WorldWideScience

Sample records for plant qualification testing

  1. French nuclear plant safeguard pump qualification testing: EPEC test loop

    International Nuclear Information System (INIS)

    Guesnon, H.

    1985-01-01

    This paper reviews the specifications to which nuclear power plant safeguard pumps must be qualified, and surveys the qualification methods and program used in France to verify operability of the pump assembly and major pump components. The EPEC test loop is described along with loop capabilities and acheivements up to now. This paper shows, through an example, the Medium Pressure Safety Injection Pump designed for service in 1300 MW nuclear power plants, and the interesting possibilities offered by qualification testing

  2. Qualification tests for shift personnel in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Fechner, J B [Bundesministerium des Innern, Bonn (Germany, F.R.)

    1978-02-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors.

  3. Qualification tests for shift personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1978-01-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors. (orig.) [de

  4. 78 FR 25488 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-05-01

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for... regulatory guide (DG), DG-1235, ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants... entitled ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants'' is temporarily...

  5. 78 FR 67206 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-11-08

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Revision to regulatory guide; issuance..., ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants.'' This RG is being revised to provide... Operators Installed Inside the Containment of Nuclear Power Plants,'' dated January 1974. ADDRESSES: Please...

  6. Qualification test of chemical cleaning for secondary side of steam generator in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zhang Mengqin; Zhang Shufeng; Yu Jinghua; Hou Shufeng

    1997-07-01

    The chemical cleaning technique for removing sludge on the secondary side in Qinshan Nuclear Power Plant has been qualified. The chemical cleaning process will carry out during shutdown refuelling. The qualification test has studied the effect of chemical cleaning agent component, cleaning time on dissolution effectiveness of sludge (Fe 3 O 4 ) and to evaluate corrosion situation of main materials of SG in the cleaning process. The main component of cleaning agent is EDTA. The cleaning temperature is 20∼30 degree C. It is determined that allowable remains amount of cleaning agent (EDTA). The technique of cleaning, rinse, passivation for the chemical cleaning in Qinshan Nuclear Power Plant has been made. The qualification test shown that the technique can dissolve Fe 3 O 4 >1 g/L, the corrosion of materials is in allowable value, the allowable remains of EDTA is <0.01%. The technique character is static, ambient temperature. (9 refs., 12 tabs.)

  7. Qualification of nuclear power plant inspection, examination, and testing personnel. Revision 1, September 1980

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, requires that the quality assurance program provide for indoctrination and training of personnel performing activities affecting quality as necessary to ensure that quality assurance personnel achieve and maintain suitable proficiency. This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to qualification of inspection, examination, and testing personnel for all types of nuclear power plants

  8. Qualification test on class 1E charger and inverter in nuclear power plant

    International Nuclear Information System (INIS)

    Li Mingcheng; Lin Jian; Fu Mingxing; Xu Benfu; Ma Peifeng

    2014-01-01

    The qualification approach for class lE electrical equipment was introduced, based on IEC, IEEE and RCC-E standards and technical documents. Combined with a lot of practical experience, the qualification scheme for class lE charger and inverter was developed. The component evaluation, performance and stress test, EMC test, seismic test and software qualification for the equipment were analyzed in detail. (authors)

  9. Test-qualification experience with non-destructive material analysis system performed at Paks Nuclear Power Plant and its usage in non-nuclear fields

    International Nuclear Information System (INIS)

    Somogyi, Gy.; Szabo, D.

    2003-01-01

    The need for qualification of non-destructive material analysis has been recognised in controlling nuclear energy production process. This test-qualification has been performed as first of its kind after the task has been assigned by the National Nuclear Energy Agency. The input documents for the test were. Technical Specification, Analysis Technology, Technical Justification. Test-qualification has been performed with real form control bodies developed by the Rez Nuclear Research Institute, in which the planned defects has been produced by spark-chipping. The qualification procedure has been summarized in a Qualification Folder and given to the national agency to issue a qualification certificate. The procedure might be interesting mostly for companies delivering nuclear power plant assemblies. Similar needs are formulated in standards relative to the qualification of non-nuclear material testing methods (MSZ EN 17025 and EU). (Gy.M.)

