WorldWideScience

Sample records for power supply installations

  1. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  2. Process computers automate CERN power supply installations

    International Nuclear Information System (INIS)

    Ullrich, H.; Martin, A.

    1974-01-01

    Higher standards of performance and reliability in the power plants of large particle accelerators necessitate increasing use of automation. The CERN (European Nuclear Research Centre) in Geneva started to employ process computers for plant automation at an early stage in its history. The great complexity and extent of the plants for high-energy physics first led to the setting-up of decentralized automatic systems which are now being increasingly combined into one interconnected automation system. One of these automatic systems controls and monitors the extensive power supply installations for the main ring magnets in the experimental zones. (orig.) [de

  3. Trim coil power supplies

    International Nuclear Information System (INIS)

    Haisler, R.; Peeler, H.; Zajicek, W.

    1985-01-01

    The 18 trim coil power supplies have been constructed and are now in place in the K500 pit and pit mezzanine. Final wiring of the primary power and control power is proceeding along with installation of cooling water supplies. The supplies are expected to be ready for final testing into resistive loads at the beginning of June, 1985

  4. Air intake device for at least one stand-by aggregate installed in an emergency power supply building

    International Nuclear Information System (INIS)

    Stoll, A.; Schilling, R.

    1980-01-01

    Stand-by aggregates are installed in an energency power supply building in order to ensure the cooling of nuclear power plants during accidents. In order to assure the stand-by aggregates to be supplied with combustion air also in the case of fire, each stand-by aggregate is provided with two intake pipes for the combustion air, which are horizontally lead through the building wall on the opposite sides of the energency power supply building. Fire valves are incorporated in the inlet pipes, and one of them will always close in the case of fire. (orig.) [de

  5. Electrical Power Supply to Offshore Oil Installations by High Voltage Direct Current Transmission

    Energy Technology Data Exchange (ETDEWEB)

    Myhre, Joergen Chr.

    2001-07-01

    This study was initiated to investigate if it could be feasible to supply offshore oil installations in the North Sea with electrical power from land. A prestudy of alternative converter topologies indicated that the most promising solution would be to investigate a conventional system with reduced synchronous compensator rating. The study starts with a summary of the state of power supply to offshore installations today, and a short review of classical HVDC transmission. It goes on to analyse how a passive network without sources influences the inverter. The transmission, with its current controlled rectifier and large inductance, is simulated as a current source. Under these circumstances the analysis shows that the network frequency has to adapt in order to keep the active and reactive power balance until the controllers are able to react. The concept of firing angle for a thyristor is limited in a system with variable frequency, the actual control parameter is the firing delay time. Sensitivity analysis showed some astonishing consequences. The frequency rises both by an increase in the active and in the reactive load. The voltage falls by an increase in the active load, but rises by an increase in the inductive load. Two different control principles for the system of inverter, synchronous compensator and load are defined. The first takes the reference for the firing delay time from the fundamental voltage at the point of common coupling. The second takes the reference for the firing delay time from the simulated EMF of the synchronous compensator. Of these, the second is the more stable and should be chosen as the basis for a possible control system. Two simulation tools are applied. The first is a quasi-phasor model running on Matlab with Simulink. The other is a time domain model in KREAN. The time domain model is primarily used for the verification of the quasi-phasor model, and shows that quasi-phasors is still a valuable tool for making a quick analysis

  6. 24 CFR 3280.803 - Power supply.

    Science.gov (United States)

    2010-04-01

    ...-Wiring Devices-Dimensional Specifications). (g) The overall length of a power-supply cord, measured from... supply shall be by means of: (1) One mast weatherhead installation installed in accordance with Article... underside of the manufactured home. The manufacturer shall provide in his written installation instructions...

  7. Maintenance management of emergency power supply equipment (uninterruptible power supply) in Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Nishida, Kyosuke; Hiyama, Hisao; Shibata, Satomi; Iwasaki, Shogo; Inami, Shinichi

    2009-01-01

    Uninterruptible power supply systems are installed in the Tokai reprocessing plant in preparation for the emergency case that the commercial power supply is stopped by an accidental or intentional interruption in the supply of electricity. The uninterruptible power supply system particularly provides a temporary power source to the important devices for the radiation control of nuclear critical monitoring in the plant. Thus, the system is potentially important and essential for nuclear plants. The paper reports the current activities such as regular inspections, replacement of parts and system update, to maintain the function of uninterruptible power supply systems. (author)

  8. 49 CFR 236.516 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Power supply. 236.516 Section 236.516..., Train Control and Cab Signal Systems Standards § 236.516 Power supply. Automatic cab signal, train stop, or train control device hereafter installed shall operate from a separate or isolated power supply...

  9. 47 CFR 80.1015 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Power supply. 80.1015 Section 80.1015... MARITIME SERVICES Radiotelephone Installations Required by the Bridge-to-Bridge Act § 80.1015 Power supply. (a) There must be readily available for use under normal load conditions, a power supply sufficient...

  10. Power supply for nuclear power plant home consumption using inverter sources

    International Nuclear Information System (INIS)

    Stepar, V.; Tvrdik, J.

    1988-01-01

    A description is presented of the system configuration of a nuclear power plant with WWER-440 and WWER-1000 units and of a system of guaranteed power supply for the plant home consumption network for a WWER-440 power plant. The power supply network consists of 6 inverter supplies for safety systems, 4 supplies for nonsystem facilities and of a minimum of three power supplies for facilities outside the units. A diagram is shown and the principle described of the currently used ABP 1500 power supply system of Soviet origin. Using the experience from its operation, a Czechoslovak inverter supply system was designed featuring parallel operation of the inverter units. The principles are given for the design of a power supply system of an output of 75 kVA, the diagram is shown and the principle described. The design allows implementing and using the system without redundancy or in redundant operation of the 2 from 3 type at an installed capacity of 66%, or of the 1 from 2 type at an installed capacity of 50% of the output. The system is undergoing tests that should verify its reliability. (J.B.). 3 figs., 1 tab

  11. SNS AC Power Distribution and Reliability of AC Power Supply

    CERN Document Server

    Holik, Paul S

    2005-01-01

    The SNS Project has 45MW of installed power. A design description under the Construction Design and Maintenance (CDM) with regard to regulations (OSHA, NFPA, NEC), reliability issues and maintenance of the AC power distribution system are herewith presented. The SNS Project has 45MW of installed power. The Accelerator Systems are Front End (FE)and LINAC KLYSTRON Building (LK), Central Helium Liquefier (CHL), High Energy Beam Transport (HEBT), Accumulator Ring and Ring to Target Beam Transport (RTBT) Support Buildings have 30MW installed power. FELK has 16MW installed, majority of which is klystron and magnet power supply system. CHL, supporting the super conducting portion of the accelerator has 7MW installed power and the RING Systems (HEBT, RING and RTBT) have also 7MW installed power.*

  12. 47 CFR 80.917 - Reserve power supply.

    Science.gov (United States)

    2010-10-01

    ... power supply must be adequately treated to prevent freezing or overheating consistent with the season... 47 Telecommunication 5 2010-10-01 2010-10-01 false Reserve power supply. 80.917 Section 80.917... MARITIME SERVICES Compulsory Radiotelephone Installations for Small Passenger Boats § 80.917 Reserve power...

  13. 46 CFR 169.688 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...

  14. AGS tune jump power supply design and test

    International Nuclear Information System (INIS)

    Mi, J.; Glenn, J.W.; Huang, H.; Marneris, I.; Rosas, P.; Sandberg, J.; Tan, Y.; Zhang, W.

    2011-01-01

    A horizontal tune jump system has been installed to overcome the horizontal intrinsic spin resonances, which requires jumping the horizontal tune 0.04 units 82 times, 41 up and 41 down. Two quadruple magnets have been installed in AGS ring to perform this. The pulsed magnet current ranges from about 140A near injection to about 1400A later. The current pulse rise and fall time are around 100uS and flat tops time is around 4mS. These quadruples have separated supplies. This tune jump pulse power supply employees all semiconductor parts as well as the main switches. During dummy load and magnet testing, the test results showed that the power supply could meet the specification. This article will describe some details of power supply simulation, design and testing. Some test waveforms and pictures are presented in this paper.

  15. Electricity supplies in a French nuclear power station

    International Nuclear Information System (INIS)

    2011-01-01

    As the operation of a nuclear power station requires a power supply system enabling this operation as well as the installation safety, this document describes how such systems are designed in the different French nuclear power stations to meet the requirements during a normal operation (when the station produces electricity) or when it is stopped, but also to ensure power supply to equipment ensuring safety functions during an incident or an accident occurring on the installation. More precisely, these safety functions are provided by two independent systems in the French nuclear power stations. Their operation is briefly described. Two different types of nuclear reactors are addressed: pressurised water reactors (PWR) of second generation, EPR (or PWR of third generation)

  16. Investigation And Mitigation Techniques Of Power Quality Problems In Nuclear Installations

    International Nuclear Information System (INIS)

    Ayad, N.; Elsherbiny, E.; Eleissawi, H.; Zaher, M.; AbdelSalam, G.

    2013-01-01

    The electrical power systems are exposed to different types of power quality disturbances problems. Investigation and monitoring of power quality is necessary to maintain accurate operation of sensitive equipment especially for nuclear installations. The present research discusses investigation and monitoring of power quality problems for the electrical sources of nuclear installations. Field power quality data is collected by power analyzer and analyzed with reference to power quality standards. There were several disturbances exceeded the thresholds, they were voltage harmonics and voltage flicker. Mitigation techniques were suggested to install a passive filter at low voltage side and all sensitive and critical loads should be isolated and fed through uninterruptible power supply (UPS)

  17. Solid state modulator for klystron power supply XFEL TDS INJ

    Science.gov (United States)

    Zavadtsev, A. A.; Zavadtsev, D. A.; Zybin, D. A.; Churanov, D. V.; Shemarykin, P. V.

    2016-09-01

    The transverse deflecting system XFEL TDS INJ for European X-ray Free Electron Laser includes power supply for the CPI VKS-8262HS klystron. It has been designed for pulse high-voltage, cathode heating, solenoid and klystron ion pump. The klystron power supply includes solid state modulator, pulse transformer, controlled power supply for cathode heating and commercial power supplies for solenoid and ion pump. Main parameters of the modulator are 110 kV of peak voltage, 72 A peak current, and pulse length up to 6 μs. The klystron power supply has been developed, designed, manufactured, tuned, tested and installed in the XFEL building. All designed parameters are satisfied.

  18. DAΦNE magnet power supply system

    International Nuclear Information System (INIS)

    Ricci, R.; Sanelli, C.; Stecchi, A.

    1998-01-01

    The e + -e - , 1020 MeV at center of mass, Particle Accelerator Complex DAΦNE, consists of a linear accelerator (Linac), a damping ring (D.A.), nearly 180 m of transfer lines (T.L.) and two storage rings (S.R.), that intersect each other in two points (I.P.), for Φ particle production. The D.A., T.L. and S.R. magnets are powered by means of 462 power supplies, rating from 100 W to 1 MW. The very different output currents, from 10 A to 2300 A, and output voltages, from 8 V to 1300 V, imposed many different technical solution realized by the world industry. This paper describes the Power Supply System giving also a description of the different typologies, their characteristics and control systems. The paper reports also the power supply performances and gives information on their installation and first year operation period

  19. Digital signal array processor for NSLS booster power supply upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second. To accomplish this, new power supplied for the dipole, quadrupole, and sextupole have been installed. This paper will outline the design and function of the digital signal processor used as the primary control element in the power supply control system

  20. SPEAR3 DC MAGNET POWER SUPPLIES - AN OVERVIEW

    International Nuclear Information System (INIS)

    De Lira, A.

    2004-01-01

    The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR 3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003. This paper presents an overview and descriptions of the DC magnet power supplies. These consist of tightly-regulated ((le) 10 ppm) current sources ranging in output from 30 A to 800 A and output power ranging from a few watts to almost 1.0 MW. A total of 226 magnet power supplies are in successful operation. The SPEAR 3 upgrade performance and reliability requirements mandated new power supplies for both the SPEAR 3 storage ring, and for the booster-to-SPEAR 3 (BTS) transport line. A large variety of precise, highly stable current power supplies were needed to fill the diverse magnet needs. Also described are outside procurement aspects, in-house construction, installation, testing, performance and operation of the power supplies. During field testing, special emphasis was made to ensure a critically damped response on the current loop. Frequency spectra measurements were made for reference and future diagnostics

  1. Automation of Aditya tokamak plasma position control DC power supply

    Energy Technology Data Exchange (ETDEWEB)

    Arambhadiya, Bharat, E-mail: bharat@ipr.res.in; Raj, Harshita; Tanna, R.L.; Edappala, Praveenlal; Rajpal, Rachana; Ghosh, Joydeep; Chattopadhyay, P.K.; Kalal, M.B.

    2016-11-15

    Highlights: • Plasma position control is very essential for obtaining repeatable high temperature, high-density discharges of longer durations in tokomak. • The present capacitor bank has limitations of maximum current capacity and position control beyond 200 ms. • The installation of a separate set of coils and a DC power supply can control the plasma position beyond 200 ms. • A high power thyristor (T588N1200) triggers for DC current pulse of 300 A fires precisely at required positions to modify plasma position. • The commissioning is done for the automated in-house, quick and reliable solution. - Abstract: Plasma position control is essential for obtaining repeatable high temperature, high-density discharges of longer duration in tokamaks. Recently, a set of external coils is installed in the vertical field mode configuration to control the radial plasma position in ADITYA tokamak. The existing capacitor bank cannot provide the required current pulse beyond 200 ms for position control. This motivated to have a DC power supply of 500 A to provide current pulse beyond 200 ms for the position control. The automatization of the DC power supply mandated interfaces with the plasma control system, Aditya Pulse Power supply, and Data acquisition system for coordinated discharge operation. A high current thyristor circuit and a timer circuit have been developed for controlling the power supply automatically for charging vertical field coils of Aditya tokamak. Key protection interlocks implemented in the development ensure machine and occupational safety. Fiber-optic trans-receiver isolates the power supply with other subsystems, while analog channel is optically isolated. Commissioning and testing established proper synchronization of the power supply with tokamak operation. The paper discusses the automation of the DC power supply with main circuit components, timing control, and testing results.

  2. Accelerator-control-system interface for intelligent power supplies

    International Nuclear Information System (INIS)

    Cohen, S.

    1992-01-01

    A number of high-current high-precision magnet power supplies have been installed at the proton storage ring at the Los Alamos National Laboratory Accelerator Complex. The units replace existing supplies, powering large dipole magnets in the ring. These bending magnets require a high-current supply that is precise and stable. The control and interface design for these power supplies represents a departure from all others on-site. The supplies have sophisticated microprocessor control on-board and communicate with the accelerator control system via RS-422 (serial communications). The units, built by Alpha Scientific Electronics, Hayward, CA use a high-level ASCII control protocol. The low-level ''front-end'' software used by the accelerator control system has been written to accommodate these new devices. They communicate with the control system through a terminal server port connected to the site-wide ethernet backbone. Details of the software implementation for the analog and digital control of the supplies through the accelerator control system will be presented

  3. Upgrade of DC power supply system in ITER CS model coil test facility

    International Nuclear Information System (INIS)

    Shimono, Mitsugu; Uno, Yasuhiro; Yamazaki, Keita; Kawano, Katsumi; Isono, Takaaki

    2014-03-01

    Objective of the ITER CS Model Coil Test Facility is to evaluate a large scale superconducting conductor for fusion using the Central Solenoid (CS) Model Coil, which can generate a 13T magnetic field in the inner bore with a 1.5 m diameter. The facility is composed of a helium refrigerator / liquefier system, a DC power supply system, a vacuum system and a data acquisition system. The DC power supply system supplies currents to two superconducting coils, the CS Model Coil and an insert coil. A 50-kA DC power supply is installed for the CS Model Coil and two 30 kA DC power supplies are installed for an insert coil. In order to evaluate superconducting performance of a conductor used for ITER Toroidal Field (TF) coils whose operating current is 68 kA, the line for an insert coil is upgraded. A 10 kA DC power supply was added, DC circuit breakers were upgraded, bus bars and current measuring instrument were replaced. In accordance to the upgrade, operation manual was revised. (author)

  4. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  5. Nuclear steam supply system and method of installation

    International Nuclear Information System (INIS)

    Tower, S.N.; Christenson, J.A.; Braun, H.E.

    1989-01-01

    This patent describes a method of providing a nuclear reactor power plant at a predetermined use site accessible by predetermined navigable waterways. The method is practiced with apparatus including a nuclear reactor system. The system has a nuclear steam-supply section. The method consists of: constructing a nuclear reactor system at a manufacturing site remote from the predetermined use site but accessible to the predetermined waterways for transportation from the manufacturing site to the predetermined use site, the nuclear reactor system including a barge with the nuclear steam supply section constructed integrally with the barge. Simultaneously with the construction of the nuclear reactor system, constructing facilities at the use site to be integrated with the nuclear reactor system to form the nuclear-reactor power plant; transporting the nuclear reactor system along the waterways to the predetermined use site; at the use site joining the removal parts of the altered nuclear reactor system to the remainder of the altered nuclear reactor system to complete the nuclear reactor system; and installing the nuclear reactor system at the predetermined use site and integrating the nuclear reactor system to interact with the facilities constructed at the predetermined use site to form the nuclear-reactor power plant

  6. New intelligent magnet power supplies for LAMPF

    International Nuclear Information System (INIS)

    Cohen, S.; Sturrock, J.

    1991-01-01

    New magnet power supplies are scheduled to be installed in the proton linac at the Clinton P. Anderson Meson Physics Facility (LAMPF). The control and interface design of these power supplies represents a departure from all others onsite. A high-level ASCII control protocol has been designed. The supplies have sophisticated microprocessor control onboard and communicate with the accelerator control system via RS-422 (serial communications). The low-level software used by the accelerator control system is currently being rewritten to accommodate these new devices. They will communicate with the control system through a terminal server port connected to the site-wide ethernet backbone. This means that each supply will, for all intents and purposes, be a network object. Details of the design strategies for the analog and digital control for these supplies as well as the control protocol interface will be presented. 5 refs., 5 figs., 1 tab

  7. An analysis of control scheme and test results of fast feedback power supply

    International Nuclear Information System (INIS)

    Gupta, Shivam Kumar; Gupta, C.N.; Shah, Kunal; Makwana, Moti

    2017-01-01

    Real time Plasma Position Control is essential for obtaining long duration plasma in tokamaks. For that purpose four external coils has been installed in toroidal direction. Magnetic field of these coils interact with the plasma and tries to keep it radially stable in vacuum vessel to avoid direct contact of plasma to wall of tokamak. A fast feedback power supply has been installed in Aditya Tokamak which is able to set the appropriate current in either direction and current magnitude in external coils on the fast scale. In this paper, an analysis of control scheme and testing of Fast Feedback Power Supply (FFPS) has been described. FFPS is IGBT based H-bridge inverter programmable power supply

  8. Early operating and reliability experience with the CEBAF DC magnet power supplies

    International Nuclear Information System (INIS)

    Merz, W.; Flood, R.; Martin, E.J.; O'Sullivan, M.

    1996-01-01

    The CEBAF accelerator is a five pass, recirculating, CW electron linear accelerator. There are a total of nine recirculation arcs connecting the two linacs. Three experimental halls are serviced by the accelerator through separate transport channels. The magnet powering system for CEBAF consists of approximately 2000 independent control channels. About 1850 of these channels are low current, trim magnet power supplies. There are 28 higher power supplies used to energize the major bending elements. Over one hundred, 20 amp, active shunts are used to vary current in selected magnets in the major dipole strings. The majority of the magnetic elements are concentrated in the arcs and transport channels. The correction dipoles, quadrupoles and sextupoles are each powered individually be a dedicated trim power supply channel. The arc and extraction channel dipoles are powered in series strings by the high powered supplies, known locally at CEBAF as 'box power supplies'. Arc loads consist of some 30--40 magnets in series. Transport channel, path length control doglegs and septa box power supplies have loads ranging from 1 to 10 magnets. Shunts are installed on virtually all loads where two or more magnets are in series. At this time, 95% of the power supplies are installed and commissioned. In the past twelve months, beginning in May 1994, approximately 1200 trim magnet power supplies have been checked out. During this same period approximately 22 box power supplies and 100 shunts have been made operational. Full operation of the equipment has only been under way since early 1995. While this operation is only just beginning, much has been learned based on the reliability performance seen so far. The remainder of this paper describes the systems mentioned, their reliability problems, the fixes implemented to date, and some plans for the future. 6 refs., 3 tabs

  9. Final installation and testing of the feedback power amplifier for the Scyllac feedback experiment

    International Nuclear Information System (INIS)

    Kutac, K.J.; Kewish, R.W. Jr.; Gribble, R.F.; Rawcliffe, A.S.; Miller, G.; Kemp, E.L.; Bartsch, R.R.

    1975-01-01

    The Scyllac feedback system consists of eight subsystems. The installation and testing of the many components and eight subsystems are described. The eight subsystems are: (1) ML-8618 power amplifiers; (2) dc plate and bias power supplies; (3) ac filament power supplies; (4) position detector and signal processor (intermediate amplifier); (5) l = 0 and l = 2 output load coils; (6) control system and interlock system; (7) computer controlled analog-to-digital transient recorders; and (8) cable distribution and cooling-water supply system

  10. Control system for magnet power supplies for Novosibirsk free electron laser

    International Nuclear Information System (INIS)

    Velikanov, Y.M.; Veremeenko, V.F.; Vinokurov, N.A.; Galt, A.A.; Dovzhenko, B.A.; Kozak, V.R.; Kuper, E.A.; Medvedev, L.E.; Medvedko, A.S.; Serednyakov, S.S.

    2012-01-01

    A high-power free electron laser (FEL) based on the accelerator-recuperator principle is being built in Budker Institute (Russia). The magnetic system of the FEL is an important part of the installation. It consists of many magnetic elements of different types: bending magnets, quadrupole lenses and correctors. The windings of all these elements are fed from DC current power supplies. The power supply control system based on embedded intelligent controllers with the CAN-BUS interface is considered in detail. The control software structure and capabilities are described. Besides, the software tools for power supply diagnostics are described

  11. Increased power supplied to the shelf from land

    International Nuclear Information System (INIS)

    2002-01-01

    The report analyses how increasing the power supply from land to the offshore installations will affect the emissions of carbon dioxide from the power production on land. For the time being the CO 2 emissions from the production in existing power plants outside Norway will increase. Since the power price also rises, this checks the rise in consumption. This means that the total emission of carbon dioxide does not increase as much as it would have done if the power supply to the shelf had been covered entirely by increased production in existing coal power plants. If in the long term new conventional gas power capacity can be developed commercially, then increased power supply to the shelf will cause the CO 2 emission from power production on land in Norway to increase. Should conventional gas power plants not be granted concession, then the effect will be to increase the power production in existing plants in other countries and to check the rise in consumption. The net rise in consumption increases the emission of carbon dioxide from production in coal, oil, or gas power plants in Denmark, Finland, Germany or Poland

  12. DIII-D power supply, design, and development

    International Nuclear Information System (INIS)

    Nerem, A.

    1995-02-01

    An overview of the DIII-D power supply system with information details concerning the configuration, power ratings, acquisition costs, and cost scaling relevant to the design of ITER and other tokamaks is presented. The power supplies for the DIII-D tokamak were installed and commissioned during the late 1970's and the beginning of the 1980's. Several upgrades have been implemented during the last two years to solve increasing reliability problems encountered as the equipment aged, to provide enhanced operational flexibilities, and to enable operation at the higher power levels needed to provide experimental data relevant to the ITER and TPX design activities. These upgrades ranged from redesign of the power supply control systems to the replacement of vacuum circuit breakers which had become unreliable in service. A new interlock and protection system has also been implemented using the latest programmable logic controllers (PLC) and computer technology. These upgrades have been highly successful and are described to provide insight to many issues in the specification of high power converters. Power supply models used in the design of the DIII-D Plasma Control System are also described along with model verification test data. These models are being used in the development of a new advanced plasma control system for the DIII-D tokamak. Recent operational experience and results are presented

  13. Dual Power Supplies for PEP-II Injection Kickers

    CERN Document Server

    Olszewski, Joseph; Iverson, Richard; Kulikov, Artem; Pappas, Chris

    2005-01-01

    Originally the PEP-II injection kickers where powered by one power supply. Since the kicker magnets where not perfectly matched, the stored beam got excited by about 7% of the maximum kicker amplitude. This led to luminosity losses which were especially obvious for trickle injection when the detector is on for data taking. Therefore two independant power supplies with thyratrons in the tunnel next to the kicker magnet were installed. This also reduces the necessary power by about a factor of five since there are no long cables that have to be charged. The kickers are now independantly adjustable to eliminate any non-closure of the kicker system and therefore excitation of the stored beam. Setup, commissioning and fine tuning of this system are discussed.

  14. Dual Power Supplies for PEP-II Injection Kickers

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, J; Decker, F.-J.; Iverson, R.H.; Kulikov, A.; Pappas, C.; /SLAC

    2005-05-25

    Originally the PEP-II injection kickers were powered by one power supply. Since the kicker magnets where not perfectly matched, the stored beam got excited by about 7% of the maximum kicker amplitude. This led to luminosity losses which were especially obvious for trickle injection when the detector is on for data taking. Therefore two independent power supplies with thyratrons in the tunnel next to the kicker magnet were installed. This also reduces the necessary power by about a factor of four since there are no long cables that have to be charged. The kickers are now independently adjustable to eliminate any non-closure of the kicker system and therefore excitation of the stored beam. Setup, commissioning and fine tuning of this system are discussed.

  15. Dual Power Supplies for PEP-II Injection Kickers

    International Nuclear Information System (INIS)

    Olszewski, J; Decker, F.-J.; Iverson, R.H.; Kulikov, A.; Pappas, C.; SLAC

    2005-01-01

    Originally the PEP-II injection kickers were powered by one power supply. Since the kicker magnets where not perfectly matched, the stored beam got excited by about 7% of the maximum kicker amplitude. This led to luminosity losses which were especially obvious for trickle injection when the detector is on for data taking. Therefore two independent power supplies with thyratrons in the tunnel next to the kicker magnet were installed. This also reduces the necessary power by about a factor of four since there are no long cables that have to be charged. The kickers are now independently adjustable to eliminate any non-closure of the kicker system and therefore excitation of the stored beam. Setup, commissioning and fine tuning of this system are discussed

  16. New design for the anode power supply of a gyrotron

    International Nuclear Information System (INIS)

    Fasel, D.; Alberti, S.; Favre, A.; Perez, A.; Acero, J.; Ganuza, D.; Garcia, I.; Lucia, C.

    1998-01-01

    The introduction will remind the main supply structure installed in the CRPP, related to the ECRH (Electron Cyclotron Resonance Heating) project on the TCV (Tokamak Configuration Variable) tokamak. Then this paper concentrates on the description of the power source designed to supply the anode of the triode type gyrotron. First the requirements asked for this power supply will be presented, taking into account the possible feeding structures in relation with the existing HV DC cathode power supply. The following section will focus on the selected design, describing in details the power structure based on MOSFET, referred to the cathode potential. Afterwards the control electronics is presented, including the feedback control implemented, the HV measurements, the internal reference generator and the interface to the TCV control. Finally, the last section will give information on the project status. (author)

  17. Software environment and configuration for the DSP controlled NSLS booster power supplies

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second by means of the installation of new dipole, quadrupole, and sextupole power supplies. The control system of these power supplies employs general purpose digital signal processing modules, and therefore, software support is required. This paper outlines the development system configuration, and the software environment

  18. VG-400 atomic power and technological installation. Possible core design

    International Nuclear Information System (INIS)

    Komarov, E.V.; Laptev, F.V.; Lyubivyj, A.G.; Mitenkov, F.M.; Samojlov, O.B.; Sukhachevskij, Yu.B.

    1979-01-01

    The main characteristics, basic circuit and configuration of equipment of the VG-400 atomic power and technological installation are considered. This installation is intended for supplying with highly-potential heat of thermal electrochemical hydrogen production and for power generation in the steam-turbine cycle. The main installation characteristics: HTGR reactor heat power 1100 MW, electric power 300 MW, helium coolant pressure 50 atm, output temperature 950 deg C, steam pressure in the second contour 175 atm, temperature 535 deg C, core diameter and height 6.4 m and 4 m, respectively, number of spherical fuel elements 8.5x10 5 . The installation can ensure hydrogen production of 10 5 Nxm 3 /h. For the VG-400 reactor block the integral arrangement of the first circuit equipment in the reinforced concrete is chosen. Two versions of the reactor core with prismatic and spherical fuel elements are compared. It is shown that taking into account great potentialities of the spherical zone in a case of further temperature increase and its positive qualities with respect to construction and processing of fuel elements and graphite blocks, the utilization of simplier units and mechanisms in the overloading system and in the process of profiling of energy distribution the choice of the spherical configuration for the VG-400 pilot plant installation seems to be valid

  19. Combined installation of electric and heat supply for climatic conditions of Iraq

    Science.gov (United States)

    Kaisi, Osama Al; Sidenkov, D. V.

    2017-11-01

    Electricity, heating and cooling are the three main components that make up the energy consumption base in residential, commercial and public buildings around the world. Demand for energy and fuel costs are constantly growing. Combined cooling, heating and power generation or trigeneration can be a promising solution to such a problem, providing an efficient, reliable, flexible, competitive and less harmful alternative to existing heat and cold supply systems. In this paper, scheme of the tri-generation plant on non-aqueous working substances is considered as an installation of a locally centralized electro-heat and cold supply of a typical residential house in a hot climate. The scheme of the combined installation of electro-heat (cold) supply consisted of the vapor power plant and heat pump system on low-boiling working substance for local consumers under the climatic conditions of Iraq is presented. The possibility of using different working substances in the thermodynamic cycles of these units, which will provide better efficiency of such tri-generation systems is shown. The calculations of steam turbine cycles and heat pump part on the selected working substances are conducted. It is proposed to use heat exchangers of plate type as the main exchangers in the combined processing. The developed method of thermal-hydraulic calculation of heat exchangers implemented in MathCad, which allows to evaluate the efficiency of plants of this type using the ε - NTU method. For the selected working substances of the steam part the optimal temperature of heat supply to the steam generator is determined. The results of thermodynamic and technical-economic analysis of the application of various working substances in the “organic” Rankine cycle of the steam turbine unit and the heat pump system of the heat and cold supply system are presented.

  20. Geothermal Power Supply Systems around the World and in Russia: State of the Art and Future Prospects

    Science.gov (United States)

    Butuzov, V. A.; Amerkhanov, R. A.; Grigorash, O. V.

    2018-05-01

    Solar and geothermal energy systems are shown to have received the widest use among all kinds of renewable sources of energy for heat supply purposes around the world. The power capacities and amounts of thermal energy generated by solar and geothermal heat supply systems around the world are presented by way of comparison. The thermal power capacity of solar heat supply systems installed around the world as of 2015 totaled 268.1 GW, and the thermal energy generated by them amounted to 225 TW h/year. The thermal power capacity of geothermal heat supply systems installed around the world totaled 70.3 GW, and the thermal energy generated by them amounted to 163 TW h/year. Information on the geothermal heat supply systems in the leading countries around the world based on the data reported at the World Geothermal Congress held in 2015 is presented. It is shown that China, with the installed thermal power capacities of its geothermal heat supply stations totaling 17.87 GW and the amount of thermal energy generated per annum equal to 48.435 TW h/year, is the world's leader in this respect. The structures of geothermal heat supply systems by the kinds of heat consumption used around the world are presented. The systems equipped with geothermal heat pumps accounted for 70.95% in the total installed capacity and for 55.3% in the total amount of generated heat. For systems that do not use heat pumps, those serving for pools account for the largest share amounting to 44.74% in installed capacity and to 45.43% in generated heat. A total of 2218 geothermal wells with the total length equal to 9534 km (with 38.7% of them for heat supply purposes) were drilled in 42 countries in the period from 2010 to 2014. In Russia, geothermal heat supply systems are in operation mainly in Dagestan, in Krasnodar krai, and in Kamchatka. The majority of these systems have been made without breaking the stream after the well outlet. A cyclic control arrangement is also used. The combined

  1. Alternative power supply systems for remote industrial customers

    Science.gov (United States)

    Kharlamova, N. V.; Khalyasmaa, A. I.; Eroshenko, S. A.

    2017-06-01

    The paper addresses the problem of alternative power supply of remote industrial clusters with renewable electric energy generation. As a result of different technologies comparison, consideration is given to wind energy application. The authors present a methodology of mean expected wind generation output calculation, based on Weibull distribution, which provides an effective express-tool for preliminary assessment of required installed generation capacity. The case study is based on real data including database of meteorological information, relief characteristics, power system topology etc. Wind generation feasibility estimation for a specific territory is followed by power flow calculations using Monte Carlo methodology. Finally, the paper provides a set of recommendations to ensure safe and reliable power supply for the final customers and, subsequently, to provide sustainable development of the regions, located far from megalopolises and industrial centres.

  2. PEP-II Large Power Supplies Rebuild Program at SLAC

    CERN Document Server

    de Lira, Antonio C; Lipari, James J; da Silva Rafael, Fernando

    2005-01-01

    At PEP-II, seven large power supplies (LGPS) are used to power quad magnets in the electron-positron collider region. The LGPS ratings range from 72kW to 270kW, and were installed in 1997. They are unipolar off-line switch mode supplies, with a 6 pulse bridge rectifying 480VAC, 3-phase input power to yield 650VDC unregulated. This unregulated 650VDC is then input into one (or two) IGBT H-bridges, which convert the DC into PWM 16 kHz square wave AC. This high frequency AC drives the primary side of a step-down transformer followed by rectifiers and low pass filters. Over the years, these LGPS have presented many problems mainly in their control circuits, making it difficult to troubleshoot and affecting the overall accelerator availability. A redesign/rebuilding program for these power supplies was established under the coordination of the Power Conversion Department at SLAC. During the 2004 accelerator summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control b...

  3. Sustaining neutral beam power supply system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Eckard, R.D.; Van Ness, H.W.

    1979-01-01

    A fixed-price procurement contract for $24.9 million was awarded to Aydin Energy Division, Palo Alto, CA, for the design, manufacture, installation, and acceptance testing of the sustaining neutral beam power supply system (SNBPSS). This system is scheduled for completion in early 1981 and will provide the conditioned power for the 24 neutral beam source modules. Each of the 24 power supply sets will provide the accel potential of 80 kV at 88 A, the arc power, the filament power, and the suppressor power for its associated neutral beam source module

  4. Sustaining neutral beam power supply system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Eckard, R.D.; Wilson, J.H.; Van Ness, H.W.

    1980-01-01

    In late August 1978, a fixed price procurement contract for $25,000,000 was awarded to Aydin Energy Division, Palo Alto, California, for the design, manufacture, installation and acceptance testing of the Lawrence Livermore National Laboratory Mirror Fusion Test Facility (MFTF) Sustaining Neutral Beam Power Supply System (SNBPSS). This system of 24 power supply sets will provide the conditioned power for the 24 neutral beam source modules. Each set will provide the accel potential the arc power, the filament power, and the suppressor power for its associated neutral beam source module. The design and development of the SNBPSS has progressed through the final design phase and is now in production. Testing of the major sub-assembly power supply is proceeding at Aydin and the final acceptance testing of the first two power supplies at LLNL is expected to be completed this year

  5. Smart Power Supply Systems for Mission Critical Facilities

    Science.gov (United States)

    Hirose, Keiichi; Babasaki, Tadatoshi

    To develop the advanced and rich life, and the also economy and social activity continuously, various types of energy are necessary. At the same time, to protect the global environment and to prevent the depletion of natural resources, the effective and moreover efficient use of energy is becoming important. Electric power is one of the most important forms of energy for our life and society. This paper describes topics and survey results of technical trends regarding the electric power supply systems which are playing a core role as the important infrastructure to support the emergence of information-oriented society. Specifically, the power supply systems that enhance high power quality and reliability (PQR) are important for the steady growth of information and communication services. The direct current (DC) power, which has been used for telecommunications power systems and information and communications technologies (ICT), enables existing utilities' grid and distributed energy resources to keep a balance between supply and demand of small-scaled power systems or microgirds. These techniques are expected to be part of smartgrid technologies and facilitate the installation of distributed generators in mission critical facilities.

  6. AGS Fast spin resonance jump, magnets and power supplies

    International Nuclear Information System (INIS)

    Glenn, J.W.; Huang, H.; Liaw, C. J.; Marneris, I.; Meng, W.; Mi, J. L.; Rosas, P.; Sandberg, J.; Tuozzolo, J.; Zhang, A.

    2009-01-01

    In order to cross more rapidly the 82 weak spin resonances caused by the horizontal tune and the partial snakes, we plan to jump the horizontal tune 82 times during the acceleration of polarized protons. The current in the magnets creating this tune jump will rise in 100 (micro)s, hold flat for about 4 ms and fan to zero in 100 (micro)s. Laminated beam transport quadrupole magnets have been recycled by installing new two turn coils and longitudinal laminated pole tip shims that reduce inductance and power supply current. The power supply uses a high voltage capacitor discharge to raise the magnet current, which is then switched to a low voltage supply, and then the current is switched back to the high voltage capacitor to zero the current. The current in each of the magnet pulses must match the order of magnitude change in proton momentum during the acceleration cycle. The magnet, power supply and operational experience are described

  7. Prototype tests on the ion source power supplies of the TEXTOR NI-system

    International Nuclear Information System (INIS)

    Goll, O.; Braunsberger, U.; Schwarz, U.

    1987-01-01

    The PINI ion source for the TEXTOR neutral injector is fed by a new modular transistorized power supply. All modules are located in a high voltage cage on 55 kV dc against ground. The normal operation of the injectors includes frequent grid breakdowns causing transient high voltage stresses on the ion source power supplies. These stresses must not disturb the safe operation of the power supplies. The paper describes the set up for extensive testing of a supply prototype module under the expected operating conditions. The main features of this test program are reviewed and the measures taken for a safe operation are discussed. As a result of the investigations, recommendations for the installation of the power supplies at the TEXTOR NI system are given

  8. A capacity expansion planning model for integrated water desalination and power supply chain problem

    International Nuclear Information System (INIS)

    Saif, Y.; Almansoori, A.

    2016-01-01

    Highlights: • Water and power supply chain is considered by a discrete optimization model. • The model examines the capacity expansion and operation of the supply chain problem. • Renewable/alternative power technologies and carbon mitigation are considered. • A case study of Abu Dhabi in UAE is examined as an application of the model. - Abstract: Cogeneration of water and power in integrated cogeneration production plants is a common practice in the Middle East and North Africa (MENA) countries. There are several combinations of water desalination and power technologies which give significant adverse environmental impact. Renewable and alternative energy technologies have been recently proposed as alternative power production paths in the water and power sector. In this study, we examine the optimal capacity expansion of water and power infrastructure over an extended planning horizon. A generic mixed integer linear programming model is developed to assist in the decision making process on: (1) optimal installation of cogeneration expansion capacities; (2) optimal installation of renewable and alternative power plants; (3) optimal operation of the integrated water and power supply chain over large geographical areas. Furthermore, the model considers the installation of carbon capture methods in fossil-based power plants. A case study will be presented to illustrate the mathematical programming application for the Emirate of Abu Dhabi (AD) in the United Arab Emirates (UAE). The case study is solved reflecting different scenarios: base case scenario, integration of renewable and alternative technologies scenario, and CO_2 reduction targets scenario. The results show that increased carbon tax values up to 150 $/ton-CO_2 gives a maximum 3% cost increase for the supply chain net present value. The installation of carbon capture methods is not an economical solution due to its high operation energy requirements in the order of 370 kW h per ton of captured CO_2

  9. Power Supplies for High Energy Particle Accelerators

    Science.gov (United States)

    Dey, Pranab Kumar

    2016-06-01

    The on-going research and the development projects with Large Hadron Collider at CERN, Geneva, Switzerland has generated enormous enthusiasm and interest amongst all to know about the ultimate findings on `God's Particle'. This paper has made an attempt to unfold the power supply requirements and the methodology adopted to provide the stringent demand of such high energy particle accelerators during the initial stages of the search for the ultimate particles. An attempt has also been made to highlight the present status on the requirement of power supplies in some high energy accelerators with a view that, precautionary measures can be drawn during design and development from earlier experience which will be of help for the proposed third generation synchrotron to be installed in India at a huge cost.

  10. Sustainability of water-supply at military installations, Kabul Basin, Afghanistan

    Science.gov (United States)

    Mack, Thomas J.; Chornack, Michael P.; Verstraeten, Ingrid M.; Linkov, Igor

    2014-01-01

    The Kabul Basin, including the city of Kabul, Afghanistan, is host to several military installations of Afghanistan, the United States, and other nations that depend on groundwater resources for water supply. These installations are within or close to the city of Kabul. Groundwater also is the potable supply for the approximately four million residents of Kabul. The sustainability of water resources in the Kabul Basin is a concern to military operations, and Afghan water-resource managers, owing to increased water demands from a growing population and potential mining activities. This study illustrates the use of chemical and isotopic analysis, groundwater flow modeling, and hydrogeologic investigations to assess the sustainability of groundwater resources in the Kabul Basin.Water supplies for military installations in the southern Kabul Basin were found to be subject to sustainability concerns, such as the potential drying of shallow-water supply wells as a result of declining water levels. Model simulations indicate that new withdrawals from deep aquifers may have less of an impact on surrounding community water supply wells than increased withdrawals from near- surface aquifers. Higher rates of recharge in the northern Kabul Basin indicate that military installations in that part of the basin may have fewer issues with long-term water sustainability. Simulations of groundwater withdrawals may be used to evaluate different withdrawal scenarios in an effort to manage water resources in a sustainable manner in the Kabul Basin.

  11. Modeling and simulation of the power demand and supply of a hydrothermal power generating system

    International Nuclear Information System (INIS)

    Pronini, R.A.

    1996-01-01

    Security of supply of electric energy is measured by the capacity to cover the energy demand and power of a supply grid. This coverage is important because the winter peak load period in Switzerland will become problematical in the near future. The objective of this research project is to analyze the ability of a power generating system to satisfy the power requirements of the corresponding supply network. The behaviour of the energy system in critical cases (loss of the largest generator, lack of available power from an external supplier or reduced capacity for energy storage) is tested for the present situation and for the rise in the annual load. The simulation of the load of the supply network is carried out by using a model developed for this project. This model is based on the analysis of half-hourly changes of load and on the statistical maximum values. The power generating system consists of nuclear generating units, hydro units with large reservoirs, run of the river installations and imported energy. Standby units such as gas turbines, spot market and coal-fired power stations are also available. Stochastic and deterministic energy and power models have been developed for the various power stations of the hydrothermal power system. In the case of nuclear power stations, a model has been developed on the basis of the output level, production losses and time and length of outages. The possible feeder streams of the run of the river installations and of the hydro units with a large reservoir are simulated using stochastic methods based on the historical values of the last 35 years. The commitment of the hydro units depends on the peak load requirements. The load and capacity over a period of several days and weeks have been simulated with stochastic models based on the Monte Carlo method and constantly (by half hour intervals) compared. In this manner each month can be simulated. (author) figs., tabs., 46 refs

  12. Reactor units for power supply of remote and inaccessible regions: Selection issue

    Directory of Open Access Journals (Sweden)

    Melnikov N.N.

    2015-06-01

    Full Text Available The paper briefly presents the problem aspects on power supply for the remote and inaccessible regions of Russia. Reactor units of different type and installed electric capacity have been considered in relation to the issue of power supply during mineral deposit development in the Chukotka autonomous region, Yakutia and Irkutsk region. Some preliminary assessment of the possible options for use of small nuclear power plants in various sectors of energy consumption have been carried out based on the analysis of different scenarios for economic development of the regions considered

  13. Magnet power supply as a network object

    International Nuclear Information System (INIS)

    Cohen, S.; Stuewe, R.

    1991-01-01

    Magnet power supplies with embedded microprocessor controls are being installed in the beam-lines of the linear accelerator and proton storage ring at LAMPF. Using an RS422 link they communicate with the accelerator control system through a terminal server connected to the site-wide DECnet backbone. Each supply is, for all intents and purposes, a network object. The controller has a command set of over seventy-five three-character ASCII control and read-back instructions. Strategies for choosing the appropriate control protocol and the process of integrating these devices into a large accelerator control system will be presented. 7 refs., 2 figs., 1 tab

  14. Gas turbine installations in nuclear power plants in Sweden

    International Nuclear Information System (INIS)

    Sevestedt, Lars

    1986-01-01

    At each of the four nuclear power stations in Sweden (Ringhals, Forsmark, Oskarshamn, Barsebaeck) gas turbine generating sets have been installed. These units are normally used for peak load operation dictated of grid and System requirements but they are also connected to supply the electrical auxiliary load of the nuclear plant as reserve power sources. The gas turbines have automatic start capability under certain abnormal conditions (such as reactor trips, low frequency grid etc) but they can also be started manually from several different locations. Starting time is approximately 2- 3 minutes from start up to full load. (author)

  15. Gas turbine installations in nuclear power plants in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Sevestedt, Lars [Electrical Equipment and Gas Turbines, Swedish State Power Board, Ringhals Nuclear Power Plant, S-430 22 Vaeroebacka (Sweden)

    1986-02-15

    At each of the four nuclear power stations in Sweden (Ringhals, Forsmark, Oskarshamn, Barsebaeck) gas turbine generating sets have been installed. These units are normally used for peak load operation dictated of grid and System requirements but they are also connected to supply the electrical auxiliary load of the nuclear plant as reserve power sources. The gas turbines have automatic start capability under certain abnormal conditions (such as reactor trips, low frequency grid etc) but they can also be started manually from several different locations. Starting time is approximately 2- 3 minutes from start up to full load. (author)

  16. DIII-D ICRF high voltage power supply regulator upgrade

    International Nuclear Information System (INIS)

    Cary, W.P.; Burley, B.L.; Grosnickle, W.H.

    1997-11-01

    For reliable operation and component protection, of the 2 MW 30--120 MHz ICRF Amplifier System on DIII-D, it is desirable for the amplifier to respond to high VSWR conditions as rapidly as possible. This requires a rapid change in power which also means a rapid change in the high voltage power supply current demands. An analysis of the power supply's regulator dynamics was needed to verify its expected operation during such conditions. Based on this information it was found that a new regulator with a larger dynamic range and some anticipation capability would be required. This paper will discuss the system requirements, the as-delivered regulator performance, and the improved performance after installation of the new regulator system. It will also be shown how this improvement has made the amplifier perform at higher power levels more reliably

  17. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  18. Risk concept and risk management in the field of power installations

    International Nuclear Information System (INIS)

    Stein, Manfred; Barbulescu, Christiana; Anastasiu, Dan; Ionescu, Dumitru Cezar; Iliescu-Saligny, Paul; Iordache, Vasile

    1996-01-01

    The paper presents several opinions concerning general as well as specific aspects related to the risk management and the use of this concept in the field of power generation. Assessment possibilities of disturbing phenomena are analyzed including severe events leading to failures in power installations. Circumstances of occurring of such events are considered. This paper contains 4 sections. In the introduction the definition of the concept of risk is given. Risk is thus related to both events of a distinct nature with potentially dangerous consequences and events occurring in current operation of installations of different types. The risk notion is as important as other probabilistic indicators characterizing the power installation operation, i.e. availability, reliability, maintenance, etc. The section 2 approaches the concept of risk and argues for the necessity of quantifying it. Two probabilistic indicators are introduced, namely, the occurring probability of a disturbing event and the occurring frequency. To establish an algorithm of risk evaluation the risk notion should be dissociated into two components, the 'intrinsic' or 'initial' risk and the 'associated' risk. In turn, the latter could be divided into two types of risks, namely, the risk of an extant sustaining factor and the risk characterizing the exposure to the effects of the considered events. Applications of these notions for the cases of nuclear accidents, urban electricity or heating breakdown, energy supply breakdown in chemical facilities and others are given. The third section deals with risk management in power sector. Three objectives are here taken into account, i.e., ensuring the safety in operation of adopted systems, ensuring the safety of these systems from the consumers' standpoints and ensuring the environment protection. Examples for using the concepts introduced in case of electrical power stations or energy supply systems are given

  19. An innovational application of digital power supply controller on SSRF dynamic power supply

    International Nuclear Information System (INIS)

    Chen Huanguang; Li Rui; Guo Chunlong; Shen Tianjian; Li Deming

    2008-01-01

    Control structure of dynamic power supply using PSI controller in SLS and Diamond is introduced. For designing dynamic power supply using PSI controller in the booster of SSRF, an innovative application of PSI digital power supply controller has been developed. In the commissioning of SSRF, the dynamic power supplies performed perfectly. (authors)

  20. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  1. The ITER poloidal field system: control and power supplies

    International Nuclear Information System (INIS)

    Mondino, P.L.; Benfatto, I.; Gribov, Y.; Matsukawa, M.; Odajima, K.; Portone, A.; Roshal, A.; Bareyt, B.; Bertolini, E.; Bottereau, J.M.; Huart, M.; Maschio, A.; Bulgakov, S.; Kuchinski, V.

    1995-01-01

    The paper reports the preliminary scenario of the ITER Poloidal Field (PF) system operation, the method used to evaluate the installed power, the basic structure of the circuits and finally the concepts of the preliminary design of control and power supply. The superconducting coils are energized from the HV Grid with conventional AC/DC converters. R and D is required for circuit breakers, make switches and resistors, the basic components of both the switching networks and the discharge circuits. (orig.)

  2. First operation experiences from a 30 kV 104 MVA HTS power cable installed in a utility substation

    DEFF Research Database (Denmark)

    Willen, D.; Hansen, F.; Daumling, M.

    2002-01-01

    realistic conditions in the substation of Amager (AMK). Approximately 50 000 private and business customers are supplied from this cable. The load can be adjusted from 20% to 100% of the power supplied and the number of branches connected can be altered. This and other early HTS power installations...... are expected to act as ice-breakers for the HTS technology...

  3. Energy efficiency criteria in uninterruptible power supply selection

    International Nuclear Information System (INIS)

    Moreno-Munoz, A.; Rosa, Juan Jose Gonzalez de la; Flores-Arias, J.M.; Bellido-Outerino, F.J.; Gil-de-Castro, A.

    2011-01-01

    With the generalized use of microelectronic devices, server computers and other susceptible equipment, the subject related to power quality (PQ) and its relationship to vulnerability of high performance plants are becoming an increasing concern to the industry. This paper addresses how uninterruptible power supply (UPS), particularly when configured in distributed DC mode, can become an energy efficient (EE) solution in high-tech buildings, especially when integrated with complimentary PQ measures. The paper is based on PQ audits conducted at different high-tech industries over the last years. It was found that the main problems for the equipment installed were voltage sags (or dips). Among all categories of electrical disturbances, voltage sags and momentary interruptions are the nemeses of the automated industrial process. The paper analyzes the capabilities of modern electronic power supplies and the convenience of embedded solution. Finally it is addresses the role of the Standards on the protection of electronic equipment and the implications for the final costumer.

  4. Power supply system for COMPASS tokamak re-installed at the IPP, Prague

    Czech Academy of Sciences Publication Activity Database

    Zajac, Jaromír; Pánek, Radomír; Žáček, František; Vlček, Jiří; Hron, Martin; Křivská, Alena; Hauptmann, R.; Daněk, M.; Šimek, J.; Prosek, J.

