  1. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  2. Scheduling of Power System Cells Integrating Stochastic Power Generation

    International Nuclear Information System (INIS)

    Costa, L.M.

    2008-12-01

    Energy supply and climate change are nowadays two of the most outstanding problems which societies have to cope with under a context of increasing energy needs. Public awareness of these problems is driving political willingness to take actions for tackling them in a swift and efficient manner. Such actions mainly focus in increasing energy efficiency, in decreasing dependence on fossil fuels, and in reducing greenhouse gas emissions. In this context, power systems are undergoing important changes in the way they are planned and managed. On the one hand, vertically integrated structures are being replaced by market structures in which power systems are un-bundled. On the other, power systems that once relied on large power generation facilities are witnessing the end of these facilities' life-cycle and, consequently, their decommissioning. The role of distributed energy resources such as wind and solar power generators is becoming increasingly important in this context. However, the large-scale integration of such type of generation presents many challenges due, for instance, to the uncertainty associated to the variability of their production. Nevertheless, advanced forecasting tools may be combined with more controllable elements such as energy storage devices, gas turbines, and controllable loads to form systems that aim to reduce the impacts that may be caused by these uncertainties. This thesis addresses the management under market conditions of these types of systems that act like independent societies and which are herewith named power system cells. From the available literature, a unified view of power system scheduling problems is also proposed as a first step for managing sets of power system cells in a multi-cell management framework. Then, methodologies for performing the optimal day-ahead scheduling of single power system cells are proposed, discussed and evaluated under both a deterministic and a stochastic framework that directly integrates the

  3. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  4. Power-scheduling - Introduction of the FPBG1 System

    International Nuclear Information System (INIS)

    Braun, A.; Meier, W.

    2006-01-01

    This article takes a look at the Scheduled Balance Group system (in German: 'Fahrplanbilanzgruppensystem', FPBG) which was successfully introduced in Switzerland in December 2005. The development of the system is described and the reasons for the development of a new concept for Switzerland are discussed. The system permits the use of standard European scheduling processes for national and international power traders and supports Switzerland's function as an important power hub in Europe. The basics behind the concept are discussed and the mechanisms of its functioning are illustrated in graphical form. The implementation of the system by the ETRANS company is looked at and various questions posed in this connection are answered

  5. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  6. Electric power systems advanced forecasting techniques and optimal generation scheduling

    CERN Document Server

    Catalão, João P S

    2012-01-01

    Overview of Electric Power Generation SystemsCláudio MonteiroUncertainty and Risk in Generation SchedulingRabih A. JabrShort-Term Load ForecastingAlexandre P. Alves da Silva and Vitor H. FerreiraShort-Term Electricity Price ForecastingNima AmjadyShort-Term Wind Power ForecastingGregor Giebel and Michael DenhardPrice-Based Scheduling for GencosGovinda B. Shrestha and Songbo QiaoOptimal Self-Schedule of a Hydro Producer under UncertaintyF. Javier Díaz and Javie

  7. Rolling scheduling of electric power system with wind power based on improved NNIA algorithm

    Science.gov (United States)

    Xu, Q. S.; Luo, C. J.; Yang, D. J.; Fan, Y. H.; Sang, Z. X.; Lei, H.

    2017-11-01

    This paper puts forth a rolling modification strategy for day-ahead scheduling of electric power system with wind power, which takes the operation cost increment of unit and curtailed wind power of power grid as double modification functions. Additionally, an improved Nondominated Neighbor Immune Algorithm (NNIA) is proposed for solution. The proposed rolling scheduling model has further improved the operation cost of system in the intra-day generation process, enhanced the system’s accommodation capacity of wind power, and modified the key transmission section power flow in a rolling manner to satisfy the security constraint of power grid. The improved NNIA algorithm has defined an antibody preference relation model based on equal incremental rate, regulation deviation constraints and maximum & minimum technical outputs of units. The model can noticeably guide the direction of antibody evolution, and significantly speed up the process of algorithm convergence to final solution, and enhance the local search capability.

  8. An On-Time Power-Aware Scheduling Scheme for Medical Sensor SoC-Based WBAN Systems

    Science.gov (United States)

    Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk

    2013-01-01

    The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network—a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices. PMID:23271602

  9. An on-time power-aware scheduling scheme for medical sensor SoC-based WBAN systems.

    Science.gov (United States)

    Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk

    2012-12-27

    The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network-a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices.

  10. Research on Power System Scheduling Improving Wind Power Accommodation Considering Thermal Energy Storage and Flexible Load

    Science.gov (United States)

    Zou, Chenlu; Cui, Xue; Wang, Heng; Zhou, Bin; Liu, Yang

    2018-01-01

    In the case of rapid development of wind power and heavy wind curtailment, the study of wind power accommodation of combined heat and power system has become the focus of attention. A two-stage scheduling model contains of wind power, thermal energy storage, CHP unit and flexible load were constructed. This model with the objective function of minimizing wind curtailment and the operation cost of units while taking into account of the total coal consumption of units, constraint of thermal energy storage and electricity-heat characteristic of CHP. This paper uses MICA to solve the problem of too many constraints and make the solution more feasible. A numerical example showed that the two stage decision scheduling model can consume more wind power, and it could provide a reference for combined heat and power system short-term operation

  11. An On-Time Power-Aware Scheduling Scheme for Medical Sensor SoC-Based WBAN Systems

    Directory of Open Access Journals (Sweden)

    Jung-Guk Kim

    2012-12-01

    Full Text Available The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD, which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time and the power consumption optimization. The scheduler was embedded into a system on chip (SoC developed to support the wireless body area network—a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices.

  12. Distributed decision-making in electric power system transmission maintenance scheduling using multi-agent systems (MAS)

    Science.gov (United States)

    Zhang, Zhong

    In this work, motivated by the need to coordinate transmission maintenance scheduling among a multiplicity of self-interested entities in restructured power industry, a distributed decision support framework based on multiagent negotiation systems (MANS) is developed. An innovative risk-based transmission maintenance optimization procedure is introduced. Several models for linking condition monitoring information to the equipment's instantaneous failure probability are presented, which enable quantitative evaluation of the effectiveness of maintenance activities in terms of system cumulative risk reduction. Methodologies of statistical processing, equipment deterioration evaluation and time-dependent failure probability calculation are also described. A novel framework capable of facilitating distributed decision-making through multiagent negotiation is developed. A multiagent negotiation model is developed and illustrated that accounts for uncertainty and enables social rationality. Some issues of multiagent negotiation convergence and scalability are discussed. The relationships between agent-based negotiation and auction systems are also identified. A four-step MAS design methodology for constructing multiagent systems for power system applications is presented. A generic multiagent negotiation system, capable of inter-agent communication and distributed decision support through inter-agent negotiations, is implemented. A multiagent system framework for facilitating the automated integration of condition monitoring information and maintenance scheduling for power transformers is developed. Simulations of multiagent negotiation-based maintenance scheduling among several independent utilities are provided. It is shown to be a viable alternative solution paradigm to the traditional centralized optimization approach in today's deregulated environment. This multiagent system framework not only facilitates the decision-making among competing power system entities, but

  13. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  14. Short term economic emission power scheduling of hydrothermal energy systems using improved water cycle algorithm

    International Nuclear Information System (INIS)

    Haroon, S.S.; Malik, T.N.

    2017-01-01

    Due to the increasing environmental concerns, the demand of clean and green energy and concern of atmospheric pollution is increasing. Hence, the power utilities are forced to limit their emissions within the prescribed limits. Therefore, the minimization of fuel cost as well as exhaust gas emissions is becoming an important and challenging task in the short-term scheduling of hydro-thermal energy systems. This paper proposes a novel algorithm known as WCA-ER (Water Cycle Algorithm with Evaporation Rate) to inspect the short term EEPSHES (Economic Emission Power Scheduling of Hydrothermal Energy Systems). WCA has its ancestries from the natural hydrologic cycle i.e. the raining process forms streams and these streams start flowing towards the rivers which finally flow towards the sea. The worth of WCA-ER has been tested on the standard economic emission power scheduling of hydrothermal energy test system consisting of four hydropower and three thermal plants. The problem has been investigated for the three case studies (i) ECS (Economic Cost Scheduling), (ii) ES (Economic Emission Scheduling) and (iii) ECES (Economic Cost and Emission Scheduling). The results obtained show that WCA-ER is superior to many other methods in the literature in bringing lower fuel cost and emissions. (author)

  15. Modeling the transient security constraints of natural gas network in day-ahead power system scheduling

    DEFF Research Database (Denmark)

    Yang, Jingwei; Zhang, Ning; Kang, Chongqing

    2017-01-01

    The rapid deployment of gas-fired generating units makes the power system more vulnerable to failures in the natural gas system. To reduce the risk of gas system failure and to guarantee the security of power system operation, it is necessary to take the security constraints of natural gas...... accurately, they are hard to be embedded into the power system scheduling model, which consists of algebraic equations and inequations. This paper addresses this dilemma by proposing an algebraic transient model of natural gas network which is similar to the branch-node model of power network. Based...... pipelines into account in the day-ahead power generation scheduling model. However, the minute- and hour-level dynamic characteristics of gas systems prevents an accurate decision-making simply with the steady-state gas flow model. Although the partial differential equations depict the dynamics of gas flow...

  16. A Multiobjective Robust Scheduling Optimization Mode for Multienergy Hybrid System Integrated by Wind Power, Solar Photovoltaic Power, and Pumped Storage Power

    Directory of Open Access Journals (Sweden)

    Lihui Zhang

    2017-01-01

    Full Text Available Wind power plant (WPP, photovoltaic generators (PV, cell-gas turbine (CGT, and pumped storage power station (PHSP are integrated into multienergy hybrid system (MEHS. Firstly, this paper presents MEHS structure and constructs a scheduling model with the objective functions of maximum economic benefit and minimum power output fluctuation. Secondly, in order to relieve the uncertainty influence of WPP and PV on system, robust stochastic theory is introduced to describe uncertainty and propose a multiobjective stochastic scheduling optimization mode by transforming constraint conditions with uncertain variables. Finally, a 9.6 MW WPP, a 6.5 MW PV, three CGT units, and an upper reservoir with 10 MW·h equivalent capacity are chosen as simulation system. The results show MEHS system can achieve the best operation result by using the multienergy hybrid generation characteristic. PHSP could shave peak and fill valley of load curve by optimizing pumping storage and inflowing generating behaviors based on the load supply and demand status and the available power of WPP and PV. Robust coefficients can relieve the uncertainty of WPP and PV and provide flexible scheduling decision tools for decision-makers with different risk attitudes by setting different robust coefficients, which could maximize economic benefits and minimize operation risks at the same time.

  17. Optimal power system generation scheduling by multi-objective genetic algorithms with preferences

    International Nuclear Information System (INIS)

    Zio, E.; Baraldi, P.; Pedroni, N.

    2009-01-01

    Power system generation scheduling is an important issue both from the economical and environmental safety viewpoints. The scheduling involves decisions with regards to the units start-up and shut-down times and to the assignment of the load demands to the committed generating units for minimizing the system operation costs and the emission of atmospheric pollutants. As many other real-world engineering problems, power system generation scheduling involves multiple, conflicting optimization criteria for which there exists no single best solution with respect to all criteria considered. Multi-objective optimization algorithms, based on the principle of Pareto optimality, can then be designed to search for the set of nondominated scheduling solutions from which the decision-maker (DM) must a posteriori choose the preferred alternative. On the other hand, often, information is available a priori regarding the preference values of the DM with respect to the objectives. When possible, it is important to exploit this information during the search so as to focus it on the region of preference of the Pareto-optimal set. In this paper, ways are explored to use this preference information for driving a multi-objective genetic algorithm towards the preferential region of the Pareto-optimal front. Two methods are considered: the first one extends the concept of Pareto dominance by biasing the chromosome replacement step of the algorithm by means of numerical weights that express the DM' s preferences; the second one drives the search algorithm by changing the shape of the dominance region according to linear trade-off functions specified by the DM. The effectiveness of the proposed approaches is first compared on a case study of literature. Then, a nonlinear, constrained, two-objective power generation scheduling problem is effectively tackled

  18. Scheduled power tracking control of the wind-storage hybrid system based on the reinforcement learning theory

    Science.gov (United States)

    Li, Ze

    2017-09-01

    In allusion to the intermittency and uncertainty of the wind electricity, energy storage and wind generator are combined into a hybrid system to improve the controllability of the output power. A scheduled power tracking control method is proposed based on the reinforcement learning theory and Q-learning algorithm. In this method, the state space of the environment is formed with two key factors, i.e. the state of charge of the energy storage and the difference value between the actual wind power and scheduled power, the feasible action is the output power of the energy storage, and the corresponding immediate rewarding function is designed to reflect the rationality of the control action. By interacting with the environment and learning from the immediate reward, the optimal control strategy is gradually formed. After that, it could be applied to the scheduled power tracking control of the hybrid system. Finally, the rationality and validity of the method are verified through simulation examples.

  19. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  20. Systematic Evaluation of Stochastic Methods in Power System Scheduling and Dispatch with Renewable Energy

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Yishen [Univ. of Washington, Seattle, WA (United States); Argonne National Lab. (ANL), Argonne, IL (United States); Zhou, Zhi [Argonne National Lab. (ANL), Argonne, IL (United States); Liu, Cong [Argonne National Lab. (ANL), Argonne, IL (United States); Electric Reliability Council of Texas (ERCOT), Austin, TX (United States); Botterud, Audun [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    As more wind power and other renewable resources are being integrated into the electric power grid, the forecast uncertainty brings operational challenges for the power system operators. In this report, different operational strategies for uncertainty management are presented and evaluated. A comprehensive and consistent simulation framework is developed to analyze the performance of different reserve policies and scheduling techniques under uncertainty in wind power. Numerical simulations are conducted on a modified version of the IEEE 118-bus system with a 20% wind penetration level, comparing deterministic, interval, and stochastic unit commitment strategies. The results show that stochastic unit commitment provides a reliable schedule without large increases in operational costs. Moreover, decomposition techniques, such as load shift factor and Benders decomposition, can help in overcoming the computational obstacles to stochastic unit commitment and enable the use of a larger scenario set to represent forecast uncertainty. In contrast, deterministic and interval unit commitment tend to give higher system costs as more reserves are being scheduled to address forecast uncertainty. However, these approaches require a much lower computational effort Choosing a proper lower bound for the forecast uncertainty is important for balancing reliability and system operational cost in deterministic and interval unit commitment. Finally, we find that the introduction of zonal reserve requirements improves reliability, but at the expense of higher operational costs.

  1. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  2. Multi-Time Scale Coordinated Scheduling Strategy with Distributed Power Flow Controllers for Minimizing Wind Power Spillage

    Directory of Open Access Journals (Sweden)

    Yi Tang

    2017-11-01

    Full Text Available The inherent variability and randomness of large-scale wind power integration have brought great challenges to power flow control and dispatch. The distributed power flow controller (DPFC has the higher flexibility and capacity in power flow control in the system with wind generation. This paper proposes a multi-time scale coordinated scheduling model with DPFC to minimize wind power spillage. Configuration of DPFCs is initially determined by stochastic method. Afterward, two sequential procedures containing day-head and real-time scales are applied for determining maximum schedulable wind sources, optimal outputs of generating units and operation setting of DPFCs. The generating plan is obtained initially in day-ahead scheduling stage and modified in real-time scheduling model, while considering the uncertainty of wind power and fast operation of DPFC. Numerical simulation results in IEEE-RTS79 system illustrate that wind power is maximum scheduled with the optimal deployment and operation of DPFC, which confirms the applicability and effectiveness of the proposed method.

  3. An Optimization Scheduling Model for Wind Power and Thermal Power with Energy Storage System considering Carbon Emission Trading

    Directory of Open Access Journals (Sweden)

    Huan-huan Li

    2015-01-01

    Full Text Available Wind power has the characteristics of randomness and intermittence, which influences power system safety and stable operation. To alleviate the effect of wind power grid connection and improve power system’s wind power consumptive capability, this paper took emission trading and energy storage system into consideration and built an optimization model for thermal-wind power system and energy storage systems collaborative scheduling. A simulation based on 10 thermal units and wind farms with 2800 MW installed capacity verified the correctness of the models put forward by this paper. According to the simulation results, the introduction of carbon emission trading can improve wind power consumptive capability and cut down the average coal consumption per unit of power. The introduction of energy storage system can smooth wind power output curve and suppress power fluctuations. The optimization effects achieve the best when both of carbon emission trading and energy storage system work at the same time.

  4. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  5. Scheduling Model for Renewable Energy Sources Integration in an Insular Power System

    Directory of Open Access Journals (Sweden)

    Gerardo J. Osório

    2018-01-01

    Full Text Available Insular power systems represent an asset and an excellent starting point for the development and analysis of innovative tools and technologies. The integration of renewable energy resources that has taken place in several islands in the south of Europe, particularly in Portugal, has brought more uncertainty to production management. In this work, an innovative scheduling model is proposed, which considers the integration of wind and solar resources in an insular power system in Portugal, with a strong conventional generation basis. This study aims to show the benefits of increasing the integration of renewable energy resources in this insular power system, and the objectives are related to minimizing the time for which conventional generation is in operation, maximizing profits, reducing production costs, and consequently, reducing greenhouse gas emissions.

  6. Voltage scheduling for low power/energy

    Science.gov (United States)

    Manzak, Ali

    2001-07-01

    Power considerations have become an increasingly dominant factor in the design of both portable and desk-top systems. An effective way to reduce power consumption is to lower the supply voltage since voltage is quadratically related to power. This dissertation considers the problem of lowering the supply voltage at (i) the system level and at (ii) the behavioral level. At the system level, the voltage of the variable voltage processor is dynamically changed with the work load. Processors with limited sized buffers as well as those with very large buffers are considered. Given the task arrival times, deadline times, execution times, periods and switching activities, task scheduling algorithms that minimize energy or peak power are developed for the processors equipped with very large buffers. A relation between the operating voltages of the tasks for minimum energy/power is determined using the Lagrange multiplier method, and an iterative algorithm that utilizes this relation is developed. Experimental results show that the voltage assignment obtained by the proposed algorithm is very close (0.1% error) to that of the optimal energy assignment and the optimal peak power (1% error) assignment. Next, on-line and off-fine minimum energy task scheduling algorithms are developed for processors with limited sized buffers. These algorithms have polynomial time complexity and present optimal (off-line) and close-to-optimal (on-line) solutions. A procedure to calculate the minimum buffer size given information about the size of the task (maximum, minimum), execution time (best case, worst case) and deadlines is also presented. At the behavioral level, resources operating at multiple voltages are used to minimize power while maintaining the throughput. Such a scheme has the advantage of allowing modules on the critical paths to be assigned to the highest voltage levels (thus meeting the required timing constraints) while allowing modules on non-critical paths to be assigned

  7. Economic-environmental active and reactive power scheduling of modern distribution systems in presence of wind generations: A distribution market-based approach

    International Nuclear Information System (INIS)

    Samimi, Abouzar; Kazemi, Ahad; Siano, Pierluigi

    2015-01-01

    Highlights: • A new market-based approach is proposed to schedule active and reactive powers. • Multi-component reactive power bidding structures for DERs is introduced. • A new economical/environmental operational scheduling method is proposed. • At distribution level, a reactive power market is developed in presence of DERs. - Abstract: Distribution System Operator (DSO) is responsible for active and reactive power scheduling in a distribution system. DSO purchases its active and reactive power requirements from Distributed Energy Resources (DERs) as well as the wholesale electricity market. In this paper, a new economical/environmental operational scheduling method based on sequential day-ahead active and reactive power markets at distribution level is proposed to dispatch active and reactive powers in distribution systems with high penetration of DERs. In the proposed model, after day-ahead active power market was cleared the participants submit their reactive power bids and then the reactive power market will be settled. At distribution level, developing a Var market, in which DERs like synchronous machine-based Distributed Generation (DG) units and Wind Turbines (WTs) could offer their reactive power prices, DERs are motivated to actively participate in the Volt/VAr Control (VVC) problem. To achieve this purpose, based on the capability curves of considered DERs, innovative multi-component reactive power bidding structures for DERs are introduced. Moreover, the effect of reactive power market clearing on the active power scheduling is explicitly considered into the proposed model by rescheduling of active power by usage of energy-balance service bids. On the other hand, environmental concerns that arise from the operation of fossil fuel fired electric generators are included in the proposed model by employing CO_2 emission penalty cost. The suggested reactive power market is cleared through a mixed-integer nonlinear optimization program. The

  8. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  9. Strategic Maintenance Scheduling of an Offshore Wind Farm in a Deregulated Power System

    Directory of Open Access Journals (Sweden)

    Peyman Mazidi

    2017-03-01

    Full Text Available This paper proposes a model for strategic maintenance scheduling of offshore wind farms (SMSOWF in a deregulated power system. The objective of the model is to plan the maintenance schedules in a way to maximize the profit of the offshore wind farm. In addition, some network constraints, such as transmission lines capacity, and wind farm constraints, such as labor working shift, wave height limit and wake effect, as well as unexpected outages, are included in deterministic and stochastic studies. Moreover, the proposedmodel provides theability to incorporate information from condition monitoring systems. SMSOWF is formulated through a bi-level formulation and then transformed into a single-level through Karush–Kuhn–Tucker conditions. The model is validated through a test system, and the results demonstrate applicability, advantages and challenges of harnessing the full potential of the model.

  10. Development of the Optimum Operation Scheduling Model of Domestic Electric Appliances for the Supply-Demand Adjustment in a Power System

    Science.gov (United States)

    Ikegami, Takashi; Iwafune, Yumiko; Ogimoto, Kazuhiko

    The high penetration of variable renewable generation such as Photovoltaic (PV) systems will cause the issue of supply-demand imbalance in a whole power system. The activation of the residential power usage, storage and generation by sophisticated scheduling and control using the Home Energy Management System (HEMS) will be needed to balance power supply and demand in the near future. In order to evaluate the applicability of the HEMS as a distributed controller for local and system-wide supply-demand balances, we developed an optimum operation scheduling model of domestic electric appliances using the mixed integer linear programming. Applying this model to several houses with dynamic electricity prices reflecting the power balance of the total power system, it was found that the adequate changes in electricity prices bring about the shift of residential power usages to control the amount of the reverse power flow due to excess PV generation.

  11. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  12. Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach

    International Nuclear Information System (INIS)

    Lee, T.-Y.

    2008-01-01

    This paper uses multi-pass iteration particle swarm optimization (MIPSO) to solve short term hydroelectric generation scheduling of a power system with wind turbine generators. MIPSO is a new algorithm for solving nonlinear optimal scheduling problems. A new index called iteration best (IB) is incorporated into particle swarm optimization (PSO) to improve solution quality. The concept of multi-pass dynamic programming is applied to modify PSO further and improve computation efficiency. The feasible operational regions of the hydro units and pumped storage plants over the whole scheduling time range must be determined before applying MIPSO to the problem. Wind turbine power generation then shaves the power system load curves. Next, MIPSO calculates hydroelectric generation scheduling. It begins with a coarse time stage and searching space and refines the time interval between two time stages and the search spacing pass by pass (iteration). With the cooperation of agents called particles, the near optimal solution of the scheduling problem can be effectively reached. The effects of wind speed uncertainty were also considered in this paper. The feasibility of the new algorithm is demonstrated by a numerical example, and MIPSO solution quality and computation efficiency are compared to those of other algorithms

  13. Sensor Transmission Power Schedule for Smart Grids

    Science.gov (United States)

    Gao, C.; Huang, Y. H.; Li, J.; Liu, X. D.

    2017-11-01

    Smart grid has attracted much attention by the requirement of new generation renewable energy. Nowadays, the real-time state estimation, with the help of phasor measurement unit, plays an important role to keep smart grid stable and efficient. However, the limitation of the communication channel is not considered by related work. Considering the familiar limited on-board batteries wireless sensor in smart grid, transmission power schedule is designed in this paper, which minimizes energy consumption with proper EKF filtering performance requirement constrain. Based on the event-triggered estimation theory, the filtering algorithm is also provided to utilize the information contained in the power schedule. Finally, its feasibility and performance is demonstrated using the standard IEEE 39-bus system with phasor measurement units (PMUs).

  14. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  15. Scheduled Operation of PV Power Station Considering Solar Radiation Forecast Error

    Science.gov (United States)

    Takayama, Satoshi; Hara, Ryoichi; Kita, Hiroyuki; Ito, Takamitsu; Ueda, Yoshinobu; Saito, Yutaka; Takitani, Katsuyuki; Yamaguchi, Koji

    Massive penetration of photovoltaic generation (PV) power stations may cause some serious impacts on a power system operation due to their volatile and unpredictable output. Growth of uncertainty may require larger operating reserve capacity and regulating capacity. Therefore, in order to utilize a PV power station as an alternative for an existing power plant, improvement in controllability and adjustability of station output become very important factor. Purpose of this paper is to develop the scheduled operation technique using a battery system (NAS battery) and the meteorological forecast. The performance of scheduled operation strongly depends on the accuracy of solar radiation forecast. However, the solar radiation forecast contains error. This paper proposes scheduling method and rescheduling method considering the trend of forecast error. More specifically, the forecast error scenario is modeled by means of the clustering analysis of the past actual forecast error. Validity and effectiveness of the proposed method is ascertained through computational simulations using the actual PV generation data monitored at the Wakkanai PV power station and solar radiation forecast data provided by the Japan Weather Association.

  16. Economic power schedule and transactive energy through an intelligent centralized energy management system for a DC residential distribution system

    DEFF Research Database (Denmark)

    Yue, Jingpeng; Hu, Zhijian; Li, Chendan

    2017-01-01

    Direct current (DC) residential distribution systems (RDS) consisting of DC living homes will be a significant integral part of future green transmission. Meanwhile, the increasing number of distributed resources and intelligent devices will change the power flow between the main grid...... (CEMS), but also a control approach to implement and ensure DG output voltages to various DC buses in a DC RDS. Based on data collection, prediction and a certain objectives, the expert system in a CEMS can work out the optimization schedule, after this, the voltage droop control for steady voltage...... is aligned with the command of the unit power schedule. In this work, a DC RDS is used as a case study to demonstrate the process, the RDS is associated with unit economic models, and a cost minimization objective is proposed that is to be achieved based on the real-time electrical price. The results show...

  17. Optimization of Temperature Schedule Parameters on Heat Supply in Power-and-Heat Supply Systems

    Directory of Open Access Journals (Sweden)

    V. A. Sednin

    2009-01-01

    Full Text Available The paper considers problems concerning optimization of a temperature schedule in the district heating systems with steam-turbine thermal power stations having average initial steam parameters. It has been shown in the paper that upkeeping of an optimum network water temperature permits to increase an energy efficiency of heat supply due to additional systematic saving of fuel. 

  18. Economic power schedule and transactive energy through an intelligent centralized energy management system for a DC residential distribution system

    DEFF Research Database (Denmark)

    Yue, Jingpeng; Hu, Zhijian; Li, Chendan

    2017-01-01

    and the demand side. The utilization of distributed generation (DG) requires an economic operation, stability, and an environmentally friendly approach in the whole DC system. This paper not only presents an optimization schedule and transactive energy (TE) approach through a centralized energy management system...... is aligned with the command of the unit power schedule. In this work, a DC RDS is used as a case study to demonstrate the process, the RDS is associated with unit economic models, and a cost minimization objective is proposed that is to be achieved based on the real-time electrical price. The results show...... that the proposed framework and methods will help the targeted DC residential system to reduce the total cost and reach stability and efficiency....

  19. Tri-generation based hybrid power plant scheduling for renewable resources rich area with energy storage

    International Nuclear Information System (INIS)

    Pazheri, F.R.

    2015-01-01

    Highlights: • Involves scheduling of the tri-generation based hybrid power plant. • Utilization of renewable energy through energy storage is discussed. • Benefits of the proposed model are illustrated. • Energy efficient and environmental friendly dispatch is analyzed. • Modeled scheduling problem is applicable to any fuel enriched area. - Abstract: Solving power system scheduling is crucial to ensure smooth operations of the electric power industry. Effective utilization of available conventional and renewable energy sources (RES) by tri-generation and with the aid of energy storage facilities (ESF) can ensure clean and energy efficient power generation. Such power generation can play an important role in countries, like Saudi Arabia, where abundant fossil fuels (FF) and renewable energy sources (RES) are available. Hence, effective modeling of such hybrid power systems scheduling is essential in such countries based on the available fuel resources. The intent of this paper is to present a simple model for tri-generation based hybrid power system scheduling for energy resources rich area in presence of ESF, to ensure optimum fuel utilization and minimum pollutant emissions while meeting the power demand. This research points an effective operation strategy which ensure a clean and energy efficient power scheduling by exploiting available energy resources effectively. Hence, it has an important role in current and future power generation. In order to illustrate the benefits of the presented approach a clean and energy efficient hybrid power supply scheme for King Saud University (KSU), Saudi Arabia, is proposed and analyzed here. Results show that the proposed approach is very suitable for KSU since adequate solar power is available during its peak demand periods

  20. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  1. Scheduling for energy and reliability management on multiprocessor real-time systems

    Science.gov (United States)

    Qi, Xuan

    Scheduling algorithms for multiprocessor real-time systems have been studied for years with many well-recognized algorithms proposed. However, it is still an evolving research area and many problems remain open due to their intrinsic complexities. With the emergence of multicore processors, it is necessary to re-investigate the scheduling problems and design/develop efficient algorithms for better system utilization, low scheduling overhead, high energy efficiency, and better system reliability. Focusing cluster schedulings with optimal global schedulers, we study the utilization bound and scheduling overhead for a class of cluster-optimal schedulers. Then, taking energy/power consumption into consideration, we developed energy-efficient scheduling algorithms for real-time systems, especially for the proliferating embedded systems with limited energy budget. As the commonly deployed energy-saving technique (e.g. dynamic voltage frequency scaling (DVFS)) will significantly affect system reliability, we study schedulers that have intelligent mechanisms to recuperate system reliability to satisfy the quality assurance requirements. Extensive simulation is conducted to evaluate the performance of the proposed algorithms on reduction of scheduling overhead, energy saving, and reliability improvement. The simulation results show that the proposed reliability-aware power management schemes could preserve the system reliability while still achieving substantial energy saving.

  2. Gain-Scheduled Control of a Fossil-Fired Power Plant Boiler

    DEFF Research Database (Denmark)

    Hangstrup, M.; Stoustrup, Jakob; Andersen, Palle

    1999-01-01

    -scheduling which interpolates between unstable controllers is not allowed using traditional schemes. The results show that a considerable optimization of the conventional controlled system is obtainable. Also the gain-scheduled optimizing controller is seen to have a superior performance compared to the fixed LTI......In this paper the objective is to optimize the control of a coal fired 250 MW power plant boiler. The conventional control system is supplemented with a multivariable optimizing controller operating in parallel with the conventional control system. Due to the strong dependence of the gains...... and dynamics upon the load, it is beneficial to consider a gain-scheduling control approach. Optimization using complex mu synthesis results in unstable LTI controllers in some operating points of the boiler. A recent gain-scheduling approach allowing for unstable fixed LTI controllers is applied. Gain...

  3. Application of cultural algorithm to generation scheduling of hydrothermal systems

    International Nuclear Information System (INIS)

    Yuan Xiaohui; Yuan Yanbin

    2006-01-01

    The daily generation scheduling of hydrothermal power systems plays an important role in the operation of electric power systems for economics and security, which is a large scale dynamic non-linear constrained optimization problem. It is difficult to solve using traditional optimization methods. This paper proposes a new cultural algorithm to solve the optimal daily generation scheduling of hydrothermal power systems. The approach takes the water transport delay time between connected reservoirs into consideration and can conveniently deal with the complicated hydraulic coupling simultaneously. An example is used to verify the correctness and effectiveness of the proposed cultural algorithm, comparing with both the Lagrange method and the genetic algorithm method. The simulation results demonstrate that the proposed algorithm has rapid convergence speed and higher solution precision. Thus, an effective method is provided to solve the optimal daily generation scheduling of hydrothermal systems

  4. A Practical Framework to Study Low-Power Scheduling Algorithms on Real-Time and Embedded Systems

    Directory of Open Access Journals (Sweden)

    Jian (Denny Lin

    2014-05-01

    Full Text Available With the advanced technology used to design VLSI (Very Large Scale Integration circuits, low-power and energy-efficiency have played important roles for hardware and software implementation. Real-time scheduling is one of the fields that has attracted extensive attention to design low-power, embedded/real-time systems. The dynamic voltage scaling (DVS and CPU shut-down are the two most popular techniques used to design the algorithms. In this paper, we firstly review the fundamental advances in the research of energy-efficient, real-time scheduling. Then, a unified framework with a real Intel PXA255 Xscale processor, namely real-energy, is designed, which can be used to measure the real performance of the algorithms. We conduct a case study to evaluate several classical algorithms by using the framework. The energy efficiency and the quantitative difference in their performance, as well as the practical issues found in the implementation of these algorithms are discussed. Our experiments show a gap between the theoretical and real results. Our framework not only gives researchers a tool to evaluate their system designs, but also helps them to bridge this gap in their future works.

  5. System-level power optimization for real-time distributed embedded systems

    Science.gov (United States)

    Luo, Jiong

    Power optimization is one of the crucial design considerations for modern electronic systems. In this thesis, we present several system-level power optimization techniques for real-time distributed embedded systems, based on dynamic voltage scaling, dynamic power management, and management of peak power and variance of the power profile. Dynamic voltage scaling has been widely acknowledged as an important and powerful technique to trade off dynamic power consumption and delay. Efficient dynamic voltage scaling requires effective variable-voltage scheduling mechanisms that can adjust voltages and clock frequencies adaptively based on workloads and timing constraints. For this purpose, we propose static variable-voltage scheduling algorithms utilizing criticalpath driven timing analysis for the case when tasks are assumed to have uniform switching activities, as well as energy-gradient driven slack allocation for a more general scenario. The proposed techniques can achieve closeto-optimal power savings with very low computational complexity, without violating any real-time constraints. We also present algorithms for power-efficient joint scheduling of multi-rate periodic task graphs along with soft aperiodic tasks. The power issue is addressed through both dynamic voltage scaling and power management. Periodic task graphs are scheduled statically. Flexibility is introduced into the static schedule to allow the on-line scheduler to make local changes to PE schedules through resource reclaiming and slack stealing, without interfering with the validity of the global schedule. We provide a unified framework in which the response times of aperiodic tasks and power consumption are dynamically optimized simultaneously. Interconnection network fabrics point to a new generation of power-efficient and scalable interconnection architectures for distributed embedded systems. As the system bandwidth continues to increase, interconnection networks become power/energy limited as

  6. Generation-Side Power Scheduling in a Grid-Connected DC Microgrid

    DEFF Research Database (Denmark)

    Hernández, Adriana Carolina Luna; Aldana, Nelson Leonardo Diaz; Meng, Lexuan

    2015-01-01

    In this paper, a constrained mixed-integer programming model for scheduling the active power supplied by the generation units in storage-based DC microgrids is presented. The optimization problem minimizes operating costs taking into account a two-stage mode operation of the energy storage system...... so that a more accurate model for optimization of the microgrid operation can be obtained. The model is used in a particular grid-connected DC microgrid that includes two renewable energy sources and an energy storage system which supply a critical load. The results of the scheduling process...

  7. New tool for integration of wind power forecasting into power system operation

    DEFF Research Database (Denmark)

    Gubina, Andrej F.; Keane, Andrew; Meibom, Peter

    2009-01-01

    The paper describes the methodology that has been developed for transmission system operators (TSOs) of Republic of Ireland, Eirgrid, and Northern Ireland, SONI the TSO in Northern Ireland, to study the effects of advanced wind power forecasting on optimal short-term power system scheduling....... The resulting schedules take into account the electricity market conditions and feature optimal reserve scheduling. The short-term wind power prediction is provided by the Anemos tool, and the scheduling function, including the reserve optimisation, by the Wilmar tool. The proposed methodology allows...... for evaluation of the impacts that different types of wind energy forecasts (stochastic vs. deterministic vs. perfect) have on the schedules, and how the new incoming information via in-day scheduling impacts the quality of the schedules. Within the methodology, metrics to assess the quality of the schedules...

  8. Multi-agent system for energy resource scheduling of integrated microgrids in a distributed system

    International Nuclear Information System (INIS)

    Logenthiran, T.; Srinivasan, Dipti; Khambadkone, Ashwin M.

    2011-01-01

    This paper proposes a multi-agent system for energy resource scheduling of an islanded power system with distributed resources, which consists of integrated microgrids and lumped loads. Distributed intelligent multi-agent technology is applied to make the power system more reliable, efficient and capable of exploiting and integrating alternative sources of energy. The algorithm behind the proposed energy resource scheduling has three stages. The first stage is to schedule each microgrid individually to satisfy its internal demand. The next stage involves finding the best possible bids for exporting power to the network and compete in a whole sale energy market. The final stage is to reschedule each microgrid individually to satisfy the total demand, which is the addition of internal demand and the demand from the results of the whole sale energy market simulation. The simulation results of a power system with distributed resources comprising three microgrids and five lumped loads show that the proposed multi-agent system allows efficient management of micro-sources with minimum operational cost. The case studies demonstrate that the system is successfully monitored, controlled and operated by means of the developed multi-agent system. (author)

  9. Multi-agent system for energy resource scheduling of integrated microgrids in a distributed system

    Energy Technology Data Exchange (ETDEWEB)

    Logenthiran, T.; Srinivasan, Dipti; Khambadkone, Ashwin M. [Department of Electrical and Computer Engineering, National University of Singapore, 4 Engineering Drive 3, Singapore 117576 (Singapore)

    2011-01-15

    This paper proposes a multi-agent system for energy resource scheduling of an islanded power system with distributed resources, which consists of integrated microgrids and lumped loads. Distributed intelligent multi-agent technology is applied to make the power system more reliable, efficient and capable of exploiting and integrating alternative sources of energy. The algorithm behind the proposed energy resource scheduling has three stages. The first stage is to schedule each microgrid individually to satisfy its internal demand. The next stage involves finding the best possible bids for exporting power to the network and compete in a whole sale energy market. The final stage is to reschedule each microgrid individually to satisfy the total demand, which is the addition of internal demand and the demand from the results of the whole sale energy market simulation. The simulation results of a power system with distributed resources comprising three microgrids and five lumped loads show that the proposed multi-agent system allows efficient management of micro-sources with minimum operational cost. The case studies demonstrate that the system is successfully monitored, controlled and operated by means of the developed multi-agent system. (author)

  10. A bi-level stochastic scheduling optimization model for a virtual power plant connected to a wind–photovoltaic–energy storage system considering the uncertainty and demand response

    International Nuclear Information System (INIS)

    Ju, Liwei; Tan, Zhongfu; Yuan, Jinyun; Tan, Qingkun; Li, Huanhuan; Dong, Fugui

    2016-01-01

    Highlights: • Our research focuses on Virtual Power Plant (VPP). • Virtual Power Plant consists of WPP, PV, CGT, ESSs and DRPs. • Robust optimization theory is introduced to analyze uncertainties. • A bi-level stochastic scheduling optimization model is proposed for VPP. • Models are built to measure the impacts of ESSs and DERPs on VPP operation. - Abstract: To reduce the uncertain influence of wind power and solar photovoltaic power on virtual power plant (VPP) operation, robust optimization theory (ROT) is introduced to build a stochastic scheduling model for VPP considering the uncertainty, price-based demand response (PBDR) and incentive-based demand response (IBDR). First, the VPP components are described including the wind power plant (WPP), photovoltaic generators (PV), convention gas turbine (CGT), energy storage systems (ESSs) and demand resource providers (DRPs). Then, a scenario generation and reduction frame is proposed for analyzing and simulating output stochastics based on the interval method and the Kantorovich distance. Second, a bi-level robust scheduling model is proposed with a double robust coefficient for WPP and PV. In the upper layer model, the maximum VPP operation income is taken as the optimization objective for building the scheduling model with the day-ahead prediction output of WPP and PV. In the lower layer model, the day-ahead scheduling scheme is revised with the actual output of the WPP and PV under the objectives of the minimum system net load and the minimum system operation cost. Finally, the independent micro-grid in a coastal island in eastern China is used for the simulation analysis. The results illustrate that the model can overcome the influence of uncertainty on VPP operations and reduce the system power shortage cost by connecting the day-ahead scheduling with the real-time scheduling. ROT could provide a flexible decision tool for decision makers, effectively addressing system uncertainties. ESSs could

  11. Day-ahead resource scheduling of a renewable energy based virtual power plant

    International Nuclear Information System (INIS)

    Zamani, Ali Ghahgharaee; Zakariazadeh, Alireza; Jadid, Shahram

    2016-01-01

    Highlights: • Simultaneous energy and reserve scheduling of a VPP. • Aggregate uncertainties of electricity prices, renewable generation and load demand. • Develop a stochastic scheduling model using the point estimate method. - Abstract: The evolution of energy markets is accelerating in the direction of a greater reliance upon distributed energy resources (DERs). To manage this increasing two-way complexity, virtual power plants (VPPs) are being deployed today all over the world. In this paper, a probabilistic model for optimal day ahead scheduling of electrical and thermal energy resources in a VPP is proposed where participation of energy storage systems and demand response programs (DRPs) are also taken into account. In the proposed model, energy and reserve is simultaneously scheduled considering the uncertainties of market prices, electrical demand and intermittent renewable power generation. The Point Estimate Method (PEM) is applied in order to model the uncertainties of VPP’s scheduling problem. Moreover, the optimal reserve scheduling of VPP is presented which efficiently decreases VPP’s risk facing the unexpected fluctuations of uncertain parameters at the power delivery time. The results demonstrated that implementation of demand response programs (DRPs) would decrease total operation costs of VPP as well as its dependency on the upstream network.

  12. A fast method for the unit scheduling problem with significant renewable power generation

    International Nuclear Information System (INIS)

    Osório, G.J.; Lujano-Rojas, J.M.; Matias, J.C.O.; Catalão, J.P.S.

    2015-01-01

    Highlights: • A model to the scheduling of power systems with significant renewable power generation is provided. • A new methodology that takes information from the analysis of each scenario separately is proposed. • Based on a probabilistic analysis, unit scheduling and corresponding economic dispatch are estimated. • A comparison with others methodologies is in favour of the proposed approach. - Abstract: Optimal operation of power systems with high integration of renewable power sources has become difficult as a consequence of the random nature of some sources like wind energy and photovoltaic energy. Nowadays, this problem is solved using Monte Carlo Simulation (MCS) approach, which allows considering important statistical characteristics of wind and solar power production such as the correlation between consecutive observations, the diurnal profile of the forecasted power production, and the forecasting error. However, MCS method requires the analysis of a representative amount of trials, which is an intensive calculation task that increases considerably with the number of scenarios considered. In this paper, a model to the scheduling of power systems with significant renewable power generation based on scenario generation/reduction method, which establishes a proportional relationship between the number of scenarios and the computational time required to analyse them, is proposed. The methodology takes information from the analysis of each scenario separately to determine the probabilistic behaviour of each generator at each hour in the scheduling problem. Then, considering a determined significance level, the units to be committed are selected and the load dispatch is determined. The proposed technique was illustrated through a case study and the comparison with stochastic programming approach was carried out, concluding that the proposed methodology can provide an acceptable solution in a reduced computational time

  13. Power generation scheduling. A free market based procedure with reserve constraints included

    International Nuclear Information System (INIS)

    Huse, Einar Staale

    1998-01-01

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs

  14. Power generation scheduling. A free market based procedure with reserve constraints included

    Energy Technology Data Exchange (ETDEWEB)

    Huse, Einar Staale

    1999-12-31

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs.

  15. Power generation scheduling. A free market based procedure with reserve constraints included

    Energy Technology Data Exchange (ETDEWEB)

    Huse, Einar Staale

    1998-12-31

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs.

  16. A Hierarchical Algorithm for Integrated Scheduling and Control With Applications to Power Systems

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil; Dinesen, Peter Juhler; Jørgensen, John Bagterp

    2016-01-01

    The contribution of this paper is a hierarchical algorithm for integrated scheduling and control via model predictive control of hybrid systems. The controlled system is a linear system composed of continuous control, state, and output variables. Binary variables occur as scheduling decisions in ...

  17. Nuclear power plant maintenance scheduling dilemma: a genetic algorithm approach

    International Nuclear Information System (INIS)

    Mahdavi, M.H.; Modarres, M.

    2004-01-01

    There are huge numbers of components scheduled for maintenance when a nuclear power plant is shut down. Among these components, a number of them are safety related which their operability as well as reliability when plant becomes up is main concerns. Not performing proper maintenance on this class of components/system would impose substantial risk on operating the NPP. In this paper a new approach based on genetic algorithms is presented to optimize the NPP maintenance schedule during shutdown. following this approach the cost incurred by maintenance activities for each schedule is balanced with the risk imposed by the maintenance scheduling plan to the plant operation status when it is up. The risk model implemented in the GA scheduler as its evaluation function is developed on the basis of the probabilistic risk assessment methodology. the Ga optimizers itself is shown to be superior compared to other optimization methods such as the monte carlo technique

  18. Analysis of Application Power and Schedule Composition in a High Performance Computing Environment

    Energy Technology Data Exchange (ETDEWEB)

    Elmore, Ryan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gruchalla, Kenny [National Renewable Energy Lab. (NREL), Golden, CO (United States); Phillips, Caleb [National Renewable Energy Lab. (NREL), Golden, CO (United States); Purkayastha, Avi [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wunder, Nick [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-01-05

    As the capacity of high performance computing (HPC) systems continues to grow, small changes in energy management have the potential to produce significant energy savings. In this paper, we employ an extensive informatics system for aggregating and analyzing real-time performance and power use data to evaluate energy footprints of jobs running in an HPC data center. We look at the effects of algorithmic choices for a given job on the resulting energy footprints, and analyze application-specific power consumption, and summarize average power use in the aggregate. All of these views reveal meaningful power variance between classes of applications as well as chosen methods for a given job. Using these data, we discuss energy-aware cost-saving strategies based on reordering the HPC job schedule. Using historical job and power data, we present a hypothetical job schedule reordering that: (1) reduces the facility's peak power draw and (2) manages power in conjunction with a large-scale photovoltaic array. Lastly, we leverage this data to understand the practical limits on predicting key power use metrics at the time of submission.

  19. Power/performance trade-offs in real-time SDRAM command scheduling

    OpenAIRE

    Goossens, S.L.M.; Chandrasekar, K.; Akesson, K.B.; Goossens, K.G.W.

    2016-01-01

    Real-time safety-critical systems should provide hard bounds on an applications’ performance. SDRAM controllers used in this domain should therefore have a bounded worst-case bandwidth, response time, and power consumption. Existing works on real-time SDRAM controllers only consider a narrow range of memory devices, and do not evaluate how their schedulers’ performance varies across memory generations, nor how the scheduling algorithm influences power usage. The extent to which the number of ...

