  1. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  2. Fujian electric system analysis and nuclear power planning

    International Nuclear Information System (INIS)

    Lin Jianwen; Fu Qiang; Cheng Ping

    1994-11-01

    The objective of the study is to conduct a long term electric expansion planning and nuclear power planning for Fujian Province. The Wien Automatic System Planning Package (WASP-III) is used to optimize the electric system. Probabilistic Simulation is one of the most favorite techniques for middle and long term generation and production cost planning of electric power system. The load duration curve is obtained by recording the load data of a time interval into a monotone non-increasing sense. Polynomial function is used to describe the load duration curve (LDC), and this LDC is prepared for probabilistic simulation in WASP-III. WASP-III is a dynamic optimizing module in the area of supply modelling. It could find out the economically optimal expansion plan for a power generating system over a period of up to thirty years, with the constraints given by the planners. The optimum is evaluated in terms of minimum discounted total costs. Generating costs, amount of energy not served and reliability of the system are analyzed in the system expansion planning by using the probabilistic simulation method. The following conclusions can be drawn from this study. Hydro electricity is the cheapest one of all available technologies and resources. After the large hydro station is committed at the end of 1995, more base load power plants are needed in the system. Coal-fired power plants with capacity of 600 MWe will be the most competitive power plants in the future of the system. At the end of the studying period, about half of the stalled capacity will be composed of these power plants. Nuclear power plants with capacity of 600 MWe are suitable for the system after the base load increases to a certain level. Oil combustion units will decrease the costs of the system. (12 tabs., 6 figs.)

  3. Long-Term Planning in Restructured Power Systems

    International Nuclear Information System (INIS)

    Botterud, Audun

    2003-01-01

    This thesis describes the development of three decision support models for long-term investment planning in restructured power systems. The model concepts address the changing conditions for the electric power industry, with the introduction of more competitive markets, higher uncertainty and less centralised planning. Under these circumstances there is an emerging need for new planning models, also for analyses of the power system in a long-term perspective. The thesis focuses particularly on how dynamic and stochastic modelling can contribute to the improvement of decision making in a restructured power industry. We argue that the use of such modelling approaches has become more important after the introduction of competitive power markets, due to the participants' increased exposure to price fluctuations and economic risk. Our models can be applied by individual participants in the power system to evaluate investment projects for new power generation capacity. The models can also serve as a decision support tool on a regulatory level, providing analyses of the long-term performance of the power system under different regulations and market designs. In Chapter 1, we give a brief introduction to the ongoing development towards restructuring and liberalisation of the electrical power system. A discussion of the operation and organisation of restructured power systems is also provided. In Chapter 2, we look more specifically at different modelling approaches for expansion planning in electrical power systems. We also discuss how the contributions in this thesis compare to previous work in the field of decision support models for long-term planning in both regulated and competitive power systems. In Chapter 3, we develop a power market simulation model based on system dynamics. The advantages and limitations of using descriptive system dynamics models for long-term planning purposes in this context are also discussed. Chapter 4 is devoted to a novel optimisation

  4. Integration of Renewable Generation in Power System Defence Plans

    DEFF Research Database (Denmark)

    Das, Kaushik

    Increasing levels of penetration of wind power and other renewable generations in European power systems pose challenges to power system security. The power system operators are continuously challenged especially when generations from renewables are high thereby reducing online capacity of conven......Increasing levels of penetration of wind power and other renewable generations in European power systems pose challenges to power system security. The power system operators are continuously challenged especially when generations from renewables are high thereby reducing online capacity......, one of them being the North East area with high share of wind power generation.The aim of this study is to investigate how renewable generations like wind power can contribute to the power system defence plans. This PhD project “Integration of Renewable Generation in Power System Defence Plans...

  5. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    International Nuclear Information System (INIS)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih; Abu-Zarour, Mohammad

    2010-01-01

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems.

  6. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    Energy Technology Data Exchange (ETDEWEB)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih [Al-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328 (Jordan); Abu-Zarour, Mohammad [NEPCO, Department of Generation Planning, P.O. Box 2310, Amman 11194 (Jordan)

    2010-10-15

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems. (author)

  7. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  8. Environmental impacts of power plants and transmission lines in power system planning

    International Nuclear Information System (INIS)

    Miracapillo, C.; Moreschini, G.; Rome Univ. 'La Sapienza'

    1992-01-01

    This paper deals with a criterion to assess the environmental impacts of power plants and transmission lines in power system planning. First, the effects of hydro-plants, thermal plants and transmission lines are reviewed. Then, a number of methods for the evaluation of the environmental impacts of civil and industrial plants are described. A new criterion is proposed to introduce the evaluation of the environmental impact and related costs into methods for power system planning. Finally, the criterion is applied to a simple case

  9. Statistical modeling to support power system planning

    Science.gov (United States)

    Staid, Andrea

    This dissertation focuses on data-analytic approaches that improve our understanding of power system applications to promote better decision-making. It tackles issues of risk analysis, uncertainty management, resource estimation, and the impacts of climate change. Tools of data mining and statistical modeling are used to bring new insight to a variety of complex problems facing today's power system. The overarching goal of this research is to improve the understanding of the power system risk environment for improved operation, investment, and planning decisions. The first chapter introduces some challenges faced in planning for a sustainable power system. Chapter 2 analyzes the driving factors behind the disparity in wind energy investments among states with a goal of determining the impact that state-level policies have on incentivizing wind energy. Findings show that policy differences do not explain the disparities; physical and geographical factors are more important. Chapter 3 extends conventional wind forecasting to a risk-based focus of predicting maximum wind speeds, which are dangerous for offshore operations. Statistical models are presented that issue probabilistic predictions for the highest wind speed expected in a three-hour interval. These models achieve a high degree of accuracy and their use can improve safety and reliability in practice. Chapter 4 examines the challenges of wind power estimation for onshore wind farms. Several methods for wind power resource assessment are compared, and the weaknesses of the Jensen model are demonstrated. For two onshore farms, statistical models outperform other methods, even when very little information is known about the wind farm. Lastly, chapter 5 focuses on the power system more broadly in the context of the risks expected from tropical cyclones in a changing climate. Risks to U.S. power system infrastructure are simulated under different scenarios of tropical cyclone behavior that may result from climate

  10. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  11. Power system restoration: planning and simulation

    Energy Technology Data Exchange (ETDEWEB)

    Hazarika, D. [Assam Engineering Coll., Dept. of Electrical Engineering, Assam (India); Sinha, A.K. [Inidan Inst. of Technology, Dept. of Electrical Engineering, Kharagpur (India)

    2003-03-01

    This paper describes a restoration guidance simulator, which allows power system operator/planner to simulate and plan restoration events in an interactive mode. The simulator provides a list of restoration events according to the priority based on some restoration rules and list of priority loads. It also provides in an interactive mode the list of events, which becomes possible as the system grows during restoration. Further, the selected event is validated through a load flow and other analytical tools to show the consequences of implementing the planned event. (Author)

  12. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  13. Economic market design and planning for electric power systems

    CERN Document Server

    Mili, Lamine

    2010-01-01

    Discover cutting-edge developments in electric power systems. Stemming from cutting-edge research and education activities in the field of electric power systems, this book brings together the knowledge of a panel of experts in economics, the social sciences, and electric power systems. In ten concise and comprehensible chapters, the book provides unprecedented coverage of the operation, control, planning, and design of electric power systems. It also discusses:. A framework for interdisciplinary research and education;. Modeling electricity markets;. Alternative economic criteria and proactiv.

  14. Integrating Photovoltaic Systems in Power System: Power Quality Impacts and Optimal Planning Challenges

    Directory of Open Access Journals (Sweden)

    Aida Fazliana Abdul Kadir

    2014-01-01

    Full Text Available This paper is an overview of some of the main issues in photovoltaic based distributed generation (PVDG. A discussion of the harmonic distortion produced by PVDG units is presented. The maximum permissible penetration level of PVDG in distribution system is also considered. The general procedures of optimal planning for PVDG placement and sizing are also explained in this paper. The result of this review shows that there are different challenges for integrating PVDG in the power systems. One of these challenges is integrated system reliability whereas the amount of power produced by renewable energy source is consistent. Thus, the high penetration of PVDG into grid can decrease the reliability of the power system network. On the other hand, power quality is considered one of the challenges of PVDG whereas the high penetration of PVDGs can lead to more harmonic propagation into the power system network. In addition to that, voltage fluctuation of the integrated PVDG and reverse power flow are two important challenges to this technology. Finally, protection of power system with integrated PVDG is one of the most critical challenges to this technology as the current protection schemes are designed for unidirectional not bidirectional power flow pattern.

  15. Implications of sustainability assessment for electricity system design: The case of the Ontario Power Authority's integrated power system plan

    International Nuclear Information System (INIS)

    Winfield, Mark; Gibson, Robert B.; Markvart, Tanya; Gaudreau, Kyrke; Taylor, Jennifer

    2010-01-01

    This paper explores the results and implications of an illustrative application of a sustainability assessment framework in the design and evaluation of a major integrated power system plan. The paper examines the integrated power system plan developed by the Ontario Power Authority in 2007. The basic framework rests on a generic set of evaluation criteria reflecting basic requirements for progress towards sustainability that was adopted, reinterpreted and applied by the Authority in support of its proposed plan. In response to evident deficiencies in the Authority's work, the authors and colleagues undertook a re-examination using a more fully elaborated sustainability assessment framework, specified for application to power system planning. The results point to a plan and plan components substantially different from those proposed by the Authority. More generally, the results highlight three advantages of applying such a sustainability assessment framework: comprehensive coverage of key requirements for progress towards sustainability while ensuring careful attention to the context and concerns of the sector; emphasis on identifying plan options that avoid major trade-offs among the sustainability criteria and recognition of interactions among the social, ecological, economic and technological realms favouring options that offer multiple, mutually reinforcing and lasting benefits.

  16. A mid-term, market-based power systems planning model

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Dagoumas, Athanasios S.; Georgiadis, Michael C.; Papaioannou, George; Dikaiakos, Christos

    2016-01-01

    Highlights: • A mid-term Energy Planning along with a Unit Commitment model is developed. • The model identifies the optimum interconnection capacity. • Electricity interconnections affect the power mix and the day-ahead spot price. • Renewables’ penetration has impacts on the power reserves and the CO_2 emissions. • Energy policy and fuel pricing can have significant impacts on the power mix. - Abstract: This paper presents a generic Mixed Integer Linear Programming (MILP) model that integrates a Mid-term Energy Planning (MEP) model, which implements generation and transmission system planning at a yearly level, with a Unit Commitment (UC) model, which performs the simulation of the Day-Ahead Electricity Market. The applicability of the proposed model is illustrated in a case study of the Greek interconnected power system. The aim is to evaluate a critical project in the Ten Year Network Development Plan (TYNDP) of the Independent Power Transmission System Operator S.A. (ADMIE), namely the electric interconnection of the Crete Island with the mainland electric system. The proposed modeling framework identifies the implementation (or not) of the interconnection of the Crete Island with the mainland electric system, as well as the optimum interconnection capacity. It also quantifies the effects on the Day-Ahead electricity market and on the energy mix. The paper demonstrates that the model can provide useful insights into the strategic and challenging decisions to be determined by investors and/or policy makers at a national and/or regional level, by providing the optimal energy roadmap and management, as well as clear price signals on critical energy projects under real operating and design constraints.

  17. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  18. Short-Term Planning of Hybrid Power System

    Science.gov (United States)

    Knežević, Goran; Baus, Zoran; Nikolovski, Srete

    2016-07-01

    In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.

  19. Results from the Macedonian power system development planning

    International Nuclear Information System (INIS)

    Volkanovski, A.; Bosevski, T.; Todorovski, M.

    2000-01-01

    In this paper we present the results from the development planning of the Macedonian power system for the period 2001-2020. Taking into account the fact that one can not consider construction of new power generating units on domestic lignite due to its shortage, development of the national power system can be supported by utilisation of hydro potential, natural gas within the capabilities of the existing gas pipeline and nuclear energy. The crucial year in the planning period will be the year when reduction of the lignite utilisation in the existing thermal plants will take place, which will cause construction of new units with significant capacities. We have analysed two possibilities for inclusion od nuclear plant, optimal based on the economical criteria and forced with delay of the on-line year of the nuclear plant starting from the optimal year for its construction (2014 which was obtained from the WASP optimisation procedure) and ending with the year 2021 (one year beyond the study period). (author)

  20. Planning and Resource Management in an Intelligent Automated Power Management System

    Science.gov (United States)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  1. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  2. Computerized planning system for nuclear power plant evaluation

    International Nuclear Information System (INIS)

    Bonczek, R.H.; Holsapple, C.W.; Whinston, A.B.

    1976-01-01

    A computerized system is described for information storage and query processing adapted to complex socio-technological issues. The system is referred to as GPLAN (Generalized Planning System) and can accommodate both qualitative (verbal) and quantitative data. The issue illustrated is the construction of a nuclear power plant, and involves interdisciplinary research and planning. The system's outstanding features are the use of the network variety of data base, the selective retrieval of any configuration of data from a particular network structure, automatic execution of any desired application program from a standard or special library of applications, user interface with a data base and applications by submitting English-like, non-procedural queries, and generality which allows tailoring to specific applications and provides a basis for integration of planning and research activities. The system is general and can be used for a wide variety of socio-technological issues which involve complex data relationships

  3. DYNAMIC PROGRAMMING – EFFICIENT TOOL FOR POWER SYSTEM EXPANSION PLANNING

    Directory of Open Access Journals (Sweden)

    SIMO A.

    2015-03-01

    Full Text Available The paper isfocusing on dynamic programming use for power system expansion planning (EP – transmission network (TNEP and distribution network (DNEP. The EP problem has been approached from the retrospective and prospective point of view. To achieve this goal, the authors are developing two software-tools in Matlab environment. Two techniques have been tackled: particle swarm optimization (PSO and genetic algorithms (GA. The case study refers to Test 25 buses test power system developed within the Power Systems Department.

  4. Planning for a space infrastructure for disposal of nuclear space power systems

    International Nuclear Information System (INIS)

    Angelo, J. Jr.; Albert, T.E.; Lee, J.

    1989-01-01

    The development of safe, reliable, and compact power systems is vital to humanity's exploration, development, and, ultimately, civilization of space. Nuclear power systems appear to present to offer the only practical option of compact high-power systems. From the very beginning of US space nuclear power activities, safety has been a paramount requirement. Assurance of nuclear safety has included prelaunch ground handling operations, launch, and space operations of nuclear power sources, and more recently serious attention has been given to postoperational disposal of spent or errant nuclear reactor systems. The purpose of this paper is to describe the progress of a project to utilize the capabilities of an evolving space infrastructure for planning for disposal of space nuclear systems. Project SIREN (Search, Intercept, Retrieve, Expulsion - Nuclear) is a project that has been initiated to consider post-operational disposal options for nuclear space power systems. The key finding of Project SIREN was that although no system currently exists to affect the disposal of a nuclear space power system, the requisite technologies for such a system either exist or are planned for part of the evolving space infrastructure

  5. Electric-power systems planning and greenhouse-gas emission management under uncertainty

    International Nuclear Information System (INIS)

    Li, Y.P.; Huang, G.H.

    2012-01-01

    Highlight: ►A multistage stochastic integer programming model is developed for planning electric-power systems. ►Uncertain and dynamic information can be incorporated within a multilayer scenario tree. ►This can help minimize system cost under random energy demand and greenhouse gas (GHG) abatement goal. ►Results can support decisions of facility expansion, electricity supply and GHG mitigation. - Abstract: In this study, a multistage interval-stochastic integer programming model is formulated for managing greenhouse gas (GHG) emissions and planning electric-power systems under uncertainty. The developed model can reflect dynamic, interactive, and uncertain characteristics of energy systems. Besides, the model can be used for answering questions related to types, times, demands and mitigations of energy systems planning practices, with the objective of minimizing system cost over a long-time planning horizon. The solutions can help generate electricity-generation schemes and capacity-expansion plans under different GHG-mitigation options and electricity-demand levels. Tradeoffs among system cost, energy security, and emission management can also be tackled. A high system cost will increase renewable energy supply and reduce GHG emission, while a desire for a low cost will run into risks of a high energy deficiency and a high GHG emission.

  6. Power facility plan and power supply plan of Japan in 1988

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, Shoji; Makino, Masao

    1988-06-01

    The power facility plan and the power supply plan for 1988 are described. The demand by non-industrial use will grow at an average of 3.8% for the 1986-97 period due to changes in the life style, construction and extension of buildings and increasing use of OA equipment although the power conservation is promoted. The industrial consumption will increase at only 1.2% a year due to the slowed growth and energy saving. As a result, the total demand will be 778,200 million kWh in 1997 with annual growth of 2.4%. The maximum demand will be 151,210 kW in 1997 with annual growth of 2.9%. The annual load rate will decrease to 56.9%, showing a continuously worsening utilization efficiency of power facilities. The development of 29 power units with total capacity of 2,760 MW is planned in 1988 for a stable power supply with a sufficient margin regarding maximum demand. The plan requires the investment of 3,700 billion yen, including the power transmission systems and substations. The power supply plan in 1988 is aimed at the effective operation of facilities and cost reduction by regional management under proper recognition of local characteristics of each power source, while maintaining a stable power supply with specified margins. (1 fig, 11 tabs)

  7. Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy

    Energy Technology Data Exchange (ETDEWEB)

    Ding, Yi; Kang, Chongqing; Wang, Jianhui; Chen, Yihsu; Hobbs, Benjamin F.

    2015-03-01

    The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.

  8. Energy models for generation planning and midterm operation of hydrothermal power systems

    Energy Technology Data Exchange (ETDEWEB)

    Amthauer, E

    1981-01-01

    The aims of generation planning and midterm operation of a power system are reliable and economical load coverage at any moment. For solving some of the planning tasks, it is advantageous to use energy models, if a large amount of power is installed in hydro-storage plants. Energy models apply the probability of load coverage in a given period as a quantitative measure for a power system's reliability provided the availability of the transmission network is given. Reliability may be influenced by installing new plants (longterm) or by committing the existing plants in a particular fashion. An evaluation of these activities makes it possible to determine decisions which optimize a given object function. In this thesis, energy models for the Swiss hydrothermal power system are derived and tested by simulation. For this utility, energy supply during the emptying period of the storage plants in winter is of special interest. Therefore, the criteria for generation planning are derived by analysing the distribution functions of future energy balances in winter periods. The committment of the existing plants and energy exchange with other utilities in a straight following winter period are planned by means of a sequential decision process. It is shown how strategies for these planning tasks are found with the models. Those model parameters, having the highest influence on reliable and economical load coverage are extracted by means of sensitivity analysis.

  9. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  10. Electric utility system planning studies for OTEC power integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  11. Visions, Scenarios and Action Plans Towards Next Generation Tanzania Power System

    Directory of Open Access Journals (Sweden)

    Alex Kyaruzi

    2012-10-01

    Full Text Available This paper presents strategic visions, scenarios and action plans for enhancing Tanzania Power Systems towards next generation Smart Power Grid. It first introduces the present Tanzanian power grid and the challenges ahead in terms of generation capacity, financial aspect, technical and non-technical losses, revenue loss, high tariff, aging infrastructure, environmental impact and the interconnection with the neighboring countries. Then, the current initiatives undertaken by the Tanzania government in response to the present challenges and the expected roles of smart grid in overcoming these challenges in the future with respect to the scenarios presented are discussed. The developed scenarios along with visions and recommended action plans towards the future Tanzanian power system can be exploited at all governmental levels to achieve public policy goals and help develop business opportunities by motivating domestic and international investments in modernizing the nation’s electric power infrastructure. In return, it should help build the green energy economy.

  12. Optimal Planning and Operation Management of a Ship Electrical Power System with Energy Storage System

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Dragicevic, Tomislav; Meng, Lexuan

    2016-01-01

    Next generation power management at all scales is highly relying on the efficient scheduling and operation of different energy sources to maximize efficiency and utility. The ability to schedule and modulate the energy storage options within energy systems can also lead to more efficient use...... of the generating units. This optimal planning and operation management strategy becomes increasingly important for off-grid systems that operate independently of the main utility, such as microgrids or power systems on marine vessels. This work extends the principles of optimal planning and economic dispatch...... for the proposed plan is derived based on the solution from a mixed-integer nonlinear programming (MINLP) problem. Simulation results showed that including well-sized energy storage options together with optimal operation management of generating units can improve the economic operation of the test system while...

  13. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  14. Dynamic Isotope Power System: technology verification phase, program plan, 1 October 1978

    International Nuclear Information System (INIS)

    1979-01-01

    The technology verification phase program plan of the Dynamic Isotope Power System (DIPS) project is presented. DIPS is a project to develop a 0.5 to 2.0 kW power system for spacecraft using an isotope heat source and a closed-cycle Rankine power-system with an organic working fluid. The technology verification phase's purposes are to increase the system efficiency to over 18%, to demonstrate system reliability, and to provide an estimate for flight test scheduling. Progress toward these goals is reported

  15. Generation expansion planning of the electrical power system in West Java

    International Nuclear Information System (INIS)

    Nengah Sudja.

    1975-01-01

    A thorough study on the generation expansion planning of the electrical power system, covering mathematical and computerized calculations, and financial analysis on the daily load, the load duration, and the assumption of future load, supporting the idea for building nuclear power plants in Indonesia, is presented. (RUW)

  16. Probabilistic tools for planning and operating power systems with distributed energy storage

    DEFF Research Database (Denmark)

    Klöckl, Bernd; Papaefthymiou, George; Pinson, Pierre

    2008-01-01

    Stochastic energy flows are an increasingly important phenomenon in today's power system planning and operation. They are – among other reasons – caused by large amounts of stochastic generation such as wind. The inclusion of energy storage devices, distributed in future systems (distributed energy...... owners are either the grid operators, the generation owners, or the energy traders. For the grid operators being the DES owners, storage operation will have to be integrated into the planning of the system, therefore multivariate nonparametric time series analysis and synthesis methods have to be applied...... to recorded data of stochastic energy resources. Together with suited storage models, the implications of DES on the planning of the system can then be assessed. For the producers or traders being the owners of the DES, the topic to be addressed is the real-time operation of each storage device in the power...

  17. POWER SYSTEM PLANNING USING ANN WITH FUZZY LOGIC AND WAVELET ANALYSIS

    Directory of Open Access Journals (Sweden)

    V. Dharma Dharshin

    2016-10-01

    Full Text Available The electricity load required for the forthcoming years are predetermined by means of power system planning. Accuracy is the crucial factor that must be taken care of in the power system planning. Electricity is generally volatile, that is it changes and hence appropriate estimation must be done without leading to overestimation or underestimation. The aim of the project is to do appropriate power estimation with the help of the economic factors. The 9 input factors used are GDP, industry, imports, CO2 emission, exports, services, manufacturing, population, per capita consumption. The proposed methodology is done by means of Neural Network concept and Wavelet Analysis. Regression Analysis is also performed and the comparisons are done using Fuzzy Logic. The nonlinear model, Artificial Neural Network and the Wavelet Analysis are found to be more accurate and effective.

  18. An integrated model for long-term power generation planning toward future smart electricity systems

    International Nuclear Information System (INIS)

    Zhang, Qi; Mclellan, Benjamin C.; Tezuka, Tetsuo; Ishihara, Keiichi N.

    2013-01-01

    Highlights: • An integrated model for planning future smart electricity systems was developed. • The model consists of an optimization model and an hour-by-hour simulation model. • The model was applied to Tokyo area, Japan in light of the Fukushima Accident. • Paths to best generation mixes of smart electricity systems were obtained. • Detailed hourly operation patterns in smart electricity systems were obtained. - Abstract: In the present study, an integrated planning model was developed to find economically/environmentally optimized paths toward future smart electricity systems with high level penetration of intermittent renewable energy and new controllable electric devices at the supply and demand sides respectively for regional scale. The integrated model is used to (i) plan the best power generation and capacity mixes to meet future electricity demand subject to various constraints using an optimization model; (ii) obtain detailed operation patterns of power plants and new controllable electric devices using an hour-by-hour simulation model based on the obtained optimized power generation mix. As a case study, the model was applied to power generation planning in the Tokyo area, Japan, out to 2030 in light of the Fukushima Accident. The paths toward best generation mixes of smart electricity systems in 2030 based on fossil fuel, hydro power, nuclear and renewable energy were obtained and the feasibility of the integrated model was proven

  19. Implementation of an evolutionary algorithm in planning investment in a power distribution system

    Directory of Open Access Journals (Sweden)

    Carlos Andrés García Montoya

    2011-06-01

    Full Text Available The definition of an investment plan to implement in a distribution power system, is a task that constantly faced by utilities. This work presents a methodology for determining the investment plan for a distribution power system under a shortterm, using as a criterion for evaluating investment projects, associated costs and customers benefit from its implementation. Given the number of projects carried out annually on the system, the definition of an investment plan requires the use of computational tools to evaluate, a set of possibilities, the one that best suits the needs of the present system and better results. That is why in the job, implementing a multi objective evolutionary algorithm SPEA (Strength Pareto Evolutionary Algorithm, which, based on the principles of Pareto optimality, it deliver to the planning expert, the best solutions found in the optimization process. The performance of the algorithm is tested using a set of projects to determine the best among the possible plans. We analyze also the effect of operators on the performance of evolutionary algorithm and results.

  20. Analysis of the security during power system expansion planning

    Directory of Open Access Journals (Sweden)

    Osak Alexey

    2017-01-01

    Full Text Available Increasing the intelligent level of the EPS control systems, caused by the implementation of Smart technologies, changes the structure and the properties of EPS and increases the importance of system reliability analysis. System reliability analysis includes two components – for the balance and for the regime. On the one hand, there is a large number of studies to assess the reliability of the power system, which examines various aspects and methods of solving this problem. On the other hand, in Russia there is no generally accepted methodology with clear criteria that could be used for feasibility studies of various technical solutions taking into consideration system reliability aspects. In practice, the security analysis is limited by the calculations of power flows, static and dynamic stability for a number of forecast periods for the normal and repair circuits considering the most severe disturbances. The existing approach allows defining the requirements and adjusting emergency control systems, but does not allow evaluating and comparing solutions for power grid constructions. The authors propose a new method for power system reliability evaluation, which is suitable for planning development and operation of power systems. The method includes a general description of the algorithm which allows to compare various development scenarios, as well as to assess the reliability level of their implementation. In particular, the method allows to determine where it is needed only the relay protection and emergency control system development, and where it is necessary grid, protection and control development and reconstruction.

  1. Flexible power generation systems and their planning

    International Nuclear Information System (INIS)

    Schwarzenbach, A.; Wunsch, A.K.

    1989-01-01

    By determining their specific annual costs and expressing them in relation to the period of utilization or to the load factor, it is possible to compare the relative merits of different combinbations of power generation systems. This method, with which unsuitable planning variants can be eliminated without having to go through long, intricate calculations and without taking up costly computer time, has the advantage that it points up the origin of the costs and at the same time makes clear how improvement can be achieved by combining base-load, medium-load and peak-load plants. The different types of power plant (hydro-electric, nuclear, steam, gas-turbine, combined cycle, cogeneration and coal gasification) are characterized by their approximate specific capital investment, construction period, efficiency, fuel, duty, and time from cold start to full load. They are compared by plotting their total specific annual costs in SFr/kWa against the load factor. The special benefits which combined cycle plants, with gas turbines, heat-recovery boilers and steam plant, can offer today (not only high fuel utilization and relatively low first-time costs, but also the short time needed for planning and construction) are underlined. 5 refs.; 9 figs.; 3 tabs

  2. Planning of a Quadgeneration power plant for Jammerbugt energy system

    DEFF Research Database (Denmark)

    Rudra, Souman; Hoffmann, Jessica; Rosendahl, Lasse

    2011-01-01

    Quadgeneration is the simultaneous production of power, heat and cooling and different fuels from flexible feedstocks such as biomass, waste, refinery residue etc. In order to accommodate more renewable energy into the energy system, it is extremely necessary to develop new flexible power plants...... of some equipments in the Quadgeneration power plant. This paper presents two models for the investment planning of a Quadgeneration energy system in Jammerbugt municipality, and uses these models for different case studies addressing the system for production of heat, cooling, liquid fuels...... that can quickly increase or decrease the production of electricity. Such plants should be ultra flexible in terms of production and able to run on many different types of fuels, with one of its major outputs being liquid fuels for the transport sector. The aim of this paper is to integrate district...

  3. Problems of heat sources modeling on stage of isolated power systems expansion planning

    International Nuclear Information System (INIS)

    Malenkov, A.V.; Reshetnikova, L.N.; Sergeev, Yu.A.

    1998-01-01

    It is necessary to use computer codes for evaluation of possible applications and role of nuclear district heating plants in the local self-balancing power and heating systems, which are to be located in the remote isolated and hardly accessible regions in the Far North of Russia. Key factors in determining system configurations and its performances are: (1) interdependency of electricity, heat and fuel supply; (2) long distance between energy consumer centres (from several tens up to some hundred kilometers); and (3) difficulty in export and import of the electricity, especially the fuel in and from neighbouring and remote regions. The problem to challenge is to work out an optimum expansion plan of the local electricity and heat supply system. The ENPEP (ENergy and Power Evaluation Program) software package, which was developed by IAEA together with the USA Argonne National Laboratory, was chosen for this purpose. The Chaun-Bilibino power system (CBPS), an isolated power system in far North-East region of Russia, was selected as the first case of the ENPEP study. ENPEP allows a complex approach in the system expansion optimization planning in the time frame of planning period of up to 30 years. The key ENPEP module, ELECTRIC, considers electricity as the only product. The cogeneration part (heat production) must be considered outside the ELECTRIC model and then the results to be transfer ed to ELECTRIC. The ENPEP study on the Chaun-Bilibino isolated power system has shown that the modelling of the heat supply sources in ENPEP is not a trivial problem. It is very important and difficult to correctly represent specific features of cogeneration process at the same time. (author)

  4. An optimization framework for the integrated planning of generation and transmission expansion in interconnected power systems

    International Nuclear Information System (INIS)

    Guerra, Omar J.; Tejada, Diego A.; Reklaitis, Gintaras V.

    2016-01-01

    Highlights: • A novel optimization framework for the design and planning of interconnected power systems is proposed. • The framework integrates generation and transmission capacity expansion planning. • Reserve and emission constraints are included. • Business as usual and CO_2 mitigation policy scenarios are evaluated. • Reconfiguration of existing power generation technologies is the most cost-effective option for CO_2 emissions mitigation. - Abstract: Energy, and particularly electricity, has played and will continue to play a very important role in the development of human society. Electricity, which is the most flexible and manageable energy form, is currently used in a variety of activities and applications. For instance, electricity is used for heating, cooling, lighting, and for operating electronic appliances and electric vehicles. Nowadays, given the rapid development and commercialization of technologies and devices that rely on electricity, electricity demand is increasing faster than overall primary energy supply. Consequently, the design and planning of power systems is becoming a progressively more important issue in order to provide affordable, reliable and sustainable energy in timely fashion, not only in developed countries but particularly in developing economies where electricity demand is increasing even faster. Power systems are networks of electrical devices, such as power plants, transformers, and transmission lines, used to produce, transmit, and supply electricity. The design and planning of such systems require the selection of generation technologies, along with the capacity, location, and timing of generation and transmission capacity expansions to meet electricity demand over a long-term horizon. This manuscript presents a comprehensive optimization framework for the design and planning of interconnected power systems, including the integration of generation and transmission capacity expansion planning. The proposed

  5. Kilowatt isotope power system, Phase II Plan. Volume IV. Teledyne FSCD vs GDS

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-15

    This Volume contains Teledyne's input to the Kilowatt Isotope Power System Phase II Plan. Included is a description of the Flight System Heat Generation System, Flight System Radiator, Thermal Insulation Stability, GDS Heat Generation System and GDS Radiator.

  6. Optimal Capacity Proportion and Distribution Planning of Wind, Photovoltaic and Hydro Power in Bundled Transmission System

    Science.gov (United States)

    Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.

    2017-05-01

    The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.

  7. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  8. It's Indisputable: Five Facts About Planning and Operating Modern Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Bloom, Aaron; Helman, Udi; Holttinen, Hannele; Summers, Kate; Bakke, Jordan; Brinkman, Gregory; Lopez, Anthony

    2017-11-01

    An indisputable fact cannot be rebutted. It is supported by theory and experience. Over the past 25 years, wind and solar generation has undergone dramatic growth, resulting in a variety of experiences that model the integration of wind and solar into the planning and operation of modern electric power systems. In this article, we bring together examples from Europe, North America, and Australia to identify five indisputable facts about planning and operating modern power systems. Taken together, we hope these experiences can help build consensus among the engineering and public policy communities about the current state of wind and solar integration and also facilitate conversations about evolving future challenges.

  9. Power Distribution System Planning Evaluation by a Fuzzy Multi-Criteria Group Decision Support System

    Directory of Open Access Journals (Sweden)

    Tiefeng Zhang

    2010-10-01

    Full Text Available The evaluation of solutions is an important phase in power distribution system planning (PDSP which allows issues such as quality of supply, cost, social service and environmental implications to be considered and usually involves the judgments of a group of experts. The planning problem is thus suitable for the multi-criteria group decision-making (MCGDM method. The evaluation process and evaluation criteria often involve uncertainties incorporated in quantitative analysis with crisp values and qualitative judgments with linguistic terms; therefore, fuzzy sets techniques are applied in this study. This paper proposes a fuzzy multi-criteria group decision-making (FMCGDM method for PDSP evaluation and applies a fuzzy multi-criteria group decision support system (FMCGDSS to support the evaluation task. We introduce a PDSP evaluation model, which has evaluation criteria within three levels, based on the characteristics of a power distribution system. A case-based example is performed on a test distribution network and demonstrates how all the problems in a PDSP evaluation are addressed using FMCGDSS. The results are acceptable to expert evaluators.

  10. Station planning and design incorporating modern power system practice

    CERN Document Server

    Martin, PC

    1991-01-01

    The planning and design of new power stations can involve complex interaction between the many engineering disciplines involved as well as environmental, planning, economical, political and social pressures. This volume aims to provide a logical review of the procedures involved in power station development. The engineering aspects are outlined in detail, with examples, showing the basis of the relationships involved together with ""non-engineering"" factors so that the engineer can draw on the information provided for specific projects. The civil engineering and building of power stations are

  11. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-IV. User's manual

    International Nuclear Information System (INIS)

    2001-01-01

    As a continuation of its efforts to provide methodologies and tools to Member States to carry out comparative assessment and analyse priority environmental issues related to the development of the electric power sector, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package WASP-IV for carrying out power generation expansion planning taking into consideration fuel availability and environmental constraints. This manual constitutes a part of this work and aims to provide users with a guide to use effectively the new version of the model WASP-IV. WASP was originally developed in 1972 by the Tennessee Valley Authority and the Oak Ridge National Laboratory in the USA to meet the IAEA needs to analyse the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. Previous versions of the model were used by Member States in many national and regional studies to analyse the electric power system expansion planning and the role of nuclear energy in particular. Experience gained from its application allowed development of WASP into a very comprehensive planning tool for electric power system expansion analysis. New, improved versions were developed, which took into consideration the needs expressed by the users of the programme in order to address important emerging issues being faced by the electric system planners. In 1979, WASP-IV was released and soon after became an indispensable tool in many Member States for generation expansion planning. The WASP-IV version was continually upgraded and the development of version WASP-III Plus commenced in 1992. By 1995, WASP-III Plus was completed, which followed closely the methodology of the WASP-III but incorporated new features. In order to meet the needs of electricity planners and following the recommendations of the Helsinki symposium, development of a new version of WASP was

  12. Fuel cell power systems for remote applications. Phase 1 final report and business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The goal of the Fuel Cell Power Systems for Remote Applications project is to commercialize a 0.1--5 kW integrated fuel cell power system (FCPS). The project targets high value niche markets, including natural gas and oil pipelines, off-grid homes, yachts, telecommunication stations and recreational vehicles. Phase 1 includes the market research, technical and financial analysis of the fuel cell power system, technical and financial requirements to establish manufacturing capability, the business plan, and teaming arrangements. Phase 1 also includes project planning, scope of work, and budgets for Phases 2--4. The project is a cooperative effort of Teledyne Brown Engineering--Energy Systems, Schatz Energy Research Center, Hydrogen Burner Technology, and the City of Palm Desert. Phases 2 through 4 are designed to utilize the results of Phase 1, to further the commercial potential of the fuel cell power system. Phase 2 focuses on research and development of the reformer and fuel cell and is divided into three related, but potentially separate tasks. Budgets and timelines for Phase 2 can be found in section 4 of this report. Phase 2 includes: Task A--Develop a reformate tolerant fuel cell stack and 5 kW reformer; Task B--Assemble and deliver a fuel cell that operates on pure hydrogen to the University of Alaska or another site in Alaska; Task C--Provide support and training to the University of Alaska in the setting up and operating a fuel cell test lab. The Phase 1 research examined the market for power systems for off-grid homes, yachts, telecommunication stations and recreational vehicles. Also included in this report are summaries of the previously conducted market reports that examined power needs for remote locations along natural gas and oil pipelines. A list of highlights from the research can be found in the executive summary of the business plan.

  13. Reliability program plan for the Kilowatt Isotope Power System (KIPS) technology verification phase

    International Nuclear Information System (INIS)

    1978-01-01

    Ths document is an integral part of the Kilowatt Isotope Power System (KIPS) Program Plan. This document defines the KIPS Reliability Program Plan for the Technology Verification Phase. This document delineates the reliability assurance tasks that are to be accomplished by Sundstrand and its suppliers during the design, fabrication and testing of the KIPS

  14. Expansion planning for electrical generating systems

    International Nuclear Information System (INIS)

    1984-01-01

    The guidebook outlines the general principles of electric power system planning in the context of energy and economic planning in general. It describes the complexities of electric system expansion planning that are due to the time dependence of the problem and the interrelation between the main components of the electric system (generation, transmission and distribution). Load forecasting methods are discussed and the principal models currently used for electric system expansion planning presented. Technical and economic information on power plants is given. Constraints imposed on power system planning by plant characteristics (particularly nuclear power plants) are discussed, as well as factors such as transmission system development, environmental considerations, availability of manpower and financial resources that may affect the proposed plan. A bibliography supplements the references that appear in each chapter, and a comprehensive glossary defines terms used in the guidebook

  15. The long term plan for the integration of nuclear power plants into the Turkish Electrical Power System

    International Nuclear Information System (INIS)

    Kutukcuoglu, A.

    1974-03-01

    The report covers in detail the study of the expansion of the Turkish Electric Power System for the period 1980-1987. Load forecast is done by sectors and regions and inter-regions power balances gave the basis for the high voltage network configurations. Expansion alternatives are defined giving priority to hydroelectric projects, to local resources and nuclear power plants concurrently with conventional plants (lignite and oil). Several reactor strategies are analysed with LWR, HWR, FBR and HTGR power plants. Present worth value method is used for comparison of alternatives and sensitivity analysis is done for those ranked in the first places. Load flow, transient stability and frequency deviation studies of the power system are studied carefully by means of A.C. calculator and digital computer codes in order to see the influence of the introduction of large-sized power plants (600-750MW(e)) and their location in the power system. A 600MW(e) nuclear plant in 1983 and a second one of 750MW(e) in 1987 should, it is found, be commissioned into the system. The economic optimization was done with two computer programmes developed by KFA (Juelich): IACO for fuelling nuclear plant and RESTRAPO for power system with high hydroelectric component. The report is bound in three volumes: Volume I: Summary and Conclusions; Volume II: System Planning; Volume III: Electrical Survey

  16. SVC Planning in Large–scale Power Systems via a Hybrid Optimization Method

    DEFF Research Database (Denmark)

    Yang, Guang ya; Majumder, Rajat; Xu, Zhao

    2009-01-01

    The research on allocation of FACTS devices has attracted quite a lot interests from various aspects. In this paper, a hybrid model is proposed to optimise the number, location as well as the parameter settings of static Var compensator (SVC) deployed in large–scale power systems. The model...... utilises the result of vulnerability assessment for determining the candidate locations. A hybrid optimisation method including two stages is proposed to find out the optimal solution of SVC in large– scale planning problem. In the first stage, a conventional genetic algorithm (GA) is exploited to generate...... a candidate solution pool. Then in the second stage, the candidates are presented to a linear planning model to investigate the system optimal loadability, hence the optimal solution for SVC planning can be achieved. The method is presented to IEEE 300–bus system....

  17. The Evolution of Power System Planning with High Levels of Variable Renewable Generation

    Energy Technology Data Exchange (ETDEWEB)

    Katz, Jessica [National Renewable Energy Lab. (NREL), Golden, CO (United States); Milligan, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. This document, part of the Greening the Grid introduces the evolution of power system planning with high levels of variable renewable generation.

  18. SELF: expert system for supporting verification of network operating constraints in power transmission planning

    Energy Technology Data Exchange (ETDEWEB)

    Cicoria, R; Migliardi, P [Ente Nazionale per l` Energia Elettrica, Milan (Italy); Pogliano, P [Centro Informazioni Studi Esperienze (CISE), Milan (Italy)

    1995-06-01

    Performing planned studies into very large HV transmission systems is a very complex task which requires the use of simulation models and the application of the heuristic acquired by expert palnners during previous studies. The ENEL Electric Research Center and the CISE Artificial Intelligence Section have developed a knowledge-based system, named SELF, which is aimed at supporting the transmission system palnner. SELF is capable of assisting the engineer both in finding the convergence of the load flow calculation and determining solutions that respect active power, voltage and VAR operating constraints. This paper describes the overall architecture of the system and shows its integration in a larger planning environment called SPIRA, currently utilized at ENEL. More details are given on the least completed modules, the redispatching and network reinforcement subsystems which deal with active power constraint verification.

  19. Nuclear power programme planning: An integrated approach

    International Nuclear Information System (INIS)

    2001-12-01

    The International Atomic Energy Agency (IAEA) has published material on different policy considerations in the introduction of nuclear power, primarily addressed to top level decision makers in government and industry in Member States. Several Member States and experts recommended to the IAEA to address the aspects of an integrated approach to nuclear power programme planning and to serve as guidance to those countries wishing to embark on a nuclear power programme. As a follow-up, the present publication is primarily intended to serve as guidance for executives and managers in Member States in planning for possible introduction of nuclear power plants in their electricity generating systems. Nuclear power programme planning, as dealt with in this publication, includes all activities that need to be carried out up to a well-founded decision to proceed with a project feasibility study. Project implementation beyond this decision is not in the scope of this publication. Although it is possible to use nuclear energy as a heat source for industrial processes, desalination and other heat applications, it is assumed in this publication that the planning is aimed towards nuclear power for electricity generation. Much of the information given would, however, also be relevant for planning of nuclear reactors for heat production. The publication was prepared within the framework of the IAEA programme on nuclear power planning, implementation and performance as a joint activity of the Nuclear Power Engineering Section and the Planning and Economic Studies Section (Division of Nuclear Power)

  20. Balancing modern Power System with large scale of wind power

    DEFF Research Database (Denmark)

    Basit, Abdul; Altin, Müfit; Hansen, Anca Daniela

    2014-01-01

    Power system operators must ensure robust, secure and reliable power system operation even with a large scale integration of wind power. Electricity generated from the intermittent wind in large propor-tion may impact on the control of power system balance and thus deviations in the power system...... frequency in small or islanded power systems or tie line power flows in interconnected power systems. Therefore, the large scale integration of wind power into the power system strongly concerns the secure and stable grid operation. To ensure the stable power system operation, the evolving power system has...... to be analysed with improved analytical tools and techniques. This paper proposes techniques for the active power balance control in future power systems with the large scale wind power integration, where power balancing model provides the hour-ahead dispatch plan with reduced planning horizon and the real time...

  1. Energy and nuclear power planning study for Armenia

    International Nuclear Information System (INIS)

    2004-07-01

    The Energy and Nuclear Power Planning (ENPP) study for Armenia has been conducted under the technical cooperation programme of the International Atomic Energy Agency (IAEA). The objective of the study was to analyze the electricity demand as part of the total final energy demand in various scenarios of Armenian socioeconomic and technological development, and to develop economically optimized electric generating system expansion plans for meeting the electric power demand, and to assess the role that nuclear energy could play within these optimal programs. The specific objectives of this study were: to define the role that nuclear power could play in the future electricity supply in Armenia, based on a least-cost expansion planning analysis of the country's power system; to analyze the environmental impacts of such a nuclear power development; to evaluate the financial viability of the envisaged nuclear power development program; to train a group of Armenian experts in the use of the IAEA's energy models

  2. Offshore Wind Power Planning in Korea

    DEFF Research Database (Denmark)

    Seo, Chul Soo; Cha, Seung-Tae; Park, Sang Ho

    2012-01-01

    this possible, Korea has announced the National offshore power roadmap and is now in pursuit. However, large scale offshore wind farms can incur many problems, such as power quality problems, when connecting to a power system.[1][2] Thus, KEPCO is on the process of a research study to evaluate the effects...... that connecting offshore wind power generation to a power system has on the power system. This paper looks over offshore wind power planning in Korea and describes the development of impact assessment technology of offshore wind farms.......Wind power generation is globally recognized as the most universal and reliable form of renewable energy. Korea is currently depending mostly on coal and petroleum to generate electrical power and is now trying to replace them with renewable energy such as offshore wind power generation. To make...

  3. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  4. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 1: Chapters 1-11

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    As a continuation of its effort to provide comprehensive and impartial guidance to Member States facing the need for introducing nuclear power, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package for carrying out power generation expansion planning studies. WASP was originally developed in 1972 in the USA to meet the IAEA's needs to analyze the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. The model was first used by the IAEA to conduct global studies (Market Survey for Nuclear Power Plants in Developing Countries, 1972-1973) and to carry out Nuclear Power Planning Studies for several Member States. The WASP system developed into a very comprehensive planning tool for electric power system expansion analysis. Following these developments, the so-called WASP-Ill version was produced in 1979. This version introduced important improvements to the system, namely in the treatment of hydroelectric power plants. The WASP-III version has been continually updated and maintained in order to incorporate needed enhancements. In 1981, the Model for Analysis of Energy Demand (MAED) was developed in order to allow the determination of electricity demand, consistent with the overall requirements for final energy, and thus, to provide a more adequate forecast of electricity needs to be considered in the WASP study. MAED and WASP have been used by the Agency for the conduct of Energy and Nuclear Power Planning Studies for interested Member States. More recently, the VALORAGUA model was completed in 1992 as a means for helping in the preparation of the hydro plant characteristics to be input in the WASP study and to verify that the WASP overall optimized expansion plan takes also into account an optimization of the use of water for electricity generation. The combined application of VALORAGUA and WASP permits the

  5. Reactive power planning with FACTS devices using gravitational search algorithm

    Directory of Open Access Journals (Sweden)

    Biplab Bhattacharyya

    2015-09-01

    Full Text Available In this paper, Gravitational Search Algorithm (GSA is used as optimization method in reactive power planning using FACTS (Flexible AC transmission system devices. The planning problem is formulated as a single objective optimization problem where the real power loss and bus voltage deviations are minimized under different loading conditions. GSA based optimization algorithm and particle swarm optimization techniques (PSO are applied on IEEE 30 bus system. Results show that GSA can also be a very effective tool for reactive power planning.