    2009-01-01

    Roč. 84, 7-11 (2009), s. 2020-2024 ISSN 0920-3796. [Symposium on Fusion Technology /25th./. Rostock, 15.09.2008-19.09.2008] Institutional research plan: CEZ:AV0Z20430508 Keywords : Compass * Power supply system * Flywheel-generator * Plasma start-up Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 1.122, year: 2009 http://dx.doi.org/10.1016/j.fusengdes.2008.11.092

  5. Adaptation of fast responding power supply for radial position control in SST-1

    International Nuclear Information System (INIS)

    Sharma, Dinesh Kumar; Patel, Kiritkumar B.; Singh, Akhilesh Kumar; Dhongde, Jasraj

    2013-01-01

    A high current, fast responding power supply was installed in 2005 for vertical stabilization of elongated plasmas in SST-1 tokamak. Presently, during initial experiments of SST-1 tokamak the need for radial control during current build-up was envisaged. For this purpose the existing power supply was suitable and the same was re-commissioned and control adaptations were carried as per experimental requirements. This paper highlights the capabilities of the power supply and details the modifications in the control interfaces and test programs for the radial control purpose. Details of the operation of the power supply along with control interfaces with performance measurements are provided. The re-commissioning provided an opportunity in the trouble shooting methods and sequential operation of the system. With the operational use on the actual coil the mutual effects are understood better and appropriate test programs are prepared. The power supply provided satisfactory performance for the intended use. In additional the system is suitable to simulate a plasma current loop to enable the testing and calibration of Rogowski coil used for plasma current measurement. (author)

  6. Turn-key supply for the power supplies of the control coils of wendelstein 7-X experiment

    International Nuclear Information System (INIS)

    Jauregi, E.; Ganuza, D.; Garcia, I.; Rio, J.M. del; Rummel, T.; Fuellenbach, F.

    2003-01-01

    In the Max-Planck Institute for Plasma Physics, IPP, in Greifswald, a new stellerator is being built for fusion research experiments, the so called Wendelstein 7-X Experiment. JEMA Company has designed, manufacture and supply the turnkey system which energises the ten control coils in the stellerator. The system comprises ten independent Switch-mode power supplies, and the central distribution stations for power, cooling and control facilities. Each power supply must provide a controlled current compounded of direct current and 0-20 Hz bandwidth ac current in a range of almost 3 kA at low voltage, 30 V, in four quadrants. Positive and negative voltage and sinusoidal current with low harmonic distortion is required by load. The selected design is based on Switch-mode-power supply technology (SMPS) providing the system with a very high regulation response (very low current and voltage ripple) and excellent input power factor, keeping the grid total harmonic distortion (THD) under minimum values. The sources can be operated locally as independent systems or they can be co-ordinated from a main control keeping current synchronisation requirements. The system in its entirety requires a high efficiency due to thermal considerations and reduced space. The system presented here introduces a decisive solution for the future power supplies to superconducting or regular coils, where the regulation, precision and ripple are the basic requirements for the design. During year 2000 the design stage was covered and in 2001 a first prototype for the power supplies was manufactured and successfully tested at factory. The entire system has been installed over this year after the series fabrication and it is currently working at IPP facilities, waiting for the acceptance tests scheduled before end of the year. This paper aims to explain the different stages the company went through in order to get validation of the power supply system and make it running at its last location

  7. Nuclear fusion power supply device

    International Nuclear Information System (INIS)

    Nakagawa, Satoshi.

    1975-01-01

    Object: To use a hybrid power supply device, which comprises a thyristor power supply and a diode power supply, to decrease cost of a nuclear fusion power supply device. Structure: The device comprises a thyristor power supply connected through a closing unit and a diode power supply connected in parallel through a breaker, input of each power supply being applied with an output voltage of a flywheel AC generator. When a current transformer is excited, a disconnecting switch is turned on to close the diode power supply and a current of the current transformer is increased by an automatic voltage regulator to a set value within a predetermined period of time. Next, the current is cut off by a breaker, and when the breaker is in on position, the disconnecting switch is opened to turn on the closing unit. Thus, when a plasma electric current reaches a predetermined value, the breaker is turned on, and the current of the current transformer is controlled by the thyristor power supply. (Kamimura, M.)

  8. D. C. power supply

    Energy Technology Data Exchange (ETDEWEB)

    Ohashi, N. Watanabe, Y.; Kitani, M

    1978-04-01

    DC power supplies are for ordinary and emergency use as power sources for various structures such as office buildings, department stores, hotels, and for facilities such as roads, tunnels, dams, power stations, etc. There is strong demand for these dc power supplies to be safe, automated, and maintenance free, and to have high reliability. A dc power supply which meets these demands is described; electric circuit construction is emphasized. (10 figures, 4 tables)

  9. Smart Power Supply for Battery-Powered Systems

    Science.gov (United States)

    Krasowski, Michael J.; Greer, Lawrence; Prokop, Norman F.; Flatico, Joseph M.

    2010-01-01

    A power supply for battery-powered systems has been designed with an embedded controller that is capable of monitoring and maintaining batteries, charging hardware, while maintaining output power. The power supply is primarily designed for rovers and other remote science and engineering vehicles, but it can be used in any battery alone, or battery and charging source applications. The supply can function autonomously, or can be connected to a host processor through a serial communications link. It can be programmed a priori or on the fly to return current and voltage readings to a host. It has two output power busses: a constant 24-V direct current nominal bus, and a programmable bus for output from approximately 24 up to approximately 50 V. The programmable bus voltage level, and its output power limit, can be changed on the fly as well. The power supply also offers options to reduce the programmable bus to 24 V when the set power limit is reached, limiting output power in the case of a system fault detected in the system. The smart power supply is based on an embedded 8051-type single-chip microcontroller. This choice was made in that a credible progression to flight (radiation hard, high reliability) can be assumed as many 8051 processors or gate arrays capable of accepting 8051-type core presently exist and will continue to do so for some time. To solve the problem of centralized control, this innovation moves an embedded microcontroller to the power supply and assigns it the task of overseeing the operation and charging of the power supply assets. This embedded processor is connected to the application central processor via a serial data link such that the central processor can request updates of various parameters within the supply, such as battery current, bus voltage, remaining power in battery estimations, etc. This supply has a direct connection to the battery bus for common (quiescent) power application. Because components from multiple vendors may have

  10. Laser power supply

    International Nuclear Information System (INIS)

    Bernstein, D.

    1975-01-01

    The laser power supply includes a regulator which has a high voltage control loop based on a linear approximation of a laser tube negative resistance characteristic. The regulator has independent control loops for laser current and power supply high voltage

  11. Status of magnet power supply development for the APS storage ring

    International Nuclear Information System (INIS)

    McGhee, D.

    1989-01-01

    To simplify installation and speed testing of the Advanced Photon Source (APS) storage ring magnets, vacuum chambers and magnet power supplies, a modular approach was developed. All but the dipole magnets are independently controlled. Pulse width modulated dc-to-dc converters are used to power the individual magnets, with 12-pulse power supplies providing the raw dc to the converters. A magnet support base is the heart of a module and may hold as many as 7 magnets with 8 individually powered coils. The dc-to-dc converters are part of each magnet base module. This paper will show the modular approach which is used for the storage ring magnet systems and will give the test results of the prototype topology for the cd-to-cd converters that are being built and tested to power 680 quadrupole and sextupole magnets. 4 refs., 11 figs., 1 tab

  12. Wireless power transfer electric vehicle supply equipment installation and validation tool

    Science.gov (United States)

    Jones, Perry T.; Miller, John M.

    2015-05-19

    A transmit pad inspection device includes a magnetic coupling device, which includes an inductive circuit that is configured to magnetically couple to a primary circuit of a charging device in a transmit pad through an alternating current (AC) magnetic field. The inductive circuit functions as a secondary circuit for a set of magnetically coupled coils. The magnetic coupling device further includes a rectification circuit, and includes a controllable load bank or is configured to be connected to an external controllable load back. The transmit pad inspection device is configured to determine the efficiency of power transfer under various coupling conditions. In addition, the transmit pad inspection device can be configured to measure residual magnetic field and the frequency of the input current, and to determine whether the charging device has been installed properly.

  13. AC power supply systems

    International Nuclear Information System (INIS)

    Law, H.

    1987-01-01

    An ac power supply system includes a rectifier fed by a normal ac supply, and an inverter connected to the rectifier by a dc link, the inverter being effective to invert the dc output of the receiver at a required frequency to provide an ac output. A dc backup power supply of lower voltage than the normal dc output of the rectifier is connected across the dc link such that the ac output of the rectifier is derived from the backup supply if the voltage of the output of the inverter falls below that of the backup supply. The dc backup power may be derived from a backup ac supply. Use in pumping coolant in nuclear reactor is envisaged. (author)

  14. Contrasting electricity demand with wind power supply: case study in Hungary

    International Nuclear Information System (INIS)

    Kiss, P.; Janosi, I. M.; Varga, L.

    2009-01-01

    We compare the demand of a large electricity consumer with supply given by wind farms installed at two distant geographic locations. Obviously such situation is rather unrealistic, however our main goal is a quantitative characterization of the intermittency of wind electricity. The consumption pattern consists of marked daily and weekly cycles interrupted by periods of holidays. In contrast, wind electricity production has neither short-time nor seasonal periodicities. We show that wind power integration over a restricted area cannot provide a stable base load supply, independently of the excess capacity. Further essential result is that the statistics are almost identical for a weekly periodic pattern of consumption and a constant load of the same average value. The length of both adequate supply and shortfall intervals exhibits a scale-free (power-law) frequency distribution, possible consequences are shortly discussed. (author)

  15. Contrasting Electricity Demand with Wind Power Supply: Case Study in Hungary

    Directory of Open Access Journals (Sweden)

    Imre M. Jánosi

    2009-09-01

    Full Text Available We compare the demand of a large electricity consumer with supply given by wind farms installed at two distant geographic locations. Obviously such situation is rather unrealistic, however our main goal is a quantitative characterization of the intermittency of wind electricity. The consumption pattern consists of marked daily and weekly cycles interrupted by periods of holidays. In contrast, wind electricity production has neither short-time nor seasonal periodicities. We show that wind power integration over a restricted area cannot provide a stable baseload supply, independently of the excess capacity. Further essential result is that the statistics are almost identical for a weekly periodic pattern of consumption and a constant load of the same average value. The length of both adequate supply and shortfall intervals exhibits a scale-free (power-law frequency distribution, possible consequences are shortly discussed.

  16. Experimental coal dust suppression system installed at the Nikola Tesla thermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Guzijan, D [Rudarski Institut, Belgrade (Yugoslavia). Zavod za Ventilaciju i Tehnicku Zastitu

    1988-01-01

    Describes a project conducted at the Nikola Tesla thermal power plant by the Mining Institute of Belgrade to reduce the high levels of dust concentrations in overloading stations on coal conveyors and hoppers. A mathematical model was developed to determine the ventilation capacity required at each of the 18 overloading stations with the hoppers considered successively: empty, 1/3 full, 2/3 full and completely full. Shows how this model enabled an efficient dust suppression system to be developed and subsequently installed by the Termovent company in Belgrade using 4 axial ventilators supplied by the Ventilator Company in Zagreb. The ventilators were powered by means of 5.5 kW electric motors and provided 440 Pa pressure at 950 rpm. Gives the result of dust concentration measurements indicating that the installed system achieved the results predicted by the mathematical model and that the levels were well below the statutory limit. A description of the complete installation is included. 3 refs.

  17. Institutional support to the nuclear power based on transportable installations

    International Nuclear Information System (INIS)

    Kuznetsov, V.P.; Cherepnin, Y.S.

    2010-01-01

    Existing nuclear power uses large-power nuclear plants (more than 1,000 MWe) and enriched uranium fuel ( 2 35 U ). Each plant is treated as an exclusive costly project. As a result, large NPPs are operated predominantly in highly developed big countries. In many countries, construction of large power units is not reasonable because of the economic conditions and national specifics. This calls for the use of small- and medium-power nuclear plants (SMPNP), especially transportable nuclear installations (TNI). TNI feature small power (up to 100 MWe); serial production, and transportability. Small- and medium-power nuclear plants could serve to produce electricity and heat; perform water desalination; provide temporary and emergency energy supply. The authors discuss some findings of the studies carried out on the various aspects of the TNI life, as well as the legal and institutional support to their development, construction and operation. The studies have been performed in the framework of the INPRO Action Plan

  18. Evaluation Of RSG-GAS Power Installed After 12 Years

    International Nuclear Information System (INIS)

    Mrsahala, Yan Bony

    2001-01-01

    The total power installed in RSG-GAS electric system less then 3 x 2500 KVA. Some of powers installed included are the never used loads, so the operationally total load installed that regularly operational and incidental are amount about 3700 KVA. In this condition, the capacity of power transformer installed 3 x 2500 KVA becomes larger. The influences of the numinous power are electric bill payment by RSG-GAS. The reduces power installed may be done as well as remember that some of the load not be operation so that the power consume for that facility could be cut off. The evaluation and calculation result gives some alternatively can be selected to minimize the electric bill payment

  19. Power supply for the Spanish Stellarator TJ-II

    International Nuclear Information System (INIS)

    Almoguera, L. de; Blaumoser, M.; Mendez, P.; Kirpitchev, I.

    1995-01-01

    TJ-II is a flexible, medium size, heliac under construction at the EURATOM-CIEMAT Association in Madrid, Spain. Its main data are: major plasma radius: 1,5 m; minor plasma dimension: 0,2 m by 0,4 m; toroidal magnetic field: 1 T; rotational transform: 0,9 to 2,5; shear: -1% to 10 %; magnetic well: 0 to 6 %. This device requires an entirely new electrical system to power its magnetic field coils and the plasma heating systems. As the local grid is not powerful enough, a pulse power system will be installed which consists of a DC-pony motor, a synchronous generator and seven 12-pulse controlled thyristor rectifiers. A contract has been placed with JEMA, San Sebastian, Spain, as the general contractor which provides the entire power supply system as a turn-key package. (orig.)

  20. Final Test of the W7-X Control Coils Power Supply and its Integration into the Overall Control Environment

    International Nuclear Information System (INIS)

    Fuellenbach, F.; Rummel, T.; Pingel, S.; Laqua, H.; Mueller, I.; Jauregi, E.

    2006-01-01

    In order to be able to vary the magnetic configuration of WENDELSTEIN 7-X (W7-X) at the plasma edge and allow sweeping of the power across the divertor target plates 10 '' control coils '' are installed inside the plasma vessel behind the baffle plates of the divertor. The coils are made of a hollow copper profile with eight turns each. The dimensions of the coils are 2,05 m x 0,35 m x 0,35 m with a three dimensional shape to fit into the narrow space between the baffles and the wall of the plasma vessel. Each of the ten coils is supplied by independent power supplies each providing bi-directionally a direct current of 2500 A with high accuracy and low ripple. To allow sweeping the power deposition from the plasma across the target plates the power supplies provide an alternating current of up to 625 A with frequencies up to 20 Hz which is synchronised between the ten supplies in order to maintain the symmetry of the magnetic field. The total output current of a power supply is a superposition of a direct current and an alternating current, where both parts have to be independently adjustable. JEMA, Spain provided the complete set of power supplies which are based on 10 independent four-quadrant power supplies with a link rectifier and includes a cooling water unit, a dedicated distribution and a central control and visualization system. All ten power supply units and auxiliary systems have meanwhile been installed and finally tested at the W7-X site in Greifswald. The paper focuses on the results of the final tests and measures to integrate the power supply system to the overall control system including the central PLC and PC's for experiment control, data acquisition- and security systems. (author)

  1. Magnet power supply for ISABELLE

    International Nuclear Information System (INIS)

    Nawrocky, R.J.; Frankel, R.F.; Thomas, M.G.

    1979-01-01

    The power supply system which will energize the superconducting magnets in the ISABELLE machine consists of some 520 computer-programmable power supplies with outputs ranging from 50 A to 4500 A. Most of the power supplies will be used for the correction of field harmonics, orbit correction and adjustment of the machine working line. During acceleration, currents in various magnet correction coils will be controlled in real time to track the main field; all power supplies must be highly stable during the stacking and storage of the beam (in some cases current regulation must be in the order of 0.001%). PS reference programs will be stored in microprocessor based function generators embedded in each power supply. Due to the large amount of stored energy in the system, the magnets must be protected during quenches. Details of the power supply and of the magnet quench protection system are described

  2. Installation design of pump motor control systems for supplied of the RSG-GAS secondary raw water cooling system

    International Nuclear Information System (INIS)

    Kiswanto; Teguh Sulistyo; M-Taufik

    2013-01-01

    It has designed already of an installation of the pump motor control system for supplied of raw water to fulfil the RSG-GAS secondary cooling system. The installation design of this plant is used to supply electrical energy from PLN and 3 phase generator to operate the pump motor embedded multilevel type, capacity, Q = 30 m 3 /h; electric power, PN = 4 kW; voltage, 380V/3-/50Hz, and Y connections that can be operated manually or automatically by using the automatic transfer switch. The results obtained recapitulation total load of 4 kW, the magnitude of the nominal current of 9.5 A; kind of safety and capacity are used NFB 16 A, use of this type of cable to the control panel is PLN NYY 6 mm 2 diameter maximum current capacity of 25 A cable and use the control panel to the pump motor cable type NYY 4 mm 2 diameter maximum current capacity of 20 A. The design of the pump motor control system installation is ready to be implemented. (author)

  3. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  4. Field Trial on a Rack-mounted DC Power Supply System with 80-Ah Lithium-ion Batteries

    Science.gov (United States)

    Matsushima, Toshio

    Using an industrial lithium-ion battery that has higher energy density than conventional valve-regulated lead-acid batteries, a rack-mounted DC-power-supply system was assembled and tested at a base transceiver station (BTS) offering actual services. A nominal output voltage and maximum output current of the system is 53.5V and 20A, respectively. An 80-Ah lithium-ion battery composed of 13 cells connected in series was applied in the system and maintained in a floating charge method. The DC-power-supply system was installed in a 19-inch power rack in the telecommunications equipment box at BTS. The characteristics of the 80Ah lithium-ion battery, specifications of the DC-power-supply system and field-test results were shown in this paper.

  5. Tuning magnet power supply

    International Nuclear Information System (INIS)

    Han, B.M.; Karady, G.G.; Thiessen, H.A.

    1989-01-01

    The particles in a Rapid Cycling Accelerator are accelerated by rf cavities, which are tuned by dc biased ferrite cores. The tuning is achieved by the regulation of bias current, which is produced by a power supply. The tuning magnet power supply utilizes a bridge circuit, supplied by a three phase rectifier. During the rise of the current, when the particles are accelerated, the current is controlled with precision by the bridge which operates a power amplifier. During the fall of the current, the bridge operates in a switching mode and recovers the energy stored in the ferrites. The recovered energy is stored in a capacitor bank. The bridge circuit is built with 150 power transistors. The drive, protection and control circuit were designed and built from commercial component. The system will be used for a rf cavity experiment in Los Alamos and will serve as a prototype tuning power supply for future accelerators. 1 ref., 7 figs

  6. Analysis of Energy and Power Generation in a Photovoltaic Micro installation Interconnected with a Low Voltage Grid

    Directory of Open Access Journals (Sweden)

    Marian Sobierajski

    2015-12-01

    Full Text Available The paper discusses the performance of the 15 kW photovoltaic micro installation located on the roof of building D-1 of the Faculty of Electrical Engineering at Wroclaw University of Technology. The micro installation is connected to the low voltage grid, which supplies the new, air-conditioned building D-20. The paper discusses the energy and power generation output in yearly, monthly, and daily intervals. The micro installation’s output in the summer morning peaks is compared with the daily wind generation against the background of the demand, generation, regulation reserve, and overhauls in the National Power System.

  7. PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as designed. The proper installation of the PUREX SAMCONS Trailer UPS components and wiring will be systematically evaluated by performance of this procedure. Proper operation of the SAMCONS computer UPS will be verified by performance of a timed functional load test, and verification of associated alarms and trouble indications. This test procedure will be performed in the SAMCONS Trailer and will include verification of receipt of alarms at the SAMCONS computer stations. This test may be performed at any time after the completion of HNF-SD-CP-ATP-083, PUREX Surveillance and Monitoring and Control System (SAMCONS) Acceptance Test Procedure, when computer display and alarm functions have been proven to operate correctly

  8. Design and preliminary test results of the 40 MW power supply at the National High Magnetic Field Laboratory

    International Nuclear Information System (INIS)

    Boenig, H.J.; Bogdan, F.; Morris, G.C.; Ferner, J.A.; Schneider-Muntau, H.J.; Rumrill, R.H.; Rumrill, R.S.

    1993-01-01

    Four highly stabilized, steady-state, 10 MW power supplies have been installed at the National High Magnetic Field Laboratory in Tallahassee, FL. Each supply consists of a 12.5 kV vacuum circuit breaker, two three-winding, step-down transformers, a 24-pulse rectifier with interphase reactors and freewheeling diodes, and a passive and an active filter. Two different transformer tap settings allow dc supply output voltages of 400 and 500 V. The rated current of a supply is 17 kA and each supply has a one hour overload capability of 20 kA. The power supply output bus system, including a reversing switch at the input and 2 x 16 disconnect switches at the output, connects each supply to 16 different magnet cells. The design of the power supply is described and preliminary test results with a supply feeding a 10 MW resistive load are presented

  9. International experiences with power supply crises

    International Nuclear Information System (INIS)

    2002-01-01

    Many so-called deregulated power markets experience a hardened energy and power balance and some have had supply crises. This report discusses the crises, their impacts and their causes as well as the measures taken by the authorities to solve the crises. It also considers the similarities or dissimilarities with respect to the situation in Norway the winter 2002/2003. Like Norway, many of the countries have a considerable share of hydroelectric power. It is found, however, that the dependence on water of its own is not the reason for the crises, but that the inflow conditions give the market greater challenges. Furthermore, the Norwegian market has greater flexibility in the consumption, greater import capacity, better price security possibilities and less problems with market power than most of the countries here considered. Various factors influence a country's power consumption and production capacity. Economic growth and the availability of inexpensive power contribute to accelerate the consumption, while predictable external conditions and sufficient expected investment earnings are necessary to achieve an increase of the capacity - both through new investments and attendance to existing capacity. In a smooth power market there must be a certain correspondence between consumption and installed capacity, and the capacity must be such that it can cover the continuous demand for power and at the same time be flexible enough to deliver power at peak loads. This is also true of the transmission capacity. In addition, some extra capacity must be available for unexpected events. The basic problem is, in any power market, that the consumption may rise fast, while the investments in new capacity typically occurs in leaps, with long and costly construction phases. Many countries have lately experienced a hardening of the balance between consumption and capacity and so have been vulnerable to unexpected increases in consumption or resource failure. This was also the

  10. Analysis of the Potential for Use of Floating PV Power Plant on the Skadar Lake for Electricity Supply of Aluminium Plant in Montenegro

    OpenAIRE

    Vladan Durković; Željko Đurišić

    2017-01-01

    This paper deals with a conceptual solution for the supply of a part of electrical energy for the needs of Aluminium Plant Podgorica (KAP) in Montenegro from a large Floating Photovoltaic Power Plant (FPPP), that would be installed on the nearby lake. The recommended FPPP, with an innovative azimuth angle control method and total installed power of 90 MWp, would consist of 18 power plants having an installed power of 5 MWp each. An analysis using the NREL solar insolation database ascertained...

  11. DC power supplies power management and surge protection for power electronic systems

    CERN Document Server

    Kularatna, Nihal

    2011-01-01

    Modern electronic systems, particularly portable consumer electronic systems and processor based systems, are power hungry, compact, and feature packed. This book presents the most essential summaries of the theory behind DC-DC converter topologies of both linear and switching types. The text discusses power supply characteristics and design specifications based on new developments in power management techniques and modern semiconductors entering into the portable electronics market. The author also addresses off-the-line power supplies, digital control of power supply, power supply protection

  12. Development of power supplies at VECC

    International Nuclear Information System (INIS)

    De, T.K.

    2005-01-01

    Large scale indigenous production of power supplies started at VECC since 1970. At a later stage, compact Superconducting Cyclotron demanded highly stable (of the order of 20 ppm) magnet power supplies to accommodate a large number of highly precise distributed beam trajectory in a smaller radial distance. Intensive quality development around the power supplies became essential. In-depth understanding of the power supply components, modules, computer based simulation, design, instrumentation, wide and long experience, all put together have contributed remarkable results leading to high quality indigenous development of power supply at VECC - a brief report has been presented in this paper. (author)

  13. Reduksi Harmonisa Pada Uninterruptible Power Supply (UPS) Dengan Single Tuned Passive Filter

    OpenAIRE

    Nasution, Agus Almi

    2017-01-01

    Using non-linier load in Uninterruptible Power Supply (UPS) can cause harmonic distortion which will eventually have the effect on power quality. The research was designed as a single-turned passive filter to cope will harmonic distortion in UPS. In this phase, THDv, THDi, and IHDi were measured in UPS. MATLAB/Simulink was used for simulation of filter testing. After single-turned passive filter was installed, the third order of harmonic current decreased from 47,69% to 7,08% or reduced 40.61...

  14. Reactive power supply by distributed generators

    OpenAIRE

    Braun, M.

    2008-01-01

    Distributed reactive power supply is necessary in distribution networks for an optimized network operation. This paper presents first the reactive power supply capabilities of generators connected to the distribution network (distributed generators). In a second step an approach is proposed of determining the energy losses resulting from reactive power supply by distributed generators. The costs for compensating these losses represent the operational costs of reactive power supply. These cost...

  15. DISTURBANCES IN THE POWER SUPPLY NETWORK OF BUCHAREST SUBWAY SYSTEM (PART 1

    Directory of Open Access Journals (Sweden)

    Alexandru Ionuț CHIUȚĂ

    2011-05-01

    Full Text Available In the present study it is exposed the problem of disturbances in the main power supply of Bucharest Subway (underground system, the cause and their action, as well as the measures taken to limit the disturbances produced. All this is reflected in the measurements made using oscilloscope Fluke installed at the dispatch point, following to be then processed.

  16. Analysis on the Electric Power Supply - Demand Measures of Japan in 2011 Summer after Earthquake and Tsunami

    International Nuclear Information System (INIS)

    Lee, Y. E.; Chang, H. S.

    2011-01-01

    Only 12 of 54 nuclear reactors are in operation as of September 1, 2011 in the wake of the earthquake and tsunami in Japan. The share of nuclear power in the nation's installation capacity fell to about 14% in August from about 30% before March 11, 2011. Government or many of research institutes estimated that the power supply system in Japan would fall to the minus reserve margin, if the nuclear power stations could not be restarted as scheduled. However, the current situation of power supply system in Japan is less severe than expected before, because the power companies and public have engaged in various diligent efforts to boost supply capacity or reduce demand in response to the electric power crisis. This paper aims to analyze the how much Japan electric power supply system depends on the nuclear power, what kinds of countermeasures of electric power supply-demand are taken by electricity companies in summer time to avoid the blackouts and why the saving electricity in Japan could be possible unlike Korea. Insights from this paper would be taken into account in the long term energy planning, even though the further study in depth should be followed

  17. Power supply design for Hadron Facility

    International Nuclear Information System (INIS)

    Karady, G.; Kansog, J.; Thiessen, H.A.; Schneider, E.

    1987-01-01

    Recently, a study investigated the feasibility of building a large 60 GeV, kaon factory accelerator. This paper presents the conceptual design of the magnet power supplies and energy storage system. In this study the following three systems were investigated: (a) power supply using storage generator; (b) power supply using inductive storage device; and (c) resonant power supplies. These systems were analyzed from both technical and economical points of view. It was found that all three systems are feasible and can be built using commercially available components. From a technical point of view, the system using inductive storage is the most advantageous. The resonant power supply is the most economical solution

  18. 600W uninterruptible power supply

    Energy Technology Data Exchange (ETDEWEB)

    Frizell, C

    1988-01-01

    Although the mains power supply in western Europe is normally reliable, power failures, transients and noise can cause loss or corruption of data held on personal computers. The design of an uninterruptible power supply system (UPS) based on well proven technology, is described.

  19. Wind-driven SEIG supplying DC microgrid through a single-stage power converter

    Directory of Open Access Journals (Sweden)

    Vellapatchi Nayanar

    2016-09-01

    Full Text Available Nowadays, there is an increased emphasis on utilizing the renewable energy sources and selection of suitable power converters for supplying dc microgrid. Among the various renewable energy sources, wind energy stands first in terms of installed capacity. So, an attempt is made in this paper for supplying dc microgrid utilizing wind energy. A self-excited induction generator has been used in the proposed wind energy conversion system (WECS. A single-stage power converter, namely, semi-converter is connected between the SEIG and dc grid terminals for closed-loop control of the proposed system. A perturb and observe (P&O based maximum power point tracking (MPPT algorithm has been developed and implemented using a dsPIC30F4011 digital controller. In this MPPT algorithm, the firing angle of the converter is adjusted by continuously monitoring the dc grid current for a given wind velocity. For analyzing the proposed system, a MATLAB/Simulink model has been developed by selecting the various components starting from wind-turbine model to the power converter supplying dc microgrid. Successful working of the proposed WECS has also been shown through experimental results obtained on a prototype model developed in the laboratory.

  20. ESB-Based Sensor Web Integration for the Prediction of Electric Power Supply System Vulnerability

    Directory of Open Access Journals (Sweden)

    Milos Bogdanovic

    2013-08-01

    Full Text Available Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application.

  1. ESB-based Sensor Web integration for the prediction of electric power supply system vulnerability.

    Science.gov (United States)

    Stoimenov, Leonid; Bogdanovic, Milos; Bogdanovic-Dinic, Sanja

    2013-08-15

    Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB)-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application.

  2. ESB-Based Sensor Web Integration for the Prediction of Electric Power Supply System Vulnerability

    Science.gov (United States)

    Stoimenov, Leonid; Bogdanovic, Milos; Bogdanovic-Dinic, Sanja

    2013-01-01

    Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB)-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application. PMID:23955435

  3. Electrical installations of the Channel tunnel; Installations electriques du Tunnel sous la Manche

    Energy Technology Data Exchange (ETDEWEB)

    Kersabiec, G. de [Eurotunnel, Folkestone (United Kingdom)

    2002-08-01

    Like an underground factory, the railway and auxiliary equipments of the Channel tunnel between France and UK, need a reliable and redundant power supply with a high quality maintenance. This article presents: the design criteria of the power distribution systems, the installation itself and the organisation of its exploitation: 1 - transportation system of the Channel tunnel (loads to supply, exploitation imperatives, fundamental criteria); 2 - external power sources (connection to the UK and French grids, values used by the national grids); 3 - exploitation criteria, tunnel design; 4 - description (main UK and French power stations, 25 kV traction network, 21 kV distribution network, tunnels, lighting in railway tunnels, supply of terminals, earthing network); 5 - exploitation; 6 - maintenance and quality. (J.S.)

  4. TEXT poloidal coil systems power supplies

    International Nuclear Information System (INIS)

    Hutchins, S.H.; Brower, D.F.

    1977-01-01

    TEXT is a convertional iron core tokamak which will have a toroidal field of 3.0 Tesla produced by room temperature copper coils and a maximum plasma current pulse of 400 kA induced by a 40 turn Ohmic Heating coil. The major radius is 100 cm and the minor radius of the plasma is 28 cm. The machine is intended for basic research in tokamak plasma physics and atomic physics and is designed primarily to provide a stable hot plasma, extremely good diagnostic access, and reliable operation. The discharge pulse length will be 300 msec and the repetition period 120 seconds. Power for the toroidal field coils and for the ohmic heating supply is provided by a 100 MVA energy storage alternator. The vertical field, horizontal field, fast positioning, and discharge cleaning power supply systems are powered from the Tokamak Laboratory power mains. The ohmic heating power system consists of an SCR controlled premagnetizing supply and commutation circuit, the main ohmic heating capacitor bank to provide plasma breakdown and current rise, and an SCR controlled power supply which sustains plasma current during the 300 ms pulse. The vertical field power system uses a small capacitor bank and an SCR controlled supply. The horizontal field has a reversible SCR controlled supply, and the fast positioning coils are powered by bipolar output transistor controlled supplies. This paper describes the loads, required wave forms, and the specifications for these power supply systems

  5. Practical switching power supply design

    CERN Document Server

    Brown, Martin C

    1990-01-01

    Take the ""black magic"" out of switching power supplies with Practical Switching Power Supply Design! This is a comprehensive ""hands-on"" guide to the theory behind, and design of, PWM and resonant switching supplies. You'll find information on switching supply operation and selecting an appropriate topology for your application. There's extensive coverage of buck, boost, flyback, push-pull, half bridge, and full bridge regulator circuits. Special attention is given to semiconductors used in switching supplies. RFI/EMI reduction, grounding, testing, and safety standards are also deta

  6. Practical application of the benchmarking technique to increase reliability and efficiency of power installations and main heat-mechanic equipment of thermal power plants

    Science.gov (United States)

    Rimov, A. A.; Chukanova, T. I.; Trofimov, Yu. V.

    2016-12-01

    Data on the comparative analysis variants of the quality of power installations (benchmarking) applied in the power industry is systematized. It is shown that the most efficient variant of implementation of the benchmarking technique is the analysis of statistical distributions of the indicators in the composed homogenous group of the uniform power installations. The benchmarking technique aimed at revealing the available reserves on improvement of the reliability and heat efficiency indicators of the power installations of the thermal power plants is developed in the furtherance of this approach. The technique provides a possibility of reliable comparison of the quality of the power installations in their homogenous group limited by the number and adoption of the adequate decision on improving some or other technical characteristics of this power installation. The technique provides structuring of the list of the comparison indicators and internal factors affecting them represented according to the requirements of the sectoral standards and taking into account the price formation characteristics in the Russian power industry. The mentioned structuring ensures traceability of the reasons of deviation of the internal influencing factors from the specified values. The starting point for further detail analysis of the delay of the certain power installation indicators from the best practice expressed in the specific money equivalent is positioning of this power installation on distribution of the key indicator being a convolution of the comparison indicators. The distribution of the key indicator is simulated by the Monte-Carlo method after receiving the actual distributions of the comparison indicators: specific lost profit due to the short supply of electric energy and short delivery of power, specific cost of losses due to the nonoptimal expenditures for repairs, and specific cost of excess fuel equivalent consumption. The quality loss indicators are developed

  7. Energy discharge heater power supply

    International Nuclear Information System (INIS)

    Jaskierny, W.

    1992-11-01

    The heater power supply is intended to supply capacitively stored,energy to embedded heater strips in cryo magnets. The amount of energy can be controlled by setting different charge different capacitor values. Two chassis' can be operated in series or interlocks are provided. The charge voltage, number of capacitors pulse can be monitored. There and dual channel has two discharge supplies in one chassis. This report reviews the characteristics of this power supply further

  8. Simplified design of switching power supplies

    CERN Document Server

    Lenk, John

    1995-01-01

    * Describes the operation of each circuit in detail * Examines a wide selection of external components that modify the IC package characteristics * Provides hands-on, essential information for designing a switching power supply Simplified Design of Switching Power Supplies is an all-inclusive, one-stop guide to switching power-supply design. Step-by-step instructions and diagrams render this book essential for the student and the experimenter, as well as the design professional. Simplified Design of Switching Power Supplies concentrates on the use of IC regulators. All popular forms of swit

  9. Poultry farming buildings. Natural gas heating. Guidebook of installation rules; Batiments d`elevage avicole. Chauffage au gaz. Guide des regles d`installation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The technical and economical performances of a poultry farm are greatly influenced by the mastery of ambient temperature during the first days of husbandry. The natural gas space heating installation must answer these requirements and also respect all safety rules concerning the personnel and the animals. In order to answer the questions of poultry farming professionals, the technical association of the natural gas industry (ATG) in France and the Groupama insurance company have redefined the new version of this brochure which integrates the recent technological advances and defines the minimum quality and safety rules required to achieve a natural gas heating installation. The different topics presented are: the gas supply (aerial fixed reservoirs), the general distribution panel (location, command systems, regulation systems for LPG installations, electrical equipments), the distribution pipes (general supply, indoor pipes, flexible pipes, pipe fittings), the heating systems (power, choice, power supply, fastening, air renewal), the check and sign and the start-up of the installation, the periodical control and maintenance operations. (J.S.)

  10. Status of magnet power supply development for the APS [Advanced Photon Source] storage ring

    International Nuclear Information System (INIS)

    McGhee, D.

    1989-01-01

    To simplify installation and speed testing of the Advanced Photon Source (APS) storage ring magnets, vacuum chambers and magnet power supplies, a modular approach was developed. All but the dipole magnets are independently controlled. Pulse width modulated dc-to-dc converters are used to power the individual magnets, with 12-pulse power supplies providing the raw dc to the converters. A magnet support base is the heart of a module and may hold as many as 7 magnets with 8 individually powered coils. The dc-to-dc converters are part of each magnet base module. This paper will show the modular approach which is used for the storage ring magnet systems and will give the test results of the prototype topology for the dc-to-dc converters that are being built and tested to power 680 quadrupole and sextupole magnets. 4 refs., 11 figs., 1 tab

  11. Employment within the power supply industry and the power supply related activities; Sysselsatte i kraftnaeringen og kraftrelatert virksomhet 2011

    Energy Technology Data Exchange (ETDEWEB)

    Thoen, Haavard

    2012-07-01

    The report's main objective is to investigate employment within the power supply industry and the power supply related activities. The report will describe the composition of employees in regard to sex, age and education. The power supply industry is defined in Statistics Norway's Standard Industrial Classification, as 'Production and distribution of electricity'. The group of companies related to power supply related activities employ similar persons in regard to education and occupation, typical to companies in the power supply industry. These two groups make up the power supply sector in this report. In 2011 there were 18 450 employees in the power supply sector. This constitutes an increase of nearly 13.5 per cent since 2004 and 1.1 per cent since 2010. The sex distribution of about 80 per cent men and 20 per cent women has been fairly stable since 2004. The power supply sector has a low share of women among its employees compared to the private sector in general. In 2011 the level of education in the power supply sector was higher than for the private sector in general. Since 2004, the share of persons with higher education has increased from 27 to 33 per cent. Employees in the power supply sector are on average older than employees in the private sector. The employees have matured since 2004, but in the last few years, there have also been signs of fresh recruitment. The power supply industry had a net influx of 380 new employees, in the period between 2009 and 2011. There were 1678 new employees and 1298 employees lost in the sector due to attrition. If we look at the supply of new employees who were also employed in 2010, 14.2 percent of female employees worked in temporary staff recruitment agencies. Temporary work seems to be an important entry gate to the power supply industry for women. Among men, the building- and construction sector was the most common background for new employees in the power supply industry. Among people who quit

  12. Switch mode power supply

    International Nuclear Information System (INIS)

    Kim, Hui Jun

    1993-06-01

    This book concentrates on switch mode power supply. It has four parts, which are introduction of switch mode power supply with DC-DC converter such as Buck converter boost converter, Buck-boost converter and PWM control circuit, explanation for SMPS with DC-DC converter modeling and power mode control, resonance converter like resonance switch, converter, multi resonance converter and series resonance and parallel resonance converters, basic test of SMPS with PWM control circuit, Buck converter, Boost converter, flyback converter, forward converter and IC for control circuit.

  13. Experience using individually supplied heater rods in critical power testing of advanced BWR fuel

    Energy Technology Data Exchange (ETDEWEB)

    Majed, M.; Morback, G.; Wiman, P. [ABB Atom AB, Vasteras (Sweden)] [and others

    1995-09-01

    The ABB Atom FRIGG loop located in Vasteras Sweden has during the last six years given a large experience of critical power measurements for BWR fuel designs using indirectly heated rods with individual power supply. The loop was built in the sixties and designed for maximum 100 bar pressure. Testing up to the mid eighties was performed with directly heated rods using a 9 MW, 80 kA power supply. Providing test data to develop critical power correlations for BWR fuel assemblies requires testing with many radial power distributions over the full range of hydraulic conditions. Indirectly heated rods give large advantages for the testing procedure, particularly convenient for variation of individual rod power. A test method being used at Stern Laboratories (formerly Westinghouse Canada) since the early sixties, allows one fuel assembly to simulate all required radial power distributions. This technique requires reliable indirectly heated rods with independently controlled power supplies and uses insulated electric fuel rod simulators with built-in instrumentation. The FRIGG loop was adapted to this system in 1987. A 4MW power supply with 10 individual units was then installed, and has since been used for testing 24 and 25 rod bundles simulating one subbundle of SVEA-96/100 type fuel assemblies. The experience with the system is very good, as being presented, and it is selected also for a planned upgrading of the facility to 15 MW.

  14. Choice evaluation of power supply composition using the mapping method of the long-term energy demand-and-supply scenario

    International Nuclear Information System (INIS)

    Tatematsu, Kenji

    2013-03-01

    Long-term energy demand-and-supply were analyzed for our country using the MARKAL model, supposing six kinds of energy demand-and-supply scenarios where different installed capacity of nuclear power generation and the emission standard of carbon-dioxide were employed. It was shown that even when nuclear power generation was not used, the carbon-dioxide emissions in the whole country and a power generation sector are reducible by 37% and 47% in 2050 from the 1990 level, respectively. However, when nuclear power generation was phase-out and renewable energy and natural gas were substituted, it was found that an average power generating cost was higher than the case where use of nuclear or coal was continued, 3.7 yen/kWh or more. Moreover, in the case where immediate cessation of the nuclear power generation was carried out, it was also shown that a current average power generating cost rose by 4.4 yen/kWh. In order to evaluate and visualize the influence of power supply composition change on both the average power generating cost and the carbon-dioxide emissions, a new mapping method was proposed where diversity of an energy source, the carbon-dioxide emissions, and the average power generating cost were used as indexes. Based on the result of model analysis, when nuclear power generation was substituted with renewable energy, natural gas, or coal, oligopoly of an energy source was shown to increase sharply by abolition of nuclear power generation. These results showed that by continuing use of the nuclear power generation with a fixed scale, less carbon-dioxide emissions, avoiding oligopolization of an energy source and suppressing the steep rise of an average power generating cost were possible. (author)

  15. The power supply system for the DEPFET pixel detector at BELLE II

    International Nuclear Information System (INIS)

    Rummel, Stefan

    2013-01-01

    The upgrade of the KEKB accelerator towards 8×10 35 cm −2 s −1 poses several challenges for the BELLE II detector. Especially the innermost detector will be faced with a significant radiation of several MRad per year as well as a high hit density. To cope with this a silicon pixel detector will be used for the inner layers of the silicon tracker. The pixel detector (PXD) consists of two layers of DEPFET active pixel sensors. The DEPFET technology has an unique set of advantages like low power dissipation in the active area, flexible device size, radiation hardness and a thinning procedure allowing to adjust the thickness of the device over a wide range. The two layers close to the interaction point together with a low material budget will improve the IP resolution by a factor of 2 compared to the previous installed silicon detector. In addition silicon stand-alone pattern recognition will be possible together with the four layers of double sided strip detectors (DSSD) of the strip detector. The PXD detector system consists of the DEPFET modules with integrated readout chips, the data handling hybrid receiving the data and sending them to compute nodes performing an online pattern recognition. Moreover the power supply system provides the supply voltages for the DEPFET from a position outside of the detector. The power distribution is designed to provide low output impedance over all frequencies and transient response with appropriate overshoots. The PXD pose several challenges to the power distribution system—number of voltages, tight requirements on regulation and noise. -- Highlights: ► The KEKB accelerator receive a luminosity upgrade towards 8×10 35 cm −2 s −1 . ► A two layer pixel detector based on the DEPFET technology will be installed. ► An improvement of a factor of 2 in. impact parameter resolution is expected. ► The 34 A dedicated power supply system for the detector is under development which aims for low noise, low output impedance

  16. General conditions for electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    If it is uncertain whether future power bills will be paid fully, it is admissible to take an action claiming a declaration which states that the electricity rate payment boycotter has no right to non-payment nor a right to withhold payment towards the electricity supply utility, and that the electricity supply utility has the right to stop energy supply because of reduced electricity rate payments effected and/or announced, and to denounce the contract without observing any term of notice. If the electricity buyer reduces a power bill to be paid without any legal grounds, the electricity supply utility has the right to stop power supplies and to denounce the power supply contract without observing any term of notice. The freedom of thought and the freedom of opinion must not be expressed by reducing power bills to be paid. Basic rights discontinue to be effective as soon as a contract or law is broken. A weighing of protected interests is not effected if the exercise of a basic law is unlawful. (orig./HP) [de

  17. Means of supply of extremely low-sulphur oil to the power plants of Stenungsund and Karlshamn

    International Nuclear Information System (INIS)

    1986-10-01

    The power plants in question are estimated to produce 10 TWh electric power per year and use about 2.4 Mtons of heavy fuel oil. This will imply a considerable increase of emission of acidifying sulphur oxides. The report discusses the cost of supplying low-sulphur fuel oils. The cost is compared with the cost of the installation of desulphurization of flue gas, oils or gasification

  18. Power supply system for KSTAR neutral beam injector

    Energy Technology Data Exchange (ETDEWEB)

    Cho, W., E-mail: franciscocho@nfri.re.kr; Bae, Y.S.; Han, W.S.; Jeong, J.H.; Kim, J.S.; Park, H.T.; Yang, H.L.; Oh, Y.K.; Kwak, J.G.

    2015-10-15

    Highlights: • The power supply system in KSTAR NBI consists of DC power supplies for ion source. • For operation NBI, DC High Voltage based on the low voltage transformer with chopper. • The surge absorber near the ion source limit the energy deposited to accelerator grid. - Abstract: The power supply system in KSTAR neutral beam injector consists of low voltage and high current DC power supplies for plasma generator of ion source and high voltage and high current DC power supply for accelerator grid system. The arc discharge is initiated by an arc power supply supplying the arc voltage between the chamber wall and 12 filaments which are heated by individual filament power supply. The negative output of arc power supply is common to each positive output of 12 filament power supplies. To interrupt the arc discharging for the fault condition of the arc current unbalance, DCCT current monitor is placed at the positive output cable of the filament power supply. The plasma grid (G1) power supply has the maximum capability of 120 kV/70 A which consists of low voltage regulator with IGBT-switched chopper array system for the voltage control in unit of 600 V and the high voltage rectified transformers to supply DC voltage of 20 kV, 30 kV, and 50 kV. The output voltage of the G1 power supply is also connected to the input of the voltage divider system which supplies the gradient voltage to the gradient grid (G2) in the range of 80–90% of G1 voltage by changing tap of winding resistors in unit of 1%. The charged G1 voltage is turned on and off by the high voltage switch (HVS) system consisting of MOSFET fast semiconductor switches which can immediately be opened less than 1 μs when the ion source grid breakdown occurs. The decelerating grid (G3) power supply is inverter system using capacitor-charge power supply to supply maximum −5 kV/5 A. The important component in power supply system is the surge absorber near the ion source to limit the arc energy deposited to

  19. Power supply system for KSTAR neutral beam injector

    International Nuclear Information System (INIS)

    Cho, W.; Bae, Y.S.; Han, W.S.; Jeong, J.H.; Kim, J.S.; Park, H.T.; Yang, H.L.; Oh, Y.K.; Kwak, J.G.

    2015-01-01

    Highlights: • The power supply system in KSTAR NBI consists of DC power supplies for ion source. • For operation NBI, DC High Voltage based on the low voltage transformer with chopper. • The surge absorber near the ion source limit the energy deposited to accelerator grid. - Abstract: The power supply system in KSTAR neutral beam injector consists of low voltage and high current DC power supplies for plasma generator of ion source and high voltage and high current DC power supply for accelerator grid system. The arc discharge is initiated by an arc power supply supplying the arc voltage between the chamber wall and 12 filaments which are heated by individual filament power supply. The negative output of arc power supply is common to each positive output of 12 filament power supplies. To interrupt the arc discharging for the fault condition of the arc current unbalance, DCCT current monitor is placed at the positive output cable of the filament power supply. The plasma grid (G1) power supply has the maximum capability of 120 kV/70 A which consists of low voltage regulator with IGBT-switched chopper array system for the voltage control in unit of 600 V and the high voltage rectified transformers to supply DC voltage of 20 kV, 30 kV, and 50 kV. The output voltage of the G1 power supply is also connected to the input of the voltage divider system which supplies the gradient voltage to the gradient grid (G2) in the range of 80–90% of G1 voltage by changing tap of winding resistors in unit of 1%. The charged G1 voltage is turned on and off by the high voltage switch (HVS) system consisting of MOSFET fast semiconductor switches which can immediately be opened less than 1 μs when the ion source grid breakdown occurs. The decelerating grid (G3) power supply is inverter system using capacitor-charge power supply to supply maximum −5 kV/5 A. The important component in power supply system is the surge absorber near the ion source to limit the arc energy deposited to

  20. Reliability of dc power supplies in nuclear power plant application

    International Nuclear Information System (INIS)

    Eisenhut, D.G.

    1978-01-01

    In June 1977 the reliability of dc power supplies at nuclear power facilities was questioned. It was postulated that a sudden gross failure of the redundant dc power supplies might occur during normal plant operation, and that this could lead to insufficient shutdown cooling of the reactor core. It was further suggested that this potential for insufficient cooling is great enough to warrant consideration of prompt remedies. The work described herein was part of the NRC staff's efforts aimed towards putting the performance of dc power supplies in proper perspective and was mainly directed towards the particular concern raised at that time. While the staff did not attempt to perform a systematic study of overall dc power supply reliability including all possible failure modes for such supplies, the work summarized herein describes how a probabilistic approach was used to supplement our more usual deterministic approach to reactor safety. Our evaluation concluded that the likelihood of dc power supply failures leading to insufficient shutdown cooling of the reactor core is sufficiently small as to not require any immediate action

  1. Upgrade of the Nuclotron power supply

    International Nuclear Information System (INIS)

    Karpinskij, V.N.; Kondrat'ev, N.G.; Osipenkov, A.L.

    2010-01-01

    One of topics of the Nuclotron development is the modification of its power supply scheme and upgrade of the energy evacuation system aimed to provide long and safe operation of the Nuclotron at the dipole magnetic field up to 2 T. It is necessary for the Nuclotron operation as a part of injection chain of the heavy ion collider under design at JINR as well as for fulfillment of its current scientific program. In the report the structure and peculiarity of the existing power supply system are described. The existing system is based on separated supply of dipole magnets and quadrupole lenses. General goals of the power supply modification are described, structural and principal schemes of the power supply, control system and the schemes of the energy evacuation key are presented

  2. Intelligent power supply controller

    International Nuclear Information System (INIS)

    Rumrill, R.S.; Reinagel, D.J.

    1991-01-01

    The authors have developed a new power supply controller which would combine 20-bit precision, simple interfacing, and versatile software control. It performs many tasks internal to the power supply and also communicates with an external host computer. Parameters can be entered and/or read over a serial link using one of the 82 command words. In addition, an optional remote control panel can be located up to thousands of feet away. This new controller will reduce the software development time normally spent by the user, while increasing the reliability of the system. The cost is less than buying the equivalent separate CAMAC system. Nonvolatile memory remembers all configuration data; one generic controller can thus be programmed to use anywhere from the smallest power supply to the largest. The controllers will be used at the Clinton P. Anderson Meson Facility at Los Alamos

  3. Mechanical strength integrity for crowbarred power supplies

    International Nuclear Information System (INIS)

    Broverman, A.Y.; Hill, R.E.

    1979-01-01

    Crowbarring the output of a power supply serves to electrically protect the power supply's load. At the same time, however, the supply's windings are subjected to the electromagnetic forces of a partial short circuit. Because pulsed power supplies are frequently crowbarred as a normal part of the duty cycle, it is essential that their transformer windings be designed to repetitively withstand short circuit forces. If not provided for, crowbar or short circuit forces can irreparably damage the transformer's coils. These power supplies are intended for fusion applications. 2 refs

  4. Power supply regulation systems installed in the Fermilab accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Hays, S.; Wolff, D.; Pfeffer, H.

    1991-11-01

    A variety of current and voltage regulation systems have been installed in the Fermilab large magnet system. The four major systems employ different methods to achieve the desired degree of regulation. The methods include computer control and feedback, adaptive learning, precision (10ppm) current monitoring, and the use of feed-forward signals. This paper will explain each method used and present the measured regulation of the above systems. Also an overview of planned upgrades and improvements will be presented.

  5. Principles and theory of resonance power supplies

    International Nuclear Information System (INIS)

    Sreenivas, A.; Karady, G.G.

    1991-01-01

    The resonance power supply is widely used and proved to be an efficient method to supply accelerator magnets. The literature describes several power supply circuits but no comprehensive theory of operation is presented. This paper presents a mathematical method which describes the operation of the resonance power supply and it can be used for accurate design of components

  6. Upgrading the TFTR Transrex Power Supplies

    International Nuclear Information System (INIS)

    Lawson, J.E.; Marsala, R; Ramakrishnan, S.; Zhao, X.; Sichta, P.

