WorldWideScience

Sample records for power corporation annual

  1. Northwest Territories Power Corporation annual report 1991/92

    International Nuclear Information System (INIS)

    1992-06-01

    The Northwest Territories Power Corporation is a crown corporation of the government of the Northwest Territories. The Corporation operates diesel and hydroelectric production facilities to provide utility services on a self-sustaining basis in the Northwest Territories. Total revenue for 1991/92 amounted to $92,872,000 with $84,954,000 coming from the sale of power. Financial statements are presented. 3 figs

  2. Northwest Territories Power Corporation annual report 1992/93

    International Nuclear Information System (INIS)

    1993-06-01

    The Northwest Territories Power Corporation is a crown corporation of the government of the Northwest Territories. The Corporation operates diesel and hydroelectric production facilities to provide utility services on a self-sustaining basis in the Northwest Territories. Total revenue for 1992/93 amounted to $98,327,000 with $90,274,000 coming from the sale of power. Financial statements are presented. 3 figs

  3. Northwest Territories Power Corporation annual report 1999/2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    The Northwest Territories Power Corp. is a crown corporation with the responsibility to generate, transform, transmit, distribute, deliver, sell and supply electrical and heat energy throughout the Northwest Territories on a safe, economic and reliable basis. The Corporation distributes electricity directly to the consumer in most of the 52 communities it serves. It also supplies electricity on a wholesale basis to two distributing utilities which retail electricity to customers in Yellowknife and Hay River, Northwest Territories. The Corporation consists of 48 separate power systems and serves a population of 67,000 with a total load of about 90 megawatts. This report presented highlights of the 1999 safety program which included vehicle safety, safe oil transfer and contractor safety. In addition, the report highlighted the restoring of power to Sanikiluaq after the plant was destroyed by fire. Emergency measures were put into effect and power was restored in record time. In 2000, the Corporation received approval for the renewal of three Snare hydro dam licenses. In addition, new plant construction in Clyde River and Paulatuk began in the summer of 1999. The $5 million program to replace the existing cable splices on the 140 km Snare transmission line was also completed. This report also included the company's balance sheets which presented the financial position of the Corporation and the results of its operations and the changes in cash flow for the year. The net income for 1999/2000 would have been $12.1 million, the highest net income in the Corporation's history, if not for the spending of $0.4 million on its Y2K plan, and an allowance of $1 million restructuring costs to allow the Nunavut Territory to operate and manage their own electrical utility. The net earnings therefore, after considering these one-time expenditures for 1999/2000, were $10.7 million, a decrease of $0.8 million from the 1998/1999. tabs., figs.

  4. New Brunswick Power Corporation annual report, 1993/94

    International Nuclear Information System (INIS)

    1994-01-01

    Net income for New Brunswick Power in the year 1993/94 was $23.7 million, up from $1.1 million the previous year. Total revenues decreased by $7.4 million as decreases in export sales were greater than in-province load growth and due to the impacts of a 5% rate increase in 1992 and 2.9% increase in January 1994. In-province energy sales revenues totalled $732.8 million, an increase of $25.1 million from 1992/93. Residential energy sales increased by 2.1% while the those to industrial customers declined by 1.4%, due to continuing economic difficulties in the pulp and paper and mining sector. Out of province revenues decreased by $33.3 million or 19.7%, with total energy exports decreasing by 688.6 GWh to 2453.6 GWh. A significant highlight of the year was integration of the Belledune generating station onto the New Brunswick system in October. A state-of-the-art coal fired facility, Belledune will contribute 450 MW to the system. Its flue gas scrubber will reduce sulfur dioxide emissions by 90%. 6 figs., 9 tabs

  5. New Brunswick Power Corporation annual report, 1993/94

    International Nuclear Information System (INIS)

    1994-01-01

    Net income for New Brunswick Power in the year 1993/94 was $23.7 million, up from $1.1 million the previous year. Total revenues decreased by $7.4 million as decreases in export sales were greater than in-province load growth and due to the impacts of a 5% rate increase in 1992 and 2.9% increase in January 1994. In-province energy sales revenues totalled $732.8 million, an increase of $25.1 million from 1992/93. Residential energy sales increased by 2.1% while the those to industrial customers declined by 1.4%, due to continuing economic difficulties in the pulp and paper and mining sector. Out of province revenues decreased by $33.3 million or 19.7%, with total energy exports decreasing by 688.6 GWh to 2453.6 GWh. A significant highlight of the year was integration of the Belledune generating station onto the New Brunswick sytem in October. A state-of-the-art coal fired facility, Belledune will contribute 450 MW to the system. Its flue gas scrubber will reduce sulfur dioxide emissions by 90%. 6 figs., 9 tabs

  6. NUPEC (Nuclear Power Engineering Corporation) annual report 1998, activities in fiscal 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    NUPEC was founded in March, 1976 under the initiative of scholars and private corporations including electric power companies, electric machinery and general construction companies. Ever since, NUPEC has been proceeding with its operations to meet the needs of the times with the support and cooperation of the government and academic circles. The specific activities so far include solving problems in the initial stage of light water reactors(LWRs) operation, engineering tests for improvement and standardization programs to develop domestic LWRs, seismic technology development and testing, assistance with accident analysis during safety examinations by government agency, human factor research, safety analysis of nuclear facilities, research of safety-related information, countermeasures for aging of LWRs and public acceptance activities. For such purposes, NUPEC has engineering laboratories in Tadotsu, Takasago, Isogo and Katsuta as well as a high performance parallel computer system for safety analysis at its headquarters. Among these facilities, the large-scale high-performance shaking table at Tadotsu Engineering Laboratory is attracting international attention for its capability for seismic testing. NUPEC is actively promoting international cooperation with international organizations and partners in the U.S., France, Germany, Russia and Asian countries through joint projects, information exchange, etc. NUPEC`s testing and analysis have contributed to improvement of safety and credibility of Nuclear power generation and to establishment and improvement of Japanese-originated LWR technology. A summary of our achievements in fiscal 1997 is presented in this annual report. (J.P.N.)

  7. Florida Progress Corporation 1991 annual report

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Florida Progress Corporation is a utility holding company with assets of 5 billion dollars. Its principal subsidiary is the Florida Power Corporation; others are the Electric Fuels Corporation, the Mid-Continent Life Assurance Company, the Talquin Corporation, the Progress Credit Corporation and Advanced Separation Technologies Incorporated. The annual report describes achievements during the year. To meet growing energy demand Florida Power is building new peaking and base-load generating units, purchasing power from neighbouring utilities and cogenerators, and building more bulk power transmission line capacity in the state. Emphasis has been placed on meeting load growth by demand-site management. Attention is given to balancing energy needs with concerns for the environment, and there is an award-winning recycling program. The Electric Fuels Corporation major area of business is coal mining and transportation services. Advanced Separation Technologies has sold several of its patented ion separation machines. The report includes consolidated financial statements for the year ended 31 December 1991

  8. Veridian Corporation 2002 annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The Veridian Corporation is a local electricity distributor which provides power to 90,000 homes and businesses from Pickering to Belleville, Ontario. Its corporate structure includes a holding company and two subsidiaries, Veridian Energy Inc., and Veridian Connections Inc. This annual report demonstrates how community ownership has resulted in a unique relationship with the utility and customers. Through market opening, the utility brought effective management to its distribution business. A variety of performance measurement indices were implemented to improve operational efficiencies and enhance customer service. A $1 million capital dividend was declared in 2002 and the utility received a credit rating of A and A-, resulting in savings of $300,000 annually. The return on equity (ROE) was limited due to the electricity distribution rate freeze. This report described internal operations in terms of performance management goals, safety records and gain sharing. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Veridian and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs.

  9. Veridian Corporation 2002 annual report

    International Nuclear Information System (INIS)

    2002-01-01

    The Veridian Corporation is a local electricity distributor which provides power to 90,000 homes and businesses from Pickering to Belleville, Ontario. Its corporate structure includes a holding company and two subsidiaries, Veridian Energy Inc., and Veridian Connections Inc. This annual report demonstrates how community ownership has resulted in a unique relationship with the utility and customers. Through market opening, the utility brought effective management to its distribution business. A variety of performance measurement indices were implemented to improve operational efficiencies and enhance customer service. A $1 million capital dividend was declared in 2002 and the utility received a credit rating of A and A-, resulting in savings of $300,000 annually. The return on equity (ROE) was limited due to the electricity distribution rate freeze. This report described internal operations in terms of performance management goals, safety records and gain sharing. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Veridian and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  10. Stockholder Reactions to Corporate Annual Reports.

    Science.gov (United States)

    Means, Thomas Lee

    A study was conducted to assess the extent to which (1) stockholders consider corporate annual reports to be informative and useful, (2) they actually read annual reports, (3) they consider annual reports to be impressive, and (4) they are motivated by the annual report to invest further in corporations in which they already own stock. After the…

  11. Annual report of Power Reactor and Nuclear Fuel Development Corporation, fiscal year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The experimental FBR `Joyo` has continued the irradiation operation at 100 MWt. After the 11th periodic inspection, the 30th cycle operation was carried out. The cumulative operation time as of the end of the fiscal year was 51,630 hours, and the cumulative heat output was about 4.2 billion kWh. The prototype FBR `Monju` has succeeded in electric power generation in August, 1995, but the sodium leak accident occurred in December, 1995. The elucidation of the cause of the sodium leak accident and the total inspection for the safety have been carried out. As for FBRs, the research and development of the reactor physics, the design of a large FBR, the equipment systems, the fuel and materials, the structures and the safety have been advanced. The ATR `Fugen` Power Station has continued the operation smoothly, and as of the end of the fiscal year, the total generated electric power was about 17.3 billion kWh, and the capacity factor was 66.3%. It boasts about the result of using MOX fuel. The exploration of uranium resources, the development of uranium conversion, uranium enrichment and plutonium fuel, the reprocessing of spent fuel, the development of environmental technology for radioactive waste, creative and innovative research and development, safety control and safety research and others are reported. (K.I.)

  12. Ontario Energy Corporation annual report 1981. [Monograph

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The Ontario Energy Corporation's mission of providing leadership and investment capital for selected energy ventures brought its total participation in projects from $16.4 million to $669 million, and its total assets increased from $44.4 million to $693 million during the year. The annual report review major operations with Ontario Energy Resources Ltd., Onexco Ltd., Ontario Alternate Energy Ltd., Ontario Power Share Ltd., and Ontario Energy in Transportation Ltd. The financial report includes a balance sheet, income and retained earnings statement, and a summary of financial changes during the reporting period. 1 figure, 4 tables. (DCK)

  13. Australian Industry Development Corporation annual report 1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    AIDC is a statutory corporation wholly owned and guaranteed by the Commonwealth of Australia. Its objects are to promote Australian industry and Australian ownership in industry. The corporation is a financial enterprise operating on commercial principles. It is engaged in the business of borrowing money, making loans and making equity investments. It also provides related financial advisory and other services, including lead management of syndicated project financings. This annual report looks at the highlights of 1983/84; a five year summary of operations; lists the Board of Directors; some executives; includes a Directors report on development finance, industry and funds management; a management structure; statistical tables; executives and a 22 page financial statement.

  14. 76 FR 20624 - Oglethorpe Power Corporation: Proposed Biomass Power Plant

    Science.gov (United States)

    2011-04-13

    ... DEPARTMENT OF AGRICULTURE Rural Utilities Service Oglethorpe Power Corporation: Proposed Biomass Power Plant AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability of a Draft... financial assistance to Oglethorpe Power Corporation (Oglethorpe) for the construction of a 100 megawatt (MW...

  15. Electric power annual 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-06

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  16. Azure Dynamics Corporation annual report 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Azure Dynamics Corporation is an international leader in the development of proprietary hybrid electric vehicles (HEV) and electric powertrains. In 2004, the company moved its Canadian operations to Vancouver where it can develop and test its technology. Azure has developed HEV technology for the light to medium duty commercial vehicle category. In particular, its main business is the commercialization of HEV and electric vehicle (EV) control and powertrain systems for commercial vehicles (ACS Technology). In 2004, Azure announced an agreement with British-based Leyland Product Development, Zebra Batteries and Renault Trucks to produce a master electric delivery van. It also introduced the first hybrid electric taxi in London and delivered 30 vehicles in the initial phase of an agreement with Purolator that could see delivery of up to 2,000 vehicles. Azure also acquired Solectria Corporation in the United States and is currently developing a powertrain platform for vehicles in the medium-duty weight range of 7,500 to 14,000 pounds gross vehicle weight, and another powertrain for vehicles in the light-duty weight range of 5,000 to 7,5000 pounds gross vehicle weight. Commercial sales of its product is targeted for 2005. This annual report includes information on the company's net earnings and investor profiles, and includes consolidated financial statements and common share information such as assets, liabilities, revenues, expenses and cash flows. tabs., figs

  17. Electric power annual, 1990

    International Nuclear Information System (INIS)

    1992-01-01

    The Electric Power Annual presents a summary of electric utility statistics at the national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policy-makers, analysts and the general public with historical data that may be used in understanding US electricity markets. ''The Industry at a Glance'' section presents a profile of the electric power industry ownership and performance; a review of key statistics for the year; and projections for various aspects of the electric power industry through 2010. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; and electric power transactions. In addition, appendices provide supplemental data on major disturbances and unusual occurrences. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter

  18. Electric power annual, 1991

    International Nuclear Information System (INIS)

    1993-01-01

    The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. The 1991 edition has been enhanced to include statistics on electric utility demand-side management and nonutility supply. ''The US Electric Power Industry at a Glance'' section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms

  19. 78 FR 29366 - Green Mountain Power Corporation

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS04-277-002] Green Mountain Power Corporation Notice of Filing Take notice that on May 2, 2013, Green Mountain Power Corporation filed additional information in support of its request for continued waiver of Standards of Conduct. Any...

  20. 76 FR 77963 - Oglethorpe Power Corporation; Proposed Biomass Power Plant

    Science.gov (United States)

    2011-12-15

    ... Service Oglethorpe Power Corporation; Proposed Biomass Power Plant AGENCY: Rural Utilities Service, USDA... related to possible financial assistance to Oglethorpe Power Corporation's (Oglethorpe) for the... online at the following Web site: http://www.rurdev.usda.gov/UWP-OglethorpePower.html and at the: Warren...

  1. Carmanah Technologies Corporation 2004 annual report

    International Nuclear Information System (INIS)

    2005-01-01

    British Columbia-based Carmanah Technologies is a world leader in the design, manufacture and supply of patented solar-powered light emitting diode (LED) lighting solutions. As a leading alternative energy manufacturer, it was the first company to integrate LEDs with solar chargers and battery power storage. Carmanah products have high-end assembly, minimal size, maximized performance and field-proven reliability. The products have been used in public transit applications, roadway lighting, and for general aviation lighting solutions. In 2004, their products saved the equivalent of 6,705 metric tonnes of carbon dioxide. This annual report includes information on the company's net earnings and investor profiles. The company has large markets for its products with little competition. It has a strong management team and its funding places it in a position to capitalize on current and emerging technologies. The company's energy resource activities were described and an operations review was presented along with consolidated financial statements and common share information such as assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  2. TransCanada Corporation 2003 annual report

    International Nuclear Information System (INIS)

    2004-01-01

    This annual report presents financial information from TransCanada Corp., along with a review of its operations throughout 2003 and a summary of the how the company performed in terms of providing natural gas transmission and power services in North America. In 2003, TransCanada increased earnings from continuing operations by 7 per cent. It maintained a strong cash flow and continued to strengthen its balance sheet. More than 1.2 billion was invested and dividends were increased by 7 per cent in January 2004, for a total return to shareholders of 27 per cent, including dividends. In 2003, TransCanada also increased its ownership interest in Foothills Pipe Lines Ltd. to 100 per cent from 50 per cent. It secured a position in the Mackenzie Gas Pipeline Project and progressed the development of multiple liquefied natural gas projects in the northeast United States and eastern Canada. The company acquired 31.6 per cent interest in Bruce Power, adding nearly 1,500 megawatts base load generation to its portfolio. Plans are underway for cogeneration plants in Quebec, New Brunswick and Alberta. This report summarized the company's energy resource activities and presented an operations review as well as consolidated financial statements and common share information. This included the utility's assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  3. TransCanada Corporation 2004 annual report

    International Nuclear Information System (INIS)

    2005-01-01

    TransCanada is a leading North American energy company dealing with natural gas transmission, power generation and marketing opportunities. Financial information from TransCanada was presented in this annual report along with a review of its operations in 2004 and a summary of how the company performed in terms of providing natural gas transmission and power services in North America. In 2004, TransCanada increased earnings from continuing operations and maintained a strong cash flow and continued to strengthen its balance sheet. Achievements in 2004 included the acquisition of the Gas Transmission Northwest Pipeline System and the North Baja Pipeline System; the purchase of hydroelectric generation assets in New England with a total generating capacity of more than 500 MW; and the completed construction of two new gas-fired cogeneration plants, the 165 MW MacKay River facility in Alberta and the 90 MW Grandview facility in New Brunswick. The challenges in 2004 included the performance of the company's existing asset-based businesses and the new initiatives to produce another year of solid operating and financial results. This report summarized the company's energy resource activities and presented an operations review as well as consolidated financial statements and common share information. This included the utility's assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  4. Coal Corporation of Victoria annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Information is presented on operations, strategic planning, brown coal production and finance. Divisional reports are presented for the following divisions of the Coal Corporation of Victoria: marketing, technical marketing and special projects, research and development, and corporate services. The activities of the technical marketing and special projects division are discussed under the following headings: the coal for industry programme, the Brown Coal Liquefaction (Victoria) Pty. Ltd. project, dried brown coal activities, and resource development planning and policy activities. The corporation is currently conducting research into the following areas: ion exchange materials, activated carbons, and horticultural and agricultural applications of brown coal.

  5. The Importance and Usefulness of Corporate Annual Reports in Malaysia

    Directory of Open Access Journals (Sweden)

    Nazli Anum Mohd. Ghazali

    2010-01-01

    Full Text Available The purpose of this study is to examine the perceived importance and usefulness of corporate annual reports in Malaysia and to determine if there is a difference between the perceptions of preparers and users of corporate annual reports. Data for this study were collected using a questionnaire survey conducted in late 2006 and early 2007. Preparers are represented by chief financial officers while users by investment analysts. The mean scores for preparers and users are compared using the independent samples t test and the non-parametric Mann-Whitney test to determine if there are any statistically significant differences in their opinions. The findings reveal that preparers rank the annual report as the most important source of corporate information. Users, on the other hand, rank the annual report as the second most important after the visits to companies. However, the difference in the mean scores of preparers and those of users on the importance of annual reports is not significant at 5 percent level. The difference in the mean scores for the visits to companies is, on the other hand, statistically significant at 5 percent level. An implication for this finding is whether the annual report serves the information needs of analysts for decision-making purposes. An opportunity thus arises for future research to examine information needs of analysts and if there is a gap between information provided in annual reports and that required by analysts.   Keywords: corporate annual reports; disclosure; Malaysia; transparency

  6. The language of corporate annual reports

    DEFF Research Database (Denmark)

    van Leeuwen, Theo

    2013-01-01

    Corporate reports contain four distinct discourses: accounting ,finance, public relations and legal. Each recontextualizes the company's activities in distinct ways which select what actions will be represented, transform actions through the way they are worded, and add motives to actions...

  7. Environmental management in the National Power Corporation

    International Nuclear Information System (INIS)

    Petel, M.R.L.

    1996-01-01

    Environmental management in the National Power Corporation (NPC) is enshrined in the corporate charter. Environmental management practice can be traced back to the past purely hydroelectric power generation days, of the corporation. One good thing about nuclear power plant project of NPC, is that it required a formalization and documentation of environmental management, as part of the licensing procedure for the project. Thereafter, environmental management had been strengthened and institutionalized in the corporation. Succeeding years had also witnessed the escalation of the development and diversification of electricity generation sources, including the development of geothermal power, and to a small extent yet, renewable energy, such as wind power. The corporation has also intensified the installation of transmission lines of varying sizes in various locations and has gone, for now, for its internal needs, into telecommunications. With the anticipated further developments in the power sector, i.e., the ever increasing demand for power and the privitization of the power industry, new challenges loom in environmental management for the sector. The parallel developments in the environmental sciences and the collective experiences in power generation and environmental management, locally and abroad, will be very handy in meeting the challenges. The increasing stringency of environmental regulations and standards are also providing continuing challenges to all power utilities like NPC. Globally, the power scenario points towards challenging environmental management requirements, in view of the increasing complexity and gravity of environmental problems facing nations. NPC will still be a player in this scenario and therefore, will need to respond accordingly. (author)

  8. Powers and Duties of Corporate Affairs Commission

    African Journals Online (AJOL)

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  9. New Brunswick Power Nuclear Corporation update 2005

    International Nuclear Information System (INIS)

    White, R.M.; Eagles, E.R.; Pilkington, W.S.

    2005-01-01

    A brief presentation will be made on the operations and business activities over the previous year with a discussion of the current status of the NB Power group of companies. The New Brunswick Government has implemented the new 'Electricity Act' which has resulted restructuring of NB Power, opening of the electricity market to wholesale completion and the separation of the transmission system operation from NB Power. On October 1, 2005 the restructuring of NB Power was implemented to change NB Power from a single integrated utility into NB Power Holding Corporation with four subsidiary operating companies including NB Power Nuclear Corporation, NB Power Distribution and Customer Service Corporation, NB Power Transmission Corporation and NB Power Generation Corporation. As part of the Electricity Act, the transmission system reliability, operation and market control functions have been moved into a separate company, the NB System Operator, outside of the NB Power group of companies. A review of Point Lepreau's operational activities will include presentation of the capacity factor, availability and safety results with a summary of significant issues, planned outages and unplanned outages. An update on the current status of Power Reactor Operating License renewal and the strategies for renewal timing will be presented. Planning for refurbishment has continued with a major focus on addressing the recommendations made by Dr. Robin Jeffrey in his report to the Province of New Brunswick. These recommendations included three options for replacement of the Point Lepreau capacity and energy; 1) improve refurbishment contract arrangements with AECL, 2) solicit external investment in refurbishment and the station and 3) update the case for fossil fuel alternatives. The NB Power Holding Corporation Board of Directors have provided the appropriate information on the options to the owner (Province of New Brunswick) for consideration. A decision on the future of the Point Lepreau

  10. How powerful are the multinational corporations?

    OpenAIRE

    Pausenberger, Ehrenfried

    1983-01-01

    Much unease, distrust and criticism is being expressed in the current debate about the potential power of multinational corporations and the possibilities of abuse. What is the basis for the power of the multinationals, and what possibilities are available for controlling and limiting that power?

  11. Turkish Petroleum Corporation: Annual Report 2005

    International Nuclear Information System (INIS)

    2006-01-01

    A brief account of the generating electrical energy and building the most suitable generation facility activities carried out by the Turkish Petroleum Corporation, Ankara during the period January 2005 to December 2005 is presented. These activities are reported under the headings: 1) Our vision 2) Goals and objectives, strategies 3) Who we are 4) Board of directors 5) Domestic exploration and production activities 6) International exploration and production activities 7) Innovations in technology 8) Occupational safety and environmental protection 9) TPAO services 10) TPAO district Managements 11) Finance etc

  12. Subsidiary Power in Multinational Corporations

    DEFF Research Database (Denmark)

    Dörrenbächer, Christoph; Gammelgaard, Jens

    2011-01-01

    Purpose – As subsidiary power has received relatively little attention in existing research, this paper aims to enhance the understanding of genuine sources of subsidiary power and how they work in headquarters-subsidiary relationships. Design/methodology/approach – The paper is based on a review...... of the relevant literature and four illustrative case studies, which are written on the basis of secondary sources. Each case was selected because it adequately represents a particular type of power. This allows for cross-case comparisons of the strengths and sustainability of different types of power......, and facilitates the exploration of the application of subsidiary power in headquarters-subsidiary relationships. Findings – Four genuine types of subsidiary power are identified. One of these – micro-political bargaining power – plays a subtle but crucial role, as it is important in the enactment of the three...

  13. NOVA Corporation of Alberta annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Nova Corporation and its related businesses are involved in natural gas production, gas pipelines, consulting services, and upgrading of natural gas into chemicals and plastics. Nova owns Alberta Gas Transmission Division, the primary gas transportation system in Alberta, with 11,400 miles of pipeline and total deliveries in 1992 of 3.4 trillion ft 3 . Nova also owns 50% of Foothills Pipe Lines Ltd., one of Canada's largest carriers of exported gas, and 50% of TQM Pipeline Partnership, which transports natural gas in Quebec. Nova conducts its chemicals business through Novacor Chemicals Ltd., which has plants in Alberta, Ontario, Quebec, and the USA. Novacor's major petrochemicals are methanol, ethylene, propylene, and styrene and its major plastics are polystyrene, polypropylene, and polyethylene. Nova's gas-producing branch Novalta Resources produced 26 billion ft 3 of natural gas in 1992 and has proven reserves of 334 billion ft 3 . Nova's net income in 1992 was $164 million, compared to only $46 million in 1991. The company's operations, along with management discussion and analysis, are presented for 1992 and financial statements are included. 20 figs., 43 tabs

  14. The State Power Corporation of China

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    @@General Description of SP The State Power Corporation of China (SP) was established on January 16, 1997 under the approval of the State Council. As the largest power corporation in China, with 160 billion Yuan of registered capital and 1.38 million staff, SP's business scope covers generation, transmission, distribution, engineering design, construction, project management, as well as trade and financing etc. The core business of SP is power network construction and operation. SP has 146,150 km transmission lines at the voltage of 220 kV and above, which accounts for 89.5% of that in China's mainland, among which there are 26,730 km and 8,680 km of 500 kV and 330 kV respectively.Power Sources Planning,

  15. Southeastern Power Administration 2007 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2007-12-28

    Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

  16. Southeastern Power Administration 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-12-29

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agency’s programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers’ contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeastern’s cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our region’s water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeastern’s employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  17. The nuclear power corporation's foreign exchange risk management research

    International Nuclear Information System (INIS)

    Zhang Yi

    2012-01-01

    To manage and control foreign exchange rate risk under the floating exchange rate system, historical simulation method of VaR model has been utilized to evaluate the nuclear power corporation's foreign exchange risk and the risk causation has been analyzed. Finally, the measure of enhancing the nuclear power corporation's foreign exchange rate risk management level has been exposed for sharing. (author)

  18. CEO Power, Corporate Tax Avoidance and Tax Aggressiveness

    OpenAIRE

    GATOT SOEPRIYANTO

    2017-01-01

    My thesis investigates the association between CEO power, corporate tax avoidance and tax aggressiveness, using two organizational theory perspectives: self-interest and stewardship. I find that a powerful CEO engages in less corporate tax avoidance activities, which lends credence to the risk minimization motive of the stewardship perspective. My findings on the association between CEO power and tax aggressiveness show that powerful CEOs avoid risky tax avoidance strategies that expose a fir...

  19. Southwestern Power Administration Annual Report 2008

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-12-01

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  20. Balancing corporate power: a new Federalist paper.

    Science.gov (United States)

    Handy, C

    1992-01-01

    In an effort to govern their increasingly complex organizations, chief executives in some of today's largest corporations are turning to one of the world's oldest political philosophies-federalism. Given that organizations are seen more and more as minisocieties, the prospect of applying political principles to management makes a great deal of sense. Federalism is particularly appropriate because it offers a well-recognized system for dealing with paradoxes of power and control: the need to make things big by keeping them small; to encourage autonomy but within bounds; and to combine variety and shared purpose, individuality and partnership, local and global. As London Business School professor Charles Handy explains it, federalism responds to these paradoxes by balancing power among those in the center of the organization, those in the centers of expertise, and those in the center of the action--the operating businesses. The centers of federal organizations meet regularly, but they do not need to live together. Doing so would concentrate too much power in one place, whereas federalism gets its strength and energy from spreading responsibility across many decision points. Guided by five principles, federalism avoids the risks of autocracy and the overcontrol of a central bureaucracy. It ensures a measure of democracy and creates a "dispersed center" that is more a network than a place. That's why Asea Brown Boveri CEO Percy Barnevik calls his sprawling "multi-domestic" enterprise of 1,100 separate companies and 210,000 employees a federation. It succeeds because the independent bits, be they individuals, clusters, or business units, know they are part of the greater whole.

  1. Southwestern Power Administration Annual Report 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-01-01

    “Renewable energy” isn’t just a catchphrase at Southwestern Power Administration (Southwestern). It describes the hydroelectric energy we market, and the energy that Southwestern’s employees bring to work every day, constantly challenging themselves to become more eff ective and effi cient in providing aff ordable, environmentally clean power to the American people. As Southwestern’s new Administrator, I have had the opportunity to view our operations from a fresh perspective, and I’m proud to share with you how a focus on continual improvement has been evident in accomplishments throughout the agency during fi scal year (FY) 2007. When the North American Electric Reliability Corporation (NERC) implemented new reliability standards, we met applicable implementation dates and exceeded NERC’s control performance standards throughout the year. When tasked with reducing the agency’s carbon footprint, we found ways to achieve an 8.7% reduction in energy intensity from last year without impacting our operational capabilities. And when faced with record-breaking infl ows into the reservoir projects from which we market power, we capitalized on the opportunity to provide customers with signifi cant quantities of supplemental energy. Our supplemental sales this year not only saved customers over $122 million, but increased Southwestern’s revenues -- a huge win-win for Southwestern’s ratepayers and the Nation’s taxpayers alike. Southwestern is proud of its role in protecting National and economic security by contributing to the diverse supply of domestically produced energy, operating and maintaining a safe and reliable transmission system, and ensuring good stewardship of our Nation’s water resources and environment. In FY 2007, Southwestern continued to repay all power costs to the American taxpayers by marketing and delivering approximately 5.6 billion kilowatthours of hydropower at cost-based rates to customers in our six-state region. This energy

  2. Exploring the Macrostructure of Management Forewords of Corporate Annual Reports

    Directory of Open Access Journals (Sweden)

    Atefeh Mobasher

    2015-01-01

    Full Text Available Management foreword is an unedited qualitative section of Corporate Annual Reports (CARs. It is also considered as the most widely read section of CARs which may reveal the financial condition of the company. So far, only few language studies have embarked on analysis of this section and they have mainly focused on the genre content of management foreword rather than its genre structure. Nevertheless, the few genre studies conducted had several shortcomings in the model proposed. Besides, none of the previously move analysis studies on management foreword have considered corpus analysis tools in their procedure of analysis. Accordingly, the present study is aimed to bridge the gap in previous studies by describing the genre structure of management forewords. To that aim, a qualitative genre analysis study was conducted on 64 samples of management forewords of Asian companies using AntConc software. The analysis revealed six moves and nineteen move-strategy combinations. Most of the identified moves and strategies were also identified in previous move analysis studies on management forewords and other types of business reports and hence verified. The proposed move analysis model defined move boundaries and provided the most frequent words and verbs that represent each move. Additionally, the proposed moves consist of predictable strategies which are bound to their moves and do not appear within the boundary of more than one move. The findings of the present study could be useful for ESP practitioners as teaching material and raise awareness among business ESP students about the genre conventions of this genre.

  3. Lower Churchill Development Corporation Limited: 1998 annual report

    International Nuclear Information System (INIS)

    1999-06-01

    This is the 20th annual report to the Board of Directors of the Lower Churchill Development Corp. Ltd. for the year ending Dec. 31, 1998. The Corp. remains ready to proceed with hydroelectric power developments at Gull Island and/or Muskrat Falls following definitive shareholder direction. The accounting policy followed by the Corp. is in accordance with generally accepted accounting principles in Canada. It follows the practice of capitalizing the cost related to studies in respect of the development of the Lower Churchill Basis, as well administrative and other costs. Pursuant to the provisions of the Principal Agreement, Newfoundland agreed to enter into an Option Agreement, dated Nov. 24, 1978, with the Corp. in respect of the Gull Island Power Corp. Ltd. assets and the hydroelectric development rights to the Lower Churchill River. The Class A shares issued in the Corp. as of Dec. 31, 1998 are listed. Under an agreement between Hydro and the Corp., Hydro provides certain administrative and engineering services to the Corp. as needed. No fees were paid to Hydro for 2 years. In connection with the Y2K problem, management developed and is implementing a plan designed to identify and address the expected effects of the Year 2000 issue on the company

  4. Electric power annual 1995. Volume I

    International Nuclear Information System (INIS)

    1996-07-01

    The Electric Power Annual presents a summary of electric power industry statistics at national, regional, and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with data that may be used in understanding U.S. electricity markets. The Electric Power Annual is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); U.S. Department of Energy. In the private sector, the majority of the users of the Electric Power Annual are researchers and analysts and, ultimately, individuals with policy- and decisionmaking responsibilities in electric utility companies. Financial and investment institutions, economic development organizations interested in new power plant construction, special interest groups, lobbyists, electric power associations, and the news media will find data in the Electric Power Annual useful. In the public sector, users include analysts, researchers, statisticians, and other professionals with regulatory, policy, and program responsibilities for Federal, State, and local governments. The Congress and other legislative bodies may also be interested in general trends related to electricity at State and national levels. Much of the data in these reports can be used in analytic studies to evaluate new legislation. Public service commissions and other special government groups share an interest in State-level statistics. These groups can also compare the statistics for their States with those of other jurisdictions

  5. How Subsidiaries Gain Power in Multinational Corporations

    DEFF Research Database (Denmark)

    Mudambi, Ram; Pedersen, Torben; Andersson, Ulf

    2014-01-01

    in multinational firms. Data collected from 2107 foreign-owned subsidiaries in seven European countries is used to test the hypotheses. The results indicate that mutual dependence and dependence imbalance provide strong explanations for subsidiary power. Furthermore, subsidiary power over strategic decisions...... in the MNC is gained through functional power, notably the possession of technological, rather than business-related, power or by the possession of both as they reinforce each other in strengthening the subsidiary's strategic power in the MNC network...

  6. Electric power annual 1997. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Electric Power Annual 1997, Volume 2 contains annual summary statistics at national, regional, and state levels for the electric power industry, including information on both electric utilities and nonutility power producers. Included are data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold; financial statistics; environmental statistics; power transactions; and demand-side management. Also included are data for US nonutility power producers on installed capacity; gross generation; emissions; and supply and disposition of energy. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with historical data that may be used in understanding US electricity markets. 15 figs., 62 tabs.

  7. British Columbia Petroleum Corporation annual report 1992-1993

    International Nuclear Information System (INIS)

    1993-01-01

    The British Columbia Petroleum Corporation is a provincial Crown agency whose principal mandate is to facilitate and monitor the sale of natural gas, and to act as a central source of information specific to the natural gas industry for the benefit of all industry participants. The Corporation's activities for the year ending March 31, 1993 are summarized. With the devolution of the Corporation's marketing functions in 1990 to CanWest Gas Supply Inc. and the deregulation of the natural gas market, the Corporation no longer markets natural gas and byproducts, but performs a number of administrative functions on behalf of the province. These include issuing acquisition orders and determining the respective netback prices for the purpose of calculating royalties; collection of a production-related levy; collection of data regarding all sale transactions; monitoring of all production, sales and marketing costs; and information gathering for all sectors of the industry. In 1992/93, a total of 27 companies remained with the Corporation, representing 111 individual gas purchase agreements for a combined deliverability of 1,769,300 m 3 /d. At fiscal year end, a total of 713 acquisition orders were being monitored and 20 findings of producer support were issued in response to netback sales applications. Industry volume throughputs increased 8.7% over the previous year and the average netback price rose to $44.87 per 1,000 m 3 . Financial statements are included. 2 figs., 1 tab

  8. Electric power annual 1997. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Electric Power Annual presents a summary of electric power industry statistics at national, regional, and State levels. The objective of the publication is to provide industry decisionmakers, government policy-makers, analysts, and the general public with data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. Volume 1 -- with a focus on US electric utilities -- contains final 1997 data on net generation and fossil fuel consumption, stocks, receipts, and cost; preliminary 1997 data on generating unit capability, and retail sales of electricity, associated revenue, and the average revenue per kilowatthour of electricity sold (based on a monthly sample: Form EIA-826, ``Monthly Electric Utility Sales and Revenue Report with State Distributions``). Additionally, information on net generation from renewable energy sources and on the associated generating capability is included in Volume 1 of the EPA.

  9. British Columbia Petroleum Corporation annual report 1991-1992

    International Nuclear Information System (INIS)

    1992-01-01

    The British Columbia Petroleum Corporation is a gatherer, processor, analyzer and distributer of information specific to the natural gas industry. The Corporation facilitates the sale of natural gas and natural gas liquids and by-products for the benefit of the private sector. At the same time, it monitors the industry, and fulfills a compliance role for the benefit of the public sector. This report summarizes the Corporation's activities for the year ending March 31, 1992. Highlights of the year include upgrading and expansion of its computerized information system; distribution of information bulletins and newletters; a new method for calculating the netback price, recognizing the total revenues and total costs involved in marketing gas; substantial improvement of monitoring and compliance verification procedures; a total of 201 new Acquisition Orders were issued; a new Firm Service Agreement was reached with Pacific Gas Ltd. and Methanex Corporation; and the 1992/93 natural gas levy charged to producers based on their sales volumes has been set at 15.3 cents per thousand m 3 , representing a 22.7% rate reduction over 1991/92

  10. Fusion Power Associates annual meeting

    International Nuclear Information System (INIS)

    Nickerson, S.B.

    1985-03-01

    The Fusion Power Associates symposium, 'The Search for Attractive Fusion Concepts', was held January 31 - February 1 1985 in La Jolla, California. The purpose of this meeting was to bring together industry, university and government managers of the US fusion program to discuss the state of fusion development and the direction in which the program should be heading, given the cutbacks in the US fusion budget. There was a strong, minority opinion that until the best concept could be identified, the program should be broadly based. But there was also widespread criticism, aimed mainly at the largest segment of the magnetic fusion program, the tokamak. It was felt by many that the tokamak would not develop into a reactor that would be attractive to a utility and therefore should be phased out of the program. If the tokamak will indeed not lead to a commercial product then this meeting shows the US fusion program to be in a healthy state, despite the declining budgets

  11. Power Reactor Docket Information. Annual cumulation (citations)

    International Nuclear Information System (INIS)

    1977-12-01

    An annual cumulation of the citations to the documentation associated with civilian nuclear power plants is presented. This material is that which is submitted to the U.S. Nuclear Regulatory Commission in support of applications for construction and operating licenses. Citations are listed by Docket number in accession number sequence. The Table of Contents is arranged both by Docket number and by nuclear power plant name

  12. Bonneville Power Administration 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  13. Review of Studies on Corporate Annual Reports During 1990-2012

    OpenAIRE

    Atefeh Mobasher; Afida Mohamad Ali; Faiz Sathi Abdullah; Chan Mei Yuit

    2013-01-01

    Corporate Annual Reports (CARs) are corporate communication tools which have been around for 75 years. They report company’s progress, profits and losses. At first, reports were provided in English, because they were published in an English speaking context. After a while, non-English speaking companies started to publish CARs in English to attract international investments. So far studies on CARs considered themes in text and images of CARs, subgenres of CARs, rhetorical construction, discou...

  14. The news value of Dutch corporate press releases as a predictor of corporate agenda building power

    NARCIS (Netherlands)

    Schafraad, P.; van Zoonen, W.; Verhoeven, P.

    2016-01-01

    This study focuses on explaining agenda building power of corporate press releases. The purpose of the study is to investigate to what extent news factor theory can be applied to predict whether a press release generates media attention or not. A content analysis of 823 press releases from 30 of the

  15. Newfoundland Power 2003 annual report : connected to customers

    International Nuclear Information System (INIS)

    2004-01-01

    This annual report provides a corporate profile and financial information from Newfoundland Power Inc. It also includes a review of its operations for 2003 and a summary of how the electric utility performed in terms of power generation, transmission and marketing. The utility serves 222,000 customers and operates on integrated generation, transmission and distribution system throughout Newfoundland and Labrador. Results for 2003 include strong financial performance, enhanced customer service, employee excellence, safety milestones, improved system reliability and environmental diligence. Earnings were improved to $29.5 million, up from 28.8 million in 2002. The improved earnings were due to increased energy sales of 2.5 per cent in the residential sector, and lower depreciation. This report summarized the company's energy resource activities and presented an operations review as well as consolidated financial statements and common share information. This included the utility's assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  16. Board diversity and corporate voluntary disclosure (CVD in the annual reports of Bangladesh

    Directory of Open Access Journals (Sweden)

    Md. Abdur Rouf

    2016-10-01

    Full Text Available This is an exploratory study designed to investigate the extant and nature of corporate voluntary disclosure (CVD in corporate annual reports of Bangladesh. Specifically, examine the relationship between board diversity and corporate voluntary disclosures. The paper is based on a sample of 106 listed non-financial companies in Dhaka Stock Exchanges (DSE from the period 2007-2011 and all the companies are selected by Judgment Sampling. The study is used ordinary least squares regression model to examine the relationship between explanatory variables and voluntary disclosure. Using an unweighted relative disclosure index for measuring voluntary disclosure, the empirical results indicate that Percentage Female Director (PFD, Board Leadership Structure (BLS and Total Assets (TA are positively association with corporate voluntary disclosure (CVD. In contrast, the extent of corporate voluntary disclosure is negatively associated with a Percentage of equity owned by the insiders to all equity of the firm higher management ownership

  17. New Brunswick Power Corporation: Business plan, 1994-1999

    International Nuclear Information System (INIS)

    1994-02-01

    The first publicly available business plan for the New Brunswick Power Corp. is presented. The five-year plan provides an overview of the Corporation's performance and directions, including possible future rate increases. A review of the corporate history of the utility is followed by a description of the strategic framework under which the Corporation conducts its business operations. The information presented includes customer requirements, power generation and transmission, system operations, personnel management, environmental protection, and external factors affecting operations. This overview demonstrates the complex issues facing the utility, the choices made in the past, and the matters that will have to be faced in the future. The business overview is followed by focused business plans in six key functional areas (facilities, operations, personnel, technology, environment, and finances) and comprehensive financial forecasts that outline a commitment to maintain competitive rates for customers. The reasoning behind the forecasts is explained and a glossary is included. 21 figs., 16 tabs

  18. Exploring the use and users of narrative reporting in the online corporate annual report

    OpenAIRE

    Rowbottom, Nicholas; Lymer, Andew

    2010-01-01

    This paper explores the use and users of narrative reporting information contained within the corporate annual reports published online by large listed companies on the London Stock Exchange. Broadly, the study was motivated by the increasing supply of narrative reporting information and management commentary in annual reports, and the lack of empirical research investigating the use and users of this information. More specifically, there has been little investigation into who uses informatio...

  19. 10th Handelsblatt annual 'power economy' conference

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    Deregulation, internationalization, and EU enlargement within the confines of sustainability and competition were the overriding topics of this year's 10th Handelsblatt annual 'Power Economy' conference. Leading presenters from politics, industry, public authorities, and administration gave papers on these subjects for subsequent discussion. Expectations of Europe were clearly underlined. Europe has an important key function in the integration and shaping of a future energy supply system in the light of all societal, political, economic, and ecological factors. (orig.)

  20. Undergraduate Research: Three Institutions' Success Stories. Research Corporation Annual Report, 1999.

    Science.gov (United States)

    Research Corp., Tucson, AZ.

    This annual report describes the 1999 activities of Research Corporation, a foundation that supports research programs at colleges and universities in the United States and Canada. It focuses on three primarily undergraduate institutions, two private and one public, that are active producers of published research and students going into the…

  1. Rocketdyne Propulsion & Power DOE Operations Annual Site Environmental Report 1996

    Energy Technology Data Exchange (ETDEWEB)

    Tuttle, R. J. [The Boeing Company, Canoga Park, CA (United States)

    1997-11-10

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by Rocketdyne Propulsion & Power of Boeing North American. Inc. (formerly Rockwell International Corporation). These are identified as the Santa Susana Field Laboratory (SSFL and the De Soto site. The sites have been used for manufacturing; R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site essentially comprises office space and light industry with no remaining radiological operations, and has little potential impact on the environment. The SSFL site, because of its large size (2.668 acres), warrants comprehensive monitoring to ensure protection of the environment.

  2. British Coal Corporation Medical Service annual report 1988-89

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This annual report reviews the work of British Coal's Medical Service over the period 1988-89. Recruitment was at a lower level resulting in a reduction in the number of pre-employment medical examinations. Statistics are given for these, and for consultations during the year. The work of the rescue service is described. Results of surveys on the prevalence of pneumoconiosis in coal miners from 1961 to 1988 are presented in detail. The fall in prevalence continued. Continued attention has been paid to compliance with COSHH regulations, to encouraging the use of physiotherapy and to educating workers in lifting and handling methods. Following an incidence of Legionnaires Disease an investigation was carried out to identify the source of infection in an underground refrigeration plant. Studies on the mortality of coke workers have progressed. Reports are given on first aid and nursing services and on the administration of pethridine to injured miners.

  3. Yukon Energy Corporation annual report for the year ended December 31, 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The Yukon Energy Corporation (YEC) is a subsidiary of a Crown corporation of the territorial government. It generates and distributes 89% of Yukon Territory's electric power. Installed generating capacity in 1992 was 75 MW from hydroelectric plants and 44 MW from diesel generators, for a total of 119 MW. Earnings rose 20% in 1992, from $5.9 million in 1991 to $7.1 million in 1992. The rate of return on equity was 14.8%, up from 12.4% in 1991. This increase in return on equity is due in part to a reduction in the Corporation's equity at December 31, 1992 as part of a restructuring of its capital. The Corporation invested $11.6 million in system improvements during the year. This was a continuation of a program to upgrade YEC facilities. Over $27 million has been spent over the last three years. These improvements were necessary to modernize the system and to improve power quality and reliability. The Corporation completed its 1992 Resource Plan and a hearing was held with the Yukon Utilities Board in October. The plan provided a comprehensive outline of all capital planning activities, including reconnaissance, supply-side development, and demand-side management. The major environmental concern for the Corporation continued to be the management regime at the Aishihik Lake reservoir. A second year of field studies on whitefish recruitment was undertaken by the Yukon Government's Department of Renewable Resources. Financial statements are included. 7 figs

  4. Obrigheim nuclear power station. Annual report 1987

    International Nuclear Information System (INIS)

    Koerner, C.

