  1. TQC works in newly-built nuclear power plant and main electric power system plannings

    International Nuclear Information System (INIS)

    Akiyama, Yoshihisa; Kawakatsu, Tadashi; Hashimoto, Yasuo

    1985-01-01

    In the Kansai Electric Power Co., Inc., TQC has been introduced to solve such major problems in nuclear power generation as the securing of nuclear power reliability, the suppression of rises in the costs, the reduction in long periods of power failure and the promotion in siting of nuclear power plants. It is thus employed as a means of the ''creation of a slim and tough business constitution''. The state of activities in Kansai Electric are described in quality assurance of a newly-built nuclear power plant and in raising the reliability of the main electric power system to distribute the generated nuclear power and further the future prospects are explained. (Mori, K.)

  2. Quality control of three main materials for civil construction of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Feng

    2011-01-01

    The construction and operation of nuclear power plant is a systematic engineering. To ensure quality and safety of nuclear power plants, each work from design to operation can have certain impact on the quality and safety of the project. The quality of each related work shall be controlled. Starting from the quality control over raw materials for the civil construction of nuclear power plant, this article mainly analyzes how to control the quality and manage the three main materials of steel, concrete and modular parts in the civil construction. (author)

  3. Main building of the Paks nuclear power plant, Hungary

    International Nuclear Information System (INIS)

    Fejes, A.

    1983-01-01

    The general layout of the main service building of the power plant, the applied building materials as well as the prefabricated structures are described. The conditions of planning and construction are discussed. Novel construction methods under the given conditions were utilized. (author)

  4. THE ANALYSIS OF STRUCTURAL RELIABILITY OF THE MAIN ELECTRIC CONNECTION CIRCUITS OF NUCLEAR POWER PLANTS

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2017-01-01

    Full Text Available The reliability of the main circuit of electrical connections at a nuclear electric power plant that has two units with a capacity of 1,200 MW each has been determined. Reliability, economical, maneuverable properties of the atomic power plant under study are largely determined by its main circuit, so the choice of the circuit for the design and its status in the process of operation occur to be critical objectives. Main electrical connection circuits in nuclear electric power plants are selected on the basis of the schematic networks of the energy system and the land attached to the plant. The circuit of the connection of a nuclear power plant to the grid in the original normal operating modes at all stages of the construction of such a plant should provide the outcome of the full added capacity of a nuclear power plant and the preservation of its stability in the power system without the influence of the emergency system automatics when any outgoing transmission line is disabled. When selecting the main circuit the individual capacity of the installed units and their number are taken into account as well as the order of development of the plant and power supply system; the voltage on which the power of a plant is delivered; a shortcircuit current for switchgear high voltage and the need for their limitation by circuit means; the most power that can be lost when damage to any switch. A model of reliability of the main circuit of electrical connections is designed to detect all types of accidents that are possible at the coincidence of failures of elements with the repair and operational modes that differs in composition and damageability of the equipment, as well as under conditions of the development of accidents due to failure of operation of devices of relay protection and automation.

  5. Large screen mimic display design research for advanced main control room in nuclear power plant

    International Nuclear Information System (INIS)

    Zheng Mingguang; Yang Yanhua; Xu Jijun; Zhang Qinshun; Ning Zhonghe

    2002-01-01

    Firstly the evolution of mimic diagrams or displays used in the main control room of nuclear power plant was introduced. The active functions of mimic diagrams were analyzed on the release of operator psychological burden and pressure, the assistance of operator for the information searching, status understanding, manual actuation, correct decision making as well as the safe and reliable operation of the nuclear power plant. The importance and necessity to use the (large screen) mimic diagrams in advanced main control room of nuclear power plant, the design principle, design details and verification measures of large screen mimic display are also described

  6. The main pump motor remote visual check in the application of the domestic nuclear power plants

    International Nuclear Information System (INIS)

    Ge Lianwei; Yu Tao; Fang Jiang; Zhang Ting; Zhang Xingtian; Ding Youyuan

    2014-01-01

    In this paper, the Qinshan nuclear power station the first main pump motor to the successful implementation of remote visual inspection the main pump motor remote visual inspection applications. Qinshan Nuclear Power Plant Units 1 and 2 of the main pump motor inspection results show that the key components of the Qinshan Nuclear Power Plant Units 1 and 2 of the main pump rotor, stator end coils good condition, its problems for 10 years in the motor does not affect the normal use of the motor state disintegration overhaul problems tracking disintegration overhaul in 10 years. (authors)

  7. High-inertia hermetically sealed main coolant pump for next generation passive nuclear power plants

    International Nuclear Information System (INIS)

    Kujawski, Joseph M.; Nair, Bala R.; Vijuk, Ronald P.

    2003-01-01

    The main coolant pump for the Westinghouse AP1000 advanced passive nuclear power plant represents a significant scale-up in power, flow capacity, and physical size from its predecessor designed for the smaller AP600 power plant. More importantly, the AP1000 pump incorporates several innovative features that contribute to improved efficiency, operational reliability, and plant safety. The features include an internals design which provides the highest hydraulic efficiency achieved in commercial nuclear power plant applications. Another feature is the use of a distributed inertial mass system in the rotating assembly to develop the high rotational inertia to meet the extended system flow coastdown requirement for core heat removal in the event of loss of power to the pumps. This advanced canned motor pump also incorporates the latest development in higher operating voltage, providing plant designers with the ability to eliminate plant transformers and operate directly on the site electrical bus in many cases. The salient features of the pump design and performance data are presented in this paper. (author)

  8. Optimization of the main control room habitability system in nuclear power plant

    International Nuclear Information System (INIS)

    Zheng Guanghui; Zhao Xinyan

    2013-01-01

    This article describes the optimization of main control room habitability system in nuclear power plant. It also describes the design shortage in terms of habitability in the main control room. Through modification and optimization, habitable conditions are met for personnel staying in the emergency area of the main control room for a period of time, with an aim to take accident intervention measures smoothly and reduce the accident loss and radioactive contamination as low as possible. (authors)

  9. Main Characteristics of Nuclear Power Plants in the European Union and Candidate Countries

    International Nuclear Information System (INIS)

    Lillington, J.N.; Turland, B.D.; Haste, T.J.; Seiler, J.M.; Tapia, J.; Carretero, A.; Perez, T.; Geutges, A.; Sehgal, B.R.; Mattila, L.; Holmstrom, H.; Karwat, H.; Maroti, L.; Husarcek, J.

    2001-10-01

    The main objective was to advise the EC on future challenges and opportunities in terms of enhanced co-operation in the area of nuclear safety and harmonization of safety requirements and practices in an enlarged European Union Part of this activity was to provide a summary of the plant characteristics of the operating civil nuclear power plants in the EU Member and Candidate Countries. The present report provides these data in three formats: A reference table which lists the main characteristics of nuclear power-producing reactors operating in the European Union (EU) and Candidate Countries, as at 31 December 1999. Also included, for the sake of completeness, are data for reactors in the former Soviet Union, such as Russia and the Ukraine. The format adopted follows that in the annual International Atomic Energy Agency (IAEA) reference data report ''Nuclear Power Reactors of the World'', from which much of the information was taken; A summary table indicating totals by reactor type covering Western and Eastern Europe separately, again from IAEA sources, giving number of plant, total generating capacity and total years in operation. A list of the abbreviations for different reactor types is also provided; A set of detailed data sheets giving main plant characteristics for different reactor types ordered by country. These data sheets cover reactors in EU Member and Candidate Countries only. Details are provided on the origin of the data where these are available, so that further information may be obtained if desired and where permitted by commercial and/or proprietary considerations. (author)

  10. Digitized operator evaluation system for main control room of nuclear power plant

    International Nuclear Information System (INIS)

    Chen Yu; Yan Shengyuan; Chen Wenlong

    2014-01-01

    In order to evaluate the human-machine system matching relation of main control room in nuclear power plant accurately and efficiently, the expression and parameters of operator human body model were analyzed, and the evaluation required function of digital operator was determined. Based on the secondary development technology, the digital operator evaluation body model was developed. It could choose generation, gender, operation posture, single/eyes horizon, and left/right hand up to the domain according to the needs of specific evaluation, it was used to evaluate whether display information can be visible and equipment can be touch, and it also has key evaluation functions such as workspace and character visibility at the same time. The examples show that this method can complete the evaluation work of human-machine matching relation for main control room of nuclear power plant accurately, efficiently and quickly, and achieve the most optimal human-machine coordination relationship. (authors)

  11. OVERVIEW OF A RECONFIGURABLE SIMULATOR FOR MAIN CONTROL ROOM UPGRADES IN NUCLEAR POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring

    2012-10-01

    This paper provides background on a reconfigurable control room simulator for nuclear power plants. The main control rooms in current nuclear power plants feature analog technology that is growing obsolete. The need to upgrade control rooms serves the practical need of maintainability as well as the opportunity to implement newer digital technologies with added functionality. There currently exists no dedicated research simulator for use in human factors design and evaluation activities for nuclear power plant modernization in the U.S. The new research simulator discussed in this paper provides a test bed in which operator performance on new control room concepts can be benchmarked against existing control rooms and in which new technologies can be validated for safety and usability prior to deployment.

  12. Research on characteristics of communication content of operation crew in digital main control room of nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Ye Haifeng; Qing Tao; Li Pengcheng

    2015-01-01

    Communication content, communication mode and timeliness of communication are the main three factors that influence the effectiveness of the communication between team members. Based on the work domain analysis to execution of state-oriented procedures (SOP), the assumptions for operation crews' characteristics of the communication content in executing SOP were proposed, which supposed that the power plant status and parameters, power plant system functions and equipment, and SOP as well were the main communication contents. On a full-scope simulator of nuclear power plant, three operation crews performed experiments simulating accident scenarios. The results show that the assumptions of characteristics of the communication content are valid. (authors)

  13. The main features of control and operation of steam turbines at nuclear power plants

    International Nuclear Information System (INIS)

    Czinkoczky, B.

    1981-01-01

    The output and speed control of steam turbines at nuclear power plants as well as the combination of both controls are reviewed and evaluated. At the same time the tasks of unit control at nuclear power plants, the control of steady main steam pressure and medium pressure of primary circuit, further the connection of reactor and turbine controls and the self-controlling properties of pressurized water reactor are dealt with. Hydraulic and electro-hydraulic speed control, the connection of cach-up dampers and speed control and the application of electro-hydraulic signal converters are discussed. The accomplishment of protection is also described. (author)

  14. Comparative studies between nuclear power plants and hydroelectric power plants

    International Nuclear Information System (INIS)

    Menegassi, J.

    1984-01-01

    This paper shows the quantitative evolution of the power plants in the main countries of the world. The Brazilian situation is analysed, with emphasys in the technical and economical aspects related to power production by hidroelectric or nuclear power plants. The conclusion is that the electricity produced by hidro power plants becomes not economics when is intended to be produced at large distances from the demand centers. (Author) [pt

  15. Main lessons based on the Chernobyl nuclear power plant accident liquidation experience

    International Nuclear Information System (INIS)

    Vasil'chenko, V.N.; Nosovskij, A.V.

    2006-01-01

    The authors review the main lessons of the Chernobyl nuclear power plant accident and the liquidation of its consequences in the area of the nuclear reactors safety operation, any major accident management, liquidation accident consequences criteria, emergency procedures, preventative measures and treatment irradiated victims, the monitoring methods etc. The special emphasis is put on the questions of the emergency response and the antiaccidental measures planning in frame of international cooperation program

  16. Service life monitoring of the main components at the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Hahn, J.; Vincour, D.

    2007-01-01

    Knowledge and experience gained from the introduction and periodical implementation of life assessment of the major components of the Temelin nuclear power plant is summarized. The initial Soviet technical design of the plant did not incorporate lifetime monitoring and evaluation, therefore it was completed with demonstrative strength and lifetime calculations from Czech companies. Moreover, a Westinghouse primary circuit diagnosis and monitoring system, including the monitoring of temperature and pressure cycles for low-cycle fatigue evaluation, was installed at the plant. The DIALIFE code for the calculation of mainly the low-cycle fatigue of the key pressure components, was developed and installed subsequently as a superstructure to the monitoring system. (author)

  17. Research on cognitive reliability model for main control room considering human factors in nuclear power plants

    International Nuclear Information System (INIS)

    Jiang Jianjun; Zhang Li; Wang Yiqun; Zhang Kun; Peng Yuyuan; Zhou Cheng

    2012-01-01

    Facing the shortcomings of the traditional cognitive factors and cognitive model, this paper presents a Bayesian networks cognitive reliability model by taking the main control room as a reference background and human factors as the key points. The model mainly analyzes the cognitive reliability affected by the human factors, and for the cognitive node and influence factors corresponding to cognitive node, a series of methods and function formulas to compute the node cognitive reliability is proposed. The model and corresponding methods can be applied to the evaluation of cognitive process for the nuclear power plant operators and have a certain significance for the prevention of safety accidents in nuclear power plants. (authors)

  18. In-service diagnostics of main circulating circuit pipes of WWER nuclear power plants

    International Nuclear Information System (INIS)

    Svoboda, V.; Merta, J.; Merta, V.

    1982-01-01

    The application is discussed of the acoustic emission method for testing the integrity of the components of the main circulating circuit of the WWER 440 nuclear power plant. A description is given of the main circulating circuit and a stress analysis on the basis of strength computations considering operating modes is presented. An analysis is also presented of the possible damage of the pipe material as related to the application of the acoustic emission method for in-service inspection of the pipes. Certain practical problems of application are discussed. (author)

  19. Validation study on reliability analysis of main safety system in Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Nam Jin; Cho, Chang Keun; Kim, Yong Hui; Kim, Tae Hyeong; Hong, Seo Kee; Park, Keon Woo; Park, Chang Jea [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of); Cheong, Woo Sik [Institute for Advanced Engineering, Yongin (Korea, Republic of); Park, Moon Kyu [KEPRI, Taejon (Korea, Republic of)

    1993-12-15

    The scope and contents of this validation study are to review the design changes of the four main safety systems in Wolsong 2/3/4 Nuclear Power Plants, to review the consideration of the above design changes in the AECL reports, the structure of fault trees, and the data base used in the quantification of the fault trees, to quantify the unavailabilities of main safety systems and check them if they meet the requirements, and to recommend desirable design changes in the emergency core cooling system to reduce the unavailability.

  20. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    Majercak, V.; Srenkelova, Z.; Kristak, J.G.

    1997-01-01

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  1. The advanced main control console for next japanese PWR plants

    International Nuclear Information System (INIS)

    Tsuchiya, A.; Ito, K.; Yokoyama, M.

    2001-01-01

    The purpose of the improvement of main control room designing in a nuclear power plant is to reduce operators' workload and potential human errors by offering a better working environment where operators can maximize their abilities. In order to satisfy such requirements, the design of main control board applied to Japanese Pressurized Water Reactor (PWR) type nuclear power plant has been continuously modified and improved. the Japanese Pressurized Water Reactor (PWR) Utilities (Electric Power Companies) and Mitsubishi Group have developed an advanced main control board (console) reflecting on the study of human factors, as well as using a state of the art electronics technology. In this report, we would like to introduce the configuration and features of the Advanced Main Control Console for the practical application to the next generation PWR type nuclear power plants including TOMARI No.3 Unit of Hokkaido Electric Power Co., Inc. (author)

  2. Reliability analysis of operator's monitoring behavior in digital main control room of nuclear power plants and its application

    International Nuclear Information System (INIS)

    Zhang Li; Hu Hong; Li Pengcheng; Jiang Jianjun; Yi Cannan; Chen Qingqing

    2015-01-01

    In order to build a quantitative model to analyze operators' monitoring behavior reliability of digital main control room of nuclear power plants, based on the analysis of the design characteristics of digital main control room of a nuclear power plant and operator's monitoring behavior, and combining with operators' monitoring behavior process, monitoring behavior reliability was divided into three parts including information transfer reliability among screens, inside-screen information sampling reliability and information detection reliability. Quantitative calculation model of information transfer reliability among screens was established based on Senders's monitoring theory; the inside screen information sampling reliability model was established based on the allocation theory of attention resources; and considering the performance shaping factor causality, a fuzzy Bayesian method was presented to quantify information detection reliability and an example of application was given. The results show that the established model of monitoring behavior reliability gives an objective description for monitoring process, which can quantify the monitoring reliability and overcome the shortcomings of traditional methods. Therefore, it provides theoretical support for operator's monitoring behavior reliability analysis in digital main control room of nuclear power plants and improves the precision of human reliability analysis. (authors)

  3. IAEA activities and main achievements on human resource management and training of nuclear power plant personnel

    International Nuclear Information System (INIS)

    Kossilov, A.

    2002-01-01

    The Nuclear Power Engineering Section is responsible for implementation of the Agency's sub-programme on Engineering and Management Support for Competitive Nuclear Power. The objectives of the sub-programme is to increase Member State capabilities in utilizing the best engineering and management practices for improving NPP performance and competitiveness, optimizing plant service life and decommissioning and strengthening nuclear power infrastructure. NPES' main activities cover: Nuclear power infrastructure, Knowledge management, Personal training and qualification, Quality Management and QA, NPP life management including databases, Modern NPP control and instrumentation, and NPP performance management

  4. External main-induced events in relation to nuclear power plant siting

    International Nuclear Information System (INIS)

    1981-01-01

    This safety Guide recomments procedures and provides information for use in implementing that part of the code of safety in Nuclear Power Plant Siting (IAEA Safety Series No. 50-C-S) which concerns man-induced events external to the plant, up to the evaluation of corresponding design basis parameters. Like the code, the Guide forms part of the IAEA's programme, referred to as the NUSS programme, for establishing codes of practice and safety Guides relating to land-based stationary thermal neutron power plants

  5. Thermal expansion measurement of turbine and main steam piping by using strain gages in power plants

    International Nuclear Information System (INIS)

    Na, Sang Soo; Chung, Jae Won; Bong, Suk Kun; Jun, Dong Ki; Kim, Yun Suk

    2000-01-01

    One of the domestic co-generation plants have undergone excessive vibration problems of turbine attributed to external force for years. The root cause of turbine vibration may be shaft alignment problem which sometimes is changed by thermal expansion and external force, even if turbine technicians perfectly performed it. To evaluate the alignment condition from plant start-up to full load, a strain measurement of turbine and main steam piping subjected to thermal loading is monitored by using strain gages. The strain gages are bonded on both bearing housing adjusting bolts and pipe stoppers which installed in the x-direction of left-side main steam piping near the turbine inlet in order to monitor closely the effect of turbine under thermal deformation of turbine casing and main steam piping during plant full load. Also in situ load of constant support hangers in main steam piping system is measured by strain gages and its results are used to rebalance the hanger rod load. Consequently, the experimental stress analysis by using strain gages turns out to be very useful tool to diagnose the trouble and failures of not only to stationary components but to rotating machinery in power plants

  6. Feasibility study for biomass power plants in Thailand. Volume 1. Main report. Export trade information

    International Nuclear Information System (INIS)

    1997-01-01

    This study, conducted by Black and Veatch, was funded by the U.S. Trade and Development Agency. The report presents a technical and commercial analysis for the development of three nearly identical electricity generating facilities (biomass steam power plants) in the towns of Chachoengsao, Suphan Buri, and Pichit in Thailand. The Main Report is divided into the following sections: (1.0) Executive Study; (2.0) Project Objectives; (3.0) Review of Combustion Technology for Biomass Fueled Steam Generator Units; (4.0) Conceptual Design; (5.0) Plant Descriptions; (6.0) Plant Operations Staffing; (7.0) Project Schedule; (8.0) Project Cost Estimate; (9.0) Financial Analysis; Appendix - Financial Analysis

  7. Study on quality control measures of static casting main pipe in PWR nuclear power plant

    International Nuclear Information System (INIS)

    Jiang Zhenbiao; Li Guanying; Liu Zhicheng

    2013-01-01

    This study analyzes the main reasons which impact the quality of primary pipe static casting elbows in PWR-M310 nuclear power plant. The quality control measures are developed from the election and inspection of material, improving sand production and casting process, improving lean management of personnel. The static casting defects of primary pipe elbows for Fuqing Unit 1 and 2 were down to less than 50% of the former project. The quality of static casting for the primary pipe elbows was significantly improved. Moreover, the implementation saves human resources and financing to repair casting defects, and also helps to win the delivery schedule. The quality control measures are good reference for improving primary pipe casting process. This study provides valuable experience for further study of improving the quality of static casting for the primary pipe of PWR nuclear power plant. (authors)

  8. Nuclear power. Volume 1. Nuclear power plant design

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 1 contains the following chapters; (1) nuclear reactor theory; (2) nuclear reactor design; (3) types of nuclear power plants; (4) licensing requirements; (5) shielding and personnel exposure; (6) containment and structural design; (7) main steam and turbine cycles; (8) plant electrical system; (9) plant instrumentation and control systems; (10) radioactive waste disposal (waste management) and (11) conclusion

  9. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  10. Plug the socket of the main closing valve in a nuclear power plant

    International Nuclear Information System (INIS)

    Neupauer, J.; Bednar, B.

    1988-01-01

    The plug is designed for closing the main closing valve socket during a refuelling shutdown of a nuclear power plant. The plug is fixed in the using jaws forced against the socket ring part. The socket is sealed by expanding a ring between two cone trays. A valve provided in the plug allows draining the pipe. The plug is inserted in the socket using a jib suspended on a rail. Following sealing both sockets the inner surfaces of the closing valve can be decontaminated. Following decontamination, a water-proof cover is slid over the plug protecting the plug moving mechanism from damage. (J.B.). 1 fig

  11. Cooling towers of nuclear power plants

    International Nuclear Information System (INIS)

    Mikyska, L.

    1986-01-01

    The specifications are given of cooling towers of foreign nuclear power plants and a comparison is made with specifications of cooling towers with natural draught in Czechoslovak nuclear power plants. Shortcomings are pointed out in the design of cooling towers of Czechoslovak nuclear power plants which have been derived from conventional power plant design. The main differences are in the adjustment of the towers for winter operation and in the designed spray intensity. The comparison of selected parameters is expressed graphically. (J.B.)

  12. Power grid, mains filtering and power line communications ... a root cause for incompatibilities

    NARCIS (Netherlands)

    Coenen, Mart

    2013-01-01

    The power grid is intentionally meant to distribute electrical energy at the mains frequency, as produced by the electricity generating plants, towards the end-users. The three-phase low-voltage distribution network can be utilized more efficiently when a power factor of 1 is achieved and no

  13. The main methods of solving the problem of radioactive waste management from nuclear power stations and spent fuel reprocessing plants in the USSR

    International Nuclear Information System (INIS)

    1978-09-01

    The main directions of solving the problem of radioactive waste management from nuclear power stations and radiochemical plants, the aspects of gaseous waste management, liquid HLW storage in vessels and the problems of heat removal during storage of vitrified HLW in surface storages are considered. The main problems arising during fine decontamination of gaseous discharges from nuclear power stations and reprocessing plants are discussed. The migration of fission products in the environment and technical aspects of their capture from gaseous discharges are also considered

  14. Decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Vollradt, J.

    1977-01-01

    A survey of the main questions of decommissioning of nuclear power plants will be given in the sight of German utilities (VDEW-Working group 'Stillegung'). The main topics are: 1) Definitions of decommissioning, entombment, removal and combinations of such alternatives; 2) Radioactive inventory (build up and decay); 3) Experience up to now; 4) Possibilities to dismantle are given by possibility to repair nuclear power plants; 5) Estimated costs, waste, occupational radiation dose; 6) German concept of decommissioning. (orig./HK) [de

  15. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Lashgari, Farbod.

    1995-01-01

    This paper is about maintenance of nuclear power plants. In part one, the outage management of nuclear power plants has described. Meaning of the outage and objectives of outage management is given in introduction. The necessity of a long-term outage strategy is shown in chapter one. The main parts of an outage are as follows: Planning; Preparation; Execution, Each of them and also post-outage review have been explained in the followed chapters. Part two deals with technical details of main primary components of nuclear power plant type WWER. After an introduction about WWER reactors, in each chapter first the general and detailed description of main primary components has given and then their maintenance schedules and procedures. Chapter about reactor and steam generator is related to both types of WWER-440 and WWER-1000, but chapter about reactor coolant pump has specified to WWER-1000 to be more in details.(author)

  16. Benchmarking Nuclear Power Plants

    International Nuclear Information System (INIS)

    Jakic, I.

    2016-01-01

    One of the main tasks an owner have is to keep its business competitive on the market while delivering its product. Being owner of nuclear power plant bear the same (or even more complex and stern) responsibility due to safety risks and costs. In the past, nuclear power plant managements could (partly) ignore profit or it was simply expected and to some degree assured through the various regulatory processes governing electricity rate design. It is obvious now that, with the deregulation, utility privatization and competitive electricity market, key measure of success used at nuclear power plants must include traditional metrics of successful business (return on investment, earnings and revenue generation) as well as those of plant performance, safety and reliability. In order to analyze business performance of (specific) nuclear power plant, benchmarking, as one of the well-established concept and usual method was used. Domain was conservatively designed, with well-adjusted framework, but results have still limited application due to many differences, gaps and uncertainties. (author).

  17. Nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Nuclear power plants maintenance now appears as an important factor contributing to the competitivity of nuclea energy. The articles published in this issue describe the way maintenance has been organized in France and how it led to an actual industrial activity developing and providing products and services. An information note about Georges Besse uranium enrichment plant (Eurodif) recalls that maintenance has become a main data not only for power plants but for all nuclear industry installations. (The second part of this dossier will be published in the next issue: vol. 1 January-February 1989) [fr

  18. Recent Operating Experience involving Power Electronics Failure in Korea Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Jaedo

    2015-01-01

    Recently, modern power electronics devices for electrical component were steadily increased in electrical systems which used for main power control and protection. To upgrade the system reliability we recommended the redundancy for electrical equipment trip system. The past several years, Korean Nuclear power plants have changed the electrical control and protection systems (Auto Voltage Regulator, Power Protection Relay) for main generator and main power protection relay systems. In this paper we deal with operating experience involving modern solid state power electronics failure in Korean nuclear power plants. One of the failures we will discuss the degraded phenomenon of power electronics device for CEDMCS(Control Element Drive Mechanism Control System). As the result of the failure we concerned about the modification for trip source of main generator excitation systems and others. We present an interesting issue for modern solid state devices (IGBT, Thyristors). (authors)

  19. Power generation by nuclear power plants

    International Nuclear Information System (INIS)

    Bacher, P.

    2004-01-01

    Nuclear power plays an important role in the world, European (33%) and French (75%) power generation. This article aims at presenting in a synthetic way the main reactor types with their respective advantages with respect to the objectives foreseen (power generation, resources valorization, waste management). It makes a fast review of 50 years of nuclear development, thanks to which the nuclear industry has become one of the safest and less environmentally harmful industry which allows to produce low cost electricity: 1 - simplified description of a nuclear power generation plant: nuclear reactor, heat transfer system, power generation system, interface with the power distribution grid; 2 - first historical developments of nuclear power; 3 - industrial development and experience feedback (1965-1995): water reactors (PWR, BWR, Candu), RBMK, fast neutron reactors, high temperature demonstration reactors, costs of industrial reactors; 4 - service life of nuclear power plants and replacement: technical, regulatory and economical lifetime, problems linked with the replacement; 5 - conclusion. (J.S.)

  20. Nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Yaziz Yunus

    1986-01-01

    A number of issues have to be taken into account before the introduction of any nuclear power plant in any country. These issues include reactor safety (site and operational), waste disposal and, lastly, the decommissioning of the reactor inself. Because of the radioactive nature of the components, nuclear power plants require a different approach to decommission compared to other plants. Until recently, issues on reactor safety and waste disposal were the main topics discussed. As for reactor decommissioning, the debates have been academic until now. Although reactors have operated for 25 years, decommissioning of retired reactors has simply not been fully planned. But the Shippingport Atomic Power Plant in Pennysylvania, the first large scale power reactor to be retired, is now being decommissioned. The work has rekindled the debate in the light of reality. Outside the United States, decommissioning is also being confronted on a new plane. (author)

  1. Nuclear power plant

    International Nuclear Information System (INIS)

    Schabert, H.P.; Laurer, E.

    1976-01-01

    The invention concerns a quick-acting valve on the main-steam pipe of a nuclear power plant. The engineering design of the valve is to be improved. To the main valve disc, a piston-operated auxiliary valve disc is to be assigned closing a section of the area of the main valve disc. This way it is avoided that the drive of the main valve disc has to carry out different movements. 15 sub-claims. (UWI) [de

  2. Main pumps lost incident in the nuclear power plant Atucha I. Modelling with RELAP5/MOD3.2

    International Nuclear Information System (INIS)

    Ventura, M.A.; Rosso, R.D.

    1998-01-01

    Time evolution of natural circulation in the nuclear power plant Atucha I (CNA-I), in a main pumps lost incident because of the lost of external power feed, is analyzed. It leads to a strong stop transient, without an important blow down, from a forced nominal flow to a natural circulation one. The results are obtained from RELAP5/MOD3.2 code's modeling. The study is based on the refrigeration conditions analysis, during the first minutes of the reactor out of service. Previously to the transient, work had been done to obtain the plant steady state, with design parameters in operation conditions at 100 % of power. The object is that the actual plant state would be represented. In this way, each plant part (steam generators, reactor, pressurizer, pumps) had been modeled in separated form with the appropriate boundary conditions, to be used in the whole circuit simulation. The developed model, had been validated making use of the comparison between the values obtained to the principal thermodynamic parameters with the plant recorded values, in the same incident. The results are satisfactory in a way. On the other hand, it has suggested some modeling changes. The RELAP5/MOD3.2 capability to model the thermodynamic phenomena in a PHWR plant has been verified when, according to the mentioned incident, the flow pass from a nominal forced flow, to one which is governed by natural circulation, still with the CNA-I untypical design conditions. (author) [es

  3. Nuclear power plant V-1

    International Nuclear Information System (INIS)

    1998-01-01

    The nuclear power plant Bohunice V -1 is briefly described. This NPP consists from two reactor units. Their main time characteristics are (Reactor Unit 1, Reactor Unit 2): beginning of construction - 24 April 1972; first controlled reactor power - 27 November 1978, 15 March 1980; connection to the grid - 17 December 1978, 26 March 1980; commercial operation - 1 April 1980, 7 January 1981. This leaflet contains: NPP V-1 construction; Major technological equipment (Primary circuit: Nuclear reactor [WWER 440 V230 type reactor];Steam generator; Reactor Coolant Pumps; Primary Circuit Auxiliary Systems. Secondary circuit: Turbine generators, Nuclear power plant electrical equipment; power plant control) and technical data

  4. Latina nuclear power plant

    International Nuclear Information System (INIS)

    1976-03-01

    In the period under review, the Latina power plant produced 1009,07 million kWh with a utilization factor of 72% and an availability factor of 80,51%. The disparity between the utilization and availability factors was mainly due to the shutdown of the plant owing to trade union strife. The reasons for non-availability (19,49%) were almost all related to the functioning of the conventional part and the general servicing of the plant (18 September-28 October). During the shutdown for maintenance, an inspection of the steel members and parts of the core stabilizing structure was made in order to check for the familiar oxidation phenomena caused by CO 2 ; the results of the inspection were all satisfactory. Operation of the plant during 1974 was marked by numerous power cutbacks as a result of outages of the steam-raising units (leaks from the manifolds) and main turbines (inspection and repairs to the LP rotors). Since it was first brought into commercial operation, the plant has produced 13,4 thousand million kWh

  5. Improvement on main control room for Japanese PWR plants

    International Nuclear Information System (INIS)

    Matsumiya, Masayuki

    1996-01-01

    The main control room which is the information center of nuclear power plant has been continuously improved utilizing the state of the art ergonomics, a high performance computer, computer graphic technologies, etc. For the latest Japanese Pressurized Water Reactor (PWR) plant, the CRT monitoring system is applied as the major information source for facilitating operators' plant monitoring tasks. For an operating plant, enhancement of monitoring and logging functions has been made adopting a high performance computer

  6. Water hammer calculation and analysis in main feedwater system of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Wang Xin; Han Weishi

    2010-01-01

    The main feedwater system of a nuclear power plant is an important part in ensuring the cooling of the steam generator. Moreover, it is the main pipe section where water hammers frequently occur. Studying the regular patterns of water hammers to the main feedwater system is significant to the stable operation of the system. The paper focuses on the study of water hammers through Flowmaster's transient calculating function to establish a mathematical model with boundary conditions such as a feedwater pump, control valves, etc.; calculation of the water hammers pressure when feedwater pumps and control valves shut down; exporting the instantaneous change in solution of pressure. Combined with engineering practical examples, the conclusions verify the viability of calculating the water hammers pressure through Flowmaster's transient function, increasing the periods of closure of control valves and feedwater pumps control water hammers effectively, changing the intervals of closing signals to feedwater pumps and control valves to relieve hydraulic impact. This could be a guideline for practical engineering design and system optimization. (authors)

  7. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    1998-01-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1997 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1997; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; forecasts; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  8. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2003-01-01

    This 2003 version of Elecnuc contents information, data and charts on the nuclear power plants in the world and general information on the national perspectives concerning the electric power industry. The following topics are presented: 2002 highlights; characteristics of main reactor types and on order; map of the French nuclear power plants; the worldwide status of nuclear power plants on 2002/12/3; units distributed by countries; nuclear power plants connected to the Grid by reactor type groups; nuclear power plants under construction; capacity of the nuclear power plants on the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear plants by country at the end 2002; performance indicator of french PWR units; trends of the generation indicator worldwide from 1960 to 2002; 2002 cumulative Load Factor by owners; nuclear power plants connected to the grid by countries; status of license renewal applications in Usa; nuclear power plants under construction; Shutdown nuclear power plants; exported nuclear power plants by type; exported nuclear power plants by countries; nuclear power plants under construction or order; steam generator replacements; recycling of Plutonium in LWR; projects of MOX fuel use in reactors; electricity needs of Germany, Belgium, Spain, Finland, United Kingdom; electricity indicators of the five countries. (A.L.B.)

  9. Considerations for surviving the loss of a main feedwater pump at full power

    International Nuclear Information System (INIS)

    Gaydos, K.A.; Calvo, R.; Conroy, P.W.; Klein, C.M.; Mellers, J.E.

    1990-01-01

    Today's economics dictate that nuclear power operational costs be contained by addressing frequently-occurring trips that might be minimized or avoided via specific upgrades. Much recent attention has focused on the significant percentage of plant trips related to feedwater flow regulation; however, another frequent feedwater-related trip stems from the loss of a single main feedwater pump while operating at high power levels, causing a plant trip on low steam generator water-level. This paper summarizes the results of several plant-specific studies that evaluate a unit's capabilities to consistently survive the loss of a main feedwater pump from full power, and outlines a methodology for analyzing this capability

  10. Control of renewable distributed power plants

    OpenAIRE

    Bullich Massagué, Eduard

    2015-01-01

    The main objective of this master thesis is to design a power plant controller for a photo- voltaic (PV) power plant. In a first stage, the current situation of the status of the electrical grid is analysed. The electrical network structure is moving from a conventional system (with centralized power generation, unidirectional power ows, easy control) to a smart grid system consisting on distributed generation, renewable energies, smart and complex control architecture and ...

  11. Psychological factors of professional success of nuclear power plant main control room operators

    Directory of Open Access Journals (Sweden)

    Kosenkov A.A.

    2014-12-01

    Full Text Available Aim: to conduct a comparative analysis of the psychological characteristics of the most and least successful main control room operators. Material and Methods. Two NPP staff groups: the most and least successful main control room operators, who worked in routine operating conditions, were surveyed. Expert evaluation method has been applied to identify the groups. The subjects were administered the Minnesota Multiphasic Personality Inventory (MMPI, Cattell's Sixteen Personality Factor Questionnaire (16PF form A and Raven's Progressive Matrices test. Results. Numerous significant psychological differences between the groups of most and least successful control room operators were obtained: the best operators were significantly more introverted and correctly solved more logical tasks with smaller percentage of mistakes under time pressure than worst ones. Conclusions: 1. The psychodiagnostic methods used in the study were adequate to meet research objective 2. Tendency to introversion, as well as developed the ability to solve logic problems undertime pressure, apparently, are important professional qualities for control room operators. These indicators should be considered in the process of psychological selection and professional guidance of nuclear power plant operators.

  12. Main phases of siting for nuclear power plants with review of required investigations

    International Nuclear Information System (INIS)

    Malbasa, N.

    1984-01-01

    The purpose of the article is a short description of the main phases in the process of siting for nuclear power plants as interpreted and applied by the Institut za elektroprivredu, Zagreb in the screening, comparison and evaluation of the sites for NPPs in the SR of Croatia. The scope and purpose, as well as review of required data and investigations for each particular phase are given. Common used methods for the comparison of sites are described and example of rejection criteria applicable for early phases of the siting is proposed. It is given a list of the most important activities which detailed analysis id indispensable for ending of the evaluation and getting a site permit from the regulatory body. A legal and regulatory basis for carrying out the siting process is also described. (author)

  13. Elecnuc. Nuclear power plants worldwide

    International Nuclear Information System (INIS)

    1998-01-01

    This small folder presents a digest of some useful information concerning the nuclear power plants worldwide and the situation of nuclear industry at the end of 1997: power production of nuclear origin, distribution of reactor types, number of installed units, evolution and prediction of reactor orders, connections to the grid and decommissioning, worldwide development of nuclear power, evolution of power production of nuclear origin, the installed power per reactor type, market shares and exports of the main nuclear engineering companies, power plants constructions and orders situation, evolution of reactors performances during the last 10 years, know-how and development of nuclear safety, the remarkable facts of 1997, the future of nuclear power and the energy policy trends. (J.S.)

  14. Nuclear power plant status diagnostics using artificial neural networks

    International Nuclear Information System (INIS)

    Bartlett, E.B.; Uhrig, R.E.

    1991-01-01

    In this work, the nuclear power plant operating status recognition issue is investigated using artificial neural networks (ANNs). The objective is to train an ANN to classify nuclear power plant accident conditions and to assess the potential of future work in the area of plant diagnostics with ANNS. To this end, an ANN was trained to recognize normal operating conditions as well as potentially unsafe conditions based on nuclear power plant training simulator generated accident scenarios. These scenarios include; hot and cold leg loss of coolant, control rod ejection, loss of offsite power, main steam line break, main feedwater line break and steam generator tube leak accidents. Findings show that ANNs can be used to diagnose and classify nuclear power plant conditions with good results

  15. Economics of hybrid photovoltaic power plants

    Energy Technology Data Exchange (ETDEWEB)

    Breyer, Christian

    2012-08-16

    The global power supply stability is faced to several severe and fundamental threats, in particular steadily increasing power demand, diminishing and degrading fossil and nuclear energy resources, very harmful greenhouse gas emissions, significant energy injustice and a structurally misbalanced ecological footprint. Photovoltaic (PV) power systems are analysed in various aspects focusing on economic and technical considerations of supplemental and substitutional power supply to the constraint conventional power system. To infer the most relevant system approach for PV power plants several solar resources available for PV systems are compared. By combining the different solar resources and respective economics, two major PV systems are identified to be very competitive in almost all regions in the world. The experience curve concept is used as a key technique for the development of scenario assumptions on economic projections for the decade of the 2010s. Main drivers for cost reductions in PV systems are learning and production growth rate, thus several relevant aspects are discussed such as research and development investments, technical PV market potential, different PV technologies and the energetic sustainability of PV. Three major market segments for PV systems are identified: off-grid PV solutions, decentralised small scale on-grid PV systems (several kWp) and large scale PV power plants (tens of MWp). Mainly by application of 'grid-parity' and 'fuel-parity' concepts per country, local market and conventional power plant basis, the global economic market potential for all major PV system segments is derived. PV power plant hybridization potential of all relevant power technologies and the global power plant structure are analyzed regarding technical, economical and geographical feasibility. Key success criteria for hybrid PV power plants are discussed and comprehensively analysed for all adequate power plant technologies, i.e. oil, gas and coal fired power

  16. Economics of hybrid photovoltaic power plants

    Energy Technology Data Exchange (ETDEWEB)

    Breyer, Christian

    2012-08-16

    The global power supply stability is faced to several severe and fundamental threats, in particular steadily increasing power demand, diminishing and degrading fossil and nuclear energy resources, very harmful greenhouse gas emissions, significant energy injustice and a structurally misbalanced ecological footprint. Photovoltaic (PV) power systems are analysed in various aspects focusing on economic and technical considerations of supplemental and substitutional power supply to the constraint conventional power system. To infer the most relevant system approach for PV power plants several solar resources available for PV systems are compared. By combining the different solar resources and respective economics, two major PV systems are identified to be very competitive in almost all regions in the world. The experience curve concept is used as a key technique for the development of scenario assumptions on economic projections for the decade of the 2010s. Main drivers for cost reductions in PV systems are learning and production growth rate, thus several relevant aspects are discussed such as research and development investments, technical PV market potential, different PV technologies and the energetic sustainability of PV. Three major market segments for PV systems are identified: off-grid PV solutions, decentralised small scale on-grid PV systems (several kWp) and large scale PV power plants (tens of MWp). Mainly by application of 'grid-parity' and 'fuel-parity' concepts per country, local market and conventional power plant basis, the global economic market potential for all major PV system segments is derived. PV power plant hybridization potential of all relevant power technologies and the global power plant structure are analyzed regarding technical, economical and geographical feasibility. Key success criteria for hybrid PV power plants are discussed and comprehensively analysed for all adequate power plant technologies, i.e. oil, gas and

  17. Main influence factors on the final energy generation cost of a nuclear power plant in comparison with other energy sources

    International Nuclear Information System (INIS)

    Souza, J.A.M. de; Glardon, C.; Schmidt, R.M.

    1981-01-01

    The main factors in the construction and in the operation of nuclear power plants that affect the final energy generation cost are presented. The structure of the energy generation cost, of the nuclear fuel cost and the total investment are studied. (E.G.) [pt

  18. Investigation of the impact of main control room digitalization on operators cognitive reliability in nuclear power plants.

    Science.gov (United States)

    Zhou, Yong; Mu, Haiying; Jiang, Jianjun; Zhang, Li

    2012-01-01

    Currently, there is a trend in nuclear power plants (NPPs) toward introducing digital and computer technologies into main control rooms (MCRs). Safe generation of electric power in NPPs requires reliable performance of cognitive tasks such as fault detection, diagnosis, and response planning. The digitalization of MCRs has dramatically changed the whole operating environment, and the ways operators interact with the plant systems. If the design and implementation of the digital technology is incompatible with operators' cognitive characteristics, it may have negative effects on operators' cognitive reliability. Firstly, on the basis of three essential prerequisites for successful cognitive tasks, a causal model is constructed to reveal the typical human performance issues arising from digitalization. The cognitive mechanisms which they impact cognitive reliability are analyzed in detail. Then, Bayesian inference is used to quantify and prioritize the influences of these factors. It suggests that interface management and unbalanced workload distribution have more significant impacts on operators' cognitive reliability.

  19. Management of main generator condition during long term plant shut down at Higashidori Nuclear Power Station Unit 1

    International Nuclear Information System (INIS)

    Kato, Seiji

    2014-01-01

    Higashidori Nuclear Power Station Unit 1 shut down on February 6, 2011 to start 4th refuel outage. On March 11, 2011, we keep going refuel outage on this moment a large earthquake occurred and tsunami was generated following it which called 'Great East Japan Earthquake'. Refuel outage takes 3 ∼ 5 months normally but Higashidori NPS still keeping shut down over 3 years due to some issues. In this paper, we introduce about management of Main generator condition during long term plant shut down situation in addition to normal plant shut down situation to keep well. (author)

  20. VGB-requirements regarding technical data for power plants

    International Nuclear Information System (INIS)

    Richnow, Joerg

    2009-01-01

    Much of the technical plant data resulting from the planning, construction and start-up of power plants is needed for subsequent management and maintenance. Because of this, VGB has taken the initiative and has defined standard minimum requirements from power plant operators for technical plant data. They relate to the details and structure of this data, the definition of material classes and characteristics for the main power plant components and IT implementation for delivery of the technical plant data. (orig.)

  1. HVDC transmission from isorated nuclear power plant

    International Nuclear Information System (INIS)

    Takenaka, Kiyoshi; Takasaki, Masahiro; Ichikawa, Tatemi; Hayashi, Toshiyuki

    1985-01-01

    HVDC transmission directly from nuclear power plant is considered as one of the patterns of long distance and large capacity transmission system. This reports considers two route HVDC transmission from PWR type nuclear power plant, and analyzes dynamic response characteristics due to bus fault, main protection failure and etc. using the AC-DC Power System Simulator. (author)

  2. Plant nominal power uprating offers attractive possibilities

    International Nuclear Information System (INIS)

    Bruyere, Michel

    2004-01-01

    Increasing the rated thermal power of an existing plant represents a particularly profitable way for a plant operator to increase electricity production. For PWR plants, a 5% increase in power can, in fact, generally be achieved without significantly modifying systems and equipments based upon the margin in the original design. Larger power increases can be achieved in the case of S.G. replacement. Based on recent analysis of a 3 loop PWR, 900 MWe, up to 12% power uprating is feasible with an appropriate replacement S.G. The general rule is to perform power uprating without significant increase of average primary temperature. This is mainly a result of consideration of S.G. tube corrosion, of fuel clad corrosion and of core safety margins (DNBR margins in particular). This paper will present a general overview of the analyses for large power uprating: program of work, main conclusions on the following items: 1. Safety demonstration (accident analysis, safeguard systems capacity verification, required protection setpoints modifications...) 2. Normal operation review (possible consequences of power uprating on the plant maneuverability and on the fuel management performances) 3. Systems and components mechanical integrity review and potential effect on the plant lifetime of the new operating conditions

  3. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2000-01-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1999 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1999; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; grid connection forecasts; world electric power market; electronuclear owners and share holders in EU, capacity and load factor; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; 1999 gross load factor by operator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  4. Loviisa nuclear power plant analyzer

    International Nuclear Information System (INIS)

    Porkholm, K.; Nurmilaukas, P.; Tiihonen, O.; Haenninen, M.; Puska, E.

    1992-12-01

    The APROS Simulation Environment has been developed since 1986 by Imatran Voima Oy (IVO) and the Technical Research Centre of Finland (VTT). It provides tools, solution algorithms and process components for use in different simulation systems for design, analysis and training purposes. One of its main nuclear applications is the Loviisa Nuclear Power Plant Analyzer (LPA). The Loviisa Plant Analyzer includes all the important plant components both in the primary and in the secondary circuits. In addition, all the main control systems, the protection system and the high voltage electrical systems are included. (orig.)

  5. Modernization and power increase nuclear power plant Laguna Verde (Mexico)

    International Nuclear Information System (INIS)

    Garcia-Serrano, J. L.; Merino, A.; Ruiz Gutierrez, L.

    2011-01-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Uprate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4 years (82007-2010), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. (Author)

  6. Effect of special features of nuclear power plants

    International Nuclear Information System (INIS)

    Scharf, H.

    1986-01-01

    Special features of nuclear power plants are reported with the Muelheim-Kaerlich pressurized water reactor as the reference plant. This nuclear reactor uses 'Once Through Steam Generators (OTSG)' with 'Integrated Economizer' to provide the turbine with superheated steam. The implementation of OTSG allows to operate the plant with constant steam pressure over the entire power range, and with constant main coolant temperature over a power range from 15% power to 100% power. Control of the plant during power operation is provided by the 'Integrated Control System', which simultaneously sends signals to the plant's subsystems reactor, OTSG, and turbine to get optimum response of the plant during power transients. The characteristics of this 'Integrated Control System' and its different modes of operation are presented. (orig./GL)

  7. Economical aspects of a nuclear power plant project

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Santos, E.M. dos

    1992-01-01

    This work describes different aspects and parameters that should be regarded as guidelines for economic evaluation of small and medium power plant projects. The main objective of an economic evaluation is to establish the plant's unitary cost and its economic figure of merit. To achieve that, a number of studies must be undertaken to compare the global competitiveness of a nuclear power plant with other energetic alternatives. These studies involve macro economy, energy generation, electricity transmission and global feasibility of the enterprise. It is concluded that the economic evaluation of a nuclear power plant should be considered as the culmination of a long process of planning at a national level. The main reasons are the investments involved, the technological developments required and political implications of the utilization of nuclear power energy. (author)

  8. Damping of Low Frequency Power System Oscillations with Wind Power Plants

    DEFF Research Database (Denmark)

    Adamczyk, Andrzej Grzegorz

    of wind power plants on power system low frequency oscillations and identify methods and limitations for potential contribution to the damping of such oscillations. Consequently, the first part of the studies focuses on how the increased penetration of wind power into power systems affects their natural...... oscillatory performance. To do so, at first a generic test grid displaying a complex inter-area oscillation pattern is introduced. After the evaluation of the test grid oscillatory profile for various wind power penetration scenarios, it is concluded that full-converter based wind power plant dynamics do......-synchronous power source. The main body of the work is devoted to the damping control design for wind power plants with focus on the impact of such control on the plant operation. It can be expected that the referred impact is directly proportional to the control effort, which for power processing devices should...

  9. Environmental survey around EDF nuclear power plants

    International Nuclear Information System (INIS)

    Foulquier, L.

    1992-01-01

    Description of various types of environmental test carried out under the responsibility of the Operator of nuclear power plants in France, with taking Fessenheim nuclear power plant as an example: permanent monitoring of radioactivity, periodic radioecological assessments, main results of measurements taken, showing that there are no detectable effects of the plant on the environment, policy of openness by publication of these results

  10. Main unit electrical protection at Sizewell 'B' power station

    International Nuclear Information System (INIS)

    Fischer, A.; Keates, T.

    1992-01-01

    For any power station, reliable electrical protection of the main generating units (generators plus generator transformers) has important commercial implications. Spurious trips cause loss of generation and consequent loss of revenue, while failure to rapidly isolate a fault leads to unnecessary damage and again, loss of generation and revenue. While these conditions apply equally to Sizewell B there are additional factors to be taken into consideration. A spurious trip of a main generating unit may lead to a trip of the reactor with an associated challenge to the shutdown and core cooling plant. The generator transformers, besides exporting power from the generators to the 400 kV National Grid, also import power from the Grid to the 11 kV Main Electrical System, which in turn is the preferred source of supply to the Essential Electrical System. The Main Unit Protection is designed to clear generator faults leaving this off-site power route intact. Hence failure to operate correctly could affect the integrity of the Essential Electrical Supplies. (Author)

  11. Electromagnetic compatibility of nuclear power plants

    International Nuclear Information System (INIS)

    Cabayan, H.S.

    1983-01-01

    Lately, there has been a mounting concern about the electromagnetic compatibility of nuclear-power-plant systems mainly because of the effects due to the nuclear electromagnetic pulse, and also because of the introduction of more-sophisticated and, therefore, more-susceptible solid-state devices into the plants. Questions have been raised about the adequacy of solid-state-device protection against plant electromagnetic-interference sources and transients due to the nuclear electromagnetic pulse. In this paper, the author briefly reviews the environment, and the coupling, susceptibility, and vulnerability assessment issues of commercial nuclear power plants

  12. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2005-01-01

    This 2005 edition of the Elecnuc booklet summarizes in tables all numerical data relative to the nuclear power plants worldwide. These data come from the PRIS database managed by the IAEA. The following aspects are reviewed: 2004 highlights; main characteristics of reactor types; map of the French nuclear power plants on 2005/01/01; worldwide status of nuclear power plants at the end of 2004; units distributed by countries; nuclear power plants connected to the grid by reactor-type group; nuclear power plants under construction on 2004; evolution of nuclear power plant capacities connected to the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear power plants by country at the end 2004; performance indicator of PWR units in France; trend of the generation indicator worldwide; 2004 load factor by owners; units connected to the grid by countries at 12/31/2004; status of licence renewal applications in USA; nuclear power plants under construction at 12/31/2004; shutdown reactors; exported nuclear capacity in net MWe; exported and national nuclear capacity connected to the grid; exported nuclear power plants under construction or order; exported and national nuclear capacity under construction or order; recycling of plutonium in LWR; Mox licence plant projects; Appendix - historical development; acronyms, glossary

  13. Affective imagery and acceptance of replacing nuclear power plants.

    Science.gov (United States)

    Keller, Carmen; Visschers, Vivianne; Siegrist, Michael

    2012-03-01

    This study examined the relationship between the content of spontaneous associations with nuclear power plants and the acceptance of using new-generation nuclear power plants to replace old ones. The study also considered gender as a variable. A representative sample of the German- and French-speaking population of Switzerland (N= 1,221) was used. Log-linear models revealed significant two-way interactions between the association content and acceptance, association content and gender, and gender and acceptance. Correspondence analysis revealed that participants who were opposed to nuclear power plants mainly associated nuclear power plants with risk, negative feelings, accidents, radioactivity, waste disposal, military use, and negative consequences for health and environment; whereas participants favoring nuclear power plants mainly associated them with energy, appearance descriptions of nuclear power plants, and necessity. Thus, individuals opposing nuclear power plants had both more concrete and more diverse associations with them than people who were in favor of nuclear power plants. In addition, participants who were undecided often mentioned similar associations to those participants who were in favor. Males more often expressed associations with energy, waste disposal, and negative health effects. Females more often made associations with appearance descriptions, negative feelings, and negative environmental effects. The results further suggest that acceptance of replacing nuclear power plants was higher in the German-speaking part of the country, where all of the Swiss nuclear power plants are physically located. Practical implications for risk communication are discussed. © 2011 Society for Risk Analysis.

