to demonstrate that the plant has been constructed as designed, that the systems perform consistently with the plant design, and that activities culminating in operation at full licensed power including initial fuel load, initial criticality, and power increase to full load are performed in a controlled and safe manner. Within this framework, Westinghouse Electric Company and its partner Ansaldo Nucleare S.p.A. have strictly collaborated, being Ansaldo Nucleare S.p.A. in charge of the simulation of some pre-operational tests and supporting Westinghouse in the definition of tests procedures. This paper summarizes the work performed at Ansaldo Nucleare S.p.A. in collaboration with Westinghouse Electric Company for the Core Makeup Tank (CMT) tests, i.e. the CMTs hot recirculation test and the CMTs draindown test. The test procedure for the two selected tests has been defined and, in order to perform the pre-operational tests simulations, a

  20. AP1000 passive core cooling system pre-operational tests procedure definition and simulation by means of Relap5 Mod. 3.3 computer code

    Energy Technology Data Exchange (ETDEWEB)

    Lioce, D., E-mail: donato.lioce@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Asztalos, M., E-mail: asztalmj@westinghouse.com [Westinghouse Electric Company, Cranberry Twp, PA 16066 (United States); Alemberti, A., E-mail: alessandro.alemberti@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Barucca, L. [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Frogheri, M., E-mail: monicalinda.frogheri@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Saiu, G., E-mail: gianfranco.saiu@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy)

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Two AP1000 Core Make-up Tanks pre-operational tests procedures have been defined. Black-Right-Pointing-Pointer The two tests have been simulated by means of the Relap5 computer code. Black-Right-Pointing-Pointer Results show the tests can be successfully performed with the selected procedures. - Abstract: The AP1000{sup Registered-Sign} plant is an advanced Pressurized Water Reactor designed and developed by Westinghouse Electric Company which relies on passive safety systems for core cooling, containment isolation and containment cooling, and maintenance of main control room emergency habitability. The AP1000 design obtained the Design Certification by NRC in January 2006, as Appendix D of 10 CFR Part 52, and it is being built in two locations in China. The AP1000 plant will be the first commercial nuclear power plant to rely on completely passive safety systems for core cooling and its licensing process requires the proper operation of these systems to be demonstrated through some pre-operational tests to be conducted on the real plant. The overall objective of the test program is to demonstrate that the plant has been constructed as designed, that the systems perform consistently with the plant design, and that activities culminating in operation at full licensed power including initial fuel load, initial criticality, and power increase to full load are performed in a controlled and safe manner. Within this framework, Westinghouse Electric Company and its partner Ansaldo Nucleare S.p.A. have strictly collaborated, being Ansaldo Nucleare S.p.A. in charge of the simulation of some pre-operational tests and supporting Westinghouse in the definition of tests procedures. This paper summarizes the work performed at Ansaldo Nucleare S.p.A. in collaboration with Westinghouse Electric Company for the Core Makeup Tank (CMT) tests, i.e. the CMTs hot recirculation test and the CMTs draindown test. The test procedure for the two

  1. Operational experience with double acting piston pumps for cryogenic helium and nitrogen

    International Nuclear Information System (INIS)

    Vosswinkel, F.

    1978-01-01

    The design of a high efficiency double acting piston pump suitable for pumping liquefied gases at cryogenic temperatures for cable cooling, is reported. The pump has proved flexible, reliable and efficient in operation. The plunger-type pumps can be used for filling cryostats or dewars with liquid helium or nitrogen from a pressure free or pressurized storage vessel, or as circulators for subcooled, saturated and/or supercritical helium in large scale cooling experiments. Flow rates of up to 17 g/s, maximum operating pressure of 600 kPa absolute and maximum differential pressure of approximately 100 kPa are obtained. (UK)

  2. Use of operational data for the assessment of pre-existing software

    International Nuclear Information System (INIS)

    Helminen, Atte; Gran, Bjoern Axel; Kristiansen, Monica; Winther, Rune

    2004-01-01

    To build sufficient confidence on the reliability of the safety systems of nuclear power plants all available sources of information should be used. One important data source is the operational experience collected for the system. The operational experience is particularly applicable for systems of pre-existing software. Even though systems and devices involving pre-existing software are not considered for the functions of highest safety levels of nuclear power plants, they will most probably be introduced to functions of lower safety levels and to none-safety related applications. In the paper we shortly discuss the use of operational experience data for the reliability assessment of pre-existing software in general, and the role of pre-existing software in relation to safety applications. Then we discuss the modelling of operational profiles, the application of expert judgement on operational profiles and the need of a realistic test case. Finally, we discuss the application of operational experience data in Bayesian statistics. (Author)

  3. Experimental investigations on a common centrifugal pump operating under gas entrainment conditions

    Energy Technology Data Exchange (ETDEWEB)

    Schäfer, Thomas, E-mail: thomas.schaefer@hzdr.de [Helmholtz-Zentrum Dresden-Rossendorf, Institute of Fluid Dynamics (Germany); Neumann, Martin [Technische Universität Dresden, AREVA Endowed Chair of Imaging Techniques in Energy and Process Engineering (Germany); Bieberle, André [Helmholtz-Zentrum Dresden-Rossendorf, Institute of Fluid Dynamics (Germany); Hampel, Uwe [Helmholtz-Zentrum Dresden-Rossendorf, Institute of Fluid Dynamics (Germany); Technische Universität Dresden, AREVA Endowed Chair of Imaging Techniques in Energy and Process Engineering (Germany)

    2017-05-15

    Highlights: • The pump performance has been evaluated for several gas entrainment conditions. • The gas entraining flow regime has a large impact on the pump performance. • High-resolution gamma-ray computed tomography (HireCT) has been applied. • Gas holdup inside the operating impeller has been visualized and quantified. • Gas holdup profiles along selected streamlines have been calculated. - Abstract: This paper presents an experimental study on the effects of additional gas entrainment in centrifugal pumps designed for conveying liquid phases only. The pump performance has been evaluated for several gas entrainment conditions, and for various operational settings of the pump, such as its alignment and the rotational speed of the impeller. As a main performance indicator the impact of entrained gas on the hydraulic power of the pump has been analyzed using experimental data. Additionally, high-resolution gamma-ray computed tomography (HireCT) operated in time-averaged rotation-synchronized scanning mode has been applied to quantify local phase fraction distributions inside the rapidly rotating pump impeller. Based on these quantitative tomographic measurements, gas holdup profiles along selected streamlines have been calculated and gas accumulation areas inside the impeller chambers have been visualized. Thus, various internally accumulated gas holdup patterns have been identified and, eventually, associated with characteristic pump performance behaviors. Moreover, the tomographic measuring method allowed an enhanced gas holdup analysis in specified pump compartments. As a result, the related specific gas and liquid phase holdup profiles have been evaluated.

  4. Experimental investigations on a common centrifugal pump operating under gas entrainment conditions

    International Nuclear Information System (INIS)

    Schäfer, Thomas; Neumann, Martin; Bieberle, André; Hampel, Uwe

    2017-01-01

    Highlights: • The pump performance has been evaluated for several gas entrainment conditions. • The gas entraining flow regime has a large impact on the pump performance. • High-resolution gamma-ray computed tomography (HireCT) has been applied. • Gas holdup inside the operating impeller has been visualized and quantified. • Gas holdup profiles along selected streamlines have been calculated. - Abstract: This paper presents an experimental study on the effects of additional gas entrainment in centrifugal pumps designed for conveying liquid phases only. The pump performance has been evaluated for several gas entrainment conditions, and for various operational settings of the pump, such as its alignment and the rotational speed of the impeller. As a main performance indicator the impact of entrained gas on the hydraulic power of the pump has been analyzed using experimental data. Additionally, high-resolution gamma-ray computed tomography (HireCT) operated in time-averaged rotation-synchronized scanning mode has been applied to quantify local phase fraction distributions inside the rapidly rotating pump impeller. Based on these quantitative tomographic measurements, gas holdup profiles along selected streamlines have been calculated and gas accumulation areas inside the impeller chambers have been visualized. Thus, various internally accumulated gas holdup patterns have been identified and, eventually, associated with characteristic pump performance behaviors. Moreover, the tomographic measuring method allowed an enhanced gas holdup analysis in specified pump compartments. As a result, the related specific gas and liquid phase holdup profiles have been evaluated.

  5. Operating experience of steam generator test facility

    International Nuclear Information System (INIS)

    Sureshkumar, V.A.; Madhusoodhanan, G.; Noushad, I.B.; Ellappan, T.R.; Nashine, B.K.; Sylvia, J.I.; Rajan, K.K.; Kalyanasundaram, P.; Vaidyanathan, G.

    2006-01-01

    Steam Generator (SG) is the vital component of a Fast Reactor. It houses both water at high pressure and sodium at low pressure separated by a tube wall. Any damage to this barrier initiates sodium water reaction that could badly affect the plant availability. Steam Generator Test Facility (SGTF) has been set up in Indira Gandhi Centre for Atomic Research (IGCAR) to test sodium heated once through steam generator of 19 tubes similar to the PFBR SG dimension and operating conditions. The facility is also planned as a test bed to assess improved designs of the auxiliary equipments used in Fast Breeder Reactors (FBR). The maximum power of the facility is 5.7 MWt. This rating is arrived at based on techno economic consideration. This paper covers the performance of various equipments in the system such as Electro magnetic pumps, Centrifugal sodium pump, in-sodium hydrogen meters, immersion heaters, and instrumentation and control systems. Experience in the system operation, minor modifications, overall safety performance, and highlights of the experiments carried out etc. are also brought out. (author)

  6. Laboratory evaluation of the emulsifying characteristics of pumps

    Energy Technology Data Exchange (ETDEWEB)

    Harvey, A.C.; Guzdar, A.R.; Friswell, D.R.

    1973-10-01

    The program was devoted to a laboratory investigation of the emulsifying characteristics of different pumps suitable for shipboard pumping of bilge and ballast water oily wastes. The tests were designed to investigate the effect of several parameters, such as oil type, input oil concentration, detergent, pump operating characteristics (pressure and flow rate), and salt vs. fresh water, on emulsification. Tests were conducted on the Foster-Miller test loop. No. 2 fuel oil, lubricating oil and No. 6 fuel oil were the oils tested at concentrations ranging from 1 to 10%. The oils were tested with and without the addition of 10% Gamlen D surfactant. The pumps used were a Parker Diaphragm pump, a Blackmer Sliding Vane pump, an Ingersoll Rand Centrifugal pump, and a Deming Centrifugal pump. Pump pressure ranged from 10 to 60 psi and flow rates from 10 to 100 gpm. A total of 270 tests was conducted covering 198 different operating points, 108 concerning pump comparison, 54 concerning oil concentration and surfactant, and 45 concerning salt water.

  7. Pre-operative biliary drainage for obstructive jaundice

    Science.gov (United States)

    Fang, Yuan; Gurusamy, Kurinchi Selvan; Wang, Qin; Davidson, Brian R; Lin, He; Xie, Xiaodong; Wang, Chaohua

    2014-01-01

    Background Patients with obstructive jaundice have various pathophysiological changes that affect the liver, kidney, heart, and the immune system. There is considerable controversy as to whether temporary relief of biliary obstruction prior to major definitive surgery (pre-operative biliary drainage) is of any benefit to the patient. Objectives To assess the benefits and harms of pre-operative biliary drainage versus no pre-operative biliary drainage (direct surgery) in patients with obstructive jaundice (irrespective of a benign or malignant cause). Search methods We searched the Cochrane Hepato-Biliary Group Controlled Trials Register, Cochrane Central Register of Controlled Clinical Trials (CENTRAL) in The Cochrane Library, MEDLINE, EMBASE, and Science Citation Index Expanded until February 2012. Selection criteria We included all randomised clinical trials comparing biliary drainage followed by surgery versus direct surgery, performed for obstructive jaundice, irrespective of the sample size, language, and publication status. Data collection and analysis Two authors independently assessed trials for inclusion and extracted data. We calculated the risk ratio (RR), rate ratio (RaR), or mean difference (MD) with 95% confidence intervals (CI) based on the available patient analyses. We assessed the risk of bias (systematic overestimation of benefit or systematic underestimation of harm) with components of the Cochrane risk of bias tool. We assessed the risk of play of chance (random errors) with trial sequential analysis. Main results We included six trials with 520 patients comparing pre-operative biliary drainage (265 patients) versus no pre-operative biliary drainage (255 patients). Four trials used percutaneous transhepatic biliary drainage and two trials used endoscopic sphincterotomy and stenting as the method of pre-operative biliary drainage. The risk of bias was high in all trials. The proportion of patients with malignant obstruction varied between 60

  8. HSB 84A pumping test

    Energy Technology Data Exchange (ETDEWEB)

    Maloney, W.

    2000-03-06

    Two constant discharge, multiple well pumping tests were performed in the Congaree aquifer at the H-Area seepage basins during the weeks of April 30 through May 11. The purpose of the tests was to collect information that might determine the source of groundwater contamination in the Congaree aquifer and to estimate the hydraulic parameters of the aquifer. Transmissivity estimates from data collected in Test One ranged from 1,644 ft{sup 2}/day to 2,253 ft{sup 2}/day with an average of 2,013 ft{sup 2}/day and from 1,812 ft{sup 2}/day to 2,562 ft{sup 2}/day with an average of 2,269 ft{sup 2}/day in Test Two. Some leakage through the confining bed was apparent in the vicinity of observation well HSB 69A. This report includes the data collected, the analyses, results and interpretation of the pumping tests performed at HSB 84A. It should serve as a good baseline for future studies on the subject of contaminant migration in the Congaree aquifer on the Savannah River Site.

  9. HSB 84A pumping test

    International Nuclear Information System (INIS)

    Maloney, W.

    2000-01-01

    Two constant discharge, multiple well pumping tests were performed in the Congaree aquifer at the H-Area seepage basins during the weeks of April 30 through May 11. The purpose of the tests was to collect information that might determine the source of groundwater contamination in the Congaree aquifer and to estimate the hydraulic parameters of the aquifer. Transmissivity estimates from data collected in Test One ranged from 1,644 ft 2 /day to 2,253 ft 2 /day with an average of 2,013 ft 2 /day and from 1,812 ft 2 /day to 2,562 ft 2 /day with an average of 2,269 ft 2 /day in Test Two. Some leakage through the confining bed was apparent in the vicinity of observation well HSB 69A. This report includes the data collected, the analyses, results and interpretation of the pumping tests performed at HSB 84A. It should serve as a good baseline for future studies on the subject of contaminant migration in the Congaree aquifer on the Savannah River Site

  10. Sodium test of the Super-Phenix full size primary pump shaft on the CPV-1 test rig at ENEA-Brasimone

    International Nuclear Information System (INIS)

    Contardi, T.; Rapezzi, L.; Partiti, C.; Zola, M.; Denimal, P.

    1984-01-01

    Tests on FBR Superphenix primary pump shaft were performed within the sodium-cooled FBR common research and development programs provided for by the cooperation agreement between ENEA and CEA. These tests were performed in CPV-1 plant ENEA - Brasimone Energy Research Center. The CPV-1 rig was built by FIAT-TTG and reproduces the reactor operating conditions (sodium-temperature and level, shaft inclination, etc..). Furthermore, CPV-1 rig's most interesting feature is its possibility to apply seismic stresses to test section by means of an oleodynamic actuator. Pivoterie-1 test section was made by JEUMONT-SCHNEIDER which built Superphenix pumps too; it was given to ENEA by FIAT-TTG. Seismic tests were performed with the cooperation of ISMES and FIAT-TTG. (author)

  11. Operation of pumps in two-phase steam-water flow

    International Nuclear Information System (INIS)

    Grison, P.; Lauro, J.F.

    1978-01-01

    Determining the two-phase flow (critical or not) through a pump is an esential element for a complete description of loss of coolant accident in a PWR reactor. This article descibes the theoretical and experimental research being done on this subject in France. The model of the pump is first described and its behaviour is examined in different possible cases, particularly that of critical flow. The analysis of the behaviour of the pump is then used to define the experimental conditions for the tests. Two test loops, EVA and EPOPEE, were built. The experimental results are then compared with the theoretical forecasts [fr

  12. Predictive potential of pre-operative functional neuroimaging in patients treated with subthalamic stimulation

    International Nuclear Information System (INIS)

    Sestini, Stelvio; Castagnoli, Antonio; Pupi, Alberto; Sciagra, Roberto; Ammannati, Franco; Ramat, Silvia; Sorbi, Sandro; Mansi, Luigi

    2010-01-01

    The aim of this study was to investigate the predictive potential of pre-operative regional cerebral blood flow (rCBF) in the pre-supplementary motor area (pre-SMA) and clinical factors in Parkinson's disease (PD) patients treated with subthalamic nucleus (STN) stimulation. Ten patients underwent rCBF SPECT and motor Unified Parkinson's Disease Rating Scale (UPDRS) pre- and post-operatively during stimulation at 5 and 42 months. Statistical parametric mapping (SPM) was used to extract rCBF values in the pre-SMA because it is related with motor improvement. Post-operative outcomes included motor response to stimulation and percent improvement in UPDRS. Pre-operative predictors were explored by correlation test, linear regression and multivariate analyses. Higher pre-operative rCBF in the pre-SMA and younger age were associated with favourable outcomes at 5 and 42 months. Pre-operative rCBF results were significantly associated with baseline clinical factors. This study shows that PD patients with younger age have higher rCBF values in the pre-SMA and better outcome, thus giving the rationale to the hypothesis that STN stimulation could be considered early in the course of disease. (orig.)

  13. Predictive potential of pre-operative functional neuroimaging in patients treated with subthalamic stimulation

    Energy Technology Data Exchange (ETDEWEB)

    Sestini, Stelvio; Castagnoli, Antonio [Ospedale Misericordia e Dolce, Department of Diagnostic Imaging, Nuclear Medicine Unit, Prato (Italy); Pupi, Alberto; Sciagra, Roberto [University of Florence, Department of Clinical Physiopathology, Nuclear Medicine Unit, Florence (Italy); Ammannati, Franco; Ramat, Silvia; Sorbi, Sandro [University of Florence, Department of Neurological and Psychiatric Sciences, Florence (Italy); Mansi, Luigi [University II Naples, Department of Diagnostic Imaging, Nuclear Medicine Unit, Naples (Italy)

    2010-01-15

    The aim of this study was to investigate the predictive potential of pre-operative regional cerebral blood flow (rCBF) in the pre-supplementary motor area (pre-SMA) and clinical factors in Parkinson's disease (PD) patients treated with subthalamic nucleus (STN) stimulation. Ten patients underwent rCBF SPECT and motor Unified Parkinson's Disease Rating Scale (UPDRS) pre- and post-operatively during stimulation at 5 and 42 months. Statistical parametric mapping (SPM) was used to extract rCBF values in the pre-SMA because it is related with motor improvement. Post-operative outcomes included motor response to stimulation and percent improvement in UPDRS. Pre-operative predictors were explored by correlation test, linear regression and multivariate analyses. Higher pre-operative rCBF in the pre-SMA and younger age were associated with favourable outcomes at 5 and 42 months. Pre-operative rCBF results were significantly associated with baseline clinical factors. This study shows that PD patients with younger age have higher rCBF values in the pre-SMA and better outcome, thus giving the rationale to the hypothesis that STN stimulation could be considered early in the course of disease. (orig.)

  14. Pumps and pump facilities. 2. ed.

    International Nuclear Information System (INIS)

    Bohl, W.; Bauerfeind, H.; Gutmann, G.; Leuschner, G.; Matthias, H.B.; Mengele, R.; Neumaier, R.; Vetter, G.; Wagner, W.

    1981-01-01

    This book deals with the common fundamental aspects of liquid pumps and gives an exemplary choice of the most important kinds of pumps. The scientific matter is dealt with by means of practical mathematical examples among other ways of presenting the matter. Survey of contents: Division on main operational data of pumps - pipe characteristics - pump characteristics - suction behaviour of the pumps - projecting and operation of rotary pumps - boiler feed pumps - reactor feed pumps - oscillating positive-displacement pumps - eccentric spiral pumps. (orig./GL) [de

  15. Operability Test Report for 241-T compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1995-02-01

    This Operability Test Report (OTR) documents the results of functional testing performed on the operating parameters of the 241-T-701 Compressed Air System. The System was successfully installed and tested per work package 2W-92-01172

  16. Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

    International Nuclear Information System (INIS)

    Aftanas, B.L.

    1994-01-01

    This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test

  17. Pre-operative evaluation for thorax surgery

    International Nuclear Information System (INIS)

    Silva Luis, Saenz; Morales, Oscar Alberto

    2002-01-01

    A pre-operative analysis of the function of the breathing system is made in the patient that will be taken to thorax surgery. The paper includes risk factors, pre-operative clinical evaluation and of breathing and cardiovascular system

  18. Risk stratification by pre-operative cardiopulmonary exercise testing improves outcomes following elective abdominal aortic aneurysm surgery: a cohort study.

    Science.gov (United States)

    Goodyear, Stephen J; Yow, Heng; Saedon, Mahmud; Shakespeare, Joanna; Hill, Christopher E; Watson, Duncan; Marshall, Colette; Mahmood, Asif; Higman, Daniel; Imray, Christopher He

    2013-05-19

    In 2009, the NHS evidence adoption center and National Institute for Health and Care Excellence (NICE) published a review of the use of endovascular aneurysm repair (EVAR) of abdominal aortic aneurysms (AAAs). They recommended the development of a risk-assessment tool to help identify AAA patients with greater or lesser risk of operative mortality and to contribute to mortality prediction.A low anaerobic threshold (AT), which is a reliable, objective measure of pre-operative cardiorespiratory fitness, as determined by pre-operative cardiopulmonary exercise testing (CPET) is associated with poor surgical outcomes for major abdominal surgery. We aimed to assess the impact of a CPET-based risk-stratification strategy upon perioperative mortality, length of stay and non-operative costs for elective (open and endovascular) infra-renal AAA patients. A retrospective cohort study was undertaken. Pre-operative CPET-based selection for elective surgical intervention was introduced in 2007. An anonymized cohort of 230 consecutive infra-renal AAA patients (2007 to 2011) was studied. A historical control group of 128 consecutive infra-renal AAA patients (2003 to 2007) was identified for comparison.Comparative analysis of demographic and outcome data for CPET-pass (AT ≥ 11 ml/kg/min), CPET-fail (AT 11 ml/kg/min was associated with reduced perioperative mortality (open cases only), LOS, survival and inpatient costs (open and endovascular repair) for elective infra-renal AAA surgery.

  19. Test report - 241-AN-274 Caustic Pump Control Building

    International Nuclear Information System (INIS)

    Paintner, G.P.

    1995-05-01

    This Acceptance Test Report documents the test results of test procedure WHC-SD-WM-ATP-135 'Acceptance Test Procedure for the 241-AN- 274 Caustic Pump Control Building.' The objective of the test was to verify that the 241-AN-274 Caustic Pump Control Building functions properly based on design specifications per applicable H-2-85573 drawings and associated ECN's. The objective of the test was met

  20. Main coolant pump testing at Ontario Hydro

    International Nuclear Information System (INIS)

    Hartlen, R.

    1991-01-01

    This article describes Ontario Hydro Research Division's experience with a computerized data acquisition and analysis system for monitoring mechanical vibration in reactor coolant pumps. The topics covered include bench-marking of the computer system and the coolant pumps, signatures of normal and malfunctioning pumps, analysis of data collected by the monitoring system, simulation of faults, and concerns that have been expressed about data interpretation, sensor types and locations, alarm/shutdown limits and confirmation of nondestructive examination testing. This presentation consists of overheads only

  1. Development of model pump for establishing hydraulic design of primary sodium pumps in PFBR

    International Nuclear Information System (INIS)

    Chougule, R.J.; Sahasrabudhe, H.G.; Rao, A.S.L.K.; Balchander, K.; Kale, R.D.

    1994-01-01

    Indira Gandhi Centre for Atomic Research, Kalpakkam indicated requirement of indigenous development of primary sodium pump, handling liquid sodium as coolant in Fast Breeder Reactor. The primary sodium pump concept selected in its preliminary design is a vertical, single stage, with single suction impeller, suction facing downwards. The pump is having diffuser, discharge casing and discharge collector. The 1/3 rd size model pump is developed to establish the hydraulic performance of the prototype primary sodium pump. The main objectives were to verify the hydraulic design to operate on low net positive suction head available (NPSHA), no evidence of visible cavitation at available NPSHA, the pump should be designed with a diffuser etc. The model pump PSP 250/40 was designed and successfully developed by Research and Development Division of M/s Kirloskar Brothers Ltd., Kirloskarvadi. The performance testing using model pump was successfully carried out on a closed circuit test rig. The performance of a model pump at three different speeds 1900 rpm, 1456 rpm and 975 rpm was established. The values of hydraulic axial thrust with and without balancing holes on impeller at 1900 rpm was measured. Visual cavitation study at 1900 rpm was carried out to establish the NPSH at bubble free operation of the pump. The tested performance of the model pump is converted to the full scale prototype pump. The predicted performance of prototype pump at 700 rpm was found to be meeting fully with the expected duties. (author). 6 figs., 3 tabs

  2. Mitigation of Tank 241-SY-101 by pump mixing: Results of testing phases A and B

    Energy Technology Data Exchange (ETDEWEB)

    Allemann, R.T.; Antoniak, Z.I.; Chvala, W.D.; Friley, J.R.; Gregory, W.B.; Hudson, J.D.; Michener, T.E.; Panisko, F.E.; Stewart, C.W.; Wise, B.M. [Pacific Northwest Lab., Richland, WA (United States); Efferding, L.E.; Fadeff, J.G.; Irwin, J.J.; Kirch, N.W. [Westinghouse Hanford Co., Richland, WA (United States)

    1994-03-01

    A spare mixing pump from the Hanford Grout Program was installed in Hanford double-shell waste Tank 241-SY-101 on July 3, 1993, after being modified to take advantage of waste stratification. It was anticipated that pump mixing would prevent large episodic flammable gas releases that had been occurring about every 100-150 days. A cautious initial test plan, called Phase A, was run to find how the pump and tank would behave in response to very brief and gentle pump operation. No large gas releases were triggered, and the pump performed well except for two incidents of nozzle plugging. On October 21, 1993, the next test series, Phase B, began, and the pump was applied more aggressively to mix the tank contents and mitigate uncontrolled gas releases. Orienting the pump in new directions released large volumes of gas and reduced the waste level to a near-record low. Results of the entire period from pump installation to the end of Phase B on December 17, 1993, are presented in detail in this document. Though long-term effects require further evaluation, we conclude from these data that the jet mixer pump is an effective means of controlling flammable gas release and that it has met the success criteria for mitigation in this tank.

  3. TFTR ultrahigh-vacuum pumping system incorporating mercury diffusion pumps

    International Nuclear Information System (INIS)

    Sink, D.A.; Sniderman, M.

    1976-06-01

    The TFTR vacuum vessel will have a system of four 61 cm diameter mercury diffusion pumps to provide a base pressure in the 10 -8 to 10 -9 Torr range as well as a low impurity level within the vessel. The system, called the Torus Vacuum Pumping System (TVPS), will be employed with the aid of an occasional 250 0 C bakeout in situ as well as periodic applications of aggressive discharge cleaning. The TVPS is an ultrahigh-vacuum (UHV) system using no elastomers as well as being a closed system with respect to tritium or any tritiated gases. The backing system employing approximately 75 all-metal isolation valves is designed with the features of redundancy and flexibility employed in a variety of ways to meet the fundamental requirements and functions enumerated for the TVPS. Since the design, is one which is a modification of the conceptual design of the TVPS, those features which have changed are discussed. Calculations are presented for the major performance parameters anticipated for the TVPS and include conductances, effective pumping speeds, base pressures, operating parameters, getter pump parameters, and calculations of time constants associated with leak checking. Modifications in the vacuum pumping system for the guard regions on the twelve bellows sections are presented so that it is compatible with the main TVPS. The bellows pumping system consists of a mechanical pump unit, a zirconium aluminum getter pump unit and a residual gas analyzer. The control and management of the TVPS is described with particular attention given to providing both manual and automatic control at a local station and at the TFTR Central Control. Such operations as testing, maintenance, leak checking, startup, bakeout, and various other operations are considered in some detail. Various aspects related to normal pulsing, discharge cleaning, non-tritium operations and tritium operations are also taken into consideration. A cost estimate is presented

  4. Design development and testing of a solar PV pump based drip system for orchards

    Energy Technology Data Exchange (ETDEWEB)

    Pande, P.C.; Singh, A.K.; Ansari, S.; Vyas, S.K.; Dave, B.K. [Central Arid Zone Research Inst., Jodhpur (India)

    2003-03-01

    A Solar Photovoltaic (PV) pump operated drip irrigation system has been designed and developed for growing orchards in arid region considering different design parameters like pumps size, water requirements, the diurnal variation in the pressure of the pump due to change in irradiance and pressure compensation in the drippers. The system comprising a PV pump with 900 W{sub p} PV array and 800 W dc motor-pump mono-block, microfilter, main and sub-mains and three open-able low-pressure compensating drippers on each plant was field tested. The emission uniformity was observed to be 92-94% with discharge of 3.8 l/h in the pressure range of 70-100 kPa provided by the pump and thus the system could irrigate some 1 ha area within 2 h. Based on the performance of the PV pump and the drip system, it was inferred that about 5 ha area of orchard could be covered. The projected benefit-cost ratio for growing pomegranate orchards with such a system was evaluated to be above 2 even with the costly PV pump and therefore the system was considered to be an appropriate technology for the development of arid region. (Author)

  5. Investigation the Effects of Operation Methods on Energy Consumption in Agricultural Water Pumping Stations

    Directory of Open Access Journals (Sweden)

    M. DelfanAzari

    2017-01-01

    Full Text Available Introduction: The energy crisis has led the world toward the reduction of energy consumption. More than 70 percent of the energy in agriculture sector is used by pumps. In our country, there is no clear standard and guideline and also no adequate supervision for the design, selection, installation and operation of pumping systems appropriate to the circumstances and needs. Consequently, these systems operate with low efficiency and high losses of energy. While more than 20 percent of the world's electricity is consumed by pumps, average pumping efficiency is less than 40%. So evaluation of pumping stations and providing some solutions to increase efficiency and pumping system’s life time and to reduce energy consumption can be an effective in optimization of energy consumption in the country. The main reasons for the low efficiency of pumping systems comparing to potential efficiency are using unsuitable techniques for flow control, hydraulic and physical changes of pumping system during the time, using pumps or motors with low efficiency and poor maintenance. Normally the amount of flow is not constant over the time in a pumping system and needed flow rate is changed at different times. Designing of pumping system should be responsible for peak requirements as well as it must suggest the suitable flow control method to achieve least energy losses for minimum flow requirements. Also one of the main capabilities to reduce energy consumption in pumping stations is improving the flow control method. Using the flow control valves and bypass line with high energy losses is very common. While the use of variable speed pumps (VSPs that supply water requirement with sufficient pressure and minimum amount of energy, is limited due to lack of awareness of designers and (or high initial costs. Materials and Methods: In this study, the operation of the pumping stations under four scenarios (for discharge control in a drip irrigation system was analyzed

  6. Test bench for operational investigation of photovoltaic pumping systems; Bancada de ensaio para averiguacao operacional de sistemas fotovoltaicos de bombeamento

    Energy Technology Data Exchange (ETDEWEB)

    Brito, Alaan Ubaiara; Fedrizzi, Maria Cristina; Zilles, Roberto [Universidade de Sao Paulo (IEE/USP), SP (Brazil). Inst. de Eletrotecnica e Energia], Emails: alaan@iee.usp.br, fedrizzi@iee.usp.br, zilles@iee.usp.br

    2006-07-01

    From the daily water demand, total head and the daily average irradiation, is possible to determine the size of the PV generator for pumping systems. However, once the equipment is acquired some tests are recommended, specially to verify its performance. One of the most relevant parameters to qualify a pumping system is the daily water delivered (m{sup 3}/day) as a function of daily solar irradiation (Wh/m{sup 2}). Facilities that fit different boundaries conditions, as for example constant total head (m) are not easily available, and just few laboratories have this capability. In this way a simple instrumentation with the capability to determine the daily performance of PV pumping systems is presented. The proposed test tools use a hydraulic circuit with two pumps, one connected to the PV system and the other to the electric grid. The total head is maintained constant by the variable speed drive connected to the grid. (author)

  7. A method for evaluating horizontal well pumping tests.

    Science.gov (United States)

    Langseth, David E; Smyth, Andrew H; May, James

    2004-01-01

    Predicting the future performance of horizontal wells under varying pumping conditions requires estimates of basic aquifer parameters, notably transmissivity and storativity. For vertical wells, there are well-established methods for estimating these parameters, typically based on either the recovery from induced head changes in a well or from the head response in observation wells to pumping in a test well. Comparable aquifer parameter estimation methods for horizontal wells have not been presented in the ground water literature. Formation parameter estimation methods based on measurements of pressure in horizontal wells have been presented in the petroleum industry literature, but these methods have limited applicability for ground water evaluation and are based on pressure measurements in only the horizontal well borehole, rather than in observation wells. This paper presents a simple and versatile method by which pumping test procedures developed for vertical wells can be applied to horizontal well pumping tests. The method presented here uses the principle of superposition to represent the horizontal well as a series of partially penetrating vertical wells. This concept is used to estimate a distance from an observation well at which a vertical well that has the same total pumping rate as the horizontal well will produce the same drawdown as the horizontal well. This equivalent distance may then be associated with an observation well for use in pumping test algorithms and type curves developed for vertical wells. The method is shown to produce good results for confined aquifers and unconfined aquifers in the absence of delayed yield response. For unconfined aquifers, the presence of delayed yield response increases the method error.

  8. Thermomechanical piston pump development

    Science.gov (United States)

    Sabelman, E. E.

    1971-01-01

    A thermally powered reciprocating pump has been devised to replace or augment an electric pump for the transport of temperature-control fluid on the Thermoelectric Outer Planet Spacecraft (TOPS). The thermally powered pump operates cyclically by extracting heat energy from the fluid by means of a vapor-pressure expansion system and by using the heat to perform the mechanical work of pumping. A feasibility test unit has been constructed to provide an output of 7 cu in during a 10- to 100-second cycle. It operates with a fluid input temperature of 200 to 300 F and a heat sink temperature of 0 to 30 F.

  9. Radial-piston pump for drive of test machines

    Science.gov (United States)

    Nizhegorodov, A. I.; Gavrilin, A. N.; Moyzes, B. B.; Cherkasov, A. I.; Zharkevich, O. M.; Zhetessova, G. S.; Savelyeva, N. A.

    2018-01-01

    The article reviews the development of radial-piston pump with phase control and alternating-flow mode for seismic-testing platforms and other test machines. The prospects for use of the developed device are proved. It is noted that the method of frequency modulation with the detection of the natural frequencies is easily realized by using the radial-piston pump. The prospects of further research are given proof.

  10. Operational Experience from LCLS-II Cryomodule Testing

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Renzhuo [Fermilab; Hansen, Benjamin [Fermilab; White, Michael [Fermilab; Hurd, Joseph [Fermilab; Atassi, Omar Al [Fermilab; Bossert, Richard [Fermilab; Pei, Liujin [Fermilab; Klebaner, Arkadiy [Fermilab; Makara, Jerry [Fermilab; Theilacker, Jay [Fermilab; Kaluzny, Joshua [Fermilab; Wu, Genfa [Fermilab; Harms, Elvin [Fermilab

    2017-07-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  11. Operational experience from LCLS-II cryomodule testing

    Science.gov (United States)

    Wang, R.; Hansen, B.; White, M.; Hurd, J.; Atassi, O. Al; Bossert, R.; Pei, L.; Klebaner, A.; Makara, J.; Theilacker, J.; Kaluzny, J.; Wu, G.; Harms, E.

    2017-12-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  12. Investigation of Heat Pump Operation Strategies with Thermal Storage in Heating Conditions

    Directory of Open Access Journals (Sweden)

    Wangsik Jung

    2017-12-01

    Full Text Available A heat pump with thermal storage system is a system that operates a heat pump during nighttime using inexpensive electricity; during this time, the generated thermal energy is stored in a thermal storage tank. The stored thermal energy is used by the heat pump during daytime. Based on a model of a dual latent thermal storage tank and a heat pump, this study conducts control simulations using both conventional and advanced methods for heating in a building. Conventional methods include the thermal storage priority method and the heat pump priority method, while advanced approaches include the region control method and the dynamic programming method. The heating load required for an office building is identified using TRNSYS (Transient system simulation, used for simulations of various control methods. The thermal storage priority method shows a low coefficient of performance (COP, while the heat pump priority method leads to high electricity costs due to the low use of thermal storage. In contrast, electricity costs are lower for the region control method, which operates using the optimal part load ratio of the heat pump, and for dynamic programming, which operates the system by following the minimum cost path. According to simulation results for the winter season, the electricity costs using the dynamic programming method are 17% and 9% lower than those of the heat pump priority and thermal storage priority methods, respectively. The region control method shows results similar to the dynamic programming method with respect to electricity costs. In conclusion, advanced control methods are proven to have advantages over conventional methods in terms of power consumption and electricity costs.

  13. Decant pump assembly and controls qualification testing - test report

    Energy Technology Data Exchange (ETDEWEB)

    Staehr, T.W., Westinghouse Hanford

    1996-05-02

    This report summarizes the results of the qualification testing of the supernate decant pump and controls system to be used for in-tank sludge washing in aging waste tank AZ-101. The test was successful and all components are qualified for installation and use in the tank.

  14. Operating problem of low specific speed pumps operating in closed hydraulic loop

    International Nuclear Information System (INIS)

    Rajput, A.K.

    1979-01-01

    Results of the studies of pressure pulsations caused by the centrifugal pump driving a typical sodium test loop are presented. The method of characteristics has been used for solving the equations of unsteady fluid flow in closed hydraulic loops with various boundary points, important of which are pump, control valve and heater tank (acting hydraulically as surge tank). Mathematical and computational models used for calculations are described. (M.G.B.)

  15. Reactor operations for nuclear pumping of lasers

    Energy Technology Data Exchange (ETDEWEB)

    Beck, G; Cooper, G [University of Illinois (United States)

    1974-07-01

    Experiments involving the measurement of gas parameters that are related to lasing, and lasing of various gas mixtures have comprised a major part of the utilization of the University of Illinois Advanced TRIGA Reactor since the upgrading of the facility was completed in 1969. A thru beam port, which was added during upgrading, has been the facility used for these measurements. The laser cell is placed in the port adjacent to the core. Alignment is then accomplished by using both ends of the port or by a mirror placed at the back side of the apparatus. The reactor has been operated in all modes (pulsing, square wave, and steady state) for the experiments although pulsing is the primary mode that is used. Laser enhancement has been obtained in several cases, but efforts toward direct pumping from the radiation alone have not as yet succeeded. Improved laser operation from direct pumping has been suggested with an emphasis on high-powered systems where the basic input energy is to be derived from a nuclear reactor.

  16. Mixer pump test plan for double shell tank AZ-101

    International Nuclear Information System (INIS)

    STAEHR, T.W.

    1999-01-01

    Mixer pump systems have been chosen as the method for retrieval of tank wastes contained in double shell tanks at Hanford. This document describes the plan for testing and demonstrating the ability of two 300 hp mixer pumps to mobilize waste in tank AZ-101. The mixer pumps, equipment and instrumentation to monitor the test were installed by Project W-151

  17. Inducer pumps for liquid metal reactor plants

    International Nuclear Information System (INIS)

    Jackson, E.D.

    2002-01-01

    Pumps proposed for liquid metal reactor plants typically use centrifugal impellers as the rotating element and are required to maintain a relatively low speed to keep the suction specific speed low enough to operate at the available net positive suction head (HPSH) and to avoid cavitation damage. These low speeds of operation require that the pump diameter increase and/or multiple stages be used to achieve the design head. This frequently results in a large, heavy, complex pump design. In addition, the low speed results in a larger drive motor size so that the resultant penalty to the plant designer is multiplied. The heavier pump can also result in further complications as, e.g., the difficulty in maintaining the first critical speed sufficiently above the pump operating range to provide margin for rotor dynamic stability. To overcome some of these disadvantages, it was proposed the use of inducer pumps for Liquid Metal Fast Breeder Reactor (LMFBR) plants. This paper discusses some of the advantages of the inducer pump and the development history of designing and testing these pumps both in water and sodium. The inducer pump is seen to be a sound concept with a strong technology base derived from the aerospace and ship propulsion industries. The superior suction performance capability of the inducer offers significant system design advantages, primarily a smaller, lighter weight, less complex pump design with resulting saving in cost. Extensive testing of these pumps has been conducted in both sodium and water to demonstrate the long-life capability with no cavitation damage occurring in those designs based on Rockwell's current design criteria. These tests have utilized multiple inspection and measurement approaches to accurately assess and identify any potential for cavitation damage, and these approaches have all concluded that no damage is occurring. Therefore, it is concluded that inducer pumps can be safely designed for long life operation in sodium with

  18. Study on operation of a research reactor during one PCS pump failure accident

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Kyoung Woo; Yoon, Hyu Ngi; Kim, Seong Hoon; Chi, Dae Young; Yoon, Juh Yeon [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    The Primary cooling system (PCS) of a research reactor is designed to provide adequate cooling to the reactor core with a reasonable margin during all operation modes. The PCS consists of pumps, heat exchangers, and all necessary interconnecting pipes, valves, and instruments. The number of pumps is determined from a safety and economic point of view. As the number of pump trains increase, the cost increases according to the increase in safety class equipment. However, it is impossible to install one pump for a PCS because a zero flow can instantaneously occur during a pump failure such as a pump seizure. Thus, a PCS frequently consists of two parallel 50% capacity pumps and heat exchangers. In addition, check valves are generally installed to prevent a reversal flow when multiple pumps are designed to operate. However, if a swing type check valve is used, it should be estimated whether the slam due to instantaneous closing of the valve affects the system vibration. To reduce the vibration by a slam phenomenon, additional equipment such as a damper will be installed in the valve. The purpose of the check valve in PCS is to prevent the flow path when a reverse flow occurs. The installation of additional equipment will make it difficult to perform this function. In this study, it is estimated whether the PCS can operate without check valves. First, a flow analysis using Flowmaster was compared and verified by the calculation employing a empirical correlation. Second, the simulation for a one pump failure accident was performed and analyzed.

