  1. Practical design considerations for photovoltaic power station

    Science.gov (United States)

    Swanson, T. D.

    Aspects of photovoltaic (PV) technology are discussed along with generic PV design considerations, taking into account the resource sunlight, PV modules and their reliability, questions of PV system design, the support structure subsystem, and a power conditioning unit subsystem. A description is presented of two recent projects which demonstrate the translation of an idea into actual working PV systems. A privately financed project in Denton, Maryland, went on line in early December, 1982, and began providing power to the local utility grid. It represents the first intermediate size, grid-connected, privately financed power station in the U.S. Based on firm quotes, the actual cost of this system is about $13/W peak. The other project, called the PV Breeder, is an energy independent facility which utilizes solar power to make new solar cells. It is also the first large industrial structure completely powered by the sun.

  2. Safety principles and design criteria for nuclear power stations

    International Nuclear Information System (INIS)

    Gazit, M.

    1982-01-01

    The criteria and safety principles for the design of nuclear power stations are presented from the viewpoint of a nuclear engineer. The design, construction and operation of nuclear power stations should be carried out according to these criteria and safety principles to ensure, to a reasonable degree, that the likelihood of release of radioactivity as a result of component failure or human error should be minimized. (author)

  3. Design of photovoltaic central power station concentrator array

    Energy Technology Data Exchange (ETDEWEB)

    1984-02-01

    A design for a photovoltaic central power station using tracking concentrators has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes an advanced Martin Marietta two-axis tracking fresnel lens concentrator. The concentrators are arrayed in 5 MW subfields, each with its own power conditioning unit. The photovoltaic plant output is connected to the existing 115 kV switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

  4. Solar Power Station Output Inverter Control Design

    Directory of Open Access Journals (Sweden)

    J. Bauer

    2011-04-01

    Full Text Available The photovoltaic applications spreads in these days fast, therefore they also undergo great development. Because the amount of the energy obtained from the panel depends on the surrounding conditions, as intensity of the sun exposure or the temperature of the solar array, the converter must be connected to the panel output. The Solar system equipped with inverter can supply small loads like notebooks, mobile chargers etc. in the places where the supplying network is not present. Or the system can be used as a generator and it shall deliver energy to the supply network. Each type of the application has different requirements on the converter and its control algorithm. But for all of them the one thing is common – the maximal efficiency. The paper focuses on design and simulation of the low power inverter that acts as output part of the whole converter. In the paper the design of the control algorithm of the inverter for both types of inverter application – for islanding mode and for operation on the supply grid – is discussed. Attention is also paid to the design of the output filter that should reduce negative side effects of the converter on the supply network.

  5. Station planning and design incorporating modern power system practice

    CERN Document Server

    Martin, PC

    1991-01-01

    The planning and design of new power stations can involve complex interaction between the many engineering disciplines involved as well as environmental, planning, economical, political and social pressures. This volume aims to provide a logical review of the procedures involved in power station development. The engineering aspects are outlined in detail, with examples, showing the basis of the relationships involved together with ""non-engineering"" factors so that the engineer can draw on the information provided for specific projects. The civil engineering and building of power stations are

  6. Design Provisions for Withstanding Station Blackout at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2015-08-01

    International operating experience has shown that the loss of off-site power supply concurrent with a turbine trip and unavailability of the standby alternating current power system is a credible event. Lessons learned from the past and recent station blackout events, as well as the analysis of the safety margins performed as part of the ‘stress tests’ conducted on European nuclear power plants in response to the Fukushima Daiichi accident, have identified the station blackout event as a limiting case for most nuclear power plants. The magnitude 9.0 earthquake and consequential tsunami which occurred in Fukushima, Japan, in March 2011, led to a common cause failure of on-site alternating current electrical power supply systems at the Fukushima Daiichi nuclear power plant as well as the off-site power grid. In addition, the resultant flooding caused the loss of direct current power supply, which further exacerbated an already critical situation at the plant. The loss of electrical power resulted in the meltdown of the core in three reactors on the site and severely restricted heat removal from the spent fuel pools for an extended period of time. The plant was left without essential instrumentation and controls, and this made accident management very challenging for the plant operators. The operators attempted to bring and maintain the reactors in a safe state without information on the vital plant parameters until the power supply was eventually restored after several days. Although the Fukushima Daiichi accident progressed well beyond the expected consequences of a station blackout, which is the complete loss of all alternating current power supplies, many of the lessons learned from the accident are valid. A failure of the plant power supply system such as the one that occurred at Fukushima Daiichi represents a design extension condition that requires management with predesigned contingency planning and operator training. The extended loss of all power at a

  7. Design Provisions for Station Blackout at Nuclear Power Plants

    International Nuclear Information System (INIS)

    Duchac, Alexander

    2015-01-01

    A station blackout (SBO) is generally known as 'a plant condition with complete loss of all alternating current (AC) power from off-site sources, from the main generator and from standby AC power sources important to safety to the essential and nonessential switchgear buses. Direct current (DC) power supplies and un-interruptible AC power supplies may be available as long as batteries can supply the loads. Alternate AC power supplies are available'. A draft Safety Guide DS 430 'Design of Electrical Power Systems for Nuclear Power Plants' provides recommendations regarding the implementation of Specific Safety Requirements: Design: Requirement 68 for emergency power systems. The Safety Guide outlines several design measures which are possible as a means of increasing the capability of the electrical power systems to cope with a station blackout, without providing detailed implementation guidance. A committee of international experts and advisors from numerous countries is currently working on an IAEA Technical Document (TECDOC) whose objective is to provide a common international technical basis from which the various criteria for SBO events need to be established, to support operation under design basis and design extension conditions (DEC) at nuclear power plants, to document in a comprehensive manner, all relevant aspects of SBO events at NPPs, and to outline critical issues which reflect the lessons learned from the Fukushima Dai-ichi accident. This paper discusses the commonly encountered difficulties associated with establishing the SBO criteria, shares the best practices, and current strategies used in the design and implementation of SBO provisions and outline the structure of the IAEA's SBO TECDOC under development. (author)

  8. Multivariable control in nuclear power stations -survey of design methods

    International Nuclear Information System (INIS)

    Mcmorran, P.D.

    1979-12-01

    The development of larger nuclear generating stations increases the importance of dynamic interaction between controllers, because each control action may affect several plant outputs. Multivariable control provides the techniques to design controllers which perform well under these conditions. This report is a foundation for further work on the application of multivariable control in AECL. It covers the requirements of control and the fundamental mathematics used, then reviews the most important linear methods, based on both state-space and frequency-response concepts. State-space methods are derived from analysis of the system differential equations, while frequency-response methods use the input-output transfer function. State-space methods covered include linear-quadratic optimal control, pole shifting, and the theory of state observers and estimators. Frequency-response methods include the inverse Nyquist array method, and classical non-interactive techniques. Transfer-function methods are particularly emphasized since they can incorporate ill-defined design criteria. The underlying concepts, and the application strengths and weaknesses of each design method are presented. A review of significant applications is also given. It is concluded that the inverse Nyquist array method, a frequency-response technique based on inverse transfer-function matrices, is preferred for the design of multivariable controllers for nuclear power plants. This method may be supplemented by information obtained from a modal analysis of the plant model. (auth)

  9. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  10. Aseismic design of the Heysham II Nuclear Power Station

    International Nuclear Information System (INIS)

    Day, J.W.

    1983-01-01

    A brief description of the seismic criteria established for use with the Steam Generating Heavy Water Reactor (SCHWR) and taken for the Heysham II Project is given. The qualification strategy adopted for Heysham II is described, and a brief overview is given of some of the more important design changes required for seismic purposes on that station

  11. Monitoring of the operation of a nuclear power station with design problems in an importing country: The Almaraz power station

    International Nuclear Information System (INIS)

    Reig, J.

    1984-01-01

    The purpose of this paper is to describe the regulatory activities carried out in Spain as a result of the design problem occurring in the steam generators during operation of Unit I of the Almaraz nuclear power station. First, a brief introduction is given to the operating history and characteristics of Unit I of Almaraz. Particular attention is paid to the specific licences issued subsequent to commercial operation which place limitations on the operation of the station and to the operational incidents of which the Nuclear Safety Council (CSN) has been notified. Next, a description is provided of the safety evaluation carried out by the CSN. Three aspects merit particular attention: methodology, evaluation and conclusions. The methodology applied by an importing country is normally based on that of the country of origin of the design, so that the overall evaluation by the NRC has been considered sufficiently representative of aspects specific to the Almaraz power station. In this regard the importance of international collaboration is clearly seen as a principal instrument for performing the evaluation. In the evaluation a distinction is made between general and specific aspects and between inspection programmes and quality assurance requirements. In addition, the conclusions leading to the requirement of the imposition of additional limitations on the operating licence are stated. Apart from the safety evaluation carried out by the CSN, other regulatory activities have been performed over this two-year period. These activities, which include site inspections, audits of the principal supplier company, other independent calculations and so on, are described. Lastly, the paper refers to the lessons learned from the operation of the above-mentioned unit, which are immediately applicable to other Spanish nuclear power stations. (author)

  12. Information management for nuclear power stations: System Design Concept

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  13. Power station design and public relations - association with the citizen

    International Nuclear Information System (INIS)

    Eiteneyer, H.

    1977-01-01

    The series of questions concerning public relations, connected with the realization of power plant construction projects will be discussed before the background of the public requirement of electricity supply corporations. It will be explained that public relation cannot be seen as an instrument, having the purpose to inform about 'good or bad' of power plant designs and construction intentions. PR is more a constitutive element of economy policy. Transparent, clear information of the citizen about power plant projects, and power plant related procedures should be their targets. This signifies a distance from just technical presentation. PR must develop in the direction to active corporational strategy, taking psychological- and social psychological influences into consideration. Statements will be made in regard to the dialogue between power plant advocates and power plant opponents. The special responsibility of the public electricity supply corporations for an always sufficient, safe and economical supply to the consumer, will be pointed out. Better information of the public in this regard is a necessary requirement. (orig.) [de

  14. Standard concerning the design of nuclear power stations in earthquake-prone districts

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Anbriashivili, Y.K.; Suvilova, A.V.

    1980-01-01

    The measures of security assurance against the effect of radioactive contamination has become more and more complex due to the construction of nuclear power stations of diverse types. The aseismatic measures for the nuclear power stations built in the districts where earthquakes of different intensity occur are important problems. All main machinery and equipments and emergency systems in power stations must be protected from earthquakes, and this makes the solution of problems difficult. At present in USSR, the provisional standard concerning the design of atomic energy facilities built in earthquake-prone districts is completed. The basic philosophy of the standard is to decide the general requirements as the conditions for the design of nuclear power stations built in earthquake-prone districts. The lowest earthquake activity in the construction districts is considered as magnitude 4, and in the districts where earthquake activity is magnitude 9 or more, the construction of nuclear power stations is prohibited. Two levels of earthquake action are specified for the design: design earthquake and the largest design earthquake. The construction sites of nuclear power stations must be 15 to 150 km distant from the potential sources of earthquakes. Nuclear power stations are regarded as the aseismatically guaranteed type when the safety of reactors is secured under the application of the standard. The buildings and installations are classified into three classes regarding the aseismatic properties. (Kako, I.)

  15. Design and modeling of low temperature solar thermal power station

    International Nuclear Information System (INIS)

    Shankar Ganesh, N.; Srinivas, T.

    2012-01-01

    Highlights: ► The optimum conditions are different for efficiency and power conditions. ► The current model works up to a maximum separator temperature of 150 °C. ► The turbine concentration influences the high pressure. ► High solar beam radiation and optimized cycle conditions give low collector cost. -- Abstract: During the heat recovery in a Kalina cycle, a binary aqua–ammonia mixture changes its state from liquid to vapor, the more volatile ammonia vaporizes first and then the water starts vaporization to match temperature profile of the hot fluid. In the present work, a low temperature Kalina cycle has been investigated to optimize the heat recovery from solar thermal collectors. Hot fluid coming from solar parabolic trough collector with vacuum tubes is used to generate ammonia rich vapor in a boiler for power generation. The turbine inlet conditions are optimized to match the variable hot fluid temperature with the intermittent nature of the solar radiation. The key parameters discussed in this study are strong solution concentration, separator temperature which affects the hot fluid inlet temperature and turbine ammonia concentration. Solar parabolic collector system with vacuum tubes has been designed at the optimized power plant conditions. This work can be used in the selection of boiler, separator and turbine conditions to maximize the power output as well as efficiency of power generation system. The current model results a maximum limit temperature for separator as 150 °C at the Indian climatic conditions. A maximum specific power of 105 kW per kg/s of working fluid can be obtained at 80% of strong solution concentration with 140 °C separator temperature. The corresponding plant and cycle efficiencies are 5.25% and 13% respectively. But the maximum efficiencies of 6% and 15% can be obtained respectively for plant and Kalina cycle at 150 °C of separator temperature.

  16. Design of a photovoltaic central power station: flat-plate array

    Energy Technology Data Exchange (ETDEWEB)

    1984-02-01

    A design for a photovoltaic central power station using fixed flat-panel arrays has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes high-efficiency photovoltaic modules using dendritic web cells. The modules are arranged in 5 MW subfields, each with its own power conditioning unit. The photovoltaic output is connected to the existing 115 kV utility switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

  17. Design, modeling and testing of the Askaryan Radio Array South Pole autonomous renewable power stations

    Energy Technology Data Exchange (ETDEWEB)

    Besson, D.Z., E-mail: zedlam@ku.edu [Department of Physics and Astronomy, University of Kansas, 1082 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Moscow Engineering and Physics Institute, 31 Kashirskaya Highway, Moscow 115409 (Russian Federation); Kennedy, D.M., E-mail: dmkennedy@ku.edu [Department of Physics and Astronomy, University of Kansas, 1082 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Ratzlaff, K., E-mail: ratzlaff@ku.edu [Instrumentation Design Laboratory, University of Kansas, 6042 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Young, R., E-mail: rwyoung@ku.edu [Instrumentation Design Laboratory, University of Kansas, 6042 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States)

    2014-11-01

    We describe the design, construction and operation of the Askaryan Radio Array (ARA) Autonomous Renewable Power Stations, initially installed at the South Pole in December, 2010 with the goal of providing an independently operating 100 W power source capable of year-round operation in extreme environments. In addition to particle astrophysics applications at the South Pole, such a station can easily be, and has since been, extended to operation elsewhere, as described herein.

  18. Civil engineering in nuclear power stations: design of the turbine building and nuclear auxiliary building

    International Nuclear Information System (INIS)

    Lacroix, R.

    1985-01-01

    After enumerating the specific features of civil engineering in nuclear power stations. One goes on to examine the principal deliberations undertaken with the aim of optimising projects for transition from the P4 to P'4 and then N4 generations of nuclear power stations. The courses of action decided with respect to the design of the machine room and auxiliary equipment building are described [fr

  19. Design, modeling and testing of the Askaryan Radio Array South Pole autonomous renewable power stations

    International Nuclear Information System (INIS)

    Besson, D.Z.; Kennedy, D.M.; Ratzlaff, K.; Young, R.

    2014-01-01

    We describe the design, construction and operation of the Askaryan Radio Array (ARA) Autonomous Renewable Power Stations, initially installed at the South Pole in December, 2010 with the goal of providing an independently operating 100 W power source capable of year-round operation in extreme environments. In addition to particle astrophysics applications at the South Pole, such a station can easily be, and has since been, extended to operation elsewhere, as described herein

  20. Application exploration of primavera6.0 for design-schedule in nuclear power station

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2009-01-01

    The ideas and flow of plan establishment during the nuclear power station design is discussed in this paper, including the main steps in the plan establishment, and the design schedule and the management of documents and interfaces are improved. An integral design management innovation is proposed for the management of 'schedule, interfaces and drawings and files'. (authors)

  1. Criteria for the design of the control room complex for a nuclear power generating station

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This Standard addresses the central control room of a nuclear power generating station and the overall complex in which this room is housed. It is not intended to cover special or normally unattended control rooms, such as those provided for radioactive waste handling or for emergency shutdown operations. The nuclear power generating station control room complex provides a protective envelope for plant operating personnel and for instrument and control equipment vital to the operation of the plant during normal and abnormal conditions. In this capacity, the control room complex must be designed and constructed to meet the following criteria contained in Appendix A of 10CFR50, General Design criteria for Nuclear Power Plants: (1) Criterion 2: design bases for protection against natural phenomena; (2) Criterion 3: fire protection; (3) Criterion 4: environmental and missile design bases; (4) Criterion 5: sharing of structures, systems and components (multiunit stations only); and (5) Criterion 19: control room

  2. Nuclear power station: validation of a method for designing operation mimic diagrams

    International Nuclear Information System (INIS)

    Colard, M.I.; De Vlaminck, M.; Javaux, D.

    1995-01-01

    This is the first time in a Belgium nuclear power station that the design of mimic diagrams has involved biotechnologists. The methodology is based upon task analysis, the formalism of which has been evaluated. It is now integrated in the Dimos assisted supervision system to produce the final design of mimic diagram images. (authors). 3 figs., 3 refs

  3. Design of large steam turbines for PWR power stations

    International Nuclear Information System (INIS)

    Hobson, G.; Muscroft, J.

    1983-01-01

    The thermodynamic cycle requirements for use with pressurized water reactors are reviewed and the manner in which thermal efficiency is maximised is outlined. The special nature of the wet steam cycle associated with turbines for this type of reactor is discussed. Machine and cycle parameters are optimised to achieve high thermal efficiency, particular attention being given to arrangements for water separation and steam reheating and to provisions for feedwater heating. Principles and details of mechanical design are considered for a range of both full-speed turbines running at 3000 rpm on 50 Hz systems and half-speed turbines running at 1800 rpm on 60 Hz systems. The importance of service experience with nuclear wet steam turbines and its relevance to the design of modern turbines for pressurized water reactor applications is discussed. (author)

  4. Design of large steam turbines for PWR power stations

    International Nuclear Information System (INIS)

    Hobson, G.

    1984-01-01

    The authors review the thermodynamic cycle requirements for use with pressurized-water reactors, outline the way thermal efficiency is maximized, and discuss the special nature of the wet-steam cycle associated with turbines for this type of reactor. Machine and cycle parameters are optimized to achieve high thermal efficiency, particular attention being given to arrangements for water separation and steam reheating and to provisions for feedwater heating. Principles and details of mechanical design are considered for a range both of full-speed turbines running at 3000 rev/min on 50 Hz systems and of half-speed turbines running at 1800 rev/min on 60 Hz systems. The importance of service experience with nuclear wet-stream turbines, and its relevance to the design of modern turbines for PWR applications, is discussed. (author)

  5. In core reload design for cycle 4 of Daya Bay nuclear power station both units

    International Nuclear Information System (INIS)

    Zhang Zongyao; Liu Xudong; Xian Chunyu; Li Dongsheng; Zhang Hong; Liu Changwen; Rui Min; Wang Yingming; Zhao Ke; Zhang Hong; Xiao Min

    1998-01-01

    The basic principles and the contents of the reload design for Daya Bay nuclear power station are briefly introduced. The in core reload design results, and the comparison between the calculated values and the measured values of both units the fourth cycle are also given. The reload design results of the two units satisfy all the economic requirements and safety criteria. The experimented results shown that the predicated values are tally good with all the measurement values

  6. The next nuclear power station generation: Beyond-design accident concepts, methods, and action sequence

    International Nuclear Information System (INIS)

    Asmolov, V.G.; Khakh, O.Ya.; Shashkov, M.G.

    1993-01-01

    The problem of beyond-design accidents at nuclear stations will not be solved unless a safety culture becomes a basic characteristic of all lines of activity. Only then can the danger of accidents as an objective feature of nuclear stations be eliminated by purposive skilled and responsible activities of those implementing safety. Nuclear-station safety is provided by the following interacting and complementary lines of activity: (1) the design and construction of nuclear stations by properly qualified design and building organizations; (2) monitoring and supervision of safety by special state bodies; (3) control of the station by the exploiting organization; and (4) scientific examination of safety within the above framework and by independent organizations. The distribution of the responsibilities, powers, and right in these lines should be defined by a law on atomic energy, but there is not such law in Russian. The beyond-design accident problem is a key one in nuclear station safety, as it clear from the serious experience with accidents and numerous probabilistic studies. There are four features of the state of this topic in Russia that are of major significance for managing accidents: the lack of an atomic energy law, the inadequacy of the technical standards, the lack of a verified program package for nuclear-station designs in order to calculate the beyond-design accidents and analyze risks, and a lack of approach by designers to such accidents on the basis of international recommendations. This paper gives a brief description of three-forming points in the scientific activity: the general concept of nuclear-station safety, methods of analyzing and providing accident management, and the sequence of actions developed by specialists at this institute in recent years

  7. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Yoshio; Nakagami, Yasuo; Fujii, Hisashi; Shibanai, Hirooki.

    1980-01-01

    Two 1175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  8. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Y.; Nakagami, Y.; Fujii, H.; Shibanai, H.

    1980-01-01

    Two 1,175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  9. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  10. The application of the ALARP principle to the design of nuclear power stations

    International Nuclear Information System (INIS)

    Pugh, I.G.; Eaton, J.R.P.; Dutton, L.M.C.; Youell, F.P.

    1987-01-01

    A summary is given of the numerical fundamental design criteria specified to ensure nuclear reactor safety; these numerical criteria are compared to ICRP dose limits in order to demonstrate the important role of the criteria in achieving 'ALARP'. The design strategy which has been applied to both AGR and PWR power stations to ensure compliance with the design criteria and guidelines is described. The application of the strategy to Heysham II/ Torness and Sizewell 'B' demonstrates its effectiveness. Details of radiation exposures to operators and the public both in normal operation and following accidents are given including examples of cost-benefit analysis studies. (UK)

  11. Islands for nuclear power stations

    International Nuclear Information System (INIS)

    Usher, E.F.F.W.; Fraser, A.P.

    1981-01-01

    The safety principles, design criteria and types of artificial island for an offshore nuclear power station are discussed with particular reference to siting adjacent to an industrial island. The paper concludes that the engineering problems are soluble and that offshore nuclear power stations will eventually be built but that much fundamental work is still required. (author)

  12. An examination on aseismatic design of civil engineering structures in nuclear power stations

    International Nuclear Information System (INIS)

    Aida, Masakazu; Nakamura, Haruaki; Suzuki, Hideya

    1990-01-01

    As for the aseismatic design of civil engineering structures in nuclear power stations, the basic way of thinking and the example design are shown in the technical guidelines and others, but when the aseismatic design is actually carried out, the techniques of aseismatic calculation and the modeling for structural analysis are left to the judgement of designers. Among such various problems, in this report, the applicability of response displacement method and response magnitude method as the aseismatic calculation techniques and the necessity of rigid region in rahmen members in structural analysis were examined, and those are described. As the structures in nuclear power stations, there are cooling water intake and discharge facilities, emergency water intake, breakwater, unloading quays, revetments, the foundations of tanks, machinery and equipment, piping and others, roads, bridges, tunnels and so on. The outline of their aseismatic design and the examination on the cases of aseismatic design are reported. These structures are frequently underground structures, which are different from those on the ground. (K.I.)

  13. Pumping station design for a pumped-storage wind-hydro power plant

    International Nuclear Information System (INIS)

    Anagnostopoulos, John S.; Papantonis, Dimitris E.

    2007-01-01

    This work presents a numerical study of the optimum sizing and design of a pumping station unit in a hybrid wind-hydro plant. The standard design that consists of a number of identical pumps operating in parallel is examined in comparison with two other configurations, using one variable-speed pump or an additional set of smaller jockey pumps. The aim is to reduce the amount of the wind generated energy that cannot be transformed to hydraulic energy due to power operation limits of the pumps and the resulting step-wise operation of the pumping station. The plant operation for a period of one year is simulated by a comprehensive evaluation algorithm, which also performs a detailed economic analysis of the plant using dynamic evaluation methods. A preliminary study of the entire plant sizing is carried out at first using an optimization tool based on evolutionary algorithms. The performance of the three examined pumping station units is then computed and analyzed in a comparative study. The results reveal that the use of a variable-speed pump constitutes the most effective and profitable solution, and its superiority is more pronounced for less dispersed wind power potential

  14. Electrical Power System Design and Station Blackout (SBO) Management in Indian Fast Breeder Reactors

    International Nuclear Information System (INIS)

    Vijaya, N. M.; Theivarajan, N.; Madhusoodanan, K.

    2015-01-01

    In the nuclear new builds and projects in design stage SBO management measures have significant role. Depending on the onsite and offsite power supply configurations, deterministic SBO duration is established. Design of systems with adequately sized battery capacities for SBO duration, special SBO Diesel Generator Sets, structured load shedding strategy to conserve battery availability to cope with SBO and to monitor the plant safety beyond SBO duration are considered as part of electrical system design now. In the design of PFBR, SBO is given due importance right from conceptual design stage. Both deterministic SBO duration and probabilistic SBO duration versus frequency were established by detailed analysis. Dedicated DC power supply systems and additional SBO DG back-up systems are in place to cope with normal and extended SBO. After the Fukushima event, there is greater requirement to demonstrate plant safety during SBO for a long duration extended over several days. In light of this accident, thermal hydraulic synthesis of PFBR has been carried out to ascertain the capability of the plant to manage a prolonged station blackout event. This has brought out the robustness of the design. Safety design features of PFBR ensure comfortable management of extended SBO. In the design of future FBR projects, current trends in the new nuclear builds and recommendations of international bodies considering Fukushima are duly considered. SBO measures by means of alternate AC power sources, redundant emergency power supply sources with less dependence on other auxiliary systems and dedicated DC power systems are considered to cope with normal and extended SBO beyond design basis. Right from the conceptual design, the system robustness to manage normal and extended SBO will be taken care with the related thermal hydraulic and associated analysis. The paper highlights these SBO management strategies in PFBR and future FBRs. (author)

  15. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    Energy Technology Data Exchange (ETDEWEB)

    Charcharos, A N; Jones, A G [National Nuclear Corp. Ltd., Cheshire (United Kingdom)

    1984-07-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  16. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    International Nuclear Information System (INIS)

    Charcharos, A.N.; Jones, A.G.

    1984-01-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  17. A modular Space Station/Base electrical power system - Requirements and design study.

    Science.gov (United States)

    Eliason, J. T.; Adkisson, W. B.

    1972-01-01

    The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

  18. Aseismatic design and safety of nuclear power generation facilities. On aseismatic capability of commercial nuclear power stations

    International Nuclear Information System (INIS)

    Kato, Muneaki

    1995-01-01

    In view of the great Hanshin earthquake, the aseismatic safety of the important facilities in nuclear power stations is ensured by the location direct on base rocks, the design with the earthquake force at least three times as large as that in the building standard, and the consideration of the earthquakes due to active faults as design earthquake. The basic policy of the aseismatic design of nuclear power stations is described. The determination of the earthquake motions due to strongest earthquake and utmost limit earthquake for design, the survey of the geological features and ground of the sites and so on are explained. In the aseismatic design of buildings and structures, structural planning, the modeling for the aseismatic analysis of buildings, the analysis of time historical response and so on are carried out. In the aseismatic design of equipment and piping systems, the planning of aseismatic support structures, the aseismatic design and the analysis of time historical response, the spectral modal analysis for other systems such as multiple material point system and so on are described. The tests and researches related to the aseismatic design are reported. (K.I.)

  19. Design and construction of Minokawai hydro-power station; Minokawai suiryoku hatsudensho no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Kudo, A; Murakami, H; Hatano, K [Kansai Electric Power Co. Inc., Osaka (Japan)

    1994-09-05

    Minokawai power station is a plant with low head and large water quantity (output: 23.4MW) that utilizes Imawatari dam down the Kiso river. In constructing this power station, vertical drilling of about 33m in depth was executed in soft sedimentary rock area with uniaxial compression strength of 100kgf/cm{sup 2} or so. This report describes the geological condition in the drilling area and the outline of design and execution of corresponding landslide preventions. The drilling area mainly consists of tuff-containing sandstone and conglomerate with several weak layers such as lignite layers, and its stratum slopes gently from the mountain side to the river side. When the landslide preventions were designed, it was especially considered to secure stability of the drilling surface of earth filling as well as to control shear deformation along the lignite layer. Based on the two-dimensional elasto-plastic FEM analysis, structural design of landslide prevention walls and reinforcing methods using ground anchors and lock-bolts were determined. Construction works have been proceeded with as the ground behavior has been measured and controlled by setting many instruments such as insertion-type clinometers on the landslide preventions and the back ground. 2 refs., 18 figs., 5 tabs.

  20. IEEE standard for design qualification of safety systems equipment used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This standard is written to serve as a general standard for qualification of all types of safety systems equipment, mechanical and instrumentation as well as electrical. It also establishes principles and procedures to be followed in preparing specific safety systems equipment standards. Guidance for qualifying specific safety systems equipment may be found in various specific equipment qualification standards that are now available or are being prepared. It is required that safety systems equipment in nuclear power generating stations meet or exceed its performance requirements throughout its installed life. This is accomplished by a disciplined program of design qualification and quality assurance of design, production, installation, maintenance and surveillance. This standard is for the design qualification section of the program only. Design qualification is intended to demonstrate the capability of the equipment design to perform its safety function(s) over the expected range of normal, abnormal, design basis event, post design basis event, and in-service test conditions. Inherent to design qualification is the requirement for demonstration, within limitations afforded by established technical state-of-the-art, that in-service aging throughout the qualified life established for the equipment will not degrade safety systems equipment from its original design condition to the point where it cannot perform its required safety function(s), upon demand. The above requirement reflects the primary role of design qualification to provide reasonable assurance that design- and age-related common failure modes will not occur during performance of safety function(s) under postulated service conditions

  1. Innovations in PHWR design, integration of nuclear power stations into power systems and role of small size nuclear power plants in a developing country

    International Nuclear Information System (INIS)

    Mehta, S.K.; Kakodkar, A.; Balakrishnan, M.R.; Ray, R.N.; Murthy, L.G.K.; Chamany, B.F.; Kati, S.L.

    1977-01-01

    PHWR concept of thermal reactors has been considered with a view to exploiting the limited resources of natural uranium and keeping in mind the projected nuclear power programme covering fast breeder reactors. Experience in engineering of current PHWR units in India, gradual build up of necessary infrastructure and operational experience with one unit, have helped in building up design and technological capability in the country. The R and D facilities have been so planned that additional data required for the design of bigger reactor units (i.e.500/600 MWe) could be generated with minimal augmentation. Satisfactory operation of a nuclear power station demands certain prerequisites from the connected power system. The grid should have load patterns suitable for base load operation of these stations, should be stiff so far as voltage and frequency fluctuations are concerned and should have high reliability. A typical power grid in this country is characterised by heavy loads during peak hours and very light loads during night. Regional grids are of small size and the few interconnections existing between the regional grids consist of weak tie lines. Amongst all types of the power stations, it is the nuclear system which undergoes maximum strain and economic penalty while operating when connected to such a power system. Consistent with the above, phase installation of small-size power reactor units of about 200 MWe capacity may facilitate setting up of larger unit sizes at a later date. The effect of any possible reduction in the capital cost of a larger unit power station will enable the power station to partially meet the demand of the more productive types of loads. This paper deals with some of the major design changes that are being incorporated in the PHWR type power reactors currently being set up and the research and development back-up required for the purpose. Since the unit sizes of the power reactors presently contemplated are small compared to nuclear

  2. East/West cooperation on the safety of USSR-designed nuclear power stations

    International Nuclear Information System (INIS)

    Spencer, P.H.

    1991-01-01

    In the aftermath of the accident at the Chernobyl nuclear power station in the Soviet Union, nuclear power plant operators throughout the world came together in May 1989 to form the World Association of Nuclear Operators (WANO). When it became clear that the operators of plants of an early design supplied by the USSR needed assistance in the upgrading of the safety of these units, WANO was uniquely placed to assist and facilitate in this. In July 1990, WANO took the decision to form a special project to assist the operators of the VVER 440/230 plants in their efforts to increase the safety standards for these units. The work performed by this special project team is described

  3. Tobruk power station

    Energy Technology Data Exchange (ETDEWEB)

    Boergardts, B

    1978-01-01

    In February of 1975, the Electricity Corporation Benghazi (ECB) awarded a contract for the construction of a turnkey power station and seawater desalination plant in Tobruk, Libya to a consortium under the leadership of BBC Mannheim. This power station has an output of 129 MW and supplies about 24,000 m/sup 3/ of drinking water daily. It went into operation in 1977, two and a half years after the contract was awarded.

  4. An overview of some basic design features of Koeberg Nuclear Power Station highlighting how regulatory requirements can influence design

    International Nuclear Information System (INIS)

    Morrison, A.R.

    1985-01-01

    The paper attempts to show that licensing requirements significantly influence the design of nuclear power plants. The French designed Pressurised Water Reactor system adopted by Escom at Koeberg has its origins in the General Design Criteria set out in the American Code of Federal Regulations document 10CFR50. Three of the General Design Criteria have been selected for illustrating how the requirements have influenced Koeberg in terms of design, both from a hardware and software view point. The requirements of the criteria on quality standard and records are to a certain extent reflected in the Licensing Branch Guide developed by the Atomic Energy Corporation to address quality assurance. The criterion on containment design sets requirements in respect of containment design which are incorporated in the Koeberg design. The criterion on electric power systems sets many of the basic design requirements for the electrical power supply systems inside and outside the station. The existence of the criterion led Escom to introduce changes in the transmission network to meet the requirements in respect of the independent criteria for the grid connections

  5. The Trencin water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Trencin water power station. The Trencin water power station was built seven years after the Dubnica nad Vahom water power station started its operation and was the last stage of the first and the oldest derived cascade of water power stations on the Vah River. After completing water power stations at Ladce (1936), Ilava (1946) and Dubnica nad Vahom (1949) and before constructing the Trencin water power station, the whole second derived cascade of water power stations including water power stations at Kostolna, Nove Mesto nad Vahom and Horna Streda was built as soon as possible mainly because the need to get compensation for discontinued electricity supplies as well as energetic coal from the Czech Republic. Hereby, experiences from the construction of previous grades were used, mainly as far as the dimensioning was concerned, as the fi rst installed power stations had, in comparison with the growing requirements on the electricity supplies, very low absorption capacity - only 150 m 3 .s -1 . Thus the Trencin power station (original name was the Skalka power station) was already dimensioned for the same absorption capacity as the cascade located downstream the river, that is 180 m 3 .s -1 . That was related also to growing demands on electricity supplies during the peaks in the daily electric system load diagram, and thus to the transfer from continuous operation of the water power station to semi-peak or even peak performance. According to the standards of power station classification, the Trencin water power station is a medium size, low pressure, channel power station with two units equipped by Kaplan turbines and synchronous hydro-alternators. The water power station installed capacity is 16.1 MW in total and its designed annual production of electrical energy for medium water year is 85,000 MWh, while the average annual production during the last 30 years is 86,252 MWh. Installed unit has a four-blade Kaplan turbine with the diameter

  6. Design and implementation of data acquisition, communication and monitoring system for photovoltaic power station in microgrid

    Energy Technology Data Exchange (ETDEWEB)

    Deng, Wei; Pei, Wei; Qi, Zhiping; Kong, Li [Institute of Electrical Engineering, CAS, Beijing (China)

    2008-07-01

    This paper presents the design and realization of data acquisition, communication and monitoring system for photovoltaic power station. The data acquisition module including filter algorithm and signal modulation circuit uses the digital signal processor (DSP) as the main processor, it can realize accurate real-time data acquisition; The data communication module uses Ethernet as communication network between PV system and MicroGrid. The gateway using ARM microprocessor can realize protocol conversion and bidirectional communication between CAN Bus and Ethernet; The monitoring unit with friendly human-machine interface keeps real-time performance monitoring of PV system to realize automation control. The results of experiment show that the system is practicable and effective. (orig.)

  7. Application of nuclear power station design criteria to non-nuclear installations

    International Nuclear Information System (INIS)

    Regan, J.D.; Hughes, D.J.

    1989-01-01

    The nuclear industry is multi faceted, in that it includes large and complex chemical plants, a large number of different types of nuclear power stations, and on shore ship maintenance facilities, each with its own unique problems. Since the early days the industry has been aware of the additional problem which is superimposed on what may be classed as traditional fire risks, that is, the risk of an uncontrolled release of radioactivity. This has led to the development of sophisticated fire prevention and control techniques which are applied to new plants, and to the backfitting of older plants. The techniques of analysis, design and operation can be applied to both nuclear and non-nuclear installations. Passive protection is preferred backed up by active techniques. Segregation of essential plant to increase the probability of sufficient surviving to ensure safety systems operate and the provision of smoke free, protected escape routes are important aspects of layout and design. Reliability assessments, venting of smoke and hot gases, fire severity analysis, application of mathematical models contribute to the final design to protect against fires. Experiences built up in the fire fighting profession is integrated into the numerical approach by frequent involvement of the local Fire Officers at each stage of the design and layout of installations. (author)

  8. Hinkley Point 'C' power station public inquiry: proof of evidence on design and safety

    International Nuclear Information System (INIS)

    George, B.V.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom. The policy is to replicate the Sizewell ''B'' PWR design. The Hinkley Point ''C'' design is described indicating where changes in the Sizewell ''B'' design have been made to accommodate site differences. These are associated with the civil engineering construction and some of the electrical systems and do not affect the safety case. External hazards differ from site to site and the effect on the safety case of those specific to Hinkley Point are examined. The Chernobyl accident and the assessment of the United Kingdom PWR which was carried out subsequently are reviewed. The assessment indicated that no changes in the Sizewell ''B'' design and safety case were called for as a result of this accident; accident management developments are also reviewed, however. The CEGB's approach to minimizing occupational radiation doses is described. (UK)

  9. The Paks Nuclear Power Station

    International Nuclear Information System (INIS)

    Erdosi, N.; Szabo, L.

    1978-01-01

    As the first stage in the construction of the Paks Nuclear Power Station, two units of 440 MW(e) each will be built. They are operated with two coolant loops each. The reactor units are VVER 440 type water-moderated PWR type heterogeneous power reactors designed in the Soviet Union and manufactured in Czechoslovakia. Each unit operates two Soviet-made K-220-44 steam turbines and Hungarian-made generators of an effective output of 220 MW. The output of the transformer units - also of Hungarian made - is 270 MVA. The radiation protection system of the nuclear power station is described. Protection against system failures is accomplished by specially designed equipment and security measures especially within the primary circuit. Some data on the power station under construction are given. (R.P.)

  10. Fire protection concept for power stations

    International Nuclear Information System (INIS)

    Zitzmann, H.

    The author shows how a systematic approach permits the design of a fire-protected power station. The special conditions of an individual power station are here treated as marginal conditions. The article describes how the concept is realized in the completed power station, taking account of the information provided by fire statistics. (orig.) [de

  11. Potential human factors deficiencies in the design of local control stations and operator interfaces in nuclear power plants

    International Nuclear Information System (INIS)

    Hartley, C.S.; Levy, I.S.; Fecht, B.A.

    1984-04-01

    The Pacific Northwest Laboratory has completed a project to identify human factors deficiencies in safety-significant control stations outside the control room of a nuclear power plant and to determine whether NUREG-0700, Guidelines for Control Room Design Reviews, would be sufficient for reviewing those local control stations (LCSs). The project accomplished this task by first, reviewing existing data pertaining to human factors deficiencies in LCSs involved in significant safety actions; second, surveying LCSs environments and design features at several operating nuclear power plants; and third, assessing the results of that survey relative to the contents of NUREG-0700

  12. The nuclear power station

    International Nuclear Information System (INIS)

    Plettner, B.

    1987-04-01

    The processes taking place in a nuclear power plant and the dangers arising from a nuclear power station are described. The means and methods of controlling, monitoring, and protecting the plant and things that can go wrong are presented. There is also a short discourse on the research carried out in the USA and Germany, aimed at assessing the risks of utilising nuclear energy by means of the incident tree analysis and probability calculations. (DG) [de

  13. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  14. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  15. Perfection of design of soil dams of small hydroelectric power stations

    International Nuclear Information System (INIS)

    Inoyatov, M.B.; Rasulov, S.

    2008-01-01

    The important question connected with building of dams of smallhydroelectric power stations in rock conditions is water filtration throughthe side of dam containing as a rule the alluvial material. This process canbe accompanied by internal erosion long-term exposure of which lead tocarry-over more bigger particles with progressive increasing permeabilitytill catastrophic level. This question authors consider in this article

  16. Design of FPGA Based Neural Network Controller for Earth Station Power System

    Directory of Open Access Journals (Sweden)

    Hassen T. Dorrah

    2012-06-01

    Full Text Available Automation of generating hardware description language code from neural networks models can highly decrease time of implementation those networks into a digital devices, thus significant money savings. To implement the neural network into hardware designer, it is required to translate generated model into device structure. VHDL language is used to describe those networks into hardware. VHDL code has been proposed to implement ANNs as well as to present simulation results with floating point arithmetic of the earth station and the satellite power systems using ModelSim PE 6.6 simulator tool. Integration between MATLAB and VHDL is used to save execution time of computation. The results shows that a good agreement between MATLAB and VHDL and a fast/flexible feed forward NN which is capable of dealing with floating point arithmetic operations; minimum number of CLB slices; and good speed of performance. FPGA synthesis results are obtained with view RTL schematic and technology schematic from Xilinix tool. Minimum number of utilized resources is obtained by using Xilinix VERTIX5.

  17. Effects of design on cost of flat-plate solar photovoltaic arrays for terrestrial central station power applications

    Science.gov (United States)

    Tsou, P.; Stolte, W.

    1978-01-01

    The paper examines the impact of module and array designs on the balance-of-plant costs for flat-plate terrestrial central station power applications. Consideration is given to the following types of arrays: horizontal, tandem, augmented, tilt adjusted, and E-W tracking. The life-cycle cost of a 20-year plant life serves as the costing criteria for making design and cost tradeoffs. A tailored code of accounts is developed for determining consistent photovoltaic power plant costs and providing credible photovoltaic system cost baselines for flat-plate module and array designs by costing several varying array design approaches.

  18. Reviewing nuclear power station achievement

    International Nuclear Information System (INIS)

    Howles, L.R.

    1976-01-01

    For measurement of nuclear power station achievement against original purchase the usual gross output figures are of little value since the term loosely covers many different definitions. An authentically designed output figure has been established which relates to net design output plus house load at full load. Based on these figures both cumulative and moving annual load factors are measured, the latter measuring the achievement over the last year, thus showing trends with time. Calculations have been carried out for all nuclear stations in the Western World with 150 MW(e) gross design output and above. From these are shown: moving annual load factor indicating relative station achievements for all the plants; cumulative load factors from which return of investment can be calculated; average moving annual load factors for the four types of system Magnox, PWR, HWR, and BWR; and a relative comparison of achievement by country in a few cases. (U.K.)

  19. Design improvements to achieve ALARA exposures to plant personnel at Narora Atomic Power Station (NAPS)

    International Nuclear Information System (INIS)

    Mittal, S.; Mehta, H.C.; Roy, S.K.

    2000-01-01

    NAPS is the indigenously designed, constructed and commissioned, first PHWR station of standardized design for 220 MWe station of NPCIL. At NAPS, radiation fields started building up after first start up due to Cobalt-60 and this was a major concern, from collective dose point of view, for carrying out any activity specially around and with in the moderator system. Apart from this system, PHT and fueling machine areas are also vulnerable areas from radiation point of view. To reduce and control the high collective dose consumption, various design modifications; like moderator purification system modifications, changes in heavy water recovery arrangements and FT system, have been carried out at NAPS and these are discussed in this paper. (author)

  20. Pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Ogura, Shiro

    1979-01-01

    16 nuclear power plants are in commercial operation in Japan, and nuclear power generation holds the most important position among various substitute energies. Hereafter also, it is expected that the construction of nuclear power stations will continue because other advantageous energy sources are not found. In this paper, the outline of the pumps used for BWR plants is described. Nuclear power stations tend to be large scale to reduce the construction cost per unit power output, therefore the pumps used are those of large capacity. The conditions to be taken in consideration are high temperature, high pressure, radioactive fluids, high reliability, hydrodynamic performances, aseismatic design, relevant laws and regulations, and quality assurance. Pumps are used for reactor recirculation system, control rod driving hydraulic system, boric acid solution injecting system, reactor coolant purifying system, fuel pool cooling and purifying system, residual heat removing system, low pressure and high pressure core spraying systems, and reactor isolation cooling system, for condensate, feed water, drain and circulating water systems of turbines, for fresh water, sea water, make-up water and fire fighting services, and for radioactive waste treating system. The problems of the pumps used for nuclear power stations are described, for example, the requirement of high reliability, the measures to radioactivity and the aseismatic design. (Kako, I.)

  1. Central Station Design Options

    DEFF Research Database (Denmark)

    2011-01-01

    . The work identifies the architecture, sizing and siting of prospective Central Stations in Denmark, which can be located at shopping centers, large car parking lots or gas stations. Central Stations are planned to be integrated in the Danish distribution grid. The Danish island of Bornholm, where a high...... overloading, more reference points might be necessary to represent various transformer loading levels. The subject of safety in Central Station is also addressed. A number of safety rules based on European standards apply to AC charging equipment up to 44 kW. The connection interlock and the automatic de......-energization are identified as fundamental requirements for safety in such a charging station. The connection interlock is a solution which ensures that no power is applied to the DC cable when the EV connector is not connected. The automatic de-energization device ensures that whenever a strain on the cable is detected, e...

  2. Wind turbine power stations

    International Nuclear Information System (INIS)

    Anon.

    1992-11-01

    The Countryside Council for Wales (CCW's) policy on wind turbine power stations needs to be read in the context of CCW's document Energy:Policy and perspectives for the Welsh countryside. This identifies four levels of action aimed at reducing emission of gases which contribute towards the risk of global warming and gases which cause acid deposition. These are: the need for investment in energy efficiency; the need for investment in conventional power generation in order to meet the highest environmental standards; the need for investment in renewable energy; and the need to use land use transportation policies and decisions to ensure energy efficiency and energy conservation. CCW views wind turbine power stations, along with other renewable energy systems, within this framework. CCW's policy is to welcome the exploitation of renewable energy sources as an element in a complete and environmentally sensitive energy policy, subject to the Environmental Assessment of individual schemes and monitoring of the long-term impact of the various technologies involved. (Author)

  3. Design of electric vehicle charging station based on wind and solar complementary power supply

    Science.gov (United States)

    Wang, Li

    2018-05-01

    Electric vehicles have become a major trend in the development of the automobile industry. Green energy saving is an important feature of their development. At the same time, the related charging facilities construction is also critical. If we improve the charging measures to adapt to its green energy-saving features, it will be to a greater extent to promote its further development. This article will propose a highly efficient green energy-saving charging station designed for the electric vehicles.