    2009-01-01

    In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the 'Hardwired Control System' will be replaces with a Programmable Logic Controller (PLC)

  7. Employment within the power supply industry and the power supply related activities 2010; Sysselsatte i kraftnaeringen og kraftrelatert virksomhet 2010

    Energy Technology Data Exchange (ETDEWEB)

    Thoen, Haavard

    2011-07-01

    The report's main objective is to investigate employment within the power supply industry and the power supply related activities. The report will describe the composition of employees in regard to sex, age and education. The power supply industry is defined in Statistics Norway's Standard Industrial Classification, as 'Production and distribution of electricity'. The group of companies related to power supply related activities employ similar persons in regard to education and occupation, typical to companies in the power supply industry. In the report, these two groups make up the power supply sector. In 2010 there were 18215 employees in the power supply sector. This constitutes an increase of nearly 12 per cent since 2004 and 1,7 per cent since 2008. The sex distribution of about 80 per cent men and 20 per cent women has been fairly stable since 2004. Compared to the private sector in general the power supply sector has a low share of women among its employees. In 2009 the level of education in the power supply sector was higher than for the private sector in general. Since 2004, the share of persons with higher education has increased from 27 to 33 per cent. Employees in the power supply sector are on an average older than the employees in the private sector. The employees have matured since 2004, but in the last few years, there have also been signs of fresh recruitment. The power supply industry had a net influx of 347 new employees, or 2 percent, in the period between 2009 and 2010. There were 1522 new employees and 1175 employees lost in the sector due to attrition, which gives a turnover rate of 20 percent. If we look at the supply of new employees who were also employed in 2009, 19 percent of female employees worked in temporary staff recruitment agencies. This indicates that temporary work was an entry gate to the power supply industry for many women. Among men, the building- and construction sector was the most common background for

  8. Operating experience feedback on lose of offsite power supply for nuclear power plant

    International Nuclear Information System (INIS)

    Jiao Feng; Hou Qinmai; Che Shuwei

    2013-01-01

    The function of the service power system of a nuclear power plant is to provide safe and reliable power supply for the nuclear power plant facilities. The safety of nuclear power plant power supply is essential for nuclear safety. The serious accident of Fukushima Daiichi nuclear power plant occurred due to loss of service power and the ultimate heat sink. The service power system has two independent offsite power supplies as working power and auxiliary power. This article collected events of loss of offsite power supply in operating nuclear power plants at home and abroad, and analyzed the plant status and cause of loss of offsite power supply events, and proposed improvement measures for dealing with loss of offsite power supply. (authors)

  9. Highly-stabilized power supply for synchrotron accelerators. High speed, low ripple power supply

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Kenji [Osaka Univ., Ibaraki (Japan). Research Center for Nuclear Physics; Kumada, Masayuki; Fukami, Kenji; Koseki, Shoichiro; Kubo, Hiroshi; Kanazawa, Toru

    1997-02-01

    In synchrotron accelerators, in order to utilize high energy beam effectively, those are operated by repeating acceleration and taking-out at short period. In order to accelerate by maintaining beam track stable, the tracking performance with the error less than 10{sup -3} in the follow-up of current is required for the power supply. Further, in order to maintain the intensity and uniformity of beam when it is taken out, very low ripple is required for output current. The power supply having such characteristics has been developed, and applied to the HIMAC and the SPring-8. As the examples of the application of synchrotrons, the accelerators for medical treatment and the generation of synchrotron radiation are described. As to the power supply for the deflection magnets and quadrupole magnets of synchrotron accelerators, the specifications of the main power supply, the method of reducing ripple, the method of improving tracking, and active filter control are reported. As to the test results, the measurement of current ripple and tracking error is shown. The lowering of ripple was enabled by common mode filter and the symmetrical connection of electromagnets, and high speed response was realized by the compensation for delay with active filter. (K.I.)

  10. From mains frequency to converter power supply in foundry melting operations; Von der Netzfrequenz- zur Umrichter-Stromversorgung im Schmelzbetrieb der Eisengiesserei

    Energy Technology Data Exchange (ETDEWEB)

    Doetsch, Erwin; Yildir, Yilmaz [ABP Induction Systems GmbH, Dortmund (Germany); Koch, Frank [Gusstec Weiherhammer GmbH, Weiherhammer (Germany)

    2010-06-15

    As is well known, converter-based power feed has now largely superseded line-frequency technology as state-of-the-art in supply of induction melting facilities. Replacement of LF power supply systems with converters is therefore the main priority in the context of projects for modernization of existing induction installations. The objective is generally to leave the crucible furnace and its peripherals effectively as they are, and match the output and frequency of the converter to their needs. The following article states the criteria that need to be taken into account in this context and examines a specific modernization project, using the example of Gusstec Weiherhammer GmbH's iron melting installation. (orig.)

  11. 7 CFR 1710.303 - Power cost studies-power supply borrowers.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Power cost studies-power supply borrowers. 1710.303... AND GUARANTEES Long-Range Financial Forecasts § 1710.303 Power cost studies—power supply borrowers. (a... facilities shall be supported by a power cost study to demonstrate that the proposed generation and...

  12. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  13. 46 CFR 113.10-9 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.10-9 Section 113.10-9 Shipping COAST... SYSTEMS AND EQUIPMENT Fire and Smoke Detecting and Alarm Systems § 113.10-9 Power supply. (a) General... battery, the charger must be supplied from the final emergency power source. Upon loss of power to the...

  14. Analog Fixed Maximum Power Point Control for a PWM Step-downConverter for Water Pumping Installations

    DEFF Research Database (Denmark)

    Beltran, H.; Perez, E.; Chen, Zhe

    2009-01-01

    This paper describes a Fixed Maximum Power Point analog control used in a step-down Pulse Width Modulated power converter. The DC/DC converter drives a DC motor used in small water pumping installations, without any electric storage device. The power supply is provided by PV panels working around....... The proposed Optimal Power Point fix voltage control system is analyzed in comparison to other complex controls....... their maximum power point, with a fixed operating voltage value. The control circuit implementation is not only simple and cheap, but also robust and reliable. System protections and adjustments are also proposed. Simulations and hardware are reported in the paper for a 150W water pumping application system...

  15. Measurements of crowbar performance of the 20 kV 130 A dc power supply of the TRIUMF RF system

    International Nuclear Information System (INIS)

    Mitra, A.K.

    1991-05-01

    The TRIUMF RF system operates at a fixed frequency of 23.06 MHz with a power capability of 1800 kW. The dc plate power for the four push-pull power amplifiers is provided by a single dc power supply at 20 kV, 130 A and the amplifiers are protected by a single ignitron crowbar circuit. In the case of voltage breakdown outside the tube, the triggering of the crowbar circuit relies on the voltage developed across a low resistance shunt in the return path of the common dc power supply. Frequent failure of the crowbar ignitrons following an external dc voltage breakdown led to the investigation of the crowbar performance. Current transformers have been installed in the common B + line to the power amplifiers and the anode circuit of the ignitron crowbar in order to measure amplitude, duration and time delay of various dc currents under fault conditions. Similar current transformers were installed in the individual anode circuits of the power amplifiers to provide protection to the complete system in case of an external dc voltage breakdown. The results of these measurements and recommended solutions for operations are reported. (Author) 3 refs., 4 figs

  16. Defence in depth for electric power supplies in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Gupta, S.K.; Srivasista, K.; Solanki, R.B.

    2009-01-01

    The purpose of electric power supply system in a nuclear power plant is to supply and distribute reliable electric power to safety related systems and systems important to safety in various forms, arrangements and combinations of redundancy and diversity in order to perform safety functions required during operational states and design basis events (DBE) such as shutting down the reactor, maintaining the reactor in safe shutdown state, containment isolation and reactor core cooling preventing significant release of radioactive material to the environment. Hence the design basis of electric power supply systems includes identification of DBE that require power supplies, adequacy of redundancy and diversity, environmental conditions to which electric equipment are qualified, identification of loads requiring interrupted and uninterrupted power supplies, time sequence in which emergency loads are to be supplied in case of interruption, provisions for maintaining and testing, consideration for minimum duration capability of emergency power supplies during station blackout etc. Based on operation experience, results of probability safety assessment and certain weaknesses noticed in defence in depth of electric power supply systems, several continuous design improvements have been made in Indian nuclear power plants during operating phase and life extension. Instituting various tests during initial commissioning, subsequent operation and life extension has ensured high standards of performance of electric power supplies. Some of these aspects are highlighted in this paper

  17. Power supply control protocol used at GANIL

    International Nuclear Information System (INIS)

    Prome, M.; Baumgarten, R.; Luong, T.T.

    1986-01-01

    This document intends to establish specifications for power supply control so that, if complied with by power supply manufacturers, power supplies from any manufacturer can be linked at once to the Ganil Control system. The only points to take care of are reduced to physical link and filling of the data base

  18. The situation of European power supply

    International Nuclear Information System (INIS)

    Zimmer, H.J.

    2008-01-01

    The requirement for energy worldwide is going to rise dramatically in the next few years and decades. Despite all developments of renewable energy sources, and despite the expansion of nuclear power in some industrialized countries and emerging countries, coal will turn out to be the key source of energy in the 21st century. Europe as a whole has a lot to offer which strengthens its position with respect to present and future requirements to be met in the construction of new power plants as well as in electricity and power supplies. As regards nuclear power in Germany, if it is to be given another chance, we must seek a dialog, pointing out that - nuclear power offers advantages in ensuring energy supply in Germany, given the development in the world energy markets; - nuclear power makes an important contribution to climate protection; - Germany's energy supply must be adapted to the global situation; - nuclear power offers opportunities in education, training, research and development; - nuclear power is contributing massively to our economic prosperity. The future viability of European power supply will not depend on the debate about nuclear power in Germany. The debate will be decided chiefly by the world market and on a European level. (orig.)

  19. Optimum design of a nuclear heat supply

    International Nuclear Information System (INIS)

    Borel, J.P.

    1984-01-01

    This paper presents an economic analysis for the optimum design of a nuclear heat supply to a given district-heating network. First, a general description of the system is given, which includes a nuclear power plant, a heating power plant and a district-heating network. The heating power plant is fed with steam from the nuclear power plant. It is assumed that the heating network is already in operation and that the nuclear power plant was previously designed to supply electricity. Second, a technical definition of the heat production and transportation installations is given. The optimal power of these installations is examined. The main result is a relationship between the network capacity and the level of the nuclear heat supply as a substitute for oil under the best economic conditions. The analysis also presents information for choosing the best operating mode. Finally, the heating power plant is studied in more detail from the energy, technical and economic aspects. (author)

  20. Analysis of the Potential for Use of Floating PV Power Plant on the Skadar Lake for Electricity Supply of Aluminium Plant in Montenegro

    Directory of Open Access Journals (Sweden)

    Vladan Durković

    2017-09-01

    Full Text Available This paper deals with a conceptual solution for the supply of a part of electrical energy for the needs of Aluminium Plant Podgorica (KAP in Montenegro from a large Floating Photovoltaic Power Plant (FPPP, that would be installed on the nearby lake. The recommended FPPP, with an innovative azimuth angle control method and total installed power of 90 MWp, would consist of 18 power plants having an installed power of 5 MWp each. An analysis using the NREL solar insolation database ascertained that the recommended FPPP power plant can achieve a significantly higher production in comparison with previous solutions. An economic analysis has shown that the recommended power plant would yield positive economic indicators. Additionally, such a power plant would significantly contribute to the reduction of CO2 emissions.

  1. A battery-powered high-current power supply for superconductors

    CERN Document Server

    Wake, M; Suda, K

    2002-01-01

    Since superconductors do not require voltages, a high-current power supply could run with low power if the voltage is sufficiently reduced. Even a battery-powered power supply could give as much as 2,000A for a superconductor. To demonstrate this hypothesis, a battery-powered 2,000A power supply was constructed. It uses an IGBT chopper and Schottky diode together with a specially arranged transformer to produce a high current with low voltage. Testing of 2,000A operation was performed for about 1.5 hr using 10 car batteries. Charging time for this operation was 8 hr. Ramping control was smooth and caused no trouble. Although the IGBT frequency ripple of 16.6 kHz was easily removed using a passive filter, spike noise remained in the output voltage. This ripple did not cause any trouble in operating a pancake-type inductive superconducting load. (author)

  2. Control units for APS power supplies

    International Nuclear Information System (INIS)

    Despe, O.D.; Saunders, C.; McGhee, D.G.

    1993-01-01

    The Advanced Photon Source (APS) accelerator facility is made up of five major subsystems in addition to the linac: the positron accumulator ring (PAR), low energy transport (LET), booster synchrotron (SYNCH), high energy transport (HET), the storage ring (SR). Each subsystem has multiple magnet power supply combinations, some requiring multiple of operation. These magnet and power supply combinations computer controlled and monitored. The power supply control unit (PSCU) is the first layer of hardware and software above the power supply itself and is described in this paper. The description includes the basic philosophy for each of operation and how it influences the topology and of implementing control. The design of the analog reference blocks (ARBs) influenced the design of other custom functions well as the feedback controls for vibration and other dynamic corrections. The command set supported by the PSCU is discussed

  3. Detailed feasibility study of a small-hydro power plant in Zerni on the municipal drinking water supply; Etude detaillee de faisabilite pour l'installation d'une petite centrale sur l'adduction d'eau potable de Zerni - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Reul, B. [MHyLab, Montcherand (Switzerland); Perruchoud, A. [SierreEnergie SA, Sierre (Switzerland)

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the municipal drinking water supply of the city of Sierre, Switzerland. The installation is to be made at the site of a new reservoir in Zerni. The report presents details on the hydrological data and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the applicable water regulations. The electricity production expected is discussed, as is the economic viability of the project.

  4. Design of neutral beam injection power supplies for ITER

    International Nuclear Information System (INIS)

    Watanabe, Kazuhiro; Okumura, Yoshikazu; Ono, Youichi; Tanaka, Masanobu

    2000-03-01

    Design study on a power supply system for the ITER neutral beam injector(NBI) has been performed. Circuits of converter/inverter system and other components of the acceleration power supply whose capacity is 1 MV, 45 A have been designed in detail. Performance of the negative ion production power supplies such as an arc and an extraction power supplies was investigated using the EMTDC code. It was confirmed that ripples of 0.34%p-p for the extraction power supply and 1.7%p-p for the arc power supply are small enough. It was also confirmed that an energy input to a negative ion generator from the arc power supply at an arcing can be suppressed smaller than 8 J. The extraction power supply was designed to suppress the energy input lower than 13 J at the breakdown in the extractor. These performances satisfy the required specification of the power supply system. (author)

  5. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  6. Grid Connected Power Supplies for Particle Accelerator Magnets

    DEFF Research Database (Denmark)

    Nielsen, Rasmus Ørndrup

    Power supplies play a large role in particle accelerators, for creating, accelerating, steering and shaping the beam. This thesis covers the power supplies for steering and shaping the beam, namely the magnet power supplies. These power supplies have a special set of requirements regarding output...... on this topology is constructed using a single power module on the grid side of the transformer, consisting of a boost rectifier and a dual half-bridge isolated DC/DC converter. It is shown that it is possible to create a power supply using a single module and that this approach can lead to improved layout...... and smaller converter size. A high efficiency converter based on Silicon Carbide switching devices is also presented exhibiting above 96 % efficiency for the entire power range. Finally reliability issues are considered as the reliability of a particle accelerator supply is of utmost importance. Particle...

  7. Positron Accumulator Ring (PAR) power supply

    International Nuclear Information System (INIS)

    Fathizadeh, M.

    1995-01-01

    The Positron Accumulator Ring (PAR) consists of 8 dipole magnets connected in series. These magnets are energized via one 12-pulse dc power supply. The power supply consists of four phase controlled half-wave wye group converters. Each of the two half-wave converters are connected through an interphase transformer to obtain a full-wave converter with 120 degrees conduction. The input voltage for these two half-wave converters are 180 degrees apart. The two full-wave converters are connected in parallel through a third interphase transformer. This type of connection of the converters not only provides the required output current, it also improves the input power factor of the power supply. The output of the wye group converters is filtered through a passive L-R-C filter to reduce the ripple content of the output current. At low current values of the power supply the current ripple is high, thus a large filter is needed, which adds to the cost of the power supply, however at high output current levels, the current ripple is less severe. The large size of the filter can be reduced by adding an anti-parallel rectifier diode(D1) to the output of the power supply. A freewheeling diode(D2) is connected before the choke to circulate the current once the power supply is turned off. In order to measure the current in the magnet a high precision, low drift, zero flux current transductor is used. This transductor senses the magnet current which provides a feedback signal to control the gating of the converter's thyristors. A true 14 bit Digital to Analog Converter (DAC) is programmed by the control computer for the required current value, providing a reference for the current regulator. Fast correction of the line transients is provided by a relatively fast voltage loop controlled by a high gain slow response current loop

  8. Development of high-stability magnet power supply

    Energy Technology Data Exchange (ETDEWEB)

    Choi, W.S.; Kim, M.J.; Jeong, I.W. [Graduate School of Wind Energy, Pohang University of Science and Technology, 77 Cheongam-ro, Nam-gu, Pohang, Gyeongbuk 37673 (Korea, Republic of); Kim, D.E. [Pohang Accelerator Laboratory, Pohang University of Science and Technology, 80 Jigokro-127-beongil, Nam-gu, Pohang, Gyeongbuk 37673 (Korea, Republic of); Park, H.C. [Graduate School of Wind Energy, Pohang University of Science and Technology, 77 Cheongam-ro, Nam-gu, Pohang, Gyeongbuk 37673 (Korea, Republic of); Park, K.H. [Pohang Accelerator Laboratory, Pohang University of Science and Technology, 80 Jigokro-127-beongil, Nam-gu, Pohang, Gyeongbuk 37673 (Korea, Republic of)

    2016-06-21

    A very stable (≤10 ppm) magnet power supply (MPS) is required in an accelerator to achieve acceptable beam dynamics. Many factors affect the stability of an MPS, so design of the MPS requires much attention to noise-reduction schemes and to good processing of the signals from the feedback stage. This paper describes some design considerations for an MPS installed and operated in the Pohang Accelerator Laboratory: (1) control method, (2) oversampling technology, (3) ground isolation between hardware modules and (4) low-pass filter design to reduce the switching noise and rectifier ripple components, and shows the stability of three designed devices. The MPS design considerations were verified and validated in simulations and experiments. This paper also shows the relationship between stability and measurement aperture time of digital voltage meter 3458 A to measure stability of a current.

  9. Accelerator magnet power supply using storage generator

    International Nuclear Information System (INIS)

    Karady, G.; Thiessen, H.A.

    1987-01-01

    Recently, a study investigated the feasibility of a large, 60 GeV accelerator. This paper presents the conceptual design of the magnet power supply (PS() and energy storage system. The main ring magnets are supplied by six, high-voltage and two, low-voltage power supplies. These power supplies drive a trapezoidal shaped current wave through the magnets. The peak current is 10 kA and the repetition frequency is 3.3 Hz. During the acceleration period the current is increased from 1040 A to 10,000 A within 50 msec which requires a loop voltage of 120 kV and a peak power of 1250 MW. During the reset period, the PS operates as an inverter with a peak power of -1250 MW. The large energy fluctuation necessitates the use of a storage generator. Because of the relatively high operation frequency, this generator operates in a transient mode which significantly increases the rotor current and losses. The storage generator is directly driven by a variable speed drive, which draws a practically constant power of 17 MW from the ac supply network and eliminates the pulse loading. For the reduction of dc ripple, the power supplies operate in a 24 pulse mode

  10. Mobile medium-voltage switching system. Temporary standby power supply in record time; Mobile Mittelspannungsschaltanlage. Vorlaeufige Wiederversorgung in Rekordzeit

    Energy Technology Data Exchange (ETDEWEB)

    Thiery, Matthias; Schwarz, Stefan [Siemens AG, Mannheim (Germany); Wingerter, Dieter [BASF SE, Ludwigshafen (Germany); Doering, Holger [B. Goebel und Sohn GmbH, Asschaffenburg (Germany). Fahrzeugbau

    2011-02-28

    BASF SE Ludwigshafen operates more than 100 medium-voltage switching stations for power supply to its plants. The complexity of the production plants and production method make it necessary to have immediate standby power supply in case of interruption of a medium-voltage switching station. For this purpose, a transportable emergency container was acquired that contains a medium-voltage switching system. Power can be supplied at very short notice, simply by plugging the necessary cable connections. No cranes or other tools are required for installation. The emergency container is designed for use at varying voltage levels and can be transported by road to other BASF sites in Europe. The switching station is a gas-insulated medium-voltage switching station 8DA10 by Siemens, designed for operating voltages of 6, 10, 20, and 35 kW.

  11. Effect of energy saving lights on power supply

    NARCIS (Netherlands)

    Timens, R.B.; Buesink, Frederik Johannes Karel; Leferink, Frank Bernardus Johannes

    2012-01-01

    Weak power supply networks are very sensitive to non-linear low power loads. Electronics in low power loads are non-linear, very basic, and consisting of a rectifier bridge and bulk capacitor, consuming current only in the peak of the supplied voltage. Due to the relative high power supply network

  12. Outline of additional installation works in Oi Nuclear Power Station

    International Nuclear Information System (INIS)

    Shibata, Atsuo; Matsuoka, Motokazu

    1987-01-01

    At present in Oi Nuclear Power Station, Kansai Electric Power Co., Inc., No.1 and No.2 plants of 1175 MWe each are in operation. In order to stabilize power supply for a long term, the additional installation of No.3 and No.4 plants of 1180 MWe each is in progress. The No.3 and No.4 plants are PWRs, for which prestressed concrete reactor containment vessels were adopted, and the start of operation is scheduled in October, 1991 in No.3 plant and in August, 1992 in No.4 plant. In the execution of main construction works, the preservation of the existing plants is the most important. For excavating the tunnels for seawater channels, tunnel boring machines were used, to avoid blasting. Pneumatic caisson method was adopted for a part of the circulating pump building. No vibration, no noise piling method was adopted for respective sheathing construction. The blasting vibration control in the excavation for foundations and the analysis of the behavior of retaining walls are to be carried out by information-oriented work execution. The outline of the main construction works and the preservation of the existing facilities are reported. (Kako, I.)

  13. Nuclear power: energy security and supply assurances

    International Nuclear Information System (INIS)

    Rogner, H.H.; McDonald, A.

    2008-01-01

    Expectations are high for nuclear power. This paper first summarizes recent global and regional projections for the medium-term, including the 2007 updates of IAEA projections plus International Energy Agency and World Energy Technology Outlook projections to 2030 and 2050. One driving force for nuclear power is concern about energy supply security. Two potential obstacles are concerns about increased nuclear weapon proliferation risks, and concerns by some countries about potential politically motivated nuclear fuel supply interruptions. Concerning supply security, the paper reviews different definitions, strategies and costs. Supply security is not free; nor does nuclear power categorically increase energy supply security in all situations. Concerning proliferation and nuclear fuel cut-off risks, the IAEA and others are exploring possible 'assurance of supply' mechanisms with 2 motivations. First, the possibility of a political fuel supply interruption is a non-market disincentive discouraging investment in nuclear power. Fuel supply assurance mechanisms could reduce this disincentive. Second, the risk of interruption creates an incentive for a country to insure against that risk by developing a national enrichment capability. Assurance mechanisms could reduce this incentive, thereby reducing the possible spread of new national enrichment capabilities and any associated weapon proliferation risks. (orig.)

  14. PSC/PSI power supply control prototype based on RTEMS

    International Nuclear Information System (INIS)

    Shi Haoli; Wang Chunhong; Tang Jingyu

    2010-01-01

    A PSC/PSI power supply control prototype was developed by using an open-source real-time operating system RTEMS and PSC/PSI power supply controller developed by BNL. The structure of the prototype, development procedures as well as testing result with a power supply of a corrector magnet were described. It can switch on/off the power supply, ramp up/down the current, and monitor the real-time states of the power supply. (authors)

  15. Innovative Digitally Controlled Particle Accelerator Magnet Power Supply

    DEFF Research Database (Denmark)

    Nielsen, Rasmus Ørndrup; Bidoggia, Benoit; Maheshwari, Ram Krishan

    2013-01-01

    Particle accelerator magnet power supplies needs to be extremely precise. A new and innovative power supply for particle accelerator magnets is proposed. The topologies for the input and the output converter are shown and the control architecture is described.......Particle accelerator magnet power supplies needs to be extremely precise. A new and innovative power supply for particle accelerator magnets is proposed. The topologies for the input and the output converter are shown and the control architecture is described....

  16. LHC Power Distribution

    CERN Document Server

    Pedersen, J

    1999-01-01

    The power distribution for the LHC machine and its experiments will be realised making extensive use of the existing infrastructure for the LEP. The overall power requirement is approximately the same, about 125 MW. The load distribution will however change. The even points will loose in importance and the points 1 and 5 will, due to the installation of ATLAS and CMS, gain. A thorough reorganisation of the 18 kV distribution will thus be necessary. Due to the important cryogenic installations required for the LHC, the 3.3 kV distribution system, supplying mainly cryogenic compressors, will be extended with a number of new substations. The important number of new surface buildings, underground caverns and other underground structures all will receive general service installations: Lighting and power. The new injection tunnels will require complete installations: A.C. supplies for the power converters and for general service, and D.C. cabling for the magnets of the beam line. Special safe power installations ar...

  17. 1000-kVA arc power supply

    International Nuclear Information System (INIS)

    Wright, R.E.; Barber, G.C.; Ponte, N.S.

    1979-01-01

    Because of ever-increasing power demands for the development of the Oak Ridge duoPIGatron ion source, a continuous-duty arc power supply was constructed for the Medium Energy Test Facility (METF) to furnish power for the plasma generator of experimental ion sources. The power supply utilizes 12-pulse rectification with half-wave switching in a delta and wye full-wave bridge that may be connected in series or parallel. It will deliver 340 V dc, 2500 A to an ion source when series connected and 170 V dc, 5000 A when paralleled connected. Silicon-controlled rectifiers (SCR) in each rectifier bridge can be switched for pulses as short as 10 ms through continuous duty. The filter section that reduces the ripple in the output consists of an inductor-to-capacitor (L-C) filter to smooth the 720-Hz pulses. The power transformer serves as an isolation transformer allowing the secondary to be elevated to the accelerating potential of the ion source. The dc output level is controlled with a 1000-kVA auto transformer connected to the primary of the power transformer. All elevated voltages and currents are monitored at ground potential with an optical telemetry system. This paper describes the power supply in detail, including block diagrams, component specifications, and waveforms when supplying power to an ion source

  18. Influencing the central heating technologies installed in homes: The role of social capital in supply chain networks

    International Nuclear Information System (INIS)

    Wade, Faye; Shipworth, Michelle; Hitchings, Russell

    2016-01-01

    The likely installation of, and potential energy savings from, low carbon technologies in domestic buildings is not only dependent on those who fit them, but also the broader supply chains of which they are part. Despite this, the role of supply chain actors has been largely overlooked in strategies seeking to encourage the installation of more sustainable domestic heating technologies. With reference to central heating, this paper responds through an ethnographic analysis of how plumbers' merchants and sales representatives can influence the work of heating installers in the United Kingdom. It applies two dimensions of the concept of ‘social capital’: relational and structural. Relational social capital focuses on the trust, loyalty and reciprocity at play in relations, whilst structural social capital considers how the strength of tie can influence those to whom people turn for advice and support. Together, these ideas demonstrate how relationships amongst these groups can serve to influence product choice and facilitate information exchange. The paper concludes by discussing how these supply chains might be engaged with as a means of encouraging the installation of low carbon domestic technologies. - Highlights: •Ethnography is used to investigate the relationships in heating supply chains. •Social capital is seen to be an important part of these relationships. •These relationships could help in the promotion of low carbon technologies.

  19. Design and installation package for a solar powered pump

    Science.gov (United States)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  20. Controlled power supply for isotopes separator

    International Nuclear Information System (INIS)

    Lavaitte, A.; Pottier, J.

    1953-01-01

    This equipment is destined to equip the separator of isotopes who is the subject of the CEA report n 138. It includes: - a controlled power supply in voltage. - a controlled power supply in current. The spectra of fluctuations of these assembly is different in the two cases. (authors) [fr

  1. Modular High Voltage Power Supply

    Energy Technology Data Exchange (ETDEWEB)

    Newell, Matthew R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-18

    The goal of this project is to develop a modular high voltage power supply that will meet the needs of safeguards applications and provide a modular plug and play supply for use with standard electronic racks.

  2. Power supplies for the injector synchrotron quadrupoles and sextupoles

    International Nuclear Information System (INIS)

    Fathizadeh, M.

    1995-01-01

    This light source note will describe the power supplies for the injector synchrotron quadrupole and sextupole magnets. The injector synchrotron has two families of quadrupole magnets. Each family consists of 40 quadrupole magnets connected in series. These magnets are energized by two phase-controlled, 12-pulse power supplies. Therefore, each power supply will be rated to deliver the necessary power to only 40 quadrupole magnets. The two families of sextupole magnets in the injector synchrotron each consists of 32 sextupole magnets connected in series, powered by a phase-controlled power supply. Thus, each power supply shall be capable of delivering power to only 32 sextupole magnets

  3. E-beam high voltage switching power supply

    Science.gov (United States)

    Shimer, Daniel W.; Lange, Arnold C.

    1997-01-01

    A high power, solid state power supply is described for producing a controllable, constant high voltage output under varying and arcing loads suitable for powering an electron beam gun or other ion source. The present power supply is most useful for outputs in a range of about 100-400 kW or more. The power supply is comprised of a plurality of discrete switching type dc-dc converter modules, each comprising a voltage regulator, an inductor, an inverter for producing a high frequency square wave current of alternating polarity, an improved inverter voltage clamping circuit, a step up transformer, and an output rectifier for producing a dc voltage at the output of each module. The inputs to the converter modules are fed from a common dc rectifier/filter and are linked together in parallel through decoupling networks to suppress high frequency input interactions. The outputs of the converter modules are linked together in series and connected to the input of the transmission line to the load through a decoupling and line matching network. The dc-dc converter modules are phase activated such that for n modules, each module is activated equally 360.degree./n out of phase with respect to a successive module. The phased activation of the converter modules, combined with the square current waveforms out of the step up transformers, allows the power supply to operate with greatly reduced output capacitance values which minimizes the stored energy available for discharge into an electron beam gun or the like during arcing. The present power supply also provides dynamic response to varying loads by controlling the voltage regulator duty cycle using simulated voltage feedback signals and voltage feedback loops. Circuitry is also provided for sensing incipient arc currents reflected at the output of the power supply and for simultaneously decoupling the power supply circuitry from the arcing load.

  4. E-beam high voltage switching power supply

    International Nuclear Information System (INIS)

    Shimer, D.W.; Lange, A.C.

    1997-01-01

    A high power, solid state power supply is described for producing a controllable, constant high voltage output under varying and arcing loads suitable for powering an electron beam gun or other ion source. The present power supply is most useful for outputs in a range of about 100-400 kW or more. The power supply is comprised of a plurality of discrete switching type dc-dc converter modules, each comprising a voltage regulator, an inductor, an inverter for producing a high frequency square wave current of alternating polarity, an improved inverter voltage clamping circuit, a step up transformer, and an output rectifier for producing a dc voltage at the output of each module. The inputs to the converter modules are fed from a common dc rectifier/filter and are linked together in parallel through decoupling networks to suppress high frequency input interactions. The outputs of the converter modules are linked together in series and connected to the input of the transmission line to the load through a decoupling and line matching network. The dc-dc converter modules are phase activated such that for n modules, each module is activated equally 360 degree/n out of phase with respect to a successive module. The phased activation of the converter modules, combined with the square current waveforms out of the step up transformers, allows the power supply to operate with greatly reduced output capacitance values which minimizes the stored energy available for discharge into an electron beam gun or the like during arcing. The present power supply also provides dynamic response to varying loads by controlling the voltage regulator duty cycle using simulated voltage feedback signals and voltage feedback loops. Circuitry is also provided for sensing incipient arc currents reflected at the output of the power supply and for simultaneously decoupling the power supply circuitry from the arcing load. 7 figs

  5. Innovative use of power integrated modules for DC power supplies

    DEFF Research Database (Denmark)

    Ørndrup Nielsen, Rasmus; Elkiær, Alexander; Munk-Nielsen, Stig

    2013-01-01

    In this article several innovative ways of utilizing Power Integrated Modules (PIM) as switching device in a DC power supply are presented. PIM have advantages in compactness of design, cost and fast prototype due to easier PCB layout. A PIM converter topology is chosen and designed resulting...... in an experimental setup. Results from the setup are presented showing the feasibility of using a PIM module as almost all power semiconductors in a DC power supply....

  6. TECHNICAL AND ECONOMIC EVALUATION OF OPTIMAL VOLTAGE LEVEL FOR THE POWER SUPPLY OF DEEP MINE OPERATING HORIZONS

    OpenAIRE

    Shkrabets, F. P.; Ostapchuk, O. V.; Kozhevnikov, A. V.; Akulov, A. V.

    2015-01-01

    The most perspective option for possible deep mine power supply is the one with the deep input of 35 kV voltage by installing of underground 35kV/6 kV substation. This option is caused by the expected level of electrical loads, provided by mine development, the power consumers’ deep layout (considering the distance from the source to the shaft on the surface and from the shaft to the underground substation chamber) and primary and the most responsible power consumers (blind shaft lifting devi...

  7. Charging system of ECRH high-voltage power supply and its control system

    International Nuclear Information System (INIS)

    Hu Guofu; Ding Tonghai; Liu Baohua; Jiang Shufang

    2003-01-01

    High-voltage power supply (HVPS) of Electron Cyclotron Resonance Heating (ECRH) for HT-7 and HT-7U is presently being constructed. The high voltage (100 kV) energy of HVPS is stored in the capacitor banks, and they can power one or two gyrotrons. All the operation of the charging system will be done by the control system, where the field signals are interfaced to programmable logic controller (PLC). The use of PLC not only simplifies the control system, but also enhances the reliability. The software written by using configuration software installed in the master computer allows for remote and multiple operator control, and the status and data information is also remotely available

  8. Nuclear steam supply system KLT-40 enhanced safety as independent power supply source. Employment prospects

    International Nuclear Information System (INIS)

    Polunichev, V.I.; Sayanov, D.G.; Ardabievsky, A.A.

    1993-01-01

    High quality of KLT-40 nuclear steam supply system (NSSS) providing enhanced safety is attained owing to the development and operation experience of equipments and systems in Soviet nuclear icebreakers. First of all they are the operating nuclear-powered icebreakers open-quotes Arktikaclose quotes, open-quotes Sibirclose quotes, open-quotes Rossiyaclose quotes, open-quotes Sovetsky Soyuzclose quotes, the limited draught icebreakers of joint Soviet-Finnish manufacturing open-quotes Taimyrclose quotes open-quotes Vaigachclose quotes. 30-years trouble-free operation of icebreaker open-quotes Leninclose quotes, the ancestor of nuclear powered fleet, is unprecedented. Operation life of individual equipment items amounts to 107000 hours, that testifies to high reliability and life characteristics of NSSS. Trouble-free operation of the nuclear-powered icebreakers' reactor plants (RPs) exceeded 130 reactor years, that proves high quality of design decisions being underlain in the basis of the KLT-40 NSSS for the lighter-cargo carrier open-quotes Sevmorputclose quotes, which was put into operation into 1988. Besides it testifies to the expediency of KLT-40 NSSS employment as a power source in different power installations. The KLT-40 is a reactor plant with a pwr type reactor. The design is described in detail with diagrams

  9. A design of electric power supply system for gamma irradiator ISG-500

    International Nuclear Information System (INIS)

    Harno Garnito; Enggar; Harjani; Ari Satmoko; Sutomo Budihaharjo

    2010-01-01

    Reliability of electrical power system in Irradiator system is absolutely necessary during the life cycle. Electrical energy is used as the main supporting element for both Irradiator operation of mechanical system, lighting, as well as for instrumentation and control systems. The reliability of electrical power system in the system can be achieved by paying attention Irradiator safety, simplicity of operation, ease of maintenance and possible future development. Distribution network of the most commonly used is the Radial network system, for the simple and in accordance with the criteria demanded by a distribution system. In addition to the network system, to get the reliability of electric power supply system is the selection of equipment/materials that meet the standards, and the installation of which provide facilities for maintenance and repairs. (author)

  10. Limitation of fusion power plant installation on future power grids under the effect of renewable and nuclear power sources

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Shutaro, E-mail: takeda.shutarou.55r@st.kyoto-u.ac.jp [Graduate School of Advanced Integrated Studies in Human Survivability, Kyoto University, Kyoto, Kyoto (Japan); Sakurai, Shigeki [Graduate School of Advanced Integrated Studies in Human Survivability, Kyoto University, Kyoto, Kyoto (Japan); Yamamoto, Yasushi [Faculty of Engineering Science, Kansai University, Suita, Osaka (Japan); Kasada, Ryuta; Konishi, Satoshi [Institute of Advanced Energy, Kyoto University, Uji, Kyoto (Japan)

    2016-11-01

    Graphical abstract: - Highlights: • Future power grids would be unstable due to renewable and nuclear power sources. • Output interruptions of fusion plant would cause disturbances to future grids. • Simulation results suggested they would create limitations in fusion installation. • A novel diagram was presented to illustrate this suggested limitation. - Abstract: Future power grids would be unstable because of the larger share of renewable and nuclear power sources. This instability might bring some additional difficulties to fusion plant installation. Therefore, the authors carried out a quantitative feasibility study from the aspect of grid stability through simulation. Results showed that the more renewable and nuclear sources are linked to a grid, the greater disturbance the grid experiences upon a sudden output interruption of a fusion power plant, e.g. plasma disruption. The frequency deviations surpassed 0.2 Hz on some grids, suggesting potential limitations of fusion plant installation on future grids. To clearly show the suggested limitations of fusion plant installations, a novel diagram was presented.

  11. Power supply and ethics

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    The 'Power Supply and Ethics' workshop was designed on the basis of a recommendation by the Nuclear Technology Committee (FA-KT) of VDI-GET. The topic is part of a series of events and publications by VDI in an area where engineering and the humanities converge. The Workshop comprised presentations and thorough discussions of seven papers on 'Power Supply and Ethics', reflecting a variety of contents and points of view of the different disciplines participating. The Workshop offered another opportunity to take the initiative and influence the public, especially politics. Other activities are planned which also the participants increasingly consider an obligation to the public. (orig.) [de

  12. Study of Contactless Power Supply for Spindle Ultrasonic Vibrator

    Science.gov (United States)

    Chen, T. R.; Lee, Y. L.; Liu, H. T.; Chen, S. M.; Chang, H. Z.

    2017-11-01

    In this study, a contactless power supply for the ultrasonic motor on the spindle is proposed. The proposed power supply is composed of a series-parallel resonant circuit and a cylindrical contactless transformer. Based on the study and rotation experiments, it can be seen that the proposed power supply can both provide a stable ac power with 25 kHz / 70 V to the ultrasonic motor. When the output power is 250 W, the efficiency of the proposed supply is 89.8 % in respectively rotation tests. When the output power is more than 150 W, the efficiency of the proposed supply is higher than 80 % within the rated output power range.

  13. Concentrated Solar Power as part of the European energy supply. The realization of large-scale solar power plants. Options, constraints and recommendations

    International Nuclear Information System (INIS)

    Bouwmans, I.; Carton, L.J.; Dijkema, G.P.J.; Stikkelman, R.M.; De Vries, L.J.

    2006-01-01

    Next to solar cells and solar collectors for decentralized power generation Concentrated Solar Power (CSP) technology is available and proven for large-scale application of solar energy. However, after 20 years of demonstration projects and semi-commercial installations, CSP is still not widely used. In this quick-scan an overview is given of strong and weak points of CSP, as well as its' options and constraints with regard to a sustainable energy supply, focusing on technical, economical and administrative constraints and chances in Europe and European Union member states [nl

  14. Testing and interfacing intelligent power supplies for the Los Alamos National Laboratory Accelerator Complex

    International Nuclear Information System (INIS)

    Sturrock, J.C.; Cohen, S.; Weintraub, B.L.; Hayden, D.J.; Archuleta, S.F.

    1992-01-01

    New high-current, high-precision microprocessor-controlled power supplies, built by Alpha Scientific Electronics of Hayward, CA, have been installed at the Los Alamos National Laboratory Accelerator Complex. Each unit has sophisticated microprocessor control on-board and communicates via RS-422 (serial communications). The units use a high level ASCII-based control protocol. Performance tests were conducted to verify adherence to specification and to ascertain ultimate long-term stability. The ''front-end'' software used by the accelerator control system has been written to accommodate these new devices. The supplies are interfaced to the control system through a terminal server port connected to the site-wide ediernet backbone. Test design and results as well as details of the software implementation for the analog and digital control of the supplies through the accelerator control system are presented

  15. 46 CFR 113.25-6 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.25-6 Section 113.25-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-6 Power supply. The emergency power source...

  16. 46 CFR 113.43-5 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.43-5 Section 113.43-5 Shipping COAST... SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-5 Power supply. Each steering failure alarm system must be supplied by a circuit that: (a) Is independent of other steering gear system and steering...

  17. Electric Power Supply Chain Management Addressing Climate Change

    DEFF Research Database (Denmark)

    Wang, Xiao-Hui; Cong, Ronggang

    2012-01-01

    Supply chain management played a critical role in the electric power industrial chain optimization. The purpose of this paper was to review a sample of the literature relating to supply chain management and its possible applications in electricity power system, especially in the context of climate...... change. The study compared the difference between electric power supply chain management and traditional supply chain management. Furthermore, some possible research topics are addressed. The aim of this paper was to promote the application of supply chain management in the China electricity sector...

  18. Design considerations for high current regulated DC power supplies with reference to 600 kW variable DC power supply

    International Nuclear Information System (INIS)

    Ushakumari; Garud, A.N.; Nadkarni, S.S.

    1980-01-01

    High current regulated dc power supplies find increasing applications in industry and research. The power rating of these supplies vary from few killowatts to megawatts. The general requirements of these supplies for various applications and the techniques used to achieve the desired performance are presented. The design and selection of various circuit blocks namely the rectifier transformer, multiphase rectifier arrangement, SCR paralleling and current sensing techniques, are discussed in detail for a 600 killowatt current controlled supply developed in the Bhabha Atomic Research Centre, Bombay, and used for the thermal studies of reactor components. The power supply incorporates paralleled phase controlled thyristors with a closed loop feedback circuitary to achieve a current stability of 0.1% and smooth output variation from 10 to 100%. (auth.)

  19. Efficient power supply using Power over Ethernet; Effiziente Stromversorgung mittels Power over Ethernet (PoE)

    Energy Technology Data Exchange (ETDEWEB)

    Huser, A.

    2005-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at methods of supplying small equipment such as Internet telephones, web cams, hubs, hard discs, audio equipment, point-of-sale terminals, game consoles etc. with power via their Ethernet connections. A short comparison is presented between Power over Ethernet (PoE) and other methods of supplying power along with data, including Universal Serial Bus (USB), FireWire and Powerline systems. The advantages of PoE over the use of separate power supply units are discussed and recommendations are made to the manufacturers and users of small peripheral equipment regarding the dimensioning and loading of such power supply systems.

  20. High stability, high current DC-power supplies

    International Nuclear Information System (INIS)

    Hosono, K.; Hatanaka, K.; Itahashi, T.

    1995-01-01

    Improvements of the power supplies and the control system of the AVF cyclotron which is used as an injector to the ring cyclotron and of the transport system to the ring cyclotron were done in order to get more high quality and more stable beam. The power supply of the main coil of the AVF cyclotron was exchanged to new one. The old DCCTs (zero-flux current transformers) used for the power supplies of the trim coils of the AVF cyclotron were changed to new DCCTs to get more stability. The potentiometers used for the reference voltages in the other power supplies of the AVF cyclotron and the transport system were changed to the temperature controlled DAC method for numerical-value settings. This paper presents the results of the improvements. (author)

  1. Power supply for magnetic coils in thermonuclear devices

    International Nuclear Information System (INIS)

    Shimada, Ryuichi; Tamura, Sanae; Kishimoto, Hiroshi.

    1981-01-01

    Purpose: To decrease the load fluctuations in an external power supply, as well as to increase the operation efficiency capacity of thermonuclear devices. Constitution: Electrical power with the same frequency as that of a dynamo generator is supplied by a power supply-driving power source including a frequency converter and the like to DC converters for driving plasma-exciting and -controlling coils. At the same time, the electrical power from the frequency converter is supplied to the dynamo generator with flywheel to add accumulate energies to the EC converters. Accordingly, the energy for the great power pulses in a short time comprises the sum of the energy supplied from the dynamo generator with flywheel and the energy supplied continuously from the outside to eliminate the need of providing a stand-by period for the re-acceleration of the dynamo generator with flywheel even if the scale of the thermonuclear device is enlarged and energy consumed in one cycle is increased, whereby the decrease in the operation efficiency can be prevented and the capacity of the flywheel can be reduced. (Yoshino, Y.)

  2. Spallation Neutron Source High Power RF Installation and Commissioning Progress

    CERN Document Server

    McCarthy, Michael P; Bradley, Joseph T; Fuja, Ray E; Gurd, Pamela; Hardek, Thomas; Kang, Yoon W; Rees, Daniel; Roybal, William; Young, Karen A

    2005-01-01

    The Spallation Neutron Source (SNS) linac will provide a 1 GeV proton beam for injection into the accumulator ring. In the normal conducting (NC) section of this linac, the Radio Frequency Quadupole (RFQ) and six drift tube linac (DTL) tanks are powered by seven 2.5 MW, 402.5 MHz klystrons and the four coupled cavity linac (CCL) cavities are powered by four 5.0 MW, 805 MHz klystrons. Eighty-one 550 kW, 805 MHz klystrons each drive a single cavity in the superconducting (SC) section of the linac. The high power radio frequency (HPRF) equipment was specified and procured by LANL and tested before delivery to ensure a smooth transition from installation to commissioning. Installation of RF equipment to support klystron operation in the 350-meter long klystron gallery started in June 2002. The final klystron was set in place in September 2004. Presently, all RF stations have been installed and high power testing has been completed. This paper reviews the progression of the installation and testing of the HPRF Sys...

  3. DC switch power supply for vacuum-arc coatings deposition

    International Nuclear Information System (INIS)

    Zalesskij, D.Yu.; Volkov, Yu.Ya.; Vasil'ev, V.V.; Kozhushko, V.V.; Luchaninov, A.A.; Strel'nitskij, V.E.

    2008-01-01

    Special DC Switch Power Supply for vacuum-arc deposition was developed and tested in the mode of depositing Al and AlN films. Maximum output power was 6 kW, maximum output current - 120 A, open-circuit voltage - 150 V. The Power Supply allows to adjust and stabilize output current in a wide range. Testing of the Power Supply revealed an advantages over the standard 'Bulat-6' power supply, especially for deposition of non-conductive AlN films.

  4. A multi-channel AC power supply controller

    International Nuclear Information System (INIS)

    Su Hong; Li Xiaogang; Ma Xiaoli; Zhou Bo; Yin Weiwei

    2003-01-01

    A multi-channel ac power supply controller developed recently by authors is introduced briefly in this paper. This controller is a computer controlled multi-electronic-switch device. This controller was developed for the automatic control and monitoring system of a 220 V ac power supply system, it is a key front-end device of the automatic control and monitoring system. There is an electronic switch in each channel, the rated load power is ≤1 kW/each channel. Another function is to sample the 220 V ac output voltage so that computer can monitor the operation state of each electronic switch. Through these switches, the 220 V ac power supply is applied to some device or apparatus that need to be powered by 220 V ac power supply. In the design, a solid-state relay was employed as an electronic switch. This controller can be connected in cascade mode. There are 8 boxes at most can be connected in cascade mode. The length of control word is 8 bit, which contains addressing information and electronic switch state setting information. The sampling output of the controller is multiplexed. It is only one bit that indicates the operating state of an electronic switch. This controller has been used in an automatic control and monitoring system for 220 V ac power supply system

  5. 47 CFR 80.965 - Reserve power supply.

    Science.gov (United States)

    2010-10-01

    ... conditions. When meeting this 2 hour requirement, such reserve power supply must be located on the bridge... radiotelephone must be a “reserve power supply” for the purposes of paragraphs (c), (d) and (e) of this section... meeting the requirements of paragraph (a) of this section as follows: (1) When the reserve power supply...

  6. The hidden costs of installing Xpert machines in a tuberculosis high-burden country: experiences from Nigeria.

    Science.gov (United States)

    Abdurrahman, Saddiq Tsimiri; Emenyonu, Nnamdi; Obasanya, Olusegun Joshua; Lawson, Lovett; Dacombe, Russell; Muhammad, Muhammad; Oladimeji, Olanrewaju; Cuevas, Luis Eduardo

    2014-01-01

    Since the endorsement of GeneXpert MTB/RIF by the WHO, many countries have embarked on implementing this technology. We outline the cost of installing GeneXpert in district hospitals in Abuja, Nigeria. We prospectively documented costs related to the installation of GeneXpert at five sites. Costs were collected from receipts received from suppliers and normalized to USD 2012 values. Costs were often identified after initiating installation for many reasons. Installation varied widely between sites with sufficient space and power supply; sites with insufficient space or power supply and costs not directly associated with site installation. The basic cost for installation was USD 2,621.98 per machine. Sites that required additional space cost close to USD 7,000.00. Space and power requirements have a significant effect on installation costs. Countries need to carefully consider the placement of Xpert machines based on the quality and size of the available infrastructure.

  7. Preferred external power supplies; Fuentes electricas preferentes exteriores

    Energy Technology Data Exchange (ETDEWEB)

    Martinez Anton, L.

    2010-07-01

    In June 2008 ANAV and ENDESA DISTRIBUCION (EDE) undertook a joint study of Asco NPP Preferred External Power Supplies (PEPSs) to check the number of lines or power supplies to the 110 kV substation at Asco that met the criteria defined in the power supply regulations applicable to Asco NPP and primarily to confirm compliance with IEEE 765-2006 standard. (Author).

  8. Design and development of power supplies for high power IOT based RF amplifier

    International Nuclear Information System (INIS)

    Kumar, Yashwant; Kumari, S.; Ghosh, M.K.; Bera, A.; Sadhukhan, A.; Pal, S.S.; Khare, V.K.; Tiwari, T.P.; Thakur, S.K.; Saha, S.

    2013-01-01

    Design, development, circuit topology, function of system components and key system specifications of different power supplies for biasing electrodes of Thales Inductive Output Tube (IOT) based high power RF amplifier are presented in this paper. A high voltage power supply (-30 kV, 3.2A dc) with fast (∼microsecond) crowbar protection circuit is designed, developed and commissioned at VECC for testing the complete setup. Other power supplies for biasing grid electrode (300V, 0.5A dc) and Ion Pump (3 kV, 0.1mA dc) of IOT are also designed, developed and tested with actual load. A HV Deck (60kV Isolation) is specially designed in house to place these power supplies which are floating at 30 kV. All these power supplies are powered by an Isolation Transformer (5 kVA, 60 kV isolation) designed and developed in VECC. (author)

  9. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.680 Installation of wiring for power...

  10. Circuit design and simulation of a HV-supply controlling the power of 140 GHz 1 MW gyrotrons for ECRH on W7-X

    International Nuclear Information System (INIS)

    Brand, P.; Mueller, G.A.

