WorldWideScience

Sample records for power reactor vver

  1. Developing the European Center of Competence on VVER-Type Nuclear Power Reactors

    Science.gov (United States)

    Geraskin, Nikolay; Pironkov, Lyubomir; Kulikov, Evgeny; Glebov, Vasily

    2017-01-01

    This paper presents the results of the European educational projects CORONA and CORONA-II which are dedicated to preserving and further developing nuclear knowledge and competencies in the area of VVER-type nuclear power reactors technologies (Water-Water Energetic Reactor, WWER or VVER). The development of the European Center of Competence for…

  2. Safety of VVER-440 reactors

    CERN Document Server

    Slugen, Vladimir

    2011-01-01

    Safety of VVER-440 Reactors endeavours to promote an increase in the safety of VVER-440 nuclear reactors via the improvement of fission products limitation systems and the implementation of special non-destructive spectroscopic methods for materials testing. All theoretical and experimental studies performed the by author over the last 25 years have been undertaken with the aim of improving VVER-440 defence in depth, which is one of the most important principle for ensuring safety in nuclear power plants. Safety of VVER-440 Reactors is focused on the barrier system through which the safety pri

  3. Advanced designs of VVER reactor plant

    International Nuclear Information System (INIS)

    Mokhov, V.A.

    2010-01-01

    The history of VVER reactors, current challenges and approaches to the challenges are highlighted. The VVER-1200 reactor of 3+ generation for AES-2006 units are under construction at the Leningrad 2 nuclear power plant (LNPP-2). The main parameters are listed and details are presented of the vessel, steam generator, and improved fuel. The issue of the NPP safety is discussed. Additional topics include the MIR-1200 reactor unit, VVER-600, and VVER-SCP (Generation 4). (P.A.)

  4. Burnup Estimation of Rhodium Self-Powered Neutron Detector Emitter in VVER Reactor Core Using Monte Carlo Simulations

    OpenAIRE

    Khrutchinsky, А. А.; Kuten, S. A.; Babichev, L. F.

    2011-01-01

    Estimation of burn-up in a rhodium-103 emitter of self-powered neutron detector in VVER-1000 reactor core has been performed using Monte Carlo simulations within approximation of a constant neutron flux.

  5. Feasibility and usefulness of reconstructing obsolete power blocks of VVER-440 reactors

    International Nuclear Information System (INIS)

    Kirichenko, A.M.; Krushenik, S.D.; Sigal, M.V.; Kustov, V.P.

    1993-01-01

    At the present time, in Russia and in the East European countries there are atomic power stations with first-generation VVER-440 reactors built according to specification which no longer satisfy the more rigorous modern safety standards. Among these power stations are, in particular, the Novovoronezh and the Armenian Atomic Power Station and two blocks of the Kola Atomic Power Station. The search for technical solutions for modernizing these power blocks is complicated because two conditions which are hard to reconcile must be fulfilled: an acceptable safety level must be obtained and the rebuilding must be economically justifiable (particularly since the time of operation of a power block until its standard service life is over is short). Research work undertaken in the All-Union Scientific Research Institute of Atomic Power Stations has shown that one way of overcoming these difficulties may involve changing the operating conditions of the reactor assembly to a less demanding mode of operation. This solution implies an economically justified minimum of structural improvements, provides the required safety level, and prolongs the service life of the power block. The reduction of the thermal power, and consequently, the necessary transfer of a power block to another option

  6. Structural strength during severe reactor accidents of the VVER- 91 nuclear power plant

    International Nuclear Information System (INIS)

    Varpasuo, P.

    1999-12-01

    The report summarises the studies carried out in Fortum Engineering (formerly IVO Power Engineering) between the years of 1992 and 1997 concerning ultimate strength of structures designed to mitigate and contain the consequences of various core melt accident scenarios. The report begins with the description of containment loading situations arising from core melt accidents. These situations are divided to fast and slow loads. Fast loads include ex-vessel steam explosions, steam spikes, hydrogen burns, direct containment heating and missiles. Slow loads are connected with pressure rise inside the containment in case when the containment heat removal system is not functioning. First part of report describes the analyses of reactor cavity based on axi-symmetric load assumptions. These studies are performed with various models like one degree of freedom idealisation, axi-symmetric modelling of geometry and full three-dimensional modelling of geometry. Second part of report describes the analyses of cavity based on non-axi-symmetric load assumptions. Here full 3D- geometry model is used combined with various physical models for the behaviour of reinforced concrete. Third part of report gives short account of the analysis of containment ultimate pressure capacity. The containment model in this case includes pre-stressing tendons and mild steel reinforcing bars. The load is assumed to axi-symmetric internal static pressure. The capacity of the reactor cavity against the ex-vessel steam explosion scenarios for VVER-91 plant concept is established for both axi-symmetric and non-axi-symmetric load models using ANACAP structural analysis code. The validation of the cavity response to ex-vessel steam explosion load using different commercially available codes gave mixed results for both axisymmetric and non-axi-symmetric load presentations.The ultimate static overpressure capacity of the VVER-91 reactor cavity structure was established to be of the order of 10 MPa. This result

  7. The most extensive reconstruction of nuclear power plant with VVER 440/V230 reactor

    International Nuclear Information System (INIS)

    Ferenc, M.

    2000-01-01

    The nuclear power plant V-1 Bohunice consists of two VVER-440 units with V-230 reactors. Unit 1 was commissioned in 1978 and Unit 2 in 1980. Large experience and knowledge from the operation of previous units with V-230 reactors were incorporated into the V-1 design, which resulted in a higher level of safety and operational reliability of these units. The Siemens company which won an international bidding process developed these basic goals for the Gradual Upgrading into the so called Basic Engineering (BE). For the implementation of the Gradual Upgrading in line with the BE, Rekon consortium was established consisting of Siemens and VUJE. The implementation of the Gradual Upgrading is scheduled for the time period of 1996 - 2000. Siemens was responsible for the upgrading strategy - based on the approved results of the basic engineering phase and the PSAR, the engineering and realization of all I and C improvements, and also for the seismic upgrade. VUJE's responsibility covered the detailed engineering and implementation of mechanical, electrical and civil part of upgrading measures as well as overall organisation and evaluation of verification tests. The consortium awarded contracts for final planning and design, installation services and commissioning to other Slovakian subcontractors in order to ensure the largest possible local content. The gradual reconstruction of the V-1 Bohunice with V230 reactors represents a comprehensive reconstruction of safety-related systems and equipment. Following its completion, the units will be operated with a safety level accepted internationally. (author)

  8. Determination of power density in VVER-1000 Mock-Up in LR-0 reactor

    Directory of Open Access Journals (Sweden)

    Košál Michal

    2017-01-01

    Full Text Available The pin power density is an important quantity which has to be monitored during the reactor operation, for two main reasons. Firstly, it is part of the limits and conditions of safe operation and, secondly, it is source term in neutron transport calculations used for the adequate assessing of the state of core structures and pressure vessel material. It is often calculated using deterministic codes which may have problems with an adequate definition of boundary conditions in subcritical regions. This may lead to overestimation of real situation, and therefore the validation of the utility codes contributes not only to better fuel utilization, but also to more precise description of radiation situation in structural components of core. Current paper presents methods developed at LR-0 reactor, as well as selected results for pin power density measurement in peripheral regions of VVER-1000 mock-up. The presented data show that the results of a utility diffusion code at core boundary overestimate the measurement. This situation, however satisfactory safe, may lead to unduly conservative approach in the determination of radiation damage of core structures.

  9. Results of VVER fuel rods tests in the MIR.M1 reactor under power cycling conditions

    International Nuclear Information System (INIS)

    Burukin, A.; Izhutov, A.; Ovchinnikov, V.; Kalygin, V.; Markov, D.; Pimenov, Y.; Novikov, V.; Medvedev, A.; Nesterov, B.

    2011-01-01

    The paper presents the main results of the 50 ... 60 MWd/kgU burnup VVER fuel rods tests performed in the MIR.M1 reactor loop facilities under power cycling. The non-destructive PIE results are presented as well. A series of experiments was performed, including overall measurement of fuel rod parameters test, in one of which 300 cycles were done. Irradiation under power cycling conditions and PIE of high-burnup VVER fuel rods showed the following: 1) all fuel rods claddings preserved their integrity under irradiation at linear heat rate (LHR) higher than the NPP operating one; 2) experimental data were obtained on the axial and radial cladding strain and fission gas release (FGR) from 50 ... 60 MWd/kgU burnup VVER-440 and VVER-1000 fuel rods as well as on the kinetics of the change in these parameters and fuel temperature under the power cycling; 3) non-destructive PIE results are in a satisfactory correlation with the data obtained by means of in-pile measurement gages during irradiation. (authors)

  10. United States Department of Energy's reactor core protection evaluation methodology for fires at RBMK and VVER nuclear power plants. Revision 1

    International Nuclear Information System (INIS)

    1997-06-01

    This document provides operators of Soviet-designed RBMK (graphite moderated light water boiling water reactor) and VVER (pressurized light water reactor) nuclear power plants with a systematic Methodology to qualitatively evaluate plant response to fires and to identify remedies to protect the reactor core from fire-initiated damage

  11. Fuel designs for VVER reactors

    International Nuclear Information System (INIS)

    Simonov, K.V.; Carbon, P.; Silberstein, A.

    1995-01-01

    That progresses in efficiency and safety through progresses in technology and better prediction with fully benchmarked upgraded computer codes is a common goal for on the one hand the original designer of the VVER reactors and their respective fuels and on the other hand for EVF a western company resulting from a combined force with highly diversified and complementary talents in reactor and fuel design and manufacturing. It can be expected that this new challenge and dialogue between the two Russian and European industrial ventures will be mutually beneficial and yield innovative and high quality products and as a consequence strong return will be produced for the best interest of utilities operating VVER reactors. (orig./HP)

  12. Several perspectives on water-chemical cycles for nuclear power stations equipped with type VVER and RBMK reactors

    International Nuclear Information System (INIS)

    Mamet, A.P.; Mamet, V.A.; Pashevich, V.I.; Nazarenko, P.N.

    1982-01-01

    Water-chemical cycles for loops I and II of VVER reactors are discussed. These cycles are mixed ammonia-sodium with a variable concentration of boric acid and ammonia hydrazine with a pH factor of 9.1 +/- 0.1. New water-chemical cycles are considered for use in both existing and new nuclear power plants. Application of these new water-chemical cycles showed produce a significant improvement in operating conditions of nuclear power plants. Upon accumulation of sufficient operating experience with these cycles, it should be possible to raise the issue of revising applicable standard documentation

  13. Possible emission of radioactive fission products during off-design accidents at a nuclear power plant with VVER-1000 reactor

    International Nuclear Information System (INIS)

    Dubkov, A.P.; Kozlov, V.F.; Luzanova, L.M.

    1995-01-01

    It is well known that eight nuclear power plants with VVER-1000 reactors have been constructed in Russia, Ukraine, and in the Republic of Belarus and they have been operating successfully without any serious accidents since 1980. These facilities have been analyzed for various accident scenarios, and measures have been incorporated which will prevent core damage during these possible events. However, an off-design accident can occur, and in such a case, the radiological consequences would exceed the worst design accidents. This paper reviews a number of potential off-design accidents in order to develop an accident plan to mitigate the consequences of such an accident

  14. Study, analysis, assess and compare the nuclear engineering systems of nuclear power plant with different reactor types VVER-1000, namely AES-91, AES-92 and AES-2006

    International Nuclear Information System (INIS)

    Le Van Hong; Tran Chi Thanh; Hoang Minh Giang; Le Dai Dien; Nguyen Nhi Dien; Nguyen Minh Tuan

    2015-01-01

    On November 25, 2009, in Hanoi, the National Assembly had been approved the resolution about policy for investment of nuclear power project in Ninh Thuan province which include two sites, each site has two units with power around 1000 MWe. For the nuclear power project at Ninh Thuan 1, Vietnam Government signed the Joint-Governmental Agreement with Russian Government for building the nuclear power plant with reactor type VVER. At present time, the Russian Consultant proposed four reactor technologies can be used for Ninh Thuan 1 project, namely: AES-91, AES-92, AES-2006/V491 and AES-2006/V392M. This report presents the main reactor engineering systems of nuclear power plants with VVER-1000/1200. The results from analysis, comparison and assessment between the designs of AES-91, AES-92 and AES-2006 are also presented. The obtained results show that the type AES-2006 is appropriate selection for Vietnam. (author)

  15. Implementation of New Reactivity Measurement System and New Reactor Noise Analysis Equipment in a VVER-440 Nuclear Power Plant

    Science.gov (United States)

    Vegh, János; Kiss, Sándor; Lipcsei, Sándor; Horvath, Csaba; Pos, István; Kiss, Gábor

    2010-10-01

    The paper deals with two recently developed, high-precision nuclear measurement systems installed at the VVER-440 units of the Hungarian Paks NPP. Both developments were motivated by the reactor power increase to 108%, and by the planned plant service time extension. The first part describes the RMR start-up reactivity measurement system with advanced services. High-precision picoampere meters were installed at each reactor unit and measured ionization chamber current signals are handled by a portable computer providing data acquisition and online reactivity calculation service. Detailed offline evaluation and analysis of reactor start-up measurements can be performed on the portable unit, too. The second part of the paper describes a new reactor noise diagnostics system using state-of-the-art data acquisition hardware and signal processing methods. Details of the new reactor noise measurement evaluation software are also outlined. Noise diagnostics at Paks NPP is a standard tool for core anomaly detection and for long-term noise trend monitoring. Regular application of these systems is illustrated by real plant data, e.g., results of standard reactivity measurements during a reactor startup session are given. Noise applications are also illustrated by real plant measurements; results of core anomaly detection are presented.

  16. Special features of embrittlement of welded joints in shells of VVER-type reactors

    International Nuclear Information System (INIS)

    Kasatkin, O.G.

    1999-01-01

    At present, the atomic power engineering of Russia and Ukraine is based on water-water energy reactors of the VVER-440 and VVER-1000 type, with the electric power of 440 and 1000 MW, respectively. The majority of the VVER-440 reactors are installed in Russia, and VVER-1000 reactors operate in Ukraine. The reactors' shell (RS) is produced from cylindrical shells and a dished end welded together by circular joints under a flux. The RS of the VVER-440 reactor is produced from 15Kh3MFA steel, and the VVER-1000 reactors are produced from 15Kh2NMFA steel. The shell of the VVER-1000 reactor has an internal austenite coating. The condition of the RS metal is determined mainly by the critical brittleness temperature T b at which the impact toughness of specimens with a sharp notch reaches 60 J/cm 2 . The energy reactors, working in western countries, are characterised by a service life of 40 years and discussion is being carried out to extend this lifetime to 60 years. The design service life of the domestic reactors varies from 30 (RS VVER-440) to 40 (RS VVER-1000) years. According to investigations, the service life of the shells of these reactors is restricted by the properties of welded joints which are characterised by higher susceptibility to embrittlement than that of the parent metal, especially due to a higher content in the weld of phosphorus (RS VVER-440) or nickel (RS VVER-1000). Therefore, some experts believe that the actual service life of the RS is shorter than the design life. The accurate evaluation of the service life of welded joints in the RS is very important for the safety of service and also in the economic aspects, because the unjustified decrease of the permissible service life and premature shutdown of units of the nuclear power station result in huge losses

  17. Almost twenty years' search of transuranium isotopes in effluents discharged to air from nuclear power plants with VVER reactors.

    Science.gov (United States)

    Hölgye, Z; Filgas, R

    2006-04-01

    Airborne effluents of 5 stacks (stacks 1-5) of three nuclear power plants, with 9 pressurized water reactors VVER of 4,520 MWe total power, were searched for transuranium isotopes in different time periods. The search started in 1985. The subject of this work is a presentation of discharge data for the period of 1998-2003 and a final evaluation. It was found that 238Pu, 239,240Pu, 241Am, 242Cm, and 244Cm can be present in airborne effluents. Transuranium isotope contents in most of the quarterly effluent samples from stacks 2, 4 and 5 were not measurable. Transuranium isotopes were present in the effluents from stack l during all 9 years of the study and from stack 3 since the 3rd quarter of 1996 as a result of a defect in the fuel cladding. A relatively high increase of transuranium isotopes in effluents from stack 3 occurred in the 3rd quarter of 1999, and a smaller increase occurred in the 3rd quarter of 2003. In each instance 242Cm prevailed in the transuranium isotope mixtures. 238Pu/239,240Pu, 241Am/239,240Pu, 242Cm/239,240Pu, and 244Cm/239,240Pu ratios in fuel for different burn-up were calculated, and comparison of these ratios in fuel and effluents was performed.

  18. Fuel for new Russian reactor VVER-1200

    Energy Technology Data Exchange (ETDEWEB)

    Vasilchenko, Ivan Nikitovich [GRPress, 21, Ordzhonikidze Street, 142103 Podolsk, Moscow region (Russian Federation)

    2009-06-15

    A great program is accepted in Russia on increasing the nuclear power capacities. The basis of the program is commissioning of VVER-1200 Units of AES-2006 design. This is largely an evolutionary project of VVER-1000 reactor plant. It is referred also to reactor core. The plant electric power is increased due to increase in the reactor thermal power and forcing the main parameters and the efficiency increase. With this, reactor pressure increases from 15,7 to 16,2 MPa. The reactor inlet temperature increases from 290 deg. C to 298 deg. C, and outlet temperature from 319 deg. C to 329 deg. C. In a set of the design for four Units (2 Units at Novovoronezh NPP and 2 Units at Leningrad NPP) two base fuel cycles are developed: 5 year and 3 year. To provide such fuel cycles the fuel loading is increased by 8 tons, as compared to VVER-1000 base design, due to fuel column increase by 200 mm and change of fuel pellet sizes. In the mentioned fuel cycles the average burnup in the unloaded batch will be {approx}57 MW.day/kg U and 52 MW.day/kg U (maximum burnup over FAs is 64,5 MW.day/kg U and 60,3 MW.day/kg U), respectively. Specific consumption of natural uranium will be reduced by 5% as compared to that reached at VVER-1000 reactor. In spite of increase in Unit power the limiting permissible fuel rod linear heat rate is decreased from 448 W/cm to 420 W/cm. Refueling pattern is used with small neutron escape. The safety criteria are used that were established for VVER-1000, except for those that did not comply with EUR. For instance, the number of leaky fuel rods under accident is limited. The more stringent requirements are stated on efficiency margin of CPS rods for reactor shutdown that is ensured by the increased number of CPS rods. The well-proved design of fuel assembly TVS-2 and its close modification TVS-2M, operated at Balakovo NPP and Rostov NPP, is laid down in the basis of the core design. The load-carrying component of this structure is a rigid skeleton formed by

  19. VIPRE modeling of VVER-1000 reactor core for DNB analyses

    Energy Technology Data Exchange (ETDEWEB)

    Sung, Y.; Nguyen, Q. [Westinghouse Electric Corporation, Pittsburgh, PA (United States); Cizek, J. [Nuclear Research Institute, Prague, (Czech Republic)

    1995-09-01

    Based on the one-pass modeling approach, the hot channels and the VVER-1000 reactor core can be modeled in 30 channels for DNB analyses using the VIPRE-01/MOD02 (VIPRE) code (VIPRE is owned by Electric Power Research Institute, Palo Alto, California). The VIPRE one-pass model does not compromise any accuracy in the hot channel local fluid conditions. Extensive qualifications include sensitivity studies of radial noding and crossflow parameters and comparisons with the results from THINC and CALOPEA subchannel codes. The qualifications confirm that the VIPRE code with the Westinghouse modeling method provides good computational performance and accuracy for VVER-1000 DNB analyses.

  20. Application of a Russian nuclear reactor simulator VVER-1000

    International Nuclear Information System (INIS)

    Lopez-Peniche S, A.; Salazar S, E.

    2012-10-01

    The objective of the present work is to give to know the most important characteristics in the Russian nuclear reactor of pressurized light water VVER-1000, doing emphasis in the differences that has with the western equivalent the reactor PWR in the design and the safety systems. Therefore, a description of the computerized simulation of the reactor VVER-1000 developed by the company Eniko TSO that the International Atomic of Energy Agency distributes to the states members with academic purposes will take place. The simulator includes mathematical models that represent to the essential systems in the real nuclear power plant, for what is possible to reproduce common faults and transitory characteristic of the nuclear industry with a behavior sufficiently attached to the reality. In this work is analyzed the response of the system before a turbine shot. After the accident in the nuclear power plant of Three Mile Island (US) they have been carried out improvements in the design of the reactor PWR and their safety systems. To know the reach and the limitations of the program, the events that gave place to this accident will be reproduced in the simulator VVER-1000. With base to the results of the simulation we will conclude that so reliable is the response of the safety system of this reactor. (Author)

  1. Application of a Russian nuclear reactor simulator VVER-1000; Aplicacion de un simulador de reactor nuclear ruso VVER-1000

    Energy Technology Data Exchange (ETDEWEB)

    Lopez-Peniche S, A. [UNAM, Facultad de Ingenieria, Circuito Interior, Ciudad Universitaria, 04360 Mexico D. F. (Mexico); Salazar S, E., E-mail: alpsordo@hotmail.com [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Laboratorio de Analisis en Ingenieria de Reactores Nucleares, 62250 Jiutepec, Morelos (Mexico)

    2012-10-15

    The objective of the present work is to give to know the most important characteristics in the Russian nuclear reactor of pressurized light water VVER-1000, doing emphasis in the differences that has with the western equivalent the reactor PWR in the design and the safety systems. Therefore, a description of the computerized simulation of the reactor VVER-1000 developed by the company Eniko TSO that the International Atomic of Energy Agency distributes to the states members with academic purposes will take place. The simulator includes mathematical models that represent to the essential systems in the real nuclear power plant, for what is possible to reproduce common faults and transitory characteristic of the nuclear industry with a behavior sufficiently attached to the reality. In this work is analyzed the response of the system before a turbine shot. After the accident in the nuclear power plant of Three Mile Island (US) they have been carried out improvements in the design of the reactor PWR and their safety systems. To know the reach and the limitations of the program, the events that gave place to this accident will be reproduced in the simulator VVER-1000. With base to the results of the simulation we will conclude that so reliable is the response of the safety system of this reactor. (Author)

  2. Problems and prospects connected with development of high-temperature filtration technology at nuclear power plants equipped with VVER-1000 reactors

    Science.gov (United States)

    Shchelik, S. V.; Pavlov, A. S.

    2013-07-01

    Results of work on restoring the service properties of filtering material used in the high-temperature reactor coolant purification system of a VVER-1000 reactor are presented. A quantitative assessment is given to the effect from subjecting a high-temperature sorbent to backwashing operations carried out with the use of regular capacities available in the design process circuit in the first years of operation of Unit 3 at the Kalinin nuclear power plant. Approaches to optimizing this process are suggested. A conceptual idea about comprehensively solving the problem of achieving more efficient and safe operation of the high-temperature active water treatment system (AWT-1) on a nuclear power industry-wide scale is outlined.

  3. Borate compound content reduction in liquid radioactive waste from nuclear power plants with VVER reactor

    International Nuclear Information System (INIS)

    Szalo, A.; Zatkulak, M.

    2000-01-01

    This paper describes the current status of liquid waste (evaporator concentrates) inventory at V-1 and V-2 NPPs in Jaslovske Bohunice and the intention to separate boron from them with respect to waste minimisation and improvement of physical and chemical properties for further waste treatment and conditioning. Preliminary results of laboratory experiments concerned to borate crystallisation after pH adjustment with nitric or formic acid performed in the 1998 are given. At the present time laboratory experiments continuing - next acids, coagulation with carbon oxide, electrolytic process, ion exchange resin, study of decontamination factors, immobilization of boric acid, decrease radioactivity, purification of boron-contained compounds. Slovenske Elektrarne have accumulated 7,000 m 3 of evaporator concentrates containing 100-180 g/l borate. In order to make more storage space available, it is proposed to remove some of the borate in the liquor by precipitation as sodium tetraborate and immobilise in either cement of bitumen. The supernate can be further volume reduced by evaporation and returned to the tanks. Slovenske Elektrarne are currently evaluating acid addition to the pH 12-13 concentrate to reduce the borate solubility. However, this adds to the salt burden of the waste through this chemical addition -thus creating future increases in conditioning and disposal costs. Boric acid is used in pressurized water as a soluble neutron poison to control reactivity and also to assure a safety margin in the spent fuel pool and during refuelling operations. Boric acid is also present in the water reserved for injection into the reactor in the event of postulated accidents. (author)

  4. Nuclear fuel for VVER reactors. Actual state and trends

    International Nuclear Information System (INIS)

    Molchanov, V.

    2011-01-01

    The main tasks concerning development of FA design, development and modernization of structural materials, improvement of technology of structural materials manufacturing and FA fabrication and development of methods and codes are discussed in this paper. The main features and expected benefit of implementation of second generation and third generation fuel assembly for VVER-440 Nuclear Fuel are given. A brief review of VVER-440 and VVER-1000 Nuclear Fuel development before 1997 since 2010 is shown. A summary of VVER-440 and VVER-1000 Nuclear Fuel Today, including details about TVSA-PLUS, TVSA-ALFA, TVSA-12 and NPP-2006 Phase 2 tasks (2010-2012) is presented. In conclusion, as a result of large scope of R and D performed by leading enterprises of nuclear industry modern nuclear fuel for VVER reactors is developed, implemented and successfully operated. Fuel performance (burnup, lifetime, fuel cycles, operating reliability, etc.) meets the level of world's producers of nuclear fuel for commercial reactors

  5. Optimization of fuel core loading pattern design in a VVER nuclear power reactors using Particle Swarm Optimization (PSO)

    International Nuclear Information System (INIS)

    Babazadeh, Davood; Boroushaki, Mehrdad; Lucas, Caro

    2009-01-01

    The two main goals in core fuel loading pattern design optimization are maximizing the core effective multiplication factor (K eff ) in order to extract the maximum energy, and keeping the local power peaking factor (P q ) lower than a predetermined value to maintain fuel integrity. In this research, a new strategy based on Particle Swarm Optimization (PSO) algorithm has been developed to optimize the fuel core loading pattern in a typical VVER. The PSO algorithm presents a simple social model by inspiration from bird collective behavior in finding food. A modified version of PSO algorithm for discrete variables has been developed and implemented successfully for the multi-objective optimization of fuel loading pattern design with constraints of keeping P q lower than a predetermined value and maximizing K eff . This strategy has been accomplished using WIMSD and CITATION calculation codes. Simulation results show that this algorithm can help in the acquisition of a new pattern without contravention of the constraints.

  6. Radiolysis of the VVER-1000 reactor coolant: An experimental study and mathematical modeling

    International Nuclear Information System (INIS)

    Arkhipov, O.P.; Bugaenko, V.L.; Kabakchi, S.A.

    1995-01-01

    Variations in the composition of the coolant for the primary circuit of a VVER-1000 reactor of the Kalinin nuclear power plant upon transition from power-level operation to shutdown was studied experimentally. The data obtained were used for verification of the MORAVA-H2 program developed earlier for simulation of the coolant state in pressurized-water power reactors

  7. Refurbishing the reactor protection systems of VVER-440/230 and VVER-1000/320 nuclear power plants with exclusively digital IandC systems

    International Nuclear Information System (INIS)

    Martin, M.

    1997-01-01

    The refurbishment of reactor protection systems of nuclear power plants is based on two sets of requirements: engineering aspects such as performance, qualification and licensing, as well as interfaces to other systems; and cost-benefit relationships, ease of service and maintenance as well as installation during scheduled outages. A number of WWER-440 and WWER-1000 nuclear plants have announced their intention to refurbish their protection systems. Since 1994, these plants have been placing orders with Siemens for new protection systems, including the neutron flux monitoring system utilizing the advanced system TELEPERM XS. This exclusively digital IandC system provides an excellent foundation for the remaining plant service life

  8. VVER Reactor Safety in Eastern Europe and Former Soviet Union

    Science.gov (United States)

    Papadopoulou, Demetra

    2012-02-01

    VVER Soviet-designed reactors that operate in Eastern Europe and former Soviet republics have heightened international concern for years due to major safety deficiencies. The governments of countries with VVER reactors have invested millions of dollars toward improving the safety of their nuclear power plants. Most of these reactors will continue to operate for the foreseeable future since they provide urgently-needed electrical power. Given this situation, this paper assesses the radiological consequences of a major nuclear accident in Eastern Europe. The paper also chronicles the efforts launched by the international nuclear community to improve the safety of the reactors and notes the progress made so far through extensive collaborative efforts in Armenia, Bulgaria, the Czech Republic, Hungary, Kazakhstan, Lithuania, Russia, Slovakia, and Ukraine to reduce the risks of nuclear accidents. Western scientific and technical staff collaborated with these countries to improve the safety of their reactor operations by strengthening the ability of the regulator to perform its oversight function, installing safety equipment and technologies, investing time in safety training, and working diligently to establish an enduring safety culture. Still, continued safety improvement efforts are necessary to ensure safe operating practices and achieve timely phase-out of older plants.

  9. Validation of containment thermal hydraulic computer codes for VVER reactor

    Energy Technology Data Exchange (ETDEWEB)

    Jiri Macek; Lubomir Denk [Nuclear Research Institute Rez plc Thermal-Hydraulic Analyses Department CZ 250 68 Husinec-Rez (Czech Republic)

    2005-07-01

    Full text of publication follows: The Czech Republic operates 4 VVER-440 units, two VVER-1000 units are being finalized (one of them is undergoing commissioning). Thermal-hydraulics Department of the Nuclear Research Institute Rez performs accident analyses for these plants using a number of computer codes. To model the primary and secondary circuits behaviour the system codes ATHLET, CATHARE, RELAP, TRAC are applied. Containment and pressure-suppression system are modelled with COCOSYS and MELCOR codes, the reactor power calculations (point and space-neutron kinetics) are made with DYN3D, NESTLE and CDF codes (FLUENT, TRIO) are used for some specific problems.An integral part of the current Czech project 'New Energy Sources' is selection of a new nuclear source. Within this and the preceding projects financed by the Czech Ministry of Industry and Trade and the EU PHARE, the Department carries and has carried out the systematic validation of thermal-hydraulic and reactor physics computer codes applying data obtained on several experimental facilities as well as the real operational data. One of the important components of the VVER 440/213 NPP is its containment with pressure suppression system (bubble condenser). For safety analyses of this system, computer codes of the type MELCOR and COCOSYS are used in the Czech Republic. These codes were developed for containments of classic PWRs or BWRs. In order to apply these codes for VVER 440 systems, their validation on experimental facilities must be performed.The paper provides concise information on these activities of the NRI and its Thermal-hydraulics Department. The containment system of the VVER 440/213, its functions and approaches to solution of its safety is described with definition of acceptance criteria. A detailed example of the containment code validation on EREC Test facility (LOCA and MSLB) and the consequent utilisation of the results for a real NPP purposes is included. An approach to

  10. Accident management strategies for VVER-1000 reactors. Part 1: text

    International Nuclear Information System (INIS)

    Sdouz, G.; Sonneck, G.; Pachole, M.

    1994-10-01

    This report describes the effect of different accident management strategies on the onset, development and end of the core-concrete-interaction as well as on the containment integrity for a TMLB'-type sequence in a Pressurized Water Reactor of the type VVER- 1000. Using the computer code MARCH3 the following strategies were investigated: (1) One or more Spray and LP ECC Systems available with and without coolers after 10 hours (2) Inclusion of the reactor pressure vessel testing facility room to the cavity (3) Containment venting (4) External water supply and (5) Different electric power restoration times. The results show that some of these accident management measures will maintain the containment integrity and reduce the source term drastically, others will reduce the source term rate. For some measures final conclusions can only be given after complete source term calculations have been performed. (authors)

  11. VVANTAGE 6 - an advanced fuel assembly design for VVER reactors

    International Nuclear Information System (INIS)

    Doshi, P.K.; DeMario, E.E.; Knott, R.P.

    1993-01-01

    Over the last 25 years, Westinghouse fuel assemblies for pressurized water reactors (PWR's) have undergone significant changes to the current VANTAGE 5. VANTAGE 5 PWR fuel includes features such as removable top nozzles, debris filter bottom nozzles, low-pressure-drop zircaloy grids, zircaloy intermediate flow mixing grids, optimized fuel rods, in-fuel burnable absorbers, and increased burnup capability to region average values of 48000 MWD/MTU. These features have now been adopted to the VVER reactors. Westinghouse has completed conceptual designs for an advanced fuel assembly and other core components for VVER-1000 reactors known as VANTAGE 6. This report describes the VVANTAGE 6 fuel assembly design

  12. Radioactive release from VVER-1000 reactors after a terror attack

    International Nuclear Information System (INIS)

    Sdouz, G.

    2005-01-01

    Full text: One of the terror scenarios for nuclear power plants is a severe damage of the reactor containment caused by a plane crash or a missile. Due to the loss of electric power the cooling of the core is not maintained leading to a core melt accident. Normally in the course of severe accidents an intact containment has the ability to retain a large part of the radioactive inventory. The goal of this work is the investigation of the behavior of the radioactive release from a VVER-1000-type reactor during a severe accident with a large containment leak from the beginning of the accident. The results are compared with the release in a severe accident via a very small leakage due to the untightness of the containment. This work supplements a series of studies investigating the behavior of a VVER-1000-type reactor during severe accidents under different accident management strategies. The focus in this study is on the 'station blackout'-sequence (or TMLB' in the WASH-1400 nomenclature). The calculations were performed using the Source Term Code Package (STCP), hydrogen explosions are not considered. Up to the melt-through of the cavity bottom the thermal-hydraulics phenomena are almost identical to the TMLB'-case with an intact containment from the beginning. The phenomena occur slightly delayed due to the large containment leak. When the core-concrete-interaction begins the resulting gases leave the containment through the large leak and do not cause a pressure increase. The containment pressure remains at ambient pressure. Due to the different behavior and to the different release times of the nuclides the deviations to the scenario with an intact containment show a great variety. From this comparison it can be shown that the intact containment retains the nuclides up to a factor of 6000. (author)

  13. Research on loading pattern optimization for VVER reactor

    International Nuclear Information System (INIS)

    Tran Viet Phu; Nguyen Thi Mai Huong; Nguyen Huu Tiep; Ta Duy Long; Tran Vinh Thanh; Tran Hoai Nam

    2017-01-01

    A study on fuel loading pattern optimization of a VVER reactor was performed. In this study, a core physics simulator was developed based on a multi-group diffusion theory for the use in the problem of fuel loading optimization of VVER reactors. The core simulator could handle the triangular meshes of the core and the computational speed is fast. Verification of the core simulator was confirmed against a benchmark problem of a VVER-1000 reactor. Several optimization methods such as DS, SA, TS and a combination of them were investigated and implemented in coupling with the core simulator. Calculations was performed for optimizing the fuel loading pattern of the core using these methods based on a benchmark core model in comparison with the reference core. Comparison among these methods have shown that a combination of SA+TS is the most effective for the problem of fuel loading pattern optimization. Advanced methods are being researched continuously. (author)

  14. Interactive nuclear plant analyzer for VVER-440 reactor

    International Nuclear Information System (INIS)

    Shier, W.; Horak, W.; Kennett, R.

    1992-05-01

    This document discusses an interactive nuclear plant analyzer (NPA) which has been developed for a VVER-440, Model 213 reactor for use in the training of plant personnel, the development and verification of plant operating procedures, and in the analysis of various anticipated operational occurrences and accident scenarios. This NPA is operational on an IBM RISC-6000 workstation and utilizes the RELAP5/MOD2 computer code for the calculation of the VVER-440 reactor response to the interactive commands initiated by the NPA operator

  15. Simulation of a nuclear accident by an academic simulator of a VVER-1000 reactor; Simulacion de un accidente nuclear, mediante un simulador academico de un reactor VVER-1000

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez G, L. [UNAM, Facultad de Ingenieria, Ciudad Universitaria, 04510 Mexico D. F. (Mexico); Salazar S, E., E-mail: laurahg42@gmail.com [UNAM, Facultad de Ingenieria, Laboratorio de Analisis en Ingenieria de Reactores Nucleares, 62250 Jiutepec, Morelos (Mexico)

    2014-10-15

    This work is planned to simulate a scenario in which the same conditions that caused the accident at the Fukushima Daichi nuclear power plant are present, using a simulator of a nuclear power plant with VVER-1000 reactor, a different type of technology to the NPP where the accident occurred, which used BWR reactors. The software where it will take place the simulation was created and distributed by the IAEA for academic purposes, which contains the essential systems that characterize this type of NPP. The simulator has tools for the analysis of the characteristic phenomena of a VVER-1000 reactor in the different systems together and planned training tasks. This makes possible to identify the function of each component and how connects to other systems, thus facilitating the visualization of possible failures and the consequences that they have on the general behavior of the reactor. To program the conditions in the simulator, is necessary to know and synthesize a series of events occurred in Fukushima in 2011 and the realized maneuvers to reduce the effects of the system failures. Being different technologies interpretation of the changes that would suffer the VVER systems in the scenario in question will be developed. The Fukushima accident was characterized by the power loss of regular supply and emergency of the cooling systems which resulted in an increase in reactor temperature and subsequent fusion of their nuclei. Is interesting to reproduce this type of failure in a VVER, and extrapolate the lack of power supply in the systems that comprise, as well as pumping systems for cooling, has a pressure regulating system which involves more variables in the balance of the system. (Author)

  16. ASTEC applications to VVER-440/V213 reactors

    Energy Technology Data Exchange (ETDEWEB)

    Matejovic, Peter, E-mail: ivstt@nextra.sk; Barnak, Miroslav; Bachraty, Milan; Vranka, Lubomir

    2014-06-01

    Since the beginning of ASTEC development by IRSN and GRS the code was widely applied to VVER reactors. In this paper, at first specific features of VVER-440/V213 reactor design that are important from the modelling point of view are briefly described. Then the validation of ASTEC code with focus on its applicability to VVER reactors is briefly summarised and the results obtained with the ASTEC V2.0-rev1 version for the ISP-33 PACTEL natural circulation experiment are presented. In the next section the application of ASTEC V2.0-rev1 code in upgrade of VVER-440/V213 NPPs to cope with consequences of severe accidents is described. This upgrade includes adoption of in-vessel retention via external reactor vessel cooling and installation of large capacity passive autocatalytic recombiners. Results of analysis with focus on corium localisation and stabilisation inside reactor vessel, hydrogen control in confinement and prevention of long-term confinement pressurisation are presented.

  17. Proposal of a benchmark for core burnup calculations for a VVER-1000 reactor core

    International Nuclear Information System (INIS)

    Loetsch, T.; Khalimonchuk, V.; Kuchin, A.

    2009-01-01

    In the framework of a project supported by the German BMU the code DYN3D should be further validated and verified. During the work a lack of a benchmark on core burnup calculations for VVER-1000 reactors was noticed. Such a benchmark is useful for validating and verifying the whole package of codes and data libraries for reactor physics calculations including fuel assembly modelling, fuel assembly data preparation, few group data parametrisation and reactor core modelling. The benchmark proposed specifies the core loading patterns of burnup cycles for a VVER-1000 reactor core as well as a set of operational data such as load follow, boron concentration in the coolant, cycle length, measured reactivity coefficients and power density distributions. The reactor core characteristics chosen for comparison and the first results obtained during the work with the reactor physics code DYN3D are presented. This work presents the continuation of efforts of the projects mentioned to estimate the accuracy of calculated characteristics of VVER-1000 reactor cores. In addition, the codes used for reactor physics calculations of safety related reactor core characteristics should be validated and verified for the cases in which they are to be used. This is significant for safety related evaluations and assessments carried out in the framework of licensing and supervision procedures in the field of reactor physics. (authors)

  18. Investigations of SPND noise signals in VVER-440 reactors

    International Nuclear Information System (INIS)

    Kiss, S.; Lipcsei, S.; Hazi, G.

    2001-01-01

    This paper describes and characterises SPND noise measurements of an operating VVER-440 nuclear reactor. Characteristics of the signal can be radically influenced by the geometrical properties of the detector and the cable and by the measuring arrangement. Structure of phase spectra showing propagating perturbations measured on uncompensated SPN detectors is studied through models.(author)

  19. VVER-440 and VVER-1000 reactor dosimetry benchmark - BUGLE-96 versus ALPAN VII.0

    International Nuclear Information System (INIS)

    Duo, J. I.

    2011-01-01

    Document available in abstract form only, full text of document follows: Analytical results of the vodo-vodyanoi energetichesky reactor-(VVER-) 440 and VVER-1000 reactor dosimetry benchmarks developed from engineering mockups at the Nuclear Research Inst. Rez LR-0 reactor are discussed. These benchmarks provide accurate determination of radiation field parameters in the vicinity and over the thickness of the reactor pressure vessel. Measurements are compared to calculated results with two sets of tools: TORT discrete ordinates code and BUGLE-96 cross-section library versus the newly Westinghouse-developed RAPTOR-M3G and ALPAN VII.0. The parallel code RAPTOR-M3G enables detailed neutron distributions in energy and space in reduced computational time. ALPAN VII.0 cross-section library is based on ENDF/B-VII.0 and is designed for reactor dosimetry applications. It uses a unique broad group structure to enhance resolution in thermal-neutron-energy range compared to other analogous libraries. The comparison of fast neutron (E > 0.5 MeV) results shows good agreement (within 10%) between BUGLE-96 and ALPAN VII.O libraries. Furthermore, the results compare well with analogous results of participants of the REDOS program (2005). Finally, the analytical results for fast neutrons agree within 15% with the measurements, for most locations in all three mockups. In general, however, the analytical results underestimate the attenuation through the reactor pressure vessel thickness compared to the measurements. (authors)

  20. Examination of VVER-1000 Reactor Pressure Vessel

    International Nuclear Information System (INIS)

    Matokovic, A.; Picek, E.; Markulin, K.

    2008-01-01

    The increasing demand of a higher level of safety in the operation of the nuclear power plants requires the utilisation of more precise automated equipment to perform in-service inspections. That has been achieved by technological advances in computer technology, in robotics, in examination probe technology with the development of the advanced inspection technique and has also been due to the considerable and varied experience gained in the performance of such inspections. In-service inspection of reactor pressure vessel, especially Russian-designed WWER-1000 presents one of the most important and extensive examination of nuclear power plants primary circuit components. Such examination demand high standards of inspection technology, quality and continual innovation in the field of non-destructive testing advanced technology. A remote underwater contact ultrasonic technique is employed for the examination of the base metal of vessel and reactor welds, whence eddy current method is applied for clad surface examinations. Visual testing is used for examination of the vessel interior. The movement of inspection probes and data positioning are assured by using new reactor pressure vessel tool concept that is fully integrated with inspection systems. The successful performance of reactor pressure vessel is attributed thorough pre-outage planning, training and successful performance demonstration qualification of chosen non-destructive techniques on the specimens with artificial and/or real defects. Furthermore, use of advanced approach of inspection through implementation the state-of-the-art examination equipment significantly reduced the inspection time, radiation exposure to examination personnel, shortening nuclear power plant outage and cutting the total inspection costs. This paper presents advanced approach in the reactor pressure vessel in-service inspections and it is especially developed for WWER-1000 nuclear power plants.(author)

  1. Stresses in transition region of VVER-1000 reactor vessels

    Energy Technology Data Exchange (ETDEWEB)

    Namgung, I. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of); Nguye, T.L. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of); National Research Inst. of Mechanical Engineering, Hanoi City, Vietnam (China)

    2014-07-01

    Most of the western PWR reactor's bottom head is hemi-spherical shape, however for Russian designed VVER family of reactor it is ellipsoidal shape. The transition region from shell side to ellipsoidal head and transition top flange to cylindrical shell develop higher stress concentration than western PWR reactor vessel. This region can be modeled as conical shell with varying thickness. The theoretical derivation of stress in the thick-walled conical cylinder with varying thickness was developed and shown in detail. The results is applied to VVER-1000 reactor vessel of which shell to bottom ellipsoidal shell and shell to upper flange were investigated for stress field. The theoretical calculations were also compared with FEM solutions. An axisymmetric 3D model of VVER-1000 reactor vessel (without closure head) FEM model was created and internal hydrostatic pressure boundary condition was applied. The stress results from FEM and theoretical calculation were compared, and the discrepancies and accuracies of the theoretical results were discussed. (author)

  2. Stresses in transition region of VVER-1000 reactor vessels

    International Nuclear Information System (INIS)

    Namgung, I.; Nguye, T.L.

    2014-01-01

    Most of the western PWR reactor's bottom head is hemi-spherical shape, however for Russian designed VVER family of reactor it is ellipsoidal shape. The transition region from shell side to ellipsoidal head and transition top flange to cylindrical shell develop higher stress concentration than western PWR reactor vessel. This region can be modeled as conical shell with varying thickness. The theoretical derivation of stress in the thick-walled conical cylinder with varying thickness was developed and shown in detail. The results is applied to VVER-1000 reactor vessel of which shell to bottom ellipsoidal shell and shell to upper flange were investigated for stress field. The theoretical calculations were also compared with FEM solutions. An axisymmetric 3D model of VVER-1000 reactor vessel (without closure head) FEM model was created and internal hydrostatic pressure boundary condition was applied. The stress results from FEM and theoretical calculation were compared, and the discrepancies and accuracies of the theoretical results were discussed. (author)

  3. Radionuclide inventory calculation in VVER and BWR reactor

    International Nuclear Information System (INIS)

    Bouhaddane, A.; Farkas, F.; Slugen, V.; Ackermann, L.; Schienbein, M.

    2014-01-01

    The paper shows different aspects in the radionuclide inventory determination. Precise determination of the neutron flux distribution, presented for a BRW reactor, is vital for the activation calculations. The precision can be improved utilizing variance reduction methods as importance treatment, weight windows etc. Direct calculation of the radionuclide inventory via Monte Carlo code is presented for a VVER reactor. Burn-up option utilized in this calculation appears to be proper for reactor internal components. However, it will not be probably effective outside the reactor core. Further calculations in this area are required to support the forth-set findings. (authors)

  4. Simulation of a nuclear accident by an academic simulator of a VVER-1000 reactor

    International Nuclear Information System (INIS)

    Hernandez G, L.; Salazar S, E.

    2014-10-01

    This work is planned to simulate a scenario in which the same conditions that caused the accident at the Fukushima Daichi nuclear power plant are present, using a simulator of a nuclear power plant with VVER-1000 reactor, a different type of technology to the NPP where the accident occurred, which used BWR reactors. The software where it will take place the simulation was created and distributed by the IAEA for academic purposes, which contains the essential systems that characterize this type of NPP. The simulator has tools for the analysis of the characteristic phenomena of a VVER-1000 reactor in the different systems together and planned training tasks. This makes possible to identify the function of each component and how connects to other systems, thus facilitating the visualization of possible failures and the consequences that they have on the general behavior of the reactor. To program the conditions in the simulator, is necessary to know and synthesize a series of events occurred in Fukushima in 2011 and the realized maneuvers to reduce the effects of the system failures. Being different technologies interpretation of the changes that would suffer the VVER systems in the scenario in question will be developed. The Fukushima accident was characterized by the power loss of regular supply and emergency of the cooling systems which resulted in an increase in reactor temperature and subsequent fusion of their nuclei. Is interesting to reproduce this type of failure in a VVER, and extrapolate the lack of power supply in the systems that comprise, as well as pumping systems for cooling, has a pressure regulating system which involves more variables in the balance of the system. (Author)

  5. Interactive nuclear plant analyzer for the VVER-440 reactor

    International Nuclear Information System (INIS)

    Shier, W.; Kennett, R.

    1993-01-01

    An interactive nuclear plant analyzer (NPA) has been developed for a VVER-440 model 213 reactor for use in the training of plant personnel, the development and verification of plant operating procedures, and in the analysis of various anticipated operational occurrences and accident scenarios. This NPA is operational on an IBM RISC-6000 workstation and utilizes the RELAP5/MOD2 computer code for the calculation of the VVER-440 reactor response to the interactive commands initiated by the NPA operator. Results of the interactive calculation can be through the user-defined, digital display of various plant parameters and through color changes that reflect changes in primary system fluid temperatures, fuel and clad temperatures, and the temperatures of other metal structures. In addition, changes in the status of various components and system can be initiated and/or displayed both numerically and graphically on the mask

  6. Simulation of mixing effects in a VVER-1000 reactor

    International Nuclear Information System (INIS)

    Ulrich Bieder; Gauthier Fauchet; Sylvie Betin; Nikola Kolev; Dimitar Popov

    2005-01-01

    Full text of publication follows: The work presented has been performed in the framework of the OECD/NEA thermalhydraulic benchmark V1000CT-2. This benchmark is related to fluid mixing in the reactor vessel during a MSLB accident scenario in a VVER-1000 reactor. The purpose of the first exercise is to test the capability of CFD codes to represent the coolant mixing in the reactor vessel, in particular in the downcomer and the lower plenum. Coolant mixing in a VVER-1000 V320 reactor was investigated in plant experiments during the commissioning of Kozloduy Unit 5 and 6. Starting from nearly symmetric states, asymmetric loop operation in different combinations was caused by disturbing the steam flow from one or more steam generators. Non-uniform and asymmetric loop flow mixing in the reactor vessel has been observed in the event of asymmetric loop operation. For certain flow patterns there is a shift (swirl) of the main loop flows with respect to the cold leg axes. This azimuthal shift as well as mixing coefficients from cold legs to the fuel assembly inlets have been measured. The presented reference problem is a pure TH problem with given boundary conditions and power distributions. During a stabilization phase, the thermal power of the reactor was 281 MW i.e. 9.36% of the nominal power according to primary balance. Then, a transient was initiated by closing the steam isolation valve of the steam generator one (SG-1) and isolating SG-1 from feed water. The coolant temperature in the cold and hot legs of Loop no 1 rose by 13-13.5 C. After about 20 minutes a stabilized state was reached which is considered as 'final state'. This final state has been analysed with the Trio-U code. Trio-U is a CFD code developed by the CEA Grenoble, aimed to supply an efficient computational tool to simulate transient thermalhydraulic mono-phase turbulent flows encountered in nuclear systems as well as in industrial processes. For the presented study, a LES approach was used. Therefore

  7. Transmutation of actinides in power reactors.

    Science.gov (United States)

    Bergelson, B R; Gerasimov, A S; Tikhomirov, G V

    2005-01-01

    Power reactors can be used for partial short-term transmutation of radwaste. This transmutation is beneficial in terms of subsequent storage conditions for spent fuel in long-term storage facilities. CANDU-type reactors can transmute the main minor actinides from two or three reactors of the VVER-1000 type. A VVER-1000-type reactor can operate in a self-service mode with transmutation of its own actinides.

  8. Detailed modeling of KALININ-3 NPP VVER-1000 reactor pressure vessel by the coupled system code ATHLET/BIPR-VVER

    International Nuclear Information System (INIS)

    Nikonov, S.P.; Velkov, K.; Pautz, A.

    2011-01-01

    The paper gives an overview of the recent developments of a new reactor pressure vessel (RPV) model of VVER-1000 for the coupled system code ATHLET/BIPR-VVER. Based on the previous experience a methodology is worked out for modeling the RPV in a pseudo-3D way with the help of a multiple parallel thermal-hydraulic channel scheme that follows the hexagonal fuel assembly structure from the bottom to the top of the reactor. The results of the first application of the new modeling are discussed on the base of the OECD/NEA coupled code benchmark for Kalinin-3 NPP transient. Coolant mass flow distributions in reactor volume of VVER 1000 reactor are presented and discussed. It is shown that along the core height a mass flow re-distribution of the coolant takes place starting approximately at an axial layer located 1 meter below the core outlet. (author)

  9. Safety enhancement concept for NPP of new generation with VVER reactors

    International Nuclear Information System (INIS)

    Bezlepkin, V.; Kukhtevich, I.; Semashko, S.; Svetlov, S.; Solodovnikov, A.

    2004-01-01

    With the present day conditions, in order to successfully promote new NPP designs in the electric power markets, it is necessary to ensure enhanced technical/economic performances provided that international safety requirements are properly adhered to. When compared with high-powered nuclear power plants, NPP VVER-640 design (medium powered) possesses a number of advantages for the regions with undeveloped energy systems. Reduced specific energy intensity of the core adopted in this type of reactor allows to ensure the emergency cooldown of the reactor plant by passive means and to minimize the 'human factor' risk and external effects and provide sound substantiations as to how to retain corium inside RPV in case of severe accidents. At the same time, high-powered NPPs seem to be promising for regions with developed energy systems. Among such designs, NPP VVER-1000 and VVER-1500 designs are the most desirable. Configuration of new generation NPP with VVER-1500 is to be selected based on the gained experience in designing NPPs of previous generations considering the latest safety requirements and situation in the domestic and global energy markets for the time being and in the short run. Recent IAEA publications and latest EUR requirements insist that the following key safety indices should be established for new NPP designs: - aggregated frequency of core melting is 10 -6 (1/year); - frequency of maximum accident release is 10 -7 (1/year). To meet the aforementioned criteria, it is necessary to implement some safety assurance principles recommended by IAEA (in-depth defence, single failure, redundancy, diversity, etc.), application of deterministic and probabilistic methods for selection of safety assurance activities and means and use of reasonable combination of active and passive systems. Application of VVER-640 concept to high-powered NPPs seems to be a formidable task due to a number of reasons, namely, it is quite difficult to carry out cooldown process

  10. Automatic loading pattern optimization tool for Loviisa VVER-440 reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kuopanportti, Jaakko [Fortum Power and Heat, Fortum (Finland). Nuclear Competence Center

    2013-09-15

    An automatic loading pattern optimization tool called ALPOT has been developed for Loviisa VVER-440 reactors. The ALPOT code utilizes combination of three different optimization methods. The first method is the imitation of the equilibrium pattern that is the optimized pattern in case the cycle length and the operation conditions are constant and the same shuffling pattern is repeated from cycle to cycle. In practice, the algorithm imitates assemblies' operation year distribution of the equilibrium pattern stochastically. The function of the imitation algorithm is to provide initial patterns quickly for the next optimization phase, which is performed either with the stochastic guided binary search algorithm or the deterministic burnup kernel method depending on the choice of the user. The former is a modified version of the standard binary search. The standard version goes through all possible swaps of the assemblies and chooses the best swap at each iteration round. The guided version chooses one assembly, tries to swap it with every other possible assembly and performs the best swap at each iteration round. The search is guided so that the algorithm chooses the assemblies at or near the most restrictive fuel assembly first. The kernel method creates burnup kernel functions to estimate burnup variations that are required to achieve desired changes in the power distribution of the reactor. The idea of the kernel method is first determine the optimal burnup distribution that minimizes the maximum relative assembly power using the created kernel functions and a common solver routine. Then, the burnups of the available fuel assemblies are matched with the obtained burnup distribution. (orig.)

  11. Automatic loading pattern optimization tool for Loviisa VVER-440 reactors

    International Nuclear Information System (INIS)

    Kuopanportti, Jaakko

    2013-01-01

    An automatic loading pattern optimization tool called ALPOT has been developed for Loviisa VVER-440 reactors. The ALPOT code utilizes combination of three different optimization methods. The first method is the imitation of the equilibrium pattern that is the optimized pattern in case the cycle length and the operation conditions are constant and the same shuffling pattern is repeated from cycle to cycle. In practice, the algorithm imitates assemblies' operation year distribution of the equilibrium pattern stochastically. The function of the imitation algorithm is to provide initial patterns quickly for the next optimization phase, which is performed either with the stochastic guided binary search algorithm or the deterministic burnup kernel method depending on the choice of the user. The former is a modified version of the standard binary search. The standard version goes through all possible swaps of the assemblies and chooses the best swap at each iteration round. The guided version chooses one assembly, tries to swap it with every other possible assembly and performs the best swap at each iteration round. The search is guided so that the algorithm chooses the assemblies at or near the most restrictive fuel assembly first. The kernel method creates burnup kernel functions to estimate burnup variations that are required to achieve desired changes in the power distribution of the reactor. The idea of the kernel method is first determine the optimal burnup distribution that minimizes the maximum relative assembly power using the created kernel functions and a common solver routine. Then, the burnups of the available fuel assemblies are matched with the obtained burnup distribution. (orig.)

  12. Three-dimensional reactor dynamics code for VVER type nuclear reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kyrki-Rajamaeki, R. [VTT Energy, Espoo (Finland)

    1995-10-01

    A three-dimensional reactor dynamics computer code has been developed, validated and applied for transient and accident analyses of VVER type nuclear reactors. This code, HEXTRAN, is a part of the reactor physics and dynamics calculation system of the Technical Research Centre of Finland, VTT. HEXTRAN models accurately the VVER core with hexagonal fuel assemblies. The code uses advanced mathematical methods in spatial and time discretization of neutronics, heat transfer and the two-phase flow equations of hydraulics. It includes all the experience of VTT from 20 years on the accurate three-dimensional static reactor physics as well as on the one-dimensional reactor dynamics. The dynamic coupling with the thermal hydraulic system code SMABRE also allows the VVER circuit-modelling experience to be included in the analyses. (79 refs.).

  13. Three-dimensional reactor dynamics code for VVER type nuclear reactors

    International Nuclear Information System (INIS)

    Kyrki-Rajamaeki, R.

    1995-10-01

    A three-dimensional reactor dynamics computer code has been developed, validated and applied for transient and accident analyses of VVER type nuclear reactors. This code, HEXTRAN, is a part of the reactor physics and dynamics calculation system of the Technical Research Centre of Finland, VTT. HEXTRAN models accurately the VVER core with hexagonal fuel assemblies. The code uses advanced mathematical methods in spatial and time discretization of neutronics, heat transfer and the two-phase flow equations of hydraulics. It includes all the experience of VTT from 20 years on the accurate three-dimensional static reactor physics as well as on the one-dimensional reactor dynamics. The dynamic coupling with the thermal hydraulic system code SMABRE also allows the VVER circuit-modelling experience to be included in the analyses. (79 refs.)

  14. Analysing The Thermalhydraulic Parameters Of VVER-1000 Reactor For The Accident Of Steam Generator Tube Rupture

    International Nuclear Information System (INIS)

    Luu Nam Hai; Truong Cong Thang

    2011-01-01

    To ensure the safety operation of nuclear power plant (NPP), a lot of postulated accident scenarios were considered and analysed. This research chose and analysed the accident of steam generator tube rupture (SGTR) under the actual plant conditions by using the simulation program PCTRAN. The SGTR accident is happen when the NPP is under operation with the steady state condition (power of 3000 MWth, primary pressure of 157 bar and secondary pressure of 63 bar). The accident is initiated by creating a break with equivalent diameter of 100 mm in the area of lower row heat exchanging tubes. The result of analysis is compared with the calculation of the Shariz University, Iran using the thermal hydraulics code RELAP5/mod3.2 and the report in the PSAR data of VVER-1000. This comparison shows that it is possible for using PCTRAN to analyse accidents of VVER-1000 reactor. (author)

  15. MOCA, Criticality of VVER Reactor Hexagonal Fuel Assemblies

    International Nuclear Information System (INIS)

    KYNCL, Jan

    1994-01-01

    1 - Description of program or function: Criticality problem in neutron transport for hexagonal fuel assembly in VVER nuclear reactor. The assembly is assumed to be either arranged in an infinite hexagonal array or placed in vacuum. The problem is solved in three- dimensional geometry, using standard energy group formalism and assuming that effective scattering cross sections are presented as Legendre polynomial expansions. The code evaluates ten different physical quantities, e.g. multiplication factor, neutron flux per energy group and spatial zone, integrated over angle and power in any zone of the assembly. 2 - Method of solution: Monte Carlo method of successive generations is applied. Computation proceeds according to an analog random process. The code is organized into three blocks: In the first block, the input data are converted to quantities for use in the Monte Carlo calculation. An initial neutron distribution is calculated, which corresponds to a fission spectrum uniform in spatial and angular variables. The main calculations are carried out in the second block (subroutine PROC2). This block is subdivided into geometrical and physical parts. Neutron tracks in individual zones and groups as well as probabilities for the formation of secondary neutrons are calculated. In the third block (subroutine PROC3), the results are evaluated statistically. Effective multiplication coefficients, the neutron flux per group and zone, and respective errors are computed. These quantities serve as a basis for the evaluation of other quantities. The results are either printed or stored for future evaluations. 3 - Restrictions on the complexity of the problem: In the PC version of the program, the maximum number of neutrons is 1000, the maximum number of energy groups is 4, and the maximum number of material compositions is 15. Angular expansion of scattering cross sections is allowed up to P10. These restrictions can easily be removed by increasing input parameters and

  16. Evaluation of carbon-14 life cycle in reactors VVER-1000

    International Nuclear Information System (INIS)

    Lysakova, Katerina; Neumann, Jan; Vonkova, Katerina

    2012-09-01

    This work is aimed at the evaluation of carbon-14 life cycle in light water reactors VVER-1000. Carbon-14 is generated as a side product in different systems of nuclear reactors and has been an issue not only in radioactive waste management but mainly in release into the environment in the form of gaseous effluents. The principal sources of this radionuclide are in primary cooling water and fuel. Considerable amount of C-14 is generated by neutron reactions with oxygen 17 O and nitrogen 14 N present in water coolant and fuel. The reaction likelihood and consequently volume of generated radioisotope depends on several factors, especially on the effective cross-section, concentrations of parent elements and conditions of power plant operating strategies. Due to its long half-life and high capability of integration into the environment and thus into the living species, it is very important to monitor the movement of carbon-14 in all systems of nuclear power plant and to manage its release out of NPP. The dominant forms of radioactive carbon-14 are the hydrocarbons owing to the combinations with hydrogen used for absorption of radiolytic oxygen. These organic compounds, such as formaldehyde, methyl alcohol, ethyl alcohol and formic acid can be mostly retained on ion exchange resins used in the system for purifying primary cooling water. The gaseous carbon compounds (CH 4 and CO 2 ) are released into the atmosphere via the ventilation systems of NPP. Based on the information and data obtained from different sources, it has been designed a balance model of possible carbon-14 pathways throughout the whole NPP. This model includes also mass balance model equations for each important node in system and available sampling points which will be the background for further calculations. This document is specifically not to intended to describe the best monitoring program attributes or technologies but rather to provide evaluation of obtained data and find the optimal way to

  17. Microstructure and embrittlement of VVER 440 reactor pressure vessel steels

    International Nuclear Information System (INIS)

    Hennion, A.