  6. Northwest conservation and electric power plan 1986. Volume I

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    This 20 year plan is prepared in accordance with the Pacific Northwest Electric Power Planning and Conservation Act - Public Law 96-501, of 1980. This Act required the Council to develop and adopt a 20-year electrical power plan for the region with a program to protect, mitigate and enhance the fish and wildlife affected by hydroelectric development in the Columbia River Basin. The plan provides a 25 year history of the regions power development and comments on its unique features and changing nature. Presentations covers problems, solutions and the planning strategy for risk management. The existing electrical power system is discussed along with future electricity needs, generating resources, conservation of resources, regional needs and resources, and the 1986 action plan. Underlying details are provided in Volume II

  7. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Power systems engineering and mathematics

    CERN Document Server

    Knight, U G

    1972-01-01

    Power Systems Engineering and Mathematics investigates the application of mathematical aids, particularly the techniques of resource planning, to some of the technical-economic problems of power systems engineering. Topics covered include the process of engineering design and the use of computers in system design and operation; power system planning and operation; time scales and computation in system operation; and load prediction and generation capacity. This volume is comprised of 13 chapters and begins by outlining the stages in the synthesis of designs (or operating states) for engineerin

  9. Handbook of power systems I

    CERN Document Server

    Pardalos, P M; Pereira, Mario V; Iliadis, Niko A

    2010-01-01

    Energy is one of the world's most challenging problems, and power systems are an important aspect of energy-related issues. The Handbook of Power Systems contains state-of-the-art contributions on power systems modeling. In particular, it covers topics like operation planning, expansion planning, transmission and distribution modelling, computing technologies in energy systems, energy auctions, risk management, market regulation, stochastic programming in energy, and forecasting in energy. The book is separated into nine sections, which cover the most important areas of energy systems. The con

  10. A fuzzy knowledge based method for maintenance planning in a power system

    International Nuclear Information System (INIS)

    Sergaki, Amalia; Kalaitzakis, Kostas

    2002-01-01

    The inspection planning in electric power industry is used to assess the safety and reliability of system components and to increase the ability of failure situation identification before it actually occurs. It reflects the implications of the available information on the operational and maintenance history of the system. The output is a ranked list of components, with the most critical ones at the top, which indicates the selection of the components to be inspected. In this paper, we demonstrate the use of a fuzzy relational database model for manipulating the data required for the criticality component ranking in thermal power systems inspection planning, incorporating criteria concerning aspects of safety and reliability, economy, variable operational conditions and environmental impacts. Often, qualitative thresholds and linguistic terms are used for the component criticality analysis. Fuzzy linguistic terms for criteria definitions along with fuzzy inference mechanisms allow the exploitation of the operators' expertise. The proposed database model ensures the representation and handling of the aforementioned fuzzy information and additionally offers to the user the functionality for specifying the precision degree by which the conditions involved in a query are satisfied. In order to illustrate the behavior of the model, a case study is given using real inspection data

  11. Optimal reactive power planning for distribution systems considering intermittent wind power using Markov model and genetic algorithm

    Science.gov (United States)

    Li, Cheng

    Wind farms, photovoltaic arrays, fuel cells, and micro-turbines are all considered to be Distributed Generation (DG). DG is defined as the generation of power which is dispersed throughout a utility's service territory and either connected to the utility's distribution system or isolated in a small grid. This thesis addresses modeling and economic issues pertaining to the optimal reactive power planning for distribution system with wind power generation (WPG) units. Wind farms are inclined to cause reverse power flows and voltage variations due to the random-like outputs of wind turbines. To deal with this kind of problem caused by wide spread usage of wind power generation, this thesis investigates voltage and reactive power controls in such a distribution system. Consequently static capacitors (SC) and transformer taps are introduced into the system and treated as controllers. For the purpose of getting optimum voltage and realizing reactive power control, the research proposes a proper coordination among the controllers like on-load tap changer (OLTC), feeder-switched capacitors. What's more, in order to simulate its uncertainty, the wind power generation is modeled by the Markov model. In that way, calculating the probabilities for all the scenarios is possible. Some outputs with consecutive and discrete values have been used for transition between successive time states and within state wind speeds. The thesis will describe the method to generate the wind speed time series from the transition probability matrix. After that, utilizing genetic algorithm, the optimal locations of SCs, the sizes of SCs and transformer taps are determined so as to minimize the cost or minimize the power loss, and more importantly improve voltage profiles. The applicability of the proposed method is verified through simulation on a 9-bus system and a 30-bus system respectively. At last, the simulation results indicate that as long as the available capacitors are able to sufficiently

  12. Switch: a planning tool for power systems with large shares of intermittent renewable energy.

    Science.gov (United States)

    Fripp, Matthias

    2012-06-05

    Wind and solar power are highly variable, so it is it unclear how large a role they can play in future power systems. This work introduces a new open-source electricity planning model--Switch--that identifies the least-cost strategy for using renewable and conventional generators and transmission in a large power system over a multidecade period. Switch includes an unprecedented amount of spatial and temporal detail, making it possible to address a new type of question about the optimal design and operation of power systems with large amounts of renewable power. A case study of California for 2012-2027 finds that there is no maximum possible penetration of wind and solar power--these resources could potentially be used to reduce emissions 90% or more below 1990 levels without reducing reliability or severely raising the cost of electricity. This work also finds that policies that encourage customers to shift electricity demand to times when renewable power is most abundant (e.g., well-timed charging of electric vehicles) could make it possible to achieve radical emission reductions at moderate costs.

  13. Lagrangian relaxation technique in power systems operation planning: Multipliers updating problem

    Energy Technology Data Exchange (ETDEWEB)

    Ruzic, S. [Electric Power Utility of Serbia, Belgrade (Yugoslavia)

    1995-11-01

    All Lagrangian relaxation based approaches to the power systems operation planning have an important common part: the Lagrangian multipliers correction procedure. It is the subject of this paper. Different approaches presented in the literature are discussed and an original method for the Lagrangian multipliers updating is proposed. The basic idea of this new method is to update Lagrangian multipliers trying to satisfy Khun-Tucker optimality conditions. Instead of the dual function maximization the `distance of optimality function` is defined and minimized. If Khun-Tucker optimality conditions are satisfied the value of this function is in range (-1,0); otherwise the function has a big positive value. This method called `the distance of optimality method` takes into account future changes in planning generations due to the Lagrangian multipliers updating. The influence of changes in a multiplier associated to one system constraint to the satisfaction of some other system requirements is also considered. The numerical efficiency of the proposed method is analyzed and compared with results obtained using the sub-gradient technique. 20 refs, 2 tabs

  14. Estimation of power system variability due to wind power

    NARCIS (Netherlands)

    Papaefthymiou, G.; Verboomen, J.; Van der Sluis, L.

    2007-01-01

    The incorporation of wind power generation to the power system leads to an increase in the variability of the system power flows. The assessment of this variability is necessary for the planning of the necessary system reinforcements. For the assessment of this variability, the uncertainty in the

  15. Nuclear power planning study for Bangladesh

    International Nuclear Information System (INIS)

    1975-01-01

    The country's interest in and plans for nuclear power, as well as the organizational setup and involvement of the Bangladesh Atomic Energy Commission in the planning, construction and operation of nuclear power plants, are described. The report contains some data on population, general economics, gross national product, mineral resources and energy consumption. The electricity supply system, its development, generating and transmission facilities, costs of existing plants and plants under construction, various systems operation criteria, economic criteria and technical data on existing generating units are given. A number of appendixes have been included to provide additional and background information on the computer programs, methods of forecasting load, methodology and parameters used, fossil and nuclear fuel costs, general technical and economic data on thermal and nuclear plants, and other appropriate data

  16. Nuclear power planning and feasibility studies

    International Nuclear Information System (INIS)

    Streeton, D.F.

    1977-01-01

    This lecture will review the basic steps associated with planning the introduction of nuclear power. Areas covered will include power market surveys, energy resources evaluations, potential alternative strategies, organisational factors and implementational requirements. The lecture will then consider the implications and requirements associated with establishing the feasibility of a nuclear project. Among others, aspects of power systems integration, site selection reactor type evaluation, cost and economic analysis, influence of contracting strategies, comparison with alternative power generation solutions, financial impact, etc. will be discussed and reviewed. (HK) [de

  17. Tradeoffs in the design of health plan payment systems: Fit, power and balance.

    Science.gov (United States)

    Geruso, Michael; McGuire, Thomas G

    2016-05-01

    In many markets, including the new U.S. Marketplaces, health insurance plans are paid by risk-adjusted capitation, sometimes combined with reinsurance and other payment mechanisms. This paper proposes a framework for evaluating the de facto insurer incentives embedded in these complex payment systems. We discuss fit, power and balance, each of which addresses a distinct market failure in health insurance. We implement empirical metrics of fit, power, and balance in a study of Marketplace payment systems. Using data similar to that used to develop the Marketplace risk adjustment scheme, we quantify tradeoffs among the three classes of incentives. We show that an essential tradeoff arises between the goals of limiting costs and limiting cream skimming because risk adjustment, which is aimed at discouraging cream-skimming, weakens cost control incentives in practice. A simple reinsurance system scores better on our measures of fit, power and balance than the risk adjustment scheme in use in the Marketplaces. Copyright © 2016 Elsevier B.V. All rights reserved.

  18. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 1: Chapters 1-11

    International Nuclear Information System (INIS)

    1995-01-01

    As a continuation of its effort to provide comprehensive and impartial guidance to Member States facing the need for introducing nuclear power, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package for carrying out power generation expansion planning studies. WASP was originally developed in 1972 in the USA to meet the IAEA's needs to analyze the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. The model was first used by the IAEA to conduct global studies (Market Survey for Nuclear Power Plants in Developing Countries, 1972-1973) and to carry out Nuclear Power Planning Studies for several Member States. The WASP system developed into a very comprehensive planning tool for electric power system expansion analysis. Following these developments, the so-called WASP-Ill version was produced in 1979. This version introduced important improvements to the system, namely in the treatment of hydroelectric power plants. The WASP-III version has been continually updated and maintained in order to incorporate needed enhancements. In 1981, the Model for Analysis of Energy Demand (MAED) was developed in order to allow the determination of electricity demand, consistent with the overall requirements for final energy, and thus, to provide a more adequate forecast of electricity needs to be considered in the WASP study. MAED and WASP have been used by the Agency for the conduct of Energy and Nuclear Power Planning Studies for interested Member States. More recently, the VALORAGUA model was completed in 1992 as a means for helping in the preparation of the hydro plant characteristics to be input in the WASP study and to verify that the WASP overall optimized expansion plan takes also into account an optimization of the use of water for electricity generation. The combined application of VALORAGUA and WASP permits the

  19. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  20. An integrated stochastic multi-regional long-term energy planning model incorporating autonomous power systems and demand response

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Liu, Pei; Georgiadis, Michael C.

    2015-01-01

    The power sector faces a rapid transformation worldwide from a dominant fossil-fueled towards a low carbon electricity generation mix. Renewable energy technologies (RES) are steadily becoming a greater part of the global energy mix, in particular in regions that have put in place policies and measures to promote their utilization. This paper presents an optimization-based approach to address the generation expansion planning (GEP) problem of a large-scale, central power system in a highly uncertain and volatile electricity industry environment. A multi-regional, multi-period linear mixed-integer linear programming (MILP) model is presented, combining optimization techniques with a Monte Carlo (MCA) method and demand response concepts. The optimization goal concerns the minimization of the total discounted cost by determining optimal power capacity additions per time interval and region, and the power generation mix per technology and time period. The model is evaluated on the Greek power system (GPS), taking also into consideration the scheduled interconnection of the mainland power system with those of selected autonomous islands (Cyclades and Crete), and aims at providing full insight into the composition of the long-term energy roadmap at a national level. - Highlights: • A spatial, multi-period, long-term generation expansion planning model is presented. • A Monte-Carlo method along with a demand response mechanism are incorporated. • Autonomous power systems interconnection is considered. • Electricity and CO 2 emission trade are taken into account. • Lignite, natural gas and wind power comprise the dominant power technologies

  1. Efficient energy utilization and environmental issues applied to power planning

    International Nuclear Information System (INIS)

    Campbell, Hector; Montero, Gisela; Perez, Carlos; Lambert, Alejandro

    2011-01-01

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO 2 to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO 2 . The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO 2 . - Highlights: → We contrast power planning methods for supply electricity for economy development. → Importance of policies for electricity savings and efficient use in power planning. → Systemic planning facilitates decision-making process for electricity optimization. → Supply-side planning will cause climb in prices and loss of energy self-sufficiency. → Power planning should be immersed in an environment of appropriate energy policies.

  2. National development plan for transmission arrangement in the electric power system 1995-2005; Nasjonal utbyggingsplan for overfoeringsanlegg i elkraftsystemet 1995-2005

    Energy Technology Data Exchange (ETDEWEB)

    Moi, K.A.; Trengereid, F.

    1996-09-01

    The report concerns the national development plan for the electric power transmission system in Norway. The aim of the plan is to give a simple and collected survey of estimated demand of investment connected to the regional and central grids in the period from 1995 to 2005 based on these development plans, and to give a survey over the different power and energy prognoses being used. There is emphasized that the work of planning is a continuous process where changed premises can make an influence on both the schedule and the extent of necessary measures. The investment is calculated to be about NOK 15 billion in the period mentioned which comprise both new system designs and modernization of existing transmission systems. Dimensioned power capacity and the energy consumption are assumed to increase on an average of about 1.8 per cent towards the year of 2010. 10 figs., 2 tabs.

  3. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  4. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  5. Communicative planning as counter-power

    DEFF Research Database (Denmark)

    Elling, Bo

    2017-01-01

    This article presents a theory of communicative planning in which the power of citizens is conceived as a resource in the promotion of long-term planning against the short-term interests of investors in public planning. Its point of departure is the depiction of three planning paradigms – traditi......This article presents a theory of communicative planning in which the power of citizens is conceived as a resource in the promotion of long-term planning against the short-term interests of investors in public planning. Its point of departure is the depiction of three planning paradigms...... – traditional synoptic, incremental and participatory planning – and a critical discussion of different theories within the latter. In the light of this, it is argued that, in practice, planning authorities most often regard public participation as a problem, rather than as a potential. The article dismisses...... this conception and (a) conceptualizes planning on the basis of a Habermasian theory of communicative action and power, (b) shows that the participation of citizens is necessary to secure the inclusion of ethical and aesthetic rationalities in the planning process, and also that (c) citizens may constitute...

  6. First Aspect of Conventional Power System Assessment for High Wind Power Plants Penetration

    Directory of Open Access Journals (Sweden)

    A Merzic

    2012-11-01

    Full Text Available Most power systems in underdeveloped and developing countries are based on conventional power plants, mainly "slow-response" thermal power plants and a certain number of hydro power plants; characterized by inflexible generating portfolios and traditionally designed to meet own electricity needs. Taking into account operational capabilities of conventional power systems, their development planning will face problems with integration of notable amounts of installed capacities in wind power plants (WPP. This is what highlights the purpose of this work and in that sense, here, possible variations of simulated output power from WPP in the 10 minute and hourly time interval, which need to be balanced, are investigated, presented and discussed. Comparative calculations for the amount of installed power in WPP that can be integrated into a certain power system, according to available secondary balancing power amounts, in case of concentrated and dispersed future WPP are given. The stated has been done using a part of the power system of Bosnia and Herzegovina. In the considered example, by planned geographically distributed WPP construction, even up to cca. 74% more in installed power of WPP can be integrated into the power system than in case of geographically concentrated WPP construction, for the same available amount of (secondary balancing power. These calculations have shown a significant benefit of planned, geographically distributed WPP construction, as an important recommendation for the development planning of conventional power systems, with limited balancing options. Keywords: balancing reserves,  geographical dispersion, output power  variations

  7. PowerFilm PowerShade Fixed Site Solar System Cost Reduction Plan

    Science.gov (United States)

    2014-07-31

    system was designed which adds capability of grid tie connection to the standalone function. This battery operating system has built-in intelligence...goal concerning alternative conductive grid inks was to reduce the cost of the silver ink layer without a reduction in PV power with experimentation... system . To overcome this loss, a new BOS unit with higher power transfer efficiency has been developed. This system also has grid tie

  8. Profit Allocation of Hybrid Power System Planning in Energy Internet: A Cooperative Game Study

    Directory of Open Access Journals (Sweden)

    Jicheng Liu

    2018-02-01

    Full Text Available The rapid development of Energy Internet (EI has prompted numbers of generators to participate, leading to a hybrid power system. Hence, how to plan the hybrid power system and allocate its profit becomes necessary. In this paper, the cooperative game theory is introduced to discuss this problem. We first design the basic structure of EI, and point out the object of this study—coal power plant-wind farm-photovoltaic power station-energy storage provider (CWPE alliance. Subsequently, average allocation strategy (AAS, capacity-based allocation strategy (CAS and Shapley value allocation strategy (SAS are proposed, and then the modified disruption propensity (MDP index is constructed to judge the advantages and disadvantages of the three schemes. Thirdly, taking a certain area of A Province as an example, the profits of CWPE under three strategies are calculated respectively. Finally, by analyzing individual rationality and collective rationality of cooperative game and the MDP index of the three profit allocation schemes, we find that SAS is the most stable.

  9. Test plan: Brayton Isotope Power System Ground Demonstration System (BIPS-GDS)

    International Nuclear Information System (INIS)

    1976-01-01

    The purpose of this test plan is to provide an overall outline of all testing to be accomplished on the GDS. Included in this test plan are administrative requirements, instrumentation accuracies, instrumentation, equipment definitions, system test setup, and facility installation. The test program will enable collection of sufficient data to establish material, component, and system design integrity. The data will also be used to establish and evaluate component and system performance and reliability characteristics, verification of proper system component integration prior to initiation of Phase II, and flight system (FS) development

  10. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  11. Regional power systems planning: a state of the art assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  12. Dynamic Integrated Resource Strategic Planning Model: A Case Study of China’s Power Sector Planning into 2050

    Directory of Open Access Journals (Sweden)

    Yan Xu

    2017-07-01

    Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.

  13. Economic Operation of Power Systems with Significant Wind Power Penetration

    DEFF Research Database (Denmark)

    Farashbashi-Astaneh, Seyed-Mostafa

    This dissertation addresses economic operation of power systems with high penetration of wind power. Several studies are presented to address the economic operation of power systems with high penetration of variable wind power. The main concern in such power systems is high variability...... and unpredictability. Unlike conventional power plants, the output power of a wind farm is not controllable. This brings additional complexity to operation and planning of wind dominant power systems. The key solution in face of wind power uncertainty is to enhance power system flexibility. The enhanced flexibility......, cooperative wind-storage operation is studied. Lithium-Ion battery units are chosen as storage units. A novel formulation is proposed to investigate optimal operation of a storage unit considering power system balancing conditions and wind power imbalances. An optimization framework is presented to increase...

  14. Control of power plants and power systems. Proceedings

    International Nuclear Information System (INIS)

    Canales-Ruiz, R.

    1996-01-01

    The 88 papers in this volume constitute the proceedings of the International Federation of Automatic Control Symposium held in Mexico in 1995. The broad areas which they cover are: self tuning control; power plant operations; dynamic stability; fuzzy logic applications; power plants modelling; artificial intelligence applications; power plants simulation; voltage control; control of hydro electric units; state estimation; fault diagnosis and monitoring systems; system expansion and operation planning; security assessment; economic dispatch and optimal load flow; adaptive control; distribution; transient stability and preventive control; modelling and control of nuclear plant; knowledge data bases for automatic learning methods applied to power system dynamic security assessment; control of combined cycle units; power control centres. Separate abstracts have been prepared for the three papers relating to nuclear power plants. (UK)

  15. A fuzzy-stochastic power system planning model: Reflection of dual objectives and dual uncertainties

    International Nuclear Information System (INIS)

    Zhang, X.Y.; Huang, G.H.; Zhu, H.; Li, Y.P.

    2017-01-01

    In this study, a fuzzy stochastic dynamic fractional programming (FSDFP) method is proposed for supporting sustainable management of electric power system (EPS) under dual uncertainties. As an improvement upon the mixed-integer linear fractional programming, FSDFP can not only tackle multi-objective issues effectively without setting weights, but also can deal with uncertain parameters which have both stochastic and fuzzy characteristics. Thus, the developed method can help provide valuable information for supporting capacity-expansion planning and in-depth policy analysis of EPS management problems. For demonstrating these advantages, FSDFP has been applied to a case study of a typical regional EPS planning, where the decision makers have to deal with conflicts between economic development that maximizes the system profit and environmental protection that minimizes the carbon dioxide emissions. The obtained results can be analyzed to generate several decision alternatives, and can then help decision makers make suitable decisions under different input scenarios. Furthermore, comparisons of the solution from FSDFP method with that from fuzzy stochastic dynamic linear programming, linear fractional programming and dynamic stochastic fractional programming methods are undertaken. The contrastive analysis reveals that FSDFP is a more effective approach that can better characterize the complexities and uncertainties of real EPS management problems. - Highlights: • A fuzzy stochastic dynamic fractional programming (FSDFP) method is proposed. • FSDFP can address multiple conflicting objectives without setting weights. • FSDFP can reflect dual uncertainties with both stochastic and fuzzy characteristics. • Some reasonable solutions for a case of power system sustainable planning are generated. • Comparisons of the solutions from FSDFP with other optimization methods are undertaken.

  16. Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

    Science.gov (United States)

    Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott

    2012-01-01

    A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

  17. Solar power satellite system; Uchu hatsuden system

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, S [Institute of Space and Astronautical Science, Tokyo (Japan)

    1995-09-05

    The solar power satellite system is a system that converts solar energy into electric energy in the space, transmits power to earth through wireless resort such as microwave and supplies energy of new concept. In order to realize this system it is necessary to have new technologies such as space power transmission at low cost, construction of large space buildings and wireless high power transmission. In this paper, the principles, characteristics and the necessary technology of this system were explained. Besides Japan`s SPS2000 Plan (cooperative research by universities, government agencies and private corporations on the model of solar power satellite) the group of Europe, Russia and the United States has also proposed some ideas concerning the solar power satellite system. As far as the microwave power transmission, which is the key technology for solar power satellite system, is concerned, ground demonstration tests at the level of several tens of kW are discussed in Canada and France. 3 refs., 3 figs.

  18. Real-time impact of power balancing on power system operation with large scale integration of wind power

    DEFF Research Database (Denmark)

    Basit, Abdul; Hansen, Anca Daniela; Sørensen, Poul Ejnar

    2017-01-01

    Highly wind power integrated power system requires continuous active power regulation to tackle the power imbalances resulting from the wind power forecast errors. The active power balance is maintained in real-time with the automatic generation control and also from the control room, where...... power system model. The power system model takes the hour-ahead regulating power plan from power balancing model and the generation and power exchange capacities for the year 2020 into account. The real-time impact of power balancing in a highly wind power integrated power system is assessed...

  19. Planning and running of the hydro aggregates in the electric power system in the R. Macedonia

    International Nuclear Information System (INIS)

    Ilijovski, Igor

    2015-01-01

    The subject of the research in this master thesis is analysis of the main characteristics and control of the large Hydropower plants (HPPs) in the electric power system in R. Macedonia, which are subject to planning in the running tables. ELEM and MEPSO are using SCADA system for monitoring and control of the hydropower plants. The planning is a complex process where many aspects should be covered. With correct and optimal control of the hydro aggregates, depending on the hydrology, climate, elevation of the reservoirs and many other conditions, a better efficiency of the water resources usage may be obtained, which results in positive financial outcomes. (author)

  20. Smart power systems and renewable energy system integration

    CERN Document Server

    2016-01-01

    This monograph presents a wider spectrum of researches, developments, and case specific studies in the area of smart power systems and integration of renewable energy systems. The book will be for the benefit of a wider audience including researchers, postgraduate students, practicing engineers, academics, and regulatory policy makers. It covers a wide range of topics from fundamentals, and modelling and simulation aspects of traditional and smart power systems to grid integration of renewables; Micro Grids; challenges in planning and operation of a smart power system; risks, security, and stability in smart operation of a power system; and applied research in energy storage. .

  1. Impact of forecast errors on expansion planning of power systems with a renewables target

    DEFF Research Database (Denmark)

    Pineda, Salvador; Morales González, Juan Miguel; Boomsma, Trine Krogh

    2015-01-01

    This paper analyzes the impact of production forecast errors on the expansion planning of a power system and investigates the influence of market design to facilitate the integration of renewable generation. For this purpose, we propose a programming modeling framework to determine the generation...... and transmission expansion plan that minimizes system-wide investment and operating costs, while ensuring a given share of renewable generation in the electricity supply. Unlike existing ones, this framework includes both a day-ahead and a balancing market so as to capture the impact of both production forecasts...... and the associated prediction errors. Within this framework, we consider two paradigmatic market designs that essentially differ in whether the day-ahead generation schedule and the subsequent balancing re-dispatch are co-optimized or not. The main features and results of the model set-ups are discussed using...

  2. FY 2000 report on the demonstrative research for photovoltaic power generation system in Thailand. Demonstrative study on photovoltaic power generation grid-connected system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    In relation to the demonstrative study of the photovoltaic power system that is planned in Libong island, Thailand, the FY 2000 results were reported. In this R and D, construction/demonstrative operation were planned for a photovoltaic power station with a generation output of 100kW, photovoltaic power system in school facilities, and system for transmitting/distributing power to houses by connecting the power station and power system. In this fiscal year, the field survey was conducted together with the alteration from Yao Yai island, for which the demonstrative study was planned at first, to Libong island. The electric equipment was selected which met the requests from Thailand and the results of the field survey, and the basic design of the photovoltaic power generation/transmission/distribution system was completed. Based on this, the design/manufacture of photovoltaic power generation modules, power control equipment, measuring equipment, etc. were made. At the construction site of photovoltaic power station, construction work such as land formation was conducted. Further, Thai engineers who visited Japan did the following: discussions about power system, presence at test/inspection of photovoltaic power generation modules, visits to photovoltaic power stations, wind power stations, etc. (NEDO)

  3. Multi objective large power system planning under sever loading condition using learning DE-APSO-PS strategy

    International Nuclear Information System (INIS)

    Mahdad, Belkacem; Srairi, K.

    2014-01-01

    Highlights: • An efficient planning strategy using DE and APSO in coordination with PS algorithm is proposed. • An interactive process is proposed to balance the exploitation and exploration capability of (DE-APSO) and PS. • Fuel cost, power loss, and voltage deviation considering loading condition are optimized. • The proposed strategy (DE-APSO-PS) is validated on three large practical test systems. - Abstract: This paper introduces an efficient planning strategy using new hybrid interactive differential evolution (DE), adaptive particle swarm optimization (APSO), and pattern search (PS) for solving the security optimal power flow (SOPF) considering multi distributed static VAR compensator (SVC). Three objective functions such as fuel cost, power loss and voltage deviation are considered and optimized considering sever loading conditions. The main idea of the proposed strategy is that variable controls are optimized based on superposition mechanism, the best solutions evaluated by DE and APSO at specified stages are communicated to PS to exploit new regions around this solution, alternatively the new solution achieved by PS is also communicated to DE and APSO, this interactive mechanism search between global and local search is to balance the exploitation and exploration capability which allows individuals from different methods to react more by learning and changing experiences. The robustness of the proposed strategy is tested and validated on large practical power system test (IEEE 118-Bus, IEEE 300-Bus, and 40 units). Comparison results with the standard global optimization methods such as DE, APSO PS and to other recent techniques showed the superiority and perspective of the proposed hybrid technique for solving practical power system problems

  4. Power control and management of the grid containing largescale wind power systems

    Science.gov (United States)

    Aula, Fadhil Toufick

    The ever increasing demand for electricity has driven many countries toward the installation of new generation facilities. However, concerns such as environmental pollution and global warming issues, clean energy sources, high costs associated with installation of new conventional power plants, and fossil fuels depletion have created many interests in finding alternatives to conventional fossil fuels for generating electricity. Wind energy is one of the most rapidly growing renewable power sources and wind power generations have been increasingly demanded as an alternative to the conventional fossil fuels. However, wind power fluctuates due to variation of wind speed. Therefore, large-scale integration of wind energy conversion systems is a threat to the stability and reliability of utility grids containing these systems. They disturb the balance between power generation and consumption, affect the quality of the electricity, and complicate load sharing and load distribution managing and planning. Overall, wind power systems do not help in providing any services such as operating and regulating reserves to the power grid. In order to resolve these issues, research has been conducted in utilizing weather forecasting data to improve the performance of the wind power system, reduce the influence of the fluctuations, and plan power management of the grid containing large-scale wind power systems which consist of doubly-fed induction generator based energy conversion system. The aims of this research, my dissertation, are to provide new methods for: smoothing the output power of the wind power systems and reducing the influence of their fluctuations, power managing and planning of a grid containing these systems and other conventional power plants, and providing a new structure of implementing of latest microprocessor technology for controlling and managing the operation of the wind power system. In this research, in order to reduce and smooth the fluctuations, two

  5. Power system engineering planning, design, and operation of power systems and equipment

    CERN Document Server

    Schlabbach, Juergen

    2014-01-01

    With its focus on the requirements and procedures of tendering and project contracting, this book enables the reader to adapt the basics of power systems and equipment design to special tasks and engineering projects, e.g. the integration of renewable energy sources.

  6. Integrated Renewable Hydrogen Utility System (IRHUS) business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This business plan is for a proposed legal entity named IRHUS, Inc. which is to be formed as a subsidiary of Energy Partners, L.C. (EP) of West Palm Beach, Florida. EP is a research and development company specializing in hydrogen proton exchange membrane (PEM) fuel cells and systems. A fuel cell is an engine with no moving parts that takes in hydrogen and produces electricity. The purpose of IRHUS, Inc. is to develop and manufacture a self-sufficient energy system based on the fuel cell and other new technology that produces hydrogen and electricity. The product is called the Integrated renewable Hydrogen utility System (IRHUS). IRHUS, Inc. plans to start limited production of the IRHUS in 2002. The IRHUS is a unique product with an innovative concept in that it provides continuous electrical power in places with no electrical infrastructure, i.e., in remote and island locations. The IRHUS is a zero emissions, self-sufficient, hydrogen fuel generation system that produces electricity on a continuous basis by combining any renewable power source with hydrogen technology. Current plans are to produce a 10 kilowatt IRHUS MP (medium power). Future plans are to design and manufacture IRHUS models to provide power for a variety of power ranges for identified attractive market segments. The technological components of the IRHUS include an electrolyzer, hydrogen and oxygen storage subsystems, fuel cell system, and power control system. The IRHUS product is to be integrated with a variety of renewable energy technologies. 5 figs., 10 tabs.

  7. Biomass Supply Planning for Combined Heat and Power Plants using Stochastic Programming

    DEFF Research Database (Denmark)

    Guericke, Daniela; Blanco, Ignacio; Morales González, Juan Miguel

    method using stochastic optimization to support the biomass supply planning for combined heat and power plants. Our two-phase approach combines mid-term decisions about biomass supply contracts with the short-term decisions regarding the optimal market participation of the producer to ensure......During the last years, the consumption of biomass to produce power and heat has increased due to the new carbon neutral policies. Nowadays, many district heating systems operate their combined heat and power (CHP) plants using different types of biomass instead of fossil fuel, especially to produce......, and heat demand and electricity prices vary drastically during the planning period. Furthermore, the optimal operation of combined heat and power plants has to consider the existing synergies between the power and heating systems while always fulfilling the heat demand of the system. We propose a solution...

  8. Reliability modeling and analysis of smart power systems

    CERN Document Server

    Karki, Rajesh; Verma, Ajit Kumar

    2014-01-01

    The volume presents the research work in understanding, modeling and quantifying the risks associated with different ways of implementing smart grid technology in power systems in order to plan and operate a modern power system with an acceptable level of reliability. Power systems throughout the world are undergoing significant changes creating new challenges to system planning and operation in order to provide reliable and efficient use of electrical energy. The appropriate use of smart grid technology is an important drive in mitigating these problems and requires considerable research acti

  9. A Stochastic Operational Planning Model for Smart Power Systems

    Directory of Open Access Journals (Sweden)

    Sh. Jadid

    2014-12-01

    Full Text Available Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independent system operator should use a stochastic method to manage them. A Stochastic unit commitment is presented in this paper to schedule various power resources such as distributed generation units, conventional thermal generation units, wind and PV farms, and demand response resources. Demand response resources, interruptible loads, distributed generation units, and conventional thermal generation units are used to provide required reserve for compensating stochastic nature of various resources and loads. In the presented model, resources connected to distribution network can participate in wholesale market through aggregators. Moreover, a novel three-program model which can be used by aggregators is presented in this article. Loads and distributed generation can contract with aggregators by these programs. A three-bus test system and the IEEE RTS are used to illustrate usefulness of the presented model. The results show that ISO can manage the system effectively by using this model

  10. Interesting tools for the cybersecurity plan of a nuclear power plant

    International Nuclear Information System (INIS)

    Pareja, I.; Carrasco, J. A.; Cerro, F. J. del

    2012-01-01

    The use of digital technologies in monitoring and control systems of nuclear power plants and their connectivity requirements, originate cybersecurity difficulties that should be addressed in a cybersecurity plan. This plan should guide the policies and procedures followed during the design maintenance and operation of the systems inside a nuclear power plant. It also should refer to adequate tools able to reach the established cybersecurity requirements. The combination of Datadiodes and tools for publishing video(like tVGA2web), permit an isolation and remote maintenance in a 100% safety way and their use should be disseminated. In the paper other type of tools useful for nuclear power plants are also mentioned.

  11. Diversification criteria for power systems

    International Nuclear Information System (INIS)

    Kharbach, Mohammed

    2016-01-01

    Growing power demand, fuel availability and prices, technology changes, the environmental impacts of energy consumption, the changing regulatory environments and the uncertainties around such elements make the planning for optimal power mix a challenging task. The diversity approach is advocated as a most appropriate planning methodology for the optimal energy mix (Hickey et al., 2010). Shannon Wiener Index (SWI), which is the most cited diversity metric has been used to assess power systems diversity mainly from an energy perspective. To our best knowledge, there is no rigorous justification why energy has been the main variable used in diversification exercises rather than other variables such as capacity. We use a stylized power generation framework to show that diversity based on energy or capacity could lead to different outcomes in terms of vulnerability to fuel exposure, among others. We also introduce a Shannon Wiener Index ratio (SWIR) that we believe captures better the diversity of a power system compared to the standard SWI. - Highlights: • Ranking power systems, from a diversity perspective, based on one criteria has many shortcomings. • Diversity based on energy or capacity could lead to different outcomes in terms of vulnerability to fuel exposure, among others. • A Shannon Wiener Index ratio (SWIR) captures better the diversity of a power system compared to the standard SWI.

  12. Photovoltaic power system reliability considerations

    Science.gov (United States)

    Lalli, V. R.

    1980-01-01

    This paper describes an example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems. This particular application was for a solar cell power system demonstration project in Tangaye, Upper Volta, Africa. The techniques involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of a fail-safe and planned spare parts engineering philosophy.

  13. U.S. Department of Energy Space and Defense Power Systems Program Ten-Year Strategic Plan, Volume 1 and Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Dwight, Carla

    2013-06-01

    The Department of Energy's Space and Defense Power Systems program provides a unique capability for supplying power systems that function in remote or hostile environments. This capability has been functioning since the early 1960s and counts the National Aeronautics and Space Administration as one of its most prominent customers. This enabling technology has assisted the exploration of our solar system including the planets Jupiter, Saturn, Mars, Neptune, and soon Pluto. This capability is one-of-kind in the world in terms of its experience (over five decades), breadth of power systems flown (over two dozen to date) and range of power levels (watts to hundreds of watts). This document describes the various components of that infrastructure, work scope, funding needs, and its strategic plans going forward.

  14. Large-scale utilization of wind power in China: Obstacles of conflict between market and planning

    International Nuclear Information System (INIS)

    Zhao Xiaoli; Wang Feng; Wang Mei

    2012-01-01

    The traditional strict planning system that regulates China's power market dominates power industry operations. However, a series of market-oriented reforms since 1997 call for more decentralized decision-making by individual market participants. Moreover, with the rapid growth of wind power in China, the strict planning system has become one of the significant factors that has curtailed the generation of wind power, which contradicts with the original purpose of using the government's strong control abilities to promote wind power development. In this paper, we first present the reasons why market mechanisms are important for large-scale utilization of wind power by using a case analysis of the Northeast Grid, and then we illustrate the impact of conflicts between strict planning and market mechanisms on large-scale wind power utilization. Last, we explore how to promote coordination between markets and planning to realize large-scale wind power utilization in China. We argue that important measures include implementing flexible power pricing mechanisms instead of the current fixed pricing approach, formulating a more reasonable mechanism for distributing benefits and costs, and designing an appropriate market structure for large-scale wind power utilization to promote market liquidity and to send clear market equilibrium signals. - Highlights: ► We present the reasons why market is important for utilization of wind power. ► We discuss the current situation of the conflict between planning and market. ► We study the impact of conflict between planning and market on wind power output. ► We argue how to promote coordination between market and planning.

  15. Wind power integration into the automatic generation control of power systems with large-scale wind power

    DEFF Research Database (Denmark)

    Basit, Abdul; Hansen, Anca Daniela; Altin, Müfit

    2014-01-01

    Transmission system operators have an increased interest in the active participation of wind power plants (WPP) in the power balance control of power systems with large wind power penetration. The emphasis in this study is on the integration of WPPs into the automatic generation control (AGC......) of the power system. The present paper proposes a coordinated control strategy for the AGC between combined heat and power plants (CHPs) and WPPs to enhance the security and the reliability of a power system operation in the case of a large wind power penetration. The proposed strategy, described...... and exemplified for the future Danish power system, takes the hour-ahead regulating power plan for generation and power exchange with neighbouring power systems into account. The performance of the proposed strategy for coordinated secondary control is assessed and discussed by means of simulations for different...

  16. Contribution to the operating energy planning of hydrothermal power systems; Contribuicao ao planejamento da operacao energetica de sistemas hidrotermicos de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Carneiro, Adriano Alber de Franca Mendes

    1991-08-01

    This work treats of the problem of the planning of the energy operation of hydrothermal power systems, gone back to those with predominance of hydraulic generation, as it is the case of the Brazilian system. The work makes an analysis of the problem of the planning of the energy operation of systems hydrothermal leaving of the concepts and nature of this problem. Their inherent difficulties are shown and they come the main approaches in operation in countries with predominance of hydroelectric generation. It still introduces the methodology in energy planning in Brazil being pointed their main limitations. Finally an alternative model for the planning of the energy operation of the system brazilian hydrothermal, based on the made studies is also presented.

  17. Nonlinear integrated resource strategic planning model and case study in China's power sector planning

    International Nuclear Information System (INIS)

    Yuan, Jiahai; Xu, Yan; Kang, Junjie; Zhang, Xingping; Hu, Zheng

    2014-01-01

    In this paper we expand the IRSP (integrated resource strategic planning) model by including the external cost of TPPs (traditional power plants) and popularization cost of EPPs (efficiency power plants) with nonlinear functions. Case studies for power planning in China during 2011–2021 are conducted to show the efficacy of the model. Scenarios are compiled to compare the pathways of power planning under different policies. Results show that: 1) wind power will become competitive with technical learning, but its installation is undesirable when the external cost of coal power is not internalized; 2) the existence of popularization cost will hinder EPPs' (efficiency power plants) deployment and pure market mechanism is not enough to deliver EPPs at socially desirable scale; 3) imposition of progressive emission tax on coal power at an average of 0.15–0.20 RMB/KWh can remedy the market distortion and promote the development of wind power by a significant margin; 4) nuclear power will grow stably when its external cost is set no more than 0.187 RMB per KWh, or 87% of its internal cost. The proposed model can serve as a useful tool for decision support in the process of power planning and policy formulation for national government. - Highlights: • Improve IRSP model by adding nonlinear external and popularization cost. • The model is used to conduct China's power sector planning in 2011–2021. • Simulate the impacts of alternative energy policies on planning results. • The model can be used for joint power sector planning and policy design

  18. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  19. Power system optimization

    International Nuclear Information System (INIS)

    Bogdan, Zeljko; Cehil, Mislav

    2007-01-01

    Long-term gas purchase contracts usually determine delivery and payment for gas on the regular hourly basis, independently of demand side consumption. In order to use fuel gas in an economically viable way, optimization of gas distribution for covering consumption must be introduced. In this paper, a mathematical model of the electric utility system which is used for optimization of gas distribution over electric generators is presented. The utility system comprises installed capacity of 1500 MW of thermal power plants, 400 MW of combined heat and power plants, 330 MW of a nuclear power plant and 1600 MW of hydro power plants. Based on known demand curve the optimization model selects plants according to the prescribed criteria. Firstly it engages run-of-river hydro plants, then the public cogeneration plants, the nuclear plant and thermal power plants. Storage hydro plants are used for covering peak load consumption. In case of shortage of installed capacity, the cross-border purchase is allowed. Usage of dual fuel equipment (gas-oil), which is available in some thermal plants, is also controlled by the optimization procedure. It is shown that by using such a model it is possible to properly plan the amount of fuel gas which will be contracted. The contracted amount can easily be distributed over generators efficiently and without losses (no breaks in delivery). The model helps in optimizing of fuel gas-oil ratio for plants with combined burners and enables planning of power plants overhauls over a year in a viable and efficient way. (author)

  20. New Brunswick Power Corporation: Business plan, 1994-1999

    International Nuclear Information System (INIS)

    1994-02-01

    The first publicly available business plan for the New Brunswick Power Corp. is presented. The five-year plan provides an overview of the Corporation's performance and directions, including possible future rate increases. A review of the corporate history of the utility is followed by a description of the strategic framework under which the Corporation conducts its business operations. The information presented includes customer requirements, power generation and transmission, system operations, personnel management, environmental protection, and external factors affecting operations. This overview demonstrates the complex issues facing the utility, the choices made in the past, and the matters that will have to be faced in the future. The business overview is followed by focused business plans in six key functional areas (facilities, operations, personnel, technology, environment, and finances) and comprehensive financial forecasts that outline a commitment to maintain competitive rates for customers. The reasoning behind the forecasts is explained and a glossary is included. 21 figs., 16 tabs

  1. Guidance for emergency planning in nuclear power plants

    International Nuclear Information System (INIS)

    Magnusson, Tommy; Ekdahl, Maria

    2008-06-01

    Ringhals has been a model for this study, but the purpose has been to make the report applicable at all nuclear power plants in Sweden. The work has been done in close co-operation with the Swedish nuclear power plants and Rescue Services in the nuclear power municipalities Oesthammar, Oskarshamn, and Varberg. The internal fire brigade at the nuclear power plants has also been involved. A document will also be published as a further guidance at efforts of the type fires, which are mentioned in the enclosed document. After a fire in a switchgear room in 2005 the need of making the existing effort planning more effective at nuclear power plants was observed. The idea with the planning is to plan the effort in order to give the operational and emergency staff a good and actual support to come to a decision and to start the mission without delay. The risk information is showed by planning layouts, symbols and drawings as basis, give risk information and effort information. The effort information shows outer arrangements, manual action points, fire installations, passive fire safety etc. The risk information is shown by risk symbols. Their purpose is to give a fast overview of the existing risks. Reactor safety effects is the ruling influence if an effort has to be done in order to secure safety for a third person. In order to make an effort in an area personal risks for rescue staff, such as electricity risks, radiological risks, chemicals and gas bottles with compressed gases, has to be eliminated. For complicated missions detailed instructions are needed in order to handle specific risks. In a group discussion different people with pertinent knowledge has to value which problematic efforts need detailed instruction. Missions that have to be analyzed in a work group as above are: fire may affect the reactor safety, fire that may threaten the structural integrity, chemical discharge with big consequence on environment/third person and handling of gas system (compressed

  2. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Energy Technology Data Exchange (ETDEWEB)

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  3. Digital simulation of power electronic systems

    International Nuclear Information System (INIS)

    Mehring, P.; Jentsch, W.; John, G.; Kraemer, D.

    1981-01-01

    The following paper contains the final report on the NETSIM-Project. The purpose of this project is to develop a special digital simulation system, which could serve as a base for routine application of simulation in planning and development of power electronic systems. The project is realized in two steps. First a basic network analysis system is established. With this system the basic models and methods in treating power electronic networks could be probed. The resulting system is then integrated into a general digital simulation system for continous systems (CSSL-System). This integrated simulation system allows for convenient modeling and simulation of power electronic systems. (orig.) [de

  4. Energy and nuclear power planning study for Algeria

    International Nuclear Information System (INIS)

    1985-01-01

    This study, conducted jointly by a team of engineers and economists from the Sonelgaz company and the IAEA, had three objectives: (1) To perform a preliminary economic study aimed at initiating thinking on the role that nuclear power could play in Algeria's long-term energy structure and to suggest reasonable hypotheses on what share of the energy market nuclear power might supply. (2) To train a team of Algerian engineers and economists in long-term economic planning techniques. Once the team has gained a basic knowledge through this preliminary study, it will be in a position to continue the process, to perform other, more detailed independent analyses and to review the entire process should economic conditions change. (3) To introduce in Algeria the computer techniques and facilities needed to carry out such energy investment planning studies for electricity production. The main aim throughout the studies was to train a team of Algerian engineers in energy planning rather than to come to definitive conclusions on the problem of introducing nuclear power in Algeria. Two successive analyses were performed. The first consisted in evaluating the final energy requirements which will result in the medium and long term (by 2015) from the implementation of the economic development policies in the Five Year Plan (up to 1984) and in the proposals for the next decade (up to 1990) being studied by the Algerian Ministry of Planning. The second part is concerned only with the results regarding future electricity requirements, which are used as input data in studying the optimization of Algeria's future electricity generating system. Various methods of generation are analysed and included in an econometric model in order to make a sequential determination of the most economic composition of power generating capacity

  5. 2015 Plan. Project 5: transmission systems of electric power

    International Nuclear Information System (INIS)

    1992-12-01

    The planning aspects of transmission system expansion in Brazil are described, mentioning the evolution at long date of the transmission system, emphasizing the qualitative and strategic aspects. The engineering aspects and the technological development are also presented. (C.G.C.)

  6. Optimal Investment Planning of Bulk Energy Storage Systems

    Directory of Open Access Journals (Sweden)

    Dina Khastieva

    2018-02-01

    Full Text Available Many countries have the ambition to increase the share of renewable sources in electricity generation. However, continuously varying renewable sources, such as wind power or solar energy, require that the power system can manage the variability and uncertainty of the power generation. One solution to increase flexibility of the system is to use various forms of energy storage, which can provide flexibility to the system at different time ranges and smooth the effect of variability of the renewable generation. In this paper, we investigate three questions connected to investment planning of energy storage systems. First, how the existing flexibility in the system will affect the need for energy storage investments. Second, how presence of energy storage will affect renewable generation expansion and affect electricity prices. Third, who should be responsible for energy storage investments planning. This paper proposes to assess these questions through two different mathematical models. The first model is designed for centralized investment planning and the second model deals with a decentralized investment approach where a single independent profit maximizing utility is responsible for energy storage investments. The models have been applied in various case studies with different generation mixes and flexibility levels. The results show that energy storage system is beneficial for power system operation. However, additional regulation should be considered to achieve optimal investment and allocation of energy storage.

  7. Nuclear power in Asia: Experience and plans

    International Nuclear Information System (INIS)

    Lee Chang Kun

    1999-01-01

    Asian countries have developed ambitious energy supply programs to expand their energy supply systems to meet the growing needs of their rapidly expanding economies. Most of their new electrical generation needs will be met by coal, oil and gas. However, the consideration of growing energy demand, energy security, environmental conservation, and technology enhancement is inducing more Asian countries toward the pursuit of nuclear power development. At present, nuclear power provides about 30% of electricity in Japan, and about 40% of electricity in Korea. These and other Asian countries are presumed to significantly increase their nuclear power generation capacities in coming years. Korea's nuclear power generation facilities are projected to grow from 12 gigawatt in 1998 to 16.7 gigawatt by 2004. On the other hand, China and India have now installed nuclear capacities of about 2 gigawatt, respectively, which will increase by a factor of two or more by 2004. The installed nuclear capacity in the Asian region totalled 67 gigawatt as of the end of 1997, representing about sixteen percent of the world capacity of 369 gigawatt. Looking to the year 2010, it is anticipated that most of the world's increase in nuclear capacity will come from Asia. It is further forecasted that Asian nations will continue to expand their nuclear capacity as they move into the 21st century. For example, China plans to develop additional 18 gigawatt of nuclear power plants by the year 2010. Nuclear power is also of particular interest to a number of emerging Asian countries in view of environmental conservation and mitigation of greenhouse gas emissions in particular. Nuclear power appeals to some countries because of its high technology content. The strength in an advanced technology, such as the technological capability related to nuclear power, contributes to the overall development of the corresponding country's engineering base, enhancement of industrial infrastructure and expansion of

  8. Planning renewable energy in electric power system for sustainable development under uncertainty – A case study of Beijing

    International Nuclear Information System (INIS)

    Nie, S.; Huang, Charley Z.; Huang, G.H.; Li, Y.P.; Chen, J.P.; Fan, Y.R.; Cheng, G.H.

    2016-01-01

    Highlights: • Interval type-2 fuzzy fractional programming is developed to optimize ratio problem. • It is advantageous in reflecting conflicting objectives and complex uncertainties. • Uncertainties existed as interval numbers and type-2 fuzzy intervals are quantified. • Results reveal that share of renewable power generation in gross supply increase. • Alternative to manage mixed energy system with sustainable development is suggested. - Abstract: An interval type-2 fuzzy fractional programming (IT2FFP) method is developed for planning the renewable energy in electric power system for supporting sustainable development under uncertainty. IT2FFP can tackle output/input ratio problems where complex uncertainties are expressed as type-2 fuzzy intervals (T2FI) with uncertain membership functions. The IT2FFP method is then applied to planning Beijing electric power system, where issues of renewable energy utilization, electricity supply security, and pollutant/greenhouse gas (GHG) emissions mitigation are incorporated within the modeling formulation. The obtained results suggest that the coal-fired power would continue to decrease and the share of renewable energy in gross electricity supply would maintain an increasing trend. Results also reveal that imported electricity plays a significant role in the city’s energy supply. A number of decision alternatives are also analyzed based on the interval solutions as well as the projected applicable conditions, which represent multiple options with sustainable and economic considerations. The optimal alternative that can give rise to the desirable sustainable option under the maximization of the share of renewable power generation has been suggested. The findings can help decision makers identify desired alternatives for managing such a mixed energy system in association with sustainable development. Compared with the conventional optimization methods that optimize single criterion, it is proved that IT2FFP is

  9. Power system dynamics and stability with synchrophasor measurement and power system toolbox

    CERN Document Server

    Sauer, Peter W; Chow, Joe H

    2017-01-01

    This new edition addresses the needs of dynamic modeling and simulation relevant to power system planning, design, and operation, including a systematic derivation of synchronous machine dynamic models together with speed and voltage control subsystems. Reduced-order modeling based on integral manifolds is used as a firm basis for understanding the derivations and limitations of lower-order dynamic models. Following these developments, a multi-machine model interconnected through the transmission network is formulated and simulated using numerical simulation methods. Energy function methods are discussed for direct evaluation of stability. Small-signal analysis is used for determining the electromechanical modes and mode-shapes, and for power system stabilizer design. Time-synchronized high-sampling-rate phasor measurement units (PMUs) to monitor power system disturbances ave been implemented throughout North America and many other countries. In this second edition, new chapters on synchrophasor measurement ...