  20. Optimal scheduling of biocide dosing for seawater-cooled power and desalination plants

    KAUST Repository

    Mahfouz, Abdullah Bin

    2011-02-13

    Thermal desalination systems are typically integrated with power plants to exploit the excess heat resulting from the power-generation units. Using seawater in cooling the power plant and the desalination system is a common practice in many parts of the world where there is a shortage of freshwater. Biofouling is one of the major problems associated with the usage of seawater in cooling systems. Because of the dynamic variation in the power and water demands as well as the changes in the characteristics of seawater and the process, there is a need to develop an optimal policy for scheduling biocide usage and cleaning maintenance of the heat exchangers. The objective of this article is to introduce a systematic procedure for the optimization of scheduling the dosing of biocide and dechlorination chemicals as well as cleaning maintenance for a power production/thermal desalination plant. A multi-period optimization formulation is developed and solved to determine: the optimal levels of dosing and dechlorination chemicals; the timing of maintenance to clean the heat-exchange surfaces; and the dynamic dependence of the biofilm growth on the applied doses, the seawater-biocide chemistry, the process conditions, and seawater characteristics for each time period. The technical, economic, and environmental considerations of the system are accounted for. A case study is solved to elucidate the applicability of the developed optimization approach. © 2011 Springer-Verlag.

  1. Stochastic profit-based scheduling of industrial virtual power plant using the best demand response strategy

    International Nuclear Information System (INIS)

    Nosratabadi, Seyyed Mostafa; Hooshmand, Rahmat-Allah; Gholipour, Eskandar

    2016-01-01

    Highlights: • VPPs and IVPPs are defined for energy management of aggregated generations. • IVPP can manage industrial microgrid containing some relevant load and generation. • A stochastic modeling is proposed to schedule optimal generations in competition market. • Wind generation and day-ahead and spot market prices are considered to be stochastic. • A new DRL program selection scheme is presented in the scheduling procedure. - Abstract: One of the main classified microgrids in a power system is the industrial microgrid. Due to its behaviors and the heavy loads, its energy management is challengeable. Virtual Power Plant (VPP) can be an important concept in managing such problems in this kind of grids. Here, a transmission power system is considered as a Regional Electric Company (REC) and the VPPs comprising Distributed Generation (DG) units and Demand Response Loads (DRLs) are determined in this system. This paper focuses on Industrial VPP (IVPP) and its management. An IVPP can be determined as a management unit comprising generations and loads in an industrial microgrid. Since the scheduling procedure for these units is very important for their participation in a short-term electric market, a stochastic formulation is proposed for power scheduling in VPPs especially in IVPPs in this paper. By introducing the DRL programs and using the proposed modeling, the operator can select the best DRL program for each VPP in a scheduling procedure. In this regard, a suitable approach is presented to determine the proposed formulation and its solution in a Mixed Integer Non-Linear Programming (MINLP). To validate the performance of the proposed method, the IEEE Reliability Test System (IEEE-RTS) is considered to apply the method on it, while some challenging aspects are presented.

  2. Coordinated Scheduling and Power Control in Cloud-Radio Access Networks

    KAUST Repository

    Douik, Ahmed

    2015-12-01

    This paper addresses the joint coordinated scheduling and power control problem in cloud-enabled networks. Consider the downlink of a cloud-radio access network (CRAN), where the cloud is only responsible for the scheduling policy, power control, and synchronization of the transmit frames across the single-antenna base-stations (BS). The transmit frame consists of several time/frequency blocks, called power-zones (PZ). The paper considers the problem of scheduling users to PZs and determining their power levels (PL), by maximizing the weighted sum-rate under the practical constraints that each user cannot be served by more than one base-station, but can be served by one or more power-zones within each base-station frame. The paper solves the problem using a graph theoretical approach by introducing the joint scheduling and power control graph formed by several clusters, where each is formed by a set of vertices, representing the possible association of users, BSs, and PLs for one specific PZ. The problem is, then, formulated as a maximumweight clique problem, in which the weight of each vertex is the sum of the benefits of the individual associations belonging to that vertex. Simulation results suggest that the proposed crosslayer scheme provides appreciable performance improvement as compared to schemes from recent literature.

  3. Coordinated Scheduling and Power Control in Cloud-Radio Access Networks

    KAUST Repository

    Douik, Ahmed; Dahrouj, Hayssam; Al-Naffouri, Tareq Y.; Alouini, Mohamed-Slim

    2015-01-01

    This paper addresses the joint coordinated scheduling and power control problem in cloud-enabled networks. Consider the downlink of a cloud-radio access network (CRAN), where the cloud is only responsible for the scheduling policy, power control, and synchronization of the transmit frames across the single-antenna base-stations (BS). The transmit frame consists of several time/frequency blocks, called power-zones (PZ). The paper considers the problem of scheduling users to PZs and determining their power levels (PL), by maximizing the weighted sum-rate under the practical constraints that each user cannot be served by more than one base-station, but can be served by one or more power-zones within each base-station frame. The paper solves the problem using a graph theoretical approach by introducing the joint scheduling and power control graph formed by several clusters, where each is formed by a set of vertices, representing the possible association of users, BSs, and PLs for one specific PZ. The problem is, then, formulated as a maximumweight clique problem, in which the weight of each vertex is the sum of the benefits of the individual associations belonging to that vertex. Simulation results suggest that the proposed crosslayer scheme provides appreciable performance improvement as compared to schemes from recent literature.

  4. Distributed continuous energy scheduling for dynamic virtual power plants

    International Nuclear Information System (INIS)

    Niesse, Astrid

    2015-01-01

    This thesis presents DynaSCOPE as distributed control method for continuous energy scheduling for dynamic virtual power plants (DVPP). DVPPs aggregate the flexibility of distributed energy units to address current energy markets. As an extension of the Virtual Power Plant concept they show high dynamics in aggregation and operation of energy units. Whereas operation schedules are set up for all energy units in a day-ahead planning procedure, incidents may render these schedules infeasible during execution, like deviation from prognoses or outages. Thus, a continuous scheduling process is needed to ensure product fulfillment. With DynaSCOPE, software agents representing single energy units solve this problem in a completely distributed heuristic approach. Using a stepped concept, several damping mechanisms are applied to allow minimum disturbance while continuously trying to fulfill the product as contracted at the market.

  5. Knowledge-based systems for power management

    Science.gov (United States)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  6. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  7. Power Constrained High-Level Synthesis of Battery Powered Digital Systems

    DEFF Research Database (Denmark)

    Nielsen, Sune Fallgaard; Madsen, Jan

    2003-01-01

    We present a high-level synthesis algorithm solving the combined scheduling, allocation and binding problem minimizing area under both latency and maximum power per clock-cycle constraints. Our approach eliminates the large power spikes, resulting in an increased battery lifetime, a property...... of utmost importance for battery powered embedded systems. Our approach extends the partial-clique partitioning algorithm by introducing power awareness through a heuristic algorithm which bounds the design space to those of power feasible schedules. We have applied our algorithm on a set of dataflow graphs...

  8. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  9. Packet-Scheduling Algorithm by the Ratio of Transmit Power to the Transmission Bits in 3GPP LTE Downlink

    Directory of Open Access Journals (Sweden)

    Gil Gye-Tae

    2010-01-01

    Full Text Available Packet scheduler plays the central role in determining the overall performance of the 3GPP long-term evolution (LTE based on packet-switching operation. In this paper, a novel minimum transmit power-based (MP packet-scheduling algorithm is proposed that can achieve power-efficient transmission to the UEs while providing both system throughput gain and fairness improvement. The proposed algorithm is based on a new scheduling metric focusing on the ratio of the transmit power per bit and allocates the physical resource block (PRB to the UE that requires the least ratio of the transmit power per bit. Through computer simulation, the performance of the proposed MP packet-scheduling algorithm is compared with the conventional packet-scheduling algorithms by two primary criteria: fairness and throughput. The simulation results show that the proposed algorithm outperforms the conventional algorithms in terms of the fairness and throughput.

  10. Scheduling of power generation a large-scale mixed-variable model

    CERN Document Server

    Prékopa, András; Strazicky, Beáta; Deák, István; Hoffer, János; Németh, Ágoston; Potecz, Béla

    2014-01-01

    The book contains description of a real life application of modern mathematical optimization tools in an important problem solution for power networks. The objective is the modelling and calculation of optimal daily scheduling of power generation, by thermal power plants,  to satisfy all demands at minimum cost, in such a way that the  generation and transmission capacities as well as the demands at the nodes of the system appear in an integrated form. The physical parameters of the network are also taken into account. The obtained large-scale mixed variable problem is relaxed in a smart, practical way, to allow for fast numerical solution of the problem.

  11. An energy management system for off-grid power systems

    Energy Technology Data Exchange (ETDEWEB)

    Zelazo, Daniel [Universitaet Stuttgart, Institute for Systems Theory and Automatic Control, Stuttgart (Germany); Dai, Ran; Mesbahi, Mehran [University of Washington, Department of Aeronautics and Astronautics, Seattle, WA (United States)

    2012-06-15

    Next generation power management at all scales will rely on the efficient scheduling and operation of both generating units and loads to maximize efficiency and utility. The ability to schedule and modulate the demand levels of a subset of loads within a power system can lead to more efficient use of the generating units. These methods become increasingly important for systems that operate independently of the main utility, such as microgrid and off-grid systems. This work extends the principles of unit commitment and economic dispatch problems to off-grid power systems where the loads are also schedulable. We propose a general optimization framework for solving the energy management problem in these systems. An important contribution is the description of how a wide range of sources and loads, including those with discrete states, non-convex, and nonlinear cost or utility functions, can be reformulated as a convex optimization problem using, for example, a shortest path description. Once cast in this way, solution are obtainable using a sub-gradient algorithm that also lends itself to a distributed implementation. The methods are demonstrated by a simulation of an off-grid solar powered community. (orig.)

  12. MANAGING THE LOAD SCHEDULE OF THE ADMINISTRATIVE BUILDING TAKING INTO ACCOUNT EMERGING RISKS WHEN CONNECTING THE KINETIC ENERGY STORAGE TO THE POWER SUPPLY SYSTEM

    Directory of Open Access Journals (Sweden)

    S. Yu. Shevchenko

    2017-12-01

    Full Text Available Purpose. The purpose of the paper is to analyze load schedules of the administrative building and develop a structural scheme for connecting the kinetic energy storage in the power supply system of this building, which will allow using it as a consumer regulator, as well as a theoretical study of the risks that arise. Methodology. To conduct the research, the theory of designing internal electrical networks of buildings, the theory of plotting electric load graphs, methods of the theory of electromechanical systems and for analyzing the risk system, the T. Saati method of hierarchies were used. Results. The structure of kinetic energy storage (KES connection to the power supply system of the administrative building is developed and the structural diagram of the KES proposed for installation is given, the average daily winter and summer load schedules are presented, a set of groups and subgroups of risks and their influence on the work of the power supply system of the building are connected with the connection of the KES. Originality. For the first time, the application of the kinetic energy storage in the power supply system of the building with the analysis of emerging risks is considered, which makes it possible to improve the reliability of the developed system and the efficiency of load regulation. Practical value. The application of the proposed scheme will make it possible to use administrative buildings as load regulators of the external power supply system, and also effectively manage the load in the internal power supply system of the building.

  13. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    International Nuclear Information System (INIS)

    Kim, Woojoong; Ryu, Dongsoo; Jung, Youngsoo

    2014-01-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation

  14. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woojoong, E-mail: minidung@nate.com [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Ryu, Dongsoo, E-mail: energyboy@khnp.co.kr [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Jung, Youngsoo, E-mail: yjung97@mju.ac.kr [College of Architecture, Myongji University, Yongin 449-728 (Korea, Republic of)

    2014-04-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation.

  15. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  16. Abstract flexibility description for virtual power plant scheduling

    OpenAIRE

    Fröhling, Judith

    2017-01-01

    In the ongoing paradigm shift of the energy market from big power plants to more and more small and decentralized power plants, virtual power plants (VPPs) play an important role. VPPs bundle the capacities of the small and decentralized resources (DER). Planing of VPP operation, that is also called scheduling, relies on the flexibilities of controllable DER in the VPP, e.g., combined heat and power plants (CHPs), heat pumps and batteries. The aim of this thesis is the development of an abstr...

  17. Dynamic Appliances Scheduling in Collaborative MicroGrids System

    Science.gov (United States)

    Bilil, Hasnae; Aniba, Ghassane; Gharavi, Hamid

    2017-01-01

    In this paper a new approach which is based on a collaborative system of MicroGrids (MG’s), is proposed to enable household appliance scheduling. To achieve this, appliances are categorized into flexible and non-flexible Deferrable Loads (DL’s), according to their electrical components. We propose a dynamic scheduling algorithm where users can systematically manage the operation of their electric appliances. The main challenge is to develop a flattening function calculus (reshaping) for both flexible and non-flexible DL’s. In addition, implementation of the proposed algorithm would require dynamically analyzing two successive multi-objective optimization (MOO) problems. The first targets the activation schedule of non-flexible DL’s and the second deals with the power profiles of flexible DL’s. The MOO problems are resolved by using a fast and elitist multi-objective genetic algorithm (NSGA-II). Finally, in order to show the efficiency of the proposed approach, a case study of a collaborative system that consists of 40 MG’s registered in the load curve for the flattening program has been developed. The results verify that the load curve can indeed become very flat by applying the proposed scheduling approach. PMID:28824226

  18. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  19. Automatic scheduling of maintenance work in nuclear power plants

    International Nuclear Information System (INIS)

    Kasahara, T.; Nishizawa, Y.; Kato, K.; Kiguchi, T.

    1987-01-01

    An automatic scheduling method for maintenance work in nuclear power plants has been developed using an AI technique. The purpose of this method is to help plant operators by adjusting the time schedule of various kinds of maintenance work so that incorrect ordering or timing of plant manipulations does not cause undersirable results, such as a plant trip. The functions of the method were tested by off-line simulations. The results show that the method can produce a satisfactory schedule of plant component manipulations without interference between the tasks and plant conditions

  20. Oil drilling rig diesel power-plant fuel efficiency improvement potentials through rule-based generator scheduling and utilization of battery energy storage system

    International Nuclear Information System (INIS)

    Pavković, Danijel; Sedić, Almir; Guzović, Zvonimir

    2016-01-01

    Highlights: • Isolated oil drilling rig microgrid power flows are analyzed over 30 days. • Rule-based diesel generator scheduling is proposed to reduce fuel consumption. • A battery energy storage is parameterized and used for peak load leveling. • The effectiveness of proposed hybrid microgrid is verified by simulations. • Return-of-investment might be expected within 20% of battery system lifetime. - Abstract: This paper presents the development of a rule-based energy management control strategy suitable for isolated diesel power-plants equipped with a battery energy storage system for peak load shaving. The proposed control strategy includes the generator scheduling strategy and peak load leveling scheme based on current microgrid active and reactive power requirements. In order to investigate the potentials for fuel expenditure reduction, 30 days-worth of microgrid power flow data has been collected on an isolated land-based oil drilling rig powered by a diesel generator power-plant, characterized by highly-variable active and reactive load profiles due to intermittent engagements and disengagements of high-power electric machinery such as top-drive, draw-works and mud-pump motors. The analysis has indicated that by avoiding the low-power operation of individual generators and by providing the peak power requirements (peak shaving) from a dedicated energy storage system, the power-plant fuel efficiency may be notably improved. An averaged power flow simulation model has been built, comprising the proposed rule-based power flow control strategy and the averaged model of a suitably sized battery energy storage system equipped with grid-tied power converter and state-of-charge control system. The effectiveness of the proposed rule-based strategy has been evaluated by means of computer simulation analysis based on drilling rig microgrid active and reactive power data recorded during the 30 day period. The analysis has indicated that fuel consumption of

  1. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  2. An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost

    International Nuclear Information System (INIS)

    Yuan, Xiaohui; Tian, Hao; Yuan, Yanbin; Huang, Yuehua; Ikram, Rana M.

    2015-01-01

    Highlights: • Multi-objective hydro-thermal-wind scheduling model (MO-HTWS) is establish. • The extra cost in MO-HTWS problem caused by wind uncertainty is considered. • An extended NSGA-III is proposed to solve MO-HTWS problem. • Constraint handling strategies are presented to modify infeasible solutions. • The feasibility and effectiveness of the proposed method is verified by example. - Abstract: Due to the characteristics of clean and renewable, wind power is significant to economic and environmental operation of electric power system so that it attracts more and more attention from researchers. This paper integrates wind power with hydrothermal scheduling to establish multi-objective economic emission hydro-thermal-wind scheduling problem (MO-HTWS) model with considering wind uncertain cost. To solve MO-HTWS problem with various complicated constraints, this paper extends NSGA-III by introducing the dominance relationship criterion based on constraint violation to select new generation. Moreover, the constraint handling strategy which repairs the infeasible solutions by modifying the decision variables in feasible zone according to the violation amount is proposed. Finally, a daily scheduling example of hydro-thermal-wind system is used to test the ability of NSGA-III for solving MO-HTWS problem. It is concluded from the superior quality and good distribution of the Pareto optimal solutions that, NSGA-III can offer an efficient alternative for optimizing MO-HTWS problem

  3. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  4. Power scheduling in islanded-mode microgrids using fuel cell vehicles

    NARCIS (Netherlands)

    Alavi, Farid; Van De Wouw, Nathan; De Schutter, Bart

    2018-01-01

    We consider power scheduling in a microgrid operated in the islanded mode. It is assumed that at any time all the renewable energy sources are generating the maximum achievable electrical power based on the weather conditions and the power balance of the microgrid is exclusively done by a fleet of

  5. Analysis of critical paths for schedule control of nuclear power projects

    International Nuclear Information System (INIS)

    Shi Liangmin; Ma Limin; Fan Kai

    2005-01-01

    Study on the critical paths for the schedule control of nuclear power projects has been performed for reactor M310, based on the experiences from Daya Bay project and Ling Ao project. The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test. For NI civil work, the critical path is the main civil work of the reactor building, pre-stressing, handover of rooms for important areas, and key CW-erection interfaces; there are four critical paths for NI erection; For startup, two stages can be identified: commissioning of 16 single systems directly serving the CFT and joint-test. (authors)

  6. Multi-objective stochastic scheduling optimization model for connecting a virtual power plant to wind-photovoltaic-electric vehicles considering uncertainties and demand response

    International Nuclear Information System (INIS)

    Ju, Liwei; Li, Huanhuan; Zhao, Junwei; Chen, Kangting; Tan, Qingkun; Tan, Zhongfu

    2016-01-01

    Highlights: • Our research focuses on virtual power plant. • Electric vehicle group and demand response are integrated into virtual power plant. • Stochastic chance constraint planning is applied to overcome uncertainties. • A multi-objective stochastic scheduling model is proposed for virtual power plant. • A three-stage hybrid intelligent solution algorithm is proposed for solving the model. - Abstract: A stochastic chance-constrained planning method is applied to build a multi-objective optimization model for virtual power plant scheduling. Firstly, the implementation cost of demand response is calculated using the system income difference. Secondly, a wind power plant, photovoltaic power, an electric vehicle group and a conventional power plant are aggregated into a virtual power plant. A stochastic scheduling model is proposed for the virtual power plant, considering uncertainties under three objective functions. Thirdly, a three-stage hybrid intelligent solution algorithm is proposed, featuring the particle swarm optimization algorithm, the entropy weight method and the fuzzy satisfaction theory. Finally, the Yunnan distributed power demonstration project in China is utilized for example analysis. Simulation results demonstrate that when considering uncertainties, the system will reduce the grid connection of the wind power plant and photovoltaic power to decrease the power shortage punishment cost. The average reduction of the system power shortage punishment cost and the operation revenue of virtual power plant are 61.5% and 1.76%, respectively, while the average increase of the system abandoned energy cost is 40.4%. The output of the virtual power plant exhibits a reverse distribution with the confidence degree of the uncertainty variable. The proposed algorithm rapidly calculates a global optimal set. The electric vehicle group could provide spinning reserve to ensure stability of the output of the virtual power plant. Demand response could

  7. A new self-scheduling strategy for integrated operation of wind and pumped-storage power plants in power markets

    International Nuclear Information System (INIS)

    Varkani, Ali Karimi; Daraeepour, Ali; Monsef, Hassan

    2011-01-01

    Highlights: → A strategy for integrated operation of wind and pumped-storage plants is proposed. → Participation of both plants in energy and ancillary service markets is modeled. → The uncertainty of wind production is modeled by a novel probabilistic function. → The proposed strategy is tested on a real case in the Spanish electricity market. -- Abstract: Competitive structure of power markets causes various challenges for wind resources to participate in these markets. Indeed, production uncertainty is the main cause of their low income. Thus, they are usually supported by system operators, which is in contrast with the competitive paradigm of power markets. In this paper, a new strategy for increasing the profits of wind resources is proposed. In the suggested strategy, a Generation Company (GenCo), who owns both wind and pumped-storage plants, self-schedules the integrated operation of them regarding the uncertainty of wind power generation. For presenting an integrated self-schedule and obtaining a real added value of the strategy, participation of the GenCo in energy and ancillary service markets is modeled. The self-scheduling strategy is based on stochastic programming techniques. Outputs of the problem include generation offers in day-ahead energy market and ancillary service markets, including spinning and regulation reserve markets. A Neural Network (NN) based technique is used for modeling the uncertainty of wind power production. The proposed strategy is tested on a real wind farm in mainland, Spain. Moreover, added value of the strategy is presented in different conditions of the market.

  8. Planning and Resource Management in an Intelligent Automated Power Management System

    Science.gov (United States)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  9. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  10. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  11. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  12. Optimal distribution of reactivity excess in a system of reactors operating at a variable loading schedule

    International Nuclear Information System (INIS)

    Bolsunov, A.A.; Zagrebaev, A.M.; Naumov, V.I.

    1979-01-01

    Considered is the task of reactivity excess distribution optimization in the system of reactors for the purpose of minimazing the summary power production losses at the fixed loading schedule. Mathematical formulation of the task is presented. Given are the curves, characterizing the dependence of possible degree of the reactor power drop on reactivity excees for non-stationary Xe poisoning at different nominal density of neutron flux. Analyzing the results, it is concluded that in case, when the reactors differ only in neutron flux density the reactor with lower neutron flux density should be involved in the variable operation schedule first as the poisoning of this reactor will be less, and therefore, the losses of the system power production will be less. It is advisable to reserve the reactivity excess in the reactor with greater power or in the reactor with higher burnup rate. It is stressed that the obtained results of the optimization task solution point out the possibility of obtaining the certain ecomonic effect and permit to correct the requirements on mobility of separate power units at system approach to NPP operation in a variable loading schedule

  13. Scheduling the maintenance of gaseous diffusion and electric power distribution plants

    International Nuclear Information System (INIS)

    Chauvet, D.

    1990-01-01

    A computer aided scheduling applied to the maintenance of a uranium enrichment plant is presented. The plant exploits gaseous diffusion and electric power distribution plants, for which the operating conditions must be satisfied. The management and the execution of the maintenance actions are computer aided. Concerning the techniques, the cost, the safety and the scheduling actions were optimized [fr

  14. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  15. Robust optimization for load scheduling of a smart home with photovoltaic system

    International Nuclear Information System (INIS)

    Wang, Chengshan; Zhou, Yue; Jiao, Bingqi; Wang, Yamin; Liu, Wenjian; Wang, Dan

    2015-01-01

    Highlights: • Robust household load scheduling is presented for smart homes with PV system. • A robust counterpart is formulated to deal with PV output uncertainty. • The robust counterpart is finally transformed to a quadratic programming problem. • Load schedules with different robustness can be made by the proposed method. • Feed-in tariff and PV output would affect the significance of the proposed method. - Abstract: In this paper, a robust approach is developed to tackle the uncertainty of PV power output for load scheduling of smart homes integrated with household PV system. Specifically, a robust formulation is proposed and further transformed to an equivalent quadratic programming problem. Day-ahead load schedules with different robustness can be generated by solving the proposed robust formulation with different predefined parameters. The validity and advantage of the proposed approach has been verified by simulation results. Also, the effects of feed-in tariff and PV output have been evaluated

  16. A Systematical Framework of Schedule Risk Management for Power Grid Engineering Projects’ Sustainable Development

    Directory of Open Access Journals (Sweden)

    Rao Rao

    2014-10-01

    Full Text Available Schedule risks are the main threat for high efficiency of schedule management in power grid engineering projects (PGEP. This paper aims to build a systematical framework for schedule risk management, which consists of three dimensions, including the personnel dimension, method dimension and time dimension, namely supervisory personnel, management methods and the construction process, respectively. Responsibilities of staff with varied functions are discussed in the supervisory personnel part, and six stages and their corresponding 40 key works are ensured as the time dimension. Risk identification, analysis, evaluation and prevention together formed the method dimension. Based on this framework, 222 schedule risks occur in the whole process of PGEPs are identified via questionnaires and expert interviews. Then, the relationship among each risk is figured out based on the Interpretative Structure Model (ISM method and the impact of each risk is quantitatively assessed by establishing evaluation system. The actual practice of the proposed framework is verified through the analysis of the first stage of a PGEP. Finally, the results show that this framework of schedule risk management is meaningful for improving the efficiency of project management. It provides managers with a clearer procedure with which to conduct risk management, helps them to timely detect risks and prevent risks from occurring. It is also easy for managers to judge the influence level of each risk, so they can take actions based on the level of each risk’s severity. Overall, it is beneficial for power grid enterprises to achieve a sustainable management.

  17. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  18. An Adaptive Power Efficient Packet Scheduling Algorithm for Wimax Networks

    OpenAIRE

    R Murali Prasad; P. Satish Kumar

    2010-01-01

    Admission control schemes and scheduling algorithms are designed to offer QoS services in 802.16/802.16e networks and a number of studies have investigated these issues. But the channel condition and priority of traffic classes are very rarely considered in the existing scheduling algorithms. Although a number of energy saving mechanisms have been proposed for the IEEE 802.16e, to minimize the power consumption of IEEE 802.16e mobile stations with multiple real-time connections has not yet be...

  19. Low-Complexity Scheduling and Power Adaptation for Coordinated Cloud-Radio Access Networks

    KAUST Repository

    Douik, Ahmed

    2017-07-17

    In practical wireless systems, the successful implementation of resource allocation techniques strongly depends on the algorithmic complexity. Consider a cloud-radio access network (CRAN), where the central cloud is responsible for scheduling devices to the frames’ radio resources blocks (RRBs) of the single-antenna base-stations (BSs), adjusting the transmit power levels, and for synchronizing the transmit frames across the connected BSs. Previous studies show that the jointly coordinated scheduling and power control problem in the considered CRAN can be solved using an approach that scales exponentially with the number of BSs, devices, and RRBs, which makes the practical implementation infeasible for reasonably sized networks. This paper instead proposes a low-complexity solution to the problem, under the constraints that each device cannot be served by more than one BS but can be served by multiple RRBs within each BS frame, and under the practical assumption that the channel is constant during the duration of each frame. The paper utilizes graph-theoretical based techniques and shows that constructing a single power control graph is sufficient to obtain the optimal solution with a complexity that is independent of the number of RRBs. Simulation results reveal the optimality of the proposed solution for slow-varying channels, and show that the solution performs near-optimal for highly correlated channels.

  20. A Statistical Model for Uplink Intercell Interference with Power Adaptation and Greedy Scheduling

    KAUST Repository

    Tabassum, Hina

    2012-10-03

    This paper deals with the statistical modeling of uplink inter-cell interference (ICI) considering greedy scheduling with power adaptation based on channel conditions. The derived model is implicitly generalized for any kind of shadowing and fading environments. More precisely, we develop a generic model for the distribution of ICI based on the locations of the allocated users and their transmit powers. The derived model is utilized to evaluate important network performance metrics such as ergodic capacity, average fairness and average power preservation numerically. Monte-Carlo simulation details are included to support the analysis and show the accuracy of the derived expressions. In parallel to the literature, we show that greedy scheduling with power adaptation reduces the ICI, average power consumption of users, and enhances the average fairness among users, compared to the case without power adaptation. © 2012 IEEE.

  1. A Statistical Model for Uplink Intercell Interference with Power Adaptation and Greedy Scheduling

    KAUST Repository

    Tabassum, Hina; Yilmaz, Ferkan; Dawy, Zaher; Alouini, Mohamed-Slim

    2012-01-01

    This paper deals with the statistical modeling of uplink inter-cell interference (ICI) considering greedy scheduling with power adaptation based on channel conditions. The derived model is implicitly generalized for any kind of shadowing and fading environments. More precisely, we develop a generic model for the distribution of ICI based on the locations of the allocated users and their transmit powers. The derived model is utilized to evaluate important network performance metrics such as ergodic capacity, average fairness and average power preservation numerically. Monte-Carlo simulation details are included to support the analysis and show the accuracy of the derived expressions. In parallel to the literature, we show that greedy scheduling with power adaptation reduces the ICI, average power consumption of users, and enhances the average fairness among users, compared to the case without power adaptation. © 2012 IEEE.

  2. Joint Scheduling Optimization of Virtual Power Plants and Equitable Profit Distribution Using Shapely Value Theory

    Directory of Open Access Journals (Sweden)

    Zhong-fu Tan

    2018-01-01

    Full Text Available The installation capacity of wind and solar photovoltaic power is continually increasing, which makes renewable energy grid connection and power generation an important link of China’s power structure optimization. A virtual power plant (VPP is an important way to help distributed energy resource grid connection and promote renewable energy industry development. To study the economic scheduling problem of various distributed energy resources and the profit distribution problem of VPP alliance, this study builds a separate operation scheduling model for individual VPP and a joint operation scheduling model for VPP alliance, as well as the profit distribution model. The case study verifies the feasibility and effectiveness of the proposed model. The sensitivity analysis provides information about VPP decision-making in accordance with the policy environment development trend.

  3. Autonomous power expert fault diagnostic system for Space Station Freedom electrical power system testbed

    Science.gov (United States)

    Truong, Long V.; Walters, Jerry L.; Roth, Mary Ellen; Quinn, Todd M.; Krawczonek, Walter M.

    1990-01-01

    The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control to the Space Station Freedom Electrical Power System (SSF/EPS) testbed being developed and demonstrated at NASA Lewis Research Center. The objectives of the program are to establish artificial intelligence technology paths, to craft knowledge-based tools with advanced human-operator interfaces for power systems, and to interface and integrate knowledge-based systems with conventional controllers. The Autonomous Power EXpert (APEX) portion of the APS program will integrate a knowledge-based fault diagnostic system and a power resource planner-scheduler. Then APEX will interface on-line with the SSF/EPS testbed and its Power Management Controller (PMC). The key tasks include establishing knowledge bases for system diagnostics, fault detection and isolation analysis, on-line information accessing through PMC, enhanced data management, and multiple-level, object-oriented operator displays. The first prototype of the diagnostic expert system for fault detection and isolation has been developed. The knowledge bases and the rule-based model that were developed for the Power Distribution Control Unit subsystem of the SSF/EPS testbed are described. A corresponding troubleshooting technique is also described.

  4. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  5. POWER SUPPLY MANAGEMENT SYSTEM DESIGN ON NODE EARLY WARNING SYSTEM FOR PEATLANDS FIRE MITIGATION

    Directory of Open Access Journals (Sweden)

    Taufiq Muammar

    2018-02-01

    Full Text Available Early warning system is one of the technology to detect land fires by utilizing a network of wireless sensors. Constant data transmission by the sensor nodes consumes a large amount of energy on the nodes’ sides that could affect the battery’s longevity. This research is done to discover the amount of power consumption and battery longevity during fire emergencies, and during non-emergency situation on peatlands. Power saving on the fire detecting system uses an LM35 temperature sensor, ATmega8 micro-controller and HC-12 transmission module. The overall result of powered by a 9 volt battery during fire emergencies, and during non-emergency, the power consumption reaches up to 1 Wh, with various longevity levels of the battery. The implementation of sleep/wake up mode scheduling during fire emergencies and non-emergencies could save battery for 2 hours compared to those without the power saving mode implementation. Power saving during fire emergency could be minimalized by activating the sleep mode activation power-down on the micro controller and it can also set the data transmission schedule to minimalize data usage during fire emergency, so that the usage of sleep/wake up mode interval scheduling during transmission could minimalize energy consumption and elongate the power supply active period.

  6. Space-time wind speed forecasting for improved power system dispatch

    KAUST Repository

    Zhu, Xinxin

    2014-02-27

    To support large-scale integration of wind power into electric energy systems, state-of-the-art wind speed forecasting methods should be able to provide accurate and adequate information to enable efficient, reliable, and cost-effective scheduling of wind power. Here, we incorporate space-time wind forecasts into electric power system scheduling. First, we propose a modified regime-switching, space-time wind speed forecasting model that allows the forecast regimes to vary with the dominant wind direction and with the seasons, hence avoiding a subjective choice of regimes. Then, results from the wind forecasts are incorporated into a power system economic dispatch model, the cost of which is used as a loss measure of the quality of the forecast models. This, in turn, leads to cost-effective scheduling of system-wide wind generation. Potential economic benefits arise from the system-wide generation of cost savings and from the ancillary service cost savings. We illustrate the economic benefits using a test system in the northwest region of the United States. Compared with persistence and autoregressive models, our model suggests that cost savings from integration of wind power could be on the scale of tens of millions of dollars annually in regions with high wind penetration, such as Texas and the Pacific northwest. © 2014 Sociedad de Estadística e Investigación Operativa.

  7. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  8. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  9. Optimal coordinated scheduling of combined heat and power fuel cell, wind, and photovoltaic units in micro grids considering uncertainties

    International Nuclear Information System (INIS)

    Bornapour, Mosayeb; Hooshmand, Rahmat-Allah; Khodabakhshian, Amin; Parastegari, Moein

    2016-01-01

    In this paper, a stochastic model is proposed for coordinated scheduling of combined heat and power units in micro grid considering wind turbine and photovoltaic units. Uncertainties of electrical market price; the speed of wind and solar radiation are considered using a scenario-based method. In the method, scenarios are generated using roulette wheel mechanism based on probability distribution functions of input random variables. Using this method, the probabilistic specifics of the problem are distributed and the problem is converted to a deterministic one. The type of the objective function, coordinated scheduling of combined heat and power, wind turbine, and photovoltaic units change this problem to a mixed integer nonlinear one. Therefore to solve this problem modified particle swarm optimization algorithm is employed. The mentioned uncertainties lead to an increase in profit. Moreover, the optimal coordinated scheduling of renewable energy resources and thermal units in micro grids increase the total profit. In order to evaluate the performance of the proposed method, its performance is executed on modified 33 bus distributed system as a micro grid. - Highlights: • Stochastic model is proposed for coordinated scheduling of renewable energy sources. • The effect of combined heat and power is considered. • Maximizing profits of micro grid is considered as objective function. • Considering the uncertainties of problem lead to profit increasing. • Optimal scheduling of renewable energy sources and thermal units increases profit.

  10. Hybrid robust predictive optimization method of power system dispatch

    Science.gov (United States)

    Chandra, Ramu Sharat [Niskayuna, NY; Liu, Yan [Ballston Lake, NY; Bose, Sumit [Niskayuna, NY; de Bedout, Juan Manuel [West Glenville, NY

    2011-08-02

    A method of power system dispatch control solves power system dispatch problems by integrating a larger variety of generation, load and storage assets, including without limitation, combined heat and power (CHP) units, renewable generation with forecasting, controllable loads, electric, thermal and water energy storage. The method employs a predictive algorithm to dynamically schedule different assets in order to achieve global optimization and maintain the system normal operation.

  11. Residency Applicants Prefer Online System for Scheduling Interviews

    Directory of Open Access Journals (Sweden)

    Wills, Charlotte

    2015-03-01

    Full Text Available Introduction: Residency coordinators may be overwhelmed when scheduling residency interviews. Applicants often have to coordinate interviews with multiple programs at once, and relying on verbal or email confirmation may delay the process. Our objective was to determine applicant mean time to schedule and satisfaction using online scheduling. Methods: This pilot study is a retrospective analysis performed on a sample of applicants offered interviews at an urban county emergency medicine residency. Applicants were asked their estimated time to schedule with the online system compared to their average time using other methods. In addition, they were asked on a five-point anchored scale to rate their satisfaction. Results: Of 171 applicants, 121 completed the survey (70.8%. Applicants were scheduling an average of 13.3 interviews. Applicants reported scheduling interviews using the online system in mean of 46.2 minutes (median 10, range 1-1800 from the interview offer as compared with a mean of 320.2 minutes (median 60, range 3-2880 for other programs not using this system. This difference was statistically significant. In addition, applicants were more likely to rate their satisfaction using the online system as “satisfied” (83.5% vs 16.5%. Applicants were also more likely to state that they preferred scheduling their interviews using the online system rather than the way other programs scheduled interviews (74.2% vs 4.1% and that the online system aided them coordinating travel arrangements (52.1% vs 4.1%. Conclusion: An online interview scheduling system is associated with higher satisfaction among applicants both in coordinating travel arrangements and in overall satisfaction. [West J Emerg Med. 2015;16(2:352-354.

  12. Development of a system for managing document delivery schedule(DDS) for NSSS system design

    International Nuclear Information System (INIS)

    Baek, S. H.; Baek, J. M.; Sohn, Y. S.; Shon, G. H.

    1999-01-01

    The construction of nuclear power plant is a long-term project from initial design to commercial operation. To accomplish NSSS (Nuclear Steam Supply System) system design successfully, the systematic and effective method for managing the system design product and interface correspondence with other organizations is required. To meet this requirement, a system has been developed to control the document delivery schedule, approval process and interface correspondence transmittal, and to report the documentation status periodically from the beginning of the YGN 5 and 6 project. This system is expected to contribute as the beginning step to development of integrated project management system. (author)

  13. Historical Mass, Power, Schedule, and Cost Growth for NASA Spacecraft

    Science.gov (United States)

    Hayhurst, Marc R.; Bitten, Robert E.; Shinn, Stephen A.; Judnick, Daniel C.; Hallgrimson, Ingrid E.; Youngs, Megan A.

    2016-01-01

    Although spacecraft developers have been moving towards standardized product lines as the aerospace industry has matured, NASA's continual need to push the cutting edge of science to accomplish unique, challenging missions can still lead to spacecraft resource growth over time. This paper assesses historical mass, power, cost, and schedule growth for multiple NASA spacecraft from the last twenty years and compares to industry reserve guidelines to understand where the guidelines may fall short. Growth is assessed from project start to launch, from the time of the preliminary design review (PDR) to launch and from the time of the critical design review (CDR) to launch. Data is also assessed not just at the spacecraft bus level, but also at the subsystem level wherever possible, to help obtain further insight into possible drivers of growth. Potential recommendations to minimize spacecraft mass, power, cost, and schedule growth for future missions are also discussed.

  14. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  15. Effects of a shortened depreciation schedule on the investment costs for combined heat and power; TOPICAL

    International Nuclear Information System (INIS)

    Kranz, Nicole; Worrell, Ernst

    2001-01-01

    We investigate and compare several generic depreciation methods to assess the effectiveness of possible policy measures with respect to the depreciation schedules for investments in combined heat and power plants in the United States. We assess the different depreciation methods for CHP projects of various sizes (ranging from 1 MW to 100 MW). We evaluate the impact of different depreciation schedules on the tax shield, and the resulting tax savings to potential investors. We show that a shorter depreciation cycle could have a substantial impact on the cost of producing power, making cogeneration more attractive. The savings amount to approximately 6-7 percent of capital and fixed operation and maintenance costs, when changing from the current system to a 7 year depreciation scheme with switchover from declining balance to straight line depreciation. Suggestions for further research to improve the analysis are given

  16. Dynamic Sleep Scheduling on Air Pollution Levels Monitoring with Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    Gezaq Abror

    2018-01-01

    Full Text Available Wireless Sensor Network (WSN can be applied for Air Pollution Level Monitoring System that have been determined by the Environmental Impact Management Agency which is  PM10, SO2, O3, NO2 and CO. In WSN, node system is constrained to a limited power supply, so that the node system has a lifetime. To doing lifetime maximization, power management scheme is required and sensor nodes should use energy efficiently. This paper proposes dynamic sleep scheduling using Time Category-Fuzzy Logic (Time-Fuzzy Scheduling as a reference for calculating time interval for sleep and activated node system to support power management scheme. This research contributed in power management design to be applied to the WSN system to reduce energy expenditure. From the test result in real hardware node system, it can be seen that Time-Fuzzy Scheduling is better in terms of using the battery and it is better in terms of energy consumption too because it is more efficient 51.85% when it is compared with Fuzzy Scheduling, it is more efficient 68.81% when it is compared with Standard Scheduling and it is more efficient 85.03% when compared with No Scheduling.

  17. Heatpipe power system and heatpipe bimodal system design and development options

    International Nuclear Information System (INIS)

    Houts, M.G.; Poston, D.I.; Emrich, W.J. Jr.

    1997-01-01

    The Heatpipe Power System (HPS) is a potential, near-term, low-cost space fission power system. The Heatpipe Bimodal System (HBS) is a potential, near-term, low-cost space fission power and/or propulsion system. Both systems will be composed of independent modules, and all components operate within the existing databases. The HPS and HBS have relatively few system integration issues; thus, the successful development of a module is a significant step toward verifying system feasibility and performance estimates. A prototypic HPS module is being fabricated, and testing is scheduled to begin in November 1996. A successful test will provide high confidence that the HPS can achieve its predicted performance

  18. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  19. Optimal Real-Time Scheduling for Hybrid Energy Storage Systems and Wind Farms Based on Model Predictive Control

    Directory of Open Access Journals (Sweden)

    Meng Xiong

    2015-08-01

    Full Text Available Energy storage devices are expected to be more frequently implemented in wind farms in near future. In this paper, both pumped hydro and fly wheel storage systems are used to assist a wind farm to smooth the power fluctuations. Due to the significant difference in the response speeds of the two storages types, the wind farm coordination with two types of energy storage is a problem. This paper presents two methods for the coordination problem: a two-level hierarchical model predictive control (MPC method and a single-level MPC method. In the single-level MPC method, only one MPC controller coordinates the wind farm and the two storage systems to follow the grid scheduling. Alternatively, in the two-level MPC method, two MPC controllers are used to coordinate the wind farm and the two storage systems. The structure of two level MPC consists of outer level and inner level MPC. They run alternatively to perform real-time scheduling and then stop, thus obtaining long-term scheduling results and sending some results to the inner level as input. The single-level MPC method performs both long- and short-term scheduling tasks in each interval. The simulation results show that the methods proposed can improve the utilization of wind power and reduce wind power spillage. In addition, the single-level MPC and the two-level MPC are not interchangeable. The single-level MPC has the advantage of following the grid schedule while the two-level MPC can reduce the optimization time by 60%.

  20. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  1. Power Systems Development Facility

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-07-01

    This report discusses Test Campaign TC12 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (SW) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using a particulate control device (PCD). While operating as a gasifier, either air or oxygen can be used as the oxidant. Test run TC12 began on May 16, 2003, with the startup of the main air compressor and the lighting of the gasifier start-up burner. The Transport Gasifier operated until May 24, 2003, when a scheduled outage occurred to allow maintenance crews to install the fuel cell test unit and modify the gas clean-up system. On June 18, 2003, the test run resumed when operations relit the start-up burner, and testing continued until the scheduled end of the run on July 14, 2003. TC12 had a total of 733 hours using Powder River Basin (PRB) subbituminous coal. Over the course of the entire test run, gasifier temperatures varied between 1,675 and 1,850 F at pressures from 130 to 210 psig.

  2. A New Software for Management, Scheduling, and Optimization for the Light Hydrocarbon Pipeline Network System of Daqing Oilfield

    Directory of Open Access Journals (Sweden)

    Yongtu Liang

    2014-01-01

    Full Text Available This paper presents the new software which specifically developed based on Visual Studio 2010 for Daqing Oilfield China includes the most complex light hydrocarbon pipeline network system in Asia, has become a powerful auxiliary tool to manage field data, makes scheduling plans for batching operation, and optimizes pumping plans. Firstly, DMM for recording and managing field data is summarized. Then, the batch scheduling simulation module called SSM for the difficult batch-scheduling issues of the multiple-source pipeline network system is introduced. Finally, SOM, that is Scheduling Optimization Module, is indicated for solving the problem of the pumps being started up/shut-down frequently.

  3. Application exploration of primavera6.0 for design-schedule in nuclear power station

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2009-01-01

    The ideas and flow of plan establishment during the nuclear power station design is discussed in this paper, including the main steps in the plan establishment, and the design schedule and the management of documents and interfaces are improved. An integral design management innovation is proposed for the management of 'schedule, interfaces and drawings and files'. (authors)

  4. Improvement of the Performance of Scheduled Stepwise Power Programme Changes within the European Power System

    DEFF Research Database (Denmark)

    Welfonder, E.; Weissbach, T.; Schulz, U.

    2008-01-01

    Since the deregulation of the electrical energy market, the technical realisation of power transactions based on energy market contracts often effects large stepwise power programme changes – especially at the change of the hour. Due to mainly economic reasons these stepwise power programme changes...... extended discussions with power plant and power system operators as well as with power plant dispatchers the described issues will be adopted into a VGB-recommendation which shall be published by VGB Powertech for Germany and Europe. Subsequently, it is intended to include the main elements of the VGB...

  5. Decommissioning strategy and schedule for a multiple reactor nuclear power plant site

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas

    2015-07-01

    The decommissioning is an important part of every Nuclear Power Plant life cycle gaining importance when there are more than one plant at the same site due to interactions that can arise from the operational ones and a decommissioning plant. In order to prevent undesirable problems, a suitable strategy and a very rigorous schedule should implemented and carried. In this way, decommissioning tasks such as fully decontamination and dismantling of activated and contaminated systems, rooms and structures could be delayed, posing as an interesting option to multiple reactor sites. The present work aims to purpose a strategy and a schedule for the decommissioning of a multiple reactor site highlighting the benefits of delay operational tasks and constructs some auxiliary services in the site during the stand by period of the shutdown plants. As a case study, will be presented a three-reactor site which the decommissioning process actually is in planning stage and that should start in the next decade. (author)

  6. Decommissioning strategy and schedule for a multiple reactor nuclear power plant site

    International Nuclear Information System (INIS)

    Monteiro, Deiglys Borges; Moreira, Joao M.L.; Maiorino, Jose Rubens

    2015-01-01

    The decommissioning is an important part of every Nuclear Power Plant life cycle gaining importance when there are more than one plant at the same site due to interactions that can arise from the operational ones and a decommissioning plant. In order to prevent undesirable problems, a suitable strategy and a very rigorous schedule should implemented and carried. In this way, decommissioning tasks such as fully decontamination and dismantling of activated and contaminated systems, rooms and structures could be delayed, posing as an interesting option to multiple reactor sites. The present work aims to purpose a strategy and a schedule for the decommissioning of a multiple reactor site highlighting the benefits of delay operational tasks and constructs some auxiliary services in the site during the stand by period of the shutdown plants. As a case study, will be presented a three-reactor site which the decommissioning process actually is in planning stage and that should start in the next decade. (author)

  7. Static Schedulers for Embedded Real-Time Systems

    Science.gov (United States)

    1989-12-01

    Because of the need for having efficient scheduling algorithms in large scale real time systems , software engineers put a lot of effort on developing...provide static schedulers for he Embedded Real Time Systems with single processor using Ada programming language. The independent nonpreemptable...support the Computer Aided Rapid Prototyping for Embedded Real Time Systems so that we determine whether the system, as designed, meets the required

  8. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  9. Model based fleet optimisation and master control of a power production system

    International Nuclear Information System (INIS)

    Joergensen, C.; Mortensen, J.H.; Nielsen, E.O.; Moelbak, T.