  4. Space Station galley design

    Science.gov (United States)

    Trabanino, Rudy; Murphy, George L.; Yakut, M. M.

    1986-01-01

    An Advanced Food Hardware System galley for the initial operating capability (IOC) Space Station is discussed. Space Station will employ food hardware items that have never been flown in space, such as a dishwasher, microwave oven, blender/mixer, bulk food and beverage dispensers, automated food inventory management, a trash compactor, and an advanced technology refrigerator/freezer. These new technologies and designs are described and the trades, design, development, and testing associated with each are summarized.

  5. Controversial power station

    International Nuclear Information System (INIS)

    Marcan, P.

    2008-01-01

    When information on plans to build a power station in Trebisov first appeared reactions differed. A 40-billion investment in a town with more than 20% unemployment seemed attractive. But some people did not like the idea of having a power plant located in the town. Around one year after the investment was officially announced TREND returned to Trebisov. In the meantime the investor has managed to overcome one of the biggest obstacles on its way to building a new power plant. The ministry responsible gave the environmental study a positive rating. But objectors are still not sure that everything is fine. They claim that the study misinterprets data and that the ministry did not show expertise when evaluating it. 'Is it possible that a coal power plant located in a town would have twice as many positive effects on peoples' health than negative ones? Why don't we build them everywhere?'asked the chairman of the civic society, Trebisov nahlas, Gejza Gore. The developer of the project, Ceskoslovenska energeticka spolocnost (CES), Kosice is fighting back and claims that their counterpart lacks professional arguments. In the meantime it is preparing for area management proceedings. Trebisov is also involved in the discussion and claims that the town planning scheme does not include such a project. The Ministry of Construction has a different opinion. In the opinion of the Ministry the town planning scheme allows a 885-megawatt power plant to be built only a few hundred meters away from housing estates. (author)

  6. Future plans for the design and construction of fast reactor power stations in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kempken, M.; Koehler, M.; Wolff, M.

    1978-01-01

    Some important design features of future fast reactors in the Federal Republic of Germany (FRG) are presented, in particular for the demonstration plant SNR 2 which is to follow the prototype SNR 300, presently under construction in Kalkar. The SNR 2 conceptual design will be based on the SNR 300 design as far as possible. Programmes for the introduction of fast breeder reactor power stations on the part of the governments, the utilities and suppliers are based on broad international co-operation. The FRG is a country which imports a high proportion of its primary energy and it has rather small resources of natural uranium. The natural uranium realistically available to the FRG will allow nuclear energy to play a substantial role in the long-term energy supply only if present uranium utilization based on LWRs is supplemented and replaced by breeder reactor utilization later. To maintain this option, efforts towards the development, design and construction of fast breeder reactors have to be intensively continued in the FRG. The construction of the first large power station with a fast breeder reactor, SNR 2, will, according to present planning, start in the middle of the 80s. Operation can be expected to start at the beginning of the 90s. The present fast breeder programme in the FRG promises to develop reactors, reprocessing and fuel manufacturing plants to such a degree that by the end of this century the introduction of a substantial number of fast reactor power stations will be possible. (author)

  7. Designing a Weather Station

    Science.gov (United States)

    Roman, Harry T.

    2012-01-01

    The collection and analysis of weather data is crucial to the location of alternate energy systems like solar and wind. This article presents a design challenge that gives students a chance to design a weather station to collect data in advance of a large wind turbine installation. Data analysis is a crucial part of any science or engineering…

  8. Bradwell Nuclear Power Station

    International Nuclear Information System (INIS)

    1987-01-01

    When built, the Magnox reactors were expected to have operating lifetimes of 20-25 years. In order to satisfy the licensing authorities of their continued safety, long term safety reviews (LTSRs) are being carried out as the reactors reach 20 years of operation. This is the Nuclear Installations Inspectorate's (NII) summary report on Bradwell nuclear power station. The objectives of the LTSR are stated. A description of the plant is followed by an explanation of the statutory position on licensing. The responsibilities of the Central Electricity Generating Board (CEGB) and the NII are defined. From the examination of the CEGB's LTSR it is concluded that this generally confirms the validity of the existing safety case for present operation. However, some recommendations are made as to work required for reactor operation up to 1992. A summary of the NII findings is presented. This includes the reactor pressure circuit integrity, effects of ageing and in-service wear and radiation doses. (U.K.)

  9. Environment and ecology in the design and construction of a nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Lebreton, J C [Electricite de France, 75 - Paris. Dept. Etudes Generales Programmes-Sites Environnement

    1975-01-01

    The purpose of the studies on the environment of nuclear stations is to reduce changes to the surroundings as much as possible in order not to interfere with ecosystems and consequently impede human activities. A nuclear power station implies heat discharges, radioactive effluent, and wastes and produces a certain sound level and creates aesthetic problems of space occupation. The main questions dealt with are those of heat discharge and noise, together with architectural and aesthetic problems. In the first two cases the intention is to define as accurately as possible the levels reached by the temperature or noise parameter. Where noise is concerned it is enough to know these levels in order to define an eventual hindrance to the target in question, the human being in this case. For heat fluxes man is not directly involved and further research is planned to identify the sensitivity of plants and animals. Since the environment also covers aesthetics, an effort is made to safeguard and improve the quality of the landscape.

  10. Environment and ecology in the design and construction of a nuclear power station

    International Nuclear Information System (INIS)

    Lebreton, J.-C.

    1975-01-01

    The purpose of the studies on the environment of nuclear stations is to reduce changes to the surroundings as much as possible in order not to interfere with ecosystems and consequently impede human activities. A nuclear power station implies heat discharges, radioactive effluent and wastes, produces a certain sound level and creates aesthetic problems of space occupation. The main questions dealt with are those of heat discharge and noise, together with architectural and aesthetic problems. In the first two cases the intention is to define as accurately as possible the levels reached by the temperature or noise parameter. Where noise is concerned it is enough to know these levels in order to define an eventual hindrance to the target in question, the human being in this case. For heat fluxes man is not directly involved and further research is planned to identify the sensitivity of plants and animals. Since the environment also covers aesthetics, an effort is made to safeguard and improve the quality of the landscape [fr

  11. Design and performance of the helically coiled boilers of two AGR power stations in the United Kingdom

    International Nuclear Information System (INIS)

    El-Nagdy, M.; Papa, A.D.

    1988-01-01

    The Hartlepool and Heysham-I AGR stations have been commissioned and operating since 1983. The main features, of the design of the helical once-through boilers raising the steam for power generation, are outlined. The modifications to the feed inlet flow ferrules, necessary to improve the boiler performance and optimize the power output, have been described. Comparisons between the thermal and hydrodynamic performance of the boilers before and following these alterations are given. The improvements in the computer code predictions of the plant performance have also been presented. (author)

  12. Outline of design and construction work related to the installation of freshwater storage tank at Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Ozaki, Mitsuhiro; Yamaguchi, Kazuhide; Suzuki, Takeshi

    2017-01-01

    Tohoku Electric Power Co., Ltd., at its Higashidori Nuclear Power Station, is promoting the installation of safety measure facilities as an effort to restart the operation. It is implementing a freshwater storage tank installation work to secure core cooling function at the time of severe accident occurrence. Construction started in June 2014, drilling and construction of the framework have advanced while paying due attention to quality assurance, and affiliated facilities are currently under construction. This paper reports the outline of planning, design, and construction work of this project. (A.O.)

  13. Power station simulators

    International Nuclear Information System (INIS)

    Zanobetti

    1989-01-01

    The number and the variety of simulators have gown to such an extent that it has become necessary to classify the numerous types now available. Simulators are of paramount importance for the design of nuclear power plants, for optimizing their efficiency and for the training of their operators: factors that contribute to their overall security. This book contains chapters on the following subjects: the development of power plant simulators, the components and classification of simulators, simulator technology, simulator performance and problems in simulator training

  14. Discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report contains details of the technologies used at many nuclear power stations to treat and control radioactive discharges and gives, where information was available, details of discharges and authorised discharge limits. (author)

  15. Structural design of the turbine building of Angra Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Varella, L.N.; Reis, F.J.C.; Jurkiewicz, W.J.

    1978-01-01

    The Turbine Building of the Angra Nuclear Power Plant, Unit 1, and particularly its structure and structural design are described. The Turbine Building, as far as its structure is concerned, deviates from the standard structure of any turbine building due to the fact that huge ducts are provided in the foundation mat as to accomodate the circulating water system. This aspect and the fact that the building is founded upon a very deep strata of compacted and controlled fill, makes out of the building structure 'a concrete ship floating in the sea of sand', and by the same reason presents by itself an interesting structure, worth to be known to all engineers involved in design of power plants. This pape, suplemented by a few slides shown during presentation of the paper at the conference, covers the subject mainly from the designers' point of view. (Author)

  16. Applicability of Long Duration Exposure Facility environmental effects data to the design of Space Station Freedom electrical power system

    Science.gov (United States)

    Christie, Robert J.; Lu, Cheng-Yi; Aronoff, Irene

    1992-01-01

    Data defining space environmental effects on the Long Duration Exposure Facility (LDEF) are examined in terms of the design of the electrical power system (EPS) of the Space Station Freedom (SSF). The significant effects of long-term exposure to space are identified with respect to the performance of the LDEF's materials, components, and systems. A total of 57 experiments were conducted on the LDEF yielding information regarding coatings, thermal systems, electronics, optics, and power systems. The resulting database is analyzed in terms of the specifications of the SSF EPS materials and subsystems and is found to be valuable in the design of control and protection features. Specific applications are listed for findings regarding the thermal environment, atomic oxygen, UV and ionizing radiation, debris, and contamination. The LDEF data are shown to have a considerable number of applications to the design and planning of the SSF and its EPS.

  17. Torness: proposed nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The need for and desirability of nuclear power, and in particular the proposed nuclear power station at Torness in Scotland, are questioned. Questions are asked, and answered, on the following topics: position, appearance and cost of the proposed Torness plant, and whether necessary; present availability of electricity, and forecast of future needs, in Scotland; energy conservation and alternative energy sources; radiation hazards from nuclear power stations (outside, inside, and in case of an accident); transport of spent fuel from Torness to Windscale; radioactive waste management; possibility of terrorists making a bomb with radioactive fuel from a nuclear power station; cost of electricity from nuclear power; how to stop Torness. (U.K.)

  18. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  19. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  20. Design and study of water supply system for supercritical unit boiler in thermal power station

    Science.gov (United States)

    Du, Zenghui

    2018-04-01

    In order to design and optimize the boiler feed water system of supercritical unit, the establishment of a highly accurate controlled object model and its dynamic characteristics are prerequisites for developing a perfect thermal control system. In this paper, the method of mechanism modeling often leads to large systematic errors. Aiming at the information contained in the historical operation data of the boiler typical thermal system, the modern intelligent identification method to establish a high-precision quantitative model is used. This method avoids the difficulties caused by the disturbance experiment modeling for the actual system in the field, and provides a strong reference for the design and optimization of the thermal automation control system in the thermal power plant.

  1. Design and construction features of steam generators at a nuclear power station

    International Nuclear Information System (INIS)

    Chakrabarti, A.K.; Gupta, K.N.; Bapat, C.N.; Sharma, V.K.

    1996-01-01

    The Indian nuclear power programme is based on Pressurised Heavy Water Reactors (PHWRs) using natural uranium as fuel and heavy water as reactor coolant as well as moderator. The nuclear heat is generated in the fuel located in the pressure tubes. Pressurised heavy water in the primary heat transport (PHT) system is circulated through the tubes which picks up the heat from the fuel and transfers it to ordinary water in steam generators (SGs) to produce steam. The steam is used for providing power to the turbine. The steam generator is a critical equipment in the nuclear steam supply system (NSSS) of a nuclear reactor. SG tube surface area constitute about 80% of total primary circuit surface area. A typical value in a 220 MWe reactor is 9000 m 2 which can release considerable amount of corrosion products unless very low corrosion rates are achieved by proper design, material selection and water chemistry control. Design and construction features of SGs are given. 1 tab

  2. Culham Conceptual Tokamak Mark II. Design study of the layout of a twin-reactor fusion power station

    International Nuclear Information System (INIS)

    Guthrie, J.A.S.; Harding, N.H.

    1981-07-01

    This report describes the building layout and outline design for the nuclear complex of a fusion reactor power station incorporating two Culham Conceptual Tokamak Reactors Mk.II. The design incorporates equipment for steam generation, process services for the fusion reactors and all facilities for routine and non-routine servicing of the nuclear complex. The design includes provision of temporary facilities for on site construction of the major reactor components and shows that these facilities may be used for disassembly of the reactors either for major repair and/or decommissioning. Preliminary estimates are included, which indicate the cost benefits to be obtained from incorporating two reactors in one nuclear complex and from increased wall loading. (author)

  3. Aseismatic design of electrical equipments and instruments for nuclear power stations

    International Nuclear Information System (INIS)

    Suzuki, Yasuharu; Nishizawa, Kazuo; Miyazaki, Yoshio; Miura, Takumi

    1977-01-01

    The aseismatic design of electrical instruments is carried out according to IEEE Standard 344-1971 in the USA. In Japan also, the method of aseismatic design of electrical instruments has been investigated by the representatives of electric power companies and electric machine makers since 1972. In Hitachi Ltd., the statical method of confirming aseismatic property was established on the basis of the rigid design for electrical instruments. It is convenient to examine the aseismatic property of electrical equipments by classifying them into control and switch boards, electrical appliances, equipments and circuits. It is possible to use the static method treating earthquake force as static load by avoiding resonance with the electrical equipments which have the higher natural frequency than that of buildings. The purposes of the vibration test are to prove the validity of the theoretical analysis, to clarify the vibration characteristics, and to confirm the maintenance of functions and the strength of the equipments. The vibration tests of control boards, the switch boards of enclosed type, motor control centers, the racks for instrumentation, storage batteries and electrical appliances are explained. Moreover, the vibration analysis with a computer according to finite element method is described. (Kako, I.)

  4. Space Station Engineering Design Issues

    Science.gov (United States)

    Mcruer, Duane T.; Boehm, Barry W.; Debra, Daniel B.; Green, C. Cordell; Henry, Richard C.; Maycock, Paul D.; Mcelroy, John H.; Pierce, Chester M.; Stafford, Thomas P.; Young, Laurence R.

    1989-01-01

    Space Station Freedom topics addressed include: general design issues; issues related to utilization and operations; issues related to systems requirements and design; and management issues relevant to design.

  5. Tokai earthquakes and Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Komura, Hiroo

    1981-01-01

    Kanto district and Shizuoka Prefecture are designated as ''Observation strengthening districts'', where the possibility of earthquake occurrence is high. Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., is at the center of this district. Nuclear power stations are vulnerable to earthquakes, and if damages are caused by earthquakes in nuclear power plants, the most dreadful accidents may occur. The Chubu Electric Power Co. underestimates the possibility and scale of earthquakes and the estimate of damages, and has kept on talking that the rock bed of the power station site is strong, and there is not the fear of accidents. However the actual situation is totally different from this. The description about earthquakes and the rock bed in the application of the installation of No.3 plant was totally rewritten after two years safety examination, and the Ministry of International Trade and Industry approved the application in less than two weeks thereafter. The rock bed is geologically evaluated in this paper, and many doubtful points in the application are pointed out. In addition, there are eight active faults near the power station site. The aseismatic design of the Hamaoka Nuclear Power Station assumes the acceleration up to 400 gal, but it may not be enough. The Hamaoka Nuclear Power Station is intentionally neglected in the estimate of damages in Shizuoka Prefecture. (Kako, I.)

  6. Tritium containment and blanket design challenges for a 1 GWe mirror fusion central power station

    International Nuclear Information System (INIS)

    Galloway, T.R.

    1976-06-01

    Tritium containment and removal problems associated with the blanket and power-systems for a mirror fusion reactor are identified and conceptual process designs are devised to reduce emissions to the environment below 1 Ci/day. The blanket concept development proceeds by starting with this emission goal of 1 Ci/day and working inward to the blanket. At each decision point, worker safety, operational labor costs, and capital cost tradeoffs are contrasted. The conceptual design uses air for the reactor hall with a continuous catalytic oxidizer-molecular sieve adsorber cleanup system to maintain a 40 μCi/m 3 tritium level (5 μCi/m 3 HTO) against 180 Ci/day leakage from reactor components, energy recovery systems, and process piping. This blanket contains submodules with Li 2 Be 2 O 3 --Be for tritium breeding and submodules with Be for mostly energy production. Tritium production in both is handled by separately containing this breeding material and scavenging this container with lithium vapor-doped helium gas stream

  7. Designing and Manufacturing a Noise Controlling Silencer for the Cooling Tower Pump of Sarcheshmeh Copper Power Station

    Directory of Open Access Journals (Sweden)

    Sajad Zare

    2017-08-01

    Full Text Available Background One of the most common harmful factors in the workplace is noise. Noise control is a factor beneficial for health and safety in the workplace. Objectives The current study aimed to design and manufacture a silencer for the cooling tower pump of Sarcheshmeh Copper power station in order to control noise. Methods In this study, sound pressure level was measured by the use of a sound level meter (B & K 2260. Measurement was carried out in the light of ISO 1996 standard. After studying technical and acoustic features of the noise source, a dispersive-absorptive silencer was designed to control noise pollution generated by the cooling tower pump of the thermal station. After analyzing the frequencies of sound pressure level and using available data, a cylindrical silencer (with a diameter of 1.5 m and height of 3 m was designed and manufactured. The internal part of the silencer was filled with different columns of absorbent material covered with punched metal. Therefore, the silencer consisted of (1 acoustic diffuser, (2 acoustic chamber, and (3 acoustic channels. Results Measurements showed that, at a distance of 1 m from the source, sound pressure level reduced from 127 dBA before installing the silencer to 79 dBA after the installation, resulting in a reduction of 48 dBA. Conclusions Using a silencer with absorbent material (glass wool is very effective in reducing the noise generated by the pump.

  8. Services for nuclear power stations

    International Nuclear Information System (INIS)

    Fremann, M.; Ryckelynck

    1987-01-01

    This article gives an information as complete as possible about the activities of the french nuclear industry on the export-market. It describes the equipment and services available in the field of services for nuclear power stations [fr

  9. Solidifying power station resins and sludges

    International Nuclear Information System (INIS)

    Willis, A.S.D.; Haigh, C.P.

    1984-01-01

    Radioactive ion exchange resins and sludges arise at nuclear power stations from various operations associated with effluent treatment and liquid waste management. As the result of an intensive development programme, the Central Electricity Generating Board (CEGB) has designed a process to convert power station resins and sludges into a shielded, packaged solid monolithic form suitable for final disposal. Research and development, the generic CEGB sludge/resin conditioning plant and the CEGB Active Waste Project are described. (U.K.)

  10. COMBINED CYCLE GAS TURBINE FOR THERMAL POWER STATIONS: EXPERIENCE IN DESIGNING AND OPERATION, PROSPECTS IN APPLICATION

    Directory of Open Access Journals (Sweden)

    N. V. Karnitsky

    2014-01-01

    Full Text Available The paper has reviewed main world tendencies in power consumption and power system structure. Main schemes of combined cycle gas turbines have been considered in the paper. The paper contains an operational analysis of CCGT blocks that are operating within the Belarusian energy system. The analysis results have been given in tables showing main operational indices of power blocks

  11. Control structures design for fossil power station units; Diseno de estructuras de control para unidades termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Palomares Gonzalez, Daniel; Ricano Castillo, Juan Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1990-12-31

    In this paper are designed an analyzed the control ties of a 300MW fossil unit at different operation levels. The design and analysis were developed on an operation range of 50% to 100% load. The main control ties were studied among which are the feedwater flow, the superheating zone temperatures and the generated output. The technique used for the design is the decomposition in singular values (DSV) of the plant transference matrix. This is a recent technique that permits finding the most important interactions among output-input variables, over a significative frequencies range for the transference matrix of the plant. For this purpose utilizes the control properties of the transference matrix, such as: control effort, output-input interaction and ruggedness with respect to uncertainties. The control structures obtained were tested in a digital model of a fossil plant unit. A comparison study of both structures (original and modified) showed enhancement in the performance of the power plant with modified structure. [Espanol] En este trabajo se disenan y analizan los lazos de control de una unidad termoelectrica de 300 MW, a diferentes niveles de operacion. El diseno y analisis se desarrollo sobre un rango de operacion de 50 a 100 por ciento de carga. Se estudiaron los principales lazos de control entre los que se encuentran el flujo de agua de alimentacion, las temperaturas de la zona de sobrecalentamiento y la potencia generada. La tecnica utilizada para el diseno es la descomposicion en valores singulares (DVS) de la matriz de transferencia de la planta. Esta es una tecnica reciente que permite encontrar las interacciones mas importantes entre variables entrada-salida, sobre un rango de frecuencias significativas para la matriz de transferencia de la planta. Utiliza para ello las propiedades de control de la matriz de transferencia, como son: esfuerzo de control, interaccion entrada-salida y robustez con respecto a incertidumbres. Las estructuras de control

  12. Control structures design for fossil power station units; Diseno de estructuras de control para unidades termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Palomares Gonzalez, Daniel; Ricano Castillo, Juan Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1989-12-31

    In this paper are designed an analyzed the control ties of a 300MW fossil unit at different operation levels. The design and analysis were developed on an operation range of 50% to 100% load. The main control ties were studied among which are the feedwater flow, the superheating zone temperatures and the generated output. The technique used for the design is the decomposition in singular values (DSV) of the plant transference matrix. This is a recent technique that permits finding the most important interactions among output-input variables, over a significative frequencies range for the transference matrix of the plant. For this purpose utilizes the control properties of the transference matrix, such as: control effort, output-input interaction and ruggedness with respect to uncertainties. The control structures obtained were tested in a digital model of a fossil plant unit. A comparison study of both structures (original and modified) showed enhancement in the performance of the power plant with modified structure. [Espanol] En este trabajo se disenan y analizan los lazos de control de una unidad termoelectrica de 300 MW, a diferentes niveles de operacion. El diseno y analisis se desarrollo sobre un rango de operacion de 50 a 100 por ciento de carga. Se estudiaron los principales lazos de control entre los que se encuentran el flujo de agua de alimentacion, las temperaturas de la zona de sobrecalentamiento y la potencia generada. La tecnica utilizada para el diseno es la descomposicion en valores singulares (DVS) de la matriz de transferencia de la planta. Esta es una tecnica reciente que permite encontrar las interacciones mas importantes entre variables entrada-salida, sobre un rango de frecuencias significativas para la matriz de transferencia de la planta. Utiliza para ello las propiedades de control de la matriz de transferencia, como son: esfuerzo de control, interaccion entrada-salida y robustez con respecto a incertidumbres. Las estructuras de control

  13. Balakovo nuclear power station

    International Nuclear Information System (INIS)

    1996-01-01

    A key means of improving the safety and reliability of nuclear power plants is through effective training of plant personnel. The goal of this paper is to show the progress of the training at the Balakovo Nuclear Power Plant, and the important role that international cooperation programs have played in that progress

  14. Extension of life of nuclear power stations

    International Nuclear Information System (INIS)

    Takahashi, Hideaki

    1991-01-01

    At the time of designing nuclear power stations, as their service life, generally 40 years are taken, and the basic design specifications of machinery and equipment are determined. In USA where atomic energy has been developed, the new construction of nuclear power stations is cased for a while, however, if this situation continues as it is, since old power stations reach the service life of 40 years and are retired in near future, it is feared that the circumstance of the total amount of power generation becoming short will occur. As one of the countermeasures to this, the research on the extension of life of nuclear power stations has been carried out in many fields in USA, and it is expected that the application for extending the life for the power stations constructed in the initial period of development is submitted in 1991. The researches that have been carried out for solving the technical problems in this extension of life and the situation in Japan are reported. The NEC of USA decided that the operation period of nuclear power stations in USA, which is considered to be 40 years so far, can be extended up to the limit of 20 years. The background and circumstances of this problem in USA, Nuclear Plant Aging Research Program, Plant Life Extension Program and so on are reported. (K.I.)

  15. Design and construction work of underground pit for existing light oil tank foundation at Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kikuchi, Keita; Date, Masanao; Horimi, Shingo

    2017-01-01

    Based on the new regulatory standards for commercial power plant reactors enforced in July 2013, Onagawa Nuclear Power Station of Tohoku Electric Power Co., Inc. implemented various safety measure works. One of them was a measure for the existing light oil tank foundation for emergency diesel generators for Unit 2 reactor. In consideration of tornado, external fire, and earthquake resistance, the company implemented the underground pit construction for a light oil tank basement by utilizing the existing oil retaining wall and foundation. This paper reported the outline of the planning, design, and implementation of construction works, which were carried out while securing quality and safety. Upon installation of the underground pit, the company utilized the existing oil retaining wall from the viewpoint of reducing construction costs, shortening time schedule, and reducing environmental burden. As a result of checking bending and axial force, part of these values exceeded the design reference values. So, 3-dimensional shell model was applied, and the simulation results showed sufficient seismic margin. As a measure to secure seismic margin against shear force, Ceramic-Cap-bar construction method was adopted. Upon construction, the company adopted the water jet method, and devised the sequential order of construction. In parallel with the day and night work and tank installation, it constructed the top slab, which secured the time schedule and quality. (A.O.)

  16. Proceedings of the workshop on future control station designs and human performance issues in nuclear power plants

    International Nuclear Information System (INIS)

    2007-01-01

    The nuclear community is currently at a stage where new reactors are being built, advanced reactors are being planned, and existing reactors are undergoing various forms of modernization of their control stations. Nuclear power plants are characterised by a high degree of complexity, where efficient and safe performance is dependent on both a sound technical design and effective teamwork and work practices. Team interactions have long traditions in current nuclear power plants. The way people operate and maintain the plants may need to accommodate technical advances associated with control station modernization and advanced plant control stations. The nuclear community likely to see the introduction of new designs, new tools to support the staff, changes to staffing types and levels, concepts of operation for new reactors that are different from current reactors, e.g., multi-unit control, possible remote operation, distributed decision making, and cooperation across distances. Based on recent experience, there is limited knowledge about human performance issues with regard to upgraded control rooms. However, even less knowledge exists regarding operation and maintenance of control stations for future and more advanced reactor designs. In order to explore these issues, the CSNI Special Experts' Group on Human and Organisational Factors (SEGHOF), now the Working Group on Human and Organizational Factors (WGHOF), and the Halden Reactor Project (HRP) hosted a joint workshop which provided an international forum for utilities, vendors, research bodies and regulators to discuss human performance issues related to control stations for future nuclear power plant designs and for modified control rooms for existing plants. The Norwegian petroleum industry also shared their experiences, especially with integrated and distributed operations among off-shore and on-shore control centres. There were 74 participants from 20 countries at the workshop. Twenty-two papers were

  17. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  18. Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report

    International Nuclear Information System (INIS)

    Peterson, L.R.; Preston-Smith, J.; Savage, J.W.; Rousseau, W.F.

    1981-01-01

    A human factors engineering preliminary design review of the Shoreham control room was performed at the site on March 30 through April 3, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The presented sections are numbered to conform to the guidelines of the draft version of NUREG-0700. They summarize the teams's observations of the control room design and layout, and of the control room operators' interface with the control room environment

  19. [Hygienic problems in the location of modern wind electric power stations in their design].

    Science.gov (United States)

    Kireeva, I S; Makhniuk, V M; Akimenko, V Ia; Dumanskiĭ, Iu D; Semashko, P V

    2013-01-01

    Hygienic aspects of the placement of wind power plants (WPP) in connection with the intensive development of wind power and the lack of systematic information on their effects of the environment and living conditions of the population are becoming more actual. In the article there are considered results of the sanitary-epidemiological expertise of the construction project of three modern large wind farm (the South - Ukrainian, Tiligulskaya and Pokrovskaya) with a total capacity offrom 180 to 500 MW of wind farms with 2.3 MW power generators of wind turbines. It is shown that in the process of wind farm construction a contamination of the environment (air soil, ground water) may take place due to the working of construction equipment and vehicle, excavation, welding and other operations, in the exploitation of wind farm there can be created elevated levels of acoustic and electromagnetic pollution in the neighborhood and emergencies with the destruction of WPP in adverse weather conditions. Based on the calculations presented in the projects, and the analysis of data on the impact offoreign windfarm on the environment it was found that the limiting factor of the influence is the wind farm noise pollution in the audio frequency range that extends beyond the territory of wind fields, electromagnetic radiation is recorded within the hygienic standards and below only in the immediate vicinity of its sources (electrical equipment and power lines). For considered modern wind farms there was grounded sanitary protective zone with dimensions of 700 mfrom the outermost wind turbines by the noise and it was recommended compliance distance of200 mfrom the wind turbine to limit any activity and people staying in times of possible emergency situations in adverse weather conditions.

  20. Space Station power system issues

    International Nuclear Information System (INIS)

    Giudici, R.J.

    1985-01-01

    Issues governing the selection of power systems for long-term manned Space Stations intended solely for earth orbital missions are covered briefly, drawing on trade study results from both in-house and contracted studies that have been conducted over nearly two decades. An involvement, from the Program Development Office at MSFC, with current Space Station concepts began in late 1982 with the NASA-wide Systems Definition Working Group and continued throughout 1984 in support of various planning activities. The premise for this discussion is that, within the confines of the current Space Station concept, there is good reason to consider photovoltaic power systems to be a venerable technology option for both the initial 75 kW and 300 kW (or much greater) growth stations. The issue of large physical size required by photovoltaic power systems is presented considering mass, atmospheric drag, launch packaging and power transmission voltage as being possible practicality limitations. The validity of searching for a cross-over point necessitating the introduction of solar thermal or nuclear power system options as enabling technologies is considered with reference to programs ranging from the 4.8 kW Skylab to the 9.5 gW Space Power Satellite

  1. IEEE standard requirements for reliability analysis in the design and operation of safety systems for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The purpose of this standard is to provide uniform, minimum acceptable requirements for the performance of reliability analyses for safety-related systems found in nuclear-power generating stations, but not to define the need for an analysis. The need for reliability analysis has been identified in other standards which expand the requirements of regulations (e.g., IEEE Std 379-1972 (ANSI N41.2-1972), ''Guide for the Application of the Single-Failure Criterion to Nuclear Power Generating Station Protection System,'' which describes the application of the single-failure criterion). IEEE Std 352-1975, ''Guide for General Principles of Reliability Analysis of Nuclear Power Generating Station Protection Systems,'' provides guidance in the application and use of reliability techniques referred to in this standard

  2. Aseismic foundation system for nuclear power stations

    International Nuclear Information System (INIS)

    Jolivet, F.; Richli, M.

    1977-01-01

    The aseismic foundation system, as described in this paper, is a new development, which makes it possible to build standard nuclear power stations in areas exposed to strong earthquakes. By adopting proven engineering concepts in design and construction of components, great advantages are achieved in the following areas: safety and reliability; efficiency; design schedule; cost. The need for an aseismic foundation system will arise more and more, as a large part of nuclear power station sites are located in highly seismic zones or must meet high intensity earthquake criteria due to the lack of historic data. (Auth.)

  3. Design of the system of maintenance operations occupational safety and health database application of nuclear power station

    International Nuclear Information System (INIS)

    Wang Xuehong; Li Xiangyang; Ye Yongjun

    2011-01-01

    Based on the KKS code of building equipment in nuclear power station, this paper introduces the method of establishing the system of maintenance operation occupational safety and health database application. Through the application system of maintenance occupational safety and health database, it can summarize systematically all kinds of maintenance operation dangerous factor of nuclear power station, and make a convenience for staff to learn the maintenance operation dangerous factors and the prevention measures, so that it can achieve the management concept of 'precaution crucial, continuous improvement' that advocated by OSHMS. (authors)

  4. Simulations of the design basis accident at conditions of power increase and the o transient of MSIV at overpressure conditions of the Laguna Verde Power Station

    International Nuclear Information System (INIS)

    Araiza M, E.; Nunez C, A.

    2001-01-01

    This document presents the analysis of the simulation of the loss of coolant accident at uprate power conditions, that is 2027 MWt (105% of the current rated power of 1931MWt). This power was reached allowing an increase in the turbine steam flow rate without changing the steam dome pressure value at its rated conditions (1020 psiaJ. There are also presented the results of the simulation of the main steam isolation va/ve transient at overpressure conditions 1065 psia and 1067 MWt), for Laguna Verde Nuclear Power Station. Both simulations were performed with the best estimate computer code TRA C BF1. The results obtained in the loss of coolant accident show that the emergency core coolant systems can recover the water level in the core before fuel temperature increases excessively, and that the peak pressure reached in the drywell is always below its design pressure. Therefore it is concluded that the integrity of the containment is not challenged during a loss of coolant accident at uprate power conditions.The analysis of the main steam isolation valve transients at overpressure conditions, and the analysis of the particular cases of the failure of one to six safety relief valves to open, show that the vessel peak pressures are below the design pressure and have no significant effect on vessel integrity. (Author)

  5. 1100 MW BWR power station

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Now, the start-up test of No. 2 plant in Fukushima No. 2 Nuclear Power Station is smoothly in progress, and the start of its commercial operation is scheduled at the beginning of 1984. Here, the main features of No. 2 plant including piping design are explained. For No. 2 plant, many improving measures were adopted as the base plant of the improvement and standardization project of the Ministry of International Trade and Industry, such as the adoption of Mark-2 improved PCV, the adoption of an intermediate loop in the auxiliary cooling system, one-body forging of the lower end cover of the reactor pressure vessel, the adoption of many curved pipes, the adoption of large one-body structural components in reactor recirculation system piping and so on, which are related to the reduction of radiation exposure and the improvement of plant reliability in operation and regular inspection. Also, in order to do general adjustment in the arrangement of equipment and piping and in route design, and to establish the rational construction work plan, model engineering was adopted. In No. 2 plant, a remote-controlled automatic and semiautomatic ultrasonic flaw detection system was adopted to reduce radiation exposure in in-service inspection. Automatic welding was adopted to improve the quality. (Kako, I.)

  6. Monitoring of nuclear power stations

    International Nuclear Information System (INIS)

    Ull, E.; Labudda, H.J.

    1987-01-01

    The purpose of the invention is to create a process for undelayed automated detection and monitoring of accidents in the operation of nuclear power stations. According to the invention, this problem is solved by the relevant local measurements, such as radiation dose, components and type of radiation and additional relevant meteorological parameters being collected by means of wellknown data collection platforms, these being transmitted via transmission channels by means of satellites to suitable worldwide situated receiving stations on the ground, being processed there and being evaluated to recognise accidents. The local data collection platforms are used in the immediate vicinity of the nuclear power station. The use of aircraft, ships and balloons as data collection systems is also intended. (HWJ)

  7. Design, construction and operating experience of boilers at Wylfa power station

    Energy Technology Data Exchange (ETDEWEB)

    Razzell, R N [Wylfa Power Station, Central Electricity Generating Board, Gwynedd (United Kingdom)

    1988-07-01

    The report will describe the boilers, but will emphasise the problems encountered and the solutions. The boilers are 'once through' with start up drums. Some redundancy was provided but this advantage was lost due to downrating of gas temperature. The boilers are carbon steel suspended plattens (992 per reactor) tightly packed in the annular space between the core shielding and the spherical wall of the pressure vessel. This construction denies access to repair tube leaks. when a leak occurs the faulty platten has to be plugged off. This is done with the reactor at 60% power. The process will be described. Reactor 1 commenced operation in 1971, Reactor 2 in June 1971. Between 1972 and May 1984 21 leaks occurred which resulted in a major shutdown for investigation. This revealed the leaks were caused by gas flow induced vibration resulting in fretting of tubes in clips. Restraints and additional clamps were fitted. This has been successful but the modifications were extensive and in very difficult working conditions, the Reactor being shut down until May 1976. A family of leaks adjacent to personnel access ways commenced in Reactor 1 in 1975 which was later identified as erosion/corrosion on the water/steam side caused by the feed flow instability. This problem is common to both Reactors. Various modifications have been applied. Redistribution of feed flow using orifice plates and ferrules was only temporarily successful. Following extensive rig testing the feed water has been dosed with amino methyl proponal (AMP) since September 1983 with an immediate and sustained reduction in the leak rate. The amine provides protection through the steam/water phase. Rig testing continues to attain a better understanding of the erosion/corrosion. (author)

  8. Design, construction and operating experience of boilers at Wylfa power station

    International Nuclear Information System (INIS)

    Razzell, R.N.

    1988-01-01

    The report will describe the boilers, but will emphasise the problems encountered and the solutions. The boilers are 'once through' with start up drums. Some redundancy was provided but this advantage was lost due to downrating of gas temperature. The boilers are carbon steel suspended plattens (992 per reactor) tightly packed in the annular space between the core shielding and the spherical wall of the pressure vessel. This construction denies access to repair tube leaks. when a leak occurs the faulty platten has to be plugged off. This is done with the reactor at 60% power. The process will be described. Reactor 1 commenced operation in 1971, Reactor 2 in June 1971. Between 1972 and May 1984 21 leaks occurred which resulted in a major shutdown for investigation. This revealed the leaks were caused by gas flow induced vibration resulting in fretting of tubes in clips. Restraints and additional clamps were fitted. This has been successful but the modifications were extensive and in very difficult working conditions, the Reactor being shut down until May 1976. A family of leaks adjacent to personnel access ways commenced in Reactor 1 in 1975 which was later identified as erosion/corrosion on the water/steam side caused by the feed flow instability. This problem is common to both Reactors. Various modifications have been applied. Redistribution of feed flow using orifice plates and ferrules was only temporarily successful. Following extensive rig testing the feed water has been dosed with amino methyl proponal (AMP) since September 1983 with an immediate and sustained reduction in the leak rate. The amine provides protection through the steam/water phase. Rig testing continues to attain a better understanding of the erosion/corrosion. (author)

  9. Merchant funding for power stations

    International Nuclear Information System (INIS)

    Johnston, B.; Bartlam, M.

    1997-01-01

    The next frontier for project finance is merchant generation: the financing of IPPs without long-term offtake contracts. Banks are just beginning to finance merchant generation power stations. One of the first was Destec's Indian Queens project in Cornwall, UK. Bruce Johnston and Martin Bartlam of Wilde Sapte discuss the project. (UK)

  10. CNG Fuelling Stations Design Philosophy

    International Nuclear Information System (INIS)

    Radwan, H.

    2004-01-01

    I. Overview (a) Compressed Natural Gas - CNG:- Natural Gas, as an alternative fuel for vehicles, is supplied from the Natural Gas Distribution Network to the CNG fuelling stations to be compressed to 250 bars. It is then dispensed, to be stored on board of the vehicle at about 200 bars in a cylinder installed in the rear, under carriage, or on top of the vehicle. When the Natural Gas is required by the engine, it leaves the cylinder traveling through a high pressure pipe to a high pressure regulator, where the pressure is reduced close to atmospheric pressure, through a specially designed mixer, where it is properly mixed with air. The mixture then flows into the engine's combustion chamber, and is ignited to create the power required to drive the vehicle. (b) CNG Fuelling Stations General Description: as Supply and Metering The incoming gas supply and metering installation primarily depend on the pressure and flow demands of the gas compressor. Natural Gas Compressor In general, gas compressors for natural gas filling stations have relatively low flow rates

  11. Design, analysis and construction of the prestressed concrete containment of the nuclear power station Gundremmingen

    International Nuclear Information System (INIS)

    Mueller, W.F.; Ick, U.

    1977-01-01

    Kraftwerk Union AG is presently constructing at Gundremmingen (Bavaria) on the River Danube a BWR twin-plant (KRB Units B and C) with a capacity of 2x1300 MWe. Owing to the wall thickness/diameter ratio the containment can be calculated as a thin-walled shell. Areas of discontinuity are subjected to three-dimensional investigations. For the design of the concrete structure different fracture safety margins are defined for the load conditions occurring in operation in the event of a loss-of-coolant accident and as a result of an aircraft or an earthquake. From this results that in the cross sectional areas without discontinuities of the prestressed outer cylinder no resultant tensions occur. For the steel liner different limits of strain are permitted for the various load conditions, bearing in mind that the integrity of the liner must remain ensured at any time. In order to keep the stresses resulting from the constraint of the containment outer cylinder in the foundation slab low, the cylindrical wall is placed on bearings. The suppression pool top slab is constrained at the containment outer cylinder and at the containment inner cylindrical wall. The inlets of the vent pipes are integrated in the slab in a way resulting in a double slab. The liner consists of 8 mm thick steel plate and is anchored in the concrete via steel sections. Mechanical equipment anchoring in the concrete is provided by welding anchor plates into the liner after the section concerned has been completed. The carcass work on the reactor building is scheduled to be completed within

  12. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  13. Impact studies and nuclear power stations

    International Nuclear Information System (INIS)

    Chambolle, Thierry

    1981-01-01

    Impact studies form an essential part of environmental protection. The impact study discipline has enabled the EDF to have a better understanding of the effects of nuclear power stations on the environment and to remedy them at the project design stage [fr

  14. Nuclear power station achievement 1968-1980

    International Nuclear Information System (INIS)

    Howles, L.R.

    This report reviews and gives an analysis of the achievement of operating nuclear power stations in the Western world on three relevant bases: (1) both annual and cumulative achievement of all nuclear power stations at a particular time; (2) cumulative achievement of all nuclear power stations at the end of the first and subsequent years of their lives to show trends with age; (3) achievement based on refuelling period considerations. Nowhere in the report are any operating details ignored, omitted or eliminated in the method of analysis. Summarising the results of the reviews shows: an improvement with time from initial electricity generation on all bases; that initially, larger sizes of reactor/turbine operate less well than smaller sizes (except for PHWR's); that after an initial number of years, the largest size units operate as well as the intermediate and smaller sizes, or better in the PHWR case; that a 75 per cent cumulative load factor achievement in the middle years of a reactor/turbines life can be expected on the refuelling period considerations base; that at June 1980, 35 nuclear power stations achieved an annual load factor over 75 per cent; that the above achievement was possible despite the repercussions following the Three Mile Island 'accident' and the shutdowns in the USA for piping system seismic adequacy checks required by the Nuclear Regulatory Commission for five nuclear power stations; and that even when reactors/turbines are reaching towards the end of their design life, there is no rapid deterioration in their achievements. (author)

  15. Safety aspects of nuclear power stations

    International Nuclear Information System (INIS)

    Binner, W.

    1980-01-01

    Psychological aspects of the fear of nuclear power are discussed, cancer deaths due to a nuclear accident are predicted and the need for nuclear accident prevention is stressed. A simplified analysis of the safety precautions in a generalised nuclear power station is offered, with reference to loss-of-coolant incidents, and developments in reactor design for fail-safe modes are explained. The importance of learning from the Three Mile Island incident is noted and failure statistics are presented. Tasks to be undertaken at the Austrian Zwentendorf nuclear power station are listed, including improved quality control and acoustic detectors. Precautions against earthquakes are also discussed and it is stated that safe operation of the Zwentendorf station will be achieved. (G.M.E.)

  16. Decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Gregory, A.R.

    1988-01-01

    In the United Kingdom the Electricity Boards, the United Kingdom Atomic Energy Authority (UKAEA) and BNFL cooperate on all matters relating to the decommissioning of nuclear plant. The Central Electricity Generating Board's (CEGB) policy endorses the continuing need for nuclear power, the principle of reusing existing sites where possible and the building up of sufficient funds during the operating life of a nuclear power station to meet the cost of its complete clearance in the future. The safety of the plant is the responsibility of the licensee even in the decommissioning phase. The CEGB has carried out decommissioning studies on Magnox stations in general and Bradwell and Berkeley in particular. It has also been involved in the UKAEA Windscale AGR decommissioning programme. The options as to which stage to decommission to are considered. Methods, costs and waste management are also considered. (U.K.)

  17. 20 years of power station master training

    International Nuclear Information System (INIS)

    Schwarz, O.

    1977-01-01

    In the early fifties, the VGB working group 'Power station master training' elaborated plans for systematic and uniform training of power station operating personnel. In 1957, the first power station master course was held. In the meantime, 1.720 power station masters are in possession of a master's certificate of a chamber of commerce and trade. Furthermore, 53 power station masters have recently obtained in courses of the 'Kraftwerksschule e.V.' the know-how which enables them to also carry out their duty as a master in nuclear power stations. (orig.) [de

  18. Operating experience at Scottish Nuclear's power stations

    International Nuclear Information System (INIS)

    Blackburn, P.

    1991-01-01

    A brief history is presented of the design and operation of the four Scottish nuclear power stations currently run by Scottish Nuclear, namely Hunterston 'A' and 'B' and the Torness reactors. A design flaw in the Magnox reactor at Hunterston 'A' led to it being operated at lower than optimal temperature and hence producing less power. For Hunterston 'B' reactor the Advanced Gas Cooled design prototype was used. Operating setbacks and successes are noted. The design chosen for Torness embraced all the good points of Hunterston 'B' but sought to eliminate its faults. After 26 years of successful operation Hunterston 'A' is now being decommissioned, while the other three stations continue to generate electricity successfully. (UK)

  19. Plant computer system in nuclear power station

    International Nuclear Information System (INIS)

    Kato, Shinji; Fukuchi, Hiroshi

    1991-01-01

    In nuclear power stations, centrally concentrated monitoring system has been adopted, and in central control rooms, large quantity of information and operational equipments concentrate, therefore, those become the important place of communication between plants and operators. Further recently, due to the increase of the unit capacity, the strengthening of safety, the problems of man-machine interface and so on, it has become important to concentrate information, to automate machinery and equipment and to simplify them for improving the operational environment, reliability and so on. On the relation of nuclear power stations and computer system, to which attention has been paid recently as the man-machine interface, the example in Tsuruga Power Station, Japan Atomic Power Co. is shown. No.2 plant in the Tsuruga Power Station is a PWR plant with 1160 MWe output, which is a home built standardized plant, accordingly the computer system adopted here is explained. The fundamental concept of the central control board, the process computer system, the design policy, basic system configuration, reliability and maintenance, CRT display, and the computer system for No.1 BWR 357 MW plant are reported. (K.I.)

  20. Design of an off-grid hybrid PV/wind power system for remote mobile base station: A case study

    Directory of Open Access Journals (Sweden)

    Mulualem T. Yeshalem

    2017-01-01

    Full Text Available There is a clear challenge to provide reliable cellular mobile service at remote locations where a reliable power supply is not available. So, the existing Mobile towers or Base Transceiver Station (BTSs uses a conventional diesel generator with backup battery banks. This paper presents the solution to utilizing a hybrid of photovoltaic (PV solar and wind power system with a backup battery bank to provide feasibility and reliable electric power for a specific remote mobile base station located at west arise, Oromia. All the necessary modeling, simulation, and techno-economic evaluation are carried out using Hybrid Optimization Model for Electric Renewable (HOMER software. The best optimal system configurations namely PV/Battery and PV/Wind/Battery hybrid systems are compared with the conventional stand-alone diesel generator (DG system. Findings indicated that PV array and battery is the most economically viable option with the total net present cost (NPC of $\\$$57,508 and per unit cost of electricity (COE of $\\$$0.355. Simulation results show that the hybrid energy systems can minimize the power generation cost significantly and can decrease CO2 emissions as compared to the traditional diesel generator only. The sensitivity analysis is also carried out to analysis the effects of probable variation in solar radiation, wind speed, diesel price and average annual energy usage of the system load in the optimal system configurations.