  19. Study on operation of a research reactor during one PCS pump failure accident

    International Nuclear Information System (INIS)

    Seo, Kyoung Woo; Yoon, Hyu Ngi; Kim, Seong Hoon; Chi, Dae Young; Yoon, Juh Yeon

    2012-01-01

    The Primary cooling system (PCS) of a research reactor is designed to provide adequate cooling to the reactor core with a reasonable margin during all operation modes. The PCS consists of pumps, heat exchangers, and all necessary interconnecting pipes, valves, and instruments. The number of pumps is determined from a safety and economic point of view. As the number of pump trains increase, the cost increases according to the increase in safety class equipment. However, it is impossible to install one pump for a PCS because a zero flow can instantaneously occur during a pump failure such as a pump seizure. Thus, a PCS frequently consists of two parallel 50% capacity pumps and heat exchangers. In addition, check valves are generally installed to prevent a reversal flow when multiple pumps are designed to operate. However, if a swing type check valve is used, it should be estimated whether the slam due to instantaneous closing of the valve affects the system vibration. To reduce the vibration by a slam phenomenon, additional equipment such as a damper will be installed in the valve. The purpose of the check valve in PCS is to prevent the flow path when a reverse flow occurs. The installation of additional equipment will make it difficult to perform this function. In this study, it is estimated whether the PCS can operate without check valves. First, a flow analysis using Flowmaster was compared and verified by the calculation employing a empirical correlation. Second, the simulation for a one pump failure accident was performed and analyzed

  20. Operation of pumps in two-phase steam-water flow. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    Grison, P; Lauro, J F [Electricite de France, 78 - Chatou

    1978-01-01

    Determining the two-phase flow (critical or not) through a pump is an esential element for a complete description of loss of coolant accident in a PWR reactor. This article descibes the theoretical and experimental research being done on this subject in France. The model of the pump is first described and its behaviour is examined in different possible cases, particularly that of critical flow. The analysis of the behaviour of the pump is then used to define the experimental conditions for the tests. Two test loops, EVA and EPOPEE, were built. The experimental results are then compared with the theoretical forecasts.

  1. TFCX pumped limiter and vacuum pumping system design and analysis

    International Nuclear Information System (INIS)

    Haines, J.R.

    1985-04-01

    Impurity control system design and performance studies were performed in support of the Tokamak Fusion Core Experiment (TFCX) pre-conceptual design. Efforts concentrated on pumped limiter and vacuum pumping system design configuration, thermal/mechanical and erosion lifetime performance of the limiter protective surface, and helium ash removal performance. The reference limiter design forms a continuous toroidal belt at the bottom of the device and features a flat surface with a single leading edge. The vacuum pumping system features large vacuum ducts (diameter approximately 1 m) and high-speed, compound cryopumps. Analysis results indicate that the limiter/vacuum pumping system design provides adequate helium ash removal. Erosion, primarily by disruption-induced vaporization and/or melting, limits the protective surface lifetime to about one calendar year or only about 60 full-power hours of operation. In addition to evaluating impurity control system performance for nominal TFCX conditions, these studies attempt to focus on the key plasma physics and engineering design issues that should be addressed in future research and development programs

  2. Study and development of an air conditioning system operating on a magnetic heat pump cycle (design and testing of flow directors)

    Science.gov (United States)

    Wang, Pao-Lien

    1992-01-01

    This report describes the fabrication, design of flow director, fluid flow direction analysis and testing of flow director of a magnetic heat pump. The objectives of the project are: (1) to fabricate a demonstration magnetic heat pump prototype with flow directors installed; and (2) analysis and testing of flow director and to make sure working fluid loops flow through correct directions with minor mixing. The prototype was fabricated and tested at the Development Testing Laboratory of Kennedy Space Center. The magnetic heat pump uses rear earth metal plates rotate in and out of a magnetic field in a clear plastic housing with water flowing through the rotor plates to provide temperature lift. Obtaining the proper water flow direction has been a problem. Flow directors were installed as flow barriers between separating point of two parallel loops. Function of flow directors were proven to be excellent both analytically and experimentally.

  3. A practical approach for implementing risk-based inservice testing of pumps at nuclear power plants

    International Nuclear Information System (INIS)

    Hartley, R.S.; Maret, D.; Seniuk, P.; Smith, L.

    1996-01-01

    The American Society of Mechanical Engineers (ASME) Center for Research and Technology Development's (CRTD) Research Task Force on Risk-Based Inservice Testing has developed guidelines for risk-based inservice testing (IST) of pumps and valves. These guidelines are intended to help the ASME Operation and Maintenance (OM) Committee to enhance plant safety while focussing appropriate testing resources on critical components. This paper describes a practical approach for implementing those guidelines for pumps at nuclear power plants. The approach, as described in this paper, relies on input, direction, and assistance from several entities such as the ASME Code Committees, United States Nuclear Regulatory Commission (NRC), and the National Laboratories, as well as industry groups and personnel with applicable expertise. Key parts of the risk-based IST process that are addressed here include: identification of important failure modes, identification of significant failure causes, assessing the effectiveness of testing and maintenance activities, development of alternative testing and maintenance strategies, and assessing the effectiveness of alternative testing strategies with present ASME Code requirements. Finally, the paper suggests a method of implementing this process into the ASME OM Code for pump testing

  4. A practical approach for implementing risk-based inservice testing of pumps at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, R.S. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Maret, D.; Seniuk, P.; Smith, L.

    1996-12-01

    The American Society of Mechanical Engineers (ASME) Center for Research and Technology Development`s (CRTD) Research Task Force on Risk-Based Inservice Testing has developed guidelines for risk-based inservice testing (IST) of pumps and valves. These guidelines are intended to help the ASME Operation and Maintenance (OM) Committee to enhance plant safety while focussing appropriate testing resources on critical components. This paper describes a practical approach for implementing those guidelines for pumps at nuclear power plants. The approach, as described in this paper, relies on input, direction, and assistance from several entities such as the ASME Code Committees, United States Nuclear Regulatory Commission (NRC), and the National Laboratories, as well as industry groups and personnel with applicable expertise. Key parts of the risk-based IST process that are addressed here include: identification of important failure modes, identification of significant failure causes, assessing the effectiveness of testing and maintenance activities, development of alternative testing and maintenance strategies, and assessing the effectiveness of alternative testing strategies with present ASME Code requirements. Finally, the paper suggests a method of implementing this process into the ASME OM Code for pump testing.

  5. Active magnetic bearings: As applied to centrifugal pumps

    Science.gov (United States)

    Nelik, Lev; Cooper, Paul; Jones, Graham; Galecki, Dennis; Pinckney, Frank; Kirk, Gordon

    1992-05-01

    Application of magnetic bearings to boiler feed pumps presents various attractive features, such as longer bearing life, lower maintenance costs, and improved operability through control of the rotordynamics. Magnetic bearings were fitted to an eight-stage, 600 hp boiler feed pump, which generates 2600 ft of heat at 680 gpm and 3560 rpm. In addition to the varied and severe operating environment in steady state operation of this pump in a power plant, it is also subjected to transient loads during frequent starts and stops. These loads can now be measured by the in-built instrumentation of the magnetic bearings. Following site installation, a follow-up bearing tune-up was performed, and pump transient response testing was conducted. The bearing response was completely satisfactory, ensuring trouble-free pump operation even in the range of reduced load. The experience gained so far through design and testing proves feasibility of magnetic bearings for boiler feed pumps, which sets the stage for application of even higher energy centrifugal pumps equipped with magnetic bearings.

  6. Process pump operating problems and equipment failures, F-Canyon Reprocessing Facility, Savannah River Plant

    International Nuclear Information System (INIS)

    Durant, W.S.; Starks, J.B.; Galloway, W.D.

    1987-02-01

    A compilation of operating problems and equipment failures associated with the process pumps in the Savannah River Plant F-Canyon Fuel Reprocessing Facility is presented. These data have been collected over the 30-year operation of the facility. An analysis of the failure rates of the pumps is also presented. A brief description of the pumps and the data bank from which the information was sorted is also included

  7. Pre-operative pain and sensory function in groin hernia

    DEFF Research Database (Denmark)

    Aasvang, Eske K; Hansen, Jeanette B; Kehlet, Henrik

    2009-01-01

    (rho=-0.413, p=0.049), indicating a paradoxical association between level of mechanical pain threshold and magnitude of spontaneous pain. No other sensory modality was significantly correlated to pain intensity. New/increased pain during repetitive pinprick stimulation (wind-up) was seen in 3 patients...... mechanism. AIMS: To investigate the correlation between pre-operative pain intensity and sensory functions in the groin hernia area. METHODS: Patients with unilateral groin hernia were examined preoperatively by quantitative sensory testing (thermal, mechanical, and pressure [detection and pain thresholds...... pain is not related to findings of hyperalgesia or other changes in sensory function that may support pain-induced pre-operative neuroplasticity as a pathogenic mechanism for the development of persistent postherniotomy pain....

  8. Pumping and recovery test analysis of groundwater Well in Martajasah, Bangkalan, Madura

    International Nuclear Information System (INIS)

    Adi Gunawan Muhammad

    2010-01-01

    Martajasah is one of the villages in Bangkalan Region, Madura, which have difficulty of fresh water. This area has a lot of potential that can be developed, particularly the potential of religious tourism. To increase the utilization potential of the region and support the public healthy, in 2007 PPGN - BATAN cooperated with the Government of Bangkalan has made one (I) exploration/production groundwater - wells with the expectation it can meet a demand of fresh water in the Martajasah Village area. To determine the capacity of the wells, the maximum discharge pumping and the optimum discharge pumping from the wells pumping test it is necessary should be conducted, which includes step draw down pumping test, constant rate pumping test and recovery test. The purpose of this activity is to determine amount of well loss, loss of aquifer, well hydraulics equations and the value of the efficiency of wells to determine the optimum and maximum discharge wells and calculate the value of transmissivity / transmissivity (T) from the aquifer. The scope of these activities include the preparation of working equipment, testing of all equipment, measurement of static groundwater table, pumping test, and analysis of pumping test. Based on the result from step draw down test, well hydraulics equations obtained Sw = 0.0079 Q + 0.000003 Q 2 , so that according to the well hydraulics equations are than obtained a maximum pumping discharge (Q max ) = 3.9 liters / second (336.7 m 3 ) / days) with the well efficiency (E) = 89%, so the optimum pumping discharge (Q opt )=3.455 liters / second = 298.52 m 3 /day. Based on the result from constant rate pumping test and recovery test showed adequate transmissivity of wells, i e T = 136.5 m 2 / day = 5.6875 m 2 / hour = 0.094 m 2 /minute. (author)

  9. Discussion on joint operation of wind farm and pumped-storage hydroplant

    Science.gov (United States)

    Li, Caifang; Wu, Yichun; Liang, Hao; Li, Miao

    2017-12-01

    Due to the random fluctuations in wind power, large amounts of grid integration will have a negative impact on grid operation and the consumers. The joint operation with pumped-storage hydroplant with good peak shaving performance can effectively reduce the negative impact on the safety and economic operation of power grid, and improve the utilization of wind power. In addition, joint operation can achieve the optimization of green power and improve the comprehensive economic benefits. Actually, the rational profit distribution of joint operation is the premise of sustainable and stable cooperation. This paper focuses on the profit distribution of joint operation, and applies improved shapely value method, which taking the investments and the contributions of each participant in the cooperation into account, to determine the profit distribution. Moreover, the distribution scheme can provide an effective reference for the actual joint operation of wind farm and pumped-storage hydroplant.

  10. A short-term rating method for heat pump heating systems; phase 5: test of the fault diagnosis systems; Kurztestmethode fuer Waermepumpenanlagen; Phase 5: Test der Fehlerdiagnosesysteme

    Energy Technology Data Exchange (ETDEWEB)

    Zogg, D.; Esfandiar, S.

    2001-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) describes the testing phase of a project that developed systems for the operational monitoring and optimisation of heat pump installations along with a diagnosis system for faults. The heat pump is considered as a sub-system. The report describes two monitoring systems and a simulation model that are used to monitor the state of the heat pump both during commissioning as well as during operation. The aim is also to detect faults as early as possible during the whole of the operational life of the installation. A state-orientated approach is propagated as being cheaper than fixed service intervals or repairing after breakdown and standstill. The development of the two monitoring systems called 'HeatWatch' and 'FuzzyWatch' is described. The effort needed for the parametrisation and training of these systems is discussed. The testing of the systems on two test beds using real-life measured values for a single-family home and further simulation data is described and the results listed. The authors state that the monitoring systems can also be used for refrigeration and air-conditioning systems.

  11. Theoretical Model for the Performance of Liquid Ring Pump Based on the Actual Operating Cycle

    Directory of Open Access Journals (Sweden)

    Si Huang

    2017-01-01

    Full Text Available Liquid ring pump is widely applied in many industry fields due to the advantages of isothermal compression process, simple structure, and liquid-sealing. Based on the actual operating cycle of “suction-compression-discharge-expansion,” a universal theoretical model for performance of liquid ring pump was established in this study, to solve the problem that the theoretical models deviated from the actual performance in operating cycle. With the major geometric parameters and operating conditions of a liquid ring pump, the performance parameters such as the actual capacity for suction and discharge, shaft power, and global efficiency can be conveniently predicted by the proposed theoretical model, without the limitation of empiric range, performance data, or the detailed 3D geometry of pumps. The proposed theoretical model was verified by experimental performances of liquid ring pumps and could provide a feasible tool for the application of liquid ring pump.

  12. Efficient high power operation of erbium 3 µm fibre laser diode-pumped at 975 nm

    NARCIS (Netherlands)

    Jackson, S.D.; King, T.A.; Pollnau, Markus

    2000-01-01

    Efficient CW operation of a 2.71 um Er,Pr:ZBLAN double-clad fibre laser pumped with a single diode laser operating at a wavelength of 975 nm is described. A maximum output power of 0.5 W and a slope efficiency of 25% (with respect to the launched pump power) were obtained. Threshold pump powers of <

  13. Measurements on a PV solar pump equipped with a piston pump with a matching valve

    NARCIS (Netherlands)

    Smulders, P.T.; Ten Thije O.G. Boonkkamp, J.; Borg, van der N.J.C.M.; Beek, van M.

    1997-01-01

    The work on a simple high efficient solar pump equipped with a piston pump with a matching valve, reported at the Solar World Congress in Budapest, has been continued. Quasi-static and dynamic models of the solar pump have been derived with which the operation of the system is simulated. A test rig

  14. The progressing cavity pump operating envelope : you cannot expand what you don't understand

    Energy Technology Data Exchange (ETDEWEB)

    Noonan, S.G. [ConocoPhillips Co., Houston, TX (United States)

    2008-10-15

    For years, the preferred method of lift for cold heavy oil production has been progressing cavity pumps (PCP) but their use has resulted in many misapplications and poor performance. Testing programs have since emerged to understand the science behind PCP performance under different conditions. This paper described some of the recent findings from these test programs in order to assist in selecting and designing a PCP system for heavy oil, including understanding gas handling capabilities, rod string torsion, elastomer swell, metallic stators, and the effects of speed and rotor-stator fit on PCP run life. The paper also described the efforts of a group of operating companies to standardize nomenclature and data parameters in order to facilitate analysis and benchmarking to identify areas for improvement and gaps for technology advancement. Information from a group of PCP users and manufacturers that created comprehensive international standards in 2006 and recommended practices for the manufacturing and testing of these pumping systems were also provided. It was concluded that much is still needed to be understood in understanding PCP performance, especially drive string dynamics, pump pressure capability, and PCP system reliability. 18 refs., 2 figs.

  15. Operator modeling of a loss-of-pumping accident using MicroSAINT

    International Nuclear Information System (INIS)

    Olsen, L.M.

    1992-01-01

    The Savannah River Laboratory (SRL) human factors group has been developing methods for analyzing nuclear reactor operator actions during hypothetical design-basis accident scenarios. The SRL reactors operate at a lower temperature and pressure than power reactors resulting in accident sequences that differ from those of power reactors. Current methodology development is focused on modeling control room operator response times dictated by system event times specified in the Savannah River Site Reactor Safety Analysis Report (SAR). The modeling methods must be flexible enough to incorporate changes to hardware, procedures, or postulated system event times and permit timely evaluation. The initial model developed was for the loss-of-pumping accident (LOPA) because a significant number of operator actions are required to respond to this postulated event. Human factors engineers had been researching and testing a network modeling simulation language called MicroSAINT to simulate operators' personal and interpersonal actions relative to operating system events. The LOPA operator modeling project demonstrated the versatility and flexibility of MicroSAINT for modeling control room crew interactions

  16. 241-SY-101 mixer pump lifetime expectancy. Final report

    International Nuclear Information System (INIS)

    Shaw, C.P.

    1995-01-01

    The purpose of WHC-SD-WM-TI-726, Rev. 0 241-SY-101 Mixer Pump Lifetime Expectancy is to determine a best estimate of the mean lifetime of non-repairable (located in the waste) essential features of the hydrogen mitigation mixer pump presently installed in 101-SY. The estimated mean lifetime is 9.1 years. This report does not demonstrate operation of the entire pump assembly within the Tank Farm ''safety envelope''. It was recognized by the Defense Nuclear Facilities Safety Board (DNFSB) this test pump was not specifically designed for long term service in tank 101-SY. In June 95 the DNFSB visited Hanford and ask the question, ''how long will this test pump last and how will the essential features fail?'' During the 2 day meeting with the DNFSB it was discussed and defined within the meeting just exactly what essential features of the pump must operate. These essential features would allow the pump to operate for the purpose of extending the window for replacement. Operating with only essential features would definitely be outside the operating safety envelope and would require a waiver. There are three essential features: 1. The pump itself (i.e. the impeller and motor) must operate 2. Nozzles and discharges leg must remain unplugged 3. The pump can be re-aimed, new waste targeted, even if manually

  17. Dual wavelength operation in diode-end-pumped hybrid vanadate ...

    Indian Academy of Sciences (India)

    Dual wavelength operation at 1062.8 nm and 1064.1 nm in a diode-pumped hybrid laser comprising of Nd3+-doped birefringent YVO4 and GdVO4 crystals is demon-strated. A detailed characterization of the laser is performed under CW and pulsed operation. Under Q-switching, 4 W of average power at 5 kHz repetition ...

  18. Tests of dry mechanical forepumps for use in the ITER vacuum pumping system

    International Nuclear Information System (INIS)

    Kirchhof, U.; Kammerer, B.; Perinic, D.

    1995-04-01

    This report is a description of the design and construction of FORTE (Forepumps Test Facility) which has been built in order to enable testing of the pumping speeds of prototypical mechanical forepumps connected in series, as proposed for the ITER forepump system. Three NORMETEX pumps (1300, 600, 60 m 3 /h) and one METAL BELLOWS pump (6m 3 /h) have been integrated into the test bench. Measurements of the pumping characteristics were performed, both with the single pumps and with trains of series connected pumps, using the gases N 2 , H 2 , D 2 , He as well as ITER typical gas mixture. The results of the tests are presented. (orig.)

  19. Evaluation of personal air sampling pumps

    International Nuclear Information System (INIS)

    Ritter, P.D.; Novick, V.J.; Alvarez, J.L.; Huntsman, B.L.

    1987-01-01

    Personal air samplers are used to more conveniently obtain breathing zone samples from individuals over periods of several hours. Personal air sampling pumps must meet minimum performance levels under all working conditions to be suitable for use in radiation protection programs. In addition, the pumps should be simple to operate and as comfortable to wear as possible. Ten models of personal air sampling pumps were tested to evaluate their mechanical performance and physical characteristics. The pumps varied over a wide range in basic performance and operating features. Some of the pumps were found to have adequate performance for use in health physics air sampling applications. 3 references, 2 figures, 5 tables

  20. Pumping tests in nonuniform aquifers - The radially symmetric case

    Science.gov (United States)

    Butler, J.J.

    1988-01-01

    Traditionally, pumping-test-analysis methodology has been limited to applications involving aquifers whose properties are assumed uniform in space. This work attempts to assess the applicability of analytical methodology to a broader class of units with spatially varying properties. An examination of flow behavior in a simple configuration consisting of pumping from the center of a circular disk embedded in a matrix of differing properties is the basis for this investigation. A solution describing flow in this configuration is obtained through Laplace-transform techniques using analytical and numerical inversion schemes. Approaches for the calculation of flow properties in conditions that can be roughly represented by this simple configuration are proposed. Possible applications include a wide variety of geologic structures, as well as the case of a well skin resulting from drilling or development. Of more importance than the specifics of these techniques for analysis of water-level responses is the insight into flow behavior during a pumping test that is provided by the large-time form of the derived solution. The solution reveals that drawdown during a pumping test can be considered to consist of two components that are dependent and independent of near-well properties, respectively. Such an interpretation of pumping-test drawdown allows some general conclusions to be drawn concerning the relationship between parameters calculated using analytical approaches based on curve-matching and those calculated using approaches based on the slope of a semilog straight line plot. The infinite-series truncation that underlies the semilog analytical approaches is shown to remove further contributions of near-well material to total drawdown. In addition, the semilog distance-drawdown approach is shown to yield an expression that is equivalent to the Thiem equation. These results allow some general recommendations to be made concerning observation-well placement for pumping

  1. Fabrication of an electromagnetic pump with gas circulation

    International Nuclear Information System (INIS)

    Ravoire, J.

    1959-01-01

    This note reports the design and production of a pump aimed at circulating a gas in a closed circuit, and possessing some specific properties (tightness, gas in contact only with glass, operation pressure range, rates, resistance to overpressure). After a description of pump operation principle, the author describes the glassware part of the pump, its electromagnetic and electronic parts. He reports tests performed to assess pump characteristics. Obtained data are graphically presented, as well as a drawing of the pump

  2. Pre-operative and early post-operative factors associated with surgical site infection after laparoscopic sleeve gastrectomy.

    Science.gov (United States)

    Ruiz-Tovar, Jaime; Oller, Inmaculada; Llavero, Carolina; Arroyo, Antonio; Muñoz, Jose Luis; Calero, Alicia; Diez, María; Zubiaga, Lorea; Calpena, Rafael

    2013-08-01

    Surgical procedures on obese patients are expected to have a high incidence of surgical site infection (SSI). The identification of pre-operative or early post-operative risk factors for SSI may help the surgeon to identify subjects in risk and adequately optimize their status. We conducted a study of the association of comorbidities and pre- and post-operative analytical variables with SSI following laparoscopic sleeve gastrectomy for the treatment of morbid obesity. We performed a prospective study of all morbidly obese patients undergoing laparoscopic sleeve gastrectomy as a bariatric procedure between 2007 and 2011. An association of clinical and analytical variables with SSI was investigated. The study included 40 patients with a mean pre-operative body mass index (BMI) of 51.2±7.9 kg/m(2). Surgical site infections appeared in three patients (7.5%), of whom two had an intra-abdominal abscess located in the left hypochondrium and the third had a superficial incisional SSI. Pre-operatively, a BMI >45 kg/m(2) (OR 8.7; p=0.008), restrictive disorders identified by pulmonary function tests (OR 10.0; p=0.012), a serum total protein concentration 30 mcg/dL (OR 13.0; p=0.003), and a mean corpuscular volume (MCV) operative SSI. Post-operatively, a serum glucose >128 mg/dL (OR 4.7; p=0.012) and hemoglobin operative anemia and hyperglycemia as risk factors for SSI. In these situations, the surgeon must be aware of and seek to control these risk factors.

  3. The design and testing of sodium pumps in the UK to meet the CDFR cavitation criteria

    International Nuclear Information System (INIS)

    Preece, G.E.; Macleod, I.D.; Wilkinson, D.

    2002-01-01

    A primary objective in the design of the sodium pumps for the UK Commercial Demonstration Fast Reactor has been to avoid cavitation during normal operation. This requirement arises from the need to avoid blade erosion and also, in the case of the Primary Sodium Pumps (PSP), the generation of cavitation noise which might otherwise interfere with instrumentation installed to detect noise of boiling in the core. This paper outlines the approach adopted to achieve a pump design with good cavitation performance and the programme of model testing carried out in a water loop to establish the cavitation boundaries for incipient cavitation of selected designs using both visual and acoustic techniques

  4. The Phillips Laboratory capillary pumped loop test facility

    Science.gov (United States)

    Gluck, Donald F.; Kaylor, Marc C.

    1996-03-01

    An ammonia capillary pumped loop (CPL) test facility has been designed, fabricated, subject to acceptance tests, and assembled at Phillips Laboratory. Its intent is to support a wide range of Air Force programs, bringing CPL technology to flight readiness for operational systems. The facility provides a high degree of modularity and flexibility with several heating and cooling options, and capability for elevation (+/- 15 in.), tilt (+/-60°) and transport length variation. It has a 182 by 44 by 84 inch envelope, an expected heat load capability of 2500 W, and a temperature range of 0 to 50 °C. The evaporator section has two plates with four capillary pumps (CPs) each, with a starter pump on one plate. The CPs are 5/8 in., with TAG aluminum 6063-T6 casing and UHMW polyethylene wicks. The active lengths are 15 and 30 inch with both 10 and 15 micron wicks. The individual CPs have thermal and hydraulic isolation capability, and are removable. The transport section consists of stainless steel lines in a serpentine configuration, a 216 in3 free volume reservoir, and a mechanical pump. The vapor transport line contains a capillary device (which can be bypassed) for vapor blockage during startup. The condenser consists of two separately valved, parallel cold plates each with a downstream noncondensible gas trap. Cooling of up to 1500 W at -50 °C is provided by an FTS Systems chiller using Flourinert FC-72. An enclosure/exhaust system is provided for safety and emergency venting of ammonia. An ammonia charge station performs or supports the functions of proof pressure, flushing with ammonia, purging with gaseous nitrogen, evacuation of all or part of the CPL to 20 microns, and charging. Instrumentation consists of over 116 thermocouples, five of which are internal; one absolute and six differential pressure transducers; eleven watt transducers, and a reservoir load cell. The data acquisition system consists of a temperature scanner, Bernoulli drive, and two Macintosh

  5. Water Flow Testing and Unsteady Pressure Analysis of a Two-Bladed Liquid Oxidizer Pump Inducer

    Science.gov (United States)

    Schwarz, Jordan B.; Mulder, Andrew; Zoladz, Thomas

    2011-01-01

    test scale. The amplitude and frequency of oscillations varied considerably over the pump s operating space, making it difficult to predict blade loads.

  6. Careful system design. Current interim results of the heat pump field test; Das Gesamtsystem sorgfaeltig auslegen. Aktuelle Zwischenergebnisse im Waermepumpen-Feldtest

    Energy Technology Data Exchange (ETDEWEB)

    Miara, Marek [Fraunhofer-Institut fuer Solare Energiesysteme ISE, Freiburg (Germany)

    2008-09-15

    How efficient are modern electric heat pumps for newly constructed single-family dwellings? This question is to be answered by the project ''Waermepumpen-Effizienz'' (heat pump efficiency), a scientific field test that started in the summer of 2006. The contribution presents first results, including the measured performance data. Further, factors were identified that interfere with the optimum operation of heat pumps. (orig.)

  7. Heat pumps in field test; Waermepumpen im Feldtest

    Energy Technology Data Exchange (ETDEWEB)

    Becker, R. [Fraunhofer-Institut fuer Solare Energiesysteme (ISE), Freiburg im Breisgau (Germany); Miara, M.; Russ, C.

    2007-09-15

    The Fraunhofer ISE has launched two field tests of newly installed heat pumps in 2006. Both deal with the measurement of a high number of heat pump units under real conditions in small houses. Values of volume flows, temperatures, heat quantity and electricity consumption are collected and daily saved and analysed at the Fraunhofer ISE. (orig.)

  8. Considerations for reference pump curves

    International Nuclear Information System (INIS)

    Stockton, N.B.

    1992-01-01

    This paper examines problems associated with inservice testing (IST) of pumps to assess their hydraulic performance using reference pump curves to establish acceptance criteria. Safety-related pumps at nuclear power plants are tested under the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (the Code), Section 11. The Code requires testing pumps at specific reference points of differential pressure or flow rate that can be readily duplicated during subsequent tests. There are many cases where test conditions cannot be duplicated. For some pumps, such as service water or component cooling pumps, the flow rate at any time depends on plant conditions and the arrangement of multiple independent and constantly changing loads. System conditions cannot be controlled to duplicate a specific reference value. In these cases, utilities frequently request to use pump curves for comparison of test data for acceptance. There is no prescribed method for developing a pump reference curve. The methods vary and may yield substantially different results. Some results are conservative when compared to the Code requirements; some are not. The errors associated with different curve testing techniques should be understood and controlled within reasonable bounds. Manufacturer's pump curves, in general, are not sufficiently accurate to use as reference pump curves for IST. Testing using reference curves generated with polynomial least squares fits over limited ranges of pump operation, cubic spline interpolation, or cubic spline least squares fits can provide a measure of pump hydraulic performance that is at least as accurate as the Code required method. Regardless of the test method, error can be reduced by using more accurate instruments, by correcting for systematic errors, by increasing the number of data points, and by taking repetitive measurements at each data point

  9. External gear pumps operating with non-Newtonian fluids: Modelling and experimental validation

    Science.gov (United States)

    Rituraj, Fnu; Vacca, Andrea

    2018-06-01

    External Gear Pumps are used in various industries to pump non-Newtonian viscoelastic fluids like plastics, paints, inks, etc. For both design and analysis purposes, it is often a matter of interest to understand the features of the displacing action realized by meshing of the gears and the description of the behavior of the leakages for this kind of pumps. However, very limited work can be found in literature about methodologies suitable to model such phenomena. This article describes the technique of modelling external gear pumps that operate with non-Newtonian fluids. In particular, it explains how the displacing action of the unit can be modelled using a lumped parameter approach which involves dividing fluid domain into several control volumes and internal flow connections. This work is built upon the HYGESim simulation tool, conceived by the authors' research team in the last decade, which is for the first time extended for the simulation of non-Newtonian fluids. The article also describes several comparisons between simulation results and experimental data obtained from numerous experiments performed for validation of the presented methodology. Finally, operation of external gear pump with fluids having different viscosity characteristics is discussed.

  10. Lunar Base Heat Pump

    Science.gov (United States)

    Walker, D.; Fischbach, D.; Tetreault, R.

    1996-01-01

    The objective of this project was to investigate the feasibility of constructing a heat pump suitable for use as a heat rejection device in applications such as a lunar base. In this situation, direct heat rejection through the use of radiators is not possible at a temperature suitable for lde support systems. Initial analysis of a heat pump of this type called for a temperature lift of approximately 378 deg. K, which is considerably higher than is commonly called for in HVAC and refrigeration applications where heat pumps are most often employed. Also because of the variation of the rejection temperature (from 100 to 381 deg. K), extreme flexibility in the configuration and operation of the heat pump is required. A three-stage compression cycle using a refrigerant such as CFC-11 or HCFC-123 was formulated with operation possible with one, two or three stages of compression. Also, to meet the redundancy requirements, compression was divided up over multiple compressors in each stage. A control scheme was devised that allowed these multiple compressors to be operated as required so that the heat pump could perform with variable heat loads and rejection conditions. A prototype heat pump was designed and constructed to investigate the key elements of the high-lift heat pump concept. Control software was written and implemented in the prototype to allow fully automatic operation. The heat pump was capable of operation over a wide range of rejection temperatures and cooling loads, while maintaining cooling water temperature well within the required specification of 40 deg. C +/- 1.7 deg. C. This performance was verified through testing.

  11. Pre-operative high sensitive C-reactive protein predicts cardiovascular events after coronary artery bypass grafting surgery: A prospective observational study

    Directory of Open Access Journals (Sweden)

    Balciunas Mindaugas

    2009-01-01

    Full Text Available C-reactive protein is a powerful independent predictor of cardiovascular events in patients with coronary artery disease. The relation between C-reactive protein (CRP concentration and in-hospital outcome, after coronary artery bypass grafting (CABG, has not yet been established. The study aims to evaluate the predictive value of pre-operative CRP for in-hospital cardiovascular events after CABG surgery. High-sensitivity CRP (hs-CRP levels were measured pre-operatively on the day of surgery in 66 patients scheduled for elective on pump CABG surgery. Post-operative cardiovascular events such as death from cardiovascular causes, ischemic stroke, myocardial damage, myocardial infarction and low output heart failure were recorded. During the first 30 days after surgery, 54 patients were free from observed events and 14 developed the following cardiovascular events: 10 (15% had myocardial damage, four (6% had low output heart failure and two (3% suffered stroke. No patients died during the follow-up period. Serum concentration of hs-CRP ≥ 3.3 mg/l (cut-off point obtained by ROC analysis was related to higher risk of post-operative cardiovascular events (36% vs 6%, P = 0.01, myocardial damage (24% vs 6%, P = 0.04 and low output heart failure (12% vs 0%, P = 0.04. Multivariate logistic regression analysis showed that hs-CRP ≥ 3.3 mg/l ( P = 0.002, O.R.: 19.3 (95% confidence interval (CI 2.9-128.0, intra-operative transfusion of red blood cells ( P = 0.04, O.R.: 9.9 (95% C.I. 1.1-85.5 and absence of diuretics in daily antihypertensive treatment ( P = 0.02, O.R.: 15.1 (95% C.I. 1.4-160.6 were independent predictors of combined cardiovascular event. Patients having hs-CRP value greater or equal to 3.3 mg/l pre-operatively have an increased risk of post-operative cardiovascular events after on pump coronary artery bypass grafting surgery.

  12. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  13. [Pre-operation evaluation and intra-operation management of cochlear implantation].

    Science.gov (United States)

    Zhang, Dao-xing; Hu, Bao-hua; Xiao, Yu-li; Shi, Bo-ning

    2004-10-01

    To summarize pre-operation evaluation experiences in cochlear implantation. Performing auditory evaluation and image analysis seriously in 158 severe hearing loss or total deaf cases before cochlear implantation, comparing their performance with the findings during and post operation. Among the total 158 cases, 116 cases with normal structure, 42 cases with the abnormal findings of the inner or middle ear. Stapedial gusher happened in 6 cases, 1 case was not predicted before operation. Except 1 case with serious malformation, the findings of other 157 cases in operation were consistent with the pre-operation evaluation. We helped all patients reconstruct auditory conduction with cochlear implantation, and the average hearing level up to 37.6 dB SPL. Performing image analysis seriously before operation and planning for operation according to HRCT can do great help to cochlear implantation. The operation under the HRCT instruction has less complications.

  14. Test specification for decant pump and winch assembly. Revision 2

    International Nuclear Information System (INIS)

    Staehr, T.W.

    1995-01-01

    This specification provides the requirements for testing of the vertical turbine decant pump including the floating suction with load sensing winch control, instrumentation and the associated PLC/PC control system. All assembly necessary for testing including piping, temporary wiring, etc., shall be performed by the Seller. All referenced figures are at the back of this document. The testing consists of performance testing, winch testing and calibration, instrumentation verification testing and run-in testing of the pump. Testing shall be done in the presence and under the direction of the Buyer in accordance with this procedure

  15. Influence of individual heat pumps on wind power integration – Energy system investments and operation

    International Nuclear Information System (INIS)

    Hedegaard, Karsten; Münster, Marie

    2013-01-01

    Highlights: • Individual heat pumps can significantly support the integration of wind power. • The heat pumps significantly reduce fuel consumption, CO 2 emissions, and costs. • Heat storages for the heat pumps can provide only moderate system benefits. • Main benefit of flexible heat pump operation is a lower peak/reserve capacity need. • Socio-economic feasibility only identified for some heat storages to some extent. - Abstract: Individual heat pumps are expected to constitute a significant electricity demand in future energy systems. This demand becomes flexible if investing in complementing heat storage capabilities. In this study, we analyse how the heat pumps can influence the integration of wind power by applying an energy system model that optimises both investments and operation, and covers various heat storage options. The Danish energy system by 2030 with around 50–60% wind power is used as a case study. Results show that the heat pumps, even without flexible operation, can contribute significantly to facilitating larger wind power investments and reducing system costs, fuel consumption, and CO 2 emissions. Investments in heat storages can provide only moderate system benefits in these respects. The main benefit of the flexible heat pump operation is a reduced need for peak/reserve capacity, which is also crucial for the feasibility of the heat storages. Socio-economic feasibility is identified for control equipment enabling intelligent heat storage in the building structure and in existing hot water tanks. In contrast, investments in new heat accumulation tanks are not found competitive

  16. Experience in maintenance of pumps in test facilities at R.E.D., B.A.R.C. [Paper No.: II-5

    International Nuclear Information System (INIS)

    Nangia, H.V.; Soni, K.L.; Kamath, K.V.; Mahajan, S.C.

    1981-01-01

    Centrifugal pumps are used for circulating water in various test facilities which are meant for testing reactor components. Operating pressures are about 85 bars at 250 degC. Reciprocating pumps are used for make up service at pressures upto 160 bars. A primary heat transport pump for 200 MWe Candu type reactor, is being tested for checking its performance and for collection of base data. The following are discussed: (i) failure of hydrostatic seal and hydrostatic bearing and its causes, (ii) subsequent repairs and reconditioning, (iii) steps taken to avoid repetition of such failures, and (iv) problems in assembly. For a pump used in the fuelling machine test facility, following maintenance problems are discussed: (1) failure of various components like bearings, mechanical, seals, wear rings, etc., (2) causes of failure and steps taken to remedy the deficiencies noted, (3) experience with the indigenous antifriction bearings, and (4) experience with indigenous spiral wound gaskets. For the reciprocating pumps, leakage through gland packing is a problem. Experience with various types of packing and other parameters, affecting leakage are discussed. (author)

  17. Acceptance for Beneficial Use Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This is a final Acceptance for Beneficial Use (ABU) for Pumping and Instrumentation Control (PIC) skid ''N''. PIC skid ''N'' is ready for pumping tank U-109. All the testing and documentation has been completed as required on the AE3U checklist. This AE3U covers only the readiness of the PIC skid ''N''. Other U-farm preparations including dilution tank fabrication, portable exhauster readiness, leak detection, valve pit preparation, and the Operation Control Station readiness are not part of this ABU. PIC skid ''N'' is a new skid fabricated and tested at Site Fabrication Services. The skid controls the jet pump and monitors various instruments associated with the pumping operation. This monitoring includes leak detection along the waste transfer route and flammable gases in the pump pit. This Acceptance for Beneficial Use documents that Pumping Instrumentation and Control (PIC) skid ''N'' is ready for field use. This document does not cover the field installation or operational testing

  18. Proceedings of the Third NRC/ASME Symposium on Valve and Pump Testing. Session 1A--Session 2C: Volume 1

    International Nuclear Information System (INIS)

    1994-07-01

    The 1994 Symposium on Valve and Pump Testing, jointly sponsored by the Board of Nuclear Codes and Standards of the American Society of Mechanical Engineers and by the Nuclear Regulatory Commission, provides a forum for the discussion of current programs and methods for inservice testing and motor-operated valve testing at nuclear power plants. The symposium also provides an opportunity to discuss the need to improve that testing in order to help ensure the reliable performance of pumps and valves. The participation of industry representatives, regulators, and consultants results in the discussion of a broad spectrum of ideas and perspectives regarding the improvement of inservice testing of pumps and valves at nuclear power plants. This document, Volume 1, covers sessions 1A through session 2C. The individual papers have been cataloged separately

  19. Proceedings of the Third NRC/ASME Symposium on Valve and Pump Testing. Session 1A--Session 2C: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Symposium on Valve and Pump Testing, jointly sponsored by the Board of Nuclear Codes and Standards of the American Society of Mechanical Engineers and by the Nuclear Regulatory Commission, provides a forum for the discussion of current programs and methods for inservice testing and motor-operated valve testing at nuclear power plants. The symposium also provides an opportunity to discuss the need to improve that testing in order to help ensure the reliable performance of pumps and valves. The participation of industry representatives, regulators, and consultants results in the discussion of a broad spectrum of ideas and perspectives regarding the improvement of inservice testing of pumps and valves at nuclear power plants. This document, Volume 1, covers sessions 1A through session 2C. The individual papers have been cataloged separately.

  20. Diode-laser-pumped high efficiency continuous-wave operation at 912 nm laser in Nd:GdVO4 crystal

    International Nuclear Information System (INIS)

    Yu, X; Chen, F; Gao, J; Li, X D; Yan, R P; Zhang, K; Yu, J H; Zhang, Z H

    2009-01-01

    High efficiency operation on continuous-wave (cw) 912 nm laser at room temperature in Nd:GdVO 4 crystal pumped by 808 nm diode-laser is reported in this letter. The maximum output power of 8.0 W was obtained at the incident un-polarized pump power of 47.0 W, giving the corresponding optical-to-optical conversion efficiency of 17.0% and the average slope efficiency of 22.9%. Further tests show that the lasing threshold is reduced and the efficiency is increased evidently when using the π-polarized 808 nm pump source. 4.8 W 912 nm laser was achieved at the polarized pump power of 21.8 W, optical-to-optical conversion efficiency is increased to 22.0% and average slope efficiency is up to 33.6%

  1. Procurement specification high vacuum test chamber and pumping system

    International Nuclear Information System (INIS)

    1976-01-01

    The specification establishes requirements for a high-vacuum test chamber, associated vacuum pumps, valves, controls, and instrumentation that shall be designed and fabricated for use as a test chamber for testing a closed loop Brayton Isotope Power System (BIPS) Ground Demonstration System (GDS). The vacuum system shall include all instrumentation required for pressure measurement and control of the vacuum pumping system. A general outline of the BIPS-GDS in the vacuum chamber and the preliminary piping and instrumentation interface to the vacuum chamber are shown

  2. Power-Cooling-Mismatch Test Series Test PCM-7. Experiment operating specifications

    International Nuclear Information System (INIS)

    Sparks, D.T.; Smith, R.H.; Stanley, C.J.

    1979-02-01

    The experiment operating specifications for the Power-Cooling-Mismatch (PCM) Test PCM-7 to be conducted in the Power Burst Facility are described. The PCM Test Series was designed on the basis of a parametric evaluation of fuel behavior response with cladding temperature, rod internal pressure, time in film boiling, and test rod power being the variable parameters. The test matrix, defined in the PCM Experiment Requirements Document (ERD), encompasses a wide range of situations extending from pre-CHF (critical heat flux) PCMs to long duration operation in stable film boiling leading to rod failure

  3. Estimating Aquifer Properties Using Sinusoidal Pumping Tests

    Science.gov (United States)

    Rasmussen, T. C.; Haborak, K. G.; Young, M. H.