  14. Development on database for foreign nuclear power plants

    International Nuclear Information System (INIS)

    Okuda, Yasunori; Yanagi, Chihiro

    1999-01-01

    The Nuclear Information Project in Institute of Nuclear Technology, Institute of Nuclear Safety Systems, Inc. (INSS) has been carrying out two activities related to technical information about nuclear power plants. The first is collection and analysis of accidents and incidents (troubles) of nuclear power plants in U.S.A. and West Europe and making draft of action proposals. The second is collection of main laws, government ordinances, regulatory guides, standard and domestic and international technical news connected with nuclear power plants. This report describes these two data bases about nuclear power plants details. (author)

  15. Transportable nuclear power plant TEC-M with two reactor plants of improved safety

    International Nuclear Information System (INIS)

    Ogloblin, B.G.; Sazonov, A.G.; Svishchev, A.M.; Gromov, B.F.; Zelensky, V.N.; Komkova, O.I.; Sidorov, V.I.; Tolstopyatov, V.P.; Toshinsky, G.I.

    1993-01-01

    Liquid metals are the best to meet the requirements of inherently safety nuclear power plants among the coolants used. A great experience has been gained in lead coolant power plant development and operation as applied to transportable power set-ups. Low chemical activity of this coolant with respect to air-water interaction is a determining factor for this coolant. The transportable nuclear power plant is described. It is intended to generate electric power for populated areas placed a long distance from the main electric power supply sources where it is difficult or not economical to deliver the conventional types of fuel. There are several remote areas in Siberia, Kamchatka in need of this type of power plant

  16. Power plant conceptual studies in Europe

    International Nuclear Information System (INIS)

    Maisonnier, D.; Campbell, D.; Cook, I.; Pace, L. Di; Giancarli, L.; Hayward, J.; Puma, A. Li; Medrano, M.; Norajitra, P.; Roccella, M.; Sardain, P.; Tran, M.Q.; Ward, D.

    2007-01-01

    The European fusion programme is 'reactor oriented' and it is aimed at the successive demonstration of the scientific, the technological and the economic feasibility of fusion power. The European Power Plant Conceptual Study (PPCS) has been a study of conceptual designs of five commercial fusion power plants and the main emphasis was on system integration. It focused on five power plant models which are illustrative of a wider spectrum of possibilities. They are all based on the tokamak concept and they have approximately the same net electrical power output, 1500 MWe. These span a range from relatively near-term, based on limited technology and plasma physics extrapolations, to an advanced conception. The PPCS allows one to clarify the concept of DEMO, the device that will bridge the gap between ITER and the first-of-a-kind fusion power plant. An assessment of the PPCS models with limited extrapolations highlighted a number of issues that must be addressed to establish the DEMO physics and technological basis

  17. Implementation of the Embalse nuclear power plant's commissioning

    International Nuclear Information System (INIS)

    Joseph, M.A.; Duarte, J.C.; Sainz, R.A.

    1987-01-01

    This work points out the main experiences gathered during the Embalse nuclear power plant start-up, which after the first years of operation arise as quite convenient to be taken into account for future nuclear power plants' start-up. (Author)

  18. Nuclear power plant's safety and risk

    International Nuclear Information System (INIS)

    Franzen, L.F.

    1975-01-01

    Starting with a comprehensive safety strategy as evolved over the past years and the present legal provisions for the construction and operation of nuclear power plants, the risk of the intended operation, of accidents and unforeseen events is discussed. Owing to the excellent safety record of nuclear power plants, main emphasis in discussing accidents is given to the precautionary analysis within the framework of the licensing procedure. In this context, hypothetical accidents are mentioned only as having been utilized for general risk comparisons. The development of a comprehensive risk concept for a completely objective safety assessment of nuclear power plants remains as a final goal. (orig.) [de

  19. Elecnuc. Nuclear power plants in the world. 1997

    International Nuclear Information System (INIS)

    Maubacq, F.; Tailland, C.

    1997-04-01

    This small booklet provides information about all type of nuclear power plants worldwide. It is based on the data taken from the CEA/DSE/SEE Elecnuc database. The content comprises: the 1996 highlights, the main characteristics of the different type of reactors in operation or under construction, the map of the French nuclear power plant sites, the worldwide status of nuclear power plants at the end of 1996, the nuclear power plants in operation, under construction or on order (by groups of reactor-types), the power capacity evolution of power plants in operation, the net and gross capacity of the power plants on the grid, the commercial operation and grid connection forecasts, the first achieved or expected power generation supplied by a nuclear reactor for each country and the power generation from nuclear reactors, the performance indicator of the PWR units in France, the trends of the power generation indicator worldwide, the nuclear power plants in operation, under construction, on order, planned, cancelled, decommissioned and exported worldwide, the schedule of steam generator replacements, and the MOX fuel plutonium recycling programme. (J.S.)

  20. Auxiliary feedwater system risk-based inspection guide for the Maine Yankee Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gore, B.F.; Vo, T.V.; Moffitt, N.E.; Bumgardner, J.D.

    1992-10-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. The information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Maine Yankee was selected as one of a series of plants for study. ne product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Maine Yankee plant

  1. Practical application of the benchmarking technique to increase reliability and efficiency of power installations and main heat-mechanic equipment of thermal power plants

    Science.gov (United States)

    Rimov, A. A.; Chukanova, T. I.; Trofimov, Yu. V.

    2016-12-01

    facilitating the analysis of the benchmarking results permitting to represent the quality loss of this power installation in the form of the difference between the actual value of the key indicator or comparison indicator and the best quartile of the existing distribution. The uncertainty of the obtained values of the quality loss indicators was evaluated by transforming the standard uncertainties of the input values into the expanded uncertainties of the output values with the confidence level of 95%. The efficiency of the technique is demonstrated in terms of benchmarking of the main thermal and mechanical equipment of the extraction power-generating units T-250 and power installations of the thermal power plants with the main steam pressure 130 atm.

  2. Fuzzy logic control of nuclear power plant

    International Nuclear Information System (INIS)

    Yao Liangzhong; Guo Renjun; Ma Changwen

    1996-01-01

    The main advantage of the fuzzy logic control is that the method does not require a detailed mathematical model of the object to be controlled. In this paper, the shortcomings and limitations of the model-based method in nuclear power plant control were presented, the theory of the fuzzy logic control was briefly introduced, and the applications of the fuzzy logic control technology in nuclear power plant controls were surveyed. Finally, the problems to be solved by using the fuzzy logic control in nuclear power plants were discussed

  3. Modernization of electric power systems of the Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gabaldon, M. A.; Gonzalez, J. J.; Prieto, I.

    2011-01-01

    The Power Increase Project of Laguna Verde Nuclear Plant has entailed the replacement, in one unique outage, of the main power electrical systems of the Plant (Isolated Phase Bars, Generator Circuit Breaker and Main Transformer) as well as the replacement of the Turbo-group. The simultaneous substitution of these entire system has never been done by any other Plant in the world, representing an engineering challenge that embraced the design of the new equipment up to the planning, coordination and management of the construction and commissioning works, which were successfully carried out by Iberdrola within the established outage period /47 days) for both units. (Author)

  4. An Embalse nuclear power plant basic principles simulator

    International Nuclear Information System (INIS)

    Fernandez, Oscar; Galdoz, Erwin; Flury, Celso; Fontanini, Horacio

    1989-01-01

    A nuclear power plant basic principles simulator is a package of programs that numerically solve the dynamic equations of the simulated plant. This kind of tools is mainly used in the first step of training of operational personnel, to allow mental representation of physical phenomena governing the plant. They are also used for students or professional training, and experienced operators can also improve there performance under abnormal operation situations using the simulator. For the Embalse nuclear power plant, mainly the thermohydraulic behaviour, is simulated. The mathematical model was adapted from MANUVR, a code developed at the Electric Systems and Control Department of the National Atomic Energy Commission (CNEA). (Author) [es

  5. Nuclear power plant V-2

    International Nuclear Information System (INIS)

    1998-01-01

    The nuclear power plant Bohunice V -2 is briefly described. This NPP consists from two reactor units. Their main time characteristics are (Reactor Unit 1, Reactor Unit 2): beginning of construction - December 1976; first controlled reactor power - 7 August 1984, 2 August 1985; connection to the grid - 20 August 1984, 9 August 1985; commercial operation - 14 February 1985, 18 December 1985. This leaflet contains: NPP V-2 construction; Major technological equipment [WWER 440 V230 type reactor; Nuclear Power plant operation safety (Safety barriers; Safety systems [Active safety systems, Passive safety systems]); Centralized heat supply system; Scheme of Bohunice V-2 NPP and technical data

  6. Nuclear power plants

    International Nuclear Information System (INIS)

    1985-01-01

    Data concerning the existing nuclear power plants in the world are presented. The data was retrieved from the SIEN (Nuclear and Energetic Information System) data bank. The information are organized in table forms as follows: nuclear plants, its status and type; installed nuclear power plants by country; nuclear power plants under construction by country; planned nuclear power plants by country; cancelled nuclear power plants by country; shut-down nuclear power plants by country. (E.G.) [pt

  7. LNG plant combined with power plant

    Energy Technology Data Exchange (ETDEWEB)

    Aoki, I; Kikkawa, Y [Chiyoda Chemical Engineering and Construction Co. Ltd., Tokyo (Japan)

    1997-06-01

    The LNG plant consumers a lot of power of natural gas cooling and liquefaction. In some LNG plant location, a rapid growth of electric power demand is expected due to the modernization of area and/or the country. The electric power demand will have a peak in day time and low consumption in night time, while the power demand of the LNG plant is almost constant due to its nature. Combining the LNG plant with power plant will contribute an improvement the thermal efficiency of the power plant by keeping higher average load of the power plant, which will lead to a reduction of electrical power generation cost. The sweet fuel gas to the power plant can be extracted from the LNG plant, which will be favorable from view point of clean air of the area. (Author). 5 figs.

  8. LNG plant combined with power plant

    International Nuclear Information System (INIS)

    Aoki, I.; Kikkawa, Y.

    1997-01-01

    The LNG plant consumers a lot of power of natural gas cooling and liquefaction. In some LNG plant location, a rapid growth of electric power demand is expected due to the modernization of area and/or the country. The electric power demand will have a peak in day time and low consumption in night time, while the power demand of the LNG plant is almost constant due to its nature. Combining the LNG plant with power plant will contribute an improvement the thermal efficiency of the power plant by keeping higher average load of the power plant, which will lead to a reduction of electrical power generation cost. The sweet fuel gas to the power plant can be extracted from the LNG plant, which will be favorable from view point of clean air of the area. (Author). 5 figs

  9. Exergy analysis of a cogeneration power plant

    International Nuclear Information System (INIS)

    Núñez Bosch, Osvaldo Manuel

    2015-01-01

    In the following study exergetic evaluation of a cogeneration power plant in operation with installed electrical capacity of 24 MW and process heat demand of 190 MW it is performed. The main objective of the research was to determine the influence of the increase in power generation capacity, raising the superheated steam parameters and the number of regenerative heaters on the second law efficiency and irreversibilities in the different components of the plant. To study the power plant was divided into subsystems: steam generator blowdown expander, main steam pipe, steam turbine regenerative heaters, reduction system, deaerator and pumps. The study results show that exergy losses and irreversibilities differ widely from one subsystem to another. In general, the total irreversibility accounted for 70.7% of primary fuel availability. The steam generator subsystem had the highest contribution to the irreversibility of the plant by 54%. It was determined that the increased steam parameters helps reduce the irreversibility and increase the exergetic efficiency of installation. The suppression of the reduction and incorporation of extraction-condensing turbine produce the same effect and helps to reduce power consumption from the national grid. Based on the results recommendations for improving plant efficiency are made. (full text)

  10. Simulation technology for power plants

    International Nuclear Information System (INIS)

    Kuwabara, Kazuo; Yanai, Katsuya.

    1988-01-01

    In the simulation of nuclear power stations, there are the simulation for the training of plant operation, the plant simulation for analyzing the operation of an electric power system, the simulation for controlling a core, the simulation for the safety analysis of reactors, the simulation for the design analysis of plants and so on as the typical ones. The outline and the technical features of these simulations are described. With the increase of capacity and complexity of thermal power plants, recently the automation of operation has advanced rapidly. The chance of starting up and stopping plants by operators themselves is few, and the chance of actually experiencing troubles also is few as the reliability of plants improved. In order to maintain the ability of coping with plant abnormality, an operation supporting system is strongly demanded. Operation training simulators and used widely now, and there are the simulators for analysis, those of replica type, those of versatile compact type and so on. The system configuration, modeling techniques, training function and others of the replica type are explained. In hydroelectric plants, the behavior of water in penstocks, the characteristics of water turbines, the speed control system for water turbines and the characteristics of generators become the main subjects of simulation. These are described. (Kako, I.)

  11. DCS cabinet power loss analysis for CPR1000 nuclear power plant

    International Nuclear Information System (INIS)

    Zhou Liang; Zhao Yanfeng; Sun Yongbin

    2014-01-01

    The DCS overall structure of CRP1000 nuclear power plant was introduced. Based on the RPC, the signal interface character and signal processing mechanism on the key root were analyzed. By the power loss analyzing of RPC, the RPC loss power may lead reactor trip signal from anticipated transient without scram (ATWS) system. The results indicate that it is necessary to search DCS cabinet power loss analysis. Optimizing and assigning the main water flow signals can avoid trigger reactor trip signal by mistake. The DCS cabinet power loss analysis can optimize the I and C (instrumentation and control) design and increase the nuclear plant's reliability. (authors)

  12. Nuclear power station main control room habitability

    International Nuclear Information System (INIS)

    Paschal, W.B.; Knous, W.S.

    1989-01-01

    The main control room at a nuclear power station must remain habitable during a variety of plant conditions and postulated events. The control room habitability requirement and the function of the heating, ventilating, air-conditioning, and air treatment system are to control environmental factors, such as temperature, pressure, humidity, radiation, and toxic gas. Habitability requirements provide for the safety of personnel and enable operation of equipment required to function in the main control room. Habitability as an issue has been gaining prominence with the Advisor Committee of Reactor Safeguards and the Nuclear Regulatory Commission since the incident at Three Mile Island. Their concern is the ability of the presently installed habitability systems to control the main control room environment after an accident. This paper discusses main control room HVAC systems; the concern, requirements, and results of NRC surveys and notices; and an approach to control room habitability reviews

  13. Construction-man hour estimation for nuclear power plants

    International Nuclear Information System (INIS)

    Paek, J.H.

    1987-01-01

    This study centers on a statistical analysis of the preliminary construction time, main construction time, and total construction man hours of nuclear power plants. The use of these econometric techniques allows the major man hour driving variables to be identified through multivariate analysis of time-series data on over 80 United States nuclear power plants. The analysis made in this study provides a clearer picture of the dynamic changes that have occurred in the man hours of these plants when compared to engineering estimates of man hours, and produces a tool that can be used to project nuclear power plant man hours

  14. Radiochemistry in nuclear power plants

    International Nuclear Information System (INIS)

    Schwarz, W.

    2007-01-01

    Radiochemistry is employed in nuclear power plants not as an end in itself but, among other things, as a main prerequisite of optimum radiation protection. Radiochemical monitoring of various loops provides important information about sources of radioactivity, activity distribution in the plant and its changes. In the light of these analytical findings, plant crews are able to take measures having a positive effect on radiation levels in the plant. The example of a BWR plant is used to show, among other things, how radiochemical analyses helped to reduce radiation levels in a plant and, as a consequence, to decrease clearly radiation exposure of the personnel despite higher workloads. (orig.)

  15. A trend to small nuclear power plants?

    International Nuclear Information System (INIS)

    Lameira, Fernando Soares

    2000-01-01

    The release of fossil fuel greenhouse gases and the depletion of cheap oil reserves outside the Persic Gulf suggest a promising scenario for the future of nuclear power. But the end of the Cold War, the crisis of the state, axiological questions and globalization may lead to a marked for small power plants. The purpose of this paper is to analyze these factors, since they are not always considered all together in the future scenarios for nuclear power. It is concluded that the current evolutionary trend of nuclear power projects toward big plants may become one of the main barriers for the introduction of new plants in the future. It is suggested that a combination of fission reactors with technologies unavailable in the 1950's, when the design characteristics of the current nuclear power plants were established, could be considered to overcome this barrier. (author)

  16. Power plant perspectives for sugarcane mills

    International Nuclear Information System (INIS)

    Bocci, E.; Di Carlo, A.; Marcelo, D.

    2009-01-01

    Biomass, integral to life, is one of the main energy sources that modern technologies could widely develop, overcoming inefficient and pollutant uses. The sugarcane bagasse is one of the more abundant biomass. Moreover, the fluctuating sugar and energy prices force the sugarcane companies to implement improved power plants. Thanks to a multiyear collaboration between University of Rome and University of Piura and Chiclayo, this paper investigates, starting from the real data of an old sugarcane plant, the energy efficiency of the plant. Furthermore, it explores possible improvements as higher temperature and pressure Rankine cycles and innovative configurations based on gasifier plus hot gas conditioning and gas turbine or molten carbonate fuel cells. Even if the process of sugar extraction from sugarcane and the relative Rankine cycles power plants are well documented in literature, this paper shows that innovative power plant configurations can increase the bagasse-based cogeneration potential. Sugarcane companies can become electricity producers, having convenience in the use of sugarcane leaves and trash (when it is feasible). The worldwide implementation of advanced power plants, answering to a market competition, will improve significantly the renewable electricity produced, reducing CO 2 emissions, and increasing economic and social benefits.

  17. Applicability of the 'constructional fire prevention for industrial plants' to power plants

    International Nuclear Information System (INIS)

    Hammacher, P.

    1978-01-01

    Power plants, especially nuclear power plants, are considered because of their high value and large construction volume to be among the most important industrial constructions of our time. They have a very exposed position from the point of view of fire prevention because of their constructional and operational concept. The efforts in the Federal Republic of Germany to standardize laws and regulations for fire prevention in industrial plants (industrial construction code, DIN 18230) must be supported if only because they would simplify the licensing procedure. However these regulations cannot be applied in many cases and especially in the main buildings of thermal power plants without restricting or even endangering the function or the safety of such plants. At the present state of the art many parts of the power plant can surely be defined as 'fire safe'. Fire endangered plant components and rooms are protected according to their importance by different measures (constructional measures, fire-fighting equipments, extractors for flue gases and for heat, fire-brigade of the plant). (orig.) [de

  18. An Investigation for Arranging the Video Display Unit Information in a Main Control Room of Advanced Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, Chong Cheng; Yang, Chih Wei [Institute of Nuclear Energy Research, Atomic Energy Council, Taoyuan (China)

    2014-08-15

    Current digital instrumentation and control and main control room (MCR) technology has extended the capability of integrating information from numerous plant systems and transmitting needed information to operations personnel in a timely manner that could not be envisioned when previous generation plants were designed and built. A MCR operator can complete all necessary operating actions on the video display unit (VDU). It is extremely flexible and convenient for operators to select and to control the system display on the screen. However, a high degree of digitalization has some risks. For example, in nuclear power plants, failures in the instrumentation and control devices could stop the operation of the plant. Human factors engineering (HFE) approaches would be a manner to solve this problem. Under HFE considerations, there exists 'population stereotype' for operation. That is, the operator is used to operating a specific display on the specific VDU for operation. Under emergency conditions, there is possibility that the operator will response with this habit population stereotype, and not be aware that the current situation has already changed. Accordingly, the advanced nuclear power plant should establish the MCR VDU configuration plan to meet the consistent teamwork goal under normal operation, transient and accident conditions. On the other hand, the advanced nuclear power plant should establish the human factors verification and validation plan of the MCR VDU configuration to verify and validate the configuration of the MCR VDUs, and to ensure that the MCR VDU configuration allows the operator shift to meet the HFE consideration and the consistent teamwork goal under normal operation, transient and accident conditions. This paper is one of the HF V V plans of the MCR VDU configuration of the advanced nuclear power plant. The purpose of this study is to confirm whether the VDU configuration meets the human factors principles and the consistent

  19. An Investigation for Arranging the Video Display Unit Information in a Main Control Room of Advanced Nuclear Power Plants

    International Nuclear Information System (INIS)

    Hsu, Chong Cheng; Yang, Chih Wei

    2014-01-01

    Current digital instrumentation and control and main control room (MCR) technology has extended the capability of integrating information from numerous plant systems and transmitting needed information to operations personnel in a timely manner that could not be envisioned when previous generation plants were designed and built. A MCR operator can complete all necessary operating actions on the video display unit (VDU). It is extremely flexible and convenient for operators to select and to control the system display on the screen. However, a high degree of digitalization has some risks. For example, in nuclear power plants, failures in the instrumentation and control devices could stop the operation of the plant. Human factors engineering (HFE) approaches would be a manner to solve this problem. Under HFE considerations, there exists 'population stereotype' for operation. That is, the operator is used to operating a specific display on the specific VDU for operation. Under emergency conditions, there is possibility that the operator will response with this habit population stereotype, and not be aware that the current situation has already changed. Accordingly, the advanced nuclear power plant should establish the MCR VDU configuration plan to meet the consistent teamwork goal under normal operation, transient and accident conditions. On the other hand, the advanced nuclear power plant should establish the human factors verification and validation plan of the MCR VDU configuration to verify and validate the configuration of the MCR VDUs, and to ensure that the MCR VDU configuration allows the operator shift to meet the HFE consideration and the consistent teamwork goal under normal operation, transient and accident conditions. This paper is one of the HF V V plans of the MCR VDU configuration of the advanced nuclear power plant. The purpose of this study is to confirm whether the VDU configuration meets the human factors principles and the consistent

  20. Nuclear power plants in the world - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. These data come from the IAEA's PRIS and AREVA-CEA's GAIA databases. The following aspects are reviewed: 2009 highlights, Main characteristics of reactor types, Map of the French nuclear power plants on 2010/01/01, Worldwide status of nuclear power plants (12/31/2009), Units distributed by countries, Nuclear power plants connected to the Grid- by reactor type groups, Nuclear power plants under construction on 2009, Evolution of nuclear power plants capacities connected to the grid, First electric generations supplied by a nuclear unit in each country, Electrical generation from nuclear power plants by country at the end 2009, Performance indicator of french PWR units, Evolution of the generation indicators worldwide by type, Nuclear operator ranking according to their installed capacity, Units connected to the grid by countries at 12/31/2009, Status of licence renewal applications in USA, Nuclear power plants under construction at 12/31/2009, Shutdown reactors, Exported nuclear capacity in net MWe, Exported and national nuclear capacity connected to the grid, Exported nuclear power plants under construction, Exported and national nuclear capacity under construction, Nuclear power plants ordered at 12/31/2009, Long term shutdown units at 12/31/2009, COL applications in the USA, Recycling of Plutonium in reactors and experiences, Mox licence plants projects, Appendix - historical development, Meaning of the used acronyms, Glossary

  1. Are atomic power plants saver than nuclear power plants

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1977-01-01

    It is rather impossible to establish nuclear power plants against the resistance of the population. To prevail over this resistance, a clarification of the citizens-initiatives motives which led to it will be necessary. This is to say: It is quite impossible for our population to understand what really heappens in nuclear power plants. They cannot identify themselves with nuclear power plants and thus feel very uncomfortable. As the total population feels the same way it is prepared for solidarity with the citizens-initiatives even if they believe in the necessity of nuclear power plants. Only an information-policy making transparent the social-psychological reasons of the population for being against nuclear power plants could be able to prevail over the resistance. More information about the technical procedures is not sufficient at all. (orig.) [de

  2. Problems of nuclear power plant safety evaluation

    International Nuclear Information System (INIS)

    Suchomel, J.

    1977-01-01

    Nuclear power plant safety is discussed with regard to external effects on the containment and to the human factor. As for external effects, attention is focused on shock waves which may be due to explosions or accidents in flammable material transport and storage, to missiles, and to earthquake effects. The criteria for evaluating nuclear power plant safety in different countries are shown. Factors are discussed affecting the reliability of man with regard to his behaviour in a loss-of-coolant accident in the power plant. Different types of PWR containments and their functions are analyzed, mainly in case of accident. Views are discussed on the role of destructive accidents in the overall evaluation of fast reactor safety. Experiences are summed up gained with the operation of WWER reactors with respect to the environmental impact of the nuclear power plants. (Z.M.)

  3. New materials for boilers in USC power plants

    International Nuclear Information System (INIS)

    Hong, Sung Ho; Hong, Seok Joo

    2003-01-01

    The efficiency of boiler in fossil power plants is a strong function of steam temperature and pressure. Thus, the main technology of increasing boiler efficiency is the development of stronger high temperature materials, capable of operating under high stresses at ever increasing temperature. This paper will presents the new material relating to boiler of USC power plant

  4. Research on transfer rule of the monitoring of operator in digital main control room of nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Li Linfeng; Li Pengcheng; Lu Changshen; Huang Weigang; Dai Zhonghua; Huang Yuanzheng; Chen Qingqing

    2013-01-01

    In the digital main control room of nuclear power plants, monitoring the operating status of the system of reactor is not only one of the most important tasks of the operators, but also the basis and premise of controlling the system of reactor running correctly. After analyzing, inducing, summarizing the data obtained, we found the operators' monitor behavior could be classified as procedure transfer, abnormal transfer, and exchange transfer. The times of exchange transfer is 29% of the total transfer times, abnormal transfer is 14%, regulation transfer is 36%, and others are 21%. (authors)

  5. Decommissioning of building part of nuclear power plant

    International Nuclear Information System (INIS)

    Sochor, R.

    1988-01-01

    The characteristics are discussed using literature data of building work during decommissioning or reconstruction of nuclear power plants. The scope of jobs associated with power plant decommissioning is mainly given by the size of contaminated parts, intensity of radioactivity, the volume of radioactive wastes and the possible building processes. Attention is devoted to the cost of such jobs and the effect of the plant design on cost reduction. (Z.M.). 6 refs

  6. Caorso - the first of the new generation of Italian nuclear power plants

    International Nuclear Information System (INIS)

    Rousek, J.

    1976-01-01

    The time schedule of the construction, the sub-contractors supplying the main parts of the nuclear power plant, and the technical parameters of the CAORSO power plant are given. The nuclear and the conventional part of the power plant and its connection to the power supply and the preparation of plant operation are described. (J.P.)

  7. Employing modern power plant simulators in nuclear power plants

    International Nuclear Information System (INIS)

    Niedorf, V.; Storm, J.

    2005-01-01

    At the present state of the art, modern power plant simulators are characterized by new qualitative features, thus enabling operators to use them far beyond the traditional field of training. In its first part, this contribution presents an overview of the requirements to be met by simulators for multivalent uses. In part two, a survey of the uses and perspectives of simulation technology in power plants is presented on the basis of experience accumulated by Rheinmetall Defence Electronics (RDE).Modern simulators are shown to have applications by far exceeding traditional training areas. Modular client - sever systems on standard computers allow inexpensive uses to be designed at several levels, thus minimizing maintenance cost. Complex development and running time environments, like the SEMS developed by RDE, have made power plant simulators the workhorses of power plant engineers in all power plant areas. (orig.)

  8. Combined compressed air storage-low BTU coal gasification power plant

    Science.gov (United States)

    Kartsounes, George T.; Sather, Norman F.

    1979-01-01

    An electrical generating power plant includes a Compressed Air Energy Storage System (CAES) fueled with low BTU coal gas generated in a continuously operating high pressure coal gasifier system. This system is used in coordination with a continuously operating main power generating plant to store excess power generated during off-peak hours from the power generating plant, and to return the stored energy as peak power to the power generating plant when needed. The excess coal gas which is produced by the coal gasifier during off-peak hours is stored in a coal gas reservoir. During peak hours the stored coal gas is combined with the output of the coal gasifier to fuel the gas turbines and ultimately supply electrical power to the base power plant.

  9. Subsequent flue gas desulfurization of coal-fired power plant units

    International Nuclear Information System (INIS)

    Willibal, U.; Braun, Gy.

    1998-01-01

    The presently operating coal-fired power plant in Hungary do not satisfy the pollution criteria prescribed by the European Union norms. The main polluting agent is the sulfur dioxide emitted by some of the power plants in Hungary in quantities over the limit standards. The power plant units that are in good operating state could be made competitive by using subsequent desulfurization measures. Various flue gas desulfurization technologies are presented through examples that can be applied to existing coal-fired power plants. (R.P.)

  10. Mechanical seals qualification procedure of the main pumps of nuclear power plants in France

    International Nuclear Information System (INIS)

    Buchdahl, D.; Martin, R.; Girault, J.M.

    1992-12-01

    Many important pumps in the nuclear power plants are equipped with mechanical seals. The good behaviour and reliability of mechanical seals depend specially on the quality and the stability of an interface of several microns. Peripheral speed reaches 50 m/s and pressure 5 MPa, shaft diameter may be 200 mm. Any failure of the mechanical seals may stop the production of electricity or may compromise nuclear safety. As far back as 1970, EDF has conducted qualification actions for the most important mechanical seals in terms of availability and safety. A qualification of mechanical seals needs three steps: - constructor test (tuning) at normal conditions, -qualification test on test rig at EDF/DER (semi-industrial) at normal, exceptional and incidental conditions lasting about 1500 h, - industrial qualification test in nuclear power station over one year. Several supplying sources are absolutely necessary. Any pump may receive mechanical seals from at least two different suppliers. A compromise had to be found to restrict the suppliers' number down to three. This choice concerned three high technology suppliers. A consistent modification procedure had been developed (references file procedure). For each power plant series, about ten types of mechanical seals are concerned. The selection criteria are the higher loads factors P, Vg or the safety related importance. This expensive approach is useful for EDF, many functional failures have been detected before the serial mechanical seals installation in the power plants. (authors). 1 annexe

  11. Role and position of Nuclear Power Plants Research Institute in nuclear power industry

    International Nuclear Information System (INIS)

    Metke, E.

    1984-01-01

    The Nuclear Power Plants Research Institute carries out applied and experimental research of the operating states of nuclear power plants, of new methods of surveillance and diagnosis of technical equipment, it prepares training of personnel, carries out tests, engineering and technical consultancy and the research of automated control systems. The main research programme of the Institute is the rationalization of raising the safety and operating reliability of WWER nuclear power plants. The Institute is also concerned with quality assurance of selected equipment of nuclear power plants and assembly works, with radioactive waste disposal and the decommissioning of nuclear power plants as well as with the preparation and implementation of the nuclear power plant start-up. The Research Institute is developing various types of equipment, such as equipment for the decontamination of the primary part of the steam generator, a continuous analyzer of chloride levels in water, a gas monitoring instrument, etc. The prospects are listed of the Research Institute and its cooperation with other CMEA member countries. (M.D.)

  12. Analysis of future nuclear power plants competitiveness with stochastic methods

    International Nuclear Information System (INIS)

    Feretic, D.; Tomsic, Z.

    2004-01-01

    To satisfy the increased demand it is necessary to build new electrical power plants, which could in an optimal way meet, the imposed acceptability criteria. The main criteria are potential to supply the required energy, to supply this energy with minimal (or at least acceptable) costs, to satisfy licensing requirements and be acceptable to public. The main competitors for unlimited electricity production in next few decades are fossil power plants (coal and gas) and nuclear power plants. New renewable power plants (solar, wind, biomass) are also important but due to limited energy supply potential and high costs can be only supplement to the main generating units. Large hydropower plans would be competitive under condition of existence of suitable sites for construction of such plants. The paper describes the application of a stochastic method for comparing economic parameters of future electrical power generating systems including conventional and nuclear power plants. The method is applied to establish competitive specific investment costs of future nuclear power plants when compared with combined cycle gas fired units combined with wind electricity generators using best estimated and optimistic input data. The bases for economic comparison of potential options are plant life time levelized electricity generating costs. The purpose is to assess the uncertainty of several key performance and cost of electricity produced in coal fired power plant, gas fired power plant and nuclear power plant developing probability distribution of levelized price of electricity from different Power Plants, cumulative probability of levelized price of electricity for each technology and probability distribution of cost difference between the technologies. The key parameters evaluated include: levelized electrical energy cost USD/kWh,, discount rate, interest rate for credit repayment, rate of expected increase of fuel cost, plant investment cost , fuel cost , constant annual

  13. NOKIA - nuclear power plant monitoring system

    International Nuclear Information System (INIS)

    Anon.

    The monitoring system is described developed specially for the LOVIISA-1 and -2 nuclear power plants with two WWER-440 units. The multiprocessor system of the WWER-440 contains 3 identical main computers. The in core instrumentation is based on stationary self-powered neutron detectors and on thermocouples for measuring the coolant temperature. The system has equipment for the automatic control of the insulation resistance of the self-powered detectors. It is also equipped with a wide range of standard and special programmes. The standard programmes permit the recording of analog and digital data at different frequencies depending on the pre-set requirements. These data are processed and form data files which are accessible from all programmes. The heart of the special programme is a code for the determination of the power distribution in the core of the WWER-440 reactor. The main part of the programme is the algorithm for computing measured neutron fluxes derived from the signals of the self-powered detectors and the algorithm for deriving the global distribution of the neutron flux in the core. The computed power distribution is used for the determination of instantaneous thermal loads and the distribution of burnup in the core. The production programme of the FINNATOM company for nuclear power plants is listed. (B.S.)

  14. Factors analysis of water hammer in FLOWMASTER for main feedwater systems of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Wang Xin; Han Weishi

    2010-01-01

    The main feedwater system of a nuclear power plant (NPP) is an important part in ensuring the cooling of a steam generator. It is the main pipe section where water hammers frequently occur. Studying the regulator patterns of water hammers in the main feedwater systems is significant to the stable operation of the system. This article focuses on a parametric study to avoid the consequences of water hammer effect in PWR by employing a general purpose fluid dynamic simulation software-FLOWMASTER. Through FLOWMASTER's transient calculating functions, a mathematical model is established with boundary conditions such as feedwater pumps, control valves, etc., calculations of water hammer pressure when feedwater pumps and control valves shut down, and simulations during instantaneous changes in water hammer pressure. Combining a plethora of engineering practical examples, this research verified the viability of calculating water hammer pressure through FLOWMASTER's transient functions and we found out that, increasing the periods of closure of control valves and feedwater pumps control water hammers effectively. We also found out that changing the intervals of closing signals to feedwater pumps and control valves aid to relieve hydraulic impact. This could be a guideline for practical engineering design and system optimization. (author)

  15. Seismic safety of nuclear power plants

    International Nuclear Information System (INIS)

    Guerpinar, A.; Godoy, A.

    2001-01-01

    This paper summarizes the work performed by the International Atomic Energy Agency in the areas of safety reviews and applied research in support of programmes for the assessment and enhancement of seismic safety in Eastern Europe and in particular WWER type nuclear power plants during the past seven years. Three major topics are discussed; engineering safety review services in relation to external events, technical guidelines for the assessment and upgrading of WWER type nuclear power plants, and the Coordinated Research Programme on 'Benchmark study for the seismic analysis and testing of WWER type nuclear power plants'. These topics are summarized in a way to provide an overview of the past and present safety situation in selected WWER type plants which are all located in Eastern European countries. Main conclusion of the paper is that although there is now a thorough understanding of the seismic safety issues in these operating nuclear power plants, the implementation of seismic upgrades to structures, systems and components are lagging behind, particularly for those cases in which the re-evaluation indicated the necessity to strengthen the safety related structures or install new safety systems. (author)

  16. Stakeholder involvement in the decommissioning of Trojan and Maine Yankee nuclear power plants

    International Nuclear Information System (INIS)

    Watson, Bruce A.; Orlando, Dominick A.

    2006-01-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in the decommissioning planning, the conduct of decommissioning operations, the volume of low-level radioactive waste, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated its 10 CFR Part 50 license. Maine Yankee elected to reduce the 10 CFR Part 50 license to only the requirements for the ISFSI. While the NRC regulations are flexible and allow different approaches to ISFSI licensing, there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, stakeholder and public input resulted in the licensee entering into an agreement with a citizen group and resulted in State legislation that lowered the dose limit below the NRC radiological criteria of 0.25 milli-Sievert/year (mSv/yr) (25 mrem/yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs) that were well below the NRC DCGL screening values. This contributed to

  17. Chemistry in power plants 2011

    International Nuclear Information System (INIS)

    2011-01-01

    Within the VGB Powertech conference from 25th to 27th October, 2011, in Munich (Federal Republic of Germany), the following lectures and poster contributions were presented: (1) The revised VGB standard for water-steam-cycle Chemistry; (2) Switchover from neutral operation to oxygen treatment at the power station Stuttgart-Muenster of EnBW Kraftwerke AG; (3) Steam contamination with degradation products of organic matters present in the feedwater of the Lanxess-Rubber cogeneration plant; (4) Laboratory scale on-line noble metal deposition experiments simulating BWR plant conditions; (5) Building a new demin installation for the power plant EPZ in Borssele; (6) Replacement of the cooling tower installations in the nuclear power plant Goesgen-Daenien AG; (7) Aging of IEX resins in demin plants - Cost optimisation by adaptation of regenerants; (8) The largest DOW trademark EDI System at a combined cycled plant in Europe; (9) Upgrading river Main water to boiler feed water - Experiences with ultrafiltration; (10) Experiences with treatment of the water-steam-cycle in the RDF power plant Nehlsen Stavenhagen with film-forming amines; (11) Comparative modelling of the bubbles thermal collapse and cavitations for estimation of bubbles collapse influence; (12) Overcoming the steam quality - issues from an HRSG for the production of process steam; (13) Legionella - new requirements for power plant operation; (14) How the right chemistry in the FGD helps to improve the removal in the waste water treatment plant; (15) High efficiency filtration in dry/semi-dry FGD plants; (16) Expanding the variety of renewable fuels in the biomass power plant Timelkam using the chemical input control; (17) Corrosion, operating experiences and process improvements to increase the availability and operating time of the biomass power plant Timelkam; (18) The influence of temperature on the measurement of the conductivity of highly diluted solutions; (19) A multiparameter instrumentation approach

  18. Kansas Power Plants

    Data.gov (United States)

    Kansas Data Access and Support Center — The Kansas Power Plants database depicts, as point features, the locations of the various types of power plant locations in Kansas. The locations of the power plants...

  19. Systematic safety evaluation of old nuclear power plants

    International Nuclear Information System (INIS)

    Dredemis, G.; Fourest, B.

    1984-01-01

    The French safety authorities have undertaken a systematic evaluation of the safety of old nuclear power plants. Apart from a complete revision of safety documents (safety analysis report, general operating rules, incident and accident procedures, internal emergency plan, quality organisation manual), this examination consisted of analysing the operating experience of systems frequently challenged and a systematic examination of the safety-related systems. This paper is based on an exercise at the Ardennes Nuclear Power Plant which has been in operation for 15 years. This paper also summarizes the main surveys and modifications relating to this power plant. (orig.)

  20. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1981-01-01

    This lecture presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis, outlines the main reasons for the reliable performance of Swiss nuclear power plants and explains the management function as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability. (orig./RW)

  1. The German risk study for nuclear power plants

    International Nuclear Information System (INIS)

    Birkhofer, A.

    1980-01-01

    In August 1979 results of the ''German Risk Study for Nuclear Power Plants'' were published. The Main Report, in which approach and results of the study are documented, has been available since the end of 1979. It was the charter of the study - which was performed on behalf of the Minister of Research and Technology of the Federal Republic of Germany - to apply as far as possible the methods of the US Reactor Safety Study (WASH-1400) to German plant and site conditions. A direct transfer of the results was not deemed justified, mainly for the following reasons: There is quite a number of differences between the design of the reference plants of WASH-1400 (Surry-1, Peach Bottom-2) and German nuclear power plants. The mean population density in the Federal Republic of Germany is more than ten times of the United States. In the vicinity of nuclear power plants the ratio is about 3:1. To calculate the collective risk resulting from reactor accidents, a total of 25 plants at 19 different sites in the Federal Republic of Germany were considered. This included all plants with 600 MW or more electrical output, which were in operation, under construction or in licensing process by July 1, 1977. As an approximation to the real situation, it has been assumed that all 25 plants are technically identical to the reference plant

  2. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  3. Planting on the slope of Yangjiang nuclear power plant by spraying combined materials

    International Nuclear Information System (INIS)

    Li Ning

    2010-01-01

    During the development and construction of nuclear power projects, in order to prevent ecological degradation and soil erosion of slope hazards, taking practical measures in the works or plant is particularly important. through the main high slope green field application of Yangjiang nuclear power plant, introducing mixed vegetation spraying techniques and characteristics of the construction process, for similar projects it is also a good guide. (author)

  4. Review of nuclear power plant systems

    International Nuclear Information System (INIS)

    Doehler

    1980-01-01

    This presentation starts with a brief description of the Technischer Ueberwachungs-Verein (TUeV) and its main activities in the field of technical assessments. The TUeV-organisation is in general the assessor who performs the review if nuclear power plant systems, structures and equipment. All aspects relating to the safe operation of nuclear power plants are assessed by the TUeV. This paper stresses the review of the design of nuclear power plant systems and structures. It gives an outline on the procedure of an assessment, starting with the regulatory requirements, going into the papers of the applicant and finally ending with the TUeV-appraisal. This procedure is shown using settlement measuring requirements as an example. The review of the design of mechanical structures such as pipes, valves, pump and vessels is shown in detail. (RW)

  5. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  6. Calculation of transients in WWER power plant

    International Nuclear Information System (INIS)

    Macek, J.; Kyncl, M.

    1981-01-01

    A mathematical model is described for the computation of transient processes in a nuclear power plant as is the DYNAMIKA computer program. The program is used for computing two accident variants: rupture of the main steam collector and a failure of the main circulating pump. (H.S.)

  7. Integral Indicator of Ecological Footprint for Croatian Power Plants

    International Nuclear Information System (INIS)

    Strijov, V.; Granic, G.; Juric, Z.; Jelavic, B.; Antesevic Maricic, S.

    2009-01-01

    The main goal of this paper is to present the methodology of construction of the Integral Indicator for Croatian Thermal Power Plants and Combined Heat and Power Plants. The Integral Indicator is necessary to compare Power Plants selected according to a certain criterion. The criterion of the Ecological Footprint is chosen. The following features of the Power Plants are used: generated electricity and heat; consumed coal and liquid fuel; sulphur content in fuel; emitted CO 2 , SO 2 , NO x and particles. To construct the Integral Indicator the linear model is used. The model parameters are tuned by the Principal Component Analysis algorithm. The constructed Integral Indicator is compared with several others, such as Pareto-Optimal Slicing Indicator and Metric Indicator. The Integral Indicator keeps as much information about features of the Power Plants as possible; it is simple and robust.(author).

  8. Sea water pumping-up power plant system combined with nuclear power plant

    International Nuclear Information System (INIS)

    Ichiki, Tadaharu; Tanaka, Masayuki.

    1991-01-01

    It is difficult to find a site suitable to construction for a sea water pumping-up power plant at a place relatively near the electric power consumption area. Then, a nuclear power plant is set at the sea bottom or the land portion of a sea shore near the power consumption area. A cavity is excavated underground or at the bottom of the sea in the vicinity of the power plant to form a lower pond, and the bottom of the sea, as an upper pond and the lower pond are connected by a water pressure pipe and a water discharge pipe. A pump water turbine is disposed therebetween, to which electric power generator is connected. In addition, an ordinary or emergency cooling facility in the nuclear power plant is constituted such that sea water in the cavity is supplied by a sea water pump. Accordingly, the sea water pumping-up plant system in combination with the nuclear power plant is constituted with no injuring from salts to animals and plants on land in the suburbs of a large city. The cost for facilities for supplying power from a remote power plant to large city areas and power loss are decreased and stable electric power can be supplied. (N.H.)

  9. Maine Yankee: Making the Transition from an Operating Plant to an Independent Spent Fuel Storage Installation (ISFSI)

    International Nuclear Information System (INIS)

    Norton, W.; McGough, M. S.

    2002-01-01

    The purpose of this paper is to describe the challenges faced by Maine Yankee Atomic Power Company in making the transition from an operating nuclear power plant to an Independent Spent Fuel Storage Installation (ISFSI). Maine Yankee (MY) is a 900-megawatt Combustion Engineering pressurized water reactor whose architect engineer was Stone and Webster. Maine Yankee was put into commercial operation on December 28, 1972. It is located on an 820-acre site, on the shores of the Back River in Wiscasset, Maine about 40 miles northeast of Portland, Maine. During its operating life, it generated about 1.2 billion kilowatts of power, providing 25% of Maine's electric power needs and serving additional customers in New England. Maine Yankee's lifetime capacity factor was about 67% and it employed more than 450 people. The decision was made to shutdown Maine Yankee in August of 1997, based on economic reasons. Once this decision was made planning began on how to accomplish safe and cost effective decommissioning of the plant by 2004 while being responsive to the community and employees

  10. ELECNUC Nuclear power plants in the world - 2013 edition

    International Nuclear Information System (INIS)

    2013-01-01

    This small booklet summarizes in a series of tables the figures relative to the nuclear power plants worldwide. Data come from the IAEA's PRIS database and from specific I-tese studies. The following aspects are reviewed: 2012 highlights; Main characteristics of reactor types; Map of the French nuclear power plants on 2012/01/01; Worldwide status of nuclear power plants (12/31/2012); Units distributed by countries; Nuclear power plants connected to the Grid- by reactor type groups; Nuclear power plants under construction on 2012; Evolution of nuclear power plants capacities connected to the grid; First electric generations supplied by a nuclear unit in each country; Electrical generation from nuclear power plants by country at the end 2012; Performance indicator of french PWR units; Evolution of the generation indicators worldwide by type; Nuclear operator ranking according to their installed capacity; Units connected to the grid by countries at 12/31/2012; Status of licence renewal applications in USA; Nuclear power plants under construction at 12/31/2012; Shutdown reactors; Exported nuclear capacity in net MWe; Exported and national nuclear capacity connected to the grid; Exported nuclear power plants under construction; Exported and national nuclear capacity under construction; Nuclear power plants ordered at 12/31/2012; Long term shutdown units at 12/31/2012; COL (Combined Licence) applications in the USA; Recycling of Plutonium in reactors and experiences; Mox licence plants projects; Appendix - historical development; Meaning of the used acronyms; Glossary

  11. Establishment of land model at the Shika Nuclear Power Plant. Mainly, on rock board classification

    International Nuclear Information System (INIS)

    Katagawa, Hideki; Hashimoto, Toru; Hirano, Shuji

    1999-01-01

    In order to grasp engineering properties of basic land of constructions, there is rock board classification as a method to classify whole of rock board to some groups considerable to be nearly equal on its properties. Among the method, various methods in response to its aim and characteristics are devised, and for a classification to hard rock board, the Denken type rock board classification considering degree of weathering to its main element and so forth are well known. The basic rock board of the Shika Nuclear Power Plant is composed of middle and hard types of rock, and its weathering is limited to its shallow portion, most of which are held at fresh condition. For such land, a new classification standard in response to characteristics of land was established. Here were introduced on a progress to establish a new classification standard, its application results and rock board properties. (G.K.)

  12. Thermonuclear power plants and the environment

    International Nuclear Information System (INIS)

    Becka, J.

    1978-01-01

    Environmental safety and protection from the effects of the thermonuclear power plants are discussed. Factors are assessed which should be considered in the choice of fuel and breeding material of a thermonuclear reactor, the problems of structural material activation and the overall reactor concepts. Main specifications are given of the US thermonuclear power plant projects with D-T reaction based reactors. The overall amounts of tritium in the reactor cycles are shown. The potential biological risk is evaluated for the different materials considered for the UWMAK-1 project. Discussed are possible pathways of activity release in normal plant operation, non-radioactive aspects, such as waste heat, the magnetic field effect on personnel and population, etc., as well as possible environmental impacts in case of accidents. (B.S.)

  13. Power conditioning devices in nuclear power plants

    International Nuclear Information System (INIS)

    Shida, Toichi.

    1979-01-01

    Purpose: To automatically prevent the liquid level from lowering in a reactor even if a feedwater adjusting valve is locked in a bwr type nuclear power plant. Constitution: Where a feedwater adjusting valve should be locked, and if the mismatching degree between the main steam flow rate and the feedwater flow rate exceeds a predetermined value and the mismatched state continues for a certain period, the value set to a main control for setting the recycling flow rate is changed corresponding to the mismatching degree to compensate the same thereby preventing the liquid level from lowering in the reactor. (Ikeda, J.)

  14. Training and qualification of nuclear power plant operators

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2008-01-01

    Based on training experiences of the nuclear power plant operators of pressurized water reactors (PWR) at the Nuclear Power Training Center Ltd. (NTC) in Japan, training programs were reviewed referring to US training programs. A systematic approach is deployed to them, which mainly consist of on-the-job training and the NTC training courses to meet the needs of all operators from beginners to experienced veterans according to their experiences and objectives. The NTC training is conducted using the simulators that simulate the nuclear power plant dynamics through the use of computers. The operators trained at the NTC work in the central control room of every PWR power plant. The NTC also carries out the qualification examinations for the shift managers. (T. Tanaka)

  15. Elecnuc - Nuclear power plants in the world - 2009 edition

    International Nuclear Information System (INIS)

    2009-01-01

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. These data come from the IAEA's PRIS and AREVA-CEA's GAIA databases. The following aspects are reviewed: 2008 highlights, Main characteristics of reactor types, Map of the French nuclear power plants on 2008/01/01, Worldwide status of nuclear power plants (12/31/2008), Units distributed by countries, Nuclear power plants connected to the Grid- by reactor type groups, Nuclear power plants under construction on 2008, Evolution of nuclear power plants capacities connected to the grid, First electric generations supplied by a nuclear unit in each country, Electrical generation from nuclear powe plants by country at the end 2008, Performance indicator of french PWR units, Evolution of the generation indicators worldwide by type, Nuclear operator ranking according to their installed capacity, Units connected to the grid by countries at 12/31/2008, Status of licence renewal applications in USA, Nuclear power plants under construction at 12/31/2008, Shutdown reactors, Exported nuclear capacity in net MWe, Exported and national nuclear capacity connected to the grid, Exported nuclear power plants under construction, Exported and national nuclear capacity under construction, Nuclear power plants ordered at 12/31/2008, Long term shutdown units at 12/31/2008, COL applications in the USA, Recycling of Plutonium in reactors and experiences, Mox licence plants projects, Appendix - historical development, Meaning of the used acronyms, Glossary

  16. Turbines for nuclear power plants. 2.ed.

    International Nuclear Information System (INIS)

    Troyanovskij, B.M.

    1978-01-01

    In the second edition of the book considered are practically all the main problems of calculation and operation of turbines and turbine installations of nuclear power plants. As compared to the first edition, essentially addes is the reproduction of the problem on combined generation of heat and electric energy. Also represented is detailed material on methods of preliminary evaluation of turbine effectiveness. Considered are peculiarities of turbine operation on wet steam and the basis of their thermal calculation. Much attention is payed to the problem of wet stream current in the turbine elements and wetness effect on their characteristics. Problems of wetness separation and moving blade erosion as well as other turbine elements are extracted in a special section. Given are structural schemes of different methods of innerchannel and periphery wet removal as well as experimental materials on their effectiveness. Given are descriptions and critical analysis of a great number of typical constructions of nuclear power plant steam turbines, produced by native plants as well as by the main foreign firms. Considered also are constructions of outside separators and steam superheaters. Separately given is the problem of rotation frequency choise of nuclear power plant wet steam turbines. Represented are materials on turbine installation tests, considered are the problems of turbine starting and manoeuvrability, analyzed are their typical jailures and damages. One of the sections of the book is devoted to gas turbine installations of nuclear power plants. Different material on this theme scattered before in various sources is summarized in the book

  17. Comparison between Different Power Sources for Emergency Power Supply at Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lenasson, Magnus

    2015-01-01

    report is financed by Elforsk - Swedish Electrical Utilities' R and D Company. The background of the report is that the Fukushima accident showed how redundant but not diversified power sources can be destroyed by external events. This might lead to increased focus on diversification, from the industry and/or the regulating authorities. A number of essential parameters for a power source to work as emergency power supply at a nuclear power plant have been identified; ten different power sources have then been evaluated with respect to these parameters. The report is supposed to work as a knowledge base and decision support when new nuclear power plants or reinvestments in old ones are considered. The studied power sources are: Diesel generators, Gas turbines, Internal steam turbines, Externals steam turbines, Hydro power plant, Batteries, Fuel cells, Stirling engines, Thermoelectric elements, Flywheels. The power sources are evaluated for five different applications, each application with its own acceptance criteria for each of the essential parameters. The five applications are: Onsite emergency AC source, Onsite emergency DC source, Alternate AC source, small, Alternate AC source, large, Alternate AC source, mobile. Mainly Swedish preconditions are considered in the report, but most of the results are applicable in any other country. (author)

  18. Actions concerning nuclear power plant life evaluation

    International Nuclear Information System (INIS)

    Chocron, M.; Fabbri, S.; Mizrahi, R.; Savino, E.J.; Versaci, R.A.

    1998-01-01

    One of the main activities to be undertaken by CNEA will be to provide technological assistance to NASA in problems concerning NPP operation. Works on life extensions of NPP are included in these activities. To fulfill these requirements the Atomic Energy National Commission (CNEA) has constituted a technical committee for Nuclear Power Plants Support (CAPCEN). CAPCEN should be the knowledge reservoir of those issues concerning the performance, safety and life extension of Nuclear Power Plants. One of CAPCEN's most important activities is to promote research work connected with such issues. The main technical areas are: Pressure Vessel and Piping, Heat Exchanges and Fuel Channels and Reactor Inner Components. Efforts are focused on the identification of the main components susceptible of ageing, the study of their ageing mechanisms, the follow-up of their behaviour during operation, and the measures taken to extend their life. (author)

  19. Auxiliary System Load Schemes in Large Thermal and Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kuzle, I.; Bosnjak, D.; Pandzic, H.

