  1. Reliability assessment of power pole infrastructure incorporating deterioration and network maintenance

    International Nuclear Information System (INIS)

    Ryan, Paraic C.; Stewart, Mark G.; Spencer, Nathan; Li, Yue

    2014-01-01

    There is considerable investment in timber utility poles worldwide, and there is a need to examine the structural reliability and probability based management optimisation of these power distribution infrastructure elements. The work presented in this paper builds on the existing studies in this area through assessment of both treated and untreated timber power poles, with the effects of deterioration and network maintenance incorporated in the analysis. This more realistic assessment approach, with deterioration and maintenance considered, was achieved using event-based Monte Carlo simulation. The output from the probabilistic model is used to illustrate the importance of considering network maintenance in the time-dependent structural reliability assessment of timber power poles. Under wind load, treated and untreated poles designed and maintained in accordance with existing Australian standards were found to have similar failure rates. However, untreated pole networks required approximately twice as many maintenance based pole replacements to sustain the same level of reliability. The effect of four different network maintenance strategies on infrastructure performance was also investigated herein. This assessment highlighted the fact that slight alterations to network maintenance practices can lead to significant changes in performance of timber power pole networks. - Highlights: • A time-dependent structural reliability model was developed for timber power poles. • Deterioration and network maintenance were incorporated into this event based model. • Network maintenance had a significant impact on power pole wind vulnerability. • Treated and untreated poles designed to Australian standards had similar reliability. • Minor alterations to maintenance strategies had large effects on network performance

  2. Electric Power Infrastructure Reliability And Security Research And Development Initiative. Final report

    International Nuclear Information System (INIS)

    Dale, S.; Meeker, R.; Steurer, M.; Li, H.; Pamidi, S.; Rodrigo, H.; Suryanarayanan, S.; Cartes, D.; Ordonez, J.; Domijan, A.; Liu, W.; Cox, D.; McLaren, P.; Hovsapian, R.; Edwards, D.; Simmons, S.; Wilde, N.; Woodruff, S.; Kopriva, D.; Hussaini, Y.; Mohammed, O.; Zheng, J.; Baldwin, T.L.

    2008-01-01

    This is the final scientific/technical report for the Electric Power Infrastructure Reliability and Security R and D Initiative sponsored by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, under award number DE-FG02-05CH11292. This report covers results from the FSU-led, multi-institution effort conducted over the period 8/15/05 to 10/14/2007. Building upon existing infrastructure for power systems research, modeling, and simulation, the Center for Advanced Power Systems (CAPS) at Florida State University (FSU) is developing world-class programs in electric power systems research and education to support future electric power system needs and challenges. With U.S. Department of Energy Support, FSU CAPS has engaged in a multi-faceted effort to conduct basic and applied research towards understanding, developing, and deploying technologies and approaches that can lead to improved reliability and security of the North American electric power generation and delivery infrastructure. This wide-reaching project, through a number of carefully selected thrusts cutting across several research disciplines, set out to address key terrestrial electric utility power system issues and challenges. The challenges and the thrusts to address them were arrived at through analysis of a number of national reports and recommendations combined with input from an experienced multi-disciplined team of power systems research staff and faculty at FSU CAPS. The resulting project effort can be grouped into four major areas: - Power Systems and New Technology Insertion - Controls, Protection, and Security - Simulation Development - High Temperature Superconductivity (HTS)

  3. Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Rick Meeker; L. Baldwin; Steinar Dale; Alexander Domijan; Davild Larbalestier; Hui Li; Peter McLaren; Sastry Pamidi; Horatio Rodrigo; Michael Steurer

    2010-03-31

    Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and

  4. Market system infrastructure: a major issue for the power system reliability

    International Nuclear Information System (INIS)

    Passelergue, J.Ch.

    2005-01-01

    The restructuring and opening of the electricity market made more complex the power system operation. While the system operator does not own anymore the generation assets, a perfect coordination with the market players is critical to guarantee the power system operation reliability. The market platforms, which are the main links between the system operator and the market players, must include communication means guaranteeing an uninterrupted service. The data-processing infrastructure must thus be designed to ensure the market system accessibility, as well as the effective exchange of data. Moreover, the market systems must facilitate the market operation and monitoring. They must allow the definition of a business process that, on the one hand, allows sequencing the users' actions, and that, on the other hand, provides the errors detected during the data-processing. Lastly, the market systems must facilitate the putting in place and follow-up by the market operator of operational procedures covering all the situations the operator can have to face. (author)

  5. Reliability and vulnerability analyses of critical infrastructures: Comparing two approaches in the context of power systems

    International Nuclear Information System (INIS)

    Johansson, Jonas; Hassel, Henrik; Zio, Enrico

    2013-01-01

    Society depends on services provided by critical infrastructures, and hence it is important that they are reliable and robust. Two main approaches for gaining knowledge required for designing and improving critical infrastructures are reliability analysis and vulnerability analysis. The former analyses the ability of the system to perform its intended function; the latter analyses its inability to withstand strains and the effects of the consequent failures. The two approaches have similarities but also some differences with respect to what type of information they generate about the system. In this view, the main purpose of this paper is to discuss and contrast these approaches. To strengthen the discussion and exemplify its findings, a Monte Carlo-based reliability analysis and a vulnerability analysis are considered in their application to a relatively simple, but representative, system the IEEE RTS96 electric power test system. The exemplification reveals that reliability analysis provides a good picture of the system likely behaviour, but fails to capture a large portion of the high consequence scenarios, which are instead captured in the vulnerability analysis. Although these scenarios might be estimated to have small probabilities of occurrence, they should be identified, considered and treated cautiously, as probabilistic analyses should not be the only input to decision-making for the design and protection of critical infrastructures. The general conclusion that can be drawn from the findings of the example is that vulnerability analysis should be used to complement reliability studies, as well as other forms of probabilistic risk analysis. Measures should be sought for reducing both the vulnerability, i.e. improving the system ability to withstand strains and stresses, and the reliability, i.e. improving the likely behaviour

  6. Modelling Reliability of Supply and Infrastructural Dependency in Energy Distribution Systems

    OpenAIRE

    Helseth, Arild

    2008-01-01

    This thesis presents methods and models for assessing reliability of supply and infrastructural dependency in energy distribution systems with multiple energy carriers. The three energy carriers of electric power, natural gas and district heating are considered. Models and methods for assessing reliability of supply in electric power systems are well documented, frequently applied in the industry and continuously being subject to research and improvement. On the contrary, there are compar...

  7. Securing the United States' power infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Happenny, Sean F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-08-01

    The United States’ power infrastructure is aging, underfunded, and vulnerable to cyber attack. Emerging smart grid technologies may take some of the burden off of existing systems and make the grid as a whole more efficient, reliable, and secure. The Pacific Northwest National Laboratory (PNNL) is funding research into several aspects of smart grid technology and grid security, creating a software simulation tool that will allow researchers to test power distribution networks utilizing different smart grid technologies to determine how the grid and these technologies react under different circumstances. Demonstrating security in embedded systems is another research area PNNL is tackling. Many of the systems controlling the U.S. critical infrastructure, such as the power grid, lack integrated security and the networks protecting them are becoming easier to breach. Providing a virtual power substation network to each student team at the National Collegiate Cyber Defense Competition, thereby supporting the education of future cyber security professionals, is another way PNNL is helping to strengthen the security of the nation’s power infrastructure.

  8. 78 FR 27113 - Version 5 Critical Infrastructure Protection Reliability Standards

    Science.gov (United States)

    2013-05-09

    ... approve certain reliability standards proposed by the North American Electric Reliability Corporation... Infrastructure Protection Reliability Standards, 143 FERC ] 61,055 (2013). This errata notice serves to correct P... Commission 18 CFR Part 40 [Docket No. RM13-5-000] Version 5 Critical Infrastructure Protection Reliability...

  9. 78 FR 76986 - Version 5 Critical Infrastructure Protection Reliability Standards

    Science.gov (United States)

    2013-12-20

    ...; Order No. 791] Version 5 Critical Infrastructure Protection Reliability Standards AGENCY: Federal Energy... 72755). The regulations approved certain reliability standards proposed by the North American Electric... Infrastructure Protection Reliability Standards, 145 FERC ] 61,160 (2013). This errata notice serves to correct P...

  10. Connectivity reliability and topological controllability of infrastructure networks: A comparative assessment

    International Nuclear Information System (INIS)

    Li, Jian; Dueñas-Osorio, Leonardo; Chen, Changkun; Shi, Congling

    2016-01-01

    As infrastructure systems evolve, their design, maintenance, and optimal performance require mature tools from system reliability theory, as well as principles to handle emerging system features, such as controllability. This paper conducts a comparative study of the connectivity reliability (CR) and topological controllability (TC) of infrastructure systems in terms of three aspects: topology, robustness, and node importance. Taking eight city-level power transmission networks and thousands of artificial networks as examples, this paper reveals that a dense and homogeneous network topology is better to satisfy CR and TC requirements, than more common sparse and heterogeneous networks when node attributes are generic. It is observed that the average degree's impact on CR is more significant than on TC, while degree heterogeneity is more significant on TC. When node attributes are accounted for, for generators the reliability-based node importance measure may underestimate some important nodes in terms of TC, and vice versa—an issue not observed for substation nodes. The findings in this paper suggest a potential new direction to enhance reliability-based design by integrating it with emerging controllability-based measures relevant in the future as infrastructure networks increase reliance on information systems. - Highlights: • Compares connectivity reliability (CR) and topological controllability (TC) metrics. • Develops a controllability index and a controllability-based node importance metric. • CR is more sensitive to degree while TC is more sensitive to degree heterogeneity. • CR-based importance measures match TC-based measures for substation nodes. • CR- and TC-based measures are complementary to identify important generator nodes.

  11. Increasing the resilience and security of the United States' power infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Happenny, Sean F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-08-01

    The United States' power infrastructure is aging, underfunded, and vulnerable to cyber attack. Emerging smart grid technologies may take some of the burden off of existing systems and make the grid as a whole more efficient, reliable, and secure. The Pacific Northwest National Laboratory (PNNL) is funding research into several aspects of smart grid technology and grid security, creating a software simulation tool that will allow researchers to test power infrastructure control and distribution paradigms by utilizing different smart grid technologies to determine how the grid and these technologies react under different circumstances. Understanding how these systems behave in real-world conditions will lead to new ways to make our power infrastructure more resilient and secure. Demonstrating security in embedded systems is another research area PNNL is tackling. Many of the systems controlling the U.S. critical infrastructure, such as the power grid, lack integrated security and the aging networks protecting them are becoming easier to attack.

  12. Power infrastructure quality and manufacturing productivity in Africa: A firm level analysis

    International Nuclear Information System (INIS)

    Moyo, Busani

    2013-01-01

    This study sought to examine the impact of the quality of power infrastructure on productivity in African manufacturing firms using data from the World Bank enterprise surveys. We measured power infrastructure quality using the number of hours per day without electricity and the percentage of output lost due to outages and found these indicators to be negative and significant determinants of productivity. These variables seem to be significant determinants in Uganda, Tanzania and Zambia as well as in the food and agriculture sector. To improve economic growth and encourage employment creation, governments in Africa have to come up with measures to improve the reliability of electricity infrastructure. - Highlights: • Power infrastructure quality indicators are found to have a negative and significant effect. • The power quality indicators have varied effects both at country and sector level. • Owning a generator minimises the negative impact of outages in Uganda, Tanzania and Mauritius. • Other controls like labour, capital, foreign ownership etc. have a positive and significant effect. • The firm age variable is insignificant suggesting that accumulated knowledge does not matter

  13. Competitive power markets and grid reliability : keeping the promise

    International Nuclear Information System (INIS)

    Goulding, D.

    2005-01-01

    This white paper discussed various links between restructuring, competitive markets and reliability in the consolidation of electricity markets in Ontario. A historical approach was used, and the first section of the paper reviewed how reliability was managed in the pre-market period. The second section discussed the current reliability model and some of the general issues it has raised, as well as lessons learned. Structural reforms were reviewed. It was noted that currently dominant generators hold more market share than is compatible with ideas of workable competition. Issues concerning the mitigation of market power were discussed, with specific reference to the importance of public opinion. The need for mandatory standards and inclusive processes was emphasized, as well as the implementation of effective communication strategies and consumer education. A resource adequacy mechanism was recommended. The role of the Ontario Power Authority (OPA) was reviewed. Issues concerning consumer protection were examined. Future priorities included investment in infrastructure and reliability, as well as a realignment of markets. It was suggested that energy and reserve trading are critical for ensuring reliability in the market paradigm. Markets and inter-regional trading were discussed in terms of promoting reliability. Improvements in infrastructure were recommended, as well as a reduction in trade barriers. It was concluded that an over-arching, industry-wide commitment to investing in reliability is essential for managing the restructuring and reliability relationship in the years ahead. 15 refs

  14. Nuclear power infrastructure and planning

    International Nuclear Information System (INIS)

    2005-01-01

    There are several stages in the process of introducing nuclear power in a country. These include feasibility studies; technology evaluation; request for proposals and proposal evaluation; project and contracts development and financing; supply, construction, and commissioning; and finally operation. The IAEA is developing guidance directed to provide criteria for assessing the minimum infrastructure necessary for: a) a host country to consider when engaging in the implementation of nuclear power, or b) a supplier country to consider when assessing that the recipient country would be in an acceptable condition to begin the implementation of nuclear power. There are Member States that may be denied the benefits of nuclear energy if the infrastructure requirements are too large or onerous for the national economy. However if co-operation could be achieved, the infrastructure burden could be shared and economic benefits gained by several countries acting jointly. The IAEA is developing guidance on the potential for sharing of nuclear power infrastructure among countries adopting or extending nuclear power programme

  15. Nuclear Power Infrastructure Development Program: Korean Education Program

    International Nuclear Information System (INIS)

    Choi, Sung Yeol; Hwang, Il Soon; Kim, Si Hwan

    2009-01-01

    Many countries have decided nuclear power for next energy resources as one of the long-term energy supply options. IAEA projected nuclear power expansion up to 2030 reaching between 447 GWe and 691 GWe compared to 370 GWe and 2660 TWh at the end of 2006. Both low and high projection is accompanied with new nuclear power plant constructions respectively 178 and 357, about 11 units per year, and most new construction is in North America, the Far East, Eastern Europe, the Middle East, and Southeast Asia. During the last forty years, thirty three countries have established commercial nuclear power programs but only some of them have developed comprehensive and large scale peaceful nuclear power infrastructure. Although various cooperation and guidance program of nuclear power infrastructure, developing appropriate environment and infrastructure of nuclear power plant is still challenging problems for developing countries launching nuclear power program. With increasing the demand of safety and safeguard from international society, creating appropriate infrastructure becomes essential requirements in national nuclear power program. In the viewpoint of developing countries, without sufficient explanation and proper guidance, infrastructure could be seen only as another barrier in its nuclear power program. The importance of infrastructure development would be obscured by ostensible business and infrastructure program can result in increasing entering barriers to peaceful nuclear power application field without benefits to developing countries and international community. To avoid this situation by providing enough explanation and realistic case example and cooperate with the countries wanting to establish comprehensive nuclear power infrastructure in the peaceful applications, we are creating the education program of infrastructure development with basic guidelines of the IAEA infrastructure series and Korean experiences from least developed country to advanced country

  16. Potential for sharing nuclear power infrastructure between countries

    International Nuclear Information System (INIS)

    2006-10-01

    The introduction or expansion of a nuclear power programme in a country and its successful execution is largely dependent on the network of national infrastructure, covering a wide range of activities and capabilities. The infrastructure areas include legal framework, safety and environmental regulatory bodies, international agreements, physical facilities, finance, education, training, human resources and public information and acceptance. The wide extent of infrastructure needs require an investment that can be too large or onerous for the national economy. The burden of infrastructure can be reduced significantly if a country forms a sharing partnership with other countries. The sharing can be at regional or at multinational level. It can include physical facilities, common programmes and knowledge, which will reflect in economic benefits. The sharing can also contribute in a significant manner to harmonization of codes and standards in general and regulatory framework in particular. The opportunities and potential of sharing nuclear power infrastructure is determined by the objectives, strategy and scenario of the national nuclear power programme. A review of individual infrastructure items shows that there are several opportunities for sharing of nuclear power infrastructure between countries if they cooperate with each other. International cooperation and sharing of nuclear power infrastructure are not new. This publication provides criteria and guidance for analyzing and identifying the potential for sharing of nuclear power infrastructure during the stages of nuclear power project life cycle. The target users are decision makers, advisers and senior managers in utilities, industrial organizations, regulatory bodies and governmental organizations in countries adopting or extending nuclear power programmes. This publication was produced within the IAEA programme directed to increase the capability of Member States to plan and implement nuclear power

  17. Building Resilient Cloud Over Unreliable Commodity Infrastructure

    OpenAIRE

    Kedia, Piyus; Bansal, Sorav; Deshpande, Deepak; Iyer, Sreekanth

    2012-01-01

    Cloud Computing has emerged as a successful computing paradigm for efficiently utilizing managed compute infrastructure such as high speed rack-mounted servers, connected with high speed networking, and reliable storage. Usually such infrastructure is dedicated, physically secured and has reliable power and networking infrastructure. However, much of our idle compute capacity is present in unmanaged infrastructure like idle desktops, lab machines, physically distant server machines, and lapto...

  18. Planning for a space infrastructure for disposal of nuclear space power systems

    International Nuclear Information System (INIS)

    Angelo, J. Jr.; Albert, T.E.; Lee, J.

    1989-01-01

    The development of safe, reliable, and compact power systems is vital to humanity's exploration, development, and, ultimately, civilization of space. Nuclear power systems appear to present to offer the only practical option of compact high-power systems. From the very beginning of US space nuclear power activities, safety has been a paramount requirement. Assurance of nuclear safety has included prelaunch ground handling operations, launch, and space operations of nuclear power sources, and more recently serious attention has been given to postoperational disposal of spent or errant nuclear reactor systems. The purpose of this paper is to describe the progress of a project to utilize the capabilities of an evolving space infrastructure for planning for disposal of space nuclear systems. Project SIREN (Search, Intercept, Retrieve, Expulsion - Nuclear) is a project that has been initiated to consider post-operational disposal options for nuclear space power systems. The key finding of Project SIREN was that although no system currently exists to affect the disposal of a nuclear space power system, the requisite technologies for such a system either exist or are planned for part of the evolving space infrastructure

  19. Basic infrastructure for a nuclear power project

    International Nuclear Information System (INIS)

    2006-06-01

    There are several stages in the process of introducing nuclear power in a country. These include development of nuclear policies and regulations, feasibility studies, public consultations, technology evaluation, requests for proposals and evaluations, contracts and financing, supply, construction, commissioning, operation and finally decommissioning. This publication addresses the 'basic' infrastructure needs, which are adequate until the issue of the construction license. It is obvious that a fully developed nuclear infrastructure will be required for the further implementation stages of a nuclear power reactor. The officials and experts in each country will undertake the transition from a basic infrastructure to a fully developed infrastructure that covers the stages of construction, commissioning, operation and decommissioning. The publication is directed to provide guidance for assessing the basic infrastructure necessary for: - A host country to consider when engaging in the implementation of nuclear power, and - A supplier country to consider when assessing whether the recipient country is in an acceptable condition to begin the implementation of a nuclear power project. The target users are decision makers, advisers and senior managers in the governmental organizations, utilities, industrial organizations and regulatory bodies in the countries adopting nuclear power programmes or exporting supplies for these programmes. The governmental organizations that may find this publication useful include: Ministries of Economy, Energy, Foreign Affairs, Finance, Mining, Internal Affairs, Academic Institutions, Nuclear Energy Agencies and Environmental Agencies. This publication was produced within the IAEA programme directed to increase the capability of Member States to plan and implement nuclear power programmes and to establish and enhance national nuclear infrastructure. This publication should be used in conjunction with the IAEA Safety Standards Series and other

  20. IFC and infrastructure - investing in power

    International Nuclear Information System (INIS)

    Chaudhry, Vijay

    1992-01-01

    Adequate infrastructure is essential to a country's growth. It provides a foundation which enables the economy to function. Until recently, most governments provided the physical infrastructure of industry: transport, communications, and power systems. Today, the trend is for governments to regulate monopolies while taking maximum advantage of private sector investment, decision-making and management. The private sector is increasingly being recognized as having the capacity to operate infrastructure projects more efficiently. (author)

  1. Electric vehicle charging infrastructure assignment and power grid impacts assessment in Beijing

    International Nuclear Information System (INIS)

    Liu, Jian

    2012-01-01

    This paper estimates the charging demand of an early electric vehicle (EV) market in Beijing and proposes an assignment model to distribute charging infrastructure. It finds that each type of charging infrastructure has its limitation, and integration is needed to offer a reliable charging service. It also reveals that the service radius of fast charging stations directly influences the final distribution pattern and an infrastructure deployment strategy with short service radius for fast charging stations has relatively fewer disturbances on the power grid. Additionally, although the adoption of electric vehicles will cause an additional electrical load on the Beijing's power grid, this additional load can be accommodated by the current grid's capacity via the charging time management and the battery swap strategy. - Highlight: ► Charging posts, fast charging stations, and battery swap stations should be integrated. ► Charging posts at home parking places will take a major role in a charging network. ► A service radius of 2 km is proposed for fast charging stations deployment. ► The additional charging load from EVs can be accommodated by charging time management.

  2. IAEA Reviews Niger’s Nuclear Power Infrastructure Development

    International Nuclear Information System (INIS)

    2018-01-01

    An International Atomic Energy Agency (IAEA) team of experts has concluded an eight-day mission to Niger to review its infrastructure development for a nuclear power programme. The Integrated Nuclear Infrastructure Review (INIR) was carried out at the invitation of the Government of the Republic of Niger. Niger, whose economic development is hampered by a lack of consistent electricity supply, is considering a potential role for nuclear power in its energy mix. A country of about 21 million people in Western Africa, Niger is currently ranked as the world’s fourth largest producer of uranium ore. The INIR team observed a strong Government commitment to developing the infrastructure for a nuclear power programme. The Government has established a Strategic Orientation Committee for the Nuclear Power Programme chaired by the Prime Minister, and a National Technical Committee for the Nuclear Power Programme chaired by the President of the Nigerien High Authority for Atomic Energy (HANEA). Those two committees form the Nuclear Energy Programme Implementing Organization (NEPIO). Niger has already completed or initiated several studies related to nuclear infrastructure development, and prepared a comprehensive report summarizing the results.

  3. Developing the necessary infrastructure. Chapter 1; IAEA activities in support of countries considering embarking on Nuclear Power Programme

    International Nuclear Information System (INIS)

    Akira, O.

    2010-01-01

    The IAEA supports in a variety of ways in establishing an appropriate infra-structure necessary to secure safe and reliable operation and still maintaining the international safeguards regime, especially in developing countries which are considering introduction of nuclear power programme. The TC projects to support introduction of nuclear power has been formulated and its number increased significantly recently. Various guidance documents have been published by the IAEA recently to enable progressive development of national infrastructure. The IAEA guidance documents constitute a basis of advises to newcomer countries. The recently formulated important mission is INIR mission to review the status of national infrastructure in the context of measuring the distance to the expected milestone. Finally, it is expected that the newcomers would make informed decision-making on going to nuclear power by fully understanding the necessary obligations and national long-term commitment, by confirming viability of nuclear power options in the country's energy plan through Energy Planning and long-term strategic assessment using IAEA guidance and tools

  4. Innovations in power systems reliability

    CERN Document Server

    Santora, Albert H; Vaccaro, Alfredo

    2011-01-01

    Electrical grids are among the world's most reliable systems, yet they still face a host of issues, from aging infrastructure to questions of resource distribution. Here is a comprehensive and systematic approach to tackling these contemporary challenges.

  5. Requirements for an evaluation infrastructure for reliable pervasive healthcare research

    DEFF Research Database (Denmark)

    Wagner, Stefan Rahr; Toftegaard, Thomas Skjødeberg; Bertelsen, Olav W.

    2012-01-01

    The need for a non-intrusive evaluation infrastructure platform to support research on reliable pervasive healthcare in the unsupervised setting is analyzed and challenges and possibilities are identified. A list of requirements is presented and a solution is suggested that would allow researchers...

  6. Algorithms for Bayesian network modeling and reliability assessment of infrastructure systems

    International Nuclear Information System (INIS)

    Tien, Iris; Der Kiureghian, Armen

    2016-01-01

    Novel algorithms are developed to enable the modeling of large, complex infrastructure systems as Bayesian networks (BNs). These include a compression algorithm that significantly reduces the memory storage required to construct the BN model, and an updating algorithm that performs inference on compressed matrices. These algorithms address one of the major obstacles to widespread use of BNs for system reliability assessment, namely the exponentially increasing amount of information that needs to be stored as the number of components in the system increases. The proposed compression and inference algorithms are described and applied to example systems to investigate their performance compared to that of existing algorithms. Orders of magnitude savings in memory storage requirement are demonstrated using the new algorithms, enabling BN modeling and reliability analysis of larger infrastructure systems. - Highlights: • Novel algorithms developed for Bayesian network modeling of infrastructure systems. • Algorithm presented to compress information in conditional probability tables. • Updating algorithm presented to perform inference on compressed matrices. • Algorithms applied to example systems to investigate their performance. • Orders of magnitude savings in memory storage requirement demonstrated.

  7. MEMS Reliability: Infrastructure, Test Structures, Experiments, and Failure Modes

    Energy Technology Data Exchange (ETDEWEB)

    TANNER,DANELLE M.; SMITH,NORMAN F.; IRWIN,LLOYD W.; EATON,WILLIAM P.; HELGESEN,KAREN SUE; CLEMENT,J. JOSEPH; MILLER,WILLIAM M.; MILLER,SAMUEL L.; DUGGER,MICHAEL T.; WALRAVEN,JEREMY A.; PETERSON,KENNETH A.

    2000-01-01

    The burgeoning new technology of Micro-Electro-Mechanical Systems (MEMS) shows great promise in the weapons arena. We can now conceive of micro-gyros, micro-surety systems, and micro-navigators that are extremely small and inexpensive. Do we want to use this new technology in critical applications such as nuclear weapons? This question drove us to understand the reliability and failure mechanisms of silicon surface-micromachined MEMS. Development of a testing infrastructure was a crucial step to perform reliability experiments on MEMS devices and will be reported here. In addition, reliability test structures have been designed and characterized. Many experiments were performed to investigate failure modes and specifically those in different environments (humidity, temperature, shock, vibration, and storage). A predictive reliability model for wear of rubbing surfaces in microengines was developed. The root causes of failure for operating and non-operating MEMS are discussed. The major failure mechanism for operating MEMS was wear of the polysilicon rubbing surfaces. Reliability design rules for future MEMS devices are established.

  8. Reliability of Power Electronic Converter Systems

    DEFF Research Database (Denmark)

    -link capacitance in power electronic converter systems; wind turbine systems; smart control strategies for improved reliability of power electronics system; lifetime modelling; power module lifetime test and state monitoring; tools for performance and reliability analysis of power electronics systems; fault...... for advancing the reliability, availability, system robustness, and maintainability of PECS at different levels of complexity. Drawing on the experience of an international team of experts, this book explores the reliability of PECS covering topics including an introduction to reliability engineering in power...... electronic converter systems; anomaly detection and remaining-life prediction for power electronics; reliability of DC-link capacitors in power electronic converters; reliability of power electronics packaging; modeling for life-time prediction of power semiconductor modules; minimization of DC...

  9. Time-Varying, Multi-Scale Adaptive System Reliability Analysis of Lifeline Infrastructure Networks

    Energy Technology Data Exchange (ETDEWEB)

    Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Kurtz, Nolan Scot [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-09-01

    The majority of current societal and economic needs world-wide are met by the existing networked, civil infrastructure. Because the cost of managing such infrastructure is high and increases with time, risk-informed decision making is essential for those with management responsibilities for these systems. To address such concerns, a methodology that accounts for new information, deterioration, component models, component importance, group importance, network reliability, hierarchical structure organization, and efficiency concerns has been developed. This methodology analyzes the use of new information through the lens of adaptive Importance Sampling for structural reliability problems. Deterioration, multi-scale bridge models, and time-variant component importance are investigated for a specific network. Furthermore, both bridge and pipeline networks are studied for group and component importance, as well as for hierarchical structures in the context of specific networks. Efficiency is the primary driver throughout this study. With this risk-informed approach, those responsible for management can address deteriorating infrastructure networks in an organized manner.

  10. Thermal-hydraulic R and D infrastructure for water cooled reactors of the Indian nuclear power program

    International Nuclear Information System (INIS)

    Vijayan, P.K.; Jain, V.; Saha, D.; Sinha, R.K.

    2009-01-01

    R and D has been the critical ingredient of Indian Nuclear Power Program from the very inception. Approach to R and D infrastructure has been closely associated with the three-stage nuclear power program that was crafted on the basis of available resources and technology in the short-term and energy security in the long-term. Early R and D efforts were directed at technologies relevant to Pressurized Heavy Water Reactors (PHWRs) which are currently the mainstay of Indian nuclear power program. Lately, the R and D program has been steered towards the design and development of advanced and innovative reactors with the twin objective of utilization of abundant thorium and to meet the future challenges to nuclear power such as enhanced safety and reliability, better economy, proliferation resistance etc. Advanced Heavy Water Reactor (AHWR) is an Indian innovative reactor currently being developed to realize the above objectives. Extensive R and D infrastructure has been created to validate the system design and various passive concepts being incorporated in the AHWR. This paper provides a brief review of R and D infrastructure that has been developed at Bhabha Atomic Research Centre for thermal-hydraulic investigations for water-cooled reactors of Indian nuclear power program. (author)

  11. Infrastructure development assistance modeling for nuclear power plant

    International Nuclear Information System (INIS)

    Park, J. H.; Hwang, K.; Park, K. M.; Kim, S. W.; Lee, S. M.

    2012-01-01

    The purpose of this paper is to develop a model, a general frame to be utilized in assisting newcomer countries to start a nuclear power program. A nuclear power plant project involves technical complexity and high level of investment with long duration. Considering newcomers are mostly developing countries that lack the national infrastructure, key infrastructure issues may constitute the principal constraints to the development of a nuclear power program. In this regard, it is important to provide guidance and support to set up an appropriate infrastructure when we help them with the first launch of nuclear power plant project. To date, as a sole nuclear power generation company, KHNP has been invited many times to mentor or assist newcomer countries for their successful start of a nuclear power program since Republic of Korea is an exemplary case of a developing country which began nuclear power program from scratch and became a major world nuclear energy country in a short period of time. Through hosting events organized to aid newcomer countries' initiation of nuclear power projects, difficulties have been recognized. Each event had different contents according to circumstances because they were held as an unstructured and one-off thing. By developing a general model, we can give more adequate and effective aid in an efficient way. In this paper, we created a model to identify necessary infrastructures at the right stage, which was mainly based on a case of Korea. Taking into account the assistance we received from foreign companies and our own efforts for technological self-reliance, we have developed a general time table and specified activities required to do at each stage. From a donor's perspective, we explored various ways to help nuclear infrastructure development including technical support programs, training courses, and participating in IAEA technical cooperation programs on a regular basis. If we further develop the model, the next task would be to

  12. Infrastructure development assistance modeling for nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. H.; Hwang, K.; Park, K. M.; Kim, S. W.; Lee, S. M. [Korea Hydro and Nuclear Power Co., LTD, 23, 106 gil, Yeongdong-daero, Gangnam-gu, 153-791 (Korea, Republic of)

    2012-07-01

    The purpose of this paper is to develop a model, a general frame to be utilized in assisting newcomer countries to start a nuclear power program. A nuclear power plant project involves technical complexity and high level of investment with long duration. Considering newcomers are mostly developing countries that lack the national infrastructure, key infrastructure issues may constitute the principal constraints to the development of a nuclear power program. In this regard, it is important to provide guidance and support to set up an appropriate infrastructure when we help them with the first launch of nuclear power plant project. To date, as a sole nuclear power generation company, KHNP has been invited many times to mentor or assist newcomer countries for their successful start of a nuclear power program since Republic of Korea is an exemplary case of a developing country which began nuclear power program from scratch and became a major world nuclear energy country in a short period of time. Through hosting events organized to aid newcomer countries' initiation of nuclear power projects, difficulties have been recognized. Each event had different contents according to circumstances because they were held as an unstructured and one-off thing. By developing a general model, we can give more adequate and effective aid in an efficient way. In this paper, we created a model to identify necessary infrastructures at the right stage, which was mainly based on a case of Korea. Taking into account the assistance we received from foreign companies and our own efforts for technological self-reliance, we have developed a general time table and specified activities required to do at each stage. From a donor's perspective, we explored various ways to help nuclear infrastructure development including technical support programs, training courses, and participating in IAEA technical cooperation programs on a regular basis. If we further develop the model, the next task

  13. Capacity and reliability analyses with applications to power quality

    Science.gov (United States)

    Azam, Mohammad; Tu, Fang; Shlapak, Yuri; Kirubarajan, Thiagalingam; Pattipati, Krishna R.; Karanam, Rajaiah

    2001-07-01

    The deregulation of energy markets, the ongoing advances in communication networks, the proliferation of intelligent metering and protective power devices, and the standardization of software/hardware interfaces are creating a dramatic shift in the way facilities acquire and utilize information about their power usage. The currently available power management systems gather a vast amount of information in the form of power usage, voltages, currents, and their time-dependent waveforms from a variety of devices (for example, circuit breakers, transformers, energy and power quality meters, protective relays, programmable logic controllers, motor control centers). What is lacking is an information processing and decision support infrastructure to harness this voluminous information into usable operational and management knowledge to handle the health of their equipment and power quality, minimize downtime and outages, and to optimize operations to improve productivity. This paper considers the problem of evaluating the capacity and reliability analyses of power systems with very high availability requirements (e.g., systems providing energy to data centers and communication networks with desired availability of up to 0.9999999). The real-time capacity and margin analysis helps operators to plan for additional loads and to schedule repair/replacement activities. The reliability analysis, based on computationally efficient sum of disjoint products, enables analysts to decide the optimum levels of redundancy, aids operators in prioritizing the maintenance options for a given budget and monitoring the system for capacity margin. The resulting analytical and software tool is demonstrated on a sample data center.

  14. Bayesian updating of reliability of civil infrastructure facilities based on condition-state data and fault-tree model

    International Nuclear Information System (INIS)

    Ching Jianye; Leu, S.-S.

    2009-01-01

    This paper considers a difficult but practical circumstance of civil infrastructure management-deterioration/failure data of the infrastructure system are absent while only condition-state data of its components are available. The goal is to develop a framework for estimating time-varying reliabilities of civil infrastructure facilities under such a circumstance. A novel method of analyzing time-varying condition-state data that only reports operational/non-operational status of the components is proposed to update the reliabilities of civil infrastructure facilities. The proposed method assumes that the degradation arrivals can be modeled as a Poisson process with unknown time-varying arrival rate and damage impact and that the target system can be represented as a fault-tree model. To accommodate large uncertainties, a Bayesian algorithm is proposed, and the reliability of the infrastructure system can be quickly updated based on the condition-state data. Use of the new method is demonstrated with a real-world example of hydraulic spillway gate system.

  15. 78 FR 72755 - Version 5 Critical Infrastructure Protection Reliability Standards

    Science.gov (United States)

    2013-12-03

    ... impact on Bulk-Power System reliability. However, the Commission is concerned that the proposed language... focus on the reliability and security of the Bulk Power System.'' \\26\\ Accordingly, NERC requests that...-002-5 through CIP-011-1, submitted by the North American Electric Reliability Corporation (NERC), the...

  16. Reliability issues related to the usage of Cloud Computing in Critical Infrastructures

    OpenAIRE

    Diez Gonzalez, Oscar Manuel; Silva Vazquez, Andrés

    2011-01-01

    The use of cloud computing is extending to all kind of systems, including the ones that are part of Critical Infrastructures, and measuring the reliability is becoming more difficult. Computing is becoming the 5th utility, in part thanks to the use of cloud services. Cloud computing is used now by all types of systems and organizations, including critical infrastructure, creating hidden inter-dependencies on both public and private cloud models. This paper investigates the use of cloud co...

  17. 78 FR 24107 - Version 5 Critical Infrastructure Protection Reliability Standards

    Science.gov (United States)

    2013-04-24

    ...-Power System.\\6\\ In Order No. 706, the Commission approved eight CIP Reliability Standards (CIP-002-1... documentation requirements to allow entities to focus on the reliability and security of the Bulk Power System... reliability of the bulk electric system. Requirement R1 includes controls to protect data that would be useful...

  18. Nuclear power infrastructure - issues, strategy and possibilities

    International Nuclear Information System (INIS)

    Sokolov, Y.A.

    2009-01-01

    Full text: Today humanity faces daunting challenges: the pressing need for development in many parts of the world and the desire for a more effective system of international security. At the outset of the 21st century, the Millennium Development Goals and the Johannesburg Plan of Implementation have both set global objectives for sustainable development (SD) that give high priority to the eradication of poverty and hunger, environmental sustainability, universal access to plentiful fresh water and energy. In this context there are many expectations about Nuclear Renascence supported by many national and international studies, by discussions in the mass media and international forums, etc. The Agency has taken an integrated approach outlining all considerations that have to be taken into account for the introduction of a nuclear power programme, providing guiding documents, forums for sharing information, consultancies and technical meetings and sending multidisciplinary teams to countries requesting assistance with nuclear power infrastructure. The process also includes specific assistance and review services in the areas of infrastructure readiness, feasibility studies, draft nuclear law, regulatory frameworks and organization, siting issues, human resource development and planning, bid evaluation and technology assessment, owner/operator competence, and safety and security. It is important to support the decision making processes of States introducing nuclear power to ensure they can make informed choices on the role of nuclear power in their energy mixes. The IAEA helps countries prepare for the introduction or expansion of nuclear power by 1) helping them ensure that nuclear energy is used safely, securely and with minimal proliferation risk, and 2) meeting the need of developing countries to build capacity in terms of human resources, energy analysis, regulatory capabilities and other infrastructure necessary for nuclear power. The process also includes

  19. SimWIND: A geospatial infrastructure model for optimizing wind power generation and transmission

    International Nuclear Information System (INIS)

    Phillips, Benjamin R.; Middleton, Richard S.

    2012-01-01

    Wind is a clean, enduring energy resource with the capacity to satisfy 20% or more of U.S. electricity demand. Presently, wind potential is limited by a paucity of electrical transmission lines and/or capacity between promising wind resources and primary load centers. We present the model SimWIND to address this shortfall. SimWIND is an integrated optimization model for the geospatial arrangement and cost minimization of wind-power generation–transmission–delivery infrastructure. Given a set of possible wind-farm sites, the model simultaneously determines (1) where and how much power to generate and (2) where to build new transmission infrastructure and with what capacity in order to minimize the cost for delivering a targeted amount of power to load. Costs and routing of transmission lines consider geographic and social constraints as well as electricity losses. We apply our model to the Electric Reliability Council of Texas (ERCOT) Interconnection, considering scenarios that deliver up to 20 GW of new wind power. We show that SimWIND could potentially reduce ERCOT's projected ∼$5B transmission network upgrade line length and associated costs by 50%. These results suggest that SimWIND's coupled generation–transmission–delivery modeling approach could play a critical role in enhancing planning efforts and reducing costs for wind energy integration. - Highlights: ► Wind power is limited by transmission capacity between resources and demands. ► SimWIND is a coupled generation-transmission-delivery model for wind infrastructure. ► The model minimizes costs considering realistic transmission routing and networking. ► We show that SimWIND could save 50% of $5B costs for expanding the Texas grid. ► Results suggest SimWIND may play a critical role in enhancings wind planning efforts.

  20. Wireless Infrastructure M2M Network For Distributed Power Grid Monitoring.

    Science.gov (United States)

    Gharavi, Hamid; Hu, Bin

    2017-01-01

    With the massive integration of distributed renewable energy sources (RESs) into the power system, the demand for timely and reliable network quality monitoring, control, and fault analysis is rapidly growing. Following the successful deployment of Phasor Measurement Units (PMUs) in transmission systems for power monitoring, a new opportunity to utilize PMU measurement data for power quality assessment in distribution grid systems is emerging. The main problem however, is that a distribution grid system does not normally have the support of an infrastructure network. Therefore, the main objective in this paper is to develop a Machine-to-Machine (M2M) communication network that can support wide ranging sensory data, including high rate synchrophasor data for real-time communication. In particular, we evaluate the suitability of the emerging IEEE 802.11ah standard by exploiting its important features, such as classifying the power grid sensory data into different categories according to their traffic characteristics. For performance evaluation we use our hardware in the loop grid communication network testbed to access the performance of the network.

  1. Maintenance management of railway infrastructures based on reliability analysis

    International Nuclear Information System (INIS)

    Macchi, Marco; Garetti, Marco; Centrone, Domenico; Fumagalli, Luca; Piero Pavirani, Gian

    2012-01-01

    Railway infrastructure maintenance plays a crucial role for rail transport. It aims at guaranteeing safety of operations and availability of railway tracks and related equipment for traffic regulation. Moreover, it is one major cost for rail transport operations. Thus, the increased competition in traffic market is asking for maintenance improvement, aiming at the reduction of maintenance expenditures while keeping the safety of operations. This issue is addressed by the methodology presented in the paper. The first step of the methodology consists of a family-based approach for the equipment reliability analysis; its purpose is the identification of families of railway items which can be given the same reliability targets. The second step builds the reliability model of the railway system for identifying the most critical items, given a required service level for the transportation system. The two methods have been implemented and tested in practical case studies, in the context of Rete Ferroviaria Italiana, the Italian public limited company for railway transportation.

  2. Intelligent social infrastructure technology. Infrastructure technology support ultra-reliable society; Chiteki shakai kiban kogaku gijutsu. Choanshin shakai wo sasaeru kiban gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This survey was conducted to construct the core of intelligent social infrastructure technology (ISIT), and to investigate its practical application to industries and society. For realizing the ultra-safe and ultra-reliable society, it is necessary to develop the ISIT which can integrate various social infrastructures, such as architecture, city, energy, and lifeline systems required for living. For the systematization of cities, it is necessary to process and control the intelligent information by holding integrated and transverse information in common, as to logistics, lifeline, communication, monitoring, and control. For the communication engineering, the centralized systems are acceleratingly to be converted into the distributed network systems. For the mechanical engineering, intelligent control and robot technology are required. For the architectural engineering, a concept exceeding the conventional antiseismic structure idea is investigated. It is necessary to develop a new information technology providing an intelligent social infrastructures by merging the information networks and the physical world seamlessly. Necessity of ISIT is large for constructing the intelligent and ultra-reliable society consisting of these integrated and organized networks. 84 refs., 68 figs., 6 tabs.

  3. Design for Reliability of Power Electronic Systems

    DEFF Research Database (Denmark)

    Wang, Huai; Ma, Ke; Blaabjerg, Frede

    2012-01-01

    Advances in power electronics enable efficient and flexible processing of electric power in the application of renewable energy sources, electric vehicles, adjustable-speed drives, etc. More and more efforts are devoted to better power electronic systems in terms of reliability to ensure high......). A collection of methodologies based on Physics-of-Failure (PoF) approach and mission profile analysis are presented in this paper to perform reliability-oriented design of power electronic systems. The corresponding design procedures and reliability prediction models are provided. Further on, a case study...... on a 2.3 MW wind power converter is discussed with emphasis on the reliability critical components IGBTs. Different aspects of improving the reliability of the power converter are mapped. Finally, the challenges and opportunities to achieve more reliable power electronic systems are addressed....

  4. Reliability analysis techniques in power plant design

    International Nuclear Information System (INIS)

    Chang, N.E.

    1981-01-01

    An overview of reliability analysis techniques is presented as applied to power plant design. The key terms, power plant performance, reliability, availability and maintainability are defined. Reliability modeling, methods of analysis and component reliability data are briefly reviewed. Application of reliability analysis techniques from a design engineering approach to improving power plant productivity is discussed. (author)

  5. The European power plant infrastructure-Presentation of the Chalmers energy infrastructure database with applications

    International Nuclear Information System (INIS)

    Kjaerstad, Jan; Johnsson, Filip

    2007-01-01

    This paper presents a newly established database of the European power plant infrastructure (power plants, fuel infrastructure, fuel resources and CO 2 storage options) for the EU25 member states (MS) and applies the database in a general discussion of the European power plant and natural gas infrastructure as well as in a simple simulation analysis of British and German power generation up to the year 2050 with respect to phase-out of existing generation capacity, fuel mix and fuel dependency. The results are discussed with respect to age structure of the current production plants, CO 2 emissions, natural gas dependency and CO 2 capture and storage (CCS) under stringent CO 2 emission constraints. The analysis of the information from the power plant database, which includes planned projects, shows large variations in power plant infrastructure between the MS and a clear shift to natural gas-fuelled power plants during the last decade. The data indicates that this shift may continue in the short-term up to 2010 since the majority of planned plants are natural gas fired. The gas plants are, however, geographically concentrated to southern and northwest Europe. The data also shows large activities in the upstream gas sector to accommodate the ongoing shift to gas with pipelines, liquefaction plants and regasification terminals being built and gas fields being prepared for production. At the same time, utilities are integrating upwards in the fuel chain in order to secure supply while oil and gas companies are moving downwards the fuel chain to secure access to markets. However, it is not yet possible to state whether the ongoing shift to natural gas will continue in the medium term, i.e. after 2010, since this will depend on a number of factors as specified below. Recently there have also been announcements for construction of a number of new coal plants. The results of the simulations for the German and British power sector show that combination of a relatively low

  6. Climate Vulnerability of Hydro-power infrastructure in the Eastern African Power Pool

    Science.gov (United States)

    Sridharan, Vignesh

    2017-04-01

    At present there is around 6000 MW of installed hydropower capacity in the Eastern African power pool (EAPP)[1]. With countries aggressively planning to achieve the Sustainable development goal (SDG) of ensuring access to affordable electricity for all, a three-fold increase in hydropower capacity is expected by 2040 [1]. Most of the existing and planned infrastructure lie inside the Nile River Basin. The latest assessment report (AR 5) from the Intergovernmental Panel on Climate Change (IPCC) indicates a high level of climatic uncertainty in the Nile Basin. The Climate Moisture index (CMI) for the Eastern Nile region and the Nile Equatorial lakes varies significantly across the different General Circulation Models (GCM)[2]. Such high uncertainty casts a shadow on the plans to expand hydropower capacity, doubting whether hydropower expansion can contribute to the goal of improving access to electricity or end up as sunk investments. In this assessment, we analyze adaptation strategies for national energy systems in the Eastern African Power Pool (EAPP), which minimize the regret that could potentially arise from impacts of a changed climate. An energy systems model of the EAPP is developed representing national electricity supply infrastructure. Cross border transmission and hydropower infrastructure is defined at individual project level. The energy systems model is coupled with a water systems management model of the Nile River Basin that calculates the water availability at different hydropower infrastructures under a range of climate scenarios. The results suggest that a robust adaptation strategy consisting of investments in cross border electricity transmission infrastructure and diversifying sources of electricity supply will require additional investments of USD 4.2 billion by 2050. However, this leads to fuel and operational cost savings of up to USD 22.6 billion, depending on the climate scenario. [1] "Platts, 2016. World Electric Power Plants Database

  7. Power system reliability analysis using fault trees

    International Nuclear Information System (INIS)

    Volkanovski, A.; Cepin, M.; Mavko, B.

    2006-01-01

    The power system reliability analysis method is developed from the aspect of reliable delivery of electrical energy to customers. The method is developed based on the fault tree analysis, which is widely applied in the Probabilistic Safety Assessment (PSA). The method is adapted for the power system reliability analysis. The method is developed in a way that only the basic reliability parameters of the analysed power system are necessary as an input for the calculation of reliability indices of the system. The modeling and analysis was performed on an example power system consisting of eight substations. The results include the level of reliability of current power system configuration, the combinations of component failures resulting in a failed power delivery to loads, and the importance factors for components and subsystems. (author)

  8. Problem of nuclear power plant reliability

    International Nuclear Information System (INIS)

    Popyrin, L.S.; Nefedov, Yu.V.

    1989-01-01

    The problem of substantiation of rational and methods of ensurance of NPP reliability at the stage of its designing has been studied. It is shown that the optimal level of NPP reliability is determined by coordinating solution of the proiblems for optimization of reliability of power industry, heat and power supply and nuclear power generation systems comprising NPP, and problems of reliability optimization of NPP proper, as a complex engineering system. The conclusion is made that the greatest attention should be paid to the development of mathematical models of reliability, taking into account different methods of equipment redundancy, as well as dependence of failures on barious factors, improvement of NPP reliability indices, development of data base, working out of the complec of consistent standards of reliability. 230 refs.; 2 figs.; 1 tab

  9. Power Electronics Packaging Reliability | Transportation Research | NREL

    Science.gov (United States)

    Packaging Reliability Power Electronics Packaging Reliability A photo of a piece of power electronics laboratory equipment. NREL power electronics packaging reliability research investigates the electronics packaging around a semiconductor switching device determines the electrical, thermal, and

  10. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Emmanuel [Energetics, Inc., Columbia, MD (United States)

    2018-02-01

    findings and research suggestions discussed at the event. Discussions at the workshop will aid DOE in developing a set of distinct initiatives that can be pursued by government and industry to realize promising technological pursuits. DOE plans to use the results of the Dialogue coupled with ongoing technical analysis of efficiency opportunities within the coal-fired fleet, and additional studies to develop a comprehensive strategy for capitalizing on thermal efficiency improvements. Expected Power Plant Efficiency Improvements include developing cost-effective, efficient, and reliable technologies for boilers, turbines, and sensors and controls to improve the reliability and efficiency of existing coal-based power plants. The Office of Fossil Energy at DOE plans to work with industry to develop knowledge pertaining to advanced technologies and systems that industry can subsequently develop. These technologies and systems will increase reliability, add operational flexibility and improve efficiency, thereby providing more robust power generation infrastructure. The following table lists the research suggestions and questions for further investigation that were identified by participants in each session of the dialogue.

  11. Power peaking nuclear reliability factors

    International Nuclear Information System (INIS)

    Hassan, H.A.; Pegram, J.W.; Mays, C.W.; Romano, J.J.; Woods, J.J.; Warren, H.D.

    1977-11-01

    The Calculational Nuclear Reliability Factor (CNRF) assigned to the limiting power density calculated in reactor design has been determined. The CNRF is presented as a function of the relative power density of the fuel assembly and its radial local. In addition, the Measurement Nuclear Reliability Factor (MNRF) for the measured peak hot pellet power in the core has been evaluated. This MNRF is also presented as a function of the relative power density and radial local within the fuel assembly

  12. Power transformer reliability modelling

    NARCIS (Netherlands)

    Schijndel, van A.

    2010-01-01

    Problem description Electrical power grids serve to transport and distribute electrical power with high reliability and availability at acceptable costs and risks. These grids play a crucial though preferably invisible role in supplying sufficient power in a convenient form. Today’s society has

  13. Technical Meeting/Workshop on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for Nuclear Power Plants. Presentations

    International Nuclear Information System (INIS)

    2012-01-01

    The main purpose of the TM/Workshop is to provide an opportunity for exchange of specific information on the management of the development of a sustainable national infrastructure for Nuclear Power Plants as it is recommended in the Agency's Milestones approach. Taking into account the actual status of new nuclear power programmes in Member States, this Agency event shall focus on the moving beyond the consideration of the nuclear power and advancing to the next phase, when future partners (Consultants, NPP Vendors, EPC Contractors, etc.) shall be selected and contracted for the first Nuclear Power Plant. The objectives of the Technical Meeting/Workshop are the following: 1. To exchange specific information and to facilitate the management and coordination of the development and implementation of a national infrastructure for nuclear power; 2. To present and discuss case studies, good practices and lessons learned about recent experiences in implementing an appropriate infrastructure for nuclear power, including management methods and self-evaluation processes; 3. To allow participants to improve their knowledge of various aspects of nuclear infrastructure development; and 4. To provide a forum in which participants can discuss common challenges, opportunities for cooperation, concerns and issues their countries face in the infrastructure implementation process.

  14. Improving Power Converter Reliability

    DEFF Research Database (Denmark)

    Ghimire, Pramod; de Vega, Angel Ruiz; Beczkowski, Szymon

    2014-01-01

    of a high-power IGBT module during converter operation, which may play a vital role in improving the reliability of the power converters. The measured voltage is used to estimate the module average junction temperature of the high and low-voltage side of a half-bridge IGBT separately in every fundamental......The real-time junction temperature monitoring of a high-power insulated-gate bipolar transistor (IGBT) module is important to increase the overall reliability of power converters for industrial applications. This article proposes a new method to measure the on-state collector?emitter voltage...... is measured in a wind power converter at a low fundamental frequency. To illustrate more, the test method as well as the performance of the measurement circuit are also presented. This measurement is also useful to indicate failure mechanisms such as bond wire lift-off and solder layer degradation...

  15. Managing relationships between electric power industry restructuring and grid reliability

    International Nuclear Information System (INIS)

    Thomas, R.J.

    2005-01-01

    The electricity system is a critical infrastructure, and its continued and reliable functioning is essential to the nation's economy and well-being. However, the inter-dependency of electricity networks is not completely understood. The economic impact of outages was discussed in this white paper. It was suggested that moving to a restructured environment has degraded the reliability of the bulk system. New institutional arrangements and approaches to information management are needed. It was suggested that reliability practices caused the 2003 blackout, and not technical failures. Uncertainties in the restructured market were discussed, as well as incentives to maintain system adequacy. Examples of deregulation in other countries were presented. Organizational complexities were reviewed, including the Federal Energy Regulatory Commission's (FERC) requirements and the new layers of complexity that have been added to the decision-making process in the light of restructuring. Planning and connectivity issues were reviewed. The need for design standards in power grid control centres was discussed. Difficulties in collecting data from different control centres were considered. Issues concerning the lack of investment in research and development were discussed, with particular reference to the urgent need for coordinated research programs. The looming manpower crisis in the electric power industry was also discussed. Recommendations included ensuring that the transmission system can support a market structure; building a national reliability centre; solving the manpower crisis; and testing market designs before deploying them. It was concluded that good engineering design principles, including experimental economic testing, should be required of any new electricity market design before authorizing its use. 31 refs., 1 tab., 6 figs

  16. Thailand: Infrastructure Development and Challenges to Launch Nuclear Power Programme

    International Nuclear Information System (INIS)

    Keinmeesuke, Sirichai

    2011-01-01

    In June 2007, the cabinet passed a resolution for Thailand's Power Development Plan (PDP 2007). It was mentioned in the plan that Thailand will have 2 x 1,000 MWe nuclear power plants in 2020 and another 2 x 1,000 MWe in 2021. The PDP 2007 was revised in March 2009 and it was agreed to change the nuclear power generation to only 1 x 1,000 MWe in 2020 and 2021 respectively due to the large excess capacity at present. Many activities related to development of infrastructures in order to support electricity generation using nuclear power are being executed. Milestones for nuclear power program implementation has been developed using the IAEA document 'Milestones in the Development of a National Infrastructure for Nuclear Power' with some amendment/additions to suit the country situation. According to the schedule, a lot of activities related to infrastructure establishment, feasibility study, utility preparation and public education and participation are being performed. Within the year 2011, various issues such as legal and regulatory systems and international commitment, industrial and commercial infrastructure, technology transfer and human resource development, safety and environmental protection, public information and public acceptance, preparation of the nuclear power utility establishment, etc. must be solved out and undertaken to assure the cabinet to make final decision to go nuclear. There are many challenges for Thailand embarking of the nuclear power programme. It is essential to plan for the establishment of a regulatory body at the national level to support and regulate the nuclear power plant industry. Currently, the application for a license and the monitoring of a power plant are administered by the authorities of various agencies under different ministries; hence the process is very time-consuming and overlaps with one another. The approach that the regulatory body and the authorities to issue licenses relevant to the nuclear power plant operation

  17. Infrastructure needs and organizational aspect of nuclear power programme

    International Nuclear Information System (INIS)

    Villanueva, M.S.