  1. Toluene stability Space Station Rankine power system

    Science.gov (United States)

    Havens, V. N.; Ragaller, D. R.; Sibert, L.; Miller, D.

    1987-01-01

    A dynamic test loop is designed to evaluate the thermal stability of an organic Rankine cycle working fluid, toluene, for potential application to the Space Station power conversion unit. Samples of the noncondensible gases and the liquid toluene were taken periodically during the 3410 hour test at 750 F peak temperature. The results obtained from the toluene stability loop verify that toluene degradation will not lead to a loss of performance over the 30-year Space Station mission life requirement. The identity of the degradation products and the low rates of formation were as expected from toluene capsule test data.

  2. Plant diagnostics in power stations

    International Nuclear Information System (INIS)

    Sturm, A.; Doering, D.

    1985-01-01

    The method of noise diagnostics is dealt with as a part of plant diagnostics in nuclear power stations. The following special applications are presented: (1) The modular noise diagnostics system is used for monitoring primary coolant circuits and detecting abnormal processes due to mechanical vibrations, loose parts or leaks. (2) The diagnostics of machines and plants with antifriction bearings is based on bearing vibration measurements. (3) The measurement of the friction moment by means of acoustic emission analysis is used for evaluating the operational state of slide bearings

  3. Local society and nuclear power stations

    International Nuclear Information System (INIS)

    1984-02-01

    This report was made by the expert committee on region investigation, Japan Atomic Industrial Forum Inc., in fiscal years 1981 and 1982 in order to grasp the social economic influence exerted on regions by the location of nuclear power stations and the actual state of the change due to it, and to search for the way the promotion of local community should be. The influence and the effect were measured in the regions around the Fukushima No. 1 Nuclear Power Station of Tokyo Electric Power Co., Inc., the Mihama Power Station of Kansai Electric Power Co., Inc., and the Genkai Nuclear Power Station of Kyushu Electric Power Co., Inc. The fundamental recognition in this discussion, the policy of locating nuclear power stations and the management of regions, the viewpoint and way of thinking in the investigation of the regions where nuclear power stations are located, the actual state of social economic impact due to the location of nuclear power stations, the connected mechanism accompanying the location of nuclear power stations, and the location of nuclear power stations and the acceleration of planning for regional promotion are reported. In order to economically generate electric power, the rationalization in the location of nuclear power stations is necessary, and the concrete concept of building up local community must be decided. (Kako, I.)

  4. Training of power station staff

    International Nuclear Information System (INIS)

    Dusserre, J.

    1993-01-01

    ELECTRICITE DE FRANCE currently operates 51 generating stations with 900 and 1300 MW Pressurized Water Reactors while, only 15 years ago, France possessed only a very small number of such stations. It was therefore vital to set up a major training organization to produce staff capable of starting, controlling and maintaining these facilities with a constant eye to improving quality and safety. Operator and maintenance staff training is based on highly-structured training plans designed to match both the post to be filled and the qualifications possessed by the person who is to fill it. It was essential to set up suitable high-performance training resources to handle this fast growth in staff. These resources are constantly being developed and allow EDF to make steady progress in a large number of areas, varying from the effects of human factors to the procedures to be followed during an accident

  5. Lunar base thermoelectric power station study

    Science.gov (United States)

    Determan, William; Frye, Patrick; Mondt, Jack; Fleurial, Jean-Pierre; Johnson, Ken; Stapfer, G.; Brooks, Michael D.; Heshmatpour, Ben

    2006-01-01

    Under NASA's Project Prometheus, the Nuclear Systems Program, the Jet Propulsion Laboratory, Pratt & Whitney Rocketdyne, and Teledyne Energy Systems have teamed with a number of universities, under the Segmented Thermoelectric Multicouple Converter (STMC) program, to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing and the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as the lunar base power station where kilowatts of power are required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this mission. Previous lunar lander concepts had proposed the use of lunar regolith as in-situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept, we will examine the benefits and requirements for a hermetically-sealed reactor thermoelectric power station module suspended within a man-made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station, at its 100-m exclusion zone radius, were evaluated and found to be acceptable. Site preparation activities are reviewed and well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology

  6. Analyses of occupational radiation exposure received at Gundremmingen nuclear power station, and its implications on the design of current and future power plants

    International Nuclear Information System (INIS)

    Eickelpasch, N.; Pfeiffer, K.W.; Peter, H.

    1977-01-01

    In 1976, the 250 MW Gundremmingen nuclear power station (KRB) completed its first decade of operation. The accumulated activity built-up due to corrosion products in the primary system, the condition of the plant and the methods of radiation work management determine the occupational exposure. The development and the general features of these three parameters are presented in detail. Job related exposure accounting has proven to be an effective means of radiation management. By this means up to 90% of the total radiation exposure could be traced with an accuracy of about 10 mrem. It is shown that up to 40% of the total exposure originate not from primary work but from associating jobs, e.g. work area preparation and testing efforts. Especially in this field a remarkable reduction of the occupational dose rate can be achieved by precise planning. The ten-year radiation protection history of KRB served as a design basis with the objective to reduce occupational radiation exposure. Examples are given how this influenced not only the design of relevant systems but also their accomodation, arrangement and shielding with regard to maintenance and repair work during reactor outage. Physical separation of the components and valves from the associated actuators, controls and instruments was provided to reduce personnel radiation exposure during plant operation. Provisions were also made to avoid contamination of the building atmosphere and to reduce the release of radioactivity via the ventilation systems

  7. Insurance of nuclear power stations

    International Nuclear Information System (INIS)

    Debaets, M.

    1992-01-01

    Electrical utility companies have invested large sums in the establishment of nuclear facilities. For this reason it is normal for these companies to attempt to protect their investments as much as possible. One of the methods of protection is recourse to insurance. For a variety of reasons traditional insurance markets are unable to function normally for a number of reasons including, the insufficient number of risks, an absence of meaningful accident statistics, the enormous sums involved and a lack of familiarity with nuclear risks on the part of insurers, resulting in a reluctance or even refusal to accept such risks. Insurers have, in response to requests for coverage from nuclear power station operators, established an alternative system of coverage - insurance through a system of insurance pools. Insurers in every country unite in a pool, providing a net capacity for every risk which is a capacity covered by their own funds, and consequently without reinsurance. All pools exchange capacity. The inconvenience of this system, for the operators in particular, is that it involves a monopolistic system in which there are consequently few possibilities for the negotiation of premiums and conditions of coverage. The system does not permit the establishment of reserves which could, over time, reduce the need for insurance on the part of nuclear power station operators. Thus the cost of nuclear insurance remains high. Alternatives to the poor system of insurance are explored in this article. (author)

  8. Technological development of Guangdong nuclear power station

    International Nuclear Information System (INIS)

    Huang Shiqiang

    2000-01-01

    After over 5 years of operations, the Guangdong Nuclear Power Station (GNPS) has achieved good results both economically and in operational safety performance. The main attributes to the success of the plant operational performances include the equipment reliability, the technical capability and management efficiency. To that the key strategy has been to adopt know-how and technological transfer and encourage self-innovation, aiming to strive for the long-term self-reliance in design, manufacturing and operating the plant. (author)

  9. Technical evaluation of the proposed design modifications and technical specification changes on grid voltage degradation (Part A) for the Pilgrim Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    White, R.L.

    1980-01-01

    This report documents the technical evaluation of the proposed design modifications and Technical Specification changes for protection of Class 1E equipment from grid voltage degradation for the Pilgrim Nuclear Power Station. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation compares the submittals made by the licensee with the NRC staff positions and the review criteria and presents the reviewer's conclusion on the acceptability of the proposed system

  10. Technical Design Report, Second Target Station

    International Nuclear Information System (INIS)

    Galambos, John D.; Anderson, David E.; Bethea, Katie L.; Carden, W. F.; Chae, Steven M.; Bechtol, D.; Brown, N.; Clark, A.

    2015-01-01

    The Second Target Station (STS) is a proposed upgrade for SNS. It includes a doubling of the accelerator power and an additional instrument hall. The new instrument hall will receive a 467 kW 10 Hz beam. The parameters and preliminary design aspects of the STS are presented for the accelerator, target systems, instrument hall, instruments and civil construction aspects.

  11. Flame visualization in power stations

    Energy Technology Data Exchange (ETDEWEB)

    Hulshof, H J.M.; Thus, A W; Verhage, A J.L. [KEMA - Fossil Power Plants, Arnhem (Netherlands)

    1993-01-01

    The shapes and temperature of flames in power stations, fired with powder coal and gas, have been measured optically. Spectral information in the visible and near infrared is used. Coal flames are visualized in the blue part of the spectrum, natural gas flames are viewed in the light of CH-emission. Temperatures of flames are derived from the best fit of the Planck-curve to the thermal radiation spectrum of coal and char, or to that of soot in the case of gas flames. A measuring method for the velocity distribution inside a gas flame is presented, employing pulsed alkali salt injection. It has been tested on a 100 kW natural gas flame. 3 refs., 9 figs.

  12. Dynamics and control in nuclear power stations

    International Nuclear Information System (INIS)

    Butterfield, M.H.

    1992-01-01

    This volume presents a wide view of aspects of control of nuclear power stations by taking into consideration the plant as a whole and the protection systems employed therein. Authors with worldwide experience consider all aspects of dynamics and control in the context of both fast and thermal power stations. The topics discussed include the methods of development and applications within the analysis of plant behaviour, the validation of mathematical models, plant testing, and the design and implementation of controls. There are 27 papers all of which are indexed separately; steady states and model evolution (5 papers), control and protection systems (5 papers), transients (7 papers), testing and data (3 papers), model validation (6 papers) and commissioning and operation (1 paper). (author)

  13. Emergency protection and nuclear power station remote monitoring

    International Nuclear Information System (INIS)

    Nowak, K.; Wolf, H.

    1986-01-01

    The States of the Federal Republic of Germany are planning emergency protection measures for the environment of nuclear power stations based on their statutory duty of care. In this connection the paper explains to what extent remote monitoring of nuclear power stations practised by the Federal Supervisory Authorities may support the design and implementation of emergency protection measures. (orig.) [de

  14. Simulators of nuclear power stations

    International Nuclear Information System (INIS)

    Zanobetti, D.

    1984-01-01

    The report deals with the simulators of nuclear power stations used for the training of operators and for the analysis of operations. It reviews the development of analogical, hybrid and digital simulators up to the present, indicating the impact resulting from the TMI-2 accident. It indicates, the components of simulators and the present accepted terminology for a classification of the various types of simulators. It reviews the present state of the art of the technology: how a basic mathematical model of a nuclear power system is worked out and what are the technical problems associated with more accurate models. Examples of elaborate models are given: for a PWR pressurizer, for an AGR steam generator. It also discusses certain problems of hardware technology. Characteristics of present replica simulators are given with certain details: simulated transient evolutions and malfunctions, accuracy of simulation. The work concerning the assessment of the validity of certain simulators is reported. A list of simulator manufacturers and a survey of the principal simulators in operation in the countries of the European Community, in the United States, and in certain other countries are presented. Problem associated with the use of simulators as training facilities, and their use as operational devices are discussed. Studies and research in progress for the expected future development of simulators are reviewed

  15. Multivariable control in nuclear power stations

    International Nuclear Information System (INIS)

    Parent, M.; McMorran, P.D.

    1982-11-01

    Multivariable methods have the potential to improve the control of large systems such as nuclear power stations. Linear-quadratic optimal control is a multivariable method based on the minimization of a cost function. A related technique leads to the Kalman filter for estimation of plant state from noisy measurements. A design program for optimal control and Kalman filtering has been developed as part of a computer-aided design package for multivariable control systems. The method is demonstrated on a model of a nuclear steam generator, and simulated results are presented

  16. Principles of expert fuzzy controller design: AI mobile wall climbing robots for decontamination of nuclear power-station

    International Nuclear Information System (INIS)

    Gradetsky, V.G.; Ul'yanov, S.; Slesarev, Y.V.; Pospelov, D.A.

    1994-01-01

    The arrangement principles for a complex control framework of artificial intelligence control systems are introduced. The notions of intelligence levels with the top boundary (intelligence in large) and the bottom boundary (intelligence in small) are defined. A special methodology for the design of an artificial intelligence control system design for the decontamination of a nuclear power plant using a wall climbing robot with different intelligence levels is presented. The application of WARP (Weight Associative Rule Processor) to the design of an automatic fuzzy controller for the fuzzy correction of the motion of the manipulator and WCR is examined

  17. Water pollution and thermal power stations

    International Nuclear Information System (INIS)

    Maini, A.; Harapanahalli, A.B.

    1993-01-01

    There are a number of thermal power stations dotting the countryside in India for the generation of electricity. The pollution of environment is continuously increasing in the country with the addition of new coal based power stations and causing both a menace and a hazard to the biota. The paper reviews the problems arising out of water pollution from the coal based thermal power stations. (author). 2 tabs

  18. Sources of the wind power stations

    International Nuclear Information System (INIS)

    Chudivani, J.; Huettner, L.

    2012-01-01

    The paper deals with problems of the wind power stations. Describes the basic properties of wind energy. Shows and describes the different types of electrical machines used as a source of electricity in the wind power stations. Shows magnetic fields synchronous generator with salient poles and permanent magnets in the program FEMM. Describes methods for assessing of reversing the effects of the wind power stations on the distribution network. (Authors)

  19. Periodical inspection in nuclear power stations

    International Nuclear Information System (INIS)

    1986-01-01

    Periodical inspection is presently being made of eight nuclear power plants in nuclear power stations. Up to the present time, in three of them, failures as follows have been observed. (1) Unit 3 (PWR) of the Mihama Power Station in The Kansai Electric Power Co., Inc. Nineteen heat-transfer tubes of the steam generators were plugged up due to failure. A fuel assembly with a failed spring fixture and in another the control-rod cluster with a failed control rod fixture were replaced. (2) Unit 2 (PWR) of the Oi Power Station in The Kansai Electric Power Co., Inc. Eight heat-transfer tubes of the heat exchangers were plugged up due to failure. (3) Unit 6 (BWR) of the Fukushima Nuclear Power Station I in The Tokyo Electric Power Co., Inc. A fuel assembly with leakage was replaced. (Mori, K.)

  20. Beaver Valley Power Station and Shippingport Atomic Power Station. 1977 annual environmental report: radiological. Volume 2

    International Nuclear Information System (INIS)

    1978-01-01

    The environmental monitoring conducted during 1977 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station is described. The environmental monitoring program consists of onsite sampling of water, gaseous, and air effluents, as well as offsite monitoring of water, air, river sediments, and radiation levels in the vicinity of the site. The report discusses releases of small quantities of radioactivity to the Ohio River from the Beaver Valley Power Station and Shippingport Atomic Power Station during 1977

  1. Reliability study of nuclear power stations

    International Nuclear Information System (INIS)

    Nemec, J.; Sedlacek, J.

    1975-01-01

    The paper considers the physical and mathematical bases underlying nuclear power station reliability from the standpoints of material fatigue, thermal yield and ageing. The risk of failure of nuclear power station components is determined by means of the Markov stochastic process

  2. Iodine filters in nuclear power stations

    International Nuclear Information System (INIS)

    Wilhelm, J.G.

    1977-04-01

    On the basis of calculated and recorded release rates of nuclear power plants, the significance of iodine releases in the invironmental impact relative to other nuclides is discussed. The release pathways for iodine in LWR-type reactors and the efficiency of various methods to lower the activity release are given. The airborne species of iodine are discussed with regard to their removal in iodine sorption filters and environmental impact. The technical status of iodine removal by means of iodine sorption filters is studied for normal operation and accident conditions in nuclear power stations on the basis of the data given in the relevant literature for the efficiency of a number of iodine sorption materials. The applicability of concepts for ventilation and containment and their influence on iodine filter systems are discussed. Design, structure, and testing of iodine sorption filters are treated in detail; recommendations for design are given, and failure sources are mentioned. (orig.) [de

  3. ALARA organization in nuclear power stations

    International Nuclear Information System (INIS)

    Dollo, R.

    1997-01-01

    EDF's nuclear power stations were built with provisions being made, as from the design stage, to limit radiation sources and the results observed over the first ten years (annual collective dose and dose per unit of less than 2 man.Sv) were considered to be very good. However, these results began to deteriorate from 1988 onwards. At the same time, considerable progress was being made by other generators of electricity, who were achieving results which were better than those achieved by our later units. Furthermore, radiological protection standards are being revised and personal dose limits will soon be lowered. (authors)

  4. New Zealand's Clyde power station

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, J W; Black, J C; Foster, P F

    1987-12-01

    A 100 m-high mass concrete gravity dam, for the generation of 432 MW of power, is under construction at Clyde on the Clutha River in the South Island of New Zealand. A feature of the dam is the provision of a slip joint to allow up to 2 m of movement on the plane of a fault passing through the dam foundation. Details of the dam foundations, seismic design, river channel fault and slip joint, mass concrete, spillway and sluice, powerhouse, and landslide hazard at the site are given. 3 refs.

  5. Design optimization of the Laguna Verde nuclear power station fuel recharge; Optimacion del diseno de recargas de combustible para la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Cortes Campos, Carlos Cristobal [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Montes Tadeo, Jose Luis [Instituto Nacional de Investigaciones Nucleares (ININ), Salazar (Mexico)

    1991-12-31

    It is described, in general terms, the procedure that is followed to accomplish the optimization of the recharge design, and an example is shown where this procedure was applied for the analysis of the type BWR reactor of Unit No. 1 of the Laguna Verde Nuclear Power Station. [Espanol] Se describe en terminos generales el procedimiento que se sigue para realizar la optimacion del diseno de recargas, y se muestra un ejemplo en el que se utilizo dicho procedimiento para el analisis del reactor tipo BWR de la unidad 1, de la Central Laguna Verde (CLV).

  6. Technical evaluation report on the proposed design modifications and technical specification changes on grid voltage degradation for the Millstone Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the proposed design modifications and Technical Specification change for protection of Class 1E equipment from grid voltage degradation for the Millstone Nuclear Power Station, Unit 1. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation finds that the licensee has not provided sufficient information on the undervoltage protection system to allow a complete evaluation into the adequacy of protecting the Class 1E equipment from sustained voltage degradation

  7. Design optimization of the Laguna Verde nuclear power station fuel recharge; Optimacion del diseno de recargas de combustible para la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Cortes Campos, Carlos Cristobal [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Montes Tadeo, Jose Luis [Instituto Nacional de Investigaciones Nucleares (ININ), Salazar (Mexico)

    1992-12-31

    It is described, in general terms, the procedure that is followed to accomplish the optimization of the recharge design, and an example is shown where this procedure was applied for the analysis of the type BWR reactor of Unit No. 1 of the Laguna Verde Nuclear Power Station. [Espanol] Se describe en terminos generales el procedimiento que se sigue para realizar la optimacion del diseno de recargas, y se muestra un ejemplo en el que se utilizo dicho procedimiento para el analisis del reactor tipo BWR de la unidad 1, de la Central Laguna Verde (CLV).

  8. Solar dynamic power systems for space station

    Science.gov (United States)

    Irvine, Thomas B.; Nall, Marsha M.; Seidel, Robert C.

    1986-01-01

    The Parabolic Offset Linearly Actuated Reflector (POLAR) solar dynamic module was selected as the baseline design for a solar dynamic power system aboard the space station. The POLAR concept was chosen over other candidate designs after extensive trade studies. The primary advantages of the POLAR concept are the low mass moment of inertia of the module about the transverse boom and the compactness of the stowed module which enables packaging of two complete modules in the Shuttle orbiter payload bay. The fine pointing control system required for the solar dynamic module has been studied and initial results indicate that if disturbances from the station are allowed to back drive the rotary alpha joint, pointing errors caused by transient loads on the space station can be minimized. This would allow pointing controls to operate in bandwidths near system structural frequencies. The incorporation of the fine pointing control system into the solar dynamic module is fairly straightforward for the three strut concentrator support structure. However, results of structural analyses indicate that this three strut support is not optimum. Incorporation of a vernier pointing system into the proposed six strut support structure is being studied.

  9. Electric machinery and drives in thermal power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery. (TK) [de

  10. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Henderson, B.

    1982-11-01

    Architectural concepts and design proposals associated with the proposed Sizewell B power station are outlined. The figures are in a separate volume. They consist of the site layout plan, an axonometric drawing of the site, an elevations drawing and a colour perspective drawing of 'A', 'B' and 'C' stations. (U.K.)

  11. MHD power station with coal gasification

    International Nuclear Information System (INIS)

    Brzozowski, W.S.; Dul, J.; Pudlik, W.

    1976-01-01

    A description is given of the proposed operating method of a MHD-power station including a complete coal gasification into lean gas with a simultaneous partial gas production for the use of outside consumers. A comparison with coal gasification methods actually being used and full capabilities of power stations heated with coal-derived gas shows distinct advantages resulting from applying the method of coal gasification with waste heat from MHD generators working within the boundaries of the thermal-electric power station. (author)

  12. Environmental surveillance of PWR power stations

    International Nuclear Information System (INIS)

    Conti, M.

    1980-01-01

    The action of Electricite de France with respect to the environment of PWR nuclear power stations is essentially centred on prevention. Controls are carried out at two levels: - before the power station goes on stream (radioecological study), - when the power station is operational. The purpose of the controls effected on the radioactive effluents and the environment is to check that the maximum discharge rate stipulated in the corresponding orders is complied with and to ensure that there are no anomalies in the environment [fr

  13. Space power station. Uchu hatsuden

    Energy Technology Data Exchange (ETDEWEB)

    Kudo, I. (Electrotechnical Laboratory, Tsukuba (Japan))

    1993-02-20

    A calculation tells that the amount of electric power the world will use in the future will require 100 to 500 power plants each with an output of 5-GW class. If this conception is true, it is beyond dispute that utilizing nuclear power will constitute a core of the power generation even though the geographical conditions are severe for nuclear power plants. It is also certain that power generation using clean solar energy will play important roles if power supply stability can be achieved. This paper describes plans to develop space solar power generation and space nuclear power generation that can supply power solving problems concerning geographical conditions and power supply stability. The space solar power generation is a system to arrest solar energy on a static orbit. According to a result of discussions in the U.S.A., the plan calls for solar cell sheets spread over the surface of a structure with a size of 5 km [times] 10 km [times] 0.5 km thick, and electric power obtained therefrom is transmitted to a rectenna with a size of 10 km [times] 13 km, a receiving antenna on the ground. The space nuclear power generation will be constructed similarly on a static orbit. Researches on space nuclear reactors have already begun. 10 refs., 8 figs., 1 tab.

  14. Seismic-resistant design of nuclear power stations in Japan, earthquake country. Lessons learned from Chuetsu-oki earthquake

    International Nuclear Information System (INIS)

    Irikura, Kojiro

    2008-01-01

    The new assessment (back-check) of earthquake-proof safety was being conducted at Kashiwazaki-Kariwa Nuclear Power Plants, Tokyo Electric Co. in response to a request based on the guideline for reactor evaluation for seismic-resistant design code, revised in 2006, when the 2007 Chuetsu-oki Earthquake occurred and brought about an unexpectedly huge tremor in this area, although the magnitude of the earthquake was only 6.8 but the intensity of earthquake motion exceeded 2.5-fold more than supposed. This paper introduces how and why the guideline for seismic-resistant design of nuclear facilities was revised in 2006, the outline of the Chuetsu-oki Earthquake, and preliminary findings and lessons learned from the Earthquake. The paper specifically discusses on (1) how we may specify in advance geologic active faults as has been overlooked this time, (2) how we can make adequate models for seismic origin from which we can extract its characteristics, and (3) how the estimation of strong ground motion simulation may be possible for ground vibration level of a possibly overlooked fault. (S. Ohno)

  15. Sizewell B Power Station control dosimetry system

    International Nuclear Information System (INIS)

    Renn, G.

    1995-01-01

    Sizewell B Power Station is the first Pressurized Water Reactor (PWR) built in the UK for commercial electricity production. An effective control dosimetry system is a crucial tool, in allowing the station to assess its radiological performance against targets. This paper gives an overview of the control dosimetry system at Sizewell B and describes early operating experience with the system. (UK)

  16. Valves and fittings for nuclear power stations

    International Nuclear Information System (INIS)

    1976-01-01

    The standard specifies technical requirements for valves and pipe fittings in nuclear power stations with PWR type reactors. Details of appropriate materials, welding, surface treatment for corrosion protection, painting, and complementary supply are given

  17. Anticorrosional protection in nuclear power station objects

    International Nuclear Information System (INIS)

    Czarnocki, A.; Kwiatkowski, A.

    1976-01-01

    The distribution and qualities of chemical protection and demands concerning preparation of the bottom for protecting coats in nuclear power station objects are discussed. The solutions of protections applied abroad and in the objects of ''MARIA'' reactor are presented. (author)

  18. Heating of water by nuclear power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The aim of this note is to examine: the thermal conditions of the Rhone in its present state; heating caused by the building of nuclear power stations; the main hydrobiological and ecological characteristics of the Rhone [fr

  19. Energy analysis of nuclear power stations

    International Nuclear Information System (INIS)

    Lindhout, A.H.

    1975-01-01

    A study based on a 1000MWe light water reactor power station was carried out to determine the total energy input and output of the power station. The calculations took into account the mining and processing of the ore, enrichment of the uranium, treatment of used nuclear fuel, investment in land, buildings, machinery, and transport. 144 tons of natural uranium produce 6100 million kWh (electric) and 340 million kWh (thermal) per annum. (J.S.)

  20. Electricity supplies in a French nuclear power station

    International Nuclear Information System (INIS)

    2011-01-01

    As the operation of a nuclear power station requires a power supply system enabling this operation as well as the installation safety, this document describes how such systems are designed in the different French nuclear power stations to meet the requirements during a normal operation (when the station produces electricity) or when it is stopped, but also to ensure power supply to equipment ensuring safety functions during an incident or an accident occurring on the installation. More precisely, these safety functions are provided by two independent systems in the French nuclear power stations. Their operation is briefly described. Two different types of nuclear reactors are addressed: pressurised water reactors (PWR) of second generation, EPR (or PWR of third generation)

  1. Principles of nuclear power station control

    International Nuclear Information System (INIS)

    Knowles, J.B.

    1975-12-01

    This memorandum represents lecture notes first distributed as part of a UKAEA introductory course on Reactor Technology held during November 1975. A nuclear power station is only one element of a dispersed interconnected arrangement of other nuclear and fossil-fired units which together constitute the national 'grid'. Thus the control of any one station must relate to the objectives of the grid network as a whole. A precise control of the supply frequency of the grid is achieved by regulating the output power of individual stations, and it is necessary for each station to be stable when operating in isolation with a variable load. As regards individual stations, several special control problems concerned with individual plant items are discussed, such as: controlled reactivity insertions, temperature reactivity time constants and flow instability. A simplified analysis establishes a fundamental relationship between the stored thermal energy of a boiler unit (a function of mechanical construction) and the flexibility of the heat source (nuclear or fossil-fired) if the station is to cope satisfactorily with demands arising from unscheduled losses of other generating sets or transmission capacity. Two basic control schemes for power station operation are described known as 'coupled' and 'decoupled control'. Each of the control modes has its own merits, which depend on the proposed station operating strategy (base load or load following) and the nature of the heat source. (U.K.)

  2. Evolutionary growth for Space Station Freedom electrical power system

    Science.gov (United States)

    Marshall, Matthew Fisk; Mclallin, Kerry; Zernic, Mike

    1989-01-01

    Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

  3. Starting of nuclear power stations

    International Nuclear Information System (INIS)

    Kotyza, V.

    1988-01-01

    The procedure is briefly characterized of jobs in nuclear power plant start-up and the differences are pointed out from those used in conventional power generation. Pressure tests are described oriented to tightness, tests of the secondary circuit and of the individual nodes and facilities. The possibility is shown of increased efficiency of such jobs on an example of the hydraulic tests of the second unit of the Dukovany nuclear power plant where the second and the third stages were combined in the so-colled integrated hydraulic test. (Z.M.). 5 figs

  4. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  5. Distributed systems for protecting nuclear power stations

    International Nuclear Information System (INIS)

    Jover, P.

    1980-05-01

    The advantages of distributed control systems for the control of nuclear power stations are obviously of great interest. Some years ago, EPRI, (Electric Power Research Institute) showed that multiplexing the signals is technically feasible, that it enables the availability specifications to be met and costs to be reduced. Since then, many distributed control systems have been proposed by the manufacturers. This note offers some comments on the application of the distribution concept to protection systems -what should be distributed- and ends with a brief description of a protection system based on microprocessors for the pressurized power stations now being built in France [fr

  6. Power station stack gas emissions

    International Nuclear Information System (INIS)

    Hunwick, Richard J.

    2006-01-01

    There are increasing awareness and pressure to reduce emissions of acid rain and photochemical smog. There is a need to produce new control system and equipment to capture those emissions. The most visible form of pollutions are the chimney smoke, dust and particles of fly ash from mineral matter in the fuel. Acid gases are hard on structures and objects containing limestone. Coal fired power generation is likely to be able to sustain its competitive advantage as a clean source of electricity in comparison with nuclear power and natural gas

  7. Operating experience of Fugen Nuclear Power Station

    International Nuclear Information System (INIS)

    Ohteru, Shigeru; Kaneko, Jun; Kawahara, Toshio; Matsumoto, Mitsuo

    1987-01-01

    The prototype ATR 'Fugen' developed as one of the national project has verified the performance and reliability of the advanced thermal reactor system through the operation for about eight years since 1979, and the elucidation of the characteristics in plutonium utilization and the development and verification of the tuilizing techniques have been advanced. Besides, the operational results and the achievement of the technical development are successively reflected to the design of a demonstration reactor. In this paper, the outline of Fugan and the operational results are reported. The ATR Fugen Power Station is that of the prototype reactor of heavy water moderated, boiling light water cooled, pressure tube type, having the electric output of 165 MW. It started the full scale operation on March 20, 1979, and as of January, 1987, the total generated electric power reached about 7 billion kWh, the time of power generation was about 43,000 h, and the average capacity factor was 60.6 %. Plutonium utilization techniques, the flow characteristics and the dynamic plant characteristics of a pressure tube type reactor, the operational characteristics of a heavy water system and the techniques of handling heavy water containing tritium, and the operational reliability and maintainability of the machinery and equipment installed have been studied. (Kako, I.)

  8. Error management process for power stations

    International Nuclear Information System (INIS)

    Hirotsu, Yuko; Takeda, Daisuke; Fujimoto, Junzo; Nagasaka, Akihiko

    2016-01-01

    The purpose of this study is to establish 'error management process for power stations' for systematizing activities for human error prevention and for festering continuous improvement of these activities. The following are proposed by deriving concepts concerning error management process from existing knowledge and realizing them through application and evaluation of their effectiveness at a power station: an entire picture of error management process that facilitate four functions requisite for maraging human error prevention effectively (1. systematizing human error prevention tools, 2. identifying problems based on incident reports and taking corrective actions, 3. identifying good practices and potential problems for taking proactive measures, 4. prioritizeng human error prevention tools based on identified problems); detail steps for each activity (i.e. developing an annual plan for human error prevention, reporting and analyzing incidents and near misses) based on a model of human error causation; procedures and example of items for identifying gaps between current and desired levels of executions and outputs of each activity; stages for introducing and establishing the above proposed error management process into a power station. By giving shape to above proposals at a power station, systematization and continuous improvement of activities for human error prevention in line with the actual situation of the power station can be expected. (author)

  9. Socioeconomic impacts: nuclear power station siting

    International Nuclear Information System (INIS)

    1977-06-01

    The rural industrial development literature is used to gain insights on the socioeconomic effects of nuclear power stations. Previous studies of large industrial facilities in small towns have important implications for attempts to understand and anticipate the impacts of nuclear stations. Even a cursory review of the nuclear development literature, however, reveals that industrialization research in rural sociology, economic geography and agricultural economics has been largely ignored

  10. The Heysham 2 and Torness nuclear power station projects

    International Nuclear Information System (INIS)

    Cameron, P.J.

    1989-01-01

    At the beginning of the design of the Heysham 2 and Torness Nuclear Power Stations in the UK, it was agreed that the Hinkley Point B/Hunterston B Advanced Gas Cooled reactor design would be repeated. However, the Hinkley Point B/Hunterston B designs dated from 1964, and inevitably safety requirements had escalated in the intervening years. Furthermore, operating experience gained from Hinkley Point B/Hunterston B showed that it was desirable to make changes to particular features. Design changes were therefore included where it was considered essential to improve performance, to improve safety and to improve engineering. The resulting station designs are described. (author)

  11. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  12. Can we afford shutting down power stations?

    International Nuclear Information System (INIS)

    Hesse, David

    2015-01-01

    The author discusses and criticizes some popular beliefs on the profitability of nuclear power stations, on the fact that they are now too old to be exploited, and on the fact that nuclear energy is the most subsidised energy. As some European countries decided to phase out nuclear, he notices that the decrease of gas prices undermines the profitability of nuclear power stations in the USA and that new rules aimed at the reduction of CO 2 emissions result in high subsidies for renewable energies which are however handicapped by the grid ability to integrate all energies. He outlines that shutting down a nuclear power station costs a lot of money to the society, and denies the argument of non-profitability of these stations. He states that the issue of nuclear subsidies is in fact a matter of tax policy. He also states that these so-said old power stations take in fact advantage of numerous technical innovations for their equipment, components, technology and fuels which improve their efficiency, durability, performance and flexibility

  13. Nuclear power generation modern power station practice

    CERN Document Server

    1971-01-01

    Nuclear Power Generation focuses on the use of nuclear reactors as heat sources for electricity generation. This volume explains how nuclear energy can be harnessed to produce power by discussing the fundamental physical facts and the properties of matter underlying the operation of a reactor. This book is comprised of five chapters and opens with an overview of nuclear physics, first by considering the structure of matter and basic physical concepts such as atomic structure and nuclear reactions. The second chapter deals with the requirements of a reactor as a heat source, along with the diff

  14. Developmental state and perspectives of USSR power stations, espec. nuclear power stations

    International Nuclear Information System (INIS)

    1983-01-01

    According to the resolutions of the 25th and 26th party congresses of the CPSU, the Soviet electric and thermal energy economy envisages as the mainstreams in development: Energy projects based on nuclear fuel, i.e. nuclear power stations (NPS), nuclear heat- and -power stations (NHPS) and nuclear heat stations (NHS); fuel-energy complexes: Ekibastuz, Kansk-Achinsk, West-Siberian complex (Tyumen); power stations utilizing non-conventional regenerative energy sources, i.e. solar, geothermal, MHD power stations. Further down, an overview is given on the developmental perspectives of nuclear-heat and nuclear-power economy and on the development of energy management based on fossil fuels. (orig./UA) [de

  15. Beaver Valley Power Station and Shippingport Atomic Power Station. 1984 Annual environmental report, radiological. Volume 2

    International Nuclear Information System (INIS)

    1985-01-01

    This report describes the Radiological Environmental Monitoring Program conducted during 1984 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station. The Radiological Environmental Program consists of on-site sampling of water and gaseous effluents and off-site monitoring of water, air, river sediments, soils, food pathway samples, and radiation levels in the vicinity of the site. This report discusses the results of this monitoring during 1984. The environmental program outlined in the Beaver Valley Power Station Technical Specifications was followed throughout 1984. The results of this environmental monitoring program show that Shippingport Atomic Power Station and Beaver Valley Power Station operations have not adversely affected the surrounding environment. 23 figs., 18 tabs

  16. Hinkley Point 'C' power station public inquiry: statement of case

    International Nuclear Information System (INIS)

    1988-08-01

    This Statement of Case contains full particulars of the case which the Central Electricity Generating Board (CEGB) proposes to put forward at the Hinkley Point ''C'' Inquiry. It relates to the planning application made by the CEGB for the construction of a 1200 MW Pressurized Water Reactor (PWR) power station at Hinkley Point in the United Kingdom, adjacent to an existing nuclear power station. The inquiry will consider economic, safety, environmental and planning matters relevant to the application and the implications for agriculture and local amenities of re-aligning two power transmission lines. The Statement contains submissions on the following matters: Topic 1 The Requirement for the Station; Topic 2 Safety and Design, including Radioactive Discharges; Topic 3 The On-Site Management of Radioactive Waste and Decommissioning of the Station; Topic 4 Emergency Arrangements; Topic 5 Local and Environmental Issues. (author)

  17. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  18. Tarapur Atomic Power Station - - an overview of experience

    International Nuclear Information System (INIS)

    Shah, J.C.

    1979-01-01

    A broad overview of the experience and performance of the Tarapur Atomic Power Station (TAPS) in its role as the developing world's first foray in commercial atomic power has been attempted. The prime objective was not just generation of power but assimilation of an advanced technology on an economically viable basis in the underdeveloped environment compounded with governmental organisational culture. Scientific and technical advances registered through the TAPS experience in the area of design, operation and maintenance are mentioned. Aspects of station performance, management and even economics are also covered. (auth.)

  19. Flame visualization in power stations

    Energy Technology Data Exchange (ETDEWEB)

    Hulshof, H J.M.; Thus, A W; Verhage, A J.L. [KEMA Fossil Generation, Arnhem (Netherlands)

    1994-01-01

    The study on the title subject is aimed at the determination of the form of the flame and the radiation temperature of the flames of the burners in electric power plants. The adjustment of the burners in a boiler is assessed on the basis of the total performance, in which the NO[sub x]- and CO-concentrations in the flue gases are normative. By comparing the burners mutually, deviating adjustments can be observed, applying optical monitoring techniques. Measurements have been carried out of the coal flames in the unit Gelderland13 of the Dutch energy production company EPON and of the gas flames at the Claus plant A and B of the Dutch energy company EPZ. The final aim of the title study is to draft guidelines, based on the measured flame data, by means of which for every individual burner the adjustment of the fuel supply, the relation with the air supply and the swirl of the combustion air can be optimized

  20. Nuclear safeguards control in nuclear power stations

    International Nuclear Information System (INIS)

    Boedege, R.; Braatz, U.; Heger, H.

    1976-01-01

    The execution of the Non-Proliferation Treaty (NPT) has initiated a third phase in the efforts taken to ensure peace by limiting the number of atomic powers. In this phase it is important, above all, to turn into workable systems the conditions imposed upon technology by the different provisions of the Verification Agreement of the NPT. This is achieved mainly by elaborating annexes to the Agreement specifically geared to certain model plants, typical representatives selected for LWR power stations being the plants at Garigliano, Italy (BWR), and Stade, Federal Republic of Germany (PWR). The surveillance measures taken to prevent any diversion of special nuclear material for purposes of nuclear weapons manufacture must be effective in achieving their specific objective and must not impede the circumspect management of operations of the plants concerned. A VDEW working party has studied the technical details of the planned surveillance measures in nuclear power stations in the Federal Republic of Germany and now presents a concept of material balancing by units which meets the conditions imposed by the inspection authority and could also be accepted by the operators of nuclear power stations. The concept provides for uninterrupted control of the material balance areas of the nuclear power stations concerned, allows continuous control of the whole nuclear fuel cycle, is based exclusively on existing methods and facilities, and can be implemented at low cost. (orig.) [de

  1. Evaluation of scenery in power stations

    International Nuclear Information System (INIS)

    Wakatani, Yoshifumi; Yamamoto, Kimio

    1982-01-01

    In the location of power sources hereafter, the location in natural landscape away from urban district tends to increase, accordingly, it is necessary to investigate beforehand the influence to surrounding scenery. However, the method of predicting and evaluating the effect on scenery has not yet been established, therefore, in this study, the basic concept on the investigation, forecast and evaluation of the scenery in power stations was clarified, and the establishment of the work procedure to evaluate the scenery and the effectiveness of the method of forecast and evaluation were examined. Also, the problems when power station facilities exert influence on scenery and the countermeasures to them were considered. Psychological experiment was carried out on the method of evaluation, and the structure and the regulating factors of scenery evaluation were clarified. Recently, good living environment is desired by public, and to the problems of fine environment regarding power stations, more attention is paid. The scenery problems of power stations are the protection of nature and the preservation of good living environment. Since this is an undeveloped field, many problems to be examined still remain. (Kako, I.)

  2. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Gregory, A.R.

    1982-11-01

    The procedure for decommissioning a CEGB nuclear power station is described. Regulatory and licensing procedures in the UK are first listed. The principal sources of radioactivity in the station after final shutdown are classified. The three stages of the decommissioning procedure are then described. Finally the following topics are dealt with briefly: the management of decommissioning wastes, radiological protection during the operation, possible faults arising having radiological significance, design for decommissioning and costs. (U.K.)

  3. Design of radio frequency power amplifiers for cellular phones and base stations in modern mobile communication systems

    OpenAIRE

    Wu, Lei

    2009-01-01

    The mobile radio communication has begun with Guglielmo Marconi's and Alexander Popov's experiments with ship-to-shore communication in the 1890's. Land mobile radio telephone systems have been used since the Detroit City Police Department installed the first wireless communication system in 1921. Since that time, radio systems have become more and more important for both voice and data communication. The modern mobile communication systems are mainly designed in high frequency ranges due...

  4. Sizewell 'B' power station - engineering and construction

    International Nuclear Information System (INIS)

    Walker, A.

    1989-01-01

    The Sizewell 'B' design is based on the Callaway PWR station in Missouri, USA. There have been many papers describing the additional criteria covering safety, operational experience and design and manufacturing practices which were applied to the Callaway reference design and which led to the Sizewell 'B' design concept. This paper describes the implementation of some of these design criteria leading to the layout related design features. Comparisons are drawn with the reference design. This paper concludes by describing various aspects of the design and construction process and the progress which has been made on the Sizewell site. (author)

  5. Studying dynamics of indicators of nuclear power stations exploitation (the case of US nuclear power stations)

    OpenAIRE

    Varshavsky, Leonid

    2013-01-01

    Analysis of external and internal factors influencing significant improvement of economic indicators of US nuclear power stations in the 1990s is carried out. Approaches to modeling dynamics of capacity factors of nuclear power stations are proposed. Comparative analysis of dynamics of capacity factors and occupational radiation exposure for various generations of US nuclear power plants is carried out. Dynamical characteristics of «learning by doing» effects for analyzed indicators are measu...

  6. PAVAN: an atmospheric-dispersion program for evaluating design-basis accidental releases of radioactive materials from nuclear power stations

    International Nuclear Information System (INIS)

    Bander, T.J.

    1982-11-01

    This report provides a user's guide for the NRC computer program, PAVAN, which is a program used by the US Nuclear Regulatory Commission to estimate downwind ground-level air concentrations for potential accidental releases of radioactive material from nuclear facilities. Such an assessment is required by 10 CFR Part 100 and 10 CFR Part 50. The program implements the guidance provided in Regulatory Guide 1.145, Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants. Using joint frequency distributions of wind direction and wind speed by atmospheric stability, the program provides relative air concentration (X/Q) values as functions of direction for various time periods at the exclusion area boundary (EAB) and the outer boundary of the low population zone (LPZ). Calculations of X/Q values can be made for assumed ground-level releases (e.g., through building penetrations and vents) or elevated releases from free-standing stacks. Various options may be selected by the user. They can account for variation in the location of release points, additional plume dispersion due to building wakes, plume meander under low wind speed conditions, and adjustments to consider non-straight trajectories. It computes an effective plume height using the physical release height which can be reduced by inputted terrain features. It cannot handle multiple emission sources. A description of the main program and all subroutines is provided. Also included as appendices are a complete listing of the program and two test cases with the required data inputs and the resulting program outputs

  7. Dosimetry systems in nuclear power stations

    International Nuclear Information System (INIS)

    Weidmann, U.

    1992-01-01

    In the following paper the necessity of the use of electronic dosimetry systems in nuclear power stations is presented, also encompassing the tasks which this type of systems has to fulfill. Based on examples the construction principles and the application possibilities of a PC supported system are described. 5 figs

  8. Process instrumentation for nuclear power station

    International Nuclear Information System (INIS)

    Yanai, Katsuya; Shinohara, Katsuhiko

    1978-01-01

    Nuclear power stations are the large scale compound system composed of many process systems. Accordingly, for the safe and high reliability operation of the plants, it is necessary to grasp the conditions of respective processes exactly and control the operation correctly. For this purpose, the process instrumentation undertakes the important function to monitor the plant operation. Hitachi Ltd. has exerted ceaseless efforts since long before to establish the basic technology for the process instrumentation in nuclear power stations, to develop and improve hardwares of high reliability, and to establish the quality control system. As for the features of the process instrumentation in nuclear power stations, the enormous quantity of measurement, the diversity of measured variables, the remote measurement and monitoring method, and the ensuring of high reliability are enumerated. Also the hardwares must withstand earthquakes, loss of coolant accidents, radiations, leaks and fires. Hitachi Unitrol Sigma Series is the measurement system which is suitable to the general process instrumentation in nuclear power stations, and satisfies sufficiently the basic requirements described above. It has various features as the nuclear energy system, such as high reliability by the use of ICs, the methods of calculation and transmission considering signal linkage, loop controller system and small size. HIACS-1000 Series is the analog controller of high reliability for water control. (Kako, I.)

  9. Water turbine technology for small power stations

    Science.gov (United States)

    Salovaara, T.

    1980-02-01

    The paper examines hydro-power stations and the efficiency and costs of using water turbines to run them. Attention is given to different turbine types emphasizing the use of Kaplan-turbines and runners. Hydraulic characteristics and mechanical properties of low head turbines and small turbines, constructed of fully fabricated steel plate structures, are presented.

  10. Protection and safety of nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The extreme requirements for the safety of nuclear power stations set tasks to the civil engineer which, resulting from dynamic load assumptions, among other things also demand the development of novel special concrete steels with a high elastic limit (here: DYWIDAG thread tie rod) for singly reinforced members. (orig.) [de

  11. Reliability models for Space Station power system

    Science.gov (United States)

    Singh, C.; Patton, A. D.; Kim, Y.; Wagner, H.

    1987-01-01

    This paper presents a methodology for the reliability evaluation of Space Station power system. The two options considered are the photovoltaic system and the solar dynamic system. Reliability models for both of these options are described along with the methodology for calculating the reliability indices.

  12. Reducing nitrogen oxides from power stations

    International Nuclear Information System (INIS)

    Scheller, W.