    2010-01-01

    Uninterrupted auxiliary system power supply in large power plants is a key factor for normal operation, transient states, start-ups and shutdowns and particularly during fault conditions. Therefore, there are many challenges in designing the main electrical system as well as the auxiliary systems power supply. Depending upon the type of fuel used and the environmental control system required, a thermal power plant may consume as much as 10% of its total generation for auxiliary power, while a nuclear power plant may require only 4 - 6% auxiliaries. In general, the larger the power generating plant, the higher the voltage selected for the AC auxiliary electric system. Most stations in the 75 to 500 MW range utilize 4,2 kV as the base auxiliary system voltage. Large generating stations 500 - 1000 MW and more use voltage levels of 6,9 kV and more. Some single dedicated loads such as electric driven boiler feed pumps are supplied ba a 13,8 kV bus. While designing the auxiliary electric system, the following areas must be considered: motor starting requirements, voltage regulation requirements, short-circuit duty requirements, economic considerations, reliability and alternate sources. Auxiliary power supply can't be completely generalized and each situation should be studied on its own merits to determine the optimal solution. Naturally, nuclear power plants have more reliability requirements and safety design criteria. Main coolant-pump power supply and continuity of service to other vital loads deserve special attention. This paper presents an overview of some up-to-date power plant auxiliary load system concepts. The main types of auxiliary loads are described and the electric diagrams of the modern auxiliary system supply concepts are given. Various alternative sources of auxiliary electrical supply are considered, the advantages and disadvantages of these are compared and proposals are made for high voltage distribution systems around the thermal and nuclear plant

  20. Bid Preparation and Evaluation for Nuclear Power Plant Project Management

    International Nuclear Information System (INIS)

    Mohd Idris Taib, Mohd Khairulezwan Abdul Manan and Nur Farizan Amadzun

    2011-01-01

    Bid preparation and evaluation is one of the main activities in Nuclear Power Plant Project management. International Atomic Energy Agency guide and Korean experience was studied for Malaysian requirement in realization of first Nuclear Power Plant. Several aspects shall be taken into consideration such as political scenario, financial capabilities, sitting, human resource, technologies, fuel supplies and decommissioning for long term exceeded hundred years. Bidding process and activities is proposed for our country requirement. The main activities included but unlimited to Bid Invitation Specification, Bid Evaluation Process, Technical Evaluation, Economic Bid Evaluation and Contracting. On the end of day, Malaysia need safe and reliable Nuclear Power Plant. Malaysian Economic Transformation Programme also get benefit from spin-off localization products and services as well as Technology Transfer Programme. (author)

  1. Steam turbines for nuclear power plants

    International Nuclear Information System (INIS)

    Kosyak, Yu.F.

    1978-01-01

    Considered are the peculiarities of the design and operation of steam turbines, condensers and supplementary equipment of steam turbines for nuclear power plants; described are the processes of steam flow in humid-steam turbines, calculation and selection principles of main parameters of heat lines. Designs of the turbines installed at the Charkov turbine plant are described in detail as well as of those developed by leading foreign turbobuilding firms

  2. Possibilities for retrofitting of the existing thermal electric power plants using solar power technologies

    International Nuclear Information System (INIS)

    Matjanov, Erkinjon K.; Abduganieva, Farogat A.; Aminov, Zarif Z.

    2012-01-01

    possibilities for retrofitting of the Tashkent thermal electric power plant on the basis of solar power technologies are being discussed with the German partners in the framework of the Joint-research project, funded by Volkswagenstiftung foundation (Germany) entitled 'Optimum feed-in of solar heat for conversion of low-efficient fossil-fired steam power plants to low-emission solar hybrid power plants by example of Uzbekistan'. The main data on the Tashkent thermal electric power plant: 12 steam turbines with total electric power output 1830 MW are installed. Main fuel - natural gas. Specific mass flow of the fuel - 394 gram/kWph. Electric efficiency of the power plant - 31,2 %. There is a reservoir for a masut (black oil) for 80 000 tons in the power plant, which consists of 7 masut tanks each of 10000 m 3 and 6 masut tanks each of 5000 m 3 . The following possibilities of retrofitting of the Tashkent thermal electric power plant with using solar technologies are being considered: 1. Installing a solar-fed steam generator instead of the existing steam generator. 2. Installing a solar-fed steam generator parallel to the existing steam generator. 3. Installing solar-heated feed water pre-heaters instead of the existing high-pressure and low-pressure feed water pre-heaters. 4. Installing solar-heated feed water pre-heaters parallel to the existing high-pressure and low-pressure feed water pre-heaters. The results of the researches are expected to improve electric efficiency of the Tashkent thermal electric power plant simultaneously reducing emissions into the environment. (authors)

  3. Monitoring and management of tritium from the nuclear power plant effluent

    Science.gov (United States)

    Zhang, Qiaoe; Liu, Ting; Yang, Lili; Meng, De; Song, Dahu

    2018-01-01

    It is important to regulate tritium nuclides from the nuclear power plant effluent, the paper briefly analyzes the main source of tritium, and the regulatory requirements associated with tritium in our country and the United States. The monitoring methods of tritium from the nuclear power plant effluent are described, and the purpose to give some advice to our national nuclear power plant about the effluent of tritium monitoring and management.

  4. Nuclear power plant decommissioning. The nature of problems

    Energy Technology Data Exchange (ETDEWEB)

    Yunus, Yaziz

    1986-04-01

    A number of issues have to be taken into account before the introduction of any nuclear power plant in any country. These issues include reactor safety (site and operational), waste disposal and, lastly, the decommissioning of the reactor inself. Because of the radioactive nature of the components, nuclear power plants require a different approach to decommission compared to other plants. Until recently, issues on reactor safety and waste disposal were the main topics discussed. As for reactor decommissioning, the debates have been academic until now. Although reactors have operated for 25 years, decommissioning of retired reactors has simply not been fully planned. But the Shippingport Atomic Power Plant in Pennysylvania, the first large-scale power reactor to be retired, is now being decommissioned. The work has rekindled the debate in the light of reality. Outside the United States, decommissioning is also being confronted on a new plane.

  5. Modernization and power uprate of the Laguna Verde Nuclear Power Plant (Mexico)

    International Nuclear Information System (INIS)

    Ruiz, L.; Merino, A.; Garcia-Serrano, J. L.

    2012-01-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Uprate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering, training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4,5 years (2007-2011), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. In this paper, the results obtained after all the modifications will be introduced. In addition, the most representative experience will be presented, as well as the lessons learned during the Project execution. (Author)

  6. Logic verification system for power plant sequence diagrams

    International Nuclear Information System (INIS)

    Fukuda, Mitsuko; Yamada, Naoyuki; Teshima, Toshiaki; Kan, Ken-ichi; Utsunomiya, Mitsugu.

    1994-01-01

    A logic verification system for sequence diagrams of power plants has been developed. The system's main function is to verify correctness of the logic realized by sequence diagrams for power plant control systems. The verification is based on a symbolic comparison of the logic of the sequence diagrams with the logic of the corresponding IBDs (interlock Block Diagrams) in combination with reference to design knowledge. The developed system points out the sub-circuit which is responsible for any existing mismatches between the IBD logic and the logic realized by the sequence diagrams. Applications to the verification of actual sequence diagrams of power plants confirmed that the developed system is practical and effective. (author)

  7. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  8. Evaluation of Visual and Landscape Impacts of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Algohary, S.A.

    2007-01-01

    The nuclear power plant is a huge structure, and in terms of both size and function may result in an unacceptable visual conflict in both local and wider environment. Also, it has major implications in terms of physical, social, economic, environmental and impact on people. The environmental impacts include the visual and landscape aspects of these plants. This paper outlines the main general ideas of the architecture aspects of nuclear power plants, nuclear reactors. Also, it discusses the site selection considerations: Finally, it introduces an approach for the evaluation of visual and landscape impacts of nuclear power plants

  9. Large-scale integration of wind power into power systems as well as on transmission networks for offshore wind power plants. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Betancourt, Uta; Ackermann, Thomas (eds.)

    2013-11-01

    This proceedings contains contributions to the followings main topics: Grid integration experiences; Flexibility and economics of integration; Voltage control issues; Offshore wind power plants; Forecasting; Grid code issues; HVDC connection issues; Frequency control issues; National grid's perspective; Power system balancing; Power system issues; New grid and generators issues; Flexibility with storage and demand side management; AC connected offshore wind power plants; Economic and market issues; Modelling issues; Offshore grid issues.

  10. Erosion and corrosion of nuclear power plant materials

    International Nuclear Information System (INIS)

    1994-01-01

    This conference is composed of 23 papers, grouped in 3 sessions which main themes are: analysis of corrosion and erosion damages of nuclear power plant equipment and influence of water chemistry, temperature, irradiations, metallurgical and electrochemical factors, flow assisted cracking, stress cracking; monitoring and control of erosion and corrosion in nuclear power plants; susceptibility of structural materials to erosion and corrosion and ways to improve the resistance of materials, steels, coatings, etc. to erosion, corrosion and cracking

  11. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  12. Radioactive waste treatment technology at Czech nuclear power plants

    International Nuclear Information System (INIS)

    Kulovany, J.

    2001-01-01

    This presentation describes the main technologies for the treatment and conditioning of radioactive wastes at Czech nuclear power plants. The main technologies are bituminisation for liquid radioactive wastes and supercompaction for solid radioactive wastes. (author)

  13. The problem of nuclear power plants site survey and selection

    International Nuclear Information System (INIS)

    Anh, T.H.; Hung, H.V.; Bui Quoc Thang

    1986-01-01

    The article presents the main steps of nuclear power plants siting, including the requirements from a nuclear power station onto the site, and the analysis of potential effects of a nuclear power station to the environment. Attentions are called upon the analysis of important factors such as electric transmission losses, cooling water supply, site accessibility, local infrastructure, risks due to man made and natural sources of aggression to the nuclear power plants, population, distribution, hydrological and atmospheric dispersion conditions

  14. Less power plants

    International Nuclear Information System (INIS)

    TASR

    2003-01-01

    In the Slovak Republic the number of company power plants decreased as against 2001 by two sources. In present time only 35 companies have their own power plants. The companies Slovnaft, Kappa Sturovo, Slovensky hodvab Senica, Matador Puchov, Maytex Liptovsky MikuIas, Kovohuty Krompachy, Chemko Strazske and some Slovak sugar factories belong to the largest company power plants in force of distributing companies. Installed output of present 35 company sources is 531 MW. The largest of separate power plants as Paroplynovy cyklus Bratislava (218 MW) and VD Zilina (72 MW) belong to independent sources. Total installed output of Slovak sources was 8306 MW in the end of last year

  15. Support of protective work of human error in a nuclear power plant

    International Nuclear Information System (INIS)

    Yoshizawa, Yuriko

    1999-01-01

    The nuclear power plant human factor group of the Tokyo Electric Power Co., Ltd. supports various protective work of human error conducted at the nuclear power plant. Its main researching theme are studies on human factor on operation of a nuclear power plant, and on recovery and common basic study on human factor. In addition, on a base of the obtained informations, assistance to protective work of human error conducted at the nuclear power plant as well as development for its actual use was also promoted. Especially, for actions sharing some dangerous informations, various assistances such as a proposal on actual example analytical method to effectively understand a dangerous information not facially but faithfully, construction of a data base to conveniently share such dangerous information, and practice on non-accident business survey for a hint of effective promotion of the protection work, were promoted. Here were introduced on assistance and investigation for effective sharing of the dangerous informations for various actions on protection of human error mainly conducted in nuclear power plant. (G.K.)

  16. Support services for new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, Alberto B.; Cazorla, Francisco

    2009-01-01

    TECNATOM is a spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. TECNATOM has worked in over 30 countries in activities related to the Operation and Maintenance of Nuclear Power Plants. It started to work in the design of new Nuclear Power Plants in the early 90s and since then has continued collaborating with different suppliers in the design and licensing of new reactors specially in the areas of plant systems design, Man-Machine Interface design, Main Control Room simulators building, training, qualification of equipment and PSI/ISI engineering services. (author)

  17. Modernization of the Electric Power Systems (transformers, rods and switches) in the Laguna Verde Nuclear Power Plant (Mexico)

    International Nuclear Information System (INIS)

    Gonzalez Solarzano, J. J.; Gabaldon Martin, M. A.; Pallisa Nunez, J.; Florez Ordeonez, A.; Fernandez Corbeira, A.; Prieto Diez, I.

    2010-01-01

    Description of the changes made in the Electric Power Systems as a part of the power increase project in the Laguna Verde Nuclear Power Plant (Mexico). The main electrical changes to make, besides the turbo group, are the main generation transformers, the isolated rods and the generation switch.

  18. Architecture and aesthetics of nuclear power plants

    International Nuclear Information System (INIS)

    Andreu, P.

    1977-01-01

    Having first analysed the main aesthetical and architectural problems related to the establishment of nuclear sites, the first results of the description is given of studies undertaken by a group of architects asked by E.D.F. to conceive the main buildings of a nuclear power plant and to imagine their insert in the site [fr

  19. Nuclear power plant outage optimisation strategy

    International Nuclear Information System (INIS)

    2002-10-01

    Competitive environment for electricity generation has significant implications for nuclear power plant operations, including among others the need of efficient use of resources, effective management of plant activities such as on-line maintenance and outages. Nuclear power plant outage management is a key factor for good, safe and economic nuclear power plant performance which involves many aspects: plant policy, co-ordination of available resources, nuclear safety, regulatory and technical requirements and, all activities and work hazards, before and during the outage. This technical publication aims to communicate these practices in a way they can be used by operators and utilities in the Member States of the IAEA. It intends to give guidance to outage managers, operating staff and to the local industry on planning aspects, as well as examples and strategies experienced from current plants in operation on the optimization of outage period. This report discusses the plant outage strategy and how this strategy is actually implemented. The main areas identified as most important for outage optimization by the utilities and government organizations participating in this report are: organization and management; outage planning and preparation, outage execution, safety outage review, and counter measures to avoid extension of outages and to easier the work in forced outages. This report was based on discussions and findings by the authors of the annexes and the participants of an Advisory Group Meeting on Determinant Causes for Reducing Outage Duration held in June 1999 in Vienna. The report presents the consensus of these experts regarding best common or individual good practices that can be used at nuclear power plants with the aim to optimize

  20. 20 years' operation of the Rheinsberg nuclear power plant

    International Nuclear Information System (INIS)

    Lehmann, R.; Quasniczka, H.; Fiss, W.; Hentschel, G.; Schulz, K.D.

    1986-01-01

    After a 20 years' operation of the Rheinsberg nuclear power plant a review of the operating results achieved, performance of the main equipment, research and development works performed, and experience gained with education and training of plant staff is given. (author)

  1. CEZ utility's coal-fired power plants: towards a higher environmental friendliness

    International Nuclear Information System (INIS)

    Kindl, V.; Spilkova, T.; Vanousek, I.; Stehlik, J.

    1996-01-01

    Environmental efforts of the major Czech utility, CEZ a.s., are aimed at reducing air pollution arising from electricity and heat generating facilities. There are 3 main kinds of activity in this respect: phasing out of coal fired power plants; technological provisions to reduce emissions of particulate matter, sulfur dioxide, and nitrogen oxides from those coal fired units that are to remain in operation after 1998; and completion of the Temelin nuclear power plant. In 1995, emissions of particulate matter, sulfur dioxide, nitrogen oxides, and carbon monoxide from CEZ's coal fired power plants were 19%, 79%, 59%, and 60%, respectively, with respect to the situation in 1992. The break-down of electricity generation by CEZ facilities (in GWh) was as follows in 1995: hydroelectric power plants 1673, nuclear power plants 12230, coal fired power plants without desulfurization equipment 30181, and coal fired power plants with desulfurization equipment 2277. Provisions implemented to improve the environmental friendliness of the individual CEZ's coal fired power plants are described in detail. (P.A.). 5 tabs., 1 fig

  2. POSSPOW: Possible Power of Offshore Wind Power Plants

    DEFF Research Database (Denmark)

    Giebel, Gregor; Göçmen, Tuhfe; Sørensen, Poul Ejnar

    2013-01-01

    Introduction In recent years, the very large offshore wind farms were designed as wind power plants, including possibilities to contribute to the stability of the grid by offering grid services (also called ancillary services). One of those services is reserve power, which is achieved by down......-regulating the wind farm from its maximum possible power. The power can be ramped up quite quickly, but the influence of wakes makes it difficult to assess the exact amount of down-regulation available to sell. Currently, Transmission System Operators (TSOs) have no real way to determine exactly the possible power...... will be verified on some of the large offshore wind farms owned by Vattenfall, and possibly in a DONG Energy wind farm too. Dedicated experiments to the wind flow in large offshore wind farms are planned. Main body of abstract Modern wind turbines have a SCADA signal called possible power. In normal operation...

  3. Improvements in the nuclear power plants - a permanent task for the plant management

    International Nuclear Information System (INIS)

    Langetepe, G.

    1991-01-01

    The main motives of the operators of nuclear power plants for carrying out backfitting measures are given by the following objectives: (1) to operate the nuclear power plants, older ones too, at a high level of safety, and to keep a lowest possible difference to the respective level of science and technology, (2) to ensure preconditions for a best possible economical operation, also with changing cost structures, (3) to create preconditions for the longest possible operational time. Operational times of more than 40 years have been throught to be realistic. A constant analysis of the operational safety of the whole plant is necessary for laying down the measures for backfitting of the plant. This analysis must also include the valuation of the nuclear safety in accordance with the progressive level of sience and technology. The proccess of backfitting in the German nuclear power plants will be illustrated with the help of several examples. (orig.) [de

  4. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  5. Nuclear power plants

    International Nuclear Information System (INIS)

    Margulova, T.Ch.

    1976-01-01

    The textbook focuses on the technology and the operating characteristics of nuclear power plants equiped with pressurized water or boiling water reactors, which are in operation all over the world at present. The following topics are dealt with in relation to the complete plant and to economics: distribution and consumption of electric and thermal energy, types and equipment of nuclear power plants, chemical processes and material balance, economical characteristics concerning heat and energy, regenerative preheating of feed water, degassing and condenser systems, water supply, evaporators, district heating systems, steam generating systems and turbines, coolant loops and pipes, plant siting, ventilation and decontamination systems, reactor operation and management, heat transfer including its calculation, design of reactor buildings, and nuclear power plants with gas or sodium cooled reactors. Numerous technical data of modern Soviet nuclear power plants are included. The book is of interest to graduate and post-graduate students in the field of nuclear engineering as well as to nuclear engineers

  6. A study on economic power dispatch grid connected PV power plant in educational institutes

    Science.gov (United States)

    Singh, Kuldip; Kumar, M. Narendra; Mishra, Satyasis

    2018-04-01

    India has main concerns on environment and escalation of fuel prices with respect to diminution of fossil fuel reserves and the major focus on renewable Energy sources for power generation to fulfill the present and future energy demand. Installation of PV power plants in the Educational Institutions has grown up drastically throughout India. More PV power plant are integrated with load and grid through net metering. Therefore, this paper is an analysis of the 75kWp PV plant at chosen buses, considering the need of minimum demand from the grid. The case study is carried out for different generation level throughout the day and year w.r.t load and climate changes, load sharing on grid. The economic dispatch model developed for PV plant integrated with Grid.

  7. Technical evaluation of the electrical, instrumentation, and control design aspects of the low temperature overpressure protection system for the Maine Yankee nuclear power plant

    International Nuclear Information System (INIS)

    Latorre, V.R.; Mayn, B.G.

    1979-08-01

    This report documents the technical evaluation of the electrical, instrumentation, and control design aspects for the low temperature overpressure protection system of the Maine Yankee nuclear power plant. Design basis criteria used to evaluate the acceptability of the system included operator action, system testability, single failure criterion, and seismic Category I and IEEE Std-279-1971 criteria

  8. Accident prevention in power plants

    International Nuclear Information System (INIS)

    Steyrer, H.

    Large thermal power plants are insured to a great extent at the Industrial Injuries Insurance Institute of Instrument and Electric Engineering. Approximately 4800 employees are registered. The accident frequency according to an evaluation over 12 months lies around 79.8 per year and 1000 employees in fossil-fired power plants, around 34.1 per year and 1000 employees in nuclear power plants, as in nuclear power plants coal handling and ash removal are excluded. Injuries due to radiation were not registered. The crucial points of accidents are mechanical injuries received on solid, sharp-edged and pointed objects (fossil-fired power plants 28.6%, nuclear power plants 41.5%), stumbling, twisting or slipping (fossil-fired power plants 21.8%, nuclear power plants 19.5%) and injuries due to moving machine parts (only nuclear power plants 12.2%). However, accidents due to burns or scalds obtain with 4.2% and less a lower portion than expected. The accident statistics can explain this fact in a way that the typical power plant accident does not exist. (orig./GL) [de

  9. Integration of a nuclear power plant in electrical systems, alternative programs, optimization

    International Nuclear Information System (INIS)

    Souza, J.A.M. de.

    1991-01-01

    The problem of integration of a nuclear power plants in a electrical power system, to support the power demand of the system, and mainly also support the power demand at the critical period, I.E., peak demands, is analysed. The factors considered in this analysis are: the demand structure of the region, the availability of others power plants in the electrical net and the capacity factor. (author)

  10. Safety assessment of emergency electric power systems for nuclear power plants

    International Nuclear Information System (INIS)

    1986-09-01

    This paper is intended to assist the safety assessor within a regulatory body, or one working as a consultant, in assessing a given design of the Emergency Electrical Power System. Those non-electric power systems which may be used in a plant design to serve as emergency energy sources are addressed only in their general safety aspects. The paper thus relates closely to Safety Series 50-SG-D7 ''Emergency Power Systems at Nuclear Power Plants'' (1982), as far as it addresses emergency electric power systems. Several aspects are dealt with: the information the assessor may expect from the applicant to fulfill his task of safety review; the main questions the reviewer has to answer in order to determine the compliance with requirements of the NUSS documents; the national or international standards which give further guidance on a certain system or piece of equipment; comments and suggestions which may help to judge a variety of possible solutions

  11. Development of automatic inspection robot for nuclear power plants

    International Nuclear Information System (INIS)

    Yamada, K.; Suzuki, K.; Saitoh, K.; Sakaki, T.; Ohe, Y.; Mizutani, T.; Segawa, M.; Kubo, K.

    1987-01-01

    This robot system has been developed for automatic inspection of nuclear power plants. The system configuration is composed of vehicle that runs on monorail, the sensors on the vehicle, an image processer that processes the image information from the sensors, a computer that creates the inspection planning of the robot and an operation panel. This system has two main features, the first is the robot control system. The vehicle and the sensors are controlled by the output data calculated in the computer with the three dimensional plant data. The malfunction is recognized by the combination of the results of image processing, information from the microphone and infrared camera. Tests for a prototype automatic inspection robot system have been performed in the simulated main steam piping room of a nuclear power plant

  12. Geodesy problems in nuclear power plant construction

    International Nuclear Information System (INIS)

    Eory, K.

    1981-01-01

    The special geodetic problems encountered during the construction of the Paks nuclear power plants are treated. The main building with its hermetically connected components including the reactor, the steam generators, the circulation pumps etc. impose special requirements on the control net of datum points. The geodesy tasks solved during the construction of the main building are presented in details. (R.P.)

  13. Garigliano nuclear power plant

    International Nuclear Information System (INIS)

    1976-03-01

    During the period under review, the Garigliano power station produced 1,028,77 million kWh with a utilization factor of 73,41% and an availability factor of 85,64%. The disparity between the utilization and availability factors was mainly due to a shutdown of about one and half months owing to lack of staff at the plant. The reasons for nonavailability (14.36%) break down as follows: nuclear reasons 11,49%; conventional reasons 2,81%; other reasons 0,06%. During the period under review, no fuel replacements took place. The plant functioned throughout with a single reactor reticulation pump and resulting maximum available capacity of 150 MWe gross. After the month of August, the plant was operated at levels slightly below the maximum available capacity in order to lengthen the fuel cycle. The total number of outages during the period under review was 11. Since the plant was brought into commercial operation, it has produced 9.226 million kWh

  14. Efficiency improvement of thermal coal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hourfar, D. [VEBA Kraftwerke Ruhr Ag, Gelsenkirchen (Germany)

    1996-12-31

    The discussion concerning an increase of the natural greenhouse effect by anthropogenic changes in the composition of the atmosphere has increased over the past years. The greenhouse effect has become an issue of worldwide debate. Carbon dioxide is the most serious emission of the greenhouse gases. Fossil-fired power plants have in the recent past been responsible for almost 30 % of the total CO{sub 2} emissions in Germany. Against this background the paper will describe the present development of CO{sub 2} emissions from power stations and present actual and future opportunities for CO{sub 2} reduction. The significance attached to hard coal as one of today`s prime sources of energy with the largest reserves worldwide, and, consequently, its importance for use in power generation, is certain to increase in the years to come. The further development of conventional power plant technology, therefore, is vital, and must be carried out on the basis of proven operational experience. The main incentive behind the development work completed so far has been, and continues to be, the achievement of cost reductions and environmental benefits in the generation of electricity by increasing plant efficiency, and this means that, in both the short and the long term, power plants with improved conventional technology will be used for environmentally acceptable coal-fired power generation.

  15. Data list of nuclear power plants in Japan

    International Nuclear Information System (INIS)

    Izumi, Fumio; Ito, Noboru; Higuchi, Suminori; Kobayashi, Kensuke; Tobioka, Toshiaki

    1987-03-01

    The PPD (Nuclear Power Plant Data Base) has been under development in JAERI since 1983 as a six-year program to provide useful information for reactor safety regulation and reactor safety research. Information source of the PPD is mainly based on SAR's (Safety Analysis Reports) of 35 nuclear power plants which are operating, under construction or under licensing review in Japan. The report BWR edition consists of several data lists stored in the PPD, concerning safety design such as performances, equipments and installations of 18 BWR plants in Japan. The informations are based on SAR Attachment Chapter 8 ''Nuclear Reactor Facility Safety Design''. (author)

  16. Nuclear power plant personnel training process management system

    International Nuclear Information System (INIS)

    Arjona Vazquez, Orison; Venegas Bernal, Maria del Carmen; Armeteros Lopez, Ana L.

    1996-01-01

    The system in charge the management of the training process personnel from a nuclear power plant was designed taking into account all the requirements stated in the training guide for nuclear power plant personnel and their evaluation, which were prepared by the IAEA in 1995 in order to implement the SAT in the training programs for nuclear plant personnel. In the preparations of formats and elements that shape the system, account has been taken of the views expressed in such a guide, in some other bibliography that was consulted, and in the authors own opinion mainly with regard to those issues which the guide does not go deeper into

  17. First Aspect of Conventional Power System Assessment for High Wind Power Plants Penetration

    Directory of Open Access Journals (Sweden)

    A Merzic

    2012-11-01

    Full Text Available Most power systems in underdeveloped and developing countries are based on conventional power plants, mainly "slow-response" thermal power plants and a certain number of hydro power plants; characterized by inflexible generating portfolios and traditionally designed to meet own electricity needs. Taking into account operational capabilities of conventional power systems, their development planning will face problems with integration of notable amounts of installed capacities in wind power plants (WPP. This is what highlights the purpose of this work and in that sense, here, possible variations of simulated output power from WPP in the 10 minute and hourly time interval, which need to be balanced, are investigated, presented and discussed. Comparative calculations for the amount of installed power in WPP that can be integrated into a certain power system, according to available secondary balancing power amounts, in case of concentrated and dispersed future WPP are given. The stated has been done using a part of the power system of Bosnia and Herzegovina. In the considered example, by planned geographically distributed WPP construction, even up to cca. 74% more in installed power of WPP can be integrated into the power system than in case of geographically concentrated WPP construction, for the same available amount of (secondary balancing power. These calculations have shown a significant benefit of planned, geographically distributed WPP construction, as an important recommendation for the development planning of conventional power systems, with limited balancing options. Keywords: balancing reserves,  geographical dispersion, output power  variations

  18. IAEA technical meeting on integrating analog and digital instrumentation and control systems in hybrid main control rooms at nuclear power plants. Book of abstracts

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    that digital technology offers are needed to increase cost-effective electricity production. As an integral part of the I and C modernization program at a nuclear power plant, the control room and other human-system interfaces (HSIs) will also be modernized. To support safe and effective operation, it is critical to specify, design, implement, operate, and maintain, as well as train for, the control room and HSI changes to take advantage of human cognitive processing abilities. This consideration of human factors is essential to increase performance and to reduce the likelihood of human errors. The plant I and C and HSI modifications can affect personnel in various ways. They can impact the role of personnel, the tasks to be performed, the way tasks are performed, and the knowledge, skills and training required of personnel. As part of modernization, HSIs are becoming more computer-based, incorporating features such as soft controls and computerized procedures, touch-screen interfaces, sit-down workstations, and large-screen overview displays. As computer-based technologies are integrated into control rooms that were largely based on conventional technology, hybrid control rooms are created. The potential benefits of implementing digital technology include more efficient operations and maintenance, leading to improved power plant availability and safety through the avoidance of transients, forced outages, and unnecessary shutdowns. The potential benefits also include increased efficiency and power output as well as reduced operating costs. New digital systems provide the opportunity to give personnel information they did not have with conventional systems. The importance of these issues has led the IAEA to organize (in conjunction with AECL) an international forum for presentations and discussions on the potential benefits and challenges related to the integration of Analog and Digital Instrumentation and Control Systems in Hybrid Main Control Rooms. Many of these

  19. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  20. Calculation of Efficiencies of a Ship Power Plant Operating with Waste Heat Recovery through Combined Heat and Power Production

    Directory of Open Access Journals (Sweden)

    Mirko Grljušić

    2015-05-01

    Full Text Available The aim of this research was to investigate the possibility of a combined heat & power (CHP plant, using the waste heat from a Suezmax-size oil tanker’s main engine, to meet all heating and electricity requirements during navigation. After considering various configurations, a standard propulsion engine operating at maximum efficiency, combined with a supercritical Organic Rankine cycle (ORC system, was selected to supply the auxiliary power, using R245fa or R123 as the working fluid. The system analysis showed that such a plant can meet all heat and electrical power requirements at full load, with the need to burn only a small amount of supplementary fuel in a heat recovery steam generator (HRSG when the main engine operates at part load. Therefore, it is possible to increase the overall thermal efficiency of the ship’s power plant by more than 5% when the main engine operates at 65% or more of its specified maximum continuous rating (SMCR.

  1. Operator training simulator for BWR nuclear power plant

    International Nuclear Information System (INIS)

    Watanabe, Tadasu

    1988-01-01

    For the operation management of nuclear power stations with high reliability and safety, the role played by operators is very important. The effort of improving the man-machine interface in the central control rooms of nuclear power stations is energetically advanced, but the importance of the role of operators does not change. For the training of the operators of nuclear power stations, simulators have been used from the early stage. As the simulator facilities for operator training, there are the full scope simulator simulating faithfully the central control room of an actual plant and the small simulator mainly aiming at learning the plant functions. For BWR nuclear power stations, two full scope simulators are installed in the BWR Operator Training Center, and the training has been carried out since 1974. The plant function learning simulators have been installed in respective electric power companies as the education and training facilities in the companies. The role of simulators in operator training, the BTC No.1 simulator of a BWR-4 of 780 MWe and the BTC No.2 simulator of a BWR-5 of 1,100 MWe, plant function learning simulators, and the design of the BTC No.2 simulator and plant function learning simulators are reported. (K.I.)

  2. Remote-automated inspection and maintenance of nuclear power plant equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, Masayoshi; Nakano, Yoshiyuki

    1984-12-01

    Employing remote-control inspection and maintenance equipment in nuclear power plants increases the plant availability by decreasing the annual shutdown time (outage), as well as radiation exposure and man-power. This paper presents an outline of the latest designs for an automatic refueling machine, a control rod drive handling machine, a fuel preparation machine, and a main steam line plug, which were supplied to the Fukushima Dai-Ni No. 2 Plant of the Tokyo Electric Power Co., Inc. (Fukushima 2-2). Also, the up-to-date developments of other new automatic machines, such as a CRD disassembly and cleaning system, spent fuel channel box volume reduction equipment, and robotics for nuclear plant use are presented.

  3. Safety in nuclear power plant siting. A code of practice

    International Nuclear Information System (INIS)

    1978-01-01

    This publication is brought out within the framework of establishing Codes of Practice and Safety Guides for nuclear power plants: NUSS programme. The scope of the document encompasses site and site-plant interaction factors related to operational states and accident conditions. The purpose of the Code is to give criteria and procedures to be applied as appropriate to operational states and accident conditions, including those which could lead to emergency situations. This Code is mainly concerned with severe events of low probability which relate to the siting of nuclear power plants and have to be considered in designing a particular nuclear power plant. Annex: Examples of natural and man-made events relevant for design basis evaluation

  4. Participation of the national industry within a nuclear power plant program by technology transfer from the point of view of the main contractor

    International Nuclear Information System (INIS)

    Kopp, H.

    1986-04-01

    The broad scope of components needed in a nuclear power plant with various technical requirements offer a big opportunity for the participation of local industries in the construction of such plants. Depending on the existing capability of the industrial enterprises, the scope of national participation can be increased by technology transfer on all technical areas to be applied for the construction of NPPs. Such technology requires as basis a nuclear program of the country determined and supported by the government and the utilities. This program has to be defined as realistic as even possible adjoined to the future energy demand of the country. Furthermore the available capability, existing qualifications and equipment of the national industry have to be considered. On the basis of these fundamental requirements a tailormade technology transfer program has to be elaborated in close cooperation with an experienced main contractor of the plant and his partners for such technology transfer and should be established afterwards. This program has to consider not only the goal to achieve finally the independent production of components and equipment for NPPs or the construction of complete power plant units itself, but also the economic benefit of such a program for the country. The costs of technology transfer and the necessary investment of the national industry required for the manufacture of nuclear components have to be thoroughly investigated, based on the expected scope of products to be manufactured for the nuclear power plants according to the nuclear program. Furthermore the application of the technology transferred for other components e.g. for conventional power stations, mineral-oil or chemical industrial plants has to be considered. By a tailormade nuclear technology transfer program, executed by qualified and experienced partners not only the quality of the products of the national industry for NPPs will be improved, but also the general standard regarding

  5. Water management of the Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Rabusic, P.

    1990-01-01

    Industrial water for the Dukovany nuclear power plant is taken from a reservoir built on the Jihlava river. The volume of the reservoir is 17.1 million m 3 . The water taken serves mainly as the make-up water for the cooling circuit and is treated by clearing; it is also used for the preparation of demineralized water for making up the condensate circuit and for the preparation of soft water for making up the heat piping. The consumption of industrial water is 1 to 2 m 3 /s. Waste waters are released into rainwater drainage, sewage drainage and industrial water drainage. Waste waters are segregated according to the place of their origin and are purified, mainly on ion exchangers and on an evaporator. In normal conditions, they are returned to the operation. Concentrated liquid residues and solid wastes will be stored by using the multiple containment system. The most important radioisotopes that may be present in nuclear power plant waste waters, the water and radionuclide balance of the Dukovany nuclear power plant, and chemical and radiological data on the Dukovany waste waters (1989) are tabulated. (P.A.). 6 refs

  6. Lifetime management research trend of Kori-1 nuclear power plant

    International Nuclear Information System (INIS)

    Kim, J. S.; Jeong, I. S.; Hong, S. Y.

    1998-01-01

    KEPRI launched the Nuclear Power Plant Lifetime Management Study(II) for the management of the latter half life of Kori-1. Main goal of LCM-IV study is the detail evaluation of main equipment life and establishment of aging management based on LCM-IV result. The result of LCM-IV on the kori-1 confirmed the technical and economical feasibility of life extension beyond the design life. Owing to absence of The regulatory policy for the life extension in korea, LCM-IV will focus on the minimum study which is essential for the actual lifetime management for the old nuclear power plant. License renewal study is expected after the establishment of Regulatory policy about the life extension of nuclear power plant. LCM trend in korea and abroad, result of technical and economical feasibility study and summary of LCM-IV is described on this paper

  7. Video camera use at nuclear power plants

    International Nuclear Information System (INIS)

    Estabrook, M.L.; Langan, M.O.; Owen, D.E.

    1990-08-01

    A survey of US nuclear power plants was conducted to evaluate video camera use in plant operations, and determine equipment used and the benefits realized. Basic closed circuit television camera (CCTV) systems are described and video camera operation principles are reviewed. Plant approaches for implementing video camera use are discussed, as are equipment selection issues such as setting task objectives, radiation effects on cameras, and the use of disposal cameras. Specific plant applications are presented and the video equipment used is described. The benefits of video camera use --- mainly reduced radiation exposure and increased productivity --- are discussed and quantified. 15 refs., 6 figs

  8. Preliminary project concerning the straw-based combined power-heat plant at Glamsbjerg

    International Nuclear Information System (INIS)

    Gabriel, S.; Koch, T.

    1994-01-01

    The supplement to the main report on the planned dual-purpose power plant at Glamsbjerg contains documentation of the straw gasification and pyrolysis process, a detailed description of the power plant components, and the procedures of operation and maintenance of the combined systems. (EG)

  9. Development of a web-based monitoring system using operation parameters for the main component in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Son, Dong Chan; An Kang Il; Hong, Suk Young; Lee, Jeong Soo; Lee, Kwang Yeol; Shin, Sun Hee; Lee, Chun Wha; Son, So Hee [Daesang Information Technology Co., Ltd., Seoul (Korea, Republic of)

    2003-03-15

    The frequency of the damage is increasing, which is caused by the fatigue, according to the increase of running of nuclear power plants. So we need to acquire the reliance of design data to estimate the fatigue and damage of major machinery that might happen as time-dependent crack growth characterization. The research is focused on keeping operating record of nuclear power plants about major machinery which consists of a nuclear reactor pressure boarder on each excessive operating condition including normal operating and extraordinary operating by estimating fracture mechanical movements on real time and fatigue about major nuclear power plants machinery, which are acquired the pressure and temperature data. For further details about the scope and contents of R and D are following: development of H/W that is necessary to acquire operating real time data of heating and hydraulic power, selection of a safety variable about major system by each type (the fourth unit), communication protocol development for connecting between CARE system data base server and fatigue monitoring system data base server, development of connecting database for controlling and storing of heating and hydraulic power operating data, real time monitoring system development based on web using JAVA.

  10. Models of cognitive behavior in nuclear power plant personnel. A feasibility study: main report. Volume 2

    International Nuclear Information System (INIS)

    Woods, D.D.; Roth, E.M.; Hanes, L.F.

    1986-07-01

    This report contains the results of a feasibility study to determine if the current state of models human cognitive activities can serve as the basis for improved techniques for predicting human error in nuclear power plants emergency operations. Based on the answer to this questions, two subsequent phases of research are planned. Phase II is to develop a model of cognitive activities, and Phase III is to test the model. The feasibility study included an analysis of the cognitive activities that occur in emergency operations and an assessment of the modeling concepts/tools available to capture these cognitive activities. The results indicated that a symbolic processing (or artificial intelligence) model of cognitive activities in nuclear power plants is both desirable and feasible. This cognitive model can be built upon the computational framework provided by an existing artificial intelligence system for medical problem solving called Caduceus. The resulting cognitive model will increase the capability to capture the human contribution to risk in probabilistic risk assessments studies. Volume I summarizes the major findings and conclusions of the study. Volume II provides a complete description of the methods and results, including a synthesis of the cognitive activities that occur during emergency operations, and a literature review on cognitive modeling relevant to nuclear power plants. 112 refs., 10 figs

  11. Recent advances in nuclear power plant simulation

    International Nuclear Information System (INIS)

    Zerbino, H.; Plisson, P.; Friant, J.Y.

    1997-01-01

    The field of industrial simulation has experienced very significant progress in recent years, and power plant simulation in particular has been an extremely active area. Improvements may be recorded in practically all simulator subsystems. In Europe, the construction of new full- or optimized-scope nuclear power plant simulators during the middle 1990's has been remarkable intense. In fact, it is possible to identify a distinct simulator generation, which constitutes a new de facto simulation standard. Thomson Training and Simulation has taken part in these developments by designing, building, and validation several of these new simulators for Dutch, German and French nuclear power plants. Their characteristics are discussed in this paper. The following main trends may be identified: Process modeling is clearly evolving towards obtaining engineering-grade performance, even under the added constraints of real-time operation and a very wide range of operating conditions to be covered; Massive use of modern graphic user interfaces (GUI) ensures an unprecedented flexibility and user-friendliness for the Instructor Station; The massive use of GUIs also allows the development of Trainee Stations (TS), which significantly enhance the in-depth training value of the simulators; The development of powerful Software Development Environments (SDE) enables the simulator maintenance teams to keep abreast of modifications carried out in the reference plants; Finally, simulator maintenance and its compliance with simulator fidelity requirements are greatly enhanced by integrated Configuration Management Systems (CMS). In conclusion, the power plant simulation field has attained a strong level of maturity, which benefits its approximately forty years of service to the power generation industry. (author)

  12. Off-shore nuclear power plant

    International Nuclear Information System (INIS)

    Nakanishi, T.

    1980-01-01

    In order to avoid losses of energy and seawater pollution an off-shore nuclear power plant is coupled with a power plant which utilizes the temperature difference between seawater and hot reactor cooling water. According to the invention the power plant has a working media loop which is separated from the nuclear power plant. The apparative equipment and the operational characteristics of the power plant are the subject of the patent. (UWI) [de

  13. Availability of thermal power plants

    International Nuclear Information System (INIS)

    Nitsch, D.; Schmitz, H.

    1981-01-01

    Availability data based on unique uniform, and clearly defined concepts and methods of acquisition have been compiled by the VGB since 1970. The data are published in anual reports. These reports contain availability data of fossil-fuelled units, combined gas/steam units, nuclear power plants, and gas turbine plants in Germany and abroad, listed by unit size fuel type, time of operation, and application. For the purpose of comparison, the data for the years since 1970 are presented as well as data averaged for the whole period under report. The main results for the year 1980 are presented now that the greater part of the plants has been evaluated. The complete evaluation will be published towards the end of 1981. (orig.) [de

  14. Solar thermal power plants

    International Nuclear Information System (INIS)

    Schnatbaum, L.

    2009-01-01

    The solar thermal power plant technology, the opportunities it presents and the developments in the market are outlined. The focus is on the technology of parabolic trough power plants, a proven technology for solar power generation on a large scale. In a parabolic trough power plant, trough-shaped mirrors concentrate the solar irradiation onto a pipe in the focal line of the collector. The thermal energy thus generated is used for electricity generation in a steam turbine. Parabolic trough plants can be combined with thermal storage and fossil or biomass fired heat exchangers to generate electricity even when the sun is not shining. Solar Millennium AG in Erlangen has developed the first power plant of this kind in Europe. After two years of construction the plant started operation in Southern Spain in 2008. This one and its sister projects are important steps leading the way for the whole market. The paper also covers the technological challenges, the key components used and the research and development activities concerning this technology. Solar thermal power plants are ideal for covering peak and medium loads in power grids. In hybrid operation they can also cover base-load. The Solar Chimney power plant, another striking technology for the conversion of solar into electric energy, is described briefly. The paper concludes with a look at the future - the import of solar energy from the deserts of North Africa to central Europe. (author)

  15. Power plant cycle chemistry - a currently neglected power plant chemistry discipline

    International Nuclear Information System (INIS)

    Bursik, A.

    2005-01-01

    Power plant cycle chemistry seems to be a stepchild at both utilities and universities and research organizations. It is felt that other power plant chemistry disciplines are more important. The last International Power Cycle Chemistry Conference in Prague may be cited as an example. A critical review of the papers presented at this conference seems to confirm the above-mentioned statements. This situation is very unsatisfactory and has led to an increasing number of component failures and instances of damage to major cycle components. Optimization of cycle chemistry in fossil power plants undoubtedly results in clear benefits and savings with respect to operating costs. It should be kept in mind that many seemingly important chemistry-related issues lose their importance during forced outages of units practicing faulty plant cycle chemistry. (orig.)

  16. Ageing management of nuclear power plant - the Tarapur experience

    International Nuclear Information System (INIS)

    Anilkumar, K.R.; Das, P.K.; Bhattacharjee, S.; Ramamurty, U.

    2006-01-01

    Tarapur Atomic Power Station, the longest serving Nuclear Power Plant in the Asian continent has completed 36 years of successful operation and generated more than 70,000 million units of electric power. Built in late sixties, with the state-of-the-art safety features prevailing then, TAPS through the process of evolution has become safer plant due to efforts of upgradation, renovation and refurbishment prompted by the station's operating experience, feed back from overseas reactors, lessons learnt from nuclear incidents, accidents and fresh review of design basis and safety analysis of the plant. All components of a Nuclear power plant experience some degradation with time. The Reactor Pressure Vessels (RPV) designed for 40 effective full power years (EFPY) of operation have operated for less than 20 EFPY and the material condition is assessed to be fit for some more years of service. The condition of the containment and main plant buildings was assessed to be satisfactory. The Ageing Management Programme (AMP) involved identification of key systems, structures and components (SSCs) that may experience degradation due to ageing, and take corrective measures through maintenance, repair and/or replacement. The identified components were classified as major critical components, important systems and other critical components. For each component mode of degradation was identified, ageing assessment was done and action plan was finalized. Replacement of some important equipment like 3 x 50 % capacity Emergency Diesel Generators (EDG) with 3 x 100 % capacity EDG, Salt Service Water (SSW) pumps, Control rod drive (CRD) pumps, Emergency Condenser tube bundles, Station battery has been done on the basis of condition monitoring and to obviate common cause failure and enhance the system reliability. Samples of Safety related cables were subjected to residual life assessment (RLA) and replacement action firmed up on the basis of the RLA findings. Condition survey of Main

  17. Nuclear Power Plant Outage Optimization Strategy. 2016 Edition

    International Nuclear Information System (INIS)

    2016-10-01

    This publication is an update of IAEA-TECDOC-1315, Nuclear Power Plant Outage Optimisation Strategy, which was published in 2002, and aims to communicate good outage management practices in a manner that can be used by operators and utilities in Member States. Nuclear power plant outage management is a key factor for safe and economic nuclear power plant performance. This publication discusses plant outage strategy and how this strategy is actually implemented. The main areas that are important for outage optimization that were identified by the utilities and government organizations participating in this report are: 1) organization and management; 2) outage planning and preparation; 3) outage execution; 4) safety outage review; and 5) counter measures to avoid the extension of outages and to facilitate the work in forced outages. Good outage management practices cover many different areas of work and this publication aims to communicate these good practices in a way that they can be used effectively by operators and utilities

  18. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  19. Seismic margin review of the Maine Yankee Atomic Power Station: Fragility analysis

    International Nuclear Information System (INIS)

    Ravindra, M.K.; Hardy, G.S.; Hashimoto, P.S.; Griffin, M.J.

    1987-03-01

    This Fragility Analysis is the third of three volumes for the Seismic Margin Review of the Maine Yankee Atomic Power Station. Volume 1 is the Summary Report of the first trial seismic margin review. Volume 2, Systems Analysis, documents the results of the systems screening for the review. The three volumes are part of the Seismic Margins Program initiated in 1984 by the Nuclear Regulatory Commission (NRC) to quantify seismic margins at nuclear power plants. The overall objectives of the trial review are to assess the seismic margins of a particular pressurized water reactor, and to test the adequacy of this review approach, quantification techniques, and guidelines for performing the review. Results from the trial review will be used to revise the seismic margin methodology and guidelines so that the NRC and industry can readily apply them to assess the inherent quantitative seismic capacity of nuclear power plants

  20. Seismic margin review of the Maine Yankee Atomic Power Station: Fragility analysis

    Energy Technology Data Exchange (ETDEWEB)

    Ravindra, M. K.; Hardy, G. S.; Hashimoto, P. S.; Griffin, M. J.

    1987-03-01

    This Fragility Analysis is the third of three volumes for the Seismic Margin Review of the Maine Yankee Atomic Power Station. Volume 1 is the Summary Report of the first trial seismic margin review. Volume 2, Systems Analysis, documents the results of the systems screening for the review. The three volumes are part of the Seismic Margins Program initiated in 1984 by the Nuclear Regulatory Commission (NRC) to quantify seismic margins at nuclear power plants. The overall objectives of the trial review are to assess the seismic margins of a particular pressurized water reactor, and to test the adequacy of this review approach, quantification techniques, and guidelines for performing the review. Results from the trial review will be used to revise the seismic margin methodology and guidelines so that the NRC and industry can readily apply them to assess the inherent quantitative seismic capacity of nuclear power plants.

  1. Selection of Possible Candidate Area for Nuclear Power Plant in Johor, Malaysia

    International Nuclear Information System (INIS)

    Nor Afifah Basri; Ahmad Termizi Ramli

    2012-01-01

    Nuclear power is considered as one of the best option for future energy development in Malaysia. Since Malaysia has no experience in nuclear energy generation, commissioning the first nuclear power plant needs tremendous effort in various aspects. Site selection is one of important step in nuclear power plant commissioning process. This paper proposes candidate sites for nuclear power plant in Mersing, Kota Tinggi, Muar and Batu Pahat district in Johor, Malaysia. The candidate selection process uses the IAEA document and AELB guideline as main reference, supported by site selection procedure by various countries. MapInfo Professional software was used to simulate the selection process for candidate areas for the nuclear power plant. This paper concluded that Tenggaroh and Jemaluang area are the most suitable area for nuclear power plant facilities in Johor, Malaysia. (Author)

  2. Shaking table test of a base isolated model in main control room of nuclear power plant using LRB (lead rubber bearing)

    International Nuclear Information System (INIS)

    Ham, K. W.; Lee, K. J.; Suh, Y. P.

    2005-01-01

    LRB(Lead Rubber Bearing) is a widely used isolation system which is installed between equipment and foundation to reduce seismic vibration from ground. LRB is consist of bearings which are resistant to lateral motion and torsion and has a high vertical stiffness. For that reason, several studies are conducted to apply LRB to the nuclear power plant. In this study, we designed two types of main control floor systems (type I, type II) and a number of shaking table tests with and without isolation system were conducted to evaluate floor isolation effectiveness of LRB

  3. Control of power plants and power systems. Proceedings

    International Nuclear Information System (INIS)

    Canales-Ruiz, R.

    1996-01-01

    The 88 papers in this volume constitute the proceedings of the International Federation of Automatic Control Symposium held in Mexico in 1995. The broad areas which they cover are: self tuning control; power plant operations; dynamic stability; fuzzy logic applications; power plants modelling; artificial intelligence applications; power plants simulation; voltage control; control of hydro electric units; state estimation; fault diagnosis and monitoring systems; system expansion and operation planning; security assessment; economic dispatch and optimal load flow; adaptive control; distribution; transient stability and preventive control; modelling and control of nuclear plant; knowledge data bases for automatic learning methods applied to power system dynamic security assessment; control of combined cycle units; power control centres. Separate abstracts have been prepared for the three papers relating to nuclear power plants. (UK)

  4. Safety-related decision making at a nuclear power plant

    International Nuclear Information System (INIS)

    Vaurio, J.K.

    1998-01-01

    The decision making environment of an operating nuclear power plant is presented. The organizations involved, their roles and interactions as well as the main influencing factors and decision criteria are described. The focus is on safety-related decisions, and the framework is based on the situation at Loviisa power station. The role of probabilistic safety assessment (PSA) is illustrated with decisions concerning plant modifications, optimization, acceptance of temporary configurations and extended repair times. Suggestions are made for rational and flexible risk-based control of allowed times to operate the plant with some components out of service. (orig.)

  5. Development of high-reliability control system for nuclear power plants

    International Nuclear Information System (INIS)

    Asami, K.; Yanai, K.; Hirose, H.; Ito, T.

    1983-01-01

    In Japan, many nuclear power generating plants are in operation and under construction. There is a general awareness of the problems in connection with nuclear power generation and strong emphasis is put on achieving highly reliable operation of nuclear power plants. Hitachi has developed a new high-reliability control system. NURECS-3000 (NUclear Power Plant High-REliability Control System), which is applied to the main control systems, such as the reactor feedwater control system, the reactor recirculation control system and the main turbine control system. The NURECS-3000 system was designed taking into account the fact that there will be failures, but the aim is for the system to continue to function correctly; it is therefore a fault-tolerant system. It has redundant components which can be completely isolated from each other in order to prevent fault propagation. The system has a hierarchical configuration, with a main controller, consisting of a triplex microcomputer system, and sub-loop controllers. Special care was taken to ensure the independence of these subsystems. Since most of the redundant system failures are caused by common-mode failures and the reliability of redundant systems depends on the reliability of the common-mode parts, the aim was to minimize these parts. (author)

  6. An artificial intelligence approach towards disturbance analysis in nuclear power plants

    International Nuclear Information System (INIS)

    Lindner, A.; Klebau, J.; Fielder, U.; Baldeweg, F.

    1987-01-01

    The scale and degree of sophistication of technological plants, e.g. nuclear power plants, have been essentially increased during the last decades. Conventional disturbance analysis systems have proved to work successfully in wellknown situations. But in cases of emergencies, the operator staff needs a more advanced assistance in realizing diagnosis and therapy control. The significance of introducing artificial intelligence methods in nuclear power technology is emphasized. Main features of the on-line disturbance analysis system SAAP-2 are reported about. It is being developed for application in nuclear power plants. 9 refs. (author)

  7. Development of robots for nuclear power plants

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi

    1982-01-01

    In nuclear power plants, the reduction of maintenance time, the reduction of radiation exposure and man-power saving are increasingly required. To achieve these purposes, various remote-controlled devices, such as robots in a broad sense, have been earnestly developed. Of these, three machines for replacing, four devices for inspection, two systems for cleaning, and two equipment for processing are tabulated in this paper. Typical eight machines or equipment are briefly introduced, mainly describing their features or characteristics. Those are: a remotely handling machine for control rod drive mechanism, an automatic refueling machine, an automatic ultrasonic flaw detection system replacing for a manually operated testing system for the welded parts of primary cooling system, an automatic cask washing machine for decontamination, a floor-type remote inspection vehicle for various devices operating inside power plants, a monorail-type remote inspection vehicle for inspection in spaces where floor space is short, and a remote-controlled automatic pipe welding machine for welding operations in a radioactive environment such as replacing the piping of primary cooling system. Most of these devices serves for radiation exposure reduction at the same time. Existing nuclear power plant design assumes direct manual maintenance, which limits the introduction of robots. Future nuclear power plants should be designed on the assumption of automatic remote-controlled tools and devices being used in maintenance work. (Wakatsuki, Y.)