  10. A qualification test for relay contacts as isolation devices in nuclear power plants

    International Nuclear Information System (INIS)

    Beck, C.E.; Behera, A.K.; Polanco, S.; Terry, B.

    1995-01-01

    A methodology is introduced for testing the integrity of relay contacts as isolation devices in Class IE circuits. A design activity that installed a new relay established the need for a new type of qualification test. This paper descries the process of establishing the test methodology, the development of the test plan, and the results of testing. It also describes the limitations of applying the results of any specific test to actual field installations, and offers other potential uses of the methodology

  11. Dynamic testing and qualification

    International Nuclear Information System (INIS)

    Kleine Tebbe, A.; Schmidt, G.; Theymann, W.

    1990-01-01

    The core structure of an HTR-plant consists of the side reflector, the bottom reflector, the top reflector and the pebble bed of spherical fuel elements. Dynamically this system is a many-body structure with non-linear force-deformation couplings. The integrity of the system under seismic loads is given by radially orientated spring packs. These spring packs must be stiff against earthquake loads, but must allow radial thermal movements. To verify the seismic safety of the system, scaled-down models were tested. The results of these tests were compared with those of analytical methods. The good-natured behaviour of the pebble-bed under seismic loads has been confirmed. Due to the granular structure of the non-regular packed pebble-bed, high damping occurs during seismic excitations. With increasing depth the damping ratio decreases because of restriction of movement. We are able to describe the seismic behaviour of the pebble-bed analytically. The one- and two-dimensional test configurations of the top reflector were used to analyse resonance and lumping effects. The experimental results were verified by the computer codes CRUNCH-1D AND CRUNCH-2D. The experimental investigations of the side reflector are underway. The results show a non-critical behaviour under horizontal excitations. Small rigid-body motions of single blocks are detected, but they do not cause any global ovalisations of the complete ring structure. Finite element calculations with contact and friction between the blocks show a close agreement with the experimental results. Seismic qualification of ground mounted electrical equipment is usually performed on the basis of codes like IEEE, IEC, KTA, etc. These standards give different possibilities of the excitation mode: sinusoidal excitation in every natural frequency (continuous or sine beat) or time history excitation which covers a prescribed required response spectrum. Recently performed tests are compared regarding the usefulness and severity

  12. Safety review for seismic qualification on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Fang Qingxian

    1995-01-01

    The standards and requirements for seismic qualification of nuclear power plant's component have been fully addressed, including the scope of seismic qualification, the approach and the method of common seismic qualification, the procedure of the seismic tests, and the criteria for the seismic qualification review. The problems discovered in the safety review and the solution for these problems and some other issues are also discussed

  13. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  14. Regulatory Guide 1.131: Qualification tests of electric cables, field splices, and connections for light-water-cooled nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Criterion III, ''Design Control,'' of Appendix B, ''Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plant,'' to 10 CFR Part 50, ''Licensing of Production and Utilization Facilities,'' requires that, where a test program is used to verify the adequacy of a specific design feature, it include suitable qualification testing of a prototype unit under the most adverse design conditions. This regulatory guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to qualification testing of electric cables, field splices, and connections for service in light-water-cooled nuclear power plants to ensure that the cables, field splices, and connections can perform their safety-related functions. The fire test provisions of this guide do not apply to qualification for an installed configuration

  15. Tests of qualification of national components of nuclear power plants under design basis accident

    International Nuclear Information System (INIS)

    Mesquita, A.Z.

    1990-01-01

    With the purpose of qualifying national components of nuclear power plants, whose working must be maintained during and after an accident, the Thermohydraulic Division of CDTN have done tests to check the equipment stability, under Design Basis Accident conditions. Until this moment, the following components were tested: electrical junction boxes (connectors); coating systems for wall, inside cover and steel containment; hydraulics components of personnel and equipment airlock. This work describes the test instalation, the tests performed and its results. The components tested, in a general way, fulfil the specified requirements. (author) [pt

  16. Helicopter-Ship Qualification Testing

    NARCIS (Netherlands)

    Hoencamp, A.