    1996-01-01

    I. Introduction. II. Infrastructure development for nuclear power program: a) pre-requisites and requirements for a nuclear power program; b) long-term national policy for a nuclear power (long-term policy reason; national commitment); c) manpower development (role of academic institutions; practical manpower training); d) laws and regulations (regulatory framework; main national laws and regulations); e) nuclear research and development implementation (researches in the university; long term nuclear R and D program; research reactors); f) functions of government organizations (Atomic Energy Commission (PNRI); Department of Science and Technology; Department of Energy; Department of Education and Culture); g) industrial infrastructure; h) technology transfer (recipients's preparedness); i) safeguards obligations; j) public acceptance activities. III. Stages of nuclear power development (stage 1: planning; stage 2: detailed study and procurement; stage 3: construction; stage 4: operation) IV. Conclusion/Recommendation. (author)

  18. Advanced Wireless Power Transfer Vehicle and Infrastructure Analysis (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Gonder, J.; Brooker, A.; Burton, E.; Wang, J.; Konan, A.

    2014-06-01

    This presentation discusses current research at NREL on advanced wireless power transfer vehicle and infrastructure analysis. The potential benefits of E-roadway include more electrified driving miles from battery electric vehicles, plug-in hybrid electric vehicles, or even properly equipped hybrid electric vehicles (i.e., more electrified miles could be obtained from a given battery size, or electrified driving miles could be maintained while using smaller and less expensive batteries, thereby increasing cost competitiveness and potential market penetration). The system optimization aspect is key given the potential impact of this technology on the vehicles, the power grid and the road infrastructure.

  19. Photovoltaic power system reliability considerations

    Science.gov (United States)

    Lalli, V. R.

    1980-01-01

    This paper describes an example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems. This particular application was for a solar cell power system demonstration project in Tangaye, Upper Volta, Africa. The techniques involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of a fail-safe and planned spare parts engineering philosophy.

  20. Ontario-U.S. power outages : impacts on critical infrastructure

    International Nuclear Information System (INIS)

    2006-01-01

    This paper described the power outage and resulting blackout that occurred on August 14, 2003 and identified how critical infrastructure was directly and interdependently impacted in Canada. The aim of the paper was to assist critical infrastructure protection and emergency management professionals in assessing the potential impacts of large-scale critical infrastructure disruptions. Information for the study was acquired from Canadian and American media reports and cross-sectoral information sharing with provincial and federal governments and the private sector. The blackout impacted most of the sources and means of generating, transmitting and distributing power within the area, which in turn impacted all critical infrastructure sectors. Landline and cellular companies experienced operational difficulties, which meant that emergency responders were impacted. Newspapers and the electronic media struggled to release information to the public. The banking and finance industry experienced an immediate degradation of services. The power outage caused shipping and storage difficulties for commercial retailers and dairy producers. A number of incidents were reported where only partially treated waste water was released into neighbouring waterways. The timing of the blackout coincided with the closures of workplaces and created additional difficulties on transportation networks. Many gas station pumps were inoperable. Police, fire departments and ambulance services experienced a dramatic increase in the volume of calls received, and all branches of the emergency services sector encountered transportation delays and difficulties with communications equipment. Nuclear reactors were also impacted. An estimated 150,000 Government of Canada employees were unable to report to work. Estimates have indicated that the power outage cost Ontario's economy between $1 and $2 billion. The outage negatively impacted 82 per cent of small businesses in Ontario. 170 refs., 3 figs

  1. Reliability-cost models for the power switching devices of wind power converters

    DEFF Research Database (Denmark)

    Ma, Ke; Blaabjerg, Frede

    2012-01-01

    In order to satisfy the growing reliability requirements for the wind power converters with more cost-effective solution, the target of this paper is to establish a new reliability-cost model which can connect the relationship between reliability performances and corresponding semiconductor cost...... temperature mean value Tm and fluctuation amplitude ΔTj of power devices, are presented. With the proposed reliability-cost model, it is possible to enable future reliability-oriented design of the power switching devices for wind power converters, and also an evaluation benchmark for different wind power...... for power switching devices. First the conduction loss, switching loss as well as thermal impedance models of power switching devices (IGBT module) are related to the semiconductor chip number information respectively. Afterwards simplified analytical solutions, which can directly extract the junction...

  2. Reliability evaluation of power systems

    CERN Document Server

    Billinton, Roy

    1996-01-01

    The Second Edition of this well-received textbook presents over a decade of new research in power system reliability-while maintaining the general concept, structure, and style of the original volume. This edition features new chapters on the growing areas of Monte Carlo simulation and reliability economics. In addition, chapters cover the latest developments in techniques and their application to real problems. The text also explores the progress occurring in the structure, planning, and operation of real power systems due to changing ownership, regulation, and access. This work serves as a companion volume to Reliability Evaluation of Engineering Systems: Second Edition (1992).

  3. Reliable LED Lighting Technologies: Key Factors and Procurement Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Lynn; Arquit Niederberger, Anne

    2015-10-08

    Abstract— Lighting systems have the ability to transform the economic and educational infrastructure of disadvantaged communities, and eradicating “light poverty” has become one of the primary goals of the International Year of Light 2015. Solid-state lighting (SSL) technology, based on light-emitting diode (LED) light sources, has emerged as the next generation of lighting technology, with a current global market penetration of roughly 5%. This paper will report on recent research on understanding SSL lighting system reliability (failure modes, environmental stressors, electrical power quality); discuss the implications of SSL technology reliability for providing lighting services; and suggest practical approaches to ensure SSL reliability to benefit humanity. Among the key findings from this work is that LED sources can be extremely reliable, withstanding a broad range of environmental stresses without failure. Nonetheless, SSL lighting systems can have a negative impact on electrical power reliability, as well as on the affordability of lighting services, without attention to the quality of the accompanying power infrastructure. It is therefore critical to ensure that the performance of the power supply electronics used in lighting systems is matched to the quality of the power source, when evaluating energy efficient lighting choices.

  4. Power electronics reliability analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Mark A.; Atcitty, Stanley

    2009-12-01

    This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

  5. Applicability of the proposed evaluation method for social infrastructures to nuclear power plants

    International Nuclear Information System (INIS)

    Ichimura, Tomiyasu

    2015-01-01

    This study proposes an evaluation method for social infrastructures, and verifies the applicability of the proposed evaluation method to social infrastructures by applying it to nuclear power plants, which belong to social infrastructures. In the proposed evaluation method for social infrastructures, the authors chose four evaluation viewpoints and proposed common evaluation standards for the evaluation indexes obtained from each viewpoint. By applying this system to the evaluation of nuclear power plants, the evaluation index examples were obtained from the evaluation viewpoints. Furthermore, when the level of the common evaluation standards of the proposed evaluation method was applied to the evaluation of the activities of nuclear power plants based on the regulations, it was confirmed that these activities are at the highest level. Through this application validation, it was clarified that the proposed evaluation method for social infrastructures had certain effectiveness. The four evaluation viewpoints are 'service,' 'environment,' 'action factor,' and 'operation and management.' Part of the application examples to a nuclear power plant are as follows: (1) in the viewpoint of service: the operation rate of the power plant, and operation costs, and (2) in the viewpoint of environment: external influence related to nuclear waste and radioactivity, and external effect related to cooling water. (A.O.)

  6. RELIABILITY ANALYSIS OF POWER DISTRIBUTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    Popescu V.S.

    2012-04-01

    Full Text Available Power distribution systems are basic parts of power systems and reliability of these systems at present is a key issue for power engineering development and requires special attention. Operation of distribution systems is accompanied by a number of factors that produce random data a large number of unplanned interruptions. Research has shown that the predominant factors that have a significant influence on the reliability of distribution systems are: weather conditions (39.7%, defects in equipment(25% and unknown random factors (20.1%. In the article is studied the influence of random behavior and are presented estimations of reliability of predominantly rural electrical distribution systems.

  7. Extreme storms, sea level rise, and coastal change: implications for infrastructure reliability in the Gulf of Mexico

    Science.gov (United States)

    Anarde, K.; Kameshwar, S.; Irza, N.; Lorenzo-Trueba, J.; Nittrouer, J. A.; Padgett, J.; Bedient, P. B.

    2016-12-01

    Predicting coastal infrastructure reliability during hurricane events is important for risk-based design and disaster planning, such as delineating viable emergency response routes. Previous research has focused on either infrastructure vulnerability to coastal flooding or the impact of changing sea level and landforms on surge dynamics. Here we investigate the combined impact of sea level, morphology, and coastal flooding on the reliability of highway bridges - the only access points between barrier islands and mainland communities - during future extreme storms. We forward model coastal flooding for static projections of geomorphic change using ADCIRC+SWAN. First-order parameters that are adjusted include sea level and elevation. These are varied for each storm simulation to evaluate relative impact on the reliability of bridges surrounding Freeport, TX. Simulated storms include both synthetic and historical events, which are classified by intensity using the storm's integrated kinetic energy, a metric for surge generation potential. Reliability is estimated through probability of failure - given wave and surge loads - and time inundated. Findings include that: 1) bridge reliability scales inversely with surge height, and 2) sea level rise reduces bridge reliability due to a monotonic increase in surge height. The impact of a shifting landscape on bridge reliability is more complex: barrier island rollback can increase or decrease inundation times for storms of different intensity due to changes in wind-setup and back-barrier bay interactions. Initial storm surge readily inundates the coastal landscape during large intensity storms, however the draining of inland bays following storm passage is significantly impeded by the barrier. From a coastal engineering standpoint, we determine that to protect critical infrastructure, efforts now implemented that nourish low-lying barriers may be enhanced by also armoring back-bay coastlines and elevating bridge approach

  8. Reliability Model of Power Transformer with ONAN Cooling

    OpenAIRE

    M. Sefidgaran; M. Mirzaie; A. Ebrahimzadeh

    2010-01-01

    Reliability of a power system is considerably influenced by its equipments. Power transformers are one of the most critical and expensive equipments of a power system and their proper functions are vital for the substations and utilities. Therefore, reliability model of power transformer is very important in the risk assessment of the engineering systems. This model shows the characteristics and functions of a transformer in the power system. In this paper the reliability model...

  9. Reliability of the emergency AC power system at nuclear power plants

    International Nuclear Information System (INIS)

    Battle, R.E.; Campbell, D.J.; Baranowsky, P.W.

    1983-01-01

    The reliability of the emergency ac power systems typical of most nuclear power plants was estimated, and the cost and increase in reliability for several improvements were estimated. Fault trees were constructed based on a detailed design review of the emergency ac power systems of 18 nuclear plants. The failure probabilities used in the fault trees were calculated from extensive historical data collected from Licensee Event Reports (LERs) and from operating experience information obtained from nuclear plant licensees. No one or two improvements can be made at all plants to significantly increase the industry-average emergency ac power system reliability; rather the most beneficial improvements are varied and plant specific. Improvements in reliability and the associated costs are estimated using plant specific designs and failure probabilities

  10. French power system reliability report 2008

    International Nuclear Information System (INIS)

    Tesseron, J.M.

    2009-06-01

    The reliability of the French power system was fully under control in 2008, despite the power outage in the eastern part of the Provence-Alpes-Cote d'Azur region on November 3, which had been dreaded for several years, since it had not been possible to set up a structurally adequate network. Pursuant to a consultation meeting, the reinforcement solution proposed by RTE was approved by the Minister of Energy, boding well for greater reliability in future. Based on the observations presented in this 2008 Report, RTE's Power System Reliability Audit Mission considers that no new recommendations are needed beyond those expressed in previous reliability reports and during reliability audits. The publication of this yearly report is in keeping with RTE's goal to promote the follow-up over time of the evolution of reliability in its various aspects. RTE thus aims to contribute to the development of reliability culture, by encouraging an improved assessment by the different players (both RTE and network users) of the role they play in building reliability, and by advocating the taking into account of reliability and benchmarking in the European organisations of Transmission System Operators. Contents: 1 - Brief overview of the evolution of the internal and external environment; 2 - Operating situations encountered: climatic conditions, supply / demand balance management, operation of interconnections, management of internal congestion, contingencies affecting the transmission facilities; 3 - Evolution of the reliability reference guide: external reference guide: directives, laws, decrees, etc, ETSO, UCTE, ENTSO-E, contracting contributing to reliability, RTE internal reference guide; 4 - Evolution of measures contributing to reliability in the equipment field: intrinsic performances of components (generating sets, protection systems, operation PLC's, instrumentation and control, automatic frequency and voltage controls, transmission facilities, control systems, load

  11. Reliability Characteristics of Power Plants

    Directory of Open Access Journals (Sweden)

    Zbynek Martinek

    2017-01-01

    Full Text Available This paper describes the phenomenon of reliability of power plants. It gives an explanation of the terms connected with this topic as their proper understanding is important for understanding the relations and equations which model the possible real situations. The reliability phenomenon is analysed using both the exponential distribution and the Weibull distribution. The results of our analysis are specific equations giving information about the characteristics of the power plants, the mean time of operations and the probability of failure-free operation. Equations solved for the Weibull distribution respect the failures as well as the actual operating hours. Thanks to our results, we are able to create a model of dynamic reliability for prediction of future states. It can be useful for improving the current situation of the unit as well as for creating the optimal plan of maintenance and thus have an impact on the overall economics of the operation of these power plants.

  12. Risk analysis of critical infrastructures emphasizing electricity supply and interdependencies

    International Nuclear Information System (INIS)

    Kjølle, G.H.; Utne, I.B.; Gjerde, O.

    2012-01-01

    Failures in critical infrastructures can cause major damage to society. Wide-area interruptions (blackouts) in the electricity supply system have severe impacts on societal critical functions and other critical infrastructures, but there is no agreed-upon framework on how to analyze and predict the reliability of electricity supply. Thus, there is a need for an approach to cross-sector risk analyses, which facilitates risk analysis of outages in the electricity supply system and enables investigation of cascading failures and consequences in other infrastructures. This paper presents such an approach, which includes contingency analysis (power flow) and reliability analysis of power systems, as well as use of a cascade diagram for investigating interdependencies. A case study was carried out together with the Emergency Preparedness Group in the city of Oslo, Norway and the network company Hafslund Nett. The case study results highlight the need for cross-sector analyses by showing that the total estimated societal costs are substantially higher when cascading effects and consequences to other infrastructures are taken into account compared to only considering the costs of electricity interruptions as seen by the network company. The approach is a promising starting point for cross-sector risk analysis of electricity supply interruptions and consequences for dependent infrastructures.

  13. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  14. Power Industry Reliability Coordination in Asia in a Market Environment

    OpenAIRE

    Hammons, Thomas J.; Voropai, Nikolai I.

    2010-01-01

    This paper addresses the problems of power supply reliability in a market environment. The specific features of economic interrelations between the power supply organization and consumers in terms of reliability assurance are examined and the principles of providing power supply reliability are formulated. The economic mechanisms of coordinating the interests of power supply organization and consumers to provide power supply reliability are discussed. Reliability of restructuring China's powe...

  15. Problems in diagnosing and forecasting power equipment reliability

    Energy Technology Data Exchange (ETDEWEB)

    Popkov, V I; Demirchyan, K S

    1979-11-01

    This general survey deals with approaches to the resolution of such problems as the gathering, analysis and systematization of data on component defects in power equipment and setting up feedback with the manufacturing plants and planning organizations to improve equipment reliability. Such efforts on the part of designers, manufacturers and operating and repair organizations in analyzing faults in 300 MW turbogenerators during 1974-1977 reduced the specific fault rate by 20 to 25% and the downtime per failure by 35 to 40%. Since power equipment should operate for several hundreds of thousands of hours (20 to 30 years) and the majority of power components have guaranteed service lives of no more than 10/sup 5/ hours, an extremely difficult problem is the determination of the reliability of equipment past the 10/sup 5/ point. The present trend in the USSR Unified Power System towards increasing the number of shutdowns and startups, which in the case of turbogenerators of up 1200 MW power can reach 7500 to 10,000 cycles is noted. Other areas briefly treated are: MHD generator reliability and economy; nuclear power plant reliability and safety; the reliability of high-power high-voltage thyristor converters; the difficulties involved in scale modeling of power system reliability and the high cost of the requisite full-scale studies; the poor understanding of long term corrosion and erosion processes. The review concludes with arguments in favor of greater computerization of all aspects of power system management.

  16. Reliability of Power Units in Poland and the World

    OpenAIRE

    Józef Paska

    2015-01-01

    One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland), NERC (North American Electric Reliability Corporation – USA), ...

  17. FUNDAMENTALS OF RELIABILITY OF ELECTRIC POWER SYSTEM AND EQUIPMENT

    OpenAIRE

    Engr. Anumaka; Michael Chukwukadibia

    2011-01-01

    Today, the electric power system consists of complex interconnected network which are prone to different problems that militates against the reliability of the power system. Inadequate reliability in the power system causes problems such as high failure rate of power system installations and consumer equipment, transient and intransient faults, symmetrical faults etc. This paper provides an extensive review of the powers system and equipment reliability and related failure patterns in equipment.

  18. Attractive Mobile Corridors - The Power of Light Rail Infrastructures

    DEFF Research Database (Denmark)

    Olesen, Mette; Lassen, Claus

    2013-01-01

    Light rail is a popular tool in urban development strategies in many European cities. One argument for choosing a rail-based solution is that it signals stability to investors and will attract development and investments in the corridor. The choice of corridor in the various light rail cities...... and redistributes urban space. Furthermore light rail is not only a physical infrastructure but also an infrastructure of power that is carefully planned and designed creating both mental and physical patterns of mobilities and immobilities. Hence it is important to underline that mobility systems, such as light...

  19. Building infrastructure for new nuclear power programmes

    International Nuclear Information System (INIS)

    Starz, A.; Aoki, M.

    2010-01-01

    In recent years, more than sixty countries have indicated that they are considering or launching nuclear power programmes. It has been more than a decade since a country commissioned its first nuclear power plant. In meantime, the global nuclear community has faced greater concerns about safety, security and non-proliferation, resulting in increased international obligations and a greater expectation for transparency and openness regarding nuclear power programmes. Many of these 'nuclear newcomers' are turning to International Atomic Energy Agency (IAEA) to understand the implications of the nuclear power option and to receive advice about how to proceed with implementing a national programme. In response to growing demand for assistance, the IAEA developed a comprehensive, phased approach to establishing the infrastructure necessary to support a national nuclear power programme. This 'Milestones' approach is described in Nuclear Energy Series Guide NG-G-3.1 'Milestones in the Development of a National Infrastructure for Nuclear Power' (2007). From establishing the national position and legal framework to nuclear safety, security and safeguards, the Milestones covers 19 issues that need to be addressed. This approach also places special emphasis on the need for involvement of the Government, utility, industry, academic, and other stakeholders in a national decision-making process. The IAEA is also helping 'newcomers' to better understand its Safety Standards, which were written from the perspective of operating nuclear power programmes. A new safety guide is in development which provides a Road-map to the safety standards and identifies the standards that are relevant for each phase consistent with the Milestones. Several countries in the Europe region are working with the IAEA to understand the issues associated with a nuclear power programme in preparation for making a knowledgeable commitment. The starting points and approaches vary widely: some are European

  20. Reliability Issues in Stirling Radioisotope Power Systems

    Science.gov (United States)

    Schreiber, Jeffrey; Shah, Ashwin

    2005-01-01

    Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

  1. TFTR CAMAC power supplies reliability

    International Nuclear Information System (INIS)

    Camp, R.A.; Bergin, W.

    1989-01-01

    Since the expected life of the Tokamak Fusion Test Reactor (TFTR) has been extended into the early 1990's, the issues of equipment wear-out, when to refurbish/replace, and the costs associated with these decisions, must be faced. The management of the maintenance of the TFTR Central Instrumentation, Control and Data Acquisition System (CICADA) power supplies within the CAMAC network is a case study of a set of systems to monitor repairable systems reliability, costs, and results of action. The CAMAC network is composed of approximately 500 racks, each with its own power supply. By using a simple reliability estimator on a coarse time interval, in conjunction with determining the root cause of individual failures, a cost effective repair and maintenance program has been realized. This paper describes the estimator, some of the specific causes for recurring failures and their correction, and the subsequent effects on the reliability estimator. By extension of this program the authors can assess the continued viability of CAMAC power supplies into the future, predicting wear-out and developing cost effective refurbishment/replacement policies. 4 refs., 3 figs., 1 tab

  2. Reliability of Power Units in Poland and the World

    Directory of Open Access Journals (Sweden)

    Józef Paska

    2015-09-01

    Full Text Available One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland, NERC (North American Electric Reliability Corporation – USA, and WEC (World Energy Council. Deficiencies and the lack of a unified national system for collecting and processing electric power equipment unavailability data are also indicated.

  3. Reliability of the emergency ac-power system at nuclear power plants

    International Nuclear Information System (INIS)

    Battle, R.E.; Campbell, D.J.; Baranowsky, P.W.

    1982-01-01

    The reliability of the emergency ac-power systems typical of several nuclear power plants was estimated, the costs of several possible improvements was estimated. Fault trees were constructed based on a detailed design review of the emergency ac-power systems of 18 nuclear plants. The failure probabilities used in the fault trees were calculated from extensive historical data collected from Licensee Event Reports (LERs) and from operating experience information obtained from nuclear plant licensees. It was found that there are not one or two improvements that can be made at all plants to significantly increase the industry-average emergency ac-power-system reliability, but the improvements are varied and plant-specific. Estimates of the improvements in reliability and the associated cost are estimated using plant-specific designs and failure probabilities

  4. Design and implementation of a reliable and cost-effective cloud computing infrastructure: the INFN Napoli experience

    International Nuclear Information System (INIS)

    Capone, V; Esposito, R; Pardi, S; Taurino, F; Tortone, G

    2012-01-01

    Over the last few years we have seen an increasing number of services and applications needed to manage and maintain cloud computing facilities. This is particularly true for computing in high energy physics, which often requires complex configurations and distributed infrastructures. In this scenario a cost effective rationalization and consolidation strategy is the key to success in terms of scalability and reliability. In this work we describe an IaaS (Infrastructure as a Service) cloud computing system, with high availability and redundancy features, which is currently in production at INFN-Naples and ATLAS Tier-2 data centre. The main goal we intended to achieve was a simplified method to manage our computing resources and deliver reliable user services, reusing existing hardware without incurring heavy costs. A combined usage of virtualization and clustering technologies allowed us to consolidate our services on a small number of physical machines, reducing electric power costs. As a result of our efforts we developed a complete solution for data and computing centres that can be easily replicated using commodity hardware. Our architecture consists of 2 main subsystems: a clustered storage solution, built on top of disk servers running GlusterFS file system, and a virtual machines execution environment. GlusterFS is a network file system able to perform parallel writes on multiple disk servers, providing this way live replication of data. High availability is also achieved via a network configuration using redundant switches and multiple paths between hypervisor hosts and disk servers. We also developed a set of management scripts to easily perform basic system administration tasks such as automatic deployment of new virtual machines, adaptive scheduling of virtual machines on hypervisor hosts, live migration and automated restart in case of hypervisor failures.

  5. Design and implementation of a reliable and cost-effective cloud computing infrastructure: the INFN Napoli experience

    Science.gov (United States)

    Capone, V.; Esposito, R.; Pardi, S.; Taurino, F.; Tortone, G.

    2012-12-01

    Over the last few years we have seen an increasing number of services and applications needed to manage and maintain cloud computing facilities. This is particularly true for computing in high energy physics, which often requires complex configurations and distributed infrastructures. In this scenario a cost effective rationalization and consolidation strategy is the key to success in terms of scalability and reliability. In this work we describe an IaaS (Infrastructure as a Service) cloud computing system, with high availability and redundancy features, which is currently in production at INFN-Naples and ATLAS Tier-2 data centre. The main goal we intended to achieve was a simplified method to manage our computing resources and deliver reliable user services, reusing existing hardware without incurring heavy costs. A combined usage of virtualization and clustering technologies allowed us to consolidate our services on a small number of physical machines, reducing electric power costs. As a result of our efforts we developed a complete solution for data and computing centres that can be easily replicated using commodity hardware. Our architecture consists of 2 main subsystems: a clustered storage solution, built on top of disk servers running GlusterFS file system, and a virtual machines execution environment. GlusterFS is a network file system able to perform parallel writes on multiple disk servers, providing this way live replication of data. High availability is also achieved via a network configuration using redundant switches and multiple paths between hypervisor hosts and disk servers. We also developed a set of management scripts to easily perform basic system administration tasks such as automatic deployment of new virtual machines, adaptive scheduling of virtual machines on hypervisor hosts, live migration and automated restart in case of hypervisor failures.

  6. Reliability-oriented energy storage sizing in wind power systems

    DEFF Research Database (Denmark)

    Qin, Zian; Liserre, Marco; Blaabjerg, Frede

    2014-01-01

    Energy storage can be used to suppress the power fluctuations in wind power systems, and thereby reduce the thermal excursion and improve the reliability. Since the cost of the energy storage in large power application is high, it is crucial to have a better understanding of the relationship...... between the size of the energy storage and the reliability benefit it can generate. Therefore, a reliability-oriented energy storage sizing approach is proposed for the wind power systems, where the power, energy, cost and the control strategy of the energy storage are all taken into account....... With the proposed approach, the computational effort is reduced and the impact of the energy storage system on the reliability of the wind power converter can be quantified....

  7. A Reliability-Oriented Design Method for Power Electronic Converters

    DEFF Research Database (Denmark)

    Wang, Huai; Zhou, Dao; Blaabjerg, Frede

    2013-01-01

    Reliability is a crucial performance indicator of power electronic systems in terms of availability, mission accomplishment and life cycle cost. A paradigm shift in the research on reliability of power electronics is going on from simple handbook based calculations (e.g. models in MIL-HDBK-217F h...... and reliability prediction models are provided. A case study on a 2.3 MW wind power converter is discussed with emphasis on the reliability critical component IGBT modules....

  8. Improved reliability of power modules

    DEFF Research Database (Denmark)

    Baker, Nick; Liserre, Marco; Dupont, Laurent

    2014-01-01

    Power electronic systems play an increasingly important role in providing high-efficiency power conversion for adjustable-speed drives, power-quality correction, renewable-energy systems, energy-storage systems, and electric vehicles. However, they are often presented with demanding operating...... environments that challenge the reliability aspects of power electronic techniques. For example, increasingly thermally stressful environments are seen in applications such as electric vehicles, where ambient temperatures under the hood exceed 150 °C, while some wind turbine applications can place large...

  9. Reliability of emergency ac power systems at nuclear power plants

    International Nuclear Information System (INIS)

    Battle, R.E.; Campbell, D.J.

    1983-07-01

    Reliability of emergency onsite ac power systems at nuclear power plants has been questioned within the Nuclear Regulatory Commission (NRC) because of the number of diesel generator failures reported by nuclear plant licensees and the reactor core damage that could result from diesel failure during an emergency. This report contains the results of a reliability analysis of the onsite ac power system, and it uses the results of a separate analysis of offsite power systems to calculate the expected frequency of station blackout. Included is a design and operating experience review. Eighteen plants representative of typical onsite ac power systems and ten generic designs were selected to be modeled by fault trees. Operating experience data were collected from the NRC files and from nuclear plant licensee responses to a questionnaire sent out for this project

  10. Evaluation of nodal reliability risk in a deregulated power system with photovoltaic power penetration

    DEFF Research Database (Denmark)

    Zhao, Qian; Wang, Peng; Goel, Lalit

    2014-01-01

    Owing to the intermittent characteristic of solar radiation, power system reliability may be affected with high photovoltaic (PV) power penetration. To reduce large variation of PV power, additional system balancing reserve would be needed. In deregulated power systems, deployment of reserves...... and customer reliability requirements are correlated with energy and reserve prices. Therefore a new method should be developed to evaluate the impacts of PV power on customer reliability and system reserve deployment in the new environment. In this study, a method based on the pseudo-sequential Monte Carlo...... simulation technique has been proposed to evaluate the reserve deployment and customers' nodal reliability with high PV power penetration. The proposed method can effectively model the chronological aspects and stochastic characteristics of PV power and system operation with high computation efficiency...

  11. IRIS guidelines. 2014 ed. Integrated Review of Infrastructure for Safety (IRIS) for self-assessment when establishing the safety infrastructure for a nuclear power programme

    International Nuclear Information System (INIS)

    2014-01-01

    The IAEA safety standards reflect an international consensus on what constitutes a high level of safety for protecting people and the environment, and therefore represent what all Member States should achieve, whilst recognizing the ultimate responsibility of each State to ensure safety when implementing a nuclear power programme. IAEA Safety Standards Series No. SSG-16, entitled Establishing the Safety Infrastructure for a Nuclear Power Programme was published in order to provide recommendations, presented in the form of sequential actions, on meeting safety requirements progressively during the initial three phases of the development of safety, as described in INSAG-22, Nuclear Safety Infrastructure for a National Nuclear Power Programme Supported by the IAEA Fundamental Safety Principles. To that end, the 200 safety related actions, which are proposed by SSG-16, constitute a roadmap to establish a foundation for promoting a high level of safety over the entire lifetime of the nuclear power plant. These actions reflect international consensus on good practice in order to achieve full implementation of IAEA safety standards. The IAEA has developed a methodology and tool, the Integrated Review of Infrastructure for Safety (IRIS), to assist States in undertaking self-assessment with respect to SSG-16 recommendations when establishing the safety infrastructure for a nuclear power programme, and to develop an action plan for improvement. The IRIS methodology and the associated tool are fully compatible with the IAEA safety standards and are also used, when appropriate, in the preparation of review missions, such as the Integrated Regulatory Review Service and advisory missions. The present guidelines describe the IRIS methodology for self-assessment against SSG-16 recommendations. Through IRIS implementation, every organization concerned with nuclear safety may gain proper awareness and engage in a continuous progressive process to develop the effective national

  12. Small nuclear power reactor emergency electric power supply system reliability comparative analysis

    International Nuclear Information System (INIS)

    Bonfietti, Gerson

    2003-01-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  13. Industrial infrastructure for the Indian nuclear power programme

    International Nuclear Information System (INIS)

    Srinivasan, M.R.

    1986-04-01

    For the inception of the Indian nuclear power programme, great emphasis has been laid on development of comprehensive indigenous capability in design, construction and operation of nuclear power plants. The choice of the pressurised heavy water reactor as the mainline for India's first generation nuclear power stations fitted into this perspective. Apart from the inherent advantages of high neutron economy, low fuelling costs and high capacity factors, this system offered significant opportunities for manufacture and design of all the components within the country. The development of indigenous capability has not been without its problems, namely cost overruns and delays. The main causes for these delays have been the developmental nature of the jobs involving learning process and continued tightening of the quality control requirements. The strategy of development to be pursued by any country is naturally dependent upon the size of the programme it wishes to embark upon and the state of industrial infrastructure in the country. The Indian experience has demonstrated that for development of a comprehensive capability, it is necessary to have a well formulated reactor policy, a good inter-disciplinary R and D base, a good base of conventional industrial infrastructure, a comprehensive manpower development programme and an innovative management. It is hoped that this experience will be of benefit to other developing countries embarking on their own nuclear programme

  14. Reliability models for Space Station power system

    Science.gov (United States)

    Singh, C.; Patton, A. D.; Kim, Y.; Wagner, H.

    1987-01-01

    This paper presents a methodology for the reliability evaluation of Space Station power system. The two options considered are the photovoltaic system and the solar dynamic system. Reliability models for both of these options are described along with the methodology for calculating the reliability indices.

  15. High power klystrons for efficient reliable high power amplifiers

    Science.gov (United States)

    Levin, M.

    1980-11-01

    This report covers the design of reliable high efficiency, high power klystrons which may be used in both existing and proposed troposcatter radio systems. High Power (10 kW) klystron designs were generated in C-band (4.4 GHz to 5.0 GHz), S-band (2.5 GHz to 2.7 GHz), and L-band or UHF frequencies (755 MHz to 985 MHz). The tubes were designed for power supply compatibility and use with a vapor/liquid phase heat exchanger. Four (4) S-band tubes were developed in the course of this program along with two (2) matching focusing solenoids and two (2) heat exchangers. These tubes use five (5) tuners with counters which are attached to the focusing solenoids. A reliability mathematical model of the tube and heat exchanger system was also generated.

  16. Approach for an integral power transformer reliability model

    NARCIS (Netherlands)

    Schijndel, van A.; Wouters, P.A.A.F.; Steennis, E.F.; Wetzer, J.M.

    2012-01-01

    In electrical power transmission and distribution networks power transformers represent a crucial group of assets both in terms of reliability and investments. In order to safeguard the required quality at acceptable costs, decisions must be based on a reliable forecast of future behaviour. The aim

  17. Reliability analysis of grid connected small wind turbine power electronics

    International Nuclear Information System (INIS)

    Arifujjaman, Md.; Iqbal, M.T.; Quaicoe, J.E.

    2009-01-01

    Grid connection of small permanent magnet generator (PMG) based wind turbines requires a power conditioning system comprising a bridge rectifier, a dc-dc converter and a grid-tie inverter. This work presents a reliability analysis and an identification of the least reliable component of the power conditioning system of such grid connection arrangements. Reliability of the configuration is analyzed for the worst case scenario of maximum conversion losses at a particular wind speed. The analysis reveals that the reliability of the power conditioning system of such PMG based wind turbines is fairly low and it reduces to 84% of initial value within one year. The investigation is further enhanced by identifying the least reliable component within the power conditioning system and found that the inverter has the dominant effect on the system reliability, while the dc-dc converter has the least significant effect. The reliability analysis demonstrates that a permanent magnet generator based wind energy conversion system is not the best option from the point of view of power conditioning system reliability. The analysis also reveals that new research is required to determine a robust power electronics configuration for small wind turbine conversion systems.

  18. Power Electronics and Reliability in Renewable Energy Systems

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Ma, Ke; Zhou, Dao

    2012-01-01

    Power Electronics are needed in almost all kind of renewable energy systems. It is used both for controlling the renewable source and also for interfacing to the load, which can be grid-connected or working in stand-alone mode. More and more efforts are put into making renewable energy systems...... better in terms of reliability in order to ensure a high availability of the power sources, in this case the knowledge of mission profile of a certain application is crucial for the reliability evaluation/design of power electronics. In this paper an overview on the power electronic circuits behind...... the most common converter configurations for wind turbine and photovoltaic is done. Next different aspects of improving the system reliability are mapped. Further on examples of how to control the chip temperature in different power electronic configurations as well as operation modes for wind power...

  19. Grids in Europe - a computing infrastructure for science

    International Nuclear Information System (INIS)

    Kranzlmueller, D.

    2008-01-01

    Grids provide sheer unlimited computing power and access to a variety of resources to todays scientists. Moving from a research topic of computer science to a commodity tool for science and research in general, grid infrastructures are built all around the world. This talk provides an overview of the developments of grids in Europe, the status of the so-called national grid initiatives as well as the efforts towards an integrated European grid infrastructure. The latter, summarized under the title of the European Grid Initiative (EGI), promises a permanent and reliable grid infrastructure and its services in a way similar to research networks today. The talk describes the status of these efforts, the plans for the setup of this pan-European e-Infrastructure, and the benefits for the application communities. (author)

  20. Reliability study of nuclear power stations

    International Nuclear Information System (INIS)

    Nemec, J.; Sedlacek, J.

    1975-01-01

    The paper considers the physical and mathematical bases underlying nuclear power station reliability from the standpoints of material fatigue, thermal yield and ageing. The risk of failure of nuclear power station components is determined by means of the Markov stochastic process

  1. INFRASTRUCTURE

    CERN Multimedia

    A. Gaddi

    The long winter shut-down allows for modifications that will improve the reliability of the detector infrastructures at P5. The annual maintenance of detector services is taking place as well. This means a full stop of water-cooling circuits from November 24th with a gradual restart from mid January 09. The annual maintenance service includes the cleaning of the two SF5 cooling towers, service of the chiller plants on the surface, and the cryogenic plant serving the CMS Magnet. In addition, the overall site power is reduced from 8MW to 2MW, compatible with the switchover to the Swiss power network in winter. Full power will be available again from end of January. Among the modification works planned, the Low Voltage cabinets are being refurbished; doubling the cable sections and replacing the 40A circuit breakers with 60A types. This will reduce the overheating that has been experienced. Moreover, two new LV transformers will be bought and pre-cabled in order to assure a quick swap in case of failure of any...

  2. Reliability/Cost Evaluation on Power System connected with Wind Power for the Reserve Estimation

    DEFF Research Database (Denmark)

    Lee, Go-Eun; Cha, Seung-Tae; Shin, Je-Seok

    2012-01-01

    Wind power is ideally a renewable energy with no fuel cost, but has a risk to reduce reliability of the whole system because of uncertainty of the output. If the reserve of the system is increased, the reliability of the system may be improved. However, the cost would be increased. Therefore...... the reserve needs to be estimated considering the trade-off between reliability and economic aspects. This paper suggests a methodology to estimate the appropriate reserve, when wind power is connected to the power system. As a case study, when wind power is connected to power system of Korea, the effects...

  3. Generation reliability assessment in oligopoly power market using Monte Carlo simulation

    International Nuclear Information System (INIS)

    Haroonabadi, H.; Haghifam, M.R.

    2007-01-01

    This paper addressed issues regarding power generation reliability assessment (HLI) in deregulated power pool markets. Most HLI reliability evaluation methods are based on the loss of load (LOLE) approach which is among the most suitable indices to describe the level of generation reliability. LOLE refers to the time in which load is greater than the amount of available generation. While most reliability assessments deal only with power system constraints, this study considered HLI reliability assessment in an oligopoly power market using Monte Carlo simulation (MCS). It evaluated the sensitivity of the reliability index to different reserve margins and future margins. The reliability index was determined by intersecting the offer and demand curves of power plants and comparing them to other parameters. The paper described the fundamentals of an oligopoly power pool market and proposed an algorithm for HLI reliability assessment for such a market. The proposed method was assessed on the IEEE-Reliability Test System with satisfactory results. In all cases, generation reliability indices were evaluated with different reserve margins and various load levels. 19 refs., 7 figs., 1 appendix

  4. The North American power delivery system: Balancing market restructuring and environmental economics with infrastructure security

    International Nuclear Information System (INIS)

    Massoud Amin, S.; Gellings, Clark W.

    2006-01-01

    The North American electric power system was developed over the last 100 years without a conscious awareness and analysis of the system-wide implications of its current evolution under the forces of deregulation, system complexity, power-market impacts, terrorism, and human error. The possibility of power delivery beyond neighboring areas was a distant secondary consideration. Today, the North American power network may realistically be considered to be the largest machine in the world. With the advent of deregulation and competition in the electric power industry, new ways are being sought to improve the efficiency of that network without seriously diminishing its reliability and security. Controlling a heterogeneous, widely dispersed, yet globally interconnected system is a serious technological problem in any case. It is even more complex and difficult to control it for optimal efficiency and maximum benefit to the ultimate consumers while still allowing all its business components to compete fairly and freely. In this paper we present an overview of key issues and the context in which the electricity infrastructure is being operated under the above forces along with a strategic vision extending to a decade, or longer, that would enable more secure and robust systems operation, security monitoring, and efficient energy markets. (author)

  5. Evaluation of the status of national nuclear infrastructure development

    International Nuclear Information System (INIS)

    2008-01-01

    An appropriate infrastructure is essential for the safe, reliable and peaceful use of nuclear power. The IAEA was encouraged to assess ways to meet infrastructure needs and to provide guidance to Member States considering the introduction of nuclear power. All of these countries face the challenge of building the necessary nuclear infrastructure for the first nuclear power plant. The IAEA is responding to this demand through increased technical assistance, missions and workshops, and with new and updated technical publications. A holistic view of the infrastructure for nuclear power was published in Considerations to Launch a Nuclear Power Programme (GOV/INF/2007), targeted mainly at policy makers. Milestones in the Development of a National Infrastructure for Nuclear Power, an IAEA Nuclear Energy Series publication (No. NG-G-3.1) issued in 2007, provided more detailed guidance on the three phases of development outlined in Considerations to Launch a Nuclear Power Programme. It describes the sequential development through the three phases for each of 19 infrastructure issues, ranging from a government's national position on nuclear power to the procurement of items and services for the first nuclear power plant. Member States requested additional guidance on determining how to assess the progress of their infrastructure development for nuclear power programmes. This report was prepared in response to their request. It provides an evaluation approach for the status of national nuclear infrastructure development based upon the guidance presented in the Milestones publication mentioned above. The evaluation approach provides a comprehensive means to determine the status of the infrastructure conditions covering all of the 19 issues identified in the Milestones publication. This approach can be used by any interested Member State for self-evaluation in order to establish what additional work needs to be completed to develop the appropriate national infrastructure. In

  6. Reliability metrics extraction for power electronics converter stressed by thermal cycles

    DEFF Research Database (Denmark)

    Ma, Ke; Choi, Uimin; Blaabjerg, Frede

    2017-01-01

    Due to the continuous demands for highly reliable and cost-effective power conversion, the quantified reliability performances of the power electronics converter are becoming emerging needs. The existing reliability modelling approaches for the power electronics converter mainly focuses on the pr...... performance of power electronics system. The final predicted results showed good accuracy with much more reliability information compared to the existing approaches, and the quantified reliability correlation to the mission profiles of converter is mathematically established....

  7. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  8. Experiment research on cognition reliability model of nuclear power plant

    International Nuclear Information System (INIS)

    Zhao Bingquan; Fang Xiang

    1999-01-01

    The objective of the paper is to improve the reliability of operation on real nuclear power plant of operators through the simulation research to the cognition reliability of nuclear power plant operators. The research method of the paper is to make use of simulator of nuclear power plant as research platform, to take present international research model of reliability of human cognition based on three-parameter Weibull distribution for reference, to develop and get the research model of Chinese nuclear power plant operators based on two-parameter Weibull distribution. By making use of two-parameter Weibull distribution research model of cognition reliability, the experiments about the cognition reliability of nuclear power plant operators have been done. Compared with the results of other countries such USA and Hungary, the same results can be obtained, which can do good to the safety operation of nuclear power plant

  9. Reliability analysis of wind embedded power generation system for ...

    African Journals Online (AJOL)

    This paper presents a method for Reliability Analysis of wind energy embedded in power generation system for Indian scenario. This is done by evaluating the reliability index, loss of load expectation, for the power generation system with and without integration of wind energy sources in the overall electric power system.

  10. Reliability of dc power supplies in nuclear power plant application

    International Nuclear Information System (INIS)

    Eisenhut, D.G.

    1978-01-01

    In June 1977 the reliability of dc power supplies at nuclear power facilities was questioned. It was postulated that a sudden gross failure of the redundant dc power supplies might occur during normal plant operation, and that this could lead to insufficient shutdown cooling of the reactor core. It was further suggested that this potential for insufficient cooling is great enough to warrant consideration of prompt remedies. The work described herein was part of the NRC staff's efforts aimed towards putting the performance of dc power supplies in proper perspective and was mainly directed towards the particular concern raised at that time. While the staff did not attempt to perform a systematic study of overall dc power supply reliability including all possible failure modes for such supplies, the work summarized herein describes how a probabilistic approach was used to supplement our more usual deterministic approach to reactor safety. Our evaluation concluded that the likelihood of dc power supply failures leading to insufficient shutdown cooling of the reactor core is sufficiently small as to not require any immediate action

  11. Next generation information communication infrastructure and case studies for future power systems

    Science.gov (United States)

    Qiu, Bin

    As power industry enters the new century, powerful driving forces, uncertainties and new functions are compelling electric utilities to make dramatic changes in their information communication infrastructure. Expanding network services such as real time measurement and monitoring are also driving the need for more bandwidth in the communication network. These needs will grow further as new remote real-time protection and control applications become more feasible and pervasive. This dissertation addresses two main issues for the future power system information infrastructure: communication network infrastructure and associated power system applications. Optical networks no doubt will become the predominant data transmission media for next generation power system communication. The rapid development of fiber optic network technology poses new challenges in the areas of topology design, network management and real time applications. Based on advanced fiber optic technologies, an all-fiber network is investigated and proposed. The study will cover the system architecture and data exchange protocol aspects. High bandwidth, robust optical networks could provide great opportunities to the power system for better service and efficient operation. In the dissertation, different applications are investigated. One of the typical applications is the SCADA information accessing system. An Internet-based application for the substation automation system will be presented. VLSI (Very Large Scale Integration) technology is also used for one-line diagrams auto-generation. High transition rate and low latency optical network is especially suitable for power system real time control. In the dissertation, a new local area network based Load Shedding Controller (LSC) for isolated power system will be presented. By using PMU (Phasor Measurement Unit) and fiber optic network, an AGE (Area Generation Error) based accurate wide area load shedding scheme will also be proposed. The objective

  12. Short-Term and Medium-Term Reliability Evaluation for Power Systems With High Penetration of Wind Power

    DEFF Research Database (Denmark)

    Ding, Yi; Singh, Chanan; Goel, Lalit

    2014-01-01

    reliability evaluation techniques for power systems are well developed. These techniques are more focused on steady-state (time-independent) reliability evaluation and have been successfully applied in power system planning and expansion. In the operational phase, however, they may be too rough......The expanding share of the fluctuating and less predictable wind power generation can introduce complexities in power system reliability evaluation and management. This entails a need for the system operator to assess the system status more accurately for securing real-time balancing. The existing...... an approximation of the time-varying behavior of power systems with high penetration of wind power. This paper proposes a time-varying reliability assessment technique. Time-varying reliability models for wind farms, conventional generating units, and rapid start-up generating units are developed and represented...

  13. Power system reliability enhancement by using PowerformerTM

    Directory of Open Access Journals (Sweden)

    Rahmat-Allah Hooshmand

    2009-01-01

    Full Text Available A high-voltage generator PowerformerTM is a new generation of the AC generators. The most significant advantages of these PowerformerTM are their direct connection to high-voltage grid, higher availability, and more reactive power margin, short term overloading capacity and removing the power transformer from the structure of the power plant. In this paper, the installation effect of these generators on the power system reliability is investigated. The amount of the effects depends on the type and location of the power plant, location of the PowerformerTM, the size of load and network topology. For this purpose, in the 6-bus IEEE RBTS system, the conventional generators are replaced by these new PowerformerTM and then, the reliability indices are evaluated. The simulation results show that the reliability indices such as the expected duration of load curtailment (EDLC and the expected energy not served (EENS are improved. .

  14. Reliability technology and nuclear power

    International Nuclear Information System (INIS)

    Garrick, B.J.; Kaplan, S.

    1976-01-01

    This paper reviews some of the history and status of nuclear reliability and the evolution of this subject from art towards science. It shows that that probability theory is the appropriate and essential mathematical language of this subject. The authors emphasize that it is more useful to view probability not as a $prime$frequency$prime$, i.e., not as the result of a statistical experiment, but rather as a measure of state of confidence or a state of knowledge. They also show that the probabilistic, quantitative approach has a considerable history of application in the electric power industry in the area of power system planning. Finally, the authors show that the decision theory notion of utility provides a point of view from which risks, benefits, safety, and reliability can be viewed in a unified way thus facilitating understanding, comparison, and communication. 29 refs

  15. Power system reliability memento; Memento de la surete du systeme electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The reliability memento of the French power system (national power transmission grid) is an educational document which purpose is to point out the role of each one as regards power system operating reliability. This memento was first published in 1999. Extensive changes have taken place since then. The new 2002 edition shows that system operating reliability is as an important subject as ever: 1 - foreword; 2 - system reliability: the basics; 3 - equipment measures taken in order to guarantee the reliability of the system; 4 - organisational and human measures taken to guarantee the reliability of the system; appendix 1 - system operation: basic concepts; appendix 2 - guiding principles governing the reliability of the power system; appendix 3 - international associations of transmission system operators; appendix 4 - description of major incidents.

  16. Critical infrastructure protection

    Energy Technology Data Exchange (ETDEWEB)

    Bradley, F. [Canadian Electricity Association, Toronto, ON (Canada)

    2003-04-01

    The need to protect critical electrical infrastructure from terrorist attacks, or other physical damage, including weather related events, or the potential impact of computer viruses and other attacks on IT resources are discussed. Activities of the North American Electric Reliability Council (NERC) are highlighted which seek to safeguard the North American bulk electric power system principally through the Information Sharing and Analysis Sector (ES-ISAC). ES-ISAC serves the electricity sector by facilitating communication between electric sector participants, federal government and other critical infrastructure industries by disseminating threat indications, analyses and warnings, together with interpretations, to assist the industry in taking infrastructure protection actions. Attention is drawn to the numerous cyber incidents in recent years, which although resulted in no loss of service to electricity customers so far, in at least one instance (the January 25th SOL-Slammer worm incident) resulted in degradation of service in a number of sectors, including financial, transportation and telecommunication services. The increasing frequency of cyber-based attacks, coupled with the industry's growing dependence on e-commerce and electronic controls, are good reasons to believe that critical infrastructure protection (CIP) poses a serious challenge to the industry's risk management practices. The Canadian Electricity Association (CEA) is an active participant in ES-ISAC and works cooperatively with a range of partners, such as the Edison Electric Institute and the American Public Power Association to ensure coordination and effective protection program delivery for the electric power sector. The Early Warning System (EWS) developed by the CIP Working Group is one of the results of this cooperation. EWS uses the Internet, e-mail, web-enabled cell phones and Blackberry hand-held devices to deliver real-time threat information to members on a 24/7 basis. EWS

  17. Reliability of PWR type nuclear power plants

    International Nuclear Information System (INIS)

    Ribeiro, A.A.T.; Muniz, A.A.

    1978-12-01

    Results of the analysis of factors influencing the reliability of international nuclear power plants of the PWR type are presented. The reliability factor is estimated and the probability of its having lower values than a certain specified value is discussed. (Author) [pt

  18. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1981-01-01

    This lecture presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis, outlines the main reasons for the reliable performance of Swiss nuclear power plants and explains the management function as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability. (orig./RW)

  19. Basic research on human reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Zhang Li; Deng Zhiliang

    1996-10-01

    Human reliability in nuclear power plants is one of key factors in nuclear safety and economic operation. According to cognitive science, behaviour theory and ergonomic and on the bases of human cognitive behaviour characteristics, performance shaping factors, human error mechanisms and organization management, the project systematically studied the human reliability in nuclear power plant systems, established the basic theory and methods for analyzing human factor accidents and suggested feasible approaches and countermeasures for precaution against human factor accidents and improving human reliability. The achievement has been applied in operation departments, management departments and scientific research institutions of nuclear power, and has produced guiding significance and practical value to design, operation and management in nuclear power plants. (11 refs.)

  20. Reliability research to nuclear power plant operators based on several methods

    International Nuclear Information System (INIS)

    Fang Xiang; Li Fu; Zhao Bingquan

    2009-01-01

    The paper utilizes many kinds of international reliability research methods, and summarizes the review of reliability research of Chinese nuclear power plant operators in past over ten years based on the simulator platform of nuclear power plant. The paper shows the necessity and feasibility of the research to nuclear power plant operators from many angles including human cognition reliability, fuzzy mathematics model and psychological research model, etc. It will be good to the safe operation of nuclear power plant based on many kinds of research methods to the reliability research of nuclear power plant operators. (authors)

  1. A Statistical Approach to Planning Reserved Electric Power for Railway Infrastructure Administration

    OpenAIRE

    Brabec, M. (Marek); Pelikán, E. (Emil); Konár, O. (Ondřej); Kasanický, I. (Ivan); Juruš, P. (Pavel); Sadil, J.; Blažek, P.

    2013-01-01

    One of the requirements on railway infrastructure administration is to provide electricity for day-to-day operation of railways. We propose a statistically based approach for the estimation of maximum 15-minute power within a calendar month for a given region. This quantity serves as a basis of contracts between railway infrastructure administration and electricity distribution system operator. We show that optimization of the prediction is possible, based on underlying loss function deriv...

  2. Maximal network reliability for a stochastic power transmission network

    International Nuclear Information System (INIS)

    Lin, Yi-Kuei; Yeh, Cheng-Ta

    2011-01-01

    Many studies regarded a power transmission network as a binary-state network and constructed it with several arcs and vertices to evaluate network reliability. In practice, the power transmission network should be stochastic because each arc (transmission line) combined with several physical lines is multistate. Network reliability is the probability that the network can transmit d units of electric power from a power plant (source) to a high voltage substation at a specific area (sink). This study focuses on searching for the optimal transmission line assignment to the power transmission network such that network reliability is maximized. A genetic algorithm based method integrating the minimal paths and the Recursive Sum of Disjoint Products is developed to solve this assignment problem. A real power transmission network is adopted to demonstrate the computational efficiency of the proposed method while comparing with the random solution generation approach.

  3. Electric power infrastructure in Asia and the Pacific: economics and investment opportunity

    International Nuclear Information System (INIS)

    Sudarsono, B.S.; Saha, P.C.

    1995-01-01

    The purpose of this paper is to discuss the status and potential of the Asia Pacific electric power infrastructure, including the transmission and distribution system, to highlight some of the most relevant issues in the sector and to look at the prospect of investment opportunity for the private sector in the power industry

  4. Reliability evaluation of deregulated electric power systems for planning applications

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A.M.; Jafari, A.; Fotuhi-Firuzabad, M.

    2008-01-01

    In a deregulated electric power utility industry in which a competitive electricity market can influence system reliability, market risks cannot be ignored. This paper (1) proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets and (2) develops a methodology for incorporating the market reliability problem into HLII reliability studies. A Markov state space diagram is employed to evaluate the market reliability. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. The key point in the proposed method is the concept that the reliability level of a restructured electric power system can be calculated using the availability of the composite power system (HLII) and the reliability of the electricity market. Two case studies are carried out over Roy Billinton Test System (RBTS) to illustrate interesting features of the proposed methodology

  5. Approach to developing reliable space reactor power systems

    International Nuclear Information System (INIS)

    Mondt, J.F.; Shinbrot, C.H.