    2001-12-01

    We develop the theoretical and applied framework for using sinusoidal pumping tests to estimate aquifer properties for confined, leaky, and partially penetrating conditions. The framework 1) derives analytical solutions for three boundary conditions suitable for many practical applications, 2) validates the analytical solutions against a finite element model, 3) establishes a protocol for conducting sinusoidal pumping tests, and 4) estimates aquifer hydraulic parameters based on the analytical solutions. The analytical solutions to sinusoidal stimuli in radial coordinates are derived for boundary value problems that are analogous to the Theis (1935) confined aquifer solution, the Hantush and Jacob (1955) leaky aquifer solution, and the Hantush (1964) partially penetrated confined aquifer solution. The analytical solutions compare favorably to a finite-element solution of a simulated flow domain, except in the region immediately adjacent to the pumping well where the implicit assumption of zero borehole radius is violated. The procedure is demonstrated in one unconfined and two confined aquifer units near the General Separations Area at the Savannah River Site, a federal nuclear facility located in South Carolina. Aquifer hydraulic parameters estimated using this framework provide independent confirmation of parameters obtained from conventional aquifer tests. The sinusoidal approach also resulted in the elimination of investigation-derived wastes.

  4. Tests of a photovoltaic pump: first results

    International Nuclear Information System (INIS)

    Petroselli, A.; Pica, M.; Biondi, P.

    2005-01-01

    The paper deals with a first series of tests conducted in Viterbo (42 deg 25 min North, 12 deg 06 min East) on a PV-DC pump. This series lasted eight months - from the first days of January to the end of August 2003 - and involved measurements of: air and PV-module temperatures; solar radiations, both on horizontal surface and tilted module surface; voltage and intensity of the DC currents from the panel; pump pressures and flow rates. In total, as much as 3,150 data were collected every day. The analysis of the data allowed to obtain some simple empirical relations expressing daily pumped water volumes, instantaneous flow rates and system efficiencies as a function of both radiations and total dynamic heads [it

  5. Probabilistic assessment of night pumping operation of flammable fluids and pressure testing with maritime diesel; Analise probabilisica de seguranca para as operacoes de bombeio noturno de inflamaveis e teste de pressao com diesel maritimo

    Energy Technology Data Exchange (ETDEWEB)

    Jacinto, Carlos M.C.; Barbosa, Valdir P. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Garcia, Pauli A.A. [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil); Ramos, Fernando A.

    2008-07-01

    Some operations, due to unscientific knowledge, have been prohibited in E and P activities. Among these operations one have night pumping of flammable fluid and pressure test with maritime diesel. For this reason one has a considerable lost of time due to the necessity to wait until the morning of the day after, in case of night pumping, or due to logistic skills concerning the difficulties to obtain materials which can be adopted in place of the maritime diesel. In turn to verify, scientifically, funding on a probabilistic safety analysis, the present paper present a hybrid approach, due to the high complexity of the considered scenario. In this hybrid approach, one has: HAZOP, event trees, Bayesian network, fault trees, and Bayesian inference for expert opinions estimation. The obtained results are satisfactory haven in view that they show the probability of occurrence of a catastrophic event concerning the analyzed operations. The obtained results are very satisfactory due to the fact that the one have obtained the probability values of undesirable events, and these values can be compared to the reference one. These reference figures are known as ALARP and are proposed by HSE. (author)

  6. LMFBR with booster pump in pumping loop

    International Nuclear Information System (INIS)

    Rubinstein, H.J.

    1975-01-01

    A loop coolant circulation system is described for a liquid metal fast breeder reactor (LMFBR) utilizing a low head, high specific speed booster pump in the hot leg of the coolant loop with the main pump located in the cold leg of the loop, thereby providing the advantages of operating the main pump in the hot leg with the reliability of cold leg pump operation

  7. Effect of investments on fundamentals and market reaction on pre-operational and operational Brazilian companies for the period 2006-2012

    Directory of Open Access Journals (Sweden)

    Marco Antonio Pereira

    2016-03-01

    Full Text Available ABSTRACT This paper provides evidence on the market reaction to corporate investment decisions whose shareholder value is largely attributed to growth options. The exploratory research raised pre-operational companies and their operational pairs on the same economy segments. It had the purpose of investigating the existence of statistical differentiation from financial indicators that reflect the installed assets and growth assets, and then study the market reaction to changes in fixed assets as a signaling element about investment decisions. The formation process of operational assets and shareholder value almost exclusively dependent on asset growth stands out in the pre-operational companies. As a result, differentiation tests confirmed that the pre-operational companies had their value especially derived on growth options. The market reaction was particularly bigger in pre-operational companies with abnormal negative stock returns, while the operational companies had positive returns, which may indicate that the quality of the investment is judged based on the financial disclosure. Additionally, operational companies' investors await the disclosure to adjust their prices. We conclude that the results are consistent with the empirical evidence and the participants in financial markets to long-term capital formation investments should give that special attention.

  8. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    International Nuclear Information System (INIS)

    Myers, N.K.

    1997-01-01

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  9. Improved operation in CANDU plants with CAN8 PHT pump seals

    International Nuclear Information System (INIS)

    Graham, T.; McInnes, D.; Rhodes, D.

    1997-01-01

    The CAN8 PHT pump seal is currently operating in twenty-one pumps, twelve at Bruce A, seven at Bruce B and in both pumps at Grand Gulf Nuclear Station (GGNS). The CAN8 seal has markedly improved performance over the CAN2 seal previously used at the Bruce stations and the SU seals previously used at GGNS. Details of the performance improvements are discussed. Prior to installation in Bruce B, the CAN8 seal was slightly modified and then demonstrated to be resistant to reverse pressurization failures, since this was a known failure mechanism with the CAN2 seal. Subsequent experience showed that Bruce A was also susceptible to reverse pressure incidents. A review of plant operating procedures at Bruce A showed reverse pressure was likely the initiating factor for several previously unexplained seal disturbances. The reverse pressure failure mechanism is described, as are the improved system operating procedures designed to prevent it. Preventative procedures have now been implemented across Ontario Hydro Nuclear. The ability to track down seal failure mechanisms such as this is greatly enhanced by the improved system monitoring and data retrieval now in place at Bruce A and Bruce B. (author)

  10. Accidents and Incidents Related to Intravenous Drug Administration: A Pre-Post Study Following Implementation of Smart Pumps in a Teaching Hospital.

    Science.gov (United States)

    Guérin, Aurélie; Tourel, Julien; Delage, Emmanuelle; Duval, Stéphanie; David, Marie-Johanne; Lebel, Denis; Bussières, Jean-François

    2015-08-01

    Smart pumps are expected to prevent and reduce medication errors. The implementation of smart pumps requires a significant effort and collaboration of physicians, nurses, pharmacists, and other stakeholders. The main objective of this study was to evaluate the impact of new smart pumps on reported drug-related accidents and incidents (AIs). This is a descriptive retrospective pre-post study conducted at a women's and pediatric hospital with 500 beds. A strong multidisciplinary team (nurse, pharmacist, pharmacy resident, physician, biomedical technician, information technology technician, patient safety officer, manager) was involved in the planning, implementation, and monitoring technology implementation. A total of 1045 smart pumps were implemented in 2011 in our hospital. The reported number of AIs related to intravenous drug administration (AIIV) before and after the implementation of 1045 smart pumps were collected. A total of 2911 AI events related to medications, devices, and equipment were self-reported by clinical staff in the pre-phase (Y0), 3523 in the post-phase (Y1), and 2788 in the post-phase (Y2). The total AIIV increased from 1432 in Y0 to 1834 in Y1 and decreased to 1389 in Y2. We observed no risk reduction associated with the implementation of smart pumps in a 500 bed mother-child hospital. Further studies are required to explore the details of the potential risk reduction associated with the use of smart pumps.

  11. Elements for Effective Management of Operating Pump and Treat Systems

    Science.gov (United States)

    This fact sheet summarizes key aspects of effective management for operating pump and treat (P&T) systems based on lessons learned from conducting optimization evaluations at 20 Superfund-financed P&T systems.

  12. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Science.gov (United States)

    2010-07-01

    ... corrective action does not resolve the deficiency, you may request to use the contaminated system as an... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION...

  13. Transient simulation of coolant peak temperature due to prolonged fan and/or water pump operation after the vehicle is keyed-off

    Science.gov (United States)

    Pang, Suh Chyn; Masjuki, Haji Hassan; Kalam, Md. Abul; Hazrat, Md. Ali

    2014-01-01

    Automotive designers should design a robust engine cooling system which works well in both normal and severe driving conditions. When vehicles are keyed-off suddenly after some distance of hill-climbing driving, the coolant temperature tends to increase drastically. This is because heat soak in the engine could not be transferred away in a timely manner, as both the water pump and cooling fan stop working after the vehicle is keyed-off. In this research, we aimed to visualize the coolant temperature trend over time before and after the vehicles were keyed-off. In order to prevent coolant temperature from exceeding its boiling point and jeopardizing engine life, a numerical model was further tested with prolonged fan and/or water pump operation after keying-off. One dimensional thermal-fluid simulation was exploited to model the vehicle's cooling system. The behaviour of engine heat, air flow, and coolant flow over time were varied to observe the corresponding transient coolant temperatures. The robustness of this model was proven by validation with industry field test data. The numerical results provided sensible insights into the proposed solution. In short, prolonging fan operation for 500 s and prolonging both fan and water pump operation for 300 s could reduce coolant peak temperature efficiently. The physical implementation plan and benefits yielded from implementation of the electrical fan and electrical water pump are discussed.

  14. Research for correction pre-operative MRI images of brain during operation using particle method simulation

    International Nuclear Information System (INIS)

    Shino, Ryosaku; Koshizuka, Seiichi; Sakai, Mikio; Ito, Hirotaka; Iseki, Hiroshi; Muragaki, Yoshihiro

    2010-01-01

    In the neurosurgical procedures, surgeon formulates a surgery plan based on pre-operative images such as MRI. However, the brain is transformed by removal of the affected area. In this paper, we propose a method for reconstructing pre-operative images involving the deformation with physical simulation. First, the domain of brain is identified in pre-operative images. Second, we create particles for physical simulation. Then, we carry out the linear elastic simulation taking into account the gravity. Finally, we reconstruct pre-operative images with deformation according to movement of the particles. We show the effectiveness of this method by reconstructing the pre-operative image actually taken before surgery. (author)

  15. Operational tests of a device with an elevator for automated outlet of heat for heating

    Energy Technology Data Exchange (ETDEWEB)

    Zinger, N.M.; Belevich, A.I.; Burd, A.L.; Krivitskiy, V.I.; Lokshin, L.S.

    1983-01-01

    The results are presented of operational tests of series produced jet pumps. The field of use of an automated elevator is determined and recommendations for increasing its operational qualities are given.

  16. Fuel savings with conventional hot water space heating systems by incorporating a natural gas powered heat pump. Preliminary project: Development of heat pump technology

    Science.gov (United States)

    Vanheyden, L.; Evertz, E.

    1980-12-01

    Compression type air/water heat pumps were developed for domestic heating systems rated at 20 to 150 kW. The heat pump is driven either by a reciprocating piston or rotary piston engine modified to operate on natural gas. Particular features of natural gas engines as prime movers, such as waste heat recovery and variable speed, are stressed. Two systems suitable for heat pump operation were selected from among five different mass produced car engines and were modified to incorporate reciprocating piston compressor pairs. The refrigerants used are R 12 and R 22. Test rig data transferred to field conditions show that the fuel consumption of conventional boilers can be reduced by 50% and more by the installation of engine driven heat pumps. Pilot heat pumps based on a 1,600 cc reciprocating piston engine were built for heating four two-family houses. Pilot pump operation confirms test rig findings. The service life of rotary piston and reciprocating piston engines was investigated. The tests reveal characteristic curves for reciprocating piston engines and include exhaust composition measurements.

  17. Proceedings of the symposium on inservice testing of pumps and valves

    International Nuclear Information System (INIS)

    1990-10-01

    The 1990 Symposium on Inservice Testing of Pumps and Valves, jointly sponsored by the Board on Nuclear Codes and Standards of the American Society of Mechanical Engineers and by the Nuclear Regulatory Commission, provided a forum for the discussion of current programs and methods for inservice testing at nuclear power plants. The symposium also provided an opportunity to discuss the need to improve inservice testing in order to ensure the reliable performance of pumps and valves. The participation of industry representatives, regulators, and consultants resulted in the discussion of a broad spectrum of ideas and perspectives regarding the improvement of inservice testing of pumps and valves at nuclear power plants

  18. Proceedings of the symposium on inservice testing of pumps and valves

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-01

    The 1990 Symposium on Inservice Testing of Pumps and Valves, jointly sponsored by the Board on Nuclear Codes and Standards of the American Society of Mechanical Engineers and by the Nuclear Regulatory Commission, provided a forum for the discussion of current programs and methods for inservice testing at nuclear power plants. The symposium also provided an opportunity to discuss the need to improve inservice testing in order to ensure the reliable performance of pumps and valves. The participation of industry representatives, regulators, and consultants resulted in the discussion of a broad spectrum of ideas and perspectives regarding the improvement of inservice testing of pumps and valves at nuclear power plants.

  19. Test report for run-in acceptance testing of hydrogen mitigation test pump-2

    International Nuclear Information System (INIS)

    Brewer, A.K.; Kolowith, R.

    1995-01-01

    This document provides the results of the run-in test of the replacement mixer pump for the Tank 241-SY-101. The test was conducted at the 400 Area MASF facility between August 12 and September 29, 1994. The report includes findings, analysis, recommendations, and corrective actions taken

  20. Study on transient hydrodynamic performance and cavitation characteristic of high-speed mixed-flow pump

    International Nuclear Information System (INIS)

    Chen, T; Liu, Y L; Sun, Y B; Wang, L Q; Wu, D Z

    2013-01-01

    In order to analyse the hydrodynamic performance and cavitation characteristic of a high-speed mixed-flow pump during transient operations, experimental studies were carried out. The transient hydrodynamic performance and cavitation characteristics of the mixed-flow pump with guide vane during start-up operation processes were tested on the pump performance test-bed. Performance tests of the pump were carried out under various inlet pressures and speed-changing operations. The real-time instantaneous external characteristics such as rotational speed, hydraulic head, flow rate, suction pressure and discharge pressure of the pump were measured. Based on the experimental results, the effect of fluid acceleration on the hydrodynamic performances and cavitation characteristics of the mixed-flow pump were analysed and evaluated

  1. Influence of individual heat pumps on wind power integration – Energy system investments and operation

    DEFF Research Database (Denmark)

    Hedegaard, Karsten; Münster, Marie

    2013-01-01

    Individual heat pumps are expected to constitute a significant electricity demand in future energy systems. This demand becomes flexible if investing in complementing heat storage capabilities. In this study, we analyse how the heat pumps can influence the integration of wind power by applying...... an energy system model that optimises both investments and operation, and covers various heat storage options. The Danish energy system by 2030 with around 50–60% wind power is used as a case study. Results show that the heat pumps, even without flexible operation, can contribute significantly...... to facilitating larger wind power investments and reducing system costs, fuel consumption, and CO2 emissions. Investments in heat storages can provide only moderate system benefits in these respects. The main benefit of the flexible heat pump operation is a reduced need for peak/reserve capacity, which is also...

  2. LLNL Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, R. P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-14

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  3. Solving optimum operation of single pump unit problem with ant colony optimization (ACO) algorithm

    International Nuclear Information System (INIS)

    Yuan, Y; Liu, C

    2012-01-01

    For pumping stations, the effective scheduling of daily pump operations from solutions to the optimum design operation problem is one of the greatest potential areas for energy cost-savings, there are some difficulties in solving this problem with traditional optimization methods due to the multimodality of the solution region. In this case, an ACO model for optimum operation of pumping unit is proposed and the solution method by ants searching is presented by rationally setting the object function and constrained conditions. A weighted directed graph was constructed and feasible solutions may be found by iteratively searching of artificial ants, and then the optimal solution can be obtained by applying the rule of state transition and the pheromone updating. An example calculation was conducted and the minimum cost was found as 4.9979. The result of ant colony algorithm was compared with the result from dynamic programming or evolutionary solving method in commercial software under the same discrete condition. The result of ACO is better and the computing time is shorter which indicates that ACO algorithm can provide a high application value to the field of optimal operation of pumping stations and related fields.

  4. The cryogenic pumping section of KATRIN and the test experiment TRAP

    CERN Document Server

    Eichelhardt, F

    2011-01-01

    The Karlsruhe Tritium Neutrino experiment (KATRIN) employs a Cryogenic Pumping Section (CPS) at ~ 4.5 K to suppress the tritium penetration into the spectrometers. A test experiment (TRAP - Tritium Argon frost Pump) has been set up to investigate the tritium pumping performance of the CPS.

  5. Thermal-Hydraulic Experiment To Test The Stable Operation Of A PIUS Type Reactor

    International Nuclear Information System (INIS)

    Irianto, Djoko; Kanji, T.; Kukita, Y.

    1996-01-01

    An advanced type of reaktor concept as the Process Inherent Ultimate Safety (PIUS) reactor was based on intrinsically passive safety considerations. The stable operation of a PIUS type reactor is based on the automation of circulation pump speed. An automatic circulation pump speed control system by using a measurement of the temperature distribution in the lower density lock is proposed the PIUS-type reactor. In principle this control system maintains the fluid temperature at the axial center of the lower density lock at average of the fluid temperatures below and above the lower density lock. This control system will prevent the poison water from penetrating into the core during normal operation. The effectiveness of this control system was successfully confirmed by a series of experiments using atmospheric pressure thermal-hydraulic test loop which simulated the PIUS principle. The experiments such as: start-up and power ramping tests for normal operation simulation and loss of feedwater test for an accident condition simulation, carried out in JAERI

  6. Auto-control of pumping operations in sewerage systems by rule-based fuzzy neural networks

    Directory of Open Access Journals (Sweden)

    Y.-M. Chiang

    2011-01-01

    Full Text Available Pumping stations play an important role in flood mitigation in metropolitan areas. The existing sewerage systems, however, are facing a great challenge of fast rising peak flow resulting from urbanization and climate change. It is imperative to construct an efficient and accurate operating prediction model for pumping stations to simulate the drainage mechanism for discharging the rainwater in advance. In this study, we propose two rule-based fuzzy neural networks, adaptive neuro-fuzzy inference system (ANFIS and counterpropagation fuzzy neural network for on-line predicting of the number of open and closed pumps of a pivotal pumping station in Taipei city up to a lead time of 20 min. The performance of ANFIS outperforms that of CFNN in terms of model efficiency, accuracy, and correctness. Furthermore, the results not only show the predictive water levels do contribute to the successfully operating pumping stations but also demonstrate the applicability and reliability of ANFIS in automatically controlling the urban sewerage systems.

  7. Development and test of a plastic deep-well pump

    International Nuclear Information System (INIS)

    Zhang, Q H; Gao, X F; Xu, Y; Shi, W D; Lu, W G; Liu, W

    2013-01-01

    To develop a plastic deep-well pump, three methods are proposed on structural and forming technique. First, the major hydraulic components are constructed by plastics, and the connection component is constructed by steel. Thus the pump structure is more concise and slim, greatly reducing its weight and easing its transportation, installation, and maintenance. Second, the impeller is designed by maximum diameter method. Using same pump casing, the stage head is greatly increased. Third, a sealing is formed by impeller front end face and steel end face, and two slots are designed on the impeller front end face, thus when the two end faces approach, a lubricating pair is formed, leading to an effective sealing. With above methods, the pump's axial length is greatly reduced, and its stage head is larger and more efficient. Especially, the pump's axial force is effectively balanced. To examine the above proposals, a prototype pump is constructed, and its testing results show that the pump efficiency exceeds the national standard by 6%, and the stage head is improved by 41%, meanwhile, its structure is more concise and ease of transportation. Development of this pump would provide useful experiences for further popularity of plastic deep-well pumps

  8. Pre-operative assessment and post-operative care in elective shoulder surgery.

    Science.gov (United States)

    Akhtar, Ahsan; Macfarlane, Robert J; Waseem, Mohammad

    2013-01-01

    Pre-operative assessment is required prior to the majority of elective surgical procedures, primarily to ensure that the patient is fit to undergo surgery, whilst identifying issues that may need to be dealt with by the surgical or anaesthetic teams. The post-operative management of elective surgical patients begins during the peri-operative period and involves several health professionals. Appropriate monitoring and repeated clinical assessments are required in order for the signs of surgical complications to be recognised swiftly and adequately. This article examines the literature regarding pre-operative assessment in elective orthopaedic surgery and shoulder surgery, whilst also reviewing the essentials of peri- and post-operative care. The need to recognise common post-operative complications early and promptly is also evaluated, along with discussing thromboprophylaxis and post-operative analgesia following shoulder surgery.

  9. Operability Test Report for 241-U Compressed Air System and heat pump

    International Nuclear Information System (INIS)

    Rensink, G.E.

    1995-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The system was upgraded. The operability test showed that the system operates within its intended design parameters. System performance was monitored, recorded, and used to identify areas of concern. Exceptions to the OTP and additional items for safe system performance were minimal and have been resolved; the air system is ready for Operation's use

  10. The Advanced Limiter Test-I (ALT-I) variable-geometry pump limiter module

    International Nuclear Information System (INIS)

    Pontau, A.E.; Malinowski, M.E.; Ver Berkmoes, A.A.; Guthrie, S.E.; Watson, R.D.; Goebel, D.M.; Campbell, G.A.

    1984-01-01

    The ALT-I variable geometry module has been designed to address many of the issues not previously settled by earlier experiments. The goal is to study the basic processes involved in pump limiter operation as well as demonstrate its utility and effect on the plasma. The flexibility and extensive instrumentation of ALT-I will offer a unique opportunity to parameterize operation and facilitate the engineering design of future pump limiters. (orig.)

  11. Pre-operative fasting guidelines: an update

    DEFF Research Database (Denmark)

    Søreide, E; Eriksson, L I; Hirlekar, G

    2005-01-01

    Liberal pre-operative fasting routines have been implemented in most countries. In general, clear fluids are allowed up to 2 h before anaesthesia, and light meals up to 6 h. The same recommendations apply for children and pregnant women not in labour. In children......Liberal pre-operative fasting routines have been implemented in most countries. In general, clear fluids are allowed up to 2 h before anaesthesia, and light meals up to 6 h. The same recommendations apply for children and pregnant women not in labour. In children...

  12. Testing a Quantum Heat Pump with a Two-Level Spin

    Directory of Open Access Journals (Sweden)

    Luis A. Correa

    2016-04-01

    Full Text Available Once in its non-equilibrium steady state, a nanoscale system coupled to several heat baths may be thought of as a “quantum heat pump”. Depending on the direction of its stationary heat flows, it may function as, e.g., a refrigerator or a heat transformer. These continuous heat devices can be arbitrarily complex multipartite systems, and yet, their working principle is always the same: they are made up of several elementary three-level stages operating in parallel. As a result, it is possible to devise external “black-box” testing strategies to learn about their functionality and performance regardless of any internal details. In particular, one such heat pump can be tested by coupling a two-level spin to one of its “contact transitions”. The steady state of this external probe contains information about the presence of heat leaks and internal dissipation in the device and, also, about the direction of its steady-state heat currents. Provided that the irreversibility of the heat pump is low, one can further estimate its coefficient of performance. These techniques may find applications in the emerging field of quantum thermal engineering, as they facilitate the diagnosis and design optimization of complex thermodynamic cycles.

  13. What we learn from surveillance testing of standby turbine driven and motor driven pumps

    International Nuclear Information System (INIS)

    Christie, B.

    1996-01-01

    This paper describes a comparison of the performance information collected by the author and the respective system engineers from five standby turbine driven pumps at four commercial nuclear electric generating units in the United States and from two standby motor driven pumps at two of these generating units. Information was collected from surveillance testing and from Non-Test actuations. Most of the performance information (97%) came from surveillance testing. open-quotes Conditional Probabilitiesclose quotes of the pumps ability to respond to a random demand were calculated for each of the seven standby pumps and compared to the historical record of the Non-Test actuations. It appears that the Conditional Probabilities are comparable to the rate of success for Non-Test actuations. The Conditional Probabilities of the standby motor driven pumps (approximately 99%) are better than the Conditional Probabilities of the standby turbine driven pumps (82%-96% range). Recommendations were made to improve the Conditional Probabilities of the standby turbine driven pumps

  14. What we learn from surveillance testing of standby turbine driven and motor driven pumps

    Energy Technology Data Exchange (ETDEWEB)

    Christie, B.

    1996-12-01

    This paper describes a comparison of the performance information collected by the author and the respective system engineers from five standby turbine driven pumps at four commercial nuclear electric generating units in the United States and from two standby motor driven pumps at two of these generating units. Information was collected from surveillance testing and from Non-Test actuations. Most of the performance information (97%) came from surveillance testing. {open_quotes}Conditional Probabilities{close_quotes} of the pumps ability to respond to a random demand were calculated for each of the seven standby pumps and compared to the historical record of the Non-Test actuations. It appears that the Conditional Probabilities are comparable to the rate of success for Non-Test actuations. The Conditional Probabilities of the standby motor driven pumps (approximately 99%) are better than the Conditional Probabilities of the standby turbine driven pumps (82%-96% range). Recommendations were made to improve the Conditional Probabilities of the standby turbine driven pumps.

  15. Analysis of pumping tests: Significance of well diameter, partial penetration, and noise

    Science.gov (United States)

    Heidari, M.; Ghiassi, K.; Mehnert, E.

    1999-01-01

    The nonlinear least squares (NLS) method was applied to pumping and recovery aquifer test data in confined and unconfined aquifers with finite diameter and partially penetrating pumping wells, and with partially penetrating piezometers or observation wells. It was demonstrated that noiseless and moderately noisy drawdown data from observation points located less than two saturated thicknesses of the aquifer from the pumping well produced an exact or acceptable set of parameters when the diameter of the pumping well was included in the analysis. The accuracy of the estimated parameters, particularly that of specific storage, decreased with increases in the noise level in the observed drawdown data. With consideration of the well radii, the noiseless drawdown data from the pumping well in an unconfined aquifer produced good estimates of horizontal and vertical hydraulic conductivities and specific yield, but the estimated specific storage was unacceptable. When noisy data from the pumping well were used, an acceptable set of parameters was not obtained. Further experiments with noisy drawdown data in an unconfined aquifer revealed that when the well diameter was included in the analysis, hydraulic conductivity, specific yield and vertical hydraulic conductivity may be estimated rather effectively from piezometers located over a range of distances from the pumping well. Estimation of specific storage became less reliable for piezemeters located at distances greater than the initial saturated thickness of the aquifer. Application of the NLS to field pumping and recovery data from a confined aquifer showed that the estimated parameters from the two tests were in good agreement only when the well diameter was included in the analysis. Without consideration of well radii, the estimated values of hydraulic conductivity from the pumping and recovery tests were off by a factor of four.The nonlinear least squares method was applied to pumping and recovery aquifer test data in

  16. Development of ANC-type empirical two-phase pump model for full size CANDU primary heat transport pump

    International Nuclear Information System (INIS)

    Chan, A.M.C.; Huynh, H.M.

    2004-01-01

    The development of an ANC-type empirical two-phase pump model for CANDU (Canadian Deuterium) reactor primary heat transport pumps is described in the present paper. The model was developed based on Ontario Hydro Technologies' full scale Darlington pump first quadrant test data. The functional form of the ANC model which is widely used was chosen to facilitate the implementation of the model into existing computer codes. The work is part of a bigger test program with the aims: (1) to produce high quality pump performance data under off-normal operating conditions using both full-size and model scale pumps; (2) to advance our basic understanding of the dominant mechanisms affecting pump performance based on more detailed local measurements; and (3) to develop a 'best-estimate' or improved pump model for use in reactor licensing and safety analyses. (author)

  17. Operation of heat pumps for smart grid integrated buildings with thermal energy storage

    NARCIS (Netherlands)

    Finck, C.J.; Li, R.; Zeiler, W.

    2017-01-01

    A small scale office building consisting of radiant heating, a heat pump, and a water thermal energy storage tank is implemented in an optimal control framework. The optimal control aims to minimize operational electricity costs of the heat pump based on real-time power spot market prices. Optimal

  18. Spare mitigation/retrieval mixer pumps

    International Nuclear Information System (INIS)

    Taylor, S.

    1995-01-01

    This document presents the functional design criteria for design, analysis, fabrication, testing, and installation of a waste tank mixer pump. The mixer pump will be operated to eliminate the periodic releases of large quantities of flammable gas (e.g., hydrogen) from Hanford Site waste tanks and also to accommodate retrieval of tank waste

  19. Assessment of 99Tcm-ethylenedicysteine diuretic renography in pre-and post-operative pediatric congenital hydronephrosis

    International Nuclear Information System (INIS)

    Ye Zhiyi; Wang Hui; Li Jianing; Fu Hongliang; Wu Jingchuan

    2010-01-01

    Objective: To investigate the clinical value of 99 Tc m -ethylenedicysteine (EC) diuretic renography (DR) in pre-and post-operative pediatric congenital hydronephrosis. Methods: The DR with injection of Furosemide at 15 min of forty children with hydronephrosis was retrospectively studied. The preoperative renal blood perfusion rate (BPR), effective renal plasma flow (ERPF), grade of hydronephrosis,renogram and renal dynamic imaging of pre- and post-operative kidneys were compared. The t-test and Mann-Whitney test were used for data analysis. Results: (1) Of 40 pathological kidneys, the BPR increased 5.99% (t=-5.13, P<0.01) from pre-operative to post-operative: (34.05 ± 11.07)% to (40.04 ± 8.56)%. The ERPF increased 12.48 ml/min (t=-4.35, P<0.01) from pre-operative to post-operative: (57.81 ± 34.32) ml/min to (70.29 ± 5.37) ml/min. (2) The grade of hydronephrosis of 40 pathological kidneys improved significantly(Z=-2.64, P<0.01) with the mean sum of ranks of 47.21 pre-operatively to 33.79 post-operatively.(3) As the hydronephrosis worsened, the collecting system became bigger, the renal parenchyma became thinner, the extent of intrarenal parenchymal photopenia became larger and the response to diuretic challenge in pathological kidneys decreased or became totally irresponsive. (4)Thirty-seven cases of obstruction at ureteropelvic junction (UPJO) and 3 cases at ureterovesical junction (UVJO) were diagnosed by DR, which were all confirmed by surgery. Conclusions: DR is a reliable method to evaluate pediatric congenital hydronephrosis.It can accurately reflect the grade and (or) severity of the disease, guide therapy and assess the therapeutic success of operation. (authors)

  20. Vapor compression heat pump system field tests at the tech complex

    Science.gov (United States)

    Baxter, Van D.

    1985-11-01

    The Tennessee Energy Conservation In Housing (TECH) complex has been utilized since 1977 as a field test site for several novel and conventional heat pump systems for space conditioning and water heating. Systems tested include the Annual Cycle Energy System (ACES), solar assisted heat pumps (SAHP) both parallel and series, two conventional air-to-air heat pumps, an air-to-air heat pump with desuperheater water heater, and horizontal coil and multiple shallow vertical coil ground-coupled heat pumps (GCHP). A direct comparison of the measured annual performance of the test systems was not possible. However, a cursory examination revealed that the ACES had the best performance, however, its high cost makes it unlikely that it will achieve wide-spread use. Costs for the SAHP systems are similar to those of the ACES but their performance is not as good. Integration of water heating and space conditioning functions with a desuperheater yielded significant efficiency improvement at modest cost. The GCHP systems performed much better for heating than for cooling and may well be the most efficient alternative for residences in cold climates.

  1. Endurance Pump Tests With Fresh and Purified MIL-PRF-83282 Hydraulic Fluid

    National Research Council Canada - National Science Library

    Sharma, Shashi

    1999-01-01

    .... Two endurance pump tests were conducted with F-16 aircraft hydraulic pumps, using both fresh and purified MIL-PRF-83282 hydraulic fluid, to determine if fluid purification had any adverse effect on pump life...

  2. Studying the dynamical characteristics of pumps in NPP unit auxiliary water system under operational conditions

    International Nuclear Information System (INIS)

    Belyaev, S.G.; Puzanov, A.I.; Belikov, V.P.; Dizik, B.S.

    1990-01-01

    Hydrodynamic loads appearing in the flow-through part of pump aggregates of the system of auxiliary water supply in NPP with variations in the operation modes are investigated. It is shown that during operation of centrifugal pumps the position of the mode on the pump characteristic plot must be controlled. When the mode point exceeds the limits of the working zone it results in a considerable increase of dynamic loads: pressure pulsation and vibration. As the flow rate increase the decrease in dynamic loads is recorded at low frequencies of about 2-4 Hz

  3. A novel energy regeneration system for emulsion pump tests

    Energy Technology Data Exchange (ETDEWEB)

    Yilei, Li; Zhencai, Zhu; Guohua, Cao [China University of Mining and Technology, Xuzhou (China); Guoan, Chen [Command Academy of the Corps of Engineers, Xuzhou (China)

    2013-04-15

    A novel energy regeneration system based on cylinders and a rectifier valve for emulsion pump tests is presented and studied. The overall structure and working principles of this system are introduced. Both simulation and experiments are carried out to investigate the energy regeneration feasibility and capability of this novel system. The simulation and experimental results validate that this system is able to save energy and satisfy the test requirement. The energy recovery coefficient and overall energy regeneration coefficient of the test bench are 0.785 and 0.214, respectively. Measures to improve these two coefficients are also given accordingly after analysis of power loss. This novel system brings a new method of energy regeneration for emulsion pump tests.

  4. Method for pre-heating lmfbr type reactors

    International Nuclear Information System (INIS)

    Yokozawa, Atsushi; Kataoka, Hajime.

    1978-01-01

    Purpose: To enable pre-heating for the inside of the reactor container and the inside of the coolant recycling system with no additional facilities. Method: The coolant recycling system is composed of a heat exchanger, a mechanical pump, a check valve, a flow meter or the like and it is connected in series by way of a pipe line to a reactor container. The mechanical pump is used as a gas recycling device upon pre-heating and it is designed so that a blower such as a fan can be replaced for the impeller of the pump. The inside of the reactor container and the inside of the coolant recycling system is at first filled with an inert gas such as for use with cover gas. Then, nuclear fuels are loaded to attain criticality. Simultaneously, the blower is started and the control rods are operated while cooling the nuclear fuel with the inert gas thus to obtain heat required for pre-heating the pipe line or the like from the nuclear fuels. After the completion of the pre-heating, the liquid metal is charged. (Ikeda, J.)

  5. Direct solar-pumped iodine laser amplifier

    Science.gov (United States)

    Han, Kwang S.

    1987-01-01

    This semiannual progress report covers the period from March 1, 1987 to September 30, 1987 under NASA grant NAG1-441 entitled 'Direct solar-pumped iodine laser amplifier'. During this period Nd:YAG and Nd:Cr:GSGG crystals have been tested for the solar-simulator pumped cw laser, and loss mechanisms of the laser output power in a flashlamp-pumped iodine laser also have been identified theoretically. It was observed that the threshold pump-beam intensities for both Nd:YAG and Nd:Cr:GSGG crystals were about 1000 solar constants, and the cw laser operation of the Nd:Cr:GSGG crystal was more difficult than that of the Nd:YAG crystal under the solar-simulator pumping. The possibility of the Nd:Cr:GSGG laser operation with a fast continuously chopped pumping was also observed. In addition, good agreement between the theoretical calculations and the experimental data on the loss mechanisms of a flashlamp-pumped iodine laser at various fill pressures and various lasants was achieved.

  6. Initial operating experience and recent development on the TRIUMF optically pumped polarized H- ion source

    International Nuclear Information System (INIS)

    Schmor, P.W.; Law, W.M.; Levy, C.D.P.; McDonald, M.

    1988-01-01

    A polarized H - ion source using optical pumping techniques has been developed at TRIUMF. This source was used to demonstrate (on an ion source test stand) the feasibility of producing 10- μA of ∼ 60% polarized H - ion beam in a dc mode suitable for injection into the TRIUMF cyclotron. The source has been installed in a 300 kV high voltage terminal connected to the cyclotron via a recently constructed beam transport line. A polarization of 80% is anticipated near the end of 1988 after the installation of a superconducting solenoid to the source. In this paper the authors describe the initial operating experience, recent developments, and the future plans for the TRIUMF optically pumped polarized ion source

  7. Test results for the Oasis 3C high performance water-pumping windmill

    Energy Technology Data Exchange (ETDEWEB)

    Eggleston, D.M. [DME Engineering, Midland, TX (United States)

    1997-12-31

    The WINDTech International, L.L.C. Oasis 3C, a 3 m diameter, high-performance water-pumping windmill, was tested at the DME Engineering Wind Test Site just south of Midland, Texas from August through December, 1996. This machine utilizes a 3:1 gearbox with rotating counterweights, similar to a conventional oilfield pumping unit, driven by a multibladed rotor. The rotating counterweight system balances most of the pumping loads and reduces gear loads and starting torque by a factor of at least two and often by a factor of four or more. The torque reduction substantially extends gear and bearing life, and reduces wind speeds required for starting by 30 to 50% or more. The O3C was tested pumping from a quiescent fluid depth of 12.2 m (40 ft) from a 28.3 m (93 ft)-deep well, with additional pumping depth simulated using a pressure regulator valve system. A 9.53 cm (3.75 in.) diameter Harbison-Fischer seal-less single-acting piston pump was used to eliminate pump seal friction as a variable, and standard O3C stroke lengths of 30.5 and 15.2 cm (12 and 6 inches) were used. The regulator spring was set to give a maximum stroke rate of 33 strokes per minute. The water pumped was returned to the well after flowing through a settling tank. The tests were performed in accordance with AWEA WECS testing standards. Instrumentation provided 16 channels of data to accurately measure machine performance, including starting wind speeds, flow rates, O3C azimuth, tail furl angle, wind direction tracking errors, RPM, sucker rod loads, and other variables. The most significant performance data is summarized herein. A mathematical model of machine performance was developed that fairly accurately predicts performance for each of three test conditions. The results verify that the O3C is capable of pumping water at wind speeds from 30% to more than 50% lower than comparable un-counterbalanced units.

  8. Feedback control of a primary pump for safe and stable operation of a PIUS-type reactor

    International Nuclear Information System (INIS)

    Tasaka, K.; Imai, S.; Masaoka, H.; Tamaki, M.; Kukita, Y.

    1993-01-01

    A new automatic pump speed control system by using a measurement of the temperature distribution in the lower density lock is proposed for the PIUS-type reactor. This control system maintains the fluid temperature at the axial center of the lower density lock at the average of the fluid temperatures below and above the density lock in order to prevent the poison water from penetrating into the core during normal operation. The effectiveness of this control system was successfully confirmed by a series of experiments such as start-up and power ramping tests for the stable normal operation and a loss-of-feedwater test for the safe shutdown in an accident condition, using a small scale atmospheric pressure test loop which simulated the PIUS principle. (orig.)

  9. Long-term impact of pre-operative physical rehabilitation protocol on the 6-min walk test of patients with adolescent idiopathic scoliosis: A randomized clinical trial

    Directory of Open Access Journals (Sweden)

    V.L. dos Santos Alves

    2015-05-01

    Full Text Available Background: Monitored physical activities in patients with adolescent idiopathic scoliosis (AIS have been shown to improve physical performance, endurance and cardiopulmonary function and may be assessed by the 6-min walk test (6MWT. We aimed to evaluate the long-term results of the 6MWT after a rehabilitation protocol employed before surgical correction for AIS. Methods: This prospective randomized clinical trial studied the impact of a 4-month pre-operative physical rehabilitation protocol on post-operative cardiopulmonary function and physical endurance, by using the 6MWT, in patients with AIS submitted to surgical correction, comparing them to matched controls without physical rehabilitation. Studied variables were heart and respiratory rate, systolic and diastolic blood pressure, peripheral blood oxygen saturation, Borg score, and distance walked. Patients were assessed at baseline, after 4 months of rehabilitation, and 3, 6 and 12 months post-operatively. Results: A total of 50 patients with AIS were included in the study and allocated blindly, by simple randomization, into either one of the two groups, with 25 patients each: study group (pre-operative physical rehabilitation and control group. The physical rehabilitation protocol promoted significant progressive improvement in heart and respiratory rate, peripheral blood oxygen saturation, distance walked, and level of effort assessed by the Borg scale after surgery. Conclusions: Post-surgical recovery, evaluated by 6MWT, was significantly better in patients who underwent a 4-month pre-operative physical rehabilitation protocol. Keywords: Scoliosis, Exercise, Exercise movement techniques, Exercise therapy, Exercise test

  10. Hydraulic development of high specific-speed pump-turbines by means of an inverse design method, numerical flow-simulation (CFD) and model testing

    International Nuclear Information System (INIS)

    Kerschberger, P; Gehrer, A

    2010-01-01

    In recent years an increased interest in pump-turbines has been recognized in the market. The rapid availability of pumped storage schemes and the benefits to the power system by peak lopping, providing reserve and rapid response for frequency control are becoming of growing advantage. In that context it is requested to develop pump-turbines that reliably stand dynamic operation modes, fast changes of the discharge rate by adjusting the variable diffuser vanes as well as fast changes from pump to turbine operation. Within the present study various flow patterns linked to the operation of a pump-turbine system are discussed. In that context pump and turbine mode are presented separately and different load cases at both operation modes are shown. In order to achieve modern, competitive pump-turbine designs it is further explained which design challenges should be considered during the geometry definition of a pump-turbine impeller. Within the present study a runner-blade profile for a low head pump-turbine has been developed. For the initial hydraulic runner-blade design, an inverse design method has been applied. Within this design procedure, a first blade geometry is generated by imposing the pressure loading-distribution and by means of an inverse 3D potential-flow-solution. The hydraulic behavior of both, pump-mode and turbine-mode is then evaluated by solving the full 3D Navier-Stokes equations in combination with a robust turbulence model. Based on this initial design the blade profile has been further optimized and redesigned considering various hydraulic pump-turbine requirements. Finally, the progress in hydraulic design is demonstrated by model test results which show a significant improvement in hydraulic performance compared to an existing reference design.