    2003-01-01

    For plasma heating by ECR in the Stellarator W7-X under construction, 140 GHz gyrotrons with 1 MW cw output power are under development. These tubes have a voltage depressed collector for electron energy recovery. Each gyrotron is fed by two high-voltage sources: a high-power supply for driving the electron beam and a precision low-power supply for beam acceleration. In addition, a protection system with a thyratron crowbar for fast power removal in case of gyrotron arcing is installed. The low-power high-voltage source for beam acceleration is realized by a high-voltage servo-amplifier driving the depression voltage such that the influence of the voltage noise of the main high-power supply on the acceleration voltage is suppressed by feed-back control of the amplifier. Design and simulation of the servo-amplifier by PSpice is presented

  11. Research tokamak system with multi-mode discharges using inverter power supply

    International Nuclear Information System (INIS)

    Kojima, Hiroki; Kobayashi, Masahiro; Takagi, Makoto; Takamura, Shuichi; Tashiro, Kenji

    1999-01-01

    In Current Sustaining Tokamak in Nagoya university (CSTN)-IV research tokamak system using a compact 40kHz pulse width modulation (PWM) inverter power supply, which is controlled through LabVIEW program, we construct a new tokamak discharge system with multi-mode including a stable alternating current discharge and a high-repetition high-duty one. These discharge modes can be operated continuously for as long as 60sec. The continuous discharge with long duration is able to simulate the important physical and chemical processes of long time discharges in fusion devices, in which the heat load to the wall and the particle balance in the plasma-wall system are crucial topics in order to realize a long pulse fusion reactor, like ITER. Employing ergodic divertor (ED) is one of tools to control the particle balance and the heat load to the wall. In addition, we installed another inverter power supply to generate a rotating magnetic perturbation for dynamic ergodic divertor (DED) with the appropriate measurement system so that we may carry out experiments on heat and particle control with DED at long time operation. (author)

  12. Emergency power supply with batteries. Notstromversorgung mit Batterien

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    This conference volume contains the wording of the following 16 papers given at the symposium: ''Stationary Pb batteries''; ''maintenance-free Pb batteries with antimony-free grid plates or tube plates and dry fit system''; ''stationary alkali, Ag/Zc and gas-tight Ni/Cd batteries''; ''modern Li systems''; ''high-temperature batteries''; ''primary and secondary metal-air cells''; ''peak-load coverage with Pb batteries in distribution networks and industrial plants''; ''Success and problems with national and international standardization''; ''electronic monitoring of batteries'', ''up-to-date charging and converter technology''; ''versatile emergency power supply with the Federal German Railways''; ''emergency lighting''; ''emergency power supply in large-scale industrial plants''; ''battery power supply with the Federal German Post and Telecommunications''; ''Power supply to modern communication facilities''; ''modular d.-c. converter''; ''back-up power supply in the military field''; and it contains the wording of the discussions following the papers.

  13. Temperature Stabilized Characterization of High Voltage Power Supplies

    CERN Document Server

    Krarup, Ole

    2017-01-01

    High precision measurements of the masses of nuclear ions in the ISOLTRAP experiment relies on an MR-ToF. A major source of noise and drift is the instability of the high voltage power supplies employed. Electrical noise and temperature changes can broaden peaks in time-of-flight spectra and shift the position of peaks between runs. In this report we investigate how the noise and drift of high-voltage power supplies can be characterized. Results indicate that analog power supplies generally have better relative stability than digitally controlled ones, and that the high temperature coefficients of all power supplies merit efforts to stabilize them.

  14. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  15. First commercial fuel cells in emergency power supplies; Erste kommerzielle Brennstoffzellen im Notstrombereich. Praxistest als USV fuer eine Mobilfunkbasisstation

    Energy Technology Data Exchange (ETDEWEB)

    Trachte, U.

    2008-07-01

    This article takes a look at the testing of a fuel-cell-based uninterruptible power supply for a cell-phone base station. The working principles of various types of fuel cell are examined and their areas of application are discussed. The use of polymer-electrolyte-membrane (PEM) fuel cells as a back-up power supply for a cell-phone base station was examined by the University of Applied Sciences in Lucerne, Switzerland. Several designs and models of fuel cells were examined. The installation of the cell-phone station is described and experience gained from the use of fuel cells in practice is presented and discussed.

  16. Power facility plan and power supply plan of Japan in 1988

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, Shoji; Makino, Masao

    1988-06-01

    The power facility plan and the power supply plan for 1988 are described. The demand by non-industrial use will grow at an average of 3.8% for the 1986-97 period due to changes in the life style, construction and extension of buildings and increasing use of OA equipment although the power conservation is promoted. The industrial consumption will increase at only 1.2% a year due to the slowed growth and energy saving. As a result, the total demand will be 778,200 million kWh in 1997 with annual growth of 2.4%. The maximum demand will be 151,210 kW in 1997 with annual growth of 2.9%. The annual load rate will decrease to 56.9%, showing a continuously worsening utilization efficiency of power facilities. The development of 29 power units with total capacity of 2,760 MW is planned in 1988 for a stable power supply with a sufficient margin regarding maximum demand. The plan requires the investment of 3,700 billion yen, including the power transmission systems and substations. The power supply plan in 1988 is aimed at the effective operation of facilities and cost reduction by regional management under proper recognition of local characteristics of each power source, while maintaining a stable power supply with specified margins. (1 fig, 11 tabs)

  17. Resonance power supplies for large accelerator

    International Nuclear Information System (INIS)

    Karady, G.; Schneider, E.J.

    1993-01-01

    The resonance power supply has been proposed as an efficient power supply for a future 6 GB, keon producing accelerator. This report presents a detailed analysis of the circuit operation. Based on these analyses each component is designed, one line diagram is developed, component requirements are determined and a detailed cost estimate is prepared. The major components of the system are: the magnet power supply, high voltage by-pass thyristor switch, with l0kA repetitive interruption capability, capacitor banks, capacitor bank thyristor switch, and an energy make up device. The most important components are the bypass thyristor switch and the energy injection device. The bypass thyristor switch is designed to turn on and interrupt to 10 kA dc current with a recovery voltage of 20kV and repetition frequency of 3 Hz. The switch consists of a large array of series and parallel connected thyristors and gate turn off (GTO) devices. The make up energy device is designed to replace the circuit energy losses. A capacitor bank is charged with constant current and discharged during the acceleration period. One of the advantages of the developed circuit is that it can be supplied directly from the local power network. In order to prove the validity of the assumptions, a scaled down model circuit was thoroughly tested. These tests proved that the engineering design of critical components is correct and this resonant power supply can be properly controlled by an inventer/rectifier connected in series with the magnet and by the make up energy device. This finding reduces the system cost

  18. Power supply and environment protection

    International Nuclear Information System (INIS)

    Tettinger, P.J.; Filipek, J.; Jendroska, J.

    1992-01-01

    The 16 lectures by German and Polish scientists have all been entered into the data base. They deal among other things with the common market for power and the constraints placed on it by EC law; local power supply in the Federal German Republic; intercommunal cooperation for satisfying local power demand; public participation in power law; ways of accelerating procedures etc. (HSCH) [de

  19. Discontinuous Mode Power Supply

    Science.gov (United States)

    Lagadinos, John; Poulos, Ethel

    2012-01-01

    A document discusses the changes made to a standard push-pull inverter circuit to avoid saturation effects in the main inverter power supply. Typically, in a standard push-pull arrangement, the unsymmetrical primary excitation causes variations in the volt second integral of each half of the excitation cycle that could lead to the establishment of DC flux density in the magnetic core, which could eventually cause saturation of the main inverter transformer. The relocation of the filter reactor normally placed across the output of the power supply solves this problem. The filter reactor was placed in series with the primary circuit of the main inverter transformer, and is presented as impedance against the sudden changes on the input current. The reactor averaged the input current in the primary circuit, avoiding saturation of the main inverter transformer. Since the implementation of the described change, the above problem has not reoccurred, and failures in the main power transistors have been avoided.

  20. Systems approach to design of power supply to mines

    Energy Technology Data Exchange (ETDEWEB)

    Shul' ga, Yu I; Voloshko, A V

    1986-09-01

    Optimization of power supplies to underground coal mines in the USSR is evaluated. Systems analysis of power systems is discussed. Power system of a coal mine is treated as an element of the branch power system which forms a subsystem of the local and national power system. Design of a system for computerized control of power supplies to underground coal mines is evaluated. Elements of the system, control equipment, types of information stored and processed by the system as well as economic efficiency of using computerized control for power supply in underground mining are discussed. Recommendations for computer-aided design of power systems and use of computerized control systems for power supply in underground coal mining in the USSR are made.

  1. Economics of PV power supply for Libyan remote areas

    International Nuclear Information System (INIS)

    La-azebi, I.F.; Kagilik, A.S.; Bara, M.F.

    2000-01-01

    The electrical power supplies of remote and isolated areas has been and is still an issue for electric power companies worldwide. Usually there are three ways of supplying these remote areas mainly, the general grid, the Diesel generators, and photovoltaic power supply. The use of one of these systems instead of the other depend, on the availability, reliability, and cost. There are some isolated areas, which can t be supplied from the general grid as they are far away from it and economically not visible, so the electric power is needed of such isolated areas will be supplied either by Diesel generators or photovoltaics. The use of diesel generator demands a constant fuel supply, and maintenance staff, which also may not be available in small villages. Therefore the PV generators in such cases are considered an ideal solution of supplying these areas. In Libya, a national program has been started to supply small villages and other loads in remote and isolated areas, with electricity using PV power supply. This paper presents an economical comparison between the two different alternatives of electric supply systems to be used in remote areas: Diesel generators and PV systems. (Author)

  2. SNS EXTRACTION KICKER POWER SUPPLY PROTOTYPE TEST

    International Nuclear Information System (INIS)

    MI, J.L.; SANDBERG, J.; SANDERS, R.; SOUKAS, A.; ZHANG, W.

    2000-01-01

    The SNS (Spallation Neutron Source) accumulator ring Extraction System consists of a Fast kicker and a Lambertson Septum magnet. The proposed design will use 14 kicker magnets powered by an Extraction Kicker Power Supply System. They will eject the high power beam from the SNS accumulator ring into RTBT (Ring to Target Beam Tunnel) through a Lambertson Septum magnet. This paper describes some test results of the SNS Extraction Kicker power supply prototype. The high repetition rate of 60 pulse per second operation is the challenging part of the design. In the prototype testing, a 3 kA damp current of 700ns pulse-width, 200 nS rise time and 60 Hz repetition rate at 32 kV PFN operation voltage has been demonstrated. An Extraction kicker power supply system design diagram is depicted

  3. Tetrode bias power supply for Indus-1, synchrotron radiation source

    International Nuclear Information System (INIS)

    Tripathi, A.; Badapanda, M.K.; Tyagi, R.; Upadhyay, R.; Bohrey, A.; Hannurkar, P.R.

    2009-01-01

    An AC regulator based 7 kV, 3 A high voltage DC power supply is designed, fabricated and tested on dummy load for BEL make Tetrode type 15000CX, used in the high power RF amplifier at 31.613 MHz employed with INDUS-1, Synchrotron Radiation Source (SRS). Various protections features like over voltage, under voltage, over current, phase failure and phase reversal are incorporated in this power supply and presented in this paper. As Tetrode amplifier requires various other power supplies in addition to this bias power supply and they are operated in a particular sequence for its healthy operation, suitable interlock arrangements have been incorporated and also presented in this paper. The reliable operation of protection and interlock features incorporated in this power supply has been checked with dummy load under simulated conditions. Three numbers of series limiting inductors, one in each phase, have been incorporated in this power supply to limit fault currents under unfavourable conditions and there by increasing the overall life of this power supply. It will replace existing 7 kV, 3 A HVDC power supply, which is in operation for more than fifteen years with Indus-1 SRS and is likely to be helpful in reducing the down time of Indus-1 SRS. It has better performance features than the existing power supply. The long term voltage stability better than 0.3 % and output ripple less than 0.3 % have been achieved for this Tetrode bias power supply. This power supply is likely to be integrated with INDUS-1 SRS soon. (author)

  4. Study: control of atomic energy power plant; Etude de la regulation d'une installation atomique productrice d'energie

    Energy Technology Data Exchange (ETDEWEB)

    Dautray, R; Leny, J C [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1958-07-01

    We are studying the control of a very flexible atomic power plant, able to supply an independent network. Two systems have been examined: in the first the moderator pre-heats the light water, in the second, this preheating is dispensed with, subsequent to a study of the dynamics of the plant. Very complete linear approximation study is being effected on the model of the second system, all effects being taken into account. The reactor is stable at all power levels, though slight reactivity or load variations cause undamped power oscillations around the equilibrium level. (author)Fren. [French] Nous etudions la regulation d'une installation atomique d'une grande souplesse, pouvant eventuellement fournir de l'energie a un reseau isole. Deux versions de l'installation sont etudiees: dans la premiere le moderateur sert a rechauffer l'eau industrielle, mais l'etude dynamique conduit a supprimer ce rechauffage, ce qui donne la deuxieme version. On effectue sur celle-ci une etude en approximation lineaire tres complete ou l'on tient compte de differents effets. L'installation se montre stable a tous les niveaux de puissance. Toutefois, de petites perturbations de reactivite ou de charge entrainent des oscillations de puissance mal amorties autour de la position d'equilibre. (auteur)

  5. Engineering Design of the ITER AC/DC Power Supplies

    International Nuclear Information System (INIS)

    Oh, B. H.; Lee, K. W.; Hwang, C. K.; Jin, J. T.; Chang, D. S.; Kim, T. S.

    2009-02-01

    To design high power pulse power supplies, especially in huge power supplies have not designed till now, it is necessary to analyze a system's characteristics and relations with another systems as well as to know high voltage, high current control technologies. Contents of this project are; - Study for the engineering designs changed recently by ITER Organization(IO) and writing specifications for the power supplies to reduce project risk. - Detailed analysis of the AC/DC Converters and writing subtask reports on the Task Agreement. - Study for thyristor numbers, DCR's specifications for Korea-China sharing meetings. - Study for the grounding systems of the ITER power supply system. The results may used as one of reference for practical designs of the high power coil power supplies and also may used in various field such as electroplating, plasma arc furnaces, electric furnaces

  6. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  7. Electric power supply in China. Pt. 1

    International Nuclear Information System (INIS)

    Chen Heng

    1987-01-01

    Professor Chen, visiting professor at the RWTH Aachen, gave several lectures dealing with his country, the electric power supply in China and with special research activities of Chinese scientists. This article is based on two of his lectures, and will be published in two parts, the first of which provides a brief description of China, an overview on electric power supply, and a brief description of the large power plants and large electrical subsystems. The second part will deal with operation planning, extension planning as well as with research and development in the field of electric energy supply. (orig.) [de

  8. Troubleshooting of signal power supply system for Shanghai metro line 7

    Science.gov (United States)

    Lu, Kaixia; Xiao, Jie

    2018-03-01

    With the rapid development of Urban Rail Transit Signal Technology, the demand of signal power supply system for signal equipment is higher and higher. The signal intelligent power supply panel is the main component of the urban rail traffic signal power supply system. Whether the intelligent power supply panel working or not is directly related to traffic safety. The maintenance of intelligent signal power supply panel is particularly important. Line 7 of Shanghai Metro adopts PMZG Signal Intelligent Power Supply Panel, which is produced by Beijing Jinyujiaxin Polytron Technologies Inc. Maintenance of power supply system mainly includes routine maintenance and troubleshooting. This article will make clear the routine maintenance contents of PMZG Signal Intelligent Power Supply Panel, and put forward the common fault information and troubleshooting methods of PMZG Signal Intelligent Power Supply Panel. In accordance with the steps of fault handling, the faults can be eliminated in the shortest possible time, and PMZG Signal Intelligent Power Supply Panel can be quickly restored to normal working state.

  9. Improving Power Quality in AC Supply Grids

    Directory of Open Access Journals (Sweden)

    Piotr Fabijański

    2015-12-01

    Full Text Available This paper describes a digital and actual model of the UPQC (Unified Power Quality Conditioner integrated system for power quality improvement. The UPQC’s design and its connection to an AC supply grid, 1-phase and 3-phase alike, provide effective compensation of unwanted interferences in the waveforms of load supply voltages and non-linear load currents. This article presents an overview of topologies and control strategies. The study of the UPQC confirmed its positive impact on the power quality. The electricity parameters were significantly improved. Total harmonic distortion in supply voltage THDu decreased six-fold to 1.89%, and total harmonic distortion in load current THDi decreased more than ten-fold to 2.38% for a non-linear load (uncontrolled bridge rectifier with load L. Additionally, symmetrisation of supply voltages and reactive power compensation Q of linear load was obtained. The UPQC integrated system for power quality improvement can be used wherever high-quality and PN-EN 50160 standard – compliant electricity is required.

  10. Advanced buck converter power supply ABCPS for APT

    International Nuclear Information System (INIS)

    Street, R.; Overett, T.; Bowles, E.

    1998-01-01

    The United States Department of Energy (DOE) is planning to fabricate an Accelerator for the Production of Tritium (APT) at their Savannah River Site, to provide Tritium for national defense. The 1700 million electron volt (MeV) proton beam accelerator will be powered by radio frequency (RF) klystrons. A direct current (DC) power supply is required for each of the approximately two hundred and fifty 1-megawatt (MW) continuous wave klystrons in the RF power system. The requirements are that the power supply meet output performance specifications, provide fault protection for the klystron, have high efficiency, high reliability, good maintainability, and be readily manufacturable. As the power supplies are one of the largest cost elements in the accelerator, a technology review was made to determine the most economical approach to satisfy the requirements. A switch-mode power supply employing a buck-regulator was identified as being potentially the lowest cost approach. As the switch represents a certain development risk, a small-scale prototype has been constructed for evaluation, and has resulted in the decision to fabricate a full-scale prototype power supply. A description of the hardware will be presented

  11. The future of electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    In this interview with a prominent expert of the electric power industry, problems of assuring electricity supply, the economics of nuclear electricity generation, the supply structure, and cogeneration are discussed. (UA) [de

  12. Design and development of power supplies at VECC for accelerators

    International Nuclear Information System (INIS)

    Thakur, S.K.

    2013-01-01

    Several power supplies have been designed and developed in-house incorporating various topologies to match the load requirements. Most of the power supplies have been being utilised in K-130 and K-500 cyclotrons operation successfully from last several years. Amongst other types, Switching Mode PS (SMPS), Phase Controlled Rectifier (PCR), Linear mode power supply are mostly in use, irrespective of their own merits and demerits. Switching mode power supply (SMPS) is most common topology for various applications ranging from high current to high voltage applications. Due to low stored energy and faster response, the SMPS incorporating Pulse Switch Modulation (PSM) configuration is most suitable for high voltage DC power supply at larger power compared to its counterparts, makes possible to operate the power system without crowbar. For an IOT cathode power supply, a 200kW at - 40kV High voltage power supply is under development incorporating SMPS and PSM technique. Earlier, High Voltage power supply was made by using Tetrode Tube in linear mode for RF amplifier for K-130 Cyclotron. Later, in K-500 Cyclotron, a High Voltage power supply was developed incorporating PCR topology rated at 20kV, 20 Amp for Anodes for 3 nos. of RF amplifiers. These HV power supply is equipped with ultra-fast acting Crowbar Protection System developed in VECC which is for the protection of costly RF Tubes against the internal arc. Design and development of SMPS based Bipolar Power Supply with 4-Quadrant operation rated at ± 27 V, ± 300 Amp with current stability around 100 ppm for Super-conducting Magnets along with quench protection and energy dumping scheme. (author)

  13. Booster main magnet power supply, present operation and potential future upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Bajon, E.; Bannon, M.; Marneris, I.; Danowski, G.; Sandberg, J.; Savatteri, S.

    2011-03-28

    The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

  14. High voltage power supplies for INDUS-2 RF system

    International Nuclear Information System (INIS)

    Badapanda, M.K.; Hannurkar, P.R.

    2003-01-01

    The RF system of Indus-2 employs klystron amplifiers operating at 505.812 MHz. A precession controlled high voltage DC supply of appropriate rating is needed for each klystron amplifier, as its bias supply. Since internal flashover and arcing are common with the operation of these klystrons and stored energies beyond particular limit inside its bias power supply is detrimental to this device, a properly designed crowbar is incorporated between each klystron and its power supply. This crowbar bypass these stored energies and helps protecting klystron under any of these unfavorable conditions. In either case, power supply sees a near short circuit across its load. So, its power circuit is designed to reduce the fault current level and its various components are also designed to withstand these fault currents, as and when it appears. Finally, operation of these high voltage power supplies (HVPS) generates lot of harmonics on the source side, which distort the input waveform substantially and reduces the input power factor also. Source multiplication between two power supplies are planned to improve upon above parameters and suitable detuned line filters are incorporated to keep the input voltage total harmonics distortion (THD) below 5 % and input power factor (IFF) near unity. (author)

  15. Design, manufacture and factory testing of the Ion Source and Extraction Power Supplies for the SPIDER experiment

    International Nuclear Information System (INIS)

    Bigi, Marco; Rinaldi, Luigi; Simon, Muriel; Sita, Luca; Taddia, Giuseppe; Carrozza, Saverino; Decamps, Hans; Luchetta, Adriano; Meddour, Abdelraouf; Moressa, Modesto; Morri, Cristiano; Musile Tanzi, Antonio; Recchia, Mauro; Wagner, Uwe; Zamengo, Andrea; Toigo, Vanni

    2015-01-01

    Highlights: • 5 MVA ion source power supplies effectively integrated in 150 m"2 Faraday cage. • Load protection and performance requirements met of custom design high voltage power supplies. • 200 kW tetrode oscillator with 200 kHz frequency range successfully tested. - Abstract: The SPIDER experiment, currently under construction at the Neutral Beam Test Facility in Padua, Italy, is a full-size prototype of the ion source for the ITER Neutral Beam Injectors. The Ion Source and Extraction Power Supplies (ISEPS) for SPIDER are supplied by OCEM Energy Technology s.r.l. (OCEM) under a procurement contract with Fusion for Energy (F4E) covering also the units required for MITICA and ITER injectors. The detailed design of SPIDER ISEPS was finalized in 2011 and manufacture of most components completed by end 2013. The Factory Acceptance Tests took place early 2014. ISEPS, with an overall power rating of 5 MVA, form a heterogeneous set of items including solid state power converters and 1 MHz radiofrequency generators of 200 kW output power. The paper presents the main features of the detailed design developed by OCEM, focusing in particular on the high output voltage pulse step modulators, the high output current resonant converters, the radiofrequency generators by HIMMELWERK GmbH and the architecture and implementation of the complex control system. Details are given on non-standard factory tests verifying the insulation requirements specific to this application. Performance of ISEPS during the factory acceptance tests is described, with emphasis on demonstration of the load protection requirements, a crucial point for all neutral beam power supplies. Finally, key dates of SPIDER ISEPS installation and site testing schedule are provided.

  16. Design, manufacture and factory testing of the Ion Source and Extraction Power Supplies for the SPIDER experiment

    Energy Technology Data Exchange (ETDEWEB)

    Bigi, Marco, E-mail: marco.bigi@igi.cnr.it [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Rinaldi, Luigi [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Simon, Muriel [Fusion for Energy, Josep Pla 2, 08019 Barcelona (Spain); Sita, Luca; Taddia, Giuseppe; Carrozza, Saverino [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Decamps, Hans [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul lez Durance (France); Luchetta, Adriano [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Meddour, Abdelraouf [HIMMELWERK Hoch- und Mittelfrequenzanlagen GmbH, Jopestr. 10, 72072 Tübingen (Germany); Moressa, Modesto [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Morri, Cristiano; Musile Tanzi, Antonio [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Recchia, Mauro [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Wagner, Uwe [HIMMELWERK Hoch- und Mittelfrequenzanlagen GmbH, Jopestr. 10, 72072 Tübingen (Germany); Zamengo, Andrea; Toigo, Vanni [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy)

    2015-10-15

    Highlights: • 5 MVA ion source power supplies effectively integrated in 150 m{sup 2} Faraday cage. • Load protection and performance requirements met of custom design high voltage power supplies. • 200 kW tetrode oscillator with 200 kHz frequency range successfully tested. - Abstract: The SPIDER experiment, currently under construction at the Neutral Beam Test Facility in Padua, Italy, is a full-size prototype of the ion source for the ITER Neutral Beam Injectors. The Ion Source and Extraction Power Supplies (ISEPS) for SPIDER are supplied by OCEM Energy Technology s.r.l. (OCEM) under a procurement contract with Fusion for Energy (F4E) covering also the units required for MITICA and ITER injectors. The detailed design of SPIDER ISEPS was finalized in 2011 and manufacture of most components completed by end 2013. The Factory Acceptance Tests took place early 2014. ISEPS, with an overall power rating of 5 MVA, form a heterogeneous set of items including solid state power converters and 1 MHz radiofrequency generators of 200 kW output power. The paper presents the main features of the detailed design developed by OCEM, focusing in particular on the high output voltage pulse step modulators, the high output current resonant converters, the radiofrequency generators by HIMMELWERK GmbH and the architecture and implementation of the complex control system. Details are given on non-standard factory tests verifying the insulation requirements specific to this application. Performance of ISEPS during the factory acceptance tests is described, with emphasis on demonstration of the load protection requirements, a crucial point for all neutral beam power supplies. Finally, key dates of SPIDER ISEPS installation and site testing schedule are provided.

  17. Protection of the MFTF accel power supplies

    International Nuclear Information System (INIS)

    Wilson, J.H.; Wood, J.C.

    1979-01-01

    The MFTF experiment's Sustaining Neutral Beam Power Supply System (SNBPSS) includes twenty-four 95 kV, 80 A accel dc power supplies (ADCPS). Each power supply includes a relatively high-impedance (20 percent) rectifier transformer and a step voltage regulator with a 50-100 percent voltage range. With this combination, the fault current for some postulated faults may be lower than the supply's full load current at maximum voltage. A design has been developed which uses protective relays and current-limiting fuses coordinated to detect phase and ground faults, DC faults, incorrect voltage conditions, rectifier faults, power factor correction capacitor faults, and overloads. This unusual solution ensures fast tripping on potentially destructive high-current faults and long-time delays at lower currents to allow 30 second pulse operation. The ADCPS meets the LLL specification that all major assemblies be self-protecting, that is, able to sustain external faults without damage to minimize damage due to internal faults

  18. Power supply in future: ecological aspects

    International Nuclear Information System (INIS)

    Hustedt, M.

    2000-01-01

    The most important prerequisites for an ecological supply of energy in the future is the opting out of nuclear energy and the completion of the second and third phase of the socio-ecological tax reform. As a part of our energy will continue to be generated on the basis of fossil fuels in the foreseeable future, it is essential that a radical change takes place in the efficiency of fossil energy engineering. In addition to this, any possible energy-saving potential must be exploited; this includes the new energy-saving law, promoting the modernisation of old buildings and modern energy management (heat insulation, heating engineering, warm water heating etc.). For an ecological power supply the share of renewable energies must be increased to form a major pillar of our power supply. The '100,000-roof' programme of the German federal government and the development programme for near-market renewable energy sources form part of this approach. Energy research should shift its orientation and accelerate the conversion of our power supply: priority should be given to developing energy-saving technologies and renewable energy. Supporting municipalities and public utilities is especially important. This means revising the basic conditions of energy laws so that they assist public utilities to face competition as power utilities. (orig.) [de

  19. Proposal to negotiate a contract, without competitive tendering, for the supply and installation of pipework for the new hostel

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate a contract for the supply and installation of new piping as preparatory work for the construction of a third on-site hostel. For the reasons explained in this document, the Finance Committee is invited to approve a contract with the SERVICES INDUSTRIELS DE GENEVE (SIG) (CH), without competitive tendering, for the supply and installation of new piping for an amount not exceeding 700 000 Swiss francs, not subject to revision.

  20. Geodetic alignment of laser power installations

    International Nuclear Information System (INIS)

    Shtorm, V.V.; Gostev, A.M.; Drobikov, A.V.

    1989-01-01

    Main problems occuring in applied geodesy under initial alignment of laser power installation optical channel are considered. Attention is paid to alignment of lens beamguide telescopic pairs and alignment quality control. Methods and means of geodetic measurements under alignment are indicated. Conclusions are made about the degree of working through certain aspects of the problem

  1. Development of Discrete Power Supply with Charge Pump Method for High Powered Sonar System

    Directory of Open Access Journals (Sweden)

    Kristian Ismail

    2012-07-01

    Full Text Available Power supply is one of the electronic devices that can provide electric energy for electronic systems or other systems. There are several types of power supplies that can be applied depend on the requirement and functions. One example is the use of power supply for sonar systems. Sonar system is a device which can be used to detect a target under water. The sonar system is an electronic circuit that requires a power supply with specific characteristics when the sonar functions as a transmitter and a receiver in the specific span time (when on and the specific lag time (when off. This paper discusses the design of power supply for high-powered sonar systems with discrete methods in which high power supply is only applied when the acoustic waves radiated under water. Charge pump was used to get the appropriate output voltage from lower input voltage. Charge pump utilized a combination of series and parallel connections of capacitors. The working mode of this power supply used the lag time as the calculation of time to charge charge pump capacitors in parallel while the span time was used for the calculation of discharging the charge pump capacitors in series.

  2. Control of the superconducting magnet power supply for SECRAL

    International Nuclear Information System (INIS)

    Zhou Wenxiong; Wang Yanyu; Zhou Detai; Lu Wang; Feng Yucheng; Su Jianjun

    2014-01-01

    The control of the superconducting magnet power supply (SMPS) is very important for Superconducting Electron Cyclotron Resonance Ion source with Advanced design in Lanzhou (SECRAL). In order to improve the safety and the reliability of the SMPS, a remote control system was designed and implemented. There are four power supplies needed to be controlled with suitable strategy to avoid the quench of the superconducting magnet. These four power supplies are used to supply four superconducting solenoids. Because the value and the changing rates of the current for these four solenoids are different, the power supplies must be operated synchronously to keep the current of the solenoids balanced. In this paper, we provide a detailed description for the control strategy of the four power supplies and the architecture of the hardware and the software. A serial switch is used for protocol conversion between TCP/IP and RS232 in firmware. And the software is implemented using VC++. The system can operate the four power supplies automatically after it is triggered. With the help of the control system, operation of the SMPS gets easier and safer. (authors)

  3. Power enhancement of piezoelectric transformers for power supplies

    DEFF Research Database (Denmark)

    Ekhtiari, Marzieh; Steenstrup, Anders Resen; Zhang, Zhe

    2016-01-01

    This paper studies power enhancement of piezoelectric transformers to be used in inductorless, half-bridge, piezoelecteric-based switch mode power supplies for driving a piezo actuator motor system in a high strength magnetic environment for magnetic resonance imaging and computed tomography...... applications. A new multi element-piezo transformer solution is proposed along with a dual mode piezo transformer, providing power scaling and potentially improving the internal heat-up of a high power piezo transformer system....

  4. Optimized control strategy for crowbarless solid state modular power supply

    International Nuclear Information System (INIS)

    Upadhyay, R.; Badapanda, M.K.; Tripathi, A.; Hannurkar, P.R.; Pithawa, C.K.

    2009-01-01

    Solid state modular power supply with series connected IGBT based power modules have been employed as high voltage bias power supply of klystron amplifier. Auxiliary compensation of full wave inverter bridge with ZVS/ZCS operations of all IGBTs over entire operating range is incorporated. An optimized control strategy has been adopted for this power supply needing no output filter, making this scheme crowbarless and is presented in this paper. DSP based fully digital control with same duty cycle for all power modules, have been incorporated for regulating this power supply along with adequate protection features. Input to this power supply is taken directly from 11 kV line and the input system is intentionally made 24 pulsed to reduce the input harmonics, improve the input power factor significantly, there by requiring no line filters. Various steps have been taken to increase the efficiency of major subsystems, so as to improve the overall efficiency of this power supply significantly. (author)

  5. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  6. ISABELLE magnet power supply system performance analysis

    International Nuclear Information System (INIS)

    Edwards, R.J.

    1981-01-01

    The power supply system that will energize the superconducting magnets in the ISABELLE 400 x 400 GeV accelerator must supply various voltages and currents. The voltages for the correction winding range from ten to one hundred twenty-five volts unipolar and bipolar with current rating of 50 to 300 amperes. The main field winding requires voltages from 90V (at flattop) to 600V during maximum ramp rate or acceleration cycle. The power supplies are programmable over their full range of output current with a reproducibility error varying from +- 10 ppM to +- 400 ppM of full scale. Included within the reproducibility error are the long and short term stability requirements of the power supplies. The purpose of this paper is to define some of the design goals and outline the approach taken in reaching these goals

  7. The upgraded PSI application in the BEPCⅡ power supply control system

    International Nuclear Information System (INIS)

    Li Jiangqi; Wang Xiaoli; Wang Chunhong; Liu Jia

    2011-01-01

    There are about 460 magnet power supplies in the two rings and the transport lines of the BEPCⅡ which are controlled by the power supply controller and the power supply interface. An upgraded Power Supply Interface (PSI-Ⅱ) was developed for replacing the old one in the power supply control system of the BEPCⅡ. It will firstly describe feature of the PSI-Ⅱ and difference from the PSI. Then, discuss performance test of the PSI-Ⅱ well as its application in the power supply control system. (authors)

  8. Dependence and power in healthcare equipment supply chains.

    Science.gov (United States)

    de Jong, Jurriaan L; Benton, W C

    2018-03-05

    Most healthcare organizations (HCOs) engage Group Purchasing Organizations (GPOs) as an outsourcing strategy to secure their supplies and materials. When an HCO outsources the procurement function to a GPO, this GPO will directly interact with the HCO's supplier on the HCO's behalf. This study investigates how an HCO's dependence on a GPO affects supply chain relationships and power in the healthcare medical equipment supply chain. Hypotheses are tested through factor analysis and structural equation modeling, using primary survey data from HCO procurement managers. An HCO's dependence on a GPO is found to be positively associated with a GPO's reliance on mediated power, but, surprisingly, negatively associated with a GPO's mediated power. Furthermore, analysis indicates that an HCO's dependence on a GPO is positively associated with an HCO's dependence on a GPO-contracted Original Equipment Manufacturer (OEM). HCO reliance on GPOs may lead to a buyer's dependence trap, where HCOs are increasingly dependent on GPOs and OEMs. Implications for HCO procurement managers and recommended steps for mitigation are offered. Power-dependence relationships in the medical equipment supply chain are not consistent with relationships in other, more traditional, supply chains. While dependence in a supply chain relationship typically leads to an increase in reliance on mediated power, GPO-dependent HCOs instead perceive a decrease in GPO mediated power. Furthermore, HCOs that rely on procurement service from GPOs are increasingly dependent on the OEMs.

  9. Recent helicity source and power supply improvements in CTX

    International Nuclear Information System (INIS)

    Henins, I.; Knox, S.O.; Jarboe, T.R.; Barnes, C.W.

    1985-01-01

    Since the last CT Symposium, two major changes in CTX have been the introduction of pulse forming networks (PFNs) to drive the coaxial electrode helicity source, and the very recent installation of a larger source with electrode diameters about twice of the previous ones. The power supplies used for CTX have ranged from the simple connection of the capacitor bank across the electrode collector plates (slow mode) to the more sophisticated PFNs, described here, which optimize the energy transfer from the capacitor bank to the magnetic fields of the spheromak. Using the PFNs, the formation and sustainment phase to peak toroidal plasma current lasts longer (approx. =0.7 ms) than in the slow mode (approx. =0.05 ms), thus lowering the peak current that must flow through the electrode surfaces. Also, by supplying the source electrodes with both a square pulse current waveform and a quasi-steady source flux, phi/sub g/, one can generate helicity at a constant source lambda/sub g/ parameter. The use of a larger diameter helicity source will improve the energy efficiency of helicity injection and allow higher source current for the same surface current density because of the larger electrode surface area

  10. Optimizing efficiency on conventional transformer based low power AC/DC standby power supplies

    DEFF Research Database (Denmark)

    Nielsen, Nils

    2004-01-01

    This article describes the research results for simple and cheap methods to reduce the idle- and load-losses in very low power conventional transformer based power supplies intended for standby usage. In this case "very low power" means 50 Hz/230 V-AC to 5 V-DC@1 W. The efficiency is measured...... on two common power supply topologies designed for this power level. The two described topologies uses either a series (or linear) or a buck regulation approach. Common to the test power supplies is they either are using a standard cheap off-the-shelf transformer, or one, which are loss optimized by very...

  11. TFTR CAMAC power supplies reliability

    International Nuclear Information System (INIS)

    Camp, R.A.; Bergin, W.

    1989-01-01

    Since the expected life of the Tokamak Fusion Test Reactor (TFTR) has been extended into the early 1990's, the issues of equipment wear-out, when to refurbish/replace, and the costs associated with these decisions, must be faced. The management of the maintenance of the TFTR Central Instrumentation, Control and Data Acquisition System (CICADA) power supplies within the CAMAC network is a case study of a set of systems to monitor repairable systems reliability, costs, and results of action. The CAMAC network is composed of approximately 500 racks, each with its own power supply. By using a simple reliability estimator on a coarse time interval, in conjunction with determining the root cause of individual failures, a cost effective repair and maintenance program has been realized. This paper describes the estimator, some of the specific causes for recurring failures and their correction, and the subsequent effects on the reliability estimator. By extension of this program the authors can assess the continued viability of CAMAC power supplies into the future, predicting wear-out and developing cost effective refurbishment/replacement policies. 4 refs., 3 figs., 1 tab

  12. Power supply requirements for a tokamak fusion reactor

    International Nuclear Information System (INIS)

    Brooks, J.N.; Kustom, R.L.

    1979-02-01

    The power supply requirements for a 7-M major radius commercial tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and MHD calculations, and power supply characteristics and cost data. A conventional system using an MGF set and solid-state rectifier/inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (approx. > 8 s) seems to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development

  13. Power supply and stabilization of the supply system on board using decentralized voltage rectifiers

    Energy Technology Data Exchange (ETDEWEB)

    Grueb, W; Wegerer, K

    1987-04-01

    The functionally redundant power supply system of the Transrapid 06 II maglev train is described; it comprises four independent, battery-buffered networks and 30 linear generators per train section. Voltage rectifiers adapt the velocity- and load-dependent linear generator voltage to the 440 V d.c. networks and assure dynamic stabilisation as well as buffer battery loading. The result is a high-reliability power supply system on board with optimum utilisation of the power supplied by the linear generators while the train is running.

  14. A Performance Improvement of Power Supply Module for Safety-related Controller

    International Nuclear Information System (INIS)

    Kim, Jong-Kyun; Yun, Dong-Hwa; Hwang, Sung-Jae; Lee, Myeong-Kyun; Yoo, Kwan-Woo

    2015-01-01

    In this paper, in relation to voltage shortage state when power supply module is a slave mode, the performance improvement by modifying a PFC(Power Factor Correction) circuit is presented. With the modification of the PFC circuit, the performance improvement in respect of the voltage shortage state when the power supply module is a slave mode is checked. As a result, POSAFE-Q PLC can ensure the stability with the redundant power supply module. The purpose of this paper is to improve the redundant performance of power supply module(NSPS-2Q). It is one of components in POSAFE-Q which is a PLC(Programmable Logic Controller) that has been developed for the evaluation of safety-related. Power supply module provides a stable power in order that POSAFE-Q can be operated normally. It is possible to be mounted two power supply modules in POSAFE-Q for a redundant(Master/Slave) function. So that even if a problem occurs in one power supply module, another power supply module will provide a power to POSAFE-Q stably

  15. A Performance Improvement of Power Supply Module for Safety-related Controller

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong-Kyun; Yun, Dong-Hwa; Hwang, Sung-Jae; Lee, Myeong-Kyun; Yoo, Kwan-Woo [PONUTech Co., Seoul (Korea, Republic of)

    2015-10-15

    In this paper, in relation to voltage shortage state when power supply module is a slave mode, the performance improvement by modifying a PFC(Power Factor Correction) circuit is presented. With the modification of the PFC circuit, the performance improvement in respect of the voltage shortage state when the power supply module is a slave mode is checked. As a result, POSAFE-Q PLC can ensure the stability with the redundant power supply module. The purpose of this paper is to improve the redundant performance of power supply module(NSPS-2Q). It is one of components in POSAFE-Q which is a PLC(Programmable Logic Controller) that has been developed for the evaluation of safety-related. Power supply module provides a stable power in order that POSAFE-Q can be operated normally. It is possible to be mounted two power supply modules in POSAFE-Q for a redundant(Master/Slave) function. So that even if a problem occurs in one power supply module, another power supply module will provide a power to POSAFE-Q stably.

  16. Citizen preference assessment for power supply visions using choice experiments

    International Nuclear Information System (INIS)

    Nakatani, Jun; Tahara, Kiyotaka; Tanaka, Koji; Matsumoto, Shinya; Mizuno, Tateki

    2015-01-01

    In this paper, citizen preferences for power supply visions were assessed using choice experiments. In particular, preferences for the composition of power generation including renewable energy and nuclear power were analyzed. We also investigated how the need and consciousness for electricity saving affected the preferences for power supply visions. The results indicated that a respondent group who felt negative about resuming the operations at nuclear power plants had discriminative preferences for attributes of the power supply visions, and that the priority of carbon dioxide emissions as a criterion for evaluating the power supply visions became lower when the composition of power generation was presented. Consciousness for electricity saving, as well as preferences for nuclear power generation, differed depending on regions of residence, while their relationship was similar among respondent groups who lived in the jurisdictional areas of the electric power companies that had experienced risks of demand-supply gaps. (author)

  17. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  18. Very High Frequency Switch-Mode Power Supplies

    DEFF Research Database (Denmark)

    Madsen, Mickey Pierre

    The importance of technology and electronics in our daily life is constantly increasing. At the same time portability and energy efficiency are currently some of the hottest topics. This creates a huge need for power converters in a compact form factor and with high efficiency, which can supply...... these electronic devices. This calls for new technologies in order to miniaturize the power electronics of today. One way to do this is by increasing the switching frequency dramatically and develop very high frequency switch mode power supplies. If these converters can be designed to operate efficiently, a huge...... size, weight and cost reduction can be achieved due to the smaller energy storing elements needed at these frequencies. The research presented in this thesis focuses on exactly this. First various technologies for miniaturization of power supplies are studied, e.g. piezo electric transformers, wide...

  19. A Conceptual Design Study for the Error Field Correction Coil Power Supply in JT-60SA

    International Nuclear Information System (INIS)

    Matsukawa, M.; Shimada, K.; Yamauchi, K.; Gaio, E.; Ferro, A.; Novello, L.

    2013-01-01

    This paper describes a conceptual design study for the circuit configuration of the Error Field Correction Coil (EFCC) power supply (PS) to maximize the expected performance with reasonable cost in JT-60SA. The EFCC consists of eighteen sector coils installed inside the vacuum vessel, six in the toroidal direction and three in the poloidal direction, each one rated for 30 kA-turn. As a result, star point connection is proposed for each group of six EFCC coils installed cyclically in the toroidal direction for decoupling with poloidal field coils. In addition, a six phase inverter which is capable of controlling each phase current was chosen as PS topology to ensure higher flexibility of operation with reasonable cost.

  20. High precision power supplies for the National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Olsen, R.; Langenbach, H.

    1987-04-01

    Since beam stability depends to a considerable degree on the stability of the magnet power supplies, and it is desired to push for 3 GeV operation, it was required that new power supplies be obtained for the quadrupoles and sextupoles. These power supplies were to have the lowest ripple that could be reasonably achieved, and were to have a current regulation of better than 10 PPM. In addition, since they operate over a 5 : 1 voltage range, it was considered desirable to ensure that they operated with a good power factor over the operating range. The dipole power supply was modified to use the techniques employed in the smaller supplies

  1. OVERVIEW OF THE RHIC INSERTION REGION, SEXTUPOLE, AND SNAKE POWER SUPPLY SYSTEMS

    International Nuclear Information System (INIS)

    BRUNO, D.; ENG, W.; GANETIS, G.; LAMBIASE, R.F.; SANDBERG, J.

    2001-01-01

    The Relativistic Heavy Ion Collider (RHIC) was commissioned in 1999 and 2000. RHIC requires power supplies to supply currents to highly inductive superconducting magnets. The RHIC Insertion Region (IR) contains many shunt power supplies to trim the current of different magnet elements in a large superconducting magnet circuit. There are a total of 237 Insertion Region power supplies in both RHIC rings. RHIC also requires sextupole power supplies. One sextupole power supply is connected across 12 sextupole magnets. There are a total of 24 sextupole power supplies in both rings. Snake magnets are also a part of the RHIC ring, and these snake magnets also require power supplies. There shall be a total of 24 snake power supplies in both rings. Power supply technology, connections, control systems and interfacing with the Quench Protection System will be presented

  2. Power supply requirements for a tokamak fusion reactor

    International Nuclear Information System (INIS)

    Brooks, J.N.; Kustom, R.L.

    1979-01-01

    The power supply requirements for a 7-m major radius commerical tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and magnetohydrodynamics calculations, and power supply characteristics and cost data. A conventional system using a motor-generator flywheel set and solid-state rectifier-inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (greater than or equal to 8 s) seem to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development

  3. Design study of electrical power supply system for tokamak fusion power reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Design study of the electrical power supply system for a 2000MWt Tokamak-type fusion reactor has been carried out. The purposes are to reveal and study problems in the system, leading to a plan of the research and development. Performed were study of the electrical power supply system and design of superconducting inductive energy storages and power switches. In study of the system, specification and capability of various power supplies for the fusion power reactor and design of the total system with its components were investigated. For the superconducting inductive energy storages, material choice, design calculation, and structural design were conducted, giving the size, weight and performance. For thyristor switches, circuit design in the parallel / series connection of element valves and cooling design were studied, providing the size and weight. (auth.)

  4. Control of highly vertically unstable plasmas in TCV with internal coils and fast power supply

    International Nuclear Information System (INIS)

    Favre, A.; Moret, J.M.; Chavan, R.; Fasel, D.; Hofmann, F.; Lister, J.B.; Mayor, J.M.; Perez, A.; Elkjaer, A.

    1996-01-01

    The goal of TCV (Tokamak a Configuration Variable) is to investigate effects of plasma shape, in particular high elongation (up to 3), on tokamak physics. Such elongated configurations (I p ≅1 MA) are highly vertically unstable with growth rates up to γ=4000 s -1 . Control of the vertical position using the poloidal coils located outside the vessel is limited to γ≤1000 s -1 because of the shielding effect of the conductive vessel and because of the relative slow time response of their power supplies (0.8 ms thyristor 12 pulse switching at 120 Hz). This dictated the necessity to install a coil set inside the vacuum vessel fed with a Fast Power Supply (FPS). The choice and design of the system with a special attention to the mechanical and electrical constraints in TCV tokamak, as the results and real performances, will be presented. (author) 3 figs., 2 tabs., 2 refs

  5. Digitally Controlled Envelope Tracking Power Supply for an RF Power Amplifier

    DEFF Research Database (Denmark)

    Jakobsen, Lars Tønnes; Andersen, Michael Andreas E.

    2007-01-01

    due to clock frequency quantization. An envelope tracking power supply for an RF Power Amplifier (RFPA) can help improve system efficiency by reducing the power consumption of the RFPA. To show the advantage of the DiSOM over traditional counter based Digital PWM modulators two designs were compared...... in both simulation and by experiment. The results shows that the DiSOM could give an increase in open loop bandwidth by more than a factor of two and an reduce the closed loop output impedance of the power supply by a factor of 5 at the output filter resonance frequency....

  6. Intense neutron source: high-voltage power supply specifications

    International Nuclear Information System (INIS)

    Riedel, A.A.

    1980-08-01

    This report explains the need for and sets forth the electrical, mechanical and safety specifications for a high-voltage power supply to be used with the intense neutron source. It contains sufficient information for a supplier to bid on such a power supply

  7. Modular high voltage power supply for chemical analysis

    Science.gov (United States)

    Stamps, James F [Livermore, CA; Yee, Daniel D [Dublin, CA

    2008-07-15

    A high voltage power supply for use in a system such as a microfluidics system, uses a DC-DC converter in parallel with a voltage-controlled resistor. A feedback circuit provides a control signal for the DC-DC converter and voltage-controlled resistor so as to regulate the output voltage of the high voltage power supply, as well as, to sink or source current from the high voltage supply.

  8. Proposal of modification of the Atucha I nuclear power plant's emergency power supply system

    International Nuclear Information System (INIS)

    Palacio, Pedro; Dabove, Mario

    1989-01-01

    The emergency power supply system of Atucha I N.P.P. consists of three 50% diesel generators. During the transient from normal power supply to emergency power supply (approximately 15 seconds) an hydraulic generator takes care of the emergency system. By this way, the emergency busbars constitute themselves an interruption free system. The two emergency busbars work normally coupled. This proposal consists of the following modifications: 1) Add a new diesel generator in order to allow the operation with two diesel generators per busbar. 2) To work with the two emergency busbars not coupled as normal operation mode. 3) To eliminate the hydraulic generator from the emergency power supply system, in order to simplify the operation and to reduce the failure possibility. Without the hydraulic turbine generator, the emergency busbars loose the interruption free condition. For this reason, for the loads that are not able for this mode of operation and are connected to the emergency power supply system, two additional low-voltage interruption free busbars are necessary. Finally, this proposal is compared with the Atucha II N.P.P. emergency power supply system. (Author)

  9. Correction magnet power supplies for APS machine

    International Nuclear Information System (INIS)

    Kang, Y.G.

    1991-01-01

    The Advanced Photon Source machine requires a number of correction magnets; five kinds for the storage ring, two for the injector synchrotron, and two for the positron accumulator ring. Three types of bipolar power supply will be used for all the correction magnets. This paper describes the design aspects and considerations for correction magnet power supplies for the APS machine. 3 refs., 3 figs., 1 tab

  10. Power supply control units for APS ring magnets

    International Nuclear Information System (INIS)

    Despe, O.D.

    1990-01-01

    The APS storage ring (1104 meters) is divided into 40 sectors. Each sector has 38 magnet coils in five magnet bases. Every alternate sector has an additional quadrupole magnet for skew correction. AR the main dipole magnets, two in each sector are connected in series and fed from one power supply unit. A base is controlled by one power supply control unit (PSCU). Each PSCU is connected to the host computer via a local area network (LAN). This note discusses the hardware configuration of the typical power supply control system used by the APS magnets and the software commands supported by the PSCU

  11. Operation of SST-1 TF power supply during SST-1 campaigns

    International Nuclear Information System (INIS)

    Sharma, Dinesh Kumar; Vora, Murtuza M.; Ojha, Amit; Singh, Akhilesh Kumar; Bhavsar, Chirag

    2015-01-01

    Highlights: • SST-1 TF power supply is 12 pulse SCR converter circuit. • TF power supply protection, measurement and control scheme are explained. • Quench, emergency and normal shot process is explained and results of SST-1 campaigns are shown. • Dynamic control of TF current. • The paper shows the results of last ten SST-1 campaigns. - Abstract: SST-1 TF power supply provides the direct current for the required magnetic field of TF coil. TF power supply includes transformer, 12-pulse converter, bus bar, water-cooled cable, protection and measuring equipments, and isolator, VME DAC system and GUI software. TF power supply is operated through GUI software built in TCL/Tk. VME DAC system monitors the parameters, provides On/Off commands, voltage and current references and initiates predefined reference to emergency shutdown. The emergency shutdown is hardwired to TF power supply from central control. During quench power supply converter opens DCCB and dump resistor is connected in the circuit and VME DAC system acquires bus bar voltage, dump voltage and dump current. Operation of TF power supply also requires monitoring of SCR and transformer temperature and water flow rate of water-cooled cable during high current long pulse shot. Before start up of TF power supply a quench simulation is performed to check the readiness of protection. This paper describes pre startup operation, normal shot operation, emergency and quench process, dynamic control and complete shutdown operation of TF power supply.

  12. Operation of SST-1 TF power supply during SST-1 campaigns

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, Dinesh Kumar, E-mail: dinesh@ipr.res.in; Vora, Murtuza M.; Ojha, Amit; Singh, Akhilesh Kumar; Bhavsar, Chirag

    2015-10-15

    Highlights: • SST-1 TF power supply is 12 pulse SCR converter circuit. • TF power supply protection, measurement and control scheme are explained. • Quench, emergency and normal shot process is explained and results of SST-1 campaigns are shown. • Dynamic control of TF current. • The paper shows the results of last ten SST-1 campaigns. - Abstract: SST-1 TF power supply provides the direct current for the required magnetic field of TF coil. TF power supply includes transformer, 12-pulse converter, bus bar, water-cooled cable, protection and measuring equipments, and isolator, VME DAC system and GUI software. TF power supply is operated through GUI software built in TCL/Tk. VME DAC system monitors the parameters, provides On/Off commands, voltage and current references and initiates predefined reference to emergency shutdown. The emergency shutdown is hardwired to TF power supply from central control. During quench power supply converter opens DCCB and dump resistor is connected in the circuit and VME DAC system acquires bus bar voltage, dump voltage and dump current. Operation of TF power supply also requires monitoring of SCR and transformer temperature and water flow rate of water-cooled cable during high current long pulse shot. Before start up of TF power supply a quench simulation is performed to check the readiness of protection. This paper describes pre startup operation, normal shot operation, emergency and quench process, dynamic control and complete shutdown operation of TF power supply.