    1986-12-01

    The report contains 17 individual lectures of the seminar included in databanks. The lectures concern combustion and waste gas measures for reducing the sulfur dioxide and nitrogen oxide emission from coal-fired and gas-fired power stations. (PW) [de

  13. The design of a real-time software system for the distributed control of power station plant

    International Nuclear Information System (INIS)

    Maples, G.C.

    1980-01-01

    As the application of computers to the control of generating plants widens, the problems of resourcing several individual projects over their life cycle can become formidable. This paper indicates the factors relevant to containing the resource requirements associated with software, and outlines the benefits of adopting a standard machine-independent software system which enables engineers rather than computer specialists to develop programs for specific projects. The design objectives which have led to the current development within C.E.G.B. of CUTLASS (Computer Users Technical Languages and Applications Software System) are then considered. CUTLASS is intended to be a standard software system applicable to the majority of future on-line computing projects in the area of generation and is appropriate to stand alone schemes or distributed schemes having a host/target configuration. The CUTLASS system software provides the necessary environment in which to develop, test, and run the applications software, the latter being created by the user by means of a set of engineer-orientated languages. The paper describes the various facilities within CUTALSS, i.e. those considered essential to meet the requirements of future process control applications. Concentrating on the system software relating to the executive functions, and the organisation of global data and communications within distributed systems. The salient features of the engineer-orientated language sets are also discussed. (auth)

  14. Improvements in operational safety performance of the Magnox power stations

    Energy Technology Data Exchange (ETDEWEB)

    Marchese, C.J. [BNFL Magnox Generation, Berkeley (United Kingdom)

    2000-10-01

    In the 43 years since commencement of operation of Calder Hall, the first Magnox power station, there remain eight Magnox stations and 20 reactors still in operation, owned by BNFL Magnox Generation. This paper describes how the operational safety performance of these stations has significantly improved over the last ten years. This has been achieved against a background of commercial competition introduced by privatization and despite the fact that the Magnox base design belongs to the past. Finally, the company's future plans for continued improvements in operational safety performance are discussed. (author)

  15. Design and construction of the PCPV for the 300 MWe THTR nuclear power station in West Germany

    International Nuclear Information System (INIS)

    Bremer, F.

    1976-01-01

    In July 1972 the order was placed in Germany for the first PCPV comprising concrete structure, liner, cooling system and insulation to a consortium under the direction of KRUPP UNIVERSALBAU. The prestressed concrete structure itself was designed and constructed by this company. Extensive tests were carried out on the limestone concrete to establish all the physical properties. Special efforts were made to produce a mix which was both pumpable and generated a minimum amount of heat of hydration. As a departure from normal practice, the cylindrical parts of the vessel are constructed in complete rings up to 2m in height and of the full wall thickness. Experiments showed that, for this method of construction, the temperature difference between the old and the new concrete should not be allowed to exceed 5 0 C. To achieve this, ice cooled water is used in the concrete mix and, in the summer time, liquid nitrogen is added at the time of mixing. The thermal behavior of the concrete has been monitored throughout the construction period. A novel construction feature worth mentioning is that the internal insulation and parts of the core structure were already erected before the construction of the concrete cylinder was complete. This was achieved by providing a temporary closure at the top of the cylinder to maintain clean conditions below. The overall stress calculations and the detailed stress pattern for the lower half of the vessel were carried out by using an axi-symmetric computer program but, for the upper half of the cylinder, a three-dimensional analysis was necessary (due to its geometric arrangement). To prove the safety of the vessel a structural model was used from which the mode of failure was found using a kinematic chain and thus the factor of safety established. A secondary line of safety is the integrity of the liner. (author)

  16. Locating techniques for nuclear power stations

    International Nuclear Information System (INIS)

    Hayashi, Masao

    1983-01-01

    The basic thought in locating nuclear power stations is to examine carefully the suitability of sites and the safety of plants, and in the end, to perfect the safety of public. In Japan, effort is exerted to obtain the trust of local people by carrying out investigation, research and examination from respective standpoints of the government, institutes and industries. The author has engaged in the standardization of the investigation, test and analysis regarding the aseismatic capability of ground, the verifying project in Tadotsu of the coupled vibration of ground and structures, the evaluation of the performance of large vibration tables, the future concept of new locating procedure and so on in the last more than ten years. The technological classification of ground, the technological meaning of active faults, the procedure of the aseismatic design of plants, the difference of earthquake input force according to various locating methods, 12 rules regarding the attenuation of vibration of ground, and the concept of new locating method in the 21st century are explained. As the new locating techniques applicable to central Japan, diluvial ground location, floating location in tunnels, underground location, offshore location and so on must be promoted. (Kako, I.)

  17. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Youngman, P.

    1982-11-01

    The scenic effect of the proposed Sizewell B power station is considered. Offsite planting of trees, landscaping of the areas around the new access road and of the site itself are discussed. The landscape designs are in a separate volume. (U.K.)

  18. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    McFarlane, J.D.

    1982-11-01

    The NNC construction programme for the Sizewell B nuclear power station is outlined. The following topics are considered: constructability aspects of the Sizewell B design; overall project programme and organization; NNC target construction programme; construction planning; material quantities and installation rates; site construction manpowers; construction contracting policy; site industrial relations and productivity; site management. (U.K.)

  19. Systematic evaluation program review of NRC safety topic VII-2 associated with the electrical, instrumentation and control portions of the ESF system control logic and design for the Dresden Station, Unit II nuclear power plant

    International Nuclear Information System (INIS)

    St Leger-Barter, G.

    1980-11-01

    This report documents the technical evaluation and review of NRC Safety Topic VII-2, associated with the electrical, instrumentation, and control portions of the ESF system control logic and design for the Dresden Station Unit II nuclear power plant, using current licensing criteria

  20. The design and performance of the first fully automatic non-grid 5 MW multi-diesel / mini hydro / battery converter power stations

    International Nuclear Information System (INIS)

    Ahmad Shadzli Abdul Wahab

    2000-01-01

    Electricity power supply in remote communities and towns are traditionally and hitherto supplied by diesel generator sets of varying capacities and sizes -from few kilowatt to few megawatts. Its proven to be versatile, robust, modular cheaper capital investment, reliable and easy to operate and maintain. These features are what make diesel generators most preferred choice for generating electric power to power hungry remote communities. The main draw back, though, is its increasingly high cost of operation and maintenance, largely due to upward trend in the cost of diesel fuel, high cost of engines spare parts plus the inflationary nature of salary and wages of operators. For these reasons, engineers and technologists have for years worked tirelessly to find ways and means to reduce the O and M costs. One of the novel ideas was to hybrid the conventional diesel generating system with renewable energy resources, such as mini hydro, solar photovoltaic or wind energy. Many prototypes involving several configurations of energy resources eg diesel/PV/ battery, diesel/wind/battery, diesel/mini hydro/battery have been tested but none has so far has been as successful as Sema/ Powercorp automated Intelligent Power System (IPS). Based on microprocessor hardware, powerful computer software programming and satellite communication technology, the IPS -equipped diesel power station can now now be operated fully automatic with capability of remote control and monitoring. The system is versatile in maximising the use of renewable energy energy resources such as wind, mini hydro or solar thereby reducing very significantly the use of diesel fuel. Operation and maintenance costs also are reduced due to the use of minimum manpower and and increase in fuel efficiency of the engines. The tested and proven IPS technology has been operating successfully for the last ten years in remote diesel stations in Northern Territory, Australia, Rathlin Island, Northern Ireland and its latest and

  1. Safety planning for nuclear power stations

    International Nuclear Information System (INIS)

    Tadmor, J.

    1979-01-01

    The article shows that compared to the many industries and other human activities, nuclear power stations are among the safest. A short description of the measures taken to prevent accidents and of the additional safety means entering into action if an accident does occur is presented. It is shown that in nuclear plants the death frequency following malfunctioning is 1 death in 100.000 years whereas deaths following other human activities is 1 in 2 to 100 years and following natural calamities like earthquakes and floods is 1 in 10 years. As an example it is shown that for a population of 15.000.000 living in a radius of 40 km around 100 power stations the average number of deaths will be of 2 per year as compared to 4200 from road accidents with the corresponding number of injuries of 20 and 375.000 respectively. (B.G.)

  2. The decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Barker, F.

    1992-01-01

    This report has been commissioned by the National Steering Committee of Nuclear Free Local Authorities to provide: a comprehensive introduction to the technical, social, political, environmental and economic dimensions to nuclear power station decommissioning; an independent analysis of Nuclear Electric's recent change of decommissioning strategy; the case for wider public involvement in decision making about decommissioning; and a preliminary assessment of the potential mechanisms for achieving that essential wider public involvement

  3. Requirement profile for nuclear power station personnel

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1984-01-01

    The starting point in deriving the requirement profile for the shift personnel in the control rooms of nuclear power stations is information of a technical, organisational and ergonomic kind. The technique used, the distribution of work to different work areas and the configuration of the workplace is determined by the tasks and the environmental conditions in which they have to be done. (orig./DG) [de

  4. Front against the Temelin nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Though the main concern of the author is the Czechoslovakian Temelin power station, the main target of his attacks are the Austrian proponents of nuclear energy i.e. the Reactor Safty Commission and the Austrian Chancellor. The newly opened possibility of anti-nuclear propaganda in the CSFR, by Greenpeace and the author's organisation is welcomed. The number of signatures collected against Temelin is given as 350.000. 815 signatures come from Japan: a facsimile of some Japanese signatures is presented

  5. Thermodynamic power stations at low temperatures

    Science.gov (United States)

    Malherbe, J.; Ployart, R.; Alleau, T.; Bandelier, P.; Lauro, F.

    The development of low-temperature thermodynamic power stations using solar energy is considered, with special attention given to the choice of the thermodynamic cycle (Rankine), working fluids (frigorific halogen compounds), and heat exchangers. Thermomechanical conversion machines, such as ac motors and rotating volumetric motors are discussed. A system is recommended for the use of solar energy for irrigation and pumping in remote areas. Other applications include the production of cold of fresh water from brackish waters, and energy recovery from hot springs.

  6. Efficiency of a small wind power station

    International Nuclear Information System (INIS)

    Ivanov, K.; Christov, Ch.; Kozarev, N.

    2001-01-01

    The aim of the study is to obtain the optimal solution for wind station both by technical parameters and costs. The energetic characteristics of the wind as a renewable energy source are discussed and assessment of the economical efficiency is made. For the determination of the optimal wind parameters the method of integral wind curves is used. The low power wind generators (0.4 - 1.5 kW) are considered as optimal for the presented wind characteristics

  7. Community reaction to noise from power stations

    International Nuclear Information System (INIS)

    Job, R.F.S.; Hede, A.J.

    1989-01-01

    Community reaction is a major consideration in noise control. The relationship between noise exposure and community reaction has received considerable attention in relation to railway, traffic, aircraft and impulsive noise. The results have shown a number of features in common, including: similarly shaped noise/reaction functions; similar results across different measurement techniques and cultures, noise/reaction correlations based on individual respondent data are low (mean r = 0.42 ± 0.12: Job, 1988), although correlations of .58 and above have been reported correlations based on data grouped by noise exposure are generally high and relatively unaffected by the type of noise studied whereas correlations based on individual data tend to be lower for impulsive noise than for transportation noise attitude to the noise source and sensitivity to noise shows strong correlations with reaction. This paper reports that the present study was undertaken in order toe establish over a wider range of noise exposure whether community reaction to power station noise is similar to reaction to other types of non-impulsive noise. It is possible that reaction is different given important differences in the source of the noise which may affect attitude. Attitudes towards power stations may be more positive than attitudes to aircraft or rail noise for example, because almost all respondents use electricity regularly every day. Further, the power stations in the present study provided employment for the relatively small surrounding communities

  8. Electrical power systems for Space Station

    Science.gov (United States)

    Simon, W. E.

    1984-01-01

    Major challenges in power system development are described. Evolutionary growth, operational lifetime, and other design requirements are discussed. A pictorial view of weight-optimized power system applications shows which systems are best for missions of various lengths and required power level. Following definition of the major elements of the electrical power system, an overview of element options and a brief technology assessment are presented. Selected trade-study results show end-to-end system efficiencies, required photovoltaic power capability as a function of energy storage system efficiency, and comparisons with other systems such as a solar dynamic power system.

  9. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Newell, J.E.

    1982-11-01

    A brief description is given of the design of the steam generators for the proposed Sizewell B power station. A review of the operational behaviour of earlier models is presented. The problem of degradation of steam generator tubes is considered in some detail. Model F steam generator, which has been incorporated into the Sizewell B reference design, is discussed. Finally the impact of steam generator tube degradation upon radiological safety is discussed. (U.K.)

  10. Circulating water pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Satoh, Hiroshi; Ohmori, Tsuneaki

    1979-01-01

    Shortly, the nuclear power station with unit power output of 1100 MW will begin the operation, and the circulating water pumps manufactured recently are those of 2.4 to 4 m bore, 840 to 2170 m 3 /min discharge and 2100 to 5100 kW driving power. The circulating water pumps are one of important auxiliary machines, because if they fail, power generation capacity lowers immediately. Enormous quantity of cooling water is required to cool condensers, therefore in Japan, sea water is usually used. As siphon is formed in circulating water pipes, the total head of the pumps is not very high. The discharge of the pumps is determined so as to keep the temperature rise of discharged water lower than 7 deg. C. The quantity of cooling water for nuclear power generation is about 50% more as compared with thermal power generation because of the difference in steam conditions. The total head of the pumps is normally from 8 to 15 m. The circulating water pumps rarely stop after they started the operation, therefore it is economical to determine the motor power so that it can withstand 10% overload for a short period, instead of large power. At present, vertical shaft, oblique flow circulating water pumps are usually employed. Recently, movable blade pumps are adopted. The installation, construction and materials of the pumps and the problems are described. (Kako, I.)

  11. Care management at Ikata Power Station

    International Nuclear Information System (INIS)

    Sakai, Koji

    1982-01-01

    For operating nuclear power stations safely and economically, it is necessary to control nuclear fuel itself and reactor cores. Nuclear fuel must be controlled consistently in view of quantitative balance and operational method over the whole nuclear fuel cycle of uranium ore, fabrication, burning in reactors and reprocessing, based on the plan of using fuel in electric power companies. The control of the burning in reactors is called core management, and it is important because the users of fuel execute it. For dealing with such core management works, Shikoku Electric Power Co., Inc., has developed the computer code system for grasping the state of fuel exchange and the burning condition in reactors and used it since 1972. The outline of the core management in Ikata Power Station is reported in this paper centering around computing works. The core management works are divided into those at the time of regular inspection and those in operation. In the regular inspection, fuel inspection, fuel exchange and reactor physics test are performed. In operation, the burning condition of fuel is grasped. The technical computations corresponding to these works are explained, and the examples of computations are shown. (Kako, I.)

  12. Obrigheim nuclear power station. Annual report 1987

    International Nuclear Information System (INIS)

    Koerner, C.

    1988-01-01

    The Obrigheim nuclear power station was operated at full load during the year 1987; 7.351 operating hours procuded electrical energy of 2.607 GWh. This is the fifth best annual result during Obrigheim's operating period. Since commissioning in October 1968, 139.310 hours of operation have generated 46.681 GWh (gross) and from test operation in March 1969 until the end of 1987, 138.530 hours of operation have generated 46.569 GWh. This is an availability of power of 81.6% in this period and a time availability of 83.9%. In 1987, the plant was shut down for 1.222 hours for the 18th refueling including testing, inspection and repair work. Apart from refueling, the plant had a good time availability and therefore contributed 5% to the safe, economical and environmentally acceptable electricity supply of the Land Baden-Wuerttemberg. The power station is of great significance to the region, both in terms of power supply and the economy. (orig./HP) [de

  13. Vacuum switchgear for power station auxiliary switchboards

    International Nuclear Information System (INIS)

    Coombs, P.E.

    1992-01-01

    Sizewell B is the first UK power station in which vacuum switchgear is used for the auxiliary switchboards. Previously the 3.3kV, 6.6kV or 11kV switchgear has used air-break circuit breakers and fused air-break contactors, known as motor starting devices or fused switching devices (FSD). The use of vacuum interrupters is therefore a new technology in this application, although it has been established in the UK distribution network and in industrial installations from the mid 1970s. Vacuum switchgear was already in use in the USA for power station auxiliary switchgear at the time that it was proposed for Sizewell B. The Sizewell B high voltage auxiliary switchgear comprises eight Unit and Station Auxiliary Switchboards at 3.3kV and 11kV, and four 3.3kV Essential Switchboards for the essential safety related circuits, making a total of 65 circuit breakers plus FSD panels. (Author)

  14. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    George, B.V.

    1982-11-01

    The design of the proposed Sizewell B power station and the policies which have guided design choices are outlined. The specification for Sizewell B and the production of its reference design are discussed. The Nuclear Steam Supply System and the associated safeguards systems are dealt with in more detail. The protection against hazards causing damage to plant and the protection provided to reduce radiation exposure are described. Control, instrumentation and operation of the plant are discussed. A section on quality of design follows. Finally economic aspects of the design are dealt with. (U.K.)

  15. Port construction works in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Narahara, Akio; Minamata, Hisashi; Harada, Kensaku

    1982-01-01

    Sendai Nuclear Power Station is the second nuclear power station of Kyushu Electric Power Co., Inc., with two PWR plants of 890 MW each, and the operation of No.1 plant will be started in July, 1984, and that of No.2 plant in March, 1986. The civil engineering works for both plants were started in June, 1978, and March, 1981, respectively, and the rate of progress as of the end of September, 1982, was 97 % and 66 %, respectively. In the construction of this power station, the port facility was provided for the transport of construction materials and spent fuel, and for the intake of condenser cooling water. In order to make the construction by dry work, the double cofferdam structures with steel sheet piles were made offshore. The use of the wharf was started in March, 1980, though typhoons hit the area several times, and the dredging in the port was completed in May, 1982. The outline of the plan of this power station, the state of affairs before the start of construction, the outline of the port construction works, the topography, geological features and sea conditions, the design of the port such as breakwaters, unloading wharf and water intake, the manufacture and installation of caissons, dredging, and the temporary cofferdam works for water intake are described. (author)

  16. Managing nuclear power stations for success

    International Nuclear Information System (INIS)

    Smith, G.

    2006-01-01

    Ontario Power Generation's (OPG) top operational priority is to manage its nuclear assets to ensure they operate as safely, efficiently and cost effectively as possible. In meeting these objectives, the company is focused on continuously improving its nuclear performance and benchmarking that performance against the best in North America. This presentation explores how OPG is improving its nuclear performance and the steps it is taking to sustain performance success going forward. Topics to be discussed include the measures OPG is taking to enhance human performance and station reliability as well as the company's preparations to determine if a business case exists for extending the lives of the Pickering B and eventually the Darlington nuclear stations. (author)

  17. Lifetime management of Magnox power stations

    International Nuclear Information System (INIS)

    Smitton, C.

    1998-01-01

    Magnox Electric, which is, a subsidiary of BNFL, operates six nuclear power plants that have an average age of about 33 years. The procedures developed to maintain the plants and ensure nuclear safety in longer-term operation are reviewed. The technical limit on station lifetimes is expected to be determined by the effect of ageing on major reactor structures where replacement is impractical. Examination of the effect of ageing confirms that the stations are capable of operating to a life of at least 40 years. The economic factors affecting operation are reviewed, recognising the need to sell electricity in a competitive market. Recently Magnox Electric and BNFL have merged and all plant supporting Magnox operations are now within a single integrated company that will provide further opportunities for improved efficiency. (author)

  18. Dealing with operational power station wastes

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, R B [Central Electricity Generating Board, London (UK). Nuclear Health and Safety Dept.

    1981-08-01

    The disposal of wastes from nuclear power stations is discussed. Liquid and gaseous wastes, from magnox stations, which are of low level activity, are dispersed to the sea or estuaries on coastal sites or for the case of Trawfynyeld, to the nearby lake. Low activity solid wastes are either disposed of on local authority tips or in shallow land burial sites. Intermediate level wastes, consisting mainly of wet materials such as filter sludges and resins from cooling ponds, are at present stored in shielded storage tanks either dry or under water. Only one disposal route for intermediate waste is used by Britain, namely, sea-dumping. Materials for sea dumping have to be encapsulated in a durable material for example, concrete.

  19. Radiator selection for Space Station Solar Dynamic Power Systems

    Science.gov (United States)

    Fleming, Mike; Hoehn, Frank

    A study was conducted to define the best radiator for heat rejection of the Space Station Solar Dynamic Power System. Included in the study were radiators for both the Organic Rankine Cycle and Closed Brayton Cycle heat engines. A number of potential approaches were considered for the Organic Rankine Cycle and a constructable radiator was chosen. Detailed optimizations of this concept were conducted resulting in a baseline for inclusion into the ORC Preliminary Design. A number of approaches were also considered for the CBC radiator. For this application a deployed pumped liquid radiator was selected which was also refined resulting in a baseline for the CBC preliminary design. This paper reports the results and methodology of these studies and describes the preliminary designs of the Space Station Solar Dynamic Power System radiators for both of the candidate heat engine cycles.

  20. Economical dismantling of nuclear power stations

    International Nuclear Information System (INIS)

    Mallok, J.; Andermann, H.

    1999-01-01

    The dismantling of nuclear power stations requires a high degree of security and economic efficiency due to the strong contamination of components and the close spatial conditions. In order to protect involved staff from radiation, modern remote-controlled technology is applied in sectors with heavy radioactive contamination such as reactor pressure vessels. The article shows, that the dismantling of reactor pressure vessels using a remote-controlled milling machine developed by the Siemens subsidiary Mechanik Center Erlangen GmbH, can be done in a secure and efficient way. (orig.) [de

  1. Pilot plant experiments at Wairakei Power Station

    International Nuclear Information System (INIS)

    Brown, Kevin L.; Bacon, Lew G.

    2009-01-01

    In the mid-1990s, several pilot plants were constructed at Wairakei to either improve the operational and economic performance of the power station or to mitigate the environmental effects of discharges to the Waikato River. The results of the following investigations are discussed: (1) fluid flow dynamic effects on silica scaling; (2) production of silica sols of predetermined particle size to evaluate the potential for generating commercial grade silica products; (3) use of 'sulfur oxidising bacteria' for the abatement of dissolved hydrogen sulphide in cooling water; (4) removal of arsenic from separated geothermal water; (5) steam line condensate corrosion; and (6) measurement and modelling of steam scrubbing in Wairakei's long steamlines. (author)

  2. CEGB nuclear power stations basic emergency plan

    International Nuclear Information System (INIS)

    1978-03-01

    The introduction states that this is a typical emergency plan for a nuclear power station employing about 500 people, having two reactors and a total electrical output of 500 Megawatts in an intensively farmed rural area. The document has the following headings: definitions ('site incident', etc); functions of the site emergency organization; conditions for taking emergency action; persons empowered to declare or cancel a site incident or an emergency; emergency actions by staff; control centres; communication; collaboration with other bodies; warnings; transport; house rules; public information centre. (U.K.)

  3. Ten years of KRB Gundremmingen demonstration power station

    International Nuclear Information System (INIS)

    Facius, H. von; Ettemeyer, R.

    1976-01-01

    In August 1976 the first large nuclear power station in the Federal Republic, the KRB Gundremmingen plant with a net power of 237 MWe, has been in operation ten years. The construction of KRB as a demonstration plant was a major step forward on the way to the economic utilization of nuclear power for German utilities. Design and operation of the plant have decisively influenced the further development of the technology of light water reactors in the Federal Republic. Unlike the Kahl Experimental Nuclear Power Station (VAK), which was a test facility designed to generate experience and to train personnel, the decision to build KRB from the outset was conditional upon the fulfillment of economic criteria. Here are some of the aspects in which KRB has greatly influenced the development of nuclear power station technology: first application of internal steam-water separation instead of a steam drum with a water content of the steam of less than 1%; construction of a reactor buildung with all the necessary safety factors; solution of the corrosion and erosion problems linked with the use of a saturated steam turbine; special measures taken to prevent the turbine from speeding up due to post-evaporation effects after shutdown. Detailed comments are devoted to the subjects of availability, causes of failure and repair work. (orig.) [de

  4. Operating experience and performance at Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Mittal, Subhash; Gupta, J.P.

    1998-01-01

    Narora Atomic Power Station consists of two units of 220 MWe capacity each. These are Pressurized Heavy Water Reactors, fuelled by natural uranium, moderated and cooled by heavy water. The Station is owned by Nuclear Power Corporation of India Ltd., which is responsible for design, construction, commissioning, and operation of all nuclear power stations in the country. NAPS was the first opportunity to apply operating experiences in design, keeping in view the evolving safety and seismicity requirements, ease of maintenance, inservice inspection needs, improved construction ability and standardization. Both the units of NAPS are having improved safety standards of current international levels. All the equipment are indigenous with improved quality and reliability. The first unit of the station went critical in March 1989 and synchronized to the grid in July 1989. The second units followed with its criticality in October 1991 and synchronization in January 1992. Considering the initial stabilizing period, the performance of both units of NAPS has progressively improved over the years. The annual capacity factor for NAPS - 1 was 90.01% and for NAPS - 2 was 89.01% for the financial year 1997-1998. This paper presents an analysis of the performance during the last three years and measures taken to improve it. The stated enhanced performance could be achieved by improvement in human performance by training/re-training, scrupulous monitoring and review of equipment/systems, institution of adequate procedure and ensuring their adherence. (authors)

  5. thermal power stations' reliability evaluation in a hydrothermal system

    African Journals Online (AJOL)

    Dr Obe

    A quantitative tool for the evaluation of thermal power stations reliability in a hydrothermal system is presented. ... (solar power); wind (wind power) and the rest, thermal power and ... probability of a system performing its function adequately for ...

  6. Application of the minicomputer at Genkai Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Kitamura, H [Kyushu Electric Power Co., Inc., Fukuoka (Japan)

    1977-03-01

    Genkai Nuclear Power Station introduced a minicomputer system for the data control purpose in addition to a process control computer introduced in the same manner as other PWR nuclear power stations. This system employs two computers; the one for on-line data aquisition, and another for data processing. The control system introduced includes four systems amoung various data control businesses in the nuclear power station. The language used is mainly an assembler language. The first is the meteorological control system which collects, edits and transmits the weather data sent from the observation instruments around the power station. The second is the personal radiation exposure control system which is designed to realize the labor-saving in book-keeping, the speed-up and the improvement of accuracy in the preparation of the reports to the authorities and the head office and the data for exposure control, and the unification of data processing. The third is the waste control system composed of three subsystems of gas, liquid and solid waste control. The fourth is the maintenance and repair control system which gives inputs to the computer according to the classification written in the slips for maintenance and repair, and prepares a number of statistical tables for maintenance control.

  7. Slovak power stations (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Slovak power stations, s.a. (SE) in 1997 is presented. These activities are reported under the headings: (1) Foreword of the chairman of the Board of directors; (2) Highlights of 1997; (3) Board of directors; (4) Supervisory board; (5) Organisation structure of SE; (6) Branches of SE; (7) Auditor's report; (8) Balance sheet / Economic balance; (9) Economic results; (10) Analysis of economic result; (11) SE capital investment in other trade companies; (12) Basic data; (13) Management and operation of the Slovak Republic's power system; (14) Labour safety and health, fire protection; (15) Electricity trade; (16) Trade heat; (17) Customer services provided to electricity users (18) Investment programme; (19) Environmental protection; (20) Support of renewable; (21) Nuclear safety; (22) Quality system; (23) International co-operation; (24) Centrel; (25) Information technology; (26) Public relations; (27) Business strategy and development programme; (28) Strategic change programme

  8. The regional issues involved in the siting of power stations

    International Nuclear Information System (INIS)

    Livingstone, R.

    1980-01-01

    This paper deals with the regional implications of power station siting in England and Wales and refers to the procedures used by the CEGB to find and develop sites. The resources required for a power station are outlined both for conventional and nuclear stations and the possible development of uses for the rejected heat from power stations as a result of the energy crisis is discussed. (U.K.)

  9. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  10. Regulatory experience in nuclear power station decommissioning

    International Nuclear Information System (INIS)

    Ross, W.M.; Waters, R.E.; Taylor, F.E.; Burrows, P.I.

    1995-01-01

    In the UK, decommissioning on a licensed nuclear site is regulated and controlled by HM Nuclear Installations Inspectorate on behalf of the Health and Safety Executive. The same legislative framework used for operating nuclear power stations is also applied to decommissioning activities and provides a continuous but flexible safety regime until there is no danger from ionising radiations. The regulatory strategy is discussed, taking into account Government policy and international guidance for decommissioning and the implications of the recent white paper reviewing radioactive waste management policy. Although each site is treated on a case by case basis as regulatory experience is gained from decommissioning commercial nuclear power stations in the UK, generic issues have been identified and current regulatory thinking on them is indicated. Overall it is concluded that decommissioning is an evolving process where dismantling and waste disposal should be carried out as soon as reasonably practicable. Waste stored on site should, where it is practical and cost effective, be in a state of passive safety. (Author)

  11. Siting technology of underground nuclear power station

    International Nuclear Information System (INIS)

    Motojima, M.; Hibino, S.

    1989-01-01

    For the site of a nuclear power station, it may be possible to select a seaside mountain area, if the condition is suitable to excavate large rock caverns in which a reactor and other equipments are installed. As the case study on the siting technology for an underground nuclear power station, the following example was investigated. The site is a seaside steep mountain area, and almost all the equipments are installed in plural tunnel type caverns. The depth from the ground surface to the top of the reactor cavern is about 150 m, and the thickness of the rock pillar between the reactor cavern of 33 m W x 82 mH x 79 mD and the neighboring turbine cavern is 60 m. In this paper, the stability of rock caverns in this example, evaluated by numerical analysis, is described. The numerical analysis was carried out on the central cross section of the reactor cavern, taking the turbine cavern, geostress, the mechanical properties of rock mass and the process of excavation works in consideration. By the analysis, the underground caverns in this example were evaluated as stable, if the rock quality is equivalent to C H class or better according to the CRIEPI rock classification. (K.I.)

  12. Quality assurance in the structural installations of nuclear power stations

    International Nuclear Information System (INIS)

    Schnellenbach, G.; Wrage, S.

    1985-01-01

    The concept of quality assurance distinguishes between self-monitoring of the design, manufacturing and executing firms and external monitoring by state institutions or by experts commissioned by them. The long-term control of structures is within the area of responsibility of the owner. This quality assurance concept is controlled in detail by statutes, which clearly define responsibilities. This structural engineering quality assurance system also forms the basis for the design, construction and utilization of structural installations of nuclear power stations; requirements emanating from the Atomic Energy Acts for the structural installations demand, however, to some extent a sharpening of self- and external monitoring. Therefore, today a quality concept has been developed for the important engineering safety-related buildings of nuclear power stations. This concept takes account of the strict requirements imposed and fulfils the requirement of KTA 1401. (orig.) [de

  13. Development and construction of nuclear power and nuclear heating stations in the USSR

    International Nuclear Information System (INIS)

    Schmidt, G.; Kirmse, B.

    1983-01-01

    The state-of-the-art of nuclear power technology in the USSR is reviewed by presenting characteristic data on design and construction. The review takes into consideration the following types of facilities: Nuclear power stations with 1000 MWe pressurized water reactors, with 1000 MWe pressure tube boiling water reactors, and with 600 MWe fast breeder reactors; nuclear heating power stations with 1000 MWe reactors and nuclear heating stations with 500 MWth boiling water reactors

  14. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Dutton, L.M.

    1982-11-01

    A description is given of the main sources of radioactivity and the barriers which would prevent their release at the proposed Sizewell B nuclear power station. The methods of calculating the radiological consequences associated with the most significant faults within the design are outlined. The following possibilities are considered: faults involving high fuel temperatures; loss of coolant accidents; secondary coolant circuit faults; waste processing system faults; irradiated fuel faults. (U.K.)

  15. Occupational radiation exposures at Canadian CANDU nuclear power stations

    International Nuclear Information System (INIS)

    LeSurf, J.E.; Taylor, G.F.

    1982-09-01

    In Canada, methods to reduce the radiation exposure to workers at nuclear power reactors have been studied and implemented since the early days of the CANDU reactor program. Close collaboration between the designers, the operators, and the manufacturers has reduced the total exposure at each station, the dose requirement to operate and maintain each successive station compared with earlier stations, and the average annual exposure per worker. Specific methods developed to achieve dose reduction include water chemistry; corrosion resistant materials; low cobalt materials; decontamination; hot filtration, improved equipment reliability, maintainability, and accessibility; improved shielding design and location; planning of work for low exposure; improved operating and maintenance procedures; removal of tritium from D 2 O systems and work environments; improved protective clothing; on-power refuelling; worker awareness and training; and many other small improvements. The 1981 occupational dose productivity factors for Pickering A and Bruce A nuclear generating stations were respectively 0.43 and 0.2 rem/MW(e).a

  16. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  17. Fire safety in nuclear power stations

    International Nuclear Information System (INIS)

    Kench, R.L.

    1988-01-01

    This is the first of a three-part report on the fire hazards in nuclear power stations and some of the precautions necessary. This part lists the United Kingdom reactors, outlines how they work, the fuels used, the use of moderators and coolants and the control systems. Although the risk of fire is no higher than in fossil-fuel stations the consequences can be more serious. The radioactive materials used mean that there is biological shielding round the core, limitations on waste emissions allowed and limited access to some zones. Reliable shut-down systems are needed. Care in the use of water to fight fires must be exercised -it can act as a moderator and cause an otherwise safe core to go critical. The Wigner effect in graphite moderated reactors is explained. Fires in graphite can be extinguished by carbon dioxide. Argon, chlorine and sodium silicate can also be effective. In sodium cooled reactors fires can be allowed to burn themselves out, or TEC and argon could be used to extinguish the flame. (UK)

  18. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Arnold, P.J.

    1982-11-01

    The systems benefits of the selection of the Sizewell site for a PWR power station are dealt with. The transmission modifications which would be needed to provide effective connection of this station to the system are considered. (U.K.)

  19. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  20. Nuclear power station main control room habitability

    International Nuclear Information System (INIS)

    Paschal, W.B.; Knous, W.S.

    1989-01-01

    The main control room at a nuclear power station must remain habitable during a variety of plant conditions and postulated events. The control room habitability requirement and the function of the heating, ventilating, air-conditioning, and air treatment system are to control environmental factors, such as temperature, pressure, humidity, radiation, and toxic gas. Habitability requirements provide for the safety of personnel and enable operation of equipment required to function in the main control room. Habitability as an issue has been gaining prominence with the Advisor Committee of Reactor Safeguards and the Nuclear Regulatory Commission since the incident at Three Mile Island. Their concern is the ability of the presently installed habitability systems to control the main control room environment after an accident. This paper discusses main control room HVAC systems; the concern, requirements, and results of NRC surveys and notices; and an approach to control room habitability reviews

  1. Living near a nuclear power station

    International Nuclear Information System (INIS)

    Marcan, P.; Slovak, K.

    2007-01-01

    The need to expand nuclear power and its advantages are discussed publicly nearly each week. According to politicians and the nuclear lobby investing tens of billions Sk at Mochovce will bring Slovakia the often cited 'independence and energy self-sufficiency'. It will also mean profit for Slovenske elektrarne and the company's shareholders - the state and Italian company, Enel. In addition to the lively discussion on the pros and cons of nuclear energy, TREND was also interested in the living conditions around the concrete and strictly guarded, potentially dangerous plants and in the opinion of the people most affected by Mochovce and Jaslovske Bohunice on expansion of the existing and the building of new nuclear power plants. The construction of nuclear powers stations in these regions was not only about new jobs. The state 'prescribed' iodine pills and did not allow any construction in the region and, in the case of Mochovce, ordered the complete demolition of a village. The only thing that remained from Mochovce village was the church. 'And when it was found that the power plant would not reach it, it was even given a new roof. Former inhabitants, especially the older ones that had problems accepting the evacuation, used to visit it often,' explained Jan Foldy, the head of the local municipality in Kalna nad Hronom. After many years, life in the neighbouring villages is not bad. Their budgets are overflowing and so they can afford to spoil their inhabitants with free cable TV and high standard sport facilities, which should partly compensate for the fact that the people are living so close to a nuclear facility. (authors)

  2. Valves for condenser-cooling-water circulating piping in thermal power station and nuclear power station

    International Nuclear Information System (INIS)

    Kondo, Sumio

    1977-01-01

    Sea water is mostly used as condenser cooling water in thermal and nuclear power stations in Japan. The quantity of cooling water is 6 to 7 t/sec per 100,000 kW output in nuclear power stations, and 3 to 4 t/sec in thermal power stations. The pipe diameter is 900 to 2,700 mm for the power output of 75,000 to 1,100,000 kW. The valves used are mostly butterfly valves, and the reliability, economy and maintainability must be examined sufficiently because of their important role. The construction, number and arrangement of the valves around a condenser are different according to the types of a turbine and the condenser and reverse flow washing method. Three types are illustrated. The valves for sea water are subjected to the electrochemical corrosion due to sea water, the local corrosion due to stagnant water, the fouling by marine organisms, the cavitation due to valve operation, and the erosion by earth and sand. The fundamental construction, use and features of butterfly valves are described. The cases of the failure and repair of the valves after their delivery are shown, and they are the corrosion of valve bodies and valve seats, and the separation of coating and lining. The newly developed butterfly valve with overall water-tight rubber lining is introduced. (Kako, I.)

  3. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  4. Safety aspects of station blackout at nuclear power plants

    International Nuclear Information System (INIS)

    1985-03-01

    The principal focus of this report is on existing light water reactor nuclear power plants. However, many of the considerations discussed herein can be equally applied to new plants, i.e. those not yet in construction. This report is organized to provide a description of design and procedural factors which safety assessments and reviews of operating experience have shown to be important. These are divided into the off-site power system, the on-site AC power systems and alternate (or nearby) sources of power. The latter may be used in the unlikely event that both normal off-site and on-site sources fail. It must be emphasized that first priority should be placed on designing and maintaining high reliability of both the off-site and on-site AC power systems. This basic concept also applies to the capabilities for restoring power sources which failed and making use of all available alternative and nearby power sources during an emergency, to restore AC power in a prompt manner. Discussions on these aspects are provided in chapters 2 and 3 of this report. Because the expected event frequency and associated confidence in such estimations of station blackout are uncertain, preparations should be made to deal with a station blackout. The nature of those preparations, whether they be optimizing emergency procedures to use existing equipment, modifying this equipment to enhance capabilities, or adding new components or systems to cope with station blackout, must be made in light of plant-specific assessments and regulatory safety philosophies/requirements. Discussions on these matters are provided in chapter 4. General and specific conclusions and recommendations are provided in chapter 5. Appendix A provides a description of several case studies on station blackout and loss of off-site power. Abstracts of papers and presentations are provided in Appendix B with authors and affiliations identified to facilitate personal contact. The References and Bibliography contain a

  5. Operator Station Design System - A computer aided design approach to work station layout

    Science.gov (United States)

    Lewis, J. L.

    1979-01-01

    The Operator Station Design System is resident in NASA's Johnson Space Center Spacecraft Design Division Performance Laboratory. It includes stand-alone minicomputer hardware and Panel Layout Automated Interactive Design and Crew Station Assessment of Reach software. The data base consists of the Shuttle Transportation System Orbiter Crew Compartment (in part), the Orbiter payload bay and remote manipulator (in part), and various anthropometric populations. The system is utilized to provide panel layouts, assess reach and vision, determine interference and fit problems early in the design phase, study design applications as a function of anthropometric and mission requirements, and to accomplish conceptual design to support advanced study efforts.

  6. User Context Aware Base Station Power Flow Model

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2005-01-01

    At present the testing of power amplifiers within base station transmitters is limited to testing at component level as opposed to testing at the system level. While the detection of catastrophic failure is possible, that of performance degradation is not. This paper proposes a base station model with respect to transmitter output power with the aim of introducing system level monitoring of the power amplifier behaviour within the base station. Our model reflects the expe...

  7. Increasing the efficiency of thermal power stations

    International Nuclear Information System (INIS)

    Schwarz, N.F.

    1984-01-01

    High energy prices and an increased investment of costs in power plants as well as the necessity to minimize all kinds of environmental pollution have severe consequences on the construction and operation of thermal power stations. One of the most promising measures to cope with the mentioned problems is to raise the thermal efficiency of power plants. With the example of an Austrian electric utility it can be shown that by application of high efficiency combined cycles primary energy can be converted into electricity in a most efficient manner. Excellent operating experience has proved the high reliability of these relatively complex systems. Raising the temperature of the gas topping process still higher will not raise the efficiency considerably. In this respect a Rankine cycle is superior to a Brayton cycle. In a temperature range of 850 to 900 0 C were conventional materials with known properties can still be used, only the alkali metals cesium and potassium have the necessary physical and thermodynamic properties for application in Rankine topping cycles. Building on experience gained in the Fast Breeder development and from the US space program, a potassium topping cycle linked to a conventional water steam cycle with an intermediate diphenyl vapour cycle has been proposed which should give thermal efficiencies in excess of 50%. In a multi-national program this so called Treble Rankine Cycle is being investigated under the auspices of the International Energy Agency. Work is in progress to investigate the technical and economic feasibility of this energy conversion system. Experimental investigations are already under way in the Austrian Research Center Seibersdorf where high temperature liquid metal test facilities have been operated since 1968. (Author)

  8. On the development of small nuclear power stations

    International Nuclear Information System (INIS)

    Goetzmann, C.A.

    1989-01-01

    There are weighty reasons for and against the building of small nuclear power stations. Factors such as specific investment costs, opportunities for and areas of application, geographical conditions as well as those relating to infrastructure, security and availability play an important role in the planning, construction and running of a nuclear power station. For the usual large power stations, the comparatively low specific investment costs and a proven technology are favorable factors which minimize the investment risk. The article presents an overview of reasons for using small power stations and also considers the difficulties which would arise in practice. (orig.) [de

  9. Work place regulations - effects on power station construction

    International Nuclear Information System (INIS)

    Richter, E.

    1979-01-01

    The paper describes that the Workplace Order and Workplace Regulations cannot be applied in every area of a conventional power station or the conventional sections of nuclear power stations. In any case extensive regulations already exist for the hot regions of nuclear power stations. A proposal is made as to which areas of power stations should be developed in accordance with the Workplace Order and the Workplace Regulations and which areas are not deemed to be 'Workplaces'. This is illustrated with the aid of typical examples. (orig.) [de

  10. Simulation of a pressurized-water nuclear power station

    International Nuclear Information System (INIS)

    Larminaux, Robert; Ourmann, Michel

    1978-01-01

    Faced with the large programme of fitting out PWR nuclear power stations, Electricite de France have undertaken a series of studies with a view to ensuring the best possible adaptation of the secondary part -particularly the feed water heating section- to the nuclear boiler. In order to undertake such studies it has been necessary to finalize simulation models of the entire power station. So as to verify the validity of the models, experiment-calculation comparisons were made during transient operating states recorded at the Ardennes power station as well as during starting up trials at the Tihange I power station [fr

  11. Modern power station practice incorporating modern power system practice

    CERN Document Server

    Reynolds, PM

    1992-01-01

    This volume contains two additional features which enhance the value of Modern Power Station Practice as a whole: a cumulative subject index and a detailed list of tables of contents for the entire work. The cumulative index provides access to the vast body of information presented in the set, and also indicates at a glance the breadth and depth of the treatment through the use of inclusive page ranges for major topics. In order to allow the reader the greatest flexibility in using the index there are many cross-references. The entries themselves are qualified by up to two descriptive subheadi

  12. Multivariable control in nuclear power stations

    International Nuclear Information System (INIS)

    Parent, M.; McMorran, P.D.

    1982-12-01

    Linear, state-space models of power plant systems tend to be of high order, leading to difficulties in the design of control systems by state-space methods. However, the control system has access only to the plant inputs and outputs, and the fast-responding internal variables may be masked by slower, dominant variables. Model order reduction applies modal analysis to eliminate the fast modes while retaining the character of the input-output response. Two alternative techniques are presented and demonstrated on a model of a nuclear steam generator. The preferred method is implemented in MVPACK, the computer-aided design package

  13. Nuclear power station - a living organism

    International Nuclear Information System (INIS)

    Stedry, B.

    1993-01-01

    The ABB-ZPA present here a very clear electronic scheme of the well know type I n =I cosφ (not the whole U.Icosφ product) in the typical modular design and respecting every demand. Very peculiar tests on running-down reactor and his power scheme proved that the simplified I.cosφ measuring was giving on the big asynchron motors practically the same decisions as the original mechanical induction relay. 2 figs

  14. High pressure axial flow fans for modern coal power stations

    Energy Technology Data Exchange (ETDEWEB)

    Cyrus, Vaclav [AHT Energetika s.r.o., Praha (Czech Republic); Koci, Petr [ZVVZ Milevsko a.s. (Czech Republic)

    2008-07-01

    Brown coal fired power stations, located in Northern Bohemia, have mostly older boiler blocks with an output of 110 and 200 MWe. Flue gases are cleaned by the desulphurization plants installed between 1993 and 1997. Usually, each boiler block has two air fans and one to three flue gas fans. Flue gas fans operate in severe conditions; fan blades should be resistant to the flue gases containing sulphur and acid drops with the operating temperature at 170 C to 190 C. Additionally, flue gas also often contains ash particles. Currently, some boiler blocks are gradually being refurbished. New blocks with an electrical power output of 600 to 700 MWe are at the design stage. Submitted paper shows our design study of one stage axial flow fan for the new blocks. Results from the new aerodynamic research of the axial flow stages were used in the fan design. (orig.)

  15. Retrofit of new digital control systems in existing power stations

    International Nuclear Information System (INIS)

    Smith, J.E.; Baird, C.F.

    1986-01-01

    With the notable exception of the Canadian CANDU nuclear power stations, little use has been made of digital control in North American nuclear stations. Recently, however, there has been renewed interest in such systems within the nuclear industry in response to demands for better ergonomics in control room design and the obsolescence of control equipment whose fundamental design has changed little in 20 yr. Early in 1985, Atomic Energy of Canada Limited was asked by New Brunswick Power to advise on the redesign of the control systems for two fossil-fired generating stations, Coleson Cove and Courtenay Bay Unit 4. Coleson Cove is to be converted from oil to coal firing with consequent extensive control system changes and Courtenay Bay Unit 4 required a low-cost solution to the problem of relocating its control room from the existing isolated location to the combined control center used by units 1, 2, and 3. In both cases, the recommended solution involves the retrofit of state-of-the-art digital control systems. Although the units involved are nonnuclear the experience is applicable

  16. Feasibility study on floating nuclear power station

    International Nuclear Information System (INIS)

    Kajima, Ryoichi

    1987-01-01

    It is stipulated that nuclear power plants are to be built on solid rock bases on land in Japan. However, there are a limited number of appropriate siting grounds. The Central Research Institute of Electric Power Industry has engaged since 1981 in the studies on the construction technology of power plants, aiming at establishing new siting technology to expand the possible siting areas for nuclear power plants. Underground siting is regarded as a proven technology due to the experience in underground hydroelectric power plants. The technology of siting on quaternary ground is now at the stage of verification. In this report, the outline of floating type offshore/inshore siting technology is introduced, which is considered to be feasible in view of the technical and economical aspects. Three fixed structure types were selected, of which the foundations are fixed to seabed, plant superstructures are above sea surface, and which are floating type. Aiming at ensuring the aseismatic stability of the plant foundations, the construction technology is studied, and the structural concept omitting buoyancy is possible. The most practical water depth is not more than 20 m. The overall plant design, earthquake isolation effect and breakwater are described. (Kako, I.)