    1999-03-01

    27 VVER 440 pressurised water reactors operate in former Soviet Union and in Eastern Europe. The pressure vessel, is made of Cr-Mo-V steel. It contains a circumferential arc weld in front of the nuclear core. This weld undergoes a high neutron flux and contains large amounts of copper and phosphorus, elements well known for their embrittlement potency under irradiation. The embrittlement kinetic of the steel is accelerated, reducing the lifetime of the reactor. In order to get informations on the microstructure and mechanical properties of these steels, base metals, HAZ, and weld metals have been characterized. The high amount of phosphorus in weld metals promotes the reverse temper embrittlement that occurs during post-weld heat treatment. The radiation damage structure has been identified by small angle neutron scattering, atomic probe, and transmission electron microscopy. Nanometer-sized clusters of solute atoms, rich in copper with almost the same characteristics as in western pressure vessels steels, and an evolution of the size distribution of vanadium carbides, which are present on dislocation structure, are observed. These defects disappear during post-irradiation tempering. As in western steels, the embrittlement is due to both hardening and reduction of interphase cohesion. The radiation damage specificity of VVER steels arises from their high amount of phosphorus and from their significant density of fine vanadium carbides. (author)

  18. Effect of uncompensated SPN detector cables on neutron noise signals measured in VVER-440 reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kiss, S. E-mail: kisss@sunserv.kfki.hu; Lipcsei, S. E-mail: lipcsei@sunserv.kfki.hu; Hazi, G. E-mail: gah@sunserv.kfki.hu

    2003-03-01

    The Self Powered Neutron Detector (SPND) noise measurements of an operating VVER-440 nuclear reactor are described and characterised. Signal characteristics may be radically influenced by the geometrical properties of the detector and the cable, and by the measuring arrangement. Simulator is used as a means of studying the structure of those phase spectra that show propagating perturbations measured on uncompensated SPN detectors. The paper presents measurements with detectors of very different sizes (i.e. 20 cm length SPNDs and the 200 cm length compensation cables), where the ratios of the global and local component differ significantly for the different detector sizes. This phenomenon is used up for signal compensation.

  19. Comparison of radioactive doses after the last protection layer insight the reactor structure for Russian VVER-1000 and German PWR-1300 reactors

    International Nuclear Information System (INIS)

    Rahimi, A.; Mansourshaiflu, N.; Alizadeh, M. R.

    2004-01-01

    In pressurized reactors (VVER and PWR), various protections layers are used for reducing the output core doses. At any protection layer, some amount of neutron and gamma doses is reduced. In this project the axial flux of neutron and gamma beams have been evaluated at various protection layers in the operation state the German PWR-1300 and Russian VVER-1000 reactors by the MCNP computer code. For the purpose of effective use of the MCNP code and assuring its correct performance about of fluxed beams common and series of scientific answers and bench marks should be considered and the results obtained by the MCNP code, be compared with this answers. Then by using appropriate method, for reducing the flux variants of neutron and gamma beams at various protection layers of German PWR-1300 and Russian VVER-1000 reactors of the operation state of both reactors have been accelerated. In this projects, bench marks are computations and numbers existing in PSAR's present at Bushehr nuclear power plant. At the end, by using the results obtained and the standard doses, the time which a person can have work activity at the reactor wall (after the last protection layer), was compared for the operation status of the German PWR-1300 and Russian VVER-1000 reactors

  20. Validation of coupled neutronic / thermal-hydraulic codes for VVER reactors. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mittag, S.; Grundmann, U.; Kliem, S.; Kozmenkov, Y.; Rindelhardt, U.; Rohde, U.; Weiss, F.-P.; Langenbuch, S.; Krzykacz-Hausmann, B.; Schmidt, K.-D.; Vanttola, T.; Haemaelaeinen, A.; Kaloinen, E.; Kereszturi, A.; Hegyi, G.; Panka, I.; Hadek, J.; Strmensky, C.; Darilek, P.; Petkov, P.; Stefanova, S.; Kuchin, A.; Khalimonchuk, V.; Hlbocky, P.; Sico, D.; Danilin, S.; Ionov, V.; Nikonov, S.; Powney, D.

    2004-08-01

    In recent years, the simulation methods for the safety analysis of nuclear power plants have been continuously improved to perform realistic calculations. Therefore in VALCO work package 2 (WP 2), the usual application of coupled neutron-kinetic / thermal-hydraulic codes to VVER has been supplemented by systematic uncertainty and sensitivity analyses. A comprehensive uncertainty analysis has been carried out. The GRS uncertainty and sensitivity method based on the statistical code package SUSA was applied to the two transients studied earlier in SRR-1/95: A load drop of one turbo-generator in Loviisa-1 (VVER-440), and a switch-off of one feed water pump in Balakovo-4 (VVER-1000). The main steps of these analyses and the results obtained by applying different coupled code systems (SMABRE - HEXTRAN, ATHLET - DYN3D, ATHLET - KIKO3D, ATHLET - BIPR-8) are described in this report. The application of this method is only based on variations of input parameter values. No internal code adjustments are needed. An essential result of the analysis using the GRS SUSA methodology is the identification of the input parameters, such as the secondary-circuit pressure, the control-assembly position (as a function of time), and the control-assembly efficiency, that most sensitively affect safety-relevant output parameters, like reactor power, coolant heat-up, and primary pressure. Uncertainty bands for these output parameters have been derived. The variation of potentially uncertain input parameter values as a consequence of uncertain knowledge can activate system actions causing quite different transient evolutions. This gives indications about possible plant conditions that might be reached from the initiating event assuming only small disturbances. In this way, the uncertainty and sensitivity analysis reveals the spectrum of possible transient evolutions. Deviations of SRR-1/95 coupled code calculations from measurements also led to the objective to separate neutron kinetics from

  1. Assessment of computer codes for VVER-440/213-type nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Szabados, L.; Ezsol, Gy.; Perneczky [Atomic Energy Research Institute, Budapest (Hungary)

    1995-09-01

    Nuclear power plant of VVER-440/213 designed by the former USSR have a number of special features. As a consequence of these features the transient behaviour of such a reactor system should be different from the PWR system behaviour. To study the transient behaviour of the Hungarian Paks Nuclear Power Plant of VVER-440/213-type both analytical and experimental activities have been performed. The experimental basis of the research in the PMK-2 integral-type test facility , which is a scaled down model of the plant. Experiments performed on this facility have been used to assess thermal-hydraulic system codes. Four tests were selected for {open_quotes}Standard Problem Exercises{close_quotes} of the International Atomic Energy Agency. Results of the 4th Exercise, of high international interest, are presented in the paper, focusing on the essential findings of the assessment of computer codes.

  2. Delayed Neutron Fraction (beta-effective) Calculation for VVER 440 Reactor

    International Nuclear Information System (INIS)

    Hascik, J.; Michalek, S.; Farkas, G.; Slugen, V.

    2008-01-01

    Effective delayed neutron fraction (β eff ) is the main parameter in reactor dynamics. In the paper, its possible determination methods are summarized and a β eff calculation for a VVER 440 power reactor as well as for training reactor VR1 using stochastic transport Monte Carlo method based code MCNP5 is made. The uncertainties in determination of basic delayed neutron parameters lead to the unwished conservatism in the reactor control system design and operation. Therefore, the exact determination of the β eff value is the main requirement in the field of reactor dynamics. The interest in the delayed neutron data accuracy improvement started to increase at the end of 80-ties and the beginning of 90-ties, after discrepancies among the results of experiments and measurements what do you mean differences between different calculation approaches and experimental results. In consequence of difficulties in β eff experimental measurement, this value in exact state is determined by calculations. Subsequently, its reliability depends on the calculation method and the delayed neutron data used. An accurate estimate of β eff is essential for converting reactivity, as measured in dollars, to an absolute reactivity and/or to an absolute k eff . In the past, k eff has been traditionally calculated by taking the ratio of the adjoint- and spectrum-weighted delayed neutron production rate to the adjoint- and spectrum-weighted total neutron production rate. An alternative method has also been used in which β eff is calculated from simple k-eigenvalue solutions. The summary of the possible β eff determination methods can be found in this work and also a calculation of β eff first for the training reactor VR1 in one operation state and then for VVER 440 power reactor in two different operation states are made using the prompt method, by MCNP5 code.(author)

  3. Neutron dosimetry in EDF experimental surveillance programme for VVER-440 nuclear power plants

    International Nuclear Information System (INIS)

    Brumovsky, M.; Erben, O.; Novosad, P.; Zerola, L.; Hogel, J.; Trollat, C.

    2001-01-01

    Fourteen chains containing experimental surveillance material specimens of the VVER 440/213 nuclear power reactor pressure vessels were irradiated in the surveillance channels of the Nuclear Power Plant Dukovany in the Czech Republic. The irradiation periods were one, two or three cycles. The chains contained different number and types of containers, the omitted ones were replaced by chain elements. All of the containers were instrumented with wire neutron fluence detectors, some of the containers in the chain had spectrometric sets of neutron fluence monitors. For the absolute fluence values evaluation it was taken into account time history of the reactor power and local changes of the neutron flux along the reactor core height, correction factors due to the orientation of monitors with respect to the reactor core centre. Unfolding programs SAND-II or BASA-CF were used. The relative axial fluence distribution was obtained from the O-wire measurements. Neutron fluence values above 0.5 MeV energy and above 1.0 MeV energy in the container axis on the axial positions of the sample centres and fluence values in the geometric centre of the samples was calculated making use the exponential attenuation model of the incident neutron beam. Received fast neutron fluence values can be used as reference values to all VVER-440 type 213 nuclear power plant reactors. (author)

  4. Tightening unit EZ 250 for VVER 1000 type reactor pressure vessel head flange joints

    International Nuclear Information System (INIS)

    Ruchar, Miloslav; Nadenik, Tomas; Kroj, Ludek

    2010-01-01

    The programme of flange joints tightening by seals made of expanded graphite for VVER 440 and VVER 1000 reactor head flange joints is highlighted, and tightening units of row EZ 650 and EZ 650 TK and KNI for VVER 440 reactor head flange joints and EZ 250 tightening unit for VVER 1000 reactor head flange joints are described in detail. The main advantages of electronically controlled tightening units include: Precise and uniform compression of the gasket during the tightening procedure; Automated solution to the graphite relaxing problem during tightening; Possibility of diagnosis of the thread status of the joints being tightened; Alleviation of operator's tough work; Shorter time of tensioning associated with a lower collective doses; Quick preparation of tightening procedure report from the data measured; Calibration renewal is possible in advance at time of unit storage without the need to place it on a real joint. (P.A.)

  5. Natural circulation in a VVER reactor geometry: Experiments with the PACTEL facility and Cathare simulations

    Energy Technology Data Exchange (ETDEWEB)

    Raussi, P.; Kainulainen, S. [Lappeenranta Univ. of Technology, Lappeenranta (Finland); Kouhia, J. [VTT Energy, Lappeenranta (Finland)

    1995-09-01

    There are some 40 reactors based on the VVER design in use. Database available for computer code assessment for VVER reactors is rather limited. Experiments were conducted to study natural circulation behaviour in the PACTEL facility, a medium-scale integral test loop patterned after VVER pressurized water reactors. Flow behaviour over a range of coolant inventories was studied with a small-break experiment. In the small-break experiments, flow stagnation and system repressurization were observed when the water level in the upper plenum fell below the entrances to the hot legs. The cause was attributed to the hot leg loop seals, which are a unique feature of the VVER geometry. At low primary inventories, core cooling was achieved through the boiler-condenser mode. The experiment was simulated using French thermalhydraulic system code CATHARE.

  6. CFD analysis of flow distribution of reactor core and temperature rise of coolant in fuel assembly for VVER reactor

    International Nuclear Information System (INIS)

    Du Daiquan; Zeng Xiaokang; Xiong Wanyu; Yang Xiaoqiang

    2015-01-01

    Flow field of VVER-1000 reactor core was investigated by using computational fluid dynamics code CFX, and the temperature rise of coolant in hot assembly was calculated. The results show that the maximum value of flow distribution factor is 1.12 and the minimum value is 0.92. The average value of flow distribution factor in hot assembly is 0.97. The temperature rise in hot assembly is higher than current warning limit value ΔT t under the deviated operation condition. The results can provide reference for setting ΔT t during the operation of nuclear power plant. (authors)

  7. Component vibration of VVER-reactors - diagnostics and modelling

    International Nuclear Information System (INIS)

    Altstadt, E.; Scheffler, M.; Weiss, F.-P.

    1995-01-01

    Flow induced vibrations of reactor pressure vessel (RPV) internals (control element and core barrel motions) at VVER-440 reactors have led to the development of dedicated methods for on-line monitoring. These methods need a certain developed stage of the faults to be detected. To achieve a real sensitive early detection of mechanical faults of RPV internals, a theoretical vibration model was developed based on finite elements. The model comprises the whole primary circuit including the steam generators (SG). By means of that model all eigenfrequencies up to 30 Hz and the corresponding mode shapes were calculated for the normal vibration behaviour. Moreover the shift of eigenfrequencies and of amplitudes due to the degradation or to the failure of internal clamping and spring elements could be investigated, showing that a recognition of such degradations even inside the RPV is possible by pure excore vibration measurements. A true diagnostic, that is the identification of the failed component, might become possible because different faults influence different and well separated eigenfrequencies. (author)

  8. Comparison of problems and experience of core operation with distorted fuel element assemblies in VVER-1000 and PWR reactors

    International Nuclear Information System (INIS)

    Afanas'ev, A.

    1999-01-01

    The main reactors leading to distortion of fuel element assemblies during reactor operation were studied. A series of actions which compensate this effect was proposed. Criteria of operation limitation in VVER-1000 and PWR reactors are described

  9. Increase in VVER type reactor critical heat fluxes due to placing the mixing grids

    International Nuclear Information System (INIS)

    Bezrukov, Y.; Lisenkov, E.; Vasilchenko, I.

    2011-01-01

    The report deals with the results of studies of critical heat fluxes (CHF) on the models of VVER type reactor fuel assembly models equipped with the 'Vihr' intensifiers-grids. The models are the seven-rod bundles with the uniform and non-uniform axial power that correspond to two periods of FA operation i.e. beginning of cycle and end of cycle. The experiments performed showed that the mixing grids of this type are capable of increasing the FA burnout power. The power ascension rate depends on both coolant pressure and steam quality value in the CHF point. Placing the mixing grids in the bundle upper spans results in shifting the point of DNB occurrence downward along the FA height. The experimental data obtained will be used to develop the correlations for determining the CHF in the FA equipped with the mixing grids. (authors)

  10. Evaluating the consequences of loss of flow accident for a typical VVER-1000 nuclear reactor

    Energy Technology Data Exchange (ETDEWEB)

    Mirvakili, S.M.; Safaei, S. [Shiraz Univ., Shiraz (Iran, Islamic Republic of). Dept. of Nuclear Engineering, School of Mechanical Engineering; Faghihi, F. [Shiraz Univ., Shiraz (Iran, Islamic Republic of). Safety Research Center

    2010-07-01

    The loss of coolant flow in a nuclear reactor can result from a mechanical or electrical failure of the coolant pump. If the reactor is not tripped promptly, the immediate effect is a rapid increase in coolant temperature, decrease in minimum departure from nucleate boiling ratio (DNBR) and fuel damage. This study evaluated the shaft seizure of a reactor coolant pump in a VVER-1000 nuclear reactor. The locked rotor results in rapid reduction of flow through the affected reactor coolant loop and in turn leads to an increase in the primary coolant temperature and pressure. The analysis was conducted with regard for superimposing loss of power to the power plant at the initial accident moment. The required transient functions of flow, pressure and power were obtained using system transient calculations applied in COBRA-EN computer code in order to calculate the overall core thermal-hydraulic parameters such as temperature, critical heat flux and DNBR. The study showed that the critical period for the locked rotor accident is the first few seconds during which the maximum values of pressure and temperature are reached. 10 refs., 1 tab., 3 figs.

  11. Modelling and analysis of severe accidents for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Tusheva, Polina

    2012-01-01

    Accident conditions involving significant core degradation are termed severe accidents /IAEA: NS-G-2.15/. Despite the low probability of occurrence of such events, the investigation of severe accident scenarios is an important part of the nuclear safety research. Considering a hypothetical core melt down scenario in a VVER-1000 light water reactor, the early in-vessel phase focusing on the thermal-hydraulic phenomena, and the late in-vessel phase focusing on the melt relocation into the reactor pressure vessel (RPV) lower head, are investigated. The objective of this work is the assessment of severe accident management procedures for VVER-1000 reactors, i.e. the estimation of the maximum period of time available for taking appropriate measures and particular decisions by the plant personnel. During high pressure severe accident sequences it is of prime importance to depressurize the primary circuit in order to allow for effective injection from the emergency core cooling systems and to avoid reactor pressure vessel failure at high pressure that could cause direct containment heating and subsequent challenge to the containment structure. Therefore different accident management measures were investigated for the in-vessel phase of a hypothetical station blackout accident using the severe accident code ASTEC, the mechanistic code ATHLET and the multi-purpose code system ANSYS. The analyses performed on the PHEBUS ISP-46 experiment, as well as simulations of small break loss of coolant accident and station blackout scenarios were used to contribute to the validation and improvement of the integral severe accident code ASTEC. Investigations on the applicability and the effectiveness of accident management procedures in the preventive domain, as well as detailed analyses on the thermal-hydraulic phenomena during the early in-vessel phase of a station blackout accident have been performed with the mechanistic code ATHLET. The results of the simulations show, that the

  12. The virtual digital nuclear power plant: A modern tool for supporting the lifecycle of VVER-based nuclear power units

    Science.gov (United States)

    Arkadov, G. V.; Zhukavin, A. P.; Kroshilin, A. E.; Parshikov, I. A.; Solov'ev, S. L.; Shishov, A. V.

    2014-10-01

    The article describes the "Virtual Digital VVER-Based Nuclear Power Plant" computerized system comprising a totality of verified initial data (sets of input data for a model intended for describing the behavior of nuclear power plant (NPP) systems in design and emergency modes of their operation) and a unified system of new-generation computation codes intended for carrying out coordinated computation of the variety of physical processes in the reactor core and NPP equipment. Experiments with the demonstration version of the "Virtual Digital VVER-Based NPP" computerized system has shown that it is in principle possible to set up a unified system of computation codes in a common software environment for carrying out interconnected calculations of various physical phenomena at NPPs constructed according to the standard AES-2006 project. With the full-scale version of the "Virtual Digital VVER-Based NPP" computerized system put in operation, the concerned engineering, design, construction, and operating organizations will have access to all necessary information relating to the NPP power unit project throughout its entire lifecycle. The domestically developed commercial-grade software product set to operate as an independently operating application to the project will bring about additional competitive advantages in the modern market of nuclear power technologies.

  13. Investigation on accident management measures for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Tusheva, P.; Schaefer, F.; Rohde, U.; Reinke, N.

    2009-01-01

    A consequence of a total loss of AC power supply (station blackout) leading to unavailability of major active safety systems which could not perform their safety functions is that the safety criteria ensuring a secure operation of the nuclear power plant would be violated and a consequent core heat-up with possible core degradation would occur. Currently, a study which examines the thermal-hydraulic behaviour of the plant during the early phase of the scenario is being performed. This paper focuses on the possibilities for delay or mitigation of the accident sequence to progress into a severe one by applying Accident Management Measures (AMM). The strategy 'Primary circuit depressurization' as a basic strategy, which is realized in the management of severe accidents is being investigated. By reducing the load over the vessel under severe accident conditions, prerequisites for maintaining the integrity of the primary circuit are being created. The time-margins for operators' intervention as key issues are being also assessed. The task is accomplished by applying the GRS thermal-hydraulic system code ATHLET. In addition, a comparative analysis of the accident progression for a station blackout event for both a reference German PWR and a reference VVER-1000, taking into account the plant specifics, is being performed. (authors)

  14. A successful approach for the implementation of symptom-based emergency operating procedures for VVER reactors

    International Nuclear Information System (INIS)

    Lhoest, V.; Prior, R.; Pascal, G.

    2000-01-01

    The paper provides an overview of the organization, the progress and the results of the various Emergence Operating Procedure (EOP) development programs for VVER type reactors conducted by Westinghouse so far. The detailed working process is presented through the solutions to some major plant issues. The EOPs have been developed for the Temelin, Dukovany, Bohunice, Mochovce and Paks VVER nuclear power plants. The procedures are developed in working teams of experts from the utility and Westinghouse. The completion of the programs constitute an indication of the overall success of this approach. This is further reinforced by the general acceptance of the new procedures by the plant personnel, together with the good results obtained so far from procedure testing. This is also confirmed by a new PSA-level 1 analysis for Dukovany plant, which shows a significant improvement in the overall plant safety. This means a 20% reduction in the Core Damage Frequency due to the introduction of the new EOPs. The fact that some modifications have been implemented to the plants to solve design weaknesses identified in the course of this programs also constitute a positive result

  15. BN-1200 Reactor Power Unit Design Development

    International Nuclear Information System (INIS)

    Vasilyev, B.A.; Shepelev, S.F.; Ashirmetov, M.R.; Poplavsky, V.M.

    2013-01-01

    Main goals of BN-1200 design: • Develop a reliable new generation reactor plant for the commercial power unit with fast reactor to implement the first-priority objectives in changing over to closed nuclear fuel cycle; • Improve technical and economic indices of BN reactor power unit to the level of those of Russian VVER of equal power; • Enhance the safety up to the level of the requirements for the 4th generation RP

  16. Thermal-hydraulic studies on the safety of VVER-440 type nuclear power plants

    International Nuclear Information System (INIS)

    Tuunanen, J.

    1994-01-01

    The thesis includes several thermal-hydraulic analyses related to the Loviisa VVER-440 nuclear power plant units. The work consists of experimental studies, analysis of the experiments, analysis of some plant transients and development of a calculational model for calculation of boric concentrations in the reactor. In the first part of thesis, in the case of simulation of boric acid solution behaviour during long-term cooling period of LOCAs, experiments were performed in scaled-down test facilities. The experimental data together with the results of RELAP5/MOD3 simulations were used to develop a model for calculations of boric acid concentrations in the reactor during LOCAs. In the second part, in the case of simulation of horizontal generators, experiments were performed with PACTEL integral test loop to simulate loss of feedwater transients. The PACTEL experiments as well as earlier REWETT-III natural circulation tests, were analyzed with RELAP5/MOD3 Version 5m5 code. The third part of the work consists of simulations of Loviisa VVER reactor pump trip transients with RELAP5/MOD1-Eur, RELAP5/MOD3 and CATHARE codes. (56 refs., 9 figs.)

  17. Numerical investigation of the coolant mixing during fast deboration transients for VVER-440 type reactors

    International Nuclear Information System (INIS)

    Hoehne, T.; Rhode, U.

    2000-01-01

    The VVER-440 (440 MW) V-230 was considered for analyzing the flow field and mixing processes. The V-230 has no elliptical sieve plate in the lower plenum. Previously, the 3D flow distribution in the downcomer and the lower plenum of the VVER-440 reactor have been calculated by means of the CFD code CFX-4 for operational conditions. The CFX-calculations were compared with the experimental data and the analytical mixing model. In this paper, CFD calculations for the start-up of the first main coolant pump in a VVER-440 type reactor are reported about. This scenario is important in case that there is a plug of lower borated water in one of the primary coolant loops. (orig.)

  18. The status of the Bubbler Condenser Containment System for the Reactors of the VVER-440/213 Type

    International Nuclear Information System (INIS)

    Karwat, H.; Rosinger, H.E.

    1998-01-01

    VVER-440/213 Pressurized Water Reactors have a pressure-suppression containment structure called a 'Bubbler Condenser' tower which can reduce the design pressure of the entire containment following a design basis accident (DBA), such as a loss-of-coolant accident (LOCA). The bubbler condenser pressure suppression system provides reduction of the LOCA containment pressure by the condensation of released steam in a water pool. World-wide there are 14 nuclear power plants of the VVER-440/213 type in Eastern Europe and Russia. One of the safety concerns for the VVER-440/213 reactors relates to the ability of the bubbler condenser containment system to function satisfactorily and to maintain its integrity following certain postulated accidents and thus limit the release of radioactive material to the environment. The complicated geometry of the bubbler condenser unit, and the dependence on several moving devices and interlocks are the main doubts expressed by different specialists with regard to the design. General description of the bubbler condenser containment system, the physical processes, concerns and design assessment of the bubbler condenser containment system, presentation of the OECD's Unified Bubbler Condenser Research Project (UBCRP) and the European Commission PHARE/TACIS project. Recent utility investigations are also discussed

  19. NNSA / IAEA VVER reactor safety workshops. May 2002 - April 2003. Executive summary

    International Nuclear Information System (INIS)

    Evans, M.; Petri, M. C.

    2003-01-01

    Over the past year, the U.S. National Nuclear Security Administration (NNSA) has sponsored four workshops to compare the probabilistic risk assessments (PRAs) of Soviet-designed VVER power plants. The ''International Workshop on Safety of First-Generation VVER-440 Nuclear Power Plants'' was held on May 20-25, 2002, in Piestany, Slovakia. A short follow-on workshop was held in Bratislava, Slovakia, on November 5-6, 2002, to complete the work begun in May. Piestany was the location also for the ''International Workshop on Safety of Second-Generation VVER-440 Nuclear Power Plants'' (September 9-14, 2002) and the ''International Workshop on Safety of VVER-1000 Nuclear Power Plants'' (April 7-12, 2003). The four workshops were held in cooperation with the International Atomic Energy Agency (IAEA), the Nuclear Regulatory Authority of Slovakia (UJD), the Center for Nuclear Safety in Central and Eastern Europe (CENS), and Argonne National Laboratory (ANL). The objectives of the workshops were to identify the impact of the improvements on the core damage frequency; the contribution to the PRA results of different assumptions about events that can occur at the plants; and to understand, identify, and prioritize potential improvements in hardware and plant operation of VVER nuclear power plants. These objectives were achieved based on insights gained from recent PRAs completed by the plants and their technical support organizations. Nine first-generation VVER-440 plants (nominally of the VVER-440/230 design) are currently operating in Armenia, Bulgaria, Russia, and Slovakia. Sixteen VVER-440/213 plants are currently operating in the Czech Republic, Hungary, Russia, Slovakia, and Ukraine. Twenty-three VVER-1000 plants are currently operating in Bulgaria, the Czech Republic, Russia, and Ukraine. Eleven addition plants are in the advanced stages of construction in various parts of the world. The workshops reviewed the current configuration and safety status of each plant

  20. Coupled neutronic core and subchannel analysis of nanofluids in VVER-1000 type reactor

    Energy Technology Data Exchange (ETDEWEB)

    Zarifi, Ehsan; Sepanloo, Kamran [Nuclear Science and Technology Research Institute (NSTRI), Tehran (Iran, Islamic Republic of). Reactor and Nuclear Safety School; Jahanfarnia, Golamreza [Islamic Azad Univ., Tehran (Iran, Islamic Republic of). Dept. of Nuclear Engineering, Science and Research Branch

    2017-05-15

    This study is aimed to perform the coupled thermal-hydraulic/neutronic analysis of nanofluids as the coolant in the hot fuel assembly of VVER-1000 reactor core. Water-based nanofluid containing various volume fractions of Al{sub 2}O{sub 3} nanoparticle is analyzed. WIMS and CITATION codes are used for neutronic simulation of the reactor core, calculating neutron flux and thermal power distribution. In the thermal-hydraulic modeling, the porous media approach is used to analyze the thermal behavior of the reactor core and the subchannel analysis is used to calculate the hottest fuel assembly thermal-hydraulic parameters. The derived conservation equations for coolant and conduction heat transfer equation for fuel and clad are discretized by Finite volume method and solved numerically using visual FORTRAN program. Finally the analysis results for nanofluids and pure water are compared together. The achieved results show that at low concentration (0.1 percent volume fraction) alumina is the optimum nanoparticles for normal reactor operation.

  1. The effect of boron dilution transient on the VVER-1000 reactor core using MCNP and COBRA-EN codes

    Energy Technology Data Exchange (ETDEWEB)

    Jafari, Naser; Talebi, Saeed [Amirkabir Univ. of Technology, Tehran Polytechnic (Iran, Islamic Republic of). Dept. of Energy Engineering and Physics

    2017-07-15

    In this paper, the effect of boron dilution transient, as a consequence of the malfunction of the boron control system, was investigated in a VVER-1000 reactor, and then an appropriate setpoint was determined for the actuation of the emergency protection system to the reactor shutdown. In order to simulate the boron dilution, first, the whole reactor core was simulated by MCNPX code to compute the radial and axial power distribution. Then, the COBRA-EN code was employed using calculated power distribution for analyzing the thermal-hydraulic of hot fuel assembly and for extracting the safety parameters. For the safe operation of the reactor, certain parameters must be in defined specified ranges. Comparison between our results and FSARs data shows that the present modeling provides a good prediction of boron dilution transient with the maximum relative difference about 4%.

  2. Structural mechanisms of the flux effect for VVER-1000 reactor pressure vessel materials

    International Nuclear Information System (INIS)

    Gurovich, B.; Kuleshova, E.; Fedotova, S.; Maltsev, D.; Zabusov, O.; Frolov, A.; Erak, D.; Zhurko, D.

    2015-01-01

    To justify the lifetime extension of VVER-1000 reactor pressure vessels (RPV) up to 60 years and more it is necessary to expand the existing surveillance samples database to beyond design fluence by means of accelerated irradiation in a research reactor. Herewith since the changes in mechanical properties of materials under irradiation are due to occurring structural changes, correct analysis of the data obtained at accelerated irradiation of VVER-1000 RPV materials requires a clear understanding of the structural mechanisms that are responsible for the flux effect in VVER-1000 RPV steels. Two mechanisms are responsible for radiation embrittlement of VVER-1000 RPV steels: the hardening one (radiation hardening due to formation of radiation-induced Ni-based precipitates and radiation defects) and non-hardening one (due to formation of impurities segregations at grain boundaries - reversible temper brittleness). In this context for an adequate interpretation of the mechanical tests results when justifying the lifetime extension of existing units a complex of comparative structural studies (TEM, SEM and AES) of VVER-1000 RPV materials irradiated in different conditions (in research reactor IR-8 and within surveillance samples) was performed. It is shown that the flux effect is observed for materials with high nickel content (weld metals with Ni content > 1.35%) and it is mostly due to the contribution of non-hardening mechanism of radiation embrittlement (the difference in the accumulation kinetics of grain boundary phosphorus segregation) and somewhat contribution of the hardening mechanism (the difference in density of radiation-induced precipitates). Therefore when analyzing the results obtained from the accelerated irradiation of VVER-1000 WM the correction for the flux effect should be made. (authors)

  3. The review of the reactor physics experiments carried out on the LR-0 research reactor NRI Rez plc for reactors of the VVER type

    International Nuclear Information System (INIS)

    Hudec, Frantisek; Jansky, Bohumil; Juricek, Vlastimil; Mikus, Jan; Novak, Evzen; Osmera, Bohumil; Posta, Severin; Rypar, Vojtech; Svadlenkova, Marie

    2010-01-01

    LR-0 is an experimental zero power reactor mainly used for the determination of the neutron-physical characteristics of WWER and PWR type reactor lattices and shielding with UO2 or MOX fuel. Its major assets include capability to design and operate multizone cores, i.e. substituted cores, with an inner inserted part in hexagonal or square geometry (driven by LR-0 standard assemblies); Standard and special supporting plates for mock-up experiments; special supporting plates, which enables the triangular symmetrical assembly arrangement with an arbitrary pitch; Modeling neutron field parameters of power reactors; Wide range benchmarking possibilities, with high reproducibility of the benchmark design parameters; Wide range of measurement techniques including equipment and experienced personal; Flexible rearrangements of the core. The main experiments included: Pin wise flux distribution measurements; VVER-440 and VVER-1000 mock-ups; compact spent fuel storage; space kinetics experiment; core parameters experimental determination; experiment with new design fuel assembly; WWER-440 control assembly influence; and burnable absorber study. International research projects are also described. (P.A.)

  4. Accident analysis for new reactor concepts and VVER type reactor design with advanced fuel. STC with Russia. Final report

    International Nuclear Information System (INIS)

    Grundmann, U.; Kliem, S.; Mittag, S.; Rohde, U.; Seidel, A.

    2000-10-01

    In the frame of a project on scientific-technical cooperation funded by BMBF/BMWi, the 3D reactor dynamics code DYN3D developed at Forschungszentrum Rossendorf (FZR), has been transferred to the Institute of Physics and Power Engineering (IPPE) Obninsk in Russia and integrated into the software package of IPPE. DYN3D has been coupled to a thermohydraulic system code used in IPPE making available 3D neutron kinetics within this software package. A new macroscopic cross section library has been created using a modified version of the WIMS/D4 code. This library includes data for modernized fuel design containing burnable absorbers in different concentrations, which is tested in VVER-1000 type reactors. The cross section library has been connected to DYN3D. Calculations were performed to check the library in comparison with other data libraries and codes. The code DYN3D and the coupled 3D neutron kinetics/thermal hydraulics code system were used to perform analyses of Anticipated Transients Without Scram (ATWS) for the reactor design ABV-67, an integral reactor concept with small power developed under participation of IPPE. The fluid dynamics code DINCOR developed at IPPE was transferred to FZR. It was used in validation calculations on test problems for the short-term core melt behaviour (CORVIS experiments). (orig.) [de

  5. Calculation of the source term for a S1B-sequence at a VVER-1000 type reactor. Part 1

    International Nuclear Information System (INIS)

    Sdouz, G.

    1990-10-01

    The behaviour of the source term in a VVER-1000 type reactor is calculated using the 'Source Term Code Package' (STCP). The input data are based on the russian plant Zaporozhye-5. The selected accident sequence is a small break LOCA in the hot leg followed by loss offsite and onsite electric power (S 1 B-sequence). According to the course of the calculation the results are presented and analyzed for each program. Except for the noble gases all release fractions are lower than 10 -4 . 18 refs., 10 tabs. (Author)

  6. Insights from the U.S. department of Energy plant safety evaluation program of VVER and RBMK reactors

    International Nuclear Information System (INIS)

    Petri, M.C.; Binder, J.L.; Pasedag, W.F.

    2001-01-01

    Throughout the years 1990 the U.S. Department of Energy has worked build capability in countries of the former Soviet Union to assess the safety of their VVER and RBMK reactors. Through this Plant Safety Evaluation Program, deterministic and probabilistic analyses have been used to provide a documented plant risk profile to support safe plant operation and to set priorities for safety upgrades. Work has been sponsored at thirteen nuclear power plant sites in eight countries. The Plant Safety Evaluation Program has resulted in immediate and long-term safety benefits for the Soviet-designed nuclear plants. (author)

  7. A new optimization method based on cellular automata for VVER-1000 nuclear reactor loading pattern

    International Nuclear Information System (INIS)

    Fadaei, Amir Hosein; Setayeshi, Saeed

    2009-01-01

    This paper presents a new and innovative optimization technique, which uses cellular automata for solving multi-objective optimization problems. Due to its ability in simulating the local information while taking neighboring effects into account, the cellular automata technique is a powerful tool for optimization. The fuel-loading pattern in nuclear reactor cores is a major optimization problem. Due to the immensity of the search space in fuel management optimization problems, finding the optimum solution requires a huge amount of calculations in the classical method. The cellular automata models, based on local information, can reduce the computations significantly. In this study, reducing the power peaking factor, while increasing the initial excess reactivity inside the reactor core of VVER-1000, which are two apparently contradictory objectives, are considered as the objective functions. The result is an optimum configuration, which is in agreement with the pattern proposed by the designer. In order to gain confidence in the reliability of this method, the aforementioned problem was also solved using neural network and simulated annealing, and the results and procedures were compared.

  8. Erosion-corrosion entrainment of iron-containing compounds as a source of deposits in steam generators used at nuclear power plants equipped with VVER reactors

    Science.gov (United States)

    Tomarov, G. V.; Shipkov, A. A.

    2011-03-01

    The main stages and processes through which deposits are generated, migrate, and precipitate in the metal-secondary coolant system of power units at nuclear power plants are analyzed and determined. It is shown that substances produced by the mechanism of general erosion-corrosion are the main source of the ionic-colloid form of iron, which is the main component of deposits in a steam generator. Ways for controlling the formation of deposits in a nuclear power plant's steam generator are proposed together with methods for estimating their efficiency.

  9. Application of the Defense-in-Depth Concept in the Projects of New-Generation NPPs Equipped with VVER Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Shvyryaev, Yu. V.; Morozov, V. B.; Kuchumov, A.Yu., E-mail: morozov@aep.ru [JSC Atomenergoproekt, Moscow (Russian Federation)

    2014-10-15

    The projects of new-generation NPPs equipped with VVER reactors are developed as projects the safety level of which is superior to that of NPPs that are currently in operation. The main design solutions adopted for implementing the defence-in-depth (DiD) concept in the projects of new-generation NPPs equipped with VVER reactors are briefly characterized in the paper. (author)

  10. Safety regulations regarding to accident monitoring and accident sampling at Russian NPPs with VVER type reactors

    International Nuclear Information System (INIS)

    Sharafutdinov, Rachet; Lankin, Michail; Kharitonova, Nataliya

    2014-01-01

    The paper describes a tendency by development of regulatory document requirements related to accident monitoring and accident sampling at Russia's NPPs. Lessons learned from the Fukushima Daiichi accident pointed at the importance and necessary to carry out an additional safety check at Russia's nuclear power plants in the preparedness for management of severe accidents at NPPs. Planned measures for improvement of severe accidents management include development and implementation of the accident instrumentation systems, providing, monitoring, management and storage of information in a severe accident conditions. The draft of Safety Guidelines <power plants with VVER reactors' prepared by Scientific and Engineering Centre for Nuclear and Radiation Safety (SEC NRS) established the main criteria for accident monitoring instrumentation that can monitor relevant plant parameters in the reactor and inside containment during and after a severe accident in nuclear power plants. Development of these safety guidelines is in line with the recommendations of IAEA Action Plan on Nuclear Safety in response to the Fukushima Daiichi event and recommendations of the IAEA Nuclear Energy series Report <Power Plants' (Draft V 2.7). The paper presents the principles, which are used as the basis for selection of plant parameters for accident monitoring and for establishing of accident monitoring instrumentation. The recommendations to the accident sampling system capable to obtain the representative reactor coolant and containment air and fluid samples that support accurate analytical results for the parameters of interest are considered. The radiological and chemistry parameters to be monitored for primary coolant and sump and for containment air are specified. (author)

  11. Simulation of VVER MCCI reactor test case with ASTEC V2/MEDICIS computer code

    International Nuclear Information System (INIS)

    Stefanova, A.; Grudev, P.; Gencheva, R.

    2011-01-01

    This paper presents an application of the ASTEC v2, module MEDICIS for simulation of VVER Molten core concrete interaction test (MCCI) case without water injection. The main purpose of performed calculation is verification and improvement of module MEDICIS/ASTECv2 for better simulation of core concrete interaction processes. The VVER-1000 reference nuclear power plant was chosen as SARNET2 benchmark MCCI test-case. The initial conditions for MCCI test are taken after SBO scenario calculated with ASTEC version 1.3R2 by INRNE. (authors)

  12. Possibility of implementation of 6-year fuel cycle at NPP with VVER-440 reactor

    Energy Technology Data Exchange (ETDEWEB)

    Heraltova, L., E-mail: lenka.heraltova@fjfi.cvut.cz [UJV Rez a.s., Hlavni 130, 250 68 Husinec-Rez (Czech Republic); Faculty of Nuclear Sciences and Physical Engineering, Czech Technical University in Prague, Brehova 7, 115 19 Praha 1 (Czech Republic)

    2015-12-15

    Highlights: • Possibility of extension of fuel cycle. • Increase of enrichment above 5% {sup 235}U. • Core properties calculated by diffusion code ANDREA. • Back end fuel cycle characteristic. - Abstract: This paper discusses possibility of an extension of a fuel cycle at a VVER-440 reactor for up to 6 years. The prolongation of a fuel cycle was realized by optimization of a fuel design and increasing of a fuel enrichment. The modified design of the fuel assembly covers change of pellet geometry, decreasing of parasitic absorption in construction materials, improved moderation of fuel pins and also increase of enrichment. Fuel assemblies with enrichment up to 7% {sup 235}U are considered for prolonged fuel batches. Three different batch lengths were considered for evaluation of core properties – 12, 18 and 24 months, and two types of burnable absorbers were included – Gd{sub 2}O{sub 3} and Er{sub 2}O{sub 3}. Comparison of proposed fuel assemblies was realized by length of a batch, average burnup, maximal power of fuel assembly or fuel pin, control fuel assembly worth, reactivity coefficients, and effective delayed neutrons fraction. Comparison of characteristics of a burned fuel discharged from a reactor core is discussed in the last part of the paper.

  13. Safety related investigations of the VVER-1000 reactor type by the coupled code system TRACE/PARCS

    International Nuclear Information System (INIS)

    Jaeger, Wadim; Lischke, Wolfgang; Sanchez Espinoza, Victor Hugo

    2007-01-01

    This study was performed at the Institute of Reactor Safety at the Research Center Karlsruhe. It is embedded in the ongoing investigations of the international code application and maintenance program (CAMP) for qualification and validation of system codes like TRACE [1] and PARCS [2]. The predestinated reactor type for the validation of these two codes was the Russian designed VVER-1000 because the OECD/NEA VVER-1000 Coolant Transient Benchmark Phase 2 [3] includes detailed information of the Bulgarian nuclear power plant (NPP) Kozloduy unit 6. The posttest-investigations of a coolant mixing experiment have shown that the predicted parameters (coolant temperature, pressure drop, etc.) are in good agreement to the measured data. The coolant mixing pattern especially in the downcomer has been also reproduced quiet well by TRACE. The coupled code system TRACE/PARCS which was applied on a postulated main steam line break (MSLB) provides good results compared to reference values and the ones of other participants of the benchmark. It can be pointed out that the developed three-dimensional nodalisation of the reactor pressure vessel (RPV) is appropriate for the description of transients where the thermal-hydraulics and the neutronics are strongly linked. (author)

  14. Isothermal and thermal–mechanical fatigue of VVER-440 reactor pressure vessel steels

    Energy Technology Data Exchange (ETDEWEB)

    Fekete, Balazs, E-mail: fekete.mm.bme@gmail.com [College of Dunaujvaros, Tancsics 1A, Dunaujvaros H-2400 (Hungary); Department of Applied Mechanics, Budapest University of Technology and Economics, Muegyetem 5, Budapest H-1111 (Hungary); Trampus, Peter [College of Dunaujvaros, Tancsics 1A, Dunaujvaros H-2400 (Hungary)

    2015-09-15

    Highlights: • We aimed to determine the thermomechanical behaviour of VVER reactor steels. • Material tests were developed and performed on GLEEBLE 3800 physical simulator. • Coffin–Manson curves and parameters were derived. • High accuracy of the strain energy based evaluation was found. • The observed dislocation evolution correlates with the mechanical behaviour. - Abstract: The fatigue life of the structural materials 15Ch2MFA (CrMoV-alloyed ferritic steel) and 08Ch18N10T (CrNi-alloyed austenitic steel) of VVER-440 reactor pressure vessel under completely reserved total strain controlled low cycle fatigue tests were investigated. An advanced test facility was developed for GLEEBLE-3800 physical simulator which was able to perform thermomechanical fatigue experiments under in-service conditions of VVER nuclear reactors. The low cycle fatigue results were evaluated with the plastic strain based Coffin–Manson law, and plastic strain energy based model as well. It was shown that both methods are able to predict the fatigue life of reactor pressure vessel steels accurately. Interrupted fatigue tests were also carried out to investigate the kinetic of the fatigue evolution of the materials. On these samples microstructural evaluation by TEM was performed. The investigated low cycle fatigue behavior can provide reference for remaining life assessment and lifetime extension analysis.

  15. FP 6 EU - COVERS. Coordination action - VVER safety research

    International Nuclear Information System (INIS)

    Vasa, I.

    2008-01-01

    In this work research program of the European Union FP 6 - COVERS coordinated by the NRI Rez is presented. COVERS is designed to improve professional and communication environment in the specific area covering all aspects of safe and reliable operation of nuclear power plants with VVER-440 and VVER-1000 reactors. Project Consortium is composed of 26 research and development, engineering and technical support organisations of European VVER-operating and other EU and non-EU countries.

  16. Influence of geometrical parameters of the VVER-1000 reactor construction elements to internals irradiation conditions

    Directory of Open Access Journals (Sweden)

    О. M. Pugach

    2015-07-01

    Full Text Available Investigations to determine the influences of geometrical parameters of the calculational VVER-1000 reactor model to the results of internal irradiation condition determination are carried out. It is shown that the values of appropriate sensitivity matrix elements are not dependent on a height coordinate for any core level, but there is their azimuthal dependence. Maximum possible relative biases of neutron fluence due to inexact knowledge of internal geometrical parameters are obtained for the baffle and the barrel.

  17. Model of nuclear reactor type VVER-1000/V-320 built by computer code ATHLET-CD

    International Nuclear Information System (INIS)

    Georgiev, Yoto; Filipov, Kalin; Velev, Vladimir

    2014-01-01

    A model of nuclear reactor type VVER-1000 V-320 developed for computer code ATHLET-CD2.1A is presented. Validation of the has been made, in the analysis of the station blackout scenario with LOCA on fourth cold leg is shown. As the calculation has been completed, the results are checked through comparison with the results from the computer codes ATHLET-2.1A, ASTEC-2.1 and RELAP5mod3.2

  18. Regulatory use the classification security systems of I and C in VVER type reactors

    International Nuclear Information System (INIS)

    Ilizastegui Perez, F.

    1998-01-01

    Presently work the author proposes a classification to the system I and C to the VVER 440 type reactor in categories the regulatory control with a view to establishing the degree to the attention that the regulator should pay to these systems, leaving the importance that have the same ones for the security the installation, during the execution the works that are carried out with this equipment in the stages construction, setting in service and exploitation

  19. Ukrainian Nuclear Society International Conference 'Modernization of the NPP with VVER reactor' (abstracts)

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.

    1999-01-01

    Abstracts of the papers presented at International conference of the Ukrainian Nuclear Society 'Modernization of the NPP with VVER reactor'. The following problems are considered: improving the NPP's safety and reliability; reactor modernization, the lifetime prolongation; increasing of the reactor operating characteristics; methods of capacity factor increasing: refueling control, maintenance control; technical and economical aspects of NPP modernization; modernization of the automated control system of the fuel process at the NPP's; technical features and methods for the continued radiation and technology control at the NPP's; training, increasing the staff qualification and NPP modernization

  20. Transient thermal-hydraulic/neutronic analysis in a VVER-1000 reactor core

    International Nuclear Information System (INIS)

    Seyed khalil Mousavian; Mohammad Mohsen Ertejaei; Majid Shahabfar

    2005-01-01

    Full text of publication follows: Nowadays, coupled thermal-hydraulic and three-dimensional neutronic codes in order to consider different feedback effects is state of the art subject in nuclear engineering researches. In this study, RELAP5/COBRA and WIMS/CITATION codes are implemented to investigate the VVER-1000 reactor core parameters during Large Break Loss of Coolant Accident (LB-LOCA). In a LB-LOCA, the primary side pressure, coolant density and fuel temperature strongly decrease but the cladding temperature experiences a strong peak. For this purpose, the RELAP5 Best Estimate (BE) system code is used to simulate the LB-LOCA analysis in VVER-1000 nuclear thermal-hydraulic loops. Also, the modified COBRA-IIIc software as a sub-channel analysis code is applied for modeling of VVER-1000 reactor core. Moreover, WIMS and CITATION as a cross section and 3-D neutron flux codes are coupled with thermal-hydraulic codes with the aim of consider the spatial effects through the reactor core. For this reason, suitable software is developed to link and speed up the coupled thermalhydraulic and three-dimensional neutronic calculations. This software utilizes of external coupling concept in order to integrate thermal-hydraulic and neutronic calculations. (authors)

  1. SCORPIO-VVER core monitoring and surveillance system with advanced capabilities

    International Nuclear Information System (INIS)

    Molnar, J.; Vocka, R.

    2010-01-01

    In this work authors present 12 years of operation experience of core monitoring and surveillance system with advanced capabilities on nuclear power plants on 6 unit of VVER-440 type of reactors at two different NPPs. The original version of the SCORPIO (Surveillance of reactor CORe by PIcture On-line display) system was developed for the western type of PWR reactors. The first version of the SCORPIO-VVER Core Monitoring System for Dukovany NPP (VVER-440 type of reactor, Czech Republic) was developed in 1998. For SCORPIO-VVER implementation at Bohunice NPP in Slovakia (2001) the system was enhanced with startup module KRITEX.

  2. The role of PRA in the safety assessment of VVER Nuclear Power Plants in Ukraine

    International Nuclear Information System (INIS)

    Kot, C.

    1999-01-01

    Ukraine operates thirteen (13) Soviet-designed pressurized water reactors, VVERS. All Ukrainian plants are currently operating with annually renewable permits until they update their safety analysis reports (SARs), in accordance with new SAR content requirements issued in September 1995, by the Nuclear Regulatory Authority and the Government Nuclear Power Coordinating Committee of Ukraine. The requirements are in three major areas: design basis accident (DBA) analysis, probabilistic risk assessment (PRA), and beyond design-basis accident (BDBA) analysis. The last two requirements, on PRA and BDBA, are new, and the DBA requirements are an expanded version of the older SAR requirements. The US Department of Energy (USDOE), as part of its Soviet-Designed Reactor Safety activities, is providing assistance and technology transfer to Ukraine to support their nuclear power plants (NPPs) in developing a Western-type technical basis for the new SARs. USDOE sponsored In-Depth Safety Assessments (ISAs) are in progress at three pilot nuclear reactor units in Ukraine, South Ukraine Unit 1, Zaporizhzhya Unit 5, and Rivne Unit 1, and a follow-on study has been initiated at Khmenytskyy Unit 1. The ISA projects encompass most areas of plant safety evaluation, but the initial emphasis is on performing a detailed, plant-specific Level 1 Internal Events PRA. This allows the early definition of the plant risk profile, the identification of risk significant accident sequences and plant vulnerabilities and provides guidance for the remainder of the safety assessments

  3. Reloading pattern optimization of VVER-1000 reactors in transient cycles using genetic algorithm

    International Nuclear Information System (INIS)

    Rahmani, Yashar

    2017-01-01

    Highlights: • The genetic algorithm (GA) and the innovative weighting factors method were used. • The coupling of WIMSD5-B and CITATION-LDI2 neutronic codes with the thermohydraulic WERL code was employed. • Optimization of reloading patterns was carried out in two states. • First an arrangement with satisfactory excess reactivity and the flattest power distribution was searched. • Second, it is tried to obtain an arrangement with satisfactory safety threshold and the maximum K_e_f_f. - Abstract: The present paper proposes application of the genetic algorithm (GA) and the innovative weighting factor method to optimize the reloading pattern of Bushehr VVER-1000 reactor in the second cycle. To estimate the composition of fuel assemblies remaining from the first cycle and precisely calculate the objective parameters of each reloading pattern in the second cycle, coupling of WIMSD5-B and CITATION-LDI2 codes in the neutronic section and the WERL code in the thermo-hydraulic section was employed. Optimization of the reloading patterns was carried out in two states. To meet the mentioned objective, with application of the weighting factor method in the first state, the type and quantity of the loadable fresh assemblies were determined to enable the reactor core to maintain the core criticality over the entire cycle length. Afterwards, the genetic algorithm was used to optimize the reloading pattern of the reactor to obtain an arrangement with flat radial power distribution. In the second state, the optimization algorithm was free to select the type and number of fresh fuel assemblies to be able to search for an arrangement with the maximum effective multiplication factor and the safe power peaking factor. In addition, in order to ensure the safety and desirability of the proposed patterns in both states, a time-dependent examination of the thermo-neutronic behavior of the reactor core was carried out during the second cycle. With consideration of the new

  4. Design study on steam generator integration into the VVER reactor pressure vessel

    International Nuclear Information System (INIS)

    Hort, J.; Matal, O.

    2004-01-01

    The primary circuit of VVER (PWR) units is arranged into loops where the heat generated by the reactor is removed by means of main circulating pumps, loop pipelines and steam generators, all located outside the reactor pressure vessel. If the primary circuit and reactor core were integrated into one pressure vessel, as proposed, e.g., within the IRIS project (WEC), a LOCA situation would be limited by the reactor pressure vessel integrity only. The aim of this design study regarding the integration of the steam generator into the reactor pressure vessel was to identify the feasibility limits and some issues. Fuel elements and the reactor pressure vessel as used in the Temelin NPP were considered for the analysis. From among the variants analyzed, the variant with steam generators located above the core and vertically oriented circulating pumps at the RPV lower bottom seems to be very promising for future applications

  5. Inspection qualification programme for VVER reactors and review of round robin test results

    International Nuclear Information System (INIS)

    Horacek, L.; Zdarek, J.

    1998-01-01

    Experience obtained, especially from in-service inspections of VVER 440-type reactor pressure vessels and from the Czech round test trials with international participation of ultrasonic teams, has highlighted the need for an in-service inspection qualification programme in the Czech Republic focused on NDT procedures, equipment and personnel. Recently, several national and international regional projects included in the PHARE programme (projects 4.1.2/93 and 1.02/94), briefly described, have been initiated. These projects are to cover step by step the programme of the in-service inspection qualification in view of technical justification as well as of practical assessment-performance demonstration-for all the main VVER-type primary circuit components. (orig.)

  6. Core designs for new VVER reactors and operational experience of immediate prototypes

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Mokhov, V.; Ryzhov, S.

    2011-01-01

    The paper covers the recent improvements analyzed in order to implement the enhanced core performances. AES-2006 reactor core design is considered from the point of view of its application and improvement in the planned VVER-TOI project and of the possibilities of using the basic engineering solutions for the cores with spectral control. The discussion of several types of mixing grids considered in the paper involves a preliminary assessment of their efficiency and the information on their introduction into pilot operation at the VVER-1000 Units. Special attention is given to the results of the operation of immediate prototypes (TVS-2 and TVS-2M) that corroborate the reliability of the design both with regard for the core geometrical stability and fuel cladding tightness

  7. System analysis of nuclear safety of VVER reactor with MOX fuel

    Energy Technology Data Exchange (ETDEWEB)

    Klimov, A.D.; Zharkov, V.P.; Suslov, I.R. [Russia, Moscow Malaya Krasnoselskaya St. (Russian Federation); Boyarinov, V.F.; Kevrolev, V.V.; Tchibinyaev, A.V.; Tsibulskiy, V.F. [RRC KI, Russia, Moscow (Russian Federation); Kochurov, B.P. [ITEP, Russia, Moscow (Russian Federation); Giovanni, B. [NFPSC, FRAMATOME (France)

    2005-07-01

    The report presents a short summary of the results achieved in the ISTC (International Science and Technology Center) project 'System analysis of nuclear safety of VVER reactor with MOX fuel' (April 2005). The studies within the project are of a systematic character and include the solutions of 15 tasks. The report gives an overview of the major blocks of these tasks: neutron transport equation solution; calculations of isotopic vectors, analysis of the impact of uncertainties on predicted reactor functionals. The calculation methods, the verification results and the corresponding codes are briefly described. (authors)

  8. Corrosion particles in the primary coolant of VVER-440 reactors

    International Nuclear Information System (INIS)

    Vajda, N.; Molnar, Z.; Macsik, Z.; Szeles, E.; Hargittai, P.; Csordas, A.; Pinter, T.; Pinter, T.

    2010-01-01

    Corrosion and activity build-up processes are of major concern in ageing and life-extension of nuclear power reactors. Researches to study the migration of radioactive corrosion particles have been initiated at Paks Nuclear Power Plant (NPP), Hungary in order to better understand the corrosion of the primary circuit surfaces, the transport and activation of the particles of corrosion origin and their deposition on in-core and out-of-core surfaces. Radioactive corrosion particles were collected from the primary coolant and the steam generator surfaces of the 4 reactor units and subjected to detailed microanalytical and radioanalytical investigations. Scanning electron microscopy and energy dispersive X-ray microanalysis (SEM-EDX) were used to study the morphology and the composition of the matrix elements in the particles and the deposited corrosion layers. Particles identified by SEM-EDX were re-located under optical microscope by means of a coordinate transformation algorithm and were separated with a micromanipulator for further studies. Activities of γ emitting radionuclides were determined by high resolution γ spectrometry, and those of β decaying isotopes were measured by liquid scintillation (LS) spectrometry after radiochemical processing. High sensitivity of the nuclear measuring techniques allowed us to determine the low activity concentrations of the long-lived radionuclides, i.e. 60 Co, 54 Mn, 63 Ni, 55 Fe in the individual particles. Finally, high resolution sector-field inductively coupled plasma mass spectrometry (SF-ICP-MS) was applied to determine the ultralow concentrations of Co, Fe, Ni in the same particles. Specific activities of 60 Co/Co, 54 Mn/Fe, 55 Fe/Fe and 63 Ni/Ni were derived from the measured activity and concentration data. Specific activities of the radioactive corrosion products reveal the history of activity buildup processes in the particle. Typically, Fe-Cr-Ni oxide particles formed as a result of corrosion of the steel

  9. The influence of changes in the VVER-1000 fuel assembly shape during operation on the power density distribution

    Energy Technology Data Exchange (ETDEWEB)

    Shishkov, L. K., E-mail: Shishkov-LK@nrcki.ru; Gorodkov, S. S.; Mikailov, E. F.; Sukhino-Homenko, E. A.; Sumarokova, A. S., E-mail: Sumarokova-AS@nrcki.ru [National Research Center Kurchatov Institute (Russian Federation)

    2016-12-15

    A new approach to calculation of the coefficients of sensitivity of the fuel pin power to deviations in gap sizes between fuel assemblies of the VVER-1000 reactor during its operation is proposed. It is shown that the calculations by the MCU code should be performed for a full-size model of the core to take the interference of the gap influence into account. In order to reduce the conservatism of calculations, the coolant density and coolant temperature feedbacks should be taken into account, as well as the fuel burnup.

  10. A study of different cases of VVER reactor core flooding in a large break loss of coolant accident

    International Nuclear Information System (INIS)

    Bezrukov, Y.A.; Schekoldin, V.I.; Zaitsev, S.I.; Churkin, A.N.; Lisenkov, E.A.

    2016-01-01

    The paper covers a brief review of reflooding studies performed in different countries and the relevant tests performed in OKB GIDROPRESS (Russia) are discussed in more detail. The OKB GIDROPRESS test facility simulates the primary circuit of the VVER-440 reactor, with a full-scale fuel assembly (FA) mockup as the core simulator. The VVER core reflooding was studied in a FA mockup containing 126 fuel rod simulators with axial power peaking. The experiments were performed for two types of flooding. The first type is top flooding of the empty (steamed) FA mockup. The second type is bottom flooding of the FA mockup with level of boiling water. The test parameters are as follows: the range of the supplied power to the bundle is from 40 to 320 kW, the cooling water flow rate is from 0.04 to 1.1 kg/s, the maximum temperature of the fuel rod simulator is 800 C. degrees and the linear heat flux is from 0.1 to 1.0 kW/m. The test results were used for computer code validation, especially for the TRAP package code. The experiments show that as the transverse dimension of the FA mockup increases, the flow choking of the water supplied from the top by the steam flow significantly decreases

  11. New treatment centers for radioactive waste from Russian designed VVER-reactors

    International Nuclear Information System (INIS)

    Chrubasik, A.

    1997-01-01

    The nuclear power plants using Russian designed VVER-type reactors, were engineered and designed without any wastes treatment facilities. The liquid and solid waste were collected in storage tanks and shelters. After many years of operation, the storage capabilities are exhausted. The treatment of the stored and still generated waste represents a problem of reactor safety and requires a short term solution. NUKEM has been commissioned to design and construct several new treatment centers to remove and process the stored waste. This paper describes the process and lessons learned on the development of this system. The new radioactive waste treatment center (RWTC) includes comprehensive systems to treat both liquid and solid wastes. The process includes: 1) treatment of evaporator concentrates, 2) treatment of ion exchange resins, 3) treatment of solid burnable waste, 4) treatment of liquid burnable waste, 5) treatment of solid decontaminable waste, 6) treatment of solid compactible waste. To treat these waste streams, various separate systems and facilities are needed. Six major facilities are constructed including: 1. A sorting facility with systems for waste segregation. 2. A high-force compactor facility for volume reduction of non-burnable waste. 3. An incinerator facility for destruction of: 1) solid burnable waste, 2) liquid burnable waste, 3) low level radioactive ion exchange resins. 4. A facility for melting of incineration residue. 5. A cementation facility for stabilization of: 1) medium level radioactive ion exchange resins, 2) solid non compactible waste, 3) compacted solid waste. 6. Separation of radionuclides from evaporator concentrates. This presentation will address the facilities, systems, and lessons learned in the development of the new treatment centers. (author)

  12. Study of Fast Transient Pressure Drop in VVER-1000 Nuclear Reactor Using Acoustic Phenomenon

    Directory of Open Access Journals (Sweden)

    Soroush Heidari Sangestani

    2018-01-01

    Full Text Available This article aims to simulate the sudden and fast pressure drop of VVER-1000 reactor core coolant, regarding acoustic phenomenon. It is used to acquire a more accurate method in order to simulate the various accidents of reactor core. Neutronic equations should be solved concurrently by means of DRAGON 4 and DONJON 4 coupling codes. The results of the developed package are compared with WIMS/CITATION and final safety analysis report of Bushehr VVER-1000 reactor (FSAR. Afterwards, time dependent thermal-hydraulic equations are answered by employing Single Heated Channel by Sectionalized Compressible Fluid method. Then, the obtained results were validated by the same transient simulation in a pressurized water reactor core. Then, thermal-hydraulic and neutronic modules are coupled concurrently by use of producing group constants regarding the thermal feedback effect. Results were compared to the mentioned transient simulation in RELAP5 computer code, which show that mass flux drop is sensed at the end of channel in several milliseconds which causes heat flux drop too. The thermal feedback resulted in production of some perturbations in the changes of these parameters. The achieved results for this very fast pressure drop represent accurate calculations of thermoneutronic parameters fast changes.

  13. The strength of the reactor cavity of VVER-1000 NPP against steam explosion

    International Nuclear Information System (INIS)

    Varpasuo, P.

    1995-01-01

    The reactor cavity of VVER-1000 NPP is a thick-walled, cylindrical reinforced concrete structure. In case of molten core-water reaction during the severe accident the load carrying capacity of the cavity structure is of interest against the short impulse type loading caused by the steam explosion phenomenon. The assumed size of the impulse was 20 kPa-s and the duration was 10 ms. The static analysis of the structure used the ABAQUS/STANDARD and ANSYS codes. The material properties in both runs were specified to be elasto-plastic, and the cracking of concrete was taken into account. (author). 2 refs., 5 figs

  14. Calculation with MCNP of capture photon flux in VVER-1000 experimental reactor.

    Science.gov (United States)

    Töre, Candan; Ortego, Pedro

    2005-01-01

    The aim of this study is to obtain by Monte Carlo method the high energy photon flux due to neutron capture in the internals and vessel layers of the experimental reactor LR-0 located in REZ, Czech Republic, and loaded with VVER-1000 fuel. The calclated neutron, photon and photon to neutron flux ratio are compared with experimental measurements performed with a multi-parameter stilbene detector. The results show clear underestimation of photon flux in downcomer and some overestimation at vessel surface and 1/4 thickness but a good fitting for deeper points in vessel.

  15. Issues in the use of Weapons-Grade MOX Fuel in VVER-1000 Nuclear Reactors: Comparison of UO2 and MOX Fuels

    Energy Technology Data Exchange (ETDEWEB)

    Carbajo, J.J.

    2005-05-27

    The purpose of this report is to quantify the differences between mixed oxide (MOX) and low-enriched uranium (LEU) fuels and to assess in reasonable detail the potential impacts of MOX fuel use in VVER-1000 nuclear power plants in Russia. This report is a generic tool to assist in the identification of plant modifications that may be required to accommodate receiving, storing, handling, irradiating, and disposing of MOX fuel in VVER-1000 reactors. The report is based on information from work performed by Russian and U.S. institutions. The report quantifies each issue, and the differences between LEU and MOX fuels are described as accurately as possible, given the current sources of data.

