  1. Assessment of technical risks

    Energy Technology Data Exchange (ETDEWEB)

    Jaeger, T A [Bundesanstalt fuer Materialpruefung, Berlin (Germany, F.R.)

    1978-01-01

    The safety of technical systems is so difficult to assess because the concept 'risk' contains technical-scientific factors as well as components of individual and social psychology. Immediate or short-term hazards of human life as i.e. caused by the operation of industrial plants and mediate and thus long-term hazards have to be distinguished. Characteristic for the second hazard groups is the great time-lag before the effect takes place. Thus a causal relationship can be recognized only late and not definitely. Even when the causes have been obviated the effects still show. The development of a systems-analytical model as a basis of decisive processes for the introduction of highly endangered large-scale technologies seems particularly difficult. A starting point for the quantification of the risk can still be seen in the product of the probability of realization and the extent of the damage. Public opinion, however, does not base its evaluations on an objective concept of risk but tends to have an attitude of aversion against great and disastrous accidents. On the other hand, plenty of slight accidents are accepted much more easily, even when the amount of deadly victims from accidents reaches dimensions beyond those of the rare large-scale accidents. Here, mostly the damage possible but not the probability of its occurence is seen, let alone the general use of the new technology. The value of the mathematical models for estimating risks is mainly due to the fact that they are able to clear up decisions.

  2. Methodology for technical risk assessment

    International Nuclear Information System (INIS)

    Waganer, L.M.; Zuckerman, D.S.

    1983-01-01

    A methodology has been developed for and applied to the assessment of the technical risks associated with an evolving technology. This methodology, originally developed for fusion by K. W. Billman and F. R. Scott at EPRI, has been applied to assess the technical risk of a fuel system for a fusion reactor. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications (i.e. probability of failure). The individual steps in the technical risk assessment are summarized. The first step in this methodology is to clearly and completely quantify the technical requirements for the particular system being examined. The next step is to identify and define subsystems and various options which appear capable of achieving the required technical performance. The subsystem options are then characterized regarding subsystem functions, interface requirements with the subsystems and systems, important components, developmental obstacles and technical limitations. Key technical subsystem performance parameters are identified which directly or indirectly relate to the system technical specifications. Past, existing and future technical performance data from subsystem experts are obtained by using a Bayesian Interrogation technique. The input data is solicited in the form of probability functions. Thus the output performance of the system is expressed as probability functions

  3. Technical risk and society

    International Nuclear Information System (INIS)

    Lindackers, K.H.

    1983-01-01

    The report explains the possibilities and limits of risk analysis, risk assessment by the citizen, especially in hearings in the course of licensing procedures, and decisive causes why assessments on the part of the citizens may fail. (HP) [de

  4. Technical risk - individual responsibility

    International Nuclear Information System (INIS)

    Herzog, R.

    1984-01-01

    The author, vice-president of the Federal Constitutional Court, delivered this opening address at the international symposium on nuclear liability held in Munich in September 1984 by OECD/NEA and IAEA. He starts by asking: Where does danger begin, where does risk end. It is the true and original task of the state to keep damage away from its citizens: this entails the obligation for additional garantees - not withstanding an almost greatest possible degree of safety - to at least helpfully compensate damage incurred, should such damage arise. In case of really severe accidents the essential thing is not the operator's liability but the entry of the state into that obligation, and this fact remains unchanged even if the maximum limits of liability were raised or in case of their removal. Therefore it is not necessary to be cautious about the question of unlimited liability, i.e. the unlimited entry of the state into such obligations, especially as all those responsible are convinced that there is practically no risk of that contingency occurring. (HSCH) [de

  5. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  6. The assessment of technical risks

    International Nuclear Information System (INIS)

    Jaeger, T.A.

    1978-01-01

    The safety of technical systems is so difficult to assess because the concept 'risk' contains technical-scientific factors as well as components of individual and social psychology. Immediate or short-term hazards of human life as i.e. caused by the operation of industrial plants and mediate and thus long-term hazards have to be distinguished. Characteristic for the second hazard groups is the great time-lag before the effect takes place. Thus a causal relationship can be recognized only late and not definitely. Even when the causes have been obviated the effects still show. The development of a systems-analytical model as a basis of decisive processes for the introduction of highly endangered large-scale technologies seems particularly difficult. A starting point for the quantification of the risk can still be seen in the product of the probability of realization and the extent of the damage. Public opinion, however, does not base its evaluations on an objective concept of risk but tends to have an attitude of aversion against great and disastrous accidents. On the other hand, plenty of slight accidents are accepted much more easily, even when the amount of deadly victims from accidents reaches dimensions beyond those of the rare large-scale accidents. Here, mostly the damage possible but not the probability of its occurence is seen, let alone the general use of the new technology. The value of the mathematical models for estimating risks is mainly due to the fact that they are able to clear up decisions. (orig./HP) [de

  7. Integrated risk - healthy technical conscience

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, P. [Institute of Nuclear Power Operations, Atlanta, GA (United States)

    2015-07-01

    The personal obligation leaders and individuals internalize and exercise to ensure plant operation, maintenance, and engineering activities are conducted in a manner consistent with plant design, emergency response strategies, technical requirements and that preserve operating, design and safety margins. Technical errors are increasing, both in number and significance. Causes are common at many utilities. The majority of these engineering human performance weaknesses have not had immediate impact on station reliability and safety (not self-revealing). In some recent projects, the same weaknesses affected a station's viability.

  8. Technical risk and social perception

    Energy Technology Data Exchange (ETDEWEB)

    Muench, E; Renn, O

    1982-09-01

    In insurance science and natural science risks are defined as the expected extent of damages per time unit, i.e. risks are determined by empirical data representing the average number of people who incur damages in one year or one decade. In the social sciences the concept of risk is understood as the paragon of all unforeseeable consequences of an event or an action, or even plainly as the sum of things threatening our life and environment. Of course, the intuitive understanding of the concept is also of interest: what do people consider risky, how do they assess risks and how do they cope with risky situations. It is a chief task of interdisciplinary research to investigate the tension between the scientific and intuitive perception of risks and to develop political recommendations for those responsible for decision-making.

  9. Technical risk and social perception

    International Nuclear Information System (INIS)

    Muench, E.; Renn, O.

    1982-01-01

    In insurance science and natural science risks are defined as the expected extent of damages per time unit, i.e. risks are determined by empirical data representing the average number of people who incur damages in one year or one decade. In the social sciences the concept of risk is understood as the paragon of all unforeseeable consequences of an event or an action, or even plainly as the sum of things threatening our life and environment. Of course, the intuitive understanding of the concept is also of interest: what do people consider risky, how do they assess risks and how do they cope with risky situations. It is a chief task of interdisciplinary research to investigate the tension between the scientific and intuitive perception of risks and to develop political recommendations for those responsible for decision-making. (orig./UA) [de

  10. Risk management through dynamic technical specifications

    International Nuclear Information System (INIS)

    Klopp, George T.; Petersen, Thomas A.

    2004-01-01

    The wide deployment of plant specific probabilistic risk assessments for nuclear power plants has provided the means to effect a fresh risk management perspective and a fresh, risk based, regulatory outlook on nuclear power. There has been a great deal of conversation on risk based regulation within the U. S. nuclear power industry but, curiously, very little on effective risk management. This paper proposes a means to link the two subjects through the plant Technical Specifications. A revised concept for Technical Specifications is suggested which is based on deterministic analyses and probabilistic risk assessments for each plant. The revised Technical Specifications would consider, on a real-time basis, the exact state of the plant in terms of the status of key components and systems. It would depict current plant risk levels and compare those levels to the desired and limiting (alert/action) levels. It would advise the plant operator on the risk impact of proposed actions through a simple query system and illustrate the impact of such actions on plant status relative to designated risk values. The basis for the proposed approach lies in realistic deterministic plant analyses and probabilistic risk assessment (PRA) deployment tools being developed, in parallel, by a number of parties in the U.S. today. These PRAs are based primarily on the existing plant responses to Generic Letter 88-20, 'Individual Plant Examinations' (IPEs). Each of these tools allows the plant operator to input, on a real-time basis, the status of key equipment and systems. The tools then provide explicit illustrations of dependency effects; updated, 'real-time' risk status indications such as core damage frequency; and, in some cases, allow the operator to assess the risk impact of removing from service selected components for maintenance or testing. These systems generally operate on personal computers and provide nearly instantaneous responses to plant queries. Moving from these tools to

  11. Judicial action and technical risk

    International Nuclear Information System (INIS)

    Buiren, S. van; Ballerstedt, E.; Grimm, D.

    1981-05-01

    In this study it is examined how the judiciary deals with those sections that are crucial for the use of nuclear energy. The authors get down to the pre-dominant problem of the law relating to technical safety. In the process they encounter the central dilemma of modern democracy, i.e. the strained relations which exist between judicial control and democratic responsibility. Since nuclear energy entered the market place, it has been the administrative courts which - in practice - have decided whether and to what extent nuclear energy may be used. On the one hand, this is a result of the fast growth of, and rapid change in, science and technology. On the other hand, it is a result of administrative law standards which have developed in the Federal Republic of Germany after World War II. The former requires the normative structure of the atomic law, the latter postulates how to deal with it. Legal protection against an act of public authority is guaranteed by the Basic Law and usually with some justification considered a splendid achievement of our state which is based on the rule of law. It has lead to developments in the atomic law and in many parts of the law relating to technical safety on which opinions are divided. In a dogmatic manner it has been legally examined to what extent an extensive review competence of the judiciary is a must, and whether there are any possibilities of judicial control of acts of public authorities without having to interfere with the original competence of administrations. (orig./HP) [de

  12. Technic, environmental and risk society

    International Nuclear Information System (INIS)

    Gomez G, Luis Jair

    2009-01-01

    Throughout modernity, man goes from feeling subjugated by nature to feeling its master. For this, it relies on rationalism, which is inherent to the development of modern science and technique as the most prominent expression of progress. And furthermore, along with this feature of modern man, appears the individual who claims for individual freedom and launches competition with other individuals. The Nation State was configured within the social background of this age as were, together with it, political economy and private property which shaped Capitalism, whose main goal is individual accumulation. This new form of social order favored the growth of the population from 500 million inhabitants in 1500 to 6 billion in 2000 industrial development which implies a growing demand of mainly fossil fuels, an intensive trade that stimulates commercial interchange between different regions, and, as a consequence, long distance transport which also requires high energy consumption. Industry and trade generate modern cities with all their intrinsic demands: an intensive exploitation of natural resources which led to an overload of natural cycles and to a huge overload of drains for the disposal of solid, liquid and gas waste. This caused an alarming ecological deterioration which led to a civilization crisis configured within the so called risk society. This overwhelming deterioration demands a redefinition of the analytical approach of science in order to embrace a systemic view which will center on the complexity of nature as a way to compensate the spoiled operational balance of biosphere, and of the relation society/nature. It is also necessary to join the damaged communities together with the groups of technicians in the construction of the most feasible solutions in what has been called post normal technique.

  13. Social risk assessment of large technical systems

    NARCIS (Netherlands)

    Pasman, H.J.; Vrijling, J.K.

    2003-01-01

    A probabilistic approach to engineering advances. Since risk adhering to a technical structure can be determined quantitatively easier and more accurately than before, criteria for decision making are becoming more important. If the structure is in the public domain, and benefits are not felt, the

  14. Risk based technique for improving technical specifications

    International Nuclear Information System (INIS)

    Kim, I. S.; Jae, M. S.; Kim, B. S.; Hwang, S. W.; Kang, K. M.; Park, S. S.; Yu, Y. S.

    2001-03-01

    The objective of this study is to develop the systematic guidance for reviewing the documents associated with the changes of technical specifications. The work done in this fiscal year is the following : surveys in TS requirements, TS improvements and TS regulations in foreign countries as well as Korea, surveys on the state-of-the-art of RITSs and their use in Korea, development of a decision-making framework for both the licensee and the regulation agency, description of risk measures, assessment methodology on STI/AOT, and adverse effects caused by periodic maintenance, which are explained in appendix. The results of this study might contribute to enhancing the quality of the current technical specifications and contribute to preparing the risk informed regulation program using the decision-making framework developed in this study

  15. Risks, doubt, scientific and technical expert appraisement

    International Nuclear Information System (INIS)

    Decrop, G.

    1993-01-01

    In complex systems which compose modern societies, expert report is going to take an increasing place. In its usual definition, expert is justified by a superior authority, his knowledge comes from experience, he is present as a third party where he has to work. It is often forgotten two other important points, connected with the situation: it is a tangling of technical or natural systems with a social system and above all there is a risk of uncertainty. Then, the job of expert is different from scientific work done in laboratories and different from operational work done by engineers

  16. Risk-informed approach in US-APWR technical specifications

    International Nuclear Information System (INIS)

    Saji, Etsuro; Tanaka, Futoshi; Kuroiwa, Katsuya; Kawai, Katsunori

    2009-01-01

    The Risk-Managed Technical Specifications and the Surveillance Frequency Control Program have been adopted in the US-APWR Technical Specifications. These risk-informed approaches are unique among the technical specifications for the advanced light water reactor designs adopted by planned nuclear power stations in the United States. (author)

  17. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  18. Technical risks viewed from a legal point of view

    International Nuclear Information System (INIS)

    Marburger, P.

    1985-01-01

    Law has to impose restrictions to technology to assure its general compatibility. The difficult problems of handling technical risks by legislation are solvable. The scientific-technical knowledge which is a prerequisite of legislation is obtainable from the technical standards worked out by private organisations and from bodies of experts under public law. The system of law must not antagonize technology. (HP) [de

  19. Case studies: Risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Wagner, D.P.; Minton, L.A.; Gaertner, J.P.

    1987-01-01

    The SOCRATES computer program uses the results of a Probabilistic Risk Assessment (PRA) or a system level risk analysis to calculate changes in risk due to changes in the surveillance test interval and/or the allowed outage time stated in the technical specification. The computer program can accommodate various testing strategies (such as staggered or simultaneous testing) to allow modeling of component testing as it is carried out at a plant. The methods and computer program are an integral part of a larger decision process aimed at determining benefits from technical specification changes. These benefits can include cost savings to the utilities by reducing forced shutdowns with no adverse impacts on risk. Three summaries of case study applications are included to demonstrate the types of results that can be achieved through risk-based evaluation of technical specifications. (orig.)

  20. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  1. Ethical dimensions in assessing technical risks

    International Nuclear Information System (INIS)

    Birnbacher, D.

    1991-01-01

    Contrary to the present tendency of partially impact-independent technology assessment, the author does not see a difference between a risk-benefit analysis and an ethical technology assessment. As long as the risk-benefit analysis is truly comprehensive, both fall together. This does not mean that convictions of those who have their doubts about some new technologies, independently of impact assessments, may be disregarded in purely consequential risk evaluations. On the contrary, qualms of representatives of these principles, just as any other stable non-acceptance, have to be included as aggravating negative elements in technology assessments. (orig./HSCH) [de

  2. Technical Risk Identification at Program Inception

    Science.gov (United States)

    2014-04-20

    risks include the probabilistic sum of all of the constituent elements. Aggregation is subjective, and typically not statistical or mathematical ...insure and how much to charge. The system creates groupings of vehicles and driver actuarial classes based on the following classifications...Coverage type. • Classifications, such as age, are further broken into actuarial classes, e.g., 21 to 24 year olds. Supply Chain Risk Identification There

  3. Risk-based technical specifications program: Site interview results

    International Nuclear Information System (INIS)

    Andre, G.R.; Baker, A.J.; Johnson, R.L.

    1991-08-01

    The Electric Power Research Institute and Pacific Gas and Electric Company are sponsoring a program directed at improving Technical Specifications using risk-based methods. The major objectives of the program are to develop risk-based approaches to improve Technical Specifications and to develop an Interactive Risk Advisor (IRA) prototype. The IRA is envisioned as an interactive system that is available to plant personnel to assist in controlling plant operation. Use of an IRA is viewed as a method to improve plant availability while maintaining or improving plant safety. In support of the program, interviews were conducted at several PWR and BWR plant sites, to elicit opinions and information concerning risk-based approaches to Technical Specifications and IRA requirements. This report presents the results of these interviews, including the functional requirements of an IRA. 2 refs., 6 figs., 2 tabs

  4. Methodology for risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Vesely, W.E.; Gaertner, J.P.; Wagner, D.P.

    1985-01-01

    Part of the effort by EPRI to apply probabilistic risk assessment methods and results to the solution of utility problems involves the investigation of methods for risk-based analysis of technical specifications. The culmination of this investigation is the SOCRATES computer code developed by Battelle's Columbus Laboratories to assist in the evaluation of technical specifications of nuclear power plants. The program is designed to use information found in PRAs to re-evaluate risk for changes in component allowed outage times (AOTs) and surveillance test intervals (STIs). The SOCRATES program is a unique and important tool for technical specification evaluations. The detailed component unavailability model allows a detailed analysis of AOT and STI contributions to risk. Explicit equations allow fast and inexpensive calculations. Because the code is designed to accept ranges of parameters and to save results of calculations that do not change during the analysis, sensitivity studies are efficiently performed and results are clearly displayed

  5. Risk impact of BWR technical specifications requirements during shutdown

    International Nuclear Information System (INIS)

    Staple, B.D.; Kirk, H.K.; Yakle, J.

    1994-10-01

    This report presents an application of probabilistic models and risk based criteria for determining the risk impact of the Limiting Conditions of Operations (LCOs) in the Technical Specifications (TSs) of a boiling water reactor during shutdown. This analysis studied the risk impact of the current requirements of Allowed Outage Times (AOTs) and Surveillance Test Intervals (STIs) in eight Plant Operational States (POSs) which encompass power operations, shutdown, and refueling. This report also discusses insights concerning TS action statements

  6. Selection of technical risk responses for efficient contingencies

    Energy Technology Data Exchange (ETDEWEB)

    Kujawski, Edouard

    2002-02-28

    The primary goal of good project risk management should be to successfully deliver projects for the lowest cost at an acceptable level of risk. This requires the systematic development and implementation of a set of Risk Response Actions (RRA) that achieves the lowest total project cost for a given probability of success while meeting technical performance and schedule. We refer to this set as the ''efficient RRA set''. This work presents a practical and mathematically sound approach for determining the efficient RRA set. It builds on some of Markowitz's portfolio selection principles and introduces several conceptual and modeling differences to properly treat project technical risks. The set of RRAs is treated as whole and not just individual risks. The efficient RRA set is determined based on ''Outcome Cost Vs Probability of Success''. The risks and RRAs are characterized using scenarios, decision trees, and cumulative probability distributions. The analysis provides information that enables decision-makers to select the efficient RRA set that explicitly takes their attitude toward project risk into account. Decision-makers should find it both useful and practical for sound decision-making under uncertainty/risk and efficiently optimizing project success. The computations are readily performed using commercially available Monte Carlo simulation tools. The approach is detailed using a realistic but simplified case of a project with two technical risks.

  7. Definition of technical risks in terms of law

    International Nuclear Information System (INIS)

    Rossnagel, A.

    1986-01-01

    The legal system has to acknowledge that complete absence of risk is unattainable. The core question of the law governing technological issues therefore is: How safe is safe enough. The law cannot entirely prohibit technical risks; all it can do is aiming at proper control of unavoidable risks, making a distribution between permissible and non-permissible risks, the consequence of this approach being that a permissible risk cannot be termed to be unlawful once it because a real event. It certainly is a difficult task to find legal rules and provisions that are so perfectly geared to the technical facts and problems that they really allow technology to be controlled, supervised and, if necessary, kept in check along the lines set by the law. The article in hand discusses some proposals as to the formulation of technical risks in terms of law in order to improve existing provisions in the body of law. As an example of what needs improvement, the author discusses the acceptance and acceptability of a hazardous activity, which, the author says, is not guaranteed by the procedure alone that is currently available, namely administrative procedure and licensing procedure. The administrative procedures are said to be insufficient and not complex enough to gather all necessary and relevant information for solving the problems involved. The proposal in the article therefore is to put the question 'How safe is safe enough' to the inhabitants of the region concerned, so that the acceptance of a hazardous activity would depend on a licence issued by the competent authority, and on the approval of the population affected, as certained by a non-compulsory administrative referendum. (orig./HSCH) [de

  8. Promotion of technical harmonisation on risk-based decision making

    International Nuclear Information System (INIS)

    Kirchsteiger, Christian; Cojazzi, Giacomo

    2000-01-01

    The EC-JRC International Workshop on Promotion of Technical Harmonisation on Risk-Based Decision Making, held at Stresa and Ispra, Italy, 22-25 May 2000, was an experts meeting to discuss the possible need of developing an internationally accepted generic 'standard' for risk-based decision making.This paper briefly describes the workshop background, its organisation and summarises its main results and conclusions; it reflects the personal opinions of the authors and in no way commits the European Commission. (author)

  9. Alternative approaches to risk-based technical specifications

    International Nuclear Information System (INIS)

    Atefi, B.; Gallagher, D.W.; Liner, R.T.; Lofgren, E.V.

    1987-01-01

    Four alternative risk-based approaches to Technical Specifications are identified. These are: a Probabilistic Risk Assessment (PRA) oriented approach; a reliability goal-oriented approach; an approach based on configuration control; a data-oriented approach. Based on preliminary results, the PRA-oriented approach, which has been developed further than the other approaches, seems to offer a logical, quantitative basis for setting Allowed Outage Times (AOTs) and Surveillance Test Intervals (STIs) for some plant components and systems. The most attractive feature of this approach is that it directly links the AOTs and STIs with the risk associated with the operation of the plant. This would focus the plant operator's and the regulatory agency's attention on the most risk-significant components of the plant. A series of practical issues related to the level of detail and content of the plant PRAs, requirements for the review of these PRAs, and monitoring cf the plant's performance by the regulatory agency must be resolved before the approach could be implemented. Future efforts will examine the other three approaches and their practicality before firm conclusions are drawn regarding the viability of any of these approaches

  10. Risk based regulation: a convenient concept for legislation and regulation in the field of technical risks?

    International Nuclear Information System (INIS)

    Seiler, J.H.

    1998-01-01

    Legislation and regulation concerning risk activities are traditionally based on deterministic safety measures. This may lead to inefficient results: sometimes the law requires safety measures which are - from an economic viewpoint - not justified because of their poor cost-effectiveness; sometimes it does not require safety measures although they would be very efficient. The risk based regulation approach wants to make the law more efficient and to get more safety at less costs. Legislation and regulation should be based on terms of risk rather than on deterministic rules. Risk should be expressed in quantitative terms and risk regulation should be based on the cost-effectiveness of safety measures. Thus a most efficient (in the sense of the economic analysis of the law) strategy for safety and environmental law could be established. The approach is economically reasonable and theoretically convincing. Its practical implementation however raises a lot of technical and legal questions. The project 'Risk Based Regulation' (1996-1999), sponsored by the Swiss National Fund for Scientific Research, intends to evaluate the practical feasibility of the approach from a technical and a legal view. It contains a general part which describes the risk based regulation approach and its legal and technical questions, case studies which try to practically implement the risk based regulation approach; the case studies are: storage and management of explosives in the army, storage and management of explosives for non-military purposes, safety at work, accident prevention in the non-professional field (mainly road accidents), fire protection, transportation of dangerous goods, waste disposal: traditional waste, waste disposal: radioactive waste, nuclear energy (reactor safety), a synthesis with recommendations for the future legislation and regulation in the field of technical risks. The paper presents the project and its preliminary results. (author)

  11. Impact of shutdown risk on risk-based assessment of technical specifications

    International Nuclear Information System (INIS)

    Deriot, S.

    1992-10-01

    This paper describes the current work performed by the Research and Development Division of EDF concerning risk-based assessment of Operating Technical Specifications (OTS). The current risk-based assessment of OTS at EDF is presented. Then, the level 1 Probabilistic Safety Assessment of unit 3 of the Paluel nuclear power station (called PSA 1300) is described. It is fully computerized and takes into account the risk in shutdown states. A case study is presented. It shows that the fact of considering shutdown risk suggests that the current OTS should be modified

  12. Simulation analysis for integrated evaluation of technical and commercial risk

    International Nuclear Information System (INIS)

    Gutleber, D.S.; Heiberger, E.M.; Morris, T.D.

    1995-01-01

    Decisions to invest in oil- and gasfield acquisitions or participating interests often are based on the perceived ability to enhance the economic value of the underlying asset. A multidisciplinary approach integrating reservoir engineering, operations and drilling, and deal structuring with Monte Carlo simulation modeling can overcome weaknesses of deterministic analysis and significantly enhance investment decisions. This paper discusses the use of spreadsheets and Monte Carlo simulation to generate probabilistic outcomes for key technical and economic parameters for ultimate identification of the economic volatility and value of potential deal concepts for a significant opportunity. The approach differs from a simple risk analysis for an individual well by incorporating detailed, full-field simulations that vary the reservoir parameters, capital and operating cost assumptions, and schedules on timing in the framework of various deal structures

  13. Feasibility assessment of a risk-based approach to technical specifications

    International Nuclear Information System (INIS)

    Atefi, B.; Gallagher, D.W.

    1991-05-01

    To assess the potential use of risk and reliability techniques for improving the effectiveness of the technical specifications to control plant operational risk, the Technical Specifications Branch of the Nuclear Regulatory Commission initiated an effort to identify and evaluate alternative risk-based approaches that could bring greater risk perspective to these requirements. In the first phase four alternative approaches were identified and their characteristics were analyzed. Among these, the risk-based approach to technical specifications is the most promising approach for controlling plant operational risk using technical specifications. The second phase of the study concentrated on detailed characteristics of the real time risk-based approach. It is concluded that a real time risk-based approach to technical specifications has the potential to improve both plant safety and availability. 33 figs., 5 figs., 6 tabs

  14. Risk management: integration of social and technical risk variables into safety assessments of LWR'S

    International Nuclear Information System (INIS)

    Turnage, J.J.; Husseiny, A.A.

    1980-01-01

    A risk management methodology is developed here to formalize the acceptability levels of commercial LWR power plants via the estimation of risk levels acceptable to the public and the integration of such estimates into risk-benefit analysis. Utility theory is used for developing preference models based on value trade-offs among multiple objectives and uncertainties about the impact of alternatives. The method involves reducing the various variables affecting safety acceptability decisions to a single function that provides a metric for acceptability levels. The function accomondates for technical criteria related to design and licensing decisions, as well as public reactions to certain choices

  15. Downsizing Technical Communication Staff: The Risk to Corporate Success.

    Science.gov (United States)

    Smudde, Peter M.

    1993-01-01

    Notes that companies responding to the struggling economy are downsizing staff, including technical communicators. Maintains that such cutbacks affect not only employee confidence and productivity but also product quality, customer satisfaction, and future sales. States that technical communicators' critical knowledge is an asset that companies…

  16. Risk in technical and scientific studies: general introduction to uncertainty management and the concept of risk

    International Nuclear Information System (INIS)

    Apostolakis, G.E.

    2004-01-01

    George Apostolakis (MIT) presented an introduction to the concept of risk and uncertainty management and their use in technical and scientific studies. He noted that Quantitative Risk Assessment (QRA) provides support to the overall treatment of a system as an integrated socio-technical system. Specifically, QRA aims to answer the questions: - What can go wrong (e.g., accident sequences or scenarios)? - How likely are these sequences or scenarios? - What are the consequences of these sequences or scenarios? The Quantitative Risk Assessment deals with two major types of uncertainty. An assessment requires a 'model of the world', and this preferably would be a deterministic model based on underlying processes. In practice, there are uncertainties in this model of the world relating to variability or randomness that cannot be accounted for directly in a deterministic model and that may require a probabilistic or aleatory model. Both deterministic and aleatory models of the world have assumptions and parameters, and there are 'state-of-knowledge' or epistemic uncertainties associated with these. Sensitivity studies or eliciting expert opinion can be used to address the uncertainties in assumptions, and the level of confidence in parameter values can be characterised using probability distributions (pdfs). Overall, the distinction between aleatory and epistemic uncertainties is not always clear, and both can be treated mathematically in the same way. Lessons on safety assessments that can be learnt from experience at nuclear power plants are that beliefs about what is important can be wrong if a risk assessment is not performed. Also, precautionary approaches are not always conservative if failure modes are not identified. Nevertheless, it is important to recognize that uncertainties will remain despite a quantitative risk assessment: e.g., is the scenario list complete, are the models accepted as reasonable, and are parameter probability distributions representative of

  17. Excipient Usage Technical Risk Assessment for Generic Solid Dose Products

    Directory of Open Access Journals (Sweden)

    Ajay Babu Pazhayattil

    2017-09-01

    Full Text Available This paper proposes an assessment methodology for solid dose generic small molecule drug products. It addresses the ‘usage of the excipient’ portion of the trinomial by utilizing the systematic approach of Risk Identification, Risk Analysis and Risk Evaluation as per ICH Q9 Quality Risk Management outlined for developing risk control strategies. The assessment and maintenance of excipient risk profile is essential to minimize any potential risk associated to excipients impacting patients.

  18. Technical Overview of Ecological Risk Assessment - Analysis Phase: Exposure Characterization

    Science.gov (United States)

    Exposure Characterization is the second major component of the analysis phase of a risk assessment. For a pesticide risk assessment, the exposure characterization describes the potential or actual contact of a pesticide with a plant, animal, or media.

  19. Laboratory Biosafety and Biosecurity Risk Assessment Technical Guidance Document

    Energy Technology Data Exchange (ETDEWEB)

    Astuto-Gribble, Lisa M; Caskey, Susan Adele

    2014-07-01

    The purpose of this document is threefold: 1) to describe the laboratory bio safety and biosecurity risk assessment process and its conceptual framework; 2) provide detailed guidance and suggested methodologies on how to conduct a risk assessment; and 3) present some practical risk assessment process strategies using realistic laboratory scenarios.

  20. Risk-based analysis methods applied to nuclear power plant technical specifications

    International Nuclear Information System (INIS)

    Wagner, D.P.; Minton, L.A.; Gaertner, J.P.

    1989-01-01

    A computer-aided methodology and practical applications of risk-based evaluation of technical specifications are described. The methodology, developed for use by the utility industry, is a part of the overall process of improving nuclear power plant technical specifications. The SOCRATES computer program uses the results of a probabilistic risk assessment or a system-level risk analysis to calculate changes in risk due to changes in the surveillance test interval and/or the allowed outage time stated in the technical specification. The computer program can accommodate various testing strategies (such as staggered or simultaneous testing) to allow modeling of component testing as it is carried out at the plant. The methods and computer program are an integral part of a larger decision process aimed at determining benefits from technical specification changes. These benefits can include cost savings to the utilities by reducing forced shutdowns and decreasing labor requirements for test and maintenance activities, with no adverse impacts on risk. The methodology and the SOCRATES computer program have been used extensively toe valuate several actual technical specifications in case studies demonstrating the methods. Summaries of these applications demonstrate the types of results achieved and the usefulness of the risk-based evaluation in improving the technical specifications

  1. A study on decision-making framework for developing risk-informed technical specifications

    International Nuclear Information System (INIS)

    Kim, Beom Seock

    2002-02-01

    The utility and the nuclear research institutes in Korea have conduct research for improving inefficient requirements in technical specifications using the results of probability risk assessments and information associated with risk. However, the guidance for reviewing the improved technical specifications has not been developed. Thus, the objective of this study is to develop a decision-making framework for investigating and reviewing the documents associated with the changes of technical specifications. This work has been done for helping the regulation agency to review the improved technical specifications as well as to make decisions whether the remedy is accepted or not. The contents of this study include: 1. Surveys on Technical Specification regulations in foreign countries as well as those in Korea 2. Surveys on the state- of- the- art methodology for Risk Informed Technical Specifications and their uses in Korea 3. Development of a decision-making framework in both the licensee and the regulation agency position 4. Development and applications of a decision-making framework using Influence Diagrams. The decision-making framework for RITS using Influence Diagrams are developed and applied to an example problem in this study. This work might contribute to developing the risk informed regulation guidance for improving the quality of the current technical specifications

  2. Strategies and deficits in the political treatment of technical risks

    International Nuclear Information System (INIS)

    Dierkes, M.; Thienen, V. von.

    1982-01-01

    To seek approaches for an explanation of the public debate about certain technological risk sources, the authors present an analytical model of risk management techniques. It permits to describe traditional patterns of risk management which frequently are not based on rational categories and pursue a limited number of aims in strategic steps. It concentrates on single major events (catastrophies) and the mistigation of such damage and points out that some risk management techniques related to the utilization of new technologies, unlike the complex traditional forms of risk management, are increasingly aimed at preventing damage occurring in the first place. The chances for a more systematic and acceptable risk management satisfying the growing demands of developing modern technologies are discussed. (orig./HP) [de

  3. Feasibility assessment of a risk-based approach to technical specifications

    International Nuclear Information System (INIS)

    Atefi, B.; Gallagher, D.W.

    1991-05-01

    The first phase of the assessment concentrates on (1) identification of selected risk-based approaches for improving current technical specifications, (2) appraisal of characteristics of each approach, including advantages and disadvantages, and (3) recommendation of one or more approaches that might result in improving current technical specification requirements. The second phase of the work concentrates on assessment of the feasibility of implementation of a pilot program to study detailed characteristics of the preferred approach. The real time risk-based approach was identified as the preferred approach to technical specifications for controlling plant operational risk. There do not appear to be any technical or institutional obstacles to prevent initiation of a pilot program to assess the characteristics and effectiveness of such an approach. 2 tabs

  4. Ethical aspects of the assessment of technical risks

    International Nuclear Information System (INIS)

    Birnbacher, D.

    1991-01-01

    When technology assessment goes over into technology politics, then questions arise which can only be answered in an ethical way. Questions like, which risk strategy has to be the basis for decision-making, and is a decision for or against the development, introduction or maintenance of a certain technology to be based at all on risk assessments? The author considers pure consequentialistic ethics the most plausible option, and does not see a basic difference in a risk-benefit analysis and ethical technology assessment. (DG) [de

  5. Fundamentals of defining and evaluating technical risks and hazards

    International Nuclear Information System (INIS)

    Schoen, G.

    1982-01-01

    This contribution is concerned with discussions of undefined judicial concepts in the area of Safety engineering from the point of view of science and technology. Concepts like risk assessments, including accident probibility predictions are discussed and condensed in the demand: ''Risk must be acceptably low.'' Acceptability of risk is and remains a question of judgement. This judgement must be based on the specific plant involved, and in the final analysis; should be made on the basis of value judgements of all concerned. Measures and criteria for the acceptability of risk have been developed over the years. They will be determined by safety-related of security maximum acceptable values as stated in the appropriate regulations, as well as through licensing, permits, etc. Experience shows that a continuous expansion, based on safety-related research that would include extensive accident analysis, is needed. Should the status of science and technology change, it could become necessary that the measures or criteria for risk assessment would have to change also. (orig./HSCH) [de

  6. Ohio Financial Services and Risk Management. Technical Competency Profile (TCP).

    Science.gov (United States)

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document describes the essential competencies from secondary through post-secondary associate degree programs for a career in financial services and risk management. Ohio College Tech Prep Program standards are described, and a key to profile codes is provided. Sample occupations in this career area, such as financial accountant, loan…

  7. Risk-based configuration control: Application of PSA in improving technical specifications and operational safety

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.

    1992-01-01

    Risk-based configuration control is the management of component configurations using a risk perspective to control risk and assure safety. A configuration, as used here, is a set of component operability statuses that define the state of a nuclear power plant. If the component configurations that have high risk implications do not occur, then the risk from the operation of nuclear power plants would be minimal. The control of component configurations, i.e., the management of component statuses, to minimize the risk from components being unavailable, becomes difficult, because the status of a standby safety system component is often not apparent unless it is tested. Controlling plant configuration from a risk-perspective can provide more direct risk control and also more operational flexibility by allowing looser controls in areas unimportant to risk. Risk-based configuration control approaches can be used to replace parts of nuclear power plant Technical Specifications. With the advances in probabilistic safety assessment (PSA) technology, such approaches to improve Technical Specifications and operational safety are feasible. In this paper, we present an analysis of configuration risks, and a framework for risk-based configuration control to achieve the desired control of risk-significant configurations during plant operation

  8. Evaluation of technical risks in the application of the law

    International Nuclear Information System (INIS)

    Sellner, D.

    1982-01-01

    The problems of definition -''hazard'', ''remaining risk''- will directly lead to the attempt to present the fundamental problems of risk assessment with which the administration of law is confronted. The differing tasks of the executive and the judiciary will also, by their very nature, influence the constellation of problems such as they appear in varying shades. Central to this question in the attempt to practically fulfill the formula of ''measure of practical-minded common sense'', as expressed by the Federal Constitutional Court. The focal point of difficulties centers were around the problems of atomic energy laws. Only in very few cases will if be possible to draw a parallel with the legal provisions governing the licensing of plants subject to the airborne pollution control laws; (BImSchG). (orig./HSCH) [de

  9. Tool-based Risk Assessment of Cloud Infrastructures as Socio-Technical Systems

    DEFF Research Database (Denmark)

    Nidd, Michael; Ivanova, Marieta Georgieva; Probst, Christian W.

    2015-01-01

    Assessing risk in cloud infrastructures is difficult. Typical cloud infrastructures contain potentially thousands of nodes that are highly interconnected and dynamic. Another important component is the set of human actors who get access to data and computing infrastructure. The cloud infrastructure...... exercise for cloud infrastructures using the socio-technical model developed in the TRESPASS project; after showing how to model typical components of a cloud infrastructure, we show how attacks are identified on this model and discuss their connection to risk assessment. The technical part of the model...... is extracted automatically from the configuration of the cloud infrastructure, which is especially important for systems so dynamic and complex....

  10. Implantation of Right Kidneys: Is the Risk of Technical Graft Loss Real?

    Science.gov (United States)

    Khan, Taqi T; Ahmad, Nadeem; Siddique, Kashif; Fourtounas, Konstantinos

    2018-05-01

    The left kidney (LK) is preferred by transplant surgeons, because its vein is always of good length and has a thick wall that enables safe suturing. On the other hand, the right renal vein is generally shorter and thinner walled, and well known for its technical difficulty during venous anastomosis, and can result in graft loss. We examined our living (LD) and deceased donor (DD) recipient data and compared the incidence of technical graft loss and early graft function in right and left kidneys. A cohort of 58 adult and pediatric recipients received an LD or DD kidney between January 2015 and December 2016. The donor and recipient data were retrieved and retrospectively analyzed. Technical graft loss was defined as graft thrombosis within the 7 days after transplant. Right kidneys (RKs) were not a risk factor for technical graft loss, and no graft was lost for technical reasons in either LD or DD transplants. Early graft function in LK and RKs was also comparable in the LD cohort, and there were no LKs in the DD cohort. Based on our data, the use of RKs was not a risk factor for technical graft loss and early graft function was comparable to LKs.

  11. Reduce the risk of stock trading by using technical analysis in iran's ...

    African Journals Online (AJOL)

    Reduce the risk of stock trading by using technical analysis in iran's stock market. ... In this research, efficiency of 50 active companies of Tehran Stock ... With this observation, this research suggest forming a portfolio with zero cost by purchasing ... FAQ's · More about AJOL · AJOL's Partners · Terms and Conditions of Use ...

  12. Sandia Transportation Technical Environmental Information Center and its application to transportation risk analyses

    International Nuclear Information System (INIS)

    Foley, J.T.; Davidson, C.A.; McClure, J.D.

    1978-01-01

    Purpose of this paper is to describe an applied research activity which is fundamental to the conduct of transportation analyses: the collection, analysis, storage, and retrieval of information on the intensities of technical environments. This paper describes the collection system which provides such a service to official researchers in transportation analysis and the applications of this information in the area of risk analysis

  13. Risk assessments for mixtures: technical methods commonly used in the United States

    Science.gov (United States)

    A brief (20 minute) talk on the technical approaches used by EPA and other US agencies to assess risks posed by combined exposures to one or more chemicals. The talk systemically reviews the methodologies (whole-mixtures and component-based approaches) that are or have been used ...

  14. Risk based optimization of technical specifications for operation of nuclear power plants

    International Nuclear Information System (INIS)

    1993-12-01

    The objective of the report is to present an overview of the risk and reliability based approaches (using a probabilistic safety assessment (PSA)) for improving nuclear power plant technical specifications (TS). In that case, it will provide an information base to the Member States in seeking PSA based applications to enhance the effectiveness of their technical specifications. To achieve this objective, the report discusses the basic objectives and reasons for seeking TS changes, the methods, data requirements and uses of different types of applications, and an overview of different applications that have been completed, including detailed descriptions of selected applications. Refs, figs and tabs

  15. Handbook of methods for risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Mankamo, T.; Vesely, W.E.

    1996-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operations (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analyses and engineering judgments. Improvements in these requirements are facilitated by the availability of plant-specific Probabilistic Risk Assessments (PRAs). The US Nuclear Regulatory Commission (USNRC) Office of Research sponsored research to develop systematic, risk-based methods to improve various aspects of TS requirements. A handbook of methods summarizing such risk-based approaches has been completed in 1994. It is expected that this handbook will provide valuable input to NRC's present work in developing guidance for using PRA in risk-informed regulation. The handbook addresses reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), managing plant configurations, and scheduling maintenance

  16. The importance of probabilistic evaluations in connection with risk analyses according to technical safety laws

    International Nuclear Information System (INIS)

    Mathiak, E.

    1984-01-01

    The nuclear energy sector exemplifies the essential importance to be attached to the practical application of probabilistic evaluations (e.g. probabilistic reliability analyses) in connection with the legal risk assessment of technical systems and installations. The study is making use of a triad risk analysis and tries to reconcile the natural science and legal points of view. Without changing the definitions of 'risk' and 'hazard' in the legal sense of their meaning the publication discusses their reconcilation with the laws of natural science, their interpretation and application in view of the latter. (HSCH) [de

  17. Technical challenges in the qualitative ecological risk assessments performed on the Hanford Site operable units

    International Nuclear Information System (INIS)

    Probasco, K.M.

    1994-01-01

    Qualitative Risk Assessments (QRAS) have been selected as the method for providing the risk-driver indications for interim, remedial, and cleanup actions for the Hanford Site operable units' ecological risk assessments. This expedited response action path has been developed for the Hanford Site to facilitate time-critical decisions and generate immediate emergency cleanup actions. Tight budgets and aggressive time schedules are a major factor in the development of the QRA process. The QRA is a quick way to find immediate threats and a good precursor to a full risk assessment. However, numerous technical challenges have been identified with the QRA approach. The QRA approach differs from a baseline risk assessment in several ways. The main differences involve the use of data that have previously been gathered from the site, and the development of a ''bias-for-action'' document that would reveal qualitative risks from the contaminants identified at the operable units. Technical challenges concerning the ecological portion of these QRAs have raised questions about using the ORA for decision-making and may have weakened the validity of its use in the established procedural framework. Challenges involving such issues as the extrapolation of the contaminant data, data validation and screening techniques, receptor selections, and the final risk characterization outcome threaten the feasibility of the QRA as a decision-making tool. This discussion provides insight into resolving technical challenges and may be a ''lessons-learned'' device for those interested in the QRA approach. Ultimately, these challenges are proving to be learning tools for scientists, regulators, and ecologists and are identifying the data gaps and research direction for future ecological baseline risk assessments

  18. Technical methods for a risk-informed, performance-based fire protection program at nuclear power plants

    International Nuclear Information System (INIS)

    Dey, M.K.

    2000-01-01

    This paper presents a technical review and examination of technical methods that are available for developing a risk-informed, performance-based fire protection program at a nuclear plant. The technical methods include 'engineering tools' for examining the fire dynamics of fire protection problems, reliability techniques for establishing an optimal fire protection surveillance program, fire computer codes for analyzing important fire protection safety parameters, and risk-informed approaches that can range from drawing qualitative insights from risk information to quantifying the risk impact of alternative fire protection approaches. Based on this technical review and examination, it is concluded that methods for modeling fires, and reliability and fire probabilistic risk analyses (PRA) are currently available to support the initial implementation of simple risk-informed, performance-based approaches in fire protection programs. (orig.) [de

  19. Information support of monitoring of technical condition of buildings in construction risk area

    Science.gov (United States)

    Skachkova, M. E.; Lepihina, O. Y.; Ignatova, V. V.

    2018-05-01

    The paper presents the results of the research devoted to the development of a model of information support of monitoring buildings technical condition; these buildings are located in the construction risk area. As a result of the visual and instrumental survey, as well as the analysis of existing approaches and techniques, attributive and cartographic databases have been created. These databases allow monitoring defects and damages of buildings located in a 30-meter risk area from the object under construction. The classification of structures and defects of these buildings under survey is presented. The functional capabilities of the developed model and the field of it practical applications are determined.

  20. Safety targets and public risk perceptions in the nuclear field - technical treadmill or institutional responses?

    International Nuclear Information System (INIS)

    Wynne, B.

    1989-01-01

    The context of our treatment of risk perceptions and safety targets is the apparently wide gap between expert judgements of 'objective risks' and public perceptions of those risks. In the nuclear field the latter appear to so multiply the objective risks as seen by the experts, as to make safety targets vastly too strict (whether for routine discharges or for large accidents), thus design extravagantly expensive on any 'rational' criteria. In recent years the nuclear industry has come to terms more with the public perceptions problem, and has accepted that it is legitimate to exercise different, more severe and costly safety standards in the nuclear field if that is what society wants, as it appears to do. Whilst retaining the conviction that this is scientifically unwarranted, the industry has therefore reconciled itself somewhat to more stringent technical safety targets. (author)

  1. Introduction to insurance mathematics technical and financial features of risk transfers

    CERN Document Server

    Olivieri, Annamaria

    2015-01-01

    This second edition expands the first chapters, which focus on the approach to risk management issues discussed in the first edition, to offer readers a better understanding of the risk management process and the relevant quantitative phases. In the following chapters the book examines life insurance, non-life insurance and pension plans, presenting the technical and financial aspects of risk transfers and insurance without the use of complex mathematical tools.   The book is written in a comprehensible style making it easily accessible to advanced undergraduate and graduate students in Economics, Business and Finance, as well as undergraduate students in Mathematics who intend starting on an actuarial qualification path. With the systematic inclusion of practical topics, professionals will find this text useful when working in insurance and pension related areas, where investments, risk analysis and financial reporting play a major role.