  8. Modifications to nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    control and that the modified configuration conforms to the approved basis for granting a nuclear power plant operating licence. The main purpose of the recommendations concerning changes of management is to give general guidance on performing those changes in such a way that the safety of the plant is not compromised. This Safety Guide deals with the intended modification of structures, systems and components, operational limits and conditions, procedures and software, and the management systems and tools for the operation of a nuclear power plant. The recommendations made cover the whole modification process, from conception to completion. The justification for undertaking modifications is outside the scope of this Safety Guide. The modification and/or refurbishment of nuclear power plants for the purpose of extending the design lifetime could necessitate many major design modifications and special re-evaluation of plant safety (see Ref. [2]), and is therefore outside the scope of this publication. Section 2 gives guidance on general methods for modifications that could be implemented at nuclear power plants. Section 3 identifies the roles and responsibilities of various organizations involved in the modification process. Sections 4 and 5 give guidance on the different types of modification and their assessment in respect of safety aspects, and Section 4 provides guidelines on subsequent categorization. Section 6 deals with aspects of temporary modifications. Sections 7 and 8 give guidance on implementation of different types of modifications. Sections 9, 10 and 11 give basic recommendations on quality assurance, training and management of documentation. Comprehensive guidance on these matters can be found in the appropriate Safety Guides

  9. Modifications to nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2007-01-01

    control and that the modified configuration conforms to the approved basis for granting a nuclear power plant operating licence. The main purpose of the recommendations concerning changes of management is to give general guidance on performing those changes in such a way that the safety of the plant is not compromised. This Safety Guide deals with the intended modification of structures, systems and components, operational limits and conditions, procedures and software, and the management systems and tools for the operation of a nuclear power plant. The recommendations made cover the whole modification process, from conception to completion. The justification for undertaking modifications is outside the scope of this Safety Guide. The modification and/or refurbishment of nuclear power plants for the purpose of extending the design lifetime could necessitate many major design modifications and special re-evaluation of plant safety, and is therefore outside the scope of this publication. Section 2 gives guidance on general methods for modifications that could be implemented at nuclear power plants. Section 3 identifies the roles and responsibilities of various organizations involved in the modification process. Sections 4 and 5 give guidance on the different types of modification and their assessment in respect of safety aspects, and Section 4 provides guidelines on subsequent categorization. Section 6 deals with aspects of temporary modifications. Sections 7 and 8 give guidance on implementation of different types of modifications. Sections 9, 10 and 11 give basic recommendations on quality assurance, training and management of documentation. Comprehensive guidance on these matters can be found in the appropriate Safety Guides

  10. Wall thinning of piping in power plants

    International Nuclear Information System (INIS)

    Ohta, Joji; Inada, Fumio; Morita, Ryo; Kawai, Noboru; Yoneda, Kimitoshi

    2005-01-01

    Major mechanisms causing wall thinning of piping in power plants are flow accelerated corrosion (FAC), cavitation erosion and droplet erosion. Their fundamental aspects are reviewed on the basis of literature data. FAC is chemical process and it is affected by hydrodynamic factors, temperature, pH, dissolved oxygen concentration and chemical composition of materials. On the other hand, cavitation erosion and droplet erosion are mechanical process and they are mainly affected by hydrodynamic factors and mechanical properties of materials. Evaluation codes for FAC and mitigation methods of FAC and the erosion are also described. Wall thinning of piping is one of public concerns after an accident of a pipe failure at Mihama Nuclear Power Plant Unit 3, Kansai Electric Power Co., Inc., in August 2004. This paper gives comprehensive understanding of the wall thinning mechanism. (author)

  11. Preparation and concept of geodesy work on the Temelin nuclear power plant site

    International Nuclear Information System (INIS)

    Vincik, K.; Zdobinsky, J.

    1989-01-01

    Listed are the main partners in the Temelin nuclear power plant construction (investor, general designer, building and equipment parts suppliers), the main specifications of the power plant, the layout of buildings, the types of construction documentation, and the concept of geodesy work. A network was laid out comprising 9 points and a local coordinate system and an elevation system for design work were determined. Within the layout, a network of basic elevation points with depth stabilization and a starting 6-point level network were proposed. The updating is described of the layout network and of the organization of geodesy work during the construction of the Temelin nuclear power plant. (E.J.)

  12. HOW ECOLOGICAL ENGINEERING HELPED TO CONTINUE BUILDING AND UPGRADE OF THE OPOLE POWER PLANT

    Directory of Open Access Journals (Sweden)

    Jan Siuta

    2016-09-01

    Full Text Available Principles of ecological engineering were applied for upgrading the Opole Power Plant under construction, complete with modern installation to protect the environment. The modernized project was a subject of „Integrated environmental impact assessment of the Opole Power Plant” developed by the Institute of Environmental Protection in 1981. The main issues covered by the impact assessment were presented and discussed at the national scientific conference attended, among others, by the representatives of local community from Opole. The conference was organized by the Polish Society of Ecological Engineering on June 5 and 6, 1992. The main aim of the conference was to identify and deliver as broad as possible analysis of environmental conditions for designing, building and operating coal fired power plants. A secondary goal, though of main concern for the Opole agglomeration, was to evaluate many-sided environmental risks resulting from the construction and operation of the Power Plant. The feasibility of continuing the construction of a power generating facility that meets the requirements of the 21st century was demonstrated by the fact that the Opole Power Plant S.A. was awarded the ISO 14001 - Environmental Management System certificate by the British Standards Institution. Advanced construction of the two consecutive blocks of a combined power of 1800 MW in the Opole Power Plant substantiates the validity and effectiveness of the conference organized in 1992.

  13. Efficiency assessment and benchmarking of thermal power plants in India

    International Nuclear Information System (INIS)

    Shrivastava, Naveen; Sharma, Seema; Chauhan, Kavita

    2012-01-01

    Per capita consumption of electricity in India is many folds lesser than Canada, USA, Australia, Japan, Chaina and world average. Even though, total energy shortage and peaking shortage were recorded as 11.2% and 11.85%, respectively, in 2008–09 reflecting non-availability of sufficient supply of electricity. Performance improvement of very small amount can lead to large contribution in financial terms, which can be utilized for capacity addition to reduce demand supply gap. Coal fired thermal power plants are main sources of electricity in India. In this paper, relative technical efficiency of 60 coal fired power plants has been evaluated and compared using CCR and BCC models of data envelopment analysis. Target benchmark of input variables has also been evaluated. Performance comparison includes small versus medium versus large power plants and also state owned versus central owned versus private owned. Result indicates poor performance of few power plants due to over use of input resources. Finding reveals that efficiency of small power plants is lower in comparison to medium and large category and also performance of state owned power plants is comparatively lower than central and privately owned. Study also suggests different measures to improve technical efficiency of the plants. - Highlights: ► This study evaluates relative technical efficiency of 60 coal fired thermal power plants of India. ► Input oriented CCR and BCC models of data envelopment analysis have been used. ► Small, medium and large power plants have been compared. ► Study will help investor while setting up new power projects. ► Power plants of different ownerships have also been compared.

  14. Bio-oil fueled diesel power plant; Biooeljyllae toimiva dieselvoimala

    Energy Technology Data Exchange (ETDEWEB)

    Vuorinen, A. [Modigen Oy, Helsinki (Finland)

    1995-12-31

    The project mission is to develop a diesel power plant which is capable of using liquid bio-oils as the main fuel of the power plant. The applicable bio-oils are rape seed oils and pyrolysis oils. The project was started in 1994 by installing a 1.5 MW Vasa 4L32 engine in VTT Energy laboratory in Otaniemi. During 1995 the first tests with the rape seed oils were made. The tests show that the rape seed oil can be used in Vasa 32 engines without difficulties. In the second phase of the project during 1996 and 1997 pyrolysis oil made of wood will be tested. Finally a diesel power plant concept with integrated pyrolysis oil, electricity and heat production will be developed

  15. Bio-oil fueled diesel power plant; Biooeljyllae toimiva dieselvoimala

    Energy Technology Data Exchange (ETDEWEB)

    Vuorinen, A [Modigen Oy, Helsinki (Finland)

    1996-12-31

    The project mission is to develop a diesel power plant which is capable of using liquid bio-oils as the main fuel of the power plant. The applicable bio-oils are rape seed oils and pyrolysis oils. The project was started in 1994 by installing a 1.5 MW Vasa 4L32 engine in VTT Energy laboratory in Otaniemi. During 1995 the first tests with the rape seed oils were made. The tests show that the rape seed oil can be used in Vasa 32 engines without difficulties. In the second phase of the project during 1996 and 1997 pyrolysis oil made of wood will be tested. Finally a diesel power plant concept with integrated pyrolysis oil, electricity and heat production will be developed

  16. Bio-oil fuelled diesel power plant; Biooeljyllae toimiva dieselvoimala

    Energy Technology Data Exchange (ETDEWEB)

    Vuorinen, A [Modigen Oy, Helsinki (Finland)

    1997-12-01

    The project mission is to develop a diesel power plant which is capable of using liquid bio-oils as the main fuel of the power plant. The applicable bio-oils are rape seed oils and pyrolysis oils. The project was started in 1994 by installing a 1.5 MW Vasa 4L32 engine in VTT Energy laboratory in Otaniemi. During 1995 the first tests with the rape seed oils were made. The tests show that the rape seed oil can be used in Vasa 32 engines without difficulties. In the second phase of the project during 1996 pyrolysis oil made of wood was tested. Finally a diesel power plant concept with integrated pyrolysis oil, electricity and heat production will be developed

  17. Radiation burden of population in nuclear power plant siting

    International Nuclear Information System (INIS)

    Navratil, J.

    The significance is discussed of the determination of the radiobiological consequences of normal operation and design basis accidents in nuclear power plant siting. The basic diagram and brief description is given of the programme for calculating the radiation load of the population in the surroundings of the nuclear power plant. The programme consists of two subprogrammes, i.e., the dispersion of radioactive gases (for normal operation and for accidents), the main programme for the determination of biological consequences and one auxiliary programme (the distribution of the population in the surroundings of the power plant). The four most important types of exposure to ionizing radiation are considered, namely inhalation, external irradiation from a cloud, ingestion (water, milk, vegetables), external irradiation from the deposit. (B.S.)

  18. Harmonic Resonances in Wind Power Plants

    DEFF Research Database (Denmark)

    Fernandez, Francisco Daniel Freijedo; Chaudhary, Sanjay; Teodorescu, Remus

    2015-01-01

    This work reviews the state-of-the-art in the field of harmonic resonance problems in Wind Power Plants (WPPs). Firstly, a generic WPP is modeled according to the equivalent circuits of its passive and active components. Main focus is put on modeling active components, i.e. the ones based on power...... converters. Subsequently, pros and cons of frequency and time domain analysis methods are outlined. The next sections are devoted to mitigation methods implemented in the power electronics converters. From the wind turbine perspective, different techniques to enhance the robustness of the controller...... are analyzed. Subsequently, the suitability for active damping of harmonics using STATCOM devices is assessed, with focus both on control techniques and power converter technologies....

  19. Optimisation of VSC-HVDC Transmission for Wind Power Plants

    DEFF Research Database (Denmark)

    Silva, Rodrigo Da

    Connection of Wind Power Plants (WPP), typically oshore, using VSCHVDC transmission is an emerging solution with many benefits compared to the traditional AC solution, especially concerning the impact on control architecture of the wind farms and the grid. The VSC-HVDC solution is likely to meet...... more stringent grid codes than a conventional AC transmission connection. The purpose of this project is to analyse how HVDC solution, considering the voltage-source converter based technology, for grid connection of large wind power plants can be designed and optimised. By optimisation, the project...... the robust control technique is applied is compared with the classical proportional-integral (PI) performance, by means of time domain simulation in a point-to-point HVDC connection. The three main parameters in the discussion are the wind power delivered from the offshore wind power plant, the variation...

  20. Electrical Structure of Future Off-shore Wind Power Plant with a High Voltage Direct Current Power Transmission

    DEFF Research Database (Denmark)

    Sharma, Ranjan

    The increasing demand of electric power and the growing consciousness towards the changing climate has led to a rapid development of renewable energy in the recent years. Among all, wind energy has been the fastest growing energy source in the last decade. But the growing size of wind power plants......, better wind conditions at off-shore and the general demand to put them out of sight have all contributed to the installation of large wind power plants in off-shore condition. However, moving wind power plants far out in the off-shore comes with many associated problems. One of the main challenges...... is the transmission of power over long distance. Historically, the power transmission from off-shore wind power plants has been done via HVAC submarine cables. This provides a simple solution, but AC cables cannot be arbitrarily long. It is shown in the report that major issues with HVAC cable transmission system...

  1. Nuclear accidents and safety measures of domestic nuclear power plants

    International Nuclear Information System (INIS)

    Song Zurong; Che Shuwei; Pan Xiang

    2012-01-01

    Based on the design standards for the safety of nuclear and radiation in nuclear power plants, the three accidents in the history of nuclear power are analyzed. And the main factors for these accidents are found out, that is, human factors and unpredicted natural calamity. By combining the design and operation parameters of domestic nuclear plants, the same accidents are studied and some necessary preventive schemes are put forward. In the security operation technology of domestic nuclear power plants nowadays, accidents caused by human factors can by prevented completely. But the safety standards have to be reconsidered for the unpredicted neutral disasters. How to reduce the hazard of nuclear radiation and leakage to the level that can be accepted by the government and public when accidents occur under extreme conditions during construction and operation of nuclear power plants must be considered adequately. (authors)

  2. Industrial safety in power plants

    International Nuclear Information System (INIS)

    1987-01-01

    The proceedings of the VGB conference 'Industrial safety in power plants' held in the Gruga-Halle, Essen on January 21 and 22, 1987, contain the papers reporting on: Management responsibility for and legal consequences of industrial safety; VBG 2.0 Industrial Accident Prevention Regulation and the power plant operator; Operational experience gained with wet-type flue gas desulphurization systems; Flue gas desulphurization systems: Industrial-safety-related requirements to be met in planning and operation; the effects of the Hazardous Substances Ordinance on power plant operation; Occupational health aspects of heat-exposed jobs in power plants; Regulations of the Industrial Accident Insurance Associations concerning heat-exposed jobs and industrial medical practice; The new VBG 30 Accident Prevention Regulation 'Nuclear power plants'; Industrial safety in nuclear power plants; safe working on and within containers and confined spaces; Application of respiratory protection equipment in power plants. (HAG) [de

  3. Development of a web-based monitoring system using operation parameters for the main component in nuclear power plants

    International Nuclear Information System (INIS)

    Son, Dong Chan; An, Kung Il; Hong, Suk Young; Lee, Jeong Soo; Jung, Duk Jin; Shin, Sun Hee; Son, So Hee

    2004-02-01

    The frequency of the damage is increasing, which is caused by the fatigue, according to the increase of running of nuclear power plants. So we need to acquire the reliance of design data to estimate the fatigue and damage of major machinery that might happen as time-dependent crack growth characterization. The research is focused on keeping operating record of nuclear power plants about major machinery which consists of a nuclear reactor pressure boarder on each excessive operating condition including normal operating and extraordinary operating by estimating fracture mechanical movements on real time and fatigue about major nuclear power plants machinery, which are acquired the pressure and temperature data. For further details about the scope and contents of R and D are following. Development of H/W that is necessary to acquire operating real time data of heating and hydraulic power. Selection of a safety variable about major system by each type (the four NPP, all unit). Communication protocol development for connecting between CARE system data base server and fatigue monitoring system data base server. Development of connecting database for controlling and storing of heating and hydraulic power operating data. Real time monitoring system development based on Web using JAVA

  4. Development of a web-based monitoring system using operation parameters for the main component in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Son, Dong Chan; An, Kung Il; Hong, Suk Young; Lee, Jeong Soo; Jung, Duk Jin; Shin, Sun Hee; Son, So Hee [Daesang Information Technology Co., Ltd., Seoul (Korea, Republic of)

    2004-02-15

    The frequency of the damage is increasing, which is caused by the fatigue, according to the increase of running of nuclear power plants. So we need to acquire the reliance of design data to estimate the fatigue and damage of major machinery that might happen as time-dependent crack growth characterization. The research is focused on keeping operating record of nuclear power plants about major machinery which consists of a nuclear reactor pressure boarder on each excessive operating condition including normal operating and extraordinary operating by estimating fracture mechanical movements on real time and fatigue about major nuclear power plants machinery, which are acquired the pressure and temperature data. For further details about the scope and contents of R and D are following. Development of H/W that is necessary to acquire operating real time data of heating and hydraulic power. Selection of a safety variable about major system by each type (the four NPP, all unit). Communication protocol development for connecting between CARE system data base server and fatigue monitoring system data base server. Development of connecting database for controlling and storing of heating and hydraulic power operating data. Real time monitoring system development based on Web using JAVA.

  5. NUCLEAR POWER PLANT

    Science.gov (United States)

    Carter, J.C.; Armstrong, R.H.; Janicke, M.J.

    1963-05-14

    A nuclear power plant for use in an airless environment or other environment in which cooling is difficult is described. The power plant includes a boiling mercury reactor, a mercury--vapor turbine in direct cycle therewith, and a radiator for condensing mercury vapor. (AEC)

  6. Nuclear power plant ageing management programmes in foreign countries

    International Nuclear Information System (INIS)

    Simola, K.; Laakso, K.; Pekkonen, A.

    1992-09-01

    The report describes ageing studies of nuclear power plants and research programmes on plant life extension in foreign countries. Ageing studies are aimed to ascertain that the availability and safety of components and structures can be maintained throughout the plant lifetime. In life extension programmes the purpose is to evaluate the technical and economical possibilities to extend the plant lifetime beyond the originally planned operation period, without reducing the plant safety. The main emphasis of the report is put on the ageing and life extension programmes in the United States. Besides the U.S. studies, research on plant life extension possibilities conducted in France and Japan are also described. Examples of studies performed in other nuclear energy producing countries are given. These examples are mainly related to the development of maintenance programmes and techniques

  7. Optimization-based reactive power control in HVDC-connected wind power plants

    OpenAIRE

    Schönleber, Kevin; Collados Rodríguez, Carlos; Teixeira Pinto, Rodrigo; Ratés Palau, Sergi; Gomis Bellmunt, Oriol

    2017-01-01

    One application of high–voltage dc (HVdc) systems is the connection of remotely located offshore wind power plants (WPPs). In these systems, the offshore WPP grid and the synchronous main grid operate in decoupled mode, and the onshore HVdc converter fulfills the grid code requirements of the main grid. Thus, the offshore grid can be operated independently during normal conditions by the offshore HVdc converter and the connected wind turbines. In general, it is well known that optimized react...

  8. Modernization of Kozloduy nuclear plant unit 5 and 6, implementation of measures to improve the reliability of the main generator system

    International Nuclear Information System (INIS)

    Stinshoff, H.

    2003-01-01

    To improve the reliability of Kozloduy Nuclear power plant several modernization measures will be implemented during the outages in the years 2003 to 2005. In the area of the main generator the following measures will be performed in unit 6 during 2003 outage: - Replacement of main generator circuit breaker by new SF6 cooled breaker type - Replacement of main generator excitation system by new two channel digital system - Replacement of main generator protection by new digital multi-purpose protections including digital fault recorders - Installation of radio frequency monitoring system of main generator circuit Starting from the present situation the new concept is explained. The project organization under consideration of large Bulgarian participation as well as the sequence and schedule of the implementation during the short outage time window is shown. These modernization measures lead to an increase of reliability and availability for the operation of the power plant and with this to increase power plant safety

  9. Safety culture in nuclear power plants. Proceedings

    International Nuclear Information System (INIS)

    1994-12-01

    As a consequence of the INSAG-4 report on 'safety culture', published by the IAEA in 1991, the Federal Commission for the Safety of Nuclear Power Plants (KSA) decided to hold a one-day seminar as a first step in this field. The KSA is an advisory body of the Federal Government and the Federal Department of Transport and Energy (EVED). It comments on applications for licenses, observes the operation of nuclear power plants, assists with the preparation of regulations, monitors the progress of research in the field of nuclear safety, and makes proposals for research tasks. The objective of this seminar was to familiarise the participants with the principles of 'safety culture', with the experiences made in Switzerland and abroad with existing concepts, as well as to eliminate existing prejudices. The main points dealt with at this seminar were: - safety culture from the point of view of operators, - safety culture from the point of view of the authorities, - safety culture: collaboration between power plants, the authorities and research organisations, - trends and developments in the field of safety culture. Invitations to attend this seminar were extended to the management boards of companies operating Swiss nuclear power plants, and to representatives of the Swiss authorities responsible for the safety of nuclear power plants. All these organisations were represented by a large number of executive and specialist staff. We would like to express our sincerest thanks to the Head of the Federal Department of Transport and Energy for his kind patronage of this seminar. (author) figs., tabs., refs

  10. Survey of strong motion earthquake effects on thermal power plants in California with emphasis on piping systems. Volume 1, Main report

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-11-01

    Since 1982, there has been a major effort expended to evaluate the susceptibility of nuclear Power plant equipment to failure and significant damage during seismic events. This was done by making use of data on the performance of electrical and mechanical equipment in conventional power plants and other similar industrial facilities during strong motion earthquakes. This report is intended as an extension of the seismic experience data collection effort and a compilation of experience data specific to power plant piping and supports designed and constructed US power piping code requirements which have experienced strong motion earthquakes. Eight damaging (Richter Magnitude 7.7 to 5.5) California earthquakes and their effects on 8 power generating facilities in use natural gas and California were reviewed. All of these facilities were visited and evaluated. Seven fossel-fueled (dual use natural gas and oil) and one nuclear fueled plants consisting of a total of 36 individual boiler or reactor units were investigated. Peak horizontal ground accelerations that either had been recorded on site at these facilities or were considered applicable to these power plants on the basis of nearby recordings ranged between 0.20g and 0.5lg with strong motion durations which varied from 3.5 to 15 seconds. Most US nuclear power plants are designed for a safe shutdown earthquake peak ground acceleration equal to 0.20g or less with strong motion durations which vary from 10 to 15 seconds

  11. Anthropometric Considerations in the Modernized Main Control Room: Application to a Virtual Nuclear Power Plant Control Panel

    International Nuclear Information System (INIS)

    Yang, Chih Wei; Cheng, Tsung Chieh; Lin, Chiuhsiang Joe

    2011-01-01

    This study investigates the anthropometric considerations in the main control room (MCR) application to a virtual nuclear power plant (NPP) control panel. Influences of working postures and physical demands on the operational performance are also discussed. Finally, the present research provides a case example to illustrate the influences of anthropometric considerations on the control panel design for MCR operators by applying virtual reality (VR) technology. The MCR design primarily evolved in different countries. The datasets available is usually insufficient or inconsistent for the end users. To solve the upper mentioned problem, this study put emphasis on applying VR technology to anthropometric considerations support control panel design in the modernized MCR. Although the concept of applying VR technology on anthropometric considerations in this paper is related to the MCR in NPPs, it could be easily applied for the purposes of any type of control room in a similar manner

  12. Anthropometric Considerations in the Modernized Main Control Room: Application to a Virtual Nuclear Power Plant Control Panel

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Chih Wei; Cheng, Tsung Chieh [Institute of Nuclear Energy Research, Taoyuan (China); Lin, Chiuhsiang Joe [Chung-Yuan Christian University, Chung Li (China)

    2011-08-15

    This study investigates the anthropometric considerations in the main control room (MCR) application to a virtual nuclear power plant (NPP) control panel. Influences of working postures and physical demands on the operational performance are also discussed. Finally, the present research provides a case example to illustrate the influences of anthropometric considerations on the control panel design for MCR operators by applying virtual reality (VR) technology. The MCR design primarily evolved in different countries. The datasets available is usually insufficient or inconsistent for the end users. To solve the upper mentioned problem, this study put emphasis on applying VR technology to anthropometric considerations support control panel design in the modernized MCR. Although the concept of applying VR technology on anthropometric considerations in this paper is related to the MCR in NPPs, it could be easily applied for the purposes of any type of control room in a similar manner.

  13. Power plants 2010. Lectures

    International Nuclear Information System (INIS)

    2010-01-01

    The proceedings include the following lectures: Facing the challenges - new structures for electricity production. Renewable energies in Europe - chances and challenges. Nuclear outlook in the UK. Sustainable energy for Europe. Requirements of the market and the grid operator at the electricity production companies. Perspectives for the future energy production. Pumped storage plants - status and perspectives. Nuclear power/renewable energies -partners or opponents? New fossil fired power stations in Europe - status and perspectives. Nuclear energy: outlook for new build and lifetime extension in Europe. Biomass in the future European energy market - experiences for dong energy. Meeting the EU 20:20 renewable energy targets: the offshore challenges. DESERTEC: sustainable electricity for Europe, Middle East and North Africa. New power plants in Europe - a challenge for project and quality management. Consideration of safely in new build activities of power plants. Challenges to an integrated development in Maasvlakte, Netherlands. Power enhancement in EnBW power plants. Operational experiences of CCS pilot plants worldwide. Two years of operational experiences with Vattenfall's oxyfuel pilot plant. Pre-conditions for CCS. Storage technologies for a volatile generation. Overview: new generation of gas turbines.

  14. Tecnatom support to new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, A. B.

    2009-10-01

    Tecnatom is a Spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. It has worked in over 30 countries in activities related to the operation and maintenance of nuclear power plants. Along this half century of history. Tecnatom has been providing its services to nuclear utilities, regulators, NPP vendors, NPP owners / operators and nuclear fuel manufacturers not only in Spain but also abroad. It started to work in the design of new nuclear power plants in the early 90 s and since then has continued collaborating with different suppliers in the design and licensing of new reactors especially in the areas of plant systems design, man-machine interface design, main control room simulators building, training, qualification of equipment and PSI/ISI engineering services. Some challenges to the reactivation of nuclear power plants construction are common worldwide, including: regulatory processes, workforce availability, construction project management, etc. Being some keys to success the following: apply qualified resources, enough resources for early planning, project leadership, organization and integration, establish a strong integrated management team. The goal of this paper is to inform regarding the capabilities of Tecnatom in the construction of new power plants. (Author)

  15. The year 2000 power plant

    International Nuclear Information System (INIS)

    Roman, H.T.

    1989-01-01

    Every utility seeks extended service life from its existing power plants before building new ones. It is not easy to justify a new power plant. The licensing and cost of new plants have become uncertain. In response to these conditions, electric utilities are undertaking plant life-extension studies and, in some cases, reconditioning/upgrading old power plants to significantly increase useful service life. Other technologies like robotics and artificial intelligence/expert systems are also being developed to reduce operating and maintenance (O and M) expenses, to remove workers from potentially hazardous environments, and to reduce plant downtime. Together, these steps represent an interim solution, perhaps providing some relief for the next few decades. However, there are serious physical and economic limits to retrofitting new technology into existing power plants. Some old plants will simply be beyond their useful life and require retirement. In nuclear plants, for instance, retrofit may raise important and time-consuming licensing/safety issues. Based on their robotics and artificial intelligence experience, the authors of this article speculate bout the design of the year 2000 power plant - a power plant they feel will naturally incorporate liberal amounts of robotic and artificial intelligence technologies

  16. Belene nuclear power plant contracting approach

    International Nuclear Information System (INIS)

    Tankosic, D.; Mignone, O.

    2004-01-01

    Historically, three main types of project execution and contractual approaches have been applied to energy and industrial projects, including nuclear projects. These approaches are grouped into three broad categories: 1) Turnkey Approach; 2) Split Package (Island) Approach; and 3)Multiple Package Approach. Based on a preliminary screening done by an ongoing feasibility study work for NPP Belene (NEK contract to Parsons E and C), the recommended approach is going to follow that general trend i.e., with some variation between the Split Package and the Turnkey approach. Before deciding on an execution approach or at least before issuing bid specifications for the nuclear power plant, it is prudent, even for a country with existing nuclear power program (like Bulgaria), to re-check/verify capabilities of the interested bidders to handle contracts of this size and nature. During the last decades, nuclear energy went through a substantial restructuring and most of the capabilities (human and financial) that existed before are not any more available. This re-checking should mainly cover the experience of the bidders as regards the design, construction and operation of the stations where they were involved, but also include items such as local experience, capability to bring favorable financing, liability coverage, general background, potential and organizational structures. The advantages and disadvantages for the Owner of the three contracting approaches can be briefly summarized as follows: Turnkey Approach - main advantages: all responsibilities rest in a Contractor or Consortium. Main disadvantages - limited project control by Owner and restricted local participation. For Split Package Contract Approach main advantage are more favorable financing conditions and increased local participation. Main disadvantage is the increased interface problems. For Multiple package Contract Approach main advantages are the opportunity to tailor the plant and maximum increase of local

  17. Adaptation of thermal power plants: The (ir)relevance of climate (change) information

    International Nuclear Information System (INIS)

    Bogmans, Christian W.J.; Dijkema, Gerard P.J.; Vliet, Michelle T.H. van

    2017-01-01

    When does climate change information lead to adaptation? We analyze thermal power plant adaptation by means of investing in water-saving (cooling) technology to prevent a decrease in plant efficiency and load reduction. A comprehensive power plant investment model, forced with downscaled climate and hydrological projections, is then numerically solved to analyze the adaptation decisions of a selection of real power plants. We find that operators that base their decisions on current climatic conditions are likely to make identical choices and perform just as well as operators that are fully ‘informed’ about climate change. Where electricity supply is mainly generated by thermal power plants, heat waves, droughts and low river flow may impact electricity supply for decades to come. - Highlights: • We analyze adaptation to climate change by thermal power plants. • A numerical investment model is applied to a coal plant and a nuclear power plant. • The numerical analysis is based on climate and hydrological projections. • Climate change information has a relatively small effect on a power plant's NPV. • Uncertainty and no-regret benefits lower the value of climate change information.

  18. The power plant among Three Gorges; Kraftstasjonen blant Tre kloefter

    Energy Technology Data Exchange (ETDEWEB)

    Stensvold, Tore

    2003-07-01

    In 2009 the Three Gorges power station on the Yangtze River in China will be completed, with 26 turbines that together will produce 84.60 TWh/year. In this article a Norwegian expert describes his experience from a tourist visit, approaching the plant onboard a cruise ship. In addition to giving the main technical data he comments on peoples' resistance against being transferred, on scepticism and fear of a dam break, on the shortcomings of the power grid and on the not very extensive Norwegian contribution to the world's largest power plant.

  19. Safety-related incidents at the Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, P.

    1986-03-01

    This report contains detailed descriptions of operating incidents and other safety-related matters at the Finnish nuclear power plants regarded as significant by the regulatory authority, the Finnish Centre for Radiation and Nuclear Safety. In this connection, an account is given of the practical actions caused by the incidents, and their significance to reactor safety is evaluated. The main features of the incidents are also described in the general Quartely Reports, Operation of Finnish Nuclear Power Plants, which are supplemented by this report intended for experts. (author)

  20. Safety-related incidents at the Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, P.

    1985-01-01

    This report contains detailed descriptions of operating incidents and other safety-related matters at the Finnish nuclear power plants regarded as significant by the regulatory authority, the Finnish Centre for Radiation and Nuclear Safety. In this connection, an account is given of the practical actions caused by the incidents, and their significance to reactor safety is evaluated. The main features of the incidents are also described in the general Quartely Reports, Operation of Finnish Nuclear Power Plants, which are supplemented by this report intended for experts. (author)

  1. Potential of light water reactors for future nuclear power plants

    International Nuclear Information System (INIS)

    Gueldner, R.

    2003-01-01

    Energy consumption worldwide is going to increase further in the next few decades. Reliable supplies of electricity can be achieved only by centralized power plant structures. In this scenario, nuclear power plants are going to play a leading role as reliable and competitive plants, also under deregulated market conditions. Today, light water reactors have achieved a leading position, both technically and economically, contributing 85% to worldwide electricity generation in nuclear plants. They will continue to be a proven technology in power generation. In many countries, activities therefore are concentrated on extending the service life of plants beyond a period of forty years. New nuclear generating capacities are expected to be created and added from the end of this decade onward. Most of this capacity will be in light water reactors. The concepts of third-generation reactors will meet all economic and technical safety requirements of the 21st century and will offer considerable potential for further development. Probably some thirty years from now, fourth-generation nuclear power plants will be ready for commercial application. These plants will penetrate especially new sectors of the energy markets. Public acceptance of new nuclear power plants is not a matter of reactor lines, provided that safety requirements are met. The important issue is the management of radioactive waste. The construction of new nuclear power plants in Western Europe and North America mainly hinges on the ability to explain to the public that there is a need for new plants and that nuclear power is fundamental to assuring sustainable development. (orig.)

  2. The function of people in a nuclear power plant in operation

    International Nuclear Information System (INIS)

    Pickel, E.

    1986-01-01

    Based mainly on the operating experience of Obrigheim nuclear power plant - a two-loop pressurized water reactor with about 120,000 operating hours - the function of people in the very complex technical field of operation including supervision, maintenance and repair of a nuclear power plant is presented with special attention to safety related activities. The boundaries are indicated where automatic actions for safety and economic reasons are necessary and where manually operated systems are possible or even desirable. Typical examples and figures will show, how the operating people influenced the operation and availability of Obrigheim nuclear power plant. (orig./GL)

  3. Atmospheric emission of 137Cs82 from Beloyarsk nuclear power plant

    Science.gov (United States)

    Kolotkov, G. A.

    2018-01-01

    Citing Beloyarsk nuclear power plant (Russia) as an example, the problem of remote detection of radioactivity in the atmospheric pollution is examined. The comparative analysis of injected radionuclides into the atmosphere from the nuclear power plant with advanced fast neutron reactor is carried out. The main radionuclides throw out into the atmosphere from the nuclear power plant are beta-radionuclides. The secondary and tertiary spectra of beta-electrons decay for artificial radionuclide 137Cs82 is calculated, using Spencer-Fano’s equation. The averaged parameters of initial beta - electrons generated by 137Cs82 decay in the atmosphere is calculated.

  4. Estimation of environmental external costs between coal fired power plant and nuclear power plant

    International Nuclear Information System (INIS)

    Moon, G. H.; Kim, S. S.

    2000-01-01

    First of all, this study evaluated the impacts on the health and the environment of air pollutants emitted from coal power plant and nuclear power pant, two major electric power generating options in Korea. Then, the environmental external costs of those two options were estimated by transforming the health and environment impact into monetary values. To do this, AIRPACTS and Impacts of Atmospheric Release model developed by IAEA were used. The environmental external cost of Samcheonpo coal power plant was estimated about 25 times as much as that of Younggwang nuclear power plant. This result implies that nuclear power plant is a clean technology compared with coal power plant. This study suggests that the external cost should be reflected in the electric system expansion plan in order to allocate energy resources efficiently and to reduce economic impact stemming from the environmental regulation emerged recently on a global level

  5. Nuclear Power Plants in a Competitive Electricity Market

    International Nuclear Information System (INIS)

    Jankauskas, V.

    2002-01-01

    Electricity demand is growing in the world by an average rate of 3% and, according to the International Energy Agency, is going to keep this pace of growth for the 1st quarter of the 21st century. At the same time, the role of the nuclear in the world energy mix is diminishing, and in 2020 only 9% of the world electricity will be produced at the nuclear plants versus 17% in 2000. The main reasons for the nuclear power diminishing share in the world market are not environmental or safety problems, as one may assume, but technical and economical. Long construction time, high capital cost, huge liabilities connected with the spent nuclear fuel and radioactive waste treatment, storage and final disposal are the main factors restricting the further growth of the nuclear power. Nevertheless, in the liberalized markets (U.K., Germany, Scandinavian countries) nuclear power plants are operating rather successfully. In a short run nuclear plants may become very competitive as they have very low short-run marginal costs, but in the long run they may become very in competitive. The Ignalina NPP plays the dominant ro]e in the Lithuanian electricity market, producing more than 75% of the total domestic electricity. It produces the cheapest electricity in Lithuania, mostly due to its higher availability, than the thermal power plants. The price of electricity sold by Ignalina is also lower as it does not cover all costs connected with the future decommissioning of the plant, spent fuel storage and final disposal. If at least part of this cost were included into the selling price, Ignalina might become highly competitive in a liberalised electricity market. As the Lithuanian Electricity law requires to deregulate electricity. generation prices, these prices should be set by the market. (author)

  6. ORC-mall scale power plant

    Energy Technology Data Exchange (ETDEWEB)

    Jokinen, T. [Helsinki Univ. of Technology, Otaniemi (Finland). Lab. of Electromechanics

    1998-12-31

    In the conversion of low temperature heat into electricity, the greatest efficiency is obtained by using a Rankine cycle. The Organic Rankine cycle (ORC) is a Rankine cycle where an organic fluid is used instead of water as the working fluid. In the conventional ORC-solution, an axial turbine drives a standard generator through a high-speed gearbox. The system includes a separate feed pump, vacuum pump, lubrication system and requires several saft seals. The seals of the turbine have a limited working life in particular due to the high speed required. Thus, the entire present conventional ORC-plant is rather complicated and requires maintenance. To avoid these problems, a project was initiated at the Lappeenranta University of Technology to develop a high-speed, process fluid lubricated turbogenerator-feed pump as the prime mover of the ORC. The project has been continued in co-operation with the Helsinki University of Technology under the NEMO 2 program, the main goal being to build a demonstration power plant and to commercialise the project. The goals of the project were: (1) to model the ORC process, turbogenerator, and inverter, (2) to simulate the power plant in different normal and abnormal states, (3) to assess the advantages and disadvantages of various control systems, (4) to study network disturbances such as voltage and current harmonics and to research ways of reducing these disturbances, (5) to optimise heat exchanging surfaces and process parameters, and (6) to participate in the design of the demonstration power plant

  7. Organization patterns of PWR power plants

    International Nuclear Information System (INIS)

    Leicman, J.

    1980-01-01

    Organization patterns are shown for the St. Lucia 1, North Anna, Sequoyah, and Beaver Valley nuclear power plants, for a typical PWR power plant in the USA, for the Biblis/RWE-KWU nuclear power plants and for a four-unit nuclear power plant operated by Electricite de France as well as for the Loviisa power plant. Organization patterns are also shown for relatively independent and non-independent nuclear power plants according to IAEA recommendations. (J.P.)

  8. Nuclear power plant siting

    International Nuclear Information System (INIS)

    Sulkiewicz, M.; Navratil, J.

    The construction of a nuclear power plant is conditioned on territorial requirements and is accompanied by the disturbance of the environment, land occupation, population migration, the emission of radioactive wastes, thermal pollution, etc. On the other hand, a nuclear power plant makes possible the introduction of district heating and increases the economic and civilization activity of the population. Due to the construction of a nuclear power plant the set limits of negative impacts must not be exceeded. The locality should be selected such as to reduce the unfavourable effects of the plant and to fully use its benefits. The decision on the siting of the nuclear power plant is preceded by the processing of a number of surveys and a wide range of documentation to which the given criteria are strictly applied. (B.H.)

  9. Quality surveillance at nuclear power plants

    International Nuclear Information System (INIS)

    Deviney, D.E.

    1990-01-01

    Quality surveillance (QS) of nuclear power plants has been occurring for a number of years and is growing in importance as a management tool for assuring that power plants are operated and maintained safely. Quality surveillance can be identified by many terms, such as monitoring, assessment, technical audits, and others. The name given to the function is not important. Quality surveillance at nuclear power plants developed out of a need. Historically, audits were performed to verify compliance to quality program requirements. Verification of day-to-day implementation of activities was not being performed. This left a void in verification activities since inspections were mainly directed at hardware verification. Quality surveillance, therefore, was born out of a need to fill this void in verification. This paper discusses quality surveillance definition; objectives of QS, activities considered for QS, personnel performing QS. As in any human endeavor, people and the attitudes of those people make a program succeed or fail. In the case of QS this is even more critical because of the overview and exposure given to the nuclear industry. Properly trained and experienced personnel performing QS combined with the right attitude contribute to the successful performance of a QS. This is only one side of the success equation, however; acceptance of and actions taken by plant management establish the total success of a QS program

  10. Wind power plant system services

    DEFF Research Database (Denmark)

    Basit, Abdul; Altin, Müfit

    Traditionally, conventional power plants have the task to support the power system, by supplying power balancing services. These services are required by the power system operators in order to secure a safe and reliable operation of the power system. However, as in the future the wind power...... is going more and more to replace conventional power plants, the sources of conventional reserve available to the system will be reduced and fewer conventional plants will be available on-line to share the regulation burden. The reliable operation of highly wind power integrated power system might...... then beat risk unless the wind power plants (WPPs) are able to support and participate in power balancing services. The objective of this PhD project is to develop and analyse control strategies which can increase the WPPs capability to provide system services, such as active power balancing control...

  11. The basic planning for the environmental relationship of improved nuclear power plant

    International Nuclear Information System (INIS)

    Choi, Seungho; Jung, Hoonseok; Lee, Dongheup

    2003-01-01

    The Improved Nuclear Power Plant (INPP) which design has been emphasized on the safety, technology and environmental relationship is about to be realized after hard works of design improvements, largely changes made from existing PWR nuclear power plants for three years. It will undoubtedly play a leading role of nuclear power generation industry as a main electric power source and secure a place as a successful issue between development and environment throughout nation-wide understanding and support. (author)

  12. Operating experience from Swedish nuclear power plants 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The total production of electricity from Swedish nuclear power plants was 69.2 TWh during 2001, which is an increase of more than 25% compared to 2000. The hydroelectric power production increased to 78.3 TWh, 22% more than during a normal year, i.e. a year with average rainfall. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 9.6 TWh. The electricity generation totalled 157.6 TWh, the highest annual production to date. The preliminary figures for export were 18.5 TWh and and for import 11.1 TWh. Operational statistics are presented for each Swedish reactor. Two events, given INES level 1 rating, are reported from Barsebaeck 2 and Ringhals 2.

  13. Operating experience from Swedish nuclear power plants 2001

    International Nuclear Information System (INIS)

    2002-01-01

    The total production of electricity from Swedish nuclear power plants was 69.2 TWh during 2001, which is an increase of more than 25% compared to 2000. The hydroelectric power production increased to 78.3 TWh, 22% more than during a normal year, i.e. a year with average rainfall. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 9.6 TWh. The electricity generation totalled 157.6 TWh, the highest annual production to date. The preliminary figures for export were 18.5 TWh and and for import 11.1 TWh. Operational statistics are presented for each Swedish reactor. Two events, given INES level 1 rating, are reported from Barsebaeck 2 and Ringhals 2

  14. NORM emissions from heavy oil and natural gas fired power plants in Syria

    International Nuclear Information System (INIS)

    Al-Masri, M.S.; Haddad, Kh.

    2012-01-01

    Naturally occurring radioactive materials (NORM) have been determined in fly and bottom ash collected from four major Syrian power plants fired by heavy oil and natural gas. 210 Pb and 210 Po were the main NORM radionuclides detected in the fly and bottom ash. 210 Pb activity concentrations have reached 3393 ± 10 Bq kg −1 and 4023 ± 7 Bq kg −1 in fly ash and bottom ash, respectively; lower values of 210 Po were observed due to its high volatility. In addition, 210 Po and 210 Pb annual emissions in bottom ash from mixed (heavy oil and natural gas) fired power plants varied between 2.7 × 10 9 –7.95 × 10 9 Bq and 3.5 × 10 9 –10 10 Bq, respectively; higher emissions of 210 Po and 210 Pb from gas power plants being observed. However, the present study showed that 210 Po and 210 Pb emissions from thermal power plants fired by natural gas are much higher than the coal power plants operated in the World. - Highlights: ► NORM have been determined in fly and bottom ash collected from Syrian power plants fired by heavy oil and natural gas. ► 210 Pb and 210 Po were the main NORM radionuclides detected in the fly and bottom ash. ► 210 Po and 210 Pb annual emissions from these power plants were estimated.

  15. Elecnuc. Nuclear power plants in the world; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    This 2003 version of Elecnuc contents information, data and charts on the nuclear power plants in the world and general information on the national perspectives concerning the electric power industry. The following topics are presented: 2002 highlights; characteristics of main reactor types and on order; map of the French nuclear power plants; the worldwide status of nuclear power plants on 2002/12/3; units distributed by countries; nuclear power plants connected to the Grid by reactor type groups; nuclear power plants under construction; capacity of the nuclear power plants on the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear plants by country at the end 2002; performance indicator of french PWR units; trends of the generation indicator worldwide from 1960 to 2002; 2002 cumulative Load Factor by owners; nuclear power plants connected to the grid by countries; status of license renewal applications in Usa; nuclear power plants under construction; Shutdown nuclear power plants; exported nuclear power plants by type; exported nuclear power plants by countries; nuclear power plants under construction or order; steam generator replacements; recycling of Plutonium in LWR; projects of MOX fuel use in reactors; electricity needs of Germany, Belgium, Spain, Finland, United Kingdom; electricity indicators of the five countries. (A.L.B.)

  16. Bubbling fluidized bed boiler for Vanaja power plant

    Energy Technology Data Exchange (ETDEWEB)

    Sormunen, R.; Haermae, P.; Vessonen, K.; Ketomaeki, A. [ed.

    1998-07-01

    At the Vanaja Power Plant, on the outskirts of Haemeenlinna, there have been changes which reflect the central goals in IVO`s product development work. At Vanaja, efficiency is combined with environmental friendliness. In the early 1980s, the plant was modernized to produce district heat in addition to electricity. At that time, along with the new gas turbine at the plant, the main fuel, coal, while remaining the fuel for the old boilers, was replaced by natural gas. This year a new type of bubbling fluidized bed boiler enabling continuous use of peat and trial use of biofuels along with coal was introduced at the plant. In addition to the Nordic countries, this kind of technology is required in central eastern Europe, where modernization of ageing power plants is being planned to achieve the best possible solutions in respect of production and the environment. IVO develops a new repair technique for underwater sites

  17. Seismic safety of nuclear power plants in Eastern Europe

    International Nuclear Information System (INIS)

    Gurpinar, A.; Godoy, A.

    1995-01-01

    This paper summarizes the work performed by the International Atomic Energy Agency in the areas of safety reviews and applied research in support of programmes for the assessment and enhancement of seismic safety in WWER type nuclear power plants during the past five years. Three major topics are discussed; engineering safety review services in relation to external events, technical guidelines for the assessment and upgrading of WWER type nuclear power plants, and the Coordinated Research Programme on B enchmark study for the seismic analysis and testing of WWER type nuclear power plants . These topics are summarized in a way to provide an overview of the past and present safety situation in selected WWER type plants which are all located in Eastern European countries. Main conclusion of the paper is that although there is now a thorough understanding of the seismic safety issues in these operating nuclear power plants, the implementation of seismic upgrades to structures, systems and components are lagging behind, particularly for those cases in which the re-evaluation indicated the necessity to strengthen the safety related structures or install new safety systems. (author)

  18. International overview: Good practices at nuclear power plants

    International Nuclear Information System (INIS)

    Calori, F.; Dular, J.

    1992-01-01

    It is reported that to determine and analyze the reasons for differences in an energy availability factors observed at various nuclear power plants (NPP), the IAEA initiated two studies covering a number of plants. The article reviews the key purposes and aims of these two studies, and summarizes their major findings, including the identification of the main factors contributing to the good performance of a NPP. 1 fig., 2 tabs

  19. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2001-01-01

    culture and achieve good performance in terms of safety. This publication identifies the main safety objectives and responsibilities of management with respect to the safe operation of nuclear power plants and associated corporate roles of the operating organization. This Safety Guide discusses the factors to be considered in (a) structuring the operating organization to meet these main safety objectives, (b) setting up management programmes that ensure that the safety tasks are performed, (c) establishing services and facilities that are intended to meet the above requirements and (d) maintaining a strong safety culture within the organization. This Safety Guide primarily addresses safety matters directly related to the operation of nuclear power plants. It assumes that the safety aspects of siting, design, manufacturing and construction have been resolved. It also covers the internal interrelationships between operations and design, construction and commissioning and other organizational units, and deals with the involvement of the operating organization in reviews of safety issues, bearing in mind future operation. Finally, this publication discusses the relationship between the operating organization, the regulatory body and the general public. Section 2 focuses on the operating organization and its structure. Section 3 discusses the functions, responsibilities, goals and objectives of the operating organization that ensure the safe operation of nuclear power plants. Section 4 gives guidance on the interface between the operating organization and external organizations. Section 5 covers safety management aspects. Section 6 provides guidance on the major management programmes that should be established to ensure the safe operation of a nuclear power plant. Section 7 discusses additional services that are needed to support the functioning of plant operation management programmes. Section 8 provides general guidance on the communication and liaison matters that are

  20. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    culture and achieve good performance in terms of safety. This publication identifies the main safety objectives and responsibilities of management with respect to the safe operation of nuclear power plants and associated corporate roles of the operating organization. This Safety Guide discusses the factors to be considered in (a) structuring the operating organization to meet these main safety objectives, (b) setting up management programmes that ensure that the safety tasks are performed, (c) establishing services and facilities that are intended to meet the above requirements and (d) maintaining a strong safety culture within the organization. This Safety Guide primarily addresses safety matters directly related to the operation of nuclear power plants. It assumes that the safety aspects of siting, design, manufacturing and construction have been resolved. It also covers the internal interrelationships between operations and design, construction and commissioning and other organizational units, and deals with the involvement of the operating organization in reviews of safety issues, bearing in mind future operation. Finally, this publication discusses the relationship between the operating organization, the regulatory body and the general public. Section 2 focuses on the operating organization and its structure. Section 3 discusses the functions, responsibilities, goals and objectives of the operating organization that ensure the safe operation of nuclear power plants. Section 4 gives guidance on the interface between the operating organization and external organizations. Section 5 covers safety management aspects. Section 6 provides guidance on the major management programmes that should be established to ensure the safe operation of a nuclear power plant. Section 7 discusses additional services that are needed to support the functioning of plant operation management programmes. Section 8 provides general guidance on the communication and liaison matters that are

  1. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    culture and achieve good performance in terms of safety. This publication identifies the main safety objectives and responsibilities of management with respect to the safe operation of nuclear power plants and associated corporate roles of the operating organization. This Safety Guide discusses the factors to be considered in (a) structuring the operating organization to meet these main safety objectives, (b) setting up management programmes that ensure that the safety tasks are performed, (c) establishing services and facilities that are intended to meet the above requirements and (d) maintaining a strong safety culture within the organization. This Safety Guide primarily addresses safety matters directly related to the operation of nuclear power plants. It assumes that the safety aspects of siting, design, manufacturing and construction have been resolved. It also covers the internal interrelationships between operations and design, construction and commissioning and other organizational units, and deals with the involvement of the operating organization in reviews of safety issues, bearing in mind future operation. Finally, this publication discusses the relationship between the operating organization, the regulatory body and the general public. Section 2 focuses on the operating organization and its structure. Section 3 discusses the functions, responsibilities, goals and objectives of the operating organization that ensure the safe operation of nuclear power plants. Section 4 gives guidance on the interface between the operating organization and external organizations. Section 5 covers safety management aspects. Section 6 provides guidance on the major management programmes that should be established to ensure the safe operation of a nuclear power plant. Section 7 discusses additional services that are needed to support the functioning of plant operation management programmes. Section 8 provides general guidance on the communication and liaison matters that are

  2. Safety-related occurrences at the Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-04-01

    This report contains detailed descriptions of operating incidents and other safety-related matters at the Finnish nuclear power plants regarded as significant by the regulatory authority, the Finnish Centre for Radiation and Nuclear Safety. In this connection, an account is given of the practical actions caused by the incidents, and their significance to reactor safety is evaluated. The main features of the incidents are also described in the general Quartely Report for this period, Operation of Finnish Nuclear Power Plants (STUK-B-YTO 7), which is supplemented by this report intended for experts. (author)

  3. Fault ride-through requirements for onshore wind power plants in Europe: the needs of the power system

    NARCIS (Netherlands)

    Boemer, J.C.; Meer, van der A.A.; Rawn, B.G.; Hendriks, R.L.; Ciupuliga, A.R.; Gibescu, M.; Kling, W.L.; Ferreira, J.A.

    2011-01-01

    Wind power plants show different behavior than conventional (synchronous) generators. As the traditional power systems mainly consisted of centralized generation by synchronous machines feeding passive loads, it was well-understood how the system reacted in normal operation as well as during

  4. Thermodynamic analysis of CO2 capture processes for power plants

    OpenAIRE

    Biyouki, Zeinab Amrollahi

    2014-01-01

    This thesis work presents an evaluation of various processes for reducing CO2 emissions from natural-gas-fired combined cycle (NGCC) power plants. The scope of the thesis is to focus mainly on post-combustion chemical absorption for NGCC. For the post-combustion capture plant, an important interface is the steam extraction from the steam turbine in order to supply the heat for solvent regeneration. The steam extraction imposes a power production penalty. The thesis includes analysis and compa...

  5. An analysis of nuclear power plant operating costs

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the results of a statistical analysis of nonfuel operating costs for nuclear power plants. Most studies of the economic costs of nuclear power have focused on the rapid escalation in the cost of constructing a nuclear power plant. The present analysis found that there has also been substantial escalation in real (inflation-adjusted) nonfuel operating costs. It is important to determine the factors contributing to the escalation in operating costs, not only to understand what has occurred but also to gain insights about future trends in operating costs. There are two types of nonfuel operating costs. The first is routine operating and maintenance expenditures (O and M costs), and the second is large postoperational capital expenditures, or what is typically called ''capital additions.'' O and M costs consist mainly of expenditures on labor, and according to one recently completed study, the majoriy of employees at a nuclear power plant perform maintenance activities. It is generally thought that capital additions costs consist of large maintenance expenditures needed to keep the plants operational, and to make plant modifications (backfits) required by the Nuclear Regulatory Commission (NRC). Many discussions of nuclear power plant operating costs have not considered these capital additions costs, and a major finding of the present study is that these costs are substantial. The objective of this study was to determine why nonfuel operating costs have increased over the past decade. The statistical analysis examined a number of factors that have influenced the escalation in real nonfuel operating costs and these are discussed in this report. 4 figs, 19 tabs

  6. Power plants 2020+. Power plant options for the future and the related demand for research

    International Nuclear Information System (INIS)

    2010-01-01

    This short overview already demonstrates that in the foreseeable future all generation options - nuclear power, fossil-fired power plants and renewable sources of energy - will continue to be applied. If, however, due to climate protection targets, energy conversion processes are to be to switched to CO 2 -free or -low carbon energy sources, comprehensive research endeavours will be required in order to advance existing technology options and to adjust them to changing conditions. This paper is bound to recommend individual fields of research from the viewpoint of the VGB Scientific Advisory Board for the period 2020 and beyond. Firstly, the generation structure in the European high-voltage grid and its development until 2020 will be considered, then the research demand for - Hard coal- and lignite-fired power plants, - Renewables-based electricity generation (wind, solar energy) and - Nuclear-based electricity generation will be outlined briefly, listing the main technology issues to be answered by researchers in order to increase efficiency and to settle any ''loose ends''. Apart from generation technologies, the options for storing electrical energy will also be dealt with. These options can contribute to make the feed-in of renewables-based electricity more permanent and sustainable. (orig.)