    1991-01-01

    The Space Reactor Power System Project is in the engineering development phase of a three-phase program. During Phase II, the Engineering Development Phase, the SP-100 Project has defined and is pursuing a new approach to developing reliable power systems. The approach to developing such a system during the early technology phase is described in this paper along with some preliminary examples to help explain the approach. Developing reliable components to meet space reactor power system requirements is based on a top down systems approach which includes a point design based on a detailed technical specification of a 100 kW power system

  6. Reliability modeling and analysis of smart power systems

    CERN Document Server

    Karki, Rajesh; Verma, Ajit Kumar

    2014-01-01

    The volume presents the research work in understanding, modeling and quantifying the risks associated with different ways of implementing smart grid technology in power systems in order to plan and operate a modern power system with an acceptable level of reliability. Power systems throughout the world are undergoing significant changes creating new challenges to system planning and operation in order to provide reliable and efficient use of electrical energy. The appropriate use of smart grid technology is an important drive in mitigating these problems and requires considerable research acti

  7. Coarse-Grained Online Monitoring of BTI Aging by Reusing Power-Gating Infrastructure

    OpenAIRE

    Tenentes, V.; Rossi, D.; Sheng Yang,; Khursheed, S.; Al-Hashimi, B.M.; Gunn, S.R.

    2017-01-01

    In this paper, we present a novel coarse-grained technique for monitoring online the Bias Temperature Instability (BTI) aging of circuits by exploiting their power gating infrastructure. The proposed technique relies on monitoring the discharge time of the virtual-power-network during stand-by operations, the value of which depends on the threshold voltage of the CMOS devices in the power-gated design (PGD). It does not require any distributed sensors, because the virtual-power network is alr...

  8. Transitioning to Physics-of-Failure as a Reliability Driver in Power Electronics

    DEFF Research Database (Denmark)

    Wang, Huai; Liserre, Marco; Blaabjerg, Frede

    2014-01-01

    Power electronics has progressively gained important status in power generation, distribution and consumption. With more than 70% of electricity processed through power electronics, recent research endeavors to improve the reliability of power electronic systems to comply with more stringent...... constraints on cost, safety and availability in various applications. This paper serves to give an overview of the major aspects of reliability in power electronics and to address the future trends in this multidisciplinary research direction. The ongoing paradigm shift in reliability research is presented...... first. Then the three major aspects of power electronics reliability are discussed, respectively, which cover from physics-of-failure analysis of critical power elec-tronic components, state-of-the-art design for reliability process and robustness validation, and intelligent control and condition...

  9. Design for Reliability of Power Electronic Systems

    DEFF Research Database (Denmark)

    Yang, Yongheng; Wang, Huai; Sangwongwanich, Ariya

    2018-01-01

    Power density, efficiency, cost, and reliability are the major challenges when designing a power electronic system. Latest advancements in power semiconductor devices (e.g., silicon carbide devices) and topological innovations have vital contributions to power density and efficiency. Nevertheless......, dedicated heat sink systems for thermal management are required to dissipate the power losses in power electronic systems; otherwise, the power devices will be heated up and eventually fail to operate. In addition, in many mission critical applications (e.g., marine systems), the operating condition (i...

  10. An integrated reliability management system for nuclear power plants

    International Nuclear Information System (INIS)

    Kimura, T.; Shimokawa, H.; Matsushima, H.

    1998-01-01

    The responsibility in the nuclear field of the Government, utilities and manufactures has increased in the past years due to the need of stable operation and great reliability of nuclear power plants. The need to improve the reliability is not only for the new plants but also for those now running. So, several measures have been taken to improve reliability. In particular, the plant manufactures have developed a reliability management system for each phase (planning, construction, maintenance and operation) and these have been integrated as a unified system. This integrated reliability management system for nuclear power plants contains information about plant performance, failures and incidents which have occurred in the plants. (author)

  11. Nuclear power plant reliability database management

    International Nuclear Information System (INIS)

    Meslin, Th.; Aufort, P.

    1996-04-01

    In the framework of the development of a probabilistic safety project on site (notion of living PSA), Saint Laurent des Eaux NPP implements a specific EDF reliability database. The main goals of this project at Saint Laurent des Eaux are: to expand risk analysis and to constitute an effective local basis of thinking about operating safety by requiring the participation of all departments of a power plant: analysis of all potential operating transients, unavailability consequences... that means to go further than a simple culture of applying operating rules; to involve nuclear power plant operators in experience feedback and its analysis, especially by following up behaviour of components and of safety functions; to allow plant safety managers to outline their decisions facing safety authorities for notwithstanding, preventive maintenance programme, operating incident evaluation. To hit these goals requires feedback data, tools, techniques and development of skills. The first step is to obtain specific reliability data on the site. Raw data come from plant maintenance management system which processes all maintenance activities and keeps in memory all the records of component failures and maintenance activities. Plant specific reliability data are estimated with a Bayesian model which combines these validated raw data with corporate generic data. This approach allow to provide reliability data for main components modelled in PSA, to check the consistency of the maintenance program (RCM), to verify hypothesis made at the design about component reliability. A number of studies, related to components reliability as well as decision making process of specific incident risk evaluation have been carried out. This paper provides also an overview of the process management set up on site from raw database to specific reliability database in compliance with established corporate objectives. (authors). 4 figs

  12. Nuclear power plant reliability database management

    Energy Technology Data Exchange (ETDEWEB)

    Meslin, Th [Electricite de France (EDF), 41 - Saint-Laurent-des-Eaux (France); Aufort, P

    1996-04-01

    In the framework of the development of a probabilistic safety project on site (notion of living PSA), Saint Laurent des Eaux NPP implements a specific EDF reliability database. The main goals of this project at Saint Laurent des Eaux are: to expand risk analysis and to constitute an effective local basis of thinking about operating safety by requiring the participation of all departments of a power plant: analysis of all potential operating transients, unavailability consequences... that means to go further than a simple culture of applying operating rules; to involve nuclear power plant operators in experience feedback and its analysis, especially by following up behaviour of components and of safety functions; to allow plant safety managers to outline their decisions facing safety authorities for notwithstanding, preventive maintenance programme, operating incident evaluation. To hit these goals requires feedback data, tools, techniques and development of skills. The first step is to obtain specific reliability data on the site. Raw data come from plant maintenance management system which processes all maintenance activities and keeps in memory all the records of component failures and maintenance activities. Plant specific reliability data are estimated with a Bayesian model which combines these validated raw data with corporate generic data. This approach allow to provide reliability data for main components modelled in PSA, to check the consistency of the maintenance program (RCM), to verify hypothesis made at the design about component reliability. A number of studies, related to components reliability as well as decision making process of specific incident risk evaluation have been carried out. This paper provides also an overview of the process management set up on site from raw database to specific reliability database in compliance with established corporate objectives. (authors). 4 figs.

  13. Bulk electric system reliability evaluation incorporating wind power and demand side management

    Science.gov (United States)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed

  14. Structural reliability of atomic power plant

    International Nuclear Information System (INIS)

    Klemin, A.I.; Polyakov, E.F.

    1980-01-01

    In 1978 the first specialized technical manual ''Technique of Calculating the Structural Reliability of an Atomic Power Plant and Its Systems in the Design Stage'' was developed. The present article contains information about the main characteristics and capabilities of the manual. The manual gives recommendations concerning the calculations of the reliability of such specific systems as the reactor control and safety system, the system of instrumentation and automatic control, and safety systems. 2 refs

  15. INFRASTRUCTURE

    CERN Multimedia

    Andrea Gaddi

    With all the technical services running, the attention has moved toward the next shutdown that will be spent to perform those modifications needed to enhance the reliability of CMS Infrastructures. Just to give an example for the cooling circuit, a set of re-circulating bypasses will be installed into the TS/CV area to limit the pressure surge when a circuit is partially shut-off. This problem has affected especially the Endcap Muon cooling circuit in the past. Also the ventilation of the UXC55 has to be revisited, allowing the automatic switching to full extraction in case of magnet quench. (Normally 90% of the cavern air is re-circulated by the ventilation system.) Minor modifications will concern the gas distribution, while the DSS action-matrix has to be refined according to the experience gained with operating the detector for a while. On the powering side, some LV power lines have been doubled and the final schematics of the UPS coverage for the counting rooms have been released. The most relevant inte...

  16. Environmental determinants of unscheduled residential outages in the electrical power distribution of Phoenix, Arizona

    International Nuclear Information System (INIS)

    Maliszewski, Paul J.; Larson, Elisabeth K.; Perrings, Charles

    2012-01-01

    The sustainability of power infrastructures depends on their reliability. One test of the reliability of an infrastructure is its ability to function reliably in extreme environmental conditions. Effective planning for reliable electrical systems requires knowledge of unscheduled outage sources, including environmental and social factors. Despite many studies on the vulnerability of infrastructure systems, the effect of interacting environmental and infrastructural conditions on the reliability of urban residential power distribution remains an understudied problem. We model electric interruptions using outage data between the years of 2002 and 2005 across Phoenix, Arizona. Consistent with perceptions of increased exposure, overhead power lines positively correlate with unscheduled outages indicating underground cables are more resistant to failure. In the presence of overhead lines, the interaction between birds and vegetation as well as proximity to nearest desert areas and lakes are positive driving factors explaining much of the variation in unscheduled outages. Closeness to the nearest arterial road and the interaction between housing square footage and temperature are also significantly positive. A spatial error model was found to provide the best fit to the data. Resultant findings are useful for understanding and improving electrical infrastructure reliability. - Highlights: ► Unscheduled outages were related to interacting environmental and infrastructural conditions. ► Underground feeders are more resistant to failure. ► In the presence of overhead lines, birds, vegetation, and proximity to desert areas are positive driving factors. ► Proximity to arterial roads and a proxy for energy demand were significantly positive. ► Outages were most spatially dependent up to around 350 m.

  17. Infrastructure for thulium-170 isotope power systems for autonomous underwater vehicle fleets

    International Nuclear Information System (INIS)

    Walter, C.E.

    1991-07-01

    The radioisotope thulium-170 is a safe and environmentally benign heat source for providing the high endurance and energy densities needed by advanced power systems for autonomous underwater vehicles (AUV). Thulium Isotope Power (TIP) systems have an endurance of ∼3000 h, and gravimetric and volumetric energy densities of 3 x 10 4 Wh/kg and 3 x 10 8 Wh/m 3 , respectively. These energy densities are more than 200 times higher than those currently provided by Ag-Zn battery technology. In order to capitalize on these performance levels with about one hundred AUVs in continuous use, it will be necessary to establish an infrastructure for isotope production and heat-source refurbishment. The infrastructure cost is not trivial, and studies are needed to determine its optimum configuration. The major component of the projected infrastructure is the nuclear reactor used to produce Tm- 170 by neutron absorption in Tm-169. The reactor design should ideally be optimized for TM-170 production. Using the byproduct ''waste'' heat beneficially would help defray the cost of isotope production. However, generating electric power with the reactor would compromise both the cost of electricity and the isotope production capacity. A coastal location for the reactor would be most convenient from end-use considerations, and the ''waste'' heat could be used to desalinate seawater in water-thirsty states. 13 refs., 6 figs., 2 tabs

  18. Reliability of fossil-fuel and nuclear power installations

    International Nuclear Information System (INIS)

    1983-01-01

    The conference heard a total of 37 papers of which 24 were inputted in INIS. The subject area was mainly the use of reliability information systems and the production of data banks for these systems, the application of the reliability theory and the reliability analysis of equipment and systems of nuclear power plants. (J.P.)

  19. Reliability of power electronic converter systems

    CERN Document Server

    Chung, Henry Shu-hung; Blaabjerg, Frede; Pecht, Michael

    2016-01-01

    This book outlines current research into the scientific modeling, experimentation, and remedial measures for advancing the reliability, availability, system robustness, and maintainability of Power Electronic Converter Systems (PECS) at different levels of complexity.

  20. Improvement of standards on functional reliability of electric power systems

    International Nuclear Information System (INIS)

    Barinov, V.A.; Volkov, G.A.; Kalita, V.V.; Kogan, F.L.; Makarov, S.F.; Manevich, A.S.; Mogirev, V.V.; Sin'chugov, F.I.; Skopintsev, V.A.; Khvoshchinskaya, Z.G.

    1993-01-01

    Analysis of the most principal aspects of the existing standards and requirements on assuring safety and stability of electric power systems (EPS) and effective (reliable and economical) power supply of consumers is given. The reliability is determined as ability to accomplish the assigned functions. Basic recommendations on improving the standards regulating the safety and reliability of the NPP functioning are formulated

  1. power system reliability in supplying nuclear reactors

    International Nuclear Information System (INIS)

    Gad, M.M.M.

    2007-01-01

    this thesis presents a simple technique for deducing minimal cut set (MCS) from the defined minimal path set (MPS) of generic distribution system and this technique have been used to evaluate the basic reliability indices of Egypt's second research reactor (ETRR-2) electrical distribution network. the alternative system configurations are then studied to evaluate their impact on service reliability. the proposed MCS approach considers both sustained and temporary outage. the temporary outage constitutes an important parameter in characterizing the system reliability indices for critical load point in distribution system. it is also consider the power quality impact on the reliability indices

  2. Systems and methods for tracking a device in zero-infrastructure and zero-power conditions, and a tracking device therefor

    KAUST Repository

    Shamim, Atif

    2017-03-23

    Disclosed are embodiments for a tracking device having multiple layers of localization and communication capabilities, and particularly having the ability to operate in zero-infrastructure or zero-power conditions. Also disclosed are methods and systems that enhance location determination in zero-infrastructure and zero-power conditions. In one example, a device, system and/or method includes an infrastructure-based localization module, an infrastructure-less localization module and a passive module that can utilize at least two of the modules to determine a location of the tracking device.

  3. Optimization of Reliability and Power Consumption in Systems on a Chip

    OpenAIRE

    Simunic, Tajana; Mihic, Kresimir; De Micheli, Giovanni

    2005-01-01

    Aggressive transistor scaling, decreased voltage margins and increased processor power and temperature, have made reliability assessment a much more significant issue in design. Although reliability of devices and interconnect has been broadly studied, here we characterize reliability at the system level. Thus we consider component-based System on Chip designs. Reliability is strongly affected by system temperature, which is in turn driven by power consumption. Thus, component reliability and...

  4. Structural Reliability Methods for Wind Power Converter System Component Reliability Assessment

    DEFF Research Database (Denmark)

    Kostandyan, Erik; Sørensen, John Dalsgaard

    2012-01-01

    Wind power converter systems are essential subsystems in both off-shore and on-shore wind turbines. It is the main interface between generator and grid connection. This system is affected by numerous stresses where the main contributors might be defined as vibration and temperature loadings....... The temperature variations induce time-varying stresses and thereby fatigue loads. A probabilistic model is used to model fatigue failure for an electrical component in the power converter system. This model is based on a linear damage accumulation and physics of failure approaches, where a failure criterion...... is defined by the threshold model. The attention is focused on crack propagation in solder joints of electrical components due to the temperature loadings. Structural Reliability approaches are used to incorporate model, physical and statistical uncertainties. Reliability estimation by means of structural...

  5. Reliability Evaluation of Power Capacitors in a Wind Turbine System

    DEFF Research Database (Denmark)

    Zhou, Dao; Blaabjerg, Frede

    2018-01-01

    With the increasing penetration of wind power, reliable and cost-effective wind energy production is of more and more importance. The doubly-fed induction generator based partial-scale wind power converter is still dominating in the existing wind farms. In this paper, the reliability assessment...... block diagram is used to bridge the gap between the Weibull distribution based component-level individual capacitor and the capacitor bank. A case study of a 2 MW wind power converter shows that the lifetime is significantly reduced from the individual capacitor to the capacitor bank. Besides, the dc...... of power capacitors is studied considering the annual mission profile. According to an electro-thermal stress evaluation, the time-to-failure distribution of both the dc-link capacitor and ac-side filter capacitor is detailed investigated. Aiming for the systemlevel reliability analysis, a reliability...

  6. Assessment of infrastructure development requirements for embarking on nuclear power program in Macedonia

    International Nuclear Information System (INIS)

    Popov, N.; Ilijovski, I.; Popovski, V.

    2015-01-01

    Over the past decades nuclear energy has been proven as reliable and economical energy supply that is capable of meeting demanding energy market requirements. Many countries around the world consider entering into new nuclear energy programs and building new power reactors for satisfying their increasing electrical energy needs. A nuclear power program is a major undertaking requiring careful planning, preparation and investment, and human resources for building adequate nuclear infrastructure. Preparations for making a decision to enter into a new nuclear energy program requires a significant amount of financial and human resources, time, and assistance from already developed countries and international nuclear organizations. The International Atomic Energy Agency (IAEA) from Vienna provides technical help, financial assistance, and documented knowledge that are important for countries facing the challenge of entering nuclear programs for the first time. The IAEA organizes technical courses and information exchange meetings for new countries at which experiences and lessons learned are provided to new countries. This paper describes the key activities in the process for making a decision to enter a new nuclear energy program. It describes the efforts currently being conducted in the Republic of Macedonia in the direction of collecting information, performing various feasibility studies, and engaging in regional cooperation for utilizing experiences of the regional countries in performing such activities, and in developing their nuclear power programs. This paper also provides an overview of the IAEA documents and recommendations that are relevant for this topic

  7. Testing Situation Awareness Network for the Electrical Power Infrastructure

    Directory of Open Access Journals (Sweden)

    Rafał Leszczyna

    2016-09-01

    Full Text Available The contemporary electrical power infrastructure is exposed to new types of threats. The cause of such threats is related to the large number of new vulnerabilities and architectural weaknesses introduced by the extensive use of Information and communication Technologies (ICT in such complex critical systems. The power grid interconnection with the Internet exposes the grid to new types of attacks, such as Advanced Persistent Threats (APT or Distributed-Denial-ofService (DDoS attacks. When addressing this situation the usual cyber security technologies are prerequisite, but not sufficient. To counter evolved and highly sophisticated threats such as the APT or DDoS, state-of-the-art technologies including Security Incident and Event Management (SIEM systems, extended Intrusion Detection/Prevention Systems (IDS/IPS and Trusted Platform Modules (TPM are required. Developing and deploying extensive ICT infrastructure that supports wide situational awareness and allows precise command and control is also necessary. In this paper the results of testing the Situational Awareness Network (SAN designed for the energy sector are presented. The purpose of the tests was to validate the selection of SAN components and check their operational capability in a complex test environment. During the tests’ execution appropriate interaction between the components was verified.

  8. ASCERTAINMENT OF ELECTRIC-SUPPLY SCHEMES RELIABILITY FOR THE ATOMIC POWER PLANT AUXILIARIES

    Directory of Open Access Journals (Sweden)

    A. L. Starzhinskij

    2015-01-01

    Full Text Available The paper completes ascertainment of electrical-supply scheme reliability for the auxiliaries of a nuclear power plant. Thereat the author considers the system behavior during the block normal operation, carrying out current maintenance, and capital repairs in combination with initiating events. The initiating events for reactors include complete blackout, i.e. the loss of outside power supply (normal and reserve; emergency switching one of the working turbogenerators; momentary dumping the normal rating to the level of auxiliaries with seating the cutout valve of one turbo-generator. The combination of any initiating event with the repairing mode in case of one of the system elements failure should not lead to blackout occurrence of more than one system of the reliable power supply. This requirement rests content with the help of the reliable power supply system self-dependence (electrical and functional and the emergency power-supply operational autonomy (diesel generator and accumulator batteries.The reliability indicators of the power supply system for the nuclear power plant auxiliaries are the conditional probabilities of conjoined blackout of one, two, and three sections of the reliable power supply conditional upon an initiating event emerging and the blackout of one, two, and three reliable power-supply sections under the normal operational mode. Furthermore, they also are the blackout periodicity of one and conjointly two, three, and four sections of normal operation under the block normal operational mode. It is established that the blackout of one bus section of normal operation and one section of reliable power-supply system of the auxiliaries that does not lead to complete blackout of the plant auxiliaries may occur once in three years. The probability of simultaneous power failure of two or three normal-operation sections and of two reliable power-supply sections during the power plant service life is unlikely.

  9. INFRASTRUCTURE

    CERN Document Server

    A.Gaddi

    2011-01-01

    Between the end of March to June 2011, there has been no detector downtime during proton fills due to CMS Infrastructures failures. This exceptional performance is a clear sign of the high quality work done by the CMS Infrastructures unit and its supporting teams. Powering infrastructure At the end of March, the EN/EL group observed a problem with the CMS 48 V system. The problem was a lack of isolation between the negative (return) terminal and earth. Although at that moment we were not seeing any loss of functionality, in the long term it would have led to severe disruption to the CMS power system. The 48 V system is critical to the operation of CMS: in addition to feeding the anti-panic lights, essential for the safety of the underground areas, it powers all the PLCs (Twidos) that control AC power to the racks and front-end electronics of CMS. A failure of the 48 V system would bring down the whole detector and lead to evacuation of the cavern. EN/EL technicians have made an accurate search of the fault, ...

  10. Reliability evaluation of emergency AC power systems based on operating experience at U.S. nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Baranowsky, P. W. [U.S. Nuclear Regulatory Commission, Washington, DC (United States)

    1986-02-15

    The reliability of emergency AC power Systems has been under study at the U.S. Nuclear Regulatory Commission and by its contractors for several years. This paper provides the results of work recently performed to evaluate past U.S. nuclear power plant emergency AC power System reliability performance using system level data. Operating experience involving multiple diesel generator failures, unavailabilities, and simultaneous occurrences of failures and out of service diesel generators were used to evaluate reliability performance at individual nuclear power plants covering a 9 year period from 1976 through 1984. The number and nature of failures and distributions of reliability evaluation results are provided. The results show that plant specific performance varied considerably during the period with a large number achieving high reliability performance and a smaller number accounting for lower levels of reliability performance. (author)

  11. A physical review on power system reliability factors

    International Nuclear Information System (INIS)

    Navid, Taghizadegan; Ahmad Reza, Zentabchi; Mohammad Ali, Tavakoli; Nader, Samsunchi; Mohammad Ali, Tavakoli

    2005-01-01

    Full text : Planning and design engineers and management must necessarily take into consideration the funds available, the requirements of regulatory agencies and other restrictions that may be imposed, as well as availability of equipment and supplies. A well-designed electrical power system strikes a reasonable between reliability and cost. A prime responsibility of power system operators is to operate their systems in such a way that will provide the maximum reliability of service possible with the facilities under their control

  12. Research on reliability management systems for Nuclear Power Plant

    International Nuclear Information System (INIS)

    Maki, Nobuo

    2000-01-01

    Investigation on a reliability management system for Nuclear Power Plants (NPPs) has been performed on national and international archived documents as well as on current status of studies at Idaho National Engineering and Environmental Laboratory (INEEL), US NPPs (McGuire, Seabrook), a French NPP (St. Laurent-des-Eaux), Japan Atomic Energy Research Institute (JAERI), Central Research Institute of Electric Power Industries (CRIEPI), and power plant manufacturers in Japan. As a result of the investigation, the following points were identified: (i) A reliability management system is composed of a maintenance management system to inclusively manage maintenance data, and an anomalies information and reliability data management system to extract data from maintenance results stored in the maintenance management system and construct a reliability database. (ii) The maintenance management system, which is widely-used among NPPs in the US and Europe, is an indispensable system for the increase of maintenance reliability. (iii) Maintenance management methods utilizing reliability data like Reliability Centered Maintenance are applied for NPP maintenance in the US and Europe, and contributing to cost saving. Maintenance templates are effective in the application process. In addition, the following points were proposed on the design of the system: (i) A detailed database on specifications of facilities and components is necessary for the effective use of the system. (ii) A demand database is indispensable for the application of the methods. (iii) Full-time database managers are important to maintain the quality of the reliability data. (author)

  13. Increasing reliability of nuclear energy equipment and at nuclear power plants

    International Nuclear Information System (INIS)

    Ochrana, L.

    1997-01-01

    The Institute of Nuclear Energy at the Technical University in Brno cooperates with nuclear power plants in increasing their reliability. The teaching programme is briefly described. The scientific research programme of the Department of Heat and Nuclear Power Energy Equipment in the field of reliability is based on a complex systematic concept securing a high level of reliability. In 1996 the Department prepared a study dealing with the evaluation of the maintenance system in a nuclear power plant. The proposed techniques make it possible to evaluate the reliability and maintenance characteristics of any individual component in a nuclear power plant, and to monitor, record and evaluate data at any given time intervals. (M.D.)

  14. thermal power stations' reliability evaluation in a hydrothermal system

    African Journals Online (AJOL)

    Dr Obe

    A quantitative tool for the evaluation of thermal power stations reliability in a hydrothermal system is presented. ... (solar power); wind (wind power) and the rest, thermal power and ... probability of a system performing its function adequately for ...

  15. Developing industrial infrastructures to support a programme of nuclear power

    International Nuclear Information System (INIS)

    1988-01-01

    This Guidebook is intended to offer assistance in the many considerations and decisions involved in preparing the national industry for participation in a nuclear power programme. The heavy financial investment, the setting up of certain infrastructures many years ahead of plant construction, plus the high level of technology involved require early and systematic planning. A further purpose of this Guidebook is to serve particularly those decision makers and planners in the various governmental authorities, the technological institutions and in the industries likely to be involved in a nuclear project. These industries include the services of the national engineering resources, the domestic design and manufacturing groups as well as the civil construction companies. These will be responsible for plant erection, testing and commissioning and most of all for the establishment of a framework for quality assurance. All of these are the components of an essential infrastructure necessary to raise the standards of the national industry and to displace increasingly foreign suppliers to the extent possible. In addition, this Guidebook should help to show some of the implications, consequences and options involved in a nuclear power programme. It does not consider the basic decisions for going nuclear, nor does it review the choice of the technology or nuclear process selected for the programme. Instead, it limits itself to a consideration of the nuclear power plant and its essential cycle activities. Figs and tabs

  16. Interpreting transnational infrastructure vulnerability: European blackout and the historical dynamics of transnational electricity governance

    International Nuclear Information System (INIS)

    Vleuten, Erik van der; Lagendijk, Vincent

    2010-01-01

    Recent transnational blackouts exposed two radically opposed interpretations of Europe's electricity infrastructure, which inform recent and ongoing negotiations on transnational electricity governance. To EU policy makers such blackouts revealed the fragility of Europe's power grids and the need of a more centralized form of governance, thus legitimizing recent EU interventions. Yet to power sector spokespersons, these events confirmed the reliability of transnational power grids and the traditional decentralized governance model: the disturbances were quickly contained and repaired. This paper inquires the historic legacies at work in these conflicting interpretations and associated transnational governance preferences. It traces the power sector's interpretation to its building of a secure transnational power grid from the 1950s through the era of neoliberalization. Next it places the EU interpretation and associated policy measures against the historical record of EU attempts at transnational infrastructure governance. Uncovering the historical roots and embedding of both interpretations, we conclude that their divergence is of a surprisingly recent date and relates to the current era of security thinking. Finally we recommend transnational, interpretative, and historical analysis to the field of critical infrastructure studies.

  17. Developing Infrastructure for New Nuclear Power Programmes

    International Nuclear Information System (INIS)

    2011-09-01

    Many countries are interested in introducing or expanding nuclear energy programmes because they regard nuclear power as a clean and stable source of electricity that can help to mitigate the impact of climate change. However, the March 2011 accident at the Fukushima Daiichi nuclear power plant in Japan - caused by an earthquake and tsunami of unprecedented proportions - demonstrated that there is a constant need to improve global nuclear safety, despite the great progress made in the previous 25 years. A 'safety first' approach needs to become fully entrenched among nuclear power plant operators, governments and regulators everywhere. Safety first must also be the watchword for Member States considering the introduction of nuclear power. I believe that all IAEA Member States should have access to nuclear power if they wish to add it their energy mix. While it is up to each country to decide whether or not to opt for nuclear power, the IAEA has a key role to play in ensuring that the development of nuclear power programmes takes place in a safe, efficient, responsible and sustainable manner. The IAEA has developed guidelines and milestones to help countries work in a systematic way towards the introduction of nuclear power. Use of the 'Milestones' approach can increase transparency both within a country introducing nuclear power, and between it and other States. This brochure summarizes the services which the IAEA offers to Member States considering introducing nuclear power. These include advice on proper planning, building the required human resources and infrastructure, establishing legal and regulatory frameworks, and ensuring the highest standards of safety and security, without increasing proliferation risks. The IAEA offers independent know-how on the construction, commissioning, startup and operation of nuclear reactors. Through the Technical Cooperation programme, we provide targeted support to 'newcomer' countries in response to national development needs

  18. Power Electronic Packaging Design, Assembly Process, Reliability and Modeling

    CERN Document Server

    Liu, Yong

    2012-01-01

    Power Electronic Packaging presents an in-depth overview of power electronic packaging design, assembly,reliability and modeling. Since there is a drastic difference between IC fabrication and power electronic packaging, the book systematically introduces typical power electronic packaging design, assembly, reliability and failure analysis and material selection so readers can clearly understand each task's unique characteristics. Power electronic packaging is one of the fastest growing segments in the power electronic industry, due to the rapid growth of power integrated circuit (IC) fabrication, especially for applications like portable, consumer, home, computing and automotive electronics. This book also covers how advances in both semiconductor content and power advanced package design have helped cause advances in power device capability in recent years. The author extrapolates the most recent trends in the book's areas of focus to highlight where further improvement in materials and techniques can d...

  19. Digital Processor Module Reliability Analysis of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Lee, Sang Yong; Jung, Jae Hyun; Kim, Jae Ho; Kim, Sung Hun

    2005-01-01

    The system used in plant, military equipment, satellite, etc. consists of many electronic parts as control module, which requires relatively high reliability than other commercial electronic products. Specially, Nuclear power plant related to the radiation safety requires high safety and reliability, so most parts apply to Military-Standard level. Reliability prediction method provides the rational basis of system designs and also provides the safety significance of system operations. Thus various reliability prediction tools have been developed in recent decades, among of them, the MI-HDBK-217 method has been widely used as a powerful tool for the prediction. In this work, It is explained that reliability analysis work for Digital Processor Module (DPM, control module of SMART) is performed by Parts Stress Method based on MIL-HDBK-217F NOTICE2. We are using the Relex 7.6 of Relex software corporation, because reliability analysis process requires enormous part libraries and data for failure rate calculation

  20. Weibull distribution in reliability data analysis in nuclear power plant

    International Nuclear Information System (INIS)

    Ma Yingfei; Zhang Zhijian; Zhang Min; Zheng Gangyang

    2015-01-01

    Reliability is an important issue affecting each stage of the life cycle ranging from birth to death of a product or a system. The reliability engineering includes the equipment failure data processing, quantitative assessment of system reliability and maintenance, etc. Reliability data refers to the variety of data that describe the reliability of system or component during its operation. These data may be in the form of numbers, graphics, symbols, texts and curves. Quantitative reliability assessment is the task of the reliability data analysis. It provides the information related to preventing, detect, and correct the defects of the reliability design. Reliability data analysis under proceed with the various stages of product life cycle and reliability activities. Reliability data of Systems Structures and Components (SSCs) in Nuclear Power Plants is the key factor of probabilistic safety assessment (PSA); reliability centered maintenance and life cycle management. The Weibull distribution is widely used in reliability engineering, failure analysis, industrial engineering to represent manufacturing and delivery times. It is commonly used to model time to fail, time to repair and material strength. In this paper, an improved Weibull distribution is introduced to analyze the reliability data of the SSCs in Nuclear Power Plants. An example is given in the paper to present the result of the new method. The Weibull distribution of mechanical equipment for reliability data fitting ability is very strong in nuclear power plant. It's a widely used mathematical model for reliability analysis. The current commonly used methods are two-parameter and three-parameter Weibull distribution. Through comparison and analysis, the three-parameter Weibull distribution fits the data better. It can reflect the reliability characteristics of the equipment and it is more realistic to the actual situation. (author)

  1. Systems and methods for tracking a device in zero-infrastructure and zero-power conditions, and a tracking device therefor

    KAUST Repository

    Shamim, Atif; Bilal, Rana Muhammad

    2017-01-01

    and systems that enhance location determination in zero-infrastructure and zero-power conditions. In one example, a device, system and/or method includes an infrastructure-based localization module, an infrastructure-less localization module and a passive

  2. SNS AC Power Distribution and Reliability of AC Power Supply

    CERN Document Server

    Holik, Paul S

    2005-01-01

    The SNS Project has 45MW of installed power. A design description under the Construction Design and Maintenance (CDM) with regard to regulations (OSHA, NFPA, NEC), reliability issues and maintenance of the AC power distribution system are herewith presented. The SNS Project has 45MW of installed power. The Accelerator Systems are Front End (FE)and LINAC KLYSTRON Building (LK), Central Helium Liquefier (CHL), High Energy Beam Transport (HEBT), Accumulator Ring and Ring to Target Beam Transport (RTBT) Support Buildings have 30MW installed power. FELK has 16MW installed, majority of which is klystron and magnet power supply system. CHL, supporting the super conducting portion of the accelerator has 7MW installed power and the RING Systems (HEBT, RING and RTBT) have also 7MW installed power.*

  3. Development of the efficient emergency preparedness system for the nuclear critical infrastructure

    International Nuclear Information System (INIS)

    Kostadinov, V.; Marn, J.; Petelin, S.

    2007-01-01

    The evaluation of the critical nuclear infrastructure vulnerability to threats like human occurrences, terrorist attacks and natural disasters and the preparation of emergency response plans with the estimation of optimized costs are of the vital importance for the assurance of a safe nuclear facilities operation and the national security. In the past national emergency systems did not include vulnerability assessments of the critical nuclear infrastructure as the important part of the comprehensive preparedness framework. The fundamental aims of the efficient emergency preparedness and response system are to provide a sustained emergency readiness and to prevent an emergency situation and accidents. But when an event happens the mission is to mitigate consequences and to protect the people and environment against the nuclear and radiological damage. The efficient emergency response system, which would be activated in the case of the nuclear and/or radiological emergency and release of the radioactivity to the environment, is an important element of a comprehensive system of the nuclear and radiation safety. In the article the new methodology for the critical nuclear infrastructure vulnerability assessment as a missing part of an efficient emergency preparedness system is presented. It can help the overall national energy sectors to identify and better understand the terrorist threats and vulnerabilities of their critical infrastructure. The presented methodology could also facilitate national agencies to develop and implement a vulnerability awareness and education programs for their critical assets to enhance the security, reliability and safe operation of the whole energy infrastructure. The vulnerability assessment methodology will also assist nuclear power plants to develop, validate, and disseminate the assessment and survey of new efficient countermeasures. The significant benefits of the new vulnerability assessment research are to increase nuclear power

  4. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  5. An application of the fault tree analysis for the power system reliability estimation

    International Nuclear Information System (INIS)

    Volkanovski, A.; Cepin, M.; Mavko, B.

    2007-01-01

    The power system is a complex system with its main function to produce, transfer and provide consumers with electrical energy. Combinations of failures of components in the system can result in a failure of power delivery to certain load points and in some cases in a full blackout of power system. The power system reliability directly affects safe and reliable operation of nuclear power plants because the loss of offsite power is a significant contributor to the core damage frequency in probabilistic safety assessments of nuclear power plants. The method, which is based on the integration of the fault tree analysis with the analysis of the power flows in the power system, was developed and implemented for power system reliability assessment. The main contributors to the power system reliability are identified, both quantitatively and qualitatively. (author)

  6. Fault tolerant aggregation for power system services

    DEFF Research Database (Denmark)

    Kosek, Anna Magdalena; Gehrke, Oliver; Kullmann, Daniel

    2013-01-01

    number of small units. A common approach is to aggregate a portfolio of such units together and expose them to the power system as a single large virtual unit. In order to realize the vision of a Smart Grid, concepts for flexible, resilient and reliable aggregation infrastructures are required......Exploiting the flexibility in distributed energy resources (DER) is seen as an important contribution to allow high penetrations of renewable generation in electrical power systems. However, the present control infrastructure in power systems is not well suited for the integration of a very large...

  7. Influence of reliability of the relay protection to the whole reliability of electric power systems

    International Nuclear Information System (INIS)

    Stojanovski, Ljupcho I.

    2001-01-01

    The influence of the reliability of the elements of relay protection up today analyses of the reliability on electric power systems, very rare has been taken into consideration, in other words, in these analyses it is assumed that the reliability of the protection has value one. In this work an attempt is that through modelling of individual types of protection of the elements of high-voltage systems to make calculation to the influence of the reliability of the relay protection on the total reliability of the high-voltage systems.(Author)

  8. Reliability assessment of distribution power systems including distributed generations

    International Nuclear Information System (INIS)

    Megdiche, M.

    2004-12-01

    Nowadays, power systems have reached a good level of reliability. Nevertheless, considering the modifications induced by the connections of small independent producers to distribution networks, there's a need to assess the reliability of these new systems. Distribution networks present several functional characteristics, highlighted by the qualitative study of the failures, as dispersed loads at several places, variable topology and some electrotechnical phenomena which must be taken into account to model the events that can occur. The adopted reliability calculations method is Monte Carlo simulations, the probabilistic method most powerful and most flexible to model complex operating of the distribution system. We devoted a first part on the case of a 20 kV feeder to which a cogeneration unit is connected. The method was applied to a software of stochastic Petri nets simulations. Then a second part related to the study of a low voltage power system supplied by dispersed generations. Here, the complexity of the events required to code the method in an environment of programming allowing the use of power system calculations (load flow, short-circuit, load shedding, management of units powers) in order to analyse the system state for each new event. (author)

  9. Guide to Using Combined Heat and Power for Enhancing Reliability and Resiliency in Buildings

    Science.gov (United States)

    This guide provides an overview of CHP and examples of how this technology can help improve the resilience and reliability of key infrastructure, and is intended to assist those involved in the Hurricane Sandy rebuilding process.

  10. Validity and Reliability of a Medicine Ball Explosive Power Test.

    Science.gov (United States)

    Stockbrugger, Barry A.; Haennel, Robert G.

    2001-01-01

    Evaluated the validity and reliability of a medicine ball throw test to evaluate explosive power. Data on competitive sand volleyball players who performed a medicine ball throw and a standard countermovement jump indicated that the medicine ball throw test was a valid and reliable way to assess explosive power for an analogous total-body movement…

  11. Development of high-reliability control system for nuclear power plants

    International Nuclear Information System (INIS)

    Asami, K.; Yanai, K.; Hirose, H.; Ito, T.

    1983-01-01

    In Japan, many nuclear power generating plants are in operation and under construction. There is a general awareness of the problems in connection with nuclear power generation and strong emphasis is put on achieving highly reliable operation of nuclear power plants. Hitachi has developed a new high-reliability control system. NURECS-3000 (NUclear Power Plant High-REliability Control System), which is applied to the main control systems, such as the reactor feedwater control system, the reactor recirculation control system and the main turbine control system. The NURECS-3000 system was designed taking into account the fact that there will be failures, but the aim is for the system to continue to function correctly; it is therefore a fault-tolerant system. It has redundant components which can be completely isolated from each other in order to prevent fault propagation. The system has a hierarchical configuration, with a main controller, consisting of a triplex microcomputer system, and sub-loop controllers. Special care was taken to ensure the independence of these subsystems. Since most of the redundant system failures are caused by common-mode failures and the reliability of redundant systems depends on the reliability of the common-mode parts, the aim was to minimize these parts. (author)

  12. Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical elements

    International Nuclear Information System (INIS)

    Zio, E.; Golea, L.R.

    2012-01-01

    The subject of this paper is the analysis of an electrical transmission system with the objective of identifying its most critical elements with respect to failures and attacks. The methodological approach undertaken is based on graph-theoretical (topological) network analysis. Four different perspectives of analysis are considered within the formalism of weighed networks, adding to the purely topological analysis of the system, the reliability and electrical characteristics of its components. In each phase of the analysis: i) a graph-theoretical representation is offered to highlight the structure of the most important system connections according to the particular characteristics examined (topological, reliability, electrical or electrical-reliability), ii) the classical degree index of a network node is extended to account for the different characteristics considered. The application of these concepts of analysis to an electrical transmission system of literature confirms the importance of different perspectives of analysis on such a critical infrastructure. - Highlights: ► We analyze a power system from topological, reliability and electrical perspectives. ► We rank critical components within a vulnerability assessment framework. ► We compute an extended degree to rank critical energy paths. ► We compare several analytical approaches and provide a table for choosing among them. ► We suggest network changes to increase the reliability of highly loaded energy paths.

  13. Reliability of nuclear power plants and equipment

    International Nuclear Information System (INIS)

    1985-01-01

    The standard sets the general principles, a list of reliability indexes and demands on their selection. Reliability indexes of nuclear power plants include the simple indexes of fail-safe operation, life and maintainability, and of storage capability. All terms and notions are explained and methods of evaluating the indexes briefly listed - statistical, and calculation experimental. The dates when the standard comes in force in the individual CMEA countries are given. (M.D.)

  14. Transmission cost allocation based on power flow tracing considering reliability benefit

    International Nuclear Information System (INIS)

    Leepreechanon, N.; Singharerg, S.; Padungwech, W.; Nakawiro, W.; Eua-Arporn, B.; David, A.K.

    2007-01-01

    Power transmission networks must be able to accommodate the continuously growing demand for reliable and economical electricity. This paper presented a method to allocate transmission use and reliability cost to both generators and end-consumers. Although transmission cost allocation methods change depending on the local context of the electric power industry, there is a common principle that transmission line capacity should be properly allocated to accommodate actual power delivery with an adequate reliability margin. The method proposed in this paper allocates transmission embedded cost to both generators and loads in an equitable manner, incorporating probability indices to allocate transmission reliability margin among users in both supply and demand sides. The application of the proposed method was illustrated using Bialek's tracing method on a multiple-circuit, six-bus transmission system. Probabilistic indices known as the transmission internal reliability margin (TIRM) and transmission external reliability margin (TERM) decomposed from the transmission reliability margin (TRM) were introduced, making true cost of using overall transmission facilities. 6 refs., 11 tabs., 5 figs

  15. Power plant reliability calculation with Markov chain models

    International Nuclear Information System (INIS)

    Senegacnik, A.; Tuma, M.

    1998-01-01

    In the paper power plant operation is modelled using continuous time Markov chains with discrete state space. The model is used to compute the power plant reliability and the importance and influence of individual states, as well as the transition probabilities between states. For comparison the model is fitted to data for coal and nuclear power plants recorded over several years. (orig.) [de

  16. Bayesian approach in the power electric systems study of reliability ...

    African Journals Online (AJOL)

    Keywords: Reliability - Power System - Bayes Theorem - Weibull Model - Probability. ... ensure a series of estimated parameter (failure rate, mean time to failure, function .... only on random variable r.v. describing the operating conditions: ..... Multivariate performance reliability prediction in real-time, Reliability Engineering.

  17. Incorporating Cyber Layer Failures in Composite Power System Reliability Evaluations

    Directory of Open Access Journals (Sweden)

    Yuqi Han

    2015-08-01

    Full Text Available This paper proposes a novel approach to analyze the impacts of cyber layer failures (i.e., protection failures and monitoring failures on the reliability evaluation of composite power systems. The reliability and availability of the cyber layer and its protection and monitoring functions with various topologies are derived based on a reliability block diagram method. The availability of the physical layer components are modified via a multi-state Markov chain model, in which the component protection and monitoring strategies, as well as the cyber layer topology, are simultaneously considered. Reliability indices of composite power systems are calculated through non-sequential Monte-Carlo simulation. Case studies demonstrate that operational reliability downgrades in cyber layer function failure situations. Moreover, protection function failures have more significant impact on the downgraded reliability than monitoring function failures do, and the reliability indices are especially sensitive to the change of the cyber layer function availability in the range from 0.95 to 1.

  18. Reliability of diesel generators in the Finnish and Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Pulkkinen, U.; Huovinen, T.; Norros, L.; Vanhala, J.

    1989-10-01

    Diesel generators are used as emergency AC-power sources in nuclear power plants and they produce electric power for other emergency systems during accidents in which offsite power is lost. The reliability of diesel generators is thus of major concern for overall safety of nuclear power plants. In this study we consider the reliability of diesel generators in the Swedish and Finnish nuclear power plants on the basis of collected operational experience. We classify the occurred failures according to their functional criticality, type and cause. The failures caused by human errors in maintenance and testing are analysed in detail. We analyse also the reliability of the diesel generator subsystems. Further, we study the effect of surveillance test and the type of test on the reliability. Finally we construct an unavailability model for single diesel generator unit and discuss the findings of the study giving some practical recommendations

  19. Guest Editorial Special Issue on Power Quality in Smart Grids

    DEFF Research Database (Denmark)

    Guerrero, Josep M.

    2017-01-01

    -healing from power disturbances, efficient energy management, automation based on ICT and advanced metering infrastructures (smart metering), integration of distributed power generation, renewable energy resources and storage units as well as high power quality and reliability. In this regard, the concept...

  20. Integrated Evaluation of Reliability and Power Consumption of Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Antônio Dâmaso

    2017-11-01

    Full Text Available Power consumption is a primary interest in Wireless Sensor Networks (WSNs, and a large number of strategies have been proposed to evaluate it. However, those approaches usually neither consider reliability issues nor the power consumption of applications executing in the network. A central concern is the lack of consolidated solutions that enable us to evaluate the power consumption of applications and the network stack also considering their reliabilities. To solve this problem, we introduce a fully automatic solution to design power consumption aware WSN applications and communication protocols. The solution presented in this paper comprises a methodology to evaluate the power consumption based on the integration of formal models, a set of power consumption and reliability models, a sensitivity analysis strategy to select WSN configurations and a toolbox named EDEN to fully support the proposed methodology. This solution allows accurately estimating the power consumption of WSN applications and the network stack in an automated way.

  1. Integrated Evaluation of Reliability and Power Consumption of Wireless Sensor Networks

    Science.gov (United States)

    Dâmaso, Antônio; Maciel, Paulo

    2017-01-01

    Power consumption is a primary interest in Wireless Sensor Networks (WSNs), and a large number of strategies have been proposed to evaluate it. However, those approaches usually neither consider reliability issues nor the power consumption of applications executing in the network. A central concern is the lack of consolidated solutions that enable us to evaluate the power consumption of applications and the network stack also considering their reliabilities. To solve this problem, we introduce a fully automatic solution to design power consumption aware WSN applications and communication protocols. The solution presented in this paper comprises a methodology to evaluate the power consumption based on the integration of formal models, a set of power consumption and reliability models, a sensitivity analysis strategy to select WSN configurations and a toolbox named EDEN to fully support the proposed methodology. This solution allows accurately estimating the power consumption of WSN applications and the network stack in an automated way. PMID:29113078

  2. Effect of dc-power-system reliability on reactor-shutdown cooling

    International Nuclear Information System (INIS)

    Kolaczkowski, A.M.; Baranowsky, P.W.; Hickman, J.W.

    1981-01-01

    The DC power systems in a nuclear power plant provide control and motive power to valves, instrumentation, emergency diesel generators, and many other components and systems during all phases of plant operation including abnormal shutdowns and accident situations. A specific area of concern is the adequacy of the minimum design requirements for DC power systems, particularly with regard to multiple and common cause failures. This concern relates to the application of the single failure criterion for assuring a reliable DC power supply which may be required for the functionability of shutdown cooling systems. The results are presented of a reliability based study performed to assess the adequacy of DC power supply design requirements for currently operating light water reactors with particular attention to shutdown cooling requirements

  3. Running a reliable messaging infrastructure for CERN's control system

    International Nuclear Information System (INIS)

    Ehm, F.

    2012-01-01

    The current middle-ware for CERN's Control System is based on 2 implementations: CORBA-based Controls Middle-Ware (CMW) and Java Messaging Service (JMS). The JMS service is realized using the open source messaging product ActiveMQ and had became an increasing vital part of beam operations as data need to be transported reliably for various areas such as the beam protection system, post mortem analysis, beam commissioning or the alarm system. The current JMS service is made of 18 brokers running either in clusters or as single nodes. The main service is deployed as a 2 node cluster providing fail-over and load balancing capabilities for high availability. Non-critical applications running on virtual machines or desktop machines read data via a third broker to decouple the load from the operational main cluster. This scenario has been introduced last year and the statistics showed an up-time of 99.998% and an average data serving rate of 1.6 G-Byte per minute represented by around 150 messages per second. Deploying, running, maintaining and protecting such messaging infrastructure is not trivial and includes setting up of careful monitoring and failure pre-recognition. Naturally, lessons have been learnt and their outcome is very important for the current and future operation of such service. (author)

  4. Guidelines for Preparing and Conducting an Integrated Nuclear Infrastructure Review (INIR)

    International Nuclear Information System (INIS)

    2017-01-01

    As of 1 July 2017, there were 447 operational nuclear power reactors in 30 countries and another 60 were under construction in 15 countries. Technically and financially, access to nuclear power is no longer limited to advanced economies. Many developing countries are interested in introducing or expanding nuclear energy programmes because they regard nuclear power as a stable and reliable source of baseload electricity, which, in addition, makes a significant contribution to climate change mitigation. While several operating countries are planning to expand current capacity, about 30 Member States, mostly developing countries, are considering embarking on a nuclear power programme, some are developing the necessary infrastructure, and some others are negotiating or building their first nuclear power plant. Building a nuclear power programme is a major undertaking with significant international implications and is based upon a commitment to use nuclear power for peaceful purposes, in a safe, secure and sustainable manner. This commitment requires establishing a sustainable national infrastructure that provides governmental, legal, regulatory, managerial, technological, human resource, industrial and stakeholder support for the nuclear power programme throughout its life cycle. The demonstration of compliance with international legal instruments, internationally accepted nuclear safety standards, nuclear security guidelines and safeguards requirements is essential in establishing a responsible nuclear power programme. In response to growing demand by embarking countries for advice and assistance, the IAEA has developed an approach to assist Member States that are considering or planning their first nuclear power plant to understand the commitments and obligations associated with developing a nuclear power programme. States that already have nuclear power can also assess their preparedness for expansion. This approach is set out in the publication Milestones in the

  5. Applying reliability analysis to design electric power systems for More-electric aircraft

    Science.gov (United States)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  6. Providing all global energy with wind, water, and solar power, Part II: Reliability, system and transmission costs, and policies

    International Nuclear Information System (INIS)

    Delucchi, Mark A.; Jacobson, Mark Z.

    2011-01-01

    This is Part II of two papers evaluating the feasibility of providing all energy for all purposes (electric power, transportation, and heating/cooling), everywhere in the world, from wind, water, and the sun (WWS). In Part I, we described the prominent renewable energy plans that have been proposed and discussed the characteristics of WWS energy systems, the global demand for and availability of WWS energy, quantities and areas required for WWS infrastructure, and supplies of critical materials. Here, we discuss methods of addressing the variability of WWS energy to ensure that power supply reliably matches demand (including interconnecting geographically dispersed resources, using hydroelectricity, using demand-response management, storing electric power on site, over-sizing peak generation capacity and producing hydrogen with the excess, storing electric power in vehicle batteries, and forecasting weather to project energy supplies), the economics of WWS generation and transmission, the economics of WWS use in transportation, and policy measures needed to enhance the viability of a WWS system. We find that the cost of energy in a 100% WWS will be similar to the cost today. We conclude that barriers to a 100% conversion to WWS power worldwide are primarily social and political, not technological or even economic. - Research highlights: → We evaluate the feasibility of global energy supply from wind, water, and solar energy. → WWS energy can be supplied reliably and economically to all energy-use sectors. → The social cost of WWS energy generally is less than the cost of fossil-fuel energy. → Barriers to 100% WWS power worldwide are socio-political, not techno-economic.

  7. Cote D’voire National Presentation on Nuclear Power Infrastructure Evaluation

    International Nuclear Information System (INIS)

    2010-01-01

    Limited production capacity to meet energy demand is 1316 MW in 2010 with impossibility to satisfy the demand in the high scenario of 41 000 GWh in 2020. There is necessity of using other sources of production that include nuclear power plant for a mass production. NEPIO not formally established, its establishment is underway to implement the entire infrastructure necessary to achieve the nuclear power plant in Côte d’Ivoire. Projects of nuclear law and decree were drawn up with the legal assistance of the IAEA. Universities and engineers schools do not offer courses adapted to the development of a nuclear industry. Therefore the Government is taking measures for implementation of the NEPIO and ratifying all the international agreement connected to nuclear power plant. Face to the constantly increasing energy demand, Côte d’Ivoire showed its intention to develop an nuclear power programme for the satisfaction of needs by 2025. To implement this programme, a national strategic plan has been established

  8. Theory model and experiment research about the cognition reliability of nuclear power plant operators

    International Nuclear Information System (INIS)

    Fang Xiang; Zhao Bingquan

    2000-01-01

    In order to improve the reliability of NPP operation, the simulation research on the reliability of nuclear power plant operators is needed. Making use of simulator of nuclear power plant as research platform, and taking the present international reliability research model-human cognition reliability for reference, the part of the model is modified according to the actual status of Chinese nuclear power plant operators and the research model of Chinese nuclear power plant operators obtained based on two-parameter Weibull distribution. Experiments about the reliability of nuclear power plant operators are carried out using the two-parameter Weibull distribution research model. Compared with those in the world, the same results are achieved. The research would be beneficial to the operation safety of nuclear power plant

  9. Design for Reliability of Power Electronics in Renewable Energy Systems

    DEFF Research Database (Denmark)

    Ma, Ke; Yang, Yongheng; Wang, Huai

    2014-01-01

    Power electronics is the enabling technology for maximizing the power captured from renewable electrical generation, e.g., the wind and solar technology, and also for an efficient integration into the grid. Therefore, it is important that the power electronics are reliable and do not have too many...... failures during operation which otherwise will increase cost for operation, maintenance and reputation. Typically, power electronics in renewable electrical generation has to be designed for 20–30 years of operation, and in order to do that, it is crucial to know about the mission profile of the power...... electronics technology as well as to know how the power electronics technology is loaded in terms of temperature and other stressors relevant, to reliability. Hence, this chapter will show the basics of power electronics technology for renewable energy systems, describe the mission profile of the technology...

  10. Designing incentive market mechanisms for improving restructured power system reliabilities

    DEFF Research Database (Denmark)

    Ding, Yi; Østergaard, Jacob; Wu, Qiuwei

    2011-01-01

    state. The reliability management of producers usually cannot be directly controlled by the system operators in a restructured power system. Producers may have no motivation to improve their reliabilities, which can result in serious system unreliability issues in the new environment. Incentive market...... mechanisms for improving the restructured power system reliabilities have been designed in this paper. In the proposed incentive mechanisms, penalty will be implemented on a producer if the failures of its generator(s) result in the variation of electricity prices. Incentive market mechanisms can motivate......In a restructured power system, the monopoly generation utility is replaced by different electricity producers. There exists extreme price volatility caused by random failures by generation or/and transmission systems. In these cases, producers' profits can be much higher than those in the normal...