    1988-01-01

    The Obrigheim nuclear power station was operated at full load during the year 1987; 7.351 operating hours procuded electrical energy of 2.607 GWh. This is the fifth best annual result during Obrigheim's operating period. Since commissioning in October 1968, 139.310 hours of operation have generated 46.681 GWh (gross) and from test operation in March 1969 until the end of 1987, 138.530 hours of operation have generated 46.569 GWh. This is an availability of power of 81.6% in this period and a time availability of 83.9%. In 1987, the plant was shut down for 1.222 hours for the 18th refueling including testing, inspection and repair work. Apart from refueling, the plant had a good time availability and therefore contributed 5% to the safe, economical and environmentally acceptable electricity supply of the Land Baden-Wuerttemberg. The power station is of great significance to the region, both in terms of power supply and the economy. (orig./HP) [de

  5. Electric power annual 1998. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    The purpose of this report, Electric Power Annual 1998 Volume 1 (EPAVI), is to provide a comprehensive overview of the electric power industry during the most recent year for which data have been collected, with an emphasis on the major changes that occurred. In response to the changes of 1998, this report has been expanded in scope. It begins with a general review of the year and incorporates new data on nonutility capacity and generation, transmission information, futures prices from the Commodity futures Trading commission, and wholesale spot market prices from the pennsylvania-new Jersey-Maryland Independent System Operator and the California Power Exchange. Electric utility statistics at the Census division and State levels on generation, fuel consumption, stocks, delivered cost of fossil fuels, sales to ultimate customers, average revenue per kilowatthour of electricity sold, and revenues from those retail sales can be found in Appendix A. The EPAVI is intended for a wide audience, including Congress, Federal and State agencies, the electric power industry, and the general public.

  6. The influence nuclear power has on corporate image and the effect of offering merit information of nuclear power

    International Nuclear Information System (INIS)

    Oiso, Shinichi

    2006-01-01

    Many electric power companies in Japan, irrespective of their nuclear power generation ratio's difference, have nuclear power plants. These days, corporate brand image is becoming more and more important. Therefore, a survey was carried out to study the effect that nuclear power (including comparison with the other type of industry besides electric power) has on the corporate image of an electric power company. Further more, the survey includes a research about the effect on people's attitude change towards nuclear power before and after discovering the merits or benefits of nuclear power. The possibility of enhancing the corporate brand image of electric power companies by providing merit information of nuclear power was studied. (author)

  7. 76 FR 53436 - Free Flow Power Corporation; Northland Power Mississippi River LLC; Notice of Competing...

    Science.gov (United States)

    2011-08-26

    ... Mississippi River, near the town of Luling, in St. Charles Parish, Louisiana. The sole purpose of a.... 14091-000] Free Flow Power Corporation; Northland Power Mississippi River LLC; Notice of Competing... Mississippi River LLC (Northland) filed preliminary permit applications, pursuant to section 4(f) of the...

  8. 76 FR 53427 - Free Flow Power Corporation; Northland Power Mississippi River LLC; Notice of Competing...

    Science.gov (United States)

    2011-08-26

    ... Mississippi River, near the town of Killona, in St. Charles Parish, Louisiana. The sole purpose of a.... 14092-000] Free Flow Power Corporation; Northland Power Mississippi River LLC; Notice of Competing... Mississippi River LLC (Northland) filed preliminary permit applications, pursuant to section 4(f) of the...

  9. Southeastern Power Administration 2011 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-12-31

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2011 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2010, and ending September 31, 2011. This past year, Southeastern marketed approximately 6.2 billion kilowatt-hours of energy to 489 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled more than $264 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2011. This funding, which totaled more than $45 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Currently, there are more than 214 customers participating in the funding efforts in the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems of projects. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rain placed strains on our natural and financial resources. Power purchases for FY 2011 totaled approximately $38 million. About $9 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to

  10. Southeastern Power Administration 2012 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-01-01

    Dear Secretary Moniz: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2012 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012. This past year, Southeastern marketed approximately 5.4 billion kilowatt-hours of energy to 487 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled about $263 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2012. Currently, there are more than 214 customers participating in funding infrastructure renewal efforts of powerplants feeding the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems. This funding, which totaled more than $71 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rainfall strained our natural and financial resources. Power purchases for FY 2012 in the Georgia-Alabama-South Carolina System totaled approximately $29 million. About $8 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We

  11. Annual Report 1999. Electric power in Sweden

    International Nuclear Information System (INIS)

    2000-07-01

    Power Association is of the opinion that the increase in production taxes on nuclear power is completely misdirected. Sweden is the only EU country to have production taxes on electricity. Uncertainty and the lack of stability in the present taxation system will entail considerable difficulties both for electricity-intensive industry and for the power companies vis-a-vis long-term investment in Sweden. In 1999, overall consumption in the country fell by 0.3 TWh to 142.9 TWh, compared with last year. The decrease is explained by the fact that the autumn was very warm. Inflow into the major rivers was somewhat higher than normal enabling 70.4 TWh to be generated by the hydropower plants. This is 6 TWh more than during a normal year. Nuclear power accounted for 70.2 TWh, equal to the previous year. Additionally, combined heat and power and condensing plants accounted for 9.5 TWh, almost half of which using biofuels. Wind power continues to increase. At year-end, there were about 480 wind power plants, and the annual production was 0.4 TWh. Overall electricity production in the country was 150.5 TWh, a decrease of 3.4 TWh, or just under three percent. Exports amounted to 16.1 TWh and imports to 8.5 TWh. The average price for the year on the Nordic power exchange's spot market (Sector Sweden) was SEK 0.119 per kWh. The low price is explained by the mild weather and a plentiful supply of water in the Nordic reservoirs. On 1 November, the electricity market was changed in such a way that small consumers, with a fuse rating of up to 200 amps, were also able to take part. Parliament's decision to remove the requirement for continually registering hourly meters was of crucial importance. With this measure, the electricity market was also opened up to household customers. Hourly metering was replaced by profile settlement. Customers were offered fixed prices that could be considerably lower than previously. Flexible prices were on offer, e.g. linked to the power exchange's spot

  12. 1999 Annual report: compression + power + service

    International Nuclear Information System (INIS)

    2000-01-01

    Enerflex manufactures, services and leases compression systems for the production and processing of natural gas and gas-fueled power generation systems. Design, engineering, project management, financing, installation commissioning and after-sales service are also part of Enerflex's arsenal of tools to ensure innovation, and high standards of quality and service. In 1999, Enerflex suffered an 18 per cent decline in revenues from $315 million in 1998 to $257 million in 1999, entirely due to lower sales of big ticket compression equipment in Canada. At the same time, revenues from international sales and service increased to $ 61.8 million in 1999, from $ 53 million in 1998. The company successfully completed the move to a new 328,000 sq. ft state-of-the-art manufacturing facility, and made its first significant sale to the United States in 1999 in the form of delivering a coal bed methane project in the Powder River area of Wyoming, and power generation equipment to Massachusetts. Although in the short term unusually warm average temperatures, industry cash flows, and access to capital may determine demand for the company's products and services, the long-term fundamentals are positive and demand for compression equipment and power generation systems is likely to grow. Indeed, in the fourth quarter of 1999, market conditions improved significantly and the company recorded its highest quarterly revenues and earnings during the last quarter. The annual review provides further details about the operations of the company's various divisions, (Compression and Power Systems, Parts and Compression Services, Leasing and Financing), management's review of the company's overall operations and finances, audited financial statements, and shareholders' information

  13. In their own words: how hospitals present corporate restructuring in their annual reports.

    Science.gov (United States)

    Arndt, M; Bigelow, B

    1999-01-01

    Hospitals operate in an environment with strong institutional pressures, in which legitimacy is critical to an organization's access to resources. In such an environment, organizations can increase their legitimacy by engaging in activities or discussing them in a manner that signals that the organization adheres to values held by its costituents. One important symbol of organizational actions or intentions is the formal organizational structure. When hospitals began to adopt a corporate structure in the early eighties, the way in which they presented this decision to the public was as important as the technical merits of the decision itself. This study investigates, through an analysis of annual reports, what hospitals signaled about their adoption of a corporate structure. The findings suggest that through restructuring, hospitals signaled that they were in line with practices advocated in the industry and literature (e.g., adhering to business values, protection of assets, or increasing patient services). By presenting multiple reasons for restructuring, hospitals could signal their attention to the needs of various constituents, and by touching only briefly on each reason, they could ignore the potential conflict between demands such as lower hospital cost and increased services. The findings also suggest that the first hospitals to adopt a corporate structure sought to educate constituents about restructuring by devoting a greater share of their annual report to the topic than later adopters and by enumerating a larger number of anticipated benefits from the structure, which would have enhanced the innovation's legitimacy in the early years.

  14. Southwestern Power Administration Annual Report 2004-2006

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-01-01

    Confidence Commitment Cooperation These are words that spring to mind regarding Southwestern Power Administration’s performance during fiscal years (FY) 2004-2006 By offering innovative, customer-oriented service, working to improve system reliability and efficiency, and partnering with customers and other Federal power stakeholders, Southwestern has certainly exhibited all three of these qualities during these challenging yet productive years In fact, our cooperative working relationships were critical to our success during the severe and widespread drought conditions which prevailed throughout Southwestern’s marketing area for much of 2005-2006 When we proposed a temporary energy deferral program, our customers came on board by voluntarily taking less Federal hydropower than they were entitled to, enabling us to preserve system storage and fulfill our contract obligations during the crucial summer months of 2006 The U S Army Corps of Engineers (Corps) also helped improve our drought situation by allowing Southwestern more operational flexibility on a regional level Despite the challenges this critical drought period presented, Southwestern remained committed to fulfilling our mission and strategic goals From FY 2004 through FY 2006, we marketed and delivered all available Federal hydropower while meeting and even exceeding the reliability standards of the North American Electric Reliability Corporation (NERC) Our Power Operations Training Center in Springfield, Missouri, was cited as an “Example of Excellence” during a NERC readiness audit in October 2006; and as we have every year since NERC began measuring, Southwestern far exceeded the accepted NERC compliance ratings for power system operations reliability Our commitment to excellence and accountability has kept our repayment goals on target as well Revenues were sufficient to repay all annual expenses and the required principal investment in the Federal hydropower facilities Furthermore, the original

  15. Cost structure analysis of commercial nuclear power plants in Japan based on corporate financial statements of electric utility companies

    International Nuclear Information System (INIS)

    Kunitake, Norifumi; Nagano, Koji; Suzuki, Tatsujiro

    1998-01-01

    In this paper, we analyze past and current cost structure of commercial nuclear power plants in Japan based on annual corporate financial statements published by the Japanese electric utility companies, instead of employing the conventional methodology of evaluating the generation cost for a newly constructed model plant. The result of our study on existing commercial nuclear plants reveals the increasing significance of O and M and fuel cycle costs in total generation cost. Thus, it is suggested that electric power companies should take more efforts to reduce these costs in order to maintain the competitiveness of nuclear power in Japan. (author)

  16. RISK DISCLOSURE ANALYSIS IN THE CORPORATE GOVERNANCE ANNUAL REPORT USING FUZZY-SET QUALITATIVE COMPARATIVE ANALYSIS

    Directory of Open Access Journals (Sweden)

    Pedro Carmona

    2016-05-01

    Full Text Available This paper explores the necessary and sufficient conditions of good Corporate Governance practices for high risk disclosure by firms in their Corporate Governance Annual Report. Additionally, we explore whether those recipes have changed during the financial crisis. With a sample of 271 Spanish listed companies, we applied fuzzy-set qualitative comparative analysis to a database of financial and non-financial data. We report that Board of Directors independence, size, level of activity and gender diversity, CEO duality, Audit Committee independence, being audited by the Big Four auditing firms and the presence of institutional investors are associated with high risk disclosure. The conditions included in almost every combination are the presence of institutional investors and being audited by the Big Four. We found similar combinations for 2006 and 2012, while the analysis for 2009 showed the lowest number of causal configurations.

  17. Annual Report 1999. Electric power in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-15

    . The Swedish Power Association is of the opinion that the increase in production taxes on nuclear power is completely misdirected. Sweden is the only EU country to have production taxes on electricity. Uncertainty and the lack of stability in the present taxation system will entail considerable difficulties both for electricity-intensive industry and for the power companies vis-a-vis long-term investment in Sweden. In 1999, overall consumption in the country fell by 0.3 TWh to 142.9 TWh, compared with last year. The decrease is explained by the fact that the autumn was very warm. Inflow into the major rivers was somewhat higher than normal enabling 70.4 TWh to be generated by the hydropower plants. This is 6 TWh more than during a normal year. Nuclear power accounted for 70.2 TWh, equal to the previous year. Additionally, combined heat and power and condensing plants accounted for 9.5 TWh, almost half of which using biofuels. Wind power continues to increase. At year-end, there were about 480 wind power plants, and the annual production was 0.4 TWh. Overall electricity production in the country was 150.5 TWh, a decrease of 3.4 TWh, or just under three percent. Exports amounted to 16.1 TWh and imports to 8.5 TWh. The average price for the year on the Nordic power exchange's spot market (Sector Sweden) was SEK 0.119 per kWh. The low price is explained by the mild weather and a plentiful supply of water in the Nordic reservoirs. On 1 November, the electricity market was changed in such a way that small consumers, with a fuse rating of up to 200 amps, were also able to take part. Parliament's decision to remove the requirement for continually registering hourly meters was of crucial importance. With this measure, the electricity market was also opened up to household customers. Hourly metering was replaced by profile settlement. Customers were offered fixed prices that could be considerably lower than previously. Flexible prices were on offer, e.g. linked to the

  18. Siemens Nuclear Power Corporation experience with BWR and PWR fuels

    International Nuclear Information System (INIS)

    Reparaz, A.; Smith, M.H.; Stephens, L.G.

    1992-01-01

    The large data base of fuel performance parameters available to Siemens Nuclear Power Corporation (SNP), and the excellent track record of innovation and fuel reliability accumulated over the last twenty-three years, allows SNP to have a clear insight on the characteristics of future developments in the area of fuel design. Following is a description of some of SNP's recent design innovations to prevent failures and to extend burnup capabilities. A goal paramount to the design and manufacture of BWR and PWR fuel is that of zero defects from any case during its operation in the reactor. Progress has already been made in achieving this goal. This paper summarized the cumulative failure rate of SNP fuel rod through January 1992

  19. Featuring Control Power: Corporate Law and Economics Revisited

    NARCIS (Netherlands)

    A.M. Pacces (Alessio)

    2008-01-01

    textabstractThis dissertation reappraises the existing framework for economic analysis of corporate law. The standard approach to the legal foundations of corporate governance is based on the ‘law matters’ thesis, according to which corporate law promotes separation of ownership and control by

  20. Review of Studies on Corporate Annual Reports During 1990-2012

    Directory of Open Access Journals (Sweden)

    Atefeh Mobasher

    2013-03-01

    Full Text Available Corporate Annual Reports (CARs are corporate communication tools which have been around for 75 years. They report company’s progress, profits and losses. At first, reports were provided in English, because they were published in an English speaking context. After a while, non-English speaking companies started to publish CARs in English to attract international investments. So far studies on CARs considered themes in text and images of CARs, subgenres of CARs, rhetorical construction, discourse and genre structure. During the last two decade; however, not many studies have been conducted on CARs from a language perspective. We aim to evaluate those studies and provide insight for further research. Findings of previous studies revealed that CARs consist of various sections functioning as sub-genres that have features of their own. Researchers so far have been interested in management forewords section as it is considered to be the most widely read section of CAR, which are supposed to gain the trust of readers. Other sub-genres studied include: operational and financial performance, corporate history and mission statements. As modern CARs are considered to be multimodal, images that appear in CARs have also been studied.

  1. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  2. Electric Power annual 1996: Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document presents a summary of electric power industry statistics. Data are included on electric utility retail sales of electricity, revenues, environmental information, power transactions, emissions, and demand-side management.

  3. Electric power annual 1995. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This document summarizes pertinent statistics on various aspects of the U.S. electric power industry for the year and includes a graphic presentation. Data is included on electric utility retail sales and revenues, financial statistics, environmental statistics of electric utilities, demand-side management, electric power transactions, and non-utility power producers.

  4. Powers and Duties of the Corporate Affairs Commission as a ...

    African Journals Online (AJOL)

    The Corporate Affairs Commission was established by section 1 of the Companies and Allied Matters Act, Cap C.20, Laws of the Federation of Nigeria, 2004 (CAMA). The Corporate Affairs Commission is a regulatory body, established to regulate the incorporation, running and winding up of companies, business names and ...

  5. Thermoelectron corporation: From space power to Fortune 500

    Science.gov (United States)

    Scoville, A. Nancy; Masters, Richard

    1995-01-01

    ThermoElectron Corporation was founded in 1957 to commercialize thermionic energy conversion technologies. Today the company is a Fortune 500 company with 1993 revenues of 1.2 billion. In this paper the methods ThermoElectron used to achieve this result will be discussed with emphasis on the corporate philosophy.

  6. Churchill Falls (Labrador) Corporation Limited and Twin Falls Power Corporation Limited : 1997 auditors` report and financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The consolidated balance sheet of Churchill Falls (Labrador) Corp. Ltd., and Twin Falls Power Corp. Ltd. for the year 1997 were presented by the Corporation`s auditors, certifying that the statements of income and retained earnings and changes in financial position at year-end were accurate and free of material errors. A summary of significant accounting policies was also provided. In the auditors` view the financial statements from 1997 reflect the financial position of the companies accurately. Corresponding data from 1996 were included to allow for comparisons. tabs.

  7. 77 FR 59679 - Central Vermont Public Service Corporation (Millstone Power Station, Unit 3); Order Approving...

    Science.gov (United States)

    2012-09-28

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0044; Docket No. 50-423] Central Vermont Public Service Corporation (Millstone Power Station, Unit 3); Order Approving Application Regarding Corporate Restructuring and Conforming Amendment I Dominion Nuclear Connecticut, Inc. (DNC), Central Vermont Public Service...

  8. The making of a transnational capitalist class: corporate power in the twenty-first century

    NARCIS (Netherlands)

    Carroll, W.K.; Carson, C.; Fennema, M.; Heemskerk, E.; Sapinski, J.P.

    2010-01-01

    Throughout the world, there has been a growing wave of interest in global corporate power and the rise of a transnational capitalist class, triggered by economic and political transformations that have blurred national borders and disembedded corporate business from national domiciles. Using social

  9. Thermal Energy Corporation Combined Heat and Power Project

    Energy Technology Data Exchange (ETDEWEB)

    Turner, E. Bruce [Thermal Energy Corporation, Houston, TX (United States); Brown, Tim [Thermal Energy Corporation, Houston, TX (United States); Mardiat, Ed [Burns and McDonnell Engineering Company, Inc., Kansas City, MI (United States)

    2011-12-31

    To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power

  10. Corporate Citizenship and Stakeholder Engagement : Maintaining an Equitable Power Balance

    OpenAIRE

    Ihugba, Bethel Uzoma; Osuji, Onyeka K.

    2011-01-01

    This paper proposes an engagement oriented corporation-stakeholder relationship in Corporate Social Responsibility (CSR) programmes. It is a proposition which poses the two connected questions of how to move from solely public relation driven stakeholder management to social development oriented stakeholder participation (engagement) and how Stakeholder Engagement can be measured. On the backdrop of Arnstein’s (1969) citizenship participation model and reasons for Stakeholder Engagement frame...

  11. Bonneville Power Administration 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  12. Electric power industry restructuring and ROE: The case of Korea Electric Power Corporation

    International Nuclear Information System (INIS)

    Won, Gu-Hwan

    2007-01-01

    Korea's electric power industry was previously run by Korea Electric Power Corporation (KEPCO) in a natural monopoly-type structure. As economy of scale was waning in influence and management effectiveness began to increase in importance, KEPCO was divided into six subsidiaries and faced competition beginning in April 2001. This study evaluates the restructuring process for Korea's power industry and analyzes the financial outcomes based on return on equity (ROE). The results show that the ROE ratio increased. In the analysis period (1993-2004), the financial ratio showed a better performance than that before restructuring. However, productivity ratios such as productivity of capital (or gross value added to total assets) and gross value added to property, plant, and equipment decreased compared to the situation before restructuring. It is believed that the results were due to the increased financial leverage of KEPCO. For this reason, KEPCO should make further efforts to manage its debt in a systematic way

  13. Electric power annual 1989. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-17

    This publication presents a summary of electric utility statistics at the national, regional and state levels. The Industry At A Glance'' section presents a profile of the electric power industry ownership and performance; a review of key statistics for the year; and projections for various aspects of the electric power industry through 2010. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue and average revenue per kilowatthour sold; financial statistics; environmental statistics; and electric power transactions. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. 24 figs., 57 tabs.

  14. CSR as Corporate Power. A Communication View Facebook Approach: An Exploratory Study

    OpenAIRE

    Anca Diana ȘERBAN

    2016-01-01

    This article aims to operationalize and measure the power of corporate communication and the main strategies that Romanian companies use to communicate their CSR campaigns on Facebook. The study conducts an extensive survey designed to emphasize the corporate communication indicators of power within CSR communication on Facebook and their correlation with the CSR communication strategy used by the first 100 biggest companies in Romania according to their turnover. The most important findings ...

  15. Annual report 2006 - CPFL Energy - Light and Power Company from Sao Paulo, SP

    International Nuclear Information System (INIS)

    2006-01-01

    This document reports the activities during 2006 of the Sao Paulo Light and Power (CPFL) as follows: society evolution, corporative and ethic management; economic and financial performance; operational performance, sustainability management and corporative responsibility

  16. Slovak power stations (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Slovak power stations, s.a. (SE) in 1997 is presented. These activities are reported under the headings: (1) Foreword of the chairman of the Board of directors; (2) Highlights of 1997; (3) Board of directors; (4) Supervisory board; (5) Organisation structure of SE; (6) Branches of SE; (7) Auditor's report; (8) Balance sheet / Economic balance; (9) Economic results; (10) Analysis of economic result; (11) SE capital investment in other trade companies; (12) Basic data; (13) Management and operation of the Slovak Republic's power system; (14) Labour safety and health, fire protection; (15) Electricity trade; (16) Trade heat; (17) Customer services provided to electricity users (18) Investment programme; (19) Environmental protection; (20) Support of renewable; (21) Nuclear safety; (22) Quality system; (23) International co-operation; (24) Centrel; (25) Information technology; (26) Public relations; (27) Business strategy and development programme; (28) Strategic change programme

  17. TransAlta Corporation 1996 annual report : new directions, new opportunities

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    TransAlta Corp. is an energy management company that operates through two subsidiaries: (1) TransAlta Utilities Corp. which owns and operates electricity generation, transmission and distribution assets in Alberta, and (2) TransAlta Energy Corp. which is in the business of electric and thermal energy supply, gas and electricity distribution, energy services and energy marketing in regions of Canada, New Zealand, Australia, Argentina and the United States. This report presents a summary of operations, and provides consolidated financial statements and common share information for 1996. During the year the corporation advanced three significant initiatives (1) operational effectiveness, as shown by impressive productivity increases, and major investments in three independent power projects, (2) improved strategic direction through a review of plans and options, resulting in a clearer, more focused vision of the future, and (3) realignment of the organizational structure by centralizing marketing and sales functions, and establishing a corporate business development group. Details of operational and financial results were provided for both subsidiaries, i. e. TransAlta Utilities and TransAlta Energy. Sales of electric energy for TransAlta Utilities amounted to 27.8 billion kWh; 4.6 billion kWh for TransAlta Energy. Return on equity was 11.4 per cent, down from 11.8 per cent in 1995. Net earnings per common share were $1.14 per share (including one-time items), the same as in 1995. tabs., figs

  18. Southwestern Power Administration Annual Report 2012

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  19. Southwestern Power Administration Annual Report 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-09-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  20. Southwestern Power Administration Annual Report 2011

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-04-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  1. BUSINESSES WITHOUT BOUNDARIES: A GEOGRAPHY OF CORPORATE POWER

    Directory of Open Access Journals (Sweden)

    Rozalia Iuliana KICSI

    2016-08-01

    Full Text Available During the last decades, the literature on international business reflects a growing interest in the extension of the corporate networks and the status of the multinational corporations in the global economy. Firstly, in this study, we briefly summarize several aspects regarding to the strategic focus of the multinational corporations on the global market. Secondly, we intend to map business extension in the international environment from the perspective of regional concentration. In this regard, for each region we have aggregated the key performance indicators (assets, sales and employees which reflect the magnitude of the activities of the companies included by UNCTAD in the Top 100 non-financial TNCs outside the home economic environment. Also, based on the algorithm for calculating the Transnationality Index we estimated an aggregate index for each home region of these companies. The main conclusion drawn from the study is that Europe is the most internationalised region; this tendency is underlined both by the value of the Transnationality Index at regional level and by the total value of the assets hold abroad by the companies which have the home location in the European economic environment. At the same time, from all the developed regions, Europe is the most attractive location for the implantation of the multinational corporations from outside. During the last decades, the literature on international business reflects a growing interest in the extension of the corporate networks and the status of the multinational corporations in the global economy. Firstly, in this study, we briefly summarize several aspects regarding to the strategic focus of the multinational corporations on the global market. Secondly, we intend to map business extension in the international environment from the perspective of regional concentration. In this regard, for each region we have aggregated the key performance indicators (assets, sales and employees which

  2. The Financial Performance (Profitability and Corporate Governance Disclosure in the Annual Reports of Listed Companies of Bangladesh

    Directory of Open Access Journals (Sweden)

    Abdur Rouf

    2011-12-01

    Full Text Available This research aims to test empirically the relationship between the Financial Performances (Profitability and the level of Corporate Governance Disclosure (CGD by the listed non-financial companies in Bangladesh. Data are taken from annual reports of the listed companies in the 2007. This paper is based on a sample of 94 listed companies and Used OLS as a method of estimation. The extent of corporate governance disclosure level is measured using 40 items of information and financial performance (profitability is measured by return on assets (ROA. Using an unweighted approach for measuring corporate governance disclosure, this approach is most appropriate when no importance is given to any specific user-groups. After establishing the disclosure index, a scoring sheet was developed to assess the extent of corporate governance disclosures. The result shows that the Financial Performances (Profitability and Board Audit Committee are positively correlated with the level of Corporate Governance Disclosure (CGD. Percentage of Equity Owned by the Insiders is negatively associated with the Corporate Governance Disclosure. The study provides empirical evidence to policy makers and regulators in South Asia.

  3. Ardennes nuclear power plant. Annual report 1975

    International Nuclear Information System (INIS)

    1977-05-01

    At the beginning of the year 1975 the nominal power of the nuclear plant of the Ardennes was brought from 950 up to 1040 MWth, after a positive decision of the official safety organizations. Net energy produced: 2016 GWh, number of coupled hours: 6832 h, coefficient of availability: 75%, total number of standstills: 25. The functioning of the installations is, on the whole, very satisfying. Liquid wastes are clearly inferior to admissible maximum limits. The cost per KWh of the plant amounts to 5.57 French centimes. For the last 5 years net production has reached 9375 GWh, which means an average coefficient of availability of 76.7%

  4. Slovak Power Plants, Annual Report 2000

    International Nuclear Information System (INIS)

    2001-01-01

    A brief report of activities carried out by the Slovenske elektrarne, a.s., in 2000 is presented. These activities are reported under the headings: Address by the Chairman of the board of directors; Major events; Board of directors; Supervisory board; Business strategy and development programme; Organisational structure; Equity investments in other companies; Basic data on generation units; Management and operation of the Slovak Republic's power systems; Transmission system of the Slovak Republic; Electricity sales; Heat sales; Safety at work and health protection and fire protection; Customer services; Investment programme; Research and development; Environmental protection; Nuclear safety; International co-operation; Human resources; Information systems; Telecommunications; Auditor report; Balance sheet

  5. 2012 Annual Report [WESTERN AREA POWER ADMINISTRATION

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-01-01

    Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chu’s memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIP’s flagship project—the Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

  6. Electric power annual 1994. Volume 2, Operational and financial data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-28

    This year, the annual is published in two volumes. Volume I focused on US electric utilities and contained final 1994 data on net generation, fossil fuel consumption, stocks, receipts, and cost. This Volume II presents annual 1994 summary statistics for the electric power industry, including information on both electric utilities and nonutility power producers. Included are preliminary data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold (based on form EIA-861) and for electric utility financial statistics, environmental statistics, power transactions, and demand- side management. Final 1994 data for US nonutility power producers on installed capacity and gross generation, as well as supply and disposition information, are also provided in Volume II. Technical notes and a glossary are included.

  7. Scottish Power Annual Report and Accounts - 1996-97

    International Nuclear Information System (INIS)

    1997-01-01

    The annual report and accounts of Scottish Power for 1996-97 outlines the operational and financial highlights of the year, and presents the reports of the Chairman and other Directors. Details are given of the financial year, the accounting policy, profits and losses, and company and shareholder information. (UK)

  8. Kennecott Utah Copper Corporation: Facility Utilizes Energy Assessments to Identify $930,000 in Potential Annual Savings

    Energy Technology Data Exchange (ETDEWEB)

    2004-07-01

    Kennecott Utah Copper Corporation (KUCC) used targeted energy assessments in the smelter and refinery at its Bingham Canyon Mine, near Salt Lake City, Utah. The assessment focused mainly on the energy-intensive processes of copper smelting and refining. By implementing the projects identified, KUCC could realize annual cost savings of $930,000 and annual energy savings of 452,000 MMBtu. The projects would also reduce maintenance, repair costs, waste, and environmental emissions. One project would use methane gas from an adjacent municipal dump to replace natural gas currently used to heat the refinery electrolyte.

  9. Unregulated generation relationships at Niagara Mohawk Power Corporation

    International Nuclear Information System (INIS)

    Schrayshuen, H.

    1995-01-01

    This paper examines the contractual and mandated power generation pricing relationships between an electric utility and unregulated power generation stations. The topics of the paper include types of generation facilities, current capacity of unregulated generators, rights to power markets, utility planning, responding to a changing market, power purchase agreement relationships, enforcement and renegotiation

  10. A centennial book of Korea electric power corporation

    International Nuclear Information System (INIS)

    1989-12-01

    This book gives description of KEPC with power and life such as lighting, electric power, electric heat and communication, introduction of electric civilization, establishment and manage of Hansung electric company on opening of electric train, regulation of the train, opening of lamp business, construction of Yongsan generator, the Japanese invasion with trouble of supplying electricity, control over power business and development of water power generation, division of Korea and Korea war on damage out of Korea war and rebuild, development and growth on establishment of Korea electric power, establishment of Korea electric power by private and water power development project, stability and development, and challenge for future.

  11. Slovak power stations, Nuclear Power Plants Mochovce (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Mochovce in 1997 is presented. These activities are reported under the headings: (1) Director's foreword; (2) Power plant management; (3) Highlights of 1997; (4) Capital construction; (5) Nuclear safety; (6) Radiation safety; (7) Work safety and health protection at work; (9) Fire protection; (10) Units upgrading - safety measures; (11) Maintenance; (12) Operation; (13) Environmental impacts of operations; (14) List of balances; (15) Human sources; (16) International co-operation; (17) Public relations

  12. The energy behind the power. Southwestern Power Administration 1994 annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This is the Southwestern Power Administration 1994 annual report. The topics of the report include a letter to the secretary; an overview including the mission statement, a description of the Southwestern Federal Power System, financial statement, performance measurements, national performance review; year in review, summary of results, financial and statistical data and the Southwestern Power Administration Organization.

  13. 78 FR 50409 - Kansas Municipal Energy Agency v. Sunflower Electric Power Corporation, Mid-Kansas Electric...

    Science.gov (United States)

    2013-08-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL13-84-000] Kansas Municipal Energy Agency v. Sunflower Electric Power Corporation, Mid-Kansas Electric Company, LLC, Southwest... 306 of the Federal Power Act, 16 U.S.C. 824e and 825e and Rule 206 of the Federal Energy Regulatory...

  14. New technology and organizational innovation: Niagara Mohawk Power Corporation and nuclear power

    International Nuclear Information System (INIS)

    Stacey, J.E. Jr.

    1981-01-01

    Questions with regard to organization behavior and decision theory are explored in relation to the decision-making process of a major private electric utility, Niagara Mohawk Power Corp., that chose to innovate with nuclear power. The character of the firm is such, relative to size, service area, organizational structure, and socio-political environment, that its experience is important for the further development of theories of organizational innovation. The research attempts to understand the political, economic, and social constraints that limited the set of solutions available to the utility in its search for a suitable electricity-generating mode from the early 1950's to the early 1960's. Two contrasting models of organizational decision-making behavior are used to interpret case-study findings. The initial model is from the electric-utility literature and consists essentially of an economic or benefit/cost model of organizational decision making. The second model is developed from the organizational theory literature and is more complex in the sense that factors other than economics such as organizational inertia, the corporate structure of the utility, fuel-supply history and fuel diversification, electricity-demand-growth expectations, the financial environment, and the psychological appeal of the new technology had important influences on Niagara Mohawk's decision to build Nine Mile Point One. Findings of the case study tend to support the second model in that economics was a necessary but not sufficient reason for Niagara Mohawk to have innovated with nuclear power plants

  15. Implementing agreement on photovoltaic power systems - Annual report 2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2006. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the performance, reliability and analysis of photovoltaic systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries, urban-scale PV applications and hybrid systems within mini-grids. The status and prospects in the 21 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  16. Implementing agreement on photovoltaic power systems - Annual report 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2007. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the performance, reliability and analysis of photovoltaic systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries, urban-scale PV applications, hybrid systems within mini-grids and PV environmental health and safety activities. The status and prospects in the 22 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  17. Implementing agreement on photovoltaic power systems - Annual report 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2004. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the performance, reliability and analysis of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries and urban-scale PV applications. The status and prospects in the 21 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  18. Implementing agreement on photovoltaic power systems - Annual report 2008

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2008. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries, urban-scale PV applications, hybrid systems within mini-grids as well as health and safety activities. The status and prospects in the 23 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the performance, reliability and analysis of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  19. Implementing agreement on photovoltaic power systems - Annual report 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2004. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the performance, reliability and analysis of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries and urban-scale PV applications. The status and prospects in the 21 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  20. Implementing agreement on photovoltaic power systems - Annual report 2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2006. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the performance, reliability and analysis of photovoltaic systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries, urban-scale PV applications and hybrid systems within mini-grids. The status and prospects in the 21 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  1. Implementing agreement on photovoltaic power systems - Annual report 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2007. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the performance, reliability and analysis of photovoltaic systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries, urban-scale PV applications, hybrid systems within mini-grids and PV environmental health and safety activities. The status and prospects in the 22 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  2. Implementing agreement on photovoltaic power systems - Annual report 2008

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2008. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries, urban-scale PV applications, hybrid systems within mini-grids as well as health and safety activities. The status and prospects in the 23 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the performance, reliability and analysis of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  3. Implementing agreement on photovoltaic power systems - Annual report 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2005. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the performance, reliability and analysis of photovoltaic systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries and urban-scale PV applications. The status and prospects in the 21 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  4. Implementing agreement on photovoltaic power systems - Annual report 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2005. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the performance, reliability and analysis of photovoltaic systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries and urban-scale PV applications. The status and prospects in the 21 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  5. Implementing agreement on photovoltaic power systems - Annual report 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2000. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed. Status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the operational performance and design of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, the grid interconnection of building-integrated and other distributed photovoltaic power systems, photovoltaic power systems in the built environment, very large scale photovoltaic power generation systems and the deployment of photovoltaic technologies in developing countries. The status and prospects in the 20 countries participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. The report is completed with a list of Executive Committee members and Operating Agents.

  6. Implementing agreement on photovoltaic power systems - Annual report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2001. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed. Status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the operational performance, maintenance and sizing of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, photovoltaic power systems in the built environment, a study on very large scale photovoltaic power generation system and the deployment of photovoltaic technologies in developing countries. The status and prospects in the 20 countries participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. The report is completed with a list of Executive Committee members and Operating Agents.

  7. Implementing agreement on photovoltaic power systems - Annual report 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2003. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed. The programme's tenth anniversary is noted. Status reports on the programme's various tasks and sub-tasks are presented. The tasks include the exchange and dissemination of information on photovoltaic power systems, the operational performance, maintenance and sizing of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, photovoltaic power systems in the built environment, a study on very large scale photovoltaic power generation system, the deployment of photovoltaic technologies in developing countries and urban-scale PV applications. The status and prospects in the 20 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. The report is completed with a list of Executive Committee members and Operating Agents.

  8. Nuclear power plant operating experience. Annual report, 1978

    International Nuclear Information System (INIS)

    Beebe, M.R.

    1979-12-01

    This report is the fifth in a series of reports issued annually that summarizes the operating experience of US nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure for each plant are presented. Summary highlights of these areas are discussed. The report includes 1978 data from 65 plants - 25 boiling water reactor plants and 40 pressurized water reactor plants. Discussion of radioactive effluents which has been a part of this report in previous years, has not been included in this issue because of late acquisition of data

  9. Demand for power in Calcutta Electricity Supply Corporation area

    Energy Technology Data Exchange (ETDEWEB)

    Banerjee, N

    1980-07-01

    Since the early 1970's there has been a continuous crisis of power supply to the Calcutta industrial region. Historical records show that only the peak demand has grown and has a potential for growth, which, with an unchanging base demand, results in a low load factor and consequently inefficient power system operation. Attempts to shift industrial loads by operating industrial plants during non-peak hours are described. Adverse economic conditions eliminated the need for extra working shifts. It is concluded that the power system supplying the Calcutta region has an insufficient peak load generating capacity and an uneconomic load curve and that stricter hourly schedules for power use by industries should be adhered to in order to minimize these problems. (LCL)

  10. Implementing agreement on photovoltaic power systems - Annual report 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This annual report for the International Energy Agency (IEA) reports on the programme's activities in 2009. The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative research and development agreements established within the IEA. Its mission is to enhance international collaboration efforts which support the development and deployment of photovoltaic solar energy. In this annual report, the programme's mission and its strategies for reaching four objectives are reviewed and status reports on the programme's various tasks and sub-tasks are presented, as are activities planned for 2010. The tasks include the exchange and dissemination of information on photovoltaic power systems, a study on very large scale photovoltaic power generation system, photovoltaic services for developing countries, urban-scale PV applications, hybrid systems within mini-grids, PV environmental health and safety activities, performance and reliability of PV systems and high penetration PV in electricity grids. The status and prospects in the 23 countries and organisations participating in the programme are presented. Along with country-specific topics, industry activities, research, development and demonstration projects, applications, education and governmental activities as well as future activities are reviewed. Finally, completed tasks are reviewed. These include the performance, reliability and analysis of photovoltaic systems, the use of photovoltaic power systems in stand-alone and island applications, grid interconnection of building integrated and other distributed photovoltaic power systems, design and operation of modular photovoltaic plants for large scale power generation and photovoltaic power systems in the built environment. The report is completed with a list of Executive Committee members and Operating Agents.

  11. Monte Carlo simulation techniques for predicting annual power production

    International Nuclear Information System (INIS)

    Cross, J.P.; Bulandr, P.J.

    1991-01-01

    As the owner and operator of a number of small to mid-sized hydroelectric sites, STS HydroPower has been faced with the need to accurately predict anticipated hydroelectric revenues over a period of years. The typical approach to this problem has been to look at each site from a mathematical deterministic perspective and evaluate the annual production from historic streamflows. Average annual production is simply taken to be the area under the flow duration curve defined by the operating and design characteristics of the selected turbines. Minimum annual production is taken to be a historic dry year scenario and maximum production is viewed as power generated under the most ideal of conditions. Such an approach creates two problems. First, in viewing the characteristics of a single site, it does not take into account the probability of such an event occurring. Second, in viewing all sites in a single organization's portfolio together, it does not reflect the varying flow conditions at the different sites. This paper attempts to address the first of these two concerns, that being the creation of a simulation model utilizing the Monte Carlo method at a single site. The result of the analysis is a picture of the production at the site that is both a better representation of anticipated conditions and defined probabilistically

  12. 78 FR 26771 - Mesa Wind Power Corporation; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2013-05-08

    ... Wind Power Corporation's application for market-based rate authority, with an accompanying rate... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1346-000] Mesa Wind Power Corporation; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

  13. Merger market power analysis: Pacific Enterprises and Enova Corporation

    International Nuclear Information System (INIS)

    Bailey, S.

    1999-01-01

    The Pacific Enterprises - Enova (PE-Enova) merger may be viewed as an example of the new breed of gas and power 'convergence' mergers. The merger involved the combination of a large gas distribution utility and a contiguous gas and electric utility located in Southern California. As with most mergers, the PE-Enova merger was proposed to federal and state regulators as an opportunity to achieve ratepayer savings. However, the merger also presented an issue of vertical market power involving the substantial electric generation capacity served by Southern California Gas Company (SoCalGas) and its potential impact on electric market prices, and the associated revenues for generation assets owned by San Diego Gas and Electric (SDGandE). In order for the merger to proceed, the approval of at least five separate State and federal regulators would be required. Although much of the attention of state regulators, proponents, and intervenors surrounded the division of synergy savings between ratepayers and shareholders, the analysis of the potential for market power abuse was extensive. Intervenors presented numerous complex arguments regarding the potential adverse effects of the merger on competition. In particular, intervenors argued that the combined company would manipulate its storage and transport operations to influence the delivered price of gas to California generators, and therefore, the price of power in the wholesale electric market. The arguments surrounding the existence and impacts of market power in this case are of interest in the understanding the nature and complexity of factors that may be considered in evaluating mergers. The proceeding also provides insight into how regulators are grappling with market power issues associated with convergence mergers, and weigh merger costs and benefits

  14. China general nuclear power corporation--The recent research and application of the modular technology in nuclear power engineering

    International Nuclear Information System (INIS)

    Lu Qinwu

    2014-01-01

    Modular design and construction is one of the distinctive features of the 3"r"d generation nuclear power technology. In order to promote the technological innovations in nuclear power engineering design and construction and develop the self-owned modular technology, China General Nuclear Power Corporation (CGN) has carried out the R and D and application of the modular technology based on the CPR1000-type nuclear power plants, and has made the national-level achievements in the establishment of modular design technology system, development of 3D modular design system and application of modular construction of containment steel liner in the demonstration projects. (author)

  15. Hamilton Utilities Corporation annual report 2002 : people, performance, productivity : the business of public service

    International Nuclear Information System (INIS)

    2002-01-01

    A brief overview of the municipally-owned Hamilton Utilities Corporation was provided. When Ontario's electricity market opened to competition, it allowed wholesale and retail electricity marketers to operate on a competitive basis. This report describes how Hamilton Hydro, the largest subsidiary, successfully faced the challenges brought about by the open market. The strategy of growth as a multi-utility corporation progressed significantly. Major financial restructuring was completed, income level was maintained, as well as a strong balance sheet. The construction of Hamilton's first district energy system was effected by Hamilton Community Energy, another subsidiary. This project is expected to provide heat to 10 buildings in the downtown area, producing 3.5 megawatts of electricity for the City. The third subsidiary, FibreWired, applied its vast communications expertise to the health care sector. It offered Virtual Private Network (VPN) services to area hospitals and other health care providers in pharmaceutical and biotechnology. A major study was undertaken jointly with the City of Hamilton. It examined the feasibility of restructuring water and wastewater services into a municipally owned corporation under the umbrella of Hamilton Utilities Corporation. Various examples were provided throughout the report to better illustrate how corporate vision was translated into reality. tabs

  16. 2013 Annual Global Tax Competitiveness Ranking: Corporate Tax Policy at a Crossroads

    Directory of Open Access Journals (Sweden)

    Duanjie Chen

    2013-11-01

    Full Text Available Canada is losing its appeal as a destination for business investment. Its ability to compete against other countries for investment slipped considerably this year in our global tax competitiveness ranking, down six spots among OECD countries, and down 11 spots among the 90 countries. While many governments around the world responded to the fallout of the global recession by significantly reducing corporate tax rates, certain policy moves in Canada have us headed in the opposite direction. Canada is in danger of repelling business investment, which can only worsen current economic and fiscal challenges. Canada’s fading advantage is the result of recent anti-competitive provincial tax policies that increased the cost of investment. This includes, most notably, British Columbia’s decision to reverse the harmonization of its provincial sales tax with the federal GST, as well as recent corporate income tax rate hikes in B.C. and New Brunswick. When economic calamity strikes, and workers and their families feel the pain of lost jobs and lost wealth, politicians know they can score populist points by targeting the corporate sector. After all, corporations do not vote and they do not have a human face. News stories about major multinational corporations using tax-avoidance techniques to minimize their tax bills, only feed the populism, leaving voters believing that companies are getting away without paying a “fair share” of taxes. But when the corporate sector is targeted, it is not only supposedly wealthy capitalists who pay, but also employees, through lost wages and jobs, and working-class people who have a stake in companies through pension plans and mutual funds. On a larger scale, it is the economy that suffers. The same profit-maximizing imperative that leads companies to seek ways to reduce their tax liabilities also motivates firms to redirect investment to competing, lower-tax jurisdictions. Populist policies aimed at squeezing

  17. Investment recovery program at Niagara Mohawk Power Corporation

    International Nuclear Information System (INIS)

    Kotcamp, R.T.

    1993-01-01

    Niagara Mohawk Power Company's pioneering investment recovery program was initiated in 1984, Its mission is to dispose of company assets classified as obsolete, scrap, surplus, or retired capital equipment that results from company operations or work projects. These assets include items such as scrap wire, pipe, line hardware, transformers, power station equipment, crates of dusty telephone modems and computer monitors, pallets of residential gas and electric meters, a box of toilet paper holders, burned-out light bulbs, chunks of electric cable, brass and copper valves, electric bills from 1952, and a dozen tattered office chairs. It was risky for Niagara Mohawk to commit money to a program that created a scrap company inside a utility and is not the core business. No one regrets the decision to create and expand investment recovery. The program has contributed more than $35,000,000 ($8,140,585 nuclear division) of cash receipts with an additional $5,000,000 of cost avoidance since its inception. The program has credited these dollars back to the operating departments, which has reduced operating costs thereby improving the open-quotes bottom line.close quotes

  18. Robots in Power Reactor and Nuclear Fuel Development Corporation

    International Nuclear Information System (INIS)

    Koizumi, Masumichi

    1984-01-01

    The Power Reactor and Nuclear Fuel Development Corp. has carried out the technical development concerning ATRs and FBRs, nuclear fuel cycle, the uranium enrichment by centrifugal separation, the reprocessing of spent fuel, and the treatment and disposal of wastes. For the purpose, the Corp. has operated diversified nuclear facilities, and for the operational management of these nuclear facilities, aiming at the reduction of radiation exposure of workers, the shortening of working time, or the rise of the capacity ratio of the facilities, the technical development related to robots has been advanced. Namely, the equipment for the remote maintenace and repair of facilities, the equipment for checkup and monitoring and the equipment for test and inspection are the main subjects of robot development. Hereafter, it is necessary to develop the equipment to which the function of high grade is given and to automate main processes and checkup and monitoring system as well as to improve the reliability and endurance of facilities. The development of the manipulator system for remote maintenance, the facility of handling high radioactive substances and a master-slave manipulator, a power manipulator and a remote transfer equipment, the development of a remote repair and checkup equipment in the reprocessing plant, a remote maintenance and checkup equipment for FBRs and a remote automatic inspection equipment for ATRs are reported. (Kako, I.)