  2. Preliminary risk assessment for nuclear waste disposal in space. Volume I. Executive summary of technical report

    International Nuclear Information System (INIS)

    Rice, E.E.; Denning, R.S.; Friedlander, A.L.

    1982-01-01

    Three major conclusions come from this preliminary risk assessment of nuclear waste disposal in space. Preliminary estimates of space disposal risk are low, even with the estimated uncertainty bounds. If calculated mined geologic repository (MGR) release risks remain low, and the EPA requirements continue to be met, then no additional space disposal study effort is warranted. If risks perceived by the public are significant in the acceptance of mined geologic repositories, then consideration of space disposal as an MGR complement is warranted. As a result of this study, the following recommendations are made to NASA and the US DOE: During the continued evaluation of the mined geologic repository risk over the years ahead by DOE, if any significant increase in the calculated health risk is predicted for the MGR, then space disposal should be reevaluated at that time. The risks perceived by the public for the MGR should be evaluated on a broad basis by an independent organization to evaluate acceptance. If, in the future, MGR risks are found to be significant due to some presently unknown technical or social factor, and space disposal is selected as an alternative that may be useful in mitigating the risks, then the following space disposal study activities are recommended: improvement in chemical processing technology for wastes; payload accident response analysis; risk uncertainty analysis for both MGR and space disposal; health risk modeling that includes pathway and dose estimates; space disposal cost modeling; assessment of space disposal perceived (by public) risk benefit; and space systems analysis supporting risk and cost modeling

  3. Technical methods for a risk-informed, performance-based fire protection program at nuclear power plants

    International Nuclear Information System (INIS)

    Dey, M.K.

    1998-01-01

    This paper presents a technical review and examination of technical methods that are available for developing a risk-informed, performance-based fire protection program at a nuclear plant. The technical methods include ''engineering tools'' for examining the fire dynamics of fire protection problems, reliability techniques for establishing an optimal fire protection surveillance program, fire computer codes for analyzing important fire protection safety parameters, and risk-informed approaches that can range from drawing qualitative insights from risk information to quantifying the risk impact of alternative fire protection approaches. Based on this technical review and examination, it is concluded that methods for modeling fires, and reliability and fire PRA analyses are currently available to support the initial implementation of simple risk-informed, performance-based approaches in fire protection programs. (author)

  4. Advanced Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Technical Exchange Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Curtis [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-09-01

    During FY13, the INL developed an advanced SMR PRA framework which has been described in the report Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Detailed Technical Framework Specification, INL/EXT-13-28974 (April 2013). In this framework, the various areas are considered: Probabilistic models to provide information specific to advanced SMRs Representation of specific SMR design issues such as having co-located modules and passive safety features Use of modern open-source and readily available analysis methods Internal and external events resulting in impacts to safety All-hazards considerations Methods to support the identification of design vulnerabilities Mechanistic and probabilistic data needs to support modeling and tools In order to describe this framework more fully and obtain feedback on the proposed approaches, the INL hosted a technical exchange meeting during August 2013. This report describes the outcomes of that meeting.

  5. Handbook of methods for risk-based analysis of technical specification requirements

    International Nuclear Information System (INIS)

    Samanta, P.K.; Vesely, W.E.

    1994-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements were based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while others may not be conducive to safety. Improvements in these requirements are facilitated by the availability of plant specific Probabilistic Safety Assessments (PSAs). The use of risk and reliability-based methods to improve TS requirements has gained wide interest because these methods can: Quantitatively evaluate the risk and justify changes based on objective risk arguments; Provide a defensible basis for these requirements for regulatory applications. The US NRC Office of Research is sponsoring research to develop systematic risk-based methods to improve various aspects of TS requirements. The handbook of methods, which is being prepared, summarizes such risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), defenses against common-cause failures, managing plant configurations, and scheduling maintenances. For each topic, the handbook summarizes methods of analysis and data needs, outlines the insights to be gained, lists additional references, and presents examples of evaluations

  6. Handbook of methods for risk-based analysis of Technical Specification requirements

    International Nuclear Information System (INIS)

    Samanta, P.K.; Vesely, W.E.

    1993-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements were based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while others may not be conducive to safety. Improvements in these requirements are facilitated by the availability of plant specific Probabilistic Safety Assessments (PSAs). The use of risk and reliability-based methods to improve TS requirements has gained wide interest because these methods can: quantitatively evaluate the risk impact and justify changes based on objective risk arguments. Provide a defensible basis for these requirements for regulatory applications. The United States Nuclear Regulatory Commission (USNRC) Office of Research is sponsoring research to develop systematic risk-based methods to improve various aspects of TS requirements. The handbook of methods, which is being prepared, summarizes such risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), defenses against common-cause failures, managing plant configurations, and scheduling maintenances. For each topic, the handbook summarizes methods of analysis and data needs, outlines the insights to be gained, lists additional references, and presents examples of evaluations

  7. New Metrics for Evaluating Technical Benefits and Risks of DGs Increasing Penetration

    DEFF Research Database (Denmark)

    Akbari, Mohammad Amin; Aghaei, Jamshid; Barani, Mostafa

    2017-01-01

    and risks should be qualified and quantified. This paper introduces several probabilistic indices to evaluate the potential operational effects of increasing penetration of renewable DG units such as wind power and photovoltaic on rural distribution network with the aid of evaluating technical benefits...... and risks trade-offs. A probabilistic generation-load model is suggested to calculate these indices which combine a large number of possible operating conditions of renewable DG units with their probabilities. Temporal and annual indices of voltage profile and line flow related attributes such as Interest...... Voltage Rise (IVR), Risky Voltage Rise (RVR), Risky Voltage Down (RVD), Line Loss Reduction (LLR), Line Loss Increment (LLI) and Line overload flow (LOF) are introduced using probability and expected values of their occurrence. Also, to measure the overall interests and risks of installing DG, composite...

  8. A socio-technical, probabilistic risk assessment model for surgical site infections in ambulatory surgery centers.

    Science.gov (United States)

    Bish, Ebru K; El-Amine, Hadi; Steighner, Laura A; Slonim, Anthony D

    2014-10-01

    To understand how structural and process elements may affect the risk for surgical site infections (SSIs) in the ambulatory surgery center (ASC) environment, the researchers employed a tool known as socio-technical probabilistic risk assessment (ST-PRA). ST-PRA is particularly helpful for estimating risks in outcomes that are very rare, such as the risk of SSI in ASCs. Study objectives were to (1) identify the risk factors associated with SSIs resulting from procedures performed at ASCs and (2) design an intervention to mitigate the likelihood of SSIs for the most common risk factors that were identified by the ST-PRA for a particular surgical procedure. ST-PRA was used to study the SSI risk in the ASC setting. Both quantitative and qualitative data sources were utilized, and sensitivity analysis was performed to ensure the robustness of the results. The event entitled "fail to protect the patient effectively" accounted for 51.9% of SSIs in the ambulatory care setting. Critical components of this event included several failure risk points related to skin preparation, antibiotic administration, staff training, proper response to glove punctures during surgery, and adherence to surgical preparation rules related to the wearing of jewelry, watches, and artificial nails. Assuming a 75% reduction in noncompliance on any combination of 2 of these 5 components, the risk for an SSI decreased from 0.0044 to between 0.0027 and 0.0035. An intervention that targeted the 5 major components of the major risk point was proposed, and its implications were discussed.

  9. Technical specifications review of nuclear power plants: a risk-informed evaluation

    International Nuclear Information System (INIS)

    Saldanha, Pedro Luiz da Cruz; Sousa, Anna Leticia; Frutuoso e Melo, Paulo Fernando Ferreira; Duarte, Juliana Pacheco

    2012-01-01

    The use of risk information by a regulatory body as part of an integrated decision making process addresses the way in which risk information is being used as part of an integrated process in making decisions about safety issues at nuclear plants – commonly referred to as risk-informed decision making. The risk-informed approach aims to integrate in a systematic manner quantitative and qualitative, deterministic and probabilistic safety considerations to obtain a balanced decision. Probabilistic Safety Assessment (PSA) is a methodology that can be applied to provide a structured analysis process to evaluate the frequency and consequences of accidents scenarios in nuclear power plants. Technical Specifications (TS) are specifications regarding the characteristics of nuclear power plants (variables, systems or components) of overriding importance to nuclear safety and radiation protection, which is an integral part of plant operation authorization. Limiting Conditions of Operation (LCO) are the minimum levels of performance or capacity or operating system components required for the safe operation of nuclear plants, as defined in technical specifications. The Maintenance Rule (MR) is a requirement established by the U. S. Nuclear Regulatory Commission (NRC) to check the effectiveness of maintenance carried out in nuclear plants, and plant configuration control. The control of plant configuration is necessary to verify the impact of the maintenance of a safety device out of service on plant safety. The Electric Power Research Institute (EPRI) has assessed the role of probabilistic safety analysis in the regulation of nuclear power plants with the following objectives: a) to provide utilities with an approach for developing and implementing nuclear power station risk-managed technical specification programs; and b) to complement and supplement existing successful configuration risk management applications such as MR. This paper focuses on the evaluation of EPRI

  10. Assessment of technical risks and R and D requirements for a magnetic confinement fusion fuel system. Final report

    International Nuclear Information System (INIS)

    DeFreece, D.A.

    1983-11-01

    This report documents a specific use and results of a novel technique for assessing the technical risks associated with the hardware development of a possible future commercial fusion power plant fuel system. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications. A technical risk assessment is the quantification of this risk. This Technical Risk Assessment (TRA) methodology was applied to a deuterium-tritium fuel system for a magnetic-confinement fusion power plant. The fuel system is defined to support a generic commercial reactor with at least two viable options for each critical subsystem. Each subsystem option is defined in detail including nominal performance requirements and subsystem interfaces. Subsystem experts were canvassed to obtain values for past, present and future technical performance parameters for each of the subsystem options. These forecasts are presented as probabilities of achieving given levels of performance in specific time periods for assumed funding scenarios. Several funding scenarios were examined to discern whether performance limitations are caused by funding or technology. A computerized Fuel System simulation is described which uses these subsystem performance parameter forecasts as inputs

  11. Postclosure risks at the proposed Yucca Mountain repository: A review of methodological and technical issues

    International Nuclear Information System (INIS)

    Emel, J.; Kasperson, R.E.; Goble, R.; Renn, O.

    1988-06-01

    Accordingly, the first section of the report provides an overview and critique of the risk analysis methodology proposed by the US Department of Energy (DOE 1988) in the Draft Site Characterization Plan (SCP) and related documents. The second section addresses specific technical problems associated with the site. Each section considers the significance or implications of the issues for the successful long-term isolation of radioactive wastes from the biosphere. We conclude with overall observations on the adequacy of current understandings and approaches in the waste disposal program and implications for the State of Nevada

  12. Procedures for controlling the risks of reliability, safety, and availability of technical systems

    International Nuclear Information System (INIS)

    1987-01-01

    The reference book covers four sections. Apart from the fundamental aspects of the reliability problem, of risk and safety and the relevant criteria with regard to reliability, the material presented explains reliability in terms of maintenance, logistics and availability, and presents procedures for reliability assessment and determination of factors influencing the reliability, together with suggestions for systems technical integration. The reliability assessment consists of diagnostic and prognostic analyses. The section on factors influencing reliability discusses aspects of organisational structures, programme planning and control, and critical activities. (DG) [de

  13. Risk perception of various technical options in the field of radioactive waste management

    International Nuclear Information System (INIS)

    Cameron, F.X.

    1996-01-01

    The author's group had a wide ranging discussion of risk and, at the very end of the discussion got to the question that was posed to them, which is that of risk perception of various technical options in the field of radioactive waste management. Some of the points that were made in this discussion is a reality that the group, as decision-makers, have to deal with, and it has to be treated as a reality. Secondly, the scientist looks at risk from the classic definition of ''probability times consequences'', but the public only looks at the consequences side of the equation, and too often the probability of something happening is treated as a probability of one that it will actually happen. A third problem that was identified in this area is that often the efforts to make the disposal of waste safer may contribute, in the public mind, to the fact that the risk is even more hazardous. And the last problem is that people do not trust what a decision maker is saying when he talks about the fact that there is little probability of something happening. The group then went on to a discussion of how he should try to treat risk perception. One point that was made is that voluntary acceptance of a risk is important. A second point that was made on how to deal with risk perception problems is that the group could try to put the risk of radioactive waste disposal in the perspective of other risks to society, from the chemical industry for instance. The group also talked about the possibility of putting the benefits in perspective for people. Another point was that the group should have different communications strategies for different audiences. But, the more the public is involved in the decision making process, the more comfortable they are going to be with the risk, and the more consistent the perception of risk may be with the scientific definition thereof. In terms of new technologies, new innovations on the generation and management of waste, although these may actually

  14. Technical risk audit method (tram): development and application to the auditing of major hazard sites

    International Nuclear Information System (INIS)

    Maddison, T.; Kirk, P.; Stansfield, R.

    1998-01-01

    The Technical Risk Audit Method (TRAM) has been developed by the UK Health and Safety Executive (UK HSE) as a risk-based auditing and inspection tool for application to Major Hazard process plant covered by the Seveso-I/Seveso-II directives. The objective of TRAM is to provide a framework in which plant inspection or audit can be undertaken and results collated. TRAM comprises a paper audit procedure and a software tool which is used to analyse the results. TRAM includes a semi-quantitative risk model, which may be used to rank risks both within and between similar facilities, using qualitative data collected during the inspection. The results of this qualitative analysis may be used to identify where inspector resources would be best deployed. To date, TRAM has been applied to a number of LPG storage and processing facilities in the UK, and the lessons learnt are being used to develop a robust version suitable for use by inspectors. The methodology will be made consistent with the risk model included in IEC 61508 'Functional safety of electrical/electronic/programmable electronic safety-related systems' to permit its application to a wide range of process plant and other hazardous facilities. (authors)

  15. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  16. Goals and activities of the JICA technical cooperation project on reduction of seismic risk in Romania

    International Nuclear Information System (INIS)

    Vacareanu, R.; Kato, H.

    2007-01-01

    Japan International Cooperation Agency (JICA) Technical Cooperation Project on Reduction of Seismic Risk for Buildings and Structures started in Romania on October 1, 2002. The aim of the Project is to strengthen the capacity of earthquake disaster related activities in Romania. The Project approval is the result of four years of intensive efforts made by professionals from Technical University of Civil Engineering Bucharest (UTCB), Ministry of Transport, Constructions and Tourism (MTCT), Romania, National Building Research Institute (INCERC) Bucharest, JICA, Building Research Institute (BRI), Tsukuba, and National Institute for Land, Infrastructure and Management (NILIM), Tsukuba, Japan. The duration of the Project is five years. The implementing agency is the National Center for Seismic Risk Reduction (NCSRR) as a public institution of national interest under MTCT. The activities are carried out by NCSRR in partnership with UTCB and INCERC. During the Project period, 29 young Romanian engineers were trained in Japan, 7 Japanese experts and 37 Japanese experts worked for long-term and short-term, respectively in Romania. Equipment for seismic instrumentation, dynamic characterization of soil and structural testing rising up approximately to 260 million yens (i.e. 2.17 million USD) were donated by JICA to Romania, through NCSRR. The total cost of the Project is roughly 7 million USD. The paper describes the main activities and results of the Project until the JICA Final Evaluation Mission (March 2007). (authors)

  17. The role of risk perception and technical information in scientific debates over nuclear waste storage

    International Nuclear Information System (INIS)

    Jenkins-Smith, Hank C.; Silva, Carol L.

    1998-01-01

    This article examines how members of the lay public factor risk perceptions, trust and technical information from differing scientific sources into policy judgements about potentially hazardous facilities. Focusing on radwaste storage repositories, we examine how members of the public filter new information about potential hazards through risk perceptions, and adjust their own beliefs about risks in light of that information. Scientists play a large (and increasing) role in public policy debates concerning nuclear waste issues, in which public perceptions of human health and environmental risks often differ substantially from scientific consensus about those risks. Public concerns and uncertainties are compounded when scientists from competing groups (government agencies, scientific institutions, industries, and interest groups) make different claims about the likely health and environmental consequences of different policy options. We show the processes by which the public receive and process scientific information about nuclear waste management risks using data taken from interviews with 1800 randomly selected individuals (1200 in New Mexico, and 600 nationwide). Among the more important findings are: (1) members of the public are able to make quite reasonable estimates about what kinds of positions on the risks of nuclear waste disposal will be taken by scientists from differing organizations (e.g. scientists from environmental groups, government agencies, or the nuclear industry); (2) in assessing the credibility of scientific claims, members of the public place great emphasis on the independence of the scientists from those who fund the research; and (3) prior expectations about the positions (or expected biases) of scientists from different organizations substantially affects the ways in which members of the public weigh (and utilize) information that comes from these scientists

  18. 76 FR 2369 - Priorities for Addressing Risks to the Reliability of the Bulk-Power System; Notice of Technical...

    Science.gov (United States)

    2011-01-13

    ... Addressing Risks to the Reliability of the Bulk- Power System; Notice of Technical Conference December 16.... The purpose of the conference is to discuss policy issues related to reliability of the Bulk-Power System, including priorities for addressing risks to reliability. The agenda for this conference will be...

  19. Technical and governance considerations for advanced metering infrastructure/smart meters: Technology, security, uncertainty, costs, benefits, and risks

    International Nuclear Information System (INIS)

    McHenry, Mark P.

    2013-01-01

    The fundamental role of policymakers when considering Advanced Metering Infrastructure (AMI), or ‘smart meters for energy and water infrastructure is to investigate a broad range of complex interrelated issues. These include alternative technical and non-technical options and deployment needs, the cost and benefits of the infrastructure (risks and mitigation measures), and the impact of a number of stakeholders: consumers, distributors, retailers, competitive market operators, competing technology companies, etc. The scale and number of potential variables in the AMI space is an almost unprecedented challenge to policymakers, with the anticipation of new ancillary products and services, associated market contestability, related regulatory and policy amendments, and the adequacy of consumer protection, education, and safety considerations requiring utmost due-diligence. Embarking on AMI investment entails significant technical, implementation, and strategic risk for governments and administering bodies, and an active effort is required to ensure AMI governance and planning maximises the potential benefits, and minimise uncertainties, costs, and risks to stakeholders. This work seeks to clarify AMI fundamentals and discusses the technical and related governance considerations from a dispassionate perspective, yet acknowledges many stakeholders tend to dichotomise debate, and obfuscate both advantages and benefits, and the converse. - Highlights: • AMI presents an almost unprecedented technical and governance policy challenge. • AMI enables vertical integration of electricity, gas, water, IT, and telco entities • AMI investments involve major technical, implementation, and strategic decisions. • Adequacy of consumer education, safety, privacy, and protection is paramount. • Policy must maximise AMI benefits and minimise uncertainties, costs, and risks

  20. Handbook of methods for risk-based analyses of technical specifications

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Mankamo, T.; Vesely, W.E.

    1994-12-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. The US Nuclear Regulatory Commission (USNRC) Office of Research has sponsored research to develop systematic risk-based methods to improve various aspects of TS requirements. This handbook summarizes these risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), scheduled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), and management of plant configurations resulting from outages of systems, or components. For each topic, the handbook summarizes analytic methods with data needs, outlines the insights to be gained, lists additional references, and gives examples of evaluations

  1. Handbook of methods for risk-based analyses of technical specifications

    Energy Technology Data Exchange (ETDEWEB)

    Samanta, P.K.; Kim, I.S. [Brookhaven National Lab., Upton, NY (United States); Mankamo, T. [Avaplan Oy, Espoo (Finland); Vesely, W.E. [Science Applications International Corp., Dublin, OH (United States)

    1994-12-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. The US Nuclear Regulatory Commission (USNRC) Office of Research has sponsored research to develop systematic risk-based methods to improve various aspects of TS requirements. This handbook summarizes these risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), scheduled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), and management of plant configurations resulting from outages of systems, or components. For each topic, the handbook summarizes analytic methods with data needs, outlines the insights to be gained, lists additional references, and gives examples of evaluations.

  2. Data development technical support document for the aircraft crash risk analysis methodology (ACRAM) standard

    International Nuclear Information System (INIS)

    Kimura, C.Y.; Glaser, R.E.; Mensing, R.W.; Lin, T.; Haley, T.A.; Barto, A.B.; Stutzke, M.A.

    1996-01-01

    The Aircraft Crash Risk Analysis Methodology (ACRAM) Panel has been formed by the US Department of Energy Office of Defense Programs (DOE/DP) for the purpose of developing a standard methodology for determining the risk from aircraft crashes onto DOE ground facilities. In order to accomplish this goal, the ACRAM panel has been divided into four teams, the data development team, the model evaluation team, the structural analysis team, and the consequence team. Each team, consisting of at least one member of the ACRAM plus additional DOE and DOE contractor personnel, specializes in the development of the methodology assigned to that team. This report documents the work performed by the data development team and provides the technical basis for the data used by the ACRAM Standard for determining the aircraft crash frequency. This report should be used to provide the generic data needed to calculate the aircraft crash frequency into the facility under consideration as part of the process for determining the aircraft crash risk to ground facilities as given by the DOE Standard Aircraft Crash Risk Assessment Methodology (ACRAM). Some broad guidance is presented on how to obtain the needed site-specific and facility specific data but this data is not provided by this document

  3. Technical Needs for Enhancing Risk Monitors with Equipment Condition Assessment for Advanced Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Coble, Jamie B.; Coles, Garill A.; Ramuhalli, Pradeep; Meyer, Ryan M.; Berglin, Eric J.; Wootan, David W.; Mitchell, Mark R.

    2013-04-04

    requirements, including the need to operate in different coolant environments, higher operating temperatures, and longer operating cycles between planned refueling and maintenance outages. These features, along with the relative lack of operating experience for some of the proposed advanced designs, may limit the ability to estimate event probability and component POF with a high degree of certainty. Incorporating real-time estimates of component POF may compensate for a relative lack of established knowledge about the long-term component behavior and improve operational and maintenance planning and optimization. The particular eccentricities of advanced reactors and small modular reactors provide unique challenges and needs for advanced instrumentation, control, and human-machine interface (ICHMI) techniques such as enhanced risk monitors (ERM) in aSMRs. Several features of aSMR designs increase the need for accurate characterization of the real-time risk during operation and maintenance activities. A number of technical gaps in realizing ERM exist, and these gaps are largely independent of the specific reactor technology. As a result, the development of a framework for ERM would enable greater situational awareness regardless of the specific class of reactor technology. A set of research tasks are identified in a preliminary research plan to enable the development, testing, and demonstration of such a framework. Although some aspects of aSMRs, such as specific operational characteristics, will vary and are not now completely defined, the proposed framework is expected to be relevant regardless of such uncertainty. The development of an ERM framework will provide one of the key technical developments necessary to ensure the economic viability of aSMRs.

  4. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  5. Telemetry system for monitoring the ECG for patients with high cardiovascular risk. Main design requirements and technical solutions

    International Nuclear Information System (INIS)

    Rodriguez, J; Meissimilly, G; Berovides, JD

    2005-01-01

    In this paper the main design requirements concerning the setting up of a telemetry ECG monitoring system are presented. The design's most important technical solutions as well as some details are also discussed. This system is intended to provide skilled medical assistance during the cardiac rehabilitation of both asymptomatic and high risk coronary patients

  6. Economic risk-based analysis: Effect of technical and market price uncertainties on the production of glycerol-based isobutanol

    DEFF Research Database (Denmark)

    Loureiro da Costa Lira Gargalo, Carina; Gernaey, Krist; Sin, Gürkan

    2016-01-01

    to propagate the market price and technical uncertainties to the economic indicator calculations and to quantify the respective economic risk. The results clearly indicated that under the given market price uncertainties, the probability of obtaining a negative NPV is 0.95. This is a very high probability...

  7. Risk-based technical specifications: Development and application of an approach to the generation of a plant specific real-time risk model

    International Nuclear Information System (INIS)

    Puglia, B.; Gallagher, D.; Amico, P.; Atefi, B.

    1992-10-01

    This report describes a process developed to convert an existing PRA into a model amenable to real time, risk-based technical specification calculations. In earlier studies (culminating in NUREG/CR-5742), several risk-based approaches to technical specification were evaluated. A real-time approach using a plant specific PRA capable of modeling plant configurations as they change was identified as the most comprehensive approach to control plant risk. A master fault tree logic model representative of-all of the core damage sequences was developed. Portions of the system fault trees were modularized and supercomponents comprised of component failures with similar effects were developed to reduce the size of the model and, quantification times. Modifications to the master fault tree logic were made to properly model the effect of maintenance and recovery actions. Fault trees representing several actuation systems not modeled in detail in the existing PRA were added to the master fault tree logic. This process was applied to the Surry NUREG-1150 Level 1 PRA. The master logic mode was confirmed. The model was then used to evaluate frequency associated with several plant configurations using the IRRAS code. For all cases analyzed computational time was less than three minutes. This document Volume 2, contains appendices A, B, and C. These provide, respectively: Surry Technical Specifications Model Database, Surry Technical Specifications Model, and a list of supercomponents used in the Surry Technical Specifications Model

  8. Factors increasing the risk of inactivity among administrative, technical, and manual workers in Warszawa public institutions.

    Science.gov (United States)

    Biernat, Elżbieta

    2015-01-01

    The research aims to assess the level of physical activity among administrative, technical, and manual workers employed in Warszawa public institutions and to analyze the factors that increase the risk of failing to meet World Health Organization (WHO) recommendations. The study comprised 373 employees of randomly selected institutions. A short version of International Physical Activity Questionnaire (IPAQ) was applied. The correlation between the mean values of duration, days, MET-min/week of efforts, gender, and type of work was analyzed using the Tukey's honest significant difference (HSD) test, while the correlation between the level of physical activity and the socio-demographic characteristics was assessed with the Chi2 test. The strength of the relationship between socio-demographic characteristics and fulfilment of WHO standards was expressed by the odds ratio (OR) and 95% confidence interval (95% CI). The significance level was p = 0.05. High levels of physical activity were declared by 41.8% of the manual workers, 14.7% of the administration staff, and 7.3% of the technicians; 19%, 31.5% and 54.5%, respectively, reported low levels of physical activity. Factors determining the fulfilment of the WHO recommendations include: the nature of work (p = 0.003), education (p = 0.004), and income (p = 0.003). The risk of being inactive nearly doubles in the case of administration staff (31.5%) and increases more than 4 times in the case of technicians (54.5%). Respondents with secondary school education (31.6%) are exposed to a 3-fold higher risk of inactivity, while in respondents with higher education (37.2%), the level of the risk is 4-fold higher. Compared to those in the highest income group (23.4%), people who earn less (34.1%) are inactive almost twice as often. Urgent intervention is necessary in all studied groups: increased energy expenditure for recreation and locomotion, educational offers of employers to promote healthy lifestyle, management of

  9. A Socio-Technical Exploration for Reducing & Mitigating the Risk of Retained Foreign Objects

    Science.gov (United States)

    Corrigan, Siobhán; Kay, Alison; O’Byrne, Katie; Slattery, Dubhfeasa; Sheehan, Sharon; McDonald, Nick; Smyth, David; Mealy, Ken; Cromie, Sam

    2018-01-01

    A Retained Foreign Object (RFO) is a fairly infrequent but serious adverse event. An accurate rate of RFOs is difficult to establish due to underreporting but it has been estimated that incidences range between 1/1000 and 1/19,000 procedures. The cost of a RFO incident may be substantial and three-fold: (i) the cost to the patient of physical and/or psychological harm; (ii) the reputational cost to an institution and/or healthcare provider; and (iii) the financial cost to the taxpayer in the event of a legal claim. This Health Research Board-funded project aims to analyse and understand the problem of RFOs in surgical and maternity settings in Ireland and develop hospital-specific foreign object management processes and implementation roadmaps. This project will deploy an integrated evidence-based assessment methodology for social-technical modelling (Supply, Context, Organising, Process & Effects/ SCOPE Analysis Cube) and bow tie methodologies that focuses on managing the risks in effectively implementing and sustaining change. It comprises a multi-phase research approach that involves active and ongoing collaboration with clinical and other healthcare staff through each phase of the research. The specific objective of this paper is to present the methodological approach and outline the potential to produce generalisable results which could be applied to other health-related issues. PMID:29642646

  10. Technical benefit and risk analysis on cement clinkering process with compact internal burning of carbon

    International Nuclear Information System (INIS)

    Chen, Hanmin

    2015-01-01

    This article demonstrates the potential technical benefit and risk for cement clinkering process with compact internal burning of carbon, a laboratory-phase developing technique, from 9 aspects, including the heat consumption of clinkering and exhaust heat utilization, clinker quality, adaptability to alternative fuels, the disposal ability of industrial offal and civil garbage, adaptability to the raw materials and fuels with high content of chlorine, sulphur and alkali, the feasibility of process scale up, the briquetting process of the coal-containing cement raw meal pellet, NO x emission and the capital cost and benefit of conversion project. It is concluded that it will be able to replace the modern precalciner rotary kiln process and to become the main stream technique of cement clinkering process in low carbon economy times. - Highlights: • Compact internal burning of carbon enables cement shaft kiln to run stably. • Compact internal burning of carbon enables cement shaft kiln to scale up. • New process triples energy efficiency with excellent environmental performance. • It will be able to compete with and replace the existing precalciner kiln process. • It will become the mainstream clinkering process in low carbon economy

  11. The socio-technical setting of economic stakes of global environment risks

    International Nuclear Information System (INIS)

    Salles, J.M.

    1993-01-01

    For policy-making for fighting acid rain, protecting the ozone layer and initiating action to prevent global climate change related to the growth of the greenhouse effect, the economic approach requires more precise consideration of how the economic stakes attached to these threats have been built up by their social actors. Global environmental risks (GER) are not directly perceivable nor can they be easily related to any activity or phenomena at local level (in time or space). There are scientific controversies about the reality of damage and establishing credible responsibility links. Moreover, these controversies are brought to media and social debate before any scientific clarification is possible. The media representations of GER emphasize the fact they could have catastrophic and irreversible consequences. So, the social demand for public action becomes very heavy when delay, possibly of several years between the causes and consequences of global environmental change, prevents any rapid clarification in the controversies. These difficulties have led to the evolution of a decision process in several steps: firstly, an international convention is prepared in which signatory countries commit themselves to cooperate and to take action; secondly, one or several agreements are signed with clear technical objectives and a timetable for implementations. 23 refs

  12. Genome privacy: challenges, technical approaches to mitigate risk, and ethical considerations in the United States

    Science.gov (United States)

    Wang, Shuang; Jiang, Xiaoqian; Singh, Siddharth; Marmor, Rebecca; Bonomi, Luca; Fox, Dov; Dow, Michelle; Ohno-Machado, Lucila

    2016-01-01

    Accessing and integrating human genomic data with phenotypes is important for biomedical research. Making genomic data accessible for research purposes, however, must be handled carefully to avoid leakage of sensitive individual information to unauthorized parties and improper use of data. In this article, we focus on data sharing within the scope of data accessibility for research. Current common practices to gain biomedical data access are strictly rule based, without a clear and quantitative measurement of the risk of privacy breaches. In addition, several types of studies require privacy-preserving linkage of genotype and phenotype information across different locations (e.g., genotypes stored in a sequencing facility and phenotypes stored in an electronic health record) to accelerate discoveries. The computer science community has developed a spectrum of techniques for data privacy and confidentiality protection, many of which have yet to be tested on real-world problems. In this article, we discuss clinical, technical, and ethical aspects of genome data privacy and confidentiality in the United States, as well as potential solutions for privacy-preserving genotype–phenotype linkage in biomedical research. PMID:27681358

  13. A Socio-Technical Exploration for Reducing & Mitigating the Risk of Retained Foreign Objects

    Directory of Open Access Journals (Sweden)

    Siobhán Corrigan

    2018-04-01

    Full Text Available A Retained Foreign Object (RFO is a fairly infrequent but serious adverse event. An accurate rate of RFOs is difficult to establish due to underreporting but it has been estimated that incidences range between 1/1000 and 1/19,000 procedures. The cost of a RFO incident may be substantial and three-fold: (i the cost to the patient of physical and/or psychological harm; (ii the reputational cost to an institution and/or healthcare provider; and (iii the financial cost to the taxpayer in the event of a legal claim. This Health Research Board-funded project aims to analyse and understand the problem of RFOs in surgical and maternity settings in Ireland and develop hospital-specific foreign object management processes and implementation roadmaps. This project will deploy an integrated evidence-based assessment methodology for social-technical modelling (Supply, Context, Organising, Process & Effects/ SCOPE Analysis Cube and bow tie methodologies that focuses on managing the risks in effectively implementing and sustaining change. It comprises a multi-phase research approach that involves active and ongoing collaboration with clinical and other healthcare staff through each phase of the research. The specific objective of this paper is to present the methodological approach and outline the potential to produce generalisable results which could be applied to other health-related issues.

  14. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    International Nuclear Information System (INIS)

    Vierow, Karen; Aldemir, Tunc

    2009-01-01

    The project entitled, 'Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors', was conducted as a DOE NERI project collaboration between Texas A and M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  15. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Vierow, Karen; Aldemir, Tunc

    2009-09-10

    The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  16. At-Risk Learner Preference in Engineering/Technical Graphics: An Exploratory Study

    Science.gov (United States)

    Ernst, Jeremy V.

    2011-01-01

    This exploratory study investigated learner preferences of secondary Career and Technical Education (CTE) Engineering/Technical Graphics students using the VARK Questionnaire. The VARK Questionnaire is an instrument that assists in determining students' dominant preferred learning styles, whether visual, aural, reading, or kinesthetic. This study…

  17. Guidance to Risk-Informed Evaluation of Technical Specifications using PSA

    International Nuclear Information System (INIS)

    Baeckstroem, Ola; Haeggstroem, Anna; Maennistoe, Ilkka

    2010-04-01

    This report presents guidance for evaluation of Technical Specification conditions with PSA. It covers quality in PSA, how to verify that the PSA model is sufficiently robust and sufficiently complete and general requirements on methods. Acceptance criteria for evaluation of changes in the TS conditions are presented. As the probabilistic safety assessment (PSA) has developed over the years, it has demonstrated to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. and in that way making the PSAs as well as the decision tools better. This also means that it will be possible to take credit for safety system overcapacity as well as inherent safety features and strength of non-safety classed systems. However, PSA is only one of the tools that shall be used in an evaluation process of TS changes (strengthening/relaxation). PSA is an excellent tool to be used to verify the importance, and thereby possibly relaxation, of TS requirements. But, since PSA is only one tool in the evaluation, it is not sufficient in itself for defining which equipment that shall or shall not have TS requirements. The purpose of this guidance document is to provide general requirements, requirements on methods and acceptance criteria on risk-informed evaluation of TS changes based on PSA. The purpose is not to provide a single solution. As part of the review of the TS conditions this guidance specify requirements on: - Quality verification of the PSA model; - Verification that the PSA model is sufficiently robust with regard to SSCs for which requirements both are and are not defined by the TS; - Verification that the SSCs, for which TS demands are to be evaluated, are modelled in a sufficient manner; - Methods for performing the evaluation; - Which evaluation criteria that shall be used (and how that is verified to be correct); - Acceptance criteria: This guidance also briefly discusses the documentation of the analysis of the TS changes. This guidance

  18. Guidance to risk-informed evaluation of technical specifications using PSA

    International Nuclear Information System (INIS)

    Baeckstroem, O.; Haeggstroem, A.; Maennistoe, I.

    2010-10-01

    This report presents guidance for evaluation of Technical Specification conditions with PSA. It covers quality in PSA, how to verify that the PSA model is sufficiently robust and sufficiently complete and general requirements on methods. Acceptance criteria for evaluation of changes in the TS conditions are presented. As the probabilistic safety assessment (PSA) has developed over the years, it has demonstrated to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. and in that way making the PSAs as well as the decision tools better. This also means that it will be possible to take credit for safety system overcapacity as well as inherent safety features and strength of non-safety classed systems. However, PSA is only one of the tools that shall be used in an evaluation process of TS changes (strengthening/relaxation). PSA is an excellent tool to be used to verify the importance, and thereby possibly relaxation, of TS requirements. But, since PSA is only one tool in the evaluation, it is not sufficient in itself for defining which equipment that shall or shall not have TS requirements. The purpose of this guidance document is to provide general requirements, requirements on methods and acceptance criteria on risk-informed evaluation of TS changes based on PSA. The purpose is not to provide a single solution. As part of the review of the TS conditions this guidance specify requirements on: - Quality verification of the PSA model; - Verification that the PSA model is sufficiently robust with regard to SSCs for which requirements both are and are not defined by the TS; - Verification that the SSCs, for which TS demands are to be evaluated, are modelled in a sufficient manner; - Methods for performing the evaluation; - Which evaluation criteria that shall be used (and how that is verified to be correct); - Acceptance criteria: This guidance also briefly discusses the documentation of the analysis of the TS changes. This guidance

  19. Guidance to risk-informed evaluation of technical specifications using PSA

    Energy Technology Data Exchange (ETDEWEB)

    Baeckstroem, O.; Haeggstroem, A. (Scandpower AB, Stockholm (Sweden)); Maennistoe, I. (VTT, Helsingfors (Finland))

    2010-04-15

    This report presents guidance for evaluation of Technical Specification conditions with PSA. It covers quality in PSA, how to verify that the PSA model is sufficiently robust and sufficiently complete and general requirements on methods. Acceptance criteria for evaluation of changes in the TS conditions are presented. As the probabilistic safety assessment (PSA) has developed over the years, it has demonstrated to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. and in that way making the PSAs as well as the decision tools better. This also means that it will be possible to take credit for safety system overcapacity as well as inherent safety features and strength of non-safety classed systems. However, PSA is only one of the tools that shall be used in an evaluation process of TS changes (strengthening/relaxation). PSA is an excellent tool to be used to verify the importance, and thereby possibly relaxation, of TS requirements. But, since PSA is only one tool in the evaluation, it is not sufficient in itself for defining which equipment that shall or shall not have TS requirements. The purpose of this guidance document is to provide general requirements, requirements on methods and acceptance criteria on risk-informed evaluation of TS changes based on PSA. The purpose is not to provide a single solution. As part of the review of the TS conditions this guidance specify requirements on: - Quality verification of the PSA model; - Verification that the PSA model is sufficiently robust with regard to SSCs for which requirements both are and are not defined by the TS; - Verification that the SSCs, for which TS demands are to be evaluated, are modelled in a sufficient manner; - Methods for performing the evaluation; - Which evaluation criteria that shall be used (and how that is verified to be correct); - Acceptance criteria: This guidance also briefly discusses the documentation of the analysis of the TS changes. This guidance

  20. Guidance to Risk-Informed Evaluation of Technical Specifications using PSA

    Energy Technology Data Exchange (ETDEWEB)

    Baeckstroem, Ola; Haeggstroem, Anna (Scandpower AB, Stockholm (Sweden)); Maennistoe, Ilkka (VTT, Helsingfors (Finland))

    2010-04-15

    This report presents guidance for evaluation of Technical Specification conditions with PSA. It covers quality in PSA, how to verify that the PSA model is sufficiently robust and sufficiently complete and general requirements on methods. Acceptance criteria for evaluation of changes in the TS conditions are presented. As the probabilistic safety assessment (PSA) has developed over the years, it has demonstrated to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. and in that way making the PSAs as well as the decision tools better. This also means that it will be possible to take credit for safety system overcapacity as well as inherent safety features and strength of non-safety classed systems. However, PSA is only one of the tools that shall be used in an evaluation process of TS changes (strengthening/relaxation). PSA is an excellent tool to be used to verify the importance, and thereby possibly relaxation, of TS requirements. But, since PSA is only one tool in the evaluation, it is not sufficient in itself for defining which equipment that shall or shall not have TS requirements. The purpose of this guidance document is to provide general requirements, requirements on methods and acceptance criteria on risk-informed evaluation of TS changes based on PSA. The purpose is not to provide a single solution. As part of the review of the TS conditions this guidance specify requirements on: - Quality verification of the PSA model; - Verification that the PSA model is sufficiently robust with regard to SSCs for which requirements both are and are not defined by the TS; - Verification that the SSCs, for which TS demands are to be evaluated, are modelled in a sufficient manner; - Methods for performing the evaluation; - Which evaluation criteria that shall be used (and how that is verified to be correct); - Acceptance criteria: This guidance also briefly discusses the documentation of the analysis of the TS changes. This guidance

  1. Risk assessment analysis of the future technical unit dedicated to the evaluation and treatment of motor disabilities.

    Science.gov (United States)

    Grelier, S; Thetio, M; Quentin, V; Achache, V; Sanchez, N; Leroux, V; Durand, E; Pequignot, R

    2011-03-01

    The National Hospital of Saint Maurice (HNSM) for Physical Medicine and Rehabilitation aims at strengthening its position as a pivot rehabilitation and physical therapy center. The opening in 2011 of a new unit for the evaluation and treatment of motor disabilities meets this objective. This project includes several parts: clinical, financial, architectural, organizational, applied clinical research as well as dealing with medical equipments and information system. This study focuses on the risk assessment of this future technical unit. This study was conducted by a group of professionals working for the hospital. It started with the design of a functional model to better comprehend the system to be analyzed. Risk assessment consists in confronting this functional model to a list of dangers in order to determine the vulnerable areas of the system. Then the team designed some scenarios to identify the causes, securities barriers and consequences in order to rank the risks. The analysis targeted various dangers, e.g. political, strategic, financial, economical, marketing, clinical and operational. The team identified more than 70 risky scenarios. For 75% of them the criticality level was deemed initially tolerable and under control or unacceptable. The implementation of an action plan for reducing the level of risks before opening this technical unit brought the system down to an acceptable level at 66%. A year prior to opening this technical unit for the evaluation and treatment of motor disabilities, conducting this preliminary risk assessment, with its exhaustive and rigorous methodology, enabled the concerned professionals to work together around an action plan for reducing the risks. 2011 Elsevier Masson SAS. All rights reserved.

  2. An Assessment of Technical and Production Risks of Candidate Low-Cost Attitude/Heading Reference Systems(AHRS)

    Science.gov (United States)

    Yuchnovicz, Daniel; Burgess, Malcolm; Hammers, William

    1999-01-01

    This report provides an assessment of technical and production risks of candidate low-cost attitude/heading reference systems (AHRS) for use in the Advanced General Aviation Transport Experiments (AGATE) airplanes. A low-cost AHRS is a key component of modem "glass cockpit" flight displays for General Aviation (GA) aircraft. The technical capabilities of several candidate low-cost AHRS were examined and described along with the technical issues involved with using all solid-state components for attitude measurement. An economic model was developed which describes the expected profit, rate of return, and volume requirements for the manufacture of low-cost AHRS for GA aircraft in the 2000 to 2020 time frame. The model is the result of interviews with GA airframe manufacturers, avionics manufacturers and historical analysis of avionics of similar complexity. The model shows that a manufacturer will break even after three years of AHRS production, realizing an 18 percent rate of return (23 percent profit) on an investment of $3.5M over the 20 year period. A start-up production estimate showed costs of $6-12M for a new company to build and certify an AHRS from scratch, considered to be a high-risk proposition, versus $0.25-0.75M for an experienced avionics manufacturer to manufacture a design under license, a low-risk proposition.

  3. Integrating technical analysis and public values in risk-based decision making

    International Nuclear Information System (INIS)

    Bohnenblust, Hans; Slovic, Paul

    1998-01-01

    Simple technical analysis cannot capture the complex scope of preferences or values of society and individuals. However, decision making needs to be sustained by formal analysis. The paper describes a policy framework which incorporates both technical analysis and aspects of public values. The framework can be used as a decision supporting tool and helps decision makers to make more informed and more transparent decisions about safety issues

  4. Risk communication: Translating technically complex information to facilitate informed decision-making

    International Nuclear Information System (INIS)

    Sprecher, W.M.; Turner, E.

    1991-01-01

    Based on a review of risk communication and related literature, including policy material, this paper describes the newly revamped risk management program of the DOE's Office of Civilian Radioactive Waste Management (OCRWM), and some of the risk-related issues being confronted as the high-level waste management program moves forward. It also describes preliminary activities underway in which the OCRWM is developing strategies for risk communication. The authors offer a definition of risk management as comprised by the components of risk assessment and risk communication. The paper explores the discrepant views that experts and nonexperts have with respect to what constitutes a valid risk assessment model. By illustrating differences in the assessment of risk by experts and lay people, the paper demonstrates how these differences can create challenges in communicating risk and making decisions about risk. Finally, the paper discusses ways in which risk communication could be enhance, and elaborates on the OCRWM's commitment to improve its overall risk management efforts

  5. Risk-based configuration control: Application of PRA in improving technical specifications and operational safety

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.

