WorldWideScience

Sample records for power program options

  1. China's Nuclear Power Program: Options for the US

    International Nuclear Information System (INIS)

    Suttmeier, R.P.

    1985-01-01

    The issue of American nuclear cooperation with the People's Republic of China is examined with regards to political relations, commercial benefits to the United States, and nonproliferation. China's interest in nuclear power is examined, and its nuclear program is briefly reviewed from the 1950's to present. China's international nuclear relations with other countries are discussed, and implications for the United States examined, particularly with regards to China's intentions toward nuclear proliferation, danger of diversion of material for nuclear weapons, use of pressurized water reactor technology for Chinese naval reactors, and the terms of the nuclear cooperation agreement

  2. Reasons for the nuclear power option

    International Nuclear Information System (INIS)

    Rotaru, I.; Glodeanu, F.; Mauna, T.

    1994-01-01

    Technical, economical and social reasons, strongly supporting the nuclear power option are reviewed. The history of Romanian nuclear power program is outlined with a particular focus on the Cernavoda Nuclear Power Plant project. Finally the prospective of nuclear power in Romania are assessed

  3. Village power options

    Energy Technology Data Exchange (ETDEWEB)

    Lilienthal, P. [National Renewable Energy Laboratory, Golden, CO (United States)

    1997-12-01

    This paper describes three different computer codes which have been written to model village power applications. The reasons which have driven the development of these codes include: the existance of limited field data; diverse applications can be modeled; models allow cost and performance comparisons; simulations generate insights into cost structures. The models which are discussed are: Hybrid2, a public code which provides detailed engineering simulations to analyze the performance of a particular configuration; HOMER - the hybrid optimization model for electric renewables - which provides economic screening for sensitivity analyses; and VIPOR the village power model - which is a network optimization model for comparing mini-grids to individual systems. Examples of the output of these codes are presented for specific applications.

  4. 42 CFR 457.70 - Program options.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Program options. 457.70 Section 457.70 Public... Plans for Child Health Insurance Programs and Outreach Strategies § 457.70 Program options. (a) Health benefits coverage options. A State may elect to obtain health benefits coverage under its plan through— (1...

  5. FEL options for power beaming

    International Nuclear Information System (INIS)

    Kim, K.J.; Zholents, A.A.; Zolotorev, M.S.; Vinokurov, N.A.

    1997-10-01

    The demand for the output power of communication satellites has been increasing exponentially. The satellite power is generated from solar panels which collect the sunlight and convert it to electrical power. The power per satellite is limited due to the limit in the practical size of the solar panel. One way to meet the power demand is to employ multiple satellites (up to 10) per the internationally agreed-upon ''slot'' in the geosynchronous earth orbit (GEO). However, this approach is very expensive due to the high cost of sending a satellite into a GEO orbit. An alternative approach is power beaming, i.e., to illuminate the solar panels with high power, highly-directed laser beams from earth. The power beaming generates more power per satellite for the same area of the solar panel. The minimum optical beam power, interesting for power beaming application, is P L = 200kW. The wavelength is chosen to be λ 0.84 microm, so that it is within one of the transmission windows of the air, and at the same time near the peak of the photo-voltaic conversion efficiency of Si, which is the commonly used material for the solar panels. Free electron lasers (FELs) are well suited for the power beaming application because they can provide high power with coherent wavefront, but without high energy density in media. In this article the authors discuss some principal issues, such as the choice of accelerator and electron gun, the choice of beam parameters, radiation hazards, technological availability, and overall efficiency and reliability of the installation. They also attempt to highlight the compromise between the cost of the primary installation, the operation cost, and the choice of technology, and its maturity. They then present several schemes for the accelerator-FEL systems based on RF accelerators. The initial electron beam accelerator up to the energy of a few MeV is more or less common for all these schemes

  6. Options for Affordable Fission Surface Power Systems

    International Nuclear Information System (INIS)

    Houts, Mike; Gaddis, Steve; Porter, Ron; Van Dyke, Melissa; Martin, Jim; Godfroy, Tom; Bragg-Sitton, Shannon; Garber, Anne; Pearson, Boise

    2006-01-01

    Fission surface power systems could provide abundant power anywhere on the surface of the moon or Mars. Locations could include permanently shaded regions on the moon and high latitudes on Mars. To be fully utilized, however, fission surface power systems must be safe, have adequate performance, and be affordable. This paper discusses options for the design and development of such systems. (authors)

  7. Photovoltaic power - An important new energy option

    Science.gov (United States)

    Ferber, R. R.

    1983-01-01

    A review of photovoltaic (PV) power technology is presented with an emphasis of PV as an economical and technically feasible alternative source of energy. The successful completion of the development and transfer of emerging low-cost technologies into a fully commercialized status are identified as the means to the realization of this option's full potential. The DOE National Photovoltaics Program, a significant sponsor of PV R&D, expects both flat-plate and concentrator collectors to meet established cost targets. Citing the DOE large flat-plate grid-connected system project of the Sacramento Municipal Utility District, current technology modules priced at near $5/Wp (1983 dollars) are steadily reducing costs. A recent DOE study suggests that PV-generated electricity produced at a 30-year levelized cost of 15 cents per kWh would represent a viable energy supply alternative for the nation.

  8. An options model for electric power markets

    International Nuclear Information System (INIS)

    Ghosh, Kanchan; Ramesh, V.C.

    1997-01-01

    The international electric utility industry is undergoing a radical transformation from an essentially regulated and monopolistic industry to an industry made uncertain with impending deregulation and the advent of competitive forces. This paper investigates the development of an options market for bulk power trading in a market setup while considering power system planning and operational constraints and/or requirements. In so doing it considers the different market based financial derivative instruments while can be used to trade electrical power in bulk and examines how established tools such as Optimal Power Flow (OPF) may be applied in helping to develop a price for bulk power transactions under a market based setup. (Author)

  9. 34 CFR 300.110 - Program options.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Program options. 300.110 Section 300.110 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND... DISABILITIES State Eligibility Other Fape Requirements § 300.110 Program options. The State must ensure that...

  10. 45 CFR 1306.33 - Home-based program option.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Home-based program option. 1306.33 Section 1306.33... PROGRAM HEAD START STAFFING REQUIREMENTS AND PROGRAM OPTIONS Head Start Program Options § 1306.33 Home-based program option. (a) Grantees implementing a home-based program option must: (1) Provide one home...

  11. 45 CFR 1306.34 - Combination program option.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Combination program option. 1306.34 Section 1306... START PROGRAM HEAD START STAFFING REQUIREMENTS AND PROGRAM OPTIONS Head Start Program Options § 1306.34 Combination program option. (a) Combination program option requirements: (1) Grantees implementing a...

  12. The Bonneville Power Administration new energy-efficient homes programs: Final environmental impact statement: Volume 1, Assessing indoor air quality options

    International Nuclear Information System (INIS)

    1988-03-01

    BPA has underway marketing and incentive programs to encourage the construction of new energy-efficient homes that comply with Model Conservation Standards (MCS) developed by the Northwest Power Planning Council. These homes are designed to have lower infiltration rates than current building practices provide, which is likely to contribute to increased levels of indoor air pollutants, and may adversely affect the health of occupants. BPA's current and past new homes programs maintained ventilation rates comparable to those found in current practice homes by requiring balanced mechanical ventilation. BPA now proposes to give builders and consumers more flexibility by increasing the options for protecting indoor air quality in its new homes programs. This proposal is the impetus for this Environmental Impact Statement (EIS), which was prepared for BPA by Pacific Northwest Laboratory. BPS is preparing this EIS to assess whether other techniques maintain indoor air quality comparable to that found in homes built using current practices. Although many pollutants are potentially of great concern, our analysis concentrates on radon and formaldehyde. It is based on measured concentrations of these pollutants and measured ventilation rates in current practice. Ventilation was measured using fan pressurization tests, which measure only air leakage, and perfluorocarbon tracer gas (PFT) tests, which account for ventilation from mechanical devices and occupant behavior in addition to air leakage. These tests yielded two different estimates. We used these data to estimate pollutant concentrations and lifetime cancer rates under three alternative actions. Under all of the alternatives, radon had a much greater effect than formaldehyde. 102 refs

  13. Repowering options for steam power plants

    International Nuclear Information System (INIS)

    Wen, H.; Gopalarathinam, R.

    1992-01-01

    Repowering an existing steam power plant with a gas turbine offers an attractive alternative to a new plant or life extension, especially for unit sizes smaller than 300 MWe. Gas turbine repowering improves thermal efficiency and substantially increases the plant output. Based on recent repowering studies and projects, this paper examines gas turbine repowering options for 100 MWe, 200 MWe and 300 MWe units originally designed for coal firing and currently firing either coal or natural gas. Also discussed is the option for a phased future conversion of the repowered unit to fire coal-derived gas, should there be a fluctuation in the price or availability of natural gas. A modular coal gasification plant designed to shorten the conversion time is presented. Repowering options, performance, costs, and availability impacts are discussed for selected cases

  14. Efficient Trajectory Options Allocation for the Collaborative Trajectory Options Program

    Science.gov (United States)

    Rodionova, Olga; Arneson, Heather; Sridhar, Banavar; Evans, Antony

    2017-01-01

    The Collaborative Trajectory Options Program (CTOP) is a Traffic Management Initiative (TMI) intended to control the air traffic flow rates at multiple specified Flow Constrained Areas (FCAs), where demand exceeds capacity. CTOP allows flight operators to submit the desired Trajectory Options Set (TOS) for each affected flight with associated Relative Trajectory Cost (RTC) for each option. CTOP then creates a feasible schedule that complies with capacity constraints by assigning affected flights with routes and departure delays in such a way as to minimize the total cost while maintaining equity across flight operators. The current version of CTOP implements a Ration-by-Schedule (RBS) scheme, which assigns the best available options to flights based on a First-Scheduled-First-Served heuristic. In the present study, an alternative flight scheduling approach is developed based on linear optimization. Results suggest that such an approach can significantly reduce flight delays, in the deterministic case, while maintaining equity as defined using a Max-Min fairness scheme.

  15. Ghana and the nuclear power option

    International Nuclear Information System (INIS)

    Fletcher, J.J.; Ennison, I.

    2000-01-01

    For every country, dependable and continuous supply of electricity is a prerequisite for ensuring sustainable development. In Ghana, Ghanaians have currently known the consequences of disrupted and inadequate supply of electricity. Globally too the call of ''Agenda 21'' of the Rio de Janeiro Conference (Earth Summit) to engage in the development and supply of electricity in a sustainable manner imposes on us certain limitations in our choice of energy option to utilise. Taking into account the high economic and population growths with the subsequent increase in demand for electricity in the 21st century, the fact that Ghana has no coal and imports oil which will be in dwindling supply in the 21st century and that the total hydro supply in Ghana will not be sufficient for our electricity demand in the next century, this paper proposes that Ghana starts now to plan for the introduction of the nuclear option so that in the long term we may have in place an environmentally friendly, dependable and reliable supply of energy. The paper also highlights the economic competitiveness of nuclear power over the other energy options in Ghana and addresses the apprehension and misunderstanding surrounding the nuclear power option. (author)

  16. Real option valuation of power transmission investments by stochastic simulation

    International Nuclear Information System (INIS)

    Pringles, Rolando; Olsina, Fernando; Garcés, Francisco

    2015-01-01

    Network expansions in power markets usually lead to investment decisions subject to substantial irreversibility and uncertainty. Hence, investors need valuing the flexibility to change decisions as uncertainty unfolds progressively. Real option analysis is an advanced valuation technique that enables planners to take advantage of market opportunities while preventing or mitigating losses if future conditions evolve unfavorably. In the past, many approaches for valuing real options have been developed. However, applying these methods to value transmission projects is often inappropriate as revenue cash flows are path-dependent and affected by a myriad of uncertain variables. In this work, a valuation technique based on stochastic simulation and recursive dynamic programming, called Least-Square Monte Carlo, is applied to properly value the deferral option in a transmission investment. The effect of option's maturity, the initial outlay and the capital cost upon the value of the postponement option is investigated. Finally, sensitivity analysis determines optimal decision regions to execute, postpone or reject the investment projects. - Highlights: • A modern investment appraisal method is applied to value power transmission projects. • The value of the option to postpone decision to invest in transmission projects is assessed. • Simulation methods are best suited for valuing real options in transmission investments

  17. Net energy analysis - powerful tool for selecting elective power options

    Energy Technology Data Exchange (ETDEWEB)

    Baron, S. [Brookhaven National Laboratory, Upton, NY (United States)

    1995-12-01

    A number of net energy analysis studies have been conducted in recent years for electric power production from coal, oil and uranium fuels; synthetic fuels from coal and oil shale; and heat and electric power from solar energy. This technique is an excellent indicator of investment costs, environmental impact and potential economic competitiveness of alternative electric power systems for energy planners from the Eastern European countries considering future options. Energy conservation is also important to energy planners and the net energy analysis technique is an excellent accounting system on the extent of energy resource conservation. The author proposes to discuss the technique and to present the results of his studies and others in the field. The information supplied to the attendees will serve as a powerful tool to the energy planners considering their electric power options in the future.

  18. 45 CFR 1306.32 - Center-based program option.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Center-based program option. 1306.32 Section 1306... START PROGRAM HEAD START STAFFING REQUIREMENTS AND PROGRAM OPTIONS Head Start Program Options § 1306.32 Center-based program option. (a) Class size. (1) Head Start classes must be staffed by a teacher and an...

  19. Virginia Power's capacity acquisition program

    International Nuclear Information System (INIS)

    Carney, R.W.

    1991-01-01

    Virginia Power is a utility with a growing demand for electricity. To meet that growth it has embarked on an aggressive program to encourage the construction of privately-owned generating plants. In 1988 it conducted the largest competitive acquisition program by any utility to date. Virginia Power has retained the option to build plants if the bids it receives are too costly or do not meet the needs of its customers. This paper describes the situation at Virginia Power, the program it has implemented, and the capacity additions which are scheduled between 1989 and 1995

  20. Choosing the nuclear power option: Factors to be considered

    International Nuclear Information System (INIS)

    Gueorguiev, B.; Mahadeva Rao, K.V.

    2000-01-01

    To plan and develop a nuclear power program, policies must be formulated and decided at different stages and at different levels by the government and its organizations, by the utility and by other organizations in industry and research and education, each within its sphere of interest and influence. The purpose of this paper is to highlight areas where policy decisions are needed, the options available, what they mean and the contexts in which they should be considered. (author)

  1. Power plant of Creys-Malville options and descriptions

    International Nuclear Information System (INIS)

    Saitcevsky, B.; Robert, E.; Casini, R.; Janberg, K.; Megy, J.; Crette, J.P.; Granito, F.; Leduc, J.

    The power plant of CREYS-MALVILLE is the third stage of a program which began with the experimental pile RAPSODIE and the demonstration power plant PHENIX. This is a first industrial realization in which the prime contractor will be NERSA and of which the steam plant will be supplied by the SUPER-PHENIX group under license of the Commissariat a l'Energie Atomique (CEA). The power plant of CREYS-MALVILLE will be a base loaded power plant. The essentials of the options which were taken for PHENIX, were preserved (fuel UO 2 -PUO 2 , integral primary system, core instrumentation, handling mechanisms, etc.). The principal modifications have to do with the number of secondary systems, the primary sodium purification system, and the steam generators etc. A general description of the power and its operation is given

  2. Power program and nuclear power

    International Nuclear Information System (INIS)

    Chernilin, Yu.F.

    1990-01-01

    Main points of the USSR power program and the role of nuclear power in fuel and power complex of the country are considered. Data on dynamics of economic indices of electric power generation at nuclear power plants during 1980-1988 and forecasts till 2000 are presented. It is shown that real cost of 1 kW/h of electric power is equal to 1.3-1.8 cop., and total reduced cost is equal to 1.8-2.4 cop

  3. Wireless Power Transmission Options for Space Solar Power

    Science.gov (United States)

    Potter, Seth; Davis, Dean; Born, Martin; Bayer, Martin; Howell, Joe; Mankins, John

    2008-01-01

    Space Solar Power (SSP), combined with Wireless Power Transmission (WPT), offers the far-term potential to solve major energy problems on Earth. In the long term, we aspire to beam energy to Earth from geostationary Earth orbit (GEO), or even further distances in space. In the near term, we can beam power over more moderate distances, but still stretch the limits of today s technology. In recent studies, a 100 kWe-class "Power Plug" Satellite and a 10 kWe-class Lunar Polar Solar Power outpost have been considered as the first steps in using these WPT options for SSP. Our current assessments include consideration of orbits, wavelengths, and structural designs to meet commercial, civilian government, and military needs. Notional transmitter and receiver sizes are considered for use in supplying 5 to 40 MW of power. In the longer term, lunar or asteroidal material can be used. By using SSP and WPT technology for near-term missions, we gain experience needed for sound decisions in designing and developing larger systems to send power from space to Earth.

  4. A feasibility study on nuclear power options in Mongolia

    International Nuclear Information System (INIS)

    Minato, A.; Sekimoto, H.; Amartaivan, T.

    2010-10-01

    There is a growing interest among utilities in the United States in small and medium reactors due primarily to the smaller investment and perhaps shorter construction time involved as compared to those large reactors. The potential market for small reactors (those below 300 M We) exists, specially with sizes of 50 and 100 M We. A feasibility study was conducted on nuclear power options for Ulaanbaatar, Mongolia, a country which has a potential market for small reactors. The study was focused on an optimization of a combination of coal-fired and nuclear power plants taking into account Mongolia's future nuclear program plan, future population and economic growth, and the increased electricity and district heating demands. (Author)

  5. 77 FR 26827 - Medicaid Program; Community First Choice Option

    Science.gov (United States)

    2012-05-07

    ... Medicare & Medicaid Services 42 CFR Part 441 Medicaid Program; Community First Choice Option; Final Rule #0... [CMS-2337-F] RIN 0938-AQ35 Medicaid Program; Community First Choice Option AGENCY: Centers for Medicare... Affordable Care Act, which establishes a new State option to provide home and community-based attendant...

  6. 76 FR 10735 - Medicaid Program; Community First Choice Option

    Science.gov (United States)

    2011-02-25

    ... for Medicare & Medicaid Services 42 CFR Part 441 Medicaid Program; Community First Choice Option... Part 441 [CMS-2337-P] RIN 0938-AQ35 Medicaid Program; Community First Choice Option AGENCY: Centers for... Section 2401 of the Affordable Care Act (ACA) which establishes a new State option to provide home and...

  7. Nuclear power: A competitive option? Annex 3

    International Nuclear Information System (INIS)

    Bertel, E.; Wilmer, P.

    2002-01-01

    Because the future development of nuclear power will depend largely on its economic performance compared to alternatives, the OECD Nuclear Energy Agency (NEA) investigates continuously the economic aspects of nuclear power. This paper provides key findings from a series of OECD studies on projected costs of generating electricity and other related NEA activities. It addresses the cost economics necessary for nuclear units to be competitive, and discusses the challenges and opportunities currently faced by nuclear power. (author)

  8. Sustaining the nuclear power option in Malaysia

    International Nuclear Information System (INIS)

    Jamal Khaer bin Ibrahim.

    1989-01-01

    This paper describes the approach taken to establish the information base required prior to a decision on a nuclear power programme, and the strategy adopted and the rationale behind the development of the basic core expertise on nuclear reactor technology. The effect of a lack of decision on the question of nuclear power generation on efforts to build this core technical expertise is also described. (author)

  9. Spallator: a new option for nuclear power

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, M.; Grand, P.; Takahashi, H.; Powell, J.R.; Kouts, H.J.

    1983-06-01

    The principles of the spallator reactor are reviewed. Advances in linear accelerator technology allow the design and construction of high current (hundreds of mA) continuous wave high energy (thousands of MeV) proton machines in the near term. Spallation neutronic calculations building on existing experimental results, indicate substantial neutron yields on uranium targets. Spallator target assembly designs based on water cooled reactor technology indicate operable efficient systems. Fuel cycles are presented which supply fissile material to thermal power reactors and reduce fission product waste. Preliminary comparative analysis indicates an economically competitive system in which a single purpose self-sufficient spallator supplies fuel to a number of LWRs. The spallator assures a long-term LWR power reactor economy. International interest in advancing the technology is indicated.

  10. Spallator: a new option for nuclear power

    International Nuclear Information System (INIS)

    Steinberg, M.; Grand, P.; Takahashi, H.; Powell, J.R.; Kouts, H.J.

    1983-06-01

    The principles of the spallator reactor are reviewed. Advances in linear accelerator technology allow the design and construction of high current (hundreds of mA) continuous wave high energy (thousands of MeV) proton machines in the near term. Spallation neutronic calculations building on existing experimental results, indicate substantial neutron yields on uranium targets. Spallator target assembly designs based on water cooled reactor technology indicate operable efficient systems. Fuel cycles are presented which supply fissile material to thermal power reactors and reduce fission product waste. Preliminary comparative analysis indicates an economically competitive system in which a single purpose self-sufficient spallator supplies fuel to a number of LWRs. The spallator assures a long-term LWR power reactor economy. International interest in advancing the technology is indicated

  11. Medium-size power plants. Economic options

    International Nuclear Information System (INIS)

    Vogelweith, L.; Baujat, J.; Goutail, J.

    1978-01-01

    In this paper the authors describe a method for economic evaluation of a nuclear power plant project such as advocated by the IAEA but modified through the introduction of various parameters that may affect the evaluation, i.e. the weighted evaluation rate, the annual increase in the cost of fuel, and the discount rate. The method is applied to barge-based medium-size reactors (125 MW(e)). The authors calculate the investment cost, together with the costs of administration, operation and maintenance; use is made of current assumptions regarding the price of fuel for the case of a reference nuclear plant and an oil-fired plant of the same power and in the same programme. In this way the authors derive the discounted cost of the nuclear programme and concurrent conventional programme on the basis of the following assumptions: a weighted inflation rate varying between 0 and 6% per year; an annual increase in real fuel prices ranging from 0 to 3%; and a real discount rate, equal to the real interest rate, varying between 4 and 7% per year and corresponding to nominal discount rates of up to 13.4%. The conclusion reached is that, given the real interest rates actually prevailing on the financial market, a weighted inflation rate foreseen by the majority of experts, and a rise in real fuel prices of the order of 1% per year, the medium-size nuclear power plant is more economical than a conventional plant of the same output. (author)

  12. How federalism shapes public health financing, policy, and program options.

    Science.gov (United States)

    Ogden, Lydia L

    2012-01-01

    In the United States, fiscal and functional federalism strongly shape public health policy and programs. Federalism has implications for public health practice: it molds financing and disbursement options, including funding formulas, which affect allocations and program goals, and shapes how funding decisions are operationalized in a political context. This article explores how American federalism, both fiscal and functional, structures public health funding, policy, and program options, investigating the effects of intergovernmental transfers on public health finance and programs.

  13. Thai Nuclear Power Program

    International Nuclear Information System (INIS)

    Namwong, Ratanachai

    2011-01-01

    The Electricity Generating Authority of Thailand (EGAT), the main power producer in Thailand, was first interested in nuclear power as an electricity option in 1967 when the electricity demand increased considerably for the first time as a result of the economic and industrial growth. Its viability had been assessed several times during the early seventies in relation to the changing factors. Finally in the late 1970s, the proceeding with nuclear option was suspended for a variety of reasons, for instance, public opposition, economic repercussion and the uncovering of the indigenous petroleum resources. Nonetheless, EGAT continued to maintain a core of nuclear expertise. During 1980s, faced with dwindling indigenous fossil fuel resources and restrictions on the use of further hydro as an energy source, EGAT had essentially reconsidered introducing nuclear power plants to provide a significant fraction to the long term future electricity demand. The studies on feasibility, siting and environmental impacts were conducted. However, the project was never implemented due to economics crisis in 1999 and strong opposition by environmentalists and activists groups. The 1986 Chernobyl disaster was an important cause. After a long dormant period, the nuclear power is now reviewed as one part of the solution for future energy supply in the country. Thailand currently relies on natural gas for 70 percent of its electricity, with the rest coming from oil, coal and hydro-power. One-third of the natural gas consumed in Thailand is imported, mainly from neighbouring Myanmar. According to Power Development Plan (PDP) 2007 rev.2, the total installed electricity capacity will increase from 28,530.3 MW in 2007 to 44,281 MW by the end of plan in 2021. Significantly increasing energy demand, concerns over climate change and dependence on overseas supplies of fossil fuels, all turn out in a favor of nuclear power. Under the current PDP (as revised in 2009), two 1,000- megawatt nuclear

  14. Program options to explore ocean worlds

    Science.gov (United States)

    Sherwood, B.; Lunine, J.; Sotin, C.; Cwik, T.; Naderi, F.

    2018-02-01

    Including Earth, roughly a dozen water ocean worlds exist in the solar system: the relict worlds Ceres and Mars, vast oceans inside most of the large Jovian and Saturnian icy moons, and Kuiper Belt Objects like Triton, Charon, and Pluto whose geologies are dominated by water and ammonia. Key pieces of the ocean-world science puzzle - which when completed may reveal whether life is widespread in the cosmos, why it exists where it does, and how it originates - are distributed among them. The eventual exploration of all these worlds will yield humanity's total tangible knowledge about life in the universe, essentially forever. Thus, their exploration has existential significance for humanity's self-regard, and indeed perhaps of our place in the natural scheme. The matter of planning how to pursue such a difficult and unprecedented exploration opportunity is therefore historic. The technical challenges are formidable, far harder than at Mars: missions to the Jovian and Saturnian ocean worlds are severely power-limited; trip times can be as much as a half decade and decade, respectively. And the science targets are global-scale oceans beneath kilometers of cryogenic ice. Reaching and exploring them would be a multi-generational undertaking, so again it is essential to plan and prepare. Today, we lack the instrumentation, subsystems, and remote operational-intelligence technologies needed to build and use exploration avatars as good as what we can envision needing. Each ocean world holds a piece of the puzzle, but the three priority targets are Europa at Jupiter, and Enceladus and Titan at Saturn. As with the systematic exploration of Mars, exploring these diverse worlds poses a complex technical and programmatic challenge - a strategic challenge - that needs to be designed and managed if each generation is to see its work bear fruit, and if the space science community is to make most effective use of the public money devoted to the quest. Strategic programs benefit from

  15. Solar pumped laser technology options for space power transmission

    Science.gov (United States)

    Conway, E. J.

    1986-01-01

    An overview of long-range options for in-space laser power transmission is presented. The focus is on the new technology and research status of solar-pumped lasers and their solar concentration needs. The laser options include gas photodissociation lasers, optically-pumped solid-state lasers, and blackbody-pumped transfer lasers. The paper concludes with a summary of current research thrusts.

  16. Georgia Power Company's college degree program

    International Nuclear Information System (INIS)

    Coggin, C.L.

    1988-01-01

    The purpose of this paper is to describe Georgia Power Company's on-site college degree program for nuclear power plant personnel. In February 1986, the US Nuclear Regulatory Commission issued a policy statement concerning engineering expertise on shift (Generic Letter 86-04), which appeared in Volume 50, Number 208 of the October 28, 1985 Federal Register. One of the options available to nuclear power plant personnel to meet the requirement was the combined senior reactor operator/shift technical adviser position. One of the methods for meeting the option included a bachelor's degree in engineering technology for an accredited institution, including course work in the physical, mathematical, or engineering sciences

  17. Safety options for the 1300 MWe program

    International Nuclear Information System (INIS)

    Cayol, A.; Dupuis, M.C.; Fourest, B.; Oury, J.M.

    1980-04-01

    Standardization of the nuclear plants built in France implies an examination of the main technical safety options to be taken for a given type of reactor. By this procedure the subjects for which detailed studies will be needed to confirm the decisions made for the project can be defined in advance. In this context the technical safety option analysis for the 1300 MWe plants was conducted from the end of 1975 to the middle of 1978 according to usual regulation examination practice. The main conclusions are presented on the following subjects: safety methods; technical options concerning the containment vessel, primary fluid activity, fuel elements, steam generators; general organization of the lay-out [fr

  18. French programs for advanced waste management options

    Energy Technology Data Exchange (ETDEWEB)

    Salvatores, M [CEA-DRN (France); Schapira, J P [CNRS-IN2P3 (France); Mouney, H [EDF-DE (France)

    1997-11-01

    Several organisms (CEA, CNRS, EdF, etc.) are cooperating in France on Accelerator-Driven Systems (ADS). The major motivation is the investigation of innovative options for the radioactive waste management. The paper describes the ongoing activities and future directions of this cooperative effort in the field of ADS. 11 refs, 3 figs.

  19. KiloPower Program

    Energy Technology Data Exchange (ETDEWEB)

    McClure, Patrick Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-08-04

    These are the slides for a phone interview with Aerospace America magazine of the AIAA. It goes over the KiloPower Program at Los Alamos National Laboratory (LANL), and covers the following: 1 kWe Kilopower, 10 kWe Kilopower, Kilopower Reactor Using Stirling Technology (KRUSTY) Integration Test (DAF), Reactor Configuration, and Platen Positions.

  20. Preliminary study of the nuclear power option in Belarus

    International Nuclear Information System (INIS)

    Grusha, N.M.; Kazazyan, V.T.; Malykhin, A.P.; Mikhalevich, A.A.; Yakushau, A.P.; Yaroshevich, O.I.

    1999-01-01

    The Republic of Belarus possesses an economy with many energy intensive branches. At the same time the share of domestic energy resources is about 15% of total energy demand. The share of the payment for primary energy resources reaches 60% or USD 2 billion of the total energy import. That is comparable with the annual state budget. In addition to that, about half of the installed capacities have reached their operation life and 90% of the units have to be retrofitted or replaced until 2010. Thus, the problem of energy supply is one of the most important ones for Belarus' economy. The nuclear power appears to be one of the possible ways for solving the energy demand problem in Belarus which has, as in case of many countries of Central and South-Eastern Europe, limited energy resources. In 1992 - 1994 the works for studying the possibility of NPP siting were recommenced and six relatively competitive sites have been chosen out from 54 possible locations for NPP siting. Parallely, works on assessment of environmental NPP effect in these sites were carried out. As concerning the reactors to be purchased and installed in the sites selected, the following options were taken into consideration: PWR of American Company WESTINGHOUSE; PWR N4 of France Company FRAMATOME; PWR KONVOI of German Company SIEMENS. Also promising are the new generation of Russian Reactor NPP, namely NPP - 91, NPP - 92 and NPP with NGWWER - 640 reactors. Preliminary assessment having in view the feasibility characteristics, safety, reliability as well as the degree of completion shows the Russian projects NPP - 92 and NGWWER - 640 as more preferably at present. Concerning the radioactive waste management, sites for storing low and medium active waste have been determined as well as regions for high active waste disposal. At present Belarus Republic disposes of a definite production, engineering and scientific potential, which can be used when the nuclear power program will be launched. Construction

  1. Nuclear power- the inevitable option for future energy needs

    International Nuclear Information System (INIS)

    Prasad, Y.S.R.

    1995-01-01

    In the ensuring era development and deployment of electrical power sources will be governed by environmental changes, energy security and economical competitiveness. In the energy-mix scenario nuclear power has the potential and will make significant contributions in the coming decades. It is certain that nuclear power will continue to play a vital role in bridging the widening gap of demand and availability of energy in the years to come. In sum and substance, with the limited energy options available with India, nuclear power must assume greater share to meet the rapidly growing energy demands. Fortunately, country has a sound base for achieving the goal. 14 tabs., 3 figs

  2. Orion Powered Flight Guidance Burn Options for Near Term Exploration

    Science.gov (United States)

    Fill, Tom; Goodman, John; Robinson, Shane

    2018-01-01

    NASA's Orion exploration spacecraft will fly more demanding mission profiles than previous NASA human flight spacecraft. Missions currently under development are destined for cislunar space. The EM-1 mission will fly unmanned to a Distant Retrograde Orbit (DRO) around the Moon. EM-2 will fly astronauts on a mission to the lunar vicinity. To fly these missions, Orion requires powered flight guidance that is more sophisticated than the orbital guidance flown on Apollo and the Space Shuttle. Orion's powered flight guidance software contains five burn guidance options. These five options are integrated into an architecture based on a proven shuttle heritage design, with a simple closed-loop guidance strategy. The architecture provides modularity, simplicity, versatility, and adaptability to future, yet-to-be-defined, exploration mission profiles. This paper provides a summary of the executive guidance architecture and details the five burn options to support both the nominal and abort profiles for the EM-1 and EM-2 missions.

  3. Nuclear Power Options Viability Study. Volume 4. Bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Trauger, D B; White, J D; Sims, J W [eds.

    1986-09-01

    Documents in the Nuclear Power Options Viability Study (NPOVS) bibliography are classified under one of four headings or categories as follows: nuclear options; light water reactors; liquid metal reactors; and high temperature reactors. The collection and selection of these documents, beginning early in 1984 and continuing through March of 1986, was carried out in support of the study's objective: to explore the viabilities of several nuclear electric power generation options for commercial deployment in the United States between 2000 and 2010. There are approximately 550 articles, papers, reports, and books in the bibliography that have been selected from some 2000 surveyed. The citations have been made computer accessible to facilitate rapid on-line retrieval by keyword, author, corporate author, title, journal name, or document number.

  4. Nuclear Power Options Viability Study. Volume 4. Bibliography

    International Nuclear Information System (INIS)

    Trauger, D.B.; White, J.D.; Sims, J.W.

    1986-09-01

    Documents in the Nuclear Power Options Viability Study (NPOVS) bibliography are classified under one of four headings or categories as follows: nuclear options; light water reactors; liquid metal reactors; and high temperature reactors. The collection and selection of these documents, beginning early in 1984 and continuing through March of 1986, was carried out in support of the study's objective: to explore the viabilities of several nuclear electric power generation options for commercial deployment in the United States between 2000 and 2010. There are approximately 550 articles, papers, reports, and books in the bibliography that have been selected from some 2000 surveyed. The citations have been made computer accessible to facilitate rapid on-line retrieval by keyword, author, corporate author, title, journal name, or document number

  5. Approach to studying the nuclear power option in Malaysia

    International Nuclear Information System (INIS)

    Jamal Khair Ibrahim; Mohamad Zam Zam

    1986-01-01

    As a rapid growth in industrialisation and population policy, energy consumption in Malaysia has increased cosiderably. The nation is pursuing a course of diversification of primary energy sources: gas, hydro, coal and oil. Recently nuclear power programme is assessed and evaluated as another energy option in the fuel strategy. Studies of infrastructure, manpower technological and other related considerations are included. Impacts and policy implications of the introduction of nuclear power in Malaysia are also discussed. (A.J.)

  6. Development of real options model for nuclear power plants

    International Nuclear Information System (INIS)

    Ono, Kenji

    2004-01-01

    As the Japanese electricity market is deregulated, it becomes more important for electric utilities to recognize their financial risks and to adopt strategic and scientific decision making methodology. We have developed two models for valuation of Japanese nuclear power plants to support utilities' decision making. One is a net present value (NPV) model using discounted cash flow analysis method. Another is a real options model. This model is based on strict financial technology theory and can calculate value of early retirement, life extension and new unit addition options of nuclear units under electricity price uncertainty. This can also derive an optimal period for retirement, life extension and new unit addition. (author)

  7. Advanced radioisotope power source options for Pluto Express

    International Nuclear Information System (INIS)

    Underwood, M.L.

    1995-01-01

    In the drive to reduce mass and cost, Pluto Express is investigating using an advanced power conversion technology in a small Radioisotope Power Source (RPS) to deliver the required mission power of 74 W(electric) at end of mission. Until this year the baseline power source under consideration has been a Radioisotope Thermoelectric Generator (RTG). This RTG would be a scaled down GPHS RTG with an inventory of 6 General Purpose Heat Sources (GPHS) and a mass of 17.8 kg. High efficiency, advanced technology conversion options are being examined to lower the power source mass and to reduce the amount of radioisotope needed. Three technologies are being considered as the advanced converter technology: the Alkali Metal Thermal-to-Electric Converter (AMTEC), Thermophotovoltaic (TPV) converters, and Stirling Engines. Conceptual designs for each of these options have been prepared. Each converter would require only 2 GPHSs to provide the mission power and would have a mass of 6.1, 7.2, and 12.4 kg for AMTEC, TPV, and Stirling Engines respectively. This paper reviews the status of each technology and the projected performance of an advanced RPS based on each technology. Based on the projected performance and spacecraft integration issues, Pluto Express would prefer to use the AMTEC based RPS. However, in addition to technical performance, selection of a power technology will be based on many other factors

  8. Program for analyzing power boost tests

    International Nuclear Information System (INIS)

    Wills, C.A.

    1982-03-01

    A rapid increase of power in a reactor produces a failure in the fuel. Experiments to study the conditions in the NRU reactor after such failures have been planned and carried out. Given the concentrations of specified isotopes at a number of times over the length of an experiment as produced for example, from the program SARGS and the power history of the reactor, this program calculates the release rates, escape rate coefficients, and fractional releases for the isotopes. These values may be optionally printed and plotted. Decay schemes for a limited number of mass numbers are implemented. The program is written in FORTRAN and runs on the CDC 6600 - CYBER 170 system

  9. Evaluation of Foreign Investment in Power Plants using Real Options

    Science.gov (United States)

    Kato, Moritoshi; Zhou, Yicheng

    This paper proposes new methods for evaluating foreign investment in power plants under market uncertainty using a real options approach. We suppose a thermal power plant project in a deregulated electricity market. One of our proposed methods is that we calculate the cash flow generated by the project in a reference year using actual market data to incorporate periodic characteristics of energy prices into a yearly cash flow model. We make the stochastic yearly cash flow model with the initial value which is the cash flow in the reference year, and certain trend and volatility. Then we calculate the real options value (ROV) of the project which has abandonment options using the yearly cash flow model. Another our proposed method is that we evaluate foreign currency/domestic currency exchange rate risk by representing ROV in foreign currency as yearly pay off and exchanging it to ROV in domestic currency using a stochastic exchange rate model. We analyze the effect of the heat rate and operation and maintenance costs of the power plant on ROV, and evaluate exchange rate risk through numerical examples. Our proposed method will be useful for the risk management of foreign investment in power plants.

  10. Challenges and options for large scale integration of wind power

    International Nuclear Information System (INIS)

    Tande, John Olav Giaever

    2006-01-01

    Challenges and options for large scale integration of wind power are examined. Immediate challenges are related to weak grids. Assessment of system stability requires numerical simulation. Models are being developed - validation is essential. Coordination of wind and hydro generation is a key for allowing more wind power capacity in areas with limited transmission corridors. For the case study grid depending on technology and control the allowed wind farm size is increased from 50 to 200 MW. The real life example from 8 January 2005 demonstrates that existing marked based mechanisms can handle large amounts of wind power. In wind integration studies it is essential to take account of the controllability of modern wind farms, the power system flexibility and the smoothing effect of geographically dispersed wind farms. Modern wind farms contribute to system adequacy - combining wind and hydro constitutes a win-win system (ml)

  11. Nuclear Power Infrastructure Development Program: Korean Education Program

    International Nuclear Information System (INIS)

    Choi, Sung Yeol; Hwang, Il Soon; Kim, Si Hwan

    2009-01-01

    Many countries have decided nuclear power for next energy resources as one of the long-term energy supply options. IAEA projected nuclear power expansion up to 2030 reaching between 447 GWe and 691 GWe compared to 370 GWe and 2660 TWh at the end of 2006. Both low and high projection is accompanied with new nuclear power plant constructions respectively 178 and 357, about 11 units per year, and most new construction is in North America, the Far East, Eastern Europe, the Middle East, and Southeast Asia. During the last forty years, thirty three countries have established commercial nuclear power programs but only some of them have developed comprehensive and large scale peaceful nuclear power infrastructure. Although various cooperation and guidance program of nuclear power infrastructure, developing appropriate environment and infrastructure of nuclear power plant is still challenging problems for developing countries launching nuclear power program. With increasing the demand of safety and safeguard from international society, creating appropriate infrastructure becomes essential requirements in national nuclear power program. In the viewpoint of developing countries, without sufficient explanation and proper guidance, infrastructure could be seen only as another barrier in its nuclear power program. The importance of infrastructure development would be obscured by ostensible business and infrastructure program can result in increasing entering barriers to peaceful nuclear power application field without benefits to developing countries and international community. To avoid this situation by providing enough explanation and realistic case example and cooperate with the countries wanting to establish comprehensive nuclear power infrastructure in the peaceful applications, we are creating the education program of infrastructure development with basic guidelines of the IAEA infrastructure series and Korean experiences from least developed country to advanced country

  12. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    Science.gov (United States)

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  13. The Korean nuclear power program

    International Nuclear Information System (INIS)

    Choi, Chang Tong

    1996-01-01

    Although the world nuclear power industry may appear to be in decline, continued nuclear power demand in Korea indicates future opportunities for growth and prosperity in this country. Korea has one of the world's most vigorous nuclear power programs. Korea has been an active promoter of nuclear power generation since 1978, when the country introduced nuclear power as a source of electricity. Korea now takes pride in the outstanding performance of its nuclear power plants, and has established a grand nuclear power scheme. This paper is aimed at introducing the nuclear power program of Korea, including technological development, international cooperation, and CANDU status in Korea. (author). 2 tabs

  14. Fuel Cells: Power System Option for Space Research

    Science.gov (United States)

    Shaneeth, M.; Mohanty, Surajeet

    2012-07-01

    Fuel Cells are direct energy conversion devices and, thereby, they deliver electrical energy at very high efficiency levels. Hydrogen and Oxygen gases are electrochemically processed, producing clean electric power with water as the only by product. A typical, Fuel Cell based power system involve a Electrochemical power converter, gas storage and management systems, thermal management systems and relevant control units. While there exists different types of Fuel cells, Proton Exchange Membrane (PEM) Fuel Cells are considered as the most suitable one for portable applications. Generally, Fuel Cells are considered as the primary power system option in space missions requiring high power ( > 5kW) and long durations and also where water is a consumable, such as manned missions. This is primarily due to the advantage that fuel cell based power systems offer, in terms of specific energy. Fuel cells have the potential to attain specific energy > 500Wh/kg, specific power >500W/kg, energy density > 400Whr/L and also power density > 200 W/L. This apart, a fuel cell system operate totally independent of sun light, whereas as battery based system is fully dependent on the same. This uniqueness provides added flexibility and capabilities to the missions and modularity for power system. High power requiring missions involving reusable launch vehicles, manned missions etc are expected to be richly benefited from this. Another potential application of Fuel Cell would be interplanetary exploration. Unpredictable and dusty atmospheres of heavenly bodies limits sun light significantly and there fuel cells of different types, eg, Bio-Fuel Cells, PEMFC, DMFCs would be able to work effectively. Manned or unmanned lunar out post would require continuous power even during extra long lunar nights and high power levels are expected. Regenerative Fuel Cells, a combination of Fuel Cells and Electrolysers, are identified as strong candidate. While application of Fuel Cells in high power

  15. Considering environmental health risks of energy options. Hydraulic fracturing and nuclear power

    Energy Technology Data Exchange (ETDEWEB)

    MacDonell, Margaret; Raymond, Michelle; Burganowski, Rachael; Vetrone, Andrea; Alonzo, Sydney [Argonne National Laboratory, Argonne, IL (United States). Environmental Science Div.

    2014-07-01

    Growing public concerns about climate change and environmental health impacts related to energy production have led to increased consideration of alternate sources. Nuclear power and unconventional oil and shale gas development are among the options least favored by the public, with pollutant releases resulting from routine operations as well as accidents being among the key concerns. Advances in ICT approaches and the increasingly widespread accessibility of information resources and tools have facilitated community-based initiatives and broader data sharing that can directly contribute to more informed evaluations of energy options, toward more sustainable programs from the local to the global scale.

  16. Evaluating nuclear power as the next baseload generation option

    International Nuclear Information System (INIS)

    Jackson, K.J.; Sanford, M.O.

    1992-01-01

    Numerous factors must be taken into account when planning to meet baseload generating needs of the next century. Examining nuclear power as an option to meet these needs offers significant challenges with respect to evaluating and managing the business risks. This paper describes one mechanism to accomplish this while continuing to participate in industry activities targeted at advancing the nuclear option. One possible model of pursuing high-risk, long-term projects, like nuclear power, is to spread these risks among the project participants and for each organization to commit slowly. With this model of progressive engagement, participants may invest in early information gathering with the objective of uncertainty reduction at preliminary stages in the project, before large investments must be made. For nuclear power, a partnership between a utility (or utility group) and a supplier team may well be the best means of implementing such a model. A partnership also provides opportunity to develop the long-term relationships within the industry which are imperative

  17. 76 FR 13404 - Cancer Therapy Evaluation Program Intellectual Property Option to Collaborator

    Science.gov (United States)

    2011-03-11

    ... Option to Collaborator AGENCY: National Institutes of Health, HHS. ACTION: Notice. SUMMARY: The National... Cancer Therapy Evaluation Program's Intellectual Property Option to Collaborator. [[Page 13405... Evaluation Program (CTEP)'s Intellectual Property Option to Collaborator. The proposed revision represents a...

  18. 75 FR 17412 - Cancer Therapy Evaluation Program Intellectual Property Option to Collaborator

    Science.gov (United States)

    2010-04-06

    ... Program Intellectual Property Option to Collaborator AGENCY: National Cancer Institute (NCI), National... Evaluation Program (CTEP) INTELLECTUAL PROPERTY OPTION. The proposed policy, if finalized, would establish... recommended Intellectual Property Option and Institution Notification if they wish to be considered for...

  19. ASTRID power conversion system: Assessment on steam and gas options

    International Nuclear Information System (INIS)

    Laffont, Guy; Cachon, Lionel; Jourdain, Vincent; Fauque, Jean Marie

    2013-01-01

    Conclusion: ◆ Two power conversion systems have been investigated for the ASTRID prototype. ◆ Steam PCS: • Most mature system based on a well-developed turbomachinery technology. • High plant efficiency. • Studies on steam generators designs and leak detection systems in progress with the aim of reducing the risk of large SWRs and of limiting its consequences. • Design and licensing safety assessment of a SFR must deal with the Sodium Water Air reaction (SWAR). ◆ Gas PCS: • Strong advantage as it inherently eliminates the SWR and SWAR risks. • Very innovative option: major breakthroughs but feasibility and viability not yet demonstrated. • Remaining technological challenges but no showstopper indentified. • General architecture: investigations in progress to improve performances, operability and maintainability

  20. Value of an option to purchase electric power. The case of uncertain consumption

    International Nuclear Information System (INIS)

    Bhanot, Karan

    2002-01-01

    Large manufacturers and corporations often purchase options on power to protect themselves against unanticipated price increases. This paper analyzes the impact of uncertainty in power consumption by a corporation on the value of an option to purchase electric power. Because there is no economically viable method to store power, these options are exercised to satisfy immediate consumption needs only. The amount exercised may differ from the maximum amount contracted, which in turn alters the payoffs that accrue to the option contract. We apply a Monte Carlo methodology to show that 'consumption uncertainty' may substantively lower the price of an option contract under different conditions

  1. The $2000 Electric Powertrain Option-1 Program. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report describes the tasks accomplished as part of Northrop Grumman's TRP $2000 Electric Powertrain Option-1 program. Northrop Grumman has strived to achieve technology advances and development considered as high priority to the success of future electric vehicles. Northrop Grumman has achieved the intent of the program by taking several steps toward reducing the cost of the electric vehicle powertrain, demonstrating technologies in the form of hardware and introducing enhancements into production that are consistent with the needs of the market.

  2. Biomass Power Generation Investment in China: A Real Options Evaluation

    Directory of Open Access Journals (Sweden)

    Mingming Zhang

    2016-06-01

    Full Text Available This paper proposes a real options model for evaluating the biomass power generation investment in China. The uncertainties in the market price of electricity, CO2 price and straw price are considered. Meanwhile the dynamic relationship between installed capacity and fuel cost, as well as the long-term reduction of subsidy are described. Two scenarios, i.e., with the carbon emission trading scheme existent and non-existent, respectively, is built to empirically analyze the investment of a 25-MW straw-based power generation project. The results show that investors should undertake the investment in 2030 under two scenarios. Investment values are 14,869,254.8 and 37,608,727 Chinese Yuan (RMB, respectively. The implementation of the carbon emission trading scheme theoretically helps improve investment value and advance the most likely optimal investment time. However, the current CO2 price is not sufficient to advance the most likely optimal investment time. The impacts of several factors, including subsidy policy, CO2 price, straw price, installed capacity, correlation structure and the validity period of investment, on the optimal investment strategy are also examined. It is suggested that governments take some measures, including increasing subsidy, setting the growth pattern of subsidy and establishing and perfecting a nationwide carbon trading market, to improve the investment environment and attract more investments.

  3. Power plants 2020+. Power plant options for the future and the related demand for research

    International Nuclear Information System (INIS)

    2010-01-01

    This short overview already demonstrates that in the foreseeable future all generation options - nuclear power, fossil-fired power plants and renewable sources of energy - will continue to be applied. If, however, due to climate protection targets, energy conversion processes are to be to switched to CO 2 -free or -low carbon energy sources, comprehensive research endeavours will be required in order to advance existing technology options and to adjust them to changing conditions. This paper is bound to recommend individual fields of research from the viewpoint of the VGB Scientific Advisory Board for the period 2020 and beyond. Firstly, the generation structure in the European high-voltage grid and its development until 2020 will be considered, then the research demand for - Hard coal- and lignite-fired power plants, - Renewables-based electricity generation (wind, solar energy) and - Nuclear-based electricity generation will be outlined briefly, listing the main technology issues to be answered by researchers in order to increase efficiency and to settle any ''loose ends''. Apart from generation technologies, the options for storing electrical energy will also be dealt with. These options can contribute to make the feed-in of renewables-based electricity more permanent and sustainable. (orig.)

  4. Comparison and evaluation of nuclear power plant options for geosynchronous power stations

    International Nuclear Information System (INIS)

    Williams, J.R.

    1975-01-01

    A solution to the safety, safeguards, and radwaste disposal problems of nuclear power is to locate the breeder reactor power plants far out in geosynchronous orbit and beam the power to earth with microwaves. The generation of nuclear power in space is technologically feasible and has already been demonstrated on a small scale. It has also been shown that high efficiency microwave transmission of power from synchronous orbit to earth is feasible and is not hazardous. The reactor safety problem would be virtually eliminated because of the remoteness of the satellite power station in geosynchronous orbit. The worst possible accident at such a plant would have negligible effect on the earth, certainly less than the high altitude nuclear explosions which have been conducted in the past. Accidental re-entry from geosynchronous orbit could not occur because of the very large velocity change required. The safeguards problem can be virtually eliminated by adopting the following procedures: 1) The plant is initially started up using U-235 fuel or bred plutonium or U-233 from another geosynchronous power plant, 2) Once the plant is operating, only nonhazardous fertile materials (thorium or depleted uranium) are shipped up from earth, 3) The fissile fuel is bred and used in space, and none of this highly toxic fissile material is ever returned to earth. The radioactive waste could be concentrated and ejected in canisters into deep space away from the earth. The geosynchronous nuclear power plant offers unlimited nuclear power without nuclear hazards or nuclear pollution, but at somewhat higher cost. Whether or not society will be willing to pay these higher costs of nuclear power from space, or whether new energy resources such as nuclear fusion or solar power become feasible, remains to be seen. A prudent course to follow would be to give careful consideration to all future options for large scale energy generation, including the option of nuclear power from space

  5. An Evaluation of Energy Storage Options for Nuclear Power

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bragg-Sitton, Shannon M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Dufek, Eric J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-06-01

    examination of energy storage options that could be integrated with nuclear generation. Figure 1 provides an overview of the 2015 energy mix by sector, which shows that NPPs are currently used exclusively for electricity generation that is ultimately consumed in the residential, commercial, and industrial sectors. Some areas for NPP energy growth in the future include power generation for electrified transportation and thermal generation for storage and industrial applications. Currently, most industrial thermal energy users combust fossil resources (i.e., coal or natural gas) to meet the energy needs of the processes, but heat from nuclear operations could also be used in certain specific applications.

  6. An Evaluation of Energy Storage Options for Nuclear Power

    International Nuclear Information System (INIS)

    Coleman, Justin L.; Bragg-Sitton, Shannon M.; Dufek, Eric J.

    2017-01-01

    examination of energy storage options that could be integrated with nuclear generation. Figure 1 provides an overview of the 2015 energy mix by sector, which shows that NPPs are currently used exclusively for electricity generation that is ultimately consumed in the residential, commercial, and industrial sectors. Some areas for NPP energy growth in the future include power generation for electrified transportation and thermal generation for storage and industrial applications. Currently, most industrial thermal energy users combust fossil resources (i.e., coal or natural gas) to meet the energy needs of the processes, but heat from nuclear operations could also be used in certain specific applications.

  7. US nuclear power programs

    International Nuclear Information System (INIS)

    McGolf, D.J.

    1994-01-01

    In the United States, coal provided 56 percent of the electricity generated in 1992. Nuclear energy was the next largest contributor, supplying 22 percent. Natural gas provided 9 percent, while hydro-electric and renewables together supplied another 9 percent. Currently, the 109 nuclear power plants in the U.S. have an overall generating capacity of 99,000 MWe. To improve efficiency, safety, and performance, the lessons of 30 years of experience with nuclear powerplants are being incorporated into design criteria for the next generation of U.S. plants. The new Advanced Light Water Reactor plants will feature simpler designs, which will enable more cost-effective construction and maintenance. To enhance safety, design margins are being increased, and human factors are being considered and incorporated into the designs

  8. US nuclear power programs

    Energy Technology Data Exchange (ETDEWEB)

    McGolf, D J

    1994-12-31

    In the United States, coal provided 56 percent of the electricity generated in 1992. Nuclear energy was the next largest contributor, supplying 22 percent. Natural gas provided 9 percent, while hydro-electric and renewables together supplied another 9 percent. Currently, the 109 nuclear power plants in the U.S. have an overall generating capacity of 99,000 MWe. To improve efficiency, safety, and performance, the lessons of 30 years of experience with nuclear powerplants are being incorporated into design criteria for the next generation of U.S. plants. The new Advanced Light Water Reactor plants will feature simpler designs, which will enable more cost-effective construction and maintenance. To enhance safety, design margins are being increased, and human factors are being considered and incorporated into the designs.