  17. 47 CFR 74.793 - Digital low power TV and TV translator station protection of broadcast stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... DISTRIBUTIONAL SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.793 Digital low power TV and TV translator station protection of broadcast stations. (a) An application to construct a new digital low power...

  18. Electric motorcycle charging station powered by solar energy

    Science.gov (United States)

    Siriwattanapong, Akarawat; Chantharasenawong, Chawin

    2018-01-01

    This research proposes a design and verification of an off-grid photovoltaic system (PVS) for electric motorcycle charging station to be located in King’s Mongkut’s University of Technology Thonburi, Bangkok, Thailand. The system is designed to work independently (off-grid) and it must be able to fully charge the batteries of a typical passenger electric motorcycle every evening. A 1,000W Toyotron electric motorcycle is chosen for this study. It carries five units of 12.8V 20Ah batteries in series; hence its maximum energy requirement per day is 1,200Wh. An assessment of solar irradiation data and the Generation Factor in Bangkok, Thailand suggests that the charging system consists of one 500W PV panel, an MPPT charge controller, 48V 150Ah battery, a 1,000W DC to AC inverter and other safety devices such as fuses and breakers. An experiment is conducted to verify the viability of the off-grid PVS charging station by collecting the total daily energy generation data in the raining season and winter. The data suggests that the designed off-grid solar power charging station for electric motorcycle is able to supply sufficient energy for daily charging requirements.

  19. Solar dynamic power module design

    Science.gov (United States)

    Secunde, Richard R.; Labus, Thomas L.; Lovely, Ronald G.

    1989-01-01

    Studies have shown that the use of solar dynamic (SD) power for the growth areas of the Space Station Freedom program will result in life cycle cost savings when compared to power supplied by photovoltaic sources. In the SD power module, a concentrator collects and focuses solar energy into a heat receiver which has integral thermal energy storage. A Power Conversion Unit (PCU) based on the closed Brayton cycle removes thermal energy from the receiver and converts that energy to electrical energy. Since the closed Brayton cycle is a single phase gas cycle, the conversion hardware (heat exchangers, turbine, compressor, etc.) can be designed for operation in low earth orbit, and tested with confidence in test facilities on earth before launch into space. The concentrator subassemblies will be aligned and the receiver/PCU/radiator combination completely assembled and charged with gas and cooling liquid on earth before launch to, and assembly on, orbit.

  20. Report on the accident at the Chernobyl Nuclear Power Station

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents the compilation of information obtained by various organizations regarding the accident (and the consequences of the accident) that occurred at Unit 4 of the nuclear power station at Chernobyl in the USSR on April 26, 1986. The various authors are identified in a footnote to each chapter. An overview of the report is provided. Very briefly the other chapters cover: the design of the Chernobyl nuclear station Unit 4; safety analyses for Unit 4; the accident scenario; the role of the operator; an assessment of the radioactive release, dispersion, and transport; the activities associated with emergency actions; and information on the health and environmental consequences from the accident. These subjects cover the major aspects of the accident that have the potential to present new information and lessons for the nuclear industry in general

  1. Cooperating expert systems for space station power distribution management

    International Nuclear Information System (INIS)

    Nguyen, T.A.; Chiou, W.C.

    1986-01-01

    In a complex system such as the manned Space Station, it is deemed necessary that many expert systems must perform tasks in a concurrent and cooperative manner. An important question to arise is: what cooperative-task-performing models are appropriate for multiple expert systems to jointly perform tasks. The solution to this question will provide a crucial automation design criteria for the Space Station complex systems architecture. Based on a client/server model for performing tasks, the authors have developed a system that acts as a front-end to support loosely-coupled communications between expert systems running on multiple Symbolics machines. As an example, they use the two ART*-based expert systems to demonstrate the concept of parallel symbolic manipulation for power distribution management and dynamic load planner/scheduler in the simulated Space Station environment. This on-going work will also explore other cooperative-task-performing models as alternatives which can evaluate inter and intra expert system communication mechanisms. It will serve as a testbed and a bench-marking tool for other Space Station expert subsystem communication and information exchange

  2. Cooperating Expert Systems For Space Station Power Distribution Management

    Science.gov (United States)

    Nguyen, T. A.; Chiou, W. C.

    1987-02-01

    In a complex system such as the manned Space Station, it is deem necessary that many expert systems must perform tasks in a concurrent and cooperative manner. An important question arise is: what cooperative-task-performing models are appropriate for multiple expert systems to jointly perform tasks. The solution to this question will provide a crucial automation design criteria for the Space Station complex systems architecture. Based on a client/server model for performing tasks, we have developed a system that acts as a front-end to support loosely-coupled communications between expert systems running on multiple Symbolics machines. As an example, we use two ART*-based expert systems to demonstrate the concept of parallel symbolic manipulation for power distribution management and dynamic load planner/scheduler in the simulated Space Station environment. This on-going work will also explore other cooperative-task-performing models as alternatives which can evaluate inter and intra expert system communication mechanisms. It will be served as a testbed and a bench-marking tool for other Space Station expert subsystem communication and information exchange.

  3. Human reliability analysis of Lingao Nuclear Power Station

    International Nuclear Information System (INIS)

    Zhang Li; Huang Shudong; Yang Hong; He Aiwu; Huang Xiangrui; Zheng Tao; Su Shengbing; Xi Haiying

    2001-01-01

    The necessity of human reliability analysis (HRA) of Lingao Nuclear Power Station are analyzed, and the method and operation procedures of HRA is briefed. One of the human factors events (HFE) is analyzed in detail and some questions of HRA are discussed. The authors present the analytical results of 61 HFEs, and make a brief introduction of HRA contribution to Lingao Nuclear Power Station

  4. Reload shutdown for Nuclear Power Stations in spain in 2003

    International Nuclear Information System (INIS)

    2004-01-01

    Regarding time reductions in fuel reloading at Spanish nuclear power stations, the Spanish Nuclear Security Council (CSN), at the request of the Spanish Finance and Treasury Department of the Chamber of Deputies, delivered an instruction, by which power station's owners were urged to establish a detailed planning of reload operations. This article includes the results of this instruction. (Author) 6 refs

  5. Ash Deposition Trials at Three Power Stations in Denmark

    DEFF Research Database (Denmark)

    Laursen, Karin; Frandsen, Flemming; Larsen, Ole Hede

    1998-01-01

    Six full-scale trials were conducted at three power stations in Denmark: Ensted, Funen, and Vendsyssel power stations. During these trials, pulverized coal, bottom ash, fly ash, and deposits from cooled probes were sampled and analyzed with various techniques. On the basis of SEM analyses...

  6. The structural integrity safety case for Sizewell B power station

    International Nuclear Information System (INIS)

    Gerachty, J.E.

    1993-01-01

    This paper presents the safety case approach adopted for the components of the Sizewell 'B' Power Station for which a high degree of structural integrity is required. Such components include the Reactor Pressure Vessel, Steam Generator and Pressuriser for which Incredibility of Failure is claimed. The two parts of the case involve achievement and demonstration of integrity. This is achieved by extensive measures involving design, manufacture, materials and inspection. The demonstration has required a fracture mechanics approach. The specific role of inspection validation and its relation to critical defect size is described. (author)

  7. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Vignes, A.

    1983-02-01

    Evidence is presented to show how the integrity of the reactor pressure vessel to be constructed for the proposed Sizewell B nuclear power station could be achieved by the French company Framatome. Following a description of the organization and experience of Framatome, their ability to manufacture the pressure vessel to the preferred design and to meet all the requirements of the National Nuclear Corporation is demonstrated. Then it is shown, using examples, how the various procurement and fabrication operations are carried out and controlled and how the quality of the materials and products is assessed and guaranteed. (U.K.)

  8. U.S. Central Station Nuclear Power Plants: operating history

    International Nuclear Information System (INIS)

    1976-01-01

    The information assembled in this booklet highlights the operating history of U. S. Central Station nuclear power plants through December 31, 1976. The information presented is based on data furnished by the operating electric utilities. The information is presented in the form of statistical tables and computer printouts of major shutdown periods for each nuclear unit. The capacity factor data for each unit is presented both on the basis of its net design electrical rating and its net maximum dependable capacity, as reported by the operating utility to the Nuclear Regulatory Commission

  9. Advances in commercial heavy water reactor power stations

    International Nuclear Information System (INIS)

    Brooks, G.L.

    1987-01-01

    Generating stations employing heavy water reactors have now firmly established an enviable record for reliable, economic electricity generation. Their designers recognize, however, that further improvements are both possible and necessary to ensure that this reactor type remains attractively competitive with alternative nuclear power systems and with fossil-fuelled generation plants. This paper outlines planned development thrusts in a number of important areas, viz., capital cost reduction, advanced fuel cycles, safety, capacity factor, life extension, load following, operator aida, and personnel radiation exposure. (author)

  10. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Harrison, J.R.

    1982-11-01

    An overview is given of the Safety Case for the Sizewell B nuclear power station as presented in the Pre-Construction Safety Report. Information which has been made available since its publication is included. Safety is considered for normal operation of the reactor and under fault conditions. Faults considered are those due to external hazards such as earthquakes, extreme weather conditions and aircraft crashes, internal hazards such as fire and missiles and reactor faults. Reactor fault studies described include transient analyses of pressurised faults and of loss-of-coolant accidents and the evaluation of the radiological consequences of design basis faults. (U.K.)

  11. Development of heavy load carrying vehicle for nuclear power station

    International Nuclear Information System (INIS)

    Terabayashi, Yasuharu; Oono, Hiroo; Aizu, Takao; Kawaguchi, Kaname; Yamanaka, Masayuki; Hirobe, Tamio; Inagaki, Yoshiaki.

    1985-01-01

    In nuclear power stations, in order to carry out sound and stable operation, the routine inspection and regular inspection of machinery and equipment are performed, therefore, the transportation of heavy things is frequently carried out. Especially, the transportation of heavy things over the steps of passages and stairs requires much labor. Therefore, Chubu Electric Power Co., Inc. and Chubu Plant Service Co., Ltd. carried out the research on the development of a vehicle for transporting heavy components of nuclear power plants. In this research, it was aimed at developing a vehicle which can carry heavy components and get over a step, climb and descend stairs, and run through a narrow passage having many curves as well as running on flat ground. For this purpose, the actual state of the transportation of heavy things was investigated during the regular inspection of a nuclear power station, and on the basis of this results, a prototype vehicle was made and tested. Thereafter, a transporting vehicle of actual scale was made and tested. The investigation of actual state and the examination of the fundamental concept, the design, trial manufacture and verifying test are reported. (Kako, I.)

  12. Station power supply by residual steam of Fugen

    Energy Technology Data Exchange (ETDEWEB)

    Kamiya, Y.; Kato, H.; Hattori, S. (Power Reactor and Nuclear Fuel Development Corp., Tokyo (Japan))

    1981-09-01

    In the advanced thermal reactor ''Fugen'', when the sudden decrease of load more than 40% occurs due to the failure of power system, the turbine regulating valve is rapidly shut, and the reactor is brought to scrum. However, the operation of turbo-generators is continued with the residual steam in the reactor, and the power for inside the station is supplied for 30 sec by the limiting timer, then the power-generating plant is automatically stopped. The reasons why such design was adopted are to reduce manual operation at the time of emergency, to continue water supply for cooling the reactor and to maintain the water level in the steam drum, and to reduce steam release from the safety valve and the turbine bypass valve. The output-load unbalance relay prevents the everspeed of the turbo-generator when load decreased suddenly, but when the failure of power system is such that recovers automatically in course of time, it does not work. The calculation for estimating the dynamic characteristics at the time of the sole operation within the station is carried out by the analysis code FATRAC. The input conditions for the calculation and the results are reported. Also the dynamic characteristics were actually tested to confirm the set value of the limiting timer and the safe working of turbine and generator trips. The estimated and tested results were almost in agreement.

  13. Sustainable Power Supply Solutions for Off-Grid Base Stations

    Directory of Open Access Journals (Sweden)

    Asma Mohamad Aris

    2015-09-01

    Full Text Available The telecommunication sector plays a significant role in shaping the global economy and the way people share information and knowledge. At present, the telecommunication sector is liable for its energy consumption and the amount of emissions it emits in the environment. In the context of off-grid telecommunication applications, off-grid base stations (BSs are commonly used due to their ability to provide radio coverage over a wide geographic area. However, in the past, the off-grid BSs usually relied on emission-intensive power supply solutions such as diesel generators. In this review paper, various types of solutions (including, in particular, the sustainable solutions for powering BSs are discussed. The key aspects in designing an ideal power supply solution are reviewed, and these mainly include the pre-feasibility study and the thermal management of BSs, which comprise heating and cooling of the BS shelter/cabinets and BS electronic equipment and power supply components. The sizing and optimization approaches used to design the BSs’ power supply systems as well as the operational and control strategies adopted to manage the power supply systems are also reviewed in this paper.

  14. Development situation about the Canadian CANDU Nuclear Power Generating Stations

    Energy Technology Data Exchange (ETDEWEB)

    Jeon, Yu Mi; Kim, Yong Hee; Park, Joo Hwan

    2009-07-15

    The CANDU reactor is the most versatile commercial power reactor in the world. The acronym 'CANDU', a registered trademark of Atomic Energy of Canada Limited, stands for 'CANada Deuterium Uranium'. CANDU uses heavy water as moderator and uranium (originally, natural uranium) as fuel. All current power reactors in Canada are of the CANDU type. Canada exports CANDU type reactor in abroad. CANDU type is used as the nuclear power plants to produce electrical. Today, there are 41 CANDU reactors in use around the world, and the design has continuously evolved to maintain into unique technology and performance. The CANDU-6 power reactor offers a combination of proven, superior and state-of-the-art technology. CANDU-6 was designed specifically for electricity production, unlike other major reactor types. One of its characteristics is a very high operating and fuel efficiency. Canada Nuclear Power Generating Stations were succeeded in a commercial reactor of which the successful application of heavy water reactor, natural uranium method and that on-power fuelling could be achieved. It was achieved through the joint development of a major project by strong support of the federal government, public utilities and private enterprises. The potential for customization to any country's needs, with competitive development and within any level of domestic industrial infrastructure, gives CANDU technology strategic importance in the 21st century.

  15. Development situation about the Canadian CANDU Nuclear Power Generating Stations

    International Nuclear Information System (INIS)

    Jeon, Yu Mi; Kim, Yong Hee; Park, Joo Hwan

    2009-07-01

    The CANDU reactor is the most versatile commercial power reactor in the world. The acronym 'CANDU', a registered trademark of Atomic Energy of Canada Limited, stands for 'CANada Deuterium Uranium'. CANDU uses heavy water as moderator and uranium (originally, natural uranium) as fuel. All current power reactors in Canada are of the CANDU type. Canada exports CANDU type reactor in abroad. CANDU type is used as the nuclear power plants to produce electrical. Today, there are 41 CANDU reactors in use around the world, and the design has continuously evolved to maintain into unique technology and performance. The CANDU-6 power reactor offers a combination of proven, superior and state-of-the-art technology. CANDU-6 was designed specifically for electricity production, unlike other major reactor types. One of its characteristics is a very high operating and fuel efficiency. Canada Nuclear Power Generating Stations were succeeded in a commercial reactor of which the successful application of heavy water reactor, natural uranium method and that on-power fuelling could be achieved. It was achieved through the joint development of a major project by strong support of the federal government, public utilities and private enterprises. The potential for customization to any country's needs, with competitive development and within any level of domestic industrial infrastructure, gives CANDU technology strategic importance in the 21st century

  16. Saving of drinking water in cooling system at Aq aba Thermal Power Station

    International Nuclear Information System (INIS)

    Al-Nsour, A.F.

    2001-01-01

    This paper discussing a new modification, design and implementation to the existing cooling water system of boiler drum continuous blow down water at Aq aba Thermal Power Stations to eliminate drinking water consumption as a coolant medium

  17. The economic consequences of the Sizewell 'B' nuclear power station

    International Nuclear Information System (INIS)

    Fothergill, S.; Gudgin, G.; Mason, N.

    1983-01-01

    The subject is covered in chapters, entitled: introduction (the background to Sizewell 'B'); policy options (Sizewell 'B'; a new coal-fired station; the no-new-station option; a PWR programme); economic framework (direct effects; financing; final macroeconomic effects); the construction phase (capital costs; direct effects; final effects; summary); the operating phase (a new power station as a replacement for older stations; the period of base-load operation; the later years of operation; summary); conclusions and policy recommendations. The first recommendation is that if a new power station is built it should be a coal-fired station rather than a PWR. The second recommendation is that if a new coal station is built there is a case for building it early, ahead of demand. (U.K.)

  18. Electric machinery and drives in thermal power stations. Elektrische Maschinen und Antriebe in thermischen Kraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery.

  19. Space station interior design: Results of the NASA/AIA space station interior national design competition

    Science.gov (United States)

    Haines, R. F.

    1975-01-01

    The results of the NASA/AIA space station interior national design competition held during 1971 are presented in order to make available to those who work in the architectural, engineering, and interior design fields the results of this design activity in which the interiors of several space shuttle size modules were designed for optimal habitability. Each design entry also includes a final configuration of all modules into a complete space station. A brief history of the competition is presented with the competition guidelines and constraints. The first place award entry is presented in detail, and specific features from other selected designs are discussed. This is followed by a discussion of how some of these design features might be applied to terrestrial as well as space situations.

  20. Design of the LBNF Beamline Target Station

    Energy Technology Data Exchange (ETDEWEB)

    Tariq, S. [Fermilab; Ammigan, K. [Fermilab; Anderson, K.; ; Buccellato, S. A. [Fermilab; Crowley, C. F. [Fermilab; Hartsell, B. D. [Fermilab; Hurh, P. [Fermilab; Hylen, J. [Fermilab; Kasper, P. [Fermilab; Krafczyk, G. E. [Fermilab; Lee, A. [Fermilab; Lundberg, B. [Fermilab; Reitzner, S. D. [Fermilab; Sidorov, V. [Fermilab; Stefanik, A. M. [Fermilab; Tropin, I. S. [Fermilab; Vaziri, K. [Fermilab; Williams, K. [Fermilab; Zwaska, R. M. [Fermilab; Densham, C. [RAL, Didcot

    2016-10-01

    The Long Baseline Neutrino Facility (LBNF) project will build a beamline located at Fermilab to create and aim an intense neutrino beam of appropriate energy range toward the DUNE detectors at the SURF facility in Lead, South Dakota. Neutrino production starts in the Target Station, which consists of a solid target, magnetic focusing horns, and the associated sub-systems and shielding infrastructure. Protons hit the target producing mesons which are then focused by the horns into a helium-filled decay pipe where they decay into muons and neutrinos. The target and horns are encased in actively cooled steel and concrete shielding in a chamber called the target chase. The reference design chase is filled with air, but nitrogen and helium are being evaluated as alternatives. A replaceable beam window separates the decay pipe from the target chase. The facility is designed for initial operation at 1.2 MW, with the ability to upgrade to 2.4 MW, and is taking advantage of the experience gained by operating Fermilab’s NuMI facility. We discuss here the design status, associated challenges, and ongoing R&D and physics-driven component optimization of the Target Station.

  1. Thermal battery automated assembly station conceptual design

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, D

    1988-08-01

    Thermal battery assembly involves many operations which are labor- intense. In August 1986, a project team was formed at GE Neutron Devices to investigate and evaluate more efficient and productive battery assembly techniques through the use of automation. The result of this study was the acceptance of a plan to automate the piece part pellet fabrication and battery stacking operations by using computerized pellet presses and robots which would be integrated by a main computer. This report details the conceptual design and development plan to be followed in the fabrication, development, and implementation of a thermal battery automated assembly station. 4 figs., 8 tabs.

  2. Organization of the operating quality in EDF nuclear power stations

    International Nuclear Information System (INIS)

    Stolz, J.

    1976-01-01

    The organization of operating quality in EDF nuclear stations cover a number of planned and systematic actions of technical and management order carried on at station level and Nuclear Safety Department level. Priority is given to safety quality which has to remain the same during the whole life of the stations; the safety of a station depending from its designing, realization and starting up quality on one hand and from its operating methods on the other [fr

  3. Nuclear instrument upgrade at Connecticut Yankee Atomic Power Station

    International Nuclear Information System (INIS)

    Brothers, M.H.; Flynn, B.J.; Shugars, H.G.

    1989-01-01

    After 20 years of commercial operation, the Connecticut Yankee Atomic Power Station decided to replace the original nuclear instrument system. The plant was motivated primarily by reliability and maintainability problems, the former attributed to equipment wearout and discrete component failure, and the latter to the unavailability of qualified spare parts, another effect of the equipment's age. In replacing the system, the plant also had to address current regulatory, design, and plant technical specification requirements, including physical separation, signal isolation, and changes in equipment qualification. This paper discusses the motivation for the system's replacement, the challenges to the plant engineers and equipment designers, the ways in which the new design met the challenges, the test results of the new system, and other potential benefits supported by the test results

  4. Shippingport Atomic Power Station. Quarterly operating report, third quarter 1978

    Energy Technology Data Exchange (ETDEWEB)

    Jones, T. D.

    1978-01-01

    A loss of ac power to the station occurred on July 28, 1978 caused by an interaction between Beaver Valley Power Station and Shippingport Atomic Power Station when the main transformer of Unit No. 1 of the Beaver Valley Power Station developed an internal failure and tripped the BVPS. Two environmental studies were continued this quarter. The first involves reduction of main unit condenser chlorination and the second, river intake screen fish impingement sampling. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. During the third quarter of 1978, 874 cubic feet of radioactive solid waste was shipped out of state for burial. At the end of the quarter, the Fall shutdown continued with the plant heated up, the main turbine on turning gear and plant testing in progress prior to Station startup.

  5. Environmental radiation monitoring system in nuclear power station

    International Nuclear Information System (INIS)

    Matsuoka, Sadazumi; Tadachi, Katsuo; Endo, Mamoru; Yuya, Hiroshi

    1983-01-01

    At the time of the construction of nuclear power stations, prior to their start of operation, the state of environmental radiation must be grasped. After the start of the power stations, based on those data, the system of environmental radiation monitoring is established. Along with the construction of Kashiwazaki-Kariwa Nuclear Power Station, The Tokyo Electric Power Co., Inc. jointly with Fujitsu Ltd. has developed a high-reliability, environmental radiation monitoring system, and adopted ''optical data highways'' using optical fiber cables for communication. It consists of a central monitoring station and 11 telemeter observation points, for collecting both radiation and meteorological data. The data sent to the central station through the highways are then outputted on a monitoring panel. They are analyzed with a central processor, and the results are printed out. (Mori, K.)

  6. Power transmission cable development for the Space Station Freedom electrical power system

    Science.gov (United States)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  7. Review of radioactive discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report is a review of the arisings and concludes that suitable technologies exist, which if applied, could reduce discharges from nuclear power plants in England and Wales in line with the rest of Europe. (author)

  8. Principle simulator for a PWR nuclear power station

    International Nuclear Information System (INIS)

    Wahlstroem, B.

    1975-05-01

    A report is given on a simulator developed for the training of operational and planning staff for the Lovisa nuclear power station in Finland. All main components of the power station are illustrated and trainees can operate the simulator in the power range 3-100 %. The model was originally developed for planning the control system of Lovisa I, for which reason the simulator project could be carried out on a relatively limited budget. (author)

  9. Operating Experience at the Aagesta Nuclear Power Station

    International Nuclear Information System (INIS)

    Sandstroem, S.

    1966-09-01

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW t ) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965

  10. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S [ed.

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  11. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S. (ed.)

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  12. Preoperation of Hamaoka Nuclear Power Station Unit No. 4

    International Nuclear Information System (INIS)

    Fukuyo, Tadashi; Kurata, Satoshi

    1994-01-01

    Chubu Electric Power Co. finished preoperation of Hamaoka Nuclear Power Station Unit No. 4 in September, 1993. Although unit 4 has the same reactor design as unit 3, its rated electrical output (1,137MW) is 37MW more than that of unit 3. This increase was achieved mainly by adopting a Moisture Separater Heater in the turbine system. We started preoperation of unit 4 in November 1992 and performed various tests at electrical outputs of 20%, 50%, 75%, and 100%. We finished preoperation without any scram or other major problems and obtained satisfactory results for the functions and performance of the plant. This paper describes the major results of unit 4 preoperation. (author)

  13. Safety of CANDU nuclear power stations

    International Nuclear Information System (INIS)

    Snell, V.G.

    1978-11-01

    A nuclear plant contains a large amount of radioactive material which could be a potential threat to public health. The plant is therefore designed, built and operated so that the risk to the public is low. Careful design of the normal reactor systems is the first line of defense. These systems are highly resistant to an accident happening in the first place, and can also be effective in stopping it if it does happen. Independent and redundant safety sytems minimize the effects of an accident, or stop it completely. They include shutdown systems, emergency core cooling systems, and containment systems. Massive impairment of any one safety system together with an accident can be tolerated. This 'defence in depth' approach recognizes that men and machines are imperfect and that the unexpected happens. The nuclear power plant need not be perfect to be safe. To allow meaningful judgements we must know how safe the plant is. The Atomic Energy Control Board guidelines give one such measure, but they may overestimate the true risk. We interpret these guidelines as an upper limit to the total risk, and trace their evolution. (author)

  14. Load control on nuclear power station

    International Nuclear Information System (INIS)

    Hattori, Takuya; Tsukuda, Yoshiaki.

    1988-01-01

    Power generation control is required for the nuclear power plants to meet electric power demand. In BWRs, power generation control can be achieved by arranging the coolant flow rate and control rod operation. In PWRs, power generation can be regulated by the control rods automatically controled with the steam valves. As a result of the experiments, it is confirmed that the operational function is normal, and safety of reactor components, pressure vessel and fuel elments are assured. (Katagiri, S)

  15. Argentinian experience in selecting sites for nuclear power stations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    One nuclear power station is in operation in the Republic of Argentina, a second is under construction, and the decision to build a third has been taken. According to existing plans, about ten nuclear power stations should go into operation during the next decade. The present paper analyses the experience acquired in selecting sites for the first units, commenting on the criteria and methods applied, the studies that were carried out, the specific problems encountered and the solutions adopted, as well as on the question of acceptance of the chosen sites by the public. It goes on to describe the current programme of selection and study of sites for future nuclear power stations

  16. Power station impacts: socio-economic impact assessment

    International Nuclear Information System (INIS)

    Glasson, John; Elson, Martin; Barrett, Brendan; Wee, D. Van der

    1987-01-01

    The aim of this study is to assess the local social and economic impacts of a proposed nuclear power station development at Hinkley Point in Somerset. The proposed development, Hinkley Point C, would be an addition to the existing Hinkley Point A Magnox station, commissioned in 1965, and the Hinkley Point B Advanced Gas Cooled Reactor (AGR) station, commissioned in 1976. It is hoped that the study will be of assistance to the CEGB, the Somerset County and District Councils and other agencies in their studies of the proposed development. In addition, the study seeks to apply and further develop the methodology and results from previous studies by the Power Station Impacts (PSI) team for predicting the social and economic effects of proposed power station developments on their localities. (author)

  17. Prospect and problems of gas based power stations of NTPC

    International Nuclear Information System (INIS)

    Suryanarayana, A.

    1993-01-01

    The policy of the Government of India concerning utilisation of natural gas resources of the country has undergone changes over the last few years. The government decided in 1985 to allocate natural gas for power generation and in the year 1986 approved the setting up of the first series of three gas based combined cycle power projects of National Thermal Power Corporation (NTPC). The problems of gas power stations of NTPC are discussed. These are high cost of generation, completion of transmission line works to match with the commissioning of gas power stations, high price of natural gas, and fixation of tariff for sale of power from gas based power stations. (N.B.)

  18. The Chooz power station: ten years of operation

    International Nuclear Information System (INIS)

    Teste du Bailler, Andre

    1977-01-01

    The switching into actual service of the Chooz plant, the first pressurized water reactor ever built in France, occurred on 3rd april 1967. Ten years later, one can establish a highly positive balance schedule of plant's operation whose availability is satisfactory, except the mechanical failure which occurred during the startup. The behavior of the equipment, in particular of the components of the primary loop, was satisfactory in its whole since it allowed the gradual increase in capacity by 15% with respect to the initial design. It allowed also the achievment of noticeable progress in the design of equipment intended for the new power stations. Interesting results have also been obtained in radioprotection, working conditions of the staff and environment protection fields. Finally, the training of the operating teams has been closely followed, whether it concerned the operators directly affected by plant operation or the trainees gathered in a school specially organized for this purpose and transferred since to a training Center [fr

  19. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    McInerny, P.T.

    1982-11-01

    A description is given of the policy and practices that would be adopted in the commissioning, operation and maintenance of the proposed Sizewell B PWR power station. The system of personnel recruitment and training required to staff the station is discussed. (U.K.)

  20. 76 FR 50274 - Terrestrial Environmental Studies for Nuclear Power Stations

    Science.gov (United States)

    2011-08-12

    ... Draft Regulatory Guides in the ``Regulatory Guides'' collection of the NRC's Library at http://www.nrc... Stations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for comment... draft regulatory guide (DG), DG-4016, ``Terrestrial Environmental Studies for Nuclear Power Stations...

  1. Bidding Strategy of Virtual Power Plant with Energy Storage Power Station and Photovoltaic and Wind Power

    Directory of Open Access Journals (Sweden)

    Zhongfu Tan

    2018-01-01

    Full Text Available For the virtual power plants containing energy storage power stations and photovoltaic and wind power, the output of PV and wind power is uncertain and virtual power plants must consider this uncertainty when they participate in the auction in the electricity market. In this context, this paper studies the bidding strategy of the virtual power plant with photovoltaic and wind power. Assuming that the upper and lower limits of the combined output of photovoltaic and wind power are stochastically variable, the fluctuation range of the day-ahead energy market and capacity price is stochastically variable. If the capacity of the storage station is large enough to stabilize the fluctuation of the output of the wind and photovoltaic power, virtual power plants can participate in the electricity market bidding. This paper constructs a robust optimization model of virtual power plant bidding strategy in the electricity market, which considers the cost of charge and discharge of energy storage power station and transmission congestion. The model proposed in this paper is solved by CPLEX; the example results show that the model is reasonable and the method is valid.

  2. Why do we build nuclear power stations

    International Nuclear Information System (INIS)

    Keppler, E.

    1984-01-01

    The author discusses some aspects of interest in the context of opposition to nuclear power in Switzerland. The part played and to be played by nuclear power in Switzerland is discussed, criticisms and objections are countered, the implications of power generation without further nuclear contribution are examined, and requests in certain quarters for a tax on power generation except from alternative sources are rejected. (P.G.R.)

  3. Design of a seismo-acoustic station for Antarctica

    Science.gov (United States)

    Contrafatto, Danilo; Fasone, Rosario; Ferro, Angelo; Larocca, Graziano; Laudani, Giuseppe; Rapisarda, Salvatore; Scuderi, Luciano; Zuccarello, Luciano; Privitera, Eugenio; Cannata, Andrea

    2018-04-01

    In recent years, seismological studies in Antarctica have contributed plenty of new knowledge in many fields of earth science. Moreover, acoustic investigations are now also considered a powerful tool that provides insights for many different objectives, such as analyses of regional climate-related changes and studies of volcanic degassing and explosive activities. However, installation and maintenance of scientific instrumentation in Antarctica can be really challenging. Indeed, the instruments have to face the most extreme climate on the planet. They must be tolerant of very low temperatures and robust enough to survive strong winds. Moreover, one of the most critical tasks is powering a remote system year-round at polar latitudes. In this work, we present a novel seismo-acoustic station designed to work reliably in polar regions. To enable year-round seismo-acoustic data collection in such a remote, extreme environment, a hybrid powering system is used, integrating solar panels, a wind generator, and batteries. A power management system was specifically developed to either charge the battery bank or divert energy surplus to warm the enclosure or release the excess energy to the outside environment. Finally, due to the prohibitive environmental conditions at most Antarctic installation sites, the station was designed to be deployed quickly.

  4. Commerical electric power cost studies. Capital cost addendum multi-unit coal and nuclear stations

    International Nuclear Information System (INIS)

    1977-09-01

    This report is the culmination of a study performed to develop designs and associated capital cost estimates for multi-unit nuclear and coal commercial electric power stations, and to determine the distribution of these costs among the individual units. This report addresses six different types of 2400 MWe (nominal) multi-unit stations as follows: Two Unit PWR Station-1139 MWe Each, Two Unit BWR Station-1190 MWe Each, Two Unit High Sulfur Coal-Fired Station-1232 MWe Each, Two Unit Low Sulfur Coal-Fired Station-1243 MWe Each, Three Unit High Sulfur Coal-Fired Station-794 MWe Each, Three Unit Low Sulfur Coal-Fired Station-801 MWe Each. Recent capital cost studies performed for ERDA/NRC of single unit nuclear and coal stations are used as the basis for developing the designs and costs of the multi-unit stations. This report includes the major study groundrules, a summary of single and multi-unit stations total base cost estimates, details of cost estimates at the three digit account level and plot plan drawings for each multi-unit station identified

  5. Radiation protection organization in Guangdong Nuclear Power Station (GNPS)

    International Nuclear Information System (INIS)

    Yang Maochun

    1993-01-01

    The French way of radiation protection management has been adopted by Guangdong Nuclear Power Station (GNPS) but there are some differences. In this paper author describes radiation protection organization in GNPS, special measures having been taken and the present status

  6. Severe Accident Test Station Design Document

    Energy Technology Data Exchange (ETDEWEB)

    Snead, Mary A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Yan, Yong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howell, Michael [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Keiser, James R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Terrani, Kurt A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    The purpose of the ORNL severe accident test station (SATS) is to provide a platform for evaluation of advanced fuels under projected beyond design basis accident (BDBA) conditions. The SATS delivers the capability to map the behavior of advanced fuels concepts under accident scenarios across various temperature and pressure profiles, steam and steam-hydrogen gas mixtures, and thermal shock. The overall facility will include parallel capabilities for examination of fuels and irradiated materials (in-cell) and non-irradiated materials (out-of-cell) at BDBA conditions as well as design basis accident (DBA) or loss of coolant accident (LOCA) conditions. Also, a supporting analytical infrastructure to provide the data-needs for the fuel-modeling components of the Fuel Cycle Research and Development (FCRD) program will be put in place in a parallel manner. This design report contains the information for the first, second and third phases of design and construction of the SATS. The first phase consisted of the design and construction of an out-of-cell BDBA module intended for examination of non-irradiated materials. The second phase of this work was to construct the BDBA in-cell module to test irradiated fuels and materials as well as the module for DBA (i.e. LOCA) testing out-of-cell, The third phase was to build the in-cell DBA module. The details of the design constraints and requirements for the in-cell facility have been closely captured during the deployment of the out-of-cell SATS modules to ensure effective future implementation of the in-cell modules.

  7. Severe Accident Test Station Design Document

    International Nuclear Information System (INIS)

    Snead, Mary A.; Yan, Yong; Howell, Michael; Keiser, James R.; Terrani, Kurt A.

    2015-01-01

    The purpose of the ORNL severe accident test station (SATS) is to provide a platform for evaluation of advanced fuels under projected beyond design basis accident (BDBA) conditions. The SATS delivers the capability to map the behavior of advanced fuels concepts under accident scenarios across various temperature and pressure profiles, steam and steam-hydrogen gas mixtures, and thermal shock. The overall facility will include parallel capabilities for examination of fuels and irradiated materials (in-cell) and non-irradiated materials (out-of-cell) at BDBA conditions as well as design basis accident (DBA) or loss of coolant accident (LOCA) conditions. Also, a supporting analytical infrastructure to provide the data-needs for the fuel-modeling components of the Fuel Cycle Research and Development (FCRD) program will be put in place in a parallel manner. This design report contains the information for the first, second and third phases of design and construction of the SATS. The first phase consisted of the design and construction of an out-of-cell BDBA module intended for examination of non-irradiated materials. The second phase of this work was to construct the BDBA in-cell module to test irradiated fuels and materials as well as the module for DBA (i.e. LOCA) testing out-of-cell, The third phase was to build the in-cell DBA module. The details of the design constraints and requirements for the in-cell facility have been closely captured during the deployment of the out-of-cell SATS modules to ensure effective future implementation of the in-cell modules.

  8. Safety and exportation of nuclear power stations

    International Nuclear Information System (INIS)

    Coudray, M.; Perrais, J.P.

    1976-01-01

    Safety problems arising from exportation are especially handled through the French exportation of PWR stations. Regulations differ widely from one country to another. However, very large use of American regulations is made and frequently there is a tendency to harden such or such clause in the quotation. Industry must be ready to give satisfaction to such demands of customers. Sometimes also, it is a mere duplication of French stations which is above all looked for. In that case, it is the problem of using French regulations abroad which arises. Desirable changes in examination proceedings are analyzed together with a French regulation effort aiming to make easier the promotion of their use abroad. Finally, safety may be a factor of success for exportation attempts. It is shown how useless some outbiddings may be, but also how, on the contrary, speeding up of research and development effort towards specific safety problems in case of exportation, is to be promoted [fr

  9. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  10. TECHNICAL AND ECONOMICAL COMPARISON OF OVERFLOW DAM VARIANTS AT THE GRODNO WATER-POWER STATION

    Directory of Open Access Journals (Sweden)

    G. G. Krouglov

    2005-01-01

    Full Text Available The paper considers various aspects pertaining to determination of main technical characteristics of water-development projects of water-power stations. Technical and economical characteristics of overflow dams at the Grodno water-power station are compared in the paper.The paper contains results of model investigations of two-tier overflow dam which is included in composition of the Grodno water-power station and presents methodology for calculation of pool integration behind two-tier dam which has been developed at the water-development and power engineering department. This methodology makes it possible to determine rate coefficient and compressed depth. In addition to this the paper gives technical and economical comparison of various designs of overflow dams at the Grodno water-power station, analyzes their cost and on the basis of this comparative analysis it is recommended to construct a two-pier dam. 

  11. The plant efficiency of fusion power stations

    International Nuclear Information System (INIS)

    Darvas, J.; Foerster, S.

    1976-01-01

    Due to the circulating energy, lower efficiencies are to be expected with fusion power plants than with nuclear fission power plants. According to the systems analysis, the mirror machine is not very promising as a power plant. The plant efficiency of the laser fusion strongly depends on the laser efficiency about which one can only make speculative statements at present. The Tokamak requires a relatively low circulating energy and is certainly able to compete regarding efficiency as long as the consumption time can be kept large (> 100 sec) and the dead time between the power pulses small ( [de

  12. Planning and preparedness for radiological emergencies at nuclear power stations

    International Nuclear Information System (INIS)

    Thomson, R.; Muzzarelli, J.

    1996-01-01

    The Radiological Emergency Preparedness (REP) Program was created after the March 1979 accident at the Three Mile Island nuclear power station. The Federal Emergency Management Agency (FEMA) assists state and local governments in reviewing and evaluating state and local REP plans and preparedness for accidents at nuclear power plants, in partnership with the US Nuclear Regulatory Commission (NRC), which evaluates safety and emergency preparedness at the power stations themselves. Argonne National Laboratory provides support and technical assistance to FEMA in evaluating nuclear power plant emergency response exercises, radiological emergency plans, and preparedness

  13. Condensate demineralizer system for Fukushima Daiichi Nuclear Power Station, the Tokyo Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Ariyoshi, Shigeki; Ikeda, Yukio; Kuramoto, Kenji; Omori, Yoshi; Yamamoto, Hiroyoshi

    1975-01-01

    This paper describes the condensate demineralizing equipment recently supplied to the second, third, and fifth power units of the Fukushima Daiichi Nuclear Power Station of the Tokyo Electric Power Company, Inc. The output of this equipment is rated as 4,900 m 3 /h each, which is currently the largest capacity for this type of equipment in Japan. The purpose of this equipment is to remove any ion components and suspended solids contained in condensate to improve its water purity. By doing so, decreasing the corrosion rate of materials used in the plant and, at the same time, decreasing the radioactivity of the condensate, thus easing the whole plant operation can be achieved. The same kind of equipment is also employed at the conventional thermal power stations, but the required functioning and operating mode are quite different. In the case of the nuclear power plant, extremely severe requirements specific with nuclear technology must be met which arise solely from dealing with radioactive substances. Not only the water treatment method, but also layout and arrangement, operation and liquid waste processing methods differ from those for the conventional power plants. The equipment for the sixth unit at Fukushima is now under designing and that for the Tokai No.2 unit of the Japan Atomic Power Company is already under shop fabrication. Both have the rated capacity of 7,300 m 3 /h each, which exceeds far up the capacity of the previously mentioned equipment. (auth.)

  14. Simulation of the energy - environment economic system power generation costs in power-stations

    International Nuclear Information System (INIS)

    Weible, H.

    1978-09-01

    The costs of power generation are an important point in the electricity industry. The present report tries to supply a model representation for these problems. The costs of power generation for base load, average and peak load power stations are examined on the basis of fossil energy sources, nuclear power and water power. The methods of calculation where dynamic investment calculation processes are used, are given in the shape of formulae. From the point of view of long term prediction, power generation cost sensitivity studies are added to the technical, economic and energy-political uncertainties. The sensitivity of models for calculations is examined by deterministic and stochastic processes. In the base load and average region, power generation based on nuclear power and water power is economically more favourable than that from fossilfired power stations. Even including subsidies, this cost advantage is not in doubt. In the peak load region, pumped storage power stations are more economic than fossilfired power stations. (orig.) [de

  15. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  16. Main unit electrical protection at Sizewell 'B' power station

    International Nuclear Information System (INIS)

    Fischer, A.; Keates, T.

    1992-01-01

    For any power station, reliable electrical protection of the main generating units (generators plus generator transformers) has important commercial implications. Spurious trips cause loss of generation and consequent loss of revenue, while failure to rapidly isolate a fault leads to unnecessary damage and again, loss of generation and revenue. While these conditions apply equally to Sizewell B there are additional factors to be taken into consideration. A spurious trip of a main generating unit may lead to a trip of the reactor with an associated challenge to the shutdown and core cooling plant. The generator transformers, besides exporting power from the generators to the 400 kV National Grid, also import power from the Grid to the 11 kV Main Electrical System, which in turn is the preferred source of supply to the Essential Electrical System. The Main Unit Protection is designed to clear generator faults leaving this off-site power route intact. Hence failure to operate correctly could affect the integrity of the Essential Electrical Supplies. (Author)

  17. Nuclear power stations. Information paper no. 1. Controls on the building and running of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    1981-09-01

    Controls and constraints which govern the development and running of nuclear power stations are briefly examined. Government policy, permission to build, authority to start building, site acquisition building, running and public opinion are briefly discussed.

  18. Analysis methodology of power generation/cogeneration designs in VNG (Vehicular Natural Gas) stations; Metodologia de analise de projetos de geracao/cogeracao em postos GNV (Gas Natural Veicular)

    Energy Technology Data Exchange (ETDEWEB)

    Romanos, Rafael Reami [Companhia de Gas de Santa Catarina (SCGAS), Florianopolis, SC (Brazil)

    2008-07-01

    This work presents the methodology for analysis of generation/cogeneration projects in NGV filling stations, determining the influence of critical parameters in its technical-economic viability. To achieve this methodology, it was necessary to define parameters that influence directly or indirectly the size of a generating system, as the total electric demand of the filling station, ratio (power of the compressor) / (total installed power), load factor, factor of simultaneity, technical data of major equipment, among others. The methodology has been validated by comparing with data measured in a NGV filling station and allows screening and identifying customers with technical feasibility to evolve in a generation or cogeneration project. The cogeneration with NG generators was highlighted during the analysis of the NGV filling stations and was feasible for establishments which have large thermal demand, as filling stations along the road with large amounts of electric showers in changing rooms. (author)

  19. Station black out of Fukushima Daiichi Nuclear Power Station Unit 1 was not caused by tsunamis

    International Nuclear Information System (INIS)

    Ito, Yoshinori

    2013-01-01

    Station black out (SBO) of Fukushima Daiichi Nuclear Power Station Unit 1 would be concluded to be caused before 15:37 on March 11, 2011 because losses of emergency ac power A system was in 15:36 and ac losses of B system in 15:37 according to the data published by Tokyo Electric Power Co. (TEPCO) in May 10, 2013. Tsunami attacked the site of Fukushima Daiichi Nuclear Power Station passed through the position of wave amplitude meter installed at 1.5 km off the coast after 15:35 and it was also recognized tsunami arrived at the coast of Unit 4 sea side area around in 15:37 judging from a series of photographs taken from the south side of the site and general knowledge of wave propagation. From a series of photographs and witness testimony, tsunami didn't attack Fukushima Daiichi Nuclear Power Station uniformly and tsunami's arrival time at the site of Unit 1 would be far later than arrival time at the coast of Unit 4 sea side area, which suggested it would be around in 15:39. TEPCO insisted tsunami passed through 1.5 km off the coast around in 15:33 and clock of wave amplitude meter was incorrect, which might be wrong. Thus SBO of Fukushima Daiichi Nuclear Power Station Unit 1 occurred before tsunami's arrival at the site of Unit 1 and was not caused by tsunami. (T. Tanaka)

  20. International Space Station Crew Restraint Design

    Science.gov (United States)

    Whitmore, M.; Norris, L.; Holden, K.