    2015-01-01

    The goal of this research project is to develop a novel test methodology which can be used for optimizing cost and time efficiency of helicopter-ship qualification testing without reducing safety. For this purpose, the so-called “SHOL-X” test methodology has been established, which includes the

  17. Approach to customer qualification of the BNFL Sellafield Mox Plant

    International Nuclear Information System (INIS)

    Sullivan, P.

    2003-01-01

    BNFL started plutonium commissioning of its Sellafield MOX Plant (SMP) in December 2001, with the first MOX pellets being produced in May 2002. SMP was designed to manufacture a range of both PWR and BWR fuel types for a number of different customers. During commissioning and early MOX fuel manufacturing BNFL has been demonstrating its ability to both automatically manufacture and inspect MOX fuel to meet the requirements of different customers' specifications and fuel types. The qualification project consisted of common and project specific qualification. Common qualification was carried out to demonstrate BNFL could meet several customers' requirements during the same qualification test. Project specific qualification was carried out for one customer only as the fabrication or inspection equipment was specific to their fuel type. An example is the fuel assembly process. The reasons for BNFL carrying out common qualification were: - Develop a common qualified process to meet different customer specifications. - Minimise future qualifications prior to starting future fuel campaigns. - Ensure BNFL understands and effectively manages different customer requirements in SMP. BNFL has approached qualification of SMP systematically. Firstly the inspection system was qualified, and once completed the inspection system was then used in the qualification of the manufacturing process. (orig.)

  18. Synthesis of functional materials by radiation and qualification testing of organic materials in nuclear power plant

    International Nuclear Information System (INIS)

    Nho, Young Chang; Kim, Ki Yup; Kang, Phil Hyun and others; Jun, Hong Jae; Suh, Dong Hak; Lee, Young Moo; Min, Byung Kak; Bae, You Han

    2003-05-01

    The radiation crosslinking and grafting can be easily adjusted and is easily reproducible by controlling the radiation dose. These studies aim to develop new biomaterials such as covering for burns and wound, and controlled release of drug. A radiation technology was used to develop PTC materials useful in devices that limit electric fault currents. Radiation-curing of fiber-matrix composites is a promising application. There are a number of advantages to radiation curing of composites, compared with conventional thermal processing. Radiation curing at ambient temperature allows tighter control of part dimensions, and elimination of internal stresses which otherwise occur on cooling and which reduce material strength. These studies involved radiation curing of epoxy resins with various fibers and filler for structural application for aerospace and sport goods. The chain scission is the basis of other radiation treatments aimed at enhancing processing characteristics of polymers. These studies aim to make PTFE powder from PTFE scrap using the radiation degradation which allows incorporation of the material into coatings, inks etc. Low density polyethylene, crosslinked polyethylene, ethylene propylene rubber, and acrylonitrile butadiene rubber as cable insulating, seathing and sealing materials were irradiated for the accelerated ageing tests. Degradation was investigated by measuring dielectric analysis, thermogravimetric analysis, and dynamic mechanical analysis. Dielectric tanδ, storage modulus and loss modulus were increased with irradiation doses. However, decomposition temperature decreased with irradiation doses

  19. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  20. Nuclear power plants. Electrical equipment of the safety system. Qualification

    International Nuclear Information System (INIS)

    2001-01-01

    This International Standard applies to electrical parts of safety systems employed at nuclear power plants, including components and equipment of any interface whose failure could affect unfavourably properties of the safety system. The standard also applies to non-electrical safety-related interfaces. Furthermore, the standard describes the generic process of qualification certification procedures and methods of qualification testing and related documentation. (P.A.)

  1. Qualification tests for a dosimetry system

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The report of qualification tests for personnel dosemeters is detailed. Qualification test for the energy response and the incidence angle is given. The procedure of test is resumed. Different coefficients of conversion used in these tests are given in tables. (N.C.)