    2006-01-01

    This paper discussed an optimization concept for power plants operated by the Danish power company Elsam. The power company operates a distributed power production system with fossil fuel thermal plants, biomass-fired thermal plants, waste incineration plants, on- and offshore wind power, and district heating storage units. Power and regulation power are traded on an hourly basis, while trading of district heating resources is conducted using bilateral contracts. System and plant level case studies on optimization and control were presented. A system control level was developed to ensure compliance with power market requirements. Dynamic constraints were posed by environmental regulations, grid capabilities, and fuel and district heating contracts. System components included a short-term load scheduler; a power controller; a frequency control scheduler; a marginal cost calculator; and a master control. The scheduler consisted of an optimization algorithm and a set of steady-state models designed to minimize fuel, load, and maintenance costs. Quadratic programming and mixed integer programming methods were used to minimize deviations between the total electrical power production reference value and actual power production values. The study showed that control levels can be optimized using advanced modelling and control methods. However, integration and coordination between the various levels is needed to obtain improved performance. It was concluded that a bottom-up approach starting at the lowest possible level can ensure the performance of an optimization scheme. 6 refs., 9 figs

  10. A Work-Demand Analysis Compatible with Preemption-Aware Scheduling for Power-Aware Real-Time Tasks

    Directory of Open Access Journals (Sweden)

    Da-Ren Chen

    2013-01-01

    Full Text Available Due to the importance of slack time utilization for power-aware scheduling algorithms,we propose a work-demand analysis method called parareclamation algorithm (PRA to increase slack time utilization of the existing real-time DVS algorithms. PRA is an online scheduling for power-aware real-time tasks under rate-monotonic (RM policy. It can be implemented and fully compatible with preemption-aware or transition-aware scheduling algorithms without increasing their computational complexities. The key technique of the heuristics method doubles the analytical interval and turns the deferrable workload out the potential slack time. Theoretical proofs show that PRA guarantees the task deadlines in a feasible RM schedule and takes linear time and space complexities. Experimental results indicate that the proposed method combining the preemption-aware methods seamlessly reduces the energy consumption by 14% on average over their original algorithms.

  11. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  12. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  13. Designing a fuzzy scheduler for hard real-time systems

    Science.gov (United States)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  14. Optimal Scheduling of a Multi-Carrier Energy Hub Supplemented By Battery Energy Storage Systems

    DEFF Research Database (Denmark)

    Javadi, Mohammad Sadegh; Anvari-Moghaddam, Amjad; Guerrero, Josep M.

    2017-01-01

    This paper introduces a management model for optimal scheduling of a multi-carrier energy hub. In the proposed hub, three types of assets are considered: dispersed generating systems (DGs) such as micro-combined heat and power (mCHP) units, storage devices such as battery-based electrical storage...... systems (ESSs), and heating/cooling devices such as electrical heater, heat-pumps and absorption chillers. The optimal scheduling and management of the examined energy hub assets in line with electrical transactions with distribution network is modeled as a mixed-integer non-linear optimization problem....... In this regard, optimal operating points of DG units as well as ESSs are calculated based on a cost-effective strategy. Degradation cost of ESSs is also taken into consideration for short-term scheduling. Simulation results demonstrate that including well-planned energy storage options together with optimal...

  15. Optimal stochastic reactive power scheduling in a microgrid considering voltage droop scheme of DGs and uncertainty of wind farms

    International Nuclear Information System (INIS)

    Khorramdel, Benyamin; Raoofat, Mahdi

    2012-01-01

    Distributed Generators (DGs) in a microgrid may operate in three different reactive power control strategies, including PV, PQ and voltage droop schemes. This paper proposes a new stochastic programming approach for reactive power scheduling of a microgrid, considering the uncertainty of wind farms. The proposed algorithm firstly finds the expected optimal operating point of each DG in V-Q plane while the wind speed is a probabilistic variable. A multi-objective function with goals of loss minimization, reactive power reserve maximization and voltage security margin maximization is optimized using a four-stage multi-objective nonlinear programming. Then, using Monte Carlo simulation enhanced by scenario reduction technique, the proposed algorithm simulates actual condition and finds optimal operating strategy of DGs. Also, if any DGs are scheduled to operate in voltage droop scheme, the optimum droop is determined. Also, in the second part of the research, to enhance the optimality of the results, PSO algorithm is used for the multi-objective optimization problem. Numerical examples on IEEE 34-bus test system including two wind turbines are studied. The results show the benefits of voltage droop scheme for mitigating the impacts of the uncertainty of wind. Also, the results show preference of PSO method in the proposed approach. -- Highlights: ► Reactive power scheduling in a microgrid considering loss and voltage security. ► Stochastic nature of wind farms affects reactive power scheduling and is considered. ► Advantages of using the voltage droop characteristics of DGs in voltage security are shown. ► Power loss, voltage security and VAR reserve are three goals of a multi-objective optimization. ► Monte Carlo method with scenario reduction is used to determine optimal control strategy of DGs.

  16. Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results

    International Nuclear Information System (INIS)

    Mohanta, Dusmanta Kumar; Sadhu, Pradip Kumar; Chakrabarti, R.

    2007-01-01

    This paper presents a comparison of results for optimization of captive power plant maintenance scheduling using genetic algorithm (GA) as well as hybrid GA/simulated annealing (SA) techniques. As utilities catered by captive power plants are very sensitive to power failure, therefore both deterministic and stochastic reliability objective functions have been considered to incorporate statutory safety regulations for maintenance of boilers, turbines and generators. The significant contribution of this paper is to incorporate stochastic feature of generating units and that of load using levelized risk method. Another significant contribution of this paper is to evaluate confidence interval for loss of load probability (LOLP) because some variations from optimum schedule are anticipated while executing maintenance schedules due to different real-life unforeseen exigencies. Such exigencies are incorporated in terms of near-optimum schedules obtained from hybrid GA/SA technique during the final stages of convergence. Case studies corroborate that same optimum schedules are obtained using GA and hybrid GA/SA for respective deterministic and stochastic formulations. The comparison of results in terms of interval of confidence for LOLP indicates that levelized risk method adequately incorporates the stochastic nature of power system as compared with levelized reserve method. Also the interval of confidence for LOLP denotes the possible risk in a quantified manner and it is of immense use from perspective of captive power plants intended for quality power

  17. Coordination between Generation and Transmission Maintenance Scheduling by Means of Multi-agent Technique

    Science.gov (United States)

    Nagata, Takeshi; Tao, Yasuhiro; Utatani, Masahiro; Sasaki, Hiroshi; Fujita, Hideki

    This paper proposes a multi-agent approach to maintenance scheduling in restructured power systems. The restructuring of electric power industry has resulted in market-based approaches for unbundling a multitude of service provided by self-interested entities such as power generating companies (GENCOs), transmission providers (TRANSCOs) and distribution companies (DISCOs). The Independent System Operator (ISO) is responsible for the security of the system operation. The schedule submitted to ISO by GENCOs and TRANSCOs should satisfy security and reliability constraints. The proposed method consists of several GENCO Agents (GAGs), TARNSCO Agents (TAGs) and a ISO Agent(IAG). The IAG’s role in maintenance scheduling is limited to ensuring that the submitted schedules do not cause transmission congestion or endanger the system reliability. From the simulation results, it can be seen the proposed multi-agent approach could coordinate between generation and transmission maintenance schedules.

  18. Power Saving Scheduling Scheme for Internet of Things over LTE/LTE-Advanced Networks

    Directory of Open Access Journals (Sweden)

    Yen-Wei Kuo

    2015-01-01

    Full Text Available The devices of Internet of Things (IoT will grow rapidly in the near future, and the power consumption and radio spectrum management will become the most critical issues in the IoT networks. Long Term Evolution (LTE technology will become a promising technology used in IoT networks due to its flat architecture, all-IP network, and greater spectrum efficiency. The 3rd Generation Partnership Project (3GPP specified the Discontinuous Reception (DRX to reduce device’s power consumption. However, the DRX may pose unexpected communication delay due to missing Physical Downlink Control Channel (PDCCH information in sleep mode. Recent studies mainly focus on optimizing DRX parameters to manage the tradeoff between the energy consumption and communication latency. In this paper, we proposed a fuzzy-based power saving scheduling scheme for IoT over the LTE/LTE-Advanced networks to deal with the issues of the radio resource management and power consumption from the scheduling and resource allocation perspective. The proposed scheme considers not only individual IoT device’s real-time requirement but also the overall network performance. The simulation results show that our proposed scheme can meet the requirements of the DRX cycle and scheduling latency and can save about half of energy consumption for IoT devices compared to conventional approaches.

  19. Fault Diagnosis of Power Systems Using Intelligent Systems

    Science.gov (United States)

    Momoh, James A.; Oliver, Walter E. , Jr.

    1996-01-01

    The power system operator's need for a reliable power delivery system calls for a real-time or near-real-time Al-based fault diagnosis tool. Such a tool will allow NASA ground controllers to re-establish a normal or near-normal degraded operating state of the EPS (a DC power system) for Space Station Alpha by isolating the faulted branches and loads of the system. And after isolation, re-energizing those branches and loads that have been found not to have any faults in them. A proposed solution involves using the Fault Diagnosis Intelligent System (FDIS) to perform near-real time fault diagnosis of Alpha's EPS by downloading power transient telemetry at fault-time from onboard data loggers. The FDIS uses an ANN clustering algorithm augmented with a wavelet transform feature extractor. This combination enables this system to perform pattern recognition of the power transient signatures to diagnose the fault type and its location down to the orbital replaceable unit. FDIS has been tested using a simulation of the LeRC Testbed Space Station Freedom configuration including the topology from the DDCU's to the electrical loads attached to the TPDU's. FDIS will work in conjunction with the Power Management Load Scheduler to determine what the state of the system was at the time of the fault condition. This information is used to activate the appropriate diagnostic section, and to refine if necessary the solution obtained. In the latter case, if the FDIS reports back that it is equally likely that the faulty device as 'start tracker #1' and 'time generation unit,' then based on a priori knowledge of the system's state, the refined solution would be 'star tracker #1' located in cabinet ITAS2. It is concluded from the present studies that artificial intelligence diagnostic abilities are improved with the addition of the wavelet transform, and that when such a system such as FDIS is coupled to the Power Management Load Scheduler, a faulty device can be located and isolated

  20. Analysis of Sleep-Mode Downlink Scheduling Operations in EPON Systems

    DEFF Research Database (Denmark)

    Yan, Ying; Dittmann, Lars

    2011-01-01

    Energy management strategy has been considered as an important component in the future Ethernet Passive Optical Networks (EPONs). In this paper, a sleeping mode operation is studied, and a downlink packet scheduling scheme is analyzed to preserve energy consumption and maintain the required Qo......S. This paper proposes a novel sleep-mode downlink packet scheduling scheme in order to enhance the sleep control function. Simulation results confirm that the proposed approach offers effective power management on the basis of the traffic conditions. The trade-off between network performances and the power...

  1. A Method for Optimal Load Dispatch of a Multi-zone Power System with Zonal Exchange Constraints

    Science.gov (United States)

    Hazarika, Durlav; Das, Ranjay

    2018-04-01

    This paper presented a method for economic generation scheduling of a multi-zone power system having inter zonal operational constraints. For this purpose, the generator rescheduling for a multi area power system having inter zonal operational constraints has been represented as a two step optimal generation scheduling problem. At first, the optimal generation scheduling has been carried out for the zone having surplus or deficient generation with proper spinning reserve using co-ordination equation. The power exchange required for the deficit zones and zones having no generation are estimated based on load demand and generation for the zone. The incremental transmission loss formulas for the transmission lines participating in the power transfer process among the zones are formulated. Using these, incremental transmission loss expression in co-ordination equation, the optimal generation scheduling for the zonal exchange has been determined. Simulation is carried out on IEEE 118 bus test system to examine the applicability and validity of the method.

  2. Investigation of the Bilibin reactor operation in the regime of automatic power and frequency control in isolated power system

    International Nuclear Information System (INIS)

    Sankovskij, G.A.; Molochkov, V.I.; Dolgov, V.V.; Soldatov, G.E.; Minashin, M.E.

    1981-01-01

    The results of experimental investigations of the power unit operation of the Bilibin nuclear power and heating plant (BNPHP) in the regime of automatic power and frequency control in an isolated power system are presented. The BNPHP comprises four similar power units. Each unit includes a steam generating setup - the channel water-graphite reactor with tubular fuel elements with natural circulation of boiling water at all the power levels as well as a turbosetup with two heat selectors and a turbogenerator. The turbine operates on dry saturated steam (with intermediate separation) which is brought from the drum-separator of the reactor natural circulation circuit. The BNPHP operates according to the controller schedule since the start-up of the first power unit. The BNPHP unit power varifies within the 50-100% range 3-4 times per day (by the number of maxima in the schedule of the power system loadings). Two design flowsheets of the unit power control and dynamic characteristics of the system for both vatiants are considered. It is concluded that both investigated automatic control systems are seviceable and deviations of the reactor parameters within the transients are not dangerous for heat release from the core. The plant is better shielded from external mainly short-term perturbations coming from the power system when the system operates in accordance with the first variant of the flowsheet [ru

  3. Comment on “Short-term combined economic emission scheduling of hydrothermal power systems with cascaded reservoirs using differential evolution” by K.K. Mandal and N. Chakaborty [Energy Convers. Manage. 50 (2009) 97–104

    International Nuclear Information System (INIS)

    Ahmadi, Abdollah; Nezhad, Ali Esmaeel

    2015-01-01

    This paper discusses the short-term combined economic emission scheduling of hydrothermal power systems with cascaded reservoirs [Energy Convers Manage. 50 (2009) 97–104], while differential evolution algorithm has been employed to solve the optimization problem. However, this problem is subjected to several constraints like the generation limitations of generating units. The solutions reported in the original paper do not satisfy the constraint on the initial and final reservoir storage volumes of hydro units as well as the constraint on the generated power by such units, which should be positive at any time of the scheduling period. Thus, this paper intends to prove this issue and solve the problem using Normal Boundary Intersection (NBI) method, in order to propose the correct solutions satisfying all the constraints of the short-term hydrothermal scheduling problem

  4. Economic-environmental energy and reserve scheduling of smart distribution systems: A multiobjective mathematical programming approach

    International Nuclear Information System (INIS)

    Zakariazadeh, Alireza; Jadid, Shahram; Siano, Pierluigi

    2014-01-01

    Highlights: • Environmental/economical scheduling of energy and reserve. • Simultaneous participation of loads in both energy and reserve scheduling. • Aggregate wind generation and demand uncertainties in a stochastic model. • Stochastic scheduling of energy and reserve in a distribution system. • Demand response providers’ participation in energy and reserve scheduling. - Abstract: In this paper a stochastic multi-objective economical/environmental operational scheduling method is proposed to schedule energy and reserve in a smart distribution system with high penetration of wind generation. The proposed multi-objective framework, based on augmented ε-constraint method, is used to minimize the total operational costs and emissions and to generate Pareto-optimal solutions for the energy and reserve scheduling problem. Moreover, fuzzy decision making process is employed to extract one of the Pareto-optimal solutions as the best compromise non-dominated solution. The wind power and demand forecast errors are considered in this approach and the reserve can be furnished by the main grid as well as distributed generators and responsive loads. The consumers participate in both energy and reserve markets using various demand response programs. In order to facilitate small and medium loads participation in demand response programs, a Demand Response Provider (DRP) aggregates offers for load reduction. In order to solve the proposed optimization model, the Benders decomposition technique is used to convert the large scale mixed integer non-linear problem into mixed-integer linear programming and non-linear programming problems. The effectiveness of the proposed scheduling approach is verified on a 41-bus distribution test system over a 24-h period

  5. Stochastic multiobjective self-scheduling of a power producer in joint energy and reserves markets

    International Nuclear Information System (INIS)

    Vahidinasab, V.; Jadid, S.

    2010-01-01

    This paper presents a stochastic multiobjective model for self-scheduling of a power producer which participates in the day-ahead joint energy and reserves markets. The objective of a power producer is to compromise the conflicting objectives of payoff maximization and gaseous emissions minimization when committing its generation of thermal units. The proposed schedule will be used by the power producers to decide on emission quota arbitrage opportunities and for strategic bidding to the energy and reserves market. The paper analyzes a scenario-based multiobjective model in which random distributions, such as price forecasting inaccuracies as well as forced outage of generating units are modeled as scenarios tree using a combined fuzzy c-mean/Monte-Carlo simulation (FCM/MCS) method. With the above procedure the stochastic multiobjective self-scheduling problem is converted into corresponding deterministic problems. Then a multiobjective mathematical programming (MMP) approach based on ε-constraint method is implemented for each deterministic scenario. Piecewise linearized fuel and emission cost functions are applied for computational efficiency and the model is formulated as a mixed-integer programming (MIP) problem. Numerical simulations for a power producer with 21 thermal units are discussed to demonstrate the performance of the proposed approach in increasing expected payoffs by adjusting the emission quota arbitrage opportunities. (author)

  6. Brayton Isotope Power System (BIPS) facility specification

    International Nuclear Information System (INIS)

    1976-01-01

    General requirements for the Brayton Isotope Power System (BIPS)/Ground Demonstration System (GDS) assembly and test facility are defined. The facility will include provisions for a complete test laboratory for GDS checkout, performance, and endurance testing, and a contamination-controlled area for assembly, fabrication, storage, and storage preparation of GDS components. Specifications, schedules, and drawings are included

  7. Brayton Isotope Power System (BIPS) facility specification

    Energy Technology Data Exchange (ETDEWEB)

    1976-05-31

    General requirements for the Brayton Isotope Power System (BIPS)/Ground Demonstration System (GDS) assembly and test facility are defined. The facility will include provisions for a complete test laboratory for GDS checkout, performance, and endurance testing, and a contamination-controlled area for assembly, fabrication, storage, and storage preparation of GDS components. Specifications, schedules, and drawings are included.

  8. Optimal scheduling of coproduction with a storage

    International Nuclear Information System (INIS)

    Ravn, H.F.; Rygard, J.M.

    1993-02-01

    We consider the problem of optimal scheduling of a system with combined heat and heat (CHP) units and a heat storege. The purpose of the heat storage is to permit a partial decoupling of the variations in the demand for heat and electrical power. We formulate the problem of optimal scheduling as that of minimizing the total costs over the planning period. The heat demand from the district heating system and the ''shadow prices'' for the electrical power system are taken as externally given parameters. The resulting model is solved by dynamic programming. We describe implementation details and we give examples of result of the optimization. (au) (12 refs.)

  9. Scheduling and coordination for in-service inspection of nuclear power plant

    International Nuclear Information System (INIS)

    Li Songbai

    1996-11-01

    Based on the practice and experiences of pre-service and in-service inspections for Daya Bay Nuclear Power Plant (NPP) by Research Institute of Nuclear Power Operation (RINPO) following RSEM code, requirements of utility and actual situation in China, the in-service inspection preparation for organization, techniques and equipment/tooling, materials, personnel and documentation is briefly described. And the scheduling and coordinating consideration for planed in-service inspection activities during NPP outage is emphatically introduced. (2 refs., 4 figs.)

  10. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  11. Solar energy thermally powered electrical generating system

    Science.gov (United States)

    Owens, William R. (Inventor)

    1989-01-01

    A thermally powered electrical generating system for use in a space vehicle is disclosed. The rate of storage in a thermal energy storage medium is controlled by varying the rate of generation and dissipation of electrical energy in a thermally powered electrical generating system which is powered from heat stored in the thermal energy storage medium without exceeding a maximum quantity of heat. A control system (10) varies the rate at which electrical energy is generated by the electrical generating system and the rate at which electrical energy is consumed by a variable parasitic electrical load to cause storage of an amount of thermal energy in the thermal energy storage system at the end of a period of insolation which is sufficient to satisfy the scheduled demand for electrical power to be generated during the next period of eclipse. The control system is based upon Kalman filter theory.

  12. E-Token Energy-Aware Proportionate Sharing Scheduling Algorithm for Multiprocessor Systems

    Directory of Open Access Journals (Sweden)

    Pasupuleti Ramesh

    2017-01-01

    Full Text Available WSN plays vital role from small range healthcare surveillance systems to largescale environmental monitoring. Its design for energy constrained applications is a challenging issue. Sensors in WSNs are projected to run separately for longer periods. It is of excessive cost to substitute exhausted batteries which is not even possible in antagonistic situations. Multiprocessors are used in WSNs for high performance scientific computing, where each processor is assigned the same or different workload. When the computational demands of the system increase then the energy efficient approaches play an important role to increase system lifetime. Energy efficiency is commonly carried out by using proportionate fair scheduler. This introduces abnormal overloading effect. In order to overcome the existing problems E-token Energy-Aware Proportionate Sharing (EEAPS scheduling is proposed here. The power consumption for each thread/task is calculated and the tasks are allotted to the multiple processors through the auctioning mechanism. The algorithm is simulated by using the real-time simulator (RTSIM and the results are tested.

  13. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  14. Multiprocessor scheduling for real-time systems

    CERN Document Server

    Baruah, Sanjoy; Buttazzo, Giorgio

    2015-01-01

    This book provides a comprehensive overview of both theoretical and pragmatic aspects of resource-allocation and scheduling in multiprocessor and multicore hard-real-time systems.  The authors derive new, abstract models of real-time tasks that capture accurately the salient features of real application systems that are to be implemented on multiprocessor platforms, and identify rules for mapping application systems onto the most appropriate models.  New run-time multiprocessor scheduling algorithms are presented, which are demonstrably better than those currently used, both in terms of run-time efficiency and tractability of off-line analysis.  Readers will benefit from a new design and analysis framework for multiprocessor real-time systems, which will translate into a significantly enhanced ability to provide formally verified, safety-critical real-time systems at a significantly lower cost.

  15. Optimization Scheduling Model for Wind-thermal Power System Considering the Dynamic penalty factor

    Science.gov (United States)

    PENG, Siyu; LUO, Jianchun; WANG, Yunyu; YANG, Jun; RAN, Hong; PENG, Xiaodong; HUANG, Ming; LIU, Wanyu

    2018-03-01

    In this paper, a new dynamic economic dispatch model for power system is presented.Objective function of the proposed model presents a major novelty in the dynamic economic dispatch including wind farm: introduced the “Dynamic penalty factor”, This factor could be computed by using fuzzy logic considering both the variable nature of active wind power and power demand, and it could change the wind curtailment cost according to the different state of the power system. Case studies were carried out on the IEEE30 system. Results show that the proposed optimization model could mitigate the wind curtailment and the total cost effectively, demonstrate the validity and effectiveness of the proposed model.

  16. Load-Following Voltage Controller Design for a Static Space Nuclear Power System

    International Nuclear Information System (INIS)

    Parlos, Alexander G.; Onbasioglou, Fetiye O.; Metzger, John D.

    2000-01-01

    The reliability of static space nuclear power systems (SNPSs) could be improved through the use of backup devices in addition to shunt regulators, as currently proposed for load following. Shunt regulator failure leading to reactor shutdown is possible, as is the possible need to deliver somewhat higher power level to the load than originally expected. A backup system is proposed in SNPSs to eliminate the possibility of a single-point failure in the shunt regulators and to increase the overall system power delivery capability despite changing mission needs and component characteristics. The objective of this paper is to demonstrate the feasibility of such a backup device for voltage regulation in static SNPSs that is capable of overcoming system variations resulting from operation at different power levels. A dynamic compensator is designed using the Linear Quadratic Gaussian with Loop Transfer Recovery method. The resulting compensators are gain scheduled using the SNPS electric power as the scheduling variable, resulting in a nonlinear compensator. The performance of the gain-scheduled compensator is investigated extensively using an SNPS simulator. The simulations demonstrate the effects of the fuel temperature reactivity coefficient variations on the load-following capabilities of the SNPS. Robustness analysis results demonstrate that the proposed controller exhibits significant operational flexibility, and it can be considered for long-term space mission requiring significant levels of autonomy

  17. TOPEX electrical power system

    Science.gov (United States)

    Chetty, P. R. K.; Roufberg, Lew; Costogue, Ernest

    1991-01-01

    The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

  18. The bases for optimisation of scheduled repairs and tests of safety systems to improve the NPP productive efficiency

    International Nuclear Information System (INIS)

    Bilej, D.V.; Vasil'chenko, S.V.; Vlasenko, N.I.; Vasil'chenko, V.N.; Skalozubov, V.I.

    2004-01-01

    In the frames of risk-informed approaches the paper proposed the theoretical bases for methods of optimisation of scheduled repairs and tests of safety systems at nuclear power plants. The optimisation criterion is the objective risk function minimising. This function depends on the scheduled repairs/tests periodicity and the allowed time to bring the system channel to a state of non-operability. The main optimisation direct is to reduce the repair time with the purpose of enhancement of productive efficiency

  19. 38 CFR 4.119 - Schedule of ratings-endocrine system.

    Science.gov (United States)

    2010-07-01

    ... minute), eye involvement, muscular weakness, loss of weight, and sympathetic nervous system...-endocrine system. 4.119 Section 4.119 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Endocrine System § 4.119 Schedule of ratings...

  20. A Mechanized Decision Support System for Academic Scheduling.

    Science.gov (United States)

    1986-03-01

    an operational system called software. The first step in the development phase is Design . Designers destribute software control by factoring the Data...SUBJECT TERMS (Continue on reverse if necessary and identify by block number) ELD GROUP SUB-GROUP Scheduling, Decision Support System , Software Design ...scheduling system . It will also examine software - design techniques to identify the most appropriate method- ology for this problem. " - Chapter 3 will

  1. An advanced control system for the optimal operation and management of medium size power systems with a large penetration from renewable power sources

    Energy Technology Data Exchange (ETDEWEB)

    Nogaret, E.; Stavrakakis, G.; Kariniotakis, G. [Ecole de Mines de Paris, Centre d`Energetique, Sophia-Antipolis (France)] [and others

    1997-10-01

    An advanced control system for the optimal operation and management of autonomous wind-diesel systems is presented. This system minimises the production costs through an on-line optimal scheduling of the power units, which takes into account the technical constraints of the diesel units, as well as short-term forecasts of the load and renewable resources. The power system security is maximised through on-line security assessment modules, which enable the power system to withstand sudden changes in the production of the renewable sources. The control system was evaluated using data from the island of Lemnos, where it has been installed and operated since January 1995. (Author)

  2. Electromagnetic interference-aware transmission scheduling and power control for dynamic wireless access in hospital environments.

    Science.gov (United States)

    Phunchongharn, Phond; Hossain, Ekram; Camorlinga, Sergio

    2011-11-01

    We study the multiple access problem for e-Health applications (referred to as secondary users) coexisting with medical devices (referred to as primary or protected users) in a hospital environment. In particular, we focus on transmission scheduling and power control of secondary users in multiple spatial reuse time-division multiple access (STDMA) networks. The objective is to maximize the spectrum utilization of secondary users and minimize their power consumption subject to the electromagnetic interference (EMI) constraints for active and passive medical devices and minimum throughput guarantee for secondary users. The multiple access problem is formulated as a dual objective optimization problem which is shown to be NP-complete. We propose a joint scheduling and power control algorithm based on a greedy approach to solve the problem with much lower computational complexity. To this end, an enhanced greedy algorithm is proposed to improve the performance of the greedy algorithm by finding the optimal sequence of secondary users for scheduling. Using extensive simulations, the tradeoff in performance in terms of spectrum utilization, energy consumption, and computational complexity is evaluated for both the algorithms.

  3. A Review Of Fault Tolerant Scheduling In Multicore Systems

    Directory of Open Access Journals (Sweden)

    Shefali Malhotra

    2015-05-01

    Full Text Available Abstract In this paper we have discussed about various fault tolerant task scheduling algorithm for multi core system based on hardware and software. Hardware based algorithm which is blend of Triple Modulo Redundancy and Double Modulo Redundancy in which Agricultural Vulnerability Factor is considered while deciding the scheduling other than EDF and LLF scheduling algorithms. In most of the real time system the dominant part is shared memory.Low overhead software based fault tolerance approach can be implemented at user-space level so that it does not require any changes at application level. Here redundant multi-threaded processes are used. Using those processes we can detect soft errors and recover from them. This method gives low overhead fast error detection and recovery mechanism. The overhead incurred by this method ranges from 0 to 18 for selected benchmarks. Hybrid Scheduling Method is another scheduling approach for real time systems. Dynamic fault tolerant scheduling gives high feasibility rate whereas task criticality is used to select the type of fault recovery method in order to tolerate the maximum number of faults.

  4. Thermal Unit Commitment Scheduling Problem in Utility System by Tabu Search Embedded Genetic Algorithm Method

    Directory of Open Access Journals (Sweden)

    C. Christober Asir Rajan

    2008-06-01

    Full Text Available The objective of this paper is to find the generation scheduling such that the total operating cost can be minimized, when subjected to a variety of constraints. This also means that it is desirable to find the optimal unit commitment in the power system for the next H hours. A 66-bus utility power system in India demonstrates the effectiveness of the proposed approach; extensive studies have also been performed for different IEEE test systems consist of 24, 57 and 175 buses. Numerical results are shown comparing the cost solutions and computation time obtained by different intelligence and conventional methods.

  5. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Mariano, S.J.P.S. [Beira Interior Univ., Covilha (Portugal). Dept. of Electromechanical Engineering; Mendes, V.M.F. [Superior Engineering Inst. of Lisbon, Lisbon (Portugal). Dept. of Electrical Engineering and Automation; Ferreira, L.A.F.M. [Technical Univ. of Lisbon, Superior Technical Inst., Lisbon (Portugal). Dept. of Electrical Engineering and Computers

    2008-07-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs.

  6. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2008-01-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs

  7. Joint Throughput Maximization and Fair Uplink Transmission Scheduling in CDMA Systems

    Directory of Open Access Journals (Sweden)

    Symeon Papavassiliou

    2009-01-01

    Full Text Available We study the fundamental problem of optimal transmission scheduling in a code-division multiple-access wireless system in order to maximize the uplink system throughput, while satisfying the users quality-of-service (QoS requirements and maintaining fairness among them. The corresponding problem is expressed as a weighted throughput maximization problem, under certain power and QoS constraints, where the weights are the control parameters reflecting the fairness constraints. With the introduction of the power index capacity, it is shown that this optimization problem can be converted into a binary knapsack problem, where all the corresponding constraints are replaced by the power index capacities at some certain system power index. A two-step approach is followed to obtain the optimal solution. First, a simple method is proposed to find the optimal set of users to receive service for a given fixed target system load, and then the optimal solution is obtained as a global search within a certain range. Furthermore, a stochastic approximation method is presented to effectively identify the required control parameters. The performance evaluation reveals the advantages of our proposed policy over other existing ones and confirms that it achieves very high throughput while maintains fairness among the users, under different channel conditions and requirements.

  8. 38 CFR 4.97 - Schedule of ratings-respiratory system.

    Science.gov (United States)

    2010-07-01

    ...-respiratory system. 4.97 Section 4.97 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Respiratory System § 4.97 Schedule of ratings—respiratory system. Rating DISEASES OF THE NOSE AND THROAT 6502Septum, nasal, deviation of: Traumatic only...

  9. Combined scheduling of electricity and heat in a microgrid with volatile wind power

    DEFF Research Database (Denmark)

    Xu, Lizhong; Yang, Guang Ya; Xu, Zhao

    2011-01-01

    An optimization model is developed for scheduling electricity and heat production in a microgrid under a day-ahead market environment considering the operation constraints and the volatility of wind power generation. The model optimizes the total operation costs from energy and heating consumption...... into a mixed-integer programming (MIP) problem. Numerical simulations present the efficacy of the proposed model for day-ahead scheduling of a microgrid with wind penetration under the deregulated environment. © 2011 State Grid Electrtic Resarch Institute Press....

  10. Modeling of Agile Intelligent Manufacturing-oriented Production Scheduling System

    Institute of Scientific and Technical Information of China (English)

    Zhong-Qi Sheng; Chang-Ping Tang; Ci-Xing Lv

    2010-01-01

    Agile intelligent manufacturing is one of the new manufacturing paradigms that adapt to the fierce globalizing market competition and meet the survival needs of the enterprises, in which the management and control of the production system have surpassed the scope of individual enterprise and embodied some new features including complexity, dynamicity, distributivity, and compatibility. The agile intelligent manufacturing paradigm calls for a production scheduling system that can support the cooperation among various production sectors, the distribution of various resources to achieve rational organization, scheduling and management of production activities. This paper uses multi-agents technology to build an agile intelligent manufacturing-oriented production scheduling system. Using the hybrid modeling method, the resources and functions of production system are encapsulated, and the agent-based production system model is established. A production scheduling-oriented multi-agents architecture is constructed and a multi-agents reference model is given in this paper.

  11. Optimal Planning and Operation Management of a Ship Electrical Power System with Energy Storage System

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Dragicevic, Tomislav; Meng, Lexuan

    2016-01-01

    Next generation power management at all scales is highly relying on the efficient scheduling and operation of different energy sources to maximize efficiency and utility. The ability to schedule and modulate the energy storage options within energy systems can also lead to more efficient use...... of the generating units. This optimal planning and operation management strategy becomes increasingly important for off-grid systems that operate independently of the main utility, such as microgrids or power systems on marine vessels. This work extends the principles of optimal planning and economic dispatch...... for the proposed plan is derived based on the solution from a mixed-integer nonlinear programming (MINLP) problem. Simulation results showed that including well-sized energy storage options together with optimal operation management of generating units can improve the economic operation of the test system while...

  12. 38 CFR 4.104 - Schedule of ratings-cardiovascular system.

    Science.gov (United States)

    2010-07-01

    ...-cardiovascular system. 4.104 Section 4.104 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Cardiovascular System § 4.104 Schedule of ratings—cardiovascular system. Diseases of the Heart Rating Note (1): Evaluate cor pulmonale, which is a form of...

  13. Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis of orbital systems

    Science.gov (United States)

    1976-01-01

    Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.

  14. A long-term optimization method for reservoir management in a market oriented hydro-dominated power systems

    International Nuclear Information System (INIS)

    Sultovic, E.; Sarajcev, I.; Majstrovic, M.

    2001-01-01

    This paper presents an optimization-based method for the long-term scheduling of hydrothermal power system. The proposed method maximizes the profit of hydroelectric production in power system based on monthly energy requirement of the system and unit commitment calculations. The method allows precise hydro chain modeling with numerous restrictions as well as computation for multiple-reservoir river systems with multiple-purpose operation. The method has been implemented in a computer program and tested on power system, which is very similar to Croatian Power System in the year 2000. Several testing results are given. Presented method can be applicable for long-term planning in a competitive electricity market due to possibility of unit commitment calculations with different electrical energy price during scheduling horizon. (authors)

  15. Optimal stochastic coordinated scheduling of proton exchange membrane fuel cell-combined heat and power, wind and photovoltaic units in micro grids considering hydrogen storage

    International Nuclear Information System (INIS)

    Bornapour, Mosayeb; Hooshmand, Rahmat-Allah; Khodabakhshian, Amin; Parastegari, Moein

    2017-01-01

    Highlights: •Stochastic model is proposed for coordinated scheduling of renewable energy sources. •The effect of combined heat and power is considered. •Hydrogen storage is considered for fuel cells. •Maximizing profits of micro grid is considered as objective function. •Considering the uncertainties of problem lead to profit increasing. -- Abstract: Nowadays, renewable energy sources and combined heat and power units are extremely used in micro grids, so it is necessary to schedule these units to improve the performance of the system. In this regard, a stochastic model is proposed in this paper to schedule proton exchange membrane fuel cell-combined heat and power, wind turbines, and photovoltaic units coordinately in a micro grid while considering hydrogen storage. Hydrogen storage strategy is considered for the operation of proton exchange membrane fuel cell-combined heat and power units. To consider stochastic generation of renewable energy source units in this paper, a scenario-based method is used. In this method, the uncertainties of electrical market price, the wind speed, and solar irradiance are considered. This stochastic scheduling problem is a mixed integer- nonlinear programming which considers the proposed objective function and variables of coordinated scheduling of PEMFC-CHP, wind turbines and photovoltaic units. It also considers hydrogen storage strategy and converts it to a mixed integer nonlinear problem. In this study a modified firefly algorithm is used to solve the problem. This method is examined on modified 33-bus distributed network as a MG for its performance.

  16. Scheduling Algorithms for Maximizing Throughput with Zero-Forcing Beamforming in a MIMO Wireless System

    Science.gov (United States)

    Foronda, Augusto; Ohta, Chikara; Tamaki, Hisashi

    Dirty paper coding (DPC) is a strategy to achieve the region capacity of multiple input multiple output (MIMO) downlink channels and a DPC scheduler is throughput optimal if users are selected according to their queue states and current rates. However, DPC is difficult to implement in practical systems. One solution, zero-forcing beamforming (ZFBF) strategy has been proposed to achieve the same asymptotic sum rate capacity as that of DPC with an exhaustive search over the entire user set. Some suboptimal user group selection schedulers with reduced complexity based on ZFBF strategy (ZFBF-SUS) and proportional fair (PF) scheduling algorithm (PF-ZFBF) have also been proposed to enhance the throughput and fairness among the users, respectively. However, they are not throughput optimal, fairness and throughput decrease if each user queue length is different due to different users channel quality. Therefore, we propose two different scheduling algorithms: a throughput optimal scheduling algorithm (ZFBF-TO) and a reduced complexity scheduling algorithm (ZFBF-RC). Both are based on ZFBF strategy and, at every time slot, the scheduling algorithms have to select some users based on user channel quality, user queue length and orthogonality among users. Moreover, the proposed algorithms have to produce the rate allocation and power allocation for the selected users based on a modified water filling method. We analyze the schedulers complexity and numerical results show that ZFBF-RC provides throughput and fairness improvements compared to the ZFBF-SUS and PF-ZFBF scheduling algorithms.

  17. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  18. PLAN-IT - Scheduling assistant for solar system exploration

    International Nuclear Information System (INIS)

    Dias, W. C.; Henricks, J. A.; Wong, J. C.; California Institute of Technology, Pasadena)

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered. 13 references

  19. Systems and methods for distributing power using photovoltaic resources and a shifting battery system

    Science.gov (United States)

    Mammoli, Andrea A.; Lavrova, Olga; Arellano, Brian; Cheng, Feng; Greenwood, Wesley; Hawkins, Jonathan; Willard, Steve

    2017-06-27

    The present invention is an apparatus and method for delivering energy using a renewable resource. The method includes providing a photovoltaic energy source and applying energy storage to the photovoltaic energy source via a battery storage unit. The energy output from the photovoltaic energy source and the battery system is controlled using a battery control system. The battery control system predicts peak load, develops a schedule that includes when to begin discharging power and when to stop discharging power, shifts power to the battery storage unit when excess power is available, and prioritizes the functionality of the battery storage unit and the photovoltaic energy source.

  20. Stochastic risk-constrained short-term scheduling of industrial cogeneration systems in the presence of demand response programs

    International Nuclear Information System (INIS)

    Alipour, Manijeh; Mohammadi-Ivatloo, Behnam; Zare, Kazem

    2014-01-01

    Highlights: • Short-term self-scheduling problem of customers with CHP units is conducted. • Power demand and pool prices are forecasted using ARIMA models. • Risk management problem is conducted by implementing CVaR methodology. • The demand response program is implemented in self-scheduling problem of CHP units. • Non-convex feasible operation region in different types of CHP units is modeled. - Abstract: This paper presents a stochastic programming framework for solving the scheduling problem faced by an industrial customer with cogeneration facilities, conventional power production system, and heat only units. The power and heat demands of the customer are supplied considering demand response (DR) programs. In the proposed DR program, the responsive load can vary in different time intervals. In the paper, the heat-power dual dependency characteristic in different types of CHP units is taken into account. In addition, a heat buffer tank, with the ability of heat storage, has been incorporated in the proposed framework. The impact of the market and load uncertainties on the scheduling problem is characterized through a stochastic programming formulation. Autoregressive integrated moving average (ARIMA) technique is used to generate the electricity price and the customer demand scenarios. The daily and weekly seasonalities of demand and market prices are taken into account in the scenario generation procedure. The conditional value-at-risk (CVaR) methodology is implemented in order to limit the risk of expected profit due to market price and load forecast volatilities

  1. Best Speed Fit EDF Scheduling for Performance Asymmetric Multiprocessors

    Directory of Open Access Journals (Sweden)

    Peng Wu

    2017-01-01

    Full Text Available In order to improve the performance of a real-time system, asymmetric multiprocessors have been proposed. The benefits of improved system performance and reduced power consumption from such architectures cannot be fully exploited unless suitable task scheduling and task allocation approaches are implemented at the operating system level. Unfortunately, most of the previous research on scheduling algorithms for performance asymmetric multiprocessors is focused on task priority assignment. They simply assign the highest priority task to the fastest processor. In this paper, we propose BSF-EDF (best speed fit for earliest deadline first for performance asymmetric multiprocessor scheduling. This approach chooses a suitable processor rather than the fastest one, when allocating tasks. With this proposed BSF-EDF scheduling, we also derive an effective schedulability test.

  2. Scheduling and Communication Synthesis for Distributed Real-Time Systems

    DEFF Research Database (Denmark)

    Pop, Paul

    2000-01-01

    on aspects of scheduling and communication for embedded real-time systems. Special emphasis has been placed on the impact of the communication infrastructure and protocol on the overall system performance. The scheduling and communication strategies proposed are based on an abstract graph representation...

  3. To Problem Pertaining to Provision of Electric Power Load Schedules of Power Sys- tems while Involving Potential of Power Technological Sources of Industrial Enterprises

    Directory of Open Access Journals (Sweden)

    B. M. Khroustalev

    2010-01-01

    Full Text Available The paper considers a possibility to use co-generated complexes having heat technological industrial load for operation in accordance with the requirements of irregularity of electric power generation schedule.

  4. Aseismic foundation system for nuclear power stations

    International Nuclear Information System (INIS)

    Jolivet, F.; Richli, M.

    1977-01-01

    The aseismic foundation system, as described in this paper, is a new development, which makes it possible to build standard nuclear power stations in areas exposed to strong earthquakes. By adopting proven engineering concepts in design and construction of components, great advantages are achieved in the following areas: safety and reliability; efficiency; design schedule; cost. The need for an aseismic foundation system will arise more and more, as a large part of nuclear power station sites are located in highly seismic zones or must meet high intensity earthquake criteria due to the lack of historic data. (Auth.)

  5. Optimal Power Scheduling for an Islanded Hybrid Microgrid

    DEFF Research Database (Denmark)

    Hernández, Adriana Carolina Luna; Aldana, Nelson Leonardo Diaz; Savaghebi, Mehdi

    2016-01-01

    model, wherein the disconnection of the load and not charging the battery when there is surplus of energy are penalized while physical constraints and requirements for a feasible deployment in the real system are considered. The proposed scheduling scheme is tested using a real-time control platform (d...

  6. Optimal charging scheduling for large-scale EV (electric vehicle) deployment based on the interaction of the smart-grid and intelligent-transport systems

    International Nuclear Information System (INIS)

    Luo, Yugong; Zhu, Tao; Wan, Shuang; Zhang, Shuwei; Li, Keqiang

    2016-01-01

    The widespread use of electric vehicles (EVs) is becoming an imminent trend. Research has been done on the scheduling of EVs from the perspective of the charging characteristic, improvement in the safety and economy of the power grid, or the traffic jams in the transport system caused by a large number of EVs driven to charging stations. There is a lack of systematic studies considering EVs, the power grid, and the transport system all together. In this paper, a novel optimal charging scheduling strategy for different types of EVs is proposed based on not only transport system information, such as road length, vehicle velocity and waiting time, but also grid system information, such as load deviation and node voltage. In addition, a charging scheduling simulation platform suitable for large-scale EV deployment is developed based on actual charging scenarios. The simulation results show that the improvements in both the transport system efficiency and the grid system operation can be obtained by using the optimal strategy, such as the node voltage drop is decreased, the power loss is reduced, and the load curve is optimized. - Highlights: • A novel optimal charging scheduling strategy is proposed for different electric vehicles (EVs). • A simulation platform suitable for large-scale EV deployment is established. • The traffic congestion near the charging and battery-switch stations is relieved. • The safety and economy problems of the distribution network are solved. • The peak-to-valley load of the distribution system is reduced.

  7. Research on the ITOC based scheduling system for ship piping production

    Science.gov (United States)

    Li, Rui; Liu, Yu-Jun; Hamada, Kunihiro

    2010-12-01

    Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping factory, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory, was demonstrated.

  8. Analysis of Sleep-Mode Downlink Scheduling Operations in EPON Systems

    OpenAIRE

    Yan, Ying; Dittmann, Lars

    2011-01-01

    Energy management strategy has been considered as an important component in the future Ethernet Passive Optical Networks (EPONs). In this paper, a sleeping mode operation is studied, and a downlink packet scheduling scheme is analyzed to preserve energy consumption and maintain the required QoS. This paper proposes a novel sleep-mode downlink packet scheduling scheme in order to enhance the sleep control function. Simulation results confirm that the proposed approach offers effective power ma...

  9. Collaborative Scheduling between OSPPs and Gasholders in Steel Mill under Time-of-Use Power Price

    Directory of Open Access Journals (Sweden)

    Juxian Hao

    2017-08-01

    Full Text Available Byproduct gases generated during steel production process are the main fuels for on-site power plants (OSPPs in steel enterprises. Recently, with the implementation of time-of-use (TOU power price in China, increasing attention has been paid to the collaborative scheduling between OSPPs and gasholders. However, the load shifting potential of OSPPs has seldom been discussed in previous studies. In this paper, a mixed integer linear programming (MILP-based scheduling model is built to evaluate the load shifting potential and the corresponding economic benefits. A case study is conducted on two steel enterprises with different configurations of OSPPs, and the optimal operation strategy is also discussed.

  10. Reserve valuation in electric power systems

    Science.gov (United States)

    Ruiz, Pablo Ariel

    Operational reliability is provided in part by scheduling capacity in excess of the load forecast. This reserve capacity balances the uncertain power demand with the supply in real time and provides for equipment outages. Traditionally, reserve scheduling has been ensured by enforcing reserve requirements in the operations planning. An alternate approach is to employ a stochastic formulation, which allows the explicit modeling of the sources of uncertainty. This thesis compares stochastic and reserve methods and evaluates the benefits of a combined approach for the efficient management of uncertainty in the unit commitment problem. Numerical studies show that the unit commitment solutions obtained for the combined approach are robust and superior with respect to the traditional approach. These robust solutions are especially valuable in areas with a high proportion of wind power, as their built-in flexibility allows the dispatch of practically all the available wind power while minimizing the costs of operation. The scheduled reserve has an economic value since it reduces the outage costs. In several electricity markets, reserve demand functions have been implemented to take into account the value of reserve in the market clearing process. These often take the form of a step-down function at the reserve requirement level, and as such they may not appropriately represent the reserve value. The value of reserve is impacted by the reliability, dynamic and stochastic characteristics of system components, the system operation policies, and the economic aspects such as the risk preferences of the demand. In this thesis, these aspects are taken into account to approximate the reserve value and construct reserve demand functions. Illustrative examples show that the demand functions constructed have similarities with those implemented in some markets.