  9. Solar thermal electric power generation - an attractive option for Pakistan

    International Nuclear Information System (INIS)

    Khan, N.A

    1999-01-01

    Solar Thermal Energy is being successfully used for production of electricity in few developed countries for more than 10 years. In solar Electric Generating Systems high temperature is generated by concentrating solar energy on black absorber pipe in evacuated glass tubes. This heat is absorbed and transported with the help of high temperature oil in to highly insulated heat exchanger storage tanks. They are subsequently used to produce steam that generates power through steam turbines as in standard thermal power plants. Various components involved in Solar thermal field have been developed at the Solar Systems Laboratory of College of EME, NUST Rawalpindi. It is considered as a cost effective alternate for power generation. The research has been partially sponsored by Ministry of Science and Technology under its Public Sector Development Program (PSDP) in (1996-1998). Parabolic mirror design, fabrication, polishing, installation, solar tracking, absorber pipe, glass tubes, steam generation al have been developed. This paper will cover the details of indigenous technological break through made in this direction. (author)

  10. 41 CFR 102-194.5 - What is the Standard and Optional Forms Management Program?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the Standard and Optional Forms Management Program? 102-194.5 Section 102-194.5 Public Contracts and Property Management... PROGRAMS 194-STANDARD AND OPTIONAL FORMS MANAGEMENT PROGRAM § 102-194.5 What is the Standard and Optional...

  11. Advanced nuclear power options: The driving forces and their results

    International Nuclear Information System (INIS)

    Golay, M.W.

    1990-01-01

    Successful nuclear power plant concepts must simultaneously demonstrate satisfactory performance in terms of both safety and economics. In order to be attractive to both electric utility companies and the public, such plants must produce economical electric energy consistent with a level of safety which is acceptable to both the public and the plant owner. Programs for reactor development worldwide can be classified according to whether the reactor concept pursues improved safety or improved economic performance as the primary objective. When improved safety is the primary goal, safety enters the solution of the design problem as a constraint which restricts the set of allowed solutions. Conversely, when improved economic performance is the primary goal it is allowed to be pursued only to an extent which is compatible with stringent safety requirements. The three major reactor coolants under consideration for future advanced reactor use are water, helium and sodium. Reactor development programs focused upon safety and upon economics using each coolant are being pursued worldwide. It is seen that the safety-oriented concepts are typically of lower capacity by approximately an order of magnitude, than the economics-oriented concepts. This is the result, in the former concept, of using less efficient, but more reliable, means of accomplishing essential safety functions. (author)

  12. Advanced nuclear power options: The driving forces and their results

    Energy Technology Data Exchange (ETDEWEB)

    Golay, M W [Massachusetts Institute of Technology, Cambridge, MA (United States)

    1990-07-01

    Successful nuclear power plant concepts must simultaneously demonstrate satisfactory performance in terms of both safety and economics. In order to be attractive to both electric utility companies and the public, such plants must produce economical electric energy consistent with a level of safety which is acceptable to both the public and the plant owner. Programs for reactor development worldwide can be classified according to whether the reactor concept pursues improved safety or improved economic performance as the primary objective. When improved safety is the primary goal, safety enters the solution of the design problem as a constraint which restricts the set of allowed solutions. Conversely, when improved economic performance is the primary goal it is allowed to be pursued only to an extent which is compatible with stringent safety requirements. The three major reactor coolants under consideration for future advanced reactor use are water, helium and sodium. Reactor development programs focused upon safety and upon economics using each coolant are being pursued worldwide. It is seen that the safety-oriented concepts are typically of lower capacity by approximately an order of magnitude, than the economics-oriented concepts. This is the result, in the former concept, of using less efficient, but more reliable, means of accomplishing essential safety functions. (author)

  13. A note on the pricing of the perpetual American capped power put option

    OpenAIRE

    Sakagami, Yoshitaka

    2012-01-01

    We give an explicit solution to the perpetual American capped power put option pricing problem in the Black-Scholes-Merton Model. The approach is mainly based on free-boundary formulation and verification. For completeness we also give an explicit solution to the perpetual American standard power (≥1) option pricing problem.

  14. Evaluation Of Different Power Conditioning Options For Stirling Generators

    Science.gov (United States)

    Garrigos, A.; Blanes, J. M.; Carrasco, J. A.; Maset, E.; Montalban, G.; Ejea, J.; Ferreres, A.; Sanchis, E.

    2011-10-01

    Free-piston Stirling engines are an interesting alternative for electrical power systems, especially in deep space missions where photovoltaic systems are not feasible. This kind of power generators contains two main parts, the Stirling machine and the linear alternator that converts the mechanical energy from the piston movement to electrical energy. Since the generated power is in AC form, several aspects should be assessed to use such kind of generators in a spacecraft power system: AC/DC topologies, power factor correction, power regulation techniques, integration into the power system, etc. This paper details power generator operation and explores different power conversion approaches.

  15. Energy Industry Powers CTE Program

    Science.gov (United States)

    Khokhar, Amy

    2012-01-01

    Michael Fields is a recent graduate of Buckeye Union High School in Buckeye, Arizona. Fields is enrolled in the Estrella Mountain Community College (EMCC) Get Into Energy program, which means he is well on his way to a promising career. Specializing in power plant technology, in two years he will earn a certificate that will all but guarantee a…

  16. Options for electric power generation and distribution in developing countries: proceedings of the GTDC symposium'95

    International Nuclear Information System (INIS)

    1995-01-01

    This book contains the proceedings of the symposium on options for electric power generation and distribution in developing countries organised by Global Technology Development Centre (GTDC), Vienna in cooperation with Agency for Non-Conventional Energy and Rural Technology (ANERT), Thiruvananthapuram. The focus of the symposium was on problems of electricity generation and distribution mainly in the developing countries of the world and the issues addressed included : 1) an overview of existing electric power services; 2) options on fuel and technology; 3) options on operation of electricity utilities; 4) options on financing investments and planning of capacity extension or replacement. Papers relevant to INIS are indexed separately

  17. A real options evaluation model for the diffusion prospects of new renewable power generation technologies

    International Nuclear Information System (INIS)

    Kumbaroglu, Guerkan; Madlener, Reinhard; Demirel, Mustafa

    2008-01-01

    This study presents a policy planning model that integrates learning curve information on renewable power generation technologies into a dynamic programming formulation featuring real options analysis. The model recursively evaluates a set of investment alternatives on a year-by-year basis, thereby taking into account that the flexibility to delay an irreversible investment expenditure can profoundly affect the diffusion prospects of renewable power generation technologies. Price uncertainty is introduced through stochastic processes for the average wholesale price of electricity and for input fuel prices. Demand for electricity is assumed to be increasingly price-sensitive, as the electricity market deregulation proceeds, reflecting new options of consumers to react to electricity price changes (such as time-of-use pricing, unbundled electricity services, and choice of supplier). The empirical analysis is based on data for the Turkish electricity supply industry. Apart from general implications for policy-making, it provides some interesting insights about the impact of uncertainty and technical change on the diffusion of various emerging renewable energy technologies

  18. Virginia Power's regulatory reduction program

    International Nuclear Information System (INIS)

    Miller, G.D.

    1996-01-01

    Virginia Power has two nuclear plants, North Anna and Surry Power Stations, which have two units each for a total of four nuclear units. In 1992, the Nuclear Regulatory Commission solicited comments from the nuclear industry to obtain their ideas for reducing the regulatory burden on nuclear facilities. Pursuant to the new regulatory climate, Virginia Power developed an internal program to evaluate and assess the regulatory and self-imposed requirements to which they were committed, and to pursue regulatory relief or internal changes where possible and appropriate. The criteria were that public safety must be maintained, and savings must be significant. Up to the date of the conference, over US$22 million of one-time saving had been effected, and US$2.75 million in annual savings

  19. MHR fuel cycle options for future sustainability of nuclear power

    International Nuclear Information System (INIS)

    Baxter, Alan; Venneri, Francesco; Rodriguez, Carmelo; Fikani, Michael

    2005-01-01

    The future sustainability of the nuclear option is not significantly tied to the level of resources. For example, current high quality uranium reserves (∼3.34x10 6 tons) are enough for more than 55 years at present consumption rates (IAEA estimate). Doubling of the present uranium ore price (∼$26/kg) could create about a tenfold increase in resources, providing more than 550 years of supply at present rates (World Nuclear Association estimate). There are also thorium reserves which are estimated to be about three times those of uranium, and would allow for a significant increase in annual consumption levels. The key to a sustainable nuclear future is really tied to the political and technical problems of long term waste disposal, and the perceived risks of nuclear weapons proliferation. Thus fuel cycle options for a sustainable nuclear future must address and solve these issues. High temperature, Gas-Cooled, Graphite Moderated, reactors (MHRs) have nuclear and operational characteristics to provide multiple fuel cycle options to solve these issues. Three fuel cycles for the MHD are described in this paper, and their capabilities for meeting a sustainable nuclear future in terms of nuclear waste minimization and destruction, and reduction of proliferation risk, are discussed. (author)

  20. The Processual Programming Essentials – Criticism and New Options

    Directory of Open Access Journals (Sweden)

    Ion Gh. Rosca

    2008-02-01

    Full Text Available The Process Programming Basics: Priorities, Heuristic or Genetic Algorithms? This paper analyzes methods to optimize process programming, starting with the heuristic algorithms, then reviewing the current method previously advanced by the authors, the quantitative priorities, and finally approaches the problem with an innovative and promissory concept: the genetic algorithms and the “total costs and risks” optimization criterion, which is an alternative to both optimization with constraints and optimization with Lagrange multipliers. This new method emulates natural systems, thus borrowing from their robustness and adaptability. The method proves particularly useful in a turbulent and changing environment, requiring a realistic simulation model and also parallel processing in a high power computing grid.

  1. An Economic Evaluation on Replacement Plan for Aged Thermal Power Plants through a Real Option Approach

    Science.gov (United States)

    Kato, Moritoshi; Zhou, Yicheng

    This paper presents a novel method to evaluate replacement plan for aged thermal power plants under uncertain circumstances through a real option approach. The most economical plan is selected among the three options: an option to operate an existing oil-fired thermal plant, an option to mothball it, and an option to abandon it and to construct an advanced gas combined cycle power plant (ACC) at the same time. Basic ideas of our model are: we use quadranomial approach in order to evaluate an option value consisted by two different uncertain assets; we consider cash flow with a dividend in order to reflect conditions of an aged oil-fired thermal plant and use the sequential compound option approach; we evaluate replacement time using quadranomial decision tree taking into account the options. We also analyze value and time of replacement using numerical examples. Our proposed method will be practically used for generation planning. For example it is possible to make priority quantitatively in replacements of aged thermal power plants by real option values. The target year of replacement may be set as a year when cumulative probability of replacement becomes over certain level.

  2. Power options: the Massachusetts nonprofit energy purchasers consortium

    International Nuclear Information System (INIS)

    Hayes, J.

    1999-01-01

    A series of overhead viewgraphs described some of the topics that were discussed at this workshop. A corporate review of the Massachusetts Health and Educational Facilities Authority (HEFA) was presented. HEFA was formed in 1968 to provide cost savings in electric bills to health, education, cultural and other non profit organizations. The methods that HEFA uses to achieve this goal is to provide energy services with either fixed prices or with two-year or five-year options. Since their creation HEFA has a total of 100 signed natural gas contracts and 300 signed electricity contracts

  3. Fuel cells - an option for decentralized power supply?

    International Nuclear Information System (INIS)

    Ketterer, H.

    1995-01-01

    Development efforts worldwide are made on industrial-scale power stations with high-temperature fuel cells fuelled with coal gas and with off-gases of up to 1000 C, which will improve the high efficiency of the plant even further. As reported at a conference of the VDI-Gesellschaft Energietechnik, it with still take several decades until these base load power station will be in operation. On the other hand, heating power stations with low-temperature fuel cells in the range up to 200 kW have been tested successfully worldwide. (orig.) [de

  4. Solar Power System Options for the Radiation and Technology Demonstration Spacecraft

    Science.gov (United States)

    Kerslake, Thomas W.; Haraburda, Francis M.; Riehl, John P.

    2000-01-01

    The Radiation and Technology Demonstration (RTD) Mission has the primary objective of demonstrating high-power (10 kilowatts) electric thruster technologies in Earth orbit. This paper discusses the conceptual design of the RTD spacecraft photovoltaic (PV) power system and mission performance analyses. These power system studies assessed multiple options for PV arrays, battery technologies and bus voltage levels. To quantify performance attributes of these power system options, a dedicated Fortran code was developed to predict power system performance and estimate system mass. The low-thrust mission trajectory was analyzed and important Earth orbital environments were modeled. Baseline power system design options are recommended on the basis of performance, mass and risk/complexity. Important findings from parametric studies are discussed and the resulting impacts to the spacecraft design and cost.

  5. Choosing the nuclear power option: Factors to be considered

    International Nuclear Information System (INIS)

    1998-01-01

    A need was expressed by Member States for guidance on policy issues to be addressed by decision makers considering the introduction of nuclear power programmes. This publication has been prepared by the IAEA, on the basis of past experience with nuclear power programmes in Member States and the current realities of the world nuclear regime, to provide information on political, governmental, economic, financial, technical and safety issues associated with planning and implementing a nuclear power programme. It highlights the main areas in which policies must be developed as well as the roles and responsibilities of the government, the plant owner and the national industry. For those interested in examining some of the issues in more depth, a list of related IAEA publications is provided in the bibliography. It is hoped that this guide will serve a useful purpose in assisting decision makers and governments in Member States considering the introduction of nuclear power programmes

  6. Status of nuclear power programs in South America

    International Nuclear Information System (INIS)

    Spitalnik, J.

    2010-10-01

    Analysis of nuclear power plants construction in four South American countries - Argentina, Brazil, Chile and Uruguay - is made based on programs set up by government specialized agencies. In Argentina, in a time-span up to 2023, the nuclear power program considers a five-fold increase of the current installed capacity reaching some 5,000 M We. The Brazilian reference scenario will install additional 4,000 M We, up to 2030, to reach a total installed capacity of about 6,000 M We. Other scenarios could bring this total to some 8,000 - 10,000 M We. Chile and Uruguay have started strategic studies to place the nuclear power option in the future energy matrix of the country. The government of Chile set up, in 2007, a Task Group to determine whether nuclear power could be considered a viable option. This Group concluded that nuclear power is a mature, safe competitive, and low carbon emitter technology that could be considered a viable option. A Nuclear Advisory Group was created who made studies to install a nuclear power plant in the 2016-2021 time-span. In December 2008, the Uruguayan Government created a high level Working Group to establish the feasibility conditions for Nuclear Power Generation in the country. (Author)

  7. Using electricity options to hedge against financial risks of power producers

    DEFF Research Database (Denmark)

    Pineda Morente, Salvador; Conejo, Antonio J.

    2013-01-01

    or unexpected unit failures faced by power producers. A multi-stage stochastic model is described in this tutorial paper to determine the optimal forward and option contracting decisions for a risk-averse power producer. The key features of electricity options to reduce both price and availability risks......As a consequence of competition in electricity markets, a wide variety of financial derivatives have emerged to allow market agents to hedge against risks. Electricity options and forward contracts constitute adequate instruments to manage the financial risks pertaining to price volatility...

  8. Soviet Union's Nuclear Power Program

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Glasnost has dramatically increased the availability of information about the Soviet Union's nuclear industry. In the future, even more information is likely to become known as Soviet participation in international forums increases. Not only is much more general information now available, but up-to-date details are regularly provided, including information such as the Soviet nuclear industry's strategic direction and goals, recent reactor design changes, safety inspection results, and reports of public opposition and protest. This article summarizes the current status of the Soviet nuclear power program, reconciling the often conflicting reports from various public sources

  9. Indonesia - nuclear power as option for the future?

    International Nuclear Information System (INIS)

    Wiesegart, K.

    1993-01-01

    The Republic of Indonesia consists of 13.600 islands, about 6.000 of them are populated. More than half of the ca. 182 mio. inhabitants (1991) live on the main island Java which only has a share of 7% of the total area of the East Asian country. The developing country Indonesia is characterized by economic stability - according to the World Bank its chances to reach the circle of industrialized countries till the year 2000 are good. But electricity supply of the country lags behind overall economic development. Here about 20% of the demand can not be covered. There are high losses in energy production, transmission and distribution. The Indonesian government plans extensions in the power supply area, a doubling of 1991 capacities are strived for till 2000. Financially this is to be attained with the instruments denationalization and deregulation. Apart from coal, water power and geothermal energy now also nuclear power will be used. (orig.) [de

  10. Study of Power Options for Jupiter and Outer Planet Missions

    Science.gov (United States)

    Landis, Geoffrey A.; Fincannon, James

    2015-01-01

    Power for missions to Jupiter and beyond presents a challenging goal for photovoltaic power systems, but NASA missions including Juno and the upcoming Europa Clipper mission have shown that it is possible to operate solar arrays at Jupiter. This work analyzes photovoltaic technologies for use in Jupiter and outer planet missions, including both conventional arrays, as well as analyzing the advantages of advanced solar cells, concentrator arrays, and thin film technologies. Index Terms - space exploration, spacecraft solar arrays, solar electric propulsion, photovoltaic cells, concentrator, Fresnel lens, Jupiter missions, outer planets.

  11. An aqueous lithium salt blanket option for fusion power reactors

    Energy Technology Data Exchange (ETDEWEB)

    Steiner, D.; Varsamis, G. (Rensselaer Polytechnic Inst., Troy, NY (USA). Dept. of Nuclear Engineering and Engineering Physics); Deutsch, L.; Rathke, J. (Grumman Corp., Bethpage, NY (USA). Advanced Energy Systems); Gierszewski, P. (Canadian Fusion Fuels Technology Project (CFFTP), Mississauga, ON (Canada))

    1989-04-01

    An aqueous lithium salt blanket (ALSB) concept is proposed which could be the basis for either a power reactor blanket or a test module in an engineering test reactor. The design is based on an austenitic stainless steel structure, a beryllium multiplier, and a salt breeder concentration of about 32 g LiNO/sub 3/ per 100 cm/sup 3/ of H/sub 2/O. To limit tritium release rates, the salt breeder solution is separated from the water coolant circuit. The overall tritium system cost for a 2400 MW (fusion power) reactor is estimated to be 180 million Dollar US87 installed. (orig.).

  12. Balance-of-plant options for the Heat-Pipe Power System

    International Nuclear Information System (INIS)

    Berte, M.; Capell, B.

    1997-09-01

    The Heat-Pipe Power System (HPS) is a near-term, low-cost space fission power system with the potential for utilizing various option for balance-of-plant options. The following options have been studied: a low-power thermoelectric design (14-kWe output), a small Brayton cycle system (60--75 kWe), and a large Brayton cycle system (250 kWe). These systems were analyzed on a preliminary basis, including mass, volume, and structure calculations. These analyses have shown that the HPS system can provide power outputs from 10--250 kWe with specific powers of ∼ 14 W/kg for a 14-kWe model to ∼ 100 W/kg for a 250-kWe model. The system designs considered in this study utilize a common component base to permit easy expansion and development

  13. Nuclear options: is the climate right for nuclear power?

    International Nuclear Information System (INIS)

    Switkowski, Z.E.

    2009-01-01

    An increasing number of countries around the world are turning to nuclear power to meet growing demand for electricity, avoid use of fossil fuels, reduce greenhouse gas emissions and diversify their energy mix away from a dominant supplier. Australia is following a different path. Does this make strategic sense?

  14. Assessing South Africa's strategic options of soft power application ...

    African Journals Online (AJOL)

    This article argues that South Africa cannot accomplish its foreign policy objectives by itself and advocates the use of civic interest groups as a strategic tool of implementing soft power. In demonstrating the impact of civic interest groups as a foreign policy instrument, the article illustrates how globalisation has changed the ...

  15. Assessment of the environmental impact of available options in electric power development under Polish conditions

    International Nuclear Information System (INIS)

    Cofala, Janusz; ); Jankowski, Boleslaw

    1999-01-01

    The current European initiatives limiting environmental impacts of energy production and use are presented and the proposal emission levels together with benefits are given. The role of nuclear power in achieving environmental targets in the EU countries is stressed. Then a comparison of the following 3 major electricity production options: modern coal fired power plants, gas fired combined cycle power plants and nuclear power plants is done. In the comparison Polish conditions are taken into account

  16. Evaluation of plate type fuel options for small power reactors

    International Nuclear Information System (INIS)

    Andrzejewski, Claudio de Sa

    2005-01-01

    Plate type fuels are generally used in research reactor. The utilization of this kind of configuration improves significantly the overall performance fuel. The conception of new fuels for small power reactors based in plate-type configuration needs a complete review of the safety criteria originally used to conduce power and research reactor projects. In this work, a group of safety criteria is established for the utilization of plate-type fuels in small power reactors taking into consideration the characteristics of power and research reactors. The performance characteristics of fuel elements are strongly supported by its materials properties and the adopted configuration for its fissile particles. The present work makes an orientated bibliographic investigation searching the best material properties (structural materials and fuel compounds) related to the performance fuel. Looking for good parafermionic characteristics and manufacturing exequibility associated to existing facilities in national research centres, this work proposes several alternatives of plate type fuels, considering its utilization in small power reactors: dispersions of UO 2 in stainless steel, of UO 2 in zircaloy, and of U-Mo alloy in zircaloy, and monolithic plates of U-Mo cladded with zircaloy. Given the strong dependency of radiation damage with temperature increase, the safety criteria related to heat transfer were verified for all the alternatives, namely the DNBR; coolant temperature lower than saturation temperature; peak meat temperature to avoid swelling; peak fuel temperature to avoid meat-matrix reaction. It was found that all alternatives meet the safety criteria including the 0.5 mm monolithic U-Mo plate cladded with zircaloy. (author)

  17. 46 CFR 176.650 - Alternative Hull Examination Program options: Divers or underwater ROV.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Alternative Hull Examination Program options: Divers or...) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Hull and Tailshaft Examinations § 176.650 Alternative Hull Examination Program options: Divers or underwater ROV. To complete the...

  18. 46 CFR 115.650 - Alternative Hull Examination (AHE) Program options: Divers or underwater ROV.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Alternative Hull Examination (AHE) Program options... MORE THAN 49 PASSENGERS INSPECTION AND CERTIFICATION Hull and Tailshaft Examinations § 115.650 Alternative Hull Examination (AHE) Program options: Divers or underwater ROV. To complete your underwater...

  19. Costs for frequency reserve and regulation power options in Iceland

    International Nuclear Information System (INIS)

    2005-01-01

    The price for ancillary services that ensures an efficient use of resources is equal to the marginal costs of providing these services. In an expanding hydro power system there are two optimal designs for expansion; one design is optimal when ancillary services are not to be provided and another design is optimal when these services are to be provided. The right price for ancillary services cover the net difference in costs between the two designs. The difference in design in an expanding system is specific for that particular system and hence no general number can be specified. In an expanding hydro power system, the efficient price typically covers parts of the marginal investment costs for excess capacity in turbine and generator, but no investment costs for waterways and reservoirs

  20. Restructuring of the power sector in Romania - options and perspectives

    Energy Technology Data Exchange (ETDEWEB)

    Leca, A. [University Politechnica, Bucharest (Romania)

    1999-07-01

    Discusses the Romanian energy sector covering the situation under the Communist government and attempts at restructuring since the fall of Communism. Following the fall of Communism 1989, the power sector remained in State ownership and suffered problems such as a lack of a national energy strategy, a weak institutional framework, and the persistence of monopolistic relationships between suppliers and consumers. In 1997 a new government began a programme of energy reform aiming to, for example, improve energy efficiency, set up an institutional framework, reduce environmental impacts and re-evaluate generation capacities of existing plants and those under construction but political problems have slowed the process down. The paper suggests that privatisation is becoming the only solution to problems in the power sector caused by the deterioration of the economic and social situation in Romania. 8 figs., 1 tab.

  1. Vision of Nuclear Power Options for XXI Century

    Energy Technology Data Exchange (ETDEWEB)

    Adamov, E.; Muraviev, E.; Orlov, V.

    2007-07-01

    This work once again brings to attention the fundamental ideas of the long-term nuclear power development on the basis of the new generation of Fast neutron Reactors, naturally safe, economically attractive and employing the proliferation-resistant and low-waste fuel cycle. The Universal System Model (USM-1), new analytical research tool recently developed in N.A. Dollezhal Research and Design Institute of Power Engineering (Moscow, Russia) has been used to evaluate several scenarios (including traditional ones) of the World nuclear power development for electricity production within the XXI century. For scenarios comparison 3 criteria were used: the levelized cost of electricity, the fuel supply security (in terms of natural uranium total consumption and prospects for further fuel balance), and the potential hazard of radioactive wastes. The clear advantage of scenario with the most complete realization of the new Fast Reactors technology potential is revealed. The authors strongly believe that the prospects of this new technology worldwide implementation deserve the due attention of responsible governments and international organizations. 2 Tables, 13 Figures, 10 References. (auth)

  2. Options for shortening nuclear power plant refueling outages

    International Nuclear Information System (INIS)

    Kastl, H.

    2001-01-01

    Deregulation of the European electricity market on 01.01.1999 forced a large number of electric utilities- especially nuclear power plant operators - to find ways of drastically cutting down their costs in order to be able to compete successfully within the new market environment. Nuclear power plants currently in operation mainly have three potential ways of reducing their power generating costs: by increasing plant availability, reducing fuel costs and cutting down operating costs. The optimization of plant refueling outages offers considerable potential for enhancing plant availability, but also helps bring down operating costs by reducing expenditure on maintenance. In order to optimize an outage in terms of its duration and costs, a variety of approaches are possible - all of which, however, involve certain key factors such as good organization, planning, logistics and control, improvement of equipment and tools, as well as motivation of personnel. Another aspect is the introduction of innovative technologies. In the last few years, such technologies have frequently enabled maintenance effort to be reduced, thus saving considerable time, and have also resulted in a need for fewer personnel to carry out the work, thus reducing radiation exposure. In many instances they have also improved the quality of work and outage performance as a whole. The paper uses recent examples to show how innovative technologies can contribute to-wards reducing nuclear plant maintenance costs and shorten the duration of refueling out-ages. (author)

  3. German power options: Lack of clarity will be costly

    International Nuclear Information System (INIS)

    Schuelke, Christian

    2010-01-01

    The German environment minister Norbert Roettgen (CDU) revived the German debate about the future of nuclear power in February when he argued for a limited lifetime extension of Germany's nuclear plants. His statements created much dissent in his own party and with the coalition partner FDP. The government will not take a formal decision before the autumn, but the contradicting messages from inside the government send highly ambiguous signals to electricity utilities with investment plans in Germany. What does the German government want the companies to do?

  4. Reactivity control of nuclear power reactors: new options

    International Nuclear Information System (INIS)

    Alcala, F.

    1984-01-01

    Some actual aspects (referring to economy, non-proliferation and environmental impact) of nuclear power reactors has been analyzed from the point of view of the reactivity control physics. Specially studied have been the physical mechanisms related with the spectral shift control method and their general positive effects on those aspects. The analysis carried out suggested the application of the above method of control to reactors with non-hydrogenous fuel cells, which are mainly characterized by their high moderator/fuel ratio. Finally three different types of such fuel cells are presented and some results about one of them (belonging to a PHWR controlled by graphite rods) are given. (author)

  5. ENergy and Power Evaluation Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    In the late 1970s, national and international attention began to focus on energy issues. Efforts were initiated to design and test analytical tools that could be used to assist energy planners in evaluating energy systems, particularly in developing countries. In 1984, the United States Department of Energy (DOE) commissioned Argonne National Laboratory`s Decision and Information Sciences Division (DIS) to incorporate a set of analytical tools into a personal computer-based package for distribution in developing countries. The package developed by DIS staff, the ENergy and Power Evaluation Program (ENPEP), covers the range of issues that energy planners must face: economic development, energy demand projections, supply-and-demand balancing, energy system expansion, and environmental impact analysis. Following the original DOE-supported development effort, the International Atomic Energy Agency (IAEA), with the assistance from the US Department of State (DOS) and the US Department of Energy (DOE), provided ENPEP training, distribution, and technical support to many countries. ENPEP is now in use in over 60 countries and is an international standard for energy planning tools. More than 500 energy experts have been trained in the use of the entire ENPEP package or some of its modules during the international training courses organized by the IAEA in collaboration with Argonne`s Decision and Information Sciences (DIS) Division and the Division of Educational Programs (DEP). This report contains the ENPEP program which can be download from the internet. Described in this report is the description of ENPEP Program, news, forums, online support and contacts.

  6. The Nuclear Power Options for the Climate Change Dilemma

    International Nuclear Information System (INIS)

    Ibrahim, Y.M.; Hussein, A.S.

    2009-01-01

    The world population is currently about 6.5 billion and expected to reach 9 billion by 2050.This population increase and economic development will bring dramatic increase of energy demand in all over the world, especially in developing countries. Global electricity demand grows at 2.4% per year. To meet this growth, the worlds electricity generating capacity grows from about 3700 G We in 2004 to 7303 G We in 2030.The world may run short of fossil fuels, in particular oil. The protection of the global environment including the reduction of carbon dioxide emissions will be an important issue also. Nuclear energy is clean, safe, reliable and cost-effective, with many environmental benefits. It does not emit greenhouse gases that contribute to climate change, or combustion products and acid gases that cause air , water resource and land pollution. As of 14 January 2008 there were 439 nuclear power plants in operation around the world. They total about 372 G We of generating capacity and supply about 16% of the world electricity, 7 % of global energy. The present article briefly summaries the environmental aspects of the nuclear power and varies factors which support the attractiveness of it for many countries all over the world.

  7. Optimal feed-in tariff for solar photovoltaic power generation in China: A real options analysis

    International Nuclear Information System (INIS)

    Zhang, M.M.; Zhou, D.Q.; Zhou, P.; Liu, G.Q.

    2016-01-01

    The feed-in tariff policy is widely used to promote the development of renewable energy. China also adopts feed-in tariff policy to attract greater investment in solar photovoltaic power generation. This study employs real options method to assess the optimal levels of feed-in tariffs in 30 provinces of China. The uncertainties in CO_2 price and investment cost are considered. A method that integrates the backward dynamic programming algorithm and Least-Squares Monte Carlo method is used to solve the model. The results demonstrate that the feed-in tariffs of 30 provinces range from 0.68 RMB/kWh to 1.71 RMB/kWh, and the average level is 1.01 RMB/kWh. On this basis, we find that the levels of sub-regional feed-in tariff announced in 2013 are no longer appropriate and should be adjusted as soon as possible. We have also identified the implications of technological progress and carbon emission trading schemes, as well as the importance of strengthening electricity transmission. It has been suggested that the Chinese government takes diverse measures, including increasing research and development investment, establishing and improving a nationwide carbon emission trading scheme and accelerating the construction of electricity-transmission infrastructure, to reduce the required feed-in tariff and promote the development of solar photovoltaic power generation. - Highlights: • We estimate the optimal levels of feed-in tariffs for 30 provinces in China by using real options method. • The uncertainties in CO_2 price and investment cost are considered. • The feed-in tariffs of 30 provinces range from 0.68 RMB/kWh to 1.71 RMB/kWh, and the average level is 1.01 RMB/kWh.

  8. Nuclear Power Options Viability Study. Volume 1. Executive summary

    International Nuclear Information System (INIS)

    Trauger, D.B.; White, J.D.; Booth, R.S.

    1986-09-01

    Innovative reactor concepts are described and evaluated in accordance with criteria established in the study. The reactors to be studied were selected on the basis of three ground rules: (1) the potential for commercialization between 2000 to 2010, (2) economic competitiveness with coal, and (3) the degree of passive safety in the design. The concepts, classified by coolants, were light water reactors, liquid metal reactors, and high-temperature reactors, and most were of modular design. Although the information available is not adequate for a definitive evaluation of economic competitiveness, all of the concepts appear to be potentially viable in the time frame selected. Public and institutional acceptance of nuclear power was found to be affected primarily by four issues: (1) operational safety, (2) waste handling and disposal, (3) construction and operating costs, and (4) the adequacy of management and regulatory controls

  9. Nuclear power as a necessary option, albeit in insufficient one

    International Nuclear Information System (INIS)

    Altin, V.

    2007-01-01

    In this presentation a comparative assessment of known energy resources are made with respect to their energy densities. Fossil fuels have formed the foundation of a worldwide economic development realized throughout the 20th century. Their comparatively high energy densities have made faster energy flows and thereby higher power levels and speedy development possible. However, renewable sources that are already feasible have much lower levels of energy densities. Their large scale utilization in lieu of fossil fuels would necessitate either reduction of economic growth rates to 'sustainable' levels or speedy development of feasible large scale storage technologies. Nuclear energy appears to impose itself as a necessity to alleviate this transition period, albeit within the constraint of known uranium reserves an insufficient one

  10. Options for pricing ancillary services in a deregulated power system

    Science.gov (United States)

    Yamin, Hatim Yahya

    2001-07-01

    GENCOs in restructured systems are compensated for selling energy in the market. In a restructured market, a mechanism is required to entice participants in the market to provide ancillary services and to ensure adequate compensation that would guarantee its economic viability. The ISO controls the dispatch of generation, manages the reliability of the transmission grid, provides open access to the transmission, buys and provides ancillary services as required, coordinates day-ahead, hour-ahead schedules and performs real time balancing of load and generation, settles real time imbalances and ancillary services sales and purchases. The ISO, also, administers congestion management protocols for the transmission grid. Since the ISO does not own any generating units it must ensure that there is enough reserves for maintaining reliability according to FERC regulations, and sufficient unloaded generating capacity for balancing services in a real-time market. The ISO could meet these requirements by creating a competitive market for ancillary services, which are metered and remain unbundled to provide an accurate compensation for each supplier and cost to each consumer, In this study, we give an overview for restructuring and ancillary services in a restructured power marketplace. Also, we discuss the effect of GENCOs' actions in the competitive energy and ancillary service markets. In addition, we propose an auction market design for hedging ancillary service costs in California market. Furthermore, we show how to include the n-1 and voltage contingencies in security constrained unit commitment. Finally, we present two approaches for GENCOs' unit commitment in a restructured power market; one is based on game theory and the other is based on market price forecasting. In each of the two GENCOs' unit commitment approaches, we discuss the GENCOs' optimal bidding strategies in energy and ancillary service markets to maximize the GENCOs' profit.

  11. Renewable energy off-grid power systems: options for energy suppliers

    International Nuclear Information System (INIS)

    Trouchet, K.

    1992-01-01

    SURVIVOR ENERGY SYSTEMS package a range of wind-based renewable energy systems for the supply of 24-hour power to off-grid homesteads and communities. This paper presents a leasing package for these power users and illustrates their cost effectiveness in comparison with stand-alone diesel and comparative hybrid power options. This offer is seen as a alternative for energy planners and supply agencies for their off-grid clients. 6 refs., 3 tabs., 3 figs

  12. Electrical power supply and process heat supply options

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    This paper consists of an economic analysis in which three geothermal electricity production scenarios are evaluated. The first is a 400 MW facility using cost and production data developed in this study. The other two are 400 and 880 MW units using cost data from a separate State of Hawaii study made to evaluate the economic feasibility of an interisland submersible electricity cable. In all cases, the scenarios are evaluated using the same economic model described, but in this case also reflecting depletion allowances permitted by the tax code. The output price is measured as cents per kWh, assuming delivery of the power to a bulk buyer at the plant fence. The two cases reflecting the State of Hawaii study use lower capital costs, which result in lower electricity prices when evaluated through the economic model. Since the assumptions of these two cases were not developed under this study, the resulting price figures are not used as part of the base case integrated systems. Rather, they are presented only as a special case, and are used as one scenario in the sensitivity analyses of integrated systems

  13. QA programs in nuclear power plants

    International Nuclear Information System (INIS)

    Ellingson, A.C.

    1976-01-01

    As an overview of quality assurance programs in nuclear power plants, the energy picture as it appears today is reviewed. Nuclear power plants and their operations are described and an attempt is made to place in proper perspective the alleged ''threats'' inherent in nuclear power. Finally, the quality assurance programs being used in the nuclear industry are described

  14. Valuation of marginal CO2 abatement options for electric power plants in Korea

    International Nuclear Information System (INIS)

    Park, Hojeong; Lim, Jaekyu

    2009-01-01

    The electricity generation sector in Korea is under pressure to mitigate greenhouse gases as directed by the Kyoto Protocol. The principal compliance options for power companies under the cap-and-trade include the application of direct CO 2 emission abatement and the procurement of emission allowances. The objective of this paper is to provide an analytical framework for assessing the cost-effectiveness of these options. We attempt to derive the marginal abatement cost for CO 2 using the output distance function and analyze the relative advantages of emission allowance procurement option as compared to direct abatement option. Real-option approach is adopted to incorporate emission allowance price uncertainty. Empirical result shows the marginal abatement cost with an average of Euro 14.04/ton CO 2 for fossil-fueled power plants and confirms the existence of substantial cost heterogeneity among plants which is sufficient to achieve trading gains in allowance market. The comparison of two options enables us to identify the optimal position of the compliance for each plant. Sensitivity analyses are also presented with regard to several key parameters including the initial allowance prices and interest rate. The result of this paper may help Korean power plants to prepare for upcoming regulations targeted toward the reduction of domestic greenhouse gases.

  15. Space Solar Power Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Arif, Humayun; Barbosa, Hugo; Bardet, Christophe; Baroud, Michel; Behar, Alberto; Berrier, Keith; Berthe, Phillipe; Bertrand, Reinhold; Bibyk, Irene; Bisson, Joel; Bloch, Lawrence; Bobadilla, Gabriel; Bourque, Denis; Bush, Lawrence; Carandang, Romeo; Chiku, Takemi; Crosby, Norma; De Seixas, Manuel; De Vries, Joha; Doll, Susan; Dufour, Francois; Eckart, Peter; Fahey, Michael; Fenot, Frederic; Foeckersperger, Stefan; Fontaine, Jean-Emmanuel; Fowler, Robert; Frey, Harald; Fujio, Hironobu; Gasa, Jaume Munich; Gleave, Janet; Godoe, Jostein; Green, Iain; Haeberli, Roman; Hanada, Toshiya; Harris, Peter; Hucteau, Mario; Jacobs, Didier Fernand; Johnson, Richard; Kanno, Yoshitsugu; Koenig, Eva Maria; Kojima, Kazuo; Kondepudi, Phani; Kottbauer, Christian; Kulper, Doede; Kulagin, Konstantin; Kumara, Pekka; Kurz, Rainer; Laaksonen, Jyrki; Lang, Andrew Neill; Lathan, Corinna; Le Fur, Thierry; Lewis, David; Louis, Alain; Mori, Takeshi; Morlanes, Juan; Murbach, Marcus; Nagatomo, Hideo; O' brien, Ivan; Paines, Justin; Palaszewski, Bryan; Palmnaes, Ulf; Paraschivolu, Marius; Pathare, Asmin; Perov, Egor; Persson, Jan; Pessoa-Lopes, Isabel; Pinto, Michel; Porro, Irene; Reichert, Michael; Ritt-Fischer, Monika; Roberts, Margaret; Robertson II, Lawrence; Rogers, Keith; Sasaki, Tetsuo; Scire, Francesca; Shibatou, Katsuya; Shirai, Tatsuya; Shiraishi, Atsushi; Soucaille, Jean-Francois; Spivack, Nova; St. Pierre, Dany; Suleman, Afzal; Sullivan, Thomas; Theelen, Bas Johan; Thonstad, Hallvard; Tsuji, Masatoshi; Uchiumi, Masaharu; Vidqvist, Jouni; Warrell, David; Watanabe, Takafumi; Willis, Richard; Wolf, Frank; Yamakawa, Hiroshi; Zhao, Hong

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  16. The role of managerial stock option programs in governance: evidence from REIT stock repurchases

    NARCIS (Netherlands)

    Ghosh, C.; Giambona, E.; Harding, J.P.; Sezer, O.; Sirmans, C.F.

    2010-01-01

    This article examines the role of stock option programs and executive holdings of stock options in real estate investment trust (REIT) governance. We study the issue by analyzing how the market reaction to a stock repurchase announcement varies as a function of the individual REIT's governance

  17. A Review of Research Methods Used to Examine Employee Assistance Program Delivery Options.

    Science.gov (United States)

    Csiernik, Rick

    1995-01-01

    This review of literature on Employee Assistance Programs (EAPs) focuses on EAP delivery options. More than half of the 48 studies reviewed used a case study approach. EAPs provided by on-staff professionals were the most frequently discussed delivery option, although this is not the most dominant form of EAP provision. (SLD)

  18. Green Power Partnership Related Programs & Organizations

    Science.gov (United States)

    The U.S. EPA's Green Power Partnership is a voluntary program designed to reduce the environmental impact of electricity generation by promoting renewable energy. This page provides a brief program overview, including vision and accomplishments.

  19. Cost-effective design of ringwall storage hybrid power plants: A real options analysis

    International Nuclear Information System (INIS)

    Weibel, Sebastian; Madlener, Reinhard

    2015-01-01

    Highlights: • Economic viability, optimal size, and siting of a hybrid ringwall hydro power plant. • Real options analysis for optimal investment timing and stochastic storage volumes. • Stochastic PV and solar power production affects optimal size of the storage device. • Monte Carlo simulation is used for wind/solar power, el. price, and investment cost. • Numerical computations for two different hybrid ringwall storage plant scenarios. - Abstract: We study the economic viability and optimal sizing and siting of a hybrid plant that combines a ringwall hydro storage system with wind and solar power plants (ringwall storage hybrid power plant, RSHPP). A real options model is introduced to analyze the economics of an onshore RSHPP, and in particular of the varying storage volume in light of the stochastic character of wind and solar power, as well as the optimal investment timing under uncertainty. In fact, many uncertainties arise in such a project. Energy production is determined by the stochastic character of wind and solar power, and affects the optimal size of the storage device. Monte Carlo simulation is performed to analyze the following sources of uncertainty: (i) wind intensity and solar irradiation; (ii) future electricity price; and (iii) investment costs. The results yield the optimal size of the storage device; the energy market on which the operator should sell the electricity generated; numerical examples for two different RSHPP scenarios; and a real options model for analyzing the opportunity to defer the project investment and thus to exploit the value of waiting

  20. Secure optionally passive RFID tag or sensor with external power source and data logging

    Science.gov (United States)

    Nekoogar, Faranak; Reynolds, Matthew; Lefton, Scott; Dowla, Farid; Twogood, Richard

    2016-05-31

    A secure optionally passive RFID tag or sensor system comprises a passive RFID tag having means for receiving radio signals from at least one base station and for transmitting radio signals to at least one base station, where the tag is capable of being powered exclusively by received radio energy, and an external power and data logging device having at least one battery and electronic circuitry including a digital memory configured for storing and recalling data. The external power and data logging device has a means for powering the tag, and also has a means.

  1. India's power program and its concern over environmental safety

    International Nuclear Information System (INIS)

    Prasad, G.E.; Mittra, J.

    2001-01-01

    India's need of electrical power is enormous and per capita consumption of power is to be increased at least by ten times to reach the level of world average. Thermal Power generation faces two fold problems. First, there is scarcity of good quality fuel and second, increasing environmental pollution. India's self reliant, three stage, 'closed-fuel-cycle' nuclear power program is promising better solution to the above problems. To ensure Radiation Protection and Safety of Radiation Sources, Indian Nuclear Power program emphasizes upon design and engineering safety by incorporating necessary safety features in the design, operational safety through structured training program and typically through software packages to handle rare unsafe events and regulation by complying safety directives. A health survey among the radiation workers indicates that there is no extra threat to the public from nuclear power program. Based on latest technology, as available in case of nuclear power option, it is quite possible to meet high energy requirement with least impact on the environment.. (authors)

  2. India's power programs and its concern over environmental safety

    International Nuclear Information System (INIS)

    Prasad, G.E.; Mittra, J.; Sarma, M.S.R.

    2000-01-01

    India's need for electrical power is enormous and per capita consumption of power is to be increased at least by 10 times to reach the level of the world average. Thermal power generation faces two-fold problems. First, there is scarcity of good quality fuel and second, increasing environmental pollution. India 's self reliant, . three stage, 'closed-fuel-cycle' nuclear power program is promising a better solution to the above problems. To ensure Radiation Protection and Safety of Radiation Sources, the Indian Nuclear Power program emphasizes upon design and engineering safety by incorporating' necessary safety features in the design, operational safety through a structured training program and typically through software packages to handle rare unsafe events and regulation by complying safety directives. A health survey among the radiation workers indicates that there is no extra threat to the public from the nuclear power program. Based on the latest technology, as available in case of the nuclear power option, it is quite possible to meet high energy requirements with least impact on the environment. (authors)

  3. Orion's Powered Flight Guidance Burn Options for Near Term Exploration Missions

    Science.gov (United States)

    Fill, Thomas; Goodman, John; Robinson, Shane

    2018-01-01

    NASA's Orion exploration spacecraft will fly more demanding mission profiles than previous NASA human flight spacecraft. Missions currently under development are destined for cislunar space. The EM-1 mission will fly unmanned to a Distant Retrograde Orbit (DRO) around the Moon. EM-2 will fly astronauts on a mission to the lunar vicinity. To fly these missions, Orion requires powered flight guidance that is more sophisticated than the orbital guidance flown on Apollo and the Space Shuttle. Orion's powered flight guidance software contains five burn guidance options. These five options are integrated into an architecture based on a proven shuttle heritage design, with a simple closed-loop guidance strategy. The architecture provides modularity, simplicity, versatility, and adaptability to future, yet-to-be-defined, exploration mission profiles. This paper provides a summary of the executive guidance architecture and details the five burn options to support both the nominal and abort profiles for the EM-1 and EM-2 missions.

  4. Environmental Issues in the Power Sector : Long-Term Impacts and Policy Options for Karnataka

    OpenAIRE

    World Bank

    2004-01-01

    This study of the long-term environmental impacts and policy options for power sector development in Karnataka, is one of a series undertaken by the Bank, in cooperation with the Government of India and state governments. It is a follow-up to the broader study Environmental Issues in the Power Sector (EIPS) (ESMAP/World Bank 1998), and the general methodology developed for EIPS, is used fo...

  5. Nontraditional Degree Options for Nurses: A Model Program

    Science.gov (United States)

    Walston, Sydney C.

    1978-01-01

    The Institute for Personal and Career Development of Central Michigan University offers external degree programs for adult learners using nontraditional study. The competency-based programs described include credit given for the educational background and relevant career-life experiences of registered nurses in Michigan. (Author/LBH)

  6. Analysis of Nuclear Option in Planning on Java Bali Integrated Electricity System By Using Message Program

    International Nuclear Information System (INIS)

    Masdin; Sudi-Ariyanto; Nuryanti

    2004-01-01

    The growth of national energy demand in the future still become a great challenge for energy supply sector in Indonesia. The current energy supply strategy focuses the development and diversification of all energy options including fossil fuel, renewable energy and nuclear energy. Based on the Comprehensive Assessment Of Different Energy Source For Electricity Demand Study (CADES), final energy demand will grow from 4,065 PJ in 2000 to about 8,200 PJ in 2025. In this paper, the analysis of national energy system network will be divided into 2 regions, namely Java Bali region and Outside Java Bali region. Period of time horizon chosen in this study is 25 years (2000 to 2025). Simulation of network system configuration based on minimum objective function criteria was done by using MESSAGE (Model for Energy Supply Strategy Alternatives and their General Environmental Impacts) computer program. The focus of the analysis in this paper is simulation of electricity planning sector for Java Bali region. The result of simulation shows that for scenarios with no limitation on all fuel for power plant, scenario where fuel oil as constant supply for power plant and also configuration with limitation on gas supply, Nuclear Power Plant (NPP) does not appear during the study period using cost parameter set in this study. If there are limitations on gas supply and constrains of emissions (SO 2 and CO 2 ) due to coal combustion, NPP would become competitive and appear at about year 2015. (author)

  7. Manual of the Option.com program (ion optics); Manual del programa Option.com

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez B, M

    1991-02-15

    The laws that govern the trajectory that follow the charged particles in the hole, inside magnetic fields (to first approach) are similar to those of the geometric classic optics by it to observe a graph of the trajectories gives an excellent understanding of that is happening to the beam. The object of this program is that besides providing the numeric data of the solution of the problem of the transverse section of the beam, be also shown a graph of the trajectories but external regarding the optic axis in the treated region and aid the user asking in the case of a system of two quadrupoles, where it is wanted to focus the beam. (Author)

  8. EPRI nuclear power plant decommissioning technology program

    International Nuclear Information System (INIS)

    Kim, Karen S.; Bushart, Sean P.; Naughton, Michael; McGrath, Richard

    2011-01-01

    The Electric Power Research Institute (EPRI) is a non-profit research organization that supports the energy industry. The Nuclear Power Plant Decommissioning Technology Program conducts research and develops technology for the safe and efficient decommissioning of nuclear power plants. (author)

  9. 2014 Water Power Program Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-08-18

    The Water Power Peer Review Meeting was held February 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of 96 projects of the Water Power Program, as well as the productivity and management effectiveness of the Water Power Program itself.

  10. Quality assurance program for isotopic power systems

    Energy Technology Data Exchange (ETDEWEB)

    Hannigan, R.L.; Harnar, R.R.

    1982-12-01

    This report summarizes the Sandia National Laboratories Quality Assurance Program that applies to non-weapon (reimbursable) Radioisotopic Thermoelectric Generators. The program has been implemented over the past 16 years on power supplies used in various space and terrestrial systems. The quality assurance (QA) activity of the program is in support of the Department of Energy, Office of Space Nuclear Projects. Basic elements of the program are described in the report and examples of program decumentation are presented.

  11. Quality assurance program for isotopic power systems

    International Nuclear Information System (INIS)

    Hannigan, R.L.; Harnar, R.R.

    1982-12-01

    This report summarizes the Sandia National Laboratories Quality Assurance Program that applies to non-weapon (reimbursable) Radioisotopic Thermoelectric Generators. The program has been implemented over the past 16 years on power supplies used in various space and terrestrial systems. The quality assurance (QA) activity of the program is in support of the Department of Energy, Office of Space Nuclear Projects. Basic elements of the program are described in the report and examples of program decumentation are presented

  12. The role of power and politics in the repricing of executive options.

    OpenAIRE

    Wade, J. B.; Pollock, T.; Fischer, H. M.; Harald, M.

    2002-01-01

    We explore how CEO power affects the repricing of executive options. The spread between an option's exercise, or strike, price, and the market value of a stock impacts the likelihood of repricing. This effect is enhanced when the CEO of the firm in question is also the chairman of its board. Firm and CEO visibility, more board members appointed after a CEO's hiring than before it, a staggered board, and relatively high percentages of CEO and institutional ownership reduce the impact of the sp...

  13. Combined Heat and Power (CHP) as a Compliance Option under the Clean Power Plan: A Template and Policy Options for State Regulators

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-07-30

    Combined Heat and Power (CHP) is an important option for states to consider in developing strategies to meet their emission targets under the US Environmental Protection Agency's Clean Power Plan. This Template is designed to highlight key issues that states should consider when evaluating whether CHP could be a meaningful component of their compliance plans. It demonstrates that CHP can be a valuable approach for reducing emissions and helping states achieve their targets. While the report does not endorse any particular approach for any state, and actual plans will vary dependent upon state-specific factors and determinations, it provides tools and resources that states can use to begin the process, and underscores the opportunity CHP represents for many states. . By producing both heat and electricity from a single fuel source, CHP offers significant energy savings and carbon emissions benefits over the separate generation of heat and power, with a typical unit producing electricity with half the emissions of conventional generation. These efficiency gains translate to economic savings and enhanced competitiveness for CHP hosts, and emissions reductions for the state, along with helping to lower electric bills; and creating jobs in the design, construction, installation and maintenance of equipment. In 2015, CHP represents 8 percent of electric capacity in the United States and provides 12 percent of total power generation. Projects already exist in all 50 states, but significant technical and economic potential remains. CHP offers a tested way for states to achieve their emission limits while advancing a host of ancillary benefits.

  14. Impacts on power reactor health physics programs

    International Nuclear Information System (INIS)

    Meyer, B.A.

    1991-01-01

    The impacts on power reactor health physics programs form implementing the revised 10 CFR Part 20 will be extensive and costly. Every policy, program, procedure and training lesson plan involving health physics will require changes and the subsequent retraining of personnel. At each power reactor facility, hundreds of procedures and thousands of people will be affected by these changes. Every area of a power reactor health physics program will be affected. These areas include; ALARA, Respiratory Protection, Exposure Control, Job Coverage, Dosimetry, Radwaste, Effluent Accountability, Emergency Planning and Radiation Worker Training. This paper presents how power reactor facilities will go about making these changes and gives possible examples of some of these changes and their impact on each area of power reactor health physics program

  15. The NASA CSTI High Capacity Power Program

    International Nuclear Information System (INIS)

    Winter, J.M.

    1991-09-01

    The SP-100 program was established in 1983 by DOD, DOE, and NASA as a joint program to develop the technology necessary for space nuclear power systems for military and civil applications. During 1986 and 1987, the NASA Advanced Technology Program was responsible for maintaining the momentum of promising technology advancement efforts started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for future space applications. In 1988, the NASA Advanced Technology Program was incorporated into NASA's new Civil Space Technology Initiative (CSTI). The CSTI program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA advanced technology project, and provides a bridge to the NASA exploration technology programs. The elements of CSTI high capacity power development include conversion systems: Stirling and thermoelectric, thermal management, power management, system diagnostics, and environmental interactions. Technology advancement in all areas, including materials, is required to provide the growth capability, high reliability, and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall program will develop and demonstrate the technology base required to provide a wide range of modular power systems while minimizing the impact of day/night operations as well as attitudes and distance from the Sun. Significant accomplishments in all of the program elements will be discussed, along with revised goals and project timelines recently developed

  16. The role of nuclear power in the option zero emission technologies for fossil fuels

    International Nuclear Information System (INIS)

    Corak, Z.

    2006-01-01

    The energy sector is one of the main sources of greenhouse gas (GHG) emissions particularly carbon dioxide (CO2) increasing concerns due to their potential risk to induce global warming and climate change. The Parties having signed the Kyoto Protocol in December 1997, committed to decrease their GHG emissions. The Protocol states that countries shall undertake promotion, research, development and increased use of new and renewable forms of energy, of carbon dioxide sequestration technologies and of advanced and innovative environmentally sound technologies. The one significant option that is not specifically mentioned is nuclear energy which is essentially carbon-free. There are a number of technical options that could help reducing, or at least slowing the increase of, GHG emissions from the energy sector. The list of options includes: improving the efficiency of energy conversion and end-use processes; shifting to less carbon intensive energy sources (e.g. shifting from coal to natural gas); developing carbon-free or low-carbon energy sources; and carbon sequestration (e.g. planting forests or capturing and storing carbon dioxide). It must be pointed out that nuclear power is one of the few options that are currently available on the market, competitive in a number of countries, especially if global costs to society of alternative options are considered; practically carbon-free; and sustainable at large-scale deployment. The nuclear power could play significant role in alleviating the risk of global climate change. The main objective of the article is to present sequestration options, their cost evaluation as well as comparation with alternative possibilities of nuclear energy production. (author)

  17. Quality assurance program for nuclear power plants

    International Nuclear Information System (INIS)

    Gamon, T.H.