  19. Institute of Nuclear Power Operations annual report, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This annual report highlights the activities of the Institute of Nuclear Power Operations. The topics of the report include the president and chairmen's joint message, overview of programs serving as the foundation for most of its activities, performance indicators for the US nuclear utility industry, and INPO's 1993 financial reports and rosters. INPO has four technical cornerstone programs that serve as the foundation for most of its activities. (1) Evaluations of nuclear power plants operated by member utilities are conducted on a regularly scheduled basis. (2) INPO supports its member utilities in their work to achieve and maintain accreditation of training programs. (3) Events analysis programs identify and communicate lessons learned from plant events so utilities can take action to prevent similar events at their plants. (4) INPO helps members improve in nuclear operations areas through assistance programs and other activities that continually evolve to meet the changing needs of the nuclear industry

  20. Institute of Nuclear Power Operations 1994 annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This annual report highlights the activities of the Institute of Nuclear Power Operations. The topics of the report include the president and chairmen`s joint message, overview of programs serving as the foundation for most of its activities, performance indicators for the US nuclear utility industry, and INPO`s 1994 financial reports and rosters. INPO has four technical cornerstone programs that serve as the foundation for most of its activities. (1) Evaluations of nuclear power plants operated by member utilities are conducted on a regularly scheduled basis. (2) INPO supports its member utilities in their work to achieve and maintain accreditation of training programs. (3) Events analysis programs identify and communicate lessons learned from plant events so utilities can take action to prevent similar events at their plants. (4) INPO helps members improve in nuclear operations areas through assistance programs and other activities that continually evolve to meet the changing needs of the nuclear industry

  1. Institute of Nuclear Power Operations 1994 annual report

    International Nuclear Information System (INIS)

    1994-01-01

    This annual report highlights the activities of the Institute of Nuclear Power Operations. The topics of the report include the president and chairmen's joint message, overview of programs serving as the foundation for most of its activities, performance indicators for the US nuclear utility industry, and INPO's 1994 financial reports and rosters. INPO has four technical cornerstone programs that serve as the foundation for most of its activities. (1) Evaluations of nuclear power plants operated by member utilities are conducted on a regularly scheduled basis. (2) INPO supports its member utilities in their work to achieve and maintain accreditation of training programs. (3) Events analysis programs identify and communicate lessons learned from plant events so utilities can take action to prevent similar events at their plants. (4) INPO helps members improve in nuclear operations areas through assistance programs and other activities that continually evolve to meet the changing needs of the nuclear industry

  2. Does IFRS Detract from Social Disclosure in Corporate Annual Report and Accounts? Evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Arthur Joseph Avwokeni

    2016-10-01

    Full Text Available This study examines compliance with the corporate social disclosure requirement of the United Nations and whether their voluntary declaration by the International Accounting Standards Board detracts from compliance. Qualitative, financial and non-financial disclosures, based on core indicators developed by the United Nations Conference on Trade, Aid and Development, were garnered from financial statements prepared before and after IFRS adoption. Overall, corporate social disclosure on employment creation and labour practices; welfare, health and safety; and environment, improve during the IFRS regime. This improvement is associated with size of the firm, not audit identity, ownership or capital structure. This finding provides evidence to clinch anecdotal claims that even in the absence of laws some agents would still operate to meet the information needs of their principals; however, in line with organization theory, policies are needed to guide the actions of man, including the learning organization.

  3. 2014 annual site environmental report, Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-12-31

    Southwestern Power Administration’s Annual Site Environmental Report (ASER) serves as the chief reporting mechanism for site environmental performance information within the Department of Energy and as a valuable resource for shared and collaborative environmental protection and performance information to Agency stakeholders and members of the public living near Southwestern Power Administration’s (Southwestern) facilities and transmission line rights-of-ways. This ASER meets the requirements of Department of Energy (DOE) Order 231.B. Southwestern’s key environmental involvement includes an emphasis on the protection of ecological resources which is effectively accomplished through environmental program elements such as protecting water resources, generation of clean hydropower energy, oil spill prevention practices, elimination of green-house gas emissions, and comprehensive project reviews to ensure the protection of living organisms, migratory birds, Federally threatened or endangered species, and historic or cultural resources. Southwestern continues to actively minimize effects to natural resources and strive for continual improvement in the area of environmental compliance and sustainability while achieving the agency mission to market and deliver Federal hydroelectric power.

  4. Thermal and nuclear power generation cost estimates using corporate financial statements

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Nagatomi, Yu; Murakami, Tomoko

    2012-01-01

    There are two generally accepted methods for estimating power generation costs: so-called 'model plant' method and the method using corporate financial statements. The method using corporate financial statements, though under some constraints, can provide useful information for comparing thermal and nuclear power generation costs. This study used this method for estimating thermal and nuclear power generation costs in Japan for the past five years, finding that the nuclear power generation cost remained stable at around 7 yen per kilowatt-hour (kWh) while the thermal power generation cost moved within a wide range of 9 to 12 yen/kWh in line with wild fluctuations in primary energy prices. The cost of nuclear power generation is expected to increase due to the enhancement of safety measures and accident damage compensation in the future, while there are reactor decommissioning, backend and many other costs that the financial statement-using approach cannot accurately estimate. In the future, efforts should be continued to comprehensively and accurately estimate total costs. (author)

  5. Annual report 2003

    International Nuclear Information System (INIS)

    2003-01-01

    Delivering products and services to nuclear power plants operators, AREVA operates in every sector of the civilian nuclear power and fuel cycle industry. This annual report 2003 provides, in seven chapters, information on persons responsible for the annual report and for auditing the financial statements, general information on the company and share capital (statute, capital, share trading, dividends), information on company operations, changes and future prospects, assets, financial position and financial performance, corporate governance, recent developments and future prospects. (A.L.B.)

  6. CORPORATE FEED WITH DUAL SEGMENT CIRCULAR POLARIZED ARRAY RECTENNA FOR LOW POWER RF ENERGY HARVESTING

    Directory of Open Access Journals (Sweden)

    CHIA CHAO KANG

    2016-06-01

    Full Text Available This paper focuses on the investigation of the level powers that can be scavenged from the ambient environment by using corporate feed with dual segment circular polarized antenna array . It will converts the received power to direct current (DC. Being a circular polarized antenna, it has higher inductance per unit area, a good Q-factor and compact capability. The design of corporate-series feed rectenna array is to achieve a high gain antenna and maximize the RF energy received by the rectenna system at ultra low power levels. The entire structure was investigated using a combination of harmonic balance nonlinear analysis and full wave electromagnetic field analysis. The results show that 5.0 dBi gain for circular polarized antenna array can be achieved at frequency 956 MHz. When the input power of 20 dBm fed into the transmitting antenna, the maximum distance for radio frequency (RF harvesting is 5.32m. The output DC voltage for various values of incident RF power is also presented. There are noticed reasonable agreements between the simulated and measured result and the works concludes that the investigation of RF energy harvesting system was successful.

  7. Human Capital Development (HCD) through Open, Distance and E-Learning: Evidence from Corporate Annual Reports (CARs) of Top South African Listed Companies

    Science.gov (United States)

    Adelowotan, Mo

    2014-01-01

    This paper discusses the role of open, distance and e-learning in the development of human resources by examining human capital development related disclosures in the corporate annual reports (CARs) of top South African listed companies. The study employed content analysis method to analyse the CARs of these companies with the aid of qualitative…

  8. Design of a Corporate SDI in Power Sector Using a Formal Model

    Directory of Open Access Journals (Sweden)

    Italo L. Oliveira

    2017-10-01

    Full Text Available Geospatial data are essential for the decision-making process. However, obtaining and keeping such data up to date usually require much time and many financial resources. In order to minimize the production costs and incentivize sharing these data, countries are promoting the implementation of Spatial Data Infrastructures (SDI at the different public administration levels. The International Cartographic Association (ICA proposes a formal model that describes the main concepts of an SDI based on three of the five viewpoints of the Reference Model for Open Distributed Processing (RM-ODP. Afterwards, researchers extended ICA’s model to describe, more properly, the actors, hierarchical relationship and interactions related to the policies that drive an SDI. However, the proposed extensions are semantically inconsistent with the original proposal. Moreover, the use of ICA’s formal model and its extensions has not been assessed yet to specify a corporate-level SDI. This study describes the merger of actors and policies proposed by the ICA and its extensions in order to eliminate differences in the semantics or terminology among them. This unified model was applied to specify a corporate SDI for a large Brazilian corporation, the Minas Gerais Power Company (Companhia Energética de Minas Gerais (Cemig, which is comprised of about 200 companies in the power sector. The case study presents part of the specification of the five RM-ODP viewpoints, i.e., the three viewpoints featured in ICA’s formal model (Enterprise, Information, and Computation and the other two viewpoints that make up the RM-ODP (Engineering and Technology. The adapted ICA’s model proved adequate to describe SDI-Cemig. In addition, the case study may serve as an example of the specification and implementation of new SDIs, not only corporate ones, but also of public agencies at any hierarchical level.

  9. Churchill Falls (Labrador) Corporation Limited and Twin Falls Power Corporation Limited: Auditor's report and financial statements for the year ended December 31, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Churchill Falls (Labrador) Corp. Ltd. operates a hydroelectric generating plant and related transmission facilities in Labrador with a rated capacity of 5,428 MW. A power contract with Hydro-Quebec provides for the sale of substantially all of the energy from the plant until 2041. The corporation owns a 33.3% equity interest and a 66.7% voting interest in Twin Falls Power Corp., which has an inoperative 225 MW hydroelectric plant on the Unknown River in Labrador. Financial statements for the two corporations are presented for 1992. Total revenues from sales of power by Churchill Falls in 1992 were $87.4 million, and net income for the year was $26.3 million

  10. Revision of the second basic plans of power reactor development in Power Reactor and Nuclear Fuel Development Corporation

    International Nuclear Information System (INIS)

    1978-01-01

    Revision of the second basic plans concerning power reactor development in PNC (Power Reactor and Nuclear Fuel Development Corporation) is presented. (1) Fast breeder reactors: As for the experimental fast breeder reactor, after reaching the criticality, the power is raised to 50 MW thermal output within fiscal 1978. The prototype fast breeder reactor is intended for the electric output of 200 MW -- 300 MW, using mixed plutonium/uranium oxide fuel. Along the above lines, research and development will be carried out on reactor physics, sodium technology, machinery and parts, nuclear fuel, etc. (2) Advanced thermal reactor: The prototype advanced thermal reactor, with initial fuel primarily of slightly enriched uranium and heavy water moderation and boiling water cooling, of 165 MW electric output, is brought to its normal operation by the end of fiscal 1978. Along the above lines, research and development will be carried out on reactor physics, machinery and parts, nuclear fuel, etc. (Mori, K

  11. Trend of collective dose and dose reduction measures of Mitsubishi Electric Corporation workers in nuclear power plants

    International Nuclear Information System (INIS)

    Yamato, I.; Nakayama, T.; Shimokawa, F.; Yamamoto, T.

    1996-01-01

    MELCO has supplied the reactor instrumentation control system, reactor coolant pump motors, turbine generator and central control system for the pressurized water type nuclear power plant. For the legal periodical inspection and repair work, MELCO has also received orders for the periodical inspection for 23 power plants (including 4 plants under construction) of 5 electric power companies, and executed the inspection work from the view point of preventive maintenance. The annual dose for MELCO's workers is liable to be decreased in spite of increased number of plants. The dose for new plant in particular is 50, or less as compared with that for conventional plant. This is because the measures taken for the conventional plant against the dose reduction is reflected upon the new plant. The dose reduction measures are taken for each system for which order was received. Such measures are mainly intended to improve the work procedures and equipment for reduction of work time in the radioactive area and to arrange the working process, so as to perform the work in such period when the dose level at the working environment is low. To enhance the workers' consciousness for reduction of dose, MELCO provided the workers with dose predictive training, and let them aware of such items known at the tool box briefing (TBX), which could realize the dose reduction for workers. MELCO has been positively promoting the activity to arrange the desirable work environment for extermination of 3Ks (giken, gitsui, titanai) or 3Ds (dangerous, difficult, dirty) including protection against radiation in corporation with electric power companies. (author)

  12. CSR as Corporate Power. A Communication View Facebook Approach: An Exploratory Study

    Directory of Open Access Journals (Sweden)

    Anca Diana ȘERBAN

    2016-05-01

    Full Text Available This article aims to operationalize and measure the power of corporate communication and the main strategies that Romanian companies use to communicate their CSR campaigns on Facebook. The study conducts an extensive survey designed to emphasize the corporate communication indicators of power within CSR communication on Facebook and their correlation with the CSR communication strategy used by the first 100 biggest companies in Romania according to their turnover. The most important findings refer to the practice of Romanian companies of using their Facebook pages, primarily in order to expand their market, and less for reaching the confidence of their stakeholders. Thus, they profess their preference for visibility against trust. Romanian companies mainly use the self-centered strategy to communicate their CSR actions on Facebook, which means that the indicatives „relationship” and „co-creation” are very weak from the company’s point of view. The resistance to power is strong on the stakeholders’ side. As a result, it can be observed that there is a big pressure from the stakeholders’ point of view concerning the CSR communication on Facebook, in Romania. While companies try to sell their products or services through Facebook, stakeholders try to establish a relationship and consolidate a trust liaison with the companies they choose to buy from. In this context, it can be acknowledged that companies would rather respond to stakeholders’ questions or inquiries, than be proactive and anticipate some of their needs or complaints.

  13. British Columbia Power Export Corporation: Operational review for operating year, October 1989 to September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The British Columbia Power Export Corporation (POWEREX) is a wholly owned subsidiary of British Columbia Hydro, established in 1988 as the single agency responsible for implementing the provincial policy of international electricity trade. POWEREX objectives are to conduct long term firm electricity trade utilizing private sector financing, operating capabilities, and generating sources. Short term electricity transactions are handled by the part of POWEREX called the Powerex Pool Operation. An operational review of POWEREX for 1989-90 is presented, giving information on export contracts, license approvals, export sales negotiations, pool operation revenues and sales, British Columbia Hydro generation and integrated system performance, and operational planning. 15 figs

  14. Evaluation of foreign currency payment ability of China Nuclear Power Engineering Corporate

    International Nuclear Information System (INIS)

    Jiang Zhiqiong; Lu Gang; Zhang Qibo; Wen Suiru; Wu Weiwei

    2009-01-01

    Through this paper, after making a detailed research into the current foreign currency policy of China and the experience of China Nuclear Power Engineering Corporate(CNPEC) during LA2 project, the author evaluates the current ability of foreign currency settlement ability and defines the applicable process in CNPEC, in order to meet the future needs of CNPEC to make foreign currency payment for the multiple nuclear power projects. To ensure the foreign payment can be settled successfully, CNPEC should pay more attention to the import duty, foreign currency loan, clearing method, remittance after verification, as well as the financial risk management of foreign currency loan. On the premise that CNPEC can also get entitlement of import duty and value added tax preference, the author makes the point about how to enhance the capacity of foreign currency payment of CNPEC. (authors)

  15. Fortune 500 Corporate Headquarters

    Data.gov (United States)

    Department of Homeland Security — Large Corporate Headquarters in the United States This database is composed of 'an annual list of the 500 largest industrial corporations in the U.S., published by...

  16. 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Delivering products and services to nuclear power plants operators, AREVA operates in every sector of the civilian nuclear power and fuel cycle industry. This annual report 2002 provides information on financial highlights, corporate governance, organization of the Group, share, sustainable development policy (integration into the management practices, financial and environmental responsibility, responsibility to the employees and to the society), nuclear power (front end division, reactors and services division, back end division), connectors division, equity interests and financial report. (A.L.B.)

  17. Cost Analysis of an Air Brayton Receiver for a Solar Thermal Electric Power System in Selected Annual Production Volumes

    Science.gov (United States)

    1981-01-01

    Pioneer Engineering and Manufacturing Company estimated the cost of manufacturing and Air Brayton Receiver for a Solar Thermal Electric Power System as designed by the AiResearch Division of the Garrett Corporation. Production costs were estimated at annual volumes of 100; 1,000; 5,000; 10,000; 50,000; 100,000 and 1,000,000 units. These costs included direct labor, direct material and manufacturing burden. A make or buy analysis was made of each part of each volume. At high volumes special fabrication concepts were used to reduce operation cycle times. All costs were estimated at an assumed 100% plant capacity. Economic feasibility determined the level of production at which special concepts were to be introduced. Estimated costs were based on the economics of the last half of 1980. Tooling and capital equipment costs were estimated for ach volume. Infrastructure and personnel requirements were also estimated.

  18. Determining The Optimal Mix of Institutional Geopolitical Power And ASEAN Corporate Governance on the Firm Value of Malaysia’s Multinational Corporations (MNCs

    Directory of Open Access Journals (Sweden)

    Wan Sallha Yusoff

    2018-01-01

    Full Text Available The purpose of this paper is to examine the relationship between institutional geopolitics, ASEAN corporate governance quality and the firm value of Malaysia’s multinational corporation (MNC. We used the data of MNCs in Malaysia that were active from 2009 to 2013 as an evidence of MNCs from emerging market economies. Descriptive analysis, factor analysis and panel data analysis have been utilized to test the equation model. We also propose optimization analysis by using differential evolution method to capture the optimal mix of institutional geopolitics and ASEAN_CG on the firm value of MNC. Results reveal that the geopolitics of G7(Canada, France, German, Italy, Japan, Europe, and the United States, BRICS (Brazil, Russia, India, China, and South Africa, and ASEAN (Brunei Darussalam, Cambodia, Indonesia, Lao PDR, Myanmar, Philippines, Singapore, Thailand, Vietnam, and Malaysia are highly correlated with the firm value of Malaysia’s MNC. The power of institutional geopolitics, namely, military, material, and social power, influences firm value negatively and ASEAN_CG moderate the negative influence of institutional geopolitics on the firm value of MNC. Thus, it is importance for corporate management to understand the geopolitical changes of host countries’ and increase the compliance of ASEAN_CG in formulating their market value and segmentation strategies.

  19. Development of molten carbonate fuel cell technology at M-C Power Corporation

    Energy Technology Data Exchange (ETDEWEB)

    Dilger, D. [M-C Power Corp., Burr Ridge, IL (United States)

    1996-04-01

    M-C Power Corporation was founded in 1987 with the mission to further develop and subsequently commercialize molten carbonate fuel cells (MCFC). The technology chosen for commercialization was initially developed by the Institute of Gas technology (IGT). At the center of this MCFC technology is the Internally Manifolded Heat EXchange (IMHEX) separator plate design. The IMHEX technology design provides several functions within one component assembly. These functions include integrating the gas manifold structure into the fuel cell stack, separating the fuel gas stream from the oxidant gas stream, providing the required electrical contact between cells to achieve desired power output, and removing excess heat generated in the electrochemical process. Development of this MCFC technology from lab-scale sizes too a commercial area size of 1m{sup 2} has focused our efforts an demonstrating feasibility and evolutionary progress. The development effort will culminate in a proof-of-concept- 250kW power plant demonstration in 1996. The remainder of our commercialization program focuses upon lowering the costs associated with the MCFC power plant system in low production volumes.

  20. Advanced Power Electronics and Electric Motors Annual Report -- 2013

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, S. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bennion, K. [National Renewable Energy Lab. (NREL), Golden, CO (United States); DeVoto, D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Moreno, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Rugh, J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Waye, S. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-01-01

    This report describes the research into advanced liquid cooling, integrated power module cooling, high temperature air cooled power electronics, two-phase cooling for power electronics, and electric motor thermal management by NREL's Power Electronics group in FY13.

  1. Siemens Nuclear Power Corporation methods development for BWR/PWR reactor licensing

    International Nuclear Information System (INIS)

    Pruitt, D.W.

    1992-01-01

    This presentation addresses the Siemens Nuclear Power Corporation (SNP) perspective on the primary forces driving methods development in the nuclear industry. These forces are fuel design, computational environment and industry requirement evolution. The first segment of the discussion presents the SNP experience base. SNP develops, manufactures and licenses both BWR and PWR reload fuel. A review of this experience base highlights the accelerating rate at which new fuel designs are being introduced into the nuclear industry. The application of advanced BWR lattice geometries provides an example of fuel design trends. The second aspect of the presentation is the rapid evolution of the computing environment. The final subject in the presentation is the impact of industry requirements on code or methods development

  2. Wind Turbine Generator Efficiency Based on Powertrain Combination and Annual Power Generation Prediction

    Directory of Open Access Journals (Sweden)

    Dongmyung Kim

    2018-05-01

    Full Text Available Wind turbine generators are eco-friendly generators that produce electric energy using wind energy. In this study, wind turbine generator efficiency is examined using a powertrain combination and annual power generation prediction, by employing an analysis model. Performance testing was conducted in order to analyze the efficiency of a hydraulic pump and a motor, which are key components, and so as to verify the analysis model. The annual wind speed occurrence frequency for the expected installation areas was used to predict the annual power generation of the wind turbine generators. It was found that the parallel combination of the induction motors exhibited a higher efficiency when the wind speed was low and the serial combination showed higher efficiency when wind speed was high. The results of predicting the annual power generation considering the regional characteristics showed that the power generation was the highest when the hydraulic motors were designed in parallel and the induction motors were designed in series.

  3. Estimation of average annual streamflows and power potentials for Alaska and Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Verdin, Kristine L. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab. (INEEL)

    2004-05-01

    This paper describes the work done to develop average annual streamflow estimates and power potential for the states of Alaska and Hawaii. The Elevation Derivatives for National Applications (EDNA) database was used, along with climatic datasets, to develop flow and power estimates for every stream reach in the EDNA database. Estimates of average annual streamflows were derived using state-specific regression equations, which were functions of average annual precipitation, precipitation intensity, drainage area, and other elevation-derived parameters. Power potential was calculated through the use of the average annual streamflow and the hydraulic head of each reach, which is calculated from the EDNA digital elevation model. In all, estimates of streamflow and power potential were calculated for over 170,000 stream segments in the Alaskan and Hawaiian datasets.

  4. Annual report 2007 - CPFL Energy - Light and Power Company from Sao Paulo, SP, Brazil

    International Nuclear Information System (INIS)

    2008-01-01

    This document presents the balance of the economic, social, environmental performance of the Sao Paulo Light and Power Company (CPFL), during the year of 2007 as follows: highlights of 2007; profile of the CPFL Energy group; corporative performance; strategy of the company; performance in 2007 (the best year of the company); social responsibility

  5. Cost estimation of thermal and nuclear power using annual securities report

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Nagatomi, Yu; Murakami, Tomoko

    2011-01-01

    Cost estimation of generation cost derived from various power sources was widely conducted using model plant or annual securities report of electric utilities. Although annual securities report method was subjected to some limitation in methodology itself, useful information was obtained for cost comparison of thermal and nuclear power. Studies on generation cost evaluation of thermal and nuclear power based on this method during past five years showed that nuclear power cost was almost stable 7 Yen/kWh and thermal power cost was varying 9 - 12 Yen/kWh dependent on violent fluctuations of primary energy cost. Nuclear power was expected cost increase due to enhanced safety requirements or damage compensation of accidents as well as decommissioning and back-end cost, which were difficult to evaluate accurately with annual securities report. Further comprehensive and accurate cost estimation should be encouraged including these items. (T. Tanaka)

  6. A corporate social responsibility initiative in the field of nuclear power

    International Nuclear Information System (INIS)

    Stiopol, M.; Rizea, L.

    2009-01-01

    Societatea Nationala Nuclearelectrica SA is the operator of the Cernavoda nuclear power plant and the second largest energy producer in Romania, after Hidroelectrica, ensuring 18% of the internal energy demand. The production of nuclear power differs from other industrial activities through the risks it involves and through the legacy it leaves to the future generations, i.e. the nuclear waste. Taking into account these considerations, public acceptance represents a constant preoccupation for nuclear companies around the world. Corporate Social Responsibility (CSR) is a new practice in the nuclear industry. After a long tradition of involvement in the life of the local community through the Social Program for Cernavoda, Nuclearelectrica has initiated a CSR campaign with the theme 'Welcome a tree in your family', addressed to pupils and high school students from Cernavoda. By this campaign, we aimed at creating relevance, not just green lots and to launch a chain of reactions among the citizens of Cernavoda through 'word of mouth communication' so that our initiative may become a sustainable activity. In order to establish the basis of a long term program, the essential element was to change the attitude and behavior of the target population from lack of involvement to responsibility towards the environment. The ecological campaign developed in two phases of planting trees, has recorded significant results among the target population increasing the level of information and acceptance towards nuclear power. (authors)

  7. Annual report on nuclear power station operational management, 1984

    International Nuclear Information System (INIS)

    1985-09-01

    As of the end of fiscal year 1984, 28 nuclear power plants were in operation in Japan, the total power output of which was 20.56 million kW, equivalent to 22.9 % of the total generated electric power in Japan. Now nuclear power generation bears a very important role in the stable supply and cost stabilization of electric power. The result of the capacity factor in fiscal year 1984 was 73.9 %, which showed that the nuclear power generation and safety management technologies in Japan are at the top level in the world. However, in order that nuclear power generation accomplishes the role as main power source sufficiently hereafter by increasing the number of plants, the reliability and economical efficiency must be further improved, and especially the safety management and operational management become important. For the purpose, the operational experience accumulated so far must be effectively utilized. In this book, the outline of the administration on the safety regulation of nuclear power generation, the state of operation of nuclear power plants, the state of accidents and failures, the state of regular inspections and so on are summarized. Also the state of radioactive waste management and the radiation control for workers are reported. (Kako, I.)

  8. Radioactive materials released from nuclear power plants: Annual report, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Tichler, J.; Norden, K.; Congemi, J.

    1987-08-01

    Releases of radioactive materials in airborne and liquid effluents from commercial light water reactors during 1984 have been compiled and reported. Data on solid waste shipments as well as selected operating information have been included. This report supplements earlier annual reports issued by the former Atomic Energy Commission and the Nuclear Regulatory Commission. The 1984 release data are summarized in tabular form. Data covering specific radionuclides are summarized.

  9. Radioactive materials released from nuclear power plants. Annual report 1977

    International Nuclear Information System (INIS)

    Decker, T.R.

    1978-11-01

    Releases of radioactive materials in airborne and liquid effluents from commercial light water reactors during 1977 have been compiled and reported. Data on solid waste shipments as well as selected operating information have been included. This report supplements earlier annual reports issued by the former Atomic Energy Commission and the Nuclear Regulatory Commission. The 1977 release data are compared with previous years releases in tabular form. Data covering specific radionuclides are summarized

  10. Environmental Disclosure of Electric Power Companies Listed in the Corporate Sustainability Index (CSI

    Directory of Open Access Journals (Sweden)

    Clésia Ana Gubiani

    2012-12-01

    Full Text Available The study aimed to verify the level of disclosure of environmental information in the administration reports of the energy companies listed in the Corporate Sustainability Index (CSI. A descriptive and quantitative research was done, using the content analysis technique on the administration reports from 2006 to 2008. The sample consisted of 11 electric power companies listed in the CSI. For quantitative analysis of the disclosure index, the data collection instrument was based on the study of Rover, Murcia and Borba (2008, which proposes eight environmental categories and 36 subcategories. For the whole analysis of the data were elaborated networks of the items disclosed in each company, using the software UNICET ®. The survey results showed that there is satisfactory disclosure in the categories of environmental policies and education, training and research environment. However, it was found that there is need for greater disclosure of categories of products impacts and processes in the environment, power polices and financial environmental information. It was concluded that the information disclosed in the administration reports of the companies surveyed about the environmental information do not respect the principle of full disclosure.

  11. Vermont Yankee Nuclear Power Station. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 3,560,206 MWh(e) with the reactor on line 7,689 hrs. Information is presented concerning operations power generation, shutdowns, corrective maintenance, primary coolant chemistry, occupational radiation exposure, reportable occurrences, core spray welds inspection, loss of start-up transformer, and union strike

  12. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,587,248 MWH(e) with the reactor on line 6,242.4 hr. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  13. EDF Group - Annual Report 2014. The people who power tomorrow

    International Nuclear Information System (INIS)

    2015-01-01

    The EDF Group is the world's leading electricity company and very well established in Europe. Its business covers all electricity-related activities, from generation to networks and commerce. It is an important player in energy trading through EDF trading. This document is EDF Group's annual report for the year 2014. It contains information about Group profile, governance, business, development strategy, sales and marketing, positions in Europe and international activities. The document is made of several reports: the Activity and Sustainable Development Report, the 'EDF at a glance' report, and the EDF Group Performance sheet

  14. Superconductivity Program for electric power systems: 1994 annual PEER review. Volume 1, Meeting proceedings

    International Nuclear Information System (INIS)

    1994-01-01

    This is Volume I of information presented at the Annual Peer Review of the Superconductivity Program For Electric Power Systems. Topics include: Wire development; powder synthesis; characterization of superconducting materials; electric power applications; magnetic refrigerators; and motor cooling issues. Individual reports were processed separately for the database

  15. Lippe-Ems GmbH nuclear power stations. Annual report 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The Nuclear power company Lippe-Ems GmbH (KLE) runs the Emsland Nuclear Power Station (KKE) in Lingen (Ems) with a 1300 MW pressurized Water reactor. Partners of KLE are VEW and Elektromark. This 1992 annual report reveals numerous financial data of the operator (balance sheet, profit and loss account.) (orig./UA) [de

  16. Statistical annual report 2003 of Furnas - Electrical Power plants and Co., RJ, Brazil. Calendar year 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document presents the statistical annual report of Furnas Power Plants and Co, reporting the results obtained during the calendar year of 2003 and the evolution in the last five years, allowing a general and comparative views of the company performance focusing the power generation and transmission, economic and financial results

  17. Flexible mechanisms in the corporate greenhouse: implementation of the Kyoto Protocol and the globalization of the electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    Schreuder, Y.; Sherry, C. [University of Delaware, Newark, DE (United States). Center for Energy and Environmental Policy

    2001-07-01

    The contradictions and unresolved tensions between economic globalization and climate change negotiations have added urgency to the climate change debate. The paper argues that the declining role of the nation state in the global economy and the increasing reach of transnational corporations throughout the world present a serious challenge to the environmental integrity and success of international environmental treaties such as the Kyoto Protocol. In particular efficacy and equity of the flexible mechanism under the Kyoto Protocol are questioned as illustrated by the patterns of Foreign Direct Investment (FDI) of the US electric power industry in the developing world. US FDI in the electric power sectors of developing countries supports continued carbon-intensive development patterns which will make the long-term goals of the Kyoto Protocol more difficult to achieve. Consequently, FDI raises questions about justifiability of giving credit to Annex I countries through CDM projects undertaken by transnational electric power corporations. 13 refs.

  18. James Bay Development Corporation annual report, 1986. Societe de Developpement de la Baie James et entites affiliees rapport annuel, 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The James Bay Development Corporation is a paragovernmental body whose objective is to promote the development and exploitation of those natural resources, other than hydroelectric, which are found in the James Bay region of Quebec. It also oversees the administration and infrastructure management in the territory. This report reviews the year's activities of the Corporation and its affiliates involved in tourism, native development, mining, and municipal affairs. Most of the report consists of financial statements.

  19. Applications of magnetic power production and its assessment - Annual report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Kitanovski, A.; Vuarnoz, D.; Diebold, M.; Gonin, C.; Egolf, P. W.

    2007-07-01

    This annual report for the Swiss Federal Office of Energy (SFOE) takes a look at the work done at the University of Applied Sciences of Western Switzerland in 2007 on a project involving power production based on magnetic effects. In this annual report, a selection of feasible and economic magnetic power conversion systems is listed. Magnetic 'power generators' based on permanent and superconducting magnets are analysed for several heat source temperatures, magnetic field strengths and machine rotational frequencies. The analysis uses a newly derived model, which permits the determination of thermodynamic efficiency and exergy efficiency of a magnetic power-conversion system. This study shows that magnetic power conversion is better than conventional technologies in many aspects, such as, for example, for low exergy heat sources, where most of the conventional energy conversion technologies cannot even operate. The authors state that, in contrast, magnetic power generation technology leads to a high exergy efficiency of energy conversion for such sources.

  20. Power Electronics Thermal Management R&D: Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, Gilbert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-04-08

    The objective for this project is to develop thermal management strategies to enable efficient and high-temperature wide-bandgap (WBG)-based power electronic systems (e.g., emerging inverter and DC-DC converter). Device- and system-level thermal analyses are conducted to determine the thermal limitations of current automotive power modules under elevated device temperature conditions. Additionally, novel cooling concepts and material selection will be evaluated to enable high-temperature silicon and WBG devices in power electronics components. WBG devices (silicon carbide [SiC], gallium nitride [GaN]) promise to increase efficiency, but will be driven as hard as possible. This creates challenges for thermal management and reliability.

  1. HUMAN CAPITAL DEVELOPMENT (HCD THROUGH OPEN, DISTANCE AND E-LEARNING: Evidence From Corporate Annual Reports (Carsof Top South African Listed Companies

    Directory of Open Access Journals (Sweden)

    MO Olajide ADELOWOTAN

    2014-07-01

    Full Text Available This paper discusses the role of open, distance and e-learning in the development of human resources by examining human capital development related disclosures in the corporate annual reports (CARs of top South African listed companies. The study employed content analysis method to analyse the CARs of these companies with the aid of qualitative analysis software known as Atlasti. The results show that open, distance and e-learning plays a significant role in the development of human capital in the new economy organisations.

  2. Getting to yes: corporate power and the creation of a psychopharmaceutical blockbuster.

    Science.gov (United States)

    Applbaum, Kalman

    2009-06-01

    In this paper, I analyze documentary evidence from a pharmaceutical company's strategic marketing campaign to expand the sale of an antipsychotic medication beyond its conventional market. I focus on the role of the managerial function known as channel marketing, the task of which is to minimize friction, achieve coordination and add value in the distribution of the company's products. However, the path to achieving these objectives is challenged because members of the marketing channel, or intermediaries, may not be contractual members of the channel; in fact they may have widely divergent goals or may even be hostile to the manufacturer's efforts at control. This can be construed to be the case for physicians and others who are in the pharmaceutical manufacturer's distribution channel but not of it. Their views and actions must somehow be brought into alignment with the manufacturer's goals. This paper seeks to show part of the process from the manufacturer's strategic standpoint, in which potential dissenters are incorporated into the pharmaceutical company distribution channel. The routinization of this incorporation results in the diminishment of psychiatry's professional autonomy by means of what is-paradoxically to them, but not to a student of marketing-a competitive threat. The paper concludes with a discussion of corporate power.

  3. FY2009 Annual Progress Report for Advanced Power Electronics

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Susan A. [Dept. of Energy (DOE), Washington DC (United States)

    2010-01-01

    The Advanced Power Electronics and Electric Machines (APEEM) subprogram within the Vehicle Technologies Program provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on understanding and improving the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency.

  4. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electric power generated in 1975 was 1,074,401 MW(e) with the generator on line 4,680.7 hrs. Information is presented concerning operations, maintenance, radioactive effluents and waste shipments, health physics, shutdowns, and personnel exposures

  5. Radioactive Effluents from Nuclear Power Plants Annual Report 2007

    International Nuclear Information System (INIS)

    2010-01-01

    This report describes radioactive effluents from commercial nuclear power plants (NPPs) in the United States. This information was reported by the licensees for radioactive discharges that occurred in 2007. The report provides information relevant to the potential impact of NPPs on the environment and on public health.

  6. Radioactive Effluents from Nuclear Power Plants Annual Report 2008

    International Nuclear Information System (INIS)

    2010-01-01

    This report describes radioactive effluents from commercial nuclear power plants (NPPs) in the United States. This information was reported by the licensees for radioactive discharges that occurred in 2008. The report provides information relevant to the potential impact of NPPs on the environment and on public health.

  7. Policies for Enabling Corporate Sourcing of Renewable Energy Internationally: A 21st Century Power Partnership Report

    Energy Technology Data Exchange (ETDEWEB)

    Bird, Lori; Heeter, Jenny; O' Shaughnessy, Eric; Speer, Bethany; Volpi, Christina; Cook, Orrin; Jones, Todd; Taylor, Michael; Ralon, Pablo; Nilson, Emily

    2017-05-25

    This paper explores the policy and regulatory enabling environment for corporate sourcing of renewables. The paper has been developed in support of the Corporate Sourcing of Renewables Campaign, which was launched at the Clean Energy Ministerial (CEM) meeting in June 2016. Through the campaign, a subset of CEM member governments is collaborating with corporate and nongovernmental organization partners to facilitate increased corporate procurement of renewables and pursue supportive policies for corporate procurement. This paper finds that policy certainty is essential to creating vibrant markets for renewable energy. While policymakers may need to adjust policy mechanisms over time as markets go through different stages of maturity, they must also consider the economic decisions that end-users make in evaluating projects. Policy interaction is also important to consider because buyers seek assurances that their investments in renewables have impact and wish to make clear claims about their renewable energy purchases.

  8. Annual report 2006 - CPFL Energy - Light and Power Company from Sao Paulo, SP; Relatorio anual 2006 - CPFL Energia - Companhia Paulista de Forca e Luz

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This document reports the activities during 2006 of the Sao Paulo Light and Power (CPFL) as follows: society evolution, corporative and ethic management; economic and financial performance; operational performance, sustainability management and corporative responsibility.

  9. The current uranium exploration activities of the Power Reactor and Nuclear Fuel Development Corporation (PNC), Japan

    International Nuclear Information System (INIS)

    Miyada, H.

    2001-01-01

    As of November 1996, Japan's total installed commercial nuclear power generation capacity was 42 GW(e), accounting for 34% of total electric energy generation. By 2010, Japan intends to have an installed electricity generation capacity of 70.5 GW(e). This will increase the country's demand for nat Ural uranium from 7,700 t U in 1994 (13% of the world consumption) to 13,800 t U in 2010 (17%-19% of the world projected consumption). However, Japan's known uranium resources at Ningyo-Toge and Tono deposits, are estimated at roughly only 6,600 t U. The Long-term Programme for Research, Development and Utilization of Nuclear Energy (adopted in 1994) calls for diversification through long-term purchasing contracts, independent exploration and involvement in mining vent Ures, with the objective of ensuring independence and stability in Japan's development and utilization of nuclear energy. The Power Reactor and Nuclear Fuel Development Corporation (PNC) has been commissioned to carry out the task of independent exploration. PNC is carrying out exploration projects in Canada, Australia, USA and China targeting unconformity related type deposits with an eye to privatizing them. Currently about 40,000 t U of uranium resources are held by PNC. PNC has been carrying out the following related activities: (1) Reference surveys on uranium resources to delineate the promising areas; (2) Development of uranium exploration technology; (3) Information surveys on the nuclear industries to project long-term supply and demand; (4) International Cooperation programme on uranium exploration with Asian countries. (author)

  10. Power Electronics Thermal Management Research: Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, Gilberto [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-19

    The objective for this project is to develop thermal management strategies to enable efficient and high-temperature wide-bandgap (WBG)-based power electronic systems (e.g., emerging inverter and DC-DC converter). Reliable WBG devices are capable of operating at elevated temperatures (≥ 175 °Celsius). However, packaging WBG devices within an automotive inverter and operating them at higher junction temperatures will expose other system components (e.g., capacitors and electrical boards) to temperatures that may exceed their safe operating limits. This creates challenges for thermal management and reliability. In this project, system-level thermal analyses are conducted to determine the effect of elevated device temperatures on inverter components. Thermal modeling work is then conducted to evaluate various thermal management strategies that will enable the use of highly efficient WBG devices with automotive power electronic systems.

  11. Occupational exposures at nuclear power plants. Fourteenth annual report of the ISOE programme, 2004

    International Nuclear Information System (INIS)

    2006-01-01

    The ISOE Programme was created by the OECD Nuclear Energy Agency in 1992 to promote and co-ordinate international co-operative undertakings in the area of worker protection at nuclear power plants. The programme provides experts in occupational radiation protection with a forum for communication and exchange of experience. The ISOE databases enable the analysis of occupational exposure data from 478 operating and shutdown commercial nuclear power plants participating in the programme (representing some 90% of the world's total operating commercial reactors). The Fourteenth Annual Report of the ISOE Programme summarises achievements made during 2004 and compares annual occupational exposure data. Principal developments in ISOE participating countries are also described. (author)

  12. Occupational exposures at nuclear power plants. Eleventh annual report of the Isoe programme, 2001

    International Nuclear Information System (INIS)

    2002-01-01

    The ISOE Programme was created by the OECD Nuclear Energy Agency in 1992 to promote and co-ordinate international co-operative undertakings in the area of worker protection at nuclear power plants. The programme provides experts in occupational radiation protection with a forum for communication and exchange of experience. The ISOE databases enable the analysis of occupational exposure data from the 452 commercial nuclear power plants participating in the programme (representing some 90 per cent of the world's total operating commercial reactors). The Eleventh Annual Report of the ISOE Programme summarises achievements made during 2001 and compares annual occupational exposure data. Principal developments in ISOE participating countries are also described. (author)

  13. Seven Global Goals. 2013 annual report, Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    For over 70 years, Southwestern has marketed and delivered reliable, renewable, and affordable hydropower, partnering with Federal power stakeholders and others in the industry to make sure the lights stay on. This kind of effective, efficient, and cost conscious operation is made possible only by hard work and dedication. Southwestern employees work individually and as a team to meet seven comprehensive agency goals that touch on all aspects of the agency’s operations. Dubbed the “Seven Global Goals” by Administrator Chris Turner, these objectives identify specific, measurable targets that support Southwestern’s mission and reinforce its responsibilities toward its customers and the Nation.

  14. Woman power in Corporate India In conversation with Kiran Mazumdar Shaw, Chairperson & MD, Biocon ltd

    Directory of Open Access Journals (Sweden)

    Anitha Kurup

    2011-12-01

    Empirical evidence suggests that though women directors on Indian corporate boards show an increase both in numbers and in percentage terms, they are very much behind men. Women are also less well represented on Indian corporate boards as compared to other countries. Family ties, public sector employment and private sector banks are major sources of directorships for women. There are very few first generation women entrepreneurs in India. Though initial thresholds are higher for women to achieve success, the problems they face afterwards are similar to problems faced by successful men. India has a long way to go before women can catch up with men in the corporate world.

  15. Southwestern Power Administration annual site environmental report CY 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This report provides a synopsis of Southwestern Power Administration's (Southwestern's) effectiveness in managing its operations in an environmentally responsible manner. In CY 1997, the Office of Environmental, Safety, and Health was reorganized and incorporated into the Division of Acquisition and Property. The Division of Acquisition, Property, and Environmental Management maintains responsibility for development, oversight, and implementation of environmental programs. Senior Management at Southwestern has taken actions to increase environmental awareness throughout the organization. During CY 1997, (Southwestern) was not involved in any known programs or activities that had adverse impacts on the environment. The 1997 Environmental Appraisal, a portion of Southwestern's Self-Assessment and Appraisal Program, indicated approximately 90% compliance with Southwestern's written environmental programs. Southwestern continued to function throughout CY 1997 in an operations and maintenance posture with minor substation projects

  16. Thermal-Hydraulic Analysis of the Nuclear Power Engineering Corporation Containment Experiments with GOTHIC

    International Nuclear Information System (INIS)

    Wiles, Lawrence E.; George, Thomas L.

    2003-01-01

    GOTHIC version 7.0 was used to model five tests that were conducted in the Nuclear Power Engineering Corporation facility in Japan. The tests involved steam and helium injection into a preheated, spray-moderated, 1/4-scale model of a pressurized water reactor dry containment. Comparison of GOTHIC predictions to measured data for pressure, vapor temperatures, structure surface temperatures, and helium concentrations provided the opportunity to evaluate methods for modeling gas dispersion, drop heat and mass transfer, and surface heat transfer.The test facility includes three floors. The lower two floors are partitioned into a variety of rooms that simulate the lower regions of the modeled containment. On the upper floor, rooms that simulate the steam generator enclosures and the pressurizer enclosure extend into the dome, which represents about two-thirds of the total volume of the containment.The GOTHIC model was defined with 30 control volumes using a mix of lumped parameter volumes and subdivided volumes that employ a three-dimensional mesh. Each volume included several thermal conductors to model the various structures. More than 100 flow paths were used to model the hydraulic connections.Comparison of predictions to data showed that enhanced grid resolution in the vicinity of the steam-helium release point served to limit dispersion of the steam-helium plume. The data comparisons also suggested that spray effectiveness was reduced by drop impact with the containment wall and by the high drop concentration. The data comparisons further suggested that the presence of condensation, sprays, splashing, and other wetting mechanisms should be considered to obtain a reasonable estimate of the effect of liquid films on the structure surfaces

  17. Corporate brand positioning : searching for a new position - case Metso Power

    OpenAIRE

    KUURU, TIINA-KAISA

    2013-01-01

    Tutkielmasta TamPubissa rajattu versio. Täydellinen versio luettavissa Tampereen yliopiston Linna-kirjastossa. This is a limited version of the Master's thesis. The complete version can be viewed in print at Tampere University Library The purpose of this study is to describe and analyse the process of corporate brand positioning. Study is focused on B2B market, precisely on industrial brands. Corporate brand positioning is defined as a process of searching and finding a...