  11. Design of equipment management information system for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Chengyuan

    1996-01-01

    The author describes the ideas and practical method for need analysis, system function dividing, code design, program design and network disposition of equipment purchase management system of nuclear power plant during building, from the view of engineering investment control, schedule control and quality control

  12. Power profiling of Cholesky and QR factorizations on distributed memory systems

    KAUST Repository

    Bosilca, George; Ltaief, Hatem; Dongarra, Jack

    2012-01-01

    with a dynamic distributed scheduler (DAGuE) to leverage distributed memory systems. We present performance results (Gflop/s) as well as the power profile (Watts) of two common dense factorizations needed to solve linear systems of equations, namely

  13. Intelligent scheduling of execution for customized physical fitness and healthcare system.

    Science.gov (United States)

    Huang, Chung-Chi; Liu, Hsiao-Man; Huang, Chung-Lin

    2015-01-01

    Physical fitness and health of white collar business person is getting worse and worse in recent years. Therefore, it is necessary to develop a system which can enhance physical fitness and health for people. Although the exercise prescription can be generated after diagnosing for customized physical fitness and healthcare. It is hard to meet individual execution needs for general scheduling of physical fitness and healthcare system. So the main purpose of this research is to develop an intelligent scheduling of execution for customized physical fitness and healthcare system. The results of diagnosis and prescription for customized physical fitness and healthcare system will be generated by fuzzy logic Inference. Then the results of diagnosis and prescription for customized physical fitness and healthcare system will be scheduled and executed by intelligent computing. The scheduling of execution is generated by using genetic algorithm method. It will improve traditional scheduling of exercise prescription for physical fitness and healthcare. Finally, we will demonstrate the advantages of the intelligent scheduling of execution for customized physical fitness and healthcare system.

  14. Multiprocessor Global Scheduling on Frame-Based DVFS Systems

    OpenAIRE

    Berten, Vandy; Goossens, Joël

    2008-01-01

    International audience; In this work, we are interested in multiprocessor energy efficient systems where task durations are not known in advance but are known stochastically. More precisely we consider global scheduling algorithms for frame-based multiprocessor stochastic DVFS (Dynamic Voltage and Frequency Scaling) systems. Moreover we consider processors with a discrete set of available frequencies. We provide a global scheduling algorithm, and formally show that no deadline will ever be mi...

  15. A Heuristic Approach for Determining Lot Sizes and Schedules Using Power-of-Two Policy

    Directory of Open Access Journals (Sweden)

    Esra Ekinci

    2007-01-01

    Full Text Available We consider the problem of determining realistic and easy-to-schedule lot sizes in a multiproduct, multistage manufacturing environment. We concentrate on a specific type of production, namely, flow shop type production. The model developed consists of two parts, lot sizing problem and scheduling problem. In lot sizing problem, we employ binary integer programming and determine reorder intervals for each product using power-of-two policy. In the second part, using the results obtained of the lot sizing problem, we employ mixed integer programming to determine schedules for a multiproduct, multistage case with multiple machines in each stage. Finally, we provide a numerical example and compare the results with similar methods found in practice.

  16. A distributed scheduling algorithm for heterogeneous real-time systems

    Science.gov (United States)

    Zeineldine, Osman; El-Toweissy, Mohamed; Mukkamala, Ravi

    1991-01-01

    Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

  17. Dynamic Isotope Power System: technology verification phase, program plan, 1 October 1978

    International Nuclear Information System (INIS)

    1979-01-01

    The technology verification phase program plan of the Dynamic Isotope Power System (DIPS) project is presented. DIPS is a project to develop a 0.5 to 2.0 kW power system for spacecraft using an isotope heat source and a closed-cycle Rankine power-system with an organic working fluid. The technology verification phase's purposes are to increase the system efficiency to over 18%, to demonstrate system reliability, and to provide an estimate for flight test scheduling. Progress toward these goals is reported

  18. Operation and maintenance support expert systems for BWR nuclear power plants

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo; Hayakawa, Hiroyasu; Fukutomi, Shigeki

    1990-01-01

    Toshiba has been developing expert systems for operation and maintenance support in BWRs. These expert systems are designed to be integrated with conventional plant monitoring systems, and maintenance management systems to provide both comprehensive and powerful support capabilities. Some of these expert systems are already being used on a trial basis both within Toshiba and in electric power utility companies. This paper describes expert systems for the support of plant and equipment monitoring, maintenance scheduling, and maintenance work procedure planning. (author)

  19. Operation Modeling of Power Systems Integrated with Large-Scale New Energy Power Sources

    Directory of Open Access Journals (Sweden)

    Hui Li

    2016-10-01

    Full Text Available In the most current methods of probabilistic power system production simulation, the output characteristics of new energy power generation (NEPG has not been comprehensively considered. In this paper, the power output characteristics of wind power generation and photovoltaic power generation are firstly analyzed based on statistical methods according to their historical operating data. Then the characteristic indexes and the filtering principle of the NEPG historical output scenarios are introduced with the confidence level, and the calculation model of NEPG’s credible capacity is proposed. Based on this, taking the minimum production costs or the best energy-saving and emission-reduction effect as the optimization objective, the power system operation model with large-scale integration of new energy power generation (NEPG is established considering the power balance, the electricity balance and the peak balance. Besides, the constraints of the operating characteristics of different power generation types, the maintenance schedule, the load reservation, the emergency reservation, the water abandonment and the transmitting capacity between different areas are also considered. With the proposed power system operation model, the operation simulations are carried out based on the actual Northwest power grid of China, which resolves the new energy power accommodations considering different system operating conditions. The simulation results well verify the validity of the proposed power system operation model in the accommodation analysis for the power system which is penetrated with large scale NEPG.

  20. Schedulability analysis for systems with data and control dependencies

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2000-01-01

    Is this paper we present an approach to schedulability analysis for hard real-time systems with control and data dependencies. We consider distributed architectures consisting of multiple programmable processors, and the scheduling policy is based on a static priority preemptive strategy! Our model...... of the system captures bath data and control dependencies, and the schedulability approach is able to reduce the pessimism of the analysis by using the knowledge about control ann data dependencies. Extensive experiments as well as a real life example demonstrate the efficiency of our approach....

  1. Short-Term Planning of Hybrid Power System

    Science.gov (United States)

    Knežević, Goran; Baus, Zoran; Nikolovski, Srete

    2016-07-01

    In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.

  2. Sustaining neutral beam power supply system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Eckard, R.D.; Van Ness, H.W.

    1979-01-01

    A fixed-price procurement contract for $24.9 million was awarded to Aydin Energy Division, Palo Alto, CA, for the design, manufacture, installation, and acceptance testing of the sustaining neutral beam power supply system (SNBPSS). This system is scheduled for completion in early 1981 and will provide the conditioned power for the 24 neutral beam source modules. Each of the 24 power supply sets will provide the accel potential of 80 kV at 88 A, the arc power, the filament power, and the suppressor power for its associated neutral beam source module

  3. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  4. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  5. Fuzzy generation scheduling for a generation company (GenCo) with large scale wind farms

    International Nuclear Information System (INIS)

    Siahkali, H.; Vakilian, M.

    2010-01-01

    Wind power is a promising alternative in power generation because of its tremendous environmental and social benefits. Generation scheduling (GS) is more important in a power system integrating wind farms. Unlike conventional power generation sources, wind power generators supply intermittent power because of uncertainty in resource. This paper presents a fuzzy approach to the generation scheduling problem of a GenCo considering uncertainties in parameters or constraints such as load, reserve and available wind power generation. The modeling of constraints is an important issue in power system scheduling. A fuzzy optimization approach is an approach that can be used to obtain the generation scheduling under an uncertain environment. In this paper, a fuzzy optimization-based method is developed to solve power system GS problem with fuzzy objective and constraints. The crisp formulation of this GS problem is firstly defined and is rearranged by introduction of a membership function of some constraints and objective function. Then, this fuzzy optimization problem is converted to a crisp optimization and solved using GAMS software by mixed integer nonlinear programming. Employing the fuzzy optimization GS, it is expected that in practice a higher profit would be achieved in the operation and cost management of a real power system with large scale wind farms in different level of constraints' satisfaction. The proposed approach is applied to a sample system (including six conventional units and two wind farms) and the results are compared with the results of crisp solution. This approach is also applied to a larger test case to demonstrate the robustness of this fuzzy optimization method.

  6. An Event-driven, Value-based, Pull Systems Engineering Scheduling Approach

    Science.gov (United States)

    2012-03-01

    combining a services approach to systems engineering with a kanban -based scheduling system. It provides the basis for validating the approach with...agent-based simulations. Keywords-systems engineering; systems engineering process; lean; kanban ; process simulation I. INTRODUCTION AND BACKGROUND...approaches [8], [9], we are investigating the use of flow-based pull scheduling techniques ( kanban systems) in a rapid response development

  7. Designing a prototype of the ITER pulse scheduling system

    International Nuclear Information System (INIS)

    Yamamoto, T.; Yonekawa, I.; Ohta, K.; Hosoyama, H.; Hashimoto, Y.; Wallander, A.; Winter, A.; Sugie, T.; Kusama, Y.; Kawano, Y.; Yoshino, R.

    2012-01-01

    Highlights: ► We designed a prototype of the ITER pulse scheduling system. ► Structure of ITER pulse schedules was designed. ► Validation and automatic value assignment functions were adopted. ► A prototype will be implemented in 2011. - Abstract: A prototype of the ITER pulse scheduling system that prepares and manages parameters for ITER plasma operations has been designed. Based on the analyzed requirements on the system, structure of the parameters and necessary functions were determined. Segment and module structures were tuned to the ITER requirements. Three types of validations assure sanity of the parameters. The design limits check and the operation window check verify whether the values of the parameters do not exceed the limits. The consistency check calculates dependency among parameters in accordance with logics described in a scripting language. The ITER pulse scheduling system provides interface with a physics model and simulator. Some abstract physics parameters are converted to engineering parameters with the physics simulation. The results of simulation such as plasma characteristics of specified parameters are also shown to the researchers. The tool to specify the parameters is data-driven. Therefore, it is flexible for changes of number of the parameters. A prototype is being implemented in 2011. Using the prototype, this design will be verified and refined. The evaluation of the prototype will be a basis of the final production of the ITER pulse scheduling system.

  8. Optimal Scheduling of Residential Microgrids Considering Virtual Energy Storage System

    Directory of Open Access Journals (Sweden)

    Weiliang Liu

    2018-04-01

    Full Text Available The increasingly complex residential microgrids (r-microgrid consisting of renewable generation, energy storage systems, and residential buildings require a more intelligent scheduling method. Firstly, aiming at the radiant floor heating/cooling system widely utilized in residential buildings, the mathematical relationship between the operative temperature and heating/cooling demand is established based on the equivalent thermodynamic parameters (ETP model, by which the thermal storage capacity is analyzed. Secondly, the radiant floor heating/cooling system is treated as virtual energy storage system (VESS, and an optimization model based on mixed-integer nonlinear programming (MINLP for r-microgrid scheduling is established which takes thermal comfort level and economy as the optimization objectives. Finally, the optimal scheduling results of two typical r-microgrids are analyzed. Case studies demonstrate that the proposed scheduling method can effectively employ the thermal storage capacity of radiant floor heating/cooling system, thus lowering the operating cost of the r-microgrid effectively while ensuring the thermal comfort level of users.

  9. A visual representation system for the scheduling and management of projects

    NARCIS (Netherlands)

    Pollalis, S.N.

    1992-01-01

    A VISUAL SCHEDULING AND MANAGEMENT SYSTEM (VSMS) This work proposes a new system for the visual representation of projects that displays the quantities of work, resources and cost. This new system, called Visual Scheduling and Management System, has a built-in hierarchical system to provide

  10. Improved SIRAP analysis for synchronization in hierarchical scheduled real-time systems

    NARCIS (Netherlands)

    Behnam, M.; Bril, R.J.; Nolte, T.

    2009-01-01

    We present our ongoing work on synchronization in hierarchical scheduled real-time systems, where tasks are scheduled using fixed-priority pre-emptive scheduling. In this paper, we show that the original local schedulability analysis of the synchronization protocol SIRAP [4] is very pessimistic when

  11. Throughput maximization of parcel sorter systems by scheduling inbound containers

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Schutten, Johannes M.J.; Fikse, K.; Clausen, Uwe; ten Hompel, Michael; Meier, J. Fabian

    2013-01-01

    This paper addresses the inbound container scheduling problem for automated sorter systems in express parcel sorting. The purpose is to analyze which container scheduling approaches maximize the throughput of sorter systems. We build on existing literature, particularly on the dynamic load balancing

  12. A decision support system for real-time hydropower scheduling in a competitive power market environment

    Science.gov (United States)

    Shawwash, Ziad Khaled Elias

    2000-10-01

    The electricity supply market is rapidly changing from a monopolistic to a competitive environment. Being able to operate their system of reservoirs and generating facilities to get maximum benefits out of existing assets and resources is important to the British Columbia Hydro Authority (B.C. Hydro). A decision support system has been developed to help B.C. Hydro operate their system in an optimal way. The system is operational and is one of the tools that are currently used by the B.C. Hydro system operations engineers to determine optimal schedules that meet the hourly domestic load and also maximize the value B.C. Hydro obtains from spot transactions in the Western U.S. and Alberta electricity markets. This dissertation describes the development and implementation of the decision support system in production mode. The decision support system consists of six components: the input data preparation routines, the graphical user interface (GUI), the communication protocols, the hydraulic simulation model, the optimization model, and the results display software. A major part of this work involved the development and implementation of a practical and detailed large-scale optimization model that determines the optimal tradeoff between the long-term value of water and the returns from spot trading transactions in real-time operations. The postmortem-testing phase showed that the gains in value from using the model accounted for 0.25% to 1.0% of the revenues obtained. The financial returns from using the decision support system greatly outweigh the costs of building it. Other benefits are the savings in the time needed to prepare the generation and trading schedules. The system operations engineers now can use the time saved to focus on other important aspects of their job. The operators are currently experimenting with the system in production mode, and are gradually gaining confidence that the advice it provides is accurate, reliable and sensible. The main lesson

  13. The role of the production scheduling system in rescheduling

    Science.gov (United States)

    Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.

    2015-11-01

    The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.

  14. Power Transmission Scheduling for Generators in a Deregulated Environment Based on a Game-Theoretic Approach

    Directory of Open Access Journals (Sweden)

    Bingtuan Gao

    2015-12-01

    Full Text Available In a deregulated environment of the power market, in order to lower their energy price and guarantee the stability of the power network, appropriate transmission lines have to be considered for electricity generators to sell their energy to the end users. This paper proposes a game-theoretic power transmission scheduling for multiple generators to lower their wheeling cost. Based on the embedded cost method, a wheeling cost model consisting of congestion cost, cost of losses and cost of transmission capacity is presented. By assuming each generator behaves in a selfish and rational way, the competition among the multiple generators is formulated as a non-cooperative game, where the players are the generators and the strategies are their daily schedules of power transmission. We will prove that there exists at least one pure-strategy Nash equilibrium of the formulated power transmission game. Moreover, a distributed algorithm will be provided to realize the optimization in terms of minimizing the wheeling cost. Finally, simulations were performed and discussed to verify the feasibility and effectiveness of the proposed non-cooperative game approach for the generators in a deregulated environment.

  15. 77 FR 42332 - Large Power Transformers From Korea; Revised Schedule for the Subject Investigation

    Science.gov (United States)

    2012-07-18

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1189 (Final)] Large Power Transformers From Korea; Revised Schedule for the Subject Investigation AGENCY: United States International Trade Commission. ACTION: Notice. DATES: Effective Date: July 12, 2012. FOR FURTHER INFORMATION CONTACT: Edward...

  16. Optimal Scheduling of Integrated Energy Systems with Combined Heat and Power Generation, Photovoltaic and Energy Storage Considering Battery Lifetime Loss

    Directory of Open Access Journals (Sweden)

    Yongli Wang

    2018-06-01

    Full Text Available Integrated energy systems (IESs are considered a trending solution for the energy crisis and environmental problems. However, the diversity of energy sources and the complexity of the IES have brought challenges to the economic operation of IESs. Aiming at achieving optimal scheduling of components, an IES operation optimization model including photovoltaic, combined heat and power generation system (CHP and battery energy storage is developed in this paper. The goal of the optimization model is to minimize the operation cost under the system constraints. For the optimization process, an optimization principle is conducted, which achieves maximized utilization of photovoltaic by adjusting the controllable units such as energy storage and gas turbine, as well as taking into account the battery lifetime loss. In addition, an integrated energy system project is taken as a research case to validate the effectiveness of the model via the improved differential evolution algorithm (IDEA. The comparison between IDEA and a traditional differential evolution algorithm shows that IDEA could find the optimal solution faster, owing to the double variation differential strategy. The simulation results in three different battery states which show that the battery lifetime loss is an inevitable factor in the optimization model, and the optimized operation cost in 2016 drastically decreased compared with actual operation data.

  17. Generic Formal Framework for Compositional Analysis of Hierarchical Scheduling Systems

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; Hyun Kim, Jin; Thi Xuan Phan, Linh

    We present a compositional framework for the specification and analysis of hierarchical scheduling systems (HSS). Firstly we provide a generic formal model, which can be used to describe any type of scheduling system. The concept of Job automata is introduced in order to model job instantiation...

  18. Time-critical multirate scheduling using contemporary real-time operating system services

    Science.gov (United States)

    Eckhardt, D. E., Jr.

    1983-01-01

    Although real-time operating systems provide many of the task control services necessary to process time-critical applications (i.e., applications with fixed, invariant deadlines), it may still be necessary to provide a scheduling algorithm at a level above the operating system in order to coordinate a set of synchronized, time-critical tasks executing at different cyclic rates. The scheduling requirements for such applications and develops scheduling algorithms using services provided by contemporary real-time operating systems.

  19. The Energy Cost Analysis of Hybrid Systems and Diesel Generators in Powering Selected Base Transceiver Station Locations in Nigeria

    Directory of Open Access Journals (Sweden)

    Peter Ozaveshe Oviroh

    2018-03-01

    Full Text Available As more locations gain access to telecommunication, there is a growing demand to provide energy in a reliable, efficient and environmentally friendly manner while effectively addressing growing energy needs. Erratic power supply and rising operation costs (OPEX in Nigeria have increased the need to harness local renewable energy sources. Thus, identifying the right generator schedule with the renewable system to reduce OPEX is a priority for operators and vendors. This study evaluates the energy costs of hybrid systems with different generator schedules in powering base transceiver stations in Nigeria using the Hybrid Optimization Model for Electric Renewable (HOMER. A load range of 4 kW to 8 kW was considered using: (i an optimised generator schedule; (ii forced-on generator schedule and (iii the generator-only schedule. The results showed an optimal LCOE range between averages of USD 0.156/kWh to 0.172/kWh for the 8 kW load. The percent energy contribution by generator ranges from 52.80% to 60.90%, and by the solar PV system, 39.10% to 47.20%. Excess energy ranges from 0.03% to 14.98%. The optimised generator schedule has the highest solar PV penetration of 56.8%. The OPEX savings on fuel ranges from 41.68% to 47% for the different load schedules and carbon emission savings of 4222 kg to 31,428.36 kg. The simulation results shows that powering base stations using the optimised hybrid system schedule would be a better option for the telecom industry.

  20. Utilization of artificial intelligence techniques for the Space Station power system

    Science.gov (United States)

    Evatt, Thomas C.; Gholdston, Edward W.

    1988-01-01

    Due to the complexity of the Space Station Electrical Power System (EPS) as currently envisioned, artificial intelligence/expert system techniques are being investigated to automate operations, maintenance, and diagnostic functions. A study was conducted to investigate this technology as it applies to failure detection, isolation, and reconfiguration (FDIR) and health monitoring of power system components and of the total system. Control system utilization of expert systems for load scheduling and shedding operations was also researched. A discussion of the utilization of artificial intelligence/expert systems for Initial Operating Capability (IOC) for the Space Station effort is presented along with future plans at Rocketdyne for the utilization of this technology for enhanced Space Station power capability.

  1. Application of point system in the project control of Ling'ao Nuclear Power Station

    International Nuclear Information System (INIS)

    Xie ahai

    2005-01-01

    Schedule control and cost control are very complicated issues even we set up the detail schedules and engineering measurements requirements for erection of a nuclear power project. In order to solve these problems, a Point System is used in Ling Ao (LA) Nuclear Power Project. This paper introduces the method. The Point System is a measurement system of workload. The measurement unit of any erection works is a Point only. A Point of workload is defined as the equivalent measurement quantities, which could be completed by a relevant skill worker within an hour. A set of procedure manuals for different installations has been set up. The calculation models of equipment installation, piping, cabling are addressed for example in the paper. The application of the Point System in the schedule control is shown in the paper. The following issues are highlighted: to define the duration of a piping activity in the Project Level 2 Schedule, to draught the curves of Point Schedules for different erection fields, to analyze the productive efficiency, to define erection quota of each month for different erection teams, to follow up the erection progress on site. The application of the Point System in the payment of erection contract is outlined. The calculation formula of a monthly payment is given. The advantage of the payment calculation method is discussed, for example, more accurate, very easy and clearly to check the measurement quantities completed on site, to control lump-sum cost. (authors)

  2. Online scheduling of 2-re-entrant flexible manufacturing systems

    NARCIS (Netherlands)

    Pinxten, J. van; Waqas, U.; Geilen, M.; Basten, T.; Somers, L.

    2017-01-01

    Online scheduling of operations is essential to optimize productivity of flexible manufacturing systems (FMSs) where manufacturing requests arrive on the fly. An FMS processes products according to a particular flow through processing stations. This work focusses on online scheduling of re-entrant

  3. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    Science.gov (United States)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  4. Short-term hydro-thermal-wind complementary scheduling considering uncertainty of wind power using an enhanced multi-objective bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Zhou, Jianzhong; Lu, Peng; Li, Yuanzheng; Wang, Chao; Yuan, Liu; Mo, Li

    2016-01-01

    Highlights: • HTWCS system is established while considering uncertainty of wind power. • An enhanced multi-objective bee colony optimization algorithm is proposed. • Some heuristic repairing strategies are designed to handle various constraints. • HTWCS problem with economic/environment objectives is solved by EMOBCO. - Abstract: This paper presents a short-term economic/environmental hydro-thermal-wind complementary scheduling (HTWCS) system considering uncertainty of wind power, as well as various complicated non-linear constraints. HTWCS system is formulated as a multi-objective optimization problem to optimize conflictive objectives, i.e., economic and environmental criteria. Then an enhanced multi-objective bee colony optimization algorithm (EMOBCO) is proposed to solve this problem, which adopts Elite archive set, adaptive mutation/selection mechanism and local searching strategy to improve global searching ability of standard bee colony optimization (BCO). Especially, a novel constraints-repairing strategy with compressing decision space and a violation-adjustment method are used to handle various hydraulic and electric constraints. Finally, a daily scheduling simulation case of hydro-thermal-wind system is conducted to verify feasibility and effectiveness of the proposed EMOBCO in solving HTWCS problem. The simulation results indicate that the proposed EMOBCO can provide lower economic cost and smaller pollutant emission than other method established recently while considering various complex constraints in HTWCS problem.

  5. Concept of Indoor 3D-Route UAV Scheduling System

    DEFF Research Database (Denmark)

    Khosiawan, Yohanes; Nielsen, Izabela Ewa; Do, Ngoc Ang Dung

    2016-01-01

    environment. On top of that, the multi-source productive best-first-search concept also supports efficient real-time scheduling in response to uncertain events. Without human intervention, the proposed work provides an automatic scheduling system for UAV routing problem in 3D indoor environment....

  6. Optimal hydro scheduling and offering strategies considering price uncertainty and risk management

    International Nuclear Information System (INIS)

    Catalão, J.P.S.; Pousinho, H.M.I.; Contreras, J.

    2012-01-01

    Hydro energy represents a priority in the energy policy of Portugal, with the aim of decreasing the dependence on fossil fuels. In this context, optimal hydro scheduling acquires added significance in moving towards a sustainable environment. A mixed-integer nonlinear programming approach is considered to enable optimal hydro scheduling for the short-term time horizon, including the effect of head on power production, start-up costs related to the units, multiple regions of operation, and constraints on discharge variation. As new contributions to the field, market uncertainty is introduced in the model via price scenarios and risk management is included using Conditional Value-at-Risk to limit profit volatility. Moreover, plant scheduling and pool offering by the hydro power producer are simultaneously considered to solve a realistic cascaded hydro system. -- Highlights: ► A mixed-integer nonlinear programming approach is considered for optimal hydro scheduling. ► Market uncertainty is introduced in the model via price scenarios. ► Risk management is included using conditional value-at-risk. ► Plant scheduling and pool offering by the hydro power producer are simultaneously considered. ► A realistic cascaded hydro system is solved.

  7. Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael CW; Balducci, Patrick J.; Jin, Chunlian; Nguyen, Tony B.; Elizondo, Marcelo A.; Viswanathan, Vilayanur V.; Guo, Xinxin; Tuffner, Francis K.

    2010-04-01

    Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

  8. Geometric Distribution-Based Readers Scheduling Optimization Algorithm Using Artificial Immune System

    Directory of Open Access Journals (Sweden)

    Litian Duan

    2016-11-01

    Full Text Available In the multiple-reader environment (MRE of radio frequency identification (RFID system, multiple readers are often scheduled to interrogate the randomized tags via operating at different time slots or frequency channels to decrease the signal interferences. Based on this, a Geometric Distribution-based Multiple-reader Scheduling Optimization Algorithm using Artificial Immune System (GD-MRSOA-AIS is proposed to fairly and optimally schedule the readers operating from the viewpoint of resource allocations. GD-MRSOA-AIS is composed of two parts, where a geometric distribution function combined with the fairness consideration is first introduced to generate the feasible scheduling schemes for reader operation. After that, artificial immune system (including immune clone, immune mutation and immune suppression quickly optimize these feasible ones as the optimal scheduling scheme to ensure that readers are fairly operating with larger effective interrogation range and lower interferences. Compared with the state-of-the-art algorithm, the simulation results indicate that GD-MRSOA-AIS could efficiently schedules the multiple readers operating with a fairer resource allocation scheme, performing in larger effective interrogation range.

  9. Coordinated Volt/Var Control in Distribution Systems with Distributed Generations Based on Joint Active and Reactive Powers Dispatch

    Directory of Open Access Journals (Sweden)

    Abouzar Samimi

    2016-01-01

    Full Text Available One of the most significant control schemes in optimal operation of distribution networks is Volt/Var control (VVC. Owing to the radial structure of distribution systems and distribution lines with a small X/R ratio, the active power scheduling affects the VVC issue. A Distribution System Operator (DSO procures its active and reactive power requirements from Distributed Generations (DGs along with the wholesale electricity market. This paper proposes a new operational scheduling method based on a joint day-ahead active/reactive power market at the distribution level. To this end, based on the capability curve, a generic reactive power cost model for DGs is developed. The joint active/reactive power dispatch model presented in this paper motivates DGs to actively participate not only in the energy markets, but also in the VVC scheme through a competitive market. The proposed method which will be performed in an offline manner aims to optimally determine (i the scheduled active and reactive power values of generation units; (ii reactive power values of switched capacitor banks; and (iii tap positions of transformers for the next day. The joint active/reactive power dispatch model for daily VVC is modeled in GAMS and solved with the DICOPT solver. Finally, the plausibility of the proposed scheduling framework is examined on a typical 22-bus distribution test network over a 24-h period.

  10. Review on the application of system engineer model in nuclear power plant

    International Nuclear Information System (INIS)

    Chen Guocai

    2005-01-01

    system engineer was adopted deeply and play important roles in nuclear power plants in United States and Canada, the plant performance indicates that system engineer mode is a good practice. Qinshan CANDU nuclear power plant, established the system engineer mode since commissioning, as a core, system engineer took charge of the preparation of commissioning procedures, organization, coordination and guidance of commissioning execution. Unit 1 was put into commercial operation 43 days in advance and 112 days ahead of schedule for Unit 2 with excellent quality. Commissioning period are just 10.5 and 7.8 months for both Units respectively. Which is the shortest record in the history of CANDU nuclear power plant commissioning up to now. During operation, systems engineer has strength in routine operating and units reliability improvement. Based on the practice of Qinshan CANDU nuclear power plant commissioning and production technical management, the main form of the article in the era of knowledge: its characteristics and advantage and operating mode of the system engineer mode. System engineer is different from project engineer, he act as the master of systems and takes full responsibility for systems technical management. System engineer should do many jobs and improvement schedule to ensure his system in health status. System health monitor is a basic tool in system management, which is useful for equipment performance improvement. At last, the author made a forecast and comment on the prospects for the system engineer in the future. (author)

  11. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2006-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays proposing four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments...

  12. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays proposing four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments....

  13. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2004-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays with four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments....

  14. Minimization of Load Variance in Power Grids—Investigation on Optimal Vehicle-to-Grid Scheduling

    Directory of Open Access Journals (Sweden)

    Kang Miao Tan

    2017-11-01

    Full Text Available The introduction of electric vehicles into the transportation sector helps reduce global warming and carbon emissions. The interaction between electric vehicles and the power grid has spurred the emergence of a smart grid technology, denoted as vehicle-to grid-technology. Vehicle-to-grid technology manages the energy exchange between a large fleet of electric vehicles and the power grid to accomplish shared advantages for the vehicle owners and the power utility. This paper presents an optimal scheduling of vehicle-to-grid using the genetic algorithm to minimize the power grid load variance. This is achieved by allowing electric vehicles charging (grid-to-vehicle whenever the actual power grid loading is lower than the target loading, while conducting electric vehicle discharging (vehicle-to-grid whenever the actual power grid loading is higher than the target loading. The vehicle-to-grid optimization algorithm is implemented and tested in MATLAB software (R2013a, MathWorks, Natick, MA, USA. The performance of the optimization algorithm depends heavily on the setting of the target load, power grid load and capability of the grid-connected electric vehicles. Hence, the performance of the proposed algorithm under various target load and electric vehicles’ state of charge selections were analysed. The effectiveness of the vehicle-to-grid scheduling to implement the appropriate peak load shaving and load levelling services for the grid load variance minimization is verified under various simulation investigations. This research proposal also recommends an appropriate setting for the power utility in terms of the selection of the target load based on the electric vehicle historical data.

  15. The Application of Artificial Intelligence to Astronomical Scheduling Problems

    Science.gov (United States)

    Johnston, Mark D.

    1993-01-01

    As artificial intelligence (AI) technology has moved from the research laboratory into more and more widespread use, one of the leading applications in astronomy has been to high-profile observation scheduling. The Spike scheduling system was developed by the Space Telescope Science Institute (STScI) for the purpose of long-range scheduling of Hubble Space Telescope (HST). Spike has been in daily operational use at STScI since well before HST launch in April 1990. The system has also been adapted to schedule other missions: one of these missions (EUVE) is currently operational, while another (ASTRO-D) will be launched in February 1993. Some other future space astronomy missions (XTE, SWAS, and AXAF) are making tentative plans to use Spike. Spike has proven to be a powerful and flexible scheduling framework with applicability to a wide variety of problems.

  16. Uplink Packet-Data Scheduling in DS-CDMA Systems

    Science.gov (United States)

    Choi, Young Woo; Kim, Seong-Lyun

    In this letter, we consider the uplink packet scheduling for non-real-time data users in a DS-CDMA system. As an effort to jointly optimize throughput and fairness, we formulate a time-span minimization problem incorporating the time-multiplexing of different simultaneous transmission schemes. Based on simple rules, we propose efficient scheduling algorithms and compare them with the optimal solution obtained by linear programming.

  17. Optimal scheduling for distributed hybrid system with pumped hydro storage

    International Nuclear Information System (INIS)

    Kusakana, Kanzumba

    2016-01-01

    Highlights: • Pumped hydro storage is proposed for isolated hybrid PV–Wind–Diesel systems. • Optimal control is developed to dispatch power flow economically. • A case study is conducted using the model for an isolated load. • Effects of seasons on the system’s optimal scheduling are examined through simulation. - Abstract: Photovoltaic and wind power generations are currently seen as sustainable options of in rural electrification, particularly in standalone applications. However the variable character of solar and wind resources as well as the variable load demand prevent these generation systems from being totally reliable without suitable energy storage system. Several research works have been conducted on the use of photovoltaic and wind systems in rural electrification; however most of these works have not considered other ways of storing energy except for conventional battery storage systems. In this paper, an energy dispatch model that satisfies the load demand, taking into account the intermittent nature of the solar and wind energy sources and variations in demand, is presented for a hybrid system consisting of a photovoltaic unit, a wind unit, a pumped hydro storage system and a diesel generator. The main purpose of the developed model is to minimize the hybrid system’s operation cost while optimizing the system’s power flow considering the different component’s operational constraints. The simulations have been performed using “fmincon” implemented in Matlab. The model have been applied to two test examples; the simulation results are analyzed and compared to the case where the diesel generator is used alone to supply the given load demand. The results show that using the developed control model for the proposed hybrid system, fuel saving can be achieved compared to the case where the diesel is used alone to supply the same load patters.

  18. Car painting process scheduling with harmony search algorithm

    Science.gov (United States)

    Syahputra, M. F.; Maiyasya, A.; Purnamawati, S.; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Automotive painting program in the process of painting the car body by using robot power, making efficiency in the production system. Production system will be more efficient if pay attention to scheduling of car order which will be done by considering painting body shape of car. Flow shop scheduling is a scheduling model in which the job-job to be processed entirely flows in the same product direction / path. Scheduling problems often arise if there are n jobs to be processed on the machine, which must be specified which must be done first and how to allocate jobs on the machine to obtain a scheduled production process. Harmony Search Algorithm is a metaheuristic optimization algorithm based on music. The algorithm is inspired by observations that lead to music in search of perfect harmony. This musical harmony is in line to find optimal in the optimization process. Based on the tests that have been done, obtained the optimal car sequence with minimum makespan value.

  19. Dynamic Modeling and Simulation on a Hybrid Power System for Electric Vehicle Applications

    Directory of Open Access Journals (Sweden)

    Hong-Wen He

    2010-11-01

    Full Text Available Hybrid power systems, formed by combining high-energy-density batteries and high-power-density ultracapacitors in appropriate ways, provide high-performance and high-efficiency power systems for electric vehicle applications. This paper first establishes dynamic models for the ultracapacitor, the battery and a passive hybrid power system, and then based on the dynamic models a comparative simulation between a battery only power system and the proposed hybrid power system was done under the UDDS (Urban Dynamometer Driving Schedule. The simulation results showed that the hybrid power system could greatly optimize and improve the efficiency of the batteries and their dynamic current was also decreased due to the participation of the ultracapacitors, which would have a good influence on batteries’ cycle life. Finally, the parameter matching for the passive hybrid power system was studied by simulation and comparisons.

  20. Model Predictive Control of a Nonlinear System with Known Scheduling Variable

    DEFF Research Database (Denmark)

    Mirzaei, Mahmood; Poulsen, Niels Kjølstad; Niemann, Hans Henrik

    2012-01-01

    Model predictive control (MPC) of a class of nonlinear systems is considered in this paper. We will use Linear Parameter Varying (LPV) model of the nonlinear system. By taking the advantage of having future values of the scheduling variable, we will simplify state prediction. Consequently...... the control problem of the nonlinear system is simplied into a quadratic programming. Wind turbine is chosen as the case study and we choose wind speed as the scheduling variable. Wind speed is measurable ahead of the turbine, therefore the scheduling variable is known for the entire prediction horizon....

  1. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    Science.gov (United States)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  2. Uplink Cross-Layer Scheduling with Differential QoS Requirements in OFDMA Systems

    Directory of Open Access Journals (Sweden)

    Chen Wei

    2010-01-01

    Full Text Available Fair and efficient scheduling is a key issue in cross-layer design for wireless communication systems, such as 3GPP LTE and WiMAX. However, few works have considered the multiaccess of the traffic with differential QoS requirements in wireless systems. In this paper, we will consider an OFDMA-based wireless system with four types of traffic associated with differential QoS requirements, namely, minimum reserved rate, maximum sustainable rate, maximum latency, and tolerant jitter. Given these QoS requirements, the traffic scheduling will be formulated into a cross-layer optimization problem, which is convex fortunately. By separating the power allocation through the waterfilling algorithm in each user, this problem will further reduce to a kind of continuous quadratic knapsack problem in the base station which yields low complexity. It is then demonstrated that the proposed cross-layer method cannot only guarantee the application layer QoS requirements, but also minimizes the integrated residual workload in the MAC layer. To further enhance the ability of QoS assurance in heavily loaded scenario, a call admission control scheme will also be proposed. The simulation results show that the QoS requirements for the four types of traffic are guaranteed effectively by the proposed algorithms.

  3. Risk-constrained self-scheduling of a fuel and emission constrained power producer using rolling window procedure

    International Nuclear Information System (INIS)

    Kazempour, S. Jalal; Moghaddam, Mohsen Parsa

    2011-01-01

    This work addresses a relevant methodology for self-scheduling of a price-taker fuel and emission constrained power producer in day-ahead correlated energy, spinning reserve and fuel markets to achieve a trade-off between the expected profit and the risk versus different risk levels based on Markowitz's seminal work in the area of portfolio selection. Here, a set of uncertainties including price forecasting errors and available fuel uncertainty are considered. The latter uncertainty arises because of uncertainties in being called for reserve deployment in the spinning reserve market and availability of power plant. To tackle the price forecasting errors, variances of energy, spinning reserve and fuel prices along with their covariances which are due to markets correlation are taken into account using relevant historical data. In order to tackle available fuel uncertainty, a framework for self-scheduling referred to as rolling window is proposed. This risk-constrained self-scheduling framework is therefore formulated and solved as a mixed-integer non-linear programming problem. Furthermore, numerical results for a case study are discussed. (author)

  4. Multiuser Scheduling on the Downlink of an LTE Cellular System

    Directory of Open Access Journals (Sweden)

    Raymond Kwan

    2008-01-01

    Full Text Available The challenge of scheduling user transmissions on the downlink of a long-term evolution (LTE cellular communication system is addressed. In particular, a novel optimalmultiuser scheduler is proposed. Numerical results show that the system performance improves with increasing correlation among OFDMA subcarriers. It is found that only a limited amount of feedback information is needed to achieve relatively good performance. A suboptimal reduced-complexity scheduler is also proposed and shown to provide good performance. The suboptimal scheme is especially attractive when the number of users is large, in which case the complexity of the optimal scheme is high.

  5. Power Minimization for Parallel Real-Time Systems with Malleable Jobs and Homogeneous Frequencies

    OpenAIRE

    Paolillo, Antonio; Goossens, Joël; Hettiarachchi, Pradeep M.; Fisher, Nathan

    2014-01-01

    In this work, we investigate the potential benefit of parallelization for both meeting real-time constraints and minimizing power consumption. We consider malleable Gang scheduling of implicit-deadline sporadic tasks upon multiprocessors. By extending schedulability criteria for malleable jobs to DVFS-enabled multiprocessor platforms, we are able to derive an offline polynomial-time optimal processor/frequency-selection algorithm. Simulations of our algorithm on randomly generated task system...

  6. An EV Charging Scheduling Mechanism Based on Price Negotiation

    Directory of Open Access Journals (Sweden)

    Baocheng Wang

    2018-05-01

    Full Text Available Scheduling EV user’s charging behavior based on charging price and applying renewable energy resources are the effective methods to release the load pressure of power grids brought about by the large-scale popularity of electric vehicles (EVs. This paper presents a novel approach for EV charging scheduling based on price negotiation. Firstly, the EV charging system framework based on price negotiation and renewable energy resources is discussed. Secondly, the price negotiation model is presented, including the initial price models and the conditions of transactions. Finally, an EV charging scheduling mechanism based on price negotiation (CSM-PN, including the price adjustment strategies of both the operator and EV users is proposed to seek a final transaction during multi-round price negotiation. Simulation results show that this novel approach can effectively improve the charging station operator’s income, reduce the EV users’ costs, and balance the load of the power grid while improving the efficiency of the EV charging system.

  7. Coordinated scheduling for dynamic real-time systems

    Science.gov (United States)

    Natarajan, Swaminathan; Zhao, Wei

    1994-01-01

    In this project, we addressed issues in coordinated scheduling for dynamic real-time systems. In particular, we concentrated on design and implementation of a new distributed real-time system called R-Shell. The design objective of R-Shell is to provide computing support for space programs that have large, complex, fault-tolerant distributed real-time applications. In R-shell, the approach is based on the concept of scheduling agents, which reside in the application run-time environment, and are customized to provide just those resource management functions which are needed by the specific application. With this approach, we avoid the need for a sophisticated OS which provides a variety of generalized functionality, while still not burdening application programmers with heavy responsibility for resource management. In this report, we discuss the R-Shell approach, summarize the achievement of the project, and describe a preliminary prototype of R-Shell system.

  8. A new distributed systems scheduling algorithm: a swarm intelligence approach

    Science.gov (United States)

    Haghi Kashani, Mostafa; Sarvizadeh, Raheleh; Jameii, Mahdi

    2011-12-01

    The scheduling problem in distributed systems is known as an NP-complete problem, and methods based on heuristic or metaheuristic search have been proposed to obtain optimal and suboptimal solutions. The task scheduling is a key factor for distributed systems to gain better performance. In this paper, an efficient method based on memetic algorithm is developed to solve the problem of distributed systems scheduling. With regard to load balancing efficiently, Artificial Bee Colony (ABC) has been applied as local search in the proposed memetic algorithm. The proposed method has been compared to existing memetic-Based approach in which Learning Automata method has been used as local search. The results demonstrated that the proposed method outperform the above mentioned method in terms of communication cost.

  9. Distributed energy systems with wind power and energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Korpaas, Magnus

    2004-07-01

    compare different storage solutions. In chapter 5, energy storage is evaluated as an alternative for increasing the value of wind power in a market-based power system. A method for optimal short-term scheduling of wind power with energy storage has been developed. The basic model employs a dynamic programming algorithm for the scheduling problem. Moreover, different variants of the scheduling problem based on linear programming are presented. During on-line operation, the energy storage is operated to minimize the deviation between the generation schedule and the actual power output of the wind-storage system. It is shown how stochastic dynamic programming can be applied for the on-line operation problem by explicitly taking into account wind forecast uncertainty. The model presented in chapter 6 extends and improves the linear programming model described in chapter 5. An operation strategy based on model predictive control is developed for effective management of uncertainties. The method is applied in a simulation model of a wind-hydrogen system that supplies the local demand for electricity and hydrogen. Utilization of fuel cell heat and electrolytic oxygen as by-products is also considered. Computer simulations show that the developed operation method is beneficial for grid-connected as well as for isolated systems. For isolated systems, the method makes it possible to minimize the usage of backup power and to ensure a secure supply of hydrogen fuel. For grid-connected wind-hydrogen systems, the method could be applied for maximizing the profit from operating in an electricity market. Comprehensive simulation studies of different example systems have been carried out to obtain knowledge about the benefits and limitations of using energy storage in conjunction with wind power. In order to exploit the opportunities for energy storage in electricity markets, it is crucial that the electrical efficiency of the storage is as high as possible. Energy storage combined with

  10. The R-Shell approach - Using scheduling agents in complex distributed real-time systems

    Science.gov (United States)

    Natarajan, Swaminathan; Zhao, Wei; Goforth, Andre

    1993-01-01

    Large, complex real-time systems such as space and avionics systems are extremely demanding in their scheduling requirements. The current OS design approaches are quite limited in the capabilities they provide for task scheduling. Typically, they simply implement a particular uniprocessor scheduling strategy and do not provide any special support for network scheduling, overload handling, fault tolerance, distributed processing, etc. Our design of the R-Shell real-time environment fcilitates the implementation of a variety of sophisticated but efficient scheduling strategies, including incorporation of all these capabilities. This is accomplished by the use of scheduling agents which reside in the application run-time environment and are responsible for coordinating the scheduling of the application.

  11. A Two-Stage Stochastic Mixed-Integer Programming Approach to the Smart House Scheduling Problem

    Science.gov (United States)

    Ozoe, Shunsuke; Tanaka, Yoichi; Fukushima, Masao

    A “Smart House” is a highly energy-optimized house equipped with photovoltaic systems (PV systems), electric battery systems, fuel cell cogeneration systems (FC systems), electric vehicles (EVs) and so on. Smart houses are attracting much attention recently thanks to their enhanced ability to save energy by making full use of renewable energy and by achieving power grid stability despite an increased power draw for installed PV systems. Yet running a smart house's power system, with its multiple power sources and power storages, is no simple task. In this paper, we consider the problem of power scheduling for a smart house with a PV system, an FC system and an EV. We formulate the problem as a mixed integer programming problem, and then extend it to a stochastic programming problem involving recourse costs to cope with uncertain electricity demand, heat demand and PV power generation. Using our method, we seek to achieve the optimal power schedule running at the minimum expected operation cost. We present some results of numerical experiments with data on real-life demands and PV power generation to show the effectiveness of our method.

  12. The DEEP-South: Scheduling and Data Reduction Software System

    Science.gov (United States)

    Yim, Hong-Suh; Kim, Myung-Jin; Bae, Youngho; Moon, Hong-Kyu; Choi, Young-Jun; Roh, Dong-Goo; the DEEP-South Team

    2015-08-01

    The DEep Ecliptic Patrol of the Southern sky (DEEP-South), started in October 2012, is currently in test runs with the first Korea Microlensing Telescope Network (KMTNet) 1.6 m wide-field telescope located at CTIO in Chile. While the primary objective for the DEEP-South is physical characterization of small bodies in the Solar System, it is expected to discover a large number of such bodies, many of them previously unknown.An automatic observation planning and data reduction software subsystem called "The DEEP-South Scheduling and Data reduction System" (the DEEP-South SDS) is currently being designed and implemented for observation planning, data reduction and analysis of huge amount of data with minimum human interaction. The DEEP-South SDS consists of three software subsystems: the DEEP-South Scheduling System (DSS), the Local Data Reduction System (LDR), and the Main Data Reduction System (MDR). The DSS manages observation targets, makes decision on target priority and observation methods, schedules nightly observations, and archive data using the Database Management System (DBMS). The LDR is designed to detect moving objects from CCD images, while the MDR conducts photometry and reconstructs lightcurves. Based on analysis made at the LDR and the MDR, the DSS schedules follow-up observation to be conducted at other KMTNet stations. In the end of 2015, we expect the DEEP-South SDS to achieve a stable operation. We also have a plan to improve the SDS to accomplish finely tuned observation strategy and more efficient data reduction in 2016.