  2. Materials qualification for nuclear power plants

    International Nuclear Information System (INIS)

    Braconi, F.

    1987-01-01

    The supply of materials to be used in the fabrication of components submitted to pressure destined to Atucha II nuclear power plant must fulfill the quality assurance requirements in accordance with the international standards. With the aim of promoting the national participation in CNA II, ENACE had the need to adapt these requirements to the national industry conditions and to the availability of official entities' qualification and inspection. As a uniform and normalized assessment for the qualification of materials did not exist in the country, ENACE had to develop a materials suppliers qualification system. This paper presents a suppliers qualification procedure, its application limits and the alternative procedures for the acceptance of individual stock and for the stock materials purchase. (Author)

  3. Qualification tests for PWR control element drive mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Kim, In Yong; Jin, Choon Eon; Choi Suhn [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-01-01

    It is necessary to perform the qualification test for the magnetic jack type CEDM to show the design compatibility because the CEDM is composed of many mechanical and electrical components complicatedly. ABB-CE performed various qualification tests during the development of the System80 CEDM to which Korea Standard Nuclear Plant (KSNP) CEDM referred. The qualification test for the CEDM is classified into the performance test and the dynamic test. The performance test is to verify operability of the CEDM, and the dynamic test is to find dynamic characteristics and to verify the structural integrity if the CEDM for the seismic accidents. Described in this report are the test requirements, the test facilities and the test methods for the performance and the dynamic qualification tests of the PWR magnetic jack type CEDM. The impacts of the design changes in the Korea Next Generation Reactor (KNGR) on the KSNP CEDM were analyzed to present the necessity for the tests. This report also proposes the facilities to perform the tests in KAERI including reasonable schedule for the tests. Attached to this report is the summary of qualification tests of System 80 CEDM performed by ABB-CE. 20 figs., 16 tabs., 21 refs. (Author) .new.

  4. Qualification tests for PWR control element drive mechanism

    International Nuclear Information System (INIS)

    Kim, In Yong; Jin, Choon Eon; Choi Suhn

    1996-01-01

    It is necessary to perform the qualification test for the magnetic jack type CEDM to show the design compatibility because the CEDM is composed of many mechanical and electrical components complicatedly. ABB-CE performed various qualification tests during the development of the System80 CEDM to which Korea Standard Nuclear Plant (KSNP) CEDM referred. The qualification test for the CEDM is classified into the performance test and the dynamic test. The performance test is to verify operability of the CEDM, and the dynamic test is to find dynamic characteristics and to verify the structural integrity if the CEDM for the seismic accidents. Described in this report are the test requirements, the test facilities and the test methods for the performance and the dynamic qualification tests of the PWR magnetic jack type CEDM. The impacts of the design changes in the Korea Next Generation Reactor (KNGR) on the KSNP CEDM were analyzed to present the necessity for the tests. This report also proposes the facilities to perform the tests in KAERI including reasonable schedule for the tests. Attached to this report is the summary of qualification tests of System 80 CEDM performed by ABB-CE. 20 figs., 16 tabs., 21 refs. (Author) .new

  5. Qualification and testing of CT systems

    DEFF Research Database (Denmark)

    Bartscher, Markus; Neuschaefer-Rube, Ulrich; Illemann, Jens

    2018-01-01

    This chapter focuses on system verification and conformance to specifications. System qualification is carried out to ensure that the system and itscomponents achieve the best performance—usually corresponding to the specificationsmade by the manufacturer. Acceptance and reverification testing ar...

  6. Evolution of seismic shock test qualification of equipment

    International Nuclear Information System (INIS)

    Berriaud, C.

    1979-01-01

    From the first nuclear power plants a new industrial problem is appeared: the seismic test qualification of equipment. Nothing was existing in this range. Methods and test experiments were to be studied and perfected in order to obtain safe results. This paper presents the evolution of this question up to now [fr

  7. Test report: Electron-proton spectrometer qualification test unit, qualification test

    Science.gov (United States)

    Vincent, D. L.