    1976-02-01

    The Topical Report presented establishes and provides the basis for the Brown and Root Quality Assurance Program for Nuclear Power Plants from which the Brown and Root Quality Assurance Manual is prepared and implemented. The Quality Assurance Program is implemented by the Brown and Root Power Division during the design, procurement, and construction phases of nuclear power plants. The Brown and Root Quality Assurance Program conforms to the requirements of Nuclear Regulatory Commission Regulation 10 CFR 50, Appendix B; to approved industry standards such as ANSI N45.2 and ''Daughter Standards''; or to equivalent alternatives as indicated in the appropriate sections of the report

  18. Quality assurance program for nuclear power plants

    International Nuclear Information System (INIS)

    Gamon, T.H.

    1976-06-01

    This topical report establishes and provides the basis for the Brown and Root Quality Assurance Program for Nuclear Power Plants from which the Brown and Root Quality Assurance Manual is prepared and implemented. The Quality Assurance Program is implemented by the Brown and Root Power Division during the design, procurement, and construction phases of nuclear power plants. The Brown and Root Quality Assurance Program conforms to the requirements of Nuclear Regulatory Commission Regulation 10 CFR 50, Appendix B; to approved industry standards such as ANSI N45.2 and ''Daughter Standards''; or to equivalent alternatives as indicated in the appropriate sections of this report

  19. A Comparison of Fission Power System Options for Lunar and Mars Surface Applications

    International Nuclear Information System (INIS)

    Mason, Lee S.

    2006-01-01

    This paper presents a comparison of reactor and power conversion design options for 50 kWe class lunar and Mars surface power applications with scaling from 25 to 200 kWe. Design concepts and integration approaches are provided for three reactor-converter combinations: gas-cooled Brayton, liquid-metal Stirling, and liquid-metal thermoelectric. The study examines the mass and performance of low temperature, stainless steel based reactors and higher temperature refractory reactors. The preferred system implementation approach uses crew-assisted assembly and in-situ radiation shielding via installation of the reactor in an excavated hole. As an alternative, self-deployable system concepts that use earth-delivered, on-board radiation shielding are evaluated. The analyses indicate that among the 50 kWe stainless steel reactor options, the liquid-metal Stirling system provides the lowest mass at about 5300 kg followed by the gas-cooled Brayton at 5700 kg and the liquid-metal thermoelectric at 8400 kg. The use of a higher temperature, refractory reactor favors the gas-cooled Brayton option with a system mass of about 4200 kg as compared to the Stirling and thermoelectric options at 4700 kg and 5600 kg, respectively. The self-deployed concepts with on-board shielding result in a factor of two system mass increase as compared to the in-situ shielded concepts

  20. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  1. Waste heat recovery options in a large gas-turbine combined power plant

    Science.gov (United States)

    Upathumchard, Ularee

    This study focuses on power plant heat loss and how to utilize the waste heat in energy recovery systems in order to increase the overall power plant efficiency. The case study of this research is a 700-MW natural gas combined cycle power plant, located in a suburban area of Thailand. An analysis of the heat loss of the combustion process, power generation process, lubrication system, and cooling system has been conducted to evaluate waste heat recovery options. The design of the waste heat recovery options depends to the amount of heat loss from each system and its temperature. Feasible waste heat sources are combustion turbine (CT) room ventilation air and lubrication oil return from the power plant. The following options are being considered in this research: absorption chillers for cooling with working fluids Ammonia-Water and Water-Lithium Bromide (in comparison) and Organic Rankine Cycle (ORC) with working fluids R134a and R245fa. The absorption cycles are modeled in three different stages; single-effect, double-effect and half-effect. ORC models used are simple ORC as a baseline, ORC with internal regenerator, ORC two-phase flash expansion ORC and ORC with multiple heat sources. Thermodynamic models are generated and each system is simulated using Engineering Equation Solver (EES) to define the most suitable waste heat recovery options for the power plant. The result will be synthesized and evaluated with respect to exergy utilization efficiency referred as the Second Law effectiveness and net output capacity. Results of the models give recommendation to install a baseline ORC of R134a and a double-effect water-lithium bromide absorption chiller, driven by ventilation air from combustion turbine compartment. The two technologies yield reasonable economic payback periods of 4.6 years and 0.7 years, respectively. The fact that this selected power plant is in its early stage of operation allows both models to economically and effectively perform waste heat

  2. Identification of the real options in a program of nuclear plants

    International Nuclear Information System (INIS)

    Camacho G, D.; Diaz N, M. J.; Reinking C, A.

    2008-01-01

    The development of our societies and our economies this intimately related to electric power and this as well with the generating sources, due to the projection of world-wide growth should go associate with a strategy of growth of energy generation. Considering to the nuclear power as an option to satisfy the energy needs that a country can provide two main immediate benefits: The stabilization of prices of security of provision of electric power of the nation. The care of the environment, since the gas discharges greenhouse are almost null. At the moment nuclear energy represents economically a viable option for the capital investment, taking into account the development from technology, the policies implemented by the state and the prices of other fuels. Due to the great investment that its require for the nuclear plants are necessary to use financial tools that allow to analyze the future scenes in which ours investment can be seen affected and to value the flexibility of being able to enlarge, to postpone or to stop our project in order to have majors profits or to diminish the lost ones. This valuation of the flexibility can be obtained from the called method Real Options. By analysis of Real Options the process is understood to apply to the methodology of the Financial Options to the valuation of projects or the management of real assets. The Real Options appear in flexible plans, projects, activities or enterprise investments, like for example, to leave or to sell the investment project before concluding it, changing to their use or its technology, to prolong their life, the option to choose, one or the other capacity, among others possibilities. In this work is an example of the application of the method of Real Options in the decision to invest or to defer the investment for the construction of a nuclear plant following the behavior of the tariffs in the market or the costs of generation of other technologies with which a nuclear plant competes. (Author)

  3. Manual of the Option.com program (ion optics)

    International Nuclear Information System (INIS)

    Fernandez B, M.

    1991-02-01

    The laws that govern the trajectory that follow the charged particles in the hole, inside magnetic fields (to first approach) are similar to those of the geometric classic optics by it to observe a graph of the trajectories gives an excellent understanding of that is happening to the beam. The object of this program is that besides providing the numeric data of the solution of the problem of the transverse section of the beam, be also shown a graph of the trajectories but external regarding the optic axis in the treated region and aid the user asking in the case of a system of two quadrupoles, where it is wanted to focus the beam. (Author)

  4. Exploring the options for carbon dioxide mitigation in Turkish electric power industry: System dynamics approach

    International Nuclear Information System (INIS)

    Saysel, Ali Kerem; Hekimoğlu, Mustafa

    2013-01-01

    Electric power industry has a huge carbon mitigation potential, fundamentally because there are large carbon-free, renewable resource options. In Turkey, with growing demand in electricity consumption and incentives offered for natural gas fired electricity generation, CO 2 emissions sourced from electric power industry had tripled over the last two decades. Current governmental strategy focuses on energy security and resource diversity in a growing economy and does not articulate sufficient mitigation targets and appropriate regulations. In this research, an original dynamic simulation model is built, validated and analyzed to explore the options for carbon mitigation in Turkish electric power industry. Model structure represents the investment, dispatch and pricing heuristics as well as the natural resource base of electricity generation in Turkey. It operates on annual basis over 30 years to simulate installed capacities and generations of power plants with alternative resources and their resulting CO 2 emissions. The analysis presented in this paper reveals that there are mitigation options below 50% of business as usual growth, with common policy options such as feed-in-tariffs, investment subsidies and carbon taxes. The model can serve as an experimental platform for further analysis of problems related to carbon mitigation in Turkish electricity sector. - Highlights: • An original computer model is created to investigate carbon mitigation. • It is holistic and comprises investment, generation, dispatch, and resources. • The model's structure, information base and foresights are specific to Turkey. • Direct and indirect strategies are explored and integrated. • Dramatic reductions are possible only with supply side strategies

  5. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  6. Program and Policy Options for Preventing Obesity in China

    Science.gov (United States)

    Huijun, Wang; Fengying, Zhai

    2014-01-01

    By 2002, China’s prevalence of overweight and obesity among adults was 18.9 percent and 2.9 percent, respectively. The Chinese traditional diet has been replaced by the “Western diet” and major declines in all phases of activity and increased sedentary activity as the main reasons explaining the rapid increase in overweight and obesity, bring major economic and health costs. The Nutrition Improvement Work Management Approach was released in 2010. Overweight and obesity prevention-related policies were added to national planning for disease prevention and control. The Guidelines for Prevention and Control of Overweight and Obesity of Chinese Adults and the School-age Children and Teenagers Overweight and Obesity Prevention and Control Guidelines in China were promulgated in 2003 and 2007, respectively. Few education programs have been implemented. Selected academic intervention research projects dominate with a focus on reducing child obesity and promoting healthier diets; increasing physical activity and reducing sedentary time; and facilitating changes in family, school, social, and cultural environments. Intervention samples are small and have not addressed the increasing rates of obesity throughout the entire population. Government provision of effective policy measures, multisectoral cooperation and increasing corporate social responsibility are keys to curb the trend toward overweight and obesity in China. PMID:24102781

  7. Preserving the nuclear option: The AIAA position paper on space nuclear power

    International Nuclear Information System (INIS)

    Allen, D.M.; Bennett, G.L.; El-Genk, M.S.; Newhouse, A.R.; Rose, M.F.; Rovang, R.D.

    1996-01-01

    In response to published reports about the decline in funding for space nuclear power, the Board of Directors of the American Institute of Aeronautics and Astronautics (AIAA) approved a position paper in March 1995 that recommends (1) development and support of an integrated space nuclear power program by DOE, NASA and DoD; (2) Congressional support for the program; (3) advocacy of the program by government and industry leaders; and (4) continuation of cooperation between the U.S. and other countries to advance nuclear power source technology and to promote safety. This position paper has been distributed to various people having oversight of the U.S. space nuclear power program. copyright 1996 American Institute of Physics

  8. Nuclear power program and environment

    International Nuclear Information System (INIS)

    Subramanya, S.K.; Gupta, J.P.

    2012-01-01

    Access to energy is one of the basic requirements for human development. To meet these growing energy needs without creating negative side effects is a challenge. The possibility of global climate change resulting from an increase in GHG concentrations in the atmosphere due to developmental activities is a major global concern. India is passing through the process of economic growth. Although India has not created the problem of climate change, India stands ready to be a part of the solution. The largest chunk of emissions was from electricity generation amounting to 65 percent of the total CO 2 equivalent emissions from the energy sector. Nuclear energy and renewables stand as sources for electricity with minimum GHG emission. Production of electricity from any form of primary energy has some environmental effect. A balanced assessment is needed. Nuclear power is of importance to India because it has potentially unlimited resource base, does not emit GHGs and, depending on location, has potentially favourable economics versus coal. In the long term, if we are to preserve the environment, it will be necessary to tap this source to the maximum extent feasible, In nuclear power stations, all its wastes are contained. India being home to nearly a third of the entire world's thorium, the strategies for large scale deployment of nuclear energy is focused towards utilization of thorium. The electricity potential of 3-stage programme is estimated to be about 2 lakh GWe-yr. Nuclear Power Corporation of India Limited is currently operating 20 reactors and has accumulated more than 337 reactor-years of experience in safe operation. A defence-in-depth approach is at the heart of safety philosophy, where there are several lines of defence, one backing another. Radiation is relevant for nuclear, coal, oil, gas and geothermal power plants. The essential task is to prevent excessive amounts now or in the future. One of the guiding principles adopted is to ensure that radiation

  9. HUD PowerSaver Pilot Loan Program

    Energy Technology Data Exchange (ETDEWEB)

    Zimring, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hoffman, Ian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2010-12-10

    The U.S. Department of Housing and Urban Development (HUD) recently announced the creation of a pilot loan program for home energy improvements. The PowerSaver loan program is a new, energy-focused variant of the Title I Property Improvement Loan Insurance Program (Title I Program) and is planned for introduction in early 2011. The PowerSaver pilot will provide lender insurance for secured and unsecured loans up to $25,000 to single family homeowners. These loans will specifically target residential energy efficiency and renewable energy improvements. HUD estimates the two-year pilot will fund approximately 24,000 loans worth up to $300 million; the program is not capped. The Federal Housing Administration (FHA), HUD's mortgage insurance unit, will provide up to $25 million in grants as incentives to participating lenders. FHA is seeking lenders in communities with existing programs for promoting residential energy upgrades.

  10. Accreditation of emerging oral health professions: options for dental therapy education programs.

    Science.gov (United States)

    Gelmon, Sherril B; Tresidder, Anna Foucek

    2011-01-01

    The study explored the options for accreditation of educational programs to prepare a new oral health provider, the dental therapist. A literature review and interviews of 10 content experts were conducted. The content experts represented a wide array of interests, including individuals associated with the various dental stakeholder organizations in education, accreditation, practice, and licensure, as well as representatives of non-dental accrediting organizations whose experience could inform the study. Development of an educational accreditation program for an emerging profession requires collaboration among key stakeholders representing education, practice, licensure, and other interests. Options for accreditation of dental therapy education programs include establishment of a new independent accrediting agency; seeking recognition as a committee within the Commission on Accreditation of Allied Health Education Programs; or working with the Commission on Dental Accreditation (CODA) to create a new accreditation program within CODA. These options are not mutually exclusive, and more than one accreditation program could potentially exist. An educational accreditation program is built upon a well-defined field, where there is a demonstrated need for the occupation and for accreditation of educational programs that prepare individuals to enter that occupation. The fundamental value of accreditation is as one player in the overall scheme of improving the quality of higher education delivered to students and, ultimately, the delivery of health services. Leaders concerned with the oral health workforce will need to consider future directions and the potential roles of new oral health providers as they determine appropriate directions for educational accreditation for dental therapy.

  11. Valuation of wind power distributed generation by using Longstaff–Schwartz option pricing method

    International Nuclear Information System (INIS)

    Díaz, Guzmán; Moreno, Blanca; Coto, José; Gómez-Aleixandre, Javier

    2015-01-01

    Highlights: • We analyze the economic value of wind power distributed generation (DG) projects. • Unlike NPV, RO approach accounts for the flexibility for decision-making. • We adapt Longstaff–Schwartz (LS) option pricing to multivariate wind power setting. • LS finds optimal times for DG investment under revenue uncertainty and decaying costs. • We find this method best suited for valuating DG projects of expected low revenue. - Abstract: In the context of decaying capital cost and uncertain revenues, prospective valuation of a wind power distributed generation (DG) project is difficult. The conventional net present value (NPV) presents a static picture that does not account for the value of waiting for better market conditions to proceed with a DG investment. On the contrary, real options (RO) analysis does account for the managerial flexibility to switch between options over the investment horizon. In this paper we argue that the value of a DG wind-based project can be revisited by means of Longstaff–Schwartz method, originally intended for the evaluation of American financial options. The adaption of this method to the wind power DG setting provides a means for (i) efficiently dealing with the several stochastic processes involved (spot electricity prices and possibly various wind speed processes) avoiding the curse of dimensionality, (ii) accounting for the decaying capital cost of DG, and (iii) solving the perfect foresight problem presented by Monte Carlo conventional simulations. We present in this paper the procedure to follow when applying the method to the wind power DG setting. Particularly, we discuss the standardization of the wind speed and spot price processes, and the advantages of building a state space model that includes all the correlated processes by adequately transforming Box–Jenkins and Ornstein–Uhlenbeck models. Also we discuss the representation of the capital cost forecast by means of learning curves. On the whole, we

  12. Analytical pricing of geometric Asian power options on an underlying driven by a mixed fractional Brownian motion

    Science.gov (United States)

    Zhang, Wei-Guo; Li, Zhe; Liu, Yong-Jun

    2018-01-01

    In this paper, we study the pricing problem of the continuously monitored fixed and floating strike geometric Asian power options in a mixed fractional Brownian motion environment. First, we derive both closed-form solutions and mixed fractional partial differential equations for fixed and floating strike geometric Asian power options based on delta-hedging strategy and partial differential equation method. Second, we present the lower and upper bounds of the prices of fixed and floating strike geometric Asian power options under the assumption that both risk-free interest rate and volatility are interval numbers. Finally, numerical studies are performed to illustrate the performance of our proposed pricing model.

  13. Role of nuclear option in sustainable power system planning in Croatia

    International Nuclear Information System (INIS)

    Tomsic, Z.; Kovacevic, T.; Feretic, D.

    1998-01-01

    To support the projected economic growth, electricity consumption in Croatia should rise by an average annual rate of at least 2.3% till the year 2030. After examining the potentials of new renewable energy sources (wind and solar energy and biomass) for large-scale electricity generation, projections of the required new generating capacities are made and possible developing scenarios of Croatian power system created. Nuclear and non-nuclear expansion options are analyzed, and optimal capacity and generation mixes are found on the basis of annual production costs and the assumption that the natural gas availability is limited. Emissions of SO 2 , NO x , particulates and CO 2 to the atmosphere in both options are calculated. Apart from that, it is analyzed how the hypothetical introduction of a CO 2 emission charge would affect the optimal capacity mix. (author)

  14. Wind power integration using individual heat pumps – Analysis of different heat storage options

    DEFF Research Database (Denmark)

    Hedegaard, Karsten; Mathiesen, Brian Vad; Lund, Henrik

    2012-01-01

    Significant installations of individual heat pumps are expected in future energy systems due to their economic competitiveness. This case study of the Danish energy system in 2020 with 50% wind power shows that individual heat pumps and heat storages can contribute to the integration of wind power....... Heat accumulation tanks and passive heat storage in the construction are investigated as two alternative storage options in terms of their ability to increase wind power utilisation and to provide cost-effective fuel savings. Results show that passive heat storage can enable equivalent to larger...... reductions in excess electricity production and fuel consumption than heat accumulation tanks. Moreover, passive heat storage is found to be significantly more cost-effective than heat accumulation tanks. In terms of reducing fuel consumption of the energy system, the installation of heat pumps is the most...

  15. Nuclear power as an option in electrical generation planning for Croatia

    International Nuclear Information System (INIS)

    Feretic, D.; Tomsic, Z.; Cavlina, N.; Kovacevic, T.

    2000-01-01

    The expected increase of electricity consumption in the next two decades, if covered mainly by domestic production, will require roughly 4500 MW of new installed capacity. The question is which resource mix would be optimal for the future power plants. Taking into account lack of domestic resources for electricity generation, current trends in the European energy markets, and environmental impact of various energy technologies, it seems reasonable for Croatia to keep the nuclear option open in the future energy planning. In line with that conclusion, this paper analyzes how the introduction of nuclear power plants would influence future power system expansion plans in Croatia, and the possibility to meet the Kyoto requirement. The effects of CO 2 emission tax and external costs on the optimal capacity mix and the emissions levels are also examined. (author)

  16. Review of scientific and technical options for the Superconducting Super Collider Program

    Energy Technology Data Exchange (ETDEWEB)

    Dombeck, T.

    1993-11-01

    This document is a review of options for the Superconducting Super Collider (SSC) Program. It is the result of an informal study by an ad-hoc working group consisting of Laboratory physicists and engineers who investigated the physics and technical implications of a number of possible alternative SSC programs. Previous studies have shown, and early in this study it was confirmed, that a collider of approximately 20 TeV protons on 20 TeV protons with a luminosity of 10{sup 33} cm{sup {minus}2}s{sup {minus}1} at each interaction region is needed to support a physics program that is guaranteed to answer existing particle physics questions and make new discoveries. Therefore, all options considered in this document were consistent with attainment of these original goals for the SSC. One promising option considered was a program of colliding anti-protons on protons as a possible means to reduce the cost of the SSC by eliminating one of the Collider rings. However, the luminosity requirements to obtain the SSC physics goals remains the same as for protons colliding with protons and this study confirms that even though progress has been made over the last ten years in obtaining the high intensity anti-proton beams necessary, a luminosity higher than 10{sup 32} cannot be guaranteed. Other options were examined to see what advantages could be derived by departing from the SSC baseline program, either in schedule, in parameters, by staging, or by combinations of these options. Even though we considered re-examination of the cost of the baseline program to be beyond the scope of this document, differential cost savings were estimated. Finally, a brief survey of progress over the last ten years in various technical areas that might lead to more cost effective engineering designs was included in this study, such as higher magnetic field magnets resulting from lower operating temperatures or higher current-carrying superconducting materials.

  17. Review of scientific and technical options for the Superconducting Super Collider Program

    International Nuclear Information System (INIS)

    Dombeck, T.

    1993-11-01

    This document is a review of options for the Superconducting Super Collider (SSC) Program. It is the result of an informal study by an ad-hoc working group consisting of Laboratory physicists and engineers who investigated the physics and technical implications of a number of possible alternative SSC programs. Previous studies have shown, and early in this study it was confirmed, that a collider of approximately 20 TeV protons on 20 TeV protons with a luminosity of 10 33 cm -2 s -1 at each interaction region is needed to support a physics program that is guaranteed to answer existing particle physics questions and make new discoveries. Therefore, all options considered in this document were consistent with attainment of these original goals for the SSC. One promising option considered was a program of colliding anti-protons on protons as a possible means to reduce the cost of the SSC by eliminating one of the Collider rings. However, the luminosity requirements to obtain the SSC physics goals remains the same as for protons colliding with protons and this study confirms that even though progress has been made over the last ten years in obtaining the high intensity anti-proton beams necessary, a luminosity higher than 10 32 cannot be guaranteed. Other options were examined to see what advantages could be derived by departing from the SSC baseline program, either in schedule, in parameters, by staging, or by combinations of these options. Even though we considered re-examination of the cost of the baseline program to be beyond the scope of this document, differential cost savings were estimated. Finally, a brief survey of progress over the last ten years in various technical areas that might lead to more cost effective engineering designs was included in this study, such as higher magnetic field magnets resulting from lower operating temperatures or higher current-carrying superconducting materials

  18. A real options-based CCS investment evaluation model: Case study of China's power generation sector

    International Nuclear Information System (INIS)

    Zhu, Lei; Fan, Ying

    2011-01-01

    Highlights: → This paper establishes a carbon captures and storage (CCS) investment evaluation model. → The model is based on real options theory and solved by the Least Squares Monte Carlo (LSM) method. → China is taken as a case study to evaluate the effects of regulations on CCS investment. → The findings show that the current investment risk of CCS is high, climate policy having the greatest impact on CCS development. -- Abstract: This paper establishes a carbon capture and storage (CCS) investment evaluation model based on real options theory considering uncertainties from the existing thermal power generating cost, carbon price, thermal power with CCS generating cost, and investment in CCS technology deployment. The model aims to evaluate the value of the cost saving effect and amount of CO 2 emission reduction through investing in newly-built thermal power with CCS technology to replace existing thermal power in a given period from the perspective of power generation enterprises. The model is solved by the Least Squares Monte Carlo (LSM) method. Since the model could be used as a policy analysis tool, China is taken as a case study to evaluate the effects of regulations on CCS investment through scenario analysis. The findings show that the current investment risk of CCS is high, climate policy having the greatest impact on CCS development. Thus, there is an important trade off for policy makers between reducing greenhouse gas emissions and protecting the interests of power generation enterprises. The research presented would be useful for CCS technology evaluation and related policy-making.

  19. 24 CFR 982.642 - Homeownership option: Pilot program for homeownership assistance for disabled families.

    Science.gov (United States)

    2010-04-01

    ... ASSISTANCE: HOUSING CHOICE VOUCHER PROGRAM Special Housing Types Homeownership Option § 982.642 Homeownership... declared major disaster or emergency. (d) Amount and distribution of homeownership assistance payments. (1... payment on behalf of the family in accordance with § 982.635 and this section. (2) A family that is a low...

  20. Department of Defense high power laser program guidance

    Science.gov (United States)

    Muller, Clifford H.

    1994-06-01

    The DoD investment of nominally $200 million per year is focused on four high power laser (HPL) concepts: Space-Based Laser (SBL), a Ballistic Missile Defense Organization effort that addresses boost-phase intercept for Theater Missile Defense and National Missile Defense; Airborne Laser (ABL), an Air Force effort that addresses boost-phase intercept for Theater Missile Defense; Ground-Based Laser (GBL), an Air Force effort addressing space control; and Anti-Ship Missile Defense (ASMD), a Navy effort addressing ship-based defense. Each organization is also supporting technology development with the goal of achieving less expensive, brighter, and lighter high power laser systems. These activities represent the building blocks of the DoD program to exploit the compelling characteristics of the high power laser. Even though DoD's HPL program are focused and moderately strong, additional emphasis in a few technical areas could help reduce risk in these programs. In addition, a number of options are available for continuing to use the High-Energy Laser System Test Facility (HELSTF) at White Sands Missile Range. This report provides a brief overview and guidance for the five efforts which comprise the DoD HPL program (SBL, ABL, GBL, ASMD, HELSTF).

  1. New power generation technology options under the greenhouse gases mitigation scenario in China

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Qiang [Graduate University of Chinese Academy of Science, 19A Yu Quan Road, Beijing 100049 (China); Energy Research Institute, Guohong Mansion, Xicheng District, Beijing 100038 (China); Shi, Minjun [Graduate University of Chinese Academy of Science, 19A Yu Quan Road, Beijing 100049 (China); Jiang, Kejun [Energy Research Institute, Guohong Mansion, Xicheng District, Beijing 100038 (China)

    2009-06-15

    Climate change has become a global issue. Almost all countries, including China, are now considering adopting policies and measures to reduce greenhouse gas (GHG) emissions. The power generation sector, as a key source of GHG emissions, will also have significant potential for GHG mitigation. One of the key options is to use new energy technologies with higher energy efficiencies and lower carbon emissions. In this article, we use an energy technology model, MESSAGE-China, to analyze the trend of key new power generation technologies and their contributions to GHG mitigation in China. We expect that the traditional renewable technologies, high-efficiency coal power generation and nuclear power will contribute substantially to GHG mitigation in the short term, and that solar power, biomass energy and carbon capture and storage (CCS) will become more important in the middle and long term. In the meantime, in order to fully bring the role of technology progress into play, China needs to enhance the transfer and absorption of international advanced technologies and independently strengthen her ability in research, demonstration and application of new power generation technologies. (author)

  2. New power generation technology options under the greenhouse gases mitigation scenario in China

    Energy Technology Data Exchange (ETDEWEB)

    Qiang, Liu [Graduate University of Chinese Academy of Science, 19A Yu Quan Road, Beijing 100049 (China); Energy Research Institute, Guohong Mansion, Xicheng District, Beijing 100038 (China)], E-mail: liuqiang@eri.org.cn; Minjun, Shi [Graduate University of Chinese Academy of Science, 19A Yu Quan Road, Beijing 100049 (China); Kejun, Jiang [Energy Research Institute, Guohong Mansion, Xicheng District, Beijing 100038 (China)

    2009-06-15

    Climate change has become a global issue. Almost all countries, including China, are now considering adopting policies and measures to reduce greenhouse gas (GHG) emissions. The power generation sector, as a key source of GHG emissions, will also have significant potential for GHG mitigation. One of the key options is to use new energy technologies with higher energy efficiencies and lower carbon emissions. In this article, we use an energy technology model, MESSAGE-China, to analyze the trend of key new power generation technologies and their contributions to GHG mitigation in China. We expect that the traditional renewable technologies, high-efficiency coal power generation and nuclear power will contribute substantially to GHG mitigation in the short term, and that solar power, biomass energy and carbon capture and storage (CCS) will become more important in the middle and long term. In the meantime, in order to fully bring the role of technology progress into play, China needs to enhance the transfer and absorption of international advanced technologies and independently strengthen her ability in research, demonstration and application of new power generation technologies.

  3. Safety-related topics from the Nuclear Power Options Viability Study

    International Nuclear Information System (INIS)

    Trauger, D.B.; White, J.D.

    1986-01-01

    The Nuclear Power Options Viability Study (NPOVS) evaluated innovative reactor concepts, and this article reviews NPOVS findings, with emphasis on safety and licensing. The reactors studied were of light-water, liquid-metal, and helium-cooled concepts, and most were of modular design. Prelicensed standard plants offer an important step toward regulatory stability and early licensing approvals with public participation before major expenditures. Advanced reactors with passive safety features offer the possibility of performance-based regulation. The concepts studied appear to be potentially viable, but more complete designs will be required before economic evaluations can be definitive

  4. Alternative fuel cycle options: performance characteristics and impact on nuclear power growth potential

    International Nuclear Information System (INIS)

    Chang, Y.I.; Till, C.E.; Rudolph, R.R.; Deen, J.R.; King, M.J.

    1977-09-01

    The fuel utilization characteristics for LWR, SSCR, CANDU and LMFBR reactor concepts are quantified for various fuel cycle options, including once-through cycles, thorium cycles, and denatured cycles. The implications of various alternative reactor deployment strategies on the long-term nuclear power growth potential are then quantified in terms of the maximum nuclear capacity that can be achieved and the growth pattern over time, subject to the constraint of a fixed uranium-resource base. The overall objective of this study is to shed light on any large differences in the long-term potential that exist between various alternative reactor/fuel cycle deployment strategies

  5. Strips of hourly power options. Approximate hedging using average-based forward contracts

    International Nuclear Information System (INIS)

    Lindell, Andreas; Raab, Mikael

    2009-01-01

    We study approximate hedging strategies for a contingent claim consisting of a strip of independent hourly power options. The payoff of the contingent claim is a sum of the contributing hourly payoffs. As there is no forward market for specific hours, the fundamental problem is to find a reasonable hedge using exchange-traded forward contracts, e.g. average-based monthly contracts. The main result is a simple dynamic hedging strategy that reduces a significant part of the variance. The idea is to decompose the contingent claim into mathematically tractable components and to use empirical estimations to derive hedging deltas. Two benefits of the method are that the technique easily extends to more complex power derivatives and that only a few parameters need to be estimated. The hedging strategy based on the decomposition technique is compared with dynamic delta hedging strategies based on local minimum variance hedging, using a correlated traded asset. (author)

  6. Mastering C pointers tools for programming power

    CERN Document Server

    Traister, Robert J

    2014-01-01

    If you don't fully understand C pointers and how they are used, you're not getting the most out of C programming. This book features complete coverage on using and controlling C language pointers to make C applications more powerful and expressive. This new edition is completely updated and revised to reflect the changes that have been brought about with the full adoption of ANSI C. All discussions and program examples have been updated, and reading materials necessary for any modern ANSI C programmer have also been added.Includes one 3 1/2"" disk containing all of the working programs and m

  7. 46 CFR 71.50-27 - Alternative Hull Examination (AHE) program options: Divers or underwater remotely operated...

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Alternative Hull Examination (AHE) program options...-27 Alternative Hull Examination (AHE) program options: Divers or underwater remotely operated vehicle... operations; (2) Provide permanent hull markings, a temporary grid system of wires or cables spaced not more...

  8. 41 CFR 102-194.30 - What role does my agency play in the Standard and Optional Forms Management Program?

    Science.gov (United States)

    2010-07-01

    ... What role does my agency play in the Standard and Optional Forms Management Program? Your agency head... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What role does my agency play in the Standard and Optional Forms Management Program? 102-194.30 Section 102-194.30 Public...

  9. Student Loan Programs. As Federal Costs of Loan Consolidation Rise, Other Options Should be Examined. Report to Congressional Requesters.

    Science.gov (United States)

    General Accounting Office, Washington, DC.

    In this report GAO recommends that the Secretary of Education assess the advantages of consolidation loans for borrowers and the government in light of program costs and identify options for reducing federal costs. Options could include targeting the program to borrowers at risk of default and extending existing consolidation alternatives to more…

  10. Is Solar Power The Best Energy Option To Meet Our Future Demands

    Directory of Open Access Journals (Sweden)

    Samyak Shami

    2015-08-01

    Full Text Available Abstract Currently about 65 of global electricity generation now is fossil fuel-based spewing 13 giga tonnes of CO2 . With mass production and innovations in technology the prices of renewable energy sources have plummeted to such levels where have become a welcoming option even without the subsidies.China has installed nearly 100 gigawatts GW of wind power and plans to double it within the next five years while Britain is also in offshore wind power in a big way. However oil continues to be the most valued fuel source as almost all of it is consumed in internal combustion IC engines mostly for transport and some for captive power plants. Biofuels and hydrogen fuel cells may be used as alternatives to petrol but biofuels which include ethanol hamper the performance of a vehicle.The production cost of solar power panels has come down so much that they are competing with the coal-based power even without the subsidy. The solar powered lanterns made up of a few light-emitting diodes are bringing light and enhancing the quality of life in the worlds poorest regions which are also located in the equatorial region. The US Department of Energys target is to produce 27 of Americas electricity using solar power by 2050 up from less than 1 today. In Australia solar power panels most of them on rooftops cater to almost 10 of the demand. About 25 households of South Australia have solar power followed by Queensland 22 and Western Australia 18.Modern innovations in solar cells show enormous capabilities for them to be used extensively on windows buildings even cell phones or any device that has a clear surface. Similar strides have been made in concentrated solar power. The Solar power however has limitations too. It can not generate power during night or when sky is overcast. Excessive power generated by solar panels has led to a crisis in Germany and elsewhere to the extent that generating companies in addition to selling were also paying back the managers

  11. Nuclear Power as an Option in Electrical Generation Planning for Small Economy and Electricity Grid

    International Nuclear Information System (INIS)

    Tomsic, Z.

    2012-01-01

    Implementing a NPP in countries with relatively small total GDP (small economy) and usually with small electricity grid face two major problems and constrains: the ability to obtain the considerable financial resources required on reasonable terms and to connect large NPP to small electricity grid. Nuclear generation financing in developing countries involves complex issues that need to be fully understood and dealt with by all the parties involved. The main topics covered by paper will be the: special circumstances related to the financing of NPP, costs and economic feasibility of NPP, conventional approaches for financing power generation projects in developing countries, alternative approaches for mobilizing financial resources. The safe and economic operation of a nuclear power plant (NPP) requires the plant to be connected to an electrical grid system that has adequate capacity for exporting the power from the NPP, and for providing a reliable electrical supply to the NPP for safe start-up, operation and normal or emergency shut-down of the plant. Connection of any large new power plant to the electrical grid system in a country may require significant modification and strengthening of the grid system, but for NPPs there may be added requirements to the structure of the grid system and the way it is controlled and maintained to ensure adequate reliability. Paper shows the comparative assesment of differrent base load technologies as an option in electrical generation planning for small economy and electricity grid.(author).

  12. Startup program after SGR and power increase

    International Nuclear Information System (INIS)

    Krajnc, B.; Dudas, M.; Spiler, J.; Novsak, M.

    2000-01-01

    NPP Krsko replaced steam generators during the outage 2000. Parallel with the steam generator replacement all required systems modifications to accommodate new steam generators into the existing plant (upper feed,..) and support plant power increase of 6.3%, have been implemented. During the years 1997 - 2000 all the required licensing, technical analyses and systems verifications to support such plant changes have been completed. One of the activities within this effort was also the preparation of a detailed Plant Startup Program, which was subject of licensing review and approval process. An integrated plant startup program was then developed based on the plant startup test program, performed regularly during plant startup after refueling and above-mentioned Plant Startup Program. These additional tests defined by the Startup Test Program have been required due to new steam generators, steam generator replacement and related modifications, and power increase from previous 1882 MWt to 2000 MWt. During the preparation period, a startup team was established and procedures were written. All procedures sensitive to the operation were validated on the plant specific simulator. This paper presents more about the Startup Test Program, analysis of its implementation, the results of some key tests as well as the lessons learned. (author)

  13. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  14. Economic consideration for Indonesia's nuclear power program

    International Nuclear Information System (INIS)

    Ahimsa, D.; Sudarsono, B.

    1987-01-01

    Indonesia experienced relatively high economic growth during the 1970s and the energy supply system was strained to keep up with demand. Several energy studies were thus carried out around 1980, including a nuclear power planning study and a nuclear plant feasibility study. During the 1980s, economic growth rates were subtantially lower, but surprisingly electricity demand remained fairly high. In 1984 it was therefore decided to update previous nuclear power studies. This effort was completed in 1986. Using energy projections and cost estimates developed during the updating of previous nuclear power studies, the paper discusses the economic justification for a nuclear power program in Indonesia. Results of the update, including computer runs of MAED and WASP models supplied by the IAEA, will be presented along with appropriate sensitivity analysis. These results are then analyzed in the light of 1986 developments in international oil price. Preparations for the forthcoming nuclear power program are described, including the construction of a multi-purpose reactor and associated laboratories in Serpong, near Jakarta. (author)

  15. Optimal electricity generation system expansion and nuclear power option in Belarus

    International Nuclear Information System (INIS)

    Yakushau, A.; Mikhalevich, A.

    2000-01-01

    After having declared independence, the Republic of Belarus was forced to import 90% of fuel consumed and 25% of electricity. The deficit of peak electric capacity reached 40%. The imported fuel covers the last years because the drop in the production reduced the energy consumption in the Republic but not the needs of the energy sector. Annual payments for imported fuel and electricity are equal to the sum of an annual state budget of Belarus (about 1.5 billion USD) and current debts were not lower 300 million. Comparative analysis of the different scenarios of the electricity generation system expansion showed that an optimum way for electricity generation is installation of the combine cycle units and construction nuclear power plants. The results of the study also showed that the option based on replacement of deficit of the electricity generation by the way of the construction combine cycle units with capacities 450 MW turned out to be the best solution among non nuclear options. (author)

  16. Renewables-to-reefs? - Decommissioning options for the offshore wind power industry.

    Science.gov (United States)

    Smyth, Katie; Christie, Nikki; Burdon, Daryl; Atkins, Jonathan P; Barnes, Richard; Elliott, Michael

    2015-01-15

    The offshore wind power industry is relatively new but increasing globally, hence it is important that the whole life-cycle is managed. The construction-operation-decommissioning cycle is likely to take 20-30 years and whilst decommissioning may not be undertaken for many years, its management needs to be addressed in both current and future marine management regimes. This can be defined within a Drivers-Activities-Pressures-State Changes-Impacts (on human Welfare)-Responses framework. This paper considers the main decommissioning options - partial or complete removal of all components. A SWOT analysis shows environmental and economic benefits in partial as opposed to complete removal, especially if habitat created on the structures has conservation or commercial value. Benefits (and repercussions) are defined in terms of losses and gains of ecosystem services and societal benefits. The legal precedents and repercussions of both options are considered in terms of the 10-tenets of sustainable marine management. Finally a 'renewables-to-reefs' programme is proposed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Excel 2013 power programming with VBA

    CERN Document Server

    Walkenbach, John

    2013-01-01

    Maximize your Excel 2013 experience using VBA application development The new Excel 2013 boasts updated features, enhanced power, and new capabilities. Naturally, that means John Walkenbach returns with a new edition of his bestselling VBA Programming book and covers all the methods and tools you need to know in order to program with Excel. With this comprehensive guide, ""Mr. Spreadsheet"" shows you how to maximize your Excel experience using professional spreadsheet application development tips from his own personal bookshelf. Featuring a complete introduction to Visual Basic f

  18. Training within the French nuclear power program

    International Nuclear Information System (INIS)

    Jusselin, F.

    1987-01-01

    Training dispensed by the EDF Nuclear and Fossil Generation Division has contributed significantly toward successful startup and operation of French nuclear power plants. In 1986, the time-based availability of 900 MW PWRs totaled 85 %. This is just one example of how EDF training programs have benefited from 150 reactor-years of operating experience and the ensuing opportunities for perfecting and testing of training tool effectiveness. These programs have been adopted by utilities in other countries where suitable local facilities are making advantageous use of EDF training experience and methods. EDF expertise is also transferred to these countries indirectly through the simulator manufacturer

  19. Analysis of an option to finance the investment in a nuclear power plant

    International Nuclear Information System (INIS)

    Villanueva M, C.

    2011-11-01

    According to the recent projection of costs of electric generation published by the International Atomic Energy Agency, with a rate of discount of 10% annual the even unitary cost of a nuclear power station of 1,400 MW of capacity would be 98. 75 USD 2010 /MWh, while for a combined cycle of same capacity that burns natural gas the cost it would be 92. 11 USD 2010 /MWh, operating the power stations with a capacity factor of 85% to generate 10,424 annual G Wh. To 5% annual, the costs would decrease at 58. 53 USD 2010 /MWh for the nuclear energy and at 85. 77 USD 2010 /MWh for the combined cycle. In an indifference analysis of the price of natural gas against the investment cost in the nuclear, with a rate of discount of 10% annual the common cost would be 97. 31 USD 2010 /MWh, when the even price of the natural gas was 10. 50 USD 2010 /G J and simultaneously the unitary cost of investment of the nuclear was 4,023 USD 2010 /kw. Under similar conditions, if the investment in the nuclear power station was 4,163 USD 2010 /Kw to redeem it in 60 years of economic useful life the equivalent annuity would be of USD 2010 790.060 millions that would have the same value of the annual invoice of the natural gas consumed by the combined cycle power station to the price of 12. 00 USD 2010 /G J. Then, as example of an excellent option of the Federal Commission of Electricity to finance with own resources budget them a new nuclear power station, the investment could redeem annually with the savings that it would represent to stop to burn natural gas when displacing the equivalent generation in central of combined cycle. (Author)

  20. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  1. A parametric approach for the valuation of power plant flexibility options

    Directory of Open Access Journals (Sweden)

    Julia Hentschel

    2016-11-01

    Full Text Available Conventional generation units encounter a changing role in modern societies’ energy supply. With increased need for flexible operation, engineers and project managers have to evaluate the benefits of technical improvements. For this purpose, a valuation tool has been developed, comparing economical cornerstones and technical constraints of generation units to European Energy Exchange prices for PHELIX 2014. It enables the user to relate a change in technical parameters to an economic effect and possible revenues. Four different types of conventional power plants are investigated in scenarios with increasing CO2 and fuel prices to determine the impact of different flexibility options. Results show that an increased ramp rate has not the same magnitude of positive economic impact as reduced minimum operation load, based on an observation on a price signal with resolution of fifteen minutes.

  2. Suggestions for an updated fusion power program

    International Nuclear Information System (INIS)

    Clarke, J.F.

    1976-02-01

    This document contains suggestions for a revised CTR Program strategy which should allow us to achieve equivalent goals while operating within the above constraints. The revised program is designed around three major facilities. The first is an upgrading of the present TFTR facility which will provide a demonstration of the generation of tens of megawatts electric equivalent originally envisioned for the 1985 EPR. The second device is the TTAP which will allow the integration and optimization of the plasma physics results obtained from the next generation of plasma physics experiments. The improvement in tokamak reactor operation resulting from this optimization of fusion plasma performance will enable an EPR to be designed which will produce several hundred megawatts of electric power by 1990. This will move the fusion program much closer to its goal of commercial fusion power by the turn of the century. In addition to this function the TTAP will serve as a prototype of the 1990 EPR system, thus making more certain the successful operation of this device. The third element of this revised program is an intense radiation damage facility which will provide the radiation damage information necessary for the EPR and subsequent fusion reactor facilities. The sum total of experience gained from reacting plasma experiments on TFTR, reactor grade plasma optimization and technological prototyping on TTAP, and end of life radiation damage results from the intense neutron facility will solve all of the presently foreseen problems associated with a tokamak fusion power reactor except those associated with the external nuclear systems. These external system problems such as tritium breeding and optimal power recovery can be developed in parallel on the 1990 EPR

  3. 76 FR 66284 - Wind and Water Power Program

    Science.gov (United States)

    2011-10-26

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Wind and Water Power Program... projects. The 2011 Wind and Water Power Program, Water Power Peer Review Meeting will review the Program's... 2011 Water Power Peer Review Meeting will be held November 1 through November 3, 2011 in Alexandria, VA...

  4. Wilberforce Power Technology in Education Program

    Science.gov (United States)

    Gordon, Edward M.; Buffinger, D. R.; Hehemann, D. G.; Breen, M. L.; Raffaelle, R. P.

    1999-01-01

    The Wilberforce Power Technology in Education Program is a multipart program. Three key parts of this program will be described. They are: (1) WISE-The Wilberforce Summer Intensive Experience. This annual offering is an educational program which is designed to provide both background reinforcement and a focus on study skills to give the participants a boost in their academic performance throughout their academic careers. It is offered to entering Wilberforce students. Those students who take advantage of WISE learn to improve important skills which enable them to work at higher levels in mathematics, science and engineering courses throughout their college careers, but most notably in the first year of college study. (2) Apply technology to reaming. This is being done in several ways including creating an electronic chemistry text with hypertext links to a glossary to help the students deal with the large new vocabulary required to describe and understand chemistry. It is also being done by converting lecture materials for the Biochemistry class to PowerPoint format. Technology is also being applied to learning by exploring simulation software of scientific instrumentation. (3) Wilberforce participation in collaborative research with NASA's John H. Glenn Research Center at Lewis Field. This research has focused on two areas in the past year. The first of these is the deposition of solar cell materials. A second area involves the development of polymeric materials for incorporation into thin film batteries.

  5. Nuclear Power Reactor simulator - based training program

    International Nuclear Information System (INIS)

    Abdelwahab, S.A.S.

    2009-01-01

    nuclear power stations will continue playing a major role as an energy source for electric generation and heat production in the world. in this paper, a nuclear power reactor simulator- based training program will be presented . this program is designed to aid in training of the reactor operators about the principles of operation of the plant. also it could help the researchers and the designers to analyze and to estimate the performance of the nuclear reactors and facilitate further studies for selection of the proper controller and its optimization process as it is difficult and time consuming to do all experiments in the real nuclear environment.this program is written in MATLAB code as MATLAB software provides sophisticated tools comparable to those in other software such as visual basic for the creation of graphical user interface (GUI). moreover MATLAB is available for all major operating systems. the used SIMULINK reactor model for the nuclear reactor can be used to model different types by adopting appropriate parameters. the model of each component of the reactor is based on physical laws rather than the use of look up tables or curve fitting.this simulation based training program will improve acquisition and retention knowledge also trainee will learn faster and will have better attitude

  6. Nuclear and intermittent renewables: Two compatible supply options? The case of the French power mix

    International Nuclear Information System (INIS)

    Cany, Camille; Mansilla, Christine; Costa, Pascal da; Mathonnière, Gilles; Duquesnoy, Thierry; Baschwitz, Anne

    2016-01-01

    The complementary features of low-carbon power sources are a central issue in designing energy transition policies. The French current electricity mix is characterised by a high share of nuclear power which equalled 76% of the total electric production in 2015. With the increase in intermittent renewable sources, nuclear flexibility is examined as part of the solution to balance electricity supply and demand. Our proposed methodology involves designing scenarios with nuclear and intermittent renewable penetration levels, and developing residual load duration curves in each case. The load modulation impact on the nuclear production cost is estimated. This article shows to which extent the nuclear annual energy production will decrease with high shares of intermittent renewables (down to load factors of 40% for proactive assumptions). However, the production cost increase could be compensated by progressively replacing the plants. Moreover, incentives are necessary if nuclear is to compete with combined-cycle gas turbines as its alternative back-up option. In order to reconcile the social planner with plant operator goals, the solution could be to find new outlets rather than reducing nuclear load factors. Nuclear flexibility could then be considered in terms of using its power to produce heat or hydrogen. - Highlights: •Nuclear flexibility is examined to balance the system with high renewables share. •Impacts of wind and solar shares on the nuclear load factor and LCOE are assessed. •Nuclear fleet replacement must be progressive to ensure competitive load-following. •Incentives are needed for nuclear to compete with CCGT gas back-up. •We recommend considering nuclear flexibility through the power use.

  7. Concrete Technology program for nuclear power plants

    International Nuclear Information System (INIS)

    Hassazadeh, M.; Wrangensten, L.

    2009-01-01

    The nuclear power plants in Sweden and Finland were built during the seventies/eighties and it is planned to extend their service life and increase their production capacity. The challenges are now to assess the condition of the concrete structures; to verify whether or not the structures can withstand the prescribed loads and functions; and verify if the structures can be upgraded in order to fulfil the requirements regarding load bearing and functional capacity. A research program was launched whose priority is condition assessment of the reactor containment. The research includes condition of the pre-stressing reinforcement, reinforcement bars, lining, leakage etc. The conditions are assessed both by destructive and non-destructive test methods. The addressed properties are physical, mechanical, electro-chemical and geometrical. The paper presents the organisation of the program, the co-operating partners, the research program, and the content of the on-going and planned research projects

  8. Human resources in nuclear power program

    International Nuclear Information System (INIS)

    Machi, Sueo

    2008-01-01

    Nuclear power utilization within 2020 horizon is expanding in Asia, particularly in Japan, China, India, Republic of Korea, Vietnam and Indonesia. The nuclear energy policy iof Japan sees the increase of nuclear power contribution for energy security and to control CO 2 emission with the contribution ratio through the 21 st century kept at the current level of 30-40% or even higher. Japan expects its first reprocessing plant to be operational in 2007 and its first commercial fast breeder reactor operational in 2050. Starting with her experience with the operation of its first research reactor in 1957, a power demonstration reactor from USA in 1963; the first commercial 166 MW power plant from UK in 1966 and then its first commercial 375 MW light water reactor from USA in 1970, Japan developed her own nuclear reactor technology. Today, Japan has 55 operating nuclear power plants (NPPs) totaling 49 GW which supply 30% of its electricity needs. There are two NPPs under construction and 11 additional NPPs to be completed by 2017. Japan's experience showed that engineers in the nuclear, mechanical, electrical, material and chemical fields are needed to man their nuclear power plant. For the period 1958 to about 1970, there was a rapid increase in the number of students enrolled for their bachelor of science majoring in nuclear science and technology but this number of enrollees leveled off beyond 1970 up to 2002. For those pursuing their masters of science degree in this field, there was a steady but moderate rise in the number of students from 1958 to 2002. The population of students in the Ph.D program in nuclear science and technology had the lowest number of enrollees and lowest level of increase from 1958 to 2002. The courses offered at the university for nuclear power are nuclear reactor physics and engineering, nuclear reactor safety engineering and radiation safety. Prior to graduation, the students undergo training at a nuclear research institute, nuclear power

  9. College and university programs for meeting the needs of educating nuclear power plant personnel

    International Nuclear Information System (INIS)

    Hajek, B.K.; Miller, D.W.; De Vuono, A.C.

    1981-01-01

    ANS, INPO, and NRC are considering various recommendations for university courses to be required for all nuclear power plant licensed personnel. This paper discusses these recommendations and compares them with the content and constraints of traditional university academic programs. One solution being pursued by utilities in Ohio is discussed. In this program, courses are being obtained from several different educational institutions for presentation at the power plant site. The program provides sufficient flexibility so that decisions on specific degree options do not have to be made at this time

  10. Long-term issues associated with spent nuclear power fuel management options

    International Nuclear Information System (INIS)

    Jae-Sol, Lee; Kosaku, Fukuda; Burcl, R.; Bell, M.

    2003-01-01

    Spent fuel management is perceived as one of the crucial issues to be resolved for sustainable utilisation of nuclear power. In the last decades, spent fuel management policies have shown diverging tendencies among the nuclear power production countries - a group has adhered to reprocessing- recycle and another has turned to direct disposal, while the rest of the countries have not taken decision yet, often with ''wait and see'' position. Both the closed and open fuel cycle options for spent fuel management have been subject to a number of debates with pros and cons on various issues such as proliferation risk, environmental impact, etc. The anticipation for better technical solutions that would mitigate those issues has given rise to the renewal of interest in partitioning and transmutation of harmful nuclides to be disposed of, and in a broader context, the recent initiatives for development of innovative nuclear systems. The current trend toward globalization of market economy, which has already brought important impacts on nuclear industry, might have a stimulating effect on regional-international co-operations for cost-effective efforts to mitigate some of those long-term issues associated with spent fuel management. (author)

  11. Flexibility valuation in the Brazilian power system: A real options approach

    International Nuclear Information System (INIS)

    Marreco, Juliana de Moraes; Carpio, Lucio Guido Tapia

    2006-01-01

    This paper presents a valuation study of operational flexibility in the complex Brazilian Power System. Thermopower plants represent operational flexibility for the national system operator provided they can be dispatched in dry periods to supply part of the load when reservoir waters are too low. Deficit costs can be avoided as a result. We have adopted a real options approach to calculate the fair value of a financial subsidy to be paid to thermal generators for their availability to the system. A financial subsidy is mandatory for their economic feasibility and, therefore, for increased thermopower capacity in the Brazilian Power System. This is why this policy is currently being studied by Brazil's federal government. In order to illustrate our modeling we have run the model for the southeast subsystem. We found a flexibility value of US$4.52 billion, which represents US$497/MW per year. This means that a 100 MW thermopower plant should receive US$49,700 for each year of its economic lifetime as a fair premium incentive to investments

  12. A new option for exploitage of future nuclear energy. Accelerator driven radioactive clean nuclear power system

    International Nuclear Information System (INIS)

    Ding Dazhao

    2000-01-01

    Nuclear energy is an effective, clean and safe energy resource. But some shortages of the nuclear energy system presently commercial available obstruct further development of the nuclear energy by heavy nuclear fission. Those are final disposal of the high level radioactive waste, inefficient use of the uranium resource and safety issue of the system. Innovative technical option is seeking for by the nuclear scientific community in recent ten years in aiming to overcome these obstacles, namely, accelerator driven sub-critical system (ADS). This hybrid system may bridge over the gap between presently commercial available nuclear power system and the full exploitation of the fusion energy. The basic principle of ADS is described and its capability in waste transmutation, conversion of the nuclear fuel are demonstrated by two examples--AD-fast reactor and AD-heavy water thermal reactor. The feasibility of ADS and some projects in US, Japan, etc are briefly discussed. The rationale in promoting the R and D of ADS in China is emphasized as China is at the beginning stage of its ambitious project in construction of the nuclear power

  13. Use of real options in nuclear power plant valuation in the presence of uncertainty with CO2 emission credit

    International Nuclear Information System (INIS)

    Kiriyama, Eriko; Suzuki, Atsuyuki

    2004-01-01

    The purpose of this study is to analyze the value of an investment in power generation assets that do not emit CO 2 , by using a real option model. This study evaluates the effects of future uncertainty on investment decision-making, by focusing on the uncertainty of CO 2 emission credits [yen/t-CO 2 ] in the fairly near future in Japan. Electric utilities are required to keep plans to prepare for various future uncertainties such as the price of CO 2 emission credits. The real option approach can evaluate the option value of decision-making under uncertainty. This study examined the option value of a power plant [yen/KW] to evaluate the effects of an externality under uncertainty. The results showed that nuclear power would have the most value under the forthcoming CO 2 emission limitations. In order to secure the effectiveness of measures against global warming, we should reconsider the roles of nuclear power plants in Japan. Finally, the real option model is shown to be an effective candidate for a decision-making support tool to deal with problems in energy environmental policy. (author)

  14. Nuclear Power Remains Important Energy Option for Many Countries, IAEA Ministerial Conference Concludes

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: Nuclear power remains an important option for many countries to improve energy security, provide energy for development and fight climate change, the International Ministerial Conference on Nuclear Power in the 21st Century concluded today. Participants also emphasised the importance of nuclear safety in the future growth of nuclear power, noting that nuclear safety has been strengthened worldwide following the March 2011 accident at TEPCO's Fukushima Daiichi Nuclear Power Station. The Conference was organised by the International Atomic Energy Agency (IAEA) in cooperation with the Nuclear Energy Agency (NEA) of the Organisation for Economic Co-operation and Development (OECD), and hosted by the Government of the Russian Federation through the State Atomic Energy Corporation ROSATOM. Sergei Kirienko, Director General of the State Atomic Energy Corporation ROSATOM, said: ''The Conference has achieved its main goal: to confirm that nuclear energy is an important part of the world's energy-mix. The innovative character of this type of energy provides us with sustainable development in the future. The closed nuclear fuel cycle and fusion may open for humanity absolutely new horizons. The Conference underlined the leading role of the IAEA in promoting the peaceful use of nuclear power and provision of the non-proliferation regime. Russia as a co-founder of the IAEA will always support its efforts to develop and expand safety and security standards all over the world.'' ''I believe we can look ahead with confidence and optimism to the future of nuclear power in the 21st century,'' said IAEA Director General Yukiya Amano. After the accident at the Fukushima Daiichi Nuclear Power Plant in Japan in March 2011, ''effective steps have been taken to make nuclear power plants safer everywhere,'' he stressed. ''Nuclear power will make a significant and growing contribution to sustainable development in the coming decades. The IAEA is committed to ensuring that the

  15. Romanian nuclear power program - status and trends

    International Nuclear Information System (INIS)

    Chirica, T.; Condu, M.; Bilegan, I.C.; Glodeanu, F.; Popescu, D.