  13. An Optimization Model for Large–Scale Wind Power Grid Connection Considering Demand Response and Energy Storage Systems

    Directory of Open Access Journals (Sweden)

    Zhongfu Tan

    2014-11-01

    Full Text Available To reduce the influence of wind power output uncertainty on power system stability, demand response (DRPs and energy storage systems (ESSs are introduced while solving scheduling optimization problems. To simulate wind power scenarios, this paper uses Latin Hypercube Sampling (LHS to generate the initial scenario set and constructs a scenario reduction strategy based on Kantorovich distance. Since DRPs and ESSs can influence the distribution of demand load, this paper constructs a joint scheduling optimization model for wind power, ESSs and DRPs under the objective of minimizing total coal cost, and constraints of power demand and supply balance, users’ demand elasticity, thermal units’ startup-shutdown, thermal units’ output power climbing and wind power backup service. To analyze the influences of ESSs and DRPs on system wind power consumption capacity, example simulation is made in a 10 thermal units system with a 1000 MW wind farm and 400 MW energy storage systems under four simulation scenarios. The simulation results show that the introduction of DRPs and ESSs could promote system wind power consumption capacity with significantly economic and environment benefits, which include less coal consumption and less pollutant emission; and the optimization effect reaches the optimum when DRPs and ESSs are both introduced.

  14. Two-Stage Multi-Objective Collaborative Scheduling for Wind Farm and Battery Switch Station

    Directory of Open Access Journals (Sweden)

    Zhe Jiang

    2016-10-01

    Full Text Available In order to deal with the uncertainties of wind power, wind farm and electric vehicle (EV battery switch station (BSS were proposed to work together as an integrated system. In this paper, the collaborative scheduling problems of such a system were studied. Considering the features of the integrated system, three indices, which include battery swapping demand curtailment of BSS, wind curtailment of wind farm, and generation schedule tracking of the integrated system are proposed. In addition, a two-stage multi-objective collaborative scheduling model was designed. In the first stage, a day-ahead model was built based on the theory of dependent chance programming. With the aim of maximizing the realization probabilities of these three operating indices, random fluctuations of wind power and battery switch demand were taken into account simultaneously. In order to explore the capability of BSS as reserve, the readjustment process of the BSS within each hour was considered in this stage. In addition, the stored energy rather than the charging/discharging power of BSS during each period was optimized, which will provide basis for hour-ahead further correction of BSS. In the second stage, an hour-ahead model was established. In order to cope with the randomness of wind power and battery swapping demand, the proposed hour-ahead model utilized ultra-short term prediction of the wind power and the battery switch demand to schedule the charging/discharging power of BSS in a rolling manner. Finally, the effectiveness of the proposed models was validated by case studies. The simulation results indicated that the proposed model could realize complement between wind farm and BSS, reduce the dependence on power grid, and facilitate the accommodation of wind power.

  15. Application of coupled symbolic and numeric processing to an advanced scheduling system for plant construction

    International Nuclear Information System (INIS)

    Kobayashi, Yasuhiro; Takamoto, Masanori; Nonaka, Hisanori; Yamada, Naoyuki

    1994-01-01

    A scheduling system has been developed by integrating symbolic processing functions for constraint handling and modification guidance, with numeric processing functions for schedule optimization and evaluation. The system is composed of an automatic schedule generation module, interactive schedule revision module and schedule evaluation module. The goal of the problem solving is the flattening of the daily resources requirement throughout the scheduling period. The automatic schedule generation module optimizes the initial schedule according to the formulatable portion of requirement description specified in a predicate-like language. A planning engineer refines the near-goal schedule through a knowledge-based interactive optimization process to obtain the goal schedule which fully covers the requirement description, with the interactive schedule revision module and schedule evaluation module. A scheduling system has been implemented on the basis of the proposed problem solving framework and experimentally applied to real-world sized scheduling problems for plant construction. With a result of the overall plant construction scheduling, a section schedule optimization process is described with the emphasis on the symbolic processing functions. (author)

  16. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  17. Schedulability-Driven Frame Packing for Multi-Cluster Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2003-01-01

    We present an approach to frame packing for multi-cluster distributed embedded systems consisting of time-triggered and event-triggered clusters, interconnected via gateways. In our approach, the application messages are packed into frames such that the application is schedulable. Thus, we have...... also proposed a schedulability analysis for applications consisting of mixed event-triggered and time-triggered processes and messages, and a worst case queuing delay analysis for the gateways, responsible for routing inter-cluster traffic. Optimization heuristics for frame packing aiming at producing...... a schedulable system have been proposed. Extensive experiments and a real-life example show the efficiency of our frame-packing approach....

  18. Influence of renewable sources of energy on the operation of the production capacity in electrical power systems

    International Nuclear Information System (INIS)

    Nikolova-Potseva, Sofija

    2012-01-01

    In the PhD dissertation an approach for solving the generation scheduling problem between conventional power plants in a complex power system with integrated wind power plants is presented. The system that is analyzed is composed of thermal power plants, storage hydro power plants, pumped-storage hydro power plants, additional systems to deal with pumping water of pumped-storage hydro power plants and wind power plants. The model takes into consideration thermal power plants with and without contracted energy production over the study period. The objective of the generation scheduling problem in such a hybrid system is to determine the optimal amounts of generation power of conventional power plants over the study period, so that the total production costs of thermal power plants and additional units engaged for pumping water of pumped-storage hydro power plants be minimal and be satisfied the relevant real operational constraints of the system. The problem model takes into account the following constraints: power balance equations, constraints resulting from power output limits of thermal and hydro power plants, balance equations for contracted energy for thermal power plants with contracted energy production, power output limits of wind energy system and balance equations for available volume of water of storage hydro power plants and pumped-storage hydro power plants over the study period. The proposed model for power plant optimal operation does not take into account the system configuration and network losses. The computer program is developed in Matlab, in order to verify the proposed method for solving the optimal generation scheduling of conventional power plants in complex power system with integrated wind power plants. The developed computer program has been applied to specific systems and different variants of systems with integrated wind power plants have been analyzed. Particular problem in the operation of the power system is suppressed energy towards

  19. Improving the performance of sorter systems by scheduling inbound containers

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Schutten, Johannes M.J.; Fikse, K.

    2013-01-01

    This paper addresses the inbound containers scheduling problem for automated sorter systems in two different industrial sectors: parcel & postal sorting and baggage handling. We build on existing literature, particularly on the dynamic load balancing algorithm designed for the parcel hub scheduling

  20. Schedule for Rating Disabilities; the Endocrine System. Final rule.

    Science.gov (United States)

    2017-11-02

    This document amends the Department of Veterans Affairs (VA) Schedule for Rating Disabilities (VASRD) by revising the portion of the Schedule that addresses endocrine conditions and disorders of the endocrine system. The effect of this action is to ensure that the VASRD uses current medical terminology and to provide detailed and updated criteria for evaluation of endocrine disorders.

  1. Development of a coordinated control system for BWR nuclear power plant and HVDC transmission system

    International Nuclear Information System (INIS)

    Ishikawa, M.; Hara, T.; Hirayama, K.; Sekiya, K.

    1986-01-01

    The combined use of dc and ac transmissions or so-called hybrid transmission was under study, employing both dc and ac systems to enable stable transmission of 10,000 MW of electric power generated by the BWR nuclear plant, scheduled to be built about 800 km away from the center of the load. It was thus necessary to develop a hybrid power transmission control system, the hybrid power transmission system consisting of a high voltage dc transmission system (HVDC) and an ultrahigh ac transmission system (UHVAC). It was also necessary to develop a control system for HVDC transmission which protects the BWR nuclear power plant from being influenced by any change in transmission mode that occurs as a result of faults on the UHVAC side when the entire power of the BWR plant is being sent by the HVDC transmission. This paper clarifies the requirements for the HVDC system control during hybrid transmission and also during dc transmission. The control method that satisfies these requirements was studied to develop a control algorithm

  2. Stochastic analysis of residential micro combined heat and power system

    International Nuclear Information System (INIS)

    Karami, H.; Sanjari, M.J.; Gooi, H.B.; Gharehpetian, G.B.; Guerrero, J.M.

    2017-01-01

    Highlights: • Applying colonial competitive algorithm to the problem of optimal dispatching. • Economic modeling of the residential integrated energy system. • Investigating differences of stand-alone and system-connected modes of fuel cell operation. • Considering uncertainty on the electrical load. • The effects of battery capacity and its efficiency on the system is investigated. - Abstract: In this paper the combined heat and power functionality of a fuel-cell in a residential hybrid energy system, including a battery, is studied. The demand uncertainties are modeled by investigating the stochastic load behavior by applying Monte Carlo simulation. The colonial competitive algorithm is adopted to the hybrid energy system scheduling problem and different energy resources are optimally scheduled to have optimal operating cost of hybrid energy system. In order to show the effectiveness of the colonial competitive algorithm, the results are compared with the results of the harmony search algorithm. The optimized scheduling of different energy resources is listed in an efficient look-up table for all time intervals. The effects of time of use and the battery efficiency and its size are investigated on the operating cost of the hybrid energy system. The results of this paper are expected to be used effectively in a real hybrid energy system.

  3. Proportional fair scheduling algorithm based on traffic in satellite communication system

    Science.gov (United States)

    Pan, Cheng-Sheng; Sui, Shi-Long; Liu, Chun-ling; Shi, Yu-Xin

    2018-02-01

    In the satellite communication network system, in order to solve the problem of low system capacity and user fairness in multi-user access to satellite communication network in the downlink, combined with the characteristics of user data service, an algorithm study on throughput capacity and user fairness scheduling is proposed - Proportional Fairness Algorithm Based on Traffic(B-PF). The algorithm is improved on the basis of the proportional fairness algorithm in the wireless communication system, taking into account the user channel condition and caching traffic information. The user outgoing traffic is considered as the adjustment factor of the scheduling priority and presents the concept of traffic satisfaction. Firstly,the algorithm calculates the priority of the user according to the scheduling algorithm and dispatches the users with the highest priority. Secondly, when a scheduled user is the business satisfied user, the system dispatches the next priority user. The simulation results show that compared with the PF algorithm, B-PF can improve the system throughput, the business satisfaction and fairness.

  4. Streaming system scheduling for Xeon Phi

    OpenAIRE

    Faltín, Tomáš

    2017-01-01

    Task scheduling in operating system area is a well-known problem on traditional system architectures (NUMA, SMP). Unfortunately, it does not perform well on emerging many-core architectures, especially on Intel Xeon Phi. We collected all publicly available information about the architecture of Xeon Phi. After that, we benchmarked the Xeon Phi in order to find the missing information about its architecture. We focused especially on the information about cores and memory controllers. These are ...

  5. Scheduling of Power Generation in Hybrid Shipboard Microgrids with Energy Storage Systems

    DEFF Research Database (Denmark)

    Othman @ Marzuki, Muzaidi Bin; Anvari-Moghaddam, Amjad; Baizura Binti Ahamad, Nor

    2018-01-01

    ship electrical network to achieve better fuel consumption with less emission. However, the low-load factor of the parallel diesel generators (DGs) in some operating conditions, can negatively affect the fuel consumption rate. As an alternative, two or more power sources such as batteries and renewable...... the operating cost of a shipboard system can be improved (based on estimation of specific fuel consumption (SFC) curve of a real system) considering the dynamic load profile with and without energy storage systems (ESSs). The case study in this paper is a ferry with a conversion from traditional diesel...

  6. Day-Ahead Scheduling of a Photovoltaic Plant by the Energy Management of a Storage System

    DEFF Research Database (Denmark)

    Marinelli, Mattia; Sossan, Fabrizio; Isleifsson, Fridrik Rafn

    2013-01-01

    The paper discusses and describes a system for energy management of a 10 kW PV plant coupled with a 15 kW - 190 kWh storage system. The overall idea is, by knowing the meteorological forecast for the next 24h, to dispatch the PV system and to be able to grant the scheduled hourly energy profile...... by a proper management of the storage. Due to forecast inaccuracies, the energy manager controls the storage in order to ensure that the plan for hourly energy production is respected, minimizing the storage itself usage. The experimental study is carried out in SYSLAB, a distributed power system test...

  7. Gradient decent based multi-objective cultural differential evolution for short-term hydrothermal optimal scheduling of economic emission with integrating wind power and photovoltaic power

    International Nuclear Information System (INIS)

    Zhang, Huifeng; Yue, Dong; Xie, Xiangpeng; Dou, Chunxia; Sun, Feng

    2017-01-01

    With the integration of wind power and photovoltaic power, optimal operation of hydrothermal power system becomes great challenge due to its non-convex, stochastic and complex-coupled constrained characteristics. This paper extends short-term hydrothermal system optimal model into short-term hydrothermal optimal scheduling of economic emission while considering integrated intermittent energy resources (SHOSEE-IIER). For properly solving SHOSEE-IIER problem, a gradient decent based multi-objective cultural differential evolution (GD-MOCDE) is proposed to improve the optimal efficiency of SHOSEE-IIER combined with three designed knowledge structures, which mainly enhances search ability of differential evolution in the shortest way. With considering those complex-coupled and stochastic constraints, a heuristic constraint-handling measurement is utilized to tackle with them both in coarse and fine tuning way, and probability constraint-handling procedures are taken to properly handle those stochastic constraints combined with their probability density functions. Ultimately, those approaches are implemented on five test systems, which testify the optimization efficiency of proposed GD-MOCDE and constraint-handling efficiency for system load balance, water balance and stochastic constraint-handling measurements, those obtained results reveal that the proposed GD-MOCDE can properly solve the SHOSEE-IIER problem combined with those constraint-handling approaches. - Highlights: • Gradient decent method is proposed to improve mutation operator. • Hydrothermal system is extended to hybrid energy system. • The uncertainty constraint is converted into deterministic constraint. • The results show the viability and efficiency of proposed algorithm.

  8. Development of full power risk monitoring system for UCN 3 and 4 nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Seung Hwan; Jang, Seung Chul; Kim, Kil Yoo; Han, Sang Hoon; Jung, Won Dae

    2002-03-01

    This report describes full power risk monitoring system (DynaRM) of NPPs which evaluates the current plant risk and monitor the risk change caused by the configuration change due to preventive maintenance or periodic maintenance activities. In order to calculate the core damage frequency, the inoperable equipment's basic event should be submitted to a quantification engine. DynaRM uses a risk monitor model converted from PSA model as the quantification engine, which can respond fast for the various equipment configuration changes. DynaRM is developed to solve these kinds of problems and difficulties. The main two key features of DynaRM are real time risk monitoring and real time maintenance plan decision supporting. With DynaRM, the plant risk can be calculated automatically only with out of service equipment information and equipment maintenance scheduling is easy by modifying the detail schedule plan. We have developed the DynaRM for the Korean standard nuclear power plant and it is currently using at Ulchin 3,4 NPP. The adaptation for the other NPPs is also easy with a little modification since DynaRM was developed by considering it to be used in the other NPPs. Moreover, we also expect DynaRM will be a good advisory tool for the plant risk monitoring and maintenance scheduling

  9. ADVANCED SCHEDULER FOR COOPERATIVE EXECUTION OF THREADS ON MULTI-CORE SYSTEM

    Directory of Open Access Journals (Sweden)

    O. N. Karasik

    2017-01-01

    Full Text Available Three architectures of the cooperative thread scheduler in a multithreaded application that is executed on a multi-core system are considered. Architecture A0 is based on the synchronization and scheduling facilities, which are provided by the operating system. Architecture A1 introduces a new synchronization primitive and a single queue of the blocked threads in the scheduler, which reduces the interaction activity between the threads and operating system, and significantly speed up the processes of blocking and unblocking the threads. Architecture A2 replaces the single queue of blocked threads with dedicated queues, one for each of the synchronizing primitives, extends the number of internal states of the primitive, reduces the inter- dependence of the scheduling threads, and further significantly speeds up the processes of blocking and unblocking the threads. All scheduler architectures are implemented on Windows operating systems and based on the User Mode Scheduling. Important experimental results are obtained for multithreaded applications that implement two blocked parallel algorithms of solving the linear algebraic equation systems by the Gaussian elimination. The algorithms differ in the way of the data distribution among threads and by the thread synchronization models. The number of threads varied from 32 to 7936. Architecture A1 shows the acceleration of up to 8.65% and the architecture A2 shows the acceleration of up to 11.98% compared to A0 architecture for the blocked parallel algorithms computing the triangular form and performing the back substitution. On the back substitution stage of the algorithms, architecture A1 gives the acceleration of up to 125%, and architecture A2 gives the acceleration of up to 413% compared to architecture A0. The experiments clearly show that the proposed architectures, A1 and A2 outperform A0 depending on the number of thread blocking and unblocking operations, which happen during the execution of

  10. An Improved Scheduling Technique for Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    clock synchronization and mode changes. We have improved the quality of the schedules by introducing a new priority function that takes into consideration the communication protocol. Communication has been optimized through packaging messages into slots with a properly selected order and lengths......In this paper we present an improved scheduling technique for the synthesis of time-triggered embedded systems. Our system model captures both the flow of data and that of control. We have considered communication of data and conditions for a time-triggered protocol implementation that supports...

  11. LPV gain-scheduled control of SCR aftertreatment systems

    Science.gov (United States)

    Meisami-Azad, Mona; Mohammadpour, Javad; Grigoriadis, Karolos M.; Harold, Michael P.; Franchek, Matthew A.

    2012-01-01

    Hydrocarbons, carbon monoxide and some of other polluting emissions produced by diesel engines are usually lower than those produced by gasoline engines. While great strides have been made in the exhaust aftertreatment of vehicular pollutants, the elimination of nitrogen oxide (NO x ) from diesel vehicles is still a challenge. The primary reason is that diesel combustion is a fuel-lean process, and hence there is significant unreacted oxygen in the exhaust. Selective catalytic reduction (SCR) is a well-developed technology for power plants and has been recently employed for reducing NO x emissions from automotive sources and in particular, heavy-duty diesel engines. In this article, we develop a linear parameter-varying (LPV) feedforward/feedback control design method for the SCR aftertreatment system to decrease NO x emissions while keeping ammonia slippage to a desired low level downstream the catalyst. The performance of the closed-loop system obtained from the interconnection of the SCR system and the output feedback LPV control strategy is then compared with other control design methods including sliding mode, and observer-based static state-feedback parameter-varying control. To reduce the computational complexity involved in the control design process, the number of LPV parameters in the developed quasi-LPV (qLPV) model is reduced by applying the principal component analysis technique. An LPV feedback/feedforward controller is then designed for the qLPV model with reduced number of scheduling parameters. The designed full-order controller is further simplified to a first-order transfer function with a parameter-varying gain and pole. Finally, simulation results using both a low-order model and a high-fidelity and high-order model of SCR reactions in GT-POWER interfaced with MATLAB/SIMULINK illustrate the high NO x conversion efficiency of the closed-loop SCR system using the proposed parameter-varying control law.

  12. Double-shell tank waste system assessment status and schedule

    International Nuclear Information System (INIS)

    Walter, E.J.

    1995-01-01

    The integrated program for completing the integrity assessments of the dangerous waste tank systems managed by the Tank Waste Remediation System (TWRS) Division of Westinghouse Hanford Company is presented in the Tank Waste Remediation System Tank System Integrity Assessments Program Plan, WHC-SD-AP017, Rev. 1. The program plan identified the assessment requirements and the general scope to which these requirements applied. Some of these assessment requirements have been met and others are either in process of completion or scheduled to be worked. To define the boundary of the double-shell tank (DST) system and the boundaries of the DST system components (or system parts) for the purpose of performing integrity assessment activities; To identify the planned activities to meet the assessment requirements for each component; Provide the status of the assessment activities; and Project a five year assessment activity schedule

  13. Manufacturing scheduling systems an integrated view on models, methods and tools

    CERN Document Server

    Framinan, Jose M; Ruiz García, Rubén

    2014-01-01

    The book is devoted to the problem of manufacturing scheduling, which is the efficient allocation of jobs (orders) over machines (resources) in a manufacturing facility. It offers a comprehensive and integrated perspective on the different aspects required to design and implement systems to efficiently and effectively support manufacturing scheduling decisions. Obtaining economic and reliable schedules constitutes the core of excellence in customer service and efficiency in manufacturing operations. Therefore, scheduling forms an area of vital importance for competition in manufacturing companies. However, only a fraction of scheduling research has been translated into practice, due to several reasons. First, the inherent complexity of scheduling has led to an excessively fragmented field in which different sub problems and issues are treated in an independent manner as goals themselves, therefore lacking a unifying view of the scheduling problem. Furthermore, mathematical brilliance and elegance has sometime...

  14. Hybrid and dependent task scheduling algorithm for on-board system software

    Institute of Scientific and Technical Information of China (English)

    魏振华; 洪炳熔; 乔永强; 蔡则苏; 彭俊杰

    2003-01-01

    In order to solve the hybrid and dependent task scheduling and critical source allocation problems, atask scheduling algorithm has been developed by first presenting the tasks, and then describing the hybrid anddependent scheduling algorithm and deriving the predictable schedulability condition. The performance of thisagorithm was evaluated through simulation, and it is concluded from the evaluation results that the hybrid taskscheduling subalgorithm based on the comparison factor can be used to solve the problem of aperiodic task beingblocked by periodic task in the traditional operating system for a very long time, which results in poor schedu-ling predictability; and the resource allocation subalgorithm based on schedulability analysis can be used tosolve the problems of critical section conflict, ceiling blocking and priority inversion; and the scheduling algo-rithm is nearest optimal when the abortable critical section is 0.6.

  15. Real-Time Forecasting of EV Charging Station Scheduling for Smart Energy Systems

    Directory of Open Access Journals (Sweden)

    Bharatiraja Chokkalingam

    2017-03-01

    Full Text Available The enormous growth in the penetration of electric vehicles (EVs, has laid the path to advancements in the charging infrastructure. Connectivity between charging stations is an essential prerequisite for future EV adoption to alleviate user’s “range anxiety”. The existing charging stations fail to adopt power provision, allocation and scheduling management. To improve the existing charging infrastructure, data based on real-time information and availability of reserves at charging stations could be uploaded to the users to help them locate the nearest charging station for an EV. This research article focuses on an a interactive user application developed through SQL and PHP platform to allocate the charging slots based on estimated battery parameters, which uses data communication with charging stations to receive the slot availability information. The proposed server-based real-time forecast charging infrastructure avoids waiting times and its scheduling management efficiently prevents the EV from halting on the road due to battery drain out. The proposed model is implemented using a low-cost microcontroller and the system etiquette tested.

  16. Uplink multi-cluster scheduling with MU-MIMO for LTE-advanced with carrier aggregation

    DEFF Research Database (Denmark)

    Wang, Hua; Nguyen, Hung Tuan; Rosa, Claudio

    2012-01-01

    -Advanced requirements and are being considered as part of LTE Release 10. In this paper, some of the physical layer enhancement techniques for LTE-Advanced have been studied including carrier aggregation (CA), uplink multi-cluster scheduling, and uplink multi-user multiple-input multiple-output (MU-MIMO) transmission....... A system-level simulation was conducted to investigate the performance gains that can be achieved in uplink CA with multi-cluster scheduling and MU-MIMO. Simulation results show that with proper separation between power-limited and non-power-limited LTE-A users, multi-cluster scheduling with CA has similar...

  17. Short-term generation scheduling model of Fujian hydro system

    Energy Technology Data Exchange (ETDEWEB)

    Wang Jinwen [School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)], E-mail: dr.jinwen.wang@gmail.com

    2009-04-15

    The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers.

  18. Short-term generation scheduling model of Fujian hydro system

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jinwen [School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-04-15

    The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers. (author)

  19. Application of genetic algorithms to the maintenance scheduling optimization in a nuclear system basing on reliability

    International Nuclear Information System (INIS)

    Lapa, Celso M. Franklin; Pereira, Claudio M.N.A.; Mol, Antonio C. de Abreu

    1999-01-01

    This paper presents a solution based on genetic algorithm and probabilistic safety analysis that can be applied in the optimization of the preventive maintenance politic of nuclear power plant safety systems. The goal of this approach is to improve the average availability of the system through the optimization of the preventive maintenance scheduling politic. The auxiliary feed water system of a two loops pressurized water reactor is used as a sample case, in order to demonstrate the effectiveness of the proposed method. The results, when compared to those obtained by some standard maintenance politics, reveal quantitative gains and operational safety levels. (author)

  20. On program restructuring, scheduling, and communication for parallel processor systems

    Energy Technology Data Exchange (ETDEWEB)

    Polychronopoulos, Constantine D. [Univ. of Illinois, Urbana, IL (United States)

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, these algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.

  1. Performance Evaluation of Bidding-Based Multi-Agent Scheduling Algorithms for Manufacturing Systems

    Directory of Open Access Journals (Sweden)

    Antonio Gordillo

    2014-10-01

    Full Text Available Artificial Intelligence techniques have being applied to many problems in manufacturing systems in recent years. In the specific field of manufacturing scheduling many studies have been published trying to cope with the complexity of the manufacturing environment. One of the most utilized approaches is (multi agent-based scheduling. Nevertheless, despite the large list of studies reported in this field, there is no resource or scientific study on the performance measure of this type of approach under very common and critical execution situations. This paper focuses on multi-agent systems (MAS based algorithms for task allocation, particularly in manufacturing applications. The goal is to provide a mechanism to measure the performance of agent-based scheduling approaches for manufacturing systems under key critical situations such as: dynamic environment, rescheduling, and priority change. With this mechanism it will be possible to simulate critical situations and to stress the system in order to measure the performance of a given agent-based scheduling method. The proposed mechanism is a pioneering approach for performance evaluation of bidding-based MAS approaches for manufacturing scheduling. The proposed method and evaluation methodology can be used to run tests in different manufacturing floors since it is independent of the workshop configuration. Moreover, the evaluation results presented in this paper show the key factors and scenarios that most affect the market-like MAS approaches for manufacturing scheduling.

  2. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  3. A Two-Level Task Scheduler on Multiple DSP System for OpenCL

    Directory of Open Access Journals (Sweden)

    Li Tian

    2014-04-01

    Full Text Available This paper addresses the problem that multiple DSP system does not support OpenCL programming. With the compiler, runtime, and the kernel scheduler proposed, an OpenCL application becomes portable not only between multiple CPU and GPU, but also between embedded multiple DSP systems. Firstly, the LLVM compiler was imported for source-to-source translation in which the translated source was supported by CCS. Secondly, two-level schedulers were proposed to support efficient OpenCL kernel execution. The DSP/BIOS is used to schedule system level tasks such as interrupts and drivers; however, the synchronization mechanism resulted in heavy overhead during task switching. So we designed an efficient second level scheduler especially for OpenCL kernel work-item scheduling. The context switch process utilizes the 8 functional units and cross path links which was superior to DSP/BIOS in the aspect of task switching. Finally, dynamic loading and software managed CACHE were redesigned for OpenCL running on multiple DSP system. We evaluated the performance using some common OpenCL kernels from NVIDIA, AMD, NAS, and Parboil benchmarks. Experimental results show that the DSP OpenCL can efficiently exploit the computing resource of multiple cores.

  4. Combined Rate and Power Allocation with Link Scheduling in Wireless Data Packet Relay Networks with Fading Channels

    OpenAIRE

    Subhrakanti Dey; Minyi Huang

    2007-01-01

    We consider a joint rate and power control problem in a wireless data traffic relay network with fading channels. The optimization problem is formulated in terms of power and rate selection, and link transmission scheduling. The objective is to seek high aggregate utility of the relay node when taking into account buffer load management and power constraints. The optimal solution for a single transmitting source is computed by a two-layer dynamic programming algorithm which leads to optimal ...

  5. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  6. Proportional fair scheduling with superposition coding in a cellular cooperative relay system

    DEFF Research Database (Denmark)

    Kaneko, Megumi; Hayashi, Kazunori; Popovski, Petar

    2013-01-01

    Many works have tackled on the problem of throughput and fairness optimization in cellular cooperative relaying systems. Considering firstly a two-user relay broadcast channel, we design a scheme based on superposition coding (SC) which maximizes the achievable sum-rate under a proportional...... fairness constraint. Unlike most relaying schemes where users are allocated orthogonally, our scheme serves the two users simultaneously on the same time-frequency resource unit by superposing their messages into three SC layers. The optimal power allocation parameters of each SC layer are derived...... by analysis. Next, we consider the general multi-user case in a cellular relay system, for which we design resource allocation algorithms based on proportional fair scheduling exploiting the proposed SC-based scheme. Numerical results show that the proposed algorithms allowing simultaneous user allocation...

  7. Multi-Temporal Decomposed Wind and Load Power Models for Electric Energy Systems

    Science.gov (United States)

    Abdel-Karim, Noha

    This thesis is motivated by the recognition that sources of uncertainties in electric power systems are multifold and may have potentially far-reaching effects. In the past, only system load forecast was considered to be the main challenge. More recently, however, the uncertain price of electricity and hard-to-predict power produced by renewable resources, such as wind and solar, are making the operating and planning environment much more challenging. The near-real-time power imbalances are compensated by means of frequency regulation and generally require fast-responding costly resources. Because of this, a more accurate forecast and look-ahead scheduling would result in a reduced need for expensive power balancing. Similarly, long-term planning and seasonal maintenance need to take into account long-term demand forecast as well as how the short-term generation scheduling is done. The better the demand forecast, the more efficient planning will be as well. Moreover, computer algorithms for scheduling and planning are essential in helping the system operators decide what to schedule and planners what to build. This is needed given the overall complexity created by different abilities to adjust the power output of generation technologies, demand uncertainties and by the network delivery constraints. Given the growing presence of major uncertainties, it is likely that the main control applications will use more probabilistic approaches. Today's predominantly deterministic methods will be replaced by methods which account for key uncertainties as decisions are made. It is well-understood that although demand and wind power cannot be predicted at very high accuracy, taking into consideration predictions and scheduling in a look-ahead way over several time horizons generally results in more efficient and reliable utilization, than when decisions are made assuming deterministic, often worst-case scenarios. This change is in approach is going to ultimately require new

  8. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  9. Online Scheduling in Distributed Message Converter Systems

    NARCIS (Netherlands)

    Risse, Thomas; Wombacher, Andreas; Surridge, Mike; Taylor, Steve; Aberer, Karl

    The optimal distribution of jobs among hosts in distributed environments is an important factor to achieve high performance. The optimal strategy depends on the application. In this paper we present a new online scheduling strategy for distributed EDI converter system. The strategy is based on the

  10. Iterative group splitting algorithm for opportunistic scheduling systems

    KAUST Repository

    Nam, Haewoon; Alouini, Mohamed-Slim

    2014-01-01

    An efficient feedback algorithm for opportunistic scheduling systems based on iterative group splitting is proposed in this paper. Similar to the opportunistic splitting algorithm, the proposed algorithm adjusts (or lowers) the feedback threshold

  11. Two-Stage Multi-Objective Collaborative Scheduling for Wind Farm and Battery Switch Station

    OpenAIRE

    Zhe Jiang; Xueshan Han; Zhimin Li; Wenbo Li; Mengxia Wang; Mingqiang Wang

    2016-01-01

    In order to deal with the uncertainties of wind power, wind farm and electric vehicle (EV) battery switch station (BSS) were proposed to work together as an integrated system. In this paper, the collaborative scheduling problems of such a system were studied. Considering the features of the integrated system, three indices, which include battery swapping demand curtailment of BSS, wind curtailment of wind farm, and generation schedule tracking of the integrated system are proposed. In additio...

  12. Demonstrating demand response from water distribution system through pump scheduling

    International Nuclear Information System (INIS)

    Menke, Ruben; Abraham, Edo; Parpas, Panos; Stoianov, Ivan

    2016-01-01

    Highlights: • Water distribution systems can profitably provide demand response energy. • STOR and FFR are financially viable under a wide range of operating conditions. • Viability depends on the pump utilisation and peak price of the electricity tariff. • Total GHG emissions caused by the provision of reserve energy are <300 gCO_2/kW h. • These are lower than those from the major reserve energy provision technologies. - Abstract: Significant changes in the power generation mix are posing new challenges for the balancing systems of the grid. Many of these challenges are in the secondary electricity grid regulation services and could be met through demand response (DR) services. We explore the opportunities for a water distribution system (WDS) to provide balancing services with demand response through pump scheduling and evaluate the associated benefits. Using a benchmark network and demand response mechanisms available in the UK, these benefits are assessed in terms of reduced green house gas (GHG) emissions from the grid due to the displacement of more polluting power sources and additional revenues for water utilities. The optimal pump scheduling problem is formulated as a mixed-integer optimisation problem and solved using a branch and bound algorithm. This new formulation finds the optimal level of power capacity to commit to the provision of demand response for a range of reserve energy provision and frequency response schemes offered in the UK. For the first time we show that DR from WDS can offer financial benefits to WDS operators while providing response energy to the grid with less greenhouse gas emissions than competing reserve energy technologies. Using a Monte Carlo simulation based on data from 2014, we demonstrate that the cost of providing the storage energy is less than the financial compensation available for the equivalent energy supply. The GHG emissions from the demand response provision from a WDS are also shown to be smaller than

  13. Low-Complexity Scheduling and Power Adaptation for Coordinated Cloud-Radio Access Networks

    KAUST Repository

    Douik, Ahmed; Dahrouj, Hayssam; Al-Naffouri, Tareq Y.; Alouini, Mohamed-Slim

    2017-01-01

    In practical wireless systems, the successful implementation of resource allocation techniques strongly depends on the algorithmic complexity. Consider a cloud-radio access network (CRAN), where the central cloud is responsible for scheduling

  14. Operation and sizing of energy storage for wind power plants in a market system

    International Nuclear Information System (INIS)

    Korpaas, M.; Holen, A.T.

    2003-01-01

    This paper presents a method for the scheduling and operation of energy storage for wind power plants in electricity markets. A dynamic programming algorithm is employed to determine the optimal energy exchange with the market for a specified scheduling period, taking into account transmission constraints. During operation, the energy storage is used to smooth variations in wind power production in order to follow the scheduling plan. The method is suitable for any type of energy storage and is also useful for other intermittent energy resources than wind. An application of the method to a case study is also presented, where the impact of energy storage sizing and wind forecasting accuracy on system operation and economics are emphasized. Simulation results show that energy storage makes it possible for owners of wind power plants to take advantage of variations in the spot price, by thus increasing the value of wind power in electricity markets. With present price estimates, energy storage devices such as reversible fuel cells are likely to be a more expensive alternative than grid expansions for the siting of wind farms in weak networks. However, for areas where grid expansions lead to unwanted interference with the local environment, energy storage should be considered as a reasonable way to increase the penetration of wind power. (author)

  15. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  16. Scheduling with Bus Access Optimization for Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Eles, Petru; Doboli, Alex; Pop, Paul

    2000-01-01

    of control. Our goal is to derive a worst case delay by which the system completes execution, such that this delay is as small as possible; to generate a logically and temporally deterministic schedule; and to optimize parameters of the communication protocol such that this delay is guaranteed. We have......In this paper, we concentrate on aspects related to the synthesis of distributed embedded systems consisting of programmable processors and application-specific hardware components. The approach is based on an abstract graph representation that captures, at process level, both dataflow and the flow......, generates an efficient bus access scheme as well as the schedule tables for activation of processes and communications....

  17. Mission needs and system commonality for space nuclear power and propulsion

    International Nuclear Information System (INIS)

    Buden, D.; Zuppero, A.; Redd, L.

    1993-01-01

    Nuclear power enables or significantly enhances a variety of space missions whether near-Earth, or for solar system exploration, lunar-Mars exploration and recovery of near-Earth resources. Performance optimizations for individual missions leads to a large number of power and propulsion systems to be developed. However, the realities of the budget and schedules indicates that the number of nuclear systems that will be developed are limited. One needs to seek the ''minimum requirements'' to do a job rather than the last ounce of performance, and areas of commonality. To develop a minimum number of systems to meet the overall DoD, NASA, and commercial needs, the broad spectrum of requirements has been examined along with cost drivers

  18. A Stochastic Operational Planning Model for Smart Power Systems

    Directory of Open Access Journals (Sweden)

    Sh. Jadid

    2014-12-01

    Full Text Available Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independent system operator should use a stochastic method to manage them. A Stochastic unit commitment is presented in this paper to schedule various power resources such as distributed generation units, conventional thermal generation units, wind and PV farms, and demand response resources. Demand response resources, interruptible loads, distributed generation units, and conventional thermal generation units are used to provide required reserve for compensating stochastic nature of various resources and loads. In the presented model, resources connected to distribution network can participate in wholesale market through aggregators. Moreover, a novel three-program model which can be used by aggregators is presented in this article. Loads and distributed generation can contract with aggregators by these programs. A three-bus test system and the IEEE RTS are used to illustrate usefulness of the presented model. The results show that ISO can manage the system effectively by using this model

  19. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  20. customer-teller scheduling system for optimizing banks service

    African Journals Online (AJOL)

    els Bank Teller scheduling system for optimizing a Banks customer service. The model takes into account real time .... tinuous observation by management personnel and thus results in .... relationships in a mathematical model. A mathematical ...

  1. Energy Storage Applications in Power Systems with Renewable Energy Generation

    Science.gov (United States)

    Ghofrani, Mahmoud

    In this dissertation, we propose new operational and planning methodologies for power systems with renewable energy sources. A probabilistic optimal power flow (POPF) is developed to model wind power variations and evaluate the power system operation with intermittent renewable energy generation. The methodology is used to calculate the operating and ramping reserves that are required to compensate for power system uncertainties. Distributed wind generation is introduced as an operational scheme to take advantage of the spatial diversity of renewable energy resources and reduce wind power fluctuations using low or uncorrelated wind farms. The POPF is demonstrated using the IEEE 24-bus system where the proposed operational scheme reduces the operating and ramping reserve requirements and operation and congestion cost of the system as compared to operational practices available in the literature. A stochastic operational-planning framework is also proposed to adequately size, optimally place and schedule storage units within power systems with high wind penetrations. The method is used for different applications of energy storage systems for renewable energy integration. These applications include market-based opportunities such as renewable energy time-shift, renewable capacity firming, and transmission and distribution upgrade deferral in the form of revenue or reduced cost and storage-related societal benefits such as integration of more renewables, reduced emissions and improved utilization of grid assets. A power-pool model which incorporates the one-sided auction market into POPF is developed. The model considers storage units as market participants submitting hourly price bids in the form of marginal costs. This provides an accurate market-clearing process as compared to the 'price-taker' analysis available in the literature where the effects of large-scale storage units on the market-clearing prices are neglected. Different case studies are provided to

  2. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, P.M.

    1985-07-01

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs.

  3. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1985-07-01

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs

  4. The power of reordering for online minimum makespan scheduling

    OpenAIRE

    Englert, Matthias; Özmen, Deniz; Westermann, Matthias

    2014-01-01

    In the classic minimum makespan scheduling problem, we are given an input sequence of jobs with processing times. A scheduling algorithm has to assign the jobs to m parallel machines. The objective is to minimize the makespan, which is the time it takes until all jobs are processed. In this paper, we consider online scheduling algorithms without preemption. However, we do not require that each arriving job has to be assigned immediately to one of the machines. A reordering buffer with limited...

  5. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  6. Real-time Energy Resource Scheduling considering a Real Portuguese Scenario

    DEFF Research Database (Denmark)

    Silva, Marco; Sousa, Tiago; Morais, Hugo

    2014-01-01

    The development in power systems and the introduction of decentralized gen eration and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which...... scheduling in smart grids, considering day - ahead, hour - ahead and real - time scheduling. The case study considers a 33 - bus distribution network with high penetration of distributed energy resources . The wind generation profile is base d o n a rea l Portuguese wind farm . Four scenarios are presented...... taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour - ahead and real - time scheduling...

  7. Design and implementation of real-time diagnostic expert system in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Yan; Zhou Zhiwei; Dong Xiuchen

    2006-01-01

    In order to decrease the probability of malfunctions in nuclear power plant, a real-time expert system to be applied to malfunction diagnosis was designed. Based on the expert system theory the system converts the expert knowledge for diagnosing failures into the rules stored in database, and it can display real-time information of the abnormal symptoms, perform real-time diagnosis of malfunctions and suggest the operation actions related to malfunctions, etc. The results indicate that several typical malfunctions in nuclear power plant are diagnosed automatically and the corresponding operation schedules are given out by present expert system. (authors)

  8. The applicability of knowledge-based scheduling to the utilities industry

    International Nuclear Information System (INIS)

    Yoshimoto, G.; Gargan, R. Jr.; Duggan, P.

    1992-01-01

    The Electric Power Research Institute (EPRI), Nuclear Power Division, has identified the three major goals of high technology applications for nuclear power plants. These goals are to enhance power production through increasing power generation efficiency, to increase productivity of the operations, and to reduce the threats to the safety of the plant. Our project responds to the second goal by demonstrating that significant productivity increases can be achieved for outage maintenance operations based on existing knowledge-based scheduling technology. Its use can also mitigate threats to potential safety problems by means of the integration of risk assessment features into the scheduler. The scheduling approach uses advanced techniques enabling the automation of the routine scheduling decision process that previously was handled by people. The process of removing conflicts in scheduling is automated. This is achieved by providing activity representations that allow schedulers to express a variety of different scheduling constraints and by implementing scheduling mechanisms that simulate kinds of processes that humans use to find better solutions from a large number of possible solutions. This approach allows schedulers to express detailed constraints between activities and other activities, resources (material and personnel), and requirements that certain states exist for their execution. Our scheduler has already demonstrated its benefit to improving the shuttle processing flow management at Kennedy Space Center. Knowledge-based scheduling techniques should be examined by utilities industry researchers, developers, operators and management for application to utilities planning problems because of its great cost benefit potential. 4 refs., 4 figs

  9. Optimal Scheduling of a Battery Energy Storage System with Electric Vehicles’ Auxiliary for a Distribution Network with Renewable Energy Integration

    Directory of Open Access Journals (Sweden)

    Yuqing Yang

    2015-09-01

    Full Text Available With global conventional energy depletion, as well as environmental pollution, utilizing renewable energy for power supply is the only way for human beings to survive. Currently, distributed generation incorporated into a distribution network has become the new trend, with the advantages of controllability, flexibility and tremendous potential. However, the fluctuation of distributed energy resources (DERs is still the main concern for accurate deployment. Thus, a battery energy storage system (BESS has to be involved to mitigate the bad effects of DERs’ integration. In this paper, optimal scheduling strategies for BESS operation have been proposed, to assist with consuming the renewable energy, reduce the active power loss, alleviate the voltage fluctuation and minimize the electricity cost. Besides, the electric vehicles (EVs considered as the auxiliary technique are also introduced to attenuate the DERs’ influence. Moreover, both day-ahead and real-time operation scheduling strategies were presented under the consideration with the constraints of BESS and the EVs’ operation, and the optimization was tackled by a fuzzy mathematical method and an improved particle swarm optimization (IPSO algorithm. Furthermore, the test system for the proposed strategies is a real distribution network with renewable energy integration. After simulation, the proposed scheduling strategies have been verified to be extremely effective for the enhancement of the distribution network characteristics.

  10. Wind Power Forecasting Error Frequency Analyses for Operational Power System Studies: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Florita, A.; Hodge, B. M.; Milligan, M.

    2012-08-01

    The examination of wind power forecasting errors is crucial for optimal unit commitment and economic dispatch of power systems with significant wind power penetrations. This scheduling process includes both renewable and nonrenewable generators, and the incorporation of wind power forecasts will become increasingly important as wind fleets constitute a larger portion of generation portfolios. This research considers the Western Wind and Solar Integration Study database of wind power forecasts and numerical actualizations. This database comprises more than 30,000 locations spread over the western United States, with a total wind power capacity of 960 GW. Error analyses for individual sites and for specific balancing areas are performed using the database, quantifying the fit to theoretical distributions through goodness-of-fit metrics. Insights into wind-power forecasting error distributions are established for various levels of temporal and spatial resolution, contrasts made among the frequency distribution alternatives, and recommendations put forth for harnessing the results. Empirical data are used to produce more realistic site-level forecasts than previously employed, such that higher resolution operational studies are possible. This research feeds into a larger work of renewable integration through the links wind power forecasting has with various operational issues, such as stochastic unit commitment and flexible reserve level determination.

  11. Multi-objective scheduling of electric vehicles in smart distribution system

    International Nuclear Information System (INIS)

    Zakariazadeh, Alireza; Jadid, Shahram; Siano, Pierluigi

    2014-01-01

    Highlights: • Environmental/economic operational scheduling of electric vehicles. • The Vehicle to Grid capability and the actual patterns of drivers are considered. • A novel conceptual model for an electric vehicle management system is proposed. - Abstract: When preparing for the widespread adoption of Electric Vehicles (EVs), an important issue is to use a proper EVs’ charging/discharging scheduling model that is able to simultaneously consider economic and environmental goals as well as technical constraints of distribution networks. This paper proposes a multi-objective operational scheduling method for charging/discharging of EVs in a smart distribution system. The proposed multi-objective framework, based on augmented ε-constraint method, aims at minimizing the total operational costs and emissions. The Vehicle to Grid (V2G) capability as well as the actual patterns of drivers are considered in order to generate the Pareto-optimal solutions. The Benders decomposition technique is used in order to solve the proposed optimization model and to convert the large scale mixed integer nonlinear problem into mixed-integer linear programming and nonlinear programming problems. The effectiveness of the proposed resources scheduling approach is tested on a 33-bus distribution test system over a 24-h period. The results show that the proposed EVs’ charging/discharging method can reduce both of operation cost and air pollutant emissions

  12. Scheduling algorithms for automatic control systems for technological processes

    Science.gov (United States)

    Chernigovskiy, A. S.; Tsarev, R. Yu; Kapulin, D. V.

    2017-01-01

    Wide use of automatic process control systems and the usage of high-performance systems containing a number of computers (processors) give opportunities for creation of high-quality and fast production that increases competitiveness of an enterprise. Exact and fast calculations, control computation, and processing of the big data arrays - all of this requires the high level of productivity and, at the same time, minimum time of data handling and result receiving. In order to reach the best time, it is necessary not only to use computing resources optimally, but also to design and develop the software so that time gain will be maximal. For this purpose task (jobs or operations), scheduling techniques for the multi-machine/multiprocessor systems are applied. Some of basic task scheduling methods for the multi-machine process control systems are considered in this paper, their advantages and disadvantages come to light, and also some usage considerations, in case of the software for automatic process control systems developing, are made.

  13. Reducing Downlink Signaling Traffic in Wireless Systems Using Mobile-Assisted Scheduling

    OpenAIRE

    Moosavi, Reza; Larsson, Erik G.

    2010-01-01

    We present an idea to reduce the part of the downlink signaling traffic in wireless multiple access systems that contains scheduling information. The theoretical basis of the scheme is that the scheduling decisions made by the base station are correlated with the CSI reports from the mobiles. This correlation can be exploited by the source coding scheme that is used to compress the scheduling maps before they are sent to the mobiles. In the proposed scheme, this idea is implemented by letting...

  14. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  15. A Conceptual Level Design for a Static Scheduler for Hard Real-Time Systems

    Science.gov (United States)

    1988-03-01

    The design of hard real - time systems is gaining a great deal of attention in the software engineering field as more and more real-world processes are...for these hard real - time systems . PSDL, as an executable design language, is supported by an execution support system consisting of a static scheduler, dynamic scheduler, and translator.