  7. Model-based Fuel Flow Control for Fossil-fired Power Plants

    DEFF Research Database (Denmark)

    Niemczyk, Piotr

    2010-01-01

    -fired power plants represent the largest reserve of such controllable power sources in several countries. However, their production take-up rates are limited, mainly due to poor fuel flow control. The thesis presents analysis of difficulties and potential improvements in the control of the coal grinding...

  8. Images of nuclear power plants

    International Nuclear Information System (INIS)

    Hashiguchi, Katsuhisa; Misumi, Jyuji; Yamada, Akira; Sakurai, Yukihiro; Seki, Fumiyasu; Shinohara, Hirofumi; Misumi, Emiko; Kinjou, Akira; Kubo, Tomonori.

    1995-01-01

    This study was conducted to check and see, using Hayashi's quantification method III, whether or not the respondents differed in their images of a nuclear power plant, depending on their demographic variables particularly occupations. In our simple tabulation, we compared subject groups of nuclear power plant employees with general citizens, nurses and students in terms of their images of a nuclear power plant. The results were that while the nuclear power plant employees were high in their evaluations of facts about a nuclear power plant and in their positive images of a nuclear power plant, general citizens, nurses and students were overwhelmingly high in their negative images of a nuclear power plant. In our analysis on category score by means of the quantification method III, the first correlation axis was the dimension of 'safety'-'danger' and the second correlation axis was the dimension of 'subjectivity'-'objectivity', and that the first quadrant was the area of 'safety-subjectivity', the second quadrant was the area of 'danger-subjectivity', the third quadrant as the area of 'danger-objectivity', and the forth quadrant was the area of 'safety-objectivity'. In our analysis of sample score, 16 occupation groups was compared. As a result, it was found that the 16 occupation groups' images of a nuclear power plant were, in the order of favorableness, (1) section chiefs in charge, maintenance subsection chiefs, maintenance foremen, (2) field leaders from subcontractors, (3) maintenance section members, operation section members, (4) employees of those subcontractors, (5) general citizens, nurses and students. On the 'safety-danger' dimension, nuclear power plant workers on the one hand and general citizens, nurses and students on the other were clearly divided in terms of their images of a nuclear power plant. Nuclear power plant workers were concentrated in the area of 'safety' and general citizens, nurses and students in the area of 'danger'. (J.P.N.)

  9. On nuclear power plant uprating

    International Nuclear Information System (INIS)

    Ho, S. Allen; Bailey, James V.; Maginnis, Stephen T.

    2004-01-01

    Power uprating for commercial nuclear power plants has become increasingly attractive because of pragmatic reasons. It provides quick return on investment and competitive financial benefits, while involving low risks regarding plant safety and public objection. This paper briefly discussed nuclear plant uprating guidelines, scope for design basis analysis and engineering evaluation, and presented the Salem nuclear power plant uprating study for illustration purposes. A cost and benefit evaluation of the Salem power uprating was also included. (author)

  10. Module power plant. An isle energy supply; Modulkraftwerk. Eine Inselenergieversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Kolbe, Christian; Luschtinetz, Thomas [Fachhochschule Stralsund (Germany). IRES

    2012-07-01

    The main project intention is the development of an autarkic power plant which can supply energy according to miscellaneous base- or peak load profiles. Possible application could be rural industries, public institutions, research stations or off-grid areas. The basic system is mounted in a shipping container which offers a wide range of transportation flexibility. The main advantage of the system is the intelligent and efficient coupling of the components. Due to the modular character of the components the power plant can be adjusted to specific energy profiles of the user. The system is controlled by a programmable logic controller (PLC) whereby the user can adjust the system by a touch panel. (orig.)

  11. STUDY OF PLANT-WIDE CONTROL IMPLEMENTATION IN PRODUCTION PROCESS OF GEOTHERMAL POWER PLANT

    Directory of Open Access Journals (Sweden)

    KATHERIN INDRIAWATI

    2017-02-01

    Full Text Available The design of plant-wide control system to optimize electricity production in geothermal power plant is proposed in this research. The objective is to overcome the deficiency due to changes in the characteristics of production well and fluctuation in electricity demand load. The proposed plant-wide control system has two main tasks; to maintain production process at optimum value and to increase efficiency. The pressure in separator and condenser is maintained at the respective set points under electrical load fluctuations in order to ensure optimum efficiency. The control system also reduce the usage of auxialiary electrical power and increase efficiency. The task was performed by controlling inlet cooling water temperatures to the condenser. It was concluded that the proposed control structure was able to increase efficiency and maintain production.

  12. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  13. The Kuroshio power plant

    CERN Document Server

    Chen, Falin

    2013-01-01

    By outlining a new design or the Kuroshio power plant, new approaches to turbine design, anchorage system planning, deep sea marine engineering and power plant operations and maintenance are explored and suggested. The impact on the local environment, particularly in the face of natural disasters, is also considered to provide a well rounded introduction to plan and build a 30MW pilot power plant. Following a literature review, the six chapters of this book propose a conceptual design by focusing on the plant's core technologies and establish the separate analysis logics for turbine design and

  14. A survey of the underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Pinto, S.

    1979-12-01

    The idea of locating nuclear power plants underground is not new, since in the period of time between the late fifties and the early sixties, four small nuclear plants have been built in Europe in rock cavities. Safety has been, in general, the main motivation for such a siting solution. In the last years several factors such as increasing power transmission costs, decreasing number of suitable sites above ground, increased difficulties in obtaining site approval by the licensing authorities, increasing opposition to nuclear power, increasing concern for extreme - but highly improbable - accidents, together with the possibility of utilizing the waste heat and the urban siting concept have renewed the interest for the underground siting as an alternative to surface siting. The author presents a survey of the main studies carried out on the subject of underground siting. (Auth.)

  15. Determination of the probability of an aircraft falling on a nuclear power plant

    International Nuclear Information System (INIS)

    Kostikov, V.A.; Smol'nikov, V.L.; Baranaev, Yu.D.; Viktorov, A.N.; Vladykov, G.M.; Dolgov, V.V.; Shvedenko, I.M.

    1993-01-01

    Significant possible external actions at nuclear power plants are events associated with aviation accidents, in which, for one reason or another, an airplane or a fragment of an airplane can fall on the building and destroy the reactor or important safety systems. Measures for preventing an aircraft from striking a nuclear power plant include flight limitations and siting of airports, and flight corridors are created near nuclear power plants. The reactor itself can be placed in a special strong protective envelope. The specific technical measures are determined, to a significant degree, by the type of accident and the type of aircraft. It is now acknowledged, including in documents published by the IAEA, that assessment of the adequacy of measures for protecting a nuclear power plant from aircraft is most efficiently done by means of a probability analysis. We expound below briefly the methodology and the results obtained by its application to the South Ural nuclear power plant and the Bilibinskaya nuclear heat and electricity station. Falling of an aircraft (jet or helicopter) on a nuclear power plant is an extreme event, whose probability is determined mainly by flight safety measures, the intensity of flights in the region, and the distribution of aviation accidents by type and characteristic consequences. Flight safety is determined by the frequency with which aviation accidents occur per hour of flight and mainly depends on the sophistication of the aviation technology. The intensity of flights near a nuclear power plant is estimated taking into account the administrative and organizational measures for limiting flights and is a characteristic of the region where the power plant is located, as is the distribution of aviation accidents by type

  16. Using of wireless communication in nuclear power plants

    International Nuclear Information System (INIS)

    Ku, C. S.; Kim, B. Y.; Jeong, C. H.; Lee, K. B.; Song, T. S.

    2001-01-01

    The using of wireless communication in nuclear power plants have been limited due to the mis-operation of the safety related instrumentation and control system. If some obstacles such as electromagnetic interference are solved, the using of wireless communication in nuclear power plants recommended because of lots of benefit. In this paper, we measured the electric field intensity for the operation of a potable transceiver in the area of the PPS, PCS, CPC and main control room and provided the electric field intensity limits that a portable transceiver can be used safely near by the safety related systems without electromagnetic interference to the safety related equipment

  17. New situation and future of nuclear power plants

    International Nuclear Information System (INIS)

    Castejon, F.

    2008-01-01

    The situation of the nuclear power plants in the World is commented, making emphasis on the Spanish case. It is also pointed the difficulty of the nuclear industry to overcome the main caveats of this energy source: To guarantee the safety of the reactors, the management of the high radioactive level waste, and high investments necessary to build a nuclear power plant. These caveats have made that the public opinion is against the nuclear energy in Europe, and especially in Spain. It is difficult that a re launching of nuclear energy without the economical support of the governments, which guarantees the return of the investments. (Author) 7 refs

  18. Safety requirements for a nuclear power plant electric power system

    Energy Technology Data Exchange (ETDEWEB)

    Fouad, L F; Shinaishin, M A

    1988-06-15

    This work aims at identifying the safety requirements for the electric power system in a typical nuclear power plant, in view of the UNSRC and the IAEA. Description of a typical system is provided, followed by a presentation of the scope of the information required for safety evaluation of the system design and performance. The acceptance and design criteria that must be met as being specified by both regulatory systems, are compared. Means of implementation of such criteria as being described in the USNRC regulatory guides and branch technical positions on one hand and in the IAEA safety guides on the other hand are investigated. It is concluded that the IAEA regulations address the problems that may be faced with in countries having varying grid sizes ranging from large stable to small potentially unstable ones; and that they put emphasis on the onsite standby power supply. Also, in this respect the Americans identify the grid as the preferred power supply to the plant auxiliaries, while the IAEA leaves the possibility that the preferred power supply could be either the grid or the unit main generator depending on the reliability of each. Therefore, it is found that it is particularly necessary in this area of electric power supplies to deal with the IAEA and the American sets of regulations as if each complements and not supplements the other. (author)

  19. Provision of enhanced ancillary services from wind power plants - Examples and challenges

    DEFF Research Database (Denmark)

    Hansen, Anca Daniela; Altin, Müfit; Iov, Florin

    2016-01-01

    Emphasis in this article is on the power system impact of wind power plants capability to provide enhanced ancillary services, i.e. temporary frequency response (TFR) and power oscillation damping (POD). The main objective of the article is to analyze and justify the challenges in the use of TFR...... and POD from wind power plants (WPPs). The study is conducted with an aggregated wind power plant model which is integrated into a generic power system model, specifically designed to assess the targeted ancillary services in a relatively simple, but still relevant environment. Various case studies...... with different wind power penetration levels are considered. The study shows that WPPs can provide additional control features such as TFR and POD to enhance the stability of power systems with large share of wind power. Nevertheless, the results illustrate that the power system stability can be potentially...

  20. Analysis of loss of offsite power events reported in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Volkanovski, Andrija, E-mail: Andrija.VOLKANOVSKI@ec.europa.eu [European Commission, Joint Research Centre, Institute for Energy and Transport, P.O. Box 2, NL-1755 ZG Petten (Netherlands); Ballesteros Avila, Antonio; Peinador Veira, Miguel [European Commission, Joint Research Centre, Institute for Energy and Transport, P.O. Box 2, NL-1755 ZG Petten (Netherlands); Kančev, Duško [Kernkraftwerk Goesgen-Daeniken AG, CH-4658 Daeniken (Switzerland); Maqua, Michael [Gesellschaft für Anlagen-und-Reaktorsicherheit (GRS) gGmbH, Schwertnergasse 1, 50667 Köln (Germany); Stephan, Jean-Luc [Institut de Radioprotection et de Sûreté Nucléaire (IRSN), BP 17 – 92262 Fontenay-aux-Roses Cedex (France)

    2016-10-15

    Highlights: • Loss of offsite power events were identified in four databases. • Engineering analysis of relevant events was done. • The dominant root cause for LOOP are human failures. • Improved maintenance procedures can decrease the number of LOOP events. - Abstract: This paper presents the results of analysis of the loss of offsite power events (LOOP) in four databases of operational events. The screened databases include: the Gesellschaft für Anlagen und Reaktorsicherheit mbH (GRS) and Institut de Radioprotection et de Sûreté Nucléaire (IRSN) databases, the IAEA International Reporting System for Operating Experience (IRS) and the U.S. Licensee Event Reports (LER). In total 228 relevant loss of offsite power events were identified in the IRSN database, 190 in the GRS database, 120 in U.S. LER and 52 in IRS database. Identified events were classified in predefined categories. Obtained results show that the largest percentage of LOOP events is registered during On power operational mode and lasted for two minutes or more. The plant centered events is the main contributor to LOOP events identified in IRSN, GRS and IAEA IRS database. The switchyard centered events are the main contributor in events registered in the NRC LER database. The main type of failed equipment is switchyard failures in IRSN and IAEA IRS, main or secondary lines in NRC LER and busbar failures in GRS database. The dominant root cause for the LOOP events are human failures during test, inspection and maintenance followed by human failures due to the insufficient or wrong procedures. The largest number of LOOP events resulted in reactor trip followed by EDG start. The actions that can result in reduction of the number of LOOP events and minimize consequences on plant safety are identified and presented.

  1. Nuclear power plant design characteristics. Structure of nuclear power plant design characteristics in the IAEA Power Reactor Information System (PRIS)

    International Nuclear Information System (INIS)

    2007-03-01

    One of the IAEA's priorities has been to maintain the Power Reactor Information System (PRIS) database as a viable and useful source of information on nuclear reactors worldwide. To satisfy the needs of PRIS users as much as possible, the PRIS database has included also a set of nuclear power plant (NPP) design characteristics. Accordingly, the PRIS Technical Meeting, organized in Vienna 4-7 October 2004, initiated a thorough revision of the design data area of the PRIS database to establish the actual status of the data and make improvements. The revision first concentrated on a detailed review of the design data completion and the composition of the design characteristics. Based on the results of the review, a modified set and structure of the unit design characteristics for the PRIS database has been developed. The main objective of the development has been to cover all significant plant systems adequately and provide an even more comprehensive overview of NPP unit designs stored in the PRIS database

  2. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  3. Hybrid biomass-wind power plant for reliable energy generation

    International Nuclear Information System (INIS)

    Perez-Navarro, A.; Alfonso, D.; Alvarez, C.; Ibanez, F.; Sanchez, C.; Segura, I.

    2010-01-01

    Massive implementation of renewable energy resources is a key element to reduce CO 2 emissions associated to electricity generation. Wind resources can provide an important alternative to conventional electricity generation mainly based on fossil fuels. However, wind generators are greatly affected by the restrictive operating rules of electricity markets because, as wind is naturally variable, wind generators may have serious difficulties on submitting accurate generation schedules on a day ahead basis, and on complying with scheduled obligations in real-time operation. In this paper, an innovative system combining a biomass gasification power plant, a gas storage system and stand-by generators to stabilize a generic 40 MW wind park is proposed and evaluated with real data. The wind park power production model is based on real data about power production of a Spanish wind park and a probabilistic approach to quantify fluctuations and so, power compensation needs. The hybrid wind-biomass system is analysed to obtain main hybrid system design parameters. This hybrid system can mitigate wind prediction errors and so provide a predictable source of electricity. An entire year cycle of hourly power compensations needs has been simulated deducing storage capacity, extra power needs of the biomass power plant and stand-by generation capacity to assure power compensation during critical peak hours with acceptable reliability. (author)

  4. Safety evaluation of nuclear power plant against the virtual tsunami

    International Nuclear Information System (INIS)

    Chin, S. B.; Imamura, Fumihiko

    2004-01-01

    The main scope of this study is the numerical analysis of virtual tsunami event near the Ulchin Nuclear Power Plants. In the numerical analysis, the maximum run-up height and draw-down are estimated at the Ulchin Nuclear Power Plants. The computer program developed in this study describes the propagation and associated run-up process of tsunamis by solving linear and nonlinear shallow-water equations with finite difference methods. It can be used to check the safety of a nuclear power plant against tsunami attacks. The program can also be used to calculate run-up height of wave and provide proper design criteria for coastal facilities and structures. A maximum inundation zone along the coastline can be developed by using the moving boundary condition. As a result, it is predicted that the Ulchin Nuclear Power Plants might be safe against the virtual tsunami event. Although the Ulchin Nuclear Power Plants are safe against the virtual tsunami event, the occurrence of a huge tsunami in the seismic gap should be investigated in detail. Furthermore, the possibility of nearshore tsunamis around the Korean Peninsula should also be studied and monitored continuously

  5. Safety classification of items in Tianwan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Sun Yongbin

    2005-01-01

    The principle of integrality, moderation and equilibrium should be considered in the safety classification of items in nuclear power plant. The basic ways for safety classification of items is to classify the safety function based on the effect of the outside enclosure damage of the items (parts) on the safety. Tianwan Nuclear Power Plant adopts Russian VVER-1000/428 type reactor, it safety classification mainly refers to Russian Guidelines and standards. The safety classification of the electric equipment refers to IEEE-308(80) standard, including 1E and Non 1E classification. The safety classification of the instrumentation and control equipment refers to GB/T 15474-1995 standard, including safety 1E, safety-related SR and NC non-safety classification. The safety classification of Tianwan Nuclear Power Plant has to be approved by NNSA and satisfy Chinese Nuclear Safety Guidelines. (authors)

  6. Dynamic testing of nuclear power plant structures: an evaluation

    International Nuclear Information System (INIS)

    Weaver, H.J.

    1980-02-01

    Lawrence Livermore Laboratory (LLL) evaluated the applications of system identification techniques to the dynamic testing of nuclear power plant structures and subsystems. These experimental techniques involve exciting a structure and measuring, digitizing, and processing the time-history motions that result. The data can be compared to parameters calculated using finite element or other models of the test systems to validate the model and to verify the seismic analysis. This report summarizes work in three main areas: (1) analytical qualification of a set of computer programs developed at LLL to extract model parameters from the time histories; (2) examination of the feasibility of safely exciting nuclear power plant structures and accurately recording the resulting time-history motions; (3) study of how the model parameters that are extracted from the data be used best to evaluate structural integrity and analyze nuclear power plants

  7. Program change management during nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Bushart, Sean; Kim, Karen; Naughton, Michael

    2011-01-01

    Decommissioning a nuclear power plant is a complex project. The project involves the coordination of several different departments and the management of changing plant conditions, programs, and regulations. As certain project Milestones are met, the evolution of such plant programs and regulations can help optimize project execution and cost. This paper will provide information about these Milestones and the plant departments and programs that change throughout a decommissioning project. The initial challenge in the decommissioning of a nuclear plant is the development of a definitive plan for such a complex project. EPRI has published several reports related to decommissioning planning. These earlier reports provided general guidance in formulating a Decommissioning Plan. This Change Management paper will draw from the experience gained in the last decade in decommissioning of nuclear plants. The paper discusses decommissioning in terms of a sequence of major Milestones. The plant programs, associated plans and actions, and staffing are discussed based upon experiences from the following power reactor facilities: Maine Yankee Atomic Power Plant, Yankee Nuclear Power Station, and the Haddam Neck Plant. Significant lessons learned from other sites are also discussed as appropriate. Planning is a crucial ingredient of successful decommissioning projects. The development of a definitive Decommissioning Plan can result in considerable project savings. The decommissioning plants in the U.S. have planned and executed their projects using different strategies based on their unique plant circumstances. However, experience has shown that similar project milestones and actions applied through all of these projects. This allows each plant to learn from the experiences of the preceding projects. As the plant transitions from an operating plant through decommissioning, the reduction and termination of defunct programs and regulations can help optimize all facets of

  8. PWR reactors for BBR nuclear power plants

    International Nuclear Information System (INIS)

    Structure and functioning of the nuclear steam generator system developed by BBR and its components are described. Auxiliary systems, control and load following behaviour and fuel management are discussed and the main data of PWR given. The brochure closes with a perspective of the future of the Muelheim-Kaerlich nuclear power plant. (GL) [de

  9. Nuclear power plant reliability database management

    International Nuclear Information System (INIS)

    Meslin, Th.; Aufort, P.

    1996-04-01

    In the framework of the development of a probabilistic safety project on site (notion of living PSA), Saint Laurent des Eaux NPP implements a specific EDF reliability database. The main goals of this project at Saint Laurent des Eaux are: to expand risk analysis and to constitute an effective local basis of thinking about operating safety by requiring the participation of all departments of a power plant: analysis of all potential operating transients, unavailability consequences... that means to go further than a simple culture of applying operating rules; to involve nuclear power plant operators in experience feedback and its analysis, especially by following up behaviour of components and of safety functions; to allow plant safety managers to outline their decisions facing safety authorities for notwithstanding, preventive maintenance programme, operating incident evaluation. To hit these goals requires feedback data, tools, techniques and development of skills. The first step is to obtain specific reliability data on the site. Raw data come from plant maintenance management system which processes all maintenance activities and keeps in memory all the records of component failures and maintenance activities. Plant specific reliability data are estimated with a Bayesian model which combines these validated raw data with corporate generic data. This approach allow to provide reliability data for main components modelled in PSA, to check the consistency of the maintenance program (RCM), to verify hypothesis made at the design about component reliability. A number of studies, related to components reliability as well as decision making process of specific incident risk evaluation have been carried out. This paper provides also an overview of the process management set up on site from raw database to specific reliability database in compliance with established corporate objectives. (authors). 4 figs

  10. Nuclear power plant reliability database management

    Energy Technology Data Exchange (ETDEWEB)

    Meslin, Th [Electricite de France (EDF), 41 - Saint-Laurent-des-Eaux (France); Aufort, P

    1996-04-01

    In the framework of the development of a probabilistic safety project on site (notion of living PSA), Saint Laurent des Eaux NPP implements a specific EDF reliability database. The main goals of this project at Saint Laurent des Eaux are: to expand risk analysis and to constitute an effective local basis of thinking about operating safety by requiring the participation of all departments of a power plant: analysis of all potential operating transients, unavailability consequences... that means to go further than a simple culture of applying operating rules; to involve nuclear power plant operators in experience feedback and its analysis, especially by following up behaviour of components and of safety functions; to allow plant safety managers to outline their decisions facing safety authorities for notwithstanding, preventive maintenance programme, operating incident evaluation. To hit these goals requires feedback data, tools, techniques and development of skills. The first step is to obtain specific reliability data on the site. Raw data come from plant maintenance management system which processes all maintenance activities and keeps in memory all the records of component failures and maintenance activities. Plant specific reliability data are estimated with a Bayesian model which combines these validated raw data with corporate generic data. This approach allow to provide reliability data for main components modelled in PSA, to check the consistency of the maintenance program (RCM), to verify hypothesis made at the design about component reliability. A number of studies, related to components reliability as well as decision making process of specific incident risk evaluation have been carried out. This paper provides also an overview of the process management set up on site from raw database to specific reliability database in compliance with established corporate objectives. (authors). 4 figs.

  11. Study of the Radiological Impact of the Coal Fired Power Plants on the Environment. The As Pontes coal-fired Power Plant

    International Nuclear Information System (INIS)

    Cancio, D.; Robles, B.; Mora, J. C.

    2009-01-01

    As part of the Study carried out to determine the radiological impact of the four main Spanish coal-fired power plants, the Study on the As Pontes Coal-Fired Coal Power Plant was finalized. In the Report containing the study are included every measurement performed, as well as the modelling and evaluations carried out in order to assess the radiological impact. The general conclusion obtained is that under a radiological point of view, the impact of this installation on the public and the environment is very small. Also the radiological impact on the workers of the installation was assessed, obtaining too very small increases over the natural background. (Author) 61 refs.

  12. Low Power Shutdown PSA for CANDU Type Plants

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Yeon Kyoung; Kim, Myung Su [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    KHNP also have concentrated on full power PSA. Some recently constructed OPR1000 type plants and APR1400 type plants have performed the low power and shutdown (LPSD) PSA. The purpose of LPSD PSA is to identify the main contributors on the accident sequences of core damage and to find the measure of safety improvement. After the Fukushima accident, Korean regulatory agency required the shutdown severe accident management guidelines (SSAMG) development for safety enhancement. For the reliability of SSAMG, KHNP should develop the LPSD PSA. Especially, the LPSD PSA for CANDU type plant had developed for the first time in Korea. This paper illustrates how the LPSD PSA for CANDU type developed and the core damage frequency (CDF) is different with that of full power PSA. KHNP performed LPSD PSA to develop the SSAMG after the Fukushima accidents. The results show that risk at the specific operation mode during outage is higher than that of full power operation. Also, the results indicated that recovery failure of class 4 power at the POS 5A, 5B contribute dominantly to the total CDF from importances analysis. LPSD PSA results such as CDF with initiating events and POSs, risk results with plant damage state, and containment failure probability and frequency with POSs can be used by inputs for developing the SSAMG.

  13. Designing a nuclear power plant with 1000 MW WWER-type units

    Energy Technology Data Exchange (ETDEWEB)

    Berkovich, V; Kaloshin, J; Tatarnikov, V; Shenderovich, A

    1977-06-01

    A brief description is presented of a WWER-1000 nuclear power plant also considering its environmental impact and the problem of core poisoning. The following indicators are graphically shown in relation to the reactor output: turbogenerator unit outputs, efficiency, specific capital costs and own costs of electric power generated by the Voronezh nuclear power plant. Also listed are the specific consumption of metal and concrete, specific equipment weight and the specific volume of the buildings of the main generating unit as well as the cross section thereof.

  14. Evaluation of Hybrid Power Plants using Biomass, Photovoltaics and Steam Electrolysis for Hydrogen and Power Generation

    Science.gov (United States)

    Petrakopoulou, F.; Sanz, J.

    2014-12-01

    Steam electrolysis is a promising process of large-scale centralized hydrogen production, while it is also considered an excellent option for the efficient use of renewable solar and geothermal energy resources. This work studies the operation of an intermediate temperature steam electrolyzer (ITSE) and its incorporation into hybrid power plants that include biomass combustion and photovoltaic panels (PV). The plants generate both electricity and hydrogen. The reference -biomass- power plant and four variations of a hybrid biomass-PV incorporating the reference biomass plant and the ITSE are simulated and evaluated using exergetic analysis. The variations of the hybrid power plants are associated with (1) the air recirculation from the electrolyzer to the biomass power plant, (2) the elimination of the sweep gas of the electrolyzer, (3) the replacement of two electric heaters with gas/gas heat exchangers, and (4) the replacement two heat exchangers of the reference electrolyzer unit with one heat exchanger that uses steam from the biomass power plant. In all cases, 60% of the electricity required in the electrolyzer is covered by the biomass plant and 40% by the photovoltaic panels. When comparing the hybrid plants with the reference biomass power plant that has identical operation and structure as that incorporated in the hybrid plants, we observe an efficiency decrease that varies depending on the scenario. The efficiency decrease stems mainly from the low effectiveness of the photovoltaic panels (14.4%). When comparing the hybrid scenarios, we see that the elimination of the sweep gas decreases the power consumption due to the elimination of the compressor used to cover the pressure losses of the filter, the heat exchangers and the electrolyzer. Nevertheless, if the sweep gas is used to preheat the air entering the boiler of the biomass power plant, the efficiency of the plant increases. When replacing the electric heaters with gas-gas heat exchangers, the

  15. Chemistry Optimitation of a PWR nuclear power plant

    International Nuclear Information System (INIS)

    Frandrich, J.; Ramminger, U.

    2015-01-01

    One of the main objectives for the plant operator of a Nuclear Power Plant is to protect the Steam Generators (SG) during the lifetime of the plant by ensuring a safe and reliable operation. The SGs serve as an important barrier to prevent the spread of contamination out of the primary circuit. One the other hand impurities are accumulated within the SGs leading to extreme chemical and physical conditions. The application of an optimized water chemistry treatment of the secondary side is essential to ensure a good performance of the steam generators. (Author)

  16. Plant life management optimized utilization of existing nuclear power plants

    International Nuclear Information System (INIS)

    Watzinger, H.; Erve, M.

    1999-01-01

    For safe, reliable and economical nuclear power generation it is of central importance to understand, analyze and manage aging-related phenomena and to apply this information in the systematic utilization and as-necessary extension of the service life of components and systems. An operator's overall approach to aging and plant life management which also improves performance characteristics can help to optimize plant operating economy. In view of the deregulation of the power generation industry with its increased competition, nuclear power plants must today also increasingly provide for or maintain a high level of plant availability and low power generating costs. This is a difficult challenge even for the newest, most modern plants, and as plants age they can only remain competitive if a plant operator adopts a strategic approach which takes into account the various aging-related effects on a plant-wide basis. The significance of aging and plant life management for nuclear power plants becomes apparent when looking at their age: By the year 2000 roughly fifty of the world's 434 commercial nuclear power plants will have been in operation for thirty years or more. According to the International Atomic Energy Agency, as many as 110 plants will have reached the thirty-year service mark by the year 2005. In many countries human society does not push the construction of new nuclear power plants and presumably will not change mind within the next ten years. New construction licenses cannot be expected so that for economical and ecological reasons existing plants have to be operated unchallengeably. On the other hand the deregulation of the power production market is asking just now for analysis of plant life time to operate the plants at a high technical and economical level until new nuclear power plants can be licensed and constructed. (author)

  17. Migration of Older to New Digital Control Systems in Nuclear Power Plant Main Control Rooms

    Energy Technology Data Exchange (ETDEWEB)

    Kovesdi, Casey Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey Clark [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-04-01

    The United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) has the primary mission to advance nuclear power by resolving socio-technical issues through research and development (R&D). One DOE-NE activity supporting this mission is the Light Water Reactor Sustainability (LWRS) program. LWRS has the overall objective to sustain the operation of existing commercial nuclear power plants (NPPs) through conducting R&D across multiple “pathways,” or R&D focus areas. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in operating U.S. NPPs. This work involves (1) ensuring that legacy analog II&C systems are not life-limiting issues for the LWR fleet, and (2) implementing digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Under the LWRS Advanced II&C pathway, Human Factors experts at Idaho National Laboratory (INL) have been conducting R&D in support of NPP main control room (MCR) modernization activities. Work in prior years has focused on migrating analog I&C systems to new digital I&C systems (). In fiscal year 2016 (FY16), one new focus area for this research is migrating older digital I&C systems to new and advanced digital I&C systems. This report summarizes a plan for conducting a digital-to-digital migration of a legacy digital I&C system to a new digital I&C system in support of control room modernization activities.

  18. Migration of Older to New Digital Control Systems in Nuclear Power Plant Main Control Rooms

    International Nuclear Information System (INIS)

    Kovesdi, Casey Robert; Joe, Jeffrey Clark

    2016-01-01

    The United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) has the primary mission to advance nuclear power by resolving socio-technical issues through research and development (R&D). One DOE-NE activity supporting this mission is the Light Water Reactor Sustainability (LWRS) program. LWRS has the overall objective to sustain the operation of existing commercial nuclear power plants (NPPs) through conducting R&D across multiple ''pathways,'' or R&D focus areas. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in operating U.S. NPPs. This work involves (1) ensuring that legacy analog II&C systems are not life-limiting issues for the LWR fleet, and (2) implementing digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Under the LWRS Advanced II&C pathway, Human Factors experts at Idaho National Laboratory (INL) have been conducting R&D in support of NPP main control room (MCR) modernization activities. Work in prior years has focused on migrating analog I&C systems to new digital I&C systems (). In fiscal year 2016 (FY16), one new focus area for this research is migrating older digital I&C systems to new and advanced digital I&C systems. This report summarizes a plan for conducting a digital-to-digital migration of a legacy digital I&C system to a new digital I&C system in support of control room modernization activities.

  19. Some power uprate issues in nuclear power plants

    International Nuclear Information System (INIS)

    Tipping, Philip

    2008-01-01

    Issues and themes concerned with nuclear power plant uprating are examined. Attention is brought to the fact that many candidate nuclear power plants for uprating have anyway been operated below their rated power for a significant part of their operating life. The key issues remain safety and reliability in operation at all times, irrespective of the nuclear power plant's chronological or design age or power rating. The effects of power uprates are discussed in terms of material aspects and expected demands on the systems, structures and components. The impact on operation and maintenance methods is indicated in terms of changes to the ageing surveillance programmes. Attention is brought to the necessity checking or revising operator actions after power up-rating has been implemented

  20. Cyber security assessment of a power plant

    Energy Technology Data Exchange (ETDEWEB)

    Nai Fovino, Igor; Masera, Marcelo; Stefanini, Alberto [Joint Research Centre, Institute for the Protection and Security of the Citizen, Ispra (Italy); Guidi, Luca [Enel Ingegneria e Innovazione, Pisa (Italy)

    2011-02-15

    Critical infrastructures and systems are today exposed not only to traditional safety and availability problems, but also to new kinds of security threats. These are mainly due to the large number of new vulnerabilities and architectural weaknesses introduced by the extensive use of information and communication technologies (ICT) into such complex systems. In this paper we present the outcomes of an exhaustive ICT security assessment, targeting an operational power plant, which consisted also of the simulation of potential cyber attacks. The assessment shows that the plant is considerably vulnerable to malicious attacks. This situation cannot be ignored, because the potential outcomes of an induced plant malfunction can be severe. (author)

  1. IAEA activity on operator support systems in nuclear power plants

    International Nuclear Information System (INIS)

    Dounaev, V.; Fujita, Y.; Juslin, K.; Haugset, K.; Lux, I.; Naser, J.

    1994-01-01

    Various operator support systems for nuclear power plants are already operational or under development in the IAEA Member States. Operator support systems are based on intelligent data processing and, in addition to plant operation, they are also becoming more important for safety. A key feature of operator support systems is their availability to restructure data to increase its relevance for a given situation. This can improve the user's ability to identify plant mode, system state, and component state and to identify and diagnose faults. Operator support systems can also assist the user in planning and implementing corrective actions to improve the nuclear power plant's availability and safety. In September 1991, the IAEA Committee for Contractual Scientific Services approved the Co-ordinated Research Programme (CRP) on ''Operator Support Systems in Nuclear Power Plants'' in the framework of the Project ''Man-Machine Interface Studies''. The main objective of this programme is to provide guidance and technology transfer for the development and implementation of operator support systems. This includes the experience with human-machine interfaces and closely related issues such as instrumentation and control, the use of computers in nuclear power plants, and operator qualification. (author)

  2. Offshore atomic power plants

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Various merits of offshore atomic power plants are illustrated, and their systems are assessed. The planning of the offshore atomic power plants in USA is reviewed, and the construction costs of the offshore plant in Japan were estimated. Air pollution problem may be solved by the offshore atomic power plants remarkably. Deep water at low temperature may be advantageously used as cooling water for condensers. Marine resources may be bred by building artificial habitats and by providing spring-up equipments. In the case of floating plants, the plant design can be standardized so that the construction costs may be reduced. The offshore plants can be classified into three systems, namely artificial island system, floating system and sea bottom-based system. The island system may be realized with the present level of civil engineering, but requires the development of technology for the resistance of base against earthquake and its calculation means. The floating system may be constructed with conventional power plant engineering and shipbuilding engineering, but the aseismatic stability of breakwater may be a problem to be solved. Deep water floating system and deep water submerging system are conceivable, but its realization may be difficult. The sea bottom-based system with large caissons can be realized by the present civil engineering, but the construction of the caissons, stability against earthquake and resistance to waves may be problems to be solved. The technical prediction and assessment of new plant sites for nuclear power plants have been reported by Science and Technology Agency in 1974. The construction costs of an offshore plant has been estimated by the Ministry of International Trade and Industry to be yen71,026/kW as of 1985. (Iwakiri, K.)

  3. Nuclear power plant disasters

    International Nuclear Information System (INIS)

    Trott, K.R.

    1979-01-01

    The possibility of a nuclear power plant disaster is small but not excluded: in its event, assistance to the affected population mainly depends on local practitioners. Already existing diseases have to be diagnosed and treated; moreover, these physicians are responsible for the early detection of those individuals exposed to radiation doses high enough to induce acute illness. Here we present the pathogenesis, clinical development and possible diagnostic and therapeutical problems related to acute radiation-induced diseases. The differentiation of persons according to therapy need and prognosis is done on the sole base of the clinical evidence and the peripheral blood count. (orig.) [de

  4. Model-Based Power Plant Master Control

    Energy Technology Data Exchange (ETDEWEB)

    Boman, Katarina; Thomas, Jean; Funkquist, Jonas

    2010-08-15

    The main goal of the project has been to evaluate the potential of a coordinated master control for a solid fuel power plant in terms of tracking capability, stability and robustness. The control strategy has been model-based predictive control (MPC) and the plant used in the case study has been the Vattenfall power plant Idbaecken in Nykoeping. A dynamic plant model based on nonlinear physical models was used to imitate the true plant in MATLAB/SIMULINK simulations. The basis for this model was already developed in previous Vattenfall internal projects, along with a simulation model of the existing control implementation with traditional PID controllers. The existing PID control is used as a reference performance, and it has been thoroughly studied and tuned in these previous Vattenfall internal projects. A turbine model was developed with characteristics based on the results of steady-state simulations of the plant using the software EBSILON. Using the derived model as a representative for the actual process, an MPC control strategy was developed using linearization and gain-scheduling. The control signal constraints (rate of change) and constraints on outputs were implemented to comply with plant constraints. After tuning the MPC control parameters, a number of simulation scenarios were performed to compare the MPC strategy with the existing PID control structure. The simulation scenarios also included cases highlighting the robustness properties of the MPC strategy. From the study, the main conclusions are: - The proposed Master MPC controller shows excellent set-point tracking performance even though the plant has strong interactions and non-linearity, and the controls and their rate of change are bounded. - The proposed Master MPC controller is robust, stable in the presence of disturbances and parameter variations. Even though the current study only considered a very small number of the possible disturbances and modelling errors, the considered cases are

  5. System analysis and mass balance of a caloric power plant

    International Nuclear Information System (INIS)

    Schachermayer, E.; Rechberger, H.; Brunner, P.H.; Maderner, W.

    1995-05-01

    The present feasibility study analyses the possibilities of examining and presenting material and energy aspects of the interaction between the power plant and the region. A method has been worked out to establish an overall system called power plant and its periphery which combines the thermal power plant Voitsberg 3, the supplying coal mine Oberdorf, and the ash dumping site Karlschacht 2. One goal of this study was therefore, to find a way of combining the different steps 'mining' , 'power plant' , and 'ash dumping' to an overall system considering both qualitative and quantitative aspects. Another goal of the present feasibility study was to develop methods to consider the impacts of the power plant and its periphery to the environment and the use of resources. For this purpose the region is analysed from two different points of view: - the region defined by the 'product'; its size is defined by the number of inhabitants the power plant supplies with the product 'electricity'. The region defined by the area, in which the specific impacts of the power plant on air, water, soil etc. have to be examined; its size will therefore vary considerably according to the subject of investigation. Based on data provided by the power plant operators a rough estimate could be made to what extent the power plant is responsible for the air pollutant emissions in the region defined by the 'product'. According to these data the part of pollution caused by the power plant amounts to 10% for NOx and particulate matter, to 40% for SO 2 , and to 70% for CO 2 . Furthermore, it can be seen, that the material fluxes of selenium and mercury have to be surveyed in more detail. The ashes dumped in Karlschacht 2 contain a large amount of heavy metals, mainly arsenic, selenium, and mercury. These elements occur in a much higher concentration than in the earth crust. (author)

  6. Fusion power plant studies in Europe

    International Nuclear Information System (INIS)

    Maisonnier, D.

    2007-01-01

    The European fusion programme is reactor oriented and it is aimed at the successive demonstration of the scientific, the technological and the economic feasibility of fusion power. For a reactor-oriented fusion development programme, it is essential to have a clear idea of the ultimate goal of the programme, namely a series of models of fusion power plants, in order to define the correct strategy and to assess the pertinence of the on-going activities. The European Power Plant Conceptual Study (PPCS) has been a study of conceptual designs for commercial fusion power plants. It focused on five power plant models, named PPCS A, B, AB, C and D, which are illustrative of a wider spectrum of possibilities. They are all based on the tokamak concept and they have approximately the same net electrical power output, 1500 MWe. These span a range from relatively near-term, based on limited technology and plasma physics extrapolations, to an advanced conception. All five PPCS plant models differ substantially from the models that formed the basis of earlier European studies. They also differ from one another, which lead to differences in economic performance and in the details of safety and environmental impacts. The main emphasis of the PPCS was on system integration. Systems analyses were used to produce self-consistent plant parameter sets with approximately optimal economic characteristics for all models. In the PPCS models, the favourable, inherent, features of fusion have been exploited to provide substantial safety and environmental advantages. The broad features of the safety and environmental conclusions of previous studies have been confirmed and demonstrated with increased confidence. The PPCS study highlighted the need for specific design and R and D activities, in addition to those already underway within the European long term R and D programme, as well as the need to clarify the concept of DEMO, the device that will bridge the gap between ITER and the first

  7. Hybrid combined cycle power plant

    International Nuclear Information System (INIS)

    Veszely, K.

    2002-01-01

    In case of re-powering the existing pressurised water nuclear power plants by the proposed HCCPP solution, we can increase the electricity output and efficiency significantly. If we convert a traditional nuclear power plant unit to a HCCPP solution, we can achieve a 3.2-5.5 times increase in electricity output and the achievable gross efficiency falls between 46.8-52% and above, depending on the applied solution. These figures emphasise that we should rethink our power plant technologies and we have to explore a great variety of HCCPP solutions. This may give a new direction in the development of nuclear reactors and power plants as well.(author)

  8. Development of nuclear power plant diagnosis technique using neural networks

    International Nuclear Information System (INIS)

    Horiguchi, Masahiro; Fukawa, Naohiro; Nishimura, Kazuo

    1991-01-01

    A nuclear power plant diagnosis technique has been developed, called transient phenomena analysis, which employs neural network. The neural networks identify malfunctioning equipment by recognizing the pattern of main plant parameters, making it possible to locate the cause of an abnormality when a plant is in a transient state. In a case where some piece of equipment shows abnormal behavior, many plant parameters either directly or indirectly related to that equipment change simultaneously. When an abrupt change in a plant parameter is detected, changes in the 49 main plant parameters are classified into three types and a characteristic change pattern consisting of 49 data is defined. The neural networks then judge the cause of the abnormality from this pattern. This neural-network-based technique can recognize 100 patterns that are characterized by the causes of plant abnormality. (author)

  9. Policy planning for nuclear power: An overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1993-08-01

    This special report, Policy Planning for Nuclear Power: An Overview of the Main Issues and Requirements, has been prepared in response to the express request of a number of IAEA Member States for a document to assist makers in developing countries on the introduction of nuclear power. The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. Further information and details on the technical and other issues presented in this report are given in the list of related IAEA publications and documents at the end of this report

  10. Performance analysis of conventional and sloped solar chimney power plants in China

    International Nuclear Information System (INIS)

    Cao Fei; Zhao Liang; Li Huashan; Guo Liejin

    2013-01-01

    The solar chimney power plant (SCPP) has been accepted as one of the most promising approaches for future large-scale solar energy applications. This paper reports on a heat transfer model that is used to compare the performance of a conventional solar chimney power plant (CSCPP) and two sloped solar chimney power plants (SSCPPs) with the collector oriented at 30° and 60°, respectively. The power generation from SCPPs at different latitudes in China is also analyzed. Results indicate that the larger solar collector angle leads to improved performance in winter but results in lower performance in summer. It is found that the optimal collector angle to achieve the maximum power in Lanzhou, China, is around 60°. Main factors that influence the performance of SCPPs also include the system height and the air thermophysical characteristics. The ground energy loss, reflected solar radiation, and kinetic loss at the chimney outlet are the main energy losses in SCPPs. The studies also show SSCPPs are more suitable for high latitude regions in Northwest China, but CSCPPs are suggested to be built in southeastern and eastern parts of China with the combination to the local agriculture. - Highlights: ► The optimum collector angle for maximum power generation is 60° in Lanzhou. ► Main parameters influencing performances are the system height and air property. ► Ground loss, reflected loss and outlet kinetic loss are the main energy losses. ► The sloped styles are suitable for Northwest China. ► The conventional styles are suitable for Southeast and East China.

  11. Canadian programs on understanding and managing aging degradation of nuclear power plant components

    International Nuclear Information System (INIS)

    Chadha, J.A.; Pachner, J.

    1989-06-01

    Maintaining adequate safety and reliability of nuclear power plants and nuclear power plant life assurance and life extension are growing in importance as nuclear plants get older. Age-related degradation of plant components is complex and not fully understood. This paper provides an overview of the Canadian approach and the main activities and their results towards understanding and managing age-related degradation of nuclear power plant components, structures and systems. A number of pro-active programs have been initiated to anticipate, detect and mitigate potential aging degradation at an early stage before any serious impact on plant safety and reliability. These programs include Operational Safety Management Program, Nuclear Plant Life Assurance Program, systematic plant condition assessment, refurbishment and upgrading, post-service examination and testing, equipment qualification, research and development, and participation in the IAEA programs on safety aspects of nuclear power plant aging and life extension. A regulatory policy on nuclear power plants is under development and will be based on the domestic as well as foreign and international studies and experience

  12. Cavitation preventing device in a nuclear power plant

    International Nuclear Information System (INIS)

    Hirose, Masao.

    1983-01-01

    Purpose: To prevent the generation of cavitation upon loss of feedwater flow rate in BWR nuclear power plant by reliably and rapidly tripping a recycling pump. Constitution: Two phase streams from a nuclear reactor are divided into main steams and saturated water in a steam drum. The deviation between the corresponding flow rate of the main steams and the feedwater flow rate of the feedwater pump sending condensates to the steam drum, as well as the continuing period of the deviation are monitored. Then, if it is detected that both of the deviation and the continuing period thereof exceed specified levels, the recycling pump feeding the saturated water to the reactor is tripped. In this way, the recycling pump can be tripped rapidly and reliably upon loss of feedwater flow rate, whereby the generation of the cavitation can be prevented and the normal operation of the nuclear power plant can be insured. (Moriyama, K.)

  13. Elecnuc. Nuclear power plants in the world; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1999 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1999; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; grid connection forecasts; world electric power market; electronuclear owners and share holders in EU, capacity and load factor; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; 1999 gross load factor by operator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  14. Effect of increased renewables generation on operation of thermal power plants

    International Nuclear Information System (INIS)

    Eser, Patrick; Singh, Antriksh; Chokani, Ndaona; Abhari, Reza S.

    2016-01-01

    Highlights: • Impacts of increased renewables in central European transmission system are assessed. • Individual transmission lines and power plants of transmission system are modelled. • Starts and ramps of thermal power plants significantly increase with increased renewables. • Impact of renewables on thermal power plants is highly dependent on location. - Abstract: High spatial and temporal resolution optimal power flow simulations of the 2013 and 2020 interconnected grid in Central Western and Eastern Europe regions are undertaken to assess the impact of an increased penetration of renewables on thermal power plants. In contrast to prior studies, the present work models each individual transmission line and power plant within the two regions. Furthermore, for conventional plants, electricity costs are determined with respect to fuel type, nameplate capacity, operating condition and geographic location; cycling costs are modeled as function of the recent operational history. For renewable power plants, costs and available power are determined using mesoscale weather simulations and hydrology models. Countrywide validation of the simulations shows that all renewable and most conventional power production is predicted with less than 10% error. It is shown that the increased penetration of renewables in 2020 will induce a 4–23% increase in the number of starts of conventional plants. The number of load ramps significantly increases by 63–181%, which underlines the necessity for equipment manufacturers and utilities to adapt to scenarios of high penetration of renewables. The increased cycling operation of coal plants is shown to depend strongly on the power plant’s location and is mainly observed in Germany and the Czech Republic. Austrian coal plants are cycled less because they supply more base load power to southern Germany, where several nuclear power plants will be phased out by 2020. Thus there is a need for more transmission capacity along

  15. Analysis of mercury in rock varnish samples in areas impacted by coal-fired power plants

    International Nuclear Information System (INIS)

    Nowinski, Piotr; Hodge, Vernon F.; Gerstenberger, Shawn; Cizdziel, James V.

    2013-01-01

    Rock varnish is a manganese–iron rich coating that forms on rocks, most often in arid climates. To assess its utility as an environmental monitor of mercury contamination, cold vapor atomic absorption spectrometry (CVAAS) was used for analysis. Samples were collected in the fallout patterns of two coal-fired power plants in southern Nevada: the defunct Mohave Power Plant (MPP) and the operating Reid Gardner Power Plant (RGPP). The resultant Hg concentrations in rock varnishes were plotted as a function of the distance from each power plant. The highest concentrations of Hg occurred at locations that suggest the power plants are the main source of pollutants. In addition, past tracer plume studies carried out at MPP show that the highest tracer concentrations coincide with the highest rock varnish Hg concentrations. However, additional samples are required to further demonstrate that power plants are indeed the sources of mercury in varnishes. -- Highlights: •We analyze desert varnish samples collected in the fallout patterns of two coal-fired and analyzed for Hg by CVAA. •The resultant Hg concentrations in the desert varnish samples were plotted as a function of the distance from each power plant. •The highest concentrations of Hg occurred at locations that suggest the power plants are the main source of pollutants. •Data indicate the utility of desert varnish as a passive environmental monitor for Hg atmospheric pollution. -- Cold vapor atomic absorption spectrometry (CVAAS) was used for analysis of mercury in varnished rocks collected in the fallout zones of two coal-fired power plants

  16. Environmental impact assessment of coal power plants in operation

    Directory of Open Access Journals (Sweden)

    Bartan Ayfer

    2017-01-01

    Full Text Available Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS. The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  17. Environmental impact assessment of coal power plants in operation

    Science.gov (United States)

    Bartan, Ayfer; Kucukali, Serhat; Ar, Irfan

    2017-11-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS). The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  18. Designing a nuclear power plant with 1000 MW WWER-type units

    International Nuclear Information System (INIS)

    Berkovich, V.; Kaloshin, J.; Tatarnikov, V.; Shenderovich, A.

    1977-01-01

    A brief description is presented of a WWER-1000 nuclear power plant also considering its environmental impact and the problem of core poisoning. The following indicators are graphically shown in relation to the reactor output: turbogenerator unit outputs, efficiency, specific capital costs and own costs of electric power generated by the Voronezh nuclear power plant. Also listed are the specific consumption of metal and concrete, specific equipment weight and the specific volume of the buildings of the main generating unit as well as the cross section thereof. (J.B.)

  19. Preparation for and building of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Smatlak, S.; Spirko, M.

    1981-01-01

    Some findings and problems encountered during the construction of the V-1 nuclear power plant at Jaslovske Bohunice are discussed from the point of view of the investor, mainly problems associated with project preparation and relations between suppliers and the customer. The progress of construction is described and the dates are shown of the main stages of construction and tests. The construction proceeded according to a net diagram and was controlled by the construction management and a coordination group headed by the investor. An international start-up commission was established for the start-up stage. The fields are outlined of the participation and co-operation of Soviet organizations during project preparation, supplies, assembly, start-up, and fuel supplies for the V-1 nuclear power plant. (B.S.)

  20. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  1. Safety-related occurrences at the Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Viitasaari, O.; Rantavaara, A.

    1984-03-01

    This report contains detailed descriptions of operating incidents and other safety-related matters at the Finnish nuclear power plants regarded as significant by the regulatory authority, the Finnish Centre for Radiation and Nuclear Safety. In this connection, an account is given of the practical actions caused by the incidents, and their significance to reactor safety is evaluated. The main features of the incidents are also described in the general Quartely Report for this period, Operation of Finnish Nuclear Power Plants (STL-B-RTO-83/7), which is supplemented by this report intended principally for experts. (author)

  2. Main ways for solution of nuclear power plant safety in the USSR

    International Nuclear Information System (INIS)

    Sidorenko, V.A.; Kovalevich, O.M.; Kramerov, A.Ya.; Bagdasarov, Yu.E.

    1977-01-01

    In this paper the principles of provisions of nuclear power plant (NPP) safety in the USSR based on the accumulated scientific and engineering experience of design, construction and operating of NPP are discussed. Methods for the decision of the problem were different in various stages of development of nuclear energy and they will be changed in the light of future experience and when the scope of NPP utilization will be broadened. It was formulated the complex of means and ways for providing the real safety of NPP. It includes both the technical and organizing measures and all they are important to solve the NPP safety problem. The first two of these conditions of providing the safety - the high quality of NPP equipment and its constant control during the whole operation of NPP - have to minimize possible failures of power plant elements capable of resulting in an accident conditions. Design and utilization of effective safety systems at NPP and localization systems - these are the next two conditions to provide the safety called upon either to exclude or to attenuate up to the reasonable level the radioactive product yield outside the determined boundaries. The normalization of safety problems and the effective state inspection after keeping the required actions are the next necessary links of this complex called upon to ensure the fulfillment of all safety requirements. The report concerns the realization of formulated procedure to the provision of NPP safety with reactors of WWER and RBM-K types are being put into operation in the Soviet Union. The versatility of approach to the safety provision allows to attain the required safety by various means depending on the type of reactor, its siting and other features concentrating attention to one or another factors. Alongside with the above-mentioned, the paper considers the special requirements and safety measures regarding reactors of next generation such as liquid metal breeders of BN-type and other systems [ru

  3. Thermodynamic analysis of the advanced zero emission power plant

    Directory of Open Access Journals (Sweden)

    Kotowicz Janusz

    2016-03-01

    Full Text Available The paper presents the structure and parameters of advanced zero emission power plant (AZEP. This concept is based on the replacement of the combustion chamber in a gas turbine by the membrane reactor. The reactor has three basic functions: (i oxygen separation from the air through the membrane, (ii combustion of the fuel, and (iii heat transfer to heat the oxygen-depleted air. In the discussed unit hot depleted air is expanded in a turbine and further feeds a bottoming steam cycle (BSC through the main heat recovery steam generator (HRSG. Flue gas leaving the membrane reactor feeds the second HRSG. The flue gas consist mainly of CO2 and water vapor, thus, CO2 separation involves only the flue gas drying. Results of the thermodynamic analysis of described power plant are presented.