  11. Integrated approach to economical, reliable, safe nuclear power production

    International Nuclear Information System (INIS)

    1982-06-01

    An Integrated Approach to Economical, Reliable, Safe Nuclear Power Production is the latest evolution of a concept which originated with the Defense-in-Depth philosophy of the nuclear industry. As Defense-in-Depth provided a framework for viewing physical barriers and equipment redundancy, the Integrated Approach gives a framework for viewing nuclear power production in terms of functions and institutions. In the Integrated Approach, four plant Goals are defined (Normal Operation, Core and Plant Protection, Containment Integrity and Emergency Preparedness) with the attendant Functional and Institutional Classifications that support them. The Integrated Approach provides a systematic perspective that combines the economic objective of reliable power production with the safety objective of consistent, controlled plant operation

  12. Reliability considerations of a fuel cell backup power system for telecom applications

    Science.gov (United States)

    Serincan, Mustafa Fazil

    2016-03-01

    A commercial fuel cell backup power unit is tested in real life operating conditions at a base station of a Turkish telecom operator. The fuel cell system responds to 256 of 260 electric power outages successfully, providing the required power to the base station. Reliability of the fuel cell backup power unit is found to be 98.5% at the system level. On the other hand, a qualitative reliability analysis at the component level is carried out. Implications of the power management algorithm on reliability is discussed. Moreover, integration of the backup power unit to the base station ecosystem is reviewed in the context of reliability. Impact of inverter design on the stability of the output power is outlined. Significant current harmonics are encountered when a generic inverter is used. However, ripples are attenuated significantly when a custom design inverter is used. Further, fault conditions are considered for real world case studies such as running out of hydrogen, a malfunction in the system, or an unprecedented operating scheme. Some design guidelines are suggested for hybridization of the backup power unit for an uninterrupted operation.

  13. Reliability Analysis Techniques for Communication Networks in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Lim, T. J.; Jang, S. C.; Kang, H. G.; Kim, M. C.; Eom, H. S.; Lee, H. J.

    2006-09-01

    The objectives of this project is to investigate and study existing reliability analysis techniques for communication networks in order to develop reliability analysis models for nuclear power plant's safety-critical networks. It is necessary to make a comprehensive survey of current methodologies for communication network reliability. Major outputs of this study are design characteristics of safety-critical communication networks, efficient algorithms for quantifying reliability of communication networks, and preliminary models for assessing reliability of safety-critical communication networks

  14. The Test-Retest Reliability of New Generation Power Indices of Wingate All-Out Test

    Directory of Open Access Journals (Sweden)

    Ozgur Ozkaya

    2018-04-01

    Full Text Available Although reliability correlations of traditional power indices of the Wingate test have been well documented, no study has analyzed new generation power indices based on milliseconds obtained from a Peak Bike. The purpose of this study was to investigate the retest reliability of new generation power indices. Thirty-two well-trained male athletes who were specialized in basketball, football, tennis, or track and field volunteered to take part in the study (age: 24.3 ± 2.2 years; body mass: 77 ± 8.3 kg; height: 180.3 ± 6.3 cm. Participants performed two Wingate all-out sessions on two separate days. Intra-class correlation coefficient (ICC, standard error measurement (SEM, smallest real differences (SRD and coefficient of variation (CV scores were analyzed based on the test and retest data. Reliability results of traditional power indices calculated based on 5-s means such as peak power, average power, power drop, and fatigue index ratio were similar with the previous findings in literature (ICC ≥ 0.94; CV ≤ 2.8%; SEM ≤ 12.28; SRD% ≤ 7.7%. New generation power indices such as peak power, average power, lowest power, power drop, fatigue index, power decline, maximum speed as rpm, and amount of total energy expenditure demonstrated high reliability (ICC ≥ 0.94; CV ≤ 4.3%; SEM ≤ 10.36; SRD% ≤ 8.8%. Time to peak power, time at maximum speed, and power at maximum speed showed a moderate level of reliability (ICC ≥ 0.73; CV ≤ 8.9%; SEM ≤ 63.01; SRD% ≤ 22.4%. The results of this study indicate that reliability correlations and SRD% of new generation power and fatigue-related indices are similar with traditional 5-s means. However, new time-related indices are very sensitive and moderately reliable.

  15. Reliability methods in nuclear power plant ageing management

    International Nuclear Information System (INIS)

    Simola, K.

    1999-01-01

    The aim of nuclear power plant ageing management is to maintain an adequate safety level throughout the lifetime of the plant. In ageing studies, the reliability of components, systems and structures is evaluated taking into account the possible time-dependent degradation. The phases of ageing analyses are generally the identification of critical components, identification and evaluation of ageing effects, and development of mitigation methods. This thesis focuses on the use of reliability methods and analyses of plant- specific operating experience in nuclear power plant ageing studies. The presented applications and method development have been related to nuclear power plants, but many of the approaches can also be applied outside the nuclear industry. The thesis consists of a summary and seven publications. The summary provides an overview of ageing management and discusses the role of reliability methods in ageing analyses. In the publications, practical applications and method development are described in more detail. The application areas at component and system level are motor-operated valves and protection automation systems, for which experience-based ageing analyses have been demonstrated. Furthermore, Bayesian ageing models for repairable components have been developed, and the management of ageing by improving maintenance practices is discussed. Recommendations for improvement of plant information management in order to facilitate ageing analyses are also given. The evaluation and mitigation of ageing effects on structural components is addressed by promoting the use of probabilistic modelling of crack growth, and developing models for evaluation of the reliability of inspection results. (orig.)

  16. Reliability methods in nuclear power plant ageing management

    Energy Technology Data Exchange (ETDEWEB)

    Simola, K. [VTT Automation, Espoo (Finland). Industrial Automation

    1999-07-01

    The aim of nuclear power plant ageing management is to maintain an adequate safety level throughout the lifetime of the plant. In ageing studies, the reliability of components, systems and structures is evaluated taking into account the possible time-dependent degradation. The phases of ageing analyses are generally the identification of critical components, identification and evaluation of ageing effects, and development of mitigation methods. This thesis focuses on the use of reliability methods and analyses of plant- specific operating experience in nuclear power plant ageing studies. The presented applications and method development have been related to nuclear power plants, but many of the approaches can also be applied outside the nuclear industry. The thesis consists of a summary and seven publications. The summary provides an overview of ageing management and discusses the role of reliability methods in ageing analyses. In the publications, practical applications and method development are described in more detail. The application areas at component and system level are motor-operated valves and protection automation systems, for which experience-based ageing analyses have been demonstrated. Furthermore, Bayesian ageing models for repairable components have been developed, and the management of ageing by improving maintenance practices is discussed. Recommendations for improvement of plant information management in order to facilitate ageing analyses are also given. The evaluation and mitigation of ageing effects on structural components is addressed by promoting the use of probabilistic modelling of crack growth, and developing models for evaluation of the reliability of inspection results. (orig.)

  17. System-level Reliability Assessment of Power Stage in Fuel Cell Application

    DEFF Research Database (Denmark)

    Zhou, Dao; Wang, Huai; Blaabjerg, Frede

    2016-01-01

    reliability. In a case study of a 5 kW fuel cell power stage, the parameter variations of the lifetime model prove that the exponential factor of the junction temperature fluctuation is the most sensitive parameter. Besides, if a 5-out-of-6 redundancy is used, it is concluded both the B10 and the B1 system......High efficient and less pollutant fuel cell stacks are emerging and strong candidates of the power solution used for mobile base stations. In the application of the backup power, the availability and reliability hold the highest priority. This paper considers the reliability metrics from...... the component-level to the system-level for the power stage used in a fuel cell application. It starts with an estimation of the annual accumulated damage for the key power electronic components according to the real mission profile of the fuel cell system. Then, considering the parameter variations in both...

  18. Reliability analysis of the automatic control and power supply of reactor equipment

    International Nuclear Information System (INIS)

    Monori, Pal; Nagy, J.A.; Meszaros, Zoltan; Konkoly, Laszlo; Szabo, Antal; Nagy, Laszlo

    1988-01-01

    Based on reliability analysis the shortcomings of nuclear facilities are discovered. Fault tree types constructed for the technology of automatic control and for power supply serve as input data of the ORCHARD 2 computer code. In order to charaterize the reliability of the system, availability, failure rates and time intervals between failures are calculated. The results of the reliability analysis of the feedwater system of the Paks Nuclear Power Plant showed that the system consisted of elements of similar reliabilities. (V.N.) 8 figs.; 3 tabs

  19. Impacts of Contingency Reserve on Nodal Price and Nodal Reliability Risk in Deregulated Power Systems

    DEFF Research Database (Denmark)

    Zhao, Qian; Wang, Peng; Goel, Lalit

    2013-01-01

    The deregulation of power systems allows customers to participate in power market operation. In deregulated power systems, nodal price and nodal reliability are adopted to represent locational operation cost and reliability performance. Since contingency reserve (CR) plays an important role...... in reliable operation, the CR commitment should be considered in operational reliability analysis. In this paper, a CR model based on customer reliability requirements has been formulated and integrated into power market settlement. A two-step market clearing process has been proposed to determine generation...

  20. Validity And Reliability Of The Stages Cycling Power Meter.

    Science.gov (United States)

    Granier, Cyril; Hausswirth, Christophe; Dorel, Sylvain; Yann, Le Meur

    2017-09-06

    This study aimed to determine the validity and the reliability of the Stages power meter crank system (Boulder, United States) during several laboratory cycling tasks. Eleven trained participants completed laboratory cycling trials on an indoor cycle fitted with SRM Professional and Stages systems. The trials consisted of an incremental test at 100W, 200W, 300W, 400W and four 7s sprints. The level of pedaling asymmetry was determined for each cycling intensity during a similar protocol completed on a Lode Excalibur Sport ergometer. The reliability of Stages and SRM power meters was compared by repeating the incremental test during a test-retest protocol on a Cyclus 2 ergometer. Over power ranges of 100-1250W the Stages system produced trivial to small differences compared to the SRM (standardized typical error values of 0.06, 0.24 and 0.08 for the incremental, sprint and combined trials, respectively). A large correlation was reported between the difference in power output (PO) between the two systems and the level of pedaling asymmetry (r=0.58, p system according to the level of pedaling asymmetry provided only marginal improvements in PO measures. The reliability of the Stages power meter at the sub-maximal intensities was similar to the SRM Professional model (coefficient of variation: 2.1 and 1.3% for Stages and SRM, respectively). The Stages system is a suitable device for PO measurements, except when a typical error of measurement power ranges of 100-1250W is expected.

  1. Application of genetic algorithm for reliability allocation in nuclear power plants

    International Nuclear Information System (INIS)

    Yang, Joon-Eon; Hwang, Mee-Jung; Sung, Tae-Yong; Jin, Youngho

    1999-01-01

    Reliability allocation is an optimization process of minimizing the total plant costs subject to the overall plant safety goal constraints. Reliability allocation was applied to determine the reliability characteristics of reactor systems, subsystems, major components and plant procedures that are consistent with a set of top-level performance goals; the core melt frequency, acute fatalities and latent fatalities. Reliability allocation can be performed to improve the design, operation and safety of new and/or existing nuclear power plants. Reliability allocation is a kind of a difficult multi-objective optimization problem as well as a global optimization problem. The genetic algorithm, known as one of the most powerful tools for most optimization problems, is applied to the reliability allocation problem of a typical pressurized water reactor in this article. One of the main problems of reliability allocation is defining realistic objective functions. Hence, in order to optimize the reliability of the system, the cost for improving and/or degrading the reliability of the system should be included in the reliability allocation process. We used techniques derived from the value impact analysis to define the realistic objective function in this article

  2. Design for Reliability of Power Electronics for Grid-Connected Photovoltaic Systems

    DEFF Research Database (Denmark)

    Yang, Yongheng; Sangwongwanich, Ariya; Blaabjerg, Frede

    2016-01-01

    Power electronics is the enabling technology for optimizing energy harvesting from renewable systems like Photovoltaic (PV) and wind power systems, and also for interfacing grid-friendly energy systems. Advancements in the power semiconductor technology (e.g., wide band-gap devices) have pushed...... the conversion efficiency of power electronics to above 98%, where however te reliability of power electronics is becoming of high concern. Therefore, it is important to design for reliable power electronic systems to lower the risks of many failures during operation; otherwise will increase the cost...... for maintenance and reputation, thus affecting the cost of PV energy. Today's PV power conversion applications require the power electronic systems with low failure rates during a service life of 20 years or even more. To achieve so, it is vital to know the main life-limiting factors of power electronic systems...

  3. Reactor fuel reliability constraints on power shape control

    International Nuclear Information System (INIS)

    Gelhaus, F.; Hallam, J.; Sauar, T.

    1977-01-01

    The level of reliability of fuel rods operating in commercial nuclear power plants has been less than desired for a number of reasons. Several of these causes have been successfully minimized, but pellet-clad interaction failures persist. Since power and power change are dominant parameters in this failure mode, restrictions on operational maneuvers have been recommended by all U. S. fuel suppliers. Slower-than-design allowable maneuvers decrease the plant capacity factor, which can cost a utility up to $7 million per year per plant. To assist utility engineering and operations personnel in their day-to-day decisions in this regard, the Electric Power Research Institute (EPRI) is initiating a project, designated RP895, to develop a fully computerized Power Shape Monitoring System (PSMS) for core-wide fuel rod reliability prediction. This paper describes the PSMS system and details some of the hardware/software requirements as they are now perceived. Salient results from a just-completed complementary EPRI-funded study, RP509, are described; this effort employed hand data acquisition and many man-machine interfaces that will be fully integrated and automated in the PSMS. The capabilities of the PSMS will derive from the use of modern minicomputer hardware and software and from accurate computational modules that enable near-real-time predictive capability

  4. Modeling high-Power Accelerators Reliability-SNS LINAC (SNS-ORNL); MAX LINAC (MYRRHA)

    International Nuclear Information System (INIS)

    Pitigoi, A. E.; Fernandez Ramos, P.

    2013-01-01

    Improving reliability has recently become a very important objective in the field of particle accelerators. The particle accelerators in operation are constantly undergoing modifications, and improvements are implemented using new technologies, more reliable components or redundant schemes (to obtain more reliability, strength, more power, etc.) A reliability model of SNS (Spallation Neutron Source) LINAC has been developed within MAX project and analysis of the accelerator systems reliability has been performed within the MAX project, using the Risk Spectrum reliability analysis software. The analysis results have been evaluated by comparison with the SNS operational data. Results and conclusions are presented in this paper, oriented to identify design weaknesses and provide recommendations for improving reliability of MYRRHA linear accelerator. The SNS reliability model developed for the MAX preliminary design phase indicates possible avenues for further investigation that could be needed to improve the reliability of the high-power accelerators, in view of the future reliability targets of ADS accelerators.

  5. Study on the reliability of large coal-fired and nuclear power plants. Factors affecting power plant reliability. Volume I. Final report

    International Nuclear Information System (INIS)

    1975-01-01

    The study consisted of a comparative evaluation of 2 nuclear units (Indian Point 2 - Consolidated Edison of New York, Turkey Point 4 - Florida Power and Light Company) and 2 coal-fired units (Bull Run and Widows Creek Unit 8 - Tennessee Valley Authority). The purpose of the study was to identify and assess the underlying causes of unit reliability and the causes of the observed differences in reliability performance of the units. Recommended actions for improving the reliability of one of the study units was to be presented in a format useful to other utility companies for improving reliability of their generating units. The emphasis of the study was on the aspects of management, manning, operations, and maintenance which had a significant impact on unit reliability. Volume 1 includes a summary, a description of the major findings from the comparative evaluation, conclusions based on these findings, and recommendations for improving the reliability of the below average units

  6. Performance and reliability of TPE-2 device with pulsed high power source

    International Nuclear Information System (INIS)

    Sato, Y.; Takeda, S.; Kiyama, S.

    1987-01-01

    The performance and the reliability of TPE-2 device with pulsed high power sources are described. To obtain the stable high beta plasma, the reproducibility and the reliability of the pulsed power sources must be maintained. A new power crowbar system with high efficiency and the switches with low jitter time are adopted to the bank system. A monitor system which always watches the operational states of the switches is developed too, and applied for the fast rising capacitor banks of TPE-2 device. The reliable operation for the bank has been realized, based on the data of switch monitor system

  7. Risk and Reliability of Infrastructure Asset Management Workshop

    National Research Council Canada - National Science Library

    2006-01-01

    A workshop was held August 15-18 in Alexandria, Virginia to begin the dialog on the methodologies available and the status of how the US Army Corps of Engineers assesses its Civil Works infrastructure...

  8. Reliability Electrical Power System of Hospital as Cold Standby System

    Directory of Open Access Journals (Sweden)

    Grabski Franciszek

    2016-07-01

    Full Text Available The probabilistic model of a hospital electrical power system consisting of mains, an emergency power system and the automatic transfer switch with the generator starter are discussed in this paper. The reliability model is semi-Markov process describing two different units renewable cold standby system and switch. The embedded Semi-Markov processes concept is applied for description of the system evolution. Time to failure of the system is represented by a random variable denoting the first passage time of the process from the given state to the subset of states. The appropriate theorems of the Semi-Markov processes theory allow us to evaluate the reliability function and some reliability characteristics.

  9. Windfarm Generation Assessment for ReliabilityAnalysis of Power Systems

    DEFF Research Database (Denmark)

    Negra, Nicola Barberis; Holmstrøm, Ole; Bak-Jensen, Birgitte

    2007-01-01

    Due to the fast development of wind generation in the past ten years, increasing interest has been paid to techniques for assessing different aspects of power systems with a large amount of installed wind generation. One of these aspects concerns power system reliability. Windfarm modelling plays...

  10. Windfarm generation assessment for reliability analysis of power systems

    DEFF Research Database (Denmark)

    Negra, N.B.; Holmstrøm, O.; Bak-Jensen, B.

    2007-01-01

    Due to the fast development of wind generation in the past ten years, increasing interest has been paid to techniques for assessing different aspects of power systems with a large amount of installed wind generation. One of these aspects concerns power system reliability. Windfarm modelling plays...

  11. Assessing Changes in the Reliability of the U.S. Electric Power System

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Stanford Univ., CA (United States). Dept. of Physics; LaCommare, Kristina H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sweeney, James L. [Stanford Univ., CA (United States)

    2015-08-01

    Over the past 15 years, the most well-publicized efforts to assess trends in U.S. electric power system reliability have focused only on a subset of all power interruption events (see, for example, Amin 2008 and Campbell 2012)—namely, only the very largest events, which trigger immediate emergency reporting to federal agencies and industry regulators. Anecdotally, these events are thought by many to represent no more than 10% of the power interruptions experienced annually by electricity consumers. Moreover, a review of these emergency reports has identified shortcomings in relying on these data as reliable sources for assessing trends, even with the reliability events they report (Fisher et al. 2012). Recent work has begun to address these limitations by examining trends in reliability data collected annually by electricity distribution companies (Eto et al. 2012). In principle, all power interruptions experienced by electricity customers, regardless of size, are recorded by the distribution utility. Moreover, distribution utilities have a long history of recording this information, often in response to mandates from state public utility commissions (Eto et al. 2006). Thus, studies that rely on reliability data collected by distribution utilities can, in principle, provide a more complete basis upon which to assess trends or changes in reliability over time.

  12. Microwave Power Beaming Infrastructure for Manned Lightcraft Operations: Part 2

    International Nuclear Information System (INIS)

    Myrabo, Leik N.

    2008-01-01

    In the past ∼7 years, microwave gyrotron technology has rapidly evolved to a critical threshold wherein ultra-energetic space launch missions based on beamed energy propulsion (BEP) now appear eminently feasible. Over the next 20 years, hundred megawatt-class microwave power-beaming stations could be prototyped on high deserts and 3- to 4 km mountain peaks before migrating into low Earth orbit, along with their passive microwave relay satellites. Described herein is a 20 GW rechargeable nuclear power satellite and microwave power-beaming infrastructure designed for manned space launch operations in the year 2025. The technological readiness of 2500 GJ superconducting magnetic energy storage 'batteries', 433-m ultralight space structures, 100 MW liquid droplet radiators, 1-6+ MW gyrotron sources, and mega-scale arrays (e.g., 3000 phase-locked units) is addressed. Microwave BEP is 'breakthrough' technology with the very real potential to radically reduce space access costs by factors of 100 to 1000 in the forseeable future

  13. Assessment of power reliability and improvement potential by using ...

    African Journals Online (AJOL)

    This paper presents the use of smart reclosers for improving reliability of a distribution system of one of the major cities of Ethiopia. As frequent power interruptions are posing a huge problem to the life of the people and the economy, finding a solution to the problem is very essential. Electric reliability has affected social well ...

  14. Daya Bay Nuclear Power Station equipment reliability management system innovation

    International Nuclear Information System (INIS)

    Gao Ligang; Wang Zongjun

    2006-01-01

    Daya Bay Nuclear Power Station has achieved good performance since its commercial operation in 1994. The equipment reliability management system that features Daya Bay characteristics has been established through constant technology introduction, digestion and innovation. It is also based on the success of operational system, equipment maintenance system and technical support system. The system lays a solid foundation for the long-term safe operation of power station. This article emphasizes on the innovation part of equipment reliability management system in Daya Bay. (authors)

  15. The reliability of nuclear power plant safety systems

    International Nuclear Information System (INIS)

    Susnik, J.

    1978-01-01

    A criterion was established concerning the protection that nuclear power plant (NPP) safety systems should afford. An estimate of the necessary or adequate reliability of the total complex of safety systems was derived. The acceptable unreliability of auxiliary safety systems is given, provided the reliability built into the specific NPP safety systems (ECCS, Containment) is to be fully utilized. A criterion for the acceptable unreliability of safety (sub)systems which occur in minimum cut sets having three or more components of the analysed fault tree was proposed. A set of input MTBF or MTTF values which fulfil all the set criteria and attain the appropriate overall reliability was derived. The sensitivity of results to input reliability data values was estimated. Numerical reliability evaluations were evaluated by the programs POTI, KOMBI and particularly URSULA, the last being based on Vesely's kinetic fault tree theory. (author)

  16. Thermal Management and Reliability of Automotive Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant V [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bennion, Kevin S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cousineau, Justine E [National Renewable Energy Laboratory (NREL), Golden, CO (United States); DeVoto, Douglas J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Feng, Xuhui [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kekelia, Bidzina [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kozak, Joseph P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Major, Joshua [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Moreno, Gilberto [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Paret, Paul P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tomerlin, Jeff J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-09

    Low-cost, high-performance thermal management technologies are helping meet aggressive power density, specific power, cost, and reliability targets for power electronics and electric machines. The National Renewable Energy Laboratory is working closely with numerous industry and research partners to help influence development of components that meet aggressive performance and cost targets through development and characterization of cooling technologies, and thermal characterization and improvements of passive stack materials and interfaces. Thermomechanical reliability and lifetime estimation models are important enablers for industry in cost-and time-effective design.

  17. Microgrids: Reliable power in a small package

    International Nuclear Information System (INIS)

    Krotz, D.

    2003-01-01

    A new approach to power generation in which a cluster of small, on-site generators serve office buildings, industrial parks and homes, is being developed by scientists at the University of California's Berkeley Campus. Called microgrid, the system may well be the answer to satisfying the growing thirst for electricity without the danger of overburdening the aging transmission lines, or building 1,000 new power plants that would be required to meet the ever-growing demand. The new approach relies on small generators such as ordinary reciprocating engines, microturbines, fuel cells, and photovoltaic systems. This microgrid of small generators appears to the main grid as just an ordinary customer. When the grid offers cheap electricity, the microgrid can purchase it, but when prices rise, or when there is a power failure, the microgrid can isolate itself, ensuring uninterrupted power to critical equipment such as computers, communications infrastructure and control systems. The idea is that if sensitive equipment can be powered locally, the vulnerable centralized power system becomes much less critical. The microgrid could be powered by recovered waste heat, a currently wasted by-product of power generation. Waste heat could also cool and dehumidify buildings using thermally activated processes. Microgrids also have the potential to introduce real competition into the electricity market by offering customers a choice; this is expected to have the effect of imposing competitive discipline on power companies. To extend the potential even farther, it is considered well within the realm of possibility that by introducing fuel cell-powered cars into the microgrid, the car could be used as a source of power by simply parking it and plugging it in to supply electricity to the home or the office

  18. Analytical modeling of nuclear power station operator reliability

    International Nuclear Information System (INIS)

    Sabri, Z.A.; Husseiny, A.A.

    1979-01-01

    The operator-plant interface is a critical component of power stations which requires the formulation of mathematical models to be applied in plant reliability analysis. The human model introduced here is based on cybernetic interactions and allows for use of available data from psychological experiments, hot and cold training and normal operation. The operator model is identified and integrated in the control and protection systems. The availability and reliability are given for different segments of the operator task and for specific periods of the operator life: namely, training, operation and vigilance or near retirement periods. The results can be easily and directly incorporated in system reliability analysis. (author)

  19. Human reliability analysis of Lingao Nuclear Power Station

    International Nuclear Information System (INIS)

    Zhang Li; Huang Shudong; Yang Hong; He Aiwu; Huang Xiangrui; Zheng Tao; Su Shengbing; Xi Haiying

    2001-01-01

    The necessity of human reliability analysis (HRA) of Lingao Nuclear Power Station are analyzed, and the method and operation procedures of HRA is briefed. One of the human factors events (HFE) is analyzed in detail and some questions of HRA are discussed. The authors present the analytical results of 61 HFEs, and make a brief introduction of HRA contribution to Lingao Nuclear Power Station

  20. Telecommunications, power supply, computer systems: the infrastructures of the soccer world cup; Telecommunications, electricite, informatique: les infrastructures de la Coupe du Monde

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1998-06-01

    The 1998 edition of the soccer world cup took place in ten different stadiums in France and several related sites. This short paper gives a general overview of the infrastructures developed for this occasion in the domains of telecommunications, power supply (substations, protection systems, computerized control systems..), and computer systems. (J.S.)

  1. Increased nuclear safety and reliability through power beaming

    International Nuclear Information System (INIS)

    Coomes, E.P.; Widrig, R.D.

    1989-01-01

    Space satellites and platforms currently include self-contained power systems to supply the energy necessary to accomplish mission objectives. With power beaming, the power system is separate from the satellite and the two are connected by an energy beam. This approach is analogous to earth-based central station power generation and distribution over transmission lines to various customers. In space, power is produced by power satellites (central power generating stations) and transmitted via energy beams to individual users. Power beaming has the ability to provide an order of magnitude increase in power availability over solar-based power systems with less mass on orbit. The technologies needed for power beaming are being developed today under existing programs directed by the Strategic Defense Initiative Office, the National Aeronautics and Space Administration, and the US Department of Energy. A space power architecture based on power beaming would greatly increase the safety and reliability of employing nuclear power in space

  2. Critical Assessment of the Foundations of Power Transmission and Distribution Reliability Metrics and Standards.

    Science.gov (United States)

    Nateghi, Roshanak; Guikema, Seth D; Wu, Yue Grace; Bruss, C Bayan

    2016-01-01

    The U.S. federal government regulates the reliability of bulk power systems, while the reliability of power distribution systems is regulated at a state level. In this article, we review the history of regulating electric service reliability and study the existing reliability metrics, indices, and standards for power transmission and distribution networks. We assess the foundations of the reliability standards and metrics, discuss how they are applied to outages caused by large exogenous disturbances such as natural disasters, and investigate whether the standards adequately internalize the impacts of these events. Our reflections shed light on how existing standards conceptualize reliability, question the basis for treating large-scale hazard-induced outages differently from normal daily outages, and discuss whether this conceptualization maps well onto customer expectations. We show that the risk indices for transmission systems used in regulating power system reliability do not adequately capture the risks that transmission systems are prone to, particularly when it comes to low-probability high-impact events. We also point out several shortcomings associated with the way in which regulators require utilities to calculate and report distribution system reliability indices. We offer several recommendations for improving the conceptualization of reliability metrics and standards. We conclude that while the approaches taken in reliability standards have made considerable advances in enhancing the reliability of power systems and may be logical from a utility perspective during normal operation, existing standards do not provide a sufficient incentive structure for the utilities to adequately ensure high levels of reliability for end-users, particularly during large-scale events. © 2015 Society for Risk Analysis.

  3. Building safeguards infrastructure

    International Nuclear Information System (INIS)

    Stevens, Rebecca S.; McClelland-Kerr, John

    2009-01-01

    Much has been written in recent years about the nuclear renaissance - the rebirth of nuclear power as a clean and safe source of electricity around the world. Those who question the nuclear renaissance often cite the risk of proliferation, accidents or an attack on a facility as concerns, all of which merit serious consideration. The integration of these three areas - sometimes referred to as 3S, for safety, security and safeguards - is essential to supporting the growth of nuclear power, and the infrastructure that supports them should be strengthened. The focus of this paper will be on the role safeguards plays in the 3S concept and how to support the development of the infrastructure necessary to support safeguards. The objective of this paper has been to provide a working definition of safeguards infrastructure, and to discuss xamples of how building safeguards infrastructure is presented in several models. The guidelines outlined in the milestones document provide a clear path for establishing both the safeguards and the related infrastructures needed to support the development of nuclear power. The model employed by the INSEP program of engaging with partner states on safeguards-related topics that are of current interest to the level of nuclear development in that state provides another way of approaching the concept of building safeguards infrastructure. The Next Generation Safeguards Initiative is yet another approach that underscored five principal areas for growth, and the United States commitment to working with partners to promote this growth both at home and abroad.

  4. Technology success: Integration of power plant reliability and effective maintenance

    International Nuclear Information System (INIS)

    Ferguson, K.

    2008-01-01

    The nuclear power generation sector has a tradition of utilizing technology as a key attribute for advancement. Companies that own, manage, and operate nuclear power plants can be expected to continue to rely on technology as a vital element of success. Inherent with the operations of the nuclear power industry in many parts of the world is the close connection between efficiency of power plant operations and successful business survival. The relationship among power plant availability, reliability of systems and components, and viability of the enterprise is more evident than ever. Technology decisions need to be accomplished that reflect business strategies, work processes, as well as needs of stakeholders and authorities. Such rigor is needed to address overarching concerns such as power plant life extension and license renewal, new plant orders, outage management, plant safety, inventory management etc. Particular to power plant reliability, the prudent leveraging of technology as a key to future success is vital. A dominant concern is effective asset management as physical plant assets age. Many plants are in, or are entering in, a situation in which systems and component design life and margins are converging such that failure threats can come into play with increasing frequency. Wisely selected technologies can be vital to the identification of emerging threats to reliable performance of key plant features and initiating effective maintenance actions and investments that can sustain or enhance current reliability in a cost effective manner. This attention to detail is vital to investment in new plants as well This paper and presentation will address (1) specific technology success in place at power plants, including nuclear, that integrates attention to attaining high plant reliability and effective maintenance actions as well as (2) complimentary actions that maximize technology success. In addition, the range of benefits that accrue as a result of

  5. Reliability Concerns for Flying SiC Power MOSFETs in Space

    Science.gov (United States)

    Galloway, K. F.; Witulski, A. F.; Schrimpf, R. D.; Sternberg, A. L.; Ball, D. R.; Javanainen, A.; Reed, R. A.; Sierawski, B. D.; Lauenstein, J-M

    2018-01-01

    SiC power MOSFETs are space-ready in terms of typical reliability measures. However, single event burnout (SEB) often occurs at voltages 50% or lower than specified breakdown. Data illustrating burnout for 1200 V devices is reviewed and the space reliability of SiC MOSFETs is discussed.

  6. Building safeguards infrastructure

    International Nuclear Information System (INIS)

    McClelland-Kerr, J.; Stevens, J.

    2010-01-01

    Much has been written in recent years about the nuclear renaissance - the rebirth of nuclear power as a clean and safe source of electricity around the world. Those who question the nuclear renaissance often cite the risk of proliferation, accidents or an attack on a facility as concerns, all of which merit serious consideration. The integration of three areas - sometimes referred to as 3S, for safety, security and safeguards - is essential to supporting the clean and safe growth of nuclear power, and the infrastructure that supports these three areas should be robust. The focus of this paper will be on the development of the infrastructure necessary to support safeguards, and the integration of safeguards infrastructure with other elements critical to ensuring nuclear energy security

  7. Development of nuclear power plant management system for Kyushu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Nakamura, Kenichi; Akiyoshi, Tatsuo; Tanimoto, Kazuo; Ogura, Kazuhito; Ibi, Yuji; Kawasaki, Michiyuki

    2002-01-01

    The Kyushu Electric Power Co., Ltd. progresses development of the nuclear power plant management system using IT under aims at upgrading of efficiency, level, and reliability on maintenance and administration business under five years planning since 1999 fiscal year. The outline of the system are explained in this paper. As a result of preparation on power station net work and personal computers set in all of company, an environment capable of using these infrastructures and introducing large scale systems on transverse business over every groups of each power station could be established. (G.K.)

  8. Reliability Oriented Circuit Design For Power Electronics Applications

    DEFF Research Database (Denmark)

    Sintamarean, Nicolae Cristian

    is presented. Chapter 3 presents the electro-thermal model validation and the reliability studies performed by the proposed tool. The chapter ends with a detailed lifetime analysis, which emphasizes the mission-profile variation and gate-driver parameters variation impact on the PV-inverter devices lifetime......Highly reliable components are required in order to minimize the downtime during the lifetime of the converter and implicitly the maintenance costs. Therefore, the design of high reliable converters under constrained reliability and cost is a great challenge to be overcome in the future....... Moreover, the impact of the mission-profile sampling time on the lifetime estimation accuracy is also determined. The second part of the thesis introduced in Chapter 4, presents a novel gate-driver concept which reduces the dependency of the device power losses variations on the device loading variations...

  9. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  10. Power Line Communications for Smart Grid Applications

    Directory of Open Access Journals (Sweden)

    Lars Torsten Berger

    2013-01-01

    Full Text Available Power line communication, that is, using the electricity infrastructure for data transmission, is experiencing a renaissance in the context of Smart Grid. Smart Grid objectives include the integration of intermittent renewable energy sources into the electricity supply chain, securing reliable electricity delivery, and using the existing electrical infrastructure more efficiently. This paper surveys power line communications (PLCs in the context of Smart Grid. The specifications G3-PLC, PRIME, HomePlug Green PHY, and HomePlug AV2, and the standards IEEE 1901/1901.2 and ITU-T G.hn/G.hnem are discussed.

  11. Power system reliability impacts of wind generation and operational reserve requirements

    Directory of Open Access Journals (Sweden)

    Esteban Gil

    2015-06-01

    Full Text Available Due to its variability, wind generation integration presents a significant challenge to power system operators in order to maintain adequate reliability levels while ensuring least cost operation. This paper explores the trade-off between the benefits associated to a higher wind penetration and the additional operational reserve requirements that they impose. Such exploration is valued in terms of its effect on power system reliability, measured as an amount of unserved energy. The paper also focuses on how changing the Value of Lost Load (VoLL can be used to attain different reliability targets, and how wind power penetration and the diversity of the wind energy resource will impact quality of supply (in terms of instances of unserved energy. The evaluation of different penetrations of wind power generation, different wind speed profiles, wind resource diversity, and different operational reserve requirements, is conducted on the Chilean Northern Interconnected System (SING using statistical modeling of wind speed time series and computer simulation through a 24-hour ahead unit commitment algorithm and a Monte Carlo simulation scheme. Results for the SING suggest that while wind generation can significantly reduce generation costs, it can also imply higher security costs to reach acceptable reliability levels.

  12. Cyberwarfare on the Electricity Infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Murarka, N.; Ramesh, V.C.

    2000-03-20

    The report analyzes the possibility of cyberwarfare on the electricity infrastructure. The ongoing deregulation of the electricity industry makes the power grid all the more vulnerable to cyber attacks. The report models the power system information system components, models potential threats and protective measures. It therefore offers a framework for infrastructure protection.

  13. A Survey on the Reliability of Power Electronics in Electro-Mobility Applications

    DEFF Research Database (Denmark)

    Gadalla, Brwene Salah Abdelkarim; Schaltz, Erik; Blaabjerg, Frede

    2015-01-01

    Reliability is an important issue in the field of power electronics since most of the electrical energy is today processed by power electronics. In most of the electro-mobility applications, e.g. electric and hybridelectric vehicles, power electronic are commonly used in very harsh environment...... and extending the service lifetime as well. Research within power electronics is of high interest as it has an important impact in the industry of the electro-mobility applications. According to the aforementioned explanations, this paper will provide an overview of the common factors (thermal cycles, power...... cycles, vibrations, voltage stress and current ripple stress) affecting the reliability of power electronics in electromobility applications. Also, the researchers perspective is summarized from 2001 to 2015....

  14. Stochastic models and reliability parameter estimation applicable to nuclear power plant safety

    International Nuclear Information System (INIS)

    Mitra, S.P.

    1979-01-01

    A set of stochastic models and related estimation schemes for reliability parameters are developed. The models are applicable for evaluating reliability of nuclear power plant systems. Reliability information is extracted from model parameters which are estimated from the type and nature of failure data that is generally available or could be compiled in nuclear power plants. Principally, two aspects of nuclear power plant reliability have been investigated: (1) The statistical treatment of inplant component and system failure data; (2) The analysis and evaluation of common mode failures. The model inputs are failure data which have been classified as either the time type of failure data or the demand type of failure data. Failures of components and systems in nuclear power plant are, in general, rare events.This gives rise to sparse failure data. Estimation schemes for treating sparse data, whenever necessary, have been considered. The following five problems have been studied: 1) Distribution of sparse failure rate component data. 2) Failure rate inference and reliability prediction from time type of failure data. 3) Analyses of demand type of failure data. 4) Common mode failure model applicable to time type of failure data. 5) Estimation of common mode failures from 'near-miss' demand type of failure data

  15. Reliability Models Applied to a System of Power Converters in Particle Accelerators

    OpenAIRE

    Siemaszko, D; Speiser, M; Pittet, S

    2012-01-01

    Several reliability models are studied when applied to a power system containing a large number of power converters. A methodology is proposed and illustrated in the case study of a novel linear particle accelerator designed for reaching high energies. The proposed methods result in the prediction of both reliability and availability of the considered system for optimisation purposes.

  16. R&D program benefits estimation: DOE Office of Electricity Delivery and Energy Reliability

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-12-04

    The overall mission of the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE) is to lead national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. In support of this mission, OE conducts a portfolio of research and development (R&D) activities to advance technologies to enhance electric power delivery. Multiple benefits are anticipated to result from the deployment of these technologies, including higher quality and more reliable power, energy savings, and lower cost electricity. In addition, OE engages State and local government decision-makers and the private sector to address issues related to the reliability and security of the grid, including responding to national emergencies that affect energy delivery. The OE R&D activities are comprised of four R&D lines: High Temperature Superconductivity (HTS), Visualization and Controls (V&C), Energy Storage and Power Electronics (ES&PE), and Distributed Systems Integration (DSI).

  17. Operation and planning of coordinated natural gas and electricity infrastructures

    Science.gov (United States)

    Zhang, Xiaping

    reliability. With the growing reliance on natural gas and widespread utilization of highly efficient combined heat and power (CHP), it is also questionable that whether the independent design of infrastructures can meet potential challenges of future energy supply. To address this issue, this thesis proposed an optimization framework for a sustainable multiple energy system expansion planning based on an energy hub model while considering the energy efficiency, emission and reliability performance. In addition, we introduced the probabilistic reliability evaluation and flow network analysis into the multiple energy system design in order to obtain an optimal and reliable network topology.

  18. Nodal price volatility reduction and reliability enhancement of restructured power systems considering demand-price elasticity

    International Nuclear Information System (INIS)

    Goel, L.; Wu, Qiuwei; Wang, Peng

    2008-01-01

    With the development of restructured power systems, the conventional 'same for all customers' electricity price is getting replaced by nodal prices. Electricity prices will fluctuate with time and nodes. In restructured power systems, electricity demands will interact mutually with prices. Customers may shift some of their electricity consumption from time slots of high electricity prices to those of low electricity prices if there is a commensurate price incentive. The demand side load shift will influence nodal prices in return. This interaction between demand and price can be depicted using demand-price elasticity. This paper proposes an evaluation technique incorporating the impact of the demand-price elasticity on nodal prices, system reliability and nodal reliabilities of restructured power systems. In this technique, demand and price correlations are represented using the demand-price elasticity matrix which consists of self/cross-elasticity coefficients. Nodal prices are determined using optimal power flow (OPF). The OPF and customer damage functions (CDFs) are combined in the proposed reliability evaluation technique to assess the reliability enhancement of restructured power systems considering demand-price elasticity. The IEEE reliability test system (RTS) is simulated to illustrate the developed techniques. The simulation results show that demand-price elasticity reduces the nodal price volatility and improves both the system reliability and nodal reliabilities of restructured power systems. Demand-price elasticity can therefore be utilized as a possible efficient tool to reduce price volatility and to enhance the reliability of restructured power systems. (author)

  19. Determining the reliability function of the thermal power system in power plant "Nikola Tesla, Block B1"

    Directory of Open Access Journals (Sweden)

    Kalaba Dragan V.

    2015-01-01

    Full Text Available Representation of probabilistic technique for evaluation of thermal power system reliability is the main subject of this paper. The system of thermal power plant under study consists of three subsystems and the reliability assessment is based on a sixteen-year failure database. By applying the mathematical theory of reliability to exploitation research data and using complex two-parameter Weibull distribution, the theoretical reliability functions of specified system have been determined. Obtained probabilistic laws of failure occurrence have confirmed a hypothesis that the distribution of the observed random variable fully describes behaviour of such a system in terms of reliability. Shown results make possible to acquire a better knowledge of current state of the system, as well as a more accurate estimation of its behavior during future exploitation. Final benefit is opportunity for potential improvement of complex system maintenance policies aimed at the reduction of unexpected failure occurrences.

  20. Reliability of IGBT-based power devices in the viewpoint of applications in future power supply systems

    International Nuclear Information System (INIS)

    Lutz, J.

    2011-01-01

    IGBT-based high-voltage power devices will be key components for future renewable energy base of the society. Windmills in the range up to 10 MW use converters with IGBTs. HVDC systems with IGBT-based voltage source converters have the advantage of a lower level of harmonics, less efforts for filters and more possibilities for control. The power devices need a lifetime expectation of several ten years. The lifetime is determined by the reliability of the packaging technology. IGBTs are offered packaged in presspacks and modules. The presentation will have the focus on IGBT high power modules. Accelerated power cycling tests for to determine the end-of-life at given conditions and their results are shown. models to calculate the lifetime, and actual work in research for systems with increased reliability.

  1. Junction Temperature Control for More Reliable Power Electronics

    DEFF Research Database (Denmark)

    Andresen, Markus; Ma, Ke; Buticchi, Giampaolo

    2018-01-01

    The thermal stress of power electronic components is one of the most important causes of their failure. Proper thermal management plays an important role for more reliable and cost-effective energy conversion. As one of the most vulnerable and expensive components, power semiconductor components ...... the desired cost-benefit tradeoff. This paper analyzes also the many open questions of this research area. Among them, it is worth highlighting that a verification of the actual lifetime extension is still missing....

  2. Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques

    International Nuclear Information System (INIS)

    Ding, Yi; Wang, Peng; Goel, Lalit; Billinton, Roy; Karki, Rajesh

    2007-01-01

    This paper presents a technique to evaluate reliability of a restructured power system with a bilateral market. The proposed technique is based on the combination of the reliability network equivalent and pseudo-sequential simulation approaches. The reliability network equivalent techniques have been implemented in the Monte Carlo simulation procedure to reduce the computational burden of the analysis. Pseudo-sequential simulation has been used to increase the computational efficiency of the non-sequential simulation method and to model the chronological aspects of market trading and system operation. Multi-state Markov models for generation and transmission systems are proposed and implemented in the simulation. A new load shedding scheme is proposed during generation inadequacy and network congestion to minimize the load curtailment. The IEEE reliability test system (RTS) is used to illustrate the technique. (author)

  3. Determination of the Level of Influence of Various Factors on the Reliability of Power System

    Directory of Open Access Journals (Sweden)

    Victor Popescu

    2014-09-01

    Full Text Available Consumers supply with qualitative electric power is one of the priority requirements imposed to power systems. Currently, in electricity networks take place a number of planned and unplanned disconnections, which interrupt the power and affect consumers, causing economic damage. To ensure the quality of power supply it is essential to know the factors that influence the reliability of power systems, which have a visible impact on the variation of reliability of equipment installed in power systems. This paper is devoted to problems of calculation and analysis of power systems reliability and estimation of the impact of various factors that influence the supply of consumers.

  4. Reliability of emergency alternating-current power systems at nuclear power plants: a discussion of NUREG/CR-2989

    International Nuclear Information System (INIS)

    Battle, R.E.

    1985-01-01

    The reliability of emergency alternating-current power systems typical of most nuclear power plants was estimated by using fault-tree analysis of selected typical designs. The failure probabilities used in the fault trees were calculated from extensive historical data collected from Licensee Event Reports and from operating experience information obtained from nuclear plant licensees. Trends of diesel generator independent failure on demand are included. No one or two improvements can be made at all plants to increase significantly the industry-average emergency alternating-current power system reliability; the most beneficial improvements are varied and plant specific

  5. Power quality and reliability issues in a deregulated energy market

    International Nuclear Information System (INIS)

    Huggins, M.J.

    1999-01-01

    The challenge of maintaining power quality and reliability in Ontario's new competitive electricity market was the focus of this paper. The intention of Ontario's deregulation is to lower costs and give customers more power and choice. However, some fear that costs pressures may lead to poorer quality. This paper reviewed the causes, costs, and responsibilities, and made some suggestions concerning how customers can protect their interests as the market opens. It was suggested that in order to assure power quality, especially during the transition period, customers need to take care to design their systems and equipment to tolerate some quality variations. Conversely, utilities need to strive for at least minimum industry standards under most conditions. Contracts should be carefully crafted, with responsibilities for reliability and quality clearly stated. 2 refs

  6. Future of structural reliability methodology in nuclear power plant technology

    Energy Technology Data Exchange (ETDEWEB)

    Schueeller, G I [Technische Univ. Muenchen (Germany, F.R.); Kafka, P [Gesellschaft fuer Reaktorsicherheit m.b.H. (GRS), Garching (Germany, F.R.)

    1978-10-01

    This paper presents the authors' personal view as to which areas of structural reliability in nuclear power plant design need most urgently to be advanced. Aspects of simulation modeling, design rules, codification and specification of reliability, system analysis, probabilistic structural dynamics, rare events and particularly the interaction of systems and structural reliability are discussed. As an example, some considerations of the interaction effects between the protective systems and the pressure vessel are stated. The paper concludes with recommendation for further research.

  7. The establish and application of equipment reliability database in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zheng Wei; Li He

    2006-03-01

    Take the case of Daya Bay Nuclear Power Plant, the collecting and handling of equipment reliability data, the calculation method of reliability parameters and the establish and application of reliability databases, etc. are discussed. The data source involved the design information of the equipment, the operation information, the maintenance information and periodically test record, etc. Equipment reliability database built on a base of the operation experience. It provided the valid tool for thoroughly and objectively recording the operation history and the present condition of various equipment of the plant; supervising the appearance of the equipment, especially the safety-related equipment, provided the very practical worth information for enhancing the safety and availability management of the equipment and insuring the safety and economic operation of the plant; and provided the essential data for the research and applications in safety management, reliability analysis, probabilistic safety assessment, reliability centered maintenance and economic management in nuclear power plant. (authors)

  8. Determining the theoretical reliability function of thermal power system using simple and complex Weibull distribution

    Directory of Open Access Journals (Sweden)

    Kalaba Dragan V.

    2014-01-01

    Full Text Available The main subject of this paper is the representation of the probabilistic technique for thermal power system reliability assessment. Exploitation research of the reliability of the fossil fuel power plant system has defined the function, or the probabilistic law, according to which the random variable behaves (occurrence of complete unplanned standstill. Based on these data, and by applying the reliability theory to this particular system, using simple and complex Weibull distribution, a hypothesis has been confirmed that the distribution of the observed random variable fully describes the behaviour of such a system in terms of reliability. Establishing a comprehensive insight in the field of probabilistic power system reliability assessment technique could serve as an input for further research and development in the area of power system planning and operation.

  9. Improvement of infrastructure for risk-informed regulation

    International Nuclear Information System (INIS)

    Muta, Hitoshi; Tanji, Junichi; Kondo, Keisuke; Uchida, Tsuyoshi; Ito, Tomomichi

    2011-01-01

    Improvement of the infrastructure of probabilistic safety assessment (PSA) is essential to the risk-informed regulation for nuclear power plants. JNES conducted update of initiating event frequency and improvement of method for uncertainty analysis to enhance the technology bases of PSA in 2010. Furthermore, JNES improved human reliability assessment method and reliability assessment method for digital reactor protection systems. JNES estimated initiating event frequencies both for power and shutdown operation based on the recent operating experiences in NPPs of Japan using hierarchical Bayesian method. As for improvement of uncertainty analysis method, JNES conducted trial analysis using SOKC (State-Of-Knowledge Correlation) for representative PWR and BWR of Japan. The study on the advanced HRA method with operator cognitive action model was conducted. The study on reliability analysis method for digital reactor protection systems using Bayesian Network Method was conducted. In order to ensure the quality of PSA, JNES studied requirements and methods for PSA peer review via the preparation of peer review for PSA of a representative Japanese BWR plant conducted by JNES. As an effort to develop the procedures of internal fire PSA and internal flooding PSA, trial analyses were conducted to grasp the risk level cause by fire and flooding in nuclear power plants. JNES participated in OECD/NEA PRISME and FIRE project to obtain the latest information and data to validate and improve the fire propagation analysis codes and the parameters for fire PSA. Furthermore, JNES studies schemes for endorsement and application in risk-informed regulation of PSA standards established by Atomic Energy Society of Japan. (author)

  10. Telecom infrastructure leasing

    International Nuclear Information System (INIS)

    Henley, R.

    1995-01-01

    Slides to accompany a discussion about leasing telecommunications infrastructure, including radio/microwave tower space, radio control buildings, paging systems and communications circuits, were presented. The structure of Alberta Power Limited was described within the ATCO group of companies. Corporate goals and management practices and priorities were summarized. Lessons and experiences in the infrastructure leasing business were reviewed

  11. Forward reliability markets: Less risk, less market power, more efficiency

    International Nuclear Information System (INIS)

    Cramton, Peter; Stoft, Steven

    2008-01-01

    A forward reliability market is presented. The market coordinates new entry through the forward procurement of reliability options - physical capacity bundled with a financial option to supply energy above a strike price. The market assures adequate generating resources and prices capacity from the bids of competitive new entry in an annual auction. Efficient performance incentives are maintained from a load-following obligation to supply energy above the strike price. The capacity payment fully hedges load from high spot prices, and reduces supplier risk as well. Market power is reduced in the spot market, since suppliers enter the spot market with a nearly balanced position in times of scarcity. Market power in the reliability market is addressed by not allowing existing supply to impact the capacity price. The approach, which has been adopted in New England and Colombia, is readily adapted to either a thermal system or a hydro system. (author)

  12. The Evaluation Method of the Lightning Strike on Transmission Lines Aiming at Power Grid Reliability

    Science.gov (United States)

    Wen, Jianfeng; Wu, Jianwei; Huang, Liandong; Geng, Yinan; Yu, zhanqing

    2018-01-01

    Lightning protection of power system focuses on reducing the flashover rate, only distinguishing by the voltage level, without considering the functional differences between the transmission lines, and being lack of analysis the effect on the reliability of power grid. This will lead lightning protection design of general transmission lines is surplus but insufficient for key lines. In order to solve this problem, the analysis method of lightning striking on transmission lines for power grid reliability is given. Full wave process theory is used to analyze the lightning back striking; the leader propagation model is used to describe the process of shielding failure of transmission lines. The index of power grid reliability is introduced and the effect of transmission line fault on the reliability of power system is discussed in detail.

  13. Impact of multilateral congestion management on the reliability of power transactions

    International Nuclear Information System (INIS)

    Rodrigues, A.B.; Da Silva, M.G.

    2003-01-01

    The restructuring of the electricity industry has caused an increase in the number of transactions in the energy market. These transactions are defined by market forces without considering operational constraints of the transmission system. Consequently, there are transactions that cause congestion in the transmission network. This paper has as objective to assess the impact of multilateral congestion management on the reliability of power transactions. This assessment is based on reliability indices such as expected power curtailments, curtailment probability, expected cost of congestion management and probability distributions of the total power curtailment. Tests results with IEEE RTS-1996 demonstrate that the multilateral management results in smaller curtailments and congestion costs than traditional bilateral management. (author)

  14. 76 FR 64082 - Mandatory Reliability Standards for the Bulk-Power System; Notice of Staff Meeting

    Science.gov (United States)

    2011-10-17

    ... Reliability Standards for the Bulk-Power System; Notice of Staff Meeting Take notice that the Federal Energy... R1.3.10 of Commission-approved transmission planning Reliability Standard TPL-002- 0 (System... additional actions necessary to address the matter.\\3\\ \\1\\ Mandatory Reliability Standards for the Bulk-Power...

  15. Site development and demands on infrastructure

    International Nuclear Information System (INIS)

    Nieke, K.F.

    1976-01-01

    All sub-fields are examined which form the infrastructure, the infrastructure being indispensable for the site development of a nuclear power plant. The main emphasis is put on the technical infrastructure, but the social infrastructure is dealt with, too. The most important sub-fields are: traffic connections, energy supply, external communications, foundation, building mearures. (UA) [de

  16. Enhancing reliability of ultrasonic testing of welds of nuclear power plant equipment

    International Nuclear Information System (INIS)

    Shcherbinskij, V.G.

    1981-01-01

    Results of investigation of factors influencing the reliability of manual ultrasonic testing of welded joints and weld deposited metal power-generating equipment are presented. Recommendations on the enhancing of reliability are given [ru

  17. Cost recovery of congested infrastructure under market power

    NARCIS (Netherlands)

    Verhoef, Erik T.

    2017-01-01

    The Mohring–Harwitz (1962) theorem states that the degree of self-financing of congested infrastructure is equal to the elasticity of the capacity cost function in the optimum, so that under neutral scale economies exact self-financing applies. The theorem breaks down when the infrastructure is used

  18. Beliefs concerning the reliability of nuclear power plant in-service inspections

    International Nuclear Information System (INIS)

    Kettunen, J.

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials' beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees' own justification. (refs.)