  16. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  17. Hidden power system inflexibilities imposed by traditional unit commitment formulations

    International Nuclear Information System (INIS)

    Morales-España, Germán; Ramírez-Elizondo, Laura; Hobbs, Benjamin F.

    2017-01-01

    Highlights: • Quality and accuracy of traditional-energy- and power-based UCs are evaluated. • Real-time performance evaluation simulating “perfect” stochastic UCs. • Ideal energy-based stochastic UC formulations impose hidden system inflexibilities. • A deterministic power-based UC may outperform an ideal energy-based stochastic UC. • Power-based UC overcomes flaws of energy-based UC: lower cost and wind curtailment. - Abstract: Approximations made in traditional day-ahead unit commitment model formulations can result in suboptimal or even infeasible schedules for slow-start units and inaccurate predictions of actual costs and wind curtailment. With increasing wind penetration, these errors will become economically more significant. Here, we consider inaccuracies from three approximations: the use of hourly intervals in which energy production from each generator is modeled as being constant; the disregarding of startup and shutdown energy trajectories; and optimization based on expected wind profiles. The results of unit commitment formulations with those assumptions are compared to models that: (1) use a piecewise-linear power profiles of generation, load and wind, instead of the traditional stepwise energy profiles; (2) consider startup/shutdown trajectories; and (3) include many possible wind trajectories in a stochastic framework. The day-ahead hourly schedules of slow-start generators are then evaluated against actual wind and load profiles using a model real-time dispatch and quick-start unit commitment with a 5 min time step. We find that each simplification usually causes expected generation costs to increase by several percentage points, and results in significant understatement of expected wind curtailment and, in some cases, load interruptions. The inclusion of startup and shutdown trajectories often yielded the largest improvements in schedule performance.

  18. SPORT: An Algorithm for Divisible Load Scheduling with Result Collection on Heterogeneous Systems

    Science.gov (United States)

    Ghatpande, Abhay; Nakazato, Hidenori; Beaumont, Olivier; Watanabe, Hiroshi

    Divisible Load Theory (DLT) is an established mathematical framework to study Divisible Load Scheduling (DLS). However, traditional DLT does not address the scheduling of results back to source (i. e., result collection), nor does it comprehensively deal with system heterogeneity. In this paper, the DLSRCHETS (DLS with Result Collection on HET-erogeneous Systems) problem is addressed. The few papers to date that have dealt with DLSRCHETS, proposed simplistic LIFO (Last In, First Out) and FIFO (First In, First Out) type of schedules as solutions to DLSRCHETS. In this paper, a new polynomial time heuristic algorithm, SPORT (System Parameters based Optimized Result Transfer), is proposed as a solution to the DLSRCHETS problem. With the help of simulations, it is proved that the performance of SPORT is significantly better than existing algorithms. The other major contributions of this paper include, for the first time ever, (a) the derivation of the condition to identify the presence of idle time in a FIFO schedule for two processors, (b) the identification of the limiting condition for the optimality of FIFO and LIFO schedules for two processors, and (c) the introduction of the concept of equivalent processor in DLS for heterogeneous systems with result collection.

  19. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  20. Ensuring the Reliable Operation of the Power Grid: State-Based and Distributed Approaches to Scheduling Energy and Contingency Reserves

    Science.gov (United States)

    Prada, Jose Fernando

    Keeping a contingency reserve in power systems is necessary to preserve the security of real-time operations. This work studies two different approaches to the optimal allocation of energy and reserves in the day-ahead generation scheduling process. Part I presents a stochastic security-constrained unit commitment model to co-optimize energy and the locational reserves required to respond to a set of uncertain generation contingencies, using a novel state-based formulation. The model is applied in an offer-based electricity market to allocate contingency reserves throughout the power grid, in order to comply with the N-1 security criterion under transmission congestion. The objective is to minimize expected dispatch and reserve costs, together with post contingency corrective redispatch costs, modeling the probability of generation failure and associated post contingency states. The characteristics of the scheduling problem are exploited to formulate a computationally efficient method, consistent with established operational practices. We simulated the distribution of locational contingency reserves on the IEEE RTS96 system and compared the results with the conventional deterministic method. We found that assigning locational spinning reserves can guarantee an N-1 secure dispatch accounting for transmission congestion at a reasonable extra cost. The simulations also showed little value of allocating downward reserves but sizable operating savings from co-optimizing locational nonspinning reserves. Overall, the results indicate the computational tractability of the proposed method. Part II presents a distributed generation scheduling model to optimally allocate energy and spinning reserves among competing generators in a day-ahead market. The model is based on the coordination between individual generators and a market entity. The proposed method uses forecasting, augmented pricing and locational signals to induce efficient commitment of generators based on firm

  1. Multiuser switched diversity scheduling systems with per-user threshold

    KAUST Repository

    Nam, Haewoon

    2010-05-01

    A multiuser switched diversity scheduling scheme with per-user feedback threshold is proposed and analyzed in this paper. The conventional multiuser switched diversity scheduling scheme uses a single feedback threshold for every user, where the threshold is a function of the average signal-to-noise ratios (SNRs) of the users as well as the number of users involved in the scheduling process. The proposed scheme, however, constructs a sequence of feedback thresholds instead of a single feedback threshold such that each user compares its channel quality with the corresponding feedback threshold in the sequence. Numerical and simulation results show that thanks to the flexibility of threshold selection, where a potentially different threshold can be used for each user, the proposed scheme provides a higher system capacity than that for the conventional scheme. © 2006 IEEE.

  2. Gain scheduling controller for pitch control of a TRMS system

    Science.gov (United States)

    Bhagyalakshmi, R.; Rashmi, GP; Jaganatha Pandian, B.

    2017-11-01

    Gain scheduling is a control technique which is applied for the control of non-linear systems by using a family of linear controllers at different operating points so as to increase the range of operation of the process. The dynamics of any nonlinear system changes with respect to operating points. These operating points are characterized by one or more variables known as scheduling variables. In such cases, we linearize the system at different equilibrium points. Due to the high amount of non-linearities and complexity in the aerodynamic design, modelling of other unmanned aerial vehicles have been replaced here with twin rotor system. The linearized system is then controlled by using PID controllers which are designed with respect to the obtained operating points. Linearizing of the non-linear system, designing and tuning of PID are being implemented using different MATLAB functions.

  3. Energy management strategy based on short-term generation scheduling for a renewable microgrid using a hydrogen storage system

    International Nuclear Information System (INIS)

    Cau, Giorgio; Cocco, Daniele; Petrollese, Mario; Knudsen Kær, Søren; Milan, Christian

    2014-01-01

    Highlights: • Energy management strategy for hybrid stand-alone power plant with hydrogen storage. • Optimal scheduling of storage devices to minimize the utilization costs. • A scenario tree method is used to manage uncertainties of weather and load forecasts. • A reduction of operational costs and energy losses is achieved. - Abstract: This paper presents a novel energy management strategy (EMS) to control an isolated microgrid powered by a photovoltaic array and a wind turbine and equipped with two different energy storage systems: electric batteries and a hydrogen production and storage system. In particular, an optimal scheduling of storage devices is carried out to maximize the benefits of available renewable resources by operating the photovoltaic systems and the wind turbine at their maximum power points and by minimizing the overall utilization costs. Unlike conventional EMS based on the state-of-charge (SOC) of batteries, the proposed EMS takes into account the uncertainty due to the intermittent nature of renewable resources and electricity demand. In particular, the uncertainties are evaluated with a stochastic approach through the construction of different scenarios with corresponding probabilities. The EMS is defined by minimizing the utilization costs of the energy storage equipment. The weather conditions recorded in four different weeks between April and December are used as case studies to test the proposed EMS and the results obtained are compared with a conventional EMS based on the state-of-charge of batteries. The results show a reduction of utilization costs of about 15% in comparison to conventional SOC-based EMS and an increase of the average energy storage efficiency

  4. Optimal trajectory planning and train scheduling for urban rail transit systems

    CERN Document Server

    Wang, Yihui; van den Boom, Ton; De Schutter, Bart

    2016-01-01

    This book contributes to making urban rail transport fast, punctual and energy-efficient –significant factors in the importance of public transportation systems to economic, environmental and social requirements at both municipal and national levels. It proposes new methods for shortening passenger travel times and for reducing energy consumption, addressing two major topics: (1) train trajectory planning: the authors derive a nonlinear model for the operation of trains and present several approaches for calculating optimal and energy-efficient trajectories within a given schedule; and (2) train scheduling: the authors develop a train scheduling model for urban rail systems and optimization approaches with which to balance total passenger travel time with energy efficiency and other costs to the operator. Mixed-integer linear programming and pseudospectral methods are among the new methods proposed for single- and multi-train systems for the solution of the nonlinear trajectory planning problem which involv...

  5. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    resources and to reduce the costs of communication. Planning and scheduling is generally a heavy consumer of time, memory and energy resources. This means careful thought must be given to how much planning and scheduling should be done on the sensors themselves, and how much to do elsewhere. The difficulty of planning and scheduling is exacerbated when reasoning about uncertainty. More time, memory and energy is needed to solve such problems, leading either to more expensive sensors, or suboptimal plans. For example, scientifically interesting events may happen at random times, making it difficult to ensure that sufficient resources are availanble. Since uncertainty is usually lowest in proximity to the sensors themselves, this argues for planning and scheduling onboard the sensors. However, cost minimization dictates sensors be kept as simple as possible, reducing the amount of planning and scheduling they can do themselves. Furthermore, coordinating each sensor's independent plans can be difficult. In the full presentation, we will critically review the planning and scheduling systems used by previously fielded sensor networks. We do so primarily from the perspective of the computational sciences, with a focus on taming computational complexity when operating sensor networks. The case studies are derived from sensor networks based on UAVs, satellites, and planetary rovers. Planning and scheduling considerations include multi-sensor coordination, optimizing science value, onboard power management, onboard memory, planning movement actions to acquire data, and managing communications.These case studies offer lessons for future designs of environmental sensor networks.

  6. Optimization of workflow scheduling in Utility Management System with hierarchical neural network

    Directory of Open Access Journals (Sweden)

    Srdjan Vukmirovic

    2011-08-01

    Full Text Available Grid computing could be the future computing paradigm for enterprise applications, one of its benefits being that it can be used for executing large scale applications. Utility Management Systems execute very large numbers of workflows with very high resource requirements. This paper proposes architecture for a new scheduling mechanism that dynamically executes a scheduling algorithm using feedback about the current status Grid nodes. Two Artificial Neural Networks were created in order to solve the scheduling problem. A case study is created for the Meter Data Management system with measurements from the Smart Metering system for the city of Novi Sad, Serbia. Performance tests show that significant improvement of overall execution time can be achieved by Hierarchical Artificial Neural Networks.

  7. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  8. BINARY PARTICLE SWARM OPTIMIZATION APPROACH FOR RANDOM GENERATION OUTAGE MAINTENANCE SCHEDULING

    Directory of Open Access Journals (Sweden)

    K. Suresh

    2013-01-01

    Full Text Available This paper presents a methodology for maintenance scheduling (MS of generators using binary particle swarm optimization (BPSO based probabilistic approach. The objective of this paper is to reduce the loss of load probability (LOLP for a power system. The capacity outage probability table (COPT is the initial step in creating maintenance schedule using the probabilistic levelized risk method. This paper proposes BPSO method which is used to construct the COPT. In order to mitigate the effects of probabilistic levelized risk method, BPSO based probabilistic levelized risk method is embarked on a MS problem. In order to validate the effectiveness of the proposed algorithm, case study results for simple five unit system can accomplish a significant levelization in the reliability indices that make possible to evaluate system generation system adequacy in the MS horizon of the power system. The proposed method shows better performance compared with other optimization methods and conventional method with improved search performance.

  9. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  10. Preventive maintenance optimization for a multi-component system under changing job shop schedule

    International Nuclear Information System (INIS)

    Zhou Xiaojun; Lu Zhiqiang; Xi Lifeng

    2012-01-01

    Variability and small lot size is a common feature for many discrete manufacturing processes designed to meet a wide array of customer needs. Because of this, job shop schedule often has to be continuously updated in reaction to changes in production plan. Generally, the aim of preventive maintenance is to ensure production effectiveness and therefore the preventive maintenance models must have the ability to be adaptive to changes in job shop schedule. In this paper, a dynamic opportunistic preventive maintenance model is developed for a multi-component system with considering changes in job shop schedule. Whenever a job is completed, preventive maintenance opportunities arise for all the components in the system. An optimal maintenance practice is dynamically determined by maximizing the short-term cumulative opportunistic maintenance cost savings for the system. The numerical example shows that the scheme obtained by the proposed model can effectively address the preventive maintenance scheduling problem caused by the changes in job shop schedule and is more efficient than the ones based on two other commonly used preventive maintenance models.

  11. Integration of scheduling and discrete event simulation systems to improve production flow planning

    Science.gov (United States)

    Krenczyk, D.; Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.

    2016-08-01

    The increased availability of data and computer-aided technologies such as MRPI/II, ERP and MES system, allowing producers to be more adaptive to market dynamics and to improve production scheduling. Integration of production scheduling and computer modelling, simulation and visualization systems can be useful in the analysis of production system constraints related to the efficiency of manufacturing systems. A integration methodology based on semi-automatic model generation method for eliminating problems associated with complexity of the model and labour-intensive and time-consuming process of simulation model creation is proposed. Data mapping and data transformation techniques for the proposed method have been applied. This approach has been illustrated through examples of practical implementation of the proposed method using KbRS scheduling system and Enterprise Dynamics simulation system.

  12. Scheduling with Optimized Communication for Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    We present an approach to process scheduling for synthesis of safety-critical distributed embedded systems.Our system model captures both the flow of data and that of control. The communication model is based on a time-triggered protocol. We take into consideration overheads due to communication...

  13. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    Science.gov (United States)

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  14. Plant process computer replacements - techniques to limit installation schedules and costs

    International Nuclear Information System (INIS)

    Baker, M.D.; Olson, J.L.

    1992-01-01

    Plant process computer systems, a standard fixture in all nuclear power plants, are used to monitor and display important plant process parameters. Scanning thousands of field sensors and alarming out-of-limit values, these computer systems are heavily relied on by control room operators. The original nuclear steam supply system (NSSS) vendor for the power plant often supplied the plant process computer. Designed using sixties and seventies technology, a plant's original process computer has been obsolete for some time. Driven by increased maintenance costs and new US Nuclear Regulatory Commission regulations such as NUREG-0737, Suppl. 1, many utilities have replaced their process computers with more modern computer systems. Given that computer systems are by their nature prone to rapid obsolescence, this replacement cycle will likely repeat. A process computer replacement project can be a significant capital expenditure and must be performed during a scheduled refueling outage. The object of the installation process is to install a working system on schedule. Experience gained by supervising several computer replacement installations has taught lessons that, if applied, will shorten the schedule and limit the risk of costly delays. Examples illustrating this technique are given. This paper and these examples deal only with the installation process and assume that the replacement computer system has been adequately designed, and development and factory tested

  15. Physician satisfaction with a multi-platform digital scheduling system.

    Directory of Open Access Journals (Sweden)

    Rodrigo Octávio Deliberato

    Full Text Available Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation.Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after.51 (77% of the physicians answered the baseline survey. Of those, 32 (63% were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70% of the responders were using more than one method to carry out shift exchanges and only 20 (40% were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73% physicians. Forty-eight (98% of them found the mobile application easy or very easy to install and 47 (96% did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001. The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001.Our web and mobile phone-based scheduling system resulted in better physician satisfaction.

  16. Using Optimization Models for Scheduling in Enterprise Resource Planning Systems

    Directory of Open Access Journals (Sweden)

    Frank Herrmann

    2016-03-01

    Full Text Available Companies often use specially-designed production systems and change them from time to time. They produce small batches in order to satisfy specific demands with the least tardiness. This imposes high demands on high-performance scheduling algorithms which can be rapidly adapted to changes in the production system. As a solution, this paper proposes a generic approach: solutions were obtained using a widely-used commercially-available tool for solving linear optimization models, which is available in an Enterprise Resource Planning System (in the SAP system for example or can be connected to it. In a real-world application of a flow shop with special restrictions this approach is successfully used on a standard personal computer. Thus, the main implication is that optimal scheduling with a commercially-available tool, incorporated in an Enterprise Resource Planning System, may be the best approach.

  17. An Efficient Live TV Scheduling System for 4G LTE Broadcast

    KAUST Repository

    Lau, Chun Pong

    2016-01-01

    Traditional live television (TV) broadcasting systems are proven to be spectrum inefficient. Therefore, researchers propose to provide TV services on fourth-generation (4G) long-term evolution (LTE) networks. However, static broadcast, a typical broadcasting method over cellular network, is inefficient in terms of radio resource usage. To solve this problem, the audience-driven live TV scheduling (ADTVS) framework is proposed, to maximize radio resource usage when providing TV broadcasting services over LTE networks. ADTVS, a system-level scheduling framework, considers both available radio resources and audience preferences, in order to dynamically schedule TV channels for broadcasting at various time and locations. By conducting a simulation using real-life data and scenarios, it is shown that ADTVS significantly outperforms the static broadcast method. Numerical results indicate that, on average, ADTVS enables substantial improvement to broadcast efficiency and conserves considerable amount of radio resources, while forgoing less than 5% of user services compared to the benchmark system.

  18. The potential application of military fleet scheduling tools to the Federal Waste Management System Transportation System

    International Nuclear Information System (INIS)

    Harrison, I.G.; Pope, R.B.; Kraemer, R.D.; Hilliard, M.R.

    1991-01-01

    This paper discusses the feasibility of adapting concepts and tools that were developed for the US military's transportation management systems to the management of the Federal Waste Management System's (FWMS) Transportation System. Many of the lessons in the development of the planning and scheduling software for the US military are applicable to the development of similar software for the FWMS Transportation System. The resulting system would be invaluable to the US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM), both initially, for long-range planning, and later, in day-to-day scheduling and management activities

  19. Scheduling and control of programs in the CICADA computer system for TFTR

    International Nuclear Information System (INIS)

    Christianson, G.B.; Sherrick, M.; Stark, W.

    1983-01-01

    The CICADA computer system is a network of super minicomputers for data acquisition, reduction, display and device control on the TFTR experiment. Human interaction with the CICADA system is accomplished by consoles offering color displays with a high degree of operator interaction with the computer system, and by interactive terminals offering a limited degree of operator interaction. The authors describe the software packages and data bases used to control the consoles and provide communication to an application program attached to a console. The console control program in its turn schedules the execution of control programs that furnish operating system interfaces to applications programs executing at a console or terminal (in response to human activation), or upon activation by scheduling tasks. The control programs handle functions such as applications task activation. They discuss the implementation of the control programs in the multi-computer CICADA environment, and describe the control program data bases. In a TFTR shot cycle, applications programs must be scheduled for activation at operator-defined stages, in order to accomplish the arming of hardware devices, acquisition of summary waveform data, and the acquisition and archiving of raw data. The authors describe the software tasks and data bases of the CICADA event system, which accomplishes this scheduling of applications task activation in conjunction with the control programs. Future enhancements planned for the console control, program control, and event systems are outlined

  20. Identification of the recommended waste management systems and system development schedules: Regional Management Plan

    International Nuclear Information System (INIS)

    1986-01-01

    This report describes the evaluations of alternatives for low-level waste treatment and disposal leading to the selection of four disposal methods and two treatment alternatives (including the alternative of only continuing current methods of waste treatment used by the waste generators) that were used to form candidate waste management systems. The subsequent evaluation of waste management systems and schedules for the development of the regional waste management system under four different scenarios are also included. The report also describes the consequences to the member states and their waste generators of the four scenarios and presents insights into preferred courses of action that arise from the scheduling exercise. 13 refs., 14 figs., 2 tabs

  1. A new intuitionistic fuzzy rule-based decision-making system for an operating system process scheduler.

    Science.gov (United States)

    Butt, Muhammad Arif; Akram, Muhammad

    2016-01-01

    We present a new intuitionistic fuzzy rule-based decision-making system based on intuitionistic fuzzy sets for a process scheduler of a batch operating system. Our proposed intuitionistic fuzzy scheduling algorithm, inputs the nice value and burst time of all available processes in the ready queue, intuitionistically fuzzify the input values, triggers appropriate rules of our intuitionistic fuzzy inference engine and finally calculates the dynamic priority (dp) of all the processes in the ready queue. Once the dp of every process is calculated the ready queue is sorted in decreasing order of dp of every process. The process with maximum dp value is sent to the central processing unit for execution. Finally, we show complete working of our algorithm on two different data sets and give comparisons with some standard non-preemptive process schedulers.

  2. Timing analysis for embedded systems using non-preemptive EDF scheduling under bounded error arrivals

    Directory of Open Access Journals (Sweden)

    Michael Short

    2017-07-01

    Full Text Available Embedded systems consist of one or more processing units which are completely encapsulated by the devices under their control, and they often have stringent timing constraints associated with their functional specification. Previous research has considered the performance of different types of task scheduling algorithm and developed associated timing analysis techniques for such systems. Although preemptive scheduling techniques have traditionally been favored, rapid increases in processor speeds combined with improved insights into the behavior of non-preemptive scheduling techniques have seen an increased interest in their use for real-time applications such as multimedia, automation and control. However when non-preemptive scheduling techniques are employed there is a potential lack of error confinement should any timing errors occur in individual software tasks. In this paper, the focus is upon adding fault tolerance in systems using non-preemptive deadline-driven scheduling. Schedulability conditions are derived for fault-tolerant periodic and sporadic task sets experiencing bounded error arrivals under non-preemptive deadline scheduling. A timing analysis algorithm is presented based upon these conditions and its run-time properties are studied. Computational experiments show it to be highly efficient in terms of run-time complexity and competitive ratio when compared to previous approaches.

  3. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  4. 18 CFR 420.41 - Schedule of water charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Schedule of water charges. 420.41 Section 420.41 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Charges; Exemptions § 420.41 Schedule of water...

  5. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  6. Iterative group splitting algorithm for opportunistic scheduling systems

    KAUST Repository

    Nam, Haewoon

    2014-05-01

    An efficient feedback algorithm for opportunistic scheduling systems based on iterative group splitting is proposed in this paper. Similar to the opportunistic splitting algorithm, the proposed algorithm adjusts (or lowers) the feedback threshold during a guard period if no user sends a feedback. However, when a feedback collision occurs at any point of time, the proposed algorithm no longer updates the threshold but narrows down the user search space by dividing the users into multiple groups iteratively, whereas the opportunistic splitting algorithm keeps adjusting the threshold until a single user is found. Since the threshold is only updated when no user sends a feedback, it is shown that the proposed algorithm significantly alleviates the signaling overhead for the threshold distribution to the users by the scheduler. More importantly, the proposed algorithm requires a less number of mini-slots than the opportunistic splitting algorithm to make a user selection with a given level of scheduling outage probability or provides a higher ergodic capacity given a certain number of mini-slots. © 2013 IEEE.

  7. Coordination and decision making of regulation, operation, and market activities in power systems

    Science.gov (United States)

    Nakashima, Tomoaki

    Electric power has been traditionally supplied to customers at regulated rates by vertically integrated utilities (VIUs), which own generation, transmission, and distribution systems. However, the regulatory authorities of VIUs are promoting competition in their businesses to lower the price of electric energy. Consequently, in new deregulated circumstances, many suppliers and marketers compete in the generation market, and conflict of interest may often occur over transmission. Therefore, a neutral entity, called an independent system operator (ISO), which operates the power system independently, has been established to give market participants nondiscriminatory access to transmission sectors with a natural monopoly, and to facilitate competition in generation sectors. Several types of ISOs are established at present, with their respective regions and authorities. The ISO receives many requests from market participants to transfer power, and must evaluate the feasibility of their requests under the system's condition. In the near future, regulatory authorities may impose various objectives on the ISOs. Then, based on the regulators' policies, the ISO must determine the optimal schedules from feasible solutions, or change the market participants' requests. In a newly developed power market, market participants will conduct their transactions in order to maximize their profit. The most crucial information in conducting power transactions is price and demand. A direct transaction between suppliers and consumers may become attractive because of its stability of price, while in a power exchange market, gaming and speculation of participants may push up electricity prices considerably. To assist the consumers in making effective decisions, suitable methods for forecasting volatile market price are necessary. This research has been approached from three viewpoints: Firstly, from the system operator's point of view, desirable system operation and power market structure

  8. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  9. Employee Responses to Flexible Work Schedules: An Inter-Organization, Inter-System Comparison.

    Science.gov (United States)

    Pierce, Jon L.; Newstrom, John W.

    1982-01-01

    Compared employee affective and behavioral responses to four work schedules--a fixed-hour schedule and three variations of flexible working hours. Hypothesized systematic differences in employee responses reflecting increased flexibility were not supported. Employees generally responded more favorably to flexible hour systems as contrasted with…

  10. A new approach for global synchronization in hierarchical scheduled real-time systems

    NARCIS (Netherlands)

    Behnam, M.; Nolte, T.; Bril, R.J.

    2009-01-01

    We present our ongoing work to improve an existing synchronization protocol SIRAP for hierarchically scheduled real-time systems. A less pessimistic schedulability analysis is presented which can make the SIRAP protocol more efficient in terms of calculated CPU resource needs. In addition and for

  11. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  12. Delay consequencies in the construction time-schedule of nuclear power plants in relation to its safety and quality

    International Nuclear Information System (INIS)

    Recalde, J.A.

    1991-01-01

    An important delay in the construction time-schedule of a Nuclear Power Plant affects its safety and quality. This mainly occurs as a consequence of four reasons: discontinuity of the personnel working for the project; discontinuities of project suppliers; new safety and quality concepts; long-term storage. This work analyses each of the above reasons so as to foresee countermeasures to garantee the non deterioration of a Nuclear Power Plant. (author)

  13. A SCHEDULING SCHEME WITH DYNAMIC FREQUENCY CLOCKING AND MULTIPLE VOLTAGES FOR LOW POWER DESIGNS

    Institute of Scientific and Technical Information of China (English)

    Wen Dongxin; Wang Ling; Yang Xiaozong

    2007-01-01

    In this letter, a scheduling scheme based on Dynamic Frequency Clocking (DFC) and multiple voltages is proposed for low power designs under the timing and the resource constraints.Unlike the conventional methods at high level synthesis where only voltages of nodes were considered,the scheme based on a gain function considers both voltage and frequency simultaneously to reduce energy consumption. Experiments with a number of DSP benchmarks show that the proposed scheme achieves an effective energy reduction.

  14. Combined Rate and Power Allocation with Link Scheduling in Wireless Data Packet Relay Networks with Fading Channels

    Directory of Open Access Journals (Sweden)

    Subhrakanti Dey

    2007-08-01

    Full Text Available We consider a joint rate and power control problem in a wireless data traffic relay network with fading channels. The optimization problem is formulated in terms of power and rate selection, and link transmission scheduling. The objective is to seek high aggregate utility of the relay node when taking into account buffer load management and power constraints. The optimal solution for a single transmitting source is computed by a two-layer dynamic programming algorithm which leads to optimal power, rate, and transmission time allocation at the wireless links. We further consider an optimal power allocation problem for multiple transmitting sources in the same framework. Performances of the resource allocation algorithms including the effect of buffer load control are illustrated via extensive simulation studies.

  15. Deriving Schedules for a Smart Card Personalisation System

    NARCIS (Netherlands)

    Mader, Angelika H.

    We report on an industrial case study on the synthesis of (close) optimal schedules for a smart card personalisation system. The basic technique used is model checking. In most cases, the pure model checking approach has to be enriched by other techniques to fight the state space explosion. Other

  16. Impact of Scheduling Policies on Control System Performance

    DEFF Research Database (Denmark)

    Schiøler, Henrik; Ravn, Anders Peter; Nielsen, Jens Frederik Dalsgaard

    2003-01-01

    It is well known that jitter has an impact on control system performance, and this is often used as an argument for static scheduling policies, e.g. a time triggered architecture. However, it is only completion jitter that seriously disturbs standard linear control algorithms in a way similar to ...

  17. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  18. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  19. Integrated Computing, Communication, and Distributed Control of Deregulated Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Bajura, Richard; Feliachi, Ali

    2008-09-24

    Restructuring of the electricity market has affected all aspects of the power industry from generation to transmission, distribution, and consumption. Transmission circuits, in particular, are stressed often exceeding their stability limits because of the difficulty in building new transmission lines due to environmental concerns and financial risk. Deregulation has resulted in the need for tighter control strategies to maintain reliability even in the event of considerable structural changes, such as loss of a large generating unit or a transmission line, and changes in loading conditions due to the continuously varying power consumption. Our research efforts under the DOE EPSCoR Grant focused on Integrated Computing, Communication and Distributed Control of Deregulated Electric Power Systems. This research is applicable to operating and controlling modern electric energy systems. The controls developed by APERC provide for a more efficient, economical, reliable, and secure operation of these systems. Under this program, we developed distributed control algorithms suitable for large-scale geographically dispersed power systems and also economic tools to evaluate their effectiveness and impact on power markets. Progress was made in the development of distributed intelligent control agents for reliable and automated operation of integrated electric power systems. The methodologies employed combine information technology, control and communication, agent technology, and power systems engineering in the development of intelligent control agents for reliable and automated operation of integrated electric power systems. In the event of scheduled load changes or unforeseen disturbances, the power system is expected to minimize the effects and costs of disturbances and to maintain critical infrastructure operational.

  20. Short term scheduling of multiple grid-parallel PEM fuel cells for microgrid applications

    Energy Technology Data Exchange (ETDEWEB)

    El-Sharkh, M.Y.; Rahman, A.; Alam, M.S. [Dept. of Electrical and Computer Engineering, University of South Alabama, Mobile, AL 36688 (United States)

    2010-10-15

    This paper presents a short term scheduling scheme for multiple grid-parallel PEM fuel cell power plants (FCPPs) connected to supply electrical and thermal energy to a microgrid community. As in the case of regular power plants, short term scheduling of FCPP is also a cost-based optimization problem that includes the cost of operation, thermal power recovery, and the power trade with the local utility grid. Due to the ability of the microgrid community to trade power with the local grid, the power balance constraint is not applicable, other constraints like the real power operating limits of the FCPP, and minimum up and down time are therefore used. To solve the short term scheduling problem of the FCPPs, a hybrid technique based on evolutionary programming (EP) and hill climbing technique (HC) is used. The EP is used to estimate the optimal schedule and the output power from each FCPP. The HC technique is used to monitor the feasibility of the solution during the search process. The short term scheduling problem is used to estimate the schedule and the electrical and thermal power output of five FCPPs supplying a maximum power of 300 kW. (author)

  1. Advanced paratransit system : an application of digital map, automated vehicle scheduling and vehicle location systems

    Science.gov (United States)

    1997-05-01

    This report documents and evaluates an advanced Paratransit system demonstration project. The Santa Clara Valley Transportation Agency (SCVTA), via OUTREACH, implemented such a system, comprised of an automated trip scheduling system (ATSS) and autom...

  2. Retrofit of safety and control systems in nuclear power plants

    International Nuclear Information System (INIS)

    Keiper, J.T.; Fassett, G.B.

    1986-01-01

    The modularity, compactness, compatibility, and licensability of the microcontrol system make it a cost-effective approach to obtain the benefits of digital control technology in the retrofit of nuclear power plants. Retrofit of individual loops or complete systems can be scheduled to meet the operational needs of the plant. The existing racks, panels, and cable systems can be utilized to the maximum extent to minimize the installed cost. Future expansion to total plant control or plant management is supported by the network communication module or gateway. The microcontrol module provides benefits now in improved operation, and future benefits in planned, controlled upgrading

  3. A Web-Remote/Robotic/Scheduled Astronomical Data Acquisition System

    Science.gov (United States)

    Denny, Robert

    2011-03-01

    Traditionally, remote/robotic observatory operating systems have been custom made for each observatory. While data reduction pipelines need to be tailored for each investigation, the data acquisition process (especially for stare-mode optical images) is often quite similar across investigations. Since 1999, DC-3 Dreams has focused on providing and supporting a remote/robotic observatory operating system which can be adapted to a wide variety of physical hardware and optics while achieving the highest practical observing efficiency and safe/secure web browser user controls. ACP Expert consists of three main subsystems: (1) a robotic list-driven data acquisition engine which controls all aspects of the observatory, (2) a constraint-driven dispatch scheduler with a long-term database of requests, and (3) a built-in "zero admin" web server and dynamic web pages which provide a remote capability for immediate execution and monitoring as well as entry and monitoring of dispatch-scheduled observing requests. No remote desktop login is necessary for observing, thus keeping the system safe and consistent. All routine operation is via the web browser. A wide variety of telescope mounts, CCD imagers, guiding sensors, filter selectors, focusers, instrument-package rotators, weather sensors, and dome control systems are supported via the ASCOM standardized device driver architecture. The system is most commonly employed on commercial 1-meter and smaller observatories used by universities and advanced amateurs for both science and art. One current project, the AAVSO Photometric All-Sky Survey (APASS), uses ACP Expert to acquire large volumes of data in dispatch-scheduled mode. In its first 18 months of operation (North then South), 40,307 sky images were acquired in 117 photometric nights, resulting in 12,107,135 stars detected two or more times. These stars had measures in 5 filters. The northern station covered 754 fields (6446 square degrees) at least twice, the southern

  4. A computerized event and maintenance data system at Loviisa nuclear power plant

    International Nuclear Information System (INIS)

    Jankala, K.E.; Saarelainen, P.; Vaurio, J.K.

    1993-01-01

    An on-line failure and maintenance event data system (which is a part of the Loviisa power plant information system) is described as developed and implemented at the Loviisa power plant. The system has been in operation since 1989, and the data base now covers more than 10 years of operation. The system contains a complete unavailability history, i.e. failures, repairs, replacements, scheduled or unscheduled preventive maintenance and periodic testing or service actions for any component that is relevant to plant safety, risk or economic production. The data base provides useful feedback from operating experience and can support e.g. studies on optimal maintenance and testing, planning of spare parts inventory and repair resources, updating of reliability parameters for risk studies, etc. (Z.S.) 4 refs

  5. Congestion management of deregulated power systems by optimal setting of Interline Power Flow Controller using Gravitational Search algorithm

    Directory of Open Access Journals (Sweden)

    Akanksha Mishra

    2017-05-01

    Full Text Available In a deregulated electricity market it may at times become difficult to dispatch all the required power that is scheduled to flow due to congestion in transmission lines. An Interline Power Flow Controller (IPFC can be used to reduce the system loss and power flow in the heavily loaded line, improve stability and loadability of the system. This paper proposes a Disparity Line Utilization Factor for the optimal placement and Gravitational Search algorithm based optimal tuning of IPFC to control the congestion in transmission lines. DLUF ranks the transmission lines in terms of relative line congestion. The IPFC is accordingly placed in the most congested and the least congested line connected to the same bus. Optimal sizing of IPFC is carried using Gravitational Search algorithm. A multi-objective function has been chosen for tuning the parameters of the IPFC. The proposed method is implemented on an IEEE-30 bus test system. Graphical representations have been included in the paper showing reduction in LUF of the transmission lines after the placement of an IPFC. A reduction in active power and reactive power loss of the system by about 6% is observed after an optimally tuned IPFC has been included in the power system. The effectiveness of the proposed tuning method has also been shown in the paper through the reduction in the values of the objective functions.

  6. Optimal Wind Power Uncertainty Intervals for Electricity Market Operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Ying; Zhou, Zhi; Botterud, Audun; Zhang, Kaifeng

    2018-01-01

    It is important to select an appropriate uncertainty level of the wind power forecast for power system scheduling and electricity market operation. Traditional methods hedge against a predefined level of wind power uncertainty, such as a specific confidence interval or uncertainty set, which leaves the questions of how to best select the appropriate uncertainty levels. To bridge this gap, this paper proposes a model to optimize the forecast uncertainty intervals of wind power for power system scheduling problems, with the aim of achieving the best trade-off between economics and reliability. Then we reformulate and linearize the models into a mixed integer linear programming (MILP) without strong assumptions on the shape of the probability distribution. In order to invest the impacts on cost, reliability, and prices in a electricity market, we apply the proposed model on a twosettlement electricity market based on a six-bus test system and on a power system representing the U.S. state of Illinois. The results show that the proposed method can not only help to balance the economics and reliability of the power system scheduling, but also help to stabilize the energy prices in electricity market operation.

  7. Scheduling and Mapping in an Incremental Design Methodology for Distributed Real-Time Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2004-01-01

    In this paper we present an approach to mapping and scheduling of distributed embedded systems for hard real-time applications, aiming at a minimization of the system modification cost. We consider an incremental design process that starts from an already existing system running a set of applicat......In this paper we present an approach to mapping and scheduling of distributed embedded systems for hard real-time applications, aiming at a minimization of the system modification cost. We consider an incremental design process that starts from an already existing system running a set...... be added to the resulted system. Thus, we propose a heuristic which finds the set of already running applications which have to be remapped and rescheduled at the same time with mapping and scheduling the new application, such that the disturbance on the running system (expressed as the total cost implied...... by the modifications) is minimized. Once this set of applications has been determined, we outline a mapping and scheduling algorithm aimed at fulfilling the requirements stated above. The approaches have been evaluated based on extensive experiments using a large number of generated benchmarks as well as a real...

  8. Stochastic analysis of residential micro combined heat and power system

    DEFF Research Database (Denmark)

    Karami, H.; Sanjari, M. J.; Gooi, H. B.

    2017-01-01

    In this paper the combined heat and power functionality of a fuel-cell in a residential hybrid energy system, including a battery, is studied. The demand uncertainties are modeled by investigating the stochastic load behavior by applying Monte Carlo simulation. The colonial competitive algorithm...... algorithm. The optimized scheduling of different energy resources is listed in an efficient look-up table for all time intervals. The effects of time of use and the battery efficiency and its size are investigated on the operating cost of the hybrid energy system. The results of this paper are expected...

  9. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  10. A review on application of neural networks and fuzzy logic to solve hydrothermal scheduling problem

    International Nuclear Information System (INIS)

    Haroon, S.; Malik, T.N.; Zafar, S.

    2014-01-01

    Electrical power system is highly complicated having hydro and thermal mix with large number of machines. To reduce power production cost, hydro and thermal resources are mixed. Hydrothermal scheduling is the optimal coordination of hydro and thermal plants to meet the system load demand at minimum possible operational cost while satisfying the system constraints. Hydrothermal scheduling is dynamic, large scale, non-linear and non-convex optimization problem. The classical techniques have failed in solving such problem. Artificial Intelligence Tools based techniques are used now a day to solve this complex optimization problem because of their no requirements on the nature of the problem. The aim of this research paper is to provide a comprehensive survey of literature related to both Artificial Neural Network (ANN) and Fuzzy Logic (FL) as effective optimization algorithms for the hydrothermal scheduling problem. The outcomes along with the merits and demerits of individual techniques are also discussed. (author)

  11. A multiobjective interval programming model for wind-hydrothermal power system dispatching using 2-step optimization algorithm.

    Science.gov (United States)

    Ren, Kun; Jihong, Qu

    2014-01-01

    Wind-hydrothermal power system dispatching has received intensive attention in recent years because it can help develop various reasonable plans to schedule the power generation efficiency. But future data such as wind power output and power load would not be accurately predicted and the nonlinear nature involved in the complex multiobjective scheduling model; therefore, to achieve accurate solution to such complex problem is a very difficult task. This paper presents an interval programming model with 2-step optimization algorithm to solve multiobjective dispatching. Initially, we represented the future data into interval numbers and simplified the object function to a linear programming problem to search the feasible and preliminary solutions to construct the Pareto set. Then the simulated annealing method was used to search the optimal solution of initial model. Thorough experimental results suggest that the proposed method performed reasonably well in terms of both operating efficiency and precision.

  12. A Multiobjective Interval Programming Model for Wind-Hydrothermal Power System Dispatching Using 2-Step Optimization Algorithm

    Science.gov (United States)

    Jihong, Qu

    2014-01-01

    Wind-hydrothermal power system dispatching has received intensive attention in recent years because it can help develop various reasonable plans to schedule the power generation efficiency. But future data such as wind power output and power load would not be accurately predicted and the nonlinear nature involved in the complex multiobjective scheduling model; therefore, to achieve accurate solution to such complex problem is a very difficult task. This paper presents an interval programming model with 2-step optimization algorithm to solve multiobjective dispatching. Initially, we represented the future data into interval numbers and simplified the object function to a linear programming problem to search the feasible and preliminary solutions to construct the Pareto set. Then the simulated annealing method was used to search the optimal solution of initial model. Thorough experimental results suggest that the proposed method performed reasonably well in terms of both operating efficiency and precision. PMID:24895663

  13. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Pousinho, H.M.I.; Mendes, V.M.F.

    2010-01-01

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.

  14. Radioactive Waste Management System: Draft Project Decision Schedule. Revision

    International Nuclear Information System (INIS)

    1985-07-01

    The Nuclear Waste Policy Act (NWPA) of 1982 (Pub. L. 97-425) requires that the Secretary of Energy prepare, in cooperation with affected Federal agencies, a Project Decision Schedule that portrays the optimum way to attain the operation of geologic repositories. The Draft Project Decision Schedule portrays the major milestones of the Radioactive Waste Management System. It also depicts the set of activities for which Federal agencies have responsibility and the deadlines for taking the required action that are associated with the activities. The NWPA also requires that Federal agencies having determined that they: (1) cannot comply with a deadline for taking a required action; or (2) fail to comply with a deadline contained in the Project Decision Schedule; submit a comprehensive report to the Secretary of Energy and Congress to explain their failure or expected failure. The Secretary, in turn, is required to submit to Congress a response to the agency's report. 7 figs., 13 tabs

  15. Optimal household appliances scheduling under day-ahead pricing and load-shaping demand response strategies

    NARCIS (Netherlands)

    Paterakis, N.G.; Erdinç, O.; Bakirtzis, A.G.; Catalao, J.P.S.

    2015-01-01

    In this paper, a detailed home energy management system structure is developed to determine the optimal dayahead appliance scheduling of a smart household under hourly pricing and peak power-limiting (hard and soft power limitation)-based demand response strategies. All types of controllable assets

  16. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  17. Energy-driven scheduling algorithm for nanosatellite energy harvesting maximization

    Science.gov (United States)

    Slongo, L. K.; Martínez, S. V.; Eiterer, B. V. B.; Pereira, T. G.; Bezerra, E. A.; Paiva, K. V.

    2018-06-01

    The number of tasks that a satellite may execute in orbit is strongly related to the amount of energy its Electrical Power System (EPS) is able to harvest and to store. The manner the stored energy is distributed within the satellite has also a great impact on the CubeSat's overall efficiency. Most CubeSat's EPS do not prioritize energy constraints in their formulation. Unlike that, this work proposes an innovative energy-driven scheduling algorithm based on energy harvesting maximization policy. The energy harvesting circuit is mathematically modeled and the solar panel I-V curves are presented for different temperature and irradiance levels. Considering the models and simulations, the scheduling algorithm is designed to keep solar panels working close to their maximum power point by triggering tasks in the appropriate form. Tasks execution affects battery voltage, which is coupled to the solar panels through a protection circuit. A software based Perturb and Observe strategy allows defining the tasks to be triggered. The scheduling algorithm is tested in FloripaSat, which is an 1U CubeSat. A test apparatus is proposed to emulate solar irradiance variation, considering the satellite movement around the Earth. Tests have been conducted to show that the scheduling algorithm improves the CubeSat energy harvesting capability by 4.48% in a three orbit experiment and up to 8.46% in a single orbit cycle in comparison with the CubeSat operating without the scheduling algorithm.

  18. A Modeling Framework for Schedulability Analysis of Distributed Avionics Systems

    DEFF Research Database (Denmark)

    Han, Pujie; Zhai, Zhengjun; Nielsen, Brian

    2018-01-01

    This paper presents a modeling framework for schedulability analysis of distributed integrated modular avionics (DIMA) systems that consist of spatially distributed ARINC-653 modules connected by a unified AFDX network. We model a DIMA system as a set of stopwatch automata (SWA) in UPPAAL...

  19. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-03-15

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach. (author)

  20. Dynamic Sleep Scheduling on Air Pollution Levels Monitoring with Wireless Sensor Network

    OpenAIRE

    Gezaq Abror; Rusminto Tjatur Widodo; M. Udin Harun Al Rasyid

    2018-01-01

    Wireless Sensor Network (WSN) can be applied for Air Pollution Level Monitoring System that have been determined by the Environmental Impact Management Agency which is  PM10, SO2, O3, NO2 and CO. In WSN, node system is constrained to a limited power supply, so that the node system has a lifetime. To doing lifetime maximization, power management scheme is required and sensor nodes should use energy efficiently. This paper proposes dynamic sleep scheduling using Time Category-Fuzzy Logic (Time-...

  1. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  2. Short-term cascaded hydroelectric system scheduling based on chaotic particle swarm optimization using improved logistic map

    Science.gov (United States)

    He, Yaoyao; Yang, Shanlin; Xu, Qifa

    2013-07-01

    In order to solve the model of short-term cascaded hydroelectric system scheduling, a novel chaotic particle swarm optimization (CPSO) algorithm using improved logistic map is introduced, which uses the water discharge as the decision variables combined with the death penalty function. According to the principle of maximum power generation, the proposed approach makes use of the ergodicity, symmetry and stochastic property of improved logistic chaotic map for enhancing the performance of particle swarm optimization (PSO) algorithm. The new hybrid method has been examined and tested on two test functions and a practical cascaded hydroelectric system. The experimental results show that the effectiveness and robustness of the proposed CPSO algorithm in comparison with other traditional algorithms.

  3. Wind farm fuzzy modelling for adequacy evaluation of power system

    Energy Technology Data Exchange (ETDEWEB)

    Moeini-Aghtaie, M.; Abbaspour, A.; Fotuhi-Firuzabad, M. [Sharif Univ. of Technology, Tehran (Iran, Islamic Republic of). Dept. of Electrical Engineering, Center of Excellence in Power System Management and Control

    2010-07-01

    This paper presented details of a fuzzy logic-based active learning method (ALM) designed to model variations in wind speed. A pattern-based approach was used to model system behaviour. The ALM was algorithmically modelled on the information-handling processes of the human brain. Wind data were gathered and projected on different data planes. The horizontal axis of each data plane was one of the inputs, while the vertical axis was the output. An ink drop spread (IDS) processing engine was used to look for behaviour curves on each data plane. A fuzzy interpolation method was used to derive a smooth curve among the data points. Sequential Monte Carlo simulations (MCS) were used to evaluate power systems based on hourly random simulations. After the hourly wind speed was generated, wind turbine generator outputs were calculated by considering the nonlinear relationship between the estimated wind speed and the wind turbine output. The developed algorithm was validated on a 6-bus reliability test system. Results of the study can be used by power system schedulers to develop power system reliability guidelines. 14 refs., 2 tabs., 11 figs.

  4. Flexibility Driven Scheduling and Mapping for Distributed Real-Time Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2002-01-01

    In this paper we present an approach to mapping and scheduling of distributed hard real-time systems, aiming at improving the flexibility of the design process. We consider an incremental design process that starts from an already existing system running a set of applications, with preemptive...