    1991-01-01

    The objective of risk-based configuration control is to detect and control plant configurations form a risk perspective. The configurations of particular interest involve components which are down during power operation. Controlling plant configurations from a risk-perspective can provide more direct risk control and also more operational flexibility by allowing looser control in areas unimportant to risk

  6. Final Technical Progress Report Long term risk from actinides in the environment: Modes of mobility; FINAL

    International Nuclear Information System (INIS)

    Thomas B. Kirchner

    2002-01-01

    The key source of uncertainty in assessing actinide mobility is the relative importance of transport by: (1) wind erosion, (2) water erosion, and (3) vertical migration. Each of these three processes depends on several environmental factors and they compete with one another. A scientific assessment of the long-term risks associated with actinides in surface soils depends on better quantifying each of these three modes of mobility. The objective from our EMSP study was to quantify the mobility of soil actinides by wind erosion, water erosion, and vertical migration at three semiarid sites where actinide mobility is a key technical, social and legal issue. This EMSP project was the first to evaluate all three factors at a site. The approach has been to investigate both short- and long-term issues based on field and lab studies and model comparisons. Our results demonstrate the importance of incorporating threshold responses into a modeling framework that accounts for environmental factors and natural disturbances that trigger large changes in actinide mobility. The study measured erosional losses of sediment and fallout cesium (an actinide analogue) from field plots located near WIPP in 1998. The results highlight the large effect of burning as a disturbance on contaminant transport and mobility via runoff and erosion. The results show that runoff, erosion, and actinide transport are (1) strongly site specific-differences in radionuclide transport between WIPP and Rocky Flats differed by a factor of twelve because of soil and vegetation differences, and (2) are strongly impacted by disturbances such as fire, which can increase runoff, erosion, and actinide transport by more than an order of magnitude. In addition, a laboratory experiment using soil columns was conducted to investigate the vertical transport of contaminants in sandy soils. Nine columns of soil collected from the vicinity of the WIPP site were prepared. The column consisted of a piece of PVC pipe 20 cm

  7. Final Technical Progress Report Long term risk from actinides in the environment: Modes of mobility

    International Nuclear Information System (INIS)

    Kirchner, Thomas B.

    2002-01-01

    The key source of uncertainty in assessing actinide mobility is the relative importance of transport by: (1) wind erosion, (2) water erosion, and (3) vertical migration. Each of these three processes depends on several environmental factors and they compete with one another. A scientific assessment of the long-term risks associated with actinides in surface soils depends on better quantifying each of these three modes of mobility. The objective from our EMSP study was to quantify the mobility of soil actinides by wind erosion, water erosion, and vertical migration at three semiarid sites where actinide mobility is a key technical, social and legal issue. This EMSP project was the first to evaluate all three factors at a site. The approach has been to investigate both short- and long-term issues based on field and lab studies and model comparisons. Our results demonstrate the importance of incorporating threshold responses into a modeling framework that accounts for environmental factors and natural disturbances that trigger large changes in actinide mobility. The study measured erosional losses of sediment and fallout cesium (an actinide analogue) from field plots located near WIPP in 1998. The results highlight the large effect of burning as a disturbance on contaminant transport and mobility via runoff and erosion. The results show that runoff, erosion, and actinide transport are (1) strongly site specific-differences in radionuclide transport between WIPP and Rocky Flats differed by a factor of twelve because of soil and vegetation differences, and (2) are strongly impacted by disturbances such as fire, which can increase runoff, erosion, and actinide transport by more than an order of magnitude. In addition, a laboratory experiment using soil columns was conducted to investigate the vertical transport of contaminants in sandy soils. Nine columns of soil collected from the vicinity of the WIPP site were prepared. The column consisted of a piece of PVC pipe 20 cm

  8. Final Technical Progress Report Long term risk from actinides in the environment: Modes of mobility

    Energy Technology Data Exchange (ETDEWEB)

    Thomas B. Kirchner

    2002-03-22

    The key source of uncertainty in assessing actinide mobility is the relative importance of transport by: (1) wind erosion, (2) water erosion, and (3) vertical migration. Each of these three processes depends on several environmental factors and they compete with one another. A scientific assessment of the long-term risks associated with actinides in surface soils depends on better quantifying each of these three modes of mobility. The objective from our EMSP study was to quantify the mobility of soil actinides by wind erosion, water erosion, and vertical migration at three semiarid sites where actinide mobility is a key technical, social and legal issue. This EMSP project was the first to evaluate all three factors at a site. The approach has been to investigate both short- and long-term issues based on field and lab studies and model comparisons. Our results demonstrate the importance of incorporating threshold responses into a modeling framework that accounts for environmental factors and natural disturbances that trigger large changes in actinide mobility. The study measured erosional losses of sediment and fallout cesium (an actinide analogue) from field plots located near WIPP in 1998. The results highlight the large effect of burning as a disturbance on contaminant transport and mobility via runoff and erosion. The results show that runoff, erosion, and actinide transport are (1) strongly site specific-differences in radionuclide transport between WIPP and Rocky Flats differed by a factor of twelve because of soil and vegetation differences, and (2) are strongly impacted by disturbances such as fire, which can increase runoff, erosion, and actinide transport by more than an order of magnitude. In addition, a laboratory experiment using soil columns was conducted to investigate the vertical transport of contaminants in sandy soils. Nine columns of soil collected from the vicinity of the WIPP site were prepared. The column consisted of a piece of PVC pipe 20 cm

  9. Hybrid causal methodology and software platform for probabilistic risk assessment and safety monitoring of socio-technical systems

    International Nuclear Information System (INIS)

    Groth, Katrina; Wang Chengdong; Mosleh, Ali

    2010-01-01

    This paper introduces an integrated framework and software platform for probabilistic risk assessment (PRA) and safety monitoring of complex socio-technical systems. An overview of the three-layer hybrid causal logic (HCL) modeling approach and corresponding algorithms, implemented in the Trilith software platform, are provided. The HCL approach enhances typical PRA methods by quantitatively including the influence of soft causal factors introduced by human and organizational aspects of a system. The framework allows different modeling techniques to be used for different aspects of the socio-technical system. The HCL approach combines the power of traditional event sequence diagram (ESD)event tree (ET) and fault tree (FT) techniques for modeling deterministic causal paths, with the flexibility of Bayesian belief networks for modeling non-deterministic cause-effect relationships among system elements (suitable for modeling human and organizational influences). Trilith enables analysts to construct HCL models and perform quantitative risk assessment and management of complex systems. The risk management capabilities included are HCL-based risk importance measures, hazard identification and ranking, precursor analysis, safety indicator monitoring, and root cause analysis. This paper describes the capabilities of the Trilith platform and power of the HCL algorithm by use of example risk models for a type of aviation accident (aircraft taking off from the wrong runway).

  10. Hybrid causal methodology and software platform for probabilistic risk assessment and safety monitoring of socio-technical systems

    Energy Technology Data Exchange (ETDEWEB)

    Groth, Katrina, E-mail: kgroth@umd.ed [Center for Risk and Reliability, 0151 Glenn L. Martin Hall, University of Maryland, College Park, MD 20742 (United States); Wang Chengdong; Mosleh, Ali [Center for Risk and Reliability, 0151 Glenn L. Martin Hall, University of Maryland, College Park, MD 20742 (United States)

    2010-12-15

    This paper introduces an integrated framework and software platform for probabilistic risk assessment (PRA) and safety monitoring of complex socio-technical systems. An overview of the three-layer hybrid causal logic (HCL) modeling approach and corresponding algorithms, implemented in the Trilith software platform, are provided. The HCL approach enhances typical PRA methods by quantitatively including the influence of soft causal factors introduced by human and organizational aspects of a system. The framework allows different modeling techniques to be used for different aspects of the socio-technical system. The HCL approach combines the power of traditional event sequence diagram (ESD)event tree (ET) and fault tree (FT) techniques for modeling deterministic causal paths, with the flexibility of Bayesian belief networks for modeling non-deterministic cause-effect relationships among system elements (suitable for modeling human and organizational influences). Trilith enables analysts to construct HCL models and perform quantitative risk assessment and management of complex systems. The risk management capabilities included are HCL-based risk importance measures, hazard identification and ranking, precursor analysis, safety indicator monitoring, and root cause analysis. This paper describes the capabilities of the Trilith platform and power of the HCL algorithm by use of example risk models for a type of aviation accident (aircraft taking off from the wrong runway).

  11. Technical Specification action statements requiring shutdown. A risk perspective with application to the RHR/SSW systems of a BWR

    Energy Technology Data Exchange (ETDEWEB)

    Mankamo, T. [Avaplan Oy, Espoo (Finland); Kim, I.S.; Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States)

    1993-11-01

    When safety systems fail during power operation, the limiting conditions for operation (LCOs) and associated action statements of technical specifications typically require that the plant be shut down within the limits of allowed outage time (AOT). However, when a system needed to remove decay heat, such as the residual heat removal (RHR) system, is inoperable or degraded, shutting down the plant may not necessarily be preferable, from a risk perspective, to continuing power operation over a usual repair time, giving priority to the repairs. The risk impact of the basic operational alternatives, i.e., continued operation or shutdown, was evaluated for failures in the RHR and standby service water (SSW) systems of a boiling-water reactor (BWR) nuclear power plant. A complete or partial failure of the SSW system fails or degrades not only the RHR system but other front-line safety systems supported by the SSW system. This report presents the methodology to evaluate the risk impact of LCOs and associated AOT; the results of risk evaluation from its application to the RHR and SSW systems of a BWR; the findings from the risk-sensitivity analyses to identify alternative operational policies; and the major insights and recommendations to improve the technical specifications action statements.

  12. Probabilistic risk assessment for the Sandia National Laboratories Technical Area V Liquid Waste Disposal System surface impoundments

    International Nuclear Information System (INIS)

    Dawson, L.A.; Eidson, A.F.

    1996-01-01

    A probabilistic risk assessment was completed for a former radioactive waste disposal site. The site, two unlined surface impoundment, was designed as part of the Liquid Waste Disposal System (LWDS) to receive radioactive effluent from nuclear reactors in Technical Area-V (TA-V) at Sandia National Laboratories/New Mexico (SNL/NM). First, a statistical comparison of site sampling results to natural background, using EPA methods, and a spatial distribution analysis were performed. Risk assessment was conducted with SNL/NM's Probabilistic Risk Evaluation and Characterization Investigation System model. The risk assessment indicated that contamination from several constituents might have been high enough to require remediation. However, further analysis based on expected site closure activities and recent EPA guidance indicated that No Further Action was acceptable

  13. The influence of outrage and technical detail on the perception of environmental health risks

    NARCIS (Netherlands)

    Jochems D; Bruggen M van; IMD; GGD Rotterdam

    2004-01-01

    Differences in risk perception between a professional assessing a risk and a concerned community affected by this risk have been shown to be important obstacles in the communication of environmental health risks. The study reported here aimed at gaining insight into factors that influence people's

  14. Model-Driven Information Security Risk Assessment of Socio-Technical Systems

    NARCIS (Netherlands)

    Ionita, Dan

    2018-01-01

    As more aspects of life transition to the digital domain, computer systems become increasingly complex but also more social. But assessing a socio-technical system is no trivial task: it often requires intimate knowledge of the system, awareness of the social dynamics and trust relationships of its

  15. A socio-technical system framework for risk-informed performance-based building regulation

    NARCIS (Netherlands)

    Meacham, B.J.; Straalen, IJ.J. van

    2017-01-01

    Building regulatory systems have been evolving in recent decades, first with a transition to a functional or performance basis, and more recently with the introduction of new societal objectives, including those related to sustainability and climate change resiliency. Various policy and technical

  16. Modelling risk in high hazard operations : Integrating technical, organisational and cultural factors

    NARCIS (Netherlands)

    Ale, B.J.M.; Hanea, D.M.; Sillem, S.; Lin, P.H.; Van Gulijk, C.; Hudson, P.T.W.

    2012-01-01

    Recent disasters in high hazard industries such as Oil and Gas Exploration (The Deepwater Horizon) and Petrochemical production (Texas City) have been found to have causes that range from direct technical failures through organizational shortcomings right up to weak regulation and inappropriate

  17. A Friend in Your Neighborhood: Local Risk Communication in a Technical Writing Classroom

    Science.gov (United States)

    Rhodes, Lynne

    2009-01-01

    When examined rhetorically, Savannah River Site Community Preparedness Information calendars from 1994, 2004, and 2008 represent living rhetorical practices aimed at changing the public mind. My technical communication classroom at USC Aiken is uniquely situated for us to examine documents constantly generated by the site's Public Affairs…

  18. Technical Performance Measurement, Earned Value, and Risk Management: An Integrated Diagnostic Tool for Program Management

    National Research Council Canada - National Science Library

    Pisano, N

    2002-01-01

    ...(A)), is known as the Navy PEO(A) Technical Performance Measurement (TPM) System. A retrospective analysis was conducted on the T45TS Cockpit-21 program and real-time test implementations are being conducted on the Federal Aviation Administration's (FAA...

  19. Improving the action requirements of technical specifications: A risk-comparison of continued operation and plant shutdown

    Energy Technology Data Exchange (ETDEWEB)

    Kim, I.S.; Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States); Mankamo, T.

    1995-04-01

    When the systems needed to remove decay heat are inoperable or degraded, the risk of shutting down the plant may be comparable to, or even higher than, that of continuing power operation with the equipment inoperable while giving priority to repairs. This concern arises because the plant may not have sufficient capability for removing decay heat during the shutdown. However, Technical Specifications (TSs) often require {open_quotes}immediate{close_quotes} shutdown of the plant. In this paper, we present risk-based analyses of the various operational policy alternatives available in such situations, with an example application to the standby service water (SSW) system of a BWR. These analyses can be used to define risk-effective requirements for those standby safety systems under discussion.

  20. Improving the action requirements of technical specifications: A risk-comparison of continued operation and plant shutdown

    International Nuclear Information System (INIS)

    Kim, I.S.; Samanta, P.K.

    1994-01-01

    When the systems needed to remove decay heat are inoperable or degraded, the risk of shutting down the plant may be comparable to, or even higher than, that of continuing power operation with the equipment inoperable while giving priority to repairs. This concern arises because the plant may not have sufficient capability for removing decay heat during the shutdown. However, Technical Specifications (TSs) often require ''immediate'' shutdown of the plant. In this paper, the authors present risk-based analyses of the various operational policy alternatives available in such situations, with an example application to the standby service water (SSW) system of a BWR. These analyses can be used to define risk-effective requirements for those standby safety systems under discussion

  1. Preoperative short hookwire placement for small pulmonary lesions: evaluation of technical success and risk factors for initial placement failure.

    Science.gov (United States)

    Iguchi, Toshihiro; Hiraki, Takao; Matsui, Yusuke; Fujiwara, Hiroyasu; Masaoka, Yoshihisa; Tanaka, Takashi; Sato, Takuya; Gobara, Hideo; Toyooka, Shinichi; Kanazawa, Susumu

    2018-05-01

    To retrospectively evaluate the technical success of computed tomography fluoroscopy-guided short hookwire placement before video-assisted thoracoscopic surgery and to identify the risk factors for initial placement failure. In total, 401 short hookwire placements for 401 lesions (mean diameter 9.3 mm) were reviewed. Technical success was defined as correct positioning of the hookwire. Possible risk factors for initial placement failure (i.e., requirement for placement of an additional hookwire or to abort the attempt) were evaluated using logistic regression analysis for all procedures, and for procedures performed via the conventional route separately. Of the 401 initial placements, 383 were successful and 18 failed. Short hookwires were finally placed for 399 of 401 lesions (99.5%). Univariate logistic regression analyses revealed that in all 401 procedures only the transfissural approach was a significant independent predictor of initial placement failure (odds ratio, OR, 15.326; 95% confidence interval, CI, 5.429-43.267; p < 0.001) and for the 374 procedures performed via the conventional route only lesion size was a significant independent predictor of failure (OR 0.793, 95% CI 0.631-0.996; p = 0.046). The technical success of preoperative short hookwire placement was extremely high. The transfissural approach was a predictor initial placement failure for all procedures and small lesion size was a predictor of initial placement failure for procedures performed via the conventional route. • Technical success of preoperative short hookwire placement was extremely high. • The transfissural approach was a significant independent predictor of initial placement failure for all procedures. • Small lesion size was a significant independent predictor of initial placement failure for procedures performed via the conventional route.

  2. Improving SPAWAR PEO C4I Organizational Alignment to Better Enable Enterprise Technical Risk Management

    Science.gov (United States)

    2017-03-01

    dependency requires cross-system risk management . To this end, DOD, as well as businesses in many other industries, are turning toward enterprise...It does not address enterprise risk management . Enterprise risk management is not a new concept, originating in the mid-1990s in private industry...respective university’s business school, the concept of managing risk at an enterprise, or system-of-systems level is also taking hold in the DOD. To

  3. Incorporating organizational factors into Probabilistic Risk Assessment (PRA) of complex socio-technical systems: A hybrid technique formalization

    International Nuclear Information System (INIS)

    Mohaghegh, Zahra; Kazemi, Reza; Mosleh, Ali

    2009-01-01

    This paper is a result of a research with the primary purpose of extending Probabilistic Risk Assessment (PRA) modeling frameworks to include the effects of organizational factors as the deeper, more fundamental causes of accidents and incidents. There have been significant improvements in the sophistication of quantitative methods of safety and risk assessment, but the progress on techniques most suitable for organizational safety risk frameworks has been limited. The focus of this paper is on the choice of 'representational schemes' and 'techniques.' A methodology for selecting appropriate candidate techniques and their integration in the form of a 'hybrid' approach is proposed. Then an example is given through an integration of System Dynamics (SD), Bayesian Belief Network (BBN), Event Sequence Diagram (ESD), and Fault Tree (FT) in order to demonstrate the feasibility and value of hybrid techniques. The proposed hybrid approach integrates deterministic and probabilistic modeling perspectives, and provides a flexible risk management tool for complex socio-technical systems. An application of the hybrid technique is provided in the aviation safety domain, focusing on airline maintenance systems. The example demonstrates how the hybrid method can be used to analyze the dynamic effects of organizational factors on system risk

  4. Incorporating organizational factors into Probabilistic Risk Assessment (PRA) of complex socio-technical systems: A hybrid technique formalization

    Energy Technology Data Exchange (ETDEWEB)

    Mohaghegh, Zahra [Center for Risk and Reliability, University of Maryland, College Park, MD 20742 (United States)], E-mail: mohagheg@umd.edu; Kazemi, Reza; Mosleh, Ali [Center for Risk and Reliability, University of Maryland, College Park, MD 20742 (United States)

    2009-05-15

    This paper is a result of a research with the primary purpose of extending Probabilistic Risk Assessment (PRA) modeling frameworks to include the effects of organizational factors as the deeper, more fundamental causes of accidents and incidents. There have been significant improvements in the sophistication of quantitative methods of safety and risk assessment, but the progress on techniques most suitable for organizational safety risk frameworks has been limited. The focus of this paper is on the choice of 'representational schemes' and 'techniques.' A methodology for selecting appropriate candidate techniques and their integration in the form of a 'hybrid' approach is proposed. Then an example is given through an integration of System Dynamics (SD), Bayesian Belief Network (BBN), Event Sequence Diagram (ESD), and Fault Tree (FT) in order to demonstrate the feasibility and value of hybrid techniques. The proposed hybrid approach integrates deterministic and probabilistic modeling perspectives, and provides a flexible risk management tool for complex socio-technical systems. An application of the hybrid technique is provided in the aviation safety domain, focusing on airline maintenance systems. The example demonstrates how the hybrid method can be used to analyze the dynamic effects of organizational factors on system risk.

  5. Risk-based evaluation of technical specification problems at the La Salle County Nuclear Station: Final report

    International Nuclear Information System (INIS)

    Bizzak, D.J.; Trainer, J.E.; McClymont, A.S.

    1987-06-01

    Probabilistic risk assessment (PRA) methods are used to evaluate alternatives to existing requirements for three operationally burdensome technical specifications at La Salle Nuclear Station. The study employs a decision logic to minimize the detailed analysis necessary to show compliance with given acceptance criteria; in this case, no risk increase resulting from a proposed change. The analyses provide insights to choose from among alternative options. The SOCRATES computer code was used for the probabilistic analysis. Results support a change to less frequent diesel generator testing, eliminations of one reactor scram setpoint, and establishing an allowed out-of-service time for valves in a reactor scram system. In each case, the change would result in a safety improvement

  6. A computer code for Cohort Analysis of Increased Risks of Death (CAIRD). Technical report

    International Nuclear Information System (INIS)

    Cook, J.R.; Bunger, B.M.; Barrick, M.K.

    1978-06-01

    The most serious health risk confronting individuals exposed to radiation is death from an induced cancer. Since cancers usually do no develop until many years after exposure, other causes of death may intervene and take the lives of those destined to die from cancer. This computer code has been developed to aid risk analysis by calculating the number of premature deaths and loss of years of life produced by a hypothetical population after exposure to a given risk situation. The code generates modified life tables and estimates the impact of increased risk through several numerical comparisons with the appropriate reference life tables. One of the code's frequent applications is in estimating the number of radiation induced deaths that would result from exposing an initial population of 100,000 individuals to an annual radiation dose. For each risk situation analyzed, the computer code generates a summary table which documents the input, data and contains the results of the comparisons with reference life tables

  7. Patient Transfers and Risk of Back Injury: Protocol for a Prospective Cohort Study With Technical Measurements of Exposure.

    Science.gov (United States)

    Vinstrup, Jonas; Madeleine, Pascal; Jakobsen, Markus Due; Jay, Kenneth; Andersen, Lars Louis

    2017-11-08

    More than one third of nurses experience musculoskeletal pain several times during a normal work week. Consistent use of assistive devices during patient transfers is associated with a lower risk of occupational back injuries and low back pain (LBP). While uncertainties exist regarding which type of assistive devices most efficiently prevent LBP, exposure assessments using technological advancements allow for quantification of muscle load and body positions during common work tasks. The main objectives of this study are (1) to quantify low back and neck/shoulder muscle load in Danish nurses during patient transfers performed with different types of assistive devices, and (2) to combine the exposure profile for each type of assistive device with fortnightly questionnaires to identify the importance of muscle load (intensity and frequency of transfers) and body position (degree of back inclination and frequency) on LBP intensity and risk of back injury during a patient transfer. A combination of technical measurements (n=50) and a prospective study design (n=2000) will be applied on a cohort of female nurses in Danish hospitals. The technical measurements will be comprised of surface electromyography and accelerometers, with the aim of quantifying muscle load and body positions during various patient transfers, including different types of assistive devices throughout a workday. The study will thereby gather measurements during real-life working conditions. The prospective cohort study will consist of questionnaires at baseline and 1-year follow-up, as well as follow-up via email every other week for one year on questions regarding the frequency of patient transfers, use of assistive devices, intensity of LBP, and back injuries related to patient transfers. The objective measurements on muscle load and body positions during patient handlings will be applied to the fortnightly replies regarding frequency of patient transfer and use of different assistive devices, in

  8. Integral risk assessment. Technical, ethical and social aspects. Ganzheitliche Risikobetrachtungen. Technische, ethische und soziale Aspekte

    Energy Technology Data Exchange (ETDEWEB)

    Chakraborty, S; Yadigaroglu, G [eds.

    1991-01-01

    The series of lectures which forms the basis of this book and took place in the winter of 1989/90 at the ETH in Zuerich were held for the purpose of discussing the stage of development of our system of ethics in view of the extremely fast pace of technological progress and the risks which accompany it. Legal, psychological and political aspects of the problem were examined, but the emphasis was placed on ethical aspects. The effects which are examined in conventional risk analyses can be considered as a part of the ethical and social aspects involved, and in turn, the consideration of ethical and social aspects can be viewed as an extension of the conventional form of risk analysis. In any case, among risk experts, the significance of ethical and social factors is uncontested, especially as regards activities which can have far-reaching repurcussions. Some objective difficulties interfere with this goal, however: - No generally acknowledged set of ethical values exists. - Cultural influences and personal motives can interfere. - Normally a risk assessment is carried out in reference to individual facilities and within a small, clearly defined framework. Under certain circumstances, generalizations which are made for complete technological systems can lead to completely different conclusions. One contribution deals with integral views of the risks of atomic energy from an ethical and social perspective. (orig.).

  9. Technical Report on Preliminary Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Ramuhalli, Pradeep; Coles, Garill A.; Coble, Jamie B.; Hirt, Evelyn H.

    2013-09-17

    Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. AdvSMRs may provide a longer-term alternative to traditional light-water reactors (LWRs) and SMRs based on integral pressurized water reactor concepts currently being considered. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment. AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors. Some of this loss can be recovered through reduced capital costs through smaller size, fewer components, modular fabrication processes, and the opportunity for modular construction. However, the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments that are a step towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results from an initial methodology for enhanced risk monitors by integrating real-time information about equipment condition and POF into risk monitors.

  10. Technical note: Risk detection in light steel frame buildings in design, construction and implementation phases

    Directory of Open Access Journals (Sweden)

    Ali Yeganeh

    2017-12-01

    Full Text Available Light Steel Frame System that is briefly called "LSF" is a building system which is used for implying of short-rise and mid-rise buildings (up to five floors. It is a desirable building system for civil engineers (in terms of gravity and lateral load in developing countries. This system gets significant benefits, although in Iran it is not much used due to the reasons such as: opposite with people’s culture, higher price in, lack of specialists, executive problems and etc. So in this article, we are tried to study LSF structures from the design and implementation stage to the operation and identify its risks exactly and finally offer a solution for each risk. Risk detections process is executed with interview technique in the Mashhad city and countryside. Totally, 56 projects are examined in this research. The study projects have been classified here. This classification includes residential buildings, villas, added-storey, schools, administrative, commercial, fastfood, industrial structures and LSF non-load-bearing walls. All the mentioned projects have been implemented in holy city of Mashhad or will be implemented in the future. Designers, administrators and employers are interviewed in person in all the above projects. Because of novelty of this system and its unknown risks, this research can be useful for managers decision making and for executing engineers in the field of choosing the best system for project and adoption of appropriate method for preventing these risks.

  11. Risk factors for technical failure of endoscopic double self-expandable metallic stent placement by partial stent-in-stent method.

    Science.gov (United States)

    Kawakubo, Kazumichi; Kawakami, Hiroshi; Toyokawa, Yoshihide; Otani, Koichi; Kuwatani, Masaki; Abe, Yoko; Kawahata, Shuhei; Kubo, Kimitoshi; Kubota, Yoshimasa; Sakamoto, Naoya

    2015-01-01

    Endoscopic double self-expandable metallic stent (SEMS) placement by the partial stent-in-stent (PSIS) method has been reported to be useful for the management of unresectable hilar malignant biliary obstruction. However, it is technically challenging, and the optimal SEMS for the procedure remains unknown. The aim of this study was to identify the risk factors for technical failure of endoscopic double SEMS placement for unresectable malignant hilar biliary obstruction (MHBO). Between December 2009 and May 2013, 50 consecutive patients with MHBO underwent endoscopic double SEMS placement by the PSIS method. We retrospectively evaluated the rate of successful double SEMS placement and identified the risk factors for technical failure. The technical success rate for double SEMS placement was 82.0% (95% confidence interval [CI]: 69.2-90.2). On univariate analysis, the rate of technical failure was high in patients with metastatic disease and unilateral placement. Multivariate analysis revealed that metastatic disease was a significant risk factor for technical failure (odds ratio: 9.63, 95% CI: 1.11-105.5). The subgroup analysis after double guidewire insertion showed that the rate of technical success was higher in the laser-cut type SEMS with a large mesh and thick delivery system than in the braided type SEMS with a small mesh and thick delivery system. Metastatic disease was a significant risk factor for technical failure of double SEMS placement for unresectable MHBO. The laser-cut type SEMS with a large mesh and thin delivery system might be preferable for the PSIS procedure. © 2014 Japanese Society of Hepato-Biliary-Pancreatic Surgery.

  12. Literacy Profiles of At-Risk Young Adults Enrolled in Career and Technical Education

    Science.gov (United States)

    Mellard, Daryl F.; Woods, Kari L.; Lee, Jae Hoon

    2016-01-01

    A latent profile analysis of 323 economically and academically at-risk adolescent and young adult learners yielded two classes: an average literacy class (92%) and a low literacy class (8%). The class profiles significantly differed in their word reading and math skills, and in their processing speeds and self-reported learning disabilities. The…

  13. Adolescent Substance Abuse: Risk Factors and Prevention Strategies. Maternal & Child Health Technical Information Bulletin.

    Science.gov (United States)

    Werner, Mark J.

    The high prevalence of alcohol and substance abuse by adolescents poses a significant threat to the wellness of youth. Adolescents appear to use drugs for a variety of reasons. In addition to the multiple etiologic and risk factors present for substance abuse, there are many pathways teenagers may follow on their way to substance abuse. The…

  14. Risk assessment and modeling of technical solutions for filtrations earth dams

    Directory of Open Access Journals (Sweden)

    Michael Álvarez González

    2017-12-01

    Full Text Available The paper presents the evaluation and the analysis of three types of filter geometry to evaluate the filtration risk in Zaza Reservoir, taking as starting point the historic characteristics of the fluctuation of water levels inside the earth dam. The work is based on the experience of a multidisciplinary team and previous research with bi-dimensional models, using the Finite Elements Method for the solution of basic engineering problems. Also, the results of the installation of a new filter system with a geospatial index are evaluated (under criteria of threats, vulnerability, and risk with spatial visualization data in a Geographical Information System for thematic maps generation, that represent how much the water level varies inside the dam according to the different filters evaluated.

  15. Mathematical models of cancer and their use in risk assessment. Technical report No. 27

    International Nuclear Information System (INIS)

    Whittemore, A.S.

    1979-08-01

    The sensitivity of risk predictions to certain assumptions in the underlying mathematical model is illustrated. To avoid the misleading and erroneous predictions that can result from the use of models incorporating assumptions whose validity is questionable, the following steps should be taken. First, state the assumptions used in a proposed model in terms that are clear to all who will use the model to assess risk. Second, assess the sensitivity of predictions to changes in model assumptions. Third, scrutinize pivotal assumptions in light of the best available human and animal data. Fourth, stress inconsistencies between model assumptions and experimental or epidemiological observations. The model fitting procedure will yield the most information when the data discriminates between theories because of their inconsistency with one or more assumptions. In this sense, mathematical theories are most successful when they fail. Finally, exclude value judgments from the quantitative procedures used to assess risk; instead include them explicitly in that part of the decision process concerned with cost-benefit analysis

  16. Low Dose Radiation Cancer Risks: Epidemiological and Toxicological Models. Final Technical Report

    International Nuclear Information System (INIS)

    Hoel, David G.

    2012-01-01

    The basic purpose of this one year research grant was to extend the two stage clonal expansion model (TSCE) of carcinogenesis to exposures other than the usual single acute exposure. The two-stage clonal expansion model of carcinogenesis incorporates the biological process of carcinogenesis, which involves two mutations and the clonal proliferation of the intermediate cells, in a stochastic, mathematical way. The current TSCE model serves a general purpose of acute exposure models but requires numerical computation of both the survival and hazard functions. The primary objective of this research project was to develop the analytical expressions for the survival function and the hazard function of the occurrence of the first cancer cell for acute, continuous and multiple exposure cases within the framework of the piece-wise constant parameter two-stage clonal expansion model of carcinogenesis. For acute exposure and multiple exposures of acute series, it is either only allowed to have the first mutation rate vary with the dose, or to have all the parameters be dose dependent; for multiple exposures of continuous exposures, all the parameters are allowed to vary with the dose. With these analytical functions, it becomes easy to evaluate the risks of cancer and allows one to deal with the various exposure patterns in cancer risk assessment. A second objective was to apply the TSCE model with varing continuous exposures from the cancer studies of inhaled plutonium in beagle dogs. Using step functions to estimate the retention functions of the pulmonary exposure of plutonium the multiple exposure versions of the TSCE model was to be used to estimate the beagle dog lung cancer risks. The mathematical equations of the multiple exposure versions of the TSCE model were developed. A draft manuscript which is attached provides the results of this mathematical work. The application work using the beagle dog data from plutonium exposure has not been completed due to the fact

  17. Demographic And Technical Risk Factors Of 30-Day Stroke, Myocardial Infarction, And/Or Death In Standard And High Risk Patients Who Underwent Carotid Angioplasty And Stenting

    Directory of Open Access Journals (Sweden)

    Samaneh Yousefi

    2017-02-01

    Full Text Available Background: Carotid angioplasty and stenting (CAS is an accepted treatment to prevent stroke in patients with carotid artery stenosis. The purpose of this study is to identify risk factors for major complications after carotid angioplasty and stenting. Methods and Material: This is a prospective study conducted at Shiraz University of Medical Sciences in southern Iran from March 2011 to June 2014. Consecutive patients undergoing carotid angioplasty and stenting were enrolled. Both standard risk and high risk patients for endarterectomy were enrolled. Demographic data, atherosclerotic risk factors, site of stenosis, degree of stenosis, and data regarding technical factors were recorded. 30-day stroke, myocardial infarction, and/or death were considered as the composite primary outcome of the study. Results:  two hundred and fifty one patients were recruited (mean age: 71.1+ 9.6 years, male: 65.3%.  One hundred and seventy eight (70.9% patients were symptomatic; 73 (29.1%, 129 (51.4%, 165 (65.7% and 62 (24.7% patients were diabetic, hyperlipidemic, hypertensive and smoker respectively. CAS performed for left ICA in 113 (45.4% patients. 14 (5.6% patients had Sequential bilateral stenting. Mean stenosis of operated ICA was 80.2 +13.8 %. Embolic protection device was used in 203 (96.2% patients. Predilation and post-dilation were performed in 39 (18.5% and 182 (86.3% patients respectively. Composite outcome was observed in 3.6% (3.2% stroke, 0% myocardial infarction and 1.2% death. Left sided lesions and presence of DM was significantly associated with poor short term outcome. (P value: 0.025 and 0.020, respectively Conclusion: There was a higher risk of short term major complications in diabetic patients and left carotid artery intervention.

  18. Political, social and technical risks in the last stages of disease eradication campaigns.

    Science.gov (United States)

    Whitty, Christopher J M

    2015-09-01

    Eradication of a disease is one of the greatest gifts any generation can give to subsequent ones, but most attempts have failed. The biggest challenges occur in the final stages of eradication and elimination campaigns. These include falling public support as a disease becomes less common; the emergence of groups who do not support eradication; spiralling costs; and the evolution of drug, vaccine or insecticide resistance. Mass campaigns become less effective as the disease fragments and modelling becomes less reliable. Optimism bias is the biggest risk to any eradication campaign and the long endgame must be planned for from the beginning. © The Author 2015. Published by Oxford University Press on behalf of Royal Society of Tropical Medicine and Hygiene. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  19. Technical-Induced Hemolysis in Patients with Respiratory Failure Supported with Veno-Venous ECMO - Prevalence and Risk Factors.

    Science.gov (United States)

    Lehle, Karla; Philipp, Alois; Zeman, Florian; Lunz, Dirk; Lubnow, Matthias; Wendel, Hans-Peter; Göbölös, Laszlo; Schmid, Christof; Müller, Thomas

    2015-01-01

    The aim of the study was to explore the prevalence and risk factors for technical-induced hemolysis in adults supported with veno-venous extracorporeal membrane oxygenation (vvECMO) and to analyze the effect of hemolytic episodes on outcome. This was a retrospective, single-center study that included 318 adult patients (Regensburg ECMO Registry, 2009-2014) with acute respiratory failure treated with different modern miniaturized ECMO systems. Free plasma hemoglobin (fHb) was used as indicator for hemolysis. Throughout a cumulative support duration of 4,142 days on ECMO only 1.7% of the fHb levels were above a critical value of 500 mg/l. A grave rise in fHb indicated pumphead thrombosis (n = 8), while acute oxygenator thrombosis (n = 15) did not affect fHb. Replacement of the pumphead normalized fHb within two days. Neither pump or cannula type nor duration on the first system was associated with hemolysis. Multiple trauma, need for kidney replacement therapy, increased daily red blood cell transfusion requirements, and high blood flow (3.0-4.5 L/min) through small-sized cannulas significantly resulted in augmented blood cell trauma. Survivors were characterized by lower peak levels of fHb [90 (60, 142) mg/l] in comparison to non-survivors [148 (91, 256) mg/l, p≤0.001]. In conclusion, marked hemolysis is not common in vvECMO with modern devices. Clinically obvious hemolysis often is caused by pumphead thrombosis. High flow velocity through small cannulas may also cause technical-induced hemolysis. In patients who developed lung failure due to trauma, fHb was elevated independantly of ECMO. In our cohort, the occurance of hemolysis was associated with increased mortality.

  20. Technical-Induced Hemolysis in Patients with Respiratory Failure Supported with Veno-Venous ECMO - Prevalence and Risk Factors.

    Directory of Open Access Journals (Sweden)

    Karla Lehle

    Full Text Available The aim of the study was to explore the prevalence and risk factors for technical-induced hemolysis in adults supported with veno-venous extracorporeal membrane oxygenation (vvECMO and to analyze the effect of hemolytic episodes on outcome. This was a retrospective, single-center study that included 318 adult patients (Regensburg ECMO Registry, 2009-2014 with acute respiratory failure treated with different modern miniaturized ECMO systems. Free plasma hemoglobin (fHb was used as indicator for hemolysis. Throughout a cumulative support duration of 4,142 days on ECMO only 1.7% of the fHb levels were above a critical value of 500 mg/l. A grave rise in fHb indicated pumphead thrombosis (n = 8, while acute oxygenator thrombosis (n = 15 did not affect fHb. Replacement of the pumphead normalized fHb within two days. Neither pump or cannula type nor duration on the first system was associated with hemolysis. Multiple trauma, need for kidney replacement therapy, increased daily red blood cell transfusion requirements, and high blood flow (3.0-4.5 L/min through small-sized cannulas significantly resulted in augmented blood cell trauma. Survivors were characterized by lower peak levels of fHb [90 (60, 142 mg/l] in comparison to non-survivors [148 (91, 256 mg/l, p≤0.001]. In conclusion, marked hemolysis is not common in vvECMO with modern devices. Clinically obvious hemolysis often is caused by pumphead thrombosis. High flow velocity through small cannulas may also cause technical-induced hemolysis. In patients who developed lung failure due to trauma, fHb was elevated independantly of ECMO. In our cohort, the occurance of hemolysis was associated with increased mortality.

  1. Estimation of the excess lifetime cancer risk from radon exposure in some buildings of Kufa Technical Institute, Iraq

    Directory of Open Access Journals (Sweden)

    Ali Abid Abojassim

    2017-12-01

    Full Text Available A number of international health organizations consider the exposure to residential radon as the second main cause of lung cancer after cigarette smoking. It was found that there is no database on radon concentrations for the Kufa Technical Institute buildings in the literature. This therefore triggers a special need for radon measurement in some Kufa Technical Institute buildings. This study aims to investigate the indoor radon levels inside the Kufa Technical Institute buildings for the first time using different radon measurement methods such as active (RAD-7 and passive (LR-115 Type II methods. Seventy eight of Solid-State Nuclear Track Detectors (SSNTDs LR-115 Type II were distributed at four buildings within the study area. The LR-115 Type II detectors were exposed in the study area for three months period. In parallel to the latter, seventy two active measurements were conducted using RAD-7 in the same buildings for correlation investigation purposes between the two kinds of measurements (i.e. passive and active.The results demonstrate that the radon concentrations were generally low, ranging from 38.4 to 77.2 Bq/m3, with a mean value of 50 Bq/m3. The mean of the equilibrium equivalent radon concentration and annual effective dose were assessed to be 19.9 Bq/m3 and 1.2 mS/y, respectively; the excess lifetime lung cancer risk was approximately 11.6 per million personal. A high correlation was found between the methods of measurements (i.e. LR-115 Type II and RAD-7, R2 = 0.99 which is significant at P < 0.001. The results of this work revealed that the Radon concentration was below the action level set by the United States Environmental Protection Agency of 148 Bq/m3. This therefore indicates that no radiological health hazard exists. However, the relatively high concentrations in some classrooms can be addressed by the natural ventilation or the classrooms being supplied with suction fans.

  2. A longitudinal study on risk factors for neck and shoulder pain among young adults in the transition from technical school to working life

    NARCIS (Netherlands)

    Hanvold, T.N.; Warsted, M.; Mengshoel, A.M.; Bjertness, E.; Twisk, J.W.R.; Veiersted, K.B.

    2014-01-01

    Objectives The study examined the course of neck and shoulder pain among a cohort of technical school students entering working life. We also aimed to identify work-related and individual risk factors for neck and shoulder pain during this transition period. Methods The study was designed as a

  3. Innovative approach using interprofessional simulation to educate surgical residents in technical and nontechnical skills in high-risk clinical scenarios.

    Science.gov (United States)

    Nicksa, Grace A; Anderson, Cristan; Fidler, Richard; Stewart, Lygia

    2015-03-01

    The Accreditation Council for Graduate Medical Education core competencies stress nontechnical skills that can be difficult to evaluate and teach to surgical residents. During emergencies, surgeons work in interprofessional teams and are required to perform certain procedures. To obtain proficiency in these skills, residents must be trained. To educate surgical residents in leadership, teamwork, effective communication, and infrequently performed emergency surgical procedures with the use of interprofessional simulations. SimMan 3GS was used to simulate high-risk clinical scenarios (15-20 minutes), followed by debriefings with real-time feedback (30 minutes). A modified Oxford Non-Technical Skills scale (score range, 1-4) was used to assess surgical resident performance during the first half of the academic year (July-December 2012) and the second half of the academic year (January-June 2013). Anonymous online surveys were used to solicit participant feedback. Simulations were conducted in the operating room, intensive care unit, emergency department, ward, and simulation center. A total of 43 surgical residents (postgraduate years [PGYs] 1 and 2) participated in interdisciplinary clinical scenarios, with other health care professionals (nursing, anesthesia, critical care, medicine, respiratory therapy, and pharmacy; mean number of nonsurgical participants/session: 4, range 0-9). Thirty seven surgical residents responded to the survey. Simulation of high-risk clinical scenarios: postoperative pulmonary embolus, pneumothorax, myocardial infarction, gastrointestinal bleeding, anaphylaxis with a difficult airway, and pulseless electrical activity arrest. Evaluation of resident skills: communication, leadership, teamwork, problem solving, situation awareness, and confidence in performing emergency procedures (eg, cricothyroidotomy). A total of 31 of 35 (89%) of the residents responding found the sessions useful. Additionally, 28 of 33 (85%) reported improved confidence

  4. PERSPECTIVE: Technical fixes and climate change: optimizing for risks and consequences

    Science.gov (United States)

    Rasch, Philip J.

    2010-09-01

    Scientists and society in general are becoming increasingly concerned about the risks of climate change from the emission of greenhouse gases (IPCC 2007). Yet emissions continue to increase (Raupach et al 2007), and achieving reductions soon enough to avoid large and undesirable impacts requires a near-revolutionary global transformation of energy and transportation systems (Hoffert et al 1998). The size of the transformation and lack of an effective societal response have motivated some to explore other quite controversial strategies to mitigate some of the planetary consequences of these emissions. These strategies have come to be known as geoengineering: 'the deliberate manipulation of the planetary environment to counteract anthropogenic climate change' (Keith 2000). Concern about society's inability to reduce emissions has driven a resurgence in interest in geoengineering, particularly following the call for more research in Crutzen (2006). Two classes of geoengineering solutions have developed: (1) methods to draw CO2 out of the atmosphere and sequester it in a relatively benign form; and (2) methods that change the energy flux entering or leaving the planet without modifying CO2 concentrations by, for example, changing the planetary albedo. Only the latter methods are considered here. Summaries of many of the methods, scientific questions, and issues of testing and implementation are discussed in Launder and Thompson (2009) and Royal Society (2009). The increased attention indicates that geoengineering is not a panacea and all strategies considered will have risks and consequences (e.g. Robock 2008, Trenberth and Dai 2007). Recent studies involving comprehensive Earth system models can provide insight into subtle interactions between components of the climate system. For example Rasch et al (2009) found that geoengineering by changing boundary clouds will not simultaneously 'correct' global averaged surface temperature, precipitation, and sea ice to present

  5. Technical challenges of sparing infrahyoid swallowing organs at risk in oropharynx squamous cell cancer treated with IMRT

    International Nuclear Information System (INIS)

    Morley, Lyndon; Tsang, Shirley W.S.; Breen, Stephen L.; Waldron, John N.; Maganti, Manjula; Pintilie, Melania; Dawson, Laura A.; Ringash, Jolie; Huang, Shao Hui; Kim, John

    2014-01-01

    This study reports clinical performance in the sparing of infrahyoid swallowing organs at risk (SWOARs) in oropharynx cancer intensity-modulated radiation therapy (IMRT) plans. Rates of meeting dose-volume planning goals are reported and compared with geometry-based estimates of what is achievable. This study also develops 3 measures of target-SWOAR geometry and tests their usefulness in providing geometry-based dose-volume planning goals. A total of 50 oropharynx cancer IMRT plans were reviewed. Success rates in meeting institutional dose-volume goals were determined for the glottic larynx (G), postcricoid pharynx (P), and esophagus (E). The following 3 measures of target-SWOAR geometry were investigated as methods of identifying geometry-based planning goals: presence of gross disease in neck levels 3 to 4, target-SWOAR overlap, and a 3-dimensional (3D) measure of target-SWOAR geometry. Locally advanced disease was predominant in this patient population with target volumes overlapping SWOARs in 68% to 98% of cases. Clinical rates of success in meeting dose-volume goals varied by SWOAR (16% to 82%) but compared well with estimated potentially achievable rates in most cases (14% average difference between clinical and potential). Cases grouped by the presence of levels 3 to 4 neck nodes or target-SWOAR overlap did not have significantly different SWOAR doses. Cases grouped using a 3D measure of target-SWOAR geometry differed significantly, providing useful geometry-based planning goals (e.g., mean Glottis dose <45 Gy was achieved 19%, 44%, or 81% of the time in each of 3 groups). This study describes the technical challenge of sparing SWOARs and investigates several potential methods for grouping cases to assist with treatment plan evaluation. Quantifying the 3-D relationship between the targets and SWOARs is a promising way of approaching this complex problem. Data presented in this paper may be useful to evaluate treatment plans using objective geometry

  6. Final report on a study of coherence in acceptability criteria for the technical aspects of risks associated with potentially hazardous installations

    International Nuclear Information System (INIS)

    Chicken, J.C.