  4. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    2000-01-01

    The Japan Atomic Industrial Forum (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Developmental trends on nuclear power plants in the world'. In this report, some data at the end of 1999 was made up on bases of answers on questionnaires from 72 electric companies in 31 nations and regions in the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; location of the plants; the plants in the world; and so forth. And, it also has some survey results on the 'Liberalization of electric power markets and nuclear power generation' such as some 70% of respondents in nuclear power for future option, gas-thermal power seen as power source with most to gain from liberalization, merits on nuclear power generation (environmental considerations and supply stability), most commonly voiced concern about new plant orders in poor economy, and so forth. (G.K.)

  5. Numerical study of evaporators in power plants for improved dynamic fl exibility

    DEFF Research Database (Denmark)

    Johansen, Axel Vodder Ohrt

    The main objective of this Ph.D. thesis is to describe and analyse the most recent knowledge about operational flexibility in steam power plant evaporators, based on mathematical / numerical methods. The thesis addresses a mathematical study of steam power plant evaporators and involves the reader...... will be introduced to basic concepts in the power sector, including lifetime terms, such as corrosion, creep and fatigue, related to the evaporator tubes, which are responsible for the transfer of energy from the boiler to the water / steam circuit of a power plant. New evaporator technologies are briefly described......, followed by a simulation of a steam power plant evaporator of Skærbækværket (SKV3), which is one of DONG Energy’s ten central CHP plants, built in 1998 and located in Skærbæk at the mouth of Kolding Fjord in Denmark. Here different heating profiles of the evaporator are investigated, as well...

  6. Vibrations measurement at the Embalse nuclear power plant's electrical generator

    International Nuclear Information System (INIS)

    Salomoni, R.C.; Belinco, C.G.; Pastorini, A.J.; Sacchi, M.A.

    1987-01-01

    After the modifications made at the Embalse nuclear power plant's electrical generator to reduce its vibration level produced by electromagnetic phenomena, it was necessary to perform measurements at the new levels, under different areas and power conditions. To this purpose, a work was performed jointly with the 'Vibrations Team' of the ANSALDO Company (the generator constructor) and the Hydrodynamic Assays Division under the coordination and supervision of the plant's electrical maintenance responsible. This paper includes the main results obtained and the instrumentation criteria and analysis performed. (Author)

  7. Investigation of occurrences of loss of external power supply in Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Conde, J.M.; Reig, J.

    1989-01-01

    The paper reports on an investigation undertaken by the Nuclear Safety Council into occurrences of loss of external power supply in Spanish light water plants between 1981 and 1987. During this period all of the plants investigated (nine), with the exception of one, experienced an event of this type. The causes, effects and duration of each are studied in detail and the conclusion is drawn that the main cause of this type of occurrence is the intrinsic instability of the Spanish national grid. The response of plants to these various failures in external power supply was studied, special attention being paid to the correct operation of safety systems. In addition, the behaviour of other systems not related to safety is discussed, as are modifications and actions taken as a result of accumulated experience with a view to improving the plant response in the event of the failure of the external power supply, and reducing the frequency of such occurrences and their effective duration. The data obtained from this analysis were compared with those obtained in studies performed in other countries and the conclusion was drawn that failures in the external power supply occur slightly more frequently in Spain than in other countries. Similarly, a comparison was drawn between plant response during an actual failure and the response obtained during loss of external power nuclear tests which are carried out in all Spanish plants during the startup (commissioning) programme, in order to ascertain whether the test itself is adequate. (author). 1 fig., 3 tabs

  8. Backfitting of the nuclear plant V1 power control system

    International Nuclear Information System (INIS)

    Karpeta, C.; Rubek, J.; Stirsky, P.

    1985-01-01

    The paper deals with some aspects of implementation of modifications into the Czechoslovak nuclear plant V1 control system as called for on the basis of experience gained during the first period of the plant operation. Brief description of the plant power control system and its main functions is given. Some deficiencies in the system performance during abnormal conditions are outlined and measures taken to overcome them are presented. (author)

  9. Optimum voltage of auxiliary systems for thermal and nuclear power plants

    International Nuclear Information System (INIS)

    Tokumitsu, Iwao; Segawa, Motomichi

    1979-01-01

    In the power plants in Japan, their unit power output has been greatly enhanced since the introduction of new powerful thermal power plants from 1950's to 1960's. In both thermal and nuclear power plants, 1,000 MW machines have been already in operation. The increase of unit power output results in the increase of in-plant load capacity. Of these the voltage adopted for in-plant low voltage systems is now mainly 440 V at load terminals, and the voltage for in-plant high voltage systems has been changing to 6 kV level via 3 kV and 4 kV levels. As plant capacity increases, the load of low voltage systems significantly increases, and it is required to raise the voltage of 400 V level. By the way, the low voltage in AC is specified to be not higher than 600 V. This makes the change within the above range comparatively easy. Considering these conditions, it is recommended to change the voltage for low voltage systems to 575 V at power source terminals and 550 V at load terminals. Some merits in constructing power systems and in economy by raising the voltage were examined. Though demerits are also found, they are only about 15% of total merits. The most advantageous point in raising the voltage is to be capable of increasing the supplying range to low voltage system loads. (Wakatsuki, Y.)

  10. Seismic re-evaluation of French nuclear power plants

    International Nuclear Information System (INIS)

    Andrieu, R.

    1995-01-01

    After a presentation of the seismic inputs which have been taken into account in the design of the French Nuclear Power Plants, the re-assessed values of these inputs are shown. Some considerations about the specificity of the French PWR program with regard to the standardisation of plants are given together with the present objectives of seismic re-evaluations. Finally the main results of the seismic re-analysis being performed for the Phenix Fast Reactor are considered. (author)

  11. Review of Investigations on Site Selection for Nuclear Power Plants in Croatia

    Energy Technology Data Exchange (ETDEWEB)

    Malbasa, N [Ekonerg, Zagreb (Croatia)

    2008-07-01

    A review of site investigation for nuclear facilities in the Republic of Croatia that had been performed from 1964, when investigation started for the first nuclear power plant, to 1994 when the activities were stopped, is presented therein. Brief results of the main investigation were presented including the Tanja site on the Danube upstream of Vukovar. It is the best of all the investigated locations for nuclear power plant in Croatia. The review of results for site selection of low and intermediate level of radioactive waste disposal is also given. The position of nuclear power plants in the strategic documents of the Republic of Croatia was analysed. It is concluded that the status of nuclear facilities in the main strategic documents must be improved because the energy future in Croatia - as almost in all European countries - could hardly be successful without any further development of nuclear energy.(author)

  12. Review of Investigations on Site Selection for Nuclear Power Plants in Croatia

    International Nuclear Information System (INIS)

    Malbasa, N.

    2008-01-01

    A review of site investigation for nuclear facilities in the Republic of Croatia that had been performed from 1964, when investigation started for the first nuclear power plant, to 1994 when the activities were stopped, is presented therein. Brief results of the main investigation were presented including the Tanja site on the Danube upstream of Vukovar. It is the best of all the investigated locations for nuclear power plant in Croatia. The review of results for site selection of low and intermediate level of radioactive waste disposal is also given. The position of nuclear power plants in the strategic documents of the Republic of Croatia was analysed. It is concluded that the status of nuclear facilities in the main strategic documents must be improved because the energy future in Croatia - as almost in all European countries - could hardly be successful without any further development of nuclear energy.(author)

  13. Transportable nuclear power plant T3C-M with two reactor plants of improved safety

    International Nuclear Information System (INIS)

    Ogloblin, B.G.; Gromov, B.F.

    1993-01-01

    Development and cultivating of districts in Siberia, North, Far East, Kamchatka and other remote or almost inaccessible district of the country depends to a large degree on their providing with power. The specific character of these districts imposes in turn a wide variety of special requirements upon the power sources. In particular, it is essential to provide the following; maximum manufacture availability of the whole equipment at the minimum volume of construction and installation work on operation site, high safety, longterm service life, ecologically, minimum scope of work on equipment in-service maintenance and inspection, etc. Taking into account the well-known difficulties connected with the delivery of conventional energy carriers to the above-mentioned districts and the situation with the alternative power sources, the application of the low-power nuclear plants (NPP) for these purposes looks definitely promising. Among the probable trends in creating the NPPs of this type as very promising is considered the possibility to apply the two-circuit reactor plant of the vessel type with the liquid lead as a primary coolant and free air as a secondary coolant and working medium in the open gas-turbine cycle. The nuclear plant T3C-M of improved safety with two of this type reactor plants with total electric power of 8 MW is developed by CDB of Machine Building with participation of several enterprises of St. Petersburg under the scientific leadership and is intended for generation of electric power and up to 4 Gcal/h of heat for populated areas and installations placed at long distance from the main electric power supply sources where it is difficult or non-efficient economically to deliver the conventional kinds of fuel. The main principles being laid as a basis when developing the proposed NPP will allow one to create mobile power sources which possess a high degree of safety and inherent self-protection

  14. Numerical analysis on the performance of solar chimney power plant system

    International Nuclear Information System (INIS)

    Xu Guoliang; Ming Tingzhen; Pan Yuan; Meng Fanlong; Zhou Cheng

    2011-01-01

    Power generating technology based on renewable energy resources will definitely become a new trend of future energy utilization. Numerical simulations on air flow, heat transfer and power output characteristics of a solar chimney power plant model with energy storage layer and turbine similar to the Spanish prototype were carried out in this paper, and mathematical model of flow and heat transfer for the solar chimney power plant system was established. The influences of solar radiation and pressure drop across the turbine on the flow and heat transfer, output power and energy loss of the solar chimney power plant system were analyzed. The numerical simulation results reveal that: when the solar radiation and the turbine efficiency are 600 W/m 2 and 80%, respectively, the output power of the system can reach 120 kW. In addition, large mass flow rate of air flowing through the chimney outlet become the main cause of energy loss in the system, and the collector canopy also results in large energy loss.

  15. Perspectives of nuclear power plants

    International Nuclear Information System (INIS)

    Vajda, Gy.

    2001-01-01

    In several countries the construction of nuclear power plants has been stopped, and in some counties several plants have been decommissioned or are planned to. Therefore, the question arises: have nuclear power plants any future? According to the author, the question should be reformulated: can mankind survive without nuclear power? To examine this challenge, the global power demand and its trends are analyzed. According to the results, traditional energy sources cannot be adequate to supply power. Therefore, a reconsideration of nuclear power should be imminent. The economic, environmental attractions are discussed as opposite to the lack of social support. (R.P.)

  16. Development of a computerized operator support system for BWR power plant

    International Nuclear Information System (INIS)

    Monta, K.; Sekimizu, K.; Sato, N.; Araki, T.; Mori, N.

    1985-01-01

    A computerized operator support system for BWR power plant has been developed since 1980 supported by the Japanese government. The main functions of the systems are post trip operational guidance, disturbance analysis, standby system management, operational margin monitoring and control rod operational guidance. The former two functions aim at protection against incidents during operation of nuclear power plants and the latter three functions aim at their prevention. As the final stage of the development, these functions are combined with the plant supervision function and are organized as an advanced man-machine interface for BWR power plant. During the above process, operator task analyses are performed to enable synthesis of these support functions for right fit to operator tasks and to realize a hierarchical structure for CRT displays for right fit to operators cognitive needs. (author)

  17. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    Energy is essential for national development. Nearly every aspect of development - from reducing poverty and raising living standards to improving health care, industrial and agricultural productivity - requires reliable access to modern energy resources. States may have different reasons for considering starting a nuclear power project to achieve their national energy needs, such as: lack of available indigenous energy resources, the desire to reduce dependence upon imported energy, the need to increase the diversity of energy resources and/or mitigation of carbon emission increases. The start of a nuclear power plant project involves several complex and interrelated activities with long duration. Experience shows that the time between the initial policy decision by a State to consider nuclear power up to the start of operation of its first nuclear power plant is about 10 to 15 years and that before specific project management can proceed, several key infrastructure issues have to be in place. The proper management of the wide scope of activities to be planned and implemented during this period represents a major challenge for the involved governmental, utility, regulatory, supplier and other supportive organizations. The main focus is to ensure that the project is implemented successfully from a commercial point of view while remaining in accordance with the appropriate engineering and quality requirements, safety standards and security guides. This publication is aimed at providing guidance on the practical management of a first nuclear power project in a country. There are many other issues, related to ensuring that the infrastructure in the country has been prepared adequately to ensure that the project will be able to be completed, that are only briefly addressed in this publication. The construction of the first nuclear power plant is a major undertaking for any country developing a nuclear power programme. Worldwide experience gained in the last 50 years

  18. A study on the leak monitoring of boiler tube in power plants

    International Nuclear Information System (INIS)

    Lee, Sang Guk

    2002-01-01

    Main equipment of thermal power plant, such as boiler and turbine, are designed and manufactured by domestic techniques. But the special equipments monitoring the operation status of these main facilities are still dependent upon foreign technology. Therefore, so as to develop boiler tube leak detection system, we performed studying on manufacturing, installation in site, Acoustic Emission (AE) signal analysis and discrimination etc. As result of studying on boiler tube leak detection using AE, we conformed that diagnosis for boiler tube and computerized their trend management is possible, and also it is expected to contribute to safe operation of power plant facilities

  19. Problems of power plant capital demands

    International Nuclear Information System (INIS)

    Slechta, V.; Bohal, L.

    1986-01-01

    The problems are discussed of requirements for investment for power plants in Czechoslovakia. Since the construction was finished of coal-burning 110 MW power plants with six power units, specific capital cost has steadily been growing. The growth amounts to 6 to 8% per year while the principle has been observed that specific capital cost decreases with increased unit power. Attention is paid to the cost of the subcontractors of the building and technological parts of a power plant and to the development of productivity of labour. A comparison is tabulated of cost for coal-burning power plants with 100 MW and 200 MW units and for nuclear power plants with WWER-440 reactors. Steps are suggested leading to a reduction of the capital cost of nuclear power plants. It is stated that should not these steps be taken, the envisaged development of nuclear power would be unbearable for the Czechoslovak national economy. (Z.M.). 8 tabs., 3 refs

  20. Energy and Exergy Analysis of 210 MW Jamshoro Thermal Power Plant

    Directory of Open Access Journals (Sweden)

    Muhib Ali Rajper

    2016-04-01

    Full Text Available In this paper, thermodynamic analysis of 210 MW dual-fire, subcritical, reheat steam power plant, situated near Jamshoro, Pakistan has been performed. Firstly, the plant is modeled by EES (Engineering Equation Solver software. Moreover; a parametric study is performed to assess the impacts of various operating parameters on the performance. The net power output, energy efficiency and exergy efficiency are considered as performance parameters of the plant whereas, condenser pressure, main steam pressure and main steam temperature are nominated as operating parameters. According to the results, the net power output, energy efficiency and exergy efficiency are determined as 186.5 MW, 31.37% and 30.41% respectively, under design operating conditions. The condenser contributed a major share in the total energy loss i.e. 280 MW (68.7% followed by boiler with 89 MW (21.8%. The major exergy destructing area is found in the boiler with 350 MW (82.11% of the total exergy destruction followed by turbine with 43.1 MW (10.12% and condenser 12 MW (5.74 %. According to the parametric study, variation in operating parameters had great influence on the plant performance

  1. Simulation of control performance under house load transients for nuclear power plant

    International Nuclear Information System (INIS)

    Liao Zhongyue; Wang Yuanlong; Tang Yuyuan; Liu Jiong

    1999-01-01

    The CATIA2 code is used to simulate the extreme normal transients--house load transients of Qinshan Phase II 600 MW nuclear power plant. The simulating results show that all of the reactor main parameters are operating in the allowable ranges, the reactor system is stable, and the control characteristics of the nuclear power plant is satisfactory. They are also good in agreement with Framatome's results

  2. Substantiation of the radiation monitoring scope in the region of nuclear power plant location

    Energy Technology Data Exchange (ETDEWEB)

    Zykova, A S; Zhakov, Yu A; Yambrovskii, Ya M

    1977-12-01

    To provide radiation safety of the population in the region of nuclear power plant location, it is necessary to define the character and quantity of radiation monitoring. On the basis of radiation monitoring of effluents from operating nuclear power plants it is found that the effluents can be registered at a distance of 5-7 km from the plant. The quantity of sample analysis of the main enviromental objectives must provide an exact definition of the content of radioactive substances produced by radioactive fallouts and effluents from nuclear power plants.

  3. Substantiation of the radiation monitoring scope in the region of nuclear power plant location

    International Nuclear Information System (INIS)

    Zykova, A.S.; Zhakov, Yu.A.; Jambrovskij, Ya.M.

    1977-01-01

    To provide radiation safety of the population in the region of nuclear power plant location, it is necessary to define the character and quantity of radiation monitoring. On the basis of radiation monitoring of flowouts from operating nuclear power plants it is found that the flowouts can be registered at a distance of 5-7 km from the plant. The quantity of sample analysis of the main enviromental objectives must provide an exact definition of the content of radioactive substances produced by radioactive fallouts and flowouts from nuclear power plants

  4. Nuclear power plant diagnostic system

    International Nuclear Information System (INIS)

    Prokop, K.; Volavy, J.

    1982-01-01

    Basic information is presented on diagnostic systems used at nuclear power plants with PWR reactors. They include systems used at the Novovoronezh nuclear power plant in the USSR, at the Nord power plant in the GDR, the system developed at the Hungarian VEIKI institute, the system used at the V-1 nuclear power plant at Jaslovske Bohunice in Czechoslovakia and systems of the Rockwell International company used in US nuclear power plants. These diagnostic systems are basically founded on monitoring vibrations and noise, loose parts, pressure pulsations, neutron noise, coolant leaks and acoustic emissions. The Rockwell International system represents a complex unit whose advantage is the on-line evaluation of signals which gives certain instructions for the given situation directly to the operator. The other described systems process signals using similar methods. Digitized signals only serve off-line computer analyses. (Z.M.)

  5. 700 C power plant technology. Status and challenge

    Energy Technology Data Exchange (ETDEWEB)

    Tschaffon, Helmut [E.ON Energie AG, Muenchen (Germany)

    2010-07-01

    Coal will remain an indispensable major source of energy for power generation in the world in the coming decades, because there are resources for hundreds of years. Coal fired power plants can be operated very flexible which gets increasing importance due to the stochastic input from regenerative energies like wind and solar energy. Sustainable technologies for cool-fired power plants have to be developed to optimise environmental protection and to save valuable resources and reduce CO{sub 2}-emissions. Future coal fired steam power plants aim an elevated steam temperature of about 700 C to reach a net efficiency of about 50%. This paper will give an overview over the status of the development of the 700 C technology and will highlight the challenges to be overcome before their commercial use. The European way to a 700 C Power plant started with the project AD700 in the year 1998. In this project the basic design of a 400 MW demo plant was done and some material tests and component qualifications for nickel-based alloys and new austenitic steels were started and terminated. AD700 delivered the basis of the design of the Component Test Facility COMTES700 (RFCS funded project with European manufacturers and utilities). COMTES 700 was operated between 2005 and 2009. It was integrated into the E.ON power plant Scholven in Germany to test mainly nickel based materials and power plant components. In the project NRWPP700 (2006-2010, funded by NRW and financed by European utilities) the detail design of the steam generator, piping system and turbine of a 500 MW power plant was done. In 7 material projects the qualification of components and materials was supported. At the same time of lot of national and international R and D projects (e.g. MARCKO and COORETEC) were performed. Due to the high amount of these projects they cannot be mentioned here in a detailed way. In 2007 the E.ON project 50plus was started. The aim was to plan and build a 700 C demo plant in

  6. Development of the nuclear plant analyzer for Korean standard Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Shin Hwan; Kim, Hyeong Heon; Song, In Ho; Hong, Eon Yeong; Oh, Yeong Taek [Korea Power Engineering Company Inc., Yongin (Korea, Republic of)

    2000-12-15

    The purpose of this study is to develop an NPA for the Ulchin Nuclear Power Plant Unit 3 and 4, the first KSNP type plant. In this study, the process model simulating the overall plant systems, GUI and simulation executive which provide the functions of an engineering simulator were developed, and the NPA was completed by integrating them. The contents and the scope of this study are as follows : main feedwater system, auxiliary feedwater system, Chemical and Volume Control System(CVCS), Safety Injection System(SIS), Shutdown Cooling System(SCS), electric power supply system, Core Protection Calculator(CPC), various plant control system, development of the graphics screens for each system, real-time simulation, simulation control for the enhancement of functional capabilities, user friendly GUI, collection of the design and operating data, establishment of the NPA database, integration of the GUI and simulation control program with process model, collection of the data for the verification and validation of the developed NPA, collection of the plant test data, collection and review of the results of other computer codes, verification of the simulation accuracy by comparing the NPA results with the actual plant data, validation of the simulation capability of the NPA, comparison against available data from other analysis suing different computer codes.

  7. Next Generation Geothermal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Brugman, John; Hattar, Mai; Nichols, Kenneth; Esaki, Yuri

    1995-09-01

    A number of current and prospective power plant concepts were investigated to evaluate their potential to serve as the basis of the next generation geothermal power plant (NGGPP). The NGGPP has been envisaged as a power plant that would be more cost competitive (than current geothermal power plants) with fossil fuel power plants, would efficiently use resources and mitigate the risk of reservoir under-performance, and minimize or eliminate emission of pollutants and consumption of surface and ground water. Power plant concepts were analyzed using resource characteristics at ten different geothermal sites located in the western United States. Concepts were developed into viable power plant processes, capital costs were estimated and levelized busbar costs determined. Thus, the study results should be considered as useful indicators of the commercial viability of the various power plants concepts that were investigated. Broadly, the different power plant concepts that were analyzed in this study fall into the following categories: commercial binary and flash plants, advanced binary plants, advanced flash plants, flash/binary hybrid plants, and fossil/geothed hybrid plants. Commercial binary plants were evaluated using commercial isobutane as a working fluid; both air-cooling and water-cooling were considered. Advanced binary concepts included cycles using synchronous turbine-generators, cycles with metastable expansion, and cycles utilizing mixtures as working fluids. Dual flash steam plants were used as the model for the commercial flash cycle. The following advanced flash concepts were examined: dual flash with rotary separator turbine, dual flash with steam reheater, dual flash with hot water turbine, and subatmospheric flash. Both dual flash and binary cycles were combined with other cycles to develop a number of hybrid cycles: dual flash binary bottoming cycle, dual flash backpressure turbine binary cycle, dual flash gas turbine cycle, and binary gas turbine

  8. Power plant chemical technology

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    17 contributions covering topies of fossil fuel combustion, flue gas cleaning, power plant materials, corrosion, water/steam cycle chemistry, monitoring and control were presented at the annual meeting devoted to Power Plant Chemical Technology 1996 at Kolding (Denmark) 4-6 September 1996. (EG)

  9. Configuration management in nuclear power plants

    CERN Document Server

    2003-01-01

    Configuration management (CM) is the process of identifying and documenting the characteristics of a facility's structures, systems and components of a facility, and of ensuring that changes to these characteristics are properly developed, assessed, approved, issued, implemented, verified, recorded and incorporated into the facility documentation. The need for a CM system is a result of the long term operation of any nuclear power plant. The main challenges are caused particularly by ageing plant technology, plant modifications, the application of new safety and operational requirements, and in general by human factors arising from migration of plant personnel and possible human failures. The IAEA Incident Reporting System (IRS) shows that on average 25% of recorded events could be caused by configuration errors or deficiencies. CM processes correctly applied ensure that the construction, operation, maintenance and testing of a physical facility are in accordance with design requirements as expressed in the d...

  10. Glossary of nuclear power plant ageing

    International Nuclear Information System (INIS)

    1999-01-01

    A glossary is presented of the terminology for understanding and managing the ageing of nuclear power plant systems, structures and components. This glossary has been published by NEA, in cooperation with CEC and IAEA, as a handy reference to facilitate and encourage use of common ageing terminology. The main benefits are improved reporting and interpretation of plant data on SSC degradation and failure, and improved interpretation and compliance with codes, regulations and standards related to nuclear plant ageing. The goal is to provide plant personnel with a common set of terms that have uniform, industry-wide meanings, and to facilitate discussion between experts from different countries. The glossary is in five languages: English, French, German, Spanish and Russian. In each language section terms are listed alphabetically, with sequential members which are repeated in the English section thus allowing cross-reference between al languages. (R.P.)

  11. Nuclear power plants in populated areas

    International Nuclear Information System (INIS)

    Wachsmann, F.

    1973-01-01

    The article first deals with the permanently increasing demand for electical power. Considering the ever growing energy demand which can no longer be covered by conventional power plants, it has become necessary to set up nuclear power plants of larger range. The author presents in a survey the basic function of nuclear power plants as well as the resulting risks and safety measures. The author concludes that according to present knowledge there is no more need to erect nuclear power plants outside densely populated urban areas but there is now the possibility of erecting nuclear power plants in densely populated areas. (orig./LH) [de

  12. Operating experience from Swedish nuclear power plants 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The total production of electricity from Swedish nuclear power plants was 65.6 TWh during 2002, which is a decrease compared to 2001. The energy capability factor for the 11 Swedish reactors averaged 80.8%. The PWRs at Ringhals averaged 87.6%, while the BWRs, not counting Oskarshamn 1, reached 89.2%. No events, which in accordance to conventions should be reported to IAEA, have occurred during 2002. Operational statistics are presented for each Swedish reactor. The hydroelectric power was 66 TWh, 16% lower than 2000. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 10.9 TWh. The electricity generation totalled 143 TWh, considerably less than the record high 2001 figure of 158.7 TWh. The preliminary figures for export were 14.8 TWh and and for import 20.1 TWh.

  13. Research on control function switch of nuclear power plant control room

    International Nuclear Information System (INIS)

    Mei Shibo; Mao Ting; Cheng Bo; Zhang Gang

    2014-01-01

    The nuclear power plant provides main control room (MCR) to the unit operators for the plant monitoring and control, and provides the remote shutdown station (RSS) as the back-up control room, which is used only when MCR is unavailable. The RSS could be used to monitor and control the plant, bring the plant into shutdown state and remove the residual heat. The command from MCR and RSS is blocked by each other and can not be executed at the same time. The operation mode switch function between MCR and RSS is carried out by MCR/RSS mode switches. The operation mode switch scheme of CPR1000, ERP and AP1000 were compared and researched, and some design bases for new nuclear power plant were submitted in this paper. These design bases could be referred during the design of control function switch for the new nuclear power plants, in order to put forward a more practical, simple, safe and convenient scheme. (authors)

  14. Measuring Situation Awareness of Operating Team in Different Main Control Room Environments of Nuclear Power Plants

    Directory of Open Access Journals (Sweden)

    Seung Woo Lee

    2016-02-01

    Full Text Available Environments in nuclear power plants (NPPs are changing as the design of instrumentation and control systems for NPPs is rapidly moving toward fully digital instrumentation and control, and modern computer techniques are gradually introduced into main control rooms (MCRs. Within the context of these environmental changes, the level of performance of operators in a digital MCR is a major concern. Situation awareness (SA, which is used within human factors research to explain to what extent operators of safety-critical systems know what is transpiring in the system and the environment, is considered a prerequisite factor to guarantee the safe operation of NPPs. However, the safe operation of NPPs can be guaranteed through a team effort. In this regard, the operating team's SA in a conventional and digital MCR should be measured in order to assess whether the new design features implemented in a digital MCR affect this parameter. This paper explains the team SA measurement method used in this study and the results of applying this measurement method to operating teams in different MCR environments. The paper also discusses several empirical lessons learned from the results.

  15. Choice of optimal working fluid for binary power plants at extremely low temperature brine

    Science.gov (United States)

    Tomarov, G. V.; Shipkov, A. A.; Sorokina, E. V.

    2016-12-01

    The geothermal energy development problems based on using binary power plants utilizing lowpotential geothermal resources are considered. It is shown that one of the possible ways of increasing the efficiency of heat utilization of geothermal brine in a wide temperature range is the use of multistage power systems with series-connected binary power plants based on incremental primary energy conversion. Some practically significant results of design-analytical investigations of physicochemical properties of various organic substances and their influence on the main parameters of the flowsheet and the technical and operational characteristics of heat-mechanical and heat-exchange equipment for binary power plant operating on extremely-low temperature geothermal brine (70°C) are presented. The calculation results of geothermal brine specific flow rate, capacity (net), and other operation characteristics of binary power plants with the capacity of 2.5 MW at using various organic substances are a practical interest. It is shown that the working fluid selection significantly influences on the parameters of the flowsheet and the operational characteristics of the binary power plant, and the problem of selection of working fluid is in the search for compromise based on the priorities in the field of efficiency, safety, and ecology criteria of a binary power plant. It is proposed in the investigations on the working fluid selection of the binary plant to use the plotting method of multiaxis complex diagrams of relative parameters and characteristic of binary power plants. Some examples of plotting and analyzing these diagrams intended to choose the working fluid provided that the efficiency of geothermal brine is taken as main priority.

  16. Recent computer applications in boiling water reactor power plants

    International Nuclear Information System (INIS)

    Hiraga, Shoji; Joge, Toshio; Kiyokawa, Kazuhiro; Kato, Kanji; Nigawara, Seiitsu

    1976-01-01

    Process computers in boiling water reactor power plants have won the position of important equipments for the calculation of the core and plant performances and for data logging. Their application technique is growing larger and larger every year. Here, two systems are introduced; plant diagnostic system and computerized control panel. The plant diagnostic system consists of the part processing the signals from a plant, the operation part mainly composed of a computer to diagnose the operating conditions of each system component using input signal, and the result display (CRT or typewriter). The concept on the indications on control panels in nuclear power plants is changing from ''Plant parameters and to be indicated on panel meters as much as possible'' to ''Only the data required for operation are to be indicated.'' Thus the computerized control panel is attracting attention, in which the process computer for processing the operating information and CRT display are introduced. The experimental model of that panel comprises and operator's console and a chief watchmen's console. Its functions are dialogic data access and the automatic selection of preferential information. (Wakatsuki, Y.)

  17. The end of cheap electric power from nuclear power plants. 2. ed.

    International Nuclear Information System (INIS)

    Franke, J.; Viefhues, D.

    1984-04-01

    The economic efficiency of a nuclear power plant is compared with that of a coal-fired power plant of the same size. A technical and economic computer model was developed which took account of the power plant and all its units as well as the fuel cycle (including intermediate storage and reprocessing). It was found that future nuclear power plants will be inferior to coal-fired power plants in all economic respects. Further, there was no load range in which the cost of electric power generation was more favourable in nuclear power plants than in coal-fired power plants. (orig./HSCH) [de

  18. Evaluation criteria for enhanced solar–coal hybrid power plant performance

    International Nuclear Information System (INIS)

    Zhao, Yawen; Hong, Hui; Jin, Hongguang

    2014-01-01

    Attention has been directed toward hybridizing solar energy with fossil power plants since the 1990s to improve reliability and efficiency. Appropriate evaluation criteria were important in the design and optimization of solar–fossil hybrid systems. Two new criteria to evaluate the improved thermodynamic performances in a solar hybrid power plant were developed in this study. Correlations determined the main factors influencing the improved thermodynamic performances. The proposed criteria can be used to effectively integrate solar–coal hybridization systems. Typical 100 MW–1000 MW coal-fired power plants hybridized with solar heat at approximately 300 °C, which was used to preheat the feed water before entering the boiler, were evaluated using the criteria. The integration principle of solar–coal hybrid systems was also determined. The proposed evaluation criteria may be simple and reasonable for solar–coal hybrid systems with multi-energy input, thus directing system performance enhancement. - Highlights: • New criteria to evaluate the solar hybrid power plant were developed. • Typical solar–coal hybrid power plants were evaluated using the criteria. • The integration principle of solar–coal hybrid systems was determined. • The benefits of the solar–coal hybrid system are enhanced at lower solar radiation

  19. Vibrations in pipelines of nuclear power plants

    International Nuclear Information System (INIS)

    Leal, M.R.L.V.; Bevilacqua, L.

    1984-01-01

    It is presented the main causes of vibrations in nuclear power plants pipelines to allow the identification of critical areas and correct the errors during the specification design. The methods of vibration analysis to give subsidies in the determination of the corrective providences when the problem appears during the commissioning or the generation energy, are also presented. (M.C.K.) [pt

  20. Atucha I nuclear power plant surveillance programme

    International Nuclear Information System (INIS)

    Jinchuk, D.

    1993-01-01

    After a review of the main characteristics of the Atucha I nuclear power plant and its pressure vessel, the embrittlement surveillance capsules and the irradiation conditions are described; Charpy impact tests and tensile tests were performed on the irradiated samples, and results are discussed and compared to theoretical calculations: transition temperature shifts, displacement per atom values. 6 refs., 16 figs., 7 tabs

  1. Atucha I nuclear power plant surveillance programme

    Energy Technology Data Exchange (ETDEWEB)

    Jinchuk, D [Comision Nacional de Energia Atomica, Buenos Aires (Argentina)

    1994-12-31

    After a review of the main characteristics of the Atucha I nuclear power plant and its pressure vessel, the embrittlement surveillance capsules and the irradiation conditions are described; Charpy impact tests and tensile tests were performed on the irradiated samples, and results are discussed and compared to theoretical calculations: transition temperature shifts, displacement per atom values. 6 refs., 16 figs., 7 tabs.

  2. Structural reliability of atomic power plant

    International Nuclear Information System (INIS)

    Klemin, A.I.; Polyakov, E.F.

    1980-01-01

    In 1978 the first specialized technical manual ''Technique of Calculating the Structural Reliability of an Atomic Power Plant and Its Systems in the Design Stage'' was developed. The present article contains information about the main characteristics and capabilities of the manual. The manual gives recommendations concerning the calculations of the reliability of such specific systems as the reactor control and safety system, the system of instrumentation and automatic control, and safety systems. 2 refs

  3. Design of nuclear power generation plants adopting model engineering method

    International Nuclear Information System (INIS)

    Waki, Masato

    1983-01-01

    The utilization of model engineering as the method of design has begun about ten years ago in nuclear power generation plants. By this method, the result of design can be confirmed three-dimensionally before actual production, and it is the quick and sure method to meet the various needs in design promptly. The adoption of models aims mainly at the improvement of the quality of design since the high safety is required for nuclear power plants in spite of the complex structure. The layout of nuclear power plants and piping design require the model engineering to arrange rationally enormous quantity of things in a limited period. As the method of model engineering, there are the use of check models and of design models, and recently, the latter method has been mainly taken. The procedure of manufacturing models and engineering is explained. After model engineering has been completed, the model information must be expressed in drawings, and the automation of this process has been attempted by various methods. The computer processing of design is in progress, and its role is explained (CAD system). (Kako, I.)

  4. Financing of nuclear power plant using resources of power generation

    International Nuclear Information System (INIS)

    Slechta, V.; Milackova, H.

    1987-01-01

    It is proved that during the lifetime of a power plant, financial resources are produced from depreciation and from the profit for the delivered electrical power in an amount allowing to meet the cost of construction, interests of credits, the corporation taxes, and the means usable by the utility for simple reproduction of the power plant, additional investment, or for the ultimate decommissioning of the nuclear power plant. The considerations are simplified to 1 MW of installed capacity of a WWER-440 nuclear power plant. The breakdown is shown of the profit and the depreciation over the power plant lifetime, the resources of regular payments of credit instalments for the construction and the method of its calculation, and the income for the state budget and for the utility during the plant liofetime. (J.B.). 5 tabs., 5 refs

  5. FRESCO, a simplified code for cost analysis of fusion power plants

    International Nuclear Information System (INIS)

    Bustreo, C.; Casini, G.; Zollino, G.; Bolzonella, T.; Piovan, R.

    2013-01-01

    Highlights: • FRESCO is a code for rapid evaluation of the cost of electricity of a fusion power plant. • Parameters of the basic machine and unitary costs of components derived from ITER. • Power production components and plant power balance are extrapolated from PPCS. • A special effort is made in the investigation of the pulsed operation scenarios. • Technical and economical FRESCO results are compared with those of two PPCS models. -- Abstract: FRESCO (Fusion REactor Simplified COsts) is a code based on simplified models of physics, engineering and economical aspects of a TOKAMAK-like pulsed or steady-state fusion power plant. The experience coming from various aspects of ITER design, including selection of materials and operating scenarios, is exploited as much as possible. Energy production and plant power balance, including the recirculation requirements, are derived from two models of the PPCS European study, the helium cooled lithium/lead blanket model reactor (model AB) and the helium cooled ceramic one (model B). A detailed study of the availability of the power plant due, among others, to the replacement of plasma facing components, is also included in the code. The economics of the fusion power plant is evaluated through the levelized cost approach. Costs of the basic components are scaled from the corresponding values of the ITER project, the ARIES studies and SCAN model. The costs of plant auxiliaries, including those of the magnetic and electric systems, tritium plants, instrumentation, buildings and thermal energy storage if any, are recovered from ITER values and from those of other power plants. Finally, the PPCS models AB and B are simulated and the main results are reported in this paper

  6. Nuclear Power Plants (Rev.)

    Energy Technology Data Exchange (ETDEWEB)

    Lyerly, Ray L.; Mitchell III, Walter [Southern Nuclear Engineering, Inc.

    1973-01-01

    Projected energy requirements for the future suggest that we must employ atomic energy to generate electric power or face depletion of our fossil-fuel resources—coal, oil, and gas. In short, both conservation and economic considerations will require us to use nuclear energy to generate the electricity that supports our civilization. Until we reach the time when nuclear power plants are as common as fossil-fueled or hydroelectric plants, many people will wonder how the nuclear plants work, how much they cost, where they are located, and what kinds of reactors they use. The purpose of this booklet is to answer these questions. In doing so, it will consider only central station plants, which are those that provide electric power for established utility systems.

  7. Safety assessment and verification for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    culture and achieve good performance in terms of safety. This publication identifies the main safety objectives and responsibilities of management with respect to the safe operation of nuclear power plants and associated corporate roles of the operating organization. This Safety Guide discusses the factors to be considered in (a) structuring the operating organization to meet these main safety objectives, (b) setting up management programmes that ensure that the safety tasks are performed, (c) establishing services and facilities that are intended to meet the above requirements and (d) maintaining a strong safety culture within the organization. This Safety Guide primarily addresses safety matters directly related to the operation of nuclear power plants. It assumes that the safety aspects of siting, design, manufacturing and construction have been resolved. It also covers the internal interrelationships between operations and design, construction and commissioning and other organizational units, and deals with the involvement of the operating organization in reviews of safety issues, bearing in mind future operation. Finally, this publication discusses the relationship between the operating organization, the regulatory body and the general public. Section 2 focuses on the operating organization and its structure. Section 3 discusses the functions, responsibilities, goals and objectives of the operating organization that ensure the safe operation of nuclear power plants. Section 4 gives guidance on the interface between the operating organization and external organizations. Section 5 covers safety management aspects. Section 6 provides guidance on the major management programmes that should be established to ensure the safe operation of a nuclear power plant. Section 7 discusses additional services that are needed to support the functioning of plant operation management programmes. Section 8 provides general guidance on the communication and liaison matters that are

  8. Safety assessment and verification for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    culture and achieve good performance in terms of safety. This publication identifies the main safety objectives and responsibilities of management with respect to the safe operation of nuclear power plants and associated corporate roles of the operating organization. This Safety Guide discusses the factors to be considered in (a) structuring the operating organization to meet these main safety objectives, (b) setting up management programmes that ensure that the safety tasks are performed, (c) establishing services and facilities that are intended to meet the above requirements and (d) maintaining a strong safety culture within the organization. This Safety Guide primarily addresses safety matters directly related to the operation of nuclear power plants. It assumes that the safety aspects of siting, design, manufacturing and construction have been resolved. It also covers the internal interrelationships between operations and design, construction and commissioning and other organizational units, and deals with the involvement of the operating organization in reviews of safety issues, bearing in mind future operation. Finally, this publication discusses the relationship between the operating organization, the regulatory body and the general public. Section 2 focuses on the operating organization and its structure. Section 3 discusses the functions, responsibilities, goals and objectives of the operating organization that ensure the safe operation of nuclear power plants. Section 4 gives guidance on the interface between the operating organization and external organizations. Section 5 covers safety management aspects. Section 6 provides guidance on the major management programmes that should be established to ensure the safe operation of a nuclear power plant. Section 7 discusses additional services that are needed to support the functioning of plant operation management programmes. Section 8 provides general guidance on the communication and liaison matters that are

  9. Regulatory control of maintenance activities in Argentine nuclear power plants

    International Nuclear Information System (INIS)

    Calvo, J.C.; Caruso, G.

    2000-01-01

    The main maintenance objective is to assure that the safety features of structures, components and systems of nuclear power plants are kept as designed. Therefore, there is a direct relationship between safety and maintenance. Owing to the above mentioned, maintenance activities are considered a relevant regulatory issue for the Argentine Nuclear Regulatory Authority (ARN). This paper describes the regulatory control to maintenance activities of Argentine nuclear power plants. It also addresses essential elements for maintenance control, routine inspections, special inspections during planned outages, audits and license conditions and requirements. (author)

  10. An environmental report for the first Israeli nuclear power plant

    International Nuclear Information System (INIS)

    Velner, S.

    1977-01-01

    At the end of 1974, following general activity in planning the nuclear power plant, the need for an Environment Report (ER) for that plant came up. The ER should concentrate mainly on the quality of life, while the Licensing Division of the IAEC is the body that supervises all the aspects of the ''safety of life''. The conclusions about the ER role can be summarized thus: it should be based on the American format adjusted to Israeli conditions, a separation between Safety of life and Quality of life factors will be utilized. The ER should deal with safety subjects only at a minimal level, the ER will deal with several alternate sites, most of information would be based on existing knowledge. These four principles are further developed in the content of the ER. Chapters of the ER: need of power, need of nuclear energy, siting of the nuclear plant, site comparison - demography and land and water use, site comparison - physical and ecological conditions, selection of site to be recommended, the nuclear plant, environmental impacts of the nuclear plant, the nuclear plant in the framework of overall Master plant for development of Electrical power. (B.G.)

  11. 76 FR 1469 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2011-01-10

    ... Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Environmental Assessment... Plant, LLC, the licensee, for operation of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2... Impact Statement for License Renewal of Nuclear Plants, Calvert Cliffs Nuclear Power Plant (NUREG-1437...

  12. Main facts 1995

    International Nuclear Information System (INIS)

    1996-01-01

    This report presents the main facts of the studies carried out by the Direction des Etudes et Recherches (DER) of Electricite de France: new applications of electricity, classical and nuclear thermal power plants, electrical equipment, environment protection, monitoring and plants operations

  13. Development of task analysis method for operator tasks in main control room of an advanced nuclear power plant

    International Nuclear Information System (INIS)

    Lin Chiuhsiangloe; Hsieh Tsungling

    2016-01-01

    Task analysis methods provide an insight for quantitative and qualitative predictions of how people will use a proposed system, though the different versions have different emphases. Most of the methods can attest to the coverage of the functionality of a system and all provide estimates of task performance time. However, most of the tasks that operators deal with in a digital work environment in the main control room of an advanced nuclear power plant require high mental activity. Such mental tasks overlap and must be dealt with at the same time; most of them can be assumed to be highly parallel in nature. Therefore, the primary aim to be addressed in this paper was to develop a method that adopts CPM-GOMS (cognitive perceptual motor-goals operators methods selection rules) as the basic pattern of mental task analysis for the advanced main control room. A within-subjects experiment design was used to examine the validity of the modified CPM-GOMS. Thirty participants participated in two task types, which included high- and low-compatibility types. The results indicated that the performance was significantly higher on the high-compatibility task type than on the low-compatibility task type; that is, the modified CPM-GOMS could distinguish the difference between high- and low-compatibility mental tasks. (author)

  14. Exergetic and environmental analysis of a pulverized coal power plant

    International Nuclear Information System (INIS)

    Restrepo, Álvaro; Miyake, Raphael; Kleveston, Fábio; Bazzo, Edson

    2012-01-01

    This paper presents the results of exergetic and environmental analysis of a typical pulverized coal power plant located in Brazil. The goal was to quantify both the exergy destruction and the environmental impact associated with a thermal power plant. The problem boundary consists of the entire coal delivery route, including mining and beneficiation, transport, pre-burning processes and the power plant. The used data were obtained mainly from field measurements taken in all system processes, from mining to the power plant. The study focused only on the operation period. Previous works have shown that the construction and decommissioning periods contribute less than 1% of the environmental impact. The exergetic analysis was based on the second law of thermodynamics while the environmental analysis was based on life cycle assessment (LCA) using SimaPro 7.2, focussing on the climate change and acidification impact categories. The CO 2 -eq emission was 1300 kg per MWh. The highest degree of environmental impact occurred during the combustion process. The exergetic and environmental analysis provides a tool to evaluate irreversibilities and the environmental impact, identifying the most significant stages and equipment of the entire power generation process. -- Highlights: ► Exergetic and environmental analysis of a typical Brazilian PC power plant. ► Environmental impact associated with the mining, transport and thermal power plant. ► Life cycle assessment used for environmental analysis. ► Acidification impact category evaluated using Eco-indicator 99. ► Climate change impact evaluation using (Global Warming Potential) GWP 100a.

  15. Elecnuc. Nuclear power plants worldwide; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This small folder presents a digest of some useful information concerning the nuclear power plants worldwide and the situation of nuclear industry at the end of 1997: power production of nuclear origin, distribution of reactor types, number of installed units, evolution and prediction of reactor orders, connections to the grid and decommissioning, worldwide development of nuclear power, evolution of power production of nuclear origin, the installed power per reactor type, market shares and exports of the main nuclear engineering companies, power plants constructions and orders situation, evolution of reactors performances during the last 10 years, know-how and development of nuclear safety, the remarkable facts of 1997, the future of nuclear power and the energy policy trends. (J.S.)

  16. Effect of nuclear and coal-fired power plants on the environment for the example of the tripol'e state regional power plant and the southern Ukraine nuclear power plant

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.; Vishnevskii, I.N.; Koval', G.N.

    1995-01-01

    A supply of energy is a necessary condition for maintaining the economy and the health and welfare of the people. For this reason, data on energy consumption are often used as an indicator of the level of development of a country. The Ukrainian economy is characterized by high consumption of energy resources. Heat and electric power plants make the main contribution to the production of electricity. In the last few years, in connection with the sharp increase in the price of fuel, changes have been made in the structure of fuel utilization at heat and electric power plants. The demand for oil and coal started to increase in 1992 (coal now comprises 60% of the total fuel consumption). At the present time there is a trend toward decreasing the consumption of oil and gas, which are imported into Ukraine, and correspondingly the consumption of local fuel resources has increased

  17. Simulation research on multivariable fuzzy model predictive control of nuclear power plant

    International Nuclear Information System (INIS)

    Su Jie

    2012-01-01

    To improve the dynamic control capabilities of the nuclear power plant, the algorithm of the multivariable nonlinear predictive control based on the fuzzy model was applied in the main parameters control of the nuclear power plant, including control structure and the design of controller in the base of expounding the math model of the turbine and the once-through steam generator. The simulation results show that the respond of the change of the gas turbine speed and the steam pressure under the algorithm of multivariable fuzzy model predictive control is faster than that under the PID control algorithm, and the output value of the gas turbine speed and the steam pressure under the PID control algorithm is 3%-5% more than that under the algorithm of multi-variable fuzzy model predictive control. So it shows that the algorithm of multi-variable fuzzy model predictive control can control the output of the main parameters of the nuclear power plant well and get better control effect. (author)

  18. Nuclear power plants in post-war thought

    International Nuclear Information System (INIS)

    Toya, Hiroshi

    2015-01-01

    This paper overviews how nuclear power plants have been talked about in the post-war thought. Science and technology sometimes significantly change the thinking way of humans, and nuclear power generation is an extreme technology. This paper overviews how nuclear power plants and humans are correlated. The following three points are discussed as the major issues of contemporary thought over nuclear power plants. First, on the danger of nuclear power plants, the risk of destructive power that nuclear energy has, and the danger of unreasoning development in science and technology civilization are discussed. Second, on the ethics issues surrounding nuclear power plants, the ethics that are based on unbalanced power relations, and democratic responsibility ethics based on discussion ethics are discussed. Third, on the issues of nuclear power plants and imagination, the limitations of democratic discussion surrounding nuclear power plants, the formation of imagination commensurate with the destructive power of nuclear power plants, and the formation of imagination that can represent the distant future are discussed. (A.O.)

  19. Design of nuclear power plants

    International Nuclear Information System (INIS)

    Lobo, C.G.

    1987-01-01

    The criteria of design and safety, applied internationally to systems and components of PWR type reactors, are described. The main criteria of the design analysed are: thermohydraulic optimization; optimized arrangement of buildings and components; low costs of energy generation; high level of standardization; application of specific safety criteria for nuclear power plants. The safety criteria aim to: assure the safe reactor shutdown; remove the residual heat and; avoid the release of radioactive elements for environment. Some exemples of safety criteria are given for Angra-2 and Angra-3 reactors. (M.C.K.) [pt

  20. Hybrid wind-power-distillation plant

    Directory of Open Access Journals (Sweden)

    Ninić Neven

    2012-01-01

    Full Text Available This paper reports and elaborates on the idea of a solar distiller and an offshore wind power plant operating together. The subject under discussion is a single-stage solar distillation plant with vaporization, using adiabatic expansion in the gravitational field inside a wind power plant supporting column. This scheme divides investment costs for electric power and distillate production. In the region of the Adriatic Sea, all electric power produced could be “converted” to hydrogen using less than 10% of the distillate produced.

  1. Experience with training of operating and maintenance personnel of nuclear power plants

    International Nuclear Information System (INIS)

    Pospisil, M.; Cencinger, F.

    1988-01-01

    The system is described of the specialist training of personnel for Czechoslovak nuclear power plants. Training consists of basic training, vocational training and training for the respective job. Responsible for the training is the Research Institute for Nuclear Power Plants; actual training takes place at three training centres. Personnel are divided into seven categories for training purposes: senior technical and economic staff, shift leaders, whose work has immediate effect on nuclear safety, engineering and technical personnel of technical units, shift leaders of technical units, personnel in technical units, shift service personnel and operating personnel, maintenance workers. Experience with training courses run at the training centre is summed up. Since 1980 the Centre has been training personnel mainly for the Dukovany nuclear power plant. Recommendations are presented for training personnel for the Temelin nuclear power plant. (Z.M.)

  2. Power plants 2009. Lectures

    International Nuclear Information System (INIS)

    2009-01-01

    Within the Annual Conference 2009 of the VGB PowerTech e.V. (Essen, Federal Republic of Germany) from 23rd to 25th May, 2009, in Lyon (France) the following lectures were held: (1) Electricity demand, consequences of the financial and economic crisis - Current overview 2020 for the EU-27 (Hans ten Berge); (2) Status and perspectives of the electricity generation mix in France (Bernard Dupraz); (3) European electricity grid - status and perspective (Dominique Maillard); (4) Technologies and acceptance in the European energy market (Gordon MacKerran); (5) EPR construction in Finland, China, France, (Claude Jaouen); (6) EPR Flamanville 3: A project on the path towards nuclear revival (Jacques Alary); (7) Worldwide nuclear Revival and acceptance (Luc Geraets); (8) An overview on the status of final disposal of radioactive wastes worldwide (Piet Zuidema); (9) Who needs pumped storage plants? PSP are partner to grid stability and renewable energies (Hans-Christoph Funke); (10) Sustainable use of water resources to generate electricity safely and efficiently (Patrick Tourasse); (11) The growth strategy of RWE Innogy - Role of RES in RWE strategy (Fritz Vahrenholt); (12) Solar technologies towards grid parity - key factors and timeframe (G. Gigliucci); (13) Overview on CCS technologies and results of Vattenfalls oxyfuel pilot plant (Philippe Paelinck); (14) Development perspectives of lignite-based IGCC-plants with CCS (Dietmar Keller); (15) Post combustion capture plants - concept and plant integration (Wolfgang Schreier); (16) CCS fossil power generation in a carbon constraint world (Daniel Hofmann); (17) CEZ group strategy in Central and South Eastern Europe (Jan Zizka); (18) Strategy and projects of DONG Energy (Jens Erik Pedersen); (19) E.ON coal-based power generation of the future - The highly efficient power plant and downstream separation of carbon dioxide (Gerhard Seibel); (20) Final sage of first supercritical 460 MW e l. CFB Boiler construction - firs

  3. Automated control system for the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Labik, V.

    1990-01-01

    Instrumentation of the automated control system of the Temelin nuclear power plant in the section of the main production unit and of the major auxiliary equipment is described, the results of testing are reported, and the present status of design activities is assessed. The suitability of application of Czechoslovak automation facilities to the instrumentation of the automated control system of the power plant was confirmed by the Soviet designer and supplier based on favorable results of polygonal testing. Capacity problems in the development of the designs and user software are alleviated by extensive cooperation. It is envisaged that all tasks will be fulfilled as planned. (P.A.). 1 fig., 5 refs

  4. Siting studies for new nuclear power plants in Argentina

    International Nuclear Information System (INIS)

    Barbaran, Gustavo A.