  5. Gain Scheduling Control based on Closed-Loop System Identification

    DEFF Research Database (Denmark)

    Bendtsen, Jan Dimon; Trangbæk, Klaus

    the first and a second operating point is identified in closed-loop using system identification methods with open-loop properties. Next, a linear controller is designed for this linearised model, and gain scheduling control can subsequently be achieved by interpolating between each controller...

  6. Metaheuristic Based Scheduling Meta-Tasks in Distributed Heterogeneous Computing Systems

    Directory of Open Access Journals (Sweden)

    Hesam Izakian

    2009-07-01

    Full Text Available Scheduling is a key problem in distributed heterogeneous computing systems in order to benefit from the large computing capacity of such systems and is an NP-complete problem. In this paper, we present a metaheuristic technique, namely the Particle Swarm Optimization (PSO algorithm, for this problem. PSO is a population-based search algorithm based on the simulation of the social behavior of bird flocking and fish schooling. Particles fly in problem search space to find optimal or near-optimal solutions. The scheduler aims at minimizing makespan, which is the time when finishes the latest task. Experimental studies show that the proposed method is more efficient and surpasses those of reported PSO and GA approaches for this problem.

  7. Day-Ahead Probabilistic Model for Scheduling the Operation of a Wind Pumped-Storage Hybrid Power Station: Overcoming Forecasting Errors to Ensure Reliability of Supply to the Grid

    Directory of Open Access Journals (Sweden)

    Jakub Jurasz

    2018-06-01

    Full Text Available Variable renewable energy sources (VRES, such as solarphotovoltaic (PV and wind turbines (WT, are starting to play a significant role in several energy systems around the globe. To overcome the problem of their non-dispatchable and stochastic nature, several approaches have been proposed so far. This paper describes a novel mathematical model for scheduling the operation of a wind-powered pumped-storage hydroelectricity (PSH hybrid for 25 to 48 h ahead. The model is based on mathematical programming and wind speed forecasts for the next 1 to 24 h, along with predicted upper reservoir occupancy for the 24th hour ahead. The results indicate that by coupling a 2-MW conventional wind turbine with a PSH of energy storing capacity equal to 54 MWh it is possible to significantly reduce the intraday energy generation coefficient of variation from 31% for pure wind turbine to 1.15% for a wind-powered PSH The scheduling errors calculated based on mean absolute percentage error (MAPE are significantly smaller for such a coupling than those seen for wind generation forecasts, at 2.39% and 27%, respectively. This is even stronger emphasized by the fact that, those for wind generation were calculated for forecasts made for the next 1 to 24 h, while those for scheduled generation were calculated for forecasts made for the next 25 to 48 h. The results clearly show that the proposed scheduling approach ensures the high reliability of the WT–PSH energy source.

  8. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  9. Tail-robust scheduling using Limited Processor Sharing.

    NARCIS (Netherlands)

    Nair, J.K.; Wierman, A.; Zwart, A.P.

    2010-01-01

    From a rare events perspective, scheduling disciplines that work well under light (exponential) tailed workload distributions do not perform well under heavy (power) tailed workload distributions, and vice versa, leading to fundamental problems in designing schedulers that are robust to

  10. Development of an improved installation procedure and schedule of RVI modularization for APR1400

    International Nuclear Information System (INIS)

    Ko, Do Young

    2011-01-01

    The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule

  11. The role of demand response in single and multi-objective wind-thermal generation scheduling: A stochastic programming

    International Nuclear Information System (INIS)

    Falsafi, Hananeh; Zakariazadeh, Alireza; Jadid, Shahram

    2014-01-01

    This paper focuses on using DR (Demand Response) as a means to provide reserve in order to cover uncertainty in wind power forecasting in SG (Smart Grid) environment. The proposed stochastic model schedules energy and reserves provided by both of generating units and responsive loads in power systems with high penetration of wind power. This model is formulated as a two-stage stochastic programming, where first-stage is associated with electricity market, its rules and constraints and the second-stage is related to actual operation of the power system and its physical limitations in each scenario. The discrete retail customer responses to incentive-based DR programs are aggregated by DRPs (Demand Response Providers) and are submitted as a load change price and amount offer package to ISO (Independent System Operator). Also, price-based DR program behavior and random nature of wind power are modeled by price elasticity concept of the demand and normal probability distribution function, respectively. In the proposed model, DRPs can participate in energy market as well as reserve market and submit their offers to the wholesale electricity market. This approach is implemented on a modified IEEE 30-bus test system over a daily time horizon. The simulation results are analyzed in six different case studies. The cost, emission and multiobjective functions are optimized in both without and with DR cases. The multiobjective generation scheduling model is solved using augmented epsilon constraint method and the best solution can be chosen by Entropy and TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) methods. The results indicate demand side participation in energy and reserve scheduling reduces the total operation costs and emissions. - Highlights: • Simultaneous participation of loads in both energy and reserve scheduling. • Environmental/economical scheduling of energy and reserve. • Using demand response for covering wind generation forecast

  12. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  13. Stochastic risk-averse coordinated scheduling of grid integrated energy storage units in transmission constrained wind-thermal systems within a conditional value-at-risk framework

    International Nuclear Information System (INIS)

    Hemmati, Reza; Saboori, Hedayat; Saboori, Saeid

    2016-01-01

    In recent decades, wind power resources have been integrated in the power systems increasingly. Besides confirmed benefits, utilization of large share of this volatile source in power generation portfolio has been faced system operators with new challenges in terms of uncertainty management. It is proved that energy storage systems are capable to handle projected uncertainty concerns. Risk-neutral methods have been proposed in the previous literature to schedule storage units considering wind resources uncertainty. Ignoring risk of the cost distributions with non-desirable properties may result in experiencing high costs in some unfavorable scenarios with high probability. In order to control the risk of the operator decisions, this paper proposes a new risk-constrained two-stage stochastic programming model to make optimal decisions on energy storage and thermal units in a transmission constrained hybrid wind-thermal power system. Risk-aversion procedure is explicitly formulated using the conditional value-at-risk measure, because of possessing distinguished features compared to the other risk measures. The proposed model is a mixed integer linear programming considering transmission network, thermal unit dynamics, and storage devices constraints. The simulations results demonstrate that taking the risk of the problem into account will affect scheduling decisions considerably depend on the level of the risk-aversion. - Highlights: • Risk of the operation decisions is handled by using risk-averse programming. • Conditional value-at-risk is used as risk measure. • Optimal risk level is obtained based on the cost/benefit analysis. • The proposed model is a two-stage stochastic mixed integer linear programming. • The unit commitment is integrated with ESSs and wind power penetration.

  14. Decision support tool for Virtual Power Players: Hybrid Particle Swarm Optimization applied to Day-ahead Vehicle-To-Grid Scheduling

    DEFF Research Database (Denmark)

    Soares, João; Valle, Zita; Morais, Hugo

    2013-01-01

    This paper presents a decision support Tool methodology to help virtual power players (VPPs) in the Smart Grid (SGs) context to solve the day-ahead energy ressource scheduling considering the intensive use of Distributed Generation (DG) and Vehicle-To-Grid (V2G). The main focus is the application...... of a new hybrid method combing a particle swarm approach and a deterministic technique based on mixedinteger linear programming (MILP) to solve the day-ahead scheduling minimizing total operation costs from the aggregator point of view. A realistic mathematical formulation, considering the electric network...... constraints and V2G charging and discharging efficiencies is presented. Full AC power flow calculation is included in the hybrid method to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance...

  15. A derived heuristics based multi-objective optimization procedure for micro-grid scheduling

    Science.gov (United States)

    Li, Xin; Deb, Kalyanmoy; Fang, Yanjun

    2017-06-01

    With the availability of different types of power generators to be used in an electric micro-grid system, their operation scheduling as the load demand changes with time becomes an important task. Besides satisfying load balance constraints and the generator's rated power, several other practicalities, such as limited availability of grid power and restricted ramping of power output from generators, must all be considered during the operation scheduling process, which makes it difficult to decide whether the optimization results are accurate and satisfactory. In solving such complex practical problems, heuristics-based customized optimization algorithms are suggested. However, due to nonlinear and complex interactions of variables, it is difficult to come up with heuristics in such problems off-hand. In this article, a two-step strategy is proposed in which the first task deciphers important heuristics about the problem and the second task utilizes the derived heuristics to solve the original problem in a computationally fast manner. Specifically, the specific operation scheduling is considered from a two-objective (cost and emission) point of view. The first task develops basic and advanced level knowledge bases offline from a series of prior demand-wise optimization runs and then the second task utilizes them to modify optimized solutions in an application scenario. Results on island and grid connected modes and several pragmatic formulations of the micro-grid operation scheduling problem clearly indicate the merit of the proposed two-step procedure.

  16. Hybrid PV/diesel solar power system design using multi-level factor analysis optimization

    Science.gov (United States)

    Drake, Joshua P.

    Solar power systems represent a large area of interest across a spectrum of organizations at a global level. It was determined that a clear understanding of current state of the art software and design methods, as well as optimization methods, could be used to improve the design methodology. Solar power design literature was researched for an in depth understanding of solar power system design methods and algorithms. Multiple software packages for the design and optimization of solar power systems were analyzed for a critical understanding of their design workflow. In addition, several methods of optimization were studied, including brute force, Pareto analysis, Monte Carlo, linear and nonlinear programming, and multi-way factor analysis. Factor analysis was selected as the most efficient optimization method for engineering design as it applied to solar power system design. The solar power design algorithms, software work flow analysis, and factor analysis optimization were combined to develop a solar power system design optimization software package called FireDrake. This software was used for the design of multiple solar power systems in conjunction with an energy audit case study performed in seven Tibetan refugee camps located in Mainpat, India. A report of solar system designs for the camps, as well as a proposed schedule for future installations was generated. It was determined that there were several improvements that could be made to the state of the art in modern solar power system design, though the complexity of current applications is significant.

  17. Probabilistic methods of optimization of scheduled tests for heat equipment of safety systems of reactor at full power

    International Nuclear Information System (INIS)

    Bilej, D.V.; Fridman, N.A.; Kolykhanov, V.N.; Skalozubov, V.I.

    2004-01-01

    This article generalises the basic results of a long-term teamwork with respect to a scientific and technical substantiation of perfection of the regulations of safe operation power units with VVER. This perfection is concerning a periodicity and volumes of tests of safety systems when a reactor works at full power. The article shows that the application of the probabilistic approaches connected to minimisation of a risk criterion function is an effective methodical base for the optimisation. For certain safety systems of serial power units with VVER 1000 the results of calculated substantiations are presented

  18. BPA review of Washington Public Power Supply System, Projects 1 and 3 (WNP 1 and 3), construction schedule and financing assumptions

    International Nuclear Information System (INIS)

    1984-01-01

    This document contains the following appendices: Data provided By Supply System Regarding Costs and Schedules; Basic Supply System Data and Assumptions; Detailed Modeling of Net Present Values; Origin and Detailed Description of the System Analysis Mode; Decision Analysis Model; Pro Forma Budget Expenditure Levels for Fiscal years 1984 through 1990; Financial Flexibility Analysis - Discretionary/Nondiscretionary Expenditure Levels; Detailed Analysis of BPA's Debt Structure Under the 13 Pro Forma Budget Scenarios for Fiscal Years 1984 through 1990; Wertheim and Co., Inc., August 30, 1984 Letter; Project Considerations and Licensing/Regulatory Issues, Supply System September 15, 1984 Letter; and Summary of Litigation Affecting WNP 1 and 3, and WNP 4 and 5

  19. Improved Weather Forecasting for the Dynamic Scheduling System of the Green Bank Telescope

    Science.gov (United States)

    Henry, Kari; Maddalena, Ronald

    2018-01-01

    The Robert C Byrd Green Bank Telescope (GBT) uses a software system that dynamically schedules observations based on models of vertical weather forecasts produced by the National Weather Service (NWS). The NWS provides hourly forecasted values for ~60 layers that extend into the stratosphere over the observatory. We use models, recommended by the Radiocommunication Sector of the International Telecommunications Union, to derive the absorption coefficient in each layer for each hour in the NWS forecasts and for all frequencies over which the GBT has receivers, 0.1 to 115 GHz. We apply radiative transfer models to derive the opacity and the atmospheric contributions to the system temperature, thereby deriving forecasts applicable to scheduling radio observations for up to 10 days into the future. Additionally, the algorithms embedded in the data processing pipeline use historical values of the forecasted opacity to calibrate observations. Until recently, we have concentrated on predictions for high frequency (> 15 GHz) observing, as these need to be scheduled carefully around bad weather. We have been using simple models for the contribution of rain and clouds since we only schedule low-frequency observations under these conditions. In this project, we wanted to improve the scheduling of the GBT and data calibration at low frequencies by deriving better algorithms for clouds and rain. To address the limitation at low frequency, the observatory acquired a Radiometrics Corporation MP-1500A radiometer, which operates in 27 channels between 22 and 30 GHz. By comparing 16 months of measurements from the radiometer against forecasted system temperatures, we have confirmed that forecasted system temperatures are indistinguishable from those measured under good weather conditions. Small miss-calibrations of the radiometer data dominate the comparison. By using recalibrated radiometer measurements, we looked at bad weather days to derive better models for forecasting the

  20. Optimization of scheduling system for plant watering using electric cars in agro techno park

    Science.gov (United States)

    Oktavia Adiwijaya, Nelly; Herlambang, Yudha; Slamin

    2018-04-01

    Agro Techno Park in University of Jember is a special area used for the development of agriculture, livestock and fishery. In this plantation, the process of watering the plants is according to the frequency of each plant needs. This research develops the optimization of plant watering scheduling system using edge coloring of graph. This research was conducted in 3 stages, namely, data collection phase, analysis phase, and system development stage. The collected data was analyzed and then converted into a graph by using bipartite adjacency matrix representation. The development phase is conducted to build a web-based watering schedule optimization system. The result of this research showed that the schedule system is optimal because it can maximize the use of all electric cars to water the plants and minimize the number of idle cars.

  1. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  2. Minimization of Load Variance in Power Grids—Investigation on Optimal Vehicle-to-Grid Scheduling

    DEFF Research Database (Denmark)

    Tan, Kang Miao; Ramachandaramurthy, Vigna K.; Yong, Jia Ying

    2017-01-01

    -to-grid optimization algorithm is implemented and tested in MATLAB software (R2013a, MathWorks, Natick, MA, USA). The performance of the optimization algorithm depends heavily on the setting of the target load, power grid load and capability of the grid-connected electric vehicles. Hence, the performance...... of the proposed algorithm under various target load and electric vehicles’ state of charge selections were analysed. The effectiveness of the vehicle-to-grid scheduling to implement the appropriate peak load shaving and load levelling services for the grid load variance minimization is verified under various...

  3. Enhanced Discrete-Time Scheduler Engine for MBMS E-UMTS System Level Simulator

    DEFF Research Database (Denmark)

    Pratas, Nuno; Rodrigues, António

    2007-01-01

    In this paper the design of an E-UMTS system level simulator developed for the study of optimization methods for the MBMS is presented. The simulator uses a discrete event based philosophy, which captures the dynamic behavior of the Radio Network System. This dynamic behavior includes the user...... mobility, radio interfaces and the Radio Access Network. Its given emphasis on the enhancements developed for the simulator core, the Event Scheduler Engine. Two implementations for the Event Scheduler Engine are proposed, one optimized for single core processors and other for multi-core ones....

  4. Day-ahead stochastic economic dispatch of wind integrated power system considering demand response of residential hybrid energy system

    International Nuclear Information System (INIS)

    Jiang, Yibo; Xu, Jian; Sun, Yuanzhang; Wei, Congying; Wang, Jing; Ke, Deping; Li, Xiong; Yang, Jun; Peng, Xiaotao; Tang, Bowen

    2017-01-01

    Highlights: • Improving the utilization of wind power by the demand response of residential hybrid energy system. • An optimal scheduling of home energy management system integrating micro-CHP. • The scattered response capability of consumers is aggregated by demand bidding curve. • A stochastic day-ahead economic dispatch model considering demand response and wind power. - Abstract: As the installed capacity of wind power is growing, the stochastic variability of wind power leads to the mismatch of demand and generated power. Employing the regulating capability of demand to improve the utilization of wind power has become a new research direction. Meanwhile, the micro combined heat and power (micro-CHP) allows residential consumers to choose whether generating electricity by themselves or purchasing from the utility company, which forms a residential hybrid energy system. However, the impact of the demand response with hybrid energy system contained micro-CHP on the large-scale wind power utilization has not been analyzed quantitatively. This paper proposes an operation optimization model of the residential hybrid energy system based on price response, integrating micro-CHP and smart appliances intelligently. Moreover, a novel load aggregation method is adopted to centralize scattered response capability of residential load. At the power grid level, a day-ahead stochastic economic dispatch model considering demand response and wind power is constructed. Furthermore, simulation is conducted respectively on the modified 6-bus system and IEEE 118-bus system. The results show that with the method proposed, the wind power curtailment of the system decreases by 78% in 6-bus system. In the meantime, the energy costs of residential consumers and the operating costs of the power system reduced by 10.7% and 11.7% in 118-bus system, respectively.

  5. Selectivity of power system protections at power swings in power system

    Directory of Open Access Journals (Sweden)

    Jan Machowski

    2012-12-01

    Full Text Available The paper discusses out-of-step protection systems such as: generator pole slip protections, out of step tripping protections, distance protections of step-up transformer, distance protections of transmission lines and transformers, power swing blocking, and special out-of-step protection. It is shown that all these protections make up a protection system, to which a setting concept uniform for the entire power system has to be applied. If a power system is inappropriately equipped with these protections, or their settings are inappropriate, they may operate unselectively, thus contributing to the development of power system blackouts. In the paper the concepts for a real power system are given for the two stages: target stage fully compliant with selectivity criteria, and transitional stage between the current and target stages.

  6. Initial examination of the effects of overtime and shift scheduling on nuclear power plant safety performance

    International Nuclear Information System (INIS)

    Baker, K.; Olson, J.; Montgomery, J.

    1990-01-01

    The research reported here uses currently available data to begin to document overtime and shift scheduling practices in the nuclear industry and assess their safety consequences. Overtime and the 12-hour shift schedule have been found to affect employee fatigue and human error in other industries but neither of these practices have been systematically researched within the nuclear industry. Overtime has long been a standard practice in the nuclear industry and, recently, several licensees have adopted a 12-hour shift schedule for control room operations crews. Although 12-hour shifts have certain benefits for the employer and employee alike (e.g., can require fewer total employees and provide longer periods of time-off) there is some concern that the 12-hour shift may produce greater employee fatigue. Moreover, the 12-hour shift may exacerbate the negative effect of overtime. The potential effect of human error in the nuclear industry for the health and safety of both nuclear power plant workers and the general public requires that these practices be assessed. Data on overtime practices was obtained from the International Brotherhood of Electrical Workers (IBEW) for plants covered by the bargaining unit - approximately 63% of the total number of operating plants. Information on operator shift schedule was collected from all operating plants in 1987 by the NRC. The research produced fairly strong evidence that greater amounts of overtime worked by operators is associated with a greater number of operational problems

  7. Degree of Schedulability of Mixed-Criticality Real-time Systems with Probabilistic Sporadic Tasks

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun

    2014-01-01

    We present the concept of degree of schedulability for mixed-criticality scheduling systems. This concept is given in terms of the two factors 1) Percentage of Missed Deadlines (PoMD), and 2) Degradation of the Quality of Service (DoQoS). The novel aspect is that we consider task arrival patterns...

  8. A distributed control approach for power and energy management in a notional shipboard power system

    Science.gov (United States)

    Shen, Qunying

    The main goal of this thesis is to present a power control module (PCON) based approach for power and energy management and to examine its control capability in shipboard power system (SPS). The proposed control scheme is implemented in a notional medium voltage direct current (MVDC) integrated power system (IPS) for electric ship. To realize the control functions such as ship mode selection, generator launch schedule, blackout monitoring, and fault ride-through, a PCON based distributed power and energy management system (PEMS) is developed. The control scheme is proposed as two-layer hierarchical architecture with system level on the top as the supervisory control and zonal level on the bottom as the decentralized control, which is based on the zonal distribution characteristic of the notional MVDC IPS that was proposed as one of the approaches for Next Generation Integrated Power System (NGIPS) by Norbert Doerry. Several types of modules with different functionalities are used to derive the control scheme in detail for the notional MVDC IPS. Those modules include the power generation module (PGM) that controls the function of generators, the power conversion module (PCM) that controls the functions of DC/DC or DC/AC converters, etc. Among them, the power control module (PCON) plays a critical role in the PEMS. It is the core of the control process. PCONs in the PEMS interact with all the other modules, such as power propulsion module (PPM), energy storage module (ESM), load shedding module (LSHED), and human machine interface (HMI) to realize the control algorithm in PEMS. The proposed control scheme is implemented in real time using the real time digital simulator (RTDS) to verify its validity. To achieve this, a system level energy storage module (SESM) and a zonal level energy storage module (ZESM) are developed in RTDS to cooperate with PCONs to realize the control functionalities. In addition, a load shedding module which takes into account the reliability

  9. Schedulability-Driven Partitioning and Mapping for Multi-Cluster Real-Time Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2004-01-01

    We present an approach to partitioning and mapping for multi-cluster embedded systems consisting of time-triggered and event-triggered clusters, interconnected via gateways. We have proposed a schedulability analysis for such systems, including a worst-case queuing delay analysis for the gateways...

  10. Constraint optimization model of a scheduling problem for a robotic arm in automatic systems

    DEFF Research Database (Denmark)

    Kristiansen, Ewa; Smith, Stephen F.; Kristiansen, Morten

    2014-01-01

    are characteristics of the painting process application itself. Unlike spot-welding, painting tasks require movement of the entire robot arm. In addition to minimizing intertask duration, the scheduler must strive to maximize painting quality and the problem is formulated as a multi-objective optimization problem....... The scheduling model is implemented as a stand-alone module using constraint programming, and integrated with a larger automatic system. The results of a number of simulation experiments with simple parts are reported, both to characterize the functionality of the scheduler and to illustrate the operation...... of the entire software system for automatic generation of robot programs for painting....

  11. TCSC control structures for line power scheduling and methods to determine their location and tuning to damp system oscillations

    Energy Technology Data Exchange (ETDEWEB)

    Martins, N; Pinto, H J.C.P.; Bianco, A [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Macedo, N J.P. [FURNAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper describes control structures and computer methods to enhance the practical use of thyristor controlled series compensation (TCSC) in power systems. The location and controller design of the TCS devices, to damp system oscillations, are based on modal analysis and frequency response techniques, respectively. Results are given for a large practical power system. (author) 15 refs., 18 figs., 5 tabs.

  12. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  13. Synthesis of Communication Schedules for TTEthernet-Based Mixed-Criticality Systems

    DEFF Research Database (Denmark)

    Tamas-Selicean, Domitian; Pop, Paul; Steiner, Wilfried

    2012-01-01

    In this paper we are interested in safety-critical distributed systems, composed of heterogeneous processing elements interconnected using the TTEthernet protocol. We address hard real-time mixed-criticality applications, which may have different criticality levels, and we focus on the optimization...... be integrated onto the same architecture only if there is enough spatial and temporal separation among them. TTEthernet offers spatial separation for mixed-criticality messages through the concept of virtual links, and temporal separation, enforced through schedule tables for TT messages and bandwidth...... allocation for RC messages. Given the set of mixed-criticality messages in the system and the topology of the virtual links on which the messages are transmitted, we are interested to synthesize offline the static schedules for the TT messages, such that the deadlines for the TT and RC messages are satisfied...

  14. Conceptual design and implementation of Pulse Automation and Scheduling System for KSTAR

    International Nuclear Information System (INIS)

    Lee, Woongryol; Lee, Taegu; Park, Jinseop; Hong, Jaesic; Hahn, Sanghee; Han, Hyunsun; Woo, Minho; Park, Kaprai

    2015-01-01

    Highlights: • The world clock based automatic sequential operation manipulator. • Configuration of the Pulse Automation System (PAS) and the Pulse Scheduling System (PSS) • Providing of operational information in voice through an Ethernet interface. • A perceptional operation status, easy time manipulator, and intuitive man machine interface for the purpose of the Tokamak operation. • Generation of the plasma disruption information. - Abstract: The world clock based automatic sequential operation manipulator has been developed and begin to work on the 7th campaign in KSTAR Tokamak. The Pulse Automation and Scheduling System (PASS) divided into Pulse Automation System (PAS) and Pulse Scheduling System (PSS). The PAS is on the online control system and it has communicated with many other local control systems. Before PASS, the plasma experiment was performed manually by using Central Control System (CCS). However the PASS currently manipulates the sequential operation of KSTAR with the programmed shot interval time. It provides readiness check routine, shot time handler, and local system monitoring functions. The PASS has no hardware dependency and it was configured with EPICS extensions. The Real Time Monitoring System, PCS-GATE, Automatic Reporting System, Central Control System, and Timing Synchronization System are well organized and they communicate to each other. The PASS provides perceptual operation status, easy time manipulator, and intuitive man machine interface. The plasma disruption information which is used in the KSTAR standard software framework also comes from the PASS. We describe the functions and system architecture of the Pulse Automation System in this paper. The PSS will be specified inside PASS for the purpose of intelligent system parameterization.

  15. Conceptual design and implementation of Pulse Automation and Scheduling System for KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Park, Jinseop; Hong, Jaesic; Hahn, Sanghee; Han, Hyunsun; Woo, Minho; Park, Kaprai

    2015-10-15

    Highlights: • The world clock based automatic sequential operation manipulator. • Configuration of the Pulse Automation System (PAS) and the Pulse Scheduling System (PSS) • Providing of operational information in voice through an Ethernet interface. • A perceptional operation status, easy time manipulator, and intuitive man machine interface for the purpose of the Tokamak operation. • Generation of the plasma disruption information. - Abstract: The world clock based automatic sequential operation manipulator has been developed and begin to work on the 7th campaign in KSTAR Tokamak. The Pulse Automation and Scheduling System (PASS) divided into Pulse Automation System (PAS) and Pulse Scheduling System (PSS). The PAS is on the online control system and it has communicated with many other local control systems. Before PASS, the plasma experiment was performed manually by using Central Control System (CCS). However the PASS currently manipulates the sequential operation of KSTAR with the programmed shot interval time. It provides readiness check routine, shot time handler, and local system monitoring functions. The PASS has no hardware dependency and it was configured with EPICS extensions. The Real Time Monitoring System, PCS-GATE, Automatic Reporting System, Central Control System, and Timing Synchronization System are well organized and they communicate to each other. The PASS provides perceptual operation status, easy time manipulator, and intuitive man machine interface. The plasma disruption information which is used in the KSTAR standard software framework also comes from the PASS. We describe the functions and system architecture of the Pulse Automation System in this paper. The PSS will be specified inside PASS for the purpose of intelligent system parameterization.

  16. Scheduling algorithm for data relay satellite optical communication based on artificial intelligent optimization

    Science.gov (United States)

    Zhao, Wei-hu; Zhao, Jing; Zhao, Shang-hong; Li, Yong-jun; Wang, Xiang; Dong, Yi; Dong, Chen

    2013-08-01

    Optical satellite communication with the advantages of broadband, large capacity and low power consuming broke the bottleneck of the traditional microwave satellite communication. The formation of the Space-based Information System with the technology of high performance optical inter-satellite communication and the realization of global seamless coverage and mobile terminal accessing are the necessary trend of the development of optical satellite communication. Considering the resources, missions and restraints of Data Relay Satellite Optical Communication System, a model of optical communication resources scheduling is established and a scheduling algorithm based on artificial intelligent optimization is put forwarded. According to the multi-relay-satellite, multi-user-satellite, multi-optical-antenna and multi-mission with several priority weights, the resources are scheduled reasonable by the operation: "Ascertain Current Mission Scheduling Time" and "Refresh Latter Mission Time-Window". The priority weight is considered as the parameter of the fitness function and the scheduling project is optimized by the Genetic Algorithm. The simulation scenarios including 3 relay satellites with 6 optical antennas, 12 user satellites and 30 missions, the simulation result reveals that the algorithm obtain satisfactory results in both efficiency and performance and resources scheduling model and the optimization algorithm are suitable in multi-relay-satellite, multi-user-satellite, and multi-optical-antenna recourses scheduling problem.

  17. Reliable gain-scheduled control of discrete-time systems and its application to CSTR model

    Science.gov (United States)

    Sakthivel, R.; Selvi, S.; Mathiyalagan, K.; Shi, Y.

    2016-10-01

    This paper is focused on reliable gain-scheduled controller design for a class of discrete-time systems with randomly occurring nonlinearities and actuator fault. Further, the nonlinearity in the system model is assumed to occur randomly according to a Bernoulli distribution with measurable time-varying probability in real time. The main purpose of this paper is to design a gain-scheduled controller by implementing a probability-dependent Lyapunov function and linear matrix inequality (LMI) approach such that the closed-loop discrete-time system is stochastically stable for all admissible randomly occurring nonlinearities. The existence conditions for the reliable controller is formulated in terms of LMI constraints. Finally, the proposed reliable gain-scheduled control scheme is applied on continuously stirred tank reactor model to demonstrate the effectiveness and applicability of the proposed design technique.

  18. Protocol-transparent resource sharing in hierarchically scheduled real-time systems

    NARCIS (Netherlands)

    Heuvel, van den M.M.H.P.; Bril, R.J.; Lukkien, J.J.

    2010-01-01

    Hierarchical scheduling frameworks (HSFs) provide means for composing complex real-time systems from well-defined, independently analyzed subsystems. To support resource sharing within two-level HSFs, three synchronization protocols based on the stack resource policy (SRP) have recently been

  19. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  20. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  1. Sort-Mid tasks scheduling algorithm in grid computing.

    Science.gov (United States)

    Reda, Naglaa M; Tawfik, A; Marzok, Mohamed A; Khamis, Soheir M

    2015-11-01

    Scheduling tasks on heterogeneous resources distributed over a grid computing system is an NP-complete problem. The main aim for several researchers is to develop variant scheduling algorithms for achieving optimality, and they have shown a good performance for tasks scheduling regarding resources selection. However, using of the full power of resources is still a challenge. In this paper, a new heuristic algorithm called Sort-Mid is proposed. It aims to maximizing the utilization and minimizing the makespan. The new strategy of Sort-Mid algorithm is to find appropriate resources. The base step is to get the average value via sorting list of completion time of each task. Then, the maximum average is obtained. Finally, the task has the maximum average is allocated to the machine that has the minimum completion time. The allocated task is deleted and then, these steps are repeated until all tasks are allocated. Experimental tests show that the proposed algorithm outperforms almost other algorithms in terms of resources utilization and makespan.

  2. Short-term bulk energy storage system scheduling for load leveling in unit commitment: modeling, optimization, and sensitivity analysis

    Science.gov (United States)

    Hemmati, Reza; Saboori, Hedayat

    2016-01-01

    Energy storage systems (ESSs) have experienced a very rapid growth in recent years and are expected to be a promising tool in order to improving power system reliability and being economically efficient. The ESSs possess many potential benefits in various areas in the electric power systems. One of the main benefits of an ESS, especially a bulk unit, relies on smoothing the load pattern by decreasing on-peak and increasing off-peak loads, known as load leveling. These devices require new methods and tools in order to model and optimize their effects in the power system studies. In this respect, this paper will model bulk ESSs based on the several technical characteristics, introduce the proposed model in the thermal unit commitment (UC) problem, and analyze it with respect to the various sensitive parameters. The technical limitations of the thermal units and transmission network constraints are also considered in the model. The proposed model is a Mixed Integer Linear Programming (MILP) which can be easily solved by strong commercial solvers (for instance CPLEX) and it is appropriate to be used in the practical large scale networks. The results of implementing the proposed model on a test system reveal that proper load leveling through optimum storage scheduling leads to considerable operation cost reduction with respect to the storage system characteristics. PMID:27222741

  3. Short-term bulk energy storage system scheduling for load leveling in unit commitment: modeling, optimization, and sensitivity analysis.

    Science.gov (United States)

    Hemmati, Reza; Saboori, Hedayat

    2016-05-01

    Energy storage systems (ESSs) have experienced a very rapid growth in recent years and are expected to be a promising tool in order to improving power system reliability and being economically efficient. The ESSs possess many potential benefits in various areas in the electric power systems. One of the main benefits of an ESS, especially a bulk unit, relies on smoothing the load pattern by decreasing on-peak and increasing off-peak loads, known as load leveling. These devices require new methods and tools in order to model and optimize their effects in the power system studies. In this respect, this paper will model bulk ESSs based on the several technical characteristics, introduce the proposed model in the thermal unit commitment (UC) problem, and analyze it with respect to the various sensitive parameters. The technical limitations of the thermal units and transmission network constraints are also considered in the model. The proposed model is a Mixed Integer Linear Programming (MILP) which can be easily solved by strong commercial solvers (for instance CPLEX) and it is appropriate to be used in the practical large scale networks. The results of implementing the proposed model on a test system reveal that proper load leveling through optimum storage scheduling leads to considerable operation cost reduction with respect to the storage system characteristics.

  4. Comparison of genetic algorithm and harmony search for generator maintenance scheduling

    International Nuclear Information System (INIS)

    Khan, L.; Mumtaz, S.; Khattak, A.

    2012-01-01

    GMS (Generator Maintenance Scheduling) ranks very high in decision making of power generation management. Generators maintenance schedule decides the time period of maintenance tasks and a reliable reserve margin is also maintained during this time period. In this paper, a comparison of GA (Genetic Algorithm) and US (Harmony Search) algorithm is presented to solve generators maintenance scheduling problem for WAPDA (Water And Power Development Authority) Pakistan. GA is a search procedure, which is used in search problems to compute exact and optimized solution. GA is considered as global search heuristic technique. HS algorithm is quite efficient, because the convergence rate of this algorithm is very fast. HS algorithm is based on the concept of music improvisation process of searching for a perfect state of harmony. The two algorithms generate feasible and optimal solutions and overcome the limitations of the conventional methods including extensive computational effort, which increases exponentially as the size of the problem increases. The proposed methods are tested, validated and compared on the WAPDA electric system. (author)

  5. Joint Design of Control and Power Efficiency in Wireless Networked Control System

    Directory of Open Access Journals (Sweden)

    Yan Wang

    2014-01-01

    Full Text Available This paper presents a joint design method for wireless networked control system (WNCS to balance both the demands of network service and the control performance. Since the problems of power consumption, communication reliability, and system stability exist simultaneously and interdependently in WNCS, most of the achieved results in the wireless network and wired networked control system cannot be used directly. To coordinate the three problems, sampling period is found to be the linking bridge. An adaptive sampling power efficiency algorithm is proposed to manage the power consumption such that it can meet the demands of network life span. The sampling period is designed to update periodically on the constraints of network schedulability and system stability. The convergence of the power efficiency algorithm is further proved. The sampling period is no longer a fixed value, however; thus, increasing the difficulty in modeling and controlling such a complicated time-varying system remains. In this work, a switched control system scheme is applied to model such a WNCS, and the effect of network-induced delay is considered. Switched feedback controllers are introduced to stabilize the WNCS, and some considerations on stability condition and the bounds of the update circle for renewing sampling period are discussed. A numerical example shows the effectiveness of the proposed method.

  6. A hybrid method of incorporating extended priority list into equal incremental principle for energy-saving generation dispatch of thermal power systems

    International Nuclear Information System (INIS)

    Cheng, Chuntian; Li, Shushan; Li, Gang

    2014-01-01

    The energy-saving generation dispatch (ESGD) policy released by Chinese Government in 2007 is a new code for optimally dispatching electric power generation portfolio in the country with the dual objectives of improving energy efficiency and reducing environmental pollution. The ESGD is substantially different from the competitive market in the developed economies, the traditional economic dispatching or the rational dispatching principle implemented in China prior to the new policy. This paper develops a hybrid method that integrates the extended priority list (EPL), the equal incremental principle (EIP) and a heuristic method to optimize daily generation schedules under ESGD. The EPL is presented to search desirable units set that satisfies the complicated duration period requirements based on thermal unit generation priority list. The EIP is developed to allocate load among the committed units within the combined set. A heuristic method is proposed to deal with inequality constraints, which usually result in difficulty for power allocation, and used to improve these results. The algorithm has been embedded into a newly developed decision support system that is currently being used by operators of the Guizhou Province Power Grid to make day-ahead quarter-hourly generation schedules. - Highlights: • Electric power industry is one of key and important fields for energy conservation and emission reduction in China. • The energy-saving generation dispatch policy was released by Chinese government in 2007. • A Hybrid algorithm for energy-saving generation dispatch scheduling of thermal power system is presented. • The algorithm has been embedded into a newly developed decision support system

  7. Modeling and power system stability of VSC-HVDC systems for grid-connection of large offshore windfarms

    Energy Technology Data Exchange (ETDEWEB)

    Xue Yijing [Vestas China, Beijing (China); Akhmatov, Vladislav [Technical Univ. of Denmark, Lyngby (Denmark). Centre for Electric Technology

    2009-07-01

    Utilization of Voltage Source Converter (VSC) - High Voltage Direct Current (HVDC) systems for grid-connection of large offshore windfarms becomes relevant as installed power capacities as well as distances to the connection points of on-land transmission systems increase. At the same time, the grid code requirements of the Transmission System Operators (TSO), including ancillary system services and Low-Voltage Fault-Ride-Through (LVFRT) capability of large offshore windfarms, become more demanding. This paper presents a general-level model of and a LVFRT solution for a VSC-HVDC system for grid-connection of large offshore windfarms. The VSC-HVDC model is implemented using a general approach of independent control of active and reactive power in normal operations. The on-land VSC inverter, i.e. a grid-side inverter, provides voltage support to the transmission system and comprises a LVFRT solution in short-circuit faults. The presented model, LVFRT solution and impact on the system stability are investigated as a case study of a 1,000 MW offshore windfarm grid-connected through a VSC-HVDC system. The investigation is carried out on a model of the west Danish, with some elements of the north German, 400 kV, 220 kV and 150 kV transmission systems stage 2005-2006 using the DIgSILENT PowerFactory simulation program. In the investigation, a thermal power plant just south to the Danish border has been substituted by this 1,000 MW offshore windfarm utilizing the VSC-HVDC system. The investigation has shown that the substitution of a thermal power plant by a VSC-HVDC connected offshore windfarm should not have any negative impact on the short-term stability of the west Danish transmission system. The investigation should be repeated applying updated system model stages and offshore wind power commissioning schedules in the North and Baltic Seas. (orig.)

  8. Autonomous power networks based power system

    International Nuclear Information System (INIS)

    Jokic, A.; Van den Bosch, P.P.J.

    2006-01-01

    This paper presented the concept of autonomous networks to cope with this increased complexity in power systems while enhancing market-based operation. The operation of future power systems will be more challenging and demanding than present systems because of increased uncertainties, less inertia in the system, replacement of centralized coordinating activities by decentralized parties and the reliance on dynamic markets for both power balancing and system reliability. An autonomous network includes the aggregation of networked producers and consumers in a relatively small area with respect to the overall system. The operation of an autonomous network is coordinated and controlled with one central unit acting as an interface between internal producers/consumers and the rest of the power system. In this study, the power balance problem and system reliability through provision of ancillary services was formulated as an optimization problem for the overall autonomous networks based power system. This paper described the simulation of an optimal autonomous network dispatching in day ahead markets, based on predicted spot prices for real power, and two ancillary services. It was concluded that large changes occur in a power systems structure and operation, most of them adding to the uncertainty and complexity of the system. The introduced concept of an autonomous power network-based power system was shown to be a realistic and consistent approach to formulate and operate a market-based dispatch of both power and ancillary services. 9 refs., 4 figs

  9. Adaptive Radio Resource Allocation in Hierarchical QoS Scheduling for IEEE 802.16 Systems

    DEFF Research Database (Denmark)

    Wang, Hua; Dittmann, Lars

    2007-01-01

    Future mobile communication systems such as IEEE 802.16 are expected to deliver a variety of multimedia services with diverse QoS requirements. To guarantee the QoS provision, appropriate scheduler architecture and scheduling algorithms have to be carefully designed. In this paper, we propose...

  10. Robust Optimization-Based Generation Self-Scheduling under Uncertain Price

    Directory of Open Access Journals (Sweden)

    Xiao Luo

    2011-01-01

    Full Text Available This paper considers generation self-scheduling in electricity markets under uncertain price. Based on the robust optimization (denoted as RO methodology, a new self-scheduling model, which has a complicated max-min optimization structure, is set up. By using optimal dual theory, the proposed model is reformulated to an ordinary quadratic and quadratic cone programming problems in the cases of box and ellipsoidal uncertainty, respectively. IEEE 30-bus system is used to test the new model. Some comparisons with other methods are done, and the sensitivity with respect to the uncertain set is analyzed. Comparing with the existed uncertain self-scheduling approaches, the new method has twofold characteristics. First, it does not need a prediction of distribution of random variables and just requires an estimated value and the uncertain set of power price. Second, the counterpart of RO corresponding to the self-scheduling is a simple quadratic or quadratic cone programming. This indicates that the reformulated problem can be solved by many ordinary optimization algorithms.

  11. Optimal joint scheduling of electrical and thermal appliances in a smart home environment

    International Nuclear Information System (INIS)

    Shirazi, Elham; Zakariazadeh, Alireza; Jadid, Shahram

    2015-01-01

    Highlights: • Thermal appliances are scheduled based on desired temperature and energy prices. • A discomfort index has been introduced within the home energy scheduling model. • Appliances are scheduled based on activity probability and desired options. • Starting probability depends on the social random factor and consumption behavior. - Abstract: With the development of home area network, residents have the opportunity to schedule their power usage in the home by themselves aiming at reducing electricity expenses. Moreover, as renewable energy sources are deployed in home, a home energy management system needs to consider both energy consumption and generation simultaneously to minimize the energy cost. In this paper, a smart home energy management model has been presented in which electrical and thermal appliances are jointly scheduled. The proposed method aims at minimizing the electricity cost of a residential customer by scheduling various type of appliances considering the residents consumption behavior, seasonal probability, social random factor, discomfort index and appliances starting probability functions. In this model, the home central controller receives the electricity price information, environmental factors data as well as the resident desired options in order to optimally schedule appliances including electrical and thermal. The scheduling approach is tested on a typical home including variety of home appliances, a small wind turbine, photovoltaic panel, combined heat and power unit, boiler and electrical and thermal storages over a 24-h period. The results show that the scheduling of different appliances can be reached simultaneously by using the proposed formulation. Moreover, simulation results evidenced that the proposed home energy management model exhibits a lower cost and, therefore, is more economical.

  12. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  13. Simulation methods for nuclear production scheduling

    International Nuclear Information System (INIS)

    Miles, W.T.; Markel, L.C.

    1975-01-01

    Recent developments and applications of simulation methods for use in nuclear production scheduling and fuel management are reviewed. The unique characteristics of the nuclear fuel cycle as they relate to the overall optimization of a mixed nuclear-fossil system in both the short-and mid-range time frame are described. Emphasis is placed on the various formulations and approaches to the mid-range planning problem, whose objective is the determination of an optimal (least cost) system operation strategy over a multi-year planning horizon. The decomposition of the mid-range problem into power system simulation, reactor core simulation and nuclear fuel management optimization, and system integration models is discussed. Present utility practices, requirements, and research trends are described. 37 references

  14. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  15. Power system stabilizer control for wind power to enhance power system stability

    OpenAIRE

    Domínguez García, José Luís; Gomis Bellmunt, Oriol; Bianchi, Fernando Daniel; Sumper, Andreas

    2011-01-01

    The paper presents a small signal stability analysis for power systems with wind farm interaction. Power systems have damping oscillation modes that can be excited by disturbance or fault in the grid. The power converters of the wind farms can be used to reduce these oscillations and make the system more stable. These ideas are explored to design a power system stabilized (PSS) for a network with conventional generators and a wind farm in order to increase the damping of the oscillation...

  16. Scheduling language and algorithm development study. Volume 1, phase 2: Design considerations for a scheduling and resource allocation system

    Science.gov (United States)

    Morrell, R. A.; Odoherty, R. J.; Ramsey, H. R.; Reynolds, C. C.; Willoughby, J. K.; Working, R. D.

    1975-01-01

    Data and analyses related to a variety of algorithms for solving typical large-scale scheduling and resource allocation problems are presented. The capabilities and deficiencies of various alternative problem solving strategies are discussed from the viewpoint of computer system design.

  17. Hybrid neuro-fuzzy system for power generation control with environmental constraints

    International Nuclear Information System (INIS)

    Chaturvedi, Krishna Teerth; Pandit, Manjaree; Srivastava, Laxmi

    2008-01-01

    The real time controls at the central energy management centre in a power system, continuously track the load changes and endeavor to match the total power demand with total generation in such a manner that the operating cost is least. However due to the strict government regulations on environmental protection, operation at minimum cost is no longer the only criterion for dispatching electrical power. The idea behind the environmentally constrained combined economic dispatch formulation is to estimate the optimal generation allocation to generating units in such a manner that fuel cost and harmful emission levels are both simultaneously minimized for a given load demand. Conventional optimization techniques are cumbersome for such complex optimization tasks and are not suitable for on-line use due to increased computational burden. This paper proposes a neuro-fuzzy power dispatch method where the uncertainty involved with power demand is modeled as a fuzzy variable. Then Levenberg-Marquardt neural network (LMNN) is used to evaluate the optimal generation schedules. This model trains almost hundred times faster that the popular BP neural network. The proposed method has been tested on two test systems and found to be suitable for on-line combined environmental economic dispatch

  18. Schedulability Analysis and Optimization for the Synthesis of Multi-Cluster Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2003-01-01

    We present an approach to schedulability analysis for the synthesis of multi-cluster distributed embedded systems consisting of time-triggered and event-triggered clusters, interconnected via gateways. We have also proposed a buffer size and worst case queuing delay analysis for the gateways......, responsible for routing inter-cluster traffic. Optimization heuristics for the priority assignment and synthesis of bus access parameters aimed at producing a schedulable system with minimal buffer needs have been proposed. Extensive experiments and a real-life example show the efficiency of our approaches....

  19. Schedulability Analysis and Optimization for the Synthesis of Multi-Cluster Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2003-01-01

    An approach to schedulability analysis for the synthesis of multi-cluster distributed embedded systems consisting of time-triggered and event-triggered clusters, interconnected via gateways, is presented. A buffer size and worst case queuing delay analysis for the gateways, responsible for routing...... inter-cluster traffic, is also proposed. Optimisation heuristics for the priority assignment and synthesis of bus access parameters aimed at producing a schedulable system with minimal buffer needs have been proposed. Extensive experiments and a real-life example show the efficiency of the approaches....