    2005-01-01

    With permanent human presence onboard the International Space Station (ISS), crews will be living and working in microgravity, dealing with the challenges of a weightless environment. In addition, the confined nature of the spacecraft environment results in ergonomic challenges such as limited visibility and access to the activity areas, as well as prolonged periods of unnatural postures. Without optimum restraints, crewmembers may be handicapped for performing some of the on-orbit tasks. Currently, many of the tasks on ISS are performed with the crew restrained merely by hooking their arms or toes around handrails to steady themselves. This is adequate for some tasks, but not all. There have been some reports of discomfort/calluses on the top of the toes. In addition, this type of restraint is simply insufficient for tasks that require a large degree of stability. Glovebox design is a good example of a confined workstation concept requiring stability for successful use. They are widely used in industry, university, and government laboratories, as well as in the space environment, and are known to cause postural limitations and visual restrictions. Although there are numerous guidelines pertaining to ventilation, seals, and glove attachment, most of the data have been gathered in a 1-g environment, or are from studies that were conducted prior to the early 1980 s. Little is known about how best to restrain a crewmember using a glovebox in microgravity. In 2004, The Usability Testing and Analysis Facility (UTAF) at the NASA Johnson Space Center completed development/evaluation of several design concepts for crew restraints to meet the various needs outlined above. Restraints were designed for general purpose use, for teleoperation (Robonaut) and for use with the Life Sciences Glovebox. All design efforts followed a human factors engineering design lifecycle, beginning with identification of requirements followed by an iterative prototype/test cycle. Anthropometric

  1. case study of afam power station

    African Journals Online (AJOL)

    NIJOTECH

    documentation system, increased training programme for local manpower, privatization of the electric power ... transmission voltage level ad year of installation. b) .... This has led to a drop in the ... and distribution of electrical Energy Houdder.

  2. Esfas: An information system on worldwide nuclear power stations

    International Nuclear Information System (INIS)

    Melis, M.

    1990-01-01

    While performing the analysis and transcoding of about 30.000 abnormal events happened in nuclear power stations, in the frame of the AORS - Abnormal Occurrences Reporting System project (CEC-Joint Research Centre, Ispra), it was clear to the transcoders (12 nuclear engineers) that, for a good understanding of the true sequence and safety relevance of events, it was necessary to identify the plant layout and the characteristics of safety and auxiliary systems. This exigence, together with the systematic collection of publicly available information (safety reports, utilities descriptions of plants, etc.) was the starting point for the development of ESFAS - Engineered Safety Features and Auxiliary Systems data base, conceived as a tool for the various phases of nuclear plant/system design, up to operational data analysis

  3. Solid radioactive waste management in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Huang Laixi; He Wenxin; Chen Degan

    2004-01-01

    This paper introduces the solid radwaste management system, treatment methods and its continuous improvement during the past 9 years in Guangdong Daya Bay Nuclear Power Station (GNPS). GNPS has paid great attention and made a lot of efforts to implement the principle of waste minimization with source control, improvement of treatment process and strict management, so the output of solid radwastes has annually decreased since 1994. In 2002, the output of solid radwastes in GNPS was 63.5 m 3 , only 50% of 1995 (127 m 3 ), reached the advanced level as the same type NPPs in France. During the period 1994-2002, the accumulated production of solid radwaste Packages in GNPS is 1563.51 m 3 only 18% of the design value; all the packages meet the standard and requirement for safe disposal. Besides, this paper analyzes some new technical processes and presents some proposals for further decreasing the solid radwaste production

  4. Technical evaluation of bids for nuclear power stations

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1976-01-01

    A bid evaluation method is described which, it is claimed, facilitates a distinct and objective judgement of bids, taking into account the importance of the components, systems, and technical aspects evaluated with regard to the operation and safety of a nuclear power station. The evaluation basically consists of a cost assessment of the scope of supply deviations and a numerical evaluation of the technical design, the latter being a particularly novel feature of the method. The logic applied in both processes is shown. Main evaluation criteria which are applied for most components and systems are given as reliability, function and performance, safety, operation and maintenance, and materials. The judgements given to these evaluation criteria form the basis of the numerical bid evaluation described, which is carried out with the aid of computer programs. (U.K.)

  5. Trends of chemical monitoring in power stations

    International Nuclear Information System (INIS)

    Winkler, R.; Venz, H.

    1983-01-01

    Frequently, the state-of-the-art of chemical monitoring in power plants is still determined by conservative methods. A thorough rationalization requires not only modern analytical procedures, but also the consideration of chemically affected processes in complex process analyses and the combination of automatic analyzers with available process computers. Using some examples, ways of reducing monitoring efforts without impairing safety and economy of nuclear power plant operation are pointed out. (author)

  6. Core power distribution measurement and data processing in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Zhang Hong

    1997-01-01

    For the first time in China, Daya Bay Nuclear Power Station applied the advanced technology of worldwide commercial pressurized reactors to the in-core detectors, the leading excore six-chamber instrumentation for precise axial power distribution, and the related data processing. Described in this article are the neutron flux measurement in Daya Bay Nuclear Power Station, and the detailed data processing

  7. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    Science.gov (United States)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  8. Environmental impact of nuclear power stations

    International Nuclear Information System (INIS)

    Kellermann, O.; Balfanz, H.P.

    1975-01-01

    Following a comparative consideration of the present and future environmental impact by coal, oil, and nuclear power plants, the special risks connected with the use of the latter are dealt with. A distinction is made in considering the risk between public exposure, in the environment of a plant due to operational leakage and radiation exposure in the plant under normal operation and in the case of an accident. The accident risk consideration is the basis of the Rasmussen study where the different containment construction of german plants as well as the higher population density for sites in the FRG are considered. Evaluation parameters are given to quantify the risks and using this, the risks of various cases of impact of nuclear power plants are compared. The comparison shows that the risks of nuclear power plant operation according to the value in normal operation are comparable to those in the case of an accident. (ORU/LH) [de

  9. Present trends in HVDC converter station design

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Lennart; Asplund, Gunnar; Bjorklund, Hans; Flisberg, Gunnar [ABB Power Systems AB, Ludvika (Sweden)

    1994-12-31

    HVDC converter station technology has developed rapidly to satisfy increasing requirements during past 10 - 15 years, but there has not been any dramatic changes since thyristor valves were introduced in the mid 70s. This paper describes some recent and expected future developments, that will substantiality change and simplify future converter stations. (author) 4 refs., 7 figs.

  10. Environmental implications of fossil-fuelled power stations

    International Nuclear Information System (INIS)

    Robson, A.

    1979-01-01

    The public health and environmental implications of electricity generation by fossil-fuelled power stations are discussed with respect to pollutant emission and the disposal of waste products. The following conclusions were deduced. The policy of using tall chimney stacks has ensured that acceptable concentrations of potential pollutants are observed in the vicinity of power stations. Large scale carbon dioxide emission may represent a problem in the future due to its effect on the climate. The effects of sulphur dioxide and the oxides of nitrogen need to be kept under review but it is likely that sources other than power stations will be of greater importance in this context. Pulverised fuel ash is a safe and useful by product of power production. Finally the radiation dose to man caused by the release of naturally occurring radioisotopes is negligible compared to the natural background levels. (UK)

  11. Nuclear power stations and their environmental hazards

    International Nuclear Information System (INIS)

    Jansen, P.

    1975-01-01

    Starting from a consideration of the energy demand up to the year 2000, the author points out the necessity of nuclear power plant operation for electricity generation and discusses the possible danger to human populations. An assessment of the emission rate of radionuclides in nuclear power plant operation and the possible health hazards to the total population is based on a survey of the U.S. EPA of February 1972. The discussion of the accident risk is based on the results of Rasmussen's study of reactor safety. (ORU/AK) [de

  12. Report on the accident at the Chernobyl Nuclear Power Station

    International Nuclear Information System (INIS)

    1987-12-01

    This report presents the compilation of information obtained by various organizations regarding the accident (and the consequences of the accident) that occurred at Unit 4 of the nuclear power station at Chernobyl in the USSR on April 26, 1986. Each organization has independently accepted responsibility for one or more chapters. The specific responsibility of each organization is indicated. The various authors are identified in a footnote to each chapter. Very briefly the other chapters cover: the design of the Chernobyl nuclear station Unit 4; safety analyses for Unit 4; the accident scenario; the role of the operator; an assessment of the radioactive release, dispersion, and transport; the activities associated with emergency actions; and information on the health and environmental consequences from the accident. These subjects cover the major aspects of the accident that have the potential to present new information and lessons for the nuclear industry in general. The task of evaluating the information obtained in these various areas and the assessment of the potential implications has been left to each organization to pursue according to the relevance of the subject to their organization. Those findings will be issued separately by the cognizant organizations. The basic purpose of this report is to provide the information upon which such assessments can be made

  13. Design and development of electric vehicle charging station equipped with RFID

    Science.gov (United States)

    Panatarani, C.; Murtaddo, D.; Maulana, D. W.; Irawan, S.; Joni, I. M.

    2016-02-01

    This paper reports the development of electric charging station from distributed renewable for electric vehicle (EV). This designed refer to the input voltage standard of IEC 61851, plugs features of IEC 62196 and standard communication of ISO 15118. The developed electric charging station used microcontroller ATMEGA8535 and RFID as controller and identifier of the EV users, respectively. The charging station successfully developed as desired features for electric vehicle from renewable energy resources grid with solar panel, wind power and batteries storage.

  14. Physics Experiments at the Agesta Power Station

    International Nuclear Information System (INIS)

    Apelqvist, G.; Bliselius, P. Aa.; Blomberg, P.E.; Jonsson, E.; Aakerhielm, F.

    1966-09-01

    Part A. Dynamic measurements have been performed at the Aagesta reactor at power levels from 0.3 to 65 MW(th). The purposes of the experiments have been both to develop experimental methods and equipment for the dynamic studies and to measure the dynamic characteristics of the reactor in order to check the dynamic model. The experiments have been performed with four different perturbation functions: trapezoidal and step functions and two types of periodic multifrequency signals. Perturbations were introduced in the reactivity and in the load. The recordings were made of the responses of nuclear power, coolant inlet and outlet temperature and control rod position. The results are presented as step responses and transfer functions (Bode diagrams). Inmost cases the relative accuracy is ± 0.5 dB in amplitude and ± 5 deg in phase. The results from the experiments in general show rather good agreement with the results obtained from a dynamic model, which successively has been improved. Experience on reactor noise analysis based on measurements in the Agesta power reactor is discussed. It is shown that the noise measurements have given complementary dynamic information of the reactor. Part B. Static measurements of the physics parameters in the Agesta reactor are carried out to confirm theoretical methods for reactor calculations and to form a good basis for safe operation of the reactor. The reactivity worth of groups of control rods are determined with different methods and compared with calculations with the three-dimensional code HETERO. The excess reactivity as a function of burn up is obtained from the control rod positions. The temperature coefficient of the moderator is measured by lowering the moderator temperature at constant power and observing the change in control rod insertion. As burn up increases the experiments are repeated in order to follow the changes in the coefficient. The xenon poisoning effects are measured by changing the power level and

  15. Physics Experiments at the Agesta Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Apelqvist, G [State Power Board, Stockholm (Sweden); Bliselius, P Aa; Blomberg, P E; Jonsson, E; Aakerhielm, F [AB Atomenergi, Nykoeping (Sweden)

    1966-09-15

    Part A. Dynamic measurements have been performed at the Aagesta reactor at power levels from 0.3 to 65 MW(th). The purposes of the experiments have been both to develop experimental methods and equipment for the dynamic studies and to measure the dynamic characteristics of the reactor in order to check the dynamic model. The experiments have been performed with four different perturbation functions: trapezoidal and step functions and two types of periodic multifrequency signals. Perturbations were introduced in the reactivity and in the load. The recordings were made of the responses of nuclear power, coolant inlet and outlet temperature and control rod position. The results are presented as step responses and transfer functions (Bode diagrams). Inmost cases the relative accuracy is {+-} 0.5 dB in amplitude and {+-} 5 deg in phase. The results from the experiments in general show rather good agreement with the results obtained from a dynamic model, which successively has been improved. Experience on reactor noise analysis based on measurements in the Agesta power reactor is discussed. It is shown that the noise measurements have given complementary dynamic information of the reactor. Part B. Static measurements of the physics parameters in the Agesta reactor are carried out to confirm theoretical methods for reactor calculations and to form a good basis for safe operation of the reactor. The reactivity worth of groups of control rods are determined with different methods and compared with calculations with the three-dimensional code HETERO. The excess reactivity as a function of burn up is obtained from the control rod positions. The temperature coefficient of the moderator is measured by lowering the moderator temperature at constant power and observing the change in control rod insertion. As burn up increases the experiments are repeated in order to follow the changes in the coefficient. The xenon poisoning effects are measured by changing the power level and

  16. Power reactor design trends

    International Nuclear Information System (INIS)

    Hogan, W.J.

    1985-01-01

    Cascade and Pulse Star represent new trends in ICF power reactor design that have emerged in the last few years. The most recent embodiments of these two concepts, and that of the HYLIFE design with which they will compare them, are shown. All three reactors depend upon protecting structural elements from neutrons, x rays and debris by injecting massive amounts of shielding material inside the reaction chamber. However, Cascade and Pulse Star introduce new ideas to improve the economics, safety, and environmental impact of ICF reactors. They also pose different development issues and thus represent technological alternatives to HYLIFE

  17. Mission Analysis for LEO Microwave Power-Beaming Station in Orbital Launch of Microwave Lightcraft

    Science.gov (United States)

    Myrabo, L. N.; Dickenson, T.

    2005-01-01

    A detailed mission analysis study has been performed for a 1 km diameter, rechargeable satellite solar power station (SPS) designed to boost 20m diameter, 2400 kg Micr,oWave Lightcraft (MWLC) into low earth orbit (LEO) Positioned in a 476 km daily-repeating oi.bit, the 35 GHz microwave power station is configured like a spinning, thin-film bicycle wheel covered by 30% efficient sola cells on one side and billions of solid state microwave transmitter elements on the other, At the rim of this wheel are two superconducting magnets that can stor,e 2000 G.J of energy from the 320 MW, solar array over a period of several orbits. In preparation for launch, the entire station rotates to coarsely point at the Lightcraft, and then phases up using fine-pointing information sent from a beacon on-board the Lightcraft. Upon demand, the station transmits a 10 gigawatt microwave beam to lift the MWLC from the earth surface into LEO in a flight of several minutes duration. The mission analysis study was comprised of two parts: a) Power station assessment; and b) Analysis of MWLC dynamics during the ascent to orbit including the power-beaming relationships. The power station portion addressed eight critical issues: 1) Drag force vs. station orbital altitude; 2) Solar pressure force on the station; 3) Station orbital lifetime; 4) Feasibility of geo-magnetic re-boost; 5) Beta angle (i..e., sola1 alignment) and power station effective area relationship; 6) Power station percent time in sun vs, mission elapsed time; 7) Station beta angle vs.. charge time; 8) Stresses in station structures.. The launch dynamics portion examined four issues: 1) Ascent mission/trajecto1y profile; 2) MWLC/power-station mission geometry; 3) MWLC thrust angle vs. time; 4) Power station pitch rate during power beaming. Results indicate that approximately 0 58 N of drag force acts upon the station when rotated edge-on to project the minimum frontal area of 5000 sq m. An ion engine or perhaps an electrodynamic

  18. Physical decommissioning of the Shippingport Atomic Power Station

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy (USDOE), and the turbine-generator and balance of plant which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by USDOE from the Duquesne Light Company. The Shippingport Station Decommissioning Project (SSDP) is being managed for the USDOE by the General Electric Company and its integated subcontractor, Morrison Knudsen-Ferguson (MK-F) Company. The objectives of the Shippingport Station Decommissioning Project (SSDP) are to: Demonstrate the safe and cost effective dismantlement of a large scale nuclear power plant; Provide useful data for future decommissioning projects

  19. Efforts toward enhancing seismic safety at Kashiwazaki Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Yamashita, Kazuhiko

    2009-01-01

    It has been two years since the Niigata-ken Chuetsu-oki Earthquake (NCOE) occurred in 2007. The earthquake brought a major disaster for Kashiwazaki, Kariwa, and the neighboring areas. First of all, we would like to give condolences to people in the devastated area and to pray for the immediate recovery. Our Kashiwazaki Kariwa Nuclear Power Station located in the same area was naturally caught up in the earthquake. The station was hit by a big tremor more than its intensity assumed to be valid at the station design stage. In spite of unexpected tremor, preventive functions for the station safety worked as expected as it designed. Critical facilities designed as high seismic class were not damaged, though considerable damages were seen in outside-facilities designed as low seismic class. We currently make efforts to inspect and recover damages. While we carefully carry out inspection and assessment to make sure the station integrity, we are also going forward restoration as well as construction for seismic safety enhancement in turn. This report introduces details of the following accounts, these are an outline of guidelines for seismic design evaluation that was revised in 2006, a situation at Kashiwazaki Kariwa Nuclear Power Station in the aftermath of the earthquake, and efforts toward enhancing seismic safety that the Tokyo Electric Power Company (TEPCO) has made since the seismic disaster, and our approach to evaluation of facility integrity. (author)

  20. The Creys-Malville Power Station

    International Nuclear Information System (INIS)

    Saitcevsky, B.; Broggiato, A.; Eitz, A.

    1984-01-01

    The Super Phenix 1, a fast neutron reactor of large power, which is under construction as the result of a European Cooperation at the Creys-Malville (Isere) site, enters its last building phase for commissioning in 1984. The main characteristics of the power plant, as also its site are presented. The nuclear boiler is described, and the studies carried on this boiler are briefly given. Then, an outline of the construction and of the installation of the boiler is given. Finally, after a summary of the stages and the lessons learned from the installation, the arrangements made for ensuring the training and the allocation of the operational team which will take over the plant progressively with the help of the tests, are described [fr

  1. Design of earth slide prevention structure and results of analyzing its behavior in excavation work for main building foundation for No.4 plant in Kashiwazaki-Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kuroda, Teruo; Shimazu, Masaomi; Terada, Kenji

    1990-01-01

    In the construction works for No.4 plant in Kashiwazaki-Kariwa Nuclear Power Station, Tokyo Electric Power Co., Inc., the excavation work using ground anchor type earth slide prevention structure of about 30 m height intended for soft rocks was carried out. In this report, the outline of the design of the earth slide prevention structure is described, and based on the results of measurement of the earth slide prevention structure and surrounding ground during the period of the excavation work, the effect that the underground continuous wall normally intersecting with the back of the earth slide prevention wall and structurally separated from it exerted to the deformation behavior of the earth slide prevention wall was examined, and the results are reported. The geological features of the site are explained. The excavation work is to excavate the site of +5 m level down to -26 m for the turbine building and to -38.15 m for the reactor building, and the quantity of earth to be excavated is 1.39 million m 3 . These valuable experiences are utilized for the design and construction of the following plants. (K.I.)

  2. The closed-down nuclear power station

    International Nuclear Information System (INIS)

    Kutscheidt, E.

    1987-01-01

    The author deals with the decision of the Higher Administrative Court of Koblenz of October 6, 1986, in which the immediate execution of the operation licence for the nuclear power plant at Muelheim-Kaerlich is suspended. In his opinion the reasons for the judgement are controversial. But the decision is not subject to appeal, because in this case the Higher Administrative Court is the court of first and last instance. (WG) [de

  3. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  4. Recommended practice for the design of a computer driven Alarm Display Facility for central control rooms of nuclear power generating stations

    International Nuclear Information System (INIS)

    Ben-Yaacov, G.

    1984-01-01

    This paper's objective is to explain the process by which design can prevent human errors in nuclear plant operation. Human factor engineering principles, data, and methods used in the design of computer driven alarm display facilities are discussed. A ''generic'', advanced Alarm Display Facility is described. It considers operator capabilities and limitations in decision-making processes, response dynamics, and human memory limitations. Highlighted are considerations of human factor criteria in the designing and layout of alarm displays. Alarm data sources are described, and their use within the Alarm Display Facility are illustrated

  5. Human-factors engineering control-room design review/audit: Waterford 3 SES Generating Station, Louisiana Power and Light Company

    International Nuclear Information System (INIS)

    Savage, J.W.

    1983-01-01

    A human factors engineering design review/audit of the Waterford-3 control room was performed at the site on May 10 through May 13, 1982. The report was prepared on the basis of the HFEB's review of the applicant's Preliminary Human Engineering Discrepancy (PHED) report and the human factors engineering design review performed at the site. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. The review team was assisted by consultants from Lawrence Livermore National Laboratory (University of California), Livermore, California

  6. ANALYSIS OF SOLAR POWER STATION SCHEMES ON PHOTOELECTRIC MODULES FOR ELECTRIC CARS CHARGING STATIONS

    Directory of Open Access Journals (Sweden)

    A. Hnatov

    2017-12-01

    Full Text Available The analysis of existing schemes for building solar power stations on photoelectric modules with the revealing of their operation principles and functionality has been conducted. The specified technical characteristics of each of the analyzed schemes are given. The structural scheme of the solar charging station for electric cars with determining its functional capabilities and operation features is proposed. The practical application of this scheme will help to reduce the dependence on the general electric power supply network and will create conditions for its total rejection.

  7. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  8. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Playle, M.J.

    1996-01-01

    In-service inspection at Torness Advanced Gas-cooled Reactor is achieved, via penetrations above and below the core area and boilers and through eight circulator penetrations for inspection of the sub-diagrid area. A manipulator is described which can access the area above the reactor core via any of these eight peripheral penetrations. The design and fabrication of the manipulator has led to innovation with a number of possible solutions being tendered. In reactor deployment of the successful design is expected in early 1997. (UK)

  9. Complementary safety evaluation of the Phenix power station (INB n 71) in the light of the Fukushima power station accident

    International Nuclear Information System (INIS)

    2011-01-01

    This report proposes a complementary safety evaluation of the Phenix power station, one of the French basic nuclear installations (BNI, in French INB) in the light of the Fukushima accident. This evaluation takes the following risks into account: risks of flooding, earthquake, loss of power supply and loss of cooling, in addition to operational management of accident situations. It presents some characteristics of the Phenix installation (location, operator, industrial environment, installation characteristics), identifies the risks of cliff effect and the main structures and equipment, evaluates the seismic risk (installation sizing, installation conformity, margin evaluation), evaluates the flooding risk (installation sizing, installation conformity, margin evaluation), briefly examines other extreme natural phenomena (extreme meteorological conditions related to flooding, earthquake or flooding with a higher level than that for which the installation is designed). It analyzes the risk of a loss of power supply and of cooling (loss of external and internal electric sources, loss of the ultimate cooling system). It analyzes the management of severe accidents: crisis management organization, available intervention means, robustness of available means. It discusses the conditions of the use of subcontractors

  10. Complex Mobile Independent Power Station for Urban Areas

    Science.gov (United States)

    Tunik, A. A.; Tolstoy, M. Y.

    2017-11-01

    A new type of a complex mobile independent power station developed in the Department of Engineering Communications and Life-Support Systems of Irkutsk National Research Technical University, is presented in this article. This station contains only solar panel, wind turbine, accumulator, diesel generator and microbial fuel cell for to produce electric energy, heat pump and solar collector to generate heat energy and also wastewater treatment plant and new complex control system. The complex mobile independent power station is intended for full power supply of a different kind of consumers located even in remote areas thus reducing their dependence from centralized energy supply systems, decrease the fossil fuel consumption, improve the environment of urban areas and solve the problems of the purification of industrial and municipal wastewater.

  11. On the troubles happened in nuclear power stations, 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The troubles which happened at the nuclear power stations of Japan in the fiscal year of 1995 are described in this report. The number of troubles in those power stations reported from the corporations of electric industry to Nuclear Safety Commission according to The Law for Regulation of Nuclear Fertile Material, Nuclear Fuel Material and Reactors and Utility Industry Law were 14 in the year and so, the number per reactor was 0.3. The details of the trouble cases were as follows; one and nine cases for automatic and manual shutdowns in operation, respectively and 4 cases found during a down-time of the reactor. But, there was no influence on the environment surrounding those nuclear power stations by the radioactive materials in either of the cases. (M.N.)

  12. The surface physics work station: final design

    International Nuclear Information System (INIS)

    Landers, R.; Kleiman, G.G.; Castro, S.G.C. de; Douglas, R.A.; Nascente, P.A.P.

    1996-01-01

    Thanks to funding from FAPESP we will be installing in the beginning of 1997 a work station for electron spectroscopy designed for the study of clean solid surfaces and the modification of these surfaces by deposition in situ of ultra thin metallic films. The main analytical tool will be a high resolution hemispherical analyzer made by VSW-Omicrom (EA 125 HR) which is capable of better than 5 meV resolution and high transmission due to its five channeltron multi detection system. The system will also have a Rear View LEED Optics for single crystal studies. The system will be housed in a 16'' cylindrical chamber with mu metal magnetic shielding having two levels for analysis. The upper level will contain instruments for technique which do not require photons such as LEED and sample cleaning. The lower level will have the electron analyzer, conventional X-ray source (Al/Mg), electron gun for Auger, e-beam evaporators for thin film deposition and ports for the future addition of different detectors. We will have a manipulator with 5 degrees of freedom (thre translation and two rotational) and sample heating and LN cooling. Finally we will have a fast entry/preparation chamber. The pumping system will have a combination of turbomolecular and ion pumps for the main chamber and a turbo for the fast entr/prep chamber. The system will be used initially for the study of surface alloys by XPS and Photoelectron Diffraction but as soon as it is properly characterized it will be open for collaborations with other groups interested in using its capabilities. (author)

  13. Sodium fires and nuclear power station safety

    International Nuclear Information System (INIS)

    Ivanenko, V.N.; Zubin, A.; Drobyshev, A.V.

    1986-01-01

    The danger of sodium aerosol release at a design basis accident (DBA) of a sodium-cooled fast reactor that involves coolant leakage and burning, is being analyzed. It has been shown that radioactive and toxic releases at DBA do not exceed permissible values. Some means of sodium fire fighting are described. (author)

  14. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  15. Remerschen nuclear power station with BBR pressurized water reactor

    International Nuclear Information System (INIS)

    Hoffmann, J.P.

    1975-01-01

    On the basis of many decades of successful cooperation in the electricity supply sector with the German RWE utility, the Grand Duchy of Luxemburg and RWE jointly founded Societe Luxembourgeoise d'Energie Nucleaire S.A. (SENU) in 1974 in which each of the partners holds a fifty percent interest. SENU is responsible for planning, building and operating this nuclear power station. Following an international invitation for bids on the delivery and turnkey construction of a nuclear power station, the consortium of the German companies of Brown, Boveri and Cie. AG (BBC), Babcock - Brown Boveri Reaktor GmbH (BBR) and Hochtief AG (HT) received a letter of intent for the purchase of a 1,300 MW nuclear power station equipped with a pressurized water reactor. The 1,300 MW station of Remerschen will be largely identical with the Muelheim-Kaerlich plant under construction by the same consortium near Coblence on the River Rhine since early 1975. According to present scheduling, the Remerschen nuclear power station could start operation in 1981. (orig.) [de

  16. Proceedings of scientific-technical seminar: materials investigation for power stations and power grid

    International Nuclear Information System (INIS)

    1994-05-01

    This report is an assembly of the papers concerning the material problems occurring during the exploitation of power stations as well as power grid. The diagnostic methods are also discussed. (author)

  17. Use of expansion joints in power stations

    International Nuclear Information System (INIS)

    Birker; Rommerswinkel.

    1976-01-01

    The paper discusses the mode of action of different systems of expansion joints. Special regard is given to the problems of expansion of pipelines of high rated diameter as employed in today's large power plant turbines. Due to the limited space available, the important role of the spring rate of the bellows for the reaction forces and moments acting on the connection points is pointed out. Apart from this details are given on the fabrication and materials selection of expansion joint bellows, and problems are discussed which arise in connection with the mechanical or hydraulic deformation of bellows with one or more walls. The non-destructive methods now in use for the testing of expansion pipe joints are mentioned along with experiments to test their behaviour under changing loads. The paper concludes on some remarks concerning proper transport, storage and installation of expansion pipe joints. (orig./AK) [de

  18. Thermal power stations and environmental protection

    International Nuclear Information System (INIS)

    Gerking, E.

    1975-01-01

    In this book, the advantages of an optimum cooling concept for waters are compared with the disadvantages of an uncontrolled thermal pollution of waters by waste waters from thermal power plants. The book focuses on the problem of the cost of measures for environmental protection which has not yet received a detailed and complete treatment. The author suggests that perfectionist solutions and superfluos measures be abandoned in favour of a far-reaching, efficient environmental protection concept with a low expenditure of fuel and capital. A detailed treatment is given to false conclusions in the present estimations of the effects of thermal pollution of the waters and to the advantages of freshwater cooling and cooling in general. Also discussed are immission problems and attempts at their solution. (ORU/AK) [de

  19. Daya Bay Nuclear Power Station equipment reliability management system innovation

    International Nuclear Information System (INIS)

    Gao Ligang; Wang Zongjun

    2006-01-01

    Daya Bay Nuclear Power Station has achieved good performance since its commercial operation in 1994. The equipment reliability management system that features Daya Bay characteristics has been established through constant technology introduction, digestion and innovation. It is also based on the success of operational system, equipment maintenance system and technical support system. The system lays a solid foundation for the long-term safe operation of power station. This article emphasizes on the innovation part of equipment reliability management system in Daya Bay. (authors)

  20. Natural radionuclides near a coal-fired power station

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Briggs, J L

    1984-06-15

    An experiment was carried out to measure the specific activity of Pb-210 and Po-210 in livers from cattle that had grazed in a field near Didcot coal-fired power station. Livers from cattle in the Cotswold region were measured for comparison. The specific activities of Pb-210 and Po-210 in soil and grass samples from both areas were also measured at 3-monthly intervals over a year. No statistically significant increases were observed in the Pb-210 and Po-210 levels in liver, soil or grass samples which could be attributed to the operation of the power station.

  1. A Renewably Powered Hydrogen Generation and Fueling Station Community Project

    Science.gov (United States)

    Lyons, Valerie J.; Sekura, Linda S.; Prokopius, Paul; Theirl, Susan

    2009-01-01

    The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

  2. Performance of on-power fuelling equipment at Rajasthan Atomic Power Station

    International Nuclear Information System (INIS)

    Jayabarathan, S.; Gopalakrishnan, S.

    1977-01-01

    Natural uranium reactors on account of their intrinsically low reactivity need frequent refuelling. The Rajasthan Atomic Power Station based on natural uranium reactors has, therefore, been provided with on-power fuel handling system which was installed in 1972. Its performance has met the design intent and operational objectives which are enumerated. However, continuous fuelling 7 to 10 days has not been possible because frequent maintenance of refuelling system is needed on account of certain deficiencies major of which is the heavy water leakage. For better performance, installation of a programmable logic controller is suggested. Mention has also been made of inadequate number of skilled man-power required for maintenance which leads to quick depletion of man-rem of all the available personnel trained for maintenance work. (M.G.B.)

  3. Design methods for high temperature power plant structures

    International Nuclear Information System (INIS)

    Townley, C.H.A.

    1984-01-01

    The subject is discussed under the headings: introduction (scope of paper - reviews of design methods and design criteria currently in use for both nuclear and fossil fuelled power plant; examples chosen are (a) BS 1113, representative of design codes employed for power station boiler plant; (b) ASME Code Case N47, which is being developed for high temperature nuclear reactors, especially the liquid metal fast breeder reactor); design codes for power station boilers; Code Case N47 (design in the absence of thermal shock and thermal fatigue; design against cyclic loading at high temperature; further research in support of high temperature design methods and criteria for LMFBRs); concluding remarks. (U.K.)

  4. Carbon burnout of pulverised coal in power station furnaces

    Energy Technology Data Exchange (ETDEWEB)

    R.I. Backreedy; L.M. Fletcher; J.M. Jones; L. Ma; M. Pourkashanian; A. Williams; K. Johnson; D.J. Waldron; P. Stephenson [University of Leeds, Leeds (United Kingdom)

    2003-07-01

    The degree of carbon burnout in pulverised fuel fired power stations is important because it is linked with power plant efficiency and coal ash suitability for construction purposes. The use of computational methods to calculate carbon burnout in such systems has been aided by the increasing availability of fast computers and improvements in computational methodologies. Despite recent advances in fluid flow, coal devolatilisation and coal combustion models, the use of CFD methods for detailed design purposes or for the selection of commercial coals is still limited. In parallel, industrial engineering codes, which combine simplified thermal models with advanced coal combustion models, are still undergoing development since they provide economic advantages over detailed CFD analysis. Although the major coal combustion processes are well established, an understanding regarding the role of coal macerals and the influence of ash on the combustion process is still lacking. A successful coal model must be able to handle all the complexities of combustion, from the details of the burner geometry through to the formation of unburnt carbon as well as NOx. The development of such a model is described here.

  5. Boiler recirculation pumps for nuclear power stations - present state of development. Directions for planning, operational experience

    International Nuclear Information System (INIS)

    Mattias, H.B.

    1976-01-01

    Boiler recirculation pumps are important components of modern power stations. The development of large recirculation pumps up to a driving power of 1,500 kW was faced with some problems in meeting the plant requirements. In this paper, the present state of development is dealt with. The development problems in the fields of hydrodynamics, cavitation, corrosion and erosion are dealt with as well as the problems of the design of the casing with regard to thermodynamics and strength. Finally, operational experience with the boiler recirculation pump for 600 MW power stations will be reported on. (orig./AK) [de

  6. Bioremediation for coal-fired power stations using macroalgae.

    Science.gov (United States)

    Roberts, David A; Paul, Nicholas A; Bird, Michael I; de Nys, Rocky

    2015-04-15

    Macroalgae are a productive resource that can be cultured in metal-contaminated waste water for bioremediation but there have been no demonstrations of this biotechnology integrated with industry. Coal-fired power production is a water-limited industry that requires novel approaches to waste water treatment and recycling. In this study, a freshwater macroalga (genus Oedogonium) was cultivated in contaminated ash water amended with flue gas (containing 20% CO₂) at an Australian coal-fired power station. The continuous process of macroalgal growth and intracellular metal sequestration reduced the concentrations of all metals in the treated ash water. Predictive modelling shows that the power station could feasibly achieve zero discharge of most regulated metals (Al, As, Cd, Cr, Cu, Ni, and Zn) in waste water by using the ash water dam for bioremediation with algal cultivation ponds rather than storage of ash water. Slow pyrolysis of the cultivated algae immobilised the accumulated metals in a recalcitrant C-rich biochar. While the algal biochar had higher total metal concentrations than the algae feedstock, the biochar had very low concentrations of leachable metals and therefore has potential for use as an ameliorant for low-fertility soils. This study demonstrates a bioremediation technology at a large scale for a water-limited industry that could be implemented at new or existing power stations, or during the decommissioning of older power stations. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Research on application of knowledge engineering to nuclear power stations

    International Nuclear Information System (INIS)

    Umeda, Takeo; Kiyohashi, Satoshi

    1990-01-01

    Recently, the research on the software and hardware regarding knowledge engineering has been advanced eagerly. Especially the applicability of expert systems is high. When expert systems are introduced into nuclear power stations, it is necessary to make the plan for introduction based on the detailed knowledge on the works in nuclear power stations, and to improve the system repeatedly by adopting the opinion and request of those in charge upon the trial use. Tohoku Electric Power Co. was able to develop the expert system of practically usable scale 'Supporting system for deciding fuel movement procedure'. The survey and analysis of the works in nuclear power stations, the selection of the system to be developed and so on are reported. In No. 1 plant of Onagawa Nuclear Power Station of BWR type, up to 1/3 of the fuel is replaced at the time of the regular inspection. Some fuel must be taken to outside for ensuring the working space. The works of deciding fuel movement procedure, the development of the system and its evaluation are described. (K.I.)

  8. Space Station Freedom electrical power system hardware commonality with the United States Polar Platform

    Science.gov (United States)

    Rieker, Lorra L.; Haraburda, Francis M.

    1989-01-01

    Information is presented on how the concept of commonality is being implemented with respect to electric power system hardware for the Space Station Freedom and the U.S. Polar Platform. Included is a historical account of the candidate common items which have the potential to serve the same power system functions on both Freedom and the Polar Platform. The Space Station program and objectives are described, focusing on the test and development responsibilities. The program definition and preliminary design phase and the design and development phase are discussed. The goal of this work is to reduce the program cost.

  9. Decommissioning of the Shippingport Atomic Power Station

    International Nuclear Information System (INIS)

    LaGuardia, T.S.

    1988-01-01

    The Shippingport reactor was originally designed as a pressurized water reactor and operated for approximately 10 years in that mode. Later, in 1967 it was converted to a light water breeder reactor and continued its operation until 1985, when the reactor was shut down. However, the decommissioning planning for Shippingport was begun in 1979. Detailed engineering and planning was undertaken to look at alternatives for disposal of the reactor vessel, the overall detailed estimated costs, the exposure to the workers and the waste volume generated and to prepare activity specifications for performance of the work. The program scope and component removal are detailed. The scarification of contaminated concrete, building demolition, special tools and equipment needed and work performance data are described. The successful removal of the primary system components and piping has been completed. (author)

  10. Nuclear power stations: environmental surveillance of radioactivity

    International Nuclear Information System (INIS)

    Pellerin, P.

    1972-01-01

    circumstances at a level which is perfectly compatible with public health regulations. Far from constituting a hazard to the public, nuclear facilities can, by virtue of the strictness of the controls to which they are subjected, serve as a model for combating numerous unacceptable conventional pollutants of the environment, the most alarming of which, indeed, nuclear power will undoubtedly cause to disappear in the long run

  11. Way to LWR nuclear power stations taking root

    International Nuclear Information System (INIS)

    Toyota, Masatoshi

    1994-01-01

    In this report, as for BWR nuclear power stations, the countermeasures to initial troubles, the circumstances of making bold start for the improvement and standardization after the remarkable lowering of the rate of operation, the development of A-BWR aiming at the most excellent BWR plant and the effort to reduce the construction cost are looked back, and the opinion on advancing nuclear energy development hereafter is mentioned. As the initial troubles, the thermal fatigue of reactor feedwater nozzles, the cracking of return water nozzles in control rod drive, the damage of fuel elements and others occurred. The circumstances till starting the project of improvement and standardization, and the investigation by the ad hoc committee and the results are reported. The feasibility study on A-BWR was carried out from July, 1978 to October, 1979. The basic design and the research and development for verification and the optimization design were carried out till December, 1985, as the result, the improvement of the plant performance was obtained. The effort for reducing the construction cost was successful. (K.I.)

  12. Lessons drawn from serious accidents in nuclear power stations

    International Nuclear Information System (INIS)

    Kosciusko-Morizet, F.; Tanguy, P.

    1981-01-01

    Taking a number of serious accidents considered to be particularly representative (Windscale, Enrico Fermi, Lucens, Browns Ferry, Three Mile Island and Saint-Laurent-des-Eaux), the paper analyses the conclusions reached in subsequent enquiries and the lessons drawn from them by the responsible authorities. While design problems sometimes come to light, it is much more generally operational safety - problems related to instructions, the training of operators, the man/machine relationship - which appears to be inadequate. The organization of relations between the different partners - builders, operators and safety bodies - likewise gives rise to some observations. Certain measures should be pursued on a broader scale in order to improve our ability to prevent serious accidents: (i) incidents important from the standpoint of safety must be identified; (ii) these incidents must be brought to the knowledge of all partners concerned, in all interested countries; (iii) the lessons drawn from them must be exchanged and compared; and (iv) the lessons must be made generally available in a directly usable form (i.e. as design modifications, changes in instructions and so on). Particular attention must be given to the problems of countries which are embarking on nuclear programmes and which, with a small number of installations, need direct and permanent access to all the lessons drawn from the operation of a large power station park, and must be able to call upon the assistance of teams from outside in the event of an accident. (author)

  13. Fire-side corrosion in power-station boilers

    Energy Technology Data Exchange (ETDEWEB)

    Cutler, A J.B.; Flatley, T; Hay, K A

    1978-10-01

    The steel tubing of a modern power-station boiler operates at up to 650/sup 0/C (a dull red heat) in the very corrosive environment produced by the combustion gases and ash particles. Within the tubes, whose walls are around 5mm thick, 2000 tons of steam are generated per hour at temperatures up to 565/sup 0/C and pressures up to 170 bar. Several forms of metal corrosion may occur on the fireside surface of these tubes and on other boiler components. The designed 20-year operating life of the stainless-steel superheater and reheater tubes can be much reduced at temperatures above 600/sup 0/C by attack from molten salts formed beneath the deposited ash on the upstream tube surfaces. Mild steel evaporator tubes lining the furnace wall may suffer similarly if flame impingement allows the local release of volatile chlorine compounds from coal particles on the tube surface. Uncooled metal components supporting and aligning the boiler tubes may reach 1000/sup 0/C and are particularly susceptible to corrosion. CEGB research effort has been applied to quantify the rate of corrosion and to obtain an understanding of the complex corrosion mechanisms, so that ways of minimizing or preventing their occurrence may be found. These include the optimization of the combustion chemistry, design modifications such as shielding certain vulnerable tubes, and the selection of improved alloys and the use of ''co-extruded'' tubing.

  14. Nuclear power stations in August: information and commentary

    International Nuclear Information System (INIS)

    Rogozhin, Yu.

    1989-01-01

    A summary of events at nuclear power stations in the USSR in August 1989 is given. There were 44 nuclear power units in service which had 9 unplanned shutdowns and 13 unsanctioned power reductions. Gosatomenergonadzor SSSR is also responsible for all research and marine reactors. It is reported that there are currently (1989) six nuclear vessels in the USSR and no major accidents or damage to nuclear steam-generating units on these were reported. On-site inspectors maintain a constant presence at nuclear power stations to supervise operation and make sure safety requirements are enforced. Glasnost is opening up previously forbidden areas to the public to enable it to obtain information to allow objective assessment to be made. (author)

  15. Instructor/Operator Station (IOS) Design Guide.

    Science.gov (United States)

    1988-02-01

    INSTRUTOR /OPERATOR STATION (IOS) AI O...The three functional categories also define three different users in terms of jobs and qualifications (if the functions have been allocated to manual ...function manually (e.g., collect the data S required from schedules, printed course outlines and telephone calls to training and facility managers).

  16. Design process of the feeder canal of the Sarcelle power station; Processus de conception du canal d'amenee de la centrale de la Sarcelle

    Energy Technology Data Exchange (ETDEWEB)

    Mercier, A. [Tecsult Inc., Montreal, PQ (Canada); Denault, C.; Villeneuve, M. [Groupe-Conseil La Salle, La Salle, PQ (Canada)

    2008-07-01

    The Societe d'energie de la Baie James is planning to build a hydroelectric powerhouse at the outlet of the Opinaca Reservoir, beside the existing Sarcelle control structure as part of the Eastmain-1-A-Sarcelle project. The new powerhouse will be equipped with three bulb-type turbine generating units operating under 10,8 metres of rated head for a total installed capacity of 150 MW at the rated design flow of 1,380 m{sup 3}/s. This paper discussed the design of the new powerhouse's headrace canal that was conducted in three phases. First, an initial geometry was developed based on the criterion of maximum flow velocity allowing a stable ice cover, taking into account constructability constraints related to bathymetry. The second phase involved numerical modelling, where 11 alternatives were tested using FLOW-3D software. The particular flow pattern in the reservoir demanded that a 1 km by 1.5 km area upstream from the powerhouse be included in the digital terrain model, in addition to the control structure and the water intake. At the conclusion of that phase, the geometry with the most favourable flow conditions was chosen as a starting point for the scale model tests. Last, the scale model test phase involved a detailed analysis of the hydraulic performance of the alternative choices, as well as exploration of several optimization tracks which lead to the choice of the final geometry. Particular attention was provided to the study of vortex phenomena, since the performance of powerhouses equipped with bulb-type turbine units is vulnerable to vortex problems, given the short distance between the water intake and the units. 3 refs., 2 tabs., 11 figs.

  17. Improved monolithic reinforced concrete construction for nuclear power stations

    International Nuclear Information System (INIS)

    Guenther, P.; Fischer, K.

    1983-01-01

    Experience has shown that in applying monolithic reinforced concrete in nuclear power plant construction the following auxiliary means are useful: measuring sheets in assembling, welding gauges for reaching high tolerance accuracies of prefabricated reinforced concrete members, suitable lining materials, formwork anchorage and formwork release agents, concrete workability agents, mechanized procedures for finishing and assembling. These means were successfully tested in constructing the Greifswald nuclear power station

  18. The glass model of Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Kuttruf, H.; Lemke, W.

    1986-01-01

    The glass model represents the nuclear steam generator system of Muelheim-Kaerlich nuclear power station on a scale of 1:25 and in simplified form, so that the thermohydraulic behaviour in both normal operational and fault conditions can be represented. A set-up time of about one hour results in a helpful aid to instruction. (orig.) [de

  19. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Smedley, G.P.

    1982-11-01

    A description is given of the role of Lloyd's Register of Shipping as Independent Inspection Agency for the primary circuit of the PWR for the proposed Sizewell B power station. Topics discussed include: Lloyd's Register of Shipping and its functions; the Independent Inspection Agency and its functions; fabrication of the reactor pressure vessel; inspection on site at Sizewell. (U.K.)

  20. Incinerators for radioactive wastes in Japanese nuclear power stations

    International Nuclear Information System (INIS)

    Karita, Yoichi

    1983-01-01

    As the measures of treatment and disposal of radioactive wastes in nuclear power stations, the development of the techniques to decrease wastes, to reduce the volume of wastes, to treat wastes by solidification and to dispose wastes has been advanced energetically. In particular, efforts have been exerted on the volume reduction treatment from the viewpoint of the improvement of storage efficiency and the reduction of transport and disposal costs. Incineration as one of the volume reduction techniques has been regarded as the most effective method with large reduction ratio, but it was not included in waste treatment system. NGK Insulators Ltd. developed NGK type miscellaneous solid incinerators, and seven incinerators were installed in nuclear power stations. These incinerators have been operated smoothly, and the construction is in progress in six more plants. The necessity of incinerators in nuclear power stations and the problems in their adoption, the circumstance of the development of NGK type miscellaneous solid incinerators, the outline of the incinerator of Karlsruhe nuclear power station and the problems, the contents of the technical development in NGK, the outline of NGK type incinerators and the features, the outline of the pretreatment system, incinerator system, exhaust gas treatment system, ash taking out system and accessory equipment, the operational results and the performance are described. (Kako, I.)

  1. Present status of maintenance in nuclear power stations

    International Nuclear Information System (INIS)

    Fueki, Kensuke

    1982-01-01

    For nuclear power stations, the improvement of the rate of facility utilization is indispensable. As its means, the shortening of regular inspection period, the adoption of long term cycle operation, the shortening of plant shutdown period by the improvement of the reliability of installed equipment and so on are conceivable. In this paper, the maintenance techniques in nuclear power stations which constitute the basis of reliability improvement are explained. In nuclear power stations, the use of nuclear fuel, accordingly the existence of radioactivity are the remarkable features. At the time of an accident, the nuclear reaction in a reactor must be stopped, and the excessive heat must be removed. The radioactivity in nuclear fuel must not be released outside. The regular inspection of once a year is provided by the law, and routine tests are performed during normal operation. The check-up by operators also is a part of the safety measures. For the early detection of abnormality, the diagnosis system is developed, and the maintenance techniques during operation are examined for being taken into the safety test and standard. The improvement of reliability is attempted by the redundancy of systems. The activity of quality assurance, the organization for the maintenance of nuclear power stations and maintenance works, and the measures to raise the rate of operation are reported. (Kako, I.)