  13. Modular Power Supply for Micro Resistance Welding

    Directory of Open Access Journals (Sweden)

    Bondarenko Oleksandr

    2017-07-01

    Full Text Available The study is devoted to the important issue of enhancing the circuitry and characteristics of power supplies for micro resistance welding machines. The aim of the research is to provide high quality input current and to increase the energy efficiency of the output pulse generator by means of improving the circuit topologies of the power supply main blocks. In study, the principle of constructing the power supply for micro resistance welding, which provides high values of output welding current and high accuracy of welding pulse formation, makes it possible to reduce energy losses, and provides high quality of consumed input current, is represented. The multiphase topology of the charger with power factor correction based on SEPIC converters is suggested as the most efficient for charging the supercapacitor storage module. The multicell topology of the supercapacitor energy storage with voltage equalizing is presented. The parameters of the converter cells are evaluated. The calculations of energy efficiency of the power supply’s input and output converters based on suggested topologies are carried out and verified in MATLAB Simulink. The power factor value greater than 99 % is derived.

  14. A current-controlled PWM bipolar power supply for a magnet load

    International Nuclear Information System (INIS)

    Kang, Y.G.; McGhee, D.G.

    1994-01-01

    The Advanced Photon Source, at Argonne National Laboratory will produce the world's brightest x-ray beams when it is complete. A number of correction magnets are used to maintain proper beam position. Basically, two different types of bipolar power supplies are used for all the correction magnets: one requires dc correction only, and the other requires dc and ac correction. Normally linear-mode power amplifiers would be used for the bipolar power supplies. However, linear-mode power amplifiers dissipate a substantial amount of power as heat, resulting in poor efficiency for their large size. In addition, most commercial bipolar power supplies are linear-mode and available for lower power levels. Therefore, for higher power levels it was necessary to design a bipolar power supply that uses switch-mode power conversion. This paper describes a control technique for a pulse-width-modulatcd bipolar power supply, which can deliver a controlled current, dc plus ac to a correction magnet. A design example of a 150A bipolar power supply is presented

  15. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  16. Electric power supply for a mine: Principles and examples

    International Nuclear Information System (INIS)

    Mienville, G.; Grellety, J.

    1990-01-01

    The power supply of a water pumping system at the PEN or RAN mine is studied. A reliable pumping system was required because of the small volume of the available drainage reservoirs. Different power supply systems are considered. The 20 RV system configuration and adapted safety devices are described. The use of a generating set was required to ensure the mine operations. The power supply system in use allowed a reduction of the electricity cost [fr

  17. Sustainable Power Supply Solutions for Off-Grid Base Stations

    Directory of Open Access Journals (Sweden)

    Asma Mohamad Aris

    2015-09-01

    Full Text Available The telecommunication sector plays a significant role in shaping the global economy and the way people share information and knowledge. At present, the telecommunication sector is liable for its energy consumption and the amount of emissions it emits in the environment. In the context of off-grid telecommunication applications, off-grid base stations (BSs are commonly used due to their ability to provide radio coverage over a wide geographic area. However, in the past, the off-grid BSs usually relied on emission-intensive power supply solutions such as diesel generators. In this review paper, various types of solutions (including, in particular, the sustainable solutions for powering BSs are discussed. The key aspects in designing an ideal power supply solution are reviewed, and these mainly include the pre-feasibility study and the thermal management of BSs, which comprise heating and cooling of the BS shelter/cabinets and BS electronic equipment and power supply components. The sizing and optimization approaches used to design the BSs’ power supply systems as well as the operational and control strategies adopted to manage the power supply systems are also reviewed in this paper.

  18. Power supply of ETL-TPE 2

    International Nuclear Information System (INIS)

    Takeda, Syohei; Sato, Yasuhiro; Kiyama, Satoru; Ikeda, Nagayasu

    1986-01-01

    The ETL-TPE2 experiment is planned to investigate a behavior of high beta plasma with high temperature. A system design of power supply to generate and to confine the plasma is described. Essential features of the design are the following; 1) To obtain a dense plasma with high temperature, two capacitor banks with opposite polarities of 80 kV charging voltage are provided in tandem feed for the toroidal fast field. 2) A high current pulse with long duration is supplied by a power crowbar system and realizes the investigation of the plasma confinement for a longer pulsed magnetic field. A power supply system of the power crowbar is connected with a main circuit in series through a current transformer. The circuit system is operated at high efficiency and high reliability. 3) In the vertical and compensating field circuits, each rise time and peak value of currents can be controlled over a wide range of pre-set programmings corresponding to an experimental condition. 4) A small resistance is connected with a crowbar circuit in a compression pre-heat field circuit. The circuit can be crowbarred at an arbitrary phase. This operation and the effect of additional resistance are favourable to maintain an effective plasma heating and to improve the plasma confinement. (author)

  19. Renewable energy for professional applications: a guide to implementing off-grid power supplies in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Paish, O.; Oldach, R.

    2002-09-01

    These guidelines are intended to help those considering renewable energy systems to supply power to off-grid applications without access to the UK mains electricity network. The guidelines consider: examples of renewable energy systems used applications with a low power demand in the UK; renewable energy technologies relevant to off-grid applications (solar photovoltaics, wind generators, micro-hydro turbines and hybrid systems); nine steps for project implementation; defining and optimising the load application; estimating energy resources when using solar energy, wind power and hydro power; general rules of thumb when choosing a power source; system components such as batteries, inverters, support structure and civil works; basic system sizing calculations; developing a specification and contacting suppliers; checking equipment, installation and commissioning; legal and other non-technical issues; operating issues such as maintenance and safety; and selected case studies from the UK.

  20. Power supply trip control for nuclear reactor

    International Nuclear Information System (INIS)

    Hager, R.E.; Gutman, Jerzy.

    1987-01-01

    A control system for a trip coil in a switchgear mechanism controls the supply of electrical power to a process control device and ensures de-energization of the trip coil shortly after the trip coil is energized. The trip coil is energized not by an independent dc source as in prior art, but from rectified power from a step down transformer supplied from the switchgear output side. The transformer feeds a rectifier which is connected to the trip coil via a trip activation device. The output of the rectifier can be monitored using an optical converter to determine the ability of the control system to activate the trip coil and the condition of the power supplied to the process control device. The control device may be a rod positioner in a pressurised water nuclear reactor. (author)

  1. A New Concept of Controller for Accelerators' Magnet Power Supplies

    Science.gov (United States)

    Visintini, Roberto; Cleva, Stefano; Cautero, Marco; Ciesla, Tomasz

    2016-04-01

    The complexity of a particle accelerator implies the remote control of very large numbers of devices, with many different typologies, either distributed along the accelerator or concentrated in locations, often far away from each other. Local and global control systems handle the devices through dedicated communication channels and interfaces. Each controlled device is practically a “smart node” performing a specific task. In addition, very often, those tasks are managed in real-time mode. The performances required to the control interface has an influence on the cost of the distributed nodes as well as on their hardware and software implementation. In large facilities (e.g. CERN) the “smart nodes” derive from specific in-house developments. Alternatively, it is possible to find on the market commercial devices, whose performances (and prices) are spread over a broad range, and spanning from proprietary design (customizable to the user's needs) to open source/design. In this paper, we will describe some applications of smart nodes in the particle accelerators field, with special focus on the power supplies for magnets. In modern accelerators, in fact, magnets and their associated power supplies constitute systems distributed along the accelerator itself, and strongly interfaced with the remote control system as well as with more specific (and often more demanding) orbit/trajectory feedback systems. We will give examples of actual systems, installed and operational on two light sources, Elettra and FERMI, located in the Elettra Research Center in Trieste, Italy.

  2. A new power supply for superconductive magnetic energy storage system

    International Nuclear Information System (INIS)

    Karady, G.G.; Han, B.M.

    1992-01-01

    In this paper a new power supply for a superconductive magnetic energy storage system, which permits a fast independent regulation of the active and reactive power, is presented. The power supply is built with several units connected in parallel. Each unit consists of a 24-pulse bridge converter, thyristor-switched tap-changing transformer, and thyristor-switched capacitor bank. Its system operation is analyzed by computer simulation and a feasible system realization is shown. A superconductive magnetic energy storage system with the proposed power supply has the capability of leveling the load variation, damping the low-frequency oscillation, and improving the transient stability in the power system. This power supply can be built with commercially available components using well-proven technologies

  3. Tokamak Physics Experiment (TPX) power supply design and development

    International Nuclear Information System (INIS)

    Neumeyer, C.; Bronner, G.; Lu, E.; Ramakrishnan, S.

    1995-01-01

    The Tokamak Physics Experiment (TPX) is an advanced tokamak project aimed at the production of quasi-steady state plasmas with advanced shape, heating, and particle control. TPX is to be built at the Princeton Plasma Physics Laboratory (PPPL) using many of the facilities from the Tokamak Fusion Test Reactor (TFTR). TPX will be the first tokamak to utilize superconducting (SC) magnets in both the toroidal field (TF) and poloidal field (PF) systems. This new feature requires a departure from the traditional tokamak power supply schemes. This paper describes the plan for the adaptation of the PPPL/FTR power system facilities to supply TPX. Five major areas are addressed, namely the AC power system, the TF, PF and Fast Plasma Position Control (FPPC) power supplies, and quench protection for the TF and PF systems. Special emphasis is placed on the development of new power supply and protection schemes

  4. Design of digital logic control for accelerator magnet power supply

    International Nuclear Information System (INIS)

    Long Fengli; Hu Wei; Cheng Jian

    2008-01-01

    For the accelerator magnet power supply, usually the Programmable Logic Controller (PLC) is used to server as the controller for logic protection and control. Along with the development of modern accelerator technology, it is a trend to use fully-digital control to the magnet power supply. It is possible to integrate the logic control part into the digital control component of the power supply, for example, the Field Programmable Gate Array (FPGA). The paper introduces to different methods which are designed for the logic protection and control for accelerator magnet power supplies with the FPGA as the control component. (authors)

  5. Practical computer analysis of switch mode power supplies

    CERN Document Server

    Bennett, Johnny C

    2006-01-01

    When designing switch-mode power supplies (SMPSs), engineers need much more than simple "recipes" for analysis. Such plug-and-go instructions are not at all helpful for simulating larger and more complex circuits and systems. Offering more than merely a "cookbook," Practical Computer Analysis of Switch Mode Power Supplies provides a thorough understanding of the essential requirements for analyzing SMPS performance characteristics. It demonstrates the power of the circuit averaging technique when used with powerful computer circuit simulation programs. The book begins with SMPS fundamentals and the basics of circuit averaging models, reviewing most basic topologies and explaining all of their various modes of operation and control. The author then discusses the general analysis requirements of power supplies and how to develop the general types of SMPS models, demonstrating the use of SPICE for analysis. He examines the basic first-order analyses generally associated with SMPS performance along with more pra...

  6. Simulation evaluation of capacitor bank impact on increasing supply current for alumunium production

    Science.gov (United States)

    Hasan, S.; Badra, K.; Dinzi, R.; Suherman

    2018-03-01

    DC current supply to power the electrolysis process in producing aluminium at PT Indonesia Asahan Aluminium (Persero) is about 193 kA. At this condition, the load voltage regulator (LVR) transformer generates 0.89 lagging power factor. By adding the capacitor bank to reduce the harmonic distortion, it is expected that the supply current will increase. This paper evaluates capacitor bank installation impact on the system by using ETAP 12.0 simulation. It has been obtained that by installing 90 MVAR capacitor bank in the secondary part of LVR, the power factor is corrected about 8% and DC current increases about 13.5%.

  7. Intermediate-sized photovoltaic plants to supply power villages: Future developments

    International Nuclear Information System (INIS)

    Previ, A.

    1990-01-01

    The activity promoted by the European Communities, aimed at demonstrating the feasibility of supplying both active and passive power distribution networks by means of photovoltaic plants (PV) has been highly successful. The PV plants at Aghia Roumeli, Pellworm, Rondulinu, and Vulcano are stand-alone plants that can supply small isolated communities. The plant at Kytnos supplies power to the grid with the help of electrochemical storage; the plants at Pellworm, and Vulcano can also supply power to the grid, the first with e.c. storage and the second without such storage. This paper gives an overview of the activity promoted by the Communities EEC-DGXII research group aimed at demonstrating the feasibility of supplying both active and passive power distribution networks by means of PV plants. Possible improvements of the power conditioning sub-system are presented

  8. Market-driven energy pricing necessary to ensure China's power supply

    International Nuclear Information System (INIS)

    Wang, Qiang; Qiu, Huan-Ning; Kuang, Yaoqiu

    2009-01-01

    China's rapid economic growth has strained its power supply, as manifested for instance by the widespread 2008 power shortage. The cause for this shortage is thought to be the current Chinese energy pricing system, which is mainly government rather than market controlled. Government-regulated price-caps for coal have seriously affected coal supply. At the same time price-caps for electricity supply have caused suspension of power plant operation. As a result, the average operating time of coal-fired power plants declined 50 h annually across the nation in the first half of 2008 compared to the previous year, despite clear power shortages. Here, it will be suggested that energy pricing, set by supply and demand may effectively discourage excessive growth in heavy industry, substantially encourage energy conservation and efficiency, and curb the rapid electricity demand in China. It will be argued that a market-oriented electricity pricing mechanism is required for China to secure its future power supply. (author)

  9. Resonant converter topologies for constant-current power supplies and their applications

    International Nuclear Information System (INIS)

    Borage, Mangesh

    2013-01-01

    Power electronics, in general, and power supplies, in particular, is an important field of accelerator technology due to its widespread use, for instance in dc, ramp or pulse magnet power supplies, high voltage power supplies for electrostatic accelerators and RF amplifies, power supplies for vacuum pumps, vacuum gauges, beam diagnostic devices etc. It has been possible to meet stringent performance requirements with the continuing advancement in the field of power electronics. Resonant converters have been an active area of research in power electronics field due to variety of topologies, diverse, peculiar and useful characteristics. While the majority of the previous work on resonant converters has been directed towards developing methods of analysis and control techniques for the mentioned applications, very little has been done to explore their suitability for application as a constant-current power supply, which is either inherently required or can be advantageously applied in power supplies for various accelerator subsystems and other industrial applications such as electric arc welding, laser diode drivers, magnet illumination systems, battery charging, electrochemical processes etc.

  10. New experience on construction and installation work in Qinshan PHWR nuclear power plant

    International Nuclear Information System (INIS)

    Lu Huaxiang

    2004-01-01

    The article provides a summary of the new experience on construction management and construction technology in the field of civil construction and installation work in Qinshan PHWR nuclear power plant, with focus on innovation in project management mode, new technology application and computerized management of construction and installation work. Management innovation, technical innovation and information technology are the key contributors to overall success of Qinshan PHWR nuclear power plant in construction and installation work. The new experience derived in these fields will be of great significance to promote independent construction of the new-round nuclear power projects in China. (author)

  11. Characteristics of inversion operation on Fermilab phase controlled pulsed power supplies

    International Nuclear Information System (INIS)

    Trendler, R.C.

    1977-01-01

    A well known property of phase controlled rectifiers with pulsed inductive loads is the ability to advance firing angles from full rectification (positive voltage) to full inversion (negative voltage). Though these properties have been effectively used in the Main Ring power supplies, they have not been extensively utilized for beam line magnet power supplies. Modifications to permit advancing phase angle sufficiently to permit inversion were made on TransRex 500 kW power supplies and Ling 55 kW power supplies. The objective of these modifications was to rapidly reduce the current in magnet loads to zero upon command. The modifications required and the performance of the power supplies are discussed

  12. One of the power supplies used for electrostatic separators

    CERN Multimedia

    1975-01-01

    Internal part of a power supply SAME (± 600 kV, 4 mA). These power supplies were used to power the electrodes (positive and negative), 1 to 9 m length, within a conditioned tank with Ne (30%)/He (70%) at less than a thousandth of mbar. Here, Michel Zahnd, Jean Chaminaud

  13. Development of the on-site power supply in German nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Simon, M. [Gesellschaft fuer Reaktorsicherheit - GRS mbH, Schwertnergasse 1, D-5000 Koeln 1, Cologne (Germany)

    1986-02-15

    The design of the on-site power supply is different in German Nuclear Power Plants, depending on age and size of the plant. The cause for this is the evolution of the safety requirements. The general development of the design of safety Systems, which resulted in a strict separation of redundant trains is also reflected in the design of the emergency power system and even the complete on-site power supply System. This will be demonstrated by different examples. The advantages of this design with respect to the availability of on-site power will be explained and verified by means of operating experience. (author)

  14. Gas centrifuge power supplies (inverters): Key components and subassemblies

    International Nuclear Information System (INIS)

    1987-08-01

    This document was prepared to serve as a guide for export control officials in their interpretation, understanding, and implementation of exports laws that relate to the international trigger list entry for gas centrifuge power supplies (also known as frequency changers, convertors, or inverters) and parts, components, and subassemblies of such power supplies. Particular emphasis is placed on descriptions of the key parts, components, and subassemblies of such power supplies, which were previously unspecified, so as to clarify the intent of the international trigger list entry

  15. WORK SYSTEM ANALYSIS OF POWER SUPPLY IN OPTIMIZING ELECTRICITY ON PERSONAL COMPUTER (PC

    Directory of Open Access Journals (Sweden)

    Sudarmaji Sudarmaji

    2017-12-01

    Full Text Available Working Principles DC Power Supply - is an energy source for a computer to operate. The power supply changes the current from AC 110 volts to 60Hz or 220 volts 50Hz to DC + 3.3 volts, +5 volts and + 12 volts. Power Supply must carry a good and stable DC power supply so the system can run well. Tools running on the voltage supplied by the onboard voltage regulator, for example RIMM and RIMM require 2.5 volts while AGP AX and cards require 1.5 volts, both supplied by the onboard regulator of the motherboard. In addition to supplying power, the Power Supply can prevent the computer from starting until a Power Supply voltage exists at a predetermined area. Power Good is a sign of a special test that is sent to the motherboard as an active signal on the computer, usually marked by a green light when the power button is pressed. The current issued by the Power Supply is a direct current (DC, power output is composed of 200 watts, 250 watts, 300 watts, 350 watts, 400 watts to 600 watts. Computers with Intel Pentium 4 processors and above use power of 380 watts to 450 watts. Keywords: Power Supply, Computer, DC, Power Good, and volt

  16. Lunar surface fission power supplies: Radiation issues

    International Nuclear Information System (INIS)

    Houts, M.G.; Lee, S.K.

    1994-01-01

    A lunar space fission power supply shield that uses a combination of lunar regolith and materials brought from earth may be optimal for early lunar outposts and bases. This type of shield can be designed such that the fission power supply does not have to be moved from its landing configuration, minimizing handling and required equipment on the lunar surface. Mechanisms for removing heat from the lunar regolith are built into the shield, and can be tested on earth. Regolith activation is greatly reduced compared with a shield that uses only regolith, and it is possible to keep the thermal conditions of the fission power supply close to these seen in free space. For a well designed shield, the additional mass required to be brought fro earth should be less than 1000 kg. Detailed radiation transport calculations confirm the feasibility of such a shield

  17. Lunar surface fission power supplies: Radiation issues

    International Nuclear Information System (INIS)

    Houts, M.G.; Lee, S.K.

    1994-01-01

    A lunar space fission power supply shield that uses a combination of lunar regolith and materials brought from earth may be optimal for early lunar outposts and bases. This type of shield can be designed such that the fission power supply does not have to be moved from its landing configuration, minimizing handling and required equipment on the lunar surface. Mechanisms for removing heat from the lunar regolith are built into the shield, and can be tested on earth. Regolith activation is greatly reduced compared with a shield that uses only regolith, and it is possible to keep the thermal conditions of the fission power supply close to those seen in free space. For a well designed shield, the additional mass required to be brought from earth should be less than 1,000 kg. Detailed radiation transport calculations confirm the feasibility of such a shield

  18. Radioisotope Power Supply, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Between 1998 and 2003, Hi-Z Technology developed and built a 40 mW radioisotope power supply (RPS) that used a 1 watt radioisotope heater unit (RHU) as the energy...

  19. Experiment of Power Supply Method for WLAN Sensor Using Both Energy Harvesting and Microwave Power Transmission

    International Nuclear Information System (INIS)

    Sakaguchi, K; Yamashita, S; Yamamoto, K; Nishio, T; Morikura, M; Huang, Y; Shinohara, N

    2014-01-01

    This paper proposes to improve effectiveness of supplying a sensor with energy using microwave power transmission (MPT) and energy harvesting (EH). The MPT duration should be as short as possible to avoid serious interference between the MPT and wireless local area network data transmission when co-channel operation of both microwave power transmission (MPT) and wireless data transmissions is performed. To shorten the MPT duration, we use multiple power sources such as an MPT source and an EH source to supply a sensor with power. Here, an overcharge or an energy shortage could occur at the sensor if the power supplied by both the MPT and EH sources is not adjusted appropriately. To solve this problem, the power supplied by multiple sources should be estimated precisely. In this paper, we propose a scheme for estimating the power supplied by multiple sources on the basis of an existing MPT scheduling system and then conducted an experiment using the scheme. From the experimental results, it is confirmed to estimate the power supplied by multiple sources successfully. In addition, the required MPT duration when the EH source is used is reduced compared to that when it is not used. Moreover, it is confirmed that the sensor station successfully estimates the power supplied by an MPT source and that by an EH source and adequately configures the MPT duration

  20. The arc power supply for the TEXTOR neutral injectors

    International Nuclear Information System (INIS)

    Schwarz, U.; Pfister, U.; Goll, O.; Wurslin, R.; Scherer, J.; Haubmann, S.

    1986-01-01

    The 24 single arcs in the plasma source of the TEXTOR neutral injector are supplied with an overall current of 1800 A at an arc voltage of 150 V DC. The current is switched on and off in less than 1 msec. The paper presents a new modular solution for such a power supply. Each arc is powered by a separately switched mode supply module. One single module consists of a diode rectifier bridge with a filter, a fast semiconductor switch, an inductance in series for stabilizing the current and a free-wheeling path. The layout of this power supply system is described in detail based on test results. Design features and technical data are given

  1. TRACKING TESTS FOR THE SNS FAST INJECTION BUMP POWER SUPPLY

    International Nuclear Information System (INIS)

    ENG, W.; CUTLER, R.; DEWAN, S.

    2004-01-01

    The tracking requirement of the SNS Fast Injection Bump power supplies is described. In addition to the usual tracking between the load current and the input reference of a power supply, these power supplies must also track between pairs of units under slightly different loads. This paper describes the use of a current-null test to measure tracking performances. For the actual tests, a single dummy magnet load was used to measure the tracking between the first two production units at the manufacturer's facility. Using the Yokogawa WE7000 waveform. PC-based measurement instrument, input and output waveforms are digitized and stored in data files. A program written for this application is then used to extract data from these files to construct, analyze the waveforms and characterize the power supply performance. Results of the measurements of two SNS Fast Injection Bump power supplies will be presented in this paper

  2. Study of the power supply topology with high stability for accelerator

    International Nuclear Information System (INIS)

    Wu Wei; Wang Yunfang; Wang Jiewei

    2005-01-01

    The requirements of the power supply for accelerator are analyzed. A few of topologies of the highly stabilized power supply are discussed. The types are listed: Auto-transformers-diode rectifier-transistor regulating current. Thyristor rectifier regulating voltage -transistor regulating current, Diode rectifier -DC-chopping. Thyristor rectifier regulating voltage -two-quadrant-chopping. The advantages and disadvantages of the topologies for power supply are discussed. The notice questions of the power supply designed for accelerator are analyzed. (authors)

  3. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...

  4. Exploration of a radiation hardening stabilized voltage power supply

    International Nuclear Information System (INIS)

    Xie Zeyuan; Xu Xianguo

    2014-01-01

    This paper mainly introduces the design method of radiation hardening stabilized voltage power supply that makes use of commercial radiation resistant electronic devices and the test results of radiation performance of the power supply and devices are presented in detail. The experiment results show that the hardened power supply can normally work until 1000 Gy (Si) total dose and 1 × 10 14 n/cm 2 neutron radiation, and it doesn't latchup at about 1 × l0 9 Gy (Si)/s gamma transient dose rate. (authors)

  5. Efficient chaotic based satellite power supply subsystem

    International Nuclear Information System (INIS)

    Ramos Turci, Luiz Felipe; Macau, Elbert E.N.; Yoneyama, Takashi

    2009-01-01

    In this work, we investigate the use of the Dynamical System Theory to increase the efficiency of the satellite power supply subsystems. The core of a satellite power subsystem relies on its DC/DC converter. This is a very nonlinear system that presents a multitude of phenomena ranging from bifurcations, quasi-periodicity, chaos, coexistence of attractors, among others. The traditional power subsystem design techniques try to avoid these nonlinear phenomena so that it is possible to use linear system theory in small regions about the equilibrium points. Here, we show that more efficiency can be drawn from a power supply subsystem if the DC/DC converter operates in regions of high nonlinearity. In special, if it operates in a chaotic regime, is has an intrinsic sensitivity that can be exploited to efficiently drive the power subsystem over high ranges of power requests by using control of chaos techniques.

  6. Efficient chaotic based satellite power supply subsystem

    Energy Technology Data Exchange (ETDEWEB)

    Ramos Turci, Luiz Felipe [Technological Institute of Aeronautics (ITA), Sao Jose dos Campos, SP (Brazil)], E-mail: felipeturci@yahoo.com.br; Macau, Elbert E.N. [National Institute of Space Research (Inpe), Sao Jose dos Campos, SP (Brazil)], E-mail: elbert@lac.inpe.br; Yoneyama, Takashi [Technological Institute of Aeronautics (ITA), Sao Jose dos Campos, SP (Brazil)], E-mail: takashi@ita.br

    2009-10-15

    In this work, we investigate the use of the Dynamical System Theory to increase the efficiency of the satellite power supply subsystems. The core of a satellite power subsystem relies on its DC/DC converter. This is a very nonlinear system that presents a multitude of phenomena ranging from bifurcations, quasi-periodicity, chaos, coexistence of attractors, among others. The traditional power subsystem design techniques try to avoid these nonlinear phenomena so that it is possible to use linear system theory in small regions about the equilibrium points. Here, we show that more efficiency can be drawn from a power supply subsystem if the DC/DC converter operates in regions of high nonlinearity. In special, if it operates in a chaotic regime, is has an intrinsic sensitivity that can be exploited to efficiently drive the power subsystem over high ranges of power requests by using control of chaos techniques.

  7. Electrochemical Anti-corrosion System of Iron Tower Based on Solar Power Supply

    Directory of Open Access Journals (Sweden)

    Tian Tian

    2018-01-01

    Full Text Available Aiming at the serious problem of the corrosion of the transmission tower in the coastal area or in the harsh industrial area, a kind of electro-chemical anti-corrosion system based on solar power is designed. The system consists of a solar power module and an electrochemical anti-corrosion module: The solar power module consists of a solar panel, a photovoltaic controller, a accumulator and a constant potentiometer. The Electrochemical anti-corrosion modules include an anode block and an anode bed and reference electrode. The photovoltaic energy technology and forced current cathodic protection technology are used in the system, to achieve the effective protection of the tower anti-corrosion. Solar power supply to the nearest, solve the long-distance transmission loss and the high installation costs, form a simple structure, stable operation, low cost, clean and environmental protection, long service life of anti-corrosion system, with good economic efficiency and social benefits. It is of great significance to ensure the safe operation of the tower, maintain the normal operation of the power grid, and even promotes the optimization and upgrading of the industrial structure, save energy and reduces emissions, improve the safe and stable operation of the power system and the economic benefits, etc.

  8. Synchrotron power supply of TARN II

    International Nuclear Information System (INIS)

    Watanabe, Shin-ichi.

    1991-07-01

    The construction and performance of synchrotron power supply of TARN II are described. The 1.1 GeV synchrotron-cooler TARN II has been constructed at Institute for Nuclear Study, University of Tokyo. Constructed power supply for the dipole magnets is 600 V, 2500 A operated in the mode of trapezoid wave form with the repetition cycle of 0.1 Hz. The stability of magnetic field within 10 -3 and tracking error of 10 -4 have been attained with the aid of computer control system. First trial of synchrotron acceleration of He 2+ beam has been done up to 600 MeV in April, 1991. (author)

  9. An ultra low-power off-line APDM-based switchmode power supply with very high conversion efficiency

    DEFF Research Database (Denmark)

    Nielsen, Nils

    2001-01-01

    This article describes the results from the research work on design of a ultra low power off-line power supply with very high conversion efficiency. The input voltage is 230 VAC nominal and output voltage is 5 VDC. By ultra low power levels, an output power level in the area ranging from 50 m......W and up to 1000 mW is meant. The small power supply is intended for use as a standby power supply in mains operated equipment, which requires a small amount of power in standby mode....

  10. Development of compact rapid charging power supply for capacitive energy storage in pulsed power drivers.

    Science.gov (United States)

    Sharma, Surender Kumar; Shyam, Anurag

    2015-02-01

    High energy capacitor bank is used for primary electrical energy storage in pulsed power drivers. The capacitors used in these pulsed power drivers have low inductance, low internal resistance, and less dc life, so it has to be charged rapidly and immediately discharged into the load. A series resonant converter based 45 kV compact power supply is designed and developed for rapid charging of the capacitor bank with constant charging current up to 150 mA. It is short circuit proof, and zero current switching technique is used to commute the semiconductor switch. A high frequency resonant inverter switching at 10 kHz makes the overall size small and reduces the switching losses. The output current of the power supply is limited by constant on-time and variable frequency switching control technique. The power supply is tested by charging the 45 kV/1.67 μF and 15 kV/356 μF capacitor banks. It has charged the capacitor bank up to rated voltage with maximum charging current of 150 mA and the average charging rate of 3.4 kJ/s. The output current of the power supply is limited by reducing the switching frequency at 5 kHz, 3.3 kHz, and 1.7 kHz and tested with 45 kV/1.67 μF capacitor bank. The protection circuit is included in the power supply for over current, under voltage, and over temperature. The design details and the experimental testing results of the power supply for resonant current, output current, and voltage traces of the power supply with capacitive, resistive, and short circuited load are presented and discussed.

  11. A re-evaluation of nuclear plant offsite power supplies

    International Nuclear Information System (INIS)

    William E Berger; Robert E Henry

    2005-01-01

    Full text of publication follows: De-regulation of the electric power industry has resulted in separate ownership of the transmission and power generation facilities as well as a revised format for operating the transmission facilities. Currently we see the transfer of large blocks of bulk power between markets which can impact the voltage regulation at the offsite power supply. Where Nuclear Plant operations once knew with a large degree of certainty the operating range of the system supplying the offsite power supply, this may no longer be the case and more challenges to the safety systems could result. These challenges may manifest themselves as either a loss of offsite power or voltage levels approaching the degraded level setpoints. In this paper we will first explore what challenges are caused by deregulation and how they impact offsite power supply operations. Next we will incorporate the knowledge grained regarding accidents and consequences from the Individual Plant Evaluations (IPE's) to see how the offsite power supply could be operated to mitigate the challenges and extend the capacity of the auxiliary power system. Various scenarios will be examined using the Modular Accident Analysis Program (MAAP) as an integral plant model. MAAP simulations that include both the plant thermal hydraulic responses and corresponding electric power demand are presented to demonstrate the impact of alternate approaches to offsite power system operation. The original design phase of the offsite and onsite power distribution system was based on a criterion relating to the starting of all safety loads if a safety injection signal was present independent of the accident or its progression. The IPE and risk informed insights that are readily available today will be applied in the re-analyses of the offsite distribution system response. (authors)

  12. Safety of power transformers, power supplies, reactors and similar products - Part 1: General requirements and tests

    CERN Document Server

    International Electrotechnical Commission. Geneva

    1998-01-01

    This International Standard deals with safety aspects of power transformers, power supplies, reactors and similar products such as electrical, thermal and mechanical safety. This standard covers the following types of dry-type transformers, power supplies, including switch mode power supplies, and reactors, the windings of which may be encapsulated or non-encapsulated. It has the status of a group safety publication in accordance with IEC Guide 104.

  13. A Preliminary Analysis of the Economics of Using Distributed Energy as a Source of Reactive Power Supply

    Energy Technology Data Exchange (ETDEWEB)

    Li, Fangxing [ORNL; Kueck, John D [ORNL; Rizy, D Tom [ORNL; King, Thomas F [ORNL

    2006-04-01

    A major blackout affecting 50 million people in the Northeast United States, where insufficient reactive power supply was an issue, and an increased number of filings made to the Federal Energy Regulatory Commission by generators for reactive power has led to a closer look at reactive power supply and compensation. The Northeastern Massachusetts region is one such area where there is an insufficiency in reactive power compensation. Distributed energy due to its close proximity to loads seems to be a viable option for solving any present or future reactive power shortage problems. Industry experts believe that supplying reactive power from synchronized distributed energy sources can be 2 to 3 times more effective than providing reactive support in bulk from longer distances at the transmission or generation level. Several technology options are available to supply reactive power from distributed energy sources such as small generators, synchronous condensers, fuel cells or microturbines. In addition, simple payback analysis indicates that investments in DG to provide reactive power can be recouped in less than 5 years when capacity payments for providing reactive power are larger than $5,000/kVAR and the DG capital and installation costs are lower than $30/kVAR. However, the current institutional arrangements for reactive power compensation present a significant barrier to wider adoption of distributed energy as a source of reactive power. Furthermore, there is a significant difference between how generators and transmission owners/providers are compensated for reactive power supplied. The situation for distributed energy sources is even more difficult, as there are no arrangements to compensate independent DE owners interested in supplying reactive power to the grid other than those for very large IPPs. There are comparable functionality barriers as well, as these smaller devices do not have the control and communications requirements necessary for automatic

  14. Advanteges of using Two-Switch Forward in Single-Stage Power Factor Corrected Power Supplies

    DEFF Research Database (Denmark)

    Petersen, Lars

    2000-01-01

    A single-Stage power factor corrected power supply using a two-switch forward is proposed to increase efficiency. The converter is operated in the DCM (Discontinues Conduction Mode). This will insure the intermediate DC-bus to be controlled only by means of circuit parameters and therefore...... power supply has been implemented. The measured efficiency and power factor are about 87% and 0.96 respectively....

  15. Conceptual design and simulation of HL-2A RMP coils power supply

    International Nuclear Information System (INIS)

    Ren Qinghua; Wang Yingqiao; Li Qing

    2015-01-01

    The conceptual design and simulation of HL-2A resonant magnet perturbation (RMP) coils power supply are introduced, including its power supply topology, the selection of basic units and its control modes. The RMP coils will be energized by DC power supply with the amplitude up to 4 kA, or AC power supply with maximum amplitude up to 4 kA with adjustable frequency up to 1 kHz. Though choosing the sound power supply topology and its control modes, the RMP coils power supply can meet the requirements of both fast response and low current ripple to satisfy the ELM control and minimize adverse effects on plasma control as far as possible. (authors)

  16. Switched-mode power supply apparatus and method

    NARCIS (Netherlands)

    2013-01-01

    The present invention relates to a switched-mode power supply apparatus and a corresponding method. For an effective compensation of non-linearities caused by dead- time and voltage drops in the switching power amplifier of the apparatus, an apparatus is proposed comprising a switching power

  17. Switched-mode power supply apparatus and method

    NARCIS (Netherlands)

    2013-01-01

    The present invention relates to a switched-mode power supply apparatus and a corresponding method. For an effective compensation of non-linearities caused by dead-time and voltage drops in the switching power amplifier of the apparatus, an apparatus is proposed comprising a switching power

  18. Electric power supply in an offshore oil production platform | Ibe ...

    African Journals Online (AJOL)

    powered UPS system with a rotary engine UPS which can provide long-term power supply back-up as well as the benefits of rotating machines. KEY WORDS: Offshore, Platform, Power Supply, Gas turbine, Rotary Diesel UPS. [Global Jnl ...

  19. State-of-the-art piezoelectric transformer-based switch mode power supplies

    DEFF Research Database (Denmark)

    Ekhtiari, Marzieh; Zhang, Zhe; Andersen, Michael A. E.

    2014-01-01

    Inductorless switch mode power supplies based on piezoelectric transformers are used to replace conventional transformers in high power density switch mode power supplies. Even though piezoelectric-based converters exhibit a high d egree of nonlinearity, it is desirable to use piezoelectric transfo...... discusses power supplies with the trend evaluation of piezoelectric transformer-based converter topologies and control methods. The challenges of piezoelectric transformers regarding soft switching capability and nonlinearity are addressed. This paper can be used as a guideline f or choosing a proper...... topology of piezoelectric-based switch mode power supply and a control method for the required application....

  20. Model Design on Emergency Power Supply of Electric Vehicle

    Directory of Open Access Journals (Sweden)

    Yuanliang Zhao

    2017-01-01

    Full Text Available According to the mobile storage characteristic of electric vehicles, an emergency power supply model about the electric vehicles is presented through analyzing its storage characteristic. The model can ensure important consumer loss minimization during power failure or emergency and can make electric vehicles cost minimization about running, scheduling, and vindicating. In view of the random dispersion feature in one area, an emergency power supply scheme using the electric vehicles is designed based on the K-means algorithm. The purpose is to improve the electric vehicles initiative gathering ability and reduce the electric vehicles gathering time. The study can reduce the number of other emergency power supply equipment and improve the urban electricity reliability.

  1. Wind power installations in Switzerland - Regional planning basics and impact

    International Nuclear Information System (INIS)

    Ott, W.; Kaufmann, Y.; Steiner, P.; Gilgen, K.; Sartoris, A.

    2008-01-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  2. Reliability of the electric power supply in the safety apparatus of nuclear power plants: a comparative analysis

    International Nuclear Information System (INIS)

    Cruz, L.A.

    1992-01-01

    This paper discusses the risk of total loss of electric power supply to the Class 1E system. Two alternatives are focused: a system with two off-site and two onsite power supplies emergency power supply, as recommended by the American Regulations, and a system with only one off-site and four on-site power supplies, applicable when two off-site are not available. To allow the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability of a simultaneous failure of all power sources. The sensitivity of each parameter is studied in each case and, on the basis of the results of the study, the author conclude that the system with two off-site power supplies is preferable in all alternatives analysed, although the system with one off-site power supply can be adopted with high reliability diesel-generators. (author)

  3. Impacts of Power Structure on Sustainable Supply Chain Management

    Directory of Open Access Journals (Sweden)

    Zhi Li

    2017-12-01

    Full Text Available The present paper examines the manufacturer’s operational decisions, e.g., wholesale price and product sustainability level, the retailer’s operational decision, e.g., retail margin, and supply chain efficiency under three supply chain power structures: manufacturer Stackelberg, Nash and retailer Stackelberg. As a benchmark, we first obtain the equlibrium price and product sustainability level in a vertically integrated supply chain. Our analysis provides some interesting findings in a decentralized supply chain: (i a dominant manufacturer (retailer always benefits from its power; (ii the entire supply chain earns the most profit from the Nash game, and the least from the retailer Stackelberg game, respectively; (iii as the power shifts from the manufacturer to the retailer, product sustainability and retail price increase; (iv dominant manufacturer does not necessarily imply low wholesale price that would benefit the retailer. Managerial insights are provided for the manufacturer and the retailer, respectively.

  4. The best-mix of power demand and supply. Energy system integration

    International Nuclear Information System (INIS)

    Ogimoto, Kazuhiko

    2012-01-01

    In September 2012 after nationwide discussions, Energy and Environmental Council decided 'Innovative Strategy for Energy and the Environment': (1) Realization of a society not dependent on nuclear power, (2) Realization of green energy revolution, (3) For ensuring stable supply of energy, (4) Bold implementation of reform of electricity power systems and (5) Steady implementation of global warming countermeasures. Energy problem should be considered as supply and demand of whole energy. However, long-term energy problem such as in 2050 should assume global limits of fossil fuel supply and carbon dioxide emission and then in order to realize sustainable demand and supply of energy, maximum deployment of renewable energy power in primary energy and most practicable electrification of final demand for energy conservation should be implemented. Best mix of power and energy demand and supply would be significant to some extent. This article outlined analysis of power demand and supply in a long term, future power technologies and demand side management, and problems of power system operation and their solution, and then described energy system integration to realize power and energy/society best mix. (T. Tanaka)

  5. High voltage power supplies for ITER RF heating and current drive systems

    International Nuclear Information System (INIS)

    Gassmann, T.; Arambhadiya, B.; Beaumont, B.; Baruah, U.K.; Bonicelli, T.; Darbos, C.; Purohit, D.; Decamps, H.; Albajar, F.; Gandini, F.; Henderson, M.; Kazarian, F.; Lamalle, P.U.; Omori, T.; Parmar, D.; Patel, A.; Rathi, D.; Singh, N.P.

    2011-01-01

    The RF heating and current drive (H and CD) systems to be installed for the ITER fusion machine are the electron cyclotron (EC), ion cyclotron (IC) and, although not in the first phase of the project, lower hybrid (LH). These systems require high voltage, high current power supplies (HVPS) in CW operation. These HVPS should deliver around 50 MW electrical power to each of the RF H and CD systems with stringent requirements in terms of accuracy, voltage ripple, response time, turn off time and fault energy. The PSM (Pulse Step Modulation) technology has demonstrated over the past 20 years its ability to fulfill these requirements in many industrial facilities and other fusion reactors and has therefore been chosen as reference design for the IC and EC HVPS systems. This paper describes the technical specifications, including interfaces, the resulting constraints on the design, the conceptual design proposed for ITER EC and IC HVPS systems and the current status.

  6. Performance of different types of renewable power supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Al-Motawakel, M K [Sana' a Univ. (Republic of Yemen). Dept. of Physics; Abu-El-Eizz, H M; Awwad, Z [Zagazig Univ. (EG). Dept. of Physics

    1991-10-01

    In this paper we investigate the performance of a hybrid Photovoltaic (PV)-Wind generator power supply system operating under good and fair insolation and wind regimes. The effectiveness of such a hybrid system is measured by the Relative Sizing Parameter (RSP), Money Saving Parameter (MSP), and the Overall Reliability Parameter (ORP). Under specified weather conditions and for a nominal load demand, the RSP relates the product of the PV-modules and storage batteries involved in sizing the PV-Wind hybrid system to those of a stand alone PV-system sized to meet the same load. The MSP reports the difference between the total costs of a stand-alone PV power supply system and a hybrid PV-Wind power supply system, both sized to meet the same load, as a percentage of the total costs involved in supplying the load with a stand-alone PV power supply system only. The ORP compares the yearly average of the daily excess energy (positive difference between generated and consumed energy) of the hybrid system to that of the stand-alone PV power system. Based on this strategy we were able to develop a number of design diagrams which can be used in judging the benefits of utilizing hybrid PW-Wind generators on both economic and energy reliability grounds. (author).

  7. Dynamic Analysis & Characterization of Conventional Hydraulic Power Supply Units

    DEFF Research Database (Denmark)

    Schmidt, Lasse; Liedhegener, Michael; Bech, Michael Møller

    2016-01-01

    Hydraulic power units operated as constant supply pres-sure systems remain to be widely used in the industry, to supply valve controlled hydraulic drives etc., where the hydraulic power units are constituted by variable pumps with mechanical outlet pressure control, driven by induction motors....... In the analysis of supplied drives, both linear and rotary, emphasis is commonly placed on the drives themselves and the related loads, and the supply system dynamics is often given only little attention, and usually neglected or taken into account in a simplified fashion. The simplified supply system dynamics...... and drives will reduce the flow-to-pressure gain of the supply system, and hence increase the time constant of the sup-ply pressure dynamics. A consequence of this may be large vari-ations in the supply pressure, hence large variations in the pump shaft torque, and thereby the induction motor load torque...

  8. Tactical supply chain planning for a forest biomass power plant under supply uncertainty

    International Nuclear Information System (INIS)

    Shabani, Nazanin; Sowlati, Taraneh; Ouhimmou, Mustapha; Rönnqvist, Mikael

    2014-01-01

    Uncertainty in biomass supply is a critical issue that needs to be considered in the production planning of bioenergy plants. Incorporating uncertainty in supply chain planning models provides improved and stable solutions. In this paper, we first reformulate a previously developed non-linear programming model for optimization of a forest biomass power plant supply chain into a linear programming model. The developed model is a multi-period tactical-level production planning problem and considers the supply and storage of forest biomass as well as the production of electricity. It has a one-year planning horizon with monthly time steps. Next, in order to incorporate uncertainty in monthly available biomass into the planning, we develop a two-stage stochastic programming model. Finally, to balance the risk and profit, we propose a bi-objective model. The results show that uncertainty in availability of biomass has an additional cost of $0.4 million for the power plant. Using the proposed stochastic optimization model could reduce this cost by half. - Highlights: • Developed a two-stage stochastic optimization model to consider supply uncertainty. • Maximized the profit of a forest biomass power plant value chain. • Minimized two risk measures, variability index and downside risk, to manage risks. • Stochastic optimization model provided feasible solution for all scenarios. • Results showed a trade-off between profit and risk management

  9. ASCERTAINMENT OF ELECTRIC-SUPPLY SCHEMES RELIABILITY FOR THE ATOMIC POWER PLANT AUXILIARIES

    Directory of Open Access Journals (Sweden)

    A. L. Starzhinskij

    2015-01-01

    Full Text Available The paper completes ascertainment of electrical-supply scheme reliability for the auxiliaries of a nuclear power plant. Thereat the author considers the system behavior during the block normal operation, carrying out current maintenance, and capital repairs in combination with initiating events. The initiating events for reactors include complete blackout, i.e. the loss of outside power supply (normal and reserve; emergency switching one of the working turbogenerators; momentary dumping the normal rating to the level of auxiliaries with seating the cutout valve of one turbo-generator. The combination of any initiating event with the repairing mode in case of one of the system elements failure should not lead to blackout occurrence of more than one system of the reliable power supply. This requirement rests content with the help of the reliable power supply system self-dependence (electrical and functional and the emergency power-supply operational autonomy (diesel generator and accumulator batteries.The reliability indicators of the power supply system for the nuclear power plant auxiliaries are the conditional probabilities of conjoined blackout of one, two, and three sections of the reliable power supply conditional upon an initiating event emerging and the blackout of one, two, and three reliable power-supply sections under the normal operational mode. Furthermore, they also are the blackout periodicity of one and conjointly two, three, and four sections of normal operation under the block normal operational mode. It is established that the blackout of one bus section of normal operation and one section of reliable power-supply system of the auxiliaries that does not lead to complete blackout of the plant auxiliaries may occur once in three years. The probability of simultaneous power failure of two or three normal-operation sections and of two reliable power-supply sections during the power plant service life is unlikely.

  10. APS power supply controls

    International Nuclear Information System (INIS)

    Saunders, C.W.; Despe, O.D.

    1994-01-01

    The purpose of this document is to provide comprehensive coverage of the APS power supply control design. This includes application software, embedded controller software, networks, and hardware. The basic components will be introduced first, followed by the requirements driving the overall design. Subsequent sections will address each component of the design one by one. Latter sections will address specific applications

  11. Uranium supply of the Swiss nuclear power plants

    International Nuclear Information System (INIS)

    Clausen, A.

    1991-01-01

    Securing the supply to Swiss nuclear power stations takes into account the fact that finished fuel elements must be introduced. The situation is, however, relieved by the fact there are excess capacities both in the amount of natural uranium available as well as in all processing stages. As further security, each nuclear power station keeps a reload of fuel elements in stock, so that if supplies are disrupted, continued operation is guaranteed for 1-2 years. Political influences should be taken into account, as should any repercussions that fuel disposal may have on fuel supply. 3 figs

  12. Troubleshooting of Modulator DC power supply at KOMAC

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Hae Seong; Kim, Han Sung; Kwon, Hyeok Jung; Kim, Seong Gu; Kim, Dae Il; Lee, Seok Geun; Kim, Jae Ha; Seol, Kyeong Tae; Cho, Yong Sub [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The process of solving problems to operate the 2nd converter modulator will be introduced. Also, the PSpice simulation result about the 12-pulse rectifier will be compared with the measurement result. KOMAC (KOrea Multi-purpose Accelerator Complex) has four HVCMs (High Voltage Converter Modulator) which are the power source of nine klystrons. Four HVCMs are already operated since 2013 for operating the 100 MeV linear proton accelerator at KOMAC. This HVCM system includes the 12-pulse rectifier (ac-dc), capacitors bank (dc-link, Pos, Neg) and converter modulator (dc-dc). Especially, the 12-pulse rectifier system receives the power from the utility and converts 3,300 ac voltage to 2,200 dc voltage for supplying the dc power to the capacitors bank. This rectifier system used twelve thyristors for the rectification and applied RC snubber networks to protect the semiconductor switches (thyristors). Since the 2nd modulator dc power supply has troubled, the troubleshooting process conducted by the staves of KOMAC. It takes 3 months to solve the problems because it is not easy to find the faulty wiring. Nevertheless, our staves found the faulty point with a hope to operate the modulator system and the PSpice simulation helps to solve the problems. Using PSpice which is tool for simulating the circuit, the dc power supply abnormal phenomenon was simulated exactly. After corrected the faulty wiring, the modulator dc power supply operated.

  13. Thyristor crowbar system for the high current power supplies of ASDEX upgrade

    International Nuclear Information System (INIS)

    Kaesemann, C.-P.; Lieshout, L. van; Huart, M.; Sihler, C.

    2005-01-01

    The ohmic heating system and the poloidal field coils of ASDEX upgrade are supplied by 15 thyristor converter units with an installed apparent power of 600 MVA. To protect the thyristor converters against dc overvoltage arising from abnormal operations and resulting damages caused by the large energy stored in the AUG magnet coils an overvoltage protection system was required. The paper describes the motivation for-and the design and testing of the thyristor crowbar system representing the thyristor converter overvoltage protection system. It will present the layout, analyse the results of measurements obtained during commissioning, compare them to the calculated (design) values and report on the first experience of operation on the AUG coils improving the safety of the equipment

  14. Complementary safety evaluation of the Phenix power station (INB n 71) in the light of the Fukushima power station accident

    International Nuclear Information System (INIS)

    2011-01-01

    This report proposes a complementary safety evaluation of the Phenix power station, one of the French basic nuclear installations (BNI, in French INB) in the light of the Fukushima accident. This evaluation takes the following risks into account: risks of flooding, earthquake, loss of power supply and loss of cooling, in addition to operational management of accident situations. It presents some characteristics of the Phenix installation (location, operator, industrial environment, installation characteristics), identifies the risks of cliff effect and the main structures and equipment, evaluates the seismic risk (installation sizing, installation conformity, margin evaluation), evaluates the flooding risk (installation sizing, installation conformity, margin evaluation), briefly examines other extreme natural phenomena (extreme meteorological conditions related to flooding, earthquake or flooding with a higher level than that for which the installation is designed). It analyzes the risk of a loss of power supply and of cooling (loss of external and internal electric sources, loss of the ultimate cooling system). It analyzes the management of severe accidents: crisis management organization, available intervention means, robustness of available means. It discusses the conditions of the use of subcontractors

  15. Power supply control system for experimental physical facilities

    International Nuclear Information System (INIS)

    Zelepukin, S.A.; Osipov, Eh.V.; Petrov, V.S.; Sergeev, V.A.; Uglekov, V.Ya.

    1979-01-01

    A multichannel (to 1024 channels) system for control of power supply voltage is descrited. The system consists of an analog commulator, a digital voltmeter and a special controller. The controller serves at the same time as an interface for connecting the system as a ''unit'' of the VECTOR and SUMMA unified electronic systems. The system has been realized for control of the photomultiplier power supply voltage of the MARK multipurpose experimental device (256 channels, the measurement accuracy is 0.2%, the measuring time is 500 ms per point). Software devised for the HP-2100 computer permits automatical comparison of photomultiplier power supply voltages with sample ones in the mode of continuous control of a single voltage or in the mode of programmed selection of voltages to provide the control in arbitrary order or automatic scanning

  16. Legal bases for the installation of nuclear power plants

    International Nuclear Information System (INIS)

    Faria, N.M. de; Barros, E.A.