  16. Progress in the U.S. department of energy sponsored in-depth safety assessments of VVER and RBMK reactors

    International Nuclear Information System (INIS)

    Binder, J.L.; Petri, M.C.; Pasedag, W.F.

    2001-01-01

    Since the disastrous accident at Chernobyl Nuclear Power Plant Unit 4 in 1986, there has been international recognition of the safety concerns posed by the operation of 67 Soviet-designed commercial nuclear reactors. These reactors are operated in eight countries from the former Soviet Union and its former satellite states in Central and Eastern Europe. The majority of these plants are in the Russian Federation (30 units) and Ukraine (14 units). New plants are in various stages of construction. U.S. support to improve the safety of Soviet-designed reactors over the past decade has been intended to enhance operational safety, provide for risk-reduction measures, and enhance regulatory capability. The U.S. approach to improving the safety of Soviet-designed reactors has matured into a large multi-year program known as the Soviet-Designed Reactor Safety Program that is managed by the U.S. Department of Energy (US DOE). The mission of the program is to implement a self-sustaining nuclear safety improvement program that would lead to internationally accepted safety practices at the plants. Those practices would create a safety culture that would be reflected in the operation, regulation, and professional attitudes of the designers, operators, and regulators of the nuclear facilities. A key component of this larger program has been the Plant Safety Evaluation Program, which supports in-depth safety assessments of VVER and RBMK plants. (author)

  17. Evaluation of an experiment modelling heat transfer from the melt pool for use in VVER 440/213 reactors

    International Nuclear Information System (INIS)

    Skop, J.

    2003-12-01

    The strategy of confining core melt within the reactor vessel is among promising strategies to mitigate severe accidents of VVER 440/213 reactors. This strategy consists in residual heat removal from the melt by external vessel cooling from the outside, using water from the flooded reactor downcomer. This approach can only be successful if the critical heat flux on the external vessel surface is not exceeded. This can be assessed based on the parameters of heat transfer from the core melt pool in the conditions of natural circulation within the pool. Those parameters are the subject of the report. A basic description of the terms and physical basis of the strategy of confining core melt inside the vessel is given in Chapter 2, which also briefly explains similarity theory, based on which the results obtained on experimental facilities, using simulation materials, can be related to the actual situation inside a real reactor. Chapter 3 presents an overview of experimental work addressing the characteristics of heat transfer from the core melt pool in natural circulation conditions and a description of the experimental facilities. An overview of the results emerging from the experiments and their evaluation with respect to their applicability to reactors in Czech nuclear power plants are given in Chapter 4

  18. Isothermal and thermal-mechanical fatigue of VVER-440 reactor pressure vessel steels

    Science.gov (United States)

    Fekete, Balazs; Trampus, Peter

    2015-09-01

    The fatigue life of the structural materials 15Ch2MFA (CrMoV-alloyed ferritic steel) and 08Ch18N10T (CrNi-alloyed austenitic steel) of VVER-440 reactor pressure vessel under completely reserved total strain controlled low cycle fatigue tests were investigated. An advanced test facility was developed for GLEEBLE-3800 physical simulator which was able to perform thermomechanical fatigue experiments under in-service conditions of VVER nuclear reactors. The low cycle fatigue results were evaluated with the plastic strain based Coffin-Manson law, and plastic strain energy based model as well. It was shown that both methods are able to predict the fatigue life of reactor pressure vessel steels accurately. Interrupted fatigue tests were also carried out to investigate the kinetic of the fatigue evolution of the materials. On these samples microstructural evaluation by TEM was performed. The investigated low cycle fatigue behavior can provide reference for remaining life assessment and lifetime extension analysis.

  19. Study of long-term loss of all AC power supply sources for VVER-1000/V320 in connection with application of new engineering safety features for SAMG

    International Nuclear Information System (INIS)

    Borisov, Evgeni; Grigorov, Dobrin; Mancheva, Kaliopa

    2013-01-01

    Highlights: • In this study we presented analysis for a new SAMG approach. • The approach is applicable for all PWR reactors from 2nd generation. • We investigated two scenarios with total black out. • The RELAP/MOD 3.2 computer code is used in performing the analyses. - Abstract: This paper presents the results of analysis for application of a new Severe Accident Management Guideline (SAMG) approach which is specifically applied for VVER-1000/B320 reactor installations. In general, this innovative approach is fully applicable for all the pressurized water reactors from second generation. The purposes of the analysis for the new SAMG approach application are as follows: • To represent suggestions for new engineering safety features application for SAMG strategies. • To assess the applicability of the new engineering safety features and means for SAMG strategies in case of loss of all off-site power supply sources for VVER-1000/B320 reactor installations. • To represent important operator actions and to analyse the effectiveness of these actions for accidents management in compliance with the new approach. • The RELAP5/MOD3.3 computer code has been used in performing the analyses in a VVER-1000 Nuclear Power Plant (NPP) model. The input data deck for the analysis is optimized, verified and validated

  20. Conducting water chemistry of the secondary coolant circuit of VVER-based nuclear power plant units constructed without using copper containing alloys

    Science.gov (United States)

    Tyapkov, V. F.

    2014-07-01

    The secondary coolant circuit water chemistry with metering amines began to be put in use in Russia in 2005, and all nuclear power plant units equipped with VVER-1000 reactors have been shifted to operate with this water chemistry for the past seven years. Owing to the use of water chemistry with metering amines, the amount of products from corrosion of structural materials entering into the volume of steam generators has been reduced, and the flow-accelerated corrosion rate of pipelines and equipment has been slowed down. The article presents data on conducting water chemistry in nuclear power plant units with VVER-1000 reactors for the secondary coolant system equipment made without using copper-containing alloys. Statistical data are presented on conducting ammonia-morpholine and ammonia-ethanolamine water chemistries in new-generation operating power units with VVER-1000 reactors with an increased level of pH. The values of cooling water leaks in turbine condensers the tube system of which is made of stainless steel or titanium alloy are given.

  1. Component vibration of VVER-reactors - diagnostics and modelling

    International Nuclear Information System (INIS)

    Altstadt, E.; Scheffler, M.; Weiss, F.P.

    1994-01-01

    The model comprises the whole primary circuit, including steam generators, loops, coolant pumps, main isolating valves and certainly the reactor pressure vessel and its internals. It was developed using the finite-element-code ANSYS. The model has a modular structure, so that various operational and assembling states can easily be considered. (orig./DG)

  2. Design issues concerning Iran's Bushehr nuclear power plant VVER-1000 conversion

    International Nuclear Information System (INIS)

    Carson, C.F.

    1996-01-01

    On January 8, 1995, the Atomic Energy Organization of Iran (AEOI) signed a contract for $800 million with the Russian Federation Ministry for Atomic Energy (Minatom) to complete Bushehr nuclear power plant (BNPP) unit 1. The agreement called for a Russian VVER-1000/320 pressurized water reactor (PWR) to be successfully installed into the existing German-built BNPP facilities in 5 yr. System design differences, bomb damage, and environmental exposure are key issues with which Minatom must contend in order to fulfill the contract. The AEOI under the Shah of Iran envisioned Bushehr as the first of many nuclear power plants, with Iran achieving 24 GW(electric) by 1993 and 34 GW(electric) by 2000. Kraftwerk Union AG (KWU) began construction of the two-unit plant near the Persian Gulf town of Halileh in 1975. Unit 1 was ∼80% complete and unit 2 was ∼50% complete when construction was interrupted by the 1979 Iranian Islamic revolution. Despite repeated AEOI attempts to lure KWU and other companies back to Iran to complete the plant, Western concerns about nuclear proliferation in Iran and repeated bombings of the plant during the 1980-1988 Iran-Iraq war dissuaded Germany from resuming construction

  3. Perspectives for practical application of the combined fuel kernels in VVER-type reactors

    International Nuclear Information System (INIS)

    Baranov, V.; Ternovykh, M.; Tikhomirov, G.; Khlunov, A.; Tenishev, A.; Kurina, I.

    2011-01-01

    The paper considers the main physical processes that take place in fuel kernels under real operation conditions of VVER-type reactors. Main attention is given to the effects induced by combinations of layers with different physical properties inside of fuel kernels on these physical processes. Basic neutron-physical characteristics were calculated for some combined fuel kernels in fuel rods of VVER-type reactors. There are many goals in development of the combined fuel kernels, and these goals define selecting the combinations and compositions of radial layers inside of the kernels. For example, the slower formation of the rim-layer on outer surface of the kernels made of enriched uranium dioxide can be achieved by introduction of inner layer made of natural or depleted uranium dioxide. Other potential goals (lower temperature in the kernel center, better conditions for burn-up of neutron poisons, better retention of toxic materials) could be reached by other combinations of fuel compositions in central and peripheral zones of the fuel kernels. Also, the paper presents the results obtained in experimental manufacturing of the combined fuel pellets. (authors)

  4. Experience in modernization of safety I and C in VVER 440 nuclear power plants Bohunice V1 and Paks

    International Nuclear Information System (INIS)

    Martin, M.

    2000-01-01

    For nuclear power plants which have been in operation for more than 15 years, backfitting or even complete replacement of the instrumentation and control (I and C) equipment becomes an increasingly attractive option, motivated not only by the objective to reduce the cost of I and C system maintenance and repair but also to prolong or at least to safeguard the plant life-time: optimized spare-part management through use of standard equipment; reduction of number and variety of different items of equipment by implementing functions stepwise in application software; adding new functionality in the application software which was not possible in the old technology due to lack of space; safeguarding of long-term After-Sales-Service. Some years ago Bohunice V1 NPP, Slovak Republic and Paks NPP, Hungary intended to replace parts of their Safety I and C, mainly the Reactor Trip System, the Reactor Limitation System and the Neutron Flux Excore Instrumentation and Monitoring Systems. After a Basic Engineering Phase in Bohunice V1 and a Feasibility Study in Paks both plants decided to use the Siemens' Digital Safety I and C System TELEPERM XS to modernize their plants. Both Bohunice, Unit 2 and Paks, Unit 1 have been back on line for over six months with the new Digital Safety I and C. At the present time Bohunice, Unit 1 and within the next few months Paks, Unit 2 will be replaced. Trouble-free start-ups and no major problems under operation in the first two plants were based on: thorough understanding of the VVER 440 technology; comprehensive planning together with the plant operators and authorities; the possibility to adapt TELEPERM XS to every plant type; the execution of extensive pre-operational tests. Regarding these modernization measures Siemens, as well as the above Operators, have gained considerable experience in the field of I and C Modernization in VVER 440 NPPs. Important aspects of this experience are: how to transfer the VVER technology to TELEPERM XS; how to

  5. A Roadmap and Discussion of Issues for Physics Analyses Required to Support Plutonium Disposition in VVER-1000 Reactors

    International Nuclear Information System (INIS)

    Primm, R.T.; Drischler, J.D.; Pavlovichev, A.M.; Styrine, Y.A.

    2000-01-01

    The purpose of this report is to document the physics analyses that must be performed to successfully disposition weapons-usable plutonium in VVER-1000 reactors in the Russian Federation. The report is a document to support programmatic and financial planning. It does not include documentation of the technical procedures by which physics analyses are performed, nor are the results of any analyses included

  6. A Roadmap and Discussion of Issues for Physics Analyses Required to Support Plutonium Disposition in VVER-1000 Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Primm, R.T.; Drischler, J.D.; Pavlovichev, A.M. Styrine, Y.A.

    2000-06-01

    The purpose of this report is to document the physics analyses that must be performed to successfully disposition weapons-usable plutonium in VVER-1000 reactors in the Russian Federation. The report is a document to support programmatic and financial planning. It does not include documentation of the technical procedures by which physics analyses are performed, nor are the results of any analyses included.

  7. Current problems of VVER-1000 reactor core operation in Ukraine

    International Nuclear Information System (INIS)

    Bykov, A.

    2000-01-01

    Planned control rod drop time registration was passed two times a year per reactor unit. In 1992-1993 some control rods at almost all WWER-1000 units exceed the prescribed 4 second time limit. More than 7000 individual control rod time tests were made from the main correction measures. The following conclusions have been made from the current statistics data: (a) The main role of the vibration factor is proven in the fuel assembly (FA) bowing process. The greatest drop times and maximum of bowing values are concentrated at the vibration zone (2-4 FA rows from the reactor partition). The first FA row seems to be stable due to the interaction with the reactor partition; (b) Bowing relaxation will proceed during several fuel cycles (estimated value is 4-6), and depends on previous FA use history. It seems to be proven that previously bowed FAs effect the new FA, so previously bowed FAs are straightened until the middle of the fuel cycle. At some reactor units small drop time reduction is observed up to half of the fuel cycle from the start time values; (c) Control rod drop medium time (t) has almost linear dependence on operation time (τ) (t=k x τ + b]. Estimated by the method of least squares, values of k and b differ from unit to unit and from cycle to cycle. Values of k and b are in following ranges: b=2.0 - 2.6 seconds, k=5-50x10 -4 seconds per effective operation day; (d) Control rod drop time distribution changes through operation time. The position of maximum starts to shift after 240 effective days, and the form of the distribution start to change at the same time. Before 240 effective days, the distribution essentially does not change. To guarantee that the control rod system reliability is now within prescribed limits, we should continue testing. Additional analysis is needed. Test frequency can be reduced to avoid additional unreasonable transients. (authors)

  8. Qualification of the nuclear reactor core model DYN3D coupled to the thermohydraulic system code ATHLET, applied as an advanced tool for accident analysis of VVER-type reactors. Final report

    International Nuclear Information System (INIS)

    Grundmann, U.; Kliem, S.; Krepper, E.; Mittag, S; Rohde, U.; Schaefer, F.; Seidel, A.

    1998-03-01

    The nuclear reactor core model DYN3D with 3D neutron kinetics has been coupled to the thermohydraulic system code ATHLET. In the report, activities on qualification of the coupled code complex ATHLET-DYN3D as a validated tool for the accident analysis of russian VVER type reactors are described. That includes: - Contributions to the validation of the single codes ATHLET and DYN3D by the analysis of experiments on natural circulation behaviour in thermohydraulic test facilities and solution of benchmark tasks on reactivity initiated transients, - the acquisition and evaluation of measurement data on transients in nuclear power plants, the validation of ATHLET-DYN3D by calculating an accident with delayed scram and a pump trip in VVER plants, - the complementary improvement of the code DYN3D by extension of the neutron physical data base, implementation of an improved coolant mixing model, consideration of decay heat release and xenon transients, - the analysis of steam leak scenarios for VVER-440 type reactors with failure of different safety systems, investigation of different model options. The analyses showed, that with realistic coolant mixing modelling in the downcomer and the lower plenum, recriticality of the scramed reactor due to overcooling can be reached. The application of the code complex ATHLET-DYN3D in Czech Republic, Bulgaria and the Ukraine has been started. Future work comprises the verification of ATHLET-DYN3D with a DYN3D version for the square fuel element geometry of western PWR. (orig.) [de

  9. Axial stability of VVER-1000 reactor with control with minimum standard deviation

    International Nuclear Information System (INIS)

    Afanas'ev, A.M.; Torlin, B.Z.

    1980-01-01

    Results are given of investigations on the stability of a reactor which has, in addition to an automatic controller, a height distribution regulator (HDR) based on an auxiliary control rod (CR) or a special shortened absorption rod (SAR). The HDR was controlled by using either a special ionization chamber (IC), generating an imbalance signal which sets the CR in motion, or two ionization chambers whose difference signal causes a displacement of the SAR. Since data from numerous pickups can be used to control the height field of the VVER-1000, it is of interest to analyze how this would affect the stability of the reactor. The analysis was carried out with the improved IRINA programs. 11 refs

  10. Nuclear power reactors

    International Nuclear Information System (INIS)

    1982-11-01

    After an introduction and general explanation of nuclear power the following reactor types are described: magnox thermal reactor; advanced gas-cooled reactor (AGR); pressurised water reactor (PWR); fast reactors (sodium cooled); boiling water reactor (BWR); CANDU thermal reactor; steam generating heavy water reactor (SGHWR); high temperature reactor (HTR); Leningrad (RMBK) type water-cooled graphite moderated reactor. (U.K.)

  11. Evaluation of VVER-1200/V-491 reactor pressure vessel integrity during large break LOCA along with SBO using MELCOR 1.8.6

    International Nuclear Information System (INIS)

    Bui Thi Hoa; Tran Chi Thanh

    2015-01-01

    After Fukushima accident and stress test recommended by IAEA for existing reactors, higher safety requirements are enforced upon nuclear power plants during design extension and severe accident conditions. Based on those arguments, Vietnam Government requests a lot of effective safety solutions, in designs proposed for the nuclear power plants in Ninh Thuan province of Vietnam, which can prevent the accident progression toward severe accidents and mitigate severe accident consequences. One of safety requirements is related to delay time of core melt during design extension condition. Especially, if the worst case of accidents occurs, the reactor vessel integrity must be maintained at least 24 hours from the beginning of the accident. With the aim at investigation of Reactor Pressure Vessel (RPV) integrity, in this study, MELCOR 1.8.6 code is used to evaluate the integrity of RPV lower head for VVER-1200/V-491 reactor during a Large Break Loss of Coolant Accident (LBLOCA) in combination with Station Blackout (SBO) event. The study figures out several parameters related to melt down progress such as: rupture position and rupture timing, the amount of hydrogen generated. Availability of the second stage hydro-accumulators (HA2) in the VVER-1200/V-491 is assumed as an additional improvement to delay the timing of core melt as well as to maintain the vessel integrity for long-term. (author)

  12. Research on the reactor physics and reactor safety of VVER reactors. AER Symposium 2016

    Energy Technology Data Exchange (ETDEWEB)

    Kliem, S.

    2017-09-15

    The selected paperscan be attributed to the following main subjects: Reactor start-up tests and use of corresponding data for code validation, code development and application, approaches for safety analyses, closure of nuclear fuel cycle, prospective reactor concepts.

  13. An experimental investigation of 1% SBLOCA on PSB-VVER test facility

    Energy Technology Data Exchange (ETDEWEB)

    Lipatov, I.A.; Dremin, G.I.; Galtchanskaia, S.A.; Gorbunov, Yu.S. [Electrogorsk Research and Engineering Center, EREC, Electrogorsk (Russian Federation); Elkin, I.V. [Russian Research Centre Kurchatov Inst., Moscow (Russian Federation)

    2001-07-01

    The paper presents the results of the three tests carried out in the PSB-VVER large-scale integral test facility. The PSB-VVER test facility is a four loop, full pressure scaled down model bearing structural similarities to the primary system of the NRP with VVER-1000 Russian design reactor. Volume-power scale is 1/300 while elevation scale is 1/1. (orig.)

  14. IVO participation in IAEA benchmark for VVER-type nuclear power plants seismic analysis and testing

    International Nuclear Information System (INIS)

    Varpasuo, P.

    1997-12-01

    This study is a part of the IAEA coordinated research program 'Benchmark study for the Seismic Analysis and Testing of VVER Type NPPs'. The study reports the numerical simulation of the blast test for Paks and Kozloduy nuclear power plants beginning from the recorded free-field response and computing the structural response at various points inside the reactor building. The full-scale blast tests of the Paks and Kozloduy NPPs took place in December 1994 and in July 1996. During the tests the plants operated normally. The instrumentation for the tests consisted of 52 recording channels with 200 Hz sampling rate. Detonating 100 kg charges in 50-meter deep boreholes at 2.5-km distance from the plant carried out the blast tests. The 3D structural models for both reactor buildings were analyzed in the frequency domain. The number of modes extracted in both cases was about 500 and the cut-off frequency was 25 Hz. In the response history run the responses of the selected points were evaluated. The input values for response history run were the three components of the excitation, which were transformed from time domain to the frequency domain with the aid of Fourier transform. The analysis was carried out in frequency domain and responses were transferred back to time domain with inverse Fourier transform. The Paks and Kozloduy blast tests produced a wealth of information on the behavior of the nuclear power plant structures excited by blast type loads containing also the low frequency wave train if albeit with small energy content. The comparison of measured and calculated results gave information about the suitability of the selected analysis approach for the investigated blast type loading

  15. Analysis of the VVER-440 reactor steam generator secondary side with the RELAP5/MOD3 code

    International Nuclear Information System (INIS)

    Tuunanen, J.

    1993-01-01

    Nuclear Engineering Laboratory of the Technical Research Centre of Finland has widely used RELAP5/MOD2 and -MOD3 codes to simulate horizontal steam generators. Several models have been developed and successfully used in the VVER-safety analysis. Nevertheless, the models developed have included only rather few nodes in the steam generator secondary side. The secondary side has normally been divided into about 10 to 15 nodes. Since the secondary side at the steam generators of VVER-440 type reactors consists of a rather large water pool, these models were only roughly capable to predict secondary side flows. The paper describes an attempt to use RELAP5/MOD3 code to predict secondary side flows in a steam generator of a VVER-440 reactor. A 2D/3D model has been developed using RELAP5/MOD3 codes cross-flow junctions. The model includes 90 volumes on the steam generator secondary side. The model has been used to calculate steady state flow conditions in the secondary side of a VVER-440 reactor steam generator. (orig.) (1 ref., 9 figs., 2 tabs.)

  16. Nuclear fuel for VVER reactors. Actual state and trends

    International Nuclear Information System (INIS)

    Molchanov, V.

    2009-01-01

    The implementation of 2nd generation of FA with the following performance characteristics: 1) Average FP failure factor during operation is less than 1x10 -6 ; 2) Fuel burn-up: up to 60 GWxd/tHM; 3) 5-year fuel cycle; 4) Unit thermal power uprate up to 110% N nom ; 5) Load Follow Mode (97,5±2,5% and 100-75-100% N nom ) is presented. A new generation of FA (TVSA and TVS-2) is developed, implemented and successfully operated at Russian, Ukrainian and Bulgarian NPPs providing: Safe and reliable operation cycle of 6 years; Assembly burn-up - up to 60 GWxd/tHM; Load Follow Mode. For satisfaction of customer needs regarding nuclear fuel performance the following development of FA design is under way: Power uprate up to 104% N nom and Fuel cycles length up to 18 months

  17. Burnup influence on the VVER-1000 reactor vessel neutron fluence evaluation

    International Nuclear Information System (INIS)

    Panayotov, I.; Mihaylov, N.; Ilieva, K.; Kirilova, D.; Manolova, M.

    2009-01-01

    The neutron fluence of the vessels of the reactors is determined regularly accordingly the RPV Surveillance Program of the Kozloduy NPP Unit 5 and 6 in order to assess the state of the metal vessel and their radiation damaging. The calculations are carried out by the method of discrete ordinates used in the TORT program for operated reactor cycles. An average reactor spectrum corresponding to fresh U-235 fuel is used as an input neutron source. The impact of the burn up of the fuel on the neutron fluence of VVER-1000 reactor vessel is evaluated. The calculations of isotopic concentrations of U-235 and Pu-239 corresponding to 4 years burn up were performed by the module SAS2H of the code system SCALE 4.4. Since fresh fuel or 4 years burn up fuel assembly are placed in periphery of reactor core the contribution of Pu-239 of first year burn up and of 4 years burn up is taken in consideration. Calculations of neutron fluence were performed with neutron spectrum for fresh fuel, for 1 year and for 4 years burn up fuel. Correction factors for neutron fluence at the inner surface of the reactor vessel, in 1/4 depth of the vessel and in the air behind the vessel were obtained. The correction coefficient could be used when the neutron fluence is assessed so in verification when the measured activity of ex-vessel detectors is compared with calculated ones. (authors)

  18. Microstructure and embrittlement of VVER 440 reactor pressure vessel steels; Microstructure et fragilisation des aciers de cuve des reacteurs nucleaires VVER 440

    Energy Technology Data Exchange (ETDEWEB)

    Hennion, A

    1999-03-15

    27 VVER 440 pressurised water reactors operate in former Soviet Union and in Eastern Europe. The pressure vessel, is made of Cr-Mo-V steel. It contains a circumferential arc weld in front of the nuclear core. This weld undergoes a high neutron flux and contains large amounts of copper and phosphorus, elements well known for their embrittlement potency under irradiation. The embrittlement kinetic of the steel is accelerated, reducing the lifetime of the reactor. In order to get informations on the microstructure and mechanical properties of these steels, base metals, HAZ, and weld metals have been characterized. The high amount of phosphorus in weld metals promotes the reverse temper embrittlement that occurs during post-weld heat treatment. The radiation damage structure has been identified by small angle neutron scattering, atomic probe, and transmission electron microscopy. Nanometer-sized clusters of solute atoms, rich in copper with almost the same characteristics as in western pressure vessels steels, and an evolution of the size distribution of vanadium carbides, which are present on dislocation structure, are observed. These defects disappear during post-irradiation tempering. As in western steels, the embrittlement is due to both hardening and reduction of interphase cohesion. The radiation damage specificity of VVER steels arises from their high amount of phosphorus and from their significant density of fine vanadium carbides. (author)

  19. Plasma, a plant safety monitoring and assessment system for VVER-440 reactors

    Energy Technology Data Exchange (ETDEWEB)

    Hornaes, A.; Hulsund, J. E. [Institutt for energiteknikk (IFE), OECD Halden Reactor Project, Halden (Norway); Lipcsei, S.; Major, Cs.; Racz, A.; Vegh, J. [KFKI, Atomic Energy Research Institute, Budapest (Hungary); Eiler, J. [Paks, Nuclear Power Plant Ltd, Paks (Hungary)

    1999-05-15

    The objective with the Plant Safety Monitoring and Assessment System (PLASMA) is to develop an operator support system to support the execution of new symptom-based Emergency Operating Procedures for application in VVER reactors, with the Paks NPP in Hungary as the target plant. Many of the VVER reactors are rewriting their EOPs to comply more with Western standards of symptom-based EOPs. In this connection it is desirable to improve the data validation, information integration and presentation for operators when executing the EOPs. The entry-point to a symptom-oriented procedure is defined by the occurrence of a well-defined reactor operation status, with all its symptoms. However, the application of the EOF benefits from an operator support system, which performs plant status and symptom identification reliably and accurately. The development of the PLASMA system is a joint venture between Institutt for energiteknikk (IFE) and KFKI with the NPP Paks as the target plant. The project has been initiated and partly funded by the Science and Technology Agency (STA), Japan through the OECD NEA assistance program. In Hungary, considerable effort has concentrated on the safety reassessment of the Paks NPP and new EOPs are being written, but no comprehensive Operator Support System (OSS) for plant safety assessment is installed. Some safety parameter display functions are incorporated into diverse operator support systems, but an online 'plant safety monitoring and assessment system' is still missing. The present project comprises designing, constructing, testing and installing such an OSS, which to a great extent could support plant operators in their safety assessment work (author) (ml)

  20. Calculation of spatial weighting functions for ex-core detectors of VVER-440 reactors by Monte Carlo method

    International Nuclear Information System (INIS)

    Berki, T.

    2003-01-01

    The signal of ex-core detectors depends not only on the total power of a reactor but also on the power distribution. The spatial weighting function establishes correspondence between the power distribution and the detector signal. The weighting function is independent of the power distribution. The weighting function is used for detector-response analyses, for example in the case of rod-drop experiments. (1) The paper describes the calculation and analysis of the weighting function of a VVER-440. The three-dimensional Monte Carlo code MCNP is used for the evaluation. Results from forward and adjoint calculations are compared. The effect of the change in the concentration of boric acid is also investigated. The evaluation of the spatial weighting function is a fixed-source neutron transport problem, which can be solved much faster by adjoint calculation, however forward calculations provide more detailed results. It is showed that the effect of boric acid upon the weighting function is negligible. (author)

  1. The in-core fuel management code system for VVER reactors

    International Nuclear Information System (INIS)

    Cada, R.; Krysl, V.; Mikolas, P.; Sustek, J.; Svarny, J.

    2004-01-01

    The structure and methodology of a fuel management system for NPP VVER 1000 (NPP Temelin) and VVER 440 (NPP Dukovany) is described. It is under development in SKODA JS a.s. and is followed by practical applications. The general objectives of the system are maximization of end of cycle reactivity, the minimization of fresh fuel inventory for the minimization of fed enrichment and minimization of burnable poisons (BPs) inventory. They are also safety related constraints in witch minimization of power peaking plays a dominant role. General structure of the system consists in preparation of input data for macrocode calculation, algorithms (codes) for optimization of fuel loading, calculation of fuel enrichment and BPs assignment. At present core loading can be calculated (optimized) by Tabu search algorithm (code ATHENA), genetic algorithm (code Gen1) and hybrid algorithm - simplex procedure with application of Tabu search algorithm on binary shuffling (code OPAL B ). Enrichment search is realized by the application of simplex algorithm (OPAL B code) and BPs assignment by module BPASS and simplex algorithm in OPAL B code. Calculations of the real core loadings are presented and a comparison of different optimization methods is provided. (author)

  2. RELAP5/MOD3.2 investigation of reactor vessel YR line capabilities for primary side depressurization during the TLFW in VVER1000/V320

    International Nuclear Information System (INIS)

    Gencheva, Rositsa V.; Stefanova, Antoaneta E.; Groudev, Pavlin P.

    2005-01-01

    During the development of Symptom Based Emergency Operating Procedures (SB-EOPs) for VVER-1000/V320 units at Kozloduy Nuclear Power Plant (NPP), a number of analyses have been performed using the RELAP5/MOD3.2 computer code. One of them is 'Investigation of reactor vessel YR line capabilities for primary side depressurization during the Total Loss of Feed Water (TLFW)'. The main purpose of these calculations is to evaluate the capabilities of YR line located at the top of the reactor vessel for primary side depressurization to the set point of High Pressure Injection System (HPIS) actuation and the abilities for successful core cooling after Feed and Bleed procedure initiation. For the purpose of this, operator action with 'Reactor vessel off-gas valve - 0.032 m' opening has been investigated. RELAP5/MOD3.2 computer code has been used to simulate the TLFW transient in VVER-1000 NPP model. This model was developed at Institute for Nuclear Research and Nuclear Energy - Bulgarian Academy of Sciences (INRNE-BAS), Sofia, for analyses of operational occurrences, abnormal events, and design basis scenarios. The model provides a significant analytical capability for the specialists working in the field of NPP safety

  3. Department of Energy's team's analyses of Soviet designed VVERs (water-cooled water-moderated atomic energy reactors)

    Energy Technology Data Exchange (ETDEWEB)

    1989-09-01

    This document contains apprendices A through P of this report. Topics discussed are: a cronyms and technical terms, accident analyses reactivity control; Soviet safety regulations; radionuclide inventory; decay heat; operations and maintenance; steam supply system; concrete and concrete structures; seismicity; site information; neutronic parameters; loss of electric power; diesel generator reliability; Soviet codes and standards; and comparisons of PWR and VVER features. (FI)

  4. Economical aspects of multiple plutonium and uranium recycling in VVER reactors

    Energy Technology Data Exchange (ETDEWEB)

    Alekseev, P.N.; Bobrov, E.A.; Dudnikov, A.A.; Teplov, P.S. [National Research Centre ' Kurchatov Institute' , Moscow (Russian Federation)

    2016-09-15

    The basic strategy of Russian Nuclear Energy development is the formation of the closed fuel cycle based on fast breeder and thermal reactors, as well as the solution of problems of spent nuclear fuel accumulation and availability of resources. Three options of multiple Pu and U recycling in VVER reactors are considered in this work. Comparison of MOX and REMIX fuel recycling approaches for the closed fuel cycle involving thermal reactors is presented. REMIX fuel is supposed to be fabricated from non-separated mixture of uranium and plutonium obtained in spent fuel reprocessing with further makeup by enriched U. These options make it possible to recycle several times the total amount of Pu and U obtained from spent fuel. The main difference is the full or partial fuel loading of the core by assemblies with recycled Pu. The third option presents the concept of heterogeneous arrangement of fuel pins made of enriched uranium and MOX in one fuel assembly. It should be noted that fabrication of all fuel assemblies with Pu requires the use of expensive manufacturing technology. These three options of core loading can be balanced with respect to maximum Pu and U involvement in the fuel cycle. Various physical and economical aspects of Pu and U multiple recycling for selected options are considered in this work.

  5. CFX-10 and RELAP5-3D simulations of coolant mixing phenomena in RPV of VVER-1000 reactors

    International Nuclear Information System (INIS)

    Terzuoli, F.; Moretti, F.; Melideo, D.; D'Auria, F.; Shkarupa, O.

    2006-01-01

    The present paper deals with numerical analyses of coolant mixing in the reactor pressure vessel of a VVER-1000 reactor, performed with the ANSYS CFX-10 CFD code and with the RELAP5-3D system code. In particular, the attention focused on the 'swirl' effect that has been observed to take place in the downcomer of such kind of reactor, with the aim of assessing the capability of the codes to predict that effect, and to understand the reasons for its occurrence. The results have been compared against experimental data from V1000CT-2 Benchmark. (author)

  6. VVER-specific features regarding core degradation - Status Report

    International Nuclear Information System (INIS)

    Hozer, Z.; Trambauer, K.; Duspiva, J.

    1999-01-01

    The objective of this report is to compare VVER reactors to pressurised water reactors (PWRs) of Western design from the point of view of core degradation phenomena using the terminology which was applied to the systematisation of severe accident phenomena in earlier CSNI reports. In the following the acronym 'PWR' is used for a PWR of Western design. The basic design features are described and the most important parameters are summarised in order to identify the differences between the two reactor types. In some specific cases the comparison shows more similarities with boiling water reactors (BWRs) than with PWRs. The known VVER experimental support is also summarised. RBMKs are not included in this report, as this reactor type is not operated in OECD countries, furthermore its design is completely different from those of VVERs and PWRs. The scope of this report is limited to in-vessel severe fuel damage phenomena. Neither thermal hydraulic processes involving no core degradation, nor containment phenomena, are discussed in detail. The VVER (water-cooled water-moderated power reactor) is a pressurised light water reactor of Soviet design. It operates on the same principles as a Western PWR reactor and uses similar technological systems. The primary coolant is pressurised water, which heats up in the reactor core and steam is produced on the secondary side of steam generators. The comparison of basic geometrical and technological parameters pointed out some differences between a PWR and a VVER, but it should be noted that differences exist even between two Western PWRs of different design. The VVER reactors are special types of PWRs, the most important design features of which are the horizontal steam generators and the hexagonal core structure. Similarity between PWR and VVER reactors was found in the comparison of dominant accidents sequences leading to core melt. The accident progression sequence consists of the same steps for VVERs and PWRs. The larger water

  7. Pressure loadings of Soviet-designed VVER [Water-Cooled, Water-Moderated Energy Reactor] reactor release mitigation structures from large-break LOCAs

    International Nuclear Information System (INIS)

    Sienicki, J.J.; Horak, W.C.

    1989-01-01

    Analyses have been carried out of the pressurization of the accident release mitigation structures of Soviet-designed VVER (Water-Cooled, Water-Moderated Energy Reactor) pressurized water reactors following large-break loss-of-coolant accidents. Specific VVER systems for which calculations were performed are the VVER-440 model V230, VVER-440 model V213, and VVER-1000 model V320. Descriptions of the designs of these and other VVER models are contained in the report DOE/NE-0084. The principal objective of the current analyses is to calculate the time dependent pressure loadings inside the accident localization or containment structures immediately following the double-ended guillotine rupture of a primary coolant pipe. In addition, the pressures are compared with the results of calculations of the response of the structures to overpressure. Primary coolant system thermal hydraulic conditions and the fluid conditions at the break location were calculated with the RETRAN-02 Mod2 computer code (Agee, 1984). Pressures and temperatures inside the building accident release mitigation structures were obtained from the PACER (Pressurization Accompanying Coolant Escape from Ruptures) multicompartment containment analysis code developed at Argonne National Laboratory. The analyses were carried out using best estimate models and conditions rather than conservative, bounding-type assumptions. In particular, condensation upon structure and equipment was calculated using correlations based upon analyses of the HDR, Marviken, and Battelle Frankfurt containment loading experiments. The intercompartment flow rates incorporate an effective discharge coefficient and liquid droplet carryover fraction given by expressions of Schwan determined from analyses of the Battelle Frankfurt and Marviken tests. 5 refs., 4 figs

  8. Shut-down margin study for the next generation VVER-1000 reactor including 13 x 13 hexagonal annular assemblies

    International Nuclear Information System (INIS)

    Faghihi, Farshad; Mirvakili, S. Mohammad

    2011-01-01

    Highlights: → Shut-Down Margin (SDM) for the next generation annular fuel core of typical VVER-1000, 13 x 13 assemblies are calculated. → The MCNP-5 code is run for many cases with different core burn up at various core temperatures. → There is a substantial drop in SDM in the case of annular fuel for the same power level. → SDM for our proposed VVER-1000 annular pins is calculated for specific average fuel burn up values at the BOC, MOC, and EOC. - Abstract: Shut-Down Margin (SDM) for the next generation annular fuel core of typical VVER-1000, 13 x 13 assemblies are calculated as the main aim of the present research. We have applied the MCNP-5 code for many cases with different values of core burn up at various core temperatures, and therefore their corresponding coolant densities and boric acid concentrations. There is a substantial drop in SDM in the case of annular fuel for the same power level. Specifically, SDM for our proposed VVER-1000 annular pins is calculated when the average fuel burn up values at the BOC, MOC, and EOC are 0.531, 11.5, and 43 MW-days/kg-U, respectively.

  9. Shaping of the axial power density distribution in the core to minimize the vapor volume fraction at the outlet of the VVER-1200 fuel assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Savander, V. I.; Shumskiy, B. E., E-mail: borisshumskij@yandex.ru [National Research Nuclear University MEPhI (Russian Federation); Pinegin, A. A. [National Research Center Kurchatov Institute (Russian Federation)

    2016-12-15

    The possibility of decreasing the vapor fraction at the VVER-1200 fuel assembly outlet by shaping the axial power density field is considered. The power density field was shaped by axial redistribution of the concentration of the burnable gadolinium poison in the Gd-containing fuel rods. The mathematical modeling of the VVER-1200 core was performed using the NOSTRA computer code.

  10. Comparison of hydrogen generation for TVSM and TVSA fuel assemblies for water water energy reactor (VVER)-1000

    International Nuclear Information System (INIS)

    Stefanova, A.E.; Groudev, P.P.; Atanasova, B.P.

    2009-01-01

    This paper presents the results received during investigation of hydrogen generation for both types fuel assemblies-the old modernistic type of fuel assemblies (TVSM) and recently installed new one alternative type of fuel assemblies (TVSA) in case of severe accident. There are some differences between both types FAs. They have different geometry as well as different burnable poisons. To investigate behavior of new fuel assemblies during the severe conditions it have been performed comparison of fuel behavior of old type TVSM fuel assembly to new one TVSA. To perform this investigation it has been used MELCOR 'input model' for Kozloduy Nuclear Power Plant (KNPP) VVER 1000. The model was developed by Institute for Nuclear Research and Nuclear Energy-Bulgarian Academy of Sciences (INRNE-BAS) for investigation of severe accident scenarios and Probabilistic Safety Analyses (PSA) level 2. The model provides a significant analytical capability for the Bulgarian technical specialists, working in the field of the NPP safety, for analysis of core and containment damaged states and the estimation of radionuclides release outside fuel cladding. It was accepted criteria for vessel integrity about hydrogen concentration to be 8%. This criterion was based on the decision of RSK (Germany commission for reactor safety). Generally based on the received results it was made conclusion that using both types of fuel assemblies it was not disturbance safety conditions of NPP

  11. Analysis of core damage frequency: Nuclear power plant Dukovany, VVER/440 V-213 Unit 1, internal events. Volume 1: Main report

    International Nuclear Information System (INIS)

    Pugila, W.J.

    1994-01-01

    This report presents the final results from the Level 1 probabilistic safety assessment (PSA) for the Dukovany VVER/440 V-213 nuclear power plant, Unit 1. Section 1.1 describes the objectives of this study. Section 1.2 discusses the approach that was used for completing the Dukovany PSA. Section 1.3 summarizes the results of the PSA. Section 1.4 provides a comparison of the results of the Dukovany PSA with the results of other PSAs for different types of reactors worldwide. Section 1.5 summarizes the conclusions of the Dukovany PSA

  12. Adoption of in-vessel retention concept for VVER-440/V213 reactors in Central European Countries

    Energy Technology Data Exchange (ETDEWEB)

    Matejovic, Peter, E-mail: peter.matejovic@ivstt.sk [Inzinierska Vypoctova Spolocnost (IVS), Jana Holleho 5, 91701 Trnava (Slovakia); Barnak, Miroslav; Bachraty, Milan; Vranka, Lubomir [Inzinierska Vypoctova Spolocnost (IVS), Jana Holleho 5, 91701 Trnava (Slovakia); Berky, Robert [Integrita a Bezpecnost Ocelovych Konstrukcii, Rybnicna 40, 831 07 Bratislava (Slovakia)

    2017-04-01

    Highlights: • Design of in-vessel retention concept for VVER-440/V213 reactors. • Thermal loads acting on the inner reactor surface. • Structural response of reactor pressure vessel. • External reactor vessel cooling. - Abstract: An in-vessel retention (IVR) concept was proposed for standard VVER-440/V213 reactors equipped with confinement made of reinforced concrete and bubbler condenser pressure suppression system. This IVR concept is based on simple modifications of existing plant technology and thus it was attractive for plant operators in Central European Countries. Contrary to the solution that was adopted before at Loviisa NPP in Finland (two units of VVER-440/V213 reactor with steel confinement equipped with ice condenser), the coolant access to the reactor pressure vessel from flooded cavity is enabled via closable hole installed in the centre of thermal shield of the reactor lower head instead of lowering this massive structure in the case of severe accident. As a consequence, the crucial point of this IVR concept is narrow gap between torispherical lower head and thermal and biological shield. Here the highest thermal flux is expected in the case of severe accident. Thus, realistic estimation of thermal load and corresponding deformations of reactor wall and their impact on gap width for coolant flow are of primarily importance. In this contribution the attention is paid especially to the analytical support with emphasis to the following points: 1) {sup ∗}Estimation of thermal loads acting on the inner reactor surface; 2) {sup ∗}Estimation of structural response of reactor pressure vessel (RPV) with emphasis on the deformation of outer reactor surface and its impact on the annular gap between RPV wall and thermal/biological shield; 3) {sup ∗}Analysis of external reactor vessel cooling. For this purpose the ASTEC code was used for performing analysis of core degradation scenarios, the ANSYS code for structural analysis of reactor vessel

  13. Reactor power control device

    International Nuclear Information System (INIS)

    Ishii, Yoshihiko; Arita, Setsuo; Miyamoto, Yoshiyuki; Fukazawa, Yukihisa; Ishii, Kazuhiko

    1998-01-01

    The present invention provides a reactor power control device capable of enhancing an operation efficiency while keeping high reliability and safety in a BWR type nuclear power plant. Namely, the device of the present invention comprises (1) a means for inputting a set value of a generator power and a set value of a reactor power, (2) a means for controlling the reactor power to either smaller one of the reactor power corresponding to the set value of the generator power and the set value of the reactor power. With such procedures, even if the nuclear power plant is set so as to operate it to make the reactor power 100%, when the generator power reaches the upper limit, the reactor power is controlled with a preference given to the upper limit value of the generator power. Accordingly, safety and reliability are not deteriorated. The operation efficiency of the plant can be improved. (I.S.)

  14. Design and neutronic investigation of the Nano fluids application to VVER-1000 nuclear reactor with dual cooled annular fuel

    International Nuclear Information System (INIS)

    Ansarifar, G.R.; Ebrahimian, M.

    2016-01-01

    Highlights: • The change in neutronic parameters to the use of nanofluid as coolant is presented. • Nanoparticle deposition on fuel clad is investigated. • Radial and axial local power peaking factors are presented. • ZrO 2 and Al 2 O 3 have the lowest rate of K eff drop off. - Abstract: Nowadays, many efforts have been made to improve the efficiency of nuclear power plants. One of which is use of the dual cooled annular fuel which is an internally and externally cooled annular fuel with many advantages in heat transfer characteristics. Another is the use of nanoparticle/water (nanofluid) as coolant. In this paper, by combining these two methods, the change in neutronic parameters of the VVER-1000 nuclear reactor core with dual cooled annular fuel attributable to the use of nanoparticle/water (nanofluid) as coolant is presented. Optimization of type and volume fraction of nanoparticles in water that affect the safety enhancement of core primary parameters is intended in this study. Reactivity change, radial and axial local power peaking factors (LPPF), and the consequence of nanoparticle deposition on fuel clad are investigated. As a result of changing the effective multiplication factor and PPF calculations for six types of nanoparticles which have been studied extensively for their heat transfer properties including Alumina, Aluminum, Copper oxide, Copper, Titania, and Zirconia with different volume fractions, it can be concluded that at low concentration (0.03 volume fraction), Zirconia and Alumina are the optimum nanoparticles for normal operation. The maximum radial and axial PPF are found to be invariant to the type of nanofluid at low volume fractions. With an increase in nanoparticle deposition thickness on the outer and inner clad, a flux and K eff depression occurred and ZrO 2 and Al 2 O 3 have the lowest rate of drop off.

  15. Increased SRP reactor power

    International Nuclear Information System (INIS)

    MacAfee, I.M.

    1983-01-01

    Major changes in the current reactor hydraulic systems could be made to achieve a total of about 1500 MW increase of reactor power for P, K, and C reactors. The changes would be to install new, larger heat exchangers in the reactor buildings to increase heat transfer area about 24%, to increase H 2 O flow about 30% per reactor, to increase D 2 O flow 15 to 18% per reactor, and increase reactor blanket gas pressure from 5 psig to 10 psig. The increased reactor power is possible because of reduced inlet temperature of reactor coolant, increased heat removal capacity, and increased operating pressure (larger margin from boiling). The 23% reactor power increase, after adjustment for increased off-line time for reactor reloading, will provide a 15% increase of production from P, K, and C reactors. Restart of L Reactor would increase SRP production 33%

  16. Generation of multigroup cross-sections from micro-group ones in code system SUHAM-U used for VVER-1000 reactor core calculations with MOX loading

    Energy Technology Data Exchange (ETDEWEB)

    Boyarinov, V.F.; Davidenko, V.D.; Polismakov, A.A.; Tsybulsky, V.F. [RRC Kurchatov Institute, Moscow (Russian Federation)

    2005-07-01

    At the present time, the new code system SUHAM-U for calculation of the neutron-physical processes in nuclear reactor core with triangular and square lattices based both on the modern micro-group (about 7000 groups) cross-sections library of code system UNK and on solving the multigroup (up to 89 groups) neutron transport equation by Surface Harmonics Method is elaborated. In this paper the procedure for generation of multigroup cross-sections from micro-group ones for calculation of VVER-1000 reactor core with MOX loading is described. The validation has consisted in computing VVER-1000 fuel assemblies with uranium and MOX fuel and has shown enough high accuracy under corresponding selection of the number and boundaries of the energy groups. This work has been fulfilled in the frame of ISTC project 'System Analyses of Nuclear Safety for VVER Reactors with MOX Fuels'.

  17. Fast Neutron Transport in the Biological Shielding Model and Other Regions of the VVER-1000 Mock-Up on the LR-0 Research Reactor

    Directory of Open Access Journals (Sweden)

    Košťál Michal

    2016-01-01

    Full Text Available A set of benchmark experiments was carried out in the full scale VVER-1000 mock-up on the reactor LR-0 in order to validate neutron transport calculation methodologies and to perform the optimization of the shape and locations of neutron flux operation monitors channels inside the shielding of the new VVER-1000 type reactors. Compared with previous experiments on the VVER-1000 mock-up on the reactor LR-0, the fast neutron spectra were measured in the extended neutron energy interval (0.1–10 MeV and new calculations were carried out with the MCNPX code using various nuclear data libraries (ENDF/B VII.0, JEFF 3.1, JENDL 3.3, JENDL 4, ROSFOND 2009, and CENDL 3.1. Measurements and calculations were carried out at different points in the mock-up. The calculation and experimental data are compared.

  18. Vver-1000 Mox core computational benchmark

    International Nuclear Information System (INIS)

    2006-01-01

    The NEA Nuclear Science Committee has established an Expert Group that deals with the status and trends of reactor physics, fuel performance and fuel cycle issues related to disposing of weapons-grade plutonium in mixed-oxide fuel. The objectives of the group are to provide NEA member countries with up-to-date information on, and to develop consensus regarding, core and fuel cycle issues associated with burning weapons-grade plutonium in thermal water reactors (PWR, BWR, VVER-1000, CANDU) and fast reactors (BN-600). These issues concern core physics, fuel performance and reliability, and the capability and flexibility of thermal water reactors and fast reactors to dispose of weapons-grade plutonium in standard fuel cycles. The activities of the NEA Expert Group on Reactor-based Plutonium Disposition are carried out in close co-operation (jointly, in most cases) with the NEA Working Party on Scientific Issues in Reactor Systems (WPRS). A prominent part of these activities include benchmark studies. At the time of preparation of this report, the following benchmarks were completed or in progress: VENUS-2 MOX Core Benchmarks: carried out jointly with the WPRS (formerly the WPPR) (completed); VVER-1000 LEU and MOX Benchmark (completed); KRITZ-2 Benchmarks: carried out jointly with the WPRS (formerly the WPPR) (completed); Hollow and Solid MOX Fuel Behaviour Benchmark (completed); PRIMO MOX Fuel Performance Benchmark (ongoing); VENUS-2 MOX-fuelled Reactor Dosimetry Calculation (ongoing); VVER-1000 In-core Self-powered Neutron Detector Calculational Benchmark (started); MOX Fuel Rod Behaviour in Fast Power Pulse Conditions (started); Benchmark on the VENUS Plutonium Recycling Experiments Configuration 7 (started). This report describes the detailed results of the benchmark investigating the physics of a whole VVER-1000 reactor core using two-thirds low-enriched uranium (LEU) and one-third MOX fuel. It contributes to the computer code certification process and to the

  19. Comparisons with measured data of the simulated local core parameters by the coupled code ATHLET-BIPR-VVER applying a new enhanced model of the reactor pressure vessel

    International Nuclear Information System (INIS)

    Nikonov, S.; Pasichnyk, I.; Velkov, K.; Pautz, A.

    2011-01-01

    The paper describes the performed comparisons of measured and simulated local core data based on the OECD/NEA Benchmark on Kalinin-3 NPP: 'Switching off of one of the four operating main circulation pumps at nominal reactor power'. The local measurements of in core self-powered neutron detectors (SPND) in 64 fuel assemblies on 7 axial levels are used for the comparisons of the assemblies axial power distributions and the thermocouples readings at 93 fuel assembly heads are applied for the fuel assembly coolant temperature comparisons. The analyses are done on the base of benchmark transient calculations performed with the coupled system code ATHLET/BIPR-VVER. In order to describe more realistically the fluid mixing phenomena in a reactor pressure vessel a new enhanced nodalization scheme is being developed. It could take into account asymmetric flow behaviour in the reactor pressure vessel structures like downcomer, reactor core inlet and outlet, control rods' guided tubes, support grids etc. For this purpose details of the core geometry are modelled. About 58000 control volumes and junctions are applied. Cross connection are used to describe the interaction between the fluid objects. The performed comparisons are of great interest because they show some advantages by performing coupled code production pseudo-3D analysis of NPPs applying the parallel thermo-hydraulic channel methodology (or 1D thermo-hydraulic system code modeling). (Authors)

  20. Technology of repair of selected equipment in the power plant type VVER 440

    Energy Technology Data Exchange (ETDEWEB)

    Barborka, J.; Magula, V. [Welding Research Inst. (WRI), Bratislava (Slovakia)

    1998-11-01

    This article is divided in two parts: The first part is studying the effect of individual parameters by the usual and pulsed welding of 15CH2MFA steel. It can be concluded that by use of mechanized or automatic TIG process in PC position with addition of a cold wire with high nickel content the desired quality of repair welded joints of a pressure vessel of VVER 440 reactor can be achieved. Based on the results of the second laboratory study of the renovation technology applied for the rotary surfaces of pressure-tight cover and spindle of the main closing armature type DN 500 it can be concluded, that the developed technology for surfacing the sealing surfaces by TIG process with addition of a high-nickel cold wire the functional capability of the mentioned parts can be fully restored.

  1. Technology of repair of selected equipment in the power plant type VVER 440

    International Nuclear Information System (INIS)

    Barborka, J.; Magula, V.

    1998-01-01

    This article is divided in two parts: The first part is studying the effect of individual parameters by the usual and pulsed welding of 15CH2MFA steel. It can be concluded that by use of mechanized or automatic TIG process in PC position with addition of a cold wire with high nickel content the desired quality of repair welded joints of a pressure vessel of VVER 440 reactor can be achieved. Based on the results of the second laboratory study of the renovation technology applied for the rotary surfaces of pressure-tight cover and spindle of the main closing armature type DN 500 it can be concluded, that the developed technology for surfacing the sealing surfaces by TIG process with addition of a high-nickel cold wire the functional capability of the mentioned parts can be fully restored

  2. Guide to power reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1959-07-15

    The IAEA's major first scientific publication is the Directory of Power Reactors now in operation or under construction in various parts of the world. The purpose of the directory is to present important details of various power projects in such a way as to provide a source of easy reference for anyone interested in the development of the peaceful uses of atomic energy, either at the technical or management level. Six pages have been devoted to each reactor the first of which contains general information, reactor physics data and information about the core. The second and third contain sketches of the fuel element or of the fuel element assembly, and of the horizontal and vertical sections of the reactor. On the fourth page information is grouped under the following heads: fuel element, core heat transfer, control, reactor vessel and over-all dimensions, and fluid flow. The fifth page shows a simplified flow diagram, while the sixth provides information on reflector and shielding, containment and turbo generator. Some information has also been given, when available, on cost estimates and operating staff requirements. Remarks and a bibliography constitute the last part of the description of each reactor. Reactor projects included in this directory are pressurized light water cooled power reactors. Boiling light water cooled power reactors, heavy water cooled power reactors, gas cooled power reactors, organic cooled power reactors liquid metal cooled power reactors and liquid metal cooled power reactors

  3. 3D neutronic codes coupled with thermal-hydraulic system codes for PWR, and BWR and VVER reactors

    Energy Technology Data Exchange (ETDEWEB)

    Langenbuch, S.; Velkov, K. [GRS, Garching (Germany); Lizorkin, M. [Kurchatov-Institute, Moscow (Russian Federation)] [and others

    1997-07-01

    This paper describes the objectives of code development for coupling 3D neutronics codes with thermal-hydraulic system codes. The present status of coupling ATHLET with three 3D neutronics codes for VVER- and LWR-reactors is presented. After describing the basic features of the 3D neutronic codes BIPR-8 from Kurchatov-Institute, DYN3D from Research Center Rossendorf and QUABOX/CUBBOX from GRS, first applications of coupled codes for different transient and accident scenarios are presented. The need of further investigations is discussed.

  4. Thermal-hydraulic modeling of nanofluids as the coolant in VVER-1000 reactor core by the porous media approach

    International Nuclear Information System (INIS)

    Jahanfarnia, G.; Zarifi, E.; Veysi, F.

    2013-01-01

    The aim of this study was to perform a thermal-hydraulic analysis of nanofluids as coolant in the Bushehr VVER-1000 reactor core using the porous media approach. Water-based nanofluids containing various volume fractions of Al 2 O 3 and TiO 2 nanoparticles were analyzed. The conservation equations were discretized by the finite volume method and solved by numerical methods. To validate the approaches applied in this study, the results of the model and COBRA-EN code were compared for pure water. The achieved results show that the temperature of the coolant increases with the concentration of the nanoparticles. (authors)

  5. The U.S.-Russian joint studies on using power reactors to disposition surplus weapons plutonium as spent fuel

    International Nuclear Information System (INIS)

    Chebeskov, A.; Kalashnikov, A.; Pavlovichev, A.

    1997-09-01

    In 1996, the US and the Russian Federation completed an initial joint study of the candidate options for the disposition of surplus weapons plutonium in both countries. The options included long term storage, immobilization of the plutonium in glass or ceramic for geologic disposal, and the conversion of weapons plutonium to spent fuel in power reactors. For the latter option, the US is only considering the use of existing light water reactors (LWRs) with no new reactor construction for plutonium disposition, or the use of Canadian deuterium uranium (CANDU) heavy water reactors. While Russia advocates building new reactors, the cost is high, and the continuing joint study of the Russian options is considering only the use of existing VVER-1000 LWRs in Russia and possibly Ukraine, the existing BN-60O fast neutron reactor at the Beloyarsk Nuclear Power Plant in Russia, or the use of the Canadian CANDU reactors. Six of the seven existing VVER-1000 reactors in Russia and the eleven VVER-1000 reactors in Ukraine are all of recent vintage and can be converted to use partial MOX cores. These existing VVER-1000 reactors are capable of converting almost 300 kg of surplus weapons plutonium to spent fuel each year with minimum nuclear power plant modifications. Higher core loads may be achievable in future years

  6. Modernization of Cross Section Library for VVER-1000 Type Reactors Internals and Pressure Vessel Dosimetry

    Directory of Open Access Journals (Sweden)

    Voloschenko Andrey

    2016-01-01

    Full Text Available The broad-group library BGL1000_B7 for neutron and gamma transport calculations in VVER-1000 internals, RPV and shielding was carried out on a base of fine-group library v7-200n47g from SCALE-6 system. The comparison of the library BGL1000_B7 with the library v7-200n47g and the library BGL1000 (the latter is using for VVER-1000 calculations is demonstrated on several calculation and experimental tests.

  7. Reactor power measuring device

    International Nuclear Information System (INIS)

    Izumi, Mikio; Sano, Yuji; Seki, Eiji; Yoshida, Toshifumi; Ito, Toshiaki.

    1993-01-01

    The present invention provides a self-powered long detector having a sensitivity over the entire length of a reactor core as an entire control rod withdrawal range of a BWR type reactor, and a reactor power measuring device using a gamma ray thermometer which scarcely causes sensitivity degradation. That is, a hollow protection pipe is disposed passing through the reactor core from the outside of a reactor pressure vessel. The self-powered long detectors and the gamma ray thermometers are inserted and installed in the protection pipe. An average reactor power in an axial direction of the reactor relative to a certain position in the horizontal cross section of the reactor core is determined based on the power of the self-powered long detector over the entire length of the reactor core. Since the response of the self-powered detector relative to a local power change is rapid, the output is used as an input signal to a safety protection device of the reactor core. Further, a gamma ray thermometer secured in the reactor and having scarce sensitivity degradation is used instead of an incore travelling neutron monitor used for relative calibration of an existent neutron monitor secured in the reactor. (I.S.)

  8. Experimental support of the bleed and feed accident management measures for VVER-440/213 type reactors

    International Nuclear Information System (INIS)

    Szabados, L.

    2002-01-01

    In the original design of the VVER-440/213 type nuclear power plants event oriented emergency operating procedures (EOP) were implemented. In the last years, however, new symptom based procedures of Westinghouse-type have been developed and partly implemented for the plants in Central Europe including the Paks Nuclear Power Plant. Paper gives a short review of the experiments performed in the PMK-2 facility to study the effectiveness of the bleed and feed strategies and to get experimental data bases for the validation of thermohydraulic system codes like RELAP5, ATHLET and CATHARE.(author)

  9. Analyses of SBO sequence of VVER1000 reactor using TRACE and MELCOR codes

    International Nuclear Information System (INIS)

    Mazzini, Guido; Kyncl, Milos; Miglierini, Bruno; Kopecek, Vit

    2015-01-01

    In response to the Fukushima accident, the European Commission ordered to perform stress tests to all European Nuclear Power Plants (NPPs). Due to shortage of time a number of conclusions in national stress tests reports were based on engineering judgment only. In the Czech Republic, as a follow up, a consortium of Research Organizations and Universities has decided to simulate selected stress tests scenarios, in particular station Black-Out (SBO) and Loss of Ultimate Sink (LoUS), with the aim to verify conclusions made in the national stress report and to analyse time response of respective source term releases. These activities are carried out in the frame of the project 'Prevention, preparedness and mitigation of consequences of Severe Accident (SA) at Czech NPPs in relation to lessons learned from stress tests after Fukushima' financed by the Ministry of Interior. The Research Centre Rez has been working on the preparation of a MELCOR model for VVER1000 NPP starting with a plant systems nodalization. The basic idea of this paper is to benchmark the MELCOR model with the validated TRACE model, first comparing the steady state and continuing in a long term SBO plus another event until the beginning of the severe accident. The presented work focuses mainly on the preliminary comparison of the thermo-hydraulics of the two models created in MELCOR and TRACE codes. After that, preliminary general results of the SA progression showing the hydrogen production and the relocation phenomena will be shortly discussed. This scenario is considered closed after some seconds to the break of the lower head. (author)

  10. A phenomenological method of mechanical properties definition of reactor pressure vessels (RPV) steels VVER according to the ball indentation diagram

    International Nuclear Information System (INIS)

    Bakirov, M. B.; Potapov, V.V.; Massoud, J.P.

    2002-01-01

    This work presents specimen-free methods of a standard uniaxial tension diagram construction and RPV (reactor pressure vessel) steels VVER strength properties definition out of a continuous ball indentation diagram. A similarity phenomenon of uniaxial tension strain curves at a hardening area and an area of a ball indentation constitutes the ground of the methods. The methods are developed on the basis of the uniform graphic representation of elasto-plastic strain processes by indentation and tension and with the reception of the unified yield curve at a hardening area. The calculation results on the phenomenological method conducted for a wide range of RPV steels conditions of nuclear reactors have shown a good precision as far as strain curves construction by the uniaxial tension out of the elasto-plastic indentation diagram is concerned. (authors)

  11. Dosimetry of VVER-1000 Reactor Pressure Vessel and Surveillance Specimens as a part of PLiM at Ukrainian NPPs

    International Nuclear Information System (INIS)

    Bukanov, V.N.; Diemokhin, V.L.; Grytsenko, O.V.; Ilkovych, V.V.; Pugach, A.M.; Pugach, S.M.; Vasylieva, O.G.; Vyshnevskyi, I.M.; Kasatkin, O.G.

    2012-01-01

    A regular surveillance program for VVER-1000 and its shortages are described. The Methodology for determination of neutron flux functionals on surveillance specimens of VVER-1000 pressure vessel is presented. The radiation exposure monitoring system for VVER-1000 pressure vessel is described. The main principles of an additional surveillance program for VVER-1000 are presented. The Dosimetry Experiment, which is already carrying out at Unit 3 of Rivne NPP, is described. (author)

  12. Experience on KKNPP VVER 1000 MWe water chemistry

    International Nuclear Information System (INIS)

    Ganesh, S.; Selvaraj, S.; Balasubramanian, M.R.; Selvavinayagam, P.; Pillai, Suresh Kumar

    2015-01-01

    Kudankulam Nuclear Power Project consists of pressurized water reactor (VVER) 2 x 1000 MWe constructed in collaboration with Russian Federation at Kudankulam in Tirunelveli District, Tamilnadu. Unit - 1 attained criticality on July 13 th 2013 and the unit was synchronized to grid on 22 nd October 2013. This paper highlights experience gained on water chemistry regime for primary and secondary circuit. (author)

  13. Reactor power monitoring device

    International Nuclear Information System (INIS)

    Dogen, Ayumi; Ozawa, Michihiro.