  18. The European Power and Gas Industry: the Market. Market Analysis - 2017-2020 Trends - Corporate Strategies

    International Nuclear Information System (INIS)

    2017-09-01

    This study presents: The medium-term and mega trends of the industry market developments and geographical segments; The competitive landscape and the main corporate rankings; The main conclusions of the report, summarised in 10 analytical slides. Content: 1. Market Fundamentals: Overview, The Industry; 2. Market Environment and Prospects: Market Environment, Demand and Supply, Prices, Trade; 3. Corporate Strategies and Competition: Competitive Environment, Structure of Competition, Business Strategies; 4. Case Studies; 5. Statistical Appendix; 6. Sources; 7. Annexes

  19. Power Pool of Alberta annual report 2000 : building a market

    International Nuclear Information System (INIS)

    2001-01-01

    As of January 1, 2001, deregulation of the electricity market in Alberta became a reality, and was accompanied by steady growth in demand for electricity combined with other factors that pushed the price of electricity upward. The Power Pool of Alberta ensures that market operations are open and fair. Its mandate, under the Electric Utilities Act, is the overall market surveillance in Alberta's electric industry. It is accomplished by working closely with industry and seeking feedback through four standing committees: Human Resources, Operations, Finance and Audit, and Balancing Pool. The goal for the coming years is to build confidence in the market, whereby consumers are confident about the fairness of the market price for electricity in Alberta, the choices available, and the continued reliability of the electric system in Alberta. The Energy Trading System was explained with information about system control and customer service, and details provided on the consultation and collaboration processes. The financial analysis of the year 2000 was provided, as well as a statement of operation, a balance sheet, and a statement of cash flows. tabs., figs

  20. Radioisotope space power generator. Annual report, October 1978-September 1979

    International Nuclear Information System (INIS)

    Elsner, N.B.; Chin, J.; Staley, H.G.; Bass, J.C.; Morris, C.C.; Shearer, C.H.; Steeger, E.J.

    1982-03-01

    The emphasis of the Isotec Technology Program shifted from development of a Galileo generator to study of a segmented selenide element and couple technology. The goal of the FY 79 program was to determine the feasibility of fabricating segmented selenide P and N elements which exploit the high thermoelectric efficiency of (Cu,Ag) 2 Se and Gd 2 Se 3 materials. A preliminary evaluation of segmented element efficiencies, material compatibilities, and fabrication abilities was used to select (Cu,Ag) 2 Se/Fe(Bi,Sb) 2 Te 3 for the P element and Gd 2 Se 3 /PbTe for the N element. The iron barrier between the (Cu,Ag) 2 Se and (Bi,Sb) 2 Te 3 prevented degradation of thermoelectric properties from copper contamination of the (Bi,Sb) 2 Te 3 . Fabrication processes for both elements were developed. Gd 2 Se 3 was friable and difficult to fabricate crack-free. It also exhibited a phase transition from cubic to orthorhombic, which increased its susceptibility to microcracking and reduced its thermoelectric efficiency. Life testing of an all-bonded couple with unsegmented (Cu,Ag) 2 Se P-type and Gd 2 Se 3 N-type elements was stopped after 3300 h in a nominal 830 0 C/390 0 C thermal gradient. The Gd 2 Se 3 leg did not show any significant degradation during the test. Examination of the hot end of the P element showed the need for a less reactive hot cap material and an improved vapor supression system. Module testing of a 1-W (Bi,Sb) 2 (Se,Te) 3 generator was performed for 5000 h with no degradation in power. High-temperature Thermid 600 adhesive curing cycles were examined, 75-mW module loading tests were performed, and diagnostic examination of RTG-2A and RTG-201 was completed

  1. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Bolinger, M.

    2007-05-01

    This report--the first in what is envisioned to be an ongoing annual series--attempts to fill this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2006.

  2. Annual report 2005

    International Nuclear Information System (INIS)

    2005-01-01

    Areva is a world energy expert on technological solutions for nuclear power generation and electricity transmission and distribution. This 2005 annual report provides information on the Group results in the following domains: information pertaining to the transaction, general information on the company and share capital, information on company operations, new developments and future prospects, assets, financial position, financial performance, corporate governance, recent developments and outlook. (A.L.B.)

  3. Annual report 2003; Rapport annuel 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    Delivering products and services to nuclear power plants operators, AREVA operates in every sector of the civilian nuclear power and fuel cycle industry. This annual report 2003 provides, in seven chapters, information on persons responsible for the annual report and for auditing the financial statements, general information on the company and share capital (statute, capital, share trading, dividends), information on company operations, changes and future prospects, assets, financial position and financial performance, corporate governance, recent developments and future prospects. (A.L.B.)

  4. Assessment of the Impacts of Green Mountain Power Corporation's Wind Power Facility on Breeding and Migrating Birds in Searsburg, Vermont: July 1996--July 1998

    Energy Technology Data Exchange (ETDEWEB)

    Kerlinger, P.

    2002-03-01

    A 6-megawatt, 11 turbine wind power development was constructed by Green Mountain Power Corporation in Searsburg, southern Vermont, in 1996. To determine whether birds were impacted, a series of modified BA (Before, After) studies was conducted before construction (1993-1996), during (1996), and after (1997) construction on the project site. The studies were designed to monitor changes in breeding bird community (species composition and abundance) on the site, examine the behavior and numbers of songbirds migrating at night over the site and hawks migrating over the site in daylight, and search for carcasses of birds that might have collided with the turbines.

  5. Hydro Ottawa Holding Inc. 2004 annual report : 3 ways to make 1 powerful connection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    An overview of the municipally owned Hydro Ottawa Holding Inc. was presented in this annual report. In 2004, the utility moved out of a deficit position for the first time in its 4 year history. Consolidated net earnings from continuing and discontinued operations increased to $19.7 million from $2.6 million. The increase was due mainly to decreases in operating, maintenance and administrative costs, as well as to the recovery of the cost of regulatory assets and the gain on the disposal of discontinued operations. As a result, the Corporation's deficit of $16.9 million became retained earnings of $2.8 million. Financial highlights were presented, as well as a comparison of distributors' charges with other utilities. It was noted that transparency and accountability were improved with more regular reporting to its shareholder, the City of Ottawa. In late 2004, City Council approved Hydro Ottawa Holding's 5 year consolidated financial plan which recommended that the City invest $37.8 million back into the Corporation and receive payment of the balance. The payback of the City's loan was financed through the Corporation's placement, in 2005, of $200 million in bonds. New programs included a trash-to-electricity contract, a bounty on energy-wasting fridges, and Telecom Ottawa's Data Backup and Recovery Service. Hydro Ottawa Holding Inc. is an amalgamation of 5 Ottawa-area utilities, and now provides leadership to 3 subsidiaries: Hydro Ottawa Ltd., Energy Ottawa Inc., and Telecom Ottawa Holding Inc.. Financial highlights of the 3 subsidiaries were also provided. tabs., figs.

  6. Hydro Ottawa Holding Inc. 2004 annual report : 3 ways to make 1 powerful connection

    International Nuclear Information System (INIS)

    2005-01-01

    An overview of the municipally owned Hydro Ottawa Holding Inc. was presented in this annual report. In 2004, the utility moved out of a deficit position for the first time in its 4 year history. Consolidated net earnings from continuing and discontinued operations increased to $19.7 million from $2.6 million. The increase was due mainly to decreases in operating, maintenance and administrative costs, as well as to the recovery of the cost of regulatory assets and the gain on the disposal of discontinued operations. As a result, the Corporation's deficit of $16.9 million became retained earnings of $2.8 million. Financial highlights were presented, as well as a comparison of distributors' charges with other utilities. It was noted that transparency and accountability were improved with more regular reporting to its shareholder, the City of Ottawa. In late 2004, City Council approved Hydro Ottawa Holding's 5 year consolidated financial plan which recommended that the City invest $37.8 million back into the Corporation and receive payment of the balance. The payback of the City's loan was financed through the Corporation's placement, in 2005, of $200 million in bonds. New programs included a trash-to-electricity contract, a bounty on energy-wasting fridges, and Telecom Ottawa's Data Backup and Recovery Service. Hydro Ottawa Holding Inc. is an amalgamation of 5 Ottawa-area utilities, and now provides leadership to 3 subsidiaries: Hydro Ottawa Ltd., Energy Ottawa Inc., and Telecom Ottawa Holding Inc.. Financial highlights of the 3 subsidiaries were also provided. tabs., figs

  7. Beaver Valley Power Station and Shippingport Atomic Power Station. 1977 annual environmental report: radiological. Volume 2

    International Nuclear Information System (INIS)

    1978-01-01

    The environmental monitoring conducted during 1977 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station is described. The environmental monitoring program consists of onsite sampling of water, gaseous, and air effluents, as well as offsite monitoring of water, air, river sediments, and radiation levels in the vicinity of the site. The report discusses releases of small quantities of radioactivity to the Ohio River from the Beaver Valley Power Station and Shippingport Atomic Power Station during 1977

  8. Economies of scale and scope in banking : Effects of government intervention, corporate strategy and market power

    NARCIS (Netherlands)

    Dijkstra, M.A.

    2017-01-01

    The financial crisis and ensuing policy responses have made the question of economies of scale and scope in the banking sector as topical as ever. This dissertation estimates economies of scale and scope in the banking sector and discusses the role of government intervention, corporate strategy and

  9. Controlled by the Corporate Narrative: Obama's Education Policy, the Shock Doctrine, and Mechanisms of Capitalist Power

    Science.gov (United States)

    Lea, Virginia

    2011-01-01

    This article aims to illuminate how and why public schools have been sustained and/or strengthened as hierarchical, inequitable, and undemocratic sites that serve the corporate capitalist state. In doing so, the author draws on three theoretical ideas: the "shock doctrine," described vividly by Naomi Klein (2007); "critical…

  10. Corporate Characteristics and Internal Control Information Disclosure- Evidence from Annual Reports in 2009 of Listed Companies in Shenzhen Stock Exchange

    Science.gov (United States)

    Xiaowen, Song

    Under the research framework of internal control disclosure and combined the current economic situation, the paper empirically analyzes the relationship between corporate characteristics and internal control information disclosure. The paper selects 647 A share companies listed in Shenzhen Stock Exchanges in 2009 as a sample. The results show: (1) the companies with excellent performance and high liquidity tend to disclose more internal control information; (2) the companies with the high leverage and also issued B shares are not willing to disclosure internal control information; (3) the companies sizes and companies which have hired Four-big accounting firms have no significant effects on internal control disclosure.

  11. 40 CFR 80.205 - How is the annual refinery or importer average and corporate pool average sulfur level determined?

    Science.gov (United States)

    2010-07-01

    ... volume of gasoline produced or imported in batch i. Si=The sulfur content of batch i determined under § 80.330. n=The number of batches of gasoline produced or imported during the averaging period. i=Individual batch of gasoline produced or imported during the averaging period. (b) All annual refinery or...

  12. 26 CFR 1.6038-1 - Information returns required of domestic corporations with respect to annual accounting periods...

    Science.gov (United States)

    2010-04-01

    ... the annual accounting period; (6) A list showing the name and address of, and the number of shares of... paragraphs (e) and (f) of this section shall be expressed in United States currency with a statement of the exchange rates used. (h) Time and place for filing return. Returns on Form 2952 required under paragraph (a...

  13. Occupational exposures at nuclear power plants. Twelfth annual report of the Isoe programme, 2002

    International Nuclear Information System (INIS)

    2004-01-01

    The Information System on Occupational Exposure (ISOE) was created by the OECD Nuclear Energy Agency in 1992 to promote and co-ordinate international co-operative undertakings in the area of worker protection at nuclear power plants. The ISOE Programme provides experts in occupational radiation protection with a forum for communication and exchange of experience. The ISOE databases enable the analysis of occupational exposure data from the 465 commercial nuclear power plants participating in the Programme (representing some 90 per cent of the world's total operating commercial reactors). The Twelfth Annual Report of the ISOE Programme summarises achievements made during 2002 and compares annual occupational exposure data. Principal developments in ISOE participating countries are also described. (author)

  14. POWER OF CORPORATE SOCIAL RESPONSIBILITY (CSR POTENTIAL FOR DEVELOPMENT IN BANDUNG BARAT REGENCY (POTENSI KEKUATAN CORPORATE SOCIAL RESPONSIBILITY (CSR BAGI PEMBANGUNAN DI KABUPATEN BANDUNG BARAT

    Directory of Open Access Journals (Sweden)

    Agus Rahmat

    2017-02-01

    Full Text Available Abstract. For Bandung Barat Regency (KBB, industries sector is the economy main pillar, shown by its contribution to regional income that reached 41.76%. This contribution is twice larg-er than the contribution of trading and agricultural sectors. The next issue is what should be done so that this power continues to develop and give benefits to the people of Bandung Barat Regency? This study was conducted to answer the proposed issues. Therefore, to obtain the data in order to answer the research problem, the method used is qualitative, with data collection techniques are interviews and literature reviews. Discussion of the data is done by comparison to the theories and concepts of Corporate Social Responsibility (CSR as well as what has been done by the govern-ment in some countries who are already doing CSR management. The results from this study showed that based on the geographical location of Bandung Barat Regency, the number and com-position and distribution of the population shows that Bandung Barat Regency has a high-potential districts to be a developed and prosperous regency. However, this potential has not well coordinated. One of the fundamental of this condition is that the Bandung Barat Regency govern-ment has not created the formulation and dissemination on what was to become the main focus for CSR activities of the companies in the region of Bandung Barat Regency. Abstrak. Sektor indutri merupakan penopang utama perkonomian di Bandung Barat (KBB, hal ini ditunjukan dengan kontribusinya yang mencapai 41,76 % . Kontribusi ini mencapai dua kali kontribusi sektor perdagangan maupun pertanian. Persoalan selanjutnya adalah apa yang harus dilakukan agar kekuatan ini tetap berkembang dan memberi kebaikan pada masyarakat disekitar (Kabupaten Bandung Barat ? Penelitian ini dilakukan guna menjawab persoalan yang diajukan. Oleh karena itu. Untuk memperoleh data guna menjawab permasalahan penelitian, maka metode yang digunakan adalah

  15. Annual report 2003 of Furnas - Electrical Power Plants and Co., RJ, Brazil

    International Nuclear Information System (INIS)

    2003-01-01

    This document presents the annual report of Furnas Power Plants and Co, highlighting the main enterprise achievements during the year of 2003, describing the company economic and financial important aspects and reporting the energy buying and sales, the infrastructure modernization, the activities of research and development, the social, cultural and environmental actions, the relationships with the company human resources. The report uses performance indexes for managerial description of the company activities

  16. Corporate against corporate management

    OpenAIRE

    Runcev, Nikolce; Krstev, Boris; Golomeova, Mirjana

    2010-01-01

    In contemporary economic performance, corporate governance is considered an essential prerequisite in building a successful system for creating an attractive investment climate, which is characterized by competing companies oriented and efficient financial markets. Good corporate governance is based on principles of transparency, bias, efficiency, timeliness, completeness and accuracy of information at all levels of management. Companies with good corporate governance and afford easier acc...

  17. Beaver Valley Power Station and Shippingport Atomic Power Station. 1984 Annual environmental report, radiological. Volume 2

    International Nuclear Information System (INIS)

    1985-01-01

    This report describes the Radiological Environmental Monitoring Program conducted during 1984 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station. The Radiological Environmental Program consists of on-site sampling of water and gaseous effluents and off-site monitoring of water, air, river sediments, soils, food pathway samples, and radiation levels in the vicinity of the site. This report discusses the results of this monitoring during 1984. The environmental program outlined in the Beaver Valley Power Station Technical Specifications was followed throughout 1984. The results of this environmental monitoring program show that Shippingport Atomic Power Station and Beaver Valley Power Station operations have not adversely affected the surrounding environment. 23 figs., 18 tabs

  18. Start. Slovak power stations, Nuclear Power Plants Mochovce (Annual report 1998)

    International Nuclear Information System (INIS)

    1999-01-01

    A brief account of activities carried out by the Nuclear power plants Mochovce in 1998 is presented. These activities are reported under the headings: (1) Director's foreword; (2) Power plant management; (3) Highlights of 1998; (4) Quality system; (5) Electricity and heat generation; Maintenance; Capital construction; (6) Radiation safety; Environmental impacts of operations; (7) List of balances; Human resources; (8) International co-operation; Public relations

  19. Corporate Responsibility

    DEFF Research Database (Denmark)

    Waddock, Sandra; Rasche, Andreas

    2015-01-01

    We define and discuss the concept of corporate responsibility. We suggest that corporate responsibility has some unique characteristics, which makes it different from earlier conceptions of corporate social responsibility. Our discussion further shows commonalities and differences between corporate...... responsibility and related concepts, such as corporate citizenship and business ethics. We also outline some ways in which corporations have implemented corporate responsibility in practice....

  20. Review of SaskPower`s Channel Lake experience : A report to the Crown Investments Corporation of Saskatchewan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-09

    A review was conducted by Crown Investments Corporation (CIC) of events surrounding the acquisition, management and the subsequent sale of SaskPower`s interest in Channel Lake Petroleum Ltd, a natural gas company, and a subsidiary of SaskPower from April 1993 until its sale to Direct Energy Marketing Ltd. in March 1997. Deloitte and Touche was hired by the CIC to assist in the review and to make recommendations. The firm conducted interviews with thirty individuals involved with the company over the course of its four-year ownership by SaskPower, focusing on arbitrage trading losses, the decision to liquidate the investment, the process of finding a buyer, the sale negotiations, the events surrounding the closing of the asset sale and the subsequent ratification of the final sale terms by the SaskPower Board of Directors. The review showed that overall, SaskPower and Channel Lake performed reasonably well throughout the four-year experience in terms of governance and management. However, instances of less than adequate performance, and in some cases serious errors in judgement were discovered. It was recommended that CIC review its guidelines and directives for effective governance and management of the entities under its jurisdiction, make revisions where necessary, facilitate a follow-up educational program and institute regular evaluations of Crown company performance based on clearly articulated standards.

  1. Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1995-05-01

    The Loviisa NPP units were in power operation the whole last quarter, with the exception of a reactor scram at Loviisa 1. The load factor average of all Finnish plant units was 100.2 %. The annual average was 90.0 %. All events in the fourth annual quarter were assigned level 0 (no safety significance) on the international INES scale. Four events in 1994 were classified level 1 (an anomaly). The Finnish Centre for Radiation and Nuclear Safety in December approved Imatran Voima Oy's application to extend the operation of the reactor pressure vessel of Loviisa 2 until the annual maintenance outage of 2010. During this quarter, a batch of spent fuel from Loviisa power plant was transported to Russia. Occupational doses and radioactive releases off-site were below authorised limits. Only such quantities of plant-based radioactive materials were measurable in samples collected around the plants as have no bearing on the radiation exposure of the population. The report includes a summary of all the items described in the Quarterly Reports of 1994. (8 figs., 4 tabs.)

  2. Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K [ed.

    1995-05-01

    The Loviisa NPP units were in power operation the whole last quarter, with the exception of a reactor scram at Loviisa 1. The load factor average of all Finnish plant units was 100.2 %. The annual average was 90.0 %. All events in the fourth annual quarter were assigned level 0 (no safety significance) on the international INES scale. Four events in 1994 were classified level 1 (an anomaly). The Finnish Centre for Radiation and Nuclear Safety in December approved Imatran Voima Oy`s application to extend the operation of the reactor pressure vessel of Loviisa 2 until the annual maintenance outage of 2010. During this quarter, a batch of spent fuel from Loviisa power plant was transported to Russia. Occupational doses and radioactive releases off-site were below authorised limits. Only such quantities of plant-based radioactive materials were measurable in samples collected around the plants as have no bearing on the radiation exposure of the population. The report includes a summary of all the items described in the Quarterly Reports of 1994. (8 figs., 4 tabs.).

  3. Social Corporate Responsibility regarding Household Consumer Satisfaction with the Electric Power Supply Services

    Directory of Open Access Journals (Sweden)

    Maria-Ana Georgescu

    2014-02-01

    Full Text Available The issue of the practical manifestation of corporate social responsibility towards consumers is highly important to the socio-economic reality in Romania. The present paper is the result of an investigation carried out in this field and it is distinguished by two aspects. The first aspect is its target audience used for research - household consumers of electricity, who can be called "vulnerable", captive consumers. The second aspect is the specificity of the electricity market. The aim of the research was to study the relationship between corporate social responsibility, instantiated by the quality of services provided by S.C. Electrica S.A. – Electrica Distribution and Supply South Transylvania and the consumers' loyalty towards the company, in case other electricity suppliers emerge. A subsidiary aspect was the generation of a database having an impact on customer retention. We have carried out some quantitative research, based on the survey method, having a sample of 521 household consumers from the Mures County. The study we carried out proves that consumer satisfaction, their degree of satisfaction under different aspects, is a way of gaining their trust on this particular market. Those consumers with a higher degree of trust in the company are more loyal. This will result in reducing migration to another electricity supplier, in the future, when all household consumers become eligible.

  4. DOE FreedomCAR and vehicle technologies program advanced power electronic and electrical machines annual review report

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, Mitch [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2006-10-11

    This report is a summary of the Review Panel at the FY06 DOE FreedomCAR and Vehicle Technologies (FCVT) Annual Review of Advanced Power Electronics and Electric Machine (APEEM) research activities held on August 15-17, 2006.

  5. Pluri-annual planning of power generation investments. 2005-2015 era

    International Nuclear Information System (INIS)

    2006-01-01

    The pluri-annual planning of power generation investments (PPI) is provided by article 6 of the law from February 10, 2000 relative to the modernization and development of the electric utility. The PPI is the concrete translation of the energy policy and aims to identify the necessary investments with respect to the security of power supplies and beyond the already known commitments. In the framework of market deregulation and respect of competition, the PPI is limited to the identification of such investments but not to their realization. This document, which corresponds to the 2005 exercise, is the second report to the Parliament. It stresses on the following points: the mastery of power demand and the demand scenarios, the level of accepted risk, the carrying out of the development of renewable energy sources (5 GW by 2010 and 12.5 GW by 2016 for wind power, and 6 TWh more for biomass by 2016), the start-up of an EPR reactor in 2012, the investment needs for classical thermal power plants (+2.6 GW of diesel fuel power plants and +500 MW of combustion turbines as decided by EdF), the development of production means in 2 regions with specific needs: Provence-Alpes-Cote d'Azur and Bretagne (Brittany), and also in insular areas (Corsica and overseas territories), and the reflexions to carry on in continuation of the PPI. (J.S.)

  6. 5. annual clean coal technology conference: powering the next millennium. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The Fifth Annual Clean Coal Technology Conference focuses on presenting strategies and approaches that will enable clean coal technologies to resolve the competing, interrelated demands for power, economic viability, and environmental constraints associated with the use of coal in the post-2000 era. The program addresses the dynamic changes that will result from utility competition and industry restructuring, and to the evolution of markets abroad. Current projections for electricity highlight the preferential role that electric power will have in accomplishing the long-range goals of most nations. Increase demands can be met by utilizing coal in technologies that achieve environmental goals while keeping the cost- per-unit of energy competitive. Results from projects in the DOE Clean Coal Technology Demonstration Program confirm that technology is the pathway to achieving these goals. The industry/government partnership, cemented over the past 10 years, is focused on moving the clean coal technologies into the domestic and international marketplaces. The Fifth Annual Clean Coal Technology Conference provides a forum to discuss these benchmark issues and the essential role and need for these technologies in the post-2000 era. This volume contains technical papers on: advanced coal process systems; advanced industrial systems; advanced cleanup systems; and advanced power generation systems. In addition, there are poster session abstracts. Selected papers from this proceedings have been processed for inclusion in the Energy Science and Technology database.

  7. The law for the Power Reactor and Nuclear Fule Development Corporation

    International Nuclear Information System (INIS)

    1977-01-01

    The Corporation is designated to engage in the independent development of fast breeder and advanced thermal reactors, the production, reprocessing and holding of nuclear fuel materials, and the exploration, mining and ore dressing of nuclear source materials to promoting the development and utilization of atomic energy. These activities are based on the Atomic Energy Basic Law, and limited to the peaceful uses. The basic concepts of a fast breeder reactor and an advanced thermal reactor are defined. A chapter is dedicated to the number, constitution, duties, competence, appointment and dismissal of the officers. The score of business is specified, beginning from the development and research of the reactors and ending with the import, export, purchase and selling of nuclear fuel materials and nuclear source materials. (Okada, K.)

  8. Tobacco talk: reflections on corporate power and the legal framing of consumption.

    Science.gov (United States)

    Benson, Peter

    2010-12-01

    This article examines how North Carolina tobacco farmers think about the moral ambiguities of tobacco business. Drawing on ethnographic research with tobacco farmers and archival research on the tobacco industry, I specify the core psychological defense mechanisms that tobacco companies have crafted for people associated with the industry. I also document local social, cultural, and economic factors in rural North Carolina that underpin ongoing rural dependence on tobacco despite the negativity that surrounds tobacco and structural adjustments. This article contributes to our knowledge about tobacco farmers and tobacco farming communities, which is important for tobacco-control strategies. I reflect on ethical and economic paradoxes related to the rise of corporate social responsibility in the tobacco industry, where an official legal framing of consumption, focused on informed adult consumer autonomy and health education, is promoted to undermine more robust public health prevention efforts.

  9. Slovak power stations, Nuclear power plants Jaslovske Bohunice. (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. These activities are reported under the headings: (1) Foreword by the director of Bohunice NPPs; (2) Management of Bohunice NPPs Subsidiary Plant; (3) The most significant events of the year 1997; (4) Electricity and heat production; (5) Safety; (6) Bohunice NPPs operation impact on environment; (7) The V-1 NPP and V-2 NPP upgrading; (8) Maintenance; (9) Capital construction; (10) Economic balance; (11) International co-operation; (12) Human sources; (12) Public relations

  10. Deregulation of the California electric power industry: An analysis of electric and natural gas corporate mergers and their effect on the California electric power market

    Science.gov (United States)

    Hornbuckle, James Dixon

    Deregulation of the electric utility industry in California is moving in a direction that places greater reliance on the market forces of competition. Investor owned utilities (IOU's) are using mergers and acquisitions to improve their ability to compete in this new environment. Two large mergers were proposed in 1996 that could affect the California market. The first is between Enron Corporation, a large power marketer and Portland General Corporation, owner of Portland General Electric. The second is between Pacific Enterprises Inc., owner of Southern California Gas Company, the largest natural gas utility in the U. S., and Enova Corporation, owner of San Diego Gas and Electric Company. Understanding the impact of these mergers on the California electric power market is the focus of this study. This study examines hypotheses dealing with: (1) Merger Strategy, (2) Efficiency, and (3) Market Power. Using the Miles and Snow (1978) typology, I develop a strategic orientation model for the merger participants and their competitors. The results suggest a two-stage strategic orientation: (1) regulated core business stage, where the firms follow a Defender strategy, and (2) unregulated business stage, where the firms follow a Prospector strategy. Further, the results show the mergers are consistent with the strategy of Enron and Pacific Enterprises. Event study methodology, dollar gains/losses and market value weighted returns are used to determine if the mergers support the efficiency hypothesis. The evidence suggests the mergers lead to increased competitive advantage through improved efficiency for the participants. The results also suggest the mergers do not harm the rivals. The results of structural changes made by the California Public Utilities Commission (CPUC) in deregulation of the California market and analysis of the mergers by the CPUC and the Public Utility Commission of Oregon suggest that the exercise of market power is not a significant issue. Finally

  11. Concerning results of environmental monitoring around the reprocessing facilities of Power Reactor and Nuclear Fuel Development Corporation

    International Nuclear Information System (INIS)

    1989-01-01

    The Central Evaluation Expert Group for Environmental radiation Monitoring has been engaged in examinations of plants for and results of the environmental radiation monitoring performed by Power Reactor and Nuclear Fuel Development Corporation around its reprocessing facilities. The present report outlines an examination of the results of monitoring carried out in 1987 (January to December). It is concluded that the methods used for the monitoring and its technical level are satisfactory in meeting the objectives of the monitoring plans. Expept for tritium in seawater, the level of radiations stays within the normal variation determined based on preliminary measurements of the background radiation. The procedure used for the calculation of exposure dose is also satisfactory in meeting the requirements specified in the monitoring plants. It is confirmed that the exposure dose of the residents around the facilities is well below the permissible exposure dose limite specified in law. (Nogami. K.)

  12. 75 FR 64303 - Vermont Marble Power, Division of Omya Inc.; Central Vermont Public Service Corporation; Notice...

    Science.gov (United States)

    2010-10-19

    ...-029; 2445-023; 2558-029] Vermont Marble Power, Division of Omya Inc.; Central Vermont Public Service... Soliciting Comments and Motions To Intervene October 12, 2010. On August 31, 2010, Vermont Marble Power... relicensing. Applicant Contacts: For transferor: Todd Allard, Operations Engineer Omya, Inc., Vermont Marble...

  13. Power Deals. Mergers and acquisitions activity within the global electricity and gas market. 2010 Annual Review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-02-15

    The global power deal market is finally seeing an upward trend in momentum from the lows reached in 2009, with the total deal value in the non-renewable electricity and gas sectors up 19% year on year from USD 97.6bn to USD 116bn in 2010 - a year which also saw an end to the deal stalemate in the US with a renewed deal flow that looks set to continue this year. Compared to the heady mountain of power deals transacted between 2005-2008, deal values remain low but conditions are in place for a return at least to the foothills of these peaks, according to PwC's annual Power Deals review. Globalisation of the power sector is moving forward on a number of fronts with, for example, companies looking at gaining a larger presence in growth markets, acquisitions of global network asset portfolios with strong international interest in infrastructure assets and signs of greater Chinese involvement, not just from grid companies but also independent power producers.

  14. Analysis and Evaluation of Operational Data 1991 annual report: Power reactors

    International Nuclear Information System (INIS)

    1992-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities performed during 1991. The report is published in two separate parts. This document, NUREG-1272, Vol. 6, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol. 6, No. 2, covers nonreactors and presents a review of the events and concerns during 1991 associated with the use of licensed material in nonreactor applications. Each volume contains a list of the AEOD reports issued for 1984 through 1991

  15. Office of Analysis and Evaluation of Operational Data 1989 annual report, Power reactors

    International Nuclear Information System (INIS)

    1990-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1989. The report is published in two separate parts. This document, NUREG-1272, Vol. 4, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. This report also compiles the status of staff actions resulting from previous Incident Investigation Team (IIT) reports. 16 figs., 9 tabs

  16. Model calculating annual mean atmospheric dispersion factor for coastal site of nuclear power plant

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    This paper describes an atmospheric dispersion field experiment performed on the coastal site of nuclear power plant in the east part of China during 1995 to 1996. The three-dimension joint frequency are obtained by hourly observation of wind and temperature on a 100m high tower; the frequency of the “event day of land and sea breezes” are given by observation of surface wind and land and sea breezes; the diffusion parameters are got from measurements of turbulent and wind tunnel simulation test.A new model calculating the annual mean atmospheric dispersion factor for coastal site of nuclear power plant is developed and established.This model considers not only the effect from mixing release and mixed layer but also the effect from the internal boundary layer and variation of diffusion parameters due to the distance from coast.The comparison between results obtained by the new model and current model shows that the ratio of annual mean atmospheric dispersion factor gained by the new model and the current one is about 2.0.

  17. Annual conference on nuclear technology. Nuclear power 2001: option for the future

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    The Dresden Palace for Culture was the venue of the ANNUAL MEETING ON NUCLEAR TECHNOLOGY on May 15-17, 2001, the first to be held in Dresden and the first also to be held in one of the new German federal states. Although no nuclear plant is in operation in East Germany after the Greifswald Nuclear Power Station was decommissioned, nuclear technology continues to play an important role especially in research and university teaching in this part of Germany. The organizers of the conference, Deutsches Atomforum e.V. (DAtF) and Kerntechnische Gesellschaft e.V. (KTG), welcomed more than 1000 participants from nineteen countries. The three-day program, with its traditional, proven structure, featured plenary sessions on the first day, and specialized sessions, technical sessions, poster sessions, and other events on the following days. The partner country at the Annual Meeting on Nuclear Technology was Russia, with a session specially devoted to selected topics of the country. The conference was accompanied by a technical exhibition with company meeting points of vendors, suppliers, and service industries. A video film forum was arranged for the interested public which featured contributions about nuclear research, nuclear power plant operation, transport and storage as well as decommissioning. Another major event was a workshop on 'Preserving Competence in Nuclear Technology'. The plenary day is described in this summary report, while the results of the technical sessions as seen by the rapporteurs are printed elsewhere in this issue of atw 8/9, 2001. (orig.) [de

  18. National Nuclear Corporation Limited report and financial statements 31 March 1986

    International Nuclear Information System (INIS)

    1986-01-01

    The paper contains the directors' annual report and the audited financial statements of the National Nuclear Corporation Limited, 1985/6. The company is engaged in designing and constructing power stations and nuclear power reactors, and other related work, and in associated research and development. (U.K.)

  19. National Nuclear Corporation Limited report and financial statements 31 March 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The paper contains the directors' annual report and the audited financial statements of the National Nuclear Corporation Limited, 1985/6. The company is engaged in designing and constructing power stations and nuclear power reactors, and other related work, and in associated research and development. (U.K.).

  20. Federally Chartered Corporation: Review of the Financial Statement Audit Report for the Naval Sea Cadet Corps for 1998 and 1997

    National Research Council Canada - National Science Library

    2000-01-01

    ... to: present the corporation's assets and liabilities and reasonable detail on the corporation's income and expenses in annual financial statements, obtain an annual financial audit by an independent...

  1. 18 CFR 382.201 - Annual charges under Parts II and III of the Federal Power Act and related statutes.

    Science.gov (United States)

    2010-04-01

    ... annual charges to be assessed to power marketing agencies. The adjusted costs of administration of the... Act and related statutes. (a) Determination of costs to be assessed to public utilities. The adjusted costs of administration of the electric regulatory program, excluding the costs of regulating the Power...

  2. BC Hydro - IPC review : report on the creation of IPC International Power Corporation and its joint venture with the British Columbia Hydro and Power Authority for the Raiwind power project

    International Nuclear Information System (INIS)

    1997-03-01

    BC Hydro is one of the sponsors involved in the construction of a thermal electric power plant in Raiwind, Pakistan. As a Crown corporation, BC Hydro and its participation in the project is subject to the policies and priorities of the provincial government. This document describes the circumstances surrounding the creation of the International Power Corporation (IPC) and its joint venture with BC Hydro for the development of international power projects including the Raiwind project. The project has provoked much public discussion in British Columbia because of the involvement of Cayman Island companies in the project structure. There is concern with the intermingling of public and private interests in the project, including allegations that an IPC share offering benefited insiders of government and BC Hydro. A description of the history and structure of the Raiwind project and detailed information on the British Columbia participants is provided. Directors and shareholders of the principal corporate participants are listed. The development process in Pakistan, the key features of the project and the underlying agreements among the participants are described. An assessment of potential conflicts of interest and a review of public sector standards and guidelines regarding conflicts of interest is presented. 60 refs., 39 tabs., 6 figs

  3. 5. annual clean coal technology conference: powering the next millennium. Vol.1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Fifth Annual Clean Coal Technology Conference focuses on presenting strategies and approaches that will enable clean coal technologies to resolve the competing, interrelated demands for power, economic viability, and environmental constraints associated with the use of coal in the post-2000 era. The program addresses the dynamic changes that will result from utility competition and industry restructuring, and to the evolution of markets abroad. Current projections for electricity highlight the preferential role that electric power will have in accomplishing the long-range goals of most nations. Increased demands can be met by utilizing coal in technologies that achieve environmental goals while keeping the cost- per-unit of energy competitive. Results from projects in the DOE Clean Coal technology Demonstration Program confirm that technology is the pathway to achieving these goals. The industry/government partnership, cemented over the past 10 years, is focused on moving the clean coal technologies into the domestic and international marketplaces. The Fifth Annual Clean Coal Technology Conference provides a forum to discuss these benchmark issues and the essential role and need for these technologies in the post-2000 era. This volume contains papers presented at the plenary session and panel sessions on; international markets for clean coal technologies (CCTs); role of CCTs in the evolving domestic electricity market; environmental issues affecting CCT deployment; and CCT deployment from today into the next millennium. In addition papers presented at the closing plenary session on powering the next millennium--CCT answers the challenge are included. Selected papers have been processed for inclusion in the Energy Science and Technology database.

  4. Conflict and Power Games in a Multinational Corporation : Sensegiving as a Strategy of Preservation

    NARCIS (Netherlands)

    Drori, Israel; Ellis, Shemuel

    In this paper, we seek to extend existing understandings of how sensegiving is associated with conflict and power games. We look specifically at sensegiving by managers that promotes strategies and actions geared toward preserving their positions against change. Formulating a conceptual framework

  5. Corporate contestability and corporate expropriation

    Directory of Open Access Journals (Sweden)

    Abdul Hadi Zulkafli

    2016-12-01

    Full Text Available This paper presents evidence on the role of ownership in dealing with corporate expropriation of listed companies in Malaysia. From the perspective of expropriation, a single controlling shareholder is always associated with such behavior due to their power and control at the expense of minority shareholder. However, subsequent individual or coalition of large shareholders can be an important corporate governance tool by providing effective monitoring that would lessen the possibility of expropriation by the controlling shareholder. Relating to that, this study evaluates the role of controlling and large shareholders in dealing with corporate expropriation. It is found that there is a negative relationship between single controlling shareholders and dividend payout ratio indicating that firms with only controlling shareholder will pay a lower dividend due to possible expropriation through profit diversion by controlling shareholder. Using Herfindahl Index as a proxy for ownership contestability, the presence of large shareholders along with controlling shareholder has a positive relationship with dividend payout implying that increased contestability helps to curb the power of controlling shareholder to expropriate fund for their own benefit. In accordance with agency theory, the outcome suggests that large shareholders play a monitoring role in minimizing the Type II agency problem. It is also verifying the argument made based on the Catering Theory of Dividend that the presence of large shareholder brings benefit to all shareholders as they are able to reduce profit diversion by demanding for higher dividend

  6. A corporate ALARA engineering support for all EDF nuclear power plan

    Energy Technology Data Exchange (ETDEWEB)

    Quiot, A.; Orjol, A. [Electricite de France (EDF/UTO), 93 - Noisy le Grand (France); Lafferriere, F.; Fraissinet, E. [Electricite de France (EDF-CNPE) du Blayais, 33 - Saint Ciers sur Gironde (France)

    2006-07-01

    Since 1991, EDF has established a national ALARA programme with a very effective result in terms of dose reduction. Of course, EDF management has decided to further improve occupational exposure management and dose reduction (both collective and individuals). Since 2002, one key element allowing reaching the new goals, is the set up of a national corporate engineering as a support for EDF sites for preparing maintenance interventions. Its objective is to reduce occupational exposure with the help of up to date tools and methods. That engineering support consists of a growing up team comprising at the moment about ten engineers, including CAD specialists and health physicists. It is in charge of using very efficient tools such as P.A.N.T.H.E.R. -R.P. to perform national modelling studies concerning the reactor and auxiliary buildings areas, which are the most costly in terms of doses. That tool has been developed initially for the first steam generator replacements by EDF S.E.P.T.E.N. engineering department. It uses friendly user 3D software to create a geometrical model of the concerned area with all existing materials (pipes, valves, concrete walls allowing visualizing on personal computers, each area from all perspectives. Other important inputs for P.A.N.T.H.E.R. R.P. are the quantities of radioisotopes present in each material. The code allows then estimating the dose rates at each location in the area, calculating the contribution of each equipment (i.e sources) in the area to the dose rate in each point; calculating also the contribution of each radio isotope to the dose rates. With the help of these models the engineering is then able to perform in depth generic work areas optimisation studies, taking into account the workload in each workstation. Up to recently these studies were performed only for huge operations such as steam generator replacements, they are now proposed to EDF sites for more usual interventions. The selection of these interventions takes

  7. A corporate ALARA engineering support for all EDF nuclear power plan

    International Nuclear Information System (INIS)

    Quiot, A.; Orjol, A.; Lafferriere, F.; Fraissinet, E.

    2006-01-01

    Since 1991, EDF has established a national ALARA programme with a very effective result in terms of dose reduction. Of course, EDF management has decided to further improve occupational exposure management and dose reduction (both collective and individuals). Since 2002, one key element allowing reaching the new goals, is the set up of a national corporate engineering as a support for EDF sites for preparing maintenance interventions. Its objective is to reduce occupational exposure with the help of up to date tools and methods. That engineering support consists of a growing up team comprising at the moment about ten engineers, including CAD specialists and health physicists. It is in charge of using very efficient tools such as P.A.N.T.H.E.R. -R.P. to perform national modelling studies concerning the reactor and auxiliary buildings areas, which are the most costly in terms of doses. That tool has been developed initially for the first steam generator replacements by EDF S.E.P.T.E.N. engineering department. It uses friendly user 3D software to create a geometrical model of the concerned area with all existing materials (pipes, valves, concrete walls allowing visualizing on personal computers, each area from all perspectives. Other important inputs for P.A.N.T.H.E.R. R.P. are the quantities of radioisotopes present in each material. The code allows then estimating the dose rates at each location in the area, calculating the contribution of each equipment (i.e sources) in the area to the dose rate in each point; calculating also the contribution of each radio isotope to the dose rates. With the help of these models the engineering is then able to perform in depth generic work areas optimisation studies, taking into account the workload in each workstation. Up to recently these studies were performed only for huge operations such as steam generator replacements, they are now proposed to EDF sites for more usual interventions. The selection of these interventions takes

  8. The Untapped Power of Soda Taxes: Incentivizing Consumers, Generating Revenue, and Altering Corporate Behavior.

    Science.gov (United States)

    Roache, Sarah A; Gostin, Lawrence O

    2017-06-14

    Globally, soda taxes are gaining momentum as powerful interventions to discourage sugar consumption and thereby reduce the growing burden of obesity and non-communicable diseases (NCDs). Evidence from early adopters including Mexico and Berkeley, California, confirms that soda taxes can disincentivize consumption through price increases and raise revenue to support government programs. The United Kingdom's new graduated levy on sweetened beverages is yielding yet another powerful impact: soda manufacturers are reformulating their beverages to significantly reduce the sugar content. Product reformulation - whether incentivized or mandatory - helps reduce overconsumption of sugars at the societal level, moving away from the long-standing notion of individual responsibility in favor of collective strategies to promote health. But as a matter of health equity, soda product reformulation should occur globally, especially in low- and middleincome countries (LMICs), which are increasingly targeted as emerging markets for soda and junk food and are disproportionately impacted by NCDs. As global momentum for sugar reduction increases, governments and public health advocates should harness the power of soda taxes to tackle the economic, social, and informational drivers of soda consumption, driving improvements in food environments and the public's health. © 2017 The Author(s); Published by Kerman University of Medical Sciences. This is an open-access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

  9. The Untapped Power of Soda Taxes: Incentivizing Consumers, Generating Revenue, and Altering Corporate Behavior

    Directory of Open Access Journals (Sweden)

    Sarah A. Roache

    2017-09-01

    Full Text Available Globally, soda taxes are gaining momentum as powerful interventions to discourage sugar consumption and thereby reduce the growing burden of obesity and non-communicable diseases (NCDs. Evidence from early adopters including Mexico and Berkeley, California, confirms that soda taxes can disincentivize consumption through price increases and raise revenue to support government programs. The United Kingdom’s new graduated levy on sweetened beverages is yielding yet another powerful impact: soda manufacturers are reformulating their beverages to significantly reduce the sugar content. Product reformulation – whether incentivized or mandatory – helps reduce overconsumption of sugars at the societal level, moving away from the long-standing notion of individual responsibility in favor of collective strategies to promote health. But as a matter of health equity, soda product reformulation should occur globally, especially in low- and middleincome countries (LMICs, which are increasingly targeted as emerging markets for soda and junk food and are disproportionately impacted by NCDs. As global momentum for sugar reduction increases, governments and public health advocates should harness the power of soda taxes to tackle the economic, social, and informational drivers of soda consumption, driving improvements in food environments and the public’s health.

  10. Concise Approach for Determining the Optimal Annual Capacity Shortage Percentage using Techno-Economic Feasibility Parameters of PV Power System

    Science.gov (United States)

    Alghoul, M. A.; Ali, Amer; Kannanaikal, F. V.; Amin, N.; Sopian, K.

    2017-11-01

    PV power systems have been commercially available and widely used for decades. The performance of a reliable PV system that fulfils the expectations requires correct input data and careful design. Inaccurate input data of the techno-economic feasibility would affect the size, cost aspects, stability and performance of PV power system on the long run. The annual capacity shortage is one of the main input data that should be selected with careful attention. The aim of this study is to reveal the effect of different annual capacity shortages on the techno-economic feasibility parameters and determining the optimal value for Baghdad city location using HOMER simulation tool. Six values of annual capacity shortage percentages (0%, 1%, 2%, 3%, 4%, and 5%), and wide daily load profile range (10 kWh - 100 kWh) are implemented. The optimal annual capacity shortage is the value that always "wins" when each techno-economic feasibility parameter is at its optimal/ reasonable criteria. The results showed that the optimal annual capacity shortage that reduces significantly the cost of PV power system while keeping the PV system with reasonable technical feasibility is 3%. This capacity shortage value can be carried as a reference value in future works for Baghdad city location. Using this approach of analysis at other locations, annual capacity shortage can be always offered as a reference value for those locations.

  11. Occupational radiation exposure at Commercial Nuclear Power reactors 1983. Volume 5. Annual report

    International Nuclear Information System (INIS)

    Brooks, B.G.

    1985-03-01

    This report presents an updated compilation of occupational radiation exposure at commercial nuclear power reactors for the years 1969 through 1983. The summary based on information received from the 75 light-water-cooled reactors (LWRs) and one high temperature gas-cooled reactor (HTGR). The total number of personnel monitored at LWRs in 1983 was 136,700. The number of workers that received measurable doses during 1983 and 85,600 which is about 1000 more than that found in 1982. The total collective dose at LWRs for 1983 is estimated to be 56,500 man-rems (man-cSv), which is about 4000 more man-rems (man-cSv) than that reported in 1982. This resulted in the average annual dose for each worker who received a measurable dose increasing slightly to 0.66 rems (cSv), and the average collective dose per reactor increasing by about 50 man-rems (man-cSv), and the average collective dose per reactor increasing by about 50 man-rems (man-cSv) to a value of 753 man-rems (man-cSv). The collective dose per megawatt of electricity generated by each reactor also increased slightly to an average value of 1.7 man-rems (man-cSv) per megawatt-year. Health implications of these annual occupational doses are discussed

  12. Rand Corporation

    Science.gov (United States)

    ... Jobs at RAND Media Resources Congressional Resources Doing Business with RAND Supporting RAND Educational Opportunities Alumni Association Follow RAND Corporation on Facebook RAND Corporation on Twitter RAND Corporation on LinkedIn ...