    1988-01-01

    This report describes the results of the study that was made, under Contract No ECI-1390-B7221-85D, for the European Atomic Energy Community. The aim of the study was to examine and assess the feasibility of developing coherent and uniform criteria for judging the acceptability of the technical aspects of the risks associated with potentially hazardous installations. The report is arranged in five main parts. First the nature of hazardous installations is considered and this provides the basis for examination of the currently-used technical risk acceptability criteria. Next, the possible forms of criteria are explored and then universally consistent partial and overall technical risk acceptability criteria are proposed. Following this the implications of using the criteria proposed at the design, regulatory and operating levels are examined. Then, by testing the criteria against some real decisions, the practical problems of using the proposed criteria are explored. This leads to consideration of possible alternatives to the proposed criteria. Finally the conclusions that appear to be justified are summarized and the need for further work is identified

  7. Technical dialogue on High-level and Intermediate-level wastes. Risks during exploitation: co-activity

    International Nuclear Information System (INIS)

    Sene, Monique; Lheureux, Yves; Demet, Michel; Jaquet, Benoit; Gueritte, Michel; Rollinger, Francois; Le Bars, Igor; Bauduin, Eloi; Flachet, Margot; Besnus, Francois; Espivent, Camille; Tichauer, Michael; Serres, Christophe; Rocher, Muriel; Michel, Maurice; Perroud, Geraldine; Sauvage, Marite; Stupien, Maurice; Delamare, Thierry; Klajman, Irene; Castel, Cecile; Makhijani, Arjun; Pellegrini, Delphine; Dessaint, Anthony; Proust, Christophe; Gratton, Laura; Vinot, Thierry; Michel, Maurice; Demet, Michel

    2015-04-01

    This publication contains contributions and the content of debates on these contributions. After introduction speeches, a contribution on safety challenges during exploitation, and an overview of questions asked about these risks by the Citizen Conference, the following issues have been addressed: the accident of the American Isolation Pilot Plant with a fire and a radioactive release in 2014 (facts and analysis, other points of view, debate), fire risks in Cigeo as a major challenge which combines constraints related to mining activities and to the exploitation of a nuclear installation (IRSN point of view, debate), risks related to transportation, risks related to parallel surface and underground activities such as storage filling, digging, road traffic and so on (points of view of SNCF and ANDRA, debate), risk of radioactivity dispersion within Cigeo (problem description, IRSN point of view, debate), and exploitation risks within Cigeo (risks of explosion due to heat and hydrogen releases, IRSN point of view, debate)

  8. Technical writing versus technical writing

    Science.gov (United States)

    Dillingham, J. W.

    1981-01-01

    Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.

  9. Risk assessment of the retrieval of transuranic waste: Pads 1, 2, and 4, Technical Area-54, Area G Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Wilbert, K.A.; Lyon, B.F.; Hutchison, J.; Holmes, J.A.; Legg, J.L.; Simek, M.P.; Travis, C.C.; Wollert, D.A.

    1995-05-01

    The Risk Assessment for the Retrieval of Transuranic Waste is a comparative risk assessment of the potential adverse human health effects resulting from exposure to contaminants during retrieval and post-retrieval aboveground storage operations of post-1970 earthen-covered transuranic waste. Two alternatives are compared: (1) Immediate Retrieval and (2) Delayed Retrieval. Under the Immediate Retrieval Alternative, retrieval of the waste is assumed to begin immediately, Under the Delayed Retrieval Alternative, retrieval is delayed 10 years. The current risk assessment is on Pads 1, 2, and 4, at Technical Area-54, Area-G, Los Alamos National Laboratory (LANL). Risks are assessed independently for three scenarios: (1) incident-free retrieval operations, (2) incident-free storage operations, and (3) a drum failure analysis. The drum failure analysis evaluates container integrity under both alternatives and assesses the impacts of potential drum failures during retrieval operations. Risks associated with a series of drum failures are potentially severe for workers, off-site receptors, and general on-site employees if retrieval is delayed 10 years and administrative and engineering controls remain constant. Under the Delayed Retrieval Alternative, an average of 300 drums out of 16,647 are estimated to fail during retrieval operations due to general corrosion, while minimal drums are predicted to fail under the Immediate Retrieval Alternative. The results of the current study suggest that, based on risk, remediation of Pads 1, 2, and 4 at LANL should not be delayed. Although risks from incident-free operations in the Delayed Retrieval Alternative are low, risks due to corrosion and drum failures are potentially severe

  10. Risks from electricity generation systems in the far future. Proceedings of a technical committee meeting on approaches for estimating and comparing risks from energy systems in the far future. Working material

    International Nuclear Information System (INIS)

    1998-01-01

    Comparative risk assessment of the health and environmental impacts of electricity generation systems can be used for providing information for decisions concerning choice of electricity generation systems and regulation of the systems. Since the beginning of 1990s, there have been several major studies of comparative risk assessment that have advanced the methodology and knowledge for the assessment of health and environmental impacts of electricity production systems. In those studies, many methodological issues were identified, and it was found that one of the major issues that influenced the results was the time period included in the risk assessment. In the results of recent studies, the impacts for long time periods are influential because of the accumulation of the impacts for more than 100 years and the large uncertainties in the estimations. Examples of such long term impacts are those from global climate change and potential impacts from radionuclides ad non-radioactive pollutants originating from nuclear and other electricity generation systems. It is generally expected that the estimates for longer term impacts have greater uncertainty. In order to enhance the comparative risk studies and the application of the results, the methodology and key issues for estimating the impacts for future :generations should be investigated, and approaches for the assessments should be established. In this connection, the IAEA Technical Committee Meeting TCM on Approaches for Estimating and Comparing Risks from Energy Systems in the Far Future was held at the IAEA Headquarters in Vienna, Austria, from 6 to 10 October 1997. This material contains the proceedings of the TCM held in October 1997, and the latest draft of the technical report, Long-Term Risks from Electricity Generation Systems

  11. US-guided placement of temporary internal jugular vein catheters: immediate technical success and complications in normal and high-risk patients

    International Nuclear Information System (INIS)

    Oguzkurt, Levent; Tercan, Fahri; Kara, Gulcan; Torun, Dilek; Kizilkilic, Osman; Yildirim, Tulin

    2005-01-01

    Objective: : To evaluate the technical success and immediate complication rates of temporary internal jugular vein (IJV) haemodialysis catheter placement in normal and high-risk patients. Methods and materials: Two-hundred and twenty temporary internal jugular vein catheters inserted under ultrasound guidance in 172 patients were prospectively analyzed. Of 172 patients, 93 (54%) were males and 79 (46%) were females (age range, 18-83; mean, 56.0 years). Of 220 catheters, 171 (78%) were placed in patients who had a risk factor for catheter placement like patients with disorder of haemostasis, poor compliance, and previous multiple catheter insertion in the same IJV. Forty-seven (21.3%) procedures were performed on bed-side. A catheter was inserted in the right IJV in 178 procedures (80.9%) and left IJV in 42 procedures. Of 172 patients, 112 (65%) had only one catheter placement and the rest had had more than one catheter placement (range, 1-5). Results: Technical success was achieved in all patients (100%). Average number of puncture was 1.24 (range, 1-3). One hundred and eighty-three insertions (83.1%) were single-wall punctures, whereas 37 punctures were double wall punctures. Nine (4%) minor complications were encountered. Inadvertent carotid artery puncture without a sequel in four procedures (1.8%), oozing of blood around the catheter in three procedures (1.4%), a small hematoma in one procedure (0.4%), and puncture through the pleura in one procedure (0.4%) without development of pneumothorax. Oozing of blood was seen only in patients with disorder of haemostasis. Conclusion: Ultrasound-guided placement of internal jugular vein catheters is very safe with very high success rate and few complications. It can safely be performed in high-risk patients, like patients with disorders of haemostasis and patients with previous multiple catheter insertion in the same vein

  12. Overview on seismic evaluation and retrofitting within JICA Technical Cooperation Project on reduction of seismic risk in Romania

    International Nuclear Information System (INIS)

    Seki, M.; Vacareanu, R.; Pavel, M.; Lozinca, E.; Cotofana, D.; Chesca, B.; Georgescu, B.; Kaminosono, T.

    2007-01-01

    The objective of this paper is to give an overview on the seismic evaluation and retrofitting procedures of reinforced concrete buildings within JICA technical cooperation project in Romania. The content of the paper covers a) an outline of the seismic evaluation; history and comparison of Romanian seismic design codes with the Japanese seismic evaluation guidelines, b) an outline of the retrofitting techniques which were transferred from Japan to Romania and structural tests for retrofitting techniques employed in Romania and c) retrofitting details that were used by JICA/NCSRR in the retrofitting design of two vulnerable buildings in Bucharest. The above-mentioned retrofitting projects are now under development of detailed design and therefore, in the near future, refining and improvement of solutions will be performed. (authors)

  13. The acquisition of dangerous biological materials: Technical facts sheets to assist risk assessments of 46 potential BW agents

    Energy Technology Data Exchange (ETDEWEB)

    Aceto, Donato Gonzalo [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Astuto-Gribble, Lisa M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gaudioso, Jennifer M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2007-11-01

    Numerous terrorist organizations have openly expressed interest in producing and deploying biological weapons. However, a limiting factor for many terrorists has been the acquisition of dangerous biological agents, as evidenced by the very few successful instances of biological weapons use compared to the number of documented hoaxes. Biological agents vary greatly in their ability to cause loss of life and economic damage. Some agents, if released properly, can kill many people and cause an extensive number of secondary infections; other agents will sicken only a small number of people for a short period of time. Consequently, several biological agents can potentially be used to perpetrate a bioterrorism attack but few are likely capable of causing a high consequence event. It is crucial, from a US national security perspective, to more deeply understand the likelihood that terrorist organizations can acquire the range of these agents. Few studies have attempted to comprehensively compile the technical information directly relevant to the acquisition of dangerous bacteria, viruses and toxins. In this report, technical fact sheets were assembled for 46 potentially dangerous biological agents. Much of the information was taken from various research sources which could ultimately and significantly expedite and improve bioterrorism threat assessments. By systematically examining a number of specific agent characteristics included in these fact sheets, it may be possible to detect, target, and implement measures to thwart future terrorist acquisition attempts. In addition, the information in these fact sheets may be used as a tool to help laboratories gain a rudimentary understanding of how attractive a method laboratory theft is relative to other potential acquisition modes.

  14. Risk Assessments for Workers and the Population Following the Chernobyl Accident. Annex XI of Technical Volume 4

    International Nuclear Information System (INIS)

    2015-01-01

    The doses received by emergency workers at the Fukushima Daiichi NPP were much lower than those of the Chernobyl emergency workers (referred to as ‘liquidators’) and there is no evidence of an increased risk for Chernobyl workers below an equivalent dose of 150 mGy, so the inferred risks are expected to be small. Nevertheless, it is useful to adopt a similar modelling approach. The main estimates of radiation risks for the cohort of Chernobyl emergency workers who received moderate doses are in good quantitative agreement with the results for atomic bomb survivors if the linear non-threshold (LNT) model is used. The minimum latency period for radiation related solid cancers in the Russian cohort was estimated as four years. No statistically significant relationship was found between the thyroid cancer incidence and external radiation for the Russian cohort of liquidators

  15. Reference computations of public dose and cancer risk from airborne releases of plutonium. Nuclear safety technical report

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, V.L.

    1993-12-23

    This report presents results of computations of doses and the associated health risks of postulated accidental atmospheric releases from the Rocky Flats Plant (RFP) of one gram of weapons-grade plutonium in a form that is respirable. These computations are intended to be reference computations that can be used to evaluate a variety of accident scenarios by scaling the dose and health risk results presented here according to the amount of plutonium postulated to be released, instead of repeating the computations for each scenario. The MACCS2 code has been used as the basis of these computations. The basis and capabilities of MACCS2 are summarized, the parameters used in the evaluations are discussed, and results are presented for the doses and health risks to the public, both the Maximum Offsite Individual (a maximally exposed individual at or beyond the plant boundaries) and the population within 50 miles of RFP. A number of different weather scenarios are evaluated, including constant weather conditions and observed weather for 1990, 1991, and 1992. The isotopic mix of weapons-grade plutonium will change as it ages, the {sup 241}Pu decaying into {sup 241}Am. The {sup 241}Am reaches a peak concentration after about 72 years. The doses to the bone surface, liver, and whole body will increase slightly but the dose to the lungs will decrease slightly. The overall cancer risk will show almost no change over this period. This change in cancer risk is much smaller than the year-to-year variations in cancer risk due to weather. Finally, x/Q values are also presented for other applications, such as for hazardous chemical releases. These include the x/Q values for the MOI, for a collocated worker at 100 meters downwind of an accident site, and the x/Q value integrated over the population out to 50 miles.

  16. Assessment of technical risks and energy consumption of processes for regeneration of polluted land; Abschaetzung von technischem Risiko und Energiebedarf bei Sanierungsmassnahmen fuer Altlasten

    Energy Technology Data Exchange (ETDEWEB)

    Trappmann, F.

    1997-04-01

    In case of sensitive use of a site or its surroundings further consideration on pre-elevated remedial action designs should be undertaken. The generated method for the assessment of technical risks and energy consumption intends to enable different users with smaller or broader specialist knowledge to handle the problem. Basic instrument for the variation of intensity of handling is to divide the technical process in a special way into small elements, called module. With regard to the processing line and to the complexity of the process the modules are connected on different levels according to their common function. The levels handled by experts are called detailed risks assessment, the abridged kind of handling is especially for authorities. For some types of contaminations and some technologies are tools and lists available to enable an easier treatment. Generally the method and the tools are employable for other sites too. For the comparative assimilating assessment itself verbal argumentation is used to describe the causes, that modules are identified as weak (in comparison). The result of the consideration is a ranking of the prefered applied technologies rated by energy consumption and technical risks or a demand for special improvements in the case of commissioning. (orig.) [Deutsch] Die vorliegende Dissertation konzentriert sich auf die weitergehende Risiko- und Energiebetrachtung weniger, zuvor mittels strukturierter Auswahlverfahren favorisierter Sanierungsszenarien. Zwecks effizienter Ausnutzung verfuegbarer Finanzmittel erscheint es angemessen, die bislang in ihrer Gesamtheit betrachteten Verfahrensschritte intern eingehender zu untersuchen und potentielle Risiken bewertbar zu machen. Die geschilderte Vorgehensweise basiert auf der Untergliederung komplexer Sanierungsszenarien in einzelne Elemente (Moduln etc.) gemaess dem funktionalen Zusammenwirken und dem Verfahrensablauf. Fuer einzelne Moduln koennen im Rahmen detaillierterer Betrachtungen

  17. Yucca Mountain transportation routes: Preliminary characterization and risk analysis; Volume 2, Figures [and] Volume 3, Technical Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R. [Nevada Univ., Las Vegas, NV (United States). Transportation Research Center

    1991-05-31

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history.

  18. Scalability of a Methodology for Generating Technical Trading Rules with GAPs Based on Risk-Return Adjustment and Incremental Training

    Science.gov (United States)

    de La Cal, E. A.; Fernández, E. M.; Quiroga, R.; Villar, J. R.; Sedano, J.

    In previous works a methodology was defined, based on the design of a genetic algorithm GAP and an incremental training technique adapted to the learning of series of stock market values. The GAP technique consists in a fusion of GP and GA. The GAP algorithm implements the automatic search for crisp trading rules taking as objectives of the training both the optimization of the return obtained and the minimization of the assumed risk. Applying the proposed methodology, rules have been obtained for a period of eight years of the S&P500 index. The achieved adjustment of the relation return-risk has generated rules with returns very superior in the testing period to those obtained applying habitual methodologies and even clearly superior to Buy&Hold. This work probes that the proposed methodology is valid for different assets in a different market than previous work.

  19. A review of biological effects and potential risks associated with ultraviolet radiation as used in dentistry. Technical report

    International Nuclear Information System (INIS)

    Mills, L.F.; Lytle, C.D.; Andersen, F.A.; Hellman, K.B.; Bockstahler, L.E.

    1975-10-01

    Several dental procedures, recently developed and currently in use by the dental profession, involve the use of near or far ultraviolet (UV) radiation in the oral cavity. Recent studies on the biological effects of near and far UV radiation suggest potential risks to individuals from excessive UV exposure. In this paper the dental procedures are briefly described, the bases for UV safety standards are reviewed, effects of UV exposure to the skin and eyes and how these effects may relate to oral mucosa exposure are considered, potential modes of action by UV radiation on oral tissues as suggested by cell culture studies are summarized, and potential risks from UV exposure of individuals which might result from the dental procedures are discussed

  20. Imagining Technicities

    DEFF Research Database (Denmark)

    Liboriussen, Bjarke; Plesner, Ursula

    2011-01-01

    to the elements of taste and skill. In the final analysis those references were synthesized as five imagined technicities: the architect, the engineer, the client, the Chinese, and the Virtual World native. Because technicities are often assumed and rarely discussed as actants who influence practice, their role......, this article focuses on innovative uses of virtual worlds in architecture. We interviewed architects, industrial designers and other practitioners. Conceptually supported by an understanding of technicity found in Cultural Studies, the interviews were then coded with a focus on interviewees’ references...... in cooperation and development of ICTs seems to pass unnoticed. However, since they are aligned into ICTs, technicities impact innovation....

  1. Statistical model for assessing the risk of hail damage to any ground installation. Technical report, June 1978-March 1979

    Energy Technology Data Exchange (ETDEWEB)

    Cox, M; Armstrong, P R

    1979-09-01

    This report describes a statistical model which has been developed to determine the risk of damage by large hail to any ground installation (such as a solar flat plate collector). The model is based on data for the number of haildays per year, hailstone size distribution, and storm severity (expressed in number of hailstones per square meter per storm). Other than parameters derived from the raw meteorological data available, the parameters of the model are the number of years of surface exposure and the exposure area size. The end result is the probability of a hailstone of a given size striking a given surface area in a given number of years. The maximum probable hailstone size is used as a convenient index of hail risk. The data upon which to base a prediction model are sparse at this time, covering few geographic locations; much of the information available is deficient in sampling consistency and/or sample size. For this reason, this report fully documents the derivation and use of the model for future applications, when more and better data are collected. The FORTRAN source code to calculate the risk model digitally is included in APPENDIX D. This model improves on previous work in: (1) the use of more thorough statistical procedures and a more rigorous accounting of storm severity; (2) a more thorough investigation into the two probability density distributions commonly used (Poisson and negative binomial) to describe hailday frequencies, and (3) an attempt to define more rigorously the distribution of hailstone sizes. A sensitivity analysis was performed and conclusions are drawn from the results.

  2. Status and risk assessment of the use of transgenic arthropods in plant protection. Proceedings of a technical meeting

    International Nuclear Information System (INIS)

    2006-03-01

    New developments in the modern biotechnology have opened up the possibility of introducing genes into the germline of many insect species, including those of agricultural importance. This technology offers the potential to improve current pest control strategies that incorporate the Sterile Insect Technique (SIT). Potential improvements include the development of strains that (1) produce only male insects for sterilization and release and (2) carry a marker that distinguishes them from wild insects. There are many institutions involved in the development of transgenic insect technology both for studies on basic gene regulation and for the creation of transgenic strains for use in a wide range of insect control programmes. It has been realized that the release into the environment of transgenic insects will not be an easy process considering the current public sensitivities in this area. The fact that insects are mobile and that once released cannot be recalled creates much concern. If fertile transgenic insects were to be released in any type of control programme, then the transgene would enter the wild population through mating. This strategy is fraught with, as yet, unknown risks and it is inconceivable that regulatory approval will be given for such a release in the near future. However, when transgenic strains are integrated into a sterile insect release then the concerns about transmission of the transgene to the wild population disappear as the matings between the released and the wild insects are sterile. This scenario is likely to be the first type of transgenic release. Insects that are currently released in SIT programmes experience no significant regulatory problems, but this will not be the case if the insects that are released are transgenic, even if they are sterile. The meeting Status and Risk Assessment of the Use of Transgenic Arthropods in Plant Protection held in FAO Headquarters, Rome, in April 2002 was the first effort to bring together

  3. Real-time biofeedback to target risk of anterior cruciate ligament injury: a technical report for injury prevention and rehabilitation.

    Science.gov (United States)

    Ford, Kevin R; DiCesare, Christopher A; Myer, Gregory D; Hewett, Timothy E

    2015-05-20

    Biofeedback training enables an athlete to alter biomechanical and physiological function by receiving biomechanical and physiological data concurrent with or immediately after a task. To compare the effects of 2 different modes of real-time biofeedback focused on reducing risk factors related to anterior cruciate ligament injury. Randomized crossover study design. Biomechanics laboratory and sports medicine center. Female high school soccer players (age 14.8 ± 1.0 y, height 162.6 ± 6.8 cm, mass 55.9 ± 7.0 kg; n = 4). A battery of kinetic- or kinematic-based real-time biofeedback during repetitive double-leg squats. Baseline and posttraining drop vertical jumps were collected to determine if either feedback method improved high injury risk landing mechanics. Maximum knee abduction moment and angle during the landing was significantly decreased after kinetic-focused biofeedback (P = .04). The reduced knee abduction moment during the drop vertical jumps after kinematic-focused biofeedback was not different (P = .2). Maximum knee abduction angle was significantly decreased after kinetic biofeedback (P < .01) but only showed a trend toward reduction after kinematic biofeedback (P = .08). The innovative biofeedback employed in the current study reduced knee abduction load and posture from baseline to posttraining during a drop vertical jump.

  4. Availability and use of medical isotopes in Canada : performed as part of a radiological terrorism risk assessment. Technical memorandum

    International Nuclear Information System (INIS)

    Larsson, C.L.

    2004-12-01

    An assessment of the availability of radioactive material used for medical applications in Canada has been performed as part of the CBRN Research and Technology Initiative (CRTI) Project CRTI-02-0024RD (Probabilistic Risk Assessment Tool for Radiological Dispersal Devices). A general list of medical radioisotopes used worldwide was compiled via literature searches and Internet investigations. This list was then compared to all isotopes licenced to healthcare facilities in Canada. Sources of lesser concern for this study, such as noble gases, short-lived isotopes, and radioisotopes not licenced for medical applications in Canada, were eliminated. The remaining sources were then analysed for frequency of use and maximum licenced activity to assess which materials would be of highest concern in relation to radiological terrorism. A detailed description of the application, typical administered activity, and other relevant information for these most common and highest licenced activity medical sources was assembled to feed directly into the risk assessment database. A general discussion of security in healthcare facilities is also given. Due to the constant advances made in medicine, the information relating to licenced isotopes is dynamic and thus requires updating to ensure the database is kept current. (author)

  5. Food and feed chemical contaminants in the European Union: Regulatory, scientific, and technical issues concerning chemical contaminants occurrence, risk assessment, and risk management in the European Union.

    Science.gov (United States)

    Silano, Marco; Silano, Vittorio

    2017-07-03

    A priority of the European Union is the control of risks possibly associated with chemical contaminants in food and undesirable substances in feed. Following an initial chapter describing the main contaminants detected in food and undesirable substances in feed in the EU, their main sources and the factors which affect their occurrence, the present review focuses on the "continous call for data" procedure that is a very effective system in place at EFSA to make possible the exposure assessment of specific contaminants and undesirable substances. Risk assessment of contaminants in food atances in feed is carried currently in the European Union by the CONTAM Panel of EFSA according to well defined methodologies and in collaboration with competent international organizations and with Member States.

  6. Investigation of the modes of origin of attitudes concerning the risks of large-scale technical plants

    International Nuclear Information System (INIS)

    Gutmann, G.; Huschke, P.

    1980-12-01

    A hypothetical framework of the modes of origin of attitudes concerning the risks of large-scale industrial plants is developed. The hypotheses regarding the assessment of nuclear energy are empirically investigated in several schools, the pupils being between 14 and 16 years old. Results: 1. the ''polarity'' of opinion patterns on the problem of nuclear energy ''brought along'', i.e. already coined within the families could not be reversed by school instruction. 2. Instruction can possibly differentiate attitudes (assessments and cognitions). 3. Obviously the teaching style of the teacher is more determining for a differentiated attitude towards nuclear energy than the instruction material used. 4. A teaching style supporting and activating differentiation can be called partner-orientated and ''provocative'' and be considered as taking into consideration the communicative situations in school classes in a flexible manner. 5. On the other hand, a frontal and monologizing teaching style which does not respond to the changing communicative structures in school classes can block all interest and thus the possibility of influencing attitudes. (orig./HP) [de

  7. Technical Network

    CERN Multimedia

    2007-01-01

    In order to optimize the management of the Technical Network (TN), to ease the understanding and purpose of devices connected to the TN, and to improve security incident handling, the Technical Network Administrators and the CNIC WG have asked IT/CS to verify the "description" and "tag" fields of devices connected to the TN. Therefore, persons responsible for systems connected to the TN will receive email notifications from IT/CS asking them to add the corresponding information in the network database. Thank you very much for your cooperation. The Technical Network Administrators & the CNIC WG

  8. Technical Network

    CERN Multimedia

    2007-01-01

    In order to optimise the management of the Technical Network (TN), to facilitate understanding of the purpose of devices connected to the TN and to improve security incident handling, the Technical Network Administrators and the CNIC WG have asked IT/CS to verify the "description" and "tag" fields of devices connected to the TN. Therefore, persons responsible for systems connected to the TN will receive e-mails from IT/CS asking them to add the corresponding information in the network database at "network-cern-ch". Thank you very much for your cooperation. The Technical Network Administrators & the CNIC WG

  9. RADTRAN 6 Technical Manual

    Energy Technology Data Exchange (ETDEWEB)

    Weiner, Ruth F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Neuhauser, Karen Sieglinde [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Heames, Terence John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); O' Donnell, Brandon M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Dennis, Matthew L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-01-01

    This Technical Manual contains descriptions of the calculation models and mathematical and numerical methods used in the RADTRAN 6 computer code for transportation risk and consequence assessment. The RADTRAN 6 code combines user-supplied input data with values from an internal library of physical and radiological data to calculate the expected radiological consequences and risks associated with the transportation of radioactive material. Radiological consequences and risks are estimated with numerical models of exposure pathways, receptor populations, package behavior in accidents, and accident severity and probability.

  10. RADTRAN 6 technical manual.

    Energy Technology Data Exchange (ETDEWEB)

    Weiner, Ruth F.; Neuhauser, Karen Sieglinde; Heames, Terence John; O' Donnell, Brandon M.; Dennis, Matthew L.

    2014-01-01

    This Technical Manual contains descriptions of the calculation models and mathematical and numerical methods used in the RADTRAN 6 computer code for transportation risk and consequence assessment. The RADTRAN 6 code combines user-supplied input data with values from an internal library of physical and radiological data to calculate the expected radiological consequences and risks associated with the transportation of radioactive material. Radiological consequences and risks are estimated with numerical models of exposure pathways, receptor populations, package behavior in accidents, and accident severity and probability.

  11. Technical Note

    African Journals Online (AJOL)

    Administratör

    In this report on four patients, we did not use any of these techniques. The existence and the site of the fistulas was clearly demonstrated using basic but important preoperative detailed assessment and two intraoperative findings. The preoperative referral note that indicated the site of technical difficulty during the previous ...

  12. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball

    2010-01-01

    Operational Experience At the end of the first full-year running period of LHC, CMS is established as a reliable, robust and mature experiment. In particular common systems and infrastructure faults accounted for <0.6 % CMS downtime during LHC pp physics. Technical operation throughout the entire year was rather smooth, the main faults requiring UXC access being sub-detector power systems and rack-cooling turbines. All such problems were corrected during scheduled technical stops, in the shadow of tunnel access needed by the LHC, or in negotiated accesses or access extensions. Nevertheless, the number of necessary accesses to the UXC averaged more than one per week and the technical stops were inevitably packed with work packages, typically 30 being executed within a few days, placing a high load on the coordination and area management teams. It is an appropriate moment for CMS Technical Coordination to thank all those in many CERN departments and in the Collaboration, who were involved in CMS techni...

  13. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball

    2010-01-01

    Operational Experience Since the closure of the detector in February, the technical operation of CMS has been quite smooth and reliable. Some minor interventions in UXC were required to cure failures of power supplies, fans, readout boards and rack cooling connections, but all these failures were repaired in scheduled technical stops or parasitically during access dedicated to fixing LHC technical problems. The only occasion when CMS had to request an access between fills was to search for the source of an alarm from the leak-detection cables mounted in the DT racks. After a few minutes of diagnostic search, a leaking air-purge was found. Replacement was complete within 2 hours. This incident demonstrated once more the value of these leak detection cables; the system will be further extended (during the end of year technical stop) to cover more racks in UXC and the floor beneath the detector. The magnet has also been operating reliably and reacted correctly to the 14s power cut on 29 May (see below). In or...

  14. Technical endoscopy

    International Nuclear Information System (INIS)

    Cavalar, K.O.

    1988-01-01

    A survey is provided on different versions of endoscopes, taking into account the new developments of video endoscopy. With a variety of practical examples it is shown that technical tests using endoscopy are a demanding task for nondestructive testing, whose requirements can only be met on a customized basis. (orig./HP) [de

  15. Technical Training: Technical Training Seminar

    CERN Multimedia

    2004-01-01

    TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch Monday 9 February 2004 From 10:00 to 12:00 - IT Auditorium - bldg. 31, 3rd floor ANSOFT High-Frequency Seminar David Prestaux, Application Engineer, ANSOFT F-78535 BUC, France This Technical Training seminar will present two Ansoft application products: Ansoft HFSS and Ansoft Designer. Ansoft HFSS makes use of the Finite Element Method (FEM) to calculate field solutions from first principles. It can accurately predict all high-frequency behaviours such as dispersion, mode conversion, and losses due to materials and radiation. Ansoft Designer is a suite of design tools to fully integrate high-frequency, physics-based electromagnetic simulations into a seamless system-level simulation environment. Ansoft Designer uses a simple interface to give complete control over every design task, by a method allowing multiple solvers, Solver on Demand. • Introduction • Overview of the Ansoft Total solution • Ansoft HFSS 9...

  16. The Risk of Striking Accidents During LPG Ships Passage in Ports in Respect to Technical Failures based on Real Time Simulations in Szczecin-Świnoujście Waterway

    Directory of Open Access Journals (Sweden)

    Bąk Andrzej

    2016-10-01

    Full Text Available The method of risk assessment based on ship systems technical failures during the passage in the region of Świnoujście of the large LPG (liquefied petroleum gas tanker is presented. The statistical reliability indicators and the simulation model of ships manoeuvring. The researches carried out within this paper let to determine the safety level and necessary tug escort service during the passage of the ship with the hazardous cargo in the port area.

  17. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball

    Overview From a technical perspective, CMS has been in “beam operation” state since 6th November. The detector is fully closed with all components operational and the magnetic field is normally at the nominal 3.8T. The UXC cavern is normally closed with the radiation veto set. Access to UXC is now only possible during downtimes of LHC. Such accesses must be carefully planned, documented and carried out in agreement with CMS Technical Coordination, Experimental Area Management, LHC programme coordination and the CCC. Material flow in and out of UXC is now strictly controlled. Access to USC remains possible at any time, although, for safety reasons, it is necessary to register with the shift crew in the control room before going down.It is obligatory for all material leaving UXC to pass through the underground buffer zone for RP scanning, database entry and appropriate labeling for traceability. Technical coordination (notably Stephane Bally and Christoph Schaefer), the shift crew and run ...

  18. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball and W. Zeuner

    2011-01-01

    In this report we will review the main achievements of the Technical Stop and the progress of several centrally-managed projects to support CMS operation and maintenance and prepare the way for upgrades. Overview of the extended Technical Stop  The principal objectives of the extended Technical Stop affecting the detector itself were the installation of the TOTEM T1 telescopes on both ends, the readjustment of the alignment link-disk in YE-2, the replacement of the light-guide sleeves for all PMs of both HFs, and some repairs on TOTEM T2 and CASTOR. The most significant tasks were, however, concentrated on the supporting infrastructure. A detailed line-by-line leak search was performed in the C6F14 cooling system of the Tracker, followed by the installation of variable-frequency drives on the pump motors of the SS1 and SS2 tracker cooling plants to reduce pressure transients during start-up. In the electrical system, larger harmonic filters were installed in ...

  19. Technical Training: Technical Training Seminar

    CERN Multimedia

    2004-01-01

    Tuesday 30 March TECHNICAL TRAINING SEMINAR From 9:00 to 12:00 and from 13:00 to 16:00 hrs - Council Chamber, Salle B, Salle des Pas Perdus National Instruments (NI) on Tour 2004 Claudia Jüngel, Evrem Yarkin, Joel Clerc, Hervé Baour / NATIONAL INSTRUMENTS The special event NI on Tour 2004, run in Germany, Austria and Switzerland, will be at CERN on March 30. Technical seminars and free introductory courses will be offered all day long in the Council Chamber, Salle B, and Salle des Pas Perdus (buildings 61 and 503). Technical conferences: 09:00 - 12:00 Data acquisition systems on PCs. Industrial measurement and control techniques. 13:00 - 16:00 Advanced LabVIEW software and PXI instrumentation. Measuring instruments and system components for teststand automation. Introductory courses: 09:00 - 12:00 DIAdem: Data analysis and presentation 13:00 - 16:00 Data acquisition with LabVIEW Language: English and French Free special seminar. Registration is recommended with National Instruments Switzerland (please sp...

  20. Technical Training: Technical Training Seminar

    CERN Multimedia

    2004-01-01

    Tuesday 30 March TECHNICAL TRAINING SEMINAR From 9:00 to 12:00 and from 13:00 to 16:00 hrs - Council Chamber, Salle B, Salle des Pas Perdus National Instruments (NI) on Tour 2004 Claudia Jüngel, Evrem Yarkin, Joel Clerc, Hervé Baour / NATIONAL INSTRUMENTS The special event NI on Tour 2004, run in Germany, Austria and Switzerland, will be at CERN on March 30. Technical seminars and free introductory courses will be offered all day long in the Council Chamber, Salle B, and Salle des Pas Perdus (buildings 61 and 503). Technical conferences: 09:00 - 12:00 Data acquisition systems on PCs. Industrial measurement and control techniques. 13:00 - 16:00 Advanced LabVIEW software and PXI instrumentation. Measuring instruments and system components for teststand automation. Introductory courses: 09:00 - 12:00 DIAdem: Data analysis and presentation 13:00 - 16:00 Data acquisition with LabVIEW Language: English and French Free special seminar. Registration is recommended with National Instruments Swi...

  1. INDOT Technical Training Plan : [Technical Summary

    Science.gov (United States)

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  2. TECHNICAL COORDINATION

    CERN Document Server

    A. Ball and W. Zeuner

    2013-01-01

    For the reporting period, the CMS common systems and infrastructure worked well, without failures that caused significant data losses. One more disconnection of the magnet cold box occurred in the shadow of interruptions in data taking, caused by a series of technical faults. The recognition during 2012 that re-connection can only safely be done at around 2 T implies a minimum magnet recovery time of 12 hours and raises serious concerns about the number of ramping cycles of the magnet these incidents cause. This has triggered studies of how to make the cryo-system of the magnet more robust against failures. The proton-proton run ended just before the end-of-year CERN closure, during which CASTOR was installed on the negative end of CMS and both ZDC calorimeters were installed in TAN absorbers the LHC tunnel, in preparation for the heavy-ion run. The installation of CASTOR was an excellent “engineering test” of procedures for working in an activated environment. Despite some technical pr...

  3. TECHNICAL COORDINATION

    CERN Multimedia

    Austin Ball

    Summary of progress since last CMS week. Ten years of construction work have been completed. CMS is closed, in very close to the ideal low luminosity configuration, and performed well in the first tests with LHC beam. Behind this encouraging news is the story of a summer of intense commitment by many teams (from the collaboration and 3 CERN departments) working together, against the clock and despite many minor setbacks, to ensure that the experiment was ready to play a leading role in the excitement of September 10. Following beampipe bakeout and refill with pure neon, a magnificent effort by the ECAL group and the pt 5 technical crew made it possible to install and commission all 4 ECAL endcap Dees before the end of August. In the shadow of this activity, the barrel and forward pixel trackers and part of the beam monitoring were installed within the vac tank. The pt 5 technical teams then succeeded in safely removing the 20t installation tables and their support blocks from beneath the already installed ...

  4. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball and W. Zeuner

    2011-01-01

      Operational experience 2011 CMS is approaching the end of a very successful year of operation. Proton- proton running ended in the late afternoon of 30th October with a stunning 5.73 fb–1 delivered by LHC, of which CMS recorded 5.22 fb–1. During heavy-ion operation, which continues until 7th December, both the accelerator and the CMS detector have also performed very well. Despite the encouraging overall reliability of technical operation, several infrastructure failures which occurred since the last Bulletin are worthy of mention, with one leading for the first time to significant data-loss. On 10th July, a CERN-wide power failure brought down essentially all services including the magnet, due to an MCS setting being left in “manual” after the recent technical stop, but there was no significant damage and the detector was operational before the LHC, despite a slow and tortuous recovery (one of several indications this year that there is room for improve...

  5. Geographic patterns of at-risk species: A technical document supporting the USDA Forest Service Interim Update of the 2000 RPA Assessment

    Science.gov (United States)

    Curtis H. Flather; Michael S. Knowles; Jason McNees

    2008-01-01

    This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974. It updates past reports on the trends and geographic patterns of species formally listed as threatened or endangered under the Endangered Species Act of 1973. We...

  6. Influence able and Avoidable Risk Factors for Systemic Air Embolism due to Percutaneous CT-Guided Lung Biopsy: Patient Positioning and Coaxial Biopsy Technique-Case Report, Systematic Literature Review, and a Technical Note

    International Nuclear Information System (INIS)

    Rott, G.; Boecker, F.

    2014-01-01

    Following the first case of a systemic air embolism due to percutaneous CT-guided lung biopsy in our clinic we analysed the literature regarding this matter in view of influence able or avoidable risk factors. A systematic review of literature reporting cases of systemic air embolism due to CT-guided lung biopsy was performed to find out whether prone positioning might be a risk factor regarding this issue. In addition, a technical note concerning coaxial biopsy practice is presented. Prone position seems to have relevance for the development and/or clinical manifestation of air embolism due to CT-guided lung biopsy and should be considered a risk factor, at least as far as lesions in the lower parts of the lung are concerned. Biopsies of small or cavitary lesions in coaxial technique should be performed using a hemo static valve.

  7. Technical presentation

    CERN Multimedia

    GS Department

    2010-01-01

    10 March 2010 DYNEOS 10:00 – 12:00 - Main Building, Room B, 61-1-009 Dyneos AG is active in the fields of photonics, laser and high-precision positioning. Our highly qualified engineer team has more than 30 years of experience in electro-optical solutions sales. The engineers are supported by a technical and administrative team. We are focused on the Swiss market and represent six suppliers (Coherent, PI Physik Instrumente, SIOS, Nanonics Imaging, APE, Ekspla) in order to give a qualified sales and service support to our customers. Our products are dedicated to the research field as well as to industry. In addition to standard catalog products, we offer custom designs to fulfill the specific needs of OEM customers or specific applications.

  8. Technical presentation

    CERN Document Server

    FP Department

    2009-01-01

    07 April 2009 Technical presentation by Leuze Electronics: 14.00 – 15.00, Main Building, Room 61-1-017 (Room A) Photoelectric sensors, data identification and transmission systems, image processing systems. We at Leuze Electronics are "the sensor people": we have been specialising in optoelectronic sensors and safety technology for accident prevention for over 40 years. Our dedicated staff are all highly customer oriented. Customers of Leuze Electronics can always rely on one thing – on us! •\tFounded in 1963 •\t740 employees •\t115 MEUR turnover •\t20 subsidiaries •\t3 production facilities in southern Germany Product groups: •\tPhotoelectric sensors •\tIdentification and measurements •\tSafety devices

  9. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball and W. Zeuner

    2010-01-01

    Overview Once again, the bulk of this article reviews the intense activity of a recently completed shutdown, which, although quite unforeseeable until a few weeks before it started, proved by its success that our often advertised capability to conduct major maintenance within a two month period is real. Although safely completed, on-time to remarkable precision, the activity was not without incident, and highlighted our dependence on many experienced, specialist teams and their precise choreography. Even after the yoke was safely closed, magnet re-commissioning and beampipe pumpdown showed new and thought-provoking behaviour. The struggle to maintain adequate technical resources will be a pre-occupation over the coming months, in parallel with the start of truly sustained operation, for which various procedures are still being put in place. Planning for future shutdowns must now become a high priority, with many working groups and task forces already in existence to prepare infrastructure improvements and to...

  10. Technical presentation

    CERN Document Server

    FI Department

    2008-01-01

    RADIOSPARES, the leading catalogue distributor of components (electronic, electrical, automation, etc.) and industrial supplies will be at CERN on Friday 3 October 2008 (Main Building, Room B, from 9.00 a.m. to 3.00 p.m.) to introduce its new 2008/2009 catalogue. This will be the opportunity for us to present our complete range of products in more detail: 400 000 part numbers available on our web site (Radiospares France, RS International, extended range of components from other manufacturers); our new services: quotations, search for products not included in the catalogue, SBP products (Small Batch Production: packaging in quantities adapted to customers’ requirements); partnership with our focus manufacturers; demonstration of the on-line purchasing tool implemented on our web site in conjunction with CERN. RADIOSPARES will be accompanied by representatives of FLUKE and TYCO ELECTRONICS, who will make presentations, demonstrate materials and answer any technical questio...

  11. Technical Training: Technical Training Seminar

    CERN Multimedia

    2004-01-01

    TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch Tuesday 3 February 2004 From 09:00 to 13:30 - Training Centre Auditorium - bldg. 593, room 11 USB (Universal Serial Bus) CYPRESS Seminar Claudia Colombini, Field Application Engineer CYPRESS ActiveComp Electronic GmbH D-85077 MANCHING, Germany As a pioneer in USB, CYPRESS sets the standard for cost-effective solutions without sacrificing functionality, performance or reliability. Having shipped over 200 million USB devices, Cypress is the undisputed market leader and demonstrates unmatched USB expertise. With the industry's broadest selection of USB solutions, Cypress has the right silicon, software and support for every USB application, from Low-speed to High-Speed and USB On-The-Go (OTG). 9:00 - 10:30 Overview of USB systems. USB CYPRESS product overview. Peripherals: Low Speed, Full Speed, High Speed (1.1 and 2.0). Hub Solutions, Embedded Host Solutions, On-The-Go (OTG) and wireless USB. USB Development Tools (first part) 10:30 -...

  12. Summary of the technical report on estimating the impact of key programmatic risk allocation decisions on Phase 1 bids and U.S. Department of Energy costs

    International Nuclear Information System (INIS)

    Keisler, J.M.; Buehring, W.A.

    1996-05-01

    The US Department of Energy (DOE) is privatizing the processing of hazardous and radioactive tank waste at the Hanford Site in Washington State. As part of the privatization process, a request for proposals describing the conditions and DOE's expectations for contractor performance and responsibilities was issued. Argonne National Laboratory and Pacific Northwest National Laboratory collaborated to analyze programmatic risks and costs associated with privatization. They examined nine major risks to determine financial impacts on the prospective vendors and DOE for three alternative risk allocations: (1) DOE bears the risk, (2) the vendor bears the risk, or (3) the risk is shared. With the help of a subject-matter expert, each risk was characterized by estimating potential consequences and likelihood of occurrence. A financial risk model was developed to estimate the total cost to DOE for a given risk allocation strategy covering all nine risks. Results showed that it is financially advantageous to DOE to bear some risks, share some others, and assign some to the vendor

  13. TECHNICAL COORDINATION

    CERN Multimedia

    Austin Ball

    2013-01-01

      Since the last report, much visible progress has been made, as the LS1 programme approaches the halfway point. From early October, technical and safety shift-crew have been present around the clock, allowing detectors to stay switched on overnight, ensuring that safety systems are operational and instructions for non-expert shift-crew are clear. LS1 progress Throughout the summer, whilst the solenoid vacuum tank and YB0 surfaces were accessible, an extensive installation programme took place to prepare for Tracker colder operation and the PLT installation, in 2014, the Phase 1 Pixel Tracker installation, in 2016–’17, and the HCAL Phase 1 upgrade completion, ending in LS2. This included pipework for N2 or dry air to flush the Tracker bulkhead region, many sensors to monitor temperature and dew point in the Tracker and its service channels, heating wires outside the Tracker cooling bundles, supports for the new vacuum-jacketed, concentric, CO2 Pixel cooling lines, the PLT cool...

  14. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball and W. Zeuner

    2012-01-01

      UXC + detectors As explained in detail in the November 2011 bulletin, the bellows unit at −18.5 m from the CMS interaction point was identified as a prime candidate for the regularly occurring pressure spikes which occasionally led to sustained severe background conditions in 2011, affecting dead time and data quality. Similar regions in LHC with vacuum instabilities were observed to be close to bellows, which radiography showed to have distorted RF-fingers — on removal, they proved to have been severely overheated. The plans for the Year-End Technical Stop were adapted to prioritise radiography of the bellows at 16 m to 18 m either end of CMS. Excellent work by the beam pipe, survey and heavy mechanical teams allowed the X-rays to be taken as planned on 20th December, showing that the bellow at −18.5m had an obvious non-conformity. The RF-fingers were found inside the end of the opposing flared pipe instead of outside. In addition, the overlap between fingers and...

  15. Risk

    Science.gov (United States)

    Cole, Stephen R.; Hudgens, Michael G.; Brookhart, M. Alan; Westreich, Daniel

    2015-01-01

    The epidemiologist primarily studies transitions between states of health and disease. The purpose of the present article is to define a foundational parameter for such studies, namely risk. We begin simply and build to the setting in which there is more than 1 event type (i.e., competing risks or competing events), as well as more than 1 treatment or exposure level of interest. In the presence of competing events, the risks are a set of counterfactual cumulative incidence functions for each treatment. These risks can be depicted visually and summarized numerically. We use an example from the study of human immunodeficiency virus to illustrate concepts. PMID:25660080

  16. Technical innovation and management

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Yang Cheol

    1982-08-15

    This book gives explanations of the conception of technical innovation, development plan in Korea, connection between technology and a growth factor in national income, problem of technical innovation in developing country, analysis on cooperation between a developed country and a developing country, evaluation and strategy of technical development in Korea, technical innovation of industry, management of technical industry, analysis of special condition in Korea.