    1972-01-01

    Qualification tests of the electron-proton spectrometer test unit are presented. The tests conducted were: (1) functional, (2) thermal/vacuum, (3) electromagnetic interference, (4) acoustic, (5) shock, (6) vibration, and (7) humidity. Results of each type of test are presented in the form of data sheets.

  8. Sustained qualification process for full scope nuclear power plant simulators

    International Nuclear Information System (INIS)

    Pirson, J.; Stubbe, E.; Vanhoenacker, L.

    1994-01-01

    In the past decade, simulator training for all nuclear power plant operators has evolved into a vital requirement. To assure a correct training, the simulator qualification process is an important issue not only for the initial validation but also following major simulator updates, which are necessary during the lifetime of the simulator. In order to avoid degradation of the simulator validated software, the modifications have to be introduced according to a rigorous methodology and a practical requalification process has to be applied. Such methodology has to be enforced at every phase of the simulator construction or updating process from plant data package constitution, over simulator software development to simulator response qualification. The initial qualification and requalification process is based on the 3 levels identified by the ANSI/ANS 3-5 standard for steady-state, operational transients and accident conditions. For the initial certification of the full scope simulators in Belgium, a practical qualification methodology has been applied, which has been adapted into a set of non regression tests for the requalification after major simulator updates. (orig.) (4 refs., 3 figs.)

  9. Applicability of qualification testing of electric cable to life extension

    International Nuclear Information System (INIS)

    Reynolds, A.B.

    1988-01-01

    The methods for qualification testing of electric cable for nuclear power plants followed by U.S. cable manufacturers and endorsed by the U.S. Nuclear Regulatory Commission (NRC) involve irradiation aging at high dose rates at room temperature and accident aging in steam without the pressure of air. Testing is done sequentially. The research data which led to some concerns have been reviewed, and some conclusions regarding these concerns are suggested

  10. Selection, qualification and training of personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This standard provides criteria for the selection, qualification and training of personnel for stationary nuclear power plants. Qualifications, responsibilities, and training of personnel in operating and support organizations appropriate for the safe and efficient operation of nuclear power plants are addressed

  11. Equipment qualification testing methodology research at Sandia Laboratories

    International Nuclear Information System (INIS)

    Jeppesen, D.

    1983-01-01

    The Equipment Qualification Research Testing (EQRT) program is an evolutionary outgrowth of the Qualification Testing Evaluation (QTE) program at Sandia. The primary emphasis of the program has been qualification methodology research. The EQRT program offers to the industry a research-oriented perspective on qualification-related component performance, as well as refinements to component testing standards which are based upon actual component testing research

  12. Photovoltaic Module Qualification Plus Testing

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wohlgemuth, John [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kempe, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bosco, Nick [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hacke, Peter [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jordan, Dirk [National Renewable Energy Lab. (NREL), Golden, CO (United States); Miller, David C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Silverman, Timothy J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Phillips, Nancy [3M Company, Maplewood, MN (United States); Earnest, Thomas [DuPont, Wilmington, DE (United States); Romero, Ralph [Black & Veatch, Overland Park, KS (United States)

    2013-12-01

    This report summarizes a set of test methods that are in the midst of being incorporated into IEC 61215 for certification of a module design or other tests that go beyond certification to establish bankability.

  13. Unresolved Safety Issue A-46 - seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Anderson, N.

    1985-01-01

    Seismic Qualification of Equipment in Operating Plants was designated as an Unresolved Safety Issue (USI) in December, 1980. The USI A-46 program was developed in early 1981 to investigate the adequacy of mechanical and electrical equipment in operating plants to withstand a safe shutdown earthquake. The approach taken was to develop viable, cost effective alternatives to current seismic qualification licensing requirements which could be applied to operating nuclear power plants. The tasks investigated include: (1) identification of seismic sensitive systems and equipment; (2) assessment of adequacy of existing seismic qualification methods; (3) development and assessment of in-situ test procedures to assist in qualification of equipment; (4) seismic qualification of equipment using seismic experience data; and (5) development of methods to generate generic floor response spectra. Progress to date and plans for completion of resolution are reported