  13. Power Deals. Mergers and acquisitions activity within the global electricity and gas market. 2006 Annual Review

    International Nuclear Information System (INIS)

    2007-01-01

    2006 was another recordbreaking year in the electricity and gas utilities sector. Total deal values shot through the record level set in 2005 to reach a dizzying USD 298.8bn. This is nearly seven times the USD 43bn level of transactions recorded in the sector only three years earlier in 2003. The rise is all the more astonishing as it comes in a year when deal activity from corporate US utility players plummeted. The sharp downturn in North America came as companies took stock of aggressive regulatory stances from some state regulators during a US midterm election year that coincided with the ending of rate freezes and reaction to the repeal of the Public Utilities Holding Company Act. North American electricity deal values by bidder fell 64% to USD 20.7bn, not far above the USD 16.7bn level of 2003. The picture in Europe and the Asia Pacific region was very different. Both regions recorded record levels of power deal activities as utility companies continued to strive for super regional'' scale. Deal activity in Europe was given extra momentum by the countdown to the July 2007 implementation of full retail market liberalisation. This report examines the rationale behind the overall trends and the key individual deals. We also highlight, in a series of deal dialogues throughout the report, some of the critical issues for companies engaging in deal activity within the sector drawing on our global experience as an adviser to players in major deals throughout the sector in all key power and gas markets. Looking to the future, the regulatory environment will play a key role in determining the course of deal activity. Companies entering into big deals need to be ready more than ever for the long haul. However, the underpinning momentum in the sector remains strong and this is likely to create continued buoyancy in the period ahead

  14. Power Deals. Mergers and acquisitions activity within the global electricity and gas market. 2006 Annual Review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-01-15

    2006 was another recordbreaking year in the electricity and gas utilities sector. Total deal values shot through the record level set in 2005 to reach a dizzying USD 298.8bn. This is nearly seven times the USD 43bn level of transactions recorded in the sector only three years earlier in 2003. The rise is all the more astonishing as it comes in a year when deal activity from corporate US utility players plummeted. The sharp downturn in North America came as companies took stock of aggressive regulatory stances from some state regulators during a US midterm election year that coincided with the ending of rate freezes and reaction to the repeal of the Public Utilities Holding Company Act. North American electricity deal values by bidder fell 64% to USD 20.7bn, not far above the USD 16.7bn level of 2003. The picture in Europe and the Asia Pacific region was very different. Both regions recorded record levels of power deal activities as utility companies continued to strive for super regional'' scale. Deal activity in Europe was given extra momentum by the countdown to the July 2007 implementation of full retail market liberalisation. This report examines the rationale behind the overall trends and the key individual deals. We also highlight, in a series of deal dialogues throughout the report, some of the critical issues for companies engaging in deal activity within the sector drawing on our global experience as an adviser to players in major deals throughout the sector in all key power and gas markets. Looking to the future, the regulatory environment will play a key role in determining the course of deal activity. Companies entering into big deals need to be ready more than ever for the long haul. However, the underpinning momentum in the sector remains strong and this is likely to create continued buoyancy in the period ahead.

  15. Corporate Branding and Corporate Reputation

    DEFF Research Database (Denmark)

    Karmark, Esben

    2013-01-01

    Corporate branding has been seen as developing in “waves”. This chapter explores the links between corporate branding and corporate reputation as they emerge in the context of three waves of corporate branding. It highlights the way in which the two constructs have related to each other through o...... for corporate brands and corporate communication.......Corporate branding has been seen as developing in “waves”. This chapter explores the links between corporate branding and corporate reputation as they emerge in the context of three waves of corporate branding. It highlights the way in which the two constructs have related to each other through...... organizational culture and identity, and how, although characterized by parallel developments, new ideas and models from a “third” wave of corporate branding challenge prevailing assumptions of corporate reputation particularly in terms of the assumptions that reputations emerge from authentic and transparent...

  16. THE CHANGING ROLES OF TRADE UNIONS IN INDIA: A CASE STUDY OF NATIONAL THERMAL POWER CORPORATION (NTPC, UNCHAHAR

    Directory of Open Access Journals (Sweden)

    Piyali Ghosh

    2009-01-01

    Full Text Available Trade unions are a major component of the system of modern industrial relations in any nation, each having, in their constitution, their own set of objectives or goals to achieve. Change in the political, social and educational environment has seen them rechristened as a forum that protects and furthers workers' interests and improves the quality of life of workers, enlarging their traditional roles of establishing terms and conditions of employment. This paper focuses on plant level trade unions, particularly those of the National Thermal Power Corporation (NTPC Unchahar plant, one of the largest and best Public Sector Undertakings of India. This exploratory study of the different trade unions operational at the Unchahar plant will also highlight their ideologies, objectives and structures. We aim to capture the changing paradigms in the roles of plant-level unions: from maintaining good industrial relations, once considered their primary role, they now work actively to improve the quality of life of workers, a role earlier considered to be secondary.

  17. Beyond the 100 acre wood : In which international human rights law finds new ways to tame global corporate power

    NARCIS (Netherlands)

    Augenstein, Daniel; Kinley, David

    2015-01-01

    States and corporations are being forced out of their comfort zones. A consensus is building among international human rights courts and committees that states can and will be held accountable for overseas human rights abuses by corporations domiciled in their respective territories. The authors

  18. Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors

    International Nuclear Information System (INIS)

    1993-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC's Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992

  19. Corporate political activities, religiosity and corporate decision making

    OpenAIRE

    Low, Yik Pui

    2017-01-01

    Motivated by the recent increase in corporate political spending and the Supreme Court’s decision in allowing firms to freely use their treasury funds for political purposes (Citizens United v Federal Election Commission, 2010), this study examines the impact of corporate political activity (CPA) on its decision making. CPA is defined as the firm’s total annual lobbying expenses arising from the engagement of internal and external lobbyists while corporate decision making is measured in terms...

  20. The 'International' and the 'Global' as Complementary Power Strategies within Corporate Roman Catholicism

    Directory of Open Access Journals (Sweden)

    Kenneth Houston

    2010-09-01

    Full Text Available The putative resurgence of religious belief and its reinvigorated socio-political importance – or at least prominence – has prompted critical reflection on religion, broadly defined, as a new force in politics. This paper examines the ‘global’ and ‘international’ role of Roman Catholicism. Roman Catholicism has manifested itself as an actor on the international stage and as a trans-national and global ‘community’. Frequently the conceptual dividing line between these is ambiguous. Vatican City and the Holy See have both been accorded international status, the former since the conclusion of the Lateran Treaty by Italy’s fascist leader, Benito Mussolini, in 1929, the latter since the mid nineteenth century following the absorption of the Papal States into the newly unified Italian Republic. The Holy See also enjoys a special status position within the United Nations system as a non-member observer state. Following revelations of clerical child abuse the Holy See was put on the defensive in several national contexts in a public controversy that resonated much more widely. This trans-nationally organised religion has mobilised both nationally and internationally to defend its institutional interests. Through an examination of empirical instances the study sidesteps the question of whether religions are ‘global’ or ‘international’ phenomena, and draws attention to the distinct power modalities operative at the level of both international politics and in transnational or global organisation.

  1. Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report

    International Nuclear Information System (INIS)

    2000-01-01

    OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants

  2. Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-08-01

    OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.

  3. Areva 2005 annual report

    International Nuclear Information System (INIS)

    2005-01-01

    This annual report contains information on AREVA's objectives, prospects and strategies, particularly in Chapters 4 and 7, as well as contains information on the markets, market shares and competitive position of the AREVA group. Content: 1 - Person responsible for the annual report and persons responsible for auditing the financial statements; 2 - Information pertaining to the transaction; 3 - General information on the company and share capital: Information on AREVA, Information on share capital and voting rights, Investment certificate trading, Dividends, Organizational chart of the AREVA group, Equity interests, Shareholders' agreements; 4 - Information on company operations, 5 - New developments and future prospects: Overview and strategy of the AREVA group, The Nuclear Power and Transmission and Distribution markets, AREVA group energy businesses, Front End Division, Reactors and Services Division, Back End Division, Transmission and Distribution Division, Major Contracts, The Group's principal sites, AREVA's customers and suppliers, Human resources, Sustainable Development and Continuous Improvement, Capital spending programs, Research and development, intellectual property and brand name programs, Risk and insurance; 6 - Assets - Financial position - financial performance: Analysis of and comments on the Group's financial position and performance, Human Resources report 2005, Environmental report, Consolidated financial statements, Notes to the consolidated financial statements, AREVA SA Financial statements 2005, Notes to the corporate financial statements; 7 - Corporate governance: Composition and functioning of administrative bodies, Executive compensation, Profit-sharing plans, AREVA Values Charter, Annual General Meeting of Shareholders of May 2, 2006; 8 - Recent developments and outlook: Events subsequent to year-end closing for 2005, Outlook

  4. Change of risk information disclosure in annual report. Before and after earthquake disaster

    International Nuclear Information System (INIS)

    Ueno, Takefumi

    2011-01-01

    This research examines how risk information disclosure is changing in annual report before and after East Japan Great Earthquake Disaster. Company voluntary disclose risk information in annual report. Manager can decide a style and items of risk information. This paper explores risk information disclosures of Tokyo Electric Power Company, Chubu Power Electric Company, Kansai Electric Power Company and Toyota Motor Corporation. The managers except Tokyo Electric Company are likely to disclose own catastrophe risk before the disaster. However, they do not try to reduce their risk. Corporations' risk information do not link with own risk management. (author)

  5. Biological recipient control at the Ringhals nuclear power plant. Annual report for 2011

    International Nuclear Information System (INIS)

    Jansson, Maria; Gustavsson, Frida; Fagerholm, Bjoern

    2012-01-01

    The cooling system of the Ringhals nuclear power plant affects the fish community in two steps. In the first step, seawater is used to cool the system in the nuclear power plant. Fish eggs, larvae and small juveniles are carried by the incoming water and are exposed to risk of damage or mortality. In the second step the heated water is released back into the sea, where the fish is affected by the increase in temperature. Reactor 1 and reactor 3 at Ringhals nuclear power plant produced electricity during the major part of the year 2011, with exceptions for the annual audits, and shorter stops in production. Reactor 2 only operated between January and April, due to a fire which led to a shutdown and a thorough remediation work during the rest of the year. Reactor 4 was producing electricity from January to June, but was later shutdown due to a prolonged annual audit until November. Fish eggs and fish larvae are sampled in the incoming cooling water using a modified Bongo net to monitor losses of eggs and larvae in the nuclear power plant. The abundance of shorthorn sculpin larvae (Myoxocephalus scorpius) has decreased since the sampling period started, although it is still the most abundant larvae. Also the abundance of rock gunnel larvae (Pholis gunnellus) has decreased over the years. To sample juvenile fish a modified Isaacs-Kidd midwater-trawl is used. This sampling is mainly focused on glass eels (Anguilla anguilla). The abundance of glass eels have declined strongly since the beginning of the 1980's, but a minor increase was observed in 2011. The decline of the glass eel abundance is most probably due to a general decrease in recruitment and not to a local effect caused by the nuclear power plant. The effects of the heated water released into the sea are monitored by fykenet surveys in the recipient as well as in a reference area. These two areas are monitored in two seasons to compare differences between the two areas in naturally cold and warm water of the

  6. Corporate finance

    OpenAIRE

    P. Quiry; Y. Le Fur; A. Salvi; M. Dallocchio; P. Vernimmen

    2011-01-01

    Corporate Finance: Theory and Practice, 3rd Edition, the website www.vernimmen.com and the Vernimmen.com newsletter are all written and created by an author team who are both investment bankers/corporate financiers and academics. This book covers the theory and practice of Corporate Finance from a truly European perspective. It shows how to use financial theory to solve practical problems and is written for students of corporate finance and financial analysis and practising corporate financie...

  7. Corporate social responsibility and corporate governance in Indonesian public listed companies

    OpenAIRE

    Ika Siti Rochmah; Dwiwinarno Titop; Widagdo Ari Kuncara

    2017-01-01

    This study aims to investigate whether theree has been a change in the level of corporate social responsibility (CSR) disclosure and to examine whether corporate governance attributes influence CSR disclosure in corporate annual report of Indonesian public listed companies(PLCs). The annual reports of 115 PLC for two years (2011 and 2012) were analysed using content analysis. Multiple regression analysis was utilized to determine factors influencing CSR disclosure in annual reports. Consisten...

  8. ORNL Superconducting Technology Program for Electric Power Systems: Annual Report for FY 1999

    Energy Technology Data Exchange (ETDEWEB)

    Hawsey, R.A.

    2000-06-13

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by U.S. industry for development of electric power applications of high-temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1999 Annual Program Review held July 26-28, 1999. Aspects of ORNL's work that were presented at the International Cryogenic Materials Conference and the Cryogenic Engineering Conference (July 1999) are included in this report, as well. This ORNL program is highly leveraged by the staff and other resources of U.S. industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with U.S. industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire-using systems.

  9. ORNL Superconducting Technology Program for Electric Power Systems, Annual Report for FY 1999

    Energy Technology Data Exchange (ETDEWEB)

    Hawsey, R.A.; Murphy, A.W

    2000-04-01

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by U.S. industry for development of electric power applications of high-temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1999 Annual Program Review held July 26--28, 1999. Aspects of ORNL's work that were presented at the International Cryogenic Materials Conference and the Cryogenic Engineering Conference (July 1999) are included in this report, as well. This ORNL program is highly leveraged by the staff and other resources of U.S. industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with U.S. industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire-using systems.

  10. ORNL Superconducting Technology Program for electric power systems. Annual report for FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    Koncinski, W.S. [ed.; Hawsey, R.A. [comp.

    1997-05-01

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy`s Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by US industry for commercial development of electric power applications of high temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1996 Annual Program Review held July 31 and August 1, 1996. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high temperature superconductor wire and wire-using systems.

  11. ORNL Superconducting Technology Program for electric power systems. Annual report for FY 1995

    International Nuclear Information System (INIS)

    Hawsey, R.A.; Turner, J.W.

    1996-05-01

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by U.S. industry for commercial development of electric power applications of high-temperature superconductivity. The two major elements of this program are wire development and systems development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from information prepared for the FY 1995 Annual Program Review held August 1-2, 1995. This ORNL program is highly leveraged by the staff and other resources of U.S. industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with U.S. industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire-using systems

  12. Review of annual radioecological studies carried out since 1991 in the French nuclear power plants environment

    International Nuclear Information System (INIS)

    Duffa, C.; Gontier, G.; Renaud, P.

    2004-01-01

    Since 1991, the IRSN carries out annual radioecological studies in the environment of the French Nuclear Power Plants. More than 5,000 samples, collected in terrestrial and aquatic ecosystems around the 20 studied plants, have been analysed by low-level gamma spectrometry. This paper presents the main goals and methods for such studies, and the lessons learnt from 11 years results. The French NPP routine atmospheric releases do not lead to detectable radioactive inputs into their surroundings. For this reason, IRSN decided to reduce the number of analysis concerning terrestrial samples since 2000. On the other hand, NPP liquid discharges into rivers are responsible for the presence of low 60 Co, 58 Co, 110m Ag and 54 Mn activities and significant difference in 137 Cs/ 134 Cs activity ratios measured in aquatic compartments. Radioactive discharges of artificial gamma emitters are also detectable in the Channel marine environment around NPP. Nevertheless, this influence is often concealed by radionuclides released by COGEMA-La Hague nuclear reprocessing plant. Beyond important evaluations concerning the presence of artificial radionuclides in NPP's environment, studies conducted since 1991 give us an important database that can be used for a better knowledge of transfers and distribution of radioactivity through the environment. (author)

  13. Rocketdyne Propulsion and Power DOE Operations annual site environmental report 1997

    International Nuclear Information System (INIS)

    Robinson, K.S.

    1998-01-01

    This annual report discusses environmental monitoring at two manufacturing and test sites operated in the Los Angeles area by Rocketdyne Propulsion and Power of Boeing North American, Inc. These are identified as Area 4 of the SSFL and the De Soto site. These sites have been used for research and development (R and D), engineering, and testing in a broad range of technical fields primarily in energy research and nuclear reactor technology. The De Soto site had research and development laboratories involved with nuclear research. This work was terminated in 1995 and only D and D activities will have potential for impact on the environment. Since 1956, Area 4 has been used for work with nuclear materials, including fabricating nuclear reactor fuels, testing nuclear reactors, and dissembling used fuel elements. This work ended in 1988 and subsequent efforts have been directed toward decommissioning and decontamination of the former nuclear facilities. The primary purpose of this report is to present information on environmental and effluent monitoring of DOE-sponsored activities to the regulatory agencies responsible for oversight. Information presented here concentrates on Area 4 at SSFL, which is the only area at SSFL where DOE operations were performed

  14. Rocketdyne Propulsion and Power DOE operations annual site environmental report 1996

    International Nuclear Information System (INIS)

    Tuttle, R.J.

    1997-01-01

    Rocketdyne currently operates several facilities in the San Fernando Valley/Simi Valley area, for manufacturing, testing, and research and development (R and D). These operations include manufacturing liquid-fueled rocket engines, such as the Space Shuttle Main Engine (SSME) and engines used for expendable launch vehicles used to place artificial satellites into orbit. This work includes fabrication and testing of rocket engines, lasers, and heat-transfer systems; and R and D in a wide range of high-technology fields, such as the electrical power system for the Space Station. Previously, this work also included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International Division (AI). AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. This nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. The majority of this work is done for the Department of Energy (DOE). This Annual Site Environmental Report for 1996 concentrates on the environmental conditions related to DOE operations at Area IV of SSFL and at De Soto

  15. ORNL Superconducting Technology Program for Electric Power Systems--Annual Report for FY 2001

    Energy Technology Data Exchange (ETDEWEB)

    Hawsey, RA

    2002-02-18

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by US industry for development of electric power applications of high-temperature superconductivity. The two major elements of this program are wire development and applications development. A new part of the wire research effort was the Accelerated Coated Conductor Initiative. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 2001 Annual Program Review held August 1-3, 2001. Aspects of ORNL's work that were presented at the International Cryogenic Materials Conference/Cryogenic Engineering Conference (July 2001) are included in this report as well. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. Interlaboratory teams are also in place on a number of industry-driven projects. Working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire-using systems.

  16. Corporate Law and Corporate Governance

    OpenAIRE

    Roberta Romano

    1998-01-01

    We have seen a revival in interest in corporate law and corporate governance since the 1980s, as researchers applied the tools of the new institutional economics and modern corporate finance to analyze the new transactions emerging in the 1980s takeover wave. This article focuses on three mechanisms of corporate governance to illustrate the analytical usefulness of transaction cost economics for corporate law. They are the board of directors; relational investing, a form of block ownership in...

  17. National Nuclear Corporation Limited report and financial statements 31 March 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The paper presents the annual report and audited financial statements of the National Nuclear Corporation Limited, 31 March 1987. The company is engaged in designing and constructing power stations and nuclear power reactors and other related work. A review of the development work carried out on power stations is briefly given, along with the research and development work on reactors. Future prospects concerning the Sizewell-'B' project are briefly outlined. (U.K.)

  18. Development of transnational corporations in the world: opportunities and threats

    Directory of Open Access Journals (Sweden)

    Alexandra NICULA

    2015-06-01

    Full Text Available Transnational corporations (TNCs are incorporated or unincorporated enterprises comprising parent enterprises and their foreign affiliates. Transnational Corporations exert a great deal of power in the globalized world economy. Many corporations are richer and more powerful than the states that seek to regulate them. Through mergers and acquisitions corporations have been growing very rapidly and some of the largest TNCs now have annual profits exceeding the GDPs of many low and medium income countries. TNCs dominate the global economy and exert their influence over global policymaking. Worldwide companies start the trend in many domains having a big range of competitors. Trade is an important development tool. Trade between developing and industrialized countries has expanded and borrowing from rich countries to the poor areas of this world increased. The links between these differing groups of economies intensified subsequently and made these two groups increasingly dependent from each other. TNCs based their activity around this idea. In this paper, we try to emphasize the role of the TNCs in the worldwide economy, the advantages and disadvantages these corporations bring to the countries they activate in and even to the entire world and what effect they have on globalization. Some opportunities and threats of TNS activity are presented, exemplifying through some well known corporations which succeded in this competitive world. The authors wanted in this way to show the positive and negative aspects of their performance and give the reader the opportunity to develop the own opinion.

  19. Health profile of employees of Nuclear Power Corporation of India Ltd. (NPCIL): a retrospective analysis (1995-2010)

    International Nuclear Information System (INIS)

    Daniel, M.S.

    2012-01-01

    Full text: NPCIL with 20 operating units and 6 under construction is contributing the power generation of India in a safe and environmental friendly way. Spread across the country, NPCIL units are serving the nation since 25 years with present installed capacity of 4780 MWe. 'Radiation' is a term associated with nuclear power generation and is a concern for public because of the misconceptions related to it. In reality the proper use of radiation is a boon to the society especially in the field of agriculture, industry and in medicine. According to various studies carried out by international scientific groups in areas with highest exposure to radiation, there was not any increase in disease due to direct or biological effects of radiation. More over there is no significant increase in cancer due to working in a nuclear power plant or residing near to it. The Annual Medical examination of all the employees of a nuclear power plant is a statutory requirement as per the Radiation Protection rules of Govt. of India and it is scrutinised by the Atomic Energy Regulatory Board (AERB). Data of the health profile for 16 years period (i.e. 1995-2010) of employees of all units of NPCIL were collected and analysed. Prevalence of major disease like diabetes mellitus, Hypertension, coronary artery disease, respirator disease were comparable to other state-wise or national studies. Anaemia is found to be practically non-existent. Total number of cancer cases from all units for the said 16 years period was 80 (41 amongst radiation workers and 39 in non radiation workers). Average incidence rate and death rate due to cancer in male, female and combined population (both sexes) is less than the respective national average in each category. This health profile analysis of NPCIL employees shows that their health status is well comparable to the other studies conducted elsewhere across the country for general public and they do not show any variation in disease pattern nor do they have

  20. Annual report 1991

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    In 1991, the Corporation undertook an examination of its future direction, having completed the divestment mandate assigned to it in 1986. This examination resulted in a reorientation of the Corporation`s objectives toward enhancing participation in the energy sector by the Aboriginal Peoples and northern communities of the province. The Corporation`s cash assets increased to $33 million in 1991, largely attributable to a Suncor dividend of $14.2 million. The financial statements have been prepared by management in accordance with generally accepted accounting principles. Management is also responsible for the other information in the annual report, which is consistent with that contained in the financial statements.

  1. IS AN INTERNATIONAL CORPORATE HUMAN RIGHTS LIABILITY FRAMEWORK NEEDED? AN ECONOMIC POWER, BUSINESS AND HUMAN RIGHTS, AND AMERICAN EXTRATERRITORIAL JURISDICTION ANALYSIS

    Directory of Open Access Journals (Sweden)

    Carlos Arevalo

    2013-11-01

    Full Text Available All companies, regardless of the sector they belong to, can positively or negatively impact human rights. Governments are increasingly aware of the benefits that free trade brings their nations, which has led them to do whatever is necessary to attract foreign investment, even if it means to act against the interests of their own people. The power relationship between corporations and states generates a tension derived from their nature: while the objective of states is the welfare of its members, the purpose of corporations is profit. It is in the crack generated by the collision of powers and purposes between these two actors, that this article is intended to raise the discussion on the need to establish an international framework for corporate liability for human rights violations. To achieve its goal, the article will analyze the opportunities and obstacles raised by the exercise of extraterritorial jurisdiction in the American context and its relationship with the developments in the business and human rights field.

  2. Annual limits on intake for aerosols in the working environment on Magnox power stations

    International Nuclear Information System (INIS)

    Bosch, F.G.C.; Harte, G.A.

    1983-09-01

    Annual Limits on Intake (ALIs) for inhaled radionuclides given by the International Commission on Radiological Protection are derived for single isotopes and for an aerosol size (AMAD) of 1 micron. A recent investigation into aerosols in the pond hall of a Magnox Power Station has demonstrated that the aerosol in the pond hall consists of particles of corroded fuel and that the size distribution has an AMAD nearer 6 microns than 1 micron. Experiments in rodents with a simulated pond hall aerosol indicate that clearance characteristics of these particles in the lung are closer to ICRP's class W classification than to any other. Accordingly ALIs were calculated as a function of particle size and for various cooling times for Magnox-fuel of burnup 3500 MWd/t and 7000 MWd/t. Separate values for alpha and beta activity were derived, based on stochastic and non-stochastic dose limits. For a 6 micron aerosol the ALI (α-activity) based on limiting the committed dose to bone surfaces lies between 120 and 320 Bq, depending on fuel burnup and cooling time. The ALI (β-activity) in the same circumstances lies between 10 4 and 8 x 10 4 Bq. Beta activity in the aerosol is dominated by the fission products but dose is overwhelmingly due to the actinides in the fuel. In addition an attempt was made to construct or to find a lung model which more closely represented the observed clearance to blood in the animal experiments. A recent model for large inhaled particles derived at the NRPB was found to give the best fit to the experimental data. ALIs derived on the basis of this model, for a 6 micron aerosol, are roughly 2 times higher than those based completely on the ICRP recommendations. (author)

  3. Pengungkapan Corporate Social Responsibility, Struktur Corporate Governance dan Nilai Perusahaan

    Directory of Open Access Journals (Sweden)

    Salmah Pattisahusiwa

    2017-06-01

    Full Text Available The concept of the corporate social responsibility has a significant interest in Indonesia because believed to increase corporate’s value for shareholders. This study aims to find the effect of corporate social responsibility disclosure and corporate governance structure on corporate value. The data were taken from annual report of mining companies listed in Indonesian Stock Exchange for period of 2014-2015. The sample collection has been done by using purposive sampling with the certain criteria so that 18 companies which meet criteria have been obtained as samples. Multiple Regression analysis was employed to analyze data. The result of this research show that corporate social responsibility disclosure and corporate governance structure have significant effect to thecorporate value.

  4. Annual report 1987-88

    International Nuclear Information System (INIS)

    1988-01-01

    The annual report of the Department of Atomic Energy (India) for the financial year 1987-88 describes: (1) Research and Development (R and D) activities of its research establishments, namely, the Bhabha Atomic Research Centre, Bombay; the Indira Gandhi Centre for Atomic Research, Kalpakkam and the Centre for Advanced Technology, Indore; and of almost fully funded research institutions, namely, the Tata Institute of Fundamental Research, Bombay; Tata Memorial Centre, Bombay; Saha Institute of Nuclear Physics, Calcutta; and Institute of Physics, Bhubaneshwar; (2) performance of nuclear power stations at Tarapur, Rawatbhata and Kalpakkam, various heavy water plants around the country, the Nuclear Fuel Complex, Hyderabad, fuel reprocessing plants, (3) exploration work for atomic minerals, (4) regulatory and safety functions, (5) performance of public sector undertakings, namely, Indian Rare Earths Ltd., Electronics Corporation of India Ltd., and Uranium Corporation of India Ltd., (6) other activities including international relations, financial assistance to research schemes in science and engineering etc. During the year, the Nuclear Power Board was converted into Nuclear Power Corporation (NPC) of India Ltd. with the objectives of managing the nuclear power stations on commercial lines and raising finance from the public for its projects. The Board of Radiation and Isotope Technology (BRIT) was set up to promote radiation technology on a commercial basis in the country. (M.G.B.). Coloured pictures

  5. GasFair and Power '99 and the Ontario Competitive Power Conference: proceedings of the 8. annual natural gas and electricity market conference

    International Nuclear Information System (INIS)

    1999-01-01

    The 47 presentations at Enerdata's 1999 annual conference and trade show were divided between the GasFair and Power '99 Natural Gas and Electricity Market Conference, and the Ontario Competitive Power Conference. The four major sessions of GasFair and Power '99 included the: (1) gas track, (2) power track, (3) gas and power, and (4) forums and workshops. In general, the papers reviewed the recent activities in the natural gas and electric power industry in North America. The presentations highlighted the recent changes that are occurring as a result of deregulation and new environmental policies. The North American electric power and natural gas industry are moving towards competition. Most market participants will benefit from this change because it creates a more level playing field. Several papers also discussed issues regarding the long-term outlook for new Canadian gas supplies to eastern and midwest markets. Some of the other topics discussed included issues regarding the impact of basis tradin g, tools of the energy marketer, and the advantages of pipeline planning. The challenges facing Ontario Hydro to diversify their existing power generation and to use natural gas for power generation in order to meet energy demand was also discussed. tabs., figs

  6. GasFair and Power '99 and the Ontario Competitive Power Conference: proceedings of the 8. annual natural gas and electricity market conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The 47 presentations at Enerdata's 1999 annual conference and trade show were divided between the GasFair and Power '99 Natural Gas and Electricity Market Conference, and the Ontario Competitive Power Conference. The four major sessions of GasFair and Power '99 included the: (1) gas track, (2) power track, (3) gas and power, and (4) forums and workshops. In general, the papers reviewed the recent activities in the natural gas and electric power industry in North America. The presentations highlighted the recent changes that are occurring as a result of deregulation and new environmental policies. The North American electric power and natural gas industry are moving towards competition. Most market participants will benefit from this change because it creates a more level playing field. Several papers also discussed issues regarding the long-term outlook for new Canadian gas supplies to eastern and midwest markets. Some of the other topics discussed included issues regarding the impact of basis trading, tools of the energy marketer, and the advantages of pipeline planning. The challenges facing Ontario Hydro to diversify their existing power generation and to use natural gas for power generation in order to meet energy demand was also discussed. tabs., figs.

  7. PowerLight Corporation Lean Manufacturing, PV Manufacturing R&D Phase I Report: 6 December 2001--31 March 2003

    Energy Technology Data Exchange (ETDEWEB)

    Hargis, L; Botkin, J.

    2005-06-01

    PowerLight Corporation (PowerLight) has completed Phase I of its PV Manufacturing R&D subcontract, ''PowerGuard Lean Manufacturing,'' Subcontract No. NDO-1-30628-04. The overall technical goal of this project was to reduce the cost of PowerGuard manufacturing while simultaneously improving product quality. This will enable PowerLight to scale up production capacity as the market for PowerGuard continues to grow. Through the introduction of world-class lean manufacturing techniques, PowerLight was to cut out waste in the manufacturing process of PowerGuard. The manufacturing process was to be overhauled with an objective of removing as much as possible those steps that do not add value to the product. Quality of finished goods was also to be improved through the use of statistical process control and error-proofing in the manufacturing process. Factory operations were also to be addressed to streamline those factory activities that support the manufacturing process. This report de tails the progress made toward the above listed goals during the first phase of this subcontract.

  8. Nuclear power in the Midwest: proceedings of the twelfth annual Illinois Energy Conference

    International Nuclear Information System (INIS)

    1984-01-01

    Sessions were devoted to: nuclear waste disposal; power plant safety, decommissioning, and waste transportation; economics of nuclear power; and alternatives to nuclear power. Separate abstracts were prepared for 19 papers

  9. Statistical annual report 2008 - Furnas Electric Power Plants Inc. - Calendar year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    This 30th edition of the statistical annual report of Furnas reports the performance of the company in 2007 and recent years allowing a general view on: Furnas system; production and supply; financial and economic data, personnel and indicators

  10. Total 2004 annual report

    International Nuclear Information System (INIS)

    2004-01-01

    This annual report of the Group Total brings information and economic data on the following topics, for the year 2004: the corporate governance, the corporate social responsibility, the shareholder notebook, the management report, the activities, the upstream (exploration and production) and downstream (refining and marketing) operating, chemicals and other matters. (A.L.B.)

  11. Coordination Between Wind Power, Hydro Storage Facility and Conventional Generating Units According to the Annual Growth Load

    Directory of Open Access Journals (Sweden)

    Shahrokh Shojaeean

    2013-04-01

    Full Text Available Considering the growing trend of the consumption of the electric power and the global tendency to substitute new renewable sources of energy, this paper proposes a Monte Carlo based method to determine an optimal level of this change. Considering the limitation of the wind farms in continuous supply of electric power, hydrostatic power storage facilities are used beside wind farms so that the electric power could be stored and fed in a continuous flow into power systems. Due to the gradual exclusion of conventional generators and 5 percent annual load increments, LOLE index was used in order to calculate the amount of the wind power and the capacity of the necessary power storage facility. To this end, LOLE index was calculated for the first year as the reference index for the estimation of the amount of wind power and the capacity of the storage facility in consequent years. For the upcoming years, calculations have been made to account for the gradual exclusion of conventional generators in proportion to load increments. The proposed method has been implemented and simulated on IEEE-RTS test system.

  12. Regulating Corporate Governance in the EU

    DEFF Research Database (Denmark)

    Horn, Laura

    In the context of the financial and economic crisis, corporate governance and regulatory supervision failures are at the centre of public debates. Who controls the modern corporation, and why, has become one of the defining social power relations in contemporary capitalism. Regulation Corporate...... transformation of company law and corporate governance regulation. Her findings about the marketization of corporate control are at the core to a better understanding of the broader context of capitalist restructuring in the European Union....

  13. Proceedings of the 19th (1988) annual IEEE power electronics specialists conference

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    These proceedings compile papers on power electronics. Topics include: Superconducting Magnetic Energy Storage (SMES); Power control experiments with SMES; Quench protection at cryogenic temperatures; Power system stabilization by SMES; compensation of industrial load variation with SMES; high voltage power supplies with photovoltaic cell arrays; and simulation of photovoltaic systems

  14. Occupational radiation exposure at commercial nuclear power reactors and other facilities, 1990: Twenty-third annual report

    International Nuclear Information System (INIS)

    Raddatz, C.T.

    1993-01-01

    This report summarizes the occupational radiation exposure information that has been reported to the NRC's Radiation Exposure Information Reporting System (REIRS) by nuclear power facilities and certain other categories of NRC licensees during the years 1969 through 1990. The bulk of the data presented in the report was obtained from annual radiation exposure reports submitted in accordance with the requirements of 10 CFR 20.407 and the technical specifications of nuclear power plants. Data on workers terminating their employment at certain NRC licensed facilities were obtained from reports submitted pursuant to 10 CFR 20.408. The 1990 annual reports submitted by about 443 licensees indicated that approximately 214,568 individuals were monitored, 110,204 of whom were monitored by nuclear power facilities. They incurred an average individual dose of 0.19 rem (cSv) and an average measurable dose of about 0.36 (cSv). Termination radiation exposure reports were analyzed to reveal that about 113,361 individuals completed their employment with one or more of the 443 covered licensees during 1990. Some 77,633 of these individuals terminated from power reactor facilities, and about 11,083 of them were considered to be transient workers who received an average dose of 0.67 rem (cSv)

  15. Occupational radiation exposure at commercial nuclear power reactors and other facilities 1992. Twenty-fifth annual report, Volume 14

    International Nuclear Information System (INIS)

    Raddatz, C.T.

    1993-12-01

    This report summarizes the occupational radiation exposure information that has been reported to the NRC's Radiation Exposure Information Reporting System (REIRS) by nuclear power facilities and certain other categories of NRC licensees during the years 1969 through 1992. The bulk of the data presented in the report was obtained from annual radiation exposure reports submitted in accordance with the requirements of 10CFR20.407 and the technical specifications of nuclear power plants. Data on workers terminating their employment at certain NRC licensed facilities were obtained from reports submitted pursuant to 10CFR20.408. The 1992 annual reports submitted by about 364 licensees indicated that approximately 204,365 individuals were monitored, 183,927 of whom were monitored by nuclear power facilities. They incurred an average individual dose of 0.16 rem (cSv) and an average measurable dose of about 0.30 (cSv). Termination radiation exposure reports were analyzed to reveal that about 74,566 individuals completed their employment with one or more of the 364 covered licensees during 1992. Some 71,846 of these individuals terminated from power reactor facilities, and about 9,724 of them were considered to be transient workers who received an average dose of 0.50 rem (cSv)

  16. Occupational radiation exposure at commercial nuclear power reactors and other facilities, 1993. Volume 15, Twenty-six annual report

    International Nuclear Information System (INIS)

    Raddatz, C.T.

    1995-01-01

    This report the occupational radiation exposure information that has been reported to the NRC's Radiation Exposure Information Reporting System (REIRS) by nuclear power facilities and certain other categories of NRC licensees during the years 1969 through 1993. The bulk of the data presented in the report was obtained from annual radiation exposure reports submitted in accordance with the requirements of 10 CFR 20.407 and the technical specifications of nuclear power plants. Data on workers terminating their employment at certain NRC licensed facilities were obtained from reports submitted pursuant to 10 CFR 20.408. The 1993 annual reports submitted by about 360 licensees indicated that approximately 189,711 individuals were monitored, 169,872 of whom were monitored by nuclear power facilities. They incurred an average individual dose of 0.16 rem (cSv) and an average measured dose of about 0.31 (cSv). Termination radiation exposure reports were analyzed to reveal that about 99,749 individuals completed their employment with one or more of the 360 covered licensees during 1993. Some 91,000 of these individuals terminated from power reactor facilities, and about 12,685 of them were considered to be transient workers who received an average dose of 0.49 rem (cSv)

  17. Annual report of operation management in nuclear power stations, fiscal year 1985

    International Nuclear Information System (INIS)

    1986-09-01

    Twenty years have elapsed since the first practical nuclear reactor in Japan started the operation. In the generated power in fiscal year 1985, that of nuclear power stations for the first time overtook that of thermal power stations, and now the age of nuclear power as the main and oil power as the subordinate has begun. As of the end of fiscal year 1985, there were 32 nuclear power plants in operation, having total output capacity of 24.521 million kW. In fiscal year 1985, nuclear power plants generated about 159 billion kWh, which is about 26 % of electric power supply. As to the capacity factor, 76 % was attained in fiscal year 1985, and this is ranked in the top group of LWR-operating countries in the world. It showed that the Japanese technology of nuclear power generation is at the top level in the world. However, in order to increase nuclear power generation and to accomplish the role of main electric power source hereafter, it is necessary to further increase the reliability and economical efficiency. The list of nuclear power stations in Japan, the state of operation of nuclear power stations, the state of accidents and troubles, the state of regular inspection, the management of radioactive wastes and the radiation exposure of workers in nuclear power stations, the operational management and others are reported. (Kako, I.)

  18. Corporate Awakening

    DEFF Research Database (Denmark)

    LaFrance, Julie; Lehmann, Martin

    2005-01-01

    Predominantly since the 1992 Rio Summit, corporations have been increasingly pursuing partnerships with public institutions including governments, international organisations and NGOs that aim to contribute to sustainable development activities. Partnerships have become more common as corporation...... public-private partnerships. These theoretical perspectives are used to gain a deeper understanding of the corporate drivers that motivated TOTAL S.A. to approach UNESCO for cooperation on community development programs in Myanmar....

  19. The corporate security professional

    DEFF Research Database (Denmark)

    Petersen, Karen Lund

    2013-01-01

    In our age of globalization and complex threat environments, every business is called upon to manage security. This tendency is reflected in the fact that a wide range of businesses increasingly think about security in broad terms and strive to translate national security concerns into corporate...... speech. This article argues that the profession of the security manager has become central for understanding how the relationship between national and corporate security is currently negotiated. The national security background of most private sector security managers makes the corporate security...... professional inside the company a powerful hybrid agent. By zooming in on the profession and the practice of national security inside companies, the article raises questions about where to draw the line between corporate security and national security along with the political consequences of the constitution...

  20. Safety of the French power grid: audit and annual reporting; Surete du systeme electrique francais: audit et reporting annuel

    Energy Technology Data Exchange (ETDEWEB)

    Tesseron, J.M. [Reseau de Transport d' Electricite (RTE), 92 - Paris la Defense (France)

    2006-09-15

    Power system reliability is at the core of the responsibilities entrusted to RTE, the French transmission system operator. Considering the particularly important issue of reliability, RTE's management has set up an entity which reports to it directly on this subject. The two main activities of this entity involve drawing up the annual system reliability report and carrying out audits devoted to reliability. After going over the principles governing the control of system reliability in France, the document presents the experience acquired since 2000. The principles underlying the drafting of the annual reliability report and the method for scheduling and performing the reliability audits are first set out. The author then goes on to present how these principles are applied to two reliability audits, one carried out on voltage control and the other on the control of the clearance time of short-circuits affecting the 400 kV grid. (author)

  1. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Bolinger, M.

    2008-05-01

    This report focuses on key trends in the U.S. wind power market, with an emphasis on the latest year, and presents a wealth of data, some of which has not historically been mined by wind power analysts.

  2. Humboldt Bay Power Plant, Unit 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 196,742 MWH with the reactor on line 4078 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  3. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  4. Millstone Nuclear Power Station, Unit 1. Annual operating report: 1 January--31 December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 3,752,445 MWh with the generator on line 6,682 hrs. Information is presented concerning operations; shutdowns and power reductions; refueling; maintenance; failed fuel elements; power generation; occupational personnel radiation exposure; and changes in technical specifications, plant design, and key supervisory personnel

  5. APL: a corporate strategy.

    Science.gov (United States)

    Fox, J; Nyatanga, L; Ringer, C; Greaves, J

    1992-06-01

    This paper is based on, and summarises, papers read at the second annual international conference of Nurse Education Tomorrow held at the University of Durham (UK) September 1991. To this end this paper will offer: Some Accreditation of Prior Learning (APL) definition and process as reflected in the literature available. A distinction will be made between APL and Accreditation of Prior Experiential Learning (APEL) although the procedures and processes for assessing them will be shown to be the same. A brief outline of corporate strategy, as it applies to APL, will be given to form the basis for logical demonstration of how Derbyshire Institute of Health and Community Studies has employed such a corporate strategy. Insights developed and gained from APL research currently being undertaken through the college of nursing and midwifery will be used to inform the development and nature of corporate strategy. A flowchart of the operationalisation of the corporate strategy is offered as an integrative summary of how all the APL ideas have had a positive cumulative effect. The paper finishes by highlighting the possible strengths and limitations of APL corporate strategy.

  6. The Effects of Different Parts of the Annual Report on Potential Investors' Attitudes Towards the Company and on the Corporate Reputation

    NARCIS (Netherlands)

    Karreman, Joyce; de Jong, Menno D.T.; Hofmans, Stefan

    2014-01-01

    Research problem: Both the function and the appearance of annual reports have changed over the last few decades. These multimodal reports now include many types of information that serve different functions. In this study, the effects of several information types on stakeholders' attitudes toward

  7. Effect on the annual atmospheric dispersion factor of different diffusion parameters and meteorological data at nuclear power plant

    International Nuclear Information System (INIS)

    Hu Erbang; Yan Jiangyu; Wang Han; Xin Cuntian

    2003-01-01

    Based on the hourly metrological observing data of 100 m high tower during 1997-1999 at Tianwan Nuclear Power Plant (NPP) site and 1995-1997 in Fujian Huian NPP site, the effect on the annual atmospheric dispersion factor (AADF) of four different diffusion parameters (on-site measuring values, IAEA's, Briggs's and Pasquill's) are estimated. The analysis shows that the deviation between the results from IAEA's, Briggs's and on-site measured diffusion parameters is less than 20%. The effect on the AADF from different years' meteorological data also is estimated. (authors)

  8. Corporate Entrepreneurship

    DEFF Research Database (Denmark)

    Lassen, Astrid Heidemann

    Corporate entrepreneurship is often highlighted as being more relevant than ever, as a viable means for existing organizations to pursue creative new solutions to the complex challenges facing firms today. This includes continuously exploring and exploiting previously unexploited opportunities......, and thereby moving the organization to a new state of being. In spite of a general consensus on a strong interlinkage between the concepts of innovation and corporate entrepreneurship, the nature of this linkage is rarely addressed directly. This has made further research in the two areas problematic, mainly...... nature of corporate entrepreneurship and innovation by exploring the role played by innovation in corporate entrepreneurship. - Develop a framework of corporate entrepreneurial innovation which facilitates an understanding of challenges related hereto and practices applied to overcome these challenges...

  9. Corporate Foundations

    DEFF Research Database (Denmark)

    Herlin, Heidi; Thusgaard Pedersen, Janni

    2013-01-01

    action between business and NGOs through convening, translation, collaboration, and mediation. Our study provides valuable insights into the tri-part relationship of company foundation NGO by discussing the implications of corporate foundations taking an active role in the realm of corporate social...... responsibility (CSR). The paper hence illuminates the fascinating and overlooked role of corporate foundations as potential bridges between business and civil society. It also informs theory on boundary organizations by clarifying challenges and limits of such institutions.......This paper aims to explore the potential of Danish corporate foundations as boundary organizations facilitating relationships between their founding companies and non-governmental organizations (NGOs). Hitherto, research has been silent about the role of corporate foundations in relation to cross...

  10. 77 FR 11169 - In the Matter of Exelon Corporation; Constellation Energy Group, Inc.; R.E. Ginna Nuclear Power...

    Science.gov (United States)

    2012-02-24

    ... Constellation Energy Nuclear Group, LLC (CENG), acting on behalf of itself, and the licensee, requested that the... Constellation Energy Nuclear Group, LLC, shall prepare an Annual Report regarding the status of foreign... or part, of Constellation Energy Nuclear Group, LLC. The Report shall be submitted to the NRC within...

  11. Radioactive materials released from nuclear power plants. Annual report, 1982. Volume 3

    International Nuclear Information System (INIS)

    Tichler, J.; Norden, K.

    1986-02-01

    Releases of radioactive materials in airborne and liquid effluents from commercial light water reactors during 1982 have been compiled and reported. Data on solid waste shipments as well as selected operating information have been included. This report supplements earlier annual reports issued by the former Atomic Energy Commission and the Nuclear Regulatory Commission. The 1982 release data are summarized in tabular form. Data covering specific radionuclides are summarized

  12. Theory "W": The Corporate Warrior.

    Science.gov (United States)

    Morris, David J., Jr.