  20. Threshold Based Opportunistic Scheduling of Secondary Users in Underlay Cognitive Radio Networks

    KAUST Repository

    Song, Yao

    2011-12-01

    In underlay cognitive radio networks, secondary users can share the spectrum with primary users as long as the interference caused by the secondary users to primary users is below a certain predetermined threshold. It is reasonable to assume that there is always a large pool of secondary users trying to access the channel, which can be occupied by only one secondary user at a given time. As a result, a multi-user scheduling problem arises among the secondary users. In this thesis, by manipulating basic schemes based on selective multi-user diversity, normalized thresholding, transmission power control, and opportunistic round robin, we propose and analyze eight scheduling schemes of secondary users in an underlay cognitive radio set-up. The system performance of these schemes is quantified by using various performance metrics such as the average system capacity, normalized average feedback load, scheduling outage probability, and system fairness of access. In our proposed schemes, the best user out of all the secondary users in the system is picked to transmit at each given time slot in order to maximize the average system capacity. Two thresholds are used in the two rounds of the selection process to determine the best user. The first threshold is raised by the power constraint from the primary user. The second threshold, which can be adjusted by us, is introduced to reduce the feedback load. The overall system performance is therefore dependent on the choice of these two thresholds and the number of users in the system given the channel conditions for all the users. In this thesis, by deriving analytical formulas and presenting numerical examples, we try to provide insights of the relationship between the performance metrics and the involved parameters including two selection thresholds and the number of active users in the system, in an effort to maximize the average system capacity as well as satisfy the requirements of scheduling outage probability and

  1. Prospects of the use of nanofluids as working fluids for organic Rankine cycle power systems

    DEFF Research Database (Denmark)

    Mondejar, Maria E.; Andreasen, Jesper G.; Regidor, Maria

    2017-01-01

    The search of novel working fluids for organic Rankine cycle power systems is driven by the recent regulations imposing additional phase-out schedules for substances with adverse environmental characteristics. Recently, nanofluids (i.e. colloidal suspensions of nanoparticles in fluids) have been...... suggested as potential working fluids for organic Rankine cycle power systems due to their enhanced thermal properties, potentially giving advantages with respect to the design of the components and the cycle performance. Nevertheless, a number of challenges concerning the use of nanofluids must...... the prospects of using nanofluids as working fluids for organic Rankine cycle power systems. As a preliminary study, nanofluids consisting of a homogenous and stable mixture of different nanoparticles types and a selected organic fluid are simulated on a case study organic Rankine cycle unit for waste heat...

  2. Locality-Aware Task Scheduling and Data Distribution for OpenMP Programs on NUMA Systems and Manycore Processors

    Directory of Open Access Journals (Sweden)

    Ananya Muddukrishna

    2015-01-01

    Full Text Available Performance degradation due to nonuniform data access latencies has worsened on NUMA systems and can now be felt on-chip in manycore processors. Distributing data across NUMA nodes and manycore processor caches is necessary to reduce the impact of nonuniform latencies. However, techniques for distributing data are error-prone and fragile and require low-level architectural knowledge. Existing task scheduling policies favor quick load-balancing at the expense of locality and ignore NUMA node/manycore cache access latencies while scheduling. Locality-aware scheduling, in conjunction with or as a replacement for existing scheduling, is necessary to minimize NUMA effects and sustain performance. We present a data distribution and locality-aware scheduling technique for task-based OpenMP programs executing on NUMA systems and manycore processors. Our technique relieves the programmer from thinking of NUMA system/manycore processor architecture details by delegating data distribution to the runtime system and uses task data dependence information to guide the scheduling of OpenMP tasks to reduce data stall times. We demonstrate our technique on a four-socket AMD Opteron machine with eight NUMA nodes and on the TILEPro64 processor and identify that data distribution and locality-aware task scheduling improve performance up to 69% for scientific benchmarks compared to default policies and yet provide an architecture-oblivious approach for programmers.

  3. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  4. Optimal Sensor Networks Scheduling in Identification of Distributed Parameter Systems

    CERN Document Server

    Patan, Maciej

    2012-01-01

    Sensor networks have recently come into prominence because they hold the potential to revolutionize a wide spectrum of both civilian and military applications. An ingenious characteristic of sensor networks is the distributed nature of data acquisition. Therefore they seem to be ideally prepared for the task of monitoring processes with spatio-temporal dynamics which constitute one of most general and important classes of systems in modelling of the real-world phenomena. It is clear that careful deployment and activation of sensor nodes are critical for collecting the most valuable information from the observed environment. Optimal Sensor Network Scheduling in Identification of Distributed Parameter Systems discusses the characteristic features of the sensor scheduling problem, analyzes classical and recent approaches, and proposes a wide range of original solutions, especially dedicated for networks with mobile and scanning nodes. Both researchers and practitioners will find the case studies, the proposed al...

  5. Multi-objective group scheduling with learning effect in the cellular manufacturing system

    Directory of Open Access Journals (Sweden)

    Mohammad Taghi Taghavi-fard

    2011-01-01

    Full Text Available Group scheduling problem in cellular manufacturing systems consists of two major steps. Sequence of parts in each part-family and the sequence of part-family to enter the cell to be processed. This paper presents a new method for group scheduling problems in flow shop systems where it minimizes makespan (Cmax and total tardiness. In this paper, a position-based learning model in cellular manufacturing system is utilized where processing time for each part-family depends on the entrance sequence of that part. The problem of group scheduling is modeled by minimizing two objectives of position-based learning effect as well as the assumption of setup time depending on the sequence of parts-family. Since the proposed problem is NP-hard, two meta heuristic algorithms are presented based on genetic algorithm, namely: Non-dominated sorting genetic algorithm (NSGA-II and non-dominated rank genetic algorithm (NRGA. The algorithms are tested using randomly generated problems. The results include a set of Pareto solutions and three different evaluation criteria are used to compare the results. The results indicate that the proposed algorithms are quite efficient to solve the problem in a short computational time.

  6. Analytical Evaluation of the Performance of Proportional Fair Scheduling in OFDMA-Based Wireless Systems

    Directory of Open Access Journals (Sweden)

    Mohamed H. Ahmed

    2012-01-01

    Full Text Available This paper provides an analytical evaluation of the performance of proportional fair (PF scheduling in Orthogonal Frequency-Division Multiple Access (OFDMA wireless systems. OFDMA represents a promising multiple access scheme for transmission over wireless channels, as it combines the orthogonal frequency division multiplexing (OFDM modulation and subcarrier allocation. On the other hand, the PF scheduling is an efficient resource allocation scheme with good fairness characteristics. Consequently, OFDMA with PF scheduling represents an attractive solution to deliver high data rate services to multiple users simultaneously with a high degree of fairness. We investigate a two-dimensional (time slot and frequency subcarrier PF scheduling algorithm for OFDMA systems and evaluate its performance analytically and by simulations. We derive approximate closed-form expressions for the average throughput, throughput fairness index, and packet delay. Computer simulations are used for verification. The analytical results agree well with the results from simulations, which show the good accuracy of the analytical expressions.

  7. Stockholm Power Tech. Power systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The proceedings from this symposium is presented in six volumes: Invited speakers` sessions; Power systems; Power electronics; High-voltage technology; Electrical machines and drives; and Information and control systems. This report covers the power systems volume. Separate abstracts have been prepared for 141 of the 145 papers in this volume

  8. Stockholm Power Tech. Power systems

    International Nuclear Information System (INIS)

    1995-01-01

    The proceedings from this symposium is presented in six volumes: Invited speakers' sessions; Power systems; Power electronics; High-voltage technology; Electrical machines and drives; and Information and control systems. This report covers the power systems volume. Separate abstracts have been prepared for 141 of the 145 papers in this volume

  9. Real-time control systems: feedback, scheduling and robustness

    Science.gov (United States)

    Simon, Daniel; Seuret, Alexandre; Sename, Olivier

    2017-08-01

    The efficient control of real-time distributed systems, where continuous components are governed through digital devices and communication networks, needs a careful examination of the constraints arising from the different involved domains inside co-design approaches. Thanks to the robustness of feedback control, both new control methodologies and slackened real-time scheduling schemes are proposed beyond the frontiers between these traditionally separated fields. A methodology to design robust aperiodic controllers is provided, where the sampling interval is considered as a control variable of the system. Promising experimental results are provided to show the feasibility and robustness of the approach.

  10. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  11. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  12. Providing frequency regulation reserve services using demand response scheduling

    International Nuclear Information System (INIS)

    Motalleb, Mahdi; Thornton, Matsu; Reihani, Ehsan; Ghorbani, Reza

    2016-01-01

    Highlights: • Proposing a market model for contingency reserve services using demand response. • Considering transient limitations of grid frequency for inverter-based generations. • Price-sensitive scheduling of residential batteries and water heaters using dynamic programming. • Calculating the profits of both generation companies and demand response aggregators. - Abstract: During power grid contingencies, frequency regulation is a primary concern. Historically, frequency regulation during contingency events has been the sole responsibility of the power utility. We present a practical method of using distributed demand response scheduling to provide frequency regulation during contingency events. This paper discusses the implementation of a control system model for the use of distributed energy storage systems such as battery banks and electric water heaters as a source of ancillary services. We present an algorithm which handles the optimization of demand response scheduling for normal operation and during contingency events. We use dynamic programming as an optimization tool. A price signal is developed using optimal power flow calculations to determine the locational marginal price of electricity, while sensor data for water usage is also collected. Using these inputs to dynamic programming, the optimal control signals are given as output. We assume a market model in which distributed demand response resources are sold as a commodity on the open market and profits from demand response aggregators as brokers of distributed demand response resources can be calculated. In considering control decisions for regulation of transient changes in frequency, we focus on IEEE standard 1547 in order to prevent the safety shut-off of inverter-based generation and further exacerbation of frequency droop. This method is applied to IEEE case 118 as a demonstration of the method in practice.

  13. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  14. Optimal scheduling of biocide dosing for seawater-cooled power and desalination plants

    KAUST Repository

    Mahfouz, Abdullah Bin; Atilhan, Selma; Batchelor, Bill; Linke, Patrick; Abdel-Wahab, Ahmed; El-Halwagi, Mahmoud M.

    2011-01-01

    Thermal desalination systems are typically integrated with power plants to exploit the excess heat resulting from the power-generation units. Using seawater in cooling the power plant and the desalination system is a common practice in many parts

  15. Artificial neural network application for space station power system fault diagnosis

    Science.gov (United States)

    Momoh, James A.; Oliver, Walter E.; Dias, Lakshman G.

    1995-01-01

    This study presents a methodology for fault diagnosis using a Two-Stage Artificial Neural Network Clustering Algorithm. Previously, SPICE models of a 5-bus DC power distribution system with assumed constant output power during contingencies from the DDCU were used to evaluate the ANN's fault diagnosis capabilities. This on-going study uses EMTP models of the components (distribution lines, SPDU, TPDU, loads) and power sources (DDCU) of Space Station Alpha's electrical Power Distribution System as a basis for the ANN fault diagnostic tool. The results from the two studies are contrasted. In the event of a major fault, ground controllers need the ability to identify the type of fault, isolate the fault to the orbital replaceable unit level and provide the necessary information for the power management expert system to optimally determine a degraded-mode load schedule. To accomplish these goals, the electrical power distribution system's architecture can be subdivided into three major classes: DC-DC converter to loads, DC Switching Unit (DCSU) to Main bus Switching Unit (MBSU), and Power Sources to DCSU. Each class which has its own electrical characteristics and operations, requires a unique fault analysis philosophy. This study identifies these philosophies as Riddles 1, 2 and 3 respectively. The results of the on-going study addresses Riddle-1. It is concluded in this study that the combination of the EMTP models of the DDCU, distribution cables and electrical loads yields a more accurate model of the behavior and in addition yielded more accurate fault diagnosis using ANN versus the results obtained with the SPICE models.

  16. Reliability analysis of an LCL tuned track segmented bi-directional inductive power transfer system

    DEFF Research Database (Denmark)

    Asif Iqbal, S. M.; Madawala, U. K.; Thrimawithana, D. J.

    2013-01-01

    Bi-directional Inductive Power Transfer (BDIPT) technique is suitable for renewable energy based applications such as electric vehicles (EVs), for the implementation of vehicle-to-grid (V2G) systems. Recently, more efforts have been made by researchers to improve both efficiency and reliability...... of renewable energy systems to further enhance their economical sustainability. This paper presents a comparative reliability study between a typical BDIPT system and an individually controlled segmented BDIPT system. Steady state thermal simulation results are provided for different output power levels...... for a 1.5 kW BDIPT system in a MATLAB/Simulink environment. Reliability parameters such as failure rate and mean time between failures (MTBF) are compared between the two systems. A nonlinear programming (NP) model is developed for optimizing charging schedule for a stationery EV. A case study of EV...

  17. [Work schedules in the Hungarian health care system and the sleep quality of nurses].

    Science.gov (United States)

    Fusz, Katalin; Pakai, Annamária; Kívés, Zsuzsanna; Szunomár, Szilvia; Regős, Annamária; Oláh, András

    2016-03-06

    One way of ensuring the continuity of health care is the shift work, which is burdensome and it can lead to sleep disturbances. The aim of the study was to measure the typical Hungarian nursing shift systems in hospitals, to analyse the causes of irregular work schedules, and to compare the sleep quality of nurses in different work schedules. 236 head nurses filled out the national online survey, and 217 nurses in clinics of the University of Pécs filled the Hungarian version of Bergen Shift Work Sleep Questionnaire. The head nurses provided data of 8697 nurses's schedules. 51.89% of nurses work in flexible shift system. 1944 employees work in regular shift system, most of them in the following order: 12-hour day shift and 12-hour night shift, followed by a one- or two-day rest. Where there is no system of shifts, the most frequent causes are the needs of nurses and the nurse shortage. Nurses who are working in irregular shift system had worse sleep quality than nurses who are working in flexible and regular shift system (p = 0.044). It would be helpful if the least burdensome shift system could be established.

  18. A Bilevel Scheduling Approach for Modeling Energy Transaction of Virtual Power Plants in Distribution Networks

    Directory of Open Access Journals (Sweden)

    F. Nazari

    2017-03-01

    Full Text Available By increasing the use of distributed generation (DG in the distribution network operation, an entity called virtual power plant (VPP has been introduced to control, dispatch and aggregate the generation of DGs, enabling them to participate either in the electricity market or the distribution network operation. The participation of VPPs in the electricity market has made challenges to fairly allocate payments and benefits between VPPs and distribution network operator (DNO. This paper presents a bilevel scheduling approach to model the energy transaction between VPPs and DNO.  The upper level corresponds to the decision making of VPPs which bid their long- term contract prices so that their own profits are maximized and the lower level represents the DNO decision making to supply electricity demand of the network by minimizing its overall cost. The proposed bilevel scheduling approach is transformed to a single level optimizing problem using its Karush-Kuhn-Tucker (KKT optimality conditions. Several scenarios are applied to scrutinize the effectiveness and usefulness of the proposed model. 

  19. The contract of design of an atomic reactor system in Yonggwang - 5, 6 nuclear power plant

    International Nuclear Information System (INIS)

    1995-05-01

    This is a contract of design of an atomic reactor system in Yonggwang 5, 6 nuclear power plant. It has the general contract condition. In the appendix, it indicates the detail regulations between two parties which are the coverage of division on the responsibility, schedule of the delivery, standard of the technology, guarantee, drawing and paper support of the Korea Electric Power Corporation, support of technology drill, test, regulations of code and standard and list of items and prices.

  20. FY 1998 Report on development of large-scale wind power generation systems. Feasibility study on development of new technologies for wind power generation (Study on the development of wind power generation systems for small-scale power grids); 1998 nendo ogata furyoku hatsuden system kaihatsu seika hokokusho. Furyoku hatsuden shingijutsu kaihatsu kanosei chosa (shokibo keito ni okeru furyoku hatsuden system ni kansuru chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This survey includes the characteristics of small-scale power grids, feasibility studies on introduction of wind turbines in these grids, and statuses of application of wind turbines to isolated islands or the like in the advanced countries, in order to promote introduction of wind power generation systems in isolated islands or the like. It is concluded that small-capacity wind power generation systems can be possibly introduced in the intermediate- to large-scale grids in isolated islands, 1,500kW or larger in capacity, in the Tokyo, Kyushu and Okinawa Electric Power Companies' areas. A scheduled steamer ship for isolated islands can carry up to 10 ton track, and introduction of a small-scale wind turbine is more advantageous viewed from the transportation cost. Some foreign countries have the sites which have achieved a high percentage of grid connection of wind power units by stabilizing wind conditions and connecting them to the main high-voltage grids in different manners from those adopted in Japan. For developing wind turbine bodies, most of the foreign countries surveyed are concentrating their efforts on development and manufacture of large-size units, paying little attention on development of small-size wind turbines for isolated islands. For the future prospects, the promising concepts include adoption of wind turbines small in capacity and easy to transport and assemble, and hybrid systems combined with power storage units. (NEDO)

  1. Surgical scheduling categorization system (SSCS): A novel classification system to improve coordination and scheduling of operative cases in a tertiary pediatric medical system.

    Science.gov (United States)

    Gantwerker, Eric A; Bannos, Cassandra; Cunningham, Michael J; Rahbar, Reza

    2017-01-01

    To describe a surgical categorization system to create a universal nomenclature, delineating patient complexity as a first step toward developing a true risk stratification system. Retrospective database review of all otolaryngology surgical procedures performed in a tertiary pediatric hospital system over one academic year (July 2012-June 2013). All otolaryngology surgical procedures were reviewed, encompassing 8478 procedures on 5711 patients. The attending otolaryngologist assigned surgical scheduling category (SSCS) at the time of case booking based on an institution specific guidelines. The guidelines are as follow: Category I was assigned to American Society of Anesthesiologists physical status classification (ASA) I/II patients, designating them appropriate for institution's suburban ambulatory surgery centers; Category II was ASA I/II patients with social or transportation issues; Category III was ASA I/II patients who required case coordination with other medical or surgical departments; Category IV was reserved for patients of any ASA class whom the surgeon designated to be of a higher complexity. 8478 total procedures analyzed with 7198 having complete records. 48% were Category I, 13.6% were Category II, 1.9% were Category III and 36.5% were Category IV. The ASA were 34.7% ASA I, 50% ASA II, 13.39% ASA III, and 1.9% ASA IV. Although the largest proportion of patients were ASA II (50%), 39.6% of all ASA II were Category IV. Category IV was split into 54.2% ASA II and 34% ASA III and shows that peri-operative surgical concerns were not encompassed by the ASA system. This surgical categorization system streamlines surgical scheduling in a tertiary pediatric hospital system, particularly with respect to the designation of cases as ambulatory surgery center or main operating room appropriate. The case mix complexity is also readily apparent, enhancing recognition of the coordination and attention required for the perioperative management of high complexity

  2. Multiuser switched scheduling systems with per-user threshold and post-user selection

    KAUST Repository

    Nam, Haewoon

    2010-06-01

    A multiuser switched diversity scheduling scheme with per-user feedback threshold is proposed in this paper. Unlike the conventional multiuser switched diversity scheduling scheme where a single threshold is used by all the users in order to determine whether to transmit a feedback, the proposed scheme deploys per-user threshold, where each user uses a potentially different threshold than other users thresholds. This paper first provides a generic analytical framework for the optimal feedback thresholds in a closed form. Then we investigates the impact of user sequence strategies and post selection strategies on the performance of the multiuser switched scheduling scheme with per-user threshold. Numerical and simulation results show that the proposed scheme provides a higher system capacity compared to the conventional scheme. © 2010 IEEE.

  3. Multiuser switched scheduling systems with per-user threshold and post-user selection

    KAUST Repository

    Nam, Haewoon; Alouini, Mohamed-Slim

    2010-01-01

    A multiuser switched diversity scheduling scheme with per-user feedback threshold is proposed in this paper. Unlike the conventional multiuser switched diversity scheduling scheme where a single threshold is used by all the users in order to determine whether to transmit a feedback, the proposed scheme deploys per-user threshold, where each user uses a potentially different threshold than other users thresholds. This paper first provides a generic analytical framework for the optimal feedback thresholds in a closed form. Then we investigates the impact of user sequence strategies and post selection strategies on the performance of the multiuser switched scheduling scheme with per-user threshold. Numerical and simulation results show that the proposed scheme provides a higher system capacity compared to the conventional scheme. © 2010 IEEE.

  4. Power profiling of Cholesky and QR factorizations on distributed memory systems

    KAUST Repository

    Bosilca, George

    2012-08-30

    This paper presents the power profile of two high performance dense linear algebra libraries on distributed memory systems, ScaLAPACK and DPLASMA. From the algorithmic perspective, their methodologies are opposite. The former is based on block algorithms and relies on multithreaded BLAS and a two-dimensional block cyclic data distribution to achieve high parallel performance. The latter is based on tile algorithms running on top of a tile data layout and uses fine-grained task parallelism combined with a dynamic distributed scheduler (DAGuE) to leverage distributed memory systems. We present performance results (Gflop/s) as well as the power profile (Watts) of two common dense factorizations needed to solve linear systems of equations, namely Cholesky and QR. The reported numbers show that DPLASMA surpasses ScaLAPACK not only in terms of performance (up to 2X speedup) but also in terms of energy efficiency (up to 62 %). © 2012 Springer-Verlag (outside the USA).

  5. Sharing Data for Production Scheduling Using the ISA-95 Standard

    Energy Technology Data Exchange (ETDEWEB)

    Harjunkoski, Iiro, E-mail: iiro.harjunkoski@de.abb.com; Bauer, Reinhard [ABB Corporate Research, Industrial Software and Applications, Ladenburg (Germany)

    2014-10-21

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  6. Sharing Data for Production Scheduling Using the ISA-95 Standard

    International Nuclear Information System (INIS)

    Harjunkoski, Iiro; Bauer, Reinhard

    2014-01-01

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  7. Sharing data for production scheduling using the ISA-95 standard

    Directory of Open Access Journals (Sweden)

    Iiro eHarjunkoski

    2014-10-01

    Full Text Available In the development and deployment of production scheduling solutions one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment and other resources are necessary for producing a realistic short-term production plan. Currently, a widely-accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data-exchange for scheduling solutions.

  8. Fractional Programming for Communication Systems—Part II: Uplink Scheduling via Matching

    Science.gov (United States)

    Shen, Kaiming; Yu, Wei

    2018-05-01

    This two-part paper develops novel methodologies for using fractional programming (FP) techniques to design and optimize communication systems. Part I of this paper proposes a new quadratic transform for FP and treats its application for continuous optimization problems. In this Part II of the paper, we study discrete problems, such as those involving user scheduling, which are considerably more difficult to solve. Unlike the continuous problems, discrete or mixed discrete-continuous problems normally cannot be recast as convex problems. In contrast to the common heuristic of relaxing the discrete variables, this work reformulates the original problem in an FP form amenable to distributed combinatorial optimization. The paper illustrates this methodology by tackling the important and challenging problem of uplink coordinated multi-cell user scheduling in wireless cellular systems. Uplink scheduling is more challenging than downlink scheduling, because uplink user scheduling decisions significantly affect the interference pattern in nearby cells. Further, the discrete scheduling variable needs to be optimized jointly with continuous variables such as transmit power levels and beamformers. The main idea of the proposed FP approach is to decouple the interaction among the interfering links, thereby permitting a distributed and joint optimization of the discrete and continuous variables with provable convergence. The paper shows that the well-known weighted minimum mean-square-error (WMMSE) algorithm can also be derived from a particular use of FP; but our proposed FP-based method significantly outperforms WMMSE when discrete user scheduling variables are involved, both in term of run-time efficiency and optimizing results.

  9. Joint User Scheduling and MU-MIMO Hybrid Beamforming Algorithm for mmWave FDMA Massive MIMO System

    Directory of Open Access Journals (Sweden)

    Jing Jiang

    2016-01-01

    Full Text Available The large bandwidth and multipath in millimeter wave (mmWave cellular system assure the existence of frequency selective channels; it is necessary that mmWave system remains with frequency division multiple access (FDMA and user scheduling. But for the hybrid beamforming system, the analog beamforming is implemented by the same phase shifts in the entire frequency band, and the wideband phase shifts may not be harmonious with all users scheduled in frequency resources. This paper proposes a joint user scheduling and multiuser hybrid beamforming algorithm for downlink massive multiple input multiple output (MIMO orthogonal frequency division multiple access (OFDMA systems. In the first step of user scheduling, the users with identical optimal beams form an OFDMA user group and multiplex the entire frequency resource. Then base station (BS allocates the frequency resources for each member of OFDMA user group. An OFDMA user group can be regarded as a virtual user; thus it can support arbitrary MU-MIMO user selection and beamforming algorithms. Further, the analog beamforming vectors employ the best beam of each selected MU-MIMO user and the digital beamforming algorithm is solved by weight MMSE to acquire the best performance gain and mitigate the interuser inference. Simulation results show that hybrid beamforming together with user scheduling can greatly improve the performance of mmWave OFDMA massive MU-MIMO system.

  10. Automatic Scheduling and Planning (ASAP) in future ground control systems

    Science.gov (United States)

    Matlin, Sam

    1988-01-01

    This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.

  11. Dynamic I/O Power Management for Hard Real-Time Systems

    Science.gov (United States)

    2005-01-01

    recently emerged as an attractive alternative to inflexible hardware solutions. DPM for hard real - time systems has received relatively little attention...In particular, energy-driven I/O device scheduling for real - time systems has not been considered before. We present the first online DPM algorithm...which we call Low Energy Device Scheduler (LEDES), for hard real - time systems . LEDES takes as inputs a predetermined task schedule and a device-usage

  12. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  13. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  14. Design and Evaluation of the Terminal Area Precision Scheduling and Spacing System

    Science.gov (United States)

    Swenson, Harry N.; Thipphavong, Jane; Sadovsky, Alex; Chen, Liang; Sullivan, Chris; Martin, Lynne

    2011-01-01

    This paper describes the design, development and results from a high fidelity human-in-the-loop simulation of an integrated set of trajectory-based automation tools providing precision scheduling, sequencing and controller merging and spacing functions. These integrated functions are combined into a system called the Terminal Area Precision Scheduling and Spacing (TAPSS) system. It is a strategic and tactical planning tool that provides Traffic Management Coordinators, En Route and Terminal Radar Approach Control air traffic controllers the ability to efficiently optimize the arrival capacity of a demand-impacted airport while simultaneously enabling fuel-efficient descent procedures. The TAPSS system consists of four-dimensional trajectory prediction, arrival runway balancing, aircraft separation constraint-based scheduling, traffic flow visualization and trajectory-based advisories to assist controllers in efficient metering, sequencing and spacing. The TAPSS system was evaluated and compared to today's ATC operation through extensive series of human-in-the-loop simulations for arrival flows into the Los Angeles International Airport. The test conditions included the variation of aircraft demand from a baseline of today's capacity constrained periods through 5%, 10% and 20% increases. Performance data were collected for engineering and human factor analysis and compared with similar operations both with and without the TAPSS system. The engineering data indicate operations with the TAPSS show up to a 10% increase in airport throughput during capacity constrained periods while maintaining fuel-efficient aircraft descent profiles from cruise to landing.

  15. Mid-term load forecasting of power systems by a new prediction method

    International Nuclear Information System (INIS)

    Amjady, Nima; Keynia, Farshid

    2008-01-01

    Mid-term load forecasting (MTLF) becomes an essential tool for today power systems, mainly in those countries whose power systems operate in a deregulated environment. Among different kinds of MTLF, this paper focuses on the prediction of daily peak load for one month ahead. This kind of load forecast has many applications like maintenance scheduling, mid-term hydro thermal coordination, adequacy assessment, management of limited energy units, negotiation of forward contracts, and development of cost efficient fuel purchasing strategies. However, daily peak load is a nonlinear, volatile, and nonstationary signal. Besides, lack of sufficient data usually further complicates this problem. The paper proposes a new methodology to solve it, composed of an efficient data model, preforecast mechanism and combination of neural network and evolutionary algorithm as the hybrid forecast technique. The proposed methodology is examined on the EUropean Network on Intelligent TEchnologies (EUNITE) test data and Iran's power system. We will also compare our strategy with the other MTLF methods revealing its capability to solve this load forecast problem

  16. Improved Low Power FPGA Binding of Datapaths from Data Flow Graphs with NSGA II -based Schedule Selection

    Directory of Open Access Journals (Sweden)

    BHUVANESWARI, M. C.

    2013-11-01

    Full Text Available FPGAs are increasingly being used to implement data path intensive algorithms for signal processing and image processing applications. In High Level Synthesis of Data Flow Graphs targeted at FPGAs, the effect of interconnect resources such as multiplexers must be considered since they contribute significantly to the area and switching power. We propose a binding framework for behavioral synthesis of Data Flow Graphs (DFGs onto FPGA targets with power reduction as the main criterion. The technique uses a multi-objective GA, NSGA II for design space exploration to identify schedules that have the potential to yield low-power bindings from a population of non-dominated solutions. A greedy constructive binding technique reported in the literature is adapted for interconnect minimization. The binding is further subjected to a perturbation process by altering the register and multiplexer assignments. Results obtained on standard DFG benchmarks indicate that our technique yields better power aware bindings than the constructive binding approach with little or no area overhead.

  17. A novel downlink scheduling strategy for traffic communication system based on TD-LTE technology.

    Science.gov (United States)

    Chen, Ting; Zhao, Xiangmo; Gao, Tao; Zhang, Licheng

    2016-01-01

    There are many existing classical scheduling algorithms which can obtain better system throughput and user equality, however, they are not designed for traffic transportation environment, which cannot consider whether the transmission performance of various information flows could meet comprehensive requirements of traffic safety and delay tolerance. This paper proposes a novel downlink scheduling strategy for traffic communication system based on TD-LTE technology, which can perform two classification mappings for various information flows in the eNodeB: firstly, associate every information flow packet with traffic safety importance weight according to its relevance to the traffic safety; secondly, associate every traffic information flow with service type importance weight according to its quality of service (QoS) requirements. Once the connection is established, at every scheduling moment, scheduler would decide the scheduling order of all buffers' head of line packets periodically according to the instant value of scheduling importance weight function, which calculated by the proposed algorithm. From different scenario simulations, it can be verified that the proposed algorithm can provide superior differentiated transmission service and reliable QoS guarantee to information flows with different traffic safety levels and service types, which is more suitable for traffic transportation environment compared with the existing popularity PF algorithm. With the limited wireless resource, information flow closed related to traffic safety will always obtain priority scheduling right timely, which can help the passengers' journey more safe. Moreover, the proposed algorithm cannot only obtain good flow throughput and user fairness which are almost equal to those of the PF algorithm without significant differences, but also provide better realtime transmission guarantee to realtime information flow.

  18. Revision of nuclear power plants safety systems' routine testing assigned periodicity during the design extension period

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Kozlov, Yi.L.; Chulkyin, O.O.

    2017-01-01

    When nuclear power plants safety systems thermal equipment operation extending, a necessary requirement shall rely on revising the scheduled equipment tests frequency to optimize those tests schedule taking into account the equipment remained lifespan. On the one hand, there exists a need for tests frequency increase to detect ''hidden'' failures, and on the another, frequent tests cause a premature wear of the equipment. Proposed is an original method for optimizing the frequency of NPPs safety systems thermal engineering equipment testing. Essential in the proposed method is the optimization criterion chosen: index of security system failure probability non-exceedance during the beyond-design operating period as referred to the failure probability expected considering the equipment residual resource during the design operating period. The developed method implementation when applied to NPPs safety systems operated beyond the design service life at nuclear power plants with WWER-1000 series reactors, allowed to establish that the optimal tests frequency makes half the designed one when the equipment service life is extended by five years and three times less that the designed frequency when subject lifespan extended by 10 years.

  19. Electric power systems

    CERN Document Server

    Weedy, B M; Jenkins, N; Ekanayake, J B; Strbac, G

    2012-01-01

    The definitive textbook for Power Systems students, providing a grounding in essential power system theory while also focusing on practical power engineering applications. Electric Power Systems has been an essential book in power systems engineering for over thirty years. Bringing the content firmly up-to-date whilst still retaining the flavour of Weedy's extremely popular original, this Fifth Edition has been revised by experts Nick Jenkins, Janaka Ekanayake and Goran Strbac. This wide-ranging text still covers all of the fundamental power systems subjects but is now e

  20. Developing maintainability for fusion power systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Zahn, H.S.; Mantz, H.C.; Curtis, C.T.; Buchheit, R.J.; Green, W.M.; Zuckerman, D.S.

    1979-11-01

    The overall purpose of the study is to identify design features of fusion power reactors which contribute to the achievement of high levels of maintainability. Previous phases evaluated several commercial tokamak reactor design concepts. This final phase compares the maintainability of a tandem mirror reactor (TMR) commercial conceptual design with the most maintainable tokamak concept selected from earlier work. A series of maintainability design guidelines and desirable TMR design features are defined. The effects of scheduled and unscheduled maintenance for most of the reactor subsystems are defined. The comparison of the TMR and tokamak reactor maintenance costs and availabilities show that both reactors have similar costs for scheduled maintenance at 19.4 and 20.8 million dollars annually and similar scheduled downtime availability impacts, achieving approximate availabilities of 79% at optimized maintenance intervals and cost of electricity.

  1. Developing maintainability for fusion power systems. Final report

    International Nuclear Information System (INIS)

    Zahn, H.S.; Mantz, H.C.; Curtis, C.T.; Buchheit, R.J.; Green, W.M.; Zuckerman, D.S.

    1979-11-01

    The overall purpose of the study is to identify design features of fusion power reactors which contribute to the achievement of high levels of maintainability. Previous phases evaluated several commercial tokamak reactor design concepts. This final phase compares the maintainability of a tandem mirror reactor (TMR) commercial conceptual design with the most maintainable tokamak concept selected from earlier work. A series of maintainability design guidelines and desirable TMR design features are defined. The effects of scheduled and unscheduled maintenance for most of the reactor subsystems are defined. The comparison of the TMR and tokamak reactor maintenance costs and availabilities show that both reactors have similar costs for scheduled maintenance at 19.4 and 20.8 million dollars annually and similar scheduled downtime availability impacts, achieving approximate availabilities of 79% at optimized maintenance intervals and cost of electricity

  2. Modeling and distributed gain scheduling strategy for load frequency control in smart grids with communication topology changes.

    Science.gov (United States)

    Liu, Shichao; Liu, Xiaoping P; El Saddik, Abdulmotaleb

    2014-03-01

    In this paper, we investigate the modeling and distributed control problems for the load frequency control (LFC) in a smart grid. In contrast with existing works, we consider more practical and real scenarios, where the communication topology of the smart grid changes because of either link failures or packet losses. These topology changes are modeled as a time-varying communication topology matrix. By using this matrix, a new closed-loop power system model is proposed to integrate the communication topology changes into the dynamics of a physical power system. The globally asymptotical stability of this closed-loop power system is analyzed. A distributed gain scheduling LFC strategy is proposed to compensate for the potential degradation of dynamic performance (mean square errors of state vectors) of the power system under communication topology changes. In comparison to conventional centralized control approaches, the proposed method can improve the robustness of the smart grid to the variation of the communication network as well as to reduce computation load. Simulation results show that the proposed distributed gain scheduling approach is capable to improve the robustness of the smart grid to communication topology changes. © 2013 ISA. Published by ISA. All rights reserved.

  3. Planning of the power hydrothermal system operation - alternatives for the modelling and uncertainties treatment; Planejamento da operacao de sistemas hidrotermicos de potencia - alternativas de modelagem e o tratamento das incertezas

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Andre Flavio Soares; Bajay, Sergio Valdir [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]|[Universidade Estadual de Campinas, SP (Brazil). Nucleo Interdisciplinar de Planejamento Energetico (NIPE)]. E-mails: apereira@fem.unicamp.br; bajay@fem.unicamp.br; Barbosa, Paulo Sergio Franco [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil]|[Universidade Estadual de Campinas, SP (Brazil). Nucleo Interdisciplinar de Planejamento Energetico (NIPE)]. E-mail: franco@fec.unicamp.br

    2006-07-01

    The complexity of the operation scheduling of hydrothermal power systems lies, among other factors, in the interconnection between the operation decision in a certain stage and the future consequences of such decision. The operation of a hydrothermal power system comprises from the supervision and real time control of the generation and transport of electricity, to aspects as the modelling of the uncertainties concerning the future stream flows and the optimised management of the hydro power plant reservoirs. This work addresses a general formulation of the operation scheduling problem of hydrothermal power systems; a brief presentation of the various optimization techniques which can be used in its solution; and a discussion about the main alternatives that has been adopted to model the problem and to deal with its main uncertainties. (author)

  4. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  5. The P-3 Scheduling Support System (P-3 S 3³)

    OpenAIRE

    Anderson, William B.

    1988-01-01

    Approved for public release; distribution is unlimited. A P-3 Scheduling Support System (P-3 S³ ) is a Management Information System (MIS) that was designed using structured techniques. Structured analysis was used to determine the functionality and data requirements. Computer Assisted Systems Engineering (CASE) tools were used to document the analysis and design. The system was designed to be implemented in dBase III Plus, a data base management tool developed by A...

  6. A Simple Method for Dynamic Scheduling in a Heterogeneous Computing System

    OpenAIRE

    Žumer, Viljem; Brest, Janez

    2002-01-01

    A simple method for the dynamic scheduling on a heterogeneous computing system is proposed in this paper. It was implemented to minimize the parallel program execution time. The proposed method decomposes the program workload into computationally homogeneous subtasks, which may be of the different size, depending on the current load of each machine in a heterogeneous computing system.

  7. Optimal Operation of Electric Vehicles in Competitive Electricity Markets and Its Impact on Distribution Power Systems

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2011-01-01

    represent the future of electricity markets in some ways, is chosen as the studied power system in this paper. The impact of the optimal operation strategy for electric vehicles together with the optimal load response to spot market price on the distribution power system with high wind power penetrations...... are also discussed in the paper. Simulation results show that the proposed optimal operation strategy is an effective measure to achieve minimum energy costs of the PEV. The optimal operation strategy of the PEV and the optimal load response may have significant effects on the distribution power system......Since the hourly spot market price is available one day ahead in Denmark, the electricity price could be transferred to the consumers and they may make some optimal charge and discharge schedules for their electric vehicles in order to minimize their energy costs. This paper presents an optimal...

  8. Sort-Mid tasks scheduling algorithm in grid computing

    Directory of Open Access Journals (Sweden)

    Naglaa M. Reda

    2015-11-01

    Full Text Available Scheduling tasks on heterogeneous resources distributed over a grid computing system is an NP-complete problem. The main aim for several researchers is to develop variant scheduling algorithms for achieving optimality, and they have shown a good performance for tasks scheduling regarding resources selection. However, using of the full power of resources is still a challenge. In this paper, a new heuristic algorithm called Sort-Mid is proposed. It aims to maximizing the utilization and minimizing the makespan. The new strategy of Sort-Mid algorithm is to find appropriate resources. The base step is to get the average value via sorting list of completion time of each task. Then, the maximum average is obtained. Finally, the task has the maximum average is allocated to the machine that has the minimum completion time. The allocated task is deleted and then, these steps are repeated until all tasks are allocated. Experimental tests show that the proposed algorithm outperforms almost other algorithms in terms of resources utilization and makespan.

  9. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  10. Research on a scheduling mechanism in a complex system based on TOC

    International Nuclear Information System (INIS)

    Wen, Zhang; Ya-Ming, Zhang; Jinbo, Chen; Kaijun, Leng

    2016-01-01

    Under the condition where there is no seasonal demand fluctuation, short life cycle product supply chain should confront the market environment such as the decreasing of product value, the launch of substitutes and the appearance of competitors’ similar products, and the supply chain will become a very complex system. In this paper, the authors consider a TOC-based scheduling mechanism in this complex supply chain system. under the constant total production cost, it is more important to improve the availability of the wanted product in order to enhance the overall supply chain competitiveness so to obtain more effective output(profit rate) for the supply chain in a long period. Especially we try to apply the SDBR concept into a schedule mechanism in a particular supply chain system, and use numerical analysis to test the efficiency of the proposed method.

  11. Simulating an Isochronal Scheduled Inspection System for the P-3 Orion

    National Research Council Canada - National Science Library

    Jones, Jeffrey

    1998-01-01

    ...) for the United States Navy's P-3 Orion. Implementation of ISIS, which is based solely upon calendar time, has been proposed to replace the present system of scheduled inspections that are based upon both calendar time and flight hours...

  12. A Heuristic Task Scheduling Algorithm for Heterogeneous Virtual Clusters

    Directory of Open Access Journals (Sweden)

    Weiwei Lin

    2016-01-01

    Full Text Available Cloud computing provides on-demand computing and storage services with high performance and high scalability. However, the rising energy consumption of cloud data centers has become a prominent problem. In this paper, we first introduce an energy-aware framework for task scheduling in virtual clusters. The framework consists of a task resource requirements prediction module, an energy estimate module, and a scheduler with a task buffer. Secondly, based on this framework, we propose a virtual machine power efficiency-aware greedy scheduling algorithm (VPEGS. As a heuristic algorithm, VPEGS estimates task energy by considering factors including task resource demands, VM power efficiency, and server workload before scheduling tasks in a greedy manner. We simulated a heterogeneous VM cluster and conducted experiment to evaluate the effectiveness of VPEGS. Simulation results show that VPEGS effectively reduced total energy consumption by more than 20% without producing large scheduling overheads. With the similar heuristic ideology, it outperformed Min-Min and RASA with respect to energy saving by about 29% and 28%, respectively.

  13. A Chaotic Particle Swarm Optimization-Based Heuristic for Market-Oriented Task-Level Scheduling in Cloud Workflow Systems.

    Science.gov (United States)

    Li, Xuejun; Xu, Jia; Yang, Yun

    2015-01-01

    Cloud workflow system is a kind of platform service based on cloud computing. It facilitates the automation of workflow applications. Between cloud workflow system and its counterparts, market-oriented business model is one of the most prominent factors. The optimization of task-level scheduling in cloud workflow system is a hot topic. As the scheduling is a NP problem, Ant Colony Optimization (ACO) and Particle Swarm Optimization (PSO) have been proposed to optimize the cost. However, they have the characteristic of premature convergence in optimization process and therefore cannot effectively reduce the cost. To solve these problems, Chaotic Particle Swarm Optimization (CPSO) algorithm with chaotic sequence and adaptive inertia weight factor is applied to present the task-level scheduling. Chaotic sequence with high randomness improves the diversity of solutions, and its regularity assures a good global convergence. Adaptive inertia weight factor depends on the estimate value of cost. It makes the scheduling avoid premature convergence by properly balancing between global and local exploration. The experimental simulation shows that the cost obtained by our scheduling is always lower than the other two representative counterparts.

  14. Extending an open-source real-time operating system with hierarchical scheduling

    NARCIS (Netherlands)

    Holenderski, M.J.; Cools, W.A.; Bril, R.J.; Lukkien, J.J.

    2010-01-01

    Hierarchical scheduling frameworks (HSFs) have been devised to support the integration of independently developed and analyzed subsystems. This paper presents an efficient, modular and extendible design for enhancing a real-time operating system with periodic tasks, two-level fixed-priority HSF

  15. Scheduling and Voltage Scaling for Energy/Reliability Trade-offs in Fault-Tolerant Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Poulsen, Kåre Harbo; Izosimov, Viacheslav

    2007-01-01

    -execution and dynamic voltage scaling-based low-power techniques are competing for the slack in the schedules. Our approach decides the voltage levels and start times of processes and the transmission times of messages, such that the transient faults are tolerated, the timing constraints of the application...

  16. Exploring a QoS Driven Scheduling Approach for Peer-to-Peer Live Streaming Systems with Network Coding

    Science.gov (United States)

    Cui, Laizhong; Lu, Nan; Chen, Fu

    2014-01-01

    Most large-scale peer-to-peer (P2P) live streaming systems use mesh to organize peers and leverage pull scheduling to transmit packets for providing robustness in dynamic environment. The pull scheduling brings large packet delay. Network coding makes the push scheduling feasible in mesh P2P live streaming and improves the efficiency. However, it may also introduce some extra delays and coding computational overhead. To improve the packet delay, streaming quality, and coding overhead, in this paper are as follows. we propose a QoS driven push scheduling approach. The main contributions of this paper are: (i) We introduce a new network coding method to increase the content diversity and reduce the complexity of scheduling; (ii) we formulate the push scheduling as an optimization problem and transform it to a min-cost flow problem for solving it in polynomial time; (iii) we propose a push scheduling algorithm to reduce the coding overhead and do extensive experiments to validate the effectiveness of our approach. Compared with previous approaches, the simulation results demonstrate that packet delay, continuity index, and coding ratio of our system can be significantly improved, especially in dynamic environments. PMID:25114968

  17. PowerFactory applications for power system analysis

    CERN Document Server

    Gonzalez-Longatt, Francisco

    2014-01-01

    This book presents a comprehensive set of guidelines and applications of DIgSILENT PowerFactory, an advanced power system simulation software package, for different types of power systems studies. Written by specialists in the field, it combines expertise and years of experience in the use of DIgSILENT PowerFactory with a deep understanding of power systems analysis. These complementary approaches therefore provide a fresh perspective on how to model, simulate and analyse power systems. It presents methodological approaches for modelling of system components, including both classical and non-

  18. Investigating the Effect of Voltage-Switching on Low-Energy Task Scheduling in Hard Real-Time Systems

    Science.gov (United States)

    2005-01-01

    We investigate the effect of voltage-switching on task execution times and energy consumption for dual-speed hard real - time systems , and present a...scheduling algorithm and apply it to two real-life task sets. Our results show that energy can be conserved in embedded real - time systems using energy...aware task scheduling. We also show that switching times have a significant effect on the energy consumed in hard real - time systems .

  19. Power system relaying

    CERN Document Server

    Horowitz, Stanley H; Niemira, James K

    2013-01-01

    The previous three editions of Power System Relaying offer comprehensive and accessible coverage of the theory and fundamentals of relaying and have been widely adopted on university and industry courses worldwide. With the third edition, the authors have added new and detailed descriptions of power system phenomena such as stability, system-wide protection concepts and discussion of historic outages. Power System Relaying, 4th Edition continues its role as an outstanding textbook on power system protection for senior and graduate students in the field of electric power engineering and a refer

  20. A FAST AND ELITIST BI-OBJECTIVE EVOLUTIONARY ALGORITHM FOR SCHEDULING INDEPENDENT TASKS ON HETEROGENEOUS SYSTEMS

    Directory of Open Access Journals (Sweden)

    G.Subashini

    2010-07-01

    Full Text Available To meet the increasing computational demands, geographically distributed resources need to be logically coupled to make them work as a unified resource. In analyzing the performance of such distributed heterogeneous computing systems scheduling a set of tasks to the available set of resources for execution is highly important. Task scheduling being an NP-complete problem, use of metaheuristics is more appropriate in obtaining optimal solutions. Schedules thus obtained can be evaluated using several criteria that may conflict with one another which require multi objective problem formulation. This paper investigates the application of an elitist Nondominated Sorting Genetic Algorithm (NSGA-II, to efficiently schedule a set of independent tasks in a heterogeneous distributed computing system. The objectives considered in this paper include minimizing makespan and average flowtime simultaneously. The implementation of NSGA-II algorithm and Weighted-Sum Genetic Algorithm (WSGA has been tested on benchmark instances for distributed heterogeneous systems. As NSGA-II generates a set of Pareto optimal solutions, to verify the effectiveness of NSGA-II over WSGA a fuzzy based membership value assignment method is employed to choose the best compromise solution from the obtained Pareto solution set.