  11. Hydraulic development of high specific-speed pump-turbines by means of an inverse design method, numerical flow-simulation (CFD) and model testing

    Science.gov (United States)

    Kerschberger, P.; Gehrer, A.

    2010-08-01

    In recent years an increased interest in pump-turbines has been recognized in the market. The rapid availability of pumped storage schemes and the benefits to the power system by peak lopping, providing reserve and rapid response for frequency control are becoming of growing advantage. In that context it is requested to develop pump-turbines that reliably stand dynamic operation modes, fast changes of the discharge rate by adjusting the variable diffuser vanes as well as fast changes from pump to turbine operation. Within the present study various flow patterns linked to the operation of a pump-turbine system are discussed. In that context pump and turbine mode are presented separately and different load cases at both operation modes are shown. In order to achieve modern, competitive pump-turbine designs it is further explained which design challenges should be considered during the geometry definition of a pump-turbine impeller. Within the present study a runner-blade profile for a low head pump-turbine has been developed. For the initial hydraulic runner-blade design, an inverse design method has been applied. Within this design procedure, a first blade geometry is generated by imposing the pressure loading-distribution and by means of an inverse 3D potential-flow-solution. The hydraulic behavior of both, pump-mode and turbine-mode is then evaluated by solving the full 3D Navier-Stokes equations in combination with a robust turbulence model. Based on this initial design the blade profile has been further optimized and redesigned considering various hydraulic pump-turbine requirements. Finally, the progress in hydraulic design is demonstrated by model test results which show a significant improvement in hydraulic performance compared to an existing reference design.

  12. Investigation of the Influence of Operating Point on the Shape and Position of Textilem Material in the Inlet Pipe to a Dry-installed Wastewater Pump

    DEFF Research Database (Denmark)

    Jensen, Anna Lyhne; Gerlach, Stefan; Lykholt-Ustrup, Flemming

    2017-01-01

    station with major parts constructed in acrylic glass, enabling good visual access, six parameters of shape, position and orientation of dustcloths in the pumping system are investigated at nine different operating points. In each test, 20 dustcloths are added to the pump sump and a fast digital camera...

  13. Agreement between pre-operative and intra-operative bacteriological samples in 85 chronic peri-prosthetic infections.

    Science.gov (United States)

    Matter-Parrat, V; Ronde-Oustau, C; Boéri, C; Gaudias, J; Jenny, J-Y

    2017-04-01

    Whether pre-operative microbiological sampling contributes to the management of chronic peri-prosthetic infection remains controversial. We assessed agreement between the results of pre-operative and intra-operative samples in patients undergoing single-stage prosthesis exchange to treat chronic peri-prosthetic infection. Agreement between pre-operative and intra-operative samples exceeds 75% in patients undergoing single-stage exchange of a hip or knee prosthesis to treat chronic peri-prosthetic infection. This single-centre retrospective study included 85 single-stage prosthesis exchange procedures in 82 patients with chronic peri-prosthetic infection at the hip or knee. Agreement between pre-operative and intra-operative sample results was evaluated. Changes to the initial antibiotic regimen made based on the intra-operative sample results were recorded. Of 149 pre-operative samples, 109 yielded positive cultures, in 75/85 cases. Of 452 intra-operative samples, 354 yielded positive cultures, in 85/85 cases. Agreement was complete in 54 (63%) cases and partial in 9 (11%) cases; there was no agreement in the remaining 22 (26%) cases. The complete agreement rate was significantly lower than 75% (P=0.01). The initial antibiotic regimen was inadequate in a single case. Pre-operative sampling may contribute to the diagnosis of peri-prosthetic infection but is neither necessary nor sufficient to confirm the diagnosis and identify the causative agent. The spectrum of the initial antibiotic regimen cannot be safely narrowed based on the pre-operative sample results. We suggest the routine prescription of a probabilistic broad-spectrum antibiotic regimen immediately after the prosthesis exchange, even when a pathogen was identified before surgery. IV, retrospective study. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  14. Improvement of seawater booster pump outlet check valve

    International Nuclear Information System (INIS)

    Li Xuning; Du Yansong; Huang Huimin

    2010-01-01

    Conventional island seawater booster pump set of QNPC 310 MWe unit are very important in the whole circulating cooling system, and the integrate function of seawater booster pump outlet check valve is the foundation of steady operation of the seawater booster pump set. The article mainly introduce that through the analyses to the reason to the problem that the seawater booster pump outlet check valve of QNPC 310 MWe unit appeared in past years by our team, and considering the influence of operation condition and circumstance, the team improve the seawater booster pump outlet check valve from swing check valve to shuttle check valve which operate more appropriately in the system. By the test of continuous practice, we make further modification to the inner structure of shuttle check valve contrapuntally, and therefore we solve the problem in seawater booster pump outlet check valve fundamentally which has troubled the security of system operation in past years, so we realize the aim of technical improvement and ensure that the system operate in safety and stability. (authors)

  15. Laboratory Performance Evaluation of Residential Integrated Heat Pump Water Heaters

    Energy Technology Data Exchange (ETDEWEB)

    Sparn, B.; Hudon, K.; Christensen, D.

    2014-06-01

    This paper explores the laboratory performance of five integrated Heat Pump Water Heaters (HPWHs) across a wide range of operating conditions representative of U.S. climate regions. HPWHs are expected to provide significant energy savings in certain climate zones when compared to typical electric resistance water heaters. Results show that this technology is a viable option in most climates, but differences in control schemes and design features impact the performance of the units tested. Tests were conducted to map heat pump performance across the operating range and to determine the logic used to control the heat pump and the backup electric heaters. Other tests performed include two unique draw profile tests, reduced air flow performance tests and the standard DOE rating tests. The results from all these tests are presented here for all five units tested. The results of these tests will be used to improve the EnergyPlus heat pump water heater for use in BEopt™ whole-house building simulations.

  16. Laboratory Performance Evaluation of Residential Integrated Heat Pump Water Heaters

    Energy Technology Data Exchange (ETDEWEB)

    Sparn, B.; Hudon, K.; Christensen, D.

    2014-06-01

    This paper explores the laboratory performance of five integrated Heat Pump Water Heaters (HPWHs) across a wide range of operating conditions representative of US climate regions. HPWHs are expected to provide significant energy savings in certain climate zones when compared to typical electric resistance water heaters. Results show that this technology is a viable option in most climates, but differences in control schemes and design features impact the performance of the units tested. Tests were conducted to map heat pump performance across the operating range and to determine the logic used to control the heat pump and the backup electric heaters. Other tests performed include two unique draw profile tests, reduced air flow performance tests and the standard DOE rating tests. The results from all these tests are presented here for all five units tested. The results of these tests will be used to improve the EnergyPlus heat pump water heater for use in BEopt(tm) whole-house building simulations.

  17. Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Ela, E.; Kirby, B.; Botterud, A.; Milostan, C.; Krad, I.; Koritarov, V.

    2013-05-01

    The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purpose some solutions to those problems.

  18. Laboratory evaluation of the emulsifying characteristics of pumps. [Bilge and ballast water oily wastes

    Energy Technology Data Exchange (ETDEWEB)

    Harvey, A.C.; Guzdar, A.R.; Fiswell, D.R.

    1973-10-01

    The program was devoted to a laboratory investigation of the emulsifying characteristics of different pumps suitable for shipboard pumping of bilge and ballast water oily wastes. The tests were designed to investigate the effect of several parameters, such as oil type, input oil concentration, detergent, pump operating characteristics (pressure and flow rate), and salt versus fresh water, on emulsification. Tests were conducted on the Foster-Miller tests loop. No. 2 fuel oil, lubricating oil and No. 6 fuel oil were the oils tested at concentrations ranging from 1 to 10%. The oils were tested with and without the addition of 10% Gamlen D surfactant. The pumps used were a Parker Diaphragm pump, a Blackmer Sliding Vane pump, an Ingersoll Rand Centrifugal pump and a Deming Centrifugal pump. Pump pressure ranged from 10 to 60 psi and flow rate from 10 to 100 gpm. A total of 270 tests were conducted covering 198 different operating points, 108 concerning pump comparison, 54 concerning oil concentration and surfactant, and 45 concerning salt water.

  19. Preliminary assessment of pump IST effectiveness

    International Nuclear Information System (INIS)

    DiBiasio, A.; Grove, E.; Carbonaro, J.

    1994-01-01

    A preliminary review of Inservice Testing (IST) effectiveness for Code Class 1, 2, and 3 pumps at nuclear power plants was performed. IST requirements are specified by ASME Section XI, and the Operations and Maintenance Standard (OM Part 6). The INPO NPRDS database was used to provide failure reports for these components for 1988 to 1992. This time frame coincides with the issuance of Generic Letter 89-04, which resulted in a more consistent application of the requirements by the licensees. For this time period, 2585 pump failures were reported. A review of these failures indicated that the majority (71.6%) were due to external leakage, and were excluded from this study since these events typically do not affect pump operability and are not detected by the measurement of IST parameters. Of the remaining 733 events, a review was performed to identify the primary failure causes, failure modes, and method of detection. Plant testing programs, consisting of IST, surveillance testing, and special testing, detected approximately 40% of these occurrences. Others were detected through operational abnormalities, routine and incidental observations, alarms, and while performing maintenance. This paper provides a discussion of the results of the study

  20. Test Results From a Pair of 1-kWe Dual-Opposed Free-Piston Stirling Power Convertors Integrated With a Pumped NaK Loop

    Science.gov (United States)

    Geng, Steven M.; Briggs, Maxwell H.; Penswick, L. Barry; Pearson, J. Boise; Godfroy, Thomas J.

    2011-01-01

    As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1-kW-class free-piston Stirling convertors were modified to operate with a NaK (sodium (Na) and potassium (K)) liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The convertors were successfully tested at the Marshall Space Flight Center (MSFC) from June 6 through July 14, 2009. The convertors were operated for a total test time of 66 hr and 16 min. The tests included (a) performance mapping the convertors over various hot- and cold-end temperatures, piston amplitudes, and NaK flow rates and (b) transient test conditions to simulate various startup (i.e., low-, medium-, and high-temperature startups) and fault scenarios (i.e., loss of heat source, loss of NaK pump, convertor stall, etc.). This report documents the results of this testing

  1. Hydraulic optimization of 'S' characteristics of the pump-turbine for Xianju pumped storage plant

    International Nuclear Information System (INIS)

    Liu, W C; Zheng, J S; Cheng, J; Shi, Q H

    2012-01-01

    The pump-turbine with a rated power capacity of 375MW each at Xianju pumped storage plant is the most powerful one under construction in China. In order to avoid the instability near no-load conditions, the hydraulic design of the pump-turbine has been optimized to improving the 'S' characteristic in the development of the model pump-turbine. This paper presents the cause of 'S' characteristic of a pump-turbine by CFD simulation of the internal flow. Based on the CFD analysis, the hydraulic design optimization of the pump-turbine was carried out to eliminate the 'S' characteristics of the machine at Xianju pumped storage plant and a big step for removing the 'S' characteristic of a pump-turbine has been obtained. The model test results demonstrate that the pump-turbine designed for Xianju pumped storage plant can smoothly operate near no-load conditions without an addition of misaligned guide vanes.

  2. Accounting of possibilities of blade oscillation emergence at the calculation of operating wheel of turbomolecular vacuum pump

    International Nuclear Information System (INIS)

    Pereslavlev, A.V.

    1988-01-01

    Possibilities of blade oscillation emergence in the operating wheel of turbomolecular vacuum pump (TVP) are considered. Permissible value of safety factor for tensile strength in the operating wheel blade root section, at which the necessary fatigue limit of a material is provided for (k=2 for aluminium alloys and k=1.5 for VT-8 titanium alloy) is determined. Methods of calculating the main dimensions of blade operating wheel on the basis of the specified maximum pumping speed, taking account of possibilities of blade oscillation emergence are presented. Results of calculating the 4S max/πD 2 2 complex, characterizing maximum speed of operating wheel pumping, depending on permissible tensipn in the blade root section (σ), are given. It is shown that (σ increase above (2.5 2.7)x10 8 Pa for aluminium alloys and above ∼ 4x10 8 Pa for VT titanium alloy don't cause increase of operating wheel maximum pumping speed. 8 refs.; 6 figs

  3. Self Calibrating Flow Estimation in Waste Water Pumping Stations

    DEFF Research Database (Denmark)

    Kallesøe, Carsten Skovmose; Knudsen, Torben

    2016-01-01

    Knowledge about where waste water is flowing in waste water networks is essential to optimize the operation of the network pumping stations. However, installation of flow sensors is expensive and requires regular maintenance. This paper proposes an alternative approach where the pumps and the waste...... water pit are used for estimating both the inflow and the pump flow of the pumping station. Due to the nature of waste water, the waste water pumps are heavily affected by wear and tear. To compensate for the wear of the pumps, the pump parameters, used for the flow estimation, are automatically...... calibrated. This calibration is done based on data batches stored at each pump cycle, hence makes the approach a self calibrating system. The approach is tested on a pumping station operating in a real waste water network....

  4. Jet operated heat pump

    International Nuclear Information System (INIS)

    Collard, T.H.

    1982-01-01

    A jet pump system is shown that utilizes waste heat to provide heating and/or cooling. Waste heat diverted through a boiler causes a refrigerant to evaporate and expand for supersonic discharge through a nozzle thereby creating a vacuum in an evaporator coil. The vacuum draws the refrigerant in a gaseous state into a condensing section of a jet pump along with refrigerant from a reservoir in a subcooled liquid form. This causes condensation of the gas in a condensation section of the jet pump, while moving at constant velocity. The change in momentum of the fluid overcomes the system high side pressure. Some of the condensate is cooled by a subcooler. Refrigerant in a subcooled liquid state from the subcooler is fed back into the evaporator and the condensing section with an adequate supply being insured by the reservoir. The motive portion of the condensate is returned to the boiler sans subcooling. By proper valving start-up is insured, as well as the ability to switch from heating to cooling

  5. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  6. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  7. Acceptance for Beneficial Use Pumping Instrumentation and Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a final Acceptance for Beneficial Use (ABU) for Pumping and Instrumentation Control (PIC) skid ''L''. PIC skid ''L'' is ready for pumping tank U-105. All the testing and documentation has been completed as required on the ABU checklist. This ABU covers only the readiness of the PIC skid ''L''. Other U-farm preparations including dilution tank fabrication, portable exhauster readiness, leak detection, valve pit preparation, and the Operation Control Station readiness are not part of this ABU. PIC skid ''L'' is a new skid fabricated and tested at Site Fabrication Services. The skid controls the jet pump and monitors various instruments associated with the pumping operation. This monitoring includes leak detection along the waste transfer route and flammable gases in the pump pit

  8. Air-lift pumps characteristics under two-phase flow conditions

    International Nuclear Information System (INIS)

    Kassab, Sadek Z.; Kandil, Hamdy A.; Warda, Hassan A.; Ahmed, Wael H.

    2009-01-01

    Air-lift pumps are finding increasing use where pump reliability and low maintenance are required, where corrosive, abrasive, or radioactive fluids in nuclear applications must be handled and when a compressed air is readily available as a source of a renewable energy for water pumping applications. The objective of the present study is to evaluate the performance of a pump under predetermined operating conditions and to optimize the related parameters. For this purpose, an air-lift pump was designed and tested. Experiments were performed for nine submergence ratios, and three risers of different lengths with different air injection pressures. Moreover, the pump was tested under different two-phase flow patterns. A theoretical model is proposed in this study taking into account the flow patterns at the best efficiency range where the pump is operated. The present results showed that the pump capacity and efficiency are functions of the air mass flow rate, submergence ratio, and riser pipe length. The best efficiency range of the air-lift pumps operation was found to be in the slug and slug-churn flow regimes. The proposed model has been compared with experimental data and the most cited models available. The proposed model is in good agreement with experimental results and found to predict the liquid volumetric flux for different flow patterns including bubbly, slug and churn flow patterns

  9. Expert system for online surveillance of nuclear reactor coolant pumps

    International Nuclear Information System (INIS)

    Gross, K.C.; Singer, R.M.; Humenik, K.E.

    1993-01-01

    An expert system for determining the operability of a specified pump is described comprising: a set of pumps of which the specified pump is a member; means for measuring physical parameters representative to the operations condition each pump of said set of pumps; means for acquiring data generated by said measuring means; an artificial-intelligence based inference engine coupled to said data acquiring means where said inference engine applies a sequential probability ratio test to statistically evaluate said acquired data to determine a status for the specified pump and its respective measuring means by continually monitoring and comparing changes in a specific operational parameter signal acquired from a plurality of measurement means; means for transferring said status generated by said interference engine to an output system

  10. Association between elevated pre-operative glycosylated hemoglobin and post-operative infections after non-emergent surgery

    Directory of Open Access Journals (Sweden)

    Joseph M. Blankush

    2016-09-01

    Conclusions: The risk factors of post-operative infection are multiple and likely synergistic. While pre-operative HbA1c level is not independently associated with risk of post-operative infection, there are scenarios and patient subgroups where pre-operative HbA1c is useful in predicting an increased risk of infectious complications in the post-operative period.

  11. Combined pump and marking tests for determining protection zones

    Energy Technology Data Exchange (ETDEWEB)

    Hoetzl, H.; Brauns, J.

    1982-02-01

    Under difficult conditions the determination of the protection area II on the basis of Mear pump tests becomes uncertain. The report shows how in such cases the results of supplementary marking tests can establish a more accurate finding. The execution of combined pump and marking tests enables us to check data gained on a theoretical basis and possibly alter these. This method is described in an example, in which certain hydrogeological conditions and rival interests of ground water protection prevail on the one side and utilization of land on the other side. A general tendency exists to take the utmost protective measure in safeguarding ground water, however in cases of collision of interests the boundary of the protective area should be optimized. Supplementary marking tests can be of great significance.

  12. NERATOOM work on pump development

    International Nuclear Information System (INIS)

    Hoornweg, C.J.

    1976-01-01

    The prototype pump has been manufactured by Stork Engineerings Works at Hengelo in 1969. The full-scale test on water has been carried out as part of the procedures of acceptance. Tests on sodium have been carried out in the pumptestfacility of Interatom at Bensberg (W. Germany); these tests started in March 1971 and were finished in October 1972. During that period nearly 6000 hours of pump testing were accomplished, of which 150 hours the pump was subjected to cavitation. During 30 hours the pump was subjected to a cavitation intensity of more than 3% loss of delivery head. At some occasions the loss of delivery head was 7%. The measured NPSH with the tests on sodium was 10m, whereas the NPSH obtained with the tests on water was 9m. Attempts have been made to account for this difference of NPSH-setting on the two liquids concerned. At the end of the tests on sodium (that is after the excecution of the cavitation tests) the delivery head of the pump was 2 m.l.c. less than the rated value. After dismantling the pump it appeared that the surface of the impeller vanes was roughened, especially at those parts where the original sand cast surface had not been polished. Based on the testresults and not being contradicted by calculation-results so far, our opinion is that cavitation in sodium of reactor temperature (550 0 C) most probably is of the same order of magnitude as it is in water of roomtemperature under the same conditions of NPSH, provided the same pump operates in systems that are exact replica of one another

  13. Pump cavitation and inducer design

    International Nuclear Information System (INIS)

    Heslenfeld, M.W.; Hes, M. de

    2002-01-01

    Details of past work on sodium pump development and cavitation studies executed mainly for SNR 300 were reported earlier. Among the requirements for large sodium pumps are long life (200000 hours up to 300000 hours) and small size of impeller and pump, fully meeting the process and design criteria. These criteria are the required 'Q, H, r characteristics' in combination with a low NPSH value and the avoidance of cavitation damage to the pump. The pump designer has to develop a sound hydraulic combination consisting of suction arrangement, impeller design and diffuser. On the other hand the designer is free to choose an optimal pump speed. The pump speed in its turn influences the rotor dynamic pump design and the pump drive. The introduction of the inducer as an integral part of the pump design is based on following advantages: no tip cavitation; (possible) cavitation bubbles move to the open centre due to centrifugal forces on the fluid; the head of the inducer improves the inlet conditions of the impeller. The aim of an inducer is the increase in the suction specific speed (SA value) of a pump whereby the inducer functions as a pressure source improving the impeller inlet conditions. With inducer-impeller combinations values up to SA=15000 are realistic. With the use of an inducer the overall pump sizes can be reduced with Ca. 30%. Pumps commonly available have SA values up to a maximum of ca. 10000. A development programme was executed for SNR 300 in order to reach an increase of the suction specific speed of the impeller from SA 8200 to SA 11000. Further studies to optimize pumps design for the follow up line introduced the 'inducer acting as a pre-impeller' development. This programme was executed in the period 1979-1981. At the FDO premises a scale 1 2.8 inducer impeller combination with a suction specific speed SA=15000 was developed, constructed and tested at the water test rig. This water test rig is equipped with a perspex pipe allowing also visualisation

  14. Pre- and post-operative values of serum CRP in patients undergoing surgery for brain tumour

    International Nuclear Information System (INIS)

    Syeda, T.; Rizvi, H.A.; Hashim, A.S.

    2014-01-01

    Objective: To determine the concentration of C-reactive protein in pre- and post-operative serum samples of brain tumour patients in order to detect the potential risks of post-operative infections. Methods: Serum C-reactive protein was measured on pre- and post-operative Day 1, Day 2 and Day 7 in 18 patients who underwent surgery for brain tumours. The study was performed at the Neurosurgical Ward, Jinnah Postgraduate Medical Centre, Karachi, from May 2007 to April 2008. Mean pre-operative patients and control values were compared using Mann-Whitney or Wilcoxon tests for comparing between pre- and post-operative values. P-value was considered significant at 5.0mg/L but no statistically significant difference was found when compared with healthy controls, with mean 4.4+-6.6 and 0.9+-0.7, respectively. Significantly raised serum concentrations were observed in all post-operative samples when compared with pre-operative samples. Serum CRP concentrations significantly increased post-operatively on Day 1, with mean value of 102.9+-82.0mg/L (p<0.0005), and further increased on Day 2 with mean value of 166.9+-128.1mg/L (p<0.0005), but declined on Day 7, with mean value of 42.7+-63.6mg/L (p<0.005). Conclusion: Pre-operative serum C-reactive protein concentrations of 28% of the patients were elevated, suggesting an association with brain tumours. Post-operative serum concentrations were significantly higher than those noted before the surgery. Absence of a fall of concentration from peak value on post-operative Day 2 or a secondary rise from post-operative Day 7 could be alarming for inter-current infection. (author)

  15. Test specification for decant pump and winch assembly

    International Nuclear Information System (INIS)

    Staehr, T.W.

    1994-01-01

    This specification provides the requirements for testing of the vertical turbine decant pump including the floating suction arm with load sensing winch control, instrumentation and the associated PLC/PC control system

  16. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  17. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  18. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  19. Multi-objective optimization of water quality, pumps operation, and storage sizing of water distribution systems.

    Science.gov (United States)

    Kurek, Wojciech; Ostfeld, Avi

    2013-01-30

    A multi-objective methodology utilizing the Strength Pareto Evolutionary Algorithm (SPEA2) linked to EPANET for trading-off pumping costs, water quality, and tanks sizing of water distribution systems is developed and demonstrated. The model integrates variable speed pumps for modeling the pumps operation, two water quality objectives (one based on chlorine disinfectant concentrations and one on water age), and tanks sizing cost which are assumed to vary with location and diameter. The water distribution system is subject to extended period simulations, variable energy tariffs, Kirchhoff's laws 1 and 2 for continuity of flow and pressure, tanks water level closure constraints, and storage-reliability requirements. EPANET Example 3 is employed for demonstrating the methodology on two multi-objective models, which differ in the imposed water quality objective (i.e., either with disinfectant or water age considerations). Three-fold Pareto optimal fronts are presented. Sensitivity analysis on the storage-reliability constraint, its influence on pumping cost, water quality, and tank sizing are explored. The contribution of this study is in tailoring design (tank sizing), pumps operational costs, water quality of two types, and reliability through residual storage requirements, in a single multi-objective framework. The model was found to be stable in generating multi-objective three-fold Pareto fronts, while producing explainable engineering outcomes. The model can be used as a decision tool for both pumps operation, water quality, required storage for reliability considerations, and tank sizing decision-making. Copyright © 2012 Elsevier Ltd. All rights reserved.

  20. Preliminary assessment of pump IST effectiveness

    International Nuclear Information System (INIS)

    DiBiasio, A.; Grove, E.; Carbonaro, J.

    1994-01-01

    A preliminary review of inservice testing (IST) effectiveness for Class 1, 2, and 3 pumps at nuclear power plants was performed. IST requirements are specified by the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, and the Operations and Maintenance Standard (OM Part 6). The Institute of Nuclear Power Operations Nuclear Plant Reliability Data System was used to provide failure reports for these components from 1988 to 1992. This time frame coincides with the issuance of Generic Letter 89-04, which resulted in a more consistent application of the requirements by the licensees. For this time, 2,585 pump failures were reported. A review of these failures indicated that the majority (71.6%) resulted from external leakage. These events were excluded from the study because the typically do not affect pump operability and are not detected by the measurement of IST parameters. The remaining 733 events were reviewed to identify the primary failure causes, failure modes, and method of detection. Plant testing programs, consisting of IST, surveillance testing, detected approximately 40% of these occurrences. Others were detected through operational abnormalities, routine and incidental observations, alarms, and while performing maintenance. This paper discusses the results of the study

  1. Flow pumping system for physiological waveforms.

    Science.gov (United States)

    Tsai, William; Savaş, Omer

    2010-02-01

    A pulsatile flow pumping system is developed to replicate flow waveforms with reasonable accuracy for experiments simulating physiological blood flows at numerous points in the body. The system divides the task of flow waveform generation between two pumps: a gear pump generates the mean component and a piston pump generates the oscillatory component. The system is driven by two programmable servo controllers. The frequency response of the system is used to characterize its operation. The system has been successfully tested in vascular flow experiments where sinusoidal, carotid, and coronary flow waveforms are replicated.

  2. Main-coolant-pump shaft-seal guidelines. Volume 2. Operational guidelines. Final report

    International Nuclear Information System (INIS)

    Fair, C.E.; Greer, A.O.

    1983-03-01

    This report presents a set of guidelines and criteria for improving main coolant pump shaft seal operational reliability. The noted guidelines are developed from EPRI sponsored nuclear power plant seal operating experience studies. Usage procedures/practices and operational environment influence on seal life and reliability from the most recent such survey are summarized. The shaft seal and its auxiliary supporting systems are discussed both from technical and operational related viewpoints

  3. Premedication with gabapentin, alprazolam or a placebo for abdominal hysterectomy: Effect on pre-operative anxiety, post-operative pain and morphine consumption

    Directory of Open Access Journals (Sweden)

    Tim Thomas Joseph

    2014-01-01

    Full Text Available Background and Aims : Utility of gabapentin for pre-operative anxiolysis as compared to commonly administered alprazolam is not evident. The aim of the present study was to compare the effects of pre-operative oral gabapentin 600 mg, alprazolam 0.5 mg or a placebo on pre-operative anxiety along with post-operative pain and morphine consumption. Methods: Seventy five patients scheduled for abdominal hysterectomy under general anaesthesia were included. Groups gabapentin, alprazolam and placebo, received oral gabapentin 600 mg, alprazolam 0.5 mg and one capsule of oral B-complex forte with Vitamin C respectively, on the night prior to surgery and 2 h prior to surgery. Visual analogue scale (VAS was used to measure the anxiety and post-operative pain. All patients received patient-controlled analgesia. Statistical tests used were Kruskal-Wallis test, Wilcoxon signed rank test and one-way ANOVA. Results: Alprazolam provided significant anxiolysis (median [interquartile range] baseline VAS score 35 [15.5, 52] to 20 [6.5, 34.5] after drug administration; P = 0.007. Gabapentin did not provide significant decrease in anxiety (median [interquartile range] VAS score 21 [7.5, 41] to 20 [6.5, 34.5]; P = 0.782. First analgesic request time (median [interquartile range in minutes] was longer in group gabapentin (17.5 [10, 41.25] compared to group placebo (10 [5, 15] (P = 0.019 but comparable to that in group alprazolam (15 [10, 30]. Cumulative morphine consumption at different time periods and total morphine consumption (mean [standard deviation] at the end of study period (38.65 [18.04], 39.91 [15.73], 44.29 [16.02] mg in group gabapentin, alprazolam and placebo respectively were comparable. Conclusion: Gabapentin 600 mg does not have significant anxiolytic effect compared to alprazolam 0.5 mg. Alprazolam 0.5 mg was found to be an effective anxiolytic in the pre-operative period. Neither alprazolam nor gabapentin, when compared to placebo showed any opioid

  4. The replacement of an electromagnetic primary sodium sampling pump in the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Grygiel, M.L.; McCargar, C.G.

    1985-01-01

    On November 16, 1984 a leak was discovered in one of the Fast Flux Test Facility (FFTF) Primary Sodium Sampling System electromagnetic pumps. The leak was discovered in the course of routine cell entry to investigate a shorted trace heat element. The purpose of this paper is to describe the circumstances surrounding the occurrence of the leak, the actions taken to replace the damaged pump and the additional steps which were necessary to return the plant to power. In addition, the processes involved in producing the leak are described briefly. The relative ease of recovery from this incident is indicative of the overall feasibility of the Liquid Metal Reactor (LMR) operational concept

  5. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  6. Application Research on Testing Efficiency of Main Drainage Pump in Coal Mine Using Thermodynamic Theories

    Directory of Open Access Journals (Sweden)

    Deyong Shang

    2017-01-01

    Full Text Available The efficiency of a drainage pump should be tested at regular intervals to master the status of the drainage pump in real time and thus achieve the goal of saving energy. The ultrasonic flowmeter method is traditionally used to measure the flow of the pump. But there are some defects in this kind of method of underground coal mine. This paper first introduces the principle of testing the main drainage pump efficiency in coal mine using thermodynamic theories, then analyzes the energy transformation during the process of draining water, and finally derives the calculation formulae of the pump efficiency, which meet the on-site precision of engineering. On the basis of analyzing the theories, the protective sleeve and the base of the temperature sensor are designed to measure the water temperature at inlet and outlet of the pump. The efficiencies of pumps with two specifications are measured, respectively, by using the thermodynamic method and ultrasonic flowmeter method. By contrast, the results show that thermodynamic method can satisfy the precision of the testing requirements accuracy for high-flow and high-lift drainage pump under normal temperatures. Moreover, some measures are summed up to improve the accuracy of testing the pump efficiency, which are of guiding significance for on-site testing of the main drainage pump efficiency in coal mine.

  7. 77 FR 8178 - Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting

    Science.gov (United States)

    2012-02-14

    .... EERE-2010-BT-TP-0038] Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting... methodologies and gather comments on testing residential central air conditioners and heat pumps designed to use... residential central air conditioners and heat pumps that are single phase with rated cooling capacities less...

  8. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  9. Long-term pumping test in borehole KR24 flow measurements

    Energy Technology Data Exchange (ETDEWEB)

    Rouhiainen, P.; Poellaenen, J. [PRG-Tec Oy, Espoo (Finland)

    2005-09-15

    The Difference Flow method can be used for the relatively fast determination of transmissivity and hydraulic head in fractures or fractured zones in cored boreholes. In this study, the Difference Flow method was used for hydraulic crosshole interference tests. The tests were performed in boreholes KR24 (pumped borehole) KR4, KR7, KR8, KRlO, KR14, KR22, KR22B, KR26, KR27, KR27B, KR28 and KR28B at Olkiluoto during the first and second quarters of 2004. The distance between the boreholes varies from approximately tens of meters to hundreds of meters. All the measurements were carried out in open boreholes, i.e. no packers were used. For interpretation, a normal single hole test was first performed in each borehole. Flow rates and drawdown were first measured both without pumping and with pumping the borehole under test. For practical reasons, the data set is neither complete nor similar in all tested boreholes. Connected flow to borehole KR24 was detected in all these boreholes. These flow responses were concentrated on a few zones. (orig.)

  10. Effect of operating conditions on the performance of the bubble pump of absorption-diffusion refrigeration cycles

    Directory of Open Access Journals (Sweden)

    Benhmidene Ali

    2011-01-01

    Full Text Available The mathematical model will be able to predict the operated condition (required tube diameters, heat input and submergence ratio….. That will result in a successful bubble pump design and hence a refrigeration unit. In the present work a one-dimensional two-fluid model of boiling mixing ammonia-water under constant heat flux is developed. The present model is used to predict the outlet liquid and vapor velocities and pumping ratio for different heat flux input to pump. The influence of operated conditions such as: ammonia fraction in inlet solution and tube diameter on the functioning of the bubble pump is presented and discussed. It was found that, the liquid velocity and pumping ratio increase with increasing heat flux, and then it decreases. Optimal heat flux depends namely on tube diameter variations. Vapour velocity increases linearly with increasing heat flux under designed conditions.

  11. Hardware and software system for monitoring oil pump operation in power high-voltage transformers

    Directory of Open Access Journals (Sweden)

    Михайло Дмитрович Дяченко

    2017-07-01

    Full Text Available The article considers the basic prerequisites for the creation of an automated monitoring system for oil pumps of high-voltage transformers. This is due to the fact that the long operation of oil pumps results in deterioration and destruction of bearings, rubbing of the rotor, breakage and damage to the impeller, leakage, etc., which inevitably causes a significant decrease in the insulating properties of the transformer oil and leads to expenditures for its further recovery. False triggerings of gas protection sometimes occur. Continuous operation of the electric motor also requires additional equipment to protect the motor itself from various emergency situations, such as a short in the stator winding, a housing breakdown, an incomplete phase mode, etc. The use of stationary systems provides: diagnosing defects at an early stage of their development, increasing the reliability and longevity of the equipment components, increasing the overhaul period, decreasing the number of emergency stops, and adjusting the schedule of preventative maintenance. The basic principles of identification of the damaged part of the oil pump are given, the hardware and algorithmic solutions are considered in the work. The full-scale tests of the model sample on the power transformer of the high-voltage substation confirmed the assumption of the possibility of detecting the damaged unit separating it from the rest connected in one mechanical structure. A detailed analysis of the operation of each of the units is carried out by means of the general substation switchboard and displayed as graphs, diagrams and text messages. When the limit values of vibration are reached, faults in the operation of the unit are detected, the overlimit current values, a warning alarm is activated, and the command to disconnect the damaged unit is issued. The optimal solution for the organization of the information collection system using the principle of sensor networks, but combined

  12. Sol-Gel Based Polybenzimidazole Membranes for Hydrogen Pumping Devices

    Energy Technology Data Exchange (ETDEWEB)

    Benicewicz, Brian C. [Rensselaer Polytechnic Institute, Troy, NY (United States). Department of Chemistry and Chemical Biology; Eisman, Glenn A. [Rensselaer Polytechnic Institute, Troy, NY (United States). Department of Materials Science and Engineering; Kumar, S. K. [Columbia Univ., New York, NY (United States). Department of Chemical Engineering; Greenbaum, S. G. [Hunter College, New York, NY (United States). Department of Physics

    2014-02-26

    Electrochemical hydrogen pumping using a high temperature (>100°C) PBI membrane was demonstrated under non-humidified and humidified conditions at ambient pressures. Relatively low voltages were required to operate the pump over a wide range of hydrogen flow rates. The advantages of the high temperature capability were shown by operating the pump on reformate feed gas mixtures containing various amounts of CO and CO2. Gas purity measurements on the cathode gas product were conducted and significant reductions in gas impurities were detected. The applicability of the PBI membrane for electrochemical hydrogen pumping and its durability under typical operating conditions was established with tests that lasted for nearly 4000 hours.

  13. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  14. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  15. ITER primary cryopump test facility

    International Nuclear Information System (INIS)

    Petersohn, N.; Mack, A.; Boissin, J.C.; Murdoc, D.

    1998-01-01

    A cryopump as ITER primary vacuum pump is being developed at FZK under the European fusion technology programme. The ITER vacuum system comprises of 16 cryopumps operating in a cyclic mode which fulfills the vacuum requirements in all ITER operation modes. Prior to the construction of a prototype cryopump, the concept is tested on a reduced scale model pump. To test the model pump, the TIMO facility is being built at FZK in which the model pump operation under ITER environmental conditions, except for tritium exposure, neutron irradiation and magnetic fields, can be simulated. The TIMO facility mainly consists of a test vessel for ITER divertor duct simulation, a 600 W refrigerator system supplying helium in the 5 K stage and a 30 kW helium supply system for the 80 K stage. The model pump test programme will be performed with regard to the pumping performance and cryogenic operation of the pump. The results of the model pump testing will lead to the design of the full scale ITER cryopump. (orig.)

  16. An experimental investigation of pump as turbine for micro hydro application

    International Nuclear Information System (INIS)

    Raman, N; Hussein, I; Palanisamy, K; Foo, B

    2013-01-01

    This paper presents the results of an experimental investigation of a centrifugal pump working as turbine (PAT). An end suction centrifugal pump was tested in turbine mode at PAT experimental rig installed in the Mechanical Engineering Laboratory of Universiti Tenaga Nasional. The pump with specific speed of 15.36 (m, m 3 /s) was used in the experiment and the performance characteristic of the PAT was determined. The experiment showed that a centrifugal pump can satisfactorily be operated as turbine without any mechanical problems. As compared to pump operation, the pump was found to operate at higher heads and discharge values in turbine mode. The best efficiency point (BEP) in turbine mode was found to be lower than BEP in pump mode. The results obtained were also compared to the work of some previous researchers.

  17. Impact of typical steady-state conditions and transient conditions on flow ripple and its test accuracy for axial piston pump

    Science.gov (United States)

    Xu, Bing; Hu, Min; Zhang, Junhui

    2015-09-01

    The current research about the flow ripple of axial piston pump mainly focuses on the effect of the structure of parts on the flow ripple. Therein, the structure of parts are usually designed and optimized at rated working conditions. However, the pump usually has to work in large-scale and time-variant working conditions. Therefore, the flow ripple characteristics of pump and analysis for its test accuracy with respect to variant steady-state conditions and transient conditions in a wide range of operating parameters are focused in this paper. First, a simulation model has been constructed, which takes the kinematics of oil film within friction pairs into account for higher accuracy. Afterwards, a test bed which adopts Secondary Source Method is built to verify the model. The simulation and tests results show that the angular position of the piston, corresponding to the position where the peak flow ripple is produced, varies with the different pressure. The pulsating amplitude and pulsation rate of flow ripple increase with the rise of pressure and the variation rate of pressure. For the pump working at a constant speed, the flow pulsation rate decreases dramatically with the increasing speed when the speed is less than 27.78% of the maximum speed, subsequently presents a small decrease tendency with the speed further increasing. With the rise of the variation rate of speed, the pulsating amplitude and pulsation rate of flow ripple increase. As the swash plate angle augments, the pulsating amplitude of flow ripple increases, nevertheless the flow pulsation rate decreases. In contrast with the effect of the variation of pressure, the test accuracy of flow ripple is more sensitive to the variation of speed. It makes the test accuracy above 96.20% available for the pulsating amplitude of pressure deviating within a range of ±6% from the mean pressure. However, with a variation of speed deviating within a range of ±2% from the mean speed, the attainable test

  18. Implementation of Pre-Operative Checklist: An Effort to Reduce ...

    African Journals Online (AJOL)

    Implementation of Pre-Operative Checklist: An Effort to Reduce Delays in. Surgery and ... insight to develop a pre-operative checklist to ensure that patients were prepared for surgery and to minimize disruptions ... documentation audit was conducted in May 2014, showing 59% compliance in completing the checklist. Since.

  19. Pump Application as Hydraulic Turbine – Pump as Turbine (PaT)

    OpenAIRE

    Rusovs, D

    2009-01-01

    The paper considers pump operation as hydraulic turbine with purpose to produce mechanical power from liquid flow. The Francis hydraulic turbine was selected for comparison with centrifugal pump in reverse operation. Turbine and centrifugal pump velocity triangles were considered with purpose to evaluate PaT efficiency. Shape of impeller blades for turbine and pumps was analysed. Specific speed calculation is carried out with purpose to obtain similarity in pump and turbine description. For ...

  20. Evaluation of advanced turbomachinery for underground pumped hydroelectric storage. Part 3. Multistage unregulated pump/turbines for operating heads of 1000 to 1500 m

    Energy Technology Data Exchange (ETDEWEB)

    Frigo, A.A.; Pistner, C.

    1980-08-01

    This is the final report in a series of three on studies of advanced hydraulic turbomachinery for underground pumped hydroelectric storage. All three reports address Francis-type, reversible pump/turbines. The first report covered single-stage regulated units; the second report covered two-stage regulated units; the present report covers multistage unregulated units. Multistage unregulated pump/turbines offer an economically attractive option for heads of 1000 to 1500 m. The feasibility of developing such machines for capacities up to 500 MW and operating heads up to 1500 m has been evaluated. Preliminary designs have been generated for six multistage pump/turbines. The designs are for nominal capacities of 350 and 500 MW and for operating heads of 1000, 1250, and 1500 m. Mechanical, hydraulic, and economic analyses indicate that these machines will behave according to the criteria used to design them and that they can be built at a reasonable cost with no unsolvable problems. Efficiencies of 85.8% and 88.5% in the generating and pumping modes, respectively, can be expected for the 500-MW, 1500-m unit. Performances of the other five machines are at least comparable, and usually better. Over a 1000 to 1500-m head range, specific $/kW costs of the pump/turbines in mid-1978 US dollars vary from 19.0 to 23.1 for the 500-MW machines, and from 21.0 to 24.1 for the 350-MW machines.

  1. Study on cavitation in centrifugal sodium pumps for FBTR and PFBR

    International Nuclear Information System (INIS)

    Rao, A.S.L.K.; Prabhakar, R.; Prakash, V.; Paranjpe, S.R.