    1997-01-01

    The paper presents the status and the forecast for the Romanian Nuclear Power Program, as a component of the national strategy of power sector in Romania. The successful commissioning and operation of Cernavoda NPP - Unit 1 consolidated the opinion to go further for completion of Unit 2 to 5 on Cernavoda site. The focus is now on Unit 2, planned to be commissioned in 2001, and on the related projects for radioactive waste treatment and disposal. The Romanian national infrastructure supporting this program is also presented, including the research and development facilities. Romanian nuclear industry represents today one of the most advanced sector in engineering and technology and has the ability to meet the requirements of international codes and standards, proving also excellent quality assurance skills. Romanian nuclear industry has also the capability to compete on third market, for nuclear projects, together with the traditional suppliers. The conclusion of the paper is that for Romania, the nuclear energy is the best solution for future development of power sector, is safe, economic, and ethical. Nuclear sector created in Romania new jobs and activities contributing to the progress of Romanian society. (authors)

  16. Romanian nuclear power program - status and trends

    International Nuclear Information System (INIS)

    Chirica, T.; Condu, M.; Stiopol, M.; Bilegan, I. C.; Glodeanu, F.; Popescu, D.

    1997-01-01

    This paper presents the status and the forecast for the Romanian Nuclear Power Program, as a component of the national strategy of power sector in Romania. The successful commissioning and operation of Cernavoda NPP - Unit 1 consolidated the opinion to go further for completion of Unit 2 to 5 on Cernavoda site. The focus is now on Unit 2, planed to be commissioned in 2001, and on the related projects for radioactive waste treatment and disposal. The Romanian national infrastructure supporting this program is also presented, including the research and development facilities. Romanian nuclear industry represent today one of the most advanced sector in engineering and technology and has the ability to meet the requirements of international codes and standards, proving also excellent quality assurance skills. Romanian nuclear industry has also the capability to compete on third markets, for nuclear projects, together with the traditional suppliers. The conclusion of the paper is that for Romania the nuclear energy is the best solution for future development of power sector, is safe, economic and ethical. Nuclear sector created in Romania new jobs and activities, contributing to the progress of Romanian society. (author). 5 refs

  17. Duke Power Company's control rod wear program

    International Nuclear Information System (INIS)

    Culp, D.C.; Kitlan, M.S. Jr.

    1990-01-01

    Recent examinations performed at several foreign and domestic pressurized water reactors have identified significant control rod cladding wear, leading to the conclusion that previously believed control rod lifetimes are not attainable. To monitor control rod performance and reduce safety concerns associated with wear, Duke Power Company has developed a comprehensive control rod wear program for Ag-In-Cd and boron carbide (B 4 C) rods at the McGuire and Catawba nuclear stations. Duke Power currently uses the Westinghouse 17 x 17 Ag-In-Cd control rod design at McGuire Unit 1 and the Westinghouse 17 x 17 hybrid B 4 C control rod design with a Ag-In-Cd tip at McGuire Unit 2 and Catawba Units 1 and 2. The designs are similar, with the exception of the absorber material and clad thickness. There are 53 control rods per unit

  18. Integrated Portfolio Analysis: Return on Investment and Real Options Analysis of Intelligence Information Systems (Cryptologic Carry On Program)

    National Research Council Canada - National Science Library

    Rios, Jr., Cesar G; Housel, Thomas; Mun, Johnathan

    2006-01-01

    ...) on individual projects, programs, and processes within a portfolio of IT investments. Using KVA historical data as a platform, the authors evaluate potential strategic investments with real options analysis...

  19. Internal Dosimetry for Nuclear Power Program

    International Nuclear Information System (INIS)

    Wo, Y.M.

    2011-01-01

    Internal dosimetry which refers to dosage estimation from internal part of an individual body is an important and compulsory component in order to ensure the safety of the personnel involved in operational of a Nuclear Power Program. Radionuclides particle may deposit in the human being through several pathways and release wave and/or particle radiation to irradiate that person and give dose to body until it been excreted or completely decayed from the body. Type of radionuclides of concerning, monitoring program, equipment's and technique used to measure the concentration level of such radionuclides and dose calculation will be discussed in this article along with the role and capability of Malaysian Nuclear Agency. (author)

  20. Summary of Research on Online and Blended Learning Programs That Offer Differentiated Learning Options. REL 2017-228

    Science.gov (United States)

    Brodersen, R. Marc; Melluzzo, Daniel

    2017-01-01

    This report summarizes the methodology, measures, and findings of research on the influence on student achievement outcomes of K-12 online and blended face-to-face and online learning programs that offer differentiated learning options. The report also describes the characteristics of the learning programs. Most of the examined programs used…

  1. 77 FR 38277 - Wind and Water Power Program

    Science.gov (United States)

    2012-06-27

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Wind and Water Power Program... public meeting. SUMMARY: The Department of Energy (DOE) Wind and Water Power Program is planning a... in Washington, DC on June 13, 2012. Mark Higgins, Wind and Water Power Acting Program Manager, Office...

  2. Options for Management of Spent Fuel and Radioactive Waste for Countries Developing New Nuclear Power Programmes

    International Nuclear Information System (INIS)

    2013-01-01

    start a nuclear power programme. The IAEA has published guidance on particular elements of radioactive waste and spent fuel management, such as establishing nuclear technical and regulatory infrastructure, relevant financing schemes, national policy and strategies, multinational approaches and other aspects linked to building nuclear power plants. The present publication is intended to provide a concise summary of key issues related to the development of a sound radioactive waste and spent nuclear fuel management system. It is designed to brief countries with small or newly established nuclear power programmes about the challenges of, and to describe current and potential alternatives for, managing spent fuel and radioactive waste arising during operation and decommissioning of nuclear power plants. The publication deals primarily with current technical options, but also considers possible future developments and discusses relevant legal, political, technical and safety issues. It identifies the role of, and potential actions to be adopted by, the international community, including the IAEA, in order to support the responsible introduction of nuclear power in interested countries

  3. 77 FR 31839 - Wind and Water Power Program

    Science.gov (United States)

    2012-05-30

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Wind and Water Power Program... projects. The 2012 Wind and Water Power Program, Wind Power Peer Review Meeting will review wind technology... portfolio. The 2012 Wind Power Peer Review Meeting will be held June 19 through June 21, 2012, in Alexandria...

  4. Low-cost storage options for solar hydrogen systems for remote area power supply

    International Nuclear Information System (INIS)

    Suhaib Muhammad Ali; John Andrews

    2006-01-01

    Equipment for storing hydrogen gas under pressure typically accounts for a significant proportion of the total capital cost of solar-hydrogen systems for remote area power supply (RAPS). RAPS remain a potential early market for renewable energy - hydrogen systems because of the relatively high costs of conventional energy sources in remote regions. In the present paper the storage requirements of PV-based solar-hydrogen RAPS systems employing PEM electrolysers and fuel cells to meet a range of typical remote area daily and annual demand profiles are investigated using a spread sheet-based simulation model. It is found that as the costs of storage are lowered the requirement for longer-term storage from summer to winter is increased with consequent potential gains in the overall economics of the solar-hydrogen system. In many remote applications, there is ample space for hydrogen storages with relatively large volumes. Hence it may be most cost-effective to store hydrogen at low to medium pressures achievable by using PEM electrolysers directly to generate the hydrogen at the pressures required, without a requirement for separate electrically-driven compressors. The latter add to system costs while requiring significant parasitic electricity consumption. Experimental investigations into a number of low-cost storage options including plastic tanks and low-to-medium pressure metal and composite cylinders are reported. On the basis of these findings, the economics of solar-hydrogen RAPS systems employing large-volume low-cost storage are investigated. (authors)

  5. Feasibility analysis in the expansion proposal of the nuclear power plant Laguna Verde: application of real options, binomial model

    International Nuclear Information System (INIS)

    Hernandez I, S.; Ortiz C, E.; Chavez M, C.

    2011-11-01

    At the present time, is an unquestionable fact that the nuclear electrical energy is a topic of vital importance, no more because eliminates the dependence of the hydrocarbons and is friendly with the environment, but because is also a sure and reliable energy source, and represents a viable alternative before the claims in the growing demand of electricity in Mexico. Before this panorama, was intended several scenarios to elevate the capacity of electric generation of nuclear origin with a variable participation. One of the contemplated scenarios is represented by the expansion project of the nuclear power plant Laguna Verde through the addition of a third reactor that serves as detonator of an integral program that proposes the installation of more nuclear reactors in the country. Before this possible scenario, the Federal Commission of Electricity like responsible organism of supplying energy to the population should have tools that offer it the flexibility to be adapted to the possible changes that will be presented along the project and also gives a value to the risk to future. The methodology denominated Real Options, Binomial model was proposed as an evaluation tool that allows to quantify the value of the expansion proposal, demonstrating the feasibility of the project through a periodic visualization of their evolution, all with the objective of supplying a financial analysis that serves as base and justification before the evident apogee of the nuclear energy that will be presented in future years. (Author)

  6. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  7. 'Nuclearelectrica' Company messages for a broadly acceptable nuclear power program

    International Nuclear Information System (INIS)

    Stiopol, Mihaela; Bilegan, C. Iosif

    2001-01-01

    Romania started the nuclear power program about 20 years ago, by a high level Government decision. After 1989 the former Ministry of Electrical Power was transformed into a state owned company, RENEL, in which nuclear activities were also included. RENEL was a monopoly system responsible for production, transport and distribution of electricity in Romania. The deregulation process in the power sector was many times asked by the World Bank and International Monetary Fund, to split this monopoly system in separately activities: Production, Transport and Distribution. The first step occurred in July 1998, when the nuclear activities were externalized from RENEL. In nuclear sector two new entities were created: SN 'Nuclearelectrica' SA, a state own company that includes three branches: - Nuclear Power Production - Cernavoda NPP Unit 1; - Nuclear Fuel Plant-Pitesti; - Project Development Branch - Cernavoda Units 2-5. The second entity is the so-called Romanian Authority (Autonomous Reggie) for Nuclear Activities (RAAN), including as branches the heavy water fabrication plant 'ROMAG PROD', the Nuclear Research Institute (ICN) Pitesti and the Nuclear Engineering and Design Institute (CITON) Bucharest. The rest of conventional power sector was renamed, namely, CONEL. The organization process continued and in August 2000, by a Government Ordinance the CONEL was split into the following companies: - one for hydropower production 'HIDROELECTRICA'; - one for thermal power production 'TERMOELECTRICA'; - one for transport 'TRANSELECTRICA'; - one for distribution 'ELECTRICA'. The goal of a third step of restructuring process is the privatization in the power field. The steps of Romanian Power Sector Restructuring are presented. Since 1991 a Public Information program has been established. Depending on the evolution of the construction of the first Romanian nuclear power station, during the years, the messages changed. Everybody working in the nuclear field knows how difficult is

  8. Developing solar power programs : San Francisco's experience

    International Nuclear Information System (INIS)

    Schwartz, F.

    2006-01-01

    This keynote address discussed an array of solar programs initiated in government-owned buildings in San Francisco. The programs were strongly supported by the city's mayor,and the voting public. Known for its fog and varying microclimates, 11 monitoring stations were set up throughout the city to determine viable locations for the successful application of solar technologies. It was observed that 90 per cent of the available sunshine occurred in the central valley, whereas fog along the Pacific shore was problematic. Seven of the monitoring sites showed excellent results. Relationships with various city departments were described, as well as details of study loads, load profiles, electrical systems, roofs and the structural capabilities of the selected government buildings. There was a focus on developing good relations with the local utility. The Moscone Convention Center was selected for the program's flagship installation, a 675 kW solar project which eventually won the US EPA Green Power Award for 2004 and received high press coverage. Cost of the project was $4.2 million. 825,000 kWh solar electricity was generated, along with 4,500,000 kWh electricity saved annually from efficiency measures, resulting in a net reduction of 5,325,000 kWh. Savings on utilities bills for the center were an estimated $1,078,000. A pipeline of solar projects followed, with installations at a sewage treatment plant and a large recycling depot. A program of smaller sites included libraries, schools and health facilities. Details of plans to apply solar technology to a 500 acre redevelopment site in southeast San Francisco with an aging and inadequate electrical infrastructure were described. A model of efficient solar housing for the development was presented, with details of insulation, windows, heating ventilation and air-conditioning (HVAC), water heating, lighting, appliances and a 1.2 kilowatt solar system. Peak demand reductions were also presented. tabs., figs

  9. Electromagnetic pulse research on electric power systems: Program summary and recommendations. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Barnes, P.R.; McConnell, B.W.; Van Dyke, J.W. [Oak Ridge National Lab., TN (United States); Tesche, F.M. [Tesche (F.M.), Dallas, TX (United States); Vance, E.F. [Vance (E.F.), Fort Worth, TX (United States)

    1993-01-01

    A single nuclear detonation several hundred kilometers above the central United States will subject much of the nation to a high-altitude electromagnetic pulse (BENT). This pulse consists of an intense steep-front, short-duration transient electromagnetic field, followed by a geomagnetic disturbance with tens of seconds duration. This latter environment is referred to as the magnetohydrodynamic electromagnetic pulse (NMENT). Both the early-time transient and the geomagnetic disturbance could impact the operation of the nation`s power systems. Since 1983, the US Department of Energy has been actively pursuing a research program to assess the potential impacts of one or more BENT events on the nation`s electric energy supply. This report summarizes the results of that program and provides recommendations for enhancing power system reliability under HENT conditions. A nominal HENP environment suitable for assessing geographically large systems was developed during the program and is briefly described in this report. This environment was used to provide a realistic indication of BEMP impacts on electric power systems. It was found that a single high-altitude burst, which could significantly disturb the geomagnetic field, may cause the interconnected power network to break up into utility islands with massive power failures in some areas. However, permanent damage would be isolated, and restoration should be possible within a few hours. Multiple bursts would likely increase the blackout areas, component failures, and restoration time. However, a long-term blackout of many months is unlikely because major power system components, such as transformers, are not likely to be damaged by the nominal HEND environment. Moreover, power system reliability, under both HENT and normal operating conditions, can be enhanced by simple, and often low cost, modifications to current utility practices.

  10. Green power programs in Canada : 2002 : Overview of Government green power policies, utility green power development programs, green power and certificate marketing initiatives, and their benefits

    International Nuclear Information System (INIS)

    Bramley, M.; Boustie, S.; Vadgama, J.; Wieler, C.; Pape-Salmon, A.; Holmes, R.

    2003-11-01

    Green power is generally defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. Green power offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities associated with these four categories in 2002 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities in the report, such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Each category was presented in detail. The information included in the report was based on surveys sent to each program proponent. Follow-up communications and other publicly available information was also included. New programs operating in 2003 or currently under development were listed. refs., 8 tabs

  11. Role of male partner involvement in ART retention and adherence in Malawi's Option B+ program.

    Science.gov (United States)

    Wesevich, Austin; Mtande, Tiwonge; Saidi, Friday; Cromwell, Elizabeth; Tweya, Hannock; Hosseinipour, Mina C; Hoffman, Irving; Miller, William C; Rosenberg, Nora E

    2017-11-01

    Malawi's Option B+ program provides all HIV-infected pregnant women free lifelong antiretroviral therapy (ART), but challenges remain regarding retention and ART adherence, potentially due to male partner barriers. We explored relationships between male partner involvement and Option B+ retention and adherence. In 2014, a randomized controlled trial in Malawi compared male recruitment strategies for couple HIV testing and counseling (cHTC) at an antenatal clinic. This secondary analysis was conducted among the entire cohort (N = 200) of women, irrespective of randomization status. We assessed whether cHTC attendance, early disclosure of HIV-positive status, and partner ART reminders were associated with retention and adherence at one month after starting treatment. Retention was defined as attending HIV clinic follow-up within one day of running out of pills. Adherence was defined as taking ≥95% of ARTs by pill count. We used binomial regression to calculate adjusted risk ratios (aRR) and 95% confidence intervals (CI). Median female age was 26 years. Most women (79%) were retained; of these, 68% were adherent. Receiving cHTC was associated with improved retention (aRR 1.33, 95% CI 1.12, 1.59). Receiving male partner ART reminders was weakly associated with retention (aRR 1.16, 95% CI 0.96, 1.39). Disclosure within one day was not associated with retention (aRR 1.08, 95% CI: 0.91, 1.28). Among those who were retained, these three behaviors were not associated with improved 95% adherence. CHTC could play an important role in improving Option B+ retention. Increasing cHTC participation and enhancing adherence-related messages within cHTC are important.

  12. Newborn screening for congenital cytomegalovirus: Options for hospital-based and public health programs.

    Science.gov (United States)

    Grosse, Scott D; Dollard, Sheila; Ross, Danielle S; Cannon, Michael

    2009-12-01

    Congenital cytomegalovirus (CMV) infection is a leading cause of sensorineural hearing loss (SNHL) and developmental disability in children. Early identification of infected children through screening could allow for early intervention and improvement in functional outcomes among the subset who develop sequelae. To outline potential options and strategies for screening newborns for congenital CMV infection and to discuss barriers to screening and data needs to inform future policy decisions. Commentary based on the literature and expert opinion on newborn dried blood spot screening, newborn hearing screening/Early Hearing Detection and Intervention (EHDI) programs, and congenital CMV. Although no population-based screening for congenital CMV is underway, pilot newborn screening studies using a variety of assays with urine or dried blood spot specimens are underway. Challenges to screening are both practical-uncertain sensitivity of blood spot assays suitable for large-scale screening and lack of infrastructure for collection of urine specimens; and evidentiary-the need to demonstrate improved outcomes and value of screening to offset the expense and potential adverse psychosocial consequences for children and families whose children require periodic monitoring but never develop sequelae. Screening for congenital CMV infection is a potentially important intervention that merits additional research, including the logistical feasibility of different screening options and psychosocial consequences for families.

  13. The nuclear power option. Proceedings of an international conference on the nuclear power option held in Vienna, 5-8 September 1994

    International Nuclear Information System (INIS)

    1995-01-01

    At 11 sessions of the conference present status and different aspects of future nuclear power development were discussed. About 150 participants from 37 countries and 7 international organizations attended the conference. 57 papers were presented. A separate abstract was prepared for each of these papers. Refs, figs and tabs

  14. Annual conference on nuclear technology. Nuclear power 2001: option for the future

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    The Dresden Palace for Culture was the venue of the ANNUAL MEETING ON NUCLEAR TECHNOLOGY on May 15-17, 2001, the first to be held in Dresden and the first also to be held in one of the new German federal states. Although no nuclear plant is in operation in East Germany after the Greifswald Nuclear Power Station was decommissioned, nuclear technology continues to play an important role especially in research and university teaching in this part of Germany. The organizers of the conference, Deutsches Atomforum e.V. (DAtF) and Kerntechnische Gesellschaft e.V. (KTG), welcomed more than 1000 participants from nineteen countries. The three-day program, with its traditional, proven structure, featured plenary sessions on the first day, and specialized sessions, technical sessions, poster sessions, and other events on the following days. The partner country at the Annual Meeting on Nuclear Technology was Russia, with a session specially devoted to selected topics of the country. The conference was accompanied by a technical exhibition with company meeting points of vendors, suppliers, and service industries. A video film forum was arranged for the interested public which featured contributions about nuclear research, nuclear power plant operation, transport and storage as well as decommissioning. Another major event was a workshop on 'Preserving Competence in Nuclear Technology'. The plenary day is described in this summary report, while the results of the technical sessions as seen by the rapporteurs are printed elsewhere in this issue of atw 8/9, 2001. (orig.) [de

  15. An evaluation of greenhouse gas mitigation options for coal-fired power plants in the US Great Lakes States

    International Nuclear Information System (INIS)

    Froese, Robert E.; Shonnard, David R.; Miller, Chris A.; Koers, Ken P.; Johnson, Dana M.

    2010-01-01

    We assessed options for mitigating greenhouse gas emissions from electricity generation in the US Great Lakes States, a region heavily dependent on coal-fired power plants. A proposed 600 MW power plant in northern Lower Michigan, USA provided context for our evaluation. Options to offset fossil CO 2 emissions by 20% included biomass fuel substitution from (1) forest residuals, (2) short-rotation woody crops, or (3) switchgrass; (4) biologic sequestration in forest plantations; and (5) geologic sequestration using CO 2 capture. Review of timber product output data, land cover data, and expected energy crop productivity on idle agriculture land within 120 km of the plant revealed that biomass from forestry residuals has the potential to offset 6% and from energy crops 27% of the annual fossil fuel requirement. Furthermore, annual forest harvest in the region is only 26% of growth and the surplus represents a large opportunity for forest products and bioenergy applications. We used Life Cycle Assessment (LCA) to compare mitigation options, using fossil energy demand and greenhouse gas emissions per unit electricity generation as criteria. LCA results revealed that co-firing with forestry residuals is the most attractive option and geologic sequestration is the least attractive option, based on the two criteria. Biologic sequestration is intermediate but likely infeasible because of very large land area requirements. Our study revealed that biomass feedstock potentials from land and forest resources are not limiting mitigation activities, but the most practical approach is likely a combination of options that optimize additional social, environmental and economic criteria.

  16. Fourteen lessons learned from the successful nuclear power program of the Republic of Korea

    International Nuclear Information System (INIS)

    Choi, Sungyeol; Jun, Eunju; Hwang, IlSoon; Starz, Anne; Mazour, Tom; Chang, SoonHeung; Burkart, Alex R.

    2009-01-01

    This paper summarized a development history and lessons of Korean nuclear power infrastructures from the beginning of the nuclear power program in 1956 to the localization of complete scope of PWR technology in 1990. The objective of this paper is to show the guideline on the issues that the development of a national infrastructure for nuclear power using the realistic experiences in order to help the developing countries newly starting nuclear power program as a long-term energy supply option. Development strategies and lessons learned from the successful Korean experience have been presented based on milestones structure of IAEA in order to help decision makers, advisers, senior managers and national planners of nuclear power program. Lessons for national nuclear power programs include considerations before launching a program, preparation and decision making, and the construction of the first nuclear power plant. Scope of these lessons includes knowledge and human resources management, financial and industrial infrastructure development, nuclear safety, legislative and regulatory experiences, fuel cycle and waste management, international cooperation. Fourteen lessons learned either positive or not are derived from the Korean case and are suggested for incorporation in the IAEA's efforts in support of developing countries' development of nuclear infrastructure and planning.

  17. Green power programs in Canada : 2003 : overview of Government green power policies, utility green power implementation initiatives, green power and certificate marketing programs, and their benefits

    International Nuclear Information System (INIS)

    Whitmore, J.; Bramley, M.; Holmes, R.

    2004-09-01

    Green power is defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. It offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities in Canada associated with these four categories in 2003 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Green power generation facilities in 2003 totaled 775 MW of capacity compared to 539 MW in 2002. Hydro capacity represented 41 per cent, followed by wind capacity at 40 per cent and wood waste at 17 per cent. Most of the green power generation facilities in 2003 were located in Alberta, followed by British Columbia, Ontario and Quebec. 230 refs., 8 tabs., 1 fig

  18. Lessons learned -- NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Flowers, L.

    1998-07-01

    In 1993, a workshop was convened at the National Renewable Energy Laboratory (NREL) to discuss the issues of applying renewable energy in a sustainable manner to international rural development. One of the summary recommendations was that NREL could assist in the renewable energy for rural electrification effort by developing and supplying six related activities: resource assessment, comparative analysis and modeling, performance monitoring and analysis, pilot project development, internet-based project data, communications, and training. In response to this recommendation, NREL launched its Village Power Program consisting of these activities that cut across NREL technologies and disciplines. Currently NREL is active in 20 countries, with pilot projects in 12 of those countries. At this time the technologies include photovoltaics, wind, biomass, and hybrids. The rural applications include home lighting and communications, water pumping, schools and health posts, battery charging stations, ecotourism, and village systems. These pilot projects are central to the renewable energy village power development through the demonstration of three aspects critical to replication and implementation of the projects on a significant scale. The three aspects are technical functionality, economic competitiveness, and institutional sustainability. It is important to note that the pilot projects from which NREL's experience has been gained were funded and, in many cases, developed by other organizations and agencies. NREL's role has been one of technical assistance or project management or both. The purpose of this paper is to describe the lessons NREL staff has gleaned from their participation in the various pilot projects. The author hopes that these lessons will help the Renewable Energy-Based Rural Electrification (RERE) community in implementing sustainable projects that lead to replication.

  19. Computer program analyzes and monitors electrical power systems (POSIMO)

    Science.gov (United States)

    Jaeger, K.

    1972-01-01

    Requirements to monitor and/or simulate electric power distribution, power balance, and charge budget are discussed. Computer program to analyze power system and generate set of characteristic power system data is described. Application to status indicators to denote different exclusive conditions is presented.

  20. Concentrating Solar Power Program Review 2013 (Book) (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    2013-06-01

    This U.S. Department of Energy (DOE) Concentrating Solar Power Program Review Meeting booklet will be provided to attendees at the Concentrating Solar Power Review Meeting in Phoenix, Arizona on April 23-25, 2013.

  1. Gene expression programming for power system static security ...

    African Journals Online (AJOL)

    user

    Keywords: static security, gene expression programming, probabilistic neural network ... Hence digital computers are usually installed in operations control centers to gather ...... power system protection, and applications of AI in power systems.

  2. 2015 Key Water Power Program and National Laboratory Accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Office of Energy Efficiency and Renewable Energy

    2016-01-01

    The U.S. Department of Energy Water Power Program is committed to developing and deploying a portfolio of innovative technologies and market solutions for clean, domestic power generation from water resources across the United States.

  3. Pricing of contract options for electric power; Precificacao de contrato de opcoes de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Leticia; Gunn, Laura Keiko; Correia, Paulo B. [Universidade Estadual de Campinas (FEM/UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica. Dept. de Energia

    2008-07-01

    The reorganization of the electric sector has improved the opportunity of energy trade through contracts, which have to be considered on the risk evaluation for generating companies. Different types of contracts have been used in electric energy commercialization. This work develops a model for option contract pricing. The classic model of options pricing used in the financial market is based in Black- Scholes. Due to the inherent feature of the Brazilian electrical system, with a strong predominance of hydroelectricity, the seasonal swing of the electricity price is the main source of contractual risk. So, the Black-Scholes model very is not adjusted. To deal with the uncertainties, this work uses an approach based on analysis of scenarios and binomial trees. Case studies are analyzed with binomial tree to calculate the price of the option contract. (author)

  4. Studying heat integration options for steam-gas power plants retrofitted with CO2 post-combustion capture

    International Nuclear Information System (INIS)

    Carapellucci, Roberto; Giordano, Lorena; Vaccarelli, Maura

    2015-01-01

    Electricity generation from fossil fuels has become a focal point of energy and climate change policies due to its central role in modern economics and its leading contribution to greenhouse gas emissions. Carbon capture and sequestration (CCS) is regarded by the International Energy Agency as an essential part of the technology portfolio for carbon mitigation, as it can significantly reduce CO 2 emissions while ensuring electricity generation from fossil fuel power plants. This paper studies the retrofit of natural gas combined cycles (NGCCs) with an amine-based post-combustion carbon capture system. NGCCs with differently rated capacities were analysed under the assumptions that the heat requirement of the capture system was provided via a steam extraction upstream of the low-pressure steam turbine or by an auxiliary unit that was able to reduce the power plant derating related to the energy needs of the CCS system. Different types of auxiliary units were investigated based on power plant size, including a gas turbine cogeneration plant and a supplementary firing unit or boiler fed by natural gas or biomass. Energy and economic analyses were performed in order to evaluate the impact of type and layout of retrofit option on energy, environmental and economic performance of NGCCs with the CCS system. - Highlights: • Steam-gas power plants with an amine-based CO 2 capture unit are examined. • The study concerns three combined cycles with different capacity and plant layout. • Several options to fulfil the heat requirement of the CCS system are explored. • Steam extraction significantly reduces the capacity of steam-gas power plant. • An auxiliary combined heat and power unit allows to reduce power plant derating

  5. A Computer Program for Short Circuit Analysis of Electric Power ...

    African Journals Online (AJOL)

    The Short Circuit Analysis Program (SCAP) is to be used to assess the composite effects of unbalanced and balanced faults on the overall reliability of electric power system. The program uses the symmetrical components method to compute all phase and sequence quantities for any bus or branch of a given power network ...

  6. Concentrated Solar Power as part of the European energy supply. The realization of large-scale solar power plants. Options, constraints and recommendations

    International Nuclear Information System (INIS)

    Bouwmans, I.; Carton, L.J.; Dijkema, G.P.J.; Stikkelman, R.M.; De Vries, L.J.

    2006-01-01

    Next to solar cells and solar collectors for decentralized power generation Concentrated Solar Power (CSP) technology is available and proven for large-scale application of solar energy. However, after 20 years of demonstration projects and semi-commercial installations, CSP is still not widely used. In this quick-scan an overview is given of strong and weak points of CSP, as well as its' options and constraints with regard to a sustainable energy supply, focusing on technical, economical and administrative constraints and chances in Europe and European Union member states [nl

  7. Nuclear power programs in developing countries of the world: Southeast Asia

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This article reviews the present and future status of the nuclear industry in the developing nations of China, North Korea, Thailand, Indonesia, and the Philippines. Each of the countries has a booming export-driven economy, which is turn requires considerable new generating capacity. The nuclear option is being considered as a provider of much of this additional capacity. China is committed to an extensive nuclear power program, and Indonesia has an ambitious plan to have seven to twelve reactors in service by the year 2015. North Korea will receive two LWRs to replace its current non-power nuclear units. The nuclear option is still under discussion in the Philippines and in Thailand

  8. Electric-powered passenger vehicle design study program. Task 1. Tradeoff studies

    Energy Technology Data Exchange (ETDEWEB)

    Rowlett, B.H.

    1976-09-16

    Using the baseline vehicle and power system design established previously to meet the performance goals of the program, three power system computer simulation programs were prepared for the basic vehicle tradeoff studies. These programs simulate the performance of the power system and vehicle over different types of driving conditions such as maximum power acceleration, deceleration, city driving cycles, and hill climbing, and permit accurate determination of the benefits of the unique hybrid power system, the total energy required for the suburban city driving cycle, and the extremes of the operating envelopes of the components so that component design options can be defined and studied. Component design tradeoff studies were conducted, including sensitivity studies to show the criticality of the various losses and unknowns in the analytical models. Also, preliminary vehicle layout studies were performed to determine the best locations of the power system and the batteries. Three basic design options are identified for further study. Economic studies were initiated using analytical models to establish the complete vehicle weight and cost breakdowns. Preliminary reliability and safety studies were completed, and maintainability and safety certification criteria established. The detailed analysis of the power system has verified the feasibility of the system and of the performance expectations. Also, the feasibility of energy recovery from regenerative braking has been confirmed. The sensitivity analysis of the power system shows that sufficient margin for unknown design variables is provided. The preliminary economic analysis indicates that the most difficult objective of the study will be the selection of the cost and weight relationships which are required to achieve the overall cost objectives.

  9. Specific and Optional Curriculum: An Experience in the Undergraduate Program of Chemical Engineering in Cienfuegos University, Cuba

    Science.gov (United States)

    Martínez, Yolanda García; Velázquez, Claudia Alvarado; Castillo, Rolando Delgado

    2016-01-01

    This paper pursues to define the pillars for designing the specific (SC) and optional curricula (OC) of Unit Operations and Processes (UOP) Discipline in the Chemical Engineering Program. To achieve this objective a methodology was developed, which was characterized by the participation of every member in the educational process: professors,…

  10. Economic feasibility of pipe storage and underground reservoir storage options for power-to-gas load balancing

    International Nuclear Information System (INIS)

    Budny, Christoph; Madlener, Reinhard; Hilgers, Christoph

    2015-01-01

    Highlights: • Study of cost effectiveness of power-to-gas and storage of H 2 and renewable methane. • NPV analysis and Monte Carlo simulation to address fuel and electricity price risks. • Gas sale is compared with power and gas market arbitrage and balancing market gains. • Power-to-gas for linking the balancing markets for power and gas is not profitable. • Pipe storage is the preferred option for temporal arbitrage and balancing energy. - Abstract: This paper investigates the economic feasibility of power-to-gas (P2G) systems and gas storage options for both hydrogen and renewable methane. The study is based on a techno-economic model in which the net present value (NPV) method and Monte Carlo simulation of risks and price forward curves for the electricity and the gas market are used. We study three investment cases: a Base Case where the gas is directly sold in the market, a Storage & Arbitrage Case where temporal arbitrage opportunities between the electricity and the gas market are exploited, and a Storage & Balancing Case where the balancing markets (secondary reserve market for electricity, external balancing market for natural gas) are addressed. The optimal type and size of different centralized and decentralized storage facilities are determined and compared with each other. In a detailed sensitivity and cost analysis, we identify the key factors which could potentially improve the economic viability of the technological concepts assessed. We find that the P2G system used for bridging the balancing markets for power and gas cannot be operated profitably. For both, temporal arbitrage and balancing energy, pipe storage is preferred. Relatively high feed-in tariffs (100 € MW −1 for hydrogen, 130 € MW −1 for methane) are required to render pipe storage for P2G economically viable

  11. Management options for implementing a basic and applied research program responsive to CS technology base needs. Task VIII. Review existing CS materials R and D programs

    Energy Technology Data Exchange (ETDEWEB)

    1980-02-28

    Possibilities for setting up a basic and applied research program that would be responsive to the Conservation and Solar energy base needs are considered with emphasis on the area of materials research. Several organizational arrangements for the implementation of this basic and applied research program are described and analyzed. The key functions of the system such as resources allocation, and program coordination and management follow from two fundamental characteristics: assignment of lead responsibility (CS and the Office of Energy Research, ER); and nature of the organizational chain-of-command. Three options are categorized in terms of these two characteristics and discussed in detail. The first option retains lead responsibility in ER, with CS personnel exercising sign-off authority and filling the coordination role. Option 2 places lead responsibility with CS program office management, and utilizes the existing chain-of-command, but adds a Basic and Applied Research Division to each program office. Option 3 also places lead responsibility with CS, but within a new Office of Basic and Applied Research, which would include a Research Coordinator to manage interactions with ER, and Research Managers for each CS program area. (MCW)

  12. The role of LDCs in conservation and demand management in 2007 : the Ontario Clean Air Alliance's response to the Ontario Power Authority's options paper

    International Nuclear Information System (INIS)

    Gibbons, J.

    2006-01-01

    A response to The Ontario Power Authority (OPA) discussion paper on the role of local distribution companies (LDC) was presented, with reference to conservation and demand management (CDM). This paper examined 2 implicit issues raised by the OPA paper: (1) the appropriate role of the OPA with respect to conservation and demand management, and (2) the role of the Ontario Energy Board (OEB) in streamlining its CDM regulatory approval process. It was suggested that LDCs are ideal agencies for the delivery of CDM as they are trusted sources of energy information and have existing business relationships with electricity consumers. Local electric utilities understand local conditions and needs and are better placed to meet them. Ontario's electric utilities are now eligible for conservation profit bonuses equal to 5 per cent of the bill savings that their energy efficiency programs create for customers. It was noted that the benefits of CDM programs have already been demonstrated. The establishment of CDM budget targets was advised. Options to finance CDM programs were reviewed, as well as various energy efficiency programs. It was suggested that the OPA should continue to be a strong public advocate for CDM, and promote stricter provincial and federal energy efficiency standards. Recommendations for streamlining the OEB's CDM regulatory approval process were presented. It was concluded that marginalizing the role of Ontario's electric utilities in the delivery of CDM programs will short-circuit Ontario's efforts to develop a conservation culture. 13 refs

  13. Overall quality assurance program requirements for nuclear power plants

    International Nuclear Information System (INIS)

    1992-09-01

    This standard contains the requirements for the owner's overall quality assurance program for a nuclear power plant. This program encompasses all phases of a nuclear power plant life cycle, including site evaluation, design, procurement, manufacturing, construction and installation, commissioning, operation, and decommissioning. It covers the activities associated with specifying, directing, and administering the work to be done during these phases, and the evaluation and integrated of the activities and programs of participants

  14. Photovoltaic power supplies: Energy option feasibility. Solare fotovoltaico come opzione energetica

    Energy Technology Data Exchange (ETDEWEB)

    Coiante, D.; Barra, L. (ENEA, Casaccia (Italy). Area Energetica)

    1993-01-01

    Commercialization prospects for grid connected, stand-alone and hydrogen- production photovoltaic power plants are assessed. The paper traces the evolution of the development of photovoltaic modules and correlates trends in R D expenditure and progress made with subsequent drops in the cost of photovoltaic power equipment. Assessments are made of limits in the marketability of grid connected photovoltaic power supplies and comments are made as to the wisdom of the current directions being taken by research groups operating in this field.

  15. Spanish program of advanced Nuclear Power Plants

    International Nuclear Information System (INIS)

    Marco, M.; Redon, R.

    1993-01-01

    The energy Spanish Plan is promoting some actions within the area of advanced reactors. Efforts are focussed onto the European Program of Advanced Reactors, the Program of Passive Plants (EPRI), European Fast Reactor Project and the APWR-1000 Program of INI. Electrical sector utilities and industrial partners supported by the Administration have organized an steering committee. The program of Passive Plants includes activities on Qualification, design and detailed engineering (Qualification project, SBWR project of G.E. and AP600 Project of Westinghouse. The european project on advanced plants has the following Spanish contribution: Analysis of alternative Dossier on European requisites (EUR) and Design of an European Reactor (EPR)

  16. The power professorship program at Washington State University

    International Nuclear Information System (INIS)

    Mosher, C.C.; Shamash, Y.

    1993-01-01

    As with most electric power programs, Washington State University's has existed since the beginning of the engineering program 100 years ago. It has grown and developed largely through the efforts of a few dedicated individuals. The Power Professorship Program has existed since 1972. The Power Professor has been Dr. Clifford C. Mosher until his recent semi-retirement. The Power Professorship was conceived of as an avenue for joint university-industry interaction. Considerable time and ingenuity by visionary engineers and others have resulted in development of a financial base for the Power Professorship Program. The program has been funded equally by public and investor-utility sectors. Following financial difficulties stemming from the Washington Public Power Supply System financial default on public utility bonds for several nuclear projects, funding for the program from the public sector was canceled. After several lean years, public-sector support was again restored by WSU's electrical engineering department offering a contract for services to the utilities in exchange for funding. This contract has been renewed annually, with costs and benefits firmly established through careful analysis and consultation. Problems facing the power industry in the early 1970s with regard to establishing a pipeline of future human resources, were almost identical with those of the present time: indifferent feelings about the industry in general, students being attracted to more glamorous disciplines, and a decline in educational opportunities available in the power area. A 1985 article in the IEEE Power Engineering Review describing today's declining enrollment in power engineering applies equally well to previous periods. A major driving force for initiating utility-industry participation in the Power Professorship Program was the concern for maintaining a source of entry-level engineers with a background in power engineering

  17. Dewitt Wallace-Reader's Digest Fund National Library Power Program.

    Science.gov (United States)

    School Library Media Annual (SLMA), 1993

    1993-01-01

    Describes the National Library Power Program, a collaborative effort sponsored by the Dewitt Wallace-Reader's Digest Fund in cooperation with local education funds and public school districts that was designed to create public elementary and middle school library programs that are central to the education program of the school. (LRW)

  18. A review of Danish integrated multi-energy system flexibility options for high wind power penetration

    DEFF Research Database (Denmark)

    Wang, Jiawei; Zong, Yi; You, Shi

    2017-01-01

    The current status of wind power and the energy infrastructure in Denmark is reviewed in this paper. The reasons for why Denmark is a world leader in wind power are outlined. The Danish government is aiming to achieve 100% renewable energy generation by 2050. A major challenge is balancing load...

  19. Options for sustaining solar-powered mosquito trapping systems on Rusinga Island, Western Kenya

    NARCIS (Netherlands)

    Oria, Prisca A.; Wijnands, Michiel; Alaii, Jane; Leeuwis, Cees

    2018-01-01

    Background: In 2012, a donor-supported proof of principle study was launched to eliminate malaria from Rusinga Island, western Kenya, using solar-powered mosquito trapping systems (SMoTS). SMoTS, which also provided power for room lighting and charging mobile telephones, were installed in houses. In

  20. Potential impact of (CET) carbon emissions trading on China’s power sector: A perspective from different allowance allocation options

    OpenAIRE

    Cong, Rong-Gang; Wei, Yi-Ming

    2010-01-01

    In Copenhagen climate conference China government promised that China would cut down carbon intensity 40e45% from 2005 by 2020. CET (carbon emissions trading) is an effective tool to reduce emissions. But because CET is not fully implemented in China up to now, how to design it and its potential impact are unknown to us. This paper studies the potential impact of introduction of CET on China’s power sector and discusses the impact of different allocation options of allowances. Agent-based mod...

  1. Exchange program. Alternative options for purchase of environmentally friendly vehicles in Stockholm

    Energy Technology Data Exchange (ETDEWEB)

    Rader Olsson, Amy [Inregia AB, Stockholm (Sweden); Elam, N. [Atrax Energi AB, Goeteborg (Sweden)

    1999-11-01

    The city of Stockholm has decided to exchange 300 of its gasoline-driven vehicles for vehicles which emit fewer hazardous pollutants. A vehicle exchange program is being developed based on analyses which describe the driving patterns of Stockholm's vehicles, alternative fuel technology status, and financing alternatives. This report comprises the first two analyses, that of Stockholm's fleet driving patterns and alternative fuel technology options. The report has four major sections: * a technical analysis of the status of certain fuels and vehicles, including prognoses of availability in Sweden and the future development potential of each. (electric, biogas, ethanol, RME), * a driving study, which identifies those vehicles currently in Stockholm's fleet which could be exchanged for alternatively-fueled vehicles, * an analysis of five purchase package alternatives, and * a location analysis, which describes the accessibility of vehicles in each alternative to alternative fuel refueling facilities in Stockholm. Given current prices and availability of the alternative fuels and vehicles studied, we recommend a high share of electric and biogas vehicles for purchases during 1997. The cost-effectiveness of different vehicle types in their reduction of various hazardous pollutants, may however change dramatically as prices and availability of vehicles changes and the market for alternative fuels develops. Accessibility to alternative fuel refueling facilities is adequate in Stockholm, though not always ideal. To improve the accessibility of biogas vehicles further, we suggest a third biogas refueling facility in the city's northeastern area (Ropsten, Vaertahamnen). If MFO chooses to purchase a significant number of diesel passenger vehicles to be driven on RME; we propose that a facility in the northeastern area would improve accessibility more than another facility in southern Stockholm.

  2. Satellite Power System (SPS) Program Summary

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    The joint DOE/NASA SPS program has as its objective to achieve by the end of 1980 an initial understanding of the technical feasibility, economic practicability, and the social and environmental acceptability of the SPS concepts so that recommendations concerning program continuation can be made. The four major study areas include (1) systems definition; (2) environmental assessment; (3) societal assessment; and (4) comparative assessment of alternative energy systems. All the projects on the SPS program are listed and summarized for FY 1978. (WHK)

  3. Developing Countries and Global Climate Change: Electric Power Options for Growth

    National Research Council Canada - National Science Library

    Bernstein, Mark

    1999-01-01

    .... If these investments are made according to business-as-usual (BAU) investment trends, CO(2) emissions from developing country power generation will nearly triple their 1995 levels within 20 years...

  4. Assessment of DoD Electric Power Supply Options, Strategies, and Costs Under Retail Open Access

    National Research Council Canada - National Science Library

    Cameron, Pamela

    1997-01-01

    .... At the same time, significant changes in generation technology and reductions in fuel prices have reduced the cost of power from new generating facilities, driving down competitive prices for generation...

  5. A Dynamic Programming based method for optimizing power system restoration with high wind power penetration

    DEFF Research Database (Denmark)

    Hu, Rui; Hu, Weihao; Li, Pengfei

    2016-01-01

    and relatively low cost. Thus, many countries are increasing the wind power penetration in their power system step by step, such as Denmark, Spain and Germany. The incremental wind power penetration brings a lot of new issues in operation and programming. The power system sometimes will operate close to its...... stable limits. Once the blackout happens, a well-designed restoration strategy is significant. This paper focuses on how to ameliorate the power system restoration procedures to adapt the high wind power penetration and how to take full advantages of the wind power plants during the restoration....... In this paper, the possibility to exploit the stochastic wind power during restoration was discussed, and a Dynamic Programming (DP) method was proposed to make wind power contribute in the restoration rationally as far as possible. In this paper, the method is tested and verified by a modified IEEE 30 Buses...

  6. Non-Power Purchase Agreement (PPA) Options for Financing Solar Deployment at Universities

    Energy Technology Data Exchange (ETDEWEB)

    2016-10-01

    Financing solar using power purchase agreements (PPAs) has facilitated solar deployment of more than 100 megawatts (MW) at universities--as compared to 50 MW facilitated by financing models not using PPAs. This brochure, which overviews existing financing models and funding mechanisms available for solar procurement, focuses on non-PPA financing models. For more information on solar deployment at universities using PPAs, refer to Using Power Purchase Agreements for Solar Deployment at Universities.

  7. Programs and experiences in electric power conservation

    International Nuclear Information System (INIS)

    Jintao, X.

    1989-01-01

    The report presents a brief introduction of the present situation and future prospects of the energy and power sector in China. Since 1979, China has been carrying out the new economic policies, the national economy has grown rapidly but somewhat out of step with the production of energy and power which has appeared to be shortfall in most parts of the Country and become more and more an obstacle to the economic development. To solve this problem, we have launched an ambitious programme to promote the production of energy and power on one hand, and to implement strict conservation measures on the other. In this regard, international technical and economical cooperation is imperative. (author)

  8. Solid State Power Controller Fuse Development Program.

    Science.gov (United States)

    1983-10-01

    4NYP Appendix A nic =,-, ’XW LX, nII4CD1AFam" CC,’AP44 257-290 TABLE I - FAULT CURRENT TRIP TJMWS Fa’ Ii AC Volts Seconds Rema:ks 1. 1.6 100Z 234.0 417.0...calibration date: 12 July 1983 Biddle Power Rheostat, 1000 W, Cat. No. 20 4.2 Procedure Testing was accomplished in two lots, one consisting of the SPC-2A and...Last calibration date: 12 July 1983 Biddle 100dW Power Rheostat, Cat. No. 20 Variac, Environ No. 380-503 4.2 Procedure The test specimens were suspended

  9. Subsurface Hybrid Power Options for Oil & Gas Production at Deep Ocean Sites

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, J C; Haut, R; Jahn, G; Goldman, J; Colvin, J; Karpinski, A; Dobley, A; Halfinger, J; Nagley, S; Wolf, K; Shapiro, A; Doucette, P; Hansen, P; Oke, A; Compton, D; Cobb, M; Kopps, R; Chitwood, J; Spence, W; Remacle, P; Noel, C; Vicic, J; Dee, R

    2010-02-19

    An investment in deep-sea (deep-ocean) hybrid power systems may enable certain off-shore oil and gas exploration and production. Advanced deep-ocean drilling and production operations, locally powered, may provide commercial access to oil and gas reserves otherwise inaccessible. Further, subsea generation of electrical power has the potential of featuring a low carbon output resulting in improved environmental conditions. Such technology therefore, enhances the energy security of the United States in a green and environmentally friendly manner. The objective of this study is to evaluate alternatives and recommend equipment to develop into hybrid energy conversion and storage systems for deep ocean operations. Such power systems will be located on the ocean floor and will be used to power offshore oil and gas exploration and production operations. Such power systems will be located on the oceans floor, and will be used to supply oil and gas exploration activities, as well as drilling operations required to harvest petroleum reserves. The following conceptual hybrid systems have been identified as candidates for powering sub-surface oil and gas production operations: (1) PWR = Pressurized-Water Nuclear Reactor + Lead-Acid Battery; (2) FC1 = Line for Surface O{sub 2} + Well Head Gas + Reformer + PEMFC + Lead-Acid & Li-Ion Batteries; (3) FC2 = Stored O2 + Well Head Gas + Reformer + Fuel Cell + Lead-Acid & Li-Ion Batteries; (4) SV1 = Submersible Vehicle + Stored O{sub 2} + Fuel Cell + Lead-Acid & Li-Ion Batteries; (5) SV2 = Submersible Vehicle + Stored O{sub 2} + Engine or Turbine + Lead-Acid & Li-Ion Batteries; (6) SV3 = Submersible Vehicle + Charge at Docking Station + ZEBRA & Li-Ion Batteries; (7) PWR TEG = PWR + Thermoelectric Generator + Lead-Acid Battery; (8) WELL TEG = Thermoelectric Generator + Well Head Waste Heat + Lead-Acid Battery; (9) GRID = Ocean Floor Electrical Grid + Lead-Acid Battery; and (10) DOC = Deep Ocean Current + Lead-Acid Battery.

  10. Radiation Monitoring - A Key Element in a Nuclear Power Program

    International Nuclear Information System (INIS)

    Hussein, A.S.; El-dally, T.A.

    2008-01-01

    For a nuclear power plant, radiation is especially of great concern to the public and the environment. Therefore, a radiation monitoring program is becoming a critical importance. This program covers all phases of the nuclear plant including preoperational, normal operation, accident and decommissioning. The fundamental objective of radiation monitoring program is to ensure that the health and safety of public inside and around the plant and to confirm the radiation doses are below the dose limits for workers and the public. This paper summarizes the environmental radiation monitoring program for a nuclear power plant

  11. Programmed system for nuclear power plant protection

    International Nuclear Information System (INIS)

    Jover, Pierre.

    1980-06-01

    The progress in the field of microprocessors and large scale integration circuits, have incited to introduce this new technologies into nuclear power plant protection system. The hardware and software design principles are briefly listed; then, a quad-redundant protection system for 1300 MWe PWR, developed in France is described [fr

  12. Availability, reliability and logistic support studies of the RF power system design options for the IFMIF accelerator

    International Nuclear Information System (INIS)

    Bargallo, E.; Giralt, A.; Martinez, G.; Weber, M.; Regidor, D.; Arroyo, J.M.; Abal, J.; Dies, J.; Tapia, C.; De Blas, A.; Mendez, P.; Ibarra, A.; Molla, J.

    2013-01-01

    Highlights: ► Current RF system design based on tetrodes chains is evaluated. ► Alternative solid state power amplifiers RF system design is analyzed. ► Both designs are compared in terms of availability, logistics and cost. ► It is concluded that solid state option presents relevant improvements. -- Abstract: The current design of the radio frequency (RF) power system for the International Fusion Materials Irradiation Facility (IFMIF) is based upon tetrodes technology. Due to the improvement in the solid state amplifiers technology, the possibility of using this option for IFMIF RF system is becoming a very competitive alternative presenting from the beginning several advantages in terms of availability, reliability and logistics. The current design based on RF tetrodes chains leads no room for substantial improvements in terms of availability being the requirement for the RF system hard to achieve. The principal goals of this paper are to use RAMI (Reliability, Availability, Maintainability and Inspectionability) analysis in the solid state amplifier design, and to compare the availability, reliability and logistic performances for both alternatives

  13. Availability, reliability and logistic support studies of the RF power system design options for the IFMIF accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Bargallo, E., E-mail: enric.bargallo-font@upc.edu [Fusion Energy Engineering Laboratory (FEEL), Technical University of Catalonia (UPC) Barcelona-Tech, Barcelona (Spain); Giralt, A.; Martinez, G. [Fusion Energy Engineering Laboratory (FEEL), Technical University of Catalonia (UPC) Barcelona-Tech, Barcelona (Spain); Weber, M.; Regidor, D.; Arroyo, J.M. [Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas, Madrid (Spain); Abal, J.; Dies, J.; Tapia, C.; De Blas, A. [Fusion Energy Engineering Laboratory (FEEL), Technical University of Catalonia (UPC) Barcelona-Tech, Barcelona (Spain); Mendez, P.; Ibarra, A.; Molla, J. [Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas, Madrid (Spain)

    2013-10-15

    Highlights: ► Current RF system design based on tetrodes chains is evaluated. ► Alternative solid state power amplifiers RF system design is analyzed. ► Both designs are compared in terms of availability, logistics and cost. ► It is concluded that solid state option presents relevant improvements. -- Abstract: The current design of the radio frequency (RF) power system for the International Fusion Materials Irradiation Facility (IFMIF) is based upon tetrodes technology. Due to the improvement in the solid state amplifiers technology, the possibility of using this option for IFMIF RF system is becoming a very competitive alternative presenting from the beginning several advantages in terms of availability, reliability and logistics. The current design based on RF tetrodes chains leads no room for substantial improvements in terms of availability being the requirement for the RF system hard to achieve. The principal goals of this paper are to use RAMI (Reliability, Availability, Maintainability and Inspectionability) analysis in the solid state amplifier design, and to compare the availability, reliability and logistic performances for both alternatives.