  10. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  11. System model for evaluation of an emergency response plan for a nuclear power plant based on an assessment of nuclear emergency exercises

    International Nuclear Information System (INIS)

    Silva, Marcos Vinicius C.; Medeiros, Jose A.C.C.

    2011-01-01

    Nuclear power plants are designed and built with systems dedicated to provide a high degree of protection to its workers, the population living in their neighborhoods and the environment. Among the requirements for ensuring safety there are the existence of the nuclear emergency plan. Due to the relationship between the actions contemplated in the emergency plan and the nuclear emergency exercise, it becomes possible to assess the quality of the nuclear emergency plan, by means of emergency exercise evaluation, The techniques used in this work aim at improving the evaluation method of a nuclear emergency exercise through the use of performance indicators in the evaluation of the structures, actions and procedures involved. The proposed model enables comparisons between different moments of an emergency plan directed to a nuclear power plant as well as comparisons between plans dedicated to different facilities. (author)

  12. System model for evaluation of an emergency response plan for a nuclear power plant based on an assessment of nuclear emergency exercises

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Marcos Vinicius C.; Medeiros, Jose A.C.C. [Universidade Federal do Rio de Janeiro (PEN/COPPE/UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-Graduacao de Engenharia. Programa de Engenharia Nuclear

    2011-07-01

    Nuclear power plants are designed and built with systems dedicated to provide a high degree of protection to its workers, the population living in their neighborhoods and the environment. Among the requirements for ensuring safety there are the existence of the nuclear emergency plan. Due to the relationship between the actions contemplated in the emergency plan and the nuclear emergency exercise, it becomes possible to assess the quality of the nuclear emergency plan, by means of emergency exercise evaluation, The techniques used in this work aim at improving the evaluation method of a nuclear emergency exercise through the use of performance indicators in the evaluation of the structures, actions and procedures involved. The proposed model enables comparisons between different moments of an emergency plan directed to a nuclear power plant as well as comparisons between plans dedicated to different facilities. (author)

  13. Reliability planning in distributed electric energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.

    1978-10-01

    The goal of this paper is to develop tools for technology evaluation that address questions involving the economics of large-scale systems. The kind of cost discussed usually involves some dynamic aspect of the energy system. In particular, such properties as flexibility, stability, and resilience are features of entire systems. Special attention must be paid to the question of reliability, i.e., availability on demand. The storage problem and the planning for reliability in utility systems are the subjects of this paper. The introductory chapter addresses preliminary definitions--reliability planning, uncertainty, resilience, and other sensitivities. The study focuses on the contrast between conventional power generation technologies with controllable output and intermittent resources such as wind and solar electric conversion devices. The system studied is a stylized representation of California conditions. Significant differences were found in reliability planning requirements (and therefore costs) for systems dominated by central station plants as opposed to those dominated by intermittent resource technologies. It is argued that existing hydroelectric facilities need re-optimization. These plants provide the only currently existing bulk power storage in electric energy systems. 38 references. (MCW)

  14. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  15. Robustness Area Technique Developing Guidelines for Power System Restoration

    Directory of Open Access Journals (Sweden)

    Paulo Murinelli Pesoti

    2017-01-01

    Full Text Available This paper proposes a novel energy based technique called the Robustness Area (RA technique that measures power system robustness levels, as a helper for planning Power System Restorations (PSRs. The motivation is on account of the latest blackouts in Brazil, where the local Independent System Operator (ISO encountered difficulties related to circuit disconnections during the restoration. The technique identifies vulnerable and robust buses, pointing out system areas that should be firstly reinforced during PSR, in order to enhance system stability. A Brazilian power system restoration area is used to compare the guidelines adopted by the ISO with a more suitable new plan indicated by the RA tool. Active power and reactive power load margin and standing phase angle show the method efficiency as a result of a well balanced system configuration, enhancing the restoration performance. Time domain simulations for loop closures and severe events also show the positive impact that the proposed tool brings to PSRs.

  16. Pre-fire planning for nuclear power plants

    International Nuclear Information System (INIS)

    Talbert, J.H.

    1980-01-01

    Regardless of the fire prevention measures which are taken, plant experience indicates that fires will occur in a nuclear power plant. When a fire occurs, the plant staff must handle the fire emergency. Pre-fire planning is a method of developing detailed fire attack plans and salvage operations to protect equipment from damage due to fire and fire fighting operations. This paper describes the purpose and use of a pre-fire plan to achieve these goals in nuclear power plants

  17. Development of an autonomous power system testbed

    International Nuclear Information System (INIS)

    Barton, J.R.; Adams, T.; Liffring, M.E.

    1985-01-01

    A power system testbed has been assembled to advance the development of large autonomous electrical power systems required for the space station, spacecraft, and aircraft. The power system for this effort was designed to simulate single- or dual-bus autonomous power systems, or autonomous systems that reconfigure from a single bus to a dual bus following a severe fault. The approach taken was to provide a flexible power system design with two computer systems for control and management. One computer operates as the control system and performs basic control functions, data and command processing, charge control, and provides status to the second computer. The second computer contains expert system software for mission planning, load management, fault identification and recovery, and sends load and configuration commands to the control system

  18. Western Area Power Administration. Combined power system financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-26

    This report presents the results of the independent certified public accountants` audit of the Western Area Power Administration`s combined power system statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Westerns internal control structure disclosed three new reportable conditions concerning the lack of: (1) a reconciliation of stores inventory from subsidiary ledgers to summary financial information, (2) communication of interest during construction and related adjustments to interest on Federal investment, and (3) a system to prevent and detect power billing errors. None of the conditions were considered to be material weaknesses. Western provided concurrence and corrective action plans. The auditors` report on Western`s compliance with laws and regulations also disclosed two new instances of noncompliance. Western failed to calculate nonreimbursable expenses in accordance with the Grand Canyon Protection Act and had an unexplained difference in gross Federal investment balances used to calculate interest on Federal investment. Western provided concurrence and corrective action plans for the instances.

  19. GPS synchronized power system phase angle measurements

    Science.gov (United States)

    Wilson, Robert E.; Sterlina, Patrick S.

    1994-09-01

    This paper discusses the use of Global Positioning System (GPS) synchronized equipment for the measurement and analysis of key power system quantities. Two GPS synchronized phasor measurement units (PMU) were installed before testing. It was indicated that PMUs recorded the dynamic response of the power system phase angles when the northern California power grid was excited by the artificial short circuits. Power system planning engineers perform detailed computer generated simulations of the dynamic response of the power system to naturally occurring short circuits. The computer simulations use models of transmission lines, transformers, circuit breakers, and other high voltage components. This work will compare computer simulations of the same event with field measurement.

  20. A stochastic MILP energy planning model incorporating power market dynamics

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Nazos, Konstantinos

    2017-01-01

    Highlights: •Stochastic MILP model for the optimal energy planning of a power system. •Power market dynamics (offers/bids) are incorporated in the proposed model. •Monte Carlo method for capturing the uncertainty of some key parameters. •Analytical supply cost composition per power producer and activity. •Clean dark and spark spreads are calculated for each power unit. -- Abstract: This paper presents an optimization-based methodological approach to address the problem of the optimal planning of a power system at an annual level in competitive and uncertain power markets. More specifically, a stochastic mixed integer linear programming model (MILP) has been developed, combining advanced optimization techniques with Monte Carlo method in order to deal with uncertainty issues. The main focus of the proposed framework is the dynamic formulation of the strategy followed by all market participants in volatile market conditions, as well as detailed economic assessment of the power system’s operation. The applicability of the proposed approach has been tested on a real case study of the interconnected Greek power system, quantifying in detail all the relevant technical and economic aspects of the system’s operation. The proposed work identifies in the form of probability distributions the optimal power generation mix, electricity trade at a regional level, carbon footprint, as well as detailed total supply cost composition, according to the assumed market structure. The paper demonstrates that the proposed optimization approach is able to provide important insights into the appropriate energy strategies designed by market participants, as well as on the strategic long-term decisions to be made by investors and/or policy makers at a national and/or regional level, underscoring potential risks and providing appropriate price signals on critical energy projects under real market operating conditions.

  1. Kilowatt Isotope Power System: component report for the Ground Demonstration System Accumulator

    International Nuclear Information System (INIS)

    Brainard, E.L.

    1978-01-01

    The Model Number ORC1A3A01 System Accumulator for the Kilowatt Isotope Power System was expulsion tested and demonstrated to be in compliance with the requirements of Sundstrand Explusion Test Procedure, TP 400. Test requirements of TP 400 were extracted from the Kilowatt Isotope Power System, Ground Demonstration System Test Plan

  2. Wind power integration into the automatic generation control of power systems with large-scale wind power

    Directory of Open Access Journals (Sweden)

    Abdul Basit

    2014-10-01

    Full Text Available Transmission system operators have an increased interest in the active participation of wind power plants (WPP in the power balance control of power systems with large wind power penetration. The emphasis in this study is on the integration of WPPs into the automatic generation control (AGC of the power system. The present paper proposes a coordinated control strategy for the AGC between combined heat and power plants (CHPs and WPPs to enhance the security and the reliability of a power system operation in the case of a large wind power penetration. The proposed strategy, described and exemplified for the future Danish power system, takes the hour-ahead regulating power plan for generation and power exchange with neighbouring power systems into account. The performance of the proposed strategy for coordinated secondary control is assessed and discussed by means of simulations for different possible future scenarios, when wind power production in the power system is high and conventional production from CHPs is at a minimum level. The investigation results of the proposed control strategy have shown that the WPPs can actively help the AGC, and reduce the real-time power imbalance in the power system, by down regulating their production when CHPs are unable to provide the required response.

  3. Introduction of composite reliability evaluation in power system operation planning; Introducao da confiabilidade composta no planejamento da operacao eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Schilling, M T; Gomes, P [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper gives an overview of an ongoing, detailed and first-hand investigation about the current reliability levels of the Brazilian power system, as seen from the electrical operation planning point-of-view. A set of practical results are presented and commented. (author) 41 refs., 4 figs., 4 tabs.

  4. Development of nuclear power plant management system for Kyushu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Nakamura, Kenichi; Akiyoshi, Tatsuo; Tanimoto, Kazuo; Ogura, Kazuhito; Ibi, Yuji; Kawasaki, Michiyuki

    2002-01-01

    The Kyushu Electric Power Co., Ltd. progresses development of the nuclear power plant management system using IT under aims at upgrading of efficiency, level, and reliability on maintenance and administration business under five years planning since 1999 fiscal year. The outline of the system are explained in this paper. As a result of preparation on power station net work and personal computers set in all of company, an environment capable of using these infrastructures and introducing large scale systems on transverse business over every groups of each power station could be established. (G.K.)

  5. The impact of a large penetration of intermittent sources on the power system operation and planning

    Science.gov (United States)

    Ausin, Juan Carlos

    This research investigated the impact on the power system of a large penetration of intermittent renewable sources, mainly wind and photovoltaic generation. Currently, electrical utilities deal with wind and PV plants as if they were sources of negative demand, that is to say, they have no control over the power output produced. In this way, the grid absorbs all the power fluctuation as if it were coming from a common load. With the level of wind penetration growing so quickly, there is growing concern amongst the utilities and the grid operators, as they will have to deal with a much higher level of fluctuation. In the same way, the potential cost reduction of PV technologies suggests that a similar development may be expected for solar production in the mid term. The first part of the research was focused on the issues that affect utility planning and reinforcement decision making. Although DG is located mainly on the distribution network, a large penetration may alter the flows, not only on the distribution lines, but also on the transmission system and through the transmission - distribution interfaces. The optimal capacity and production costs for the UK transmission network have been calculated for several combinations of load profiles and typical wind/PV output scenarios. A full economic analysis is developed, showing the benefits and disadvantages that a large penetration of these distributed generators may have on transmission system operator reinforcement strategies. Closely related to planning factors are institutional, revelatory, and economic considerations, such as transmission pricing, which may hamper the integration of renewable energy technologies into the electric utility industry. The second part of the research related to the impact of intermittent renewable energy technologies on the second by second, minute by minute, and half-hour by half-hour operations of power systems. If a large integration of these new generators partially replaces the

  6. Danish emergency plan for Barsebaeck Power Plant

    International Nuclear Information System (INIS)

    1981-01-01

    A revised edition of the Danish emergency plan for the Swedish Power Plant Barsebaeck (about 20 km from the Danish Territory) is prepared at the request of Environmental Council in cooperation with police management and civil defense organisations. The plan is valid from October 1981. The emergency plan defines the emergency organization and the provisions to be taken quickly to protect the population if it is exposed to ionizing radiation from release of radioactive effluents as a result of an accident in the Barsebaeck power plant. The emergency plan is based upon Regulation no. 278, June 27, 1963 and Regulation no. 502, October 1, 1974. (EG)

  7. Optimization and Control of Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C. [Univ. of Wisconsin, Madison, WI (United States); Molzahn, Daniel K. [Univ. of Wisconsin, Madison, WI (United States)

    2014-10-17

    The analysis and optimization needs for planning and operation of the electric power system are challenging due to the scale and the form of model representations. The connected network spans the continent and the mathematical models are inherently nonlinear. Traditionally, computational limits have necessitated the use of very simplified models for grid analysis, and this has resulted in either less secure operation, or less efficient operation, or both. The research conducted in this project advances techniques for power system optimization problems that will enhance reliable and efficient operation. The results of this work appear in numerous publications and address different application problems include optimal power flow (OPF), unit commitment, demand response, reliability margins, planning, transmission expansion, as well as general tools and algorithms.

  8. Design study of electrical power supply system for tokamak fusion power reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Design study of the electrical power supply system for a 2000MWt Tokamak-type fusion reactor has been carried out. The purposes are to reveal and study problems in the system, leading to a plan of the research and development. Performed were study of the electrical power supply system and design of superconducting inductive energy storages and power switches. In study of the system, specification and capability of various power supplies for the fusion power reactor and design of the total system with its components were investigated. For the superconducting inductive energy storages, material choice, design calculation, and structural design were conducted, giving the size, weight and performance. For thyristor switches, circuit design in the parallel / series connection of element valves and cooling design were studied, providing the size and weight. (auth.)

  9. TQC works in newly-built nuclear power plant and main electric power system plannings

    International Nuclear Information System (INIS)

    Akiyama, Yoshihisa; Kawakatsu, Tadashi; Hashimoto, Yasuo

    1985-01-01

    In the Kansai Electric Power Co., Inc., TQC has been introduced to solve such major problems in nuclear power generation as the securing of nuclear power reliability, the suppression of rises in the costs, the reduction in long periods of power failure and the promotion in siting of nuclear power plants. It is thus employed as a means of the ''creation of a slim and tough business constitution''. The state of activities in Kansai Electric are described in quality assurance of a newly-built nuclear power plant and in raising the reliability of the main electric power system to distribute the generated nuclear power and further the future prospects are explained. (Mori, K.)

  10. Reliability evaluation of deregulated electric power systems for planning applications

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A.M.; Jafari, A.; Fotuhi-Firuzabad, M.

    2008-01-01

    In a deregulated electric power utility industry in which a competitive electricity market can influence system reliability, market risks cannot be ignored. This paper (1) proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets and (2) develops a methodology for incorporating the market reliability problem into HLII reliability studies. A Markov state space diagram is employed to evaluate the market reliability. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. The key point in the proposed method is the concept that the reliability level of a restructured electric power system can be calculated using the availability of the composite power system (HLII) and the reliability of the electricity market. Two case studies are carried out over Roy Billinton Test System (RBTS) to illustrate interesting features of the proposed methodology

  11. Hybrid power filter for advanced power quality in industrial systems

    Czech Academy of Sciences Publication Activity Database

    Švec, J.; Müller, Z.; Kasembe, A. G.; Tlustý, J.; Valouch, Viktor

    2013-01-01

    Roč. 103, october 2013 (2013), s. 157-167 ISSN 0378-7796 R&D Projects: GA AV ČR IAA200760703 Institutional research plan: CEZ:AV0Z20570509 Institutional support: RVO:61388998 Keywords : hybrid power filter * power quality * industrial system Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 1.595, year: 2013 http://www.sciencedirect.com/science/article/pii/S0378779613001417

  12. Wind Turbine and Wind Power Plant Modelling Aspects for Power System Stability Studies

    DEFF Research Database (Denmark)

    Altin, Müfit; Hansen, Anca Daniela; Göksu, Ömer

    2014-01-01

    Large amount of wind power installations introduce modeling challenges for power system operators at both the planning and operational stages of power systems. Depending on the scope of the study, the modeling details of the wind turbine or the wind power plant are required to be different. A wind...... turbine model which is developed for the short-term voltage stability studies can be inaccurate and sufficient for the frequency stability studies. Accordingly, a complete and detailed wind power plant model for every kind of study is not feasible in terms of the computational time and also...... and wind power plants are reviewed for power system stability studies. Important remarks of the models are presented by means of simulations to emphasize the impact of these modelling details on the power system....

  13. Air quality analysis for the Western Area Power Administration's 2004 Power Marketing Plan Environmental Impact Statement

    International Nuclear Information System (INIS)

    Glantz, C.S.; Dagle, J.E.; Bilyard, G.R.

    1997-01-01

    The Western Area Power Administration (Western) markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of firm power (plus 100 MW of seasonal peaking capacity) from the Central Valley Project (CVP) and other resources. Western's mission is to sell and deliver electricity generated from these resources. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Further, Western's hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by other regulatory agencies. The Sierra Nevada Region proposes to develop a marketing plan that defines the products and services it would offer beyond the year 2004 and the eligibility and allocation criteria for its electric power resources. Because determining levels of long-term firm power resources to be marketed and subsequently entering into contracts for the delivery of related products and services could be a major Federal action with potentially significant impacts to the human environment, the 2004 Power Marketing Plan Environmental Impact Statement (2004 EIS) is being prepared. Decisions made by the Sierra Nevada Region on how and when to supply power to its customers would influence the operation of power plants within the Western Systems Coordinating Council (WSCC). If the resources affected are thermal resources, this could in turn affect the amount, timing, and location of pollutant emissions to the air at locations throughout the western United States. This report has been produced in conjunction with the 2004 EIS to provide a more detailed discussion of the air quality implications of the 2004 power marketing plan

  14. Reliability evaluation of power systems

    CERN Document Server

    Billinton, Roy

    1996-01-01

    The Second Edition of this well-received textbook presents over a decade of new research in power system reliability-while maintaining the general concept, structure, and style of the original volume. This edition features new chapters on the growing areas of Monte Carlo simulation and reliability economics. In addition, chapters cover the latest developments in techniques and their application to real problems. The text also explores the progress occurring in the structure, planning, and operation of real power systems due to changing ownership, regulation, and access. This work serves as a companion volume to Reliability Evaluation of Engineering Systems: Second Edition (1992).

  15. Nuclear power - strategic planning for the next generation

    International Nuclear Information System (INIS)

    Turner, K.H.

    1989-01-01

    Regardless of the real or perceived causes of the nuclear power industry's current difficulties, a number of recent trends-increasing electricity demand, foreign oil dependency, and attention paid to acid rain and the greenhouse effect-taken together, point of the most favorable atmosphere in recent history for nuclear power. Already, serious public discussion of its advantages have begun anew. Thus, the time is ripe to consider the developmental structure of nuclear power's next generation. Although much uncertainty still surrounds the nuclear industry, valuable lessons have been learned, and the evolution of the industry from this point cannot be left to chance. The purpose of this paper is to discuss a framework for nuclear power strategic planning activities. The strategic planning objectives outlined in this paper span issues that affect virtually every aspect of the nuclear power industry. Piecemeal responses to the vagaries of random stimuli will not be adequate. A proactive, integrated, industry-wide initiative-an Institute of Nuclear Power Planning, actively supported by the members of the industry-should be undertaken immediately to fill the strategic planning role. In so doing, the industry will not only be acting in its own best interest but will also be helping the nation realize the real and important benefits of its nuclear power technology

  16. Automation system for operation of nuclear power plant

    International Nuclear Information System (INIS)

    Kinoshita, Mitsuo; Fukuzaki, Koji; Kato, Kanji

    1991-01-01

    The automation system comprises a general monitor control device incorporating a plurality of emergency operation plannings concerning an automatic processing, and judging whether the operation is to be conducted or not depending on the plannings based on the data planed by a plant, a control device for controlling the plant in accordance with the planning when monitor control device judges that the operation should be done due to the emergency operation plannings and an operation planning device aiding the formation of the operation plannings. When the state of the power plant exceeds a normal control region, the reactor power is lowered automatically by so much as a predetermined value or to a predetermined level, to automatically return the plant state to the normal control region. In this way, the plant operation efficiency can be improved. Further, after automatic operation, since operation plannings for recovering original operation plannings are prepared efficiently and recovered operation plannings are started in a short period of time, the operators' burden can be mitigated and power saving can be attained. (N.H.)

  17. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  18. Space Station power system issues

    International Nuclear Information System (INIS)

    Giudici, R.J.

    1985-01-01

    Issues governing the selection of power systems for long-term manned Space Stations intended solely for earth orbital missions are covered briefly, drawing on trade study results from both in-house and contracted studies that have been conducted over nearly two decades. An involvement, from the Program Development Office at MSFC, with current Space Station concepts began in late 1982 with the NASA-wide Systems Definition Working Group and continued throughout 1984 in support of various planning activities. The premise for this discussion is that, within the confines of the current Space Station concept, there is good reason to consider photovoltaic power systems to be a venerable technology option for both the initial 75 kW and 300 kW (or much greater) growth stations. The issue of large physical size required by photovoltaic power systems is presented considering mass, atmospheric drag, launch packaging and power transmission voltage as being possible practicality limitations. The validity of searching for a cross-over point necessitating the introduction of solar thermal or nuclear power system options as enabling technologies is considered with reference to programs ranging from the 4.8 kW Skylab to the 9.5 gW Space Power Satellite

  19. Philippines revises power plans

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, D.

    1988-02-01

    Following an unexpected surge in electricity demand the Philippines has revised its medium term power development programme. The sharp increase in electricity consumption follows three years of slack demand due to civil disturbances before the end of the Macros administration and the election of Corazon Aquino as President in 1986. Originally, the Aquino government's medium term power development plans called for about 500MW of generating capacity to be installed between 1986 and 1992. The three proposed plants were scheduled for commissioning in 1991 and 1992. However, a spurt in power demand growth during the past nine months has caused concern among industrialists that power shortages could occur by the end of the decade. So additional capacity will be installed to prevent an anticipated shortfall in electricity supplies by the early 1990s.

  20. Evolutionary growth for Space Station Freedom electrical power system

    Science.gov (United States)

    Marshall, Matthew Fisk; Mclallin, Kerry; Zernic, Mike

    1989-01-01

    Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

  1. A cooperative power trading system based on satisfaction space technology

    International Nuclear Information System (INIS)

    Matsumoto, K.; Maruo, T.; Mori, N.

    2006-01-01

    This paper proposed a new power trading system model designed to ensure customer cooperation with power suppliers. Designed as an Internet application, the cooperative power trading system modelled power markets using a satisfaction space technology A network model of electric power trading systems was developed to create a communication network system that consisted of suppliers, customers, and auctioneers. When demand exceeded supply, the auctioneer in the trading system requested power reductions from customers. Rewards were paid to maintain the degree of satisfaction of the customers. The supplier's evaluation function was defined as a function of market price and power supply. A power reducing method was developed using a combinatorial optimization technique. Suppliers and customers submitted bids for initial power trading quantities, while the auctioneer decided a market price based on bidding values. After receiving the market price, suppliers and customers submitted a second set of bids for expected power trading quantities. A power reduction plan was then developed by the auctioneer to balance the amount of power supply and demand. The system can be applied to customers whose evaluation functions cannot be estimated beforehand, as the auctioneer was able to choose the most efficient power reduction point selected by consumers using a maximum steep slope method. Simulations conducted to validate the trading system demonstrated that the system is capable of choosing efficient energy reduction plans. 6 refs., 4 tabs., 3 figs

  2. Primary Water Chemistry Control during a Planned Outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, Guoping; Nashiem, Rod; Matheson, Shane; Yabar, Berman; Harper, Bill; Roberts, John G.

    2012-09-01

    Bruce Power has developed a comprehensive outage water chemistry program, which includes both primary and secondary chemistry requirements during planned outages. The purpose of the program is to emphasize the chemistry requirements during outages and subsequent start-ups in order to maintain the integrity of the systems, minimise activity transport and radiation fields, reduce the Carbon-14 release, and to ensure that the requirements are integrated with the outage management program. Prior to a planned outage, Station Chemical Technical Sections identify outage chemistry requirements to Operations and Outage Planning and ensure that work necessary to correct system chemistry issues is within outage work scope. The outage water chemistry program provides direction for establishing alternative sampling locations as demanded by the system configuration during the outage and identifies outage prerequisites for nuclear system purification capabilities. These requirements are contained in an outage checklist. The paper mainly highlights the primary water chemistry issues and chemistry control strategies during planned outages and discusses challenges and successes. (authors)

  3. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  4. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  5. Upgrading Planning and Executive Strategy for Reactor Protection System and Relative Equipment in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jiang Zuyue

    2010-01-01

    Qinshan Nuclear Power Plant (QNPP) is the first nuclear power plant in China which completed the reactor protection system (RPS) upgrading with new digital safety instrumentation and control (I and C) platform instead of original analog system. At the same time,the nuclear instrumentation system (NIS) was upgraded with the same digital I and C platform. For adapting QNPP's actual engineering situation,the upgrading planning was taken by comprehensively investigating current development and application of digital safety I and C platform in the worldwide scope and by reviewing plant's original systems operation history. The project executive strategy-QNPP's leading role with necessary overseas cooperation and internal technical supports as great as possible, was determined. Some significant factors might influence and restrict the RPS and relative equipment upgrading executive actions in an operating NPP were analyzed.Finally, the engineering feasibility was briefly assessed to recognize the anticipated issues and difficulties and to prepare the relative solutions in advance for the purpose of ensuring the RPS upgrading objectives completely realized. (authors)

  6. Expert system for maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ito, Tetsuo; Kasahara, Takayasu; Watanabe, Takao; Matsuki, Tsutomu.

    1989-01-01

    The basic function of the expert system which supports the maintenance works such as the diagnosis of nuclear power plants and the planning of maintenance works was developed. For the maintenance of large scale plants like nuclear power plants, much manpower is required. Consequently, it has been desired to develop the system for improving the maintainability by utilizing the expertise and empirical knowledge of skilled engineers. This system comprises the subsystems for aiding plant diagnosis and maintenance work planning. The former diagnoses the contents of out of order based on the knowledge base, and thereafter, guides the method of taking measures using simulator. The latter establishes the plan by using the method of limiting branching together so that the maintenance works do not interfere mutually or do not affect the operation. Hereafter, it is intended to improve the man-machine condition and expand knowledge aiming at the practical use. The outline of the system, the constitution of subsystems, the example of plant diagnosis, the support of plant maintenance work planning and so on are reported. (K.I.)

  7. Nuclear power as an option in electrical generation planning for Croatia

    International Nuclear Information System (INIS)

    Feretic, D.; Tomsic, Z.; Cavlina, N.; Kovacevic, T.

    2000-01-01

    The expected increase of electricity consumption in the next two decades, if covered mainly by domestic production, will require roughly 4500 MW of new installed capacity. The question is which resource mix would be optimal for the future power plants. Taking into account lack of domestic resources for electricity generation, current trends in the European energy markets, and environmental impact of various energy technologies, it seems reasonable for Croatia to keep the nuclear option open in the future energy planning. In line with that conclusion, this paper analyzes how the introduction of nuclear power plants would influence future power system expansion plans in Croatia, and the possibility to meet the Kyoto requirement. The effects of CO 2 emission tax and external costs on the optimal capacity mix and the emissions levels are also examined. (author)

  8. Advances in electric power and energy systems load and price forecasting

    CERN Document Server

    2017-01-01

    A comprehensive review of state-of-the-art approaches to power systems forecasting from the most respected names in the field, internationally. Advances in Electric Power and Energy Systems is the first book devoted exclusively to a subject of increasing urgency to power systems planning and operations. Written for practicing engineers, researchers, and post-grads concerned with power systems planning and forecasting, this book brings together contributions from many of the world’s foremost names in the field who address a range of critical issues, from forecasting power system load to power system pricing to post-storm service restoration times, river flow forecasting, and more. In a time of ever-increasing energy demands, mounting concerns over the environmental impacts of power generation, and the emergence of new, smart-grid technologies, electricity price forecasting has assumed a prominent role within both the academic and industrial ar nas. Short-run forecasting of electricity prices has become nece...

  9. Power generation in the 12-th five-year plan

    International Nuclear Information System (INIS)

    Troitskij, A.A.

    1986-01-01

    The state of electric power generation in the 11-th five-year plan is summed up. Perspectives of development of heat and electric power generation in the 12-th five-year plan are considered. Thermal power generation of NPPs in 1990 will increase by a factor of 8.4 as compared with 1975. The NPP development will be mainly realized on the basis of the WWER-1000 type reactors. It is planned to commission fast reactors of up to 800 MW

  10. High-power microwave diplexers for advanced ECRH systems

    International Nuclear Information System (INIS)

    Kasparek, W.; Petelin, M.; Erckmann, V.; Bruschi, A.; Noke, F.; Purps, F.; Hollmann, F.; Koshurinov, Y.; Lubyako, L.; Plaum, B.; Wubie, W.

    2009-01-01

    In electron cyclotron resonance heating systems, high-power multiplexers can be employed as power combiners, adjustable power dividers, fast switches to toggle the power between two launchers, as well as frequency sensitive directional couplers to combine heating and diagnostic applications on one launcher. In the paper, various diplexer designs for quasi-optical and corrugated waveguide transmission systems are discussed. Numerical calculations, low-power tests and especially high-power experiments performed at the ECRH system of W7-X are shown, which demonstrate the capability of these devices. Near term plans for applications on ASDEX Upgrade and FTU are presented. Based on the present results, options for implementation of power combiners and fast switches in the ECRH system of ITER is discussed.

  11. Preinspection of nuclear power plant systems

    International Nuclear Information System (INIS)

    1975-01-01

    The general plans of the systems affecting the safety of the nuclear power plants are accepted by the Institute of Radiation Protection (IRP) on the basis of the preinspection of the systems. This is the prerequisite of the preinspection of the structures and components belonging to these systems. Exceptionally, when separately agreed, the IRP may perform the preinspection of a separate structure or component, although the preinspection documentation of the whole system, e.g. the nuclear heat generating system, has not been accepted. This guide applies to the nuclear power plant systems that have been defined to be preinspected in the classification document accepted by the IRP

  12. A fuzzy-stochastic simulation-optimization model for planning electric power systems with considering peak-electricity demand: A case study of Qingdao, China

    International Nuclear Information System (INIS)

    Yu, L.; Li, Y.P.; Huang, G.H.

    2016-01-01

    In this study, a FSSOM (fuzzy-stochastic simulation-optimization model) is developed for planning EPS (electric power systems) with considering peak demand under uncertainty. FSSOM integrates techniques of SVR (support vector regression), Monte Carlo simulation, and FICMP (fractile interval chance-constrained mixed-integer programming). In FSSOM, uncertainties expressed as fuzzy boundary intervals and random variables can be effectively tackled. In addition, SVR coupled Monte Carlo technique is used for predicting the peak-electricity demand. The FSSOM is applied to planning EPS for the City of Qingdao, China. Solutions of electricity generation pattern to satisfy the city's peak demand under different probability levels and p-necessity levels have been generated. Results reveal that the city's electricity supply from renewable energies would be low (only occupying 8.3% of the total electricity generation). Compared with the energy model without considering peak demand, the FSSOM can better guarantee the city's power supply and thus reduce the system failure risk. The findings can help decision makers not only adjust the existing electricity generation/supply pattern but also coordinate the conflict interaction among system cost, energy supply security, pollutant mitigation, as well as constraint-violation risk. - Highlights: • FSSOM (Fuzzy-stochastic simulation-optimization model) is developed for planning EPS. • It can address uncertainties as fuzzy-boundary intervals and random variables. • FSSOM can satisfy peak-electricity demand and optimize power allocation. • Solutions under different probability levels and p-necessity levels are analyzed. • Results create tradeoff among system cost and peak-electricity demand violation risk.

  13. Early environmental planning: A process for power line corridor selection

    International Nuclear Information System (INIS)

    Haagenstad, T.; Bare, C.M.

    1998-01-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory's electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures

  14. Survey on the cost of the photovoltaic power system; Taiyoko hatsuden cost chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Comparisons were made of the power generation cost in Indonesia and Thailand between the photovoltaic power system and other power systems. From the difference in technical standards with Japan, trially calculated were the amount of the potential introduction and the possibly reduced cost. In Indonesia, a plan has started for the introduction of a 50W system to 1 million houses in the unelecrified area, but the introduction has not been so promoted as planned. In Thailand, a plan is being carried out for the introduction of the battery charge station system, but the introduction has remained small-scaled. Comparisons were made among the solar home system in Indonesia, the battery charge station system in Thailand, the diesel engine power generation, and the grid connection with the existing power distribution system. The result concluded that the solar home system is low-priced though it depends on the distance from the existing distribution line and the power consumption amount. Moreover, it was found that the system would be more economical than in the case of Japan if obeying international standards for the photovoltaic power system. 6 refs., 15 figs., 56 tabs.

  15. 77 FR 12086 - Final Staff Guidance, Revision 4 to Standard Review Plan; Section 8.1 on Electric Power-Introduction

    Science.gov (United States)

    2012-02-28

    ... Plan; Section 8.1 on Electric Power--Introduction AGENCY: Nuclear Regulatory Commission. [[Page 12087... Nuclear Power Plants,'' Standard Review Plan (SRP) Section 8.1 on ``Electric Power--Introduction,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113640121), and the Branch...

  16. Interesting tools for the cybersecurity plan of a nuclear power plant; Herramientas de utilidad para el plan de Ciberseguridad de una Planta Nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Pareja, I.; Carrasco, J. A.; Cerro, F. J. del

    2012-07-01

    The use of digital technologies in monitoring and control systems of nuclear power plants and their connectivity requirements, originate cybersecurity difficulties that should be addressed in a cybersecurity plan. This plan should guide the policies and procedures followed during the design maintenance and operation of the systems inside a nuclear power plant. It also should refer to adequate tools able to reach the established cybersecurity requirements. The combination of Datadiodes and tools for publishing video (like tVGA2web), permit an isolation and remote maintenance in a 100% safety way and their use should be disseminated. In the paper other type of tools useful for nuclear power plants are also mentioned.

  17. The planning of areas near nuclear power stations

    International Nuclear Information System (INIS)

    1977-01-01

    During the past five years national physical planning has been initiated by the Swedish Parliament. Guidelines have been given to the communities how to consider national interests when drawing up local planning and how to produce maps and descriptions of the planning. For the planning of the areas near the nuclear power stations the municipalities have certain guidelines from The Nuclear Power Inspectorate and The National Institute of Radiation Protection. It is advised to keep a low population density near the power plants, to avoid the type of harbour or industry which could have disturbing effects on the power plant and also to avoid to concentrate people, who are difficult to move from the area in case of an accident (i.e., homes for old people, maternity homes and prisons). The plants on the East Coast, Forsmark and Oskarshamn, are located in wooded areas with a very low population density. On the West Coast, near Ringhals and Barsebaeck, the population density is higher, and there is one village with about 2,000 inhabitants, situated at a distance of two (2) km from the Ringhals power plant. The Control Boards are now reluctant to concentrate more people in this village, where schools and shops were earlier planned for 3,000 inhabitants. The building activity near power plants is regulated by law. New buildings are prohibited within a distance of two (2) km from the plants. Some exeptions can be granted by the County Administrative Board after guidance from the Central Board. In a zone reaching 10 kilometers from the power plants there are no regulations by law about new buildings, except the earlier mentioned guidelines from the Central Boards to maintain a low population. (L.E.)

  18. Scheduling of Power System Cells Integrating Stochastic Power Generation

    International Nuclear Information System (INIS)

    Costa, L.M.

    2008-12-01

    Energy supply and climate change are nowadays two of the most outstanding problems which societies have to cope with under a context of increasing energy needs. Public awareness of these problems is driving political willingness to take actions for tackling them in a swift and efficient manner. Such actions mainly focus in increasing energy efficiency, in decreasing dependence on fossil fuels, and in reducing greenhouse gas emissions. In this context, power systems are undergoing important changes in the way they are planned and managed. On the one hand, vertically integrated structures are being replaced by market structures in which power systems are un-bundled. On the other, power systems that once relied on large power generation facilities are witnessing the end of these facilities' life-cycle and, consequently, their decommissioning. The role of distributed energy resources such as wind and solar power generators is becoming increasingly important in this context. However, the large-scale integration of such type of generation presents many challenges due, for instance, to the uncertainty associated to the variability of their production. Nevertheless, advanced forecasting tools may be combined with more controllable elements such as energy storage devices, gas turbines, and controllable loads to form systems that aim to reduce the impacts that may be caused by these uncertainties. This thesis addresses the management under market conditions of these types of systems that act like independent societies and which are herewith named power system cells. From the available literature, a unified view of power system scheduling problems is also proposed as a first step for managing sets of power system cells in a multi-cell management framework. Then, methodologies for performing the optimal day-ahead scheduling of single power system cells are proposed, discussed and evaluated under both a deterministic and a stochastic framework that directly integrates the

  19. Strategies for sustainable development of the Polish electric power system

    International Nuclear Information System (INIS)

    Janiczek, R.

    1996-01-01

    The key features of sustainable development of the Polish electric power industry are discussed. Priorities and limitations for changes and power demand forecasts are described. Results of least-cost planning for existing power plants' modernization and generation expansion with environmental impacts are presented. The least-cost strategy is given by the optimal upgrades of older plants until year 2002 and by expansion of gas-fired units. The limited availability of gas after 2010 will lead to the construction of new coal-fired plants. For the next planning process, an integrated resource planning methodology is proposed, which includes dynamic optimization of supply and demand side options. Innovative mechanisms are shown to overcome barriers of development like long-terms contracts and decentralization of the power system planning process. (author)

  20. Operating the Irish power system with increased levels of wind power

    DEFF Research Database (Denmark)

    Tuohy, A.; Denny, E.; Meibom, Peter

    2008-01-01

    This paper summarises some of the main impacts of large amounts of wind power installed in the island of Ireland. Using results from various studies performed on this system, it is shown that wind power will impact on all time frames, from seconds to daily planning of the system operation. Results...... from studies examining operation of the system with up to approximately 40% of electricity provided by wind show that some of the most important aspects to be considered include the type of wind turbine technology, the provision of reserve to accommodate wind forecasting error and the method used...

  1. High power communication satellites power systems study

    Science.gov (United States)

    Josloff, Allan T.; Peterson, Jerry R.

    1995-01-01

    This paper discusses a planned study to evaluate the commercial attractiveness of high power communication satellites and assesses the attributes of both conventional photovoltaic and reactor power systems. These high power satellites can play a vital role in assuring availability of universally accessible, wide bandwidth communications, for high definition TV, super computer networks and other services. Satellites are ideally suited to provide the wide bandwidths and data rates required and are unique in the ability to provide services directly to the users. As new or relocated markets arise, satellites offer a flexibility that conventional distribution services cannot match, and it is no longer necessary to be near population centers to take advantage of the telecommunication revolution. The geopolitical implications of these substantially enhanced communications capabilities can be significant.

  2. Three essays on the effect of wind generation on power system planning and operations

    Science.gov (United States)

    Davis, Clay Duane

    While the benefits of wind generation are well known, some drawbacks are still being understood as wind power is integrated into the power grid at increasing levels. The primary difference between wind generation and other forms of generation is the intermittent, and somewhat unpredictable, aspect of this resource. The somewhat uncontrollable aspect of wind generation makes it important to consider the relationship between this resource and load, and also how the operation of other non-wind generation resources may be affected. The three essays that comprise this dissertation focus on these and other important issues related to wind generation; leading to an improved understanding of how to better plan for and utilize this resource. The first essay addresses the cost of increased levels of installed wind capacity from both a capacity planning and economic dispatch perspective to arrive at the total system cost of installing a unit of wind capacity. This total includes not only the cost of the wind turbine and associated infrastructure, but also the cost impact an additional unit of wind capacity has on the optimal mix and operation of other generating units in the electricity supply portfolio. The results of the model showed that for all wind expansion scenarios, wind capacity is not cost-effective regardless of the level of the wind production tax credit and carbon prices that were considered. Larger levels of installed wind capacity result in reduced variable cost, but this reduction is not able to offset increases in capital cost, as a unit of installed wind capacity does not result in an equal reduction in other non-wind capacity needs. The second essay develops a methodology to better handle unexpected short term fluctuations in wind generation within the existing power system. The methodology developed in this essay leads to lower expected costs by anticipating and planning for fluctuations in wind generation by focusing on key constraints in the system. The

  3. Equipment acquisition plans for the SSCL magnet excitation power system

    International Nuclear Information System (INIS)

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment

  4. Solar central receiver hybrid power system. Phase I study

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-11-01

    A management plan is presented for implementation during the Solar Central Receiver Hybrid Power System - Phase I study project. The project plan and the management controls that will be used to assure technically adequate, timely and cost effective performance of the work required to prepare the designated end products are described. Bechtel in-house controls and those to be used in directing the subcontractors are described. Phase I of the project consists of tradeoff studies, parametric analyses, and engineering studies leading to conceptual definition and evaluation of a commercial hybrid power system that has the potential for supplying economically competitive electric power to a utility grid in the 1985-1990 time frame. The scope also includes the preparation of a development plan for the resolution of technical uncertainties and the preparation of plans and a proposal for Phase II of the program. The technical approach will be based on a central receiver solar energy collection scheme which supplies thermal energy to a combined cycle, generating system, consisting of a gas turbine cycle combined with a steam bottoming cycle by means of a heat recovery steam generator.

  5. An integrated GIS environment enhancing the operation and planning of power utilities

    International Nuclear Information System (INIS)

    Yared, George Antoine

    1996-05-01

    The evolution of electrical power systems was tightly geared by the development of two fields: power engineering, with the advanced technology of physical elements comprising all parts of a power system, and information processing tools to manage the performance of electric power utilities. Compared to power engineering that has gone through tremendous developments, information technology applications for electrical power systems are relatively young. The possible improvements of these applications are in their graphical, mapping an data analysis capabilities. State-of-the art information technology such as Geographic Information Systems provides these facilities. The objective of this thesis is to devise a technique that combines power system software tools with the Geographic Information Systems software to enhance the operation, control and planning of electrical transmission systems. The load flow, voltage control and fault analysis models for the transmission system will be re-engineered in a Geographic Information System environment.The research is generic, special attention is given to its application to the Lebanese electrical power system, which is recovering from an infrastructure devastating war. The research entails integrating power systems analysis and control package, or PSACP developed at the AUB within a Geographic Information Systems environment. This will enhance the power modeling capabilities by the use of powerful thematic mapping, geographic and data analysis and user interface techniques that come with Geographic Information Systems. An overview of the two technologies involved is presented, followed by a detailed description of the integration technique before describing the integrated system. Moving to a higher level, the features of the system are presented, followed by sample applications of the integrated system on the Lebanese electrical power system. The thesis contributes to the research arena by developing a software re

  6. Case study of nuclear power planning

    International Nuclear Information System (INIS)

    Covarrubias, A.J.; Lane, J.A.

    1976-01-01

    An improved version of the computer programme WASP (Wien Automatic System Planning) is described by the example of a case study. The aim of an optimal power plant development within the economic development is reached over several steps the most important parameters of which are explained in detail. To use the method it is necessary to know and to describe the energy and electricity supply situation of the country referred to. The programme development described has proved to be good in use in an international frame. The IAEA offers its help to all prospected customers in their initial period with the programme WASP. (UA) [de

  7. Nuclear power and ratepayer protest: The Washington Public Power Supply System crisis

    International Nuclear Information System (INIS)

    Sugai, W.H.

    1986-01-01

    In early 1982, the Washington Public Power Supply System (WPPSS) terminated two nuclear projects, triggering an episode of mass ratepayer insurgency throughout the state. In this survey of the crisis, the author analyzes the political and economic conditions that precipitated the protest and examines citizen opposition to the WPPSS nuclear venture between 1976 and 1981. The review of the public initiative campaigns aimed at the Northwest utility establishment by local antinuclear forces and the role of key individuals and organizations involved in anti-KPPSS activism are central to the discussion. By emphasizing the organizational dynamics of citizen opposition, the analysis clarifies the influence of antinuclear protest in bringing about the WPPSS crisis, which is still in litigation over disputed financial and management liability claims. Finally, the author offers insights into the implications of the 1980 Pacific Northwest Electric Power Planning and Conservation Act and the role of the new Northwest Power Planning Council in regional electrical energy planning

  8. Development of nuclear power plants database system, (2)

    International Nuclear Information System (INIS)

    Izumi, Fumio; Ichikawa, Michio

    1984-06-01

    A nuclear power plant data base system has been developed. The data base involves a large amount of safety design informations for nuclear power plants on operating and planning stage in Japan. The informations, if necessary, can be searched for at high speed by use of this system. The present report is an user's guide for access to the informations utilizing display unit of the JAERI computer network system. (author)

  9. EHV AC undergrounding electrical power performance and planning

    CERN Document Server

    Benato, Roberto

    2014-01-01

    Analytical methods of cable performance in EHV AC electrical power are discussed in this comprehensive reference. Descriptions of energization, power quality, cable safety constraints and more, guide readers in cable planning and power network operations.

  10. Modeling and analysis of power processing systems: Feasibility investigation and formulation of a methodology

    Science.gov (United States)

    Biess, J. J.; Yu, Y.; Middlebrook, R. D.; Schoenfeld, A. D.

    1974-01-01

    A review is given of future power processing systems planned for the next 20 years, and the state-of-the-art of power processing design modeling and analysis techniques used to optimize power processing systems. A methodology of modeling and analysis of power processing equipment and systems has been formulated to fulfill future tradeoff studies and optimization requirements. Computer techniques were applied to simulate power processor performance and to optimize the design of power processing equipment. A program plan to systematically develop and apply the tools for power processing systems modeling and analysis is presented so that meaningful results can be obtained each year to aid the power processing system engineer and power processing equipment circuit designers in their conceptual and detail design and analysis tasks.

  11. Optimal Siting and Sizing of Energy Storage System for Power Systems with Large-scale Wind Power Integration

    DEFF Research Database (Denmark)

    Zhao, Haoran; Wu, Qiuwei; Huang, Shaojun

    2015-01-01

    This paper proposes algorithms for optimal sitingand sizing of Energy Storage System (ESS) for the operationplanning of power systems with large scale wind power integration.The ESS in this study aims to mitigate the wind powerfluctuations during the interval between two rolling Economic......Dispatches (EDs) in order to maintain generation-load balance.The charging and discharging of ESS is optimized consideringoperation cost of conventional generators, capital cost of ESSand transmission losses. The statistics from simulated systemoperations are then coupled to the planning process to determinethe...

  12. An investigation on the impacts of regulatory interventions on wind power expansion in generation planning

    International Nuclear Information System (INIS)

    Alishahi, Ehsan; Moghaddam, Mohsen P.; Sheikh-El-Eslami, Mohammad K.

    2011-01-01

    Large integration of intermittent wind generation in power system has necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. This paper presents a novel framework on the basis of a combination of stochastic dynamic programming (SDP) algorithm and game theory to study the impacts of different regulatory interventions to promote wind power investment in generation expansion planning. In this study, regulatory policies include Feed-in-Tariff (FIT) incentive, quota and tradable green certificate. The intermittent nature and uncertainties of wind power generation will cause the investors encounter risk in their investment decisions. To overcome this problem, a novel model has been derived to study the regulatory impacts on wind generation expansion planning. In our approach, the probabilistic nature of wind generation is modeled. The model can calculate optimal investment strategies, in which the wind power uncertainty is included. This framework is implemented on a test system to illustrate the working of the proposed approach. The result shows that FITs are the most effective policy to encourage the rapid and sustained deployment of wind power. FITs can significantly reduce the risks of investing in renewable energy technologies and thus create conditions conducive to rapid market growth. - Highlights: → The impacts of regulatory policies to promote wind power investment are investigated. → These policies include Feed-in-Tariff (FIT), quota and tradable green certificate. → Result shows that FIT is an effective policy to motivate the rapid growth of wind power. → In quota, customers are forced to provide the quota decided by regulators from wind.

  13. Planning and development of the Spanish nuclear power programme

    International Nuclear Information System (INIS)

    Lopez-Rodriguez, M.