    2008-01-01

    This paper is a summary of the thesis prepared by the Group of Prospective and Energy Planning of the National Atomic Energy Commission for the 'Specialization on Applications of Nuclear Technology Course' of the Instituto Balseiro in 2007. It describes the evolution of siting studies through time and the main focus worldwide in this type of studies. Then, it makes a brief review of previous siting studies of nuclear power plants conducted in Argentina. It carries out a description of the methodology to conduct a site evaluation for nuclear power plants according to actual international criteria. Finally, it describes the licensing process that follows every site study. (author) [es

  5. Measurents of natural radioactivity in an underground hydroelectric power plant

    International Nuclear Information System (INIS)

    Malvicini, Andrea; Esposito, PierLuigi; Depiesse, Danielle

    2008-01-01

    In underground working places, especially when ventilation is not properly regulated, large amounts of natural radioactivity can be found. This can give rise to potential exposures of non-negligible magnitude. Direct measurements of gamma radiation and radon were carried out during excavation works for the construction of an hydroelectric plant in the north of Italy. After the construction of the plant, in order to reduce radon concentrations and to improve ventilation effectiveness, the main entry gate was motorized and automated. Then, in order to find the optimal speed for the fans located in the galleries and in the power plant, radon and airflow velocity were measured. Correlation data between airflow and radon concentrations were found. An automatic regulation system has been set up using air velocity detectors and slightly modifying the software for the control and regulation of the power plant. Measurements must be made in order to identify radon sources and evaluate quantitative contributions as a function of ventilation. Underground hydroelectric plants are provided with entry galleries as well as secondary galleries from which radon coming out from the soil and the walls can exhale in quantities that depend on the contents of 226 Ra in the rocks and in the building materials. Other radon sources are the water coming out from the walls of the galleries and the water in the deep well located at the bottom of the power plant. Geological studies and mathematical models are useful means for the analysis of the relative contributions of the main sources as well as for the prediction of the effects deriving from modifications of the hydroelectric plant ventilation system or resulting from other important structural changes. (author)

  6. Diagnostic knowledge generation of nuclear power plants using knowledge compilers

    International Nuclear Information System (INIS)

    Yoshikawa, Shinji; Endou, Akira; Ikeda, Mitsuru; Mizoguchi, Riichiro

    1994-01-01

    This paper discusses a method to generate diagnostic knowledge of nuclear power plants, from commonly accepted physical knowledge and design information about plant configuration. This method is based on qualitative reasoning, which is advantageous to numerical information processing in the sense that system can explain why and how directly applicable knowledge is correctly generated, and that knowledge base is highly reusable and expandable because it is independent on detailed numerical design specifications. However, reasoning ambiguity has been found as the largest problem in applying the technique to nuclear power plants. The proposed approach mainly consists of a knowledge representation scheme, reasoning algorithm, and qualitative model construction method. (author). 4 refs, 8 figs, 1 tab

  7. Seismic considerations in the design of atomic power plants

    International Nuclear Information System (INIS)

    Arya, A.S.; Chandrasekaran, A.R.; Thakkar, S.K.

    1975-01-01

    A seismic design is one of the most important factors for the safety of nuclear power plants constructed in seismic areas. The various considerations in the design of atomic power plant structures and components to achieve high degree (near absolute) of safety during future probable earthquakes is described as follows: (a) determination of design earthquake parameters for SSE and OBE (b) fixing time history accelerograms and acceleration response spectra (c) mathematical modelling of the reactor building considering soil-structure interaction (d) deciding allowable stresses, damping factors and serviceability limits like drift, displacements and crack widths (e) tests for determining stiffness and damping characteristics of components in-situ before commissioning of plant. The main questions that arise under various items requiring further research investigations or development work are pointed out for discussion. (author)

  8. Sensitivity analysis of technological, economic and sustainability evaluation of power plants using the analytic hierarchy process

    International Nuclear Information System (INIS)

    Chatzimouratidis, Athanasios I.; Pilavachi, Petros A.

    2009-01-01

    Technological, economic and sustainability evaluation of power plants by use of the analytic hierarchy process and nine end node criteria for a reference scenario based on subjective criteria weighting has been presented in a previous paper by authors. However, criteria weight variations may substantially modify overall evaluations and rankings of power plants. The current paper presents a sensitivity analysis with four alternative scenarios (sets of criteria weights) compared with the reference scenario. The results show that priority to 'technology and sustainability' favors renewable energy power plants, while priority to 'economic' criteria favors mainly nuclear power plants and less the four types of fossil fuel power plant

  9. Human Reliability analysis for digitized nuclear power plants: Case study on the LingAo II nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Zou, Yan Hua; Zhang, Li [Institute of Human Factors Engineering AND Safety Management, Hunan Institute of Technology, Hengyang (China); Dai, Cao; Li, Peng Cheng; Qing, Tao [Human Factors Institute, University of South China, Hengyang (China)

    2017-03-15

    The main control room (MCR) in advanced nuclear power plants (NPPs) has changed from analog to digital control system (DCS). Operation and control have become more automated, centralized, and accurate due to the digitalization of NPPs, which has improved the efficiency and security of the system. New issues associated with human reliability inevitably arise due to the adoption of new accident procedures and digitalization of main control rooms in NPPs. The LingAo II NPP is the first digital NPP in China to apply the state-oriented procedure. In order to address issues related to human reliability analysis for DCS and DCS + state-oriented procedure, the Hunan Institute of Technology conducted a research project based on a cooperative agreement with the LingDong Nuclear Power Co. Ltd. This paper is a brief introduction to the project.

  10. Human Reliability Analysis for Digitized Nuclear Power Plants: Case Study on the LingAo II Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Yanhua Zou

    2017-03-01

    Full Text Available The main control room (MCR in advanced nuclear power plants (NPPs has changed from analog to digital control system (DCS. Operation and control have become more automated, centralized, and accurate due to the digitalization of NPPs, which has improved the efficiency and security of the system. New issues associated with human reliability inevitably arise due to the adoption of new accident procedures and digitalization of main control rooms in NPPs. The LingAo II NPP is the first digital NPP in China to apply the state-oriented procedure. In order to address issues related to human reliability analysis for DCS and DCS + state-oriented procedure, the Hunan Institute of Technology conducted a research project based on a cooperative agreement with the LingDong Nuclear Power Co. Ltd. This paper is a brief introduction to the project.

  11. Thermal power plant design and operation

    CERN Document Server

    Sarkar, Dipak

    2015-01-01

    Thermal Power Plant: Design and Operation deals with various aspects of a thermal power plant, providing a new dimension to the subject, with focus on operating practices and troubleshooting, as well as technology and design. Its author has a 40-long association with thermal power plants in design as well as field engineering, sharing his experience with professional engineers under various training capacities, such as training programs for graduate engineers and operating personnel. Thermal Power Plant presents practical content on coal-, gas-, oil-, peat- and biomass-fueled thermal power

  12. Options for shortening nuclear power plant refueling outages

    International Nuclear Information System (INIS)

    Kastl, H.

    2001-01-01

    Deregulation of the European electricity market on 01.01.1999 forced a large number of electric utilities- especially nuclear power plant operators - to find ways of drastically cutting down their costs in order to be able to compete successfully within the new market environment. Nuclear power plants currently in operation mainly have three potential ways of reducing their power generating costs: by increasing plant availability, reducing fuel costs and cutting down operating costs. The optimization of plant refueling outages offers considerable potential for enhancing plant availability, but also helps bring down operating costs by reducing expenditure on maintenance. In order to optimize an outage in terms of its duration and costs, a variety of approaches are possible - all of which, however, involve certain key factors such as good organization, planning, logistics and control, improvement of equipment and tools, as well as motivation of personnel. Another aspect is the introduction of innovative technologies. In the last few years, such technologies have frequently enabled maintenance effort to be reduced, thus saving considerable time, and have also resulted in a need for fewer personnel to carry out the work, thus reducing radiation exposure. In many instances they have also improved the quality of work and outage performance as a whole. The paper uses recent examples to show how innovative technologies can contribute to-wards reducing nuclear plant maintenance costs and shorten the duration of refueling out-ages. (author)

  13. Small-scale power plant potential in Finland

    International Nuclear Information System (INIS)

    Helynen, S.

    1993-01-01

    The presentation discusses the small-scale power plant potential in Finland. The study of the potential is limited to W-scale power plants producing both electric power and heat using solid fuels. The basic power plant dimensioning and electric power load determination is based on traditional boiler and gas turbine technology. The possible sites for power plants are communities using district heating, and industrialized sites needing process steam or heat. In 1990 70 % (17 TWh) of district heat was produced by gas turbines. Ten communities have an own back-pressure power plant, and 40 communities buy heat from industrial plants, owing back-pressure power generation. Additionally about 40 communes buy district heat from companies, owned by power companies and industry. Estimates of small-scale power plant potential has been made plant wise on the basis of district heat loads and industrial heat needs. The scale of the plants has been limited to scale 3 MWe or more. The choosing of the fuel depends on the local conditions. The cheapest indigenous fuels in many communes are industrial wood wastes, and both milled and sod peat. The potential of steam technology based small-scale power plants has been estimated to be about 50 plants in 1992/1993, the total power of which is 220-260 MW. The largest estimate is base situation, in which there would be energy cooperation between the communes and industry. The fuel used by the power plants would be about 5.4-6.6 TWh/a corresponding to 270-330 million FIM/a. The total investment costs of the plants would be about 2.0 billion FIM. The plants would employ about 250 persons, and the fuel supply (wood or peat) about 100 persons

  14. Thermal Power Plant Performance Analysis

    CERN Document Server

    2012-01-01

    The analysis of the reliability and availability of power plants is frequently based on simple indexes that do not take into account the criticality of some failures used for availability analysis. This criticality should be evaluated based on concepts of reliability which consider the effect of a component failure on the performance of the entire plant. System reliability analysis tools provide a root-cause analysis leading to the improvement of the plant maintenance plan.   Taking in view that the power plant performance can be evaluated not only based on  thermodynamic related indexes, such as heat-rate, Thermal Power Plant Performance Analysis focuses on the presentation of reliability-based tools used to define performance of complex systems and introduces the basic concepts of reliability, maintainability and risk analysis aiming at their application as tools for power plant performance improvement, including: ·         selection of critical equipment and components, ·         defini...

  15. Reliability of dc power supplies in nuclear power plant application

    International Nuclear Information System (INIS)

    Eisenhut, D.G.

    1978-01-01

    In June 1977 the reliability of dc power supplies at nuclear power facilities was questioned. It was postulated that a sudden gross failure of the redundant dc power supplies might occur during normal plant operation, and that this could lead to insufficient shutdown cooling of the reactor core. It was further suggested that this potential for insufficient cooling is great enough to warrant consideration of prompt remedies. The work described herein was part of the NRC staff's efforts aimed towards putting the performance of dc power supplies in proper perspective and was mainly directed towards the particular concern raised at that time. While the staff did not attempt to perform a systematic study of overall dc power supply reliability including all possible failure modes for such supplies, the work summarized herein describes how a probabilistic approach was used to supplement our more usual deterministic approach to reactor safety. Our evaluation concluded that the likelihood of dc power supply failures leading to insufficient shutdown cooling of the reactor core is sufficiently small as to not require any immediate action

  16. Power control of the Angra-2 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Souza Mendes, J.E. de

    1986-01-01

    The systems for the power control of the Nuclear Power Plant Angra 2 have a high degree of automation so that few operator actions are required during power operation. The power control strategy and the operation principles of the control systems, here presented, make possible a great flexibility of the Plant operation. (Author) [pt

  17. Organizing nuclear power plant operation

    International Nuclear Information System (INIS)

    Adams, H.W.; Rekittke, K.

    1987-01-01

    With the preliminary culmination in the convoy plants of the high standard of engineered safeguards in German nuclear power plants developed over the past twenty years, the interest of operators has now increasingly turned to problems which had not been in the focus of attention before. One of these problems is the organization of nuclear power plant operation. In order to enlarge the basis of knowledge, which is documented also in the rules published by the Kerntechnischer Ausschuss (Nuclear Technology Committee), the German Federal Minister of the Interior has commissioned a study of the organizational structures of nuclear power plants. The findings of that study are covered in the article. Two representative nuclear power plants in the Federal Republic of Germany were selected for the study, one of them a single-unit plant run by an independent operating company in the form of a private company under German law (GmbH), the other a dual-unit plant operated as a dependent unit of a utility. The two enterprises have different structures of organization. (orig.) [de

  18. An analysis of factors that influence the technical efficiency of Malaysian thermal power plants

    International Nuclear Information System (INIS)

    See, Kok Fong; Coelli, Tim

    2012-01-01

    The main objectives of this paper are to measure the technical efficiency levels of Malaysian thermal power plants and to investigate the degree to which various factors influence efficiency levels in these plants. Stochastic frontier analysis (SFA) methods are applied to plant-level data over an eight year period from 1998 to 2005. This is the first comprehensive analysis (to our knowledge) of technical efficiency in the Malaysian electricity generation industry using parametric method. Our empirical results indicate that ownership, plant size and fuel type have a significant influence on technical efficiency levels. We find that publicly-owned power plants obtain average technical efficiencies of 0.68, which is lower than privately-owned power plants, which achieve average technical efficiencies of 0.88. We also observe that larger power plants with more capacity and gas-fired power plants tend to be more technically efficient than other power plants. Finally, we find that plant age and peaking plant type have no statistically significant influence on the technical efficiencies of Malaysian thermal power plants. - Highlights: ► We examine the technical efficiency (TE) levels of Malaysian thermal power plants. ► We also investigate the degree to which various factors influence efficiency levels in these plants. ► Stochastic frontier analysis methods are used. ► Average plant would have to increase their TE level by 21% to reach the efficient frontier. ► Ownership, plant size and fuel type have a significant influence on the TE levels.

  19. Fuel combustion in thermal power plants in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R.

    1983-11-01

    The position of black coal in the energy balance of Japan is discussed. About 75% of electric energy is produced by thermal power plants. Eighty-five per cent of electricity is produced by power plants fired with liquid fuels and 3% by coal fired plants. Coal production in Japan, the forecast coal import to the country by 1990 (132 Mt/year), proportion of coal imported from various countries, chemical and physical properties of coal from Australia, China and Japan are discussed. Coal classification used in Japan is evaluated. The following topics associated with coal combustion in fossil-fuel power plants in Japan are discussed: coal grindability, types of pulverizing systems, slagging properties of boiler fuel in Japan, systems for slag removal, main types of steam boilers and coal fired furnaces, burner arrangement and design, air pollution control from fly ash, sulfur oxides and nitrogen oxides, utilization of fly ash for cement production, methods for removal of nitrogen oxides from flue gas using ammonia and catalysts or ammonia without catalysts, efficiency of nitrogen oxide control, abatement of nitrogen oxide emission from boilers by flue gas recirculation and reducing combustion temperatures. The results of research into air pollution control carried out by the Nagasaki Technical Institute are reviewed.

  20. Advanced power plant materials, design and technology

    Energy Technology Data Exchange (ETDEWEB)

    Roddy, D. (ed.) [Newcastle University (United Kingdom). Sir Joseph Swan Institute

    2010-07-01

    The book is a comprehensive reference on the state of the art of gas-fired and coal-fired power plants, their major components and performance improvement options. Selected chapters are: Integrated gasification combined cycle (IGCC) power plant design and technology by Y. Zhu, and H. C. Frey; Improving thermal cycle efficiency in advanced power plants: water and steam chemistry and materials performance by B. Dooley; Advanced carbon dioxide (CO{sub 2}) gas separation membrane development for power plants by A. Basile, F. Gallucci, and P. Morrone; Advanced flue gas cleaning systems for sulphur oxides (SOx), nitrogen oxides (NOx) and mercury emissions control in power plants by S. Miller and B.G. Miller; Advanced flue gas dedusting systems and filters for ash and particulate emissions control in power plants by B.G. Miller; Advanced sensors for combustion monitoring in power plants: towards smart high-density sensor networks by M. Yu and A.K. Gupta; Advanced monitoring and process control technology for coal-fired power plants by Y. Yan; Low-rank coal properties, upgrading and utilisation for improving the fuel flexibility of advanced power plants by T. Dlouhy; Development and integration of underground coal gasification (UCG) for improving the environmental impact of advanced power plants by M. Green; Development and application of carbon dioxide (CO{sub 2}) storage for improving the environmental impact of advanced power plants by B. McPherson; and Advanced technologies for syngas and hydrogen (H{sub 2}) production from fossil-fuel feedstocks in power plants by P. Chiesa.

  1. Standardized small diesel power plants for rural electrification in Tanzania

    International Nuclear Information System (INIS)

    Holmqvist, A.; Soerman, J.; Gullberg, M.; Kjellstroem, B.

    1993-01-01

    This study focuses on small townships where the forecasted power demand stays below 500 kW during the ten first years. Case study calculations were made where two hypothetical load centres form the base. Each load centre is assumed to be supplied by two alternative standardized diesel power plants. One option is a power plant consisting of two medium speed (750 rpm) generator sets, one always on stand-by. Alternatively, a power plant consisting of three high speed (1500 rpm) generator sets is evaluated for each hypothetical load centre. The calculations clearly show that the high speed, three unit option comes out cheaper than the two unit, medium speed option in all the considered cases. The fuel costs per kWh generated are almost the same in all the cases studied, i.e. between 6 and 7 US cents. The medium speed engine tends to consume more fuel per kWh generated than the high speed, as it runs more often on part load. Consequently, the fuel costs will be slightly higher for this option. It is also of interest to compare the plant failure rate of the two options. In this study no proper probability evaluation has been made, but some general reflections can be worth considering. The availability of spare parts in Tanzania is doubtful. Many small diesel power plants presently operating have to wait indefinitely, when a failure appears that requires spare parts. As long as the individual sets have the same, or nearly the same failure rate, a three unit plant has lower probability for total loss of generating capacity than a two unit plant. The main conclusion of this evaluation is that for electricity generation in rural Tanzanian villages, power plants with three small, high speed generator sets are preferable to plants with two, medium speed generator sets. A power plant made out of small sets requires less capital, consumes less fuel and is not as likely to loose its generating capacity totally. 16 refs, 10 figs, 21 tabs

  2. Chemistry in power plants 2011; Chemie im Kraftwerk 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Within the VGB Powertech conference from 25th to 27th October, 2011, in Munich (Federal Republic of Germany), the following lectures and poster contributions were presented: (1) The revised VGB standard for water-steam-cycle Chemistry; (2) Switchover from neutral operation to oxygen treatment at the power station Stuttgart-Muenster of EnBW Kraftwerke AG; (3) Steam contamination with degradation products of organic matters present in the feedwater of the Lanxess-Rubber cogeneration plant; (4) Laboratory scale on-line noble metal deposition experiments simulating BWR plant conditions; (5) Building a new demin installation for the power plant EPZ in Borssele; (6) Replacement of the cooling tower installations in the nuclear power plant Goesgen-Daenien AG; (7) Aging of IEX resins in demin plants - Cost optimisation by adaptation of regenerants; (8) The largest DOW trademark EDI System at a combined cycled plant in Europe; (9) Upgrading river Main water to boiler feed water - Experiences with ultrafiltration; (10) Experiences with treatment of the water-steam-cycle in the RDF power plant Nehlsen Stavenhagen with film-forming amines; (11) Comparative modelling of the bubbles thermal collapse and cavitations for estimation of bubbles collapse influence; (12) Overcoming the steam quality - issues from an HRSG for the production of process steam; (13) Legionella - new requirements for power plant operation; (14) How the right chemistry in the FGD helps to improve the removal in the waste water treatment plant; (15) High efficiency filtration in dry/semi-dry FGD plants; (16) Expanding the variety of renewable fuels in the biomass power plant Timelkam using the chemical input control; (17) Corrosion, operating experiences and process improvements to increase the availability and operating time of the biomass power plant Timelkam; (18) The influence of temperature on the measurement of the conductivity of highly diluted solutions; (19) A multiparameter instrumentation approach

  3. Application of artificial intelligence for nuclear power plant surveillance and diagnosis problems

    International Nuclear Information System (INIS)

    Monnier, B.; Ricard, B.; Doutre, J.L.; Martin-Mattei, C.; Fernandes, A.

    1991-01-01

    This paper presents three expert systems in the field of surveillance and diagnosis of nuclear power plants. Each application is described from the point of view of knowledge modeling. Then, a general knowledge model is proposed for a class of diagnosis problems. At the end, the paper shows the future frame of the surveillance of the nuclear power plant main components at EDF in which the greatest part of those expert systems will run

  4. Investigation of organizational structures of nuclear power plants and their cooperation with superordinate organizational structures. Phase 2

    International Nuclear Information System (INIS)

    1989-01-01

    This study gives an overview about the interaction of the German nuclear power industry and other (superior) organisations like supervising agencies, expert organisations and other nuclear power plants, nuclear power plant owners or their associations. The interactions of nuclear power plants with other organisations is partly regulated by law. This is particularly true for the interaction between the nuclear power plants and the supervising agencies respectively the expert organisations. Among one another, the interaction of nuclear power plants is mainly carried out as a voluntary exchange of experience. The task of the study is to analyse the complex patterns of interactions among nuclear power plants and other organisations in detail and to demonstrate the trends of further improvements. Thus, the study does demonstrate the different kinds of interaction between nuclear power plants among another, between nuclear power plants and their supervising agencies and between nuclear power plants and expert organisations. These interactions are evaluated with regard to the existing regulation. (orig.) [de

  5. Crew resource management training adapted to nuclear power plant operators for enhancing safety attitude

    International Nuclear Information System (INIS)

    Ishibashi, Akira; Kitamura, Masaharu; Takahashi, Makoto

    2015-01-01

    A conventional training program for nuclear power plant operators mainly focuses on the improvement of knowledge and skills of individual operators. Although it has certainly contributed to safety operation of nuclear power plants, some recent incidents have indicated the necessity of an additional training program aiming at the improvement of team performance. In the aviation domain, crew resource management (CRM) training has demonstrated the effectiveness in resolving team management issues of flight crews, aircraft maintenance crews, and so on. In the present research, we attempt to introduce the CRM concept into operator training in nuclear power plant for the training of conceptual skill (that is, non-technical skill). In this paper an adapted CRM training for nuclear power plant operators is proposed. The proposed training method has been practically utilized in the training course of the managers of nuclear power plants. (author)

  6. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  7. The human factor in operating nuclear power plants during crisis situations

    International Nuclear Information System (INIS)

    Schnauder, H.; Smidt, D.

    1981-10-01

    Human factors in nuclear power plant operation are a main part of safety analyses. A considerable reduction in the influence of human factors has been obtained through ergonomic control room design, automation, clearly formulated operating manuals, and appropriate personnel education and training. These precautions are directed primarily at skill- and rule-based behaviour and are intended for normal operation and design accidents. In addition, one can construct an area of uncommon and very rare events where a partial failure of the safety systems is assumed. This is an area of knowledge-based behaviour. This report describes and assesses the present situation in German nuclear power plants. Recommendations for further research activity are made and, as a main result, for improvements in knowledge-based behaviour. (orig.) [de

  8. Nuclear Power Plants. Revised.

    Science.gov (United States)

    Lyerly, Ray L.; Mitchell, Walter, III

    This publication is one of a series of information booklets for the general public published by the United States Atomic Energy Commission. Among the topics discussed are: Why Use Nuclear Power?; From Atoms to Electricity; Reactor Types; Typical Plant Design Features; The Cost of Nuclear Power; Plants in the United States; Developments in Foreign…

  9. Elecnuc. Nuclear power plants in the world; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. These data come from the IAEA's PRIS and AREVA-CEA's GAIA databases. The following aspects are reviewed: 2007 highlights; Main characteristics of reactor types; Map of the French nuclear power plants on 2007/01/01; Worldwide status of nuclear power plants (12/31/2007); Units distributed by countries; Nuclear power plants connected to the Grid- by reactor type groups; Nuclear power plants under construction on 2007; Evolution of nuclear power plants capacities connected to the grid; First electric generations supplied by a nuclear unit in each country; Electrical generation from nuclear power plants by country at the end 2007; Performance indicator of French PWR units; Evolution of the generation indicators worldwide by type; Nuclear operator ranking according to their installed capacity; Units connected to the grid by countries at 12/31/2007; Status of licence renewal applications in USA; Nuclear power plants under construction at 12/31/2007; Shutdown reactors; Exported nuclear capacity in net MWe; Exported and national nuclear capacity connected to the grid; Exported nuclear power plants under construction; Exported and national nuclear capacity under construction; Nuclear power plants ordered at 12/31/2007; Long term shutdown units at 12/31/2007; COL (combined licences) applications in the USA; Recycling of Plutonium in reactors and experiences; Mox licence plants projects; Appendix - historical development; Meaning of the used acronyms; Glossary.

  10. Nuclear power plants and the environment

    Energy Technology Data Exchange (ETDEWEB)

    Barabas, K [Ceskoslovenska Komise pro Atomovou Energii, Prague

    1978-05-01

    The environmental impacts are compared of conventional coal-fired and oil-fired power plants and of nuclear power plants. The values are compared of SO/sub 2/, NO/sub 2/, ash and soot emissions with /sup 133/Xe and /sup 85/Kr fission products release and the requirement for air for diluting these emissions in the atmosphere is assessed. Also compared are thermal pollution from an oil-fired power plant and from PWR and fast reactor power plants. The conclusion is arrived at that nuclear energy can solve the problem of increasing demand for electric and heat power while reducing negative environmental impacts.

  11. Nuclear power plants and the environment

    International Nuclear Information System (INIS)

    Barabas, K.

    1978-01-01

    The environmental impacts are compared of conventional coal-fired and oil-fired power plants and of nuclear power plants. The values are compared of SO 2 , NO 2 , ash and soot emmisions with 133 Xe and 85 Kr fission products release and the requirement for air for diluting these emissions in the atmosphere is assessed. Also compared are thermal pollution from an oil-fired power plant and from PWR and fast reactor power plants. The conclusion is arrived at that nuclear energy can solve the problem of increasing demand for electric and heat power while reducing negative environmental impacts. (O.K.)

  12. HVDC transmission from nuclear power plant

    International Nuclear Information System (INIS)

    Yoshida, Yukio; Takenaka, Kiyoshi; Taniguchi, Haruto; Ueda, Kiyotaka

    1980-01-01

    HVDC transmission directly from a nuclear power plant is expected as one of the bulk power transmission systems from distant power generating area. Successively from the analysis of HVDC transmission from BWR-type nuclear power plant, this report discusses dynamic response characteristics of HVDC transmission (double poles, two circuits) from PWR type nuclear power plant due to dc-line faults (DC-1LG, 2LG) and ac-line faults (3LG) near inverter station. (author)

  13. Statistical modeling of an integrated boiler for coal fired thermal power plant.

    Science.gov (United States)

    Chandrasekharan, Sreepradha; Panda, Rames Chandra; Swaminathan, Bhuvaneswari Natrajan

    2017-06-01

    The coal fired thermal power plants plays major role in the power production in the world as they are available in abundance. Many of the existing power plants are based on the subcritical technology which can produce power with the efficiency of around 33%. But the newer plants are built on either supercritical or ultra-supercritical technology whose efficiency can be up to 50%. Main objective of the work is to enhance the efficiency of the existing subcritical power plants to compensate for the increasing demand. For achieving the objective, the statistical modeling of the boiler units such as economizer, drum and the superheater are initially carried out. The effectiveness of the developed models is tested using analysis methods like R 2 analysis and ANOVA (Analysis of Variance). The dependability of the process variable (temperature) on different manipulated variables is analyzed in the paper. Validations of the model are provided with their error analysis. Response surface methodology (RSM) supported by DOE (design of experiments) are implemented to optimize the operating parameters. Individual models along with the integrated model are used to study and design the predictive control of the coal-fired thermal power plant.

  14. Development of bus duct inspection robot at nuclear power plant

    International Nuclear Information System (INIS)

    Hamada, Mamoru; Hoshi, Teruaki; Komura, Yoshinari

    2017-01-01

    Under the present situation, nuclear power plant has some places which are inspected with difficulty or not inspected due to narrowness or physical restriction, when carrying out periodical inspection. The subject of our research and development is to improve the accuracy of inspection and also to save labor (liberation from distress work of the worker) by applying a robot technology to the periodical inspection of the nuclear power plant. As a specific example, we report that developed robot can inspect inside the narrow space of Isolated Phase Bus ducts, which connect between a turbine generator and the main transformer. (author)

  15. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  16. Automatic coal sampling for thermoelectric power plants. Some remarks on moisture

    Energy Technology Data Exchange (ETDEWEB)

    Tanzi, M.

    1983-06-01

    The following topics are discussed: coal sampling and reference standards; coal moisture and sampling; main technical data of the coal sampling station built for the EWEL power plant in Brindisi, Italy.

  17. Dynamic analysis of Boushehr Nuclear Power Plant in connected to grid system

    International Nuclear Information System (INIS)

    Karimi Fard, A.

    1999-01-01

    Models of generating with the pressurized water reactor (PWR) have been developed for simulating. the plant dynamics under system disturbances. These models include power plant, energy sources, turbine, transmission system and control system such as Avr and govern and other local control devices. Simulink toolbox of Matlab software is used for simulations. The study is mainly based on the Bushehr Nuclear Power Plants (BNPP) parameters. Assuming that BNPP is connected to infinite bus with double tie line. Four cases are studied to examine the internal dynamic behavior of BNPP. First and second cases are used to load following studies in nuclear power plant. Another cases are used to study the dynamic behavior after short circuit fault and line outages in transmission systems. The results discussed in the thesis

  18. Operating experience feedback on lose of offsite power supply for nuclear power plant

    International Nuclear Information System (INIS)

    Jiao Feng; Hou Qinmai; Che Shuwei

    2013-01-01

    The function of the service power system of a nuclear power plant is to provide safe and reliable power supply for the nuclear power plant facilities. The safety of nuclear power plant power supply is essential for nuclear safety. The serious accident of Fukushima Daiichi nuclear power plant occurred due to loss of service power and the ultimate heat sink. The service power system has two independent offsite power supplies as working power and auxiliary power. This article collected events of loss of offsite power supply in operating nuclear power plants at home and abroad, and analyzed the plant status and cause of loss of offsite power supply events, and proposed improvement measures for dealing with loss of offsite power supply. (authors)

  19. Policy planning for nuclear power: an overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1995-05-01

    The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. (NHA)

  20. Report on countermeasure to plant life management of the nuclear power plants at three electric power companies

    International Nuclear Information System (INIS)

    1999-01-01

    Three nuclear power reactors of the Fukushima-1 nuclear power plant, the Mihama-1 power plant and the Tsuruga-1 power plant were investigated according to the estimation plan shown in the Fundamental Concept on Plant Life Management of Agency of Natural Resources and Energy, Ministry of International Trade and Industry on April, 1996. Their reports contained the technical evaluation against, the responsive items to and the future examinations of the plant life management. In special, in the responsive items, some items to be added to the present maintenance process and some technical developmental problems are described in details and concretely. (G.K.)

  1. Evaluating and improving nuclear power plant operating performance

    International Nuclear Information System (INIS)

    1999-07-01

    This report aims to provide the basis for improvements in the understanding of nuclear power plants operation and ideas for improving future productivity. The purpose of the project was to identify good practices of operating performance at a few of the world's most productive plants. This report was prepared through a series of consultants meetings, a specialists meeting and an Advisory Group meeting with participation of experts from 23 Member States. The report is based on self-assessment of half a dozen plants that have been chosen as representatives of different reactor types in as many different countries, and the views and assessment of the participants on good practices influencing plant performance. Three main areas that influence nuclear power plant availability and reliability were identified in the discussions: (1) management practices, (2) personnel characteristics, and (3) working practices. These areas cover causes influencing plant performance under plant management control. In each area the report describes factors or good practices that positively influence plant availability. The case studies, presented in annexes, contain the plant self-assessment of areas that influence their availability and reliability. Six plants are represented in the case studies: (1) Dukovany (WWER, 1760 MW) in the Czech Republic; (2) Blayais (PWR, 3640 MW) in France; (3) Paks (WWER, 1840 MW) in Hungary; (4) Wolsong 1 (PHWR, 600 MW) in the Republic of Korea; (5) Trillo 1 (PWR, 1066 MW) in Spain; and (6) Limerick (BWR, 2220 MW) in the United States of America

  2. Turbine-generators for 400 mw coal-fired power plants

    International Nuclear Information System (INIS)

    Engelke, W.; Bergmann, D.; Boer, J.; Termuehlen, H.

    1991-01-01

    This paper reports that presently, standard coal-fired power plant concepts including flue gas desulfurization (FGD) and DENO x systems are in the design stage to be built on relatively short delivery schedules. The rating in the 400 MW range has generally been selected, because such small power plant units with short delivery times cause a minimum financial burden during planning, delivery and installation. They also follow more closely the growth of electric energy demand at specific locations. However economical considerations could lead to larger unit ratings, since the planning and building process of higher capacity plants is not significantly different but specific plant costs are certainly smaller with increased unit size. Historically large tandem-compound steam turbine-generators have been built and have proven reliable operation with ratings in excess of 800 MW. Already in the late 1950's main steam pressures and temperatures as high as 4,500 psig and 1,200 degrees F respectively were successfully used for smaller steam turbines

  3. FY 2000 report on the development of hydrothermal use power plant, etc. Development of the binary cycle power plant (Development of a 10MW class plant); 2000 nendo Nessui riyo hatsuden plant tou kaihatsu. Bainari cycle hatsuden plant no kaihatsu - 10MW kyu plant no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    For the purpose of developing a 10MW class demonstrative plant for geothermal binary power generation, the R and D were carried out, and the results obtained from FY 1995 to FY 1999 were summed up. In the interim evaluation made in July 1994, study was to be phasedly proceeded with for the main three systems (hydrothermal system, medium system and power generation system) which compose the 10MW class binary cycle power plant. The test on the hydrothermal system was started in FY 1995. In the R and D, the following were conducted for evaluation: design/manufacture/installation of the test device for the hydrothermal system, manufacture of demonstrative downhole pump (DHP) No.3 and test at plant, test on the hydrothermal system. As to the turbine working medium suitable for binary power plant, the specified freon/substitute freon have been used, but it seems that hydrocarbons such as butane and pentane can be effective in future. In the study of the economical efficiency, it was pointed out that for the commercialization, it is important to improve durability of DHP and further reduce the cost of DHP equipment and cost of repairs. (NEDO)

  4. Energetic and exergetic analysis of a steam turbine power plant in an existing phosphoric acid factory

    International Nuclear Information System (INIS)

    Hafdhi, Fathia; Khir, Tahar; Ben Yahyia, Ali; Ben Brahim, Ammar

    2015-01-01

    Highlights: • The operating mode of the factory and the power supply streams are presented. • Energetic Analysis of steam turbine power plant of an existing phosphoric acid factory. • Exergetic Analysis of each component of steam turbine power plant and the different heat recovery system. • Energy, exergy efficiency and irreversibility rates for the main components are determined. • The effect of the operating parameters on the plant performance are analyzed. - Abstract: An energetic and exergetic analysis is conducted on a Steam Turbine Power Plant of an existing Phosphoric Acid Factory. The heat recovery systems used in the different parts of the plant are also considered in the study. Mass, energy and exergy balances are established on the main compounds of the plant. A numerical code is established using EES software to perform the calculations required for the thermal and exergy plant analysis considering real variation ranges of the main operating parameters such as pressure, temperature and mass flow rate. The effects of theses parameters on the system performances are investigated. The main sources of irreversibility are the melters, followed by the heat exchangers, the steam turbine generator and the pumps. The maximum energy efficiency is obtained for the blower followed by the heat exchangers, the deaerator and the steam turbine generator. The exergy efficiency obtained for the heat exchanger, the steam turbine generator, the deaerator and the blower are 88%, 74%, 72% and 66% respectively. The effects of High Pressure steam temperature and pressure on the steam turbine generator energy and exergy efficiencies are investigated.

  5. RENAP-MP: national PWR - medium nuclear power plant

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Yamaguchi, M.; Kosaka, N.; Moreira, J.M.L.

    1994-01-01

    In this work are presented the main characteristics of a medium nuclear power plant, named RENAP - MP which has been developed by the Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN - SP) and Coordenadoria para Projetos Especiais (COPESP) from de Brazilian Navy. The study aims at determining the necessary conditions for such a plant complete, in Brazil, technically and economically with other means of thermal power generation, such as coal, gas and oil. Results show that the energy average cost should be around 59 dollars/MWh; the construction time should be less than 5 years in order to reduce financial costs; and the design should emphasize the use of inherently safe technology, in order to reduce substantially the risks of nuclear accidents. It should be pointed out that the nuclear power technology has some environmental and social advantages when compared to hydro and other thermal power technologies, since it does not require flooding of large areas, reduces green house and acid rain effects, and can be located near consumption areas. (author). 11 refs, 5 tabs

  6. Control strategies of atmospheric mercury emissions from coal-fired power plants in China.

    Science.gov (United States)

    Tian, Hezhong; Wang, Yan; Cheng, Ke; Qu, Yiping; Hao, Jiming; Xue, Zhigang; Chai, Fahe

    2012-05-01

    Atmospheric mercury (Hg) emission from coal is one of the primary sources of anthropogenic discharge and pollution. China is one of the few countries in the world whose coal consumption constitutes about 70% of total primary energy, and over half of coals are burned directly for electricity generation. Atmospheric emissions of Hg and its speciation from coal-fired power plants are of great concern owing to their negative impacts on regional human health and ecosystem risks, as well as long-distance transport. In this paper, recent trends of atmospheric Hg emissions and its species split from coal-fired power plants in China during the period of 2000-2007 are evaluated, by integrating each plant's coal consumption and emission factors, which are classified by different subcategories of boilers, particulate matter (PM) and sulfur dioxide (SO2) control devices. Our results show that the total Hg emissions from coal-fired power plants have begun to decrease from the peak value of 139.19 t in 2005 to 134.55 t in 2007, though coal consumption growing steadily from 1213.8 to 1532.4 Mt, which can be mainly attributed to the co-benefit Hg reduction by electrostatic precipitators/fabric filters (ESPs/FFs) and wet flue gas desulfurization (WFGD), especially the sharp growth in installation of WFGD both in the new and existing power plants since 2005. In the coming 12th five-year-plan, more and more plants will be mandated to install De-NO(x) (nitrogen oxides) systems (mainly selective catalytic reduction [SCR] and selective noncatalytic reduction [SNCR]) for minimizing NO(x) emission, thus the specific Hg emission rate per ton of coal will decline further owing to the much higher co-benefit removal efficiency by the combination of SCR + ESPs/FFs + WFGD systems. Consequently, SCR + ESPs/FFs + WFGD configuration will be the main path to abate Hg discharge from coal-fired power plants in China in the near future. However advanced specific Hg removal technologies are necessary

  7. Automation technology in power plants

    International Nuclear Information System (INIS)

    Essen, E.R.

    1995-01-01

    In this article a summery of the current architecture of modern process control systems in power plants and future trends have been explained. The further development of process control systems for power plants is influenced both by the developments in component and software technologies as well as the increased requirements of the power plants. The convenient and low cost configuration facilities of new process control systems have now reached a significance which makes it easy for customers to decide to purchase. (A.B.)

  8. Analysis of the alternatives for the chemical treatment of the secondary circuit of PWR power plants

    International Nuclear Information System (INIS)

    Lopes, J.P.G.; Silva Neto, A.J. da; Braganca Junior, A.; Dominguez, D.

    1990-01-01

    The operational experiences within PWR power plants shows that the major problems which affect the plant availability occurs in the secondary side, mainly in the steam generators and condenser. The aim of this report is to perform an evaluation of the main chemical treatment processes, which are applied to the secondary side of PWR power plants in order to reduce the corrosion problems to which are exposed the system equipment, minimizing in this way the shut down and maintenance cost for repairs and replacement of damaged components. (author)

  9. Design measures to facilitate implementation of safeguards at future water cooled nuclear power plants

    International Nuclear Information System (INIS)

    1999-01-01

    The report is intended to present guidelines to the State authorities, designers and prospective purchasers of future water cooled power reactors which, if taken into account, will minimize the impact of IAEA safeguards on plant operation and ensure efficient and effective acquisition of safeguards data to the mutual benefit of the Member State, the plant operator and the IAEA. These guidelines incorporate the IAEA's experience in establishing and carrying out safeguards at currently operating nuclear power plants, the ongoing development of safeguards techniques and feedback of experience from plant operators and designers on the impact of IAEA safeguards on plant operation. The following main subjects are included: The IAEA's safeguards function for current and future nuclear power plants; summary of the political and legal foundations of the IAEA's safeguards system; the technical objective of safeguards and the supply and use of required design information; safeguards approaches for nuclear power plants; design implications of experience in safeguarding nuclear power plants and guidelines for future water cooled reactors to facilitate the implementation of safeguards

  10. Remanent life management of nuclear power plants

    International Nuclear Information System (INIS)

    Pinedo, J.; Gomez Santamaria, J.

    1995-01-01

    The concept of life in the nuclear power plants is very special. The main aceptions are: design life, economic life and useful life. The good management of NPP will do the prolongation of the life in the NPP. The remanent of management life summarizes certain activities in order to prolong the lifetime of the NPP. This article presents the activities of the RML program, the technological program and its benefits

  11. Design and Tuning Methodology of Active Power Controller in Wind Power Plants

    DEFF Research Database (Denmark)

    Ionita, Claudiu; Raducu, Alin George; Iov, Florin

    2017-01-01

    This paper presents a method to design and tune the main controller of a Wind Power Plant (WPP), with focus on the active power and frequency control. The controller requirements are based on the Danish grid codes. The controller functionality is successfully verified using the model and the layout...... of an actual WPP rated at 160 MW, that consists of 80 wind turbines. Two reference dispatch strategies are investigated, equal and proportional. The proportional dispatch is preferred due to better tracking accuracy and robustness. The work described in this article is meant to help WPP developers...

  12. ELECNUC. Nuclear power plants in the world - 2012 edition, Status on 2011-12-31

    International Nuclear Information System (INIS)

    2012-01-01

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. Data come from the IAEA's PRIS database and from specific I-tese studies. The following aspects are reviewed: 2011 highlights; Main characteristics of reactor types; Map of the French nuclear power plants on 2011/01/01; Worldwide status of nuclear power plants (12/31/2011); Units distributed by countries; Nuclear power plants connected to the Grid- by reactor type groups; Nuclear power plants under construction on 2011; Evolution of nuclear power plants capacities connected to the grid; First electric generations supplied by a nuclear unit in each country; Electrical generation from nuclear powe plants by country at the end 2011; Performance indicator of french PWR units; Evolution of the generation indicators worldwide by type; Nuclear operator ranking according to their installed capacity; Units connected to the grid by countries at 12/31/2011; Status of licence renewal applications in USA; Nuclear power plants under construction at 12/31/2011; Shutdown reactors; Exported nuclear capacity in net MWe; Exported and national nuclear capacity connected to the grid; Exported nuclear power plants under construction; Exported and national nuclear capacity under construction; Nuclear power plants ordered at 12/31/2011; Long term shutdown units at 12/31/2011; COL (Combined Licence) applications in the USA; Recycling of Plutonium in reactors and experiences; Mox licence plants projects; Appendix - historical development; Meaning of the used acronyms; Glossary

  13. Power control strategy of a photovoltaic power plant for microgrid applications

    Energy Technology Data Exchange (ETDEWEB)

    Li, Peng [Ecole Centrale de Lille, Cite Scientifique, Villeneuve d' Ascq (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP); Ecole Nationale Superieure d' Arts et Metiers, Lille (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP); Francois, Bruno [Ecole Centrale de Lille, Cite Scientifique, Villeneuve d' Ascq (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP); Degobert, Philippe [Ecole Nationale Superieure d' Arts et Metiers, Lille (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP); Robyns, Benoit [Hautes Etudes d' Ingenieur, Lille (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP)

    2008-07-01

    Photovoltaic power plants operates currently maximal power point tracking (MPPT). For microgrid applications, however, a PV power plant can not operate in the MPPT mode in all conditions. When a microgrid is islanded from the grid with few loads, a limitation of the produced power by PV plants is required and prescribed by the Distribution System Operator. This paper proposes a power control technique integrated into a dynamic model of a PV power plant by using equivalent continuous models of power electronic converters. The power limitation mode of the PV is performed by applying the correct PV terminal voltage, which corresponds to the prescribed power reference. The proposed global model is validated by simulations with the help of Matlab-Simulink trademark. (orig.)

  14. A nuclear power plant status monitor

    International Nuclear Information System (INIS)

    Chu, B.B.; Conradi, L.L.; Weinzimmer, F.

    1986-01-01

    Power plant operation requires decisions that can affect both the availability of the plant and its compliance with operating guidelines. Taking equipment out of service may affect the ability of the plant to produce power at a certain power level and may also affect the status of the plant with regard to technical specifications. Keeping the plant at a high as possible production level and remaining in compliance with the limiting conditions for operation (LCOs) can dictate a variety of plant operation and maintenance actions and responses. Required actions and responses depend on the actual operational status of a nuclear plant and its attendant systems, trains, and components which is a dynamic situation. This paper discusses an Electric Power Research Institute (EPRI) Research Project, RP 2508, the objective of which is to combine the key features of plant information management systems with systems reliability analysis techniques in order to assist nuclear power plant personnel to perform their functions more efficiently and effectively. An overview of the EPRI Research Project is provided along with a detailed discussion of the design and operation of the PSM portion of the project

  15. Cooperation of nuclear, thermal and hydroelectric power plants in the power system

    International Nuclear Information System (INIS)

    1984-01-01

    The conference heard 36 papers of which 23 were incorporated in INIS. The subjects discussed were: the development of power industry in Czechoslovakia, methods of statistical analysis of data regarding nuclear power plant operation, the incorporation of WWER nuclear power plants in the power supply system, the standardization of nuclear power plants, the service life of components, use of nuclear energy sources, performance of the reactor accident protection system, the use of nuclear power and heating plants in Hungary, risk analysis, optimization of nuclear power plants, accidents caused by leakage of the primary and secondary circuit. (J.P.)

  16. Assessment of RELAP5/MOD2 against a main feedwater turbopump trip transient in the Vandellos II Nuclear Power Plant

    International Nuclear Information System (INIS)

    Llopis, C.; Casals, A.; Perez, J.; Mendizabal, R.

    1993-12-01

    The Consejo de Seguridad Nuclear (CSN) and the Asociacion Nuclear Vandellos (ANV) have developed a model of Vandellos II Nuclear Power Plant. The ANV collaboration consisted in the supply of design and actual data, the cooperation in the simulation of the control systems and other model components, as well as in the results analysis. The obtained model has been assessed against the following transients occurred in plant: A trip from the 100% power level (CSN); a load rejection from 100% to 50% (CSN); a load rejection from 75% to 65% (ANV); and, a feedwater turbopump trip (ANV). This copy is a report of the feedwater turbopump trip transient simulation. This transient actually occurred in the plant on June 19, 1989

  17. Economic analysis of nuclear power plant for decision making in Thailand

    International Nuclear Information System (INIS)

    Siri-Udomrat, Thawee

    2002-01-01

    According to National Economic and Social Development's forecast, electricity demand in Thailand from now up to the year 2011 will rise more than 147 %. So, the Eighth-Ninth National Economic and Social Development Plans (NESDP) (1997-2006) has launched the main energy resources, imported oil, coal, imported coal, natural gas and hydro. From the Tenth NESDP up (2007-) may launch the energy option more, such as liquid natural gas and nuclear. Although Thailand has reserved lignite and natural gas enough for more than two centuries, we have found that the energy resources are inadequate and expected to be imported for over 60%. So nuclear energy is necessary and suitable for alternative source of energy. The main factors used for power generating cost calculation of nuclear power plant are capital investment cost, nuclear fuel cycle cost, operation and maintenance cost, and infrastructure cost. Consequently, the parameter which indicating the performance of power plant and power generation cost are load factor, net power rating, and economic life. Another variable group are interest rate, escalation rate, and discount rate. The overhead and operation cost are always changed due to the economic or other variants of interest rate, and out of schedule operation or the changing of fuel cost. In order to compare each type of power plant, we had to use present worth value analytical technique to calculate the the levelized energy cost (mills/kWh) by giving present worth value of average power generation cost equal to present worth value of total cost of the project and operation of power plant. The economic parameter will affect exchange rate and discount rate calculation. To assess the economic analysis of cost and cost benefit of Electricity Generating Authority of Thailand (EGAT) project, real interest rate for discount rate (social discount rate) will be calculated. By the year 1992-1998, the social discount rate of Thailand is estimated at about 7.59%. For studying

  18. Summary of nuclear power plant construction

    International Nuclear Information System (INIS)

    Tamura, Saburo

    1973-01-01

    Various conditions for the construction of nuclear power plants in Japan without natural resources were investigated. Expansion of the sites of plants, change of reactor vessels, standardization of nuclear power plants, possiblity of the reduction of construction period, approaching of nuclear power plants to consuming cities, and group construction were studied. Evaluation points were safety and economy. Previous sites of nuclear power plants were mostly on plane ground or cut and enlarge sites. Proposals for underground or offshore plants have been made. The underground plants were made at several places in Europe, and the ocean plant is now approved in U.S.A. as a plant on a man-made island. Vessels for containing nuclear reactors are the last barriers to the leakage of radioactive substance. At the initial period, the vessels were made of steel, which were surrounded by shielding material. Those were dry well type containers. Then, vessel type changed to pressure-suppression type wet containers. Now, it tends to concrete (PC or RC) type containers. There is the policy on the standardization of nuclear power plants by U.S.A.E.C. in recent remarkable activity. The merit and effect of the standardization were studied, and are presented in this paper. Cost of the construction of nuclear power plants is expensive, and interest of money is large. Then, the reduction of construction period is an important problem. The situations of plants approaching to consuming cities in various countries were studied. Idea of group construction is described. (Kato, T.)

  19. ECONOMICS AND FEASIBILITY OF RANKINE CYCLE IMPROVEMENTS FOR COAL FIRED POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Richard E. Waryasz; Gregory N. Liljedahl

    2004-09-08

    ALSTOM Power Inc.'s Power Plant Laboratories (ALSTOM) has teamed with the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL), American Electric Company (AEP) and Parsons Energy and Chemical Group to conduct a comprehensive study evaluating coal fired steam power plants, known as Rankine Cycles, equipped with three different combustion systems: Pulverized Coal (PC), Circulating Fluidized Bed (CFB), and Circulating Moving Bed (CMB{trademark}). Five steam cycles utilizing a wide range of steam conditions were used with these combustion systems. The motivation for this study was to establish through engineering analysis, the most cost-effective performance potential available through improvement in the Rankine Cycle steam conditions and combustion systems while at the same time ensuring that the most stringent emission performance based on CURC (Coal Utilization Research Council) 2010 targets are met: > 98% sulfur removal; < 0.05 lbm/MM-Btu NO{sub x}; < 0.01 lbm/MM-Btu Particulate Matter; and > 90% Hg removal. The final report discusses the results of a coal fired steam power plant project, which is comprised of two parts. The main part of the study is the analysis of ten (10) Greenfield steam power plants employing three different coal combustion technologies: Pulverized Coal (PC), Circulating Fluidized Bed (CFB), and Circulating Moving Bed (CMB{trademark}) integrated with five different steam cycles. The study explores the technical feasibility, thermal performance, environmental performance, and economic viability of ten power plants that could be deployed currently, in the near, intermediate, and long-term time frame. For the five steam cycles, main steam temperatures vary from 1,000 F to 1,292 F and pressures from 2,400 psi to 5,075 psi. Reheat steam temperatures vary from 1,000 F to 1,328 F. The number of feedwater heaters varies from 7 to 9 and the associated feedwater temperature varies from 500 F to 626 F. The main part of the

  20. Nuclear power plant

    International Nuclear Information System (INIS)

    Orlov, V.V.; Rineisky, A.A.

    1975-01-01

    The invention is aimed at designing a nuclear power plant with a heat transfer system which permits an accelerated fuel regeneration maintaining relatively high initial steam values and efficiency of the steam power circuit. In case of a plant with three circuits the secondary cooling circuit includes a steam generator with preheater, evaporator, steam superheater and intermediate steam superheater. At the heat supply side the latter is connected with its inlet to the outlet of the evaporator and with its outlet to the low-temperature side of the secondary circuit

  1. Model for the techno-economic analysis of common work of wind power and CCGT power plant to offer constant level of power in the electricity market

    Science.gov (United States)

    Tomsic, Z.; Rajsl, I.; Filipovic, M.

    2017-11-01

    Wind power varies over time, mainly under the influence of meteorological fluctuations. The variations occur on all time scales. Understanding these variations and their predictability is of key importance for the integration and optimal utilization of wind in the power system. There are two major attributes of variable generation that notably impact the participation on power exchanges: Variability (the output of variable generation changes and resulting in fluctuations in the plant output on all time scales) and Uncertainty (the magnitude and timing of variable generation output is less predictable, wind power output has low levels of predictability). Because of these variability and uncertainty wind plants cannot participate to electricity market, especially to power exchanges. For this purpose, the paper presents techno-economic analysis of work of wind plants together with combined cycle gas turbine (CCGT) plant as support for offering continues power to electricity market. A model of wind farms and CCGT plant was developed in program PLEXOS based on real hourly input data and all characteristics of CCGT with especial analysis of techno-economic characteristics of different types of starts and stops of the plant. The Model analyzes the followings: costs of different start-stop characteristics (hot, warm, cold start-ups and shutdowns) and part load performance of CCGT. Besides the costs, the technical restrictions were considered such as start-up time depending on outage duration, minimum operation time, and minimum load or peaking capability. For calculation purposes, the following parameters are necessary to know in order to be able to economically evaluate changes in the start-up process: ramp up and down rate, time of start time reduction, fuel mass flow during start, electricity production during start, variable cost of start-up process, cost and charges for life time consumption for each start and start type, remuneration during start up time regarding

  2. ANALYSIS OF SUFFICIENCY OF THE BEARING CAPACITY OF BUILDING STRUCTURES OF OPERATING SITES OF MAIN BUILDINGS OF THERMAL POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Alekseeva Ekaterina Leonidovna

    2012-10-01

    Full Text Available Upon examination of eleven main buildings of power plants, analysis of defects and damages of building structures was performed. Thereafter, the damageability of principal bearing structures of main buildings of thermal plants was analyzed. It was identified that the fastest growing defects and damages were concentrated in the structures of operating sites. The research of the rate of development of the most frequent damages and defects made it possible to conclude that internal corrosion of the reinforcing steel was the most dangerous defect, as far as the reinforced concrete elements of operating sites were concerned. Methods of mathematical statistics were applied to identify the reinforcing steel development pattern inside reinforced concrete elements of floors of operating sites. It was identified that the probability of corrosion of reinforced concrete elements of operating sites was distributed in accordance with the demonstrative law. Based on these data, calculation of strength of reinforced concrete slabs and metal beams was performed in terms of their regular sections, given the natural loads and the realistic condition of structures. As a result, dependence between the bearing capacity reserve ratio and the corrosion development pattern was identified for reinforced concrete slabs and metal beams of operating sites. In order to analyze the sufficiency of the bearing capacity of building structures of operating sites in relation to their time in commission, equations were derived to identify the nature of dependence between the sufficiency of the bearing capacity of reinforced concrete slabs and metal beams of the operating sites and their time in commission.