  17. Technical innovation and management

    International Nuclear Information System (INIS)

    Yoon, Yang Cheol

    1982-08-01

    This book gives explanations of the conception of technical innovation, development plan in Korea, connection between technology and a growth factor in national income, problem of technical innovation in developing country, analysis on cooperation between a developed country and a developing country, evaluation and strategy of technical development in Korea, technical innovation of industry, management of technical industry, analysis of special condition in Korea.

  18. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    KRIPPS, L.J.

    2005-03-03

    This document describes the qualitative evaluation of frequency and consequences for DST and SST representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant structures, systems and components (SSCs) and/or technical safety requirements (TSRs) were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support WP-13033, Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  19. NWMO transportation technical work program

    International Nuclear Information System (INIS)

    Hatton, C.

    2015-01-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  20. NWMO transportation technical work program

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, C. [Nuclear Waste Management Organization, Toronto, ON (Canada)

    2015-07-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  1. Procedures for evaluating technical specifications (PETS)

    International Nuclear Information System (INIS)

    Samanta, P.K.; Boccio, J.L.; Vesely, W.E.

    1987-01-01

    In this paper, aspects of technical specifications relating to Generic Issues B-56 and B-61 are discussed from a risk-standpoint. These primarily deal with the risk issues associated with (1) adaptive diesel test requirements/surveillance test intervals, and (2) the effectiveness of cumulative outage time requirements for controlling downtime risk. Risk and reliability approaches are presented which (1) allow risk-acceptable test intervals to be determined for any diesel and (2) show the potential risk-control capability of prescribed allowed cumulative outage times. This work was conducted through NRC's Procedures for Evaluating Technical Specifications (PETS) Program. The overall objective of this program is to develop and demonstrate methodologies that utilize risk insights and reliability techniques for evaluating the scope, detailed requirements, and safety impact of plant technical specifications

  2. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball

    Although the incident on 19th September brought an untimely, temporary close to the exciting and successful commissioning of CMS with beam, activity at point 5 resumed with barely reduced intensity once underground access was restored. The preliminary steps were to re-fill the beamipe to atmospheric pressure with pure neon gas, to de-classify the cavern for radiological risks and to get agreement for formally deferring screening and tracing of material extracted from UXC. As planned, attention was then focused on completing commissioning of the solenoid, whose progression towards nominal 3.8 Tesla operating field had been interrupted a few shifts from its conclusion. Additional mechanical restraints and shielding structures needed to be installed to control the effects of field escaping from the return yoke and finding other pathways between the magnet poles. Certain pumps, sensors, lights and cameras, absent during the extensive “MTCC” surface testing in 2006, needed to be protected, w...

  3. Risks and opportunities of technical self-management in the context of liberalization; Risiken und Chancen der technischen Selbstverwaltung im Umfeld der Liberalisierung

    Energy Technology Data Exchange (ETDEWEB)

    Merkel, W. [Deutscher Verein des Gas- und Wasserfaches e.V., Bonn (Germany)

    1998-12-31

    The proven self-management of the gas and water industry is founded on an expedient division of labour between the legislator/supervisory authority and the supply industry which ensures security, dependability and quality of supply under its own responsibility using the technical regulatory provisions of the technical and scientific associations (DVGW). Consensus on this division of labour seems to be endangered by the change in the underlying economic conditions in Europe. How can proven elements of the supply structure be preserved and how can liberalization be seen as an opportunity for the future in the interests of the reliable and economical supply of gas and water to citizens? (orig.) [Deutsch] Die bewaehrte Selbstverwaltung des Gas- und Wasserfaches beruht auf einer zweckmaessigen Arbeitsteilung zwischen Gesetzgeber/Aufsichtsbehoerde und Versorgungswirtschaft, die ueber die technischen Regelwerke ihrer technisch-wissenschaftlichen Vereine (DVGW) in eigener Verantwortung Sicherheit, Zuverlaessigkeit und Qualitaet der Versorgung gewaehrleistet. Der Konsens ueber diese Arbeitsteilung scheint gefaehrdet durch die Veraenderung der wirtschaftlichen Rahmenbedingungen in Europa. Wie koennen bewaehrte Elemente der Versorgungsstruktur bewahrt, wie laesst sich die Liberalisierung als Chance fuer die Zukunft im Interesse sicherer und wirtschaftlicher Versorgung des Buergers mit Gas und Wasser begreifen?

  4. Risk

    Science.gov (United States)

    Barshi, Immanuel

    2016-01-01

    Speaking up, i.e. expressing ones concerns, is a critical piece of effective communication. Yet, we see many situations in which crew members have concerns and still remain silent. Why would that be the case? And how can we assess the risks of speaking up vs. the risks of keeping silent? And once we do make up our minds to speak up, how should we go about it? Our workshop aims to answer these questions, and to provide us all with practical tools for effective risk assessment and effective speaking-up strategies..

  5. ERA-AQUA version 2.0, technical description and manual : a decision support system for the environmental risk assessment of veterinary medicines applied in pond AQUAculture

    NARCIS (Netherlands)

    Rico Artero, A.; Geng, Y.; Focks, A.; Brink, van den P.J.

    2012-01-01

    Veterinary medicinal products are applied in aquaculture production for treating and preventing diseases in the cultured species. Veterinary medicines may enter the environment by effluent discharges, posing a potential risk for surrounding aquatic ecosystems. Furthermore, human health and the trade

  6. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball

    Shutdown critical path: progress and prospects The 2008-09 CMS shutdown is proceeding as intended.  The first two phases, in which the dominant activity (besides heavy logistics) was maintenance and repair of the barrel muon and alignment systems on all wheels and disks (but particularly YB0), have been finished successfully and on time. The yoke wheels at both ends are once again closed over the vactank. Phase 3 is in full swing and has reached maximum complexity, with work-intensity and associated risks similar those encountered in summer 2008. The status going into this CMS week is that the forward pixel tracker at the +z end (FPIX+) has been extracted and transported for maintenance, while the installation of preshower ES+, taking place in parallel, has reached the stage where the active “dee” elements are installed and the drum structures have just been moved back along the beampipe and re-mated to the electromagnetic endcaps. The phase 3 activity requires the large &l...

  7. TECHNICAL COORDINATION

    CERN Multimedia

    Austin Ball

    Introduction Underground installation of the initial CMS detector is almost complete. During this CMS week the detector will reach the minimum necessary condition allowing closure for beam. Configuration for pixel, BCM and endcap ECAL installation will then follow, with the installation of one or both endcap ECAL beingdependent on the actual date when beams may be expected through point 5. As we approach the culmination of 9 years of assembly at Cessy, it is appropriate to pay tribute once again to the continuing dedication and flexibility of all the CERN, collaboration and contractor teams working at point 5, including recently our colleagues from AT/VAC. There is every indication that the legacy of their hard work will be a superb scientific instrument. Safety The final burst of assembly activity in the UXC before closing for beam will involve the familiar worksite risks of heavy manipulation, restricted workspaces, multiple activity and work at height, now amplified by the presence of the very fragile be...

  8. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball and W. Zeuner

    2012-01-01

      In the reporting period, CMS has collected about 10 fb–1 of pp collision data. Considering the prolonged duration of the current running period, with no opportunity for thorough maintenance since 2009, the reliability of the infrastructure and common systems was satisfactory. . Once again, CMS was fortunate that some failures coincided with LHC downtime, avoiding major data losses. After repeated difficulties over the summer with reconnection of the cold box following an unexpected stop, the procedure was revised. For reliability, and to reduce the risk of a fast discharge, the reconnection is now done at a reduced field of 2 T, resulting in a mechanical on-off-on cycle. It is also time consuming, with two times two hours for the ramp-down/up and several hours for refilling the He dewar before restoring the field to 3.8 T. In response to this, a mode of operation has been successfully tested that allows doubling the refill rate of the dewar. Reconnection at a somewhat higher field is ...

  9. Evaluation of an Experimental Re-introduction of Sockeye Salmon into Skaha Lake; 3 of 3; Addendum to the Disease Risk Assessment Section of the 2002 Technical Report, 2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Evelyn, Trevor (Okanagan Nation Alliance, Fisheries Department, Westbank, BC, Canada)

    2004-01-01

    The purpose of this addendum is, first, to provide and discuss disease agent survey results that were not available for inclusion in the Disease Risk Assessment portion of the YEAR 3 report at the time of its writing, and second, to make recommendations stemming from these results. The first set of results deals with live box exposure tests conducted using juvenile sentinel rainbow trout in the spring of 2002 to detect Myxosoma cerebralis and Ceratomyxa shasta. The second set of results deals with similar exposure tests conducted in the spring of 2003. The latter tests were initially intended to occur in the fall of 2002 but had to be re-scheduled to the spring of 2003 because suitably aged sentinel rainbow trout for the exposures were not available in the fall of 2002. The methods used for the live box exposure tests were essentially the same as those described in the YEAR 3 report. Fish were again exposed at the same four sites above McIntyre Dam and at the same four sites below the dam. As mentioned in the YEAR 3 report, the spring 2002 exposure lasted for 21 days (May 6 to 27). The spring 2003 exposure also lasted for 21 days (April 22 to May 13). The number of fish in the spring 2003 tests was, however, reduced to approximately half the number used in previous tests in order to reduce the chances of dissolved oxygen problems, suspected to have occurred in earlier tests in some of the live boxes. As before, fish that survived the live box exposures were transferred to Skaha Hatchery where they were held for sufficient time to permit any infections with M. cerebralis and C. shasta to develop and to permit for spore development in these pathogens. Assays for the pathogens were carried out as previously described. Detection of M. cerebralis was based on detecting its spores following the trypsin/pepsin digestion method. Detection of C. shasta was based on a polymerase chain reaction (PCR) test, but smears of fresh intestinal tissues (one fish per smear) were also

  10. Nuclear safety assessment of nuclear power plants and nuclear risk in Eastern Europe and other regions. Scientific-technical cooperation with nuclear regulatory authorities and technical support organizations (TSOs); Einschaetzung der nuklearen Sicherheit von Kernkraftwerken sowie nuklearer Risiken in Osteuropa und anderen Regionen. Wissenschaftlich-technische Zusammenarbeit mit atomrechtlichen Behoerden und deren Sachverstaendigenorganisationen (TSO)

    Energy Technology Data Exchange (ETDEWEB)

    Wolff, Holger

    2014-09-15

    The BMUB/BfS project 3611I01512 formed the frame of the GRS for the scientifictechnical cooperation with Technical Support Organisations and Nuclear Regulatory Authorities in the field of nuclear safety of NPPs and for the evaluation of nuclear risks in Eastern Europe and other regions for the period from September 2011 till June 2014. In the present final report main results of the project are described. The project comprised the following technical topics: - Record status of NPP modernisation programs, Monitoring and evaluation of modernisation programs; - Design basis and severe accident analyses for NPP with PWR (WWER-440, WWER-1000); - Cooperation with INSC partner countries on DBA, BDBA and severe accident analyses for WWER plants of generation 3+ and on building NRA and safety evaluation capacities; - Decommissioning of nuclear facilities and disposal of radioactive waste; - Evaluation of new reactor concepts and their safety design; Panels at regulatory level. The work results are preceded by a summary on the activities related to the project management and to the planning of the bilateral work.

  11. Fire risk assessment method under the technical building code; Metodo de evaluacion del reisgo de incendio en el marco del Codigo Tecnico de la Edificacion

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Martin, J. C.; Diaz-Diaz, R.; Santos-Garcia, R.

    2010-07-01

    The high complexity of measuring and comparing the risk level of performance based design allowed by the Spain Building Code (CTE) and the lack of Spanish legislation on the matter makes a fire risk evaluation tool highly useful guiding the project's and the control authority over the feasibility of these complicated projects. A fire Risk Evaluation Method within the frame of the Spanish Building Code (MEREDICTE) has been developed trying to balance input sources, simplicity and clearness in its use. The number of parameters implied guarantees sound, exhaustive and reliable outputs. MEREDICTE is made of 73 parameters: 31 calculate potential risk and 42 obtain protection level. In an orientative way, MEREDICTE's parameters triple those of the most referred and extended evaluation method: the Gretener Method. The article shows the MEREDICTE technique and foundations, the methodology used in its investigation and development, its most significant innovation and its possible applications. Regarding the protection level, its formulation and applications re referred to the Windsor buildings of Madrid comparing the results obtained on the building as it was devastated by the fire of February 2005 and whether it fulfilled the Spanish building code conditions. (Author) 8 refs.

  12. Strategy of technical innovation

    International Nuclear Information System (INIS)

    Lee, Ga Jong

    1990-12-01

    This book deals with policy of scientific technique and technical innovation such as research for development and types of technical innovation, historical development and process of technical innovation, economic growth, technology change and investment for research and development, structure and form of technical transfer with the meaning process, from, structure and theory, economic growth and investment of research and development with experiential analysis and case study on strategy of technical innovation in electron and fine chemical industry.

  13. Technical Report - FINAL

    Energy Technology Data Exchange (ETDEWEB)

    Barbara Luke, Director, UNLV Engineering Geophysics Laboratory

    2007-04-25

    Improve understanding of the earthquake hazard in the Las Vegas Valley and to assess the state of preparedness of the area's population and structures for the next big earthquake. 1. Enhance the seismic monitoring network in the Las Vegas Valley 2. Improve understanding of deep basin structure through active-source seismic refraction and reflection testing 3. Improve understanding of dynamic response of shallow sediments through seismic testing and correlations with lithology 4. Develop credible earthquake scenarios by laboratory and field studies, literature review and analyses 5. Refine ground motion expectations around the Las Vegas Valley through simulations 6. Assess current building standards in light of improved understanding of hazards 7. Perform risk assessment for structures and infrastructures, with emphasis on lifelines and critical structures 8. Encourage and facilitate broad and open technical interchange regarding earthquake safety in southern Nevada and efforts to inform citizens of earthquake hazards and mitigation opportunities

  14. Twenty-fifth water reactor safety information meeting: Proceedings. Volume 2: Human reliability analysis and human performance evaluation; Technical issues related to rulemakings; Risk-informed, performance-based initiatives; High burn-up fuel research

    International Nuclear Information System (INIS)

    Monteleone, S.

    1998-03-01

    This three-volume report contains papers presented at the conference. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Japan, Norway, and Russia. The titles of the papers and the names of the authors have been updated and may differ from those that appeared in the final program of the meeting. This volume contains the following: (1) human reliability analysis and human performance evaluation; (2) technical issues related to rulemakings; (3) risk-informed, performance-based initiatives; and (4) high burn-up fuel research

  15. Twenty-fifth water reactor safety information meeting: Proceedings. Volume 2: Human reliability analysis and human performance evaluation; Technical issues related to rulemakings; Risk-informed, performance-based initiatives; High burn-up fuel research

    Energy Technology Data Exchange (ETDEWEB)

    Monteleone, S. [comp.] [Brookhaven National Lab., Upton, NY (United States)

    1998-03-01

    This three-volume report contains papers presented at the conference. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Japan, Norway, and Russia. The titles of the papers and the names of the authors have been updated and may differ from those that appeared in the final program of the meeting. This volume contains the following: (1) human reliability analysis and human performance evaluation; (2) technical issues related to rulemakings; (3) risk-informed, performance-based initiatives; and (4) high burn-up fuel research. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  16. Review of technical justification of assumptions and methods used by the Environmental Protection Agency for estimating risks avoided by implementing MCLs for radionuclides

    International Nuclear Information System (INIS)

    Morris, S.C.; Rowe, M.D.; Holtzman, S.; Meinhold, A.F.

    1992-11-01

    The Environmental Protection Agency (EPA) has proposed regulations for allowable levels of radioactive material in drinking water (40 CFR Part 141, 56 FR 33050, July 18, 1991). This review examined the assumptions and methods used by EPA in calculating risks that would be avoided by implementing the proposed Maximum Contaminant Levels for uranium, radium, and radon. Proposed limits on gross alpha and beta-gamma emitters were not included in this review

  17. Technical basis for the aboveground structure failure and associated represented hazardous conditions

    International Nuclear Information System (INIS)

    GOETZ, T.G.

    2003-01-01

    This technical basis document describes the risk binning process and the technical basis for assigning risk bins for the aboveground structure failure representative accident and associated represented hazardous conditions. This document was developed to support the documented safety analysis

  18. Non-technical skills in the intensive care unit

    NARCIS (Netherlands)

    Reader, T.; Flin, R.; Lauche, K.; Cuthbertson, B.H.

    2006-01-01

    In high-risk industries such as aviation, the skills not related directly to technical expertise, but crucial for maintaining safety (e.g. teamwork), have been categorized as non-technical skills. Recently, research in anaesthesia has identified and developed a taxonomy of the non-technical skills

  19. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    KRIPPS, L.J.

    2005-02-18

    This document describes the qualitative evaluation of frequency and consequences for double shell tank (DST) and single shell tank (SST) representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant SSCs and/or TSRS were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  20. The protection against nuclear risks under the international nuclear liability law: the geographical and technical scope of the international conventions on third party liability for nuclear damage

    International Nuclear Information System (INIS)

    Kissich, S.J.

    2001-10-01

    This Ph.D.-research deals with the International Conventions on Third Party Liability for Nuclear Damage. In 1960, the Paris Convention was established with the aim of providing a special uniform nuclear third party liability regime for Western Europe. This Convention was supplemented in 1963 by the Brussels Supplementary Convention. Also in 1963, the Vienna Convention, which aimed to establish a world-wide system based on the same principles as the Paris Convention, was adopted. A further Convention was adopted in 1971 to ensure that nuclear third party liability law and not maritime law would apply to carriage of nuclear materials by sea. In 1988, the Paris and Vienna Conventions have been linked by the adoption of a Joint Protocol. In 1997, the process of amending the 1963 Vienna Convention was successfully concluded and a Convention on Supplementary Compensation was adopted. This Ph.D.-research consists of seven chapters: following an introduction, the second chapter gives a general view of the existing international legal sources. The third chapter describes the international civil nuclear liability law concept and its leading principles. The main element of this work is the question of the technical and geographical scope of the international nuclear liability conventions (chapter IV and V). The conventions are only applicable to nuclear incidents, which occur in a nuclear installation or incidental to the carriage or storage of nuclear material. The nuclear damage must arise out of the radioactive properties of nuclear substances which are also defined by legal terms. In addition, the scope of the conventions is limited by the nature of the installations. The geographical scope of application is established by the provisions on geographical coverage. Only the 1963 Vienna Convention does not contain any specific provision dealing with the territorial scope of its application. The geographical scope determines where the nuclear incident or the nuclear damage

  1. Technical center for transportation analyses

    International Nuclear Information System (INIS)

    Foley, J.T.

    1978-01-01

    A description is presented of an information search/retrieval/research activity of Sandia Laboratories which provides technical environmental information which may be used in transportation risk analyses, environmental impact statements, development of design and test criteria for packaging of energy materials, and transportation mode research studies. General activities described are: (1) history of center development; (2) environmental information storage/retrieval system; (3) information searches; (4) data needs identification; and (5) field data acquisition system and applications

  2. Technical Assistance Plan (TAP)

    Science.gov (United States)

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  3. Technical report writing

    Science.gov (United States)

    Vidoli, Carol A.

    1992-01-01

    This manual covers the fundamentals of organizing, writing, and reviewing NASA technical reports. It was written to improve the writing skills of LeRC technical authors and the overall quality of their reports.

  4. Technical Report Writing Today

    DEFF Research Database (Denmark)

    Riordan, Daniel G.

    2014-01-01

    Section 1: Technical Communication Basics (8 chapters on tech com, audiences, tech com process, tech com style, researching, designing pages, using visual aids, describing). Section 2: Technical Communication Applications (7 chapters on sets of instructions, informal reports and email, developing...

  5. Technical training: places available

    CERN Document Server

    2013-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch. Eva Stern and Elise Romero, Technical Training Administration (Tel: 74924)

  6. Technical training - places available

    CERN Document Server

    2013-01-01

    If you would like more information on a course, or have any other inquiry/suggestions, please contact Technical.Training@cern.ch. Eva Stern and Elise Romero, Technical Training Administration (Tel: 74924)

  7. Technical training: places available

    CERN Multimedia

    2013-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch. Eva Stern and Elise Romero, Technical Training Administration (Tél : 74924)  

  8. VANDAL technical overview

    International Nuclear Information System (INIS)

    Unsworth, M.D.

    1989-07-01

    This document is concerned with the technicalities of the VANDAL code and covers the technical details of each of the systems modules in turn. Covered are SAMPLING, FLOW, VAULT, GEOSPHERE, BIOSPHERE and TIMESTEPPING. (author)

  9. Technical training: places available

    CERN Multimedia

    2014-01-01

    If you would like more information on a course, or have any other inquiry/suggestions, please contact Technical.Training@cern.ch. Eva Stern and Elise Romero, Technical Training Administration (Tel: 74924)

  10. Technical training: places available

    CERN Multimedia

    2014-01-01

    If you would like more information on a course, or have any other inquiry/suggestions, please contact Technical.Training@cern.ch. Eva Stern and Marie Lahchimi, Technical Training Administration (Tel: 74924)

  11. Research on technical trading and market efficiency : a trader's perspective

    OpenAIRE

    Vico-Ivanina, Julianna V.

    2012-01-01

    Research on the predictive power of technical analysis is a matter of controversy. The objective of this thesis is to look at the empirical research done on technical trading and see how the results can be used from a trader’s perspective. Some results provide strong support for the technical trading and propose useful trading strategies. However, there are some limitations regarding transaction costs, risk adjustment, and statistical tests. Technical research has developed new methodology ap...

  12. Handbook of Technical Communication

    OpenAIRE

    Mehler , Alexander; Romary , Laurent; Gibbon , Dafydd

    2012-01-01

    International audience; The handbook "Technical Communication" brings together a variety of topics which range from the role of technical media in human communication to the linguistic, multimodal enhancement of present-day technologies. It covers the area of computer-mediated text, voice and multimedia communication as well as of technical documentation. In doing so, the handbook takes professional and private communication into account. Special emphasis is put on technical communication bas...

  13. TECHNICAL BASIS DOCUMENT FOR NATURAL EVENT HAZARDS

    International Nuclear Information System (INIS)

    KRIPPS, L.J.

    2006-01-01

    This technical basis document was developed to support the documented safety analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for natural event hazard (NEH)-initiated accidents. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls

  14. Technical basis document for natural event hazards

    International Nuclear Information System (INIS)

    CARSON, D.M.

    2003-01-01

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for natural event hazards (NEH)-initiated representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report

  15. Teaching Technical Writing - Towards Technical Writing

    DEFF Research Database (Denmark)

    Kastberg, Peter

    2000-01-01

    In this paper I will present key aspects of the curriculum for the university degree in technical translation that I have designed for and subsequently implemented at the German Department of the Aarhus School of Business, Denmark. My starting point will be a critical discussion of the norm that ...... of technical writing.......In this paper I will present key aspects of the curriculum for the university degree in technical translation that I have designed for and subsequently implemented at the German Department of the Aarhus School of Business, Denmark. My starting point will be a critical discussion of the norm...... that used to govern what the quality of an LSP text should be as opposed to the standpoint, which I advocate. By way of summing up, I will show how a university curriculum is designed so that - upon graduation - the technical translator could also be methodological quite well suited to take on the challenge...

  16. Technical rules in law

    Energy Technology Data Exchange (ETDEWEB)

    Debelius, J

    1978-08-01

    An important source of knowledge for technical experts is the state of the art reflected by catalogues of technical rules. Technical rules may also achieve importance in law due to a legal transformation standard. Here, rigid and flexible reference are controversial with regard to their admissibility from the point of view of constitutional law. In case of a divergence from the generally accepted technical rules, it is assumed - refutably - that the necessary care had not been taken. Technical rules are one out of several sources of information; they have no normative effect. This may result in a duty of anyone applying them to review the state of technology himself.

  17. Technical rules in law

    International Nuclear Information System (INIS)

    Debelius, J.

    1978-01-01

    An important source of knowledge for technical experts is the state of the art reflected by catalogues of technical rules. Technical rules may also achieve importance in law due to a legal transformation standard. Here, rigid and flexible reference are controversial with regard to their admissibility from the point of view of constitutional law. In case of a divergence from the generally accepted technical rules, it is assumed - refutably - that the necessary care had not been taken. Technical rules are one out of several sources of information; they have no normative effect. This may result in a duty of anyone applying them to review the state of technology himself. (orig.) [de

  18. Science, politics, and health in the brave new world of pharmaceutical carcinogenic risk assessment: technical progress or cycle of regulatory capture?

    Science.gov (United States)

    Abraham, John; Ballinger, Rachel

    2012-10-01

    The carcinogenicity (cancer-inducing potential) of pharmaceuticals is an important risk factor for health when considering whether thousands of patients on drug trials or millions/billions of consumers in the marketplace should be exposed to a new drug. Drawing on fieldwork involving over 50 interviews and documentary research spanning 2002-2010 in Europe and the US, and on regulatory capture theory, this article investigates how the techno-regulatory standards for carcinogenicity testing of pharmaceuticals have altered since 1998. It focuses on the replacement of long-term carcinogenicity tests in rodents (especially mice) with shorter-term tests involving genetically-engineered mice (GEM). Based on evidence regarding financial/organizational control, methodological design, and interpretation of the validation and application of these new GEM tests, it is argued that regulatory agencies permitted the drug industry to shape such validation and application in ways that prioritized commercial interests over the need to protect public health. Boundary-work enabling industry scientists to define some standards of public-health policy facilitated such capture. However, as the scientific credibility of GEM tests as tools to protect public health by screening out carcinogens became inescapably problematic, a regulatory resurgence, impelled by reputational concerns, exercised more control over industry's construction and use of the tests, The extensive problems with GEM tests as public-health protective regulatory science raises the spectre that alterations to pharmaceutical carcinogenicity-testing standards since the 1990s may have been boundary-work in which the political project of decreasing the chance that companies' products are defined as carcinogenic has masqueraded as techno-science. Copyright © 2012. Published by Elsevier Ltd.

  19. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Eggeman, Tim [ZeaChem Inc., Lakewood, CO (United States); O' Neill, Brian [ZeaChem Inc., Lakewood, CO (United States)

    2016-08-17

    ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was already in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive inhibitors

  20. Writing a technical note.

    Science.gov (United States)

    Ng, K H; Peh, W C G

    2010-02-01

    A technical note is a short article giving a brief description of a specific development, technique or procedure, or it may describe a modification of an existing technique, procedure or device applicable to medicine. The technique, procedure or device described should have practical value and should contribute to clinical diagnosis or management. It could also present a software tool, or an experimental or computational method. Technical notes are variously referred to as technical innovations or technical developments. The main criteria for publication will be the novelty of concepts involved, the validity of the technique and its potential for clinical applications.

  1. Technical Elements (CCT1)

    DEFF Research Database (Denmark)

    Thomsen, Kirsten Engelund; Wittchen, Kim Bjarne

    2017-01-01

    Many of the aspects dealt with in the CA EPBD are closely interlinked with each other and may refer to both new and existing buildings, as well as to inspection and certification. This is also true for technical aspects, such as the calculation methodologies, and how to include technical systems......’ efficiency or how to integrate renewable energy within them. The central team for Technical Elements deals with issues of a technical nature, which are common to new and existing buildings, and/or with minimum demands, certification and inspection. This report focuses on the implementation of Articles 3, 4...

  2. Challenges in Risk Assessment: Quantitative Risk Assessment

    OpenAIRE

    Jacxsens, Liesbeth; Uyttendaele, Mieke; De Meulenaer, Bruno

    2016-01-01

    The process of risk analysis consists out of three components, risk assessment, risk management and risk communication. These components are internationally well spread by Codex Alimentarius Commission as being the basis for setting science based standards, criteria on food safety hazards, e.g. setting maximum limits of mycotoxins in foodstuffs. However, the technical component risk assessment is hard to elaborate and to understand. Key in a risk assessment is the translation of biological or...

  3. Flood Risk Regional Flood Defences : Technical report

    NARCIS (Netherlands)

    Kok, M.; Jonkman, S.N.; Lendering, K.T.

    2015-01-01

    Historically the Netherlands have always had to deal with the threat of flooding, both from the rivers and the sea as well as from heavy rainfall. The country consists of a large amount of polders, which are low lying areas of land protected from flooding by embankments. These polders require an

  4. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants (Cooperative Agreement DE-FC03-99SF21902, Am. M004) Final Technical Report

    International Nuclear Information System (INIS)

    Ritterbusch, Stanley E.

    2003-01-01

    accidents would be an inherent part of the Probabilistic Safety Assessment for the plant and their evaluation would be probabilistic. Other first year accomplishments include (1) the conversion of an NRC database for cross-referencing NRC criteria and industry codes and standards to Microsoft 2000 software, (2) an assessment of the NRC's hearing process which concluded that the normal cross-examination during public hearings is not actually required by the U.S. Administrative Procedures Act, (3) the identification and listing of reliability data sources, and (4) interfacing with other industry groups (e.g., NEI and IAEA) and NRC at workshops for risk-informing regulations. The major accomplishments during the second year consisted of (1) issuance of the final report for Subtask 1.1, ''Identify Current Applicable Regulatory Requirements [and Industry Standards],'' (2) issuance of the final report for Subtask 1.2,'' Identify Structures, Systems, and Components and Their Associate d Costs for a Typical Plant,'' (3) extension of the new, highly risk-informed design and regulatory framework to non-light-water-reactor technology, (4) completion of more detailed thermal-hydraulic and probabilistic analyses of advanced conceptual reactor system/component designs, (6) initial evaluation and recommendations for improvement of the NRC design review process, and (7) initial development of the software format, procedures and statistical routines needed to store, analyze and retrieve the available reliability data. Final reports for Subtasks 1.1 (regulatory and design criteria) and 1.2 (costs for structures, systems, and components) were prepared and issued. A final report for Subtask 1.3 (Regulatory Framework) was drafted with the aim to issue it in Phase 3 (Year 3). One technical report was produced for Subtask 1.4 (methods development) and two technical reports were produced for Subtask 1.6 (sample problem analysis). An interim report on the NRC design review process (Subtask 1.7) was

  5. Technical Training for Managers.

    Science.gov (United States)

    Haverland, Edgar M.

    The question has arisen as to what kind of information a manager without extensive technical training needs to learn to supervise effectively. For example, the Nike Hercules fire control platoon leader, usually an officer in his first active duty assignment, seldom has had extensive technical training. Yet he is responsibile for the…

  6. Technical Manual. The ACT®

    Science.gov (United States)

    ACT, Inc., 2014

    2014-01-01

    This manual contains technical information about the ACT® college readiness assessment. The principal purpose of this manual is to document the technical characteristics of the ACT in light of its intended purposes. ACT regularly conducts research as part of the ongoing formative evaluation of its programs. The research is intended to ensure that…

  7. Developing Technical Skill Assessments

    Science.gov (United States)

    Hyslop, Alisha

    2009-01-01

    One of the biggest challenges facing the career and technical education (CTE) community as it works to implement the 2006 Perkins Act is responding to more rigorous requirements for reporting on CTE students' technical skill attainment. The U.S. Department of Education suggested in non-regulatory guidance that states and locals use the number of…

  8. Transformation of technical infrastructure

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev

    1998-01-01

    article about the need of new planning forums in order to initiate transformations with in management of large technical systems for energy, waste and water supply.......article about the need of new planning forums in order to initiate transformations with in management of large technical systems for energy, waste and water supply....

  9. TRANSLATING SERVICE TECHNICAL PROSE

    African Journals Online (AJOL)

    language. The Application of Technical Service. Prose. To form a good idea of the appl ication .... cost lives. In this particular domain, translators must have a sound technical ... These semantic ... another language and often, in doing so, changing its meaning. The words ..... He will hand out tasks to each translator and after.

  10. Technical Writing Tips

    Science.gov (United States)

    Kennedy, Patrick M.

    2004-01-01

    The main reason engineers, technicians, and programmers write poor technical documents is because they have had little training or experience in that area. This article addresses some of the basics that students can use to master technical writing tasks. The article covers the most common problems writers make and offers suggestions for improving…

  11. Research in Technical Colleges

    Science.gov (United States)

    MacLennan, A.

    2008-01-01

    Purpose: The purpose of this paper is to list and demonstrate areas in which research needs to be carried out, or questions answered, in order to raise the quality of technical education. Design/methodology/approach: The area of technical education expanded very rapidly in the late 1950s, and there was little comprehensive knowledge regarding the…

  12. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Glasser, Alan H. [Fusion Theory and Computation Inc., Kingston, WA (United States)

    2018-02-02

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  13. Technical Agency in Practice

    DEFF Research Database (Denmark)

    Krummheuer, Antonia Lina

    2015-01-01

    ) description of hybrid networks in which human and non-human actants are granted agency without differentiating different kinds of agency, EMCA focuses on the member's perspectives and the situated construction of technical agency that is made relevant within an ongoing interaction. Based on an EMCA analysis......The paper combines the discussion of technical agency and hybrid networks of Actor-Network Theory (ANT) with an ethnomethodological/conversation analytical (EMCA) perspective on situated practices in which participants ascribe agency to technical artefacts. While ANT works with (ethnographic...... of three video recordings of situations in which technical agency is made relevant by the human participants, the paper demonstrates different ways in which agency is granted to technical artefacts. Human participants can treat a technology as communication partner, as an active part (and actant...

  14. The French Space Operation Act: Technical Regulations

    Science.gov (United States)

    Trinchero, J. P.; Lazare, B.

    2010-09-01

    The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.

  15. RAMP 2005 technical report

    International Nuclear Information System (INIS)

    2006-01-01

    This technical report provided details of all monitoring activities conducted by the Regional Aquatics Monitoring Program (RAMP), which was initiated in 1997 to examine the impacts of oil sands mining development on aquatic systems in the region. RAMP's objective is to integrate aquatic monitoring activities in order to identify long-term trends and regional issues related to the environment in the Regional Municipality of Wood Buffalo. In 2005, RAMP focused on key components of boreal aquatic ecosystems. This report provided full outlines of all climate and hydrology monitoring activities; water and sedimentation analyses; and studies of benthic communities in rivers, lakes, and deltas. Sets of measurements endpoints were used to represent the health and integrity of valued environmental resources. Satellite imager was used to estimate activities related to oil sands developments. The report was divided into subsections which related monitoring activities for various rivers and tributaries in the region. Small and negligible calculated changes were observed in hydrologic conditions in the Athabasca River mainstem. No discernible changes in water and sediment quality were observed that could positively be ascribed to oil sands developments in the region. Very little evidence suggested that fish populations had changed as a result of increased activities in the region. The influence of oil sands development activities on the aquatic resources of the Athabasca River mainstem were minor and mostly undetectable. The results of fish tissue studies from the lower Athabasca River showed that concentrations of mercury in fish tissues occurred at levels that posed a high risk to subsistence fishers. A higher number of metal concentrations in some lakes in the region was attributed to natural causes. The results of a sentinel species monitoring program conducted at the Ells River watershed were also included. Recommendations for further refining RAMP programs were also

  16. Does radiation risk exist?

    International Nuclear Information System (INIS)

    Passchier, W.

    1996-01-01

    Risk assessment and risk management are parts of a dynamic process with the objective to decide on the tolerability of risk and on measures to keep risk within accepted limits. It enables all relevant parties to express their concerns and preferences regarding the different options for the human action involved and regarding the relative importance of criteria to decide on the tolerability of risk. Risk assessment has three phases; problem definition, risk analysis and risk characterization. Risk analysis is primarily a technical and scientific endeavour. With regard to problem definition and ride characterization consultation between risk assessors and risk managers (and other parties concerned) is a must. (author)

  17. Towards common technical standards

    International Nuclear Information System (INIS)

    Rahmat, H.; Suardi, A.R.

    1993-01-01

    In 1989, PETRONAS launched its Total Quality Management (TQM) program. In the same year the decision was taken by the PETRONAS Management to introduce common technical standards group wide. These standards apply to the design, construction, operation and maintenance of all PETRONAS installations in the upstream, downstream and petrochemical sectors. The introduction of common company standards is seen as part of an overall technical management system, which is an integral part of Total Quality Management. The Engineering and Safety Unit in the PETRONAS Central Office in Kuala Lumpur has been charged with the task of putting in place a set of technical standards throughout PETRONAS and its operating units

  18. Persistent profitability of technical analysis on foreign exchange markets?

    OpenAIRE

    L. MENKHOFF; M. SCHLUMBERGER

    1995-01-01

    The effect of technical analyses on the performance of subsequent policies and actions in the foreign exchange markets is analysed using three cases. Results show that use of technical analyses is persistently profitable. Participants, however, tend to view short-term market risk as important and thus decide to forego some of the rules derived from technical analysis. This observation does not negate the theory on efficient learning.

  19. Technical standards in nuclear area

    International Nuclear Information System (INIS)

    Grimberg, M.

    1978-01-01

    The technical standardization in nuclear area is discussed. Also, the competence of CNEN in standardization pursuit is analysed. Moreover, the process of working up of technical standards is explained; in addition, some kinds of technical standards are discussed. (author) [pt

  20. SAM Technical Contacts

    Science.gov (United States)

    These technical contacts are available to help with questions regarding method deviations, modifications, sample problems or interferences, quality control requirements, the use of alternative methods, or the need to address analytes or sample types.

  1. INDOT Technical Training Plan

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...

  2. social & technical innovations

    International Development Research Centre (IDRC) Digital Library (Canada)

    CHANGE: GAPS BRIDGED BY SMART SOLUTIONS. CHALLENGE: INABILITY TO REACH THOSE IN NEED. SOLAR PANELS. OVERCOME POWER. SUPPLY CHALLENGES. IN BURKINA FASO. SOCIAL & TECHNICAL. INNOVATIONS. BANGLADESH BURKINA FASO ETHIOPIA KENYA LEBANON PERU VIETNAM.

  3. Superfund Technical Assistance Grants

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes data related to the Superfund Technical Assistance Grant program, including grant number, award amounts, award dates, period of performance,...

  4. OSH technical reference manual

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinent to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.

  5. NCDC Technical Reports

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCDC Technical Reports is a set of retrospective analyses produced by the Research Customer Service Group and the National Climatic Data Center from 1995 to 2008....

  6. Socio-technical Betwixtness

    DEFF Research Database (Denmark)

    Bossen, Claus

    2017-01-01

    the intrinsically social and technical interwovenness of design, and the necessity of including affected people and stakeholders in the design process. This betwixtness of socio-technical design is demonstrated by the analysis of two IT systems for healthcare: a foundational model for electronic healthcare records......This chapter focusses on two challenges for socio-technical design: Having to choose between different rationales for design, and the adequate understanding and depiction of the work to be redesigned. These two challenges betwixt the otherwise strong tenets of socio-technical design of pointing out......, and an IT system organizing hospital porters’ work. The conceptual background for the analysis of the cases is provided by a short introduction to different rationales for organizational design, and by pointing to the differences between a linear, rationalistic versus an interactional depiction of work....

  7. Technical report writing today

    CERN Document Server

    Riordan, Daniel G

    2014-01-01

    "Technical Report Writing Today" provides thorough coverage of technical writing basics, techniques, and applications. Through a practical focus with varied examples and exercises, students internalize the skills necessary to produce clear and effective documents and reports. Project worksheets help students organize their thoughts and prepare for assignments, and focus boxes highlight key information and recent developments in technical communication. Extensive individual and collaborative exercises expose students to different kinds of technical writing problems and solutions. Annotated student examples - more than 100 in all - illustrate different writing styles and approaches to problems. Numerous short and long examples throughout the text demonstrate solutions for handling writing assignments in current career situations. The four-color artwork in the chapter on creating visuals keeps pace with contemporary workplace capabilities. The Tenth Edition offers the latest information on using electronic resum...

  8. The technical supervision interface

    CERN Document Server

    Sollander, P

    1998-01-01

    The Technical Control Room (TCR) is currently using 30 different applications for the remote supervision of the technical infrastructure at CERN. These applications have all been developed with the CERN made Uniform Man Machine Interface (UMMI) tools built in 1990. However, the visualization technology has evolved phenomenally since 1990, the Technical Data Server (TDS) has radically changed our control system architecture, and the standardization and the maintenance of the UMMI applications have become important issues as their number increases. The Technical Supervision Interface is intended to replace the UMMI and solve the above problems. Using a standard WWW-browser for the display, it will be inherently multi-platform and hence available for control room operators, equipment specialists and on-call personnel.

  9. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Aristos Aristidou Natureworks); Robert Kean (NatureWorks); Tom Schechinger (IronHorse Farms, Mat); Stuart Birrell (Iowa State); Jill Euken (Wallace Foundation & Iowa State)

    2007-10-01

    The two main objectives of this project were: 1) to develop and test technologies to harvest, transport, store, and separate corn stover to supply a clean raw material to the bioproducts industry, and 2) engineer fermentation systems to meet performance targets for lactic acid and ethanol manufacturers. Significant progress was made in testing methods to harvest corn stover in a “single pass” harvest mode (collect corn grain and stover at the same time). This is technically feasible on small scale, but additional equipment refinements will be needed to facilitate cost effective harvest on a larger scale. Transportation models were developed, which indicate that at a corn stover yield of 2.8 tons/acre and purchase price of $35/ton stover, it would be unprofitable to transport stover more than about 25 miles; thus suggesting the development of many regional collection centers. Therefore, collection centers should be located within about 30 miles of the farm, to keep transportation costs to an acceptable level. These collection centers could then potentially do some preprocessing (to fractionate or increase bulk density) and/or ship the biomass by rail or barge to the final customers. Wet storage of stover via ensilage was tested, but no clear economic advantages were evident. Wet storage eliminates fire risk, but increases the complexity of component separation and may result in a small loss of carbohydrate content (fermentation potential). A study of possible supplier-producer relationships, concluded that a “quasi-vertical” integration model would be best suited for new bioproducts industries based on stover. In this model, the relationship would involve a multiyear supply contract (processor with purchase guarantees, producer group with supply guarantees). Price will likely be fixed or calculated based on some formula (possibly a cost plus). Initial quality requirements will be specified (but subject to refinement).Producers would invest in harvest

  10. Factors that Influence Women's Technical Skill Development in Outdoor Adventure

    Science.gov (United States)

    Warren, Karen; Loeffler, TA

    2006-01-01

    This article provides a theoretical foundation for understanding women's technical skill development (TSD) in outdoor adventure. An examination of societal and biological factors influencing women's TSD focuses on gender role socialization, sense of competence, technical conditioning, sexism, spatial ability, and risk-taking. The article suggests…

  11. Training for Technical Assistants: Technical Assistance Program

    Science.gov (United States)

    1986-09-01

    shortage of technical ptfesson until such time as English , "speking instructors might be trained, There. would be An aumcation of committed on-calI...12 hours in classroom Instruction, students in English as a Second nel Research and Development Computer.taught students Language. The program Is...hbeels "p.-ogram. A Iot ’ atar boiler arn tank heats týe food enroute to its destination. 1.0. A new tor of dust ptectleon to protect machine .perators

  12. An Effective Health and Medical Technical Authority

    Science.gov (United States)

    Fogarty, Jennifer A.

    2009-01-01

    The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that

  13. 78 FR 27963 - Reliability Technical Conference; Notice of Technical Conference

    Science.gov (United States)

    2013-05-13

    ... Technical Conference; Notice of Technical Conference Take notice that the Federal Energy Regulatory Commission will hold a Technical Conference on Tuesday, July 9, 2013 from 9:00 a.m. to 5:00 p.m. This... technical support for webcasts and offers the option of listening to the meeting via phone-bridge for a fee...

  14. 76 FR 64083 - Reliability Technical Conference; Notice of Technical Conference

    Science.gov (United States)

    2011-10-17

    ... Technical Conference; Notice of Technical Conference Take notice that the Federal Energy Regulatory Commission will hold a Technical Conference on Tuesday, November 29, 2011, from 1 p.m. to 5 p.m. and... reliability that were identified in earlier Commission technical conferences. The conference also will discuss...

  15. Industrial risks

    International Nuclear Information System (INIS)

    Okrent, D.

    1981-01-01

    A brief look is taken at the status of progress, or the lack of it, towards a quantitative approach to the estimation and assessment of risk for several technologies in the United States. The increase of interest in the consideration of comparative risks in decision-making is also discussed. Finally, a recently proposed trial approach to quantitative safety goals for light-water nuclear power reactors is summarized. The approach is divided into two major tasks: the predominantly social and political task of setting safety criteria, and the technical task of estimating the risks and deciding whether the safety criteria have been met. The safety criteria include the following: limits on hazard states within the reactor; limits on risk to the individual; limits on societal risk; a cost-effectiveness criterion as low as reasonably achievable; a small element of risk aversion. (author)

  16. Technical training: places available

    CERN Document Server

    2013-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch Valeria Perez Reale, Learning Specialist, Technical Programme Coordinator (Tel.: 62424) Eva Stern and Elise Romero, Technical Training Administration (Tel.: 74924)   Electronics design Next Session Duration Language Introduction to VHDL 21-Feb-13 to 22-Feb-13 2 days English Mechanical design Next Session Duration Language ANSYS - Introduction à ANSYS Mechanical APDL 04-Feb-13 to 07-Feb-13 4 days English Applications de la cotation fonctionnelle et du langage ISO 06-Feb-13 to 08-Feb-13 2 days 4 hours French CATIA V5 – Surfacique 14-Jan-13 to 15-Jan-13 2 days French Office software Next Session Duration Language ACCESS 2010 - niveau 2 : ECDL 06-Feb-13 to 07-Feb-13 2 days French Dreamweaver CS3 - Niveau 1 14-Jan-13 to 15-Jan-13 2 d...