    2002-01-01

    Fast Breeder Test Reactor (FBTR) which is expected to become critical shortly is a loop type reactor of 40 MW thermal capacity and has two primary and two secondary centrifugal pumps for heat removal. During the initial periods of reactor operation, the steam generator is bypassed and the secondary sodium pumps are required to operate at flows less than that at best efficiency point. This paper deals with the cavitation problems associated with operation at partial f lows, theoretical estimations and experimental cavitation measurements carried out on FBTR secondary sodium pumps. These investigations revealed that operation of FBTR pumps at this off design condition is free from cavitation damage. Cavitation experiments on a model pump for the development of large sodium pumps for a 500 MWe Prototype Fast Breeder Reactor (PFBR) are described in this paper

  2. Experimental study on hydraulic characteristic around trash rack of a pumping station

    Science.gov (United States)

    Zhou, MinZhe; Li, TongChun; Lin, XiangYang; Liu, XiaoQing; Ding, Yuan; Liu, GuangYuan

    2017-11-01

    This paper focuses on flow pattern around trash rack of intake of a pumping station project. This pumping station undertake the task of supplying up to 3,500,000 m3 water per day for a megacity. Considering the large flow rate, high lift, multi-pipe supply and long-time operation in this water conveyance pumping station, we built a physical model test to measure the flow velocity and observe the flow pattern to verify the reasonability of preliminary design. In this test, we set 3 layers of current meters around each trash rack of intake in reservoir to collect the flow velocity. Furthermore, we design 2 operating conditions of 9 pumps to observe the change of flow pattern. Finally, we found the velocity data were in a normal range under 2 different operating conditions of the 9 pump units.

  3. High reliability flow system - an assessment of pump reliability and optimisation of the number of pumps

    International Nuclear Information System (INIS)

    Butterfield, J.M.

    1981-01-01

    A system is considered where a number of pumps operate in parallel. Normally, all pumps operate, driven by main motors fed from the grid. Each pump has a pony motor fed from an individual battery supply. Each pony motor is normally running, but not engaged to the pump shaft. On demand, e.g. failure of grid supplies, each pony motor is designed to clutch-in automatically when the pump speed falls to a specified value. The probability of all the pony motors failing to clutch-in on demand must be demonstrated with 95% confidence to be less than 10 -8 per demand. This assessment considers how the required reliability of pony motor drives might be demonstrated in practice and the implications on choice of the number of pumps at the design stage. The assessment recognises that not only must the system prove to be extremely reliable, but that demonstration that reliability is adequate must be done during plant commissioning, with practical limits on the amount of testing performed. It is concluded that a minimum of eight pony motors should be provided, eight pumps each with one pony motor (preferred) or five pumps each with two independent pony motors. A minimum of two diverse pony motor systems should be provided. (author)

  4. The Influence of RSG-GAS Primary Pump Operation Concerning the Rise Water Level of Reactor Pool in 15 MW Reactor Power

    International Nuclear Information System (INIS)

    Djunaidi

    2004-01-01

    The expansion of air volume in the delay chamber shows in rise water level of reactor pool during the operation. The rises of water level in the reactor pool is not quite from the expansion of air volume in the delay chamber, but some influence the primary pump operation. The purpose evaluated of influence primary pump is to know the influence primary pump power concerning the rise water level during the reactor operation. From the data collection during 15 MW power operation in the last core 42 the influence of primary pump operation concerning the rise water level in the reactor pool is 34.48 % from the total increased after operation during 12 days. (author)

  5. Development of advanced heat pump (2). Prelimirary test of two-stage compression heat pump. Koseino onreinetsu kyokyu heat pump system no kaihatsu. Dai 2 ho 2dan attsusyuku system shisakuki no yobi jikken kekka

    Energy Technology Data Exchange (ETDEWEB)

    Iwatsubo, Tetsushiro; Saikawa, Michinori; Hamamatsu, Teruhide

    1988-03-01

    A heat pump driven by electricity is one of the excellent electricity utilization systems and is promoted to be widely used. An advanced heat pump has been investigated to enlarge its applications in the field of hot water supply for domestic use which will be competitive with city gas and air conditioning in large scale buildings. An experimental unit with two-stage compression system was designed, which has the multi-function of air conditioning and hot water supply, and the trial system was fabricated. In the design, followings were considered; cooperative operations of two compressors by inverter driving, the temperature conditions of both the air for the air conditioning and the heat source, additional setting of the intermediate heat exchanger. The test operation was carried out with checking the start up procedure, the control sequence and so on. The probability of five operation modes: cooling, heating, hot water supply, cooling/hot water supply, and heating/hot water supply, were confirmed. In the mode of heating/hot water supply the hot water temperature was increased to 65/sup 0/C, the excellent performance in hot water supply was demonstrated. (21 figs, 8 tabs, 1 photo, 5 refs)

  6. Part-load operation of the boiler feedwater pumps for the new French PWR 1400 MW nuclear plants - a challenge for the designer

    International Nuclear Information System (INIS)

    Martin, R.; Canavelis, R.; Guilloiseau, P.

    1988-01-01

    The Boiler feedwater pumps in Electricite de France Power Stations have to work reliably for all flow rates between 33% and 134% of the flow corresponding to the best efficiency point (Q BEP ). Under transient conditions associated with load changing these limits increase to 33% to 147% Q BEP . Due to the high specific power of these pumps, the operating conditions heavily influence the hydraulic and mechanical dimensioning. This paper presents some particular aspects of their design and test results obtained on a pump model as well as on a full scale prototype concerning suction performance, head capacity curve stability, pressure pulsations and structural excitations. (author)

  7. Pumping station design for a pumped-storage wind-hydro power plant

    International Nuclear Information System (INIS)

    Anagnostopoulos, John S.; Papantonis, Dimitris E.

    2007-01-01

    This work presents a numerical study of the optimum sizing and design of a pumping station unit in a hybrid wind-hydro plant. The standard design that consists of a number of identical pumps operating in parallel is examined in comparison with two other configurations, using one variable-speed pump or an additional set of smaller jockey pumps. The aim is to reduce the amount of the wind generated energy that cannot be transformed to hydraulic energy due to power operation limits of the pumps and the resulting step-wise operation of the pumping station. The plant operation for a period of one year is simulated by a comprehensive evaluation algorithm, which also performs a detailed economic analysis of the plant using dynamic evaluation methods. A preliminary study of the entire plant sizing is carried out at first using an optimization tool based on evolutionary algorithms. The performance of the three examined pumping station units is then computed and analyzed in a comparative study. The results reveal that the use of a variable-speed pump constitutes the most effective and profitable solution, and its superiority is more pronounced for less dispersed wind power potential

  8. Test quality

    International Nuclear Information System (INIS)

    Hartley, R.S.; Keller, A.E.

    1992-01-01

    Inservice testing of safety-related components at nuclear power plants is performed under the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (the Code). Subsections IWP and IWV of Section 11 of the Code state test method and frequency requirements for pumps and valves, respectively. Tests vary greatly in quality and frequency. This paper explores the concept of test quality and its relationship with operational readiness and preventive maintenance. This paper also considers the frequencies of component testing. Test quality is related to a test's ability to detect degradation that can cause component failure. The quality of the test depends on several factors, including specific parameters measured, system or component conditions, and instrument accuracy. The quality of some currently required tests for check valves, motor-operated valves, and pumps is also discussed. Suggestions are made to improve test quality by measuring different parameters, testing valves under load, and testing positive displacement pumps at high pressure and centrifugal pumps at high flow rate conditions. These suggestions can help to improve the level of assurance of component operational readiness gained from testing

  9. Microscale Thermal-Transpiration Gas Pump

    Science.gov (United States)

    Vargo, Stephen; Muntz, Phillip; Shiflett, Geoff

    2003-01-01

    A recent addition to the growing class of microelectromechanical systems (MEMS) is a single stage of a Knudsen compressor. This device was fabricated and tested to demonstrate the feasibility of Knudsen compressors as miniature vacuum pumps for future portable scientific instruments. The attributes of Knudsen compressors that make them attractive as miniature vacuum pumps are that they contain no moving parts and operate without need for lubricants or working fluids.

  10. Pre-operative skin preparation practices: results of the 2007 French national assessment.

    Science.gov (United States)

    Borgey, F; Thibon, P; Ertzscheid, M-A; Bernet, C; Gautier, C; Mourens, C; Bettinger, A; Aggoune, M; Galy, E; Lejeune, B; Kadi, Z

    2012-05-01

    Pre-operative skin preparation, aimed at reducing the endogenous microbial flora, is one of the main preventive measures employed to decrease the likelihood of surgical site infection. National recommendations on pre-operative management of infection risks were issued in France in 2004. To assess compliance with the French national guidelines for pre-operative skin preparation in 2007. A prospective audit was undertaken in French hospitals through interviews with patients and staff, and observation of professional practice. Compliance with five major criteria selected from the guidelines was studied: patient information, pre-operative showering, pre-operative hair removal, surgical site disinfection and documentation of these procedures. Data for 41,188 patients from all specialties at 609 facilities were analysed. Patients were issued with information about pre-operative showering in 88.2% of cases [95% confidence interval (CI) 87.9-88.5]. The recommended procedure for pre-operative showering, including hairwashing, with an antiseptic skin wash solution was followed by 70.3% of patients (95% CI 69.9-70.8); this percentage was higher when patients had received appropriate information (P pre-operative surgical hygiene, 82.3% of cases; and pre-operative site disinfection, 71.7% of cases. The essential content of the French guidelines seems to be understood, but reminders need to be issued. Some recommendations may need to be adapted for certain specialties. Copyright © 2012 The Healthcare Infection Society. Published by Elsevier Ltd. All rights reserved.

  11. Simultaneous Imbalance Reduction and Peak Shaving using a Field Operational Virtual Power Plant with Pumps

    NARCIS (Netherlands)

    Pruissen, O.P. van; Kok, J.K.; Eisma, A.

    2015-01-01

    The Dutch electricity infrastructure is challenged by the deployment of large numbers of heat pumps in newly-built domestic residences. An example is the apartment complex of Couperus in The Hague where 300 apartments are heated by individual heat pumps. This building was operated as a Virtual Power

  12. Association between elevated pre-operative glycosylated hemoglobin and post-operative infections after non-emergent surgery.

    Science.gov (United States)

    Blankush, Joseph M; Leitman, I Michael; Soleiman, Aron; Tran, Trung

    2016-09-01

    A chronic state of impaired glucose metabolism affects multiple components of the immune system, possibly leading to an increased incidence of post-operative infections. Such infections increase morbidity, length of stay, and overall cost. This study evaluates the correlation between elevated pre-operative glycosylated hemoglobin (HbA1c) and post-operative infections. Adult patients undergoing non-emergent procedures across all surgical subspecialties from January 2010 to July 2014 had a preoperative HbA1c measured as part of their routine pre-surgical assessment. 2200 patient charts (1100 operative infection (superficial surgical site infection, deep wound/surgical space abscess, pneumonia, and/or urinary tract infection as defined by Centers for Disease Control criteria) within 30 days of surgery. Patients with HbA1c infection rate (3.8% in the HbA1c infection. Elevated HbA1c was, however, predictive of significantly increased risk of post-operative infection when associated with increased age (≥81 years of age) or dirty wounds. The risk factors of post-operative infection are multiple and likely synergistic. While pre-operative HbA1c level is not independently associated with risk of post-operative infection, there are scenarios and patient subgroups where pre-operative HbA1c is useful in predicting an increased risk of infectious complications in the post-operative period.

  13. Study of Hydrogen Pumping through Condensed Argon in Cryogenic pump

    International Nuclear Information System (INIS)

    Jadeja, K A; Bhatt, S B

    2012-01-01

    In ultra high vacuum (UHV) range, hydrogen is a dominant residual gas in vacuum chamber. Hydrogen, being light gas, pumping of hydrogen in this vacuum range is limited with widely used UHV pumps, viz. turbo molecular pump and cryogenic pump. Pre condensed argon layers in cryogenic pump create porous structure on the surface of the pump, which traps hydrogen gas at a temperature less than 20° K. Additional argon gas injection in the cryogenic pump, at lowest temperature, generates multiple layers of condensed argon as a porous frost with 10 to 100 A° diameters pores, which increase the pumping capacity of hydrogen gas. This pumping mechanism of hydrogen is more effective, to pump more hydrogen gas in UHV range applicable in accelerator, space simulation etc. and where hydrogen is used as fuel gas like tokamak. For this experiment, the cryogenic pump with a closed loop refrigerator using helium gas is used to produce the minimum cryogenic temperature as ∼ 14° K. In this paper, effect of cryosorption of hydrogen is presented with different levels of argon gas and hydrogen gas in cryogenic pump chamber.

  14. Countermeasure against thermal fatigue crack of primary loop recirculation pump in BWR

    International Nuclear Information System (INIS)

    Noda, Hiroshi; Narabayashi, Tadashi; Takahashi, Yuuji

    2008-01-01

    The reactor water was fed to the purge water of the mechanical seal on the original design of the primary loop recirculation pump. Because the mechanical seal had a short life due to the cruds in the reactor water, the clean purge water was adopted instead of the reactor water. After this modification, the shallow cracks were found on the surface of the pump shaft and casing cover due to the temperature fluctuation between the cold purge water and the hot pump discharge water. The fundamental mechanism and countermeasure were investigated by scale test, mock-up test and so on. The flow barrier with a heater was contrived through these tests. It has been introduced gradually in operating and constructing PLR pumps after its completion in 1995. The PLR pumps are overhauled around every 10 years in Japan. The first overhaul of the PLR pumps showed no cracks around the pump shaft and casing over after 10 years' operation. This paper presents both its development process and inspection results. (author)

  15. Urinary cotinine testing as pre-operative assessment of patients undergoing free flap surgery.

    Science.gov (United States)

    Reinbold, C; Rausky, J; Binder, J-P; Revol, M

    2015-02-01

    The identified risks of smoking with regard to operated tissues are so elevated that it is clearly dangerous to operate a smoker when the proposed intervention is neither vital nor urgent. The aim of this prospective study was to evaluate a simple method of screening patients who smoke, with the evaluation carried out before agreeing to carry out free tissue transfer. The purpose of the testing was to hold the patient responsible for his actions and minimize smoking-related complications by cancelling or postponing the planned operation if the patient continued to smoke. Screening included use of a standardized questionnaire at the first consultation and detection of cotinine using a urine test strip 7 days before the scheduled surgery. Patients were informed that in the event of positive results, the operation would not take place. A six-week preoperative smoking cessation period was mandatory. Seventy-six patients were included in this study. Among them, 25 (32.9%) reported being former smokers and 11 (14.5%) admitted in the initial questionnaire to being active smokers. Six patients (7.9%), including one self-reported non-smoker, tested positive for cotinine, and their operations were cancelled. Screening using a questionnaire and cotinine detection appeared to constitute a simple, inexpensive, rapid and reliable test. It allowed us to refuse to operate 6 non-compliant patients and was thereby likely to diminish morbidity in the free tissue transfers carried out in our ward. Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  16. Electromagnetic circulation pump for corrosive gases

    International Nuclear Information System (INIS)

    Noe, P.; Delafosse, D.; Deletre, G.

    1965-01-01

    In order to transport very corrosive products (fluorinated compounds) we have been led to develop a totally metallic circulation pump capable of operating at above room temperatures and with a molecular vacuum. We have aimed at maximum simplicity both in its conception and in its operation. The tests showed that the compression ratios produced, although not high are interesting (1.5 at a pressure of 100 torr) (see curve I). The flow-rate range is very wide: about one hundred ccs/atm/min. to 3000 ccs/atm/min. (see curves IV, V, VI). The desorption of this pump presents no difficulty if both the aspiration and the reject sides are pumped together. A hole of 2 mm diameter drilled in the piston makes it possible to desorb the space between the two segments. The price of this pump is not high: 1300 F, with the electrical cabinet. (authors) [fr

  17. Research on rotational speed to the influence of pump as turbine

    International Nuclear Information System (INIS)

    Yang, S S; Kong, F Y; Jiang, W M; Qu, X Y

    2012-01-01

    Due to the problem of lacking hydraulic control devices, pump as turbine (PAT) has the disadvantage of optimum operation only within a small range discharge where the net head utilization and operating efficiency are the highest. Variable speed operation offers a good solution to this problem. Pump manufactures normally do not provide performance curves of their pumps working as turbines, especially when working at variable speed condition. Therefore, establishing a correlation between PAT's performance curve and rotational speed is essential. In this paper, a method of predicting PAT's performance at different rotational speeds was first developed using theoretical analysis. In the second step, a single stage centrifugal pump operated as a turbine was tested at different rotational speeds. Typical performance curves of PAT operating at variable speed condition were acquired. Finally computational fluid dynamics (CFD) had been used in this research. The accuracy of CFD prediction was proved when compared with experimental data. The validity of presented method by theoretical analysis was validated using test and CFD results.

  18. Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, Ruben P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, Wendy [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-03-04

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  19. Pumps in nuclear power plants

    International Nuclear Information System (INIS)

    Kim, J.H.

    1991-01-01

    This paper reports that pumps play an important role in nuclear plant operation. For instance, reactor coolant pumps (RCPs) should provide adequate cooling for reactor core in both normal operation and transient or accident conditions. Pumps such as Low Pressure Safety Injection (LPSI) pump in the Emergency Core Cooling System (ECCS) play a crucial role during an accident, and their reliability is of paramount importance. Some key issues involved with pumps in nuclear plant system include the performance of RCP under two-phase flow conditions, piping vibration due to pump operating in two-phase flows, and reliability of LPSI pumps

  20. Adsorption pump for helium pumping out

    International Nuclear Information System (INIS)

    Donde, A.L.; Semenenko, Yu.E.

    1981-01-01

    Adsorption pump with adsorbent cooling by liquid helium is described. Shuttered shield protecting adsorbent against radiation is cooled with evaporating helium passing along the coil positioned on the shield. The pump is also equipped with primed cylindrical shield, cooled with liquid nitrogen. The nitrogen shield has in the lower part the shuttered shield, on the pump casing there is a valve used for pump pre-burning, and valves for connection to recipient as well. Pumping- out rates are presented at different pressures and temperatures of adsorbent. The pumping-out rate according to air at absorbent cooling with liquid nitrogen constituted 5x10 -4 Pa-3000 l/s, at 2x10 -2 Pa-630 l/s. During the absorbent cooling with liquid hydrogen the pumping-out rate according to air was at 4x10 -4 Pa-580 l/s, at 2x10 -3 Pa-680 l/s, according to hydrogen - at 8x10 -5 Pa-2500 l/s, at 5x10 -3 Pa-4200 l/s. During adsorbent cooling with liquid helium the rate of pumping-out according to hydrogen at 3x10 5 Pa-2400% l/s, at 6x10 3 Pa-1200 l/s, and according to helium at 3.5x10 -5 Pa-2800 l/s, at 4x10 -3 Pa-1150 l/s. The limit vacuum is equal to 1x10 -7 Pa. The volume of the vessel with liquid helium is equal to 3.5 l. Helium consumption is 80 cm 3 /h. Consumption of liquid nitrogen from the shield is 400 cm 3 /h. The limit pressure in the pump is obtained after forevacuum pumping-out (adsorbent regeneration) at 300 K temperature. The pump is made of copper. The pump height together with primed tubes is 800 mm diameter-380 mm [ru

  1. FY 1991 Report on research and development of super heat pump energy accumulation system. Part 1. Construction and operation of the prototype system (researches on elementary techniques and construction and operation of the pilot system); Super heat pump energy shuseki system no kenkyu kaiahtsu 1981 nendo seika hokokusho. 1. System shisaku unten kenkyu (yoso gijutsu no kenkyu / pilot system no shisaku unten kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-05-01

    Summarized herein are R and D results of the super high performance heat pumps and elementary equipment, for R and D of the super heat pump energy accumulation system. For R and D of the super high performance compression heat pumps, the R and D efforts are directed to tests and evaluation of the pilot plant for the highly efficient type (for heating only), which produce the results of COP exceeding the target of 8; to tests of the anti-corrosion measures for the aluminum heat exchangers for the highly efficient type (for cooling and heating), by which the effective inhibitors are selected. The hybrid systems of the super high performance compression heat pumps and chemical heat storage are also studied in detail. The R and D efforts are directed to construction and operation of the hybrid heat pump system to collect underground heat for the high temperature type (utilizing low temperature heat source), which produce the results of confirming possibility of efficient heat collection for extended periods; and to improvement, construction on a trial basis and operation of the high-speed reciprocating compressors and steam superchargers for the high temperature type (utilizing high temperature heat source). For R and D of the elementary equipment, tests and evaluation are conducted for the EHD heat exchangers which use R123 as the new working fluid. (NEDO)

  2. Association of pre-operative medication use with post-operative delirium in surgical oncology patients receiving comprehensive geriatric assessment.

    Science.gov (United States)

    Jeong, Young Mi; Lee, Eunsook; Kim, Kwang-Il; Chung, Jee Eun; In Park, Hae; Lee, Byung Koo; Gwak, Hye Sun

    2016-07-07

    Older patients undergoing surgery tend to have a higher frequency of delirium. Delirium is strongly associated with poor surgical outcomes. This study evaluated the association between pre-operative medication use and post-operative delirium (POD) in surgical oncology patients receiving comprehensive geriatric assessment (CGA). A total of 475 patients who were scheduled for cancer surgery and received CGA from January 2014 to June 2015 were included. Pre-operative medication review through CGA was conducted on polypharmacy (≥5 medications), delirium-inducing medications (DIMs), fall-inducing medications (FIMs), and potentially inappropriate medications (PIMs). POD was confirmed by psychiatric consultation, and DSM-V criteria were used for diagnosing delirium. The model fit of the prediction model was assessed by computing the Hosmer-Lemeshow goodness-of-fit test. Effect size was measured using the Nagelkerke R(2). Discrimination of the model was assessed by an analysis of the area under receiver operating curve (AUROC). Two models were constructed for multivariate analysis based on univariate analysis; model I included dementia and DIM in addition to age and sex, and model II included PIM instead of DIM of model I. Every one year increase of age increased the risk of POD by about 1.1-fold. DIM was a significant factor for POD after adjusting for confounders (AOR 12.78, 95 % CI 2.83-57.74). PIM was also a significant factor for POD (AOR 5.53, 95 % CI 2.03-15.05). The Hosmer-Lemeshow test results revealed good fits for both models (χ(2) = 3.842, p = 0.871 for model I and χ(2) = 8.130, p = 0.421 for model II). The Nagelkerke R(2) effect size and AUROC for model I was 0.215 and 0.833, respectively. Model II had the Nagelkerke R(2)effect size of 0.174 and AUROC of 0.819. These results suggest that pharmacists' comprehensive review for pre-operative medication use is critical for the post-operative outcomes like delirium in older patients.

  3. Test quality

    International Nuclear Information System (INIS)

    Hartley, R.S.; Keller, A.E.

    1992-01-01

    This document discusses inservice testing of safety-related components at nuclear power plants which is performed under the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (the Code). Subsections IWP and IWV of Section XI of the Code state test method and frequency requirements for pumps and valves respectively. Tests vary greatly in quality and frequency. This paper explores the concept of test quality and its relationship with operational readiness and preventive maintenance. This paper also considers the frequencies of component testing. Test quality is related to a test's ability to detect degradation that can cause component failure. The quality of the test depends on several factors, including specific parameters measured, system or component conditions, and instrument accuracy. The quality of some currently required tests for check valves, motor-operated valves, and pumps is also discussed. Suggestions are made to improve test quality by measuring different parameters, testing valves under load, and testing positive displacement pumps at high pressure and centrifugal pumps at high flow rate conditions. These suggestions can help to improve the level of assurance of component operational readiness gained from testing

  4. Direct solar-pumped iodine laser amplifier

    Science.gov (United States)

    Han, Kwang S.; Hwang, In Heon

    1990-01-01

    The optimum conditions of a solar pumped iodine laser are found in this research for the case of a continuous wave operation and a pulsed operation. The optimum product of the pressure(p) inside the laser tube and the tube diameter(d) was pd=40 approx. 50 torr-cm on the contrary to the case of a high intensity flashlamp pumped iodine laser where the optimum value of the product is known to be pd=150 torr-cm. The pressure-diameter product is less than 1/3 of that of the high power iodine laser. During the research period, various laser materials were also studied for solar pumping. Among the laser materials, Nd:YAG is found to have the lowest laser threshold pumping intensity of about 200 solar constant. The Rhodamine 6G was also tested as the solar pumped laser material. The threshold pumping power was measured to be about 20,000 solar constant. The amplification experiment for a continuously pumped iodine laser amplifier was performed using Vortek solar simulator and the amplification factors were measured for single pass amplification and triple pass amplification of the 15 cm long amplifier tube. The amplification of 5 was obtained for the triple pass amplification.

  5. High energy high repetition-rate thin-disk amplifier for OPCPA pumping

    Energy Technology Data Exchange (ETDEWEB)

    Schulz, Michael

    2013-08-15

    effect of amplified spontaneous emission (ASE) in the gain material as well as the operation of the pump laser in a burst-mode. Burst-mode operation requires a relatively long pre-pumping phase, which increases ASE related problems. A very important parameter for a large-scale OPCPA system is the timing between pump and OPCPA seed pulses. A drift would cause a loss in the temporal overlap within the crystal. Therefore, a method for the synchronization of pump and seed laser pulses in the OPCPA system by means of a two-crystal balanced optical cross-correlator has been developed and tested.

  6. High energy high repetition-rate thin-disk amplifier for OPCPA pumping

    International Nuclear Information System (INIS)

    Schulz, Michael

    2013-08-01

    effect of amplified spontaneous emission (ASE) in the gain material as well as the operation of the pump laser in a burst-mode. Burst-mode operation requires a relatively long pre-pumping phase, which increases ASE related problems. A very important parameter for a large-scale OPCPA system is the timing between pump and OPCPA seed pulses. A drift would cause a loss in the temporal overlap within the crystal. Therefore, a method for the synchronization of pump and seed laser pulses in the OPCPA system by means of a two-crystal balanced optical cross-correlator has been developed and tested.

  7. Closed-loop helium circulation system for actuation of a continuously operating heart catheter pump.

    Science.gov (United States)

    Karabegovic, Alen; Hinteregger, Markus; Janeczek, Christoph; Mohl, Werner; Gföhler, Margit

    2017-06-09

    Currently available, pneumatic-based medical devices are operated using closed-loop pulsatile or open continuous systems. Medical devices utilizing gases with a low atomic number in a continuous closed loop stream have not been documented to date. This work presents the construction of a portable helium circulation addressing the need for actuating a novel, pneumatically operated catheter pump. The design of its control system puts emphasis on the performance, safety and low running cost of the catheter pump. Static and dynamic characteristics of individual elements in the circulation are analyzed to ensure a proper operation of the system. The pneumatic circulation maximizes the working range of the drive unit inside the catheter pump while reducing the total size and noise production.Separate flow and pressure controllers position the turbine's working point into the stable region of the pressure creation element. A subsystem for rapid gas evacuation significantly decreases the duration of helium removal after a leak, reaching subatmospheric pressure in the intracorporeal catheter within several milliseconds. The system presented in the study offers an easy control of helium mass flow while ensuring stable behavior of its internal components.

  8. Efficient single-mode operation of a cladding-pumped ytterbium-doped helical-core fiber laser.

    Science.gov (United States)

    Wang, P; Cooper, L J; Sahu, J K; Clarkson, W A

    2006-01-15

    A novel approach to achieving robust single-spatial-mode operation of cladding-pumped fiber lasers with multimode cores is reported. The approach is based on the use of a fiber geometry in which the core has a helical trajectory within the inner cladding to suppress laser oscillation on higher-order modes. In a preliminary proof-of-principle study, efficient single-mode operation of a cladding-pumped ytterbium-doped helical-core fiber laser with a 30 microm diameter core and a numerical aperture of 0.087 has been demonstrated. The laser yielded 60.4 W of output at 1043 nm in a beam with M2 clad fiber lasers.

  9. Development and Optimized Design of Propeller Pump System & Structure with VFD in Low-head Pumping Station

    Science.gov (United States)

    Rentian, Zhang; Honggeng, Zhu; Arnold, Jaap; Linbi, Yao

    2010-06-01

    Compared with vertical-installed pumps, the propeller (bulb tubular) pump systems can achieve higher hydraulic efficiencies, which are particularly suitable for low-head pumping stations. More than four propeller pumping stations are being, or will be built in the first stage of the S-to-N Water Diversion Project in China, diverting water from Yangtze River to the northern part of China to alleviate water-shortage problems and develop the economy. New structures of propeller pump have been developed for specified pumping stations in Jiangsu and Shandong Provinces respectively and Variable Frequency Drives (VFDs) are used in those pumping stations to regulate operating conditions. Based on the Navier-Stokes equations and the standard k-e turbulent model, numerical simulations of the flow field and performance prediction in the propeller pump system were conducted on the platform of commercial software CFX by using the SIMPLEC algorithm. Through optimal design of bulb dimensions and diffuser channel shape, the hydraulic system efficiency has improved evidently. Furthermore, the structures of propeller pumps have been optimized to for the introduction of conventional as well as permanent magnet motors. In order to improve the hydraulic efficiency of pumping systems, both the pump discharge and the motor diameter were optimized respectively. If a conventional motor is used, the diameter of the pump casing has to be increased to accommodate the motor installed inside. If using a permanent magnet motor, the diameter of motor casing can be decreased effectively without decreasing its output power, thus the cross-sectional area is enlarged and the velocity of flowing water decreased favorably to reduce hydraulic loss of discharge channel and thereby raising the pumping system efficiency. Witness model tests were conducted after numerical optimization on specific propeller pump systems, indicating that the model system hydraulic efficiencies can be improved by 0.5%˜3.7% in

  10. Centrifugal pumps

    CERN Document Server

    Gülich, Johann Friedrich

    2014-01-01

    This book gives an unparalleled, up-to-date, in-depth treatment of all kinds of flow phenomena encountered in centrifugal pumps including the complex interactions of fluid flow with vibrations and wear of materials. The scope includes all aspects of hydraulic design, 3D-flow phenomena and partload operation, cavitation, numerical flow calculations, hydraulic forces, pressure pulsations, noise, pump vibrations (notably bearing housing vibration diagnostics and remedies), pipe vibrations, pump characteristics and pump operation, design of intake structures, the effects of highly viscous flows, pumping of gas-liquid mixtures, hydraulic transport of solids, fatigue damage to impellers or diffusers, material selection under the aspects of fatigue, corrosion, erosion-corrosion or hydro-abrasive wear, pump selection, and hydraulic quality criteria. As a novelty, the 3rd ed. brings a fully analytical design method for radial impellers, which eliminates the arbitrary choices inherent to former design procedures. The d...

  11. Application Research on Testing Efficiency of Main Drainage Pump in Coal Mine Using Thermodynamic Theories

    OpenAIRE

    Shang, Deyong

    2017-01-01

    The efficiency of a drainage pump should be tested at regular intervals to master the status of the drainage pump in real time and thus achieve the goal of saving energy. The ultrasonic flowmeter method is traditionally used to measure the flow of the pump. But there are some defects in this kind of method of underground coal mine. This paper first introduces the principle of testing the main drainage pump efficiency in coal mine using thermodynamic theories, then analyzes the energy transfor...

  12. 85,000-GPM, single-stage, single-suction LMFBR intermediate centrifugal pump

    International Nuclear Information System (INIS)

    Fair, C.E.; Cook, M.E.; Huber, K.A.; Rohde, R.

    1983-01-01

    The mechanical and hydraulic design features of the 85,000-gpm, single-stage, single-suction pump test article, which is designed to circulate liquid-sodium coolant in the intermediate heat-transport system of a Large-Scale Liquid Metal Fast Breeder Reactor (LS-LMFBR), are described. The design and analytical considerations used to satisfy the pump performance and operability requirements are presented. The validation of pump hydraulic performance using a hydraulic scale-model pump is discussed, as is the featute test for the mechanical-shaft seal system

  13. Thoroughly tested. Field test to determine the real efficieny of heat pumps; Auf Herz und Nieren. Felduntersuchung zur realen Effizienz von Waermepumpen

    Energy Technology Data Exchange (ETDEWEB)

    Guenther, Danny; Miara, Marek [Fraunhofer-Institut fuer Solare Energiesysteme (ISE), Freiburg im Breisgau (Germany)

    2011-10-15

    Field tests of Fraunhofer ISE showed that the coefficients of performance of heat pumps vary widely, so that the use of calculated mean values should be reconsidered. The wide variation is due to faulty installation and operation but also to a change in the specific heat demand of buildings. New buildings have better thermal insulation and therefore more heat is consumed proportionally for freshwater heating, so the coefficient of performance will be lower.

  14. Pre-operative clinical assessment for anaesthesia and the effect of ...

    African Journals Online (AJOL)

    Background. HIV infection is common in South Africa, often remaining clinically latent and liable to be missed during clinical pre-operative assessment, despite the patient having a severe degree of immune compromise. Objectives. The primary objective was to determine the pre-operative physical status of patients ...

  15. An observational cohort study on pre-operative investigations and referrals: How far are we following recommendations?

    Science.gov (United States)

    Karim, Habib Md Reazaul; Yunus, Md; Bhattacharyya, Prithwis

    2016-01-01

    Background and Aims: Pre-operative investigations are often required to supplement information for risk stratification and assessing reserve for undergoing surgery. Although there are evidence-based recommendations for which investigations should be done, clinical practice varies. The present study aimed to assess the pre-operative investigations and referral practices and compare it with the standard guidelines. Methods: The present observational study was carried out during 2014–appen2015 in a teaching institute after the approval from Institute Ethical Committee. A designated anaesthesiologist collected data from the completed pre-anaesthetic check-up (PAC) sheets. Investigations already done, asked by anaesthesiologists as well as referral services sought were noted and compared with an adapted master table prepared from standard recommendations and guidelines. Data were expressed in frequencies, percentage and statistically analysed using INSTAT software (GraphPad Prism software Inc., La Zolla, USA). Results: Seventy-five out of 352 patients (42.67% male, 57.33% female; American Society of Anesthesiologists physical status I to III) were included in this study. Nearly, all patients attended PAC with at least 5 investigations done. Of them, 89.33% were subjected to at least one unnecessary investigation and 91.67% of the referral services were not required which lead to 3.5 ( SD ±1.64) days loss. Anaesthesiologist-ordered testing was more focused than surgeons. Conclusion: More than two-third of pre-operative investigations and referral services are unnecessary. Anaesthesiologists are relatively more rational in ordering pre-operative tests yet; a lot can be done to rationalise the practice as well as reducing healthcare cost. PMID:27601737

  16. Normetex Pump Alternatives Study

    International Nuclear Information System (INIS)

    Clark, Elliot A.

    2013-01-01

    A mainstay pump for tritium systems, the Normetex scroll pump, is currently unavailable because the Normetex company went out of business. This pump was an all-metal scroll pump that served tritium processing facilities very well. Current tritium system operators are evaluating replacement pumps for the Normetex pump and for general used in tritium service. An all-metal equivalent alternative to the Normetex pump has not yet been identified. 1. The ideal replacement tritium pump would be hermetically sealed and contain no polymer components or oils. Polymers and oils degrade over time when they contact ionizing radiation. 2. Halogenated polymers (containing fluorine, chlorine, or both) and oils are commonly found in pumps. These materials have many properties that surpass those of hydrocarbon-based polymers and oils, including thermal stability (higher operating temperature) and better chemical resistance. Unfortunately, they are less resistant to degradation from ionizing radiation than hydrocarbon-based materials (in general). 3. Polymers and oils can form gaseous, condensable (HF, TF), liquid, and solid species when exposed to ionizing radiation. For example, halogenated polymers form HF and HCl, which are extremely corrosive upon reaction with water. If a pump containing polymers or oils must be used in a tritium system, the system must be designed to be able to process the unwanted by-products. Design features to mitigate degradation products include filters and chemical or physical traps (eg. cold traps, oil traps). 4. Polymer components can work in tritium systems, but must be replaced regularly. Polymer components performance should be monitored or be regularly tested, and regular replacement of components should be viewed as an expected normal event. A radioactive waste stream must be established to dispose of used polymer components and oil with an approved disposal plan developed based on the facility location and its regulators. Polymers have varying

  17. Predictors of Success in Bariatric Surgery: the Role of BMI and Pre-operative Comorbidities.

    Science.gov (United States)

    da Cruz, Magda Rosa Ramos; Branco-Filho, Alcides José; Zaparolli, Marília Rizzon; Wagner, Nathalia Farinha; de Paula Pinto, José Simão; Campos, Antônio Carlos Ligocki; Taconeli, Cesar Augusto

    2017-11-10

    This is a retrospective review of 204 patients who underwent bariatric surgery. The impact of weight regain (WR), pre-operative comorbidities and BMI values on the recurrence of comorbidities was evaluated, and an equation was elaborated to estimate BMI at 5 years of bariatric surgery. Pre-operative data, after 1 year and after 5 years, was collected from the medical records. Descriptive analyses and bivariate hypothesis tests were performed first, and then, a generalised linear regression model with Tweedie distribution was adjusted. The hit rate and the Kendall coefficient of concordance (Kendall's W) of the equation were calculated. At the end, the Mann-Whitney test was performed between the BMI, WR and the presence of comorbidities, after a post-operative period of 5 years. The adjustment of the model resulted in an equation that estimates the mean value of BMI 5 years after surgery. The hit rate was 82.35% and the value of Kendall's W was 0.85 for the equation. It was found that patients with comorbidities presented a higher median WR (10.13%) and a higher mean BMI (30.09 kg/m 2 ) 5 years after the surgery. It is concluded that the equation is useful for estimating the mean BMI at 5 years of surgery and that patients with low pre-operative HDL and folic acid levels, with depression and/or anxiety and a higher BMI, have a higher BMI at 5 years of surgery and higher incidence of comorbid return and dissatisfaction with post-operative results.

  18. Hanford high level waste (HLW) tank mixer pump safe operating envelope reliability assessment

    International Nuclear Information System (INIS)

    Fischer, S.R.; Clark, J.

    1993-01-01

    The US Department of Energy and its contractor, Westinghouse Corp., are responsible for the management and safe storage of waste accumulated from processing defense reactor irradiated fuels for plutonium recovery at the Hanford Site. These wastes, which consist of liquids and precipitated solids, are stored in underground storage tanks pending final disposition. Currently, 23 waste tanks have been placed on a safety watch list because of their potential for generating, storing, and periodically releasing various quantities of hydrogen and other gases. Tank 101-SY in the Hanford SY Tank Farm has been found to release hydrogen concentrations greater than the lower flammable limit (LFL) during periodic gas release events. In the unlikely event that an ignition source is present during a hydrogen release, a hydrogen burn could occur with a potential to release nuclear waste materials. To mitigate the periodic gas releases occurring from Tank 101-SY, a large mixer pump currently is being installed in the tank to promote a sustained release of hydrogen gas to the tank dome space. An extensive safety analysis (SA) effort was undertaken and documented to ensure the safe operation of the mixer pump after it is installed in Tank 101-SY.1 The SA identified a need for detailed operating, alarm, and abort limits to ensure that analyzed safety limits were not exceeded during pump operations

  19. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Yoshio; Nakagami, Yasuo; Fujii, Hisashi; Shibanai, Hirooki.

    1980-01-01

    Two 1175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  20. Pre-operative stroke and neurological disability do not independently affect short- and long-term mortality in infective endocarditis patients.

    Science.gov (United States)

    Diab, Mahmoud; Guenther, Albrecht; Sponholz, Christoph; Lehmann, Thomas; Faerber, Gloria; Matz, Anna; Franz, Marcus; Witte, Otto W; Pletz, Mathias W; Doenst, Torsten

    2016-10-01

    Infective endocarditis (IE) is still associated with high morbidity and mortality. The impact of pre-operative stroke on mortality and long-term survival is controversial. In addition, data on the severity of neurological disability due to pre-operative stroke are scarce. We analysed the impact of pre-operative stroke and the severity of its related neurological disability on short- and long-term outcome. We retrospectively reviewed our data from patients operated for left-sided IE between 01/2007 and 04/2013. We performed univariate (Chi-Square and independent samples t test) and multivariate analyses. Among 308 consecutive patients who underwent cardiac surgery for left-sided IE, pre-operative stroke was present in 87 (28.2 %) patients. Patients with pre-operative stroke had a higher pre-operative risk profile than patient without it: higher Charlson comorbidity index (8.1 ± 2.6 vs. 6.6 ± 3.3) and higher incidence of Staphylococcus aureus infection (43 vs. 17 %) and septic shock (37 vs. 19 %). In-hospital mortality was equal but 5-year survival was significantly worse with pre-operative stroke (33.1 % vs. 45 %, p = 0.006). 5-year survival was worst in patients with severe neurological disability compared to mild disability (19.0 vs. 0.58 %, p = 0.002). However, neither pre-operative stroke nor the degree of neurological disability appeared as an independent risk factor for short or long-term mortality by multivariate analysis. Pre-operative stroke and the severity of neurological disability do not independently affect short- and long-term mortality in patients with infective endocarditis. It appears that patients with pre-operative stroke present with a generally higher risk profile. This information may substantially affect decision-making.

  1. A highly reliable cryogenic mixing pump with no mechanical moving parts

    Science.gov (United States)

    Chen, W.; Niblick, A. L.

    2017-12-01

    This paper presents the design and preliminary test results of a novel cryogenic mixing pump based on magnetocaloric effect. The mixing pump is developed to enable long-term cryogenic propellant storage in space by preventing thermal stratification of cryogens in storage tanks. The mixing pump uses an innovative thermodynamic process to generate fluid jets to promote fluid mixing, eliminating the need for mechanical pumps. Its innovative mechanism uses a solid magnetocaloric material to alternately vaporize and condense the cryogen in the pumping chamber, and thus control the volume of the fluid inside the pumping chamber to produce pumping action. The pump is capable of self-priming and can generate a high-pressure rise. This paper discusses operating mechanism and design consideration of the pump, introduces the configuration of a brassboard cryogenic pump, and presents the preliminary test results of the pump with liquid nitrogen.

  2. In situ performance curves measurements of large pumps

    International Nuclear Information System (INIS)

    Anton, A

    2010-01-01

    The complex energetic system on the river Lotru in Romania comprises of a series of lakes and pumping stations and a major hydroelectric power plant: Lotru-Ciunget. All the efforts have been oriented towards the maintenance of the Pelton turbines and very little attention has been directed to the pumps. In the system, there are three large pumping stations and only in the last 5 years, the pump performances have become a concern. The performances where determined using portable ultrasonic flow meters, a Yates meter, precision manometers and appropriate electrical equipment for power measurement (Power Analiser - NORMA D4000 LEM). The measurements are not supposed to interfere with the normal operation so only a limited number of tests could be performed. Based on those tests, portions of the test curves have been measured and represented in specific diagrams.

  3. In situ performance curves measurements of large pumps

    Science.gov (United States)

    Anton, A.