    1986-01-01

    Describes power structure of corporations functioning under Theory W in which single leaders, in partnership with trusted followers, achieve corporate success. Basis of this industrial structure is attributed to social and developmental structures of prehistoric man and city states. Dimensions of W, X, Y, and Z theories are discussed. (MBR)

  13. Peach Bottom Atomic Power Station, Units 2 and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 2 experienced 11 forced outages, 5 power reductions, and one major refueling outage which lasted about 3 months during which time the feedwater spargers were replaced. Net electrical power generated was 5,569,633 MWH with the generator on line 5,998 hrs. Unit 3 experienced 17 forced outages, 11 power reductions and 2 major outages. The first refueling outage began 12/24/77. Net electrical power generated was 6,049,644 MWH with the unit on line 6,829 hrs. Information is presented concerning operations, personnel exposures, radioactive releases, maintenance, and irradiated fuel examination

  14. Psychosocial work strain of maintenance personnel during annual outage and normal operation in a nuclear power plant

    International Nuclear Information System (INIS)

    Jacobsson, L.; Svensson, O.

    1991-01-01

    This paper reports on a study which evaluates psychosocial work demands during the annual outage for a maintenance work group in a nuclear power plant. The study is based on a stress paradigm and it has been asserted that increased work strain would have a negative effect on performance. Nineteen workers, aged 20-55 years, participated in the study. The subjects filled out a questionnaire comparing work strain during annual outage and normal operation. During the outage period a 3-shift 24-hour work schedule, including nightwork, was used (working hours during normal operation was 7-16). Increased demands on concentration and vigilance, increased time pressure and strain on social relations within the group were found to characterize work during annual outage. Interestingly, for specific work tasks an association was found between the risk of making errors and high psychological workload. Increased work strain, shiftwork including nightwork and reduced social support are important psychosocial risk factors that might contribute to human error during the outage period

  15. Optimization and Annual Average Power Predictions of a Backward Bent Duct Buoy Oscillating Water Column Device Using the Wells Turbine.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Christopher S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bull, Diana L [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Willits, Steven M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Fontaine, Arnold A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-08-01

    This Technical Report presents work completed by The Applied Research Laboratory at The Pennsylvania State University, in conjunction with Sandia National Labs, on the optimization of the power conversion chain (PCC) design to maximize the Average Annual Electric Power (AAEP) output of an Oscillating Water Column (OWC) device. The design consists of two independent stages. First, the design of a floating OWC, a Backward Bent Duct Buoy (BBDB), and second the design of the PCC. The pneumatic power output of the BBDB in random waves is optimized through the use of a hydrodynamically coupled, linear, frequency-domain, performance model that links the oscillating structure to internal air-pressure fluctuations. The PCC optimization is centered on the selection and sizing of a Wells Turbine and electric power generation equipment. The optimization of the PCC involves the following variables: the type of Wells Turbine (fixed or variable pitched, with and without guide vanes), the radius of the turbine, the optimal vent pressure, the sizing of the power electronics, and number of turbines. Also included in this Technical Report are further details on how rotor thrust and torque are estimated, along with further details on the type of variable frequency drive selected.

  16. Kewaunee Nuclear Power Plant, Unit 1. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 3,383,265.0 MWh with the generator on line for 6,926.8 hrs. Information is presented concerning operations, power generation, changes in technical specifications, modifications, steam generator tube inspection, containment leak rate tests, in-service inspection, maintenance, environmental technical specifications, and the radiological monitoring program

  17. Yankee Nuclear Power Station. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 1,251,255 MWH with the reactor on line 7887 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, containment penetration tests, and fuel performance

  18. Annual report on operational management of nuclear power stations, 1979-1980

    International Nuclear Information System (INIS)

    1981-04-01

    This report was compiled by the Agency of Natural Resoures and Energy. The commercial nuclear power stations in Japan started the operation in 1966 for the first time, and as of the end of March, 1981, 22 plants with more than 15.5 million kW capacity were in operation. Nuclear power generation is regarded as the top-rated substitute energy for petroleum, and the target of its development in 1990 is about 52 million kW. The government and the people are exerting utmost efforts to attain the target. The result of the rate of operation of nuclear power stations reached 60.8% in 1980, but it is important to maintain the good, stable state of operation by perfecting the operational management hereafter in order to establish the position of LWRs. At present, the operational management officers of the government stay in nationwide power stations, and supervise the state of operations, thus the system of operational management was strengthened after the Three Mile Island accident in the U.S., and the improvement in the rate of operation is expected. A table shows the nuclear power stations in operation and under construction. The state of operations of individual nuclear power plants in 1979 and 1980, the accidents and failures occurred in nuclear power plants from 1966 to 1980, the minor troubles, the conditions in the regular inspections of individual nuclear power plants, radioactive waste management and the radiation exposure of workers are reported. (Kako, I.)

  19. Development of Innovative Distributed Power Interconnection and Control Systems: Annual Report, December 2000-December 2001

    Energy Technology Data Exchange (ETDEWEB)

    Liss, W.; Dybel, M.; West, R.; Adams, L.

    2002-11-01

    This report covers the first year's work performed by the Gas Technology Institute and Encorp Inc. under subcontract to the National Renewable Energy Laboratory. The objective of this three-year contract is to develop innovative grid interconnection and control systems. This supports the advancement of distributed generation in the marketplace by making installations more cost-effective and compatible across the electric power and energy management systems. Specifically, the goals are: (1) To develop and demonstrate cost-effective distributed power grid interconnection products and software and communication solutions applicable to improving the economics of a broad range of distributed power systems, including existing, emerging, and other power generation technologies. (2) To enhance the features and capabilities of distributed power products to integrate, interact, and provide operational benefits to the electric power and advanced energy management systems. This includes features and capabilities for participating in resource planning, the provision of ancillary services, and energy management. Specific topics of this report include the development of an advanced controller, a power sensing board, expanded communication capabilities, a revenue-grade meter interface, and a case study of an interconnection distributed power system application that is a model for demonstrating the functionalities of the design of the advanced controller.

  20. Beaver Valley Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical energy generated was 441,530 MWH with the generator on line 1714.9 hours. Information is presented concerning operations, maintenance, changes, licensee event reports, power generation, shutdowns and forced power reductions, personnel radiation exposures, and unique reporting requirements

  1. Oyster Creek Nuclear Power Plant, Unit 1. Annual operating report No. 1: January--December 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 3,860,347 MWH with the reactor on line 6,967.3 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, fuel performance, and leak rate testing

  2. Robert Emmett Ginna Nuclear Power Plant, Unit 1. Annual report No. 12: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 2,060,941 MWH with the generator on line 5,115 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, steam generator inspections, containment integrated leak tests, and environmental monitoring

  3. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated was 4,457,836,000 MWH(e) with the reactor on line 6004.2 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance occupational radiation exposure, release of radioactive materials, changes, and fuel history

  4. Corporate Taxation and Corporate Governance

    DEFF Research Database (Denmark)

    Köthenbürger, Marko; Stimmelmayr, Michael

    2009-01-01

    if the corporate tax system exempts the normal return on investment from taxation. The optimal system may well use the full return on investment as a tax base. Hence, tax systems such as an Allowance for Corporate Equity (ACE) or a Cash-flow tax do not have the familiar efficiency-enhancing effects in the presence...

  5. Papers of the 2. annual Canadian Institute conference on interjurisdictional power transactions

    International Nuclear Information System (INIS)

    2002-01-01

    Leaders in the electric power industry from Canada and the United States attended this conference which focused on ways that Ontario's new competitive energy market can maximize its profits through interjurisdictional power transactions with the US northeast and midwest. Topics of discussion included how to target power sales to hotspots in the United States, how to avoid seams issues when wheeling power through jurisdictions, and how to monitor intertie capacity. Other issues were also addressed, including how to manage profits from the financial transmission rights structure, and tracking the latest developments in RTO creation in the United States and its potential impact on interjurisdictional power transactions. A total of 12 papers were presented, of which 4 were indexed separately for inclusion in the database. tabs., figs

  6. Training-induced annual changes in red blood cell profile in highly-trained endurance and speed-power athletes.

    Science.gov (United States)

    Ciekot-Sołtysiak, Monika; Kusy, Krzysztof; Podgórski, Tomasz; Zieliński, Jacek

    2017-10-24

    An extensive body of literature exists on the effects of training on haematological parameters, but the previous studies have not reported how hematological parameters respond to changes in training loads within consecutive phases of the training cycle in highly-trained athletes in extremely different sport disciplines. The aim of this study was to identify changes in red blood cell (RBC) profile in response to training loads in consecutive phases of the annual training cycle in highly-trained sprinters (8 men, aged 24 ± 3 years) and triathletes (6 men, aged 24 ± 4 years) who competed at the national and international level. Maximal oxygen uptake (VO2max), RBC, haemoglobin (Hb), haematocrit (Ht), mean corpuscular volume (MCV), mean corpuscular haemoglobin (MCH), mean corpuscular haemoglobin concentration (MCHC) and RBC distribution width (RDW) were determined in four characteristic training phases (transition, general subphase of the preparation phase, specific subphase of the preparation phase and competition phase). Our main findings are that (1) Hb, MCH and MCHC in triathletes and MCV in both triathletes and sprinters changed significantly over the annual training cycle, (2) triathletes had significantly higher values than sprinters only in case of MCH and MCHC after the transition and general preparation phases but not after the competition phase when MCH and MCHC were higher in sprinters and (3) in triathletes, Hb, MCH and MCHC substantially decreased after the competition phase, which was not observed in sprinters. The athletes maintained normal ranges of all haematological parameters in four characteristic training phases. Although highly-trained sprinters and triathletes do not significantly differ in their levels of most haematological parameters, these groups are characterized by different patterns of changes during the annual training cycle. Our results suggest that when interpreting the values of haematological parameters in speed-power and endurance

  7. Corporal punishment.

    Science.gov (United States)

    Bauman, L J; Friedman, S B

    1998-04-01

    Pediatricians differ on the optimal ways to discipline children. The major controversy surrounds the use of corporal punishment. In an effort to resolve this controversy, the American Academy of Pediatrics (AAP) cosponsored a conference entitled "The Short and Long-Term Consequences of Corporal Punishment" in February 1996. This article reviews scientific literature on corporal punishment and summarizes the proceedings from the conference. The authors conclude that, although the research data are inadequate to resolve the controversy, there are areas of consensus. Practitioners should assess the spanking practices of the parent they see and counsel parents to avoid those that are, by AAP consensus, dangerous, ineffective, or abusive.

  8. Power Generation and Transportation Systems Research Department: 1992 annual status report (Gas Research Institute)

    International Nuclear Information System (INIS)

    Benedict, A.

    1992-09-01

    Activities of Gas Research Institute's Power Generation and Transportation Systems subprogram for the period between October 1, 1991 and September 30, 1992 are summarized. The particular project areas covered in the report are Cogeneration and Power Systems, Engine Technology and Component Development, Natural Gas Vehicles Research, and Electric Power Generation. For each project area a separate chapter is provided. Each chapter includes a rationale for funding the research effort, the goals and objectives to be achieved, a general statement on research accomplishments, and the strategy employed in the project area. Each chapter also contains a series of summary reports on the status of each contract

  9. Insight conference reports : proceedings of the 7. annual Alberta power summit

    International Nuclear Information System (INIS)

    2006-01-01

    This power summit conference provided a forum to discuss issues related to electricity transmission and distribution in Canada. The conference addressed recent regulatory and policy changes related to the electricity industry and provided an update on the Alberta Independent System Operator (AESO). Recent developments in wind power development and integration were also outlined, as well as issues related to power markets. Financial incentive regulations in Ontario were reviewed along with the current status of clean coal technologies. Issues related to biomass energy and rural electrification were also reviewed. One of the 17 presentations featured at this conference has been catalogued separately for inclusion in this database. refs., tabs., figs

  10. Papers of the 3. annual Canadian Institute conference on interjurisdictional power transactions

    International Nuclear Information System (INIS)

    2003-01-01

    Leaders from the electric power industry in both Canada and the United States presented their views on a wide range of topics dealing with interjurisdictional power transactions. Participants presented ideas on how to prepare for the Federal Energy Regulatory Commission's (FERC) proposed new Standard Market Design. They also addressed the issue of how to overcome congestion for seamless power transactions between Canada and the Northeast. The way in which some companies and regions are preparing themselves for locational marginal pricing were also presented. Other topics included the state of the market power mitigation in Ontario, and increased trade potential within Ontario, Quebec and Atlantic Canada. Updates on the Lake Erie Link project were included along with a discussion on the expected impact it may have on trade capacity between Canada and the United States. The conference featured 18 presentations, of which 7 have been indexed separately for inclusion in this database. refs., tabs., figs

  11. Military Power of the People's Republic of China 2006. Annual Report to Congress

    National Research Council Canada - National Science Library

    2006-01-01

    China's rapid rise as a regional political and economic power with global aspirations is an important element of today's strategic environment - one that has significant implications for the region and the world...

  12. Corporate Responsibility

    OpenAIRE

    World Bank

    2004-01-01

    Appeals to corporate responsibility often simply take for granted that businesses have ethical responsibilities that go beyond just respecting the law. This paper addresses arguments to the effect that businesses have no such responsibilities. The interesting claim is not that businesses have no ethical responsibility at all but that their primal responsibility is to increase their profits. The extent to which there is reason to take such arguments seriously delineates the limits of corporate...

  13. Nonprofit Communications from a Corporate Communications Viewpoint

    Science.gov (United States)

    Cross, Ava

    2006-01-01

    Nonprofit organizations, such as social service agencies, charities, and hospitals, plan and prepare communications that are vital to their missions. Although not corporations, these organizations produce news releases, newsletters, and annual reports that are similar to those created in the corporate sector. In this research project for a course…

  14. Systems for Nuclear Auxiliary Power annual report, government fiscal year 1976/TQ

    International Nuclear Information System (INIS)

    1976-01-01

    The overall objective of the Systems for Nuclear Auxiliary Power (SNAP) Program is to continue system and component engineering activities relating to the zirconium hydride (ZrH) reactor. The specific objectives for FY 1976/TQ were to: (1) study standardized ZrH reactor space power systems and components, (2) perform preconceptual analysis and design of ZrH reactor--organic Rankine power systems for subsea applications, (3) conduct fuel and hydrogen barrier investigations, (4) perform system studies in support of the Department of Defense and their contractors as directed by ERDA, (5) test components, and (6) provide for material disposal and facility surveillance. In the study, representative systems which utilize Brayton, Rankine, and Stirling cycle power conversion units as well as thermoelectric modules, are analyzed at power levels of 10, 25, 50, and 75 kWe. Waste heat rejection is accomplished by concentric, cylindrical space radiators which can be nested during launch for space shuttle integration. Subsequent studies, which supported this effort, were completed and provided useful information on system reliability and survivability

  15. Annual report, 1981-82

    International Nuclear Information System (INIS)

    1982-01-01

    The annual report of the Department of Atomic Energy (DAE) for the financial year 1981-82 is presented. The main objectives of the DAE's programmes are generation of electric power from nuclear energy and applications of radioisotopes in agriculture, medicine, industry, research and other areas. Performance of the atomic power stations at Tarapur and Kota, the progress of work of the nuclear power projects at Kalpakkam, Narora and Kakrapar, and the work of the supporting units (of the power programme), namely, the Nuclear fuel Complex at Hyderabad, the heavy water plants -both commissioned and under construction, and the Atomic Minerals Division are surveyed. The research and development activities of the Bhabha Atomic Research at Bombay and the Reactor Research Centre at Kalpakkam, and those of the aided institutions, namely, the Saha Institute of Nuclear Physics at Calcutta, the Tata Institute of Fundamental Research and the Tata Memorial Centre, both at Bombay are described. Performance of the DAE's public sector undertakings, namely, the Indian Rare Earths Ltd., the Electronics Corporation of India Ltd. at Hyderabad, and the Uranium Corporation of India Ltd. at Jaduguda is reported. (M.G.B.)

  16. Fifth annual report Occupational exposures at nuclear power plants 1969-1995

    International Nuclear Information System (INIS)

    1997-01-01

    In order to facilitate the exchange of techniques and experiences in occupational exposure reduction, the Nuclear Energy Agency (NEA) of the Organisation for Economic Co-operation and Development (OECD) launched the Information System on Occupational Exposure (ISOE) on 1 January 1992, after a one year pilot programme. In 1993, an arrangement was agreed between the International Atomic Energy Agency (IAEA) and the NEA by which the IAEA co-sponsors ISOE inviting those IAEA Member States which are not members of the NEA to participate cost-free in the programme. This three-level database joins utilities and regulatory agencies throughout the world, providing occupational data for trending, cost-benefit analyses, technique comparison, information exchange, and other analyses following the ALARA principle. In creating the network for the collection of this data, a forum for direct information and experience exchange was also created, thus allowing operational radiation protection professionals, from both utilities and authorities, to freely exchange ideas, views and experience. This is the Fifth Annual Report produced by the ISOE Programme, and covers the period up to the end of 1995. The analyses presented in this Report focus on the radiological indicators supplied to the NEA 1 database by Participating Utilities. Such reports will be produced annually, the next being expected to be issued in late 1997 and covering the period to the end of 1996. This report was prepared by the ISOE European Regional Technical Centre (ERTC), with the assistance of the NEA ISOE Secretariat, and was reviewed and approved by the Members of the ISOE Steering Group, who also provided valuable comments. The NEA Secretariats is very grateful to the ERTC for its excellent contribution. This report is published under the responsibility of the Secretary-General of the OECD. The opinions expressed are those only, and do not necessarily reflect the point of view of any OECD Member country or of

  17. FY2011 Advanced Power Electronics and Electric Motors Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Susan A. [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2012-01-31

    The Advanced Power Electronics and Electric Motors (APEEM) program within the DOE Vehicle Technologies Program (VTP) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor (EM), thermal management, and traction drive system technologies that will leapfrog current on-the-road technologies. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow’s automobiles will function as a unified system to improve fuel efficiency.

  18. High-Temperature Air-Cooled Power Electronics Thermal Design: Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Waye, Scot [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-08-01

    Power electronics that use high-temperature devices pose a challenge for thermal management. With the devices running at higher temperatures and having a smaller footprint, the heat fluxes increase from previous power electronic designs. This project overview presents an approach to examine and design thermal management strategies through cooling technologies to keep devices within temperature limits, dissipate the heat generated by the devices and protect electrical interconnects and other components for inverter, converter, and charger applications. This analysis, validation, and demonstration intends to take a multi-scale approach over the device, module, and system levels to reduce size, weight, and cost.

  19. FY2010 Annual Progress Report for Advanced Power Electronics and Electric Motors

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Susan A. [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2011-01-01

    The Advanced Power Electronics and Electric Machines (APEEM) subprogram within the Vehicle Technologies Program provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE) and electric motor technologies that will leapfrog current on-the-road technologies. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow’s automobiles will function as a unified system to improve fuel efficiency.

  20. The future of nuclear power: The role of the IAEA. Address at the Uranium Institute: 24th annual symposium, London, 9 September 1999

    International Nuclear Information System (INIS)

    ElBaradei, M.

    1999-01-01

    In his address at the Twenty-fourth Annual Symposium of the Uranium Institute (London, 9 September 1999), the Director General of the IAEA presented a survey of the prospects for nuclear power as seen from the perspective of the IAEA. The speech focussed on the following aspects: nuclear power and world energy needs, nuclear safety, economic performance and competitiveness of nuclear power, public confidence, and the year 2000 computer systems problem

  1. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  2. Power Deals. Mergers and acquisitions activity within the global electricity and gas market. 2007 Annual Review

    International Nuclear Information System (INIS)

    2007-01-01

    The year 2007 saw a continued remarkable expansion in the total number and value of deals in the power utilities sector (electricity and gas) worldwide. A 25% increase put the total power deal value of USD 372.5bn nearly nine times above the US$43bn recorded just four years earlier in 2003. Records continue to be set in the sector for the total number and value of deals and for the size of individual deals. There was little sign of the sector pausing for breath in 2007. There were fewer mega-deals, reflecting the complexity of getting really huge deals over the political and regulatory hurdles, but this was more than compensated by a rise in mid-size deal numbers. There was no clear evidence of a fall-off in deal activity in the second half of the year as the credit crisis broke. Indeed, 57% of all power sector deals, 441 of the total 768 deals, came in the second half. Strong deal momentum characterised all the major markets and, with the restructuring of the Russian electricity sector, 2007 marked the year when deals in the Russian Federation made a significant impact on the worldwide totals. Thus, for the first time, Power Deals 2007 includes a specific section on the Russian deals and we separate them out from the wider Asia Pacific totals where they featured in previous editions

  3. Organic Rankine kilowatt isotope power system. First annual summary report, August 1, 1975--August 1, 1976

    International Nuclear Information System (INIS)

    1976-01-01

    Sundstrand Energy Systems is developing a Kilowatt Isotope Power System (KIPS) directed toward satisfying the higher power requirements of satellites of the 1980's. The KIPS is a plutonium oxide fueled organic Rankine cycle turbine power system which will provide design output power in the range of 500 to 2000 W(e) with a minimum of system changes. Research progress is reported on Phase I comprising: (1) flight system conceptual design and ground demonstration; (2) flight system design and ground qualification; and (3) flight system production, acceptance testing and delivery. The principal objectives of Phase I are to: (1) conceptually design the flight system, (2) based on the flight system concept, design and build the ground demonstration system (GDS), (3) conduct performance and endurance testing using electric heaters to simulate the radioisotope heat source, (4) identify and initiate long lead development efforts required to achieve the initial flight qualification hardware availability date of April 1981, and (5) finalize the flight concept design and prepare the program plan for the Phase II effort

  4. Nuclear powered satellite studies. Annual progress report, July 1, 1977--June 30, 1978

    International Nuclear Information System (INIS)

    Kaplan, M.H.

    1978-06-01

    Progress achieved during the reporting period is reported. Discussions of several pertinent aspects are included, e.g., schedule, personnel, technology developments, and plans. The reporting period represents the second year of activities of a project which is designed to provide continuing support in the area of nuclear space power technology. Important results are summarized

  5. Robert Emmett Ginna Nuclear Power Plant, Unit 1. Annual report No. 11, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Information is presented concerning operations, power reductions, outages, personnel radiation exposures, failed fuel indications, procedure changes, system modification, and special tests. Results from radiation monitoring of dust, fallout, Lake Ontario water, well water, milk, fruit, aquatic ecosystems, and lake bottoms are tabulated

  6. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit was paralleled to the grid 83.1 percent of the time and 7,073,200 MWH gross was generated. There were six scheduled outages and 14 forced outages/load reductions. Information is presented concerning operations, shutdowns, power reductions, inservice maintenance, personnel radiation exposures, fuel history, and facility changes

  7. Power Deals. Mergers and acquisitions activity within the global electricity and gas market. 2007 Annual Review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-01-15

    The year 2007 saw a continued remarkable expansion in the total number and value of deals in the power utilities sector (electricity and gas) worldwide. A 25% increase put the total power deal value of USD 372.5bn nearly nine times above the US$43bn recorded just four years earlier in 2003. Records continue to be set in the sector for the total number and value of deals and for the size of individual deals. There was little sign of the sector pausing for breath in 2007. There were fewer mega-deals, reflecting the complexity of getting really huge deals over the political and regulatory hurdles, but this was more than compensated by a rise in mid-size deal numbers. There was no clear evidence of a fall-off in deal activity in the second half of the year as the credit crisis broke. Indeed, 57% of all power sector deals, 441 of the total 768 deals, came in the second half. Strong deal momentum characterised all the major markets and, with the restructuring of the Russian electricity sector, 2007 marked the year when deals in the Russian Federation made a significant impact on the worldwide totals. Thus, for the first time, Power Deals 2007 includes a specific section on the Russian deals and we separate them out from the wider Asia Pacific totals where they featured in previous editions.

  8. Maine Yankee Atomic Power Plant. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated was 5,928,868 MWH with the generator on line 8,347.6 hrs. Information is presented concerning operating experience; specification procedural, and design changes; surveillance tests; containment leak testing; maintenance; licensee events reports; power generation, shutdowns and load reductions; personnel radiation exposures; and primary coolant chemistry

  9. Interagency advanced power group: Semi-annual compilation of briefs, March 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The Government Research and Development Summaries now available from NTIS are project briefs prepared by the Interagency Advanced Power Group (IAPG). They describe the status of all programs in the fields of advanced power research, development and engineering. Members of the IAPG are the U.S. Army, Navy, and Air Force, U.S. Department of Energy and the National Aeronautics and Space Administration (NASA). Their cooperative effort monitors government-funded research and development producing project briefs in the following working groups: Chemical; Electrical; Magnetohydrodynamic; Mechanical, Nuclear, TE, TI; Solar; and Systems. Each project brief contains title; project description; contract number, period, probable completion date and funding; principle investigator name and telephone number; contractor name and address; directing agency; and index terms

  10. FY2013 Advanced Power Electronics and Electric Motors R&D Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Susan A. [Dept. of Energy (DOE), Washington DC (United States). Vehicle Technologies Office

    2014-02-01

    The Advanced Power Electronics and Electric Motors (APEEM) technology area within the DOE Vehicle Technologies Office (VTO) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor, and traction drive system (TDS) technologies that will leapfrog current on-the-road technologies, leading to lower cost and better efficiency in transforming battery energy to useful work. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow’s automobiles will function as a unified system to improve fuel efficiency through research in more efficient TDSs.

  11. Nuclear powered satellite studies. Annual progress report, July 1, 1978-June 30, 1979

    International Nuclear Information System (INIS)

    Kaplan, M.H.

    1979-06-01

    Progress achieved during the period July 1, 1978 to June 30, 1979, on US DOE contract No. EY-76-S-02-4045.A002 is reported. Discussions of several pertinent aspects are included, e.g., schedule, personnel, technology developments, and plans. The reporting period represents the third year of activities of a project which is designed to provide continuing support in the area of nuclear space power technology. Important results have been obtained and communicated to the scientific community via publications and presentations. Project personnel have participated in point design efforts, a NASA Space Power Committee, and periodically provide support to Department of Energy activities as the need arises. The report is intended to summarize activities over the past year and provide a basis for continued project support by US DOE

  12. Corporate Governance

    Directory of Open Access Journals (Sweden)

    Dragoș-Mihail Daghie

    2011-05-01

    Full Text Available The purpose of this study is to analyze and understand the recently introduced form of managementof a company limited by shares. The Law no. 441/2006, which fundamentally amended Company Law,created this form of controlling the company, the corporate governance, but the legislation does not explicitlydefine what it wants to achieve through this instrument. This topic is recent in research as the theme ofgerman-roman commercial law systems (in French corporate governance system was introduced in 1966 andin Romania in 2006 but in terms of Anglo-Saxon law, the topic has been addressed years since 1776 (AdamSmith: The Wealth of Nations The concept of corporate governance would like, as a result, to establish somerules that companies must comply in order to achieve effective governance, transparent and beneficial forboth shareholders and for the minority. Corporate governance is a key element with an aim at improvingefficiency and economic growth in full accordance with the increase of investors’ confidence. Corporategovernance assumes a series of relationship between the company management, leadership, shareholders andthe other people concerned. Also corporate governance provides for that structure by means of which thecompany’s targets are set out and the means to achieve them and also the manner how to monitor such.

  13. Vermont Yankee Nuclear Power Station. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated was 3,260,016 MWH with the facility on line for 6,776 hrs. Information is presented concerning operation, procedure changes, tests, experiments, plant changes, corrective maintenance, license event reports, forced power reductions, shutdowns, personnel radiation exposures, use of chemicals, plant discharges, cooling tower blowdown, traveling screens, fish impingement, reactor start-up, scram reports, and primary coolant chemistry

  14. Power Deals. Mergers and acquisitions activity within the global electricity and gas market. 2008 Annual Review

    International Nuclear Information System (INIS)

    2009-01-01

    2008 was the year in which power deal values came down from their record-breaking highs of the two preceding years as the financial crisis and a number of market uncertainties had a negative impact on deal activity. Nonetheless, total deal numbers leapt by 24% as companies concentrated on smaller deals and took advantage of new opportunities that arose in the changed market conditions. Europe was least affected by the downturn in deal values and accounted for over half of all bidder and target power deal value. In contrast, power deals in Australia, which had previously been a main motor of growing M and A activity in the Asia Pacific region, virtually stalled as uncertainty over new carbon emission policies combined with the financial crisis to deter deal flow. In North America, like Europe, big deals were fewer but underlying deal activity was comparable with previous years. This report examines the rationale behind the overall trends and the key individual deals. We also highlight, in a series of deal dialogues throughout the report, some of the critical issues for companies engaging in deal activity within the sector, drawing on our global experience as an adviser to players in major deals throughout the sector in all key electricity and gas utilities markets. Looking to the future, the easing of the financial crisis will be key to deal flow but the near-term outlook looks less robust than the recent past, especially as debt markets will be further constrained by calls from the public financing required to support government bail-out programmes. Set against this, the underlying imperatives of consolidation, supply security and capitalisation remain in place and will create increasing pent-up deal demand. A lower energy price environment will change the metrics for more expensive cleaner power assets, placing an even higher importance on the outcome of global climate talks and the run-up to the December 2009 UN Climate Summit in Copenhagen

  15. Power Deals. Mergers and acquisitions activity within the global electricity and gas market. 2008 Annual Review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-01-15

    2008 was the year in which power deal values came down from their record-breaking highs of the two preceding years as the financial crisis and a number of market uncertainties had a negative impact on deal activity. Nonetheless, total deal numbers leapt by 24% as companies concentrated on smaller deals and took advantage of new opportunities that arose in the changed market conditions. Europe was least affected by the downturn in deal values and accounted for over half of all bidder and target power deal value. In contrast, power deals in Australia, which had previously been a main motor of growing M and A activity in the Asia Pacific region, virtually stalled as uncertainty over new carbon emission policies combined with the financial crisis to deter deal flow. In North America, like Europe, big deals were fewer but underlying deal activity was comparable with previous years. This report examines the rationale behind the overall trends and the key individual deals. We also highlight, in a series of deal dialogues throughout the report, some of the critical issues for companies engaging in deal activity within the sector, drawing on our global experience as an adviser to players in major deals throughout the sector in all key electricity and gas utilities markets. Looking to the future, the easing of the financial crisis will be key to deal flow but the near-term outlook looks less robust than the recent past, especially as debt markets will be further constrained by calls from the public financing required to support government bail-out programmes. Set against this, the underlying imperatives of consolidation, supply security and capitalisation remain in place and will create increasing pent-up deal demand. A lower energy price environment will change the metrics for more expensive cleaner power assets, placing an even higher importance on the outcome of global climate talks and the run-up to the December 2009 UN Climate Summit in Copenhagen.

  16. Proceedings of the KIEE Summer Annual Conference 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This is a collection of papers on research conducted by the participants in the 2000 KIEE Summer Annual Conference at the Muju Resort, Korea. The program was operated under the auspices of the Korean Institute of Electrical Engineers (KIEE) with sponsorship and funding from the Korea Electric Power Corporation(KEPCO) and Korea Research Foundation(KRF). There are four research categories such as electric materials, discharge and high-voltage, MEMS and photoelectron, electromagnetic wave.

  17. Indian Nuclear Society annual conference-1994 on advanced technologies related to nuclear power: proceedings

    International Nuclear Information System (INIS)

    Grover, R.B.

    1994-01-01

    The focal theme of the conference is advanced technologies related to nuclear power. Over the past three decades civilian nuclear power plants around the world have accumulated about 6000 reactor years of experience and have performed quite well. Overall safety record has been satisfactory. However, nuclear community is trying to compete with its own record by trying to enhance the safety characteristics of the best operating plant. A safety culture has been established in the nuclear establishments, which is providing impetus to advances in all aspects of nuclear technology all over the world. India has ongoing programmes for the development of advanced reactors and related advanced technologies. Evolution of pressurised heavy water reactors in India, developments made in the design of advanced heavy water reactor and the fast reactor programme, are some of the topics covered in addition to highlighting worldwide developments for the next generation of light water reactors. India is one of the few countries in the world where expertise about complete fuel cycle is available. Developments in the back end of the fuel cycle, use of thorium and plutonium and other related issues are also discussed. Technology control regimes being advocated and adopted by developed nations make it imperative for us to indigenise every equipment and component that goes into a power plant. In view of this, some aspects of manufacturing technologies, inspection techniques and maintenance problems are also covered. Relevant papers are processed separately for INIS. (M.K.V.)

  18. Terrestrial photovoltaic power systems with sunlight concentration. Annual progress report, January 1, 1975--December 31, 1975

    Energy Technology Data Exchange (ETDEWEB)

    Backus, C.E.

    1976-01-31

    This annual report is for the second year of a program to investigate the characteristics of the components and the total system using sunlight concentrated onto solar cells. The second year was primarily to experimentally investigate the conclusions of the first year of analytical studies. Cells have been fabricated that are designed for different intensities. Typically the efficiency of a cell will increase from its 11 percent at AM1 peak to efficiency at the designed concentration level and return to its initial efficiency at about 3 times its designed concentration level. The developed cells have been tested under high intensity simulators and in concentrated sunlight and have shown to have the predicted response. The experimental testing of passive cooling limitations for cooling cells with just finned arrangements in the back of the cell has been completed in the controlled environment of a wind tunnel. These experiments have confirmed the heat transfer coefficients that had been used in the analytical studies. Testing was done to collect heat transfer coefficients for actual wind conditions and these data show good agreement with the controlled wind tunnel data. Four photovoltaic/concentrator system experiments have been started with CR of about 3, 10, 25, and 100. System analysis has indicated that photovoltaic concentration systems may be attractive in low solar irradiation areas such as Cleveland.

  19. The power of commitment : Newfoundland and Labrador Hydro 2000 annual report

    International Nuclear Information System (INIS)

    2000-01-01

    A consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) was presented with particular focus on energy production, energy sales, the Avalon Transmission upgrade, development of the Granite Canal and Hydro's dam safety program. Hydro reported a 4.5 per cent increase in gross energy production at their generating plants throughout the system. Production from hydro sources also increased by 4.5 per cent to a total of 5,032 GWh. Thermal production from the Holyrood generating facility also increased slightly to 1,040 GWh. Production for peaking and emergency requirements from gas turbines and diesel plants dropped to 0.6 GWh. In 2000, about 83 per cent of all the energy supplied to their customers came from hydro sources. Total energy sales were up 4.6 per cent during 2000. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  20. Review of fire behavior during passage of Sandy Lake Fire 13 (NWT) across a Northwest Territories Power Corporation transmission line

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, D.; Thomasson, J.

    2009-03-15

    The Sandy Lake Fire 13 of July 2008 was an intense forest fire that burned up to and across a power line right-of-way in the Northwest Territories, approximately 160 km northwest of Fort Smith. The terrain in the area is flat and vegetation is characterized by boreal pine and black spruce uplands with black spruce and tamarack in lower areas and adjacent to wetlands. This report documented post fire conditions at locations where the fire crossed the power line. The towers on this line were made from an aluminum alloy and may not have had the same resistance to heat damage as steel towers, more commonly used on major transmission lines. The transmission line was de-energized during the fire. Therefore, the effects of fire on power transmission were not documented. Although the intense wildfire crossed sections of the power line, it did not result in observable damage to the towers or lines. Fire intensity was likely greater than 40,000 kw/m along some sections of the right-of-way. Although the management of the right-of-way may have reduced heat exposure to the transmission towers, it did not stop the fire. Pine mixed with an aspen component greater than 50 per cent had a mitigating effect on fire behaviour. The fire did not result in any immediate damage to the power line infrastructure. It was concluded that the use of power lines for fire operations should consider right-of-way width in order to assess equipment maneuverability, especially around tower guy wires. 5 refs., 1 tab., 12 figs.

  1. Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, M.

    2008-10-15

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from 'Freedom' and 'Cooperative Automotive Research'), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Advanced Power Electronics and Electric Machines (APEEM) subprogram within the Vehicle Technologies Program provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on understanding and improving the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of hybrid propulsion systems, the APEEM effort has enabled the development of technologies that will significantly improve advanced vehicle efficiency, costs, and fuel economy. The APEEM subprogram supports the efforts of the FreedomCAR and Fuel Partnership through a three-phase approach intended to: (1) identify overall propulsion and vehicle-related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate technical targets for systems, subsystems, and component research and development activities; (2) develop and validate individual subsystems and components, including electric motors, and power electronics; and (3) determine how well the components and subsystems work together in a vehicle environment or as a complete propulsion

  2. FY2009 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, Mitchell [ORNL

    2009-11-01

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from 'Freedom' and 'Cooperative Automotive Research'), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Oak Ridge National Laboratory's (ORNL's) Advanced Power Electronics and Electric Machines (APEEM) subprogram within the Vehicle Technologies Program provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on understanding and improving the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of advanced vehicle propulsion systems, the APEEM effort has enabled the development of technologies that will significantly improve efficiency, costs, and fuel economy. The APEEM subprogram supports the efforts of the FreedomCAR and Fuel Partnership through a three-phase approach intended to: (1) identify overall propulsion and vehicle-related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate technical targets for systems, subsystems, and component research and development activities; (2) develop and validate individual subsystems and components, including electric motors and power electronics; and (3) determine how well the components and subsystems work together in a vehicle

  3. Annual report 1990-91

    International Nuclear Information System (INIS)

    1991-01-01

    The annual report of the Department of Atomic Energy (DAE), India, for the fiscal year 1990-91 describes: (1) the research and development work carried out by DAE's various research establishments and by fully funded research institutes, (2) performance of nuclear power stations, nuclear fuel complex, fuel reprocessing plants and heavy water plants, (3) exploration work for atomic minerals, (5) regulatory and safety functions, (6) performance of public sector undertakings, namely Indian Rare Earths Ltd., Electronics Corporation of India Ltd., and (6) other activities like international relations, emergency planning, financial assistance to research projects, etc. During the year, 6182 MUs electricity was generated, Unit-1 of Narora Atomic Power Station commenced commercial operation, Hazira Heavy Water Plant was commissioned, Sewage Hygienisation Research Irradiator at Baroda and Heavy Rare Earths Oxide Plant at Udyogmandal were also commissioned, promising geologic deposits of uranium were found at Domiasat (Meghalaya), and PURNIMA-III attained criticality. (M.G.B.)

  4. Knolls Atomic Power Laboratory annual environmental monitoring report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) sites are summarized and assessed in this report. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each site and at off-site background locations.

  5. Knolls Atomic Power Laboratory annual environmental monitoring report, calendar year 1997

    International Nuclear Information System (INIS)

    1997-01-01

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) sites are summarized and assessed in this report. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each site and at off-site background locations

  6. Annual report 1991

    International Nuclear Information System (INIS)

    1991-01-01

    In 1991, the Corporation undertook an examination of its future direction, having completed the divestment mandate assigned to it in 1986. This examination resulted in a reorientation of the Corporation's objectives toward enhancing participation in the energy sector by the Aboriginal Peoples and northern communities of the province. The Corporation's cash assets increased to $33 million in 1991, largely attributable to a Suncor dividend of $14.2 million. The financial statements have been prepared by management in accordance with generally accepted accounting principles. Management is also responsible for the other information in the annual report, which is consistent with that contained in the financial statements

  7. Corporal punishment.

    Science.gov (United States)

    Zolotor, Adam J

    2014-10-01

    Corporal punishment is used for discipline in most homes in the United States. It is also associated with a long list of adverse developmental, behavioral, and health-related consequences. Primary care providers, as trusted sources for parenting information, have an opportunity to engage parents in discussions about discipline as early as infancy. These discussions should focus on building parents' skills in the use of other behavioral techniques, limiting (or eliminating) the use of corporal punishment and identifying additional resources as needed. Copyright © 2014 Elsevier Inc. All rights reserved.

  8. Occupational radiation exposure at light water cooled power reactors. Annual report, 1977

    International Nuclear Information System (INIS)

    Peck, L.J.

    1979-04-01

    This report presents an updated compilation of occupational radiation exposures at commercial light water cooled nuclear power reactors (LWRs) for the years 1969 through 1977. The information contained in this document was derived from reports submitted to the United States Nuclear Regulatory Commission in accordance with requirements of individual plant Technical Specifications, and in accordance with Part 20.407 of Title 10, Chapter 1, Code of Federal Regulations (10 CFR Part 20.407). An additional 4 LWRs completed a full calendar year of commercial operation for the first time in 1977. This report now encompasses data from 57 commercially operating U.S. nuclear power plants. The number of personnel monitored at LWRs increased approximately 10% in 1977, and the average collective dose to personnel (man-rems per reactor-year) increased 14% over the 1976 average. The average number of personnel receiving measurable exposure per reactor increased 11%, and the average exposure per individual in 1977 was 0.8 rem per person

  9. Occupational radiation exposure at commercial nuclear power reactors, 1981. Annual report

    International Nuclear Information System (INIS)

    Brooks, B.G.

    1982-11-01

    This report presents an updated compilation of occupational radiation exposures at commercial nuclear power reactors for the years 1969 through 1981. This year's report contains data received from the 70 light water cooled reactors (LWRs) and one high temperature gas cooled reactor that had been declared to be in commercial operation for at least one full year as of December 31, 1981. This represents an increase of two reactors over the number contained in last year's report. The total number of personnel monitored at LWRs in 1981 was 124,504, a slight decrease from that found in 1980. The number of workers that received measurable doses during 1981 was 82,183 which is about 2000 more than that found in 1980. The total collective dose at LWRs for 1981 is estimated to be 54,142 man-rems, which is only about 350 man-rems more than that reported in 1980. The report also presents a summary and some analyses of the exposure data contained in the termination reports that have been submitted by nuclear power licensees to the Commission pursuant to 10 CFR Section 20.408. As of December 31, 1981, personal identification and exposure information had been collected and computerized for some 210,000 of these terminating reactor personnel

  10. [SaskEnergy, Inc.]. Annual report, 1997

    International Nuclear Information System (INIS)

    1998-01-01

    Annual report of SaskEnergy Inc., a Crown corporation established in 1992 to provide a secure supply of natural gas to over 293,000 customers. The report provides an overview of the year's activities; a corporate profile; financial and operating highlights; details on distribution, transmission and storage; corporate and social responsibility; and the future outlook. Financial statements are included

  11. [SaskEnergy, Inc.]. Annual report 1998

    International Nuclear Information System (INIS)

    1999-01-01

    Annual report of SaskEnergy Inc., a Crown corporation established in 1992 to provide a secure supply of natural gas to over 293,000 customers. The report provides an overview of the year's activities; a corporate profile; financial and operating highlights; details on distribution, transmission and storage; corporate and social responsibility; and the future outlook. Financial statements are included

  12. CORPORATE GOVERNANCE IN ROMANIA. EVOLUTION AND PERSPECTIVES

    Directory of Open Access Journals (Sweden)

    BUȘAN GABRIELA

    2015-03-01

    Full Text Available Thanks to slow way to political, legal, social and economic reform, the corporate governance appears in Romania, from concept and filing, until the early 2000`s. This paper analyzes the evolution of corporate governance in the period 2000-2015, it is presented the OECD principles of corporate governance of companies listed on the Bucharest Stock Exchange and it analyse the situation of the public entities who had the obligation to apply the provisions of O.U.G 109/2011 on corporate governance of public entities and to publish on its Web site the Annual Report

  13. Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, M.

    2006-10-31

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and DaimlerChrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from 'Freedom' and 'Cooperative Automotive Research'), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Vehicle Systems subprogram within the FreedomCAR and Vehicle Technologies Program provides support and guidance for many cutting-edge automotive and heavy truck technologies now under development. Research is focused on understanding and improving the way the various new components of tomorrow's automobiles and heavy trucks will function as a unified system to improve fuel efficiency. This work also supports the development of advanced automotive accessories and the reduction of parasitic losses (e.g., aerodynamic drag, thermal management, friction and wear, and rolling resistance). In supporting the development of hybrid propulsion systems, the Vehicle Systems subprogram has enabled the development of technologies that will significantly improve fuel economy, comply with projected emissions and safety regulations, and use fuels produced domestically. The Vehicle Systems subprogram supports the efforts of the FreedomCAR and Fuel Partnership and the 21st Century Truck Partnership through a three-phase approach intended to: (1) Identify overall propulsion and vehicle-related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate

  14. Biological recipient control at the Oskarshamn nuclear power plant. Annual report for 2011

    International Nuclear Information System (INIS)

    Andersson, Jan; Franzen, Fredrik; Lingman, Anna

    2012-01-01

    Potential ecosystem effects caused by the effluent cooling water from the Simpevarp nuclear power plant, close to Oskarshamn on the Swedish coast of the Baltic Proper, are monitored in yearly surveys using gillnets and fyke nets. Fishing is undertaken at several sites in a coastal gradient starting at the location of the emitted cooling water, and in a reference area 100 km north of the recipient. Soft bottom macro fauna and macro vegetation are monitored both in the gradient and in the reference area. Fish mortality due to entrapment in the cooling water system and commercial landings are monitored to assess the effects on the local fishery. The water used for cooling is normally heated by 10-12 deg C when passing through the power plant. In sheltered parts of the recipient bay of Hamnefjaerden, the surface water was 4-6 deg C warmer in April-November 2011 than in the reference area comparable reference areas and the emitted water occasionally exceeded 30 deg C in the summer. Fish losses in the cooling water rinsing system were dominated by Baltic herring. Effects on abundances at the population level are estimated to be small, but local effects cannot be ruled out. Perch (Perca fluviatilis), roach (Rutilus rutilus) and silver bream (Blicca bjoerkna) dominated the catches in the surveys with gillnets in Hamnefjaerden, as well as in the archipelago surrounding the power plant. Perch abundances increased in these areas. Catches of roach decreased close to the power plant, but also in the reference area. Perch in the gillnet catches were younger and grew faster close to the power plant than in the reference area. Abnormal gonads, previously observed at high frequencies in perch and roach in Hamnefjaerden, were rare in the 2011 sampling. The abundance of young of the year perch in the recipient did not change over time. The size of the perch fry however, increased in Hamnefjaerden, as well as in the local reference area. The catch and size structure of yellow eel

  15. Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors. Volume 7, No. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-07-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC`s Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992.

  16. Annual monitoring and surveillance report for Piqua Nuclear Power Facility, Piqua, Ohio

    International Nuclear Information System (INIS)

    Mosho, G.D.