    1983-01-01

    Purpose: To significantly improve the working efficiency of a nuclear reactor by reflecting the control rod history effect on thermal variants required for the monitoring of the reactor operation. Constitution: An incore power distribution calculation section reads the incore neutron fluxes detected by neutron detectors disposed in the reactor to calculate the incore power distribution. A burnup degree distribution calculation section calculates the burnup degree distribution in the reactor based on the thus calculated incore power distribution. A control rod history date store device supplied with the burnup degree distribution renews the stored control rod history data based on the present control rod pattern and the burnup degree distribution. Then, thermal variants of the nuclear reactor are calculated based on the thus renewed control rod history data. Since the control rod history effect is reflected on the thermal variants required for the monitoring of the reactor operation, the working efficiency of the nuclear reactor can be improved significantly. (Seki, T.)

  14. Effectiveness of the neutron-shield nanocomposites for a dual-purpose cask of Bushehr's Water–Water Energetic Reactor (VVER 1000 nuclear-power-plant spent fuels

    Directory of Open Access Journals (Sweden)

    Mahdi Rezaeian

    2017-10-01

    Full Text Available In order to perform dry interim storage and transportation of the spent-fuel assemblies of the Bushehr Nuclear Power Plant, dual-purpose casks can be utilized. The effectiveness of different neutron-shield materials for the dual-purpose cask was analyzed through a set of calculations carried out using the Monte Carlo N-Particle (MCNP code. The dose rate for the dual-purpose cask utilizing the recently developed materials of epoxy/clay/B4C and epoxy/clay/B4C/carbon fiber was less than the allowable radiation level of 2 mSv/h at any point and 0.1 mSv/h at 2 m from the external surface of the cask. By utilization of epoxy/clay/B4C instead of an ethylene glycol/water mixture, the dose rates on the side surface of the cask due to neutron sources and consequent secondary gamma rays will be reduced by 17.5% and 10%, respectively. The overall dose rate in this case will be reduced by 11%.

  15. A study of the effects of changing burn-up and gap gaseous compound on the gap convection coefficient (in a hot fuel pin) in VVER-1000 reactor

    International Nuclear Information System (INIS)

    Rahgoshay, M.; Rahmani, Y.

    2007-01-01

    In this article we worked on the result and process of calculation of the gap heat transfer coefficient for a hot fuel pin in accordance with burn-up changes in the VVER-1000 reactor at the Bushehr nuclear power plant (Iran). With regard to the fact that in calculating the fuel gap heat transfer coefficient, various parameters are effective and the need for designing a model is being felt, therefore, in this article we used Ross and Stoute gap model to study impacts of different effective parameters such as thermal expansion and gaseous fission products on the h gap change rate. Over time and with changes in fuel burn-up some gaseous fission products such as xenon, argon and krypton gases are released to the gas mixture in the gap, which originally contained helium. In this study, the composition of gaseous elements in the gap volume during different times of reactor operation was found using ORIGEN code. Considering that the thermal conduction of these gases is lower than that of helium, and by using the Ross and Stoute gap model, we find first that the changes in gaseous compounds in the gap reduce the values of gap thermal conductivity coefficient, but considering thermal expansion (due to burn-up alterations) of fuel and clad resulting in the reduction of gap thickness we find that the gap heat transfer coefficient will augment in a broad range of burn-up changes. These changes result in a higher rate of gap thickness reduction than the low rate of decrease of heat conduction coefficient of the gas in the gap during burn-up. Once these changes have been defined, we can proceed with the analysis of the results of calculations based on the Ross and Stoute model and compare the results obtained with the experimental results for a hot fuel pin as presented in the final safety analysis report of the VVER-1000 reactor at Bushehr. It is noteworthy that the results of accomplished calculations based on the Ross and Stoute model correspond well with the existing

  16. Reactor power control device

    International Nuclear Information System (INIS)

    Doi, Kazuyori.

    1981-01-01

    Purpose: To automatically control the BWR type reactor power by simple and short-time searching the load pattern nearest to the required pattern at a nuclear power plant side. Constitution: The reactor power is automatically regulated by periodical modifying of coefficients fitting to a reactor core model, according as a required load pattern. When a load requirement pattern is given, a simulator estimates the total power change and the axial power distribution change from a xenon density change output calculated by a xenon dynamic characteristic estimating device, and a load pattern capable of being realized is searched. The amount to be recirculated is controlled on the basis of the load patteren thus searched, and the operation of the BWR type reactor is automatically controlled at the side of the nuclear power plant. (Kamimura, M.)

  17. Reactor power distribution monitor

    International Nuclear Information System (INIS)

    Hoizumi, Atsushi.

    1986-01-01

    Purpose: To grasp the margin for the limit value of the power distribution peaking factor inside the reactor under operation by using the reactor power distribution monitor. Constitution: The monitor is composed of the 'constant' file, (to store in-reactor power distributions obtained from analysis), TIP and thermocouple, lateral output distribution calibrating apparatus, axial output distribution synthesizer and peaking factor synthesizer. The lateral output distribution calibrating apparatus is used to make calibration by comparing the power distribution obtained from the thermocouples to the power distribution obtained from the TIP, and then to provide the power distribution lateral peaking factors. The axial output distribution synthesizer provides the power distribution axial peaking factors in accordance with the signals from the out-pile neutron flux detector. These axial and lateral power peaking factors are synthesized with high precision in the three-dimensional format and can be monitored at any time. (Kamimura, M.)

  18. Calculation of the fuel composition and the thermo-neutronic parameters of the Bushehr’s VVER-1000 reactor during the initial startup and the first cycle using the WIMSD5-B, CITATION-LDI2 and WERL codes

    International Nuclear Information System (INIS)

    Rahmani, Yashar; Pazirandeh, Ali; Ghofrani, Mohammad B.; Sadighi, Mostafa

    2013-01-01

    Highlights: ► In this paper, the changes of the thermo-neutronic parameters of a VVER 1000 reactor were studied during the first cycle. ► The coupling of neutronic and thermo-hydraulic codes was utilized. ► A computational program (WERL code) was designed to calculate the temperature distribution of the reactor core. ► To estimate the concentration of the released gaseous fission products, the Weisman model was used. ► The results of this study enjoyed the desirable accuracy. - Abstract: In this paper, the concentrations of fission products and fuel isotopes as well as the changes of the thermo-neutronic parameters of the Bushehr’s VVER-1000 reactor were studied during the initial startup and the first cycle. In order to perform the time-dependent cell calculations and obtain the concentration of fuel elements, the WIMSD5-B code was used. Besides, by utilizing the CITATION-LDI2 code, the effective multiplication factor and the thermal power distribution of the reactor were calculated. A computer program (WERL code) was designed in order to perform accurate calculation of the temperature distribution of the reactor core. For this purpose, the Ross–Stoute, Weisman, and Lee–Kesler models were used for calculating of the gap conductance coefficient, fission gas release and gap pressure, respectively. The results demonstrated that in designing the startup process, in addition to the role considered for overcoming the power defects and in preparing the required conditions for performing the safety-assurance tests, the flattening of the reactor’s power must be taken into account. Comparison between the results of this modeling and the final safety analysis report of this reactor showed that the results presented in this paper are satisfactorily accurate

  19. Reactor power control system

    International Nuclear Information System (INIS)

    Tomisawa, Teruaki.

    1981-01-01

    Purpose: To restore reactor-power condition in a minimum time after a termination of turbine bypass by reducing the throttling of the reactor power at the time of load-failure as low as possible. Constitution: The transient change of the internal pressure of condenser is continuously monitored. When a turbine is bypassed, a speed-control-command signal for a coolant recirculating pump is generated according as the internal pressure of the condenser. When the signal relating to the internal pressure of the condenser indicates insufficient power, a reactor-control-rod-drive signal is generated. (J.P.N.)

  20. Power reactors operational diagnosis

    International Nuclear Information System (INIS)

    Dach, K.; Pecinka, L.

    1976-01-01

    The definition of reactor operational diagnostics is presented and the fundamental trends of research are determined. The possible sources of power reactor malfunctions, the methods of defect detection, the data evaluation and the analysis of the results are discussed in detail. In view of scarcity of a theoretical basis and of insufficient in-core instrumentation, operational diagnostics cannot be as yet incorporated in a computer-aided reactor control system. (author)

  1. Probabilistic methods of optimization of scheduled tests for heat equipment of safety systems of reactor at full power

    International Nuclear Information System (INIS)

    Bilej, D.V.; Fridman, N.A.; Kolykhanov, V.N.; Skalozubov, V.I.

    2004-01-01

    This article generalises the basic results of a long-term teamwork with respect to a scientific and technical substantiation of perfection of the regulations of safe operation power units with VVER. This perfection is concerning a periodicity and volumes of tests of safety systems when a reactor works at full power. The article shows that the application of the probabilistic approaches connected to minimisation of a risk criterion function is an effective methodical base for the optimisation. For certain safety systems of serial power units with VVER 1000 the results of calculated substantiations are presented

  2. Primary water chemistry for NPP with VVER-TOI

    International Nuclear Information System (INIS)

    Susakin, S.N.; Brykov, S.I.; Zadonsky, N.V.; Bystrova, O.S.

    2012-09-01

    Nowadays within the framework of development of the nuclear power industry in Russia the VVER-TOI reactor is under designing (Standard optimized design). The given design provides for improvement of operation safety level, of technical-economic, operational and load-follow characteristics, and for the raise of competitive capacity of reactor plant and NPP as a whole. In VVER-TOI reactor plant design the primary water chemistry has been improved considering operation experience of VVER reactor plants and a possibility of RP operation under load-follow modes from the viewpoint of meeting the following requirements: - suppression of generation of oxidizing radiolytic products under power operation; - assurance of corrosion resistance of structural materials of equipment and pipelines throughout the NPP design service life; - minimization of deposits on surfaces of the reactor core fuel rods and on heat exchange surface of steam generators; - minimization of accumulation of activated corrosion products; - minimization of the amount of radioactive processing waste. In meeting these requirements an important role is devoted to suppression of generation of oxidizing radiolytic products owing to accumulation of hydrogen in the primary coolant. At NPP with VVER-1000 reactor the ammonia-potassium water chemistry is used wherein the hydrogen accumulation is provided at the expense of ammonia proportioning. Usage of ammonia leads to generation of additional amount of radioactive processing waste and to increased irregularity of maintaining the water chemistry under the daily load-follow modes. In VVER TOI design the primary water chemistry is improved by replacing the proportioning of ammonia with the proportioning of gaseous hydrogen. Different process schemes were considered that provide for a possibility of hydrogen accumulation and maintaining owing to direct proportioning of gaseous hydrogen. The obtained results showed that transition to the potassium water chemistry

  3. HOMOGENEOUS NUCLEAR POWER REACTOR

    Science.gov (United States)

    King, L.D.P.

    1959-09-01

    A homogeneous nuclear power reactor utilizing forced circulation of the liquid fuel is described. The reactor does not require fuel handling outside of the reactor vessel during any normal operation including complete shutdown to room temperature, the reactor being selfregulating under extreme operating conditions and controlled by the thermal expansion of the liquid fuel. The liquid fuel utilized is a uranium, phosphoric acid, and water solution which requires no gus exhaust system or independent gas recombining system, thereby eliminating the handling of radioiytic gas.

  4. Reactor power control device

    International Nuclear Information System (INIS)

    Kobayashi, Akira.

    1980-01-01

    Purpose: To prevent misoperation in a control system for the adjustment of core coolant flow rate, and the increase in the neutron flux density caused from the misoperation in BWR type reactors. Constitution: In a reactor power control system adapted to control the reactor power by the adjustment of core flow rate, average neutron flux signals of a reactor core, entire core flow rate signals and operation state signals for coolant recycling system are inputted to a microcomputer. The outputs from the computer are sent to a recycling MG set speed controller to control the reactor core flow rate. The computer calculates the change ratio with time in the average neutron flux signals, correlation between the average neutron flux signals and the entire core flow rate signals, change ratio with time in the operation state signals for the coolant recycling system and the like and judges the abnormality in the coolant recycling system based on the calculated results. (Ikeda, J.)

  5. Determination of the Effectiveness of Control Rods in the VVER Reactor Fuel Assemblies; Determination de l'Efficacite des Barres de Reglage dans les Ensembles Combustibles du reacteur VVER; Opredelenie ehffektivnosti reguliruyushchikh sterzhnej v sborkakh reaktora VVEHR; Determinacion de la Eficacia de las Barras de Control en los Conjuntos de Elementos Combustibles del Reactor VVER

    Energy Technology Data Exchange (ETDEWEB)

    Semenov, V. N.; Lunin, G. L.; Komissarov, L. V.; Kamyshan, A. N.; Halizev, V. I.; Andrianov, G. Ja.; Voznesenskij, V. A.; Kuz' micheva, V. A.; Lebedev, V. I. [Ordena Lenina Institut Atomnoj Energii Im. I.V. Kurchatova, Moskva, SSSR (Russian Federation)

    1964-06-15

    The paper describes experiments done in homogeneous mock-ups of the fuel assemblies from the VVER Reactor (at one level of enrichment) to determine the effectiveness of absorbing systems comprising shim fuel assemblies or water cavities and of absorbing rods clad in jackets made of differing materials. The paper also gives data on some experiments that have been done in mock-ups of assemblies with differing levels of enrichment. These experiments make it possible to verify the methods used in calculation and to evaluate the prospects of using them for heterogeneous reactors. (author) [French] Le memoire decrit les experiences qui ont ete faites pour determiner l 'efficacite des absorbants contenus dans les barres de compensation, l'effet cavitaire et l 'efficacite des absorbants gaines de materiaux divers, au moyen d'assemblages homogenes de cartouches de combustible du reacteur VVER (reacteur de puissance ralenti et refroidi a l 'eau ayant le meme taux d'enrichissement. On y trouve en outre des donnees sur certaines experiences executees a l 'aide d'assemblages de cartouches de combustible taux d'enrichissement differents. Ces travaux permettent de verifier la methode de calcul et d'evaluer ses possibilites d'application aux reacteurs non homogenes. (author) [Spanish] Se describen en la memoria experimentos para determinar la eficacia de los materiales absorbentes contenidos en las barras de compensacion, el efecto de cavitacion y la eficacia de los materiales absorbentes revestidos de diversos materiales, realizados con ayuda de los conjuntos homogeneos de elementos combustibles del reactor VVER (reactor de potencia moderado y refrigerado por agua) con un solo grado de enriquecimiento. Ademas, se exponen datos sobre los experimentos efectuados con ayuda de conjuntos de grados de enriquecimientos; variados. Tales experimentos permiten verificar el metodo de calculo teorico, utilizad o y evaluar la posibilidad de aplicarlo a los reactores no homogeneos. (author

  6. VVER fuel. Results of post irradiation examination

    International Nuclear Information System (INIS)

    Smirnov, V.P.; Markov, D.V.; Smirnov, A.V.; Polenok, V.S.; Perepelkin, S.O.; Ivashchenko, A.A.

    2005-01-01

    The present paper presents the main results of post-irradiation examination of more than 40 different fuel assemblies (FA) operated in the cores of VVER-1000 and VVER-440-type power reactors in a wide range of fuel burnup. The condition of fuel assembly components from the viewpoint of deformation, corrosion resistance and mechanical properties is described here. A serviceability of the FA design as a whole and interaction between individual FA components under vibration condition and mechanical load received primary emphasis. The reasons of FA damage fuel element failure in a wide range of fuel burnup are also analyzed. A possibility and ways of fuel burnup increase have been proved experimentally for the case of high-level serviceability maintenance of fuel elements to provide for advanced fuel cycles. (author)

  7. VVER-1000: considering its strengths and weaknesses

    International Nuclear Information System (INIS)

    Laaksonen, J.

    1994-01-01

    The safety of currently operating VVER-1000 reactors is examined. The factors considered are deviations in operation, inherent safety, safety system design, protection against internal and external hazards, equipment quality, the approach to plant operations and the safety culture. On the basis of this evaluation it is concluded that the overall safety of a VVER-1000 cannot be at the level of a modern Western PWR though there is no sound basis to make a quantitative comparison. Many of the concerns raised are being adequately addressed in the Czech Temelin which is currently under construction and in new designs which are still at the drawing board stage. Extensive back fitting programmes are planned or underway in operating plants. The creation of independent responsible operating organizations, powerful regulation and an improved economic situation are advanced as necessary criteria for real improvements in safety. (UK)

  8. Operating US power reactors

    International Nuclear Information System (INIS)

    Silver, E.G.

    1988-01-01

    This update, which appears regularly in each issue of Nuclear Safety, surveys the operations of those power reactors in the US which have been issued operating licenses. Table 1 shows the number of such reactors and their net capacities as of September 30, 1987, the end of the three-month period covered in this report. Table 2 lists the unit capacity and forced outage rate for each licensed reactor for each of the three months (July, August, and September 1987) covered in this report and the cumulative values of these parameters since the beginning of commercial operation. In addition to the tabular data, this article discusses other significant occurrences and developments that affected licensed US power reactors during this reporting period. Status changes at Braidwood Unit 1, Nine Mile Point 2, and Beaver Valley 2 are discussed. Other occurrences discussed are: retraining of control-room operators at Peach Bottom; a request for 25% power for Shoreham, problems at Fermi 2 which delayed the request to go to 75% power; the results of a safety study of the N Reactor at Hanford; a proposed merger of Pacific Gas and Electric with Sacramento Municipal Utility District which would result in the decommissioning of Rancho Seco; the ordered shutdown of Oyster Creek; a minor radioactivity release caused by a steam generator tube rupture at North Anna 1; and 13 fines levied by the NRC on reactor licensees

  9. Recent results of three-dimensional CFD simulations of coolant mixing in VVER-440/213 reactor pressure vessel

    International Nuclear Information System (INIS)

    Kiss, B.; Boros, I.; Aszodi, A.

    2008-01-01

    The Budapest University of Technology and Economics, Institute of Nuclear Techniques has been working since 2001 on the three-dimensional CFD model of the reactor pressure vessel of the VVER-440 type reactor. During this time period - due to the development of the available computational capacity - a very complex and detailed model of the RPV has been developed. The aim of the construction of the new model is to describe further internal structures of the RPV (e.g. correct modeling of brake tubes, or internals in the upper mixing chamber) and to perform an extensive sensitivity analysis on the different modeling and calculation parameters (e.g. porous region models vs. detailed modeling, or n different turbulence models). The new model can be applied for steady state calculation during normal operational condition and for different transient analyses as well. One interesting application is the participation in a planned benchmark exercise on the start-up of the sixth main coolant pump, which is aimed to compare the capabilities of mixing models of one-dimensional system codes with the results of CFD simulation. (authors)

  10. Compact power reactor

    International Nuclear Information System (INIS)

    Wetch, J.R.; Dieckamp, H.M.; Wilson, L.A.

    1978-01-01

    There is disclosed a small compact nuclear reactor operating in the epithermal neutron energy range for supplying power at remote locations, as for a satellite. The core contains fuel moderator elements of Zr hydride with 7 w/o of 93% enriched uranium alloy. The core has a radial beryllium reflector and is cooled by liquid metal coolant such as NaK. The reactor is controlled and shut down by moving portions of the reflector

  11. Reactor power control device

    International Nuclear Information System (INIS)

    Imaruoka, Hiromitsu.

    1994-01-01

    A high pressure water injection recycling system comprising injection pipelines of a high pressure water injection system and a flow rate control means in communication with a pool of a pressure control chamber is disposed to a feedwater system of a BWR type reactor. In addition, the flow rate control means is controlled by a power control device comprising a scram impossible transient event judging section, a required injection flow rate calculation section for high pressure water injection system and a control signal calculation section. Feed water flow rate to be supplied to the reactor is controlled upon occurrence of a scram impossible transient event of the reactor. The scram impossible transient event is judged based on reactor output signals and scram operation demand signals and injection flow rate is calculated based on a predetermined reactor water level, and condensate storage tank water or pressure control chamber pool water is injected to the reactor. With such procedures, water level can be ensured and power can be suppressed. Further, condensate storage tank water of low enthalpy is introduced to the pressure suppression chamber pool to directly control elevation of water temperature and ensure integrity of the pressure vessel and the reactor container. (N.H.)

  12. Power reactor design trends

    International Nuclear Information System (INIS)

    Hogan, W.J.

    1985-01-01

    Cascade and Pulse Star represent new trends in ICF power reactor design that have emerged in the last few years. The most recent embodiments of these two concepts, and that of the HYLIFE design with which they will compare them, are shown. All three reactors depend upon protecting structural elements from neutrons, x rays and debris by injecting massive amounts of shielding material inside the reaction chamber. However, Cascade and Pulse Star introduce new ideas to improve the economics, safety, and environmental impact of ICF reactors. They also pose different development issues and thus represent technological alternatives to HYLIFE

  13. The passive system for reflooding of the VVER reactor core from the second-stage hydro-accumulators: design and basic design solutions

    International Nuclear Information System (INIS)

    Alexandr D Efanov; Sergey G Kalyakin; Andrey V Morozov; Oleg V Remizov; Vladimir M Berkovich; Victor N Krushelnitskiy; Vladimir G Peresadko; Yuri G Dragunov; Alexey K Podshibyakin; Sergey I Zaitcev

    2005-01-01

    Full text of publication follows: The fundamental difference in the safety assurance of the operating NPPs and those under design implies that the safety in the existing NPPs is achieved by energy-dependent (active) systems and depends on the proficiency of attending personnel. To provide safety, the new NPP designs use the physical processes proceeding in the facility without power supply; and they are unaffected by human errors. As to the safety level, the design of the new generation nuclear power plant NPP-92 relates to the class of the improved NPPs; and it applies a principle of diversity in the structure of systems responsible for critical safety functions. In accordance with the above-mentioned safety concept, the design development required a complex of experimental investigations and numerical modeling to be conducted. Among the passive safety systems of the NPP with RP-392 is the system of the second stage hydro-accumulators (GE-2). The system of the second-stage hydro-accumulators consists of four groups of hydro-accumulating tanks with a total coolant volume of 960 m 3 . The system is intended for the core flooding with coolant during 24 hours. In each group of the hydro-accumulators, the graded coolant flowrate is provided, which depends on residual heat in the reactor. The special check valves are tuned to open at the pressure drop in the circuit below 1.5 MPa. The paper presents the thermalhydraulic substantiation of the serviceability of the second-stage hydro-accumulators system for passive heat removal from the VVER reactor core and the basic design solutions on the GE-2 system. (authors)

  14. Reactor power distribution monitor

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1980-01-01

    Purpose: To improve the performance and secure the safety of a nuclear reactor by rapidly computing and display the power density in the nuclear reactor by using a plurality of processors. Constitution: Plant data for a nuclear reactor containing the measured values from a local power monitor LPRM are sent and recorded in a magnetic disc. They are also sent to a core performance computer in which burn-up degree distribution and the like are computed, and the results are sent and recorded in the magnetic disc. A central processors loads programs to each of the processors and applies data recorded in the magnetic disc to each of the processors. Each of the processors computes the corresponding power distribution in four fuel assemblies surrounding the LPRM string by the above information. The central processor compiles the computation results and displays them on a display. In this way, power distribution in the fuel assemblies can rapidly be computed to thereby secure the improvement of the performance and safety of the reactor. (Seki, T.)

  15. Nuclear power reactor safety

    International Nuclear Information System (INIS)

    Pon, G.A.

    1976-10-01

    This report is based on the Atomic Energy of Canada Limited submission to the Royal Commission on Electric Power Planning on the safety of CANDU reactors. It discusses normal operating conditions, postulated accident conditions, and safety systems. The release of radioactivity under normal and accident conditions is compared to the limits set by the Atomic Energy Control Regulations. (author)

  16. Overview of VVER water chemistry

    International Nuclear Information System (INIS)

    Ganesh, S.; Selvaraj, S.; Balasubramanian, M.R.; Selvavinayagam, P.; Sundar, R.S.

    2007-01-01

    Kudankulam Nuclear Power project is having twin units of 1000MWe of VVER type. This paper highlights the different analytical techniques that are followed to maintain the system chemistry within the technical specifications. This paper also briefs the different chemicals that are added to the systems and how they are monitored. Basic differences with respect to chemistry between a PHWR and VVER are also highlighted in this paper. (author)

  17. Power reactor noise

    International Nuclear Information System (INIS)

    Thie, J.A.

    1981-01-01

    This book concentrates on the different types of noise present in power reactors and how the analysis of this noise can be used as a tool for reactor monitoring and diagnostics. Noise analysis is a growing field that offers advantages such as simplicity, low cost, and natural multivariable interactions. A major advantage, continuous and undisturbed monitoring, supplies a means of obtaining early warnings of possible reactor malfunctions thus preventing further complications by alerting operators to a problem - and aiding in the diagnosis of that problem - before it demands major repairs. Following an introductory chapter, the theoretical basis for the various methods of noise analysis is explained, and full chapters are devoted to the fundamentals of statistics for time-domain analysis and Fourier series and related topics for frequency-domain analysis. General experimental techniques and associated theoretical considerations are reviewed, leading to discussion of practical applications in the latter half of the book. Besides chapters giving examples of neutron noise and acoustical noise, chapters are also devoted to extensive examples from pressurized water reactor and boiling water reactor power plants

  18. High energy pipe line break postulations and their mitigation - examples for VVER nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Zdarek, J.; Pecinka, L.; Kadecka, P.; Dotrel, J. [Nuclear Res. Inst., Rez (Czech Republic)

    1998-11-01

    The concept and the proposals for the protection and reinforcement of equipment against the effects of postulated rupture of the high-energy piping, in VVER Plant, are presented. The most recent version of the US NRC Guidelines has been used. The development of the legislation, the basic approach and selection of criteria for the assessment of the rupture of high energy piping, provide the basis for the application of the separation concept in the overall safety philosophy. (orig.)

  19. High energy pipe line break postulations and their mitigation - examples for VVER nuclear power plants

    International Nuclear Information System (INIS)

    Zdarek, J.; Pecinka, L.; Kadecka, P.; Dotrel, J.

    1998-01-01

    The concept and the proposals for the protection and reinforcement of equipment against the effects of postulated rupture of the high-energy piping, in VVER Plant, are presented. The most recent version of the US NRC Guidelines has been used. The development of the legislation, the basic approach and selection of criteria for the assessment of the rupture of high energy piping, provide the basis for the application of the separation concept in the overall safety philosophy. (orig.)

  20. Control of selected VVER components life time SKODA JS a.s. experience

    International Nuclear Information System (INIS)

    Zdebor, J.; Pribulla, E.

    2005-01-01

    Experience from the operation of nuclear power plants with type VVER reactors has shown that the life time management of a number of nuclear reactor components is technically as well as with respect to safety substantiated even at the time which exceeds their originally designed life time. To accept such solution it was necessary to develop and implement a number of programs based on which it was possible to evaluate the actual condition of monitored equipment. It is a condition allowing to adopt solution concerning the possibility of their further operation. Experience from the manufacture of 21 sets of reactor equipment for VVER 440 and 3 sets VVER 1000 has been gathered in SKODA JS a.s. which have been completed by experience from service activities performed at operated nuclear power plants. Analyses of manufacturing data and in-service inspection results completed by a lot of laboratory tests have become the basis for the development of selected VVER components life time management programs. The paper focuses on the life time management of those VVER components which SKODA JS a.s. has most experience with. (authors)

  1. The experimental definition of the acoustic standing wave series shapes, formed in the coolant of the primary circuit of VVER-440 type reactor

    International Nuclear Information System (INIS)

    Bulavin, V.V.; Pavelko, V.I.

    1995-01-01

    On the basis of pressure fluctuation measurements in some primary circuit loops at 2 nd Unit of Kola NPP with VVER-440 type reactors, the shapes of acoustic standing waves (ASW) were determined at frequencies corresponding to four minimal oscillation eigenfrequencies in the primary circuit coolant. On identification of the ASW modes and properties, experimental results based on six circulating loops in symmetric arrangement allowed determination of the three-dimensional space structure of the wave nodes and antinodes inside and outside of the reactor vessel (RV). As part of this analysis, the geometric features of the primary circuit that caused the formation of these standing waves were identified. Differences in each ASW shape were shown to cause different individual effects on the neutron field in the reactor core and on fuel assembly vibration. This has been partially confirmed by ex-core neutron ionization chamber noise analysis. One type of ASW, possessing an antinode inside the RV, can be used for measurement of the pressure coefficient of reactivity. However, this must be done with care to avoid the potential for incorrect results in some cases. The results presented in this paper can be readily extended to other VVER type reactors with both odd and even number of loops. (author)

  2. Reactor power monitoring device

    International Nuclear Information System (INIS)

    Kono, Shigehiro.

    1990-01-01

    Among a plurality of power monitoring programs in a reactor power monitoring device, rapid response is required for a scram judging program for the power judging processing of scram signals. Therefore, the scram judging program is stored independently from other power monitoring programs, applied with a priority order, and executed in parallel with other programs, to output scram signals when the detected data exceeds a predetermined value. As a result, the capacity required for the scram judging program is reduced and the processing can be conducted in a short period of time. In addition, since high priority is applied to the scram judging program which is divided into a small capacity, it is executed at higher frequency than other programs when they are executed in parallel. That is, since the entire processings for the power monitoring program are repeated in a short cycle, the response speed of the scram signals required for high responsivity can be increased. (N.H.)

  3. Operation of Nuclear Fuel Based on Reprocessed Uranium for VVER-type Reactors in Competitive Nuclear Fuel Cycles

    Energy Technology Data Exchange (ETDEWEB)

    Troyanov, V.; Molchanov, V.; Tuzov, A. [TVEL Corporation, 49 Kashirskoe shosse, Moscow 115409 (Russian Federation); Semchenkov, Yu.; Lizorkin, M. [RRC ' Kurchatov Institute' (Russian Federation); Vasilchenko, I.; Lushin, V. [OKB ' Gidropress' (Russian Federation)

    2009-06-15

    Current nuclear fuel cycle of Russian nuclear power involves reprocessed low-enriched uranium in nuclear fuel production for some NPP units with VVER-type LWR. This paper discusses design and performance characteristics of commercial nuclear fuel based on natural and reprocessed uranium. It presents the review of results of commercial operation of nuclear fuel based on reprocessed uranium on Russian NPPs-unit No.2 of Kola NPP and unit No.2 of Kalinin NPP. The results of calculation and experimental validation of safe fuel operation including necessary isotope composition conformed to regulation requirements and results of pilot fuel operation are also considered. Meeting the customer requirements the possibility of high burn-up achieving was demonstrated. In addition the paper compares the characteristics of nuclear fuel cycles with maximum length based on reprocessed and natural uranium considering relevant 5% enrichment limitation and necessity of {sup 236}U compensation. The expedience of uranium-235 enrichment increasing over 5% is discussed with the aim to implement longer fuel cycles. (authors)

  4. Analysis of VVER-1000 large and small break LOCA experiments with RELAP5/MOD3.2

    International Nuclear Information System (INIS)

    Rychkov, M.; Chikkanagoudar, U.; Sehgal, B.R.

    2004-01-01

    A RELAP5 model for the analysis of the PSB-VVER test facility was developed by EREC in Russia. The PSB-VVER is a large-scale integral test facility to model the VVER-1000 type NPP. The volume and power scale in this test facility is 1:300 and the elevation scale is 1:1, which corresponds to the elevation mark of the reactor prototype. At the Division of Nuclear Safety, we have modified the PSB-VVER facility's RELAP5 model in order to analyze two of the transient tests performed on the PSB-VVER facility, which serve as the validation matrix described by NEA/CSNI. The objective of the work conducted was to validate the results obtained from RELAP5's calculation with the supplied experimental data from the PSB-VVER test facility. Two accident scenarios have been calculated and analyzed. After being verified against the '11% UP LOCA' test data, the RELAP5/MOD3.2 model was used for a so-called 'blind' transient calculation of the test '2*25% HL LOCA' and the results obtained were compared with the experimental data provided after the calculation. From the results of the qualitative and quantitative comparison of the 2 test calculations and the experimental data, we can state that the RELAP5/MOD3.2 code gives a satisfactory modeling of the PSB-VVER facility' thermal hydraulic phenomena

  5. APROS multifunctional simulator applications for VVER-440

    International Nuclear Information System (INIS)

    Porkholm, K.; Kantee, H.; Tiihonen, O.

    2000-01-01

    Fortum Engineering Ltd and the Technical Research Centre of Finland have developed APROS simulation software since 1986. APROS is a multifunctional simulator, which is used for process and automation design, safety analysis and training simulator applications. APROS has unique features and models developed especially for VVER-440 reactors. At first the paper gives a short overview of APROS multifunctional simulator. The rest of the paper deals with different kind of applications of APROS in VVER-440 reactors' improvement and operation development. (author)

  6. Nuclear power reactor physics

    International Nuclear Information System (INIS)

    Barjon, Robert

    1975-01-01

    The purpose of this book is to explain the physical working conditions of nuclear reactors for the benefit of non-specialized engineers and engineering students. One of the leading ideas of this course is to distinguish between two fundamentally different concepts: - a science which could be called neutrodynamics (as distinct from neutron physics which covers the knowledge of the neutron considered as an elementary particle and the study of its interactions with nuclei); the aim of this science is to study the interaction of the neutron gas with real material media; the introduction will however be restricted to its simplified expression, the theory and equation of diffusion; - a special application: reactor physics, which is introduced when the diffusing and absorbing material medium is also multiplying. For this reason the chapter on fission is used to introduce this section. In practice the section on reactor physics is much longer than that devoted to neutrodynamics and it is developed in what seemed to be the most relevant direction: nuclear power reactors. Every effort was made to meet the following three requirements: to define the physical bases of neutron interaction with different materials, to give a correct mathematical treatment within the limit of necessary simplifying hypotheses clearly explained; to propose, whenever possible, numerical applications in order to fix orders of magnitude [fr

  7. Reactor power control device

    International Nuclear Information System (INIS)

    Watanabe, Mitsutaka

    1997-01-01

    Hardware of an analog nuclear instrumentation system is reformed, a function generator is added to a setting calculation circuit of the nuclear instrumentation system, and each of setting lines of the nuclear instrumentation system is set in parallel with an upper limit curve in an operation region defined by a second order or third order equation. Upon transient change of abnormal power elevation during operation, scram signals are generated by power change in the same state as 100% rated operation due to elevation of reactor thermal power. Since the operation limit value relative to transient change due to power elevation can be made substantially equal with the same as that upon rated operation, the operation limit value for partial power operation state can be kept substantially the same level as that upon rated operation. When transition change caused by abnormal control rod withdrawal occurs during operation, a control rod withdrawal inhibition signal can ensure the power elevation width equal with that upon rated power operation, and since the withdrawal inhibition signal is generated in substantially the same withdrawing state, the operation limit value relative to a partial power operation state can be kept at the same level as that during rated operation. (N.H.)

  8. Modernization incore monitoring system of WWER-1000 reactors (V-320)

    International Nuclear Information System (INIS)

    Mitin, Valentin; Semchenkov, Yurij; Kalinushkin, Andrey

    2008-01-01

    Modern ICIS system for VVER-1000, including a number of sensors, cable runs, corresponding measuring equipment and computer engineering, software, accumulated 30 year experience of interaction researches on VVER reactors and is capable to ensure carrying out of control, protection, informational, diagnostic functions and thus to promote real increase of quality, reliability and safety in nuclear fuel and NPP power units operation

  9. Using a combination of weighting factor method and imperialist competitive algorithm to improve speed and enhance process of reloading pattern optimization of VVER-1000 reactors in transient cycles

    Energy Technology Data Exchange (ETDEWEB)

    Rahmani, Yashar, E-mail: yashar.rahmani@gmail.com [Department of Physics, Faculty of Engineering, Islamic Azad University, Sari Branch, Sari (Iran, Islamic Republic of); Shahvari, Yaser [Department of Computer Engineering, Payame Noor University (PNU), P.O. Box 19395-3697, Tehran (Iran, Islamic Republic of); Kia, Faezeh [Golestan Institute of Higher Education, Gorgan 49139-83635 (Iran, Islamic Republic of)

    2017-03-15

    Highlights: • This article was an attempt to optimize reloading pattern of Bushehr VVER-1000 reactor. • A combination of weighting factor method and the imperialist competitive algorithm was used. • The speed of optimization and desirability of the proposed pattern increased considerably. • To evaluate arrangements, a coupling of WIMSD5-B, CITATION-LDI2 and WERL codes was used. • Results reflected the considerable superiority of the proposed method over direct optimization. - Abstract: In this research, an innovative solution is described which can be used with a combination of the new imperialist competitive algorithm and the weighting factor method to improve speed and increase globality of search in reloading pattern optimization of VVER-1000 reactors in transient cycles and even obtain more desirable results than conventional direct method. In this regard, to reduce the scope of the assumed searchable arrangements, first using the weighting factor method and based on values of these coefficients in each of the 16 types of loadable fuel assemblies in the second cycle, the fuel assemblies were classified in more limited groups. In consequence, the types of fuel assemblies were reduced from 16 to 6 and consequently the number of possible arrangements was reduced considerably. Afterwards, in the first phase of optimization the imperialist competitive algorithm was used to propose an optimum reloading pattern with 6 groups. In the second phase, the algorithm was reused for finding desirable placement of the subset assemblies of each group in the optimum arrangement obtained from the previous phase, and thus the retransformation of the optimum arrangement takes place from the virtual 6-group mode to the real mode with 16 fuel types. In this research, the optimization process was conducted in two states. In the first state, it was tried to obtain an arrangement with the maximum effective multiplication factor and the smallest maximum power peaking factor. In

  10. Qualification of the core model DYN3D coupled with the code ATHLET as an advanced tool for the accident analysis of VVER type reactors. Pt. 2. Final report

    International Nuclear Information System (INIS)

    Grundmann, U.; Kliem, S.; Rohde, U.

    2002-10-01

    Benchmark calculations for the validation of the coupled neutron kinetics/thermohydraulic code complex DYN3D-ATHLET are described. Two benchmark problems concerning hypothetical accident scenarios with leaks in the steam system for a VVER-440 type reactor and the TMI-1 PWR have been solved. The first benchmark task has been defined by FZR in the frame of the international association 'Atomic Energy Research' (AER), the second exercise has been organized under the auspices of the OECD. While in the first benchmark the break of the main steam collector in the sub-critical hot zero power state of the reactor was considered, the break of one of the two main steam lines at full reactor power was assumed in the OECD benchmark. Therefore, in this exercise the mixing of the coolant from the intact and the defect loops had to be considered, while in the AER benchmark the steam collector break causes a homogeneous overcooling of the primary circuit. In the AER benchmark, each participant had to use its own macroscopic cross section libraries. In the OECD benchmark, the cross sections were given in the benchmark definition. The main task of both benchmark problems was to analyse the re-criticality of the scrammed reactor due to the overcooling. For both benchmark problems, a good agreement of the DYN3D-ATHLET solution with the results of other codes was achieved. Differences in the time of re-criticality and the height of the power peak between various solutions of the AER benchmark can be explained by the use of different cross section data. Significant differences in the thermohydraulic parameters (coolant temperature, pressure) occurred only at the late stage of the transient during the emergency injection of highly borated water. In the OECD benchmark, a broader scattering of the thermohydraulic results can be observed, while a good agreement between the various 3D reactor core calculations with given thermohydraulic boundary conditions was achieved. Reasons for the

  11. The FARC fuel archive of VVER

    International Nuclear Information System (INIS)

    Zizin, M.N.; Parfenova, N.A.; Proselkov, V.N.; Shishkov, L.K.

    1998-01-01

    The principles of organisation are explained and the structure of the FARC fuel archive for VVER reactors is described. The objective of the archive is accumulation of fuel data, data storage and obtaining the fuel using characteristics. The working version of fuel archive on 01.07.98 is realised, in which the data tables for fuel assemblies for 169 VVER-440 cycles and 35 VVER-1000 cycles are stored. There are two different versions of fuel archive - for VVER-440 (FARC) and for VVER-1000 (FARC1000). A structure of some tables and the texts of programs for them differ. The algorithms and codes for checking integrity, reasonableness and reliability of fuel archive data are developed. (author)

  12. SCORPIO-VVER core monitoring and surveillance system with advanced capabilities

    International Nuclear Information System (INIS)

    Molnar, J.; Vocka, R.

    2009-01-01

    The SCORPIO-VVER system includes following features: 1) Validation of plant measurements and identification of sensor failures. 2) Optimum combination of measurements and calculations to obtain precise values of important parameters. 3) On-line 3D power distribution calculation with pin power reconstruction. 4) Limit checking and thermal margin calculation allowing for surveillance of VVER core limits such as DNBR, Sub-cooling margin, FdH and FQ peeking factors. 5) Integrated modules for monitoring fuel performance and coolant activity for identification of fuel failures. 6) Predictive capabilities and strategy planning, offering the possibility to check the consequences of operational manoeuvres in advance, prediction of critical parameters, etc. 7) Convenient monitoring of approach to criticality during reactor start-up. 8) Automated transition between cycles (fuel reload). The SCORPIO-VVER core monitoring system with its flexible and modular framework successfully responses to the plant operating needs and advances in nuclear fuel cycle strategies and fuel design. Modular framework allows for easy modifications of the system and implementation of new methods in physical modules. Even if the system is installed only on VVER-440 reactors, it could be adapted for VVER-1000 needs

  13. Experience with safety assessment of digital upgrading of IandC in VVER type reactors

    International Nuclear Information System (INIS)

    Wach, D.; Mulka, B.; Schnuerer, G.

    1997-01-01

    The digital upgrading of IandC systems important to safety in WWER type reactors requires a broad expertise in various knowledge fields. The approach of the Institute for safety Technology to the qualification and categorization of safety-critical software systems is highlighted. The role of the Institute in the qualification of the Teleperm XS and the type testing of its components is described. The aspects of the safety assessment of digital IandC systems in WWER type reactors is discussed in some detail. (A.K.)

  14. VVER-1000 backfitting programs

    International Nuclear Information System (INIS)

    Zabka, H.; Milhem, J.L.

    1998-01-01

    Russia, Ukraine, and Bulgaria have nineteen nuclear generating units of the VVER-1000/V-320 (1000 MWe PWR) type in operation. Most of these plants were built in the eighties. Their design is based on Soviet standards of the seventies. In the early eighties and, in particular, after the Chernobyl accident, new safety principles and supplementary specific standards were introduced. However, they were taken into account only to a limited extent in the design and construction of the VVER-1000/V-320 plants. A number of nuclear power plants, whose construction was stopped after the political changes in the countries of the former USSR, now are to be completed with the financial assistance of the Commission of the European Union and other Western organizations, respectively. This Western support is dependent on the condition that these plants attain a level of engineered safeguards comparable to that of PWR plants currently in operation in Western Europe. (orig.) [de

  15. Power reactor noise

    International Nuclear Information System (INIS)

    Thie, J.A.

    1981-01-01

    Noise analysis is a growing field that offers advantages such as simplicity, low cost, and natural multivariable interactions. A major advantage, continuous and undisturbed monitoring, supplies a means of obtaining early warnings of possible reactor malfunctions, thus preventing further complications by alerting opeators to a problem - and aiding in the diagnosis of that problem - before it demands major repairs. Dr. Thie hopes to further, through detailed explanations and over 70 illustrations, the acceptance of the use of noise analysis by the nuclear utility industry. Following an introductory chapter, the theoretical basis for the various methods of noise analysis is explained, and full chapters are devoted to the fundamentals of statistics for time-domain analysis and Fourier series and related topics for frequency-domain analysis. General experimental techniques and associated theoretical considerations are reviewed, leading to discussions of practical applications in the latter half of the book. Besides chapters giving examples of neutron noise and acoustical noise, chapters are also devoted to extensive examples from pressurized water reactor and boiling water reactor power plants

  16. Modelling of thermal mechanical behaviour of high burn-Up VVER fuel at power transients with special emphasis on the impact of fission gas induced swelling of fuel pellets

    International Nuclear Information System (INIS)

    Novikov, V.; Medvedev, A.; Khvostov, G.; Bogatyr, S.; Kuzetsov, V.; Korystin, L.

    2005-01-01

    This paper is devoted to the modelling of unsteady state mechanical and thermo-physical behaviour of high burn-up VVER fuel at a power ramp. The contribution of the processes related to the kinetics of fission gas to the consequences of pellet-clad mechanical interaction is analysed by the example of integral VVER-440 rod 9 from the R7 experimental series, with a pellet burn-up in the active part at around 60 MWd/kgU. This fuel rod incurred ramp testing with a ramp value ΔW 1 ∼ 250 W/cm in the MIR research reactor. The experimentally revealed residual deformation of the clad by 30-40 microns in the 'hottest' portion of the rod, reaching a maximum linear power of up to 430 W/cm, is numerically justified on the basis of accounting for the unsteady state swelling and additional degradation of fuel thermal conductivity due to temperature-induced formation and development of gaseous porosity within the grains and on the grain boundaries. The good prediction capability of the START-3 code, coupled with the advanced model of fission gas related processes, with regard to the important mechanical (residual deformation of clad, pellet-clad gap size, central hole filling), thermal physical (fission gas release) and micro-structural (profiles of intra-granular concentration of the retained fission gas and fuel porosity across a pellet) consequences of the R7 test is shown. (authors)

  17. Development of TVSA VVER-1000 fuel

    International Nuclear Information System (INIS)

    Samoilov, O.; Kaydalov, V.; Romanov, A.; Falkov, A.; Morozkin, O.; Sholin, E.

    2013-01-01

    The TVSA fuel assemblies with a rigid angle-piece skeleton operate at 21 VVER-1000 units of Kalinin NPP, and Ukrainian, and Czech and Bulgarian NPPs. The total of more than 6,000 TVSA fuel assemblies have been fabricated. High lifetime performance has been achieved, namely, the maximum FA burnup is 65 MW∙day/kgU; maximum fuel rod burnup is 72 MW∙day/kgU; the lifetime is 50,000 EFPH. The TVSA fuel assembly is being improved to enhance its technical and economic performance and competitiveness of the Russian fuel for the VVER-1000 reactor: 1) Reliability and safety are being enhanced; repairability is being ensured. 2) High burnup levels in fuel are being ensured. 3) The uranium content in FAs is being increased. 4) The operational life is being extended. 5) Thermal-technical characteristics of FAs are being improved. The basic TVSA fuel assembly design evolved into the TVSA-PLUS with the fuel column elongated by 150 mm. The TVSA-PLUS fuel assembly has been in operation since 2010 at Kalinin NPP power units; an eighteen-month cycle is implemented at the uprated power of 104%. The TVSA-12PLUS fuel assembly has been developed with an elongated fuel column, optimized spacer grid positions (the spacer grid pitch is 340 mm) and with ensuring higher rigidity for the skeleton. It is provided for that fuel rods with the elevated uranium content and mixing intensifier grids will be used. The TVSA-T is developed for VVER-1000 reactor cores at the Temelin NPP. The TVSA-T is characterized by a load-carrying skeleton formed with angle-pieces and combined spacer grids that incorporate mixer grids. The TVSA-T design won the international tender to supply fuel to the Temelin NPP in the Czech Republic, and currently Temelin NPP Unit 1 and 2 are operating with the cores fully loaded with TVSA-Ts

  18. Nuclear reactor power supply

    International Nuclear Information System (INIS)

    Cook, B.M.

    1982-01-01

    The redundant signals from the sensor assemblies measuring the process parameters of a nuclear reactor power supply are transmitted each in its turn to a protection system which operates to actuate the protection apparatus for signals indicating off-process conditions. Each sensor assembly includes a number of like sensors measuring the same parameters. The sets of process signals derived from the sensor assemblies are each in its turn transmitted from the protection system to the control system which impresses control signals on the reactor or its components to counteract the tendency for conditions to drift off-normal status requiring operation of the protection system. A parameter signal selector is interposed between the protection system and the control system. This selector prevents a parameter signal of a set of signals, which differs from the other parameters signals of the set by more than twice the allowable variation of the sensors which produce the set, from passing to the control system. The selectors include a pair of signal selection units, one unit sending selected process signals to primary control channels and the other sending selected process signals to back-up control channels. Test signals are periodically impressed by a test unit on a selected pair of a selected unit and control channels. When test signals are so impressed the selected control channel is disabled from transmitting control signals to the reactor and/or its associated components. This arrangement eliminates the possibility that a single component failure which may be spurious will cause an inadvertent trip of the reactor during test

  19. Modernization programme for nuclear power plant units with VVER-1000 in Ukraine

    International Nuclear Information System (INIS)

    Shenderovich, V.

    1997-01-01

    All Ukrainian nuclear power plants with WWER type reactors are briefly described from the safety point of view. Information is given on the design and construction of the units. The main goals of upgrading are: elimination of incompliances with current safety standards, improvement of the reliability of safety significant systems, equipment and elements, and implementation of IAEA recommendations. A list of actions making up the large upgrading programme is given; it includes 181 measures to be taken. At present the measures are being designed in order to find appropriate engineering solutions, to develop technical specifications for new equipment, and to ensure precise cost estimation. (M.D.)

  20. Tokamak experimental power reactor

    International Nuclear Information System (INIS)

    Stacey, W.M. Jr.; Abdou, M.A.; Brooks, J.N.

    1978-01-01

    A tokamak experimental power reactor has been designed that is capable of producing net electric power over a wide range of possible operating conditions. A net production of 81 MW of electricity is expected from the design reference conditions that assume a value of 0.07 for beta-toroidal, a maximum toroidal magnetic field of 9 T and a thermal conversion efficiency of 30%. Impurity control is achieved through the use of a low-Z first wall coating. This approach allows a burn time of 60 seconds without the incorporation of a divertor. The system is cooled by a dual pressurized water/steam system that could potentially provide thermal efficiencies as high as 39%. The first surface facing the plasma is a low-Z coated water cooled panel that is attached to a 20 cm thick blanket module. The vacuum boundary is removed a total of 22 cm from the plasma, thereby minimizing the amount of radiation damage in this vital component. Consideration is given in the design to the possible use of the EPR as a materials test reactor. It is estimated that the total system could be built for less than 550 million dollars

  1. Test facility of the VVER-440 condensation-type pressure suppression system

    International Nuclear Information System (INIS)

    Wolff, H.; Arndt, S.

    2004-01-01

    Since the early nineties, GRS has supported regulatory authorities in Central and Eastern Europe in performing safety assessments of nuclear power plants. Especially studies of the condensation-type pressure suppression system of VVER-440/V-213-type plants have been important in this respect. Major steps in demonstrating complete functioning of the condensation-type pressure suppression system under accident conditions by experiments run in the Russian large scale test facility, BC V-213, have been completed in the past two years within the framework of various international experimental programs. The test results were used to validate specifically for power plants with VVER-400/V-213 reactors the COCOSYS GRS computer code, which is used in the safety assessments. The results of recalculations of the C02 EREC test, which simulates a break of a main steam pipe, demonstrate the present state of validation of COCOSYS for VVER condensation-type pressure suppression systems. (orig.) [de

  2. Ensuring the nuclear safety of VVER-440 reactor pressure vessels in Skoda, Concern Enterprise, Plzen

    International Nuclear Information System (INIS)

    Hrbek, Z.

    1985-01-01

    Various types of routine inspections are described of reactor pressure vessels with the aim of identifying residual lifetime and overall safety. The inspection programme includes: choice of systems and instruments, type of tests, test frequency, safety criteria, measures to be taken in case of unsatisfactory results, documentation. The criteria are given for periodical inspections and requirements listed for instruments and equipment. The main three groups of tests are: visual inspection and dimension tests, surface inspection and volumetric inspection. Briefly described is some of the equipment used. (M.D.)

  3. Operational benchmark for VVER-1000, unit 6, Kozloduy NPP

    International Nuclear Information System (INIS)

    Apostolov, T.; Petrov, B.

    1999-01-01

    Benchmark calculations have been carried out using the 3D nodal code TRAPEZ. Global neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and components descriptions as well as material compositions are given. The results presented include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overload assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. The information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of VVERs. (author)

  4. Power reactors in member states

    International Nuclear Information System (INIS)

    1975-01-01

    This is the first issue of a periodical computer-based listing of civilian nuclear power reactors in the Member States of the IAEA, presenting the situation as of 1 April 1975. It is intended as a replacement for the Agency's previous annual publication of ''Power and Research Reactors in Member States''. In the new format, the listing contains more information about power reactors in operation, under construction, planned and shut down. As far as possible all the basic design data relating to reactors in operation have been included. In future these data will be included also for other power reactors, so that the publication will serve to give a clear picture of the technical progress achieved. Test and research reactors and critical facilities are no longer listed. Of interest to nuclear power planners, nuclear system designers, nuclear plant operators and interested professional engineers and scientists

  5. Development of technologies for nuclear reactors of small and medium sized; Desarrollo de Tecnologias para Reactores Nucleares de pequeno y medio tamano

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-08-15

    This meeting include: countries presentations, themes and objectives of the training course, reactor types, design, EPR, APR1400, A P 1000, A PWR, ATMEA 1, VVER-1000, A PWR, ATMEA 1, VVER 1200, Boiling Water Reactor, A BWR, A BWR -II, ESBUR, Ke ren, AREVA, Heavy Water Reactor, Candu 6, Acr-1000, HWR, Bw, Iris, CAREM NuCcale, Smart, KLT-HOS, Westinghouse small modular Reactor, Gas Cooled Reactors, PBMR, React ores enfriados con metales liquidos, Hs, Prism,Terra Power, Hyper ion, appliance's no electric as de energia, Generation IV Reactors,VHTR, Gas Fast Reactor, Sodium Fast Reactor, Molten salt Reactor, Lfr, Water Cooled Reactor, Technology Assessment Process, Fukushima accident.

  6. Analytical and experimental justification of safe operation of fuel loads of VVER reactors at Rovno NPP

    International Nuclear Information System (INIS)

    Andrianov, A.; Zagrebelny, L.

    2011-01-01

    The main task during the nuclear fuel operation us ensuring of the larger fuel burnup and as a result - reduction of the fuel constituent in the electricity production cost. The neutron-physic calculations are performed using the qualified codes BIPR-7A and PERMAK developed by Kurchatov Institute. The limits for calculated parameters are set by the Ukrainian regulations. Calculation results are documented in reports subject for independent expert review requested by the regulatory authority. In this report the following item have presented: 1) metrological check and calibration of measuring channels; 2) fuel cycles at Rivne NPP; 3) determination of experimental values of thermal-physic and neutron-physic parameters; 4) ICIS equipment check, execution of the program confirming correct connection of the temperature and neutron flux monitoring sensors; 5) monitoring of the core TPh and NPh parameters in all operating modes; 6) monitoring of the fuel condition in the core and 7) FE leak tightness monitoring at the operating reactor

  7. Fast reactors in nuclear power

    Energy Technology Data Exchange (ETDEWEB)

    Kazachkovskii, O

    1981-02-01

    The possible applications are discussed of fast reactor nuclear power plants. Basic differences are explained in fast and thermal reactors, mainly with a view to nuclear fuel utilization. Discussed in more detail are the problems of nuclear fuel reproduction and the nost important technical problems of fast reactors. Flow charts are shown of heat transfer for fast reactors BN-350 (loop design) and BN-600 (integral coolant circuit design). Main specifications are given for demonstration and power fast reactors in operation, under construction and in project-stage.

  8. Tokamak reactor startup power

    International Nuclear Information System (INIS)

    Weldon, D.M.; Murray, J.G.

    1983-01-01

    Tokamak startup with ohmic heating (OH)-induced voltages requires rather large voltages and power supplies. On present machines, with no radiofrequency (rf)-assist provisions, hundreds of volts have been specified for their designs. With the addition of electron cyclotron resonant heating (ECRH) assist, the design requirements have been lowered. To obtain information on the cost and complexity associated with this ECRH-assisted, OH-pulsed startup voltage for ignition-type machines, a trade-off study was completed. The Fusion Engineering Device (FED) configuration was selected as a model because information was available on the structure. The data obtained are applicable to all tokamaks of this general size and complexity, such as the Engineering Test Reactor

  9. Calibration of RB reactor power

    International Nuclear Information System (INIS)

    Sotic, O.; Markovic, H.; Ninkovic, M.; Strugar, P.; Dimitrijevic, Z.; Takac, S.; Stefanovic, D.; Kocic, A.; Vranic, S.

    1976-09-01

    The first and only calibration of RB reactor power was done in 1962, and the obtained calibration ratio was used irrespective of the lattice pitch and core configuration. Since the RB reactor is being prepared for operation at higher power levels it was indispensable to reexamine the calibration ratio, estimate its dependence on the lattice pitch, critical level of heavy water and thickness of the side reflector. It was necessary to verify the reliability of control and dosimetry instruments, and establish neutron and gamma dose dependence on reactor power. Two series of experiments were done in June 1976. First series was devoted to tests of control and dosimetry instrumentation and measurements of radiation in the RB reactor building dependent on reactor power. Second series covered measurement of thermal and epithermal neuron fluxes in the reactor core and calculation of reactor power. Four different reactor cores were chosen for these experiments. Reactor pitches were 8, 8√2, and 16 cm with 40, 52 and 82 fuel channels containing 2% enriched fuel. Obtained results and analysis of these results are presented in this document with conclusions related to reactor safe operation

  10. Development of technologies for nuclear reactors of small and medium sized

    International Nuclear Information System (INIS)

    2011-08-01

    This meeting include: countries presentations, themes and objectives of the training course, reactor types, design, EPR, APR1400, A P 1000, A PWR, ATMEA 1, VVER-1000, A PWR, ATMEA 1, VVER 1200, Boiling Water Reactor, A BWR, A BWR -II, ESBUR, Ke ren, AREVA, Heavy Water Reactor, Candu 6, Acr-1000, HWR, Bw, Iris, CAREM NuCcale, Smart, KLT-HOS, Westinghouse small modular Reactor, Gas Cooled Reactors, PBMR, React ores enfriados con metales liquidos, Hs, Prism,Terra Power, Hyper ion, appliance's no electric as de energia, Generation IV Reactors,VHTR, Gas Fast Reactor, Sodium Fast Reactor, Molten salt Reactor, Lfr, Water Cooled Reactor, Technology Assessment Process, Fukushima accident.

  11. Tendencies in operating power reactors

    International Nuclear Information System (INIS)

    Brinckmann, H.F.

    1987-01-01

    A survey is given about new tendencies in operating power reactors. In order to meet the high demands for control and monitoring of power reactors modern procedures are applicated such as the incore-neutron flux detection by means of electron emission detectors and multi-component activation probes, the noise diagnostics as well as high-efficient automation systems

  12. Tokamak experimental power reactor

    International Nuclear Information System (INIS)

    Stacey, W.M. Jr.; Abdou, M.A.; Bertoncini, P.J.

    1976-01-01

    A conceptual design has been developed for a tokamak Experimental Power Reactor to operate at net electrical power conditions with a plant capacity factor of 50 percent for 10 yr. The EPR operates in a pulsed mode at a frequency of approximately 1/min, with approximately 75 percent duty cycle, is capable of producing approximately 72 MWe and requires 42 MWe. The annual tritium consumption is 16 kg. The EPR vacuum chamber is 6.25 m in major radius and 2.4 m in minor radius, is constructed of 2 cm thick stainless steel, and has 2 cm thick detachable, beryllium-coated coolant panels mounted on the interior. A 0.28 m stainless steel blanket and a shield ranging from 0.6 to 1.0 m surround the vacuum vessel. The coolant is H 2 O. Sixteen niobium-titanium superconducting toroidal field coils provide a field of 10 T at the coil and 4.47 T at the plasma. Superconducting ohmic heating and equilibrium field coils provide 135 V-s to drive the plasma current. Plasma heating is accomplished by 12 neutral beam injectors which provide 60 MW. The energy transfer and storage system consists of a central superconducting storage ring, a homopolar energy storage unit, and a variety of inductor-convertors

  13. Design and realization experience of Advanced Control Rod Group and Individual Control System (GIC) for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Cerny, V.; Novy, L.; Janour, J.; Ris, M.; Zidek, P.

    1997-01-01

    During the reactor refueling outage of unit 1 of the South Ukrainian nuclear power plant in mid-1996, full replacement of the reactor's group and individual control (GIC) system was performed. The main functions of the GIC system are briefly characterized. The structure of the advanced GIC system is described and shown by means of a diagram. The criteria used in deciding on the upgrading strategy are discussed in some detail. The implementation of the replacement is also dealt with, as is the testing and commissioning of the system. (A.K.)

  14. Severe accident management development program for VVER-1000 and VVER-440/213 based on the westinghouse owners group approach

    International Nuclear Information System (INIS)

    Felix, E.; Dessars, N.

    2003-01-01

    The development of the Westinghouse Owners Group Severe Accident Management Guidelines (WOG SAMG) between 1991 and 1994 was initiated in response to the U.S. Nuclear Regulatory Commission (NRC) requirement for addressing the regulatory severe accident concerns. Hence, the WOG SAMG is designed to interface with other existing procedures at the plant and is used in accident sequences that have progressed to the point where these other procedures are not applicable any longer, i.e. following core damage. The primary purpose of the WOG SAMG is to reach a controlled stable state, which can be declared when fission product releases are controlled, challenges to the confinement fission product boundary have been mitigated, and adequate heat removal is provided to the core and the containment. Although the WOG SAMG is a generic severe accident management guidance developed for use by the entirety of the operating Westinghouse PWR plants, provisions have been made in their development to address specific features of individual plants such as confinement type and the feasibility of reactor cavity flooding. Similarly, the generic SAMG does not address unique plant features and equipment, but rather allows for consideration of plant specific features and strategies. This adaptable approach has led to several SAMG development programs for VVER-1000 and VVER-440 type of power plants, under Westinghouse' s lead. The first of these programs carried out to completion was for Temelin NPP - VVER-1000 - in the first quarter of 2003. Other ongoing programs aim at providing a similar work for VVER-440 design, namely Dukovany, Mochovce and Bohunice NPPs. The challenge of adapting the existing generic WOG material to plants other than PWRs mainly arises for VVER-440 because of important differences in confinement design, making it more vulnerable to ex-vessel phenomena such as hydrogen burn. Also, for both eastern designs, cavity flooding strategy requires special consideration and

  15. Main results on pilot operation during 5 years of the 3rd generation fuel in VVER-440 reactors of Kola NPP

    International Nuclear Information System (INIS)

    Saprykin, V.; Sumarokov, M.; Gagarinskiy, A.; Sumarokova, A.; Adeev, V.

    2015-01-01

    In the report the results of comparison of main neutron-physical data of exploitation of nuclear fuel are presented for the average enrichment (on U - 235) of 4.87 for the 2nd and 3rd (12 piece) generations with the results of calculations by the complex of the programs KASKAD for 5 fuel loadings of Kola NPP Unit 4 with the reactor VVER- 440. The basic feature of fuel of the 3rd generation as compared with the 2nd is a presence of ribs of inflexibility at corners instead of cover of the fuel assembly and also the increased amount of uranium. The arrangement of fuel rods with different enrichment in fuel assemblies of the 2nd and 3rd generations is chosen identical for the convenient comparison of neutronic and thermohydraulic characteristics of the fuel of different generations. The fuel of 3rd generation was situated in the core symmetrically to the fuel of 2nd one

  16. Safety of nuclear power reactors

    International Nuclear Information System (INIS)

    MacPherson, H.G.