    2010-08-01

    The complex energetic system on the river Lotru in Romania comprises of a series of lakes and pumping stations and a major hydroelectric power plant: Lotru-Ciunget. All the efforts have been oriented towards the maintenance of the Pelton turbines and very little attention has been directed to the pumps. In the system, there are three large pumping stations and only in the last 5 years, the pump performances have become a concern. The performances where determined using portable ultrasonic flow meters, a Yates meter, precision manometers and appropriate electrical equipment for power measurement (Power Analiser - NORMA D4000 LEM). The measurements are not supposed to interfere with the normal operation so only a limited number of tests could be performed. Based on those tests, portions of the test curves have been measured and represented in specific diagrams.

  4. Pumping Test Determination of Unsaturated Aquifer Properties

    Science.gov (United States)

    Mishra, P. K.; Neuman, S. P.

    2008-12-01

    Tartakovsky and Neuman [2007] presented a new analytical solution for flow to a partially penetrating well pumping at a constant rate from a compressible unconfined aquifer considering the unsaturated zone. In their solution three-dimensional, axially symmetric unsaturated flow is described by a linearized version of Richards' equation in which both hydraulic conductivity and water content vary exponentially with incremental capillary pressure head relative to its air entry value, the latter defining the interface between the saturated and unsaturated zones. Both exponential functions are characterized by a common exponent k having the dimension of inverse length, or equivalently a dimensionless exponent kd=kb where b is initial saturated thickness. The authors used their solution to analyze drawdown data from a pumping test conducted by Moench et al. [2001] in a Glacial Outwash Deposit at Cape Cod, Massachusetts. Their analysis yielded estimates of horizontal and vertical saturated hydraulic conductivities, specific storage, specific yield and k . Recognizing that hydraulic conductivity and water content seldom vary identically with incremental capillary pressure head, as assumed by Tartakovsky and Neuman [2007], we note that k is at best an effective rather than a directly measurable soil parameter. We therefore ask to what extent does interpretation of a pumping test based on the Tartakovsky-Neuman solution allow estimating aquifer unsaturated parameters as described by more common constitutive water retention and relative hydraulic conductivity models such as those of Brooks and Corey [1964] or van Genuchten [1980] and Mualem [1976a]? We address this question by showing how may be used to estimate the capillary air entry pressure head k and the parameters of such constitutive models directly, without a need for inverse unsaturated numerical simulations of the kind described by Moench [2003]. To assess the validity of such direct estimates we use maximum

  5. Pre-employment medical testing in Brazil: ethical challenges.

    Science.gov (United States)

    Palhares, Dario; Laurentino dos Santos, Ivone

    2012-01-01

    Pre-employment medical tests, considered to be a practice within the subspecialty of occupational medicine, are ordered by physicians on behalf of employers. Candidates for a job may be rejected if they are found to suffer from a condition that can be worsened by the job, or one that may put other workers at risk. As the physician who orders pre-employment tests is chosen by the employer, pre-employment tests can violate both the autonomy and the privacy of the individual. This paper discusses ethical conflicts inherent in pre-employment medical testing.

  6. Possible efficiency improvement by application of various operating regimes for the cooling water pump station at thermal power plant - Bitola

    Directory of Open Access Journals (Sweden)

    Mijakovski Vladimir

    2012-01-01

    Full Text Available Thermal power plant (TPP - Bitola is the largest electricity producer in the Republic of Macedonia with installed capacity of 691 MW. It is a lignite fired power plant, in operation since 1982. Most of the installed equipment is of Russian origin. Power plant's cold end comprised of a condenser, pump station and cooling tower is depicted in the article. Possible way to raise the efficiency of the cold end by changing the operating characteristics of the pumps is presented in the article. Diagramic and tabular presentation of the working characteristics of the pumps (two pumps working in paralel for one block with the pipeline, as well as engaged power for their operation are also presented in this article.

  7. Transcranial magnetic stimulation in the semi-quantitative, pre-operative assessment of patients undergoing spinal deformity surgery.

    Science.gov (United States)

    Glasby, Michael A; Tsirikos, Athanasios I; Henderson, Lindsay; Horsburgh, Gillian; Jordan, Brian; Michaelson, Ciara; Adams, Christopher I; Garrido, Enrique

    2017-08-01

    To compare measurements of motor evoked potential latency stimulated either magnetically (mMEP) or electrically (eMEP) and central motor conduction time (CMCT) made pre-operatively in conscious patients using transcranial and intra-operatively using electrical cortical stimulation before and after successful instrumentation for the treatment of adolescent idiopathic scoliosis. A group initially of 51 patients with adolescent idiopathic scoliosis aged 12-19 years was evaluated pre-operatively in the outpatients' department with transcranial magnetic stimulation. The neurophysiological data were then compared statistically with intra-operative responses elicited by transcranial electrical stimulation both before and after successful surgical intervention. MEPs were measured as the cortically evoked compound action potentials of Abductor hallucis. Minimum F-waves were measured using conventional nerve conduction methods and the lower motor neuron conduction time was calculated and this was subtracted from MEP latency to give CMCT. Pre-operative testing was well tolerated in our paediatric/adolescent patients. No neurological injury occurred in any patient in this series. There was no significant difference in the values of mMEP and eMEP latencies seen pre-operatively in conscious patients and intra-operatively in patients under anaesthetic. The calculated quantities mCMCT and eCMCT showed the same statistical correlations as the quantities mMEP and eMEP latency. The congruency of mMEP and eMEP and of mCMCT and eCMCT suggests that these measurements may be used comparatively and semi-quantitatively for the comparison of pre-, intra-, and post-operative spinal cord function in spinal deformity surgery.

  8. Pre-operative optimisation of lung function

    Directory of Open Access Journals (Sweden)

    Naheed Azhar

    2015-01-01

    Full Text Available The anaesthetic management of patients with pre-existing pulmonary disease is a challenging task. It is associated with increased morbidity in the form of post-operative pulmonary complications. Pre-operative optimisation of lung function helps in reducing these complications. Patients are advised to stop smoking for a period of 4–6 weeks. This reduces airway reactivity, improves mucociliary function and decreases carboxy-haemoglobin. The widely used incentive spirometry may be useful only when combined with other respiratory muscle exercises. Volume-based inspiratory devices have the best results. Pharmacotherapy of asthma and chronic obstructive pulmonary disease must be optimised before considering the patient for elective surgery. Beta 2 agonists, inhaled corticosteroids and systemic corticosteroids, are the main drugs used for this and several drugs play an adjunctive role in medical therapy. A graded approach has been suggested to manage these patients for elective surgery with an aim to achieve optimal pulmonary function.

  9. Pre-test analysis of ATLAS SBO with RCP seal leakage scenario using MARS code

    Energy Technology Data Exchange (ETDEWEB)

    Pham, Quang Huy; Lee, Sang Young; Oh, Seung Jong [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    This study presents a pre-test calculation for the Advanced Thermal-hydraulic Test Loop for Accident Simulation (ATLAS) SBO experiment with RCP seal leakage scenario. Initially, turbine-driven auxfeed water pumps are used. Then, outside cooling water injection method is used for long term cooling. The analysis results would be useful for conducting the experiment to verify the APR 1400 extended SBO optimum mitigation strategy using outside cooling water injection in future. The pre-test calculation for ATLAS extended SBO with RCP seal leakage and outside cooling water injection scenario is performed. After Fukushima nuclear accident, the capability of coping with the extended station blackout (SBO) becomes important. Many NPPs are applying FLEX approach as main coping strategies for extended SBO scenarios. In FLEX strategies, outside cooling water injection to reactor cooling system (RCS) and steam generators (SGs) is considered as an effective method to remove residual heat and maintain the inventory of the systems during the accident. It is worthwhile to examine the soundness of outside cooling water injection method for extended SBO mitigation by both calculation and experimental demonstration. From the calculation results, outside cooling water injection into RCS and SGs is verified as an effective method during extended SBO when RCS and SGs depressurization is sufficiently performed.

  10. Evaluation of a nonevaporable getter pump for tritium handling in the Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Singleton, M.F.; Griffith, C.M.

    1978-01-01

    Lawrence Livermore Laboratory has tested and evaluated a commercially available getter pump for use with tritium in the Tokamak Fusion Test Reactor (TFTR). The pump contains Zr(84%)--Al in cartridge form with a concentric heating unit. It performed well in all tests, except for frequent heater failures

  11. Pre-operative irradiation with rectal carcinoma - clinical practices and results

    International Nuclear Information System (INIS)

    Rendl, H.

    1986-01-01

    The goal of this work is to portray the effect of a high-dosed short-timed pre-irradiation on intra- and post-operative therapy of rectal carcinoma and the appearance of recidivistic tumors, respectively distant metastasis. This intermediate balance should help make the decision easier as to whether to continue to use this combined treatment form. The subjects consisted of 65 rectal carcinoma patients - pre-irradiated and operated - and 95 only operated patients. The irradiation was completed using a 8 MeV linear accelerator with ultra hard x-radiation. Dosing - (more than 80%) as short-timed irradiation with 16 Gy (4 x 4 Gy in 2 days) - 25 Gy (10 x 2,5 Gy in 12 days); average field size 150 mm x 150 mm. There were no significant differences with regard to intra- and post-operative complications, late complications or distant metastasis, but there was with tumor recidivision reduced with pre-irradiated. Regarding the survival rate, there was a slight tendency in favor of the pre-irradiated. (orig./MG) [de

  12. Design features and operation experience of the main circulating pumps for the ''Loviisa'' NPP with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Iofs, D.; Kujyala, I.; Timperi, I.; Shlejfer, G.; Vistbakka, V.; Prudovskij, A.M.; Turetskij, L.I.; Vorona, P.N.

    1980-01-01

    Technical characteristics and the operation of main circulating pumps (MCP) designed and mounted at the ''Loviisa'' NPP by Finnish firms ''Alstrem'' and ''Stremberg'' are described. The above MCP have specific advantages over similar pumps mounted at other NPP with pressurized water cooled reactors. This is a possibility of substitution of potentially most damaged units (bearing and pump shaft sealing) for several hours, without MCP disassembly as a whole as well as using rolling bearings together with the original electromagnetic unloading system from the axial force instead of usually employed in similar MCP radial thrust slip bearings. The two year operation experience has confirmed the efficiency and reliability of ''Loviisa'' NPP main circulating pumps

  13. Fabrication and testing of W7-X pre-series target elements

    International Nuclear Information System (INIS)

    Boscary, J; Boeswirth, B; Greuner, H; Grigull, P; Missirlian, M; Plankensteiner, A; Schedler, B; Friedrich, T; Schlosser, J; Streibl, B; Traxler, H

    2007-01-01

    The assembly of the highly-loaded target plates of the WENDELSTEIN 7-X (W7-X) divertor requires the fabrication of 890 target elements (TEs). The plasma facing material is made of CFC NB31 flat tiles bonded to a CuCrZr copper alloy water-cooled heat sink. The elements are designed to remove a stationary heat flux and power up to 10 MW m -2 and 100 kW, respectively. Before launching the serial fabrication, pre-series activities aimed at qualifying the design, the manufacturing route and the non-destructive examinations (NDEs). High heat flux (HHF) tests performed on full-scale pre-series TEs resulted in an improvement of the design of the bond between tiles and heat sink to reduce the stresses during operation. The consequence is the fabrication of additional pre-series TEs to be tested in the HHF facility GLADIS. NDEs of this bond based on thermography methods are developed to define the acceptance criteria suitable for serial fabrication

  14. Summary of Test Results From a 1 kWe-Class Free-Piston Stirling Power Convertor Integrated With a Pumped NaK Loop

    Science.gov (United States)

    Briggs, Maxwell H.; Geng, Steven M.; Pearson, J. Boise; Godfroy, Thomas J.

    2010-01-01

    As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1 kW class free-piston Stirling convertors was modified to operate with a NaK liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The tests included performance mapping the convertors over various hot and cold-end temperatures, piston amplitudes and NaK flow rates; and transient test conditions to simulate various start-up and fault scenarios. Performance maps of the convertors generated using the pumped NaK loop for thermal input show increases in power output over those measured during baseline testing using electric heating. Transient testing showed that the Stirling convertors can be successfully started in a variety of different scenarios and that the convertors can recover from a variety of fault scenarios.

  15. FUMEX cases 1, 2, and 3 calculated pre-test and post-test results

    Energy Technology Data Exchange (ETDEWEB)

    Stefanova, S; Vitkova, M; Passage, G; Manolova, M; Simeonova, V [Bylgarska Akademiya na Naukite, Sofia (Bulgaria). Inst. za Yadrena Izsledvaniya i Yadrena Energetika; Scheglov, A; Proselkov, V [Russian Research Centre Kurchatov Inst., Moscow (Russian Federation); Kharalampieva, Ts [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1994-12-31

    Two versions (modified pre-test and modified post-test) of PIN-micro code were used to analyse the fuel rod behaviour of three FUMEX experiments. The experience of applying PIN-micro code with its simple structure and old conception of the steady-state operation shows significant difficulties in treating the complex processes like those in FUMEX experiments. These difficulties were partially overcame through different model modifications and corrections based on special engineering estimations and the results obtained as a whole do not seem unreasonable. The calculations have been performed by a group from two Bulgarian institutions in collaboration with specialists from the Kurchatov Research Center. 1 tab., 14 figs., 8 refs.

  16. Electrokinetic pump

    Science.gov (United States)

    Patel, Kamlesh D.

    2007-11-20

    A method for altering the surface properties of a particle bed. In application, the method pertains particularly to an electrokinetic pump configuration where nanoparticles are bonded to the surface of the stationary phase to alter the surface properties of the stationary phase including the surface area and/or the zeta potential and thus improve the efficiency and operating range of these pumps. By functionalizing the nanoparticles to change the zeta potential the electrokinetic pump is rendered capable of operating with working fluids having pH values that can range from 2-10 generally and acidic working fluids in particular. For applications in which the pump is intended to handle highly acidic solutions latex nanoparticles that are quaternary amine functionalized can be used.

  17. Feedback control of primary circulation pump of PIUS-Type reactor

    International Nuclear Information System (INIS)

    Fujii, Mikiya; Anoda, Yoshinari; Murata, Hideo; Yonomoto, Taisuke; Kukita, Yutaka; Tasaka, Kanji.

    1991-05-01

    In operating the PIUS-Type reactor, it is required to keep stationary density interfaces between the primary loop hot water and the poison tank cold, borated water by maintaining pressure balance between the primary-loop and the poison-tank. The authors have developed a primary circulation pump speed control system and tested it in small-scale experiments. This control system regulates the pump speed based on measurements of the density lock differential pressure which is proportional to the elevation of the interface in the density lock. This pump speed control facilitated the normal plant operation which included core power changes. However, the elevation of the density interface indicated oscillatory behavior when the pump speed was regulated as a linear function of the density lock differential pressure. The mechanism responsible for such oscillatory behavior was found to be manometric oscillations that could be eliminated by adding a damping term to compensate for the mechanical delay of the primary pump speed. The passive shutdown function of the reactor was retained by setting an upper limit to the pump speed. This was confirmed in a loss-of-feedwater abnormal transient test. (author)

  18. The role of pre-operative and post-operative glucose control in surgical-site infections and mortality.

    Directory of Open Access Journals (Sweden)

    Christie Y Jeon

    Full Text Available The impact of glucose control on surgical-site infection (SSI and death remains unclear. We examined how pre- and post-operative glucose levels and their variability are associated with the risk of SSI or in-hospital death.This retrospective cohort study employed data on 13,800 hospitalized patients who underwent a surgical procedure at a large referral hospital in New York between 2006 and 2008. Over 20 different sources of electronic data were used to analyze how thirty-day risk of SSI and in-hospital death varies by glucose levels and variability. Maximum pre- and post-operative glucose levels were determined for 72 hours before and after the operation and glucose variability was defined as the coefficient of variation of the glucose measurements. We employed logistic regression to model the risk of SSI or death against glucose variables and the following potential confounders: age, sex, body mass index, duration of operation, diabetes status, procedure classification, physical status, emergency status, and blood transfusion.While association of pre- and post-operative hyperglycemia with SSI were apparent in the crude analysis, multivariate results showed that SSI risk did not vary significantly with glucose levels. On the other hand, in-hospital deaths were associated with pre-operative hypoglycemia (OR = 5.09, 95% CI (1.80, 14.4 and glucose variability (OR = 1.14, 95% CI (1.03, 1.27 for 10% increase in coefficient of variation.In-hospital deaths occurred more often among those with pre-operative hypoglycemia and higher glucose variability. These findings warrant further investigation to determine whether stabilization of glucose and prevention of hypoglycemia could reduce post-operative deaths.

  19. The role of pre-operative and post-operative glucose control in surgical-site infections and mortality.

    Science.gov (United States)

    Jeon, Christie Y; Furuya, E Yoko; Berman, Mitchell F; Larson, Elaine L

    2012-01-01

    The impact of glucose control on surgical-site infection (SSI) and death remains unclear. We examined how pre- and post-operative glucose levels and their variability are associated with the risk of SSI or in-hospital death. This retrospective cohort study employed data on 13,800 hospitalized patients who underwent a surgical procedure at a large referral hospital in New York between 2006 and 2008. Over 20 different sources of electronic data were used to analyze how thirty-day risk of SSI and in-hospital death varies by glucose levels and variability. Maximum pre- and post-operative glucose levels were determined for 72 hours before and after the operation and glucose variability was defined as the coefficient of variation of the glucose measurements. We employed logistic regression to model the risk of SSI or death against glucose variables and the following potential confounders: age, sex, body mass index, duration of operation, diabetes status, procedure classification, physical status, emergency status, and blood transfusion. While association of pre- and post-operative hyperglycemia with SSI were apparent in the crude analysis, multivariate results showed that SSI risk did not vary significantly with glucose levels. On the other hand, in-hospital deaths were associated with pre-operative hypoglycemia (OR = 5.09, 95% CI (1.80, 14.4)) and glucose variability (OR = 1.14, 95% CI (1.03, 1.27) for 10% increase in coefficient of variation). In-hospital deaths occurred more often among those with pre-operative hypoglycemia and higher glucose variability. These findings warrant further investigation to determine whether stabilization of glucose and prevention of hypoglycemia could reduce post-operative deaths.

  20. Jet pumps hydrdynamics for application on BWRS

    International Nuclear Information System (INIS)

    Girardi, G.; Pitimada, D.

    1979-01-01

    An analysis of single-phase jet-pump hydrodynamics is carried out by this paper with special regard to the applications on cooling water recirculation in the boiling water reactors (BWR). Firstly, in order to asses on efficiency of jet pumps, several theories regarding the hydrodynamic of these machines are also investigated. The results of the above theories are critically analysed and compared regarding to water-jet-pump design, to operational performance curves and to section limits. Some general criteria in jet-pump design are introduced and values of geometric and kinematic parameters are suggested together with losses coefficients which are all concerned with the ''high ratio'' type jet pump of this typical application. Finally, the experimental test program following the sim of this research is briefly described

  1. Cryogenic magnet tests for the LHC process operation using web-based tools and facilities

    CERN Document Server

    Hemelsoet, G H; Chohan, V; Veyrunes, E

    2005-01-01

    For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance test of its 1706 Cryo-magnets in cryogenic conditions in a purpose-built facility at CERN. Several teams ensure the proper operation of the infrastructure on a round the clock basis. The cold test part is one of the key elements amongst many other essential activities requiring magnet transport and connections/disconnections, cryogenic preparation and pumping, cooling down to 1.9 K as well warm up before disconnection & removal. All these operations involve multi-tasking and usage of 12 test benches with nominal turn-round time per dipole magnet of 120 hours. It also involves multiple teams of industrial contractors, a support contract for cryogenics operation, CERN staff in magnet testing Operation, aided by a large external collaboration of visiting staff for round the clock operation. This paper gives a flavour of the operation and exposes the software tools that were necessary, designed and developed t...

  2. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Y.; Nakagami, Y.; Fujii, H.; Shibanai, H.

    1980-01-01

    Two 1,175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  3. Single-phase sodium pump model for LMFBR thermal-hydraulic analysis

    International Nuclear Information System (INIS)

    Madni, I.K.; Cazzoli, E.G.; Agrawal, A.K.

    1979-01-01

    A single-phase, homologous pump model has been developed for simulation of safety-related transients in LMFBR systems. Pump characteristics are modeled by homologous head and torque relations encompassing all regimes of operation. These relations were derived from independent model test results with a centrifugal pump of specific speed equal to 35 (SI units) or 1800 (gpm units), and are used to analyze the steady-state and transient behavior of sodium pumps in a number of LMFBR plants. Characteristic coefficients for the polynomials in all operational regimes are provided in a tabular form. The speed and flow dependence of head is included through solutions of the impeller and coolant dynamic equations. Results show the model to yield excellent agreement with experimental data in sodium for the FFTF prototype pump, and with vendor calculations for the CRBR pump. A sample pipe rupture calculation is also performed to demonstrate the necessity for modeling the complete pump characteristics

  4. Aging and low-flow degradation of auxilary feedwater pumps

    International Nuclear Information System (INIS)

    Adams, M.L.

    1992-01-01

    This paper documents the results of research done under the auspices of the Nuclear Regulatory Commission Nuclear Plant Aging Research Program. It examines the degradation imparted to safety related Auxiliary Feedwater System pumps at nuclear plants due to the low flow operation. The Auxiliary Feedwater (AFW) System is normally a stand-by system. As such it is operated most often in the test mode. Since few plants are equipped with full flow test loops, most testing is accomplished at minimum flow conditions in pump by-pass lines. It is the vibration and hydraulic forces generated at low flow conditions that have been shown to be the major causes of AFW pump aging and degradation. The wear can be manifested in a number of ways, such as impeller or diffuser breakage, thrust bearing and/or balance device failure due to excessive loading, cavitation damage on such stage impellers, increase seal leakage or failure, sear injection piping failure, shaft or coupling breakage, and rotating element seizure

  5. Aging and low-flow degradation of auxiliary feedwater pumps

    International Nuclear Information System (INIS)

    Adams, M.L.

    1991-01-01

    This paper documents the results of research done under the auspices of the Nuclear Regulatory Commission Nuclear Plant Aging Research Program. It examines the degradation imparted to safety Auxiliary Feedwater System pumps at nuclear plants due to the low flow operation. The Auxiliary Feedwater (AFW) System is normally a stand-by system. As such it is operated most often in the test mode. Since few plants are equipped with full flow test loops, most testing is accomplished at minimum flow conditions in pump by-pass lines. It is the vibration and hydraulic forces generated at low flow conditions that have been shown to be the major causes of AFW pump aging and degradation. The wear can be manifested in a number of ways, such as impeller or diffuser breakage, thrust bearing and/or balance device failure due to excessive loading, cavitation damage on such stage impellers, increase seal leakage or failure, sear injection piping failure, shaft or coupling breakage, and rotating element seizure

  6. Flow-induced vibration characteristics of the BWR/5-201 jet pump

    International Nuclear Information System (INIS)

    LaCroix, L.V.

    1982-09-01

    A General Electric boiling water reactor BWR/5-201 jet pump was tested for flow-induced vibration (FIV) characteristics in the Large Steam Water Test Facility at Moss Landing, CA, during the period June-July 1978. High level periodic FIV were observed at reactor operating conditions (1027 psia, 532 0 F and prototypical flow rates) for the specific single jet pump assembly tested. High level FIV of similar amplitude and character have been shown capable of damaging jet pump components and associated support hardware if allowed to continue unchecked. High level FIV were effectively suppressed in two special cases tested: (1) lateral load (>500 lb) at the mixer to diffuser slip joint; and (2) a labyrinth seal (5 small, circumferential grooves) on the mixer at the slip joint. Stability criteria for the particular jet pump tested were developed from test data. A cause-effect relationship between the dynamic pressure within the slip joint and the jet pump vibration was established

  7. Studies of cryocooler based cryosorption pump with activated carbon panels operating at 11K

    International Nuclear Information System (INIS)

    Kasthurirengan, S; Behera, Upendra; Gangradey, Ranjana; Udgata, Swarup; Krishnamoorthy, V

    2012-01-01

    Cryosorption pump is the only solution for pumping helium and hydrogen in fusion reactors. It is chosen because it offers highest pumping speed as well as the only suitable pump for the harsh environments in a tokamak. Towards the development of such cryosorption pumps, the optimal choice of the right activated carbon panels is essential. In order to characterize the performance of the panels with indigenously developed activated carbon, a cryocooler based cryosorption pump with scaled down sizes of panels is experimented. The results are compared with the commercial cryopanel used in a CTI cryosorption (model: Cryotorr 7) pump. The cryopanel is mounted on the cold head of the second stage GM cryocooler which cools the cryopanel down to 11K with first stage reaching about ∼50K. With no heat load, cryopump gives the ultimate vacuum of 2.1E-7 mbar. The pumping speed of different gases such as nitrogen, argon, hydrogen, helium are tested both on indigenous and commercial cryopanel. These studies serve as a bench mark towards the development of better cryopanels to be cooled by liquid helium for use with tokamak.

  8. Sudden venting test of an emergency bearing for the magnet bearing type compound molecular pump

    International Nuclear Information System (INIS)

    Hiroki, Seiji; Abe, Tetsuya; Murakami, Yoshio; Okamoto, Masatomo; Iguchi, Masashi; Nakamura, Jyunichi; Nakazeki, Tsugito.

    1995-01-01

    The vacuum evacuation system for nuclear fusion reactors bears the role of exhausting hydrogen isotopes in large quantity together with helium continuously for long hours, and as the high vacuum pumps for this purpose, the mechanical pumps which can do continuous evacuation and decrease the quantity of staying radioactive tritium, such as turbo molecular pumps and compound molecular pumps, are promising. Because of the compatibility with tritium, oil lubrication is not desirable, accordingly, the pumps with ceramic rotating vanes and magnetic bearings are demanded. As a part of the development of a magnetic bearing type mechanical pump which can be used for nuclear fusion reactors, the compound molecular pump, in which emergency bearings were incorporated, was made for trial, and the test of sudden air intrusion was carried out, as the results, various knowledges were obtained. The constitution of the testing setup, and the test results are reported. When air was injected at the pressure rise of 3.3x10 4 Pa/s from exhaust port side, after about 2.5 s, the maximum lift of 4.2x10 3 N arose. When air was injected at the pressure rise of 2.7x10 5 Pa/s from the suction part side, after about 0.4s, the maximum lift of 6.9x10 3 N arose. In the air injection alternately from the suction port and exhaust port sides, the emergency bearings functioned normally in 10 times of the test. (K.I.)

  9. Quasi-continuously pumped operation of 2.4% doped crystalline Nd:YAG in a bounce geometry

    Science.gov (United States)

    Kubeček, Václav; Jelínek, Michal; Čech, Miroslav; Hiršl, Petr

    2009-02-01

    We report on efficient operation of highly doped 2.4 at. % crystalline Czochralski grown Nd:YAG at 1.06μm, 1.3μm and 1.4μm in a diode pumped bounce amplifier configuration under quasi-continuous pumping. At wavelength of 1064nm the linearly polarized pulses with energy of 16.8 mJ in free running regime with repetition rate of 10 Hz (optical to optical efficiency of 44.6 % and slope efficiency of 50%) and 1 mJ in passively Q-switched regime with pulse duration of 6.4 ns were generated.The passively Q switched operation at 1.3μm was also demonstrated.

  10. Alignment and operability analysis of a vertical sodium pump

    International Nuclear Information System (INIS)

    Gupta, V.K.; Fair, C.E.

    1981-01-01

    With the objective of identifying important alignment features of pumps such as FFTF, HALLAM, EBR II, PNC, PHENIX, and CRBR, alignment of the vertical sodium pump for the Clinch River Breeder Reactor Plant (CRBRP) is investigated. The CRBRP pump includes a flexibly coupled pump shaft and motor shaft, two oil-film tilting-pad hydrodynamic radial bearings in the motor plus a vertical thrust bearing, and two sodium hydrostatic bearings straddling the double-suction centrifugal impeller in the pump

  11. Centrifugal pump handbook

    CERN Document Server

    Pumps, Sulzer

    2010-01-01

    This long-awaited new edition is the complete reference for engineers and designers working on pump design and development or using centrifugal pumps in the field. This authoritative guide has been developed with access to the technical expertise of the leading centrifugal pump developer, Sulzer Pumps. In addition to providing the most comprehensive centrifugal pump theory and design reference with detailed material on cavitation, erosion, selection of materials, rotor vibration behavior and forces acting on pumps, the handbook also covers key pumping applications topics and operational

  12. Heat pumps

    CERN Document Server

    Brodowicz, Kazimierz; Wyszynski, M L; Wyszynski

    2013-01-01

    Heat pumps and related technology are in widespread use in industrial processes and installations. This book presents a unified, comprehensive and systematic treatment of the design and operation of both compression and sorption heat pumps. Heat pump thermodynamics, the choice of working fluid and the characteristics of low temperature heat sources and their application to heat pumps are covered in detail.Economic aspects are discussed and the extensive use of the exergy concept in evaluating performance of heat pumps is a unique feature of the book. The thermodynamic and chemical properties o

  13. An advanced automation system for operation of Sao Paulo pumping stations from TRANSPETRO Master Control Center - CNCO

    Energy Technology Data Exchange (ETDEWEB)

    Corcioli, Mario Sergio; Barreto, Camila Maria Benevenuto [TRANSPETRO, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Since 2000 the operations of the TRANSPETRO pumping stations in the state of Sao Paulo region began to be transferred from local control centers located at the transfer and storage terminals to the National Operational Control Center (CNCO) of TRANSPETRO, located at the headquarters of the company, in Rio de Janeiro. The proposed paper aims to presenting an overview of the automation system that was developed to enable such pumping stations to be operated from CNCO in a reliable and secure manner, focusing on tools that offer an embedded system alarms completely free of false alarms with automatic determining of the root cause, and also automatic and advanced diagnoses of problems caused by failures of hardware, human error and abnormal conditions of the process, providing the CNCO SCADA system of accurate and quality information that help operators to make decisions. The referred automation system was integrated for the first time to CNCO SCADA system in 2000, for pipeline pumps of Osvat (Sao Sebastiao - Vale do Paraiba pipeline) station at the Sao Sebastiao Terminal - northern coast of Sao Paulo region. (author)

  14. LOX/LH2 vane pump for auxiliary propulsion systems

    Science.gov (United States)

    Hemminger, J. A.; Ulbricht, T. E.

    1985-01-01

    Positive displacement pumps offer potential efficiency advantages over centrifugal pumps for future low thrust space missions. Low flow rate applications, such as space station auxiliary propulsion or dedicated low thrust orbiter transfer vehicles, are typical of missions where low flow and high head rise challenge centrifugal pumps. The positive displacement vane pump for pumping of LOX and LH2 is investigated. This effort has included: (1) a testing program in which pump performance was investigated for differing pump clearances and for differing pump materials while pumping LN2, LOX, and LH2; and (2) an analysis effort, in which a comprehensive pump performance analysis computer code was developed and exercised. An overview of the theoretical framework of the performance analysis computer code is presented, along with a summary of analysis results. Experimental results are presented for pump operating in liquid nitrogen. Included are data on the effects on pump performance of pump clearance, speed, and pressure rise. Pump suction performance is also presented.

  15. Transient two-phase performance of LOFT reactor coolant pumps

    International Nuclear Information System (INIS)

    Chen, T.H.; Modro, S.M.

    1983-01-01

    Performance characteristics of Loss-of-Fluid Test (LOFT) reactor coolant pumps under transient two-phase flow conditions were obtained based on the analysis of two large and small break loss-of-coolant experiments conducted at the LOFT facility. Emphasis is placed on the evaluation of the transient two-phase flow effects on the LOFT reactor coolant pump performance during the first quadrant operation. The measured pump characteristics are presented as functions of pump void fraction which was determined based on the measured density. The calculated pump characteristics such as pump head, torque (or hydraulic torque), and efficiency are also determined as functions of pump void fractions. The importance of accurate modeling of the reactor coolant pump performance under two-phase conditions is addressed. The analytical pump model, currently used in most reactor analysis codes to predict transient two-phase pump behavior, is assessed

  16. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop

  17. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop

  18. Detection of pump degradation

    International Nuclear Information System (INIS)

    Casada, D.A.

    1994-01-01

    There are a variety of stressors that can affect the operation of centrifugal pumps. These can generally be classified as: Mechanical; Hydraulic; Tribological; Chemical; and Other (including those associated with the pump driver). Although these general stressors are active in essentially all centrifugal pumps, the stressor level and the extent of wear and degradation can vary greatly. Parameters that affect the extent of stressor activity are manifold. In order to assure the long-term operational readiness of a pump, it is important to both understand the nature and magnitude of the specific degradation mechanisms and to monitor the performance of the pump

  19. Implementation of pre-operational version of RODOS in Slovakia

    International Nuclear Information System (INIS)

    Duranova, T.; Janko, K.

    2000-01-01

    With support of the European Commission's Echo programme ''Implementation of the Rodeos Decision Support System for Off-Site Emergency Preparation and response in the Emergency centres in Poland and the Slovak Republics' '', Rodeos was implemented in the Slovak Republic. The main objective of the project - implemented by the Consortium of Ecton and STUK, with participation of VUJE and IAE - was to accelerate the implementation of the RODOS system within national emergency preparedness arrangements in Poland and the Slovak Republic. The main elements are: procure and install the computer hardware for the RODOS; establish dedicated communication lines; install and adapt RODOS software; test and verify the operability of the whole system; develop and implement procedures for the pre-operational integration of RODOS into national emergency arrangements; develop and implement maintenance procedures; develop and implement a training programme. (author)

  20. Implementation of pre-operational version of RODOS in Slovakia

    International Nuclear Information System (INIS)

    Duranova, T.

    2001-01-01

    With support from the European Commission's ECHO programme 'Implementation of the RODOS Decision Support System for Off-Site Emergency Preparation and response in the Emergency centres in Poland and the Slovak Republic', RODOS was implemented in the Slovak Republic. The main objective of the project which was implemented by the Consortium of ENCONET and STUK, with participation of VUJE and IAE, was to accelerate the implementation of the RODOS system within national emergency preparedness arrangements in Poland and the Slovak Republic. The main elements are: procure and install the computer hardware for the RODOS; establish dedicated communication lines; install and adapt RODOS software; test and verify the operability of the whole system; develop and implement procedures for the pre-operational integration of RODOS into national emergency arrangements; develop and implement maintenance procedures; develop and implement a training programme. (author)

  1. Commissioning result of the KSTAR in-vessel cryo-pump

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Y. B.; Lee, H. J.; Park, Y.M. [National Fusion Research Institute, Daejeon (Korea, Republic of); and others

    2013-12-15

    KSTAR in-vessel cryo-pump has been installed in the vacuum vessel top and bottom side with up-down symmetry for the better plasma density control in the D-shape H-mode. The cryogenic helium lines of the in-vessel cryo-pump are located at the vertical positions from the vacuum vessel torus center 2,000 mm. The inductive electrical potential has been optimized to reduce risk of electrical breakdown during plasma disruption. In-vessel cryo-pump consists of three parts of coaxial circular shape components; cryo-panel, thermal shield and particle shield. The cryo-panel is cooled down to below 4.5 K. The cryo-panel and thermal shields were made by Inconel 625 tube for higher mechanical strength. The thermal shields and their cooling tubes were annealed in air environment to improve the thermal radiation emissivity on the surface. Surface of cryo-panel was electro-polished to minimize the thermal radiation heat load. The in-vessel cryo-pump was pre-assembled on a test bed in 180 degree segment base. The leak test was carried out after the thermal shock between room temperature to LN2 one before installing them into vacuum vessel. Two segments were welded together in the vacuum vessel and final leak test was performed after the thermal shock. Commissioning of the in-vessel cryo-pump was carried out using a temporary liquid helium supply system.

  2. Validation of designing tools as part of nuclear pump development process

    International Nuclear Information System (INIS)

    Klemm, T.; Sehr, F.; Spenner, P.; Fritz, J.

    2010-01-01

    Nuclear pumps are characterized by high safety standards, operational reliability as well as long life cycles. For the design process it is of common use to have a down scaled model pump to qualify operating data and simulate exceptional operating conditions. In case of modifications of the pump design compared to existing reactor coolant pumps a model pump is required to develop methods and tools to design the full scale pump. In the presented case it has a geometry scale of 1:2 regarding the full scale pump size. The experimental data of the model pump is basis for validation of methods and tools which are applied in the designing process of the full scale pump. In this paper the selection of qualified tools and the validation process is demonstrated exemplarily on a cooling circuit. The aim is to predict the resulting flow rate. Tools are chosen for different components depending on the benefit to effort ratio. For elementary flow phenomena such as fluid flow in straight pipes or gaps analytic or empirical laws can be used. For more complex flow situations numerical methods are utilized. Main focus is set on the validation process of the applied numerical flow simulation. In this case not only integral data should be compared, it is also necessary to validate local flow structure of numerical flow simulation to avoid systematic errors in CFD Model generation. Due to complex design internal flow measurements are not possible. On that reason simple comparisons of similar flow test cases are used. Results of this study show, that the flow simulation data closely match measured integral pump and test case data. With this validation it is now possible to qualify CFD simulations as a design tool for the full scale pump in similar cooling circuit. (authors)

  3. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  4. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  5. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  6. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''Q''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''T''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''U''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  12. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  13. Design, in-sodium testing and performance evaluation of annular linear induction pump for a sodium cooled fast reactor

    International Nuclear Information System (INIS)

    Nashine, B.K.; Rao, B.P.C.

    2014-01-01

    Highlights: • Derivation of applicable design equations. • Design of an annular induction pump based on these equations. • Testing of the designed pump in a sodium test facility. • Performance evaluation of the designed pump. - Abstract: Annular linear induction pumps (ALIPs) are used for pumping electrically conducting liquid metals. These pumps find wide application in fast reactors since the coolant in fast reactors is liquid sodium which a good conductor of electricity. The design of these pumps is usually done using equivalent circuit approach in combination with numerical simulation models. The equivalent circuit of ALIP is similar to that of an induction motor. This paper presents the derivation of equivalent circuit parameters using first principle approach. Sodium testing of designed ALIP using the equivalent circuit approach is also described and experimental results of the testing are presented. Comparison between experimental and analytical calculations has also been carried out. Some of the reasons for variation have also been listed in this paper

  14. RA Reactor operation and maintenance (I-IX), part V, Task 3.08/04-06, Refurbishment of the heavy water pumps

    International Nuclear Information System (INIS)

    Zecevic, V.; Nikolic, M.; Milic, J.

    1963-12-01

    In addition to detailed instructions for maintenance and repair of the heavy water pumps at the RA reactor this document includes nine annexes. They are as follows: cleaning the heavy water pump Avala with distilled water; instructions for repair of the pump CEN-132 (two annexes); list of operating characteristics of the pumps before repair; conclusions of the experts concerning the worn out bearings of the heavy water pump Avala, with the analysis of the stellite layer; report on the completed repair actions on the pumps Avala and CEN-132; report on the measurements done on the pump Avala; and the certificate concerning inspection of the pump

  15. Test study on safety features of station blackout accident for nuclear main pump

    International Nuclear Information System (INIS)

    Liu Xiajie; Wang Dezhong; Zhang Jige; Liu Junsheng; Yang Zhe

    2009-01-01

    The theoretical and experimental studies of reactor coolant pump accidents encountered nation-wide and world-wide were described. To investigate the transient hydrodynamic performance of reactor coolant pump (RCP) during the period of rotational inertia in the station blackout accident, some theoretical and experimental studies were carried out, and the analysis of the test results was presented. The experiment parameters, conditions and test methods were introduced. The flow-rate, rotate speed and vibrations were analyzed emphatically. The quadruplicate polynomial curve equation was used to simulate the flow-rate,rotate speed along with time. The test results indicate that the flow-rate and rotator speed decrease rapidly at the very beginning of cut power and the test results accord with the regulation of safety standard. The vibrant displacement of bearing seat is intensified at the moment of lose power, but after a certain period rotor shaft libration changes. The test and analysis results help to understand the hydrodynamic performance of nuclear primary pump under lost of power accident, and provide the basic reference for safety evaluation. (authors)

  16. Acute gallbladder torsion - a continued pre-operative diagnostic dilemma

    Directory of Open Access Journals (Sweden)

    Desrochers Randal

    2011-04-01

    Full Text Available Abstract Acute gallbladder volvulus continues to remain a relatively uncommon process, manifesting itself usually during exploration for an acute surgical abdomen with a presumptive diagnosis of acute cholecystitis. The pathophysiology is that of mechanical organo-axial torsion along the gallbladder's longitudinal axis involving the cystic duct and cystic artery, and with a pre-requisite of local mesenteric redundancy. The demographic tendency is septua- and octo-genarians of the female sex, and its overall incidence is increasing, this being attributed to increasing life expectancy. We discuss two cases of elderly, fragile women presenting to the emergency department complaining of sudden onset right upper quadrant abdominal pain. Their subsequent evaluation suggested acute cholecystitis. Ultimately both were taken to the operating room where the correct diagnosis of gallbladder torsion was made. Pre-operative diagnosis continues to be a major challenge with only 4 cases reported in the literature diagnosed with pre-operative imaging; the remainder were found intra-operatively. Consequently, a delay in diagnosis can have devastating patient outcomes. Herein we propose a necessary high index of suspicion for gallbladder volvulus in the outlined patient demographic with symptoms and signs mimicking acute cholecystitis.

  17. Safety Culture in Pre-operational Phases of Nuclear Power Plant Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-09-15

    An abundance of information exists on safety culture related to the operational phases of nuclear power plants; however, pre-operational phases present unique challenges. This publication focuses on safety culture during pre-operational phases that span the interval from before a decision to launch a nuclear power programme to first fuel load. It provides safety culture insights and focuses on eight generic issues: safety culture understanding; multicultural aspects; leadership; competencies and resource competition; management systems; learning and feedback; cultural assessments; and communication. Each issue is discussed in terms of: specific challenges; desired state; approaches and methods; and examples and resources. This publication will be of interest to newcomers and experienced individuals faced with the opportunities and challenges inherent in safety culture programmes aimed at pre-operational activities.