    1991-12-01

    This report discusses the decommissioned Piqua Nuclear Power Facility which is located in Piqua, Ohio near the Greater Miami River. The Facility was built by the US Atomic Energy Commission (now U. S. Department of Energy) and was operated from 1963 to 1966. The reactor was retired prior to 1970 and the facility was leased to the city of Piqua for use as offices and equipment storage. In December 1991, a radiological survey was done of the facility to document its radiological condition. The data show that all radiological parameters measured were essentially the same as that found in the natural environment. The only exception was that low levels of radioactive contamination were detected in one drain on the 56.5 ft elevation, but the radiation exposure rate in that area was also typical of natural background

  17. Proceedings of the 7. Independent Power Producers' Society of Alberta annual conference

    International Nuclear Information System (INIS)

    2001-01-01

    This conference provided to the delegates from across North America a forum where a wide array of perspectives with regard to the new electric market place of Alberta could be discussed. Speakers covered a lot of ground in their examination of the deregulation of the electricity market in Alberta and the impacts felt by consumers and producers alike. The recent events that led to the deregulation were reviewed and an emphasis was also placed on the successful development of power generation projects, wholesale pricing options and independent retail strategies. Open energy markets were discussed in a series of speaker panels where representatives from private organizations added their views on the topic. The conference was divided into seven sessions entitled: (1) the operation of Alberta's market, (2) panel discussion: defending the market, (3) competitive hurdles to successful development, (4) alternative energy solutions, (5) mechanics of retail choice, (6) wholesale pricing options, and (7) independent retailer strategies. refs., tabs., figs

  18. Insight conference reports : proceedings of the 5. annual Ontario power forum

    International Nuclear Information System (INIS)

    2006-01-01

    This conference provided a forum for members of the electricity industry and other stakeholders to discuss current trends and issues related to electricity generation in Ontario. Presentations given at the conference examined challenges in supply and demand as well as recent changes in local distribution companies. Issues related to the use of nuclear energy were discussed, and new business models using nuclear energy as a primary source of energy were reviewed. Members at the conference also discussed issues related to coal-fired generating plants and new advances in clean coal technology. Electricity prices were also discussed and issues related to wind power integration and electricity generation were reviewed. One of the 20 presentations featured at this conference has been catalogued separately for inclusion in this database. refs., tabs., figs

  19. Reading Ease of Bilingual Annual Reports.

    Science.gov (United States)

    Courtis, John K.; Hassan, Salleh

    2002-01-01

    Examines reading ease between the English and Chinese versions of 65 corporate annual reports in Hong Kong and the English and Malay versions of 53 annual reports in Malaysia. Notes that the English passages in Malaysian annual reports are easier to read than the English passages in Hong Kong annual reports. Suggests that different language…

  20. Corporate entrepreneurship

    DEFF Research Database (Denmark)

    Christensen, Karina

    2005-01-01

    Corporate entreprenørskab kan blive svaret på, hvordan Danmark fremmer en mere videnintensiv produktion. Begrebet er blevet anvendt til at forklare forskellige organisatoriske fænomener alt fra strategi over ledelse i al almindelighed til innovation, hvilket har medført en mangfoldighed af begreb...

  1. Corporate Venturing

    DEFF Research Database (Denmark)

    Vintergaard, Christian

    path of an entrepreneurial opportunity of the Danish corporate venture capitalist,Danfoss A/S. This paper distinguishes itself from previous research done on entrepreneurialopportunities by creating a holistic and conceptual framework, which broadens and expands theperception of the market participants...

  2. Corporate Awakening

    DEFF Research Database (Denmark)

    LaFrance, Julie; Lehmann, Martin

    2004-01-01

    Predominantly since the 1992 Rio Summit, corporations have been increasingly pursuing partnerships with public institutions including governments, international organisations and NGOs that aim to contribute to sustainable development activities. Both the business community and public organisation...... for cooperation on community development programs in Myanmar....

  3. Iranian Corporations and Corporate Social Responsibility

    Directory of Open Access Journals (Sweden)

    Hadi Chapardar

    2011-10-01

    Full Text Available Comparative studies have demonstrated that the themes for corporate social responsibility (CSR initiatives are different among nations and geographic regions based on their cultural, political, legal, social, and economic contexts. In this research, which was conducted on 56 corporations from IMI100 (100 Iranian companies with highest annual sales, ranked by Industrial Management Institute or IMI, CSR themes in priority have been identified. Data collected from a semistructured questionnaire and some complementary interviews were analyzed against the results of a reference study over 100 companies from developed countries. The resulted themes, some of which may have several subthemes, were developed in three economic, environmental, and social categories. Beside these qualitative findings, two indices are constructed for indicating the “importance” of and “contribution” to each theme. The results and discussions are supposed to help business leaders, international companies inside Iran, governmental authorities, and researchers to improve CSR discussions and practices in the country where CSR undergoes a less structured platform.

  4. Occupational radiation exposure at commercial nuclear power reactors and other facilities 1996: Twenty-ninth annual report. Volume 18

    International Nuclear Information System (INIS)

    Thomas, M.L.

    1998-02-01

    This report summarizes the occupational exposure data that are maintained in the US Nuclear Regulatory Commission's (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 1996 annual reports submitted by six of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Since there are no geologic repositories for high level waste currently licensed, only six categories will be considered in this report. Annual reports for 1996 were received from a total of 300 NRC licensees, of which 109 were operators of nuclear power reactors in commercial operation. Compilations of the reports submitted by the 300 licensees indicated that 138,310 individuals were monitored, 75,139 of whom received a measurable dose. The collective dose incurred by these individuals was 21,755 person-cSv (person-rem) 2 which represents a 13% decrease from the 1995 value. The number of workers receiving a measurable dose also decreased, resulting in the average measurable dose of 0.29 cSv (rem) for 1996. The average measurable dose is defined to be the total collective dose (TEDE) divided by the number of workers receiving a measurable dose. These figures have been adjusted to account for transient reactor workers. Analyses of transient worker data indicate that 22,348 individuals completed work assignments at two or more licensees during the monitoring year. The dose distributions are adjusted each year to account for the duplicate reporting of transient workers by multiple licensees. In 1996, the average measurable dose calculated from reported was 0.24 cSv (rem). The corrected dose distribution resulted in an average measurable dose of 0.29 cSv (rem)

  5. Occupational radiation exposure at commercial nuclear power reactors and other facilities 1996: Twenty-ninth annual report. Volume 18

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, M.L. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Regulatory Applications; Hagemeyer, D. [Science Applications International Corp., Oak Ridge, TN (United States)

    1998-02-01

    This report summarizes the occupational exposure data that are maintained in the US Nuclear Regulatory Commission`s (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 1996 annual reports submitted by six of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Since there are no geologic repositories for high level waste currently licensed, only six categories will be considered in this report. Annual reports for 1996 were received from a total of 300 NRC licensees, of which 109 were operators of nuclear power reactors in commercial operation. Compilations of the reports submitted by the 300 licensees indicated that 138,310 individuals were monitored, 75,139 of whom received a measurable dose. The collective dose incurred by these individuals was 21,755 person-cSv (person-rem){sup 2} which represents a 13% decrease from the 1995 value. The number of workers receiving a measurable dose also decreased, resulting in the average measurable dose of 0.29 cSv (rem) for 1996. The average measurable dose is defined to be the total collective dose (TEDE) divided by the number of workers receiving a measurable dose. These figures have been adjusted to account for transient reactor workers. Analyses of transient worker data indicate that 22,348 individuals completed work assignments at two or more licensees during the monitoring year. The dose distributions are adjusted each year to account for the duplicate reporting of transient workers by multiple licensees. In 1996, the average measurable dose calculated from reported was 0.24 cSv (rem). The corrected dose distribution resulted in an average measurable dose of 0.29 cSv (rem).

  6. NRPB corporate plan

    International Nuclear Information System (INIS)

    Clarke, Roger

    1995-01-01

    As with all non-departmental public bodies, the National Radiological Protection Board is required to prepare a Corporate Plan each year. The Plan for 1995/1996 to 1999/2000 is now available as a Board report; extracts from the introductory section are given here. They deal with the Board's statutory duty to provide advice and conduct research and with its power to provide services, all in relation to ionising and non-ionising radiations. (author)

  7. Realizing Corporate Responsibility

    DEFF Research Database (Denmark)

    Girschik, Verena

    and practices at the nascent stages of institutional change. To address this question, the dissertation develops a micro-sociological approach to institutional change that brings to light how actors struggle over meaning in power relations by focusing on processes of positioning and framing. The three articles...... in this dissertation unfold distinct yet interdependent processes of positioning and framing that constitute new ways of performing and understanding corporate responsibility....

  8. CORPORATE GOVERNANCE IN INDIA: STUDY OF the TOP 100 FIRMS

    OpenAIRE

    Rajesh K PILLANIA

    2012-01-01

    The concept of corporate governance is centuries old but it has gained a lot of momentum in last two decades in India. This paper studies the corporate governance practices in the top 100 companies in India. We find that in all industries irrespective of sector all companies practice some sort of corporate governance at least as said in their annual reports due to mandatory requirements. The primary driver mentioned behind the corporate governance practices is the interest of the stakeholders...

  9. Understanding family dynasty: Nurturing the corporate identity across generations

    Directory of Open Access Journals (Sweden)

    Nemilentsev, M.

    2010-01-01

    Full Text Available This study aims to analyse the Ahlstrom annual reports. The content analysis contributes to family business corporate identity. According to the results family business corporate identity is based both on history and on the future. Human resource management, customer relationships, high quality, and also family ownership reflect corporate identity in large family corporations. Modern family business corporate identity is based on continuously developing the business concept and its core competency. Meeting the needs of customers and technical quality standards combined with upgrading and developing the business idea characterises family business corporate identity.

  10. Western Area Power Administration annual site environmental report for calendar year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-12-31

    This document outlines the accomplishments and status of the environmental program of the Western Area Power Administration (Western) for calendar year 2005. In 2005, Western submitted 190 reports to state and local emergency response personnel and had 60 California Hazardous Materials Business Plans in place as required under the Emergency Planning and Community Right-to-Know Act. These reports identify the hazardous substances contained at these sites. At sites where potential oil spills could harm surrounding ecosystems and waterways, Western prepares Spill Prevention, Control, and Countermeasure (SPCC) plans. These plans identify measures to prevent spills from harming the environment, such as identifying the need for secondary containment at facilities. Western currently has SPCC plans for 154 facilities in 13 states. In 2005, Western updated 19 SPCC plans and prepared one new plan. Western operated under 107 environmental permits in 2005. Western evaluates the impact of its planned actions on the environment by preparing National Environmental Policy Act documentation. In 2005, Western completed or was working on 60 categorical exclusions, 18 environmental assessments and eight environmental impact statements, issued six Findings of No Significant Impact, and prepared four Mitigation Action Plans. Western held several public workshops/meetings and consulted with 70 American Indian Tribes for various projects. In 2005, Western was working on or had completed 11 Section 7 consultations under the Endangered Species Act. In 2005, Western recycled more than 3,600 metric tons of electrical equipment, mineral oil dielectric fluid, asphalt, fluorescent and metal halide light bulbs, wood poles and crossarms, and other items as well as office waste. Western made $437,816 worth of purchases containing recovered content materials. Western met the requirement of Executive Order 13148, Greening the Government through Leadership in Environmental Management to have its

  11. Progress report on nuclear science and technology in China (Vol.1). Proceedings of academic annual meeting of China Nuclear Society in 2009, No.7--pulse power technology

    International Nuclear Information System (INIS)

    2010-11-01

    Progress report on nuclear science and technology in China (Vol. 1) includes 889 articles which are communicated on the first national academic annual meeting of China Nuclear Society. There are 10 books totally. This is the seventh one, the content is about nuclear electronics, nuclear detecting technology, pulse power technology, nuclear fusion and plasma

  12. The State of the Corporation

    DEFF Research Database (Denmark)

    Hein Jessen, Mathias

    Today it has become commonplace to claim the demise of the power of the democratic nation-state due to globalization, neoliberal policies and the increasing power of transnational entities (UN, EU, IMF, WTO, World Bank) and multinational corporations. This view, however, prevalent in both public...

  13. Corporate Language and Corporate Talk

    DEFF Research Database (Denmark)

    Zølner, Mette

    2013-01-01

    The article presents the case studies of two Danish based multinational companies (MNCs) which provides the an insight into the role of languages in organizational learning. It mentions that the studies focus on the sharing of the understanding and practices among their employees across the geogr......The article presents the case studies of two Danish based multinational companies (MNCs) which provides the an insight into the role of languages in organizational learning. It mentions that the studies focus on the sharing of the understanding and practices among their employees across...... the geographical borders by the medium of common corporate values for knowledge management, collection of data and analysis in these studies inspired by approach of ground theory and presents a usefulness of distinguishing between corporate language and talks to enable the headquarters learning. Also it concludes...... that both of the MNCs are of Danish origin but executives of both companies are proficient in English language....

  14. Annual report

    International Nuclear Information System (INIS)

    1986-01-01

    This is the thirty-ninth annual report of the Atomic Energy Control Board. The period covered by this report is the year ending March 31, 1986. The Atomic Energy Control Board (AECB) was established in 1946, by the Atomic Energy Control Act (AEC Act), (Revised Statues of Canada (R.S.C.) 1970 cA19). It is a departmental corporation (Schedule B) within the meaning and purpose of the Financial Administration Act. The AECB controls the development, application and use of atomic energy in Canada, and participates on behalf of Canada in international measures of control. The AECB is also repsonsible for the administration of the Nuclear Liability Act, (R.S.C. 1970 c29 1st Supp) as amended, including the designation of nuclear installations and the prescription of basic insurance to be carried by the operators of such nuclear installations. The AECB reports to Parliament through a designated Minister, currently the Minister of Energy, Mines and Resources

  15. Going Corporate

    CERN Document Server

    Kadre, Shailendra

    2011-01-01

    Going Corporate: A Geek's Guide shows technology workers how to gain the understanding and skills necessary for becoming an effective, promotable manager or sought-after consultant or freelancer. Technology professionals typically dive deeply into small pieces of technology - like lines of code or the design of a circuit. As a result, they may have trouble seeing the bigger picture and how their work supports an organization's goals. But ignoring or dismissing the business or operational aspects of projects and products can lead to career stagnation. In fact, understanding the larger business

  16. Corporate Foresight

    DEFF Research Database (Denmark)

    Rohrbeck, René; Gemünden, Hans Georg

    2011-01-01

    Although in the last three decades much knowledge has been produced on how best to conduct foresight exercises, but little is known on how foresight should be integrated with the innovation effort of a company. Drawing on empirical evidence from 19 case studies and 107 interviews, we identify three...... roles that corporate foresight should play to maximize the innovation capacity of a firm: (1) the strategist role, which explores new business fields; (2) the initiator role, which increases the number of innovation concepts and ideas; and (3) the opponent role, which challenges innovation projects...

  17. Corporate responsibility

    DEFF Research Database (Denmark)

    Jensen, Karsten Klint

    2007-01-01

    Is it legitimate for a business to concentrate on profits under respect for the law and ethical custom? On the one hand, there seems to be good reasons for claiming that a corporation has a duty to act for the benefit of all its stakeholders. On the other hand, this seems to dissolve the notion...... of a private business; but then again, a private business would appear to be exempted from ethical responsibility. This is what Kenneth Goodpaster has called the stakeholder paradox: either we have ethics without business or we have business without ethics. Through a different route, I reach the same solution...

  18. Corporate Entrepreneurship

    DEFF Research Database (Denmark)

    Lassen, Astrid Heidemann; Sørensen, Suna

    2006-01-01

    The recognition of the importance of entrepreneurial dynamics in corporate context is increasingly acknowledged in both entrepreneurship and strategic management literature, as firms today face a reality in which frame-breaking innovation is an important element of survival. From this understanding......, the concept of Strategic Entrepreneurship (SE) has arisen, arguing a logic of focusing on the intersections between the two fields. This paper sets out to explore the SE construct empirically. Through seven case studies evolving around radical technological innovations, evidence is found of the importance...

  19. Corporate Fictions

    DEFF Research Database (Denmark)

    Staunæs, Dorthe; Søndergaard, D. M.

    2006-01-01

    The article describes a particular strategy of communication called a social science fiction. The strategy was taken up following an empirical research project on gender and management, in order to communicate results to the company's managers and Human Resource Staff. The research results showed...... fiction was the kind of narrative therapy, which aims to reconfigure the problem in focus by a process of externalisation that allows a reconstruction and retelling of the issue. The article describes how three cultural mechanisms in the company were condensed into three imaginary figures: Mr. Corporate...

  20. 1. Biologic monitoring at Barsebaeck nuclear power plant 1985-1997. 2. Biological monitoring at Swedish nuclear power plants in 1998. Annual report 1998

    International Nuclear Information System (INIS)

    Andersson, Jan; Mo, K.; Thoernqvist, S.

    1999-06-01

    This report gives an account for two studies on the ecological effects of effluents to the aquatic environment from the Swedish nuclear power plants: 1. The results of biological monitoring at the Barsebaeck nuclear power plant during the period 1985-1997 are summarised. Comparisons are made with a previous report from 1969-1983. The fish community was studied by fyke net test fishing in the cooling water effluent area along a gradient out to unaffected sites. The loss of young eels in the cooling water intake was estimated annually. Damage on female grey mullet oocyte development was analysed on samples of cooling water exposed fish. 2. The biological monitoring at the Swedish nuclear power plants during 1998 was with minor exceptions performed according to the established programmes. The monitoring at Forsmark is running in the enclosed Biotest basin at the cooling water outlet and in the surrounding archipelago. Reference data are collected at Finbo, NW Aaland, and in the nearby Graesoe archipelago. In 1998 as in previous years the benthic macro fauna abundance within the Biotest basin showed strong variations. In the beginning of the year abundance and biomass were low, in the autumn though, higher than average. Oskarshamn: The monitoring is performed in the small effluent bay, Hamnefjaerden bay, in the waters surrounding the cooling water plume and in a reference area, Kvaedoe-fjaerden, 100 km north of the power plant. Perch and roach catches have been high in the Hamnefjaerden bay since the late 1980's. In 1998 catches of perch were on a higher level than in 1997, both in spring and in summer. The changes for roach were small. A moderate decrease in eel catches took place in 1997 and 1998, indicating a reduced effect of stockings in the late 1980's. Ringhals: The monitoring is performed in the area close to the cooling water outlet, which is located at an open coast, and in a reference area. An attraction of yellow eel to the effluent area has been

  1. The Corporate Social Responsibility Disclosure: A Study of Listed Companies in Bangladesh

    OpenAIRE

    Rouf, Md. Abdur

    2011-01-01

    This is an exploratory study designed to investigate the extant and nature of corporate social responsibility disclosure (CSRD) in corporate annual reports (CAR) of listed companies in Bangladesh. Specifically, the report examines the relationship between corporate attributes and firm-specific factors and corporate social responsibility disclosures. Data are taken from annual reports of 2007 of the listed companies of Dhaka Stock Exchanges. The study uses ordinary least squares regression mod...

  2. Atoms for Power, Health and the Environment. 31st annual conference of the Canadian Nuclear Society and 34th annual conference of the Canadian Nuclear Society and Canadian Nuclear Association

    International Nuclear Information System (INIS)

    2010-01-01

    The 31st Annual Conference of the CNS and 34th Annual Student Conference of the CNS and CNA was held in Montreal, Quebec, Canada on May 24-27, 2010. The theme of the conference, 'Atoms for Power, Health, and the Environment', brought together scientists, engineers, technologists and students interested in all aspects and applications of energy from the atom. The central objective of this conference was to provide a forum for exchange of views on how this technical enterprise can best serve the needs of humanity, now and in the future. There were over 400 attendees and more than 100 technical papers, as well as plenary sessions that addressed broad industrial and commercial developments in the field.

  3. Just the facts: 1999 annual report

    International Nuclear Information System (INIS)

    1999-01-01

    TransAlta is an international electric energy company with about $ 6 billion in assets, and a generation capacity of more than 8,000 megawatts. In addition to about 4,500 megawatts of coal-fired and hydroelectric generation in Alberta, the company is closing a 1,340 megawatt acquisition in the United States and has almost 2,200 megawatts of gas-fired power projects operating or in development in North America, Mexico and Australia. This annual report reviews progress made by the corporation during 1999. Notable among these achievements were the acquisition of the 1,340 megawatts power generating plant and coal mine in Washington State; disposing of the less profitable Alberta-based distribution and retail businesses, and businesses with unacceptable risk profile in New Zealand; new profitable power purchase arrangements which will preserve the value of Alberta-based generation assets in a more competitive market; and transition into Y2K with no interruptions in service to customers. The Corporation intends to continue building on its core strengths as a low-cost operator of generation and transmission assets. The short-term target (2002) is 10,000 megawatts, while the longer term goal (2005 to 2007) is to reach 15,000 megawatts of generating capacity, focusing on growth in Canada, the United States and Mexico, as well as Australia. In 1999 the Corporation provided a 10.1 per cent return on investment to shareholders; it expects to do as well in the year 2000 and beyond. A complete audited financial statement is incorporated into the annual report

  4. FINAL REPORT WIND POWER WARM SPRINGS RESERVATION TRIBAL LANDS DOE GRANT NUMBER DE-FG36-07GO17077 SUBMITTED BY WARM SPRINGS POWER & WATER ENTERPRISES A CORPORATE ENTITY OF THE CONFEDERATED TRIBES OF WARM SPRINGS WARM SPRINGS, OREGON

    Energy Technology Data Exchange (ETDEWEB)

    Jim Manion; Michael Lofting; Wil Sando; Emily Leslie; Randy Goff

    2009-03-30

    Wind Generation Feasibility Warm Springs Power and Water Enterprises (WSPWE) is a corporate entity owned by the Confederated Tribes of the Warm Springs Reservation, located in central Oregon. The organization is responsible for managing electrical power generation facilities on tribal lands and, as part of its charter, has the responsibility to evaluate and develop renewable energy resources for the Confederated Tribes of Warm Springs. WSPWE recently completed a multi-year-year wind resource assessment of tribal lands, beginning with the installation of wind monitoring towers on the Mutton Mountains site in 2003, and collection of on-site wind data is ongoing. The study identified the Mutton Mountain site on the northeastern edge of the reservation as a site with sufficient wind resources to support a commercial power project estimated to generate over 226,000 MWh per year. Initial estimates indicate that the first phase of the project would be approximately 79.5 MW of installed capacity. This Phase 2 study expands and builds on the previously conducted Phase 1 Wind Resource Assessment, dated June 30, 2007. In order to fully assess the economic benefits that may accrue to the Tribes through wind energy development at Mutton Mountain, a planning-level opinion of probable cost was performed to define the costs associated with key design and construction aspects of the proposed project. This report defines the Mutton Mountain project costs and economics in sufficient detail to allow the Tribes to either build the project themselves or contract with a developer under the most favorable terms possible for the Tribes.

  5. Long-term benthic monitoring programs near the Morgantown and Calvert Cliffs power plants - third annual report. Volume 1. Text. Annual report, July 1982-June 1983

    International Nuclear Information System (INIS)

    Holland, A.F.; Hiegel, M.H.; Shaughnessy, A.T.; Stroup, C.F.; Ross, E.A.

    1985-01-01

    Macrobenthos and physical/chemical factors known to affect their abundance were monitored near the Calvert Cliffs nuclear power plant on the mainstem of the Chesapeake Bay between 1971 and 1982. These data, along with data collected near the Morgantown power plant on the Potomac between 1980 and 1983, were used to quantify the variation in macrobenthos due to natural spatial patterns, seasonal dynamics, year-to-year fluctuations in abundance, and power plant operations, as well as to determine if long-term trends in populations or communities occurred. Macrobenthic community structure was persistent over the 11 years within bounds determined chiefly by year-to-year variation in salinity and dissolved oxygen concentration. Most of the species responded to changes in salinity by predictable increases or decreases in abundance

  6. Long-term benthic monitoring programs near the Morgantown and Calvert Cliffs power plants - third annual report. Volume 2. Appendices. Annual report, July 1982-June 1983

    International Nuclear Information System (INIS)

    Holland, A.F.; Hiegel, M.H.; Shaughnessy, A.T.; Stroup, C.F.; Ross, E.A.

    1985-01-01

    Macrobenthos and physical/chemical factors known to affect their abundance were monitored near the Calvert Cliffs nuclear power plant on the mainstem of the Chesapeake Bay between 1971 and 1982. These data, along with data collected near the Morgantown power plant on the Potomac between 1980 and 1983, were used to quantify the variation in macrobenthos due to natural spatial patterns, seasonal dynamics, year-to-year fluctuations in abundance, and power plant operations, as well as to determine if long-term trends in populations or communities occurred. Macrobenthic community structure was persistent over the 11 years within bounds determined chiefly by year-to-year variation in salinity and dissolved oxygen concentration. Most of the species responded to changes in salinity by predictable increases or decreases in abundance

  7. PHA Corporate Strategy 2011-2015

    OpenAIRE

    Public Health Agency

    2011-01-01

    The PHA Corporate Strategy has been developed with input from staff across the PHA and taking account of feedback from external stakeholders.� It is a high level document, setting out the direction for the PHA over the next few years, and will be supported by the annual PHA Corporate Business Plan, Directorate Business Plans and the Joint Commissioning Plan.� The Strategy was approved by the PHA board at the November 2011 board meeting.�The PHA Corporate strategy sets out the role, direction ...

  8. Evolution of Corporate Essence

    DEFF Research Database (Denmark)

    Fomcenco, Alex

    2016-01-01

    that applies to a traditional limited liability company. Its main distinctive attributes are corporate purpose, accountability of its management, and transparency requirements. Although, a Public Benefit Corporation does not impose any revolutionary amendments to the way the traditional corporations are......, it offers a legal framework where public benefit is more important than profits. As a corporate entity, Public Benefit Corporation already exists in numerous jurisdictions and those jurisdictions that do not yet facilitate creation of this corporate form should most definitely consider it....

  9. Managing Corporate Reputation Through Corporate Branding

    DEFF Research Database (Denmark)

    Schultz, Majken; Hatch, Mary Jo; Adams, Nick

    2012-01-01

    This article, which concentrates on symbolic management by explaining the role of corporate branding in managing corporate reputation, using Novo Nordisk as a case study, presents three perspectives on corporate branding: the marketing perspective, the organisational perspective and the co...... is a way to influence corporate reputation. The Novo Nordisk management believes the data indicate that corporate branding influenced reputation more than the other way around. Formal brand management practices may work considerably better when they complement rather than try to control existing forces......-creation perspective. The three perspectives reviewed show the possibility of developing a multidisciplinary conceptualisation of corporate branding. They all offer insights important to managing organisations as corporate brands in a multi-stakeholder context and thus to the likelihood that corporate branding...

  10. TOTAL annual report 2003

    International Nuclear Information System (INIS)

    2004-01-01

    This 2003 annual report of the Group Total provides economical results and information of the society on the following topics: keys data, the corporate governance (Directors charter, board of directors, audit committee, nomination and remuneration committee, internal control procedures, compensation of directors and executive officers), the corporate social responsibility (environmental stewardship, the future of energy management, the safety enhancement, the human resources, ethics and local development), the investor relations, the management report, the upstream exploration and production, the downstream refining, marketing, trading and shipping, the chemicals and financial and legal information. (A.L.B.)

  11. The Nordic Corporate Governance Model

    DEFF Research Database (Denmark)

    Thomsen, Steen

    2016-01-01

    , concentrated ownership, semi two-tier board structures, employee representation and low-powered managerial incentives – has been shaped by the welfare state in ways consistent with systemic corporate governance theories. The article concludes with a skeptical discussion of the Nordic model as a development...

  12. Compliance management and corporate governance; Compliance Management und Corporate Governance

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Uwe [Stadt Frankfurt am Main (Germany); Alsheimer, Constantin; Kassebohm, Kristian; Reutler, Susanne [Mainova AG, Frankfurt (Germany)

    2009-08-15

    Starting in the year 2009, numerous changes in the financial system and accountancy a well as in the corporate law come into effect for enterprises. Thereby, the requirements substantially are intensified to their corporate governance. The actual well-known reproaches of bribery, corruption and injuries of data protection intensify the pressure on executive committees and supervisory boards in order to meet normative and ethical requirements. All the more is valid for power suppliers whose reputation can already carry damage out with the first suspicion. Already in 2008, Mainova AG (Frnkfurt/Main, Federal Republic of Germany) implemented a compliance management.

  13. 2008 annual nuclear technology conference: opting out of the use of nuclear power. German special approach leads into a dead end of energy policy. Conference report

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    The President of the Deutsches Atomforum, Dr. Walter Hohlefelder, emphasized in his opening address at the 2008 Annual Nuclear Technology Conference in Hamburg that the German special approach to nuclear power utilization led straight into a dead end of energy policy. ''The outcome is foreseeable: The ambitious German goals of carbon dioxide reduction are missed, the competitiveness of the country is jeopardized, dependency on foreign energy imports rises,'' Dr. Hohlefelder stated. In view of the growing challenges in energy policy Germany had no alternative but to reassess nuclear power. The only outcome of this reappraisal could be extension of the life of nuclear power plants currently in operation. This was necessary also in order to avoid an impending gap in German electricity supply, Dr. Hohlefelder added. He invited all stakeholders to join in an open, unbiased dialog. Dr. Hohlefelder openly criticized the continued ban on research into the development of new reactors. ''A policy of this kind, a policy which bans thinking, is unacceptable in a technology-oriented, industrialized nation such as Germany.'' Nuclear power technology as a high-tech area was a unique achievement which had contributed to the prosperity of the country. The Annual Nuclear Technology Conference, which was held for the 39th time this year, is one of the biggest specialized conferences in the nuclear field with an attendance, this year, of approximately 1300 participants from more than twenty nations. (orig.)

  14. 77 FR 3585 - Airworthiness Directives; Cirrus Design Corporation Airplanes

    Science.gov (United States)

    2012-01-25

    ... Airworthiness Directives; Cirrus Design Corporation Airplanes AGENCY: Federal Aviation Administration (FAA), DOT... Corporation (Cirrus) Model SR22T airplanes. This AD was prompted by reports of partial loss of engine power.... ADDRESSES: For service information identified in this AD, contact Cirrus Design Corporation, 4515 Taylor...

  15. Annual report of operation management in nuclear power stations, fiscal year 1985. Showa 60 nendo genshiryoku hatsudensho unten kanri nenpo

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Twenty years have elapsed since the first practical nuclear reactor in Japan started the operation. In the generated power in fiscal year 1985, that of nuclear power stations for the first time overtook that of thermal power stations, and now the age of nuclear power as the main and oil power as the subordinate has begun. As of the end of fiscal year 1985, there were 32 nuclear power plants in operation, having total output capacity of 24.521 million kW. In fiscal year 1985, nuclear power plants generated about 159 billion kWh, which is about 2 % of electric power supply. As to the capacity factor, 76% was attained in fiscal year 1985, and this is ranked in the top group of LWR-operating countries in the world. It showed that the Japanese technology of nuclear power generation is at the top level in the world. However, in order to increase nuclear power generation and to accomplish the role of main electric power source hereafter, it is necessary to further increase the reliability and economical efficiency. The list of nuclear power stations in Japan, the state of operation of nuclear power stations, the state of accidents and troubles, the state of regular inspection, the management of radioactive wastes and the radiation exposure of workers in nuclear power stations, the operational management and others are reported.

  16. Essentially stronger -1999 EPCOR annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This annual report provides details of the financial operations of EPCOR, the newly formed utility, combining together three essential elements of modern living --electric power, water and natural gas-- as a single entity. In addition to this report on financial management, there are two companion reports on environmental performance entitled {sup E}ssential Balance', and on contributions to the community with the title of 'Essential Spirit'. While this report focuses on the Corporation's financial performance, it also provides a summary on the Corporation's growth, operational excellence, regulatory matters, environmental achievements and management of the Corporation's people resources. The financial report includes the customary consolidated financial statements, the auditor's report, and management's discussion and analysis of the financial report. Revenues for 1999 totalled just over one billion dollars ($978 million in 1998); net income was $116 million ($121 million in 1998); operating expenses were higher than in 1998 ($765 million versus $642 million) due to higher natural gas prices; capital spending was $198 million, compared to $153 million in 1998. Operations, maintenance, and administrative costs were also higher in 1999 due to higher employee costs across the EPCOR Group, one-time costs associated with EPCOR's master branding initiative, Y2K testing and remediation, and increased business development costs.

  17. Essentially stronger -1999 EPCOR annual report

    International Nuclear Information System (INIS)

    2000-01-01

    This annual report provides details of the financial operations of EPCOR, the newly formed utility, combining together three essential elements of modern living --electric power, water and natural gas-- as a single entity. In addition to this report on financial management, there are two companion reports on environmental performance entitled E ssential Balance', and on contributions to the community with the title of 'Essential Spirit'. While this report focuses on the Corporation's financial performance, it also provides a summary on the Corporation's growth, operational excellence, regulatory matters, environmental achievements and management of the Corporation's people resources. The financial report includes the customary consolidated financial statements, the auditor's report, and management's discussion and analysis of the financial report. Revenues for 1999 totalled just over one billion dollars ($978 million in 1998); net income was $116 million ($121 million in 1998); operating expenses were higher than in 1998 ($765 million versus $642 million) due to higher natural gas prices; capital spending was $198 million, compared to $153 million in 1998. Operations, maintenance, and administrative costs were also higher in 1999 due to higher employee costs across the EPCOR Group, one-time costs associated with EPCOR's master branding initiative, Y2K testing and remediation, and increased business development costs

  18. 2002 annual report EDF group

    International Nuclear Information System (INIS)

    2002-01-01

    This document is the 2002 annual report of Electricite de France (EdF) group, the French electric utility. Content: Introductory section (EDF at a glance, Chairman's message, 2002 Highlights); Corporate governance and Group strategy (Corporate governance, sustainable growth strategy, EDF branches); Financial performance (Reaching critical mass, Margins holding up well, Balance sheet); Human resources (Launching Group-wide synergies, Optimising human resources); Customers (Major customers, SMEs and professional customers, Local authorities, Residential customers, Ensuring quality access to electricity); Generation (A balanced energy mix, Nuclear generation, Fossil-fuelled generation, Renewable energies); Corporate social responsibility (Global and local partnerships, Promoting community development)

  19. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: 1 January--31 December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    The three reactors operated at near full power generating 17,622,500 MWH gross electrical power. There were 153 major power reductions including 50 scrams mostly caused by equipment failures. Data are presented concerning operations, modifications, occupational exposures, effluent activity, and waste disposal

  20. Transnational politics and translocal governance: The politics of corporate responsibility

    OpenAIRE

    Banerjee, S. B.

    2017-01-01

    In this article, I provide a critical analysis of the politics of corporate social responsibility. I argue that corporate social responsibility is a strategy that enables multinational corporations to exercise power in the global political economy. Using the global extractive industries as a context, I focus on conflicts between communities, the state and multinational corporations that arise owing to the negative social and environmental impacts of mining and extraction. In particular, I ana...

  1. Pluri-annual planning of power generation investments. 2005-2015 era; Programmation pluriannuelle des investissements de production electrique. Periode 2005-2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The pluri-annual planning of power generation investments (PPI) is provided by article 6 of the law from February 10, 2000 relative to the modernization and development of the electric utility. The PPI is the concrete translation of the energy policy and aims to identify the necessary investments with respect to the security of power supplies and beyond the already known commitments. In the framework of market deregulation and respect of competition, the PPI is limited to the identification of such investments but not to their realization. This document, which corresponds to the 2005 exercise, is the second report to the Parliament. It stresses on the following points: the mastery of power demand and the demand scenarios, the level of accepted risk, the carrying out of the development of renewable energy sources (5 GW by 2010 and 12.5 GW by 2016 for wind power, and 6 TWh more for biomass by 2016), the start-up of an EPR reactor in 2012, the investment needs for classical thermal power plants (+2.6 GW of diesel fuel power plants and +500 MW of combustion turbines as decided by EdF), the development of production means in 2 regions with specific needs: Provence-Alpes-Cote d'Azur and Bretagne (Brittany), and also in insular areas (Corsica and overseas territories), and the reflexions to carry on in continuation of the PPI. (J.S.)

  2. Designing low-carbon power systems for Great Britain in 2050 that are robust to the spatiotemporal and inter-annual variability of weather

    Science.gov (United States)

    Zeyringer, Marianne; Price, James; Fais, Birgit; Li, Pei-Hao; Sharp, Ed

    2018-05-01

    The design of cost-effective power systems with high shares of variable renewable energy (VRE) technologies requires a modelling approach that simultaneously represents the whole energy system combined with the spatiotemporal and inter-annual variability of VRE. Here, we soft-link a long-term energy system model, which explores new energy system configurations from years to decades, with a high spatial and temporal resolution power system model that captures VRE variability from hours to years. Applying this methodology to Great Britain for 2050, we find that VRE-focused power system design is highly sensitive to the inter-annual variability of weather and that planning based on a single year can lead to operational inadequacy and failure to meet long-term decarbonization objectives. However, some insights do emerge that are relatively stable to weather-year. Reinforcement of the transmission system consistently leads to a decrease in system costs while electricity storage and flexible generation, needed to integrate VRE into the system, are generally deployed close to demand centres.

  3. Corporate Social Responsibility and Shareholder Proposals

    NARCIS (Netherlands)

    Eding, Erwin; Scholtens, Bert

    2017-01-01

    We study how corporate social responsibility relates to investors, firms, and shareholder proposals. We examine shareholder proposals on environmental, social, and governance issues at the annual general meeting of shareholders with US Fortune 250 firms during 2011-2014. We find that the probability

  4. Corporate Social Responsibility and Shareholder Proposals

    NARCIS (Netherlands)

    Eding, Erwin; Scholtens, Bert

    We study how corporate social responsibility relates to investors, firms, and shareholder proposals. We examine shareholder proposals on environmental, social, and governance issues at the annual general meeting of shareholders with US Fortune 250 firms during 2011-2014. We find that the probability

  5. CSIR Annual report 2003

    CSIR Research Space (South Africa)

    CSIR

    2003-01-01

    Full Text Available ACHIEVEMENTS OF OUR PEOPLE 14 THE STATE OF SCIENCE AND TECHNOLOGY IN THE CSIR 15 ANNUAL FINANCIAL STATEMENTS 20 CORPORATE GOVERNANCE 20 CSIR BOARD MEMBERS 24 REPORT OF THE AUDIT COMMITTEE 26 REPORT OF THE AUDITOR GENERAL 27 EXECUTIVE REPORT 28 FIVE..., which followed research and development of new technology related to the Hoodia plant, dubbed P57. Clinical trials relating to the product continue internationally. World-class genomics research > The African Centre for Gene Technologies, established...

  6. Taxing the powerful, the rise of populism and the crisis in Europe: the case for the EU Common Consolidated Corporate Tax Base

    OpenAIRE

    Morgan, JA

    2017-01-01

    Contemporary populism is rooted in a crisis of legitimacy. Corporate taxavoidance by multinationals is one cause of that crisi s. Although states tend to beincreasingly formally committed to tackling avoidance, they do so in a system thatpromotes contradictory sets of behaviour. This tends to undermine attempts to solvethe problem of avoidance unless a more transformative collective approach is taken.Ironically, despite its own democratic deficit, the European Comm ission has taken aleading ro...

  7. Corporate Bonds in Denmark

    DEFF Research Database (Denmark)

    Tell, Michael

    2015-01-01

    Corporate financing is the choice between capital generated by the corporation and capital from external investors. However, since the financial crisis shook the markets in 2007–2008, financing opportunities through the classical means of financing have decreased. As a result, corporations have...... to think in alternative ways such as issuing corporate bonds. A market for corporate bonds exists in countries such as Norway, Germany, France, the United Kingdom and the United States, while Denmark is still behind in this trend. Some large Danish corporations have instead used foreign corporate bonds...... markets. However, NASDAQ OMX has introduced the First North Bond Market in December 2012 and new regulatory framework came into place in 2014, which may contribute to a Danish based corporate bond market. The purpose of this article is to present the regulatory changes in Denmark in relation to corporate...

  8. Assessing the Impact of the National Cultural Framework on Responsible Corporate Behaviour towards Consumers: an Application of Geert Hofstede`s Cultural Model

    Directory of Open Access Journals (Sweden)

    Cristina Gănescu

    2014-02-01

    Full Text Available This article aims to define and measure responsible corporate behaviour towards consumers in EU countries by defining an index of responsible corporate behaviour towards consumers and to establish the impact of Geert Hofstede's cultural dimensions on the responsible behaviour of organisations towards consumers. The index uses a specific measurement methodology based on three major components of responsible corporate behaviour towards customers and on content analysis of the Eurostat databases, the RAPEX 2012 Annual Report, the 2012-2013 Global Competitiveness Report and the Global Reporting Initiative database. We used the multifactorial regression and the Wald significance test to demonstrate that organisations operating in countries characterised by low power distance, individualism, femininity, tolerance of unknown and long-term orientation pay more attention to responsible corporate behaviour towards customers. The study highlights theoretical considerations that support the influence of the national cultural framework on responsible corporate behaviour towards consumers. The methodology for calculating the index of responsible corporate behaviour towards consumers can become a basis of analysis of responsible corporate behaviour towards local consumers or other stakeholders.

  9. Corporal Punishment in U.S. Public Schools: A Continuing Challenge for School Social Workers

    Science.gov (United States)

    Dupper, David R.; Montgomery Dingus, Amy E.

    2008-01-01

    Although corporal punishment has been banned in 29 states, more than a million cases of corporal punishment in U.S. schools continue to be reported annually, with states located in the southeastern and southwestern United States accounting for the vast majority of instances of corporal punishment. This article provides an overview of corporal…

  10. Occupational radiation exposure at commercial nuclear power reactors and other facilities 1995: Twenty-eighth annual report. Volume 17

    International Nuclear Information System (INIS)

    Thomas, M.L.

    1997-01-01

    This report summarizes the occupational exposure data that are maintained in the US Nuclear Regulatory Commission's (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 1995 annual reports submitted by six of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Since there are no geologic repositories for high-level waste currently licensed, only six categories will be considered in this report. In 1995, the annual collective dose per reactor for light water reactor licensees (LWRs) was 199 person-cSv (person-rem). This is the same value that was reported for 1994. The annual collective dose per reactor for boiling water reactors (BWRs) was 256 person-cSv (person-rem) and, for pressurized water reactors (PWRs), it was 170 person-cSv (person-rem). Analyses of transient worker data indicate that 17,153 individuals completed work assignments at two or more licensees during the monitoring year. The dose distributions are adjusted each year to account for the duplicate reporting of transient workers by multiple licensees. In 1995, the average measurable dose calculated from reported data was 0.26 cSv (rem). The corrected dose distribution resulted in an average measurable dose of 0.32 cSv (rem)

  11. Product market competition and corporate governance

    Directory of Open Access Journals (Sweden)

    Julia Chou

    2011-04-01

    Full Text Available This paper investigates whether product market competition acts as an external mechanism for disciplining management and also whether there is any relationship between the degree of competition a firm faces and its corporate governance. We find that firms in competitive industries or with low market power tend to have weak corporate governance structures. Results are robust to various competition measures at firm and industry levels, even after controlling for firm-specific variables. We further find that corporate governance quality has a significant effect on performance only when product market competition is weak. The overall evidence suggests that product market competition has a substantial impact on corporate governance and that it substitutes for corporate governance quality. Finally, we provide evidence that the disciplinary force of competition on management is from the fear of liquidation.

  12. Assessment of the Annual Additional Effective Doses amongst Minamisoma Children during the Second Year after the Fukushima Daiichi Nuclear Power Plant Disaster.

    Science.gov (United States)

    Tsubokura, Masaharu; Kato, Shigeaki; Morita, Tomohiro; Nomura, Shuhei; Kami, Masahiro; Sakaihara, Kikugoro; Hanai, Tatsuo; Oikawa, Tomoyoshi; Kanazawa, Yukio

    2015-01-01

    An assessment of the external and internal radiation exposure levels, which includes calculation of effective doses from chronic radiation exposure and assessment of long-term radiation-related health risks, has become mandatory for residents living near the nuclear power plant in Fukushima, Japan. Data for all primary and secondary children in Minamisoma who participated in both external and internal screening programs were employed to assess the annual additional effective dose acquired due to the Fukushima Daiichi nuclear power plant disaster. In total, 881 children took part in both internal and external radiation exposure screening programs between 1st April 2012 to 31st March 2013. The level of additional effective doses ranged from 0.025 to 3.49 mSv/year with the median of 0.70 mSv/year. While 99.7% of the children (n = 878) were not detected with internal contamination, 90.3% of the additional effective doses was the result of external radiation exposure. This finding is relatively consistent with the doses estimated by the United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR). The present study showed that the level of annual additional effective doses among children in Minamisoma has been low, even after the inter-individual differences were taken into account. The dose from internal radiation exposure was negligible presumably due to the success of contaminated food control.

  13. Proceedings of the APPrO 2006 18. annual Canadian power conference and trade show : Green Power Conference : Canada's leading renewable energy conference

    International Nuclear Information System (INIS)

    Brooks, J.

    2007-01-01

    This conference provided a forum for members of the Association of Power Producers of Ontario to discuss recent developments in renewable energy and the electric power industry. An overview of Ontario's renewable standard offer program was provided. Members of the conference also discussed case studies of Ontario renewable energy projects including micro-hydro; anaerobic digesters; stand-alone wind power; and solar energy. The economics of wind power were discussed, and current capital costs for renewable energy technology projects were reviewed. Other topics included the use of base-load nuclear and hydro-electricity; the closing down of coal-fired generation; the integration of wind power; and natural gas and cogeneration. Issues related to interconnected power supplies were also reviewed. Discussions were divided into 5 topics : (1) an introduction to the standard offer program; (2) provincial procurement of green power; (3) case studies of stand-alone project; (4) distributed generation and the standard offer process; and distribution approval and connection issues. refs., tabs., figs

  14. Report to the parliament. Pluri-annual planning of power production investments; Rapport au parlement. Programmation pluriannuelle des investissements de production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    The article 6 of the law from February 10, 2000, relative to the modernization and development of the electric utility, schedules a pluri-annual planning of the production investments (PPI) which represents a concrete translation of the energy policy in the domain of electricity. The PPI will allow to reach the energy policy goals using a balanced development of the national production means in terms of primary energy sources, techniques of production and geographical distribution of investments. This document is the first PPI report to the parliament. It is based on the scheme of energy collective services and on a provisional status made by the manager of the transportation network (RTE). In 2010, renewable energies should cover 21% of the French electricity needs. This ratio will be reached mainly thanks to the development of wind power (7000 to 14000 MW of installed power, which represents 20 to 35 TWh of additional production). Hydro-power should be increased of 8 TWh max, depending on the public policies implemented, and biomass will have a significant contribution too. On the other hand, actions of mastery of the electricity demand will have to be implemented. From 2008 onward, the decommissioning of several power plants will impose to find new solutions to satisfy the peak power needs. The covering of consumption peaks requires a correlation study of the power peaks at the European scale. Finally, the situation of non-interconnected areas and of areas with fragile supply has been carefully considered. The creation of new power production means must be envisaged in most of these areas. (J.S.)