    1980-01-01

    The role of the National Nuclear Energy Comission, the National Department of Water and Electrical Energy and the 'Centrais Eletricas Brasileiras S.A.' for the installation of Nuclear Power Plants is presented. (A.L.) [pt

  17. Frequency-domain analysis of resonant-type ring magnet power supplies

    International Nuclear Information System (INIS)

    Kim, J.M.S.; Reiniger, K.W.

    1993-01-01

    For fast-cycling synchrotrons, resonant-type ring magnet power supplies are commonly used to provide a dc-biased ac excitation for the ring magnets. Up to the present, this power supply system has been analyzed using simplified analytical approximation, namely assuming the resonant frequency of the ring magnet network is fixed and equal to the accelerator frequency. This paper presents a frequency-domain analysis technique for a more accurate analysis of resonant-type ring magnet power supplies. This approach identifies that, with the variation of the resonant frequency, the operating conditions of the power supply changes quite dramatically because of the high Q value of the resonant network. The analytical results are verified, using both experimental results and simulation results

  18. Future view of electric power information processing techniques. Architecture techniques for power supply communication network

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, Keisuke

    1988-06-20

    Present situations of a power supply communication are described, and the future trend of a power supply information network is reviewed. For the improvement of a transmission efficiency and quality and a cost benefit for the power supply communication, the introduction of digital networks has been promoted. As for a protection information network, since there is the difference between a required communication quality of system protection information and that of power supply operation information, the individual digital network configuration is expected, in addition, the increasing of image information transmission for monitoring is also estimated. As for a business information network, the construction of a broad-band switched network is expected with increasing of image transmission needs such as a television meeting. Furthermore, the expansion to a power supply ISDN which is possible to connect between a telephone, facsimile and data terminal, to exchange various media and to connect between networks is expected with higher communication services in the protection and business network. However, for its practical use, the standardization of various interfaces will become essential. (3 figs, 1 tab)

  19. Application of MATLAB in testing digital power supply controllers

    International Nuclear Information System (INIS)

    Ke Xinhua; Chinese Academy of Sciences, Beijing; Lu Songlin; Shen Tianjian

    2008-01-01

    Based on introducing MATLAB SISOTOOL in MATLAB control box and the magnet power supply system in detail, this paper presented the application of MATLAB SISOTOOL in Testing Digital Power Supply controllers. This control tool should be popularized because of its characteristics of convenience and easy-to-use. (authors)

  20. Klystron bias power supplies for Indus-2 synchrotron radiation source

    International Nuclear Information System (INIS)

    Badapanda, M.K.; Hannurkar, P.R.

    2008-01-01

    The functioning of an alternating current (AC) voltage regulator based high voltage direct current (HVDC) power supplies with better input and output performances has been presented in this paper. The authors have incorporated a 3-phase series limiting inductor, along with detuned passive filter in each power supply, to take care of line harmonics and the input power factor (IPF), which is simple, cost effective, reliable and provides input performance matching that of an equivalent active filter. Such arrangement has special significance for controlled HVDC power supplies supplying to fixed load but operated from widely varying input voltages. It achieves line voltage total harmonic distortion (THD) below 4% and IPF better than 0.97, for 415 V - 30% to 415 V + 10% variations in 3-phase input voltages. A properly designed crowbar, along with suitable limiting elements, is incorporated in each power supply and stringent wire survivability tests were carried out to limit klystron fault energy below 10 Joules. Several simulated waveforms and experiment results are also presented. (author)

  1. Dual voltage power supply with 48 volt

    Energy Technology Data Exchange (ETDEWEB)

    Froeschl, Joachim; Proebstle, Hartmut; Sirch, Ottmar [BMW Group, Muenchen (Germany)

    2012-11-01

    Automotive electrics/electronics have just reached a period of tremendous change. High voltage systems for Hybrid, Plug-In Hybrid or Battery Electric Vehicles with high power electric motors, high energy accumulators and electric climate compressors will be introduced in order to achieve the challenging targets for CO{sub 2} emissions and energy efficiency and to anticipate the mobility of the future. Additionally, innovations and the continuous increase of functionality for comfort, safety, driver assistance and infotainment systems require more and more electrical power of the vehicle power supply at all. On the one hand side electrified vehicles will certainly achieve a significant market share, on the other hand side they will increase the pressure to conventional vehicles with combustion engines for fuel consumption and CO{sub 2} emissions. These vehicles will be enabled to keep their competitiveness by new functions and the optimization of their electric systems. A dual voltage power supply with 48 Volt and 12 Volt will be one of the key technologies to realize these requirements. The power capability of the existing 12 Volt power supply has reached its limits. Further potentials can only be admitted by the introduction of 48 Volt. For this reason the car manufacturers Audi, BMW, Daimler, Porsche and Volkswagen started very early on this item and developed a common specification of the new voltage range. Now, it is necessary to identify the probable systems at this voltage range and to start the developments. (orig.)

  2. Development of rapid detection system on BEPC Ⅱ magnet power supply

    International Nuclear Information System (INIS)

    Chen Suying; Zhan Mingchuan; Long Fengli; Ye Weidong

    2014-01-01

    To quickly find the causes of the accelerator unstable or lost beam caused by magnet power supply in Beijing Electron Positron Collider (BEPC Ⅱ) running, the rapid detection system for magnet power supply was developed. The stability of the system in 8 h is about 0.005%, and it can acquire over nearly 500 sets of magnet power supply current values most quickly in 0.33 ms. All data were written to the MySQL database in real time, so as to be able to quickly troubleshoot magnet power supply problem through historical data analysis and comparison. (authors)

  3. Improvement of ionizer and power supply of 860 A sputtering negative ion source

    International Nuclear Information System (INIS)

    An Kun; Yu Lingda; Wu Bingbing; Wang Guangfu

    2014-01-01

    A transmission surface type ionizer was developed with a φ2.5 mm stainless steel sheath core heating cable, and the ion source power supply was also improved. A continuous adjustable DC switching power supply was employed instead of the original AC power supply as the ionizer power supply, and a 0 - -20 kV DC power supply at the ground potential as the power of the immersion lens replaced the original 10 kV DC power supply suspended in -20 kV. The variation of the beam intensity of H"- in the front Faraday cup of the GIC4117 2 × 1.7 MV tandetron with the ionizer heating current was also shown. (authors)

  4. Mounting and performance measurements of a PV array addition to an existing small wind-power installation for greenhouse electric supply in Patagonia

    Directory of Open Access Journals (Sweden)

    Rafael Oliva

    2016-08-01

    Full Text Available A small wind-power system intended for electric supply of a research greenhouse at the local University facilities in San Julian region incorporates a photovoltaic (PV array and regulator, which is described in this report together with its data-acquisition system. The main application is control and lighting. The Alternative Energy Group at the University seeks through this project to acquire knowledge and practical experience in the combination of renewable energy sources for optimal electrical supply of isolated systems, their associated measurements and processing of resulting data

  5. Saturable reactor-controlled power supply system for TCT/TFTR neutral beam sources

    International Nuclear Information System (INIS)

    Baker, W.R.; Hopkins, D.B.; Dexter, W.L.; Kuenning, R.W.; Smith, B.J.

    1975-11-01

    Each neutral beam source requires one major power supply, the acceleration supply, and four auxiliary power supplies. The power supplies are designed to permit independent interruption of current to any source and crowbarring within 20 μsec, in the event of a source spark, while not disturbing the normal pulsing of all other adjacent sources. The sources are described

  6. Climate adaptation in power supply - status; Klimatilpasning i kraftforsyningen - statusrapport

    Energy Technology Data Exchange (ETDEWEB)

    Steen, Roger

    2009-12-15

    A survey of the now-status in the power supply when it comes to understanding possible climatic effects of power supply, the need for climate adaptation and motivation to adapt to climate change. (AG)

  7. Modular hot swappable 50 V, 700 A DC power supply with active redundancy

    International Nuclear Information System (INIS)

    Badapanda, M.K.; Upadhyay, R.; Tripathi, A.; Tyagi, R.K.; Lad, M.

    2015-01-01

    A 50 V, 700 A voltage regulated modular hot swappable DC power supply has been designed and developed to bias 32 numbers of 500 W, 505.8 MHz solid state RF amplifiers for Indus-2 RF system. This power supply employs 7 numbers of 50 V, 100 A power modules which are operated in parallel and share load current equally. Active redundancy with hot swappable features incorporated in this power supply isolates the faulty module and facilitates its online replacement without affecting the operation of RF amplifiers, thereby significantly reducing the down time of the overall system. Each power module has inbuilt harmonics and power factor correction stage to improve its input performance parameters. This power supply has a dedicated controller, which monitors the healthiness of 32 numbers of RF amplifiers and 7 numbers of power modules, controls the equal sharing of load current among these modules as well as isolates the faulty RF amplifiers and power modules. The control system allows the user to set the trip limits for bias current of individual RF amplifier, power module currents and total power supply current independently for effective protection of the overall system. Issues related to EMI and high frequency switching noises are suitably taken care of in this power supply. The crucial parameters of this power supply are displayed on a local LCD panel as well as on remote PC via ethernet communication. This paper compares the availability and reliability of this hot swappable power supply with the configuration involving one dedicated power supply for each RF amplifier. The performance parameters of this power supply tested with solid state RF amplifiers are also presented in this paper. (author)

  8. ENERGY STAR Certified Uninterruptible Power Supplies

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Uninterruptible Power Supplies that are...

  9. Transforming PC Power Supplies into Smart Car Battery Conditioners

    Science.gov (United States)

    Rodriguez-Ascariz, J. M.; Boquete-Vazquez, L.

    2011-01-01

    This paper describes a laboratory project consisting of a PC power supply modification into an intelligent car-battery conditioner with both wireless and wired networking capabilities. Adding a microcontroller to an average PC power supply transforms it into a flexible, intelligent device that can be configured and that is suitable to keep car…

  10. Summary of the electric power supply program for fiscal 1981

    International Nuclear Information System (INIS)

    Shimada, Minoru

    1981-01-01

    The plans of electric power supply for fiscal 1981 (from April, 1981, to March, 1982) by the power companies were formulated and submitted to the Ministry of International Trade and Industry. Along with the current up trend of economic activities, the demands of electric power will be on the increase. A summer peak of power consumption may rise all the more due to the increase in room-cooling units. On the other hand, the problem of petroleum is unsettled. Under the situation, the principal considerations behind the formulation of the plans are the effective utilization of other energy resources than oil and the suppression of oil-burning power generation, the economical usage of all power generation facilities and stabilized demand and supply, and the promotion of wide-area operation. The situation in fiscal 1981, power demands, power source facilities demand and supply balance, and the interchange of power among power companies are described. (J.P.N.)

  11. The requirements and specific features related to power supply in telecommunications of Ukraine

    Energy Technology Data Exchange (ETDEWEB)

    Lubashenko, T. [Inst. Giprosvijaz, Kiev (Ukraine); Gordon, A. [ProElectro Ltd., Kiev (Ukraine)

    2000-07-01

    The article deals with the description of trends of power supplies in the telecommunication sector. The basic normative documents regarding the design of the power supplies are pointed out. The requirements concerning the design of the power supplies are outlined. The peculiarities of the power supplies in Ukrainian telecommunications are given. (orig.)

  12. Regulations of local choices for installation of power reactors

    International Nuclear Information System (INIS)

    1969-09-01

    The present regulations specify the criteria under which the Comissao Nacional de Energia Nuclear will approve the local proposed for the installation of power reactors, according to his attributions established in the Law 4118, dated of August 27, 1962

  13. Legal bases for the installation of nuclear power plants

    International Nuclear Information System (INIS)

    Faria, N.M. de

    1980-06-01

    The process of installation of nuclear power plants in the context of the Brazilian legal system is analysed. The structure of the political and administrative system related to the matter and the correspondent legislation are discussed. (A.L.) [pt

  14. Seismic assessment of air-cooled type emergency electric power supply system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    JNES initiated seismic assessment programs to develop seismic review criterions for the air-cooled system (diesel generator, gas turbine generator), which will be newly installed for enhancing the diversity of emergency electric power supply system. Five principal subjects are involved in the programs: two subjects for fiscal 2011 and three ones for fiscal 2012 and 2013. The summary of outcomes is as follows: 1) Past capacity test data and related technical issues (2011). Seismic capacity data obtained from past seismic shaking tests were investigated. 2) Test programs based on the investigation of system specification (2011). Design specifications for the air-cooled system were investigated. 3) Large Air Fin Cooler (AFC) one unit model seismic capacity test and quantitative seismic capacity evaluation. AFC one unit model seismic capacity tests were conducted and quantitative seismic capacities were evaluated. (author)

  15. Seismic assessment of air-cooled type emergency electric power supply system

    International Nuclear Information System (INIS)

    2013-01-01

    JNES initiated seismic assessment programs to develop seismic review criterions for the air-cooled system (diesel generator, gas turbine generator), which will be newly installed for enhancing the diversity of emergency electric power supply system. Five principal subjects are involved in the programs: two subjects for fiscal 2011 and three ones for fiscal 2012 and 2013. The summary of outcomes is as follows: 1) Past capacity test data and related technical issues (2011). Seismic capacity data obtained from past seismic shaking tests were investigated. 2) Test programs based on the investigation of system specification (2011). Design specifications for the air-cooled system were investigated. 3) Large Air Fin Cooler (AFC) one unit model seismic capacity test and quantitative seismic capacity evaluation. AFC one unit model seismic capacity tests were conducted and quantitative seismic capacities were evaluated. (author)

  16. 47 CFR 80.268 - Technical requirements for radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... a visual indication whenever the transmitter is supplying power to the antenna. (4) Have a two-tone... between masts or other supports subject to whipping, a safety link must be installed which under heavy stress will reduce breakage of the antenna, the halyards, or any other supporting elements. (d) The...

  17. Market Design and Supply Security in Imperfect Power Markets

    DEFF Research Database (Denmark)

    Schwenen, Sebastian

    2014-01-01

    Supply security in imperfect power markets is modelled under different market designs. In a uniform price auction for electricity with two firms, strategic behaviour may leave firms offering too few capacities and unable to supply all realized demand. Market design that relies oncapacity markets...... increases available generation capacities for sufficiently high capacity prices and consequently decreases energy prices. However, equilibrium capacity prices are non-competitive. Capacity markets can increase security of supply, but cannot mitigate market power, which is exercised in the capacity market...

  18. Switched mode power supplies

    International Nuclear Information System (INIS)

    Verity, P.R.

    1984-01-01

    The power supply comprises an oscillator arranged to drive the primary winding of a transformer. A nuclear impulse detector is arranged to discontinue drive to the primary winding in response to detection of a nuclear impulse. The detector comprises a monostable circuit which has its state changed for a predetermined time by photocurrents induced in response to gamma radiation. In this changed state the detector disables the oscillator. (author)

  19. Comparison of Power Supply Pumping of Switch-Mode Audio Power Amplifiers with Resistive Loads and Loudspeakers as Loads

    DEFF Research Database (Denmark)

    Knott, Arnold; Petersen, Lars Press

    2013-01-01

    Power supply pumping is generated by switch-mode audio power amplifiers in half-bridge configuration, when they are driving energy back into their source. This leads in most designs to a rising rail voltage and can be destructive for either the decoupling capacitors, the rectifier diodes...... in the power supply or the power stage of the amplifier. Therefore precautions are taken by the amplifier and power supply designer to avoid those effects. Existing power supply pumping models are based on an ohmic load attached to the amplifier. This paper shows the analytical derivation of the resulting...... waveforms and extends the model to loudspeaker loads. Measurements verify, that the amount of supply pumping is reduced by a factor of 4 when comparing the nominal resistive load to a loudspeaker. A simplified and more accurate model is proposed and the influence of supply pumping on the audio performance...

  20. Development of the power supplies of the prototype ion source for the EAST

    International Nuclear Information System (INIS)

    Liu Zhimin; Hu Chundong; Liu Sheng; Jiang Caichao; Song Shihua; Xie Yahong; Sheng Peng

    2011-01-01

    For the neutral beam injector (NBI) of the Experimental Advanced Superconducting Tokamak (EAST), a test stand of a high-current ion source has been in construction. The NBI power supply system includes the plasma generator power supply, plasma electrode power supply, high voltage power divider, negative high voltage power supply, and the transmission lines and the snubber. A multi-megawatt prototype ion source was developed. The arc discharge of the prototype ion source was obtained in the test. The test results for the ion source power supplies and the arc discharge of the ion source are presented. (authors)

  1. Magnet power supplies for the Advanced Light Source

    International Nuclear Information System (INIS)

    Jackson, L.T.; Lutz, I.C.

    1989-03-01

    The Lawrence Berkeley Laboratory (LBL) is building an Advanced Light Source (ALS) to produce synchrotron radiation. An electron linear accelerator, and a booster synchrotron are used to accelerate the electron beam to 1.5 GeV to fill the storage ring. This paper describes the power supplies used for the magnets in the booster and the storage ring and the interface requirements for computer control and monitoring the power supplies and magnet currents. 1 ref., 3 figs., 2 tabs

  2. MANAGING THE LOAD SCHEDULE OF THE ADMINISTRATIVE BUILDING TAKING INTO ACCOUNT EMERGING RISKS WHEN CONNECTING THE KINETIC ENERGY STORAGE TO THE POWER SUPPLY SYSTEM

    Directory of Open Access Journals (Sweden)

    S. Yu. Shevchenko

    2017-12-01

    Full Text Available Purpose. The purpose of the paper is to analyze load schedules of the administrative building and develop a structural scheme for connecting the kinetic energy storage in the power supply system of this building, which will allow using it as a consumer regulator, as well as a theoretical study of the risks that arise. Methodology. To conduct the research, the theory of designing internal electrical networks of buildings, the theory of plotting electric load graphs, methods of the theory of electromechanical systems and for analyzing the risk system, the T. Saati method of hierarchies were used. Results. The structure of kinetic energy storage (KES connection to the power supply system of the administrative building is developed and the structural diagram of the KES proposed for installation is given, the average daily winter and summer load schedules are presented, a set of groups and subgroups of risks and their influence on the work of the power supply system of the building are connected with the connection of the KES. Originality. For the first time, the application of the kinetic energy storage in the power supply system of the building with the analysis of emerging risks is considered, which makes it possible to improve the reliability of the developed system and the efficiency of load regulation. Practical value. The application of the proposed scheme will make it possible to use administrative buildings as load regulators of the external power supply system, and also effectively manage the load in the internal power supply system of the building.

  3. Optimized Envelope Tracking Power Supply for Tetra2 Base Station RF Power Amplifier

    DEFF Research Database (Denmark)

    Høyerby, Mikkel Christian Wendelboe; Andersen, Michael Andreas E.

    2008-01-01

    An ultra-fast tracking power supply (UFTPS) for envelope tracking in a 50kHz 64-QAM Tetra2 base station power amplification system is demonstrated. A simple method for optimizing the step response of the PID+PD sliding-mode control system is presented and demonstrated, along with a PLL-based scheme...... application. Also demonstrated is the effect of non-zero UFTPS output impedance on envelope tracking performance. At 13W average (156W peak) RF output, a reduction of DC input power consumption from 93W (14% efficiency) to 54W (24% efficiency) is obtained by moving from a fixed RF power amplifier supply...

  4. NASA Ames Research Center 60 MW Power Supply Modernization

    Science.gov (United States)

    Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)

    2001-01-01

    The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.

  5. Proposal for the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (NL) â?" SEMER (FR), the lowest bidder, for the supply, installation, commissioning and maintenance for five years of the LHC access safety system for a total amount of 891 423 euros (1 367 633 Swiss francs), subject to revision for inflation for the maintenance of the system from 1 January 2007, with an option for the supply of safety PLCs for a total amount of 894 951 euros (1 373 046 Swiss francs), not subject to revision, bringing the total amount to 1 786 374 euros (2 740 679 CHF).The rate of exchange used is that stipulated in the tender.

  6. Survey, design, development, and installation of micro hydel power generation

    International Nuclear Information System (INIS)

    Ijaz, M.

    2011-01-01

    This paper presents the survey, design, development and installation Of micro hydel power generation using low head Kaplan water turbine. Electricity production from hydro power has been and still is today, the first renewable source used to generate electricity. The development of energy from renewable is very important step in reduction of carbon emissions(CO/sub 2/).

  7. Advanced power supply and distribution systems for Columbus

    Science.gov (United States)

    Eggers, Gert

    1988-01-01

    The paper describes power supply and distribution systems to be used on unmanned/man-tended Columbus elements, capable of supplying 10 kW to 30 kW to a variety of users in low earth orbits (LEO's). For the definition of the Electrical Power System (EPS) challenging requirements as the provision of high power levels under hard LEO conditions, maintainability, commonality etc. are to be taken into account. These requirements are to be seen in conjunction with the Columbus IOC (initial operational capability) scenario stipulating that EPS hardware shall be used on the Polar Platform, the Pressurized Module attached to the U.S. Space Station and the Man-Tended Free Flier. According to the availability of European technologies, the baseline in the power generation area is a photovoltaic system which provides three regulated main buses (150 V d.c.) to the users. In order to maintain power supply during eclipse phases, nickel hydrogen batteries will be used for energy storage purposes with nickel cadmium as back-up solution. The power distribution system needs special attention. Due to the elevated voltage levels mechanical switch gear cannot be used any longer. It is to be replaced by solid state power controllers (SSPC). Because these devices show a totally different behaviour with regard to conventional relay contacts, new approaches in the area of switching and protection are necessary. In view of the crucial role of this new technology for the realization of medium voltage d.c. systems, it is of great importance for Columbus and, hence will receive adequate consideration in the paper. In order to cater for effective management and control of the power supply and distribution hardware, a so called power system internal data processing assembly (PINDAP) has been introduced in the EPS. PINDAP is the key to reduced dependence on ground stations (alleviated ground support requirements); it keeps crew involvement in the EPS control process to as minimum and provides

  8. Large power supply facilities for fusion research

    International Nuclear Information System (INIS)

    Miyahara, Akira; Yamamoto, Mitsuyoshi.

    1976-01-01

    The authors had opportunities to manufacture and to operate two power supply facilities, that is, 125MVA computer controlled AC generator with a fly wheel for JIPP-T-2 stellerator in Institute of Plasma Physics, Nagoya University and 3MW trial superconductive homopolar DC generator to the Japan Society for Promotion of Machine Industry. The 125MVA fly-wheel generator can feed both 60MW (6kV x 10kA) DC power for toroidal coils and 20MW (0.5kV x 40kA) DC power for helical coils. The characteristic features are possibility of Bung-Bung control based on Pontrjagin's maximum principle, constant current control or constant voltage control for load coils, and cpu control for routine operation. The 3MW (150V-20000A) homopolar generator is the largest in the world as superconductive one, however, this capacity is not enough for nuclear fusion research. The problems of power supply facilities for large Tokamak devices are discussed

  9. On-chip digital power supply control for system-on-chip applications

    NARCIS (Netherlands)

    Meijer, M.; Pineda de Gyvez, J.; Otten, R.H.J.M.

    2005-01-01

    The authors presented an on-chip, fully-digital, power-supply control system. The scheme consists of two independent control loops that regulate power supply variations due to semiconductor process spread, temperature, and chip's workload. Smart power-switches working as linear voltage regulators

  10. Railway power supply - free of crises and independent

    International Nuclear Information System (INIS)

    Weigert, E.

    1981-01-01

    The German Federal Railway realizes 84% of its transport performance by electric traction. The prevailing primary energy source of the railway electric power supply is coal, but the DB uses also furnace gas, nuclear energy and hydroelectric power. The shave of mineral oil lies by about 5%. The public utilities deliver about 15%. The dispersed situation of the power stations and converter stations over the whole supply area offers the advantage of short transport distances. Therefore the 110-kV-railway mains especially meets distribution demands. Very useful is the compound operation with the Austrian Federal Railways and the Swiss Federal Railways. (orig.) [de

  11. Superconducting synchrotron power supply and quench protection scheme

    International Nuclear Information System (INIS)

    Stiening, R.; Flora, R.; Lauckner, R.; Tool, G.

    1978-01-01

    The power supply and quench protection scheme for the proposed Fermilab 6 km circumference superconducting synchrotron is described. Specifically, the following points are discussed: (1) the 46 MW thyristor power supply; (2) the 3 x 10 8 J emergency energy dump; (3) the distributed microprocessing system for the detection of quenches; (4) the thyristor network for shunting current around quenched magnets; and (5) the heaters internal to the magnets which cause rapid propagation of quenches. Test results on prototype systems are given

  12. Power quality assessment

    International Nuclear Information System (INIS)

    Fathi, H.M.E.

    2012-01-01

    The electrical power systems are exposed to different types of power quality disturbances problems. Assessment of power quality is necessary for maintaining accurate operation of sensitive equipment's especially for nuclear installations, it also ensures that unnecessary energy losses in a power system are kept at a minimum which lead to more profits. With advanced in technology growing of industrial / commercial facilities in many region. Power quality problems have been a major concern among engineers; particularly in an industrial environment, where there are many large-scale type of equipment. Thus, it would be useful to investigate and mitigate the power quality problems. Assessment of Power quality requires the identification of any anomalous behavior on a power system, which adversely affects the normal operation of electrical or electronic equipment. The choice of monitoring equipment in a survey is also important to ascertain a solution to these power quality problems. A power quality assessment involves gathering data resources; analyzing the data (with reference to power quality standards); then, if problems exist, recommendation of mitigation techniques must be considered. The main objective of the present work is to investigate and mitigate of power quality problems in nuclear installations. Normally electrical power is supplied to the installations via two sources to keep good reliability. Each source is designed to carry the full load. The Assessment of power quality was performed at the nuclear installations for both sources at different operation conditions. The thesis begins with a discussion of power quality definitions and the results of previous studies in power quality monitoring. The assessment determines that one source of electricity was deemed to have relatively good power quality; there were several disturbances, which exceeded the thresholds. Among of them are fifth harmonic, voltage swell, overvoltage and flicker. While the second

  13. Multilevel tracking power supply for switch-mode audio power amplifiers

    DEFF Research Database (Denmark)

    Iversen, Niels Elkjær; Lazarevic, Vladan; Vasic, Miroslav

    2018-01-01

    to the power supply in order to improve efficiency. A 100 W prototype system was designed. Measured results show that systems employing envelope tracking can improve system efficiency from 2% to 12%, i.e. a factor of 6. The temperature rise is strongly reduced, especially for the switching power MOSFETs where......Switch-mode technology is the common choice for high efficiency audio power amplifiers. The dynamic nature of real audio reduces efficiency as less continuous output power can be achieved. Based on methods used for RF amplifiers this paper proposes to employ envelope tracking techniques...

  14. Energy efficiency of computer power supply units - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Aebischer, B. [cepe - Centre for Energy Policy and Economics, Swiss Federal Institute of Technology Zuerich, Zuerich (Switzerland); Huser, H. [Encontrol GmbH, Niederrohrdorf (Switzerland)

    2002-11-15

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the efficiency of computer power supply units, which decreases rapidly during average computer use. The background and the purpose of the project are examined. The power supplies for personal computers are discussed and the testing arrangement used is described. Efficiency, power-factor and operating points of the units are examined. Potentials for improvement and measures to be taken are discussed. Also, action to be taken by those involved in the design and operation of such power units is proposed. Finally, recommendations for further work are made.

  15. JT-60SA power supply system

    International Nuclear Information System (INIS)

    Coletti, A.; Baulaigue, O.; Cara, P.; Coletti, R.; Ferro, A.; Gaio, E.; Matsukawa, M.; Novello, L.; Santinelli, M.; Shimada, K.; Starace, F.; Terakado, T.; Yamauchi, K.

    2011-01-01

    The paper describes the main features of the Superconducting Magnets Power Supply to generate the toroidal and poloidal magnetic fields in JT-60SA tokamak, with special regard to coil current regulation mode and magnets protection.

  16. A 220 MVA turbo-generator for the TCV tokamak power supplies

    International Nuclear Information System (INIS)

    Perez, A.; Canay, I.M.; Simond, J.-J.; Morf, J.-J; Pahud, J.-D; Seysen, R.

    1989-01-01

    A new 220 MVA, 120 Hz, 4 pole turbo-generator will be used as a pulsed power source to supply the toroidal and poloidal power supplies of the TCV tokamak, which is being built at the Ecole Polytechnique Federale de Lausanne in Switzerland. The paper describes the particular requirements of the TCV poloidal power supplies and the main electrical and mechanical features of the turbo-generator and its principal auxillaries. (author). 6 figs.; 1 tab

  17. Design and Implement of Low Ripple and Quasi-digital Power Supply

    Science.gov (United States)

    Xiangli, Li; Yanjun, Wei; Hanhong, Qi; Yan, Ma

    A switch linearity hybrid power supply based on single chip microcomputer is designed which merged the merits of the switching and linear power supply. Main circuit includes pre-regulator which works in switching mode and series regulator which works in linear mode. Two-stage regulation mode was adopted in the main circuit of the power. A single chip computer (SCM) and high resolution of series D/A and A/D converters are applied to control and measurement which achieved continuous adjustable and low ripple constant current or voltage power supply

  18. Post-installed concrete anchors in nuclear power plants: Performance and qualification

    International Nuclear Information System (INIS)

    Mahrenholtz, Philipp; Eligehausen, Rolf

    2015-01-01

    Graphical abstract: - Highlights: • Review of qualification and design regulations for anchors in nuclear power plants. • First complete set of nuclear anchor load–displacement data and its evaluation ever. • Demonstration of robust test behavior of a qualified post-installed anchor product. - Abstract: In nuclear power plants (NPPs), post-installed anchors are widely used for structural and non-structural connections to concrete. In many countries, anchor products employed for safety relevant applications have to be approved by the authorities. For the high safety standards in force for NPPs, special requirements have to be met to allow for extreme design situations. This paper presents an experimental test program conducted to evaluate the performance of anchors according to the German Guideline for Anchorages in Nuclear Power Plants and Nuclear Technology Installations (DIBt KKW Leitfaden, 2010). After a brief introduction to anchor behavior and the regulative context, the results of tension and shear tests carried out on undercut anchors are discussed. Robust load capacities and relatively small displacements determined for demanding load and crack cycling tests demonstrated the suitability of anchors qualified according to a state-of-the-art qualification guideline

  19. A new digital pulse power supply in heavy ion research facility in Lanzhou

    Science.gov (United States)

    Wang, Rongkun; Chen, Youxin; Huang, Yuzhen; Gao, Daqing; Zhou, Zhongzu; Yan, Huaihai; Zhao, Jiang; Shi, Chunfeng; Wu, Fengjun; Yan, Hongbin; Xia, Jiawen; Yuan, Youjin

    2013-11-01

    To meet the increasing requirements of the Heavy Ion Research Facility in Lanzhou-Cooler Storage Ring (HIRFL-CSR), a new digital pulse power supply, which employs multi-level converter, was designed. This power supply was applied with a multi H-bridge converters series-parallel connection topology. A new control model named digital power supply regulator system (DPSRS) was proposed, and a pulse power supply prototype based on DPSRS has been built and tested. The experimental results indicate that tracking error and ripple current meet the requirements of this design. The achievement of prototype provides a perfect model for HIRFL-CSR power supply system.

  20. A portable wireless data collection system by using optical power supply and photo-communication

    International Nuclear Information System (INIS)

    Nakajima, Toshiro; Shikai, Masahiro; Ikeda, Ikuo; Tochio, Atsushi

    1999-01-01

    For aiming at effective application to annual change management of patrolling inspection data and so forth, a portable wireless measuring and data collection device measurable to vibration, temperature and so forth automatically and for short time under patrolling of inspectors and collectable on sensor signals at many places, to collect field data as electronized data. This device was comprised of a sensor head to mount on an object apparatus to transmit sensor signals and a sensor terminal brought by an inspector and with functions to receive and memory a signal from the sensor head. It had a characteristics capable of wireless data collection using optical power supply and photo-communication where all of power supply to sensor head and transmission and receiving of data were conducted optically. As a result, some characteristics could be realized such as perfect realization of wireless data collection and reduction of maintenance burden without its need on installation of source, signal wire, and so forth, possibility to collect data for short time from distant place, and possibility to conduct high order treatment due to obtaining native waveform signal but no conventional numerical data, and possibility of development on apparatus diagnosis such as detection of abnormal sign and others. (G.K.)

  1. A new electronic circuit for NIM rack power supply

    International Nuclear Information System (INIS)

    Toledo, Fabio de; Domienikan, Claudio; Zahn, Guilherme S.

    2013-01-01

    A new and useful electronic circuit designed to substitute the old power supply of IPEN model PM 1212 Nuclear Instrument Modules (NIM) racks is presented. Originally, these NIM racks were projected by IPEN workshop at 1974 to be used in nuclear research laboratories. The PM1212 provided mounting space and power sources for up to 12 standard nuclear electronic modules and power supply regulated DC voltages of ±24V (2A), ±12V (4A) and unregulated AC 117V (0.5A). Currently, several of these NIM racks are not in use because the electronic components of the original design have become obsolete and are no longer manufactured. The new electronic circuit provides the same original voltages adjusted in the single circuit and, additionally, ±6V. The new power supply was designed and constructed at IPEN-CNEN/SP by employing modern national components and expertise. (author)

  2. A new electronic circuit for NIM rack power supply

    Energy Technology Data Exchange (ETDEWEB)

    Toledo, Fabio de; Domienikan, Claudio; Zahn, Guilherme S., E-mail: fatoledo@ipen.br, E-mail: clanikan@ipen.br, E-mail: gzahn@ipen.br [Intituto de Pesquisas Energeticas e Nucleares (IPEN-CNEN/SP), Sao Paulo, SP (Brazil)

    2013-07-01

    A new and useful electronic circuit designed to substitute the old power supply of IPEN model PM 1212 Nuclear Instrument Modules (NIM) racks is presented. Originally, these NIM racks were projected by IPEN workshop at 1974 to be used in nuclear research laboratories. The PM1212 provided mounting space and power sources for up to 12 standard nuclear electronic modules and power supply regulated DC voltages of ±24V (2A), ±12V (4A) and unregulated AC 117V (0.5A). Currently, several of these NIM racks are not in use because the electronic components of the original design have become obsolete and are no longer manufactured. The new electronic circuit provides the same original voltages adjusted in the single circuit and, additionally, ±6V. The new power supply was designed and constructed at IPEN-CNEN/SP by employing modern national components and expertise. (author)

  3. Multi-megawatt wind-power installations call for new, high-performance solutions

    International Nuclear Information System (INIS)

    2004-01-01

    This article discusses the development of increasingly powerful and profitable wind-energy installations for off-shore, on-shore and refurbishment sites. In particular, the rapid development of megawatt-class units is discussed. The latest products of various companies with rotor diameters of up to 120 metres and with power ratings of up to 5 MW are looked at and commented on. The innovations needed for the reduction of weight and the extreme demands placed on gearing systems are discussed. Also, the growing markets for wind energy installations in Europe and the United States are discussed and plans for new off-shore wind parks are looked at

  4. Power electronics solution to dust emissions from thermal power plants

    Directory of Open Access Journals (Sweden)

    Vukosavić Slobodan

    2010-01-01

    Full Text Available Thermal power stations emit significant amounts of fly ash and ultra fine particles into the atmosphere. Electrostatic precipitators (ESP or electro filters remove flying ashes and fine particles from the flue gas before passing the gas into the chimney. Maximum allowable value of dust is 50 mg/m3 and it requires that the efficiency of the ESPs better than 99 %, which calls for an increase of active surface of the electrodes, hence increasing the filter volume and the weight of steel used for the filter. In previous decades, electrostatic precipitators in thermal power plants were fed by thyristor controlled, single phase fed devices having a high degree of reliability, but with a relatively low collection efficiency, hence requiring large effective surface of the collection plates and a large weight of steel construction in order to achieve the prescribed emission limits. Collection efficiency and energy efficiency of the electrostatic precipitator can be increased by applying high frequency high voltage power supply (HF HV. Electrical engineering faculty of the University of Belgrade (ETF has developed technology and HF HV equipment for the ESP power supply. This solution was subjected to extensive experimental investigation at TE Morava from 2008 to 2010. High frequency power supply is proven to reduce emission two times in controlled conditions while increasing energy efficiency of the precipitator, compared to the conventional thyristor controlled 50Hz supply. Two high frequency high voltage unit AR70/1000 with parameters 70 kV and 1000 mA are installed at TE Morava and thoroughly testes. It was found that the HF HV power supply of the ESP at TE Morava increases collection efficiency so that emission of fine particles and flying ashes are halved, brought down to only 50 % of the emissions encountered with conventional 50 Hz thyristor driven power supplies. On the basis of this study, conclusion is drawn that the equipment comprising HF HV

  5. Development of a global electricity supply model and investigation of electricity supply by renewable energies with a focus on energy storage requirements for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Troendle, Tobias Wolfgang

    2014-12-12

    Electricity supply at present requires about 38% of the global primary energy demand and it is likely to rise further in the coming decades. Facing major problems, such as limited resources of fuels and an ongoing anthropogenic climate change, a sustainable electricity supply based on renewable energies is absolutely vital. Wind and solar power will play an extensive role in future supplies but require energy storage capacities to meet electricity demand. To investigate the relationship of power plant mix and required energy storage capacity, a computer model based on global weather data has been developed to enable the simulation of electricity supply scenarios by up to ten different power plant types for various regions. The focus of the investigation has been on the energy storage requirements of an electricity supply for Europe by wind and solar power. The minimum required energy storage capacity for a totally weather dependent electricity supply occurs at a ratio of 30% wind and 70% photovoltaic (PV) power plant capacity installed. Thus, the required energy storage capacity rises from a transition of to-day's electricity supply to the afore-mentioned 100% renewable wind and PV scenario exponentially to about 150 TWh (3.8% of the annual electricity demand). The installation of additional excess wind and PV power plant capacity was seen to be an efficient way to reduce the required energy storage. Already 10% excess capacity lead to a reduction by 50% of the required storage capacity. To use different storage technologies in an optimised way in terms of storage capacity and efficiency, the storage tasks can be separated into a daily and a seasonal usage. While the seasonal storage capacity has to be about two orders of magnitude larger than the required capacity of the storage for the daily cycle, the sum of stored energy during one year is almost equal for the long and short time storage. In summary, an electricity supply by wind and PV power was shown to

  6. Development of a global electricity supply model and investigation of electricity supply by renewable energies with a focus on energy storage requirements for Europe

    International Nuclear Information System (INIS)

    Troendle, Tobias Wolfgang

    2014-01-01

    Electricity supply at present requires about 38% of the global primary energy demand and it is likely to rise further in the coming decades. Facing major problems, such as limited resources of fuels and an ongoing anthropogenic climate change, a sustainable electricity supply based on renewable energies is absolutely vital. Wind and solar power will play an extensive role in future supplies but require energy storage capacities to meet electricity demand. To investigate the relationship of power plant mix and required energy storage capacity, a computer model based on global weather data has been developed to enable the simulation of electricity supply scenarios by up to ten different power plant types for various regions. The focus of the investigation has been on the energy storage requirements of an electricity supply for Europe by wind and solar power. The minimum required energy storage capacity for a totally weather dependent electricity supply occurs at a ratio of 30% wind and 70% photovoltaic (PV) power plant capacity installed. Thus, the required energy storage capacity rises from a transition of to-day's electricity supply to the afore-mentioned 100% renewable wind and PV scenario exponentially to about 150 TWh (3.8% of the annual electricity demand). The installation of additional excess wind and PV power plant capacity was seen to be an efficient way to reduce the required energy storage. Already 10% excess capacity lead to a reduction by 50% of the required storage capacity. To use different storage technologies in an optimised way in terms of storage capacity and efficiency, the storage tasks can be separated into a daily and a seasonal usage. While the seasonal storage capacity has to be about two orders of magnitude larger than the required capacity of the storage for the daily cycle, the sum of stored energy during one year is almost equal for the long and short time storage. In summary, an electricity supply by wind and PV power was shown to

  7. Active Power Flow Optimization of Industrial Power Supply with Regard to the Transmission Line Conductor Heating

    Directory of Open Access Journals (Sweden)

    Leyzgold D.Yu.

    2015-04-01

    Full Text Available This article studies the problem of the transmission line conductor heating effect on the active power flows optimization in the local segment of industrial power supply. The purpose is to determine the optimal generation rating of the distributed power sources, in which the power flow values will correspond to the minimum active power losses in the power supply. The timeliness is the need to define the most appropriate rated power values of distributed sources which will be connected to current industrial power supply. Basing on the model of active power flow optimization, authors formulate the description of the nonlinear transportation problem considering the active power losses depending on the transmission line conductor heating. Authors proposed a new approach to the heating model parameters definition based on allowable current loads and nominal parameters of conductors as part of the optimization problem. Analysis of study results showed that, despite the relatively small active power losses reduction to the tune 0,45% due to accounting of the conductors heating effect for the present configuration of power supply, there are significant fluctuations in the required generation rating in nodes of the network to 9,32% within seasonal changes in the outer air temperature. This fact should be taken into account when selecting the optimum power of distributed generation systems, as exemplified by an arbitrary network configuration.

  8. High performance magnet power supply optimization

    International Nuclear Information System (INIS)

    Jackson, L.T.

    1975-01-01

    Three types of magnet power supply systems for the joint LBL-SLAC proposed accelerator PEP are discussed. The systems considered include a firing circuit and six-pulse controlled rectifier, transistor systems, and a chopper system. (U.S.)

  9. Fast quadrupole pulsed power supply in the AGS

    International Nuclear Information System (INIS)

    Nawrocky, R.J.; Halama, H.J.; Lambiase, R.F.; Montemurro, P.A.

    1984-01-01

    As part of the Polarized Proton Project at the AGS, a pulsed power supply system has been developed to energize a set of twelve fast quadrupoles which are symmetrically distributed around the 1/2-mile circumference of the machine. During a typical acceleration cycle, which is normally repeated every 2.4 s, these magnets are energized with bursts of triangular current pulses. The rise-time of each pulse is less than 2 μs and the width at the base varies from 1 to 3.5 ms depending on the pulse. Within a burst, pulses alternate in polarity and vary in amplitude from 160 A to 2700 A peak. Pulse separation is on the order of 40 ms. Due to the distributed nature of the load and high di/dt, each magnet is powered by a separate modulator. Magnets are driven via coaxial pulse transmission cables up to 200 ft long. In the modulators, the high power pulses are switched with thyratron/ignitron switch pairs. All modulators are charged in parallel with a common system of programmable high voltage power supplies. The overall system is controlled with a distributed network of microcomputers. This paper describes the development, construction and initial performance of the pulsed power supply system

  10. Influences of the pulsed power supply on corona streamer appearance

    NARCIS (Netherlands)

    Veldhuizen, van E.M.; Briels, T.M.P.; Grabowski, L.R.; Pemen, A.J.M.; Ebert, U.M.

    2005-01-01

    Pulsed positive corona streamers in air are studied by images obtained with an intensified CCD camera. Using a switched capacitor power supply, thin streamers are observed that branch. A power supply consisting of a 4-stage transmission line transformer gives pulses of much higher current to the

  11. Ten-year statistics of the electric power supply. Status and tendencies

    International Nuclear Information System (INIS)

    2001-12-01

    The ten-year statistics of the electric power supply in Denmark for 1991-2000 presents in tables and figures the trend of the electric power supply sector during the last ten years. The tables and figures present information on total energy consumption, combined heat and power generation, fuel consumption and the environment, the technical systems, economy and pricing, organization of the electricity supply, and information on electricity prices and taxes for households and industry in various countries. (LN)

  12. EVALUATING DEGREE OF ACTIVE POWER LOSSES REDUCTION IN THE ELECTRIC POWER LINES WITH REACTIVE POWER COMPENSATION

    Directory of Open Access Journals (Sweden)

    V. N. Radkevich

    2016-01-01

    Full Text Available The paper considers evaluation procedure for the degree of active power losses reduction in the power transmission lines under 1 kV and 6–10 kV of the systems of electric power supply of industrial enterprises with compensating installations mounted at the side of the customer. The capacitor installations conform to the applied voltage level and factor in dielectric losses in the capacitors. The voltage at the compensating device terminal changes from 0.95 to 1.05 of the capacitors nominal voltage. The study did not account for reactive power losses in the line, nor did it for its charge capacity, conditioned by relative shortness of the cable lines generally operating in the mains of industrial enterprises. For this reason, the quantities of reactive power being consumed and generated by the transmission line are negligible and do not significantly affect the reactive power flux. The researchers obtain functional relations that allow estimating the degree of power loss reduction in the transmission line factoring in its explicit initial data. They perform mathematical analysis of the obtained functional relations and study the function by means of derivatives. The function extremum points are found as well as the intervals of its increment and decrement. A graphical research of the obtained functional relation is performed. It is ascertained that reduction of the active power losses is contingent on the line and the capacitor-installation engineering factors, the electrical energy consumer reactive load value as well as the voltage applied to the capacitor installation. The functional relations presented in the article can be employed in scoping calculation necessary for decision making on the reactive power compensation in systems of the industrial facilities electric power supply. Their account will allow a more accurate estimate of technical and economic effect of the capacitor bank installation in the electrical mains under 1 kV and 6

  13. A disruptive approach for a green field smart grid installation

    Energy Technology Data Exchange (ETDEWEB)

    Bishnoi, Peeush [Siemens Technology and Services Pvt. Ltd., Bangalore (India); Klein, Wolfram; Kuntschke, Richard; Speh, Rainer; Waszak, Michal-Wolfgang [Siemens AG, Muenchen (Germany)

    2012-07-01

    The current trend towards increasingly decentralized power generation including renewable generation such as photovoltaic or wind power calls for a new concept for future power supply systems. The future power grid has to incorporate numerous distributed and comparatively small-sized generation facilities in addition to the larger centralized power plants currently in operation. Consumers will turn into prosumers that consume as well as produce electrical power. Thus, power will no longer flow exclusively from power plants to consumers such as households and industrial plants, but also between consumers, requiring new solutions, e.g., for protection within the power grid. In this paper, we propose a disruptive approach for a green field smart grid installation solving the issues arising from the increasing use of decentralized power generation. The new power supply system proposed can handle up to 100 % of volatile renewable generation and allows dynamic growth of the power grid with little effort. It is therefore suitable for building up new power supply systems in previously non-electrified regions, e.g., in rural areas in developing countries. At the same time, the system also offers solutions for the issues arising from the advent of the new energy age in developed countries. (orig.)

  14. Development of a Simulation Framework for Analyzing Security of Supply in Integrated Gas and Electric Power Systems

    Directory of Open Access Journals (Sweden)

    Kwabena Addo Pambour

    2017-01-01

    Full Text Available Gas and power networks are tightly coupled and interact with each other due to physically interconnected facilities. In an integrated gas and power network, a contingency observed in one system may cause iterative cascading failures, resulting in network wide disruptions. Therefore, understanding the impacts of the interactions in both systems is crucial for governments, system operators, regulators and operational planners, particularly, to ensure security of supply for the overall energy system. Although simulation has been widely used in the assessment of gas systems as well as power systems, there is a significant gap in simulation models that are able to address the coupling of both systems. In this paper, a simulation framework that models and simulates the gas and power network in an integrated manner is proposed. The framework consists of a transient model for the gas system and a steady state model for the power system based on AC-Optimal Power Flow. The gas and power system model are coupled through an interface which uses the coupling equations to establish the data exchange and coordination between the individual models. The bidirectional interlink between both systems considered in this studies are the fuel gas offtake of gas fired power plants for power generation and the power supply to liquefied natural gas (LNG terminals and electric drivers installed in gas compressor stations and underground gas storage facilities. The simulation framework is implemented into an innovative simulation tool named SAInt (Scenario Analysis Interface for Energy Systems and the capabilities of the tool are demonstrated by performing a contingency analysis for a real world example. Results indicate how a disruption triggered in one system propagates to the other system and affects the operation of critical facilities. In addition, the studies show the importance of using transient gas models for security of supply studies instead of successions of

  15. Optimal Design of Magnetic ComponentsinPlasma Cutting Power Supply

    Science.gov (United States)

    Jiang, J. F.; Zhu, B. R.; Zhao, W. N.; Yang, X. J.; Tang, H. J.

    2017-10-01

    Phase-shifted transformer and DC reactor are usually needed in chopper plasma cutting power supply. Because of high power rate, the loss of magnetic components may reach to several kilowatts, which seriously affects the conversion efficiency. Therefore, it is necessary to research and design low loss magnetic components by means of efficient magnetic materials and optimal design methods. The main task in this paper is to compare the core loss of different magnetic material, to analyze the influence of transformer structure, winding arrangement and wire structure on the characteristics of magnetic component. Then another task is to select suitable magnetic material, structure and wire in order to reduce the loss and volume of magnetic components. Based on the above outcome, the optimization design process of transformer and dc reactor are proposed in chopper plasma cutting power supply with a lot of solutions. These solutions are analyzed and compared before the determination of the optimal solution in order to reduce the volume and power loss of the two magnetic components and improve the conversion efficiency of plasma cutting power supply.

  16. Energy saved neon sign lighting power supply for photovoltaic systems

    Energy Technology Data Exchange (ETDEWEB)

    Tanitteerapan, T.; Dokpikul, S.; Arunrungrasmi, S. [King Mongkut Univ. of Technology Thonburi, Bangmod, Tungkru, Bangkok (Thailand). Dept. of Electrical Technology Education, Faculty of Industrial Education

    2007-07-01

    Petroleum oil, natural gas and fossil fuels are commonly used in power plants for electrical power generation. However, because of their negative environmental impacts, energy and environmental savings from renewable energy resources are necessary choices. Solar energy can be converted to the electrical voltage by using solar arrays. This process can be used in many electrical applications. This paper introduced a neon sign lighting power supply for a small photovoltaic powered stand-alone commercial advertising board for a remote area in Thailand. The circuit implementation was very simple, consisting of an active switch device, a resonant capacitor and high frequency transformer. The control also operated as a fixed frequency and fixed duty ratio controller. The paper discussed the principle of neon sign lighting, power circuit operation, and control circuit operation. To verify the proposed power supply, the circuit experiment of the proposed power supply for the neon sign lighting was applied to a 10 foot long, 10 millimeter diameter bulb. The neon sign was ignited smoothly with little power consumption. 2 refs., 1 tab., 10 figs.

  17. Causes and effects of vital instrumentation and control power supply bus failures

    International Nuclear Information System (INIS)

    Muhlheim, M.D.; Murphy, G.A.

    1987-01-01

    This article presents the results of a study in which the objective was to evaluate nuclear power-plant operating experience to identify the causes and the effects of vital instrumentation and control (I and C) power supply bus failures. Vital I and C power is normally provided to essential instrumentation and controls through either vital d-c or a-c power supply systems. The vital d-c power supply system generally provides control power for starting the diesel generators, for operating electrical circuit breakers, and for controlling various logic circuits. The vital d-c power system also supplies vital a-c power through an inverter. The vital a-c power supply system generally feeds the reactor protection system channels, the engineered safety features actuation system channels, and critical instrumentation in the control room. The leading cause of vital bus failures is inverter failures; other causes are human errors, battery charger failures, and miscellaneous failures. The effects of these failures are that the margin of safety can be degraded by (1) denying key information to the operators, (2) inducing plant transients, (3) causing safety injection actuations, and (4) causing the loss of shutdown cooling flow

  18. Power supply system for the superconducting outsert of the CHMFL hybrid magnet

    Science.gov (United States)

    Fang, Z.; Zhu, J.; Chen, W.; Jiang, D.; Huang, P.; Chen, Z.; Tan, Y.; Kuang, G.