  19. Control Strategies for Improving Energy Efficiency and Reliability in Autonomous Microgrids with Communication Constraints

    Directory of Open Access Journals (Sweden)

    Francisco Martins Portelinha Júnior

    2017-09-01

    Full Text Available Microgrids are a feasible path to deploy smart grids, an intelligent and highly automated power system. Their operation demands a dedicated communication infrastructure to manage, control and monitor the intermittent sources of energy and loads. Therefore, smart devices will be connected to support the growth of grid smartness increasing the dependency on communication networks, which consumes a high amount of power. In an energy-limited scenario, one of the main issues is to enhance the power supply time. Therefore, this paper proposes a hybrid methodology for microgrid energy management, integrated with a communication infrastructure to improve and to optimize islanded microgrid operation at maximum energy efficiency. The hybrid methodology applies some control management rules, such as intentional load shedding, priority load management, and communication energy saving. These energy saving rules establish a trade-off between increasing microgrid energy availability and communication system reliability. To achieve a compromised solution, a continuous time Markov chain model describes the impact of energy saving policies into system reliability. The proposed methodology is simulated and tested with the help of the modified IEEE 34 node test-system.

  20. Application of safety and reliability approaches in the power sector: Inside-sectoral overview

    DEFF Research Database (Denmark)

    Kozine, Igor

    2010-01-01

    This chapter summarizes the state-of-the-art and state-of-practice on the applications of safety and reliability approaches in the Power Sector. The nature and composition of this industrial sector including the characteristics of major hazards are summarized. The present situation with regard...... to a number of key technical aspects involved in the use of safety and reliability approaches in the power sector is discussed. Based on this review a Technology Maturity Matrix is synthesized. Barriers to the wider use of risk and reliability methods in the design and operation of power installations...... are identified and possible ways of overcoming these barriers are suggested. Key issues and priorities for research are identified....

  1. Reliability analysis of HVDC grid combined with power flow simulations

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Yongtao; Langeland, Tore; Solvik, Johan [DNV AS, Hoevik (Norway); Stewart, Emma [DNV KEMA, Camino Ramon, CA (United States)

    2012-07-01

    Based on a DC grid power flow solver and the proposed GEIR, we carried out reliability analysis for a HVDC grid test system proposed by CIGRE working group B4-58, where the failure statistics are collected from literature survey. The proposed methodology is used to evaluate the impact of converter configuration on the overall reliability performance of the HVDC grid, where the symmetrical monopole configuration is compared with the bipole with metallic return wire configuration. The results quantify the improvement on reliability by using the later alternative. (orig.)

  2. Designing reliable wireless sensor network for nuclear power plant

    International Nuclear Information System (INIS)

    Fujiwara, Takeshi; Takahashi, Hiroyuki

    2007-01-01

    This study proposes an innovative method for the monitoring the nuclear power plant. In this field, false detection of the trouble, both 'false negative' and 'false positive' will become a serious problem. In the other hand, since nuclear power plant is such a complicated system, wireless is required for implementing into real field. Considering these backgrounds, we propose a new reliable health monitoring system for nuclear power plant. This is based on an idea, 'a network on a network', such as 'wireless global network' on 'local network with self-maintenance function.' (author)

  3. Application of GO methodology in reliability analysis of offsite power supply of Daya Bay NPP

    International Nuclear Information System (INIS)

    Shen Zupei; Li Xiaodong; Huang Xiangrui

    2003-01-01

    The author applies the GO methodology to reliability analysis of the offsite power supply system of Daya Bay NPP. The direct quantitative calculation formulas of the stable reliability target of the system with shared signals and the dynamic calculation formulas of the state probability for the unit with two states are derived. The method to solve the fault event sets of the system is also presented and all the fault event sets of the outer power supply system and their failure probability are obtained. The resumption reliability of the offsite power supply system after the stability failure of the power net is also calculated. The result shows that the GO methodology is very simple and useful in the stable and dynamic reliability analysis of the repairable system

  4. Business Models for Solar Powered Charging Stations to Develop Infrastructure for Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Jessica Robinson

    2014-10-01

    Full Text Available Electric power must become less dependent on fossil fuels and transportation must become more electric to decrease carbon emissions and mitigate climate change. Increasing availability and accessibility of charging stations is predicted to increase purchases of electric vehicles. In order to address the current inadequate charging infrastructure for electric vehicles, major entities must adopt business models for solar powered charging stations (SPCS. These SPCS should be located in parking lots to produce electricity for the grid and provide an integrated infrastructure for charging electric vehicles. Due to the lack of information related to SPCS business models, this manuscript designs several models for major entities including industry, the federal and state government, utilities, universities, and public parking. A literature review of the available relevant business models and case studies of constructed charging stations was completed to support the proposals. In addition, a survey of a university’s students, staff, and faculty was conducted to provide consumer research on people’s opinion of SPCS construction and preference of business model aspects. Results showed that 69% of respondents would be more willing to invest in an electric vehicle if there was sufficient charging station infrastructure at the university. Among many recommendations, the business models suggest installing level 1 charging for the majority of entities, and to match entities’ current pricing structures for station use. The manuscript discusses the impacts of fossil fuel use, and the benefits of electric car and SPCS use, accommodates for the present gap in available literature on SPCS business models, and provides current consumer data for SPCS and the models proposed.

  5. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    Science.gov (United States)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  6. Energy efficiency and demand respond programs play vital roles in short- and long-term system reliability

    Energy Technology Data Exchange (ETDEWEB)

    Mitola, J. P.

    2003-12-01

    The effects of deregulation of the electric power industry on the reliability of the power grid in the United States are examined. Three major factors -- customer load, utility infrastructure, and demand response -- together are suggested as being most important; the ability of the industry to maintain the equilibrium among these three factors will determine the success or failure of deregulation. Each of these factors are examined in turn, followed by recommendations encouraging demand response or energy efficiency innovations, particularly new demand response technologies that are reliable, measurable, competitive to end-users, and fully dispatchable to utilities.

  7. 76 FR 10583 - Priorities for Addressing Risks to the Reliability of the Bulk-Power System; Notice Establishing...

    Science.gov (United States)

    2011-02-25

    ... Addressing Risks to the Reliability of the Bulk- Power System; Notice Establishing Date for Comments On... regarding priorities for addressing risks to the reliability of the Bulk-Power System, as previously... Bulk-Power System, 76 FR 2369 (January 13, 2011), as supplemented by the Reliability Technical...

  8. Design for High Performance, Low Power, and Reliable 3D Integrated Circuits

    CERN Document Server

    Lim, Sung Kyu

    2013-01-01

    This book describes the design of through-silicon-via (TSV) based three-dimensional integrated circuits.  It includes details of numerous “manufacturing-ready” GDSII-level layouts of TSV-based 3D ICs, developed with tools covered in the book. Readers will benefit from the sign-off level analysis of timing, power, signal integrity, and thermo-mechanical reliability for 3D IC designs.  Coverage also includes various design-for-manufacturability (DFM), design-for-reliability (DFR), and design-for-testability (DFT) techniques that are considered critical to the 3D IC design process. Describes design issues and solutions for high performance and low power 3D ICs, such as the pros/cons of regular and irregular placement of TSVs, Steiner routing, buffer insertion, low power 3D clock routing, power delivery network design and clock design for pre-bond testability. Discusses topics in design-for-electrical-reliability for 3D ICs, such as TSV-to-TSV coupling, current crowding at the wire-to-TSV junction and the e...

  9. Nuclear power - international and national dimensions

    International Nuclear Information System (INIS)

    Yanev, Ya.

    1994-01-01

    A strong internationalization of nuclear problems is observed recently. International links have acted as a powerful force for improvement of safety standards and plant performance. The prospects for nuclear industry, its safety and excellent operation, its acceptance and tolerance from society in general will strongly influence the future of nuclear power generation in Bulgaria. The most important problems of Bulgarian nuclear energy are: implementation of safety upgrading program; building and operating new nuclear units; developing infrastructure which will permit safe and reliable operation of the existing units and solve the fuel cycle problems in a reliable and acceptable by the society manner. (I.P.)

  10. Cyber security in nuclear power plants and its portability to other industrial infrastructures

    International Nuclear Information System (INIS)

    Champigny, Sebastien; Gupta, Deeksha; Watson, Venesa; Waedt, Karl

    2017-01-01

    Power generation increasingly relies on decentralised and interconnected computerised systems. Concepts like ''Industrial Internet of Things'' of the Industrial Internet Consortium (IIC), and ''Industry 4.0'' find their way in this strategic industry. Risk of targeted exploits of errors and vulnerabilities increases with complexity, interconnectivity and decentralization. Inherently stringent security requirements and features make nuclear computerised applications and systems a benchmark for industrial counterparts seeking to hedge against those risks. Consequently, this contribution presents usual cyber security regulations and practices for nuclear power plants. It shows how nuclear cyber security can be ported and used in an industrial context to protect critical infrastructures against cyber-attacks and industrial espionage.

  11. Advanced simulation for analysis of critical infrastructure : abstract cascades, the electric power grid, and Fedwire.

    Energy Technology Data Exchange (ETDEWEB)

    Glass, Robert John, Jr.; Stamber, Kevin Louis; Beyeler, Walter Eugene

    2004-08-01

    Critical Infrastructures are formed by a large number of components that interact within complex networks. As a rule, infrastructures contain strong feedbacks either explicitly through the action of hardware/software control, or implicitly through the action/reaction of people. Individual infrastructures influence others and grow, adapt, and thus evolve in response to their multifaceted physical, economic, cultural, and political environments. Simply put, critical infrastructures are complex adaptive systems. In the Advanced Modeling and Techniques Investigations (AMTI) subgroup of the National Infrastructure Simulation and Analysis Center (NISAC), we are studying infrastructures as complex adaptive systems. In one of AMTI's efforts, we are focusing on cascading failure as can occur with devastating results within and between infrastructures. Over the past year we have synthesized and extended the large variety of abstract cascade models developed in the field of complexity science and have started to apply them to specific infrastructures that might experience cascading failure. In this report we introduce our comprehensive model, Polynet, which simulates cascading failure over a wide range of network topologies, interaction rules, and adaptive responses as well as multiple interacting and growing networks. We first demonstrate Polynet for the classical Bac, Tang, and Wiesenfeld or BTW sand-pile in several network topologies. We then apply Polynet to two very different critical infrastructures: the high voltage electric power transmission system which relays electricity from generators to groups of distribution-level consumers, and Fedwire which is a Federal Reserve service for sending large-value payments between banks and other large financial institutions. For these two applications, we tailor interaction rules to represent appropriate unit behavior and consider the influence of random transactions within two stylized networks: a regular homogeneous array

  12. ANALYSIS OF POWER SYSTEM RELIABILITY IMPROVEMENT FOR 74-BUS RADIAL DISTRIBUTION SYSTEM

    OpenAIRE

    Su Mon Myint*

    2018-01-01

    In Myanmar, electric power system planning is widely constructed because of more and more load growth and facing with failure of electricity, outage problems and system shut-down. Thus, not only making new power system network but also improving reliability of the existing system using suitable methods is very important to provide an adequate supply of electrical energy to its customers as economically and reliably as possible with an acceptable degree of continuity and quality that is design...

  13. Potential for deserts to supply reliable renewable electric power

    Science.gov (United States)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  14. Availability and Reliability of Disaster Early Warning Systems and the IT Infrastructure Library

    Science.gov (United States)

    Wächter, J.; Loewe, P.

    2012-12-01

    The Boxing Day Tsunami of 2004 caused an information catastrophy. Crucial early warning information could not be delivered to the communities under imminent threat, resulting in over 240,000 casualties in 14 countries. This tragedy sparked the development of a new generation of integrated modular Tsunami Early Warning Systems (TEWS). While significant advances were accomplished in the past years, recent events, like the Chile 2010 and the Tohoku 2011 tsunami demonstrate that the key technical challenge for Tsunami Early Warning research on the supranational scale still lies in the timely issuing of status information and reliable early warning messages. A key challenge stems from the main objective of the IOC Tsunami Programme, the integration of national TEWS towards ocean-wide networks: Each of the increasing number of integrated Tsunami Early Warning Centres has to cope with the continuing evolution of sensors, hardware and software while having to maintain reliable inter-center information exchange services. To avoid future information catastrophes, the performance of all components, ranging from sensors to Warning Centers, has to be regularly validated against defined criteria. This task is complicated by the fact that in term of ICT system life cycles tsunami are very rare event resulting in very difficult framing conditions to safeguard the availability and reliability of TWS. Since 2004, GFZ German Research Centre for Geosciences (GFZ) has built up expertise in the field of TEWS. Within GFZ, the Centre for GeoInformation Technology (CEGIT) has focused its work on the geoinformatics aspects of TEWS in two projects already: The German Indonesian Tsunami Early Warning System (GITEWS) funded by the German Federal Ministry of Education and Research (BMBF) and the Distant Early Warning System (DEWS), a European project funded under the sixth Framework Programme (FP6). These developments are continued in the TRIDEC project (Collaborative, Complex, and Critical

  15. Integrating software reliability concepts into risk and reliability modeling of digital instrumentation and control systems used in nuclear power plants

    International Nuclear Information System (INIS)

    Arndt, S. A.

    2006-01-01

    As software-based digital systems are becoming more and more common in all aspects of industrial process control, including the nuclear power industry, it is vital that the current state of the art in quality, reliability, and safety analysis be advanced to support the quantitative review of these systems. Several research groups throughout the world are working on the development and assessment of software-based digital system reliability methods and their applications in the nuclear power, aerospace, transportation, and defense industries. However, these groups are hampered by the fact that software experts and probabilistic safety assessment experts view reliability engineering very differently. This paper discusses the characteristics of a common vocabulary and modeling framework. (authors)

  16. Relationship between competitive power markets and grid reliability : the PJM RTO experience

    Energy Technology Data Exchange (ETDEWEB)

    Harris, P.G. [PJM Interconnection LLC, Philadelphia, PA (United States)

    2005-07-01

    PJM is one of the largest grid operators in North America, serving 51 million people. This white paper examined the causes of the 2003 blackout in relation to grid management tools, operator training and system planning and analysis. The aim of the paper was to explain how competition and regional transmission offices (RTOs) are addressing these issues and doing more to help improve reliability and strengthen the grid. It was suggested that consumer savings can be achieved while enhancing, rather than diminishing the reliability and security of the electricity system. Changes in the electricity industry were reviewed. Issues concerning the lack of data to measure grid reliability were discussed. It was suggested that key influences on grid reliability are regional dispatch and scheduling practices, as well as RTO coordination and system operator training. Security constrained unit commitment was discussed, as well as various new technologies to improve reliability, including real-time contingency analysis and generation dispatch; real time voltage analysis; and visualization technology. Applications scales and scopes were discussed, as well as issues concerning RTO coordination. Issues concerning enhanced operator information through data transfer protocols were discussed, as well as the development of enhanced reliability tools through joint operating agreements. It was suggested that regional planning and large wholesale markets support regional reliability. It was concluded that regional RTO markets have evolved to produce economic efficiency and enhanced reliability in short-term and mid-term operations, and provide transparent regional information that will assist in providing data in the future, in order to address the long-term infrastructure investment concerns that exist on a national level.

  17. Reliability programs for nuclear power plants. Regulatory standard S-98 revision 1

    International Nuclear Information System (INIS)

    2005-07-01

    The purpose of this regulatory standard is to help assure, in accordance with the purpose of the Nuclear Safety and Control Act (NSCA), that a licensee who constructs or operates a nuclear power plant (NPP) develops and implements a reliability program that assures that the systems important to safety at the plant can and will meet their defined design and performance specifications at acceptable levels of reliability throughout the lifetime of the facility. This regulatory standard describes the requirements of a reliability program for a nuclear power plant. The licensee shall implement the requirements described in this regulatory standard when a condition of a licence or other legally enforceable instrument so requires.(author)

  18. Infrastructure monitoring with spaceborne SAR sensors

    CERN Document Server

    ANGHEL, ANDREI; CACOVEANU, REMUS

    2017-01-01

    This book presents a novel non-intrusive infrastructure monitoring technique based on the detection and tracking of scattering centers in spaceborne SAR images. The methodology essentially consists of refocusing each available SAR image on an imposed 3D point cloud associated to the envisaged infrastructure element and identifying the reliable scatterers to be monitored by means of four dimensional (4D) tomography. The methodology described in this book provides a new perspective on infrastructure monitoring with spaceborne SAR images, is based on a standalone processing chain, and brings innovative technical aspects relative to conventional approaches. The book is intended primarily for professionals and researchers working in the area of critical infrastructure monitoring by radar remote sensing.

  19. Summary of component reliability data for probabilistic safety analysis of Korean standard nuclear power plant

    International Nuclear Information System (INIS)

    Choi, S. Y.; Han, S. H.

    2004-01-01

    The reliability data of Korean NPP that reflects the plant specific characteristics is necessary for PSA of Korean nuclear power plants. We have performed a study to develop the component reliability DB and S/W for component reliability analysis. Based on the system, we had have collected the component operation data and failure/repair data during plant operation data to 1998/2000 for YGN 3,4/UCN 3,4 respectively. Recently, we have upgraded the database by collecting additional data by 2002 for Korean standard nuclear power plants and performed component reliability analysis and Bayesian analysis again. In this paper, we supply the summary of component reliability data for probabilistic safety analysis of Korean standard nuclear power plant and describe the plant specific characteristics compared to the generic data

  20. Thermal Management and Reliability of Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant

    2016-06-13

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil - by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines are presented.

  1. Reliability and discriminatory power of methods for dental plaque quantification

    Directory of Open Access Journals (Sweden)

    Daniela Prócida Raggio

    2010-04-01

    Full Text Available OBJECTIVE: This in situ study evaluated the discriminatory power and reliability of methods of dental plaque quantification and the relationship between visual indices (VI and fluorescence camera (FC to detect plaque. MATERIAL AND METHODS: Six volunteers used palatal appliances with six bovine enamel blocks presenting different stages of plaque accumulation. The presence of plaque with and without disclosing was assessed using VI. Images were obtained with FC and digital camera in both conditions. The area covered by plaque was assessed. Examinations were done by two independent examiners. Data were analyzed by Kruskal-Wallis and Kappa tests to compare different conditions of samples and to assess the inter-examiner reproducibility. RESULTS: Some methods presented adequate reproducibility. The Turesky index and the assessment of area covered by disclosed plaque in the FC images presented the highest discriminatory powers. CONCLUSION: The Turesky index and images with FC with disclosing present good reliability and discriminatory power in quantifying dental plaque.

  2. The evaluation of operator reliability factors on power reactor

    International Nuclear Information System (INIS)

    Karlina, Itjeu; Supriatna, Piping; W, Suharyo; Santosa, Kussigit; Darlis; S, Bambang; Y, Sasongko

    1999-01-01

    The sophisticated technology system was not assured the reliability system itself because it has contained a part of human dependence affected successfully of reactor operation either how work smoothly and safe or failure ac cured and then accident appears promptly. The evaluation of operator reliability factor on ABWR power reactor has been carried out which consist of criterion skill and workload according to NUREG/CR-2254, NUREG/CR-4016 and NUREG-0835 the reactor operation reliability emphasize to the operator are synergic between skill and workload themselves. The employee's skill will affect to the type and level of their tasks. The operator's skill depend on education and experiences, position or responsibility of tasks, physical conditions (age uninvalid of physic/mental

  3. Fuse Modeling for Reliability Study of Power Electronic Circuits

    DEFF Research Database (Denmark)

    Bahman, Amir Sajjad; Iannuzzo, Francesco; Blaabjerg, Frede

    2017-01-01

    This paper describes a comprehensive modeling approach on reliability of fuses used in power electronic circuits. When fuses are subjected to current pulses, cyclic temperature stress is introduced to the fuse element and will wear out the component. Furthermore, the fuse may be used in a large......, and rated voltage/current are opposed to shift in time to effect early breaking during the normal operation of the circuit. Therefore, in such cases, a reliable protection required for the other circuit components will not be achieved. The thermo-mechanical models, fatigue analysis and thermo...

  4. Apples to Apples: Equivalent-Reliability Power Systems Across Diverse Resource Mix Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Stephen, Gordon W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Frew, Bethany A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Sigler, Devon [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jones, Wesley B [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-28

    Electricity market research is highly price sensitive, and prices are strongly influenced by balance of supply and demand. This work looks at how to combine capacity expansion models and reliability assessment tools to assess equivalent-reliability power systems across diverse resource mix scenarios.

  5. Study on application of a high-speed trigger-type SFCL (TSFCL) for interconnection of power systems with different reliabilities

    International Nuclear Information System (INIS)

    Kim, Hye Ji; Yoon, Yong Tae

    2016-01-01

    Highlights: • Application of TSFCL to interconnect systems with different reliabilities is proposed. • TSFCL protects a grid by preventing detrimental effects from being delivered through the interconnection line. • A high-speed TSFCL with high impedance for transmission systems is required to be developed. - Abstract: Interconnection of power systems is one effective way to improve power supply reliability. However, differences in the reliability of each power system create a greater obstacle for the stable interconnection of power systems, as after interconnection a high-reliability system is affected by frequent faults in low reliability side systems. Several power system interconnection methods, such as the back-to-back method and the installation of either transformers or series reactors, have been investigated to counteract the damage caused by faults in the other neighboring systems. However, these methods are uneconomical and require complex operational management plans. In this work, a high-speed trigger-type superconducting fault current limiter (TSFCL) with large-impedance is proposed as a solution to maintain reliability and power quality when a high reliability power system is interconnected with a low reliability power system. Through analysis of the reliability index for the numerical examples obtained from a PSCAD/EMTDC simulator, a high-speed TSFCL with a large-impedance is confirmed to be effective for the interconnection between power systems with different reliabilities.

  6. Managing Sustainable Demand-side Infrastructure for Power System Ancillary Services

    Science.gov (United States)

    Parkinson, Simon Christopher

    Widespread access to renewable electricity is seen as a viable method to mitigate carbon emissions, although problematic are the issues associated with the integration of the generation systems within current power system configurations. Wind power plants are the primary large-scale renewable generation technology applied globally, but display considerable short-term supply variability that is difficult to predict. Power systems are currently not designed to operate under these conditions, and results in the need to increase operating reserve in order to guarantee stability. Often, operating conventional generation as reserve is both technically and economically inefficient, which can overshadow positive benefits associated with renewable energy exploitation. The purpose of this thesis is to introduce and assess an alternative method of enhancing power system operations through the control of electric loads. In particular, this thesis focuses on managing highly-distributed sustainable demand-side infrastructure, in the form of heat pumps, electric vehicles, and electrolyzers, as dispatchable short-term energy balancing resources. The main contribution of the thesis is an optimal control strategy capable of simultaneously balancing grid- and demand-side objectives. The viability of the load control strategy is assessed through model-based simulations that explicitly track end-use functionality of responsive devices within a power systems analysis typically implemented to observe the effects of integrated wind energy systems. Results indicate that there is great potential for the proposed method to displace the need for increased reserve capacity in systems considering a high penetration of wind energy, thereby allowing conventional generation to operate more efficiently and avoid the need for possible capacity expansions.

  7. Design for Reliability and Robustness Tool Platform for Power Electronic Systems – Study Case on Motor Drive Applications

    DEFF Research Database (Denmark)

    Vernica, Ionut; Wang, Huai; Blaabjerg, Frede

    2018-01-01

    conventional approach, mainly based on failure statistics from the field, the reliability evaluation of the power devices is still a challenging task. In order to address the given problem, a MATLAB based reliability assessment tool has been developed. The Design for Reliability and Robustness (DfR2) tool...... allows the user to easily investigate the reliability performance of the power electronic components (or sub-systems) under given input mission profiles and operating conditions. The main concept of the tool and its framework are introduced, highlighting the reliability assessment procedure for power...... semiconductor devices. Finally, a motor drive application is implemented and the reliability performance of the power devices is investigated with the help of the DfR2 tool, and the resulting reliability metrics are presented....

  8. Modeling reliability of power systems substations by using stochastic automata networks

    International Nuclear Information System (INIS)

    Šnipas, Mindaugas; Radziukynas, Virginijus; Valakevičius, Eimutis

    2017-01-01

    In this paper, stochastic automata networks (SANs) formalism to model reliability of power systems substations is applied. The proposed strategy allows reducing the size of state space of Markov chain model and simplifying system specification. Two case studies of standard configurations of substations are considered in detail. SAN models with different assumptions were created. SAN approach is compared with exact reliability calculation by using a minimal path set method. Modeling results showed that total independence of automata can be assumed for relatively small power systems substations with reliable equipment. In this case, the implementation of Markov chain model by a using SAN method is a relatively easy task. - Highlights: • We present the methodology to apply stochastic automata network formalism to create Markov chain models of power systems. • The stochastic automata network approach is combined with minimal path sets and structural functions. • Two models of substation configurations with different model assumptions are presented to illustrate the proposed methodology. • Modeling results of system with independent automata and functional transition rates are similar. • The conditions when total independence of automata can be assumed are addressed.

  9. Quality assurance/quality control, reliability and availability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1981-01-01

    In a first part this lectures will present a survey on nuclear power production and plant performance in the Western World and discuss key parameters such as load factors and non-availability. Some main reasons for reliable performance of nuclear power plants are given. The second part of this lecture deals with the question how quality assurance and quality control measures do directly influence plant reliability, availability and, thus, economy. Derived from worldwide experience gained from operating nuclear power plants, it may be concluded that the implementation of an overall quality assurance programme does not only satisfy safety requirements set forth by the nuclear regulatory bodies, but has also a considerable impact on plant reliability and availability. A positive effect on these figures will be achieved if the established quality assurance programme provides for a coordinated approach to all activities affecting quality. It is discussed how the quality of a product should be controlled and what kind of quality assurance measures by performed examples are given to demonstrate that the expenditure for maintenance work on components will decrease if planned and systematic quality assurance actions have been implemented during all procurement stages. (orig./RW)

  10. Problems and solutions of reliability issues for external power supply in the coal mines

    Directory of Open Access Journals (Sweden)

    И. Ю. Семыкина

    2017-08-01

    Full Text Available Restructuring of the energy sector  and liberalization of the electricity market resulted in separation of a single industry into a multitude of generating companies, federal and interregional distribution utilities, regional power providers and energy suppliers. For a number of reasons, related to the process of managing separate companies, faults in the laws and regulations, and unsatisfactory technical state of the energy equipment both on the part of distributors and consumers, reliability of energy supply faces increasing negative trends, which potentially can lead to big problems. Up to this day the energy sector does not have a developed database on the state of equipment and results of its maintenance, nor has it defined criteria to actually assess technical conditions of the equipment. The authors propose to develop and implement a mechanism aimed at technical auditing and monitoring of the engineering state of external power supply system, whose results can help in the development of more efficient and economically sound measures to improve reliability of energy supply. In recent years, a lot of attention has been paid to the issues of enhanced security of industrial power supply. However, specific characteristics of underground coal mining and enormous work load of the production process limit the applicability of developed methods and algorithms. Existing research does not address economic issues of reliable energy supply, either direct (economic damage from power interruptions, contractual security of supply, tariff regulation or indirect (charges for utility connection with a required level of reliability. There is no explicit definition for the term «autonomous energy source», nor is there a list of power receivers falling into the first and «special» categories according to their reliability. The paper contains a range of urgent problems and solutions that will increase reliability of external power supply in the coal mines.

  11. Problem-Oriented Simulation Packages and Computational Infrastructure for Numerical Studies of Powerful Gyrotrons

    International Nuclear Information System (INIS)

    Damyanova, M; Sabchevski, S; Vasileva, E; Balabanova, E; Zhelyazkov, I; Dankov, P; Malinov, P

    2016-01-01

    Powerful gyrotrons are necessary as sources of strong microwaves for electron cyclotron resonance heating (ECRH) and electron cyclotron current drive (ECCD) of magnetically confined plasmas in various reactors (most notably ITER) for controlled thermonuclear fusion. Adequate physical models and efficient problem-oriented software packages are essential tools for numerical studies, analysis, optimization and computer-aided design (CAD) of such high-performance gyrotrons operating in a CW mode and delivering output power of the order of 1-2 MW. In this report we present the current status of our simulation tools (physical models, numerical codes, pre- and post-processing programs, etc.) as well as the computational infrastructure on which they are being developed, maintained and executed. (paper)

  12. Cyber security in nuclear power plants and its portability to other industrial infrastructures

    Energy Technology Data Exchange (ETDEWEB)

    Champigny, Sebastien; Gupta, Deeksha; Watson, Venesa; Waedt, Karl [AREVA GmbH, Erlangen (Germany)

    2017-06-15

    Power generation increasingly relies on decentralised and interconnected computerised systems. Concepts like ''Industrial Internet of Things'' of the Industrial Internet Consortium (IIC), and ''Industry 4.0'' find their way in this strategic industry. Risk of targeted exploits of errors and vulnerabilities increases with complexity, interconnectivity and decentralization. Inherently stringent security requirements and features make nuclear computerised applications and systems a benchmark for industrial counterparts seeking to hedge against those risks. Consequently, this contribution presents usual cyber security regulations and practices for nuclear power plants. It shows how nuclear cyber security can be ported and used in an industrial context to protect critical infrastructures against cyber-attacks and industrial espionage.

  13. Digital Trade Infrastructures: A Framework for Analysis

    Directory of Open Access Journals (Sweden)

    Boriana Boriana

    2018-04-01

    Full Text Available In global supply chains, information about transactions resides in fragmented pockets within business and government systems. The lack of reliable, accurate and complete information makes it hard to detect risks (such as safety, security, compliance and commercial risks and at the same time makes international trade inefficient. The introduction of digital infrastructures that transcend organizational and system domains is driven by the prospect of reducing the fragmentation of information, thereby enabling improved security and efficiency in the trading process. This article develops a digital trade infrastructure framework through an empirically grounded analysis of four digital infrastructures in the trade domain, using the conceptual lens of digital infrastructure.

  14. N2R vs. DR Network Infrastructure Evaluation

    DEFF Research Database (Denmark)

    Pedersen, Jens Myrup; Roost, Lars Jessen; Toft, Per Nesager

    2007-01-01

    Recent development of Internet-based services has set higher requirements to network infrastructures in terms of more bandwidth, lower delays and more reliability. Theoretical research within the area of Structural Quality of Service (SQoS) has introduced a new type of infrastructure which meet...... these requirements: N2R infrastructures. This paper contributes to the ongoing research with a case study from North Jutland. An evaluation of three N2R infrastructures compared to a Double Ring (DR) infrastructure will provide valuable information of the practical applicability of N2R infrastructures. In order...... to study if N2R infrastructures perform better than the DR infrastructure, a distribution network was established based on geographical information system (GIS) data. Nodes were placed with respect to demographic and geographical factors. The established distribution network was investigated with respect...

  15. In-plant reliability data base for nuclear power plant components: data collection and methodology report

    International Nuclear Information System (INIS)

    Drago, J.P.; Borkowski, R.J.; Pike, D.H.; Goldberg, F.F.

    1982-07-01

    The development of a component reliability data for use in nuclear power plant probabilistic risk assessments and reliabiilty studies is presented in this report. The sources of the data are the in-plant maintenance work request records from a sample of nuclear power plants. This data base is called the In-Plant Reliability Data (IPRD) system. Features of the IPRD system are compared with other data sources such as the Licensee Event Report system, the Nuclear Plant Reliability Data system, and IEEE Standard 500. Generic descriptions of nuclear power plant systems formulated for IPRD are given

  16. The integrated North American electricity market : a bi-national model for securing a reliable supply of electricity

    International Nuclear Information System (INIS)

    Egan, T.

    2004-03-01

    The 50 million people who experienced the power blackout on August 14, 2003 in southern Ontario and the U.S. Midwest and Northeast understood how vital electricity is in our day-to-day lives, but they also saw the resiliency of the North American electricity system. More than 65 per cent of the power generation was restored to service within 12 hours and no damage was caused to the generation or transmission facilities. Although the interconnected North American electricity system is among the most reliable in the world, it is threatened by an aging infrastructure, lack of new generation and transmission to meet demand, and growing regulatory pressures. This report suggests that any measures that respond to the threat of ongoing reliability should be bi-national in scope due to the interconnected nature of the system. Currently, the market, regulatory and administrative systems are different in each country. The full engagement and cooperation of both Canada and the United States is important to ensure future cross-border trade and power reliability. The Canadian Electricity Association proposes the following 7 measures: (1) support an open debate on all the supply options available to meet growing power demands, (2) promote bi-national cooperation in the construction of new transmission capacity to ensure a reliable continental electricity system, (3) examine opportunities for bi-national cooperation for investment in advanced transmission technologies and transmission research and development, (4) promote new generation technology and demand-side measures to relieve existing transmission constraints and reduce the need for new transmission facilities, (5) endorse a self-governing international organization for developing and enforcing mandatory reliability standards for the electricity industry, (6) coordinate measures to promote critical infrastructure protection, and (7) harmonize U.S. and Canadian efforts to streamline or clarify regulation of electricity

  17. A study in the reliability analysis method for nuclear power plant structures (I)

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Byung Hwan; Choi, Seong Cheol; Shin, Ho Sang; Yang, In Hwan; Kim, Yi Sung; Yu, Young; Kim, Se Hun [Seoul, Nationl Univ., Seoul (Korea, Republic of)

    1999-03-15

    Nuclear power plant structures may be exposed to aggressive environmental effects that may cause their strength and stiffness to decrease over their service life. Although the physics of these damage mechanisms are reasonably well understood and quantitative evaluation of their effects on time-dependent structural behavior is possible in some instances, such evaluations are generally very difficult and remain novel. The assessment of existing steel containment in nuclear power plants for continued service must provide quantitative evidence that they are able to withstand future extreme loads during a service period with an acceptable level of reliability. Rational methodologies to perform the reliability assessment can be developed from mechanistic models of structural deterioration, using time-dependent structural reliability analysis to take loading and strength uncertainties into account. The final goal of this study is to develop the analysis method for the reliability of containment structures. The cause and mechanism of corrosion is first clarified and the reliability assessment method has been established. By introducing the equivalent normal distribution, the procedure of reliability analysis which can determine the failure probabilities has been established. The influence of design variables to reliability and the relation between the reliability and service life will be continued second year research.

  18. Thermal Management and Reliability of Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant

    2016-08-03

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil -- by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines will be presented.

  19. Demonstration of Essential Reliability Services by a 300-MW Solar Photovoltaic Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Loutan, Clyde; Klauer, Peter; Chowdhury, Sirajul; Hall, Stephen; Morjaria, Mahesh; Chadliev, Vladimir; Milam, Nick; Milan, Christopher; Gevorgian, Vahan

    2017-03-24

    The California Independent System Operator (CAISO), First Solar, and the National Renewable Energy Laboratory (NREL) conducted a demonstration project on a large utility-scale photovoltaic (PV) power plant in California to test its ability to provide essential ancillary services to the electric grid. With increasing shares of solar- and wind-generated energy on the electric grid, traditional generation resources equipped with automatic governor control (AGC) and automatic voltage regulation controls -- specifically, fossil thermal -- are being displaced. The deployment of utility-scale, grid-friendly PV power plants that incorporate advanced capabilities to support grid stability and reliability is essential for the large-scale integration of PV generation into the electric power grid, among other technical requirements. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, PV power plants can be used to mitigate the impact of variability on the grid, a role typically reserved for conventional generators. In August 2016, testing was completed on First Solar's 300-MW PV power plant, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to use grid-friendly controls to provide essential reliability services. These data showed how the development of advanced power controls can enable PV to become a provider of a wide range of grid services, including spinning reserves, load following, voltage support, ramping, frequency response, variability smoothing, and frequency regulation to power quality. Specifically, the tests conducted included various forms of active power control such as AGC and frequency regulation; droop response; and reactive power, voltage, and power factor controls. This project demonstrated that advanced power electronics and solar generation can be

  20. Nuclear power newsletter, Vol. 6, no. 1, March 2009

    International Nuclear Information System (INIS)

    2009-03-01

    The main topics in the current issue are: Natural Circulation Phenomena, Modelling, and Reliability of Passive Systems that Utilize Natural Circulation; Training and Development for Nuclear Power Plant Managers; Review Mission on the Ageing Management Programme Held at Paks Nuclear Power Plant; Detection, Research, Management and Monitoring of Ageing Factors in Nuclear Power Plants; Good Practices to Manage Stress Corrosion Cracking of Austenitic Alloys in Light Water Reactors; Management Systems; Strengthening Nuclear Power Infrastructure; PRADA and a systematic approach of Acquisition/Diversion Pathway Analysis; Natural Circulation Phenomena, Modeling, and Reliability of Passive Systems that Utilize Natural Circulation; Small Reactors without On-site Refueling; Developing Methodologies to Assess Passive Safety System Performance in Advanced Reactors; IAEA Fast Reactor Knowledge Preservation Initiative (FRKP)

  1. Conceptual Software Reliability Prediction Models for Nuclear Power Plant Safety Systems

    International Nuclear Information System (INIS)

    Johnson, G.; Lawrence, D.; Yu, H.

    2000-01-01

    The objective of this project is to develop a method to predict the potential reliability of software to be used in a digital system instrumentation and control system. The reliability prediction is to make use of existing measures of software reliability such as those described in IEEE Std 982 and 982.2. This prediction must be of sufficient accuracy to provide a value for uncertainty that could be used in a nuclear power plant probabilistic risk assessment (PRA). For the purposes of the project, reliability was defined to be the probability that the digital system will successfully perform its intended safety function (for the distribution of conditions under which it is expected to respond) upon demand with no unintended functions that might affect system safety. The ultimate objective is to use the identified measures to develop a method for predicting the potential quantitative reliability of a digital system. The reliability prediction models proposed in this report are conceptual in nature. That is, possible prediction techniques are proposed and trial models are built, but in order to become a useful tool for predicting reliability, the models must be tested, modified according to the results, and validated. Using methods outlined by this project, models could be constructed to develop reliability estimates for elements of software systems. This would require careful review and refinement of the models, development of model parameters from actual experience data or expert elicitation, and careful validation. By combining these reliability estimates (generated from the validated models for the constituent parts) in structural software models, the reliability of the software system could then be predicted. Modeling digital system reliability will also require that methods be developed for combining reliability estimates for hardware and software. System structural models must also be developed in order to predict system reliability based upon the reliability

  2. Component aging and reliability trends in Loviisa Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jankala, K.E.; Vaurio, J.K.

    1989-01-01

    A plant-specific reliability data collection and analysis system has been developed at the Loviisa Nuclear Power Plant to perform tests for component aging and analysis of reliability trends. The system yields both mean values an uncertainty distribution information for reliability parameters to be used in the PSA project underway and in living-PSA applications. Several different trend models are included in the reliability analysis system. Simple analytical expressions have been derived from the parameters of these models, and their variances have been obtained using the information matrix. This paper is focused on the details of the learning/aging models and the estimation of their parameters and statistical accuracies. Applications to the historical data of the Loviisa plant are presented. The results indicate both up- and down-trends in failure rates as well as individuality between nominally identical components

  3. Reliability analyses of safety systems for WWER-440 nuclear power plants

    International Nuclear Information System (INIS)

    Dusek, J.; Hojny, V.

    1985-01-01

    The UJV in Rez near Prague studied the reliability of the system of emergency core cooling and of the system for suppressing pressure in the sealed area of the nuclear power plant in the occurrence of a loss-of-coolant accident. The reliability of the systems was evaluated by failure tree analysis. Simulation and analytical calculation programs were developed and used for the reliability analysis. The results are briefly presented of the reliability analyses of the passive system for the immediate short-term flooding of the reactor core, of the active low-pressure system of emergency core cooling, the spray system, the bubble-vacuum system and the system of emergency supply of the steam generators. (E.S.)

  4. Design for reliability in power electronics in renewable energy systems – status and future

    DEFF Research Database (Denmark)

    Wang, Huai; Blaabjerg, Frede; Ma, Ke

    2013-01-01

    Advances in power electronics enable efficient and flexible interconnection of renewable sources, loads and electric grids. While targets concerning efficiency of power converters are within reach, recent research endeavors to predict and improve their reliability to ensure high availability, low...... maintenance costs, and herefore, low Levelized-Cost-of-Energy (LCOE) of renewable energy systems. This paper presents the prior-art Design for Reliability (DFR) process for power converters and addresses the paradigm shift to Physics-of-Failure (PoF) approach and mission profile based analysis. Moreover...

  5. The evaluation of equipment and Instrumentation Reliability Factors on Power Reactor

    International Nuclear Information System (INIS)

    Supriatna, Piping; Karlina, Itjeu; Widagdo, Suharyo; Santosa, Kussigit; Darlis; Sudiyono, Bambang; Yuniyanta, Sasongko; Sudarmin

    1999-01-01

    Equipment and instrumentation reliability on type power reactor control room was determined by its pattern and design. the principle of ergonomy applied on equipment and instrumentation layout in this ABWR type reactor are geometric pattern appropriate with economic body motion, average anthropometry data of operator especially operator hand-reach, range of vision, angle of vision, lighting, color arrangement and harmony as will as operator case in operating the equipment system. Limitation criteria of the parameter mentioned above are based on EPRI NP-3659, NURG 0700, and NUREG/CR-3331 documents. Besides that, the (working) physical environment parameter factor of the control room must be designed in order to fulfil the standard criteria of ergonomic condition based on NUREG-0800. The reliability evaluation of equipment and instrumentation system also occurs observed from man machine interaction side which happen between operator and equipment and instrumentation in the ABWR type power reactor control room. From the MMI analysis can be known the working failure possibility which is caused by the operator. The evaluation result of equipment and instrumentation reliability on ABWR type power reactor control room showed that the design of this ABWR control room is good and fulfils the ergonomy standard criteria have been determined

  6. Reliability of microcircuits in nuclear power plants

    International Nuclear Information System (INIS)

    Cross, P.M.; Taplin, R.C.

    1986-06-01

    The reliability problems associated with modernizing control systems in nuclear power plants, particularly by using new technology microcircuits, are discussed and twelve problem areas identified. These are: new technology introduction; variability in manufacture; derating necessities; distributed systems; use of redundancy; electrostatic discharge damage; electromagnetic interference; nuclear radiation; thermal effects; contamination, including humidity; mechanical effects, including vibration; and testing. Recommendations for the AECB are given in each area. Guidelines are given for the design, procurement, installation, operation and maintenance stages of use. Recommendations for further work are given

  7. Improving the reliability of Class 1E power distribution to instrumentation and control cabinets on nuclear power plants in the USA. Final report

    International Nuclear Information System (INIS)

    Brennen, M.B.

    1995-09-01

    This study was conducted to explore nontraditional electric power distribution concepts to improve the reliability of uninterruptible power to vital Instrumentation and Control (I and C) cabinets in future US nuclear power plants. The study incorporated comparative technical and economic evaluations of existing and nontraditional uninterruptible power supply (UPS) concepts. All nontraditional distribution concepts were based on available or already emerging components or semiconductor devices. Another purpose of the study was to reduce the cost and complexity of present power distribution and to lower maintenance, replacement, degradation and fault location requirements. The possible reduction of distribution losses, especially during operation under battery power, was also evaluated. The study indicates that direct current distribution at 48 or 125 Vdc levels would have more than an order of magnitude improvement over the reliability of present alternating current supplies at comparable cost. Furthermore, losses under battery power could be reduced significantly with respect to present distribution losses. An inherent advantage of DC distribution is that power transfer from the failed power bus to an operational bus occurs naturally and instantaneously via two simple and reliable semiconductor diodes. AC distribution, on the other hand, requires complex synchronization, decision making and gated semiconductor switching devices for power bus transfer all of which could be eliminated. Some of the concepts presented may also be applied to make existing vital (Class 1E) uninterruptible power supplies in US nuclear plants more reliable

  8. Reliability Evaluation of a Single-phase H-bridge Inverter with Integrated Active Power Decoupling

    DEFF Research Database (Denmark)

    Tang, Junchaojie; Wang, Haoran; Ma, Siyuan

    2016-01-01

    it with the traditional passive DC-link solution. The converter level reliability is obtained by component level electro-thermal stress modeling, lifetime model, Weibull distribution, and Reliability Block Diagram (RBD) method. The results are demonstrated by a 2 kW single-phase inverter application.......Various power decoupling methods have been proposed recently to replace the DC-link Electrolytic Capacitors (E-caps) in single-phase conversion system, in order to extend the lifetime and improve the reliability of the DC-link. However, it is still an open question whether the converter level...... reliability becomes better or not, since additional components are introduced and the loading of the existing components may be changed. This paper aims to study the converter level reliability of a single-phase full-bridge inverter with two kinds of active power decoupling module and to compare...

  9. Reliability of diesel generators at the Finnish and Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Pulkkinen, Urho [Technical Research Centre of Finland, Vuorimiehentie 5, SF-02150, Espoo (Finland)

    1986-02-15

    The operating experiences of 40 stand-by diesel generators at the Finnish and Swedish nuclear power plants have been analysed with special emphasis on the impact of the frequency of surveillance testing and of the test procedure on diesel generator reliability, the contribution of design, manufacturing, testing and maintenance errors and the potential and actual common cause failures, The results pf the analyses consisted both practical recommendations and mathematical reliability models and useful reliability data. (author)

  10. Alternatives to coal and candles: wind power in China

    International Nuclear Information System (INIS)

    Lew, Debra J.

    2000-01-01

    China is in a unique position to be able to exploit her vast wind resources to satisfy both the rapidly growing energy demand which fuels her economy as well as needs of approximately 72 million people who live in rural areas and have no access to conventional electricity services. China, mainly through the efforts of the Inner Mongolia Autonomous Region, has already successfully disseminated over 150,000 small-scale wind electric generators which power households in rural areas, through a well-coordinated combination of local research and development, technology transfer, industry support, end-user incentives, and an infrastructure for information dissemination and technical training. In this paper, we review China's utilisation of wind energy and discuss how it can be increased for both rural electrification and the rapidly growing power sector. We find that novel approaches in technical implementation of wind power use may help to better meet China's needs. Use of hybrid systems may help to provide higher quality, more reliable power for rural households and villages than is currently provided through wind-only systems. Grid-connected wind power, which currently is more costly and less reliable than coal power, can become cost-competitive and more reliable through local, mass production of wind turbines combined with storage systems. We examine governmental support, through policy, infrastructure development and financial incentives, that have fostered the successes of dissemination of small-scale wind turbines and also the support, or lack thereof, that has hindered commercial development of large-scale wind power, We find that a better policy and regulatory framework is the most important measure that China can take to increase the use of this indigenous, clean resource. (Author)

  11. Reliability and Energy Loss in Full-scale Wind Power Converter Considering Grid Codes and Wind Classes

    DEFF Research Database (Denmark)

    Zhou, Dao; Blaabjerg, Frede; Franke, Toke

    2014-01-01

    With the increasing penetration of the wind power, reliable operation and cost-effective wind energy production are of more and more importance. As one of the promising configurations, the cost on reliability and production losses of permanent-magnet synchronous generator based full-scale wind......, if the specific designed wind turbine system operates at different wind classes, it can be seen that higher wind class level results in lower lifetime of the power converter. In respect to the cost of the reactive power, either the OE or the UE reactive power increases the energy loss per year significantly...... power converter is studied considering the grid code with reactive power production as well as the annual wind profile. Regarding the reliability, it is found that either the Over-Excited (OE) or the Under-Excited (UE) reactive power injection threatens the lifespan under all wind classes. Meanwhile...

  12. Kilowatt isotope power system. Phase II plan. Volume V. Safety, quality assurance and reliability

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Included in this volume are: launch and flight safety considerations; quality assurance techniques and procedures to be followed through system fabrication, assembly and inspection; and the reliability program made up of reliability prediction analysis, failure mode analysis and criticality analysis

  13. Perform qualify reliability-power tests by shooting common mistakes: practical problems and standard answers per Telcordia/Bellcore requests

    Science.gov (United States)

    Yu, Zheng

    2002-08-01

    Facing the new demands of the optical fiber communications market, almost all the performance and reliability of optical network system are dependent on the qualification of the fiber optics components. So, how to comply with the system requirements, the Telcordia / Bellcore reliability and high-power testing has become the key issue for the fiber optics components manufacturers. The qualification of Telcordia / Bellcore reliability or high-power testing is a crucial issue for the manufacturers. It is relating to who is the outstanding one in the intense competition market. These testing also need maintenances and optimizations. Now, work on the reliability and high-power testing have become the new demands in the market. The way is needed to get the 'Triple-Win' goal expected by the component-makers, the reliability-testers and the system-users. To those who are meeting practical problems for the testing, there are following seven topics that deal with how to shoot the common mistakes to perform qualify reliability and high-power testing: ¸ Qualification maintenance requirements for the reliability testing ¸ Lots control for preparing the reliability testing ¸ Sampling select per the reliability testing ¸ Interim measurements during the reliability testing ¸ Basic referencing factors relating to the high-power testing ¸ Necessity of re-qualification testing for the changing of producing ¸ Understanding the similarity for product family by the definitions

  14. Reliability data of fire protection equipment and features in German nuclear power plants

    International Nuclear Information System (INIS)

    Roewekamp, M.; Riekert, T.; Sehrbrock, W.

    1997-01-01

    In order to perform probabilistic fire safety analyses, a comprehensive data base is needed including physical characteristics of fire compartments and their inventory, fire occurrence frequencies, technical reliability data for all fire-related equipment, human actions and human error probabilities, etc. In order to provide updated and realistic reliability data, the operational behaviour of different fire protection features in two German nuclear power plants was analysed in the framework of the study presented here. The analyses are based on the examination of reported results of the regular inspection and maintenance programs for nuclear power plants. Besides a plant specific assessment of the reliability data a generic assessment for an application as input data for fault tree analyses in the framework of probabilistic risk studies for other German plants was carried out. The analyses of failures and unavailabilities gave the impression that most of them are single failures without relevance for the plant safety. The data gained from NPPs were compared to reliability data of the German insurance companies for the same protection features installed in non-nuclear installations and to older nuclear specific reliability data. This comparison showed up a higher reliability. (orig.) [de

  15. Application of fault tree analysis for customer reliability assessment of a distribution power system

    International Nuclear Information System (INIS)

    Abdul Rahman, Fariz; Varuttamaseni, Athi; Kintner-Meyer, Michael; Lee, John C.

    2013-01-01

    A new method is developed for predicting customer reliability of a distribution power system using the fault tree approach with customer weighted values of component failure frequencies and downtimes. Conventional customer reliability prediction of the electric grid employs the system average (SA) component failure frequency and downtime that are weighted by only the quantity of the components in the system. These SA parameters are then used to calculate the reliability and availability of components in the system, and eventually to find the effect on customer reliability. Although this approach is intuitive, information is lost regarding customer disturbance experiences when customer information is not utilized in the SA parameter calculations, contributing to inaccuracies when predicting customer reliability indices in our study. Hence our new approach directly incorporates customer disturbance information in component failure frequency and downtime calculations by weighting these parameters with information of customer interruptions. This customer weighted (CW) approach significantly improves the prediction of customer reliability indices when applied to our reliability model with fault tree and two-state Markov chain formulations. Our method has been successfully applied to an actual distribution power system that serves over 2.1 million customers. Our results show an improved benchmarking performance on the system average interruption frequency index (SAIFI) by 26% between the SA-based and CW-based reliability calculations. - Highlights: ► We model the reliability of a power system with fault tree and two-state Markov chain. ► We propose using customer weighted component failure frequencies and downtimes. ► Results show customer weighted values perform superior to component average values. ► This method successfully incorporates customer disturbance information into the model.

  16. 'System-of-systems' approach for interdependent critical infrastructures

    International Nuclear Information System (INIS)

    Eusgeld, Irene; Nan, Cen; Dietz, Sven

    2011-01-01

    The study of the interdependencies within critical infrastructures (CI) is a growing field of research as the importance of potential failure propagation among infrastructures may lead to cascades affecting all supply networks. New powerful methods are required to model and describe such 'systems-of-systems' (SoS) as a whole. An overall model is required to provide security and reliability assessment taking into account various kinds of threats and failures. A significant challenge associated with this model may be to create 'what-if' scenarios for the analysis of interdependencies. In this paper the interdependencies between industrial control systems (ICS), in particular SCADA (Supervisory Control and Data Acquisition), and the underlying critical infrastructures to address the vulnerabilities related to the coupling of these systems are analyzed. The modeling alternatives for system-of-systems, integrated versus coupled models, are discussed. An integrated model contains detailed low level models of (sub)systems as well as a high level model, covering all hierarchical levels. On the other hand, a coupled model aggregates different simulated outputs of the low level models as inputs at a higher level. Strengths and weaknesses of both approaches are analyzed and a model architecture for SCADA and the 'system under control' are proposed. Furthermore, the HLA simulation standard is introduced and discussed in this paper as a promising approach to represent interdependencies between infrastructures. To demonstrate the capabilities of the HLA standard for the interdependencies study, an exemplary application and some first results are also briefly presented in this paper.

  17. INFRASTRUCTURE

    CERN Multimedia

    A. Gaddi and P. Tropea

    2011-01-01

    Most of the work relating to Infrastructure has been concentrated in the new CSC and RPC manufactory at building 904, on the Prevessin site. Brand new gas distribution, powering and HVAC infrastructures are being deployed and the production of the first CSC chambers has started. Other activities at the CMS site concern the installation of a new small crane bridge in the Cooling technical room in USC55, in order to facilitate the intervention of the maintenance team in case of major failures of the chilled water pumping units. The laser barrack in USC55 has been also the object of a study, requested by the ECAL community, for the new laser system that shall be delivered in few months. In addition, ordinary maintenance works have been performed during the short machine stops on all the main infrastructures at Point 5 and in preparation to the Year-End Technical Stop (YETS), when most of the systems will be carefully inspected in order to ensure a smooth running through the crucial year 2012. After the incide...

  18. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.

  19. Reliability of Capacitors for DC-Link Applications in Power Electronic Converters

    DEFF Research Database (Denmark)

    Wang, Huai; Blaabjerg, Frede

    2014-01-01

    DC-link capacitors are an important part in the majority of power electronic converters which contribute to cost, size and failure rate on a considerable scale. From capacitor users' viewpoint, this paper presents a review on the improvement of reliability of dc link in power electronic converters...... from two aspects: 1) reliability-oriented dc-link design solutions; 2) conditioning monitoring of dc-link capacitors during operation. Failure mechanisms, failure modes and lifetime models of capacitors suitable for the applications are also discussed as a basis to understand the physics......-of-failure. This review serves to provide a clear picture of the state-of-the-art research in this area and to identify the corresponding challenges and future research directions for capacitors and their dc-link applications....

  20. Reliability and mass analysis of dynamic power conversion systems with parallel or standby redundancy

    Science.gov (United States)

    Juhasz, Albert J.; Bloomfield, Harvey S.

    1987-01-01

    A combinatorial reliability approach was used to identify potential dynamic power conversion systems for space mission applications. A reliability and mass analysis was also performed, specifically for a 100-kWe nuclear Brayton power conversion system with parallel redundancy. Although this study was done for a reactor outlet temperature of 1100 K, preliminary system mass estimates are also included for reactor outlet temperatures ranging up to 1500 K.

  1. Reliability and mass analysis of dynamic power conversion systems with parallel of standby redundancy

    Science.gov (United States)

    Juhasz, A. J.; Bloomfield, H. S.