  17. Technical training - Places available

    CERN Document Server

    2012-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch Valeria Perez Reale, Learning Specialist, Technical Programme Coordinator (Tel.: 62424) Eva Stern and Elise Romero, Technical Training Administration (Tel.: 74924)   Electronics design Next Session Duration Language Availability Certified LabVIEW Associate Developer (CLAD) 06-Dec-12 to 06-Dec-12 1 hour English One more place available Compatibilité électromagnetique (CEM): Applications 23-Nov-12 to 23-Nov-12 3.5 hours English 3 places available Compatibilité électromagnétique (CEM): Introduction 23-Nov-12 to 23-Nov-12 3 hours English 43 places available Effets des Radiations sur les composants et systèmes électroniques 11-Dec-12 to 12-Dec-12 1 day 4 hours French 9 places available LabVIEW for beginners ...

  18. Technical training - places available

    CERN Multimedia

    2012-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch Valeria Perez Reale, Learning Specialist, Technical Programme Coordinator (Tel.: 62424) Eva Stern and Elise Romero, Technical Training Administration (Tel.: 74924) HR Department »Electronics design Next Session Duration Language Availability Comprehensive VHDL for FPGA Design 08-Oct-12 to 12-Oct-12 5 days English 3 places available Foundations of Electromagnetism and Magnet Design (EMAG) 14-Nov-12 to 27-Nov-12 6 days English 20 places available Impacts de la suppression du plomb (RoHS) en électronique 26-Oct-12 to 26-Oct-12 8 hours French 15 places available Introduction to VHDL 10-Oct-12 to 11-Oct-12 2 days English 7 places available LabVIEW Real Time and FPGA 13-Nov-12 to 16-Nov-12 5 days French 5 places available »Mechanical design Next Se...

  19. Problems of technical cooperation

    International Nuclear Information System (INIS)

    Noramli, M.

    1987-01-01

    The main principles of the IAEA technical co-operation program, which intends to answer the requirements of the member states as regards technical assistance, are presented. IAEA offers its assistance in the supervision and financial support of the projects, which promise direct and quick profit to the member states. Projects related to the satisfaction of the main demands of humanity, industrial use, energy generation, radiation protection and other fields, which can promote the contribution of nuclear power generation to the course of peace, protection of health and thriving of states, are among them. 35 million dollars (USA) was allocated for the IAEA technical assistance and realization of the co-operation program in 1987

  20. Fuel Element Technical Manual

    Energy Technology Data Exchange (ETDEWEB)

    Burley, H.H. [ed.

    1956-08-01

    It is the purpose of the Fuel Element Technical Manual to Provide a single document describing the fabrication processes used in the manufacture of the fuel element as well as the technical bases for these processes. The manual will be instrumental in the indoctrination of personnel new to the field and will provide a single data reference for all personnel involved in the design or manufacture of the fuel element. The material contained in this manual was assembled by members of the Engineering Department and the Manufacturing Department at the Hanford Atomic Products Operation between the dates October, 1955 and June, 1956. Arrangement of the manual. The manual is divided into six parts: Part I--introduction; Part II--technical bases; Part III--process; Part IV--plant and equipment; Part V--process control and improvement; and VI--safety.

  1. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2009-01-01

    Are you running Vista on your new PC – or are you planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual session of this course will take place on 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  2. Transformation of technical infrastructure

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev

    , the evolution of large technological systems and theories about organisational and technological transformationprocesses. The empirical work consist of three analysis at three different levels: socio-technical descriptions of each sector, an envestigation of one municipality and envestigations of one workshop......The scope of the project is to investigate the possibillities of - and the barriers for a transformation of technical infrastructure conserning energy, water and waste. It focus on urban ecology as a transformation strategy. The theoretical background of the project is theories about infrastructure...

  3. KSC Technical Capabilities Website

    Science.gov (United States)

    Nufer, Brian; Bursian, Henry; Brown, Laurette L.

    2010-01-01

    This document is the website pages that review the technical capabilities that the Kennedy Space Center (KSC) has for partnership opportunities. The purpose of this information is to make prospective customers aware of the capabilities and provide an opportunity to form relationships with the experts at KSC. The technical capabilities fall into these areas: (1) Ground Operations and Processing Services, (2) Design and Analysis Solutions, (3) Command and Control Systems / Services, (4) Materials and Processes, (5) Research and Technology Development and (6) Laboratories, Shops and Test Facilities.

  4. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    Are you running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at Technical.Training@cern.ch

  5. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    You are running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  6. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    Are you running Vista on your new PC – or are you planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  7. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    You are running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced using Windows XP. The next bilingual sessions of this course will take place on December 12, 2008 and January 30, 2009. Register using our catalogue : http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at Technical.Training@cern.ch

  8. Technical memory 2007

    International Nuclear Information System (INIS)

    2009-01-01

    The technical memory 2007 of the Nuclear Regulatory Authority (ARN) of the Argentine Republic, compiles the papers published in the subject on radiation protection and nuclear safety, and presented in journals, technical reports, congress or meetings of these specialities by personnel of the mentioned institution during 2007. In this edition the documents are presented on: environmental protection; transport of radioactive materials; regulations; research reactors and nuclear power plants; biological radiation effects; therapeutic uses of ionizing radiation and radioprotection of patients; internal dosimetry; physical dosimetry; knowledge management; radioactive waste management [es

  9. Technical approach to groundwater restoration

    International Nuclear Information System (INIS)

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  10. Opening remarks: regulatory initiatives toward improved technical specifications

    International Nuclear Information System (INIS)

    Edison, G.E.

    1985-01-01

    In order to deal with the numerous problems that have evolved over the years with nuclear power plant technical specifications, the Nuclear Regulatory Commission has undertaken some initiatives for improvement: 1) new operating licenses, 2) change to existing operating reactor technical specifications, 3) a broad-scoped reconsideration of the content of technical specifications, and 4) rule changes. It is believed that reliability and risk assessment techniques can be used in conjunction with manufacturer's recommendations and engineering judgment to better define the appropriate scope and depth for technical specification resulting in focusing attention on high risk-worth systems and avoidance of plant shutdown transients both intentionally and unintentionally through provisions of technical specifications

  11. Technical Knowledge Creation: Enabling Tacit Knowledge Use

    DEFF Research Database (Denmark)

    Søberg, Peder Veng; Chaudhuri, Atanu

    2018-01-01

    The paper investigates knowledge creation in nascent technical industries, a somewhat neglected empirical setting concerning knowledge creation. Frameworks on organizational learning and knowledge creation assume that knowledge creation depends on language creation and neglect the benefits involved...... by allowing elements of new product and process ideas to mature in a tacit form, whereas cognitive neuroscience data suggests that technical knowledge creation is largely nonlinguistic. The four case studies point to excessive reliance on group discussion, a need for more trial and error and that field tests...... and prototypes generate new learnings that save time and lowers subsequent risks. Technical knowledge creation in nascent high tech industries requires opportunities to work with and further develop knowledge in its tacit form. The paper refines frameworks on organizational learning and knowledge creation...

  12. The International Technical Safety Forum

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    The International Technical Safety Forum is a meeting of safety experts from several physics labs in Europe and the US. Since 1998 participants have been meeting every couple of years to discuss common challenges in safety matters. The Forum helps them define best practices and learn from the important lessons learned by others.   The Forum's participants in front of building 40. This year, the meeting took place at CERN from 12 to 16 April. “This year's meeting covered subjects ranging from communication and training in matters of safety, to cryogenic safety, emergency preparedness and risk analysis”, explains Ralf Trant, head of the CERN Safety Commission and organiser of this year’s Forum. Radiation protection issues are not discussed at the meeting since they involve different expertise. The goal of the Forum is to allow participants to share experience, learn lessons and acquire specific knowledge in a very open way. Round-table discussions, dedicated time for ...

  13. Routledge French technical dictionary

    CERN Document Server

    1994-01-01

    The French-English volume of this highly acclaimed set consists of some 100,000 keywords in both French and English, drawn from the whole range of modern applied science and technical terminology. Covers over 70 subject areas, from engineering and chemistry to packaging, transportation, data processing and much more.

  14. Technical objectives of inspection

    International Nuclear Information System (INIS)

    Sorenson, R.J.; Stewart, K.B.; Schneider, R.A.

    1976-01-01

    The various technical objectives of inspection are discussed in a very general manner. The discussion includes how the inspection function is related to the assumed threat, the various degrees of assurance and reliance on criteria, and the hierarchy of assurance which is obtained from the various types or levels of inspection

  15. NUSC Technical Publications Guide.

    Science.gov (United States)

    1985-05-01

    Facility personnel especially that of A. Castelluzzo, E. Deland, J. Gesel , and E. Szlosek (all of Code 4343). Reviewed and Approved: 14 July 1980 D...their technical content and format. Review and approve the manual outline, the review manuscript, and the final camera - reproducible copy. Conduct in

  16. ITER EDA technical activities

    International Nuclear Information System (INIS)

    Aymar, R.

    1998-01-01

    Six years of technical work under the ITER EDA Agreement have resulted in a design which constitutes a complete description of the ITER device and of its auxiliary systems and facilities. The ITER Council commented that the Final Design Report provides the first comprehensive design of a fusion reactor based on well established physics and technology

  17. Technical basis of safeguards

    International Nuclear Information System (INIS)

    Buechler, C.

    1975-01-01

    Definition of nuclear materials control. Materials accountancy and physical control as technical possibilities. Legal possibilities and levels of responsibility: material holders, national and international authority. Detection vs. prevention. Physical security and containment surveillance. Accountancy: materials balance concept. Materials measurement: inventory taking, flow determination. IAEA safeguards; verification of operator's statement. (HP) [de

  18. Technical memory 1999

    International Nuclear Information System (INIS)

    2000-01-01

    The technical memory 1999 of the Nuclear Regulatory Authority (NRA) of the Argentine Republic, compile the papers published in the subject on radiation protection and nuclear safety, safeguards and physical protection, and presented in congress or meetings of these specialities by personnel of the mentioned institution during 1999

  19. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: LabVIEW Real-Time (F) : 7 - 9.6.2005 (3 jours) LabVIEW Migration 6 to 7: 14.6.2005 (1 day) IT3T/1 - Read your mail and more with Outlook 2003 : 14.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/2 - Creating, managing and using distribution lists with Simba2 : 16.6.2005 (IT Technical Training Tutorial, free of charge) FrontPage 2003 - niveau 2 : 16 & 17.6.2005 (2 jours) Utilisation de fichiers PDF avec ACROBAT 6.0 : 20.6.2005 (1journée) Introduction to ANSYS: 21 - 24.6.2005 (4 days) IT3T/3 - Working remotely with Windows XP : 28.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/4 - Editing Websites with Frontpage 2003 : 30.6.2005 (IT Technical Training Tutorial, free of charge) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoC...

  20. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    John Ross

    2003-04-30

    The Final Technical Report summarizes research accomplishments and Publications in the period of 5/1/99 to 4/30/03 done on the grant. Extensive progress was made in the period covered by this report in the areas of chemical kinetics of non-linear systems; spatial structures, reaction - diffusion systems, and thermodynamic and stochastic theory of electrochemical and general systems.

  1. Materials Technical Team Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-08-01

    Roadmap identifying the efforts of the Materials Technical Team (MTT) to focus primarily on reducing the mass of structural systems such as the body and chassis in light-duty vehicles (including passenger cars and light trucks) which enables improved vehicle efficiency regardless of the vehicle size or propulsion system employed.

  2. Technical Writing in Hydrogeology.

    Science.gov (United States)

    Tinker, John R., Jr.

    1986-01-01

    A project for Writing Across the Curriculum at the University of Wisconsin-Eau Claire is described as a method to relate the process of writing to the process of learning hydrology. The project focuses on an actual groundwater contamination case and is designed to improve the technical writing skills of students. (JN)

  3. Review of technical specifications

    International Nuclear Information System (INIS)

    Bedrich, M.; Scholz, D.

    1980-01-01

    The present paper deals with position and function of technical specifications before and during the manufacturing of reactor components, their structure and reasons for specific regulations due to safety philosophy and explains the cooperation of supplier, manufacturer, utilities and supervisory organizations. (RW)

  4. PISA 2009 Technical Report

    Science.gov (United States)

    OECD Publishing (NJ1), 2012

    2012-01-01

    The "PISA 2009 Technical Report" describes the methodology underlying the PISA 2009 survey. It examines additional features related to the implementation of the project at a level of detail that allows researchers to understand and replicate its analyses. The reader will find a wealth of information on the test and sample design,…

  5. PISA 2012 Technical Report

    Science.gov (United States)

    OECD Publishing, 2014

    2014-01-01

    The "PISA 2012 Technical Report" describes the methodology underlying the PISA 2012 survey, which tested 15-year-olds' competencies in mathematics, reading and science and, in some countries, problem solving and financial literacy. It examines the design and implementation of the project at a level of detail that allows researchers to…

  6. New usable technical specifications

    International Nuclear Information System (INIS)

    Webster, S.A.; Tomasi, L.T.; Bernier, R.A.

    1989-01-01

    After 2 yr of preparation, 1988 finally saw the nuclear industry writing operator-oriented technical specifications. This effort is a continuation of previous efforts to develop improved and usable standard technical specifications (STSs), and is being conducted by the four nuclear steam supply system vendor owners' groups under the auspices of the Nuclear Management Resources Council. Each participant is currently preparing a set of improved STSs based on a writer's guide that was developed through a combined industry effort. In May of 1987, a Human Factors Improvements to Technical Specifications (HFITS) task group was formed to prepare a writer's guide for improved, industrywide STSs. This task group was composed of two representatives from each owners' group, one with a human factors background and one with some operations background. Two documents were prepared in 6 months, a human factors report laying the groundwork for the considerations to go into technical specifications and a writer's guide for their preparation. This paper reports on the application of this writer's guide to the writing of improved STS

  7. Engineering Technical Support Center Annual Report Fiscal ...

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  8. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Howe, Gary [RTI International, Research Triangle Park, NC (United States); Albritton, John [RTI International, Research Triangle Park, NC (United States); Denton, David [RTI International, Research Triangle Park, NC (United States); Turk, Brian [RTI International, Research Triangle Park, NC (United States); Gupta, Raghubir [RTI International, Research Triangle Park, NC (United States)

    2018-01-31

    technology has great potential to provide clean syngas from coal and petcoke-based gasification at increased efficiency and at significantly lower capital and operating costs than conventional syngas cleanup technologies. However, before the technology can be deemed ready for scale-up to a full commercial-scale demonstration, additional R&D testing is needed at the site to address the following critical technical risks: WDP sorbent stability and performance; Impact of WDP on downstream cleanup and conversion steps; Metallurgy and refractory; Syngas cleanup performance and controllability; Carbon capture performance and additional syngas cleanup The proposed plan to acquire this additional R&D data involves: Operation of the units to achieve an additional 3,000 hours of operation of the system within the performance period, with a target of achieving 1,000 hours of those hours via continuous operation of the entire integrated pre-commercial demonstration system; Rapid turnaround of repairs and/or modifications required as necessary to return any specific unit to operating status with documentation and lessons learned to support technology maturation, and; Proactive performance of maintenance activities during any unplanned outages and if possible while operating.

  9. Probabilistic risk assessment as an aid to risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1982-01-01

    Probabilistic risk assessments are providing important insights into nuclear power plant safety. Their value is two-fold: first as a means of quantifying nuclear plant risk including contributors to risk, and second as an aid to risk management. A risk assessment provides an analytical plant model that can be the basis for performing meaningful decision analyses for controlling safety. It is the aspect of quantitative risk management that makes probabilistic risk assessment an important technical discipline of the future

  10. Bioethics for Technical Experts

    Science.gov (United States)

    Asano, Shigetaka

    Along with rapidly expanding applications of life science and technology, technical experts have been implicated more and more often with ethical, social, and legal problems than before. It should be noted that in this background there are scientific and social uncertainty elements which are inevitable during the progress of life science in addition to the historically-established social unreliability to scientists and engineers. In order to solve these problems, therefore, we should establish the social governance with ‘relief’ and ‘reliance’ which enables for both citizens and engineers to share the awareness of the issues, to design social orders and criterions based on hypothetical sense of values for bioethics, to carry out practical use management of each subject carefully, and to improve the sense of values from hypothetical to universal. Concerning these measures, the technical experts can learn many things from the present performance in the medical field.

  11. Sources of technical assistance

    International Nuclear Information System (INIS)

    Laue, H.J.

    1977-01-01

    This paper shows examples of technical assistance programmes within bilateral cooperation agreements between the Federal Republic of Germany and a number of developing countries of very different characteristics and summarizes the possibilities of technical assistance granted by international organizations, such as IAEA, UNDP, etc. A basic requirement for a successful transfer of technology is a high knowledge level of the indigenous scientists and engineers. Therefore, programmes for training and education and for information exchange are presented. Based on these, the means and methods of planning, performance and quality assurance are explained by practical examples and are related to the progress achieved in the use of nuclear energy and in establishing a national industry in the developing countries. (orig.) [de

  12. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The Joint PVSS JCOP Framework: 14 - 18.6.2004 (5 days) EXCEL 2003 - niveau 2 : 17 & 18.6.2004 (2 jours) MAGNE-04 : Magnétisme pour l'électrotechnique : 6 au 8.7.2004 (3 jours) Technical Training Monique Duval - Tel.74924 technical.training@cern.ch

  13. Understanding Socio Technical Modularity

    DEFF Research Database (Denmark)

    Thuesen, Christian Langhoff; Kudsk, Anders; Hvam, Lars

    2011-01-01

    Modularity has gained an increasing popularity as a central concept for exploring product structure, process structure, organization structure and supply chain structure. With the offset in system theory the predominant understanding of modularity however faces difficulties in explaining the social...... dimension of modularity like irrational behaviors, cultural differences, learning processes, social organization and institutional influences on modularity. The paper addresses this gab offering a reinterpretation of the modularity concept from a socio-technical perspective in general and Actor Network...... Theory in particular. By formulating modularity from an ANT perspective covering social, material and process aspects, the modularity of a socio-technical system can be understood as an entanglement of product, process, organizational and institutional modularity. The theoretical framework is illustrated...

  14. Independent technical review, handbook

    International Nuclear Information System (INIS)

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project

  15. Independent technical review, handbook

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  16. Technical approach document

    International Nuclear Information System (INIS)

    1989-12-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law 95-604 (PL95-604), grants the Secretary of Energy the authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards caused by inactive uranium mill sites. This Technical Approach Document (TAD) describes the general technical approaches and design criteria adopted by the US Department of Energy (DOE) in order to implement remedial action plans (RAPS) and final designs that comply with EPA standards. It does not address the technical approaches necessary for aquifer restoration at processing sites; a guidance document, currently in preparation, will describe aquifer restoration concerns and technical protocols. This document is a second revision to the original document issued in May 1986; the revision has been made in response to changes to the groundwater standards of 40 CFR 192, Subparts A--C, proposed by EPA as draft standards. New sections were added to define the design approaches and designs necessary to comply with the groundwater standards. These new sections are in addition to changes made throughout the document to reflect current procedures, especially in cover design, water resources protection, and alternate site selection; only minor revisions were made to some of the sections. Sections 3.0 is a new section defining the approach taken in the design of disposal cells; Section 4.0 has been revised to include design of vegetated covers; Section 8.0 discusses design approaches necessary for compliance with the groundwater standards; and Section 9.0 is a new section dealing with nonradiological hazardous constituents. 203 refs., 18 figs., 26 tabs

  17. Technical Leadership Development Program

    Science.gov (United States)

    2010-12-13

    the traditional tenets of leadership and management , systems thinking, understanding SOS issues, and thinking and acting holistically. Our research...international element 2.0 Enterprise Leadership and Management UNCLASSIFIED Contract Number: H98230-08-D-0171 DO 002. TO002, RT 004 Report No...mechanisms for leadership of the overall technical effort, for systems engineering, for requirements, management , and for systems integration. o Develop

  18. Technical issues for WIPP

    International Nuclear Information System (INIS)

    Hunter, T.O.

    1979-01-01

    Emplacement of wastes in the WIPP will include experiments on various waste types which will provide essential data on waste-rock interaction and repository response. These experiments will include evolution of the synergistic effects of both heat production, radiation, and actual waste forms. While these studies will provide essential data on the validity of waste isolation in bedded salt, they will be preceded by a broad-based experimental program which will resolve many of the current technical issues providing not only an assessment of the safety of performing such experiments but also the technical basis for assurance that the appropriate experiments are performed. Data and predictive modeling techniques, which are currently available, can bound the consequences associated with these technical issues. Predictions of the impact on public safety based on these analyses indicate that safe waste disposal in WIPP salt beds is achievable; however, a major use of WIPP will be to conduct realistic experiments with HLW forms to address some of the unresolved details of these waste/salt interactions

  19. Technical training - Places available

    CERN Multimedia

    2012-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch Valeria Perez Reale, Learning Specialist, Technical Programme Coordinator (Tel.: 62424) Eva Stern and Elise Romero, Technical Training Administration (Tel.: 74924) HR Department Electronic Design Next Session Duration Language Availability Comprehensive VHDL for FPGA Design 08-Oct-12 to 12-Oct-12 5 days English 4 places Electrostatique / Protection ESD 28-Sep-12 to 28-Sep-12 3 hours French 25 places Impacts de la suppression du plomb (RoHS) en électronique 26-Oct-12 to 26-Oct-12 8 hours French 14 places Introduction to VHDL 10-Oct-12 to 11-Oct-12 2 days English 9 places LabVIEW Real Time and FPGA 13-Nov-12 to 16-Nov-12 5 days French 5 places LabVIEW for Experts 24-Sep-12 to 28-Sep-12 5 days English 6 places LabVIEW for beginners 15-Oct-12 to 17-...

  20. Technical Assistance Needs Assessments (TANAs)

    Science.gov (United States)

    The Technical Assistance Needs Assessment (TANA) is a process to identify whether a community requires additional support from EPA in order to understand technical information and have meaningful participation in the Superfund decision-making process.

  1. El Salvador - Formal Technical Education

    Data.gov (United States)

    Millennium Challenge Corporation — With a budget of nearly $20 million, the Formal Technical Education Sub-Activity was designed to strengthen technical and vocational educational institutions in the...

  2. Radon Protection in the Technical Building Code

    International Nuclear Information System (INIS)

    Frutos, B.; Garcia, J. P.; Martin, J. L.; Olaya, M.; Serrano, J I.; Suarez, E.; Fernandez, J. A.; Rodrigo, F.

    2003-01-01

    Building construction in areas with high radon gas contamination in land requires the incorporation of certain measures in order to prevent the accumulation of this gas on the inside of buildings. These measures should be considered primarily in the design and construction phases and should take the area of the country into consideration where the construction will take place depending on the potential risk of radon entrance. Within the Technical Building Code, radon protection has been considered through general classification of the country and specific areas where building construction is to take place, in different risk categories and in the introduction of building techniques appropriate for each area. (Author) 17 refs

  3. Technical Specification action statements requiring shutdown

    International Nuclear Information System (INIS)

    Mankamo, T.; Kim, I.S.; Samanta, P.K.

    1993-11-01

    When safety systems fail during power operation, the limiting conditions for operation (LCOs) and associated action statements of technical specifications typically require that the plant be shut down within the limits of allowed outage time (AOT). However, when a system needed to remove decay heat, such as the residual heat removal (RHR) system, is inoperable or degraded, shutting down the plant may not necessarily be preferable, from a risk perspective, to continuing power operation over a usual repair time, giving priority to the repairs. The risk impact of the basic operational alternatives, i.e., continued operation or shutdown, was evaluated for failures in the RHR and standby service water (SSW) systems of a boiling-water reactor (BWR) nuclear power plant. A complete or partial failure of the SSW system fails or degrades not only the RHR system but other front-line safety systems supported by the SSW system. This report presents the methodology to evaluate the risk impact of LCOs and associated AOT; the results of risk evaluation from its application to the RHR and SSW systems of a BWR; the findings from the risk-sensitivity analyses to identify alternative operational policies; and the major insights and recommendations to improve the technical specifications action statements

  4. Assessing Students' Technical Skill Attainment

    Science.gov (United States)

    Jorgensen, Haley

    2010-01-01

    The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…

  5. Man, technology and risk

    Energy Technology Data Exchange (ETDEWEB)

    Renn, O

    1981-06-01

    Using the instruments of empirical social sciences, a cross-section study was conducted comprising experiments on qualitative risk characteristics, in-depth interviews on mechanisms of risk perception and representative surveys of the public on technical risk sources, in particular with regard to nuclear energy. The results of these studies show that person-related expectations in respect of risk consequences, the possibility of personal influencing control, the severeness of risk consequences and one's own risk propensity play a significant role in the evaluation of risks. (Translated from German, original report Juel-Spez--67).

  6. Towards technical interoperability in telemedicine.

    Energy Technology Data Exchange (ETDEWEB)

    Craft, Richard Layne, II

    2004-05-01

    For telemedicine to realize the vision of anywhere, anytime access to care, the question of how to create a fully interoperable technical infrastructure must be addressed. After briefly discussing how 'technical interoperability' compares with other types of interoperability being addressed in the telemedicine community today, this paper describes reasons for pursuing technical interoperability, presents a proposed framework for realizing technical interoperability, identifies key issues that will need to be addressed if technical interoperability is to be achieved, and suggests a course of action that the telemedicine community might follow to accomplish this goal.

  7. Argentina technical report

    International Nuclear Information System (INIS)

    2002-01-01

    At present, the Production Cyclotron Facility, installed at the Ezeiza Atomic Centre, is used for Tl-201 production; F-18 and I-123 production will be incorporated during this year. Concerning I-123 production, a system for irradiation of gaseous target has been developed in the frame of the IAEA Technical Assistance Project (ARG4085). The iodine production system delivers an ultra pure radioisotope via nuclear reactions: 124 Xe (p,2n) 123 Cs → 123 Xe → 123 I and 124 Xe (p,pn) 123 Xe → 123 I. This report describes the target and irradiation chamber design, the radiochemical purification process

  8. Technical Report 2000

    International Nuclear Information System (INIS)

    2001-01-01

    The technical memory 2000 of the Nuclear Regulatory Authority (NRA) of the Argentine Republic, compile the papers published in the subject on radiation protection and nuclear safety, safeguards and physical protection, and presented in congress or meetings of these specialities by personnel of the mentioned institution during 2000. In this edition the documents are presented on: Nuclear safety; Radiobiology; Occupational doses; Radiochemical; Environmental studies; Emergency plans; Radiation accidents; and International safeguards. Some of them are realized by agreements between the Nuclear Regulatory Authority of Argentina, universities and other national and international organizations

  9. HPCG Benchmark Technical Specification

    Energy Technology Data Exchange (ETDEWEB)

    Heroux, Michael Allen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Dongarra, Jack [Univ. of Tennessee, Knoxville, TN (United States); Luszczek, Piotr [Univ. of Tennessee, Knoxville, TN (United States)

    2013-10-01

    The High Performance Conjugate Gradient (HPCG) benchmark [cite SNL, UTK reports] is a tool for ranking computer systems based on a simple additive Schwarz, symmetric Gauss-Seidel preconditioned conjugate gradient solver. HPCG is similar to the High Performance Linpack (HPL), or Top 500, benchmark [1] in its purpose, but HPCG is intended to better represent how today’s applications perform. In this paper we describe the technical details of HPCG: how it is designed and implemented, what code transformations are permitted and how to interpret and report results.

  10. Technical bid evaluation

    International Nuclear Information System (INIS)

    Bruchhausen, E. v.

    1975-01-01

    It is shown which kind of problems arise for the owners of the project and what is the recommendable method of approach. A detailed description of the necessary working team, information in delegation of work and tasks of procedure, criteria of valuation and classification method. Examples of schemes are shown which are the basis of the technical bid evaluation: tables 'data of system/component' and 'scope of supply'. The procedure of normalization of the bids and of specifying the owners supplies are explained. The content of the final report is described. (HP) [de

  11. Technics and ethics

    International Nuclear Information System (INIS)

    Budnick, D.; Gemmel, F.

    1981-01-01

    Questions about the sense of life and the responsibility of technology are ethical questions. Young people in our neighbourhood who, compared to some time ago, see, hear and read much more of the world, deal with them increasingly. However, the permanent stream of information does not at all facilitate orientation but prevents many people from gaining some clearness about their own point of view. In asking the questions: where are we today. How can we get on. How can we start. The relation between ethics and technics is discussed under various aspects. (orig./HSCH) [de

  12. Technical reference manual for TIME4. Vol. 2

    International Nuclear Information System (INIS)

    Wilmot, R.D.; Ringrose, P.S.; Larkin, J.P.A.; Kleissen, F.A.T.

    1991-07-01

    This document is the Technical Reference Manual for the TIME4 model. TIME4 is the environmental change model developed for use in the probabilistic risk analysis of deep disposal of radioactive waste. The Technical Reference Manual describes the theoretical background to the model. The modelling method is described, followed by a review of related work and a detailed description for each sub-model. (author)

  13. Concept of risk: risk assessment and nuclear safety

    International Nuclear Information System (INIS)

    Thompson, P.B.

    1980-01-01

    The dissertation is a critical examination of risk assessment and its role in public policy. Nuclear power safety safety issues are selected as the primary source of illustrations and examples. The dissertation examines how risk assessment studies develop a concept of risk which becomes decisive for policy choices. Risk-assessment techniques are interpreted as instruments which secure an evaluation of risk which, in turn, figures prominently in technical reports on nuclear power. The philosophical critique is mounted on two levels. First, an epistemological critique surveys distinctions between the technical concept of risk and more familiar senses of risk. The critique shows that utilization of risk assessment re-structures the concept of risk. The technical concept is contrasted to the function of risk within a decision-maker's conceptual agenda and hierarchy of values. Second, an ethical critique exposes the value commitments of risk assessment recommendations. Although some of these values might be defended for policy decisions, the technical character of risk assessment obfuscates normative issues. Risk assessment is shown to be a form of factual enquiry which, nonetheless, represents a commitment to a specific selection of ethical and social values. Risk assessment should not be interpreted as a primary guide to decision unless the specific values incorporated into its concept of risk are stated explicitly and justified philosophically. Such a statement would allow value questions which have been sublimated by the factual tone of the analytic techniques to be debated on clear, social and ethical grounds

  14. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: C++ for Particle Physicists : 8 - 12.3.2004 (6 X 4-hour sessions) Introduction to the CERN EDMS : 9.3.2004 (1 day, free of charge) The EDMS MTF in Practice : 10.3.2004 (morning, free of charge) CLEAN-2002: Working in a Cleanroom : 10.3.2004 (afternoon, free of charge) The CERN EDMS for Engineers : 11.3.2004 (1 day, free of charge) LabVIEW hands-on (E):...

  15. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: LabVIEW base 1 : 25 - 27.2.2004(3 jours) Instructor-led WBTechT study or follow-up for Microsoft applications : 26.2.2004 (morning) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon - free of charge) C++ for Particle Physicists : 8 - 12.3.2004 (6 X 4-hour sessions) LabVIEW hands-on (E) : 16.3.2004 (afternoon) LabVIEW Basics 1 : 22 - 24.3.2004 ...

  16. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Instructor-led WBTechT study for Microsoft applications :12.2.2004 (morning) Instructor-led WBTechT study or follow-up for Microsoft applications : 19.2.2004 (morning) LabVIEW TestStand I (E) : 23 & 24.2.2004 (2 days) LabVIEW base 1 : 25 - 27.2.2004 (3 jours) Instructor-led WBTechT study or follow-up for Microsoft applications : 19.2.2004 (morning) CLEAN-2002 ...

  17. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Instructor-led WBTechT study or follow-up for Microsoft applications : 19.2.2004 (morning) LabVIEW TestStand I (E) : 23 & 24.2.2004 (2 days) LabVIEW base 1 : 25 - 27.2.2004 (3 jours) Instructor-led WBTechT study or follow-up for Microsoft applications : 26.2.2004 (morning) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon - free of charge) C++ for Pa...

  18. Technical training: places available

    CERN Multimedia

    HR Department

    2007-01-01

    CERN Technical Training: Open Courses (April - June 2007) The following course sessions are currently scheduled in the framework of the CERN Technical Training Programme 2007:   AutoCAD 2006 - niveau 1 (course in French): 25.4.- 26.4.2007 & 2.5. - 3.5.2007 (4 days in 2 modules, 5 places available) AutoCAD 2006 - niveau 1 (course in French): 27.6.- 28.6.2007 & 3.7. - 4.7.2007 (4 days in 2 modules, 5 places available) AutoCAD Mechanical 2006 (course in French) 21.6.-22.6.2007 (2 days, 8 places available) * NEW COURSE* Automate de securite S7 (course in French) 14.5.-16.5.2007 (3 days, 4 places available) * NEW COURSE* Automate de securite S7 (course in French): 9.5.-11.5.2007 (3 days, 4 places available) JCOP - Joint PVSS-JCOP Frameswork (course in English): 21.5.-25.5.2007 (5 days, 12 places available) JCOP - Finite State Machines in the JCOP Frameswork (course in English): 12.6.-14.6.2007 (3 days, 12 places available) LabVIEW Basics 1 (in English): 2.-4.5.2007 (3 days, 7 places ...

  19. TECHNICAL TRAINING SEMINAR

    CERN Multimedia

    Davide Vitè

    2002-01-01

    Wednesday 6 March TECHNICAL TRAINING SEMINAR from 9:30 to 16:45 - IT Amphitheatre - bldg. 31.3.004 Analog Devices DSP Day Thorsten Kistler (Application Engineer), Steffen Boerner (Product Specialist) / ANALOG DEVICES Munich Trying to meet your design challenges, Analog Devices compiles application information and offers chipsets, software, reference designs and mixed-signal, application specific DSPs, for a range of real-time signal processing applications. This seminar will present the latest 16bit fixed-point and 32bit floating-point DSPs (roadmaps; internal architectures, blocks, features benchmarks), with their software, development kits and emulators: Fixed-Point DSP-Family, ADSP-218x and ADSP-219x Blackfin DSP SHARC-Family, 2106x and 2116x TigerSHARC Industrial Contact: François Caloz, Sasco-Spoerle GmbH Language: English Free seminar, no registration Organiser: Davide Vitè / HR-TD / 75141 Davide.Vite@cern.ch Please read the full information on the Technical Training Seminars...

  20. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: C++ for Particle Physicists : 8 - 12.3.2004 (6 X 4-hour sessions) Introduction to the CERN EDMS : 9.3.2004 (1 day, free of charge) The EDMS MTF in Practice : 10.3.2004 (morning, free of charge) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon, free of charge) The CERN EDMS for Engineers : 11.3.2004 (1 day, free of charge) LabVIEW...

  1. Technical Training: Places available**

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The JAVA Programming Language Level 1 : 9 & 10.1.2004 (2 days) LabVIEW TestStand I (E) : 23 & 24.2.2004 (2 days) LabVIEW base 1 : 25 - 27.2.2004 (3 jours) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon - free of charge) C++ for Particle Physicists : 8 - 12.3.2004 ( 6 X 4-hour sessions) LabVIEW hands-on (E) 16.3...

  2. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Project Planning with MS-Project :6 & 13.5.2004 (2 days) Word 2003 - niveau 1 : 10 & 11.5.2004 (2 jours) Oracle 9i : SQL : 17 - 19.5.2004 (3 days) Word 2003 - niveau 2 : 24 & 25.5.2004 (2 jours) EXCEL 2003 - niveau 1: 27 & 28.5.2004 (2 jours) STEP7 Programming Level 1 : 1 - 4.6.2004 (4 days) Oracle 9i : Programming with PL/SQL : 2 - 4.6.2...

  3. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Hands-on Introduction to Python Programming: 28 - 30.6.2005 (3 days) Introduction to ANSYS: 28.6 - 1.7.2005 (4 days) IT3T/3 - Working remotely with Windows XP: 28.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/4 - Editing Websites with Frontpage 2003: 30.6.2005 (IT Technical Training Tutorial, free of charge) LabVIEW base 1 : 4 - 6.7.2005 (3 jours) LabVIEW Basics 2: 7 - 8.7.2005 (2 days) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.7.2005 (1 jour) FrontPage 2003 - niveau 1 : 6-7.7.2005 (2 jours) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoCorrect, Find/Replace) : 4.7.2005 (afternoon) WORD 2003 (Short Course II) - HowTo... Mail merge: 5.7.2005 (afternoon) WORD 2003 (Short Course III) - HowTo... Work with long documents : 6.7.2005 (afternoon) ACCES...

  4. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Joint PVSS JCOP Framework: 8 - 12.8.2005 (5 days) FrontPage 2003 - niveau 1 : 1 - 2.9.2005 (2 jours) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.9.2005 (1 jour) LabVIEW Basics 1 : 5 - 7.9.2005 (3 days, dates to be confirmed) Introduction à Windows XP au CERN : 12.9.2005 (1 demi-journée) FrontPage 2003 - niveau 2 : 15 - 16.9.2005 (2 jours) AutoCAD 2005 - niveau 1 : 22, 23, 28, 29.9.2005 (4 jours) MAGNE-05 - Magnétisme pour l'électrotechnique : 27 - 29.9.2005 (3 jours) LabVIEW Application Development (Intermediate I): 5 - 7.12.2005 (3 days) LabVIEW Advanced Programming (Intermediate 2): 8 - 9.12.2005 (2 days) ENSEIGNEMENT TECHNIQUE TECHNICAL TRAINING Monique Duval 74924 technical.training@cern.ch

  5. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Hands-on Introduction to Python Programming: 28 - 30.6.2005 (3 days) Introduction to ANSYS: 21 - 24.6.2005 (4 days) IT3T/3 - Working remotely with Windows XP: 28.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/4 - Editing Websites with Frontpage 2003: 30.6.2005 (IT Technical Training Tutorial, free of charge) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.7.2005 (1 jour) FrontPage 2003 - niveau 1 : 6-7.7.2005 (2 jours) LabVIEW base 1 : 4 - 6.7.2005 (3 jours) LabVIEW Basics 2: 7 - 8.7.2005 (2 days) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoCorrect, Find/Replace) : 4.7.2005 (afternoon) WORD 2003 (Short Course II) - HowTo... Mail merge: 5.7.2005 (afternoon) WORD 2003 (Short Course III) - HowTo (4 mornings) EXCEL 2003 (Short Course I) - HowTo... Work ...

  6. Technical Training: Places Available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Technical Training Monique Duval - Tel.74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Oracle 9i: SQL: 17 - 19.5.2004 (3 days) Word 2003 - niveau 2 : 24 & 25.5.2004 (2 jours) EXCEL 2003 - niveau 1 : 27 & 28.5.2004 (2 jours) STEP7 Programming Level 1: 1 - 4.6.2004 (4 days) Oracle 9i : Programming with PL/SQL: 2 - 4.6.2004 (3 days) CST Microwave Studio: 3 & 4.6.2004 (2 days) Oracle 9i : New f...

  7. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Technical Training Monique Duval - Tel.74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Word 2003 - niveau 2 : 24 & 25.5.2004 (2 jours) VisualEliteHDL : 25 & 26.5.2004 (2 days) EXCEL 2003 - niveau 1 : 27 & 28.5.2004 (2 jours) STEP7 Programming Level 1: 1 - 4.6.2004 (4 days) Oracle 9i : Programming with PL/SQL: 2 - 4.6.2004 (3 days) CST Microwave Studio: 3 & 4.6.2004 (2 days) Oracle 9...

  8. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Instructor-led WBTechT study or follow-up for Microsoft applications : 1.4.2004 (morning) FrontPage XP - niveau 1 : 5 & 6.4.2004 (2 jours) AutoCAD 2002 - niveau 1 : 19, 20.4 et 3, 4.5.2004 (4 jours) Oracle 8i/9i - Develop Web-based Applications with PL/SQL : 19 & 20.4.2004 (2 days) Introduction to ANSYS : 20 - 23.4.2004 (4 day...

  9. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: FrontPage XP - niveau 2 : 26 & 27.4.2004 (2 jours) The Joint PVSS JCOP Framework : 26 - 30.4.2004 (5 days) Computational Electromagnetics with the ELEKTRA Module of OPERA-3D : 27 & 28.4.2004 (2 days) Hands-on Introduction to Python Programming : 3 - 5.5.2004 (3 days) LabVIEW Base 2 : 6 & 7.5.2004 (2 jours) Project Pla...

  10. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Computational Electromagnetics with the ELEKTRA Module of OPERA-3D : 27 & 28.4.2004 (2 days) Hands-on Introduction to Python Programming : 3 - 5.5.2004 (3 days) LabVIEW Base 2 : 6 & 7.5.2004 (2 jours) Project Planning with MS-Project : 6 & 13.5.2004 (2 days) Word 2003 - niveau 1 : 10 & 11.5.2004 (2 jours) Oracle 9i : SQL : 10 - 12.5.2004 (3...

  11. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: AutoCAD 2002 - niveau 1 : 19, 20.4 et 3, 4.5.2004 (4 jours) Oracle 8i/9i - Develop Web-based Applications with PL/SQL : 19 & 20.4.2004 (2 days) Introduction to ANSYS : 20 - 23.4.2004 (4 days) LabVIEW Hands-on : 20.4.2004 (half-day, p.m.) FrontPage XP - niveau 2 : 26 & 27.4.2004 (2 jours) The Joint PVSS JCOP Framework : 26 -...

  12. TECHNICAL TRAINING: Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Hands-on Introduction to Python Programming : 12 - 14.11.03(3 days) ACCESS 2000 - niveau 1 : 13 & 14.11.03 (2 jours) C++ for Particle Physicists : 17 - 21.11.03 (6 X 3-hour lectures) Programmation automate Schneider TSX Premium - niveau 2 : 18 - 21.11.03 (4 jours) Project Planning with MS-Project  (free of charg...

  13. TECHNICAL TRAINING: Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval Tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The EDMS-MTF in practice (free of charge) : 28 -  30.10.03 (6 half-day sessions) AutoCAD 2002 – Level 1 : 3, 4, 12, 13.11.03 (4 days) LabVIEW TestStand ver. 3 : 4 & 5.11.03 (2 days) Introduction to PSpice : 4.11.03 p.m. (half-day) Hands-on Introduction to Python Programming : 12 – 14.11.03 (3 days) ACCESS ...

  14. Technical Writing: Past, Present and Future

    Science.gov (United States)

    Mathes, J. C. (Compiler); Pinelli, T. E. (Compiler)

    1981-01-01

    The training of technical writers and the objectives of such education are discussed. Special emphasis was placed on the communication between technical personnel and non-technical personnel. The liabilities that affect technical writers were also discussed.

  15. Technical Support Essentials Advice to Succeed in Technical Support

    CERN Document Server

    Sanchez, Andrew

    2010-01-01

    Technical Support Essentials is a book about the many facets of technical support. It attempts to provide a wide array of topics to serve as points of improvement, discussion, or simply topics that you might want to learn. The topics range from good work habits to the way technical supportgroups establish their own style of work. This book applies theories, models, and concepts synthesized from existing research in other fields-such as management, economics, leadership, and psychology-and connects them to technical support. The goal is to build on the work of others and allow their success to

  16. Technical standards in the law of technical safety

    International Nuclear Information System (INIS)

    Marburger, P.

    1985-01-01

    Technical standards are of great importance for the closer definition of inexact terms of law, for instance ''generally accepted technical rules'', ''state of the art'', ''state of science and technology'' or similar normative terms, in the law of technical safety. The paper discusses with whom the authority for regulating this sector of law rests, deals with the different ways of how technical standards are used by the law (''anticipated expert opinion'', reference to such standards in law and administration) and points out demands on the procedure of standardization. (orig.) [de

  17. Transportation Technical Environmental Information Center index

    Energy Technology Data Exchange (ETDEWEB)

    Davidson, C. A.; Foley, J. T.

    1980-10-01

    In an effort to determine the environmental intensities to which energy materials in transit may be exposed, a Data Center of technical environmental information has been established by Sandia National Laboratories, Division 5523, for the DOE Office of Transportation Fuel Storage. This document is an index which can be used to request data of interest. Access to the information held is not limited to Sandia personnel. The purpose of the Transportation Technical Environmental Information Center is to collect, analyze, store, and make available descriptions of the environment of transportation expressed in engineering terms. The data stored in the Center are expected to be useful in a variety of transportation related analyses. Formulations of environmental criteria for shipment of cargo, risk assessments, and detailed structural analyses of shipping containers are examples where these data have been applied. For purposes of indexing and data retrieval, the data are catalogued under two major headings: Normal and Abnormal Environments.

  18. Bubbles, shocks and elementary technical trading strategies

    Science.gov (United States)

    Fry, John

    2014-01-01

    In this paper we provide a unifying framework for a set of seemingly disparate models for bubbles, shocks and elementary technical trading strategies in financial markets. Markets operate by balancing intrinsic levels of risk and return. This seemingly simple observation is commonly over-looked by academics and practitioners alike. Our model shares its origins in statistical physics with others. However, under our approach, changes in market regime can be explicitly shown to represent a phase transition from random to deterministic behaviour in prices. This structure leads to an improved physical and econometric model. We develop models for bubbles, shocks and elementary technical trading strategies. The list of empirical applications is both interesting and topical and includes real-estate bubbles and the on-going Eurozone crisis. We close by comparing the results of our model with purely qualitative findings from the finance literature.

  19. Transportation Technical Environmental Information Center index

    International Nuclear Information System (INIS)

    Davidson, C.A.; Foley, J.T.

    1980-10-01

    In an effort to determine the environmental intensities to which energy materials in transit may be exposed, a Data Center of technical environmental information has been established by Sandia National Laboratories, Division 5523, for the DOE Office of Transportation Fuel Storage. This document is an index which can be used to request data of interest. Access to the information held is not limited to Sandia personnel. The purpose of the Transportation Technical Environmental Information Center is to collect, analyze, store, and make available descriptions of the environment of transportation expressed in engineering terms. The data stored in the Center are expected to be useful in a variety of transportation related analyses. Formulations of environmental criteria for shipment of cargo, risk assessments, and detailed structural analyses of shipping containers are examples where these data have been applied. For purposes of indexing and data retrieval, the data are catalogued under two major headings: Normal and Abnormal Environments

  20. Technical specification use and application

    International Nuclear Information System (INIS)

    Williamson, D.; Hoffman, D.R.