    1982-01-01

    Safety is the major public issue to be resolved or accommodated if nuclear power is to have a future. Probabilistic Risk Analysis (PRA) of accidental releases of low-level radiation, the spread and activity of radiation in populated areas, and the impacts on public health from exposure evolved from the earlier Rasmussen Reactor Safety Study. Applications of the PRA technique have identified design peculiarities in specific reactors, thus increasing reactor safety and establishing a quide for evaluating reactor regulations. The Nuclear Regulatory Commission and reactor vendors must share with utilities the responsibility for reactor safety in the US and for providing reasonable assurance to the public. This entails persuasive public education and information that with safety a top priority, changes now being made in light water reactor hardware and operations will be adequate. 17 references, 2 figures, 2 tables

  17. A nuclear power reactor

    International Nuclear Information System (INIS)

    Borrman, B.E.; Broden, P.; Lundin, N.

    1979-12-01

    The invention consists of shock absorbing support beams fastened to the underside of the reactor tank lid of a BWR type reactor, whose purpose is to provide support to the steam separator and dryer unit against accelerations due to earthquakes, without causing undue thermal stresses in the unit due to differential expansion. (J.I.W.)

  18. Decay heat power of spent nuclear fuel of power reactors with high burnup at long-term storage

    Science.gov (United States)

    Ternovykh, Mikhail; Tikhomirov, Georgy; Saldikov, Ivan; Gerasimov, Alexander

    2017-09-01

    Decay heat power of actinides and fission products from spent nuclear fuel of power VVER-1000 type reactors at long-term storage is calculated. Two modes of storage are considered: mode in which single portion of actinides or fission products is loaded in storage facility, and mode in which actinides or fission products from spent fuel of one VVER reactor are added every year in storage facility during 30 years and then accumulated nuclides are stored without addition new nuclides. Two values of fuel burnup 40 and 70 MW·d/kg are considered for the mode of storage of single fuel unloading. For the mode of accumulation of spent fuel with subsequent storage, one value of burnup of 70 MW·d/kg is considered. Very long time of storage 105 years accepted in calculations allows to simulate final geological disposal of radioactive wastes. Heat power of fission products decreases quickly after 50-100 years of storage. The power of actinides decreases very slow. In passing from 40 to 70 MW·d/kg, power of actinides increases due to accumulation of higher fraction of 244Cm. These data are important in the back end of fuel cycle when improved cooling system of the storage facility will be required along with stronger radiation protection during storage, transportation and processing.

  19. Decay heat power of spent nuclear fuel of power reactors with high burnup at long-term storage

    Directory of Open Access Journals (Sweden)

    Ternovykh Mikhail

    2017-01-01

    Full Text Available Decay heat power of actinides and fission products from spent nuclear fuel of power VVER-1000 type reactors at long-term storage is calculated. Two modes of storage are considered: mode in which single portion of actinides or fission products is loaded in storage facility, and mode in which actinides or fission products from spent fuel of one VVER reactor are added every year in storage facility during 30 years and then accumulated nuclides are stored without addition new nuclides. Two values of fuel burnup 40 and 70 MW·d/kg are considered for the mode of storage of single fuel unloading. For the mode of accumulation of spent fuel with subsequent storage, one value of burnup of 70 MW·d/kg is considered. Very long time of storage 105 years accepted in calculations allows to simulate final geological disposal of radioactive wastes. Heat power of fission products decreases quickly after 50-100 years of storage. The power of actinides decreases very slow. In passing from 40 to 70 MW·d/kg, power of actinides increases due to accumulation of higher fraction of 244Cm. These data are important in the back end of fuel cycle when improved cooling system of the storage facility will be required along with stronger radiation protection during storage, transportation and processing.

  20. Response of Soviet VVER-440 accident localization systems to overpressurization

    International Nuclear Information System (INIS)

    Kulak, R.F.; Fiala, C.; Sienicki, J.J.

    1989-01-01

    The Soviet designed VVER-440 model V230 and VVER-440 model V213 reactors do not use full containments to mitigate the effects of accidents. Instead, these VVER-440 units employ a sealed set of interconnected compartments, collectively called the accident localization system (ALS), to reduce the release of radionuclides to the atmosphere during accidents. Descriptions of the VVER accident localization structures may be found in the report DOE NE-0084. The objective of this paper is to evaluate the structural integrity of the VVER-440 ALS at the Soviet design pressure, and to determine their response to pressure loadings beyond the design value. Complex, three-dimensional, nonlinear, finite element models were developed to represent the major structural components of the localization systems of the VVER-440 models V230 and V213. The interior boundary of the localization system was incrementally pressurized in the calculations until the prediction of gross failure. 6 refs., 9 figs

  1. Reactor theory and power reactors. 1. Calculational methods for reactors. 2. Reactor kinetics

    International Nuclear Information System (INIS)

    Henry, A.F.

    1980-01-01

    Various methods for calculation of neutron flux in power reactors are discussed. Some mathematical models used to describe transients in nuclear reactors and techniques for the reactor kinetics' relevant equations solution are also presented

  2. Fractals in Power Reactor Noise

    International Nuclear Information System (INIS)

    Aguilar Martinez, O.

    1994-01-01

    In this work the non- lineal dynamic problem of power reactor is analyzed using classic concepts of fractal analysis as: attractors, Hausdorff-Besikovics dimension, phase space, etc. A new non-linear problem is also analyzed: the discrimination of chaotic signals from random neutron noise signals and processing for diagnosis purposes. The advantages of a fractal analysis approach in the power reactor noise are commented in details

  3. Power reactors in Member States. 1978 edition

    International Nuclear Information System (INIS)

    1978-01-01

    The computer-based reactor listing gives information on reactor core characteristics and plant systems for all power reactors in operation under construction and planned. The following two tables are included to give a general picture of the overall situation: Reactor types and net electrical power; Reactor units and net electrical power by country and cumulated by year

  4. Three-dimensional analysis of the coolant flow characteristics in the fuel assemblies of VVER-1000 reactors

    International Nuclear Information System (INIS)

    Dinh Van Thin; Tran Thi Nhan

    2015-01-01

    Computational Fluid Dynamics (CFD) is a widely used method around the world for complex flow and heat industrial problems. In this paper, the coolant flow parameters were investigated in subchannels of VVER-1000 reactor’s fuel assemblies by ANSYS V14.5 programme. The different mesh solutions and turbulence models were carried out to deal with the water flow problems such as velocity distribution, streamline, temperature and pressure change as well as the hydraulic resistances of the spacer grids. The obtained results are good agreement with the measured values and the published reports from other authors. (author)

  5. Power reactor information system (PRIS)

    International Nuclear Information System (INIS)

    1989-06-01

    Since the very beginning of commercial operation of nuclear power plants, the nuclear power industry worldwide has accumulated more than 5000 reactor years of experience. The IAEA has been collecting Operating Experience data for Nuclear Power Plants since 1970 which were computerized in 1980. The Agency has undertaken to make Power Reactor Information System (PRIS) available on-line to its Member States. The aim of this publication is to provide the users of PRIS from their terminals with description of data base and communication systems and to show the methods of accessing the data

  6. Power oscillations in BWR reactors

    International Nuclear Information System (INIS)

    Espinosa P, G.

    2002-01-01

    One of the main problems in the operation of BWR type reactors is the instability in power that these could present. One type of oscillations and that is the objective of this work is the named density wave, which is attributed to the thermohydraulic processes that take place in the reactor core. From the beginnings of the development of BWR reactors, the stability of these has been an important aspect in their design, due to its possible consequences on the fuel integrity. The reactor core operates in two phase flow conditions and it is observed that under certain power and flow conditions, power instabilities appear. Studying this type of phenomena is complex, due to that a reactor core is constituted approximately by 27,000 fuel bars with different distributions of power and flow. The phenomena that cause the instability in BWR reactors continue being matter of scientific study. In the literature mainly in nuclear subject, it can be observed that exist different methods and approximations for studying this type of phenomena, nevertheless, their results are focused to establish safety limits in the reactor operation, instead of studying in depth of the knowledge about. Also in this line sense of the reactor data analysis, the oscillations characteristic frequencies are obtained for trying to establish if the power is growing or decreasing. In addition to that before mentioned in this paper it is presented a rigorous study applying the volumetric average method, for obtaining the vacuum waves propagation velocities and its possible connection with the power oscillations. (Author)

  7. Results of 15 years experiments in the PMK-2 integral-type facility for VVERs

    Energy Technology Data Exchange (ETDEWEB)

    Szabados, L.; Ezsoel, G.; Perneczky, L. [KFKI Atomic Energy Research Institute, Budapest (Hungary)

    2001-07-01

    Due to the specific features of the VVER-440/213-type reactors the transient behaviour of such a reactor system is different from the usual PWR system behaviour. To provide an experimental database for the transient behaviour of VVER systems the PMK integral-type facility, the scaled down model of the Paks NPP was designed and constructed in the early 1980's. Since the start-up of the facility 48 experiments have been performed. It was confirmed through the experiments that the facility is a suitable tool for the computer code validation experiments and to the identification of basic thermal-hydraulic phenomena occurring during plant accidents. High international interest was shown by the four Standard Problem Exercises of the IAEA and by the projects financed by the EU-PHARE. A wide range of small- and medium-size LOCA sequences have been studied to know the performance and effectiveness of ECC systems and to evaluate the thermal-hydraulic safety of the core. Extensive studies have been performed to investigate the one- and two-phase natural circulation, the effect of disturbances coming from the secondary circuit and to validate the effectiveness of accident management measures like bleed and feed. The VVER-specific case, the opening of the SG collector cover was also extensively investigated. Examples given in the report show a few results of experiments and the results of calculation analyses performed for validation purposes of codes like RELAP5, ATHLET and CATHARE. There are some other white spots in Cross Reference Matrices for VVER reactors and, therefore, further experiments are planned to perform tests primarily in further support of accident management measures at low power states of plants to facilitate the improved safety management of VVER-440-type reactors. (authors)

  8. Results of 15 years experiments in the PMK-2 integral-type facility for VVERs

    International Nuclear Information System (INIS)

    Szabados, L.; Ezsoel, G.; Perneczky, L.

    2001-01-01

    Due to the specific features of the VVER-440/213-type reactors the transient behaviour of such a reactor system is different from the usual PWR system behaviour. To provide an experimental database for the transient behaviour of VVER systems the PMK integral-type facility, the scaled down model of the Paks NPP was designed and constructed in the early 1980's. Since the start-up of the facility 48 experiments have been performed. It was confirmed through the experiments that the facility is a suitable tool for the computer code validation experiments and to the identification of basic thermal-hydraulic phenomena occurring during plant accidents. High international interest was shown by the four Standard Problem Exercises of the IAEA and by the projects financed by the EU-PHARE. A wide range of small- and medium-size LOCA sequences have been studied to know the performance and effectiveness of ECC systems and to evaluate the thermal-hydraulic safety of the core. Extensive studies have been performed to investigate the one- and two-phase natural circulation, the effect of disturbances coming from the secondary circuit and to validate the effectiveness of accident management measures like bleed and feed. The VVER-specific case, the opening of the SG collector cover was also extensively investigated. Examples given in the report show a few results of experiments and the results of calculation analyses performed for validation purposes of codes like RELAP5, ATHLET and CATHARE. There are some other white spots in Cross Reference Matrices for VVER reactors and, therefore, further experiments are planned to perform tests primarily in further support of accident management measures at low power states of plants to facilitate the improved safety management of VVER-440-type reactors. (authors)

  9. Power Reactor Information System (PRIS)

    International Nuclear Information System (INIS)

    Spiegelberg, R.

    1992-01-01

    The IAEA has been collecting Operating Experience data for Nuclear Power Plants of the IAEA Member States since 1970. In order to facilitate an analysis of nuclear power plant performance as well as to produce relevant publications, all previously collected data supplied from the questionnaires were computerized in 1980 and the Power Reactor Information System was implemented. PRIS currently contains production records for the years up to and including 1990 and about 98% of the reactors-years operating experience in the world is contained in PRIS. (orig.)

  10. SCORPIO - VVER core surveillance system

    International Nuclear Information System (INIS)

    Hornaes, A.; Bodal, T.; Sunde, S.

    1998-01-01

    The Institutt for energiteknikk has developed the core surveillance system SCORPIO, which has two parallel modes of operation: the Core Follow Mode and the Predictive Mode. The main motivation behind the development of SCORPIO is to make a practical tool for reactor operators, which can increase the quality and quantity of information presented on core status and dynamic behavior. This can first of all improve plant safety, as undesired core conditions are detected and prevented. Secondly, more flexible and efficient plant operation is made possible. The system has been implemented on western PWRs, but the basic concept is applicable to a wide range of reactors including VVERs. The main differences between VVERs and typical western PWRs with respect to core surveillance requirements are outlined. The development of a VVER version of SCORPIO has been done in co-operation with the Nuclear Research Institute Rez, and industry partners in the Czech Republic. The first system is installed at Dukovany NPP, where the Site Acceptance Test was completed 6. March 1998.(author)

  11. Nuclear power reactor technology

    International Nuclear Information System (INIS)

    1978-09-01

    Risoe National Laboratory was established more than twenty years ago with research and development of nuclear reactor technology as its main objective. The Laboratory has by now accumulated many years of experience in a number of areas vital to nuclear reactor technology. The work and experience of, and services offered by the Laboratory within the following fields are described: Health physics site supervision; Treatment of low and medium level radioactive waste; Core performance evaluation; Transient analysis; Accident analysis; Fuel management; Fuel element design, fabrication and performance evaluation; Non-destructive testing of nuclear fuel; Theoretical and experimental structural analysis; Reliability analysis; Site evaluation. Environmental risk and hazard calculation; Review and analysis of safety documentation. Risoe has already given much assistance to the authorities, utilities and industries in such fields, carrying out work on both light and heavy water reactors. The Laboratory now offers its services to others as a consultant, in education and training of staff, in planning, in qualitative and quantitative analysis, and for the development and specification of fabrication techniques. (author)

  12. Cascade ICF power reactor

    International Nuclear Information System (INIS)

    Hogan, W.J.; Pitts, J.H.

    1986-01-01

    The double-cone-shaped Cascade reaction chamber rotates at 50 rpm to keep a blanket of ceramic granules in place against the wall as they slide from the poles to the exit slots at the equator. The 1 m-thick blanket consists of layers of carbon, beryllium oxide, and lithium aluminate granules about 1 mm in diameter. The x rays and debris are stopped in the carbon granules; the neutrons are multiplied and moderated in the BeO and breed tritium in the LiAlO 2 . The chamber wall is made up of SiO tiles held in compression by a network of composite SiC/Al tendons. Cascade operates at a 5 Hz pulse rate with 300 MJ in each pulse. The temperature in the blanket reaches 1600 K on the inner surface and 1350 K at the outer edge. The granules are automatically thrown into three separate vacuum heat exchangers where they give up their energy to high pressure helium. The helium is used in a Brayton cycle to obtain a thermal-to-electric conversion efficiency of 55%. Studies have been done on neutron activation, debris recovery, vaporization and recondensation of blanket material, tritium control and recovery, fire safety, and cost. These studies indicate that Cascade appears to be a promising ICF reactor candidate from all standpoints. At the 1000 MWe size, electricity could be made for about the same cost as in a future fission reactor

  13. Nuclear reactor power control device

    International Nuclear Information System (INIS)

    Koshi, Yuji; Sakata, Akira; Karatsu, Hiroyuki.

    1987-01-01

    Purpose: To control abrupt changes in neutron fluxes by feeding back a correction signal obtained from a deviation between neutron fluxes and heat fluxes for changing the reactor core flow rate to a recycling flow rate control system upon abrupt power change of a nuclear reactor. Constitution: In addition to important systems, that is, a reactor pressure control system and a recycling control system in the power control device of a BWR type power plant, a control circuit for feeding back a deviation between neutron fluxes and heat fluxes to a recycling flow rate control system is disposed. In the suppression circuit, a deviation signal is prepared in an adder from neutron flux and heat flux signals obtained through a primary delay filter. The deviation signal is passed through a dead band and an advance/delay filter into a correction signal, which is adapted to be fed back to the recycling flow rate control system. As a result, the reactor power control can be conducted smoothly and it is possible to effectively suppress the abrupt change or over shoot of the neutron fluxes and abrupt power change. (Kamimura, M.)

  14. Power control system in BWR type reactors

    International Nuclear Information System (INIS)

    Nishizawa, Yasuo.

    1980-01-01

    Purpose: To control the reactor power so that the power distribution can satisfy the limiting conditions, by regulating the reactor core flow rate while monitoring the power distribution in the reactor core of a BWR type reactor. Constitution: A power distribution monitor determines the power distribution for the entire reactor core based on the data for neutron flux, reactor core thermal power, reactor core flow rate and control rod pattern from the reactor and calculates the linear power density distribution. A power up ratio computing device computes the current linear power density increase ratio. An aimed power up ratio is determined by converting the electrical power up ratio transferred from a load demand input device into the reactor core thermal power up ratio. The present reactor core thermal power up ratio is subtracted from the limiting power up ratio and the difference is sent to an operation amount indicator and the reactor core flow rate is changed in a reactor core flow rate regulator, by which the reactor power is controlled. (Moriyama, K.)

  15. Low power unattended defense reactor

    International Nuclear Information System (INIS)

    Kirchner, W.L.; Meier, K.L.

    1984-01-01

    A small, low power, passive, nuclear reactor electric power supply has been designed for unattended defense applications. Through innovative utilization of existing proven technologies and components, a highly reliable, ''walk-away safe'' design has been obtained. Operating at a thermal power level of 200 kWt, the reactor uses low enrichment uranium fuel in a graphite block core to generate heat that is transferred through heat pipes to a thermoelectric (TE) converter. Waste heat is removed from the TEs by circulation of ambient air. Because such a power supply offers the promise of minimal operation and maintenance (OandM) costs as well as no fuel logistics, it is particularly attractive for remote, unattended applications such as the North Warning System

  16. Low power unattended defense reactor

    International Nuclear Information System (INIS)

    Kirchner, W.L.; Meier, K.L.

    1984-01-01

    A small, low power, passive, nuclear reactor electric power supply has been designed for unattended defense applications. Through innovative utilization of existing proven technologies and components, a highly reliable, walk-away safe design has been obtained. Operating at a thermal power level of 200 kWt, the reactor uses low enrichment uranium fuel in a graphite block core to generate heat that is transferred through heat pipes to a thermoelectric (TE) converter. Waste heat is removed from the TEs by circulation of ambient air. Because such a power supply offers the promise of minimal operation and maintenance (O and M) costs as well as no fuel logistics, it is particularly attractive for remote, unattended applications such as the North Warning System

  17. Power Reactor Embrittlement Data Base

    International Nuclear Information System (INIS)

    Kam, F.B.K.; Stallmann, F.W.; Wang, J.A.

    1990-01-01

    Regulatory and research evaluations of embrittlement predication models and of pressure vessel integrity can be greatly expedited by the use of a well-designed, computerized data base. The Power Reactor Embrittlement Data Base (PR-EDB) is such a comprehensive collection of data for US commercial nuclear reactors. The Nuclear Regulatory Commission (NRC) has provided financial support, and the Electric Power Research Institute (EPRI) has provided technical assistance in the quality assurance (QA) of the data to establish an industry-wide data base that will be maintained and updated on a long-term basis. Successful applications of the data base to several of NRC's evaluations have received favorable response and support for its continuation. The future direction of the data base has been designed to include the test reactor and other types of data of interest to the regulators and the researchers. 1 ref

  18. Power reactor core safety research

    International Nuclear Information System (INIS)

    Rim, C.S.; Kim, W.C.; Shon, D.S.; Kim, J.

    1981-01-01

    As a part of nuclear safety research program, a project was launched to develop a model to predict fuel failure, to produce the data required for the localizaton of fuel design and fabrication technology, to establish safety limits for regulation of nuclear power plants and to develop reactor operation method to minimize fuel failure through the study of fuel failure mechanisms. During 1980, the first year of this project, various fuel failure mechanisms were analyzed, an experimental method for out-of-pile tests to study the stress corrosion cracking (SCC) behaviour of Zircaloy cladding underiodine environment was established, and characteristics of PWR and CANDU Zircaloy specimens were examined. Also developed during 1980 were the methods and correlations to evaluate fuel failures in the reactor core based on operating data from power reactors

  19. Experimental power reactor

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The following five topics are discussed using figures and diagrams: (1) energy storage and transfer program, (2) thermomechanical analysis, (3) a steam dual-cycle power conversion system for the EPR, (4) EPR tritium facility scoping studies, and (5) vacuum systems

  20. Investigation of primary-to-secondary leakage accident on the PSB-VVER integral test facility

    International Nuclear Information System (INIS)

    Lipatov, I.A.; Dremin, G.I.; Galtchanskaya, S.A.; Chmal, I.I.; Moloshnikov, A.S.; Gorbunov, Y.S.; Antonova, A.I.; Elkin, I.V.

    2001-01-01

    The full text follows. The paper presents the main results from the test on primary-to-secondary leakage of 100 mm in equivalent diameter. The test was performed on the PSB-VVER integral test facility. PSB-VVER is a 4-loops scaled down model of primary system of NPP with VVER-1000 Russian type reactor. Volume - power scale is about 1/300 while elevation scale is 1/1. All components of the primary system of the reference NPP are modeled on PSB-VVER. Both passive (accumulators) and active (high and low pressure) ECCSs, pressurizer spray and relief circuits, feed water system and atmospheric dumping system (ADS) as well as the primary circuit gas remove emergency system are also simulated. The primary-to-secondary leakage was simulated using an external break line which connects the upper part of the hot header to SG water volume. The break line included a break nozzle (a cylindrical channel d = 5.8 mm, l/d = 10 with sharp inlet edge), quick-acting valve and two-phase mass flow rate measurement system. In addition loss of off-site power at the moment when a scram-signal is generated was assumed in the experiment. Thus the accident is to be considered as a beyond-design-basic one. The loss of off-site power results in the following: -main circulation pump shutdown; -pressurizer heaters switching off; -HPIS water cooling flow rate and number of points of water injection are reduced The study focuses on the adequacy of the associated accident management (AM) procedure developed by EDO ''GIDROPRESS'' as a General Designer of VVER-type reactors. The AM-procedure was adopted to the PSB-VVER test facility conditions using CATHARE (France) and DINAMIKA (Russia) codes analysis. The AM-procedure in PSB-VVER is as follows: after about 30 min of the onset of the accident, when the accident type and the localization of the SG affected become evident for the operator, he closes all the main steam isolation valves, inhibits the ADS actuation in the affected SG and begins to remove

  1. Investigation of primary-to-secondary leakage accident on the PSB-VVER integral test facility

    Energy Technology Data Exchange (ETDEWEB)

    Lipatov, I.A.; Dremin, G.I.; Galtchanskaya, S.A.; Chmal, I.I.; Moloshnikov, A.S.; Gorbunov, Y.S.; Antonova, A.I. [Electrogorsk Research and Engineering Center, EREC, Moscow (Russian Federation); Elkin, I.V. [RRC ' ' Kurchatov Institute, Moscow (Russian Federation)

    2001-07-01

    The full text follows. The paper presents the main results from the test on primary-to-secondary leakage of 100 mm in equivalent diameter. The test was performed on the PSB-VVER integral test facility. PSB-VVER is a 4-loops scaled down model of primary system of NPP with VVER-1000 Russian type reactor. Volume - power scale is about 1/300 while elevation scale is 1/1. All components of the primary system of the reference NPP are modeled on PSB-VVER. Both passive (accumulators) and active (high and low pressure) ECCSs, pressurizer spray and relief circuits, feed water system and atmospheric dumping system (ADS) as well as the primary circuit gas remove emergency system are also simulated. The primary-to-secondary leakage was simulated using an external break line which connects the upper part of the hot header to SG water volume. The break line included a break nozzle (a cylindrical channel d = 5.8 mm, l/d = 10 with sharp inlet edge), quick-acting valve and two-phase mass flow rate measurement system. In addition loss of off-site power at the moment when a scram-signal is generated was assumed in the experiment. Thus the accident is to be considered as a beyond-design-basic one. The loss of off-site power results in the following: -main circulation pump shutdown; -pressurizer heaters switching off; -HPIS water cooling flow rate and number of points of water injection are reduced The study focuses on the adequacy of the associated accident management (AM) procedure developed by EDO ''GIDROPRESS'' as a General Designer of VVER-type reactors. The AM-procedure was adopted to the PSB-VVER test facility conditions using CATHARE (France) and DINAMIKA (Russia) codes analysis. The AM-procedure in PSB-VVER is as follows: after about 30 min of the onset of the accident, when the accident type and the localization of the SG affected become evident for the operator, he closes all the main steam isolation valves, inhibits the ADS actuation in the affected SG

  2. VVER-440 control rod follower induced local power peaking computational benchmark: MCNP and KARATE solutions

    International Nuclear Information System (INIS)

    Hegyi, G.; Hordosy, G.; Kereszturi, A.; Maraczy, C.; Temesvari, E.

    2009-01-01

    In this paper the linear pin power calculation in the KARATE-440 code system are presented. The calculation results show that: 1) The coupler mathematical benchmark was solved by the KARATE code system using the same methods and approximations as in case of NPP applications. 2) Without Hf plate in the fuel pin row next to the problematic coupler section pronounced local power peak arises. 4) Though the underprediction of the peak by KARATE-SADR is 4%, it is in accordance with the applied uncertainty of KARATE-SADR. 5) The application of Hf plate solves the problem.

  3. Reactor power peaking information display

    International Nuclear Information System (INIS)

    Book, T.L.; Kochendarfer, R.A.

    1986-01-01

    This patent describes a system for monitoring operating conditions within a nuclear reactor. The system consists of a method for measuring the operating parameters within the nuclear reactor, including the position of axial power shaping rods and regulating control rod. It also includes a method for determining from the operating parameters the operating limits before a power peaking condition exists within the nuclear reactor, and a method for displaying the operating limits which consists of a visual display permitting the continuous monitoring of the operating conditions within the nuclear reactor as a graph of the shaping rod position vs the regulating rod position having a permissible area and a restricted area. The permissible area is further divided into a recommended operating area for steady state operation and a cursor located on the graph to indicate the present operating condition of the nuclear reactor to allow an operator to view any need for corrective action based on the movement of the cursor out of the recommended operating area and to take any corrective transient action within the permissible area

  4. Reactor power region measuring device

    International Nuclear Information System (INIS)

    Kashiwa, Takao.

    1996-01-01

    The device of the present invention can rapidly detect abnormality of a local power region monitor (LPRM) even at a low power region caused such as upon start-up of a BWR type reactor. Namely, the present invention comprises (1) an LPRM detector for measuring neutron fluxes in the reactor, (2) a gamma thermo detector for calibrating the sensitivity of the LPRM detector, (3) a comparison circuit for comparing the detected values of the detectors (1) and (2), and (4) an alarm circuit for outputting an alarm when the comparative difference of the output of the circuit (3) exceeds a predetermined value. Signals of an alarm for a lower limit of the LPRM detector have been issued continuously upon start-up and shut down of the reactor since neutron fluxes in the reactor are reduced. However, the gamma thermo detector is always secured in the inside of the reactor different from a travelling-type incore probe monitor (TIP) disposed so far for the same purpose. Accordingly, the alarm generated upon usual start-up can be eliminated by comparing the detected values of the detector (2) and abnormality of the detector (1) can be rapidly detected by judging the abnormality of the comparative difference. (I.S.)

  5. Status and prospects of the core surveillance system SCORPIO-VVER in Czech Republic and Slovakia

    International Nuclear Information System (INIS)

    Molnar, J.; Vocka, R.

    2011-01-01

    The SCORPIO-VVER core monitoring system has proved since the first installation at Dukovany NPP in 1999 to be a valuable tool for the reactor operators and reactor physicists. It is now installed on four units of Dukovany NPP (Czech Republic) and two units of Bohunice NPP (Slovak Republic) replacing the original Russian VK3 system. By both Czech and Slovak nuclear regulatory bodies it was licensed as a Technical Specification Surveillance tool. Since it's first installation, the development of SCORPIO-VVER system continues along with the changes in WWER reactors operation. The system is being adapted according the utility needs and several notable improvements in physical modules of the system were introduced. The latest most significant changes were done in connection with implementation of a new digital I and C system, loading of the optimized gadolinium bearing Gd2 fuel assemblies, improvements in the area of core design (neutron physics, core thermal hydraulics and fuel thermal mechanics), adaptation of the system to up-rated unit conditions, in design and methodology of the limit and technical specifications checking (implementation of the on-line shutdown margin calculation to the system) and improvements in the predictive part of the system (Strategy Generator). After the currently finished upgrades (Upgrade 2 at EBO Slovakia in 2009, Upgrade 5 at EDU Czech Republic in 2010) the SCORPIO-VVER is still in focus of Central European nuclear power plants with the road map of modification and implementation up to 2015. In April 2011 the Upgrade 3 at EBO Slovakia has been contracted to support the changed reactor technical specification and for support of the new type of fuel planned to load in 2012. During the summer of 2011 the discussions started with EDU NPP in Czech Republic regarding to the future development of the SCORPIO-VVER system up to 2015. Parallel with the support of current installations at NPPs the project of new installations is ongoing. During

  6. Simulation of long-term cooling in the VVER-640 power plant after a large break LOKA on the PACTEL facility

    International Nuclear Information System (INIS)

    Banati, J.

    2000-01-01

    The present report gives a short introduction to the safety features of the new Russian VVER-640 reactor design. In order to analyze the complex thermal hydraulic phenomena during long-term cooling after a large-break LOCA, experiments will be carried out in the PACTEL facility. For preparation, pre-test calculations were performed using the RELAPS/MOD3.2 computer code. The main part of the report discusses the results obtained by the program. The structure and options used in the input deck, as well as the efforts of code application to the simulation of proposed experiments are reviewed. A short sensitivity study is provided on the calculated results. Finally, conclusions are drawn for the code capabilities to represent the expectable trends in the upcoming tests. (orig.)

  7. Comparison of ASTEC 1.3 and ASTEC 1.3 R2 calculations in case of SBO for VVER-1000 reactor

    International Nuclear Information System (INIS)

    Atanasova, B.; Stefanova, A.; Grudev, P.

    2009-01-01

    The report presents the results from severe accident analyses performed with the both versions of ASTEC v1.3 and ASTEC v1.3R2 computer code for a VVER 1000 type of reactor. The purpose of this analysis is to assess the progress of ASTEC code modeling of main phenomena arising during hypothetical severe accidents. The final target of these analyses is to estimate the behaviour of the ASTEC code, its capability for simulation of severe accidents, including safety systems and Severe Accident Management (SAM) procedures. The analyses have been performed assuming a station blackout with simultaneous loss of HPIS, LPIS (ECCSs), EFWS and spray system due to failure of DGs. Hydro accumulators are not available. In the calculation it is assumed opening and stuck-open of PRZ relief valves. It has been organized the Fission Products path through the SEMPELL valve. It should be said that this investigation was limited to the 'in-vessel' phase of the sequence; therefore the effect of sprays on containment atmosphere has not been studied. (authors)

  8. Supply of appropriate nuclear technology for the developing world: small power reactors for electricity generation

    International Nuclear Information System (INIS)

    Heising-Goodman, C.D.

    1981-01-01

    This paper reviews the supply of small nuclear power plants (200 to 500 MWe electrical generating capacity) available on today's market, including the pre-fabricated designs of the United Kingdom's Rolls Royce Ltd and the French Alsthom-Atlantique Company. Also, the Russian VVER-440 conventionally built light-water reactor design is reviewed, including information on the Soviet Union's plans for expansion of its reactor-building capacity. A section of the paper also explores the characteristics of LDC electricity grids, reviewing methods available for incorporating larger plants into smaller grids as the Israelis are planning. Future trends in reactor supply and effects on proliferation rates are also discussed, reviewing the potential of the Indian 220 MWe pressurised heavy-water reactor, South Korean and Jananese potential for reactor exports in the Far East, and the Argentine-Brazilian nuclear programme in Latin America. This study suggests that small reactor designs for electrical power production and other applications, such as seawater desalination, can be made economical relative to diesel technology if traditional scaling laws can be altered by adopting and standardising a pre-fabricated nuclear power plant design. Also, economy can be gained if sufficient attention is concentrated on the design, construction and operating experience of suitably sized conventionally built reactor systems. (author)

  9. Informational system to assist decision making at spent nuclear fuel transportation from VVER-440, VVER-1000 and RBMK-1000 nuclear power plants

    International Nuclear Information System (INIS)

    Kuryndin, A.V.; Kirkin, A.M.; Stroganov, A.A.

    2012-01-01

    The developed informational system provides an automated estimations of nuclear and radiation safety parameters during spent nuclear fuel transportation from WWER-440 and WWER-1000 and RBMK-1000 nuclear power plants to the nuclear fuel cycle facilities, and allows us to determine the optimum cask loading from the dose rates distribution outside of protection point of view [ru

  10. Surveillance of nuclear power reactors

    International Nuclear Information System (INIS)

    Marini, J.

    1983-01-01

    Surveillance of nuclear power reactors is now a necessity imposed by such regulatory documents as USNRC Regulatory Guide 1.133. In addition to regulatory requirements, however, nuclear reactor surveillance offers plant operators significant economic advantages insofar as a single day's outage is very costly. The economic worth of a reactor surveillance system can be stated in terms of the improved plant availability provided through its capability to detect incidents before they occur and cause serious damage. Furthermore, the TMI accident has demonstrated the need for monitoring certain components to provide operators with clear information on their functional status. In response to the above considerations, Framatome has developed a line of products which includes: pressure vessel leakage detection systems, loose part detection systems, component vibration monitoring systems, and, crack detection and monitoring systems. Some of the surveillance systems developed by Framatome are described in this paper

  11. VVER-1000 small-medium break LOCAs predictions by ASTEC

    International Nuclear Information System (INIS)

    Georgieva, J.; Stefanova, A.; Atanasova, B.; Groudev, P.; Tusheva, P.; Mladenov, I.; Dimov, D.; Passalacqua, R.

    2005-01-01

    This paper deals with an assessment of ASTEC1.1v0 code in the simulation of small and medium break LOCAs (ranging from 30mm up to 70mm equivalent diameter). The reference power plant for this analysis is a VVER-1000/V320 (e.g. Units 5 and 6 at Kozloduy NPP). A preliminary comparison with MELCOR and RELAP-SCDAP severe accident codes will be discussed. This investigation has been performed in the framework of the SARNET project (under the Euratom 6 th framework program) by the FoBAUs group (Forum of Bulgarian ASTEC users). The FoBAUs group aims at the validation of the ASTEC code in the field of severe accidents. Future activities will target the ASTEC capability (as a PSA-level 2 tool) to simulate a large range of reactor accident scenarios with intervention of safety systems (either passive systems or operated by operators). The final target is to assess Severe Accident Management (SAM) procedures for VVER-1000 reactors. The ASTEC1.1v0 code version here used is the one released in June 2004 by the French IRSN (Institut de Radioprotection et de Surete Nucleaire) and the German GRS (Gesellschaft ReactorSicherheit mbH). (author)

  12. Power reactor pressure vessel benchmarks

    International Nuclear Information System (INIS)

    Rahn, F.J.

    1978-01-01

    A review is given of the current status of experimental and calculational benchmarks for use in understanding the radiation embrittlement effects in the pressure vessels of operating light water power reactors. The requirements of such benchmarks for application to pressure vessel dosimetry are stated. Recent developments in active and passive neutron detectors sensitive in the ranges of importance to embrittlement studies are summarized and recommendations for improvements in the benchmark are made. (author)

  13. The Optimization of power reactor control system

    International Nuclear Information System (INIS)

    Danupoyo, S.D.

    1997-01-01

    A power reactor is an important part in nuclear powered electrical plant systems. Success in controlling the power reactor will establish safety of the whole power plant systems. Until now, the power reactor has been controlled by a classical control system that was designed based on output feedback method. To meet the safety requirements that are now more restricted, the recently used power reactor control system should be modified. this paper describes a power reactor control system that is designed based on a state feedback method optimized with LQG (Linear-quadrature-gaussian) method and equipped with a state estimator. A pressurized-water type reactor has been used as the model. by using a point kinetics method with one group delayed neutrons. the result of simulation testing shows that the optimized control system can control the power reactor more effective and efficient than the classical control system

  14. Study on safety analysis of VVER-1200/V491 in scenario of Loss of Coolant Accidents along with partly failure of ECCS using RELAP5 code

    International Nuclear Information System (INIS)

    Hoang Minh Giang; Ha Thi Anh Dao; Hoang Tan Hung; Bui Thi Hoa; Nguyen Thi Tu Oanh; Dinh Anh Tuan; Pham Tuan Nam

    2017-01-01

    The advanced VVER-1200/V491 reactor designed with passive safety systems to deal with design extension conditions is primarily selected as priority candidate for Ninh Thuan 1 nuclear power plant project. So that, in order to enhance competence of nuclear safety and toward participation on review Safety Analysis Report (SAR) of Ninh Thuan nuclear Power project the study on safety analysis of VVER-1200/V491 in scenario of Loss of Coolant Accidents along with partly failure of ECCS is implemented. As requirement of the study, the input deck file of VVER-1200/V491 for RELAP5 and analysis report for some special case of LOCAs along with partly failure of ECCS are issued. (author)

  15. Performance of water cooled nuclear power reactor fuels in India – Defects, failures and their mitigation

    International Nuclear Information System (INIS)

    Ganguly, Chaitanyamoy

    2015-01-01

    Water cooled and moderated nuclear power reactors account for more than 95% of the operating reactors in the world today. Light water reactors (LWRs) consisting of pressurized water reactor (PWR), their Russian counterpart namely VVER and boiling water reactor (BWR) will continue to dominate the nuclear power market. Pressurized heavy water reactor (PHWR), also known as CANDU, is the backbone of the nuclear power program in India. Updates on LWR and PHWR fuel performance are being periodically published by IAEA, OECD-NEA and the World Nuclear Association (WNA), highlighting fuel failure rate and the mitigation of fuel defects and failures. These reports clearly indicate that there has been significant improvement in in – pile fuel performance over the years and the present focus is to achieve zero fuel failure in high burn up and high performance fuels. The present paper summarizes the status of PHWR and LWR fuel performance in India, highlighting the manufacturing and the related quality control and inspection steps that are being followed at the PHWR fuel fabrication plant in order to achieve zero manufacturing defect which could contribute to achieving zero in – pile failure rate in operating and upcoming PHWR units in India. (author)

  16. Containment leak-tightness enhancement at VVER 440 NPPs

    International Nuclear Information System (INIS)

    Prandorfy, M.

    2001-01-01

    The hermetic compartments of VVER 440 NPPs fulfil the function of the containment used at NPPs all over the word. The purpose of the containment is to protect the NPP personal against radioactive impact as well as to prevent radioactive leakage to the environment during a lost of coolant accident. Leak-tightness enhancement in NPPs with VVER 440/213 and VVER 440/230 reactors is an important safety issue. New procedures, measures and methods were adopted at NPPs in Mochovce, J. Bohunice, Dukovany and Paks for leak identification and sealing works performed by VUEZ Levice. (authors)

  17. Power reactors in Member States. 1979 edition

    International Nuclear Information System (INIS)

    1979-01-01

    This is the fifth issue of a periodic computer-based listing of nuclear power reactors, presenting the situation as of 1 May 1979. The basic design data for all reactors in operation, under construction, planned and shut down have been included. The following two tables are included to give a general picture of the overall situation: Table I: Reactor types and net electrical power. Table II: Reactor units and net electrical powered by country cummulated by year

  18. Computerized reactor power regulation with logarithmic controller

    International Nuclear Information System (INIS)

    Gossanyi, A.; Vegh, E.

    1982-11-01

    A computerized reactor control system has been operating at a 5 MW WWR-SM research reactor in the Central Research Institute for Physics, Budapest, for some years. This paper describes the power controller used in the SPC operating mode of the system, which operates in a 5-decade wide power range with +-0.5% accuracy. The structure of the controller easily limits the minimal reactor period and produces a reactor transient with constant period if the power demand changes. (author)

  19. CFD investigations of natural circulation between the RPV and the cooling pond of VVER-440 type reactors in incidental conditions during maintenance performed with the code CFX-4.3

    International Nuclear Information System (INIS)

    Legradi, G.; Aszodi, A.

    2002-01-01

    During the annual maintenance of the VVER-440 type reactors, the RPV, the cooling pond and the transfer pond form a connected flow domain. The reactor is cooled by the natural circulation, which develops in one or two main loops. The cooling pond has its own cooling loops. CFD calculations have been performed with the CFX-4.3 code to investigate whether it is possible to cool the reactor core in case the main loops are lost and other emergency systems are not available. The results point out that the cooling system of the cooling pond is not capable of cooling the reactor core with the present connection. Therefore, modifications of the cooling system are investigated which would make it suitable for removing the remanent heat from the core.(author)

  20. PCTRAN enhancement for large break loss of coolant accident concurrent with loss of offsite power in VVER-1000 simulation

    Energy Technology Data Exchange (ETDEWEB)

    Hadad, Kamal; Esmaeili-Sanjavanmareh, Mansour [Shiraz Univ., Shiraz (Iran, Islamic Republic of). Dept. of Nuclear Engineering

    2017-05-15

    PCTRAN capability to simulate a large break loss of coolant accident concurrent with the loss of offsite power in Bushehr Nuclear Power Plant is enhanced and investigated. Following the correction of the accident scenario for Bushehr nuclear power plant in PCTRAN, simulation results are compared with the final safety assessment report of that plant. As a result, the primary loop thermal hydraulics parameters including pressure, total flow rates, leakage flow rates and reactor power are in a good agreement with the reference data. Hot and cold leg temperature variations have the same trends as reference data but have a maximum of 80 C disagreement at the transient initiation. The reason for this disagreement is explained and its adjustment is discussed. Improvements of PCTRAN simulator are mainly due to enhancing user control for atmospheric steam dump valve, containment pressure and emergency core cooling systems which are thoroughly described in this paper.

  1. Operational power reactor health physics

    International Nuclear Information System (INIS)

    Watson, B.A.

    1987-01-01

    Operational Health Physics can be comprised of a multitude of organizations, both corporate and at the plant sites. The following discussion centers around Baltimore Gas and Electric's (BG and E) Calvert Cliffs Nuclear Power Plant, located in Lusby, Maryland. Calvert Cliffs is a twin Combustion Engineering 825 MWe pressurized water reactor site with Unit I having a General electric turbine-generator and Unit II having a Westinghouse turbine-generator. Having just completed each Unit's ten-year Inservice Inspection and Refueling Outge, a total of 20 reactor years operating health physics experience have been accumulated at Calvert Cliffs. Because BG and E has only one nuclear site most health physics functions are performed at the plant site. This is also true for the other BG and E nuclear related organizations, such as Engineering and Quality Assurance. Utilities with multiple plant sites have corporate health physics entity usually providing oversight to the various plant programs

  2. Power Reactor Embrittlement Data Base

    International Nuclear Information System (INIS)

    Kam, F.B.K.; Stallmann, F.W.; Wang, J.A.

    1990-01-01

    Regulatory and research evaluations of embrittlement prediction models and of vessel integrity under load can be greatly expedited by the use of a well designed, computerized embrittlement data base. The Power Reactor Embrittlement Data Base (PR-EDB) is a comprehensive collection of data from surveillance reports and other published reports of commercial nuclear reactors. The uses of the data base require that as many different data as available are collected from as many sources as possible with complete references and that subsets of relevant data can be easily retrieved and processed. The objectives of this NRC-sponsored program are the following: (1) to compile and to verify the quality of the PR-EDB; (2) to provide user-friendly software to access and process the data; (3) to explore or confirm embrittlement prediction models; and (4) to interact with standards organizations to provide the technical bases for voluntary consensus standards that can be used in regulatory guides, standard review plans, and codes. To achieve these goals, the data base architecture was designed after much discussion and planning with prospective users, namely, material scientists and members of the research staff. The current compilation of the PR-EDB (Version 1) contains results from surveillance capsule reports of 78 reactors with 381 data points for 110 different irradiated base materials and 161 data points for 79 different welds. Results from heat-affected zone materials are also listed. The time and effort required to process and evaluate different types of data in the PR-EDB have been drastically reduced from previous data bases. The Electric Power Research Institute (EPRI), reactor vendors, and utilities are in the process of providing back-up quality assurance checks of PR-EDB and will be supplementing the data base with additional data and documentation

  3. Reflooding and boil-off experiments in a VVER-440 like rod bundle and analyses with the CATHARE code

    International Nuclear Information System (INIS)

    Korteniemi, V.; Haapalehto, T.; Puustinen, M.

    1995-01-01

    Several experiments were performed with the VEERA facility to simulate reflooding and boil-off phenomena in a VVER-440 like rod bundle. The objective of these experiments was to get experience of a full-scale bundle behavior and to create a database for verification of VVER type core models used with modern thermal-hydraulic codes. The VEERA facility used in the experiments is a scaled-down model of the Russian VVER-440 type pressurized water reactors used in Loviisa, Finland. The test section of the facility consists of one full-scale copy of a VVER-440 reactor rod bundle with 126 full-length electrically heated rod simulators. Bottom and top-down reflooding, different modes of emergency core cooling (ECC) injection and the effect of heating power on the heat-up of the rods was studied. In this paper the results of calculations simulating two reflood and one boil-off experiment with the French CATHARE2 thermal-hydraulic code are also presented. Especially the performance of the recently implemented top-down reflood model of the code was studied

  4. Reflooding and boil-off experiments in a VVER-440 like rod bundle and analyses with the CATHARE code

    Energy Technology Data Exchange (ETDEWEB)

    Korteniemi, V.; Haapalehto, T. [Lappeenranta Univ. of Technology (Finland); Puustinen, M. [VTT Energy, Lappeenranta (Finland)

    1995-09-01

    Several experiments were performed with the VEERA facility to simulate reflooding and boil-off phenomena in a VVER-440 like rod bundle. The objective of these experiments was to get experience of a full-scale bundle behavior and to create a database for verification of VVER type core models used with modern thermal-hydraulic codes. The VEERA facility used in the experiments is a scaled-down model of the Russian VVER-440 type pressurized water reactors used in Loviisa, Finland. The test section of the facility consists of one full-scale copy of a VVER-440 reactor rod bundle with 126 full-length electrically heated rod simulators. Bottom and top-down reflooding, different modes of emergency core cooling (ECC) injection and the effect of heating power on the heat-up of the rods was studied. In this paper the results of calculations simulating two reflood and one boil-off experiment with the French CATHARE2 thermal-hydraulic code are also presented. Especially the performance of the recently implemented top-down reflood model of the code was studied.

  5. Reactor power reduction system and method

    International Nuclear Information System (INIS)

    Bruno, S.J.; Dunn, S.A.; Raber, M.

    1978-01-01

    A method of operating a nuclear power reactor is disclosed which enables an accelerated power reduction of the reactor without completely shutting the reactor down. The method includes monitoring the incidents which, upon their occurrence, would require an accelerated power reduction in order to maintain the reactor in a safe operation mode; calculating the power reduction required on the occurrence of such an incident; determining a control rod insertion sequence for the normal operation of the reactor, said sequence being chosen to optimize reactor power capability; selecting the number of control rods necessary to respond to the accelerated power reduction demand, said selection being made according to a priority determined by said control rod insertion sequence; and inserting said selected control rods into the reactor core. 11 claims, 13 figures

  6. Effect of a dual-purpose cask payload increment of spent fuel assemblies from VVER 1000 Bushehr Nuclear Power Plant on basket criticality

    International Nuclear Information System (INIS)

    Rezaeian, M.; Kamali, J.

    2017-01-01

    Dual-purpose casks can be utilized for dry interim storage and transportation of the highly radioactive spent fuel assemblies (SFAs) of Bushehr Nuclear Power Plant (NPP). Criticality safety analysis was carried out using the MCNP code for the cask containing 12, 18, or 19 SFAs. The basket materials of borated stainless steel and Boral (Al-B_4C) were investigated, and the minimum required receptacle pitch of the basket was determined. - Highlights: • Criticality safety analysis for a dual purpose cask was carried out. • The basket material of borated stainless steel and Boral were investigated. • Minimum receptacle pitch was determined for 12, 18, or 19 VVER 1000 spent fuel assemblies.

  7. Physical protection of power reactors

    International Nuclear Information System (INIS)

    Darby, J.L.

    1979-01-01

    Sandia Laboratories has applied a systematic approach to designing physical protection systems for nuclear facilities to commercial light-water reactor power plants. A number of candidate physical protection systems were developed and evaluated. Focus is placed on the design of access control subsystems at each of three plant layers: the protected area perimeter, building surfaces, and vital areas. Access control refers to barriers, detectors, and entry control devices and procedures used to keep unauthorized personnel and contraband out of the plant, and to control authorized entry into vital areas within the plant

  8. TU Electric reactor physics model verification: Power reactor benchmark

    International Nuclear Information System (INIS)

    Willingham, C.E.; Killgore, M.R.

    1988-01-01

    Power reactor benchmark calculations using the advanced code package CASMO-3/SIMULATE-3 have been performed for six cycles of Prairie Island Unit 1. The reload fuel designs for the selected cycles included gadolinia as a burnable absorber, natural uranium axial blankets and increased water-to-fuel ratio. The calculated results for both startup reactor physics tests (boron endpoints, control rod worths, and isothermal temperature coefficients) and full power depletion results were compared to measured plant data. These comparisons show that the TU Electric reactor physics models accurately predict important measured parameters for power reactors

  9. Feasible reactor power cutback logic development for an integral reactor

    International Nuclear Information System (INIS)

    Han, Soon-Kyoo; Lee, Chung-Chan; Choi, Suhn; Kang, Han-Ok

    2013-01-01

    Major features of integral reactors that have been developed around the world recently are simplified operating systems and passive safety systems. Even though highly simplified control system and very reliable components are utilized in the integral reactor, the possibility of major component malfunction cannot be ruled out. So, feasible reactor power cutback logic is required to cope with the malfunction of components without inducing reactor trip. Simplified reactor power cutback logic has been developed on the basis of the real component data and operational parameters of plant in this study. Due to the relatively high rod worth of the integral reactor the control rod assembly drop method which had been adapted for large nuclear power plants was not desirable for reactor power cutback of the integral reactor. Instead another method, the control rod assembly control logic of reactor regulating system controls the control rod assembly movements, was chosen as an alternative. Sensitivity analyses and feasibility evaluations were performed for the selected method by varying the control rod assembly driving speed. In the results, sensitivity study showed that the performance goal of reactor power cutback system could be achieved with the limited range of control rod assembly driving speed. (orig.)

  10. Nuclear reactor power supply system

    International Nuclear Information System (INIS)

    Cook, B.M.

    1982-01-01

    The redundant signals from the sensor assemblies measuring the process parameters of a nuclear reactor power supply are transmitted each in its turn to a protection system which operates to actuate the protection apparatus for signals indicating off-process conditions. Each sensor assembly includes a number of like sensors measuring the same parameters. The sets of process signals derived from the sensor assemblies are each in its turn transmitted from the protection system to the control system which impresses control signals on the reactor or its components to counteract the tendency for conditions to drift off-normal status requiring operation of the protection system. A parameter signal selector prevents a parameter signal which differs from the other parameter signals of the set by more than twice the allowable variation from passing to the control system. Test signals are periodically impressed by a test unit on a selected pair of a selection unit and control channels. This arrangement eliminates the possibility that a single component failure which may be spurious will cause an inadvertent trip of the reactor during test. (author)

  11. Nuclear power plant with several reactors

    Energy Technology Data Exchange (ETDEWEB)

    Grishanin, E I; Ilyunin, V G; Kuznetsov, I A; Murogov, V M; Shmelev, A N

    1972-05-10

    A design of a nuclear power plant suggested involves several reactors consequently transmitting heat to a gaseous coolant in the joint thermodynamical circuit. In order to increase the power and the rate of fuel reproduction the low temperature section of the thermodynamical circuit involves a fast nuclear reactor, whereas a thermal nuclear reactor is employed in the high temperature section of the circuit for intermediate heating and for over-heating of the working body. Between the fast nuclear and the thermal nuclear reactors there is a turbine providing for the necessary ratio between pressures in the reactors. Each reactor may employ its own coolant.

  12. Qualification of the nuclear reactor core model DYN3D coupled to the thermohydraulic system code ATHLET, applied as an advanced tool for accident analysis of VVER-type reactors. Final report; Qualifizierung des Kernmodells DYN3D im Komplex mit dem Stoerfallcode ATHLET als fortgeschrittenes Werkzeug fuer die Stoerfallanalyse von WWER-Reaktoren. T. 1. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Grundmann, U.; Kliem, S.; Krepper, E.; Mittag, S; Rohde, U.; Schaefer, F.; Seidel, A.

    1998-03-01

    The nuclear reactor core model DYN3D with 3D neutron kinetics has been coupled to the thermohydraulic system code ATHLET. In the report, activities on qualification of the coupled code complex ATHLET-DYN3D as a validated tool for the accident analysis of russian VVER type reactors are described. That includes: - Contributions to the validation of the single codes ATHLET and DYN3D by the analysis of experiments on natural circulation behaviour in thermohydraulic test facilities and solution of benchmark tasks on reactivity initiated transients, - the acquisition and evaluation of measurement data on transients in nuclear power plants, the validation of ATHLET-DYN3D by calculating an accident with delayed scram and a pump trip in VVER plants, - the complementary improvement of the code DYN3D by extension of the neutron physical data base, implementation of an improved coolant mixing model, consideration of decay heat release and xenon transients, - the analysis of steam leak scenarios for VVER-440 type reactors with failure of different safety systems, investigation of different model options. The analyses showed, that with realistic coolant mixing modelling in the downcomer and the lower plenum, recriticality of the scramed reactor due to overcooling can be reached. The application of the code complex ATHLET-DYN3D in Czech Republic, Bulgaria and the Ukraine has been started. Future work comprises the verification of ATHLET-DYN3D with a DYN3D version for the square fuel element geometry of western PWR. (orig.) [Deutsch] Das Reaktorkernmodell DYN3D mit 3D Neutronenkinetik wurde an den Thermohydraulik-Systemcode ATHLET angekoppelt. Im vorliegenden Bericht werden Arbeiten zur Qualifizierung des gekoppelten Codekomplexes zu einem validierten Hilfsmittel fuer Stoerfallablaufanalysen zu Reaktoren des russischen Typs WWER dargestellt. Diese umfassten im einzelnen: - Beitraege zur Validierung der Einzelcodes ATHLET und DYN3D anhand der Nachrechnung von Experimenten zum

  13. Nuclear reactor instrumentation power monitor

    International Nuclear Information System (INIS)

    Suzuki, Shigeru.

    1989-01-01

    The present invention concerns a nuclear reactor instrumentation power monitor that can be used in, for example, BWR type nuclear power plants. Signals from multi-channel detectors disposed on field units are converted respectively by LPRM signal circuits. Then, the converted signals are further converted by a multiplexer into digital signals and transmitted as serial data to a central monitor unit. The thus transmitted serial data are converted into parallel data in the signal processing section of the central monitor unit. Then, LPRM signals are taken out from each of channel detectors to conduct mathematical processing such as trip judgment or averaging. Accordingly, the field unit and the central monitor unit can be connected by way of only one data transmission cable thereby enabling to reduce the number of cables. Further, since the data are transmitted on digital form, it less undergoes effect of noises. (I.S.)

  14. Rolls-Royce successful modernization of safety-critical Instrumentation and Control (I and C) equipment at the Dukovany VVER 440/213 Nuclear Power Plant, based on SPINLINE 3 platform

    International Nuclear Information System (INIS)

    Rebreyend, P.; Burel, J.P.; Spoc, J.; Karasek, A.

    2010-01-01

    Rolls-Royce has provided on-time delivery of a substantial safety-critical I and C overhaul for four Nuclear reactors operated by Czech Republic utility, CEZ a.s. This nine-year project is considered to be one of the largest I and C modernization projects in the world. The Dukovany VVER 440 I and C modernization project and its key success factors are profiled in this paper. The project is in the final stages with the last unit to be completed in 2009. Beginning in September 2000, the project is in compliance with the initial schedule. Rolls-Royce has been designing and manufacturing I and C solutions dedicated to the implementation of safety and safety-related functions in nuclear power plants (NPPs) for more than 30 years. Though the early solutions were non-software-based, since 1984 software-based solutions for safety I and C functions have been deployed in operating NPPs across France and 15 other countries. The Rolls-Royce platform is suitable for implementation of safety I and C functions in new NPPs, as well as in the modernization of safety equipment in existing plants. CEZ a.s. is a major electricity supplier for the national grid. At Dukovany, CEZ a.s. operates four units of VVER-440/213-type reactors producing one quarter of CEZ a.s. electricity production. The first of these units was connected to the grid in 1985. Since the year 2000, the nine-year modernization program has been underway at Dukovany, at a cost of more than 200 million Euros. The equipment replacement was implemented during regular, planned outages of the original equipment and systems. After an international bidding phase, CEZ a.s. awarded a contract to Skoda JS for general engineering and project management. Individual subcontracts were then signed between Skoda JS and a consortium between Rolls-Royce and Areva for modernization of the safety systems, including the Reactor Protection System (RPS), the Reactor Control System (RCS), and the Post-Accident Monitoring System (PAMS). Two

  15. Upper plenum break LOCA investigation in the ISB-VVER and PSB-VVER facilities

    Energy Technology Data Exchange (ETDEWEB)

    Blinkov, V. N.; Melikhov, O. I.; Lipatov, I. A.; Nikonov, S. M.; Dremin, G. I.; Galchanskaya, S. A.; Gashenko, M. P.; Rovnov, A. A.; Kapustin, A. V.; Elkin, I. V. [EREC, Moscow (Russian Federation)

    2003-07-01

    The capability to define the actual NPP transient/accident scenario depends to a great extent on facilities' scaling and reliability of the system thermalhydraulic codes which, in turn, are assessed against the experimental data taken in the same facilities. At the present time, it is received fact that the rigorous modeling of the cumulative set of all thermalhydraulic processes in the plant primary and secondary sides during accident is unfeasible. Therefore, the extrapolation of the facilities loops behavior to the actual systems constitutes a fundamental problem in this area. In the paper, some aspects for the problem have been discussed in the course of comparative analysis of the data derived from the 11 % upper plenum break LOCA tests performed in the PSB-VVER and ISB-VVER integral test facilities under the close scenarios. Both facilities, PSB-VVER and ISB-VVER, are modeled the same VVER-1000 reactor in different scales. The thermalhydraulic behavior of the primary systems in both facilities has been discussed in the paper, and shown to be similar. Also, the attention has been focused upon the discrepancies in the significant variables trends. The discrepancies are shown to be caused by influence of peculiarities of the facilities hardware and due to the scale factor. The scaling study is an important aspect of the thermalhydraulic codes verification procedure. Being qualified against the experimentally simulated accident sequence in two test facilities of different scales, the thermalhydraulic codes will be capable of evaluation of the prototype behavior to greater accuracy.

  16. Reactor power control method upon accidents of electrical power system

    International Nuclear Information System (INIS)

    Hirose, Masao.

    1983-01-01

    Purpose: To enable to continue the operation of a BWR type reactor by avoiding the scram while suppressing the reactor power, just after the external disturbance such as earth-trouble in power-transmission network. Method: Steep power drop of an electrical generator is to be detected not only by a current-type power-load-unbalance relay but also with a power-type power-load-unbalance-relay. If steep power-drop was detected by the latter relay, a previously selected control rod is rapidly inserted into the reactor. In this way, in the case where there is a possibility of the reactor scram, the scram can be avoided by suppressing the reactor power, thus the reactor operation can be continued. (Kamimura, M.)

  17. Development of a VVER-1000 core loading pattern optimization program based on perturbation theory

    International Nuclear Information System (INIS)

    Hosseini, Mohammad; Vosoughi, Naser

    2012-01-01

    Highlights: ► We use perturbation theory to find an optimum fuel loading pattern in a VVER-1000. ► We provide a software for in-core fuel management optimization. ► We consider two objectives for our method (perturbation theory). ► We show that perturbation theory method is very fast and accurate for optimization. - Abstract: In-core nuclear fuel management is one of the most important concerns in the design of nuclear reactors. Two main goals in core fuel loading pattern design optimization are maximizing the core effective multiplication factor in order to extract the maximum energy, and keeping the local power peaking factor lower than a predetermined value to maintain the fuel integrity. Because of the numerous possible patterns of fuel assemblies in the reactor core, finding the best configuration is so important and challenging. Different techniques for optimization of fuel loading pattern in the reactor core have been introduced by now. In this study, a software is programmed in C language to find an order of the fuel loading pattern of a VVER-1000 reactor core using the perturbation theory. Our optimization method is based on minimizing the radial power peaking factor. The optimization process launches by considering an initial loading pattern and the specifications of the fuel assemblies which are given as the input of the software. The results on a typical VVER-1000 reactor reveal that the method could reach to a pattern with an allowed radial power peaking factor and increases the cycle length 1.1 days, as well.

  18. The integration of fast reactor to the fuel cycle in Slovakia

    International Nuclear Information System (INIS)

    Zajac, R.; Darilek, P.; Necas, V.

    2009-01-01

    A very topical problem of nuclear power is the fuel cycle back-end. One of the options is a LWR spent fuel reprocessing and a fissile nuclides re-use in the fast reactor. A large amount of spent fuel has been stored in the power plant intermediate storage during the operation of VVER-440 reactors in Slovakia. This paper is based on an analysis of Pu and minor actinides content in actual VVER-440 spent fuel stored in Slovakia. The next part presents the possibilities of reprocessing and Pu re-use in fast reactor under Slovak conditions. The fuel cycle consisting of the VVER-440 reactor, PUREX reprocessing plant and a sodium fast reactor was designed. The last section compares two parts of this fuel cycle: one is UOX cycle in VVER-440 reactor and the other is cycle in the fast reactor - SUPER PHENIX loaded with MOX fuel (Pu + Minor Actinides). The starting point is a single recycling of Pu from VVER-440 in the FR. The next step is multirecycling of Pu in the FR to obtain equilibrium cycle. This article is dealing with the solution of power production and fuel cycle indicators. All kinds of calculations were performed by computer code HELIOS 1.10. (authors)

  19. Estimation of material degradation of VVER-1000 baffle

    Science.gov (United States)

    Harutyunyan, Davit; Koš'ál, Michal; Vandlík, Stanislav; Hojná, Anna; Schulc, Martin; Flibor, Stanislav

    2017-09-01

    The planned lifetime of the first commercial VVER-1000 units were designed for 30 to 35 years. Most of the early VVER plants are now reaching and/or passing the 35-year mark. Service life extension for another 10 to 30 years is now under investigation. Life extension requires the evaluation of pressure vessel internals degradation under long-term irradiation. One of the possible limiting factors for the service life of VVERs is a void swelling of the Russian type titanium stabilized stainless 08Ch18N10T steel used to construct the baffle surrounding the core. This article aims to show first steps towards deeper analysis of the baffle degradation process and to demonstrate the possibilities of precise calculation and measurements on the VVER-1000 mock-up in LR-0 reactor.