    2017-12-01

    The construction of a new hybrid magnet, consisting of a 11 T superconducting outsert and a 34 T resistive insert magnet, has been finished at the Chinese High Magnetic Field Laboratory (CHMFL) in Hefei. With a room temperature bore of 800 mm in diameter, the hybrid magnet superconducting outsert is composed of four separate Nb3Sn-based Cable-in-Conduit Conductor (CICC) coils electrically connected in series and powered by a single power supply system. The power supply system for the superconducting outsert consists of a 16 kA DC power supply, a quench protection system, a pair of 16 kA High Temperature Superconducting (HTS) current leads, and two Low Temperature Superconducting bus-lines. The design and manufacturing of the power supply system have been completed at the CHMFL. This paper describes the design features of the power supply system as well as the current fabrication condition of its main components.

  19. Optimization of heat supply systems employing nuclear power plants

    International Nuclear Information System (INIS)

    Urbanek, J.

    1988-01-01

    Decision making on the further development of heat supply systems requires optimization of the parameters. In particular, meeting the demands of peak load ranges is of importance. The heat supply coefficient α and the annual utilization of peak load equipment τ FS have been chosen as the characteristic quantities to describe them. The heat price at the consumer, C V , offers as the optimization criterion. The transport distance, temperature spread of the heating water, and different curves of annual variation of heat consumption on heat supply coefficient and heat price at the consumer. A comparison between heat supply by nuclear power plants and nuclear heating stations verifies the advantage of combined heat and power generation even with longer heat transport distances as compared with local heat supply by nuclear district heating stations based on the criterion of minimum employment of peak load boilers. (author)

  20. Ten-year statistics of the electric power supply. Status and tendencies

    International Nuclear Information System (INIS)

    2000-12-01

    The ten-year statistics of the electric power supply in Denmark for 1990-1999 presents in tables and figures the trend of the electric power supply sector during the last ten years. The tables and figures present information on total energy consumption, combined heat and power generation, fuel consumption and the environment, the technical systems, economy and pricing, organization of the electricity supply, auto-production of electricity and information on electricity prices and taxes for households and industry in various countries. (LN)

  1. A stakeholder analysis of divergent supply-chain trends for the European onshore and offshore wind installations

    International Nuclear Information System (INIS)

    Wüstemeyer, Christoph; Madlener, Reinhard; Bunn, Derek W.

    2015-01-01

    This paper provides a survey-based analysis of investment decisions and structural shifts related to onshore and offshore wind power supply chains. Insights on cost reductions are obtained from a detailed stakeholder survey conducted amongst the European wind power industry in 2012. Overall, a rather more optimistic view of the scope for cost reductions in offshore technology is presented than has previously been evident in empirical analysis. From the analysis we conclude that the wind power industry has experienced a decoupling process of the offshore supply chain from its onshore counterpart with diverging technological requirements. For policy-makers, it is essential to acknowledge that barriers to adoption and the consequent needs for subsidies among the players in the onshore and offshore supply chains seem to differ, and that a micro-level analysis of the innovations and risks involved at the various stages in the supply chain is necessary. - Highlights: • Survey-based analysis of supply chain trends in the European wind energy industry. • Study of technology adoption decisions, structural shifts, and cost projections. • Results reveal a decoupling process between onshore and offshore supply chains. • Possibilities to transfer knowledge from the onshore to the offshore product vary. • The divergent barriers to adoption need to be accounted for by policy-makers

  2. Study of Formosa's electrical offer for installing a commercial nuclear power plant

    International Nuclear Information System (INIS)

    Torino Araoz, Ines; Parera, Maria D.

    2011-01-01

    Within the specific agreement for the siting study of the CAREM nuclear power plant in Formosa Province, signed between the National Atomic Energy Commission and the Government of Formosa, a detailed study of electrical supply was conducted in order to analyze the requirements and the electricity supply as a result of its future installation. This topic is part of the analysis developed in the Level II of the site survey study. The analysis focuses on a plan for long-term projections from 2005 to 2030, using the IAEA’s MESSAGE model (Model for Energy Supply Strategy Alternatives and Their General Environmental Impacts). The existing electrical infrastructure and the plans for expansion of transmission and distribution lines, the generation technologies and the electricity flows with the provinces and neighboring countries have been taken into account. The study was based on the evaluation of two site scenarios based on the availability of infrastructure in the province and the conclusions obtained in the Level I of the siting study. The modelling results indicate that the current situation that characterizes the Province as a net importer of electricity will be reversed due to the operation of the nuclear plant since 2019. However, it is important to note that to keep Formosa’s feature as an electricity exporter from the year 2026, according to the less favorable scenario (highest demand), ongoing energy planning and investment in the province will be done. (author) [es

  3. Rural power supply with local management: Examples from Bolivia, India and Nepal

    Energy Technology Data Exchange (ETDEWEB)

    Gerger, Aa; Gullberg, M

    1997-08-01

    Local management of rural power supply is being evaluated in a joint research project conducted by Tanzania Electric Supply Company Limited (TANESCO) and Stockholm Environment Institute (SEI) on new approaches to management and organization of rural electrification. The study is based on literature, and on data from eight visited local organizations for management of power supply in Bolivia (4), India (1) and Nepal (3). Common for these countries is that the national, rural electrification programmes have encountered difficulties. Governments have failed to generate enough funds from existing power supply systems to cover the cost for a continued rural electrification. In cases where large private companies exist, they have had few incentives for expanding into rural areas since it is often not profit making. A third category may be defined as local initiators to power supply, private or co-operative. In all these countries, locally managed power supply systems have developed as a complement to governmental and other large scale programmes. The national policies pertaining to rural power supply in general and local management thereof in particular are described for each country. From the study, it appears that local management of rural power supply is a feasible approach in developing countries. Local management of rural power supply can slightly lower the costs of electrification, and it may help accelerate the pace of load development in newly electrified areas. For successful local organizations though, the most significant factor appears to be local peoples` willingness to develop their own area. Important though, is that proper financial and technical assistance is provided the local organizations. Crucial for sound external assistance is that the national rural electrification policies are clear and consistent. 53 refs, 1 fig, 11 tabs

  4. Small nuclear power reactor emergency electric power supply system reliability comparative analysis

    International Nuclear Information System (INIS)

    Bonfietti, Gerson

    2003-01-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  5. Ultracapacitor-Based Uninterrupted Power Supply System

    Science.gov (United States)

    Eichenberg, Dennis J.

    2011-01-01

    The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less

  6. Design of full digital 50 kV electronic gun high voltage power supply

    International Nuclear Information System (INIS)

    Ge Lei; Shang Lei

    2014-01-01

    The design of full digital electronic gun high voltage power supply based on DSP was introduced in this paper. This power supply has innovations of full digital feedback circuit and PID closed-loop control mode. The application of high frequency resonant converter circuit reduces the size of the resonant element and transformer. The current-coupling distributed high voltage transformer and rectifier circuit were employed in this power supply. By this way, the power supply efficiency is improved and the number of distributed parameters is reduced, and the rectifier circuit could work under the oil-free environment. This power supply has been used in electronic grid-control high voltage system of the irradiation accelerator. (authors)

  7. A short history of wind power - from its early beginnings to today's installations and its business environment

    International Nuclear Information System (INIS)

    2005-01-01

    This article takes a look at how wind power has developed from its beginnings centuries ago with windmills over early installations in Denmark around 1900 through to the modern wind-parks providing many thousands of megawatts of wind power generated by 100-metre-high units with installed power ratings of up to 5 megawatts. The history of wind power is looked at from the simple windmill to the modern, industrially manufactured mass product. The expected growth of the wind-power market in the twenty-first century is discussed, as are the legal regulations governing their construction and use. Figures are also given on production capacities and installed power in various countries

  8. Simple power supply for power load controlled isoelectric focusing

    Czech Academy of Sciences Publication Activity Database

    Duša, Filip; Šlais, Karel

    2014-01-01

    Roč. 35, č. 8 (2014), s. 1114-1117 ISSN 0173-0835 R&D Projects: GA MV VG20102015023 Institutional support: RVO:68081715 Keywords : isoelectric focusing * power supply * voltage multiplier Subject RIV: CB - Analytical Chemistry, Separation Impact factor: 3.028, year: 2014 http://hdl.handle.net/11104/0231022

  9. Analysis of financial support for photovoltaic system installation with the economic simulation model

    International Nuclear Information System (INIS)

    Imamura, E.; Uchiyama, Y.

    1994-01-01

    The authors developed a penetration method of dispersed generation technologies and tried to investigate economic simulation on photovoltaic systems. The model is composed of several analysis modules; a technology application module, a regional meteorology module, cost modules such as capital cost, power generation cost, marginal cost and avoided cost, and a logistic penetration module. The database management system of application forms, meteorological data, energy demand and equipment costs is also developed to support the model. The main purpose of the study is to make clear impacts to the power supply configuration and cost/benefit effects when PV systems are installed into several different sectors in Japan. The ultimate potential of PV system is 235, 103MWp and its market potential is 15,172 MWp in Japan. Market penetration highly depends on cost learning factors of several components of PV system. The installed capacity with 50% subsidy is 5 times larger than that with 67%. In conclusion, it is feasible for government or utilities to financially support the promotion and installation of PV systems as the electricity supply system

  10. Design study of an AC power supply system in JT-60SA

    International Nuclear Information System (INIS)

    Shimada, Katsuhiro; Baulaigue, Olivier; Cara, Philippe; Coletti, Alberto; Coletti, Roberto; Matsukawa, Makoto; Terakado, Tsunehisa; Yamauchi, Kunihito

    2011-01-01

    In the initial research phase of JT-60SA, which is the International Thermonuclear Experimental Reactor (ITER) satellite Tokamak with superconducting toroidal and poloidal magnetic field coils, the plasma heating operation of 30 MW-60 s or 20 MW-100 s is planned for 5.5 MA single null divertor plasmas. To achieve this operation, AC power source of the medium voltage of 18 kV and ∼7 GJ has to be provided in total to the poloidal field coil power supplies and additional heating devices such as neutral beam injection (NBI) and electron cyclotron radio frequency (ECRF). In this paper, the proposed AC power supply system in JT-60SA was estimated from the view point of available power, and harmonic currents based on the standard plasma operation scenario during the initial research phase. This AC power supply system consists of the reused JT-60 power supply facilities including motor generators with flywheel, AC breakers, harmonic filters, etc., to make it cost effective. In addition, the conceptual design of the upgraded AC power supply system for the ultimate heating power of 41 MW-100 s in the extended research phase is also described.

  11. Electric power. The boom of continuous supply

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    The increasing needs in electric supply that exist in computer industry and Internet or more classical industry and tertiary sector have boosted the non-interruptible power supply market and decentralized generation groups. One can imagine the development of mini networks exploited by new types operators, progressive renunciation of the diesel engine for the profit of gas turbine and soon fuel cell and new opportunities for the cogeneration. (N.C.)

  12. Development of a heavy duty portable variable power supply (HPVPS)

    Science.gov (United States)

    Musa, Ahmad Zulfadli Bin; Lung, Chong Man; Abidin, Wan'Amirah Basyarah Binti Zainol

    2017-08-01

    This paper covers the innovation of a Heavy Duty Portable Variable Power Supply (HPVPS) in Jabatan Kejuruteraan Elektrik (JKE), Politeknik Mukah, Sarawak (PMU). This project consists of variable power supply which can vary the output from 1.2 V to 11.6V, AC pure wave inverter to convert DC to AC for the operation of low power home appliances and also used Li-on rechargeable batteries to store the electrical energy and additional feature that can be used to jump-start the batteries of the car. The main objective of this project is to make the user can operate the electronic devices anywhere whenever if no electricity while doing their lab activities. Most of the regulated power supply in JKE lab aged 9-10 years old and need periodical maintenance and need cost and also the unit can be used is not enough to support the whole class during lab activities. As a result, the P&P process will be facing the major problem in order to make the lab activities running smoothly. By development of the portable variable power supply, the P&P process is more efficient and very helpful.

  13. Power supply system for negative ion source at IPR

    Science.gov (United States)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K. G.; Soni, Jignesh; Bandyopadhyay, M.; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-02-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ~5 × 1012 cm-3, from which ~ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (~15 to 35kV), and high current (~ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (~50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (~ 50kV) isolated from the system. The paper shall present the

  14. Power supply system for negative ion source at IPR

    International Nuclear Information System (INIS)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K G; Soni, Jignesh; Bandyopadhyay, M; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-01-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ∼5 x 10 12 cm -3 , from which ∼ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (∼15 to 35kV), and high current (∼ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (∼50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (∼ 50kV) isolated from the system. The paper shall

  15. A new mobile application for maintenance tasks in photovoltaic installations by using GPS data

    International Nuclear Information System (INIS)

    Fernández-Pacheco, D.G.; Molina-Martínez, J.M.; Ruiz-Canales, A.; Jiménez, M.

    2012-01-01

    Highlights: ► Portable and easy-to-use solution to detect possible failures at a PV installation. ► Calculation of solar and photovoltaic parameters by using a mobile device with GPS. ► No software which confers this utility to a mobile device can be found in the market. - Abstract: The application of the Information and Communication Technologies (ICTs) to the photovoltaic (PV) energy sector has increased notably in the last years. This paper presents a new mobile software application for maintenance tasks in PV installations by determining the PV output power of the system, the daily energy production, the clear-sky global solar radiation and other parameters associated with solar position from Global Position Data in handheld devices endowed with Android or Windows Mobile operating systems. The calculation of these parameters permits a technician to know if the PV plant is working properly, since the difference between the PV output power supplied by the installation in a clear-sky day for a determined hourly period and the values estimated by the application should be minimal. In case of fixed installations, the application also permits to determine if the PV module support structures of the installation are correctly oriented. Some comparisons between data supplied by four real PV installations and data calculated by the proposed application were performed for evaluation purposes.

  16. Gas supply for independent power projects: Drilling programs and reserve acquisitions

    International Nuclear Information System (INIS)

    Lambert, J.D.; Walker, R.K.

    1990-01-01

    Developers of gas-fired independent power projects, although drawn to gas as the fuel of choice for economic and environmental reasons, are finding the problem of cost-effective gas supply to be intractable. By one estimate, there are $6 billion worth of gas-fired projects languishing in the planning stage for want of long-term gas supply that is acceptable to project lenders. Worse still, as the authors are aware, some currently operating gas-fired projects lack such a supply, thus forcing the developer to rely on the spot market for gas as an interim (and unsatisfactory) solution. Although spot market prices in the deregulated natural gas industry have remained relatively low over several years, long-term gas supply has become problematic, particularly for power projects whose economics typically require an assured supply at a determined price over a multiyear period. In short, while there is an increasing demand for gas as a preferred source of fuel supply for power projects, there are discontinuities in the approaches taken to contracting for that supply by producers and developers. These concern primarily allocation of the risk of commodity-driven price increases during the term of the fuel supply contract. Without a means of accommodating price-related risk, the parties will inevitably find themselves at an impasse in contract negotiations. If there is a barrier to the independent power generation industry's vertical integration into gas production, it is the fundamental insularity of the two industries. As they have discovered, it may be indispensable for gas producers and power developers to employ intermediaries familiar with both industries in order to consummate appropriate joint-venture drilling programs and reserve acquisitions. Given the economic consequences of doing so successfully, however, they believe such programs and acquisitions may become an integral part of independent power developers' business strategy in the 1990s and beyond

  17. Installation of a second superconducting wiggler at SAGA-LS

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.; Koda, S. [SAGA Light Source, 8-7 Yayoigaoka, Tosu 841-0005 (Japan)

    2016-07-27

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of the vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.

  18. Target study of heat supply from Northern Moravia nuclear power plant

    International Nuclear Information System (INIS)

    Pospisil, V.

    The construction is envisaged in Northern Moravia of a nuclear power plant near Blahutovice in the Novy Jicin district. Heat produced by the nuclear power plant will only be used for district heating; process heat will be supplied from local steam sources. An example is discussed of the Prerov locality which currently is supplied from the Prerov heating and power plant (230 MW), a heating plant (36 MW) and from local sources (15 NW). The study estimates that a thermal power of 430 MW will be required at a time of the start of heat supplies from the nuclear power plant. All heat supply pipelines will be designed as a two-tube system divided into sections with section pipe fittings. The number and location of pipe fittings will be selected depending on the terrain configuration. Water of the maximum outlet temperature of 150 degC will be used as a coolant. The control of the system for Northern Moravia is briefly described. (J.P.)

  19. Protection and switching system for the RFX power supply

    International Nuclear Information System (INIS)

    Browning, J.L.; Gray, J.W.; Mace, T.A.; Varley, G.L.

    1986-01-01

    The RFX toroidal field power supply comprises a large 4.8MJ (max) modular capacitor bank and four 14MW AC/DC converter flat-top power supply modules. The high fault level associated with the capacitor banks presents a problem in the design of the switching system, since mistiming could produce large currents in the flat-top supplies. The poloidal circuit consists of four groups of magnetising windings connected in series, each with its own flat-top convertor supply and opening switch transfer system. The flat-top converter supplies are needed when the transfer voltage has fallen from approximately 40kV to 1kV. Solutions to the problem of designing a fault-tolerant system which presents no danger to the flat-top converters are described in the paper. The adopted methods make use of hybrid ignitron/mechanical switches to give the required combination of switching speed and current carrying capacity, together with careful attention to the circuit layout of different switching elements. (author)

  20. Quality assurance in the structural installations of nuclear power stations

    International Nuclear Information System (INIS)

    Schnellenbach, G.; Wrage, S.

    1985-01-01

    The concept of quality assurance distinguishes between self-monitoring of the design, manufacturing and executing firms and external monitoring by state institutions or by experts commissioned by them. The long-term control of structures is within the area of responsibility of the owner. This quality assurance concept is controlled in detail by statutes, which clearly define responsibilities. This structural engineering quality assurance system also forms the basis for the design, construction and utilization of structural installations of nuclear power stations; requirements emanating from the Atomic Energy Acts for the structural installations demand, however, to some extent a sharpening of self- and external monitoring. Therefore, today a quality concept has been developed for the important engineering safety-related buildings of nuclear power stations. This concept takes account of the strict requirements imposed and fulfils the requirement of KTA 1401. (orig.) [de

  1. Dimensioning aspects of 48 V telecommunications power supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Jakab, L. [Siemens Telefongyar Kft (Hungary)

    2000-07-01

    Considering the reliable operation of the 48 V telecommunications power supply systems it is essential the appropriate dimensioning. The basic elements of the power supply systems, i.e. batteries, rectifiers, DC/AC cabling, fuses, etc., should be defined by exact calculation. The presentation reviews the main questions and problems of dimensioning. It lays a special emphasis on the optimized planning procedure, further it also deals with the economical impacts of the dimensioning parameters. (orig.)

  2. Plant process computer replacements - techniques to limit installation schedules and costs

    International Nuclear Information System (INIS)

    Baker, M.D.; Olson, J.L.

    1992-01-01

    Plant process computer systems, a standard fixture in all nuclear power plants, are used to monitor and display important plant process parameters. Scanning thousands of field sensors and alarming out-of-limit values, these computer systems are heavily relied on by control room operators. The original nuclear steam supply system (NSSS) vendor for the power plant often supplied the plant process computer. Designed using sixties and seventies technology, a plant's original process computer has been obsolete for some time. Driven by increased maintenance costs and new US Nuclear Regulatory Commission regulations such as NUREG-0737, Suppl. 1, many utilities have replaced their process computers with more modern computer systems. Given that computer systems are by their nature prone to rapid obsolescence, this replacement cycle will likely repeat. A process computer replacement project can be a significant capital expenditure and must be performed during a scheduled refueling outage. The object of the installation process is to install a working system on schedule. Experience gained by supervising several computer replacement installations has taught lessons that, if applied, will shorten the schedule and limit the risk of costly delays. Examples illustrating this technique are given. This paper and these examples deal only with the installation process and assume that the replacement computer system has been adequately designed, and development and factory tested

  3. Development of Power System for Medium Energy Accelerator

    International Nuclear Information System (INIS)

    Kwon, Hyeok Jung; Kim, Dae Il; Kim, Han Sung; Seol, Kyung Tae; Jang, Ji Ho; Cho, Yong Sub; Hong, In Seok; Kim, Kyung Ryul

    2008-05-01

    The main goal of the studies are to develop a power supply system used for 100MeV proton accelerator and to operate 20MeV accelerator which has been installed in KAERI site. The 100MeV proton accelerator uses RF cavity to accelerate beams and need RF amplifier, klystron. To operate the klystron, a high power pulse power supply is required and the power supply system should have high quality because the reliability of the power supply has critical impact on the overall reliability of accelerator system. Therefore, high power pulse power system and related technology development are inevitable for 100MeV accelerator system development. 20MeV accelerator system has been developed and installed in KAERI site, which will be used as an injector for 100MeV accelerator and supply 20MeV beam to users. A study on the 20MeV accelerator characteristics should be performed to operate the machine efficiently. In addition, this machine can be used as a test bench for developing the 100MeV accelerator components. Therefore, not only the hardware so called 'high voltage power supply', but the related technology of the high quality high voltage power system and man power can be obtained from the results of this studies. The test results of the 20MeV accelerator can be utilized as a basis for efficient operation of 100MeV accelerator and these are the ultimate objective and necessities of the study

  4. Technical report on dc power supplies in nuclear power plants

    International Nuclear Information System (INIS)

    1977-06-01

    Emergency electrical power supplies, both a.c. and d.c. for nuclear power plants are important to safety. For this reason, the electric power systems for operating nuclear plants and those plants under licensing review have been required to provide a high degree of reliability. It is this high reliability that provides confidence that sufficient safety margin exists against loss of all d.c. power for extended periods of time to allow an orderly examination of safety issues, such as this. However, because of the importance of the a.c. and d.c. power systems, the staff has been expending effort to review the reliability of these systems and shall continue to do so in the future

  5. Complex approach to power supply system in the Tomsk region

    International Nuclear Information System (INIS)

    Meshcheryakov, V.N.; Bojko, V.I.; Koshelev, F.P.; Kolpakov, G.N.; Shamanin, I.V.

    2001-01-01

    The problem of power supply of the Tomsk region is under consideration. Power sources are compared with regard to economical and ecological effectiveness. It is shown that nuclear power industry is promising for the Tomsk region due to a unique nuclear park in a town of Seversk with developed scientific, industrial, skilled personnel and construction bases. It is noted that the construction of the NPP based on two WWER-640, WWER-1000 reactors of new generation permits solving the problem of power supply of the Tomsk region [ru

  6. INTERDEPENDENCE AND SECURITY OF ELECTRICITY SUPPLY OF A SMALL COUNTRY: THE CASE OF LITHUANIA

    Energy Technology Data Exchange (ETDEWEB)

    Juozaitis, R.; Bacauskas, A.

    2007-07-01

    In the report there are described the circumstances of operation of Lithuanian power system. A common plan of the Baltic power companies to build a new nuclear power plant is discussed. The report elaborates on the plans of necessary interconnections for integration of the Baltic power systems into the EU electricity market, ensuring security of supply in the Baltic region and availability to install efficient bigger capacity generation units in power stations. The experience of Lithuania demonstrates that interdependence in power sector is an advantage in maintaining security of electricity supply. (auth)

  7. 20% wind by 2030: Overcoming the challenge - U.S. wind supply chain bottlenecks

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Meghan

    2010-09-15

    The U.S. Department of Energy (DOE) provided PowerAdvocate with funding to evaluate the challenges facing the supply chain and provide strategic solutions to overcoming the short and long term supply chain challenges. PowerAdvocate conducted market research and interviews with wind developers, turbine and component suppliers and offshore wind development experts. PowerAdvocate created a comprehensive model. The model includes labor statistics, wind facility cost forecasting, and component supplier manufacturing investments in order to estimate the total cost to build a supply chain that supports the DOE's 20% by 2030 wind installation goal.

  8. A study of supply-chain capabilities in the Canadian wind power industry

    International Nuclear Information System (INIS)

    Wittholz, H.; Pan, D.

    2004-11-01

    In recent years, Canadian wind energy has developed to a total installed capacity of 439 MW. It is possible that by 2012, the cumulative installed wind power capacity may reach 5,600 MW, representing an investment of $8.4 billion. This analysis of the supply-chain structure in the life cycle of a wind farm identified many potential areas where Canadian companies can offer services. Opportunities for both manufacturers and service providers were presented. It was emphasized that although wind energy is a growth industry, Canada has not participated in the development and commercialization of large wind turbine technology. The technical barriers facing Canadian suppliers regarding wind turbine generator (WTG) assembly and component manufacturing were presented. Currently, Canada imports all large WTGs and components. In order to maximize benefits to the Canadian economy, it was recommended that Canadian companies acquire European technology through licences, joint ventures or foreign investment. Technology transfer funding, training and technical assistance funding, tax incentives for capital equipment and support to universities and colleges were also recommended. It was suggested that Canadian companies should focus on manufacturing rotor blades, towers, base frames, nacelle covers and spinners, flexible drive shafts, disk brakes, vibration mounts, inverters, control cabinets, and generators. tabs., figs

  9. An Upgraded Front-End Switching Power Supply Design For the ATLAS TileCAL Detector of the LHC

    CERN Document Server

    Drake, Gary; The ATLAS collaboration

    2011-01-01

    We present the design of an upgraded switching power supply brick for the front-end electronics of the ATLAS hadron tile calorimeter (TileCAL) at the LHC. The new design features significant improvement in noise, improved fault detection, and generally a more robust design, while retaining the compact size, water-cooling, output control, and monitoring features in this 300 KHz design. We discuss the improvements to the design, and the radiation testing that we have done to qualify the design. We also present our plans for the production of 2400 new bricks for installation on the detector in 2013.

  10. An Upgraded Front-End Switching Power Supply Design for the ATLAS TileCAL Detector of the LHC

    CERN Document Server

    Drake, G; The ATLAS collaboration; De Lurgio, P; Henriques, A; Minashvili, I; Nemecek, S; Price, L; Proudfoot, J; Stanek, R

    2011-01-01

    We present the design of an upgraded switching power supply brick for the front-end electronics of the ATLAS hadron tile calorimeter (TileCAL) at the LHC. The new design features significant improvement in noise, improved fault detection, and generally a more robust design, while retaining the compact size, water-cooling, output control, and monitoring features in this 300 KHz design. We discuss the improvements to the design, and the radiation testing that we have done to qualify the design. We also present our plans for the production of 2400 new bricks for installation on the detector in 2013.

  11. Design of Intelligent Power Supply System for Expressway Tunnel

    Science.gov (United States)

    Wang, Li; Li, Yutong; Lin, Zimian

    2018-01-01

    Tunnel lighting program is one of the key points of tunnel infrastructure construction. As tunnels tend to handle remote locations, power supply line construction generally has been having the distance, investment, high cost characteristics. To solve this problem, we propose a green, environmentally friendly, energy-efficient lighting system. This program uses the piston-wind which cars within tunnel produce as the power and combines with solar energy, physical lighting to achieve it, which solves the problem of difficult and high cost of highway tunnel section, and provides new ideas for the future construction of tunnel power supply.

  12. Magnet power supply system for the ALS storage ring and booster

    International Nuclear Information System (INIS)

    Jackson, L.T.; Luchini, K.; Lutz, I.

    1993-05-01

    The Magnet Power Supply System is described by specification, design, hardware, and operating experience. A unique system for the one Hz, 1.5 GeV Booster, where the wideband QF and QD power supplies track the dipole current to within 0.1% at injection will be detailed. AC distribution system considerations related to inverting the stored energy of the booster magnet back into power grid will be discussed. The rational for linear correctors and individual quad supplies (225 total units) will be placed within the context of the storage-ring requirements

  13. Control strategy research of two stage topology for pulsed power supply

    International Nuclear Information System (INIS)

    Shi Chunfeng; Wang Rongkun; Huang Yuzhen; Chen Youxin; Yan Hongbin; Gao Daqing

    2013-01-01

    A kind of pulsed power supply of HIRFL-CSR was introduced, the ripple and the current error of the topological structure of the power in the operation process were analyzed, and two stage topology of pulsed power supply was given. The control strategy was simulated and the experiment was done in digital power platform. The results show that the main circuit structure and control method are feasible. (authors)

  14. Studies of works management and automation of nuclear power installations

    International Nuclear Information System (INIS)

    Besch, P.; Grossmann, J.; Hollasky, R.

    1989-01-01

    Erection and operation of nuclear power installations require investigations on their safety and availability. The works performed on the management of nuclear power plants and nuclear heating stations in the Working Group on Automation Engineering of the Dresden University of Technology are presented. Emphasis of the works is on simulation of dynamical performance of the plants and studies on the utilization of novel techniques concerning plant automation and process management. (author)

  15. Latin America: market mechanisms and supply adequacy in power sector reforms

    Energy Technology Data Exchange (ETDEWEB)

    Hammons, T.J. [University of Glasgow, Glasgow (United Kingdom); Barroso, L.A. [PSR, Rio de Janeiro (Brazil); Rudnick, H. [Pontificia Universidad Catolica de Chile, Santiago (Chile)

    2011-03-15

    The process of transformation in government and operations in the power sector leads to interaction between increasing integrated markets and public agencies in charge of policy making, regulation and control. This is examined for Latin America where state and marketing power sector planning, contract auctions to assure supply adequacy in an uncertain market environment, cross-border contracts, financing challenges for generation investments, and auctions of contracts to secure supply adequacy in the second stage of power sector reform are discussed. First, the state and market in power sector planning reform and state policies in Latin America are considered. Here, present concerns; the state-market relationship (the position of regulation, globalisation, internationalisation), and state market in the energy sector (correction and adjustments) are reviewed. Case studies for Argentina and Brazil are briefly outlined. The paper then examines contract auctions to assure supply adequacy in an uncertain energy environment that are being explored to face supply problems over recent years in the Chilean electricity market, taking into account the unexpected restrictions in natural gas transfers from Argentina. Also discussed are supply adequacy mechanisms and cross-border contracts in the Central American regional electricity market including firm transmission rights and financing challenges for generation investments. The final part of the paper discusses auctions of contracts and energy call options to ensure supply adequacy in the Brazilian power sector reform. Here, first stage of power sector reform, what went wrong, the second stage of reform and the move towards energy supply auctions, energy supply auctions so far and what's next in the challenges of environmental constraints and electricity-gas integration are reviewed. The reform being proposed to the electric regulatory framework for wholesale transactions in Peru is also reviewed. Considered are bids for

  16. Dipole power supply for National Synchrotron Light Source Booster upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1992-01-01

    The booster at the NSLS is being upgraded from .75 to 2 pulses per second. To accomplish this, new power supplies for the dipole, quadrupole, and sextupole magnets have been designed and are being constructed. This paper will outline the design of the dipole power supply and control system, and will present results obtained thus far

  17. Ring magnet power supply for a 500 MeV synchrotron

    International Nuclear Information System (INIS)

    Praeg, W.F.; McGhee, D.

    1978-01-01

    The ring magnets of a 500 MeV synchrotron at Argonne National Laboratory (ANL) are excited with a dc bias of 2300 A modulated by a 30 Hz sinewave current of 1300 A peak. To do this economically two commercial 500-kW 12-phase dc power supplies were modified to perform like a 1 MVA power amplifier with a frequency response from dc to approximately 60 Hz. This paper describes the design of the ring magnet power supply

  18. 49 CFR 236.206 - Battery or power supply with respect to relay; location.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Battery or power supply with respect to relay..., AND APPLIANCES Automatic Block Signal Systems Standards § 236.206 Battery or power supply with respect to relay; location. The battery or power supply for each signal control relay circuit, where an open...

  19. Improvements in electric power supply in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Minovskii, Yu.P.; Nabokov, Eh.P.; Savel' ev, G.P.

    1985-01-01

    Reviews measures taken by major coal producing countries to increase output levels. Discusses research carried out into advance design of equipment in FRG, UK, USA and France and proposes establishment of central automatic control of electric power supply system in Soviet mines, improvement in underground power supply equipment, increase in reliability, stabilization of standby capacity in low voltage circuits, maintenance-free electrical equipment, and efficient spare part storage in underground workings. States that introduction of the proposed system (details are given) will ensure that Soviet mines will eventually reach the development level of foreign mines. 2 refs.

  20. Climate protection and reliability of supply. Development of a sustainable power supply concept; Klimaschutz und Versorgungssicherheit. Entwicklung einer nachhaltigen Stromversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Klaus, Thomas; Loreck, Charlotte; Mueschen, Klaus

    2009-09-15

    Germany, like other states, committed itself to sustainable development in the Rio declaration of 1992. The boundary conditions for this are set by nature itself, whose laws must be respected if goals like reliability of supply and economic efficiency are to be achieved. This study of the Federal Environmental Office shows how sustainable power supply can be achieved. It is possible to combine climate protection, reliability of supply and economic efficiency, even without nuclear power and without constructing new conventional power plants that do not have the function of combined heat and power generation. (orig.)

  1. Development of an amorphous surge blocker for a high voltage acceleration power supply of the neutral beam injectors

    International Nuclear Information System (INIS)

    Mizuno, Makoto; Ohara, Yoshihiro; Watanabe, Kazuhiro; Ozaki, Akira.

    1993-10-01

    An amorphous surge blocker for a high voltage acceleration power supply for the neutral beam injectors has been developed. Since the saturation magnetic flux density of the amorphous core is higher than that of the ferrite core, the surge blocker made of amorphous cores can be reduced in size appreciably compared to the conventional ferrite surge blocker. A 350 kV, 0.05 volt-second amorphous surge blocker was designed, fabricated and tested. The amorphous core was made by winding an amorphous tape with a film for the layer insulation and was heat-treated to recover the magnetic characteristics. The core is molded by epoxy resin and installed in a FRP insulator tube filled with SF 6 gas for the insulation. The volt-second measured was higher than the designed value and the electrical breakdown along the cores and between layers was not observed. This test result shows that the amorphous surge blocker is applicable for a dc acceleration power supply for high energy neutral beam injectors. (author)

  2. Transient evaluation using EMTP at single open phase with the offsite power transformer for the emergency power supply systems of nuclear power plants

    International Nuclear Information System (INIS)

    Shimada, Yoshio

    2017-01-01

    The emergency power supply systems of nuclear power plants, as the objects of this research, are critical in supplying stable electric power to such systems as the emergency core cooling system (ECCS), and in maintaining safety of the nuclear power reactor; this was apparent in the accident at the Fukushima Daiichi Nuclear Power Station. The Nuclear Regulatory Commission (USNRC) issued regulatory documents (BL 2012-011, IN 2012-032), and has commenced evaluations on newly discovered vulnerability in the design of power supply systems which cannot be detected with under-voltage protection relays, with certain kinds of configuration of coils and iron core structures, such as when the offsite power supply side is a Y-connection and the load side is a ⊿-connection etc., when the detection of single open phase fault with the circuit of a transformer which is without a ground fault connected to the offsite power supply system. This report uses simulation by the electro magnetic transients program (EMTP) and clearly describe the response at the time of the power supply single open phase without ground fault for various configuration of coils and various iron core structures of the three-phase transformer, and identify the important issues in the response of emergency power supply systems and the safety related components of representative domestic PWR plants when the single open phase fault occurred without ground fault. This report describes the results of the simulations of operations of the protection relays of the emergency power supply systems and the safety related components of representative a domestic PWR plant with EMTP. This report explains the method to detect open-phase when the transformer is no-load which United States Electric Power Research Institute (EPRI) developed. As the detailed analyses data from EPRI related to the detection method concerned have not been disclosed officially yet, in this paper, the quantitative and detailed verification results

  3. France liberalizes its power supply market

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    The French market of power supply to companies is now free. This means that Electricite de France (EdF), the first world electric utility now has competitors in its domestic market. This is an important challenge for EdF because 3 millions of clients (70% of the French power consumption) are now concerned by the opening of the power market. According to A. Merlin, head of the energy transportation network (RTE), the opening of the market does not increase the risk of black-out, it just makes the operation of power networks more complex. The implementation of a single power transportation company (RTE) simplifies the mastery of networks safety but the development of investments is necessary to ensure the maintenance of 400 kV power lines. A comparison of the situation of power market liberalization is made for 6 countries (Germany, UK, Spain, US, Netherlands and Italy). Short paper. (J.S.)

  4. Design for the power-supply controller base on embedded operating system

    International Nuclear Information System (INIS)

    Guo Yuhui; Chinese Academy of Sciences, Beijing; Wang Yanyu; Qiao Weimin; Huang Jijiang; Lin Feiyu

    2008-01-01

    In order to realize the power-supply equipment long-distance monitor, adopts embedded RTOS (NutOS) and the TCP/1P protocol power-supply controller. Independently designs partially the software and hardware, through socket programming system long-distance control is realized. (authors)

  5. The Environment Friendly Power Source for Power Supply of Mobile Communication Base Stations

    Science.gov (United States)

    Rudenko, N. V.; Ershov, V. V.; Evstafiev, V. V.

    2017-05-01

    The article describes the technical proposals to improve environmental and resource characteristics of the autonomous power supply systems of mobile communication base stations based on renewable energy sources, while ensuring the required reliability and security of power supply. These include: the replacement of diesel-generator with clean energy source - an electrochemical generator based on hydrogen fuel cells; the use of wind turbines with a vertical axis; use of specialized batteries. Based on the analysis of the know technical solutions, the structural circuit diagram of the hybrid solar-wind-hydrogen power plant and the basic principles of the algorithm of its work were proposed. The implementation of these proposals will improve the environmental and resource characteristics.

  6. Transient Processes in Electric Power Supply System for Oil Terminal with Own Gas-Turbine Power Station

    Directory of Open Access Journals (Sweden)

    A. M. Hаshimov

    2009-01-01

    Full Text Available The paper contains results of the investigations concerning influence of symmetrical and non-symmetrical short circuits at main power network on electric power supply system of a huge oil terminal which is powered by own gas-turbine power station. Calculations have been made in accordance with the IEC and IEEЕ requirements. Estimations for voltage level and distribution of short circuit current in the electric power supply system of the Sangachal oil terminal being operated in parallel with the AzerEnerji grid are presented in the paper

  7. Conflict nuclear power. Theses for current supply with and without nuclear power

    International Nuclear Information System (INIS)

    Schwarz, E.

    2007-01-01

    In the context of a lecture at the 2nd Internationally Renewable Energy Storage Conference at 19th to 21st November, 2007, in Bonn (Federal Republic of Germany), the author of the contribution under consideration reports on theses for current supply with and without nuclear power. (1) Theses for current supply with nuclear energy: Due to a relative amount of 17 % of nuclear energy in the world-wide energy production and due to the present reactor technology, the supplies of uranium amount nearly 50 to 70 years. The security of the nuclear power stations is controversially judged in the public and policy. In a catastrophic accident in a nuclear power station, an amount of nearly 2.5 billion Euro is available for adjustment of damages (cover note). The disposal of radioactive wastes is not solved anywhere in the world. The politically demanded separation between military and civilian use of the nuclear energy technology is not possible. The exit from the nuclear energy is fixed in the atomic law. By any means, the Federal Republic of Germany is not insulated in the European Union according to its politics of nuclear exit. After legal adjustment of the exit from the nuclear energy the Federal Republic of Germany should unfold appropriate activities for the re-orientation of Euratom, Nuclear Energy Agency and the International Atomic Energy Agency. The consideration of the use of nuclear energy in relation to the risks has to result that its current kind of use is not acceptable and to be terminated as fast as possible. (2) Theses for current supply without nuclear energy: The scenario technology enables a transparency of energy future being deliverable for political decisions. In accordance with this scenario, the initial extra costs of the development of the renewable energies and the combined heat and power generation amount approximately 4 billion Euro per year. The conversion of the power generation to renewable energies and combined heat and power generation

  8. Test and maintenance of the emergency power supply in the nuclear power plant Biblis

    International Nuclear Information System (INIS)

    Kotthoff, K.; Huren, H.

    1986-01-01

    Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)

  9. Test and maintenance of the emergency power supply in the nuclear power plant Biblis

    Energy Technology Data Exchange (ETDEWEB)

    Kotthoff, K. [Gesellschaft fuer Reaktorsicherheit - GRS mbH, Schwertnergasse 1, D-5000 Koeln 1, Cologne (Germany); Huren, H. [Rheinisch-Westfaelisches Elektrizitaetswerk AG, Betriebsverwaltung Biblis, Biblis (Germany)

    1986-02-15

    Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)

  10. Optimum Arrangement of Reactive Power Sources While Using Genetic Algori

    Directory of Open Access Journals (Sweden)

    A. M. Gashimov

    2010-01-01

    Full Text Available Reduction of total losses in distribution electricity supply network is considered as an important measure which serves for improvement of efficiency of electric power supply systems. This objective can be achieved by optimum distribution of reactive power sources in proper places of distribution electricity supply network. The proposed methodology is based on application of a genetic algorithm. Total expenses for installation of capacitor banks, their operation and also expenses related to electric power losses are considered as an efficiency function which is used for determination of places with optimum values of capacitor bank power. The methodology is the most efficient for selection of optimum places in the network where it is necessary to install capacitor banks with due account of their power control depending on a switched-on load value in the units.

  11. Simulation as a key to success in power supply design and development

    Energy Technology Data Exchange (ETDEWEB)

    Suur-Askola, S.; Laasonen, M.; Maeki, J. [Efore Muuntolaite Oy, Vantaa (Finland)

    1997-12-31

    This paper describes the design and development process of a power supply by using simulation methods. The simulation principles and results of a 40W power supply are provided including EMI, voltage and current rating verification as well as power loss approximation. (orig.) 8 refs.

  12. Effect of distributed generation installation on power loss using genetic algorithm method

    Science.gov (United States)

    Hasibuan, A.; Masri, S.; Othman, W. A. F. W. B.

    2018-02-01

    Injection of the generator distributed in the distribution network can affect the power system significantly. The effect that occurs depends on the allocation of DG on each part of the distribution network. Implementation of this approach has been made to the IEEE 30 bus standard and shows the optimum location and size of the DG which shows a decrease in power losses in the system. This paper aims to show the impact of distributed generation on the distribution system losses. The main purpose of installing DG on a distribution system is to reduce power losses on the power system.Some problems in power systems that can be solved with the installation of DG, one of which will be explored in the use of DG in this study is to reduce the power loss in the transmission line. Simulation results from case studies on the IEEE 30 bus standard system show that the system power loss decreased from 5.7781 MW to 1,5757 MW or just 27,27%. The simulated DG is injected to the bus with the lowest voltage drop on the bus number 8.

  13. Preliminary study of low carbon power demand and supply toward 2030

    International Nuclear Information System (INIS)

    Ogimoto, Kazuhiko; Ikeda, Yuichi; Kataoka, Kazuto; Ikegami, Takashi; Akai, Makoto

    2012-01-01

    It takes tens of years to realize the sustainable economy through reformation of energy infrastructure. The share of the electric power in the total energy increases, as the energy efficiency technologies of buildings and transportation and renewable energy technologies are of power technologies. Under these circumstances, it is necessary to deploy the long-term power demand-supply analysis and the long-term power system augmentation analysis so that the augmentation should be optimized and robust under various uncertainties so as to fulfill the criteria of security, economy and environmental. This paper, utilizing a long-range power system demand and supply model, ESPRIT, evaluates several scenarios with several options of nuclear. RE deployment, and thermal generation reinforcement based on the indicators such as self-sufficiency, economy, and environment to pursue the best demand-supply mix. (author)

  14. Quality assurance for CMS Tracker LV and HV Power Supplies

    CERN Document Server

    Costa, Marco; Sertoli, M; Trapani, P; Periale, L; Isabella, L; Landi, C; Lucchesi, A

    2007-01-01

    This work describes the quality assurance measurements that have been carried out on about 2000 Power Supply Units produced in CAEN technology for the CMS Silicon Tracker Detector. The automate procedure and the characteristics of the dedicated Test Fixture developed for this activity are described in details. Magnetic field tolerance and radiation hardness of Tracker power supply units is also discussed at length.

  15. Demand for power in Calcutta Electricity Supply Corporation area

    Energy Technology Data Exchange (ETDEWEB)

    Banerjee, N

    1980-07-01

    Since the early 1970's there has been a continuous crisis of power supply to the Calcutta industrial region. Historical records show that only the peak demand has grown and has a potential for growth, which, with an unchanging base demand, results in a low load factor and consequently inefficient power system operation. Attempts to shift industrial loads by operating industrial plants during non-peak hours are described. Adverse economic conditions eliminated the need for extra working shifts. It is concluded that the power system supplying the Calcutta region has an insufficient peak load generating capacity and an uneconomic load curve and that stricter hourly schedules for power use by industries should be adhered to in order to minimize these problems. (LCL)

  16. Sparking protection for MFTF-B Neutral Beam Power Supplies

    International Nuclear Information System (INIS)

    Cummings, D.B.

    1983-01-01

    This paper describes the upgrade of MFTF-B Neutral Beam Power Supplies for sparking protection. High performance ion sources spark repeatedly so ion source power supplies must be insensitive to sparking. The hot deck houses the series tetrode, arc and filament supplies, and controls. Hot deck shielding has been upgraded and a continuous shield around the arc, filament, gradient grid, and control cables now extends from the hot deck, through the core snubber, to the source. The shield carries accelerating current and connects only to the source. Shielded source cables go through an outer duct which now connects to a ground plane under the hot deck. This hybrid transmission line is a low inductance path for sparks discharging the stray capacitance of the hot deck and isolation transformers, reducing coupling to building steel. Parallel DC current return cables inside the duct lower inductance to reduce inductive turn-off transients. MOVs to ground further limit surges in the remote power supply return. Single point grounding is at the source. No control or rectifier components have been damaged nor are there any known malfunctions due to sparking up to 80 kV output

  17. Sparking protection for MFTF-B neutral beam power supplies

    International Nuclear Information System (INIS)

    Cummings, D.B.

    1983-01-01

    This paper describes the upgrade of MFTF-B Neutral Beam Power Supplies for sparking protection. High performance ion sources spark repeatedly so ion source power supplies must be insensitive to sparking. The hot deck houses the series tetrode, arc and filament supplies, and controls. Hot deck shielding has been upgraded and a continuous shield around the arc, filament, gradient grid, and control cables now extends from the hot deck, through the core snubber, to the source. The shield carries accelerating current and connects only to the source. Shielded source cables go through an outer duct which now connects to a ground plane under the hot deck. This hybrid transmission line is a low inductance path for sparks discharging the stray capacitance of the hot deck and isolation transformers, reducing coupling to building steel. Parallel dc current return cables inside the duct lower inductance to reduce inductive turn-off transients. MOVs to ground further limit surges in the remote power supply return. Single point grounding is at the source. No control or rectifier components have been damaged nor are there any known malfunctions due to sparking up to 80 kV output

  18. Power of Companies in Supply Chains and Their Effect on Network Development

    Directory of Open Access Journals (Sweden)

    Tamás Brányi

    2015-01-01

    Full Text Available A general supply chain functions as a closed cluster and consists of at least three companies: supplier, producer and buyer. In an optimal case the companies within a supply chain are well integrated, partnership rests on trust which results in common strategic decisions. Business practices show that there is a stronger company within the chain that uses its power position to influence network development. The objective of the research is to measure how and what kind of power position is needed to influence the supply chain. The hypothesis states, that power and network development are opposite effects in a supply chain. Statistical examination of data gained from 221 companies state that the company with power position has advantages if the supply chain extends. SPSS analysis proves that the hypothesis is false and opens a new direction of research. Companies within the supply chain have to cope with power structures while cooperating with each other. They tend to look for solutions to ease dependency. Using or misusing power has several factors; mainly they are inherited from the strongest link of the supply chain. This is usually a problem but the results of the statistical analysis show that still a win-win situation is needed for the companies in order to deepen the cooperation. To conclude this research the data shows that the goal is to be more competitive as a chain, not just as a company.

  19. High-Bandwidth, High-Efficiency Envelope Tracking Power Supply for 40W RF Power Amplifier Using Paralleled Bandpass Current Sources

    DEFF Research Database (Denmark)

    Høyerby, Mikkel Christian Wendelboe; Andersen, Michael Andreas E.

    2005-01-01

    This paper presents a high-performance power conversion scheme for power supply applications that require very high output voltage slew rates (dV/dt). The concept is to parallel 2 switching bandpass current sources, each optimized for its passband frequency space and the expected load current....... The principle is demonstrated with a power supply, designed for supplying a 40 W linear RF power amplifier for efficient amplification of a 16-QAM modulated data stream...

  20. Performance and modelling of 70kVdc power supply with solid-state crowbar

    International Nuclear Information System (INIS)

    Yellamraju, Sham Sunder Srinivas; Kulkarni, Sanjay V.

    2013-01-01

    The experimental activities of tokamak research involve development of high power RF and microwave sources for fusion related heating and current drive applications. High power RF and microwave tubes like Klystron, Gyrotron and Tetrode are in general operated with high voltage DC power supplies. These HVDC power supplies of the order of 70 kVdc, must be equipped with necessary arc fault protection in addition to general over current and over voltage protection. The arc fault protection must act within few microseconds to prevent permanent damage to the RF tube, window, etc. When an arc fault is detected, output voltage of the DC power supply is short circuited using a crowbar device (generally Ignitron, Thyratron, thyristor, rail-gap, etc.) that operates in few microseconds. This diverts the fault current from the load to crowbar device, thereby protecting the load. This is necessary as conventional protection in the power supply input takes ∼100 ms to switch-off. The crowbar device must be able to take the fault current till the circuit breaker placed at power supply input is switched off. The arc fault protection is tested for its effectiveness by “wire-burn” test. Full power short circuit of ∼1.5 MW DC power supply puts enormous stress on the power supply, utility and the crowbar, therefore frequent wire-burn testing is to be avoided. This report presents simulation of wire-burn test using PSIM software. Optimization of the component values without conducting actual wire-burn test could be achieved

  1. Performance and modelling of 70kVdc power supply with solid-state crowbar

    Energy Technology Data Exchange (ETDEWEB)

    Yellamraju, Sham Sunder Srinivas, E-mail: ysssrinivas@gmail.com [Institute for Plasma Research, BHAT, Gandhinagar 382428 (India); Kulkarni, Sanjay V. [Institute for Plasma Research, BHAT, Gandhinagar 382428 (India)

    2013-10-15

    The experimental activities of tokamak research involve development of high power RF and microwave sources for fusion related heating and current drive applications. High power RF and microwave tubes like Klystron, Gyrotron and Tetrode are in general operated with high voltage DC power supplies. These HVDC power supplies of the order of 70 kVdc, must be equipped with necessary arc fault protection in addition to general over current and over voltage protection. The arc fault protection must act within few microseconds to prevent permanent damage to the RF tube, window, etc. When an arc fault is detected, output voltage of the DC power supply is short circuited using a crowbar device (generally Ignitron, Thyratron, thyristor, rail-gap, etc.) that operates in few microseconds. This diverts the fault current from the load to crowbar device, thereby protecting the load. This is necessary as conventional protection in the power supply input takes ∼100 ms to switch-off. The crowbar device must be able to take the fault current till the circuit breaker placed at power supply input is switched off. The arc fault protection is tested for its effectiveness by “wire-burn” test. Full power short circuit of ∼1.5 MW DC power supply puts enormous stress on the power supply, utility and the crowbar, therefore frequent wire-burn testing is to be avoided. This report presents simulation of wire-burn test using PSIM software. Optimization of the component values without conducting actual wire-burn test could be achieved.

  2. Power supplies in 14 UD pelletron accelerator and its control (Paper No. CP 12)

    International Nuclear Information System (INIS)

    Vaze, M.Y.; Bhalerao, P.J.; Tambvekar, V.V.