  14. Fuel cell power on board a yacht - the gat option for boating and yachting

    Energy Technology Data Exchange (ETDEWEB)

    Rohland, B.; Schuldzig, H.G.; Adolf, F. [Gesellschaft fuer Angewandte Technik mbH Greifswald, Greifswald (Germany)

    2001-07-01

    Today the electric power on board of a yacht is provided by 12 V / 60-150 Ah batteries. The storage capacity of 0.7 - 1.8 kWh is too low for long term cruising without loading by the alternator. A higher storage of more than 5 kWh has Fuel Cells, powered by hydrogen or better by methanol. At first we construct a stand alone PEMFC-facility for on board production of 12 V DC power of 250 W{sub e1}, which was let operated by Hydrogen from a Ni-Hydridcylinder of 2.3 l volume. GAT has constructed a facility for on board application of a methanol-powered PEM-Fuel Cell with a storage capacity of more than 5 kWh and a peak power of 200 W{sub e1}. Some technical data of the GAT-PEMFC-apparatus and the schedule of the first field tests would be presents. (orig.)

  15. Technology options for clean coal power generation with CO2 capture

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Song; Bergins, Christian; Kikkawa, Hirofumi; Kobayashi, Hironobu; Kawasaki, Terufumi

    2010-09-15

    The state-of-the-art coal-fired power plant today is about 20% more efficient than the average operating power plants, and can reduce emissions such as SO2, NOx, and mercury to ultra-low levels. Hitachi is developing a full portfolio of clean coal technologies aimed at further efficiency improvement, 90% CO2 reduction, and near-zero emissions, including 700 deg C ultrasupercritical boilers and turbines, post-combustion CO2 absorption, oxyfuel combustion, and IGCC with CCS. This paper discusses the development status, performance and economic impacts of these technologies with focus on post combustion absorption and oxyfuel combustion - two promising CO2 solutions for new and existing power plants.

  16. Indonesia - nuclear power as option for the future. Indonesien - Kernenergie als Zukunftsoption

    Energy Technology Data Exchange (ETDEWEB)

    Wiesegart, K [Zentrale Exportabteilung, Asea Brown Boveri (ABB) AG, Mannheim (Germany)

    1993-11-01

    The Republic of Indonesia consists of 13.600 islands, about 6.000 of them are populated. More than half of the ca. 182 mio. inhabitants (1991) live on the main island Java which only has a share of 7% of the total area of the East Asian country. The developing country Indonesia is characterized by economic stability - according to the World Bank its chances to reach the circle of industrialized countries till the year 2000 are good. But electricity supply of the country lags behind overall economic development. Here about 20% of the demand can not be covered. There are high losses in energy production, transmission and distribution. The Indonesian government plans extensions in the power supply area, a doubling of 1991 capacities are strived for till 2000. Financially this is to be attained with the instruments denationalization and deregulation. Apart from coal, water power and geothermal energy now also nuclear power will be used. (orig.)

  17. Power sector reforms in Ethiopia: options for promoting local investments in rural electrification

    Energy Technology Data Exchange (ETDEWEB)

    Teferra, Mengistu [Ministry of Economic Development and Co-operation, Addis Ababa (Ethiopia)

    2002-09-01

    An estimated 13% of Ethiopia's population has access to electricity. Almost all electrified centres are urban, with rural areas as well as most small rural towns largely unelectrified. Rural electrification (RE) thus remains a major challenge to the power sector of Ethiopia. The national power utility (EEPCO) has traditionally been assigned the task of electrifying rural demand centres. EEPCO has, however, concentrated on the more developed and profitable urban areas. The objective of this article is to present the findings of a study that examined whether the ongoing power sector reforms in Ethiopia can attract private investment in RE as an alternative to the sole reliance on EEPCO. Initial findings of the study indicate that private investment in RE can be enhanced with some improvement in the legal and regulatory provisions, along with extension of technical assistance from EEPCO to private investors. (Author)

  18. Heatpipe power system and heatpipe bimodal system design and development options

    International Nuclear Information System (INIS)

    Houts, M.G.; Poston, D.I.; Emrich, W.J. Jr.

    1997-01-01

    The Heatpipe Power System (HPS) is a potential, near-term, low-cost space fission power system. The Heatpipe Bimodal System (HBS) is a potential, near-term, low-cost space fission power and/or propulsion system. Both systems will be composed of independent modules, and all components operate within the existing databases. The HPS and HBS have relatively few system integration issues; thus, the successful development of a module is a significant step toward verifying system feasibility and performance estimates. A prototypic HPS module is being fabricated, and testing is scheduled to begin in November 1996. A successful test will provide high confidence that the HPS can achieve its predicted performance

  19. Nuclear power programs in the world's developed and developing countries

    International Nuclear Information System (INIS)

    Czibolya, L.

    1983-01-01

    The significance of nuclear power in the world's energy balance related to fossile energy sources is discussed. The general trend of declination of the national power programs could be observed from the seventies as a result of the oil crisis and the economic recession. The main features of the national energy programs including the ratio of the different energy sources in the power supply, the distribution of power production among the different types of nuclear reactors, the time schedules of the national nuclear power programs are reviewed through the examples of some developed and developing countries: USA, FRG, Canada, Japan, France, Sweden, the Soviet Union, Czechoslovakia, Bulgaria, Hungary, Romania, India, and the Republic of Korea. (V.N.)

  20. Strategic alliance and private sector investment options in the Nigerian power industry

    International Nuclear Information System (INIS)

    Ibrahim, H.

    1998-01-01

    This paper discusses the issue of energy and mineral resources and the effect of appropriate strategic partnerships necessary for its development. The energy related minerals of interest are coal, tar-sand (bitumen), uranium and barytes/bentonite. The strategic development of the minerals and the impact on the Nigeria economy over the years are reviewed. Present status of these minerals show that harnessing them could have serious environmental consequences previously neglected. However, control of emissions for example from coal-fired power status add to the financial cost of the coal-fired power

  1. Economic comparison of MHD equilibrium options for advanced steady state tokamak power plants

    International Nuclear Information System (INIS)

    Ehst, D.A.; Kessel, C.E.; Jardin, S.C.; Krakowski, R.A.; Bathke, C.G.; Mau, T.K.; Najmabadi, F.

    1998-01-01

    Progress in theory and in tokamak experiments leads to questions of the optimal development path for commercial tokamak power plants. The economic prospects of future designs are compared for several tokamak operating modes: (high poloidal beta) first stability, second stability and reverse shear. Using a simplified economic model and selecting uniform engineering performance parameters, this comparison emphasizes the different physics characteristics - stability and non- inductive current drive - of the various equilibria. The reverse shear mode of operation is shown to offer the lowest cost of electricity for future power plants. (author)

  2. The program of reactors and nuclear power plants

    International Nuclear Information System (INIS)

    Calabrese, Carlos R.

    2001-01-01

    Into de framework of the program of research reactors and nuclear power plants, the operating Argentine reactors are described. The uses of the research reactors in Argentina are summarized. The reactors installed by Argentina in other countries (Peru, Algeria, Egypt) are briefly described. The CAREM project for the design and construction of an innovator small power reactor (27 MWe) is also described in some detail. The next biennial research and development program for reactor is briefly outlined

  3. A scenario analysis of investment options for the Cuban power sector using the MARKAL model

    International Nuclear Information System (INIS)

    Wright, Evelyn L.; Belt, Juan A.B.; Chambers, Adam; Delaquil, Pat; Goldstein, Gary

    2010-01-01

    The Cuban power sector faces a need for extensive investment in new generating capacity, under a large number of uncertainties regarding future conditions, including: rate of demand growth, fluctuations in fuel prices, access to imported fuel, and access to investment capital for construction of new power plants and development of fuel import infrastructure. To identify cost effective investment strategies under these uncertainties, a supply and power sector MARKAL model was assembled, following an extensive review of available data on the Cuban power system and resource potentials. Two scenarios were assessed, a business-as-usual (BAU) scenario assuming continued moderate electricity load growth and domestic fuel production growth, and a high growth (HI) scenario assuming rapid electricity demand growth, rapid increase in domestic fuel production, and a transition to market pricing of electricity. Within these two scenarios sets, sensitivity analyses were conducted on a number of variables. The implications of least-cost investment strategies for new capacity builds, investment spending requirements, electricity prices, fuel expenditures, and carbon dioxide emissions for each scenario were assessed. Natural gas was found to be the cost effective fuel for new generation across both scenarios and most sensitivity cases, suggesting that access to natural gas, through increased domestic production and LNG import, is a clear priority for further analysis in the Cuban context.

  4. Comparative Analysis of Power Plant Options for Enhanced Geothermal Systems (EGS

    Directory of Open Access Journals (Sweden)

    Mengying Li

    2014-12-01

    Full Text Available Enhanced geothermal systems (EGS extract heat from underground hot dry rock (HDR by first fracturing the HDR and then circulating a geofluid (typically water into it and bringing the heated geofluid to a power plant to generate electricity. This study focuses on analysis, examination, and comparison of leading geothermal power plant configurations with a geofluid temperature from 200 to 800 °C, and also analyzes the embodied energy of EGS surface power plants. The power generation analysis is focused on flash type cycles for using subcritical geofluid (<374 °C and expansion type cycles for using supercritical geofluid (>374 °C. Key findings of this study include: (i double-flash plants have 24.3%–29.0% higher geofluid effectiveness than single-flash ones, and 3%–10% lower specific embodied energy; (ii the expansion type plants have geofluid effectiveness > 750 kJ/kg, significantly higher than flash type plants (geofluid effectiveness < 300 kJ/kg and the specific embodied energy is lower; (iii to increase the turbine outlet vapor fraction from 0.75 to 0.90, we include superheating by geofluid but that reduces the geofluid effectiveness by 28.3%; (iv for geofluid temperatures above 650 °C, double-expansion plants have a 2% higher geofluid effectiveness and 5%–8% lower specific embodied energy than single-expansion ones.

  5. Liquid Wall Options for Tritium-Lean Fast Ignition Inertial Fusion Energy Power Plants

    International Nuclear Information System (INIS)

    Reyes, S.; Schmitt, R.C.; Latkowski, J.F.; Durbin, S.G.' Sanz, J.

    2002-01-01

    In an inertial fusion energy (FE) thick-liquid chamber design such as HYLEE-II, a molten-salt is used to attenuate neutrons and protect the chamber structures from radiation damage. In the case of a fast ignition inertial fusion system, advanced targets have been proposed that may be self-sufficient in terms of tritium breeding (i.e., the amount of tritium bred in target exceeds the amount burned). This aspect allows for greater freedom when selecting a liquid for the protective blanket, given that lithium-bearing compounds are no longer required. The present work assesses the characteristics of many single, binary, and ternary molten-salts using the NIST Properties of Molten Salts Database. As an initial screening, salts were evaluated for their safety and environmental (S and E) characteristics, which included an assessment of waste disposal rating, contact dose, and radioactive afterheat. Salts that passed the S and E criteria were then evaluated for required pumping power. The pumping power was calculated using three components: velocity head losses, frictional losses, and lifting power. The results of the assessment are used to identify those molten-salts that are suitable for potential liquid-chamber fast-ignition IFE concepts, from both the S and E and pumping power perspective. Recommendations for further analysis are also made

  6. A scenario analysis of investment options for the Cuban power sector using the MARKAL model

    Energy Technology Data Exchange (ETDEWEB)

    Wright, Evelyn L.; Chambers, Adam; Delaquil, Pat; Goldstein, Gary [International Resources Group, 1211 Connecticut Avenue, NW, Suite 700, Washington, DC 20036 (United States); Belt, Juan A.B. [US Agency for International Development, 1300 Pennsylvania Avenue, NW, Washington, DC 20523-3800 (United States)

    2010-07-15

    The Cuban power sector faces a need for extensive investment in new generating capacity, under a large number of uncertainties regarding future conditions, including: rate of demand growth, fluctuations in fuel prices, access to imported fuel, and access to investment capital for construction of new power plants and development of fuel import infrastructure. To identify cost effective investment strategies under these uncertainties, a supply and power sector MARKAL model was assembled, following an extensive review of available data on the Cuban power system and resource potentials. Two scenarios were assessed, a business-as-usual (BAU) scenario assuming continued moderate electricity load growth and domestic fuel production growth, and a high growth (HI) scenario assuming rapid electricity demand growth, rapid increase in domestic fuel production, and a transition to market pricing of electricity. Within these two scenarios sets, sensitivity analyses were conducted on a number of variables. The implications of least-cost investment strategies for new capacity builds, investment spending requirements, electricity prices, fuel expenditures, and carbon dioxide emissions for each scenario were assessed. Natural gas was found to be the cost effective fuel for new generation across both scenarios and most sensitivity cases, suggesting that access to natural gas, through increased domestic production and LNG import, is a clear priority for further analysis in the Cuban context. (author)

  7. Longer operating times of nuclear power plants. Options for compensating public utility advantages

    International Nuclear Information System (INIS)

    Bode, Sven; Kondziella, Hendrik; Bruckner, Thomas

    2010-01-01

    The current German government of CDU/CSU and FDP intends to prolong the operating time of existing nuclear power plants in Germany. The advantages resulting for public utilities are to be compensated. The authors discuss how compensation may be achieved and outline the available instruments. (orig.)

  8. Exploring Mobility Options for Children with Physical Disabilities: A Focus on Powered Mobility

    Science.gov (United States)

    Wiart, Lesley

    2011-01-01

    The study by Tefft et al. (2011, in this issue) is one of the few studies that have explored the impact of pediatric powered mobility on families. The parents who participated in their study reported increased satisfaction with their children's social and play skills, ability to move independently, sleeping patterns, and public perception of their…

  9. An Assessment of the Economics of Future Electric Power Generation Options and the Implications for Fusion

    International Nuclear Information System (INIS)

    Delene, Jerry G.; Sheffield, John; Williams, Kent A.; Reid, R. Lowell; Hadley, Stan

    2001-01-01

    This study examines the potential range of electric power costs for some major alternatives to fusion electric power generation when it is ultimately deployed in the middle of the 21st century and, thus, offers a perspective on the cost levels that fusion must achieve to be competitive. The alternative technologies include coal burning, coal gasification, natural gas, nuclear fission, and renewable energy. The cost of electricity (COE) from the alternatives to fusion should be in a 30 to 53 mills/kW.h (1999 dollars) range if carbon sequestration is not needed, 30 to 61 mills/kW.h if sequestration is required, or as high as 83 mills/kW.h for the worst-case scenario for cost uncertainty. The reference COE range for fusion was estimated at 65 to 102 mills/kW.h for 1- to 1.3-GW(electric) scale power plants, based on the tokamak concept. Tokamak fusion costs will have to be reduced and/or cost-effective alternative nontokamak concepts devised before fusion will be competitive with the alternatives for the future production of electricity. Fortunately, there are routes to achieve this goal. Recent results from fusion experiments and developments in technology and engineering solutions indicate that lower cost fusion power plants are possible at the 1-GW(electric) level. Another general route for fusion to reduce costs is to go to large plant sizes [multigigawatts (electric)

  10. Options for greenhouse emission reduction by using a module for combined heat and power generation

    International Nuclear Information System (INIS)

    Stankov, Nikola; Ivanov, Bozhidar

    2009-01-01

    This report contains example of CO 2 emission reduction assessment when using module for combined heat and power generation that is fueled by natural gas. Environmental benefits are related to the type of fuel that is used and the increased efficiency of the combined production process. Choosing of the CHP unit and the assessment scheme are also presented

  11. Potential impact of (CET) carbon emissions trading on China's power sector: A perspective from different allowance allocation options

    International Nuclear Information System (INIS)

    Cong, Rong-Gang; Wei, Yi-Ming

    2010-01-01

    In Copenhagen climate conference China government promised that China would cut down carbon intensity 40-45% from 2005 by 2020. CET (carbon emissions trading) is an effective tool to reduce emissions. But because CET is not fully implemented in China up to now, how to design it and its potential impact are unknown to us. This paper studies the potential impact of introduction of CET on China's power sector and discusses the impact of different allocation options of allowances. Agent-based modeling is one appealing new methodology that has the potential to overcome some shortcomings of traditional methods. We establish an agent-based model, CETICEM (CET Introduced China Electricity Market), of introduction of CET to China. In CETICEM, six types of agents and two markets are modeled. We find that: (1) CET internalizes environment cost; increases the average electricity price by 12%; and transfers carbon price volatility to the electricity market, increasing electricity price volatility by 4%. (2) CET influences the relative cost of different power generation technologies through the carbon price, significantly increasing the proportion of environmentally friendly technologies; expensive solar power generation in particular develops significantly, with final proportion increasing by 14%. (3) Emission-based allocation brings about both higher electricity and carbon prices than by output-based allocation which encourages producers to be environmentally friendly. Therefore, output-based allocation would be more conducive to reducing emissions in the Chinese power sector. (author)

  12. Mixed Waste Management Options: 1995 Update. National Low-Level Waste Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Kirner, N.; Kelly, J.; Faison, G.; Johnson, D. [Foster Wheeler Environmental Corp. (United States)

    1995-05-01

    In the original mixed Waste Management Options (DOE/LLW-134) issued in December 1991, the question was posed, ``Can mixed waste be managed out of existence?`` That study found that most, but not all, of the Nation`s mixed waste can theoretically be managed out of existence. Four years later, the Nation is still faced with a lack of disposal options for commercially generated mixed waste. However, since publication of the original Mixed Waste Management Options report in 1991, limited disposal capacity and new technologies to treat mixed waste have become available. A more detailed estimate of the Nation`s mixed waste also became available when the US Environmental Protection Agency (EPA) and the US Nuclear Regulatory Commission (NRC) published their comprehensive assessment, titled National Profile on Commercially Generated Low-Level Radioactive Mixed Waste (National Profile). These advancements in our knowledge about mixed waste inventories and generation, coupled with greater treatment and disposal options, lead to a more applied question posed for this updated report: ``Which mixed waste has no treatment option?`` Beyond estimating the volume of mixed waste requiring jointly regulated disposal, this report also provides a general background on the Atomic Energy Act (AEA) and the Resource Conservation and Recovery Act (RCRA). It also presents a methodical approach for generators to use when deciding how to manage their mixed waste. The volume of mixed waste that may require land disposal in a jointly regulated facility each year was estimated through the application of this methodology.

  13. Mixed Waste Management Options: 1995 Update. National Low-Level Waste Management Program

    International Nuclear Information System (INIS)

    Kirner, N.; Kelly, J.; Faison, G.; Johnson, D.

    1995-05-01

    In the original mixed Waste Management Options (DOE/LLW-134) issued in December 1991, the question was posed, ''Can mixed waste be managed out of existence?'' That study found that most, but not all, of the Nation's mixed waste can theoretically be managed out of existence. Four years later, the Nation is still faced with a lack of disposal options for commercially generated mixed waste. However, since publication of the original Mixed Waste Management Options report in 1991, limited disposal capacity and new technologies to treat mixed waste have become available. A more detailed estimate of the Nation's mixed waste also became available when the US Environmental Protection Agency (EPA) and the US Nuclear Regulatory Commission (NRC) published their comprehensive assessment, titled National Profile on Commercially Generated Low-Level Radioactive Mixed Waste (National Profile). These advancements in our knowledge about mixed waste inventories and generation, coupled with greater treatment and disposal options, lead to a more applied question posed for this updated report: ''Which mixed waste has no treatment option?'' Beyond estimating the volume of mixed waste requiring jointly regulated disposal, this report also provides a general background on the Atomic Energy Act (AEA) and the Resource Conservation and Recovery Act (RCRA). It also presents a methodical approach for generators to use when deciding how to manage their mixed waste. The volume of mixed waste that may require land disposal in a jointly regulated facility each year was estimated through the application of this methodology

  14. DYNAMIC PROGRAMMING – EFFICIENT TOOL FOR POWER SYSTEM EXPANSION PLANNING

    Directory of Open Access Journals (Sweden)

    SIMO A.

    2015-03-01

    Full Text Available The paper isfocusing on dynamic programming use for power system expansion planning (EP – transmission network (TNEP and distribution network (DNEP. The EP problem has been approached from the retrospective and prospective point of view. To achieve this goal, the authors are developing two software-tools in Matlab environment. Two techniques have been tackled: particle swarm optimization (PSO and genetic algorithms (GA. The case study refers to Test 25 buses test power system developed within the Power Systems Department.

  15. Structural optimization of static power control programs of nuclear power plants with WWER-1000

    International Nuclear Information System (INIS)

    Kokol, E.O.

    2015-01-01

    The question of possibility the power control programs switching for WWER-1000 is considered. The aim of this research is to determine the best program for the power control of nuclear reactor under cyclic diurnal behavior of electrical generation, as well as the switching implementation. The considered problem of finding the best control program refers to the multicriteria optimization class of problems. Operation of the nuclear power generation system simulated using the following power control programs: with constant average temperature of transfer fluid, with constant pressure in the reactor secondary circuit, with constant temperature in input of the nuclear reactor. The target function was proposed. It consists of three normalized criteria: the burn up fraction, the damage level of fuel rod array shells, as well as changes in the power values. When simulation of the nuclear power generation system operation within the life was done, the values of the selected criteria were obtained and inserted in the target function. The minimum of three values of the target function depending on the control program at current time defined the criterion of switching of considered static power control programs for nuclear power generation system

  16. A thermonuclear fusion power program for Israel

    International Nuclear Information System (INIS)

    Friedman, Bruce

    1985-01-01

    Although lacking in financial and physical resources, Israel has a large base of scientific and technological talent that can be organized for the purpose of producing commercial fusion power reactors, thus allowing Israel to attain energy independence and acquiring a monetary inflow through royalties and reactor export. The limited partnership would be suitable for financing a significant portion of the project. Economic feasibility can be estimated through the use of one or more of the approaches supplied by the calculus of variations, cardinal utility theory, catastrophe theory, and noncooperative game theory. (author)

  17. New directions in fusion machines: report on the MFAC Panel X on high power density options

    International Nuclear Information System (INIS)

    Linford, R.K.

    1985-01-01

    The high cost of fusion is motivating a shift in research interest toward smaller, lower-cost systems. Panel X of the Magnetic Fusion Advisory Committee (MFAC) was charged to assess the potential benefits and problems associated with small, high-power-density approaches to fusion. The Panel identified figures of merit which are useful in evaluating various approaches to reduce the development costs and capital costs of fusion systems. As a result of their deliberations, the Panel recommended that ''...increased emphasis should be given to improving the mass power density of fusion systems, aiming at a minimum target of 100 kWe/tonne'', and that ''Increased emphasis should be given to concepts that offer the potential to reduce substantially the cost of development steps in physics and technology.''

  18. New directions in fusion machines: report on the MFAC Panel X on high power density options

    Energy Technology Data Exchange (ETDEWEB)

    Linford, R.K.

    1985-01-01

    The high cost of fusion is motivating a shift in research interest toward smaller, lower-cost systems. Panel X of the Magnetic Fusion Advisory Committee (MFAC) was charged to assess the potential benefits and problems associated with small, high-power-density approaches to fusion. The Panel identified figures of merit which are useful in evaluating various approaches to reduce the development costs and capital costs of fusion systems. As a result of their deliberations, the Panel recommended that ''...increased emphasis should be given to improving the mass power density of fusion systems, aiming at a minimum target of 100 kWe/tonne'', and that ''Increased emphasis should be given to concepts that offer the potential to reduce substantially the cost of development steps in physics and technology.''

  19. Ownership options, financing structures, and regulatory considerations affecting independent power production projects

    International Nuclear Information System (INIS)

    Knapp, G.M.

    1990-01-01

    In this paper is a framework for analysis of the legal, financing, and policy differences between independent power production projects (IPPs) and projects with qualifying facility status (QFs) under the Public Utility Regulatory Policies Act (PURPA). At a basic level, there is no fundamental difference in types of ownership and financing structures available to IPPs and QFS. The key consideration, though, is the regulatory and legal implications to project participants. Significant issues arise for equity participants, lenders, developers, and project operators that are considering IPP projects. Of course, many of these same issues apply to certain types of QF projects that are not fully exempt from the Public Utility Holding Company Act (PUHCA) and the Federal Power Act (FPA)

  20. A Comparison of Coolant Options for Brayton Power Conversion Heat Rejection Systems

    International Nuclear Information System (INIS)

    Siamidis, John; Mason, Lee

    2006-01-01

    This paper describes potential heat rejection design concepts for Brayton power conversion systems. Brayton conversion systems are currently under study by NASA for Nuclear Electric Propulsion (NEP) and surface power applications. The Brayton Heat Rejection Subsystem (HRS) must dissipate waste heat generated by the power conversion system due to inefficiencies in the thermal-to-electric conversion process. Sodium potassium (NaK) and H2O are two coolant working fluids that have been investigated in the design of a pumped loop and heat pipe space HRS. In general NaK systems are high temperature (300 to 1000 K) low pressure systems, and H2O systems are low temperature (300 to 600 K) high pressure systems. NaK is an alkali metal with health and safety hazards that require special handling procedures. On the other hand, H2O is a common fluid, with no health hazards and no special handling procedures. This paper compares NaK and H2O for the HRS pumped loop coolant working fluid. A detailed excel analytical model, HRS O pt, was developed to evaluate the various HRS design parameters. It is capable of analyzing NaK or H2O coolant, parallel or series flow configurations, and numerous combinations of other key parameters (heat pipe spacing, diameter and radial flux, radiator facesheet thickness, fluid duct system pressure drop, system rejected power, etc.) of the HRS. This paper compares NaK against water for the HRS coolant working fluid with respect to the relative mass, performance, design and implementation issues between the two fluids

  1. Pulse Power--A Heart Physiology Program for Children.

    Science.gov (United States)

    Hinson, Curt

    1994-01-01

    Primary grade students at a Delaware elementary school currently participate in the Pulse Power heart physiology program. Students receive mastery instruction and use heart monitors to exercise performance throughout the 6-phase program. Data from homework and from the heart monitors identify student progress, knowledge, and cardiovascular…

  2. An Assessment of the Economics of Future Electric Power Generation Options and the Implications for Fusion

    International Nuclear Information System (INIS)

    Delene, J.G.; Hadley, S.; Reid, R.L.; Sheffield, J.; Williams, K.A.

    1999-01-01

    This study examines the potential range of electric power costs for some major alternatives to fusion electric power generation when it is ultimately deployed in the middle of the 21st century and, thus, offers a perspective on the cost levels that fusion must achieve to be competitive. The alternative technologies include coal burning, coal gasification, natural gas, nuclear fission, and renewable energy. The cost of electricity (COE) from the alternatives to fusion should remain in the 30-50 mils/kWh (1999 dollars) range of today in carbon sequestration is not needed, 30-60 mils/kWh if sequestration is required, or as high as 75 mils/kWh for the worst-case scenario for cost uncertainty. The reference COE range for fusion was estimated at 70-100 nmils/kWh for 1- to 1.3-GW(e) scale power plants. Fusion costs will have to be reduced and/or alternative concepts derived before fusion will be competitive with the alternatives for the future production of electricity. Fortunately, there are routes to achieve this goal

  3. The Programming Power of the Placenta

    Science.gov (United States)

    Sferruzzi-Perri, Amanda N.; Camm, Emily J.

    2016-01-01

    Size at birth is a critical determinant of life expectancy, and is dependent primarily on the placental supply of nutrients. However, the placenta is not just a passive organ for the materno-fetal transfer of nutrients and oxygen. Studies show that the placenta can adapt morphologically and functionally to optimize substrate supply, and thus fetal growth, under adverse intrauterine conditions. These adaptations help meet the fetal drive for growth, and their effectiveness will determine the amount and relative proportions of specific metabolic substrates supplied to the fetus at different stages of development. This flow of nutrients will ultimately program physiological systems at the gene, cell, tissue, organ, and system levels, and inadequacies can cause permanent structural and functional changes that lead to overt disease, particularly with increasing age. This review examines the environmental regulation of the placental phenotype with particular emphasis on the impact of maternal nutritional challenges and oxygen scarcity in mice, rats and guinea pigs. It also focuses on the effects of such conditions on fetal growth and the developmental programming of disease postnatally. A challenge for future research is to link placental structure and function with clinical phenotypes in the offspring. PMID:27014074

  4. Advanced power electronics and electric machinery program

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2007-12-01

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as "FreedomCAR" (derived from "Freedom" and "Cooperative Automotive Research"), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieving the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001.

  5. Comparative assessment of nuclear power and other options: the DECADES project

    International Nuclear Information System (INIS)

    Vladu, I. F.

    1996-01-01

    This paper presents the results obtained in constructing and implementing a general framework for performing comprehensive assessment within the inter-agency joint project on Databases and Methodologies for Comparative Assessment of Different Energy Sources for electricity generation. The project was established in 1992 by nine international organizations. A short description of the DECADES project objectives, structure and main components is given. The technology inventory databases, which are a major part of the project, address all the levels of different energy chains, from fuel extraction through electricity generation to waste disposal. These databases support comparative assessment in the power sector, by providing generic information as well as country or region specific information on existing technologies and on those expected to enter the market in the next two to three decades. The paper further touches on the types of assessment that can be carried out using the methodology and databases developed. It point out in this regard the possibilities and limitations of comparative assessments performed at the level of power plant, full electricity supply chain and country or region electricity generation system. Illustrative results are presented for comparisons performed at all these levels. Case studies and workshops and seminars are one of the main activities carried out until now for validation and dissemination of the DECADES Computer Tools. In those studies where it was considered, nuclear power appeared to be cost effective for reducing emissions of CO 2 , SO 2 , NO x and other greenhouse gases. Finally, the paper briefly introduce the activities envisaged for the phase II of the DECADES project which will focus on disseminating the current computer tools, providing training in the use of the tools, and supporting country studies, and on development of new analytical capabilities. The paper concludes with some findings and remarks pointing out the

  6. Early site reviews for nuclear power facilities: procedures and possible technical review options. Draft

    International Nuclear Information System (INIS)

    1978-02-01

    The document provides guidance for utility companies, State and other governmental agencies, and others who may request or may wish to participate in an early review of site suitability issues related to a site proposed for a nuclear power or test reactor. Although the emphasis of this document is on a nuclear electric generating station, the guidance provided can be used for a test reactor or other kinds of reactors. The procedures to be followed by applicants for construction permits and by others are described and the possible significant areas of technical review are delineated

  7. Genesis of the Brazilian nuclear power plants program

    International Nuclear Information System (INIS)

    Syllus, G.; Lepecki, W.

    1996-01-01

    The genesis of the Brazilian Nuclear Power Program is described by the authors - who participated in the events - from the beginning of the sixties, until the definition and the start of the implementation in 1975 of the Reference Nuclear Power Program. A description is made of the main events, studies and decisions that contributed to the evolution of the Program: the GTRP (Nuclear Power Plant Working Group); the Thorium Group; the Lane Group; the decision about Angra 1; CNEN's analyses about the reactor line and, finally, the creation of CBTN (Nuclear Technology Brazilian Company), which elaborated the studies that resulted in the final definition of the Program and led to the Brazilian German Agreement and the establishment of NUCLEBRAS. (author)

  8. Bibliography of the Maryland Power Plant Research Program, fourteenth edition

    International Nuclear Information System (INIS)

    McLean, R.I.

    1993-02-01

    The Power Plant Siting Act of 1971 (Sec. 3-303) established the Power Plant Research Program to ensure that demands for electric power would be met in a timely manner at a reasonable cost while assuring that the associated environmental impact would be acceptable. The scope of the Program extends to estimating the impact of proposed new generating facilities, evaluating the acceptability of proposed transmission line routes, assessing the impact of existing generation facilities, and investigating generic issues related to power plant site evaluation and associated environmental and land use considerations. The bibliography is a compilation of all the studies performed for and/or by the Power Plant and Environmental Review Division since its inception

  9. Bibliography of the Maryland Power Plant Research Program, Thirteenth Edition

    International Nuclear Information System (INIS)

    McLean, R.I.

    1992-02-01

    The Power Plant Siting Act of 1971 (Sec. 3-303) established the Power Plant Research Program to insure that demands for electric power would be met in a timely manner at a reasonable cost while assuring that the associated environmental impact would be acceptable. The scope of the Program extends to estimating the impact of proposed new generating facilities, evaluating the acceptability of proposed transmission line routes, assessing the impact of existing generation facilities, and investigating generic issues related to power plant site evaluation and associated environmental and land use considerations. The bibliography is a compilation of all the studies performed for and or by the Power Plant and Environmental Review Division since its inception. Reports published by the Division considered to be of general interest are routinely made available through the National Technical Information Service. Those reports so registered may be identified by the NTIS accession number immediately following the citation in the bibliography

  10. Energy source options for the generation of electrical power in Taiwan

    International Nuclear Information System (INIS)

    Chang, Ching-Chih; Wang, Chih-Min

    2014-01-01

    Highlights: • Analyses of CO 2 emissions and cost in different generation energy source. • Solar, geothermal and wave energy are opportunity for reducing CO 2 emissions. • Expanding renewable energy support electrical industry sustainable development. - Abstract: This study sought to evaluate newly introduced energy policies with regard to economic development and environmental preservation by analyzing carbon dioxide emissions and the costs associated with various electrical power generation schemes. Nonlinear regression was used to measure the efficiency of technology aimed at CO 2 emission reduction and the Morris method was employed for sensitivity analysis. Our results indicate that new Taiwanese energy policies represent the lowest possible cost and the lowest possible CO 2 emissions per kW h currently possible. However, total CO 2 emissions under this plan fail to meet emissions targets established in 2000. This paper outlines a long-term plan for the transformation of the Taiwanese power generation industry from a major contributor of pollution into a largely green entity through the replacement of coal with renewable energy sources

  11. PV–wind hybrid power option for a low wind topography

    International Nuclear Information System (INIS)

    Bhattacharjee, Subhadeep; Acharya, Shantanu

    2015-01-01

    Highlights: • Optimally harness the wind energy by unification of solar resource. • Analysis of PV–wind hybrid system with tangible experience. • Cost of generation and renewable fraction are $0.488/kWh and 0.90 respectively. • Maximum wind penetration is observed to be 32.75% with installed PV–wind system. • Indicative annual grid electricity conservation is 90%. - Abstract: Solar and wind are clean energy sources with enormous potential to alleviate grid dependence. The paper aims to optimally harness the wind resource with the support of solar energy through hybrid technology for a north-east Indian state Tripura (low wind topography). Techno-economic analysis of a photovoltaic (PV)-wind hybrid simulation model has been performed for small scale application in an educational building. The study also evaluates the tangible performance of a similar plant in practical condition of the site. It has emerged from the study that major energy generation is turning out from PV segment which is promising almost all round the year. Nonetheless, a considerable amount of wind power is found to be generated during half of the year when average PV power production is comparatively less. The cost of electricity from the simulation model is found to be $0.488/kWh while renewable fraction in the total electricity share is obtained to be 0.90. From the actual performance of the plant, maximum wind penetration is observed to be 32.75%

  12. Neutronic performance issues of the breeding blanket options for the European DEMO fusion power plant

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, U., E-mail: ulrich.fischer@kit.edu [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Bachmann, C. [EUROfusion—Programme Management Unit, Boltzmannstr. 2, 85748 Garching (Germany); Jaboulay, J.-C. [CEA-Saclay, DEN, DM2S, SERMA, LPEC, 91191 Gif-sur-Yvette (France); Moro, F. [ENEA, Dipartimento Fusione e tecnologie per la Sicurezza Nucleare, Via E. Fermi 45, 00044 Frascati, Rome (Italy); Palermo, I. [Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (CIEMAT), Madrid (Spain); Pereslavtsev, P. [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Villari, R. [ENEA, Dipartimento Fusione e tecnologie per la Sicurezza Nucleare, Via E. Fermi 45, 00044 Frascati, Rome (Italy)

    2016-11-01

    Highlights: • Breeder blanket concepts for DEMO—design features. • Neutronic characteristics of breeder blankets. • Evaluation of Tritium breeding potential. • Evaluation of shielding performance. - Abstract: This paper presents nuclear performance issues of the HCPB, HCLL, DCLL and WCLL breeder blankets, which are under development within the PPPT (Power Plant Physics and Technology) programme of EUROfusion, with the objective to assess the potential and suitability of the blankets for the application to DEMO. The assessment is based on the initial design versions of the blankets developed in 2014. The Tritium breeding potential is considered sufficient for all breeder blankets although the initial design versions of the HCPB, HCLL and DCLL blankets were shown to require further design improvements. Suitable measures have been proposed and proven to be sufficient to achieve the required Tritium Breeding Ratio (TBR) ≥ 1.10. The shielding performance was shown to be sufficient to protect the super-conducting toroidal field coil provided that efficient shielding material mixtures including WC or borated water are utilized. The WCLL blanket does not require the use of such shielding materials due to a very compact blanket support structure/manifold configuration which yet requires design verification. The vacuum vessel can be safely operated over the full anticipated DEMO lifetime of 6 full power years for all blanket concepts considered.

  13. Nuclear power and radioactive waste: a sub-seabed disposal option

    International Nuclear Information System (INIS)

    Deese, D.A.

    1978-01-01

    The radioactive waste disposal programs of most countries are still focused on investigation of land-based geologic formations as possible containment media for radioactive wastes. Important discoveries in geological oceanography and amazing advances in ocean engineering over the past decade have, however, led several countries to investigate another promising possibility for geologic disposal of radioactive waste--isolation within the deep seabed or sub-seabed disposal. Beyond the various technical advantages and disadvantages involved, use of the international seabed for radioactive waste disposal raises a multitude of social, economic, political, legal, institutional, and ethical issues. These issues are analyzed in this volume

  14. Medium-Power Lead-Alloy Fast Reactor Balance-of-Plant Options

    International Nuclear Information System (INIS)

    Dostal, Vaclav; Hejzlar, Pavel; Todreas, Neil E.; Buongiorno, Jacopo

    2004-01-01

    Proper selection of the power conversion cycle is a very important step in the design of a nuclear reactor. Due to the higher core outlet temperature (∼550 deg. C) compared to that of light water reactors (∼300 deg. C), a wide portfolio of power cycles is available for the lead alloy fast reactor (LFR). Comparison of the following cycles for the LFR was performed: superheated steam (direct and indirect), supercritical steam, helium Brayton, and supercritical CO 2 (S-CO 2 ) recompression. Heat transfer from primary to secondary coolant was first analyzed and then the steam generators or heat exchangers were designed. The direct generation of steam in the lead alloy coolant was also evaluated. The resulting temperatures of the secondary fluids are in the range of 530-545 deg. C, dictated by the fixed space available for the heat exchangers in the reactor vessel. For the direct steam generation situation, the temperature is 312 deg. C. Optimization of each power cycle was carried out, yielding net plant efficiency of around 40% for the superheated steam cycle while the supercritical steam and S-CO 2 cycles achieved net plant efficiency of 41%. The cycles were then compared based on their net plant efficiency and potential for low capital cost. The superheated steam cycle is a very good candidate cycle given its reasonably high net plant efficiency and ease of implementation based on the extensive knowledge and operating experience with this cycle. Although the supercritical steam cycle net plant efficiency is slightly better than that of the superheated steam cycle, its high complexity and high pressure result in higher capital cost, negatively affecting plant economics. The helium Brayton cycle achieves low net plant efficiency due to the low lead alloy core outlet temperature, and therefore, even though it is a simpler cycle than the steam cycles, its performance is mediocre in this application. The prime candidate, however, appears to be the S-CO 2

  15. Nuclear Power Plant Fire Protection Research Program

    International Nuclear Information System (INIS)

    Datta, A.

    1985-07-01

    The goal is to develop test data and analytical capabilities to support the evaluation of: (1) the contribution of fires to the risk from nuclear power plants; (2) the effects of fires on control room equipment and operations; and (3) the effects of actuation of fire suppression systems on safety equipment. A range of fire sources will be characterized with respect to their energy and mass evolution, including smoke, corrosion products, and electrically conductive products of combustion. An analytical method for determining the environment resulting from fire will be developed. This method will account for the source characteristics, the suppression action following detection of the fire, and certain parameters specific to the plant enclosure in which the fire originates, such as the geometry of the enclosure and the ventilation rate. The developing local environment in the vicinity of safety-related equipment will be expressed in terms of temperatures, temperature rise rates, heat fluxes, and moisture and certain species content. The response of certain safe shutdown equipment and components to the environmental conditions will be studied. The objective will be to determine the limits of environmental conditions that a component may be exposed to without impairment of its ability to function

  16. Review of world nuclear power programs

    International Nuclear Information System (INIS)

    Rippon, S.

    1978-01-01

    Political, economic and environmental decisions are still affecting the growth of nuclear power generation throughout the world, but there are signs that proven past performance and increasing prices of energy from conventional sources are becoming overriding factors. In the USA, some uncertainty has been created by the moratorium on reprocessing enacted by the 1978 Non-Proliferation Act. The uncertainty has spread to importers of nuclear fuel and technology, but there is increasing international acceptance of the International Nuclear Fuel Cycle Evaluation. Isotope separation capacity to be installed by the US government, by the joint European organization Urenco and by the French Eurodif should ease the supply of fuel. There is little progress on waste-management policy in the USA, but in Germany a company (DWK) has been formed and a site for a rocksalt repository has been designated at Gorleben. In the UK the Windscale inquiry has a positive significance for nuclear energy generally as well as for reprocessing. An inquiry in Sweden has also come to positive conclusions. The status of nuclear energy in these and a number of other countries is discussed in terms of political and national policies. (N.D.H.)

  17. Big ambitions for small reactors as investors size up power options

    Energy Technology Data Exchange (ETDEWEB)

    Shepherd, John [nuclear24, Redditch (United Kingdom)

    2016-04-15

    Earlier this year, US nuclear developer NuScale Power completed a study for the UK's National Nuclear Laboratory (NNL) that supported the suitability of NuScale's small modular reactor (SMR) technology for the effective disposition of plutonium. The UK is a frontrunner to compete in the SMR marketplace, both in terms of technological capabilities, trade and political commitment. Industry observers are openly speculating whether SMR design and construction could start to move ahead faster than 'big and conventional' nuclear construction projects - not just in the UK but worldwide. Economies of scale could increase the attraction of SMRs to investors and the general public.

  18. New directions in fusion machines: Report on the MFAC panel X on high power density options

    International Nuclear Information System (INIS)

    Linford, R.K.

    1986-01-01

    The high cost of fusion is motivating a shift in research interest toward smaller, lower-cost systems. Panel X of the Magnetic Fusion Advisory Committee (MFAC) was charged to assess the potential benefits and problems associated with small, highpower-density approaches to fusion. The Panel identified figures of merit which are useful in evaluating various approaches to reduce the development costs and capital costs of fusion systems. As a result of their deliberations, the Panel recommended that ''...increased emphasis should be given to improving the mass power density of fusion systems, aiming at a minimum target of 100 kWe/tonne'', and that ''Increased emphasis should be given to concepts that offer the potential to reduce4 substantially the cost of development steps in physics and technology.''

  19. The role of nuclear power and other options in competitive electricity market study using message model

    International Nuclear Information System (INIS)

    Scorpio Sri Herdinie and Edi Sartono

    2003-01-01

    The electricity demand in Indonesia is very high due to the National Economic Development based on industrialization and supported by a strong agriculture base. It can be noted that in the last five years, the annual electricity growth rate has been reaching around 15% per annum. Though during the economic crisis the electricity demand have time to reduction. Start early 2000s the economic growth in Indonesia will gradually increase. As a consequence, the electricity growth rate also increase in the next coming decades. MESSAGE (Model for Energy Supply Strategy Alternatives and their General Environmental Impacts) is a model designed for the optimization of energy system(i.e. energy supplies and utilization). The goal of this study is to support the national planning and decision making process in the energy and electricity sector in Indonesia with regard to the economic, health, environmental and safety aspects. The objective of this study is to analyse the role of Nuclear Power Plant in the whole energy systems by introducing the new electricity regulation and structure in the market. Seen that Nuclear Power Plant will be enter the Java Bali system in the period between 2015-2020. and will dominate the addition of capacities by the end period of study (year 2020-2025). Nuclear energy has very important long term roles in the energy scenario and it is possible to do the market competitive when the Multi buyer Multi Seller (MBMS) will be done in the system electricity in Indonesia(the government has changed the target of MBMS realization into 2007). (author)

  20. Employee Assistance Programs in the 1980s: Expanding Career Options for Counselors.

    Science.gov (United States)

    Forrest, Donald V.

    1983-01-01

    Suggests that Employee Assistance Programs (EAPS) offer new and expanded work opportunities for counselors. Reviews the history of EAPS, current philosophy and program components, and implications for counselors as EAPs move from crisis intervention toward prevention. (JAC)

  1. The nuclear option: The case for using nuclear power to combat climate change

    International Nuclear Information System (INIS)

    Stone, Robert

    2015-01-01

    In December 2015, world leaders will gather in Paris to hammer out a global treaty designed to ratchet back emissions of CO_2 into the atmosphere caused by the burning of fossil fuels. I would urge each delegate, upon checking into his or her hotel room, to step out on to the balcony, take a deep breath, look out at the lights of nuclear-powered Paris and draw inspiration for what a clean energy future might look like. Thanks to France’s decision to deploy nuclear power in a big way some 30 years ago, the country’s electric grid is now almost entirely carbon free. What’s even more remarkable is that the vast majority of that transition was carried out in just 11 years (1969–1980), using the technology of the time. France today enjoys almost zero air pollution from the production of electricity and the cheapest electricity rates in western Europe. Will the climate activists and delegates take heed of what France has accomplished and look to it as a precursor of what might be possible globally? Preliminary negotiations in Lima in late 2014 have taken nuclear energy off the agenda of the climate talks. The world’s leading environmental groups, which are largely driving the agenda, posit that nuclear energy is an unnecessary distraction on the road to a renewable energy future. In making their case they argue that humanity can reduce overall energy demand while simultaneously providing adequate energy to the 3 billion people who currently live with little or no electricity at all, and take care of the additional 3 billion people to be born between now and 2050. They argue that we are on track to being able to replace the entire existing fossil fuel infrastructure, abandon nuclear energy altogether, and meet all the world’s energy needs by using renewable energy alone. And we’ve barely begun to talk about the additional energy that will be required to electrify the world’s transportation sector and meet the growing demand for energy-intensive water

  2. The nuclear option: The case for using nuclear power to combat climate change

    International Nuclear Information System (INIS)

    Stone, Robert

    2015-01-01

    In December 2015, world leaders will gather in Paris to hammer out a global treaty designed to ratchet back emissions of CO 2 into the atmosphere caused by the burning of fossil fuels. I would urge each delegate, upon checking into his or her hotel room, to step out on to the balcony, take a deep breath, look out at the lights of nuclear-powered Paris and draw inspiration for what a clean energy future might look like. Thanks to France’s decision to deploy nuclear power in a big way some 30 years ago, the country’s electric grid is now almost entirely carbon free. What’s even more remarkable is that the vast majority of that transition was carried out in just 11 years (1969–1980), using the technology of the time. France today enjoys almost zero air pollution from the production of electricity and the cheapest electricity rates in western Europe. Will the climate activists and delegates take heed of what France has accomplished and look to it as a precursor of what might be possible globally? Preliminary negotiations in Lima in late 2014 have taken nuclear energy off the agenda of the climate talks. The world’s leading environmental groups, which are largely driving the agenda, posit that nuclear energy is an unnecessary distraction on the road to a renewable energy future. In making their case they argue that humanity can reduce overall energy demand while simultaneously providing adequate energy to the 3 billion people who currently live with little or no electricity at all, and take care of the additional 3 billion people to be born between now and 2050. They argue that we are on track to being able to replace the entire existing fossil fuel infrastructure, abandon nuclear energy altogether, and meet all the world’s energy needs by using renewable energy alone. And we’ve barely begun to talk about the additional energy that will be required to electrify the world’s transportation sector and meet the growing demand for energy-intensive water

  3. Spallator and APEX nuclear fuel cycle: a new option for nuclear power

    International Nuclear Information System (INIS)

    Steinberg, M.

    1982-01-01

    A new nuclear fuel cycle is described which provides a long term supply of nuclear fuel for the thermal LWR nuclear power reactors and eliminates the need for long-term storage of radioactive waste. Fissile fuel is produced by the Spallator which depends on the production of spallation neutrons by the interaction of high-energy (1 to 2 GeV) protons on a heavy-metal target. The neutrons are absorbed in a surrounding natural-uranium or thorium blanket in which fissile Pu-239 to U-233 is produced. Advances in linear accelerator technology makes it possible to design and construct a high-beam-current continuous-wave proton linac for production purposes. The target is similar to a sub-critical reactor and produces heat which is converted to electricity for supplying the linac. The Spallator is a self-sufficient fuel producer, which can compete with the fast breeder. The APEX fuel cycle depends on recycling the transuranics and long-lived fission products while extracting the stable and short-lived fission products when reprocessing the fuel. Transmutation and decay within the fuel cycle and decay of short-lived fission products external to the fuel cycle eliminates the need for long-term geological age shortage of fission-product waste

  4. Spallator and APEX nuclear fuel cycle: a new option for nuclear power

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, M.

    1982-01-01

    A new nuclear fuel cycle is described which provides a long term supply of nuclear fuel for the thermal LWR nuclear power reactors and eliminates the need for long-term storage of radioactive waste. Fissile fuel is produced by the Spallator which depends on the production of spallation neutrons by the interaction of high-energy (1 to 2 GeV) protons on a heavy-metal target. The neutrons are absorbed in a surrounding natural-uranium or thorium blanket in which fissile Pu-239 to U-233 is produced. Advances in linear accelerator technology makes it possible to design and construct a high-beam-current continuous-wave proton linac for production purposes. The target is similar to a sub-critical reactor and produces heat which is converted to electricity for supplying the linac. The Spallator is a self-sufficient fuel producer, which can compete with the fast breeder. The APEX fuel cycle depends on recycling the transuranics and long-lived fission products while extracting the stable and short-lived fission products when reprocessing the fuel. Transmutation and decay within the fuel cycle and decay of short-lived fission products external to the fuel cycle eliminates the need for long-term geological age shortage of fission-product waste.

  5. Non-power application as an entry point to nuclear power program

    International Nuclear Information System (INIS)

    Nahrul Khair Alang Md Rashid

    2009-01-01

    Nuclear power is usually viewed as the flagship of nuclear technology. A nuclear power plant complex, visible and prominence, is iconic of the technology. That image makes its presence common knowledge to the extent that nuclear technology is equated almost totally with nuclear power by the general public. The downside of this visibility is that it becomes easy target in public misinformation programs. The non-power applications however are not visible, and devoid of icon. The non-power applications, therefore, can grow quite smoothly, attracting only little attention in the negative and in the positive senses. According to a study conducted in the USA in 2000 and in Japan in 2002, the socio-economic impact of non-power and power applications of nuclear technology are comparable. Involvement in non-power applications can be a good grounding for moving into power applications. This paper discusses the non-power nuclear technology applications and in what manner it can serve to prepare the introduction of nuclear power program. (Author)

  6. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  7. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  8. Summary of International Waste Management Programs (LLNL Input to SNL L3 MS: System-Wide Integration and Site Selection Concepts for Future Disposition Options for HLW)

    Energy Technology Data Exchange (ETDEWEB)

    Greenberg, Harris R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blink, James A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Halsey, William G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sutton, Mark [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-08-11

    The Used Fuel Disposition Campaign (UFDC) within the Department of Energy’s Office of Nuclear Energy (DOE-NE) Fuel Cycle Technology (FCT) program has been tasked with investigating the disposal of the nation’s spent nuclear fuel (SNF) and high-level nuclear waste (HLW) for a range of potential waste forms and geologic environments. This Lessons Learned task is part of a multi-laboratory effort, with this LLNL report providing input to a Level 3 SNL milestone (System-Wide Integration and Site Selection Concepts for Future Disposition Options for HLW). The work package number is: FTLL11UF0328; the work package title is: Technical Bases / Lessons Learned; the milestone number is: M41UF032802; and the milestone title is: “LLNL Input to SNL L3 MS: System-Wide Integration and Site Selection Concepts for Future Disposition Options for HLW”. The system-wide integration effort will integrate all aspects of waste management and disposal, integrating the waste generators, interim storage, transportation, and ultimate disposal at a repository site. The review of international experience in these areas is required to support future studies that address all of these components in an integrated manner. Note that this report is a snapshot of nuclear power infrastructure and international waste management programs that is current as of August 2011, with one notable exception. No attempt has been made to discuss the currently evolving world-wide response to the tragic consequences of the earthquake and tsunami that devastated Japan on March 11, 2011, leaving more than 15,000 people dead and more than 8,000 people missing, and severely damaging the Fukushima Daiichi nuclear power complex. Continuing efforts in FY 2012 will update the data, and summarize it in an Excel spreadsheet for easy comparison and assist in the knowledge management of the study cases.

  9. Incentive policies for promoting wind power production in Brazil: Scenarios for the Alternative Energy Sources Incentive Program (PROINFA) under the New Brazilian electric power sector regulation

    International Nuclear Information System (INIS)

    Dutra, Ricardo Marques; Szklo, Alexandre Salem

    2008-01-01

    The Alternative Energy Sources Incentive Program (PROINFA) was designed in 2002 to stimulate the electricity generation from three energy sources (wind, biomass and small-scale hydro) in Brazil. The Program was divided into two phases. The first one uses feed-in tariffs for promoting the development of 3300 MW. The second one that was originally based on feed-in tariffs was modified in 2003, in order to be based on biddings for renewables. These biddings are capped to limit their impact on the final electricity tariff. Due to this bound, the highest-cost power option promoted by PROINFA (wind power generation) might have development problems. Simulating different scenarios for the biddings, it was verified that the only way to reach the original goal set by PROINFA (10% of the annual electricity consumption provided by alternative sources up to 2020) and, simultaneously, not overcome the bidding bound is to promote biomass-fired power generation alone, during the Program's second phase. However, this action contradicts one of the targets of the Program, which is to diversify the energy matrix. An alternative option could be biddings for renewables according to specific criteria (complementarities, industrial and technological development and cost), based not only on their cost-effectiveness. (author)

  10. Wind power today: 1999 Wind Energy program highlights

    Energy Technology Data Exchange (ETDEWEB)

    Weis-Taylor, Pat

    2000-04-06

    Wind Power Today is an annual publication that provides an overview for the Department of Energy's Wind Energy Program. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy for the 21st century. Content objectives include: Educate readers about the advantages and potential for widespread deployment of wind energy; explain DOE wind energy program objectives and goals; describe program accomplishments in research and application; examine the barriers to widespread deployment; describe benefits of continued research and development; facilitate technology transfer; attract cooperative wind energy projects with industry.