    1985-01-01

    A combinatorial reliability approach is used to identify potential dynamic power conversion systems for space mission applications. A reliability and mass analysis is also performed, specifically for a 100 kWe nuclear Brayton power conversion system with parallel redundancy. Although this study is done for a reactor outlet temperature of 1100K, preliminary system mass estimates are also included for reactor outlet temperatures ranging up to 1500 K.

  2. Reliability assurance program for operational emergency ac power system

    International Nuclear Information System (INIS)

    Heineman, J.B.; Ragland, W.A.; Mueller, C.J.

    1985-01-01

    A comprehensive review of emergency ac power systems in nuclear generating plants (the vast majority of these plants contain redundant diesel generator systems) delineates several operational areas that can be improved by instituting a reliability assurance program (RAP), which initially upgrades the diesel generator performance and provides for ongoing monitoring and maintenance based upon alert levels

  3. System Statement of Tasks of Calculating and Providing the Reliability of Heating Cogeneration Plants in Power Systems

    Science.gov (United States)

    Biryuk, V. V.; Tsapkova, A. B.; Larin, E. A.; Livshiz, M. Y.; Sheludko, L. P.

    2018-01-01

    A set of mathematical models for calculating the reliability indexes of structurally complex multifunctional combined installations in heat and power supply systems was developed. Reliability of energy supply is considered as required condition for the creation and operation of heat and power supply systems. The optimal value of the power supply system coefficient F is based on an economic assessment of the consumers’ loss caused by the under-supply of electric power and additional system expences for the creation and operation of an emergency capacity reserve. Rationing of RI of the industrial heat supply is based on the use of concept of technological margin of safety of technological processes. The definition of rationed RI values of heat supply of communal consumers is based on the air temperature level iside the heated premises. The complex allows solving a number of practical tasks for providing reliability of heat supply for consumers. A probabilistic model is developed for calculating the reliability indexes of combined multipurpose heat and power plants in heat-and-power supply systems. The complex of models and calculation programs can be used to solve a wide range of specific tasks of optimization of schemes and parameters of combined heat and power plants and systems, as well as determining the efficiency of various redundance methods to ensure specified reliability of power supply.

  4. A virtual laboratory for micro-grid information and communication infrastructures

    OpenAIRE

    Weimer, James; Xu, Yuzhe; Fischione, Carlo; Johansson, Karl Henrik; Ljungberg, Per; Donovan, Craig; Sutor, Ariane; Fahlén, Lennart E.

    2012-01-01

    Testing smart grid information and communication (ICT) infrastructures is imperative to ensure that they meet industry requirements and standards and do not compromise the grid reliability. Within the micro-grid, this requires identifying and testing ICT infrastructures for communication between distributed energy resources, building, substations, etc. To evaluate various ICT infrastructures for micro-grid deployment, this work introduces the Virtual Micro-Grid Laboratory (VMGL) and provides ...

  5. Information flow a data bank preparation in nuclear power plant reliability information system

    International Nuclear Information System (INIS)

    Kolesa, K.; Vejvodova, I.

    1983-01-01

    In the year 1981 the reliability information system for nuclear power plants (ISS-JE) was established. The objective of the system is to make a statistical evaluation of the operation of nuclear power plants and to obtain information on the reliability of the equipment of nuclear power plants and the transmission of this information to manufacturers with the aim of inducing them to take corrective measures. The HP 1000 computer with the data base system IMAGE 100 is used which allows to process single queries and periodical outputs. The content of periodical outputs designed for various groups of subcontractors is briefly described and trends of the further development of the system indicated. (Ha)

  6. Assessments and applications to enhance human reliability and reduce risk during less-than-full-power operations

    International Nuclear Information System (INIS)

    Hannaman, G.W.; Singh, A.

    1992-01-01

    Study of events, interviews with plant personnel, and applications of risk studies indicate that the risk of a potential accident during less-than-full-power (LTFP) operation is becoming a greater fraction of the risk as improvements are made to the full-power operations. Industry efforts have been increased to reduce risk and the cost of shutdown operations. These efforts consider the development and application of advanced tools to help utilities proactively identify issues and develop contingencies and interventions to enhance reliability and reduce risk of low-power operations at nuclear power plants. The role for human reliability assessments is to help improve utility outage planning to better achieve schedule and risk control objectives. Improvements are expected to include intervention tools to identify and reduce human error, definition of new instructional modules, and prioritization of risk reduction issues for operators. The Electric Power Research Institute is sponsoring a project to address the identification and quantification of factors that affect human reliability during LTFP operation of nuclear power plants. The results of this project are expected to promote the development of proactively applied interventions and contingencies for enhanced human reliability during shutdown operations

  7. Quality assurance requirements for the reliability of nuclear power plants in developing countries

    International Nuclear Information System (INIS)

    Bhutta, S.M.

    1978-01-01

    Quality Assurance (QA) has not been taken very seriously in developing countries despite their having significant nuclear power programmes. This may affect plant reliability and demands that urgent and serious attention be given to the development and implementation of Quality Assurance programmes according to local conditions. Confusion has been created by the differences in definitions and interpretations of terminologies of Quality Assurance and Control. Problems have been aggravated by the lack of clearly defined responsibilities and accountabilities during the projects execution phases of site selection, data collection, design, equipment fabrication and construction, etc. Therefore, reliability of nuclear power plants in developing countries is relatively low. But whenever some programme of QA has been implemented it has helped to improve the plant performance. This is highlighted in this paper by the practical examples for the experience of Karachi Nuclear Power Plant whose forced outages have been reduced by over a half within a period of 3 years. In view of the benefits, a QA programme for Chashma Nuclear Power Project has also been initiated. In this paper urgency is emphasized for the establishment and implementation of a formal QA programme in the developing countries if the reactor suppliers and purchasers both want to ensure higher reliability of their plants. The best way that management can play its role effectively is by setting up a strong QA organization with local personnel, thus helping to attain self-reliance and higher reliability during plant operation. (author)

  8. The contribution of quality assurance to safety and reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Raisic, N.

    1978-01-01

    The potential contribution of quality assurance to nuclear power plant safety and reliability is analysed. An attempt is made to establish a relationship between quality and reliability. The reliability may be expressed in quantitative terms as ''the probability that an item will perform a required function for a stated period of time''. Quality, however, cannot be expressed in simple quantitative terms but only as a set of required properties which an item should have for a specific application. The achievement of quality and additional reliability objectives is a task of project activities such as design, construction, installation, operation, etc. The elements of a quality assurance system and its functions in nuclear power projects are presented in some detail. Confidence in plant quality, which should be a basis for the regulatory body issuing the construction permit or operation licence, should be based on the capability of quality assurance activities to prevent errors and correct deficiencies in nuclear power plants. An analysis is made of those errors in plant design, manufacture, construction and operation which contribute most frequently to plant outages. It is concluded that these errors can be avoided or corrected by strict adherence to quality assurance principles and by the efficient functioning of quality assurance systems. In fact, quality assurance may be considered an effective defence against common cause failures originating in errors in the design, manufacture, installation or operation of a nuclear power plant

  9. Design of power converter in DFIG wind turbine with enhanced system-level reliability

    DEFF Research Database (Denmark)

    Zhou, Dao; Zhang, Guanguan; Blaabjerg, Frede

    2017-01-01

    With the increasing penetration of wind power, reliable and cost-effective wind energy production are of more and more importance. As one of the promising configurations, the doubly-fed induction generator based partial-scale wind power converter is still dominating in the existing wind farms...... margin. It can be seen that the B1 lifetime of the grid-side converter and the rotor-side converter deviates a lot by considering the electrical stresses, while they become more balanced by using an optimized reliable design. The system-level lifetime significantly increases with an appropriate design...

  10. Reliability measurement for mixed mode failures of 33/11 kilovolt electric power distribution stations.

    Directory of Open Access Journals (Sweden)

    Faris M Alwan

    Full Text Available The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter [Formula: see text] and shape parameters [Formula: see text] and [Formula: see text]. Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models.

  11. Study of complete interconnect reliability for a GaAs MMIC power amplifier

    Science.gov (United States)

    Lin, Qian; Wu, Haifeng; Chen, Shan-ji; Jia, Guoqing; Jiang, Wei; Chen, Chao

    2018-05-01

    By combining the finite element analysis (FEA) and artificial neural network (ANN) technique, the complete prediction of interconnect reliability for a monolithic microwave integrated circuit (MMIC) power amplifier (PA) at the both of direct current (DC) and alternating current (AC) operation conditions is achieved effectively in this article. As a example, a MMIC PA is modelled to study the electromigration failure of interconnect. This is the first time to study the interconnect reliability for an MMIC PA at the conditions of DC and AC operation simultaneously. By training the data from FEA, a high accuracy ANN model for PA reliability is constructed. Then, basing on the reliability database which is obtained from the ANN model, it can give important guidance for improving the reliability design for IC.

  12. INFRASTRUCTURE

    CERN Multimedia

    Andrea Gaddi

    2010-01-01

    In addition to the intense campaign of replacement of the leaky bushing on the Endcap circuits, other important activities have also been completed, with the aim of enhancing the overall reliability of the cooling infrastructures at CMS. Remaining with the Endcap circuit, the regulating valve that supplies cold water to the primary side of the circuit heat-exchanger, is not well adapted in flow capability and a new part has been ordered, to be installed during a stop of LHC. The instrumentation monitoring of the refilling rate of the circuits has been enhanced and we can now detect leaks as small as 0.5 cc/sec, on circuits that have nominal flow rates of some 20 litres/sec. Another activity starting now that the technical stop is over is the collection of spare parts that are difficult to find on the market. These will be stored at P5 with the aim of reducing down-time in case of component failure. Concerning the ventilation infrastructures, it has been noticed that in winter time the relative humidity leve...

  13. A simulation model for reliability evaluation of Space Station power systems

    Science.gov (United States)

    Singh, C.; Patton, A. D.; Kumar, Mudit; Wagner, H.

    1988-01-01

    A detailed simulation model for the hybrid Space Station power system is presented which allows photovoltaic and solar dynamic power sources to be mixed in varying proportions. The model considers the dependence of reliability and storage characteristics during the sun and eclipse periods, and makes it possible to model the charging and discharging of the energy storage modules in a relatively accurate manner on a continuous basis.

  14. RELIABILITY OF THE ONE REPETITION-MAXIMUM POWER CLEAN TEST IN ADOLESCENT ATHLETES

    Science.gov (United States)

    Faigenbaum, Avery D.; McFarland, James E.; Herman, Robert; Naclerio, Fernando; Ratamess, Nicholas A.; Kang, Jie; Myer, Gregory D.

    2013-01-01

    Although the power clean test is routinely used to assess strength and power performance in adult athletes, the reliability of this measure in younger populations has not been examined. Therefore, the purpose of this study was to determine the reliability of the one repetition maximum (1 RM) power clean in adolescent athletes. Thirty-six male athletes (age 15.9 ± 1.1 yrs, body mass 79.1 ± 20.3 kg, height 175.1 ±7.4 cm) who had more than 1 year of training experience with weightlifting exercises performed a 1 RM power clean on two nonconsecutive days in the afternoon following standardized procedures. All test procedures were supervised by a senior level weightlifting coach and consisted of a systematic progression in test load until the maximum resistance that could be lifted for one repetition using proper exercise technique was determined. Data were analyzed using an intraclass correlation coefficient (ICC [2,k]), Pearson correlation coefficient (r), repeated measures ANOVA, Bland-Altman plot, and typical error analyses. Analysis of the data revealed that the test measures were highly reliable demonstrating a test-retest ICC of 0.98 (95% CI = 0.96–0.99). Testing also demonstrated a strong relationship between 1 RM measures on trial 1 and trial 2 (r=0.98, pinjuries occurred during the study period and the testing protocol was well-tolerated by all subjects. These findings indicate that 1 RM power clean testing has a high degree of reproducibility in trained male adolescent athletes when standardized testing procedures are followed and qualified instruction is present. PMID:22233786

  15. Reliability consideration of low-power-grid-tied inverter for photovoltaic application

    OpenAIRE

    Liu, J.; Henze, N.

    2009-01-01

    In recent years PV modules have been improved evidently. An excellent reliability has been validated corresponding to Mean Time between Failure (MTBF) between 500 and 6000 years respectively in commercial utility power systems. Manufactures can provide performance guarantees for PV modules at least for 20 years. If an average inverter lifetime of 5 years is assumed, it is evident that the overall reliability of PV systems [PVSs] with integrated inverter is determined chiefly by the inverter i...

  16. New design algorithm and reliability testing of solar powered near ...

    African Journals Online (AJOL)

    New design algorithm and reliability testing of solar powered near-space flight vehicle for defense and security. ... To overcome this problem, we propose a pseudo-satellite system where telecommunication devices are carried on a perpetually flying solar aircraft cruising at stratospheric altitude. Our aircraft will combine ...

  17. Reliability evaluation of nuclear power plants

    International Nuclear Information System (INIS)

    Rondiris, I.L.

    1978-10-01

    The research described in this thesis is concerned with the reliability/safety analysis of complex systems, such as nuclear power stations, basically using the event tree methodology. The thesis introduces and assesses a computational technique which applies the methodology to complex systems by simulating their topology and operational logic. The technique develops the system event tree and relates each branch of this tree to its qualitative and quantitative impact on specified system outcomes following an abnormal operating condition. Then, the thesis aims at deducing the critical failure modes of complex systems. This is achieved by a new technique for deducing the minimal cut or tie sets of various system outcomes. The technique is, furthermore, expanded to identify potential common mode failures and cut or tie sets containing dependent failures of some components. After dealing with the qualitative part of a reliability study, the thesis introduces two methods for calculating the probability of a component being either in the failure or in the partial failure state. The first method deals with revealed faults and makes use of the concept of Markov processes. The second one deals with unrevealed faults and can be used to calculate the relevant probability of component taking into account its inspection and replacement process. (author)

  18. Implementation of the project of equipment reliability in the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Rios O, J. E.; Martinez L, A. G.

    2008-01-01

    A equipment is reliable if it fulfills the function for which was designed and when it is required. To implement a project of reliability in a nuclear power plant this associate to a process of continuous analysis of the operation, of the conditions and faults of the equipment. The analysis of the operation of a system, of the equipment of the same faults and the parts that integrate to equipment take to identify the potential causes of faults. The predictive analysis on components and equipment allow to rectify and to establish guides to optimize the maintenance and to guarantee the reliability and function of the same ones. The reliability in the equipment is without place to doubts a wide project that embraces from the more small component of the equipment going by the proof of the parts of reserve, the operation conditions until the operative techniques of analysis. Without place of doubt for a nuclear power plant the taking of decisions based on the reliability of their systems and equipment will be the appropriate for to assure the operation and reliability of the same one. In this work would appear the project of reliability its processes, criteria, indicators action of improvement and the interaction of the different disciplines from the Nuclear Power Plant of Laguna Verde like a fundamental point for it put in operation. (Author)

  19. Procedure for conducting a human-reliability analysis for nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Bell, B.J.; Swain, A.D.

    1983-05-01

    This document describes in detail a procedure to be followed in conducting a human reliability analysis as part of a probabilistic risk assessment when such an analysis is performed according to the methods described in NUREG/CR-1278, Handbook for Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications. An overview of the procedure describing the major elements of a human reliability analysis is presented along with a detailed description of each element and an example of an actual analysis. An appendix consists of some sample human reliability analysis problems for further study

  20. Reliability Improvement of Power Converters by Means of Condition Monitoring of IGBT Modules

    DEFF Research Database (Denmark)

    Choi, Ui Min; Blaabjerg, Frede; Jørgensen, S.

    2017-01-01

    Power electronic systems have gradually gained an important status in a wide range of industrial applications such as renewable generation, motor drives, automotive, and railway transportation. Accordingly, recent research makes an effort to improve the reliability of power electronic systems...

  1. 76 FR 2369 - Priorities for Addressing Risks to the Reliability of the Bulk-Power System; Notice of Technical...

    Science.gov (United States)

    2011-01-13

    ... Addressing Risks to the Reliability of the Bulk- Power System; Notice of Technical Conference December 16.... The purpose of the conference is to discuss policy issues related to reliability of the Bulk-Power System, including priorities for addressing risks to reliability. The agenda for this conference will be...

  2. Power Cycling Test Method for Reliability Assessment of Power Device Modules in Respect to Temperature Stress

    DEFF Research Database (Denmark)

    Choi, Ui-Min; Blaabjerg, Frede; Jørgensen, Søren

    2018-01-01

    Power cycling test is one of the important tasks to investigate the reliability performance of power device modules in respect to temperature stress. From this, it is able to predict the lifetime of a component in power converters. In this paper, representative power cycling test circuits......, measurement circuits of wear-out failure indicators as well as measurement strategies for different power cycling test circuits are discussed in order to provide the current state of knowledge of this topic by organizing and evaluating current literature. In the first section of this paper, the structure...... of a conventional power device module and its related wear-out failure mechanisms with degradation indicators are discussed. Then, representative power cycling test circuits are introduced. Furthermore, on-state collector-emitter voltage (VCE ON) and forward voltage (VF) measurement circuits for wear-out condition...

  3. Reliability analysis of operator's monitoring behavior in digital main control room of nuclear power plants and its application

    International Nuclear Information System (INIS)

    Zhang Li; Hu Hong; Li Pengcheng; Jiang Jianjun; Yi Cannan; Chen Qingqing

    2015-01-01

    In order to build a quantitative model to analyze operators' monitoring behavior reliability of digital main control room of nuclear power plants, based on the analysis of the design characteristics of digital main control room of a nuclear power plant and operator's monitoring behavior, and combining with operators' monitoring behavior process, monitoring behavior reliability was divided into three parts including information transfer reliability among screens, inside-screen information sampling reliability and information detection reliability. Quantitative calculation model of information transfer reliability among screens was established based on Senders's monitoring theory; the inside screen information sampling reliability model was established based on the allocation theory of attention resources; and considering the performance shaping factor causality, a fuzzy Bayesian method was presented to quantify information detection reliability and an example of application was given. The results show that the established model of monitoring behavior reliability gives an objective description for monitoring process, which can quantify the monitoring reliability and overcome the shortcomings of traditional methods. Therefore, it provides theoretical support for operator's monitoring behavior reliability analysis in digital main control room of nuclear power plants and improves the precision of human reliability analysis. (authors)

  4. Reliability Analysis Study of Digital Reactor Protection System in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Guo, Xiao Ming; Liu, Tao; Tong, Jie Juan; Zhao, Jun

    2011-01-01

    The Digital I and C systems are believed to improve a plants safety and reliability generally. The reliability analysis of digital I and C system has become one research hotspot. Traditional fault tree method is one of means to quantify the digital I and C system reliability. Review of advanced nuclear power plant AP1000 digital protection system evaluation makes clear both the fault tree application and analysis process to the digital system reliability. One typical digital protection system special for advanced reactor has been developed, which reliability evaluation is necessary for design demonstration. The typical digital protection system construction is introduced in the paper, and the process of FMEA and fault tree application to the digital protection system reliability evaluation are described. Reliability data and bypass logic modeling are two points giving special attention in the paper. Because the factors about time sequence and feedback not exist in reactor protection system obviously, the dynamic feature of digital system is not discussed

  5. Efforts to improve safety and reliability of nuclear power plants in Kyushu Electric Power

    International Nuclear Information System (INIS)

    Yamamoto, Satoshi

    2014-01-01

    After the Fukushima accident, Kyushu Electric Power Co. took emergency safety measures requested by government to ensure power supply, coolant supply pumps and cooling water so as to keep cooling fuels in the reactor and spent fuel storage pool in case of losses of ordinary cooling capability caused by earthquake and tsunami. In order to improve safety and reliability of nuclear power plants, further efforts based on lessons learned from the Fukushima accident had been made to diversify corresponding equipment of safety measures in terms of prevention of core damage, prevention of containment failure, mitigation of radioactive materials release, cooling of spent fuel pit and ensurance of power supply, and to enhance emergency response capability so as to make operational management more complete. Additional safety measures applicable to new regulatory requirements against severe accidents were in progress. This article introduced details of such activities. (T. Tanaka)

  6. 75 FR 52528 - Mandatory Reliability Standards for the Bulk-Power System; Notice of Technical Conference

    Science.gov (United States)

    2010-08-26

    ...] Mandatory Reliability Standards for the Bulk-Power System; Notice of Technical Conference August 19, 2010... Order No. 693 the Commission approved Reliability Standard BAL-003-0 as mandatory and enforceable and directed the ERO to develop a modification to BAL-003-0 through the Reliability Standards development...

  7. Impact of Distributed Energy Resources on the Reliability of a Critical Telecommunications Facility

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, D.; Atcitty, C.; Zuffranieri, J.; Arent, D.

    2006-03-01

    Telecommunications has been identified by the Department of Homeland Security as a critical infrastructure to the United States. Failures in the power systems supporting major telecommunications service nodes are a main contributor to major telecommunications outages, as documented by analyses of Federal Communications Commission (FCC) outage reports by the National Reliability Steering Committee (under auspices of the Alliance for Telecommunications Industry Solutions). There are two major issues that are having increasing impact on the sensitivity of the power distribution to telecommunication facilities: deregulation of the power industry, and changing weather patterns. A logical approach to improve the robustness of telecommunication facilities would be to increase the depth and breadth of technologies available to restore power in the face of power outages. Distributed energy resources such as fuel cells and gas turbines could provide one more onsite electric power source to provide backup power, if batteries and diesel generators fail. But does the diversity in power sources actually increase the reliability of offered power to the office equipment, or does the complexity of installing and managing the extended power system induce more potential faults and higher failure rates? This report analyzes a system involving a telecommunications facility consisting of two switch-bays and a satellite reception system.

  8. Report on the seminar on supporting industrial infrastructure requirements and development for nuclear power, Vienna, 14-18 April, 1986

    International Nuclear Information System (INIS)

    1986-04-01

    The Seminar on Supporting Industrial Infrastructure Requirements and Development for Nuclear Power reviewed the following problem areas: establishing the programmatic objectives of a realistic national participation and the technology transfer which would be necessary to qualify such a participation; promoting the level of industrialization which would be necessary to attain the targeted national participation; assuring quality in industry by enforcing comprehensive QA programme; setting-up a national R and D infrastructure to assist the transfer of technology and act as a permanent asset to solve problems as they arise in industry

  9. Reliability and Sensitivity of the Power Push-up Test for Upper-Body Strength and Power in 6-15-Year-Old Male Athletes.

    Science.gov (United States)

    Gillen, Zachary M; Miramonti, Amelia A; McKay, Brianna D; Jenkins, Nathaniel D M; Leutzinger, Todd J; Cramer, Joel T

    2018-01-01

    Gillen, ZM, Miramonti, AA, McKay, BD, Jenkins, NDM, Leutzinger, TJ, and Cramer, JT. Reliability and sensitivity of the power push-up test for upper-body strength and power in 6-15-year-old male athletes. J Strength Cond Res 32(1): 83-96, 2018-The power push-up (PPU) test is an explosive upper-body test performed on a force plate and is currently being used in high school football combines throughout the United States. The purpose of this study was to quantify the reliability of the PPU test based on age and starting position (knees vs. toes) in young athletes. Sixty-eight boys (mean ± SD; age = 10.8 ± 2.0 years) were tested twice over 5 days. Boys were separated by age as 6-9 years (n = 16), 10-11 years (n = 26), and 12-15 years (n = 26). The PPU test was performed on a force plate while rotating from the knees vs. the toes. Measurements were peak force (PF, N), peak rate of force development (pRFD, N·s), average power (AP, W), and peak power (PP, W). Intraclass correlation coefficients (ICC2,1), SEMs, coefficients of variation (CVs), and minimum detectable changes (MDCs) were calculated to quantify reliability and sensitivity. Peak force from the knees in 10-15-year-olds, PF from the toes in 12-15-year-olds, and pRFD from the knees and toes in 12-15-year-olds were comparably reliable (ICC ≥ 0.84). Neither power measurements (AP or PP) for any age group, nor any measurements (PF, pRFD, AP, or PP) for the 6-9-year-olds were comparably reliable (ICC ≤ 0.74). When considering the reliable variables, PF was greater in the 12-15-year-olds than in 10-11-year-olds (p ≤ 0.05). In addition, in 12-15-year-olds, PF and pRFD were greater from the knees than from the toes (p ≤ 0.05). For reasons largely attributable to growth and development, the PPU test may be a reliable (ICC ≥ 0.80) and sensitive (CV ≤ 19%) measure of upper-body strength (PF), whereas pRFD was also reliable (ICC ≥ 0.80), but less sensitive (CV = 30-38%) in 10-15-year-old male athletes.

  10. EV Charging Infrastructure Roadmap

    International Nuclear Information System (INIS)

    Karner, Donald; Garetson, Thomas; Francfort, Jim

    2016-01-01

    As highlighted in the U.S. Department of Energy's EV Everywhere Grand Challenge, vehicle technology is advancing toward an objective to ''... produce plug-in electric vehicles that are as affordable and convenient for the average American family as today's gasoline-powered vehicles ...'' [1] by developing more efficient drivetrains, greater battery energy storage per dollar, and lighter-weight vehicle components and construction. With this technology advancement and improved vehicle performance, the objective for charging infrastructure is to promote vehicle adoption and maximize the number of electric miles driven. The EV Everywhere Charging Infrastructure Roadmap (hereafter referred to as Roadmap) looks forward and assumes that the technical challenges and vehicle performance improvements set forth in the EV Everywhere Grand Challenge will be met. The Roadmap identifies and prioritizes deployment of charging infrastructure in support of this charging infrastructure objective for the EV Everywhere Grand Challenge

  11. Improved Reliability of Single-Phase PV Inverters by Limiting the Maximum Feed-in Power

    DEFF Research Database (Denmark)

    Yang, Yongheng; Wang, Huai; Blaabjerg, Frede

    2014-01-01

    Grid operation experiences have revealed the necessity to limit the maximum feed-in power from PV inverter systems under a high penetration scenario in order to avoid voltage and frequency instability issues. A Constant Power Generation (CPG) control method has been proposed at the inverter level...... devices, allowing a quantitative prediction of the power device lifetime. A study case on a 3 kW single-phase PV inverter has demonstrated the advantages of the CPG control in terms of improved reliability.......Grid operation experiences have revealed the necessity to limit the maximum feed-in power from PV inverter systems under a high penetration scenario in order to avoid voltage and frequency instability issues. A Constant Power Generation (CPG) control method has been proposed at the inverter level....... The CPG control strategy is activated only when the DC input power from PV panels exceeds a specific power limit. It enables to limit the maximum feed-in power to the electric grids and also to improve the utilization of PV inverters. As a further study, this paper investigates the reliability performance...

  12. The reliability of integrated gasification combined cycle (IGCC) power generation units

    Energy Technology Data Exchange (ETDEWEB)

    Higman, C.; DellaVilla, S.; Steele, B. [Syngas Consultants Ltd. (United Kingdom)

    2006-07-01

    This paper presents two interlinked projects aimed at supporting the improvement of integrated gasification combined cycle (IGCC) reliability. The one project comprises the extension of SPS's existing ORAP (Operational Reliability Analysis Program) reliability, availability and maintainability (RAM) tracking technology from its existing base in natural gas open and combined cycle operations into IGCC. The other project is using the extended ORAP database to evaluate performance data from existing plants. The initial work has concentrated on evaluating public domain data on the performance of gasification based power and chemical plants. This is being followed up by plant interviews in some 20 plants to verify and expand the database on current performance. 23 refs., 8 figs., 2 tabs.

  13. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  14. On estimation of reliability of a nuclear power plant with tokamak reactor

    International Nuclear Information System (INIS)

    Klemin, A.I.; Smetannikov, V.P.; Shiverskij, E.A.

    1982-01-01

    The results of the analysis of INTOR plant reliability are presented. The first stage of the analysis consists in the calculation of the INTOR plant structural reliability factors (15 ibs main systems have been considered). For each system the failure flow parameter (W(1/h)) and operational readiness Ksub(r) have been determined which for the plant as a whole besides these factors-technological utilization coefficient Ksub(TU) and mean-cycles-between failures Tsub(o). The second stage of the reliability analysis consists in investigating methods of improving its reliability factors reratively to the one calculated at the first level stage. It is shown that the reliability of the whole plant to the most essential extent is determined by the power supply system reliability. The following as to the influence extent on the INTOR plant reliability is the cryogenic system. Calculations of the INTOR plant reliability factors have given the following values: W=4,5x10 -3 1/h. Tsub(o)=152 h, Ksub(r)=0,71, Ksub(TU)=o,4 g

  15. Reliability of high power electron accelerators for radiation processing

    Energy Technology Data Exchange (ETDEWEB)

    Zimek, Z. [Department of Radiation Chemistry and Technology, Institute of Nuclear Chemistry and Technology, Warsaw (Poland)

    2011-07-01

    Accelerators applied for radiation processing are installed in industrial facilities where accelerator availability coefficient should be at the level of 95% to fulfill requirements according to industry standards. Usually the exploitation of electron accelerator reviles the number of short and few long lasting failures. Some technical shortages can be overcome by practical implementation the experience gained in accelerator technology development by different accelerator manufactures. The reliability/availability of high power accelerators for application in flue gas treatment process must be dramatically improved to meet industrial standards. Support of accelerator technology dedicated for environment protection should be provided by governmental and international institutions to overcome accelerator reliability/availability problem and high risk and low direct profit in this particular application. (author)

  16. Reliability of high power electron accelerators for radiation processing

    International Nuclear Information System (INIS)

    Zimek, Z.

    2011-01-01

    Accelerators applied for radiation processing are installed in industrial facilities where accelerator availability coefficient should be at the level of 95% to fulfill requirements according to industry standards. Usually the exploitation of electron accelerator reviles the number of short and few long lasting failures. Some technical shortages can be overcome by practical implementation the experience gained in accelerator technology development by different accelerator manufactures. The reliability/availability of high power accelerators for application in flue gas treatment process must be dramatically improved to meet industrial standards. Support of accelerator technology dedicated for environment protection should be provided by governmental and international institutions to overcome accelerator reliability/availability problem and high risk and low direct profit in this particular application. (author)

  17. Cloud Infrastructure Security

    OpenAIRE

    Velev , Dimiter; Zlateva , Plamena

    2010-01-01

    Part 4: Security for Clouds; International audience; Cloud computing can help companies accomplish more by eliminating the physical bonds between an IT infrastructure and its users. Users can purchase services from a cloud environment that could allow them to save money and focus on their core business. At the same time certain concerns have emerged as potential barriers to rapid adoption of cloud services such as security, privacy and reliability. Usually the information security professiona...

  18. Evaluating system reliability and targeted hardening strategies of power distribution systems subjected to hurricanes

    International Nuclear Information System (INIS)

    Salman, Abdullahi M.; Li, Yue; Stewart, Mark G.

    2015-01-01

    Over the years, power distribution systems have been vulnerable to extensive damage from hurricanes which can cause power outage resulting in millions of dollars of economic losses and restoration costs. Most of the outage is as a result of failure of distribution support structures. Over the years, various methods of strengthening distribution systems have been proposed and studied. Some of these methods, such as undergrounding of the system, have been shown to be unjustified from an economic point of view. A potential cost-effective strategy is targeted hardening of the system. This, however, requires a method of determining critical parts of a system that when strengthened, will have greater impact on reliability. This paper presents a framework for studying the effectiveness of targeted hardening strategies on power distribution systems subjected to hurricanes. The framework includes a methodology for evaluating system reliability that relates failure of poles and power delivery, determination of critical parts of a system, hurricane hazard analysis, and consideration of decay of distribution poles. The framework also incorporates cost analysis that considers economic losses due to power outage. A notional power distribution system is used to demonstrate the framework by evaluating and comparing the effectiveness of three hardening measures. - Highlight: • Risk assessment of power distribution systems subjected to hurricanes is carried out. • Framework for studying effectiveness of targeted hardening strategies is presented. • A system reliability method is proposed. • Targeted hardening is cost effective for existing systems. • Economic losses due to power outage should be considered for cost analysis.

  19. Reliability program plan for the Kilowatt Isotope Power System (KIPS) technology verification phase

    International Nuclear Information System (INIS)

    1978-01-01

    Ths document is an integral part of the Kilowatt Isotope Power System (KIPS) Program Plan. This document defines the KIPS Reliability Program Plan for the Technology Verification Phase. This document delineates the reliability assurance tasks that are to be accomplished by Sundstrand and its suppliers during the design, fabrication and testing of the KIPS

  20. 2002 reliability report on the French power system; Bilan 2002 de la surete du systeme electrique francais

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    Ensuring the reliability of the power system is one of the main responsibilities entrusted to RTE, the French transmission system operator, by the Act of February 10, 2000. Reliability must be maintained, both now and in the future. This means that RTE is required to: ensure the normal operation of the power system, limit the number of incidents and avoid major incidents, limit the consequences of major incidents when they do occur. By publishing a yearly reliability report on the French power system, RTE is clearly showing its ambition to encourage long-term supervision of all aspects of system reliability development. By this approach, RTE's intention is to help develop a reliability culture, by all the actors concerned (both RTE and network users) more aware of their role in establishing reliability, and by promoting reliability issues and comparisons with international transmission system operator associations (UCTE , ETSO ). The annual reliability report is drawn up around the following themes: a broad overview of changes in the internal and external environment that have implications for reliability, developments in the various elements that make up the reliability referential during the course of the year, developments on measures aimed at promoting reliability, in terms of equipment, organisation and human resources, lessons learned from events that took place over the year, the presentation of reliability-related indicators, RTE's control loop, and the developments under way at present.

  1. Reliability of nondestructive testing of metal strength properties for power equipment

    International Nuclear Information System (INIS)

    Bugaj, N.V.; Lebedev, A.A.; Sharko, A.V.

    1985-01-01

    Ultrasonic control which is a constituent part of a complex control system which includes specimen-free (by hardness) tests, random breaking tests and acoustic measurements is stUdied for its reliability with respect to strength properties of power-equipment metal. Quantitative and alternative criteria are developed to estimate quality of elements for power-equipment according to results of metal strength properties. Acoustic control results are presented for ultimate strength in 12Kh1MF-steel

  2. Securing energy assets and infrastructure 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-06-15

    This report describes in detail the energy industry's challenges and solutions for protecting critical assets including oil and gas infrastructure, transmission grids, power plants, storage, pipelines, and all aspects of strategic industry assets. It includes a special section on cyber-terrorism and protecting control systems. Contents: Section I - Introduction; U.S Energy Trends; Vulnerabilities; Protection Measures. Section II - Sector-wise Vulnerabilities Assessments and Security Measures: Coal, Oil and Petroleum, Natural Gas, Electric Power, Cybersecurity and Control Systems, Key Recommendations; Section III - Critical Infrastructure Protection Efforts: Government Initiatives, Agencies, and Checklists.

  3. Performance of nuclear power plants and analysis of some factors affecting their operational reliability and economy

    International Nuclear Information System (INIS)

    Kozak, M.; Havel, S.

    1989-09-01

    In Czechoslovakia, there are eight WWER 440 type reactors in operation at present. Since their introduction into operation, nuclear power plants in Czechoslovakia have exhibited high reliability. In the paper, total parameters of reliability with an analysis of causes affecting negatively their annual utilization are presented. Existence of a computerized information system for acquisition, recording and evaluation of reliability-significant data from operation and its feedback to designers and manufacturers of nuclear power plant equipment and components is a basic requirement of a systematic assurance of the needed level of nuclear power plant reliability. The information system is used simultaneously also for realistic evaluation of aging of equipment and systems. Analysis of the state of equipment is important mainly in the final stage of the NPP during consideration of further extension of its service life. Environmental effects of the Czechoslovak NPPs are very low (favourable). It follows from comparison of annual dose equivalents of the Czechoslovak NPPs operational personnel with the foreign NPPs that the values recorded in Czechoslovakia belong to the lowest ones. In conclusion, some ways of assurance of operational safety and reliability of the Czechoslovak nuclear power plants including the role of the State regulatory body are briefly discussed. (author). 3 tabs

  4. A Survey on Infrastructure-Based Vehicular Networks

    Directory of Open Access Journals (Sweden)

    Cristiano M. Silva

    2017-01-01

    Full Text Available The infrastructure of vehicular networks plays a major role in realizing the full potential of vehicular communications. More and more vehicles are connected to the Internet and to each other, driving new technological transformations in a multidisciplinary way. Researchers in automotive/telecom industries and academia are joining their effort to provide their visions and solutions to increasingly complex transportation systems, also envisioning a myriad of applications to improve the driving experience and the mobility. These trends pose significant challenges to the communication systems: low latency, higher throughput, and increased reliability have to be granted by the wireless access technologies and by a suitable (possibly dedicated infrastructure. This paper presents an in-depth survey of more than ten years of research on infrastructures, wireless access technologies and techniques, and deployment that make vehicular connectivity available. In addition, we identify the limitations of present technologies and infrastructures and the challenges associated with such infrastructure-based vehicular communications, also highlighting potential solutions.

  5. Reliability analysis of self-supply system of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Kuklik, B.

    The results are summarized of the fault tree analysis of the V-1 power plant self-consumption system. The 6 kV busbars providing power for the main circulating pumps, the steam generator feed pumps and other important components including the 0.4 kV busbars are of the highest importance for nuclear safety. A fault tree analysis was also made of the emergency core cooling system of the reactor. Dangerous faults are defined and fault trees are developed. A brief description is given of the calculation algorithm for a digital computer. Some results are discussed. The calculated reliability of the emergency core cooling system is 10 5 years, of the 6 kV busbars it is 6.6x10 4 years. In case of a permanent or a long-term outage of the 220 kV stand-bye power supply, the system reliability is reduced to 7x10 2 years. (Z.M.)

  6. Intelligent Structural Health Management of Civil Infrastructure

    Science.gov (United States)

    2012-10-19

    The collapse of the I-35W Mississippi River Bridge in Minneapolis has spawned a growing interest in the : development of reliable techniques for evaluating the structural integrity of civil infrastructure. Current inspection : techniques tailored to ...

  7. Reliable control system for nuclear power plant

    International Nuclear Information System (INIS)

    Okamoto, Tetsuo; Miyazaki, Shiro

    1980-01-01

    The System 1100 for nuclear power plants is the measuring and control system which utilizes the features of the System 1100 for electric power market in addition to the results of nuclear instrumentation with EBS-ZN series, and it has the following features. The maintenance and inspection in operation are easy. The construction of control loops is made flexibly by the combination of modules. The construction of multi-variable control system using mainly feed forward control is easy. Such functions as the automatic switching of control modes can be included. The switching of manual and automatic operations is easy, and if some trouble occurred in a module, the manual operation can be made. The aseismatic ability is improved by rigid structure cubicles. Nonflammable materials are used for wires, multi-core cables, paints and printed boards. The anti-noise characteristics are improved, and the reliability is high. The policy of developing the System 1100 for nuclear power plants, the type approval tests on modules and units and the type approval test on the system are described. The items of the system type approval test were standard performance test, earthquake test, noise isolation test, temperature and humidity test, and drift test. The aseismatic cubicle showed good endurance in its vibration test. (Kako, I.)

  8. Reliability analysis of safety systems of nuclear power plant and utility experience with reliability safeguarding of systems during specified normal operation

    International Nuclear Information System (INIS)

    Balfanz, H.P.

    1989-01-01

    The paper gives an outline of the methods applied for reliability analysis of safety systems in nuclear power plant. The main tasks are to check the system design for detection of weak points, and to find possibilities of optimizing the strategies for inspection, inspection intervals, maintenance periods. Reliability safeguarding measures include the determination and verification of the broundary conditions of the analysis with regard to the reliability parameters and maintenance parameters used in the analysis, and the analysis of data feedback reflecting the plant response during operation. (orig.) [de

  9. Opening Address [Technical Meeting/Workshop on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for Nuclear Power Plants, Vienna (Austria), 24-27 January 2012

    International Nuclear Information System (INIS)

    Bychkov, A.V.

    2012-01-01

    Good morning, ladies and gentlemen. I would like to express my cordial welcome to the participants of the 6th annual workshop on nuclear power infrastructure since 2006. Looking back at the development of nuclear power programmes for embarking countries since 2006, I am glad to see that many embarking countries apply the IAEA Milestones approach and have made much progress, since several countries already have entered or entering into phase 3, the construction of the first nuclear power plant. Since the last annual workshop, the most shocking event was the accident in Fukushima Daiichi in March 2011, which was caused by an earthquake and tsunami of unprecedented severity. Looking at the impact of this accident on the nuclear power, there were speculations that the expansion in interest in nuclear power, which we had experienced in recent years, could come to an end. However, it is clear now that there will be continuous and significant growth in the use of nuclear power in the next two decades, although at a slower rate than in our previous projections. Most of the growth will occur in countries that already have operating nuclear power plants, such as China, India and Russia. In countries which are considering introducing nuclear power, interest remains strong, despite Fukushima Daiichi. Most of these countries are proceeding with plans to add nuclear power to their energy mix, with the Agency's assistance. Only a few countries cancelled or revised their plans, while others have taken a ''wait and see'' approach. However, the factors that contributed to increasing interest in nuclear power before the Fukushima Daiichi accident have not changed: these include increasing global demand for energy, as well as concerns about climate change, volatile fossil fuel prices and security of energy supply. The countries strongly committed to nuclear power such as the United Arab Emirates, Turkey, Belarus, Vietnam, Jordan, Bangladesh and Poland, keep the same position even

  10. A new mix of power for the ESO installations in Chile: greener, more reliable, cheaper

    Science.gov (United States)

    Filippi, G.; Tamai, R.; Kalaitzoglou, D.; Wild, W.; Delorme, A.; Rioseco, D.

    2016-07-01

    The highest sky quality demands for astronomical research impose to locate observatories often in areas not easily reached by the existing power infrastructures. At the same time, availability and cost of power is a primary factor for sustainable operations. Power may also be a potential source for CO2 pollution. As part of its green initiatives, ESO is in the process of replacing the power sources for its own, La Silla and Paranal-Armazones, and shared, ALMA, installations in Chile in order to provide them with more reliable, affordable, and smaller CO2 footprint power solutions. The connectivity to the Chilean interconnected power systems (grid) which is to extensively use Non-Conventional Renewable Energy (NCRE) as well as the use of less polluting fuels wherever self-generation cannot be avoided are key building blocks for the solutions selected for every site. In addition, considerations such as the environmental impact and - if required - the partnership with other entities have also to be taken into account. After years of preparatory work to which the Chilean Authorities provided great help and support, ESO has now launched an articulated program to upgrade the existing agreements/facilities in i) the La Silla Observatory, from free to regulated grid client status due to an agreement with a Solar Farm private initiative, in ii) the Paranal-Armazones Observatory, from local generation using liquefied petroleum gas (LPG) to connection to the grid which is to extensively use NCRE, and last but not least, in iii) the ALMA Observatory where ESO participates together with North American and East Asian partners, from replacing the LPG as fuel for the turbine local generation system with the use of less polluting natural gas (NG) supplied by a pipe connection to eliminate the pollution caused by the LPG trucks (currently 1 LPG truck from the VIII region, Bio Bio, to the II region, ALMA and back every day, for a total of 3000km). The technologies used and the status

  11. Integrated Nuclear Infrastructure Review (INIR) Missions: The First Six Years

    International Nuclear Information System (INIS)

    2015-12-01

    IAEA Integrated Nuclear Infrastructure Review (INIR) missions are designed to assist Member States in evaluating the status of their national infrastructure for the introduction of a nuclear power programme. INIR missions are conducted upon request from the Member State. Each INIR mission is coordinated and led by the IAEA and conducted by a team of IAEA staff and international experts drawn from Member States which have experience in different aspects of developing and deploying nuclear infrastructure. INIR missions cover the 19 infrastructure issues described in Milestones in the Development of a National Infrastructure for Nuclear Power, IAEA Nuclear Energy Series No. NG-G-3.1, published in 2007 and revised in 2015, and the assessment is based on an analysis of a self-evaluation report prepared by the Member State, a review of the documents it provides and interviews with its key officials. Phase 1 INIR missions evaluate the status of the infrastructure to achieve Milestone 1 (Ready to make a knowledgeable commitment to a nuclear power programme). Phase 2 INIR missions evaluate the status of the infrastructure to achieve Milestone 2 (Ready to invite bids/negotiate a contract for the first nuclear power plant). From 2009 to 2014, 14 IAEA INIR missions and follow-ups were conducted in States embarking on a nuclear power programme and one State expanding its programme. During this time, considerable experience was gained by the IAEA on the conduct of INIR missions, and this feedback has been used to continually improve the overall INIR methodology. The INIR methodology has thus evolved and is far more comprehensive today than in 2009. Despite the limited number of INIR missions conducted, some common findings were identified in Member States embarking on nuclear power programmes. This publication summarizes the results of the missions and highlights the most significant areas in which recommendations were made

  12. Investment opportunities in infrastructure regardless of financial crisis

    OpenAIRE

    ILIE Georgeta

    2009-01-01

    During these times of dramatic change and financial market disorder, the challenge of infrastructure development is being drawn more into the highlight. Infrastructure will be rising in importance over the next years. The availability and quality of infrastructure directly affect where business operations are located and expanded. In this context, roads and power generation are the most urgent infrastructure needs. The paper reveals a few economic characteristics of current stage of infrastru...

  13. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  14. Hybrid biomass-wind power plant for reliable energy generation

    International Nuclear Information System (INIS)

    Perez-Navarro, A.; Alfonso, D.; Alvarez, C.; Ibanez, F.; Sanchez, C.; Segura, I.

    2010-01-01

    Massive implementation of renewable energy resources is a key element to reduce CO 2 emissions associated to electricity generation. Wind resources can provide an important alternative to conventional electricity generation mainly based on fossil fuels. However, wind generators are greatly affected by the restrictive operating rules of electricity markets because, as wind is naturally variable, wind generators may have serious difficulties on submitting accurate generation schedules on a day ahead basis, and on complying with scheduled obligations in real-time operation. In this paper, an innovative system combining a biomass gasification power plant, a gas storage system and stand-by generators to stabilize a generic 40 MW wind park is proposed and evaluated with real data. The wind park power production model is based on real data about power production of a Spanish wind park and a probabilistic approach to quantify fluctuations and so, power compensation needs. The hybrid wind-biomass system is analysed to obtain main hybrid system design parameters. This hybrid system can mitigate wind prediction errors and so provide a predictable source of electricity. An entire year cycle of hourly power compensations needs has been simulated deducing storage capacity, extra power needs of the biomass power plant and stand-by generation capacity to assure power compensation during critical peak hours with acceptable reliability. (author)

  15. EV Charging Infrastructure Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Karner, Donald [Electric Transportation Inc., Rogers, AR (United States); Garetson, Thomas [Electric Transportation Inc., Rogers, AR (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-08-01

    As highlighted in the U.S. Department of Energy’s EV Everywhere Grand Challenge, vehicle technology is advancing toward an objective to “… produce plug-in electric vehicles that are as affordable and convenient for the average American family as today’s gasoline-powered vehicles …” [1] by developing more efficient drivetrains, greater battery energy storage per dollar, and lighter-weight vehicle components and construction. With this technology advancement and improved vehicle performance, the objective for charging infrastructure is to promote vehicle adoption and maximize the number of electric miles driven. The EV Everywhere Charging Infrastructure Roadmap (hereafter referred to as Roadmap) looks forward and assumes that the technical challenges and vehicle performance improvements set forth in the EV Everywhere Grand Challenge will be met. The Roadmap identifies and prioritizes deployment of charging infrastructure in support of this charging infrastructure objective for the EV Everywhere Grand Challenge

  16. 76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard

    Science.gov (United States)

    2011-04-28

    ... have an operating plan and facilities for backup functionality to ensure Bulk-Power System reliability... entity's primary control center on the reliability of the Bulk-Power System. \\1\\ Mandatory Reliability... potential impact of a violation of the Requirement on the reliability of the Bulk-Power System. The...

  17. Early operating and reliability experience with the CEBAF DC magnet power supplies

    International Nuclear Information System (INIS)

    Merz, W.; Flood, R.; Martin, E.J.; O'Sullivan, M.

    1996-01-01

    The CEBAF accelerator is a five pass, recirculating, CW electron linear accelerator. There are a total of nine recirculation arcs connecting the two linacs. Three experimental halls are serviced by the accelerator through separate transport channels. The magnet powering system for CEBAF consists of approximately 2000 independent control channels. About 1850 of these channels are low current, trim magnet power supplies. There are 28 higher power supplies used to energize the major bending elements. Over one hundred, 20 amp, active shunts are used to vary current in selected magnets in the major dipole strings. The majority of the magnetic elements are concentrated in the arcs and transport channels. The correction dipoles, quadrupoles and sextupoles are each powered individually be a dedicated trim power supply channel. The arc and extraction channel dipoles are powered in series strings by the high powered supplies, known locally at CEBAF as 'box power supplies'. Arc loads consist of some 30--40 magnets in series. Transport channel, path length control doglegs and septa box power supplies have loads ranging from 1 to 10 magnets. Shunts are installed on virtually all loads where two or more magnets are in series. At this time, 95% of the power supplies are installed and commissioned. In the past twelve months, beginning in May 1994, approximately 1200 trim magnet power supplies have been checked out. During this same period approximately 22 box power supplies and 100 shunts have been made operational. Full operation of the equipment has only been under way since early 1995. While this operation is only just beginning, much has been learned based on the reliability performance seen so far. The remainder of this paper describes the systems mentioned, their reliability problems, the fixes implemented to date, and some plans for the future. 6 refs., 3 tabs

  18. Improvement of infrastructure for risk-informed regulation

    International Nuclear Information System (INIS)

    2012-01-01

    Improvement of the infrastructure of probabilistic safety assessment (PSA) is essential to the risk-informed regulation for nuclear power plants. JNES conducted update of initiating event frequencies and improvement of the method for uncertainty analysis to enhance the technology bases of PSA in 2011. Furthermore, JNES improved the human reliability analysis method and the reliability analysis method for digital reactor protection systems. JNES estimated initiating event frequencies both for power and shutdown operation based on the recent operating experiences in Nuclear Power Plants (NPPs) of Japan using the hierarchical Bayesian method. As for improvement of the uncertainty analysis method, JNES conducted trial analyses using SOKC (State-Of-Knowledge Correlation) for the representative PWR plant and BWR plant of Japan. The study on the advanced HRA method with operator cognitive action model was conducted to improve a quality of HRA. The study on analyses of 'defense in depth' and 'diversity' for introducing digital instrumentation and control (I and C) systems was conducted. In order to ensure the quality of PSA, JNES conducted a peer review of a representative Japanese BWR plant PSA by the professional PSA engineers from the U.S. in order to extract to improve quality of PSA, and made an effort to develop the procedures of internal fire PSA. JNES participated in OECD/NEA PRISME and FIRE project to obtain the latest information and data to validate and improve the fire propagation analysis codes and the parameters for fire PSA as well. Furthermore, JNES studied schemes for the endorsement and application in the risk-informed regulation of PSA standards established by Atomic Energy Society of Japan. (author)

  19. Reliability evaluation of power supply and distribution for special heat removal systems in nuclear power stations

    International Nuclear Information System (INIS)

    Jazbec, D.

    1982-01-01

    An example of the power supply and distribution of a Special Emergency Heat Removal System (SEHR) shows how an engineering organization may, with the aid of the analytical method of min-cut sets optimize the system reliability. Herein are given the necessary simple calculation methods. (Auth.)

  20. Infrastructure development through civil nuclear cooperation

    International Nuclear Information System (INIS)

    Humphrey, A.M.; Burkart, A.R.

    2010-01-01

    Due to growing concerns over electricity demand, energy security, and climate change, numerous countries are considering the construction of new nuclear power plants. Most of these will be built in nations with existing nuclear power programs, but an increasing number of States have expressed serious interest in developing new nuclear power programs. These countries will be faced with many challenges in establishing the robust infrastructures necessary for the safe, secure, and safeguarded deployment of nuclear power. Fortunately, there is much a State can gain through cooperation with other States with more developed programs. By sharing information on previous experience and established best practices, an emerging nuclear energy State can benefit from the lessons learned by its partners. Through a broad range of civil nuclear cooperation, the United States is helping new entrants develop the sound infrastructure necessary to deploy nuclear power plants with the highest standards of safety, security, and nonproliferation

  1. A reliability centered maintenance model applied to the auxiliary feedwater system of a nuclear power plant

    International Nuclear Information System (INIS)

    Araujo, Jefferson Borges

    1998-01-01

    The main objective of maintenance in a nuclear power plant is to assure that structures, systems and components will perform their design functions with reliability and availability in order to obtain a safety and economic electric power generation. Reliability Centered Maintenance (RCM) is a method of systematic review to develop or optimize Preventive Maintenance Programs. This study presents the objectives, concepts, organization and methods used in the development of RCM application to nuclear power plants. Some examples of this application are included, considering the Auxiliary Feedwater System of a generic two loops PWR nuclear power plant of Westinghouse design. (author)

  2. Electrical Market Management Considering Power System Constraints in Smart Distribution Grids

    Directory of Open Access Journals (Sweden)

    Poria Hasanpor Divshali

    2016-05-01

    Full Text Available Rising demand, climate change, growing fuel costs, outdated power system infrastructures, and new power generation technologies have made renewable distribution generators very attractive in recent years. Because of the increasing penetration level of renewable energy sources in addition to the growth of new electrical demand sectors, such as electrical vehicles, the power system may face serious problems and challenges in the near future. A revolutionary new power grid system, called smart grid, has been developed as a solution to these problems. The smart grid, equipped with modern communication and computation infrastructures, can coordinate different parts of the power system to enhance energy efficiency, reliability, and quality, while decreasing the energy cost. Since conventional distribution networks lack smart infrastructures, much research has been recently done in the distribution part of the smart grid, called smart distribution grid (SDG. This paper surveys contemporary literature in SDG from the perspective of the electricity market in addition to power system considerations. For this purpose, this paper reviews current demand side management methods, supply side management methods, and electrical vehicle charging and discharging techniques in SDG and also discusses their drawbacks. We also present future research directions to tackle new and existing challenges in the SDG.

  3. Infrastructural relations: Water, political power and the rise of a new 'despotic regime'

    Directory of Open Access Journals (Sweden)

    Veronica Strang

    2016-06-01

    Full Text Available It is 60 years since Karl Wittfogel highlighted a key relationship between political power and the ownership and control of water. Subsequent studies have suggested, commensurately, that exclusion from the ownership of essential resources represents a fundamental form of disenfranchisement – a loss of democratic involvement in societal direction. Several areas of theoretical development have illuminated these issues. Anthropologists have explored the recursive relationship between political arrangements and cosmological belief systems. Narrow legal definitions of property have been challenged through the consideration of more diverse ways of owning and controlling resources. Analyses of material culture have shown how it extends human agency, as well as having agentive capacities itself; and explorations of infrastructures have highlighted their role in composing socio-technical and political relations. Such approaches are readily applied to water and the material culture through which it is controlled and used. Drawing on historical and ethnographic research on water in Australia and the UK, this paper traces changing relationships between cosmological beliefs, infrastructure and political arrangements over time. It suggests that a current trend towards privatised, transnational water ownership potentially opens the door to the emergence of new 'despotic regimes'.