  18. Safety Culture in Pre-operational Phases of Nuclear Power Plant Projects

    International Nuclear Information System (INIS)

    2012-01-01

    An abundance of information exists on safety culture related to the operational phases of nuclear power plants; however, pre-operational phases present unique challenges. This publication focuses on safety culture during pre-operational phases that span the interval from before a decision to launch a nuclear power programme to first fuel load. It provides safety culture insights and focuses on eight generic issues: safety culture understanding; multicultural aspects; leadership; competencies and resource competition; management systems; learning and feedback; cultural assessments; and communication. Each issue is discussed in terms of: specific challenges; desired state; approaches and methods; and examples and resources. This publication will be of interest to newcomers and experienced individuals faced with the opportunities and challenges inherent in safety culture programmes aimed at pre-operational activities.

  19. Development of a hardware-in-the-loop-test rig to verify the reliability of oil burner pumps. Application by the use of biocide in domestic heating oil; Entwicklung eines Hardware-in-the-loop Pruefstands zum Nachweis der Betriebssicherheit von Oelbrennerpumpen. Anwendungen bei Einsatz von Biozidadditiven

    Energy Technology Data Exchange (ETDEWEB)

    Rheinberg, Oliver van; Lukito, Jayadi; Liska, Martin [Oel-Waerme-Institut gGmbH (OWI), Aachen-Herzogenrath (Germany)

    2009-09-15

    Within this project, a hardware-in-the-loop test rig has been developed to investigate the influence of different fuels on the reliability of oil burner pumps. The test rig is constructed with commercial burner components. One test rig consists of four pump cycles, where the fuel recirculates for max. 2000 h. Low powered electric motors of 90 Watts have been used deliberately, so that the apparatus is more sensitive to failure due to an increase in pump load. A practise relevant intermittent operating mode has been implemented for the simulation of real operation characteristics. The measured variable and evaluation parameters are start-up torque, intake pressure, fuel pump pressure and temperature. Operation failures of oil burner pumps in the field, due to an over-additisation of biocides, have been observed. These failures could be reproducibly simulated on the pump test stands. The results of the project are a redefinition of limits of biocide concentration and the development of new biocides, which are suitable for use in domestic heating oil with a content of up to 20 % Fatty-Acid-Methyl-Ester. (orig.)

  20. Dynamic modeling and dynamical analysis of pump-turbines in S-shaped regions during runaway operation

    International Nuclear Information System (INIS)

    Zhang, Hao; Chen, Diyi; Wu, Changzhi; Wang, Xiangyu; Lee, Jae-Myung; Jung, Kwang-Hyo

    2017-01-01

    Highlights: • Novel dynamic model of a pump-turbine in S-shaped regions is proposed. • A stability criterion of runaway point is given. • Global dynamic characteristics of the pump-turbine are investigated. • Effects of the slopes of the characteristic curve on the stability are studied. - Abstract: There is a region of pump-turbine operation, often called the S-shaped region, in which one unit rotational speed corresponds to three unit flows or torques. In this paper, the dynamic model of the pump-turbine in S-shaped regions is established by introducing the nonlinear piecewise function of relative parameters. Then, the global bifurcation diagrams of the pump-turbine are presented to analyze its dynamic characteristics in the S-shaped regions. Meanwhile, a stability criterion of runaway point is given based on the established theoretical model. The numerical experiments are conducted on the model and the results are in good agreement with the theoretical analysis. Furthermore, the effects of the characteristic curve slopes on the stability of the pump-turbine are studied by an innovative use of the three-dimensional bifurcation diagrams. Finally, the factors influencing the runaway stability of pump-turbines are also discussed, based on the dynamic analysis.

  1. Trouble diagnostic system for pumps used in thermal and nuclear power plant

    International Nuclear Information System (INIS)

    Amano, K.; Hayashi, M.; Takagi, M.; Katsura, H.

    1995-01-01

    Most power plants have been operated under severe conditions to meet the diversification in electricity supply and demand. Therefore, it has become an important objective to keep the pumps under maintenance and control which necessitates a more reliable diagnostic system. With this in mind, the authors set out to perform the simulation tests of abnormal operation using a model pump, and have developed the diagnostic system for pumps based on vibration and process data. The main features of the system are 1) parallel processing of data acquisition and the diagnosis and 2) guidance function for the abnormal operation. The system has been applied to an actual pump to detect a bearing damage and set up at the nuclear power plant. (author)

  2. A new self-scheduling strategy for integrated operation of wind and pumped-storage power plants in power markets

    International Nuclear Information System (INIS)

    Varkani, Ali Karimi; Daraeepour, Ali; Monsef, Hassan

    2011-01-01

    Highlights: → A strategy for integrated operation of wind and pumped-storage plants is proposed. → Participation of both plants in energy and ancillary service markets is modeled. → The uncertainty of wind production is modeled by a novel probabilistic function. → The proposed strategy is tested on a real case in the Spanish electricity market. -- Abstract: Competitive structure of power markets causes various challenges for wind resources to participate in these markets. Indeed, production uncertainty is the main cause of their low income. Thus, they are usually supported by system operators, which is in contrast with the competitive paradigm of power markets. In this paper, a new strategy for increasing the profits of wind resources is proposed. In the suggested strategy, a Generation Company (GenCo), who owns both wind and pumped-storage plants, self-schedules the integrated operation of them regarding the uncertainty of wind power generation. For presenting an integrated self-schedule and obtaining a real added value of the strategy, participation of the GenCo in energy and ancillary service markets is modeled. The self-scheduling strategy is based on stochastic programming techniques. Outputs of the problem include generation offers in day-ahead energy market and ancillary service markets, including spinning and regulation reserve markets. A Neural Network (NN) based technique is used for modeling the uncertainty of wind power production. The proposed strategy is tested on a real wind farm in mainland, Spain. Moreover, added value of the strategy is presented in different conditions of the market.

  3. Operation of the optically pumped polarized H- source at LAMPF

    International Nuclear Information System (INIS)

    York, R.L.; Tupa, D.; Swenson, D.R.; van Dyck, O.B.

    1991-01-01

    We report on the first five months of operation of the Optically Pumped Polarized Ion Source (OPPIS) for the nuclear physics research program at LAMPF. The LAMPF OPPIS is unique in using Ti: Sapphire lasers to polarize the potassium charge-exchange medium, and until recently was unique in using a superconducting magnet in the ECR source and polarizer regions. The ECR extraction electrode biasing arrangement is also unique. Typical performance was 25 microamps of peak current (measured at 750 keV) with 55% beam polarization or 15 microamps at 62%. Ion source availability was greater than 90%. We also report our planned improvements in preparation for research operation in May of 1991. 3 refs., 4 figs

  4. WIPP - Pre-Licensing and Operations: Developer and Regulator Perspectives

    International Nuclear Information System (INIS)

    Peake, Tom; Patterson, R.

    2014-01-01

    The Waste Isolation Pilot Plant (WIPP) is a disposal system for defense-related transuranic (TRU) radioactive waste. Developed by the Department of Energy (DOE), WIPP is located in Southeastern New Mexico: radioactive waste is disposed of 2,150 feet underground in an ancient layer of salt with a total capacity of 6.2 million cubic feet of waste. Congress authorized the development and construction of WIPP in 1980 for the express purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes resulting from the defense activities and programs of the United States. This paper makes a historical review of the site development, site operations (waste disposal operations started in 1999), communications between US EPA and DOE, the chronology of pre-licensing and pre-operations, the operational phase and the regulatory challenges, and the lessons learned after 12 years of operations

  5. Test results of distributed ion pump designs for the PEP-II Asymmetric B-Factory collider

    Energy Technology Data Exchange (ETDEWEB)

    Calderon, M.; Holdener, F.; Peterson, D. [Lawrence Livermore National Lab., CA (United States)] [and others

    1994-07-01

    The testing facility measurement methods and results of prototype distributed ion pump (DIP) designs for the PEP-II B-Factory High Energy Ring are presented. Two basic designs with 5- or 7-anode plates were tested at LLNL with penning cell sizes of 15, 18, and 21 mm. Direct comparison of 5- and 7-plate anodes with 18 mm holes shows increased pumping speed with the 7-plate design. The 5-plate, 18 mm and 7-plate, 15 mm designs both gave an average pumping speed of 135 1/s/m at 1 {times} 10{sup {minus}8} Torr nitrogen base pressure in a varying 0.18 T peak B-field. Comparison of the three hole sizes indicates that cells smaller than the 15 mm tested can be efficiently used to obtain higher pumping speeds for the same anode plate sizes used.

  6. Test results of distributed ion pump designs for the PEP-II Asymmetric B-Factory collider

    International Nuclear Information System (INIS)

    Calderon, M.; Holdener, F.; Peterson, D.

    1994-07-01

    The testing facility measurement methods and results of prototype distributed ion pump (DIP) designs for the PEP-II B-Factory High Energy Ring are presented. Two basic designs with 5- or 7-anode plates were tested at LLNL with penning cell sizes of 15, 18, and 21 mm. Direct comparison of 5- and 7-plate anodes with 18 mm holes shows increased pumping speed with the 7-plate design. The 5-plate, 18 mm and 7-plate, 15 mm designs both gave an average pumping speed of 135 1/s/m at 1 x 10 -8 Torr nitrogen base pressure in a varying 0.18 T peak B-field. Comparison of the three hole sizes indicates that cells smaller than the 15 mm tested can be efficiently used to obtain higher pumping speeds for the same anode plate sizes used

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis

  9. Vacuum pumping of tritium in fusion power reactors

    International Nuclear Information System (INIS)

    Coffin, D.O.; Walthers, C.R.

    1979-01-01

    Compound cryopumps of three different designs will be tested with deuterium-tritium (DT) mixtures under simulated fusion reactor conditions at the Tritium Systems Test Assembly (TSTA) now being constructed at the Los Alamos Scientific Laboratory (LASL). The first of these pumps is already in operation, and its preliminary performance is presented. The supporting vacuum facility necessary to regenerate these fusion facility cryopumps is also described. The next generation of fusion system vacuum pumps may include non-cryogenic or conventional-cryogenic hybrid systems, several of which are discussed

  10. Pre-operative Functional Cardiovascular Reserve Is Associated with Acute Kidney Injury after Intervention.

    Science.gov (United States)

    Saratzis, A; Shakespeare, J; Jones, O; Bown, M J; Mahmood, A; Imray, C H E

    2017-05-01

    Acute kidney injury (AKI) is a common complication after endovascular intervention, associated with poor short and long-term outcomes. However, the mechanisms underlying AKI development remain poorly understood. The impact of pre-existing cardiovascular disease and low cardiovascular reserve (CVR) in AKI is unclear; it remains unknown whether AKI is primarily related to pre-existing comorbidity or to procedural parameters. The association between CVR and AKI after EVAR was therefore assessed. This is a case control study. From a database of 484 patients, 292 undergoing elective endovascular aneurysm repair (EVAR) of an infrarenal abdominal aortic aneurysm (AAA) in two tertiary centres were included. Of these, 73 patients who had developed AKI after EVAR were case matched, based on pre-operative estimated glomerular filtration rate (eGFR; within 5 mL/min/1.73 m 2 ) and age, with patients who had not developed AKI. Cardiopulmonary exercise testing (CPET) was used to assess CVR using the anaerobic threshold (AT). Development of AKI was defined using the Kidney Disease Improving Outcomes (KDIGO) guidance. Associations between CVR (based on AT levels) and AKI development were then analysed. Pre-operative AT levels were significantly different between those who did and did not develop AKI (12.1±2.9 SD vs. 14.8±3.0 mL/min/kg, p < .001). In multivariate analysis, a higher level of AT (per 1 mL/min/kg) was associated with a lower odds ratio (OR) of 0.72 (95% CI, 0.63-0.82, p < .001), relative to AKI development. A pre-operative AT level of < 11 mL/min/kg was associated with post-operative AKI development in adjusted analysis, with an OR of 7.8 (95% CI, 3.75-16.51, p < .001). The area under the curve (receiver operating characteristic) for AT as a predictor of post-operative AKI was 0.81 (standard error, 0.06, 95% CI, 0.69-0.93, p < .001). Poor CVR was strongly associated with the development of AKI. This provides pathophysiological insights into the

  11. Reactor coolant pump seals: improving their performance

    International Nuclear Information System (INIS)

    Pothier, N.E.; Metcalfe, R.

    1986-06-01

    Large CANDU plants are benefitting from transient-resistant four-year reliable reactor coolant pump seal lifetimes, a direct result of AECL's 20-year comprehensive seal improvement program involving R and D staff, manufacturers, and plant designers and operators. An overview of this program is presented, which covers seal modification design, testing, post-service examination, specialized maintenance and quality control. The relevancy of this technology to Light Water Reactor Coolant Pump Seals is also discussed

  12. Linac pre-injector

    CERN Multimedia

    CERN PhotoLab

    1965-01-01

    New accelerating column of the linac pre-injector, supporting frame and pumping system. This new system uses two mercury diffusion pumps (in the centre) and forms part of the modifications intended to increase the intensity of the linac. View taken during assembly in the workshop.

  13. Reactor coolant purification system circulation pumps (CUW pumps)

    International Nuclear Information System (INIS)

    Tsutsui, Toshiaki

    1979-01-01

    Coolant purification equipments for BWRs have been improved, and the high pressure purifying system has become the main type. The quantity of purifying treatment also changed to 2% of the flow rate of reactor feed water. As for the circulation pumps, canned motor pumps are adopted recently, and the improvements of reliability and safety are attempted. The impurities carried in by reactor feed water and the corrosion products generated in reactors and auxiliary equipments are activated by neutron irradiation or affect heat transfer adversely, adhering to fuel claddings are core structures. Therefore, a part of reactor coolant is led to the purification equipments, and returned to reactors after the impurities are eliminated perfectly. At the time of starting and stopping reactors, excess reactor water and the contaminated water from reactors are transferred to main condenser hot wells or waste treatment systems. Thus the prescribed water quality is maintained. The operational modes of and the requirements for the CUW pumps, the construction and the features of the canned motor type CUW pumps are explained. Recently, a pump operated for 11 months without any maintenance has been disassembled and inspected, but the wear of bearings has not been observed, and the high reliability of the pump has been proved. (Kako, I.)

  14. Pre-transplantation glucose testing for predicting new-onset diabetes mellitus after renal transplantation.

    Science.gov (United States)

    Ramesh Prasad, G V; Huang, M; Bandukwala, F; Nash, M M; Rapi, L; Montada-Atin, T; Meliton, G; Zaltzman, J S

    2009-02-01

    New-onset diabetes after renal transplantation (NODAT) adversely affects graft and patient survival. However, NODAT risk based on pre-transplant blood glucose (BG) levels has not been defined. Our goal was to identify the best pre-transplant testing method and cut-off values. We performed a case-control analysis of non-diabetic recipients who received a live donor allograft with at least 6 months post-transplant survival. Pre-transplant glucose abnormalities were excluded through 75 g oral glucose tolerance testing (OGTT) and random BG (RBG) measurement. NODAT was defined based on 2003 Canadian Diabetes Association criteria. Multivariate logistic and Cox regression analysis was performed to determine independent predictor variables for NODAT. Receiver-operating-characteristic (ROC) curves were constructed to determine threshold BG values for diabetes risk. 151 recipients met initial entry criteria. 12 had pre-transplant impaired fasting glucose and/or impaired glucose tolerance, among who 7 (58%) developed NODAT. In the remaining 139, 24 (17%) developed NODAT. NODAT risk exceeded 25% for those with pre-transplant RBG > 6.0 mmol/l and 50% if > 7.2 mmol/l. Pre-transplant RBG provided the highest AUC (0.69, p = 0.002) by ROC analysis. Increasing age (p = 0.025), acute rejection (p = 0.011), and RBG > 6.0 mmol/l (p = 0.001) were independent predictors of NODAT. Pre-transplant glucose testing is a specific marker for NODAT. Patients can be counseled of their incremental risk even within the normal BG range if the OGTT is normal.

  15. The ultrastructure of tumor cells in patients with rectal cancer after pre-operative irradiation and intra-operative cryotherapy

    International Nuclear Information System (INIS)

    Vyinnik, Yu.O.; Kotenko, O.Je.; Nevzorov, V.P.; Chyibyisov, L.P.

    2000-01-01

    Electronic microscopy of the tumor cells was performed to confirm the efficacy of combined pre-operative gamma-therapy and intraoperative cryotherapy (CT). Pre-operative irradiation at the dose of 20 Gy accompanied by intra-operative cryotherapy caused the changes in the ultrastructure, the depth and degree of which allow to consider them destructive and irreversible

  16. Boiler recirculation pumps for nuclear power stations - present state of development. Directions for planning, operational experience

    International Nuclear Information System (INIS)

    Mattias, H.B.

    1976-01-01

    Boiler recirculation pumps are important components of modern power stations. The development of large recirculation pumps up to a driving power of 1,500 kW was faced with some problems in meeting the plant requirements. In this paper, the present state of development is dealt with. The development problems in the fields of hydrodynamics, cavitation, corrosion and erosion are dealt with as well as the problems of the design of the casing with regard to thermodynamics and strength. Finally, operational experience with the boiler recirculation pump for 600 MW power stations will be reported on. (orig./AK) [de

  17. Pump characteristics and applications

    CERN Document Server

    Volk, Michael

    2013-01-01

    Providing a wealth of information on pumps and pump systems, Pump Characteristics and Applications, Third Edition details how pump equipment is selected, sized, operated, maintained, and repaired. The book identifies the key components of pumps and pump accessories, introduces the basics of pump and system hydraulics as well as more advanced hydraulic topics, and details various pump types, as well as special materials on seals, motors, variable frequency drives, and other pump-related subjects. It uses example problems throughout the text, reinforcing the practical application of the formulae

  18. CFD Analysis of a Centrifugal Pump with Supercritical Carbon Dioxide as a Working Fluid

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seong Gu; Lee, Jeong Ik; Ahn, Yoonhan; Lee, Jekyoung [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Cha, Jae Eun [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Addad, Yacine [Khalifa Univ. of Science Technology and Research, Abu Dhabi (United Arab Emirates)

    2013-05-15

    The research team is conducting a S-CO{sub 2} pump experiment to obtain fundamental data for the advanced pump design and measure the overall performance of the pump near the critical point. The S-CO{sub 2} pump testing loop configuration is similar to SNL and JAEA testing loop while the operating conditions and focus of experiment are different from other test facilities. This paper presents the methodology of a 3-dimensional flow analysis for the S-CO{sub 2} pump by using the commercial CFD code. In Figure 2, the results at the 1.5kg/s mass flow rate seems to be close agreement between the CFD efficiency and S-CO{sub 2} test results. In the low mass flow rate of 1.0kg/s, CFD predicted 17∼25% higher efficiency than the test result. In the real test facility, the steel structure of pump is not an adiabatic wall and also the mechanical losses such as suction, blade loading and leakage exist in the pump. The reason why CFD analysis showed higher pump efficiency at the low mass flow is the above mentioned losses were excluded from the model. However, as the mass flow rate increases these have less effect on the efficiency. If the heat transfer through the structure and pump losses are applied in the analysis, other losses can be estimated. From the S-CO{sub 2} pump experiment, more data will be obtained and compared to the CFD analyses under the methodology presented in this paper. After the fluid behavior in the pump are well understood, these analysis results will be used for optimizing impeller for advanced S-CO{sub 2} compressor design in the future. However, it is very encouraging that even at very small mass flow rate the efficiency of S-CO{sub 2} pump near the critical point operation is very high compared to the manufacturer water test. The reason behind such phenomenon will be more carefully studied in the future.

  19. High heat flux testing impact on the Tore Supra toroidal pumped limiter achievement

    International Nuclear Information System (INIS)

    Schlosser, J.; Escourbiac, F.; Cordier, J.J.; Mitteau, R.; Durocher, A.; Grosman, A.

    2003-01-01

    The toroidal pumped limiter of Tore Supra is made of 576 elementary high heat flux (HHF) cooled plasma-facing components (PFCs) and designed to sustain 10 MW/m 2 in steady state. One of the main technical difficulties is to ensure a high quality of the bond between the carbon fiber composite armor tile and the water-cooled heat sink due to the high thermal stresses that develop at the bond during operation. Consequently, a HHF facility able to reproduce in service operation of PFCs is required all along the development and manufacturing route. In Europe, the FE200 facility (electron beam, 200 kW, France) operating since 1991, was extensively used for such a development. A first testing campaign in 1995 was devoted to the qualification of this bond: AMC technology from Plansee GmbH was selected. Afterwards, a second campaign on scale-one elements (1996) allowed an optimization of the element design and series production to be launched. During the mass production, a non-destructive control process - cheaper and faster than HHF testing - based on infrared characterization was routinely operated on 100% of the manufactured elements. Strong variability of the bond quality was observed and a repair process allowing the replacement of deficient tiles was developed. In 2000 and 2001, 2 campaigns of HHF testing were launched to correlate the non-destructive measurements and to optimize and validate the repair process. This was done, in two steps, with success. This yielded moreover interesting information for qualifying both tests across each other and also to analyze the fatigue evolution of the bond. The qualification and the achievement of the Tore Supra limiter has greatly been made possible by such HHF tests, which appears as essential before and during PFC manufacturing. (authors)

  20. Heat pump concepts for nZEB Technology developments, design tools and testing of heat pump systems for nZEB in the USA: Country report IEA HPT Annex 40 Task 2, Task 3 and Task 4 of the USA

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, Van D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Payne, W. Vance [National Inst. of Standards and Technology (NIST), Gaithersburg, MD (United States); Ling, Jiazhen [Univ. of Maryland, College Park, MD (United States); Radermacher, Reinhard [Univ. of Maryland, College Park, MD (United States)

    2015-12-01

    The IEA HPT Annex 40 "Heat pump concepts for Nearly Zero Energy Buildings" deals with the application of heat pumps as a core component of the HVAC system for Nearly or Net Zero energy buildings (nZEB). This report covers Task 2 on the system comparison and optimisation and Task 3 dedicated to the development of adapted technologies for nZEB and field monitoring results of heat pump systems in nZEB. In the US team three institutions are involved and have worked on the following projects: The Oak Ridge National Laboratory (ORNL) will summarize development activities through the field demonstration stage for several integrated heat pump (IHP) systems electric ground-source (GS-IHP) and air-source (AS-IHP) versions and an engine driven AS-IHP version. The first commercial GS-IHP product was just introduced to the market in December 2012. This work is a contribution to Task 3 of the Annex. The University of Maryland will contribute a software development project to Task 2 of the Annex. The software ThermCom evaluates occupied space thermal comfort conditions accounting for all radiative and convective heat transfer effects as well as local air properties. The National Institute of Standards and Technology (NIST) is working on a field study effort on the NIST Net Zero Energy Residential Test Facility (NZERTF). This residential building was constructed on the NIST campus and officially opened in summer 2013. During the first year, between July 2013 and June 2014, baseline performance of the NZERTF was monitored under a simulated occupancy protocol. The house was equipped with an air-to-air heat pump which included a dedicated dehumidification operating mode. Outdoor conditions, internal loads and modes of heat pump operation were monitored. Field study results with respect to heat pump operation will be reported and recommendations on heat pump optimization for a net zero energy building will be provided. This work is a contribution to Task 3 of the Annex.

  1. Monitoring the ground water level change during the pump test by using the Electric resistivity tomography

    Science.gov (United States)

    Hsu, H.; Chang, P. Y.; Yao, H. J.

    2017-12-01

    For hydrodynamics study of the unconfined aquifer in gravel formation, a pumping test was established to estimate the hydraulic conductivity in the midstream of Zhoushui River in Taiwan. The hydraulic parameters and the cone of depression could be estimated by monitoring the groundwater drawdown in an observation well which was in a short distance far from the pumping well. In this study we carried out the electric resistivity image monitoring during the whole pumping test. The electric resistivity data was measured with the surface and downhole electrodes which would produce a clear subsurface image of groundwater level through a larger distance than the distance between pumping and observation wells. The 2D electric image could also describe how a cone of depression truly created at subsurface. The continuous records could also show the change of groundwater level during the whole pumping test which could give a larger scale of the hydraulic parameters.

  2. Efficiency of the pre-heater against flow rate on primary the beta test loop

    International Nuclear Information System (INIS)

    Edy Sumarno; Kiswanta; Bambang Heru; Ainur R; Joko P

    2013-01-01

    Calculation of efficiency of the pre-heater has been carried out against the flow rate on primary the BETA Test Loop. BETA test loop (UUB) is a facilities of experiments to study the thermal hydraulic phenomenon, especially for thermal hydraulic post-LOCA (Lost of Coolant Accident). Sequences removal on the BETA Test Loop contained a pre-heater that serves as a getter heat from the primary side to the secondary side, determination of efficiency is to compare the incoming heat energy with the energy taken out by a secondary fluid. Characterization is intended to determine the performance of a pre-heater, then used as tool for analysis, and as a reference design experiments. Calculation of efficiency methods performed by operating the pre-heater with fluid flow rate variation on the primary side. Calculation of efficiency on the results obtained that the efficiency change with every change of flow rate, the flow rate is 71.26% on 163.50 ml/s and 60.65% on 850.90 ml/s. Efficiency value can be even greater if the pre-heater tank is wrapped with thermal insulation so there is no heat leakage. (author)

  3. Pre-test analysis results of a PWR steel lined pre-stressed concrete containment model

    International Nuclear Information System (INIS)

    Basha, S.M.; Ghosh, Barnali; Patnaik, R.; Ramanujam, S.; Singh, R.K.; Kushwaha, H.S.; Venkat Raj, V.

    2000-02-01

    Pre-stressed concrete nuclear containment serves as the ultimate barrier against the release of radioactivity to the environment. This ultimate barrier must be checked for its ultimate load carrying capacity. BARC participated in a Round Robin analysis activity which is co-sponsored by Sandia National Laboratory, USA and Nuclear Power Engineering Corporation Japan for the pre-test prediction of a 1:4 size Pre-stressed Concrete Containment Vessel. In house finite element code ULCA was used to make the test predictions of displacements and strains at the standard output locations. The present report focuses on the important landmarks of the pre-test results, in sequential terms of first crack appearance, loss of pre-stress, first through thickness crack, rebar and liner yielding and finally liner tearing at the ultimate load. Global and local failure modes of the containment have been obtained from the analysis. Finally sensitivity of the numerical results with respect to different types of liners and different constitutive models in terms of bond strength between concrete and steel and tension-stiffening parameters are examined. The report highlights the important features which could be observed during the test and guidelines are given for improving the prediction in the post test computation after the test data is available. (author)

  4. Summary of Test Results From a 1 kW(sub e)-Class Free-Piston Stirling Power Convertor Integrated With a Pumped NaK Loop

    Science.gov (United States)

    Briggs, Maxwell H.; Geng, Steven M.; Pearson, J. Boise; Godfroy, Thomas J.

    2010-01-01

    As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1 kW class free-piston Stirling convertors was modified to operate with a NaK liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The tests included performance mapping the convertors over various hot and cold-end temperatures, piston amplitudes and NaK flow rates; and transient test conditions to simulate various start-up and fault scenarios. Performance maps of the convertors generated using the pumped NaK loop for thermal input show increases in power output over those measured during baseline testing using electric heating. Transient testing showed that the Stirling convertors can be successfully started in a variety of different scenarios and that the convertors can recover from a variety of fault scenarios.

  5. Conceptuation of a continuously working vacuum pump train for fusion power plants

    International Nuclear Information System (INIS)

    Giegerich, Thomas; Day, Christian

    2013-01-01

    The Karlsruhe Institute of Technology (KIT) is developing a continuously working and non-cryogenic pumping solution for a demonstration power plant (DEMO). This pumping train shall cover the full operational pressure regime of a fusion reactor and is based on two pump types, namely diffusion pumps and liquid ring pumps. The whole pumping train must fulfill high safety and reliability requirements and it has to be made fully tritium compatible. In this paper, the design of a prototype pumping train and the special requirements for a DEMO machine are presented and discussed. A central feature of this pumping train is the use of a liquid metal as tritium compatible working fluid in both pump types, that leads to a pumping train which is able to cover a pressure range of 12 decades, namely from 10 −9 to 10 3 mbar. Finally, a test facility for pump testing over a wide pressure regime is described. In this facility (THESEUS), experiments with a diffusion pump have been performed and first results are presented

  6. Conceptuation of a continuously working vacuum pump train for fusion power plants

    Energy Technology Data Exchange (ETDEWEB)

    Giegerich, Thomas, E-mail: thomas.giegerich@kit.edu; Day, Christian

    2013-10-15

    The Karlsruhe Institute of Technology (KIT) is developing a continuously working and non-cryogenic pumping solution for a demonstration power plant (DEMO). This pumping train shall cover the full operational pressure regime of a fusion reactor and is based on two pump types, namely diffusion pumps and liquid ring pumps. The whole pumping train must fulfill high safety and reliability requirements and it has to be made fully tritium compatible. In this paper, the design of a prototype pumping train and the special requirements for a DEMO machine are presented and discussed. A central feature of this pumping train is the use of a liquid metal as tritium compatible working fluid in both pump types, that leads to a pumping train which is able to cover a pressure range of 12 decades, namely from 10{sup −9} to 10{sup 3} mbar. Finally, a test facility for pump testing over a wide pressure regime is described. In this facility (THESEUS), experiments with a diffusion pump have been performed and first results are presented.

  7. Self-mode-locking operation of a diode-end-pumped Tm:YAP laser with watt-level output power

    Science.gov (United States)

    Zhang, Su; Zhang, Xinlu; Huang, Jinjer; Wang, Tianhan; Dai, Junfeng; Dong, Guangzong

    2018-03-01

    We report on a high power continuous wave (CW) self-mode-locked Tm:YAP laser pumped by a 792 nm laser diode. Without any additional mode-locking elements in the cavity, stable and self-starting mode-locking operation has been realized. The threshold pump power of the CW self-mode-locked Tm:YAP laser is only 5.4 W. The maximum average output power is as high as 1.65 W at the pump power of 12 W, with the repetition frequency of 468 MHz and the center wavelength of 1943 nm. To the best of our knowledge, this is the first CW self-mode-locked Tm:YAP laser. The experiment results show that the Tm:YAP crystal is a promising gain medium for realizing the high power self-mode-locking operation at 2 µm.

  8. Clinical utility of routine pre-operative axillary ultrasound and fine needle aspiration cytology in patient selection for sentinel lymph node biopsy.

    Science.gov (United States)

    Rattay, T; Muttalib, M; Khalifa, E; Duncan, A; Parker, S J

    2012-04-01

    In patients with operable breast cancer, pre-operative evaluation of the axilla may be of use in the selection of appropriate axillary surgery. Pre-operative axillary ultrasound (US) and fine needle aspiration cytology (FNAC) assessments have become routine practice in many breast units, although the evidence base is still gathering. This study assessed the clinical utility of US+/-FNAC in patient selection for either axillary node clearance (ANC) or sentinel lymph node biopsy (SLNB) in patients undergoing surgery for operable breast cancer. Over a two-year period, 348 patients with a clinically negative axilla underwent axillary US. 67 patients with suspicious nodes on US also underwent FNAC. The sensitivity and specificity of axillary investigations to determine nodal involvement were 56% (confidence interval: 47-64%) and 90% (84-93%) for US alone, and 76% (61-87%) and 100% (65-100%) for FNAC combined with US, respectively. With a positive US, the post-test probability was 78%. A negative US carried a post-test probability of 25%. When FNAC was positive, the post-test probability was greater than unity. A negative FNAC yielded a post-test probability of 52%. All patients with positive FNAC and most patients with suspicious US were listed for axillary node clearance (ANC) after consideration at the multi-disciplinary team (MDT) meeting. With pre-operative axillary US+/-FNAC, 20% of patients were saved a potential second axillary procedure, facilitating a reduction in the overall re-operation rate to 12%. In this study, a positive pre-operative US+/-FNAC directs patients towards ANC. When the result is negative, other clinico-pathological factors need to be taken into account in the selection of the appropriate axillary procedure. Copyright © 2011 Elsevier Ltd. All rights reserved.

  9. Pre-operative fasting: a nationwide survey of German anaesthesia departments.

    Science.gov (United States)

    Breuer, J-P; Bosse, G; Seifert, S; Prochnow, L; Martin, J; Schleppers, A; Geldner, G; Soreide, E; Spies, C

    2010-03-01

    Shorter pre-operative fasting improves clinical outcome without an increased risk. Since October 2004, German Anaesthesiology Societies have officially recommended a fast of 2 h for clear fluids and 6 h for solid food before elective surgery. We conducted a nationwide survey to evaluate the current clinical practice in Germany. Between July 2006 and January 2007, standardized questionnaires were mailed to 3751 Anaesthesiology Society members in leading positions requesting anonymous response. The overall response rate was 66% (n=2418). Of those, 2148 (92%) claimed familiarity with the new guidelines. About a third (n=806, 34%) reported full adherence to the new recommendations, whereas 1043 (45%) reported an eased fasting practice. Traditional Nil per os after midnight was still recommended by 157 (7%). Commonest reasons reported for adopting the new guidelines were: 'improved pre-operative comfort' (84%), and 'increased patient satisfaction' (83%); reasons against were: 'low flexibility in operation room management' (19%), and 'increased risk of aspiration' (13%). Despite the apparent understanding of the benefits from reduced pre-operative fasting, full implementation of the guidelines remains poor in German anaesthesiology departments.

  10. Analysis of pumping tests of partially penetrating wells in an unconfined aquifer using inverse numerical optimization

    Science.gov (United States)

    Hvilshøj, S.; Jensen, K. H.; Barlebo, H. C.; Madsen, B.

    1999-08-01

    Inverse numerical modeling was applied to analyze pumping tests of partially penetrating wells carried out in three wells established in an unconfined aquifer in Vejen, Denmark, where extensive field investigations had previously been carried out, including tracer tests, mini-slug tests, and other hydraulic tests. Drawdown data from multiple piezometers located at various horizontal and vertical distances from the pumping well were included in the optimization. Horizontal and vertical hydraulic conductivities, specific storage, and specific yield were estimated, assuming that the aquifer was either a homogeneous system with vertical anisotropy or composed of two or three layers of different hydraulic properties. In two out of three cases, a more accurate interpretation was obtained for a multi-layer model defined on the basis of lithostratigraphic information obtained from geological descriptions of sediment samples, gammalogs, and flow-meter tests. Analysis of the pumping tests resulted in values for horizontal hydraulic conductivities that are in good accordance with those obtained from slug tests and mini-slug tests. Besides the horizontal hydraulic conductivity, it is possible to determine the vertical hydraulic conductivity, specific yield, and specific storage based on a pumping test of a partially penetrating well. The study demonstrates that pumping tests of partially penetrating wells can be analyzed using inverse numerical models. The model used in the study was a finite-element flow model combined with a non-linear regression model. Such a model can accommodate more geological information and complex boundary conditions, and the parameter-estimation procedure can be formalized to obtain optimum estimates of hydraulic parameters and their standard deviations.

  11. Test of the scroll pump in the JAERI Fuel Cleanup System in the Tritium Systems Test Assembly. JFCU scroll pump test and result, JFCU stand alone tritium test 2

    Energy Technology Data Exchange (ETDEWEB)

    Hayashi, Takumi; Konishi, Satoshi [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment; Ohira, Shigeru [and others

    1993-03-01

    In the JAERI Fuel Cleanup System (JFCU), major subsystem of the TSTA simulated fusion fuel loop, a Normetex Scroll pump is used to pump out hydrogen isotope gases from the palladium diffuser. The characteristics of the pump was measured with hydrogen isotopes and helium, in a closed loop. Compression ratio and ultimate pressure were strongly affected by the delivery pressure and the species of the gas. Particularly with H{sub 2} and D{sub 2}, additional metal bellows pump was proved to be needed to satisfy the process requirement. For hydrogen isotopes, pumping characteristics improves with the mass of the gas and similar pumping capability was obtained with pure T{sub 2} and helium. (author).

  12. Clinical feasibility of pre-operative neurodevelopmental assessment of infants undergoing open heart surgery.

    Science.gov (United States)

    Campbell, Miranda; Rabbidge, Bridgette; Ziviani, Jenny; Sakzewski, Leanne

    2017-08-01

    Assessing the neurodevelopmental status of infants with congenital heart disease before surgery provides a means of identifying those at heightened risk of developmental delay. This study aimed to investigate factors impacting clinical feasibility of pre-operative neurodevelopmental assessment of infants undergoing early open heart surgery. Infants who underwent open heart surgery prior to 4 months of age participated in this cross-sectional study. The Test of Infant Motor Performance and Prechtl's Assessment of General Movements were undertaken on infants pre-operatively. When assessments could not be undertaken, reasons were ascribed to either infant or environmental circumstances. Demographic data and Aristotle scores were compared between groups of infants who did or did not undergo assessment. Binary logistic regression was used to explore associations. A total of 60 infants participated in the study. Median gestational age was 38.78 weeks (interquartile range: 36.93-39.72). Of these infants, 37 (62%) were unable to undergo pre-operative assessment. Twenty-four (40%) could not complete assessment due to infant-related factors and 13 (22%) due to environmental-related factors. For every point increase in the Aristotle Patient-Adjusted Complexity score, the infants likelihood of being unable to undergo assessment increased by 35% (odds ratio: 0.35; 95% confidence interval: 1.03-1.77, P = 0.03). Over half of the infants undergoing open heart surgery were unable to complete pre-operative neurodevelopmental assessment. The primary reason for this was infant-related medical instability. Findings suggest further research is warranted to investigate whether the Aristotle Patient-Adjusted Complexity score might serve as an indicator to inform developmental surveillance with this medically fragile cohort. © 2017 Paediatrics and Child Health Division (The Royal Australasian College of Physicians).

  13. Main boiler feed pump for fast breeder test reactor. Failure analysis and remedial measures

    International Nuclear Information System (INIS)

    Iyer, M.A.K.; Chande, S.K.; Raghuvir, A.D.; Baskar, S.; Kale, R.D.

    1994-01-01

    A small capacity ten stage 670 kw feed water pump is used for supplying feed water at a temperature of 190 deg C to a once through steam generator in the Fast Breeder Test Reactor at Kalpakkam. During preparatory heating up stage to commission the steam generator the pump suffered a severe loss of suction which resulted in failure of hydrostatic journal bearings and extensive damage to pump internals. This paper discusses the detailed mechanism of loss of suction, details of damage to the pump and various modifications carried out to prevent recurrence of the problem. (author). 4 refs., 3 figs., 2 tabs

  14. Automated surveillance of reactor coolant pump performance

    International Nuclear Information System (INIS)

    Gross, K.C.; Singer, R.M.; Humenik, K.E.

    1992-01-01

    An artificial intelligence based expert system has been developed for continuous surveillance and diagnosis of centrifugal-type reactor coolant pump (RCP) performance and operability. The expert system continuously monitors digitized signals from a variety of physical variables (speed, vibration level, motor power, discharge pressure) associated with RCP performance for annunciation of the incipience or onset of off-normal operation. The system employs an extremely sensitive pattern-recognition technique, the sequential probability ratio test (SPRT) for rapid identification of pump operability degradation. The sequential statistical analysis of the signal noise has been shown to provide the theoretically shortest sampling time to detect disturbances and thus has the potential of providing incipient fault detection information to operators sufficiently early to avoid forced plant shutdowns. The sensitivity and response time of the expert system are analyzed in this paper using monte carlo simulation techniques

  15. Off-pump versus On-pump Coronary Artery Bypass Grafting in Frail Patients: Study Protocol for the FRAGILE Multicenter Randomized Controlled Trial

    Directory of Open Access Journals (Sweden)

    Omar Asdrúbal Vilca Mejía

    Full Text Available Abstract Introduction: Advances in modern medicine have led to people living longer and healthier lives. Frailty is an emerging concept in medicine yet to be explored as a risk factor in cardiac surgery. When it comes to CABG surgery, randomized controlled clinical trials have primarily focused on low-risk (ROOBY, CORONARY, elevated-risk (GOPCABE or high-risk patients (BBS, but not on frail patients. Therefore, we believe that off-pump CABG could be an important technique in patients with limited functional capacity to respond to surgical stress. In this study, the authors introduce the new national, multicenter, randomized, controlled trial "FRAGILE", to be developed in the main cardiac surgery centers of Brazil, to clarify the potential benefit of off-pump CABG in frail patients. Methods: FRAGILE is a two-arm, parallel-group, multicentre, individually randomized (1:1 controlled trial which will enroll 630 patients with blinded outcome assessment (at 30 days, 6 months, 1 year, 2 years and 3 years, which aims to compare adverse cardiac and cerebrovascular events after off-pump versus on-pump CABG in pre-frail and frail patients. Primary outcomes will be all-cause mortality, acute myocardial infarction, cardiac arrest with successful resuscitation, low cardiac output syndrome/cardiogenic shock, stroke, and coronary reintervention. Secondary outcomes will be major adverse cardiac and cerebrovascular events, operative time, mechanical ventilation time, hyperdynamic shock, new onset of atrial fibrillation, renal replacement therapy, reoperation for bleeding, pneumonia, length of stay in intensive care unit, length of stay in hospital, number of units of blood transfused, graft patency, rate of complete revascularization, neurobehavioral outcomes after cardiac surgery, quality of life after cardiac surgery and costs. Discussion: FRAGILE trial will determine whether off-pump CABG is superior to conventional on-pump CABG in the surgical treatment of

  16. Empirical Platform Data Analysis to Investigate how Heat Pumps Operate in Real-Life Conditions

    DEFF Research Database (Denmark)

    Carmo, Carolina; Elmegaard, Brian; Nielsen, M. P.

    2015-01-01

    Heat pumps have been widely acknowledged, by academia and industry, as highly efficient thermal energy technologies, for space heating and domestic hot water production. However, there is a lack of information about real performance in residential single family houses with active participation...... of end-users. In this paper, an analysis based on data from 242 heat pump installations in Denmark gathered over a period up to 4 years (2010 until today) is performed. COP, operating temperatures and socio-demographic data are used as basis for comparing theoretical and actual performance. Six different...... heat pump configurations are considered depending on source (ground or air) and sink (radiators, floor heating and/or combined systems). This unique study intends to point out the benefits and limitations of such technologies in terms of energy efficiency and comfort delivery, as well as investigating...