    1991-01-01

    Since early 1988 intensive efforts have been under way to produce a new and improved Standard Technical Specification. The program involves a coordinated effort between utility personnel representing each of the four nuclear steam supply system (NSSS) product lines, the NSSS vendors, and the US Nuclear Regulatory Commission (NRC). This intensive work period is actually the culmination of a decade of rhetoric about shortcomings of the existing technical specifications. Work on the improved technical specifications provided a unique forum for intense philosophical discussions between the users and enforcers of technical specifications, the outcome of which could have an impact on all licensees. Some of the more intriguing difficulties in the use and application of existing technical specifications, as well as discussions of the resolutions being applied in the improved technical specifications and the dilemmas remaining to be resolved are discussed in the paper

  1. Technical applications of aerogels

    International Nuclear Information System (INIS)

    Hrubesh, L.W.

    1997-01-01

    Aerogel materials posses such a wide variety of exceptional properties that a striking number of applications have developed for them. Many of the commercial applications of aerogels such as catalysts, thermal insulation, windows, and particle detectors are still under development and new application as have been publicized since the ISA4 Conference in 1994: e.g.; supercapacitors, insulation for heat storage in automobiles, electrodes for capacitive deionization, etc. More applications are evolving as the scientific and engineering community becomes familiar with the unusual and exceptional physical properties of aerogels, there are also scientific and technical application, as well. This paper discusses a variety of applications under development at Lawrence Livermore National Laboratory for which several types of aerogels are formed in custom sizes and shapes. Particular discussions will focus on the uses of aerogels for physics experiments which rely on the exceptional, sometimes unique, properties of aerogels

  2. Socio-Technical Structure

    DEFF Research Database (Denmark)

    Rose, Jeremy; Lindgren, Rikard; Henfridsson, Ole

    2004-01-01

    a reference discipline in its own right (in other words a theory exporter), this paper offers an example of integrative theory development. Instead of adapting a theory from another discipline or building a theory from empirical data, we examine the structure concept in some of its various theoretical......When it comes to investigating the relationship between the social and the technical, IS has been a net importer of theories. These theories often carry differing interpretations of central concepts, which then become both confusing and difficult to integrate. In response to calls for IS to become...... adaptations in IS and try to integrate them to produce theory that focuses on IS concerns whilst resolving some of the major areas of contention. Both social and technological versions of structure are investigated through three theoretical IS perspectives drawn from different reference disciplines. The first...

  3. LLNL 1981: technical horizons

    International Nuclear Information System (INIS)

    1981-07-01

    Research programs at LLNL for 1981 are described in broad terms. In his annual State of the Laboratory address, Director Roger Batzel projected a $481 million operating budget for fiscal year 1982, up nearly 13% from last year. In projects for the Department of Energy and the Department of Defense, the Laboratory applies its technical facilities and capabilities to nuclear weapons design and development and other areas of defense research that include inertial confinement fusion, nonnuclear ordnances, and particle-beam technology. LLNL is also applying its unique experience and capabilities to a variety of projects that will help the nation meet its energy needs in an environmentally acceptable manner. A sampling of recent achievements by LLNL support organizations indicates their diversity

  4. Technical Training Seminar

    CERN Multimedia

    2003-01-01

    Wednesday 19 November From 9:30 to 17:30 - IT Amphitheatre bldg.31 3-004 2003 Data Transmission Design Seminar - TEXAS INSTRUMENTS The one-day 2003 Data Transmission Design Seminar is part of a series of technical seminars produced by Texas Instruments. This series of seminars will introduce system solutions based on different standards according to their respective requirements. It will include topics containing a blend of basic principles and hands-on application examples, along with layout-guidelines. • Basics and Practical Examples of Data-Transmission • Low Voltage Differential Signaling (LVDS) • Connectivity and PC-based Links • Industrial Interfaces • Parallel Bus Systems and Clock-Distribution-Circuits (CDC) This Seminar will be of interest to hardware designers and system engineers dealing with the realization of system- or board-level interfaces based on various transmission standards. Language: English Free seminar, no registration Organiser: John ...

  5. Technical Math For Dummies

    CERN Document Server

    Schoenborn, Barry

    2010-01-01

    Technical Math For Dummies is your one-stop, hands-on guide to acing the math courses you’ll encounter as you work toward getting your degree, certifacation, or�license in the skilled trades. You’ll get easy-to-follow, plain-English guidance on mathematical formulas and methods that professionals use every day in the automotive, health, construction, licensed trades, maintenance, and other trades. You’ll learn how to apply concepts of algebra, geometry, and trigonometry and their formulas related to occupational areas of study. Plus, you’ll find out how to perform basic arithmetic

  6. Technical Training: ELEC-2005

    CERN Multimedia

    Davide Vitè

    2005-01-01

    ELEC-2005 - Electronics in High Energy Physics: Autumn Term (November-December 2005) ELEC-2005 is a new course series on modern electronics, given by CERN physicists and engineers within the framework of the 2005 Technical Training Programme, in an extended format of the ELEC-2002 course series. This new, comprehensive course series is designed for people who are not electronics specialists, for example physicists, engineers and technicians working at or visiting the laboratory, who use or will use electronics in their present or future activities, in particular in the context of the LHC accelerator and experiments. ELEC-2005 is composed of four Terms. The Winter (Introduction to electronics in HEP), Spring (Integrated circuits and VLSI technology for physics), and Summer (System electronics for physics: Issues) Terms already took place. The Autumn Term: Electronics applications in HEP experiments (November-December, 10 lectures) is now open for online registration, and will start on November 8th with the...

  7. Final technical report

    DEFF Research Database (Denmark)

    Juhl, Thomas Winther; Nielsen, Jakob Skov

    gas jet chamber and laser beam path from the final focusing mirror. The project consists of three phases: Phase 1: Fundamental studies of cutting front mechanisms, beam propagation, nozzle design and chemical reactions in the cut kerf with special emphasize on high laser powers and thick sections...... cutting nozzle which can be adjusted independently to the laser beam has been developed. The position of the focus relative the workpiece can be adjusted to cutting applications with relatively large processing windows, i.e. both mild and stainless steels, and of a broad thickness range. A build-in auto......This project entails research with the goal to extend laser cutting of steel based metals to thickness above 20 mm and laser powers in the 10 kW range, with adequate accuracy and economically viable cutting speeds. The technical approach is to develop mirror based cutting heads with truly coaxial...

  8. TECHNICAL TRAINING PROGRAMME

    CERN Multimedia

    Davide Vitè

    2002-01-01

    CLEAN-2002: Working in a Cleanroom A new, free of charge, half-day seminar is offered in the context of Technical Training for the LHC, for personnel working or managing activities in a cleanroom (for example physicists, engineers and technicians working at or visiting the laboratory). CLEAN-2002 is aimed at raising awareness about good working practices in a cleanroom, and at providing practical examples, analysis tools, and documentation. Specific problems put forward beforehand by attendees will also be addressed, if possible. More information and registration is available HERE The next session, in English, will be on 24.4 (afternoon). Other sessions, in French and English, will be offered following demand. Organiser: Davide Vitè / HR-TD / 75141 Davide.Vite@cern.ch

  9. Technical knowledge creation

    DEFF Research Database (Denmark)

    Søberg, Peder Veng

    2017-01-01

    Purpose - The purpose of the paper is to amend shortcomings of existing theory concerning organizational learning and knowledge management. Design/methodology/approach – The paper reviews and refines existing theory. Findings - Findings from cognitive neuroscience suggest that technical knowledge...... domains essential for product development are largely nonlinguistic. Operations management/strategy tools enable the use of tacit knowledge in its tacit form and discourage premature standardization. Similarly, language use introduces standardization, which if introduced prematurely, causes incrementalism...... in line with findings from product development research. However, frameworks on organizational learning and knowledge management focus on language development and neglect use of tacit knowledge and the benefits involved with allowing elements of new product ideas to mature in a tacit form. Originality...

  10. Technical Due Diligence

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Varano, Mattia

    2011-01-01

    carried out for buyers or sellers involved in real estate transactions. It can also be part of mergers including real estate and other assets or part of facilities management outsourcing. This paper is based on a case study and an interview survey of companies involved in TDD consulting in Denmark......Technical Due Diligence (TDD) as an evaluation of the performance of constructed facilities has become an important new field of practice for consultants. Before the financial crisis started in autumn 2008 it represented the fastest growing activity in some consulting companies. TDD is mostly...... and Italy during 2009. The research identifies the current practice and compares it with the recommended practice in international guidelines. The current practice is very diverse and could in many cases be improved by a more structured approach and stricter adherence to international guidelines. However...

  11. ITER technical basis

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    Following on from the Final Report of the EDA(DS/21), and the summary of the ITER Final Design report(DS/22), the technical basis gives further details of the design of ITER. It is in two parts. The first, the Plant Design specification, summarises the main constraints on the plant design and operation from the viewpoint of engineering and physics assumptions, compliance with safety regulations, and siting requirements and assumptions. The second, the Plant Description Document, describes the physics performance and engineering characteristics of the plant design, illustrates the potential operational consequences foe the locality of a generic site, gives the construction, commissioning, exploitation and decommissioning schedule, and reports the estimated lifetime costing based on data from the industry of the EDA parties.

  12. ITER technical basis

    International Nuclear Information System (INIS)

    2002-01-01

    Following on from the Final Report of the EDA(DS/21), and the summary of the ITER Final Design report(DS/22), the technical basis gives further details of the design of ITER. It is in two parts. The first, the Plant Design specification, summarises the main constraints on the plant design and operation from the viewpoint of engineering and physics assumptions, compliance with safety regulations, and siting requirements and assumptions. The second, the Plant Description Document, describes the physics performance and engineering characteristics of the plant design, illustrates the potential operational consequences foe the locality of a generic site, gives the construction, commissioning, exploitation and decommissioning schedule, and reports the estimated lifetime costing based on data from the industry of the EDA parties

  13. Mechanical engineering department technical review

    International Nuclear Information System (INIS)

    Carr, R.B.; Denney, R.M.

    1981-01-01

    The Mechanical Engineering Department Technical Review is published to: (1) inform the readers of various technical activities within the department, (2) promote exchange of ideas, and (3) give credit to the personnel who are achieving the results. The report is formatted into two parts: technical acievements and publication abstracts. The first is divided into eight sections, one for each division in the department providing the reader with the names of the personnel and the division accomplishing the work

  14. Mechanical Engineering Department. Technical review

    Energy Technology Data Exchange (ETDEWEB)

    Simecka, W.B.; Condouris, R.A.; Talaber, C. (eds.)

    1980-01-01

    The Mechanical Engineering Department Technical Review is published to (1) inform the readers of various technical activities within the Department, (2) promote exchange of ideas, and (3) give credit to the personnel who are achieving the results. The report is formatted into two parts: technical achievements and publication abstracts. The first is divided into eight sections, one for each Division in the Department providing the reader with the names of the personnel and the Division accomplishing the work.

  15. Mechanical Engineering Department technical abstracts

    International Nuclear Information System (INIS)

    Denney, R.M.

    1982-01-01

    The Mechanical Engineering Department publishes listings of technical abstracts twice a year to inform readers of the broad range of technical activities in the Department, and to promote an exchange of ideas. Details of the work covered by an abstract may be obtained by contacting the author(s). Overall information about current activities of each of the Department's seven divisions precedes the technical abstracts

  16. Mechanical Engineering Department Technical Review

    International Nuclear Information System (INIS)

    Carr, R.B.; Denney, R.M.

    1981-01-01

    The Mechanical Engineering Department Technical Review is published to inform readers of various technical activities within the Department, promote exchange of ideas, and give credit to personnel who are achieving the results. The report is presented in two parts: technical achievements and publication abstracts. The first is divided into seven sections, each of which reports on an engineering division and its specific activities related to nuclear tests, nuclear explosives, weapons, energy systems, engineering sciences, magnetic fusion, and materials fabrication

  17. TECHNICAL CULTURE AND HUMAN AXJOSPHERE

    OpenAIRE

    ­Krystyna Chałas

    2014-01-01

    Technical culture is the value of each historical period. It is the subject of the ongoing development. While it is a value which is associated with different categories of values, mainly material, cognitive, social. Between culture and these three categories of values ​ there is a cognitive effect. Technical culture determines the quality of human axjosphere. The aim of this study is to show the relationships and dependencies between technical culture and the structures in which a person liv...

  18. The story of technical cooperation

    International Nuclear Information System (INIS)

    Park, Yang Taek

    1989-09-01

    This book gives descriptions of technical cooperation, which is about why does technology transfer?, process of technology transfer with model, decisive cause and cooperation of technology transfer, cost and effect of technology transfer, historical experience of technology transfer, cases of technology transfer by field such as rubber tire, medicine and computer industry and automobile industry, technology transfer process and present condition of technical cooperation, and strategy for rising of technical cooperation : selection of technology for object of cooperation and development of human resources.

  19. Mechanical Engineering Department. Technical review

    International Nuclear Information System (INIS)

    Simecka, W.B.; Condouris, R.A.; Talaber, C.

    1980-01-01

    The Mechanical Engineering Department Technical Review is published to (1) inform the readers of various technical activities within the Department, (2) promote exchange of ideas, and (3) give credit to the personnel who are achieving the results. The report is formatted into two parts: technical achievements and publication abstracts. The first is divided into eight sections, one for each Division in the Department providing the reader with the names of the personnel and the Division accomplishing the work

  20. ERLN Technical Support for Labs

    Science.gov (United States)

    The Environmental Response Laboratory Network provides policies and guidance on lab and data requirements, Standardized Analytical Methods, and technical support for water and radiological sampling and analysis

  1. The logic of Technical Standardisation

    DEFF Research Database (Denmark)

    Nedergaard, Peter

    In this paper technical standardisation is understood and explained in a model where economic analysis is coupled with an analysis of the political system as proposed in rational choice theory. The aim is to answer both the question why various countries (e.g. the United States versus European...... countries) let either the market or public intervention determine the mode of technical standardisation and the possible implications of these two ways of organizing technical standardisation from an economic and a political point of view. Based upon the analysis of the paper a couple of general policy...... recommendations are made concerning the mode of technical standardisation....

  2. 76 FR 79536 - Security Zones; Captain of the Port Lake Michigan; Technical Amendment

    Science.gov (United States)

    2011-12-22

    ... Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children...-AA87 Security Zones; Captain of the Port Lake Michigan; Technical Amendment AGENCY: Coast Guard, DHS...

  3. Predictors of employer satisfaction: technical and non-technical skills.

    Science.gov (United States)

    Danielson, Jared A; Wu, Tsui-Feng; Fales-Williams, Amanda J; Kirk, Ryan A; Preast, Vanessa A

    2012-01-01

    Employers of 2007-2009 graduates from Iowa State University College of Veterinary Medicine were asked to respond to a survey regarding their overall satisfaction with their new employees as well as their new employees' preparation in several technical and non-technical skill areas. Seventy-five responses contained complete data and were used in the analysis. Four technical skill areas (data collection, data interpretation, planning, and taking action) and five non-technical skill areas (interpersonal skills, ability to deal with legal issues, business skills, making referrals, and problem solving) were identified. All of the skill area subscales listed above had appropriate reliability (Cronbach's alpha>0.70) and were positively and significantly correlated with overall employer satisfaction. Results of two simultaneous regression analyses indicated that of the four technical skill areas, taking action is the most salient predictor of employer satisfaction. Of the five non-technical skill areas, interpersonal skills, business skills, making referrals, and problem solving were the most important skills in predicting employer satisfaction. Hierarchical regression analysis revealed that all technical skills explained 25% of the variation in employer satisfaction; non-technical skills explained an additional 42% of the variation in employer satisfaction.

  4. Engineering risks

    International Nuclear Information System (INIS)

    Hauptmanns, U.; Werner, W.

    1991-01-01

    The book describes the methods of risk analysis and explains the procedures and results of a number of studies including the German Risk Study, Phase B and NUREG-1150. After defining basic concepts the methods of risk analysis are treated. In the field of nuclear energy studies for light water, fast breeder and high temperature reactors and for the nuclear fuel cycle are discussed; their relevant results are presented. Additionally, precursors to severe accidents are dealt with. Risk studies for process plants are described; their objectives and methods of analysis are examined. Furthermore, their approaches are compared with that of the German Risk Study, Phase A. Risk comparisons for nuclear, conventional and renewable energy sources are critically examined. Technical and legal aspects of the safety evaluation for nuclear power plants in the FRG and the potential of the combined use of the deterministic and probabilistic approaches are discussed. The book concludes with an overview of probabilistic safety goals in different countries. (orig.) With 52 figs

  5. Aligning Career and Technical Education

    Science.gov (United States)

    Workman, Ed; Stubbs, Joyce

    2011-01-01

    The issues and concerns facing Kentucky Career and Technical Teacher Education (KY CTTE), university teacher educators and state department Career and Technical Education (CTE) leaders in providing and preparing the best CTE teachers possible are not unique to Kentucky. In an effort to better understand these issues and concerns a team of state…

  6. The Digital technical documentation handbook

    CERN Document Server

    Schultz, Susan I; Kavanagh, Frank X; Morse, Marjorie J

    1993-01-01

    The Digital Technical Documentation Handbook describes the process of developing and producing technical user information at Digital Equipment Corporation. * Discusses techniques for making user information _more effective * Covers the draft and reviewprocess, the production and distribution of printed and electronic media, archiving, indexing, testing for usability, and many other topics * Provides quality assurance checklists, contains a glossary and a bibliography of resources for technicalcommunicators

  7. Technical Education and Economic Growth

    Indian Academy of Sciences (India)

    First page Back Continue Last page Graphics. Technical Education and Economic Growth. Technical Education and Economic Growth. Review of the Present Status. Expanding no.s and impairment of quality; Faculty shortage; Grim situation at Masters and PhD levels; Regional imbalance; Absence of International flavour ...

  8. International Scientific and Technical Organisations

    International Nuclear Information System (INIS)

    Nunez-Lagos Rogla, R.

    2003-01-01

    The nuclear scientific and technical world is well aware of the EURATOM and IAEA activities but usually other international scientific and technical organisations relevant for their ordinary work are unknown. In this article three international organisations are described briefly, the International Union of Pure and Applied Physics (IUPAP). International Union of Pure and Applied chemistry (IUPAC) and the international council of Science (ICSU). (Author)

  9. PIAAC Technical Standards and Guidelines

    Science.gov (United States)

    OECD Publishing, 2014

    2014-01-01

    The Programme for International Assessment of Adult Competencies (PIAAC) will establish technical standards and guidelines to ensure that the survey design and implementation processes of PIAAC yield high-quality and internationally comparable data. This document provides a revised version of the technical standards and guidelines originally…

  10. EDI and the Technical Communicator.

    Science.gov (United States)

    Eiler, Mary Ann

    1994-01-01

    Assesses the role of technical communicators in electronic data interchange (EDI). Argues that, as experts in information design, human factors, instructional theory, and professional writing, technical communicators should be advocates of standard documentation protocols and should rethink the traditional concepts of "document" to…

  11. Risk perception

    International Nuclear Information System (INIS)

    Ahearne, J.F.

    1989-01-01

    Conflicts on technical issues frequently involve disagreements between the public and the technologists. This paper summarizes the major characteristics of three groups of technologists and four groups of the public which lead to many of the disagreements. To advance the mores of making decisions involving complex science or technology, technologists should develop an understanding of what information is needed for decisions, of the need for two-way communication with the public, and to become responsible for the accuracy and honesty of risk communication messages

  12. Technical training - Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 16.5.2006 (May-November course sessions) Technical Training: Places available The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Title Hours Date Language ACROBAT 7.0 : Utilisation de fichiers PDF 8 8.05.06 F WORD 2003 - niveau 2 : ECDL 16 22-23.05.06 23-24.05.06 F Comprehensive VHDL for FPGA Design 40 29.05-2.06.06 E C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls 32 30.05-2.06.06 E ACROBAT 7.0 : Utilisation de fichiers PDF 24 7-9.06.06 E AutoCAD Mechanical 2006 16 13-14.06.06 F CERN EDMS for Local Administrators 16 13-14.06.06 E LabVIEW Base 2 32 27.06-5.07.06 F C++ Programming Part 3 - Templates and the STL (Standard Template Library) 16 27-28.06.06 E C++ Programming Part 4 - Exceptions 8 29.06.06 E FrontPage 2003 - niveau 1 16 29-...

  13. GEM Technical Design Report

    International Nuclear Information System (INIS)

    1993-01-01

    The GEM collaboration was formed in June 1991 to develop a major detector for the SSC. The primary physics objectives of GEM are those central to the motivation for the SSC, to study high p T physics - exemplified by the search for Higgs bosons - and to search for new physics beyond the standard model. The authors present in this Technical Design Report (TDR) a detector with broad capabilities for the discovery and subsequent study of electroweak symmetry breaking, the origin of mass and flavor, and other physics requiring precise measurements of gammas, electrons, and muons - hence the name, GEM. In addition, as a design goal, they have taken care to provide the robustness needed to do the physics that requires high luminosity. Finally, good coverage and hermeticity allow the detection of missing transverse energy, E T . The GEM design emphasizes clean identification and high resolution measurement of the primary physics signatures for high p T physics. The approach is to make precise energy measurements that maximize the sensitivity to rare narrow resonances, to detect the elementary interaction products (quarks, leptons, and photons), and to build in the features required to reduce backgrounds

  14. TECHNICAL TRAINING SEMINAR

    CERN Multimedia

    Davide Vitè

    2002-01-01

    Wednesday 6 March from 9:30 to 16:45 - IT Auditorium - bldg. 31 3-004 Analog Devices DSP Day Thorsten Kistler (Application Engineer), Steffen Boerner (Product Specialist) / ANALOG DEVICES Munich Trying to meet your design challenges, Analog Devices compiles application information and offers chipsets, software, reference designs and mixed-signal, application specific DSPs, for a range of real-time signal processing applications. This seminar will present the latest 16bit fixed-point and 32bit floating-point DSPs (roadmaps; internal architectures, blocks, features benchmarks), with their software, development kits and emulators: Fixed-Point DSP-Family, ADSP-218x and ADSP-219x Blackfin DSP SHARC-Family, 2106x and 2116x TigerSHARC Industrial Contact: François Caloz, Sasco-Spoerle GmbH Language: English Free seminar, no registration Organiser: Davide Vitè / HR-TD / 75141 Davide.Vite@cern.ch Please read the full information on the Technical Training Seminars pages here or contact the organiser.

  15. TECHNICAL TRAINING SEMINAR

    CERN Multimedia

    Davide VITÈ

    2002-01-01

    Wednesday 6 March   from 9:30 to 16:45 - IT Auditorium - bldg. 31 3-004 Analog Devices DSP Day Thorsten Kistler (Application Engineer), Steffen Boerner (Product Specialist) / ANALOG DEVICES Munich Trying to meet your design challenges, Analog Devices compiles application information and offers chipsets, software, reference designs and mixed-signal, application specific DSPs, for a range of real-time signal processing applications. This seminar will present the latest 16bit fixed-point and 32bit floating-point DSPs (roadmaps; internal architectures, blocks, features benchmarks), with their software, development kits and emulators: Fixed-Point DSP-Family, ADSP-218x and ADSP-219x Blackfin DSP SHARC-Family, 2106x and 2116x TigerSHARC Industrial Contact: François Caloz, Sasco-Spoerle GmbH Language: English Free seminar, no registration Organiser: Davide Vitè / HR-TD / 75141 Davide.Vite@cern.ch Please read the full information on the Technical Training Seminars pages here or con...

  16. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: AutoCAD 2002 - niveau 1 : 13, 14, 23, 24.09.2004 (4 jours) Introduction to the CERN EDMS : 22.6.2004 (1 day) The CERN EDMS for local administrators : 23 & 24.6.2004 (2 days) MAGNE-04 : Magnétisme pour l'électrotechnique : 6 - 8.7.2004 (3 jours) Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE : 7 & 8.9.2004 (2 jours) ENSEIGNEMENT TECHNIQUE TECHNICAL TRAINING...

  17. GEM Technical Design Report

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-31

    The GEM collaboration was formed in June 1991 to develop a major detector for the SSC. The primary physics objectives of GEM are those central to the motivation for the SSC, to study high p{sub T} physics - exemplified by the search for Higgs bosons - and to search for new physics beyond the standard model. The authors present in this Technical Design Report (TDR) a detector with broad capabilities for the discovery and subsequent study of electroweak symmetry breaking, the origin of mass and flavor, and other physics requiring precise measurements of gammas, electrons, and muons - hence the name, GEM. In addition, as a design goal, they have taken care to provide the robustness needed to do the physics that requires high luminosity. Finally, good coverage and hermeticity allow the detection of missing transverse energy, E{sub T}. The GEM design emphasizes clean identification and high resolution measurement of the primary physics signatures for high p{sub T} physics. The approach is to make precise energy measurements that maximize the sensitivity to rare narrow resonances, to detect the elementary interaction products (quarks, leptons, and photons), and to build in the features required to reduce backgrounds.

  18. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Programmation STEP7 niveau 1 : 14-17.9.2004 (4 jours) ANSYS : Thermal Analysis : 22 - 24.9.2004 (3 days) LabVIEW Migration 6 à 7 : 23.9.2004 (one day) ANSYS : Advanced Topics : 27.9 - 1.10.2004 (5 days) Word 2003 - niveau 2 : 27 & 28.9.2004 (2 jours) LabVIEW - Basics 1 : 27 - 29.9.2004 (3 days) MAGNE-04 : Magnétisme pour l'électrotechnique : 28 - 30.9.2004 (3 jours) LabVIEW - Basics 2 : 30.9 & 1.10.2004 (2 days) Introduction à Windows XP au CERN : 4.10.2004 (matin) FrontPage 2003 - niveau 1 : 7 & 8.10.04 (2 jours) Outlook (short course I) : E-mail : 22.10.2004 (2 hours, morning) Outlook (short course II) : Calendar, Tasks and Notes: 22.10.2004 (2 hours, afternoon) Introduction à ANSYS : 23 - 26.11.2004 (4 jours) ENSEIGNEMENT TECHNIQUE TECHNICAL TRAINING Monique Duval 74924...

  19. Waste Management Technical Manual

    Energy Technology Data Exchange (ETDEWEB)

    Buckingham, J.S. [ed.

    1967-08-31

    This Manual has been prepared to provide a documented compendium of the technical bases and general physical features of Isochem Incorporated`s Waste Management Program. The manual is intended to be used as a means of training and as a reference handbook for use by personnel responsible for executing the Waste Management Program. The material in this manual was assembled by members of Isochem`s Chemical Processing Division, Battelle Northwest Laboratory, and Hanford Engineering Services between September 1965 and March 1967. The manual is divided into the following parts: Introduction, contains a summary of the overall Waste Management Program. It is written to provide the reader with a synoptic view and as an aid in understanding the subsequent parts; Feed Material, contains detailed discussion of the type and sources of feed material used in the Waste Management Program, including a chapter on nuclear reactions and the formation of fission products; Waste Fractionization Plant Processing, contains detailed discussions of the processes used in the Waste Fractionization Plant with supporting data and documentation of the technology employed; Waste Fractionization Plant Product and Waste Effluent Handling, contains detailed discussions of the methods of handling the product and waste material generated by the Waste Fractionization Plant; Plant and Equipment, describes the layout of the Waste Management facilities, arrangement of equipment, and individual equipment pieces; Process Control, describes the instruments and analytical methods used for process control; and Safety describes process hazards and the methods used to safeguard against them.

  20. IAEA safeguards technical manual

    International Nuclear Information System (INIS)

    1982-03-01

    Part F of the Safeguards Technical Manual is being issued in three volumes. Volume 1 was published in 1977 and revised slightly in 1979. Volume 1 discusses basic probability concepts, statistical inference, models and measurement errors, estimation of measurement variances, and calibration. These topics of general interest in a number of application areas, are presented with examples drawn from nuclear materials safeguards. The final two chapters in Volume 1 deal with problem areas unique to safeguards: calculating the variance of MUF and of D respectively. Volume 2 continues where Volume 1 left off with a presentation of topics of specific interest to Agency safeguards. These topics include inspection planning from a design and effectiveness evaluation viewpoint, on-facility site inspection activities, variables data analysis as applied to inspection data, preparation of inspection reports with respect to statistical aspects of the inspection, and the distribution of inspection samples to more than one analytical laboratory. Volume 3 covers generally the same material as Volumes 1 and 2 but with much greater unity and cohesiveness. Further, the cook-book style of the previous two volumes has been replaced by one that makes use of equations and formulas as opposed to computational steps, and that also provides the bases for the statistical procedures discussed. Hopefully, this will help minimize the frequency of misapplications of the techniques

  1. Bulletin Survey: Technical clarifications

    CERN Multimedia

    2002-01-01

    In the latest of our articles on the results of the Bulletin survey, we respond to some of your technical comments on the Electronic Bulletin. Many thanks to the more than 500 of you who completed the questionnaire. The full statistics will be published next week. 'It takes too long to download the pages' Yes, it's true that the Electronic Bulletin's download time isn't perfect but it will improve when the Bulletin migrates to another, faster database. 'I find it very difficult to locate all the articles' Some people experience difficulty negotiating their way through the Bulletin once they have entered a specific section. The blue column on the left contains an 'In this issue' link taking you to the other sections. What's more, the whole of the paper Bulletin is available in the electronic version. As the latter is relatively new, however, it will take a bit of time to get used to browsing through it. Many of you say that it's still too early to form an opinion. 'Pull-down menus would be good, so that yo...

  2. Technical Training Seminar

    CERN Multimedia

    2003-01-01

    Thursday 4 September From 14:00 to 17:00 - Training Centre Auditorium bldg. 593, room 11 The Summit Design VisualElite 4.0 Release Jean Marie St Paul / SUMMIT DESIGN, Europe, Technical Manager Michel Delcroix / SUMMIT DESIGN, Southern Europe, Sales F-95015 CERGY PONTOISE, France Summit Design is an important EDA digital hardware design tool supplier, and the industry leader in the emerging Electronic System Level design domain. Its VisualElite program has been used at CERN for several years. This seminar will include the highlights of the program's latest release. It will be illustrated how Summit Design products can provide a high-level C/C++ and SystemC functional modelling design and verification environment, enabling engineers to analyse system concepts before the implementation stage. The seminar will show how mixed SystemC and HDL simulation can be done, along with solutions for hardware/software development. • HDL new features: Connectivity Table Editor. Xemacs full integration. New NCsim ...

  3. Technical Training Seminar

    CERN Multimedia

    2003-01-01

    Thursday 4 September From 14:00 to 17:00 - Training Centre Auditorium bldg. 593, room 11 The Summit Design VisualElite 4.0 Release Jean Marie St Paul / SUMMIT DESIGN, Europe, Technical Manager Michel Delcroix / SUMMIT DESIGN, Southern Europe, Sales F-95015 CERGY PONTOISE, France Summit Design is an important EDA digital hardware design tool supplier, and the industry leader in the emerging Electronic System Level design domain. Its VisualElite program has been used at CERN for several years. This seminar will include the highlights of the program's latest release. It will be illustrated how Summit Design products can provide a high-level C/C++ and SystemC functional modelling design and verification environment, enabling engineers to analyse system concepts before the implementation stage. The seminar will show how mixed SystemC and HDL simulation can be done, along with solutions for hardware/software development. • HDL new features: Connectivity Table Editor. Xemacs full integration. New NCsi...

  4. VLLEEM-2 technical workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    In order to overcome the limits of the energy-environment models, and to benefit at the same time of their past experiences, the VLEEM project proposes a genuine approach and innovative modelling tools to assess the energy-environment systems over the very long term, which are based on the strengths of existing long term energy models, but focussed on two major objectives: to describe normative futures which fit with a set of overall constraints, like the stabilisation of the concentration of green-house gases in the atmosphere, or the stabilisation of the overall inventory of plutonium and minor actinides, etc...; to describe and formalize the association of causalities necessary to bring the system from the present situation to the targeted future, through a '' back-casting '' approach. This first technical workshop presents the state of the art of the different Work Programmes. WP1:Enhancement of the Conceptual framework. WP2: Data base on conventional demand/supply technologies. WP3: Complement and up-date technology monographs. WP4: Formalization and computing of final VLEEM submodels. WP5: Case study 2030, 2050, 2100. (A.L.B.)

  5. Technical approach document

    International Nuclear Information System (INIS)

    1988-04-01

    This document describes the general technical approaches and design criteria adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPS standards. This document is a revision to the original document. Major revisions were made to the sections in riprap selection and sizing, and ground-water; only minor revisions were made to the remainder of the document. The US Nuclear Regulatory Commission (NRC) has prepared a Standard Review Plan (NRC-SRP) which describes factors to be considered by the NRC in approving the RAP. Sections 3.0, 4.0, 5.0, and 7.0 of this document are arranged under the same headings as those used in the NRC-SRP. This approach is adopted in order to facilitate joint use of the documents. Section 2.0 (not included in the NRC-SRP) discusses design considerations; Section 3.0 describes surface-water hydrology and erosion control; Section 4.0 describes geotechnical aspects of pile design; Section 5.0 discusses the Alternate Site Selection Process; Section 6.0 deals with radiological issues (in particular, the design of the radon barrier); Section 7.0 discusses protection of groundwater resources; and Section 8.0 discusses site design criteria for the RAC

  6. AIMES Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Katz, Daniel S [Univ. of Illinois, Urbana-Champaign, IL (United States). National Center for Supercomputing Applications (NCSA); Jha, Shantenu [Rutgers Univ., New Brunswick, NJ (United States); Weissman, Jon [Univ. of Minnesota, Minneapolis, MN (United States); Turilli, Matteo [Rutgers Univ., New Brunswick, NJ (United States)

    2017-01-31

    This is the final technical report for the AIMES project. Many important advances in science and engineering are due to large-scale distributed computing. Notwithstanding this reliance, we are still learning how to design and deploy large-scale production Distributed Computing Infrastructures (DCI). This is evidenced by missing design principles for DCI, and an absence of generally acceptable and usable distributed computing abstractions. The AIMES project was conceived against this backdrop, following on the heels of a comprehensive survey of scientific distributed applications. AIMES laid the foundations to address the tripartite challenge of dynamic resource management, integrating information, and portable and interoperable distributed applications. Four abstractions were defined and implemented: skeleton, resource bundle, pilot, and execution strategy. The four abstractions were implemented into software modules and then aggregated into the AIMES middleware. This middleware successfully integrates information across the application layer (skeletons) and resource layer (Bundles), derives a suitable execution strategy for the given skeleton and enacts its execution by means of pilots on one or more resources, depending on the application requirements, and resource availabilities and capabilities.

  7. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  8. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  9. Non-technical skills in histopathology: definition and discussion.

    Science.gov (United States)

    Johnston, Peter W; Fioratou, Evie; Flin, Rhona

    2011-09-01

    Health care is a high-risk industry, with most documented adverse incidents being associated with 'human factors' including cognitive and social skills termed 'non-technical skills'. Non-technical skills complement the diagnostic and specialist skills and professional attributes required by medical practitioners, including histopathologists, and can enhance the quality of practice and delivery of health-care services and thus contribute to patient safety. This review aims to introduce histopathologists to non-technical skills and how these pertain to everyday histopathological practice. Drawing from other domains in medicine, specifically anaesthesia and surgery, a variety of non-technical skills are identified and described in the context of histopathology to illustrate the role each plays, often collectively, in daily practice. The generic non-technical skills are defined as situation awareness, decision-making, communication, teamwork, leadership, managing stress and coping with fatigue. Example scenarios from histopathology are presented and the contributions to outcomes made by non-technical skills are explained. Consideration of these specific non-technical skills as a component in histopathology training may benefit practitioners as well as assuring patient safety. © 2011 Blackwell Publishing Limited.

  10. Risks of energy sources

    International Nuclear Information System (INIS)

    Pop-Jordanov, J.; Pop-Jordanova, N.

    1989-09-01

    The paper is devoted to comparative health and environmental risks of different energy sources and their influence to public perception, social acceptability and decision-making. The technical heights of the risks, expressed in the number of fatalities of labor and public per unit energy output, from fossil, nuclear and renewable sources are analysed and compared. The complete energy cycle from mining to waste disposal, as well as the future trends, are taken into account. A comparison of the risks of different energy systems with the anticipated global and national energy shares by source is also presented. Furthermore, detailed studies of the non-technical dimensions of the energy risks are performed. Using a modified attitude-behaviour model, the cognitive structure underlying the positions towards different energy options is investigated. Estimating the diverse acting of the risk components, the consequent changes in the rank ordering of the energy sources are deduced. Finally, adding the psychological components nuclear reaches the highest place. In this respect, a unified multidimensional space for the representation of various technological risks is introduced. It affords a comparison of the risks not only by their technical height, but also by other characteristics (involuntary, fearfulness etc.). Finally, it was pointed out that in considering the risk characteristics and constraints, as well as the external fields, a system approach has to be used, taking into account the risks simultaneously with the benefits. 12 refs, 4 figs, 2 tabs

  11. FAIR - Baseline technical report. Executive summary

    International Nuclear Information System (INIS)

    Gutbrod, H.H.; Augustin, I.; Eickhoff, H.; Gross, K.D.; Henning, W.F.; Kraemer, D.; Walter, G.

    2006-09-01

    This document presents the Executive Summary, the first of six volumes comprising the 2006 Baseline Technical Report (BTR) for the international FAIR project (Facility for Antiproton and Ion Research). The BTR provides the technical description, cost, schedule, and assessments of risk for the proposed new facility. The purpose of the BTR is to provide a reliable basis for the construction, commissioning and operation of FAIR. The BTR is one of the central documents requested by the FAIR International Steering Committee (ISC) and its working groups, in order to prepare the legal process and the decisions on the construction and operation of FAIR in an international framework. It provides the technical basis for legal contracts on contributions to be made by, so far, 13 countries within the international FAIR Consortium. The BTR begins with this extended Executive Summary as Volume 1, which is also intended for use as a stand-alone document. The Executive Summary provides brief summaries of the accelerator facilities, the scientific programs and experimental stations, civil construction and safety, and of the workproject structure, costs and schedule. (orig.)

  12. INHERENT VICE & INSUFFICIENT PACKING CLAUSES FOR ALL RISKS INSURANCE POLICIES UNDER BRITISH INSTITUTE CARGO CLAUSES : legal issues arising from claims of loss during sea transportation of large technical equipments

    OpenAIRE

    Cheng, Jia

    2010-01-01

    Analysis and presentation of this thesis is supported by studies of many relevant cases where the major arguments are set around the exclusion clauses concerning the ‘all risks cover’ policy as found in Institute Cargo Clauses. Two cases are especially emphasized, namely Mayban General Assurance BHD v. Alstom Power Plants Ltd. and Global Process Systems Inc v. Syarikat Takaful Malaysia Berhad , mainly because of the special nature of the subject matter insured in these cases. The legal i...

  13. Underground Economics for Vulnerability Risk

    NARCIS (Netherlands)

    Allodi, L.

    The estimation of vulnerability risk is at the core of any IT security management strategy. Among technical and infrastructural metrics of risk, attacker economics represent an emerging new aspect that several risk assessment methodologies propose to consider (e.g., based on game theory). Yet the

  14. Training of technical staff and technical staff managers

    International Nuclear Information System (INIS)

    Moody, G.F.

    1991-01-01

    The purpose of Technical Staff and Technical Staff Managers training is to provide job skills enhancement to individuals selected to fill key technical positions within a nuclear utility. This training is unique in that unlike other training programs accredited by the National Academy for Nuclear Training, it does not lead to specific task qualification. The problems encountered when determining the student population and curriculum are a direct result of this major difference. Major problems encountered are determining who should attend the training, what amount of training is necessary and sufficient, and how to obtain the best feedback in order to effect substantive program improvements. These topics will be explored and possible solutions discussed

  15. Information systems for risk management

    OpenAIRE

    Michael S. Gibson

    1997-01-01

    Risk management information systems are designed to overcome the problem of aggregating data across diverse trading units. The design of an information system depends on the risk measurement methodology that a firm chooses. Inherent in the design of both a risk management information system and a risk measurement methodology is a tradeoff between the accuracy of the resulting measures of risk and the burden of computing them. Technical progress will make this tradeoff more favorable over time...

  16. Danger, hazard, risk

    International Nuclear Information System (INIS)

    Kafka, P.

    1992-01-01

    The real conditions covered by technical safety studies are described better by the term 'risk' instead of such qualitative terms as 'danger' or 'hazard'. 'Risk' incorporates not only the type of damage, the onset of damage, the probability of damage occurring, but also the extent of damage. In reliability and safety engineering, a probabilistic safety analysis is able to describe a plant most comprehensively by these three elements: What can happen? How frequently will it occur? What are the impacts to be taken into account? PSA is meaningful not only when applied to such technical areas in which there is a risk potential; the holistic analytical process optimizes any kind of system and plant in terms of availability and technical safety. (orig.) [de

  17. CTBT technical issues handbook

    International Nuclear Information System (INIS)

    Zucca, J.J.

    1994-05-01

    The purpose of this handbook is to give the nonspecialist in nuclear explosion physics and nuclear test monitoring an introduction to the topic as it pertains to a Comprehensive Test Ban Treaty (CTBT). The authors have tried to make the handbook visually oriented, with figures paired to short discussions. As such, the handbook may be read straight through or in sections. The handbook covers four main areas and ends with a glossary, which includes both scientific terms and acronyms likely to be encountered during CTBT negotiations. The following topics are covered: (1) Physics of nuclear explosion experiments. This is a description of basic nuclear physics and elementary nuclear weapon design. Also discussed are testing practices. (2) Other nuclear experiments. This section discusses experiments that produce small amounts of nuclear energy but differ from explosion experiments discussed in the first chapter. This includes the type of activities, such as laser fusion, that would continue after a CTBT is in force. (3) Monitoring tests in various environments. This section describes the different physical environments in which a test could be conducted (underground, in the atmosphere, in space, underwater, and in the laboratory); the sources of non-nuclear events (such as earthquakes and mining operations); and the opportunities for evasion. (4) On-site inspections. A CTBT is likely to include these inspections as an element of the verification provisions, in order to resolve the nature of ambiguous events. This chapter describes some technical considerations and technologies that are likely to be useful. (5) Selecting verification measures. This chapter discusses the uncertain nature of the evidence from monitoring systems and how compliance judgments could be made, taking the uncertainties into account. It also discusses how to allocate monitoring resources, given the likelihood of testing by various countries in various environments

  18. Technical and economic guidelines

    International Nuclear Information System (INIS)

    1978-01-01

    This paper proposes technical and economic data and analysis for use in comparing the nuclear systems considered in INFCE. It suggests that a relatively detailed set of characteristics be developed for each system. An alternative to this approach is to concentrate on comparing the characteristic of most interest to INFCE, using a differential comparison to established systems (such as the LWR and HWR) where possible. This would avoid the repetitive analysis of design characteristics that are common to many systems. In making the INFCE comparisons it would still be appropriate that a selected set of information, pertinent to the primary assessment factors under consideration, be developed for each nuclear system. This selected set, much more limited than that set forth in the body of this paper, would include overall descriptions of the reactor and fuel cycle facilities, as well as specific information on resource utilization, flow of nuclear materials, and other areas to be determined by the Working Group. On the other hand, in areas such as costs, nuclear safety, and environmental impacts, it would not be intended that information be developed at a level of detail comparable to that resulting from a detailed design of each system being compared. Instead, the detailed set of data identified in this paper can serve as a check list to assure that all pertinent characteristics are considered, at least on a differential basis; more detailed assessments would be needed only where the differences have substantial impact. Thus this paper asks for more detail than will probably be appropriate for many contributed papers

  19. Using Technical Performance Measures

    Science.gov (United States)

    Garrett, Christopher J.; Levack, Daniel J. H.; Rhodes, Russel E.

    2011-01-01

    All programs have requirements. For these requirements to be met, there must be a means of measurement. A Technical Performance Measure (TPM) is defined to produce a measured quantity that can be compared to the requirement. In practice, the TPM is often expressed as a maximum or minimum and a goal. Example TPMs for a rocket program are: vacuum or sea level specific impulse (lsp), weight, reliability (often expressed as a failure rate), schedule, operability (turn-around time), design and development cost, production cost, and operating cost. Program status is evaluated by comparing the TPMs against specified values of the requirements. During the program many design decisions are made and most of them affect some or all of the TPMs. Often, the same design decision changes some TPMs favorably while affecting other TPMs unfavorably. The problem then becomes how to compare the effects of a design decision on different TPMs. How much failure rate is one second of specific impulse worth? How many days of schedule is one pound of weight worth? In other words, how to compare dissimilar quantities in order to trade and manage the TPMs to meet all requirements. One method that has been used successfully and has a mathematical basis is Utility Analysis. Utility Analysis enables quantitative comparison among dissimilar attributes. It uses a mathematical model that maps decision maker preferences over the tradeable range of each attribute. It is capable of modeling both independent and dependent attributes. Utility Analysis is well supported in the literature on Decision Theory. It has been used at Pratt & Whitney Rocketdyne for internal programs and for contracted work such as the J-2X rocket engine program. This paper describes the construction of TPMs and describes Utility Analysis. It then discusses the use of TPMs in design trades and to manage margin during a program using Utility Analysis.