  2. Prospects for solving environmental problems pertinent to thermal power stations

    Energy Technology Data Exchange (ETDEWEB)

    A.G. Tumanovskii; V.R. Kotler [OAO All-Russia Thermal Engineering Institute, Moscow (Russian Federation)

    2007-06-15

    Possible ways to protect the atmosphere and water basin against harmful emissions and effluent waters discharged from thermal power stations are considered. Data on the effectiveness of different methods for removing NOx, SO{sub 2}, and ash particles, as well as heavy metals and CO{sub 2}, from these emissions and discharges are presented.

  3. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Baker, J.W.

    1982-11-01

    The case for Sizewell B in terms of the CEGB's overall duties, policies and objectives is presented. The discussion concentrates on the rationale of the CEGB's wish to proceed with Sizewell B and the implications which an eventual decision to proceed with a Pressurised Water Reactor at Sizewell could have for future power station orders. (U.K.)

  4. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Whittle, J.

    1982-11-01

    The non-destructive testing of components for the proposed Sizewell B nuclear power station is discussed. Issues considered include: non-destructive testing techniques available; inspection of ferritic steel components during fabrication; reliability of the ultrasonic inspection of ferritic structures; inspection of components of austenitic steel; in-service inspection of the reactor coolant system. (U.K.)

  5. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Pepper, R.B.

    1982-11-01

    The practice of radiological protection within the CEGB is described. Health physics at nuclear power stations is discussed. Radiation exposure of operational staff at a PWR and radiation exposure of members of the public are considered. Finally arrangements for dealing with radiological hazards arising during a site emergency are described. (U.K.)

  6. Fuel examination at SSEB Hunterston B power station

    International Nuclear Information System (INIS)

    Angell, I.; Oldfield, D.

    1988-01-01

    After a brief description of Hunterston 'B' Power Station and its fuel, the need for post irradiation examination is established. Means of providing this on site at various stages of the fuel route are described, i.e. refuelling machine, dismantling cell and storage pond. Techniques used include the human eye, video recording and endoscopy. (author)

  7. Hinkley Point 'C' power station public enquiry: proof of evidence on coal fired power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Fothergill, S.; Witt, S.

    1988-11-01

    The Coalfield Communities Campaign (CCC) has argued that if a new base-load power station is required it should be coal-fired rather than nuclear, and that it should use UK coal. Proposals for new power stations at both Hinkley Point and at Fawley have encountered very considerable local and regional opposition, and this is increasingly likely to be the case at many other sites especially in Southern England. In contrast the CCC has sought to demonstrate that its member authorities would generally welcome the development of new coal-fired capacity on appropriate sites within their areas. In particular, this proof establishes that there is a prima facie case for considering three sites - Thorpe Marsh, Hams Hall and Uskmouth - as potential locations for a new large coal-fired power station as an alternative to Hinkley Point C. The relevant local authorities have expressed their willingness to co-operate in more detailed planning or technical investigations to secure a coal-fired power station on these sites. The CCC considers this to be a major and unprecedented offer to the CEGB and its successor bodies, which could greatly speed the development of new power staion capacity and be of considerable economic and social benefit to coalfield communities.

  8. Study of wet blasting of components in nuclear power stations

    International Nuclear Information System (INIS)

    Hall, J.

    1999-12-01

    This report looks at the method of wet blasting radioactive components in nuclear power stations. The wet blaster uses pearl shaped glass beads with the dimensions of 150-250 μm mixed with water as blasting media. The improved design, providing outer operator's positions with proper radiation protection and more efficient blasting equipment has resulted in a lesser dose taken by the operators. The main reason to decontaminate components in nuclear power plants is to enable service on these components. On components like valves, pump shafts, pipes etc. oxides form and bind radiation. These components are normally situated at some distance from the reactor core and will mainly suffer from radiation from so called activation products. When a component is to be decontaminated it can be decontaminated to a radioactive level where it will be declassified. This report has found levels ranging from 150-1000 Bq/kg allowing declassification of radioactive materials. This difference is found between different countries and different organisations. The report also looks at the levels of waste generated using wet blasting. This is done by tracking the contamination to determine where it collects. It is either collected in the water treatment plant or collected in the blasting media. At Barsebaeck the waste levels, from de-contaminating nearly 800 components in one year, results in a waste volume of about 0,250 m 3 . This waste consists of low and medium level waste and will cost about 3 600 EURO to store. The conclusions of the report are that wet blasting is an indispensable way to treat contaminated components in modern nuclear power plants. The wet blasting equipment can be improved by using a robot enabling the operators to remotely treat components from the outer operator's positions. There they will benefit from better radiation protection thus further reduce their taken dose. The wet blasting equipment could also be used to better control the levels of radioactivity on

  9. Instructor station of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Wu Fanghui

    1996-01-01

    The instructor station of Full Scope Simulator for Qinshan 300 MW Nuclear Power Unit is based on SGI graphic workstation. The operation system is real time UNIX, and the development of man-machine interface, mainly depends on standard X window system, special for X TOOLKITS and MOTIF. The instructor station has been designed to increase training effectiveness and provide the most flexible environment possible to enhance its usefulness. Based on experiences in the development of the instructor station, many new features have been added including I/O panel diagrams, simulation diagrams, graphic operation of malfunction, remote function and I/O overrides etc

  10. Increased wheeze but not bronchial hyperreactivity near power stations.

    Science.gov (United States)

    Halliday, J A; Henry, R L; Hankin, R G; Hensley, M J

    1993-08-01

    In a previous study a higher than expected prevalence of asthma was found in Lake Munmorah, a coastal town near two power stations, compared with another coastal control town. This study aimed to compare atopy, bronchial hyperreactivity, and reported symptoms of asthma in the power station town and a second control area with greater socioeconomic similarity. A cross sectional survey was undertaken. Lake Munmorah, a coastal town near two power stations, and Dungog, a country town in the Hunter Valley, NSW, Australia. All children attending kindergarten to year 6 at all schools in the two towns were invited to participate in 1990. The response rates for the questionnaire for reported symptoms and associated demographic data were 92% in Lake Munmorah and 93% in Dungog, with 84% and 90% of children respectively being measured for lung function, atopy, and bronchial reactivity. There were 419 boys and 432 girls aged 5 to 12 years. Main outcome measures were current wheeze and bronchial hyper-reactivity, defined as a fall in forced expiratory volume in 1 second (FEV1) or peak expiratory flow (PEF) of 20% or more. Current wheeze was reported in 24.8% of the Lake Munmorah children compared with 14.6% of the Dungog children. Bronchial hyper-reactivity was similar for both groups--25.2% in Lake Munmorah and 22.3% in Dungog. The mean baseline FEV1 was lower in Lake Munmorah than in Dungog (p power station town, but bronchial hyper-reactivity and skin test defined atopy were similar in the two communities. These results are consistent with the previous study and confirm the increased presence of reported symptomatic illness in the town near power stations.

  11. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  12. Risk of loss power for ATWT in Daya Bay and Ling'ao nuclear power stations

    International Nuclear Information System (INIS)

    Guo Cheng

    2010-01-01

    In order to analyze the differences between the Anticipated Transient Without Reactor Trip (ATWT) and other reactor protection methods, this paper analyzes in detail the realizing means of ATWT and the effect of lost of power supply on the units based on Daya Bay and Ling'ao Nuclear Power Stations by system wiring diagram. Based on the comprehensive analysis,this paper proposes the sequence for powering when recovering the power source after ATWT power supply (LCC/LNE) loss for Daya Bay and Ling'ao Nuclear Power Stations. (authors)

  13. BR3/Vulcain Nuclear Power Station. Construction and Operational Experience

    Energy Technology Data Exchange (ETDEWEB)

    Storrer, J. [Belgonucleaire, S.A., Brussels (Belgium)

    1968-04-15

    power density of 41 MW(th)t U. The expected average fuel burnup and core life are 25 000 MWd/t U and 620 equivalent full-power days, respectively. These characteristics have been achieved without taking advantage of various improvements - such as the possibility of flattening the power distribution in the core by the use of two or more fuel enrichments - which are planned for more advanced Vulcain cores. The successful construction and operation of BR3/Vulcain will have demonstrated that components and techniques are available to build and operate simple, compact reactors in the small to medium power range, using long-life, high-power density cores and variable moderation. From the analyses carried out so far this concept competes well with other reactor concepts, while market surveys have indicated that there is a world market for small to medium power stations at prices within reach of those currently mentioned for the Vulcain design. (author)

  14. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  15. Shippingport Atomic Power Station decommissioning program and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F P; Skavdahl, R E

    1985-01-01

    The Shippingport Station decommissioning project is the first decommissioning of a large scale nuclear power plant, and also the first nuclear power plant to be decommissioned which has continued the power operation as long as 25 years. The nuclear facilities which have been decommissioned so far have operated for shorter period and were small as compared with commercial power reactors, but the experience gained by those decommissionings as well as that gained by nuclear plant maintenance and modification has helped to establish the technology and cost basis for Shippingport and future decommissioning projects. In this paper, the current status of the preparation being made by the General Electric Co., its subcontractor and the US Department of Energy for starting the decommissioning phase of the Shippingport Atomic Power Station is described. Also remote metal cutting, decontamination, concrete removal, the volume reduction of liquids and solids and robotics which will be applied to the project are discussed. The Shippingport Station is a 72 MWe PWR plant having started operation in 1957, and permanently shut down in 1982, after having generated over 7.4 billion kWh of electricity.

  16. Reduction technique of drop voltage and power losses to improve power quality using ETAP Power Station simulation model

    Science.gov (United States)

    Satrio, Reza Indra; Subiyanto

    2018-03-01

    The effect of electric loads growth emerged direct impact in power systems distribution. Drop voltage and power losses one of the important things in power systems distribution. This paper presents modelling approach used to restructrure electrical network configuration, reduce drop voltage, reduce power losses and add new distribution transformer to enhance reliability of power systems distribution. Restructrure electrical network was aimed to analyse and investigate electric loads of a distribution transformer. Measurement of real voltage and real current were finished two times for each consumer, that were morning period and night period or when peak load. Design and simulation were conduct by using ETAP Power Station Software. Based on result of simulation and real measurement precentage of drop voltage and total power losses were mismatch with SPLN (Standard PLN) 72:1987. After added a new distribution transformer and restructrured electricity network configuration, the result of simulation could reduce drop voltage from 1.3 % - 31.3 % to 8.1 % - 9.6 % and power losses from 646.7 watt to 233.29 watt. Result showed, restructrure electricity network configuration and added new distribution transformer can be applied as an effective method to reduce drop voltage and reduce power losses.

  17. Computer based training simulator for Hunterston Nuclear Power Station

    International Nuclear Information System (INIS)

    Bowden, R.S.M.; Hacking, D.

    1978-01-01

    For reasons which are stated, the Hunterston-B nuclear power station automatic control system includes a manual over-ride facility. It is therefore essential for the station engineers to be trained to recognise and control all feasible modes of plant and logic malfunction. A training simulator has been built which consists of a replica of the shutdown monitoring panel in the Central Control Room and is controlled by a mini-computer. This paper highlights the computer aspects of the simulator and relevant derived experience, under the following headings: engineering background; shutdown sequence equipment; simulator equipment; features; software; testing; maintenance. (U.K.)

  18. Transwaal - economic district heat from the Beznau nuclear power station

    International Nuclear Information System (INIS)

    Schatzmann, G.

    1986-01-01

    Initial study phases of the Transwaal project for distribution of heat from the Beznau nuclear power station via pipe lines to Aare and Limmat valley regions in Switzerland are presented. 500 MW heat availability through heat exchangers providing forward flow water temperature of 120 0 C, pipe line network and pumping station aspects, and the system energy flow diagram, are described. Considerations based on specific energy requirements in the year 2000 including alternative schemes showed economic viability. Investment and consumer costs and savings compared with oil and gas heating are discussed. Heat supply is guaranteed well into the 21st century and avoids environmental disadvantages. (H.V.H.)

  19. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  20. Crud separation from equipment drain of BWR atomic power station

    International Nuclear Information System (INIS)

    Hayashi, Masaru; Yamaguchi, Hisashi; Moriya, Yasuhiro; Koshiba, Yukihiko; Ota, Yoshiharu.

    1977-01-01

    In the primary cooling systems of BWR nuclear power stations, radioactive crud is generated and accumulates in reactors and circulating systems, which causes the radiation exposure of workers at the time of the inspection and maintenance of reactors. The chemical composition and grain size distribution of crud differ largely according to the construction of primary systems, the operational conditions of reactors, and the process of operation. The study on the application of nuclear pore membrane filter NPMF to the separation of crud in the waste water from equipment drain systems has been carried out. With the NPMF, clarified filtrate can be obtained without any filter aid, therefore the secondary waste of filter sludge is not generated. When the filter is clogged, the filtration capability can be regenerated by reverse flow washing, and continuous filtration is possible actually because the regeneration takes only short time. The NPMF is the polycarbonate membrane of about 10 μm thick, to which charged particles are irradiated vertically, and the flight tracks are etched with alkali solution, thus the required pore treatment is applied. The basic investigation of waste liquid, the endurance test of actual filters, the filtration test with the pilot apparatus, the demonstration test with an actual equipment, and the design of the actual equipment have been carried out for three years. (Kako, I.)

  1. Simulator training and licensing examination for nuclear power station operator

    International Nuclear Information System (INIS)

    Xu Pingsheng

    2007-01-01

    For the recruitment, training and position qualification of the simulator instructors and feedback of training effect, the management approaches are formulated in 'The System for Simulator Training and Licensing Examination of Daya Bay Nuclear Power Station Operators'. The concrete requirements on the professional knowledge, work experience and foreign language ability of a simulator instructor are put forward. The process of instructor training is designed. The training items include the trainer training, pedagogy training, time management training, operation activities training during outage of unit, 'shadow' training and on-the-jot training on simulator courses. Job rotation is realized between simulator instructor and licensing personnel on site. New simulator instructor must pass the qualification identification. After a duration of 2 years, re-qualification has to be carried out. On the basis of the operator training method introduced from EDF (electricite De France), some new courses are developed and the improvement on the initial training, retaining courses, the technical support and the experience feedback by using the simulator is done also. (authors)

  2. Manufacture of power station heat exchangers using modern production technology

    International Nuclear Information System (INIS)

    Genzlinger, W.; Hoffmann, J.; Ohlhaeuser, K.

    1986-01-01

    Heat exchangers of high quality and operational safety can only be fabricated economically if fabrication is as 'simple' as possible and can be controlled and if, through value analysis, the work flows can be mechanized and automated and the following requirements are met: use of materials that are easy to work with for the application considered, choice of product designs and wall thicknesses that offer favourable conditions for processing and non-destructive testing, placing of seams in such a way that good accessibility for welding and minimum residual welding stresses are assured, minimizing the number of welding seams, use of automatic welding machines for submerged-arc welding and electronically controlled sources of welding current - semi-automatic equipment for spatter-free interfaces (pulse technique), electronically controlled equipment for welding in rollers and pipes and CNC-controlled machining centres for drilling pipe galleries (deep-hole drilling) and baffle plates and for machining the sealing elements after welding. Continuous inspections in each phase of fabrication assures that heat exchangers are made which fully meet the requirements of nuclear power station operators. (orig.)

  3. Two phase flow problems in power station boilers

    International Nuclear Information System (INIS)

    Firman, E.C.

    1974-01-01

    The paper outlines some of the waterside thermal and hydrodynamic phenomena relating to design and operation of large boilers in central power stations. The associated programme of work is described with an outline of some results already obtained. By way of introduction, the principal features of conventional and nuclear drum boilers and once-through nuclear heat exchangers are described in so far as they pertain to this area of work. This is followed by discussion of the relevant physical phenomena and problems which arise. For example, the problem of steam entrainment from the drum into the tubes connecting it to the furnace wall tubes is related to its effects on circulation and possible mechanisms of tube failure. Other problems concern the transient associated with start-up or low load operation of plant. The requirement for improved mathematical representation of steady and dynamic performance is mentioned together with the corresponding need for data on heat transfer, pressure loss, hydrodynamic stability, consequences of deposits, etc. The paper concludes with reference to the work being carried out within the C.E.G.B. in relation to the above problems. The facilities employed and the specific studies being made on them are described: these range from field trials on operational boilers to small scale laboratory investigations of underlying two phase flow mechanisms and include high pressure water rigs and a freon rig for simulation studies

  4. Slovak power stations, Nuclear Power Plants Mochovce (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Mochovce in 1997 is presented. These activities are reported under the headings: (1) Director's foreword; (2) Power plant management; (3) Highlights of 1997; (4) Capital construction; (5) Nuclear safety; (6) Radiation safety; (7) Work safety and health protection at work; (9) Fire protection; (10) Units upgrading - safety measures; (11) Maintenance; (12) Operation; (13) Environmental impacts of operations; (14) List of balances; (15) Human sources; (16) International co-operation; (17) Public relations

  5. Aspects of safety and of functional construction and configuration in planning and designing nuclear heating stations

    International Nuclear Information System (INIS)

    Adam, E.; Mueller, R.; Boettger, M.; Kremtz, U.

    1982-01-01

    The present studies are based on the design of a technological project of a nuclear heating station with a unit power of 250 MW. Essentially, this nuclear heating station is a three-circuit plant, the primary coolant circuit being based on natural circulation through the reactor vessel with integrated heat exchangers. Starting from the social objective and the derived development structure of the territory, the siting problems in integrating the nuclear heating stations have to be solved. On the basis of the resulting dimensions of the containment the technical and economical specifications of different versions of containment design are evaluated. (author)

  6. Allowing for the effect of external forces in the protection of nuclear power stations. Protecting EDF's nuclear power stations from earthquakes

    International Nuclear Information System (INIS)

    Betbeder-Matibet, J.

    1985-01-01

    This paper describes the method adopted to determine the seismic level to be allowed for on a given site. One goes on to summarise the general rules applied to protect nuclear power stations against earthquakes and traces the pattern of studies carried out to determine the stresses to which plants can be subjected. Finally, one examines the consequences which allowing for earthquakes have on the design of engineering work and equipment [fr

  7. Hinkley Point 'C' power station public inquiry: outline statement of case

    International Nuclear Information System (INIS)

    1988-05-01

    This outline statement relates to the public inquiry to be held into the planning application by the Central Electricity Generating Board (CEGB) to construct a 1200 MW Pressurized Water Reactor (PWR) power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom, adjacent to an existing nuclear power station. The inquiry will consider economic, safety, environmental and planning matters relevant to the application and the implications for agriculture and local amenities of the re-aligning of two 400 kV overhead transmission lines. The outline statement contains submissions on: policy contest and approach; the requirement for Hinkley Point ''C''; design and safety; local issues. (UK)

  8. Lessons learned from our accident at Fukushima nuclear power stations

    International Nuclear Information System (INIS)

    Kawano, A.

    2012-01-01

    This paper is given in order to share the detailed information on the Fukushima Accident which occurred on March 11, 2011, and the lessons learned from it which worldwide nuclear experts might currently have more interest in. The paper first reflects how the facilities were damaged by a very strong earthquake and a series of beyond design-basis tsunamis. The earthquake caused loss of all off-site electric power at Fukushima Daiichi Nuclear Power Station (1F), and the following series of tsunami made all emergency diesel generators except one for Unit 6 and most of DC batteries inoperable and severely damaged most of the facilities located on the ocean side. Thus all the units at 1F resulted in the loss of cooling function and ultimate heat sink for a long time period. TEPCO focused on restoration of the instruments and lights in the Main Control Room (MCR), preparation of alternative water injection and venting of Primary Containment Vessel (PCV) in the recovery process. However, the workers faced a lot of difficulties such as total darkness, repeated aftershocks, high radiation dose, a lot of debris on the ground, loss of communication means, etc. Massive damages by the tsunami and lack of necessary equipments and resources hampered a quick recovery. It eventually resulted in the severe core damage of Unit 1, 2, and 3 and also the hydrogen explosions in the reactor buildings of Unit 1, 3, and 4. This paper finally extracts the lessons learned from the accident and proposes the countermeasures, such as flood protection for essential facilities, preparation of practical and effective tools, securing communication means and so on. These would help the people involved in the nuclear industries all over the world properly understand the accident and develop their own countermeasures appropriately. (authors)

  9. Technical specifications, Beaver Valley Power Station, Unit 2 (Docket No. 50-412): Appendix ''A'' to License No. NPF-73

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents information concerning the Beaver Valley Power Station Unit 2 Reactor. Topics under discussion include: safety limits and limiting safety system settings; limiting condition for operation and surveillance requirements; design features; and administrative controls

  10. The influence of subway station design on noise levels.

    Science.gov (United States)

    Shah, Ravi R; Suen, Jonathan J; Cellum, Ilana P; Spitzer, Jaclyn B; Lalwani, Anil K

    2017-05-01

    To investigate the impact of subway station design on platform noise levels. Observational. Continuous A-weighted decibel (dBA) sound levels were recorded in 20 New York City subway stations, where trains entered on either a straight track or curved track in 10 stations each. Equivalent continuous noise levels (L eq ) at various locations on the boarding platform (inbound end, midplatform, and outbound end) during train entry and exit were compared between the straight and curved stations in broadband as well as narrow one-third octave bands. Overall, curved stations trended louder than straight stations, although the difference in broadband L eq did not reach statistical significance (curve, 83.4 dBA; straight, 82.6 dBA; P = .054). Noise levels were significantly louder at the inbound end of the platform during train entry (inbound, 89.7 dBA; mid, 85.5 dBA; outbound, 78.7 dBA; P < .001) and at the outbound end during train exit (inbound, 79.7 dBA; mid, 85.3 dBA; outbound, 89.1 dBA; P < .001). Narrow band analysis showed that curved stations were significantly louder than straight stations at 100 Hz and high frequencies from 8 to 20 kHz. Peak impact levels ranged from 104 to 121 dBA. Curved stations have a different noise profile compared to straight stations and are significantly louder than straight stations at high frequencies. Designing stations with straight tracks within the platform can help reduce commuter noise exposure. NA Laryngoscope, 127:1169-1174, 2017. © 2016 The American Laryngological, Rhinological and Otological Society, Inc.

  11. Designing for cooperation at a Radio Station

    DEFF Research Database (Denmark)

    Kensing, F.; Simonsen, Jesper; Bødker, Keld

    1997-01-01

    We address computer support for work and its coordination in one of the radio channels of the Danish Broadcasting Corporation. Based upon ethnographically inspired analysis and participatory design techniques, we propose design solutions now implemented or under implementation. We focus on cooper......We address computer support for work and its coordination in one of the radio channels of the Danish Broadcasting Corporation. Based upon ethnographically inspired analysis and participatory design techniques, we propose design solutions now implemented or under implementation. We focus...

  12. Space Station Human Factors: Designing a Human-Robot Interface

    Science.gov (United States)

    Rochlis, Jennifer L.; Clarke, John Paul; Goza, S. Michael

    2001-01-01

    The experiments described in this paper are part of a larger joint MIT/NASA research effort and focus on the development of a methodology for designing and evaluating integrated interfaces for highly dexterous and multifunctional telerobot. Specifically, a telerobotic workstation is being designed for an Extravehicular Activity (EVA) anthropomorphic space station telerobot called Robonaut. Previous researchers have designed telerobotic workstations based upon performance of discrete subsets of tasks (for example, peg-in-hole, tracking, etc.) without regard for transitions that operators go through between tasks performed sequentially in the context of larger integrated tasks. The experiments presented here took an integrated approach to describing teleoperator performance and assessed how subjects operating a full-immersion telerobot perform during fine position and gross position tasks. In addition, a Robonaut simulation was also developed as part of this research effort, and experimentally tested against Robonaut itself to determine its utility. Results show that subject performance of teleoperated tasks using both Robonaut and the simulation are virtually identical, with no significant difference between the two. These results indicate that the simulation can be utilized as both a Robonaut training tool, and as a powerful design platform for telepresence displays and aids.

  13. Environmental protection in coal utilization and its problems at Sultan Salahuddin Abdul Aziz Power Station, Kapar

    Energy Technology Data Exchange (ETDEWEB)

    Bock, L.C. (Tenaga Nasional Berhad (Malaysia). Research and Development Dept.)

    1990-11-01

    Efforts to prevent and minimise pollution as well as to enhance the quality of the environment around the new coal-fired Sultan Salanuddin Power Station are described. Malaysian environmental regulations are mentioned and pollution-reducing elements designed into the power plant are listed. A Public Participation Forum was held to inform the public of the planned power station and the environmental considerations. An Environmental Audit was conducted which compared the measured impacts of the operational station with the predicted expectations. On-going air quality and wastewater discharge monitoring procedures are outlined. Measures to control coal dust and spontaneous combustion of coal, and methods used to dispose of coal ash are described. 3 figs.

  14. Steam turbines for nuclear power stations in Czechoslovakia and their use for district heating

    International Nuclear Information System (INIS)

    Drahy, J.

    1989-01-01

    The first generation of nuclear power stations in Czechoslavakia is equipped with 440 MW e pressurized water reactors. Each reactor supplies two 220 MW, 3000 rpm condensing type turbosets operating with saturated steam. After the completion of heating water piping systems, all of the 24 units of 220 MW in Czechoslovak nuclear power stations will be operated as dual purpose units, delivering both electricity and heat. At the present time, second-generation nuclear power stations, with 1000 MW e PWRs, are being built. Each such plant is equipped with one 1000 MW full-speed saturated steam turbine. The turbine is so designed as to permit the extraction of steam corresponding to the following quantities of heat: 893 MJ/s with three-stage water heating (150/60 0 C); and 570 MJ/s with two-stage water heating (120/60 0 C). The steam is taken from uncontrolled steam extraction points. (author)

  15. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  16. (Shippingport Atomic Power Station). Quarterly operating report, third quarter 1980

    Energy Technology Data Exchange (ETDEWEB)

    Zagorski, J. F.

    1980-01-01

    At the beginning of the third quarter of 1980, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops in service. During the quarter, the Station was operated for Duquesne Light Company System grid including base load and swing load operation. Twelve (12) planned swing load operations were performed on the LWBR Core this quarter to complete the LWBR operating plan of fifty (50) during this operating phase. The Station was shutdown on September 12 for the Fall 1980 Shutdown and remained in this mode through the end of the quarter. The LWBR Core has generated 18,297.98 EFPH from start-up through the end of the quarter. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. The radioactive liquid waste effluent line to the river remained blanked off to prevent inadvertent radioactive liquid waste discharges. During the quarter, approximately 0.001 curies of Xe 133 activity were released from the station. The radioactivity released from Shippingport Station is far too small to have any measurable effect on the general background environmental radioactivity outside the plant.

  17. Stade nuclear power station (KKS): four giants on tour

    International Nuclear Information System (INIS)

    Beverungen, M.; Viermann, J.

    2008-01-01

    The Stade nuclear power station was the first nuclear power plant in the Federal Republic of Germany to deliver heat in addition to electricity. Since 1984, district heat was distributed to a saltworks nearby. The power plant, which is situated on the banks of the river Elbe, was commissioned in 1972 after approximately 4 years of construction. Together with the Wuergassen plant, it was among the first commercial nuclear power plants in this country. E.ON Kernkraft holds a 2/3 interest, Vattenfall Europe a 1/3 interest in the nuclear power plant. The Stade nuclear power station was decommissioned on November 14, 2003 for economic reasons which, in part, were also politically motivated. In September 2005, the permit for demolition of the nuclear part was granted. The release from supervision under the Atomic Energy Act is expected for 2014. In the course of demolition, the 4 steam generators of the Stade nuclear power station were removed. These components, which have an aggregate weight of approx. 660 tons, are to be safely re-used in Sweden. In September 2007, the steam generators were loaded on board the Swedish special vessel, MS Sigyn, by means of a floating crane. After shipment to Sweden, heavy-duty trucks carried the components to the processing hall of Studsvik AB for further treatment. After 6 months of treatment, the contaminated inner surfaces of the tube bundles of the steam generators have been decontaminated successfully, among other items. This has increased the volume of material available for recycling and thus decreased the volume of residues. (orig.)

  18. Radioactive waste treatment system for Tsuruga Nuclear Power Station

    International Nuclear Information System (INIS)

    Taniguchi, Takashi; Takeshima, Masaki; Saito, Toru; Kikkawa, Ryozo

    1978-01-01

    The augmentation of the radioactive waste treatment system in the Tsuruga Nuclear Power Station was planned in 1973, and this enlarged facility was completed in June, 1977. The object of this augmentation is to increase the storage capacity for wastes and to enlarge the treating capacity utilizing the newly installed facility. The operating experience in the facility having been already constructed was fed back for the engineering of this new facility. This new facility contains the newly developed vacuum forced circulation type concentrator, the exclusive storage pool for solid wastes, etc. At the design stage of this new system, the pilot plant test of slurry transportation and the corrosion test of long hours were carried out as the research and developmental works for the confirmation of correct design condition. The measures for augmenting this radioactive waste treatment system are the installation of a long time storage tank with the capacity of 350 m 3 , the sit bunker facility and the drum storage as the storage facility, and the vacuum forced circulation type concentrator with the circulating flow rate more than 200 times as much as the treating flow rate and vacuum level of 0.255 ata. The augmented system is shown with the flow sheet of whole waste disposal system. The flow sheet of the concentrator is separately shown, and the relating research and developmental works, for example, the test of the cause of corrosion, the surface finishing test, the material test, the blockage test for heat transfer tubes and the inhibiter test, are explained with the test results. The ion exchange resin is transported by air and water as the slurry state, and the long distance transport of about 250 m is required in this new system. As clogging has to be avoided in this transportation, the experimental work was conducted to obtain the flow characteristics of slurry, and the test result is outlined. (Nakai, Y.)

  19. (Shippingport Atomic Power Station). Quarterly operating report, fourth quarter 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    At the beginning of the fourth quarter of 1980, the Shippingport Atomic Power Station remained shutdown for the normally planned semiannual maintenance and testing program, initiated September 12, 1980. Operational testing began on November 7. Maximum power was achieved November 28 and was maintained throughout the remainder of the quarter except as noted. The LWBR Core has generated 19,046.07 EFPH from start-up through the end of the quarter. During this quarter, approximately 0.000025 curies of Xe 133 activity were released from the station. During the fourth quarter of 1980, 1081 cubic feet of radioactive solid waste was shipped out of state for burial. These shipments contained 0.037 curies of radioactivity.

  20. Organization of radiation protection in German nuclear power stations

    International Nuclear Information System (INIS)

    1989-01-01

    Using the operating handbooks of the nuclear power stations in West Germany, an examination was carried out of how far the existing organisational structure for radiation protection fulfils the requirements for protection and whether a standardisation of the organisation would provide improvements for the protection of the personnel and for the practicability of the radiation protection organisation. In particular, the parts 'Personnel operating organisation', 'Radiation protection order' and 'Maintenance order' of the operating handbook were evaluated and an audit was made of the radiation protection organisation. In general, the result of the assessment is that the organisation of radiation protection does not contradict the orders, guidelines and regulations in any of the nuclear power stations examined. Corresponding to the possibilities of regulating details of the radiation protection organisation within the undertaking, the target of 'protection of the personnel against radioactive irradiation' is achieved by the various organisation structures which are largely equal to the given example. (orig./HP) [de

  1. High system-safety level of nuclear power stations

    International Nuclear Information System (INIS)

    Lutz, H.R.

    1976-01-01

    A bluntly worded disquisition contrasting the incidence of death and harm to persons in the chemical industry with the low hazards in nuclear power stations. Quotes conclusions from a U.S. accident study that the risk from 100 large power stations is 100 times smaller than from chlorine manufacture and transport. The enclosure of a reactor in a safety container, the well understood effects of radioactivity on man, and the ease of measuring leakage well below safe limits, are safety features which he considers were not matched in the products and plant of the Seveso factory which suffered disaster. Questions the usefulness of warnings about nuclear dangers when chemical dangers are much greater and road dangers very much greater still. (R.W.S.)

  2. Environmental qualification test of electrical penetration for nuclear power stations

    International Nuclear Information System (INIS)

    Kooziro, Tetsuya; Nakagawa, Akitoshi; Toyoda, Shigeru; Uno, Shunpei

    1979-01-01

    Environmental qualification test was conducted according to IEEE Std. 323-1974 in order to evaluate the safety and reliability of electrical penetration of PWR type nuclear power station. Electrical penetration is the assemblies of electric cables attached to the containment vessel and penetrate through the vessel. Since it is a part of the vessel, it is deemed to be one of the primary safety equipments that are important for the safety and reliability of nuclear power stations. Environmental tests were conducted continuously as to heat cycle, vibration and LOCA with the full size specimens of bushing type, pigtail type and triaxial cable type and at the same time thermal life and irradiation tests were conducted on the insulation materials used, in order to obtain the comprehensive evaluation of their electrical and mechanical characteristics. As the result, they all satisfied the requirements for the circuits for actual use during and after various environmental qualification tests according to IEEE Std. 323. (author)

  3. Evaluation of Shoreham Nuclear Power Station, Unit 1 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Shoreham Nuclear Power Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Shoreham T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Shoreham Nuclear Power Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  4. Quality assurance at a German power station company

    International Nuclear Information System (INIS)

    Czychon, K.H.

    1992-01-01

    The Integrated Operational Management System of the Emsland nuclear power station is described, together with its aims and system architecture as well as the structure and modus operandi of the Integrated Operational Management System Manager. The completion of repair work and the processing of modification and maintenance reports are explained as examples. Experience gained in the introduction and use of the system is presented. figs., 6 refs

  5. The risks at nuclear power stations and their insurance

    International Nuclear Information System (INIS)

    Schludi, H.N.

    1994-01-01

    Insurance can offer an uninterrupted insurance cover from start-up-to shut-down of a nuclear power station. This is assured by the insurance for the erection, for the nuclear liability, for the nuclear/fire, for the engines, for operational interruptions and for the transport. For each of the above mentioned insurance branches, essential characteristic features, such as risk carrier, protection range and insurance costs, are given. (orig.) [de

  6. Dungeness Power Station off-site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This off-site Emergency Plan in the event of an accidental release of radioactivity at the Dungeness Nuclear power station sets out the necessary management and coordination processes between Nuclear Electric, operators of the site, the emergency services and relevant local authorities. The objectives promoting the aim are identified and the activities which will be undertaken to protect the public and the environment in the event of an emergency are outlined. (UK)

  7. Legionella control in power station cooling towers using oxidising biocides

    Energy Technology Data Exchange (ETDEWEB)

    Sailer, Christian; Rawlinson, Julia; Killeen, Paul [Ecolab PTY LTD, Ascot, WA (Australia)

    2009-02-15

    Power stations have used oxidising biocides such as chlorine or bromine for many years to control microbial growth in their cooling towers. In this paper Ecolab trademark looks at the direct effect halogen concentration has on Legionella populations in order to determine the most effective halogenation rate required to ensure that the site key performance indicator (KPI) of < 100 colony-forming units (cfu) per mL can be maintained. (orig.)

  8. Quality assurance grading of conventional equipment at nuclear power station

    International Nuclear Information System (INIS)

    Li Ping; Li Shichang

    2006-01-01

    Equipment QA grading with the systematic and standardized approach will benefit the concerned organizations by effective allocating of limited resources to guarantee the quality of essential equipment. This paper presents a new quality assurance grading system for the convention systems/equipment of nuclear power station, which is operative and at the same time could help the owner to allot resource reasonably through the analysis of the purpose of grading and the experience and lessons of LINGAO Phase I project. (authors)

  9. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Hawes, F.B.

    1982-11-01

    The biological consequences of using a direct cooled system at the proposed Sizewell B power station are dealt with. Problems caused by the impingement of organisms on the fine-mesh screens through which the water is pumped, by the entrainment of smaller organisms in the flow through the cooling system and by the discharge of warmed chlorinated water into the sea are discussed. The chlorination of cooling water is described. (U.K.)

  10. Notes on organization of nuclear power station construction

    International Nuclear Information System (INIS)

    Marsicanin, B.

    1977-01-01

    After a visite to some european nuclear power stations under construction and in operation, in this report a short general view on this subject is given. The progress in this in large, industrialised countries is considered as well as the relevant experience in developing countries. The new role of nuclear research institutes during construction and operation is pointed out and prospects of this cooperation evaluated. (author)

  11. Process for treating waste water containing hydrazine from power stations

    International Nuclear Information System (INIS)

    Hoffmann, W.

    1982-01-01

    A process for treating waste water containing hydrazine from nuclear power stations is proposed, characterized by the fact that the water is taken continuously through a water decomposition cell. If the water does not have sufficient conductivity itself, a substance raising the electrical conductivity is added to the water to be treated. The electrolysis is situated in the waste water tank. (orig./RB) [de

  12. An adaptive predictive controller and its applications in power stations

    Energy Technology Data Exchange (ETDEWEB)

    Yang Zhiyuan; Lu Huiming; Zhang Xinggao [North China Electric Power University, Beijing (China); Song Chunping [Tsinghua University, Beijing (China). Dept. of Thermal Energy Engineering

    1999-07-01

    Based on the objective function in the form of integration of generalized model error, a globally convergent model reference adaptive predictive control algorithm (MRAPC) containing inertia-time compensators is presented in this paper. MRAPC has been successfully applied to control important thermal process of more than 20 units in many Chinese power stations. In this paper three representative examples are described. Continual operation results for years demonstrate that MRAPC is a successful attempt for the practical applications of adaptive control techniques. (author)

  13. 47 CFR 74.710 - Digital low power TV and TV translator station protection.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.710 Digital low power TV and TV translator station protection. (a) An application to construct a new low power TV, TV translator, or TV...

  14. 47 CFR 74.792 - Digital low power TV and TV translator station protected contour.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.792 Digital low power TV and TV translator station protected contour. (a) A digital low power TV or TV translator will be protected from...

  15. 47 CFR 74.707 - Low power TV and TV translator station protection.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.707 Low power TV and TV translator station protection. (a)(1) A low power TV or TV translator will be protected from interference from other...

  16. Axial power deviation control strategy and computer simulation for Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Liao Yehong; Zhou Xiaoling, Xiao Min

    2004-01-01

    Daya Bay Nuclear Power Station has very tight operation diagram especially at its right side. Therefore the successful control of axial power deviation for PWR is crucial to nuclear safety. After analyzing various core characters' effect on axial power distribution, several axial power deviation control strategies has been proposed to comply with different power varying operation scenario. Application and computer simulation of the strategies has shown that our prediction of axial power deviation evolution are comparable to the measurement values, and that our control strategies are effective. Engineering experience shows that the application of our methodology can predict accurately the transient of axial power deviation, and therefore has become a useful tool for reactor operation and safety control. This paper presents the axial power control characteristics, reactor operation strategy research, computer simulation, and comparison to measurement results in Daya Bay Nuclear Power Station. (author)

  17. Concrete works in Igata Nuclear Power Station Unit-2

    International Nuclear Information System (INIS)

    Yanase, Hidemasa

    1981-01-01

    The construction of Igata Nuclear Power Station Unit-2 was started in February, 1978, and is scheduled to start the commercial operation in March, 1982. Construction works are to be finished by August, 1981. The buildings of Igata Nuclear Power Station are composed of large cross section concrete for the purpose of shielding and the resistance to earth quakes. In response to this, moderate heat Portland cement has been employed, and in particular, the heat of hydration has been controlled. In this report, also fine and coarse aggregates, admixtures and chemical admixtures, and further, the techniques to improve the quality are described. Concrete preparation plant was installed in the power station site. Fresh concrete was carried with agitator body trucks from the preparation plant to the unloading point, and from there with pump trucks. Placing of concrete was carried out, striving to obtain homogeneous and dense concrete by using rod type vibrators. Further, concrete was placed in low slump (8 - 15 cm) to reduce water per unit volume, and its temperature was also carefully controlled, e.g., cold water (temperature of mixing water was about 10 deg C) was used in summer season (end of June to end of September). As a result, the control target was almost satisfied. As for testing and inspection, visual appearance test was done as well as material testing in compliance with JIS and other standards. (Wakatsuki, Y.)

  18. Natural radionuclides near a coal-fired power station

    International Nuclear Information System (INIS)

    Smith-Briggs, J.L.

    1984-01-01

    A previous assessment of the radiological consequences of the emission of natural radionuclides from coal-fired power stations had indicated that 210 Pb was the main contributor to the maximum individual dose. This dose arose from the consumption of foodstuffs particularly cattle liver contaminated by deposited fly ash. Uncertainty surrounded some of the factors used in the assessment, and a limited environmental monitoring programme was recommended to improve it. An experiment has been performed to measure the specific activities of 210 Pb and 210 Po in livers from cattle that had grazed in a field near Didcot power station. Livers from cattle in the Cotswold region have been measured for comparison. The specific activities of 210 Pb and 210 Po in soil and grass samples from both areas have also been measured at three-monthly intervals over a year. No statistically significant increases were observed in the 210 Pb and 210 Po levels in liver, soil or grass samples which could be attributed to the operation of the power station. Transfer coefficients for 210 Pb from forage to liver were about two orders of magnitude less than that used in the original assessment, and the transfer coefficients for 210 Po about a factor a two less. (orig.)

  19. A list of abnormal occurences at Swedish nuclear power stations

    International Nuclear Information System (INIS)

    McHugh, B.

    1974-08-01

    This report consists of a list of extracts from documents belonging to Statens Kaernkraftinspektion (SKI) in Sweden. It deals with non-routine occurrences at the Swedish nuclear power stations which are in operation or where test operations of components and systems have started. The investigation has included matter about the following nuclear power plants: Barsebaeck-1, Oskarshamn-1, Oskarshamn-2, Ringhals-1, Ringhals-2, Aagesta. In all cases from the start of the test operations up to latest the 1st of June 1974. (M.S.)

  20. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Wright, J.K.

    1982-11-01

    A description is given of the CEGB's current assessment of the potential contribution to electricity generation of those methods considered to be the most significant alternatives to conventional power stations or thermal nuclear reactors for generating electricity. The state of development of the technology, the timescale on which it could be developed, its ability to generate electricity reliably and the cost of generating electricity are some of the matters considered. The following topics are covered: potential developments in coal fired generating plant; combined heat and power generation; energy storage; electricity generation from renewable energy sources; fast reactors and fusion. (U.K.)

  1. Fundamentals of asset management in an ageing nuclear power station

    International Nuclear Information System (INIS)

    Crook, B.

    2014-01-01

    In an ageing nuclear power station there are many challenges associated with implementing and refining an asset management program. Ageing nuclear power stations are faced with the formidable task of replacing and refurbishing major Structures, Systems, and Components (SSCs) in a managed and cost-effective way. This paper provides a brief background on equipment reliability and asset management, covers Bruce Power's methodology for implementing this complex and all-encompassing program, and describes one of the key challenges faced by Bruce Power and the industry. The effective scoping and identification of critical components is an on-going challenge which can affect the integrity of many processes built upon it. This is a fundamental building block to nearly all processes at Bruce Power and one that is at the centre of many improvement initiatives and projects. The consequences from lacking this baseline data, or worse relying upon incorrect data, can permeate the asset management process and hinder the organization's ability to assess risk properly and take the necessary steps to mitigate this risk in the short and long term. (author)

  2. Development of a Cost-Effective Solar/Diesel Independent Power Plant for a Remote Station

    Directory of Open Access Journals (Sweden)

    Okeolu Samuel Omogoye

    2015-01-01

    Full Text Available The paper discusses the design, simulation, and optimization of a solar/diesel hybrid power supply system for a remote station. The design involves determination of the station total energy demand as well as obtaining the station solar radiation data. This information was used to size the components of the hybrid power supply system (HPSS and to determine its configuration. Specifically, an appropriate software package, HOMER, was used to determine the number of solar panels, deep-cycle batteries, and rating of the inverter that comprise the solar section of the HPSS. A suitable diesel generator was also selected for the HPSS after careful technical and cost analysis of those available in the market. The designed system was simulated using the HOMER software package and the simulation results were used to carry out the optimization of the system. The final design adequately meets the station energy requirement. Based on a life expectancy of twenty-five years, a cost-benefit analysis of the HPSS was carried out. This analysis shows that the HPSS has a lower cost as compared to a conventional diesel generator power supply, thus recommending the HPSS as a more cost-effective solution for this application.

  3. Study of wet blasting of components in nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Hall, J

    1999-12-01

    This report looks at the method of wet blasting radioactive components in nuclear power stations. The wet blaster uses pearl shaped glass beads with the dimensions of 150-250 {mu}m mixed with water as blasting media. The improved design, providing outer operator's positions with proper radiation protection and more efficient blasting equipment has resulted in a lesser dose taken by the operators. The main reason to decontaminate components in nuclear power plants is to enable service on these components. On components like valves, pump shafts, pipes etc. oxides form and bind radiation. These components are normally situated at some distance from the reactor core and will mainly suffer from radiation from so called activation products. When a component is to be decontaminated it can be decontaminated to a radioactive level where it will be declassified. This report has found levels ranging from 150-1000 Bq/kg allowing declassification of radioactive materials.This difference is found between different countries and different organisations. The report also looks at the levels of waste generated using wet blasting. This is done by tracking the contamination to determine where it collects. It is either collected in the water treatment plant or collected in the blasting media. At Barsebaeck the waste levels, from de-contaminating nearly 800 components in one year, results in a waste volume of about 0,250 m{sup 3}. This waste consists of low and medium level waste and will cost about 3 600 EURO to store. The conclusions of the report are that wet blasting is an indispensable way to treat contaminated components in modern nuclear power plants. The wet blasting equipment can be improved by using a robot enabling the operators to remotely treat components from the outer operator's positions. There they will benefit from better radiation protection thus further reduce their taken dose. The wet blasting equipment could also be used to better control the levels of

  4. Participatory Design at a Radio Station

    DEFF Research Database (Denmark)

    Kensing, Finn; Simonsen, Jesper; Bødker, Keld

    1998-01-01

    realistic, design practice, that provides a sound basis for organisational decision making and for technical and organizational development and implementation. We focus on cooperative aspects within and among the editorial units, and between editorial units and the editorial board. We discuss technical...... and organisational aspects of the design, seen in light of recent CSCW concepts, including coordination and computational coordination mechanisms, technologies of accountability, and workflow from within and without....

  5. Ground control station software design for micro aerial vehicles

    Science.gov (United States)

    Walendziuk, Wojciech; Oldziej, Daniel; Binczyk, Dawid Przemyslaw; Slowik, Maciej

    2017-08-01

    This article describes the process of designing the equipment part and the software of a ground control station used for configuring and operating micro unmanned aerial vehicles (UAV). All the works were conducted on a quadrocopter model being a commonly accessible commercial construction. This article contains a characteristics of the research object, the basics of operating the micro aerial vehicles (MAV) and presents components of the ground control station model. It also describes the communication standards for the purpose of building a model of the station. Further part of the work concerns the software of the product - the GIMSO application (Generally Interactive Station for Mobile Objects), which enables the user to manage the actions and communication and control processes from the UAV. The process of creating the software and the field tests of a station model are also presented in the article.