    1983-01-01

    The paper analyses the Spanish nuclear power programme from its inception to the present time, doing so within the context of the country, characterized by the fairly rapid change from a basically agricultural economy to an economy in which industry and services play an important part and the transformation of which took place mainly during the decade prior to the energy crisis 1973. Reference is made to the early establishment of the Junta de Energia Nuclear (Nuclear Energy Board) (JEN), which was set up as a research body even before nuclear energy became competitive with other sources for the production of electric power and which, by adapting its structure and programmes to the different phases in the development and utilization of nuclear energy in the country, contributed the necessary scientific, technical and legal infrastructure. There is also an analysis of the most striking features of the Spanish energy system and an account of the planning and construction of the first three Spanish nuclear power stations. A further subject of discussion is the energy planning and development projects devised by the Government which gave rise to the second generation of nuclear power plants, some of which are already in operation and the remainder in an advanced state of construction. Emphasis is placed on the action taken by the Spanish Government to increase the participation of Spanish industry in the construction of nuclear power plants and in the supply of equipment and services required for their operation. Reference is made to the experimental changes which have been made in the institutional infrastructure in order to adapt it to the phase of development which has been reached and to the objectives subsequently laid down in the planning: establishment of ENUSA (the national uranium enterprise), the Equipos Nucleares corporation and the Nuclear Safety Council, and also the changes made in the JEN

  14. ANALYSIS OF POWER SYSTEM RELIABILITY IMPROVEMENT FOR 74-BUS RADIAL DISTRIBUTION SYSTEM

    OpenAIRE

    Su Mon Myint*

    2018-01-01

    In Myanmar, electric power system planning is widely constructed because of more and more load growth and facing with failure of electricity, outage problems and system shut-down. Thus, not only making new power system network but also improving reliability of the existing system using suitable methods is very important to provide an adequate supply of electrical energy to its customers as economically and reliably as possible with an acceptable degree of continuity and quality that is design...

  15. Cooperative Control of Active Power Filters in Power Systems without Mutual Communication

    Czech Academy of Sciences Publication Activity Database

    Tlustý, J.; Škramlík, Jiří; Švec, J.; Valouch, Viktor

    2010-01-01

    Roč. 2010, č. 517184 (2010), s. 1-13 ISSN 1024-123X R&D Projects: GA AV ČR IAA200760703 Institutional research plan: CEZ:AV0Z20570509 Keywords : active power filter * power system * wireless cooperation Subject RIV: JA - Electronics ; Optoelectronics, Electric al Engineering Impact factor: 0.689, year: 2010 http://www.hindawi.com/journals/mpe/2010/517184.html

  16. A novel optimal distribution system planning framework implementing distributed generation in a deregulated electricity market

    International Nuclear Information System (INIS)

    Porkar, S.; Poure, P.; Abbaspour-Tehrani-fard, A.; Saadate, S.

    2010-01-01

    This paper introduces a new framework included mathematical model and a new software package interfacing two powerful softwares (MATLAB and GAMS) for obtaining the optimal distributed generation (DG) capacity sizing and sitting investments with capability to simulate large distribution system planning. The proposed optimization model allows minimizing total system planning costs for DG investment, DG operation and maintenance, purchase of power by the distribution companies (DISCOs) from transmission companies (TRANSCOs) and system power losses. The proposed model provides not only the DG size and site but also the new market price as well. Three different cases depending on system conditions and three different scenarios depending on different planning alternatives and electrical market structures, have been considered. They have allowed validating the economical and electrical benefits of introducing DG by solving the distribution system planning problem and by improving power quality of distribution system. DG installation increases the feeders' lifetime by reducing their loading and adds the benefit of using the existing distribution system for further load growth without the need for feeders upgrading. More, by investing in DG, the DISCO can minimize its total planning cost and reduce its customers' bills. (author)

  17. A novel optimal distribution system planning framework implementing distributed generation in a deregulated electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Porkar, S. [Department of Electrical Engineering, Sharif University of Technology, Tehran (Iran); Groupe de Recherches en Electrotechnique et Electronique de Nancy, GREEN-UHP, Universite Henri Poincare de Nancy I, BP 239, 54506 Vandoeuvre les Nancy Cedex (France); Poure, P. [Laboratoire d' Instrumentation Electronique de Nancy, LIEN, EA 3440, Universite Henri Poincare de Nancy I, BP 239, 54506 Vandoeuvre les Nancy Cedex (France); Abbaspour-Tehrani-fard, A. [Department of Electrical Engineering, Sharif University of Technology, Tehran (Iran); Saadate, S. [Groupe de Recherches en Electrotechnique et Electronique de Nancy, GREEN-UHP, Universite Henri Poincare de Nancy I, BP 239, 54506 Vandoeuvre les Nancy Cedex (France)

    2010-07-15

    This paper introduces a new framework included mathematical model and a new software package interfacing two powerful softwares (MATLAB and GAMS) for obtaining the optimal distributed generation (DG) capacity sizing and sitting investments with capability to simulate large distribution system planning. The proposed optimization model allows minimizing total system planning costs for DG investment, DG operation and maintenance, purchase of power by the distribution companies (DISCOs) from transmission companies (TRANSCOs) and system power losses. The proposed model provides not only the DG size and site but also the new market price as well. Three different cases depending on system conditions and three different scenarios depending on different planning alternatives and electrical market structures, have been considered. They have allowed validating the economical and electrical benefits of introducing DG by solving the distribution system planning problem and by improving power quality of distribution system. DG installation increases the feeders' lifetime by reducing their loading and adds the benefit of using the existing distribution system for further load growth without the need for feeders upgrading. More, by investing in DG, the DISCO can minimize its total planning cost and reduce its customers' bills. (author)

  18. Power system analysis of Hanlim superconducting HVDC system using real time digital simulator

    International Nuclear Information System (INIS)

    Won, Y.J.; Kim, J.G.; Kim, A.R.; Kim, G.H.; Park, M.; Yu, I.K.; Sim, K.D.; Cho, J.; Lee, S.; Jeong, K.W.; Watanabe, K.

    2011-01-01

    KEPCO has planned to construct a test site for renewable energy in Jeju power system. One kilometer length of total 8 km was designed as superconducting DC cable. We have developed a simulation model of the 8 km HVDC system using real time digital simulator. The simulation result shows that the HVDC line was not affected by wind power variation. Jeju island is located approximately 100 km south from the mainland of Korea, and had a peak load of about 553 MW in 2008. The demand increases 7.2% a year over the last 5 years. Since the wind profiles of Jeju island are more favorable than mainland of Korea, many companies have shown interest in the wind power business at the Jeju island. Moreover KEPCO has a plan for renewable energy test too whose power will be delivered by HVDC system. One kilometer length of total 8 km was designed as superconducting DC cable. Rest 7 km will be the conventional overhead line. In this paper, the authors have developed a simulation model of the power network around 8 km HVDC system using real time digital simulator (RTDS).

  19. Planning of modern process control systems in processing engineering and power plant engineering. Planung von modernen Prozessleitsystemen in der Verfahrens- und Kraftwerkstechnik

    Energy Technology Data Exchange (ETDEWEB)

    Gilson, W

    1985-01-01

    Correct planning of up-to-date process control systems results in considerable process automation and rationalization. These systems are used in process engineering, in production plants of the chemical industries and in power stations to a growing extent and rapidly reveal their advantages in terms of increased efficiency, improved product quality and reduced maintenance. However, this necessitates to make full and consistent use of the systems' qualities. Lack of experience often result in flows and errors in planning. The VDE und VDI district associations, Frankfurt, selected this subject for this year's discussion in the working group in February/March 1985 in order to provide a comprehensive coverage and demonstration of the field concerned. Experts and interested persons are given information on what facts will have to be observed during all stages in the planning of up-to-date process control systems. The book deals with the following subjects: From the process involved to the structure of the control system; - system specification and system selection; - configuration and project-accompagnying documentation; - trends and prospects exemplified by recent developments.

  20. A landscape simulation system for power plants

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Yoshida, Miki; Usami, Yoshiaki.

    1997-01-01

    As scenes of power plants give many influences to environments, the plants that harmonized with the environments are demanded. We developed a landscape simulation system for the plants by using computer graphics technologies. This system has functions to generate realistic images about plant buildings and environments. Since the system contains information of ridge lines in addition to usual terrain data, the terrain shapes are expressed more precisely. Because the system enables users to visualize plant construction plans, the advance evaluations of plant scenes become possible. We regard this system as useful for environmental assessment of power plants. (author)

  1. Electrical Power System Architectures for In-House NASA/GSFC Missions

    Science.gov (United States)

    Yun, Diane D.

    2006-01-01

    This power point presentation reviews the electrical power system (EPS) architecture used for a few NASA GSFC's missions both current and planned. Included in the presentation are reviews of electric power systems for the Space Technology 5 (ST5) mission, the Solar Dynamics Observatory (SDO) Mission, and the Lunar Reconnaissance Orbiter (LRO). There is a slide that compares the three missions' electrical supply systems.

  2. Program planning for large-scale control system upgrades

    International Nuclear Information System (INIS)

    Madani, M.; Giajnorio, J.; Richard, T.; Ho, D.; Volk, W.; Ertel, A.

    2011-01-01

    Bruce Power has been planning to replace the Bruce A Fuel Handling (FH) computer systems including the Controller and Protective computers for many years. This is a complex project, requiring an extended FH outage. To minimize operational disruption and fully identify associated project risks, Bruce Power is executing the project in phases starting with the Protective Computer replacement. GEH-C is collaborating with Bruce Power in a Preliminary Engineering (PE) phase to generate a project plan including specifications, budgetary cost, schedule, risks for the Protective computer replacement project. To assist Bruce Power in its evaluation, GEH-C's is using 6-Sigma methodologies to identify and rank Critical to Quality (CTQ) requirements in collaboration with Bruce Power Maintenance, Operations, Plant Design and FH Engineering teams. PE phase established the project scope, hardware and software specifications, material requirements and finally concluded with a recommended hardware platform and approved controls architecture.

  3. Optimal control applications in electric power systems

    CERN Document Server

    Christensen, G S; Soliman, S A

    1987-01-01

    Significant advances in the field of optimal control have been made over the past few decades. These advances have been well documented in numerous fine publications, and have motivated a number of innovations in electric power system engineering, but they have not yet been collected in book form. Our purpose in writing this book is to provide a description of some of the applications of optimal control techniques to practical power system problems. The book is designed for advanced undergraduate courses in electric power systems, as well as graduate courses in electrical engineering, applied mathematics, and industrial engineering. It is also intended as a self-study aid for practicing personnel involved in the planning and operation of electric power systems for utilities, manufacturers, and consulting and government regulatory agencies. The book consists of seven chapters. It begins with an introductory chapter that briefly reviews the history of optimal control and its power system applications and also p...

  4. Expert System Applications for the Electric Power Industry: Proceedings

    International Nuclear Information System (INIS)

    1992-06-01

    A conference on Expert System Applications for the Electric Power Industry was held in Boston on September 8--11, 1991 to provide a forum for technology transfer, technical information exchange, and education. The conference was attended by more than 150 representatives of electric utilities, equipment manufacturers, engineering consulting organizations, universities, national laboratories, and government agencies. The meeting included a keynote address, 70 papers, and 18 expert system demonstrations. Sessions covered expert systems in power system planning operations, fossil power plant applications, nuclear power plant applications, and intelligent user interfaces. The presentations showed how expert systems can provide immediate benefits to the electric power industry in many applications. Individual papers are indexed separately

  5. MILP Approach for Bilevel Transmission and Reactive Power Planning Considering Wind Curtailment

    DEFF Research Database (Denmark)

    Ugranli, Faruk; Karatepe, Engin; Nielsen, Arne Hejde

    2017-01-01

    In this study, two important planning problems in power systems that are transmission expansion and reactive power are formulated as a mixed-integer linear programming taking into account the bilevel structure due to the consideration of market clearing under several load-wind scenarios....... The objective of the proposed method is to minimize the installation cost of transmission lines, reactive power sources, and the annual operation costs of conventional generators corresponding to the curtailed wind energy while maintaining the reliable system operation. Lower level problems of the bilevel...... structure are designated for the market clearing which is formulated by using the linearized optimal power flow equations. In order to obtain mixed-integer linear programming formulation, the so-called lower level problems are represented by using primal-dual formulation. By using the proposed method, power...

  6. Experience with the Agency's WASP for nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1986-02-01

    An Advisory Group Meeting to discuss recent experience with, and to suggest improvements to, Wien Automatic System Planning Program (WASP), was held in Vienna in September 1985. It was clear from the meeting that WASP is a very useful tool as an aid in planning electric power generation systems. It is widely used in both developed and developing countries and its use will continue particularly if some of the suggestions for its improvements are implemented. A separate abstract was prepared for each of the 15 presentations of this meeting

  7. Pulsed Power: Sandia's Plans for the New Millenium

    International Nuclear Information System (INIS)

    Quintenz, Jeffrey P.

    2000-01-01

    Pulsed power science and engineering activities at Sandia National Laboratories grew out of a programmatic need for intense radiation sources to advance capabilities in radiographic imaging and to create environments for testing and certifying the hardness of components and systems to radiation in hostile environments. By the early 1970s, scientists in laboratories around the world began utilizing pulsed power drivers with very short (10s of nanoseconds) pulse lengths for Inertial Confinement Fusion (ICF) experiments. In the United States, Defense Programs within the Department of Energy has sponsored this research. Recent progress in pulsed power, specifically fast-pulsed-power-driven z pinches, in creating temperatures relevant to ICF has been remarkable. Worldwide developments in pulsed power technologies and increased applications in both defense and industry are contrasted with ever increasing stress on research and development tiding. The current environment has prompted us at Sandia to evaluate our role in the continued development of pulsed power science and to consider options for the future. This presentation will highlight our recent progress and provide an overview of our plans as we begin the new millennium

  8. Planning and management of outages in nuclear power plants

    International Nuclear Information System (INIS)

    Sica, G.F.; Fusari, W.; Reginelli, A.

    1984-01-01

    At present the Ente Nazionale per l'Energia Elettrica (ENEL) operates three nuclear power plants, only one of which belongs to the new generation, i.e. the Caorso Nuclear Power Plant which has been in commercial operation since December 1981. Outage planning, implementation and analysis are very important in order to minimize the shutdown time and thus improve plant availability, which is of particular importance for a large nuclear power plant. Such activities are very complicated because of the large number of jobs that have to be performed in accordance with detailed written procedures and which have to be properly documented and controlled. Large off-site resources are required which have to be accurately interfaced with on-site staff. The ENEL is making a great effort to define both the administrative and technical aspects of refuelling outages. As outage planning requires the availability and handling of a large amount of data and information, a maintenance information system that has been widely used in conventional plants was applied, with some modifications made especially for the Caorso Nuclear Power Plant. After two years the following results have been achieved: a large number of raw and processed data are now available, the first refuelling outage was carried out with few problems and according to schedule, and the second refuelling outage, based on the experience of the first, required somewhat less preparation and is developing well even though many special activities have had to be scheduled. The ENEL believes that the efforts made in the planning and management areas will pay off in terms of the short duration, smoothness and economy of further outages, both for Caorso and for future plants. (author)

  9. Kilowatt isotope power system phase II plan. Volume II: flight System Conceptual Design (FSCD)

    International Nuclear Information System (INIS)

    1978-03-01

    The Kilowatt Isotope Power System (KIPS) Flight System Conceptual Design (FSCD) is described. Included are a background, a description of the flight system conceptual design, configuration of components, flight system performance, Ground Demonstration System test results, and advanced development tests

  10. Fuzzy possibilistic model for medium-term power generation planning with environmental criteria

    International Nuclear Information System (INIS)

    Muela, E.; Schweickardt, G.; Garces, F.

    2007-01-01

    The aim of this paper is to apply a fuzzy possibilistic model to the power generation planning that includes environmental criteria. Since it is not always meaningful to relate uncertainty to frequency, the proposed approach analyzes the imprecision and ambiguity into the decision making, especially when the system involves human subjectivity. This paper highlights the subjacent differences between fuzzy and possibilistic entities. Additionally, it illustrates the use of fuzzy sets theory and possibility theory for modeling flexibility, and nonprobablistic uncertainty, respectively. The necessity of a new direction for the environmental problem in a power system is outlined, an approach that attempts a greater integral quality of planning instead of searching for a simple optimal solution. This process must be consistent with a wider and more suitable interpretation about both the problem as such and the concept of solution in uncertain situations

  11. Increase of Power System Survivability with the Decision Support Tool CRIPS Based on Network Planning and Simulation Program PSS®SINCAL

    Science.gov (United States)

    Schwaegerl, Christine; Seifert, Olaf; Buschmann, Robert; Dellwing, Hermann; Geretshuber, Stefan; Leick, Claus

    The increased interconnection and automation of critical infrastructures enlarges the complexity of the dependency structures and - as consequence - the danger of cascading effects, e.g. causing area-wide blackouts in power supply networks that are currently after deregulation operated closer to their limits. New tools or an intelligent combination of existing approaches are required to increase the survivability of critical infrastructures. Within the IRRIIS project the expert system CRIPS was developed based on network simulations realised with PSS®SINCAL, an established tool to support the analysis and planning of electrical power, gas, water or heat networks. CRIPS assesses the current situation in power supply networks analysing the simulation results of the physical network behaviour and recommends corresponding decisions.

  12. Development of the power control system for semiconductor lasers

    International Nuclear Information System (INIS)

    Kim, Kwang Suk; Kim, Cheol Jung

    1997-12-01

    For the first year plan of this program, we developed the power control system for semiconductor lasers. We applied the high-current switching mode techniques to fabricating a power control system. Then, we investigated the direct side pumping techniques with GaA1As diode laser bars to laser crystal without pumping optics. We obtained 0.5W average output power from this DPSSL. (author). 54 refs., 3 tabs., 18 figs

  13. Plan of disaster prevention in district of Shizuoka Prefecture countermeasures to nuclear power. 1984 ed.

    International Nuclear Information System (INIS)

    1984-01-01

    Based on the basic act for disaster countermeasures, this plan aimes at establishing the necessary system concerning the countermeasures for preventing the disaster due to the release of a large quantity of radioactive substances from the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., determining the measures to be taken for disaster prevention, and striving for the safety of inhabitants by executing the deskworks and services of the disaster prevention related to nuclear power synthetically and purposefully. The general matters concerning the disaster prevention in the district of Shizuoka Prefecture are determined in the ''Plan of disaster prevention in the district of Shizuoka Prefecture (General countermeasures)'', but in view of the peculiarity of nuclear power disaster, the peculiar matters are to be determined in this plan. The general rules on the works of respective disaster prevention organizations, the countermeasures for preventing nuclear power disaster, the emergency countermeasures to nuclear power disaster, the countermeasures to Tokai earthquakes and the countermeasures for restoration after nuclear power disaster are stipulated. (Kako, I.)

  14. Combined heuristic with fuzzy system to transmission system expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Silva Sousa, Aldir; Asada, Eduardo N. [University of Sao Paulo, Sao Carlos School of Engineering, Department of Electrical Engineering Av. Trabalhador Sao-carlense, 400, 13566-590 Sao Carlos, SP (Brazil)

    2011-01-15

    A heuristic algorithm that employs fuzzy logic is proposed to the power system transmission expansion planning problem. The algorithm is based on the divide to conquer strategy, which is controlled by the fuzzy system. The algorithm provides high quality solutions with the use of fuzzy decision making, which is based on nondeterministic criteria to guide the search. The fuzzy system provides a self-adjusting mechanism that eliminates the manual adjustment of parameters to each system being solved. (author)

  15. Short-Term and Medium-Term Reliability Evaluation for Power Systems With High Penetration of Wind Power

    DEFF Research Database (Denmark)

    Ding, Yi; Singh, Chanan; Goel, Lalit

    2014-01-01

    reliability evaluation techniques for power systems are well developed. These techniques are more focused on steady-state (time-independent) reliability evaluation and have been successfully applied in power system planning and expansion. In the operational phase, however, they may be too rough......The expanding share of the fluctuating and less predictable wind power generation can introduce complexities in power system reliability evaluation and management. This entails a need for the system operator to assess the system status more accurately for securing real-time balancing. The existing...... an approximation of the time-varying behavior of power systems with high penetration of wind power. This paper proposes a time-varying reliability assessment technique. Time-varying reliability models for wind farms, conventional generating units, and rapid start-up generating units are developed and represented...

  16. Integrated multiperiod power generation and transmission expansion planning with sustainability aspects in a stochastic environment

    International Nuclear Information System (INIS)

    Seddighi, Amir Hossein; Ahmadi-Javid, Amir

    2015-01-01

    This paper presents a multistage stochastic programming model to address sustainable power generation and transmission expansion planning. The model incorporates uncertainties about future electricity demand, fuel prices, greenhouse gas emissions, as well as possible disruptions to which the power system is subject. A number of sustainability regulations and policies are considered to establish a framework for the social responsibility of the power system. The proposed model is applied to a real-world case, and several sensitivity analyses are carried out to provide managerial insights into different aspects of the model. The results emphasize the important role played by sustainability policies on the configuration of the power grid. - Highlights: • This paper considers integrated power generation and transmission expansion planning. • Sustainability aspects are incorporated into a multiperiod stochastic setting. • A stochastic mathematical programming model is developed to address the problem. • The model is applied to a real-world case and numerical studies are carried out

  17. An Interval Fuzzy-Stochastic Chance-Constrained Programming Based Energy-Water Nexus Model for Planning Electric Power Systems

    Directory of Open Access Journals (Sweden)

    Jing Liu

    2017-11-01

    Full Text Available In this study, an interval fuzzy-stochastic chance-constrained programming based energy-water nexus (IFSCP-WEN model is developed for planning electric power system (EPS. The IFSCP-WEN model can tackle uncertainties expressed as possibility and probability distributions, as well as interval values. Different credibility (i.e., γ levels and probability (i.e., qi levels are set to reflect relationships among water supply, electricity generation, system cost, and constraint-violation risk. Results reveal that different γ and qi levels can lead to a changed system cost, imported electricity, electricity generation, and water supply. Results also disclose that the study EPS would tend to the transition from coal-dominated into clean energy-dominated. Gas-fired would be the main electric utility to supply electricity at the end of the planning horizon, occupying [28.47, 30.34]% (where 28.47% and 30.34% present the lower bound and the upper bound of interval value, respectively of the total electricity generation. Correspondingly, water allocated to gas-fired would reach the highest, occupying [33.92, 34.72]% of total water supply. Surface water would be the main water source, accounting for more than [40.96, 43.44]% of the total water supply. The ratio of recycled water to total water supply would increase by about [11.37, 14.85]%. Results of the IFSCP-WEN model present its potential for sustainable EPS planning by co-optimizing energy and water resources.

  18. Research and development of photovoltaic power system; Taiyoko hatsuden system no jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Tatsuta, M [New Energy and Industrial Technology Development Organization, Tokyo (Japan)

    1994-12-01

    This paper reports the result obtained during fiscal 1994 on a demonstration research on photovoltaic power generating systems. Solar cells with an output of 750 kW, storage battery facilities with an output of 3,058 kWh, three DC-AC converters with a rating of 250 kW, and a diesel generator with an output of 300 kW having been installed up to the previous fiscal year were combined to perform comprehensive adjustments and tests such as battery charge/discharge tests and AC parallel operation tests. The battery charge/discharge tests revealed that the 10 hour rate discharge capacity meets the specifications, and the batteries are free of deterioration after a demonstration operation of about 4.5 months. Difference between the power generation record and the planned value is thought due to the following reasons: the array output data in a power line connected system come about 90% of the simulation result due to correction coefficient for the solar cell conversion efficiency; the inclined face insolation results in less by about 7% than the planned value, and the transmittable power amount less by about 14% in total; the load power amount is less by about 7% than the planned value; and the balance supplementing power factor increases by about 4%. 5 figs., 2 tabs.

  19. Power system deregulation and the Balkan countries

    International Nuclear Information System (INIS)

    Glamochanin, Vlastimir; Stojkovska, Biljana; Cherepnalkoski, Trajche

    2001-01-01

    The aim of the paper is to show the current state and planned activities of the Power System deregulation and privatization in the following Balkan countries: Macedonia, Romania, Bulgaria, Yugoslavia, Greece, Croatia, Slovenia and Turkey

  20. Power system EMP protection. Final report

    International Nuclear Information System (INIS)

    Marable, J.H.; Barnes, P.R.; Nelson, D.B.

    1975-05-01

    Voltage transients induced in electric power lines and control circuits by the electromagnetic pulse (EMP) from high-altitude nuclear detonations may cause widespread power failure and damage in electric power systems. This report contains a parametric study of EMP power line surges and discusses protective measures to minimize their effects. Since EMP surges have considerably greater rates of rise than lightning surges, recommended standards and test procedures are given to assure that surge arresters protect equipment from damage by EMP. Expected disturbances and damage to power systems are reviewed, and actions are presented which distribution companies can take to counter them. These include backup communications methods, stockpiling of vulnerable parts, repair procedures, and dispatcher actions to prevent blackout from EMP-caused instabilities. A long-range program is presented for improving distributors' protection against EMP. This involves employee training, hardware protection for power and control circuits, and improvement of plans for emergency action. (U.S.)

  1. Power generation planning: a survey from monopoly to competition

    International Nuclear Information System (INIS)

    Kagiannas, A.G.; Askounis, D.T.; Psarras, J.

    2004-01-01

    During the last two decades electric power generation industry in many countries and regions around the world has undergone a significant transformation from being a centrally coordinated monopoly to a deregulated liberalized market. In the majority of those countries, competition has been introduced through the adoption of a competitive wholesale electricity spot market. Short-term efficiency of power generators under competitive environment has attracted considerable effort from researchers, while long-term investment performance has received less attention. In this context, the paper aims to serve as a comprehensive review basis for generation planning methods applied in a competitive electric power generation market. The traditional modeling techniques developed for generation expansion planning under monopoly are initially presented in an effort to assess the evolution of generation planning according to the evolution of the structure of the electric power market. (author)

  2. Assessing the potential role of concentrated solar power (CSP) for the northeast power system of Brazil using a detailed power system model

    International Nuclear Information System (INIS)

    Fichter, Tobias; Soria, Rafael; Szklo, Alexandre; Schaeffer, Roberto; Lucena, Andre F.P.

    2017-01-01

    One of the technologies that stand out as an alternative to provide additional flexibility to power systems with large penetration of variable renewable energy (VRE), especially for regions with high direct normal irradiation (DNI), is concentrated solar power (CSP) plants coupled to thermal energy storage (TES) and back-up (BUS) systems. Brazil can develop this technology domestically, especially in its Northeast region, where most of VRE capacity is being deployed and where lies most of the CSP potential of the country. This work applies the Capacity Expansion Model REMix-CEM, which allows considering dispatch constraints of thermal power plants in long-term capacity expansion optimization. REMix-CEM calculates the optimal CSP plant configuration and its dispatch strategy from a central planning perspective. Results showed that the hybridization of CSP plants with jurema-preta biomass (CSP-BIO) becomes a least-cost option for Brazil by 2040. CSP-BIO contributes to the Northeast power system by regularizing the energy imbalance that results from the large-scale VRE expansion along with conventional inflexible power plants. CSP-BIO plants are able to increase frequency response and operational reserve services and can provide the required additional flexibility that the Northeast power system of Brazil will require into the future. - Highlights: • Concentrating solar power (CSP) plants provide flexibility to power systems. • CSP configuration is optimized endogenously during capacity expansion optimization. • CSP hybridized with biomass supports grid-integration of variable renewable energy. • CSP become the least-cost option for the Northeast power system of Brazil by 2040.

  3. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, M. H.; Giebel, Gregor; Nielsen, T. S.

    2012-01-01

    model to be developed in collaboration with ENFOR A/S; a danish company that specialises in forecasting and optimisation for the energy sector. This integrated prediction model will allow for the description of the expected variability in wind power production in the coming hours to days, accounting......This poster presents the current state of the public service obligation (PSO) funded project PSO 10464, with the working title "Integrated Wind Power Planning Tool". The project commenced October 1, 2011, and the goal is to integrate a numerical weather prediction (NWP) model with purely...

  4. Renewable Energy in Danish Municipalities - an Evaluation of The Planning Framework for Wind Power

    DEFF Research Database (Denmark)

    Sperling, Karl; Hvelplund, Frede; Mathiesen, Brian Vad

    2009-01-01

    Wind power is a maturing technology that in a number of countries is likely to contribute a major share to fully renewable energy systems. Denmark has a comparably long history of wind power development and is planning to continue expanding the existing capacity. If a large-scale penetration of w...

  5. Evaluation of wind power planning in Denmark – Towards an integrated perspective

    DEFF Research Database (Denmark)

    Sperling, Karl; Hvelplund, Frede; Mathiesen, Brian Vad

    2010-01-01

    Wind power is a maturing technology that may form an essential element of fully renewable energy systems in a number of countries. Denmark has a long history of wind power development and is planning to expand its existing capacity. If large-scale penetration of wind power is to be achieved......, an integrated framework is needed that can respond to the associated challenges. This paper argues for adopting an integrated macro perspective when evaluating and building frameworks to support wind power development. This macro perspective is applied to the case of Denmark, and more specifically to concrete...

  6. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  7. Techniques of artificial intelligence applied to the electric power expansion distribution system planning problem; Tecnicas de inteligencia artificial aplicadas ao problema de planejamento da expansao do sistema de distribuicao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Froes, Salete Maria

    1996-07-01

    A tool named Constrained Decision Problem (CDP), which is based on Artificial Intelligence and a specific application to Distribution System Planning is described. The CDP allows multiple objective optimization that does not, necessarily, result in a single optimal solution. First, a literature review covers published works related to Artificial Intelligence applications to Electric Power Distribution Systems, emphasizing feeder restoration and reconfiguration. Some concepts related to Artificial Intelligence are described, with particular attention to Planning and to Constrained Decision Problems. Following, an Electric Power System planning model is addressed by using the CDP tool. Some case studies illustrate the Distribution Planning model, which are compared with standard optimization models. Concluding, some comments establishing the possibilities of CDP applications are followed by a view on future developments. (author)

  8. A physical review on power system reliability factors

    International Nuclear Information System (INIS)

    Navid, Taghizadegan; Ahmad Reza, Zentabchi; Mohammad Ali, Tavakoli; Nader, Samsunchi; Mohammad Ali, Tavakoli

    2005-01-01

    Full text : Planning and design engineers and management must necessarily take into consideration the funds available, the requirements of regulatory agencies and other restrictions that may be imposed, as well as availability of equipment and supplies. A well-designed electrical power system strikes a reasonable between reliability and cost. A prime responsibility of power system operators is to operate their systems in such a way that will provide the maximum reliability of service possible with the facilities under their control

  9. The BPX electrical power system

    International Nuclear Information System (INIS)

    Huttar, D.; Bronnev, G.; Fromm, N.

    1992-01-01

    This paper reports on the Burning Plasma Experiment (BPX) which when operating at a toroidal field of 8.1 tesla and a plasma current of 10.6 megamps, requires peak power of 1235 megawatts and total pulse energy of over 21 gigajoules. These requirements are twice and over four times the corresponding figures for the Tokamak Fusion Test Reactor (TFTR), respectively. The design of the BPX power system has evolved, along with the tokamak, over a period of several years and has included studies of several alternative approaches. The reapplication of the existing TFTR power and energy facilities has been basic to all approaches. Among the new sources of pulse power and energy that have been considered are: direct utility grid pulsing, new flywheel units, and lead-acid storage batteries. The toroidal field power requirements are the greatest of the BPX subsystems and, fortunately, are sufficiently free of dynamics to allow the consideration of all approaches. Additional design challenges were presented by the multiplicity of plasma control scenarios incorporated in the BPX physics planning and the power response demanded of the plasma position control system

  10. Dynamic vulnerability assessment and intelligent control for sustainable power systems

    CERN Document Server

    Gonzalez-Longatt, Francisco

    2018-01-01

    Identifying, assessing, and mitigating electric power grid vulnerabilities is a growing focus in short-term operational planning of power systems. Through illustrated application, this important guide surveys state-of-the-art methodologies for the assessment and enhancement of power system security in short-term operational planning and real-time operation. The methodologies employ advanced methods from probabilistic theory, data mining, artificial intelligence, and optimization, to provide knowledge-based support for monitoring, control (preventive and corrective), and decision making tasks. Key features: Introduces behavioural recognition in wide-area monitoring and security constrained optimal power flow for intelligent control and protection and optimal grid management. Provides in-depth understanding of risk-based reliability and security assessment, dynamic vulnerability as essment methods, supported by the underpinning mathematics. Develops expertise in mitigation techniques using intelligent protect...

  11. Conceptual definition of a technology development mission for advanced solar dynamic power systems

    Science.gov (United States)

    Migra, R. P.

    1986-01-01

    An initial conceptual definition of a technology development mission for advanced solar dynamic power systems is provided, utilizing a space station to provide a dedicated test facility. The advanced power systems considered included Brayton, Stirling, and liquid metal Rankine systems operating in the temperature range of 1040 to 1400 K. The critical technologies for advanced systems were identified by reviewing the current state of the art of solar dynamic power systems. The experimental requirements were determined by planning a system test of a 20 kWe solar dynamic power system on the space station test facility. These requirements were documented via the Mission Requirements Working Group (MRWG) and Technology Development Advocacy Group (TDAG) forms. Various concepts or considerations of advanced concepts are discussed. A preliminary evolutionary plan for this technology development mission was prepared.

  12. Some special problems during the planning and construction of the Paks nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Szilagyi, G.; Szalai, G.; Ferenczy, G.; Sarkoezy, E.; Daniel, G. (Eroemue es Halozattervezoe Vallalat, Eroeterv, Budapest (Hungary))

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned.

  13. Mars power system concept definition study. Volume 2: Appendices

    Science.gov (United States)

    Littman, Franklin D.

    1994-01-01

    This report documents the work performed by Rockwell International's Rocketdyne Division on NASA Contract No. NAS3-25808 (Task Order No. 16) entitled 'Mars Power System Definition Study'. This work was performed for NASA's Lewis Research Center (LeRC). The report is divided into two volumes as follows: Volume 1 - Study Results; and Volume 2 - Appendices. The results of the power system characterization studies, operations studies, and technology evaluations are summarized in Volume 1. The appendices include complete, standalone technology development plans for each candidate power system that was investigated.

  14. Mars power system concept definition study. Volume 1: Study results

    Science.gov (United States)

    Littman, Franklin D.

    1994-01-01

    A preliminary top level study was completed to define power system concepts applicable to Mars surface applications. This effort included definition of power system requirements and selection of power systems with the potential for high commonality. These power systems included dynamic isotope, Proton Exchange Membrane (PEM) regenerative fuel cell, sodium sulfur battery, photovoltaic, and reactor concepts. Design influencing factors were identified. Characterization studies were then done for each concept to determine system performance, size/volume, and mass. Operations studies were done to determine emplacement/deployment maintenance/servicing, and startup/shutdown requirements. Technology development roadmaps were written for each candidate power system (included in Volume 2). Example power system architectures were defined and compared on a mass basis. The dynamic isotope power system and nuclear reactor power system architectures had significantly lower total masses than the photovoltaic system architectures. Integrated development and deployment time phasing plans were completed for an example DIPS and reactor architecture option to determine the development strategies required to meet the mission scenario requirements.

  15. Seismic design practices for power systems

    International Nuclear Information System (INIS)

    Schiff, A.J.

    1991-01-01

    In this paper, the evolution of seismic design practices in electric power systems is reviewed. In California the evolution had led to many installation practices that are directed at improving the seismic ruggedness of power system facilities, particularly high voltage substation equipment. The primary means for substantiating the seismic ruggedness of important, hard to analyze substation equipment is through vibration testing. Current activities include system evaluations, development of emergency response plans and their exercise, and review elements that impact the entire system, such as energy control centers and communication systems. From a national perspective there is a need to standardize seismic specifications, identify a seismic specialist within each utility and enhance communications among these specialists. There is a general need to incorporate good seismic design practices on a national basis emphasizing new construction

  16. Integrated planning of electric vehicles routing and charging stations location considering transportation networks and power distribution systems

    Directory of Open Access Journals (Sweden)

    Andrés Arias

    2018-09-01

    Full Text Available Electric Vehicles (EVs represent a significant option that contributes to improve the mobility and reduce the pollution, leaving a future expectation in the merchandise transportation sector, which has been demonstrated with pilot projects of companies operating EVs for products delivering. In this work a new approach of EVs for merchandise transportation considering the location of Electric Vehicle Charging Stations (EVCSs and the impact on the Power Distribution System (PDS is addressed. This integrated planning is formulated through a mixed integer non-linear mathematical model. Test systems of different sizes are designed to evaluate the model performance, considering the transportation network and PDS. The results show a trade-off between EVs routing, PDS energy losses and EVCSs location.

  17. Energy and nuclear power planning studies

    International Nuclear Information System (INIS)

    Bennett, L.L.; Molina, P.E.; Mueller, T.

    1990-01-01

    The article focuses on the procedures established by the IAEA for providing assistance to international Member States in conducting studies for the analysis of the economic viability of a nuclear power programme. This article specifically reviews energy and nuclear power planning (ENPP) studies in Algeria, Jordan, and Thailand. It highlights major accomplishments in the context of study objectives and organizations, and the principal lessons learned in the process. 4 figs, 1 tab

  18. Oncentra brachytherapy planning system.

    Science.gov (United States)

    Yang, Jack

    2018-03-27

    In modern cancer management, treatment planning has progressed as a contemporary tool with all the advances in computing power in recent years. One of the advanced planning tools uses 3-dimensional (3D) data sets for accurate dose distributions in patient prescription. Among these planning processes, brachytherapy has been a very important part of a successful cancer management program, offering clinical benefits with specific or combined treatments with external beam therapy. In this chapter, we mainly discussed the Elekta Oncentra planning system, which is the main treatment planning tool for high-dose rate (HDR) modality in our facility and in many other facilities in the United States. HDR is a technically advanced form of brachytherapy; a high-intensity radiation source (3.6 mm in length) is delivered with step motor in submillimeter precision under computer guidance directly into the tumor areas while minimizing injury to surrounding normal healthy tissue. Oncentra planning is the key component to generate a deliverable brachytherapy procedure, which is executed on the microSelectron V3 remote afterloader treatment system. Creating a highly conformal plan can be a time-consuming task. The development of Oncentra software (version 4.5.3) offers a variety of useful tools that facilitate many of the clinical challenging tasks for planning, such as contouring and image reconstruction, as well as rapid planning calculations with dose and dose volume histogram analysis. Oncentra Brachy module creates workflow and optimizes the planning accuracy for wide varieties of clinical HDR treatments, such as skin, gynecologic (GYN), breast, prostate, and many other applications. The treatment file can also be transferred to the afterloader control station for speedy delivery. The design concept, calculation algorithms, and optimization modules presented some key characteristics to plan and treat the patients effectively and accurately. The dose distribution and accuracy of

  19. Use of expert systems in nuclear power plants

    International Nuclear Information System (INIS)

    Uhrig, R.E.

    1989-01-01

    The application of technologies, particularly expert systems, to the control room activities in a nuclear power plant has the potential to reduce operator error and increase plant safety, reliability, and efficiency. Furthermore, there are a large number of nonoperating activities (testing, routine maintenance, outage planning, equipment diagnostics, and fuel management) in which expert systems can increase the efficiency and effectiveness of overall plant and corporate operations. This document presents a number of potential applications of expert systems in the nuclear power field. 36 refs., 2 tabs

  20. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, M. H.; Hahmann, Andrea N.; Nielsen, T. S.

    This poster describes the status as of April 2012 of the Public Service Obligation (PSO) funded project PSO 10464 \\Integrated Wind Power Planning Tool". The project goal is to integrate a meso scale numerical weather prediction (NWP) model with a statistical tool in order to better predict short...... term power variation from off shore wind farms, as well as to conduct forecast error assessment studies in preparation for later implementation of such a feature in an existing simulation model. The addition of a forecast error estimation feature will further increase the value of this tool, as it...

  1. Power System Simulation for Policymaking and Making Policymakers

    Science.gov (United States)

    Cohen, Michael Ari

    Power system simulation is a vital tool for anticipating, planning for and ultimately addressing future conditions on the power grid, especially in light of contemporary shifts in power generation, transmission and use that are being driven by a desire to utilize more environmentally responsible energy sources. This dissertation leverages power system simulation and engineering-economic analysis to provide initial answers to one open question about future power systems: how will high penetrations of distributed (rooftop) solar power affect the physical and economic operation of distribution feeders? We find that the overall impacts of distributed solar power (both positive and negative) on the feeders we modeled are minor compared to the overall cost of energy, but that there is on average a small net benefit provided by distributed generation. We then describe an effort to make similar analyses more accessible to a non-engineering (high school) audience by developing an educational video game called "Griddle" that is based on the same power system simulation techniques used in the first study. We describe the design and evaluation of Griddle and find that it demonstrates potential to provide students with insights about key power system learning objectives.

  2. Hydropower planning coordinated with wind power in areas with congestion problems for trading on the spot and the regulating market

    International Nuclear Information System (INIS)

    Matevosyan, Julija; Olsson, Magnus; Soeder, Lennart

    2009-01-01

    In this paper a day-ahead planning algorithm for a multi-reservoir hydropower system coordinated with wind power is developed. Coordination applies to real situations, where wind power and hydropower are owned by different utilities, sharing the same transmission lines, though hydropower has priority for transmission capacity. Coordination is thus necessary to minimize wind energy curtailments during congestion situations. The planning algorithm accounts for the uncertainty of wind power forecasts and power market price uncertainty. Planning for the spot market and the regulating market is considered in the algorithm. The planning algorithm is applied to a case study and the results are summarized in the paper. (author)

  3. Economics of satellite solar power system operation

    Energy Technology Data Exchange (ETDEWEB)

    Collins, P.Q.; Tomkins, R.

    1981-01-01

    The potential value of the Satellite Power System (SPS) concept depends partly on the effects of integrating SPS power into a national supply grid. Some of these effects are evaluated. The factors that would affect utilities appraisal of the system are briefly reviewed. The cost implications of these factors are considered under the headings Load factors, Reliability, System Planning and Integration, and Rectenna Siting and Transmission, with particular reference to the UK and W Europe. A method is proposed for studying the ground segment of the system; a utility could calculate the value it would place on microwave 'fuel' supplied by the space segment, thereby providing firm cost targets for this part of the system. 21 refs.

  4. Program plan for the Brayton Isotope Power System. Phase I. Design, fabrication and test of the Brayton Isotope Power System

    International Nuclear Information System (INIS)

    1975-01-01

    Phase I of an overall program for the development of a 500 to 2000 W(e) (EOM), 7-y life, power system for space vehicles is discussed. The system uses a closed Brayton dynamic system to convert energy from an isotope heat source at a net efficiency greater than 25 percent. This first phase, a 35-month effort, is for the conceptual design of a 1300 W(e), 450 lb flight system and the design, fabrication, and test of a ground demonstration system. The flight system will use, for the baseline design, two of the multihundred-watt (MHW) heat sources being developed. The Ground Demonstration System will simulate, as closely as possible, the Brayton Isotope Power Flight System and will utilize components and technology being developed for the Mini-Brayton rotating unit, recuperator and heat source assembly, respectively. The Ground Demonstration System includes a performance test and a 1000-h endurance test

  5. A two-stage optimal planning and design method for combined cooling, heat and power microgrid system

    International Nuclear Information System (INIS)

    Guo, Li; Liu, Wenjian; Cai, Jiejin; Hong, Bowen; Wang, Chengshan

    2013-01-01

    Highlights: • A two-stage optimal method is presented for CCHP microgrid system. • Economic and environmental performance are considered as assessment indicators. • Application case demonstrates its good economic and environmental performance. - Abstract: In this paper, a two-stage optimal planning and design method for combined cooling, heat and power (CCHP) microgrid system was presented. The optimal objective was to simultaneously minimize the total net present cost and carbon dioxide emission in life circle. On the first stage, multi-objective genetic algorithm based on non-dominated sorting genetic algorithm-II (NSGA-II) was applied to solve the optimal design problem including the optimization of equipment type and capacity. On the second stage, mixed-integer linear programming (MILP) algorithm was used to solve the optimal dispatch problem. The approach was applied to a typical CCHP microgrid system in a hospital as a case study, and the effectiveness of the proposed method was verified

  6. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  7. Report on demonstrative research on photovoltaic power generation system in Myanmar

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of installation and demonstrative operation in Myanmar of a power generation system combining a small-scale photovoltaic power generation system, a wind power generation system, and a diesel generator, research and development is being made under a six year plan starting in 1999 and ending in 2004. Comparative discussions were given on the installation location of the power generation system for the climatic conditions in Chaungthar and Letkhokekone, whereas the final decision was given on Chaungthar. This project plans installation of a photovoltaic power generation system of 80 kW, a wind power generation system of 40 kW, and a diesel generator of 60 kW. Power generation will start at 6 o'clock in the morning and continue to 11 o'clock at night every day, with a storage battery of 1,000 Ah and a stabilized load comprising of ice maker units to be installed. Observation of wind power and solar insolation is being continued with an aim of acquiring data over a period of one year or longer, whereas the data as have been forecasted are being acquired at the present. The diesel generator was manufactured in Japan, which has been arrived at the port of Yangon in February 2001, and installed at the site in Chaungthar in March. (NEDO)

  8. Some special problems during the planning and construction of the Paks nuclear power station

    International Nuclear Information System (INIS)

    Szilagyi, Gyula; Szalai, Geza; Ferenczy, Gabor; Sarkoezy, Endre; Daniel, Gabor

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned. (R.P.)

  9. New Markets for Solar Photovoltaic Power Systems

    Science.gov (United States)

    Thomas, Chacko; Jennings, Philip; Singh, Dilawar

    2007-10-01

    Over the past five years solar photovoltaic (PV) power supply systems have matured and are now being deployed on a much larger scale. The traditional small-scale remote area power supply systems are still important and village electrification is also a large and growing market but large scale, grid-connected systems and building integrated systems are now being deployed in many countries. This growth has been aided by imaginative government policies in several countries and the overall result is a growth rate of over 40% per annum in the sales of PV systems. Optimistic forecasts are being made about the future of PV power as a major source of sustainable energy. Plans are now being formulated by the IEA for very large-scale PV installations of more than 100 MW peak output. The Australian Government has announced a subsidy for a large solar photovoltaic power station of 154 MW in Victoria, based on the concentrator technology developed in Australia. In Western Australia a proposal has been submitted to the State Government for a 2 MW photovoltaic power system to provide fringe of grid support at Perenjori. This paper outlines the technologies, designs, management and policies that underpin these exciting developments in solar PV power.

  10. Development of a decommissioning plan for nuclear power plant 'Krsko'

    International Nuclear Information System (INIS)

    Tankosic, Djurica; Fink, Kresimir

    1991-01-01

    Nuclear Power Plant 'Krsko' (NEK), is the only nuclear power plant in Yugoslavia, is a two-loop, Westinghouse-design, pressurized water reactor rated at 632 MWe. When NEK applied for an operating license in 1981, it did not have to explain how the plant would be decommissioned and decommissioning provisions were not part of the licensing process. Faced with mounting opposition to nuclear power and a real threat that the plant would be shut down, the plant management developed a Mission Plan for resolving the decommissioning problem. The Mission Plan calls for a preliminary decommissioning plan to be prepared and submitted to the local regulatory body before the end of 1992

  11. Planning and preparedness for radiological emergencies at nuclear power stations

    International Nuclear Information System (INIS)

    Thomson, R.; Muzzarelli, J.

    1996-01-01

    The Radiological Emergency Preparedness (REP) Program was created after the March 1979 accident at the Three Mile Island nuclear power station. The Federal Emergency Management Agency (FEMA) assists state and local governments in reviewing and evaluating state and local REP plans and preparedness for accidents at nuclear power plants, in partnership with the US Nuclear Regulatory Commission (NRC), which evaluates safety and emergency preparedness at the power stations themselves. Argonne National Laboratory provides support and technical assistance to FEMA in evaluating nuclear power plant emergency response exercises, radiological emergency plans, and preparedness

  12. Plans for improvements to the ATF ECH system

    International Nuclear Information System (INIS)

    Bigelow, T.S.; Goldfinger, R.C.; Murakami, M.; Schaich, C.R.; Wilgen, J.B.

    1993-01-01

    The Advanced Toroidal Facility (ATF) stellarator experiment at Oak Ridge National Laboratory (ORNL) uses electron cyclotron waves for plasma formation and heating. Although the existing systems are quite reliable and produce acceptable plasmas, a few deficiencies should be corrected. Therefore, several possible upgrades to the electron cyclotron heating (ECH) systems have been planned. Some of the desirable changes are (1) improving the launcher to make power deposition in the plasma more centralized, (2) improving the gyrotron power waveform monitoring diagnostics, (3) building a high-field launch system for higher density operation at 53-GHz (4) building a separate transmission line for the 35-GHz gyrotron, and (5) installing a higher frequency, higher power (84- or 110-GHz) gyrotron system for improved plasma density and temperature capability. This paper discusses options for these improvements and conceptual designs. (orig.)