  11. Modeling and prioritizing demand response programs in power markets

    International Nuclear Information System (INIS)

    Aalami, H.A.; Moghaddam, M. Parsa; Yousefi, G.R.

    2010-01-01

    One of the responsibilities of power market regulator is setting rules for selecting and prioritizing demand response (DR) programs. There are many different alternatives of DR programs for improving load profile characteristics and achieving customers' satisfaction. Regulator should find the optimal solution which reflects the perspectives of each DR stakeholder. Multi Attribute Decision Making (MADM) is a proper method for handling such optimization problems. In this paper, an extended responsive load economic model is developed. The model is based on price elasticity and customer benefit function. Prioritizing of DR programs can be realized by means of Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method. Considerations of ISO/utility/customer regarding the weighting of attributes are encountered by entropy method. An Analytical Hierarchy Process (AHP) is used for selecting the most effective DR program. Numerical studies are conducted on the load curve of the Iranian power grid in 2007. (author)

  12. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  13. Wind Power Today: 2000 Wind Energy Program Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Weis-Taylor, W.

    2001-05-08

    Wind Power Today is an annual publication that provides an overview of the U.S. Department of Energy's Wind Energy Program. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describe the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry.

  14. Alberta Environment's weir safety program : options for rehabilitation to improve public safety : a case study of the Calgary weir

    Energy Technology Data Exchange (ETDEWEB)

    Blakely, D [Alberta Environment, Edmonton, AB (Canada)

    2009-07-01

    Alberta Environment Water Management Operations (WMO) owns and operates 46 dams and 800 kilometres of canals in Alberta. The WMO consists of 120 staff and several contract operators to take care of this infrastructure. Most of the infrastructure supplies water for irrigation use, which adds 5 billion dollars to the provincial economy annually. Other water uses include stock watering, domestic use, municipal use, recreational use and habitat. Alberta Environment's weir safety program was also discussed along with options for rehabilitation to improve public safety. A case study of Calgary's Weir Dam on the Bow River was highlighted. A brief history of the dam was offered and safety programs around provincially-owned weirs were discussed. Photographs were included to illustrate some of the additional safety measures at the Calgary weir, such as suspended safety buoys upstream of the boom directing paddlers to the portage trail, and signage on the river that can be activated when the boom is out. Typical river users on the Calgary Bow River and safety history at the Calgary Weir were discussed along with other topics such as the Calgary Bow River weir project criteria; project design progress; pre-feasibility options; scale modelling; final design analysis; construction funding; and proposed changes to the safety program for the new weir configuration. figs.

  15. Inpo programs for improvement of nuclear power plant operations

    International Nuclear Information System (INIS)

    Edward Moore, C.

    1989-01-01

    The talk shows how key INPO programs help foster improved nuclear power operations. The talk focuses on the results being seen from six key efforts: evaluations, training and accreditation, assistance, events analysis and information exchange, human performance and maintenance. The talk stresses that all INPO programs are geared toward enhanced performance and that progress in key performance areas since 1980 shows that INPO and U.S. industry efforts are achieving desired results

  16. Modeling on a PWR power conversion system with system program

    International Nuclear Information System (INIS)

    Gao Rui; Yang Yanhua; Lin Meng

    2007-01-01

    Based on the power conversion system of nuclear and conventional islands of Daya Bay Power Station, this paper models the thermal-hydraulic systems of primary and secondary loops for PWR by using the PWR best-estimate program-RELAP5. To simulate the full-scope power conversion system, not only the traditional basic system models of nuclear island, but also the major system models of conventional island are all considered and modeled. A comparison between the calculated results and the actual data of reactor demonstrates a fine match for Daya Bay Nuclear Power Station, and manifests the feasibility in simulating full-scope power conversion system of PWR by RELAP5 at the same time. (authors)

  17. The potential of decentralized power-to-heat as a flexibility option for the german electricity system: A microeconomic perspective

    International Nuclear Information System (INIS)

    Ehrlich, Lars G.; Klamka, Jonas; Wolf, André

    2015-01-01

    One fundamental challenge of the German energy transition for the electricity market is the growing imbalance between inflexible generation and generally inelastic load. Against this background, we investigate the future potential of decentralized Power-to-Heat (P2H) as an additional demand-side flexibility option for the German electricity system. Precisely, we analyze the case of hybrid systems, where conventional gas and oil condensing boiler systems are equipped with an electric heating rod. In contrast to previous approaches, we set our focus on the economic incentives at household level: only if the switch to a P2H-hybrid system can reduce individual heating expenses significantly, a considerable number of these systems will be installed. For this purpose, we implemented an integrated approach combining three distinct simulation modules. First, a stochastic simulation of the electricity spot market prices in 2020 was conducted. Second, average heat load profiles were generated based on a standard bottom-up analysis. Both results were then fed into an optimization model calculating the cost-minimizing paths of heat generation at household level during the year 2020. The simulated annual savings prove modest as long as household electricity prices are not heavily reduced through political influence. - Highlights: • We investigate the future potential of decentralized Power-to-Heat. • Focus lies on hybrid Power-to-Heat systems with condensing gas or oil boiler. • We analyze the economic incentives at household level. • Simulation of heat load profiles and spot prices in 2020. • Savings prove modest as long as household electricity prices are not heavily reduced.

  18. Decisions on Energy Demand Response Option Contracts in Smart Grids Based on Activity-Based Costing and Stochastic Programming

    Directory of Open Access Journals (Sweden)

    Alfred J. Hildreth

    2013-01-01

    Full Text Available Smart grids enable a two-way energy demand response capability through which a utility company offers its industrial customers various call options for energy load curtailment. If a customer has the capability to accurately determine whether to accept an offer or not, then in the case of accepting an offer, the customer can earn both an option premium to participate, and a strike price for load curtailments if requested. However, today most manufacturing companies lack the capability to make the correct contract decisions for given offers. This paper proposes a novel decision model based on activity-based costing (ABC and stochastic programming, developed to accurately evaluate the impact of load curtailments and determine as to whether or not to accept an energy load curtailment offer. The proposed model specifically targets state-transition flexible and Quality-of-Service (QoS flexible energy use activities to reduce the peak energy demand rate. An illustrative example with the proposed decision model under a call-option based energy demand response scenario is presented. As shown from the example results, the proposed decision model can be used with emerging smart grid opportunities to provide a competitive advantage to the manufacturing industry.

  19. Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming

    Science.gov (United States)

    Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.

  20. Food in the Schools, Part I. Options in Education, Program #75.

    Science.gov (United States)

    George Washington Univ., Washington, DC. Inst. for Educational Leadership.

    This document presents the program transcripts of a weekly series broadcast by member stations of National Public Radio. The program focuses on food in the schools. It addresses the following issues: plate waste in Chicago and Dallas; banning junk food and vending machines; the results of a vending machine junk food ban in West Virginia;…

  1. Healthy options: a community-based program to address food insecurity.

    Science.gov (United States)

    Dailey, Amy B; Hess, Audrey; Horton, Camille; Constantian, Emily; Monani, Salma; Wargo, Betsy; Davidson, Kim; Gaskin, Kathy

    2015-01-01

    The objectives of this study are to better understand the lived experience of food insecurity in our community and to examine the impact of a community-based program developed to increase access to local, healthy foods. Participants were given monthly vouchers to spend at local farmers' markets and invited to engage in a variety of community activities. Using a community-based participatory research framework, mixed methods were employed. Survey results suggest that most respondents were satisfied with the program and many increased their fruit and vegetable consumption. However, over 40% of respondents reported a higher level of stress over having enough money to buy nutritious meals at the end of the program. Photovoice results suggest that the program fostered cross-cultural exchanges, and offered opportunities for social networking. Building on the many positive outcomes of the program, community partners are committed to using this research to further develop policy-level solutions to food insecurity.

  2. On Computational Power of Quantum Read-Once Branching Programs

    Directory of Open Access Journals (Sweden)

    Farid Ablayev

    2011-03-01

    Full Text Available In this paper we review our current results concerning the computational power of quantum read-once branching programs. First of all, based on the circuit presentation of quantum branching programs and our variant of quantum fingerprinting technique, we show that any Boolean function with linear polynomial presentation can be computed by a quantum read-once branching program using a relatively small (usually logarithmic in the size of input number of qubits. Then we show that the described class of Boolean functions is closed under the polynomial projections.

  3. Program of RA reactor start-up to nominal power

    International Nuclear Information System (INIS)

    1959-01-01

    The zero start-up program is followed by the program of RA reactor start-up to nominal power. This program is described in detail and includes the following measurements: radiation characteristics at the exit of the channels; gamma and fast neutron dose distribution in the reactor; influence of absorbers on the reactivity; temperature effect; absolute flux and calibration of ionization chambers; xenon effect; thermal and hydraulics; dosimetry around the reactor; neutron flux in the reactor core and in the reactor hall; heavy water level; thermal characteristics after shutdown. A list of measuring devices and instrumentation is included with the detailed action plan and list of responsible staff members

  4. Manitoba Hydro's earth power program and Manitoba market update

    International Nuclear Information System (INIS)

    Pearson, K.

    2005-01-01

    An outline of Manitoba Hydro's Earth Power program was presented. Details of the heat pump market in Manitoba were provided, including details of residential and commercial sales. Total residential heat pump sales amounted to 577 units in 2004, equivalent to over $11.2 million in sales. Commercial installations amounted to approximately $12.7 million. An outline of industry players was presented. The goals of Manitoba Hydro were outlined in relation to geothermal energy and the Power Smart program. Their objectives included increasing awareness of geothermal energy, making heat pumps more accessible, and improving industry infrastructure. Other objectives included educating the public about life-cycle cost implications, residential loans and commercial incentives. To date, the residential power loan has provided financing to over 300 Manitoba home owners for installations, with electrical savings of over 1.34 Gwh and natural gas savings of 279,425 m 3 . The program is also committed to providing assistance with feasibility studies. Provincial tax credits for the Earth Program included a 10 per cent deduction of geothermal heat pump purchases from corporation income tax. Case studies of the program were presented along with an outline of the geothermal heat pump for homes booklet. Details of the residential earth power loan were provided, including details of installation, system completion and approval processes. Awards and accolades for the program include the 2004 HRAI Education supporter award and recognition by the David Suzuki Foundation, which highlighted the program as a national leader in encouraging and facilitating the use of GeoExchange technology. tabs, figs

  5. Reliability assurance program for operational emergency ac power system

    International Nuclear Information System (INIS)

    Heineman, J.B.; Ragland, W.A.; Mueller, C.J.

    1985-01-01

    A comprehensive review of emergency ac power systems in nuclear generating plants (the vast majority of these plants contain redundant diesel generator systems) delineates several operational areas that can be improved by instituting a reliability assurance program (RAP), which initially upgrades the diesel generator performance and provides for ongoing monitoring and maintenance based upon alert levels

  6. Knowledge Is Power Program (KIPP). What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2018

    2018-01-01

    The "Knowledge Is Power Program" ("KIPP") is a nonprofit network of more than 200 public charter schools educating early childhood, elementary, middle, and high school students. The What Works Clearinghouse (WWC) identified four studies of "KIPP" that fall within the scope of the Charter Schools topic area and meet…

  7. Photovoltaic Power System and Power Distribution Demonstration for the Desert RATS Program

    Science.gov (United States)

    Colozza, Anthony; Jakupca, Ian; Mintz, Toby; Herlacher, Mike; Hussey, Sam

    2012-01-01

    A stand alone, mobile photovoltaic power system along with a cable deployment system was designed and constructed to take part in the Desert Research And Technology Studies (RATS) lunar surface human interaction evaluation program at Cinder Lake, Arizona. The power system consisted of a photovoltaic array/battery system. It is capable of providing 1 kW of electrical power. The system outputs were 48 V DC, 110 V AC, and 220 V AC. A cable reel with 200 m of power cable was used to provide power from the trailer to a remote location. The cable reel was installed on a small trailer. The reel was powered to provide low to no tension deployment of the cable. The cable was connected to the 220 V AC output of the power system trailer. The power was then converted back to 110 V AC on the cable deployment trailer for use at the remote site. The Scout lunar rover demonstration vehicle was used to tow the cable trailer and deploy the power cable. This deployment was performed under a number of operational scenarios, manned operation, remote operation and tele-robotically. Once deployed, the cable was used to provide power, from the power system trailer, to run various operational tasks at the remote location.

  8. 75 FR 36659 - Proposed Collection; Comment Request; Brain Power! The NIDA Junior Scientist Program and the...

    Science.gov (United States)

    2010-06-28

    ... of the Brain Power! Program's ability to: Increase students' knowledge about the biology of the brain... Request; Brain Power! The NIDA Junior Scientist Program and the Companion Program, Brain Power! Challenge.... Proposed Collection: Title: Brain Power! The NIDA Junior Scientist Program, for grades K-5, and the...

  9. 76 FR 30147 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-05-24

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power.... SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the..., the Energy Management and Planning Program (Program), and the Conformed General Consolidated Power...

  10. 76 FR 23583 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-04-27

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power... Area Power Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), will apply the Energy Planning and Management Program (Program) Power Marketing Initiative (PMI), as...

  11. Global warming mitigation strategies and programs for power plant developers

    International Nuclear Information System (INIS)

    Holmes, N.R.

    1992-01-01

    Power plant developers are increasingly being surprised by regulatory agencies requiring them to mitigate the carbon dioxide(CO 2 ) emissions from their proposed power plants, as part of the plant's operating permit conditions. Since carbon dioxide is not a criteria pollutant with a National Ambient Air Quality Standard, power plant developers are often troubled by this additional regulatory requirement. This presentation will describe the contribution that CO 2 makes to global warming, the role of trees and forests as carbon sequesters or sinks, some non-forestry related and forestry related mitigation programs, including the advantages, disadvantages, and some cost estimates for the forestry related CO 2 mitigation programs. As public concern about global warming continues to escalate, it is almost certain that regulatory agencies will increase their focus on CO 2 mitigation

  12. HEDPIN: a computer program to estimate pinwise power density

    International Nuclear Information System (INIS)

    Cappiello, M.W.

    1976-05-01

    A description is given of the digital computer program, HEDPIN. This program, modeled after a previously developed program, POWPIN, provides a means of estimating the pinwise power density distribution in fast reactor triangular pitched pin bundles. The capability also exists for computing any reaction rate of interest at the respective pin positions within an assembly. HEDPIN was developed in support of FTR fuel and test management as well as fast reactor core design and core characterization planning and analysis. The results of a test devised to check out HEDPIN's computational method are given, and the realm of application is discussed. Nearly all programming is in FORTRAN IV. Variable dimensioning is employed to make efficient use of core memory and maintain short running time for small problems. Input instructions, sample problem, and a program listing are also given

  13. An Analysis of Return on Investment Options for the USMC Distance Learning Program

    National Research Council Canada - National Science Library

    Clark, Jamie

    2000-01-01

    A study was conducted to examine various aspects of Distance Learning (DL) applications currently under review by the Marine Corps, and determine whether these programs, if initiated, provide a positive Return on Investment (ROI...

  14. The role of the states in a federal climate program : issues and options

    Science.gov (United States)

    2009-11-01

    This paper provides an overview of some of the key isuses regarding statefederal roles in a federal climate program and identifies four possible mechanisms that have been suggested for allowing states to set more stringent reduction targets. *Cont...

  15. Case study on the US superconducting power transmission program

    Energy Technology Data Exchange (ETDEWEB)

    Hammel, E.F.

    1996-02-01

    After the 1911 discovery of superconductivity (the abrupt loss of electrical resistance in certain materials at very low temperatures), attempts were made to make practical use of this phenomenon. Initially these attempts failed, but in the early 1960s (after 50 years of research) they succeeded. By then, the projected growth in the production and consumption of electrical energy required much higher capacity power transmission capabilities than were available or likely to become available from incremental improvements in existing transmission technology. Since superconductors were capable in principle of transmitting huge amounts of power, research programs to develop and demonstrate superconducting transmission lines were initiated in the US and abroad. The history of the US program, including the participants, their objectives, funding and progress made, is outlined. Since the R&D program was terminated before the technology was completely demonstrated, the reasons for and consequences of this action are discussed in a final section.

  16. Multi-technology option strategy for long term R and D programs on plutonium technologies. Minimizing proliferation risks and preparing for the future

    International Nuclear Information System (INIS)

    Suzuki, Tatsujiro

    1997-01-01

    Plutonium programs worldwide are now facing major economic, political and technical challenges. New strategies need to address two distinctive global concerns: minimizing proliferation risks associated with plutonium use, and keeping the options alive to prepare for uncertain energy future. In order to meet those challenges, this paper proposes the introduction of 'multi-technology option strategy'. Such strategy is designed to keep so-called 'technological readiness' state of plutonium technologies worldwide without committing to a fixed technology option and exploring more innovative various technology options. This paper also suggests that such R and D programs can be coordinated and shared among nations that are interested in future plutonium use, and such cooperation can improve transparency of sensitive R and D programs. (author)

  17. Comparison of Technological Options for Distributed Generation-Combined Heat and Power in Rajasthan State of India

    Directory of Open Access Journals (Sweden)

    Ram Kumar Agrawal

    2013-01-01

    Full Text Available Distributed generation (DG of electricity is expected to become more important in the future electricity generation system. This paper reviews the different technological options available for DG. DG offers a number of potential benefits. The ability to use the waste heat from fuel-operated DG, known as combined heat and power (CHP, offers both reduced costs and significant reductions of CO2 emissions. The overall efficiency of DG-CHP system can approach 90 percent, a significant improvement over the 30 to 35 percent electric grid efficiency and 50 to 90 percent industrial boiler efficiency when separate production is used. The costs of generation of electricity from six key DG-CHP technologies; gas engines, diesel engines, biodiesel CI engines, microturbines, gas turbines, and fuel cells, are calculated. The cost of generation is dependent on the load factor and the discount rate. It is found that annualized life cycle cost (ALCC of the DG-CHP technologies is approximately half that of the DG technologies without CHP. Considering the ALCC of different DG-CHP technologies, the gas I.C. engine CHP is the most effective for most of the cases but biodiesel CI engine CHP seems to be a promising DG-CHP technology in near future for Rajasthan state due to renewable nature of the fuel.

  18. Distributed Energy Implementation Options

    Energy Technology Data Exchange (ETDEWEB)

    Shah, Chandralata N [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-13

    This presentation covers the options for implementing distributed energy projects. It distinguishes between options available for distributed energy that is government owned versus privately owned, with a focus on the privately owned options including Energy Savings Performance Contract Energy Sales Agreements (ESPC ESAs). The presentation covers the new ESPC ESA Toolkit and other Federal Energy Management Program resources.

  19. The Import-Substitution Adaptation of Power Engineering Programs

    Directory of Open Access Journals (Sweden)

    Aleksandr N. Kuzminov

    2017-03-01

    Full Text Available The realization problem of the import substitution policy in the context of existing programs for the individual branches development is considered in the paper on the example of power engineering. There is a contradiction to the objective of programs reflected in the process of alignment, which consists in stabilizing on the one hand and on the development of innovative on the other hand. In addition, the analysis of the implementation of power engineering of the Russian Federation for 2010-2020 and up to 2030 revealed significant shortcomings and deficiencies that reinforce the negative trends of this pairing. Classification of problems and purpose allowed choosing the most significant conceptual directions, methodologically based on the ideas of self-organization and balance, which can get instrumentality software by adapting programs for the development of power engineering in the system of the European model of Industry 4.0. As a fundamental position addresses the need for such a project, which would ensure the greatest impact with limited resources, including public funding, which lags far behind foreign. It is proposed to transform the efforts to implement the existing strategies of industry development in view of the policy of import substitution based on the implementation of the program of production of a balanced range of innovative products and providing replacement of imported equipment and the formation of the technological basis for the development of the industry

  20. Wind Power Today: Wind Energy Program Highlights 2001

    Energy Technology Data Exchange (ETDEWEB)

    2002-05-01

    Wind Power Today is an annual publication that provides an overview of the U.S. Department of Energy's Wind Energy Program accomplishments for the previous year. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describe the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry. This 2001 edition of Wind Power Today also includes discussions about wind industry growth in 2001, how DOE is taking advantage of low wind speed regions through advancing technology, and distributed applications for small wind turbines.

  1. Failure Is Not an Option: A Root Cause Analysis of Failed Acquisition Programs

    Science.gov (United States)

    2017-12-01

    marginal, if any, benefits to the warfighter. Marginal benefits include economic value, knowledge, skills, lessons learned, spin-off capabilities...as a tri- agency program between the Department of Commerce (National Oceanic and Atmospheric Administration), DOD, and the National Aeronautics and

  2. 10 CFR 420.17 - Optional elements of State Energy Program plans.

    Science.gov (United States)

    2010-01-01

    ... businesses, in order to improve energy technology product development and independent quality control testing... following: (1) Program activities of public education to promote energy efficiency, renewable energy, and... peak demands for energy and improve the efficiency of energy supply systems, including electricity...

  3. Curriculum Development for the Tourism Option of the Hospitality, Restaurant Management Program. Final Report.

    Science.gov (United States)

    Walk, Mary

    A project was undertaken to develop classroom materials for a tourism program that would integrate work experience and classroom instruction. After reviewing available literature, conferring with other educators, and conducting a series of interviews with persons employed in the hospitality industry, the researcher developed a set of instructional…

  4. A multiple objective mixed integer linear programming model for power generation expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Antunes, C. Henggeler; Martins, A. Gomes [INESC-Coimbra, Coimbra (Portugal); Universidade de Coimbra, Dept. de Engenharia Electrotecnica, Coimbra (Portugal); Brito, Isabel Sofia [Instituto Politecnico de Beja, Escola Superior de Tecnologia e Gestao, Beja (Portugal)

    2004-03-01

    Power generation expansion planning inherently involves multiple, conflicting and incommensurate objectives. Therefore, mathematical models become more realistic if distinct evaluation aspects, such as cost and environmental concerns, are explicitly considered as objective functions rather than being encompassed by a single economic indicator. With the aid of multiple objective models, decision makers may grasp the conflicting nature and the trade-offs among the different objectives in order to select satisfactory compromise solutions. This paper presents a multiple objective mixed integer linear programming model for power generation expansion planning that allows the consideration of modular expansion capacity values of supply-side options. This characteristic of the model avoids the well-known problem associated with continuous capacity values that usually have to be discretized in a post-processing phase without feedback on the nature and importance of the changes in the attributes of the obtained solutions. Demand-side management (DSM) is also considered an option in the planning process, assuming there is a sufficiently large portion of the market under franchise conditions. As DSM full costs are accounted in the model, including lost revenues, it is possible to perform an evaluation of the rate impact in order to further inform the decision process (Author)

  5. Nuclear Option in Korea

    International Nuclear Information System (INIS)

    Han, K. I.

    2002-01-01

    With sixteen(16) operating nuclear units in Korea, the share of nuclear power generation reached 41% of the total electric power generation as of December 2000. A prediction is that it would further increase to 44.5% by year 2015 according to the national long term power development plan. Four units are currently under construction with 6 more units in order. With little domestic energy resource and increasing energy demand to support national economic growth, Korea has chosen nuclear power as one of the major energy sources to ensure stable power supply and to promote energy self-sufficiency. It has been recognized that nuclear power in Korea is not a selective option but rather a necessity. The Korean nuclear power development started with construction of a 600 MWe size reactor that was designed and constructed by foreign vendors. As the national grid capacity became larger, the size of nuclear units increased to 1000 MWe class. In the mean time, the need for nuclear technology self-reliance grew not only in operation and maintenance but also in construction, manufacturing and design. For this, a nuclear technology self-reliance program has been embarked with the support of the Government and utility, and the 1000 MWe class KSNP(Korean Standard Nuclear Power Plant) has been developed. The KSNPs are currently being designed, manufactured, constructed and operated by relevant Korean entities themselves. To fit into a larger capacity national grid and also to improve nuclear economic competitiveness, the 1400 MWe class KNGR(Korean Next Generation Reactor) design has been developed uprating the 1000 MWe KSNP design. Its construction project is currently under contract negotiation, and is planned to be finished by 2010. In the mean time, to be ready for future electric power market deregulation, the 600 MWe class small KSNP design is being developed downsizing the KSNP. A modular small size reactor, SMART(System Integrated Modular Advanced Reactor) is also being

  6. Status and prospects of nuclear power programs in the Far East

    International Nuclear Information System (INIS)

    Min, K.S.

    1989-01-01

    Far Eastern countries such as China, Japan, Korea, and Taiwan show rapid energy demand growth due to expanding economic development. Each of these countries is considering nuclear energy as an ultimate energy option and is implementing the nuclear power program that reflects its own national circumstances. Even though the degrees of energy demand growth are different from one another depending on the level of industrialization, the energy demand growth is higher than in other regions of the world. And various concerns about nuclear safety and economy are expressed due to the changing sociopolitical environment, but the governments' will to support the nuclear program remains very strong. With such backgrounds, it is the common position in this region that the nuclear power system shall be maintained in the optimum balance with other energy systems, and the best efforts shall be devoted to enhancement of nuclear safety. In Korea, the nuclear energy policy debates with environmentalists, economists, and even with some radical students are becoming noticeable. In Japan, large-scale antinuclear demonstrations were held often this year with the participation of all members of Japanese society. In Taiwan, plans for the construction of nuclear power plants and the expansion of existing radwaste disposal facilities are facing objections from the environmentalists. It can be said that the antinuclear movement in the Far East is somewhat different form European countries and the Untied States in that most of the people in this region admit the importance of nuclear energy. It is quite evident that nuclear energy is an indispensable energy option for the world's future. The ultimate goal of world energy policy is the establishment of sustainable energy systems

  7. Virtual classes: a powerful mechanism in object-oriented programming

    DEFF Research Database (Denmark)

    Madsen, Ole Lehrmann; Møller-Pedersen, Birger

    1989-01-01

    The notions of class, subclass and virtual procedure are fairly well understood and recognized as some of the key concepts in object-oriented programming. The possibility of modifying a virtual procedure in a subclass is a powerful technique for specializing the general properties of the superclass....... In most object-oriented languages, the attributes of an object may be references to objects and (virtual) procedures. In Simula and BETA it is also possible to have class attributes. The power of class attributes has not yet been widely recognized. In BETA a class may also have virtual class attributes...

  8. Wind Powering America Anemometer Loan Program: A Retrospective

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez, T.

    2013-05-01

    This white paper details the history, mechanics, status, and impact of the Native American Anemometer Loan Program (ALP) conducted by the U.S. Department of Energy's Wind Powering America (WPA) initiative. Originally conceived in 2000 and terminated (as a WPA activity) at the end of FY 2011, the ALP has resulted in the installation of anemometers at 90 locations. In addition, the ALP provided support for the installation of anemometers at 38 additional locations under a related ALP administered by the Western Area Power Administration.

  9. Technical Proposal Salton Sea Geothermal Power Pilot Plant Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1975-03-28

    The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in which developmental geothermal utilization concepts can be tested and evaluated. Program efforts will be divided into four sub-programs; Power Generation, Mineral Extraction, Reservoir Production, and the Area Resources Test Facility. The Power Generation Subprogram will include testing of scale and corrosion control methods, and critical power cycle components; power cycle selection based on an optimization of technical, environmental and economic analyses of candidate cycles; preliminary design of a pilot geothermal-electric generating station to be constructed in Phase 2 of this program. The Mineral Extraction Subprogram will involve the following: selection of an optimum mineral recovery process; recommendation of a brine clean-up process for well injection enhancement; engineering, construction and operation of mineral recovery and brine clean-up facilities; analysis of facility operating results from environmental, economical and technical point-of-view; preliminary design of mineral recovery and brine clean-up facilities of sufficient size to match the planned pilot power plant. The Reservoir Production Subprogram will include monitoring the operation and maintenance of brine production, handling and injection systems which were built with private funding in phase 0, and monitoring of the brine characteristics and potential subsidence effects during well production and injection. Based on the above, recommendations and specifications will be prepared for production and

  10. Syrinx - a research program for the pulsed power radiation facility

    International Nuclear Information System (INIS)

    Etlicher, B.; Chuvatin, A.S.; Choi, P.

    1996-01-01

    Syrinx is a targeted research program with the objective to study, through practical examples, the fundamentals necessary to define the details of all parts which will be required for a new powerful plasma radiation source. The current level of activities of Syrinx is in the design and construction of a multi-megajoule class IES based pulsed power driver which will use long conduction Plasma Opening Switch technology. The present paper reviews mainly the basic experimental research of the POS a nd Z-pinch accomplished in the framework of Syrinx project. This work has a unique international level of participation, from conceptual designs to particular investigations. (author). 9 figs., 17 refs

  11. Lessons learned from the NREL village power program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.W. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NREL`s recent experiences and lessons learned.

  12. Lessons Learned from the NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.

    1998-07-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NRELs recent experiences and lessons learned.

  13. Enhancing materials management programs in nuclear power plants

    International Nuclear Information System (INIS)

    Hassaballa, M.M.; Malak, S.M.

    1992-01-01

    Materials management programs for the nuclear utilities in the United States are continually being affected, concurrent with the gradual disappearance of qualified component and replacement parts vendors by regulatory concerns about procurement and materials management. In addition, current economic and competitive pressures are forcing utilities to seek avenues for reducing procurement costs for safety-related items. In response to these concerns, initiatives have been undertaken and engineering guidelines have been developed by the nuclear power industry-sponsored organizations, such as the Electric Power Research Institute and the Nuclear Management Resources Council. It is our experience that successful materials management programs require a multitude of engineering disciplines and experience and are composed of three major elements: strategic procurement plan, parts classification and procurement data base, and enhancement tools. This paper provides a brief description of each of the three elements

  14. Status of NASA's Stirling Space Power Converter Program

    International Nuclear Information System (INIS)

    Dudenhoefer, J.E.; Winter, J.M.

    1994-01-01

    An overview is presented of the NASA Lewis Research Center Free-Piston Stirling Space Power Converter Technology Program. This work is being conducted under NASA's Civil Space Technology Initiative. The goal of the CSTI High Capacity Power Element is to develop the technology base needed to meet the long duration, high capacity power requirements for future NASA space initiatives. Efforts are focused upon increasing system power output and system thermal and electric energy conversion efficiency at least fivefold over current SP-100 technology, and on achieving systems that are compatible with space nuclear reactors. This paper will discuss Stirling experience in Space Power Converters. Fabrication is nearly completed for the 1050 K Component Test Power Converter (CTPC); results of motoring tests of the cold end (525 K), are presented. The success of these and future designs is dependent upon supporting research and technology efforts including heat pipes, bearings, superalloy joining technologies, high efficiency alternators, life and reliability testing and predictive methodologies. This paper provides an update of progress in some of these technologies leading off with a discussion of free-piston Stirling experience in space

  15. Options in Education: Program No. 88. Sex and Sexism in Education, Part II. Transcripts of a Weekly Series Broadcast by Member Stations of National Public Radio.

    Science.gov (United States)

    National Public Radio, Washington, DC.

    This booklet is a transcription of a program from the radio series, "Options in Education." It is part 2 of a two-part series dealing with sexism in education. It deals with sex discrimination in various aspects of public education, including textbooks, teacher promotion, sports programs and children's literature. There is also a…

  16. The Eurotransplant High-Urgency Heart Transplantation Program: an option for patients in acute heart failure?

    Science.gov (United States)

    Koch, A; Tochtermann, U; Remppis, A; Dengler, T J; Schnabel, P A; Hagl, S; Sack, F U

    2006-09-01

    The Eurotransplant High-Urgency (HU) Heart Transplantation Program allows urgent heart transplants to be carried out in rapidly deteriorating patients with acute-to-chronic heart failure on the elective waiting list. But do the results of HU heart transplantation justify performing primary heart transplantation in these critically ill patients and offer an acceptable outcome? Between 2000 and 2004, 64 heart transplantations (HTx) (32 elective and 32 HU-HTx) were performed in our department. After having been accepted in an auditing process based on HU criteria, intensive care patients in NYHA functional class IV (cardiac index 1.7 l/min/qm BS), in end-organ failure (creatinine 1.5 mg/dl), and with catecholamine dependence (dobutamine 8 microg/kg/min), are given priority with respect to organ allocation, and their data were compared to data from elective patients from the same period. HU requests were accepted in 97 % of cases. Two requests were not accepted, and both patients with contraindications for assist device implantation died within one week. The HU patients were 100 % in NYHA class IV, 93 % of the elective patients were in NYHA class III. Waiting time on the HU list was 13 days, and 7 of these patients died before HTx. Following heart transplantation, survival rates at 30 days and at one year of the HU group were 88 % and 85 % versus 94 % and 93 % in the elective group. This study shows that end-stage heart failure patients in the HU program can be transplanted primarily with good results if an organ is available in time. We are still in the position where the HU program only manages the organ shortage; there are still too many patients on the waiting list who die before receiving a donor organ.

  17. High-Power Microwave Transmission and Mode Conversion Program

    Energy Technology Data Exchange (ETDEWEB)

    Vernon, Ronald J. [Univ. of Wisconsin, Madison, WI (United States)

    2015-08-14

    This is a final technical report for a long term project to develop improved designs and design tools for the microwave hardware and components associated with the DOE Plasma Fusion Program. We have developed basic theory, software, fabrication techniques, and low-power measurement techniques for the design of microwave hardware associated gyrotrons, microwave mode converters and high-power microwave transmission lines. Specifically, in this report we discuss our work on designing quasi-optical mode converters for single and multiple frequencies, a new method for the analysis of perturbed-wall waveguide mode converters, perturbed-wall launcher design for TE0n mode gyrotrons, quasi-optical traveling-wave resonator design for high-power testing of microwave components, and possible improvements to the HSX microwave transmission line.

  18. Audit program for physical security systems at nuclear power plants

    International Nuclear Information System (INIS)

    Minichino, C.

    1982-01-01

    Licensees of nuclear power plants conduct audits of their physical security systems to meet the requirements of 10 CFR 73, Physical Protection of Plants and Materials. Section 73.55, Requirements for physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage, requires that the security programs be reviewed at least every 12 months, that the audit be conducted by individuals independent of both security management and security supervision, and that the audit program review all aspects of the physical security system: hardware, personnel, and operational and maintenance procedures. This report contains information for the Nuclear Regulatory Commission (NRC) and for the licensees of nuclear power reactors who carry out these comprehensive audits. Guidance on the overall management of the audit function includes organizational structure and issues concerning the auditors who perform the review: qualifications, independence, due professional care, and standards. Guidance in the audit program includes purpose and scope of the audit, planning, techniques, post-audit procedures, reporting, and follow-up

  19. The Obstacle Version of the Geometric Dynamic Programming Principle: Application to the Pricing of American Options Under Constraints

    International Nuclear Information System (INIS)

    Bouchard, Bruno; Vu, Thanh Nam

    2010-01-01

    We provide an obstacle version of the Geometric Dynamic Programming Principle of Soner and Touzi (J. Eur. Math. Soc. 4:201-236, 2002) for stochastic target problems. This opens the doors to a wide range of applications, particularly in risk control in finance and insurance, in which a controlled stochastic process has to be maintained in a given set on a time interval [0,T]. As an example of application, we show how it can be used to provide a viscosity characterization of the super-hedging cost of American options under portfolio constraints, without appealing to the standard dual formulation from mathematical finance. In particular, we allow for a degenerate volatility, a case which does not seem to have been studied so far in this context.

  20. Proceedings of the workshop on program options in intermediate-energy physics. Volume 1. Summary and panel reports

    Energy Technology Data Exchange (ETDEWEB)

    Allred, J.C.; Talley, B. (comps.)

    1980-05-01

    A Workshop on Program Options in Intermediate-Energy Physics sponsored by the US Department of Energy was held at Los Alamos Scientific Laboratory, August 20 to 31, 1979. The scope of the workshop included all laboratories in intermediate-energy physics, worldwide, and all of these sent representatives to the workshop. The workshop addressed itself to the critical questions on nuclear and particle physics and how they can best be investigated by intermediate-energy accelerators. Among the questions that the workshop members considered were: (1) what are the important physics topics which might be understood through research on these accelerators in the next 10 years. These topics include, but are not restricted to, fundamental interactions and symmetries in particle physics, and nuclear modes of motion, structure, and reaction mechanisms; (2) what experiments should be undertaken to carry out the program. What are the kinematical conditions, accuracies, resolutions, and other parameters required to obtain the desired knowledge; (3) which accelerators are best suited for each experiment. What work at other laboratories (low-, intermediate-, or high-energy) could be undertaken to complement and/or supplement the proposed LAMPF program; and (4) what new facility capabilities should be explored for the long-term future. The workshop was divided into small panels in order to promote effective interchange of ideas. After reports to other panels and plenary sessions, the panelists prepared reports stating the results of their deliberations. These reports comprise the principal part of Volume I.

  1. Proceedings of the workshop on program options in intermediate-energy physics. Volume 1. Summary and panel reports

    International Nuclear Information System (INIS)

    Allred, J.C.; Talley, B.

    1980-05-01

    A Workshop on Program Options in Intermediate-Energy Physics sponsored by the US Department of Energy was held at Los Alamos Scientific Laboratory, August 20 to 31, 1979. The scope of the workshop included all laboratories in intermediate-energy physics, worldwide, and all of these sent representatives to the workshop. The workshop addressed itself to the critical questions on nuclear and particle physics and how they can best be investigated by intermediate-energy accelerators. Among the questions that the workshop members considered were: (1) what are the important physics topics which might be understood through research on these accelerators in the next 10 years. These topics include, but are not restricted to, fundamental interactions and symmetries in particle physics, and nuclear modes of motion, structure, and reaction mechanisms; (2) what experiments should be undertaken to carry out the program. What are the kinematical conditions, accuracies, resolutions, and other parameters required to obtain the desired knowledge; (3) which accelerators are best suited for each experiment. What work at other laboratories (low-, intermediate-, or high-energy) could be undertaken to complement and/or supplement the proposed LAMPF program; and (4) what new facility capabilities should be explored for the long-term future. The workshop was divided into small panels in order to promote effective interchange of ideas. After reports to other panels and plenary sessions, the panelists prepared reports stating the results of their deliberations. These reports comprise the principal part of Volume I

  2. The Clean Coal Technology Program: Options for SO2, NOx, and particulate control

    International Nuclear Information System (INIS)

    Strakey, J.P.; Hargis, R.; Eastman, M.L.; Santore, R.R.

    1992-01-01

    There are currently 42 active projects in the Clean Coal Technology Program. The Pittsburgh Energy Technology Center (PETC) is responsible for managing 30 of these projects: five projects under Clean Coal 1, ten projects under Clean Coal 2, nine projects under Clean Coal 3, and six projects under Clean Coal 4. This paper describes each of the PETC projects, including the technologies involved and the project status. Many of the projects will use advanced approaches to meet current and future requirements for particulate and air toxic emissions. Discussion of these aspects have been expanded in this summary paper to address the focus of this symposium. Additional information can be provided to interested particles either through DOE, the participant or the technology supplier. Numerous non-federal organizations including state and utility/industry research groups provide important co-funding and other support for these CCT projects. Space limitations prohibit listing them in this paper; however, a complete listing can be found in the Clean Coal Technology Demonstration Program Update 1990. Appendix A to this paper contains flow diagrams for all the projects

  3. Energy options

    International Nuclear Information System (INIS)

    Hampton, Michael

    1999-01-01

    This chapter focuses on energy options as a means of managing exposure to energy prices. An intuitive approach to energy options is presented, and traditional definitions of call and put options are given. The relationship between options and swaps, option value and option exercises, commodity options, and option pricing are described. An end-user's guide to energy option strategy is outlined, and straight options, collars, participating swaps and collars, bull and bear spreads, and swaption are examined. Panels explaining the defining of basis risk, and discussing option pricing and the Greeks, delta hedging, managing oil options using the Black-Scholes model, caps, floors and collars, and guidelines on hedging versus speculation with options are included in the paper

  4. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  5. Investment recovery program at Niagara Mohawk Power Corporation

    International Nuclear Information System (INIS)

    Kotcamp, R.T.

    1993-01-01

    Niagara Mohawk Power Company's pioneering investment recovery program was initiated in 1984, Its mission is to dispose of company assets classified as obsolete, scrap, surplus, or retired capital equipment that results from company operations or work projects. These assets include items such as scrap wire, pipe, line hardware, transformers, power station equipment, crates of dusty telephone modems and computer monitors, pallets of residential gas and electric meters, a box of toilet paper holders, burned-out light bulbs, chunks of electric cable, brass and copper valves, electric bills from 1952, and a dozen tattered office chairs. It was risky for Niagara Mohawk to commit money to a program that created a scrap company inside a utility and is not the core business. No one regrets the decision to create and expand investment recovery. The program has contributed more than $35,000,000 ($8,140,585 nuclear division) of cash receipts with an additional $5,000,000 of cost avoidance since its inception. The program has credited these dollars back to the operating departments, which has reduced operating costs thereby improving the open-quotes bottom line.close quotes

  6. Practical standard for nuclear power plant life management programs: 2007

    International Nuclear Information System (INIS)

    2006-03-01

    The standard specifies the method of implementing nuclear power plant life management programs. The plant life management programs evaluate the integrity of the plant structures, systems and components, assessing if appropriate measures are taken against existing aging phenomena, if there are possibilities of occurrence and development of aging phenomena and if a sufficient level of margin is maintained to assure the integrity throughout the future operating period. The programs also assess the validity of the current maintenance activities, such as trend monitoring, walkdowns, periodic tests and inspections, repair and replacement work for the purpose of preventive maintenance, and utilization of lessons learned from past trouble experience, in order to newly identify maintenance measures. The technical evaluation on aging phenomena is conducted to establish the 10 year maintenance program for nuclear power plants until the plant reaches 30 years of service. The standard was established and issued by the Atomic Energy Society of Japan (AESJ) through the discussion of experts in the associated fields. (T. Tanaka)

  7. Identification of the real options in a program of nuclear plants; Identificacion de las opciones reales en un programa de plantas nucleoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Camacho G, D.; Diaz N, M. J.; Reinking C, A. [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Paseo Cuauhnahuac 8532, Jiutepec, Morelos 62550 (Mexico)]. e-mail: danielkmacho@yahoo.com.mx

    2008-07-01

    The development of our societies and our economies this intimately related to electric power and this as well with the generating sources, due to the projection of world-wide growth should go associate with a strategy of growth of energy generation. Considering to the nuclear power as an option to satisfy the energy needs that a country can provide two main immediate benefits: The stabilization of prices of security of provision of electric power of the nation. The care of the environment, since the gas discharges greenhouse are almost null. At the moment nuclear energy represents economically a viable option for the capital investment, taking into account the development from technology, the policies implemented by the state and the prices of other fuels. Due to the great investment that its require for the nuclear plants are necessary to use financial tools that allow to analyze the future scenes in which ours investment can be seen affected and to value the flexibility of being able to enlarge, to postpone or to stop our project in order to have majors profits or to diminish the lost ones. This valuation of the flexibility can be obtained from the called method Real Options. By analysis of Real Options the process is understood to apply to the methodology of the Financial Options to the valuation of projects or the management of real assets. The Real Options appear in flexible plans, projects, activities or enterprise investments, like for example, to leave or to sell the investment project before concluding it, changing to their use or its technology, to prolong their life, the option to choose, one or the other capacity, among others possibilities. In this work is an example of the application of the method of Real Options in the decision to invest or to defer the investment for the construction of a nuclear plant following the behavior of the tariffs in the market or the costs of generation of other technologies with which a nuclear plant competes. (Author)

  8. University role in nuclear power program in developing countries

    International Nuclear Information System (INIS)

    Notea, A.

    1977-01-01

    The academic education in nuclear engineering should be considered as a subsystem within the general nuclear program of the country as well as within the educational structure of the university. The academic trained personnel are of major importance as future participants in decisional and planning steps of the program. Hence, the ''production'' of academic manpower in this field should be started at the earliest steps. The nuclear engineering curriculum should be planned in accordance with the objectives stated by the power program and the challenges foreseen. Obviously, the objectives in a developing country are considerably different from those of developed countries highly advanced in the nuclear power field. The paper analyzes possible objectives in a developing country which intends to implement nuclear power program. In view of these objectives curricula planning for the undergraduate and graduate levels are presented and explained. The courses for undergraduates intend to provide basic information to relatively large numbers of students from various faculties, as they are expected to join the program at various constructional stages. Major emphasise is given to graduates as they will act in the cadre of senior engineers and officials of the country. The research works for theses in developed countries may be highly technical, dealing with crumbs of huge development project carried out on national or international level. Such research works are hardly justified in countries not involved in the project. In developing countries the problems to be confronted with are mainly licensing and siting and to much less extent nuclear power technology. Hence the choice of subjects for theses should be coherent with these directions. Obviously, the subjects are bound to the department manpower and budgetary limitations. As a demonstration two fields were analysed under our local constraints and objectives. Subjects suitable for theses are pointed out. The fields dealt

  9. Program change management during nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Bushart, Sean; Kim, Karen; Naughton, Michael

    2011-01-01

    Decommissioning a nuclear power plant is a complex project. The project involves the coordination of several different departments and the management of changing plant conditions, programs, and regulations. As certain project Milestones are met, the evolution of such plant programs and regulations can help optimize project execution and cost. This paper will provide information about these Milestones and the plant departments and programs that change throughout a decommissioning project. The initial challenge in the decommissioning of a nuclear plant is the development of a definitive plan for such a complex project. EPRI has published several reports related to decommissioning planning. These earlier reports provided general guidance in formulating a Decommissioning Plan. This Change Management paper will draw from the experience gained in the last decade in decommissioning of nuclear plants. The paper discusses decommissioning in terms of a sequence of major Milestones. The plant programs, associated plans and actions, and staffing are discussed based upon experiences from the following power reactor facilities: Maine Yankee Atomic Power Plant, Yankee Nuclear Power Station, and the Haddam Neck Plant. Significant lessons learned from other sites are also discussed as appropriate. Planning is a crucial ingredient of successful decommissioning projects. The development of a definitive Decommissioning Plan can result in considerable project savings. The decommissioning plants in the U.S. have planned and executed their projects using different strategies based on their unique plant circumstances. However, experience has shown that similar project milestones and actions applied through all of these projects. This allows each plant to learn from the experiences of the preceding projects. As the plant transitions from an operating plant through decommissioning, the reduction and termination of defunct programs and regulations can help optimize all facets of

  10. Factor of radioactive waste on nuclear power program

    International Nuclear Information System (INIS)

    Syed Abdul Malik Syed Zain

    2009-01-01

    Global warming phenomena and rising oil prices have brought the excitement of open space use of nuclear power. Arguments in favor of this technology range in terms of more environmentally friendly, energy diversification and cost efficiency has prompted the government to widen the choice of nuclear power be considered as a serious alternative. Despite the attractive factors to the use of these powers, there are also factors that stem from the continued development of nuclear power. These include the factor of safety, security, security of fuel supply, and public attention is often associated with radioactive waste management. This article attempts to debate specific to radioactive waste management factors that impact on public acceptance of a country's nuclear power program, especially in Malaysia. Starting from the absence of radioactive waste management policy to model uncertainty of the landfill and complications in selecting a repository site shows the basic infrastructure is still lacking. In addition, previous experience handling thorium waste has not reached a final settlement after several years of implementation. It reinforced the perception about the level of public confidence in the competence and attitude of local workers who are not very encouraging to pursue this advanced.

  11. PEP-II Large Power Supplies Rebuild Program at SLAC

    CERN Document Server

    de Lira, Antonio C; Lipari, James J; da Silva Rafael, Fernando

    2005-01-01

    At PEP-II, seven large power supplies (LGPS) are used to power quad magnets in the electron-positron collider region. The LGPS ratings range from 72kW to 270kW, and were installed in 1997. They are unipolar off-line switch mode supplies, with a 6 pulse bridge rectifying 480VAC, 3-phase input power to yield 650VDC unregulated. This unregulated 650VDC is then input into one (or two) IGBT H-bridges, which convert the DC into PWM 16 kHz square wave AC. This high frequency AC drives the primary side of a step-down transformer followed by rectifiers and low pass filters. Over the years, these LGPS have presented many problems mainly in their control circuits, making it difficult to troubleshoot and affecting the overall accelerator availability. A redesign/rebuilding program for these power supplies was established under the coordination of the Power Conversion Department at SLAC. During the 2004 accelerator summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control b...

  12. Program Leadership from a Nordic Perspective - Program Leaders' Power to Influence Their Program

    DEFF Research Database (Denmark)

    Högfeldt, Anna-Karin; Strömberg, Emma; Jerbrant, Anna

    2013-01-01

    research demonstrated that program leaders have quite different positions, strategies and methods when it comes to monitoring and developing their programs. In this paper, a deeper investigation is carried out of the (im-) possibilities to make real influence on the study courses that constitutes...... the respective Engineering study programs. Eight program leaders from the five N5T universities have been interviewed, and the analysis of these studies, has culminated in a model for the analysis of program leadership for Engineering education development....

  13. 78 FR 9936 - Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program...

    Science.gov (United States)

    2013-02-12

    ... Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program: Extension of Pilot Program AGENCY...: On March 31, 2011, HUD published a notice that announced HUD's FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program) known as FHA PowerSaver, which is a pilot program conducted for loans...

  14. ORNL superconducting technology program for electric power systems

    Science.gov (United States)

    Hawsey, R. A.

    1994-04-01

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the technology base needed by US industry for commercial development of electric power applications of high-temperature superconductivity. The two major elements of this program are conductor development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from information prepared for the FY 1993 Annual Program Review held July 28--29, 1993. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to industrial competitiveness projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer to US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire products.

  15. An assessment of the potentials of nuclear power and carbon capture and storage in the long-term global warming mitigation options based on Asian Modeling Exercise scenarios

    International Nuclear Information System (INIS)

    Mori, Shunsuke

    2012-01-01

    This paper presents an evaluation of global warming mitigation options based on scenarios from the Asian Modeling Exercise. Using an extended version of the integrated assessment model MARIA-23 (Multiregional Approach for Resource and Industry Allocation), we analyze nuclear fuel recycling options, carbon capture and storage technologies (CCS), and biomass utilization. To assess the potential implications of decreased social acceptance of nuclear power in the wake of the Fukushima nuclear accident, additional scenarios including a nuclear power expansion limitation, are analyzed. We also evaluate MARIA-23 model simulation estimates of long-term contributions and interrelationships among nuclear power, biomass, and CCS. Finally, potential costs of nuclear limitation under carbon control policies are assessed. The simulation results in this paper suggest the following: (1) under the reference scenario, global GDP losses in climate limitation scenarios range from 1.3% per year to 3.9% per year in 2060, rising to between 3.5% per year and 4.5% per year in 2100; (2) the use of nuclear fuel reprocessing technologies increase rapidly in all carbon control policy scenarios; (3) under a scenario where the price of CO 2 is $30 and nuclear power expansion is strictly limited, GDP losses increase significantly—from 4.5% per year to 6.4% per year by 2100; (4) nuclear power and CCS are substitute mitigation technologies. With nuclear power technology available CCS deployment reaches approximately 15,000 Mt-CO 2 per year by 2010; without a nuclear power option, CCS deployment rises to more than 80,000 Mt-CO 2 per year; and (5) biomass utilization cannot fully compensate for limitations to nuclear power expansion in policy scenarios. In addition to examining the role of these three technologies on global scales, we report results for several major Asian regions, namely Japan, China, and India. China tends to deploy nuclear power (if available) in response to rapidly growing

  16. XOQDOQ: computer program for the meteorological evaluation of routine effluent releases at nuclear power stations. Final report

    International Nuclear Information System (INIS)

    Sagendorf, J.F.; Goll, J.T.; Sandusky, W.F.

    1982-09-01

    Provided is a user's guide for the US Nuclear Regulatory Commission's (NRC) computer program X0QDOQ which implements Regulatory Guide 1.111. This NUREG supercedes NUREG-0324 which was published as a draft in September 1977. This program is used by the NRC meteorology staff in their independent meteorological evaluation of routine or anticipated intermittent releases at nuclear power stations. It operates in a batch input mode and has various options a user may select. Relative atmospheric dispersion and deposition factors are computed for 22 specific distances out to 50 miles from the site for each directional sector. From these results, values for 10 distance segments are computed. The user may also select other locations for which atmospheric dispersion deposition factors are computed. Program features, including required input data and output results, are described. A program listing and test case data input and resulting output are provided

  17. Nuclear Power Engineering Education Program, University of Illinois

    International Nuclear Information System (INIS)

    Jones, B.G.

    1993-01-01

    The DOE/CECo Nuclear Power Engineering Education Program at the University of Illinois in its first year has significantly impacted the quality of the power education which our students receive. It has contributed to: the recently completed upgrade of the console of our Advanced TRIGA reactor which increases the reactor's utility for training, the procurement of new equipment to upgrade and refurbish several of the undergraduate laboratory set-ups, and the procurement of computational workstations in support of the instructional computing laboratory. In addition, smaller amounts of funds were used for the recruitment and retention of top quality graduate students, the support of faculty to visit other institutions to attract top students into the discipline, and to provide funds for faculty to participate in short courses to improve their skills and background in the power area. These items and activities have helped elevate in the student's perspective the role of nuclear power in the discipline. We feel this is having a favorable impact on student career selection and on ensuring the continued supply of well educated nuclear engineering graduates

  18. High Performance Computing - Power Application Programming Interface Specification.

    Energy Technology Data Exchange (ETDEWEB)

    Laros, James H.,; Kelly, Suzanne M.; Pedretti, Kevin; Grant, Ryan; Olivier, Stephen Lecler; Levenhagen, Michael J.; DeBonis, David

    2014-08-01

    Measuring and controlling the power and energy consumption of high performance computing systems by various components in the software stack is an active research area [13, 3, 5, 10, 4, 21, 19, 16, 7, 17, 20, 18, 11, 1, 6, 14, 12]. Implementations in lower level software layers are beginning to emerge in some production systems, which is very welcome. To be most effective, a portable interface to measurement and control features would significantly facilitate participation by all levels of the software stack. We present a proposal for a standard power Application Programming Interface (API) that endeavors to cover the entire software space, from generic hardware interfaces to the input from the computer facility manager.