  4. Reliability analysis of meteorological data registered during nuclear power plant normal operation

    International Nuclear Information System (INIS)

    Amado, V.; Ulke, A.; Marino, B.; Thomas, L.

    2011-01-01

    The atmosphere is the environment in which gaseous radioactive discharges from nuclear power plants are transported. It is therefore essential to have reliable meteorological information to characterize the dispersion and feed evaluation models and radiological environmental impact during normal operation of the plant as well as accidental releases. In this way it is possible to determine the effects on the environment and in humans. The basic data needed to represent adequately the local weather include air temperature, wind speed and direction, rainfall, humidity and pressure. On the other hand, specific data consistent with the used model is required to determine the turbulence, for instance, radiation, cloud cover and vertical temperature gradient. It is important that the recorded data are representative of the local meteorology. This requires, first, properly placed instruments, that should be kept in operation and undergoing maintenance on a regular basis. Second, but equally substantial, a thorough analysis of its reliability must be performed prior to storage and/or data processing. In this paper we present the main criteria to consider choosing the location of a meteorological tower in the area of a nuclear power plant and propose a methodology for assessing the reliability of recorded data. The methodology was developed from the analysis of meteorological data registered in nuclear power plants in Argentina. (authors) [es

  5. Reliable high-power diode lasers: thermo-mechanical fatigue aspects

    Science.gov (United States)

    Klumel, Genady; Gridish, Yaakov; Szafranek, Igor; Karni, Yoram

    2006-02-01

    High power water-cooled diode lasers are finding increasing demand in biomedical, cosmetic and industrial applications, where repetitive cw (continuous wave) and pulsed cw operation modes are required. When operating in such modes, the lasers experience numerous complete thermal cycles between "cold" heat sink temperature and the "hot" temperature typical of thermally equilibrated cw operation. It is clearly demonstrated that the main failure mechanism directly linked to repetitive cw operation is thermo-mechanical fatigue of the solder joints adjacent to the laser bars, especially when "soft" solders are used. Analyses of the bonding interfaces were carried out using scanning electron microscopy. It was observed that intermetallic compounds, formed already during the bonding process, lead to the solders fatigue both on the p- and n-side of the laser bar. Fatigue failure of solder joints in repetitive cw operation reduces useful lifetime of the stacks to hundreds hours, in comparison with more than 10,000 hours lifetime typically demonstrated in commonly adopted non-stop cw reliability testing programs. It is shown, that proper selection of package materials and solders, careful design of fatigue sensitive parts and burn-in screening in the hard pulse operation mode allow considerable increase of lifetime and reliability, without compromising the device efficiency, optical power density and compactness.

  6. Cyber and physical infrastructure interdependencies.

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Laurence R.; Kelic, Andjelka; Warren, Drake E.

    2008-09-01

    The goal of the work discussed in this document is to understand the risk to the nation of cyber attacks on critical infrastructures. The large body of research results on cyber attacks against physical infrastructure vulnerabilities has not resulted in clear understanding of the cascading effects a cyber-caused disruption can have on critical national infrastructures and the ability of these affected infrastructures to deliver services. This document discusses current research and methodologies aimed at assessing the translation of a cyber-based effect into a physical disruption of infrastructure and thence into quantification of the economic consequences of the resultant disruption and damage. The document discusses the deficiencies of the existing methods in correlating cyber attacks with physical consequences. The document then outlines a research plan to correct those deficiencies. When completed, the research plan will result in a fully supported methodology to quantify the economic consequences of events that begin with cyber effects, cascade into other physical infrastructure impacts, and result in degradation of the critical infrastructure's ability to deliver services and products. This methodology enables quantification of the risks to national critical infrastructure of cyber threats. The work addresses the electric power sector as an example of how the methodology can be applied.

  7. A probabilistic approach to safety/reliability of space nuclear power systems

    International Nuclear Information System (INIS)

    Medford, G.; Williams, K.; Kolaczkowski, A.

    1989-01-01

    An ongoing effort is investigating the feasibility of using probabilistic risk assessment (PRA) modeling techniques to construct a living model of a space nuclear power system. This is being done in conjunction with a traditional reliability and survivability analysis of the SP-100 space nuclear power system. The initial phase of the project consists of three major parts with the overall goal of developing a top-level system model and defining initiating events of interest for the SP-100 system. The three major tasks were performing a traditional survivability analysis, performing a simple system reliability analysis, and constructing a top-level system fault-tree model. Each of these tasks and their interim results are discussed in this paper. Initial results from the study support the conclusion that PRA modeling techniques can provide a valuable design and decision-making tool for space reactors. The ability of the model to rank and calculate relative contributions from various failure modes allows design optimization for maximum safety and reliability. Future efforts in the SP-100 program will see data development and quantification of the model to allow parametric evaluations of the SP-100 system. Current efforts have shown the need for formal data development and test programs within such a modeling framework

  8. The use of reliability analysis techniques applied to nuclear power station emergency core cooling systems

    International Nuclear Information System (INIS)

    Danielsen, A.; Snaith, E.R.

    1975-01-01

    A reliability investigation carried out by the Safety and Reliability Services of the UKAEA, and the SSEB, of the essential system/reactor coolant system for a large nuclear power station is described. In AGR type reactors, after all reactor shutdown conditions, it is necessary to restore forced gas circulation and sufficient boiler feed to maintain the heat removal capacity of the boilers. The coolant requirements are provided by several independent mechanical systems of primary coolant fans, feedwater pumps, and valves integrated with electrical power sources, switchgear, and automatic control equipment. Reliability is treated as one aspect of system performance and quantified in terms of failure to meet a specific objective. Based on the reliability performance of the constituent components the optimum system configuration is determined together with the preferred plant operating procedures and maintenance requirements. (author)

  9. Integrating renewable energy sources in the Portuguese power system

    International Nuclear Information System (INIS)

    Martins, Nuno; Cabral, Pedro; Azevedo, Helena

    2012-01-01

    The integration of large amounts of renewable energy is an important challenge for the future management of electric systems, since it affects the operation of the electric power system and the design of the transmission and distribution network infrastructure. This is specially due to the connection requirements of the renewable energy technologies, to the extension and adjustment of the grid infrastructure and to the identification of new solutions for operational reserve, in order to maintain the overall system flexibility and security. In this paper, the impact of high penetration of intermittent energy sources, expected in long term in the Portuguese Power System, is analysed and the operational reserve requirements to accomplish a reliable and reasonable electrical energy supply are identified. It was concluded that pumped storage power plants, special power plants with regulating capabilities, will have an important task to provide the operational reserve requirements of the Portuguese Power System. This technology assumes a fundamental role not only to ensure the adequate levels of security of supply but also to allow the maximum exploitation of the installed capacity in renewable energy sources. (authors)

  10. Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

    International Nuclear Information System (INIS)

    Touati, Said; Chennai, Salim; Souli, Aissa

    2015-01-01

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

  11. Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

    Energy Technology Data Exchange (ETDEWEB)

    Touati, Said; Chennai, Salim; Souli, Aissa [Nuclear Research Centre of Birine, Ain Oussera, Djelfa Province (Algeria)

    2015-07-01

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

  12. A Simple and Reliable Method of Design for Standalone Photovoltaic Systems

    Science.gov (United States)

    Srinivasarao, Mantri; Sudha, K. Rama; Bhanu, C. V. K.

    2017-06-01

    Standalone photovoltaic (SAPV) systems are seen as a promoting method of electrifying areas of developing world that lack power grid infrastructure. Proliferations of these systems require a design procedure that is simple, reliable and exhibit good performance over its life time. The proposed methodology uses simple empirical formulae and easily available parameters to design SAPV systems, that is, array size with energy storage. After arriving at the different array size (area), performance curves are obtained for optimal design of SAPV system with high amount of reliability in terms of autonomy at a specified value of loss of load probability (LOLP). Based on the array to load ratio (ALR) and levelized energy cost (LEC) through life cycle cost (LCC) analysis, it is shown that the proposed methodology gives better performance, requires simple data and is more reliable when compared with conventional design using monthly average daily load and insolation.

  13. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Science.gov (United States)

    2011-04-26

    ....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... Reliability Standards for the Bulk-Power System. Action: FERC-725A. OMB Control No.: 1902-0244. Respondents...] Electric Reliability Organization Interpretation of Transmission Operations Reliability AGENCY: Federal...

  14. Guide to the collection and presentation of electrical, electronic, and sensing component reliability data for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This Guide is intended to establish a method of collecting and presenting reliability data for quantitative systematic reliability analysis in nuclear power generating stations, as outlined in IEEE Std 351-1975. Appendix D, which is not a part of IEEE Std 500-1977 but which comprises the bulk of this publication, presents tables of reliability data for nuclear power generating stations, intended for use of nuclear systems reliability analysts or design engineers

  15. Design of fuel cell powered data centers for sufficient reliability and availability

    Science.gov (United States)

    Ritchie, Alexa J.; Brouwer, Jacob

    2018-04-01

    It is challenging to design a sufficiently reliable fuel cell electrical system for use in data centers, which require 99.9999% uptime. Such a system could lower emissions and increase data center efficiency, but the reliability and availability of such a system must be analyzed and understood. Currently, extensive backup equipment is used to ensure electricity availability. The proposed design alternative uses multiple fuel cell systems each supporting a small number of servers to eliminate backup power equipment provided the fuel cell design has sufficient reliability and availability. Potential system designs are explored for the entire data center and for individual fuel cells. Reliability block diagram analysis of the fuel cell systems was accomplished to understand the reliability of the systems without repair or redundant technologies. From this analysis, it was apparent that redundant components would be necessary. A program was written in MATLAB to show that the desired system reliability could be achieved by a combination of parallel components, regardless of the number of additional components needed. Having shown that the desired reliability was achievable through some combination of components, a dynamic programming analysis was undertaken to assess the ideal allocation of parallel components.

  16. A Reliable, Non-Invasive Approach to Data Center Monitoring and Management

    Directory of Open Access Journals (Sweden)

    Moises Levy

    2017-08-01

    Full Text Available Recent standards, legislation, and best practices point to data center infrastructure management systems to control and monitor data center performance. This work presents an innovative approach to address some of the challenges that currently hinder data center management. It explains how monitoring and management systems should be envisioned and implemented. Key parameters associated with data center infrastructure and information technology equipment can be monitored in real-time across an entire facility using low-cost, low-power wireless sensors. Given the data centers’ mission critical nature, the system must be reliable and deployable through a non-invasive process. The need for the monitoring system is also presented through a feedback control systems perspective, which allows higher levels of automation. The data center monitoring and management system enables data gathering, analysis, and decision-making to improve performance, and to enhance asset utilization.

  17. A sociotechnical framework for understanding infrastructure breakdown and repair

    Energy Technology Data Exchange (ETDEWEB)

    Sims, Benjamin H [Los Alamos National Laboratory

    2009-01-01

    This paper looks at how and why infrastructure is repaired. With a new era of infrastructure spending underway, policymakers need to understand and anticipate the particular technical and political challenges posed by infrastructure repair. In particular, as infrastructure problems are increasingly in the public eye with current economic stimulus efforts, the question has increasingly been asked: why has it been so difficult for the United Statesto devote sustained resources to maintaining and upgrading its national infrastructure? This paper provides a sociotechnical framework for understanding the challenges of infrastructure repair, and demonstrates this framework using a case study of seismic retrofit of freeway bridges in California. The design of infrastructure is quite different from other types of design work even when new infrastructure is being designed. Infrastructure projects are almost always situated within, and must work with, existing infrastructure networks. As a result, compared to design of more discrete technological artifacts, the design of infrastructure systems requires a great deal of attention to interfaces as well as adaptation of design to the constraints imposed by existing systems. Also, because of their scale, infrastructural technologies engage with social life at a level where explicit political agendas may playa central role in the design process. The design and building of infrastructure is therefore often an enormously complex feat of sociotechnical engineering, in which technical and political agendas are negotiated together until an outcome is reached that allows the project to move forward. These sociotechnical settlements often result in a complex balancing of powerful interests around infrastructural artifacts; at the same time, less powerful interests have historically often been excluded or marginalized from such settlements.

  18. Determination of the Reliability Function of Nonredundant Element of Power Object

    International Nuclear Information System (INIS)

    Namgaladze, D.; Kiziria, T.

    2007-01-01

    At considering the reliability indices of the system element with recovery, the time of operation and recovery is usually accounted for. But, in practice, there often occur the situations when, after the failure of the system (or its element), it takes considerable time to begin repairing (time for revealing the damages, time for organization of repairing work, delivery of spare parts etc.). The total dead time is called the waiting time. In the present work, the reliability indices of the element of power object with account for the waiting time are determined analytically by using Markovian processes. (author)

  19. Design for Reliability and Robustness Tool Platform for Power Electronic Systems – Study Case on Motor Drive Applications

    DEFF Research Database (Denmark)

    Vernica, Ionut; Wang, Huai; Blaabjerg, Frede

    2018-01-01

    Because of the high cost of failure, the reliability performance of power semiconductor devices is becoming a more and more important and stringent factor in many energy conversion applications. Thus, the need for appropriate reliability analysis of the power electronics emerges. Due to its...

  20. Nuclear power plants. Guidelines to ensure quality of collected data on reliability

    International Nuclear Information System (INIS)

    1983-01-01

    This international standard lays down guidelines to be followed in the collection of data relative to nuclear power plants so as to ensure the reliability and completeness of the data and its insertion in a computerized system

  1. 76 FR 23171 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2011-04-26

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g...-Power System reliability may request an interpretation of a Reliability Standard.\\7\\ The ERO's standards... information in its reliability assessments. The Reliability Coordinator must monitor Bulk Electric System...

  2. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  3. Reliability analysis of an LCL tuned track segmented bi-directional inductive power transfer system

    DEFF Research Database (Denmark)

    Asif Iqbal, S. M.; Madawala, U. K.; Thrimawithana, D. J.

    2013-01-01

    Bi-directional Inductive Power Transfer (BDIPT) technique is suitable for renewable energy based applications such as electric vehicles (EVs), for the implementation of vehicle-to-grid (V2G) systems. Recently, more efforts have been made by researchers to improve both efficiency and reliability...... of renewable energy systems to further enhance their economical sustainability. This paper presents a comparative reliability study between a typical BDIPT system and an individually controlled segmented BDIPT system. Steady state thermal simulation results are provided for different output power levels...... for a 1.5 kW BDIPT system in a MATLAB/Simulink environment. Reliability parameters such as failure rate and mean time between failures (MTBF) are compared between the two systems. A nonlinear programming (NP) model is developed for optimizing charging schedule for a stationery EV. A case study of EV...

  4. Proliferation risks from nuclear power infrastructure

    Science.gov (United States)

    Squassoni, Sharon

    2017-11-01

    Certain elements of nuclear energy infrastructure are inherently dual-use, which makes the promotion of nuclear energy fraught with uncertainty. Are current restraints on the materials, equipment, and technology that can be used either to produce fuel for nuclear electricity generation or material for nuclear explosive devices adequate? Technology controls, supply side restrictions, and fuel market assurances have been used to dissuade countries from developing sensitive technologies but the lack of legal restrictions is a continued barrier to permanent reduction of nuclear proliferation risks.

  5. Multilevel Control System of Regional Power Consumption: Analysis of Infrastructure Elements Interconnections, Efficiency Evaluation

    Directory of Open Access Journals (Sweden)

    Marina Nikolaevna Myznikova

    2016-10-01

    Full Text Available Fundamental strategic programs in the spheres of power and economics adopted at various levels of management, are not always capable to solve the problem of power efficiency. The changes of systemic connections of economy and power elements are one of the basic problems of management at the regional level. The development of market relations has caused the growth of uncertainty factors at all levels of power consumption management. An insufficient estimation of system infrastructural interrelations and an individualization of organizational-economic relations of economic subjects and their localization, have generated the intersystem conflictness in distribution of power resources and have aggravated the problem of estimating power consumption efficiency at a systemic level. The restriction of application of the traditional management methods based on the principles of technological efficiency of the processes of energy manufacture and consumption, is connected with the information ruptures caused by the growth of factors of uncertainty and inconsistency of efficiency criteria. Application of modern methods of power consumption forecasting has a number of essential restrictions. At the present stage the management of power consumption in multilevel systems is aimed at realisation of system integrity and economic coordination of manufacture elements, transfer and consumption at regional level and demands working out of the new effective management methods based on the analysis of system interrelations. Allocation of system interrelations depends on features of development of electropower sector, active and passive elements of the structure of consumption, power balance. The analysis and estimation of interrelations of power and economic sphere allow to improve methodology of management of power consumption at the regional level in the conditions of uncertainty.

  6. Modeling cascading failures in interdependent infrastructures under terrorist attacks

    International Nuclear Information System (INIS)

    Wu, Baichao; Tang, Aiping; Wu, Jie

    2016-01-01

    An attack strength degradation model has been introduced to further capture the interdependencies among infrastructures and model cascading failures across infrastructures when terrorist attacks occur. A medium-sized energy system including oil network and power network is selected for exploring the vulnerabilities from independent networks to interdependent networks, considering the structural vulnerability and the functional vulnerability. Two types of interdependencies among critical infrastructures are involved in this paper: physical interdependencies and geographical interdependencies, shown by tunable parameters based on the probabilities of failures of nodes in the networks. In this paper, a tolerance parameter α is used to evaluation of the overloads of the substations based on power flow redistribution in power transmission systems under the attack. The results of simulation show that the independent networks or interdependent networks will be collapsed when only a small fraction of nodes are attacked under the attack strength degradation model, especially for the interdependent networks. The methodology introduced in this paper with physical interdependencies and geographical interdependencies involved in can be applied to analyze the vulnerability of the interdependent infrastructures further, and provides the insights of vulnerability of interdependent infrastructures to mitigation actions for critical infrastructure protections. - Highlights: • An attack strength degradation model based on the specified locations has been introduced. • Interdependencies considering both physical and geographical have been analyzed. • The structural vulnerability and the functional vulnerability have been considered.

  7. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Science.gov (United States)

    2011-09-20

    ....C. Cir. 2009). \\4\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC... for maintaining real and reactive power balance. \\14\\ Electric Reliability Organization Interpretation...; Order No. 753] Electric Reliability Organization Interpretation of Transmission Operations Reliability...

  8. On estimation of reliability for pipe lines of heat power plants under cyclic loading

    International Nuclear Information System (INIS)

    Verezemskij, V.G.

    1986-01-01

    One of the possible methods to obtain a quantitative estimate of the reliability for pipe lines of the welded heat power plants under cyclic loading due to heating-cooling and due to vibration is considered. Reliability estimate is carried out for a common case of loading by simultaneous cycles with different amplitudes and loading asymmetry. It is shown that scattering of the breaking number of cycles for the metal of welds may perceptibly decrease reliability of the welded pipe line

  9. 76 FR 66055 - North American Electric Reliability Corporation; Order Approving Interpretation of Reliability...

    Science.gov (United States)

    2011-10-25

    ...\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242... materially affected'' by Bulk-Power System reliability may request an interpretation of a Reliability... Electric Reliability Corporation; Order Approving Interpretation of Reliability Standard; Before...

  10. Human Reliability analysis for digitized nuclear power plants: Case study on the LingAo II nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Zou, Yan Hua; Zhang, Li [Institute of Human Factors Engineering AND Safety Management, Hunan Institute of Technology, Hengyang (China); Dai, Cao; Li, Peng Cheng; Qing, Tao [Human Factors Institute, University of South China, Hengyang (China)

    2017-03-15

    The main control room (MCR) in advanced nuclear power plants (NPPs) has changed from analog to digital control system (DCS). Operation and control have become more automated, centralized, and accurate due to the digitalization of NPPs, which has improved the efficiency and security of the system. New issues associated with human reliability inevitably arise due to the adoption of new accident procedures and digitalization of main control rooms in NPPs. The LingAo II NPP is the first digital NPP in China to apply the state-oriented procedure. In order to address issues related to human reliability analysis for DCS and DCS + state-oriented procedure, the Hunan Institute of Technology conducted a research project based on a cooperative agreement with the LingDong Nuclear Power Co. Ltd. This paper is a brief introduction to the project.

  11. Human Reliability Analysis for Digitized Nuclear Power Plants: Case Study on the LingAo II Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Yanhua Zou

    2017-03-01

    Full Text Available The main control room (MCR in advanced nuclear power plants (NPPs has changed from analog to digital control system (DCS. Operation and control have become more automated, centralized, and accurate due to the digitalization of NPPs, which has improved the efficiency and security of the system. New issues associated with human reliability inevitably arise due to the adoption of new accident procedures and digitalization of main control rooms in NPPs. The LingAo II NPP is the first digital NPP in China to apply the state-oriented procedure. In order to address issues related to human reliability analysis for DCS and DCS + state-oriented procedure, the Hunan Institute of Technology conducted a research project based on a cooperative agreement with the LingDong Nuclear Power Co. Ltd. This paper is a brief introduction to the project.

  12. Reliability of the electric power supply in the safety apparatus of nuclear power plants: a comparative analysis

    International Nuclear Information System (INIS)

    Cruz, L.A.

    1992-01-01

    This paper discusses the risk of total loss of electric power supply to the Class 1E system. Two alternatives are focused: a system with two off-site and two onsite power supplies emergency power supply, as recommended by the American Regulations, and a system with only one off-site and four on-site power supplies, applicable when two off-site are not available. To allow the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability of a simultaneous failure of all power sources. The sensitivity of each parameter is studied in each case and, on the basis of the results of the study, the author conclude that the system with two off-site power supplies is preferable in all alternatives analysed, although the system with one off-site power supply can be adopted with high reliability diesel-generators. (author)

  13. Mechano-Magnetic Telemetry for Underground Water Infrastructure Monitoring

    Directory of Open Access Journals (Sweden)

    Daniel Orfeo

    2018-06-01

    Full Text Available This study reports on the theory of operation, design principles, and results from laboratory and field tests of a magnetic telemetry system for communication with underground infrastructure sensors using rotating permanent magnets as the sources and compact magnetometers as the receivers. Many cities seek ways to monitor underground water pipes with centrally managed Internet of Things (IoT systems. This requires the development of numerous reliable low-cost wireless sensors, such as moisture sensors and flow meters, which can transmit information from subterranean pipes to surface-mounted receivers. Traditional megahertz radio communication systems are often unable to penetrate through multiple feet of earthen and manmade materials and have impractically large energy requirements which preclude the use of long-life batteries, require complex (and expensive built-in energy harvesting systems, or long leads that run antennas near to the surface. Low-power magnetic signaling systems do not suffer from this drawback: low-frequency electromagnetic waves readily penetrate through several feet of earth and water. Traditional magnetic telemetry systems that use energy-inefficient large induction coils and antennas as sources and receivers are not practical for underground IoT-type sensing applications. However, rotating a permanent magnet creates a completely reversing oscillating magnetic field. The recent proliferation of strong rare-earth permanent magnets and high-sensitivity magnetometers enables alternative magnetic telemetry system concepts with significantly more compact formats and lower energy consumption. The system used in this study represents a novel combination of megahertz radio and magnetic signaling techniques for the purposes of underground infrastructure monitoring. In this study, two subterranean infrastructure sensors exploit this phenomenon to transmit information to an aboveground radio-networked magnetometer receiver. A flow

  14. Towards a Wireless and Low-Power Infrastructure for Representing Information Based on E-Paper Displays

    Directory of Open Access Journals (Sweden)

    Diego Sánchez-de-Rivera

    2017-01-01

    Full Text Available There has been much interest in replacing traditional information supports with more technological solutions in recent years. New technologies which allow paper-like perception with minimal power needs have emerged as low-power wireless scenarios. A priority for these new supports is to create the architecture for a scalable solution which maintains minimal power requirements. The retail industry demands a new information infrastructure that improves customer and employee satisfaction. In this work, authors propose an information provision architecture based on E-Paper and carry out an experiment where different smart labeling architectures based on Paper, E-Paper, LED liquid crystal display (LCD and Dot-matrix LCD were tested in order to determine which is best suited for a real labeling environment. Enclosed in a research project called SMARKET, the authors pilot-tested the work in a real supermarket, having the opportunity to survey employees and customers about satisfaction and frustration with the use of the architectures proposed in this research work.

  15. Handbook on Securing Cyber-Physical Critical Infrastructure

    CERN Document Server

    Das, Sajal K; Zhang, Nan

    2012-01-01

    The worldwide reach of the Internet allows malicious cyber criminals to coordinate and launch attacks on both cyber and cyber-physical infrastructure from anywhere in the world. This purpose of this handbook is to introduce the theoretical foundations and practical solution techniques for securing critical cyber and physical infrastructures as well as their underlying computing and communication architectures and systems. Examples of such infrastructures include utility networks (e.g., electrical power grids), ground transportation systems (automotives, roads, bridges and tunnels), airports a

  16. Data Distribution Service-Based Interoperability Framework for Smart Grid Testbed Infrastructure

    Directory of Open Access Journals (Sweden)

    Tarek A. Youssef

    2016-03-01

    Full Text Available This paper presents the design and implementation of a communication and control infrastructure for smart grid operation. The proposed infrastructure enhances the reliability of the measurements and control network. The advantages of utilizing the data-centric over message-centric communication approach are discussed in the context of smart grid applications. The data distribution service (DDS is used to implement a data-centric common data bus for the smart grid. This common data bus improves the communication reliability, enabling distributed control and smart load management. These enhancements are achieved by avoiding a single point of failure while enabling peer-to-peer communication and an automatic discovery feature for dynamic participating nodes. The infrastructure and ideas presented in this paper were implemented and tested on the smart grid testbed. A toolbox and application programing interface for the testbed infrastructure are developed in order to facilitate interoperability and remote access to the testbed. This interface allows control, monitoring, and performing of experiments remotely. Furthermore, it could be used to integrate multidisciplinary testbeds to study complex cyber-physical systems (CPS.

  17. Trial application of reliability technology to emergency diesel generators at the Trojan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Wong, S.M.; Boccio, J.L.; Karimian, S.; Azarm, M.A.; Carbonaro, J.; DeMoss, G.

    1986-01-01

    In this paper, a trial application of reliability technology to the emergency diesel generator system at the Trojan Nuclear Power Plant is presented. An approach for formulating a reliability program plan for this system is being developed. The trial application has shown that a reliability program process, using risk- and reliability-based techniques, can be interwoven into current plant operational activities to help in controlling, analyzing, and predicting faults that can challenge safety systems. With the cooperation of the utility, Portland General Electric Co., this reliability program can eventually be implemented at Trojan to track its effectiveness

  18. Reliability of large and complex systems

    CERN Document Server

    Kolowrocki, Krzysztof

    2014-01-01

    Reliability of Large and Complex Systems, previously titled Reliability of Large Systems, is an innovative guide to the current state and reliability of large and complex systems. In addition to revised and updated content on the complexity and safety of large and complex mechanisms, this new edition looks at the reliability of nanosystems, a key research topic in nanotechnology science. The author discusses the importance of safety investigation of critical infrastructures that have aged or have been exposed to varying operational conditions. This reference provides an asympt

  19. Why Russia still wants nuclear power

    International Nuclear Information System (INIS)

    Perera, J.

    1993-01-01

    Despite a recent explosion at the Tomsk uranium reprocessing plant in Siberia, and the aftermath of the Chernobyl accident, support for nuclear power is still firm in Russia. The Russian nuclear industry employs around two million people and their employment security is one of the chief factors in support of the nuclear power industry despite its safety record. The other major reason is energy shortages. Despite huge natural deposits of petroleum and gas, electric power shortages are widespread. Eighty per cent of Russia's electric power comes from oil-fired power stations, but oil supplies are unreliable. Production is dropping and, at the same time, an increasing proportion of the oil produced is exported to earn foreign currency. The concerns of environmental groups may have to be shelved, until Russia's infrastructure is efficient enough to maintain power supplies reliably. (UK)

  20. Reliability analysis for power supply system in a reprocessing facility based on GO methodology

    International Nuclear Information System (INIS)

    Wang Renze

    2014-01-01

    GO methodology was applied to analyze the reliability of power supply system in a typical reprocessing facility. Based on the fact that tie breakers are set in the system, tie breaker operator was defined. Then GO methodology modeling and quantitative analysis were performed sequently, minimal cut sets and average unavailability of the system were obtained. Parallel analysis between GO methodology and fault tree methodology was also performed. The results showed that setup of tie breakers was rational and necessary and that the modeling was much easier and the chart was much more succinct for GO methodology parallel with fault tree methodology to analyze the reliability of the power supply system. (author)

  1. Service-oriented advanced metering infrastructure for smart grids

    NARCIS (Netherlands)

    Chen, S.; Lukkien, J.J.; Zhang, L.

    2011-01-01

    Advanced Metering Infrastructure (AMI) enables smart grids to involve power consumers in the business process of power generation transmission, distribution and consumption. However, the participant of consumers challenges the current power systems with system integration and cooperation and

  2. Service-oriented advanced metering infrastructure for smart grids

    NARCIS (Netherlands)

    Chen, S.; Lukkien, J.J.; Zhang, L.

    2010-01-01

    Advanced Metering Infrastructure (AMI) enables smart grids to involve power consumers in the business process of power generation, transmission, distribution and consumption. However, the participant of consumers challenges the current power systems with system integration and cooperation and

  3. Relativity evaluation of reliability on operation in nuclear power plant

    International Nuclear Information System (INIS)

    Inata, Takashi

    1987-01-01

    The report presents a quantitative method for evaluating the reliability of operations conducted in nuclear power plants. The quantitative reliability evaluation method is based on the 'detailed block diagram analysis (De-BDA)'. All units of a series of operations are separately displayed for each block and combined sequentially. Then, calculation is performed to evaluate the reliability. Basically, De-BDA calculation is made for pairs of operation labels, which are connected in parallel or in series at different subordination levels. The applicability of the De-BDA method is demonstrated by carrying out calculation for three model cases: operations in the event of malfunction of the control valve in the main water supply system for PWR, switching from an electrically-operated water supply pump to a turbin-operated water supply pump, and isolation and water removal operation for a low-pressure condensate pump. It is shown that the relative importance of each unit of a series of operations can be evaluated, making it possible to extract those units of greater importance, and that the priority among the factors which affect the reliability of operations can be determined. Results of the De-BDA calculation can serve to find important points to be considered in developing an operation manual, conducting education and training, and improving facilities. (Nogami, K.)

  4. A simple, robust and reliable wind diesel concept for remote power supply

    DEFF Research Database (Denmark)

    Lundsager, P.; Bindner, H.

    1994-01-01

    The paper introduces a Wind Diesel concept suitable for remote communities, the 'Simple, Robust and Reliable Concept' developed at Riso. All components are standard components, the system is self regulating using the component controllers and there is no power electronics. The paper documents...

  5. Power beaming providing a space power infrastructure

    International Nuclear Information System (INIS)

    Bamberger, J.A.; Coomes, E.P.

    1992-01-01

    This paper, based on two levels of technology maturity, applied the power beaming concept to four panned satellite constellations. The analysis shows that with currently available technology, power beaming can provide mass savings to constellations in orbits ranging from low-Earth orbit to geosynchronous orbit. Two constellations, space surveillance and tracking system and space-based radar, can be supported with current technology. The other two constellations, space-based laser array and boost surveillance and tracking system, will require power and transmission system improvements before their breakeven specific mass is achieved. A doubling of SP-100 conversion efficiency from 10 to 20% would meet or exceed breakeven for these constellations

  6. STUDIES ON IGBT MODULE TO IMPROVE THE RELIABILITY OF POWER ELECTRONIC SYSTEMS

    DEFF Research Database (Denmark)

    Choi, Uimin

    component level to converter level. It is divided into two main parts: the first part, which consists of Chapters 2 and 3, is reliability studies of the IGBT module regarding thermal stresses and the second part, composed of Chapters 4 and 5, discusses strategies to improve the reliability and availability...... are presented. Then, in Chapter 3, the effect of junction temperature swing duration t△Tj on the lifetime of the transfer molded Intelligent Power IGBT Module is investigated and modeled based on the power cycling test results. In addition, the physics-of-failure analysis results of the tested modules...... are presented. Finally, in Chapters 4 and 5, open-circuit fault detection and fault-tolerant control methods are proposed for two kinds of neutral-point clamped three-level inverters T-type and NPC inverters. One of main contributions in this project is the development of an apparatus and methodology...

  7. THE ANALYSIS OF STRUCTURAL RELIABILITY OF THE MAIN ELECTRIC CONNECTION CIRCUITS OF NUCLEAR POWER PLANTS

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2017-01-01

    Full Text Available The reliability of the main circuit of electrical connections at a nuclear electric power plant that has two units with a capacity of 1,200 MW each has been determined. Reliability, economical, maneuverable properties of the atomic power plant under study are largely determined by its main circuit, so the choice of the circuit for the design and its status in the process of operation occur to be critical objectives. Main electrical connection circuits in nuclear electric power plants are selected on the basis of the schematic networks of the energy system and the land attached to the plant. The circuit of the connection of a nuclear power plant to the grid in the original normal operating modes at all stages of the construction of such a plant should provide the outcome of the full added capacity of a nuclear power plant and the preservation of its stability in the power system without the influence of the emergency system automatics when any outgoing transmission line is disabled. When selecting the main circuit the individual capacity of the installed units and their number are taken into account as well as the order of development of the plant and power supply system; the voltage on which the power of a plant is delivered; a shortcircuit current for switchgear high voltage and the need for their limitation by circuit means; the most power that can be lost when damage to any switch. A model of reliability of the main circuit of electrical connections is designed to detect all types of accidents that are possible at the coincidence of failures of elements with the repair and operational modes that differs in composition and damageability of the equipment, as well as under conditions of the development of accidents due to failure of operation of devices of relay protection and automation.

  8. Reliability Constrained Priority Load Shedding for Aerospace Power System Automation

    Science.gov (United States)

    Momoh, James A.; Zhu, Jizhong; Kaddah, Sahar S.; Dolce, James L. (Technical Monitor)

    2000-01-01

    The need for improving load shedding on board the space station is one of the goals of aerospace power system automation. To accelerate the optimum load-shedding functions, several constraints must be involved. These constraints include congestion margin determined by weighted probability contingency, component/system reliability index, generation rescheduling. The impact of different faults and indices for computing reliability were defined before optimization. The optimum load schedule is done based on priority, value and location of loads. An optimization strategy capable of handling discrete decision making, such as Everett optimization, is proposed. We extended Everett method to handle expected congestion margin and reliability index as constraints. To make it effective for real time load dispatch process, a rule-based scheme is presented in the optimization method. It assists in selecting which feeder load to be shed, the location of the load, the value, priority of the load and cost benefit analysis of the load profile is included in the scheme. The scheme is tested using a benchmark NASA system consisting of generators, loads and network.

  9. Nuclear power generating station operability assurance reliability, availability, and maintainability application for maintenance management

    International Nuclear Information System (INIS)

    Cleveland, J.W.; Regenie, T.R.; Wilson, R.J.

    1985-01-01

    Environmental qualification and equipment warrantee insurance stipulations should be supplemented with a reliable maintainability program structured to identify and control fast failing subcomponents within critical equipment. Anticipation of equipment subcomponent failures can control unnecessary plant off-line occurrences. Incorporation of reliability, availability, and maintainability considerations into plant maintenance policies on power generation and safety related items have positive cost benefit advantages

  10. Basis for the power supply reliability study of the 1 MW neutron source

    International Nuclear Information System (INIS)

    McGhee, D.G.; Fathizadeh, M.

    1993-01-01

    The Intense Pulsed Neutron Source (IPNS) upgrade to 1 MW requires new power supply designs. This paper describes the tools and the methodology needed to assess the reliability of the power supplies. Both the design and operation of the power supplies in the synchrotron will be taken into account. To develop a reliability budget, the experiments to be conducted with this accelerator are reviewed, and data is collected on the number and duration of interruptions possible before an experiment is required to start over. Once the budget is established, several accelerators of this type will be examined. The budget is allocated to the different accelerator systems based on their operating experience. The accelerator data is usually in terms of machine availability and system down time. It takes into account mean time to failure (MTTF), time to diagnose, time to repair or replace the failed components, and time to get the machine back online. These estimated times are used as baselines for the design. Even though we are in the early stage of design, available data can be analyzed to estimate the MTTF for the power supplies

  11. Human reliability in non-destructive inspections of nuclear power plant components: modeling and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcelos, Vanderley de; Soares, Wellington Antonio; Marques, Raíssa Oliveira; Silva Júnior, Silvério Ferreira da; Raso, Amanda Laureano, E-mail: vasconv@cdtn.br, E-mail: soaresw@cdtn.br, E-mail: raissaomarques@gmail.com, E-mail: silvasf@cdtn.br, E-mail: amandaraso@hotmail.com [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2017-07-01

    Non-destructive inspection (NDI) is one of the key elements in ensuring quality of engineering systems and their safe use. NDI is a very complex task, during which the inspectors have to rely on their sensory, perceptual, cognitive, and motor skills. It requires high vigilance once it is often carried out on large components, over a long period of time, and in hostile environments and restriction of workplace. A successful NDI requires careful planning, choice of appropriate NDI methods and inspection procedures, as well as qualified and trained inspection personnel. A failure of NDI to detect critical defects in safety-related components of nuclear power plants, for instance, may lead to catastrophic consequences for workers, public and environment. Therefore, ensuring that NDI methods are reliable and capable of detecting all critical defects is of utmost importance. Despite increased use of automation in NDI, human inspectors, and thus human factors, still play an important role in NDI reliability. Human reliability is the probability of humans conducting specific tasks with satisfactory performance. Many techniques are suitable for modeling and analyzing human reliability in NDI of nuclear power plant components. Among these can be highlighted Failure Modes and Effects Analysis (FMEA) and THERP (Technique for Human Error Rate Prediction). The application of these techniques is illustrated in an example of qualitative and quantitative studies to improve typical NDI of pipe segments of a core cooling system of a nuclear power plant, through acting on human factors issues. (author)

  12. Human reliability in non-destructive inspections of nuclear power plant components: modeling and analysis

    International Nuclear Information System (INIS)

    Vasconcelos, Vanderley de; Soares, Wellington Antonio; Marques, Raíssa Oliveira; Silva Júnior, Silvério Ferreira da; Raso, Amanda Laureano

    2017-01-01

    Non-destructive inspection (NDI) is one of the key elements in ensuring quality of engineering systems and their safe use. NDI is a very complex task, during which the inspectors have to rely on their sensory, perceptual, cognitive, and motor skills. It requires high vigilance once it is often carried out on large components, over a long period of time, and in hostile environments and restriction of workplace. A successful NDI requires careful planning, choice of appropriate NDI methods and inspection procedures, as well as qualified and trained inspection personnel. A failure of NDI to detect critical defects in safety-related components of nuclear power plants, for instance, may lead to catastrophic consequences for workers, public and environment. Therefore, ensuring that NDI methods are reliable and capable of detecting all critical defects is of utmost importance. Despite increased use of automation in NDI, human inspectors, and thus human factors, still play an important role in NDI reliability. Human reliability is the probability of humans conducting specific tasks with satisfactory performance. Many techniques are suitable for modeling and analyzing human reliability in NDI of nuclear power plant components. Among these can be highlighted Failure Modes and Effects Analysis (FMEA) and THERP (Technique for Human Error Rate Prediction). The application of these techniques is illustrated in an example of qualitative and quantitative studies to improve typical NDI of pipe segments of a core cooling system of a nuclear power plant, through acting on human factors issues. (author)

  13. Reliability and statistical power analysis of cortical and subcortical FreeSurfer metrics in a large sample of healthy elderly.

    Science.gov (United States)

    Liem, Franziskus; Mérillat, Susan; Bezzola, Ladina; Hirsiger, Sarah; Philipp, Michel; Madhyastha, Tara; Jäncke, Lutz

    2015-03-01

    FreeSurfer is a tool to quantify cortical and subcortical brain anatomy automatically and noninvasively. Previous studies have reported reliability and statistical power analyses in relatively small samples or only selected one aspect of brain anatomy. Here, we investigated reliability and statistical power of cortical thickness, surface area, volume, and the volume of subcortical structures in a large sample (N=189) of healthy elderly subjects (64+ years). Reliability (intraclass correlation coefficient) of cortical and subcortical parameters is generally high (cortical: ICCs>0.87, subcortical: ICCs>0.95). Surface-based smoothing increases reliability of cortical thickness maps, while it decreases reliability of cortical surface area and volume. Nevertheless, statistical power of all measures benefits from smoothing. When aiming to detect a 10% difference between groups, the number of subjects required to test effects with sufficient power over the entire cortex varies between cortical measures (cortical thickness: N=39, surface area: N=21, volume: N=81; 10mm smoothing, power=0.8, α=0.05). For subcortical regions this number is between 16 and 76 subjects, depending on the region. We also demonstrate the advantage of within-subject designs over between-subject designs. Furthermore, we publicly provide a tool that allows researchers to perform a priori power analysis and sensitivity analysis to help evaluate previously published studies and to design future studies with sufficient statistical power. Copyright © 2014 Elsevier Inc. All rights reserved.

  14. A dynamic simulation model for assessing the overall impact of incentive policies on power system reliability, costs and environment

    International Nuclear Information System (INIS)

    Ibanez-Lopez, A.S.; Martinez-Val, J.M.; Moratilla-Soria, B.Y.

    2017-01-01

    The liberalization of power markets has entailed dramatic changes in power system planning worldwide. The inception of new alternative technologies, smart grids and distributed generation and storage is expected to make system planning even more challenging. Government policies still play a major role in the evolution of a country's power generation mix, even in those countries with liberalized markets. This paper presents a System Dynamics model aimed at assessing the overall technical, economic and environmental impact of renewable energy incentives and capacity payment policies. The model has been used to simulate Spain's power industry in order to assess the impact of electric power policies with the goal of getting insights regarding how to achieve an optimum power generation mix. The main conclusions of the present paper are (i) the necessity of specific regulatory actions in Spain in order to keep adequate reliability levels, avoid price spikes and boom and bust investment cycles as well as to deploy specific technologies, (ii) the fact that capacity payments are a better instrument for keeping adequate reserve margins and avoiding power price spikes than renewable energy incentives and (iii) the evidence that both instruments entail additional system costs over the base case scenario. - Highlights: • A System Dynamics model of Spain's power generation mix is proposed. • The overall policy impact on system costs, environment and reliability is assessed. • Current policies are not enough to keep adequate reliability levels. • Capacity payments are an adequate instrument for guaranteeing system reliability. • RES incentives do not solve reliability issues and entail greater system costs.

  15. Risk-based methods for reliability investments in electric power distribution systems

    Energy Technology Data Exchange (ETDEWEB)

    Alvehag, Karin

    2011-07-01

    Society relies more and more on a continuous supply of electricity. However, while under investments in reliability lead to an unacceptable number of power interruptions, over investments result in too high costs for society. To give incentives for a socio economically optimal level of reliability, quality regulations have been adopted in many European countries. These quality regulations imply new financial risks for the distribution system operator (DSO) since poor reliability can reduce the allowed revenue for the DSO and compensation may have to be paid to affected customers. This thesis develops a method for evaluating the incentives for reliability investments implied by different quality regulation designs. The method can be used to investigate whether socio economically beneficial projects are also beneficial for a profit-maximizing DSO subject to a particular quality regulation design. To investigate which reinvestment projects are preferable for society and a DSO, risk-based methods are developed. With these methods, the probability of power interruptions and the consequences of these can be simulated. The consequences of interruptions for the DSO will to a large extent depend on the quality regulation. The consequences for the customers, and hence also society, will depend on factors such as the interruption duration and time of occurrence. The proposed risk-based methods consider extreme outage events in the risk assessments by incorporating the impact of severe weather, estimating the full probability distribution of the total reliability cost, and formulating a risk-averse strategy. Results from case studies performed show that quality regulation design has a significant impact on reinvestment project profitability for a DSO. In order to adequately capture the financial risk that the DSO is exposed to, detailed riskbased methods, such as the ones developed in this thesis, are needed. Furthermore, when making investment decisions, a risk

  16. IEEE standard requirements for reliability analysis in the design and operation of safety systems for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The purpose of this standard is to provide uniform, minimum acceptable requirements for the performance of reliability analyses for safety-related systems found in nuclear-power generating stations, but not to define the need for an analysis. The need for reliability analysis has been identified in other standards which expand the requirements of regulations (e.g., IEEE Std 379-1972 (ANSI N41.2-1972), ''Guide for the Application of the Single-Failure Criterion to Nuclear Power Generating Station Protection System,'' which describes the application of the single-failure criterion). IEEE Std 352-1975, ''Guide for General Principles of Reliability Analysis of Nuclear Power Generating Station Protection Systems,'' provides guidance in the application and use of reliability techniques referred to in this standard

  17. Feasibility study for linking railway network and power transmission infrastructure; Machbarkeitsstudie zur Verknuepfung von Bahn- und Energieleitungsinfrastrukturen

    Energy Technology Data Exchange (ETDEWEB)

    Hofmann, Lutz; Rathke, Christian [Hannover Univ. (Germany). Inst. fuer Energieversorgung und Hochspannungstechnik; Stephan, Arnd; Albrecht, Andreas [Technische Univ. Dresden (Germany). Inst. fuer Bahnfahrzeuge und Bahntechnik; Weyer, Hartmut; Lismann, Christian (comps.) [Technische Univ. Clausthal, Clausthal-Zellerfeld (Germany). Inst. fuer Deutsches und Internationales Berg- und Energierecht

    2013-03-15

    At times of growing emergencies of electricity transport, the extension of transmission becomes a necessary and compulsory component of the energy concept of the Federal Government. The extension of the capacities of the network transportation from North to South and from east to West is inevitable. Under this aspect, the contribution under consideration analyzes whether and to what extent the utilization of the existing railways potentials of the 16.7 Hz traction power supply system of the DB Energie GmbH (Frankfurt (Main), Federal Republic of Germany) is possible for the establishment of new power transmission lines of the general 50 Hz power supply. Furthermore, it is investigated to what extent possibilities of infrastructure connections exist in the shape of combined transmission routes between traction supply and public energy supply.

  18. Research on cognitive reliability model for main control room considering human factors in nuclear power plants

    International Nuclear Information System (INIS)

    Jiang Jianjun; Zhang Li; Wang Yiqun; Zhang Kun; Peng Yuyuan; Zhou Cheng

    2012-01-01

    Facing the shortcomings of the traditional cognitive factors and cognitive model, this paper presents a Bayesian networks cognitive reliability model by taking the main control room as a reference background and human factors as the key points. The model mainly analyzes the cognitive reliability affected by the human factors, and for the cognitive node and influence factors corresponding to cognitive node, a series of methods and function formulas to compute the node cognitive reliability is proposed. The model and corresponding methods can be applied to the evaluation of cognitive process for the nuclear power plant operators and have a certain significance for the prevention of safety accidents in nuclear power plants. (authors)

  19. 76 FR 16240 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits

    Science.gov (United States)

    2011-03-23

    ... identified by the Commission. \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... reliability of the interconnection by ensuring that the bulk electric system is assessed during the operations... responsibility for SOLs. Further, Bulk-Power System reliability practices assign responsibilities for analyzing...

  20. Estimation of reliability on digital plant protection system in nuclear power plants using fault simulation with self-checking

    International Nuclear Information System (INIS)

    Lee, Jun Seok; Kim, Suk Joon; Seong, Poong Hyun

    2004-01-01

    Safety-critical digital systems in nuclear power plants require high design reliability. Reliable software design and accurate prediction methods for the system reliability are important problems. In the reliability analysis, the error detection coverage of the system is one of the crucial factors, however, it is difficult to evaluate the error detection coverage of digital instrumentation and control system in nuclear power plants due to complexity of the system. To evaluate the error detection coverage for high efficiency and low cost, the simulation based fault injections with self checking are needed for digital instrumentation and control system in nuclear power plants. The target system is local coincidence logic in digital plant protection system and a simplified software modeling for this target system is used in this work. C++ based hardware description of micro computer simulator system is used to evaluate the error detection coverage of the system. From the simulation result, it is possible to estimate the error detection coverage of digital plant protection system in nuclear power plants using simulation based fault injection method with self checking. (author)

  1. Reliability of power and velocity variables collected during the traditional and ballistic bench press exercise.

    Science.gov (United States)

    García-Ramos, Amador; Haff, G Gregory; Padial, Paulino; Feriche, Belén

    2018-03-01

    This study aimed to examine the reliability of different power and velocity variables during the Smith machine bench press (BP) and bench press throw (BPT) exercises. Twenty-two healthy men conducted four testing sessions after a preliminary BP one-repetition maximum (1RM) test. In a counterbalanced order, participants performed two sessions of BP in one week and two sessions of BPT in another week. Mean propulsive power, peak power, mean propulsive velocity, and peak velocity at each tenth percentile (20-70% of 1RM) were recorded by a linear transducer. The within-participants coefficient of variation (CV) was higher for the load-power relationship compared to the load-velocity relationship in both the BP (5.3% vs. 4.1%; CV ratio = 1.29) and BPT (4.7% vs. 3.4%; CV ratio = 1.38). Mean propulsive variables showed lower reliability than peak variables in both the BP (5.4% vs. 4.0%, CV ratio = 1.35) and BPT (4.8% vs. 3.3%, CV ratio = 1.45). All variables were deemed reliable, with the peak velocity demonstrating the lowest within-participants CV. Based upon these findings, the peak velocity should be chosen for the accurate assessment of BP and BPT performance.

  2. 650-nm-band high-power and highly reliable laser diodes with a window-mirror structure

    Science.gov (United States)

    Shima, Akihiro; Hironaka, Misao; Ono, Ken-ichi; Takemi, Masayoshi; Sakamoto, Yoshifumi; Kunitsugu, Yasuhiro; Yamashita, Koji

    1998-05-01

    An active layer structure with 658 nm-emission at 25 degrees Celsius has been optimized in order to reduce the operating current of the laser diodes (LD) under high temperature condition. For improvement of the maximum output power and the reliability limited by mirror degradation, we have applied a zinc-diffused-type window-mirror structure which prevents the optical absorption at the mirror facet. As a result, the CW output power of 50 mW is obtained even at 80 degrees Celsius for a 650 micrometer-long window-mirror LD. In addition, the maximum light output power over 150 mW at 25 degrees Celsius has been realized without any optical mirror damage. In the aging tests, the LDs have been operating for over 2,500 - 5,000 hours under the CW condition of 30 - 50 mW at 60 degrees Celsius. The window-mirror structure also enables reliable 60 degree Celsius, 30 mW, CW operation of the LDs with 651 nm- emission at 25 degrees Celsius. Moreover, the maximum output power of around 100 mW even at 80 degrees Celsius and reliable 2,000-hour operation at 60 degrees Celsius, 70 mW have been realized for the first time by 659 nm LDs with a long cavity length of 900 micrometers.

  3. 78 FR 38851 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Science.gov (United States)

    2013-06-28

    ... either: Provide little protection for Bulk-Power System reliability or are redundant with other aspects... for retirement either: (1) Provide little protection for Bulk-Power System reliability or (2) are... to assure reliability of the Bulk-Power System and should be withdrawn. We have identified 41...

  4. Interdependencies and reliability in the combined ICT and power system: An overview of current research

    Directory of Open Access Journals (Sweden)

    Inger Anne Tøndel

    2018-01-01

    Full Text Available The smart grid vision implies extensive use of ICT in the power system, enabling increased flexibility and functionality and thereby meeting future demands and strategic goals. Consequently, power system reliability will increasingly depend on ICT components and systems. While adding functionality, ICT systems also contribute to failures, such as hidden failures in protection systems, as has been exemplified by recent power outages. It also brings new threats, such as that of cyber-attacks. To ensure effective power system reliability, the interdependencies between power and ICT systems need to be properly understood. This paper provides an overview of main interdependency categories, as well as methods that can be used to identify and study interdependencies. Based on a study of recent papers in major archival journals, we conclude that appropriate methods for identification of interdependencies between power and ICT systems seem to be lacking. In addition, current methods seem unable to both cover the power system at large, and at the same time take into account the full array of intentional and accidental threats. Based on these findings, we make recommendations for future research in this field.

  5. Improving human reliability through better nuclear power plant system design: Program for advanced nuclear power studies

    International Nuclear Information System (INIS)

    Golay, M.W.

    1993-01-01

    The project on ''Development of a Theory of the Dependence of Human Reliability upon System Designs as a Means of Improving Nuclear Power Plant Performance'' was been undertaken in order to address the problem of human error in advanced nuclear power plant designs. Lack of a mature theory has retarded progress in reducing likely frequencies of human errors. Work being pursued in this project is to perform a set of experiments involving human subjects who are required to operate, diagnose and respond to changes in computer-simulated systems, relevant to those encountered in nuclear power plants, which are made to differ in complexity in a systematic manner. The computer program used to present the problems to be solved also records the response of the operator as it unfolds

  6. A Methodology and Toolkit for Deploying Reliable Security Policies in Critical Infrastructures

    Directory of Open Access Journals (Sweden)

    Faouzi Jaïdi

    2018-01-01

    Full Text Available Substantial advances in Information and Communication Technologies (ICT bring out novel concepts, solutions, trends, and challenges to integrate intelligent and autonomous systems in critical infrastructures. A new generation of ICT environments (such as smart cities, Internet of Things, edge-fog-social-cloud computing, and big data analytics is emerging; it has different applications to critical domains (such as transportation, communication, finance, commerce, and healthcare and different interconnections via multiple layers of public and private networks, forming a grid of critical cyberphysical infrastructures. Protecting sensitive and private data and services in critical infrastructures is, at the same time, a main objective and a great challenge for deploying secure systems. It essentially requires setting up trusted security policies. Unfortunately, security solutions should remain compliant and regularly updated to follow and track the evolution of security threats. To address this issue, we propose an advanced methodology for deploying and monitoring the compliance of trusted access control policies. Our proposal extends the traditional life cycle of access control policies with pertinent activities. It integrates formal and semiformal techniques allowing the specification, the verification, the implementation, the reverse-engineering, the validation, the risk assessment, and the optimization of access control policies. To automate and facilitate the practice of our methodology, we introduce our system SVIRVRO that allows managing the extended life cycle of access control policies. We refer to an illustrative example to highlight the relevance of our contributions.