  13. Stochastic reactive power dispatch in hybrid power system with intermittent wind power generation

    International Nuclear Information System (INIS)

    Taghavi, Reza; Seifi, Ali Reza; Samet, Haidar

    2015-01-01

    Environmental concerns besides fuel costs are the predominant reasons for unprecedented escalating integration of wind turbine on power systems. Operation and planning of power systems are affected by this type of energy due to the intermittent nature of wind speed inputs with high uncertainty in the optimization output variables. Consequently, in order to model this high inherent uncertainty, a PRPO (probabilistic reactive power optimization) framework should be devised. Although MC (Monte-Carlo) techniques can solve the PRPO with high precision, PEMs (point estimate methods) can preserve the accuracy to attain reasonable results when diminishing the computational effort. Also, this paper introduces a methodology for optimally dispatching the reactive power in the transmission system, while minimizing the active power losses. The optimization problem is formulated as a LFP (linear fuzzy programing). The core of the problem lay on generation of 2m + 1 point estimates for solving PRPO, where n is the number of input stochastic variables. The proposed methodology is investigated using the IEEE-14 bus test system equipped with HVDC (high voltage direct current), UPFC (unified power flow controller) and DFIG (doubly fed induction generator) devices. The accuracy of the method is demonstrated in the case study. - Highlights: • This paper uses stochastic loads in optimization process. • AC–DC load flow is modified to use some advantages of DC part in optimization process. • UPFC and DFIG are simulated in a way that could be effective in optimization process. • Fuzzy set has been used as an uncertainty analysis tool in the optimization

  14. Method for assessing wind power integration in a hydro based power system

    International Nuclear Information System (INIS)

    Norheim, I.; Palsson, M.; Tande, J.O.G.; Uhlen, K.

    2006-01-01

    The present paper demonstrates a method for assessment of how much wind power that can be integrated in a system with limited transmission capacity. Based on hydro inflow data and wind measurements (for different locations of planned wind farms in an area) it is possible to assess how much wind power that can be fed into a certain point in the transmission network without violating the transmission capacity limits. The proposed method combines the use of market modelling and detailed network analysis in order to assess the probability of network congestions rather than focusing on extreme cases. By computing the probability distribution of power flow on critical corridors in the grid it is possible to assess the likelihood of network congestions and the amount of energy that must be curtailed to fulfil power system security requirements (n-1). This way the assessment is not only made of worst case scenarios, assuming maximal flow from hydro plants and maximal wind power production. As extreme case scenarios are short term and may be solved by market mechanisms or automatic system protection schemes (disconnection of wind power or hydro power), the proposed method may reveal that it would be economic to install more wind power than if only based on analysis of worst case scenarios. (orig.)

  15. Green power: A renewable energy resources marketing plan

    International Nuclear Information System (INIS)

    Barr, R.C.

    1997-01-01

    Green power is electricity generated from renewable energy sources such as power generated from the sun, the wind, the heat of the earth, and biomass. Green pricing is the marketing strategy to sell green power to customers who voluntarily pay a premium for it. Green pricing is evolving from the deregulation of the electric industry, the need for clean air, reflected in part as concern over global warming, and technology advances. The goal of the renewable energy marketing plan is to generate enough revenues for a utility to fund power purchase agreements (PPAs) with renewable energy developers or construct its own renewable facilities. Long-term, fixed price PPAs enable developers to obtain financing to construct new facilities, sometimes taking technological risks which a utility might not take otherwise. The marketing plan is built around different rate premiums for different categories of ratepayers, volunteer customer participation, customer participation recognition, and budget allocations between project costs and power marketing costs. Green prices are higher than those for conventional sources, particularly prices from natural gas fired plants. Natural gas is abundant relative to oil in price per British thermal unit (Btu). Green pricing can help bridge the gap between the current oversupply of gas and the time, not far off, when all petroleum prices will exceed those for renewable energy. The rapid implementation of green pricing is important. New marketing programs will bolster the growing demand for renewable energy evidenced in many national surveys thus decreasing the consumption of power now generated by burning hydrocarbons. This paper sets forth a framework to implement a green power marketing plan for renewable energy developers and utilities working together

  16. Advanced solutions in power systems HVDC, facts, and artificial intelligence

    CERN Document Server

    Liu, Chen-Ching; Edris, Abdel-Aty

    2016-01-01

    Provides insight on both classical means and new trends in the application of power electronic and artificial intelligence techniques in power system operation and control This book presents advanced solutions for power system controllability improvement, transmission capability enhancement and operation planning. The book is organized into three parts. The first part describes the CSC-HVDC and VSC-HVDC technologies, the second part presents the FACTS devices, and the third part refers to the artificial intelligence techniques. All technologies and tools approached in this book are essential for power system development to comply with the smart grid requirements.

  17. On integration of plug-in hybrid electric vehicles into existing power system structures

    International Nuclear Information System (INIS)

    Galus, Matthias D.; Zima, Marek; Andersson, Goeran

    2010-01-01

    Plug-in hybrid electric vehicles (PHEVs) represent one option for the electrification of private mobility. In order to efficiently integrate PHEVs into power systems, existing organizational structures need to be considered. Based on procedures of power systems planning and operation, actors are identified whose operational activities will be affected by PHEV integration. Potential changes and challenges in the actors' long- and short term planning activities are discussed. Further, a PHEV operation state description is developed which defines vehicle operation states from the power system point of view integrating uncontrolled, controlled recharging and vehicle to grid (V2G) utilization in one single framework. Future PHEV managing entities, such as aggregators, can use this framework for planning and operation activities including load management and V2G. This operational state description could provide a solution for future short term planning challenges of PHEVs and an aegis for various routes of current research, which to date have been weakly linked to each other.

  18. Optimizing power system investments and resilience against attacks

    International Nuclear Information System (INIS)

    Fang, Yiping; Sansavini, Giovanni

    2017-01-01

    This paper studies the combination of capacity expansion and switch installation in electric systems that ensures optimum performance under nominal operations and attacks. The planner–attacker–defender model is adopted to develop decisions that minimize investment and operating costs, and functionality loss after attacks. The model bridges long-term system planning for transmission expansion and short-term switching operations in reaction to attacks. The mixed-integer optimization is solved by decomposition via two-layer cutting plane algorithm. Numerical results on an IEEE system shows that small investments in transmission line switching enhance resilience by responding to disruptions via system reconfiguration. Sensitivity analyses show that transmission planning under the assumption of small-scale attacks provides the most robust strategy, i.e. the minimum-regret planning, if many constraints and limited investment budget affect the planning. On the other hand, the assumption of large-scale attacks provides the most robust strategy if the planning process involves large flexibility and budget. - Highlights: • Investment optimization in power systems under attacks is presented. • Capacity expansion and switch installation for system reconfiguration are combined. • The problem is solved by decomposition via two-layer cutting plane algorithm. • Small investments in switch installation enhance resilience by response to attacks. • Sensitivity analyses identify robust planning against different attack scenarios.

  19. Progress and plans for the EnCurrent power generation system

    Energy Technology Data Exchange (ETDEWEB)

    Bear, C. [New Energy Corp. Inc., Calgary, AB (Canada)

    2008-07-01

    This presentation discussed a new vertical axis hydro turbine designed by New Energy Corporation. The EnCurrent turbine design was based on the Darrieus wind turbine, and suited for use in rivers, irrigation canals, industrial outflows, and tidal current applications. The turbine has a flexible deployment configuration with a variable aspect ratio. Designs for the turbine were initiated in fresh water applications, and the size of the equipment was increased to include tidal applications and large river arrays after the technology was proven. A study has demonstrated that use of the turbines in Canada's canal systems would result in significant annual power generation revenues. The use of smaller turbine systems can provide indirect sales to owners through local resellers, while larger systems can provide power or additional revenues for utilities, large cooperatives, and project developers. Case studies of small turbine installations were provided, as well as case studies of turbines used by larger commercial plants. The presentation also discussed several large projects recently undertaken by the company, including the $6.5 million Canoe pass installation. tabs., figs.

  20. Mechanisms of power in participatory rural planning

    DEFF Research Database (Denmark)

    Johansen, Pia Heike; Chandler, Thomas Lund

    2015-01-01

    that in such an assessment of power it is needed also to drawn in the social context because different social contexts will be more or less vulnerable to different mechanisms of power. The paper takes the stand the rural settings are especially vulnerable to dis-engagement of local citizens, sub-ordination of the rural...... by the urban privilege to define the rural qualities and creation of local conflicts and that mechanisms of power that cause such unintended outcomes of rural planning projects should be uncovered. Inspired by Foucault's interpretation of power the paper carries out a grounded theory inspired analysis...

  1. Transmit Power Minimization and Base Station Planning for High-Speed Trains with Multiple Moving Relays in OFDMA Systems

    KAUST Repository

    Ghazzai, Hakim

    2016-03-15

    High-speed railway system equipped with moving relay stations placed on the middle of the ceiling of each train wagon is investigated. The users inside the train are served in two hops via the orthogonal frequency-division multiple access (OFDMA) technology. In this work, we first focus on minimizing the total downlink power consumption of the base station (BS) and the moving relays while respecting specific quality of service (QoS) constraints. We first derive the optimal resource allocation solution in terms of OFDMA subcarriers and power allocation using the dual decomposition method. Then, we propose an efficient algorithm based on the Hungarian method in order to find a suboptimal but low complexity solution. Moreover, we propose an OFDMA planning solution for high-speed train by finding the maximal inter-BS distance given the required user data rates in order to perform seamless handover. Our simulation results illustrate the performance of the proposed resource allocation schemes in the case of the 3GPP Long Term Evolution-Advanced (LTE-A) and compare them with previously developed algorithms as well as with the direct transmission scenario. Our results also highlight the significant planning gain obtained thanks to the use of multiple relays instead of the conventional single relay scenario.

  2. Energy and nuclear power planning study for Thailand

    International Nuclear Information System (INIS)

    1989-08-01

    The present report describes the study conducted in co-operation with several agencies and organizations from Thailand and covers the energy and electricity requirements and the optimal expansion plans for the power generating system for this country up to year 2011. It is emphasized that the study was carried out by a team of experts from the Electricity Generating Authority of Thailand (EGAT), the National Economic and Social Development Board (NESDB), the National Energy Administration (NEA) and the Office of Atomic Energy for Peace (OAEP), who were fully responsible for all phases of the study, including the production of the present report. The IAEA's responsibility was to provide overall co-ordination and general guidance during the conduct of the study, as well as training and assistance in the implementation and use of the IAEA's computerized planning methodologies on the computer facilities of Thailand. Refs, figs and tabs

  3. Multi-Objective Differential Evolution for Voltage Security Constrained Optimal Power Flow in Deregulated Power Systems

    Science.gov (United States)

    Roselyn, J. Preetha; Devaraj, D.; Dash, Subhransu Sekhar

    2013-11-01

    Voltage stability is an important issue in the planning and operation of deregulated power systems. The voltage stability problems is a most challenging one for the system operators in deregulated power systems because of the intense use of transmission line capabilities and poor regulation in market environment. This article addresses the congestion management problem avoiding offline transmission capacity limits related to voltage stability by considering Voltage Security Constrained Optimal Power Flow (VSCOPF) problem in deregulated environment. This article presents the application of Multi Objective Differential Evolution (MODE) algorithm to solve the VSCOPF problem in new competitive power systems. The maximum of L-index of the load buses is taken as the indicator of voltage stability and is incorporated in the Optimal Power Flow (OPF) problem. The proposed method in hybrid power market which also gives solutions to voltage stability problems by considering the generation rescheduling cost and load shedding cost which relieves the congestion problem in deregulated environment. The buses for load shedding are selected based on the minimum eigen value of Jacobian with respect to the load shed. In the proposed approach, real power settings of generators in base case and contingency cases, generator bus voltage magnitudes, real and reactive power demands of selected load buses using sensitivity analysis are taken as the control variables and are represented as the combination of floating point numbers and integers. DE/randSF/1/bin strategy scheme of differential evolution with self-tuned parameter which employs binomial crossover and difference vector based mutation is used for the VSCOPF problem. A fuzzy based mechanism is employed to get the best compromise solution from the pareto front to aid the decision maker. The proposed VSCOPF planning model is implemented on IEEE 30-bus system, IEEE 57 bus practical system and IEEE 118 bus system. The pareto optimal

  4. Planning For Multiple NASA Missions With Use Of Enabling Radioisotope Power

    Energy Technology Data Exchange (ETDEWEB)

    S.G. Johnson; K.L. Lively; C.C. Dwight

    2013-02-01

    Since the early 1960’s the Department of Energy (DOE) and its predecessor agencies have provided radioisotope power systems (RPS) to NASA as an enabling technology for deep space and various planetary missions. They provide reliable power in situations where solar and/or battery power sources are either untenable or would place an undue mass burden on the mission. In the modern era of the past twenty years there has been no time that multiple missions have been considered for launching from Kennedy Space Center (KSC) during the same year. The closest proximity of missions that involved radioisotope power systems would be that of Galileo (October 1989) and Ulysses (October 1990). The closest that involved radioisotope heater units would be the small rovers Spirit and Opportunity (May and July 2003) used in the Mars Exploration Rovers (MER) mission. It can be argued that the rovers sent to Mars in 2003 were essentially a special case since they staged in the same facility and used a pair of small launch vehicles (Delta II). This paper examines constraints on the frequency of use of radioisotope power systems with regard to launching them from Kennedy Space Center using currently available launch vehicles. This knowledge may be useful as NASA plans for its future deep space or planetary missions where radioisotope power systems are used as an enabling technology. Previous descriptions have focused on single mission chronologies and not analyzed the timelines with an emphasis on multiple missions.

  5. Large Scale Integration of Renewable Power Sources into the Vietnamese Power System

    Science.gov (United States)

    Kies, Alexander; Schyska, Bruno; Thanh Viet, Dinh; von Bremen, Lueder; Heinemann, Detlev; Schramm, Stefan

    2017-04-01

    The Vietnamese Power system is expected to expand considerably in upcoming decades. Power capacities installed are projected to grow from 39 GW in 2015 to 129.5 GW by 2030. Installed wind power capacities are expected to grow to 6 GW (0.8 GW 2015) and solar power capacities to 12 GW (0.85 GW 2015). This goes hand in hand with an increase of the renewable penetration in the power mix from 1.3% from wind and photovoltaics (PV) in 2015 to 5.4% by 2030. The overall potential for wind power in Vietnam is estimated to be around 24 GW. Moreover, the up-scaling of renewable energy sources was formulated as one of the priorized targets of the Vietnamese government in the National Power Development Plan VII. In this work, we investigate the transition of the Vietnamese power system towards high shares of renewables. For this purpose, we jointly optimise the expansion of renewable generation facilities for wind and PV, and the transmission grid within renewable build-up pathways until 2030 and beyond. To simulate the Vietnamese power system and its generation from renewable sources, we use highly spatially and temporally resolved historical weather and load data and the open source modelling toolbox Python for Power System Analysis (PyPSA). We show that the highest potential of renewable generation for wind and PV is observed in southern Vietnam and discuss the resulting need for transmission grid extensions in dependency of the optimal pathway. Furthermore, we show that the smoothing effect of wind power has several considerable beneficial effects and that the Vietnamese hydro power potential can be efficiently used to provide balancing opportunities. This work is part of the R&D Project "Analysis of the Large Scale Integration of Renewable Power into the Future Vietnamese Power System" (GIZ, 2016-2018).

  6. Design and Operation of Power Systems with Large Amounts of Wind Power: Final Summary Report, IEA WIND Task 25, Phase Three 2012-2014

    Energy Technology Data Exchange (ETDEWEB)

    Holttinen, Hannele; Kiviluoma, Juha; Forcione, Alain; Milligan, Michael; Smith, Charles J.; Dillon, Jody; Dobschinski, Jan; van Roon, Serafin; Cutululis, Nicolaos; Orths, Antje; Eriksen, Peter Borre; Carlini, Enrico Maria; Estanqueiro, Ana; Bessa, Ricardo; Soder, Lennart; Farahmand, Hossein; Torres, Jose Rueda; Jianhua, Bai; Kondoh, Junji; Pineda, Ivan; Strbac, Goran

    2016-06-01

    This report summarizes recent findings on wind integration from the 16 countries participating in the International Energy Agency (IEA) Wind collaboration research Task 25 in 2012-2014. Both real experience and studies are reported. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value in operational timescales (balancing related issues). The first section presents variability and uncertainty of power system-wide wind power, and the last section presents recent wind integration studies for higher shares of wind power. Appendix 1 provides a summary of ongoing research in the national projects contributing to Task 25 in 2015-2017.

  7. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  8. Power system generation expansion planning using the maximum principle and analytical production cost model

    International Nuclear Information System (INIS)

    Lee, K.Y.; Park, Y.M.

    1991-01-01

    Historically, the electric utility demand in most countries has increased rapidly, with a doubling of approximately 10 years in the case of developing countries. In order to meet this growth in demand, the planners of expansion policies were concerned with obtaining expansion pans which dictate what new generation facilities to add and when to add them. This paper reports that, however, the practical planning problem is extremely difficult and complex, and required many hours of the planner's time even though the alternatives examined were extremely limited. In this connection, increased motivation for more sophisticated techniques of valuating utility expansion policies has been developed during the past decade. Among them, the long-range generation expansion planning is to select the most economical and reliable generation expansion plans in order to meet future power demand over a long period of time subject to a multitude of technical, economical, and social constraints

  9. Harmonics and voltage stability analysis in power systems including ...

    Indian Academy of Sciences (India)

    R. Narasimhan (Krishtel eMaging) 1461 1996 Oct 15 13:05:22

    two parameters affecting power quality – harmonics and voltage stability. ... is necessary to pay attention to energy system stability in the planning, management, and ... where k ∈ {m, m + 1,... ,n} and n is total number of the buses in the system.

  10. Modernization of electric power systems of the Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gabaldon, M. A.; Gonzalez, J. J.; Prieto, I.

    2011-01-01

    The Power Increase Project of Laguna Verde Nuclear Plant has entailed the replacement, in one unique outage, of the main power electrical systems of the Plant (Isolated Phase Bars, Generator Circuit Breaker and Main Transformer) as well as the replacement of the Turbo-group. The simultaneous substitution of these entire system has never been done by any other Plant in the world, representing an engineering challenge that embraced the design of the new equipment up to the planning, coordination and management of the construction and commissioning works, which were successfully carried out by Iberdrola within the established outage period /47 days) for both units. (Author)

  11. Workforce Planning for New Nuclear Power Programmes

    International Nuclear Information System (INIS)

    2011-01-01

    An appropriate infrastructure is essential for the efficient, safe, reliable and sustainable use of nuclear power. The IAEA continues to be encouraged by its Member States to provide assistance to those considering the introduction of nuclear power. Its response has been to increase technical assistance, organize more missions and hold workshops, as well as to issue new and updated publications in the IAEA Nuclear Energy Series. Milestones in the Development of a National Infrastructure for Nuclear Power, an IAEA Nuclear Energy Series publication (NG-G-3.1), provides detailed guidance on a holistic approach to national nuclear infrastructure development involving three phases. Nineteen issues are identified in this guide, ranging from development of a government's national position on nuclear power to planning for procurement related to the first nuclear power plant. One of these 19 issues upon which each of the other 18 depend is suitable human resources development. As a growing number of Member States begin to consider the nuclear power option, they ask for guidance from the IAEA on how to develop the human resources necessary to launch a nuclear power programme. The nuclear power field, comprising industry, government authorities, regulators, R and D organizations and educational institutions, relies on a specialized, highly trained and motivated workforce for its sustainability and continued success, quite possibly more than any other industrial field. This report has been prepared to provide information on the use of integrated workforce planning as a tool to effectively develop these resources for the spectrum of organizations that have a stake in such nuclear power programmes. These include, during the initial stages, a nuclear energy programme implementing organization (NEPIO), as well as the future operating organization, nuclear regulatory body, government authorities and technical support organizations if a decision is made to initiate a nuclear power

  12. Short-Term Forecasting of Loads and Wind Power for Latvian Power System: Accuracy and Capacity of the Developed Tools

    Directory of Open Access Journals (Sweden)

    Radziukynas V.

    2016-04-01

    Full Text Available The paper analyses the performance results of the recently developed short-term forecasting suit for the Latvian power system. The system load and wind power are forecasted using ANN and ARIMA models, respectively, and the forecasting accuracy is evaluated in terms of errors, mean absolute errors and mean absolute percentage errors. The investigation of influence of additional input variables on load forecasting errors is performed. The interplay of hourly loads and wind power forecasting errors is also evaluated for the Latvian power system with historical loads (the year 2011 and planned wind power capacities (the year 2023.

  13. Short-Term Forecasting of Loads and Wind Power for Latvian Power System: Accuracy and Capacity of the Developed Tools

    Science.gov (United States)

    Radziukynas, V.; Klementavičius, A.

    2016-04-01

    The paper analyses the performance results of the recently developed short-term forecasting suit for the Latvian power system. The system load and wind power are forecasted using ANN and ARIMA models, respectively, and the forecasting accuracy is evaluated in terms of errors, mean absolute errors and mean absolute percentage errors. The investigation of influence of additional input variables on load forecasting errors is performed. The interplay of hourly loads and wind power forecasting errors is also evaluated for the Latvian power system with historical loads (the year 2011) and planned wind power capacities (the year 2023).

  14. Real-Time Tariffs for Electric Vehicles in Wind Power based Power Systems

    DEFF Research Database (Denmark)

    Morais, Hugo; Sousa, Tiago; Silva, Marco

    2013-01-01

    ’ behaviour and also the impact in load diagram. The paper proposes the energy price variation according to the relation between wind generation and power consumption. The proposed strategy was tested in two different days in the Danish power system. January 31st and August 13th 2013 were selected because......The use of Electric Vehicles (EVs) will change significantly the planning and management of power systems in a near future. This paper proposes a real-time tariff strategy for the charge process of the EVs. The main objective is to evaluate the influence of real-time tariffs in the EVs owners...... of the high quantities of wind generation. The main goal is to evaluate the changes in the EVs charging diagram with the energy price preventing wind curtailment....

  15. Future radioisotope power needs for missions to the solar system

    International Nuclear Information System (INIS)

    Mondt, J.F.; Underwood, M.L.; Nesmith, B.J.

    1997-01-01

    NASA and DOE plan a cooperative team effort with industry, government laboratories and universities to develop a near term, low cost, low power (100 watt electric class), low mass (<10 kg), advanced radioisotope space power source (ARPS) and in the process reduce the plutonium-related costs as well. The near term is focused on developing an advanced energy converter to use with the General Purpose Heat Source (GPHS). The GPHS was developed and used for the current radioisotope thermoelectric generators (RTGs). Advanced energy converter technologies are needed as a more efficient replacement for the existing thermoelectric converters so that the space radioisotope power source mass and cost can be reduced. a more advanced technology space radioisotope power system program is also planned that addresses a longer-term need. Twenty first century robotic scientific information missions to the outer planets and beyond are planned to be accomplished with microspacecraft which may demand safe, even more compact, lower-power, lower-mass radioisotope power sources than those which can be achieved as a result of the near term efforts. The longer-term program focuses not only on converter technology but also on lower power, more compact radioisotope heat source technology and smaller, lower mass radioisotope heater units for second generation microspacecraft. This more ambitious, longer time-horizon focus necessarily occurs at this time on the technology R and D level rather than at the system technology level

  16. IEEE guide for planning of pre-operational testing programs for class 1E power systems for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Institute of Electrical and Electronics Engineers (IEEE) guide for pre-operational testing of Class 1E power systems for nuclear-power generating stations is presented. The guidelines apply to power systems both ac and dc supplies but not to the equipment which utilizes the ac and dc power. The pre-operational tests are performed after appropriate construction tests

  17. Dimensioning aspects of 48 V telecommunications power supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Jakab, L. [Siemens Telefongyar Kft (Hungary)

    2000-07-01

    Considering the reliable operation of the 48 V telecommunications power supply systems it is essential the appropriate dimensioning. The basic elements of the power supply systems, i.e. batteries, rectifiers, DC/AC cabling, fuses, etc., should be defined by exact calculation. The presentation reviews the main questions and problems of dimensioning. It lays a special emphasis on the optimized planning procedure, further it also deals with the economical impacts of the dimensioning parameters. (orig.)

  18. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    International Nuclear Information System (INIS)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design

  19. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design.

  20. Flexibility-Based Evaluation of Variable Generation Acceptability in Korean Power System

    Directory of Open Access Journals (Sweden)

    Chang-Gi Min

    2017-06-01

    Full Text Available This study proposes an evaluation method for variable generation (VG acceptability with an adequate level of power system flexibility. In this method, a risk index referred to as the ramping capability shortage expectation (RSE is used to quantify flexibility. The RSE value of the current power system is selected as the adequate level of flexibility (i.e., RSE criterion. VG acceptability is represented by the VG penetration level for the RSE criterion. The proposed evaluation method was applied to the generation expansion plan in Korea for 2029 in order to examine the validity of the existing plan for VG penetration. Sensitivity analysis was also performed to analyze the effects of changes in system uncertainty on VG acceptability. The results show that the planned VG penetration level for 2029 can improve by approximately 12% while securing flexibility.

  1. Interconnected Power Systems Mexico-Guatemala financed by BID

    International Nuclear Information System (INIS)

    Martinez, Veronica

    2003-01-01

    The article describes the plans for the interconnection of the electric power systems of Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, Panama and Mexico within the project Plan Pueba Panama. The objective of the interconnection is to create an electric market in the region that contributes to reduce costs and prices. The project will receive a financing of $37.5 millions of US dollars from the Banco Intrameramericano de Desarrollo (BID)

  2. Using the ENPEP program for nuclear power planning study in Vietnam

    International Nuclear Information System (INIS)

    Le Van Hong; Hamilton, B.; Conzelmann, G.; Phung Manh Duc

    2000-01-01

    In the framework of national R-D project KH-09-04 ''Establishment the fundamental basic for the introduction of nuclear power into Vietnam'', 1996-1998, and Technical cooperation project VIE/0/009 ''Prefeasibility study for the introduction of nuclear power plant into Vietnam'', 1997-1999, planning study of energy and nuclear power has been conducted. Based on 3 scenarios (high, based and low) of the Vietnam socio-economic development up to year 2020, the energy demand (forecasting was carried out using computer model MAED. The electricity demand forecast obtained from the MAED is used as one of the basic inputs to the optimization study of the electricity generating sector using the WASP model. In view of the limited, energy supplies form indigenous resources, it has been assumed that imported coal and nuclear power will be considered as the future energy supply options. From the results of optimal electric system expansion found in the study, it can be concluded that nuclear power should be added to the system from 2016 to 2020 depends on national economic development and availability of domestic natural gas sully (author)

  3. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  4. Electric Utility Generating Units: Repealing the Clean Power Plan

    Science.gov (United States)

    The Clean Power Plan established emission guidelines for states to follow in limiting carbon dioxide (CO2) emissions from existing power plants. EPA is proposing to repeal the CPP and rescind the accompanying legal memorandum.

  5. Factor analysis for imperfect maintenance planning at nuclear power plants by cognitive task analysis

    International Nuclear Information System (INIS)

    Takagawa, Kenichi; Iida, Hiroyasu

    2011-01-01

    Imperfect maintenance planning was frequently identified in domestic nuclear power plants. To prevent such an event, we analyzed causal factors in maintenance planning stages and showed the directionality of countermeasures in this study. There is a pragmatic limit in finding the causal factors from the items based on report descriptions. Therefore, the idea of the systemic accident model, which is used to monitor the performance variability in normal circumstances, is taken as a new concept instead of investigating negative factors. As an actual method for analyzing usual activities, cognitive task analysis (CTA) was applied. Persons who experienced various maintenance activities at one electric power company were interviewed about sources related to decision making during maintenance planning, and then usual factors affecting planning were extracted as performance variability factors. The tendency of domestic events was analyzed using the classification item of those factors, and the directionality of countermeasures was shown. The following are critical for preventing imperfect maintenance planning: the persons in charge should fully understand the situation of the equipment for which they are responsible in the work planning and maintenance evaluation stages, and they should definitely understand, for example, the maintenance bases of that equipment. (author)

  6. Improved Management of Part Safety Classification System for Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jin Young; Park, Youn Won; Park, Heung Gyu; Park, Hyo Chan [BEES Inc., Daejeon (Korea, Republic of)

    2016-10-15

    As, in recent years, many quality assurance (QA) related incidents, such as falsely-certified parts and forged documentation, etc., were reported in association with the supply of structures, systems, components and parts to nuclear power plants, a need for a better management of safety classification system was addressed so that it would be based more on the level of parts . Presently, the Korean nuclear power plants do not develop and apply relevant procedures for safety classifications, but rather the safety classes of parts are determined solely based on the experience of equipment designers. So proposed in this paper is a better management plan for safety equipment classification system with an aim to strengthen the quality management for parts. The plan was developed through the analysis of newly introduced technical criteria to be applied to parts of nuclear power plant.

  7. 20-kW solar photovoltaic flat-panel power system for an uninterruptible power-system load in El Paso, Texas. Phase II. System fabrication. Final report October 1, 1979-May 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Risser, V.V.

    1981-12-01

    The system plans, construction, integration and test, and performance evaluation are discussed for the photovoltaic power supply at the Newman Power Station in El Paso, Texas. The system consists of 64 parallel-connected panels, each panel containing nine series-connected photovoltaic modules. The system is connected, through power monitoring equipment, to an existing DC bus that supplies uninterruptible power to a computer that controls the power generating equipment. The site is described and possible environmental hazards are assessed. Site preparation and the installation of the photovoltaic panels, electrical cabling, and instrumentation subsystems are described. System testing includes initial system checkout, module performance test, control system test. A training program for operators and maintenance personnel is briefly described, including visual aids. Performance data collection and analysis are described, and actual data are compared with a computer simulation. System drawings are included. (LEW)

  8. Integrated Multimedia Based Intelligent Group Decision Support System for Electrical Power Network

    Directory of Open Access Journals (Sweden)

    Ajay Kumar Saxena

    2002-05-01

    Full Text Available Electrical Power Network in recent time requires an intelligent, virtual environment based decision process for the coordination of all its individual elements and the interrelated tasks. Its ultimate goal is to achieve maximum productivity and efficiency through the efficient and effective application of generation, transmission, distribution, pricing and regulatory systems. However, the complexity of electrical power network and the presence of conflicting multiple goals and objectives postulated by various groups emphasized the need of an intelligent group decision support system approach in this field. In this paper, an Integrated Multimedia based Intelligent Group Decision Support System (IM1GDSS is presented, and its main components are analyzed and discussed. In particular attention is focused on the Data Base, Model Base, Central Black Board (CBB and Multicriteria Futuristic Decision Process (MFDP module. The model base interacts with Electrical Power Network Load Forecasting and Planning (EPNLFP Module; Resource Optimization, Modeling and Simulation (ROMAS Module; Electrical Power Network Control and Evaluation Process (EPNCAEP Module, and MFDP Module through CBB for strategic planning, management control, operational planning and transaction processing. The richness of multimedia channels adds a totally new dimension in a group decision making for Electrical Power Network. The proposed IMIGDSS is a user friendly, highly interactive group decision making system, based on efficient intelligent and multimedia communication support for group discussions, retrieval of content and multi criteria decision analysis.

  9. Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis of orbital systems

    Science.gov (United States)

    1976-01-01

    Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.

  10. The power industry of the Magadan oblast: part of the Leninist GOELRO (State Commission for the Electrification of Russia) plan

    Energy Technology Data Exchange (ETDEWEB)

    Pozdnyak, I.G.; Anishchenko, Ye.B.

    1981-01-01

    A brief history is given of the development of the Magadan oblast's power industry, which is inseparably connected with development of the very rich raw material resources and fast development of the mining industry. In 1985 completion of construction of the Kolyma GES is planned; with the end of its construction will begin preparatory work one Ust'-Srednekansk GES: the second GES of the Kalyma falls. Work has begun since 1981 to expand the third phase of the Magadan heat and electric power plant. In 1982 completion of installation of power equipment at the Arkagalinsk State regional power plant is planned. In the 11th five-year plan construction of the system of 220 kV power lines will be finished, and 110 and 35 kV power distribution lines will be built. A special place belongs to construction of the Lankovskaya thermal power plant, which will aid in creating a stable fuel-energy base with a positive future. Chukotka power will be further developed. By 1990, 18 more state farms should be connected to the state power system. Completing the power basis in the Magadan oblast will enable an acceleration in its development, and a rise in the material and cultural standard of living of the people of the Far Northeast.

  11. Comparison of two new short-term wind-power forecasting systems

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez-Rosado, Ignacio J. [Department of Electrical Engineering, University of Zaragoza, Zaragoza (Spain); Fernandez-Jimenez, L. Alfredo [Department of Electrical Engineering, University of La Rioja, Logrono (Spain); Monteiro, Claudio; Sousa, Joao; Bessa, Ricardo [FEUP, Fac. Engenharia Univ. Porto (Portugal)]|[INESC - Instituto de Engenharia de Sistemas e Computadores do Porto, Porto (Portugal)

    2009-07-15

    This paper presents a comparison of two new advanced statistical short-term wind-power forecasting systems developed by two independent research teams. The input variables used in both systems were the same: forecasted meteorological variable values obtained from a numerical weather prediction model; and electric power-generation registers from the SCADA system of the wind farm. Both systems are described in detail and the forecasting results compared, revealing great similarities, although the proposed structures of the two systems are different. The forecast horizon for both systems is 72 h, allowing the use of the forecasted values in electric market operations, as diary and intra-diary power generation bid offers, and in wind-farm maintenance planning. (author)

  12. Relation between source term and emergency planning for nuclear power plants

    International Nuclear Information System (INIS)

    Shi Zhongqi; Yang Ling

    1992-01-01

    Some background information of the severe accidents and source terms related to the nuclear power plant emergency planning are presented. The new source term information in NUREG-0956 and NUREG-1150, and possible changes in emergency planning requirements in U.S.A. are briefly provided. It is suggested that a principle is used in selecting source terms for establishing the emergency planning policy and a method is used in determining the Emergency Planning Zone (EPZ) size in China. Based on the research results of (1) EPZ size of PWR nuclear power plants being built in China, and (2) impact of reactor size and selected source terms on the EPZ size, it is concluded that the suggested principle and the method are suitable and feasible for PWR nuclear power plants in China

  13. Selectivity of power system protections at power swings in power system

    Directory of Open Access Journals (Sweden)

    Jan Machowski

    2012-12-01

    Full Text Available The paper discusses out-of-step protection systems such as: generator pole slip protections, out of step tripping protections, distance protections of step-up transformer, distance protections of transmission lines and transformers, power swing blocking, and special out-of-step protection. It is shown that all these protections make up a protection system, to which a setting concept uniform for the entire power system has to be applied. If a power system is inappropriately equipped with these protections, or their settings are inappropriate, they may operate unselectively, thus contributing to the development of power system blackouts. In the paper the concepts for a real power system are given for the two stages: target stage fully compliant with selectivity criteria, and transitional stage between the current and target stages.

  14. Implementation of a Document Management System in an Operating Nuclear Power Plan

    International Nuclear Information System (INIS)

    Martinez Ladron de Guevara, J.

    1996-01-01

    The difficulty of implementing a document management system in an operating nuclear power plant basically lies in the high volume of information to be handled, in the different storage devices used and in the complexity of relations existing between the documentation and the physical elements of the facility. The documentation used in a power plant, mainly technical, is often stored on different devices (paper, microfilm, aperture cards, test files, vector files, raster files, etc) and usually features various identification criteria (engineering, manufacturing, plant staff, etc). Consequently, the system must be aimed at the management of multiformatted documentation, providing appropriate means of identification, capture and display for each case. The document management system must satisfy all information needs of each department of the plant, and should be adapted to the work cycles of the plant. Moreover, it should be integrated into other computer application in operation (maintenance, operation, procurement, etc), so that links can be established between the documentation and configuration elements. Although this is a complex procedure in operating power plants, there are integrating tools that facilitate the gradual implementation of this type of system. (Author)

  15. Multi-objective optimal planning of the stand-alone microgrid system based on different benefit subjects

    International Nuclear Information System (INIS)

    Guo, Li; Wang, Nan; Lu, Hai; Li, Xialin; Wang, Chengshan

    2016-01-01

    As an important means to realize the energetic complementarity and improve the efficiency of renewable resources, the stand-alone microgrid (SAMG) system gains attention increasingly, especially in islands and remote areas. In this paper, considering the interest conflict of the distribution company and the distributed generation owner, a new multi-objective optimal planning model is formulated for medium voltage SAMG. Besides, to avoid the power constraint of distributed generation (DG) once the over-limit voltage occurs, a novel two-step power dispatch control method including the voltage regulation strategy is proposed, in which the absorption of distributed power by energy storage system (ESS) and the reactive power adjustment though its power control system are used to regulate voltage. The goal of this paper is to search the Pareto-optimal front of the site and capacity of DG as well as the contract price between both parties, and thus can provide effective references for practical planning of SAMG. Considering the high cost of ESS, the investment analysis of ESS is also discussed in the paper. - Highlights: • A multi-objective planning model based on different benefit subjects is proposed. • A two-step power dispatch method including the voltage regulation is proposed. • The economical efficiency of the proposed model is analyzed. • The effective reference for the stand-alone microgrid planning is provided.

  16. Kuroshio power plant development plan

    International Nuclear Information System (INIS)

    Chen, Falin

    2010-01-01

    As a country lacking energy reserves, Taiwan imports 99.2% of its energy, with only a small portion of indigenous energy, such as hydro, wind, and solar. In 2008, each Taiwanese spent 85,000 NTD dollars (1 USD ∝ 32 NTD) to purchase oil, coal, gas, and nuclear fuel from foreign countries, accounting for a total payment of 1.8 trillion NTD, more than the annual budget of the Taiwan government of 1.7 trillion NTD. In the same year, Taiwan emitted about 1% of the world's greenhouse gas (GHG), or 12 tons per person-year, ranking 18th globally. These situations in terms of energy security and carbon emission are very severe. To resolve these severe situations, harnessing the power of the Kuroshio in eastern Taiwan offers a great opportunity. The Kuroshio is a branch of the North Pacific Ocean current. Due to the westward-enhanced effect, this ocean current is strong and stable as it passes through eastern Taiwan. The flow rate is about 30 sverdrup (Sv) or 1000 times that of the Yangtze River, the average speed is 1 m/s, the flow direction is fixed to the north, and the flow path is close to the east coast of Taiwan. By precisely locating high-quality sites and implementing sequential works with careful planning, one can possibly generate exploitable power more than 30 GW. With 30 GW of clean energy, Taiwan could effectively enhance energy security, reduce GHG emission, and lower energy-purchasing cost. This paper proposes a feasibility study to explore the power of the Kuroshio. The content consists of four parts: (1) assessment of Kuroshio power reserves, (2) development of turbine generators, (3) development of turbine-anchor system, and (4) deep-sea marine engineering of turbine clusters. By integrating these technologies above, we propose a project to construct a 30 MW pilot plant. In this project, we also discuss the financial analysis and propose new regulations, environmental impact analysis, risk assessment, and other relevant issues. (author)

  17. Requirement analysis for autonomous systems and intelligent agents in future Danish electric power systems

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten

    2010-01-01

    we review innovative control architectures in electric power systems such as Microgrids, Virtual power plants and Cell based systems. We evaluate application of autonomous systems and intelligent agents in each of these control architectures particularly in the context of Denmark's strategic energy...... plans. The second part formulates a flexible control architecture for electric power systems with very high penetration of distributed generation. This control architecture is based upon the requirements identified in the first part. We also present development of a software framework to test......Denmark has already achieved a record of 20% penetration of wind power and now moving towards even higher targets with an increasing part of the electricity produced by distributed generators (DGs). In this paper we report work from a sub activity "subgrid design" of the EcoGrid.dk project. First...

  18. Nuclear power plant thermal-hydraulic performance research program plan

    International Nuclear Information System (INIS)

    1988-07-01

    The purpose of this program plan is to present a more detailed description of the thermal-hydraulic research program than that provided in the NRC Five-Year Plan so that the research plan and objectives can be better understood and evaluated by the offices concerned. The plan is prepared by the Office of Nuclear Regulatory Research (RES) with input from the Office of Nuclear Reactor Regulation (NRR) and updated periodically. The plan covers the research sponsored by the Reactor and Plant Systems Branch and defines the major issues (related to thermal-hydraulic behavior in nuclear power plants) the NRC is seeking to resolve and provides plans for their resolution; relates the proposed research to these issues; defines the products needed to resolve these issues; provides a context that shows both the historical perspective and the relationship of individual projects to the overall objectives; and defines major interfaces with other disciplines (e.g., structural, risk, human factors, accident management, severe accident) needed for total resolution of some issues. This plan addresses the types of thermal-hydraulic transients that are normally considered in the regulatory process of licensing the current generation of light water reactors. This process is influenced by the regulatory requirements imposed by NRC and the consequent need for technical information that is supplied by RES through its contractors. Thus, most contractor programmatic work is administered by RES. Regulatory requirements involve the normal review of industry analyses of design basis accidents, as well as the understanding of abnormal occurrences in operating reactors. Since such transients often involve complex thermal-hydraulic interactions, a well-planned thermal-hydraulic research plan is needed

  19. Study of the proper contribution of independent power producing business in the long-range power supply and demand plan

    Energy Technology Data Exchange (ETDEWEB)

    Jo, S.B. [Korea Energy Economics Institute, Euiwang (Korea, Republic of)

    1997-12-01

    The independent power producing business has expanded its size and process through the Long-range Power Supply and Demand Plan of 1993, 1995, and it is high time that full-scale competition in the power generation market began to emerge. This report assesses the marginal costs of independent and general power producing businesses on a theoretical basis on the proper size of independent power producing business, and presents the methods to compare these. But, since there follows several problems in applying this theoretical model, a practical standard to decide the proper level of independent power production amount is presented. That is, while not much burdening the existing industrial structure, I search for ways to present the amount of independent power production and the methods of power generation to make sure that the competition effect is maximized when full-scale competition started. However, in the long-term, the allotment of independent power production itself could be a violation to the basic spirit of competition. A more desirable way is to allow independent power producers and the Korea Power Corp. to freely compete on all types of power generation and facilities. The supply plan should be also operated smoothly and flexibly since the types of power generation and the amounts reflect the result of competition not the predetermined ones. Therefore, a long-range power supply and demand plan should be converted from a planning-oriented concept to a market-oriented base with the structural overhaul of the power generation industry for the effective resources distribution of power supply facilities. 18 refs., 2 figs., 7 tabs.

  20. Long-term energy planning of Croatian power system using multi-objective optimization with focus on renewable energy and integration of electric vehicles

    International Nuclear Information System (INIS)

    Prebeg, Pero; Gasparovic, Goran; Krajacic, Goran; Duic, Neven

    2016-01-01

    Highlights: • Optimization of supply side long-term energy planning of large power system. • Integration of renewable sources and electrical vehicles in large power system. • Multi-level, multi-objective optimization for a design of energy system. • Historical river flow data analysis for modeling of aggregated hydropower potential. - Abstract: Due to the stochastic nature and variability of renewable energy sources (RES), it is necessary to integrate still expensive storage capacities into an energy system with a high share of RES and to model appropriate energy market. The study presented here considers all energy carriers, however, only the electricity carrier is modeled in detail, with notion taken for the heating demand that is covered but without proper modeling of storage. A proposed two-level approach with multi-objective optimization on the global level, was used to design a Croatian Energy System (CES), where electric vehicles (EVs) are integrated to serve as battery storage in Vehicle-to-Grid (V2G) mode, for a scenario between 2015 and 2050. In addition, case study includes nine aggregated hydro power plants, one for each river basin in Croatia. Also, case study includes solar and wind power plants modeled for six locations in Croatia: Osijek, Zagreb, Rijeka, Sibenik, Split and Dubrovnik. The resulting Pareto front suggests that with assumed future costs of fuels and technology certain level of conventional energy sources will have to remain in the energy system to take into the account unfavourable weather conditions and to cover heating demand, which also results in significantly lower load factors for those power plants. Also, variants with more RES share have lower total energy system load factor and significantly higher installed capacity.

  1. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  2. Proceedings of AsiaPES 2007 : Asian power and energy systems conference

    Energy Technology Data Exchange (ETDEWEB)

    Ongsakul, W. [Asian Inst. of Technology, Pathumthani (Thailand)] (ed.)

    2007-07-01

    This energy and power systems conference provided a forum for international researchers and power industry members to discuss recent technological innovations related to power systems. New technologies and modelling strategies for power systems were identified along with issues related to artificial intelligence and design optimization. The role of renewable energy sources such as solar, wind and biomass energy in interconnected power systems were also reviewed. The conference was divided into 8 sessions entitled: (1) control, protection, power flow and design, (2) planning and operation, (3) alternative energy, (4) stability, reliability, forecasting and load shedding, (5) phasor measurement and power quality, (6) distribution, analysis, technology and policy (7) energy efficiency, storage and pricing, and (8) a special session on the application of phasor measurement units to monitor wide area power system dynamics. The conference featured 88 presentations, of which 63 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  3. Wind power planning in France (Aveyron), from State regulation to local planning

    Energy Technology Data Exchange (ETDEWEB)

    Nadai, Alain [CIRED - Centre Int. de Recherche sur l' Environnement et le Developpement (France); Labussiere, Olivier [Univ. de Pau et des Pays de l' Adour, Laboratoire Societe Environnement Territoire (France)

    2007-07-01

    Since a few years, French wind power has undertaken an unprecedented development. Few turbines are in place (756 MW), but the overall granted capacity amounts to about 2.7 GW. The administrative territory of Aveyron, one of the best wind power potential in the Country, is an interesting case for understanding the ways in which industrial wind power is being developed and regulated in France. The paper presents Aveyron wind power development by dividing it into three periods. For each period, we also sketch national developments in wind power policy.Between 1996 and 2000, Aveyron was one of the few places selected for developing wind parks under the French 'Eole 2005' call for tender. Between 2000 and 2005, French regulation shifted to fixed tariffs for small wind parks (less than 12 MW). The lack of planning approach provided developers with a window for profits. Numerous projects of small parks were submitted for development authorisation, overflowing the local administration. During the year of 2003, a new law on urbanism provided some rules for individual project developments without answering the key issue of territorial planning. In Aveyron, a local scheme devised by the decentralized branches of the State had a limited reach due to the lack of mandatory status and concentration.In July 2005, a new Energy Law imposed the design of Wind Power Development Zones (WPDZ) as a condition for tariff benefit (starting July 2007). WPDZ appeared to local actors as a promising tool but it came late. Many projects were already granted with construction permits.

  4. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  5. Design manual of the wind power system; Furyoku hatsuden system no sekkei manual

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    For the purpose of contributing to the promotion/introduction of the wind power generation in Japan, systematical arrangement was made on items, standards/related laws, etc. to be considered upon designing the wind power system, further describing design examples of the standard system (case study). Out of the items necessary for the design, as to the investigation, arranged were matters and methods to be field-surveyed such as the site situation, surroundings, radio wave hindrance, noise hindrance, measurement, geology, etc. Concerning the determination of sizes of wind turbines to be introduced, procedures for setting sizes of wind turbines suitable for the places proposed for the installation were described. In the design, the knacks were summed up of designing wind power generation facilities, electric equipment, electric works, civil engineering, and measuring instrument. As to the working plan, indicated were the points to be taken notice of in the plan and the standard working process. Also shown were the evaluation method of economic efficiency, etc. In addition, the paper includes the related laws, system design examples, and the data attached. 10 refs., 13 figs., 59 tabs.

  6. Kilowatt isotope power system. Phase II plan. Volume V. Safety, quality assurance and reliability

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Included in this volume are: launch and flight safety considerations; quality assurance techniques and procedures to be followed through system fabrication, assembly and inspection; and the reliability program made up of reliability prediction analysis, failure mode analysis and criticality analysis

  7. Methods and Algorithms for Economic MPC in Power Production Planning

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil

    in real-time. A generator can represent a producer of electricity, a consumer of electricity, or possibly both. Examples of generators are heat pumps, electric vehicles, wind turbines, virtual power plants, solar cells, and conventional fuel-fired thermal power plants. Although this thesis is mainly...... concerned with EMPC for minutes-ahead production planning, we show that the proposed EMPC scheme can be extended to days-ahead planning (including unit commitment) as well. The power generation from renewable energy sources such as wind and solar power is inherently uncertain and variable. A portfolio...... design an algorithm based on the alternating direction method of multipliers (ADMM) to solve input-constrained OCPs with convex objective functions. The OCPs that occur in EMPC of dynamically decoupled subsystems, e.g. power generators, have a block-angular structure. Subsystem decomposition algorithms...

  8. Operation and maintenance support expert systems for BWR nuclear power plants

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo; Hayakawa, Hiroyasu; Fukutomi, Shigeki

    1990-01-01

    Toshiba has been developing expert systems for operation and maintenance support in BWRs. These expert systems are designed to be integrated with conventional plant monitoring systems, and maintenance management systems to provide both comprehensive and powerful support capabilities. Some of these expert systems are already being used on a trial basis both within Toshiba and in electric power utility companies. This paper describes expert systems for the support of plant and equipment monitoring, maintenance scheduling, and maintenance work procedure planning. (author)

  9. INFORMATION SYSTEM STRATEGIC PLANNING WITH ENTERPRISE ARCHITECTURE PLANNING

    Directory of Open Access Journals (Sweden)

    Lola Yorita Astri

    2013-05-01

    Full Text Available An integrated information system is needed in an enterprise to support businessprocesses run by an enterprise. Therefore, to develop information system can use enterprisearchitecture approach which can define strategic planning of enterprise information system. SMPNegeri 1 Jambi can be viewed as an enterprise because there are entities that should be managedthrough an integrated information system. Since there has been no unification of different elementsin a unity yet, enterprise architecture model using Enterprise Architecture Planning (EAP isneeded which will obtain strategic planning of enterprise information system in SMP Negeri 1Jambi. The goal of strategic planning of information system with Enterprise Architecture Planning(EAP is to define primary activities run by SMP Negeri 1 Jambi and support activities supportingprimary activities. They can be used as a basis for making data architecture which is the entities ofapplication architecture. At last, technology architecture is designed to describe technology neededto provide environment for data application. The plan of implementation is the activity plan madeto implemented architectures by enterprise.