  20. Reactor technology: power conversion systems and reactor operation and maintenance

    International Nuclear Information System (INIS)

    Powell, J.R.

    1977-01-01

    The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He 3 reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored

  1. Power reactor embrittlement data base

    International Nuclear Information System (INIS)

    Kam, F.B.K.; Stallmann, F.W.; Wang, J.A.

    1989-01-01

    Regulatory and research evaluations of embrittlement prediction models and of vessel integrity under load can be greatly expedited by the use of a well-designed, computerized embrittlement data base. The Power Reactor Embrittlement Data Base (PR-EDB) is a comprehensive collection of data from surveillance reports and other published reports of commercial nuclear reactors. The uses of the data base require that as many different data as available are collected from as many sources as possible with complete references and that subsets of relevant data can be easily retrieved and processed. The objectives of this NRC-sponsored program are the following: to compile and to verify the quality of the PR-EDB; to provide user-friendly software to access and process the data; to explore or confirm embrittlement prediction models; and to interact with standards organizations to provide the technical bases for voluntary consensus standards that can be used in regulatory guides, standard review plans, and codes. 9 figs

  2. Performance indicators for power reactors

    International Nuclear Information System (INIS)

    Gillies, C.; White, M.

    1995-11-01

    A review of Canadian and worldwide performance indicator definitions and data was performed to identify a set of indicators that could be used for comparison of performance among nuclear power plants. The results of this review are to be used as input to an AECB team developing a consistent set of performance indicators for measuring Canadian power reactor safety performance. To support the identification of performance indicators, a set of criteria was developed to assess the effectiveness of each indicator for meaningful comparison of performance information. The project identified a recommended set of performance indicators that could be used by AECB staff to compare the performance of Canadian nuclear power plants among themselves, and with international performance. The basis for selection of the recommended set and exclusion of others is provided. This report provides definitions and calculation methods for each recommended performance indicator. In addition, a spreadsheet has been developed for comparison and trending for the recommended set of indicators. Example trend graphs are included to demonstrate the use of the spreadsheet. (author). 50 refs., 11 tabs., 3 figs

  3. Development of an automated system of nuclear materials accounting for nuclear power stations with water-cooled, water-moderated reactors

    International Nuclear Information System (INIS)

    Babaev, N.S.

    1981-06-01

    The results of work carried out under IAEA Contract No. 2336/RB are described (subject: an automated system of nuclear materials accounting for nuclear power stations with water-cooled, water-moderated (VVER) reactors). The basic principles of an accounting system for this type of nuclear power plant are outlined. The general structure and individual units of the information computer program used to achieve automated accounting are described and instructions are given on the use of the program. A detailed example of its application (on a simulated nuclear power plant) is examined

  4. Present status and recent improvements of water chemistry at Russian VVER plants

    International Nuclear Information System (INIS)

    Mamet, V.; Yurmanov, V.

    2001-01-01

    Water chemistry is an important contributor to reliable plant operation, safety barrier integrity, plant component lifetime, radiation safety, environmental impact. Primary and secondary water chemistry guidelines of Russian VVER plants have been modified to meet the new safety standards. At present 14 VVER units of different generation are in operation at 5 Russian NPPs. There are eight 4-loop pressurised water reactors VVER-1000 (1000 MWe) and six 6-loop pressurised water reactors VVER-440 (440 MWe). Generally, water chemistry at East European VVER plants (about 40 VVER-440 and VVER-1000 units in Ukraine, Bulgaria, Slovakia, Czech Republic, Hungary, Finland and Armenia) is similar to water chemistry at Russian VVER plants. Due to similar design and structural materials some water chemistry improvements were introduced at East European plants after they has been successfully implemented at Russian plants and vice versa. Some water chemistry improvements will be implemented at modern VVER plants under construction in Ukraine, Slovakia, Czech Republic, Iran, China, India. (R.P.)

  5. Validation of Advanced Computer Codes for VVER Technology: LB-LOCA Transient in PSB-VVER Facility

    Directory of Open Access Journals (Sweden)

    A. Del Nevo

    2012-01-01

    Full Text Available The OECD/NEA PSB-VVER project provided unique and useful experimental data for code validation from PSB-VVER test facility. This facility represents the scaled-down layout of the Russian-designed pressurized water reactor, namely, VVER-1000. Five experiments were executed, dealing with loss of coolant scenarios (small, intermediate, and large break loss of coolant accidents, a primary-to-secondary leak, and a parametric study (natural circulation test aimed at characterizing the VVER system at reduced mass inventory conditions. The comparative analysis, presented in the paper, regards the large break loss of coolant accident experiment. Four participants from three different institutions were involved in the benchmark and applied their own models and set up for four different thermal-hydraulic system codes. The benchmark demonstrated the performances of such codes in predicting phenomena relevant for safety on the basis of fixed criteria.

  6. Modernizing the VVER-440/230

    International Nuclear Information System (INIS)

    Mink, F.J.

    1991-01-01

    The modernization of the VVER-440/230s is not fundamentally different from backfit projects on older pressurized water reactors which Westinghouse has completed elsewhere. However, carrying out such programmes only makes sense if the plants are expected to continue operation for their projected life or beyond. This clearly requires some licensing and political stability; both are essential if investors in the upgrading project are to be found. (author)

  7. Power controlling method for BWR type reactors

    International Nuclear Information System (INIS)

    Yoshida, Kenji.

    1983-01-01

    Purpose: To enable reactor operation exactly following after an aimed curve in the high power resuming and maintaining period without failures in cladding tubes. Method: Upon recovery of the reactor power to a high power level after changing the reactor power from the high power to the low power level, control rod is operated under such conditions that the linear power density after operation of the control rod does not exceed the PC envelope in the low power period, and the core flow rate is coordinated to the control rod operation. The linear power density can be suppressed within an allowable linear power density by the above operation during high power resuming and maintaining period and, as the result, PCI failures can be prevented. (Kamimura, M.)

  8. OECD/DOE/CEA VVER-1000 Coolant Transient Benchmark. Summary Record of the First Workshop (V1000-CT1)

    International Nuclear Information System (INIS)

    2003-01-01

    The first workshop for the VVER-1000 Coolant Transient Benchmark TT Benchmark was hosted by the Commissariat a l'Energie Atomique, Centre d'Etudes de Saclay, France. The V1000CT benchmark defines standard problems for validation of coupled three-dimensional (3-D) neutron-kinetics/system thermal-hydraulics codes for application to Soviet-designed VVER-1000 reactors using actual plant data without any scaling. The overall objective is to access computer codes used in the safety analysis of VVER power plants, specifically for their use in reactivity transient simulations in a VVER-1000. The V1000CT benchmark consists of two phases: V1000CT-1 - simulation of the switching on of one main coolant pump (MCP) while the other three MCP are in operation, and V1000CT- 2 - calculation of coolant mixing tests and Main Steam Line Break (MSLB) scenario. Further background information on this benchmark can be found at the OECD/NEA benchmark web site . The purpose of the first workshop was to review the benchmark activities after the Starter Meeting held last year in Dresden, Germany: to discuss the participants' feedback and modifications introduced in the Benchmark Specifications on Phase 1; to present and to discuss modelling issues and preliminary results from the three exercises of Phase 1; to discuss the modelling issues of Exercise 1 of Phase 2; and to define work plan and schedule in order to complete the two phases

  9. Power generator in BWR type reactors

    International Nuclear Information System (INIS)

    Yoshida, Kenji.

    1984-01-01

    Purpose: To enable to perform stable and dynamic conditioning operation for nuclear fuels in BWR type reactors. Constitution: The conditioning operation for the nuclear fuels is performed by varying the reactor core thermal power in a predetermined pattern by changing the predetermined power changing pattern of generator power, the rising rate of the reactor core thermal power and the upper limit for the rising power of the reactor core thermal power are calculated and the power pattern for the generator is corrected by a power conditioning device such that the upper limit for the thermal power rising rate and the upper limit for the thermal power rising rate are at the predetermined levels. Thus, when the relation between the reactor core thermal power and the generator electrical power is fluctuated, the fluctuation is detected based on the variation in the thermal power rising rate and the limit value for the thermal power rising rate, and the correction is made to the generator power changing pattern so that these values take the predetermined values to thereby perform the stable conditioning operation for the nuclear fuels. (Moriyama, K.)

  10. Assessment of financial expenditure for Rivne NPP power units decommissioning

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Salij, L.M.

    2007-01-01

    The article covers some financial aspects of developing a decommissioning concept for Rivne NPP power units with reactor VVER-440 and VVER-1000. Possible methodological approaches to costs estimate have been analyzed. Preliminary results of cost estimation are presented for two decommissioning options: deferred and immediate dismantling. Principally possible options for accumulating assets have been analyzed to finance measures related to Rivne NPP decommissioning. A mathematical model has been proposed for creating decommissioning financial reserve

  11. Impacts on power reactor health physics programs

    International Nuclear Information System (INIS)

    Meyer, B.A.

    1991-01-01

    The impacts on power reactor health physics programs form implementing the revised 10 CFR Part 20 will be extensive and costly. Every policy, program, procedure and training lesson plan involving health physics will require changes and the subsequent retraining of personnel. At each power reactor facility, hundreds of procedures and thousands of people will be affected by these changes. Every area of a power reactor health physics program will be affected. These areas include; ALARA, Respiratory Protection, Exposure Control, Job Coverage, Dosimetry, Radwaste, Effluent Accountability, Emergency Planning and Radiation Worker Training. This paper presents how power reactor facilities will go about making these changes and gives possible examples of some of these changes and their impact on each area of power reactor health physics program

  12. Fast reactors: potential for power

    International Nuclear Information System (INIS)

    1983-02-01

    The subject is discussed as follows: basic facts about conventional and fast reactors; uranium economy; plutonium and fast reactors; cooling systems; sodium coolant; safety engineering; handling and recycling plutonium; safeguards; development of fast reactors in Britain and abroad; future progress. (U.K.)

  13. Thermionic reactors for space nuclear power

    Science.gov (United States)

    Homeyer, W. G.; Merrill, M. H.; Holland, J. W.; Fisher, C. R.; Allen, D. T.

    1985-01-01

    Thermionic reactor designs for a variety of space power applications spanning the range from 5 kWe to 3 MWe are described. In all of these reactors, nuclear heat is converted directly to electrical energy in thermionic fuel elements (TFEs). A circulating reactor coolant carries heat from the core of TFEs directly to a heat rejection radiator system. The recent design of a thermionic reactor to meet the SP-100 requirements is emphasized. Design studies of reactors at other power levels show that the same TFE can be used over a broad range in power, and that design modifications can extend the range to many megawatts. The design of the SP-100 TFE is similar to that of TFEs operated successfully in test reactors, but with design improvements to extend the operating lifetime to seven years.

  14. Method and device for controlling reactor power

    International Nuclear Information System (INIS)

    Oohashi, Masahisa; Masuda, Hiroyuki.

    1982-01-01

    Purpose: To enable load following-up operation of a reactor adapted to perform power conditioning by the control of the liquid poison density in the core and by the control rods. Constitution: In a case where the reactor power is repeatedly changed in a reactor having a liquid poison density control device and control rods, the time period for the power control is divided depending on the magnitude of the change with time in the reactivity and the optimum values are set for the injection and removal amount of the liquid poison within the divided period. Then, most parts of the control required for the power change are alloted to the liquid poison that gives no effect on the power distribution while minimizing the movement of the control rods, whereby the power change in the reactor as in the case of the load following-up operation can be practiced with ease. (Kawakami, Y.)

  15. Design and Computational Fluid Dynamics Optimization of the Tube End Effector for Reactor Pressure Vessel Head Type VVER-1000

    International Nuclear Information System (INIS)

    Novosel, D.

    2006-01-01

    In this paper is presented development and optimization of the tube end effector design which should consist of 4 ultrasonic transducers, 4 Eddy Current's transducers and Radiation Proof Dot Camera. Basically, designing was conducted by main input requests, such as: inner diameter of a tested reactor pressure vessel head penetration tube, dimensions of a transducers and maximum allowable vertical movement of a manipulator connection rod in order to cover all inner tube surface. As is obvious, for ultrasonic testing should be provided the thin layer of liquid material (in our case water was chosen) which is necessary to make physical contact between transducer surface and investigated inner tube surface. By help of Computational Fluid Dynamics, determined were parameters of geometry, as the most important factor of transducer housing, hydraulically parameters for water supply and primary drain together implemented into this housing, movement of the end effectors (vertical and cylindrical) and finally, necessary equipment which has to provide all hydraulically and pneumatic requirements. As the cylindrical surface of the inner tube diameter was liquefied and contact between transducer housing and tested tube wasn't ideally covered, water leakage could occur in downstream direction. To reduce water leakage, which is highly contaminated, developed was second water drain by diffuser assembly which is driven by Venturi pipe, commercially called vacuum generator. Using the Computational Fluid Dynamic, obtained was optimized geometry of diffuser control volume with the highest efficiency, in other words, unobstructed fluid flux. Afterwards, the end effectors system was synchronized to the existing operable system for NDT methods all invented and designed by INETEC. (author)

  16. VVER 1000-NPP Temelin safety upgrading

    International Nuclear Information System (INIS)

    Fleischhans, J.; Ubra, O.

    1995-01-01

    A modernisation program upgrading Temelin plant to meet internationally adopted standard has been implemented during plant design and construction phases. The initial Czech-Russian design (primary system was of Russian design, secondary system was of Czech design) has been extensively modified and adapted to present western safety criteria and operational requirements. The goals are to achieve a high level of safety, reliability, availability and load-following ability. The load-following ability and response to grid frequency changes are very important for the Czech Republic, since the nuclear capacity represents a high proportion of the overall electrical system there. On the basis of IAEA OSART missions and Halliburton NUS audit results and in compliance with recommendations of The State Office for Nuclear Safety, Czech Power Company and Czech scientists and researchers a modernisation program project for Temelin has been carried out. It includes three main groups of VVER1000 MW unit innovations: - Modernization and upgrading of the safety and control systems. - Fuel replacement and modification of the reactor core. - Innovation of some components of the primary and secondary systems. The tenders for instrumentation and control system, nuclear fuel, diagnostic system and radiation monitoring system were issued to the world-well known suppliers. The US company Westinghouse Electric >Corporation (WEC) was selected to submit contract for the delivery of instrumentation and control system primary side diagnostic system and for the delivery of nuclear fuel. The contract was signed in 1993

  17. Nuclear power reactors of new generation

    International Nuclear Information System (INIS)

    Ponomarev-Stepnoi, N.N.; Slesarev, I.S.

    1988-01-01

    The paper presents discussions on the following topics: fuel supply for nuclear power; expansion of the sphere of nuclear power applications, such as district heating; comparative estimates of power reactor efficiencies; safety philosophy of advanced nuclear plants, including passive protection and inherent safety concepts; nuclear power unit of enhanced safety for the new generation of nuclear power plants. The emphasis is that designers of new generation reactors face a complicated but technically solvable task of developing highly safe, efficient, and economical nuclear power sources having a wide sphere of application

  18. On detection of the possible use of VVERs for unreported production of plutonium. Final report for the period July 1988 - December 1989

    International Nuclear Information System (INIS)

    Simov, R.; Nelov, N.; Stoyanova, I.; Kovachev, N.; Yonchev, P.

    1989-01-01

    The study includes an analysis of the feasibility of unreported production of plutonium-239 in VVER-440 reactors. It is shown that for VVER-440 reactors 36 natural uranium oxide fuel assemblies in the peripheral region of the core need to be loaded to produce 8 kg of extra plutonium in one cycle. Substituting the peripheral fuel assemblies with natural uranium oxide fuel assemblies, the changes in the power peaking are negligible and do not affect reactor safety. Unreported production outside the core is not practical due to physical and mechanical constraints, low flux level, etc. The feasibility of unreported removal of irradiated material in spent fuel cask has been also assessed. After about a month cooling time, still within the refueling period, the irradiated natural uranium fuel assemblies could be removed off-site without significant health hazard to the workers. To improve the effectiveness of the safeguards objectives, additional inspection activities are suggested. 10 figs

  19. The Procedure for Determination of Special Margin Factors to Account for a Bow of the VVER-1000 Fuel Assemblies

    International Nuclear Information System (INIS)

    Tsyganov, Sergey V.; Marin, Stanislav V.; Shishkov, Lev K.

    2008-01-01

    Starting from 1980's, the problem of bow of the VVER-1000 reactor FAs and the effect of that on the operational safety is being discussed. At the initial period of time, the extension of time for dropping control rods of the control and protection system associated with this bow posed the highest threat. Later on, new more rigid structures were developed for FAs that eliminated the problems of control rods. However, bow of the VVER-1000 reactor FAs is observed up to now. The scale of this bow reduced significantly but it still effects safety. Even a minor bow available may lead to the noticeable increase of power of individual fuel pins associated with the local variation of the coolant amount. This effect must be taken into account on designing fuel loadings to eliminate the exceeding of set limitations. The introduction of additional special margins is the standard method for taking this effect into account. The present paper describes the conservative technique for the assessment of additional margins for bow of FAs of state-of-the-art designs. This technique is employed in the VVER-1000 reactor designing. The chosen conservatism degree is discussed as well as the method for its assurance and acceptable ways for its slackening. The example of the margin evaluation for the up-to-date fuel loading is given. (authors)

  20. The Procedure for Determination of Special Margin Factors to Account for a Bow of the VVER-1000 Fuel Assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Tsyganov, Sergey V.; Marin, Stanislav V.; Shishkov, Lev K. [Russian Research Center ' Kurchatov Institute' , 1., Kurchatov sq., 123182 Moscow (Russian Federation)

    2008-07-01

    Starting from 1980's, the problem of bow of the VVER-1000 reactor FAs and the effect of that on the operational safety is being discussed. At the initial period of time, the extension of time for dropping control rods of the control and protection system associated with this bow posed the highest threat. Later on, new more rigid structures were developed for FAs that eliminated the problems of control rods. However, bow of the VVER-1000 reactor FAs is observed up to now. The scale of this bow reduced significantly but it still effects safety. Even a minor bow available may lead to the noticeable increase of power of individual fuel pins associated with the local variation of the coolant amount. This effect must be taken into account on designing fuel loadings to eliminate the exceeding of set limitations. The introduction of additional special margins is the standard method for taking this effect into account. The present paper describes the conservative technique for the assessment of additional margins for bow of FAs of state-of-the-art designs. This technique is employed in the VVER-1000 reactor designing. The chosen conservatism degree is discussed as well as the method for its assurance and acceptable ways for its slackening. The example of the margin evaluation for the up-to-date fuel loading is given. (authors)

  1. Power supplyer for reactor coolant recycling pump

    International Nuclear Information System (INIS)

    Nara, Hiroshi; Okinaka, Yo.

    1991-01-01

    The present invention concerns a variable voltage/variable frequency static power source (static power source) used as a power source for a coolants recycling pump motor of a nuclear power plant. That is, during lower power operation such as start up or shutdown in which stoppage of the power source gives less effect to a reactor core, power is supplied from a power system, a main power generator connected thereto or a high voltage bus in the plant or a common high voltage bus to the static power source. However, during rated power operation, power is supplied from the output of an axially power generator connected with a main power generator having an extremely great inertia moment to the static power device. With such a constitution, the static power device is not stopped by the lowering of the voltage due to a thunderbolt falling accident or the like to a power-distribution line suddenly occurred in the power system. Accordingly, reactor core flowrate is free from rapid decrease caused by the reduction of rotation speed of the recycling pump. Accordingly, disadvantgages upon operation control in the reactor core is not caused. (I.S.)

  2. Method of the characteristics for calculation of VVER without homogenization

    Energy Technology Data Exchange (ETDEWEB)

    Suslov, I.R.; Komlev, O.G.; Novikova, N.N.; Zemskov, E.A.; Tormyshev, I.V.; Melnikov, K.G.; Sidorov, E.B. [Institute of Physics and Power Engineering, Obninsk (Russian Federation)

    2005-07-01

    The first stage of the development of characteristics code MCCG3D for calculation of the VVER-type reactor without homogenization is presented. The parallel version of the code for MPI was developed and tested on cluster PC with LINUX-OS. Further development of the MCCG3D code for design-level calculations with full-scale space-distributed feedbacks is discussed. For validation of the MCCG3D code we use the critical assembly VENUS-2. The geometrical models with and without homogenization have been used. With both models the MCCG3D results agree well with the experimental power distribution and with results generated by the other codes, but model without homogenization provides better results. The perturbation theory for MCCG3D code is developed and implemented in the module KEFSFGG. The calculations with KEFSFGG are in good agreement with direct calculations. (authors)

  3. Small and medium power reactors 1987

    International Nuclear Information System (INIS)

    1987-12-01

    This TECDOC follows the publication of TECDOC-347 Small and Medium Power Reactors Project Initiation Study - Phase I published in 1985 and TECDOC-376 Small and Medium Power Reactors 1985 published in 1986. It is mainly intended for decision makers in Developing Member States interested in embarking on a nuclear power programme. It consists of two parts: 1) Guidelines for the Introduction of Small and Medium Power Reactors in Developing Countries. These Guidelines were established during the Advisory Group Meeting held in Vienna from 11 to 15 May 1987. Their purpose is to review key aspects relating to the introduction of Small and Medium Power Reactors in developing countries; 2) Up-dated Information on SMPR Concepts Contributed by Supplier Industries. According to the recommendations of the Second Technical Committee Meeting on SMPRs held in Vienna in March 1985, this part contains the up-dated information formerly published in Annex I of the above mentioned TECDOC-347. Figs

  4. Small and medium power reactors 1987

    Science.gov (United States)

    1987-12-01

    This TECDOC follows the publication of TECDOC-347: Small and Medium Power Reactors (SMPR) Project Initiation Study, Phase 1, published in 1985 and TECDOC-376: Small and Medium Power Reactors 1985 published in 1986. It is mainly intended for decision makers in Developing Member States interested in embarking on a nuclear power program. It consists of two parts: (1) guidelines for the introduction of small and medium power reactors in developing countries. These Guidelines were established during the Advisory Group Meeting held in Vienna from 11 to 15 May 1987. Their purpose is to review key aspects relating to the introduction of small and medium power reactors in developing countries; (2) up-dated information on SMPR Concepts Contributed by Supplier Industries. According to the recommendations of the Second Technical Committee Meeting on SMPRs held in Vienna in March 1985, this part contains the up-dated information formerly published in Annex 1 of the above mentioned TECDOC-347.

  5. VVER-1000 RPV Head Examination Control System

    International Nuclear Information System (INIS)

    Erak, Z.; Gortan, K.

    2006-01-01

    This article presents the electronic system used for automated NDT examination of VVER-1000 Reactor Pressure Vessel Head (RPVH). The control system drives the inspection tool with end-effectors to needed position. When the final position is reached, the eddy current and ultra sound acquisition system performs the data acquisition. The system is composed of 3 layers. The first layer is the hardware layer consisting of motors driving the tool and end-effectors along with sensors needed to obtain the positioning data. The second layer is the MAC-8 control system performing basic monitoring and control routines as an interconnection between first and third layer. The third layer is the control software, running on PC, which is used as a human-machine-interface. Presentation contains details of examination techniques with focus on eddy current examination as well as details on manipulator and end effectors developed by Inetec for VVER-1000 RPVH examination.(author)

  6. Innovative instrumentation for VVERs based in non-invasive techniques

    International Nuclear Information System (INIS)

    Jeanneau, H.; Favennec, J.M.; Tournu, E.; Germain, J.L.

    2000-01-01

    Nuclear power plants such as VVERs can greatly benefit from innovative instrumentation to improve plant safety and efficiency. In recent years innovative instrumentation has been developed for PWRs with the aim of providing additional measurements of physical parameters on the primary and secondary circuits: the addition of new instrumentation is made possible by using non-invasive techniques such as ultrasonics and radiation detection. These innovations can be adapted for upgrading VVERs presently in operation and also in future VVERs. The following innovative instrumentation for the control, monitoring or testing at VVERs is described: 1. instrumentation for more accurate primary side direct measurements (for a better monitoring of the primary circuit); 2. instrumentation to monitor radioactivity leaks (for a safer plant); 3. instrumentation-related systems to improve the plant efficiency (for a cheaper kWh)

  7. Multiple microprocessor based nuclear reactor power monitor

    International Nuclear Information System (INIS)

    Lewis, P.S.; Ethridge, C.D.

    1979-01-01

    The reactor power monitor is a portable multiple-microprocessor controlled data acquisition device being built for the International Atomic Energy Association. Its function is to measure and record the hourly integrated operating thermal power level of a nuclear reactor for the purpose of detecting unannounced plutonium production. The monitor consists of a 3 He proportional neutron detector, a write-only cassette tape drive and control electronics based on two INTEL 8748 microprocessors. The reactor power monitor operates from house power supplied by the plant operator, but has eight hours of battery backup to cover power interruptions. Both the hourly power levels and any line power interruptions are recorded on tape and in memory. Intermediate dumps from the memory to a data terminal or strip chart recorder can be performed without interrupting data collection

  8. Power distribution forecasting device for reactors

    International Nuclear Information System (INIS)

    Tsukii, Makoto

    1981-01-01

    Purpose: To save expensive calculations on the forecasting of reactor power distribution. Constitution: Core status (CSD) such as entire coolant flow rate, pressures in the reactor, temperatures at the outlet and inlet and positions for control rods are inputted into a power distribution calculation device to calculate the power distribution based on physical models intermittently. Further, present power distribution is calculated based on in-core neutron flux measured values and CSD in a process control computer. Further, the ratio of the calculation results of the latter to those of the former is calculated, stored and inputted into a correction device to correct the forecast power distribution obtained by the power distribution calculation device. This enables to forecast the power distribution with excellent responsivity in the reactor site. (Furukawa, Y.)

  9. Power distribution monitor in a nuclear reactor

    International Nuclear Information System (INIS)

    Uematsu, Hitoshi

    1983-01-01

    Purpose: To enable accurate monitoring for the reactor power distribution within a short time in a case where abnormality occurs in in-core neutron monitors or in a case where the reactor core state changes after the calibration for the neutron monitors. Constitution: The power distribution monitor comprises a power distribution calculator adapted to be inputted counted values from a reactor core present state data instruments and calculate the neutron flux distribution in the reactor core and the power distribution based on previously incorporated physical models, an RCF calculator adapted to be inputted with the counted values from the in-core neutron monitors and the neutron flux distribution and the power distribution calculated in the power distribution calculator and compensate the counted errors included in the counted values form the in-core neutron monitors and the calculation errors included in the power distribution calculated in the power distribution calculator to thereby calculate the power distribution within the reactor core, and an input/output device for the input of the data required for said power distribution calculator and the display for the calculation result calculated in the RCF calculator. (Ikeda, J.)

  10. Power conditioning system for a nuclear reactor

    International Nuclear Information System (INIS)

    Higashigawa, Yuichi; Joge, Toshio.

    1981-01-01

    Purpose: To provide a power conditioning system for a BWR type reactor which has a function to be automatically operated within a range that the relationship between the heat power of the reactor and the electric power of an electric generator does not lose the safety of fuel by eliminating the unnecessary fluctuation of the power of the reactor. Constitution: A load request error signal fed from a conventional turbine control system to recirculation flow regulator is eliminated, and a reactor power conditioning system is newly provided, to which an electric generator power signal, a reactor average power area monitor signal and a load request signal are inputted. Thus, the load request signal is compared directly with the electric power of the electric generator, the recirculation flow rate is controlled by the compared result, and whether the correlation between the heat power of the reqctor and the electric power of the generator satisfies the correlation determined to prove the safety of fuel or not is checked. If this correlation is satisfied, the recirculation flow rate is merely automatically controlled. (Yoshino, Y.)

  11. Nuclear power reactors: reactor safety and military and civil defence

    International Nuclear Information System (INIS)

    Hvinden, T.

    1976-01-01

    The formation of fission products and plutonium in reactors is briefly described, followed by a short general discussion of reactor safety. The interaction of reactor safety and radioactive release considerations with military and civil defence is thereafter discussed. Reactors and other nuclear plants are factors which must be taken into account in the defence of the district around the site, and as potential targets of both conventional and guerilla attacks and sabotage, requiring special defence. The radiological hazards arising from serious damage to a power reactor by conventional weapons are briefly discussed, and the benefits of underground siting evaluated. Finally the author discusses the significance of the IAEA safeguards work as a preventive factor. (JIW)

  12. Identification of fast power reactivity effect in nuclear power reactor

    International Nuclear Information System (INIS)

    Efanov, A.I.; Kaminskas, V.A.; Lavrukhin, V.S.; Rimidis, A.P.; Yanitskene, D.Yu.

    1987-01-01

    A nuclear power reactor is an object of control with distributed parameters, characteristics of which vary during operation time. At the same time the reactor as the object of control has internal feedback circuits, which are formed as a result of the effects of fuel parameters and a coolant (pressure, temperature, steam content) on the reactor breeding properties. The problem of internal feedback circuit identification in a nuclear power reactor is considered. Conditions for a point reactor identification are obtained and algorithms of parametric identification are constructed. Examples of identification of fast power reactivity effect for the RBMK-1000 reactor are given. Results of experimental testing have shown that the developed method of fast power reactivity effect identification permits according to the data of normal operation to construct adaptive models for the point nuclear reactor, designed for its behaviour prediction in stationary and transition operational conditions. Therefore, the models considered can be used for creating control systems of nuclear power reactor thermal capacity (of RBMK type reactor, in particular) which can be adapted to the change in the internal feedback circuit characteristics

  13. MODERATOR ELEMENTS FOR UNIFORM POWER NUCLEAR REACTOR

    Science.gov (United States)

    Balent, R.

    1963-03-12

    This patent describes a method of obtaining a flatter flux and more uniform power generation across the core of a nuclear reactor. The method comprises using moderator elements having differing moderating strength. The elements have an increasing amount of the better moderating material as a function of radial and/or axial distance from the reactor core center. (AEC)

  14. A nuclear power reactor concept for Brazil

    International Nuclear Information System (INIS)

    Sefidvash, F.

    1980-01-01

    For the purpose of developing an independent national nuclear technology and effective manner of transferring such a technology, as well as developing a modern reactor, a new nuclear power reactor concept is proposed which is considered as a suitable and viable project for Brazil to support its development and finally construct its prototype as an indigeneous venture. (Author) [pt

  15. Proposal of criteria for evaluation of engineering safety factors of VVER core parameters

    International Nuclear Information System (INIS)

    Shishkov, L.; Tsyganov, S.; Dementiev, V.

    2009-01-01

    The paper states that the regulatory documentation, as a rule, do not give explicit recommendations on formation techniques of engineering safety factors for design limited parameters of normal operation (K eng ). The AER countries use different approaches to K eng evaluation (sometimes even one country in relation of various power units). The paper suggests the development of uniform rules to be used in calculation of engineering safety factor for all VVER reactors. The paper presents principal problems that must be solved in the course of the discussion, and in the form of an exercise suggests the way of their solution. (authors)

  16. Diversification of the VVER fuel market in Eastern Europe and Ukraine

    Energy Technology Data Exchange (ETDEWEB)

    Kirst, Michael [Westinghouse EMEA, Brussels (Belgium); Benjaminsson, Ulf; Oenneby, Carina [Westinghouse Electric Sweden AB, Vaesteraes (Sweden)

    2015-03-15

    There are a total of 33 VVER active reactors in the EU and Ukraine, accounting for the largest percentage of the total electricity supply in the countries operating these. The responsible governments and utilities operating these units want too see an increased diversification of the nuclear fuel supply. Westinghouse is the only nuclear fuel producer outside Russia, which has taken the major steps to develop, qualify and manufacture VVER fuel designs - both for VVER-440 and VVER-1000 reactors. The company has delivered reloads of VVER-440 fuel to Loviisa 2 in Finland, VVER-1000 fuel for both the initial core and follow-on regions to Temelin 1-2 in the Czech Republic and more recently reloads of VVER-1000 fuel to South Ukraine 2-3. Technical challenges in form of mechanical interference with the resident fuel have been encountered in Ukraine, but innovative solutions have been developed and successfully implemented and today Ukraine has, for the first time in its history, a viable VVER-1000 fuel design alternative, representing a tremendous lever in energy security for the country.

  17. SEISMIC DESIGN CRITERIA FOR NUCLEAR POWER REACTORS

    Energy Technology Data Exchange (ETDEWEB)

    Williamson, R. A.

    1963-10-15

    The nature of nuclear power reactors demands an exceptionally high degree of seismic integrity. Considerations involved in defining earthquake resistance requirements are discussed. Examples of seismic design criteria and applications of the spectrum technique are described. (auth)

  18. Reactor power control method and device

    International Nuclear Information System (INIS)

    Fushimi, Atsushi; Ishii, Yoshihiko; Miyamoto, Yoshiyuki; Ishii, Kazuhiko; Kiyoharu, Norihiko; Aizawa, Yuko.

    1997-01-01

    The present invention provides a method and a device suitable to rise the temperature and increase the pressure of the reactor to an aimed pressure in accordance with an aimed value for a reactor water temperature changing rate in the course of rising temperature and increasing pressure of the reactor upon start up of a BWR type power plant. Namely, neutron fluxes in the reactor and the temperature of reactor water are detected respectively. The maximum value among the detected values for the neutron fluxes is detected. The reactor water temperature changing rate is calculated based on the detected values of the reactor water temperature, from which the maximum value of the reactor water temperature changing rate is detected. An aimed value for the neutron flux is calculated in accordance with both detected maximum values and the aimed value of the reactor water temperature changing rate. The position of control rods is adjusted in accordance with the aimed value for the calculated neutron flux. Then, an aimed value for the neutron flux for realizing the aimed value for the reactor water temperature changing rate can be obtained accurately with no influence of the sensitivity of the detected values of the neutron fluxes and the time delay of the reactor water temperature changing rate. (I.S.)

  19. Low power reactor for remote applications

    International Nuclear Information System (INIS)

    Meier, K.L.; Palmer, R.G.; Kirchner, W.L.

    1985-01-01

    A compact, low power reactor is being designed to provide electric power for remote, unattended applications. Because of the high fuel and maintenance costs for conventional power sources such as diesel generators, a reactor power supply appears especially attractive for remote and inaccessible locations. Operating at a thermal power level of 135 kWt, the power supply achieves a gross electrical output of 25 kWe from an organic Rankine cycle (ORC) engine. By intentional selection of design features stressing inherent safety, operation in an unattended mode is possible with minimal risk to the environment. Reliability is achieved through the use of components representing existing, proven technology. Low enrichment uranium particle fuel, in graphite core blocks, cooled by heat pipes coupled to an ORC converter insures long-term, virtually maintenance free, operation of this reactor for remote applications. 10 refs., 7 figs., 3 tabs

  20. MIT research reactor. Power uprate and utilization

    Energy Technology Data Exchange (ETDEWEB)

    Hu, Lin-Wen [Nuclear Reactor Laboratory, Massachusetts Inst. of Technology, Cambridge, MA (United States)

    2012-03-15

    The MIT Research Reactor (MITR) is a university research reactor located on MIT campus. and has a long history in supporting research and education. Recent accomplishments include a 20% power rate to 6 MW and expanding advanced materials fuel testing program. Another important ongoing initiative is the conversion to high density low enrichment uranium (LEU) monolithic U-Mo fuel, which will consist of a new fuel element design and power increase to 7 MW. (author)

  1. PMK-2, the First Integral Thermal-Hydraulics Tests for the Safety Evaluation of VVER-440/213 Nuclear Power Plants

    Directory of Open Access Journals (Sweden)

    Gy. Ézsöl

    2012-01-01

    Full Text Available The PMK-2 facility is a full-pressure thermal-hydraulic model of the primary and partly the secondary circuit of the VVER-type units of Paks NPP. The facility was the first integral-type facility for VVERs. The PMK-2 was followed later by the PACTEL (for VVER-440, the ISB, and PSB for VVER-1000. Since the startup of the facility in 1985, 55 experiments have been performed primarily in international frameworks with the participation of experts from 29 European and overseas countries forming a scientific school to better understand VVER system behaviour and reach a high level of modelling of accident sequences. The ATHLET, CATHARE, and RELAP5 codes have been validated including both qualitative and quantitative assessments. The former was almost exclusively applied to the early phase of validation by integral experiments, while the quantitative assessments have been performed by the Fast Fourier Transform Based Method. Paper gives comprehensive information on the design features of PMK-2 facility with a special respect to the representativeness of phenomena, the experiments performed, and the results of the validation of ATHLET, CATHARE, and RELAP5 codes. Safety significance of the PMK-2 projects is also discussed.

  2. PMK-2, the First Integral Thermal-Hydraulics Tests for the Safety Evaluation of VVER-440/213 Nuclear Power Plants

    International Nuclear Information System (INIS)

    Ezsol, G.; Perneczky, L.; Szabados, L.; Toth, I.

    2012-01-01

    The PMK-2 facility is a full-pressure thermal-hydraulic model of the primary and partly the secondary circuit of the VVER-type units of Paks NPP. The facility was the first integral-type facility for VVERs. The PMK-2 was followed later by the PACTEL (for VVER-440), the ISB, and PSB for VVER-1000. Since the startup of the facility in 1985, 55 experiments have been performed primarily in international frameworks with the participation of experts from 29 European and overseas countries forming a scientific school to better understand VVER system behaviour and reach a high level of modelling of accident sequences. The ATHLET, CATHARE, and RELAP5 codes have been validated including both qualitative and quantitative assessments. The former was almost exclusively applied to the early phase of validation by integral experiments, while the quantitative assessments have been performed by the Fast Fourier Transform Based Method. Paper gives comprehensive information on the design features of PMK-2 facility with a special respect to the representativeness of phenomena, the experiments performed, and the results of the validation of ATHLET, CATHARE, and RELAP5 codes. Safety significance of the PMK-2 projects is also discussed

  3. Gaseous fuel reactors for power systems

    International Nuclear Information System (INIS)

    Helmick, H.H.; Schwenk, F.C.

    1978-01-01

    The Los Alamos Scientific Laboratory is participating in a NASA-sponsored program to demonstrate the feasibility of a gaseous uranium fueled reactor. The work is aimed at acquiring experimental and theoretical information for the design of a prototype plasma core reactor which will test heat removal by optical radiation. The basic goal of this work is for space applications, however, other NASA-sponsored work suggests several attractive applications to help meet earth-bound energy needs. Such potential benefits are small critical mass, on-site fuel processing, high fuel burnup, low fission fragment inventory in reactor core, high temperature for process heat, optical radiation for photochemistry and space power transmission, and high temperature for advanced propulsion systems. Low power reactor experiments using uranium hexafluoride gas as fuel demonstrated performance in accordance with reactor physics predictions. The final phase of experimental activity now in progress is the fabrication and testing of a buffer gas vortex confinement system

  4. reactor power control using fuzzy logic

    International Nuclear Information System (INIS)

    Ahmed, A.E.E.

    2001-01-01

    power stabilization is a critical issue in nuclear reactors. convention pd- controller is currently used in egypt second testing research reactor (ETRR-2). two fuzzy controllers are proposed to control the reactor power of ETRR-2 reactor. the design of the first one is based on a set of linguistic rules that were adopted from the human operators experience. after off-line fuzzy computations, the controller is a lookup table, and thus, real time controller is achieved. comparing this f lc response with the pd-controller response, which already exists in the system, through studying the expected transients during the normal operation of ETRR-2 reactor, the simulation results show that, fl s has the better response, the second controller is adaptive fuzzy controller, which is proposed to deal with system non-linearity . The simulation results show that the proposed adaptive fuzzy controller gives a better integral square error (i se) index than the existing conventional od controller

  5. Reactor Power Meter type SG-8

    Energy Technology Data Exchange (ETDEWEB)

    Glowacki, S W

    1981-01-01

    The report describes the principle and electronic circuits of the Reactor Power Meter type SG-8. The gamma radiation caused by the activity of the reactor first cooling circuit affectes the ionization chamber being the detector of the instrument. The output detector signal direct current is converted into the frequency of electric pulses by means of the current-to-frequency converter. The output converter frequency is measured by the digital frequency meter: the number of measured digits in time unit is proportional to the reactor power.

  6. Core designs of modern VVER projects

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kushmanov, S.; Vjalitsyn, V.; Vasilchenko, R.

    2015-01-01

    The presented operational experience of TVS - 2M (pilot-commercial operation started in 2006 at Balakovo NPP -1) enables to use it as reference for new projects because of similarity in designs and operational conditions. In the paper main parameters of fuel cycles, stability to impact of damaging factors, pilot operation of MG, new alloys, ADF and NTMC, upgrade of FA - 2M for the further power uprating, profiling of Gd-fuel rods for 18-month Fuel Cycle (FC) and perfection of absorber element design are the discussed issues. At the end author concluded that: 1) Core designs of new projects AES-2006 and VVER-TOI are based on extensive successful operational experience of the close prototype of TVS - 2M. 2) All improvements both of technical and economic parameters of fuel are subjected to representative examination by pilot operation at the power units with VVER-1000 being close prototypes of new designs

  7. In core-fuel management in approach to equilibrium of WWER-440 reactor; Prelazni rezim iskoriscenja goriva u nuklearnom reaktoru tipa VVER-440

    Energy Technology Data Exchange (ETDEWEB)

    Marinkovic, N [Boris Kidric Institute of nuclear sciences, Vinca, Belgrade (Yugoslavia)

    1978-07-01

    For the need of in core fuel management and prediction of fuel cycle costs as well as operating of a nuclear power plant behaviour of main physical parameters and refueling scheme during approach to equilibrium operation are indispensable. An estimation of a refueling scheme during forst six years of exploitation for a commercially proven PWR reactor of WWER-440 type is shown in this paper. (author)

  8. New generation of reactors for space power

    International Nuclear Information System (INIS)

    Boudreau, J.E.; Buden, D.

    1982-01-01

    Space nuclear reactor power is expected to enable many new space missions that will require several times to several orders of magnitude anything flown in space to date. Power in the 100-kW range may be required in high earth orbit spacecraft and planetary exploration. The technology for this power system range is under development for the Department of Energy with the Los Alamos National Laboratory responsible for the critical components in the nuclear subsystem. The baseline design for this particular nuclear sybsystem technology is described in this paper; additionally, reactor technology is reviewed from previous space power programs, a preliminary assessment is made of technology candidates covering an extended power spectrum, and the status is given of other reactor technologies

  9. Compact reactor/ORC power source

    International Nuclear Information System (INIS)

    Meier, K.L.; Kirchner, W.L.; Willcutt, G.J.

    1986-01-01

    A compact power source that combines an organic Rankine Cycle (ORC) electric generator with a nuclear reactor heat source is being designed and fabricated. Incorporating existing ORC technology with proven reactor technology, the compact reactor/ORC power source offers high reliability while minimizing the need for component development. Thermal power at 125 kWt is removed from the coated particle fueled, graphite moderated reactor by heat pipes operating at 500 0 C. Outside the reactor vessel and connected to the heat pipes are vaporizers in which the toluene ORC working fluid is heated to 370 0 C. In the turbine-alternator-pump (TAP) combined-rotating unit, the thermal energy of the toluene is converted to 25 kWe of electric power. Lumped parameter systems analyses combined with a finite element thermal analysis have aided in the power source design. The analyses have provided assurance of reliable multiyear normal operation as well as full power operation with upset conditions, such as failed heat pipes and inoperative ORC vaporizers. Because of inherent high reliability, long life, and insensitivity to upset conditions, this power source is especially suited for use in remote, inaccessible locations where fuel delivery and maintenance costs are high. 10 refs

  10. A compact reactor/ORC power source

    International Nuclear Information System (INIS)

    Meier, K.L.; Kirchner, W.L.; Willcutt, G.J.

    1986-01-01

    A compact power source that combines an organic Rankine cycle (ORC) electric generator with a nuclear reactor heat source is being designed and fabricated. Incorporating existing ORC technology with proven reactor technology, the compact reactor/ORC power source offers high reliability while minimizing the need for componenet development. Thermal power at 125 kWt is removed from the coated particle fueled, graphite moderated reactor by heat pipes operating at 500 0 C. Outside the reactor vessel and connected to the heat pipes are vaporizers in which the toluene ORC working fluid is heated to 370 0 C. In the turbine-alternator-pump (TAP) combined-rotating unit, the thermal energy of the toluene is converted to 25 kWe of electric power. Lumped parameter systems analyses combined with a finite element thermal analyses combined with a finite element thermal analysis have aided in the power source design. The analysis have provided assurance of reliable multiyear normal operation as well as full power operation with upset conditions, such as failed heat pipes and inoperative ORC vaporizers. Because of inherent high reliability, long life, and insensitivity to upset conditions, this power source is especially suited for use in remote, inaccessible locations where fuel delivery and maintenance costs are high

  11. Contributions of Modranska potrubni a.s. to the safety improvement of piping systems and valves of NPS type VVER 440 and VVER 1000

    International Nuclear Information System (INIS)

    Slach, J.

    2004-01-01

    The following activities are described: (i) Installation of pipe whip restraints on piping for high pressure and temperature steam and feed piping; (ii) Installation of air receivers for quick-acting valves with air actuator on VVER 440 units at the Jaslovske Bohunice V2 NPP; (iii) Replacement of the technical water distribution system material in the reactor hall of the Temelin VVER 1000 units; Installation of measuring nozzles on main steam piping DN 600 at the Temelin VVER 1000 units. (P.A.)

  12. Experimental Investigation of Operation of VVER Steam Generator in Condensation Mode in the Event of the Severe Accident

    Energy Technology Data Exchange (ETDEWEB)

    Morozov, Andrey [Institute for Physics and Power Engineering by A.I. Leypunsky, 1 Bondarenko sq. Obninsk, 249033 (Russian Federation)

    2008-07-01

    For new Russian nuclear power plants with VVER-1200 reactor in the event of a beyond design basis accident, provision is made for the use of passive safety systems for necessary core cooling. These safety systems include the passive heat removal system (PHRS). In the case of leakage in the primary circuit this system assures the transition of steam generators (SG) to operation in the mode of condensation of the primary circuit steam. As a result, the condensate from SG arrives at the core providing its additional cooling. To investigate the condensation mode of VVER SG operation, a large scale HA2M-SG test facility was constructed. The rig incorporates: buffer tank, SG model with scale is 1:46, PHRS heat exchanger. Experiments at the test facility have been performed to investigate condensation mode of operation of SG model at the pressure 0.4 MPa, correspond to VVER reactor pressure at the last stage of the beyond design basis accident. The report presents the test procedure and the basic obtained test results. (authors)

  13. Thorium utilization in power reactors

    International Nuclear Information System (INIS)

    Saraceno; Marcos.

    1978-10-01

    In this work the recent (prior to Aug, 1976) literature on thorium utilization is reviewed briefly and the available information is updated. After reviewing the nuclear properties relevant to the thorium fuel cycle we describe briefly the reactor systems that have been proposed using thorium as a fertile material. (author) [es

  14. Bottom reflector for power reactors

    International Nuclear Information System (INIS)

    Elter, C.; Kissel, K.F.; Schoening, J.; Schwiers, H.G.

    1982-01-01

    In pebble bed reactors erosion and damage due fuel elements movement on the surface of the bottom reflector should be minimized. This can be achieved by chamfering and/or rounding the cover edges of the graphite blocks and the edges between the drilled holes and the surface of the graphite block. (orig.) [de

  15. Power supply with nuclear reactor

    International Nuclear Information System (INIS)

    Cook, B.M.

    1982-01-01

    Each parameter of the processes of a nuclear reactor and components operatively associated therewith is monitored by a set of four like sensors. A trip system normally operates on a 'two out of four' configuration; i.e., to trip the reactor it is necessary that at least two sensors of a set sense an off-normal parameter. This assumes that all sensors are in normal operating condition. However, when a sensor is in test or is subject to maintenance or is defective or disabled, the 'two out of four' configuration would be reduced to a 'one out of three' configuration because the affected sensor is taken out of service. This would expose the system to the possibility that a single sensor failure, which may be spurious, will cause a trip of the reactor. To prevent this, it is necessary that the affected sensor be bypassed. If only one sensor is bypassed, the system operates on a 'two out of three' configuration. With two sensors bypassed, the sensing of an off-normal parameter by a third sensor trips the reactor

  16. Introduction to the neutron kinetics of nuclear power reactors

    CERN Document Server

    Tyror, J G; Grant, P J

    2013-01-01

    An Introduction to the Neutron Kinetics of Nuclear Power Reactors introduces the reader to the neutron kinetics of nuclear power reactors. Topics covered include the neutron physics of reactor kinetics, feedback effects, water-moderated reactors, fast reactors, and methods of plant control. The reactor transients following faults are also discussed, along with the use of computers in the study of power reactor kinetics. This book is comprised of eight chapters and begins with an overview of the reactor physics characteristics of a nuclear power reactor and their influence on system design and

  17. Parliament votes against building fifth power reactor

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    After a heated three-day debate, Finland's parliament voted on September 24 to reject the proposal to build the country's fifth nuclear power reactor. As predicted, the vote was close: 107 voted against more nuclear power, 90 were in favor, two members of the 200-seat parliament were not present, and the speaker did not vote

  18. Nuclear reactors for space electric power

    International Nuclear Information System (INIS)

    Buden, D.

    1978-06-01

    The Los Alamos Scientific Laboratory is studying reactor power plants for space applications in the late 1980s and 1990s. The study is concentrating on high-temperature, compact, fast reactors that can be coupled with various radiation shielding systems and thermoelectric, dynamic, or thermionic electric power conversion systems, depending on the mission. Lifetimes of 7 to 10 yr at full power, at converter operating temperatures of 1275 to 1675 0 K, are being studied. The systems are being designed such that no single-failure modes exist that will cause a complete loss of power. In fact, to meet the long lifetimes, highly redundant design features are being emphasized. Questions have been raised about safety since the COSMOS 954 incident. ''Fail-safe'' means to prevent exposure of the population to radioactive material, meeting the environmental guidelines established by the U.S. Government have been and continue to be a necessary requirement for any space reactor program. The major safety feature to prevent prelaunch and launch radioactive material hazards is not operating the reactor before achieving the prescribed orbit. Design features in the reactor ensure that accidental criticality cannot occur. High orbits (above 400 to 500 nautical miles) have sufficient lifetimes to allow radioactive elements to decay to safe levels. The major proposed applications for satellites with reactors in Earth orbit are in geosynchronous orbit (19,400 nautical miles). In missions at geosynchronous orbit, where orbital lifetimes are practically indefinite, the safety considerations are negligible. Orbits below 400 to 500 nautical miles are the ones where a safety issue is involved in case of satellite malfunction. The potential missions, the question of why reactors are being considered as a prime power candidate, reactor features, and safety considerations will be discussed

  19. TerraPower, Bill Gates' reactor

    International Nuclear Information System (INIS)

    Guidez, J.

    2016-01-01

    TerraPower is a traveling wave reactor, it means that the reactor gradually converts non fissile material into the fuel it needs and the active part of the core progressively moves through the core leaving spent fuel behind. The last design of the TerraPower shows that it will use depleted uranium as fuel and that its core will need reloading every 10 years. Re-arrangement of the nuclear fuel will have to be made every 18 months to keep the core reactive. Metallic nuclear fuels will be used as they allow the highest breeding rates. It appears that apart from the very specific configuration of the core, the TerraPower is a reactor very similar to sodium-cooled fast reactors. Neutron transport inside traveling wave reactor core is complex and simulations show that the piling-up of fission product tends to kill the chain reaction and a continuous neutron addition may be necessary to keep the reactor going. A large part of the TerraPower feasibility studies concerns neutron transport inside its core. (A.C.)

  20. ANDREA 2.2 and 2.3. Advances in modelling of VVER cores

    Energy Technology Data Exchange (ETDEWEB)

    Havluj, Frantisek; Hejzlar, Jonatan; Vocka, Radim; Vysoudil, Jiri [UJV Rez, Husinec-Rez (Czech Republic)

    2017-09-15

    In 2016 a new version of code ANDREA for core design and reload safety analysis of VVER reactors has been released. The new code version includes several major improvements. The first of them is a seamless incorporation of short time kinetics calculations (without temperature feedback) into the code. This new feature accompanied by the possibility of excore detector signal predictions enables precise interpretation of dynamic measurements of control assembly weight during the reactor startup. Second important enhancement resides in new flexible format of cross section libraries and in new fuel temperature model based on results of TRANSURANUS fuel performance code. The new code version has been thoroughly tested and validated for both VVER440 and VVER-1000 reactors. Furthermore for the new version 2.3 which is to be released shortly we have implemented the possibility of fluent control assemblies' motion and of non-equidistant axial nodalization schemes in VVER-440 calculations.

  1. Gaseous fuel reactors for power systems

    Science.gov (United States)

    Kendall, J. S.; Rodgers, R. J.

    1977-01-01

    Gaseous-fuel nuclear reactors have significant advantages as energy sources for closed-cycle power systems. The advantages arise from the removal of temperature limits associated with conventional reactor fuel elements, the wide variety of methods of extracting energy from fissioning gases, and inherent low fissile and fission product in-core inventory due to continuous fuel reprocessing. Example power cycles and their general performance characteristics are discussed. Efficiencies of gaseous fuel reactor systems are shown to be high with resulting minimal environmental effects. A technical overview of the NASA-funded research program in gaseous fuel reactors is described and results of recent tests of uranium hexafluoride (UF6)-fueled critical assemblies are presented.

  2. Fractional power operation of tokamak reactors

    International Nuclear Information System (INIS)

    Mau, T.K.; Vold, E.L.; Conn, R.W.

    1986-01-01

    Methods to operate a tokamak fusion reactor at fractions of its rated power, identify the more effective control knobs and assess the impact of the requirements of fractional power operation on full power reactor design are explored. In particular, the role of burn control in maintaining the plasma at thermal equilibrium throughout these operations is studied. As a prerequisite to this task, the critical physics issues relevant to reactor performance predictions are examined and some insight into their impact on fractional power operation is offered. The basic tool of analysis consists of a zero-dimensional (0-D) time-dependent plasma power balance code which incorporates the most advanced data base and models in transport and burn plasma physics relevant to tokamaks. Because the plasma power balance is dominated by the transport loss and given the large uncertainty in the confinement model, the authors have studied the problem for a wide range of energy confinement scalings. The results of this analysis form the basis for studying the temporal behavior of the plasma under various thermal control mechanisms. Scenarios of thermally stable full and fractional power operations have been determined for a variety of transport models, with either passive or active feedback burn control. Important power control parameters, such as gas fueling rate, auxiliary power and other plasma quantities that affect transport losses, have also been identified. The results of these studies vary with the individual transport scaling used and, in particular, with respect to the effect of alpha heating power on confinement

  3. Power control device in nuclear reactor

    International Nuclear Information System (INIS)

    Koyama, Kazuaki.

    1981-01-01

    Purpose: To enable smooth power changes in power conditioning systems by calculating forecast values for the neutron flux distribution and power distribution and by controlling the driving speed of control rods so as to correspond the forecast values with aimed values. Constitution: Control rod position is detected by a position detector and sent to a control computer as the position information. At the same time, the neutron flux distribution information is obtained by the neutron monitors, the power distribution information is obtained by a reactor power computer and they are outputted to the control computer. The control computer calculates the forecast values for the neutron flux distribution and the reactor power distribution from the information, and compares them with the aimed values from a setter and then outputs control signals so as to correspond the forecast values with the aimed values. The control rods can be inserted in appropriate velocity by the control signals. (Horiuchi, T.)

  4. The Swedish Zero Power Reactor R0

    Energy Technology Data Exchange (ETDEWEB)

    Landergaard, Olof; Cavallin, Kaj; Jonsson, Georg

    1961-05-15

    The reactor R0 is a critical facility built for heavy water and natural uranium or fuel of low enrichment,, The first criticality was achieved September 25, 1959. During a first period of more than two years the R0 will be operated as a bare reactor in order to simplify interpretation of results. The reactor tank is 3. 2 m high and 2. 25 m in diameter. The fuel suspension system is quite flexible in order to facilitate fuel exchange and lattice variations. The temperature of the water can be varied between about 10 and 90 C by means of a heater and a cooler placed in the external circulating system. The instrumentation of the reactor has to meet the safety requirements not only during operation but also during rearrangements of the core in the shut-down state. Therefore, the shut-down state is always defined by a certain low 'safe' moderator level in the reactor tank. A number of safety rods are normally kept above the moderator ready for action. For manual or automatic control of the reactor power a specially designed piston pump is needed, by which the moderator level is varied. The pump speed is controlled from the reactor power error by means of a Ward-Leonard system. Moderator level measurement is made by means of a water gauge with an accuracy of {+-} 0. 1 mm.

  5. The Swedish Zero Power Reactor R0

    International Nuclear Information System (INIS)

    Landergaard, Olof; Cavallin, Kaj; Jonsson, Georg

    1961-05-01

    The reactor R0 is a critical facility built for heavy water and natural uranium or fuel of low enrichment,, The first criticality was achieved September 25, 1959. During a first period of more than two years the R0 will be operated as a bare reactor in order to simplify interpretation of results. The reactor tank is 3. 2 m high and 2. 25 m in diameter. The fuel suspension system is quite flexible in order to facilitate fuel exchange and lattice variations. The temperature of the water can be varied between about 10 and 90 C by means of a heater and a cooler placed in the external circulating system. The instrumentation of the reactor has to meet the safety requirements not only during operation but also during rearrangements of the core in the shut-down state. Therefore, the shut-down state is always defined by a certain low 'safe' moderator level in the reactor tank. A number of safety rods are normally kept above the moderator ready for action. For manual or automatic control of the reactor power a specially designed piston pump is needed, by which the moderator level is varied. The pump speed is controlled from the reactor power error by means of a Ward-Leonard system. Moderator level measurement is made by means of a water gauge with an accuracy of ± 0. 1 mm

  6. Advances in ICF power reactor design

    International Nuclear Information System (INIS)

    Hogan, W.J.; Kulcinski, G.L.

    1985-01-01

    Fifteen ICF power reactor design studies published since 1980 are reviewed to illuminate the design trends they represent. There is a clear, continuing trend toward making ICF reactors inherently safer and environmentally benign. Since this trend accentuates inherent advantages of ICF reactors, we expect it to be further emphasized in the future. An emphasis on economic competitiveness appears to be a somewhat newer trend. Lower cost of electricity, smaller initial size (and capital cost), and more affordable development paths are three of the issues being addressed with new studies

  7. Containment and surveillance techniques at power reactors

    International Nuclear Information System (INIS)

    Stirling, A.J.

    1982-01-01

    This session will provide participants with an understanding of the functions of safeguards equipment at power reactors, including equipment for fuel accounting, video and film surveillance, diversion monitoring, and containment and surveillance of irradiated fuel in storage. In addition, some appreciation of the impact that reactor safeguards have on the plant operator will be gained. From this, participants will be able to ensure that a reactor safeguards system meets their nation's international and national nonproliferation objectives with a minimum of interference to plant operations

  8. Different types of power reactors and provenness

    International Nuclear Information System (INIS)

    Goodman, E.I.

    1977-01-01

    The lecture guides the potential buyer in the selection of a reactor type. Recommended criteria regarding provenness, licensability, and contractual arrangements are defined and discussed. Tabular data summarizing operating experience and commercial availability of units are presented and discussed. The status of small and medium power reactors which are of interest to many developing countries is presented. It is stressed that each prospective buyer will have to establish his own criteria based on specific conditions which will be applied to reactor selection. In all cases it will be found that selection, either pre-selection of bidders or final selection of supplier, will be a fairly complex evaluation. (orig.) [de

  9. Safety of next generation power reactors

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    This book is organized under the following headings: Future needs of utilities regulators, government, and other energy users, PRA and reliability, LMR concepts, LWR design, Advanced reactor technology, What the industry can deliver: advanced LWRs, High temperature gas-cooled reactors, LMR whole-core experiments, Advanced LWR concepts, LWR technology, Forum: public perceptions, What the industry can deliver: LMRs and HTGRs, Criteria and licensing, LMR modeling, Light water reactor thermal-hydraulics, LMR technology, Working together to revitalize nuclear power, Appendix A, luncheon address, Appendix B, banquet address

  10. Space nuclear reactor power plants

    International Nuclear Information System (INIS)

    Buden, D.; Ranken, W.A.; Koenig, D.R.

    1980-01-01

    Requirements for electrical and propulsion power for space are expected to increase dramatically in the 1980s. Nuclear power is probably the only source for some deep space missions and a major competitor for many orbital missions, especially those at geosynchronous orbit. Because of the potential requirements, a technology program on space nuclear power plant components has been initiated by the Department of Energy. The missions that are foreseen, the current power plant concept, the technology program plan, and early key results are described

  11. Cobalt-60 production in CANDU power reactors

    International Nuclear Information System (INIS)

    Malkoske, G.R.; Norton, J.L.; Slack, J.

    2002-01-01

    MDS Nordion has been supplying cobalt-60 sources to industry for industrial and medical purposes since 1946. These cobalt-60 sources are used in many market and product segments, but are primarily used to sterilize single-use medical products including; surgical kits, gloves, gowns, drapes, and cotton swabs. Other applications include sanitization of cosmetics, microbial reduction of pharmaceutical raw materials, and food irradiation. The technology for producing the cobalt-60 isotope was developed by MDS Nordion and Atomic Energy of Canada Limited (AECL) almost 55 years ago using research reactors at the AECL Chalk River Laboratories in Ontario, Canada. The first cobalt-60 source produced for medical applications was manufactured by MDS Nordion and used in cancer therapy. The benefits of cobalt-60 as applied to medical product manufacturing, were quickly realized and the demand for this radioisotope quickly grew. The same technology for producing cobalt-60 in research reactors was then designed and packaged such that it could be conveniently transferred to a utility/power reactor. In the early 1970's, in co-operation with Ontario Power Generation (formerly Ontario Hydro), bulk cobalt-60 production for industrial irradiation applications was initiated in the four Pickering A CANDU reactors. As the demand and acceptance of sterilization of medical products grew, MDS Nordion expanded its bulk supply by installing the proprietary Canadian technology for producing cobalt-60 in additional CANDU reactors. CANDU is unique among the power reactors of the world, being heavy water moderated and fuelled with natural uranium. They are also designed and supplied with stainless steel adjusters, the primary function of which is to shape the neutron flux to optimize reactor power and fuel bum-up, and to provide excess reactivity needed to overcome xenon-135 poisoning following a reduction of power. The reactor is designed to develop full power output with all of the adjuster

  12. Power Nuclear Reactors: technology and innovation for development in future

    International Nuclear Information System (INIS)

    Suarez Antola, R.

    2009-01-01

    The conference is about some historicals task of the fission technology as well as many types of Nuclear Reactors. Enrichment of fuel, wastes, research reactors and power reactors, a brief advertisment about Uruguay electric siystem and power generation, energetic worldwide, proliferation, safety reactors, incidents, accidents, Three-Mile Island accident, Chernobil accident, damages, risks, classification and description of Power reactors steam generation, nuclear reactor cooling systems, future view

  13. Accounting for the inertia of the thermocouples' measurements by modelling of a NPP Kalinin-3 transient with the coupled system code ATHLET-BIPR-VVER

    International Nuclear Information System (INIS)

    Nikonov, S.; Velkov, K.