    1990-01-01

    14UD Pelletron is a 14 million volt tandem heavy ion accelerator. For generation of the accelerating voltage, heavy ion beams and transporting the beam through low energy injector systems, accelerator, high energy system, analysing magnets and finally upto the target different types of types of D.C. power supplies with varying capacity and specifications are used in this accelerator. Broadly these power supplies can be classified in three different types: (1)D.C. high voltage low current voltage regulated supplies, (2)Low voltage high current current regulated high precision D.C. power supplies, and (3)Medium power current regulated D.C. power supplies. These power supplies are described and systems where they are used are mentioned. They are interfaced with CAMAC module and are controlled and monitored remotely from the control room through the serial highway link. (author). 2 figs

  3. Digitalizing upgrade of the power supplies for the extraction septum magnets in HIRFL-CSR

    International Nuclear Information System (INIS)

    Zhao Jiang; Zhang Huajian; Wu Fengjun; Yuan Zhendong; Chen Youxin; Huang Yuzhen; Gao Daqing

    2014-01-01

    This paper introduces the working principle of the power supplies for the septum magnets in HIRFL-CSR and presents a feasible scheme of digitalizing these power supplies. The scheme employed the SOPC (system-on-a-programmable-chip) technology based on FPGA, the software framework of NIOSII and the polycyclic adjustment algorithm realized by the hardware description language. Then, several key problems that could be encountered in realizing the power supply control algorithm on FPGA were discussed. After the power supplies were upgraded, the beam of HIRFL-CSR was extracted more reliably and the stability of beam spot position at the experimental terminals has been obviously improved. This work would provide a valuable reference for the engineers of digitalizing other magnetic power supplies in HIRFL-CSR and of developing magnetic power supplies for heavy ion cancer therapy. (authors)

  4. Expert systems for space power supply: design, analysis, and evaluation

    International Nuclear Information System (INIS)

    Cooper, R.S.; Thomson, M.K.; Hoshor, A.

    1987-01-01

    The authors evaluated the feasibility of applying expert systems to the conceptual design, analysis, and evaluation of space power supplies in particular, and complex systems in general. To do this, they analyzed the space power supply design process and in associated knowledge base, and characterized them in a form suitable for computer emulation of a human expert. The existing expert system tools and the results achieved with them were evaluated to assess their applicability to power system design. They applied some new concepts for combining program architectures (modular expert systems and algorithms) with information about the domain to create a deep system for handling the complex design problem. They authors developed, programmed and tested NOVICE, a code to solve a simplified version of a scoping study of a wide variety of power supply types for a broad range of missions, as a concrete feasibility demonstration

  5. Fault Analysis of ITER Coil Power Supply System

    International Nuclear Information System (INIS)

    Song, In Ho; Jun, Tao; Benfatto, Ivone

    2009-01-01

    The ITER magnet coils are all designed using superconductors with high current carrying capability. The Toroidal Field (TF) coils operate in a steadystate mode with a current of 68 kA and discharge the stored energy in case of quench with using 9 interleaved Fast Discharge Units (FDUs). The Central Solenoid (CS) coils and Poloidal Field (PF) coils operate in a pulse mode with currents of up to 45 kA and require fast variation of currents inducing more than 10 kV during normal operation on the coil terminals using Switching Network (SN) systems (CSs, PF1 and 6) and Booster and VS converters (PF2 to 5), which are series connected to Main converters. SN and FDU systems comprise high current DC circuit breakers and resistors for generating high voltage (SN) and to dissipate magnetic energy (FDUs). High transient voltages can arise due to the switching operation of SN and FD and the characteristics of resistors and stray components of DC distribution systems. Also, faults in power supply control such as shorts or grounding faults can produce higher voltages between terminals and between terminal and ground. Therefore, the design of the coil insulation, coil terminal regions, feeders, feed throughs, pipe breaks and instrumentation must take account of these high voltages during normal and abnormal conditions. Voltage insulation level can be defined and it is necessary to test the coils at higher voltages, to be sure of reliable performance during the lifetime of operation. This paper describes the fault analysis of the TF, CS and PF coil power supply systems, taking account of the stray parameter of the power supply and switching systems and inductively coupled superconducting coil models. Resistor grounding systems are included in the simulation model and all fault conditions such as converter hardware and software faults, switching system hardware and software faults, DC short circuits and single grounding faults are simulated. The occurrence of two successive faults

  6. Study on a Highly Stabilized Power Supply for Hybrid-Magnet Superconducting Outsert

    International Nuclear Information System (INIS)

    Wu Jinglin; Long Jiaojiao; Liu Xiaoning

    2014-01-01

    The superconducting outsert of the 40 T hybrid-magnet in High Magnetic Field Laboratory (HMFL) of Chinese Academy of Sciences (CAS) requires a highly stabilized power supply. In this paper, two kinds of power supply design are briefly presented and both advantages and disadvantages are analyzed. In order to overcome the drawbacks of switching power supply, a series regulated active filter is adopted and a new design is proposed which ensures cooperative relationship between the feedback control loops of the switching converter and the series regulated active filter. Besides, unlike the traditional switching power supply, which can generate positive voltage only, this new design can also generate negative voltage which is needed in the quench protection for the superconducting magnet. In order to demonstrate the effectiveness of the methodology, a low-power prototype has been accomplished. The simulation and experiment results show that the power supply achieves high precision under the combined action of two feedback control loops. The peak-to-peak amplitude of the output ripple voltage of the prototype is 0.063%, while the peak-to-peak amplitude of the output ripple current is 120 ppm. (fusion engineering)

  7. Protective and control relays as coal-mine power-supply ACS subsystem

    Science.gov (United States)

    Kostin, V. N.; Minakova, T. E.

    2017-10-01

    The paper presents instantaneous selective short-circuit protection for the cabling of the underground part of a coal mine and central control algorithms as a Coal-Mine Power-Supply ACS Subsystem. In order to improve the reliability of electricity supply and reduce the mining equipment down-time, a dual channel relay protection and central control system is proposed as a subsystem of the coal-mine power-supply automated control system (PS ACS).

  8. The AGS Booster main ring power supply system

    International Nuclear Information System (INIS)

    Soukas, A.; Hughes, K.; Sandberg, J.; Toldo, F.; Zhang, S.Y.

    1989-01-01

    The AGS Booster is being designed as a very versatile particle accelerator. Its primary function is to be a high quality injector to the currently operating Alternating Gradient Synchrotron (AGS). The Booster/AGS combination will produce proton intensities greater than 5 x 10 13 protons per pulse (ppp), and accelerate heavy ions, with mass up to 200, to a maximum energy of 15 GeV per atomic mass unit (GeV/amu). The power supply for the Booster Main Ring (BMRPS) has to accommodate a wide range of cycles and a wide range of operating parameters. The cycles range from storage for several seconds to rapid cycling at 7.5 Hz. The peak output power is 18 MW. This paper will describe the AGS Booster machine powering requirements, the choice of power supply, the a.c. circuit tie-in and its associated problems and some of the details of the design of the BMRPS. 9 refs., 2 figs

  9. Market design and supply security in imperfect power markets

    International Nuclear Information System (INIS)

    Schwenen, Sebastian

    2014-01-01

    Supply security in imperfect power markets is modelled under different market designs. In a uniform price auction for electricity with two firms, strategic behaviour may leave firms offering too few capacities and unable to supply all realized demand. Market design that relies on capacity markets increases available generation capacities for sufficiently high capacity prices and consequently decreases energy prices. However, equilibrium capacity prices are non-competitive. Capacity markets can increase security of supply, but cannot mitigate market power, which is exercised in the capacity market instead of the energy market. - Highlights: • I model two power generating firms who compete to serve stochastic demand in a multiunit uniform price auction. • In equilibrium, blackout probabilities can arise through capacity withholding. • Capacity mechanisms decrease capacity withholding and the expected energy price. • With dominant firms, capacity mechanisms are only effective if capacity prices are non-competitive and include a mark-up for leaving the energy-only market optimum

  10. Construction and qualification of the Power Supply system of the AMS-02 Tracker detector

    International Nuclear Information System (INIS)

    Menichelli, M.; Accardo, L.; Ambrosi, G.; Battiston, R.; Bizzarri, M.; Blasko, S.; Cosson, D.; Fiori, E.M.; Maris, O.; Papi, A.; Scolieri, G.

    2007-01-01

    The AMS-02 Tracker power supply system, described in this paper, has been designed optimizing noise performances, modularity and efficiency. The power is distributed starting from a 28V line coming from the power distribution system is converted into the needed voltages by means of DC-DC converters, and for bias supply and front-end voltages is post-regulated by means of linear regulators. Components Off The Shelf (COTS) have been extensively used in the construction of this power supply, however various radiation test campaigns have been performed in order to verify the reliability of these components. The power supply architecture developed for the tracker detector has been used as a guideline for the development of the power supplies for the other detectors in the experiment

  11. Exporting Australia's remote area power supply industry

    International Nuclear Information System (INIS)

    Presnell, K.

    2001-01-01

    The Australian renewable energy industry has two faces: Remote Area Power Supply systems (RAPS), where the trade-off is between the traditional diesel generator and diesel hybrid or the stand alone renewable energy system. The competency of the Australian RAPS industry is recognised internationally. Grid connected renewable energy technologies, where industry activity is expanding rapidly, but where Australian competencies carry relatively little weight internationally (other than for research and development of related components such as big performance, crystalline silicon photovoltaic cells). Individual industry development strategies are required in each instance. The focus of this paper is on strategies that enhance the export potential of the Australian RAPS industry. Involvement of the electricity supply utilities is promoted as a means of quickly instituting a substantial industry presence. The term RAPS can be confusing. It is used to describe any supply system serving a remote user, be they a single property owner with a simple, stand alone DC photovoltaic supply, or several communities with complex, inter-connected, diesel/hybrid power stations, sometimes termed a 'remote-grid'. Utility interest tends to emerge as market fragmentation decreases, system complexity increases and economies of scale become evident. A review of the domestic situation is a necessary adjunct to development of export strategies for Australian RAPS products. The two are inexorably linked, as is reflected in the format of this paper. (author)

  12. Application of embedded database to digital power supply system in HIRFL

    International Nuclear Information System (INIS)

    Wu Guanghua; Yan Huaihai; Chen Youxin; Huang Yuzhen; Zhou Zhongzu; Gao Daqing

    2014-01-01

    Background: This paper introduces the application of embedded MySQL database in the real-time monitoring system of the digital power supply system in Heavy Ion Research Facility in Lanzhou (HIRFL). Purpose: The aim is to optimize the real-time monitoring system of the digital power supply system for better performance. Methods: The MySQL database is designed and implemented under Linux operation system running on ARM processor, together with the related functions for real-time data monitoring, such as collection, storage and query. All status parameters of digital power supply system is collected and communicated with ARM by a FPGA, whilst the user interface is realized by Qt toolkits at ARM end. Results: The actual operation indicates that digital power supply can realize the function of real-time data monitoring, collection, storage and so on. Conclusion: Through practical application, we have found some aspects we can improve and we will try to optimize them in the future. (authors)

  13. Danish electricity supply. Statistik 1999

    International Nuclear Information System (INIS)

    2000-07-01

    The Association of Danish Electric Utilities issues each year the statistical yearbook 'Danish electricity supply'. By means of brief text, figures, and tables a description is given of the electric supply sector. The total electric power consumption in 1999 is almost the same as in 1998. There has been a moderate consumption increase in the households and the service sector whereas the consumption in industry has decreased. 1999 is the first year with actual competition in the power-producing sector. The increased competition from the Scandinavian hydro-electric power plants and the growing number of privately owned wind turbines and other decentralised power plants result in a decline in the power production at the electric utilities of 10% compared to the year 1998. In 1999 electric power from renewable energy sources such as wind, biomass, and waste covers close to 10% of the total Danish power consumption. More than 400 new turbines are installed in 1999 and the total capacity of wind power increases with ca. 20%. The actual energy content of the wind in 1999 was, however, 15% lower than normally which results in a significant reduction of the utilisation of the wind turbine capacity. (ln)

  14. Fault analysis and strategy of high pulsed power supply for high power laser

    International Nuclear Information System (INIS)

    Liu Kefu; Qin Shihong; Li Jin; Pan Yuan; Yao Zonggan; Zheng Wanguo; Guo Liangfu; Zhou Peizhang; Li Yizheng; Chen Dehuai

    2001-01-01

    according to the requirements of driving flash-lamp, a high pulsed power supply (PPS) based on capacitors as energy storage elements is designed. The author analyzes in detail the faults of high pulsed power supply for high power laser. Such as capacitor internal short-circuit, main bus breakdown to ground, flashlamp sudden short or break. The fault current and voltage waveforms were given by circuit simulations. Based on the analysis and computation, the protection strategy with the fast fuse and ZnO was put forward, which can reduce the damage of PPS to the lower extent and provide the personnel safe and collateral property from the all threats. The preliminary experiments demonstrated that the design of the PPS can satisfy the project requirements

  15. Power supply for control and instrumentation in Fast Breeder Test Reactor

    International Nuclear Information System (INIS)

    Raghavan, K.; Shanmugam, T.K.

    1977-01-01

    The design and operation of the four 'no-break' power supplies for control and instrumentation in the Fast Breeder Test Reactor (FBTR), Kalpakkam, are described. Interruptions in the power supplies are eliminated by redundancy and battery back-up source while voltage dips and transients are taken care by automatic regulation system. The four power supplies are : (1) 24 V D.C. exclusively for neutronic and safety circuits, (2) 48 V D.C. for control logic indication lamps and solenoid valves, (3) 220 V D.C. for switchgear control, control room emergency lighting and D.C. flushing oil pump for the turbine and (4) 220 V A.C. single-phase 50 H/Z for computers and electronics of control and instrumentation. Stationary lead-acid batteries (lead antimony type) in floating mode operation with rectifier/charger are used for emergency back-up. All these power supplies are fed by 415 V, 3-phase, 50 HZ emergency supply buses which are provided with diesel generator back-up. Static energy conversion system (in preference to mechanical rotation system) is used for A.C. to D.C. and also for A.C. to A.C. conversion. (M.G.B.)

  16. Supply disruption cost for power network planning

    International Nuclear Information System (INIS)

    Kjoelle, G.H.

    1992-09-01

    A description is given of the method of approach to calculate the total annual socio-economic cost of power supply disruption and non-supplied energy, included the utilities' cost for planning. The total socio-economic supply disruption cost is the sum of the customers' disruption cost and the utilities' cost for failure and disruption. The mean weighted disruption cost for Norway for one hour disruption is NOK 19 per kWh. The customers' annual disruption cost is calculated with basis in the specific disruption cost referred to heavy load (January) and dimensioning maximum loads. The loads are reduced by factors taking into account the time variations of the failure frequency, duration, the loads and the disruption cost. 6 refs

  17. Electricity decision-making: New techniques for calculating statewide economic impacts from new power supply and demand-side management programs

    Science.gov (United States)

    Tegen, Suzanne Isabel Helmholz

    This dissertation introduces new techniques for calculating and comparing statewide economic impacts from new coal, natural gas and wind power plants, as well as from demand-side management programs. The impetus for this work was two-fold. First, reviews of current literature and projects revealed that there was no standard way to estimate statewide economic impacts from new supply- and demand-side electricity options. Second, decision-makers who were interviewed stated that they were overwhelmed with data in general, but also lacked enough specific information about economic development impacts to their states from electricity, to make informed choices. This dissertation includes chapters on electricity decision-making and on economic impacts from supply and demand. The supply chapter compares different electricity options in three states which vary in natural resource content: Arizona, Colorado and Michigan. To account for differing capacity factors, resources are compared on a per-megawatt-hour basis. The calculations of economic impacts from new supply include: materials and labor for construction, operations, maintenance, fuel extraction, fuel transport, as well as property tax, financing and landowner revenues. The demand-side chapter compares residential, commercial and industrial programs in Iowa. Impact calculations include: incremental labor and materials for program planning, installation and operations, as well as sales taxes and electricity saved. Results from supply-side calculations in the three states analyzed indicate that adding new wind power can have a greater impact to a state's economy than adding new gas or coal power due to resource location, taxes and infrastructure. Additionally, demand-side management programs have a higher relative percentage of in-state dollar flow than supply-side solutions, though demand-side programs typically involve fewer MWh and dollars than supply-side generation. Methods for this dissertation include researching

  18. Application of parallel connected power-MOSFET elements to high current d.c. power supply

    International Nuclear Information System (INIS)

    Matsukawa, Tatsuya; Shioyama, Masanori; Shimada, Katsuhiro; Takaku, Taku; Neumeyer, Charles; Tsuji-Iio, Shunji; Shimada, Ryuichi

    2001-01-01

    The low aspect ratio spherical torus (ST), which has single turn toroidal field coil, requires the extremely high d.c. current like as 20 MA to energize the coil. Considering the ratings of such extremely high current and low voltage, power-MOSFET element is employed as the switching device for the a.c./d.c. converter of power supply. One of the advantages of power-MOSFET element is low on-state resistance, which is to meet the high current and low voltage operation. Recently, the capacity of power-MOSFET element has been increased and its on-state resistance has been decreased, so that the possibility of construction of high current and low voltage a.c./d.c. converter with parallel connected power-MOSFET elements has been growing. With the aim of developing the high current d.c. power supply using power-MOSFET, the basic characteristics of parallel operation with power-MOSFET elements are experimentally investigated. And, the synchronous rectifier type and the bi-directional self commutated type a.c./d.c. converters using parallel connected power-MOSFET elements are proposed

  19. The control system based on PXI technology for high voltage power supply

    International Nuclear Information System (INIS)

    Chen Dehong; Zhang Ming; Ma Shaoxiang; Xia Linglong; Zeng Zhen; Zhang Xueliang; Wang Chuliang; Yu Kexun

    2014-01-01

    A 100 kV/60 A high voltage power supply (HVPS) is being developed to carry some auxiliary heating research on J-TEXT and supply the auxiliary heating system. The power supply which consists of 144 switch modules is based on PSM technology. For the requirement of isolation, control and protection, a control system based on the PCI extensions for instrumentation (PXI) which meets up with the CODAC standards is designed with developed PSM technology for the high voltage power supply. The compact structure of hardware in the control system is presented too. And the control strategy which is based on shift phase pulse width modulation is discussed Some tests are performed on the control system to validate the control strategy, the experimental results show that the system has a good control performance and fast response, which meets the control requirement of 100 kV/60 A high voltage power supply. (authors)

  20. High efficiency class-I audio power amplifier using a single adaptive supply

    International Nuclear Information System (INIS)

    Peng Zhenfei; Yang Shanshand; Feng Yong; Hong Zhiliang; Liu Yang

    2012-01-01

    A high efficiency class-I linear audio power amplifier (PA) with an adaptive supply is presented. Its efficiency is improved by a dynamic supply to reduce the power transistors' voltage drop. A gain compression technique is adopted to make the amplifier accommodate a single positive supply. Circuit complicity and chip area are reduced because no charge pump is necessary for the negative supply. A common shared mode voltage and a symmetric layout pattern are used to minimize the non-linearity. A peak efficiency of 80% is reached at peak output power. The measured THD+N before and after the supply switching point are 0.01% and 0.05%, respectively. The maximum output power is 410 mW for an 8 Ω speaker load. Unlike switching amplifiers, the class-I amplifier operates as a linear amplifier and hence has a low EMI. The advantage of a high efficiency and low EMI makes the class-I amplifier suitable for portable and RF sensitive applications. (semiconductor integrated circuits)

  1. Magnet power supply system for the ISABELLE half-cell prototype

    International Nuclear Information System (INIS)

    Nawrocky, R.J.

    1977-01-01

    Due to stringent requirements on the spatial harmonic content of ISABELLE's magnetic field, the magnet power supplies for the half-cell prototype must be dynamically accurate and stable to within 0.01% of their full-scale rating. Depending on the application, the full-scale current of various units comprising the system ranges from +-50 A to 4000 A. The system, as constructed is fully controllable and programmable either manually or with a control computer. The magnet power supply system described was constructed and interconnected with the half-cell computer control equipment. A number of power supply units were tested with inductive test loads in both the manual and the computer control modes. Test results on stability and speed of response indicate that all systems perform according to specifications

  2. Performance calculations for battery power supplies as laboratory research tools

    International Nuclear Information System (INIS)

    Scanlon, J.J.; Rolader, G.E.; Jamison, K.A.; Petresky, H.

    1991-01-01

    Electromagnetic Launcher (EML) research at the Air Force Armament Laboratory, Hypervelocity Launcher Branch (AFATL/SAH), Eglin AFB, has focused on developing the technologies required for repetitively launching several kilogram payloads to high velocities. Previous AFATL/SAH experiments have been limited by the available power supply resulting in small muzzle energies on the order of 100's of kJ. In an effort to advance the development of EML's, AFATL/SAH has designed and constructed a battery power supply (BPS) capable of providing several mega-Amperes of current for several seconds. This system consists of six modules each containing 2288 automotive batteries which may be connected in two different series - parallel arrangements. In this paper the authors define the electrical characteristics of the AFATL Battery Power supply at the component level

  3. Impacts of Power Structure on Sustainable Supply Chain Management

    OpenAIRE

    Zhi Li; Yangyang Xu; Fumin Deng; Xuedong Liang

    2017-01-01

    The present paper examines the manufacturer’s operational decisions, e.g., wholesale price and product sustainability level, the retailer’s operational decision, e.g., retail margin, and supply chain efficiency under three supply chain power structures: manufacturer Stackelberg, Nash and retailer Stackelberg. As a benchmark, we first obtain the equlibrium price and product sustainability level in a vertically integrated supply chain. Our analysis provides some interesting findings in a decent...

  4. Prognostic Health Management for Avionics System Power Supplies

    National Research Council Canada - National Science Library

    Orsagh, Rolf; Brown, Douglas; Roemer, Michael; Dabney, Thomas; Hess, Andrew

    2005-01-01

    This paper presents an integrated approach to switching mode power supply health management that implements techniques from engineering disciplines including statistical reliability modeling, damage...

  5. Electric generation situation through hybrid systems in Para state and perspectives in face of the global supply of electric power; Situacao da geracao eletrica atraves de sistemas hibridos no estado do Para e perspectivas frente a universalizacao da energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Barbosa, Claudomiro Fabio de Oliveira; Pinho, Joao Tavares; Pereira, Edinaldo Jose da Silva; Galhardo, Marcos Andre Barros; Vale, Silvio Bispo do; Maranhao, Wilson Monteiro de Albuquerque [Universidade Federal do Para (UFPA), Belem, PA (Brazil). Grupo de Estudos e Desenvolvimento de Alternativas Energeticas], e-mail: gedae@ufpa.br

    2004-07-01

    This work presents an analysis of the hybrid systems for electricity generation installed in the State of Para, emphasizing the profile of the supplied localities, the conversion technologies in the several configurations used for electric power generation, the social, economic and environmental impacts caused by such systems, the management and sustainability of the systems, and their perspectives in face of the global supply of electric power in Brazil. (author)

  6. On site power generation protects water supply for Ajax, Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Morsy, Mohamed

    2011-01-15

    The Ajax water supply plant treats and distribute water for the town of Ajax and the nearby City of Pickering and the operations staff manages two other treatment plants supplying the City of Oshawa and the Town of Whitby, and a dozen pumping stations, reservoirs and elevated tanks. The plant requires around 2 MW of continuous power to supply its 150,000 customers. Although local utility power is reliable, standby generators are mandated by the Ontario Ministry of the Environment. When power goes out problems can result in the plant and system. To avoid these, the Ajax plant staff selected Cummins Power Generation who delivered one 350 kW and two 1500 kW generator sets with automatic transfer switches and paralleling switchgear. These digital systems parallel and synchronize the generator sets with each other and with the utility, which allows the plant to provide continuous service. The plant is designed for twice its current capacity and is ready to handle future requirements.

  7. Requirements Specication for Ampliers and Power Supplies in Active Loudspeakers

    DEFF Research Database (Denmark)

    Schneider, Henrik; Jensen, Lasse Crone; Petersen, Lars Press

    2014-01-01

    This work aims to provide designers with a method to develop a requirements specication for power supplies and ampliers in active loudspeakers. The motivation is to avoid over-sizing and unnecessary cost. A realistic estimation of the power supplied during playback of audio in a given loudspeaker...... is obtained by considering a wide range of audio source material, loudness normalization of the source material, crossover ltering, driver characteristics as well as a perceived maximum loudness/volume level. The results from analysing a sub-woofer and a woofer reveals the peak power, peak voltage, peak...... current and apparent power - thus providing a solid foundation for a requirement specication....

  8. An Enhanced Control Scheme for Uninterruptible Power Supply

    DEFF Research Database (Denmark)

    Lu, Jinghang; Savaghebi, Mehdi; Wei, Baoze

    2017-01-01

    To address the active power feeding issue in the parallel Uninterruptible Power Supply (UPS) system, a DC-link Voltage Protection (DCVP) control strategy is proposed in this paper. The proposed control method only relies on local load information, which increases the system reliability...... and robustness. Moreover, virtual resistance based regulation strategies are proposed for solving the active power sharing imbalance caused by the active power feeding and harmonic power sharing imbalanced caused by the line resistance mismatching. In addition, an anti-windup based consensus distributed...

  9. Investigation of occurrences of loss of external power supply in Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Conde, J.M.; Reig, J.

    1989-01-01

    The paper reports on an investigation undertaken by the Nuclear Safety Council into occurrences of loss of external power supply in Spanish light water plants between 1981 and 1987. During this period all of the plants investigated (nine), with the exception of one, experienced an event of this type. The causes, effects and duration of each are studied in detail and the conclusion is drawn that the main cause of this type of occurrence is the intrinsic instability of the Spanish national grid. The response of plants to these various failures in external power supply was studied, special attention being paid to the correct operation of safety systems. In addition, the behaviour of other systems not related to safety is discussed, as are modifications and actions taken as a result of accumulated experience with a view to improving the plant response in the event of the failure of the external power supply, and reducing the frequency of such occurrences and their effective duration. The data obtained from this analysis were compared with those obtained in studies performed in other countries and the conclusion was drawn that failures in the external power supply occur slightly more frequently in Spain than in other countries. Similarly, a comparison was drawn between plant response during an actual failure and the response obtained during loss of external power nuclear tests which are carried out in all Spanish plants during the startup (commissioning) programme, in order to ascertain whether the test itself is adequate. (author). 1 fig., 3 tabs

  10. Building a new control system for the cyclotron power supplies

    International Nuclear Information System (INIS)

    Kormany, Z.; Lakatos, T.; Kovacs, P.; Szuecs, I.; Ander, I.

    2000-01-01

    Complete text of publication follows. The MGC cyclotron of the ATOMKI is a multi-particle and variable-energy machine with a rather complicated beam transport system. As a consequence, the current or voltage value of numerous power supplies should be set and adjusted by the operators during a typical run. The original control system of the cyclotron provides a traditional control desk for this purpose where the requested values can be set by using selector switches and up/down tumblers. The adjustment process with this system is completely manual and rather slow - every power supply unit gets its starting value one after the other and it typically takes 10 to 20 minutes to change the whole setting. Another disadvantage of the present system is the poor reproducibility / the analogue panel meters of the control desk cannot provide the required precision to exactly repeat a former setting. To overcome the above difficulties and speed up the adjustment process of the cyclotron and the beam transport lines, a new control system for the power supplies has been designed and is under implementation within the framework of our modernization project. Supported by the International Atomic Energy Agency, Technical Assistance Program - Project Code Number: HUN/4/013. The control of the power supplies will be changed to digital - the analogue control signals of the power stages will be produced by the D/A, the current and voltage values will be read by the A/D conversion modules of a programmable logic controller (PLC). The transition to digital control requires the development of special interface units. To separate completely the control and measuring channels from each other, they are isolated from the PLC-ground by applying opto-isolators. A two-channel (control and measurement) linear interface circuit built around the TIL 300 optical isolators has been designed, assembled and tested. It has been verified that the linearity and the precision of this circuit fulfills the

  11. Drinking-water supply system of Arbedo-Castione. Replacement of the main water supply line and installation of a small hydropower plant; Sostituzione condotta adduzione sorgenti in valle d'Arbedo e ricupero energetico. Acquedotto di Arbedo-Castione

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2005-07-01

    This report presents the comparative evaluation of variants for the replacement work of the main drinking-water supply line from the Arbedo valley to the community of Arbedo-Castione, southern Switzerland. Three variants include the installation of a small hydropower plant to take advantage of the elevation difference of 340 m between the location of water collection and the water reservoir. The base case only includes the line replacement. The feasibility study includes both a technical and an economical analysis. The average water flow rate is estimated to 12 l/s. The nominal electrical power would be 25 kW. Power production cost is calculated to about 0.09 Swiss francs/kWh. The author concludes that an optimized variant with small hydropower plant would be the best solution, also from the point of view of environmental aspects.

  12. A modular approach for RFX D.C. power supplies

    International Nuclear Information System (INIS)

    Bolognani, S.; Ciscato, D.; Tenti, P.

    1981-01-01

    A modular approach to the realization of D.C. Power Supplies of the Reverse Field Pinch Experiment (RFX) is presented. A basic convertor module configuration is proposed which enables a high flexibility of the power supply system to be obtained, as required to cope with the plasma behaviour uncertainties. The basic convertor module rating has been selected to meet all the expected load requirements and a preliminary design of the convertor has been carried out for evaluating the technical and economical feasibility of the system. Different fault conditions have been analyzed and protective devices have been devised accordingly. Finally simulated profiles of the active and reactive power drawn from the AC mains are reported. (author)

  13. Power supply for plasma generator of HL-1M neutral beam injector

    International Nuclear Information System (INIS)

    Wang Detai; Qian Jiamei; Lei Guangjiu; Shun Mengda; Jiang Shaofeng; Wang Enyao; Lu Xuejun; Yang Tiehai; Wang Xuehua; Zhao Zhimin; Hao Ming; Huang Jianrong; Yu Yanqiu; Cheng Baoqiang; Wu Zhige; Sheng Ning; Hu Qingtao

    1999-01-01

    The diagram of the HL-1M Neutral Beam Injector (NBI) and the power supply (PS) system is shown. The NBI consists of ion source, beam line and power supply system etc. The ion source includes plasma generator and three-electrode extraction system. The power supply for plasma generator consists of a filament PS, an arc PS and gas valve PS. Testing has shown that the PS for plasma generator of the HL-1M NBI has excellent stability and obtain good plasma heating effect

  14. Proposal for the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel. Following a market survey carried out among 92 firms in fifteen Member States, a call for tenders (IT-2682/ST/LHC) was sent on 7 September 2001 to seven firms, seven consortia consisting of two firms and three consortia consisting of four firms, in twelve Member States. By the closing date, CERN had received 11 tenders from five firms and six consortia in ten Member States. The Finance Committee is invited to agree to the negotiation of a contract with RENCO (IT), the lowest compliant bidder, for the supply and installation of pipelines for the LHC accelerator tunnel for a total amount of 21 995 304 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 100%.

  15. Control system of power supply for resistance welding machine

    Directory of Open Access Journals (Sweden)

    Світлана Костянтинівна Поднебенна

    2017-06-01

    Full Text Available This article describes the existing methods of heat energy stabilizing, which are realized in thyristor power supplies for resistance welding machines. The advantages and features of thyristor power supplies have been described. A control system of power supply for resistance welding machine with stabilization of heat energy in a welding spot has been developed. Measurements are performed in primary winding of a welding transformer. Weld spot heating energy is calculated as the difference between the energy, consumed from the mains, and the energy losses in the primary and secondary circuits of the welding transformer as well as the energy losses in the transformer core. Algorithms of digital signal processing of the developed control system are described in the article. All measurements and calculations are preformed automatically in real-time. Input signals to the control system are: transformer primary voltage and current, temperature of the welding circuit. The designed control system ensures control of the welding heat energy and is not influenced by the supply voltage and impedance changes caused by insertion of the ferromagnetic mass in the welding circuit, the temperature change during the welding process. The developed control system for resistance welding machine makes it possible to improve the quality of welded joints, increase the efficiency of the resistance welding machine

  16. Energy supply waste water treatment plant West Brabant

    Energy Technology Data Exchange (ETDEWEB)

    Poldervaart, A; Schouten, G J

    1983-09-01

    For the energy supply for the waste water treatment plant (rwzi-Bath) of the Hoogheemraadschap West-Brabant three energy sources are used: biogas of the digesters, natural gas and electricity delivered by the PZEM. For a good balance between heat/power demand and production a heat/power plant is installed. By using this system a high efficiency for the use of energy will be obtained. To save energy the oxygen concentration in the aerationtanks is automatically controlled by means of regulating the position of the air supply control valves and the capacity and number of the turbocompressors. For the oxygen controlsystem a Siemens PLC is used.

  17. Ultra-long-pulse microwave negative high voltage power supply with fast protection

    International Nuclear Information System (INIS)

    Xu Weihua; Wu Junshuan; Zheng Guanghua; Huang Qiaolin; Yang Chunsheng; Zhou Yuanwei; Chen Yonghao

    1998-01-01

    Two 1.4 MW high voltage power supply (HVPS) modules with 3-5 s pulse duration have been developed for LHCD experiment in the HT-7 tokamak. The power source consists of a pulsed generator and the electric circuit. Duration of the ultra-long-pulse is controlled by switching-on dc relay immediately and switching-off ac contactor after a given time, and the fast protection is executed by a crowbar. Due to the soft starting of the power source, the problem of overvoltage induced by dc relay switching-on has been solved. Each power supply module outputs a rated power (-35 kV, 40 A) on the dummy load. With the klystrons connected as the load of the power supply modules, LHCD experiments have been conducted successfully in the HT-7 tokamak

  18. High performance magnet power supply optimization

    International Nuclear Information System (INIS)

    Jackson, L.T.

    1988-01-01

    The power supply system for the joint LBL--SLAC proposed accelerator PEP provides the opportunity to take a fresh look at the current techniques employed for controlling large amounts of dc power and the possibility of using a new one. A basic requirement of +- 100 ppM regulation is placed on the guide field of the bending magnets and quadrupoles placed around the 2200 meter circumference of the accelerator. The optimization questions to be answered by this paper are threefold: Can a firing circuit be designed to reduce the combined effects of the harmonics and line voltage combined effects of the harmonics and line voltage unbalance to less than 100 ppM in the magnet field. Given the ambiguity of the previous statement, is the addition of a transistor bank to a nominal SCR controlled system the way to go or should one opt for an SCR chopper system running at 1 KHz where multiple supplies are fed from one large dc bus and the cost--performance evaluation of the three possible systems

  19. 180 MW/180 KW pulse modulator for S-band klystron of LUE-200 linac of IREN installation of JINR

    Science.gov (United States)

    Su, Kim Dong; Sumbaev, A. P.; Shvetsov, V. N.

    2014-09-01

    The offer on working out of the pulse modulator with 180 MW pulse power and 180 kW average power for pulse S-band klystrons of LUE-200 linac of IREN installation at the Laboratory of neutron physics (FLNP) at JINR is formulated. Main requirements, key parameters and element base of the modulator are presented. The variant of the basic scheme on the basis of 14 (or 11) stage 2 parallel PFN with the thyratron switchboard (TGI2-10K/50) and six parallel high voltage power supplies (CCPS Power Supply) is considered.

  20. Design of a Percussion and Electric Primer Gun Firing Power Supply

    Science.gov (United States)

    2014-07-01

    solenoid failure. As new instrumentation techniques such as high-speed video and laser interferometry have been introduced into our gun testing...to drive a solenoid into a percussion primer or ignite the M52A3B1 electric primer. To reduce power requirements, it uses charged capacitor banks to...drive the solenoid or ignite the primer. This report details the design and construction of the power supplies. 15. SUBJECT TERMS power supply

  1. Study of pulse stretching in high current power supplies using multipulse techniques

    International Nuclear Information System (INIS)

    Trendler, R.C.

    1977-01-01

    Considerable interest exists at Fermilab to increase the pulse width of the Neutrino Focusing Horn to permit an increase in beam spill length from twenty (20) microseconds to one (1) millisecond. Two techniques to do this were examined: (1) a high current transformer, and (2) increased bank capacitance using the multi-power supply technique. The transformer is the most straightforward conceptually; it is, however, a complicated device requiring sizable changes to the existing horn power supply. This alternative is briefly reviewed. The second scheme involves pulsing a 20 kv 200 ka power supply to establish the required load current and then maintaining this current by the sequential pulsing of a number of low voltage high current power supplies. This alternative is discussed in detail with the results of tests performed on the Fermilab Focusing Horn System

  2. Energy saver A-sector power test results

    International Nuclear Information System (INIS)

    Martin, P.; Flora, R.; Tool, G.; Wolff, D.

    1982-01-01

    The superconducting magnets and associated cryogenic components in A-sector represent the initial phase of installation of the Fermilab superconducting accelerator, designed to accelerate proton beams to energies of 1 TeV. Installation of the magnets, comprising one-eighth of the ring, was completed in December, 1981. Cooldown and power tests took place in the first half of 1982, concurrent with main ring use for 400 GeV high energy physics. The tests described in this paper involved 151 cryogenic components in the tunnel: 94 dipoles, 24 quadrupoles, 25 spool pieces, 3 feed cans, 4 turn-around boxes and 1 bypass. Refrigeration was supplied by three satellite refrigerators, the Central Helium Liquefier, and two compressor buildings. The magnets were powered by a single power supply

  3. Effectiveness and regulation in the Norwegian power supply

    International Nuclear Information System (INIS)

    Kittelsen, S.A.C.

    1994-03-01

    The report deals with the Norwegian research project dubbed ''Effectiveness in the power supply''. The aim of the project was to develop a methodology and a suitable tool (EDB-PC) to assess the cost effectiveness in the electric power distribution network in order to stipulate the average prices of power distribution in the different network levels. Topics cover as follow: Demand of regulation; measuring method and data; measured effectiveness; regulation of the Norwegian power distribution. 52 refs., 15 figs., 6 tabs

  4. Local management of rural power supply. A new approach in Tanzania

    Energy Technology Data Exchange (ETDEWEB)

    Gullberg, Monica; Katyega, Maneno; Kjellstroem, Bjoern

    1999-07-01

    The rural electrification program in Tanzania has been on going since independence in 1961, with the national utility, Tanzania Electric Supply Company Ltd. (TANESCO) being responsible for its implementation. By 1992, 14 townships and 37 villages had been electrified as a result of this program. This covers only a small fraction of rural Tanzania. It is estimated that in 1998, less than 1% of the rural households in Tanzania had access to electricity. Electricity constitutes only 1% of Tanzania's final energy consumption. Except for the few latest years, electricity generation and distribution in Tanzania has been the full responsibility of TANESCO. The national electricity grid is mainly supplied by large-scale hydro power plants (391 MW), and thermal power plants (148 MW). Rural areas are supplied either by a transmission line from the national grid or by diesel generator sets. The isolated branches run by TANESCO have an installed capacity amounting to a total of 23 MW. Electric lighting is the dominating use of electricity in rural areas. Industrial use in these areas is marginal. Very few rural households use electricity for cooking. Cooking is made with fuelwood and to some extent charcoal and kerosene. Where electricity is not available, kerosene in simple wick lamps is used for lighting. As part of the research co-operation between TANESCO and the Stockholm Environment Institute, SEI, an extensive evaluation of the experiences from the rural electrification program in Tanzania was carried out in 1989 - 1991. The four main conclusions from this evaluation were in summary: The rural people appreciate electrification. Rural electrification is a large financial burden on TANESCO. The quality of the service, in particular the supply reliability, is low in rural areas. Many of the perceived benefits of rural electrification, like the creation of small scale industries or reduced use of fuel wood for cooking, have not materialised to a significant degree. As

  5. Advanced superconducting power cable for MV urban power supply

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Frank [Nexans Deutschland GmbH, Hannover (Germany); Merschel, Frank [RWE Deutschland AG, Essen (Germany); Noe, Mathias [Karlsruhe Institute of Technology, Karlsruhe (Germany)

    2015-07-01

    In recent years the technology of superconducting power cable systems has progressed such that the technical hurdles preparing for commercial applications have been mastered. Several field tests of large scale prototypes for the applications of superconducting cables as well as superconducting fault current limiters have been successfully accomplished and the technology of such systems is ready for commercialization. The presentation will give a detailed overview of the German AmpaCity project. An overview will be given on the development, manufacturing and installation of the 10 kV, 40 MVA HTS system consisting of a fault current limiter and of a 1 km cable in the city of Essen. Since it is the first time that a one kilometer HTS cable system is installed together with an HTS fault current limiter in a real grid application between two substations within a city center area, AmpaCity serves as a lighthouse project. In addition it is worldwide the longest installed HTS cable system so far. It is expected that relatively large technical advances will be made in the future of the comparatively new HTS technology, which in turn will bring associated cost reductions. For this reason, the AmpaCity pilot project in the downtown area of Essen in Germany will be an important step on the way to achieving more widespread application of HTS technology.

  6. Statement on incidents at nuclear installations - second quarter 1987

    International Nuclear Information System (INIS)

    1988-01-01

    The first incident reported occurred at the Sellafield reprocessing plant when a process worker was contaminated on the right knee of his overalls and received a skin dose in excess of the annual dose limit. Following an inquiry, he was allowed to return to normal working within 3 months. The second incident occurred at the Oldbury nuclear power station when reaction-1 tripped following the failure of one of the three phases of the electricity supply to part of the instrumentation. This caused a loss of forced coolant circulating for a short time following the reactor shutdown. However, following safety checks it was allowed to return to power. Improvements in the instrument supply system protection were subsequently installed on reactor-2 and will be, when possible, on reactor-1. (UK)

  7. Effective policies for renewable energy - the example of China's wind power - lessons for China's photovoltaic power

    International Nuclear Information System (INIS)

    Wang, Qiang

    2010-01-01

    China, one of the global biggest emitter of CO 2 , needs promotion renewable energy to reduce air pollution from its surging fossil fuel use, and to increase its energy supply security. Renewable energy in its infancy needs policy support and market cultivation. Wind power installed capacity has boomed in recent year in China, as a series of effective support policies were adopted. In this paper, I review the main renewable energy policies regarding to China's wind power, including the Wind Power Concession Program, Renewable Energy Law, and a couple of additional laws and regulations. Such policies have effectively reduced the cost of wind power installed capacity, stimulated the localization of wind power manufacture, and driven the company investment in wind power. China is success in wind power installed capacity, however, success in wind-generated electricity has yet achieved, mainly due to the backward grid system and lack of quota system. The paper ends with the recommended best practice of the China's wind power installed capacity might be transferable to China's photovoltaic power generation. (author)

  8. An acclerator-based installation of small power with the lead-bismuth coolant

    Energy Technology Data Exchange (ETDEWEB)

    Gorshkov, V.T.; Yefimov, E.I.; Novikova, N.N. [Research and Development Bereau, Podolsk (Russian Federation)] [and others

    1995-10-01

    The structure of the accelerator-based installation is described that includes the subcritical reactor-blanket with power 15 MW(h) cooled with lead-bismuth, the lead-bismuth flow target where a beam of {alpha}-particle is injected, the equipment of a primary and secondary curcuits. Some results of calculations and estimations are discussed that have been carried out to justify the target and blanket constructions. Some main characteristics of the installation are presented.

  9. Designing a power supply for Nim-bin formatted equipment

    International Nuclear Information System (INIS)

    Banuelos G, L. E.; Hernandez D, V. M.; Vega C, H. R.

    2016-09-01

    From an old Nuclear Chicago power supply that was practically in the trash, was able to recover the 19 inches casing, rear connectors and the housing where the circuits were. From here all mechanical parts were cleaned and the electronic design was started to replace the original voltage and current functions of this equipment. The cards for the ±6, ±12 and ±24 voltages were designed, simulated and tested with circuitry that does not rely on specialized components or that is sold only by the equipment manufacturer. In the handling of the current by each voltage to operate, was possible to tie with the specifications of the manufacturers like Ortec or Canberra where a model of power supply gives a power of 160 Watts. Basic tests were performed to show that the behavior is very similar to commercial equipment; such as the full load regulation index and the noise level in the supply voltages. So our Nim-bin voltage source is viable for use in our institution laboratories. (Author)

  10. Programmable Power Supply for AC Switching Magnet of Proton Accelerator

    CERN Document Server

    Jeong, Seong-Hun; Kang Heung Sik; Lee, Chi-Hwan; Lee, Hong-Gi; Park, Ki-Hyeon; Ryu, Chun-Kil; Sik Han, Hong; Suck Suh, Hyung

    2005-01-01

    The 100-MeV PEFP proton linac has two proton beam extraction lines for user' experiment. Each extraction line has 5 beamlines and has 5 Hz operating frequency. An AC switching magnet is used to distribute the proton beam to the 5 beamlines, An AC switching magnet is powered by PWM-controlled bipolar switching-mode converters. This converter is designed to operate at ±350A, 5 Hz programmable step output. The power supply is employed IGBT module and has controlled by a DSP (Digital Signal Process). This paper describes the design and test results of the power supply.

  11. Application of electric double layer capacitor to pulse coil power supply

    International Nuclear Information System (INIS)

    Abe, Keita; Inomoto, Michiaki; Yamada, Takuma; Kamio, Shuji; Sakumura, Morio; Cao, Qinghong; Ono, Yasushi; Kuwahata, Akihiro; Imazawa, Ryota

    2011-01-01

    We developed a new application of the electric double layer capacitor (EDLC) as a sec-order quasi-DC power supply like flying-wheel motor-generators. We constructed the power supply using IGBT switching circuit and successfully demonstrated its initial operation whose current and duration time are 100 A and 3 sec, respectively, indicating a new potential of EDLC. (author)

  12. Development of laser material processing and laser metrology techniques. Development of the power supply of high power CO{sub 2} laser for material processing

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Heon Ju; Lee, Yong Hak; Jang, Do Hyun; Kim, Su Hun [Cheju National University, Cheju (Korea, Republic of)

    1994-08-01

    The 2 Kw solid state RF power supply has been designed and fabricated The power supply was composed of oscillator, driver amplifier and power amplifier. Each part of the power supply was developed and tested. The impedance matching circuit to apply this RF power supply for laser discharge excitation was fabricated also. The RF discharge experiment for the excitation of CO{sub 2} laser was performed. The radiofrequency power supply which has the output power of 2 Kw has been developed. The subsystems of the power supply have been fabricated and their performances were reliable. The RF discharge experiment to generate the laser plasma has been performed and input power density of 6 W/cm{sub 3} has been achieved. (author). 5 refs., 28 figs., 8 tabs.

  13. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.A.; MI, J.; OERTER, B.; SANDERS, R.; SANDBERG, J.

    2001-01-01

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful

  14. Evolution of Very High Frequency Power Supplies

    DEFF Research Database (Denmark)

    Knott, Arnold; Andersen, Toke Meyer; Kamby, Peter

    2013-01-01

    The ongoing demand for smaller and lighter power supplies is driving the motivation to increase the switching frequencies of power converters. Drastic increases however come along with new challenges, namely the increase of switching losses in all components. The application of power circuits used...... in radio frequency transmission equipment helps to overcome those. However those circuits were not designed to meet the same requirements as power converters. This paper summarizes the contributions in recent years in application of very high frequency (VHF) technologies in power electronics, shows results...... of the recent advances and describes the remaining challenges. The presented results include a self-oscillating gate-drive, air core inductor optimizations, an offline LED driver with a power density of 8.9 W/cm3 and a 120 MHz, 9 W DC powered LED driver with 89 % efficiency as well as a bidirectional VHF...

  15. HTS Transmission Cable System for installation in the Long Island Power Grid

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Frank [American Superconductor Corporation, Devens, MA (United States); Durand, Fabien [American Superconductor Corporation, Devens, MA (United States); Maguire, James [American Superconductor Corporation, Devens, MA (United States)

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2 and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.

  16. Redundancy proves its worth in FR Germany [emergency power supplies

    International Nuclear Information System (INIS)

    Simon, M.

    1987-01-01

    An analysis of loss of power events at nuclear power stations in FR Germany has confirmed the data used in the German risk study and underlined the advantages of providing a high degree of redundancy in emergency power supplies. (author)

  17. The computer simulation of the resonant network for the B-factory model power supply

    International Nuclear Information System (INIS)

    Zhou, W.; Endo, K.

    1993-07-01

    A high repetition model power supply and the resonant magnet network are simulated with the computer in order to check and improve the design of the power supply for the B-factory booster. We put our key point on a transient behavior of the power supply and the resonant magnet network. The results of the simulation are given. (author)

  18. Design of 1 MHz solid state high frequency power supply

    International Nuclear Information System (INIS)

    Parmar, Darshan Kumar; Singh, N.P.; Gajjar, Sandip

    2015-01-01

    A High Voltage High Frequency (HVHF) Power supply is used for various applications, like AM Transmitters, metallurgical applications, Wireless Power Transfer, RF Ion Sources, etc. The Ion Source for a Neutral beam Injector at ITER-India uses inductively coupled power source at High Frequency (∼ 1 MHz). Switching converter based topology used to generate 1 MHz sinusoidal output is expected to have advantages on efficiency and reliability as compared to traditional RF Tetrode tubes based oscillators. In terms of Power Electronics, thermal and power coupling issues are major challenges at such a high frequency. A conceptual design for a 200 kW, 1 MHz power supply and a prototype design for a 600W source been done. The prototype design is attempted with Class-E amplifier topology where a MOSFET is switched resonantly. The prototype uses two low power modules and a ferrite combiner to add the voltage and power at the output. Subsequently solution with class-D H-Bridge configuration have been evaluated through simulation where module design is stable as switching device do not participate in resonance, further switching device voltage rating is substantially reduced. The rating of the modules is essentially driven by the maximum power handling capacity of the MOSFETs and ferrites in the combiner circuit. The output passive network including resonance tuned network and impedance matching network caters for soft switching and matches the load impedance to 50 ohm respectively. This paper describes the conceptual design of a 200 kW power supply and experimental results of the prototype 600 W, 1 MHz source. (author)

  19. Design of 1 MHz Solid State High Frequency Power Supply

    Science.gov (United States)

    Parmar, Darshan; Singh, N. P.; Gajjar, Sandip; Thakar, Aruna; Patel, Amit; Raval, Bhavin; Dhola, Hitesh; Dave, Rasesh; Upadhay, Dishang; Gupta, Vikrant; Goswami, Niranjan; Mehta, Kush; Baruah, Ujjwal

    2017-04-01

    High Frequency Power supply (HFPS) is used for various applications like AM Transmitters, metallurgical applications, Wireless Power Transfer, RF Ion Sources etc. The Ion Source for a Neutral beam Injector at ITER-India uses inductively coupled power source at High Frequency (∼1 MHz). Switching converter based topology used to generate 1 MHz sinusoidal output is expected to have advantages on efficiency and reliability as compared to traditional RF Tetrode tubes based oscillators. In terms of Power Electronics, thermal and power coupling issues are major challenges at such a high frequency. A conceptual design for a 200 kW, 1 MHz power supply and a prototype design for a 600 W source been done. The prototype design is attempted with Class-E amplifier topology where a MOSFET is switched resonantly. The prototype uses two low power modules and a ferrite combiner to add the voltage and power at the output. Subsequently solution with Class-D H-Bridge configuration have been evaluated through simulation where module design is stable as switching device do not participate in resonance, further switching device voltage rating is substantially reduced. The rating of the modules is essentially driven by the maximum power handling capacity of the MOSFETs and ferrites in the combiner circuit. The output passive network including resonance tuned network and impedance matching network caters for soft switching and matches the load impedance to 50ohm respectively. This paper describes the conceptual design of a 200 kW high frequency power supply and experimental results of the prototype 600 W, 1 MHz source.

  20. EXPERIMENTAL INSTALLATION FOR AN ASSESSMENT OF METHODS OF WATER SUPPLY IN AN INTERNAL COMBUSTION ENGINE

    Directory of Open Access Journals (Sweden)

    A. V. Bizhaev

    2015-01-01

    Full Text Available The water additive to fuel became one of effective ways of the solution of the main problems of the piston internal combustion engines (ICE as it reduces thermal factor of the engine, toxic emissions of exhaust products, and also increases efficiency by some operating modes. The way of fuel and air mix with water feeding in the combustion chamber has a great influence on process of combustion. Experimental installation for obtaining comparative characteristics of the main methods of water supply in the ICE combustion chamber was created. It was defined that there are two ways of water supply in the combustion chamber. At the first way water feed is carried out in the form of a water fuel emulsion which moves to the combustion chamber through a nozzle by means of the fuel pump with a high pressure. At the second way water arrives with air through the spraying element - the carburetor or a nozzle. This way is very simple in difference of emulsion feeding. The easiest way is nozzles application. It was established that the emulsion as the non-uniform highly dispersed fluid can be divide into components. Therefore it is necessary to use during the feeding system operation special emulsifiers with air for the uniformity water getting to the cylinder. The system for each nozzle opening at some point was offered. System of feedback with sensors of exhaust gases temperature in a final collector for adjustment of duration of injection was worked out. It was showed that at the developed experimental stand it is possible to carry out tests at various power modes. As result it will be possible to estimate both ways of fuel and air mix with water feeding.