  10. Fitting of power generated by nuclear power plants into the Hungarian electricity system

    International Nuclear Information System (INIS)

    Lengyel, Gyula; Potecz, Bela

    1984-01-01

    The moderate increase of electrical energy demands (3% at present) can only be met by the parallel application of fossil and nuclear power plants and by electric power import via the transmission lines of the CMEA countries. The changes in the electrical energy and fuel demands and the development of the available capacities during the last 35 years are reviewed. The major purpose of Hungarian power economy is to save hydrocarbon fuels by taking advantages of power import opportunities by operating nuclear power plants at maximum capacity and the coal fired power stations at high capacity. The basic principles, the algorithm applied to optimize the load distribution of the electrical power system are discussed in detail with special attention to the role of nuclear power. The planned availability of nuclear power plants and the amount of electricity generated by nuclear plants should also be optimized. (V.N.)

  11. Analysis of Highly Wind Power Integrated Power System model performance during Critical Weather conditions

    DEFF Research Database (Denmark)

    Basit, Abdul; Hansen, Anca Daniela; Sørensen, Poul Ejnar

    2014-01-01

    , is provided by the hour-ahead power balancing model, i.e. Simulation power Balancing model (SimBa. The regulating power plan is prepared from day-ahead power production plan and hour-ahead wind power forecast. The wind power (forecasts and available) are provided by the Correlated Wind power fluctuations (Cor......Wind) model, where the wind turbine storm controllers are also implemented....

  12. Daya Bay Nuclear Power Station five-year business plan and operating results

    International Nuclear Information System (INIS)

    Zhang Shanming

    2000-01-01

    Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear power station has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear Power Station (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 the medium level

  13. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Science.gov (United States)

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  14. Planning of micro-combined heat and power systems in the Portuguese scenario

    International Nuclear Information System (INIS)

    Monteiro, Eliseu; Moreira, Nuno Afonso; Ferreira, Sergio

    2009-01-01

    High efficiency cogeneration is seen by the European Commission as part of the solution to increase energy efficiency and improve security of supply in the internal energy markets. Portuguese residential sector has an estimated technical market potential of around 500 MW e for cogeneration of e in size. Additionally, in Portugal there is a specific law for power production in low voltage, where at least 50% of the produced electric energy must be own consumed and the maximum power delivered to the power utility should be less than 150 kW e . Therefore, generic application tools cannot be applied in this regard. In this work, we develop the MicroG model for planning micro-CHP plants in agreement with the Portuguese energy legal framework. The model is able to design, evaluate and optimize from the techno-economic point of view any micro-CHP plant. MicroG appeals to some data bases, such as micro-cogeneration technologies and power consumption profiles that are also described. In addition, a practical case on a gym is considered to show all the functionalities of the model. The developed model has proven to be extremely useful from the practical point of view. This model could help the development of the micro-CHP Portuguese market, which in turns contributes to accomplish the targets of Kyoto protocol and EU cogeneration Directive. Other improvements to MicroG model can be made in order to enlarge the range of application to other micro-cogeneration technologies and to accomplish with the CO 2 emissions trading

  15. Planning of micro-combined heat and power systems in the Portuguese scenario

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Eliseu; Moreira, Nuno Afonso [CITAB, University of Tras-os-Montes e Alto Douro, P-5000-911 Vila Real (Portugal); Ferreira, Sergio [R and D Department, Tecaprod S.A. (Portugal)

    2009-03-15

    High efficiency cogeneration is seen by the European Commission as part of the solution to increase energy efficiency and improve security of supply in the internal energy markets. Portuguese residential sector has an estimated technical market potential of around 500 MW{sub e} for cogeneration of <150 kW{sub e} in size. Additionally, in Portugal there is a specific law for power production in low voltage, where at least 50% of the produced electric energy must be own consumed and the maximum power delivered to the power utility should be less than 150 kW{sub e}. Therefore, generic application tools cannot be applied in this regard. In this work, we develop the MicroG model for planning micro-CHP plants in agreement with the Portuguese energy legal framework. The model is able to design, evaluate and optimize from the techno-economic point of view any micro-CHP plant. MicroG appeals to some data bases, such as micro-cogeneration technologies and power consumption profiles that are also described. In addition, a practical case on a gym is considered to show all the functionalities of the model. The developed model has proven to be extremely useful from the practical point of view. This model could help the development of the micro-CHP Portuguese market, which in turns contributes to accomplish the targets of Kyoto protocol and EU cogeneration Directive. Other improvements to MicroG model can be made in order to enlarge the range of application to other micro-cogeneration technologies and to accomplish with the CO{sub 2} emissions trading. (author)

  16. Reliability Issues in Stirling Radioisotope Power Systems

    Science.gov (United States)

    Schreiber, Jeffrey; Shah, Ashwin

    2005-01-01

    Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

  17. Missions and planning for nuclear space power

    International Nuclear Information System (INIS)

    Buden, D.

    1979-01-01

    Requirements for electrical and propulsion power for space are expected to increase dramatically in the 1980s. Nuclear power is probably the only source for some deep space missions and a major competitor for many orbital missions, especially those at geosynchronous orbit. Because of the potential requirements, a technology program on reactor components has been initiated by the Department of Energy. The missions that are foreseen, the current reactor concept, and the technology program plan are described

  18. Transport and Power System Scenarios for Northern Europe in 2030

    DEFF Research Database (Denmark)

    Juul, Nina; Meibom, Peter

    2009-01-01

    it is assumed that power can go both from grid-to-vehicle and vehicle-to-grid. Oil prices are assumed to be $120/barrel, and CO2 price 40 €/ton. This results in an optimal investment path with a large increase in sustainable energy; primarily wind energy, as well as an increase in the electric drive vehicles......Increasing focus on sustainability affects all parts of the energy system. Integrating the power and transport system in future energy system planning, influences the economically optimal investments and optimal operation of the power system as well as the transport system. This work presents...... analysis of the optimal configuration and operation of the integrated power and transport system in Northern Europe. Optimal configuration and operation is obtained using the optimisation model, Balmorel [1], with a transport model extension. For electric drive vehicles with plug-in capabilities...

  19. Information retrieval system of nuclear power plant database (PPD) user's guide

    International Nuclear Information System (INIS)

    Izumi, Fumio; Horikami, Kunihiko; Kobayashi, Kensuke.

    1990-12-01

    A nuclear power plant database (PPD) and its retrieval system have been developed. The database involves a large number of safety design data of nuclear power plants, operating and planned in Japan. The information stored in the database can be retrieved at high speed, whenever they are needed, by use of the retrieval system. The report is a user's manual of the system to access the database utilizing a display unit of the JAERI computer network system. (author)

  20. Well-Being Analysis of Power Systems Considering Increasing Deployment of Gas Turbines

    Directory of Open Access Journals (Sweden)

    Bomiao Liang

    2017-07-01

    Full Text Available With the significant decrease in natural gas prices in many parts of the world, the employment of gas turbine (GT units has increased steadily in recent years. The ever-increasing deployment of GT units is strengthening the interconnections between electric power and natural gas systems, which could provide a higher level of operational flexibility and reliability. As a result, the planning and operation issues in the interconnected electric power and natural gas systems have aroused concern. In these circumstances, the impacts of increasing deployment of GT units in power system operation are studied and evaluated through well-being analysis (WBA. The fast responsive characteristics of GT units are analyzed first, and the definition and adaption of WBA in a power system with increasing deployment of GT units are addressed. Then the equivalent reserve capacity of GT units is estimated, taking demand fluctuations, commitment plans, and operational risks of GT units into account. The WBA of a power system with increasing deployment of GT units is conducted considering the uncertainties of system operation states and renewable energy sources. Finally, the proposed methods are validated through an integrated version of the IEEE 118-bus power system and a 10-bus natural gas system, and the impacts of GT units on power system security under various penetration levels are examined. Simulation results demonstrate that the role of a GT unit as a low-cost electricity producer may conflict with its role as a reserve provider, but through maintaining a proper proportion of idle GT capacities for reserve, the well-being performance of the power system concerned can be significantly improved.

  1. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  2. Power system economics : the Nordic electricity market. 2nd ed.

    International Nuclear Information System (INIS)

    Wangensteen, Ivar

    2012-01-01

    This book written as a textbook for students of engineering is designed for the Norwegian Power Markets course which is part of the Energy and Environment Master's Program and the recently established international MSc program in Electric Power Engineering. As the title indicates, the book deals with both power system economics in general and the practical implementation and experience from the Nordic market. Areas of coverage include: -- Restructuring/deregulation of the power supply system -- Grid access including tariffs and congestion management -- Generation planning -- Market modeling -- Ancillary services -- Regulation of grid monopolies. Although Power Systems Economics is written primarily as a textbook for students, other readers will also find the book interesting. It deals with problems that have been subject of considerable attention in the power sector for some years and it addresses issues that are still relevant and important. (au)

  3. Power system economics : the Nordic electricity market. 2nd ed.

    Energy Technology Data Exchange (ETDEWEB)

    Wangensteen, Ivar

    2012-07-01

    This book written as a textbook for students of engineering is designed for the Norwegian Power Markets course which is part of the Energy and Environment Master's Program and the recently established international MSc program in Electric Power Engineering. As the title indicates, the book deals with both power system economics in general and the practical implementation and experience from the Nordic market. Areas of coverage include: -- Restructuring/deregulation of the power supply system -- Grid access including tariffs and congestion management -- Generation planning -- Market modeling -- Ancillary services -- Regulation of grid monopolies. Although Power Systems Economics is written primarily as a textbook for students, other readers will also find the book interesting. It deals with problems that have been subject of considerable attention in the power sector for some years and it addresses issues that are still relevant and important. (au)

  4. Long-term power generation expansion planning with short-term demand response: Model, algorithms, implementation, and electricity policies

    Science.gov (United States)

    Lohmann, Timo

    Electric sector models are powerful tools that guide policy makers and stakeholders. Long-term power generation expansion planning models are a prominent example and determine a capacity expansion for an existing power system over a long planning horizon. With the changes in the power industry away from monopolies and regulation, the focus of these models has shifted to competing electric companies maximizing their profit in a deregulated electricity market. In recent years, consumers have started to participate in demand response programs, actively influencing electricity load and price in the power system. We introduce a model that features investment and retirement decisions over a long planning horizon of more than 20 years, as well as an hourly representation of day-ahead electricity markets in which sellers of electricity face buyers. This combination makes our model both unique and challenging to solve. Decomposition algorithms, and especially Benders decomposition, can exploit the model structure. We present a novel method that can be seen as an alternative to generalized Benders decomposition and relies on dynamic linear overestimation. We prove its finite convergence and present computational results, demonstrating its superiority over traditional approaches. In certain special cases of our model, all necessary solution values in the decomposition algorithms can be directly calculated and solving mathematical programming problems becomes entirely obsolete. This leads to highly efficient algorithms that drastically outperform their programming problem-based counterparts. Furthermore, we discuss the implementation of all tailored algorithms and the challenges from a modeling software developer's standpoint, providing an insider's look into the modeling language GAMS. Finally, we apply our model to the Texas power system and design two electricity policies motivated by the U.S. Environment Protection Agency's recently proposed CO2 emissions targets for the

  5. Stochastic assessment of investment efficiency in a power system

    International Nuclear Information System (INIS)

    Davidov, Sreten; Pantoš, Miloš

    2017-01-01

    The assessment of investment efficiency plays a critical role in investment prioritization in the context of electrical network expansion planning. Hence, this paper proposes new criteria for the cost-efficiency investment applied in the investment ranking process in electrical network planning, based on the assessment of the new investment candidates impact on active-power losses, bus voltages and line loadings in the network. These three general criteria are chosen due to their strong economic influence when the active-power losses and line loadings are considered and due to their significant impact on quality of supply allowed for the voltage profile. Electrical network reliability of supply is not addressed, since, this criterion has already been extensively applied in other solutions regarding investment efficiency assessment. The proposed ranking procedure involves a stochastic approach applying the Monte Carlo method in the scenario preparation. The number of scenarios is further reduced by the K-MEANS procedure in order to speed up the investment efficiency assessment. The proposed ranking procedure is tested using the standard New England test system. The results show that based on the newly involved investment assessment criteria indices, system operators will obtain a prioritized list of investments that will prevent excessive and economically wasteful spending. - Highlights: • Active-Power Loss Investment Efficiency Index LEI. • Voltage Profile Investment Efficiency Index VEI. • Active-Power Flow Loading Mitigation Investment Efficiency Index PEI. • Optimization model for network expansion planning with new indices.

  6. Reorganization of the Lithuanian State Power System

    International Nuclear Information System (INIS)

    Paskevicius, V.

    1995-01-01

    This article deals with preasent situation in energy sector in Lithuania. All power plants with installed capacity of 2561 MW, except Ignalina Nuclear Power Plant (3000 MW) belongs to Lithuanian State Power System (LSPS) as well transmission and distribution networks. In 1989-1991 Lithuania generated approximately 29TWh of electricity annually from which 12TWh LSPS exported to neighbouring countries. After 1990 in the transitional period from planned economy to the marked one, the economic situation in the country became complicated. The electricity demand has fallen nearly 40%. Due to the similar situation in neighboring countries the electricity export has decreased too. The article presents the distribution of electric power output in 1994 by power plants; electric power consumption and output of power plants in Lithuania from 1940 to 1994 is also included. Some aspects of regional cooperation of tree Baltic countries in energy area is touched too. 3 figs

  7. Some consideration on nuclear power development. Topics aroused by U.S. proposed 'Generation IV Nuclear Power System

    International Nuclear Information System (INIS)

    Wang Chuanying; Chen Shiqi

    2001-01-01

    U.S. proposed 'Generation IV Nuclear Power System' concept. Its origin and proposed goals for it are analyzed; goals are compared with requirements of URD. In particular, discussed issues on nuclear fuel cycle and Non-proliferation. A well-considered nuclear power development plan, paying close attention to international trend and considering comprehensively domestic situation, is expected

  8. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  9. Extension planning for electrical energy supply systems

    International Nuclear Information System (INIS)

    Bieselt, R.

    1975-01-01

    In the future as well as in the past, and in particular in the next decade a considerable increase in electrical energy demand can be expected. To satisfy this demand in a reliable and sufficient manner will force the utilities to invest large sums of money for the operation and the extension of power generation and distribution plants. The size of these investments justifies the search for more and more comprehensive and at the same time more detailed planning methods. With the help of system analysis a planning model for the electricity supply industry of a major supply area will be designed. (orig./RW) [de

  10. Proceedings of the 4. IASTED Asian conference on power and energy systems : AsiaPES 2008

    Energy Technology Data Exchange (ETDEWEB)

    Nor, K.M. [Technological Univ. of Malaysia, Kuala Lumpur (Malaysia)] (ed.)

    2008-07-01

    Recent technological innovations related to power systems were presented at this international energy and power systems conference. New technologies and modelling strategies for power systems were identified along with issues related to artificial intelligence and design optimization. The role of renewable energy sources such as solar, wind and biomass energy in interconnected power systems were also reviewed. The conference was divided into 9 sessions entitled: (1) distribution systems, (2) electromagnetic fields, (3) power quality, (4) power system operations, (5) power system planning, (6) power system protection, (7) power system stability, (8) renewable energy, and (9); thermal systems. All 68 presentations from the conference have been catalogued separately for inclusion in this database. refs., tabs., figs.

  11. Autonomous power networks based power system

    International Nuclear Information System (INIS)

    Jokic, A.; Van den Bosch, P.P.J.

    2006-01-01

    This paper presented the concept of autonomous networks to cope with this increased complexity in power systems while enhancing market-based operation. The operation of future power systems will be more challenging and demanding than present systems because of increased uncertainties, less inertia in the system, replacement of centralized coordinating activities by decentralized parties and the reliance on dynamic markets for both power balancing and system reliability. An autonomous network includes the aggregation of networked producers and consumers in a relatively small area with respect to the overall system. The operation of an autonomous network is coordinated and controlled with one central unit acting as an interface between internal producers/consumers and the rest of the power system. In this study, the power balance problem and system reliability through provision of ancillary services was formulated as an optimization problem for the overall autonomous networks based power system. This paper described the simulation of an optimal autonomous network dispatching in day ahead markets, based on predicted spot prices for real power, and two ancillary services. It was concluded that large changes occur in a power systems structure and operation, most of them adding to the uncertainty and complexity of the system. The introduced concept of an autonomous power network-based power system was shown to be a realistic and consistent approach to formulate and operate a market-based dispatch of both power and ancillary services. 9 refs., 4 figs

  12. Increase of the Integration Degree of Wind Power Plants into the Energy System Using Wind Forecasting and Power Consumption Predictor Models by Transmission System Operator

    Directory of Open Access Journals (Sweden)

    Manusov V.Z.

    2017-12-01

    Full Text Available Wind power plants’ (WPPs high penetration into the power system leads to various inconveniences in the work of system operators. This fact is associated with the unpredictable nature of wind speed and generated power, respectively. Due to these factors, such source of electricity must be connected to the power system to avoid detrimental effects on the stability and quality of electricity. The power generated by the WPPs is not regulated by the system operator. Accurate forecasting of wind speed and power, as well as power load can solve this problem, thereby making a significant contribution to improving the power supply systems reliability. The article presents a mathematical model for the wind speed prediction, which is based on autoregression and fuzzy logic derivation of Takagi-Sugeno. The new model of wavelet transform has been developed, which makes it possible to include unnecessary noise from the model, as well as to reveal the cycling of the processes and their trend. It has been proved, that the proposed combination of methods can be used simultaneously to predict the power consumption and the wind power plant potential power at any time interval, depending on the planning horizon. The proposed models support a new scientific concept for the predictive control system of wind power stations and increase their degree integration into the electric power system.

  13. Energy accounting in nuclear power systems

    International Nuclear Information System (INIS)

    Symonds, J.L.; Essam, P.; Stocks, K.

    1976-01-01

    Energy analysis is a systematic way of tracing and accounting for the flows of energy through an industrial system and apportioning a quantity of the primary energy input to each of the goods and services sent out. The application of energy accounting to nuclear power stations and their growth in generating systems is discussed. Misunderstandings arising from discrepancies and weaknesses in some published simple analyses of hypothetical growth situations are outlined. Results of a more complex energy flow analysis are used to demonstrate that current nuclear energy programs are running at an energy profit. Large fossil fuel savings will occur in a real electrical grid system under anticipated nuclear power growth rates. These savings will give a new dimension in planning the use of fossil energy resources which will still be needed for transport and industrial processes, such as steelmaking, for some time to come. (author)

  14. Energy accounting in nuclear power systems

    International Nuclear Information System (INIS)

    Symonds, J.L.; Essam, P.; Stocks, K.

    1975-10-01

    Energy analysis is a systematic way of tracing and accounting for the flows of energy through an industrial system and apportioning a quantity of the primary energy input of the goods and services sent out. The application of energy accounting to nuclear power stations and their growth in generating systems is discussed. Misunderstandings arising from discrepancies and weaknesses in some published simple analyses of hypothetical growth situations are outlined. Results of a more complex energy flow analysis are used to demonstrate that current nuclear energy programs are running at an energy profit. Large fossil fuel savings will occur in a real electrical grid system under anticipated nuclear power growth rates. These savings will give a new dimension in planning the use of fossil energy resources which will still be needed for transport and industrial processes, such as steel-making, for some time to come. (author)

  15. An enhanced decision support technique under uncertainty to power system design evaluation

    International Nuclear Information System (INIS)

    Eskandar, H.; Asgharpoor, M.J.

    2001-10-01

    Multiple attribute decision making (Madam) methods have been widely used in power systems decision problems. This paper presents an enhanced Madam method to help decision makers (DMS) study the influencing factors in the design of power systems. In many Madam problems, however, the information available to the Dm is often imprecise due to the inaccurate measurements and inconsistent priority judgments. The proposed Madam methodology is based on the analytical hierarchy process (Ah) incorporated into the construction procedure of linear additive utility models to quantify the various divergences of opinions, practices and events that lead to confusion and uncertainties in planning. Such practice could help the Dm gain insight into how the imprecise data may affect their choice toward the best solution and how a set of acceptable alternatives may be identified with certain confidence. Sample case study in the design of a hybrid solar-wind power system is provided to illustrate the concepts introduced in this paper. Factors in planning the design of a hybrid solar-wind power system relate mainly to political and social conditions, and to technical advances and economics

  16. New information technologies in operative control of modes in regional electrical power systems

    OpenAIRE

    ANDREY D. TEVJASHEV; TATJANA B. TIMOFEEVA

    2003-01-01

    The problem of development of software for management of modes in electrical power systems in connection with casual character of a load in network is considered. The stochastic mathematical model of a system for operating control of modes in regional electrical power systems is offered. The methods for problem solving of operating control and operating planning of operational modes in regional electrical power systems are developed. The application of the developed models and methods will al...

  17. Energy Storage Applications in Power Systems with Renewable Energy Generation

    Science.gov (United States)

    Ghofrani, Mahmoud

    In this dissertation, we propose new operational and planning methodologies for power systems with renewable energy sources. A probabilistic optimal power flow (POPF) is developed to model wind power variations and evaluate the power system operation with intermittent renewable energy generation. The methodology is used to calculate the operating and ramping reserves that are required to compensate for power system uncertainties. Distributed wind generation is introduced as an operational scheme to take advantage of the spatial diversity of renewable energy resources and reduce wind power fluctuations using low or uncorrelated wind farms. The POPF is demonstrated using the IEEE 24-bus system where the proposed operational scheme reduces the operating and ramping reserve requirements and operation and congestion cost of the system as compared to operational practices available in the literature. A stochastic operational-planning framework is also proposed to adequately size, optimally place and schedule storage units within power systems with high wind penetrations. The method is used for different applications of energy storage systems for renewable energy integration. These applications include market-based opportunities such as renewable energy time-shift, renewable capacity firming, and transmission and distribution upgrade deferral in the form of revenue or reduced cost and storage-related societal benefits such as integration of more renewables, reduced emissions and improved utilization of grid assets. A power-pool model which incorporates the one-sided auction market into POPF is developed. The model considers storage units as market participants submitting hourly price bids in the form of marginal costs. This provides an accurate market-clearing process as compared to the 'price-taker' analysis available in the literature where the effects of large-scale storage units on the market-clearing prices are neglected. Different case studies are provided to

  18. Utilization of artificial intelligence techniques for the Space Station power system

    Science.gov (United States)

    Evatt, Thomas C.; Gholdston, Edward W.

    1988-01-01

    Due to the complexity of the Space Station Electrical Power System (EPS) as currently envisioned, artificial intelligence/expert system techniques are being investigated to automate operations, maintenance, and diagnostic functions. A study was conducted to investigate this technology as it applies to failure detection, isolation, and reconfiguration (FDIR) and health monitoring of power system components and of the total system. Control system utilization of expert systems for load scheduling and shedding operations was also researched. A discussion of the utilization of artificial intelligence/expert systems for Initial Operating Capability (IOC) for the Space Station effort is presented along with future plans at Rocketdyne for the utilization of this technology for enhanced Space Station power capability.

  19. Power system stabilizer control for wind power to enhance power system stability

    OpenAIRE

    Domínguez García, José Luís; Gomis Bellmunt, Oriol; Bianchi, Fernando Daniel; Sumper, Andreas

    2011-01-01

    The paper presents a small signal stability analysis for power systems with wind farm interaction. Power systems have damping oscillation modes that can be excited by disturbance or fault in the grid. The power converters of the wind farms can be used to reduce these oscillations and make the system more stable. These ideas are explored to design a power system stabilized (PSS) for a network with conventional generators and a wind farm in order to increase the damping of the oscillation...

  20. The evolution of industrial power monitoring and control systems

    Energy Technology Data Exchange (ETDEWEB)

    Nicholson, K. E.

    1998-04-01

    The evolution of power monitoring and control systems in industrial situations are described. Computer-based PMC (power monitoring and control) systems are discussed in two sections. Section 1 covers the PC/DOS based systems in use up to the 1990s. These systems had multitasking capability, sufficient for scanning a serial line running a multi-drop protocol to field instruments, which in turn were running either proprietary or PLC subsets, maintaining a level of operator display, data logging and query support. Since the mid-1990s the second generation of industrial power monitoring and control systems based on the PC/NT system came into use, driven to market by three factors: (1) availability of low cost PCs, (2) widespread availability of computer networking technologies, and (3) the appearance of the robust, industrially viable NT operating system. Second generation systems are characterized by division into two tiers; a monitoring system focused on remote metering, and a second tier of a modular system capable of fully implementing both power monitoring and supervisory control. Looking toward the future, the requirements for systems is expected to become more unique, driven by the need for information for energy procurement decision making, automatic control for integrating power acquisition from multiple suppliers, power capacity and integrated power and production control planning needs, and power quality and reliability issues. A review of the functionality of PMC systems, and system architectures was also provided. Results of a survey of PMC systems applications were also discussed. 2 refs., 4 tabs., 8 figs.

  1. Decommissioning plan of the nuclear-powered ship 'Mutsu'

    International Nuclear Information System (INIS)

    1992-01-01

    The nuclear-powered ship 'Mutsu' is to be decommissioned at Sekinehama Port immediately after finishing the experimental voyage based on the 'Fundamental plan on the research required for the development of nuclear ships in Japan Atomic Energy Research Institute' decided in March, 1985. The decommissioning plan which determines the methods of the works regarding the decommissioning and others is as follows. In order to utilize the ship hull of Mutsu, the reactor room including the reactor and shielding is removed in a lump, and the removal and isolation method of preserving it as it is on land is adopted. The measures for environment preservation and ensuring the safety of residents are taken, and the sufficient work control is carried out for preventing accidents and reducing the radiation exposure of workers. The ship is used as the ship with ordinary propulsion system for ocean research and the research and development of marine reactors. The utilization of Sekinehama and Ominato facilities is investigated. The reactor room removed from Mutsu is exhibited to public, being preserved safely in a building. (K.I.)

  2. Fiscal 2000 report on result of international joint demonstrative development of photovoltaic power generation system. Demonstrative research on photovoltaic power generation system interconnection system (Myanmar); 2000 nendo taiyoko hatsuden system kokusai kyodo jissho kaihatsu seika hokokusho. Taiyoko hatsuden keito renkei system jissho kenkyu (Myanmar)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Joint research was conducted with Myanmar on a photovoltaic power generation system interconnection system, for which fiscal 2000 results were described in this paper. Power generating facilities were set up consisting of 80kW photovoltaic, 40kW wind and 60kW diesel systems. With the photovoltaic and wind power generation connected to a small-scale power system as a ballast load, the system interconnection is formed through load adjusting equipment such as storage batteries. The hybrid system feeding is from 6 o'clock early in the morning until 23 late at night. The diesel power generation is free from restrictions. The operating method was set on system control (demand side management) by adjustment from the load side, with ballast load control employed that adjustably operates an ice machine load. The basic design was drafted in terms of a storage battery capacity of 1,000Ah and an ice machine load of 32kW. The daytime load was assumed to be 25% of the night load. On the equipment specifications set in this basic design, arrangement design was conducted for the equipment in the premises, making a land development plan and a basic construction plan including a temporary work site, construction steps, transportation and delivery of the equipment. Quantity of solar radiation and wind data were continuously observed. (NEDO)

  3. Nuclear renaissance in Asia. Energy security and development of nuclear power generation system

    International Nuclear Information System (INIS)

    Nakasugi, Hideo

    2009-01-01

    The energy policy and strategy of development of nuclear power generation system of China, India and Korea are stated on the basis of use of light water reactors (LWRs). The conditions of power generation and introduction plans of nuclear energy of other Asian countries such as Vietnam, Thailand, Indonesia, Malaysia and Philippines are described. The power plant capacity of China increased from 50,500 MW in 2004, to 65,000 MW in 2005, and the target value is 40,000 MW of operating nuclear plants and 18,000 MW in building in 2020. China is lagging behind in peaceful use of nuclear energy technologies. A plan for the reform of nuclear industry and nuclear power generation projects of China are summarized. Total power plant capacity of India is 145,000 MW, but the nuclear plant capacity is 4,120 MW in 2008 and 63,000 MW of the target in 2032. Development of nuclear power, circumstance, and cooperation with other countries' industries are explained. 17,716 MW of nuclear power is in operation, 6,800 MW in building and 2,800 MW in the planning stage in Korea. History of development of national reactors and the subjects of development of the fourth generation reactor of Korea are stated. Management system of nuclear power plants in China, technical bases of nuclear power plants in China, development system of nuclear power generation in India, the conditions of power production of Korea in 2008, the capacity factor of Korea, Japan and world from 1998 to 2008, and comparison of nuclear industries in China, India and Korea are illustrated. (S.Y.)

  4. Spatio-temporal modelling of electrical supply systems to optimize the site planning process for the "power to mobility" technology

    Science.gov (United States)

    Karl, Florian; Zink, Roland

    2016-04-01

    The transformation of the energy sector towards decentralized renewable energies (RE) requires also storage systems to ensure security of supply. The new "Power to Mobility" (PtM) technology is one potential solution to use electrical overproduction to produce methane for i.e. gas vehicles. Motivated by these fact, the paper presents a methodology for a GIS-based temporal modelling of the power grid, to optimize the site planning process for the new PtM-technology. The modelling approach is based on a combination of the software QuantumGIS for the geographical and topological energy supply structure and OpenDSS for the net modelling. For a case study (work in progress) of the city of Straubing (Lower Bavaria) the parameters of the model are quantified. The presentation will discuss the methodology as well as the first results with a view to the application on a regional scale.

  5. Stockholm Power Tech. Power systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The proceedings from this symposium is presented in six volumes: Invited speakers` sessions; Power systems; Power electronics; High-voltage technology; Electrical machines and drives; and Information and control systems. This report covers the power systems volume. Separate abstracts have been prepared for 141 of the 145 papers in this volume

  6. Stockholm Power Tech. Power systems

    International Nuclear Information System (INIS)

    1995-01-01

    The proceedings from this symposium is presented in six volumes: Invited speakers' sessions; Power systems; Power electronics; High-voltage technology; Electrical machines and drives; and Information and control systems. This report covers the power systems volume. Separate abstracts have been prepared for 141 of the 145 papers in this volume

  7. Radiological mapping of emergency planning zone of Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Pujari, R.N.; Saindane, Shashank; Narsaiah, M.V.R.; Solase, S.S.; Chaudbury, Probal; Kumar, Deepak; Gautam, Y.P.; Sharma, A.K.; Kumar, Avinash

    2016-01-01

    As a part of emergency preparedness programme, environmental radiation monitoring of Emergency Planning Zone (EPZ) (16 km radius) of Nuclear Power Plants (NPPs) is being carried out periodically. An environmental radiation monitoring of EPZ of Narora Atomic Power Station (NAPS) was carried out by installing various state-of-the-art mobile radiation monitoring systems in a vehicle and soil samples were collected from 40 locations. Around 200 important villages within EPZ were monitored and the radiological mapping of the monitored area is shown. The average dose rate recorded was 125 ± 28.8 nGy h -1 . Analysis of the collected dose rate data and the soil samples indicate normal background radiation level in the area

  8. Development of an Active Power Reserve Management Method for DC Applied Wave-Wind Combined Generation Systems

    Directory of Open Access Journals (Sweden)

    Seungmin Jung

    2015-11-01

    Full Text Available A system that combines a wind turbine and a wave generator can share the off-shore platform and therefore mix the advantages of the transmission system construction and the power conversion system. The current hybrid generation system considers output limitation according to the instructions of the transmission system operator (TSO, and controls the profile using wind turbine pitch control. However, the integrated wave generation system utilizing a DC network does not adapt a power limitation scheme due to its mechanical constraints. In this paper, a control plan focusing on the electrical section of wave generators is formed in order to effectively manage the output profile of the hybrid generation system. The plan pays attention to power reserve flexibility for the utility grid using the analysis of the controllable elements. Comparison with the existing system is performed based on real offshore conditions. With the help of power system computer aided design (PSCAD simulation, the ability of the novel technique is estimated by proposing the real power control based on the reference signal of TSO and the reactive power capacity it produces.

  9. Guidance for emergency planning in nuclear power plants; Vaegledning foer insatsplanering i kaerntekniska anlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Magnusson, Tommy; Ekdahl, Maria (Ringhals AB, Vaeroebacka (Sweden))

    2008-06-15

    Ringhals has been a model for this study, but the purpose has been to make the report applicable at all nuclear power plants in Sweden. The work has been done in close co-operation with the Swedish nuclear power plants and Rescue Services in the nuclear power municipalities Oesthammar, Oskarshamn, and Varberg. The internal fire brigade at the nuclear power plants has also been involved. A document will also be published as a further guidance at efforts of the type fires, which are mentioned in the enclosed document. After a fire in a switchgear room in 2005 the need of making the existing effort planning more effective at nuclear power plants was observed. The idea with the planning is to plan the effort in order to give the operational and emergency staff a good and actual support to come to a decision and to start the mission without delay. The risk information is showed by planning layouts, symbols and drawings as basis, give risk information and effort information. The effort information shows outer arrangements, manual action points, fire installations, passive fire safety etc. The risk information is shown by risk symbols. Their purpose is to give a fast overview of the existing risks. Reactor safety effects is the ruling influence if an effort has to be done in order to secure safety for a third person. In order to make an effort in an area personal risks for rescue staff, such as electricity risks, radiological risks, chemicals and gas bottles with compressed gases, has to be eliminated. For complicated missions detailed instructions are needed in order to handle specific risks. In a group discussion different people with pertinent knowledge has to value which problematic efforts need detailed instruction. Missions that have to be analyzed in a work group as above are: fire may affect the reactor safety, fire that may threaten the structural integrity, chemical discharge with big consequence on environment/third person and handling of gas system (compressed

  10. Clinical use of the hyperthermia treatment planning system HyperPlan to predict effectiveness and toxicity

    International Nuclear Information System (INIS)

    Sreenivasa, Geetha; Gellermann, Johanna; Rau, Beate; Nadobny, Jacek; Schlag, Peter; Deuflhard, Peter; Felix, Roland; Wust, Peter

    2003-01-01

    Purpose: The main aim is to prove the clinical practicability of the hyperthermia treatment planning system HyperPlan on a β-test level. Data and observations obtained from clinical hyperthermia are compared with the numeric methods FE (finite element) and FDTD (finite difference time domain), respectively. Methods and Materials: The planning system HyperPlan is built on top of the modular, object-oriented platform for visualization and model generation AMIRA. This system already contains powerful algorithms for image processing, geometric modeling, and three-dimensional graphics display. A number of hyperthermia-specific modules are provided, enabling the creation of three-dimensional tetrahedral patient models suitable for treatment planning. Two numeric methods, FE and FDTD, are implemented in HyperPlan for solving Maxwell's equations. Both methods base their calculations on segmented (contour based) CT or MR image data. A tetrahedral grid is generated from the segmented tissue boundaries, consisting of approximately 80,000 tetrahedrons per patient. The FE method necessitates, primarily, this tetrahedral grid for the calculation of the E-field. The FDTD method, on the other hand, calculates the E-field on a cubical grid, but also requires a tetrahedral grid for correction at electrical interfaces. In both methods, temperature distributions are calculated on the tetrahedral grid by solving the bioheat transfer equation with the FE method. Segmentation, grid generation, E-field, and temperature calculation can be carried out in clinical practice at an acceptable time expenditure of about 1-2 days. Results: All 30 patients we analyzed with cervical, rectal, and prostate carcinoma exhibit a good correlation between the model calculations and the attained clinical data regarding acute toxicity (hot spots), prediction of easy-to-heat or difficult-to-heat patients, and the dependency on various other individual parameters. We could show sufficient agreement between

  11. A transeuropean project ICOP-DISS-2140 dealing with the use of energy storage in power systems

    International Nuclear Information System (INIS)

    Feser, K.; Hadjsaid, N.; Herlander, K.; Nazarko, J.; Prochovnik, A.; Stroev, V.; Styczynski, Z.; Vale, A.; Voropai, N.

    1998-01-01

    In the early 90s economic crisis led to the reduction of electric power and energy consumption growth in the West. The political transformation in the East caused significant evolution of the power system structures (e.g. deregulation). Changes of dynamic and static conditions in the electric power systems have been observed. In the last 5-6 years an unexpected low load growth complicated optimal expansion planning for distribution and transmission networks in power systems. Besides intelligent planning, a delay of a necessary network investment (e.g. cable lines) using some distributed small size storage can be obtained. In this way the risk of wrong investments can be minimised. In the East, using energy storage can also provide additional assistance by improving the quality of energy in distribution systems. For two years, the European Community sponsored an international project ''Intelligent Computation and Simulation in Planning and Operation of Power System taking into Account Energy Storage'', in the scope of the INCO-Copernicus program. Eight partners from six countries (Germany - coordination, Russia, Ukraine, Poland, France and Portugal) took as a goal to use ''synergy effects'' by developing a common base for a future battery storage demonstration facility. (author)

  12. Evaluation of the prompt alerting systems at four nuclear power stations

    International Nuclear Information System (INIS)

    Towers, D.A.; Anderson, G.S.; Keast, D.N.; Kenoyer, J.L.; Desrosiers, A.E.

    1982-09-01

    This report presents evaluations of the prompt notification siren systems at the following four US nuclear power facilities: Trojan, Three Mile Island, Indian Point, and Zion. The objective of these evaluations was to provide examples of an analytical procedure for predicting siren-system effectiveness under specific conditions in the 10-mile emergency planning zone (EPZ) surrounding nuclear power plants. This analytical procedure is discussed in report No. PNL-4227

  13. The Need for Strategic Planning for Nuclear Power Plant I and C Upgrades

    International Nuclear Information System (INIS)

    Hill, J. Douglas; Moore, Paul

    2002-01-01

    Nuclear power plants rely on Instrumentation and Control (I and C) systems for control, monitoring and protection of the plant. The original, analog designs used in most nuclear plants have become or soon will be obsolete, forcing plants to turn to digital technology. Many factors affect the design of replacement equipment, including long-term and short-term economics, regulatory issues, and the way the plant operates on a day-to-day basis. The first step to all modernization projects should involve strategic planning, to ensure that the overall long and short-term goals of the plant are met. Strategic planning starts with a thorough evaluation of the existing plant control systems, the available options, and the benefits and consequences of these options. (authors)

  14. Fuzzy-TLBO optimal reactive power control variables planning for energy loss minimization

    International Nuclear Information System (INIS)

    Moghadam, Ahmad; Seifi, Ali Reza

    2014-01-01

    Highlights: • A new approach to the problem of optimal reactive power control variables planning is proposed. • The energy loss minimization problem has been formulated by modeling the load of system as a Load Duration Curve. • To solving the energy loss problem, the classic methods and the evolutionary methods are used. • A new proposed fuzzy teaching–learning based algorithm is applied to energy loss problem. • Simulations are done to show the effectiveness and superiority of the proposed algorithm compared with other methods. - Abstract: This paper offers a new approach to the problem of optimal reactive power control variables planning (ORPVCP). The basic idea is division of Load Duration Curve (LDC) into several time intervals with constant active power demand in each interval and then solving the energy loss minimization (ELM) problem to obtain an optimal initial set of control variables of the system so that is valid for all time intervals and can be used as an initial operating condition of the system. In this paper, the ELM problem has been solved by the linear programming (LP) and fuzzy linear programming (Fuzzy-LP) and evolutionary algorithms i.e. MHBMO and TLBO and the results are compared with the proposed Fuzzy-TLBO method. In the proposed method both objective function and constraints are evaluated by membership functions. The inequality constraints are embedded into the fitness function by the membership function of the fuzzy decision and the problem is modeled by fuzzy set theory. The proposed Fuzzy-TLBO method is performed on the IEEE 30 bus test system by considering two different LDC; and it is shown that using this method has further minimized objective function than original TLBO and other optimization techniques and confirms its potential to solve the ORPCVP problem with considering ELM as the objective function

  15. Towards 100% renewable energy systems: Uncapping power system flexibility

    International Nuclear Information System (INIS)

    Papaefthymiou, G.; Dragoon, Ken

    2016-01-01

    Relying almost entirely on energy from variable renewable resources such as wind and solar energy will require a transformation in the way power systems are planned and operated. This paper outlines the necessary steps in creating power systems with the flexibility needed to maintain stability and reliability while relying primarily on variable energy resources. These steps are provided in the form of a comprehensive overview of policies, technical changes, and institutional systems, organized in three development phases: an initial phase (penetration up to about 10%) characterized by relatively mild changes to conventional power system operations and structures; a dynamic middle phase (up to about 50% penetration) characterized by phasing out conventional generation and a concerted effort to wring flexibility from existing infrastructure; and the high penetration phase that inevitably addresses how power systems operate over longer periods of weeks or months when variable generation will be in either short supply, or in over-abundance. Although this transition is likely a decades-long and incremental process and depends on the specifics of each system, the needed policies, research, demonstration projects and institutional changes need to start now precisely because of the complexity of the transformation. The list of policy actions presented in this paper can serve as a guideline to policy makers on effectuating the transition and on tracking the preparedness of systems. - Highlights: •100% VRES systems: combined analysis of all related technical and policy challenges. •Transition elements: classification of the complete range of challenges in 9 elements. •Development regimes: policy actions in 3 VRES penetration regimes (low-medium-high). •Policies: comprehensive guideline and detailed presentation of policies per regime. •Roadmap: lists of actions per regime act as transition roadmap to 100% VRES systems.

  16. The Expert System Application For Inspection Of The Power Plants

    International Nuclear Information System (INIS)

    Josowidagdo, L.

    1997-01-01

    This paper describes the application of expert system to evaluate and consider the problem encountered in this fields are complex and time consuming. As as example several factors affecting system voltage selections are load magnitude, distance from the main power supply, safety, standards, cost of utilization and service system equipment, and future load growth. The inspection deal with interactions between alternatives, uncertainties, and important non financial parameter. Several complex problems are multiple objective functions, multiple constraints, complex system interactions, the need for accuracy, the need for trade off, optimization, and coordination of the decision making process. ASDEP is one of the expert system for electric power plant design that describe the application of the artificial intelligence to design of a power plan's electrical auxiliary system. In this circumstance this paper will elaborate another aspect for using the expert system in the inspection

  17. Load Flow and Short Circuit Analysis of the Class III Power System of HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Kim, H. K.; Jung, H. S

    2005-12-15

    The planning, design, and operation of electric power system require engineering studies to assist in the evaluation of the system performance, reliability, safety and economics. The Class III power of HANARO supplies power for not only HANARO but also RIPF and IMEF. The starting current of most ac motors is five to ten times normal full load current. The loads of the Class III power are connected in consecutive orders at an interval for 10 seconds to avoid excessive voltage drop. This technical report deals with the load flow study and motor starting study for the Class III power of HANARO using ETAP(Electrical Transient Analyzer Program) to verify the capacity of the diesel generator. Short-circuit studies are done to determine the magnitude of the prospective currents flowing throughout the power system at various time intervals after a fault occurs. Short-circuit studies can be performed at the planning stage in order to help finalize the system layout, determine voltage levels, and size cables, transformers, and conductors. From this study, we verify the short circuit current capacity of air circuit breaker(ACB) and automatic transfer switch(ATS) of the Class III power.

  18. Sustainable Development of Regional Power Systems and the Consumption of Electric Energy

    Directory of Open Access Journals (Sweden)

    Evgeny Lisin

    2018-04-01

    Full Text Available Nowadays, one of the most imminent problems facing power systems in post-industrial countries is the sustainable development of power systems under conditions of increasing power consumption irregularity due to the reduction of the industry’s share in consumers’ demand for electric power. In today’s Russia, this issue is becoming very acute due to the significant share of electric power and heat co-generation that is demonstrating low manoeuvrability and poor adaptation to operations in the daily variation of electric power demand. This paper considers the problem of improving the power system steady-state through the optimization of the production structure of thermal power plants. We propose a combinatorial algorithm that improves the planning of the structural and technological modernization of the power equipment configuration, with a glance at the forecast of the increasing irregularity of power consumption.

  19. A Real-Coded Genetic Algorithm with System Reduction and Restoration for Rapid and Reliable Power Flow Solution of Power Systems

    Directory of Open Access Journals (Sweden)

    Hassan Abdullah Kubba

    2015-05-01

    Full Text Available The paper presents a highly accurate power flow solution, reducing the possibility of ending at local minima, by using Real-Coded Genetic Algorithm (RCGA with system reduction and restoration. The proposed method (RCGA is modified to reduce the total computing time by reducing the system in size to that of the generator buses, which, for any realistic system, will be smaller in number, and the load buses are eliminated. Then solving the power flow problem for the generator buses only by real-coded GA to calculate the voltage phase angles, whereas the voltage magnitudes are specified resulted in reduced computation time for the solution. Then the system is restored by calculating the voltages of the load buses in terms of the calculated voltages of the generator buses, after a derivation of equations for calculating the voltages of the load busbars. The proposed method was demonstrated on 14-bus IEEE test systems and the practical system 362-busbar IRAQI NATIONAL GRID (ING. The proposed method has reliable convergence, a highly accurate solution and less computing time for on-line applications. The method can conveniently be applied for on-line analysis and planning studies of large power systems.

  20. Manager's assistant systems for space system planning

    Science.gov (United States)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  1. Development of advanced methods for planning electric energy distribution systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goenen, T.; Foote, B.L.; Thompson, J.C.; Fagan, J.E.

    1979-10-01

    An extensive search was made for the identification and collection of reports published in the open literature which describes distribution planning methods and techniques. In addition, a questionnaire has been prepared and sent to a large number of electric power utility companies. A large number of these companies were visited and/or their distribution planners interviewed for the identification and description of distribution system planning methods and techniques used by these electric power utility companies and other commercial entities. Distribution systems planning models were reviewed and a set of new mixed-integer programming models were developed for the optimal expansion of the distribution systems. The models help the planner to select: (1) optimum substation locations; (2) optimum substation expansions; (3) optimum substation transformer sizes; (4) optimum load transfers between substations; (5) optimum feeder routes and sizes subject to a set of specified constraints. The models permit following existing right-of-ways and avoid areas where feeders and substations cannot be constructed. The results of computer runs were analyzed for adequacy in serving projected loads within regulation limits for both normal and emergency operation.

  2. An examination of isolated, stationary, hydrogen power systems supplied by renewables: component and system issues and criteria necessary for successful worldwide deployment

    Energy Technology Data Exchange (ETDEWEB)

    Rambach, G. D. [Energy and Environmental Engineering Center, Desert Research Institute, Reno, NV (United States)

    1999-12-01

    The premise of this paper is that remote, stationary power systems, based on indigenous renewable energy sources, are an ideal market entry opportunity for hydrogen, but that the deployment of isolated power systems relying on hydrogen as the energy storage medium requires complex and comprehensive planning and design considerations to provide for successful market entry strategies and appropriate systems engineering. Accordingly, this paper sets out to discuss the criteria and the framework necessary to determine how to successfully deploy any specific system or to plan a global marketing strategy. Details of the indigenous intermittent energy sources (wind turbines, solar photovoltaic, micro-hydroelectric, etc), primary power-to-hydrogen conversion systems, hydrogen storage methods, and hydrogen-to-electricity conversion systems (hydrogen-internal combustion engine generator set, hydrogen fuel cells) are described, along with the criteria for technically and commercially successful deployment of any renewable utility power system that employs energy storage.2 refs., 4 figs.

  3. Computer aided construction engineering system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Nakajima, Akira; Miyahara, Ryohei; Miura, Jun

    1990-01-01

    The construction CAE system for nuclear power plants is the tool for the construction work simulator (procedure, processes and management simulation) connected to 3D-CAD (three-dimensional plant layout planning CAD). The data used for construction work simulation are registered in the data base as the installation smallest unit data from the 3D-CAD. This construction work simulator comprises the automatic installation procedure decision system, with which a construction planner decides installation procedure by using a high performance graphic work station, and based on a 3D-CAD model, utilizing empirical procedure logic, the dialogue system for making the installation procedure more optimal by utilizing effectively the graphic function, the evaluation system for synthetically evaluating workability, personnel plan and so on by adding the simulation of human behavior based on these procedures, the schedule system which carries out work process simulation based on the above, the data base system for letting to do these plans effectively and the project management system. By means of these, the plant construction of high quality is expected. (K.I.)

  4. Offshore wind power - Possibilities and shortcomings in the planning and design; Vindkraft till havs - Moejligheter och brister vid planering och projektering

    Energy Technology Data Exchange (ETDEWEB)

    Andre, Daniel

    2010-02-15

    The purpose of this report is to examine how the planning preparedness offshore unfolds. Planning conditions of municipalities have been investigated through interviews with municipal planners and representatives of the wind power stakeholders. At the same time, the problems and deficiencies that impede the expansion of offshore wind power have been identified. In the report, based on the survey of the state of planning, as well as the shortcomings of current systems, the Swedish National Board of Housing, Building and Planning presents opportunities for improvements. With these proposals the Swedish National Board of Housing, Building and Planning opens up for an increased cooperation with the aim to facilitate a future expansion of offshore wind power. The report primarily addresses central government agencies and authorities, county councils, as well as planners or other officers of the national, regional and municipal levels

  5. 3D treatment planning systems.