  19. Final argument relating to the Canadian nuclear power program

    International Nuclear Information System (INIS)

    Robertson, J.A.L.

    1978-05-01

    This report is the second brief, and one of a number of documents, submitted by Atomic Energy of Canada Limited (AECL) to the Ontario Royal Commission on Electric Power Planning. It is intended to update the original brief (AECL--5800) with respect to those matters that emerged during the course of the hearings and which had not been fully anticipated in that brief, as well as to summarize the AECL position on the various issues. To enable it to qualify as a ''final argument'' it contains only evidence or material that has been presented to the Royal Commission and is provided with marginal notations identifying the source of each section. It is AECL's position that the Canadian nuclear power program provides a safe, proven and efficient means of making a needed contribution to electricity supply, while strengthening the economy through the deployment of indigenous technology and resources. (author)

  20. Program Implementation of Option B+ at a President's Emergency Plan for AIDS Relief-Supported HIV Clinic Improves Clinical Indicators But Not Retention in Care in Mbarara, Uganda.

    Science.gov (United States)

    Miller, Kathleen; Muyindike, Winnie; Matthews, Lynn T; Kanyesigye, Michael; Siedner, Mark J

    2017-08-01

    2013 WHO guidelines for prevention of mother to child transmission recommend combination antiretroviral therapy (ART) for all pregnant women, regardless of CD4 count (Option B/B+). We conducted a retrospective analysis of data from a government-operated HIV clinic in Mbarara, Uganda before and after implementation of Option B+ to assess the impact on retention in care. We limited our analysis to women not on ART at the time of their first reported pregnancy with CD4 count >350. We fit regression models to estimate relationships between calendar period (Option A vs. Option B+) and the primary outcome of interest, retention in care. One thousand and sixty-two women were included in the analysis. Women were more likely to start ART within 6 months of pregnancy in the Option B+ period (68% vs. 7%, p Option B+ was associated with a nonsignificant 30% increased odds of retention in care at 1 year [adjusted odds ratio (AOR) = 1.30, 95% CI 0.98-1.73, p = 0.06]. After transition to an Option B+ program, pregnant women with CD4 count >350 were more likely to initiate combination therapy; however, interventions to mitigate losses from HIV care during pregnancy are needed to improve the health of women, children, and families.

  1. Status of the Romanian nuclear power program and the strategy related to the public information

    International Nuclear Information System (INIS)

    Stiopol, Mihaela; Chirica, Teodor

    1999-01-01

    The year 1997 represented for the Romanian nuclear power sector the year of the performances and capabilities proved Cernavoda NPP s unit operation, after one year of successful operation. Good performances of this unit could represent a positive impact on further development of nuclear power in Romania, considering first the completion of Unit 2 and for National Heavy Water Reactor Program. On the other hand, 'The years of 1997 and 1998 marked for the Romanian Electricity Authority a new and completely different perception of the Romanian power sector'. Recently, the first step of the restructuring of power sector has been accomplished. The Romanian Government approved the creation of the National Power Grid Company and the moving-out of the nuclear activities. The present Nuclear Power Group from RENEL was transformed in a separate entity, the National 'Nuclear Ellectrica' Company, including three subsidiaries, no legal persons, one for nuclear power production CNE-PROD (Cernavoda Unit 1), one for nuclear power development CNE-INVEST (Cernavoda Unit 2 to 5) and one for nuclear fuel fabrication FCN (Pitesti Nuclear Fuel Plant). The other Units from Nuclear Power Group, such as the Heavy Water Plant - ROMAG, Center of Technology and Engineering for Nuclear Projects - CTON and the Institute for Nuclear Research-Pitesti - ICN have been transformed in a state owned company for nuclear activities. To better understand the aspects related to the nuclear power in Romania and the necessity of the continuation and development of a public information strategy based on the new look of the nuclear power sector, please, allow me to present you a few things with regard the Romanian nuclear program. The main targets of Public Information Program Strategy considered when assessing the strategy related to the public information were: education and built-up of a credibility on the construction of a nuclear power plant in general, and of the Cernavoda NPP, in particular; and once

  2. Improving human reliability through better nuclear power plant system design: Program for advanced nuclear power studies

    International Nuclear Information System (INIS)

    Golay, M.W.

    1993-01-01

    The project on ''Development of a Theory of the Dependence of Human Reliability upon System Designs as a Means of Improving Nuclear Power Plant Performance'' was been undertaken in order to address the problem of human error in advanced nuclear power plant designs. Lack of a mature theory has retarded progress in reducing likely frequencies of human errors. Work being pursued in this project is to perform a set of experiments involving human subjects who are required to operate, diagnose and respond to changes in computer-simulated systems, relevant to those encountered in nuclear power plants, which are made to differ in complexity in a systematic manner. The computer program used to present the problems to be solved also records the response of the operator as it unfolds

  3. Severe accident management program at Cofrentes Nuclear Power Plant

    International Nuclear Information System (INIS)

    Borondo, L.; Serrano, C.; Fiol, M.J.; Sanchez, A.

    2000-01-01

    Cofrentes Nuclear Power Plant (GE BWR/6) has implemented its specific Severe Accident Management Program within this year 2000. New organization and guides have been developed to successfully undertake the management of a severe accident. In particular, the Technical Support Center will count on a new ''Severe Accident Management Team'' (SAMT) which will be in charge of the Severe Accident Guides (SAG) when Control Room Crew reaches the Emergency Operation Procedures (EOP) step that requires containment flooding. Specific tools and training have also been developed to help the SAMT to mitigate the accident. (author)

  4. On the Expressive Power of Temporal Concurrent Constraint Programming Languages

    DEFF Research Database (Denmark)

    Nielsen, Mogens; Palamidessi, Catuscia; Valencia, Frank D.

    2002-01-01

    The tcc paradigm is a formalism for timed concurrent constraint programming. Several tcc languages differing in their way of expressing infinite behavior have been proposed in the literature. In this paper we study the expressive power of some of these languages. In particular, we show that: (1......) recursive procedures with parameters can be encoded into parameterless recursive procedures with dynamic scoping, and viceversa. (2) replication can be encoded into parameterless recursive procedures with static scoping, and viceversa. (3) the languages from (1) are strictly more expressive than...

  5. Whistleblowers ask Congress to investigate TVA's nuclear power program

    International Nuclear Information System (INIS)

    Lane, E.

    1993-01-01

    Congress should investigate the Tennessee Valley Authority's nuclear power plant construction and operations programs as soon as possible, a coalition of Tennessee environmentalists and whistleblowers told reporters at a press conference in Washington, DC. The Foundation for Global Sustainability and four employees of TVA nuclear plants called for congressional action because they contend the Nuclear Regulatory Commission and the Department of Labor have failed to act to protect whistleblowers who report nuclear safety problems. The foundation contends the economics of nuclear plant construction by TVA do not make sense and in the rush to finish the Watts Bar nuclear plant, which has been under construction for 20 years, TVA has ignored safety issues

  6. Energy management in microgrid based on the multi objective stochastic programming incorporating portable renewable energy resource as demand response option

    International Nuclear Information System (INIS)

    Tabar, Vahid Sohrabi; Jirdehi, Mehdi Ahmadi; Hemmati, Reza

    2017-01-01

    Renewable energy resources are often known as cost-effective and lucrative resources and have been widely developed due to environmental-economic issues. Renewable energy utilization even in small scale (e.g., microgrid networks) has attracted significant attention. Energy management in microgrid can be carried out based on the generating side management or demand side management. In this paper, portable renewable energy resource are modeled and included in microgrid energy management as a demand response option. Utilizing such resources could supply the load when microgrid cannot serve the demand. This paper addresses energy management and scheduling in microgrid including thermal and electrical loads, renewable energy sources (solar and wind), CHP, conventional energy sources (boiler and micro turbine), energy storage systems (thermal and electrical ones), and portable renewable energy resource (PRER). Operational cost of microgrid and air pollution are considered as objective functions. Uncertainties related to the parameters are incorporated to make a stochastic programming. The proposed problem is expressed as a constrained, multi-objective, linear, and mixed-integer programing. Augmented Epsilon-constraint method is used to solve the problem. Final results and calculations are achieved using GAMS24.1.3/CPLEX12.5.1. Simulation results demonstrate the viability and effectiveness of the proposed method in microgrid energy management. - Highlights: • Introducing portable renewable energy resource (PRER) and considering effect of them. • Considering reserve margin and sensitivity analysis for validate robustness. • Multi objective and stochastic management with considering various loads and sources. • Using augmented Epsilon-constraint method to solve multi objective program. • Highly decreasing total cost and pollution with PRER in stochastic state.

  7. Business models and financing options for a rapid scale-up of rooftop solar power systems in Thailand

    International Nuclear Information System (INIS)

    Tongsopit, Sopitsuda; Moungchareon, Sunee; Aksornkij, Apinya; Potisat, Tanai

    2016-01-01

    Diverse solar PV business models and financing options exist in the international landscape, helping expand and accelerate the adoption of rooftop solar PV systems. The conditions for their emergence are context specific, depending on the policies, regulations, incentives, and market conditions of each country. After a review of the international landscape, this paper compiles and analyzes business models and financing options for rooftop solar PV investment in Thailand that have emerged during the period between 2013 and 2015. Despite policy discontinuity for the support of rooftop solar systems, diverse business models and financing options are driving market expansion and expanding solar access to more Thai consumers. Drawing on our policy and regulatory analyses and in-depth interviews with business representatives, we identify four types of business models and one financing option. The business models include Roof Rental, Solar PPA, Solar Leasing, and Community Solar, and the financing option is the solar loan. We analyze the drivers for their emergence, barriers to their success, and the risks from the business owners' and consumers' viewpoints. Our policy recommendation is focused on crafting a net-metering regulation with evidence-based studies on the potential costs and benefits to different stakeholders. - Highlights: •Advances understanding on PV business models in urban developing countries' context. •Reviews emerging rooftop solar business models in Thailand. •Thailand has a dynamic solar market despite policy uncertainties.

  8. Professional development for nuclear power programs in developing countries

    International Nuclear Information System (INIS)

    Kanter, M.A.

    1983-01-01

    Countries entering nuclear power programs for the first time find that inadequate planning for the development of trained manpower is a critical factor in the success of their programs. This requires the early training of a team for the planning and acquisition effort to be followed by training for the supervision of construction. In addition, there is the more readily recognized training for operation. Typical manpower needs for such projects have been documented by the International Atomic Energy Agency. The basic academic training of engineers and scientists, which should be available within the country; advanced academic training, which is often secured in institutions abroad; specialized training abroad by international agencies; specialized training by the vendors of nuclear equipment; and the development of indigenous training. This paper outlines all of these avenues but will concentrate on the training available through international agencies and on the development of indigenous training capability

  9. Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program

    International Nuclear Information System (INIS)

    McGuire, L.L.

    1991-01-01

    The Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program serves two purposes. The first is to track temperature trends during normal plant operation in areas where suspected deviations from established environmental profiles exist. This includes the use of Resistance Temperature Detectors, Recorders, and Temperature Dots for evaluation of equipment qualified life for comparison with tested parameters and the established Environmental Design Profile. It also may be used to determine the location and duration of steam leaks for effect on equipment qualified life. The second purpose of this program is to aid HVAC design engineers in determining the source of heat outside anticipated design parameters. Resistance Temperature Detectors, Recorders, and Temperature Dots are also used for this application but the results may include design changes to eliminate the excess heat or provide qualified equipment (cable) to withstand the elevated temperature, splitting of environmental zones to capture accurate temperature parameters, or continued environmental monitoring for evaluation of equipment located in hot spots

  10. METHODICAL APPROACHES TO THE CHOICE OF THE NEW GENERATION OF HIGH-VOLTAGE POWER TRANSMISSION LINE 220 kV OPTIONS

    Directory of Open Access Journals (Sweden)

    POSTOLATI V.M.

    2010-08-01

    Full Text Available The Transmission Power Lines of new generation are described in the article (single- compact, double-circuit compact, double-circuit Controlled Self-compensating High Voltage Transmission Power Lines (CSHVL. Basic principles of creation, design elements and comparative characteristics of the transmission lines of the new generation are described, the advantages of its are showed. Methodical approaches to the choosing of a new generation of transmission lines and facilities management FACTS are formulated. Methodical approaches to the choice of options for transmission lines 220 kV and facilities management are shown.

  11. A Study on the Economic Analysis for Overseas Project of New Nuclear Power Plant Using Binomial Option Pricing Model and Monte Carlo Simulation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Beong Gwon; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    Real options approach is suitable for evaluation of large-scale investment project with great uncertainties. Takizawa and Omori (2001) introduced a real option approach to calculate electricity price for economic feasibility. Rothwell (2006) modeled the net present value (NPV) of building an ABWR in Texas using ROA to determine the risk premium associated with net revenue uncertainty. W.C Yoon (2006) evaluated nuclear power plant construction value using DCF and ROA with sensitivity analysis. The value evaluations involved with nuclear power are very uncertain. This is because of a long period of construction as well as the cost uncertainties of decommissioning and nuclear waste management. Even more elements should be considered in new nuclear power valuation, including the uncertainty from the technology, operating costs, the potential risk of radiation, electricity mechanism and climate policy. In this respect, a traditional method such as discounted cash flow (DCF) can't fully catch the impacts of these uncertainties on nuclear power investment. So it is necessary to develop a proper method to handle such kinds of uncertainties to evaluate the new deployment of nuclear power plants. Meanwhile, overseas construction projects which are required capital investment, localization by target countries are increasing in these days. These elements may influence the uncertainty of project too.

  12. 76 FR 23795 - Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date

    Science.gov (United States)

    2011-04-28

    .... 110418247-1247-01] Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date AGENCY... receipt of applications for the Low-Power Television and Translator Upgrade Program (Upgrade Program) will... Rules to Establish Rules for Digital Low Power Television, Television Translator, and Television Booster...

  13. Nuclear power reactor analysis, methods, algorithms and computer programs

    International Nuclear Information System (INIS)

    Matausek, M.V

    1981-01-01

    Full text: For a developing country buying its first nuclear power plants from a foreign supplier, disregarding the type and scope of the contract, there is a certain number of activities which have to be performed by local stuff and domestic organizations. This particularly applies to the choice of the nuclear fuel cycle strategy and the choice of the type and size of the reactors, to bid parameters specification, bid evaluation and final safety analysis report evaluation, as well as to in-core fuel management activities. In the Nuclear Engineering Department of the Boris Kidric Institute of Nuclear Sciences (NET IBK) the continual work is going on, related to the following topics: cross section and resonance integral calculations, spectrum calculations, generation of group constants, lattice and cell problems, criticality and global power distribution search, fuel burnup analysis, in-core fuel management procedures, cost analysis and power plant economics, safety and accident analysis, shielding problems and environmental impact studies, etc. The present paper gives the details of the methods developed and the results achieved, with the particular emphasis on the NET IBK computer program package for the needs of planning, construction and operation of nuclear power plants. The main problems encountered so far were related to small working team, lack of large and powerful computers, absence of reliable basic nuclear data and shortage of experimental and empirical results for testing theoretical models. Some of these difficulties have been overcome thanks to bilateral and multilateral cooperation with developed countries, mostly through IAEA. It is the authors opinion, however, that mutual cooperation of developing countries, having similar problems and similar goals, could lead to significant results. Some activities of this kind are suggested and discussed. (author)

  14. DRDC Power and Energy S and T Option Analysis and Recommendations: A Response to Cross-Cutting Client S and T Requirements

    Science.gov (United States)

    2015-05-01

    Fuel 13% Diesel 8% Gasoline 3% Electricity 16% Natural Gas 9% Light Heating Oil 3% Heavy Heating Oil 2% Aviation Fuel 46% DRDC-RDDC-2015-R068...Support. Force Generation and Support Program deliverables:  Efficiency of engines , structures, lighting, etc. will be improved, alternate...with the aim of achieving greater operational energy efficiencies while maintaining, or improving, existing DND/CAF capabilities. The option

  15. Dynamic Power Management for Portable Hybrid Power-Supply Systems Utilizing Approximate Dynamic Programming

    Directory of Open Access Journals (Sweden)

    Jooyoung Park

    2015-05-01

    Full Text Available Recently, the optimization of power flows in portable hybrid power-supply systems (HPSSs has become an important issue with the advent of a variety of mobile systems and hybrid energy technologies. In this paper, a control strategy is considered for dynamically managing power flows in portable HPSSs employing batteries and supercapacitors. Our dynamic power management strategy utilizes the concept of approximate dynamic programming (ADP. ADP methods are important tools in the fields of stochastic control and machine learning, and the utilization of these tools for practical engineering problems is now an active and promising research field. We propose an ADP-based procedure based on optimization under constraints including the iterated Bellman inequalities, which can be solved by convex optimization carried out offline, to find the optimal power management rules for portable HPSSs. The effectiveness of the proposed procedure is tested through dynamic simulations for smartphone workload scenarios, and simulation results show that the proposed strategy can successfully cope with uncertain workload demands.

  16. Examining the Small Renewable Energy Power (SREP) Program in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K., E-mail: bsovacool@nus.edu.sg [Lee Kuan Yew School of Public Policy, National University of Singapore, 469C Bukit Timah Road, Singapore 259772 (Singapore); Drupady, Ira Martina [Lee Kuan Yew School of Public Policy, National University of Singapore, 469C Bukit Timah Road, Singapore 259772 (Singapore)

    2011-11-15

    The Small Renewable Energy Power (SREP) Program was the premier policy mechanism implemented by the national government to promote small-scale renewable electricity in Malaysia from 2001 to 2010. However, it managed meet less than 3 percent of its original goal by 2005. This study investigates what happened. More specifically, using a qualitative semi-structured interview approach with data presented in a narrative format, it answers the following five questions: (1) What are the primary energy policy and security challenges facing Malaysia? (2) What were the drivers behind the SREP in Malaysia? (3) What were the major benefits arising from the SREP? (4) What were the significant challenges to implementation? (5) What lessons or insights does the SREP offer for the study of energy policy design and implementation more generally? We find that the SREP failed to achieve its targets due to capacity caps, a lengthy approval process, lack of monitoring, exclusion of stakeholders, and few (if any) pre-feasibility studies. Other factors explaining its poor performance include opposition from the national utility Tenaga Nasional Berhad and electricity tariffs unmatched with true production costs. - Highlights: > The Small Renewable Energy Power Program aimed to install 500 MW by 2005. > It installed only 12 MW by December 2005. > This study investigates why the SREP failed to achieve its targets.

  17. Examining the Small Renewable Energy Power (SREP) Program in Malaysia

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Drupady, Ira Martina

    2011-01-01

    The Small Renewable Energy Power (SREP) Program was the premier policy mechanism implemented by the national government to promote small-scale renewable electricity in Malaysia from 2001 to 2010. However, it managed meet less than 3 percent of its original goal by 2005. This study investigates what happened. More specifically, using a qualitative semi-structured interview approach with data presented in a narrative format, it answers the following five questions: (1) What are the primary energy policy and security challenges facing Malaysia? (2) What were the drivers behind the SREP in Malaysia? (3) What were the major benefits arising from the SREP? (4) What were the significant challenges to implementation? (5) What lessons or insights does the SREP offer for the study of energy policy design and implementation more generally? We find that the SREP failed to achieve its targets due to capacity caps, a lengthy approval process, lack of monitoring, exclusion of stakeholders, and few (if any) pre-feasibility studies. Other factors explaining its poor performance include opposition from the national utility Tenaga Nasional Berhad and electricity tariffs unmatched with true production costs. - Highlights: → The Small Renewable Energy Power Program aimed to install 500 MW by 2005. → It installed only 12 MW by December 2005. → This study investigates why the SREP failed to achieve its targets.

  18. An Overview of Turkish Healthcare System after Health Transformation Program: Main Successes, Performance Assessment, Further Challenges, and Policy Options

    Directory of Open Access Journals (Sweden)

    Kadir GÜRSOY

    2015-02-01

    Full Text Available Turkish healthcare system has been stated to show significant improvements regarding wider access to healthcare facilities, and the quality and efficiency through the introduction of Health Transformation Program launched in 2003. While the old system relied on differing provisions and financing and lacked behind many developed nations in terms of health outcomes, the new system achieved nearly universal coverage and many health outcomes enhanced significantly. Health expenditures rose to 5.4% of GDP in 2013 from 4.8% in 1998. Furthermore, Turkey provided both better financial protection for the poor against high health expenditures, and equity in access to health care across the population. However, Turkey still faces new challenges to catch other developed countries to have better health and further improve financial sustainability. To reach these targets, Turkey needs to further implement new policy options for reform such as combating informal economy, allocating more on health resources, designing incentive- based payment methods, adopting gate keeping system and referral chain, developing capacity to deploy health technology assessments in reimbursement decisions, and ensuring the hospital autonomy.

  19. Proceedings of the Workshop on Program Options in Intermediate-Energy Physics. Keynote address: New directions in intermediate-energy nuclear physics

    International Nuclear Information System (INIS)

    Brown, G.E.

    1980-05-01

    This report presents the keynote address given by G.E. Brown at a LASL colloquium on August 21, 1979, for the Workshop on Program Options in Intermediate-Energy Physics. Professor Brown reviewed major topics of interest in intermediate-energy nuclear physics and suggested experimental approaches that might be most productive in the near future. 22 figures

  20. Options to address concerns regarding EU ETS induced increases in power prices and generators' profits. The case of carbon cost pass-through in Germany and the Netherlands

    International Nuclear Information System (INIS)

    Sijm, J.P.M.; Hers, J.S.; Wetzelaer, B.J.H.W.

    2008-02-01

    Power prices in EU countries have increased significantly since the European Emissions Trading Scheme (EU ETS) became effective on 1 January 2005. This suggests that these increases in power prices are due to this scheme, in particular the pass-through of the costs of EU allowances (EUAs) to cover the CO2 emissions of eligible installations. In all sectors, however - including the power sector - eligible installations have usually received almost all of their needed allowances for free during the first phase of the EU ETS (2005-07). In several EU countries, the coincidence of the increases in power prices and the implementation of the EU ETS has raised questions, and sometimes fierce political debate, on whether power producers have indeed passed through the costs of freely allocated CO2 allowances to electricity prices, and to what extent the increase in these prices can be attributed to this pass-through or to other factors. In addition, it has raised discussions on whether - and to what extent - the supposed passing through of these costs has led to additional profits for power producers, that is, the so-called 'windfall profits' induced by the EU ETS. Finally, the supposed ETSinduced increases in power prices and generators' profits has raised concerns affecting the legitimacy of the present EU ETS, including concerns regarding its impact on the international competitiveness of some powerintensive industries, the purchasing power of electricity end-users such as small households or, more generally, the distribution of social welfare among power producers and consumers. As a result, in several countries policy makers and stakeholders have suggested a variety of options to address these concerns, including changing the emissions trading allocation system, taxing windfall profits or controlling market prices of EU carbon allowances, electricity or both. Against this background, the objectives of this chapter include: (a) To analyse empirically the trends in power

  1. Human Resources Requirements for New Nuclear Power Programs

    International Nuclear Information System (INIS)

    Goodnight, Charles T.

    2014-01-01

    Summary: Planning to Meet HR Requirements for New Nuclear Power Programs Must Begin Early. Many years of preparation are required before the “Right Number of the Right People” … will be … “In the Right Place at the Right Time”. • Seven key steps which must be taken include: 1) Identify detailed Human Resources requirements, based on the selected site and reactor design; 2) Conduct an assessment of national capacity to develop and/or provide those resources; 3) Conduct a Gap Analysis to determine what additional steps will be needed to fill any capacity shortfalls; 4) Develop initial and recurring recruiting and training plans; 5) Begin recruiting and training; 6) Review and adjust as personnel move and/or leave; 7) Ensure adequate relationships are in place for sources of future recruiting

  2. Approaches to Education and Training for Kenya's Nuclear Power Program

    International Nuclear Information System (INIS)

    Kalambuka, H.A.

    2014-01-01

    1. Review of status and development of E and T for the nuclear power program in Kenya; 2. Review of challenges in nuclear E and T, and the initiatives being undertaken to mitigate them: • Recommendations for strategic action; 3. State of nuclear skills in the context of key drivers of the global revival in nuclear energy; 4. Point of view: Education in Applied Nuclear and Radiation physics at Nairobi: • Its growth has helped identify the gaps, and relevant practical approaches for realizing the broad spectrum of technical capacity to conduct a national NPP; 5. Proposed approach to support the E and T infrastructure necessary to allow the country to plan, construct, operate, regulate, and safely and securely handle nuclear facilities sustainably; 6. Specified E and T initiatives in the context of the national industrial development strategy and nuclear energy policy and funding for the complete life cycle and technology localization. (author)

  3. Power plant system assessment. Final report. SP-100 Program

    International Nuclear Information System (INIS)

    Anderson, R.V.; Atkins, D.F.; Bost, D.S.

    1983-01-01

    The purpose of this assessment was to provide system-level insights into 100-kWe-class space reactor electric systems. Using these insights, Rockwell was to select and perform conceptual design studies on a ''most attractive'' system that met the preliminary design goals and requirements of the SP-100 Program. About 4 of the 6 months were used in the selection process. The remaining 2 months were used for the system conceptual design studies. Rockwell completed these studies at the end of FY 1983. This report summarizes the results of the power plant system assessment and describes our choice for the most attractive system - the Rockwell SR-100G System (Space Reactor, 100 kWe, Growth) - a lithium-cooled UN-fueled fast reactor/Brayton turboelectric converter system

  4. Development of a SPV management program for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Eun-Chan; Na, Jang-Hwan; Lee, Doo-Young; Oh, Seong-Jong; Jerng, Dong-Wook

    2009-01-01

    The Single Point Vulnerability (SPV) is a characteristic of a component whose failure results in plant transients. KHNP (Korea Hydro and Nuclear Power Co.) has evaluated major systems with critical components and developed a SPV management program to reduce the trip frequency and to raise plant's availability. This study includes a comprehensive methodology for SPV evaluation and its results. This methodology consists of the qualitative evaluation focused on the SPV component list preparation and the quantitative evaluation through FMEA (Failure Mode Effect Analyses) and FTA (Fault Tree Analyses) of critical systems. The qualitative evaluation reduced differences of the SPV lists between the identically designed plants and established strategies for the improvement of the SPV component reliability. The quantitative evaluation identified additional SPV components and developed the fault tree model for a Trip Monitor which showed logic relationships of channel components in the trip-related systems. (author)

  5. Rehabilitation Options

    Science.gov (United States)

    ... Speech Pathology Occupational Therapy Art Therapy Recreational therapy Neuropsychology Home Care Options Advanced Care Planning Palliative Care ... Speech Pathology Occupational Therapy Art Therapy Recreational therapy Neuropsychology Home Care Options Advanced Care Planning Palliative Care ...

  6. Development of the nuclear power program of the Philippines

    International Nuclear Information System (INIS)

    Ibe, L.D.; Corpus, G.C.

    1976-01-01

    In 1958, Republic Act 2067, referred to as the Philippine Science Act of 1958, was enacted into law. This Act created, among other things, the Philippine Atomic Energy Commission (PAEC) as the principal agency responsible for the promotion of atomic energy for peaceful purposes. The idea of the Philippine Government in creating PAEC was to develop the country's capability in nuclear and reactor technology to meet anticipated manpower needs in large-scale application of nuclear energy for the production of electrical energy. The national demand for electric power and energy was then increasing steadily with the growth in industry, in economic activities, in population, and with the improvement of the standard of living of the Filipino people. The PAEC acquired a 1-MW nuclear research reactor and envisioned it to serve as the starting nucleus of the nuclear power program. Through its installation and subsequent operation, it aimed to attract the interest of engineers and technologists to the nuclear field, while simultaneously building its capability to undertake research on atomic energy and radioisotope applications

  7. Cost effective snubber reduction program for nuclear power plants

    International Nuclear Information System (INIS)

    Adams, T.M.; Antaki, G.A.; Chang, K.C.

    1985-01-01

    Due to the stringent seismic requirements imposed on nuclear power plants, piping engineers have resorted to the extensive use of snubbers to support nuclear piping systems. The advantage of snubbers is that they provide dynamic restraint while allowing free thermal growth of the pipe. Unfortunately, as more plants go into operation, utilities have to face the costs of strict in-service inspection requirements and risks of unscheduled or extended plant outages associated with snubber failures. The snubber inspection requirements, defined in plant Technical Specifications, require periodic visual inspections of all snubbers and functional tests of a percentage of the plant snubbers, during refueling outages. For a typical 1000 Mw unit this represents from 50 to several hundred snubbers to be functionally tested at each refueling outage. Should failures occur during testing, the sample size must be further increased. Very quickly the costs and risks of extended shutdowns have led the industry to consider, and in many cases implement, snubber reduction programs. At the same time several changes in seismic design criteria have greatly facilitated the reduction of snubbers, making snubber elimination economically and technically attractive. In this paper we examine the costs and benefits of snubber reduction programs and propose a method for evaluating their cost benefits

  8. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J. [Pacific Northwest Lab., Richland, WA (United States); Roybal, A.L. [Western Area Power Administration, Golden, CO (United States)

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  9. 76 FR 81487 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-12-28

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project Post-2017 Remarketing AGENCY... . Information regarding Western's BCP Post-2017 marketing efforts, the Energy Management and Planning Program... Proposals. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the...

  10. Public perceptions of nuclear power, climate change and energy options in Britain: summary findings of a survey conducted during October and November 2005

    Energy Technology Data Exchange (ETDEWEB)

    Wouter Poortinga; Nick Pidgeon; Irene Lorenzoni [University of East Anglia, Norwich (United Kingdom). Centre for Environmental Risk, School of Environmental Sciences

    2006-07-01

    This report presents the findings of a large-scale British survey (n=1491) of public opinion towards future energy options for the nation, with a focus on attitudes to nuclear power in the context of climate change. People are generally more interested and concerned about climate change than they are about nuclear power. People tend to favour renewable energy sources over fossil fuels, whilst nuclear power is the least favoured of the three. When asked about the future contribution of energy sources to reliable and secure electricity supplies, a slightly different picture appears: renewables are still most favoured, but nuclear power now gains a ranking above coal and oil and one comparable with gas. People do differentiate various electricity generation sources in terms of their (generally positive and negative) factors. In this respect the general stigma attached to nuclear power remains. Specifically, many people think it creates dangerous waste and is a hazard to human health. On the other hand, most people perceive wind power as clean, safe, good for the economy and cheap. Coal on the other hand is seen as polluting and (correctly) as a cause of climate change. If the costs of supplying the UK's energy needs were the same from either nuclear power or renewable energy sources, 77% of the respondents indicated they would prefer renewable energy sources. Less than 10% would prefer nuclear power over renewables under such circumstances. There was a strong preference for solutions other than nuclear power to mitigate climate change, such as promoting renewable energies (78%), or through lifestyle changes and energy efficiency (76%). 14 refs., 3 tabs.

  11. Hinkley Point 'C' power station public inquiry: proof of evidence on comparison of non-fossil options to Hinkley Point 'C'

    International Nuclear Information System (INIS)

    Goddard, S.C.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom. This evidence to the Inquiry sets out and explains the non-fossil fuel options, with particular reference to renewable energy sources and other PWR locations; gives feasibility, capital cost, performance and total resource estimates for the renewable sources; and shows that no other non-fossil fuel source is to be preferred to Hinkley Point ''C''. (author)

  12. Safety analysis program for steam generators replacement and power uprate at Tihange 2 nuclear power plant

    International Nuclear Information System (INIS)

    Delhaye, X.; Charlier, A.; Damas, Ph.; Druenne, H.; Mandy, C.; Parmentier, F.; Pirson, J.; Zhang, J.

    2002-01-01

    The Belgian Tihange 2 nuclear power plant went into commercial operation in 1983 producing a thermal power of 2785 MW. Since the commissioning of the plant the steam generators U-tubes have been affected by primary stress corrosion cracking. In order to avoid further degradation of the performance and an increase in repair costs, Electrabel, the owner of the plant, decided in 1997 to replace the 3 steam generators. This decision was supported by the feasibility study performed by Tractebel Energy Engineering which demonstrated that an increase of 10% of the initial power together with a fuel cycle length of 18 months was achieved. Tractebel Energy Engineering was entrusted by Electrabel as the owner's engineer to manage the project. This paper presents the role of Tractebel Energy Engineering in this project and the safety analysis program necessary to justify the new operation point and the fuel cycle extension to 18 months re-analysis of FSAR chapter 15 accidents and verification of the capacity of the safety and auxiliary systems. The FSAR chapter 15 accidents were reanalyzed jointly by Framatome and Tractebel Energy Engineering while the systems verifications were carried out by Tractebel Energy Engineering. (author)

  13. Assessment of air pollution emissions and evaluation of renewable energy as mitigation option-power generation sector of Pakistan

    International Nuclear Information System (INIS)

    Harijan, K.H.; Uqaili, M.A.; Memon, M.

    2005-01-01

    Energy is an engine for growth and is linked with all aspects of development, poverty alleviation, and improvement of quality of life. The production, distribution and use of energy particularly fossil fuels have significant environmental impacts. Pakistan has total power generation capacity of 19.25 GW, with 63.9% thermal, 33.7% hydel and 2.4% nuclear share. The electricity generation increased by 7.5% per annum during the last three decades and future demand has been projected to grow at 7%-11 % per annum. This increasing power demand will depend mainly on power generation from fossil fuels. This paper presents the review of power generation situation and assesses the air pollution emissions from thermal power generation in Pakistan. The paper also investigates the prospects of renewable energy- sources for air pollution mitigation in the country. The study indicates that thermal power generation plants are the major source of air pollution emissions in the country. This air pollution has local, regional and global environmental impacts. The paper concludes that the use of renewables such as hydel, wind, solar and biomass energy for power generation can contribute substantially in air pollution mitigation in the country. (author)

  14. The IEAGHG Power Plant Assessment Program (PPAP). Development and testing June 2002-October 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-12-15

    The Power Plant Assessment Program (PPAP) is an Excel based program which allows alternative CO{sub 2} capture technologies for centralised power generation to be compared using multi-criteria analysis. This report outlines recent development work on the program and the results obtained from evaluating a range of novel capture processes with it.

  15. Technology Development Program for an Advanced Potassium Rankine Power Conversion System Compatible with Several Space Reactor Designs

    Energy Technology Data Exchange (ETDEWEB)

    Yoder, G.L.

    2005-10-03

    This report documents the work performed during the first phase of the National Aeronautics and Space Administration (NASA), National Research Announcement (NRA) Technology Development Program for an Advanced Potassium Rankine Power Conversion System Compatible with Several Space Reactor Designs. The document includes an optimization of both 100-kW{sub e} and 250-kW{sub e} (at the propulsion unit) Rankine cycle power conversion systems. In order to perform the mass optimization of these systems, several parametric evaluations of different design options were investigated. These options included feed and reheat, vapor superheat levels entering the turbine, three different material types, and multiple heat rejection system designs. The overall masses of these Nb-1%Zr systems are approximately 3100 kg and 6300 kg for the 100- kW{sub e} and 250-kW{sub e} systems, respectively, each with two totally redundant power conversion units, including the mass of the single reactor and shield. Initial conceptual designs for each of the components were developed in order to estimate component masses. In addition, an overall system concept was presented that was designed to fit within the launch envelope of a heavy lift vehicle. A technology development plan is presented in the report that describes the major efforts that are required to reach a technology readiness level of 6. A 10-year development plan was proposed.

  16. Hiding the tobacco power wall reduces cigarette smoking risk in adolescents: using an experimental convenience store to assess tobacco regulatory options at retail point-of-sale.

    Science.gov (United States)

    Shadel, William G; Martino, Steven C; Setodji, Claude M; Scharf, Deborah M; Kusuke, Daniela; Sicker, Angela; Gong, Min

    2015-11-23

    This experiment tested whether changing the location or visibility of the tobacco power wall in a life sized replica of a convenience store had any effect on adolescents' susceptibility to future cigarette smoking. The study was conducted in the RAND StoreLab (RSL), a life sized replica of a convenience store that was developed to experimentally evaluate how changing aspects of tobacco advertising displays in retail point-of-sale environments influences tobacco use risk and behaviour. A randomised, between-subjects experimental design with three conditions that varied the location or visibility of the tobacco power wall within the RSL was used. The conditions were: cashier (the tobacco power wall was located in its typical position behind the cash register counter); sidewall (the tobacco power wall was located on a sidewall away from the cash register); or hidden (the tobacco power wall was located behind the cashier but was hidden behind an opaque wall). The sample included 241 adolescents. Hiding the tobacco power wall significantly reduced adolescents' susceptibility to future cigarette smoking compared to leaving it exposed (ie, the cashier condition; p=0.02). Locating the tobacco power wall on a sidewall away from the cashier had no effect on future cigarette smoking susceptibility compared to the cashier condition (p=0.80). Hiding the tobacco power wall at retail point-of-sale locations is a strong regulatory option for reducing the impact of the retail environment on cigarette smoking risk in adolescents. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  17. Case study on comparative assessment of nuclear and coal-fueled electricity generation options and strategy for nuclear power development in China

    International Nuclear Information System (INIS)

    Zhao Shiping; Shi Xiangjun; Bao Yunqiao; Mo Xuefeng; Wei Zhihong; Fang Dong; Ma Yuqing; Li Hong; Pan Ziqiang; Li Xutong

    2001-01-01

    China, as other countries in the world, is seeking for a way of sustainable development. In energy/electricity field, nuclear power is one of electric energy options considering the Chinese capability of nuclear industry. The purpose of this study is to investigate the role of nuclear power in Chinese energy/electricity system in future by comprehensive assessment. The main conclusions obtained from this study are: (1) China will need a total generation capacity of 750 - 879 GW in 2020, which means new power units of 460 - 590 GW generation capacity will be built from 2001 to 2020. (2) the total amount of SO 2 emission from power production will rise to 16 - 18 Mt in 2020, about 2.8 - 3.2 times of 1995, even if the measures to control SO 2 emission are taken for all new coal units. (3) CO 2 emission from electricity generation will reach 21 - 24 Gt in 2020. (4) the environmental impacts and health risks of coal-fired energy chain are greater than that of nuclear chain. The normalized health risk caused by coal chain is 20.12 deaths/GW·a but 4.63 deaths/GW·a by nuclear chain in China. (5) As estimated by experts, there will be a shortage of 200 GW in 2050 in China even if considering the maximum production of coal, the utilization of hydropower and renewable resource. Nuclear power is the only way to fill the gap between demand and supply

  18. Summary of the electric power supply program for fiscal 1981

    International Nuclear Information System (INIS)

    Shimada, Minoru

    1981-01-01

    The plans of electric power supply for fiscal 1981 (from April, 1981, to March, 1982) by the power companies were formulated and submitted to the Ministry of International Trade and Industry. Along with the current up trend of economic activities, the demands of electric power will be on the increase. A summer peak of power consumption may rise all the more due to the increase in room-cooling units. On the other hand, the problem of petroleum is unsettled. Under the situation, the principal considerations behind the formulation of the plans are the effective utilization of other energy resources than oil and the suppression of oil-burning power generation, the economical usage of all power generation facilities and stabilized demand and supply, and the promotion of wide-area operation. The situation in fiscal 1981, power demands, power source facilities demand and supply balance, and the interchange of power among power companies are described. (J.P.N.)

  19. Nuclear power plant thermal-hydraulic performance research program plan

    International Nuclear Information System (INIS)

    1988-07-01

    The purpose of this program plan is to present a more detailed description of the thermal-hydraulic research program than that provided in the NRC Five-Year Plan so that the research plan and objectives can be better understood and evaluated by the offices concerned. The plan is prepared by the Office of Nuclear Regulatory Research (RES) with input from the Office of Nuclear Reactor Regulation (NRR) and updated periodically. The plan covers the research sponsored by the Reactor and Plant Systems Branch and defines the major issues (related to thermal-hydraulic behavior in nuclear power plants) the NRC is seeking to resolve and provides plans for their resolution; relates the proposed research to these issues; defines the products needed to resolve these issues; provides a context that shows both the historical perspective and the relationship of individual projects to the overall objectives; and defines major interfaces with other disciplines (e.g., structural, risk, human factors, accident management, severe accident) needed for total resolution of some issues. This plan addresses the types of thermal-hydraulic transients that are normally considered in the regulatory process of licensing the current generation of light water reactors. This process is influenced by the regulatory requirements imposed by NRC and the consequent need for technical information that is supplied by RES through its contractors. Thus, most contractor programmatic work is administered by RES. Regulatory requirements involve the normal review of industry analyses of design basis accidents, as well as the understanding of abnormal occurrences in operating reactors. Since such transients often involve complex thermal-hydraulic interactions, a well-planned thermal-hydraulic research plan is needed

  20. Modeling a power-to-renewable methane system for an assessment of power grid balancing options in the Baltic States’ region

    International Nuclear Information System (INIS)

    Zoss, Toms; Dace, Elina; Blumberga, Dagnija

    2016-01-01

    Highlights: • A mathematical modeling framework developed for assessing power-to-methane systems. • An integrated system of wind power, electrolysis, biogas and methanation assessed. • Power system is more stable with methanizing biogas with H_2 from excess wind power. • Accumulation of H_2 limits production of renewable methane. • Large potential for wind power development in the Baltic States. - Abstract: The explicit tendency to increase the power generation from stochastic renewable resources forces to look for technological solutions of energy management and storage. In the recent years, the concept of power-to-gas, where the excess energy is converted into hydrogen and/or further methanized into renewable methane, is gaining high popularity among researchers. In this study, we assess the power-to-renewable methane system as the potential technology for power grid balancing. For the assessment, a mathematical model has been developed that assists in understanding of whether a power-to-renewable methane system can be developed in a region with specific installed and planned capacities of wind energy and biogas plants. Considering the varying amount of excess power available for H_2 production and the varying biogas quality, the aim of the model is to simulate the system to determine, if wind power generation meets the needs of biogas plants for storing the excess energy in the form of methane via the methanation process. For the case study, the Baltic States (Estonia, Latvia, and Lithuania) have been selected, as the region is characterized by high dependence on fossil energy sources and electricity import. The results show that with the wind power produced in the region it would be possible to increase the average CH_4 content in the methanized biogas by up to 48.4%. Yet, even with a positive H_2 net production rate, not in all cases the maximum possible quality of the renewable methane would be achieved, as at moments the necessary amount of H_2 for

  1. Effects of interruptible load program on equilibrium outcomes of electricity markets with wind power

    Energy Technology Data Exchange (ETDEWEB)

    An, Xuena; Zhang, Shaohua; Li, Xue [Shanghai Univ. (China). Key Lab. of Power Station Automation Technology

    2013-07-01

    High wind power penetration presents a lot of challenges to the flexibility and reliability of power system operation. In this environment, various demand response (DR) programs have got much attention. As an effective measure of demand response programs, interruptible load (IL) programs have been widely used in electricity markets. This paper addresses the problem of impacts of the IL programs on the equilibrium outcomes of electricity wholesale markets with wind power. A Cournot equilibrium model of wholesale markets with wind power is presented, in which IL programs is included by a market demand model. The introduction of the IL programs leads to a non-smooth equilibrium problem. To solve this equilibrium problem, a novel solution method is proposed. Numerical examples show that IL programs can lower market price and its volatility significantly, facilitate the integration of wind power.

  2. Economic and financial approaches to planning relatively high capital cost energy options such as hydroelectric power development

    Energy Technology Data Exchange (ETDEWEB)

    Warnock, J.G.; Merrett, A.J.

    1984-04-01

    The need for levelization has been widely recognized as desirable on grounds of equity. This paper points that it is also essential to the validity of the long-term present value criterion for capital investment. Yet the advocated methods of levelization are generally unacceptable or inefficient. These methods could be made more efficient - for example by the interest differential guarantee proposal outlined above. Until such time as effective and efficient levelization measures are implemented it has to be recognized that under present day inflationary conditions the conventional criteria of long-term present value may well be devoid of any economic validity. These issues can be of very significant importance in judging those energy options for future electrical generator modes.

  3. Assessing the impact of framing on the comparative favourability of nuclear power as an electricity generating option in the UK

    International Nuclear Information System (INIS)

    Jones, Christopher R.; Eiser, J. Richard; Gamble, Tim R.

    2012-01-01

    In 2007 the UK government's public consultation on the future of nuclear power courted much criticism. Three studies were conducted to assess whether key arguments used by government within this consultation might have influenced public opinion about the technology. Participants first read a passage of text that made salient certain positive (climate change mitigation, increased energy security) or negative (nuclear waste) aspects of the nuclear debate. Participants then completed a task that required them to create an electricity mix for the UK by varying the contributions made by each of five energy sources (coal, gas, nuclear, renewables and electric import). Study 1 seemed to indicate that pitching the debate in terms of climate change mitigation was effective in increasing endorsement of nuclear power. The results of studies 2 and 3, however, contested this conclusion, suggesting that these arguments were having little direct impact upon participants' preferences for nuclear power. The results of these studies hold implications for UK energy policy and attitude assessment and can contribute to the understanding of how the arguments used by government in the 2007 consultation might have influenced public opinion. - Highlights: ► Three studies investigate the acceptability of nuclear power in response to ‘framing’ used by government in 2007 UK consultation. ► Acceptability of nuclear power was compared against four energy sources in an ‘electricity calculator’ task. ► Study 1 showed an apparent increase in the endorsement of nuclear following climate change ‘framing’. ► Studies 2 and 3 contradict this finding, suggesting that ‘framing’ had a limited direct effect on preferences for nuclear power.

  4. Computer program for afterheat temperature distribution for mobile nuclear power plant

    Science.gov (United States)

    Parker, W. G.; Vanbibber, L. E.

    1972-01-01

    ESATA computer program was developed to analyze thermal safety aspects of post-impacted mobile nuclear power plants. Program is written in FORTRAN 4 and designed for IBM 7094/7044 direct coupled system.

  5. The status of the Canadian nuclear power program and possible future strategies

    International Nuclear Information System (INIS)

    Foster, J.S.; Critoph, E.

    1975-01-01

    Canada is fortunate in having developed a versatile and flexible power reactor concept-one which can be kept economically competitive into the distant future, while at the same time offering opportunities for large reductions in uranium requirements. The one CANDU concept provides a range of alternatives, at least as extensive in terms of adaptation to changing economic and uranium supply conditions as that of most other nuclear power programs consisting of two or more distinct reactor types. The range includes reduced capital costs through use of boiling light water and organic cooled options, better thermal efficiency through use of the organic cooled option, and the ability to minimize the impact of changing economic parameters and improve uranium utilization through use of Pu recycle and/or thorium fuel with uranium recycle. AECL has devoted considerable effort over the last few years to study of advanced fuel cycles in the various CANDU reactor types. Very few feasibility questions have been uncovered. A detailed conceptual study of our currently favoured vehicle for Pu recycle, CANDU-BLW (PB), a plutonium burning, boiling light water cooled CANDU, has indicated that it could be initiated with no major problems. Development would be required in a number of areas-notably, fuel design and computational methods for fuel management. The results indicate a savings of some 15-20% in plant capital costs over the natural uranium CANDU-PHW and a reduction of almost a factor of two in uranium requirements. More general studies of thorium fuelled concepts are also encouraging. The reactor designs are almost identical to those for uranium CANDU reactors and so no new feasibility problems are introduced. We recognize feasibility problems associated with specific fuels in specific CANDU types, but there appear to be none in the areas of reactor physics, control, safety and fuel management. These concepts are competitive with CANDU-PHWs even for current economic conditions

  6. A NASA high-power space-based laser research and applications program

    Science.gov (United States)

    Deyoung, R. J.; Walberg, G. D.; Conway, E. J.; Jones, L. W.

    1983-01-01

    Applications of high power lasers are discussed which might fulfill the needs of NASA missions, and the technology characteristics of laser research programs are outlined. The status of the NASA programs or lasers, laser receivers, and laser propulsion is discussed, and recommendations are presented for a proposed expanded NASA program in these areas. Program elements that are critical are discussed in detail.

  7. Infrastructures Development Strategy in Energy Engineering Education and Research: a Bonus to Introduce a Safe and Secure Nuclear Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Bouhelal, Oum Keltoum [National School of Mineral Industry, ENIM, BP 753, Agdal, 10000 Rabat (Morocco)

    2008-07-01

    and D programs is in process; several kinds of scientific exchanges are engaged to provide a scientific network aiming to master a multidimensional learning: a capacity building strategy is targeted to study the means to face the NPP's relevant challenges and improve the labour sector standards in order to make nuclear power a viable option. (author)

  8. Infrastructures Development Strategy in Energy Engineering Education and Research: a Bonus to Introduce a Safe and Secure Nuclear Power Program

    International Nuclear Information System (INIS)

    Bouhelal, Oum Keltoum

    2008-01-01

    programs is in process; several kinds of scientific exchanges are engaged to provide a scientific network aiming to master a multidimensional learning: a capacity building strategy is targeted to study the means to face the NPP's relevant challenges and improve the labour sector standards in order to make nuclear power a viable option. (author)

  9. Power: Constitutional Update. Bar/School Partnership Programs Series.

    Science.gov (United States)

    American Bar Association, Chicago, IL. Special Committee on Youth Education for Citizenship.

    The fourth in a special series of handbooks dealing with constitutional themes, this document looks at power in the context of the U.S. Constitution. "The Constitution's Prescription for Freedom" (L. Peach) examines the separation of powers provided for in the Constitution. "The Concept of Power" (C. Roach) is a series of…

  10. Fruitful symbiosis: Why an export bundled with wind energy is the most feasible option for North African concentrated solar power

    International Nuclear Information System (INIS)

    Kost, Christoph; Pfluger, Benjamin; Eichhammer, Wolfgang; Ragwitz, Mario

    2011-01-01

    The idea of generating electricity in North Africa using concentrating solar thermal power (CSP) has been around for some time now but has recently gained momentum through the Mediterranean Solar Plan (MSP) and the formation of the Desertec Industrial Initiative. This paper argues that while the large-scale deployment of CSP in North Africa does not seem economically attractive for either European or African institutions or countries on their own at present, combining domestic use and electricity exports could be profitable for both parties. A detailed economic portfolio covering both solar and wind power plants can achieve competitive price levels, which would accelerate the diffusion of solar technology in North Africa. This portfolio could be financed partially by exporting electricity from solar thermal plants in North Africa via HVDC interconnections to European consumers. Sharing the costs in this way makes it possible to generate solar electricity for the domestic market at a reasonable cost. Some of the electricity produced from the solar power plants and wind parks in North Africa is sold on European energy markets in the form of a long-term contracted solar-wind portfolio, which would qualify for support from the financial incentive schemes of the European Member States (e.g. feed-in tariffs). This transfer of green electricity could help to meet the targets for energy from renewable energy sources (RES) in the EU Member States as the new EU Directive of 2009 opened the European electricity market to imports from third states. - Research highlights: → This paper describes a feasible approach to financing a larger deployment of CSP in North Africa. → The proposed portfolio includes local consumption and electricity export to Europe. → Bundling wind with solar power as a business model for exporting solar electricity. → Prices of the solar-wind mix are competitive with other renewable energy sources. → Scenario outlook for the North African CSP

  11. Fruitful symbiosis: Why an export bundled with wind energy is the most feasible option for North African concentrated solar power

    Energy Technology Data Exchange (ETDEWEB)

    Kost, Christoph, E-mail: christoph.kost@ise.fraunhofer.de [Fraunhofer Institute for Solar Energy Systems ISE, Heidenhofstrasse 2, 79110 Freiburg (Germany); Pfluger, Benjamin, E-mail: benjamin.pfluger@isi.fraunhofer.de [Fraunhofer Institute for Systems and Innovation Research ISI, Breslauer Strasse 48, 76139 Karlsruhe (Germany); Eichhammer, Wolfgang, E-mail: wolfgang.eichhammer@isi.fraunhofer.de [Fraunhofer Institute for Systems and Innovation Research ISI, Breslauer Strasse 48, 76139 Karlsruhe (Germany); Ragwitz, Mario, E-mail: mario.ragwitz@isi.fraunhofer.de [Fraunhofer Institute for Systems and Innovation Research ISI, Breslauer Strasse 48, 76139 Karlsruhe (Germany)

    2011-11-15

    The idea of generating electricity in North Africa using concentrating solar thermal power (CSP) has been around for some time now but has recently gained momentum through the Mediterranean Solar Plan (MSP) and the formation of the Desertec Industrial Initiative. This paper argues that while the large-scale deployment of CSP in North Africa does not seem economically attractive for either European or African institutions or countries on their own at present, combining domestic use and electricity exports could be profitable for both parties. A detailed economic portfolio covering both solar and wind power plants can achieve competitive price levels, which would accelerate the diffusion of solar technology in North Africa. This portfolio could be financed partially by exporting electricity from solar thermal plants in North Africa via HVDC interconnections to European consumers. Sharing the costs in this way makes it possible to generate solar electricity for the domestic market at a reasonable cost. Some of the electricity produced from the solar power plants and wind parks in North Africa is sold on European energy markets in the form of a long-term contracted solar-wind portfolio, which would qualify for support from the financial incentive schemes of the European Member States (e.g. feed-in tariffs). This transfer of green electricity could help to meet the targets for energy from renewable energy sources (RES) in the EU Member States as the new EU Directive of 2009 opened the European electricity market to imports from third states. - Research Highlights: > This paper describes a feasible approach to financing a larger deployment of CSP in North Africa. > The proposed portfolio includes local consumption and electricity export to Europe. > Bundling wind with solar power as a business model for exporting solar electricity. > Prices of the solar-wind mix are competitive with other renewable energy sources. > Scenario outlook for the North African CSP market in

  12. Summary of Recent Results from NASA's Space Solar Power (SSP) Programs and the Current Capabilities of Microwave WPT Technology

    Science.gov (United States)

    McSpadden, James; Mankins, John C.; Howell, Joe T. (Technical Monitor)

    2002-01-01

    The concept of placing enormous solar power satellite (SPS) systems in space represents one of a handful of new technological options that might provide large-scale, environmentally clean base load power into terrestrial markets. In the US, the SPS concept was examined extensively during the late 1970s by the U.S. Department of Energy (DOE) and the National Aeronautics and Space Administration (NASA). More recently, the subject of space solar power (SSP) was reexamined by NASA from 1995-1997 in the "fresh look" study, and during 1998 in an SSP "concept definition study". As a result of these efforts, in 1999-2000, NASA undertook the SSP Exploratory Research and Technology (SERT) program which pursued preliminary strategic technology research and development to enable large, multi-megawatt SSP systems and wireless power transmission (WPT) for government missions and commercial markets (in-space and terrestrial). During 2001-2002, NASA has been pursuing an SSP Concept and Technology Maturation (SCTM) program follow-on to the SERT, with special emphasis on identifying new, high-leverage technologies that might advanced the feasibility of future SSP systems. In addition, in 2001, the U.S. National Research Council (NRC) released a major report providing the results of a peer review of NASA's SSP strategic research and technology (R&T) road maps. One of the key technologies needed to enable the future feasibility of SSP/SPS is that of wireless power transmission. Advances in phased array antennas and rectennas have provided the building blocks for a realizable WPT system. These key components include the dc-RF converters in the transmitter, the retrodirective beam control system, and the receiving rectenna. Each subject is briefly covered, and results from the SERT program that studied a 5.8 GHz SPS system are presented. This paper presents a summary results from NASA's SSP efforts, along with a summary of the status of microwave WPT technology development.