  6. Application of design review in the heavy power plant industry

    International Nuclear Information System (INIS)

    Yound, N.

    1977-01-01

    The application of design review technique in a company engaged in the design and manufacture of turbo-generators for power stations, is described. One benefit arising from design review is its use as a means of design verification. (U.K.)

  7. Seismic design for Monju FBR power plant

    International Nuclear Information System (INIS)

    1982-01-01

    This technical report introduces the basic concept on the aseismatic design of the FBR ''Monju'' power station, of which the construction in Tsuruga is planned by the Power Reactor and Nuclear Fuel Development Corp. The safety design of Monju has been performed according to ''The concept of evaluating the safety of fast breeder reactors'', and the thought concerning the aseismatic design also is written in it. According to it, ''The guide for the examination of aseismatic design regarding power reactor facilities'' should be referred to, and the classification according to the importance in aseismatic design must be made, taking the features in the design of liquid metal-cooled FBRs fully in consideration. In the aseismatic design of Monju performed according to these basic concept, the following two points were examined. In the aseismatic design of the equipment and piping, the difference of construction from LWRs such as low pressure, thin walled and high temperature construction is taken in consideration. The classification according to the aseismatic importance of the system and equipment is made on the basis of the features in the design of Monju. The classification according to aseismatic importance, the method of calculating earthquake power, the combination of loads and the allowable limit, and the aseismatic construction of the main facilities are reported. (Kako, I.)

  8. Application of ORC power station to increase electric power of gas compression ignition engine

    Directory of Open Access Journals (Sweden)

    Mocarski Szymon

    2017-01-01

    Full Text Available The paper presents the calculation results of efficiency of the subcritical low temperature ORC power station powered by waste heat resulting from the process of cooling a stationary compression ignition engine. The source of heat to supply the ORC power station is the heat in a form of water jet cooling the engine at a temperature of 92°C, and the exhaust gas stream at a temperature of 420°C. The study considers three variants of systems with the ORC power stations with different ways of using heat source. The first variant assumes using just engine cooling water to power the ORC station. In the second variant the ORC system is powered solely by a heat flux from the combustion gases by means of an intermediary medium - thermal oil, while the third variant provides the simultaneous management of both heat fluxes to heat the water stream as a source of power supply to the ORC station. The calculations were made for the eight working media belonging both to groups of so-called dry media (R218, R1234yf, R227ea and wet media (R32, R161, R152a, R134a, R22.

  9. Actions at Kashiwazaki Kariwa Nuclear Power Station after the Niigataken Chuetsu-oki earthquake

    International Nuclear Information System (INIS)

    Orita, Shuichi

    2009-01-01

    'The Niigataken Chuetsu-oki Earthquake in 2007' occurred on July 16, 2007, and seismic motions beyond those of the design basis earthquake were recorded at Kashiwazaki Kariwa nuclear power station located near the epicenter. After the earthquake, inspections and seismic response analyses have been being performed to grasp seismic induced impacts on structures, systems and components (SSCs). In addition, re-definition of design basis earthquake, upgrading, management against disasters have been also being conducted. (author)

  10. Simulations of the design basis accident at conditions of power increase and the o transient of MSIV at overpressure conditions of the Laguna Verde Power Station; Simulaciones del accidente base de diseno a condiciones de aumento de potencia y del transitorio de cierre de MSIV a condiciones de sobrepresion de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Araiza M, E.; Nunez C, A. [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    2001-07-01

    This document presents the analysis of the simulation of the loss of coolant accident at uprate power conditions, that is 2027 MWt (105% of the current rated power of 1931MWt). This power was reached allowing an increase in the turbine steam flow rate without changing the steam dome pressure value at its rated conditions (1020 psiaJ. There are also presented the results of the simulation of the main steam isolation va/ve transient at overpressure conditions 1065 psia and 1067 MWt), for Laguna Verde Nuclear Power Station. Both simulations were performed with the best estimate computer code TRA C BF1. The results obtained in the loss of coolant accident show that the emergency core coolant systems can recover the water level in the core before fuel temperature increases excessively, and that the peak pressure reached in the drywell is always below its design pressure. Therefore it is concluded that the integrity of the containment is not challenged during a loss of coolant accident at uprate power conditions.The analysis of the main steam isolation valve transients at overpressure conditions, and the analysis of the particular cases of the failure of one to six safety relief valves to open, show that the vessel peak pressures are below the design pressure and have no significant effect on vessel integrity. (Author)

  11. Comparison of the economy of atomic power stations and fossil-fuel power stations under Danish conditions

    International Nuclear Information System (INIS)

    Daub, J.

    1977-06-01

    The report deals with the investment and financing aspects of extending the Danish electricity production system with central, base-load power stations. Technical and economic data for the plants are determined on the basis of an analysis of the information presently available. A description is given of the general problems connected with analysis of investment and finance relevant to power station expansion. Comparative calculations are given for alternative methods of expansion comprising a few stations to be put into operation in 1987 and for other alternative expansions that cover the period until 2000 as regards costs. For use in economic comparisons with a few plants, a new calculation method was developed that takes into account possible differences in the value of the plants in the electricity production system. This method is described in appendix 1. In a further two appendices are given the technical reasons for using, respectively, the present-value method in the investment analyses and the reserve power philosophy applied in the main report. (author)

  12. Papers of 6. Scientific-Technical Seminar Material Study for Electric Power Stations and Energetics

    International Nuclear Information System (INIS)

    1999-01-01

    The report is an assembly of the papers concerning the material problems occurring during the exploitation of power station. The normalization problems in power station and gas pipelines according to the prescription of UE are also discussed. (author)

  13. Low power interconnect design

    CERN Document Server

    Saini, Sandeep

    2015-01-01

    This book provides practical solutions for delay and power reduction for on-chip interconnects and buses.  It provides an in depth description of the problem of signal delay and extra power consumption, possible solutions for delay and glitch removal, while considering the power reduction of the total system.  Coverage focuses on use of the Schmitt Trigger as an alternative approach to buffer insertion for delay and power reduction in VLSI interconnects. In the last section of the book, various bus coding techniques are discussed to minimize delay and power in address and data buses.   ·         Provides practical solutions for delay and power reduction for on-chip interconnects and buses; ·         Focuses on Deep Sub micron technology devices and interconnects; ·         Offers in depth analysis of delay, including details regarding crosstalk and parasitics;  ·         Describes use of the Schmitt Trigger as a versatile alternative approach to buffer insertion for del...

  14. Water electrolysis plants for hydrogen and oxygen production. Shipped to Tsuruga Power Station Unit No.1, and Tokai No.2 power station, the Japan Atomic Power Co

    International Nuclear Information System (INIS)

    Ueno, Syuichi; Sato, Takao; Ishikawa, Nobuhide

    1997-01-01

    Ebara's water electrolysis plants have been shipped to Tsuruga Power Station Unit No.1, (H 2 generation rate: 11 Nm 3 /h), and Tokai No.2 Power Station (H 2 generation rate: 36 Nm 3 /h), Japan Atomic Power Co. An outcome of a business agreement between Nissho Iwai Corporation and Norsk Hydro Electrolysers (Norway), this was the first time that such water electrolysis plants were equipped in Japanese boiling water reactor power stations. Each plant included an electrolyser (for generating hydrogen and oxygen), an electric power supply, a gas compression system, a dehumidifier system, an instrumentation and control system, and an auxiliary system. The plant has been operating almost continuously, with excellent feedback, since March 1997. (author)

  15. The economic feasibility of renewable powered fast charging stations

    Energy Technology Data Exchange (ETDEWEB)

    Benger, Ralf; Heyne, Raoul; Wenzl, Heinz; Beck, Hans-Peter

    2011-07-01

    Electric vehicles will make an important contribution for a sustainable energy supply in the public transport sector. Although it is not sure at the moment which role the different vehicle concepts and charging options will play, it is possible to act on following assumptions: There will be purely electrically operated vehicles (EV), which will need a charging infrastructure in the public domain. Even if the number of these vehicles in comparison with hybrid electric vehicles (HEV) or range extended electric vehicles (REV) will be low, in the long run an amount of some million vehicles can be reached (1 0 % of the vehicles in Germany corresponds to round about 4 million vehicles). Charging stations in parking areas, shopping malls, at home or at work do not require high charging power because the time available for charging is relative long. In contrast charging stations beside these in normal parking areas should have the ability to charge the car batteries in a very short time, e.g. 80% of the energy content in 15 minutes or less. Therefore every charging process requires 100-200 kW electric power. Such charging stations are necessary both in rural and in urban regions.

  16. Solid radwaste characterization at surry and North Anna Power Stations

    International Nuclear Information System (INIS)

    Lippard, D.W.

    1987-01-01

    This paper describes a characterization of the solid radwaste generated at Virginia Power's North Anna and Surry power stations. The primary focus of this characterization was dry active waste (DAW). The characterization, covering the 21-month period from January 1985 through September 1986, was based on information in the station's health physics procurement records, radwaste shipping records, and from interviews with station personnel. The procurement records were the principal source of information for DAW. They were reviewed to determine the quantities of various materials, purchased during the study period, that were expected to become DAW. This provides an upper limit on the quantity in the waste for several major DAW components and a basis for the total amount of other components in the waste. The approach to characterizing DAW discussed in this paper could be implemented and regularly updated by utilizing a computerized procurement records system. If a use code (i.e., contaminated or noncontaminated) is associated with each stock requisition, a characterization could be performed by a computer run. This approach would help track minimization effort effectiveness and would refine the characterization of DAW considerably

  17. Contamination awareness at the Dresden Nuclear Power Station

    International Nuclear Information System (INIS)

    Pagel, D.J.; Rath, W.C.

    1986-01-01

    Dresden Nuclear Power Station, which is located ∼ 60 miles southwest of Chicago near Morris, Illinois, has been generating electricity since 1960. Owned by Commonwealth Edison, Dresden was the nation's first privately financed nuclear station. On its site are three boiling water reactors (BWRs). Due to the contamination potential inherent with a reactor, a contamination trending program was created at the station. Studies had indicated a rise in contamination events during refueling outages. Further increases were due to specific work projects such as hydrolyzing operations. The investigations suggested that contract personnel also increased the number of events. In 1983, a contamination awareness program was created. The 1984 contamination awareness program was comprised of the following: (1) a statistical review in which trended contamination events were discussed. (2) A demonstration of protective clothing removal by an individual making various mistakes. (3) Scenarios were developed for use in mock work areas. (4) Upper management involvement. Because of the 1984 program, favorable attention has been focused on Dresden from the US Nuclear Regulatory Commission and the Institute of Nuclear Power Operations

  18. Pilot solar hybrid power station in rural area, Rompin, Pahang, Malaysia

    International Nuclear Information System (INIS)

    Iszuan Shah Syed Ismail; Azmi Omar; Hamdan Hassan

    2006-01-01

    Malaysia has considerable number of widely deployed small rural area. These hamlets are very much associated with Orang Asli residents. They get their source of energy by candle or kerosene light while some richer community can afford a generator set. The usual or normal system using solar as a source for electricity at rural area is standalone system for each house. As for this project, a pilot centralized solar power station will be the source of electricity to light up the fifteen houses at Kampung Denai, Rompin, Pahang, Malaysia. This system will be the first ever built for the orang asli settlement at Pahang. The objectives of this project are to design and install the solar power station at remote location and to develop standard design of stand-alone solar power station suitable for Malaysia. Orang Asli residents at Kampung Denai was chosen because there is a school for the Orang Asli children. Moreover, the remote communities are living in stratification, which makes electrical wiring easier. Furthermore, the remote area is far from the last transmission line and cumbersome to bring diesel through the rough and unpredictable land road. The main domestic energy is for residential purposes (e.g. small lighting unit, radio, television, video, etc). The generator capacity is 18.6 kW. The solar sizing was done both for the home and school appliances at Kampung Denai. The maximum demand measured was 4195.35 kW. The pilot centralized solar power station consists of 10 kW photovoltaic panels, 10 kW inverter, 150 kWh battery and other balance of system. A generator set with capacity of 12.5 kVA is installed for back up and during monsoon season. This paper will present status of the system, operational and maintenance issues, load profile of the solar power station and economics and system design of the whole system

  19. Energy balance and efficiency of power stations with a pulsed Tokamak reactor

    International Nuclear Information System (INIS)

    Davenport, P.A.; Mitchell, J.T.D.; Darvas, J.; Foerster, S.; Sack, B.

    1976-06-01

    The energy balance of a fusion power station based on the TOKAMAK concept is examined with the aid of a model comprising three distinct elements: the reactor, the energy converter and the reactor operation equipment. The efficiency of each element is expressed in terms of the various energy flows and the product of these efficiencies gives the net station efficiency. The analysis takes account of pulsed operation and has general applicability. Numerical values for the net station efficiency are derived from detailed estimates of the energy flows for a TOKAMAK reactor and its auxiliary equipment operating with advanced energy converters. The derivation of these estimates is given in eleven appendices. The calculated station efficiencies span ranges similar to those quoted for the current generation of fission reactors, though lower than those predicted for HTGR and LMFBR stations. Credible parameter domains for pulsed TOKAMAK operation are firmly delineated and factors inimical to improved performance are indicated. It is concluded that the net thermal efficiency of a TOKAMAK reactor power station based on present designs and using advanced thermal converters will be approximately 0.3 and is unlikely to exceed 0.33. (orig.) [de

  20. The local economic and social effects of power station siting: anticipated, demonstrated and perceived

    International Nuclear Information System (INIS)

    Glasson, J.

    1980-01-01

    The paper discusses the economic and social effects of power station siting at a local level using material based on the interim research findings from a project commissioned by the Central Electricity Generating Board. The cases for and against power station development are outlined and a review of the actual economic and social effects is presented, drawn from a study of a conventional power station at Drax and a nuclear power station at Sizewell. (U.K.)

  1. Flexible Software Design for Korean WA-DGNSS Reference Station

    Directory of Open Access Journals (Sweden)

    Wan Sik Choi

    2013-03-01

    Full Text Available In this paper, we describe the software design results of WA-DGNSS reference station that will be constructed in Korea in the near future. Software design of the WRS (Wide area Reference Station is carried out by applying object oriented software methodology in order to provide flexibilities: easy of model change (namely ionospheric delay model etc and system addition (Galileo, GLONASS in addition to GPS etc. Software design results include the use case diagrams for the functions to be executed, the architecture diagram showing components and their relationships, the activity diagrams of behaviors and models among them, and class diagrams describing the attribute and operation.

  2. Operational results in the Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Hasegawa, Kanichi; Kato, Katsuya; Terada, Hideo; Kamata, Takakage; Kaimura, Yoshiharu

    1986-01-01

    In the Onagawa Nuclear Power Station, Unit 1 (BWR type, with electric output 524 MW) started operation in June 1, 1984. The power plant has then continued non-stop operation up to April 2, 1985, thus exhibiting its base load plant. In fiscal 1984, the continuous operation is for 342 days; the capacity factor is about 96.1 %, which is the world's top. During the period, the radioactivity releases to the environment in both liquid and gaseous wastes are below the detection limits. The collective exposure dose for plant personnel is merely 6 man-rem. Subsequently, its 1st periodical inspection was started on April 3, 1985, and finished in July the same year. So, the power plant is now again in operation. (Mori, K.)

  3. Radiocarbon Mass Balance for a Magnox Nuclear Power Station

    International Nuclear Information System (INIS)

    Metcalfe, M.P.; Mills, R.W.

    2016-01-01

    Nuclear power generation in the United Kingdom is based principally on graphite-moderated gas-cooled reactors. The mass of irradiated graphite associated with these reactors, including material from associated experimental, prototype and production reactors, exceeds 96,000 tonnes. One of the principal long-lived radionuclides produced during graphite irradiation is radiocarbon (C-14), which has a half-life of 5730 ± 40 years. Decommissioning and graphite waste management strategies must take account of this radionuclide. In order to identify appropriate options for addressing the potential hazard of C-14, it is important that the production processes are understood and the distributions and concentrations of C-14 are characterised. In fact, C-14 precursors and their activation processes are well-known. However, there is ongoing debate over the relative importance of different C-14 precursors, which will determine the location of C-14 within graphite components and hence its mobility/response to treatment. A generally held misconception concerning C-14 in irradiated graphite is that generic statements can be made about its precursors and their location. C-14 location and activities will depend upon the composition of the original manufactured graphite (raw materials, impurities), the chemical environment of the graphite during service and the irradiation history of the graphite. So, while there may be some similarities across, for example, carbon dioxide cooled graphite moderated designs (Magnox, AGR, UNGG), any informed assessment of a core’s C-14 inventory would require more-precise characterisation. The analysis presented here focuses on a UK Magnox reactor core, Reactor 1 at Wylfa Nuclear Power Station. The objective of the analysis is to present a full C-14 mass balance over a selected period of operation for which there are accurate C-14 discharge records. The analysis presented here provides the first assessment of the principal C-14 activation pathways

  4. Training of technical staff for nuclear power station operation

    International Nuclear Information System (INIS)

    Haire, T.P.; Myerscough, P.B.

    1981-01-01

    The statutory training requirements covering the technical staff in the CEGB (Central Electricity Generating Board) are discussed. Details of the training programmes emphasize the importance of the staff having a thorough understanding of the nuclear processes involved in the station operation and not relying solely upon a mechanistic approach to operating procedures. The impact of this philosophy on the design of training simulators is examined and a brief comparison is made with the training philosophies in other countries. (U.K.)

  5. International lunar observatory / power station: from Hawaii to the Moon

    Science.gov (United States)

    Durst, S.

    -like lava flow geology adds to Mauna Kea / Moon similarities. Operating amidst the extinct volcano's fine grain lava and dust particles offers experience for major challenges posed by silicon-edged, powdery, deep and abundant lunar regolith. Power stations for lunar observatories, both robotic and low cost at first, are an immediate enabling necessity and will serve as a commercial-industrial driver for a wide range of lunar base technologies. Both microwave rectenna-transmitters and radio-optical telescopes, maybe 1-meter diameter, can be designed using the same, new ultra-lightweight materials. Five of the world's six major spacefaring powers - America, Russia, Japan, China and India, are located around Hawaii in the Pacific / Asia area. With Europe, which has many resources in the Pacific hemisphere including Arianespace offices in Tokyo and Singapore, they have 55-60% of the global population. New international business partnerships such as Sea Launch in the mid-Pacific, and national ventures like China's Hainan spaceport, Japan's Kiribati shuttle landing site, Australia and Indonesia's emerging launch sites, and Russia's Ekranoplane sea launcher / lander - all combine with still more and advancing technologies to provide the central Pacific a globally representative, state-of-the-art and profitable access to space in this new century. The astronomer / engineers tasked with operation of the lunar observatory / power station will be the first to voyage from Hawaii to the Moon, before this decade is out. Their scientific and technical training at the world's leading astronomical complex on the lunar-like landscape of Mauna Kea may be enhanced with the learning and transmission of local cultures. Following the astronomer / engineers, tourism and travel in the commercially and technologically dynamic Pacific hemisphere will open the new ocean of space to public access in the 21st century like they opened the old ocean of sea and air to Hawaii in the 20th - with Hawaii

  6. STUDY OF INFLUENCE OF WIND-POWER STATIONS ON BIRDS: ANALYSIS OF INTERNATIONAL PRACTICES

    Directory of Open Access Journals (Sweden)

    Gorlov P. I.

    2012-06-01

    Full Text Available The world experience of bird collisions with wind-power stations was analyzed. The detailcharacteristics of principal threats to the birds during building and exploitation of wind-power stations was done. Comparative analysis of factors caused annual birds mortality was performed. Some proposals of negative influence minimization were suggested for wind-power stations utilization.

  7. Novel wind powered electric vehicle charging station with vehicle-to-grid (V2G) connection capability

    International Nuclear Information System (INIS)

    Fathabadi, Hassan

    2017-01-01

    Highlights: • The only wind powered EV charging station reported in the literature. • The charging station maximally converts wind energy into electric energy. • Novel fast and highly accurate MPPT technique implemented in the EV charging station. • The charging station is grid-connected type with vehicle-to-grid (V2G) technology. • The charging station balances load demand in the grid connected to it. - Abstract: In this study, a novel grid-connected wind powered electric vehicle (EV) charging station with vehicle-to-grid (V2G) technology is designed and constructed. The wind powered EV charging station consists of a wind energy conversion system (WECS), a unidirectional DC/DC converter connected to the WECS, a maximum power point tracking (MPPT) controller, 15 bidirectional DC/DC converters dedicated to 15 charging stations provided for charging EVs, and a three-phase bidirectional DC/AC inverter connected to the grid. The contribution of this work is that the grid-connected wind powered EV charging station presented in this work is the only constructed EV charging station reported in the literature that uses wind energy as a renewable resource to produce electric energy for charging EVs, and moreover, it maximally converts wind energy into electric energy because it uses a novel fast and highly accurate MPPT technique proposed in this study. Other works are only simulated models without any new MPPT consideration. It is demonstrated that the constructed wind powered EV charging station is a perfect charging station that not only produces electric energy to charge EVs but also balances load demand in the grid connected to it.

  8. Daya Bay Nuclear Power Station operation and management indicators system

    International Nuclear Information System (INIS)

    Fang Chunfa

    2000-01-01

    Ever since the commercial operation of Daya Bay Nuclear Power Station (GNPS), dynamic objective management concept that features modern enterprises has been adopted by the station to manage all operational activities with the guidance of business plan. And some quantitative indicators have been employed in order to measure effectively the progress status of these operational activities. After several years' evolvement, a hierarchical and standard performance indicators system has been developed and is playing an active part in the plant's efforts towards top quartile of world nuclear power industry. Structured hierarchically with higher levels resolving into lower levels and lower levels committing to higher levels, the indicator system represents the corporate vision, WANO (World Association of Nuclear Operators) performance indicators, plant integrated indicators and departmental key indicators, covering such areas as safety, production, environment, human resource and cost control. The indicator system not only reflects performance-centered management concept, but also shows the controllability of the whole operational process of the station. Indicators of a certain level serve as both early warnings to superior indicators (lagging indicators in this case) and effects to inferior indicators (leading indicators in this case). The dynamic status of these indicators, numbered more than 230, will eventually be fed back to the business plan and realized through daily work of every branch, and even every member of the workforce. With the indicator system as a quantitative management tool, and an effective tracking system, GNPS has achieved great success in self-assessment, objective definition, improvement follow up, resource re-allocation, and management-staff communication. Periodic plant performance assessment is performed through spider chart and other pictorial diagrams. Indicators are displayed at the plant entrance, offices, Main Control Room and SIS network

  9. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  10. The Spanish Nuclear Safety Council and nuclear power stations in operation in Spain

    International Nuclear Information System (INIS)

    Perello, M.

    1984-01-01

    On 20 April 1980 the Spanish Congress of Deputies passed an Act setting up the Nuclear Safety Council (CSN) as the sole organization responsible for nuclear safety and radiation protection. In this paper it is stated that that date marked the beginning of a new nuclear safety policy in Spain. As one of its objectives, this policy is aimed at the monitoring and testing of operating nuclear installations. A detailed description is given of the Operating Nuclear Installation Service (SINE), including its basic structure, its functions and the technical and manpower resources available to it. The maintenance of close relations with other organs of the CSN is considered of paramount importance in order for the tasks allotted to SINE to be fulfilled. International co-operation and outside contracting greatly assist importing countries which have limited manpower resources. A description is then given of the present state of the nuclear power stations in operation in Spain together with an account of the most important initiatives which have been taken so far. The year 1968 saw the beginning of commercial operation of the Jose Cabrera nuclear power station, which has the only single-loop PWR reactor in the world. At present, it is being subjected to the Systematic Evaluation Programme (SEP). The Santa Maria de Garona nuclear power station has been operating for over twelve years and is also being subjected to the SEP although design modifications derived from operating experience have already been introduced. The Vandellos I station was the last of the first generation and has also benefited from the operating experience of similar French plants. Unit 1 of the Almaraz power station opens the door to the second generation and the generic problem which has occurred with the steam generators is in process of being solved. Lastly, some general conclusions are presented about the organization of and experience acquired with operating nuclear power stations. (author)

  11. Influence of the cost development in power station construction and operation on power station planning with special regard to the effects on electricity supply

    International Nuclear Information System (INIS)

    Krieb, K.H.; Frenzel, P.; Vogel, J.

    1974-01-01

    A survey on the present structure of thermal power facilities in the FRG is followed by a discussion of the development of power plant costs in the last few years. Also mentioned are the findings of studies of costs as a function of the power station size and the effects of the overall cost increase on the power generation costs of the last few years. Finally, a model conception for the development of power stations is presented which makes predictions about the future size of power stations and their constructional parts. (UA/AK) [de

  12. Expansion potential for existing nuclear power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Cope, D. F.; Bauman, H. F.

    1977-09-26

    This report is a preliminary analysis of the expansion potential of the existing nuclear power sites, in particular their potential for development into nuclear energy centers (NECs) of 10 (GW(e) or greater. The analysis is based primarily on matching the most important physical characteristics of a site against the dominating site criteria. Sites reviewed consist mainly of those in the 1974 through 1976 ERDA Nuclear Power Stations listings without regard to the present status of reactor construction plans. Also a small number of potential NEC sites that are not associated with existing power stations were reviewed. Each site was categorized in terms of its potential as: a dispersed site of 5 GW(e) or less; a mini-NEC of 5 to 10 GW(e); NECs of 10 to 20 GW(e); and large NECs of more than 20 GW(e). The sites were categorized on their ultimate potential without regard to political considerations that might restrain their development. The analysis indicates that nearly 40 percent of existing sites have potential for expansion to nuclear energy centers.

  13. Expansion potential for existing nuclear power station sites

    International Nuclear Information System (INIS)

    Cope, D.F.; Bauman, H.F.

    1977-01-01

    This report is a preliminary analysis of the expansion potential of the existing nuclear power sites, in particular their potential for development into nuclear energy centers (NECs) of 10 (GW(e) or greater. The analysis is based primarily on matching the most important physical characteristics of a site against the dominating site criteria. Sites reviewed consist mainly of those in the 1974 through 1976 ERDA Nuclear Power Stations listings without regard to the present status of reactor construction plans. Also a small number of potential NEC sites that are not associated with existing power stations were reviewed. Each site was categorized in terms of its potential as: a dispersed site of 5 GW(e) or less; a mini-NEC of 5 to 10 GW(e); NECs of 10 to 20 GW(e); and large NECs of more than 20 GW(e). The sites were categorized on their ultimate potential without regard to political considerations that might restrain their development. The analysis indicates that nearly 40 percent of existing sites have potential for expansion to nuclear energy centers

  14. Man-machine interface systems for the Sizewell B Nuclear Power Station

    International Nuclear Information System (INIS)

    Boettcher, D.B.

    2004-01-01

    Sizewell B is the first nuclear power station to be built in the United Kingdom using the Pressurised Water Reactor or PWR system. The design is based on stations operating in the United States, but many changes and new features have been introduced to bring it up to date, and to meet United Kingdom practice and regulatory requirements. The Man-Machine Interfaces (MMIs) in the control rooms have been newly designed from first principles, with special attention paid to human factors and the role of the operators. The instrumentation and control (1 and C) systems which interface the MMIs to the process plant, and automate the operation of the station, use advanced technology to achieve high performance and availability. This paper describes the development of the control rooms and 1 and C systems, explaining the thinking that lay behind the principal decisions. (author)

  15. Information relevant to ensuring that occupational radiation exposures at nuclear power stations will be as low as in reasonably achievable

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Regulations require that all reasonable efforts must be made to maintain exposure to radiation as far below the limits specified in 10 CFR Part 20 as is reasonably achievable. Information is provided relevant to attaining goals and objectives for planning, designing, constructing, operating and decommissioning a light-water-cooled nuclear power station to meet that criterion. Much of the information presented is also applicable to other than light-water-cooled nuclear power stations

  16. Guide to the collection and presentation of electrical, electronic, and sensing component reliability data for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This Guide is intended to establish a method of collecting and presenting reliability data for quantitative systematic reliability analysis in nuclear power generating stations, as outlined in IEEE Std 351-1975. Appendix D, which is not a part of IEEE Std 500-1977 but which comprises the bulk of this publication, presents tables of reliability data for nuclear power generating stations, intended for use of nuclear systems reliability analysts or design engineers

  17. Development of a compact nuclear power station engineering simulator

    International Nuclear Information System (INIS)

    Jian Jianfeng; Yang Yanhua; Lin Meng; Hu Rui

    2003-01-01

    The compact nuclear power plant project simulator is developed based on the Chashma nuclear power plant. This simulator consists of simulation computation code, data communication module and human-machine interface. This paper discusses the design and implementation of the simulator from such aspect as computer system, hydrothermal model, programming language, human-machine interface and data communication in details

  18. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Mawer, W.T.

    1982-11-01

    The cooling water system which would be needed for the proposed Sizewell B power station is described. The possible effects upon public safety, local fishing interests and the existing seabed are examined. Studies of the heat dispersion from outfalls, the location of offshore structures and the control of marine growth in the system are reported. Finally the essential service water system, the reserve ultimate heat sink, the discharge of liquid radioactive waste into the sea and the possible use of waste heat for agricultural and fish farming purposes are discussed. (U.K.)

  19. Weather-power station. Solar energy, wind energy, water energy

    Energy Technology Data Exchange (ETDEWEB)

    Schatta, M

    1975-10-02

    A combined power station is described, which enables one to convert solar energy and wind energy into other forms of energy. The plant consists of a water-filled boiler, in which solar energy heats the water by concentration, solar cells, and finally wind rotors, which transform wind energy into electrical energy. The transformed energy is partly available as steam heat, partly as mechanical or electrical energy. The plant can be used for supplying heating systems or electrolysis equipment. Finally, by incorporating suitable motors, a mobile version of the system can be produced.

  20. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Edmondson, B.

    1982-11-01

    A discussion is given on the safety issues for the pressure circuit components of the proposed Sizewell B nuclear power station. The detail of the evidence concentrates on the reactor pressure vessel itself, as the principal example of a component whose failure is considered incredible. The general background to construction and operation of pressurized plant is described. A description of the form of the vessel and its role is given. Each of the factors which lead to confidence in the integrity of the vessel is then considered. (U.K.)

  1. Human-factor operating concept for Borssele Nuclear Power Station

    International Nuclear Information System (INIS)

    Wieman, J.L.

    1995-01-01

    The safety level in the operation of a reactor is determined basically by human beings. The Borssele Nuclear Power Station has carried out measures for improving the man-machine interface through training and operating instructions for the shift personnel. The retrofitting of control technology relevant to safety engineering should avoid operating instructions which can cause potential failures. A safety study has shown that the remaining risk following all retrofitting measures remains dependent to the extent of 80% on human factors and that human factors as a whole have a positive effect on reactor safety. (orig.) [de

  2. Analytical modeling of nuclear power station operator reliability

    International Nuclear Information System (INIS)

    Sabri, Z.A.; Husseiny, A.A.

    1979-01-01

    The operator-plant interface is a critical component of power stations which requires the formulation of mathematical models to be applied in plant reliability analysis. The human model introduced here is based on cybernetic interactions and allows for use of available data from psychological experiments, hot and cold training and normal operation. The operator model is identified and integrated in the control and protection systems. The availability and reliability are given for different segments of the operator task and for specific periods of the operator life: namely, training, operation and vigilance or near retirement periods. The results can be easily and directly incorporated in system reliability analysis. (author)

  3. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  4. Sizewell 'B' power station public inquiry. CEGB proof of evidence

    International Nuclear Information System (INIS)

    Flint, R.A.

    1982-11-01

    The NNC cost estimates for the construction of the Sizewell B nuclear power station are discussed and the methods employed in their preparation are described. The preparation of the estimates for each of the major divisions of cost are outlined. These divisions are: civil engineering and building works; nuclear steam supply system; NNC costs; turbine generators; other mechanical plant; other electrical plant. The uncertainties which exist in making these estimates are discussed and the cost allowances which must be made as a result are outlined. (U.K.)

  5. Possible radiation injury at Koeberg Nuclear Power Station

    International Nuclear Information System (INIS)

    Van Rensburg, L.C.J.; De Villiers, B.; Van Zyl, C.J.

    1986-01-01

    Any injured patient from Koeberg Nuclear Power Station will be treated in the conventional manner as an acute surgical emergency; this has priority over decontamination. The ideal situation is decontamination at Koeberg before ambulance transferral to the Tygerberg Radiation Casualty Facility, but if this is not possible or complete, decontamination can be accomplished by a trained team in the unit. Teamwork is the essence at the place of injury, during transfer, in the decontamination area, in the operating theatre and during the postoperative phase. No surgical management is appropriate or complete without the very necessary guidance and advice from a physicist and the Advisory Group for Radiation Casualties

  6. Poultry litter power station in the United Kingdom

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Poultry litter has presented a waste disposal problem to the poultry industry in many parts of the United Kingdom. The plant at Eye is a small to medium scale power station, fired using poultry litter. The 12.7 MW of electricity generated is supplied, through the local utility, to the National Grid. The spent litter that constitutes the fuel is made up of excrement and animal bedding (usually 90% excrement and 10% straw or wood shavings). It comes from large climate-controlled buildings (broiler houses) where birds, reared for meat production, are allowed to roam freely. (UK)

  7. Kaiseraugst nuclear power station: meteorological effects of the cooling towers

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Considerations of water conservation persuaded the German Government in 1971 not to allow the use of the Aar and Rhine for direct cooling of nuclear power stations. The criticism is often made that the Kaiseraugst cooling towers were built without full consideration of the resulting meteorological effects. The criticism is considered unjustified because the Federal Cooling Tower Commission considered all the relevant aspects before making its recommendations in 1972. Test results and other considerations show that the effect of the kaiseraugst cooling towers on meteorological and climatic conditions is indeed minimal and details are given. (P.G.R.)

  8. Some problems concerning the radiation protection in nuclear power stations

    International Nuclear Information System (INIS)

    Bozoky, L.

    1977-01-01

    The appearance and fast spreading of the nuclear power stations raised new and difficult questions in connection with the theoretical bases of radiation protection. The new standpoint of the International Commission on Radiological Protection is that both the workers at a pile and the inhabitants take less risk because of ionizing radiation than they usually take in everyday life. The maximum dose which can be permitted remained 5 rem/year for those who professionally deal with ionizing radiation and 0.5 rem/year for the groups in special situation. (V.N.)

  9. Return to coal at the Champagne Soise power station

    Energy Technology Data Exchange (ETDEWEB)

    Feger, M

    1981-03-01

    This power station, which comprises two 250 MW units, which came on stream in 1961 and 1965, burned coal until 1970 and fuel oil until 1977 when it was decided to revert to coal. The author describes the work and modifications carried out for this purpose: internal changes to the boilers and burners, to the coal handling and crushing arrangements and overhauling of the de-dusters and auxiliary circuits. Gives details of the organization and planning of the work involved, plus costs and distribution of expenditure. Gives the operating results and concludes that the reconversion costs were paid off within the year. (In French)

  10. LAYOUT AND DESIGN OF ELECTROMOBILE CHARGING STATIONS AS URBAN ELEMENTS

    Directory of Open Access Journals (Sweden)

    Tomáš Chovan

    2015-12-01

    Full Text Available The contribution is dedicated to the processing of the problems of the insufficient charging for the electric vehicles within the concrete urbanistic centre. It brings a different perspective on the mobility, which is shown in the form of electric energy as the alternative for the needs of urbanization of the cities. It analyses electromobility, new technologies in the field of electric vehicles and the charging stations as the elements of the urbanism. In terms of the solution, the contribution is focused on the Košice city and the location of the public charging stations. Košice do not have sufficient amount of the public charging stations and until the 2014 there was only one public charging station. The contribution is focused on the designing of the parking places with the charging station placed on the appropriate parking places. The resulting design is created in the CAD system, it brings the view of the layout of the charging station at the shopping centre in the open space and in the parking house.

  11. The AP1000R nuclear power plant innovative features for extended station blackout mitigation

    International Nuclear Information System (INIS)

    Vereb, F.; Winters, J.; Schulz, T.; Cummins, E.; Oriani, L.

    2012-01-01

    Station Blackout (SBO) is defined as 'a condition wherein a nuclear power plant sustains a loss of all offsite electric power system concurrent with turbine trip and unavailability of all onsite emergency alternating current (AC) power system. Station blackout does not include the loss of available AC power to buses fed by station batteries through inverters or by alternate AC sources as defined in this section, nor does it assume a concurrent single failure or design basis accident...' in accordance with Reference 1. In this paper, the innovative features of the AP1000 plant design are described with their operation in the scenario of an extended station blackout event. General operation of the passive safety systems are described as well as the unique features which allow the AP1000 plant to cope for at least 7 days during station blackout. Points of emphasis will include: - Passive safety system operation during SBO - 'Fail-safe' nature of key passive safety system valves; automatically places the valve in a conservatively safe alignment even in case of multiple failures in all power supply systems, including normal AC and battery backup - Passive Spent Fuel Pool cooling and makeup water supply during SBO - Robustness of AP1000 plant due to the location of key systems, structures and components required for Safe Shutdown - Diverse means of supplying makeup water to the Passive Containment Cooling System (PCS) and the Spent Fuel Pool (SFP) through use of an engineered, safety-related piping interface and portable equipment, as well as with permanently installed onsite ancillary equipment. (authors)

  12. The AP1000{sup R} nuclear power plant innovative features for extended station blackout mitigation

    Energy Technology Data Exchange (ETDEWEB)

    Vereb, F.; Winters, J.; Schulz, T.; Cummins, E.; Oriani, L. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    Station Blackout (SBO) is defined as 'a condition wherein a nuclear power plant sustains a loss of all offsite electric power system concurrent with turbine trip and unavailability of all onsite emergency alternating current (AC) power system. Station blackout does not include the loss of available AC power to buses fed by station batteries through inverters or by alternate AC sources as defined in this section, nor does it assume a concurrent single failure or design basis accident...' in accordance with Reference 1. In this paper, the innovative features of the AP1000 plant design are described with their operation in the scenario of an extended station blackout event. General operation of the passive safety systems are described as well as the unique features which allow the AP1000 plant to cope for at least 7 days during station blackout. Points of emphasis will include: - Passive safety system operation during SBO - 'Fail-safe' nature of key passive safety system valves; automatically places the valve in a conservatively safe alignment even in case of multiple failures in all power supply systems, including normal AC and battery backup - Passive Spent Fuel Pool cooling and makeup water supply during SBO - Robustness of AP1000 plant due to the location of key systems, structures and components required for Safe Shutdown - Diverse means of supplying makeup water to the Passive Containment Cooling System (PCS) and the Spent Fuel Pool (SFP) through use of an engineered, safety-related piping interface and portable equipment, as well as with permanently installed onsite ancillary equipment. (authors)

  13. Safety of Ikata Nuclear Power Station from the accident of Three Mile Island

    International Nuclear Information System (INIS)

    Nonaka, Hiroshi

    1979-01-01

    The leak of radioactive substances occurred on March 28, 1979, in the No. 2 plant of Three Mile Island Nuclear Power Station, and this accident must be put to use to prevent similar accidents and to secure safety hereafter in the nuclear power stations being operated in Japan. In the TMI accident, too many problems concerning the operation management seemed to exist in a series of events. In this paper, a few matters related to the TMI accident among the aspects of the operation management in Ikata Nuclear Power Station are reported. As the problems of operation management, it is considered that the operation of the TMI plant was continued as the exit valve of auxiliary feed line was closed, that it took long time to close the root valve for a pressurizer relief valve manually, and that the ECCS was stopped manually. In TMI, the abnormal phenomenon of losing main feed water has occurred 6 times since the attainment of criticality in March, 1978, and the opening and sticking of pressurizer relief valves occurred at least twice in about 150 times of their actuation in the nuclear reactors designed by Babcock and Wilcox Co. In Ikata Nuclear Power Station, these problems are detected early and the suitable measures are taken immediately, therefore it never happens to continue the operation as the problems are left as they are. It is not conceivable that similar troubles occur many times. (Kako, I.)

  14. Design and installation of a strategically placed algae mesh barrier at OPG Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Marttila, D.; Patrick, P.; Gregoris, C.

    2009-01-01

    Ontario Power Generation's Pickering Nuclear has experienced a number of events in which attached algae have become entrained in the water intake costing approximately $30M over the 1995-2005 period as a result of deratings, Unit shutdowns and other operational issues. In 2005-2006 OPG and Kinectrics worked collaboratively on evaluating different potential solutions to reduce the impact of algae on the station. One of the solutions developed by Kinectrics included a strategically placed barrier net designed to regulate algae flow into the station intake. In 2006, Kinectrics designed and installed the system, the first of its kind at a Nuclear Power Plant in Canada. The system was operational by May 2007. OPG completed an effectiveness study in 2007 and concluded the barrier system had a beneficial effect on reducing algae impact on the station. (author)

  15. Electrical system design and reliability at Ontario Hydro nuclear generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Royce, C. J. [Ontario Hydro, 700 University Avenue, Toronto, Ontario M5G 1X6 (Canada)

    1986-02-15

    This paper provides an overview of design practice and the predicted and actual reliability of electrical station service Systems at Ontario Nuclear Generating Stations. Operational experience and licensing changes have indicated the desirability of improving reliability in certain instances. For example, the requirement to start large emergency coolant injection pumps resulted in the turbine generator units in a multi-unit station being used as a back-up power supply. Results of reliability analyses are discussed. To mitigate the effects of common mode events Ontario Hydro adopted a 'two group' approach to the design of safety related Systems. This 'two group' approach is reviewed and a single fully environmentally qualified standby power supply is proposed for future use. (author)

  16. Space Station Freedom pressurized element interior design process

    Science.gov (United States)

    Hopson, George D.; Aaron, John; Grant, Richard L.

    1990-01-01

    The process used to develop the on-orbit working and living environment of the Space Station Freedom has some very unique constraints and conditions to satisfy. The goal is to provide maximum efficiency and utilization of the available space, in on-orbit, zero G conditions that establishes a comfortable, productive, and safe working environment for the crew. The Space Station Freedom on-orbit living and working space can be divided into support for three major functions: (1) operations, maintenance, and management of the station; (2) conduct of experiments, both directly in the laboratories and remotely for experiments outside the pressurized environment; and (3) crew related functions for food preparation, housekeeping, storage, personal hygiene, health maintenance, zero G environment conditioning, and individual privacy, and rest. The process used to implement these functions, the major requirements driving the design, unique considerations and constraints that influence the design, and summaries of the analysis performed to establish the current configurations are described. Sketches and pictures showing the layout and internal arrangement of the Nodes, U.S. Laboratory and Habitation modules identify the current design relationships of the common and unique station housekeeping subsystems. The crew facilities, work stations, food preparation and eating areas (galley and wardroom), and exercise/health maintenance configurations, waste management and personal hygiene area configuration are shown. U.S. Laboratory experiment facilities and maintenance work areas planned to support the wide variety and mixtures of life science and materials processing payloads are described.

  17. Isar-2 nuclear power station twenty-five years

    International Nuclear Information System (INIS)

    Fischer, Erwin; Luginger, Markus

    2013-01-01

    The Isar-2 nuclear power station (KKI 2) began commercial power operation on April 9, 1988. In these past 25 years the plant generated a total of approx. 285 billion kWh of electricity. The annual electricity production of KKI 2 of approx. 12 billion kWh corresponds to a share of approx. 15 % in the cumulated Bavarian electricity production. This amount of electricity, theoretically, could supply some 3 million three person households, or meet two thirds of the electricity requirement of the Bavarian industry, for one year. In its 25 years of power operation the Isar-2 nuclear power plant has recorded the highest annual gross electricity production of all nuclear power plants in the world nine times so far. A plant performance as impressive as this necessitates a plant availability far above the average. This, in turn, is based on short revision times and faultfree plant operation. However, high plant safety and availability must not be taken for granted, but are the result of responsible, safety-minded plant operation combined with continuous plant optimization and permanent execution of comprehensive checks, inspections, and maintenance measures. Besides plant technology also organization and administration were permanently advanced and adapted to changing requirements so as to safeguard reliable, safe, and non-polluting plant operation.

  18. Procedures for permission of installation of nuclear power stations

    International Nuclear Information System (INIS)

    Narita, Yoriaki

    1980-01-01

    The locations of atomic power stations are first selected by electric power enterprises in consultation with the Ministry of International Trade and Industry or under the guidance of authorities concerned. The surveys of the climate, topography, water and plants in the planned sites and the influences of nuclear power generation to the surrounding areas are made by the enterprisers under the administrative guidance of the MITI. Secondly, the basic project shall be submitted to and decided by the Power Resource Development Council headed by the Prime Minister (Article 10, the Power Resource Development Law). The Council shall, if necessary, call for the attendance of the governors of prefectures concerned and hear their opinions (Article 11, the Law). As the third and most complicated phase, various procedures include; (a) permission of the changes of electrical facilities under the Electricity Enterprises Act; (b) authorization of the installation of reactors under the Nuclear Reactor Regulation Law; (c) permission or authorization under other regulations including the Agricultural Land Act, etc.; (d) additional procedures related to the indemnification to fishery and so forth. Finally the reactors are to be operated after receiving the certificates of the Minister of ITI on the inspections of construction works, nuclear fuel materials used for the reactors and welding processes of reactor containment vessels, boilers, turbines, etc. (Okada, K.)

  19. Assuring benefits from advanced mathematical modeling of fossil power stations

    International Nuclear Information System (INIS)

    Divakaruni, S.M.; Hottenstine, R.D.

    1990-01-01

    Although the capability to model power plants and power plant control systems has progressed rapidly during the last two decades, the quality of control found in the best controlled stations of the 1960's and 1970's has not been improved to any great extent as a result of the improved hardware and the systems presently being installed. This paper presents a review of the probable reasons for the limited success in transferring good dynamic modeling technology into useful benefits for the power industry. The authors suggest that a major reason for this lack of success is a lack of understanding of the needs and the present capabilities of the power industry by the modeling community. They establish a state-of-the-art power plant control to assist investigators in directing their efforts toward true needs and to assist them in judging the potential for improvement through their efforts to utilize improved dynamic analysis methods. The United States has already initiated an effort to improve the transfer of technology into beneficial use in the utility industry and it is suggested that the methods they have developed can be used for improvement on an international scale

  20. Public relations activities of the Service Hall for Kashiwazaki-Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kono, T.

    1998-01-01

    This article includes information of the Service Hall for Kashiwazaki-Kariwa Nuclear Power Station. About 30% of the total electricity production in Japan is due to 16 power stations and 52 reactors. The service hall is a kind of atomic power pavilion for public relations. In Japan, each nuclear power station has such a pavilion, which acts a a center of public relations activities for the atomic power. (S. Grainger)