    2008-01-01

    The ATHLET-BIPR-VVER coupled system code is applied for performing of safety analysis for different WWER reactors. During the last years its validation matrix is continuously being enlarged. The measurements performed during the commissioning phase of NPP Kalinin Unit 3 for the transient 'Switching-off of one Main Circulation Pump at nominal power' are very well documented and have a variety of recorded integral and local thermo-hydraulic and neutron-physic parameters including the measurements' errors. This data is being used for further validation of the coupled code system ATHLET-BIPR-VVER. In the paper are discussed the problems and our solutions by the correct interpretation of the measured thermocouples' records at NPP Kalinin-3 and the comparison with the predicted results by the coupled thermal-hydraulic/neutron-kinetic code ATHLET-BIPR-VVER. Of primary importance by such comparisons is the correct accounting of the fluid mixing process that take place in the surrounding of the measuring sensors and also the consideration of the time delay (inertia term) of the measuring devices. On the bases of previous experience and many simulations of the defined transient a method is discussed and proposed to consider correctly the inertia term of the thermocouples' measurements. The new modelling is implemented in the coupled system code ATHLET-BIPR-VVER for further validation. (Author)

  14. An inherently safe power reactor module

    International Nuclear Information System (INIS)

    Salerno, L.N.

    1985-01-01

    General Electric's long participation in liquid metal reactor technology has led to a Power Reactor Inherently Safe Module (PRISM) concept supported by DOE contract DE-AC06-85NE37937. The reactor module is sized to maximize inherent safety features. The small size allows factory fabrication, reducing field construction and field QA/QC labor, and allows safety to be demonstrated in full scale, to support a pre-licensed standard commercial product. The module is small enough to be placed underground, and can be combined with steam and electrical generating equipment to provide a complete electrical power producing plant in the range of 400-1200 MWe. Initial assessments are that the concept has the potential to be economically competitive with existing methods of power production used by the utility industry

  15. Corrosion control in CANDU nuclear power reactors

    International Nuclear Information System (INIS)

    Lesurf, J.E.

    1974-01-01

    Corrosion control in CANDU reactors which use pressurized heavy water (PHW) and boiling light water (BLW) coolants is discussed. Discussions are included on pressure tubes, primary water chemistry, fuel sheath oxidation and hydriding, and crud transport. It is noted that corrosion has not been a significant problem in CANDU nuclear power reactors which is a tribute to design, material selection, and chemistry control. This is particularly notable at the Pickering Nuclear Generating Station which will have four CANDU-PHW reactors of 540 MWe each. The net capacity factor for Pickering-I from first full power (May 1971) to March 1972 was 79.5 percent, and for Pickering II (first full power November 1971) to March 1972 was 83.5 percent. Pickering III has just reached full power operation (May 1972) and Pickering IV is still under construction. Gentilly CANDU-BLW reached full power operation in May 1972 after extensive commissioning tests at lower power levels with no major corrosion or chemistry problems appearing. Experience and operating data confirm that the value of careful attention to all aspects of corrosion control and augur well for future CANDU reactors. (U.S.)

  16. Reactors of different types in the world nuclear power

    International Nuclear Information System (INIS)

    Simonov, K.V.

    1991-01-01

    The status of the world nuclear power is briefly reviewed. It is noted that PWR reactors have decisive significance in the world power. The second place is related to gas-cooled graphite-moderated reactors. Channel-type heavy water moderated reactors are relatively important. Nuclear power future is associated with fast liquid-metal cooled breeder reactors

  17. VVER-1000 dominance ratio

    International Nuclear Information System (INIS)

    Gorodkov, S.

    2009-01-01

    Dominance ratio, or more precisely, its closeness to unity, is important characteristic of large reactor. It allows evaluate beforehand the number of source iterations required in deterministic calculations of power spatial distribution. Or the minimal number of histories to be modeled for achievement of statistical error level desired in large core Monte Carlo calculations. In this work relatively simple approach for dominance ratio evaluation is proposed. It essentially uses core symmetry. Dependence of dominance ratio on neutron flux spatial distribution is demonstrated. (author)

  18. Thorium fuel for light water reactors - reducing proliferation potential of nuclear power fuel cycle

    Energy Technology Data Exchange (ETDEWEB)

    Galperin, A; Radkowski, A [Ben-Gurion Univ. of the Negev, Beersheba (Israel)

    1996-12-01

    The proliferation potential of the light water reactor fuel cycle may be significantly reduced by utilization of thorium as a fertile component of the nuclear fuel. The main challenge of Th utilization is to design a core and a fuel cycle, which would be proliferation-resistant and economically feasible. This challenge is met by the Radkowsky Thorium Reactor (RTR) concept. So far the concept has been applied to a Russian design of a 1,000 MWe pressurized water reactor, known as a WWER-1000, and designated as VVERT. The following are the main results of the preliminary reference design: * The amount of Pu contained in the RTR spent fuel stockpile is reduced by 80% in comparison with a VVER of a current design. * The isotopic composition of the RTR-Pu greatly increases the probability of pre-initiation and yield degradation of a nuclear explosion. An extremely large Pu-238 content causes correspondingly large heat emission, which would complicate the design of an explosive device based on RTR-Pu. The economic incentive to reprocess and reuse the fissile component of the RTR spent fuel is decreased. The once-through cycle is economically optimal for the RTR core and cycle. To summarize all the items above: the replacement of a standard (U-based) fuel for nuclear reactors of current generation by the RTR fuel will provide an inherent barrier for nuclear weapon proliferation. This inherent barrier, in combination with existing safeguard measures and procedures is adequate to unambiguously disassociate civilian nuclear power from military nuclear power. * The RTR concept is applied to existing power plants to assure its economic feasibility. Reductions in waste disposal requirements, as well as in natural U and fabrication expenses, as compared to a standard WWER fuel, provide approximately 20% reduction in fuel cycle (authors).

  19. Analytical validation of operator actions in case of primary to secondary leakage for VVER-1000/V320

    Energy Technology Data Exchange (ETDEWEB)

    Andreeva, M., E-mail: m_andreeva@inrne.bas.bg; Groudev, P., E-mail: pavlinpg@inrne.bas.bg; Pavlova, M., E-mail: pavlova@inrne.bas.bg

    2015-12-15

    Highlights: • We validate operator actions in case of primary to secondary leakage. • We perform four scenarios related to SGTR accident for VVER-1000/V320. • The reference power plant for the analyses is Unit 6 at Kozloduy NPP. • The RELAP5/MOD 3.2 computer code is used in performing the analyses. • The analyses confirm the effectiveness of operator actions during PRISE. - Abstract: This paper presents the results of analytical validation of operator actions in case of “Steam Generator Tube Rupture” (SGTR) for VVER-1000/V320 units at Kozloduy Nuclear Power Plant (KNPP), done during the development of Symptom Based Emergency Operating Procedures (SB EOPs) for this plant. The purpose of the analyses is to demonstrate the ability to terminate primary to secondary leakage and to indicate an effective strategy for preventing secondary leakage to the environment and in this way to prevent radiological release to the environment. Following depressurization and cooldown of reactor coolant system (RCS) with isolation of the affected steam generator (SG), in these analyses are validated options for post-SGTR cooldown by: • back up filling the ruptured SG; • using letdown system in the affected SG and • by opening Fast Acting Isolation Valve (FAIV) and using Steam Dump Facility to the Condenser (BRU-K). The results of the thermal-hydraulic analyses have been used to assist KNPP specialists in analytical validation of EOPs. The RELAP5/MOD3.2 computer code has been used for the analyses in a VVER-1000 Nuclear Power Plant (NPP) model. A model of VVER-1000 based on Unit 6 of Kozloduy NPP has been developed for the thermal-hydraulics code RELAP5/MOD3.2 at the Institute for Nuclear Research and Nuclear Energy – Bulgarian Academy of Sciences (INRNE-BAS). This paper is possible through the participation of leading specialists from KNPP.

  20. Power reactor events, May-June 1986

    International Nuclear Information System (INIS)

    Massaro, S.A.

    1986-12-01

    Power Reactor Events is a bi-monthly newsletter that compiles operating experience information about commercial nuclear power plants. This includes summaries of noteworthy events and listings and/or abstracts of USNRC and other documents that discuss safety-related or possible generic issues. It is intended to feed back some of the lessons learned from operational experience to the various plant personnel, i.e., managers, licensed reactor operators, training coordinators, and support personnel. Events at the following plants are reported: McGuire Unit 1; Susquehanna Units 1 and 2; Browns Ferry Units 1, 2, and 3; and River Bend Unit 1

  1. Time-optimal control of reactor power

    International Nuclear Information System (INIS)

    Bernard, J.A.

    1987-01-01

    Control laws that permit adjustments in reactor power to be made in minimum time and without overshoot have been formulated and demonstrated. These control laws which are derived from the standard and alternate dynamic period equations, are closed-form expressions of general applicability. These laws were deduced by noting that if a system is subject to one or more operating constraints, then the time-optimal response is to move the system along these constraints. Given that nuclear reactors are subject to limitations on the allowed reactor period, a time-optimal control law would step the period from infinity to the minimum allowed value, hold the period at that value for the duration of the transient, and then step the period back to infinity. The change in reactor would therefore be accomplished in minimum time. The resulting control laws are superior to other forms of time-optimal control because they are general-purpose, closed-form expressions that are both mathematically tractable and readily implanted. Moreover, these laws include provisions for the use of feedback. The results of simulation studies and actual experiments on the 5 MWt MIT Research Reactor in which these time-optimal control laws were used successfully to adjust the reactor power are presented

  2. Nuclear Power Reactor simulator - based training program

    International Nuclear Information System (INIS)

    Abdelwahab, S.A.S.

    2009-01-01

    nuclear power stations will continue playing a major role as an energy source for electric generation and heat production in the world. in this paper, a nuclear power reactor simulator- based training program will be presented . this program is designed to aid in training of the reactor operators about the principles of operation of the plant. also it could help the researchers and the designers to analyze and to estimate the performance of the nuclear reactors and facilitate further studies for selection of the proper controller and its optimization process as it is difficult and time consuming to do all experiments in the real nuclear environment.this program is written in MATLAB code as MATLAB software provides sophisticated tools comparable to those in other software such as visual basic for the creation of graphical user interface (GUI). moreover MATLAB is available for all major operating systems. the used SIMULINK reactor model for the nuclear reactor can be used to model different types by adopting appropriate parameters. the model of each component of the reactor is based on physical laws rather than the use of look up tables or curve fitting.this simulation based training program will improve acquisition and retention knowledge also trainee will learn faster and will have better attitude

  3. Reactor power system deployment and startup

    International Nuclear Information System (INIS)

    Wetch, J.R.; Nelin, C.J.; Britt, E.J.; Klein, G.; Rasor Associates, Inc., Sunnyvale, CA; California Institute of Technology, Pasadena)

    1985-01-01

    This paper addresses issues that should receive further examination in the near-term as concept selection for development of a U.S. space reactor power system is approached. The issues include: the economics, practicality and system reliability associated with transfer of nuclear spacecraft from low earth shuttle orbits to operational orbits, via chemical propulsion versus nuclear electric propulsion; possible astronaut supervised reactor and nuclear electric propulsion startup in low altitude Shuttle orbit; potential deployment methods for nuclear powered spacecraft from Shuttle; the general public safety of low altitude startup and nuclear safe and disposal orbits; the question of preferred reactor power level; and the question of frozen versus molten alkali metal coolant during launch and deployment. These issues must be considered now because they impact the SP-100 concept selection, power level selection, weight and size limits, use of deployable radiators, reliability requirements, and economics, as well as the degree of need for and the urgency of developing space reactor power systems. 5 references

  4. Water chemistry experiences with VVERs at Kudankulam

    International Nuclear Information System (INIS)

    Rout, D.; Upadhyaya, T.C.; Ravindranath; Selvinayagam, P.; Sundar, R.S.

    2015-01-01

    Kudankulam Nuclear Power Project - 1 and 2 (Kudankulam NPP - 1 and 2) are pressurised water cooled VVERs of 1000 MWe each. Kudankulam NPP Unit - 1 is presently on its first cycle of operation and Kudankulam NPP Unit - 2 is on the advanced stage of commissioning with the successful completion of hot run related Functional tests. Water Chemistry aspects during various phases of commissioning of Kudankulam NPP Unit - 1 such as Hot Run, Boric acid flushing, initial fuel Loading (IFL), First approach to Criticality (FAC) are discussed. The main objectives of the use of controlled primary water chemistry programme during the hot functional tests are reviewed. The importance of the relevant water chemistry parameters were ensured to have the quality of the passive layer formed on the primary coolant system surfaces. The operational experiences during the 1 st cycle of operation of primary water chemistry, radioactivity transport and build-up are presented. The operational experience of some VVER units in the field of the primary water chemistry, radioactivity transport and build-up are presented as a comparison to VVER at Kudankulam NPP. The effects of the initial passivated layer formed on metal surfaces during hot run, activated corrosion products levels in the primary coolant under controlled water chemistry regime and the contamination/radiation situation are discussed. This report also includes the water chemistry related issues of secondary water systems. (author)

  5. Power Reactor Thoria Reprocessing Facility (PRTRF), Trombay

    International Nuclear Information System (INIS)

    Dhami, P.S; Yadav, J.S; Agarwal, K.

    2017-01-01

    Exploitation of the abundant thorium resources to meet sustained energy demand forms the basis of the Indian nuclear energy programme. To gain reprocessing experience in thorium fuel cycle, thoria was irradiated in research reactor CIRUS in early sixties. Later in eighties, thoria bundles were used for initial flux flattening in some of the pressurized heavy water reactors (PHWRs). The research reactor irradiated thoria contained small content (∼ 2-3ppm) of "2"3"2U in "2"3"3U product, which did not pose any significant radiological problems during processing in Uranium Thorium Separation Facility (UTSF), Trombay. Thoria irradiated in PHWRs on discharge contained (∼ 0.5-1.5% "2"3"3U with significant "2"3"2U content (100-500 ppm) requiring special radiological attention. Based on the experience from UTSF, a new facility viz. Power Reactor Thoria Reprocessing Facility (PRTRF), Trombay was built which was hot commissioned in the year 2015

  6. Power control device for nuclear reactors

    International Nuclear Information System (INIS)

    Kagawa, Tatsuo

    1984-01-01

    Purpose: To eliminate for requirement of control rods and movable portions, as well as ensure the safety and reliability of the operation. Constitution: A plurality of control tubes are disposed within a reactor core instead of control rods. Tubes are connected from below the reactor core to the control tubes for supplying liquid poisons such as aqueous boric acid to the inside of the control tubes. Further, tubes are connected to the upper portion of the control tubes for guiding the liquid poisons from the reactor core to the outside. The tubes for supplying and discharging the liquid poisons are introduced externally through the flange disposed at the upper portion of a pressure vessel. At the outside of the pressure vessel, are disposed a liquid poison tank, a pressurizing source, a pressure control valve, a liquid level meter and the like. The control for the reactor power is conducted by controlling the level of the liquid poisons in the control tubes. (Ikeda, J.)

  7. Investigation of circulating temperature fluctuations of the primary coolant in order to develop an enhanced MTC estimator for VVER-440 reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kiss, Sandor; Lipcsei, Sandor [Hungarian Academy of Sciences, Budapest (Hungary). Centre for Energy Research - MTA

    2017-09-15

    Our aim was to develop a method based on noise diagnostics for the estimation of the moderator temperature coefficient of reactivity (MTC) for the Paks VVER-440 units in normal operation. The method requires determining core average neutron flux and temperature fluctuations. The circulation period of the primary coolant, transfer properties of the steam generators, as well as the source and the propagation of the temperature perturbations and the proportions of the perturbation components were investigated in order to estimate the feedback caused by the circulation of the primary coolant. Finally, after developing the new MTC estimator, determining its frequency range and optimal parameters, trends were produced based on an overall evaluation of measurements made with standard instrumentation during a one-year-long period at Paks NPP.

  8. Radiation streaming in power reactors. [PWR; BWR

    Energy Technology Data Exchange (ETDEWEB)

    Lahti, G.P.; Lee, R.R.; Courtney, J.C. (eds.)

    1979-02-01

    Separate abstracts are included for each of the 14 papers given at a special session on Radiation Streaming in Power Reactors held on November 15 at the American Nuclear Society 1978 Winter Meeting in Washington, D.C. The papers describe the methods of calculation, the engineering of shields, and the measurement of radiation environments within the containments of light water power reactors. Comparisons of measured and calculated data are used to determine the accuracy of computer predictions of the radiation environment. Specific computational and measurement techniques are described and evaluated. Emphasis is on radiation streaming in the annular region between the reactor vesel and the primary shield and its resultant environment within the primary containment.

  9. High Flux Isotope Reactor power upgrade status

    International Nuclear Information System (INIS)

    Rothrock, R.B.; Hale, R.E.; Cheverton, R.D.

    1997-01-01

    A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions

  10. The IAEA power reactor information system - PRIS

    International Nuclear Information System (INIS)

    Laue, H.J.; Qureshi, A.; Skjoeldebrand, R.; White, D.

    1983-01-01

    The IAEA Power Reactor Information System, PRIS, is based on a collection of basic design data and operating experience data which the IAEA started in 1970. PRIS is used for annual publications on 'Power Reactors in Member States', 'Operating Experience with Nuclear Power Stations in Member States', which gives annual operating information for individual plants, and a 'Performance Analysis Report' summarizing each year's and earlier experience. Since 1973 information has been collected in a systematic manner on significant plant outages (= more than 10 full power hours). There is now information on more than 10,000 outages in the system which permits some conclusions to be drawn both in regard to individual plants and to categories of plants on the significance of different outage reasons and different types of equipment failures. PRIS has not been intended to be a component reliability information system as an international data collection must stop short of the level of detail which would be needed for that purpose. The objectives of PRIS have been to provide a factual background for assumptions on parameters which are essential for economic evaluations and for systems operation planning (load factor and availability). The outage information does, however, lend itself to conclusions about generic problems in different categories of plants and it can be used by an individual operator to find other plants where information about particular problems can be obtained. It would also now be possible to use PRIS for setting availability goals based on experience and not only on theoretical design considerations. The paper demonstrates the conclusions which can be drawn from 662 reactor years of operation of light and heavy water pressurized reactors and 390 reactor years of boiling water reactors and, in particular, the role that the main heat removal system and its components have played in the equipment failure category

  11. State system experience with safeguarding power reactors

    International Nuclear Information System (INIS)

    Roehnsch, W.

    1982-01-01

    This session describes the development and operation of the State System of Accountancy and Control in the German Democratic Republic, and summarizes operating experience with safeguards at power reactor facilities. Overall organization and responsibilities, containment and surveillance measures, materials accounting, and inspection procedures will be outlined. Cooperation between the IAEA, State system, facility, and supplier authorities will also be addressed

  12. The program of reactors and nuclear power plants

    International Nuclear Information System (INIS)

    Calabrese, Carlos R.

    2001-01-01

    Into de framework of the program of research reactors and nuclear power plants, the operating Argentine reactors are described. The uses of the research reactors in Argentina are summarized. The reactors installed by Argentina in other countries (Peru, Algeria, Egypt) are briefly described. The CAREM project for the design and construction of an innovator small power reactor (27 MWe) is also described in some detail. The next biennial research and development program for reactor is briefly outlined

  13. Correlations between power and test reactor data bases

    International Nuclear Information System (INIS)

    Guthrie, G.L.; Simonen, E.P.

    1989-02-01

    Differences between power reactor and test reactor data bases have been evaluated. Charpy shift data has been assembled from specimens irradiated in both high-flux test reactors and low-flux power reactors. Preliminary tests for the existence of a bias between test and power reactor data bases indicate a possible bias between the weld data bases. The bias is nonconservative for power predictive purposes, using test reactor data. The lesser shift for test reactor data compared to power reactor data is interpreted primarily in terms of greater point defect recombination for test reactor fluxes compared to power reactor fluxes. The possibility of greater thermal aging effects during lower damage rates is also discussed. 15 refs., 5 figs., 2 tabs

  14. Monitoring device for the reactor power distribution

    International Nuclear Information System (INIS)

    Uematsu, Hitoshi; Tsuiki, Makoto

    1982-01-01

    Purpose: To enable accurate monitoring for the power distribution in a short time, as well as independent detection for in-core neutron flux detectors in abnormal operation due to failures or like other causes to thereby surely provide reliable substitute values. Constitution: Counted values are inputted from a reactor core present status data detector by a power distribution calculation device to calculate the in-core neutron flux density and the power distribution based on previously stored physical models. While on the other hand, counted value from the in-core neutron detectors and the neutron flux distribution and the power distribution calculated from the power distribution calculation device are inputted from a BCF calculation device to compensate the counting errors incorporated in the counted value from the in-core neutron flux detectors and the calculation errors incorporated in the power distribution calculated in the power distribution calculation device respectively and thereby calculate the power distribution in the reactor core. Further, necessary data are inputted to the power distribution calculation device by an input/output device and the results calculated in the BCF calculation device are displayed. (Aizawa, K.)

  15. French-Finnish colloquium on safety of French and Russian type nuclear power plants

    International Nuclear Information System (INIS)

    Lukka, M.; Jaervinen, M.; Minkkinen, P.; Ukkola, A.; Levomaeki, L.

    1994-01-01

    The French-Finnish Colloquium on Safety of French and Russian Type Nuclear Power Plants was held in June, 14th - 16th, 1994, in Lappeenranta, Finland. The main topics of the colloquium were: VVER and RBMK reactors; Industrial safety studies for VVER's in FRAMATOME; Structural safety analysis of Ignalina NPP; Thermalhydraulic system (BETHSY) and analytical experiments for French NPP; Test facilities simulating VVER plants during accidents; PACTEL - facility for VVER thermal hydraulics; High burn-up fuel and reactivity accidents; Overview of severe accident research at Nuclear Protection and Safety Institute of CEA; Research of severe accidents in Finland; Review of main activities concerning computer codes used for VVER thermal-hydraulic safety analysis in OKB Gidropress; CATHARE code; APROS computer code, new developments; TRIO and TOLBIAC computer codes; ESTET and N3S softwares; HEXTRAN - 3D reactor dynamics code for VVER accident analysis; An overview the boron dilution issue in PWRs; Boron mixing transients in a 900 MW PWR vessel for a reactor start-up operation; and Problem of boric acid dilution in IVO

  16. Assessment of the thorium fuel cycle in power reactors

    International Nuclear Information System (INIS)

    Kasten, P.R.; Homan, F.J.; Allen, E.J.

    1977-01-01

    A study was conducted at Oak Ridge National Laboratory to evaluate the role of thorium fuel cycles in power reactors. Three thermal reactor systems were considered: Light Water Reactors (LWRs); High-Temperature Gas-Cooled Reactors (HTGRs); and Heavy Water Reactors (HWRs) of the Canadian Deuterium Uranium Reactor (CANDU) type; most of the effort was on these systems. A summary comparing thorium and uranium fuel cycles in Fast Breeder Reactors (FBRs) was also compiled

  17. Self-powered detectors for power reactors: an overview

    International Nuclear Information System (INIS)

    Ma, J.

    2006-01-01

    In this paper, Self-Powered Detectors (SPDs) for applications in nuclear power reactors have been reviewed. Based on their responses to radiation, these detectors can be divided into delayed response Self-Powered Neutron Detector (SPND), prompt response SPND and Self-Powered Gamma Detector (SPGD). The operational principles of these detectors are presented and their distinctive characteristics are examined accordingly. The analytical models and Monte Carlo method to calculate the responses of these detectors to neutron flux and external gamma rays are reviewed. The paper has also considered some related signal processing techniques, such as detector calibrations and detector signal compensations. Furthermore, a couple of failure modes have also been analyzed. Finally, applications of SPD in nuclear power reactors are summarized. (author)

  18. Self-powered detectors for power reactors: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Ma, J. [Univ. of Western Ontario, Dept. of Mechanical and Materials Engineering, London, Ontario (Canada)]. E-mail: jma64@uwo.ca

    2006-07-01

    In this paper, Self-Powered Detectors (SPDs) for applications in nuclear power reactors have been reviewed. Based on their responses to radiation, these detectors can be divided into delayed response Self-Powered Neutron Detector (SPND), prompt response SPND and Self-Powered Gamma Detector (SPGD). The operational principles of these detectors are presented and their distinctive characteristics are examined accordingly. The analytical models and Monte Carlo method to calculate the responses of these detectors to neutron flux and external gamma rays are reviewed. The paper has also considered some related signal processing techniques, such as detector calibrations and detector signal compensations. Furthermore, a couple of failure modes have also been analyzed. Finally, applications of SPD in nuclear power reactors are summarized. (author)

  19. Transients in reactors for power systems compensation

    Science.gov (United States)

    Abdul Hamid, Haziah

    This thesis describes new models and investigations into switching transient phenomena related to the shunt reactors and the Mechanically Switched Capacitor with Damping Network (MSCDN) operations used for reactive power control in the transmission system. Shunt reactors and MSCDN are similar in that they have reactors. A shunt reactor is connected parallel to the compensated lines to absorb the leading current, whereas the MSCDN is a version of a capacitor bank designed as a C-type filter for use in the harmonic-rich environment. In this work, models have been developed and transient overvoltages due to shunt reactor deenergisation were estimated analytically using MathCad, a mathematical program. Computer simulations used the ATP/EMTP program to reproduce both single-phase and three-phase shunt reactor switching at 275 kV operational substations. The effect of the reactor switching on the circuit breaker grading capacitor was also examined by considering various switching conditions.. The main original achievement of this thesis is the clarification of failure mechanisms occurring in the air-core filter reactor due to MSCDN switching operations. The simulation of the MSCDN energisation was conducted using the ATP/EMTP program in the presence of surge arresters. The outcome of this simulation shows that extremely fast transients were established across the air-core filter reactor. This identified transient event has led to the development of a detailed air-core reactor model, which accounts for the inter-turn RLC parameters as well as the stray capacitances-to-ground. These parameters are incorporated into the transient simulation circuit, from which the current and voltage distribution across the winding were derived using electric field and equivalent circuit modelling. Analysis of the results has revealed that there are substantial dielectric stresses imposed on the winding insulation that can be attributed to a combination of three factors. (i) First, the

  20. Main results of post-irradiation examinations of new-generation fuel assemblies VVER-1000

    International Nuclear Information System (INIS)

    Zvir, E.; Markov, D.; Polenok, V.; Zhitelev, V.; Kobylyansky, G.

    2009-01-01

    To increase the competitiveness of Russian nuclear fuel at the foreign market and to improve its technical and economic performance in order to provide a necessary level of safety, it is necessary to solve certain important tasks: Increase of fuel burn-up; Extension of operational lifetime of fuel assemblies and operational reliability of nuclear fuel; Introduction of cost-beneficial and flexible fuel cycles. Alternative fuel assemblies TVSA VVER-1000 and TVS-2 are used as a basis to optimize the nuclear fuel and develop advanced fuel cycles for nuclear power plants with VVER-1000 reactor types. Four fuel assemblies TVSA operated during 1 and up to 6 reactor cycles, reference fuel assembly TVS-2 operated during three reactor cycles and achieved an average fuel burnup of 48MW·day/kgU as well as failed fuel assembly TVS-2 operated during one cycle were examined at RIAR in recent years. The main objectives of these examinations were to obtain experimental data in support of operational integrity of products or to find out reasons of their failure. The performed post-irradiation examinations confirmed the operational integrity of alternative fuel assemblies TVSA including their geometrical stability up to the average fuel burnup of 55 MW·day/kgU over the fuel assembly (FA) (up to the maximal fuel burnup of ∼73 MW·day/kgU in fuel rods) and of TVS-2 up to the average fuel burnup of 48 MW·day/kgU over the fuel assembly. The changes introduced in the design of VVER-1000 fuel assembly during the development of alternative fuel assembly TVSA and TVS-2 did not make any negative effect on fuel rods. It was proved that causes of fuel rod failure were not related to design features of fuel assemblies. The design features and operating conditions of fuel assemblies under examinations are briefly described. Post-irradiation examinations proved the geometrical stability of fuel assemblies TVSA and TVS-2 under operation up to the fuel burnup of ∼50 MW day/kgU, as for the

  1. Possible pressurized thermal shock events during large primary to secondary leakage. The Hungarian AGNES project and PRISE accident scenarios in VVER-440/V213 type reactor

    Energy Technology Data Exchange (ETDEWEB)

    Perneczky, L. [KFKI Atomic Energy Research Inst., Budabest (Hungary)

    1997-12-31

    Nuclear power plants of WWER-440/213-type have several special features. Consequently, the transient behaviour of such a reactor system should be different from the behaviour of the PWRs of western design. The opening of the steam generator (SG) collector cover, as a specific primary to secondary circuit leakage (PRISE) occurring in WWER-type reactors happened first time in Rovno NPP Unit I on January 22, 1982. Similar accident was studied in the framework of IAEA project RER/9/004 in 1987-88 using the RELAP4/mod6 code. The Hungarian AGNES (Advanced General and New Evaluation of Safety) project was performed in the period 1991-94 with the aim to reassess the safety of the Paks NPP using state-of-the-art techniques. The project comprised three type of analyses for the primary to secondary circuit leakages: Design Basis Accident (DBA) analyses, Pressurized Thermal Shock (PTS) study and deterministic analyses for Probabilistic Safety Analysis (PSA). Major part of the thermohydraulic analyses has been performed by the RELAP5/mod2.5/V251 code version with two input models. 32 refs.

  2. Possible pressurized thermal shock events during large primary to secondary leakage. The Hungarian AGNES project and PRISE accident scenarios in VVER-440/V213 type reactor

    Energy Technology Data Exchange (ETDEWEB)

    Perneczky, L [KFKI Atomic Energy Research Inst., Budabest (Hungary)

    1998-12-31

    Nuclear power plants of WWER-440/213-type have several special features. Consequently, the transient behaviour of such a reactor system should be different from the behaviour of the PWRs of western design. The opening of the steam generator (SG) collector cover, as a specific primary to secondary circuit leakage (PRISE) occurring in WWER-type reactors happened first time in Rovno NPP Unit I on January 22, 1982. Similar accident was studied in the framework of IAEA project RER/9/004 in 1987-88 using the RELAP4/mod6 code. The Hungarian AGNES (Advanced General and New Evaluation of Safety) project was performed in the period 1991-94 with the aim to reassess the safety of the Paks NPP using state-of-the-art techniques. The project comprised three type of analyses for the primary to secondary circuit leakages: Design Basis Accident (DBA) analyses, Pressurized Thermal Shock (PTS) study and deterministic analyses for Probabilistic Safety Analysis (PSA). Major part of the thermohydraulic analyses has been performed by the RELAP5/mod2.5/V251 code version with two input models. 32 refs.

  3. Method of estimating the reactor power distribution

    International Nuclear Information System (INIS)

    Mitsuta, Toru; Fukuzaki, Takaharu; Doi, Kazuyori; Kiguchi, Takashi.

    1984-01-01

    Purpose: To improve the calculation accuracy for the power distribution thereby improve the reliability of power distribution monitor. Constitution: In detector containing strings disposed within a reactor core, movable type neutron flux monitors are provided in addition to position fixed type neutron monitors conventionally disposed so far. Upon periodical monitoring, a power distribution X1 is calculated from a physical reactor core model. Then, a higher power position X2 is detected by position detectors and value X2 is sent to a neutron flux monitor driving device to displace the movable type monitors to a higher power position in each of the strings. After displacement, the value X1 is amended by an amending device using measured values from the movable type and fixed type monitors and the amended value is sent to a reactor core monitor device. Upon failure of the fixed type monitors, the position is sent to the monitor driving device and the movable monitors are displaced to that position for measurement. (Sekiya, K.)

  4. Reactor power distribution pattern judging device

    International Nuclear Information System (INIS)

    Ikehara, Tadashi.

    1992-01-01

    The judging device of the present invention comprises a power distribution readout system for intaking a power value from a fuel segment, a neural network having an experience learning function for receiving a power distribution value as an input variant, mapping it into a desirable property and self-organizing the map, and a learning date base storing a plurality of learnt samples. The read power distribution is classified depending on the similarity thereof with any one of representative learnt power distribution, and the corresponding state of the reactor core is outputted as a result of the judgement. When an error is found in the classified judging operation, erroneous cases are additionally learnt by using the experience and learning function, thereby improving the accuracy of the reactor core characteristic estimation operation. Since the device is mainly based on the neural network having a self-learning function and a pattern classification and judging function, a judging device having a human's intuitive pattern recognition performance and a pattern experience and learning performance is obtainable, thereby enabling to judge the state of the reactor core accurately. (N.H.)

  5. Experimental development of power reactor intelligent control

    International Nuclear Information System (INIS)

    Edwards, R.M.; Garcia, H.E.; Lee, K.Y.

    1992-01-01

    The US nuclear utility industry initiated an ambitious program to modernize the control systems at a minimum of ten existing nuclear power plants by the year 2000. That program addresses urgent needs to replace obsolete instrumentation and analog controls with highly reliable state-of-the-art computer-based digital systems. Large increases in functionality that could theoretically be achieved in a distributed digital control system are not an initial priority in the industry program but could be logically considered in later phases. This paper discusses the initial development of an experimental sequence for developing, testing, and verifying intelligent fault-accommodating control for commercial nuclear power plant application. The sequence includes an ultra-safe university research reactor (TRIGA) and a passively safe experimental power plant (Experimental Breeder Reactor 2)

  6. Analysis of transients for NPP with VVER-440 using the code SiTAP

    International Nuclear Information System (INIS)

    Kalinenko, V.

    1994-06-01

    The report contains analysis of transients ''Loop connection'' and ''Steam generator tube rupture'' for nuclear power plants (NPP) with VVER-440. To obtain more detailed information about NPP's dynamic characteristics, various variants of initial and boundary conditions are considerd. Calculation of these transients was performed using the SiTAP code developed at the Nuclear Safety Institute of the Russian Research Centre ''Kurchatov Institute''. SiTAP code is a multifunctional computer tool for fast analysis of transient and accidental processes of VVER type reactors for engineers working in the field of NPP dynamics. SiTAP can be used form comparative analysis of several variants of accident scenarios to find out the conditions leading to most serious consequences from a safety point of view. In such cases, additional analyses using best-estimate codes should be carried out. The results of SiTAP for a faulty loop connection leading to a boron dilution accident are intended to be used as boundary conditions for a more detailed anlaysis with the aid of the three-dimensional reactor core model DYN3D, developed in the Research Centre Rossendorf for the simulation of reactivity initiated accidents. (orig.)

  7. Experimental study of asymmetric boron dilution at VVER-1000 of Kudankulam NPP and its simulation

    Energy Technology Data Exchange (ETDEWEB)

    Tsyganov, Sergey V.; Kotsarev, Alexander V.; Baykov, Alexander V. [National Research Centre ' ' Kurchatov Institute' ' , Moscow (Russian Federation)

    2017-09-15

    The Kudankulam NPP units contain additional and unique for VVER Quick Boron Injection System (QBIS) for beyond-design-basis accident management without scram. During the physical start-up stage at hot zero power of both Kudankulam units, special tests were performed to assess the efficiency of the system. In the course of test three out of four QBIS tanks had been promptly opened and it led to the asymmetrical injection of boric acid into the core. The scenario of the tests may address to the inhomogeneous boron dilution process that is now an essential part of safety analysis of pressurised water reactors. The simulation of the process, including ex-core ion chambers readings, has been accomplished using ATHLET/BIPR-VVER code. Behaviour of some reactor parameters in the course of the test and some results of the simulation are discussing in the paper. Authors believe the process of the asymmetrical injection of boric acid may be useful for verification and validation of coupled neutronic and thermo-hydraulic codes widely used for safety analysis, including analysis of boron dilution accident.

  8. The program of reactors and nuclear power plants; Programa de reactores y centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Calabrese, Carlos R [Comision Nacional de Energia Atomica, General San Martin (Argentina). Centro Atomico Constituyentes

    2001-07-01

    Into de framework of the program of research reactors and nuclear power plants, the operating Argentine reactors are described. The uses of the research reactors in Argentina are summarized. The reactors installed by Argentina in other countries (Peru, Algeria, Egypt) are briefly described. The CAREM project for the design and construction of an innovator small power reactor (27 MWe) is also described in some detail. The next biennial research and development program for reactor is briefly outlined.

  9. Tandem mirror reactor power balance studies

    International Nuclear Information System (INIS)

    Gorker, G.E.; Perkins, L.J.

    1985-01-01

    A tandem mirror reactor (TMR) power plant balance model has been developed and is now being used as a computer aid for performing parametric studies. End-cell power injection into the plasma and the physics thermal Q are used to determine the fusion power. About 80% of the fusion power is transferred by high-energy neutrons to the blanket modules and structures. The other 20% of the fusion power in the high-energy alpha particles is used to heat the deuterium-tritium (D-T) plasma. Most of the plasma-ionized particles transfer their energy to the halo dumps and direct converters. The plant efficiency is calculated for three different system cycles: (1) the pressurized water/saturated steam cycle; (2) the superheated steam cycle; and (3) the more complex superheat/reheat cycle. There is a signficiant improvement in plant efficiency as the electrical power multiplication factor and steam cycle efficiency increases

  10. TRIGA research reactors with higher power density

    International Nuclear Information System (INIS)

    Whittemore, W.L.

    1994-01-01

    The recent trend in new or upgraded research reactors is to higher power densities (hence higher neutron flux levels) but not necessarily to higher power levels. The TRIGA LEU fuel with burnable poison is available in small diameter fuel rods capable of high power per rod (≅48 kW/rod) with acceptable peak fuel temperatures. The performance of a 10-MW research reactor with a compact core of hexagonal TRIGA fuel clusters has been calculated in detail. With its light water coolant, beryllium and D 2 O reflector regions, this reactor can provide in-core experiments with thermal fluxes in excess of 3 x 10 14 n/cm 2 ·s and fast fluxes (>0.1 MeV) of 2 x 10 14 n/cm 2 ·s. The core centerline thermal neutron flux in the D 2 O reflector is about 2 x 10 14 n/cm 2 ·s and the average core power density is about 230 kW/liter. Using other TRIGA fuel developed for 25-MW test reactors but arranged in hexagonal arrays, power densities in excess of 300 kW/liter are readily available. A core with TRIGA fuel operating at 15-MW and generating such a power density is capable of producing thermal neutron fluxes in a D 2 O reflector of 3 x 10 14 n/cm 2 ·s. A beryllium-filled central region of the core can further enhance the core leakage and hence the neutron flux in the reflector. (author)

  11. In core system mapping reactor power distribution

    International Nuclear Information System (INIS)

    Yoriyaz, H.; Moreira, J.M.L.

    1989-01-01

    Based on the signals of SPND'S (Self Powered Neutron Detectors) distributed inside of a core, the spatial power distribution is obtained using the MAP program, developed in this work. The methodology applied in MAP program uses a least mean square technique to calculate expansion coefficients that depend on the SPND'S signals. The final power or neutron flux distribution is obtained by a combination of certains functions or expansion modes that are provided from diffusion calculation with the CITATION code. The MAP program is written in PASCAL language and will be used in IEA-R1 reactor for assisting its operation. (author) [pt

  12. Low power modular power generating reactors or Small Modular Reactors (SMR)

    International Nuclear Information System (INIS)

    Chenais, Jacques

    2016-01-01

    Electronuclear reactors were small reactors at the beginning, and then tend to be always bigger and more powerful, but since some recent times, several countries specialized in reactor design and fabrication (USA, Russia, China, and South Korea) have been developing Small Modular Reactors (SMR) of less than 300 MW. As France has already produced feasibility studies and is about to launch a SMR development programme, the author comments some specific aspects of this new architecture of reactors, characterises the targeted markets, gives an overview of the various more or less advanced existing concepts: a floating barge in Russia, the SMART 100 MW project in South Korea, several concepts in the USA (the mPower 125 MW, the NuScale 45 MW, the Westinghouse 225 MW, and the HI-SMUR 160 MW projects), the ACP 100 MW in China, the CAREM 27 MW in Argentina. French projects developed by the CEA, EDF, Areva and DCNS are then presented

  13. Basic training of nuclear power reactor personnel

    International Nuclear Information System (INIS)

    Palabrica, R.J.

    1981-01-01

    The basic training of nuclear power reactor personnel should be given very close attention since it constitutes the foundation of their knowledge of nuclear technology. Emphasis should be given on the thorough understanding of basic nuclear concepts in order to have reasonable assurance of successful assimilation by those personnel of more specialized and advanced concepts to which they will be later exposed. Basic training will also provide a means for screening to ensure that those will be sent for further spezialized training will perform well. Finally, it is during the basic training phase when nuclear reactor operators will start to acquire and develop attitudes regarding reactor operation and it is important that these be properly founded. (orig.)

  14. Safety Analysis for Power Reactor Protection System

    International Nuclear Information System (INIS)

    Eisawy, E.A.; Sallam, H.

    2012-01-01

    The main function of a Reactor Protection System (RPS) is to safely shutdown the reactor and prevents the release of radioactive materials. The purpose of this paper is to present a technique and its application for used in the analysis of safety system of the Nuclear Power Plant (NPP). A more advanced technique has been presented to accurately study such problems as the plant availability assessments and Technical Specifications evaluations that are becoming increasingly important. The paper provides the Markov model for the Reactor Protection System of the NPP and presents results of model evaluations for two testing policies in technical specifications. The quantification of the Markov model provides the probability values that the system will occupy each of the possible states as a function of time.

  15. Feasibility study of chabazite absorber tube utilization in online absorption of released gaseous fission products and substitution of burnable absorber rods with chabazite absorber tubes in VVER-1000 reactor series

    International Nuclear Information System (INIS)

    Rahmani, Yashar

    2017-01-01

    Highlights: • Chabazite tubes are used for online removal of the released gaseous fission products. • The feasibility of using chabazite tubes instead of burnable absorber rods was studied. • A computational cycle was designed using the WIMSD5-B, CITATION-LDI2 and WERL codes. • In modeling fission gas release, the Weisman, Booth, Mason and T.S. models were used. • By this method, it is possible to increase cycle length and enhance heat transfer. - Abstract: As gaseous fission products, e.g. xenon and krypton have adverse effects such as reducing the rate of heat transfer in fuel rods and adding negative reactivity to the reactor core, the present manuscript was dedicated to development of a novel method for improving these defects. In the proposed method, chabazite absorber tubes were used for online removal of the released gaseous fission products from gaseous gap spaces. Moreover, in this research, feasibility of using chabazite absorber tubes instead of burnable absorber rods was examined. To perform the required modeling and calculations to successfully meet the mentioned objectives, a thermo-neutronic computational cycle was designed using the coupling of WIMSD5-B and CITATION-LDI2 codes in the neutronic section and the WERL code in the thermo-hydraulic calculations. In addition, in modeling the release process of gaseous fission products, the Weisman, Booth, Mason, and T.S. models were examined. It is worth mentioning that in this research, calculations and modeling procedures were based on the first cycle of Bushehr’s VVER-1000 reactor to study the feasibility of the proposed solution. The obtained results revealed that with application of the proposed method in this research, it is possible to increase cycle length, improve safety thresholds, and enhance heat transfer in the core of nuclear reactors.

  16. Assessment of the recovery annealing efficiency for VVER-1000 materials' structure reset and lifetime extension

    International Nuclear Information System (INIS)

    Gurovich, B.; Kuleshova, E.; Prikhodko, K.; Fedotova, S.

    2011-01-01

    The results of the VVER-1000 reactor pressure vessels welds studies based on the surveillance specimens sets have revealed a high embrittlement rate of steel with high nickel content compared with predicted embrittlement determined from the Russian Guide. For these critical vessels further safe operation (even during design service life) is not allowed without additional measures (recovery annealing of the VVER-1000 welds as earlier for VVER- 440). The reason is that the rate of high nickel VVER-1000 welds embrittlement is significantly higher than that is for base metal. In order to solve a problem of VVER-1000 lifetime extension recovery annealing validation and accelerated reirradiation of specimens for prolonged operation period estimation after annealing were necessary. In this work comparison of electron-microscopy fine structure studies and fractographic studies of Charpy specimens fracture surface of the VVER-1000 high nickel welds in different states were carried out. It allows estimation of the recovery annealing effect on steels structure and its behavior at further operation. It is shown that both secondary and primary irradiation causes alike radiation-induced fine structure changes: dislocation loops and nano-size precipitates. Recovery annealing leads to full dislocation loops dissolution and significant nano-size precipitates solution but not to the initial values. The rate of radiation defects and radiation-induced precipitates accumulation at reirradiation weld after recovery annealing is lower than at primary irradiation and determine the lower secondary embrittlement rate of VVER-1000 weld. (authors)

  17. Source driven breeding thermal power reactors

    International Nuclear Information System (INIS)

    Greenspan, E.; Ben-Gurion Univ. of the Negev, Beersheba

    1978-03-01

    The feasibility of fusion devices operating in the semi-catalyzed deuterium (SCD) mode and of high energy proton accelerators to provide the neutron sources for driving subcritical breeding light water power reactors is assessed. The assessment is done by studying the energy balance of the resulting source driven light water reactors (SDLWR) and comparing it with the energy balance of the reference light water hybrid reactors (LWHR) driven by a D-T neutron source (DT-LWHR). The conditions the non-DT neutron sources should satisfy in order to make the SDLWR viable power reactors are identified. It is found that in order for a SCD-LWHR to have the same overall efficiency as a DT-LWHR, the fusion energy gain of the SCD device should be at least one half that the DT device. The efficienct of ADLWRs using uranium targets is comparable with that of DT-LWHRs having a fusion energy gain of unity. Advantages and disadvantages of the DT-LWHR, SCD-LWHR and ADLWR are discussed. (aurthor)

  18. Stress corrosion cracking (Standard Astm G 30-90) in stainless steel 08X18H10T of swimming-pool that contain nuclear fuel in reactors V.V.E.R.-440

    International Nuclear Information System (INIS)

    Zamora R, L.; Herrera, V.

    1998-01-01

    The standard recommended practice for making and using 'U' bend stress corrosion test specimens; Designation G30-90 has been used as a laboratory tool to study the susceptibility of austenitic stainless steels and the other materials of test of intergranular stress corrosion cracking (IGSCC). The experiment has been development in a similar conditions of the chemical regime, the swimming-pool that containing nuclear fuel in borated water reactors VVER-440 in general this cladding by two films, one of carbon steel (04T26) and other with austenitic stainless steel 08X18HT (similar type 321) stabilized with titanium, the thickness of filler metals was to 4 to 8 mm. The specimens was prepare one plate with this characteristics, the welding was put in the part central with the following measurements of 160x15x5 mm. The specimens strips bent approximately 180 degrees around radius of curvature of R=14.5 mm and ε 1 = 17.2% and maintained in this plastically deformed condition during the test. And then preparing metallographically and exposure in environment of 12 and 40 gr./l of H 3 BO 3 70 Centigrade with or noting contaminants of NaCl. The results showed the initial cracks. (Author)

  19. A series of lectures on operational physics of power reactors

    International Nuclear Information System (INIS)

    Mohanakrishnan, P.; Rastogi, B.P.

    1982-01-01

    This report discusses certain aspects of operational physics of power reactors. These form a lecture series at the Winter College on Nuclear Physics and Reactors, Jan. - March 1980, conducted at the International Centre for Theoretical Physics, Trieste, Italy. The topics covered are (a) the reactor physics aspects of fuel burnup (b) theoretical methods applied for burnup prediction in power reactors (c) interpretation of neutron detector readings in terms of adjacent fuel assembly powers (d) refuelling schemes used in power reactors. The reactor types chosen for the discussion are BWR, PWR and PHWR. (author)

  20. Source driven breeding thermal power reactors

    International Nuclear Information System (INIS)

    Greenspan, E.; Schneider, A.; Misulovin, A.; Gilai, D.; Levin, P.; Ben-Gurion Univ. of the Negev, Beersheba

    1978-03-01

    Improvements in the performance of fission power reactors made possible by designing them subcritical driven by D-T neutron sources are investigated. Light-water thermal systems are found to be most promising, neutronically and energetically, for the source driven mode of operation. The range of performance characteristics expected from breeding Light Water Hybrid Reactors (LWHR) is defined. Several promising types of LWHR blankets are identified. Options opened for the nuclear energy strategy by four types of the LWHRs are examined, and the potential contribution of these LWHRs to the nuclear energy economy are discussed. The power systems based on these LWHRs are found to enable a high utilization of the energy content of the uranium resources in all forms available - including depleted uranium and spent fuel from LWRs, while being free from the need for uranium enrichment and plutonium separation capabilities. (author)

  1. Power conditioning for space nuclear reactor systems

    Science.gov (United States)

    Berman, Baruch

    1987-01-01

    This paper addresses the power conditioning subsystem for both Stirling and Brayton conversion of space nuclear reactor systems. Included are the requirements summary, trade results related to subsystem implementation, subsystem description, voltage level versus weight, efficiency and operational integrity, components selection, and shielding considerations. The discussion is supported by pertinent circuit and block diagrams. Summary conclusions and recommendations derived from the above studies are included.

  2. Compact approach to fusion power reactors

    International Nuclear Information System (INIS)

    Hagenson, R.L.; Krakowski, R.A.; Bathke, C.G.; Miller, R.L.

    1984-01-01

    The potential of the Reversed-Field Pinch (RFP) for development into an efficient, compact, copper-coil fusion reactor has been quantified by comprehensive parametric tradeoff studies. These compact systems promise to be competitive in size, power density, and cost to alternative energy sources. Conceptual engineering designs that largely substantiate these promising results have since been completed. This 1000-MWe(net) design is described along with a detailed rationale and physics/technology assessment for the compact approach to fusion

  3. Small and medium power reactors 1985

    International Nuclear Information System (INIS)

    1986-05-01

    This report is intended for designers and planners concerned with Small and Medium Power Reactors. It provides a record of the presentations during the meetings held on this subject at the Agency's General Conference in September 1985. This information should be useful as it indicates the principal findings and main conclusions and recommendations resulting from these meetings. A separate abstract was prepared for each of the 10 presentations in this report

  4. Leaching of nuclear power reactor wastes forms

    International Nuclear Information System (INIS)

    Endo, L.S.; Villalobos, J.P.; Miyamoto, H.

    1986-01-01

    The leaching tests for power reactor wastes carried out at IPEN/CNEN-SP are described. These waste forms consist mainly of spent resins and boric acid concentrates solidified in ordinary Portland cement. All tests were conducted according to the ISO and IAEA recommendations. 3 years leaching results are reported, determining cesium and strontium diffusivity coefficients for boric acid waste form and ion-exchange resins. (Author) [pt

  5. Critical Power Response to Power Oscillations in Boiling Water Reactors

    International Nuclear Information System (INIS)

    Farawila, Yousef M.; Pruitt, Douglas W.

    2003-01-01

    The response of the critical power ratio to boiling water reactor (BWR) power oscillations is essential to the methods and practice of mitigating the effects of unstable density waves. Previous methods for calculating generic critical power response utilized direct time-domain simulations of unstable reactors. In this paper, advances in understanding the nature of the BWR oscillations and critical power phenomena are combined to develop a new method for calculating the critical power response. As the constraint of the reactor state - being at or slightly beyond the instability threshold - is removed, the new method allows the calculation of sensitivities to different operation and design parameters separately, and thus allows tighter safety margins to be used. The sensitivity to flow rate and the resulting oscillation frequency change are given special attention to evaluate the extension of the oscillation 'detect-and-suppress' methods to internal pump plants where the flow rate at natural circulation and oscillation frequency are much lower than jet pump plants

  6. Physical startup tests for VVER-1200 of Novovoronezh NPP. Advanced technique and some results

    Energy Technology Data Exchange (ETDEWEB)

    Afanasiev, Dmitry A.; Kraynov, Yury A.; Pinegin, Anatoly A.; Tsyganov, Sergey V. [National Research Centre, Moscow (Russian Federation). Kurchatov Inst.

    2017-09-15

    The intention of the startup physics tests was to confirm design characteristics of the core loading and their compliance with safety analysis preconditions. The program of startup tests for the leading unit is usually composed in such a way that is is possible to study as much neutron-physical characteristics as possible in the safest condition of zero power. State-of-the-art safety analysis is including computer codes that use three dimensional neutron kinetics and thermohydraulics models. For the substantiation of such models, for its validation and verification there is a need in reactor experiments that implementing spatially distributed transients. We based on such statements when composing hot zero power physical startup program for the new VVER-1200 unit of Novovoronezh NPP. Several tests unconventional for VVER were developed for that program. It includes measuring the worth for each of control rod groups and measuring of single rod worth from the inserted groups - test that models rod ejection event in some sense.

  7. SP-100 space reactor power system readiness

    International Nuclear Information System (INIS)

    Josloff, A.T.; Matteo, D.N.; Bailey, H.S.

    1992-01-01

    This paper discusses the SP-100 Space Reactor Power System which is being developed by GE, under contract to the U.S. Department of Energy, to provide electrical power in the range of 10's to 100's of kW. The system represents an enabling technology for a wide variety of earth orbital and interplanetary science missions, nuclear electric propulsion (NEP) stages, and lunar/Mars surface power for the Space Exploration Initiative (SEI). The technology and design is now at a state of readiness to support the definition of early flight demonstration missions. Of particular importance is that SP-100 meets the demanding U.S. safety performance, reliability and life requirements. The system is scalable and flexible and can be configured to provide 10's to 100's of kWe without repeating development work and can meet DoD goals for an early, low-power demonstration flight in the 1996-1997 time frame

  8. Nuclear power reactors and hydrogen storage systems

    International Nuclear Information System (INIS)

    Ibrahim Aly Mahmoud El Osery.

    1980-01-01

    Among conclusions and results come by, a nuclear-electric-hydrogen integrated power system was suggested as a way to prevent the energy crisis. It was shown that the hydrogen power system using nuclear power as a leading energy resource would hold an advantage in the current international situation as well as for the long-term future. Results reported provide designers of integrated nuclear-electric-hydrogen systems with computation models and routines which will allow them to explore the optimal solution in coupling power reactors to hydrogen producing systems, taking into account the specific characters of hydrogen storage systems. The models were meant for average computers of a type easily available in developing countries. (author)

  9. Hydrogen mixing analyses for a VVER containment.

    Energy Technology Data Exchange (ETDEWEB)

    Sienicki, J.J.; Kostka, P.; Techy, Z.

    2002-02-25

    Hydrogen combustion may represent a threat to containment integrity in a VVER-440/213 plant owing to the combination of high pressure and high temperature. A study has been carried out using the GASFLOW 2.1 three-dimensional CFD code to evaluate the hydrogen distribution in the containment during a beyond design basis accident. The VVER-440/213 containment input model consists of two 3D blocks connected via one-dimensional (1D) ducts. One 3D block contains the reactor building and the accident localization tower with the suppression pools. Another 3D block models the air traps. 1D ducts represent the check valves connecting the accident localization tower with the air traps. The VVER pressure suppression system, called ''bubbler condenser,'' was modeled as a distributed heat sink with water thermodynamic properties. This model accounts for the energy balance. However, it is not currently possible to model dynamic phenomena associated with the water pools (e.g., vent clearing, level change). The GASFLOW 2.1 calculation gave detailed results for the spatial distribution of thermal-hydraulic parameters and gas concentrations. The range and trend of the parameters are reasonable and valuable. There are particularly interesting circulation patterns around the steam generators, in the bubbler tower and other primary system compartments. In case of the bubbler tower, concentration and temperature contour plots show an inhomogeneous distribution along the height and width, changing during the accident. Hydrogen concentrations also vary within primary system compartments displaying lower as well as higher (up to 13-20% and higher) values in some nodes. Prediction of such concentration distributions was not previously possible with lumped parameter codes. GASFLOW 2.1 calculations were compared with CONTAIN 1.2 (lumped parameter code) results. Apart from the qualitatively similar trends, there are, for the time being, quantitative differences between the

  10. Power reactor noise studies and applications

    Energy Technology Data Exchange (ETDEWEB)

    Arzhanov, V

    2002-03-01

    The present thesis deals with the neutron noise arising in power reactor systems. Generally, it can be divided into two major parts: first, neutron noise diagnostics, or more specifically, novel methods and algorithms to monitor nuclear industrial reactors; and second, contributions to neutron noise theory as applied to power reactor systems. Neutron noise diagnostics is presented by two topics. The first one is a theoretical study on the possibility to use a newly proposed current-flux (C/F) detector in Pressurised Water Reactors (PWR) for the localisation of anomalies. The second topic concerns various methods to detect guide tube impacting in Boiling Water Reactors (BWR). The significance of these problems comes from the operational experience. The thesis describes a novel method to localise vibrating control rods in a PWR by using only one C/F detector. Another novel method, based on wavelet analysis, is put forward to detect impacting guide tubes in a BWR. Neutron noise theory is developed for both Accelerator Driven Systems (ADS) and traditional reactors. By design the accelerator-driven systems would operate in a subcritical mode with a strong external source. This calls for a revision of many concepts and methods that have been developed for traditional reactors and also it poses a number of new problems. As for the latter, the thesis investigates the space-dependent neutron noise caused by a fluctuating source. It is shown that the frequency-dependent spatial behaviour exhibits some new properties that are different from those known in traditional critical systems. On the other hand, various reactor physics approximations (point kinetic, adiabatic etc.) have not been defined yet for the subcritical systems. In this respect the thesis presents a systematic formulation of the above mentioned approximations as well as investigations of their properties. Another important problem in neutron noise theory is the treatment of moving boundaries. In this case one

  11. Power reactor noise studies and applications

    International Nuclear Information System (INIS)

    Arzhanov, V.

    2002-03-01

    The present thesis deals with the neutron noise arising in power reactor systems. Generally, it can be divided into two major parts: first, neutron noise diagnostics, or more specifically, novel methods and algorithms to monitor nuclear industrial reactors; and second, contributions to neutron noise theory as applied to power reactor systems. Neutron noise diagnostics is presented by two topics. The first one is a theoretical study on the possibility to use a newly proposed current-flux (C/F) detector in Pressurised Water Reactors (PWR) for the localisation of anomalies. The second topic concerns various methods to detect guide tube impacting in Boiling Water Reactors (BWR). The significance of these problems comes from the operational experience. The thesis describes a novel method to localise vibrating control rods in a PWR by using only one C/F detector. Another novel method, based on wavelet analysis, is put forward to detect impacting guide tubes in a BWR. Neutron noise theory is developed for both Accelerator Driven Systems (ADS) and traditional reactors. By design the accelerator-driven systems would operate in a subcritical mode with a strong external source. This calls for a revision of many concepts and methods that have been developed for traditional reactors and also it poses a number of new problems. As for the latter, the thesis investigates the space-dependent neutron noise caused by a fluctuating source. It is shown that the frequency-dependent spatial behaviour exhibits some new properties that are different from those known in traditional critical systems. On the other hand, various reactor physics approximations (point kinetic, adiabatic etc.) have not been defined yet for the subcritical systems. In this respect the thesis presents a systematic formulation of the above mentioned approximations as well as investigations of their properties. Another important problem in neutron noise theory is the treatment of moving boundaries. In this case one

  12. State space modeling of reactor core in a pressurized water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ashaari, A.; Ahmad, T.; M, Wan Munirah W. [Department of Mathematical Science, Faculty of Science, Universiti Teknologi Malaysia, 81310 Skudai, Johor (Malaysia); Shamsuddin, Mustaffa [Institute of Ibnu Sina, Universiti Teknologi Malaysia, 81310 Skudai, Johor (Malaysia); Abdullah, M. Adib [Swinburne University of Technology, Faculty of Engineering, Computing and Science, Jalan Simpang Tiga, 93350 Kuching, Sarawak (Malaysia)

    2014-07-10

    The power control system of a nuclear reactor is the key system that ensures a safe operation for a nuclear power plant. However, a mathematical model of a nuclear power plant is in the form of nonlinear process and time dependent that give very hard to be described. One of the important components of a Pressurized Water Reactor is the Reactor core. The aim of this study is to analyze the performance of power produced from a reactor core using temperature of the moderator as an input. Mathematical representation of the state space model of the reactor core control system is presented and analyzed in this paper. The data and parameters are taken from a real time VVER-type Pressurized Water Reactor and will be verified using Matlab and Simulink. Based on the simulation conducted, the results show that the temperature of the moderator plays an important role in determining the power of reactor core.

  13. Boiler systems for nuclear powered reactors

    International Nuclear Information System (INIS)

    Cook, R.K.; George, B.V.

    1979-01-01

    A power generating plant which comprises a heat source, at least one main steam turbine and at least one main boiler heated by heat from the heat source and providing the steam to drive the turbine, comprises additionally at least one further steam turbine, smaller than the main turbine, and at least one further boiler, of lower capacity than the main boiler, and heated from the same heat source and providing steam for the further turbine. Particularly advantageous in nuclear power stations, where the heat source is a nuclear reactor, the invention enables peak loads, above the normal continuous rating of the main generators driven by the main turbines, to be met by the further turbine(s) and one or more further generators driven thereby. This enables the main turbines to be freed from the thermal stresses of rapid load changes, which stresses are more easily accommodated by the smaller and thus more tolerant further turbine(s). Thus auxiliary diesel-driven or other independent power plant may be made partly or wholly unnecessary. Further, low-load running which would be inefficient if achieved by means of the main turbine(s), can be more efficiently effected by shutting them down and using the smaller further turbine(s) instead. These latter may also be used to provide independent power for servicing the generating plant during normal operation or during emergency or other shutdown, and in this latter case may also serve as a heat sink for the shutdown reactor

  14. Reactor power control device in BWR power plant

    International Nuclear Information System (INIS)

    Kurosawa, Tsuneo.

    1997-01-01

    The present invention provides a device for controlling reactor power based on a start-up/shut down program in a BWR type reactor, as well as for detecting deviation, if occurs, of the power from the start-up/shut down program, to control a recycling flow rate control system or control rod drive mechanisms. Namely, a power instruction section successively executes the start-up/shut down program and controls the coolant recycling system and the control rod driving mechanisms to control the power. A current state monitoring and calculation section receives a process amount, calculates parameters showing the plant state, compares/monitors them with predetermined values, detecting the deviation, if occurs, of the plant state from the start-up/shut down program, and prevents output of a power increase control signal which leads to power increase. A forecasting and monitoring/calculation section forecasts and calculates the plant state when not yet executed steps of the start-up/shut down program are performed, stops the execution of the start-up/shut down program in the next step in a case of forecasting that the results of the calculation will deviate from the start-up/shut down program. (I.S.)

  15. Reactor power control systems in nuclear power plants

    International Nuclear Information System (INIS)

    Nakajima, Kazuo.

    1980-01-01

    Purpose: To enable power control by automatic control rod operation based on the calculated amounts of operation for the control rods determined depending on a power set value from reactor operators or on power variation amounts from other devices. Constitution: When an operator designates an automatic selection by way of a control rod operation panel, automatic signals are applied to a manual-automatic switching circuit and the mode judging circuit of a rod pattern control device. Then, mode signals such as for single operation, load setting, load following and the like produced by the operator are judged in a circuit, wherein a control rod pattern operation circuit calculates the designation for the control rods and the operation amounts for the control rods depending on the designated modes and automatic control is conducted for the control rods by a rod position control circuit, a rod drive control device and the like connected at a rod position monitor device. The reactor power is thus controlled automatically to reduce the operator's labours. The automatic power control can also be conducted in the same manner by the amount of power variations applied to the device from the external device. (Yoshino, Y.)