  13. Simulators in the training program for nuclear power plants

    International Nuclear Information System (INIS)

    Grimm, E.

    1988-01-01

    The principle simulator of the reactor school of the Paul Scherrer Institute is described. A compact simulator at the nuclear power plant Beznau is used for beginners as well as for refresher courses. Full simulator training cannot be taken in Switzerland. The Swiss nuclear power plants take advantage of the services of foreign nuclear power plants or training centers. The role of the instructor is discussed

  14. Integrated Portfolio Analysis: Return on Investment and Real Options Analysis of Intelligence Information Systems (Cryptologic Carry On Program)

    Science.gov (United States)

    2006-09-30

    14 IV. Proof-of-Concept: USS Readiness Case Study 16 A. Background 17 B. Applying KVA Methodology 19 C. KVA Results 20 D. Real Options Analysis 23...technology assets. • Quantifying intangible human capital assets (i.e., training, skills, knowledge). The average large company spends the equivalent of...Portfolios/Motorola, Unilever • IT Infrastructure/Credit Suisse • Electricity/Peaker-Plants • Acquisitions/Seagate • Contracts/Syngenta, GM Although

  15. Resource Contingency Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  16. Options for the ultimate storage of low and medium level radioactive wastes produced at Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Emeterio, Miguel

    1991-01-01

    The devoted time and still to be expend in prepare, execute and teach permanent and safe solutions to the problem of the evaluation of radioactive wastes reflects the political, economic and environmental importance with respect to public health and safety invested in this task, as well as, its technological challenges. In the case of Laguna Verde nuclear power plant, its low and medium level radioactive wastes are stored in the beginning in a temporal store with a capacity of 2000 m 3 sufficient to four years of normal operation; according to what it is necessary to select one of different ways of waste storage. Different technologies has been evaluated and the preliminary conclusion is that for Mexico the more feasible way to store radioactive wastes is in tumulus (Author)

  17. Potential impact of (CET) carbon emissions trading on China’s power sector: A perspective from different allowance allocation options

    DEFF Research Database (Denmark)

    Cong, Ronggang; Wei, Yi-Ming

    2010-01-01

    of traditional methods. We establish an agent-based model, CETICEM (CET Introduced China Electricity Market), of introduction of CET to China. In CETICEM, six types of agents and two markets are modeled. We find that: (1) CET internalizes environment cost; increases the average electricity price by 12......In Copenhagen climate conference China government promised that China would cut down carbon intensity 40–45% from 2005 by 2020. CET (carbon emissions trading) is an effective tool to reduce emissions. But because CET is not fully implemented in China up to now, how to design it and its potential......%; and transfers carbon price volatility to the electricity market, increasing electricity price volatility by 4%. (2) CET influences the relative cost of different power generation technologies through the carbon price, significantly increasing the proportion of environmentally friendly technologies; expensive...

  18. Estimation and diminution of CO2 emissions by clean development mechanism option at power sector in Oman

    Energy Technology Data Exchange (ETDEWEB)

    Singh Solanki, Parmal; Sarma Mallela, Venkateswara [Caledonian (University) College of Engineering, Muscat (Oman); Zhou, Chengke [Glasgow Caledonian University, Glasgow, Scotland (United Kingdom)

    2013-07-01

    Carbon dioxide (CO2) is one of the major pollutants among greenhouse gases emitted by fossil fuel based power plants and responsible for environmental tribulations. Therefore diminution of carbon dioxide level by Clean Development Mechanism (CDM) is now serious concern worldwide. This paper evaluates the emission factors of national electric grid in Oman and proposes a wind energy based CDM project to diminish the CO2 emissions. Estimations show that operating margin emission factors of national grid during five years lies in the range of 0.74 to 0.69 kg CO2/kWh. Further, proposed CDM project revealed the annual baseline emissions reduction of 45552 ton CO2 and able to earn the revenue of US$ 61.49 million by certify emission reductions in the first crediting period of project. Paper also critically analyse the opportunities for CDM project, its lucrative aspect, barrier and challenges.

  19. State program on scientific support of nuclear power development in Belarus

    International Nuclear Information System (INIS)

    Mikhalevich, A.

    2010-01-01

    Following the decision on NPP construction in Belarus, the Organization on Technical and Scientific Support of Nuclear Power Development (Joint Institute of Power and Nuclear Research - 'Sosny') has been nominated. In 2009, the Government adopted the State Program on Scientific Support of Nuclear Power Development in the Republic of Belarus for period up to 2020. The paper reviews activities implemented within the framework of this Program. (author)

  20. Budget Options

    National Research Council Canada - National Science Library

    2000-01-01

    This volume-part of the Congressional Budget Office's (CBO's) annual report to the House and Senate Committees on the Budget-is intended to help inform policymakers about options for the federal budget...

  1. 75 FR 19966 - Boulder Canyon Project-Post-2017 Application of the Energy Planning and Management Program Power...

    Science.gov (United States)

    2010-04-16

    ... Application of the Energy Planning and Management Program Power Marketing Initiative AGENCY: Western Area... and Management Program (Program) Power Marketing Initiative (PMI) (10 CFR part 905) to the Boulder... Power Administration (Western), Desert Southwest Region, a Federal power marketing agency of the...

  2. Wind Power Today: 1998 Wind Energy Program Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Tromly, K.

    1999-06-17

    The US Department of Energy's Office of Energy Efficiency and Renewable Energy manages the Federal Wind Energy Program. The mission of the program is to help the US wind industry to complete the research, testing, and field verification needed to fully develop advanced wind technologies that will lead the world in cost-effectiveness and reliability. This publication, printed annually, provides a summary of significant achievements in wind energy made during the previous calendar year. Articles include wind energy in the Midwest, an Alaskan wind energy project, the US certification program, structural testing, and the federal program in review.

  3. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  4. 2004 Power marketing program draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    This is volume 3 of a draft environmental impact statement from the Western Power Administration's Sierra Nevada Region. Information is included on the following topics: statutory and legal framework; Sierra Nevada region customer groups and economic regions; renewable technology cost information matrix; hydrological assumptions; recreation resources along river reaches and the delta; archaeological and historical aspects; power resources in PROSYM; air quality regulatory structure; energy generation for PROSYM cases; overall power costs for utility, agriculture, and other customers; socioeconomic impacts in specific economic regions; projected air resource impacts; and land use, water quality, and solid waste impact factors

  5. Power Systems Modeling for the ONR SSL-TM Program

    Science.gov (United States)

    2015-10-01

    3.4 (R2013b) MATLAB Coder Version 2.5 (R2013b) MATLAB Compiler Version 5.0 (R2013b) Neural Network Toolbox Version 8.1 (R2013b) Optimization...synchronous machine that works both as a generator and a rotor, and a bidirectional power converter that interfaces it to the ship’s power system...0-3- <Si^ * ■ ** ** T Synchronous motor drive J L ! Synchronous generator and bidirectional power converter Figure 20: FESS block

  6. Alberta Environment's weir safety program : options for rehabilitation to improve public safety : a case study of the Calgary weir

    Energy Technology Data Exchange (ETDEWEB)

    Blakely, D. [Alberta Environment, Edmonton, AB (Canada)

    2009-07-01

    Alberta Environment Water Management Operations (WMO) owns and operates 46 dams and 800 kilometres of canals in Alberta. The WMO consists of 120 staff and several contract operators to take care of this infrastructure. Most of the infrastructure supplies water for irrigation use, which adds 5 billion dollars to the provincial economy annually. Other water uses include stock watering, domestic use, municipal use, recreational use and habitat. Alberta Environment's weir safety program was also discussed along with options for rehabilitation to improve public safety. A case study of Calgary's Weir Dam on the Bow River was highlighted. A brief history of the dam was offered and safety programs around provincially-owned weirs were discussed. Photographs were included to illustrate some of the additional safety measures at the Calgary weir, such as suspended safety buoys upstream of the boom directing paddlers to the portage trail, and signage on the river that can be activated when the boom is out. Typical river users on the Calgary Bow River and safety history at the Calgary Weir were discussed along with other topics such as the Calgary Bow River weir project criteria; project design progress; pre-feasibility options; scale modelling; final design analysis; construction funding; and proposed changes to the safety program for the new weir configuration. figs.

  7. Progress in the pulsed power Inertial Confinement Fusion program

    International Nuclear Information System (INIS)

    Quintenz, J.P.; Matzen, M.K.; Mehlhorn, T.A.

    1996-01-01

    Pulsed power accelerators are being used in Inertial Confinement Fusion (ICF) research. In order to achieve our goal of a fusion yield in the range of 200 - 1000 MJ from radiation-driven fusion capsules, it is generally believed that ∼10 MJ of driver energy must be deposited within the ICF target in order to deposit ∼1 MJ of radiation energy in the fusion capsule. Pulsed power represents an efficient technology for producing both these energies and these radiation environments in the required short pulses (few tens of ns). Two possible approaches are being developed to utilize pulsed power accelerators in this effort: intense beams of light ions and z- pinches. This paper describes recent progress in both approaches. Over the past several years, experiments have successfully answered many questions critical to ion target design. Increasing the ion beam power and intensity are our next objectives. Last year, the Particle Beam Fusion Accelerator H (PBFA II) was modified to generate ion beams in a geometry that will be required for high yield applications. This 2048 modification has resulted in the production of the highest power ion beam to be accelerated from an extraction ion diode. We are also evaluating fast magnetically-driven implosions (z-pinches) as platforms for ICF ablator physics and EOS experiments. Z-pinch implosions driven by the 20 TW Saturn accelerator have efficiently produced high x- ray power (> 75 TW) and energy (> 400 kJ). Containing these x-ray sources within a hohlraum produces a unique large volume (> 6000 mm 3 ), long lived (>20 ns) radiation environment. In addition to studying fundamental ICF capsule physics, there are several concepts for driving ICF capsules with these x-ray sources. Progress in increasing the x-ray power on the Saturn accelerator and promise of further increases on the higher power PBFA II accelerator will be described

  8. Determination Public Acceptance Segmentation for Nuclear Power Program Interest

    International Nuclear Information System (INIS)

    Syirrazie Che Soh; Aini Wahidah Abdul Wahab

    2012-01-01

    This paper is focus to discuss segmentation aspect among inter-disciplinary group of public. This discussion is the pre-stage to ensure the right initiative strategies are implemented to gain public interest and acceptance towards on developing nuclear power plant. The applied strategies are implemented based on different interest among the different groups of public. These strategies may increase public acceptance level towards developing nuclear power plant. (author)

  9. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  10. 2004 Power marketing program draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    The Western Area Power Administration (Western), created in 1977 under the Department of Energy (DOE) Organization Act, markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of power from the Central Valley Project (CVP) and other sources, and markets available nonfirm energy from the Washoe Project. The Sierra Nevada Region's marketing area is shown in Figure 1. 1. Western's mission is to sell and deliver electricity that is in excess of Project Use (power required for project operations), which for the Sierra Nevada Region is generated from CVP and Washoe Project powerplants. Western's power marketing responsibility includes managing the Federal transmission system. The hydroelectric generation facilities of the CVP are operated by the Bureau of Reclamation (Reclamation). Reclamation manages and releases water in accordance with the various acts authorizing specific projects and with other laws and enabling legislation. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by Reclamation, the U.S. Fish and Wildlife Service (the Service), or other regulatory agencies, acting in accordance with law or policy. This EIS describes the environmental consequences of the range of reasonable marketing alternatives that meet the needs and purposes of the proposed marketing plan

  11. Long expansion planning of electrical power availability in Brazil under the real options theoretical approach; Planejamento de longo prazo da expansao da oferta de energia eletrica no Brasil sob uma perspectiva da teoria das opcoes reais

    Energy Technology Data Exchange (ETDEWEB)

    Marreco, Juliana de Moraes

    2007-05-15

    This thesis considers uncertainty on the long term generation expansion planning in the Brazilian Electric System, under a Real Options Approach . First, Real Options Theory is used to demonstrate the importance of thermo power plants insertion in Brazil, through a flexibility valuation on hydrothermal system. This is the first objective of this thesis. In the second part a Real Options Model is proposed to support long term expansion studies, based in a levelized costs analysis. The adequacy of proposed models to real problem is illustrated by a case study of the Brazilian Power System. The results show the importance of the energetic matrix diversification on the Long Term Planning. In the expansion model proposed, results are in favor of higher participation of biomass, nuclear power and coal in Brazilian electricity generation matrix. (author)

  12. International and Domestic Development Trends of Electromagnetic Transient Analysis Programs for Power Systems

    Science.gov (United States)

    Noda, Taku

    Nowadays, there is quite high demand for electromagnetic transient (EMT) analysis programs and real-time simulators for power systems. In addition to the conventional demand such as overvoltage, over-current and oscillation simulations, the new demand that includes simulations of power-electronics circuits and power quality is increasing. With this background, development groups of EMT programs and real-time simulators have made progress in terms of computational performance and user experience. In Japan, Central Research Institute of Electric Power Industry has newly developed an EMT analysis program called XTAP (eXpandable Transient Analysis Program). This article overviews these international and domestic development trends of EMT analysis programs and real-time simulators.

  13. From Market Uncertainty to Policy Uncertainty for Investment in Power Generation: Real Options for NPP on Electricity Market

    International Nuclear Information System (INIS)

    Tomsic, Zeljko

    2014-01-01

    In the electricity sector, market participants must make decisions about capacity choice in a situation of radical uncertainty about future market conditions. Sector is normally characterised by non-storability and periodic and stochastic demand fluctuations. In these cases capacity determination is a decision for the long term, whereas production is adjusted in the short run. Capacities need to be installed well in advance (decision for investment even earlier because of long construction time and even longer in case of NPP to prepare all needed legal, financial and physical infrastructure), at times when firms face considerable demand and cost uncertainty when choosing their capacity. Paper looks on the main contributions in investment planning under uncertainty, in particular in the electricity market for capital intensive investments like NPP. The relationship between market and non-market factors (recent UK policy example) in determining investment signals in competitive electricity markets was analysed. Paper analyse the ability of competitive electricity markets to deliver the desired quantity and type of generation capacity and also investigates the variety of market imperfections operating in electricity generation and their impact on long-term dynamics for generation capacity, the most capital-intensive of the liberalised functions in the electricity supply industry. Paper analyses how price formation influences investment signals. Today, investment decisions are made by several operators that act independently. Number of factors (including market power, wholesale price volatility, lack of liquidity in the wholesale and financial market, policy and regulatory risks etc.) contribute to polluting the price signal and generating sub-optimal behaviour. Climate change policies can easily distort market signals, insulating renewables generation from market dynamics. This in turn reduces the proportion of the market that is effectively opened to competitive

  14. Options Study - Phase II

    Energy Technology Data Exchange (ETDEWEB)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2010-09-01

    The Options Study has been conducted for the purpose of evaluating the potential of alternative integrated nuclear fuel cycle options to favorably address the issues associated with a continuing or expanding use of nuclear power in the United States. The study produced information that can be used to inform decisions identifying potential directions for research and development on such fuel cycle options. An integrated nuclear fuel cycle option is defined in this study as including all aspects of the entire nuclear fuel cycle, from obtaining natural resources for fuel to the ultimate disposal of used nuclear fuel (UNF) or radioactive wastes. Issues such as nuclear waste management, especially the increasing inventory of used nuclear fuel, the current uncertainty about used fuel disposal, and the risk of nuclear weapons proliferation have contributed to the reluctance to expand the use of nuclear power, even though it is recognized that nuclear power is a safe and reliable method of producing electricity. In this Options Study, current, evolutionary, and revolutionary nuclear energy options were all considered, including the use of uranium and thorium, and both once-through and recycle approaches. Available information has been collected and reviewed in order to evaluate the ability of an option to clearly address the challenges associated with the current implementation and potential expansion of commercial nuclear power in the United States. This Options Study is a comprehensive consideration and review of fuel cycle and technology options, including those for disposal, and is not constrained by any limitations that may be imposed by economics, technical maturity, past policy, or speculated future conditions. This Phase II report is intended to be used in conjunction with the Phase I report, and much information in that report is not repeated here, although some information has been updated to reflect recent developments. The focus in this Options Study was to

  15. Shippingport Atomic Power Station decommissioning program and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F P; Skavdahl, R E

    1985-01-01

    The Shippingport Station decommissioning project is the first decommissioning of a large scale nuclear power plant, and also the first nuclear power plant to be decommissioned which has continued the power operation as long as 25 years. The nuclear facilities which have been decommissioned so far have operated for shorter period and were small as compared with commercial power reactors, but the experience gained by those decommissionings as well as that gained by nuclear plant maintenance and modification has helped to establish the technology and cost basis for Shippingport and future decommissioning projects. In this paper, the current status of the preparation being made by the General Electric Co., its subcontractor and the US Department of Energy for starting the decommissioning phase of the Shippingport Atomic Power Station is described. Also remote metal cutting, decontamination, concrete removal, the volume reduction of liquids and solids and robotics which will be applied to the project are discussed. The Shippingport Station is a 72 MWe PWR plant having started operation in 1957, and permanently shut down in 1982, after having generated over 7.4 billion kWh of electricity.

  16. Status and development of nuclear power program in Korea

    International Nuclear Information System (INIS)

    Choi, C.T.

    1991-01-01

    The low availability in Korea of indigenous energy resources in the forms of water power and coal, and the oil squeeze in the seventies, have caused nuclear power to be expanded into the country's main primary energy source. Nine nuclear generating units with a cumulated power of 7616 MWe have been commissioned since 1978 and now contribute 36.2% to the power generating capacity of the country. In 1990, the nine nuclear plants converted 52.9 TWh of nuclear power into electricity, thus covering some 50% of the Korean electricity supply, as already in 1989. In the past three years, the electricity requirement rose by an annual 13.7%. In the light of a forecast continued rise by 5% to 8% annually up until 2006, the nuclear generating capacity then installed would have to be 23 229 MWe, which would be some 40% of the total generating capacity required. Under the long term energy plan of the Korean Energy Ministry, nine new nuclear generating units with an aggregate 8100 MWe will be built by 2001, and another nine units by the year 2006. (orig.) [de

  17. The power of engagement: implementation of a career ladder program.

    Science.gov (United States)

    Bourgeault, Robert; Newmark, Jason

    2012-01-01

    At Baystate Health in Massachusetts, the development and implementation of a career ladder program was implemented to reduce turnover and to improve employee satisfaction, morale, and recruitment efforts. There was significant initial expenditure in the program, as a result of promoting the large number of employees with significant experience and seniority. A smaller number of staff are expected to apply for advancement during successive cycles, allowing for decreased incremental expense going forward. Critical to the success of the program was understanding the time commitment, getting senior organizational support and staff buy-in, and justifying the associated expenses. The development and initiation of the program has done much to support a positive work environment with increased morale and higher performance among significant numbers of staff at all levels.

  18. Examples of digital simulation of AC-DC power converter with the Electromagnetic Transients Program

    International Nuclear Information System (INIS)

    Tanahashi, Shugo; Yamada, Shuichi; Mugishima, Mituo; Kitagawa, Shiro.

    1989-03-01

    This article gives a practical guidance for analysis of power converter circuits using the Electromagnetic Transients Program (EMTP). First how to use the program is shown with two simple examples; (1) a power supply with three-phase diode bridge and (2) a feedback system for current control. Then its application to more complicated system is shown with an example of a power supply for Compact Helical System (CHS), where a hybrid power supply with multi-phase diode and thyristor bridges, and two three-phase thyristor converters are driven by an AC generator. (author)

  19. PAVAN: an atmospheric-dispersion program for evaluating design-basis accidental releases of radioactive materials from nuclear power stations

    International Nuclear Information System (INIS)

    Bander, T.J.

    1982-11-01

    This report provides a user's guide for the NRC computer program, PAVAN, which is a program used by the US Nuclear Regulatory Commission to estimate downwind ground-level air concentrations for potential accidental releases of radioactive material from nuclear facilities. Such an assessment is required by 10 CFR Part 100 and 10 CFR Part 50. The program implements the guidance provided in Regulatory Guide 1.145, Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants. Using joint frequency distributions of wind direction and wind speed by atmospheric stability, the program provides relative air concentration (X/Q) values as functions of direction for various time periods at the exclusion area boundary (EAB) and the outer boundary of the low population zone (LPZ). Calculations of X/Q values can be made for assumed ground-level releases (e.g., through building penetrations and vents) or elevated releases from free-standing stacks. Various options may be selected by the user. They can account for variation in the location of release points, additional plume dispersion due to building wakes, plume meander under low wind speed conditions, and adjustments to consider non-straight trajectories. It computes an effective plume height using the physical release height which can be reduced by inputted terrain features. It cannot handle multiple emission sources. A description of the main program and all subroutines is provided. Also included as appendices are a complete listing of the program and two test cases with the required data inputs and the resulting program outputs

  20. Management of National Nuclear Power Programs for assured safety

    International Nuclear Information System (INIS)

    Connolly, T.J.

    1985-01-01

    Topics discussed in this report include: nuclear utility organization; before the Florida Public Service Commission in re: St. Lucie Unit No. 2 cost recovery; nuclear reliability improvement and safety operations; nuclear utility management; training of nuclear facility personnel; US experience in key areas of nuclear safety; the US Nuclear Regulatory Commission - function and process; regulatory considerations of the risk of nuclear power plants; overview of the processes of reliability and risk management; management significance of risk analysis; international and domestic institutional issues for peaceful nuclear uses; the role of the Institute of Nuclear Power Operations (INPO); and nuclear safety activities of the International Atomic Energy Agency (IAEA)

  1. Management of National Nuclear Power Programs for assured safety

    Energy Technology Data Exchange (ETDEWEB)

    Connolly, T.J. (ed.)

    1985-01-01

    Topics discussed in this report include: nuclear utility organization; before the Florida Public Service Commission in re: St. Lucie Unit No. 2 cost recovery; nuclear reliability improvement and safety operations; nuclear utility management; training of nuclear facility personnel; US experience in key areas of nuclear safety; the US Nuclear Regulatory Commission - function and process; regulatory considerations of the risk of nuclear power plants; overview of the processes of reliability and risk management; management significance of risk analysis; international and domestic institutional issues for peaceful nuclear uses; the role of the Institute of Nuclear Power Operations (INPO); and nuclear safety activities of the International Atomic Energy Agency (IAEA).

  2. Ratepayer-funded energy-efficiency programs in a restructuredelectri city industry: Issues and options for regulators andlegislators

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph; Goldman, Charles; Nadel, Stephen

    1998-05-01

    Electric industry restructuring requires state regulators and legislators to re-examine the purposes served by and the continuing need for ratepayer-funded energy-efficiency programs, as well as the mechanisms to collect funds for these programs and the institutions appropriate to administer them. This paper offers background to these issues and a series of recommendations based on analysis of recent state experiences. Our recommendations are summarized.

  3. City of Camden, New Jersey Program offering widespread energy recovery (power): Final report

    Energy Technology Data Exchange (ETDEWEB)

    Witkowski, Stanley [City of Camden, NJ (United States). Dept. of Development and Planning Bureau of Housing Services

    2013-12-31

    The Camden Residential POWER Program, Program Offering Widespread Energy Recovery, is a program designed to benefit Camden homeowners, stabilize neighborhoods and put local contractors to work. Camden POWER granted up to $18,600 to fund energy efficient home improvements and necessary life/safety rehabilitation repairs. The program was designed as a self-sustaining, neighborhood approach to bringing long-term energy and financial savings to the community. Valuable home upgrades were completed, including high-efficiency furnaces, hot water heaters, insulation, insulated roofs and blower door guided air-sealing. The goal of all improvements were to reduce energy consumption, lower utility bills, improve property values and promote neighborhood stabilization.

  4. Stochastic Robust Mathematical Programming Model for Power System Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Cong; Changhyeok, Lee; Haoyong, Chen; Mehrotra, Sanjay

    2016-01-01

    This paper presents a stochastic robust framework for two-stage power system optimization problems with uncertainty. The model optimizes the probabilistic expectation of different worst-case scenarios with ifferent uncertainty sets. A case study of unit commitment shows the effectiveness of the proposed model and algorithms.

  5. The duty health physicist program at Byron Nuclear Power Station

    International Nuclear Information System (INIS)

    Goldsmith, D.G.; Carey, T.R.

    1987-01-01

    The Duty Health Physicist Program at Byron Station was established to deal with routine health physics tasks and provide an interface between frontline and upper radiation-chemistry management. The program consists of a weekly rotation of selected members of the health physics staff into the duty health physicist position to handle the assigned duty tasks. The tasks include, but are not limited to, daily isotopic and air sample review, effluent release package review, maximum permissible concentration calculations, dose approvals, as-low-as-reasonably-achievable action review of pending jobs, and general availability to answer questions and address problems in health-physics-related areas of plant operation. The daily attendance of the duty health physicist at the radiation-chemistry and station plan-of-the-day meetings has increased the overall presence and visibility of the health physics program to upper station management and other station departments. Since its inception in July of 1985, the Duty Health Physics Program has been a major contributor to the observed 50% reduction in reportable personnel errors in the radiation-chemistry department (based on personnel-error-related deviation reports and license event reports generated on the radiation-chemistry department at Byron Station). Although difficulty to quantify, other important benefits of this program are also discussed in this paper

  6. Japan's international cooperation programs on seismic safety of nuclear power plants

    International Nuclear Information System (INIS)

    Sanada, Akira

    1997-01-01

    MITI is promoting many international cooperation programs on nuclear safety area. The seismic safety of nuclear power plants (NPPs) is a one of most important cooperation areas. Experts from MITI and related organization join the multilateral cooperation programs carried out by international organization such as IAEA, OECD/NEA etc. MITI is also promoting bilateral cooperation programs such as information exchange meetings, training programs and seminars on nuclear safety with several countries. Concerning to the cooperation programs on seismic safety of NPPs such as information exchange and training, MITI shall continue and expand these programs. (J.P.N.)

  7. Japan`s international cooperation programs on seismic safety of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Sanada, Akira [Agency of Natural Resources and Energy, Tokyo (Japan)

    1997-03-01

    MITI is promoting many international cooperation programs on nuclear safety area. The seismic safety of nuclear power plants (NPPs) is a one of most important cooperation areas. Experts from MITI and related organization join the multilateral cooperation programs carried out by international organization such as IAEA, OECD/NEA etc. MITI is also promoting bilateral cooperation programs such as information exchange meetings, training programs and seminars on nuclear safety with several countries. Concerning to the cooperation programs on seismic safety of NPPs such as information exchange and training, MITI shall continue and expand these programs. (J.P.N.)

  8. Non-advertising program in promoting nuclear power in Finland

    International Nuclear Information System (INIS)

    Ruuskanen, Antti

    1989-01-01

    In Finland, there are two nuclear power plants with four reactors totalling about 2 200 MWe. The oldest reactor has been operating just over ten years. In the Finnish power supply the share of nuclear power makes up one third. The optimum would be about 40%. Based on energy and nuclear attitude surveys showed that these issues are not independent in the society. Quite the opposite, the nuclear attitudes especially are tightly connected to general views like the pessimism toward the future, the credibility of large institutions, or politics, the acceptability of continuous economic growth, etc. The role of technical or economic facts, we engineers love, is found to be small, too. To change people's nuclear attitude one should be able to influence all the complex issues related to nuclear power. In theory, this is possible by ads. In that case the campaigning ought to be huge, it should last for years, and still would have basic question marks. The first question is how credible people see ads, in general, and, especially, in case of highly disputed and societal issues. Although there have been some educational ad campaigns in Finland, nuclear campaign would be a step to the unknown. Knowing that the nuclear attitudes are tightly connected to very many and quite stable societal views, and seeing the basic difficulties with ads, it is clear to me that there is no other way of promoting nuclear energy than a long and continuous public debate involving. Referring to the nuclear attitude survey results in Finland, advertising is not the solution to win the public confidence. Nuclear industry must be active in other ways than promoting nuclear power by advertising. This was the Finnish opinion. The nuclear issue is national in the sense that no country can copy models from other countries without carefully considering the local circumstances. So, in other countries there may be situations where other kinds of actions are called for

  9. Non-advertising program in promoting nuclear power in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Ruuskanen, Antti [Department of Information, Imatran Voima Oy (IVO) (Finland)

    1989-07-01

    In Finland, there are two nuclear power plants with four reactors totalling about 2 200 MWe. The oldest reactor has been operating just over ten years. In the Finnish power supply the share of nuclear power makes up one third. The optimum would be about 40%. Based on energy and nuclear attitude surveys showed that these issues are not independent in the society. Quite the opposite, the nuclear attitudes especially are tightly connected to general views like the pessimism toward the future, the credibility of large institutions, or politics, the acceptability of continuous economic growth, etc. The role of technical or economic facts, we engineers love, is found to be small, too. To change people's nuclear attitude one should be able to influence all the complex issues related to nuclear power. In theory, this is possible by ads. In that case the campaigning ought to be huge, it should last for years, and still would have basic question marks. The first question is how credible people see ads, in general, and, especially, in case of highly disputed and societal issues. Although there have been some educational ad campaigns in Finland, nuclear campaign would be a step to the unknown. Knowing that the nuclear attitudes are tightly connected to very many and quite stable societal views, and seeing the basic difficulties with ads, it is clear to me that there is no other way of promoting nuclear energy than a long and continuous public debate involving. Referring to the nuclear attitude survey results in Finland, advertising is not the solution to win the public confidence. Nuclear industry must be active in other ways than promoting nuclear power by advertising. This was the Finnish opinion. The nuclear issue is national in the sense that no country can copy models from other countries without carefully considering the local circumstances. So, in other countries there may be situations where other kinds of actions are called for.

  10. Polish Toxic Currency Options

    Directory of Open Access Journals (Sweden)

    Waldemar Gontarski

    2009-06-01

    Full Text Available Toxic currency options are defined on the basis of the opposition to the nature (essence of an option contract, which is justified in terms of norms founded on the general law clause of characteristics (nature of a relation (which represents an independent premise for imposing restrictions on the freedom of contracts. So-understood toxic currency options are unlawful. Indeed they contravene iuris cogentis regulations. These include for instance option contracts, which are concluded with a bank, if the bank has not informed about option risk before concluding the contract; or the barrier options, which focus only on the protection of bank’s interests. Therefore, such options may appear to be invalid. Therefore, performing contracts for toxic currency options may be qualified as a criminal mismanagement. For the sake of security, the manager should then take into consideration filing a claim for stating invalidity (which can be made in a court verdict. At the same time, if the supervisory board member in a commercial company, who can also be a subject to mismanagement offences, commits an omission involving lack of reaction (for example, if he/she fails to notify of the suspected offence committed by the management board members acting to the company’s detriment when the management board makes the company conclude option contracts which are charged with absolute invalidity the supervisory board member so acting may be considered to act to the company’s detriment. In the most recent Polish jurisprudence and judicature the standard of a “good host” is treated to be the last resort for determining whether the manager’s powers resulting from criminal regulations were performed. The manager of the exporter should not, as a rule, issue any options. Issuing options always means assuming an obligation. In the case of currency put options it is an absolute obligation to purchase a given amount in euro at exchange rate set in advance. On the

  11. Nuclear option

    Energy Technology Data Exchange (ETDEWEB)

    Kemm, K R

    1978-05-01

    The global outlook is that nuclear reactors are here to stay and South Africa has already entered the nuclear power stakes. This article discusses the rocketing oil prices, and the alternatives that can be used in power generation, the good safety record of the nuclear industry and the effect that South Africa's first nuclear power station should have on the environment.

  12. Evaluating the Impact of Zimbabwe's Prevention of Mother-to-Child HIV Transmission Program: Population-Level Estimates of HIV-Free Infant Survival Pre-Option A.

    Science.gov (United States)

    Buzdugan, Raluca; McCoy, Sandra I; Watadzaushe, Constancia; Kang Dufour, Mi-Suk; Petersen, Maya; Dirawo, Jeffrey; Mushavi, Angela; Mujuru, Hilda Angela; Mahomva, Agnes; Musarandega, Reuben; Hakobyan, Anna; Mugurungi, Owen; Cowan, Frances M; Padian, Nancy S

    2015-01-01

    We estimated HIV-free infant survival and mother-to-child HIV transmission (MTCT) rates in Zimbabwe, some of the first community-based estimates from a UNAIDS priority country. In 2012 we surveyed mother-infant pairs residing in the catchment areas of 157 health facilities randomly selected from 5 of 10 provinces in Zimbabwe. Enrolled infants were born 9-18 months before the survey. We collected questionnaires, blood samples for HIV testing, and verbal autopsies for deceased mothers/infants. Estimates were assessed among i) all HIV-exposed infants, as part of an impact evaluation of Option A of the 2010 WHO guidelines (rolled out in Zimbabwe in 2011), and ii) the subgroup of infants unexposed to Option A. We compared province-level MTCT rates measured among women in the community with MTCT rates measured using program monitoring data from facilities serving those communities. Among 8568 women with known HIV serostatus, 1107 (12.9%) were HIV-infected. Among all HIV-exposed infants, HIV-free infant survival was 90.9% (95% confidence interval (CI): 88.7-92.7) and MTCT was 8.8% (95% CI: 6.9-11.1). Sixty-six percent of HIV-exposed infants were still breastfeeding. Among the 762 infants born before Option A was implemented, 90.5% (95% CI: 88.1-92.5) were alive and HIV-uninfected at 9-18 months of age, and 9.1% (95%CI: 7.1-11.7) were HIV-infected. In four provinces, the community-based MTCT rate was higher than the facility-based MTCT rate. In Harare, the community and facility-based rates were 6.0% and 9.1%, respectively. By 2012 Zimbabwe had made substantial progress towards the elimination of MTCT. Our HIV-free infant survival and MTCT estimates capture HIV transmissions during pregnancy, delivery and breastfeeding regardless of whether or not mothers accessed health services. These estimates also provide a baseline against which to measure the impact of Option A guidelines (and subsequently Option B+).

  13. 2014 Water Power Program Peer Review: Marine and Hydrokinetic Technologies, Compiled Presentations (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    2014-02-01

    This document represents a collection of all presentations given during the EERE Wind and Water Power Program's 2014 Marine and Hydrokinetic Peer Review. The purpose of the meeting was to evaluate DOE-funded hydropower and marine and hydrokinetic R&D projects for their contribution to the mission and goals of the Water Power Program and to assess progress made against stated objectives.

  14. The program of reactors and nuclear power plants; Programa de reactores y centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Calabrese, Carlos R [Comision Nacional de Energia Atomica, General San Martin (Argentina). Centro Atomico Constituyentes

    2001-07-01

    Into de framework of the program of research reactors and nuclear power plants, the operating Argentine reactors are described. The uses of the research reactors in Argentina are summarized. The reactors installed by Argentina in other countries (Peru, Algeria, Egypt) are briefly described. The CAREM project for the design and construction of an innovator small power reactor (27 MWe) is also described in some detail. The next biennial research and development program for reactor is briefly outlined.

  15. 2014 Water Power Program Peer Review: Hydropower Technologies, Compiled Presentations (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    2014-02-01

    This document represents a collection of all presentations given during the EERE Wind and Water Power Program's 2014 Hydropower Peer Review. The purpose of the meeting was to evaluate DOE-funded hydropower and marine and hydrokinetic R&D projects for their contribution to the mission and goals of the Water Power Program and to assess progress made against stated objectives.

  16. Scylla, Charaybdis, and the U.S. Nuclear Power Program

    International Nuclear Information System (INIS)

    Dragoumis, P.

    1976-01-01

    Like the Odysseus of Greek mythology, nuclear energy and therefore the energy security of the United States, is making a difficult passage through a strait lined with hazards. On one side is Scylla, the monster/rock hazard representing fear of nuclear power for its accident and proliferation risks. On the other side is Charybdis, a dangerous whirlpool characterizing the confusion and nuclear expansion-inhibiting uncertainty, created by inconsistent, unpredictable regulation, questions respecting international controls, closing the fuel cycle, enrichment, etc. Given the vital national U.S. stake in nuclear power, solutions to the problems inhibiting nuclear expansion must and will be found. While solutions are expected, acceleration of efforts is needed to assure a safe national course through the hazardous straits to U.S. energy security based on domestic sources

  17. 2004 Power marketing program. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    The Sierra Nevada Region proposes to develop a marketing plan that would be implemented in the year 2005 and to allocate power to eligible entities within its marketing area in northern and central California and Nevada. Four alternatives were analyzed that are structured around the range of operations of the Central Valley Project hydroelectric system, levels of power purchases, and customer group allocations. The manner in which hydropower generating plants are operated is one of the fundamental differences across the alternatives. Operating the hydrosystem to provide peaking power (the maximize hydropower peaking alternative, which is similar to the no-action alternative), would provide up to 94 t MW of additional load-carrying capacity in comparison to baseload operations of the CVP system (the baseload alternative). Although it is not possible to determine where or when any lost capacity would be made up, building replacement capacity in response to the baseload alternative would result in land-use impacts and the use of natural and financial resources. Peaking also results in small but beneficial regional economic effects. Peaking and baseload alternatives result in different hourly air emission patterns. The peaking alternative results in annual reductions in air pollution and wastewater. Impacts within the CVP are limited to regulating reservoirs, which would have reduced pool-level fluctuations under the baseload alternative. The regional economic effects of the Sierra Nevada Region's power purchases are small regardless of CVP operations and depend on their quantity and whether they are firm or economy purchases. Changes in allocations co customer groups result in small regional effects that are dependent on assumptions made about customer access to wholesale energy markets

  18. Fusion Power Program biannual progress report, April-September 1979

    International Nuclear Information System (INIS)

    1980-02-01

    This biannual report summarizes the Argonne National Laboratory work performed for the Office of Fusion Energy during the April-September 1979 quarter in the following research and development areas: materials; energy storage and transfer; tritium containment, recovery and control; advanced reactor design; atomic data; reactor safety; fusion-fission hybrid systems; alternate applications of fusion energy; and other work related to fusion power. Separate abstracts were prepared for three sections

  19. Planning the nuclear contribution to the Brazilian power program

    International Nuclear Information System (INIS)

    Barbalho, A. Rodrigues; Alves, R. Nazare; Pinto, C. Syllus M.; Souza Santos, T.D. de; Abrao, A.

    1977-01-01

    The thermo-electric power in Brazil accounts for less than 20% of the total generating capacity. Brazil's power is essentially generated hydraulically, which grants the growing development. The electric energy consumption keeps growing, with the annual average rate of 13%/year in the last five years. The present installed capacity is 20 000 MWe and the projections are: 35 000MWe, in 1980; 50 000 MWe in 1985; 75 000 MWe, in 1990 and 150 000 MWe, in 2 000. Most of the hydraulic resources are located in remote areas of the country, very far from the consumption centers. Under the agreement between the Federal Republic of Germany and Brazil (signed in June 1975), besides the nuclear power station, American made, under construction in Agra dos Reis, with a power capacity of 626 MWe, two more units, each one with 1 300 MWe capacity are to be erected at the same site, and planned to be in operation in 1982 and 1983. Several joint German-Brazilian companies will be established for reactor and fuel manufacture, in the country. The Brazilian state holding nuclear company, Empresas Nucleares Brasileiras S/A., NUCLEBRAS, will participate in the formation of all joint companies with at least 51% of capital investments. The Brazilian Government will spend 10 billion dollars (U.S.), during the agreement's duration, to make its industry stronger, to develop its technology and to reduce its dependence on energy imports. Brazil's target: full independence in nuclear technology (including reactor manufacture and complete fuel cycle) in about 15 years [es

  20. Electrical Power Systems for NASA's Space Transportation Program

    Science.gov (United States)

    Lollar, Louis F.; Maus, Louis C.

    1998-01-01

    Marshall Space Flight Center (MSFC) is the National Aeronautics and Space Administration's (NASA) lead center for space transportation systems development. These systems include earth to orbit launch vehicles, as well as vehicles for orbital transfer and deep space missions. The tasks for these systems include research, technology maturation, design, development, and integration of space transportation and propulsion systems. One of the key elements in any transportation system is the electrical power system (EPS). Every transportation system has to have some form of electrical power and the EPS for each of these systems tends to be as varied and unique as the missions they are supporting. The Preliminary Design Office (PD) at MSFC is tasked to perform feasibility analyses and preliminary design studies for new projects, particularly in the space transportation systems area. All major subsystems, including electrical power, are included in each of these studies. Three example systems being evaluated in PD at this time are the Liquid Fly Back Booster (LFBB) system, the Human Mission to Mars (HMM) study, and a tether based flight experiment called the Propulsive Small Expendable Deployer System (ProSEDS). These three systems are in various stages of definition in the study phase.

  1. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  2. The development of the Chinese nuclear power program

    International Nuclear Information System (INIS)

    Tournyol du Clos, A.

    2009-01-01

    The electricity production is steadily growing in China and the intense use of coal has led to various problems such as -) important contamination of urban areas, -) safety concerns in coal mines, and -) coal transport as the production regions are not the consumption regions. In 2004, Chinese authorities decided to accelerate the recourse to nuclear power. The main measures that were adopted followed: -) the development of the CPR1000 that is a Chinese improved version of the Areva 900 MW PWR; -) the development of a Chinese third generation reactor based on foreign design: 4 AP1000 and 2 EPR have been ordered; -) the adoption of a closed cycle for the fuel; -) the participation to international collaborations like GIF (Generation 4 International Forum) and to ITER. Today the number of operating power reactors in China is 11 and 26 have been ordered. The objective is to reach a share of 20% for nuclear power in the electricity production which means 250 GW installed by 2050. It appears that the nuclear renaissance has begun in Asia and real opportunities for the European nuclear industry are there. (A.C.)

  3. The summary of the fundamental power development program for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1982-01-01

    The Power Source Development Coordination Council put tentatively the target of starting construction in fiscal 1981 at hydraulic 1,000 MW, thermal 5,000 MW and nuclear 5,000 MW, totaling 11,000 MW. Subsequently, after the coordination among the ministries and agencies concerned, the following development program was formally decided for fiscal 1981: hydraulic power 290 MW at 22 sites, thermal power 5,480 MW at 9 sites and nuclear power 1,980 MW at two sites, totaling 7,750 MW at 33 sites. This is 70 % of the tentative target. Nuclear power generation thus put in the fundamental power development program was: one BWR unit of 825 MW in Maki, Niigata Prefecture (Tohoku Electric), and two PWR units of 579 MW each in Kyowa-Tomari in Hokkaido (Hokkaido Electric). (J.P.N.)

  4. Superconductivity Program for electric power systems: 1994 annual PEER review. Volume 1, Meeting proceedings

    International Nuclear Information System (INIS)

    1994-01-01

    This is Volume I of information presented at the Annual Peer Review of the Superconductivity Program For Electric Power Systems. Topics include: Wire development; powder synthesis; characterization of superconducting materials; electric power applications; magnetic refrigerators; and motor cooling issues. Individual reports were processed separately for the database

  5. Quality assurance program manual for nuclear power plants. Volume I. Policies

    International Nuclear Information System (INIS)

    1976-01-01

    The Consumers Power Company Quality Assurance Program Manual for Nuclear Power Plants consists of policies and procedures which comply with current NRC regulatory requirements and industry codes and standards in effect during the design, procurement, construction, testing, operation, refueling, maintenance, repair and modification activities associated with nuclear power plants. Specific NRC and industry documents that contain the requirements, including the issue dates in effect, are identified in each nuclear power plant's Safety Analysis Report. The requirements established by these documents form the basis for the Consumer Power Quality Assurance Program, which is implemented to control those structures, systems, components and operational safety actions listed in each nuclear power plant's Quality List (Q-List). As additional and revised requirements are issued by the NRC and professional organizations involved in nuclear activities, they will be reviewed for their impact on this manual, and changes will be made where considered necessary. CP Co 1--Consumers Power Company QA Program Topical Report is Volume I of this manual and contains Quality Assurance Program Policies applicable during all phases of nuclear power plant design, construction and operation

  6. 78 FR 35330 - Initial Test Programs for Water-Cooled Nuclear Power Plants

    Science.gov (United States)

    2013-06-12

    ... Plants AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide; issuance. SUMMARY: The U.S... Programs for Water-Cooled Nuclear Power Plants.'' This guide describes the general scope and depth that the... power plants. ADDRESSES: Please refer to Docket ID NRC-2012-0293 about the availability of information...

  7. 77 FR 73056 - Initial Test Programs for Water-Cooled Nuclear Power Plants

    Science.gov (United States)

    2012-12-07

    ... Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for comment... (DG), DG-1259, ``Initial Test Programs for Water-Cooled Nuclear Power Plants.'' This guide describes... (ITPs) for light water cooled nuclear power plants. DATES: Submit comments by January 31, 2013. Comments...

  8. Adaptation and Re-Use of Spacecraft Power System Models for the Constellation Program

    Science.gov (United States)

    Hojnicki, Jeffrey S.; Kerslake, Thomas W.; Ayres, Mark; Han, Augustina H.; Adamson, Adrian M.

    2008-01-01

    NASA's Constellation Program is embarking on a new era of space exploration, returning to the Moon and beyond. The Constellation architecture will consist of a number of new spacecraft elements, including the Orion crew exploration vehicle, the Altair lunar lander, and the Ares family of launch vehicles. Each of these new spacecraft elements will need an electric power system, and those power systems will need to be designed to fulfill unique mission objectives and to survive the unique environments encountered on a lunar exploration mission. As with any new spacecraft power system development, preliminary design work will rely heavily on analysis to select the proper power technologies, size the power system components, and predict the system performance throughout the required mission profile. Constellation projects have the advantage of leveraging power system modeling developments from other recent programs such as the International Space Station (ISS) and the Mars Exploration Program. These programs have developed mature power system modeling tools, which can be quickly modified to meet the unique needs of Constellation, and thus provide a rapid capability for detailed power system modeling that otherwise would not exist.

  9. The Use of Nanomaterials to Achieve NASA's Exploration Program Power Goals

    Science.gov (United States)

    Jeevarajan, J.

    2009-01-01

    This slide presentation reviews the power requirements for the space exploration and the lunar surface mobility programs. It includes information about the specifications for high energy batteries and the power requirements for lunar rovers, lunar outposts, lunar ascent module, and the lunar EVA suit.

  10. Meteorological monitoring Program in the location to the Juragua Nuclear Power Plant

    International Nuclear Information System (INIS)

    Linares Gonzalez, M.E.; Ramos Biltres, E.O.; Prendes Alonso, M.

    1998-01-01

    The objective gives the work it is to present the meteorological Monitoring program in the Juragua nuclear power plant, which you makes according to the standards settled down by the OIEA, the standards give the World meteorological organization and the demands to the content and elaboration gives the Nuclear Power Plant security documents DTN-1.03.91

  11. Taipower's philosophy and practices for management of its nuclear power development program

    International Nuclear Information System (INIS)

    Chu, D.S.L.

    1985-01-01

    Taipower has been considered successful in nuclear power development and utilization in recent years. This paper presents Taipower's philosophy and practices in managing its nuclear power program with respect to management participation, personnel training, planning, design and construction, operation and maintenance, and the fuel cycle

  12. Environmental Radiological Impact of Nuclear Power. Monitoring and Control Programs

    International Nuclear Information System (INIS)

    Ramos, L. M.

    2000-01-01

    Radioactive contamination of the environment and public exposure to ionizing radiation may result from releases from programmed or accidental operations in regulated activities, or they may be due to preexisting situations such as contamination caused by past accidents, radioactive rain caused by nuclear tests, or increased natural radioactivity resulting from human activities. In many cases, both the emission sources and the environment should be monitored to determine the risk to the population and verify to what extent the limits and conditions established by competent authorities are being observed. Monitoring can be divided into three categories: monitoring of the emission source, of the receiving medium and of members of the public; individual monitoring of the population is extremely rare and would only be considered when estimated doses substantially exceed the annual public dose limit. In practices likely to produce significant radioactive releases, as is the case of nuclear fuel cycle facilities, the limits and conditions for monitoring and controlling them and the requirements for environmental radiological monitoring are established in the licensing process. Programs implemented during normal operation of the facilities form the basis for monitoring in the event of accidents. in addition to environmental radiological monitoring associated with facilities, different countries have monitoring programs outside the facilities zones of influence, in order to ascertain the nationwide radiological fund and determine possible increases in this fund. In Spain, the facilities that generate radioactive waste have effluent storage, treatment and removal systems and radiological monitoring programs based on site and discharge characteristics. The environmental radiological monitoring system is composed of the network implemented by the owners in the nuclear fuel cycle facilities zones of influence, and by nationwide monitoring networks managed by the Consejo de

  13. Dedicating new real estate transfer taxes for energy efficiency: A revenue option for scaling up Green Retrofit Programs

    International Nuclear Information System (INIS)

    Lester, T. William

    2013-01-01

    As the labor market in the U.S. remains weak, with high unemployment and sluggish job growth, policymakers at various levels of government are looking for new ways to support job growth and investment during an increasingly tight fiscal climate. Policies that promote the “Green Economy” in general and energy efficiency in particular remain politically popular as potential win–win solutions that will create jobs and curb greenhouse gas emissions. Yet, efforts to promote energy efficiency in the residential sector through rebates and incentives alone have yet to reach critical mass. This paper outlines a policy option for state and local governments to use real estate transfer taxes to generate stronger incentives for home buyers to undertake significant retrofit projects at the time of sale. The economic impact of the proposed energy efficiency transfer tax (EETT) is then modeled for the State of North Carolina, using standard input–output techniques. Ultimately, based on housing sales figures from 2010, a new EETT of 2.5 percent on home purchases would generate a net positive increase of approximately 3485 direct construction jobs and 5900 annually total jobs for the state. -- Highlights: •Proposes an Energy Efficiency Transfer Tax (EETT) to catalyze residential retrofits. •Models household behavioral response to an EETT. •Estimates induced energy efficiency investment levels in North Carolina. •Calculates net employment impacts of a hypothetical EETT. •Finds net impact of 5900 jobs and over $350 million in additional investment

  14. Healthier options for public schoolchildren program improves weight and blood pressure in 6- to 13-year-olds.

    Science.gov (United States)

    Hollar, Danielle; Messiah, Sarah E; Lopez-Mitnik, Gabriela; Hollar, T Lucas; Almon, Marie; Agatston, Arthur S

    2010-02-01

    Childhood obesity and related health consequences continue to be major clinical and public health issues in the United States. Schools provide an opportunity to implement obesity prevention strategies to large and diverse pediatric audiences. Healthier Options for Public Schoolchildren was a quasiexperimental elementary school-based obesity prevention intervention targeting ethnically diverse 6- to 13-year-olds (kindergarten through sixth grade). Over 2 school years (August 2004 to June 2006), five elementary schools (four intervention, one control, N=2,494, 48% Hispanic) in Osceola County, FL, participated in the study. Intervention components included integrated and replicable nutrition, physical activity, and lifestyle educational curricula matched to state curricula standards; modified school meals, including nutrient-dense items, created by registered dietitians; and parent and staff educational components. Demographic, anthropometric, and blood pressure data were collected at baseline and at three time points over 2 years. Repeated measures analysis showed significantly decreased diastolic blood pressure in girls in the intervention group compared to controls (Padulthood may be prevented. Copyright 2010 American Dietetic Association. Published by Elsevier Inc. All rights reserved.

  15. The Role of Nuclear Power in Slovak Republic; Safety Upgrading Program for WWER Reactors

    International Nuclear Information System (INIS)

    Toth, A.

    1998-01-01

    Implementation of Slovenske elektrarne Production Base Development Program, where all these safety upgrading projects of nuclear power sources at Slovak Republic are included will ensure first of all safety of nuclear power sources on internationally acceptable level, operational reliability of nuclear power units, balanced consumption and production of electric energy in Slovakia and decrease of long term ecological impact in according with international commitments of Slovakia

  16. 76 FR 27062 - Biologics Price Competition and Innovation Act of 2009; Options for a User Fee Program for...

    Science.gov (United States)

    2011-05-10

    ... under the Public Health Service Act (PHS Act). FDA is requesting input on the identified principles for... adhere to these principles, and performance goals for this program. FDA plans to review the comments... drug marketing applications were submitted each year for FDA review. The number of participants in the...

  17. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  18. Fifth parabolic dish solar thermal power program annual review: proceedings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-03-01

    The primary objective of the Review was to present the results of activities within the Parabolic Dish Technology and Module/Systems Development element of the Department of Energy's Solar Thermal Energy Systems Program. The Review consisted of nine technical sessions covering overall Project and Program aspects, Stirling and Brayton module development, concentrator and engine/receiver development, and associated hardware and test results to date; distributed systems operating experience; international dish development activities; and non-DOE-sponsored domestic dish activities. A panel discussion concerning business views of solar electric generation was held. These Proceedings contain the texts of presentations made at the Review, as submitted by their authors at the beginning of the Review; therefore, they may vary slightly from the actual presentations in the technical sessions.

  19. In-core fuel management programs for nuclear power reactors

    International Nuclear Information System (INIS)

    1984-10-01

    In response to the interest shown by Member States, the IAEA organized a co-ordinated research programme to develop and make available in the open domain a set of programs to perform in-core fuel management calculations. This report summarizes the work performed in the context of the CRP. As a result of this programme, complete in-core fuel management packages for three types of reactors, namely PWR's, BWR's and PHWR are now available from the NEA Data Bank. For some reactor types, these program packages are available with three levels of sophistication ranging from simple methods for educational purposes to more comprehensive methods that can be used for reactor design and operation. In addition some operating data have been compiled to allow code validation. (author)

  20. Emergency medical assistance programs for nuclear power reactors

    International Nuclear Information System (INIS)

    Linnemann, R.E.; Mettler, F.A. Jr.

    1977-01-01

    This paper deals with a simple but practical medical support of geographically distributed nuclear reactors in isolated areas. A staff of experts at a centre devote their full attention to accident prevention and preparedness at reactor sites. They establish and maintain emergency medical programs at reactor sites and nearby support hospitals. The emphasis is on first aid and emergency treatment by medical attendants who are not and cannot be experts in radiation but do know how to treat patients. (author)