  20. International linear collider. A technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Ned [Argonne National Laboratory, IL (United States); Aderhold, Sebastian [DESY, Hamburg (Germany); Adolphsen, Chris [Stanford Linear Accelerator Center, Menlo Park, CA (United States); and others

    2012-07-01

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R and D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  1. Engineering Technical Review Planning Briefing

    Science.gov (United States)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  2. TECHNICAL CULTURE AND HUMAN AXJOSPHERE

    Directory of Open Access Journals (Sweden)

    ­Krystyna Chałas

    2014-11-01

    Full Text Available Technical culture is the value of each historical period. It is the subject of the ongoing development. While it is a value which is associated with different categories of values, mainly material, cognitive, social. Between culture and these three categories of values ​ there is a cognitive effect. Technical culture determines the quality of human axjosphere. The aim of this study is to show the relationships and dependencies between technical culture and the structures in which a person lives and works. It is mainly about the answer to the question of which values of technical culture are closely related to and what are the inter dependencies? The primary task is to define the concept of the technical culture and to show its teaching essence. The second task boils down to indicate the range of values ​​inherent in the culture of technology, determining the value of the technological culture and values, which are developed by the technical culture. Indication of the interaction between the technical culture and values ​​is the third task.

  3. Field convergence between technical writers and technical translators

    DEFF Research Database (Denmark)

    Gnecchi, M.; Maylath, B.; Mousten, Birthe

    2011-01-01

    As translation of technical documents continues to grow rapidly and translation becomes more automated, the roles of professional communicators and translators appear to be converging. This paper updates preliminary findings first presented at the 2008 International Professional Communication...

  4. LHC Availability 2017: Technical Stop 1 to Technical Stop 2

    CERN Document Server

    Todd, Benjamin; Apollonio, Andrea; Walsh, David John; CERN. Geneva. ATS Department

    2017-01-01

    This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Technical Stop 2 (TS2) in 2017. This period was dedicated to proton physics with a bunch spacing of 25ns. This note has been produced and ratified by the Availability Working Group which has complied fault information for the period in question using the Accelerator Fault Tracker.

  5. ITER technical advisory committee meeting

    International Nuclear Information System (INIS)

    Fujiwara, M.

    1999-01-01

    The ITER Technical Advisory Committee (TAC) meeting took place on December 20-22, 1999 at the Naka Joint Work Site. The objective of this meeting was to review the document 'Technical Basis for ITER-FEAT Outline Design (ODR)' issued by the Director on December 10. It was also aimed at providing the ITER Meeting scheduled for January 19-20, 2000 in Tokyo with a technical assessment of ODR and recommendations for the optimization of the anticipated plasma performance and engineering design, based on the guidelines approved by the Council in June 1998 and recommendations of the last TAC meeting

  6. Combining technical and organisational elements in layer of protection analysis

    NARCIS (Netherlands)

    Boers, M.N.; Gort, J.; Versloot, N.H.A.

    2005-01-01

    Traditionally, in process industry, risks are reduced with technical solutions and organisational measures. The performance of both types of "solutions" depends on many factors and can not easily be compared. Especially the effectiveness of organisational measures such as the use of procedures,

  7. 76 FR 16235 - Corporate Credit Unions, Technical Corrections

    Science.gov (United States)

    2011-03-23

    ... inadvertently included particular investments that did not--when subject to the other credit risk and asset... NATIONAL CREDIT UNION ADMINISTRATION 12 CFR Part 707 RIN 3133-AD58 Corporate Credit Unions, Technical Corrections AGENCY: National Credit Union Administration (NCUA). ACTION: Final rule. SUMMARY: In...

  8. Assessment of major technical hazards in the insurance business

    International Nuclear Information System (INIS)

    Huppmann, H.

    1981-01-01

    Major technical hazards are covered by means of demand premium rates and subjective corrections according to the degree of innovation and different environmental impacts. The insurer compensates remaining risks by compensatory payments or he moderates them at least in their effects. (DG) [de

  9. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bohdan W. Oppenheim; Rudolf Marloth

    2007-10-26

    Executive Summary The document contains Final Technical Report on the Industrial Assessment Center Program at Loyola Marymount University in Los Angeles, covering the contract period of 9/1/2002 to 11/30/2006, under the contract DE-FC36-02GO 12073. The Report describes six required program tasks, as follows: TASK 1 is a summary of the assessments performed over the life of the award: 77 assessments were performed, 595 AR were recommended, covering a very broad range of manufacturing plants. TASK 2 is a description of the efforts to promote and increase the adoption of assessment recommendations and employ innovative methods to assist in accomplishing these goals. The LMU IAC has been very successful in accomplishing the program goals, including implemented savings of $5,141,895 in energy, $10,045,411 in productivity and $30,719 in waste, for a total of $15,218,025. This represents 44% of the recommended savings of $34,896,392. TASK 3 is a description of the efforts promoting the IAC Program and enhancing recruitment efforts for new clients and expanded geographic coverage. LMU IAC has been very successful recruiting new clients covering Southern California. Every year, the intended number of clients was recruited. TASK 4 describes the educational opportunities, training, and other related activities for IAC students. A total of 38 students graduated from the program, including 2-3 graduate students every semester, and the remainder undergraduate students, mostly from the Mechanical Engineering Department. The students received formal weekly training in energy (75%) and productivity (25). All students underwent extensive safety training. All students praised the IAC experience very highly. TASK 5 describes the coordination and integration of the Center activities with other Center and IAC Program activities, and DOE programs. LMU IAC worked closely with MIT, and SDSU IAC and SFSU IAC, and enthusiastically supported the SEN activities. TASK 6 describes other tasks

  10. Innovative technical plasma applications

    International Nuclear Information System (INIS)

    Wintner, E.

    2013-01-01

    Plasma is the predominant status of matter, in stars as well as in interstellar space. In science, it was only recognized rather late as a specific (fourth) state of matter: Sir William Crookes described it in 1879 as “radiant matter”, Irving Langmuir created the name “plasma” in 1928. Technically generated plasma is employed very broadly in modern technology. Some examples are Plasma Displays, Fluorescent Lamps (also the modern Energy Saving Lamps), Corona Discharges (for e.g. Ozone generation, or even engine ignition), arc welding and cutting, reactive ion etching, mass spectroscopy, ion rocket engines and many more. Very early since the development of the laser, it was also employed to generate a plasma (spark) in air or on surfaces. Generally, for this purpose at least ns (“Giant”) pulses have to be used. In more recent times, pico- and femtosecond pulses have allowed to create plasma very easily and effectively. Laser fusion may represent the ultimate application in this direction, based on highly amplified ns pulses for inertial confinement or ps pulses designed as fast igniter. The idea of employing laser pulses for the ignition of engines was attempted for the first time in 1978, although with inadequate tools like the CO2 laser. After a long time of inactivity in this field, about 10 years ago a few institutions like Vienna University of Technology first resumed this approach with the help of modern type solid-state lasers and started systematic investigations around the idea of laser ignition of internal combustion engines. Now, this technique has reached a high degree of maturity; remaining problems lie on the development level and are to be solved soon. Ambitious product development by leading engine producers or ignition equipment suppliers has been started world-wide since several years and, as a result, in one or two years laser ignition will probably be imple-mented into high power gas engines or, somewhat later, high-priced automotive

  11. Who recognises technical standards in TTIP?

    NARCIS (Netherlands)

    Purnhagen, K.

    2018-01-01

    Current political discussions on the relationship of technical standards to the Transatlantic, Trade and Investment Partnership (TTIP) concern the question whether TTIP can provide a transatlantic level playing field for technical standards, and whether this will negatively affect technical

  12. Engineering Technical Support Center (ETSC)

    Science.gov (United States)

    ETSC is EPA’s technical support and resource centers responsible for providing specialized scientific and engineering support to decision-makers in the Agency’s ten regional offices, states, communities, and local businesses.

  13. Hydrogen Storage Technical Team Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    The mission of the Hydrogen Storage Technical Team is to accelerate research and innovation that will lead to commercially viable hydrogen-storage technologies that meet the U.S. DRIVE Partnership goals.

  14. ATR Technical Specification Upgrade Program

    International Nuclear Information System (INIS)

    McCracken, R.T.; Durney, J.L.; Freund, G.A.

    1990-01-01

    The Advanced Test Reactor (ATR) is a 250 MW, uranium-aluminum fueled test reactor which began full power operation in 1969. The initial operation was controlled by an Operating Limits document based on the original Safety Analysis Report. Additional safety bases were later developed to support Technical Specifications which were approved and implemented in 1977. The Technical Specifications which were initially developed with content and format specified in ANSI/ANS--15.1, ''The Development of Technical Specifications for Research Reactors.'' The safety basis documentation and the Technical Specifications have been updated as required to maintain them current with the ATR facility configuration. All revisions have been made with a content, format and style consistent with the original. A major, two-phase program to upgrade the content, format and style is in progress. This paper describes the first phase of this program

  15. Technical challenges for dismantlement verification

    International Nuclear Information System (INIS)

    Olinger, C.T.; Stanbro, W.D.; Johnston, R.G.; Nakhleh, C.W.; Dreicer, J.S.

    1997-01-01

    In preparation for future nuclear arms reduction treaties, including any potential successor treaties to START I and II, the authors have been examining possible methods for bilateral warhead dismantlement verification. Warhead dismantlement verification raises significant challenges in the political, legal, and technical arenas. This discussion will focus on the technical issues raised by warhead arms controls. Technical complications arise from several sources. These will be discussed under the headings of warhead authentication, chain-of-custody, dismantlement verification, non-nuclear component tracking, component monitoring, and irreversibility. The authors will discuss possible technical options to address these challenges as applied to a generic dismantlement and disposition process, in the process identifying limitations and vulnerabilities. They expect that these considerations will play a large role in any future arms reduction effort and, therefore, should be addressed in a timely fashion

  16. Polar source analysis : technical memorandum

    Science.gov (United States)

    2017-09-29

    The following technical memorandum describes the development, testing and analysis of various polar source data sets. The memorandum also includes recommendation for potential inclusion in future releases of AEDT. This memorandum is the final deliver...

  17. NASA Technical Reports Server (NTRS)

    Data.gov (United States)

    National Aeronautics and Space Administration — The NTRS is a valuable resource for researchers, students, educators, and the public to access NASA's current and historical technical literature and engineering...

  18. Bibliography of Technical Reports - 1974,

    Science.gov (United States)

    The bibliography lists all Technical Reports prepared by the Woods Hole Oceanographic Institution in the year 1974. It includes an author index , and also a key relating Reports to ’Contribution Numbers’.

  19. Technical bases for estimating fission product behavior during LWR accidents. Technical report

    International Nuclear Information System (INIS)

    1981-06-01

    The objective of this report is to provide the Nuclear Regulatory Commission and the public with a description of the best technical information currently available for estimating the release of radioactive material during postulated reactor accidents, and to identify where gaps exist in our knowledge. This report focuses on those low probability-high consequence accidents involving severe damage to the reactor core and core meltdown that dominate the risk to the public. Furthermore, in this report particular emphasis is placed on the accident behavior of radioactive iodine, as (1) radioiodine is predicted to be a major contributor to public exposure, (2) current regulatory accident analysis procedures focus on iodine, and (3) several technical issues have been raised recently about the magnitude of iodine release. The generation, transport, and attenuation of aerosols were also investigated in some detail to assess their effect on fission product release estimates and to determine the performance of engineered safety features under accident conditions exceeding their design bases

  20. Technical management courses (before July)

    CERN Multimedia

    2015-01-01

    Please find below the courses in the field of technical management scheduled before July and which have places available.       For more details about a course and to register, please go to the Training Catalogue. If you need a course which is not in the catalogue, please contact your supervisor, your Departmental Training Officer or HR-LD at Technical.Management.Training@cern.ch.

  1. Guam Initial Technical Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

    2011-04-01

    Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

  2. Technical framework for groundwater restoration

    International Nuclear Information System (INIS)

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled ''Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration

  3. Environmental impacts on technical products

    International Nuclear Information System (INIS)

    1991-01-01

    The interaction between an object and its environment is examined by methods of environment simulation. With regard to possible synergisms, technical considerations and holistic thinking are essential. Environmental simulation is mainly concerned with questions of ability to function and the service life of technical products in their environment. The environmental simulation is used to discover cause/effect mechanisms in ageing and weathering processes. Questions of artificial ageing and speeded up time tests play a great part here. (orig.) [de

  4. NetView technical research

    Science.gov (United States)

    1993-01-01

    This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.

  5. Air Risk Information Support Center

    Energy Technology Data Exchange (ETDEWEB)

    Shoaf, C.R.; Guth, D.J. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31

    The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1 ref., 2 figs.

  6. Technical analysis as a tool of market timing

    International Nuclear Information System (INIS)

    Rafferty, J.

    2002-01-01

    Risk management teams carry a high burden because businesses have to compete on a global scale. Timing is everything, once a decision to hedge in the futures has been made. How to determine when it is a good time to buy or sell, and be certain that this information has not already been factored into the price is tricky. There are two schools: fundamental analysis and technical analysis. Statistics and supply and demand data are examined to determine why in fundamental analysis, while technical analysis determines when by interpreting charts. With the help of charts that were displayed, the author examined the price of crude oil in 1990 and 1991 in an attempt to demonstrate technical analysis. Technical analysis is based on mathematics, but it is more art than science. It looks at market patterns that repeat themselves endlessly. Markets almost always enter into a period of consolidation or distribution when they break out. Additional charts displaying the price of crude oil for various periods from 1986 to 1991 were presented and analysed. The author concluded by stating that technical analysis provides visual guidelines to hedgers and traders to assist them in making intelligent forecasts about price and risk. figs

  7. Health condition and residual life of deteriorating technical systems

    Energy Technology Data Exchange (ETDEWEB)

    Reinertsen, Rune

    1998-12-31

    Many offshore installations in the Norwegian Sector of the North Sea approach the end of their useful life. The same is true of many power plants and technical systems in general. This thesis describes the theory and improves the methods for the determination of the health condition and residual life of technical systems. Rather than developing new methods it discusses new ways of using existing statistical methods. The main contributions are: (1) A survey of the literature of diagnosis, prediction and life extension for deteriorating technical systems, (2) A discussion of some consequences of selecting the wrong life model, (3) A description of problems related to the determination of mean residual life of non-repairable technical systems, (4) Presentation of the concept of `technical health` to describe the soundness of a system exposed to failure mechanisms, (5) A model for predicting the technical health and residual life of a corroding system, (6) Recommends requirements and methods for using expert knowledge in safety and reliability analysis, (7) A general inspection strategy for system fault diagnosis by using Shannon entropy, (8) Points out weaknesses and strengths of risk measures used in the offshore industry today. 237 refs., 23 figs., 6 tabs.

  8. Health condition and residual life of deteriorating technical systems

    Energy Technology Data Exchange (ETDEWEB)

    Reinertsen, Rune

    1997-12-31

    Many offshore installations in the Norwegian Sector of the North Sea approach the end of their useful life. The same is true of many power plants and technical systems in general. This thesis describes the theory and improves the methods for the determination of the health condition and residual life of technical systems. Rather than developing new methods it discusses new ways of using existing statistical methods. The main contributions are: (1) A survey of the literature of diagnosis, prediction and life extension for deteriorating technical systems, (2) A discussion of some consequences of selecting the wrong life model, (3) A description of problems related to the determination of mean residual life of non-repairable technical systems, (4) Presentation of the concept of `technical health` to describe the soundness of a system exposed to failure mechanisms, (5) A model for predicting the technical health and residual life of a corroding system, (6) Recommends requirements and methods for using expert knowledge in safety and reliability analysis, (7) A general inspection strategy for system fault diagnosis by using Shannon entropy, (8) Points out weaknesses and strengths of risk measures used in the offshore industry today. 237 refs., 23 figs., 6 tabs.

  9. Reader-Centered Technical Writing

    Science.gov (United States)

    Narayanan, M.

    2012-12-01

    Technical writing is an essential part of professional communication and in recent years it has shifted from a genre-based approach. Formerly, technical writing primarily focused on generating templates of documents and sometimes it was creating or reproducing traditional forms with minor modifications and updates. Now, technical writing looks at the situations surrounding the need to write. This involves deep thinking about the goals and objectives of the project on hand. Furthermore, one observes that it is very important for any participatory process to have the full support of management. This support needs to be well understood and believed by employees. Professional writing may be very persuasive in some cases. When presented in the appropriate context, technical writing can persuade a company to improve work conditions ensuring employee safety and timely production. However, one must recognize that lot of professional writing still continues to make use of reports and instruction manuals. Normally, technical and professional writing addresses four aspects. Objective: The need for generating a given professionally written technical document and the goals the document is expected to achieve and accomplish. Clientele: The clientele who will utilize the technical document. This may include the people in the organization. This may also include "unintended readers." Customers: The population that may be affected by the content of the technical document generated. This includes the stakeholders who will be influenced. Environment: The background in which the document is created. Also, the nature of the situation that warranted the generation of the document. Swiss Psychologist Jean Piaget's view of Learning focuses on three aspects. The author likes to extend Jean Piaget's ideas to students, who are asked to prepare and submit Reader-Centered Technical Writing reports and exercises. Assimilation: Writers may benefit specifically, by assimilating a new object into

  10. Chemical risk evaluation, importance of the risk analysis framework uses: Latin America development restrictions

    International Nuclear Information System (INIS)

    Carrillo, M.

    2013-01-01

    The power point presentation is about reach and results of the risk analysis in Venezuela, chemical dangers in food, human damage, injuries , technologies news in fodd development, toxicity, microbiological risk, technical recommendations

  11. Ideas concerning the risk problem in technology

    International Nuclear Information System (INIS)

    Schneider, K.W.

    1975-01-01

    Scientific and technical development is primarily meant to improve the quality of life and to reduce mortality. The increased risk thus caused for the individual leads to a longer life expectation of man and to the ethical question of choosing the safety of a technical system. One must critically choose between justifiable effort and risk. Experience in reactor engineering (technical systems with hypothetical extreme risks) leads to considerations of the analysis to determine the risk of large chemical plants for inhabited neighbourhoods and attempts to design a conceptive and computer model for a safety analysis which can be of use in decisions regarding new planning. (HP/LH) [de

  12. Ageing management technical information investigations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    In February 2013, there are 50 units of commercial nuclear power plants (NPPs) in Japan. We enter into a period that 20 units of them are operating for more than 30 years. Currently, regulation imposes utilities to conduct ageing technical evaluations of each unit before operation of 30 years from the commissioning, to develop the long term maintenance management policy for next 10 years and to submit to the regulatory authority the policy with the report on ageing management technical evaluation (AMTE) for each NPP. It is necessary for regulatory side to develop technical information bases incorporating latest technical knowledge as operating experiences in domestic and abroad on ageing of the plants necessary to conduct reviews of AMTE for each unit. Based on these standpoints, technical information bases investigations have been conducted from the viewpoints of material degradation of ageing NPPs. In order to develop scientific regulator judgment bases related to ageing management (AM) and long-term operation (LTO), investigations on latest information on ageing management in domestic and abroad are conducted and a set of documents including technical evaluation review manuals necessary to conduct AMTE are prepared. To utilize the results of the investigations for ageing technical evaluation, database including latest information related to AM and LTO are developed, ran and operated. In addition, investigations related to Fugen nuclear plant, under decommissioning plants, investigations on mechanism of stress corrosion cracking (SCC), thermal ageing and preventive technologies for SCC, detection and diagnosis technology for ageing degradation and condition monitoring technology are performed to validate and confirm effectiveness of the technologies. (author)

  13. GAR Global Risk Assessment

    Science.gov (United States)

    Maskrey, Andrew; Safaie, Sahar

    2015-04-01

    Disaster risk management strategies, policies and actions need to be based on evidence of current disaster loss and risk patterns, past trends and future projections, and underlying risk factors. Faced with competing demands for resources, at any level it is only possible to priorities a range of disaster risk management strategies and investments with adequate understanding of realised losses, current and future risk levels and impacts on economic growth and social wellbeing as well as cost and impact of the strategy. The mapping and understanding of the global risk landscape has been greatly enhanced by the latest iteration of the GAR Global Risk Assessment and the objective of this submission is to present the GAR global risk assessment which contributed to Global Assessment Report (GAR) 2015. This initiative which has been led by UNISDR, was conducted by a consortium of technical institutions from around the world and has covered earthquake, cyclone, riverine flood, and tsunami probabilistic risk for all countries of the world. In addition, the risks associated with volcanic ash in the Asia-Pacific region, drought in various countries in sub-Saharan Africa and climate change in a number of countries have been calculated. The presentation will share thee results as well as the experience including the challenges faced in technical elements as well as the process and recommendations for the future of such endeavour.

  14. Risk estimation and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson, R A.D.

    1982-10-01

    Risk assessment involves subjectivity, which makes objective decision making difficult in the nuclear power debate. The author reviews the process and uncertainties of estimating risks as well as the potential for misinterpretation and misuse. Risk data from a variety of aspects cannot be summed because the significance of different risks is not comparable. A method for including political, social, moral, psychological, and economic factors, environmental impacts, catastrophes, and benefits in the evaluation process could involve a broad base of lay and technical consultants, who would explain and argue their evaluation positions. 15 references. (DCK)

  15. Technical Support and Transfer of Geothrmal Technical Knowledge and Information

    Energy Technology Data Exchange (ETDEWEB)

    John W. Lund; Toni" Boyd

    2007-11-14

    The Geo-Heat Center (GHC) staff provided responses to 1442 technical support requests during the contract period (April 1, 2006 to September 30, 2007), which were six quarters under this contract. Our website, consisting of 1900 files, also contributes to our technical assistance activity. Downloaded files were 1,889,323 (3,448 per day) from our website, the total number of users was 1,365,258 (2,491 per day), and the total number of hits were 6,008,500 (10,064 per day). The GHC staff attended 60 workshops, short course and professional meeting and made 29 technical presentations. The staff also prepared and mailed out 2,000 copies of each of five issues of the GHC Quaterly Bulletin which contained 26 articles. We also mailed out approximately 5,000 papers and publications to interested individuals and organizations.

  16. RELEASE OF DRIED RADIOACTIVE WASTE MATERIALS TECHNICAL BASIS DOCUMENT

    International Nuclear Information System (INIS)

    KOZLOWSKI, S.D.

    2007-01-01

    This technical basis document was developed to support RPP-23429, Preliminary Documented Safety Analysis for the Demonstration Bulk Vitrification System (PDSA) and RPP-23479, Preliminary Documented Safety Analysis for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Facility. The main document describes the risk binning process and the technical basis for assigning risk bins to the representative accidents involving the release of dried radioactive waste materials from the Demonstration Bulk Vitrification System (DBVS) and to the associated represented hazardous conditions. Appendices D through F provide the technical basis for assigning risk bins to the representative dried waste release accident and associated represented hazardous conditions for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Packaging Unit (WPU). The risk binning process uses an evaluation of the frequency and consequence of a given representative accident or represented hazardous condition to determine the need for safety structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls. A representative accident or a represented hazardous condition is assigned to a risk bin based on the potential radiological and toxicological consequences to the public and the collocated worker. Note that the risk binning process is not applied to facility workers because credible hazardous conditions with the potential for significant facility worker consequences are considered for safety-significant SSCs and/or TSR-level controls regardless of their estimated frequency. The controls for protection of the facility workers are described in RPP-23429 and RPP-23479. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described below

  17. CEEM Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bowers, John [Univ. of California, Santa Barbara, CA (United States)

    2014-11-26

    concentrating photovoltaic applications thathave substantially higher efficiency than single substrate cells made of elemental semiconductors such as silicon. This task required the development of new cell bonding methods with excellent coupling of both photons and electrons between the sub-cells. To accomplish this, we developed (1) GaInN solar cells with enhanced performance by using quantum-well absorbers and front-surface optical texturing, (2) a hybrid "pillar-array" bond which uses an array of metal pillars for electrical coupling, and (3) a "hybrid moth-eye" optical coating which combines the benefits of nano-imprinted moth-eye coatings and traditional multilayer coatings. The technical effectiveness was assessed by measurement of the photovoltaic efficiency of solar cells made using these techniques; the ultrahigh efficiencies targeted by this work are of compelling economic value for concentrating photovoltaics.

  18. The public and effective risk communication

    NARCIS (Netherlands)

    Frewer, L.J.

    2004-01-01

    Abstract Public perceptions of risk have often been dismissed on the basis of ¿irrationality¿, and have tended to be excluded from policy processes by risk assessors and managers. People¿s responses to different risks are determined by psychological factors. The technical risk estimates

  19. Forecasting Resource as a Method of Increasing the Security of Technical Devices

    Science.gov (United States)

    Cherepanov, Anatoly P.; Lyapustin, Pavel K.

    2017-10-01

    The article shows a method of increasing the safe operation of technical devices at various stages of the life cycle according to the proposed classification parameters of the resource by applying the model of resource prediction. The model takes into account the presence of defects, the rate of corrosion and corrosion resistance of the material, the volume of technical diagnosis, the degree of risk in case of failure or damage of technical devices. The article shows the application of the model resource of the technical device from the manufacture to the end of its service life.

  20. 49 CFR 552.6 - Technical review.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Technical review. 552.6 Section 552.6... § 552.6 Technical review. The appropriate Associate Administrator conducts a technical review of the petition. The technical review may consist of an analysis of the material submitted, together with...

  1. Emergency response technical centre of the IPSN

    International Nuclear Information System (INIS)

    Dallendre, R.

    2000-01-01

    The Institute for Nuclear Safety and Protection (IPSN), the technical support of the French nuclear safety authority, provides the technical support needed for protect the surrounding population from the consequences of radioactive releases. In the event of an accident arising at a nuclear facility, the IPSN would set up an Emergency Response Technical Centre (CTC) at Fontenay-aux-Roses. The IPSN's objectives are: (a) to diagnose the state of the nuclear facility and monitor its development, (b) to prepare prognosis for the evolution of the accident and to give an estimation of the associated consequences according to the situation evolution, (c) to estimate the risk of radioactive releases and the consequences on man and on the environment, mainly on the basis of weather forecasts and on the prognosis. This diagnosis-prognosis approach is build-up with the information on the state of the installation given by: the concerned site via audio-conference system and telescope, the security panels of the nuclear plant via networks. To perform its missions, the CTC, which has to be both safe and secure, uses multiple telecommunication resources to dialogue with partners and also mapping computer systems, data bases and software tools: (a) the SESAME system, which gives, during an accident of a PWR, a calculation method for the diagnosis-prognosis aforesaid, (b) the CONRAD system, which calculates the atmospheric dispersal of radioactive substances and consequences in the environment in the early phase of an accident, (c) the ASTRAL code, which allows to cope with long lasting situations. In order to be operational, the IPSN expert regularly undergo training in emergency situation management and participate in exercises organised by the government authorities. (author)

  2. ITER technical advisory committee meeting

    International Nuclear Information System (INIS)

    Fujiwara, M.

    2001-01-01

    The 17th Meeting of the ITER Technical Advisory Committee (TAC-17) was held on February 19-22, the ITER Garching Work Site in Germany. The objective of the meeting was to review the Draft Final Design Report of ITER-FEAT and assess the ability of the self-consistent overall design both to satisfy the technical objectives previously defined and to meet the cost limitations. TAC-17 was also organized to confirm that the design and critical elements, with emphasis on the key recommendations made at previous TAC meetings, are such as to extend the confidence in starting ITER construction. It was also intended to provide the ITER Council, scheduled to meet on 27 and 28 February in Toronto, with a technical assessment and key recommendations of the above mentioned report

  3. Technical support and emergency centre

    International Nuclear Information System (INIS)

    Bohun, L.; Kapisovsk y, M.

    1997-01-01

    This paper presents technical support and emergency management center which will be on two places: Mochovce NPP Emergency Centre (Technical support center and Support working center) and Reserve Emergency Centre in Levice (Reserve emergency center and Environmental Evaluation Center). The main aims of the emergency management centers are: the management and coordination of all persons and organisations; provision of the all information needed to evaluation of the accident and its mitigation; continuous evaluation of the potential or real radiological consequences; taking measure for an early notification of the governmental bodies and the organizations, warning and protection of the public; and other aims. In the next part the data for technical support and emergency centre are discussed

  4. Recreational technical diving part 1: an introduction to technical diving methods and activities.

    Science.gov (United States)

    Mitchell, Simon J; Doolette, David J

    2013-06-01

    Technical divers use gases other than air and advanced equipment configurations to conduct dives that are deeper and/or longer than typical recreational air dives. The use of oxygen-nitrogen (nitrox) mixes with oxygen fractions higher than air results in longer no-decompression limits for shallow diving, and faster decompression from deeper dives. For depths beyond the air-diving range, technical divers mix helium, a light non-narcotic gas, with nitrogen and oxygen to produce 'trimix'. These blends are tailored to the depth of intended use with a fraction of oxygen calculated to produce an inspired oxygen partial pressure unlikely to cause cerebral oxygen toxicity and a nitrogen fraction calculated to produce a tolerable degree of nitrogen narcosis. A typical deep technical dive will involve the use of trimix at the target depth with changes to gases containing more oxygen and less inert gas during the decompression. Open-circuit scuba may be used to carry and utilise such gases, but this is very wasteful of expensive helium. There is increasing use of closed-circuit 'rebreather' devices. These recycle expired gas and potentially limit gas consumption to a small amount of inert gas to maintain the volume of the breathing circuit during descent and the amount of oxygen metabolised by the diver. This paper reviews the basic approach to planning and execution of dives using these methods to better inform physicians of the physical demands and risks.

  5. Overview of risk assessment

    International Nuclear Information System (INIS)

    Rimington, J.D.

    1992-01-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits

  6. Overview of risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Rimington, J D [Health and Safety Executive (United Kingdom)

    1992-07-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits.

  7. Technical Manual: easyCBM. Technical Report #1408

    Science.gov (United States)

    Anderson, Daniel; Alonzo, Julie; Tindal, Gerald; Farley, Dan; Irvin, P. Shawn; Lai, Cheng-Fei; Saven, Jessica L.; Wray, Kraig A.

    2014-01-01

    Since the easyCBM© learning system was first published in 2006, over $8 million of federal funding (both from the Office of Special Education Programs and more recently from the Institute of Education Sciences) has been used to develop, study, and refine the assessments available on the system. This Technical Manual summarizes the ongoing research…

  8. Management of technical information department

    Energy Technology Data Exchange (ETDEWEB)

    Kim, T H; Han, D H; Moon, H W [and others

    1997-03-01

    This report introduces technical information activities in 1996. They are composed of basic tasks and applied tasks. 1. Basic activities - acquisition, cataloging, and Information services 2. Management of KAERI-TIPS (Technical Information Processing System) 3. Construction of the database for nuclear-related Information 4. Role of Specialized Nuclear Information Center in the field of nuclear energy and cooperation with INIS section of IAEA 5. Beside above activities, in 1996 TID homepage was opened and online document delivery service was provided. (author). 25 tabs., 17 figs.

  9. Management of technical information department

    International Nuclear Information System (INIS)

    Kim, T. H.; Han, D. H.; Moon, H. W.

    1997-03-01

    This report introduces technical information activities in 1996. They are composed of basic tasks and applied tasks. 1. Basic activities - acquisition, cataloging, and Information services 2. Management of KAERI-TIPS (Technical Information Processing System) 3. Construction of the database for nuclear-related Information 4. Role of Specialized Nuclear Information Center in the field of nuclear energy and cooperation with INIS section of IAEA 5. Beside above activities, in 1996 TID homepage was opened and online document delivery service was provided. (author). 25 tabs., 17 figs

  10. Physical foundations of technical acoustics

    CERN Document Server

    Malecki, I

    1969-01-01

    Physical Foundations of Technical Acoustics discusses theoretical foundations of acoustical engineering. It is not so much a technical compendium as a systematic statement of physical laws so conceived that technologists might find in it all the information they need to become acquainted with the physical meaning and mathematical expression of phenomena they encounter in their work. To facilitate the acquirement of notions, which lie beyond a layman's grasp, the plan of narration adopted consists in beginning with the simplest idealized cases and then gradually moving on to the truest possibl

  11. Trojan technical specification verification project

    International Nuclear Information System (INIS)

    Bates, L.; Rickenback, M.

    1991-01-01

    The Trojan Technical Specification Verification (TTSV) project at the Trojan plant of Portland General Electric Company was motivated by the recognition that many numbers in the Trojan technical specifications (TTS) potentially lacked the consideration of instrument- and/or process-related errors. The plant setpoints were known to consider such errors, but many of the values associated with the limiting conditions for operation (LCO) did not. In addition, the existing plant instrument error analyses were based on industry values that do not reflect the Trojan plant-specific experience. The purpose of this project is to ensure that the Trojan plant setpoint and LCO values include plant-specific instrument error

  12. System for technical innovation support

    International Nuclear Information System (INIS)

    2011-08-01

    This book lists field of support system, which includes tax, development work, basic research project, industrial technology, information and communications field, energy field, part and materials field, local industry, the small and medium business such as technical development field, and industry-university collaboration like summary of investment and financing support and guarantee, support of manpower such as brain pool and contact Korea, support of technique like development technology and strategy for patent, support on certification such as company and technical goods, purchase support.

  13. Technical progress and climatic change

    International Nuclear Information System (INIS)

    Ausubel, J.H.

    1995-01-01

    The global warming debate has neglected and thus underestimated the importance of technical change in considering reduction in greenhouse gases and adaptation to climate change. Relevant quantitative cases of long-run technical change during the past 100 years are presented in computing, communications, transport, energy, and agriculture. A noteworthy technological trajectory is that of decarbonization, or decreasing carbon intensity of primary energy. If human societies have not yet reached the end of the history of technology, the cost structure for mitigation and adaptation changes could be cheap. (Author)

  14. Hanford sitewide grounwater remediation - supporting technical information

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1996-05-01

    The Hanford Sitewide Groundwater Remediation Strategy was issued in 1995 to establish overall goals for groundwater remediation on the Hanford Site. This strategy is being refined to provide more detailed justification for remediation of specific plumes and to provide a decision process for long-range planning of remediation activities. Supporting this work is a comprehensive modeling study to predict movement of the major site plumes over the next 200 years to help plan the remediation efforts. The information resulting from these studies will be documented in a revision to the Strategy and the Hanford Site Groundwater Protection Management Plan. To support the modeling work and other studies being performed to refine the strategy, this supporting technical information report has been produced to compile all of the relevant technical information collected to date on the Hanford Site groundwater contaminant plumes. The primary information in the report relates to conceptualization of the source terms and available history of groundwater transport, and description of the contaminant plumes. The primary information in the report relates to conceptualization of the source terms and available history of groundwater transport, description of the contaminant plumes, rate of movement based on the conceptual model and monitoring data, risk assessment, treatability study information, and current approach for plume remediation

  15. Nuclear risk, psychological impact and public attitudes

    International Nuclear Information System (INIS)

    Ghita, Carmen

    1998-01-01

    Research shows that the images of potential nuclear disasters that have been formed in the mind of antinuclear on public are remarkable different from the assessments put forth by many technical experts. In communicating risk, it is important for authorities to add information about risk assessments approach and its inherent scientific uncertainties. Presenting the benefits as well as the risks also can help the audience balance the issues involved in making decisions about technical risk. The paper describes the public perceptions related to nuclear risk and the risk assessment techniques valuable as communication tools. (author)

  16. Study of the technical specifications for the diesels generator of Juragua NPP

    International Nuclear Information System (INIS)

    Vilaragut Llanes, J.J.

    1996-01-01

    The Technical Specifications of a nuclear power plant specify the limits for plant operation from the safety point of view. These operational safety rules were originally defined on the basis of deterministic analysis and engineering judgement. The Probabilistic safety Assessment, constitutes a tool to analyze of the risk effect in the Technical Specifications Rules, and makes possible a relative comparison of the rules from the risk point of view. This paper studies the technical specifications for the diesels generators of Juragua Nuclear Power Plant and for that was used the probabilistic methodology . It is presented the evaluation of the some parameters as surveillance testing, test interval, repairs time, diesel degradation and AOT

  17. How to be an Effective Technical Writer?

    OpenAIRE

    M Solaiman Ali; Dheya Al-Othmany

    2012-01-01

    Abstract--This paper has focused on technical writing as a skill for engineers. It has sought to define technical writing and throw light on the content and technique of writing the various components of successful technical reports (for example, articles, papers, or research reports, such as theses and dissertations). Then, it has highlighted other special features and principles of effective technical writing. The material in this paper is divided into seven major parts. Part 1 (Technical w...

  18. Technical innovation and policy of scientific technique

    International Nuclear Information System (INIS)

    Song, Wi Jin

    2006-04-01

    This book deals with system of innovation and policy of scientific technology : main view point and Topic, technical politics and technical learning, spread of internet and change of structure in information and communications industry, characteristic of technical innovation of software as open source, transfer into national innovation system, change of activity of public scientific technology, theory on technical innovation, evolution of technical innovation policy and participation of civil.

  19. Ideal Based Cyber Security Technical Metrics for Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    W. F. Boyer; M. A. McQueen

    2007-10-01

    Much of the world's critical infrastructure is at risk from attack through electronic networks connected to control systems. Security metrics are important because they provide the basis for management decisions that affect the protection of the infrastructure. A cyber security technical metric is the security relevant output from an explicit mathematical model that makes use of objective measurements of a technical object. A specific set of technical security metrics are proposed for use by the operators of control systems. Our proposed metrics are based on seven security ideals associated with seven corresponding abstract dimensions of security. We have defined at least one metric for each of the seven ideals. Each metric is a measure of how nearly the associated ideal has been achieved. These seven ideals provide a useful structure for further metrics development. A case study shows how the proposed metrics can be applied to an operational control system.

  20. Mixing of incompatible materials in waste tanks technical basis document

    International Nuclear Information System (INIS)

    SANDGREN, K.R.

    2003-01-01

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process, the technical basis for assigning risk bins, and the controls selected for the mixing of incompatible materials representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSCs) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the FR-equency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report

  1. Modern biogeochemistry environmental risk assessment

    CERN Document Server

    Bashkin, Vladimir N

    2006-01-01

    Most books deal mainly with various technical aspects of ERA description and calculationsAims at generalizing the modern ideas of both biogeochemical and environmental risk assessment during recent yearsAims at supplementing the existing books by providing a modern understanding of mechanisms that are responsible for the ecological risk for human beings and ecosystem

  2. DOE FINAL TECHNICAL REPORT RP

    Energy Technology Data Exchange (ETDEWEB)

    RUSS PETERMAN

    2012-01-01

    The City of Georgetown Utility Systems (GUS) patnered with the private sector, the American Public Power Association (APPA) and Southwestern University to design, construct, test and monitor a solar co-generation system directly connected to the GUS electric distribution system. This report consists of the Primary Technical Report and 3 attachments.

  3. Career Satisfaction Following Technical Education

    Science.gov (United States)

    McDonald, Betty Manager

    2011-01-01

    The effect of career and technical education in the Caribbean is an area of intervention research that needs more attention. This present research is the first of its kind within the region. The study benefits from a large sample size (N = 500) conducted among a non-traditional population in the field of career development. This paper reports on…

  4. Standard Technical Specifications, Westinghouse plants

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for Westinghouse Plants and documents the positions of the Nuclear Regulatory Commission based on the Westinghouse Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. This document, Volume 3, contains the Bases for Sections 3.4--3.9 of the improved STS

  5. Career Technical Education Pathways Initiative

    Science.gov (United States)

    California Community Colleges, Chancellor's Office, 2013

    2013-01-01

    California's education system--the largest in the United States--is an essential resource for ensuring strong economic growth in the state. The Career Technical Education Pathways Initiative (referred to as the Initiative in this report), which became law in 2005, brings together community colleges, K-12 school districts, employers, organized…

  6. Technical regulation of nondestructive inspection

    International Nuclear Information System (INIS)

    1995-01-01

    It starts with the explanation of definition of nondestructive inspection and qualifications for a inspection. It lists the technical regulations of nondestructive inspections which are radiographic testing, ultrasonic flaw detecting test, liquid penetrant test, magnetic particle inspection, eddy current test visual inspection and leakage test.

  7. Defense Technical Information Center thesaurus

    Energy Technology Data Exchange (ETDEWEB)

    Dickert, J.H. [ed.] [comp.

    1996-10-01

    This DTIC Thesaurus provides a basic multidisciplinary subject term vocabulary used by DTIC to index and retrieve scientific and technical information from its various data bases and to aid DTIC`s users in their information storage and retrieval operations. It includes an alphabetical posting term display, a hierarchy display, and a Keywork Out of Context (KWOC) display.

  8. Standard Technical Specifications, Westinghouse Plants

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for Westinghouse Plants and documents the positions of the Nuclear Regulatory Commission based on the Westinghouse Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the unproved STS. Volume 3 contains the Bases for Sections 3.4--3.9 of the improved STS which contain information on safety limits, reactivity control systems, power distribution limits, and instrumentation

  9. Hydrogen Delivery Technical Team Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    The mission of the Hydrogen Delivery Technical Team (HDTT) is to enable the development of hydrogen delivery technologies, which will allow for fuel cell competitiveness with gasoline and hybrid technologies by achieving an as-produced, delivered, and dispensed hydrogen cost of $2-$4 per gallon of gasoline equivalent of hydrogen.

  10. Socio-technical security metrics

    NARCIS (Netherlands)

    Gollmann, D.; Herley, C.; Koenig, V.; Pieters, W.; Sasse, M.A.

    2015-01-01

    Report from Dagstuhl seminar 14491. This report documents the program and the outcomes of Dagstuhl Seminar 14491 “Socio-Technical Security Metrics”. In the domain of safety, metrics inform many decisions, from the height of new dikes to the design of nuclear plants. We can state, for example, that

  11. Design mentoring tool : [technical summary].

    Science.gov (United States)

    2011-01-01

    In 2004 a design engineer on-line mentoring tool was developed and implemented The purpose of the tool was to assist senior engineers mentoring new engineers to the INDOT design process and improve their technical competency. This approach saves seni...

  12. Visualizing interdependencies in technical design

    NARCIS (Netherlands)

    Oosterman, B.J.; Gaalman, G.J.C.; Kuijpers, F.P.J.; Riiahuhta, A.; Pulkkinen, A.

    2001-01-01

    The control and understanding of complex design processes is an important issue in practice and theory. Recent research shows that documentation and analysis of technical interactions between design tasks (using Design Structure Matrices) gives a thorough understanding of the underlying complex

  13. Mechanical Engineering Department technical review

    Energy Technology Data Exchange (ETDEWEB)

    Carr, R.B.; Abrahamson, L.; Denney, R.M.; Dubois, B.E (eds.)

    1982-01-01

    Technical achievements and publication abstracts related to research in the following Divisions of Lawrence Livermore Laboratory are reported in this biannual review: Nuclear Fuel Engineering; Nuclear Explosives Engineering; Weapons Engineering; Energy Systems Engineering; Engineering Sciences; Magnetic Fusion Engineering; and Material Fabrication. (LCL)

  14. Technical diagnostics of steam turbines

    International Nuclear Information System (INIS)

    Vlckova, B.; Drahy, J.

    1987-01-01

    This paper deals with practical experience in application of technical diagnostics methods to steam turbines, in particular using pedestal and shaft vibration measurements as well as estimation of bearing metal temperature and ultrasound emission signals. An estimation of effectiveness of the diagnostics methods used is given on the basis of experimental investigations made on a 30-MW turbine. (author)

  15. Reforming Technical and Technological Education.

    Science.gov (United States)

    Wilson, David N.

    1993-01-01

    Review of technical and technological educational reform in Brazil, Canada, Germany, Great Britain, Indonesia, Malaysia, Singapore, and Sweden shows that reform takes time to complete effectively, long-term approaches are needed, and reform is linked to industrial development, regional cooperation, and decentralized decision making. (SK)

  16. TADS: Technical Assistance Development System.

    Science.gov (United States)

    Epting, Rosemary, Ed.

    Described is the Technical Assistance Development System (TADS), a component of the Frank Porter Graham Child Development Center of the University of North Carolina at Chapel Hill which offers support services to preschool demonstration centers for handicapped children in the First Chance Network. Discussed are the four types of services offered:…

  17. Standard Technical Specifications, Westinghouse plants

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for Westinghouse Plants and documents the positions of the Nuclear Regulatory Commission based on the Westinghouse Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. This document, Volume 1, contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.9 of the improved STS

  18. Atmospheric Research 2011 Technical Highlights

    Science.gov (United States)

    2012-01-01

    The 2011 Technical Highlights describes the efforts of all members of Atmospheric Research. Their dedication to advancing Earth Science through conducting research, developing and running models, designing instruments, managing projects, running field campaigns, and numerous other activities, is highlighted in this report.

  19. The Migration of Technical Workers

    DEFF Research Database (Denmark)

    Dahl, Michael S.; Sorenson, Olav

    2010-01-01

    Using panel data on the Danish population, we estimated the revealed preferences of scientists and engineers for the places in which they choose to work. Our results indicate that these technical workers exhibit substantial sensitivity to differences in wages but that they have even stronger...

  20. Fifty years of Technical Cooperation

    International Nuclear Information System (INIS)

    2007-01-01

    The International Atomic Energy Agency (IAEA) was established in Vienna in 1957. The Statute of the IAEA, approved by 81 nations, founded the organization on three pillars: nuclear verification; safety and security; and the transfer of technology. Today, these three pillars still remain at the heart of the organization's work. However, the way in which the IAEA carries out this work, particularly with regard to technology transfer, has changed greatly over the years. When the IAEA opened for business, nuclear science and technology were in their infancy. Many Member States had no nuclear capacity at all. The IAEA's 'technical assistance' programme, as it was then known, was modest. Early projects were small in scale and short lived, focusing mainly on building human capacities and creating institutions and facilities that would support the introduction of nuclear technology in a safe and effective manner. Today, the picture is more complex. Instead of merely offering assistance, the IAEA focuses on cooperation for sustainable socioeconomic development, building on the skills and infrastructure that Member States have acquired over the past five decades. Member States are full partners in the process, guiding the IAEA's technical cooperation activities, setting national and regional priorities, and offering training opportunities and technical support to the IAEA and to other Member States. Technical cooperation between developing countries is facilitated and supported through regional cooperative agreements. Regional centres of expertise play an important role in sharing the benefits of nuclear science and technology among Member States