  7. Reliability and relationships among handgrip strength, leg extensor strength and power, and balance in older men.

    Science.gov (United States)

    Jenkins, Nathaniel D M; Buckner, Samuel L; Bergstrom, Haley C; Cochrane, Kristen C; Goldsmith, Jacob A; Housh, Terry J; Johnson, Glen O; Schmidt, Richard J; Cramer, Joel T

    2014-10-01

    To quantify the reliability of isometric leg extension torque (LEMVC), rate of torque development (LERTD), isometric handgrip force (HGMVC) and RFD (HGRFD), isokinetic leg extension torque and power at 1.05rad·s(-1) and 3.14rad·s(-1); and explore relationships among strength, power, and balance in older men. Sixteen older men completed 3 isometric handgrips, 3 isometric leg extensions, and 3 isokinetic leg extensions at 1.05rad·s(-1) and 3.14rad·s(-1) during two visits. Intraclass correlation coefficients (ICCs), ICC confidence intervals (95% CI), coefficients of variation (CVs), and Pearson correlation coefficients were calculated. LERTD demonstrated no reliability. The CVs for LERTD and HGRFD were ≤23.26%. HGMVC wasn't related to leg extension torque or power, or balance (r=0.14-0.47; p>0.05). However, moderate to strong relationships were found among isokinetic leg extension torque at 1.05rad·s(-1) and 3.14rad·s(-1), leg extension mean power at 1.05rad·s(-1), and functional reach (r=0.51-0.95; p≤0.05). LERTD and HGRFD weren't reliable and shouldn't be used as outcome variables in older men. Handgrip strength may not be an appropriate surrogate for lower body strength, power, or balance. Instead, perhaps handgrip strength should only be used to describe upper body strength or functionality, which may compliment isokinetic assessments of lower body strength, which were reliable and related to balance. Copyright © 2014 Elsevier Inc. All rights reserved.

  8. Reliability and cost evaluation of small isolated power systems containing photovoltaic and wind energy

    Science.gov (United States)

    Karki, Rajesh

    Renewable energy application in electric power systems is growing rapidly worldwide due to enhanced public concerns for adverse environmental impacts and escalation in energy costs associated with the use of conventional energy sources. Photovoltaics and wind energy sources are being increasingly recognized as cost effective generation sources. A comprehensive evaluation of reliability and cost is required to analyze the actual benefits of utilizing these energy sources. The reliability aspects of utilizing renewable energy sources have largely been ignored in the past due the relatively insignificant contribution of these sources in major power systems, and consequently due to the lack of appropriate techniques. Renewable energy sources have the potential to play a significant role in the electrical energy requirements of small isolated power systems which are primarily supplied by costly diesel fuel. A relatively high renewable energy penetration can significantly reduce the system fuel costs but can also have considerable impact on the system reliability. Small isolated systems routinely plan their generating facilities using deterministic adequacy methods that cannot incorporate the highly erratic behavior of renewable energy sources. The utilization of a single probabilistic risk index has not been generally accepted in small isolated system evaluation despite its utilization in most large power utilities. Deterministic and probabilistic techniques are combined in this thesis using a system well-being approach to provide useful adequacy indices for small isolated systems that include renewable energy. This thesis presents an evaluation model for small isolated systems containing renewable energy sources by integrating simulation models that generate appropriate atmospheric data, evaluate chronological renewable power outputs and combine total available energy and load to provide useful system indices. A software tool SIPSREL+ has been developed which generates

  9. The Gulf Nuclear Energy Infrastructure Institute (GNEII) Four Years On

    International Nuclear Information System (INIS)

    Finch, Robert J.; Mohagheghi, Amir H.; Solodov, Alexander; Beeley, Philip A.; Boyle, David R.

    2014-01-01

    Introduction: What is GNEII? • Regionally based Institution → human resource capability → Future decision makers → managers & regulators. • Education & Development → Nuclear energy infrastructure → Integrated safeguards, safety, and security (3S) → Nuclear power fundamentals. • Strategic effort → Coordinated partnership → Responsible national nuclear energy program → Regional context. Why GNEII? • Build indigenous human resources → Education, Research, Technical capacity → Integrated 3S Systems Approach - coupled with - Nuclear Energy Infrastructure. • GNEII Addresses a Need → Increased nuclear power demand → Regional Nuclear Infrastructure → GNEII is a sustainable mechanism for developing a responsible nuclear energy program

  10. 76 FR 73608 - Reliability Technical Conference, North American Electric Reliability Corporation, Public Service...

    Science.gov (United States)

    2011-11-29

    ... or municipal authority play in forming your bulk power system reliability plans? b. Do you support..., North American Electric Reliability Corporation (NERC) Nick Akins, CEO of American Electric Power (AEP..., EL11-62-000] Reliability Technical Conference, North American Electric Reliability Corporation, Public...

  11. The obscure factor analysis on the vibration reliability of the internals of nuclear power plant reactor and anti-vibration measures

    International Nuclear Information System (INIS)

    Fu Geyan; Zhu Qirong

    1998-11-01

    It is pointed out that the main reason making nuclear power plants reactors leak is the vibration of internals of reactors. The factors which lead the vibration all have randomness and obscureness. The obscure reliability theory is introduced to the vibration system of internals of nuclear power reactor. Based on a quantity of designing and moving data, the obscure factors effecting the vibration reliability of the internals of nuclear power plant reactor are analyzed and the anti-vibration reliability criteria and the evaluating model are given. And the anti-vibration reliability measures are advanced from different quarters of the machine design and building, the thermohydraulics design, the control of reactivity, etc.. They may benefit the theory and practice for building and perfecting the vibration obscure reliability model of the reactor internals

  12. A single lithium-ion battery protection circuit with high reliability and low power consumption

    International Nuclear Information System (INIS)

    Jiang Jinguang; Li Sen

    2014-01-01

    A single lithium-ion battery protection circuit with high reliability and low power consumption is proposed. The protection circuit has high reliability because the voltage and current of the battery are controlled in a safe range. The protection circuit can immediately activate a protective function when the voltage and current of the battery are beyond the safe range. In order to reduce the circuit's power consumption, a sleep state control circuit is developed. Additionally, the output frequency of the ring oscillation can be adjusted continuously and precisely by the charging capacitors and the constant-current source. The proposed protection circuit is fabricated in a 0.5 μm mixed-signal CMOS process. The measured reference voltage is 1.19 V, the overvoltage is 4.2 V and the undervoltage is 2.2 V. The total power is about 9 μW. (semiconductor integrated circuits)

  13. Evaluation and Design Tools for the Reliability of Wind Power Converter System

    DEFF Research Database (Denmark)

    Ma, Ke; Zhou, Dao; Blaabjerg, Frede

    2015-01-01

    grid. As a result, the correct assessment of reliable performance for power electronics is a crucial and emerging need; the assessment is essential for design improvement, as well as for the extension of converter lifetime and reduction of energy cost. Unfortunately, there still exists a lack...

  14. Collaborative Access Control For Critical Infrastructures

    Science.gov (United States)

    Baina, Amine; El Kalam, Anas Abou; Deswarte, Yves; Kaaniche, Mohamed

    A critical infrastructure (CI) can fail with various degrees of severity due to physical and logical vulnerabilities. Since many interdependencies exist between CIs, failures can have dramatic consequences on the entire infrastructure. This paper focuses on threats that affect information and communication systems that constitute the critical information infrastructure (CII). A new collaborative access control framework called PolyOrBAC is proposed to address security problems that are specific to CIIs. The framework offers each organization participating in a CII the ability to collaborate with other organizations while maintaining control of its resources and internal security policy. The approach is demonstrated on a practical scenario involving the electrical power grid.

  15. Power System Reliability Assessment by Analysing Voltage Dips on the Blue Horizon Bay 22KV Overhead Line in the Nelson Mandela Bay Municipality

    Science.gov (United States)

    Lamour, B. G.; Harris, R. T.; Roberts, A. G.

    2010-06-01

    Power system reliability problems are very difficult to solve because the power systems are complex and geographically widely distributed and influenced by numerous unexpected events. It is therefore imperative to employ the most efficient optimization methods in solving the problems relating to reliability of the power system. This paper presents a reliability analysis and study of the power interruptions resulting from severe power outages in the Nelson Mandela Bay Municipality (NMBM), South Africa and includes an overview of the important factors influencing reliability, and methods to improve the reliability. The Blue Horizon Bay 22 kV overhead line, supplying a 6.6 kV residential sector has been selected. It has been established that 70% of the outages, recorded at the source, originate on this feeder.

  16. Developing new methodology for nuclear power plants vulnerability assessment

    International Nuclear Information System (INIS)

    Kostadinov, Venceslav

    2011-01-01

    Research highlights: → Paper presents new methodology for vulnerability assessment of nuclear power plants. → First universal quantitative risks assessment model for terrorist attack on a NPPs. → New model enhance security, reliability and safe operation of all energy infrastructure. → Significant research benefits: increased NPPs security, reliability and availability. → Useful new tool for PRA application to evaluation of terrorist threats on NPPs. - Abstract: The fundamental aim of an efficient regulatory emergency preparedness and response system is to provide sustained emergency readiness and to prevent emergency situations and accidents. But when an event occurs, the regulatory mission is to mitigate consequences and to protect people and the environment against nuclear and radiological damage. The regulatory emergency response system, which would be activated in the case of a nuclear and/or radiological emergency and release of radioactivity to the environment, is an important element of a comprehensive national regulatory system of nuclear and radiation safety. In the past, national emergency systems explicitly did not include vulnerability assessments of the critical nuclear infrastructure as an important part of a comprehensive preparedness framework. But after the huge terrorist attack on 11/09/2001, decision-makers became aware that critical nuclear infrastructure could also be an attractive target to terrorism, with the purpose of using the physical and radioactive properties of the nuclear material to cause mass casualties, property damage, and detrimental economic and/or environmental impacts. The necessity to evaluate critical nuclear infrastructure vulnerability to threats like human errors, terrorist attacks and natural disasters, as well as preparation of emergency response plans with estimation of optimized costs, are of vital importance for assurance of safe nuclear facilities operation and national security. In this paper presented

  17. Development of reliability program for emergency diesel generators in domestic nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Young Ho; Jung, Hyun Jong; Choi, Kwang Hee; Hong, Seoung Yeul

    2001-01-01

    Surveillance tests of Emergency Diesel Generators (EDGs) in Nuclear Power Plants (NPPs) have been conducted periodically to verify the reliability and integrity of the EDGs, however, it was found that these surveillance methods were so conservative and severe as to accelerate the degradation of the EDGs. Hence, new regulatory guideline, Reg. Guide 1.9 Rev. 3, was established by the U.S. NRC to resolve these problems. But it requires the additional implementation of reliability program of the EDGs to improve the actual reliability of them. In Korea, the EDGs of Yonggwang nuclear units 3 and 4 were the first plant applying new Reg. guide 1.9 rev.3 and implementing EDG reliability program. Furthermore it is expected that new guideline for the EDGs will be applied to other EDGs of Korean NPPs. In this paper, this reliability program is described, and it can be used as a reference for other EDGs in Korean NPPs

  18. Climate and water resource change impacts and adaptation potential for US power supply

    Science.gov (United States)

    Miara, Ariel; Macknick, Jordan E.; Vörösmarty, Charles J.; Tidwell, Vincent C.; Newmark, Robin; Fekete, Balazs

    2017-11-01

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptation strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. Climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.

  19. Impacts of Extreme Space Weather Events on Power Grid Infrastructure: Physics-Based Modelling of Geomagnetically-Induced Currents (GICs) During Carrington-Class Geomagnetic Storms

    Science.gov (United States)

    Henderson, M. G.; Bent, R.; Chen, Y.; Delzanno, G. L.; Jeffery, C. A.; Jordanova, V. K.; Morley, S.; Rivera, M. K.; Toth, G.; Welling, D. T.; Woodroffe, J. R.; Engel, M.

    2017-12-01

    Large geomagnetic storms can have devastating effects on power grids. The largest geomagnetic storm ever recorded - called the Carrington Event - occurred in 1859 and produced Geomagnetically Induced Currents (GICs) strong enough to set fires in telegraph offices. It has been estimated that if such a storm occurred today, it would have devastating, long-lasting effects on the North American power transmission infrastructure. Acutely aware of this imminent threat, the North American Electric Reliability Corporation (NERC) was recently instructed to establish requirements for transmission system performance during geomagnetic disturbance (GMD) events and, although the benchmarks adopted were based on the best available data at the time, they suffer from a severely limited physical understanding of the behavior of GMDs and the resulting GICs for strong events. To rectify these deficiencies, we are developing a first-of-its-kind data-informed modelling capability that will provide transformational understanding of the underlying physical mechanisms responsible for the most harmful intense localized GMDs and their impacts on real power transmission networks. This work is being conducted in two separate modes of operation: (1) using historical, well-observed large storm intervals for which robust data-assimilation can be performed, and (2) extending the modelling into a predictive realm in order to assess impacts of poorly and/or never-before observed Carrington-class events. Results of this work are expected to include a potential replacement for the current NERC benchmarking methodology and the development of mitigation strategies in real power grid networks. We report on progress to date and show some preliminary results of modeling large (but not yet extreme) events.

  20. High-reliability computing for the smarter planet

    International Nuclear Information System (INIS)

    Quinn, Heather M.; Graham, Paul; Manuzzato, Andrea; Dehon, Andre

    2010-01-01

    The geometric rate of improvement of transistor size and integrated circuit performance, known as Moore's Law, has been an engine of growth for our economy, enabling new products and services, creating new value and wealth, increasing safety, and removing menial tasks from our daily lives. Affordable, highly integrated components have enabled both life-saving technologies and rich entertainment applications. Anti-lock brakes, insulin monitors, and GPS-enabled emergency response systems save lives. Cell phones, internet appliances, virtual worlds, realistic video games, and mp3 players enrich our lives and connect us together. Over the past 40 years of silicon scaling, the increasing capabilities of inexpensive computation have transformed our society through automation and ubiquitous communications. In this paper, we will present the concept of the smarter planet, how reliability failures affect current systems, and methods that can be used to increase the reliable adoption of new automation in the future. We will illustrate these issues using a number of different electronic devices in a couple of different scenarios. Recently IBM has been presenting the idea of a 'smarter planet.' In smarter planet documents, IBM discusses increased computer automation of roadways, banking, healthcare, and infrastructure, as automation could create more efficient systems. A necessary component of the smarter planet concept is to ensure that these new systems have very high reliability. Even extremely rare reliability problems can easily escalate to problematic scenarios when implemented at very large scales. For life-critical systems, such as automobiles, infrastructure, medical implantables, and avionic systems, unmitigated failures could be dangerous. As more automation moves into these types of critical systems, reliability failures will need to be managed. As computer automation continues to increase in our society, the need for greater radiation reliability is necessary

  1. High-reliability computing for the smarter planet

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, Heather M [Los Alamos National Laboratory; Graham, Paul [Los Alamos National Laboratory; Manuzzato, Andrea [UNIV OF PADOVA; Dehon, Andre [UNIV OF PENN; Carter, Nicholas [INTEL CORPORATION

    2010-01-01

    The geometric rate of improvement of transistor size and integrated circuit performance, known as Moore's Law, has been an engine of growth for our economy, enabling new products and services, creating new value and wealth, increasing safety, and removing menial tasks from our daily lives. Affordable, highly integrated components have enabled both life-saving technologies and rich entertainment applications. Anti-lock brakes, insulin monitors, and GPS-enabled emergency response systems save lives. Cell phones, internet appliances, virtual worlds, realistic video games, and mp3 players enrich our lives and connect us together. Over the past 40 years of silicon scaling, the increasing capabilities of inexpensive computation have transformed our society through automation and ubiquitous communications. In this paper, we will present the concept of the smarter planet, how reliability failures affect current systems, and methods that can be used to increase the reliable adoption of new automation in the future. We will illustrate these issues using a number of different electronic devices in a couple of different scenarios. Recently IBM has been presenting the idea of a 'smarter planet.' In smarter planet documents, IBM discusses increased computer automation of roadways, banking, healthcare, and infrastructure, as automation could create more efficient systems. A necessary component of the smarter planet concept is to ensure that these new systems have very high reliability. Even extremely rare reliability problems can easily escalate to problematic scenarios when implemented at very large scales. For life-critical systems, such as automobiles, infrastructure, medical implantables, and avionic systems, unmitigated failures could be dangerous. As more automation moves into these types of critical systems, reliability failures will need to be managed. As computer automation continues to increase in our society, the need for greater radiation reliability is

  2. Assessing the social sustainability contribution of an infrastructure project under conditions of uncertainty

    International Nuclear Information System (INIS)

    Sierra, Leonardo A.; Yepes, Víctor; Pellicer, Eugenio

    2017-01-01

    Assessing the viability of a public infrastructure includes economic, technical and environmental aspects; however, on many occasions, the social aspects are not always adequately considered. This article proposes a procedure to estimate the social sustainability of infrastructure projects under conditions of uncertainty, based on a multicriteria deterministic method. The variability of the method inputs is contributed by the decision-makers. Uncertain inputs are treated through uniform and beta PERT distributions. The Monte Carlo method is used to propagate uncertainty in the method. A case study of a road infrastructure improvement in El Salvador is used to illustrate this treatment. The main results determine the variability of the short and long-term social improvement indices by infrastructure and the probability of the position in the prioritization of the alternatives. The proposed mechanism improves the reliability of the decision making early in infrastructure projects, taking their social contribution into account. The results can complement environmental and economic sustainability assessments. - Highlights: •Estimate the social sustainability of infrastructure projects under conditions of uncertainty •The method uses multicriteria and Monte Carlo techniques and beta PERT distributions •Determines variability of the short and long term social improvement •Determines probability in the prioritization of alternatives •Improves reliability of decision making considering the social contribution

  3. A Survey of Wireless Communications for the Electric Power System

    Energy Technology Data Exchange (ETDEWEB)

    Akyol, Bora A.; Kirkham, Harold; Clements, Samuel L.; Hadley, Mark D.

    2010-01-27

    A key mission of the U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) is to enhance the security and reliability of the nation’s energy infrastructure. Improving the security of control systems, which enable the automated control of our energy production and distribution, is critical for protecting the energy infrastructure and the integral function that it serves in our lives. The DOE-OE Control Systems Security Program provides research and development to help the energy industry actively pursue advanced security solutions for control systems. The focus of this report is analyzing how, where, and what type of wireless communications are suitable for deployment in the electric power system and to inform implementers of their options in wireless technologies. The discussions in this report are applicable to enhancing both the communications infrastructure of the current electric power system and new smart system deployments. The work described in this report includes a survey of the following wireless technologies: • IEEE 802.16 d and e (WiMAX) • IEEE 802.11 (Wi-Fi) family of a, b, g, n, and s • Wireless sensor protocols that use parts of the IEEE 802.15.4 specification: WirelessHART, International Society of Automation (ISA) 100.11a, and Zigbee • The 2, 3, and 4 generation (G )cellular technologies of GPRS/EDGE/1xRTT, HSPA/EVDO, and Long-Term Evolution (LTE)/HSPA+UMTS.

  4. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  5. 2012 Annual Report [WESTERN AREA POWER ADMINISTRATION

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-01-01

    Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chu’s memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIP’s flagship project—the Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

  6. Validity and reliability of the look Keo power pedal system for measuring power output during incremental and repeated sprint cycling.

    Science.gov (United States)

    Sparks, S Andy; Dove, Benjamin; Bridge, Craig A; Midgely, Adrian W; McNaughton, Lars R

    2015-01-01

    Power meters have traditionally been integrated into the crank set, but several manufacturers have designed new systems located elsewhere on the bike, such as inside the pedals. This study aimed to determine the validity and reliability of the Keo power pedals during several laboratory cycling tasks. Ten active male participants (mean ± SD age 34.0 ± 10.6 y, height 1.77 ± 0.04 m, body mass 76.5 ± 10.7 kg) familiar with laboratory cycling protocols completed this study. Each participant was required to complete 2 laboratory cycling trials on an SRM ergometer (SRM, Germany) that was also fitted with the Keo power pedals (Look, France). The trials consisted of an incremental test to exhaustion followed by 10 min rest and then three 10-s sprint tests separated by 3 min of cycling at 100 W. Over power ranges of 75 to 1147 W, the Keo power-pedal system produced typical error values of 0.40, 0.21, and 0.21 for the incremental, sprint, and combined trials, respectively, compared with the SRM. Mean differences of 21.0 and 18.6 W were observed between trials 1 and 2 with the Keo system in the incremental and combined protocols, respectively. In contrast, the SRM produced differences of 1.3 and 0.6 W for the same protocols. The power data from the Keo power pedals should be treated with some caution given the presence of mean differences between them and the SRM. Furthermore, this is exacerbated by poorer reliability than that of the SRM power meter.

  7. INFRASTRUCTURE

    CERN Multimedia

    A. Gaddi

    2012-01-01

    The CMS Infrastructures teams are constantly ensuring the smooth operation of the different services during this critical period when the detector is taking data at full speed. A single failure would spoil hours of high luminosity beam and everything is put in place to avoid such an eventuality. In the meantime however, the fast approaching LS1 requires that we take a look at the various activities to take place from the end of the year onwards. The list of infrastructures consolidation and upgrade tasks is already long and will touch all the services (cooling, gas, inertion, powering, etc.). The definitive list will be available just before the LS1 start. One activity performed by the CMS cooling team that is worth mentioning is the maintenance of the cooling circuits at the CMS Electronics Integration Centre (EIC) at building 904. The old chiller has been replaced by a three-units cooling plant that also serves the HVAC system for the new CSC and RPC factories. The commissioning of this new plant has tak...

  8. Reliability Assessment Considering the Coordination of Wind Power, Solar Energy and Energy Storage

    Institute of Scientific and Technical Information of China (English)

    WANG Haiying; BAI Xiaomin; XU Jing

    2012-01-01

    Large-scale integration of wind power and solar photovoltaic (PV) power in an electric grid can result in a high operating risk due to their randomness and intermi- ttency. Energy storage (ES) can be used to coordinate with them to reduce this risk by improving supply continuity. It is therefore important to evaluate the reliability benefits of systems consist of wind power, solar photovoltaic power and energy storage. The objective of this paper is to evaluate how the parameters such as the capacity and characteristics of ES and the configuration of a hybrid generation system (HGS) affect the system adequacy based on the sequential Monte Carlo approach.

  9. Effect of Sensors on the Reliability and Control Performance of Power Circuits in the Web of Things (WoT

    Directory of Open Access Journals (Sweden)

    Sungwoo Bae

    2016-09-01

    Full Text Available In order to realize a true WoT environment, a reliable power circuit is required to ensure interconnections among a range of WoT devices. This paper presents research on sensors and their effects on the reliability and response characteristics of power circuits in WoT devices. The presented research can be used in various power circuit applications, such as energy harvesting interfaces, photovoltaic systems, and battery management systems for the WoT devices. As power circuits rely on the feedback from voltage/current sensors, the system performance is likely to be affected by the sensor failure rates, sensor dynamic characteristics, and their interface circuits. This study investigated how the operational availability of the power circuits is affected by the sensor failure rates by performing a quantitative reliability analysis. In the analysis process, this paper also includes the effects of various reconstruction and estimation techniques used in power processing circuits (e.g., energy harvesting circuits and photovoltaic systems. This paper also reports how the transient control performance of power circuits is affected by sensor interface circuits. With the frequency domain stability analysis and circuit simulation, it was verified that the interface circuit dynamics may affect the transient response characteristics of power circuits. The verification results in this paper showed that the reliability and control performance of the power circuits can be affected by the sensor types, fault tolerant approaches against sensor failures, and the response characteristics of the sensor interfaces. The analysis results were also verified by experiments using a power circuit prototype.

  10. Enabling fast charging - Infrastructure and economic considerations

    Science.gov (United States)

    Burnham, Andrew; Dufek, Eric J.; Stephens, Thomas; Francfort, James; Michelbacher, Christopher; Carlson, Richard B.; Zhang, Jiucai; Vijayagopal, Ram; Dias, Fernando; Mohanpurkar, Manish; Scoffield, Don; Hardy, Keith; Shirk, Matthew; Hovsapian, Rob; Ahmed, Shabbir; Bloom, Ira; Jansen, Andrew N.; Keyser, Matthew; Kreuzer, Cory; Markel, Anthony; Meintz, Andrew; Pesaran, Ahmad; Tanim, Tanvir R.

    2017-11-01

    The ability to charge battery electric vehicles (BEVs) on a time scale that is on par with the time to fuel an internal combustion engine vehicle (ICEV) would remove a significant barrier to the adoption of BEVs. However, for viability, fast charging at this time scale needs to also occur at a price that is acceptable to consumers. Therefore, the cost drivers for both BEV owners and charging station providers are analyzed. In addition, key infrastructure considerations are examined, including grid stability and delivery of power, the design of fast charging stations and the design and use of electric vehicle service equipment. Each of these aspects have technical barriers that need to be addressed, and are directly linked to economic impacts to use and implementation. This discussion focuses on both the economic and infrastructure issues which exist and need to be addressed for the effective implementation of fast charging at 400 kW and above. In so doing, it has been found that there is a distinct need to effectively manage the intermittent, high power demand of fast charging, strategically plan infrastructure corridors, and to further understand the cost of operation of charging infrastructure and BEVs.

  11. Verification of practicability of quantitative reliability evaluation method (De-BDA) in nuclear power plants

    International Nuclear Information System (INIS)

    Takahashi, Kinshiro; Yukimachi, Takeo.

    1988-01-01

    A variety of methods have been applied to study of reliability analysis in which human factors are included in order to enhance the safety and availability of nuclear power plants. De-BDA (Detailed Block Diagram Analysis) is one of such mehtods developed with the objective of creating a more comprehensive and understandable tool for quantitative analysis of reliability associated with plant operations. The practicability of this method has been verified by applying it to reliability analysis of various phases of plant operation as well as evaluation of enhanced man-machine interface in the central control room. (author)

  12. The development of a cislunar space infrastructure

    Science.gov (United States)

    Buck, C. A.; Johnson, A. S.; Mcglinchey, J. M.; Ryan, K. D.

    1989-01-01

    The primary objective of this Advanced Mission Design Program is to define the general characteristics and phased evolution of a near-Earth space infrastructure. The envisioned foundation includes a permanently manned, self-sustaining base on the lunar surface, a space station at the Libration Point between earth and the moon (L1), and a transportation system that anchors these elements to the Low Earth Orbit (LEO) station. The implementation of this conceptual design was carried out with the idea that the infrastructure is an important step in a larger plan to expand man's capabilities in space science and technology. Such expansion depends on low cost, reliable, and frequent access to space for those who wish to use the multiple benefits of this environment. The presence of a cislunar space infrastructure would greatly facilitate the staging of future planetary missions, as well as the full exploration of the lunar potential for science and industry. The rationale for, and a proposed detailed scenario in support of, the cislunar space infrastructure are discussed.

  13. Life cycle analysis of urban infrastructures; Toshi infrastructure seibi no lifecycle bunseki

    Energy Technology Data Exchange (ETDEWEB)

    Tagashira, N.; Uchiyama, Y. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1997-05-01

    Power supply services, city gas supply services, water supply and drainage services, roads, and buildings were treated as urban infrastructures so as to grasp the resources and CO2 emission consumed in their life cycle. Moreover, the consumption of resources for supporting one person and the emission of CO2 were analyzed to clarify an important point for resource saving and environmental load reduction. The resources used and CO2 emitted for each urban infrastructure were calculated with Kanto districts as a target. For the annual material weight a person, buildings are about 1,200 kg, roads are about 560 kg, and city gas is about 170 kg. Water supply and drainage is about 68 kg, and electric power is about 57 kg. For the annual CO2 emission a person, buildings are about 120 kg-C, roads are about 13 kg-C, and electric power is about 6.6 kg-C. City gas is about 5.3 kg-C, and water supply and drainage is about 4.4 kg-C. In the material weight for each resource, gravel, crushed stone, concrete, and asphalt concrete have a high consumption rate. In CO2 emission, iron, concrete, and gas oil form a high rate. 21 refs., 26 figs., 2 tabs.

  14. Beliefs concerning the reliability of nuclear power plant in-service inspections; Uskomuksia ydinvoimalaitoksissa suoritettavien tarkastusten luotettavuudesta

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J. [VTT Automation, Espoo (Finland)

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials` beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees` own justification. (refs.).

  15. An approach to design interface topologies across interdependent urban infrastructure systems

    International Nuclear Information System (INIS)

    Ouyang Min; Duenas-Osorio, Leonardo

    2011-01-01

    This paper proposes an approach to design or retrofit interface topologies to minimize cascading failures across urban infrastructure systems. Four types of interface design strategies are formulated based on maximum network component degree, maximum component betweenness, minimum Euclidean distance across components and component reliability rankings. To compute and compare strategy effectiveness under multiple hazard types, this paper introduces a global annual cascading failure effect (GACFE) metric as well as a GACFE-based cost improvement (GACI) metric. The GACI metric quantifies the improvement of the strategy effectiveness per kilometer increment of interdependent link length (ILL) relative to a reference strategy with minimum ILL. Taking as examples the power and gas transmission systems in Harris County, Texas, USA, optimum interface designs under random and hurricane hazards are discussed. Findings include that the strategy based on reliability rankings minimizes the GACFE metric, and decreases the GACI value relative to a reference practical strategy by 10-15% under different power grid safety margins. Such metrics will contribute to coupled utility system design or retrofit given that current guidelines or recommended practices in the utility industry mostly rely on minimum Euclidean distances and are yet to include interdependent effects in their provisions. - Highlights: → This paper offers interface topology design methods to reduce cascading failures. → Design strategies are judged by performance and cost metrics under multiple hazards. → Reliability-based interfaces globally outperform topological and distance designs. → Only low levels of extra link density and distance are needed for desired designs. → Interface distance relaxation is more effective at yielding maximum performance.

  16. Seismic proving tests on the reliability for large components and equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Ohno, Tokue; Tanaka, Nagatoshi

    1988-01-01

    Since Japan has destructive earthquakes frequently, the structural reliability for large components and equipment of nuclear power plants are rigorously required. They are designed using sophisticated seismic analyses and have not yet encountered a destructive earthquake. When nuclear power plants are planned, it is very important that the general public understand the structural reliability during and after an earthquake. Seismic Proving Tests have been planned by Ministry of International Trade and Industry (Miti) to comply with public requirement in Japan. A large-scale high-performance vibration table was constructed at Tasted Engineering Laboratory of Nuclear Power Engineering Test Center (NU PEC), in order to prove the structural reliability by vibrating the test model (of full scale or close to the actual size) in the condition of a destructive earthquake. As for the test models, the following four items were selected out of large components and equipment important to the safety: Reactor Containment Vessel; Primary Coolant Loop or Primary Loop Recirculation System; Reactor Pressure Vessel; and Reactor Core Internals. Here is described a brief of the vibration table, the test method and the results of the tests on PWR Reactor Containment Vessel and BWR Primary Loop Recirculation System (author)

  17. Ejectors of power plants turbine units efficiency and reliability increasing

    Science.gov (United States)

    Aronson, K. E.; Ryabchikov, A. Yu.; Kuptsov, V. K.; Murmanskii, I. B.; Brodov, Yu. M.; Zhelonkin, N. V.; Khaet, S. I.

    2017-11-01

    The functioning of steam turbines condensation systems influence on the efficiency and reliability of a power plant a lot. At the same time, the condensation system operating is provided by basic ejectors, which maintain the vacuum level in the condenser. Development of methods of efficiency and reliability increasing for ejector functioning is an actual problem of up-to-date power engineering. In the paper there is presented statistical analysis of ejector breakdowns, revealed during repairing processes, the influence of such damages on the steam turbine operating reliability. It is determined, that 3% of steam turbine equipment breakdowns are the ejector breakdowns. At the same time, about 7% of turbine breakdowns are caused by different ejector malfunctions. Developed and approved design solutions, which can increase the ejector functioning indexes, are presented. Intercoolers are designed in separated cases, so the air-steam mixture can’t move from the high-pressure zones to the low-pressure zones and the maintainability of the apparatuses is increased. By U-type tubes application, the thermal expansion effect of intercooler tubes is compensated and the heat-transfer area is increased. By the applied nozzle fixing construction, it is possible to change the distance between a nozzle and a mixing chamber (nozzle exit position) for operating performance optimization. In operating conditions there are provided experimental researches of more than 30 serial ejectors and also high-efficient 3-staged ejector EPO-3-80, designed by authors. The measurement scheme of the designed ejector includes 21 indicator. The results of experimental tests with different nozzle exit positions of the ejector EPO-3-80 stream devices are presented. The pressure of primary stream (water steam) is optimized. Experimental data are well-approved by the calculation results.

  18. Proceedings of the 9. IASTED international conference on power and energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Domijan, A.Jr. [Univ. of South Florida, Tampa, FL (United States)

    2007-07-01

    This conference provided an international forum for researchers and practitioners to exchange ideas and practical experience in the field of energy and power systems. The purpose was to strengthen relations between the energy sector, research laboratories and universities. Discussions focused on reliability issues in the next generation of power systems. Environmental factors and customer concerns regarding power quality issues were noted as the driving force for new concepts in electricity demand. Global and regional energy challenges ranging from energy production to power delivery were also discussed. The sessions of the conference were entitled: power system planning, investment, real time management and operations; infrastructure, reliability and weather effects; alternate energy developments and sustainability using biomass, solar and other renewable energy sources; modelling power systems, demand response and end use, and tariff issues; power quality, filtering, and experimental performance evaluations; forecasting computational methods and electronics; distribution system issues, microturbines and microgrids; and, nuclear power plants, modelling and evaluation of energy systems. All 72 presentations were catalogued separately for inclusion in this database. refs., tabs., figs.

  19. Proceedings of the 9. IASTED international conference on power and energy systems

    International Nuclear Information System (INIS)

    Domijan, A.Jr.

    2007-01-01

    This conference provided an international forum for researchers and practitioners to exchange ideas and practical experience in the field of energy and power systems. The purpose was to strengthen relations between the energy sector, research laboratories and universities. Discussions focused on reliability issues in the next generation of power systems. Environmental factors and customer concerns regarding power quality issues were noted as the driving force for new concepts in electricity demand. Global and regional energy challenges ranging from energy production to power delivery were also discussed. The sessions of the conference were entitled: power system planning, investment, real time management and operations; infrastructure, reliability and weather effects; alternate energy developments and sustainability using biomass, solar and other renewable energy sources; modelling power systems, demand response and end use, and tariff issues; power quality, filtering, and experimental performance evaluations; forecasting computational methods and electronics; distribution system issues, microturbines and microgrids; and, nuclear power plants, modelling and evaluation of energy systems. All 72 presentations were catalogued separately for inclusion in this database. refs., tabs., figs

  20. Operating reliability of valves in French pressurized water nuclear power plants

    International Nuclear Information System (INIS)

    Conte

    1986-10-01

    Taking into account the large numbers of valves (about 10000) of a PWR nuclear power plant, the importance of some valves in the safety functions and the cost resulting from their unavailability, the individual operability of these equipments has to be ensured at a high reliability level. This assurance can be obtained by means of an effort at all the stages which contribute to the quality of the product: design, qualification tests, fabrication, tests at the start-up stage, maintenance and tests during the power plant operation, experience feedback. This paper emphasizes more particularly on the tests carried out on loops of qualification [fr

  1. Application of reliability centered maintenance for nuclear power station in Japan

    International Nuclear Information System (INIS)

    Kumano, Haruyuki; Honda, Hironobu.

    1990-01-01

    The reliability centered maintenance (RCM) method has been widely used with good results in aviation companies in the U.S. to ensure positive preventive maintenance and management. In addition, the Electric Power Research Institute has been making studies and tests in an effort to apply the RCM method to nuclear power plants. The present report shows and discusses some results of a preliminary study aimed at the introduction of the RCM method to nuclear power plants in Japan. The history of the development and application of RCM is outlined first, and the procedure of its implementation is then described and discussed. The procedure consists of five major steps: collection of data, identification of system components, analysis of the functions of the system, selection of required tasks for preventive management, and packaging. Some actual examples of the application of RCM to nuclear power plants in the U.S. are described. And finally, the report discusses some major problems to be solved to permit the application of RCM to nuclear power plants in Japan. (N.K.)

  2. Reliability analysis of the automatic control of the A-1 power plant coolant temperature

    International Nuclear Information System (INIS)

    Kuklik, B.; Semerad, V.; Chylek, Z.

    Reliability analysis of the automatic control of the A-1 reactor coolant temperature is performed taking into account the effect of both the dependent failures and the routine maintenance of control system components. In a separate supplement, reliability analysis is reported of coincidence systems of the A-1 power plant reactor. Both safe and unsafe failures are taken into consideration as well as the effect of maintenance of the respective branch elements

  3. Degradation Effect on Reliability Evaluation of Aluminum Electrolytic Capacitor in Backup Power Converter

    DEFF Research Database (Denmark)

    Zhou, Dao; Wang, Huai; Blaabjerg, Frede

    2017-01-01

    DC capacitors in power electronic converters are a major constraint on improvement of power density as well as reliability. In this paper, according to the degradation data of electrolytic capacitors through the accelerated test, the time-to-failure of the capacitor cell is acquired and it can...... be further extended to lower stress levels. Then, in a case study of a fuel cell backup power application, the mission profile based lifetime expectancy of the individual capacitor and the capacitor bank is estimated in terms of the standby mode and operation mode. The lifetime prediction of the capacitor...

  4. Reliability Estimation with Uncertainties Consideration for High Power IGBTs in 2.3 MW Wind Turbine Converter System

    DEFF Research Database (Denmark)

    Kostandyan, Erik; Ma, Ke

    2012-01-01

    This paper investigates the lifetime of high power IGBTs (insulated gate bipolar transistors) used in large wind turbine applications. Since the IGBTs are critical components in a wind turbine power converter, it is of great importance to assess their reliability in the design phase of the turbine....... Minimum, maximum and average junction temperatures profiles for the grid side IGBTs are estimated at each wind speed input values. The selected failure mechanism is the crack propagation in solder joint under the silicon die. Based on junction temperature profiles and physics of failure model......, the probabilistic and determinist damage models are presented with estimated fatigue lives. Reliably levels were assessed by means of First Order Reliability Method taking into account uncertainties....

  5. Impact of distributed energy resources on the reliability of a critical telecommunications facility.

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, David; Zuffranieri, Jason V.; Atcitty, Christopher B.; Arent, Douglas (National Renewable Energy Laboratory, Golden, CO)

    2006-03-01

    This report documents a probabilistic risk assessment of an existing power supply system at a large telecommunications office. The focus is on characterizing the increase in the reliability of power supply through the use of two alternative power configurations. Telecommunications has been identified by the Department of Homeland Security as a critical infrastructure to the United States. Failures in the power systems supporting major telecommunications service nodes are a main contributor to major telecommunications outages. A logical approach to improve the robustness of telecommunication facilities would be to increase the depth and breadth of technologies available to restore power in the face of power outages. Distributed energy resources such as fuel cells and gas turbines could provide one more onsite electric power source to provide backup power, if batteries and diesel generators fail. The analysis is based on a hierarchical Bayesian approach and focuses on the failure probability associated with each of three possible facility configurations, along with assessment of the uncertainty or confidence level in the probability of failure. A risk-based characterization of final best configuration is presented.

  6. Integrated Computing, Communication, and Distributed Control of Deregulated Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Bajura, Richard; Feliachi, Ali

    2008-09-24

    Restructuring of the electricity market has affected all aspects of the power industry from generation to transmission, distribution, and consumption. Transmission circuits, in particular, are stressed often exceeding their stability limits because of the difficulty in building new transmission lines due to environmental concerns and financial risk. Deregulation has resulted in the need for tighter control strategies to maintain reliability even in the event of considerable structural changes, such as loss of a large generating unit or a transmission line, and changes in loading conditions due to the continuously varying power consumption. Our research efforts under the DOE EPSCoR Grant focused on Integrated Computing, Communication and Distributed Control of Deregulated Electric Power Systems. This research is applicable to operating and controlling modern electric energy systems. The controls developed by APERC provide for a more efficient, economical, reliable, and secure operation of these systems. Under this program, we developed distributed control algorithms suitable for large-scale geographically dispersed power systems and also economic tools to evaluate their effectiveness and impact on power markets. Progress was made in the development of distributed intelligent control agents for reliable and automated operation of integrated electric power systems. The methodologies employed combine information technology, control and communication, agent technology, and power systems engineering in the development of intelligent control agents for reliable and automated operation of integrated electric power systems. In the event of scheduled load changes or unforeseen disturbances, the power system is expected to minimize the effects and costs of disturbances and to maintain critical infrastructure operational.

  7. INFRASTRUCTURE

    CERN Multimedia

    Andrea Gaddi.

    The various water-cooling circuits ran smoothly over the summer. The overall performance of the cooling system is satisfactory, even if some improvements are possible, concerning the endcap water-cooling and the C6F14 circuits. In particular for the endcap cooling circuit, we aim to lower the water temperature, to provide more margin for RPC detectors. An expert-on-call piquet has been established during the summer global run, assuring the continuous supervision of the installations. An effort has been made to collect and harmonize the existing documentation on the cooling infrastructures at P5. The last six months have seen minor modifications to the electrical power network at P5. Among these, the racks in USC55 for the Tracker and Sniffer systems, which are backed up by the diesel generator in case of power outage, have been equipped with new control boxes to allow a remote restart. Other interventions have concerned the supply of assured power to those installations that are essential for CMS to run eff...

  8. Risk-based asset management methodology for highway infrastructure systems.

    Science.gov (United States)

    2004-01-01

    Maintaining the infrastructure of roads, highways, and bridges is paramount to ensuring that these assets will remain safe and reliable in the future. If maintenance costs remain the same or continue to escalate, and additional funding is not made av...

  9. Assessment of Lower Limb Muscle Strength and Power Using Hand-Held and Fixed Dynamometry: A Reliability and Validity Study

    Science.gov (United States)

    Perraton, Luke G.; Bower, Kelly J.; Adair, Brooke; Pua, Yong-Hao; Williams, Gavin P.; McGaw, Rebekah

    2015-01-01

    Introduction Hand-held dynamometry (HHD) has never previously been used to examine isometric muscle power. Rate of force development (RFD) is often used for muscle power assessment, however no consensus currently exists on the most appropriate method of calculation. The aim of this study was to examine the reliability of different algorithms for RFD calculation and to examine the intra-rater, inter-rater, and inter-device reliability of HHD as well as the concurrent validity of HHD for the assessment of isometric lower limb muscle strength and power. Methods 30 healthy young adults (age: 23±5yrs, male: 15) were assessed on two sessions. Isometric muscle strength and power were measured using peak force and RFD respectively using two HHDs (Lafayette Model-01165 and Hoggan microFET2) and a criterion-reference KinCom dynamometer. Statistical analysis of reliability and validity comprised intraclass correlation coefficients (ICC), Pearson correlations, concordance correlations, standard error of measurement, and minimal detectable change. Results Comparison of RFD methods revealed that a peak 200ms moving window algorithm provided optimal reliability results. Intra-rater, inter-rater, and inter-device reliability analysis of peak force and RFD revealed mostly good to excellent reliability (coefficients ≥ 0.70) for all muscle groups. Concurrent validity analysis showed moderate to excellent relationships between HHD and fixed dynamometry for the hip and knee (ICCs ≥ 0.70) for both peak force and RFD, with mostly poor to good results shown for the ankle muscles (ICCs = 0.31–0.79). Conclusions Hand-held dynamometry has good to excellent reliability and validity for most measures of isometric lower limb strength and power in a healthy population, particularly for proximal muscle groups. To aid implementation we have created freely available software to extract these variables from data stored on the Lafayette device. Future research should examine the reliability

  10. Improving the Reliability of LDP through the Divergence of Power Supply for LDP

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Bang Sil [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The representative operating systems are Large Display Panel (LDP), Operator Workstation (OWS), Computerized Procedure System (CPS). The LDP provides the information which is plant essential safety function, plant operating mode, the state of major operating variable and the important alarm to operator continuously. In case of malfunction and switchover fail of the inverter, it is possible to occur the power loss of LDP. The power of LDP and operator console workstation had been supplied by only 2 non-safety Power Line1/Power Line2 (P.L1/P.L2). This study mentioned the divergence of power for LDP as method of power loss caused by unreliability of inverter. Ultimately, LDP power line has been added, and then it is more improved on the safety of LDP operation than before. So Shin-Kori 3,4 can enhance the reliability and economic, safety of plant.

  11. Electricity Networks: Infrastructure and Operations. Too complex for a resource?

    Energy Technology Data Exchange (ETDEWEB)

    Volk, Dennis

    2013-07-01

    Electricity security remains a priority of energy policy and continuous electrification will further enhance the importance in the years to come. Market liberalisation has brought substantial benefits to societies, including competition, innovation, more client-oriented services and the reduced needs for public expenditure. Further, the path of decarbonisation is a must but experiences with many new technologies and policies show their many implications on power systems. Electricity networks form the backbone of reliable and affordable power systems and also significantly support the inception of renewable generation. The importance of distribution and transmission networks has to be well understood by policy makers and regulators to maintain the sensitive balance within the policy triangle of reliability, affordability and sustainability as power systems rapidly change. Failures in choosing the right institutions and regulatory frameworks to operate and build networks will put the sensitive balance within the policy triangle at risk. ''Too complex for a resource?'' identifies the key challenges the electricity distribution and transmission networks face today and in the future. It further provides for best practice examples on institutional design choices and regulatory frameworks for sound network service provision but also highlights the importance of additional responses required. More market-based and dynamic frameworks for various system services, the growing need for active service participation of renewable generators and highly independent and transparent central operators seem to be at the heart of these responses. ''Too complex for a resource?'' finds that the answer to the challenges ahead is not always more infrastructure and that networks and the services they provide have to be regarded as equal part of the total power system. Thus, accurate and dynamic cost allocation can significantly support to transform

  12. Long-Term Reliability of a Hard-Switched Boost Power Processing Unit Utilizing SiC Power MOSFETs

    Science.gov (United States)

    Ikpe, Stanley A.; Lauenstein, Jean-Marie; Carr, Gregory A.; Hunter, Don; Ludwig, Lawrence L.; Wood, William; Iannello, Christopher J.; Del Castillo, Linda Y.; Fitzpatrick, Fred D.; Mojarradi, Mohammad M.; hide

    2016-01-01

    Silicon carbide (SiC) power devices have demonstrated many performance advantages over their silicon (Si) counterparts. As the inherent material limitations of Si devices are being swiftly realized, wide-band-gap (WBG) materials such as SiC have become increasingly attractive for high power applications. In particular, SiC power metal oxide semiconductor field effect transistors' (MOSFETs) high breakdown field tolerance, superior thermal conductivity and low-resistivity drift regions make these devices an excellent candidate for power dense, low loss, high frequency switching applications in extreme environment conditions. In this paper, a novel power processing unit (PPU) architecture is proposed utilizing commercially available 4H-SiC power MOSFETs from CREE Inc. A multiphase straight boost converter topology is implemented to supply up to 10 kilowatts full-scale. High Temperature Gate Bias (HTGB) and High Temperature Reverse Bias (HTRB) characterization is performed to evaluate the long-term reliability of both the gate oxide and the body diode of the SiC components. Finally, susceptibility of the CREE SiC MOSFETs to damaging effects from heavy-ion radiation representative of the on-orbit galactic cosmic ray environment are explored. The results provide the baseline performance metrics of operation as well as demonstrate the feasibility of a hard-switched PPU in harsh environments.

  13. Reliability assessment of aging structures subjected to gradual and shock deteriorations

    International Nuclear Information System (INIS)

    Wang, Cao; Zhang, Hao; Li, Quanwang

    2017-01-01

    Civil structures and infrastructure facilities are susceptible to deterioration posed by the effects of natural hazards and aggressive environmental conditions. These factors may increase the risk of service interruption of infrastructures, and should be taken into account when assessing the structural reliability during an infrastructure's service life. Modeling the resistance deterioration process reasonably is the basis for structural reliability analysis. In this paper, a novel model is developed for describing the deterioration of aging structures. The deterioration is a combination of two stochastic processes: the gradual deterioration posed by environmental effects and the shock deterioration caused by severe load attacks. The dependency of the deterioration magnitude on the load intensity is considered. The Gaussian copula function is employed to help construct the joint distribution of correlated random variables. Semi-analytical methods are developed to assess the structural failure time and the number of significant load events (shocks) to failure. Illustrative examples are presented to demonstrate the applicability of the proposed model in structural reliability analysis. Parametric studies are performed to investigate the role of deterioration-load correlation in structural reliability. - Highlights: • A new resistance deterioration model for aging structures is proposed. • Time-dependent reliability analysis methods incorporating the proposed deterioration model are developed. • Parametric studies are performed to investigate the role of deterioration-load correlation in structural reliability.

  14. A cyber infrastructure for the SKA Telescope Manager

    Science.gov (United States)

    Barbosa, Domingos; Barraca, João. P.; Carvalho, Bruno; Maia, Dalmiro; Gupta, Yashwant; Natarajan, Swaminathan; Le Roux, Gerhard; Swart, Paul

    2016-07-01

    The Square Kilometre Array Telescope Manager (SKA TM) will be responsible for assisting the SKA Operations and Observation Management, carrying out System diagnosis and collecting Monitoring and Control data from the SKA subsystems and components. To provide adequate compute resources, scalability, operation continuity and high availability, as well as strict Quality of Service, the TM cyber-infrastructure (embodied in the Local Infrastructure - LINFRA) consists of COTS hardware and infrastructural software (for example: server monitoring software, host operating system, virtualization software, device firmware), providing a specially tailored Infrastructure as a Service (IaaS) and Platform as a Service (PaaS) solution. The TM infrastructure provides services in the form of computational power, software defined networking, power, storage abstractions, and high level, state of the art IaaS and PaaS management interfaces. This cyber platform will be tailored to each of the two SKA Phase 1 telescopes (SKA_MID in South Africa and SKA_LOW in Australia) instances, each presenting different computational and storage infrastructures and conditioned by location. This cyber platform will provide a compute model enabling TM to manage the deployment and execution of its multiple components (observation scheduler, proposal submission tools, MandC components, Forensic tools and several Databases, etc). In this sense, the TM LINFRA is primarily focused towards the provision of isolated instances, mostly resorting to virtualization technologies, while defaulting to bare hardware if specifically required due to performance, security, availability, or other requirement.

  15. Specification of a Human Reliability Data Bank for conducting HRA segments of PRAs for nuclear power plants

    International Nuclear Information System (INIS)

    Comer, M.K.; Donovan, M.D.

    1985-02-01

    The US Nuclear Regulatory Commission (NRC), Sandia National Laboratories (SNL), and General Physics Corporation have conducted a research program to develop a Human Reliability Data Bank for nuclear power industry probabilistic risk assessment (PRA). As part of this program, a survey of existing human reliability data banks from other industries was conducted and a concept of a Data Bank for the nuclear industry was developed. The results of these efforts were published in the two volumes of NUREG/CR-2744: ''Human Reliability Data Bank for Nuclear Power Plant Operations: Volume 1, A Review of Existing Human Reliability Data Banks, and Volume 2, A Data Bank Concept and System Description.'' This document, NUREG/CR-4010, is the revised technical specification for the Human Reliability Data Bank. The organization of the Data Bank and a description of a data publication, the Human Reliability Data Manual, are provided. Details of the administration and operation of the Data Bank are discussed. Appendices present the detailed procedures for processing data, revising the Data Manual, operating the Data Bank, and reviewing data for the Data Bank. The final appendix is a skeleton version (structure only) of the Data Manual

  16. Combining Wired and Wireless Networks for a QoS-Aware Broadband Infrastructure

    DEFF Research Database (Denmark)

    Pedersen, Jens Myrup; Riaz, Muhammad Tahir; Knudsen, Thomas Phillip

    2004-01-01

    We show how integrated planning of wired and wireless infrastructures can be used to build a QoS-aware broadband infrastructure. The outset is a case study of the municipality of Hals, a rural community in Denmark, where the objective is to establish a broadband infrastructure reaching all househ...... To The Home for primary connections and Fixed Wireless Access for backup. This is implemented over 15 years, during which temporary solutions ensure sufficient QoS and reliability for all users. These temporary solutions form parts of the final solutions....

  17. IEEE guide for general principles of reliability analysis of nuclear power generating station protection systems

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Presented is the Institute of Electrical and Electronics Engineers, Inc. (IEEE) guide for general principles of reliability analysis of nuclear power generating station protection systems. The document has been prepared to provide the basic principles needed to conduct a reliability analysis of protection systems. Included is information on qualitative and quantitative analysis, guides for failure data acquisition and use, and guide for establishment of intervals

  18. Influence of 12% Cr martensite steel quality on power generation reliability

    International Nuclear Information System (INIS)

    Smolenska, H.; Labanowski, J.; Cwiek, J.; Glowacka, M.; Serbinski, W.

    2001-01-01

    Influence of manufacturing process and heat treatment on microstructure and mechanical properties of 12% Cr heat resistance martensitic steels has been discussed. These steels are used for elevated temperatures applications like: heat and power plants, chemical and petrochemical installations. Some cases of manufacturing mistakes of steam pipelines and turbine blades had been presented. These mistakes led to imperfect microstructure resulting in reduced lifetime and insufficient reliability of installations. (author)

  19. EPRI spearheads generic PM recommendations for infrastructure equipment

    International Nuclear Information System (INIS)

    Worledge, David H.; Hinchcliffe, Glenn R.; Benak, Mark S.; Bridges, Martin

    2007-01-01

    All companies have at their core a vast amount of similar equipment that would benefit from solid preventive maintenance (PM) recommendations that are generic and easily adapted to meet operational conditions. The re-emergence of PM optimization methods like Reliability Centered Maintenance, further illustrates that companies in all industries recognize the positive influence that a well-focused maintenance program has on the corporate bottom line. The Electric Power Research Institute (EPRI) has long been a leader in providing universally adaptable maintenance solutions to meet the evolving needs of its membership. Nearly ten years ago, EPRI began developing the PM Basis Database, a one-of-a-kind repository of PM recommendations for basic infrastructure components (such as pumps, motors, valves, compressors), derived from equipment experts. EPRI has now made available this comprehensive body of knowledge to all industries. This paper will explore the origins and structure of the database, how these generic PM recommendations benefit every industry, and how they may be obtained. (author)

  20. Improving human reliability through better nuclear power plant system design. Progress report

    International Nuclear Information System (INIS)

    Golay, M.W.

    1995-01-01

    The project on open-quotes Development of a Theory of the Dependence of Human Reliability upon System Designs as a Means of Improving Nuclear Power Plant Performanceclose quotes has been undertaken in order to address the important problem of human error in advanced nuclear power plant designs. Most of the creativity in formulating such concepts has focused upon improving the mechanical reliability of safety related plant systems. However, the lack of a mature theory has retarded similar progress in reducing the likely frequencies of human errors. The main design mechanism used to address this class of concerns has been to reduce or eliminate the human role in plant operations and accident response. The plan of work being pursued in this project is to perform a set of experiments involving human subject who are required to operate, diagnose and respond to changes in computer-simulated systems, relevant to those encountered in nuclear power plants. In the tests the systems are made to differ in complexity in a systematic manner. The computer program used to present the problems to be solved also records the response of the operator as it unfolds. Ultimately this computer is also to be used in compiling the results of the project. The work of this project is focused upon nuclear power plant applications. However, the persuasiveness of human errors in using all sorts of electromechanical machines gives it a much greater potential importance. Because of this we are attempting to pursue our work in a fashion permitting broad generalizations