    Science.gov (United States)

    Saw, Cheng B; Li, Sicong

    2018-01-01

    Three-dimensional (3D) treatment planning systems have evolved and become crucial components of modern radiation therapy. The systems are computer-aided designing or planning softwares that speed up the treatment planning processes to arrive at the best dose plans for the patients undergoing radiation therapy. Furthermore, the systems provide new technology to solve problems that would not have been considered without the use of computers such as conformal radiation therapy (CRT), intensity-modulated radiation therapy (IMRT), and volumetric modulated arc therapy (VMAT). The 3D treatment planning systems vary amongst the vendors and also the dose delivery systems they are designed to support. As such these systems have different planning tools to generate the treatment plans and convert the treatment plans into executable instructions that can be implemented by the dose delivery systems. The rapid advancements in computer technology and accelerators have facilitated constant upgrades and the introduction of different and unique dose delivery systems than the traditional C-arm type medical linear accelerators. The focus of this special issue is to gather relevant 3D treatment planning systems for the radiation oncology community to keep abreast of technology advancement by assess the planning tools available as well as those unique "tricks or tips" used to support the different dose delivery systems. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  6. A cooperative game theory approach to transmission planning in power systems

    Science.gov (United States)

    Contreras, Javier

    The rapid restructuring of the electric power industry from a vertically integrated entity into a decentralized industry has given rise to complex problems. In particular, the transmission component of the electric power system requires new methodologies to fully capture this emerging competitive industry. Game theory models are used to model strategic interactions in a competitive environment. This thesis presents a new decentralized framework to study the transmission network expansion problem using cooperative game theory. First, the players and the rules of the game are defined. Second, a coalition formation scheme is developed. Finally, the optimized cost of expansion is allocated based on the history of the coalition formation.

  7. Quantifying the increasing sensitivity of power systems to climate variability

    Science.gov (United States)

    Bloomfield, H. C.; Brayshaw, D. J.; Shaffrey, L. C.; Coker, P. J.; Thornton, H. E.

    2016-12-01

    Large quantities of weather-dependent renewable energy generation are expected in power systems under climate change mitigation policies, yet little attention has been given to the impact of long term climate variability. By combining state-of-the-art multi-decadal meteorological records with a parsimonious representation of a power system, this study characterises the impact of year-to-year climate variability on multiple aspects of the power system of Great Britain (including coal, gas and nuclear generation), demonstrating why multi-decadal approaches are necessary. All aspects of the example system are impacted by inter-annual climate variability, with the impacts being most pronounced for baseload generation. The impacts of inter-annual climate variability increase in a 2025 wind-power scenario, with a 4-fold increase in the inter-annual range of operating hours for baseload such as nuclear. The impacts on peak load and peaking-plant are comparably small. Less than 10 years of power supply and demand data are shown to be insufficient for providing robust power system planning guidance. This suggests renewable integration studies—widely used in policy, investment and system design—should adopt a more robust approach to climate characterisation.

  8. Electric power systems

    CERN Document Server

    Weedy, B M; Jenkins, N; Ekanayake, J B; Strbac, G

    2012-01-01

    The definitive textbook for Power Systems students, providing a grounding in essential power system theory while also focusing on practical power engineering applications. Electric Power Systems has been an essential book in power systems engineering for over thirty years. Bringing the content firmly up-to-date whilst still retaining the flavour of Weedy's extremely popular original, this Fifth Edition has been revised by experts Nick Jenkins, Janaka Ekanayake and Goran Strbac. This wide-ranging text still covers all of the fundamental power systems subjects but is now e

  9. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  10. The flow measurement plan for the primary system of SMART

    International Nuclear Information System (INIS)

    Lee, Jun; Seo, J. K.; Park, C. T.; Yoon, J. H.; Cho, B. H.; Lee, D. J.

    2001-08-01

    It is the common features of the integrated reactor that the main components of the primary system are installed within the reactor vessel, and so there are no any flow pipes connecting the reactor coolant pumps or steam generators. Due to no any flow pipes, it is impossible to measure the differential pressure at the primary system of the integrated reactor, and it also makes impossible measure the primary coolant flow rate. SMART is also a integrated reactor type, and have a problem as same as the above case. The objective of the study is to draw up the flow measurement plan for the primary system of SMART. In this study, firstly we reviewed the flow measurement methods at the primary system for the existing commercial nuclear power reactors. As a result of the review, we selected preliminarily the 3 methods which is a good possibility of application to SMART. The 3 methods are as follows. Flow measurement method by MCP rotation speed, flow measurement method by HBM, flow measurement method by pump motor power. For the above methods, we have evaluated whether they actually can be applied to SMART, and also have set up the concrete methodology. Finally we have made a selection of the above methods as the flow measurement plan for the primary system of SMART. Peculiarly, we did not found out a precedent which the direct pump motor power-flow rate curve is used as the flow measurement method in the existing commercial nuclear power reactors. Therefore, to use this method for SMART, it is needed to bear the follow-up measures in mind. The follow-up measures is included in this report

  11. System safety program plan for the Isotope Brayton Ground Demonstration System (phase I)

    International Nuclear Information System (INIS)

    1976-01-01

    The safety engineering effort to be undertaken in achieving an acceptable level of safety in the Brayton Isotope Power System (BIPS) development program is discussed. The safety organizational relationships, the methods to be used, the tasks to be completed, and the documentation to be published are described. The plan will be updated periodically as the need arises

  12. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  13. Bulk electric system reliability evaluation incorporating wind power and demand side management

    Science.gov (United States)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed

  14. Dynamic Optimal Energy Flow in the Integrated Natural Gas and Electrical Power Systems

    DEFF Research Database (Denmark)

    Fang, Jiakun; Zeng, Qing; Ai, Xiaomeng

    2018-01-01

    . Simulation on the test case illustrates the success of the modelling and the beneficial roles of the power-to-gas are analyzed. The proposed model can be used in the decision support for both planning and operation of the coordinated natural gas and electrical power systems.......This work focuses on the optimal operation of the integrated gas and electrical power system with bi-directional energy conversion. Considering the different response times of the gas and power systems, the transient gas flow and steady- state power flow are combined to formulate the dynamic...... optimal energy flow in the integrated gas and power systems. With proper assumptions and simplifications, the problem is transformed into a single stage linear programming. And only a single stage linear programming is needed to obtain the optimal operation strategy for both gas and power systems...

  15. Implementing agreement on photovoltaic power systems - Annual report 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2009. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented, as are activities planned for 2010. The tasks include the exchange and dissemination of information on photovoltaic power systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries, urban-scale PV applications, hybrid systems within mini-grids, PV environmental health and safety activities, performance and reliability of PV systems and high penetration PV in electricity grids. The status and prospects in the 23 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the performance, reliability and analysis of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  16. Proceedings of the 9. IASTED international conference on power and energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Domijan, A.Jr. [Univ. of South Florida, Tampa, FL (United States)

    2007-07-01

    This conference provided an international forum for researchers and practitioners to exchange ideas and practical experience in the field of energy and power systems. The purpose was to strengthen relations between the energy sector, research laboratories and universities. Discussions focused on reliability issues in the next generation of power systems. Environmental factors and customer concerns regarding power quality issues were noted as the driving force for new concepts in electricity demand. Global and regional energy challenges ranging from energy production to power delivery were also discussed. The sessions of the conference were entitled: power system planning, investment, real time management and operations; infrastructure, reliability and weather effects; alternate energy developments and sustainability using biomass, solar and other renewable energy sources; modelling power systems, demand response and end use, and tariff issues; power quality, filtering, and experimental performance evaluations; forecasting computational methods and electronics; distribution system issues, microturbines and microgrids; and, nuclear power plants, modelling and evaluation of energy systems. All 72 presentations were catalogued separately for inclusion in this database. refs., tabs., figs.

  17. Proceedings of the 9. IASTED international conference on power and energy systems

    International Nuclear Information System (INIS)

    Domijan, A.Jr.

    2007-01-01

    This conference provided an international forum for researchers and practitioners to exchange ideas and practical experience in the field of energy and power systems. The purpose was to strengthen relations between the energy sector, research laboratories and universities. Discussions focused on reliability issues in the next generation of power systems. Environmental factors and customer concerns regarding power quality issues were noted as the driving force for new concepts in electricity demand. Global and regional energy challenges ranging from energy production to power delivery were also discussed. The sessions of the conference were entitled: power system planning, investment, real time management and operations; infrastructure, reliability and weather effects; alternate energy developments and sustainability using biomass, solar and other renewable energy sources; modelling power systems, demand response and end use, and tariff issues; power quality, filtering, and experimental performance evaluations; forecasting computational methods and electronics; distribution system issues, microturbines and microgrids; and, nuclear power plants, modelling and evaluation of energy systems. All 72 presentations were catalogued separately for inclusion in this database. refs., tabs., figs

  18. PowerFactory applications for power system analysis

    CERN Document Server

    Gonzalez-Longatt, Francisco

    2014-01-01

    This book presents a comprehensive set of guidelines and applications of DIgSILENT PowerFactory, an advanced power system simulation software package, for different types of power systems studies. Written by specialists in the field, it combines expertise and years of experience in the use of DIgSILENT PowerFactory with a deep understanding of power systems analysis. These complementary approaches therefore provide a fresh perspective on how to model, simulate and analyse power systems. It presents methodological approaches for modelling of system components, including both classical and non-

  19. Intelligent operation system for nuclear power plants

    International Nuclear Information System (INIS)

    Morioka, Toshihiko; Fukumoto, Akira; Suto, Osamu; Naito, Norio.

    1987-01-01

    Nuclear power plants consist of many systems and are operated by skillful operators with plenty of knowledge and experience of nuclear plants. Recently, plant automation or computerized operator support systems have come to be utilized, but the synthetic judgment of plant operation and management remains as human roles. Toshiba is of the opinion that the activities (planning, operation and maintenance) should be integrated, and man-machine interface should be human-friendly. We have begun to develop the intelligent operation system aiming at reducing the operator's role within the fundamental judgment through the use of artificial intelligence. (author)

  20. Preliminary Findings of the South Africa Power System Capacity Expansion and Operational Modelling Study: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Reber, Timothy J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Chartan, Erol Kevin [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Brinkman, Gregory L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-01

    Wind and solar power contract prices have recently become cheaper than many conventional new-build alternatives in South Africa and trends suggest a continued increase in the share of variable renewable energy (vRE) on South Africa's power system with coal technology seeing the greatest reduction in capacity, see 'Figure 6: Percentage share by Installed Capacity (MW)' in [1]. Hence it is essential to perform a state-of-the-art grid integration study examining the effects of these high penetrations of vRE on South Africa's power system. Under the 21st Century Power Partnership (21CPP), funded by the U.S. Department of Energy, the National Renewable Energy Laboratory (NREL) has significantly augmented existing models of the South African power system to investigate future vRE scenarios. NREL, in collaboration with Eskom's Planning Department, further developed, tested and ran a combined capacity expansion and operational model of the South African power system including spatially disaggregated detail and geographical representation of system resources. New software to visualize and interpret modelling outputs has been developed, and scenario analysis of stepwise vRE build targets reveals new insight into associated planning and operational impacts and costs. The model, built using PLEXOS, is split into two components, firstly a capacity expansion model and secondly a unit commitment and economic dispatch model. The capacity expansion model optimizes new generation decisions to achieve the lowest cost, with a full understanding of capital cost and an approximated understanding of operational costs. The operational model has a greater set of detailed operational constraints and is run at daily resolutions. Both are run from 2017 through 2050. This investigation suggests that running both models in tandem may be the most effective means to plan the least cost South African power system as build plans seen to be more expensive than optimal by the

  1. Determination of the Level of Influence of Various Factors on the Reliability of Power System

    Directory of Open Access Journals (Sweden)

    Victor Popescu

    2014-09-01

    Full Text Available Consumers supply with qualitative electric power is one of the priority requirements imposed to power systems. Currently, in electricity networks take place a number of planned and unplanned disconnections, which interrupt the power and affect consumers, causing economic damage. To ensure the quality of power supply it is essential to know the factors that influence the reliability of power systems, which have a visible impact on the variation of reliability of equipment installed in power systems. This paper is devoted to problems of calculation and analysis of power systems reliability and estimation of the impact of various factors that influence the supply of consumers.

  2. Power system relaying

    CERN Document Server

    Horowitz, Stanley H; Niemira, James K

    2013-01-01

    The previous three editions of Power System Relaying offer comprehensive and accessible coverage of the theory and fundamentals of relaying and have been widely adopted on university and industry courses worldwide. With the third edition, the authors have added new and detailed descriptions of power system phenomena such as stability, system-wide protection concepts and discussion of historic outages. Power System Relaying, 4th Edition continues its role as an outstanding textbook on power system protection for senior and graduate students in the field of electric power engineering and a refer

  3. System Integration of Distributed Power for Complete Building Systems: Phase 2 Report

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, R.

    2003-12-01

    This report describes NiSource Energy Technologies Inc.'s second year of a planned 3-year effort to advance distributed power development, deployment, and integration. Its long-term goal is to design ways to extend distributed generation into the physical design and controls of buildings. NET worked to meet this goal through advances in the implementation and control of combined heat and power systems in end-user environments and a further understanding of electric interconnection and siting issues. The specific objective of work under this subcontract is to identify the system integration and implementation issues of DG and develop and test potential solutions to these issues. In addition, recommendations are made to resolve identified issues that may hinder or slow the integration of integrated energy systems into the national energy picture.

  4. An integrated reliability management system for nuclear power plants

    International Nuclear Information System (INIS)

    Kimura, T.; Shimokawa, H.; Matsushima, H.

    1998-01-01

    The responsibility in the nuclear field of the Government, utilities and manufactures has increased in the past years due to the need of stable operation and great reliability of nuclear power plants. The need to improve the reliability is not only for the new plants but also for those now running. So, several measures have been taken to improve reliability. In particular, the plant manufactures have developed a reliability management system for each phase (planning, construction, maintenance and operation) and these have been integrated as a unified system. This integrated reliability management system for nuclear power plants contains information about plant performance, failures and incidents which have occurred in the plants. (author)

  5. Stochastic Programming for Fuel Supply Planning of Combined Heat and Power Plants

    DEFF Research Database (Denmark)

    Guericke, Daniela; Blanco, Ignacio; Morales González, Juan Miguel

    The consumption of biomass to produce power and heat has increased due to the carbon neutral policies. Combined heat and power (CHP) plants often combine biomass with other fuels, e.g., natural gas. The negotiation process for supply contracts involves many uncertainties due to the long planning...... horizon. The demand for biomass is uncertain, and heat demand and electricity prices vary during the planning period. We propose a method using stochastic optimization to support the biomass and natural gas supply planning for CHP plants including short-term decisions for optimal market participation....

  6. Large-scale integration of wind power into the existing Chinese energy system

    DEFF Research Database (Denmark)

    Liu, Wen; Lund, Henrik; Mathiesen, Brian Vad

    2011-01-01

    stability, the maximum feasible wind power penetration in the existing Chinese energy system is approximately 26% from both technical and economic points of view. A fuel efficiency decrease occurred when increasing wind power penetration in the system, due to its rigid power supply structure and the task......This paper presents the ability of the existing Chinese energy system to integrate wind power and explores how the Chinese energy system needs to prepare itself in order to integrate more fluctuating renewable energy in the future. With this purpose in mind, a model of the Chinese energy system has...... been constructed by using EnergyPLAN based on the year 2007, which has then been used for investigating three issues. Firstly, the accuracy of the model itself has been examined and then the maximum feasible wind power penetration in the existing energy system has been identified. Finally, barriers...

  7. Wind power in modern power systems

    DEFF Research Database (Denmark)

    Chen, Zhe

    2013-01-01

    In recent years, wind power is experiencing a rapid growth, and large-scale wind turbines/wind farms have been developed and connected to power systems. However, the traditional power system generation units are centralized located synchronous generators with different characteristics compared...... with wind turbines. This paper presents an overview of the issues about integrating large-scale wind power plants into modern power systems. Firstly, grid codes are introduced. Then, the main technical problems and challenges are presented. Finally, some possible technical solutions are discussed....

  8. Power system analysis of Hanlim superconducting HVDC system using real time digital simulator

    Science.gov (United States)

    Won, Y. J.; Kim, J. G.; Kim, A. R.; Kim, G. H.; Park, M.; Yu, I. K.; Sim, K. D.; Cho, J.; Lee, S.; Jeong, K. W.; Watanabe, K.

    2011-11-01

    Jeju island is located approximately 100 km south from the mainland of Korea, and had a peak load of about 553 MW in 2008. The demand increases 7.2% a year over the last 5 years. Since the wind profiles of Jeju island are more favorable than mainland of Korea, many companies have shown interest in the wind power business at the Jeju island. Moreover KEPCO has a plan for renewable energy test too whose power will be delivered by HVDC system. One kilometer length of total 8 km was designed as superconducting DC cable. Rest 7 km will be the conventional overhead line. In this paper, the authors have developed a simulation model of the power network around 8 km HVDC system using real time digital simulator (RTDS).

  9. Systemic Planning: Dealing with Complexity by a Wider Approach to Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    2005-01-01

    and methodology that can be helpful for planning under circumstances characterised by complexity and uncertainty. It is argued that compared to conventional, planning – referred to as systematic planning - there is a need for a wider, more systemic approach to planning that is better suited to current real......On the basis of a new book Systemic Planning this paper addresses systems thinking and complexity in a context of planning. Specifically, renewal of planning thinking on this background is set out as so-called systemic planning (SP). The principal concern of SP is to provide principles...

  10. British and Italian electric power systems: Comparative study

    International Nuclear Information System (INIS)

    Lolli, A.

    1992-01-01

    This study compares the new electricity system in England, Wales and Scotland, after the 1989 Electricity Act, and the Italian electricity system (as modified by the January, 9, 1991, Law No. 9 and by the December 5, 1991, Decree No. 386 made law (No. 35) on January, 29, 1992). The study focuses on legal aspects and socio-economic factors influencing planning and organizing by the national electric power industries in their efforts to maintain supply and demand equilibrium

  11. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  12. An effective heuristic for combined heat-and-power production planning with power ramp constraints

    International Nuclear Information System (INIS)

    Rong, Aiying; Lahdelma, Risto

    2007-01-01

    Combined heat-and-power (CHP) production is an increasingly important technology for its efficient utilization of primary-energy resources and for reducing CO 2 emissions. In the CHP plant, the generation of heat-and-power follows a joint characteristic, which makes the determination of both the marginal power production cost (MPPC) and the feasible operating region for the plant more complicated than for the power-only generation plant. Due to the interdependence between heat and power production, the power-ramp constraints, which limit how much the power production of a CHP plant may increase or decrease between two successive periods, may also imply constraints on the heat production. In this paper, we investigate the impact of power-ramp constraints on CHP production planning and develop a robust heuristic for dealing with the power-ramp constraints based on the solution to the problem with relaxed ramp-constraints (RRC). Numerical results based on realistic production models show that the heuristic can generate high-quality solutions efficiently. (author)

  13. Verification and validation of the safety parameter display system for nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Yuanfang

    1993-05-01

    During the design and development phase of the safety parameter display system for nuclear power plant, a verification and validation (V and V) plan has been implemented to improve the quality of system design. The V and V activities are briefly introduced, which were executed in four stages of feasibility research, system design, code development and system integration and regulation. The evaluation plan and the process of implementation as well as the evaluation conclusion of the final technical validation for this system are also presented in detail

  14. Relationship between regional planning and site finding of power stations with regard to energy supply

    International Nuclear Information System (INIS)

    Hoppe, I.

    1980-01-01

    Based on the discussion on energy policy generally brought in the fore, spatial relationships are discussed especially in the field of electricity supply. A review is given of the legal systematism in which electricity supply and regional planning are to be found. How state planners organize the provision with sites for high-capacity thermal power stations is described as the concrete development of systematic legal relationships, concepts of, and opportunities for, state and regional planning. In the main part, this paper focusses on the analysis of the course of development power station construction and the distribution system have taken with regard to the question as to whether and to what extent this technological character is also responsible for an emerging structure in which these plants are mainly centred in a special region. (orig.) [de

  15. Powering the people: India's capacity expansion plans

    Energy Technology Data Exchange (ETDEWEB)

    Patel, S.

    2009-05-15

    India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

  16. The socio-economic costs of the planned development of wind power energy

    International Nuclear Information System (INIS)

    Bentzen, J.

    1992-01-01

    The socio-economic consequences of the Danish government's planned further development of wind power energy are discussed in detail. It is claimed that, currently, electricity produced by wind turbines is more expensive than that produced by power stations, if the relative environmental effects are not taken into consideration. It is expected that technological development will contribute to cost reduction by the year 2010 so that electricity produced by wind turbines will be competitive, but until then costs of wind power energy will be high and it is reckoned that losses will be in the range of 5-6 billion Danish crowns, minus 2.5 billion saved by lack of CO 2 emission. The socio-economic factors regarding windmills of various sizes (150 kW and 225 kW) are calculated and the planned development of wind power until 2010 is explained. The socio-economic costs of the development programme under various conditions, including the calculation of the saved emissions of carbon dioxide, are discussed. The author states that, in the light of these arguments, he is not in agreement with the governmental plan for the development of wind-turbine produced electricity. It is suggested that this plan could be postponed until such time as wind-power produced electricity should be more competitive in price, and that it should not be pursued during a period of economic recession. (AB)

  17. System Dynamics Simulation of Large-Scale Generation System for Designing Wind Power Policy in China

    Directory of Open Access Journals (Sweden)

    Linna Hou

    2015-01-01

    Full Text Available This paper focuses on the impacts of renewable energy policy on a large-scale power generation system, including thermal power, hydropower, and wind power generation. As one of the most important clean energy, wind energy has been rapidly developed in the world. But in recent years there is a serious waste of wind power equipment and investment in China leading to many problems in the industry from wind power planning to its integration. One way overcoming the difficulty is to analyze the influence of wind power policy on a generation system. This paper builds a system dynamics (SD model of energy generation to simulate the results of wind energy generation policies based on a complex system. And scenario analysis method is used to compare the effectiveness and efficiency of these policies. The case study shows that the combinations of lower portfolio goal and higher benchmark price and those of higher portfolio goal and lower benchmark price have large differences in both effectiveness and efficiency. On the other hand, the combinations of uniformly lower or higher portfolio goal and benchmark price have similar efficiency, but different effectiveness. Finally, an optimal policy combination can be chosen on the basis of policy analysis in the large-scale power system.

  18. Planning integrated system and energy trading; Sistema integrado de planejamento e comercializacao de energia

    Energy Technology Data Exchange (ETDEWEB)

    Pizzatto, Wilson Tadeu; Ferreira, Luiz Roberto Morgenstern; Bloot, Marcio Luiz; Carneiro, Carlos Fernando Bley [Companhia Paranaense de Energia (COPEL), Curitiba, PR (Brazil)]. E-mails: pizzatto@copel.com; luiz.roberto@copel.com; mlbloot@copel.com; carlos.bley@copel.com; Bessa, Marcelo Rodrigues; Favoreto, Rafael de Souza [LACTEC - Instituto de Tecnologia para o Desenvolvimento, Curitiba, PR (Brazil)]. E-mails: bessa@lactec.org.br; favoreto@lactec.org.br

    2006-07-01

    In a complex system as the one composed by Brazilian Power Plants and connecting grid, with many associated risks, it is important to a Generation Company to use computer programs that help the decision making process in planning and energy commercialization areas. This paper describes the necessary steps to obtain a Integrated Planning and Energy Commercialization System which aims to measure the profitability of Brazilian Generation Company working in an Integrated Electric System based on hydropower generation. (author)

  19. Integrated control centre: Trading system for operation in a deregulated power market

    International Nuclear Information System (INIS)

    Nyland, S.; Reinertsen, T.; Gunnestad, J.; Botnan, G.O.

    1995-01-01

    The paper presents a trade system for operation in a deregulated power market. The trade system (ICC-Trade) is one of the application programs in the Integrated Control Centre (ICC). The Norwegian deregulated power market is briefly described in order to discuss the consequences of the new power market for the power utilities. The paper will also deal with the interconnection to other ICC application programs and how to make use of the communication with SCADA systems for support of managing market activities. Finally some future developments are presented. The trade system is developed in cooperation between a research institute, vendors of control centres, and power utilities, and is planned to be a commercial product during the spring of 1995. Before release the product will be tested in real life by a pilot customer. 4 figs

  20. Computer model for large-scale offshore wind-power systems

    Energy Technology Data Exchange (ETDEWEB)

    Dambolena, I G [Bucknell Univ., Lewisburg, PA; Rikkers, R F; Kaminsky, F C

    1977-01-01

    A computer-based planning model has been developed to evaluate the cost and simulate the performance of offshore wind-power systems. In these systems, the electricity produced by wind generators either satisfies directly demand or produces hydrogen by water electrolysis. The hydrogen is stored and later used to produce electricity in fuel cells. Using as inputs basic characteristics of the system and historical or computer-generated time series for wind speed and electricity demand, the model simulates system performance over time. A history of the energy produced and the discounted annual cost of the system are used to evaluate alternatives. The output also contains information which is useful in pointing towards more favorable design alternatives. Use of the model to analyze a specific wind-power system for New England indicates that electric energy could perhaps be generated at a competitive cost.

  1. The Effects of Top Management Support on Strategic Information Systems Planning Success

    Science.gov (United States)

    Elysee, Gerald

    2012-01-01

    The success of strategic information systems planning (SISP) is of paramount importance to academics as well as practitioners. SISP is a management process that enables organizations to successfully harness the power of current- and next-generation information systems (IS) applications to fulfill their business goals. Hence, by capturing the major…

  2. Power transfer capability assessment of transmission interfaces with SVC and load shedding systems

    Energy Technology Data Exchange (ETDEWEB)

    Pavlovsky, V. [DMCC-Engineering, Kiev (Ukraine). Inst. of Electrodynamics; Dolzhenitsa, Y. [DMCC Engineering, Kiev (Ukraine); Ushapovskiy, K. [National Power Co. Ukrenergo, Kiev (Ukraine)

    2009-07-01

    As a result of deregulation in the power industry, energy trade and markets are pushing transmission system operators to operate their systems closer to the edge of the power transfer capability. Voltage instability and inadequate reactive power support of generators is a key factor in most major outages around the world. The ideal way to control power systems is to avoid emergencies by reliable planning and secure operation of power systems. Therefore, the accurate calculation of the power transfer capability of transmission interfaces is an important task on the planning and operation stages. This paper discussed the issue of transfer capability assessment and monitoring for interfaces with static var compensator (SVC) and load shedding schemes. It also proposed a special measure, a distance to voltage instability point, to monitor transfer capability on-line. The distance may be observed by measurement of SVC output. The paper considered the problem of optimal SVC size selection and a new approach was proposed based on P-V curves analysis. The paper discussed the problem formulation and proposed approach. A case was also presented in order to demonstrate the proposed approach on the IPS Ukraine-Crimea interface. It was concluded that the proposed approach allows the optimal rating of SVC for increasing transfers capability of transmission corridors. 12 refs., 9 figs.

  3. Automated control system for the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Labik, V.

    1990-01-01

    Instrumentation of the automated control system of the Temelin nuclear power plant in the section of the main production unit and of the major auxiliary equipment is described, the results of testing are reported, and the present status of design activities is assessed. The suitability of application of Czechoslovak automation facilities to the instrumentation of the automated control system of the power plant was confirmed by the Soviet designer and supplier based on favorable results of polygonal testing. Capacity problems in the development of the designs and user software are alleviated by extensive cooperation. It is envisaged that all tasks will be fulfilled as planned. (P.A.). 1 fig., 5 refs

  4. New design system for nuclear power plant

    International Nuclear Information System (INIS)

    Kakuta, Masataka; Yoshinaga, Toshiaki; Yoshida, Ikuzo; Tokumasu, Shinji.

    1980-01-01

    As for the machine and equipment layout and the piping design for nuclear power plants, the multilateral coordination and study on such factors as functions, installation, radiation exposure and maintenance are required, and the high reliability is demanded. On the other hand, the quantity of things handled is enormous, therefore it is difficult to satisfy completely the above described requirements and to make plant planning which is completely free from the mutual interference of machines, equipments and pipings by the ordinary design with drawings only. Thereupon, the following new device was adopted to the design method for the purposes of improving the quality and shortening the construction period. Namely at the time of designing new plants, the rationalization of plant planning method was attempted by introducing color composite drawings and the technique of model engineering, at the same time, the newly developed design system for pipings was applied with a computer, thus the large accomplishment was able to be obtained regarding the improvement of reliability and others by making the check-up of the propriety. The design procedures of layout and piping, the layout design and general coordination in nuclear power stations with models and color composite drawings and the design system are explained. (Kako, I.)

  5. WEP. A wind energy planning system

    International Nuclear Information System (INIS)

    Larsen, H.V.

    1991-11-01

    The report describes the Wind Energy Planning system (WEP). It is intended as a decision support system to be used in the economic evaluation of wind energy projects. Such projects could be minor projects with only a single wind turbine or large wind farm projects consisting of several wind turbine plants. In the WEP system, a wind turbine is described by data on initial investment, possible later reinvestments, O and M costs, expected yearly production, life time, and capacity factor. The raising of loans are modelled, too. Depending on which output report is created, the value of the wind generated electricity is calculated in two different ways: either the electricity is assumed to be sold at a price (time series) given by the user, or the alternative conventional power production is modelled by its specific investment, O and M costs, life time, effectivity, fuel mix, and time series for fuel prices. Using these data, capacity credit and saved fuel and O and M costs are calculated. Due to the flexible data structure of the model, the user can easily create a scenario that models a large scale introduction of wind power. In such a scenario the gradual build up through several years of the wind power capacity can be modelled. The report describes in detail the menu structure, the input facilities, the output reports, and the organization of data. Also included is an example with full input documentation and output reports. (au)

  6. Planning of emergency medical treatment in nuclear power plant

    International Nuclear Information System (INIS)

    Kusama, Tomoko

    1989-01-01

    Medical staffs and health physicists have shown deep concerning at the emergency plans of nuclear power plants after the TMI nuclear accident. The most important and basic countermeasure for accidents was preparing appropriate and concrete organization and plans for treatment. We have planed emergency medical treatment for radiation workers in a nuclear power plant institute. The emergency medical treatment at institute consisted of two stages, that is on-site emergency treatment at facility medical service. In first step of planning in each stage, we selected and treatment at facility medical service. In first step of planning in each stage, we selected and analyzed all possible accidents in the institute and discussed on practical treatments for some possible accidents. The manuals of concrete procedure of emergency treatment for some accidents were prepared following discussion and facilities and equipment for medical treatment and decontamination were provided. All workers in the institute had periodical training and drilling of on-site emergency treatment and mastered technique of first aid. Decontamination and operation rooms were provided in the facillity medical service. The main functions at the facility medical service have been carried out by industrial nurses. Industrial nurses have been in close co-operation with radiation safety officers and medical doctors in regional hospital. (author)

  7. Nuclear power enterprise tax planning strategy in the background of reform

    International Nuclear Information System (INIS)

    Wu Yimin

    2012-01-01

    The success of tax planning can be converted into enterprise's productivity, tax planning strategy can maximize the desired effects and bring out its full play to tax planning. Taking new round of tax reform in 12th five-year-plan and the reformation of professional groups as the background, the author detailedly conceived a frame of corporate tax planning strategy for nuclear power enterprises of China National Nuclear Corporation at the forefront of reformation from an all-round comprehensive view and multi-angle stand. (author)

  8. FY 1998 Report on development of large-scale wind power generation systems. Research on the future prospects of wind power generation systems; 1998 nendo ogata furyoku hatsuden system kaihatsu. Furyoku hatsuden system no shorai tenbo ni kansuru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Current status of wind power generation in Japan and situations in foreign countries ahead of Japan are surveyed, in order to clarify the prospects for the future diffusion and expansion of wind power generation systems in Japan. The surveyed trends of wind power generation in Japan include those related to mandatory laws and regulations, e.g., the Electricity Enterprises Act, introductory and operation situations in local autonomies and electric power companies, and R and D efforts by academic and research organizations. The surveyed wind power generation situations in foreign countries include trends of international standardization for wind power generation, and global situations of introducing these systems. The on-the-spot oversea surveys include location/wind conditions in Greece's islands, cyclone-caused damages in India, World Renewable Energy Congress in Perth and advanced technologies in Europe for wind power generation systems, and the survey results are reported in detail. The surveyed R and D projects in Japan include the basic technological R and D plans (draft) for, e.g., wind power generation systems for isolated islands. (NEDO)

  9. 76 FR 64082 - Mandatory Reliability Standards for the Bulk-Power System; Notice of Staff Meeting

    Science.gov (United States)

    2011-10-17

    ... Reliability Standards for the Bulk-Power System; Notice of Staff Meeting Take notice that the Federal Energy... R1.3.10 of Commission-approved transmission planning Reliability Standard TPL-002- 0 (System... additional actions necessary to address the matter.\\3\\ \\1\\ Mandatory Reliability Standards for the Bulk-Power...

  10. Challenges, problems and possible solutions in wind generator systems from the aspect of forecast, planning and delivery of wind energy

    International Nuclear Information System (INIS)

    Giovski, Nikola

    2014-01-01

    The fundamental difficulties of integrating wind energy into the power system arise from its large temporal variability and limited predictability. That's why the integration of wind power presents major challenge for today's operating and planning practices of the power system operators. Accurate predictions of the possible wind power output, in time intervals relevant for creating schedules for production and exchange capacity, allows to system operators and dispatching personnel more efficient power system management. Despite the challenges and problems that arise due to integration of wind power into power systems, which need to be solved or reduced, wind power has its advantages that should be utilized. The effective integration of wind power plants into the transmission grid should allow them to represent the backbone of future energy systems. Modern wind generators represent production units that have the ability to participate in the management of energy systems e.g. in the regulation of frequency, voltage and other network operating requirements. This paper provides a brief overview of global experiences with the challenges, problems and possible solutions that appear in wind generator systems from the aspect of forecasting, planning and delivery of wind energy. (author)

  11. Southern African Power Pool: Planning and Prospects for Renewable Energy

    Energy Technology Data Exchange (ETDEWEB)

    Miketa, Asami [IRENA, Bonn (Germany); Merven, Bruno [Energy Research Centre, Univ. of Cape Town (South Africa)

    2013-06-25

    With the energy systems of many African countries dominated by fossil-fuel sources that are vulnerable to global price volatility, regional and intra-continental power systems with high shares of renewable energy can provide least-cost option to support continued economic growth and address the continent’s acute energy access problem. Unlocking Africa’s huge renewable energy potential could help to take many people out of poverty, while ensuring the uptake of sustainable technologies for the continent’s long-term development. The report examines the ''renewable scenario'' based on a modelling tool developed by IRENA and tested in cooperation with the South African National Energy Development Institute (SANEDI) and the Southern African Development Community (SADC). Initial results from the System Planning and Test (SPLAT) model show that the share of renewable technologies in Southern Africa could increase from the current 10% to as much as 46% in 2030, with 20% of decentralised capacity coming from renewable sources and nearly 80% of the envisaged capacity additions between 2010 and 2030 being provided by renewable energy technologies. Deployment and export of hydropower from the Democratic Republic of Congo’s Inga hydropower project to the SADC region would significantly reduce average electricity generation costs. Analysis using SPLAT – along with a similar model developed for West Africa – can provide valuable input for regional dialogue and energy projects such as the East and Southern Africa Clean Energy Corridor and the Programme for Infrastructure and Development in Africa (PIDA). IRENA, together with partner organisations, has started plans to set up capacity building and development support for energy system modelling and planning for greater integration of renewables in Africa. IRENA is also completing a similar model and study for East Africa and intends to extend this work to Central and North Africa.

  12. SP-100 power system conceptual design for lunar base applications

    International Nuclear Information System (INIS)

    Mason, L.S.; Bloomfield, H.S.; Hainley, D.C.

    1989-01-01

    A conceptual design is presented for a nuclear power system utilizing an SP-100 reactor and multiple Stirling cycle engines for operation on the lunar surface. Based on the results of this study, it was concluded that this power plant could be a viable option for an evolutionary lunar base. The design concept consists of a 2500 kWt (kilowatt thermal) SP-100 reactor coupled to eight free-piston Stirling engines. Two of the engines are held in reserve to provide conversion system redundancy. The remaining engines operate at 91.7 percent of their rated capacity of 150 kWe. The design power level for this system is 825 kWe. Each engine has a pumped heat-rejection loop connected to a heat pipe radiator. Power system performance, sizing, layout configurations, shielding options, and transmission line characteristics are described. System components and integration options are compared for safety, high performance, low mass, and ease of assembly. The power plant was integrated with a proposed human lunar base concept to ensure mission compatibility. This study should be considered a preliminary investigation; further studies are planned to investigate the effect of different technologies on this baseline design

  13. Energy and nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1985-01-01

    In this publication of the IAEA, after the introduction, four substantive parts follow. Part I, Energy demand and rational energy supply, deals with the needs for energy, primary energy resources and reserves, energy transport, storage, distribution and conservation, including the environmental effects on energy development. Part II, Economic aspects of energy development, presents an integrated view of the basic concepts of energy economics, evaluation of alternative energy projects with an in-depth comparison of electricity generation costs of nuclear and fossil-fuelled power plants. Part III, World energy development status and trends, begins with an overview of the world energy status and trends and continues with a presentation of the energy situation in industrialized countries and in developing countries. Part IV, Energy planning, deals with the optimization techniques, energy planning concepts and computerized models. The launching conditions and implementation of a nuclear power programme are described in detail. 582 references are given in the text and a bibliographical list of 356 titles has been added

  14. Sustainable power planning for the island of Crete

    International Nuclear Information System (INIS)

    Giatrakos, Georgios P.; Tsoutsos, Theocharis D.; Zografakis, Nikos

    2009-01-01

    Crete, as one of the largest and most touristic islands of the Mediterranean, is facing abrupt population and economic growth tendencies that result in the incessant problem of inability to meet power demand increase. This paper evaluates the island's present electrical energy status, and examines the possibility of further penetration of sustainable energy. Various energy modelling software solutions are examined and evaluated, in order to form scenarios according to the governmental and EU directives for renewable energy sources (RES), as well as to the planned conventional power plant upgrades and LNG transition. RES are fully exploited in the plan's scenarios, always taking into account all technical and legislative limitations. Analysis shows that even the most modest and realistic RES implementation scenarios, combined with a partially successful demand restriction, could indeed contract the island's environmental footprint. RES penetration in Crete's electric seems to be able to surpass 30% by 2020, surpassing even the optimistic EU targets for 20% RES by 2020

  15. A fuzzy set decision making model applied to electric power systems operation planning; Um modelo de decisao baseado em conjuntos nebulosos aplicado ao planejamento da operacao de sistemas de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, Mauricio Mendonca

    1993-05-01

    The power system static operation planning has a main objective the determination of performance strategies which satisfy operational criteria. A fuzzy set decision model which takes the load attainment and the compromise between optimality and critical operational constraints into account is presented. The prime characteristic of this methodology is the incorporation of the planner`s preferences structure in a decision process modeled by fuzzy sets. A routine of optimal power flow calculation is used as a computational tool for solving the nonlinear model of the electric power system and for defining the universe of discourse of the decision-making problem. tests were carried on a 30-bus IEEE system in order to find a compromise solution of electric operational goal versus reactive power generation limits. Results and conclusions are presented. (author) 28 refs., 32 figs.

  16. Applications of Multi-Agent Technology to Power Systems

    Science.gov (United States)

    Nagata, Takeshi

    Currently, agents are focus of intense on many sub-fields of computer science and artificial intelligence. Agents are being used in an increasingly wide variety of applications. Many important computing applications such as planning, process control, communication networks and concurrent systems will benefit from using multi-agent system approach. A multi-agent system is a structure given by an environment together with a set of artificial agents capable to act on this environment. Multi-agent models are oriented towards interactions, collaborative phenomena, and autonomy. This article presents the applications of multi-agent technology to the power systems.

  17. Indices for planning wind power generation; Furyoku hatsuden no keikaku shihyo

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, H

    1997-11-25

    Outlined herein are status of wind power generation development, indices for planning development, and actual development results. At present, wind power generates electric power of 6,781MW worldwide. USA has been rapidly developing wind power generation since enactment of the PURPA law, and accounted for 25% of the world output in the past. However, the county is recently unseated from the world top position by Germany, which has been extensively developing wind power generation since enactment of the EFL law to reach 1,799MW. In Japan, electric power companies, local governments and public institutions have been positively introducing wind mills since 1992, when Tohoku Electric Power Co. built Ryuhi Wind Park, now generating a total power of 15MW by 64 units located at 33 different points. According to the surveys by NEDO on wind conditions, there are a number of districts suited for wind mills in Hokkaido, Tohoku, Okinawa and sea areas in Honshu. The indices described herein for planning wind power generation include rotor diameter, tower height, speed of rotation, weight, power to be generated, utilization and service factors, noise level, and investment and running costs. In the present state of the development of wind power generation in Japan, development points are 33, generated ouptut 15,097kW and units 64. 14 figs.

  18. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  19. Slovenske elektrarne has fulfilled the plan of electric power production at 101 %

    International Nuclear Information System (INIS)

    Anon

    2004-01-01

    Slovenske elektrarne, a. s., produced in 2003 year the electric power in capacity 26,047.6 GWh, whereby they fulfilled business plan at 101 %. In compare with the last year it is a reduction in production by 1,397.3 GWh. The biggest share of production - till 68.6 % of overall production of the Slovenske elektrarne, was provided by nuclear sources. Nuclear power plants fulfilled business plan at 104 %, when Jaslovske Bohunice NPP has produced 11,625 GWh and Mochovce NPP 6,238 GWh. The share of other power plants on the electricity production is presented

  20. Hybrid2 - The hybrid power system simulation model

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, E.I.; Green, H.J.; Dijk, V.A.P. van [National Renewable Energy Lab., Golden, CO (United States); Manwell, J.F. [Univ. of Massachusetts, Amherst, MA (United States)

    1996-12-31

    There is a large-scale need and desire for energy in remote communities, especially in the developing world; however the lack of a user friendly, flexible performance prediction model for hybrid power systems incorporating renewables hindered the analysis of hybrids as options to conventional solutions. A user friendly model was needed with the versatility to simulate the many system locations, widely varying hardware configurations, and differing control options for potential hybrid power systems. To meet these ends, researchers from the National Renewable Energy Laboratory (NREL) and the University of Massachusetts (UMass) developed the Hybrid2 software. This paper provides an overview of the capabilities, features, and functionality of the Hybrid2 code, discusses its validation and future plans. Model availability and technical support provided to Hybrid2 users are also discussed. 12 refs., 3 figs., 4 tabs.

  1. Power system for production, construction, life support and operations in space

    International Nuclear Information System (INIS)

    Sovie, R.J.

    1988-01-01

    As one looks to man's future in space it becomes obvious that unprecedented amounts of power are required for the exploration, colonization, and exploitation of space. Activities envisioned include interplanetary travel and LEO to GEO transport using electric propulsion, Earth and lunar observatories, advance space stations, free-flying manufacturing platforms, communications platforms, and eventually evolutionary lunar and Mars bases. These latter bases would start as camps with modest power requirements (kWes) and evolve to large bases as manufacturing, food production, and life support materials are developed from lunar raw materials. These latter activities require very robust power supplies (MWes). The advanced power system technologies being pursued by NASA to fulfill these future needs are described. Technologies discussed will include nuclear, photovoltaic, and solar dynamic space power systems, including energy storage, power conditioning, power transmission, and thermal management. The state-of-the-art and gains to be made by technology advancements will be discussed. Mission requirements for a variety of applications (LEO, GEO, lunar, and Martian) will be treated, and data for power systems ranging from a few kilowatts to megawatt power systems will be represented. In addition the space power technologies being initiated under NASA's new Civilian Space Technology Initiative (CSTI) and Space Leadership Planning Group Activities will be discussed

  2. A Common Definition of the System Operators' Core Activities[Electric Power Transmission System Operator

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-02-15

    In this report a common definition of the system operator's core activities in the Nordic countries is identified and also a list of non-core activities is introduced. As a starting point the common tasks for system responsibility as identified by Nordel has been used for the work. The term TSO (Transmission System Operator) is employed as a common denominator in the report. It is found out that the TSOs carry out common core activities in the roles as a transmission operator, a system operator and a balance settlement responsible. The core activities for the TSO as a transmission network operator are: Maintain the adequate transmission system in the long run and network development plan on the national as well as on the Nordic level using sophisticated analysis and planning methods and tools. Plan the transmission network on the national as well as on the Nordic level utilising new investments, renewal and maintenance of existing network components so that the network is secure to operate and adequate transmission capacity is guaranteed. Aim at timely network expansions using enhanced information exchange between the Nordic TSOs, and on the national level between the TSO and distribution and regional network operators, large consumers and large producers. Secure the technical compatibility with networks across the border and within a country by establishing connection requirements on the national level and ensuring that the national requirements are compatible across the Nordic power system. The core activities for the TSO as a system operator are: Define common technical requirements for the secure system operation using common planning, operation, connection and data exchange procedures. Secure the system operation with the operational planning for the following year by using information exchange between TSOs enabling the TSOs to make the best possible forecast of the global grid situation in order to assess the flows in their network and the available

  3. IAEA activity on operator support systems in nuclear power plants

    International Nuclear Information System (INIS)

    Dounaev, V.; Fujita, Y.; Juslin, K.; Haugset, K.; Lux, I.; Naser, J.

    1994-01-01

    Various operator support systems for nuclear power plants are already operational or under development in the IAEA Member States. Operator support systems are based on intelligent data processing and, in addition to plant operation, they are also becoming more important for safety. A key feature of operator support systems is their availability to restructure data to increase its relevance for a given situation. This can improve the user's ability to identify plant mode, system state, and component state and to identify and diagnose faults. Operator support systems can also assist the user in planning and implementing corrective actions to improve the nuclear power plant's availability and safety. In September 1991, the IAEA Committee for Contractual Scientific Services approved the Co-ordinated Research Programme (CRP) on ''Operator Support Systems in Nuclear Power Plants'' in the framework of the Project ''Man-Machine Interface Studies''. The main objective of this programme is to provide guidance and technology transfer for the development and implementation of operator support systems. This includes the experience with human-machine interfaces and closely related issues such as instrumentation and control, the use of computers in nuclear power plants, and operator qualification. (author)

  4. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    International Nuclear Information System (INIS)

    Durling, R L; Price, D E; Spero, K K

    2005-01-01

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented

  5. Application of diagnostic system for diesel engines in nuclear power plant

    International Nuclear Information System (INIS)

    Yoshinaga, Takeshi

    2004-01-01

    The diagnostic system for diesel engines makes a diagnosis of secular change and abnormal indications of diesel engines (DG) by combination of characteristic analysis of engine, lubricating oil, fuel oil, and cooling water. The principles of diagnostic system for DG, results of confirmation of the efficiency and the maintenance plan for DG in the Japan Atomic Power Company are described. DG in the company is classified to a safety device in order to supply the power source to the Emergency Core Cooling System etc., when the power source in the plant is lost, for example, at lightning struck. Characteristics of DG, outline of the diagnostic system for DG, diagnostic technologies such as engine signature analysis, chemical analysis of samples, temperature measurement, degradation mode of DG, and training in the company are stated. (S.Y.)

  6. Non-linear multi-objective model for planning water-energy modes of Novosibirsk Hydro Power Plant

    Science.gov (United States)

    Alsova, O. K.; Artamonova, A. V.

    2018-05-01

    This paper presents a non-linear multi-objective model for planning and optimizing of water-energy modes for the Novosibirsk Hydro Power Plant (HPP) operation. There is a very important problem of developing a strategy to improve the scheme of water-power modes and ensure the effective operation of hydropower plants. It is necessary to determine the methods and criteria for the optimal distribution of water resources, to develop a set of models and to apply them to the software implementation of a DSS (decision-support system) for managing Novosibirsk HPP modes. One of the possible versions of the model is presented and investigated in this paper. Experimental study of the model has been carried out with 2017 data and the task of ten-day period planning from April to July (only 12 ten-day periods) was solved.

  7. Present state and long term planning on nuclear power plants in principal countries in the world

    International Nuclear Information System (INIS)

    Nomura, Junichi

    1978-01-01

    The situation of nuclear power stations and the long term planning in each major country in the world were summarized, but the situation is changing from time to time, therefore it is difficult to make the long term prediction. The advanced countries in terms of nuclear power established the long term plans to adopt nuclear power generation largely owing to the oil crisis, but thereafter the revision was carried out again and again in respective countries. The developing countries already started the operation of nuclear power generation occupy only 2 to 3% of the total installed capacity in the world, but the countries constructing or planning nuclear power generation are many, and if the operation will be started as scheduled, their capacity will reach 30 million kW by 1985, and occupy about 10% of the total installed capacity of nuclear power generation in the world. As for the range of investigation of this report, the countries where the long term plans are unknown or the number of construction is small, Japan, Great Britain, USA and communist countries are excluded. As a rule, the light water reactors with power output of more than 200,000 kW are listed. The number of nuclear power plants in operation, under construction and in planning stage, national situation, long term plan, and others in each country are described. (Kako, I.)