  16. System for forecasting a reactor power distribution

    International Nuclear Information System (INIS)

    Motoda, Hiroshi; Nishizawa, Yasuo.

    1976-01-01

    Purpose: To dispense with frequent running of detector in a BWR type reactor and permit calculation of the prevailing value and forecast value of power distribution in a specified region in an on-line basis. Constitution: The prevailing power distribution P sub(OZ) (where Z indicates a position in the axial direction) at a given position is estimated by prevailing power distribution estimating means, and the average prevailing power distribution Q sub(OZ) in the core is estimated while making correction of a primary neutron distribution model by core average characteristic measuring means. Then, the estimated core average power distribution Q sub(Z) after alteration of the core flow rate or alteration of Xe concentration is estimated by core average power distribution estimating means. At this time, a forecast power distribution P sub(Z) in a specified region after alteration of the flow rate or alteration of the Xe concentration is calculated on the basis of a relation P sub(Z) = (Q sub(Z)/Q sub(OZ)) by using P sub(OZ), Q sub(OZ) and Q sub(Z). The above calculations are carried out in a short period of time by using a process computer. (Ikeda, J.)

  17. Press travel to the Mochovce power plant in Slovakia

    International Nuclear Information System (INIS)

    1998-07-01

    This press dossier gives, first, a general presentation of the Mochovce power plant of the republic of Slovakia (history, technical characteristics, safety aspects, technical particularities of VVER 440/213 reactors (safety analysis, recent improvements), financing of the modernization project). Then, the activities of the Framatome group in central and eastern Europe are presented (partnerships, cooperation agreements and contracts). (J.S.)

  18. Safety Analysis Of Actinide Recycled Fast Power Reactor

    International Nuclear Information System (INIS)

    Taufik, Mohammad

    2001-01-01

    Simulation for safety analysis of actinide recycled fast power reactor has been performed. The objective is to know reactor response about ULOF and ULOF and UTOP simultaneous accident. From parameter result such reactivity feedback, power, temperature, and cooled flow rate can conclusion that reactor have inherent safety system, which can back to new Equilibrium State

  19. Power distribution monitor for nuclear reactor

    International Nuclear Information System (INIS)

    Nishizawa, Yasuo; Kiguchi, Takashi.

    1974-01-01

    Object: To compare the measured local power region monitor (LPRM) index with the result of a primary calculation to correct the threshold condition for the primary calculation thereby to rapidly grasp and monitor the existing power distribution. Structure: The index of an LPRM disposed in a nuclear reactor is processed in a data processor to remove therefrom a noise, and transmitted to a threshold condition processor to be stored therein. The LPRM index measured by the threshold condition processor is compared with the calculated LPRM value transmitted from the primary processor, whereby the threshold condition is corrected and transmitted to the primary processor. After the completion of calculation, the traversing incore probe (TIP) indexing value is converted to a thermal output distribution or a linear output density distribution and transmitted to an output indicator or an output typewriter. The operator may monitor the existing power distribution by monitoring the output indicator. (Kamimura, M.)

  20. Power supply trip control for nuclear reactor

    International Nuclear Information System (INIS)

    Hager, R.E.; Gutman, Jerzy.

    1987-01-01

    A control system for a trip coil in a switchgear mechanism controls the supply of electrical power to a process control device and ensures de-energization of the trip coil shortly after the trip coil is energized. The trip coil is energized not by an independent dc source as in prior art, but from rectified power from a step down transformer supplied from the switchgear output side. The transformer feeds a rectifier which is connected to the trip coil via a trip activation device. The output of the rectifier can be monitored using an optical converter to determine the ability of the control system to activate the trip coil and the condition of the power supplied to the process control device. The control device may be a rod positioner in a pressurised water nuclear reactor. (author)

  1. Advanced power reactors with improved safety characteristics

    International Nuclear Information System (INIS)

    Birkhofer, A.

    1994-01-01

    The primary objective of nuclear safety is the protection of individuals, society and environment against radiological hazards from accidental releases of radioactive materials contained in nuclear reactors. Hereto, these materials are enclosed by several successive barriers and the barriers protected against mishaps and accidents by a multi-level system of safety precautions. The evolution of reactor technology continuously improves this concept and its implementation. At a world-wide scale, several advanced reactor concepts are currently being considered, some of them already at a design stage. Essential safety objectives include both further strengthening the prevention of accidents and improving the containment of fission products should an accident occur. The proposed solutions differ considerably with regard to technical principles, plant size and time scales considered for industrial application. Two typical approaches can be distinguished: The first approach basically aims at an evolution of power reactors currently in use, taking into account the findings from safety research and from operation of current plants. This approach makes maximum use of proven technology and operating experience but may nevertheless include new safety features. The corresponding designs are often termed 'large evolutionary'. The second approach consists in more fundamental changes compared to present designs, often with strong emphasis on specific passive features protecting the fuel and fuel cladding barriers. Owing to the nature and capability of those passive features such 'innovative designs' are mostly smaller in power output. The paper describes the basic objectives of such developments and illustrates important technical concepts focusing on next generation plants, i.e. designs to be available for industrial application until the end of this decade. 1 tab. (author)

  2. Nuclear safety as applied to space power reactor systems

    International Nuclear Information System (INIS)

    Cummings, G.E.

    1987-01-01

    Current space nuclear power reactor safety issues are discussed with respect to the unique characteristics of these reactors. An approach to achieving adequate safety and a perception of safety is outlined. This approach calls for a carefully conceived safety program which makes uses of lessons learned from previous terrestrial power reactor development programs. This approach includes use of risk analyses, passive safety design features, and analyses/experiments to understand and control off-design conditions. The point is made that some recent accidents concerning terrestrial power reactors do not imply that space power reactors cannot be operated safety

  3. Cobalt-60 production in CANDU power reactors

    International Nuclear Information System (INIS)

    Slack, J.; Norton, J.L.; Malkoske, G.R.

    2003-01-01

    therapy machines. Today the majority of the cancer therapy cobalt-60 sources used in the world are manufactured using material from the NRU reactor in Chalk River. The same technology that was used for producing cobalt-60 in a research reactor was then adapted and transferred for use in a CANDU power reactor. In the early 1970s, in co-operation with Ontario Power Generation (formerly Ontario Hydro), bulk cobalt-60 production was initiated in the four Pickering A CANDU reactors located east of Toronto. This was the first full scale production of millions of curies of cobalt-60 per year. As the demand and acceptance of sterilization of medical products grew, MDS Nordion expanded its bulk supply by installing the proprietary Canadian technology in additional CANDUs. Over the years MDS Nordion has partnered with CANDU reactor owners to produce cobalt-60 at various sites. CANDU reactors that have, or are still producing cobalt-60, include Pickering A, Pickering B, Gentilly 2, Embalse in Argentina, and Bruce B. In conclusion, the technology for cobalt-60 production in CANDU reactors, designed and developed by MDS Nordion and Atomic Energy of Canada, has been safely, economically and successfully employed in CANDU reactors with over 195 reactor years of production. Today over forty percent of the world's disposable medical supplies are made safer through sterilization using cobalt-60 sources from MDS Nordion. Over the past 40 years, MDS Nordion with its CANDU reactor owner partners, has safely and reliably shipped more than 500 million curies of cobalt-60 sources to customers around the world. MDS Nordion is presently adding three more CANDU power reactors to its supply chain. These three additional cobalt producing CANDU's will help supplement the ability of the health care industry to provide safe, sterile, medical disposable products to people around the world. As new applications for cobalt-60 are identified, and the demand for bulk cobalt-60 increases, MDS Nordion and AECL

  4. Nuclear power reactors in the world. April 1990 ed.

    International Nuclear Information System (INIS)

    1990-01-01

    This is the tenth edition of Reference Data Series No. 2, Nuclear Power Reactors in the World, which is published once per year, to present the most recent reactor data available to the Agency. It contains the following summarized information: General information as of the end of 1989 on power reactors operating or under construction, and shut down; Performance data on reactors operating in the Agency's Member States, as reported to the IAEA. The information is collected by the Agency by circulating questionnaires to the Member States through the designated national correspondents. The replies are used to maintain computerized files on general and design data of, and operating experience with, power reactors. The Agency's power reactor information system (PRIS) comprising the above files provides all the information and data previously published in the Agency's Power Reactors in Member States and currently published in the Agency's Operating Experience with Nuclear Power Stations in Member States

  5. Nuclear power reactors in the world. Apr 1991 ed.

    International Nuclear Information System (INIS)

    1991-01-01

    This is the eleventh edition of Reference Data Series No. 2, Nuclear Power Reactors in the World, which is published once per year, to present the most recent reactor data available to the Agency. It contains the following summarized information: General information as of the end of 1990, on power reactors operating or under construction, and shut down; performance data on reactors operating in the Agency's Member States, as reported to the IAEA. This information is collected by the Agency by circulating questionnaires to the Member States through the designated national correspondents. The replies are used to maintain computerized files on general and design data of, and operating experience with, power reactors. The Agency's Power Reactor Information System (PRIS) comprising the above files provides all the information and data previously published in the Agency's Power Reactors in Member States and currently published in the Agency's Operating Experience with Nuclear Power Stations in Member States. 5 figs, 19 tabs

  6. Analysis of the VVER Standard Problem INSC-PSBV1 '11% Coolant Leak from Upper Plenum' with RELAP5/MOD3.2

    International Nuclear Information System (INIS)

    Melikhov, O.; Melikhov, V.; Parfenov, Yu.; Gavritenkova, O.; Lipatov, I.; Elkin, I.; Bayless, P.

    2004-01-01

    Analyses of a loss-of-coolant experiment carried out at the PSB-VVER test facility with the RELAP5/MOD3.2 code have been performed independently by analysts at the Electrogorsk Research and Engineering Center (EREC) and the Idaho National Engineering and Environmental Laboratory (INEEL). The PSB-VVER facility is a full-height scale model of a VVER 1000 reactor that is approximately 1/300 scale in volume and power. VVER Standard Problem INSC-PSBV1 represents an 11% leak from the upper plenum of the PSB-VVER facility, simulating the rupture of one of the accumulator injection lines. The safety-significant thermalhydraulic phenomena occurring in VVER type reactors addressed by this experiment were identified in the test validation matrix. Most of the phenomena of the validation matrix were reasonably simulated by RELAP5/MOD3.2 in both calculations. The major differences between the test and the calculations were the timing of the core heatup, and the thermal response to the accumulator injection cycles in both calculations. The INEEL calculation had a more extensive axial heatup, with most of the core experiencing small heat-ups. The accumulator injection was more effective in quenching the core in the test than in the INEEL calculation. This difference is attributed to the liquid distribution in the core, rather than to the heat transfer models in the code. The code calculation had a more uniform axial distribution of the liquid in the core, and the accumulator injection did not have much impact on the core liquid inventory. In the EREC calculation, only one heatup of the cladding temperature was observed for upper and middle section of the fuel rods before the final heatup. The small heat-ups were not reproduced in EREC calculation. The difference could be attributed to differences in liquid distribution, namely the core region in the EREC calculation contains more liquid over most of the transient than in the experiment. The distribution of liquid in the core in

  7. Qualification of UT methods and systems used for in-service inspections of VVER 440 vessels

    International Nuclear Information System (INIS)

    Skala, Z.; Vit, J.

    2003-01-01

    SKODA JS has been performing automated in-service inspections VVER reactor pressure vessels for more than twenty years. All of these inspections were performed by ultrasonic pulse echo method, combined from 1996 with eddy current testing. The Time of Flight Diffraction Method (TOFD) is one of modern methods of ultrasonic testing. The accuracy of sizing the through wall extent of a flaw by TOFD is much better than the accuracy achievable by the pulse echo method. A series of laboratory tests were performed by SKODA JS and confirmed the suitability of TOFD method for VVER reactor parts testing. The Czech Atomic law demands the qualification of systems and methods used for the in-service inspections of nuclear reactors. The qualification is done in accordance with ENIQ methodology and consists of preparation of the Technical Justification and practical tests made under the surveillance of Qualification Body. SKODA JS intends to qualify systems and methods used for the automated ultrasonic testing of VVER 440 and VVER 1000 reactor components from the inner as well as from the outer surface. The accuracy of the flaw through wall extent sizing by TOFD was confirmed by the qualification of methods and systems used for the testing of VVER 440 vessel circumferential weld and so the TOFD method shall be used routinely by SKODA JS for the inspection of vessel circumferential welds root area and for sizing of flaws exceeding the acceptance level. (author)

  8. Developing a computational tool for predicting physical parameters of a typical VVER-1000 core based on artificial neural network

    International Nuclear Information System (INIS)

    Mirvakili, S.M.; Faghihi, F.; Khalafi, H.

    2012-01-01

    Highlights: ► Thermal–hydraulics parameters of a VVER-1000 core based on neural network (ANN), are carried out. ► Required data for ANN training are found based on modified COBRA-EN code and then linked each other using MATLAB software. ► Based on ANN method, average and maximum temperature of fuel and clad as well as MDNBR of each FA are predicted. -- Abstract: The main goal of the present article is to design a computational tool to predict physical parameters of the VVER-1000 nuclear reactor core based on artificial neural network (ANN), taking into account a detailed physical model of the fuel rods and coolant channels in a fuel assembly. Predictions of thermal characteristics of fuel, clad and coolant are performed using cascade feed forward ANN based on linear fission power distribution and power peaking factors of FAs and hot channels factors (which are found based on our previous neutronic calculations). A software package has been developed to prepare the required data for ANN training which applies a modified COBRA-EN code for sub-channel analysis and links the codes using the MATLAB software. Based on the current estimation system, five main core TH parameters are predicted, which include the average and maximum temperatures of fuel and clad as well as the minimum departure from nucleate boiling ratio (MDNBR) for each FA. To get the best conditions for the considered ANNs training, a comprehensive sensitivity study has been performed to examine the effects of variation of hidden neurons, hidden layers, transfer functions, and the learning algorithms on the training and simulation results. Performance evaluation results show that the developed ANN can be trained to estimate the core TH parameters of a typical VVER-1000 reactor quickly without loss of accuracy.

  9. Development of advanced nuclear reactors in Russia

    International Nuclear Information System (INIS)

    Sotoudeh, M.; Silakhori, K.; Sepanloo, K.; Jahanfarnia, G.; Moattar, F.

    2008-01-01

    Several advanced reactor designs have been so far developed in Russia. The AES-91 and AES-92 plants with the VVER-1000 reactors have been developed at the beginning of 1990. However, the former design has been built in China and the latest which is certified meeting European Utility Requirements is being built in India. Moreover, the model VVER-1500 reactor with 50-60 MWd/t burn-up and an enhanced safety was being developed by Gidropress about 2005, excepting to be completed in 2007. But, this schedule has slipped in favor of development of the AES-2006 power plant incorporating a third-generation standardized VVER-1200 reactor of 1170 MWe. This is an evolutionary development of the well-proven VVER-1000 reactor in the AES-92 plant, with longer life, greater power and efficiency and its lead units are being built at Novovoronezh II, to start operation in 2012-13. Based on Atomenergoproekt declaration, the AES-2006 conforms to both Russian standards and European Utility Requirements. The most important features of the AES-2006 design are mentioned as: a design based on the passive safety systems, double containment, longer plant service life of 50 years with a capacity factor of 92%, longer irreplaceable components service life of 60 years, a 28.6% lower amount of concrete and metal, shorter construction time of 54 months, a Core Damage Frequency of 1x10 -7 / year and lower liquid and solid wastes by 70% and 80% respectively. The presented paper includes a comparative analysis of technological and safety features, economic parameters and environmental impact of the AES-2006 design versus the other western advanced reactors. Since the Bushehr phase II NPP and several other NPPs are planning in Iran, such analysis would be of a great importance

  10. U.S. Nuclear Power Reactor Plant Status

    Data.gov (United States)

    Nuclear Regulatory Commission — Demographic data on U.S. commercial nuclear power reactors, including: plant name/unit number, docket number, location, licensee, reactor/containment type, nuclear...

  11. Decommissioning of Swedish nuclear power reactors. Technology and costs

    International Nuclear Information System (INIS)

    1994-06-01

    The main topics discussed are planning, technology and costs of decommissioning nuclear power reactors. Oskarshamn-3 (BWR) and Ringhals-4 (PWR) have been used as reference reactors. 29 refs, figs, tabs

  12. To question of NPP power reactor choice for Kazakhstan

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Makhanov, Y.M.; Reznikova, R.A.; Sidorenco, A.V.

    2004-01-01

    Full text: The requirements to NPP power reactors that will be under construction in Kazakhstan are proved and given in the report. A comparative analysis of the most advanced projects of power reactors with light and heavy water under pressure of large, medium and low power is carried out. Different reactors have been considered as follows: 1. Reactors with high-power (700 MW(el) and up) such as EPR, French - German reactor; CANDU-9, Canadian heavy-water reactor; System 80+, developed by ABB Combustion Engineering company, USA; KNGR, Korean reactor of the next generation; APWR, Japanese advanced reactor; WWER-1000 (V-392) - development of Atomenergoproect /Gydropress, Russian Federation; EP 1000, European passive reactor. 2. Reactors with medium power (300 MW (el) - 700 MW (el): AP-600, passive PWR of the Westinghouse company; CANDU-6, Canadian heavy-water reactor; AC-600, Chinese passive PWR; WWER-640, Russian passive reactor; MS-600 Japanese reactor of Mitsubishi Company; KSNP-600, South Korean reactor. 3. Reactors with low power (a few MW(el)- 300 MW(el)): IRIS, reactor of IV generation, developed by the International Corporation of 13 organizations from 7 countries, SMART, South Korean integrated reactor; CAREM, Argentina integrated reactor; MRX, Japanese integrated reactor; 'UNITERM', Russian NPP with integrated reactor, development of NIKIET; AHEC-80, Russian NPP, developed by OKBM. A comparison of the projects of the above-mentioned power reactors was carried out with respect to 15 criteria of nuclear, radiating, ecological safety and economic competitiveness, developed especially for this case. Data on a condition and prospects of power production and power consumption, stations and networks in Kazakhstan necessary for the choice of projects of NPP reactors for Kazakhstan are given. According to the data a balance of power production and power consumption as a whole in the country was received at the level of 59 milliard kw/h. However, strong dis balance

  13. To question of NPP power reactor choice for Kazakhstan

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Makhanov, Y.M.; Reznikova, R.A.; Sidorenco, A.V.

    2004-01-01

    The requirements to NPP power reactors that will be under construction in Kazakhstan are proved and given in the report. A comparative analysis of the most advanced projects of power reactors with light and heavy water under pressure of large, medium and low power is carried out. Different reactors have been considered as follows: 1. Reactors with high-power (700 MW(el) and up) such as EPR, French - German reactor; CANDU-9, Canadian heavy-water reactor; System 80+, developed by ABB Combustion Engineering company, USA; KNGR, Korean reactor of the next generation; APWR, Japanese advanced reactor; WWER-1000 (V-392) - development of Atomenergoproect /Gydropress, Russian Federation; EP 1000, European passive reactor. 2. Reactors with medium power (300 MW (el) - 700 MW (el): AP-600, passive PWR of the Westinghouse company; CANDU-6, Canadian heavy-water reactor; AC-600, Chinese passive PWR; WWER-640, Russian passive reactor; MS-600 Japanese reactor of Mitsubishi Company; KSNP-600, South Korean reactor. 3. Reactors with low power (a few MW(el)- 300 MW(el)): IRIS, reactor of IV generation, developed by the International Corporation of 13 organizations from 7 countries, SMART, South Korean integrated reactor; CAREM, Argentina integrated reactor; MRX, Japanese integrated reactor; 'UNITERM', Russian NPP with integrated reactor, development of NIKIET; AHEC-80, Russian NPP, developed by OKBM. A comparison of the projects of the above-mentioned power reactors was carried out with respect to 15 criteria of nuclear, radiating, ecological safety and economic competitiveness, developed especially for this case. Data on a condition and prospects of power production and power consumption, stations and networks in Kazakhstan necessary for the choice of projects of NPP reactors for Kazakhstan are given. According to the data a balance of power production and power consumption as a whole in the country was received at the level of 59 milliard kw/h. However, strong dis balance in the

  14. power system reliability in supplying nuclear reactors

    International Nuclear Information System (INIS)

    Gad, M.M.M.

    2007-01-01

    this thesis presents a simple technique for deducing minimal cut set (MCS) from the defined minimal path set (MPS) of generic distribution system and this technique have been used to evaluate the basic reliability indices of Egypt's second research reactor (ETRR-2) electrical distribution network. the alternative system configurations are then studied to evaluate their impact on service reliability. the proposed MCS approach considers both sustained and temporary outage. the temporary outage constitutes an important parameter in characterizing the system reliability indices for critical load point in distribution system. it is also consider the power quality impact on the reliability indices

  15. Leaching of nuclear power reactor waste forms

    International Nuclear Information System (INIS)

    Endo, L.S.; Villalobos, J.P.; Miyamoto, H.

    1987-01-01

    The leaching tests for immobilized power reactor wastes carried out at IPEN are described. These wastes forms consist mainly of spent resins and boric acid concentrates solidified in ordinary Portland cement. All tests were conducted according to the ISO and IAEA recommendations. Three years leaching results are reported. The cesium diffuvity coefficients determined out of these results are about 1 x 10 -8 cm 2 /s for boric acid waste form and 9 x 10 -9 cm 2 /s for ion-exchange resin waste. Strontium diffusivity coefficients found are about 3 x 10 -11 cm 2 /s and 9 x 10 -11 cm 2 /s respectively. (Author) [pt

  16. Introduction to nuclear power reactors and their health physics systems

    International Nuclear Information System (INIS)

    Brtis, J.S.

    1982-01-01

    This paper provides an introduction to: (1) the major systems of Boiling Water Reactors (BWR's) and Pressurized Water Reactors (PWR's), (2) the production and distribution of radiation sources in BWR's and PWR's, (3) the regulatory and functional requirements for nuclear power reactor design from a health physics standpoint, (4) the health physics systems provided to meet such requirements, and (5) a bibliography of documents germane to power reactor health physics design

  17. Cascade: a high-efficiency ICF power reactor

    International Nuclear Information System (INIS)

    Pitts, J.H.

    1985-01-01

    Cascade attains a net power-plant efficiency of 49% and its cost is competitive with high-temperature gas-cooled reactor, pressurized-water reactor, and coal-fired power plants. The Cascade reactor and blanket are made of ceramic materials and activation is 6 times less than that of the MARS Tandem Mirror Reactor operating at comparable power. Hands-on maintenance of the heat exchangers is possible one day after shutdown. Essentially all tritium is recovered in the vacuum system, with the remainder recovered from the helium power conversion loop. Tritium leakage external to the vacuum system and power conversion loop is only 0.03 Ci/d

  18. Study on Reactor Performance of Online Power Monitoring in PUSPATI TRIGA Reactor (RTP)

    International Nuclear Information System (INIS)

    Zareen Khan Abdul Jalil Khan; Ridzuan Abdul Mutalib; Mohd Sabri Minhat

    2014-01-01

    The Reactor TRIGA PUSPATI (RTP) at Malaysia Nuclear Agency is a TRIGA Mark II type reactor and pool type cooled by natural circulation of light water. This paper describe on reactor performance of online power monitoring based on various parameter of reactor such as log power, linear power, period, Fuel and coolant temperature and reactivity parameter with using neutronic and other instrumentation system of reactor. Methodology of online power estimation and monitoring is to evaluate and analysis of reactor power which is important of reactor safety and control. Neutronic instrumentation system will use to estimate power measurement, differential of log and linear power and period during reactor operation .This study also focus on noise fluctuation from fission chamber during reactor operation .This work will present result of online power monitoring from RTP which indicated the safety parameter identification and initiate safety action on crossing the threshold set point trip. Conclude that optimization of online power monitoring will improved the reactor control and safety parameter of reactor during operation. (author)

  19. In-core nuclear fuel management optimization of VVER1000 using perturbation theory

    International Nuclear Information System (INIS)

    Hosseini, Mohammad; Vosoughi, Naser

    2011-01-01

    In-core nuclear fuel management is one of the most important concerns in the design of nuclear reactors. The two main goals in core fuel loading pattern design optimization are maximizing the core effective multiplication factor in order to extract the maximum energy, and keeping the local power peaking factor lower than a predetermined value to maintain fuel integrity. Because of the numerous possible patterns of the fuel assemblies in the reactor core, finding the best configuration is so important and complex. Different methods for optimization of fuel loading pattern in the core have been introduced so far. In this study, a software is programmed in C ⧣ language to find an order of the fuel loading pattern of the VVER-1000 reactor core using the perturbation theory. Our optimization method is based on minimizing the radial power peaking factor. The optimization process lunches by considering the initial loading pattern and the specifications of the fuel assemblies which are given as the input of the software. It shall be noticed that the designed algorithm is performed by just shuffling the fuel assemblies. The obtained results by employing the mentioned method on a typical reactor reveal that this method has a high precision in achieving a pattern with an allowable radial power peaking factor. (author)

  20. Revision of the second basic plans of power reactor development in Power Reactor and Nuclear Fuel Development Corporation

    International Nuclear Information System (INIS)

    1978-01-01

    Revision of the second basic plans concerning power reactor development in PNC (Power Reactor and Nuclear Fuel Development Corporation) is presented. (1) Fast breeder reactors: As for the experimental fast breeder reactor, after reaching the criticality, the power is raised to 50 MW thermal output within fiscal 1978. The prototype fast breeder reactor is intended for the electric output of 200 MW -- 300 MW, using mixed plutonium/uranium oxide fuel. Along the above lines, research and development will be carried out on reactor physics, sodium technology, machinery and parts, nuclear fuel, etc. (2) Advanced thermal reactor: The prototype advanced thermal reactor, with initial fuel primarily of slightly enriched uranium and heavy water moderation and boiling water cooling, of 165 MW electric output, is brought to its normal operation by the end of fiscal 1978. Along the above lines, research and development will be carried out on reactor physics, machinery and parts, nuclear fuel, etc. (Mori, K

  1. Nuclear reactor power for an electrically powered orbital transfer vehicle

    Science.gov (United States)

    Jaffe, L.; Beatty, R.; Bhandari, P.; Chow, E.; Deininger, W.; Ewell, R.; Fujita, T.; Grossman, M.; Kia, T.; Nesmith, B.

    1987-01-01

    To help determine the systems requirements for a 300-kWe space nuclear reactor power system, a mission and spacecraft have been examined which utilize electric propulsion and this nuclear reactor power for multiple transfers of cargo between low earth orbit (LEO) and geosynchronous earth orbit (GEO). A propulsion system employing ion thrusters and xenon propellant was selected. Propellant and thrusters are replaced after each sortie to GEO. The mass of the Orbital Transfer Vehicle (OTV), empty and dry, is 11,000 kg; nominal propellant load is 5000 kg. The OTV operates between a circular orbit at 925 km altitude, 28.5 deg inclination, and GEO. Cargo is brought to the OTV by Shuttle and an Orbital Maneuvering Vehicle (OMV); the OTV then takes it to GEO. The OTV can also bring cargo back from GEO, for transfer by OMV to the Shuttle. OTV propellant is resupplied and the ion thrusters are replaced by the OMV before each trip to GEO. At the end of mission life, the OTV's electric propulsion is used to place it in a heliocentric orbit so that the reactor will not return to earth. The nominal cargo capability to GEO is 6000 kg with a transit time of 120 days; 1350 kg can be transferred in 90 days, and 14,300 kg in 240 days. These capabilities can be considerably increased by using separate Shuttle launches to bring up propellant and cargo, or by changing to mercury propellant.

  2. Nuclear reactor power for an electrically powered orbital transfer vehicle

    International Nuclear Information System (INIS)

    Jaffe, L.; Beatty, R.; Bhandari, P.

    1987-01-01

    To help determine the systems requirements for a 300-kWe space nuclear reactor power system, a mission and spacecraft have been examined which utilize electric propulsion and this nuclear reactor power for multiple transfers of cargo between low Earth orbit (LEO) and geosynchronous Earth orbit (GEO). A propulsion system employing ion thrusters and xenon propellant was selected. Propellant and thrusters are replaced after each sortie to GEO. The mass of the Orbital Transfer Vehicle (OTV), empty and dry, is 11,000 kg; nominal propellant load is 5000 kg. The OTV operates between a circular orbit at 925 km altitude, 28.5 deg inclination, and GEO. Cargo is brought to the OTV by Shuttle and an Orbital Maneuvering Vehicle (OMV); the OTV then takes it to GEO. The OTV can also bring cargo back from GEO, for transfer by OMV to the Shuttle. OTV propellant is resupplied and the ion thrusters are replaced by the OMV before each trip to GEO. At the end of mission life, the OTV's electric propulsion is used to place it in a heliocentric orbit so that the reactor will not return to Earth. The nominal cargo capability to GEO is 6000 kg with a transit time of 120 days; 1350 kg can be transferred in 90 days, and 14,300 kg in 240 days. These capabilities can be considerably increased by using separate Shuttle launches to bring up propellant and cargo, or by changing to mercury propellant

  3. ATMEA and medium power reactors. The ATMEA joint venture and the ATMEA1 medium power reactor

    International Nuclear Information System (INIS)

    Mathet, Eric; Castello, Gerard

    2012-01-01

    This Power Point presentation presents the ATMEA company (a joint venture of Areva and Mitsubishi), the main features of its medium power reactor (ATMEA1) and its building arrangement, indicates the general safety objectives. It outlines the features of its robust design which aim at protecting, cooling down and containing. It indicates the regulatory and safety frameworks, comments the review of the safety options by the ASN and the results of this assessment

  4. Neutron measurements at nuclear power reactors [55

    CERN Document Server

    Scherpelz, R I

    2002-01-01

    Staff from the Pacific Northwest National Laboratory (operated by Battelle Memorial Institute), have performed neutron measurements at a number of commercial nuclear power plants in the United States. Neutron radiation fields at light water reactor (LWR) power plants are typically characterized by low-energy distributions due to the presence of large amounts of scattering material such as water and concrete. These low-energy distributions make it difficult to accurately monitor personnel exposures, since most survey meters and dosimeters are calibrated to higher-energy fields such as those produced by bare or D sub 2 O-moderated sup 2 sup 5 sup 2 Cf sources. Commercial plants typically use thermoluminescent dosimeters in an albedo configuration for personnel dosimetry and survey meters based on a thermal-neutron detector inside a cylindrical or spherical moderator for dose rate assessment, so their methods of routine monitoring are highly dependent on the energy of the neutron fields. Battelle has participate...

  5. The control of emissions from nuclear power reactors in Canada

    International Nuclear Information System (INIS)

    Gorman, D.J.; Neil, B.C.J.; Chatterjee, R.M.

    1988-01-01

    Nuclear power reactors in Canada are of the CANDU pressurised heavy water design. These are located in the provinces of Ontario, Quebec, and New Brunswick. Most of the nuclear generating capacity is in the province of Ontario which has 16 commissioned reactors with a total capacity of 11,500 MWe. There are four reactors under construction with an additional capacity of 3400 MWe. Nuclear power currently accounts for approximately 50% of the electrical power generation of Ontario. Regulation of the reactors is a Federal Government responsibility administered by the Atomic Energy Control Board (AECB) which licenses the reactors and sets occupational and public dose limits

  6. Utilization of the research reactors for the power reactor control instrumentation development

    International Nuclear Information System (INIS)

    Duchene, J.; Verdant, R.; Gilbert, J.

    1977-01-01

    Studies on characteristics and reliability of control instruments lead to testing with various radiations of various intensities and energy spectra. Osiris and Triton reactors present this great variety of radiations and a flexibility of use better than power reactors [fr

  7. UF6 breeder reactor power plants for electric power generation

    International Nuclear Information System (INIS)

    Rust, J.H.; Clement, J.D.; Hohl, F.

    1976-01-01

    The reactor concept analyzed is a 233 UF 6 core surrounded by a molten salt (Li 7 F, BeF 2 , ThF 4 ) blanket. Nuclear survey calculations were carried out for both spherical and cylindrical geometries. A maximum breeding ratio of 1.22 was found. Thermodynamic cycle calculations were performed for a variety of Rankine cycles. Optimization of a Rankine cycle for a gas core breeder reactor employing an intermediate heat exchanger gave a maximum efficiency of 37 percent. A conceptual design is presented along with a system layout for a 1000 MW stationary power plant. The advantages of the GCBR are as follows: (1) high efficiency, (2) simplified on-line reprocessing, (3) inherent safety considerations, (4) high breeding ratio, (5) possibility of burning all or most of the long-lived nuclear waste actinides, and (6) possibility of extrapolating the technology to higher temperatures and MHD direct conversion

  8. SCORPIO-VVER core monitoring and surveillance system with advanced capabilities

    International Nuclear Information System (INIS)

    Molnar, Jozef; Vocka, Radim

    2010-01-01

    The SCORPIO (SCORPIO-VVER) core monitoring system, its basic features and history of implementation at Czech NPPs are described. The most important improvements in the area of neutron physics, core thermal analysis and operation support are as follows: Moving to the 42 axial nodes across the whole system (2004); Implementation of new cross section library to support mixed reactor core with differences in axial geometry of used fuel types and enhancement of Core Simulator boundary conditions model, to properly address the 'wild' geometry in axial direction; Adjusting the thermohydraulic and neutron-physical models regarding to the Gd2 fuel needs; Support up to 5 types of FAs and 2 types of SPND (Posit, IST); Extension of form functions for pin-wise reconstruction to improve pin-power prediction in control rod coupler region; System adaptation to the new upgraded digital I and C unit system; Integration of the SCORPIO-VVER system and its workstation into the plant redundant in-core system; Implementation of new On-Line form function generation to module RECON; New design of the Strategy Generator with advanced predictions; Adaptation of the system to support the new up-rated reactor thermal power; Adding new online SDM calculation function into to system; Implementation of the new 3D power reconstruction with SPND interpretation; Extending the limit checking to the 'full core' checking. The control of margins to the technical specification: Extended to full core - all FA is controlled individually in core; The limits are definable up to 59 FA (1/6 symmetry); 4 limited parameters are controlled - Kr, qlin, Tout-fa, dTfa; 2 additional parameters are monitored - dTsat, DNBR; New MMI are developed to present the limited and controlled parameters in core. Upgrade 3 is planned for the Slovak Bohunice NPP in 2011-2012. (P.A.)

  9. 78 FR 64028 - Decommissioning of Nuclear Power Reactors

    Science.gov (United States)

    2013-10-25

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0035] Decommissioning of Nuclear Power Reactors AGENCY... the NRC's regulations relating to the decommissioning process for nuclear power reactors. The revision... Commission (NRC) is issuing Revision 1 of regulatory guide (RG) 1.184 ``Decommissioning of Nuclear Power...

  10. Thermionic reactor power conditioner design for nuclear electric propulsion.

    Science.gov (United States)

    Jacobsen, A. S.; Tasca, D. M.

    1971-01-01

    Consideration of the effects of various thermionic reactor parameters and requirements upon spacecraft power conditioning design. A basic spacecraft is defined using nuclear electric propulsion, requiring approximately 120 kWe. The interrelationships of reactor operating characteristics and power conditioning requirements are discussed and evaluated, and the effects on power conditioner design and performance are presented.

  11. Tokamak power reactor ignition and time dependent fractional power operation

    International Nuclear Information System (INIS)

    Vold, E.L.; Mau, T.K.; Conn, R.W.

    1986-06-01

    A flexible time-dependent and zero-dimensional plasma burn code with radial profiles was developed and employed to study the fractional power operation and the thermal burn control options for an INTOR-sized tokamak reactor. The code includes alpha thermalization and a time-dependent transport loss which can be represented by any one of several currently popular scaling laws for energy confinement time. Ignition parameters were found to vary widely in density-temperature (n-T) space for the range of scaling laws examined. Critical ignition issues were found to include the extent of confinement time degradation by alpha heating, the ratio of ion to electron transport power loss, and effect of auxiliary heating on confinement. Feedback control of the auxiliary power and ion fuel sources are shown to provide thermal stability near the ignition curve

  12. Statistic method of research reactors maximum permissible power calculation

    International Nuclear Information System (INIS)

    Grosheva, N.A.; Kirsanov, G.A.; Konoplev, K.A.; Chmshkyan, D.V.

    1998-01-01

    The technique for calculating maximum permissible power of a research reactor at which the probability of the thermal-process accident does not exceed the specified value, is presented. The statistical method is used for the calculations. It is regarded that the determining function related to the reactor safety is the known function of the reactor power and many statistically independent values which list includes the reactor process parameters, geometrical characteristics of the reactor core and fuel elements, as well as random factors connected with the reactor specific features. Heat flux density or temperature is taken as a limiting factor. The program realization of the method discussed is briefly described. The results of calculating the PIK reactor margin coefficients for different probabilities of the thermal-process accident are considered as an example. It is shown that the probability of an accident with fuel element melting in hot zone is lower than 10 -8 1 per year for the reactor rated power [ru

  13. Power generation costs for alternate reactor fuel cycles

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.

    1980-09-01

    The total electric generating costs at the power plant busbar are estimated for various nuclear reactor fuel cycles which may be considered for power generation in the future. The reactor systems include pressurized water reactors (PWR), heavy-water reactors (HWR), high-temperature gas cooled reactors (HTGR), liquid-metal fast breeder reactors (LMFBR), light-water pre-breeder and breeder reactors (LWPR, LWBR), and a fast mixed spectrum reactor (FMSR). Fuel cycles include once-through, uranium-only recycle, and full recycle of the uranium and plutonium in the spent fuel assemblies. The U 3 O 8 price for economic transition from once-through LWR fuel cycles to both PWR recycle and LMFBR systems is estimated. Electric power generation costs were determined both for a reference set of unit cost parameters and for a range of uncertainty in these parameters. In addition, cost sensitivity parameters are provided so that independent estimations can be made for alternate cost assumptions

  14. How power is generated in a nuclear reactor

    International Nuclear Information System (INIS)

    Swaminathan, V.

    1978-01-01

    Power generation by nuclear fission as a result of chain reaction caused by neutrons interacting with fissile material such as 235 U, 233 U and 239 Pu is explained. Electric power production by reactor is schematically illustrated. Materials used in thermal reactor and breeder reactor are compared. Fuel reprocessing and disposal of radioactive waste coming from reprocessing plant is briefly described. Nuclear activities in India are reviewed. Four heavy water plants and two power reactors are under construction and will be operative in the near future. Two power reactors are already in operation. Nuclear Fuel Complex at Hyderabad supplies fuel element to the reactors. Fuel reprocessing and waste management facility has been set up at Tarapur. Bhabha Atomic Research Centre at Bombay and Reactor Research Centre at Kalpakkam near Madras are engaged in applied and basic research in nuclear science and engineering. (B.G.W.)

  15. The concept of the innovative power reactor

    Directory of Open Access Journals (Sweden)

    Sang Won Lee

    2017-10-01

    Full Text Available The Fukushima accident reveals the vulnerability of existing active nuclear power plant (NPP design against prolonged loss of external electricity events. The passive safety system is considered an attractive alternative to cope with this kind of disaster. Also, the passive safety system enhances both the safety and the economics of NPPs. The adoption of a passive safety system reduces the number of active components and can minimize the construction cost of NPPs. In this paper, reflecting on the experience during the development of the APR+ design in Korea, we propose the concept of an innovative Power Reactor (iPower, which is a kind of passive NPP, to enhance safety in a revolutionary manner. The ultimate goal of iPower is to confirm the feasibility of practically eliminating radioactive material release to the environment in all accident conditions. The representative safety grade passive system includes a passive emergency core cooling system, a passive containment cooling system, and a passive auxiliary feedwater system. Preliminary analysis results show that these concepts are feasible with respect to preventing and/or mitigating the consequences of design base accidents and severe accidents.

  16. State of fuel rods spent in the VVER-1000 reactor up to a fuel burnup of 75 MW·Day/KgU

    International Nuclear Information System (INIS)

    Markov, D.; Zvir, E.; Polenok, V.; Zhitelev, V.; Strozhuk, A.; Volkova, I.

    2011-01-01

    The presented material contains the data on change in form, corrosion state and mechanical properties of fuel rod claddings, change in fuel structure and release of gaseous fission products (GFP) under the cladding. The results of PIEs of the VVER-1000 fuel rods with the high burnup of fuel (average value is 72.3 MW·day/kgU and maximum is 75 MW·day/kgU) carried out in JSC 'SSC RIAR' show that by the basic operational characteristics the lifetime of fuel rods with such burnup of fuel is not exhausted. The state of fuel rods is characterized by following key parameters. The fuel-to-cladding gap on the most part of the fuel meat is absent. With the burnup growth, diameter of the fuel rod increases due to fuel meat swelling. In so doing, the reverse strain achieves the values of 0.40-0.47 %. Ridges on the cladding are formed practically along the entire length of the fuel meat, average height of ridges makes up 25 μm, maximum - 40 μm. At burnups exceeding 55 MW·day/kgU, the rate of the fuel rod elongation is less than at low and average burnups. So if within a burnup range of 20-55 MW·day/kgU, the rate of the fuel rod elongation makes up about 0.330mm per 1 MW·day/kgU, at burnups exceeding 55 MW·day/kgU it is only 0.085mm per 1 MW·day/kgU. Corrosion state of the claddings of fuel rods with high burnup of fuel is satisfactory. The oxide film, as a rule, is uniform, dense, without cracks and exfoliation, its thickness on the external surface does not exceed 13 μm, while on the internal surface - 15 μm. Hydrogenation is insignificant, mass fraction of hydrogen does not exceed 0.01 %. Interaction of fuel rods with spacer grids does not result in significant fretting-corrosion. Based of the results of tests, short-term mechanical properties of the claddings of fuel rods with high burnup of fuel remain at high level. The state of fuel is characterized by absence of the fuel-to-cladding gap on the most part of the fuel meat, fuel is tightly fixed to the cladding

  17. Assessment of capability for modeling the core degradation in 2D geometry with ASTEC V2 integral code for VVER type of reactor

    International Nuclear Information System (INIS)

    Dimov, D.

    2011-01-01

    The ASTEC code is progressively becoming the reference European severe accident integral code through in particular the intensification of research activities carried out since 2004. The purpose of this analysis is to assess ASTEC code modelling of main phenomena arising during hypothetical severe accidents and particularly in-vessel degradation in 2D geometry. The investigation covers both early and late phase of degradation of reactor core as well as determination of corium which will enter the reactor cavity. The initial event is station back-out. In order to receive severe accident condition, failure of all active component of emergency core cooling system is apply. The analysis is focus on ICARE module of ASTEC code and particularly on so call MAGMA model. The aim of study is to determine the capability of the integral code to simulate core degradation and to determine the corium composition entering the reactor cavity. (author)

  18. Experience in using a research reactor for the training of power reactor operators

    International Nuclear Information System (INIS)

    Blotcky, A.J.; Arsenaut, L.J.

    1972-01-01

    A research reactor facility such as the one at the Omaha Veterans Administration Hospital would have much to offer in the way of training reactor operators. Although most of the candidates for the course had either received previous training in the Westinghouse Reactor Operator Training Program, had operated nuclear submarine reactors or had operated power reactors, they were not offered the opportunity to perform the extensive manipulations of a reactor that a small research facility will allow. In addition the AEC recommends 10 research reactor startups per student as a prerequisite for a cold operator?s license and these can easily be obtained during the training period

  19. Nuclear Power: Outlook for New U.S. Reactors

    National Research Council Canada - National Science Library

    Parker, Larry; Holt, Mark

    2007-01-01

    .... The renewed interest in nuclear power has resulted primarily from higher prices for natural gas, improved operation of existing reactors, and uncertainty about future restrictions on coal emissions...

  20. Management of radioactive wastes at power reactor sites in India

    International Nuclear Information System (INIS)

    Amalraj, R.V.; Balu, K.

    Indian nuclear power programme, at the present stage, is based on natural uranium fuelled heavy water moderated CANDU type reactors except for the first nuclear power station consisting of two units of enriched uranium fuelled, light water moderated, BWR type of reactors. Some of the salient aspects of radioactive waste management at power reactor sites in India are discussed. Brief reviews are presented on treatment of wastes, their disposal and environmental aspects. Indian experience in power reactor waste management is also summarised identifying some of the areas needing further work. (auth.)

  1. Instrumentation and control for reactor power setback in PFBR

    International Nuclear Information System (INIS)

    Upadhyay, Chandra Kant; Vasal, Tanmay; Nagaraj, C.P.; Madhusoodanan, K.

    2013-01-01

    In Prototype Fast Breeder Reactor (PFBR), a 500 MWe plant, Reactor Power Setback is a special operation envisaged for bulk power reduction on occurrence of certain events in Balance of Plant. The bulk power reduction requires a large negative reactivity perturbation if reactor is operating on nominal power. This necessitates a reliable monitoring system with fault tolerant I and C architecture in order to inhibit reactor SCRAM on negative reactivity trip signal. The impact of above events on the process is described. Design of a functional prototype module to carry out RPSB logic operation and its interface with other instruments has been discussed. (author)

  2. Pellet bed reactor for multi-modal space power

    International Nuclear Information System (INIS)

    Buden, D.; Williams, K.; Mast, P.; Mims, J.

    1987-01-01

    A review of forthcoming space power needs for both civil and military missions indicates that power requirements will be in the tens of megawatts. The electrical power requirements are envisioned to be twofold: long-duration lower power levels will be needed for station keeping, communications, and/or surveillance; short-duration higher power levels will be required for pulsed power devices. These power characteristics led to the proposal of a multi-modal space power reactor using a pellet bed design. Characteristics desired for such a multimegawatt reactor power source are standby, alert, and pulsed power modes; high-thermal output heat source (approximately 1000 MWt peak power); long lifetime station keeping power (10 to 30 years); high temperature output (1500 K to 1800 K); rapid-burst power transition; high reliability (above 95 percent); and stringent safety standards compliance. The proposed pellet bed reactor is designed to satisfy these characteristics

  3. Greifswald and Rheinsberg: East European VVERs with a new mission

    International Nuclear Information System (INIS)

    Sterner, H.; Leushacke, D.; Rittscher, D.

    1995-01-01

    Plans for the decommissioning of the VVER reactors at Greifswald and Rheinsberg in the former German Democratic Republic are described. The decision to decommission the eight VVER-440s (two of which are still under construction) at Greifswald and the Russian prototype PWR, VVER-2, at Rheinsberg, was taken because of a lack of public acceptance and financial considerations. Three main phases are scheduled for the project. The first, the post-operation phase, has already commenced at both sites. It involves: the operation of all systems needed safely to store fuel elements, to remove them and to condition operational waste; dismantling of mainly inactive, systems not needed for fuel handling; and system decontamination. The second phase comprises the dismantling of contaminated systems, remote dismantling and conditioning of the dismantled material. Finally, in the site restoration phase, following the dismantling of remaining systems and building decontamination and demolition, the site will be adapted for other uses. Three projects for new site use at Greifswald being pursued. As a first step, an international Technology Centre is to be created to collect and evaluate information on decommissioning experience. The centre will require international financial support and co-ordination. New facilities are already being constructed to deal with decontamination of dismantled materials and the interim storage of radioactive waste and reactor fuel. (UK)

  4. An approach of raising the low power reactor trip block (P-7) in Maanshan Power Plant

    International Nuclear Information System (INIS)

    Wang, L.C.

    1984-01-01

    The technical specification for the Maanshan Nuclear Power Station (FSAR Table 16.2.2-3) requires that with an increasing reactor power level above the setpoint of low power reactor trip block (P-7), a turbine trip shall initiate a reactor trip. This anticipatory reactor trip on turbine trip prevents the pressurizer PORV from openning during turbine trip event. In order to reduce unnecessary reactor trip due to turbine trip on low reactor power level during Maanshan start-up stage, Taiwan Power Company performed a transient analysis for turbine trip event by using RETRAN code. The highest reactor power level at which a turbine trip will not open the pressurizer PORV is searched. The results demonstrated that this power level can be increased from the original value-10% of the rated thermal power-to about 48% of the rated thermal power

  5. Basket criticality design of a dual purpose cask for VVER 1000 spent fuel assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Rezaeian, Mahdi [Nuclear Science and Technology Research Institute, Tehran (Iran, Islamic Republic of); Kamali, Jamshid [Atomic Energy Organization of Iran (AEOI), Tehran (Iran, Islamic Republic of)

    2016-12-15

    Dual purpose cask technology is one of the most prominent options for interim storage of spent fuels following their removal from reactors. Criticality safety of the spent fuel assemblies are ensured by design of the basket within these casks. In this study, a set of criticality design calculations of a dual purpose cask for 12 VVER 1000 spent fuel assemblies of Bushehr nuclear power plant were carried out. The basket material of borated stainless steel with 0.5 to 2.5 wt% of boron and Boral (Al-B{sub 4}C) with 1.5 to 40 wt% of boron carbide, were investigated and the minimum required receptacle pitch of the basket was determined. Using the calculated receptacle pitch of the basket, the minimum required diameter of the cavity could be established.

  6. Reactor G1: high power experiments

    International Nuclear Information System (INIS)

    Laage, F. de; Teste du Baillet, A.; Veyssiere, A.; Wanner, G.

    1957-01-01

    The experiments carried out in the starting-up programme of the reactor G1 comprised a series of tests at high power, which allowed the following points to be studied: 1- Effect of poisoning by Xenon (absolute value, evolution). 2- Temperature coefficients of the uranium and graphite for a temperature distribution corresponding to heating by fission. 3- Effect of the pressure (due to the coiling system) on the reactivity. 4- Calibration of the security rods as a function of their position in the pile (1). 5- Temperature distribution of the graphite, the sheathing, the uranium and the air leaving the canals, in a pile running normally at high power. 6- Neutron flux distribution in a pile running normally at high power. 7- Determination of the power by nuclear and thermodynamic methods. These experiments have been carried out under two very different pile conditions. From the 1. to the 15. of August 1956, a series of power increases, followed by periods of stabilisation, were induced in a pile containing uranium only, in 457 canals, amounting to about 34 tons of fuel. A knowledge of the efficiency of the control rods in such a pile has made it possible to measure with good accuracy the principal effects at high temperatures, that is, to deal with points 1, 2, 3, 5. Flux charts giving information on the variations of the material Laplacian and extrapolation lengths in the reflector have been drawn up. Finally the thermodynamic power has been measured under good conditions, in spite of some installation difficulties. On September 16, the pile had its final charge of 100 tons. All the canals were loaded, 1,234 with uranium and 53 (i.e. exactly 4 per cent of the total number) with thorium uniformly distributed in a square lattice of 100 cm side. Since technical difficulties prevented the calibration of the control rods, the measurements were limited to the determination of the thermodynamic power and the temperature distributions (points 5 and 7). This report will

  7. Calculation of research reactor RA power at uncontrolled reactivity changes

    International Nuclear Information System (INIS)

    Cupac, S.

    1978-01-01

    The safety analysis of research reactor RA involves also the calculation of reactor power at uncontrolled reactivity changes. The corresponding computer code, based on Point Kinetics Model has been made. The short review of method applied for solving kinetic equations is given and several examples illustrating the reactor behaviour at various reactivity changes are presented. The results already obtained are giving rather rough picture of reactor behaviour in considered situations. This is the consequence of using simplified feed back and reactor cooling models, as well as temperature reactivity coefficients, which do not correspond to the actual reactor RA structure (which is now only partly fulfilled with 80% enriched uranium fuel). (author) [sr

  8. Nuclear power reactors in the world. Apr 1985 ed.

    International Nuclear Information System (INIS)

    1985-01-01

    This is the fifth edition of Reference Data Series No. 2, Nuclear Power Reactors in the World, which replaces the Agency's publication Power Reactors in Member States. This bulletin contains the following summarized information on nuclear power reactors in the world: General information as of the end of 1984 on reactors operating or under construction and such additional information on planned and shutdown reactors as is available; Performance data on major reactor types operating in the Agency's Member States. The information is collected by the Agency by circulating questionnaires to the Member States through the designated national correspondents. The replies are used to maintain computerized files on general and design data of and operating experience with reactors

  9. Design characteristics of zero power fast reactor Lasta

    International Nuclear Information System (INIS)

    Milosevic, M.; Stefanovic, D.; Pesic, M.; Popovic, D.; Nikolic, D.; Antic, D.; Zavaljevski, N.

    1987-01-01

    The concept, purpose and preliminary design of a zero power fast reactor LASTA are described. The methods of computing the reactor core parameters and reactor kinetics are presented with the basic calculated results and analysis for one selected LASTA configuration. The nominal parameters are determined according to the selected reactor safety criteria and results of calculations. Important aspects related to the overall safety are examined in detail. (author)

  10. Design studies of Tokamak power reactor in JAERI

    International Nuclear Information System (INIS)

    Tone, T.; Nishikawa, M.; Tanaka, Y.

    1985-01-01

    Recent design studies of tokamak power reactor and related activities conducted in JAERI are presented. A design study of the SPTR (Swimming-Pool Type Reactor) concept was carried out in FY81 and FY82. The reactor design studies in the last two years focus on nuclear components, heat transport and energy conversion systems. In parallel of design studies, tokamak systems analysis code is under development to evaluate reactor performances, cost and net energy balance

  11. Methods and tools for the validation of neutron instrumentation; methods for the detection of loose VVER-1000 reactor internals. Technical report

    International Nuclear Information System (INIS)

    Stulik, P.; Sipek, B.; Pecinka, L.

    2004-12-01

    The following topics are addressed: (1) Development, tuning and laboratory testing of the proposed DMTS distributed system; (2) Testing of selected technological equipment and software within the technology of the Temelin NPP; (3) Proposal for basic performance testing of the temperature measurement dynamics on Temelin primary circuit loops; (4) Data for the design and manufacture of 2 measuring chains for the processing of operating signals from internal reactor detectors at the Dukovany-4 reactor unit using a modified experimental AMV set and the DMTS system being developed; (5) Trial measurement with the DMTS system; (6) Evaluation of the usability of signals from the ionization chambers of the innovated instrumentation and control system within the in-service diagnosis system of the Dukovany NPP using the DMTS system being developed; and (7) Calculation of acoustic frequencies of the Temelin primary circuit by means of electromechanical analogy for loop configurations including the effects of the pressurizer and idle coolant loops. (P.A.)

  12. Investigation of accident management procedures related to loss of feedwater and station blackout in PSB-VVER integral test facility

    Energy Technology Data Exchange (ETDEWEB)

    Bucalossi, A. [EC JRC, (JRC F.5) PO Box 2, 1755 ZG Petten (Netherlands); Del Nevo, A., E-mail: alessandro.delnevo@enea.it [ENEA, C.R. Brasimone, 40032 Camugnano (Italy); Moretti, F.; D' Auria, F. [GRNSPG, Universita di Pisa, via Diotisalvi 2, 56100 Pisa (Italy); Elkin, I.V.; Melikhov, O.I. [Electrogorsk Research and Engineering Centre, Electrogorsk, Moscow Region (Russian Federation)

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Four integral test facility experiments related to VVER-1000 reactor. Black-Right-Pointing-Pointer TH response of the VVER-1000 primary system following total loss of feedwater and station blackout scenarios. Black-Right-Pointing-Pointer Accident management procedures in case of total loss of feedwater and station blackout. Black-Right-Pointing-Pointer Experimental data represent an improvement of existing database for TH code validation. - Abstract: VVER 1000 reactors have some unique and specific features (e.g. large primary and secondary side fluid inventory, horizontal steam generators, core design) that require dedicated experimental and analytical analyses in order to assess the performance of safety systems and the effectiveness of possible accident management strategies. The European Commission funded project 'TACIS 2.03/97', Part A, provided valuable experimental data from the large-scale (1:300) PSB-VVER test facility, investigating accident management procedures in VVER-1000 reactor. A test matrix was developed at University of Pisa (responsible of the project) with the objective of obtaining the experimental data not covered by the OECD VVER validation matrix and with main focus on accident management procedures. Scenarios related to total loss of feed water and station blackout are investigated by means of four experiments accounting for different countermeasures, based on secondary cooling strategies and primary feed and bleed procedures. The transients are analyzed thoroughly focusing on the identification of phenomena that will challenge the code models during the simulations.

  13. Verification of computer code for calculation of coolant radiolysis in the VVER reactor core with regard for boiling in its upper part

    Energy Technology Data Exchange (ETDEWEB)

    Arkhipov, O.P.; Kabakchi, S.A. [OKB Gidropress, Podolsk, Moscow (Russian Federation)

    2010-07-01

    Code Bora for WWER coolant radiolysis calculation considering single jets boiling in the reactor core top part is developed on the basis of computer codes MOPABA-H2 (radiolysis of aqueous solutions) and SteamRad (radiolysis of vapor). Physico-chemical processes taking place in boiling core coolant are complex and diversified. Still, for the solution of certain problems their simulation can be simplified. The approach of reasonable simplification was used for development of code Bora: mathematical model assumed is purposed for simulation of phenomena only in the area of interest; the number of simulated chemical reactions and particles shall be reasonably minimum; complexity of interphase mass transfer calculation procedure shall be adequate to actually available accuracy of modeling. The analysis of new experimental initial yields of water radiolysis products data and kinetic parameters of elementary chemical reactions with their participation has been carried out. Some changes have been introduced in the mechanism of liquid water and aqueous solutions of ammonia radiolysis have been significantly revised on the basis of this analysis. Examples of the calculations provided for code Bora verification are presented. Despite of very simple simulation of interphase mass transfer, Bora allows to obtain average chemical composition of two-phase coolant at BWR core outlet with the accuracy sufficient for engineering calculations. The report also presents the results of two-phase coolant chemical composition test calculation for reactor core top part coolant boiling in pressurized water reactor. (author)

  14. Calculation of power density with MCNP in TRIGA reactor

    International Nuclear Information System (INIS)

    Snoj, L.; Ravnik, M.

    2006-01-01

    Modern Monte Carlo codes (e.g. MCNP) allow calculation of power density distribution in 3-D geometry assuming detailed geometry without unit-cell homogenization. To normalize MCNP calculation by the steady-state thermal power of a reactor, one must use appropriate scaling factors. The description of the scaling factors is not adequately described in the MCNP manual and requires detailed knowledge of the code model. As the application of MCNP for power density calculation in TRIGA reactors has not been reported in open literature, the procedure of calculating power density with MCNP and its normalization to the power level of a reactor is described in the paper. (author)

  15. Power limit and quality limit of natural circulation reactor

    International Nuclear Information System (INIS)

    Zhao Guochang; Ma Changwen

    1997-01-01

    The circulation characteristics of natural circulation reactor in boiling regime are researched. It is found that, the circulation mass flow rate and the power have a peak value at a mass quality respectively. Therefore, the natural circulation reactor has a power limit under certain technological condition. It can not be increased steadily by continually increasing the mass quality. Corresponding to this, the mass quality of natural circulation reactor has a reasonable limit. The relations between the maximum power and the reactor parameters, such as the resistance coefficient, the working pressure and so on, are analyzed. It is pointed out that the power limit of natural circulation reactor is about 1000 MW at present technological condition. Taking the above result and low quality stability experimental result into account, the authors recommend that the reasonable mass quality of natural circulation reactor working in boiling regime is from 2% to 3% under the researched working pressure

  16. Assessment of nuclear reactor concepts for low power space applications

    Science.gov (United States)

    Klein, Andrew C.; Gedeon, Stephen R.; Morey, Dennis C.

    1988-01-01

    The results of a preliminary small reactor concepts feasibility and safety evaluation designed to provide a first order validation of the nuclear feasibility and safety of six small reactor concepts are given. These small reactor concepts have potential space applications for missions in the 1 to 20 kWe power output range. It was concluded that low power concepts are available from the U.S. nuclear industry that have the potential for meeting both the operational and launch safety space mission requirements. However, each design has its uncertainties, and further work is required. The reactor concepts must be mated to a power conversion technology that can offer safe and reliable operation.

  17. Analysis of changes in the fuel component of the cost of electricity in the transition to a closed fuel cycle in nuclear power system

    Energy Technology Data Exchange (ETDEWEB)

    Gurin, Andrey V. [National Research Centre ' ' Kurchatov Institute' ' , Moscow (Russian Federation); Alekseev, P.N.

    2017-09-15

    This paper presents a study of scenarios of transition to a closed fuel cycle in the system of nuclear power, built basing on resource availability requirements at the stage of full life-cycle reactors. Conventionally, there are three main scenarios for the development of nuclear energy: with VVER reactors operating in an open fuel cycle; with VVER reactors operating in a closed fuel cycle; and co-operating VVER and BN, operating in a closed fuel cycle. For the considered scenarios, a quantitative estimation of change in time of material balances were performed, including spent fuel balance, balance of plutonium, reprocessed and depleted uranium, radioactive waste, and the analysis of the fuel component of the cost of electricity.

  18. Analysis of changes in the fuel component of the cost of electricity in the transition to a closed fuel cycle in nuclear power system

    International Nuclear Information System (INIS)

    Gurin, Andrey V.; Alekseev, P.N.

    2017-01-01

    This paper presents a study of scenarios of transition to a closed fuel cycle in the system of nuclear power, built basing on resource availability requirements at the stage of full life-cycle reactors. Conventionally, there are three main scenarios for the development of nuclear energy: with VVER reactors operating in an open fuel cycle; with VVER reactors operating in a closed fuel cycle; and co-operating VVER and BN, operating in a closed fuel cycle. For the considered scenarios, a quantitative estimation of change in time of material balances were performed, including spent fuel balance, balance of plutonium, reprocessed and depleted uranium, radioactive waste, and the analysis of the fuel component of the cost of electricity.

  19. Calibration of RB reactor power; Kalibrisanje snage reaktora RB

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Markovic, H; Ninkovic, M; Strugar, P; Dimitrijevic, Z; Takac, S; Stefanovic, D; Kocic, A; Vranic, S [Boris Kidric Institute of Nuclear Sciences Vinca, Beograd (Yugoslavia)

    1976-09-15

    The first and only calibration of RB reactor power was done in 1962, and the obtained calibration ratio was used irrespective of the lattice pitch and core configuration. Since the RB reactor is being prepared for operation at higher power levels it was indispensable to reexamine the calibration ratio, estimate its dependence on the lattice pitch, critical level of heavy water and thickness of the side reflector. It was necessary to verify the reliability of control and dosimetry instruments, and establish neutron and gamma dose dependence on reactor power. Two series of experiments were done in June 1976. First series was devoted to tests of control and dosimetry instrumentation and measurements of radiation in the RB reactor building dependent on reactor power. Second series covered measurement of thermal and epithermal neuron fluxes in the reactor core and calculation of reactor power. Four different reactor cores were chosen for these experiments. Reactor pitches were 8, 8{radical}2, and 16 cm with 40, 52 and 82 fuel channels containing 2% enriched fuel. Obtained results and analysis of these results are presented in this document with conclusions related to reactor safe operation.

  20. Calculations for accidents in water reactors during operation at power

    International Nuclear Information System (INIS)

    Blanc, H.; Dutraive, P.; Fabrega, S.; Millot, J.P.

    1976-07-01

    The behaviour of a water reactor on an accident occurring as the reactor is normally operated at power may be calculated through the computer code detailed in this article. Reactivity accidents, loss of coolant ones and power over-running ones are reviewed. (author)