  3. Optimum gas turbine cycle for combined cycle power plant

    International Nuclear Information System (INIS)

    Polyzakis, A.L.; Koroneos, C.; Xydis, G.

    2008-01-01

    The gas turbine based power plant is characterized by its relatively low capital cost compared with the steam power plant. It has environmental advantages and short construction lead time. However, conventional industrial engines have lower efficiencies, especially at part load. One of the technologies adopted nowadays for efficiency improvement is the 'combined cycle'. The combined cycle technology is now well established and offers superior efficiency to any of the competing gas turbine based systems that are likely to be available in the medium term for large scale power generation applications. This paper has as objective the optimization of a combined cycle power plant describing and comparing four different gas turbine cycles: simple cycle, intercooled cycle, reheated cycle and intercooled and reheated cycle. The proposed combined cycle plant would produce 300 MW of power (200 MW from the gas turbine and 100 MW from the steam turbine). The results showed that the reheated gas turbine is the most desirable overall, mainly because of its high turbine exhaust gas temperature and resulting high thermal efficiency of the bottoming steam cycle. The optimal gas turbine (GT) cycle will lead to a more efficient combined cycle power plant (CCPP), and this will result in great savings. The initial approach adopted is to investigate independently the four theoretically possible configurations of the gas plant. On the basis of combining these with a single pressure Rankine cycle, the optimum gas scheme is found. Once the gas turbine is selected, the next step is to investigate the impact of the steam cycle design and parameters on the overall performance of the plant, in order to choose the combined cycle offering the best fit with the objectives of the work as depicted above. Each alterative cycle was studied, aiming to find the best option from the standpoint of overall efficiency, installation and operational costs, maintainability and reliability for a combined power

  4. Pre-feasibility study for an electric power plant based on rice straw. [Mali

    Energy Technology Data Exchange (ETDEWEB)

    Fock, F. [Ea Energy Analysis, Copenhagen (Denmark); Nygaard, I. [Technical Univ. of Denmark. DTU Management Engineering, UNEP Risoe Centre on Energy, Climate and Sustainable Development, Roskilde (Denmark); Maiga, A.; Kone, B.; Kamissoko, F.; Coulibaly, N.; Ouattara, O.

    2012-11-15

    The main objective is to make a first evaluation regarding if it's technically possible, economically viable, sustainable and recommendable to build a rice straw/hulls fired power plant in Niono in Mali. Based on the available resource of rice straw and the possibilities for connecting to the grid it has been chosen to analyse a 5 MW power plant in the project. For technical reasons the rice straw should be the main fuel, but rice hulls can be used for co-firing. Up to around 20% of the fuel in the plant can be rice hulls instead of rice straw. A number of different biomass power production technologies have been evaluated in the project. This includes: 1) Grate fired boiler. 2) Bubbling fluidised bed. 3) Circulating fluidised bed. 4) Dust fired boiler. 5) Gasification. 6) Stirling engine. 7) Organic Rankine Cycle. Grate firing is the most relevant technology in this case, due to the fuel, the size of the power plant, the demand for electricity only and not heat, the demand for a robust and well proven technology. For a grate fired plant a calculation of the thermodynamic process of the power plant has been carried out in order to determine the electrical efficiency of the plant. The case consists of a 5 MW grate fired power plant with steam turbines and air cooled condenser resulting in an efficiency of 24.6% at full load (20% as yearly average). Investment costs and costs for O and M have been assumed based on experience from Danish power plants but adjusted for local conditions in Mali. The costs for collecting and transporting the rice straw and for the ash disposal have been specifically estimated in this project. The average cost of capital has been estimated based on assumptions on equity, international loans and local loans/bank finance. Based on the investment, the cost of O and M, fuel, ash disposal and the financial assumptions, a cash flow analysis is made in order to calculate the power price resulting in a Net Present Value (NPV) of the

  5. 75 FR 66802 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2010-10-29

    ... Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2; Notice of Withdrawal of...) has granted the request of Calvert Cliffs Nuclear Power Plant, LLC, the licensee, to withdraw its... for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, located in Calvert County, MD. The...

  6. Aging management and preventive maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    Bessho, Toichi; Sagawa, Wataru; Oyamada, Osamu; Uchida, Shunsuke

    1995-01-01

    It is expected that nuclear power generation will bear main electric power supply for long term. For this purpose, by applying proper preventive maintenance to the nuclear power plants in operation, the maintenance of high reliability and the rate of plant operation is extremely important. Especially it has been strongly demanded to execute efficiently the periodic inspection which is carried out every year to shorten its period and increase the rate of operation, and to maintain the reliability by the proper maintenance for the aged plants with long operation years. As to efficient and short periodic inspection, the preparation is advanced by the guidance of electric power companies aiming at realizing it in nearest fiscal year, and further, effort is exerted for the development of technology in long term to optimize periodic inspection. For securing the reliability of aged plants, it is important to do proper inspection and diagnosis and to take the countermeasures by repair and replacement, based on the grasp of secular change mechanism and the evaluation of life of machinery, equipment and materials. In particular, effort is exerted for the development of maintenance technology for reactor pressure vessels and in-core equipment which are hard to access. The confirmation of the function of remote operation equipment and the establishment of execution condition are carried out by uisng the full scale mock-up of BWR plant. The problems in maintenance service and the activities and results of reliability improvement are reported. (K.I.)

  7. Modern power station practice mechanical boilers, fuel-, and ash-handling plant

    CERN Document Server

    Sherry, A; Cruddace, AE

    2014-01-01

    Modern Power Station Practice, Second Edition, Volume 2: Mechanical (Boilers, Fuel-, and Ash-Handling Plant) focuses on the design, manufacture and operation of boiler units and fuel-and ash-handling plants.This book is organized into five main topics-furnace and combustion equipment, steam and water circuits, ancillary plant and fittings, dust extraction and draught plant, and fuel-and ash-handling plant.In these topics, this text specifically discusses the influence of nature of coal on choice of firing equipment; oil-burner arrangements, ignition and control; disposition of the heating surf

  8. Scope and procedures of fuel management for PWR nuclear power plant

    International Nuclear Information System (INIS)

    Yao Zenghua

    1997-01-01

    The fuel management scope of PWR nuclear power plant includes nuclear fuel purchase and spent fuel disposal, ex-core fuel management, in-core fuel management, core management and fuel assembly behavior follow up. A suit of complete and efficient fuel management procedures have to be created to ensure the quality and efficiency of fuel management work. The hierarchy of fuel management procedure is divided into four levels: main procedure, administration procedure, implement procedure and technic procedure. A brief introduction to the fuel management scope and procedures of PWR nuclear power plant are given

  9. The status of contractors workers operating in US nuclear power plants

    International Nuclear Information System (INIS)

    Lochard, J.

    1985-01-01

    The status of contractors operating in PWRs in the United States is described. The statistics concerning the trends of both the individual and collective exposures of these workers were analysed as well as their main demographic and sociological features. The data relative to the particular group of ''transient'' workers, i.e. those operating in several different power plants during the same year were also examined. The results presented show that the dosimetric and sociological profiles of contractors' workers, in US power plants, do not differ fundamentally from that of permanent workers [fr

  10. VGB Congress 'Power Plants 2006'

    International Nuclear Information System (INIS)

    Anon.

    2006-01-01

    The VGB Congress 'Power Plants' took place in Dresden, 27 th to 29 th September 2006 under the auspices of the Federal Minister for Economics and Technology, Michael Glos. The motto of this year's Congress was 'Future becomes Reality - Investments in New Power Plants'. More than 1,200 participants from Germany and abroad attended the plenary and technical lectures on the topics 'Market and Competition' as well as 'Technology, Operation and Environment' for information and discussion. Special papers were dealing with further issues like 'Generation Market in Europe', 'Clean Power Technology Platform', French policy for new power plants as well as potentials and technology of renewables. (orig.)

  11. Virtual power plant mid-term dispatch optimization

    International Nuclear Information System (INIS)

    Pandžić, Hrvoje; Kuzle, Igor; Capuder, Tomislav

    2013-01-01

    Highlights: ► Mid-term virtual power plant dispatching. ► Linear modeling. ► Mixed-integer linear programming applied to mid-term dispatch scheduling. ► Operation profit maximization combining bilateral contracts and the day-ahead market. -- Abstract: Wind power plants incur practically zero marginal costs during their operation. However, variable and uncertain nature of wind results in significant problems when trying to satisfy the contracted quantities of delivered electricity. For this reason, wind power plants and other non-dispatchable power sources are combined with dispatchable power sources forming a virtual power plant. This paper considers a weekly self-scheduling of a virtual power plant composed of intermittent renewable sources, storage system and a conventional power plant. On the one hand, the virtual power plant needs to fulfill its long-term bilateral contracts, while, on the other hand, it acts in the market trying to maximize its overall profit. The optimal dispatch problem is formulated as a mixed-integer linear programming model which maximizes the weekly virtual power plant profit subject to the long-term bilateral contracts and technical constraints. The self-scheduling procedure is based on stochastic programming. The uncertainty of the wind power and solar power generation is settled by using pumped hydro storage in order to provide flexible operation, as well as by having a conventional power plant as a backup. The efficiency of the proposed model is rendered through a realistic case study and analysis of the results is provided. Additionally, the impact of different storage capacities and turbine/pump capacities of pumped storage are analyzed.

  12. Space power plants and power-consuming industrial systems

    International Nuclear Information System (INIS)

    Latyshev, L.; Semashko, N.

    1996-01-01

    An opportunity to create the space power production on the basis of solar, nuclear and fusion energies is analyzed. The priority of solar power production as the most accessible and feasible in comparison with others is emphasized. However, later on, it probably will play an auxiliary role. The possibilities of fusion power production, as a basic one in future, are also considered. It is necessary to create reactors using the fueling cycle with helium-3 (instead of tritium and deuterium, later on). The reaction products--charged particles, mainly--allow one to organize the system of direct fusion energy conversion into electricity. The produced energy is expected not to be transmitted to Earth, but an industry in space is expected to be produced on its basis. The industrial (power and science-consuming) objects located on a whole number of space apparatus will form a single complex with its own basic power plant. The power transmission within the complex will be realized with high power density fluxes of microwave radiation to short distances with their receivers at the objects. The necessary correction of the apparatus positions in the complex will be done with ion and plasma thrusters. The materials present on the Moon, asteroids and on other planets can serve as raw materials for industrial objects. Such an approach will help to improve the ecological state on Earth, to eliminate the necessity in the fast energy consumption growth and to reduce the hazard of global thermal crisis

  13. Human factors in nuclear power plants

    International Nuclear Information System (INIS)

    Bohr, E.; Hennig, J.; Preuss, W.; Thau, G.

    1977-01-01

    This report describes the results of a study on the functions of operating and maintenance personnel in nuclear power plants. Since an effective power plant design must take into systematic account the possibilities and limitations of the human element, the basic aim of the study was to identify what the human operators are required to do and how they achieve it. Information was acquired by direct observation and by interviews as well as by evaluation of written documents (e.g. incident reports, procedures manuals, work regulations) and of working conditions (e.g. equipment and workplace design). A literature search and evaluation carried out within the scope of this study has been published as a separate document. The main part of the report is devoted to discussions and conclusions on selected areas of potential improvements. The topics include control room design, factors of the physical environment including radiation, problems of maintainability, design of written documents, problems in communicating information, design and control of tasks, placement and training. A separate section deals with problems of recording human errors. (orig.) [de

  14. Labour inspection in nuclear power plant

    International Nuclear Information System (INIS)

    Vallet, J.; Polge, Ch.

    2009-01-01

    The French nuclear safety authority is in charge of labour inspection in nuclear power plants due to historical reasons. Thus, fifteen agents of ASN are acting simultaneously as nuclear inspectors and labour inspectors: they fulfill in the fifty eight reactor operated by EDF. ASN labour inspectors have the same rights ant duties than labour inspectors who fulfill in other French administrations. The regulatory domain is exactly the same. The work of ASN labour inspectors is divided in two main parts checking, on the one hand health and safety regulation requirements and on the other hand, social laws requirements. ASN labour inspectors assume, on their own, most of the decision they have to bring out. Nevertheless, ASN labour inspectors meet each other four times a year in order to share experiences. ASN labour inspectors and nuclear safety inspectors work together in the nuclear power plant. Its the principal benefit of this organisation. A high nu-clear safety level can not be reach without a good work conditions and social dialogue with labour unions. (author)

  15. Nuclear power plants in the world as of June 30, 1982

    International Nuclear Information System (INIS)

    1982-01-01

    In this list of nuclear power plants, the result is summarized when Japan Atomic Industrial Forum, Inc., performed the survey of the nuclear power plants in operation, under construction, ordered and at planning stage in the world, which is the first survey of twice a year. The nuclear power plants in operation in the world were 267, amounting to the total capacity of more than 168 million kWe, those under construction were 243 and more than 232 million kWe, those ordered were 32 and more than 31 million kWe, and those at the planning stage were 137 and more than 138 million kWe. The total was 679 and more than 570 million kWe. In this half year, 3 plants with 2651 MWe capacity started operation, while two shut down plants were removed from the list. The People's Republic of China was added, but Norway was removed, accordingly 41 countries engaged in nuclear power generation. Due to the stagnation of world economy and the relaxation in the demand and supply of petroleum, the future progress of nuclear power generation is uncertain. In light water reactors, the trend toward PWRs in future is observed. FBRs are still slight but tend to increase. The situation of nuclear power generation in Japan and main foreign countries is reported. (Kako, I.)

  16. Feedwater system in a nuclear power plant

    International Nuclear Information System (INIS)

    Shimizu, Tadayuki.

    1975-01-01

    Object: To improve the control property of a steam turbine for a feedwater pump and plant operation characteristics where water is supplied at a low rate. Structure: In a nuclear power plant where feedwater pumps of the reactor are driven by a steam turbine, the main feedwater duct on the discharge side of the feedwater pumps is provided with a cut-off valve and is connected parallel with a bypass duct having a pressure compensated flow control valve. With this arrangement, at the time when the rate of feedwater is high the cut-off valve is open so that water supplied from the feedwater pumps driven by the steam turbine is supplied through the main feedwater duct to the reactor while in case when the rate of feedwater is low the flow control valve is opened to let the water be supplied through the bypass duct. (Kamimura, M.)

  17. Ageing degradation mechanisms in nuclear power plants: lessons learned from operating experience

    International Nuclear Information System (INIS)

    Bieth, M.; Zerger, B.; Duchac, A.

    2014-01-01

    This paper presents main results of a comprehensive study performed by the European Clearinghouse on Operating Experience Feedback of Nuclear Power Plants (NPP) with the support of IRSN (Institut de Surete Nucleaire et de Radioprotection) and GRS (Gesellschaft fuer Anlagen und Reaktorsicherheit mbH). Physical ageing mechanisms of Structures, Systems and Components (SSC) that eventually lead to ageing related systems and components failures at nuclear power plants were the main focus of this study. The analysis of ageing related events involved operating experience reported by NPP operators in France, Germany, USA and to the IAEA/NEA International Reporting System on operating experience for the past 20 years. A list of relevant ageing related events was populated. Each ageing related event contained in the list was analyzed and results of analysis were summarized for each ageing degradation mechanism which appeared to be the dominant contributor or direct cause. This paper provides insights into ageing related operating experience as well as recommendations to deal with the physical ageing of nuclear power plant SSC important to safety. (authors)

  18. Nuclear power plant outages

    International Nuclear Information System (INIS)

    1998-01-01

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls nuclear power plant safety in Finland. In addition to controlling the design, construction and operation of nuclear power plants, STUK also controls refuelling and repair outages at the plants. According to section 9 of the Nuclear Energy Act (990/87), it shall be the licence-holder's obligation to ensure the safety of the use of nuclear energy. Requirements applicable to the licence-holder as regards the assurance of outage safety are presented in this guide. STUK's regulatory control activities pertaining to outages are also described

  19. Replacement of outboard main steam isolation valves in a boiling water reactor plant

    Energy Technology Data Exchange (ETDEWEB)

    Schlereth, J.R.; Pennington, D.

    1996-12-01

    Most Boiling Water Reactor plants utilize wye pattern globe valves for main steam isolation valves for both inboard and outboard isolation. These valves have required a high degree of maintenance attention in order to pass the plant local leakage rate testing (LLRT) requirements at each outage. Northern States Power made a decision in 1993 to replace the outboard valves at it`s Monticello plant with double disc gate valves. The replacement of the outboard valves was completed during the fall outage in 1994. During the spring outage in April of 1996 the first LLRT testing was performed with excellent results. This presentation will address the decision process, time requirements and planning necessary to accomplish the task as well as the performance results and cost effectiveness of replacing these components.

  20. Replacement of outboard main steam isolation valves in a boiling water reactor plant

    International Nuclear Information System (INIS)

    Schlereth, J.R.; Pennington, D.

    1996-01-01

    Most Boiling Water Reactor plants utilize wye pattern globe valves for main steam isolation valves for both inboard and outboard isolation. These valves have required a high degree of maintenance attention in order to pass the plant local leakage rate testing (LLRT) requirements at each outage. Northern States Power made a decision in 1993 to replace the outboard valves at it's Monticello plant with double disc gate valves. The replacement of the outboard valves was completed during the fall outage in 1994. During the spring outage in April of 1996 the first LLRT testing was performed with excellent results. This presentation will address the decision process, time requirements and planning necessary to accomplish the task as well as the performance results and cost effectiveness of replacing these components

  1. Cost-benefit analysis for combined heat and power plant

    International Nuclear Information System (INIS)

    Sazdovski, Ace; Fushtikj, Vangel

    2004-01-01

    The paper presents a methodology and practical application of Cost-Benefit Analysis for Combined Heat and Power Plant (Cogeneration facility). Methodology include up-to-date and real data for cogeneration plant in accordance with the trends ill development of the CHP technology. As a case study a CHP plant that could be built-up in Republic of Macedonia is analyzed. The main economic parameters for project evaluation, such as NPV and IRR are calculated for a number of possible scenarios. The analyze present the economic outputs that could be used as a decision for CHP project acceptance for investment. (Author)

  2. Distributed control system for CANDU 9 nuclear power plant

    International Nuclear Information System (INIS)

    Harber, J.E.; Kattan, M.K.; Macbeth, M.J.

    1996-01-01

    Canadian designed CANDU pressurized heavy water nuclear reactors have been world leaders in electrical power generation. The CANDU 9 project is AECL's next reactor design. The CANDU 9 plant monitoring, annunciation, and control functions are implemented in two evolutionary systems; the distributed control system (DCS) and the plant display system (PDS). The CDS implements most of the plant control functions in a single hardware platform. The DCS communicates with the PDS to provide the main operator interface and annunciation capabilities of the previous control computer designs along with human interface enhancements required in a modern control system. (author)

  3. Economic-financial analysis of 'Angra 3 Nuclear Power Plant' project

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2005-01-01

    This paper presents an economic-financial evaluation of 'Angra 3 Nuclear Power Plant' project and estimates the lowest power tariff value at which power potentially made available may be commercialized and yet ensure the project a profitability level agreeable to the interests of economic agents and shareholders. According to the 'project evaluation' practice, Angra 3 power generation was considered separately from ELETRONUCLEAR's operating plants (Angra 1 and Angra 2), thus preventing result distortions bound to occur if the economic-financial variables of the new project were analyzed associated with financial commitments and commercialization conditions resulting from the project implementation process and the generated power commercialization conditions, respectively. For this evaluation different technical and economic scenarios were devised, and the theory of Capital Asset Pricing Model for Own Capital cost and that of Weighted Average Cost of Capital were used in addition to the forecast of the Statement of Results and Free Cash flow of Shareholders throughout the power plant life, which is the estimate basis for the lowest power tariff value and the Internal Return Rate of the project. The evaluation conclusion is that Angra 3 project is technically and economically feasible and competitive as compared to the new large power generation projects planned for power supply in Brazil in the next decade, mainly in the Southeast. (author)

  4. Feasibility study on rehabilitation of ICE San Antonio Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Costa Rica takes a power generation system using hydro power generation as the main source, and possesses medium-capacity gas turbines to supplement needs in the dry season and the peak load. However, a problem has come up that, in addition to the cost rise in gas turbine fuel, the power generation efficiency has been aggravating due to aged deterioration of the generators being used. In association therewith, the problem is now a factor to increase CO2 emission, which is a worldwide problem. Keeping in mind to link it to the clean development mechanism (CDM), the present project is, taking up the SAN ANTONIO power plant as the investigation object, intended to perform a comprehensive discussion on the CO2 emission reducing effect, profitability, and proliferation effect, by executing the conceptual plant design. The up-grading plan for thermal power generation systems in Costa Rica consists of replacement of the gas turbines, handling of phase modifiers, and achievement of the combined cycle. The plan agrees with the present feasibility study intended of CO2 emission reduction, consisting of the modification plan of the SAN ANTONIO power plant, that is the plan to replace the over-aged gas turbines at the power plant. Its necessity has been identified. It was disclosed that the project has the effects of reducing CO2 of 82,000 tons annually, and the investment can be recovered in nine years. (NEDO)

  5. Physical and financial virtual power plants

    International Nuclear Information System (INIS)

    Willems, Bert

    2005-01-01

    Regulators in Belgium and the Netherlands use different mechanisms to mitigate generation market power. In Belgium, antitrust authorities oblige the incumbent to sell financial Virtual Power Plants, while in the Netherlands regulators have been discussing the use of physical Virtual Power Plants. This paper uses a numerical game theoretic model to simulate the behavior of the generation firms and to compare the effects of both systems on the market power of the generators. It shows that financial Virtual Power Plants are better for society. (Author)

  6. Technical Feasibility Study of Thermal Energy Storage Integration into the Conventional Power Plant Cycle

    Directory of Open Access Journals (Sweden)

    Jacek D. Wojcik

    2017-02-01

    Full Text Available The current load balance in the grid is managed mainly through peaking fossil-fuelled power plants that respond passively to the load changes. Intermittency, which comes from renewable energy sources, imposes additional requirements for even more flexible and faster responses from conventional power plants. A major challenge is to keep conventional generation running closest to the design condition with higher load factors and to avoid switching off periods if possible. Thermal energy storage (TES integration into the power plant process cycle is considered as a possible solution for this issue. In this article, a technical feasibility study of TES integration into a 375-MW subcritical oil-fired conventional power plant is presented. Retrofitting is considered in order to avoid major changes in the power plant process cycle. The concept is tested based on the complete power plant model implemented in the ProTRAX software environment. Steam and water parameters are assessed for different TES integration scenarios as a function of the plant load level. The best candidate points for heat extraction in the TES charging and discharging processes are evaluated. The results demonstrate that the integration of TES with power plant cycle is feasible and provide a provisional guidance for the design of the TES system that will result in the minimal influence on the power plant cycle.

  7. Seismic Vulnerability Assessment of Site-Vicinity Infrastructure for Supporting the Accident Management of a Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    T. J. Katona

    2017-01-01

    Full Text Available Nuclear power plants shall be designed to resist the effects of large earthquakes. The design basis earthquake affects large area around the plant site and can cause serious consequences that will affect the logistical support of the emergency actions at the plant, influence the psychological condition of the plant personnel, and determine the workload of the country’s disaster management personnel. In this paper the main qualitative findings of a study are presented that have been performed for the case of a hypothetical 10−4/a probability design basis earthquake for the Paks Nuclear Power Plant, Hungary. The study covers the qualitative assessment of the postearthquake conditions at the settlements around the plant site including quantitative evaluation of the condition of dwellings. The main goal of the recent phase of the study was to identify public utility vulnerabilities that define the outside support conditions of the nuclear power plant accident management. The results of the study can be used for the planning of logistical support of the plant accident management staff. The study also contributes to better understanding of the working conditions of the disaster management services in the region around the nuclear power plant.

  8. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  9. Utility survey on nuclear power plant siting and nuclear energy centers

    International Nuclear Information System (INIS)

    Cope, D.F.; Bauman, H.F.

    1977-01-01

    Most of the large U.S. utilities were surveyed by telephone and mail on questions concerning nuclear power plant siting and nuclear energy centers (NECs). The main purpose of the survey was for guidance of ERDA's NEC program. The questions covered the following topics: availability of sites; impact of environmental and other restraints; plans for development of multi-unit sites; interest in NEC development; interest in including fuel-cycle facilities in NECs; and opinions on the roles desired for the state and Federal governments in power plant siting. The main conclusion of the survey was that, while many utilities were considering multiple-unit sites of 2 to 5 units, none were planning larger energy centers at the present time. However, several expressed interest in NECs as a long-range future development

  10. Surveillance and fault diagnosis for power plants in the Netherlands: operational experience

    International Nuclear Information System (INIS)

    Turkcan, E.; Ciftcioglu, O.; Hagen, T.H.J.J. van der

    1998-01-01

    Nuclear Power Plant (NPP) surveillance and fault diagnosis systems in Dutch Borssele (PWR) and Dodewaard (BWR) power plants are summarized. Deterministic and stochastic models and artificial intelligence (AI) methodologies effectively process the information from the sensors. The processing is carried out by means of methods and algorithms that are collectively referred to Power Reactor Noise Fault Diagnosis. Two main schemes used are failure detection and instrument fault detection. In addition to conventional and advanced modern fault diagnosis methodologies involved, also the applications of emerging technologies in Dutch reactors are given and examples from operational experience are presented. (author)

  11. Operating experience from Swedish nuclear power plants, 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The total generation of electricity from Swedish nuclear power plants was 70.1 TWh during 1999, which is slightly more than the mean value for the last five years. The total electricity consumption decreased by one percent, compared with 1998, to a total of 142.3 TWh, due to an unusually warm summer and autumn. The abundant supply of hydroelectric power resulted in comparatively extensive load-following operation by the nuclear plants during the year. Production losses due to low demand totalled 3.0 TWh. The closure of Barsebaeck 1 will result in a capacity reduction exceeding 4 TWh per year. The hydroelectric power production was 70 TWh, which was 6 TWh more than during a normal year, i.e. a year with average rainfall. The remaining production sources, mainly from solid fuel plants combined with district heating contributed 9 TWh. Electricity generation by means of wind power is still increasing. There are now about 470 wind power stations, which produced 0.3 TWh during the year. The total electricity generation totalled 149.8 TWh, a three percent decrease compared with 1998. The preliminary figures for export were 15.9 TWh and for import 8.4 TWh. The figures above are calculated from the preliminary production result. A comprehensive report on electric power supply and consumption in Sweden is provided in the 1999 Annual Report from the Swedish Power Association. The unit capability factor for the PWRs at Ringhals averaged 91%, while the BWRs averaged 82% mainly due to the extended outages. The BWR reactors at Forsmark averaged as much as 93%. Forsmark 1 experienced the shortest refuelling outage ever in Sweden, only 9 days and 20 hours. In May, Oskarshamn 2 passed a historical milestone - the unit produced 100 TWh since connection to the grid in 1974. The final production day for Barsebaeck 1, which had been in commercial operation since 1975, was on November 30 when a decision by the Swedish Government revoked the operating licence. Three safety-related events

  12. Conceptual design of nuclear power plants database system

    International Nuclear Information System (INIS)

    Ishikawa, Masaaki; Izumi, Fumio; Sudoh, Takashi.

    1984-03-01

    This report is the result of the joint study on the developments of the nuclear power plants database system. The present conceptual design of the database system, which includes Japanese character processing and image processing, has been made on the data of safety design parameters mainly found in the application documents for reactor construction permit made available to the public. (author)

  13. Reviewing computer capabilities in nuclear power plants

    International Nuclear Information System (INIS)

    1990-06-01

    The OSART programme of the IAEA has become an effective vehicle for promoting international co-operation for the enhancement of plant operational safety. In order to maintain consistency in the OSART reviews, OSART Guidelines have been developed which are intended to ensure that the reviewing process is comprehensive. Computer technology is an area in which rapid development is taking place and new applications may be computerized to further enhance safety and the effectiveness of the plant. Supplementary guidance and reference material is needed to help attain comprehensiveness and consistency in OSART reviews. This document is devoted to the utilization of on-site and off-site computers in such a way that the safe operation of the plant is supported. In addition to the main text, there are several annexes illustrating adequate practices as found at various operating nuclear power plants. Refs, figs and tabs

  14. Considerations on safety against seismic excitations in the project of reactor auxiliary building and control building in nuclear power plants

    International Nuclear Information System (INIS)

    Santos, S.H.C.; Castro Monteiro, I. de

    1986-01-01

    The seismic requests to be considered in the project of main buildings of a nuclear power plant are discussed. The models for global seismic analysis of nuclear power plant structures, as well as models for global strength distribution are presented. The models for analysing reactor auxiliary building and control building, which together with the reactor building and turbine building form the main energy generation complex in a nuclear power plant, are described. (M.C.K.) [pt

  15. Leak detection evaluation of boiler tube for power plant using acoustic emission

    International Nuclear Information System (INIS)

    Lee, Sang Guk; Chung, Min Hwa; Nam, Ki Woo

    2001-01-01

    Main equipment of thermal power plant, such as boiler and turbine, are designed and manufactured by domestic techniques. And also the automatic control facilities controlling the main equipment are at the applying step of the localization. and many parts of BOP(Balance Of Plant) equipment are utilizing, localized. But because the special equipment monitoring the operation status of the main facilities such as boiler and turbine are still dependent upon foreign technology and especially boiler tube leak detection system is under the initial step of first application to newly-constructed plants and the manufacturing and application are done by foreign techniques mostly, fast localization development is required. Therefore, so as to study and develop boiler tube leak detection system, we performed studying on manufacturing, installation in site, acoustic emission(AE) signal analysis and discrimination etc. As a result of studying on boiler tube leak detection using AE, we conformed that diagnosis for boiler tube and computerized their trend management is possible, and also it is expected to contribute to safe operation of power generation facilities.

  16. Concrete containment vessels (CCV) for nuclear power plants, (1)

    International Nuclear Information System (INIS)

    Ibe, Yukimi; Kitajima, Masatake

    1977-01-01

    Containment vessels (CV) and the construction of concrete containment vessels (CCV) for nuclear power plants are described generally, and their use and techniques in foreign countries are illustrated, in connection with the introduction of CCV to Japanese nuclear power plants. The introduction deals with the construction plan of Japanese nuclear power plants, and with the difficulties in the steel CV for large scale construction. The investigations, tests and researches are not yet sufficient. The prompt establishment of safety supported by technical criteria, analytical methods and experiments is desired. The second part deals with the consideration for aseismatic design, construction, function and characteristics of CCV. The classification and currently employed CCV, which is mainly reinforced concrete containment vessels (RCCV), are described, and the typical CCV employed for BWR is illustrated. Further, the typical arrangement of reinforcing steels at the cylindrical portion and the dome portion of RCCV is illustrated. The third part deals with the present state of CCV abroad. A prestressed concrete containment vessel (PCCV) of Turkey Point power plant is illustrated as a typical example of CCV. The tests reported in the international meeting for the design, construction and operation of concrete pressure vessels and concrete containment vessels at York University in England in 1975 are reviewed. Typical examples of the design conditions, the size and form, and the construction procedure for PCCV and RCCV abroad are reviewed. (Iwakiri, K.)

  17. Problems and prospects of nuclear power plants construction

    Directory of Open Access Journals (Sweden)

    Pergamenshhik Boris Klimentyevich

    2014-02-01

    Full Text Available 60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training.

  18. Training of power plant operating personnel

    International Nuclear Information System (INIS)

    Kraftwerksschule, E.V.

    1986-01-01

    In Germany, professional training of power plant operating personnel became an important issue in the fifties, when power plant parameters as well as complexity of instrumentation and control increased considerably. Working Groups of VGB Technische Vereiningung der Grosskraftwerketreiber e.v. (Association of Large Power Plant Operators) developed a professional career for power plant operating personnel and defined pre-requisites, scope and objectives of training. In 1957 the German utilities founded KRAFTWERKSSCHULE E.V. (kws) as a school for theoretical training and for guidance of practical training in the power plants. KWS is a non-profit organisation and independent of authorities. Today KWS has 127 members in Germany and in 6 other countries. The objectives of KWS include the training of: -Kraftwerker (control room operators; - Kraftwerksmesiter (shift supervisors); and - shift engineers; according the guidelines of the VGB

  19. Human factors in nuclear power plants

    International Nuclear Information System (INIS)

    Pack, R.W.

    1978-01-01

    The Electric Power Research Institute has started research in human factors in nuclear power plants. One project, completed in March 1977, reviewed human factors problems in operating power plants and produced a report evaluating those problems. A second project developed computer programs for evaluating operator performance on training simulators. A third project is developing and evaluating control-room design approaches. A fourth project is reviewing human factors problems associated with power-plant maintainability and instrumentation and control technician activities. Human factors engineering is an interdisciplinary specialty concerned with influencing the design of equipment systems, facilities, and operational environments to promote safe, efficient, and reliable operator performance. The Electric Power Research Institute (EPRI) has undertaken four projects studying the application of human factors engineering principles to nuclear power plants. (author)

  20. Probabilistic Analysis of Electrical Energy Costs: Comparing Production Costs for Gas, Coal and Nuclear Power Plants. Annex III

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-12-15

    The increase in electricity demand is linked to the development of the economy and living standards in each country. This is especially true in those developing countries in which electricity consumption is far below the average of industrialized countries. To satisfy the increased demand for electricity, it is necessary to build new electrical power plants that could, in an optimum way, meet the imposed acceptability criteria. The main criteria are the potential to supply the required energy and to supply it with minimum or, at least, acceptable costs and environmental impacts, to satisfy the licensing requirements and be acceptable to the public. The main competitors for electricity production in the next few decades are fossil fuel power plants (coal and gas) and nuclear power plants. Power plants making use of renewables (solar, wind, biomass) are also important, but due to limited energy supply potential and high costs, can only be a supplement to the main generating units. Large hydropower plants would be competitive under the condition that suitable sites for the construction of such plants exist. Unfortunately, both in Croatia and in the rest of central Europe, such sites are scarce.

  1. Tomography of the 2011 Iwaki earthquake (M 7.0) and Fukushima nuclear power plant area

    Energy Technology Data Exchange (ETDEWEB)

    Tong, P. [Tohoku Univ., Sendai (Japan). Dept. of Geophysics; Tsinghua Univ., Beijing (China). Dept. of Mathematical Sciences; Zhao, D. [Tohoku Univ., Sendai (Japan). Dept. of Geophysics; Yang, D. [Tsinghua Univ., Beijing (China). Dept. of Mathematical Sciences

    2012-07-01

    High-resolution tomographic images of the crust and upper mantle in and around the area of the 2011 Iwaki earthquake (M 7.0) and the Fukushima nuclear power plant are determined by inverting a large number of high-quality arrival times with both the finite-frequency and ray tomography methods. The Iwaki earthquake and its aftershocks mainly occurred in a boundary zone with strong variations in seismic velocity and Poisson's ratio. Prominent low-velocity and high Poisson's ratio zones are revealed under the Iwaki source area and the Fukushima nuclear power plant, which may reflect fluids released from the dehydration of the subducting Pacific slab under Northeast Japan. The 2011 Tohoku-oki earthquake (Mw 9.0) caused static stress transfer in the overriding Okhotsk plate, resulting in the seismicity in the Iwaki source area that significantly increased immediately following the Tohoku-oki main-shock. Our results suggest that the Iwaki earthquake was triggered by the ascending fluids from the Pacific slab dehydration and the stress variation induced by the Tohoku-oki main-shock. The similar structures under the Iwaki source area and the Fukushima nuclear power plant suggest that the security of the nuclear power plant site should be strengthened to withstand potential large earthquakes in the future. (orig.)

  2. TOSHIBA CAE system for nuclear power plant

    International Nuclear Information System (INIS)

    Machiba, Hiroshi; Sasaki, Norio

    1990-01-01

    TOSHIBA aims to secure safety, increase reliability and improve efficiency through the engineering for nuclear power plant using Computer Aided Engineering (CAE). TOSHIBA CAE system for nuclear power plant consists of numbers of sub-systems which had been integrated centering around the Nuclear Power Plant Engineering Data Base (PDBMS) and covers all stage of engineering for nuclear power plant from project management, design, manufacturing, construction to operating plant service and preventive maintenance as it were 'Plant Life-Cycle CAE System'. In recent years, TOSHIBA has been devoting to extend the system for integrated intelligent CAE system with state-of-the-art computer technologies such as computer graphics and artificial intelligence. This paper shows the outline of CAE system for nuclear power plant in TOSHIBA. (author)

  3. New nuclear power plant unit in Finland accepted by the Finnish Parliament

    International Nuclear Information System (INIS)

    Kaetkae, M.

    2002-01-01

    The nuclear option has been included in Finland's energy strategy since late 1990's. Based on TVO's application the Finnish Parliament accepted in May 2002 the decision in principle to build a new nuclear power plant unit. The main arguments were the growth of electricity demand, reduction of CO 2 emissions, security of energy supply and reasonable as well as predictable electricity price. TVO's intention is to get the new power plant unit into commercial operation at the end of this decade.(author)

  4. Radioecological monitoring of the environment of a French nuclear power plant after 12 years in operation

    International Nuclear Information System (INIS)

    Foulquier, L.; Descamps, B.; Roussel, S.

    1992-01-01

    Taking Fessenheim Nuclear Power Plant as an example, this paper gives a description of various types of environmental test carried out under the responsibility of the Operator of Nuclear Power Plants in France: permanent monitoring of radioactivity, periodic radioecological assessments. The main results of measurements taken, show the effect of the Plant to be negligible. 8 refs., 1 fig., 4 tabs

  5. Effect of nuclear power on CO₂ emission from power plant sector in Iran.

    Science.gov (United States)

    Kargari, Nargess; Mastouri, Reza

    2011-01-01

    It is predicted that demand for electricity in Islamic Republic of Iran will continue to increase dramatically in the future due to the rapid pace of economic development leading to construction of new power plants. At the present time, most of electricity is generated by burning fossil fuels which result in emission of great deal of pollutants and greenhouse gases (GHG) such as SO₂, NOx, and CO₂. The power industry is the largest contributor to these emissions. Due to minimal emission of GHG by renewable and nuclear power plants, they are most suitable replacements for the fossil-fueled power plants. However, the nuclear power plants are more suitable than renewable power plants in providing baseload electricity. The Bushehr Nuclear Power Plant, the only nuclear power plant of Iran, is expected to start operation in 2010. This paper attempts to interpret the role of Bushehr nuclear power plant (BNPP) in CO₂ emission trend of power plant sector in Iran. In order to calculate CO₂ emissions from power plants, National CO₂ coefficients have been used. The National CO₂ emission coefficients are according to different fuels (natural gas, fuels gas, fuel oil). By operating Bushehr Nuclear Power Plant in 2010, nominal capacity of electricity generation in Iran will increase by about 1,000 MW, which increases the electricity generation by almost 7,000 MWh/year (it is calculated according to availability factor and nominal capacity of BNPP). Bushehr Nuclear Power Plant will decrease the CO₂ emission in Iran power sector, by about 3% in 2010.

  6. Analysis and comparison between a concentrating solar and a photovoltaic power plant

    International Nuclear Information System (INIS)

    Desideri, Umberto; Campana, Pietro Elia

    2014-01-01

    Highlights: • The performance of CSP and PV plants were compared with similar assumptions. • The influence of the site on the performance of CSP and PV plants is determined. • CSP plants performance is always higher in locations where DNI is prevailing. • CSP levelized electricity costs are generally lower than those from PV plants. • PV plants may produce larger amounts of electricity where the DNI is not prevailing. - Abstract: Solar energy is a source, which can be exploited in two main ways to generate power: direct conversion into electric energy using photovoltaic panels and by means of a thermodynamic cycle. In both cases the amount of energy, which can be converted, is changing daily and seasonally, causing a discontinuous electricity production. In order to limit this drawback, concentrated solar power plants (CSP) and photovoltaic plants (PV) can be equipped with a storage system that can be configured not only for covering peak-loads but also for the base-load after the sunset or before the sunrise. In CSP plants it is the sun’s thermal energy to be stored, whereas in PV applications it is the electrical energy to be stored in batteries, although this is not economically and environmentally feasible in large-scale power plants. The main aim of this paper is to study the performance of concentrated solar power plants equipped with molten salts thermal storage to cover a base load of 3 MW el . In order to verify the possibility of storing effectively the thermal energy and to design a plant for base load operation, two locations were chosen for the study: Gela in southern Italy, and Luxor in Egypt. The electricity production of the CSP facilities has been analyzed and then compared with the electricity production of PV plants. Two different comparisons were done, one by sizing the PV plant to provide the same peak power and one using the same collectors surface. This paper has also highlighted some important issues in site selection and in

  7. Overview of electric power industry of main countries in the world

    International Nuclear Information System (INIS)

    2013-01-01

    The electric power supply system, power producer, regulation system, electricity liberalization, power demand and supply, electricity rate, development of electric power sources, nuclear power generation and renewable energy of six countries such as USA, England, German, France, Russia and China are reported. On USA, 3,754 x 10 9 kWh of total electric energy, 104 of nuclear reactors are running and giving careful consideration to safety of the plant. Shale gas production is increasing, and new technology of electric car, smart grid and demand response is developing. On England, 368 x 10 9 kWh of total electric energy, which consisted of 70.4% thermal power, 18.8% nuclear power and 10.8% renewable energy, 18 nuclear reactors are running, but almost nuclear power plants will be closed until 2023. Biomass and wind power have been developed. On German, 609 x 10 9 kWh of total electric energy, 9 nuclear reactors are running but closed till 2022, the renewable energy such as wind power and photovoltaic is introduced. On France, 542 x 10 9 kWh total electric energy, which consisted of 9% hydroelectricity, 9% thermal power, 78% nuclear power and 4% renewable energy. The renewable energy plan is formulated. On Russia, 1,052 x 10 9 kWh total electric energy consisted of 67.8% thermal power, 15.7% hydroelectricity and 16.4% nuclear power, 32 nuclear power plants are running and 9 nuclear reactors building. On China, 4,693 x 10 9 kWh power consumption, 6 nuclear power plants are running to generate 1.85% electric energy, the objects of nuclear power generation and renewable energy were announced. (S.Y.)

  8. TAPCHAN Wave Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    1983-10-01

    The Tapered Channel Wave Power Plant (TAPCHAN) is based on a new method for wave energy conversion. The principle of operation can be explained by dividing the system into the following four sub-systems: Firstly, a collector which is designed to concentrate the water energy and optimize collection efficiency for a range of frequencies and directions. Secondly, the energy converter, in which the energy of the collected waves is transformed into potential energy in an on-shore water reservoir. This is the unique part of the power plant. It consists of a gradually narrowing channel with wall heights equal to the filling level of the reservoir (typical heights 3-7 m). The waves enter the wide end of the channel and as they propagate down the narrowing channel, the wave height is amplified until the wavecrests spill over the walls. Thirdly, a reservoir which provides a stable water supply for the turbines. Finally, the hydroelectric power plant, where well established techniques are used for the generation of electric power. The water turbine driving the electric generator is of a low head type, such as a Kaplan or a tubular turbine. It must be designed for salt water operation and should have good regulation capabilities. Power plants based on the principle described, are now offered on a commercial basis.

  9. On results of measurement and method of behavior analysis for land slide protection wall in excavation works for main building foundation of No.2 plant in Kashiwazaki-Kariwa Nuclear Power Station, Tokyo Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Otsuki, Hideo; Tsuchi, Hiroyuki; Nishioka, Toshimichi

    1987-01-01

    Tokyo Electric Power Co. has been constructing the nuclear power station having 8 million kW capacity of seven BWR plants in the site of about 4.2 million m 2 in Niigata Prefecture. No.1 BWR plant of 1100 MWe output started the operation in September, 1985. As a rule, the important structures in nuclear power stations such as a reactor building and a turbine building are to be directly supported on bedrocks, and in this case, on the mudstone of Nishiyama strata. As this Nishiyama strata exists in large depth, the excavation works for the foundations of buildings are to be carried out by installing large scale land slide protection walls. In this report, among the excavation works for the main building foundation of No.2 plant, the results of examining the behavior of the land slide protection wall installed in soft rock ground based on the results of measurement of vertical excavation by land slide protection method and the techniques of its analysis are described. The geological features, the design of land slide protection walls, the measurement of the land slide protection walls and surrounding ground and the results, and the examination of the analysis methods by a beam model and FEM are reported. (Kako, I.)

  10. Modernization and power increase nuclear power plant Laguna Verde (Mexico); Modernizacion y aumento de potencia de la central nuclear Laguna Verde (Mexico)

    Energy Technology Data Exchange (ETDEWEB)

    Garcia-Serrano, J. L.; Merino, A.; Ruiz Gutierrez, L.

    2011-07-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Uprate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4 years (82007-2010), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. (Author)

  11. Statistical modeling of an integrated boiler for coal fired thermal power plant

    Directory of Open Access Journals (Sweden)

    Sreepradha Chandrasekharan

    2017-06-01

    Full Text Available The coal fired thermal power plants plays major role in the power production in the world as they are available in abundance. Many of the existing power plants are based on the subcritical technology which can produce power with the efficiency of around 33%. But the newer plants are built on either supercritical or ultra-supercritical technology whose efficiency can be up to 50%. Main objective of the work is to enhance the efficiency of the existing subcritical power plants to compensate for the increasing demand. For achieving the objective, the statistical modeling of the boiler units such as economizer, drum and the superheater are initially carried out. The effectiveness of the developed models is tested using analysis methods like R2 analysis and ANOVA (Analysis of Variance. The dependability of the process variable (temperature on different manipulated variables is analyzed in the paper. Validations of the model are provided with their error analysis. Response surface methodology (RSM supported by DOE (design of experiments are implemented to optimize the operating parameters. Individual models along with the integrated model are used to study and design the predictive control of the coal-fired thermal power plant. Keywords: Chemical engineering, Applied mathematics

  12. Mechanization devices for maintenance of technological components of nuclear power plant primary circuit

    International Nuclear Information System (INIS)

    Palicka, L.; Blazek, J.

    1987-01-01

    Selected mechanization devices are described, developed for assembly and repair jobs and for decontamination of the steam generator, the main closing valve and the main circulating pump of a WWER-440 nuclear power plant. (author). 8 figs., 3 tabs., 10 refs

  13. Plant life management and maintenance technologies for nuclear power plants

    International Nuclear Information System (INIS)

    Ikegami, Tsukasa; Aoki, Masataka; Shimura, Takao; Kaimori, Kimihiro; Koike, Masahiro

    2001-01-01

    Nuclear power generation occupying an important position for energy source in Japan and supplying about one third of total electric power usage is now required for further upgrading of its economics under regulation relaxation of electric power business. And, under execution retardation of its new planning plant, it becomes important to operate the already established plants for longer term and to secure their stability. Therefore, technical development in response to the plant life elongation is promoted under cooperation of the Ministry of Economics and Industries, electric power companies, literate, and plant manufacturers. Under such conditions, the Hitachi, Ltd. has progressed some technical developments on check inspection, repairs and maintenance for succession of the already established nuclear power plants for longer term under securing of their safety and reliability. And in future, by proposing the check inspection and maintenance program combined with these technologies, it is planned to exert promotion of maintenance program with minimum total cost from a viewpoint of its plant life. Here were described on technologies exerted in the Hitachi, Ltd. such as construction of plant maintenance program in response to plant life elongation agreeing with actual condition of each plant, yearly change mechanism grasping, life evaluation on instruments and materials necessary for maintenance, adequate check inspection, repairs and exchange, and so forth. (G.K.)

  14. Power conversion and balance of plant considerations for the STARFIRE commercial tokamak reactor

    International Nuclear Information System (INIS)

    Barry, K.; Graumann, D.

    1981-01-01

    The power conversion and balance of plant facilities for this tenth-of-a-kind tokamak fusion power plant are a combination of both features common to any large power plant, and elements peculiar to the fusion technology. For example, the steam generators, turbine-generator and main condenser components of the power conversion system and the natural draft cooling towers that are used for heat rejection at sites not close to a large body of water are generic to power plants. The tritium reprocessing facilities that minimize the tritium inventory in the plant, the Electrical and RF Power Supply Building that contains the coil and rf power supplies, the cryogenic facilities that provide liquid helium coolant for the superconducting coils, and the Hot Cell in which fully remote repair and maintenance functions are performed are unique to a fusion power plant. One of the major features of the STARFIRE design is steady state operation that maximizes overall facility reliability and eliminates both thermal storage requirements and potential power fluctuations on the grid. The reference reactor power is 4000 MWt with a gross electric power generation of 1440 MW. For STARFIRE, water is the preferred coolant and is utilized in both the first wall/blanket and limiter cooling circuits. Dual parallel primary coolant loops cool the twenty-four first-wall/blanket sectors. The power deposited in the limiter, approximately 5% of the total thermal power, is removed by the separate limiter/feedwater loop and is used for feedwater heating in the steam power conversion system

  15. Research on the Application of Risk-based Inspection for the Boiler System in Power Plant

    Science.gov (United States)

    Li, Henan

    2017-12-01

    Power plant boiler is one of the three main equipment of coal-fired power plants, is very tall to the requirement of the safe and stable operation, in a significant role in the whole system of thermal power generation, a risk-based inspection is a kind of pursuit of security and economy of unified system management idea and method, can effectively evaluate equipment risk and reduce the operational cost.

  16. Evaluating and improving nuclear power plant operating performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This report aims to provide the basis for improvements in the understanding of nuclear power plants operation and ideas for improving future productivity. The purpose of the project was to identify good practices of operating performance at a few of the world`s most productive plants. This report was prepared through a series of consultants meetings, a specialists meeting and an Advisory Group meeting with participation of experts from 23 Member States. The report is based on self-assessment of half a dozen plants that have been chosen as representatives of different reactor types in as many different countries, and the views and assessment of the participants on good practices influencing plant performance. Three main areas that influence nuclear power plant availability and reliability were identified in the discussions: (1) management practices, (2) personnel characteristics, and (3) working practices. These areas cover causes influencing plant performance under plant management control. In each area the report describes factors or good practices that positively influence plant availability. The case studies, presented in annexes, contain the plant self-assessment of areas that influence their availability and reliability. Six plants are represented in the case studies: (1) Dukovany (WWER, 1760 MW) in the Czech Republic; (2) Blayais (PWR, 3640 MW) in France; (3) Paks (WWER, 1840 MW) in Hungary; (4) Wolsong 1 (PHWR, 600 MW) in the Republic of Korea; (5) Trillo 1 (PWR, 1066 MW) in Spain; and (6) Limerick (BWR, 2220 MW) in the United States of America Figs, tabs

  17. Wind power plant

    Energy Technology Data Exchange (ETDEWEB)

    Kling, A

    1977-01-13

    The wind power plant described has at least one rotor which is coupled to an electricity generator. The systems are fixed to a suspended body so that it is possible to set up the wind power plant at greater height where one can expect stronger and more uniform winds. The anchoring on the ground or on a floating body is done by mooring cables which can simultaneously have the function of an electric cable. The whole system can be steered by fins. The rotor system itself consists of at least one pair of contrarotating, momentum balanced rotors.

  18. An intelligent man-machine system for future nuclear power plants

    International Nuclear Information System (INIS)

    Takizawa, Yoji; Hattori, Yoshiaki; Itoh, Juichiro; Fukumoto, Akira

    1994-01-01

    The objective of the development of an intelligent man-machine system for future nuclear power plants is enhancement of operational reliability by applying recent advances in cognitive science, artificial intelligence, and computer technologies. To realize this objective, the intelligent man-machine system, aiming to support a knowledge-based decision making process in an operator's supervisory plant control tasks, consists of three main functions, i.e., a cognitive model-based advisor, a robust automatic sequence controller, and an ecological interface. These three functions have been integrated into a console-type nuclear power plant monitoring and control system as a validation test bed. The validation tests in which experienced operator crews participated were carried out in 1991 and 1992. The test results show the usefulness of the support functions and the validity of the system design approach

  19. Reliability of emergency ac power systems at nuclear power plants

    International Nuclear Information System (INIS)

    Battle, R.E.; Campbell, D.J.

    1983-07-01

    Reliability of emergency onsite ac power systems at nuclear power plants has been questioned within the Nuclear Regulatory Commission (NRC) because of the number of diesel generator failures reported by nuclear plant licensees and the reactor core damage that could result from diesel failure during an emergency. This report contains the results of a reliability analysis of the onsite ac power system, and it uses the results of a separate analysis of offsite power systems to calculate the expected frequency of station blackout. Included is a design and operating experience review. Eighteen plants representative of typical onsite ac power systems and ten generic designs were selected to be modeled by fault trees. Operating experience data were collected from the NRC files and from nuclear plant licensee responses to a questionnaire sent out for this project

  20. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    2003-01-01

    The Japan Atomic Industrial Forum (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Nuclear power plants in the world'. In this report, some data at the end of 2002 was made up on bases of answers on questionnaires from 65 electric power companies and other nuclear organizations in 28 countries and regions around the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; status of MOX use in the world; location of the plants; the plants in the world; directory of the plants; nuclear fuel cycle facilities; and so forth. (J.P.N.)