  17. Two-wavelength, passive self-injection-controlled operation of diode-pumped cw Yb-doped crystal lasers.

    Science.gov (United States)

    Louyer, Yann; Wallerand, Jean-Pierre; Himbert, Marc; Deneva, Margarita; Nenchev, Marin

    2003-09-20

    We demonstrate and investigate a peculiar mode of cw Yb3+-doped crystal laser operation when two emissions, at two independently tunable wavelengths, are simultaneously produced. Both emissions are generated from a single pumped volume and take place in either a single beam or spatially separated beams. The laser employs original two-channel cavities that use a passive self-injection-locking (PSIL) control to reduce intracavity loss. The advantages of the application of the PSIL technique and some limitations are shown. The conditions for two-wavelength multimode operation of the cw quasi-three-level diode-pumped Yb3+ lasers and the peculiarity of such an operation are carried out both theoretically and experimentally. The results reported are based on the example of a Yb3+:GGG laser but similar results are also obtained with a Yb3+:YAG laser. The laser operates in the 1023-1033-nm (1030-1040-nm) range with a total output power of 0.4 W. A two-wavelength, single longitudinal mode generation is also obtained.

  18. The effect of pre-operative optimization on post-operative outcome in Crohn's disease resections

    DEFF Research Database (Denmark)

    El-Hussuna, Alaa; Iesalnieks, Igors; Horesh, Nir

    2017-01-01

    BACKGROUND: The timing of surgical intervention in Crohn's disease (CD) may depend on pre-operative optimization (PO) which includes different interventions to decrease the risk for unfavourable post-operative outcome. The objective of this study was to investigate the effect of multi-model PO on...

  19. Reactor coolant pump monitoring and diagnostic system

    International Nuclear Information System (INIS)

    Singer, R.M.; Gross, K.C.; Walsh, M.; Humenik, K.E.

    1990-01-01

    In order to reliably and safely operate a nuclear power plant, it is necessary to continuously monitor the performance of numerous subsystems to confirm that the plant state is within its prescribed limits. An important function of a properly designed monitoring system is the detection of incipient faults in all subsystems (with the avoidance of false alarms) coupled with an information system that provides the operators with fault diagnosis, prognosis of fault progression and recommended (either automatic or prescriptive) corrective action. In this paper, such a system is described that has been applied to reactor coolant pumps. This system includes a sensitive pattern-recognition technique based upon the sequential probability ratio test (SPRT) that detects incipient faults from validated signals, an expert system embodying knowledge bases on pump and sensor performance, extensive hypertext files containing operating and emergency procedures as well as pump and sensor information and a graphical interface providing the operator with easily perceived information on the location and character of the fault as well as recommended corrective action. This system is in the prototype stage and is currently being validated utilizing data from a liquid-metal cooled fast reactor (EBR-II). 3 refs., 4 figs

  20. Enhanced technical and economic working domains of industrial heat pumps operated in series

    DEFF Research Database (Denmark)

    Ommen, Torben; Jensen, Jonas Kjær; Markussen, Wiebke Brix

    2015-01-01

    By operating heat pumps (HPs) in series, it is possible to obtain closer match between working fluid and sink- and source streams, resulting in higher coefficient of performance (COP). For industrial HPs, it was found that serial connection of either two or three units results in an increase in COP...

  1. Innovative application of air ejector as a pump for continuous air monitors

    International Nuclear Information System (INIS)

    Dhanasekaran, A.; Ajoy, K.C.; Santhanam, R.; Rajagopal, V.; Jose, M.T.

    2016-01-01

    Workplace monitoring, one of the key components of the radiation protection program is generally carried out by means of instruments installed permanently in respective areas or through portable air sampling instruments. Continuous air monitor (CAM) is one such monitor that constantly monitors the radionuclide concentration in air and triggers alarm as and when the air concentration goes above the pre-set levels. Conventional CAM system has a filter head, detector, display unit and a pump as four major parts. Pump may be either rotary vane or a vibrating diaphragm which are electrically driven using motors. Air lift pumps using ejectors are widely used where pump reliability and low maintenance are required, and where corrosive, abrasive, or radioactive fluids are handled. Since ejectors are uncomplicated alternative to vacuum pumps, an attempt was made to use the same as a pump for conventional CAMs. An ejector based sampling set up was made, tested and the results are represented in this paper

  2. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop test of the sludge mobilization cart system to be used in the AZ-101 Mixer Pump Demonstration Test Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  3. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  4. Pressure variation characteristics at trapping region in oil hydraulic piston pumps

    International Nuclear Information System (INIS)

    Kim, Jong Ki; Jung, Jae Youn; Rho, Byung Joon; Song, Kyu Keun; Oh, Seok Hyung

    2003-01-01

    Pressure variation is one of the major sources on noise emission in the oil hydraulic piston pumps. Therefore, it is necessary to clarify about pressure variation characteristics of the oil hydraulic piston pumps to reduce noise. Pressure variations in a cylinder at trapping region were measured during pump working period with discharge pressures, rotational speeds. The effect of pre-compression of the discharge port with three types valve plates also investigated. It was found that the pressure variation characteristics of oil hydraulic piston pumps deeply related with pre-compression design of the discharge port. Also, it was found that the pressure overshoot at trapping region can reduce by use of pre-compression at the end of the discharge port in valve plate

  5. Pre-test evaluation of LLTR series II Test A-7

    International Nuclear Information System (INIS)

    Knittle, D.

    1981-03-01

    The purpose of this report is to present pre-test predictions of pressure histories for the A-7 test to be conducted in the Large Leak Test Rig (LLTR) at the Energy Technology Engineering Center (ETEC) in April 1981

  6. Performance evaluation of an integrated automotive air conditioning and heat pump system

    International Nuclear Information System (INIS)

    Hosoz, M.; Direk, M.

    2006-01-01

    This study deals with the performance characteristics of an R134a automotive air conditioning system capable of operating as an air-to-air heat pump using ambient air as a heat source. For this aim, an experimental analysis has been performed on a plant made up of original components from an automobile air conditioning system and some extra equipment employed to operate the system in the reverse direction. The system has been tested in the air conditioning and heat pump modes by varying the compressor speed and air temperatures at the inlets of the indoor and outdoor coils. Evaluation of the data gathered in steady state test runs has shown the effects of the operating conditions on the capacity, coefficient of performance, compressor discharge temperature and the rate of exergy destroyed by each component of the system for both operation modes. It has been observed that the heat pump operation provides adequate heating only in mild weather conditions, and the heating capacity drops sharply with decreasing outdoor temperature. However, compared with the air conditioning operation, the heat pump operation usually yields a higher coefficient of performance and a lower rate of exergy destruction per unit capacity. It is also possible to improve the heating mode performance of the system by redesigning the indoor coil, using another refrigerant with a higher heat rejection rate in the condenser and employing a better heat source such as the engine coolant or exhaust gases

  7. Operation of a high-gradient superconducting radio-frequency cavity with a non-evaporable getter pump

    International Nuclear Information System (INIS)

    Ciovati, G.; Geng, R.; Lushtak, Y.; Manini, P.; Maccallini, E.; Stutzman, M.

    2017-01-01

    The use of non-evaporable getter (NEG) pumps in particle accelerators has increased significantly over the past few years because of their large pumping speed, particularly for hydrogen, compared to the size of the pump. A concern about using such pumps in superconducting radio-frequency (SRF) accelerators is the possibility of shedding particulates which could then migrate into the SRF cavities and produce field emission, therefore degrading the cavity performance. One option to mitigate such issue is to use sintered getter materials which intrinsically offer superior mechanical and particle retention properties. In this article we present the results from cryogenic RF tests of a high-gradient SRF cavity after being evacuated several times with an NEG pump equipped with sintered getter disks and placed in close proximity to the cavity. The results showed that the cavity performance was not affected by the pump up to the quench gradient of 34 MV/m. As a result of this study, two such NEG pumps have been installed next to a cryomodule in the CEBAF accelerator to maintain ultra-high vacuum in the SRF cryomodule and two adjacent warm girder sections.

  8. Operation of a high-gradient superconducting radio-frequency cavity with a non-evaporable getter pump

    Energy Technology Data Exchange (ETDEWEB)

    Ciovati, G., E-mail: gciovati@jlab.org [Thomas Jefferson National Accelerator Facility, Newport News, VA 23606 (United States); Geng, R. [Thomas Jefferson National Accelerator Facility, Newport News, VA 23606 (United States); Lushtak, Y.; Manini, P.; Maccallini, E. [SAES Getters, S.p.A, Viale Italia, 77, 20020 Lainate, MI (Italy); Stutzman, M. [Thomas Jefferson National Accelerator Facility, Newport News, VA 23606 (United States)

    2017-01-11

    The use of non-evaporable getter (NEG) pumps in particle accelerators has increased significantly over the past few years because of their large pumping speed, particularly for hydrogen, compared to the size of the pump. A concern about using such pumps in superconducting radio-frequency (SRF) accelerators is the possibility of shedding particulates which could then migrate into the SRF cavities and produce field emission, therefore degrading the cavity performance. One option to mitigate such issue is to use sintered getter materials which intrinsically offer superior mechanical and particle retention properties. In this article we present the results from cryogenic RF tests of a high-gradient SRF cavity after being evacuated several times with an NEG pump equipped with sintered getter disks and placed in close proximity to the cavity. The results showed that the cavity performance was not affected by the pump up to the quench gradient of 34 MV/m. As a result of this study, two such NEG pumps have been installed next to a cryomodule in the CEBAF accelerator to maintain ultra-high vacuum in the SRF cryomodule and two adjacent warm girder sections.

  9. The development of a cavitation free sodium pump for the breeder reactor

    International Nuclear Information System (INIS)

    Baladi, J.Y.; Nyilas, C.P.

    1986-12-01

    The sodium pumps for a liquid metal fast breeder reactor must be designed for exceptionally high reliability and long life. The principal adverse factor which tends to limit the primary pump life is cavitation which becomes potentially severe under off-design flow conditions caused by the requirement of two loop operations which resulted in a large operating flow range. This problem prompted an extensive study which included experimental investigations of scaled down and full size pumps. The investigations involved visual observations, acoustic signature recordings, and physical characteristic measurements of the model and full size impellers. The blade configuration of the model was modified several times. After each modification intensive testing was conducted with feedback to established design criteria. The results obtained from the final configuration showed excellent cavitation performance. This configuration was then machined on the full scale impeller and tested. The results confirmed acceptable performance in the entire range of operating conditions. This paper describes the test facilities erected for this study, discusses the experimental techniques employed, and presents the experimental techniques employed, and presents a sample of the experimental results

  10. 10 CFR 26.65 - Pre-access drug and alcohol testing.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Pre-access drug and alcohol testing. 26.65 Section 26.65... § 26.65 Pre-access drug and alcohol testing. (a) Purpose. This section contains pre-access testing... days. If an individual has negative results from drug and alcohol tests that were conducted under the...

  11. Photovoltaic pump systems

    Science.gov (United States)

    Klockgether, J.; Kiessling, K. P.

    1983-09-01

    Solar pump systems for the irrigation of fields and for water supply in regions with much sunshine are discussed. For surface water and sources with a hoisting depth of 12 m, a system with immersion pumps is used. For deep sources with larger hoisting depths, an underwater motor pump was developed. Both types of pump system meet the requirements of simple installation and manipulation, safe operation, maintenance free, and high efficiency reducing the number of solar cells needed.

  12. Condition monitoring of main coolant pumps, Dhruva

    International Nuclear Information System (INIS)

    Prasad, V.; Satheesh, C.; Acharya, V.N.; Tikku, A.C.; Mishra, S.K.

    2002-01-01

    Full text: Dhruva is a 100 MW research reactor with natural uranium fuel, heavy water as moderator and primary coolant. Three Centrifugal pumps circulate the primary coolant across the core and the heat exchangers. Each pump is coupled to a flywheel (FW) assembly in order to meet operational safety requirements. All the 3 main coolant pump (MCP) sets are required to operate during operation of the reactor. The pump-sets are in operation since the year 1984 and have logged more than 1,00,000 hrs. Frequent breakdowns of its FW bearings were experienced during initial years of operation. Condition monitoring of these pumps, largely on vibration based parameters, was initiated on regular basis. Break-downs of main coolant pumps reduced considerably due to the fair accurate predictions of incipient break-downs and timely maintenance efforts. An effort is made in this paper to share the experience

  13. Numerical simulation of hydrodynamics in a pump-turbine at off-design operating conditions in turbine mode

    International Nuclear Information System (INIS)

    Yan, J P; Seidel, U; Koutnik, J

    2012-01-01

    The hydrodynamics of a reduced-scaled model of a radial pump-turbine is investigated under off-design operating conditions, involving runaway and 'S-shape' turbine brake curve at low positive discharge. It is a low specific speed pump-turbine machine of Francis type with 9 impeller blades and 20 stay vanes as well as 20 guide vanes. The computational domain includes the entire water passage from the spiral casing inlet to the draft tube outlet. Completely structured hexahedral meshes generated by the commercial software ANSYS-ICEM are employed. The unsteady incompressible simulations are performed using the commercial code ANSYS-CFX13. For turbulence modeling the standard k-ε model is applied. The numerical results at different operating points are compared to the experimental results. The predicted pressure amplitude is in good agreement with the experimental data and the amplitude of normal force on impeller is in reasonable range. The detailed analysis reveals the onset of the flow instabilities when the machine is brought from a regular operating condition to runaway and turbine break mode. Furthermore, the rotating stall phenomena are well captured at runaway condition as well as low discharge operating condition with one stall cell rotating inside and around the impeller with about 70% of its frequency. Moreover, the rotating stall is found to be the effect of rotating flow separations developed in several consecutive impeller channels which lead to their blockage. The reliable simulation of S-curve characteristics in pump-turbines is a basic requirement for design and optimization at off-design operating conditions.

  14. Performance analysis of air source heat pump system for office building

    Energy Technology Data Exchange (ETDEWEB)

    Han, Dong Won; KIm, Yong Chan [Korea University, Seoul (Korea, Republic of); Chang, Young Soo [School of Mechanical System Engineering, Kookmin University, Seoul (Korea, Republic of)

    2016-11-15

    In this study, the performance of an air source heat pump system installed in a commercial building is analyzed using the developed heat pump performance model and building load simulation data of several regions in Korea. The performance test of an air source heat pump system with a variable speed compressor is tested to develop model that considers changes in the performance characteristics of the heat pump system under various operating conditions. The heat pump system is installed in an environmental chamber, and the experimental equipment is set up according to the manufacturer' specifications as well as the AHRI 1230 test specifications. The performance test conditions of the heat pump system are selected using a central composite design method, in which 29 points for each cooling and heating mode are selected. The developed performance model based on experimental data predicts experimental values with an error of ±5 %. Building cooling and heating loads in three regions in Korea are analyzed using TRNSYS software, which includes standard building and weather data from Seoul, Daejeon and Busan in Korea. The effects of outdoor air temperature and part load ratio on the performance and regional monthly average power consumption of the heat pump system are analyzed.

  15. Retrofit of AECL CAN6 seals into the Pickering shutdown cooling pumps

    International Nuclear Information System (INIS)

    Rhodes, D.; Metcalfe, R.; Brown, G.

    1997-01-01

    The existing mechanical seals in the shutdown cooling (SDC) pumps at the eight-unit Pickering Nuclear Generating Station have caused as least seven forced outages in the last fifteen years. The SDC pumps were originally intended to run only during shutdowns, mostly at low pressure, except for short periods during routine testing of SDC isolation valves while the plant is operating at full pressure to verify that the emergency core injection system is available. Unfortunately, in practice, some SDC pumps must be run much more frequently than this to prevent overheating or freezing of components in the system while the plant is at power. This more severe service has decreased seal lifetime from about 8000 running hours to about 3000 running hours. Rather than tackling the difficult task of eliminating on-power running of the pumps, Pickering decided to install a more robust seal design that could withstand this. Through the process of competitive tender, AECL's CAN6 seal was chosen. This seal has a successful history in similarly demanding conditions in boiling water reactors in the USA. To supplement this and demonstrate there would be no 'surprises,' a 2000-hour test program was conducted. Testing consisted of simulating all the expected conditions, plus some special tests under abnormal conditions. This has given assurance that the seal will operate reliably in the Pickering shutdown cooling pumps. (author)

  16. Retrofit of AECL CAN6 seals into the Pickering shutdown cooling pumps

    International Nuclear Information System (INIS)

    Rhodes, D.; Metcalfe, R.; Brown, G.; Kiameh, P.; Burchett, P.

    1997-01-01

    The existing mechanical seals in the shutdown cooling (SDC) pumps at the eight-unit Pickering Nuclear Generating Station have caused at least seven forced outages in the last fifteen years. The SDC pumps were originally intended to run only during shutdowns, mostly at low pressure, except for short periods during routine testing of SDC isolation valves while the plant is operating at full pressure to verify that the emergency core injection system is available. Unfortunately, in practice, some SDC pumps must be run much more frequently than this to prevent overheating or freezing of components in the system while the plant is at power. This more severe service has decreased seal lifetime from about 8000 running hours to about 3000 running hours. Rather than tackling the difficult task of eliminating on-power running of the pumps, Pickering decided to install a more robust seal design that could withstand this. Through the process of competitive tender, AECL's CAN6 seal was chosen. This seal has a successful history in similarly demanding conditions in boiling water reactors in the USA. To supplement this and demonstrate there would be no 'surprises,' a 2000-hour test program was conducted. Testing consisted of simulating all the expected conditions, plus some special tests under abnormal conditions. This has given assurance that the seal will operate reliably in the Pickering shutdown cooling pumps. (author)

  17. LOFT pump speed controller stability and accuracy analysis

    International Nuclear Information System (INIS)

    Good, R.R.

    1978-01-01

    Two system modifications to the primary coolant pumps motor generators control systems have recently been completed. The range of pump speed operation has been extended and the scoop tube positioner motor replaced. This has necessitated a re-analysis of PSMG stability throughout its range of operation. System accuracy requirements of less than 4 Hz differential pump speed when operating at less than 35 Hz and 8.5 Hz differential pump speed when operating at greater than 35 Hz can be guaranteed by specifying the gain of the system. The installation of the new scoop tube positioner motor will increase the PSMG system's bandwidth and stability. Low speed pump trips should be carefully evaluated if the pump's operational range is to extend to 10 Hz

  18. LOBI test BT-15/BT-16 pre-test calculation

    International Nuclear Information System (INIS)

    Holmes, B.J.

    1991-03-01

    LOBI is a higher pressure, electrically heated integral system facility simulating a KWU 1300 MW PWR scaled 1:712 by volume, although full scale has been maintained in the vertical direction. In order to complete the test programme before the facility is closed in 1991 a number of tests have been performed in tandem, where the test procedures were compatible. BT-15/BT-16 is one such composite test. In their original form both tests BT-15 and BT-16 simulated a loss of main feedwater transient with delayed auxiliary feedwater injection, with the pumps running in BT-15 and tripped in BT-16. The aim of each test was to investigate the loss of primary/secondary heat transfer as the steam generator secondary sides boiled down, and the subsequent recovery of heat transfer as the auxiliary feedwater was tripped on. Due to a re-scheduling of the test programme there was insufficient time to perform sensitivity studies and so only one, base case, calculation is presented. (author)

  19. Diode-pumped continuous-wave blue laser operation of Nd:GGG at 467.0, 467.7, and 468.5 nm

    International Nuclear Information System (INIS)

    Xu, B; Camy, P; Doualan, J L; Braud, A; Moncorgé, R; Cai, Z P; Brenier, A

    2012-01-01

    Intra-cavity frequency doubling of continuous-wave (CW) laser emission on the quasi-three level ( 4 F 3/2 → 4 I 9/2 ) laser transition of Nd 3+ in Nd:GGG is reported by using a three-mirror folded resonator. The thermal lens experienced by the optically-pumped Nd:GGG laser crystal is measured as a function of the absorbed pump power and compared to that found, in the same conditions, in the case of Nd:YAG. Results are interpreted by using a simple model accounting for the absorbed pump power and the thermo-mechanical properties of each laser crystal. Diode-pumped blue laser operation is achieved, for the first time, at 467.0 and 468.5 nm with output powers of 230 and 450 mW, respectively. Simultaneous laser operation resulting both from frequency-doubling and frequency summing at the three 467.1, 467.7, and 468.1 nm laser wavelengths is also obtained with a total output power of 60 mW

  20. A retrospective analysis of surgical site infections after chlorhexidine-alcohol versus iodine-alcohol for pre-operative antisepsis.

    Science.gov (United States)

    Charehbili, Ayoub; Swijnenburg, Rutger-Jan; van de Velde, Cornelis; van den Bremer, Jephta; van Gijn, Willem

    2014-06-01

    Surgical site infection (SSI) is the most common hospital-acquired infection in the Netherlands. There is little evidence in regard to differences in the efficacy of pre-operative topical antisepsis with iodine-alcohol as compared with chlorhexidine-alcohol for preventing SSI. We conducted a retrospective analysis at a single center, involving all patients who underwent breast, colon, or vascular surgery in 2010 and 2011, in which pre-operative disinfection of the skin was done with iodine-alcohol in 2010 and with chlorhexidine-alcohol in 2011. Demographic characteristics, surgical parameters, and rates of SSI were compared in the two groups of patients. Subgroup analyses were done for wound classification, wound type, and type of surgery performed. Associations of patient characteristics with SSI were also investigated. Data were analyzed with χ(2) tests, Student t-tests, and logistic regression analysis. No statistically significant difference was found in the rates of SSI in the two study groups, at 6.1% for the patients who underwent antisepsis with iodine-alcohol and 3.8% for those who underwent disinfection with chlorhexidine-alcohol (p=0.20). After multivariable analysis, an odds ratio (OR) of 0.68 (95% confidence interval [CI] 0.30-1.47) in favor of chlorhexidine-alcohol was found. Male gender, acute surgery, absence of antibiotic prophylaxis, and longer hospital length of stay (LOS) were all associated with SSI after pre-operative topical antisepsis. In this single-center study conducted over a course of one year with each of the preparations investigated, no difference in the rate of SSI was found after an instantaneous protocol change from iodine-alcohol to chlorhexidine-alcohol for pre-operative topical antisepsis.

  1. Improved reliability of residential heat pumps; Foerbaettrad driftsaekerhet hos villavaermepumpar

    Energy Technology Data Exchange (ETDEWEB)

    Haglund Stignor, Caroline; Larsson, Kristin; Jensen, Sara; Larsson, Johan; Berg, Johan; Lidbom, Peter; Rolfsman, Lennart

    2012-07-01

    Today, heat pump heating systems are common in Swedish single-family houses. Many owners are pleased with their installation, but statistics show that a certain number of heat pumps break every year, resulting in high costs for both insurance companies and owners. On behalf of Laensfoersaekringars Forskningsfond, SP Energy Technology has studied the cause of the most common failures for residential heat pumps. The objective of the study was to suggest what measures to be taken to reduce the number of failures, i.e. improving the reliability of heat pumps. The methods used were analysis of public failure statistics and sales statistics and interviews with heat pump manufacturers, installers, service representatives and assessors at Laensfoersaekringar. In addition, heat pump manuals have been examined and literature searches for various methods for durability tests have been performed. Based on the outcome from the interviews the most common failures were categorized by if they; 1. Could have been prevented by better operation and maintenance of the heat pump. 2. Caused by a poorly performed installation. 3. Could have been prevented if certain parameters had been measured, recorded and followed up. 4. Are due to poor quality of components or systems. However, the results show that many of the common failures fall into several different categories and therefore, different types of measures must be taken to improve the operational reliability of residential heat pumps. The interviews tell that failures often are caused by poor installation, neglected maintenance and surveillance, and poor quality of standard components or that components are used outside their declared operating range. The quality of the installations could be improved by increasing installers' knowledge about heat pumps and by requiring that an installation protocol shall be filled-in. It is also important that the owner of the heat pump performs the preventive maintenance recommended by the

  2. Improved reliability of residential heat pumps; Foerbaettrad driftsaekerhet hos villavaermepumpar

    Energy Technology Data Exchange (ETDEWEB)

    Haglund Stignor, Caroline; Larsson, Kristin; Jensen, Sara; Larsson, Johan; Berg, Johan; Lidbom, Peter; Rolfsman, Lennart

    2012-07-01

    Today, heat pump heating systems are common in Swedish single-family houses. Many owners are pleased with their installation, but statistics show that a certain number of heat pumps break every year, resulting in high costs for both insurance companies and owners. On behalf of Laensfoersaekringars Forskningsfond, SP Energy Technology has studied the cause of the most common failures for residential heat pumps. The objective of the study was to suggest what measures to be taken to reduce the number of failures, i.e. improving the reliability of heat pumps. The methods used were analysis of public failure statistics and sales statistics and interviews with heat pump manufacturers, installers, service representatives and assessors at Laensfoersaekringar. In addition, heat pump manuals have been examined and literature searches for various methods for durability tests have been performed. Based on the outcome from the interviews the most common failures were categorized by if they; 1. Could have been prevented by better operation and maintenance of the heat pump. 2. Caused by a poorly performed installation. 3. Could have been prevented if certain parameters had been measured, recorded and followed up. 4. Are due to poor quality of components or systems. However, the results show that many of the common failures fall into several different categories and therefore, different types of measures must be taken to improve the operational reliability of residential heat pumps. The interviews tell that failures often are caused by poor installation, neglected maintenance and surveillance, and poor quality of standard components or that components are used outside their declared operating range. The quality of the installations could be improved by increasing installers' knowledge about heat pumps and by requiring that an installation protocol shall be filled-in. It is also important that the owner of the heat pump performs the preventive maintenance recommended by the

  3. How efficient are heat pumps? Investigations in practical operation; Wie effizient sind Waermepumpen? Messungen im Praxisbetrieb

    Energy Technology Data Exchange (ETDEWEB)

    Miara, Marek [Fraunhofer ISE, Freiburg (Germany)

    2010-11-15

    Heat pump systems win ever larger market shares within the range of the heating and hot water preparation in buildings. But, how great is their efficiency in the practical operation? What are the factors which affect the efficiency? In order to evaluate the ecological, energetic and economic criteria better, Fraunhofer ISE (Freiburg, Federal Republic of Germany) has investigated nearly two hundred heat pump systems scientifically. The contribution under consideration summarizes the most current results and the most important realizations.

  4. Development and testing of mini heat pump for low-energy houses. Final report; Udvikling og test af minivarmepumpe til lavenergihuse. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, Per Henrik; Madsen, Claus; Frederiksen, Klaus; Andreasen, Marcin Blazniak (Teknologisk Institut, Koele- og Varmepumpeteknik, Taastrup (Denmark))

    2010-11-15

    New residential houses are better insulated, and this reduces the need for heat during the winter period. In addition to this many new houses have floor heating systems. This combination is favourable for small heat pumps which can produce heat to central water systems with low water temperatures in the area 25 to 35 C. 4 prototypes of mini heat pumps of the brine/water type was build and tested in the refrigeration laboratory at the Danish Technological Institute (DTI). The prototypes are using a variable speed compressor (Danfoss SLV12) which originally is developed for plug-in supermarket cabinets. The heating capacity of the prototypes can vary between 1.0 and 2.1 kW. The refrigerant charge is 150 grams of R290 (propane). Two prototypes are charged with 375 grams of R134a. Tests were conducted following EN14511 at 0/+35 C and COP was measured to between 3.2 and 3.6 depending of the compressor speed and the type of plate heat exchangers used. This is quite good for such small machines. One of the prototypes was installed in the Energy Flex House which is a new highly insulated test house build at the DTI. The house was equipped with two heat pumps: 1. An exhaust air heat pump taking energy from exhaust air and producing hot tap water and heating the intake air; 2. A mini heat pump for floor heating taking energy from ground source outside the house. A family with four persons lives in the house. During the cold winter 2009/2010 the mini heat pump showed good performance and the COP varies between 2.0 and 4.0. The lower value was caused by a fault in the floor heating hoses, which made it necessary to increase the temperature of the central heating water, which decreased the efficiency of the heat pump during the coldest winter period. The floor heating system has been repaired, and a new prototype heat pump with a slightly bigger compressor has been installed for the heating season 2010/2011. A heat pump manufacturer is now producing this combination of exhaust

  5. Operation characteristic of a heat pump of mechanical vapor recompression propelled by fans and its performance analysis applied to waste-water treatment

    Science.gov (United States)

    Weike, Pang; Wenju, Lin; Qilin, Pan; Wenye, Lin; Qunte, Dai; Luwei, Yang; Zhentao, Zhang

    2014-01-01

    In this paper, a set of heat pump (called as Mechanical Vapor Recompression, MVR) propelled by a centrifugal fan is tested and it shows some special characteristic when it works together with a falling film evaporator. Firstly, an analysis of the fan's suction and discharge parameters at stable state, such as its pressure and temperature, indicates that a phenomenon of wet compression is probably to appear during vapor compression. As a result, superheat after saturated vapor is compressed is eliminated, which reduces discharge temperature of the system. It is because drops boil away and absorb the super heat into their latent heat during vapor compression. Meanwhile, drops in the suction vapor add to the compressed vapor, which increase the given heat of the MVR heat pump. Next, assistant electric heat could adjust and keep steady of the operating pressure and temperature of an MVR heat pump. With the evaporation temperature up to be high, heat balance is broken and supplement heat needs to increase. Thirdly, the performance of an MVR heat pump is affect by the balance of falling film and evaporation that has an effect on heat transfer. Then, two parameters standing for the performance are measured as it runs in practical condition. The two important parameters are consumptive electricity power and productive water capacity. According to theoretical work in ideal condition by calculation and fan's input power by measure as running, adiabatic efficiency (ηad) of a centrifugal fan is calculated when it is applied in a heat pump of MVR. Following, based on ηad, practical SMER and COP of an MVR heat pump are discovered to be correlative with it. Finally, in dependence on productive water in theory and in practice, displacement efficiency (ηv) of centrifugal fans is obtained when compressing vapor, and so provide some references of matching a fan for an MVR heat pump. On the other hand, it is helpful to research and develop MVR heat pumps, and also to check

  6. Cooling and heating performances of a CO2 heat pump with the variations of operating conditions

    International Nuclear Information System (INIS)

    Baek, Chang Hyun; Lee, Eung Chan; Kang, Hun; Kim, Yong Chan; Cho, Hong Hyun

    2008-01-01

    Since operating conditions are significantly different for heating and cooling mode operations in a CO 2 heat pump system, it is difficult to optimize the performance of the CO 2 cycle. In addition, the performance of a CO 2 heat pump is very sensitive to outdoor temperature and gascooler pressure. In this study, the cooling and heating performances of a variable speed CO 2 heat pump with a twin-rotary compressor were measured and analyzed with the variations of EEV opening and compressor frequency. As a result, the cooling and heating COPs were 2.3 and 3.0, respectively, when the EEV opening was 22%. When the optimal EEV openings for heating and cooling were 28% and 16%, the cooling and heating COPs increased by 3.3% and 3.9%, respectively, over the COPs at the EEV opening of 22%. Beside, the heating performance was more sensitive to EEV opening than the cooling performance. As the compressor speed decreased by 5 Hz, the cooling COP increased by 2%, while the heating COP decreased by 8%

  7. Pumping machinery theory and practice

    CERN Document Server

    Badr, Hassan M

    2014-01-01

    Pumping Machinery Theory and Practice comprehensively covers the theoretical foundation and applications of pumping machinery. Key features: Covers characteristics of centrifugal pumps, axial flow pumps and displacement pumpsConsiders pumping machinery performance and operational-type problemsCovers advanced topics in pumping machinery including multiphase flow principles, and two and three-phase flow pumping systemsCovers different methods of flow rate control and relevance to machine efficiency and energy consumptionCovers different methods of flow rate control and relevance to machine effi

  8. PUMPS

    Science.gov (United States)

    Thornton, J.D.

    1959-03-24

    A pump is described for conveving liquids, particure it is not advisable he apparatus. The to be submerged in the liquid to be pumped, a conduit extending from the high-velocity nozzle of the injector,and means for applying a pulsating prcesure to the surface of the liquid in the conduit, whereby the surface oscillates between positions in the conduit. During the positive half- cycle of an applied pulse liquid is forced through the high velocity nozzle or jet of the injector and operates in the manner of the well known water injector and pumps liquid from the main intake to the outlet of the injector. During the negative half-cycle of the pulse liquid flows in reverse through the jet but no reverse pumping action takes place.

  9. Heat sources for heat pumps in the energetic and economic comparison

    International Nuclear Information System (INIS)

    Bockelmann, Franziska; Fisch, M. Norbert; Schlosser, Mathias; Peter, Markus

    2016-01-01

    Because of the growing application of heat pumps also the number of potentially usable low-temperature heat sources and corresponding heat exchangers for heat-pump systems present in the market increases. Thereby products like energy fences, high-power piles, ore ice reservoir come into applications without any knowledge ab out their power or the cost-profit ratio. The optimized lay-out of the coupling to the building are however essential conditions in order to reach an energy-efficient and durable operation of the facilities. The research project ''future heat pump'' sponsored by the BMWi is dedicated to the energetic and economic evaluation of heat sources for heat pumps. In this connection a pre-check-tool for the preliminary selection of low-temperature heat sources and connected, suitable heat-exchange systems is developed and their actual status of development presented. The holistic, comparing consideration of the different heat sources and heat-exchanger systems is related among others to the power numbers of the heat pumps, the entry and withdrawal services of the heat-exchangers, and the general performance of the systems. Additionally an estimation of economic and ecologic aspects (investment and operation costs, CO_2 emissions) is made. Aim is the determination of the plausibility of applications and essential boundary conditions of single source systems. For the qualitative comparison in a project-accompanying monitoring different facilities and source systems are measurement-technically comprehended.

  10. Aquifer pumping test report for the burn site groundwater area of concern

    Energy Technology Data Exchange (ETDEWEB)

    Skelly, Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ferry, Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-12-01

    The Aquifer Pumping Test Report for the Burn Site Groundwater (BSG) Area of Concern is being submitted by National Technology and Engineering Solutions of Sandia, LLC and the U.S. Department of Energy (DOE)/National Nuclear Security Administration to describe the results of the aquifer pumping test program and related field activities that were completed at the BSG Area of Concern. This report summarizes the results of the field work and data analyses, and is being submitted to the New Mexico Environment Department (NMED) Hazardous Waste Bureau, as required by the April 14, 2016 letter, Summary of Agreements and Proposed Milestones Pursuant to the Meeting of July 20, 2015, (NMED April 2016).

  11. Research of waste heat energy efficiency for absorption heat pump recycling thermal power plant circulating water

    Science.gov (United States)

    Zhang, Li; Zhang, Yu; Zhou, Liansheng; E, Zhijun; Wang, Kun; Wang, Ziyue; Li, Guohao; Qu, Bin

    2018-02-01

    The waste heat energy efficiency for absorption heat pump recycling thermal power plant circulating water has been analyzed. After the operation of heat pump, the influences on power generation and heat generation of unit were taken into account. In the light of the characteristics of heat pump in different operation stages, the energy efficiency of heat pump was evaluated comprehensively on both sides of benefits belonging to electricity and benefits belonging to heat, which adopted the method of contrast test. Thus, the reference of energy efficiency for same type projects was provided.

  12. Study of an electromagnetic pump in a sodium cooled reactor. Design study of secondary sodium main pumps (Joint research)

    International Nuclear Information System (INIS)

    Chikazawa, Yoshitaka; Kisohara, Naoyuki; Hishida, Masahiko; Fujii, Tadashi; Konomura, Mamoru; Ara, Kuniaki; Hori, Toru; Uchida, Akihito; Nishiguchi, Youhei; Nibe, Nobuaki

    2006-07-01

    In the feasibility study on commercialized fast breeder cycle system, a medium scale sodium cooled reactor with 750 MW electricity has been designed. In this study, EMPs are applied to the secondary sodium main pump. The EMPs type is selected to be an annular linear induction pump (ALIP) type with double stators which is used in the 160 m 3 /min EMP demonstration test. The inner structure and electromagnetic features are decided reviewing the 160 m 3 /min EMP. Two dimensional electromagnetic fluid analyses by EAGLE code show that Rms (magnetic Reynolds number times slip) is evaluated to be 1.08 which is less than the stability limit 1.4 confirmed by the 160 m 3 /min EMP test, and the instability of the pump head is evaluated to be 3% of the normal operating pump head. Since the EMP stators are cooled by contacting coolant sodium duct, reliability of the inner structures are confirmed by temperature distribution and stator-duct contact pressure analyses. Besides, a power supply system, maintenance and repair feature and R and D plan of EMP are reported. (author)

  13. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid

  15. Experimental Study of Unshrouded Impeller Pump Stage Sensitivity to Tip Clearance

    Science.gov (United States)

    Williams, Robert W.; Zoladz, Thomas; Storey, Anne K.; Skelley, Stephen E.

    2002-01-01

    This viewgraph presentation provides information on an experiment. Its objective is to experimentally determine unshrouded impeller performance sensitivity to tip clearance. The experiment included: Determining impeller efficiency at scaled operating conditions in water at MSFC's Pump Test Equipment (PTE) Facility; Testing unshrouded impeller at three different tip clearances; Testing each tip clearance configuration at on- and off-design conditions, and collecting unsteady- and steady-state data in each configuration; Determining impeller efficiency directly using drive line torquemeter and pump inlet and exit total pressure measurements.

  16. Does pre-operative psychological distress affect patient satisfaction after primary total hip arthroplasty?

    Directory of Open Access Journals (Sweden)

    Nolan John

    2011-06-01

    Full Text Available Abstract Background There are concerns that pre-operative psychological distress might be associated with reduced patient satisfaction after total hip replacement (THR. Methods We investigated this in a multi-centre prospective study between January 1999 and January 2002. We dichotomised the patients into the mentally distressed (MHS ≤ 56 and the not mentally distressed (MHS > 56 groups based on their pre-operative Mental Health Score (MHS of SF36. Results 448 patients (340 not distressed and 108 distressed completed the patient satisfaction survey. Patient satisfaction rate at five year was 96.66% (415/448. There was no difference in patient satisfaction or willingness to have the surgery between the two groups. None of pre-operative variables predicted five year patient satisfaction in logistic regression. Conclusions Patient satisfaction after surgery may not be adversely affected by pre-operative psychological distress.

  17. Annular electromagnetic pumps-construction and testing-theory, and comparison with experimental results

    International Nuclear Information System (INIS)

    Cambillard, E.P.; Schwab, B.L.

    1964-01-01

    This report consists of three sections. The first is concerned with the description of different pumps which have been constructed, tests on these which have been completed and the results obtained. The second section presents a theoretical method for the determination of the coefficients, taking in account the break of the magnetic circuit. It is shown that the preliminary design calculations of the annular pumps can be made, neglecting the break of the magnetic circuit, by further assigning essential magnitudes (pressure, losses) with easily calculated coefficients. The third section of this report uses the theoretical bases exposed in the second section, and develop a new annular pump calculation method which takes-into account both the current out of balance and any type of winding. (authors) [fr

  18. Effect Analysis of Geometric Parameters on Stainless Steel Stamping Multistage Pump by Experimental Test and Numerical Calculation

    Directory of Open Access Journals (Sweden)

    Chuan Wang

    2013-01-01

    Full Text Available In order to improve the efficiency of stainless steel stamping multistage pump, quadratic regression orthogonal test, hydraulic design, and computational fluid dynamics (CFD are used to analyze the effect of pump geometric parameters. Sixteen impellers are designed based on the quadratic regression orthogonal test, which have three factors including impeller outlet slope, impeller blade outlet stagger angle, and impeller blade outlet width. Through quadratic regression equation, the function relationship between efficiency values and three factors is established. The optimal combination of geometric parameters is found through the analysis of the regression equation. To further study the influence of blade thickness on the performance of multistage pump, numerical simulations of multistage pump with different blade thicknesses are carried out. The influence law of blade thickness on pump performance is built from the external characteristics and internal flow field. In conclusion, with the increase of blade thickness, the best efficiency point of the pump shifts to the small flow rate direction, and the vortex regions inside the pump at rated flow gradually increase, which is the main reason that pump efficiency decreases along with the increase of the blade thickness at rated flow.

  19. Inverse modelling of aquifer parameters in basaltic rock with the help of pumping test method using MODFLOW software

    Directory of Open Access Journals (Sweden)

    Kanak Moharir

    2017-11-01

    The present study of estimation of aquifer factors such as transmissivity (T and storativity (S are vital for the evaluation of groundwater resources. There are several methods to estimate the accurate aquifer parameters (i.e. hydrograph analysis, pumping test, etc.. In initial days, these parameters are projected either by means of in-situ test or execution test on aquifer well samples carried in the laboratory. The simultaneous information on the hydraulic behavior of the well (borehole that provides on this method, the reservoir and the reservoir boundaries, are important for efficient aquifer and well data management and analysis. The most common in-situ test is pumping test performed on wells, which involves the measurement of the fall and increase of groundwater level with respect to time. The alteration in groundwater level (drawdown/recovery is caused due to pumping of water from the well. Theis (1935 was first to propose method to evaluate aquifer parameters from the pumping test on a bore well in a confined aquifer. It is essential to know the transmissivity (T = Kb, where b is the aquifer thickness; pumping flow rate, Q = TW (dh/dl flow through an aquifer and storativity (confined aquifer: S = bSs, unconfined: S = Sy, for the characterization of the aquifer parameters in an unknown area so as to predict the rate of drawdown of the groundwater table/potentiometric surface throughout the pumping test of an aquifer. The determination of aquifer's parameters is an important basis for groundwater resources evaluation, numerical simulation, development and protection as well as scientific management. For determining aquifer's parameters, pumping test is a main method. A case study shows that these techniques have been fast speed and high correctness. The results of parameter's determination are optimized so that it has important applied value for scientific research and geology engineering preparation.

  20. Experimental Realization of a Quantum Spin Pump

    DEFF Research Database (Denmark)

    Watson, Susan; Potok, R.; M. Marcus, C.

    2003-01-01

    We demonstrate the operation of a quantum spin pump based on cyclic radio-frequency excitation of a GaAs quantum dot, including the ability to pump pure spin without pumping charge. The device takes advantage of bidirectional mesoscopic fluctuations of pumped current, made spin-dependent by the a......We demonstrate the operation of a quantum spin pump based on cyclic radio-frequency excitation of a GaAs quantum dot, including the ability to pump pure spin without pumping charge. The device takes advantage of bidirectional mesoscopic fluctuations of pumped current, made spin......-dependent by the application of an in-plane Zeeman field. Spin currents are measured by placing the pump in a focusing geometry with a spin-selective collector....