  15. RTE - annual report 2006

    International Nuclear Information System (INIS)

    2006-01-01

    RTE is the French electricity transmission system operator responsible for operation, maintenance and development, With a system which is the largest in Europe - 100,000 kilometres of high voltage and extra-high voltage circuits and 46 cross-border interconnections, plus a key location at the geographical hub - RTE is playing a key role in the development of the European electricity market. RTE is a public service company guaranteeing the efficient operation and reliability of the French power system, and providing equitable access to all system users. The company is part of the EDF Group, but has totally independent management and administration, as required by law. In 2005, RTE became a limited liability company with an Executive Board and Supervisory Board; this corporate status guarantees due neutrality in providing service to all players on the electricity market. RTE is the Number 1 electricity transmission system in Europe with 8,300 employees and 4 billion euros turnover. This activity report presents: 1 - Background: The RTE Transmission System, Message from the Chairman of the Executive Board; 2 - A High Performance Public Service Company at the Hub of the European Electricity Market: 2006 overview and Highlights, RTE Governance and Organisation; 3 - A Year with Many Developments: Satisfied Customers on a More Efficient Market, Reliable, Upgraded Industrial Facilities, A Commitment to Environmentally Friendly Public Service, New Foundations for Human Resources Policy, International Business on the Move, A Good Improvement in Financial Performance; 4 - Glossary; 5 - Management Report: Financial and Legal Information (Highlights in 2006, Market Trends, Business and Results for 2006, Capital, Financial Structure, Prospects for 2007, Other Financial and Legal Information), Information on the Environment (Environment Policy - Review, Respect for Natural Environments and Landscapes, Consultation and Consideration, Research, Continuing Improvement, Environmental

  16. Waste-Heat-to-Power Market in the U.S., Heat is Power Annual Meeting (Presentation) – August 15, 2012

    Science.gov (United States)

    This presentation provides information about the EPA CHP Partnership, including an overview of the Partnership's tools and resources, and policy support. The presentation also describes the potential of Waste Heat to Power (WHP) systems.

  17. PVMaT - OMNION Series 3000: Photovoltaic Power Conversion System for Utility Interconnected Application; Annual Report, May 1997 - February 1999

    Energy Technology Data Exchange (ETDEWEB)

    Porter, D.

    2000-09-13

    This report details the work performed which was geared towards making advancements in three major areas (cost, reliability and performance) of three-phase, utility interconnected and photovoltaic power conversion.

  18. The Community's research and development programme on decommissioning of nuclear power plants. Fourth annual progress report (year 1983)

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    This is the fourth progress report of the European Community's program. (1979-83) of research on decommissioning of nuclear power plants. It covers the year 1983 and follows the 1980, 1981 and 1982 reports (EUR 7440, EUR 8343, EUR 8962). The present report describes the further progress of research and contains a large amount of results. For a majority of the 51 research contracts composing the 1979-83 programme, work was completed by the end of 1983; the conclusions drawn from this work are in this report. The European Community's program deals with the following fields: long-term integrity of buildings and systems; decontamination for decommissioning purposes; dismantling techniques; treatment of specific wastes materials (steel, concrete and graphite); large transport containers for radioactive waste produced in the dismantling of nuclear power plants; estimation of the quantities of radioactive waste arising from the decommissioning of nuclear power plants in the Community; influence of nuclear power plant design features on decommissioning

  19. Transparency, corporate governance and firm performance in The Netherlands

    NARCIS (Netherlands)

    van Beusichem, Herman Clasinus; de Jong, Abe; DeJong, Douglas; Mertens, Gerard

    2016-01-01

    We explore the relations between transparency, corporate governance, and performance for Dutch exchange-listed firms over 1997-2007. Our measure for transparency is based on annual report information. In 2005 a new accounting standard (IFRS) became mandatory and applicable to the annual reports of

  20. FY 1998 annual report on power generation by waste heat from cement production in China; Chugoku ni okeru cement hainetsu hatsuden 1998 nendo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project is to implement a feasibility study for applying waste heat power generation, which have been already commercialized in Japan and producing remarkable results, to China's cement plants producing 3,500 t/d or more of clinker, and thereby to try to establish a link with the Japan's clean development mechanism. It is expected that introduction of these systems improves energy use efficiency and environments in China. The study results indicate that the project for a Tongling Conch plant could generate power of 15,000 kW, reducing CO2 emissions by 89,178 t/y and cumulatively 1,783,560 tons in the 20-year period. The results also indicate that the project will be highly profitable, with an estimated internal return rate of as high as 33.78%. The project for a Huaxin plant could generate power of 8,400 kW, reducing CO2 emissions by 48,412 t/y and cumulatively 968,240 tons in the 20-year period, annually saving power charges by 325 million yen and bringing an internal return rate of 10.72%. (NEDO)

  1. Information and Corporate Cultures.

    Science.gov (United States)

    Drake, Miriam A.

    1984-01-01

    This paper defines "corporate culture" (set of values and beliefs shared by people working in an organization which represents employees' collective judgments about future) and discusses importance of corporate culture, nature of corporate cultures in business and academia, and role of information in shaping present and future corporate…

  2. Ontario Hydro annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1987-04-01

    Ontario Hydro`s annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics.

  3. Ontario Hydro annual report 1986

    International Nuclear Information System (INIS)

    1987-04-01

    Ontario Hydro's annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics

  4. Directorios cruzados: un estudio sobre la cúpula empresarial en la Argentina actual Interlocking directorates: a study of corporate power in today's Argentina

    Directory of Open Access Journals (Sweden)

    Diego Paredes

    2011-06-01

    Full Text Available El objetivo de este artículo es analizar, a través del método de los directorios cruzados, las redes que se establecen entre algunas de las corporaciones de mayores ventas en Argentina. Los estudios que se centran en el análisis de las grandes empresas en su mayoría se basan en indicadores económicos, como es el caso del las investigaciones acerca de la concentración de la riqueza. En el presente trabajo, a través del concepto de redes sociales, nos concentramos en las relaciones sociales que se establecen entre las grandes empresas en nuestro país. Observamos que el conjunto de las empresas estudiadas representa un sector altamente interconectado; además, a partir del análisis de redes, aportamos evidencia que apoya los postulados de la teoría de la dependencia de recursos así como también, de la teoría del control financiero: las interconexiones entre las empresas responden al tipo de recursos que las mismas controlan, destacándose el rol de los recursos financieros sobre otro tipo de recursos. Las empresas fueron seleccionadas por medio del ranking de empresas publicado por la revista Mercado para el año 2005, además hemos agregado a la muestra algunos de los bancos más importantes que operan hoy en Argentina así como también otras cuatro entidades de suma relevancia dentro del sistema económico, con el propósito de conocer la relación de estas entidades con el resto de las empresas.The aim of this article is to analyze, through the interlocking directorates method, the networks that are established between some of the highest revenues corporations in Argentina. Most of the research studies focused on the analysis of large corporations are based on economic indicators, such as studies on concentration of wealth. In the present case, through the concept of social networks, we focus on the social relations that are developed among big corporations in our country. We observe that the corporations studied represent a

  5. 45 CFR 1620.5 - Annual review.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Annual review. 1620.5 Section 1620.5 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION PRIORITIES IN USE OF RESOURCES § 1620.5 Annual review. (a) Priorities shall be set periodically and shall be reviewed by the...

  6. 77 FR 3166 - Annual Stress Test

    Science.gov (United States)

    2012-01-23

    ... FEDERAL DEPOSIT INSURANCE CORPORATION 12 CFR Part 325, Subpart C RIN 3064-AD91 Annual Stress Test... Reform and Consumer Protection Act (the ``Dodd-Frank Act'') regarding stress tests (``proposed rule... to conduct annual stress tests in accordance with the proposed rule, report the results of such...

  7. WhalePower tubercle blade power performance test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-15

    Toronto-based WhalePower Corporation has developed turbine blades that are modeled after humpback whale flippers. The blades, which incorporate tubercles along the leading edge of the blade, have been fitted to a Wenvor 25 kW turbine installed in North Cape, Prince Edward Island at a test site for the Wind Energy Institute of Canada (WEICan). A test was conducted to characterize the power performance of the prototype wind turbine. This report described the wind turbine configuration with particular reference to turbine information, power rating, blade information, tower information, control systems and grid connections. The test site was also described along with test equipment and measurement procedures. Information regarding power output as a function of wind speed was included along with power curves, power coefficient and annual energy production. The results for the power curve and annual energy production contain a level of uncertainty. While measurements for this test were collected and analyzed in accordance with International Electrotechnical Commission (IEC) standards for performance measurements of electricity producing wind turbines (IEC 61400-12-1), the comparative performance data between the prototype WhalePower wind turbine blade and the Wenvor standard blade was not gathered to IEC data standards. Deviations from IEC-61400-12-1 procedures were listed. 6 tabs., 16 figs., 3 appendices.

  8. Proceedings of APPrO 2005, the 17. annual Canadian power conference and trade show : making the pieces fit

    International Nuclear Information System (INIS)

    Brooks, J.

    2006-01-01

    The Canadian power conference and trade show is one of the leading conferences in the Ontario electricity sector. It examines how Ontario plans to build or replace power capacity following a path for new generation, based on both renewable and conventional sources. The current implementation of new generation and prospects for future expansion were discussed along with supply and demand issues. Topics of discussion focused on the Ontario electricity market and what is perceived by industry representatives to be the elements that need to be improved. The best structure for the industry and the degree of government involvement to meet future demand was discussed. The green power conference, which was run concurrently with this event, focused on renewable energy sources and zero greenhouse gas emission technologies. Eight sessions from the conference were indexed separately for inclusion in this database. tabs., figs

  9. Nuclear power and the global challenges of energy security, 6 September 2007, London, England, World Nuclear Association Annual Symposium

    International Nuclear Information System (INIS)

    ElBaradei, M.

    2007-01-01

    In the Atoms for Peace speech given by US President Eisenhower in 1953 - the speech that paved the way for the creation of the IAEA - he declared that a special purpose of Atoms for Peace would be 'to provide abundant electrical energy in the power-starved areas of the world'. That vision has yet to be realized. And it should not be taken to mean that nuclear power is the solution for all countries, or for all developing countries. But I would reiterate what I said at the outset - that the global challenges of security and development are interlinked, and that addressing the energy security needs of all countries will be a key to progress on both fronts. It is incumbent upon us to see to it that nuclear power will fulfil its potential in addressing these challenges

  10. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Units 1 and 2 were down for the first half of the year caused by the fire of March 1975. Net electrical power generated by Unit 1 this year was 1,301,183 MWH with the generator on line 2,175.25 hrs. Unit 2 generated 1,567,170 MWH with the generator on line 2,548.73 hrs. Unit 3 began full power operation on November 20th and generated 1,416,891 MWH with the generator on line 2,058.20 hrs. Information is presented concerning operations, fuel performance, surveillance testing, containment leak testing, changes, power generation, shutdown and forced reductions, coolant chemistry, occupational radiation exposures, and maintenance

  11. Thermal Power Systems, Point-Focusing Distributed Receiver Technology Project. Annual technical report, Fiscal Year 1978. Volume II. Detailed report

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-15

    Thermal or electrical power from the sun's radiated energy through Point-Focusing Distributed Receiver technology is the goal of this Project. The energy thus produced must be economically competitive with other sources. This Project supports the industrial development of technology and hardware for extracting energy from solar power to achieve the stated goal. Present studies are working to concentrate the solar energy through mirrors or lenses, to a working fluid or gas, and through a power converter change it to an energy source useful to man. Rankine-cycle and Brayton-cycle engines are currently being developed as the most promising energy converters for our near future needs. Accomplishments on point-focusing technology in FY 1978 are detailed.

  12. Spatial models for probabilistic prediction of wind power with application to annual-average and high temporal resolution data

    DEFF Research Database (Denmark)

    Lenzi, Amanda; Pinson, Pierre; Clemmensen, Line Katrine Harder

    2017-01-01

    average wind power generation, and for a high temporal resolution (typically wind power averages over 15-min time steps). In both cases, we use a spatial hierarchical statistical model in which spatial correlation is captured by a latent Gaussian field. We explore how such models can be handled...... with stochastic partial differential approximations of Matérn Gaussian fields together with Integrated Nested Laplace Approximations. We demonstrate the proposed methods on wind farm data from Western Denmark, and compare the results to those obtained with standard geostatistical methods. The results show...

  13. Central receiver solar thermal power system, Phase 1. Annual progress report (final) for period ending September 30, 1976

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-02-01

    The program activities since the beginning of the program in July of 1975 through September of 1976 are summarized. The primary efforts during the first portion of this period were the preparation of the Pilot Plant Preliminary Design Baseline, and the Conceptual Design of the three subsystem research experiments. The Preliminary Design Baseline for the Pilot Plant was developed from the commercial plant conceptual design that had been defined prior to the start of this program. It definitized each of the basic Pilot Plant Subsystems and provided the basis for development of the conceptual designs of the research experiments. For each of the solar peculiar subsystems, the Collector Subsystem, the Receiver Subsystem and the Thermal Storage Subsystem, a subsystem research experiment was planned. The Conceptual Design of each of these experiments was prepared and reviewed with ERDA and Sandia in order to obtain authorization for the design, build and test of these experiments. In the Collector Subsystem experiment the design was completed, the four experimental heliostats have been fabricated and erected. Initial calorimeter and radiometer data have been obtained and have demonstrated good correlation with the projected performance. The 5 megawatt thermal experiment receiver has been fabricated by Foster Wheeler Energy Corporation and is now completing erection at the Radiant Heat Test Facility at Sandia in Albuquerque, New Mexico. This testing is scheduled for the period from December 1976 through February 1977. The Thermal Storage Research Experiment fabrication and erection is nearing completion by Georgia Institute of Technology. Checkout of this experiment is scheduled for the first of December 1976 with the test program to be complete by the end of January 1977.

  14. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  15. Summary of the annual report 2003

    International Nuclear Information System (INIS)

    2003-01-01

    With manufacturing facilities in over 40 countries and a sales network in over 100, AREVA offers customers technological solutions for nuclear power generation and electricity transmission and distribution. The group also provides interconnect systems to the telecommunications, computer and automotive markets. These businesses engage AREVA 70000 employees in the 21 century greatest challenges: making energy and communication resources available to all, protecting the planet, and acting responsibly towards future generations. This annual report of the Areva group activities contents : Key data, milestones of the group, AREVA global operations in 2003, Corporate governance, organization of the group, share information, the financial responsibility, the environmental responsibility, the social responsibility, the business overview, the global challenges in AREVA energy business, the research and development programs, the front end division reactors and services division, the back end division, the transmission and distribution division. (A.L.B.)

  16. INTEGRATED CORPORATE STRATEGY MODEL

    Directory of Open Access Journals (Sweden)

    CATALINA SORIANA SITNIKOV

    2014-02-01

    Full Text Available Corporations are at present operating in demanding and highly unsure periods, facing a mixture of increased macroeconomic need, competitive and capital market dangers, and in many cases, the prospect for significant technical and regulative gap. Throughout these demanding and highly unsure times, the corporations must pay particular attention to corporate strategy. In present times, corporate strategy must be perceived and used as a function of various fields, covers, and characters as well as a highly interactive system. For the corporation's strategy to become a competitive advantage is necessary to understand and also to integrate it in a holistic model to ensure sustainable progress of corporation activities under the optimum conditions of profitability. The model proposed in this paper is aimed at integrating the two strategic models, Hoshin Kanri and Integrated Strategy Model, as well as their consolidation with the principles of sound corporate governance set out by the OECD.

  17. Areva 2005 annual report; Areva rapport annuel 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This annual report contains information on AREVA's objectives, prospects and strategies, particularly in Chapters 4 and 7, as well as contains information on the markets, market shares and competitive position of the AREVA group. Content: 1 - Person responsible for the annual report and persons responsible for auditing the financial statements; 2 - Information pertaining to the transaction; 3 - General information on the company and share capital: Information on AREVA, Information on share capital and voting rights, Investment certificate trading, Dividends, Organizational chart of the AREVA group, Equity interests, Shareholders' agreements; 4 - Information on company operations, 5 - New developments and future prospects: Overview and strategy of the AREVA group, The Nuclear Power and Transmission and Distribution markets, AREVA group energy businesses, Front End Division, Reactors and Services Division, Back End Division, Transmission and Distribution Division, Major Contracts, The Group's principal sites, AREVA's customers and suppliers, Human resources, Sustainable Development and Continuous Improvement, Capital spending programs, Research and development, intellectual property and brand name programs, Risk and insurance; 6 - Assets - Financial position - financial performance: Analysis of and comments on the Group's financial position and performance, Human Resources report 2005, Environmental report, Consolidated financial statements, Notes to the consolidated financial statements, AREVA SA Financial statements 2005, Notes to the corporate financial statements; 7 - Corporate governance: Composition and functioning of administrative bodies, Executive compensation, Profit-sharing plans, AREVA Values Charter, Annual General Meeting of Shareholders of May 2, 2006; 8 - Recent developments and outlook: Events subsequent to year-end closing for 2005, Outlook.

  18. Experimental study of a model and parameters calculating annual mean atmospheric dispersion factor for a nuclear power plant to be build in coastal site

    International Nuclear Information System (INIS)

    Hu Erbang; Chen Jiayi; Zhang Maoshuan; Gao Zhanrong; Yao Rentai; Jia Peirong; Qiao Qingdang

    1999-01-01

    The author tries to develop a new model calculating annual mean atmospheric dispersion factor for a nuclear power plant to be build in coastal site based on field experiments. This model considers not only the difference between shore ward and off-shore but also the comprehensive effect of following factors: mixed layer and thermal internal boundary layer, mixing release and variation of diffusion parameters due to the distance from coast and so on. The various parameters needed in the model are obtained from the field atmospheric experiments done on the NPP site during 1995∼1996. There dimension joint frequency is got from wind and temperature measurements at 4 heights of a tower of 100 m; diffusion parameters shore ward and off-shore from turbulent measurement and wind tunnel simulation test; the parameters relative to sea and land breeze and thermal internal boundary layer are obtained from tests with low altitude radiosonde and lost balloon at 3 sites during two periods of Summer and Winter. Finally a comparison of the results given by this model and commonly used model provided by relative guides is done. The comparison shows that about 1 times under estimation is found for the maximum of annual mean atmospheric dispersion factor in common model because the effect from thermal internal boundary layer and other factors are neglected

  19. State Electricity Commission of Victoria annual report 1991/92

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The 73rd annual report of the State Electricity Commission (SEC) of Victoria covers the financial year ended 30 June 1992. A total revenue of 3,300 million dollars and a net profit of 155.7 million dollars was recorded. There was continued improvement in employee productivity. Progress was made on the Victorian Power Pool (VicPool) pooling arrangement in anticipation of open access to the power grid. A 3-year business plan was formulated and corporate strategy revised. The Strategic Research Program on brown coal technologies, aimed at reducing costs of electricity and emissions of CO[sub 2], continued. Environmental activities continued in the areas of renewable energy source development, air quality monitoring, acid rain, water management, land rehabilitation and improvements to powerlines. The report includes statistical data on customer statistics, electricity sales, power stations, brown coal and briquette production and financial sales.

  20. Corporate Finance, Incomplete Contracts, and Corporate Control

    OpenAIRE

    Patrick Bolton

    2014-01-01

    This essay in celebration of Grossman and Hart (GH) (Grossman, S., and H. Oliver. 1986. "The Costs and Benefits of Ownership: A Theory of Vertical and Lateral Integration," 94 Journal of Political Economy 691–719.) discusses how the introduction of incomplete contracts has fundamentally changed economists’ perspectives on corporate finance and control. Before GH, the dominant theory in corporate finance was the tradeoff theory pitting the tax advantages of debt (relative to equity) against ba...

  1. 2017 NEA Annual Report: Nuclear Power in 2017; Innovation and Education: Necessary Enablers for Sustainable Nuclear Energy, or the Virtuous Circle; NEA Activities by Sector

    International Nuclear Information System (INIS)

    2018-01-01

    The NEA Annual Report of the OECD Nuclear Energy Agency (NEA) for the year ending on 31 December 2017 provides an overview of the status of nuclear power in OECD countries and illustrative descriptions of the Agency's activities and international joint projects. Content: 1 - Message from the Director-General; 2 - Innovation and Education: Necessary Enablers for Sustainable Nuclear Energy, or the Virtuous Circle; 3 - Nuclear Technology in 2017; 4 - NEA Activities by Sector: Nuclear Development, Nuclear Safety and Regulation, Human Aspects of Nuclear Safety, Radiological Protection, Radioactive Waste Management, Nuclear Science, Data Bank, Legal Affairs, 5 - General Information: Information and Communications, Organisational Structure of the NEA, NEA Committee Structure in 2017, NEA Management Structure in 2017, NEA Publications and Brochures Produced in 2017

  2. The Mechanisms for the State Supporting the Development of Corporations

    Directory of Open Access Journals (Sweden)

    Riabokin Taras V.

    2017-01-01

    Full Text Available The main aim of the article is the theoretical substantiation of the necessity to build an efficient mechanism for the State supporting the corporate development, taking account of the main national and corporate interests. As result of processing and analyzing the available scientific-methodological and practical approaches to development of corporations and the State impact on this process, the phased scheme of the corporate development has been proposed, defining the main corporate and national priorities in each of the stages. On the basis of the administrative, fiscal, and monetary methods, the key directions for coordination of development of the individual corporations have been allocated and a mechanism for the State support has been proposed, implementation of which will provide to harmonize the public and the corporate interests, achieve the total recovery of the national economy. It has been pointed out to the need of creating on the basis of the powerful corporations an effective system of the corporate social responsibility as one of the main directions for harmonization of the national and the corporate interests. Promising directions for further research will be solving the problems associated with the long-term investment in the corporate development, determining and then minimizing the major risks at the stage of appearance of corporations at the international level.

  3. Annual meeting on nuclear technology '85. Technical session on nuclear power plant simulators. Jahrestagung Kerntechnik '85. Fachsitzung Simulatoren bei Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    The ten lectures read at this Technical Session deal with nuclear power plant simulators and their functions for the training of control room personnel, with test facilities for analysis and simulation of incidents and the relevant plant behaviour, and with the computer codes for fast simulation of reactor processes. The papers explain in particular the HAMMLAB project, the COSIMA fast core simulator, and the OPAL simulator for the KWU convoy process information system named PRINS.

  4. Development and evaluation of a Stirling-powered cardiac assist system. Annual report, May 1974--Jul 1975

    International Nuclear Information System (INIS)

    Andrus, S.; Faeser, R.J.; Moise, J.; Hoffman, L.C.; Rudnicki, M.I.

    1975-09-01

    The Stirling-Cycle engine is designed to power implantable physiologically compatible heart-assist and total heart replacement devices. Heat is provided by a 238 Pu radioisotope capsule. Program activity during this report period included the development of the PAC-5 and PAC-5M actuators and the MK-VII engine. The report describes extensive endurance and accelerated life testing of complete LVAD systems and individual components

  5. The community's research and development programme on decommissioning of nuclear power plants. Third annual progress report (year 1982)

    International Nuclear Information System (INIS)

    1984-01-01

    This is the third progress report of the European Community's programme (1979-83) of research on the decommissioning of nuclear power plants. It covers the year 1982 and follows the 1980 and 1981 reports (EUR 7440, EUR 8343). Since 1982 was a very active year of research under the programme, this report contains a large amount of results. Besides, the work programmes of some additional research contracts, awarded through 1982, are described

  6. Corporate strategic branding: How country and corporate brands come together

    Directory of Open Access Journals (Sweden)

    Đorđević Bojan

    2008-01-01

    Full Text Available The concept of countries as brands has been increasingly recognized in the post-modern global world. A strong country brand can provide corporate brands with a unique set of values, which supports their positioning on the international market. Simultaneously, once corporate brands achieve worldwide success, they contribute actively to developing new features of the country brand. Consumers pay more and more attention to products' country of origin. When the name of a country is mentioned, they can have positive associations (high quality, modern design, product innovation, which means that the country itself has a powerful brand. However, there are opposite cases where we talk about the weak branding of a particular country. It is necessary to mobilize all the available forces of politicians, business people, artists, sportsmen and scientists to create a strategy for enhancing the image and reputation of a country on the international markets, i.e. for creating the national branding strategy.

  7. FY2007 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, Mitchell [ORNL

    2007-10-01

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as 'FreedomCAR' (derived from 'Freedom' and 'Cooperative Automotive Research'), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieving the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Advanced Power Electronics and Electric Machines (APEEM) subprogram within the FreedomCAR and Vehicle Technologies Program provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on understanding and improving the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of hybrid propulsion systems, the APEEM effort has enabled the development of technologies that will significantly improve advanced vehicle efficiency, costs, and fuel economy. The APEEM subprogram supports the efforts of the FreedomCAR and Fuel Partnership through a three-phase approach intended to: (1) identify overall propulsion and vehicle-related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate technical targets for systems, subsystems, and component research and development activities; (2) develop and validate individual subsystems and components, including electric motors and power electronics; and (3) determine how well the components and subsystems work together in a vehicle environment or

  8. Universal Inverse Power-Law Distribution for Fractal Fluctuations in Dynamical Systems: Applications for Predictability of Inter-Annual Variability of Indian and USA Region Rainfall

    Science.gov (United States)

    Selvam, A. M.

    2017-01-01

    Dynamical systems in nature exhibit self-similar fractal space-time fluctuations on all scales indicating long-range correlations and, therefore, the statistical normal distribution with implicit assumption of independence, fixed mean and standard deviation cannot be used for description and quantification of fractal data sets. The author has developed a general systems theory based on classical statistical physics for fractal fluctuations which predicts the following. (1) The fractal fluctuations signify an underlying eddy continuum, the larger eddies being the integrated mean of enclosed smaller-scale fluctuations. (2) The probability distribution of eddy amplitudes and the variance (square of eddy amplitude) spectrum of fractal fluctuations follow the universal Boltzmann inverse power law expressed as a function of the golden mean. (3) Fractal fluctuations are signatures of quantum-like chaos since the additive amplitudes of eddies when squared represent probability densities analogous to the sub-atomic dynamics of quantum systems such as the photon or electron. (4) The model predicted distribution is very close to statistical normal distribution for moderate events within two standard deviations from the mean but exhibits a fat long tail that are associated with hazardous extreme events. Continuous periodogram power spectral analyses of available GHCN annual total rainfall time series for the period 1900-2008 for Indian and USA stations show that the power spectra and the corresponding probability distributions follow model predicted universal inverse power law form signifying an eddy continuum structure underlying the observed inter-annual variability of rainfall. On a global scale, man-made greenhouse gas related atmospheric warming would result in intensification of natural climate variability, seen immediately in high frequency fluctuations such as QBO and ENSO and even shorter timescales. Model concepts and results of analyses are discussed with reference

  9. Fitness for duty in the nuclear power industry. Volume 3, Annual summary of program performance reports, CY 1992

    Energy Technology Data Exchange (ETDEWEB)

    Fleming, T.; Westra, C.; Field, I.; Forslund, C.; Durbin, N.; Grant, T. [Battelle Human Affairs Research Centers, Seattle, WA (US); Moffitt, R. [Pacific Northwest Lab., Richland, WA (United States)

    1993-07-01

    This report summarizes the data from the semi-annual reports on fitness-for-duty programs submitted to the NRC by 52 utilities for two reporting periods: January 1 through June 30, 1992, and July 1 through December 31, 1992. During 1992, licensees reported that they had conducted 266,551 tests for the presence of illegal drugs and alcohol. Of these test, 1,818 (.68%) were confirmed positive. Positive test results varied by category of test and category of worker. The majority of positive test results (1,110) were obtained through pre-access testing. Of tests conducted on workers having access to the protected area, there were 461 positive tests from random testing and 178 positive tests from for-cause testing. Follow-up testing of workers who had previously tested positive resulted in 69 positive tests. For-cause testing resulted in the highest percentage of positive-tests; about 26% of for-cause tests were positive. This compares to a positive test rate of 1.06 percent of pre-access tests and .29 percent of random tests. Positive test rates also varied by category of worker. Overall, short-term contractor personnel had the highest positive test rate at 1.00 percent. Licensee employees and long-term contractors had lower positive test rates (.29% and .63%, respectively). Of the substances tested, marijuana was responsible for the highest percentage of positive test results (50.3%), followed by cocaine (24.8%) and alcohol (22.6%). Positive test results are also reported for NRC administrative regions and for plants located in areas with different rates of population density.

  10. ASPECTS REGARDING CORPORATE MANDATORY AND VOLUNTARY DISCLOSURE

    Directory of Open Access Journals (Sweden)

    Popa Adina

    2008-05-01

    Full Text Available The paper highlights theoretical aspects regarding corporate mandatory and voluntary disclosure. Since financial and business reporting are important information sources for different stakeholders, especially for publicly traded companies, the business reporting is increasingly oriented to the need of different users. In order to make rational investment decisions, users of corporate annual and interim reports require an extensive range of information. The increasing needs of the users persuade different international bodies and researchers to investigate the improvements that can be done in business reporting. The results of those studies usually were different reporting models. Because voluntary dimension of corporate disclosure involve the manifestation of free choice of the firm and its managers, we have considered as necessary to achieve a theoretical analysis of the main costs and profits of the voluntary disclosure policy.

  11. Strategic Risk Management and Corporate Value Creation

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Roggi, Oliviero

    Major corporate failures, periodic recessions, regional debt crises and volatile markets have intensified the focus on corporate risk management as the means to deal better with turbulent business conditions. Hence, the ability to respond effectively to the often dramatic environmental changes...... is considered an important source of competitive advantage. However, surprisingly little research has analyzed if the presumed advantages of effective risk management lead to superior performance or assessed important antecedents of effective risk management capabilities. Here we present a comprehensive study...... of risk management effectiveness and the relationship to corporate performance based on panel data for more than 3,400 firms accounting for over 33,500 annual observations during the turbulent period 1991-2010. Determining effective risk management as the ability to reduce earnings and cash flow...

  12. The Corporate Marketing Department

    DEFF Research Database (Denmark)

    Ritter, Thomas; Eggert, Andreas; Münkhoff, Eva

    Corporate marketing has been downsized or eliminated in many firms. At the same time, firms that still own a corporate marketing department struggle with organizing and positioning their commercial front‐end. The question arises whether firms need a corporate marketing department, and if so, how...... it can best add value to the firm. Based on a qualitative study among B2B companies, we develop a conceptual framework highlighting the various parental roles through which corporate marketing can contribute to overall firm and business unit performance. In addition, we identify five gaps that restrain...... successful outcomes of corporate marketing activities. In sum, our framework provides important insights on how to successfully organize corporate marketing activities....

  13. 25 CFR 226.8 - Corporation and corporate information.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Corporation and corporate information. 226.8 Section 226... RESERVATION LANDS FOR OIL AND GAS MINING Leasing Procedure, Rental and Royalty § 226.8 Corporation and corporate information. (a) If the applicant for a lease is a corporation, it shall file evidence of...

  14. VALUE CREATION THROUGH CORPORATE GOVERNANCE

    Directory of Open Access Journals (Sweden)

    Elena Chitimus

    2013-12-01

    Full Text Available Companies spend time and money in order to improve their corporate governance (CG system and also do not forget to inform third parties about their efforts in this field. CG studies the separation of power at an entity level and the segregation of responsibilities between shareholders, management, and board of directors. As a mechanism CG helps to align management’s goals with those of the stakeholders in order to avoid conflict and to sustain and develop a healthy company. The objective of this article is to show how corporate governance is defined, what does it stands for and why it is important or maybe better said why companies give it so much importance.

  15. 78 FR 52982 - Experian, Experian US Headquarters: Corporate Departments (Finance, HRMD, Contracts, Corporate...

    Science.gov (United States)

    2013-08-27

    ...,506R] Experian, Experian US Headquarters: Corporate Departments (Finance, HRMD, Contracts, Corporate... Headquarters: Corporate Departments (finance, HRMD, Contracts, Corporate Marketing, Global Corporate Systems... (finance, HRMD, Contracts, Corporate Marketing, Global Corporate Systems, Legal & Regulatory, Risk...

  16. ELETRONUCLEAR - Annual report - 1997

    International Nuclear Information System (INIS)

    1998-01-01

    The annual activities report of 1997 of ELETRONUCLEAR - Brazilian company responsible by the electric power generation from the nuclear technology - introduces the next main topics: company vision and mission; energy production and commercialization; investments in the electric power generation; economic and financial situation; social balancing; and patrimonial balancing

  17. International energy annual 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The International Energy Annual presents an overview of key international energy trends for production, consumption, imports, and exports of primary energy commodities in over 220 countries, dependencies, and areas of special sovereignty. Also included are population and gross domestic product data, as well as prices for crude oil and petroleum products in selected countries. Renewable energy reported in the International Energy Annual includes hydroelectric power, geothermal, solar, and wind electric power, biofuels energy for the US, and biofuels electric power for Brazil. New in the 1996 edition are estimates of carbon dioxide emissions from the consumption of petroleum and coal, and the consumption and flaring of natural gas. 72 tabs.

  18. FY 2005 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, M

    2005-11-22

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and DaimlerChrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from ''Freedom'' and ''Cooperative Automotive Research''), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Vehicle Systems subprogram within the FreedomCAR and Vehicle Technologies Program provides support and guidance for many cutting-edge automotive and heavy truck technologies now under development. Research is focused on understanding and improving the way the various new components of tomorrow's automobiles and heavy trucks will function as a unified system to improve fuel efficiency. This work also supports the development of advanced automotive accessories and the reduction of parasitic losses (e.g., aerodynamic drag, thermal management, friction and wear, and rolling resistance). In supporting the development of hybrid propulsion systems, the Vehicle Systems subprogram has enabled the development of technologies that will significantly improve fuel economy, comply with projected emissions and safety regulations, and use fuels produced domestically. The Vehicle Systems subprogram supports the efforts of the FreedomCAR and Fuel and the 21st Century Truck Partnerships through a three-phase approach intended to: (1) Identify overall propulsion and vehicle-related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements, then develop the

  19. Social-Economic Immobility: A Study of Fishermen’s Struggle among Corporation Powers in the East Coast of Kalimantan, Indonesia

    Directory of Open Access Journals (Sweden)

    Setiadi Setiadi

    2017-02-01

    Full Text Available A majority of fishermen in the coastal areas of Bumi Seribu Nyiur Melambai, East Kalimantan, Indonesia, are migrants from other islands of Indonesia. This paper presents results from a research of the fisherman community. Most of the fisherman came from lower-middle-class families. Both lower-and lower-middle-class fisherman have access to the development program, aids and others resources delivered by government and international corporate. This paper describes how most fisherman see and believe that Bumi Seribu Nyiur Melambai is an area of battle for many actors to upscale their economic and social mobility through accumulation of wealth and social status. Many fishermen express the ambiguity, uncertainty, and marginality of their social-economic status. The marginal status is caused by (i Long Story of Unequal Social Structure; (ii elite capture of programs and aids (iii uncertainty and the loss of fishing area due to the presence of the company; (iv Their technology are not able to resist the change of seasons. Data in this research are collected by qualitative and quantitative method, such as a participatory observation, in-depth interview, FGD, and survey.

  20. Creating corporate advantage.

    Science.gov (United States)

    Collis, D J; Montgomery, C A

    1998-01-01

    What differentiates truly great corporate strategies from the merely adequate? How can executives at the corporate level create tangible advantage for their businesses that makes the whole more than the sum of the parts? This article presents a comprehensive framework for value creation in the multibusiness company. It addresses the most fundamental questions of corporate strategy: What businesses should a company be in? How should it coordinate activities across businesses? What role should the corporate office play? How should the corporation measure and control performance? Through detailed case studies of Tyco International, Sharp, the Newell Company, and Saatchi and Saatchi, the authors demonstrate that the answers to all those questions are driven largely by the nature of a company's special resources--its assets, skills, and capabilities. These range along a continuum from the highly specialized at one end to the very general at the other. A corporation's location on the continuum constrains the set of businesses it should compete in and limits its choices about the design of its organization. Applying the framework, the authors point out the common mistakes that result from misaligned corporate strategies. Companies mistakenly enter businesses based on similarities in products rather than the resources that contribute to competitive advantage in each business. Instead of tailoring organizational structures and systems to the needs of a particular strategy, they create plain-vanilla corporate offices and infrastructures. The company examples demonstrate that one size does not fit all. One can find great corporate strategies all along the continuum.

  1. Corporate Business Diplomacy

    DEFF Research Database (Denmark)

    Søndergaard, Mikael

    2014-01-01

    This article illustrates the interdisciplinary nature of the field of corporate business diplomacy using examples from academic disciplines, such as economics and political science, which can contribute to the understanding of corporate business diplomacy. Examples also show that corporate business...... diplomacy can complement business theories such as stakeholder theory and agency theory. Examples from practice show that in a broad sense, corporate business diplomacy is concerned with managing external stakeholders, while in a narrow sense, it is concerned with managing internal stakeholders....... The usefulness of an analytical research triangulation is illustrated....

  2. FY2014 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Motors Program

    Energy Technology Data Exchange (ETDEWEB)

    Ozpineci, Burak [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2014-11-01

    The US Department of Energy (DOE) announced in May 2011 a new cooperative research effort comprising DOE, the US Council for Automotive Research (composed of automakers Ford Motor Company, General Motors Company, and Chrysler Group), Tesla Motors, and representatives of the electric utility and petroleum industries. Known as U.S. DRIVE (Driving Research and Innovation for Vehicle efficiency and Energy sustainability), it represents DOE’s commitment to developing public–private partnerships to fund high-risk–high-reward research into advanced automotive technologies. The new partnership replaces and builds upon the partnership known as FreedomCAR (derived from “Freedom” and “Cooperative Automotive Research”) that ran from 2002 through 2010 and the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. Oak Ridge National Laboratory’s (ORNL’s) Advanced Power Electronics and Electric Motors (APEEM) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor, and traction drive system (TDS) technologies that will leapfrog current on-the-road technologies, leading to lower cost and better efficiency in transforming battery energy to useful work. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow’s automobiles will function as a unified system to improve fuel efficiency through research in more efficient TDSs.

  3. Nuclear Energy Research Initiative. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants. Annual Report

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.

    2000-01-01

    The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-informed approach for the design and regulation of nuclear power plants. This approach will include the development and.lor confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRs) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go farther by focusing on the design of new plants

  4. Nuclear Energy Research Initiative. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants. Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Ritterbusch, S.E.

    2000-08-01

    The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-informed approach for the design and regulation of nuclear power plants. This approach will include the development and.lor confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRs) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go farther by focusing on the design of new plants.

  5. FY2010 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, Mitchell [ORNL

    2010-10-01

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from ''Freedom'' and ''Cooperative Automotive Research''), it represents DOE's commitment to developing public-private partnerships to fund high risk, high payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Oak Ridge National Laboratory's (ORNL's) Advanced Power Electronics and Electric Machines (APEEM) subprogram within the DOE Vehicle Technologies Program (VTP) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE) and electric motor technologies that will leapfrog current on-the-road technologies. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of advanced vehicle propulsion systems, the APEEM subprogram has enabled the development of technologies that will significantly improve efficiency, costs, and fuel economy. The APEEM subprogram supports the efforts of the FreedomCAR and Fuel Partnership through a three phase approach intended to: (1) identify overall propulsion and vehicle related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate technical targets for systems

  6. Internal marketing for engaging employees on the corporate responsibility journey

    OpenAIRE

    Sanchez-Hernandez, Isabel; Grayson, David

    2012-01-01

    Purpose: The purpose of this paper is to explore whether internal marketing could be a powerful tool for engaging employees on the corporate responsibility journey. Design/methodology/approach: In the absence of empirical work linking internal marketing efforts in organizations and employee engagement in corporate responsibility issues, a conceptual approach based on literature review is carried out to determine the existing possibilities provided by internal marketing to enhance corporate re...

  7. The Relationship of Public Relations and Board-Level Boundary-Spanning Roles to Corporate Social Responsibility.

    Science.gov (United States)

    Ferguson, Mary Ann; And Others

    The annual reports of 197 publicly held American corporations were analyzed to determine the relationship of corporate social responsibility activities to boundary-spanning activities (attempts to relate the firm to the outside world). Data gathered included (1) the number of directors from inside and outside a corporation, (2) the number of…

  8. Corporate Governance Country Assessment : Malaysia

    OpenAIRE

    World Bank

    2012-01-01

    This report assesses Ghana s corporate governance policy framework. It highlights recent improvements in corporate governance regulation, makes policy recommendations, and provides investors with a benchmark against which to measure corporate governance in Ghana. It is an update of the 2005 Corporate Governance ROSC. Good corporate governance enhances investor trust, helps to protects mino...

  9. FY2011 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, Mitchell [ORNL

    2011-10-01

    The U.S. Department of Energy (DOE) announced in May 2011 a new cooperative research effort comprising DOE, the U.S. Council for Automotive Research (composed of automakers Ford Motor Company, General Motors Company, and Chrysler Group), Tesla Motors, and representatives of the electric utility and petroleum industries. Known as U.S. DRIVE (Driving Research and Innovation for Vehicle efficiency and Energy sustainability), it represents DOE's commitment to developing public-private partnerships to fund high risk-high reward research into advanced automotive technologies. The new partnership replaces and builds upon the partnership known as FreedomCAR (derived from 'Freedom' and 'Cooperative Automotive Research') that ran from 2002 through 2010 and the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machines (PEEM) subprogram within the DOE Vehicle Technologies Program (VTP) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor (EM), and traction drive system technologies that will leapfrog current on-the-road technologies. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of advanced vehicle propulsion systems, the PEEM subprogram has enabled the development of technologies that will significantly improve efficiency, costs, and fuel economy. The PEEM subprogram supports the efforts of the U.S. DRIVE partnership through a three phase approach intended to: (1) identify overall propulsion and vehicle related needs by analyzing programmatic goals and reviewing industry

  10. Corporate Social Responsibility of Multinational Oil Corporations to ...

    African Journals Online (AJOL)

    Corporate Social Responsibility of Multinational Oil Corporations to Host ... Exxon Mobil and Elf oil Nigeria Limited within their corporate-community relations strategy in the ... The paper concludes by exploring the implications for partnerships' ...

  11. 2012 CPES Annual Report

    OpenAIRE

    Virginia Tech. Center for Power Electronics Systems

    2012-01-01

    The Center for Power Electronics Systems at Virginia Tech is a research center dedicated to improving electrical power processing and distribution that impact systems of all sizes – from battery – operated electronics to vehicles to regional and national electrical distribution systems. Our mission is to provide leadership through global collaborative research and education for creating advanced electric power processing systems of the highest value to society. CPES, with annual research expe...

  12. Strategic corporate sustainability

    DEFF Research Database (Denmark)

    Grewatsch, Sylvia; Rohrbeck, René; Madsen, Henning

    antecedents and outcomes. To overcome this limitation we propose an integrated typology which may facilitate more research on the link between corporate sustainability performance (CSP) and corporate financial performance (CFP). Our expectation is that the strategy type might play a moderating or mediating...

  13. The Corporate Law Curriculum

    Science.gov (United States)

    Mofsky, James S.

    1976-01-01

    On the premise that corporate counsel must be an able diagnostician before he can focus on highly specialized and interrelated issues of business law, the author suggests an approach to corporate law curriculum in which the basic course balances the quality and quantity of material designed to create the needed sensitivity. (JT)

  14. Corporate design management

    NARCIS (Netherlands)

    drs. Patrick van Thiel; drs. Wil Michels

    2006-01-01

    'Corporate designmanagement' is een vlot geschreven en zeer overzichtelijk standaardwerk op het gebied van corporate designmanagement. Een sterke visuele identiteit is voor een organisatie een doeltreffend middel om zich te positioneren en te profileren. Voorwaarde is wel dat de visuele identiteit

  15. Corporation as climate ambassador

    DEFF Research Database (Denmark)

    Trapp, Leila

    2012-01-01

    At a time when corporations are addressing increasingly complex, global corporate social responsibility (CSR) issues, this study examines and evaluates the strategies used in Vattenfall’s challenging and innovative CSR campaign which aimed at establishing the energy company as a credible climate...

  16. Understanding Corporate Culture.

    Science.gov (United States)

    Cluff, Gary A.

    1988-01-01

    Considers concept of corporate culture and discusses several values which can be considered when assessing corporate culture, and the "compatibility scales" used to measure them. Included are discussions of employee attitudes, work atmosphere, internal communications, management style, employment opportunity, stability, business ethics, corporate…

  17. Piercing the corporate veil

    International Nuclear Information System (INIS)

    Goodwin, L.M.

    1992-01-01

    This article addresses the potential problems an economically troubled subsidiary can cause a parent company and offers strategies for insulating the trouble through good business practices and careful planning. The topics of the article include corporations and limited liability, piercing the corporate veil, environmental cleanup liabilities, and avoiding trouble

  18. Corporate Media Governance

    NARCIS (Netherlands)

    Kempen, Petrus Cornelis

    2011-01-01

    The media can make or break a reputation. This being said, it seems to be essential for companies, governments and institutions to pay specific attention to corporate media management in their daily operations. However, this thesis shows that they often neglect to pay adequate attention to corporate

  19. Reinventing Corporate Communications.

    Science.gov (United States)

    Toth, Elizabeth L.; Trujillo, Nick

    1987-01-01

    Urges a "re-inventing" of corporate communications in today's organizations, and provides information about how corporations can change in new and positive ways during the current "information age." Discusses specific public relations and organizational communication concepts essential for a comprehensive understanding of…

  20. Progress report on nuclear science and technology in China (Vol.3). Proceedings of academic annual meeting of China Nuclear Society in 2013, No.7--pulse power technology and its application sub-volume

    International Nuclear Information System (INIS)

    2014-05-01

    Progress report on nuclear science and technology in China (Vol. 3) includes 18 articles which are communicated on the third national academic annual meeting of China Nuclear Society. There are 10 books totally. This is the seventh one, the content is about pulse power technology and its application sub-volume