  8. Cost/benefit assessment in electric power systems

    International Nuclear Information System (INIS)

    Oteng-Adjei, J.

    1990-01-01

    The basic function of a modern power system is to satisfy the system load requirements as economically as possible and with a reasonable assurance of continuity and quality. The question of what is reasonable can be examined in terms of the costs and the worth to the consumer associated with providing an adequate supply. The process of preparing reliability worth estimates based on customer cost-of-interruption data is presented. These data can be derived for a particular utility service area and are used to determine appropriate customer damage functions. These indicators can be used with the basic loss of energy expectation (LOEE) index to obtain a factor that can be utilized to relate the customer losses to the worth of electric service reliability. This factor is designated as the interrupted energy assessment rate (IEAR). The developed IEAR values can be utilized in both generating capacity and composite generation and transmission system assessment. Methods for using these estimates in power system optimization at the planning stages are described and examples are used to illustrate the procedures. 106 refs., 77 figs., 64 tabs

  9. Wind Generation Participation in Power System Frequency Response: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; Zhang, Yingchen

    2017-01-01

    The electrical frequency of an interconnected power system must be maintained close its nominal level at all times. Excessive under- and overfrequency excursions can lead to load shedding, instability, machine damage, and even blackouts. There is a rising concern in the electric power industry in recent years about the declining amount of inertia and primary frequency response (PFR) in many interconnections. This decline may continue due to increasing penetrations of inverter-coupled generation and the planned retirements of conventional thermal plants. Inverter-coupled variable wind generation is capable of contributing to PFR and inertia with a response that is different from that of conventional generation. It is not yet entirely understood how such a response will affect the system at different wind power penetration levels. The modeling work presented in this paper evaluates the impact of wind generation's provision of these active power control strategies on a large, synchronous interconnection. All simulations were conducted on the U.S. Western Interconnection with different levels of instantaneous wind power penetrations (up to 80%). The ability of wind power plants to provide PFR - and a combination of synthetic inertial response and PFR - significantly improved the frequency response performance of the system.

  10. Development of decommissioning engineering support system (DEXUS) of the Fugen Nuclear Power Station

    International Nuclear Information System (INIS)

    Iguchi, Yukihiro; Kanehira, Yoshiki; Tochibana, Mitsuo

    2004-01-01

    The Fugen Nuclear Power Station (NPS) was shut down permanently in March 2003, and preparatory activities are underway to decommission the Fugen NPS. An engineering system to support the decommissioning is being developed to create a dismantling plan using state-of-art software such as 3-dimensional computer aided design (3D-CAD) and virtual reality (VR). In particular, an exposure dose evaluation system using VR has been developed and tested. The total system can be used to quantify radioactive waste, to visualize radioactive inventory, to simulate the dismantling plan, to evaluate workload in radiation environments and to optimize the decommissioning plan. The system will also be useful for educating and training workers and for gaining public acceptance. (author)

  11. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide applies to nuclear power plants for which the total power supply comprises normal power supply (which is electric) and emergency power supply (which may be electric or a combination of electric and non-electric). In its present form the Guide provides general guidance for all types of emergency power systems (EPS) - electric and non-electric, and specific guidance (see Appendix A) on the design principles and the features of the emergency electric power system (EEPS). Future editions will include a second appendix giving specific guidance on non-electric power systems. Section 3 of this Safety Guide covers information on considerations that should be taken into account relative to the electric grid, the transmission lines, the on-site electrical supply system, and other alternative power sources, in order to provide high overall reliability of the power supply to the EPS. Since the nuclear power plant operator does not usually control off-site facilities, the discussion of methods of improving off-site reliability does not include requirements for facilities not under the operator's control. Sections 4 to 11 of this Guide provide information, recommendations and requirements that would apply to any emergency power system, be it electric or non-electric

  12. Task V of the IEA Photovoltaic Power Systems Program: Accomplishments and Activities

    International Nuclear Information System (INIS)

    Bower, Ward

    1999-01-01

    The International Energy Agency (IEA) is an energy forum for 24 industrialized countries and was established in 1974 as an autonomous body within the Organization for Economic Cooperation and Development (OECD). The IEA Photovoltaic Power Systems (PVPS) program implementing agreement was signed in 1993, and renewed for another five years in 1998. Twenty-two countries are collaborating under the auspices of the IEA in the PVPS to address common technical and informational barriers that often limit the rate at which photovoltaic technologies advance into the markets. Task V of the IEA PVPS is entitled ''Grid Interconnection of Building-Integrated and Other Dispersed Photovoltaic Power Systems.'' The task sponsored a workshop in September 1997 on grid-interconnection of photovoltaic systems and is planning a second workshop to address impacts of more penetration of dispersed systems into the utility grid. This paper will summarize the accomplishments of Task V over the last five years and will detail the planned work for the next three years

  13. Impacts of Wind Power on Power System Stability

    NARCIS (Netherlands)

    Vittal, E.; Keane, A.; Slootweg, J.G.; Kling, W.L.; Ackermann, T.

    2012-01-01

    This chapter examines how wind power will impact the stability of power systems. It focuses on the three aspects of power system stability: voltage stability, rotor angle stability and frequency stability. It completes a detailed analysis as to how wind power in power systems will impact the

  14. A Study on the computerization of power system analysis of local control center

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Tae Won; Hwang, Jong Young; Jeon, Young Soo; Park, Yong Bae [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center; Kim, Kun Jung; Kim, Yong Bae [Electrical Engineering and Science Research Institute (Korea, Republic of)

    1995-12-31

    Introducing PSS/E software PC version of PTI, after investigating several programs. For convenient use, translated application manual and operational manual in korean language. Unifying of bus numbering for managing and sharing the data which is using in PSS/E program. Preparing load flow theory quick reference manual and training users of PSS/E to promotability of power system analysis and power system planning (author). 12 refs., 43 figs.

  15. A Study on the computerization of power system analysis of local control center

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Tae Won; Hwang, Jong Young; Jeon, Young Soo; Park, Yong Bae [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center; Kim, Kun Jung; Kim, Yong Bae [Electrical Engineering and Science Research Institute (Korea, Republic of)

    1996-12-31

    Introducing PSS/E software PC version of PTI, after investigating several programs. For convenient use, translated application manual and operational manual in korean language. Unifying of bus numbering for managing and sharing the data which is using in PSS/E program. Preparing load flow theory quick reference manual and training users of PSS/E to promotability of power system analysis and power system planning (author). 12 refs., 43 figs.

  16. Electric power transmission system: A new expansion scheme

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    With the purpose of responding to the interconnection requirements among the main cities of the country, a company of public character was created, in charge of the planning and of the development of the national interconnected system (NIS), in such form that their work optimized the use of the available energy resources for the electricity supply and it improved the accounting levels and quality of the service. Starting from 1967, interconnection electric Corp., ISA, a very important task began in the development of methodologies and strategies of expansion of the INS that it allowed, in very short term, to connect the areas of Bogota the Atlantic Cost, Antioquia and the Cauca Valley and to develop important generation projects for the supply of electric power of the country. Then, the electric sector was reformed through the laws 142 and 143 of 1994, in search of the specialization of the business and in that sense, ISA is divided in two companies: ISAGEN that the activities degeneration and electric power commercialization, and ISA, company electric power transport, that it takes charge of the interconnection of the national system assumes. In connection with the execution of the transmission works and in the face of the possibility of lingering courts of energy, the law establishes that ISA will carry out the works that are needed and that the particular initiative doesn't develop. For that same time, it is considered that the planning should be carried out in an integral way, taking into account the requirements of the population's energy and its possibilities of supply and through programs and actions of appropriate use of the available energy resources. The UPME (Unit of Planning Miner Energetic) was created for assumes this work, so with their analyses they already offer signs to the state the investors, about the population's necessities and of the business opportunities, respectively

  17. The interplay of governance, power and citizen participation in community tourism planning

    Science.gov (United States)

    E.J. Jordan; C.A. Vogt; Linda Kruger; N. Grewe

    2013-01-01

    This research examines a unique case of tourism planning and explores the relationships between governance, power, and citizen participation in community decision-making. In less than two years, the community of Sitka, Alaska, undertook two separate tourism-planning processes in response to proposed tourism development. The first plan followed a participant-led...

  18. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  19. Recent control and instrumentation systems for BWR nuclear power plant

    International Nuclear Information System (INIS)

    Fujii, Hiroaki; Higashikawa, Yuichi; Sato, Hideyuki

    1990-01-01

    For the needs of the more stable operation of nuclear power stations, the upgrading of the measurement and control system for BWRs has been promoted by positively introducing remarkably advancing electronic technology. Further, it is aimed at to construct the synthetic digitized measurement and control system for nuclear power stations to heighten the operation reliability in ABWRs. As the first step of the development in the synthetic digitization, the monitoring and control system for radioactive waste treatment was put in practical use for No.5 plant of Kashiwazaki, Kariwa Nuclear Power Station, Tokyo Electric Power Co., Inc. Hitachi Ltd. has promoted the development and the application to actual plants of the measurement and control system for BWRs, in which digital control technology, optical information transmission technology and the operation-supporting technology using a computer were utilized. Hereafter, it is intended to expand the application of digital measurement and control aiming at improving the reliability, operation performance and maintainability. The nuclear power plant control complex with advanced man-machine interface-90 (NUCAMM-90) was developed, and its application to actual plants is planned. (K.I.)

  20. Research on adoption of graphic processing system into electric power facilities operation management. Denryoku setsubi kanri gyomu ni okeru zukei shori system no tekiyo ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Jitsubuchi, Yoshiyasu; Uryu, Kenji; Terasaki, Naoaki (Kyushu Electric Power Co., Inc., Fukuoka (Japan))

    1989-03-30

    In the technical department of electric power companies, there are innumerable single line diagram, machinery arrangement plan and other facilities drawings. Based on those drawings, facilities planning, work design, construction plan, maintenance and management data, etc. are made, for which making heightening is desired in efficiency of drawing filing management. Therefore, research was made on the adoption of CAD technology through modeling power transmission line, and power generating and transforming station operation management. First for the application of power transmission facilities, the power transmission line plan and facilities information were planned to be unified in management. Ie., the power transmission line plan and profile being shown on the display, symbols of steel towers, cable lines, etc. were further picked by mouth to easily substantiate the facilities. While image input and CAD of drawing were made in combined treatment. Then for the application to the power generating and transforming facilities, the single line diagram and facilities information were unified in management, together with demonstration of data interchangeability among different kinds of CAD system. 13 figs., 9 tabs.

  1. Microwave energy transmission system for solar power station

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, Hiroshi

    1988-05-05

    This paper deals with a microwave wireless energy transmission system which will be required for a solar power station under investigation, particularly, it describes its foundation and future investigation. It is supposed that for realization of microwave wireless transmission techniques, it is most important to investigate the effect of strong microwave beams on a plasma environment, establish control techniques for microwave beams in which a retro-directive system is combined with a computer control system, and develop a semiconductor transmission module. Institute of Space and Astronautical Science (Japan) made an experiment on the effect of microwaves on ionospheric plasma by using an observatory rocket. The institute has planned to make an experiment on a microwave energy transmission system which is to be mounted to a small-scale space flyer unit in order to examine the control of microwave beams and 10 KW power transmission, in addition to investigation on the interaction of microwave energy beams with a plasma environment. (4 figs, 3 tabs, 20 refs)

  2. Knowledge-Based operation planning system for boiling water reactors

    International Nuclear Information System (INIS)

    Tatsuya Iwamoto; Shungo Sakurai; Hitoshi Uematsu; Makoto Tsuiki

    1987-01-01

    A knowledge-Based Boiling Water Reactor operation planning system was developed to support core operators or core management engineers in making core operation plans, by automatically generating suboptimum core operation procedures. The procedures are obtained by searching a branching tree of the possible core status (nodes) and the elementary operations to change the core status (branches). A path that ends at the target node, and contains only operationally feasible nodes can be a candidate of the solution. The core eigenvalue, the power distribution and the thermal limit parameters at key points are calculated by running a three-dimensional (3-D) BWR core physics simulator to examine the feasibility of the nodes and the performance of candidates. To obtain a practically acceptable solution within a reasonable time rather than making a time-consuming effort to get the optimum one, the Depth-First-Search method, together with the heuristic branch-bounding, was used to search the branching tree. The system was applied to actual operation plannings with real plant data, and gave satisfactory results. It can be concluded that the system can be applied to generate core operation procedures as a substitute for core management experts

  3. Revised sequence components power system models for unbalanced power system studies

    Energy Technology Data Exchange (ETDEWEB)

    Abdel-Akher, M. [Tunku Abdul Rahman Univ., Kuala Lumpur (Malaysia); Nor, K.-M. [Univ. of Technology Malaysia, Johor (Malaysia); Rashid, A.H.A. [Univ. of Malaya, Kuala Lumpur (Malaysia)

    2007-07-01

    The principle method of analysis using positive, negative, and zero-sequence networks has been used to examine the balanced power system under both balanced and unbalanced loading conditions. The significant advantage of the sequence networks is that the sequence networks become entirely uncoupled in the case of balanced three-phase power systems. The uncoupled sequence networks then can be solved in independent way such as in fault calculation programs. However, the hypothesis of balanced power systems cannot be considered in many cases due to untransposed transmission lines; multiphase line segments in a distribution power system; or transformer phase shifts which cannot be incorporated in the existing models. A revised sequence decoupled power system models for analyzing unbalanced power systems based on symmetrical networks was presented in this paper. These models included synchronous machines, transformers, transmission lines, and voltage regulators. The models were derived from their counterpart's models in phase coordinates frame of reference. In these models, the three sequence networks were fully decoupled with a three-phase coordinates features such as transformer phase shifts and transmission line coupling. The proposed models were used to develop an unbalanced power-flow program for analyzing both balanced and unbalanced networks. The power flow solution was identical to results obtained from a full phase coordinate three-phase power-flow program. 11 refs., 3 tabs.

  4. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  5. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  6. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  7. A study on optimal SFCL specification to enhance the transfer capability on Korean power system

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Minhan, E-mail: radiance0@korea.ac.kr [School of Electrical Engineering, Korea University, Anam-dong 5-ga, Seongbuk-gu, Seoul 136-713 (Korea, Republic of); Lee, Hansang [School of Railway and Electrical Engineering, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Cho, Yoonsung [Department of Electric and Energy Engineering, Catholic university of Daegu, Gyeongbuk 712-702 (Korea, Republic of); Jung, Seungmin [School of Electrical Engineering, Korea University, Anam-dong 5-ga, Seongbuk-gu, Seoul 136-713 (Korea, Republic of); Jang, Gilsoo, E-mail: gjang@korea.ac.kr [School of Electrical Engineering, Korea University, Anam-dong 5-ga, Seongbuk-gu, Seoul 136-713 (Korea, Republic of)

    2014-09-15

    Highlights: • The fault current problem is a severe issue in the Korean power system in the future. • The fault current contribution method has been used with the real Korean power system planning data. • The effectiveness of the SFCL application is verified using the proposed algorithm. - Abstract: The Korea Electric Power Corporation (KEPCO) power system has the characteristics of the load being concentrated in the Seoul metropolitan region and direct power transfer from generations located at distant points in the system thereby resulting in high levels of fault current in the metropolitan region during fault conditions. This fault current problem in the metropolitan region has been a critical issue during the past few years where the increase in the load elevates the fault current levels thereby requiring the replacement of numerous circuit breakers. In order to reduce the fault current levels in the system, the installation of superconductivity fault current limiter (SFCL) has been considered as a solution to reduce the fault current levels in the system. In this paper, an optimal SFCL specification is proposed, by using the fault current contribution method, for siting the optimal location of the SFCL to minimize the current injection into the fault point. The effectiveness of the SFCL application is being verified by simulations based on the KEPCO power system planning data where several installation points are examined for effective reduction of the fault current issue in the system.

  8. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  9. Least cost planning within the service concept of power supply companies

    International Nuclear Information System (INIS)

    Lueschen, H.; Sonntag, J.; Werner, R.

    1995-01-01

    In discussing the implementation of energy service concepts, German power supply companies are gradually adopting categories originating from the USA, namely integrated resources planning (IRP), least cost planning (LCP), and demand-side management (DSM). While the activities of German power supply companies are more encompassing than those of their US counterparts in the traditional features of DSM such as load management, information, and consulting, further-going measures such as direct investment and financial incentive programmes for exploiting energy-saving potentials play a less important role and are controversial in the energy-political debate. The article presents the concept of power supply companies for implementing IRP/LCP and makes a concrete assessment of the worth and efficiency of consulting compared with the newer type of financial incentive programmes. (orig.) [de

  10. Participation of the ININ in the external radiological emergency plan of the Laguna Verde power plant

    International Nuclear Information System (INIS)

    Martinez S, R.; Cervini L, A.

    1991-01-01

    The planning of performances in radiological emergencies, with the object of reducing the consequences as much as possible on the population to accidental liberations of radioactive material coming from Nuclear power plant, it has been of main interest in the nuclear community in the world. In Mexico it has not been the exception, since with the setting in march of the Laguna Verde nuclear power plant exists an executive program of planning for emergencies that it outlines the activities to follow trending to mitigate the consequences that are derived of this emergency. As integral part of this program this the External Plan of Radiological Emergency (PERE) that covers the emergencies that could leave the frontiers of the Laguna Verde power plant. In the PERE it settles down the planning, address and control of the preparation activities, response and recovery in emergencies, as well as the organization and coordination of the institutions that participate. The National Institute of Nuclear Research (ININ), like integral part of these institutions in the PERE, has an infrastructure that it allows to participate in the plan in a direct way in the activities of 'Control of the radiological exhibition the response personnel and control of water and foods' and of support way and consultant ship in the activities of 'Monitoring, Classification and decontamination of having evaluated' and 'Specialized medical radiological attention'. At the moment the ININ has a radiological mobile unit and this conditioning a second mobile unit to carry out part of the activities before mentioned; also accounts with 48 properly qualified people that directly intervene in the plan. In order to guarantee an adequate response in the PERE an organization it has been structured like that of the annex as for the personnel, transport, team, procedures and communication system, with the objective always of guaranteeing the security and the population's health in emergency situations in the

  11. Planning method for integration and expansion of renewable energy sources with special attention to security supply in distribution system

    Energy Technology Data Exchange (ETDEWEB)

    Cerda-Arias, Jose Luis

    2012-07-01

    Today's structure of power systems with competitive wholesale markets for electricity encourages the introduction of new agents and products, customers with self-generating capacity and the specialization of generators, network operators and power suppliers. Furthermore one has to take into account the variation of the fossil fuel prices in the world market, which even anticipates the closeness of its scarcity, the instability of the fulfilment of contracts, and the existence of import restrictions. In addition the implementation of policies aiming to control CO{sub 2} emissions, and efficient use of energy plus the advent of more efficient technologies have to be incorporated in new network expansion projects. These are forcing utilities and society to seek new forms of electric system expansion without affecting their economic growth. This expresses a challenge to sustain such a growth changing the vision for the power system and the required security of electricity supply, usually based on internal factors of the electric sector, without considering the connection between the current transmission and distribution networks, the uncertainties related to the competition in the electricity market and the effect of distributed generation units. The high penetration of distributed generation resources, based on renewable energy sources, is increasingly observed worldwide and it depends on the cost of the technologies, market design, and subsidies. On that account, it is necessary to find alternatives and offers to develop a sustainable strategic plan for power system expansion. Currently, efforts are oriented to develop planning models which consider the income of power generation based on renewable energy sources founded on these new requirements, bearing in mind the relationship between the competitive markets and the power system planning. In this Thesis a general planning method for the expansion of the power grids is proposed. This planning method should

  12. Power system distributed oscilation detection based on Synchrophasor data

    Science.gov (United States)

    Ning, Jiawei

    Along with increasing demand for electricity, integration of renewable energy and deregulation of power market, power industry is facing unprecedented challenges nowadays. Within the last couple of decades, several serious blackouts have been taking place in United States. As an effective approach to prevent that, power system small signal stability monitoring has been drawing more interests and attentions from researchers. With wide-spread implementation of Synchrophasors around the world in the last decade, power systems real-time online monitoring becomes much more feasible. Comparing with planning study analysis, real-time online monitoring would benefit control room operators immediately and directly. Among all online monitoring methods, Oscillation Modal Analysis (OMA), a modal identification method based on routine measurement data where the input is unmeasured ambient excitation, is a great tool to evaluate and monitor power system small signal stability. Indeed, high sampling Synchrophasor data around power system is fitted perfectly as inputs to OMA. Existing methods in OMA for power systems are all based on centralized algorithms applying at control centers only; however, with rapid growing number of online Synchrophasors the computation burden at control centers is and will be continually exponentially expanded. The increasing computation time at control center compromises the real-time feature of online monitoring. The communication efforts between substation and control center will also be out of reach. Meanwhile, it is difficult or even impossible for centralized algorithms to detect some poorly damped local modes. In order to avert previous shortcomings of centralized OMA methods and embrace the new changes in the power systems, two new distributed oscillation detection methods with two new decentralized structures are presented in this dissertation. Since the new schemes brought substations into the big oscillation detection picture, the proposed

  13. Risk assessment of power systems models, methods, and applications

    CERN Document Server

    Li, Wenyuan

    2014-01-01

    Risk Assessment of Power Systems addresses the regulations and functions of risk assessment with regard to its relevance in system planning, maintenance, and asset management. Brimming with practical examples, this edition introduces the latest risk information on renewable resources, the smart grid, voltage stability assessment, and fuzzy risk evaluation. It is a comprehensive reference of a highly pertinent topic for engineers, managers, and upper-level students who seek examples of risk theory applications in the workplace.

  14. Influence of big power motors for irrigation of electric systems

    International Nuclear Information System (INIS)

    Shimoda, M.; Gialuca, V.; Trombetta, O.R.

    1988-01-01

    The evolution of rural electrification in CPFL - Companhia Paulista de Forca e Luz, Sao Paulo State, Brazil, and the influence of big power motors installation for irrigation in electric system are shown. Considerations about rural market, energy consumption, planning of distribution and transmission line and some calculations are also presented. (author)

  15. West African Power Pool: Planning and Prospects for Renewable Energy

    Energy Technology Data Exchange (ETDEWEB)

    Miketa, Asami [IRENA, Bonn (Germany); Merven, Bruno [Energy Research Centre, Univ. of Cape Town (South Africa)

    2013-06-25

    With the energy systems of many African countries dominated by fossil-fuel sources that are vulnerable to global price volatility, regional and intra-continental power systems with high shares of renewable energy can provide least-cost option to support continued economic growth and address the continent’s acute energy access problem. Unlocking Africa’s huge renewable energy potential could help to take many people out of poverty, while ensuring the uptake of sustainable technologies for the continent’s long-term development. The report examines a ''renewable scenario'' based on a modelling tool developed by IRENA and tested with assistance from the Economic Community of West African States (ECOWAS). Initial results from the ECOWAS Renewable Energy Planning (EREP) model for continental ECOWAS countries show that the share of renewable technologies in the region could increase from the current 22% of electricity generation to as much as 52% in 2030, provided that the cost of these technologies continues to fall and fossil fuel prices continue to rise. In this scenario, nearly half of the envisaged capacity additions between 2010 and 2030 would be with renewable technologies. Analysis using EREP – along with a similar model developed for Southern Africa – can provide valuable input for regional dialogue and energy projects such as the East and Southern Africa Clean Energy Corridor and the Programme for Infrastructure and Development in Africa (PIDA). IRENA, together with partner organisations, has started plans to set up capacity building and development support for energy system modelling and planning for greater integration of renewables in Africa. IRENA is also completing a similar model and study for East Africa and intends to extend this work to Central and North Africa.

  16. A methodology to assist in contingency planning for protection of nuclear power plants against land vehicle bombs

    International Nuclear Information System (INIS)

    James, J.W.; Goldman, L.A.; Lobner, P.R.; Finn, S.P.; Koch, T.H.; Veatch, J.D.

    1989-04-01

    This report provides a methodology which could be used by operators of licensed nuclear power reactors to address issues related to contingency planning for a land vehicle bomb, should such a threat arise. The methodology presented in this report provides a structured framework for understanding factors to be considered in contingency planning for a land vehicle bomb including: (1) system options available to maintain a safe condition, (2) associated components and equipment, (3) preferred system options for establishing and maintaining a safe shutdown condition, and (4) contingency measures to preserve the preferred system options. Example applications of the methodology for a Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) are provided along with an example of contingency plan changes necessary for implementation of this methodology, a discussion of some contingency measures that can be used to limit land vehicle access, and a bibliography. 2 refs., 11 figs., 6 tabs

  17. Implementing digital instrumentation and control systems in the modernization of nuclear power plants

    International Nuclear Information System (INIS)

    2009-01-01

    The IAEA encourages greater use of good engineering and management practices by Member States. In particular, it supports activities such as nuclear power plant (NPP) performance improvement, plant life management, training, power uprating, operational license renewal and the modernization of instrumentation and control (I and C) systems of NPPs in Member States. The subject of implementing digital I and C systems in nuclear power plants was suggested by the Technical Working Group on Nuclear Power Plant Control and Instrumentation (TWG-NPPCI) in 2003. It was then approved by the IAEA and included in the programmes for 2006-2008. As the current worldwide fleet of nuclear power plants continues ageing, the need for improvements to maintain or enhance plant safety and reliability is increasing. Upgrading NPP I and C systems is one of the possible approaches to achieving this improvement, and in many cases upgrades are a necessary activity for obsolescence management. I and C upgrades at operating plants require the use of digital I and C equipment. While modernizing I and C systems is a significant undertaking, it is an effective means to enhance plant safety and system functionality, manage obsolescence, and mitigate the increasing failure liability of ageing analog systems. Many of the planning and implementation tasks of a digital I and C upgrade project described here are also relevant to new plant design and construction since all equipment in new plants will be digital. This publication explains a process for planning and conducting an I and C modernization project. Numerous issues and areas requiring special consideration are identified, and recommendations on how to integrate the licensing authority into the process are made. To complement this report, a second publication is planned which will illustrate many of the aspects described here through experience based descriptions of I and C projects and lessons learned from those activities. It is upon these

  18. Wind farm - A power source in future power systems

    DEFF Research Database (Denmark)

    Chen, Zhe; Blaabjerg, Frede

    2009-01-01

    wind turbines and wind farms, and then introduces the wind power development and wind farms. An optimization platform for designing electrical systems of offshore wind farms is briefed. The major issues related to the grid connection requirements and the operation of wind turbines/farms in power......The paper describes modern wind power systems, introduces the issues of large penetration of wind power into power systems, and discusses the possible methods of making wind turbines/farms act as a power source, like conventional power plants in power systems. Firstly, the paper describes modern...... systems are illustrated....

  19. Evaluation of Radiological Impacts on the Operating Kartini Reactor and Natural Radioactivity of the Site Plan of Nuclear Power Plant Area

    International Nuclear Information System (INIS)

    Yazid, M; Sutresna, G; Sulistyono, A; Ngasifudin

    1996-01-01

    This radiological impacts evaluation covered of radioactivity in water, soil, grass, air samples and ambient gamma radiation that have been carried out in the Kartini reactor area and in the site plan of nuclear power plan are at Ujung Lemah Abang, Jepara, Central Java. The aim of this research was to determine that radiological impacts in the environment around the Kartini reactor compared to natural radioactivity for site plan of nuclear power plan area. The radioactivity in the water, soil and grass samples ware measured by low background beta counting system and were identified by low background gamma spectrometer. The radioactivity in the air samples was measured by beta portable counting system and the ambient gamma radiation was measured by portable high pressurized ionization chamber model RSS-112 Reuther-Stokes. The reactor data measurement was compared to the site plan of nuclear power plant area data for evaluation of radiological impacts on the operating reactor. From the evaluation and comparison can be concluded there are no indication of the radionuclide release from the reactor operation. The average radiactivity in the water, soil grass and air sample from the reactor area were between 0.17 - 0.61 Bq/1; 0,47 - 0,74 Bq/g; 4.43 - 4.60 Bq/g.ash and 49.53 - 70.90 x 10 Bq/cc. The average radioactivity of those sample from the nuclear power plant area were between 0.06-0.90 Bq/I; 0.02-0.86 Bq/g; 1.68-8.07 Bq/g.ash and 65.0-152.3 x 10 Bq/cc. The ambient gamma radiation were between 6.9-36.7 urad/h for the reactor area and 6.8-19.2 urad/h for the nuclear power plant area

  20. Interregional power transmission: a component in planning for renewable energy technologies

    International Nuclear Information System (INIS)

    Krueger Nielsen, S.; Soerensen, B.

    2000-01-01

    We discuss the role played by interregional power transmission on the basis of recent scenario work. In a project dealing with long-term planning for energy efficiency and renewable energy in Europe we modelled a scenario for the present 15 EU countries' energy system in 2050. The basis for the scenario is the concept of 'fair pricing' for energy services, meaning that the price of energy should reflect all externalities, but not otherwise be taxed or subsidized. The project assessed resource availability and expected technology price developments over time for a number of energy-related technologies, both on the supply side, the intermediate conversion chain and on the demand side. Among these, transmission technologies play an important role, both in smoothing out renewable energy supplies within the European Union region, and also allowing substantial import of energy from countries outside the EU having a surplus of renewable energy based power. (orig.)

  1. Dungeness Power Station off-site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This off-site Emergency Plan in the event of an accidental release of radioactivity at the Dungeness Nuclear power station sets out the necessary management and coordination processes between Nuclear Electric, operators of the site, the emergency services and relevant local authorities. The objectives promoting the aim are identified and the activities which will be undertaken to protect the public and the environment in the event of an emergency are outlined. (UK)

  2. Change in plan for installation of nuclear reactor in Genkai Nuclear Power Plant of Kyushu Electric Power Co., Inc. (change in plan for No.3 and No.4 nuclear reactor facilities) (report)

    International Nuclear Information System (INIS)

    1987-01-01

    This report, compiled by the Nuclear Safety Commission to be submitted to the Minister of International Trade and Industry, deals with studies on a proposed change in the plan for the installation of nuclear reactors in the Genkai Nuclear Power Plant of Kyushu Electric Power Co., Inc. (change in the plan for the No.3 and No.4 nuclear reactor facilities). The conclusions of and principles for the examination and evaluation are described first. The studies carried out are focused on the safety of the facilities, and it is concluded that part of the proposed change is appropriate with respect to the required technical capability and that part of the change will not have adverse effects on the safety design of the facilities. The examination of the safety design of the reactor facilities cover the reactivity control, new material for the steam generator, design of chemical and volume control systems, design of liquid waste treatment facilities, integration of all confinement vessel spray rings, and design of the diesel power generator. It is confirmed that all of them can meet the safety requirements. Studies and analyses are also made of the emission of radiations to the surrounding environment, abnormal transient changes during operations, and possible accidents. (Nogami, K.)

  3. Design, Results and Plans for Power Beaming Competitive Challenge

    International Nuclear Information System (INIS)

    Shelef, Ben

    2008-01-01

    In our context, Power Beaming refers to the extraction of useable electrical power from a directed electromagnetic beam. In order to promote interest in this technology, the Spaceward Foundation proposed and is managing a technology prize challenge based on a Space Elevator design scenario. The challenge has a prize purse of $2M, provided by NASA's Centennial Challenges office. This paper covers the considerations that went into the design of the challenge, a brief chronology of past results, and plans for the future

  4. The PADE dosimetry system at the Brokdorf nuclear power station

    International Nuclear Information System (INIS)

    Poetter, Karl-Friedrich; Eckelmann, Joerg; Kuegow, Mario; Spahn, Werner; Franz, Manfred

    2002-01-01

    The PADE program system is used in nuclear power plants for personnel and workplace dosimetry and for managing access to the controlled area. On-line interfaces with existing dose determination systems allow collection, surveillance and evaluation functions to be achieved for person-related and workplace-related dose data. This is managed by means of open, non-proprietary communication of PADE with the computer system coupled via interfaces. In systems communication, PADE is limited to main interventions into outside systems, thus ensuring flexible adaptation to existing systems. As a client-server solution, PADE has been developed on the basis of an ORACLE-8 database; the version presented here runs on a Windows NT server. The system described has been used at the Brokdorf Nuclear Power Station since early 2000 and has so far reliably managed more than one million individual access movements of more than 6 000 persons. It is currently being integrated into a comprehensive plant operations management system. Among other things, PADE offers a considerable development potential for a tentatively planned future standardization of parts of the dosimetry systems in German nuclear power plants and for the joint management of in-plant and official dose data. (orig.) [de

  5. Power Relationships that Lead to the Development of Feral Systems

    Directory of Open Access Journals (Sweden)

    D.V Kerr

    2007-09-01

    Full Text Available This research identifies factors affecting the operation of a supply chain in a large, asset rich transport utility, and how a recent Enterprise Resource Planning System (ERP implementation was perceived with respect to its usability for the task. A lack of trust in the ERP, ineffective training methods and complexity in extracting the data from the ERP were identified as a problem which lead to the development of “Feral Systems” (systems outside the accepted ERP or corporation condoned information systems – sometimes called skunkworks. This research uses an interpretative case study approach to gain insights into the human sense-making within the study organisation. The research argues that power relationships between operational managers and financial managers and processual power relationships between operational managers led to the development of these systems.

  6. Simulation for transient stability study of the Taiwan power system - a nuclear majority system

    International Nuclear Information System (INIS)

    Huang, J.C.C.

    1984-01-01

    A transient stability program was developed for the Taiwan Power Company, which has a high proportion of nuclear generation in its power system. This program offers a new territory to investigate nuclear plant effects on the power system transient stability. This program also provides a high speed tool for the Taipower system operational planning. A generalized procedure of synchronous machine modeling for a large-scale stability study is presented. The merits and weaknesses of machine modeling can be comprehended through each item of this procedure. Three types of nonlinear synchronous machine modeling implemented into this stability program are derived by following this procedure. A robust subroutine was derived to perform the fourth order Runge-Kutta integration method, making the software programming neat and systematical. For simulating the nuclear plant influence on the system, this program implemented an additional four functions: load-limit operation simulated by a low-value gate in the governor model, bypass valve capacity monitored by sending out a warning message, rotor overspeed protection relay, and generator anti-motoring relay

  7. Optics Supply Planning System

    International Nuclear Information System (INIS)

    Gaylord, J.

    2009-01-01

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  8. Multi-Temporal Decomposed Wind and Load Power Models for Electric Energy Systems

    Science.gov (United States)

    Abdel-Karim, Noha

    This thesis is motivated by the recognition that sources of uncertainties in electric power systems are multifold and may have potentially far-reaching effects. In the past, only system load forecast was considered to be the main challenge. More recently, however, the uncertain price of electricity and hard-to-predict power produced by renewable resources, such as wind and solar, are making the operating and planning environment much more challenging. The near-real-time power imbalances are compensated by means of frequency regulation and generally require fast-responding costly resources. Because of this, a more accurate forecast and look-ahead scheduling would result in a reduced need for expensive power balancing. Similarly, long-term planning and seasonal maintenance need to take into account long-term demand forecast as well as how the short-term generation scheduling is done. The better the demand forecast, the more efficient planning will be as well. Moreover, computer algorithms for scheduling and planning are essential in helping the system operators decide what to schedule and planners what to build. This is needed given the overall complexity created by different abilities to adjust the power output of generation technologies, demand uncertainties and by the network delivery constraints. Given the growing presence of major uncertainties, it is likely that the main control applications will use more probabilistic approaches. Today's predominantly deterministic methods will be replaced by methods which account for key uncertainties as decisions are made. It is well-understood that although demand and wind power cannot be predicted at very high accuracy, taking into consideration predictions and scheduling in a look-ahead way over several time horizons generally results in more efficient and reliable utilization, than when decisions are made assuming deterministic, often worst-case scenarios. This change is in approach is going to ultimately require new

  9. Power system operational security analysis to obtain sustainable, strategic and economic dispatch

    International Nuclear Information System (INIS)

    Khan, R.A.J.; Alemadi, N.; Mulla, Y.A.; Choudhry, T.M.

    2006-01-01

    This paper addresses the most critical question that is static/online security system n power system operation and managements. Therefore, we do originated couple of models with their operational scenarios. How to identify the main security constraints and their most suitable reinforcements needed to maintain the system security as per determine boundary. It would also render instrumental approach to enhance the security operational constraints. Therefore, it will also provide the system operator to take preventive action or formulate the action plan prior to contingencies occurred In past the both demand side management system and load shedding have been used for to provide reliable power system under normal or emergency operation and control [4,5 J.) (author)

  10. Network development plan 1995

    International Nuclear Information System (INIS)

    Anon.

    1995-11-01

    Network plan 1995 concerns several strategic problems, among others environmental policy of power transmission lines. Possibilities of restructuring aerial cable network are described. The state of the existing systems and plans for new network systems are presented. (EG)

  11. Power Quality in DC Power Distribution Systems and Microgrids

    Directory of Open Access Journals (Sweden)

    Stephen Whaite

    2015-05-01

    Full Text Available This review paper discusses power quality considerations for direct current (DC electric power distribution systems, particularly DC microgrids. First, four selected sample DC architectures are discussed to provide motivation for the consideration of power quality in DC systems. Second, a brief overview of power quality challenges in conventional alternating current (AC distribution systems is given to establish the field of power quality. Finally, a survey of literature addressing power quality issues in DC systems is presented, and necessary power quality considerations in DC distribution system design and operation are discussed.

  12. Power System Analysis

    Science.gov (United States)

    Taniguchi, Haruhito

    Electric power generation that relies on various sources as the primary sources of energy is expected to bring down CO2 emissions levels to support the overall strategy to curb global warming. Accordingly, utilities are moving towards integrating more renewable sources for generation, mostly dispersed, and adopting Smart Grid Technologies for system control. In order to construct, operate, and maintain power systems stably and economically in such background, thorough understanding about the characteristics of power systems and their components is essential. This paper presents modeling and simulation techniques available for the analysis of critical aspects such as thermal capacity, stability, voltage stability, and frequency dynamics, vital for the stable operation of power systems.

  13. Planning for information systems

    CERN Document Server

    King, William R

    2015-01-01

    Edited by one of the best-known and most widely respected figures in the field, ""Planning for Information Systems"" is a comprehensive, single source overview of the myriad ideas and processes that are identified with IS planning. While many chapters deal with high level strategic planning, the book gives equal attention to on-the-ground planning issues.Part I, 'Key Concepts of IS Planning', focuses on how IS planning has evolved over the years; business-IS strategic alignment; and the role of dynamic organizational capabilities in leveraging IS competencies. Part II, 'The Organizational IS P

  14. Incentives and barriers for wind power expansion and system integration in Denmark

    DEFF Research Database (Denmark)

    Hvelplund, Frede; Ostergaard, Poul Alberg; Meyer, Niels I

    2017-01-01

    In Denmark expansion of on-shore, near-shore and off-shore wind power is planned to increase the wind power share to 50% of electricity consumption by 2020. In this situation a continuation of past policies will not suffice, and a dual-track incentive system that both establishes incentives...... for investing in wind power and integration infrastructure with integration between the electricity, heating and transportation sectors, is required. The current Danish taxation system discourages electricity use and works against this integration. Likewise, the current day-ahead electricity spot market...... is not appropriate for a high-wind future as wind reduces price levels, but integration across sectors can partly assist in increasing demand and prices. The European Emission Trading System does not suffice in providing a level playing field for wind power and thus needs a revision. Another barrier for on...

  15. Indicators for management of planned outages in nuclear power plants

    International Nuclear Information System (INIS)

    2006-04-01

    The outages considered within the scope of this publication are planned refuelling outages (PWR and BWR nuclear power plants) and planned outages associated with major maintenance, tests and inspections (PHWR and LWGR nuclear power plants). The IAEA has published some valuable reports providing guidance and assistance to operating organizations on outage management. This TECDOC outlines main issues to be considered in outage performance monitoring and provides guidance to operating organizations for the development and implementation of outage programmes which could enhance plant safety, reliability and economics. It also complements the series of reports published by the IAEA on outage management and on previous work related to performance indicators developed for monitoring different areas of plant operation, such as safety, production, reliability and economics. This publication is based upon the information presented at a technical meeting to develop a standardized set of outage indicators for outage optimization, which was organised in Vienna, 6-9 October 2003. At this meeting, case studies and good practices relating to performance indicator utilization in the process of planned outage management were presented and discussed

  16. Thermoelectric converter for SP-100 space reactor power system

    International Nuclear Information System (INIS)

    Terrill, W.R.; Haley, V.F.

    1986-01-01

    Conductively coupling the thermoelectric converter to the heat source and the radiator maximizes the utilization of the reactor and radiator temperatures and thereby minimizes the power system weight. This paper presents the design for the converter and the individual thermoelectric cells that are the building block modules for the converter. It also summarizes progress on the fabrication of initial cells and the results obtained from the preparation of a manufacturing plan. The design developed for the SP-100 system utilizes thermally conductive compliant pads that can absorb the displacement and distortion caused by the combinations of temperatures and thermal expansion coefficients. The converter and cell designs provided a 100 kWe system which met the system requirements. Initial cells were fabricated and tested. The manufacturing plan showed that the chosen materials and processes are compatible with today's production techniques, that the production volume can readily be achieved and that the costs are reasonable

  17. Techno-economical analysis of innovative technologies in electrical power systems. A feasibility study for a Russian distribution system operator

    International Nuclear Information System (INIS)

    Mueller, Holger; Nikitina, Elena; Makarov, Andrej

    2015-01-01

    Since the liberalization of the energy market in Europe transmission and distribution system operators have been facing fundamentally new challenges when ensuring a safe and reliable power supply. In addition to purely technical criteria economical aspects have become increasingly important in the strategic planning and operation of power systems. As described in this contribution, the results of a feasibility study demonstrate how the use of innovative technologies can make a valuable contribution to improve the economical situation.

  18. Planning ATES systems under uncertainty

    Science.gov (United States)

    Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin

    2015-04-01

    Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions

  19. High performance computing in power and energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Khaitan, Siddhartha Kumar [Iowa State Univ., Ames, IA (United States); Gupta, Anshul (eds.) [IBM Watson Research Center, Yorktown Heights, NY (United States)

    2013-07-01

    The twin challenge of meeting global energy demands in the face of growing economies and populations and restricting greenhouse gas emissions is one of the most daunting ones that humanity has ever faced. Smart electrical generation and distribution infrastructure will play a crucial role in meeting these challenges. We would need to develop capabilities to handle large volumes of data generated by the power system components like PMUs, DFRs and other data acquisition devices as well as by the capacity to process these data at high resolution via multi-scale and multi-period simulations, cascading and security analysis, interaction between hybrid systems (electric, transport, gas, oil, coal, etc.) and so on, to get meaningful information in real time to ensure a secure, reliable and stable power system grid. Advanced research on development and implementation of market-ready leading-edge high-speed enabling technologies and algorithms for solving real-time, dynamic, resource-critical problems will be required for dynamic security analysis targeted towards successful implementation of Smart Grid initiatives. This books aims to bring together some of the latest research developments as well as thoughts on the future research directions of the high performance computing applications in electric power systems planning, operations, security, markets, and grid integration of alternate sources of energy, etc.

  20. Proceedings of the 2008 CIGRE Canada conference on power systems : technology and innovation for the Canadian power grids of the future

    International Nuclear Information System (INIS)

    2008-01-01

    The Conseil International des Grands Reseaux Electriques (CIGRE) promotes technical, economic and environmental developments in electricity transmission and generation. CIGRE Canada is one of 53 national committees of CIGRE. This conference showcased Canadian contributions to the electric power industry and how technology and innovation in the future will influence North American power grids. It provided a forum to discuss technological developments in the electric power industry and present products and services for electrical power systems. Issues concerning the interconnection of non traditional energy sources to the power systems were also discussed along with recent research initiatives related to renewable energy source development. The sessions of the conference were entitled: wind reliability and forecasting; substation automation and communication; human resources and long range planning; power system protection and control; distributed generation; electric vehicles and renewable energy; HVDC and facts; modeling and simulation; markets; overhead transmission lines; and new sensor and de-icing technologies and data management systems. All 68 presentations featured at this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  1. Design of security scheme of the radiotherapy planning administration system based on the hospital information system

    International Nuclear Information System (INIS)

    Zhuang Yongzhi; Zhao Jinzao

    2010-01-01

    Objective: To design a security scheme of radiotherapy planning administration system. Methods: Power Builder 9i language was used to program the system through the model of client-server machine. Oracle 9i was used as the database server. Results In this system, user registration management, user login management, application-level functions of control, database access control, and audit trail were designed to provide system security. Conclusions: As a prototype for the security analysis and protection of this scheme provides security of the system, application system, important data and message, which ensures the system work normally. (authors)

  2. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  3. Construction of a remote radiotherapy planning system

    International Nuclear Information System (INIS)

    Ogawa, Yoshihiro; Nemoto, Kenji; Takahashi, Chiaki; Takai, Yoshihiro; Yamada, Shogo; Seiji, Hiromasa; Sasaki, Kazuya

    2005-01-01

    We constructed a remote radiotherapy planning system, and we examined the usefulness of and faults in our system in this study. Two identical radiotherapy planning systems, one installed at our institution and the other installed at an affiliated hospital, were used for radiotherapy planning. The two systems were connected by a wide area network (WAN), using a leased line. Beam data for the linear accelerator at the affiliated hospital were installed in the two systems. During the period from December 2001 to December 2002, 43 remote radiotherapy plans were made using this system. Data were transmitted using a file transfer protocol (FTP) software program. The 43 radiotherapy plans examined in this study consisted of 13 ordinary radiotherapy plans, 28 radiotherapy plans sent to provide assistance for medical residents, and 2 radiotherapy plans for emergency cases. There were ten minor planning changes made in radiotherapy plans sent to provide assistance for medical residents. Our remote radiotherapy planning system based on WAN using a leased line is useful for remote radiotherapy, with advantages for both radiation oncologists and medical residents. (author)

  4. FY 1998 Report on development of large-scale wind power generation systems. Part 2. Operational research on large-scale wind power generation systems; 1998 nendo ogata furyoku hatsuden system kaihatsu seika hokokusho. 2. Ogata furyoku hatsuden system no unten kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The on-the-spot surveys are conducted and related information is collected for current status of wind power generators connected to power grid systems and simulation techniques therefor in the USA and European countries. In Denmark, the grid system to which wind power generators are connected is a 10kV radiation type system, by which these generators are connected to general consumers. Power quality is investigated by the programs developed by DEFU (Danske Elvarkers Forening Udredning). The German's Norderland Wind Park has the largest capacity in Europe with 35 units of 1.5MW generators. They are connected to a 110kV grind system via ISOREE to control disturbances to the commercial grid system. The USA, used to have the world largest wind power generation capacity, is now plays second fiddle to Germany whose capacity has now exceeded 2,000MW. The country is now seeing the second rush for construction of wind power generators, planning to have a new capacity of 570MW in 1998. Information is also collected from other countries or organizations, including the Netherlands, WREC, Italy and Spain. (NEDO)

  5. FY 1998 Report on development of large-scale wind power generation systems. Part 2. Operational research on large-scale wind power generation systems; 1998 nendo ogata furyoku hatsuden system kaihatsu seika hokokusho. 2. Ogata furyoku hatsuden system no unten kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The on-the-spot surveys are conducted and related information is collected for current status of wind power generators connected to power grid systems and simulation techniques therefor in the USA and European countries. In Denmark, the grid system to which wind power generators are connected is a 10kV radiation type system, by which these generators are connected to general consumers. Power quality is investigated by the programs developed by DEFU (Danske Elvarkers Forening Udredning). The German's Norderland Wind Park has the largest capacity in Europe with 35 units of 1.5MW generators. They are connected to a 110kV grind system via ISOREE to control disturbances to the commercial grid system. The USA, used to have the world largest wind power generation capacity, is now plays second fiddle to Germany whose capacity has now exceeded 2,000MW. The country is now seeing the second rush for construction of wind power generators, planning to have a new capacity of 570MW in 1998. Information is also collected from other countries or organizations, including the Netherlands, WREC, Italy and Spain. (NEDO)

  6. Grid-Tied Photovoltaic Power System

    Science.gov (United States)

    Eichenberg, Dennis J.

    2011-01-01

    A grid-tied photovoltaic (PV) power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. Operating costs of a PV power system are low compared to conventional power technologies. This method can displace the highest-cost electricity during times of peak demand in most climatic regions, and thus reduce grid loading. Net metering is often used, in which independent power producers such as PV power systems are connected to the utility grid via the customers main service panels and meters. When the PV power system is generating more power than required at that location, the excess power is provided to the utility grid. The customer pays the net of the power purchased when the on-site power demand is greater than the onsite power production, and the excess power is returned to the utility grid. Power generated by the PV system reduces utility demand, and the surplus power aids the community. Modern PV panels are readily available, reliable, efficient, and economical, with a life expectancy of at least 25 years. Modern electronics have been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy equal to the modern PV panels. The grid-tied PV power system was successfully designed and developed, and this served to validate the basic principles developed, and the theoretical work that was performed. Grid-tied PV power systems are reliable, maintenance- free, long-life power systems, and are of significant value to NASA and the community. Of particular value are the analytical tools and capabilities that have been successfully developed. Performance predictions can be made confidently for grid-tied PV systems of various scales. The work was done under the NASA Hybrid Power Management (HPM