  14. Procedure Development and Qualification of the Phased Array Ultrasonic Testing for the Nuclear Power Plant Piping Weld

    International Nuclear Information System (INIS)

    Yoon, Byung Sik; Yang, Seung Han; Kim, Yong Sik; Lee, Hee Jong

    2010-01-01

    The manual ultrasonic examination for the nuclear power plant piping welds has been demonstrated by using KPD(Korean Performance Demonstration) generic procedure. For automated ultrasonic examination, there is no generic procedure and it should be qualified by using applicable automated equipment. Until now, most of qualified procedures used pulse-echo technique and there is no qualified procedure using phased array technique. In this study, data acquisition and analysis software were developed and phased-array transducer and wedge were designed to implement phased array technique for nuclear power plant in-service inspection. The developed procedure are qualified for performance demonstration for the flaw detection, length sizing and depth sizing. The qualified procedure will be applied for the field examination in the nuclear power plant piping weld inspection

  15. Qualification testing and electrical measurement experience: A manufacturer's view

    Science.gov (United States)

    Arnett, J. C.; Cooley, J. E.; Wingert, T. L.

    1983-11-01

    ARCO Solar's experiences as a participant in an industry-utility-government environmental qualification team examining photovoltaic devices are discussed. Included is an assessment of the applicability, completeness and appropriateness of the testing procedures and of the acceptance criteria for megawatt-sized procurements for utilities. Like the stand-alone users, the utility industry is interested in obtaining low costs, but additional concerns exist related to reliability and durability, safety, grounding and overall system criteria including performance prediction (related to output power acceptance testing), power quality and dispatchability. For purposes of this first major purchase of photovoltaic modules and panels by the utility industry, there was a carry-over of the JPL specifications. The need exists for futher development, assessement, and selection of qualification and testing standards and evaluation criteria specifically addressing these additional concerns for utility-connected PV power-plant applications.

  16. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  17. 1E Qualification of Electrical Equipment - Requirement for Safety Nuclear Power Plants

    International Nuclear Information System (INIS)

    Geambasu, C.; Segarceanu, D.; Albu, J.

    2002-01-01

    The paper presents the qualification methods of the safety related equipment according to the safety class 1E. There are presented the qualification principles, procedure and documents, emphasis being laid on the qualification approach by type tests. This approach assumes the equipment test under both normal and accident conditions (design basis events) simulating the operational conditions and covers the largest part of electrical equipment from a nuclear power plant.The safety related equipment is to be qualified is subjected to a sequential test that will be detailed in the paper. (author)

  18. Qualification test and analysis report: solar collectors

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    Test results show that the Owens-Illinois Sunpak/sup TM/ Model SEC 601 air-cooled collector meets the national standards and codes as defined in the Subsystem Performance Specification and Verification Plan of NASA/MSFC Contract NAS8-32259, dated October 28, 1976. The architectural and engineering firm of Smith, Hinchman and Grylls, Detroit, Michigan, acted in the capacity of the independent certification agency. The program calls for the development, fabrication, qualification and delivery of an air-liquid solar collector for solar heating, combined heating and cooling, and/or hot water systems.

  19. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  20. Seismic qualification of equipment

    International Nuclear Information System (INIS)

    Heidebrecht, A.C.; Tso, W.K.

    1983-03-01

    This report describes the results of an investigation into the seismic qualification of equipment located in CANDU nuclear power plants. It is particularly concerned with the evaluation of current seismic qualification requirements, the development of a suitable methodology for the seismic qualification of safety systems, and the evaluation of seismic qualification analysis and testing procedures

  1. Decant pump assembly and controls qualification testing - test report

    Energy Technology Data Exchange (ETDEWEB)

    Staehr, T.W., Westinghouse Hanford

    1996-05-02

    This report summarizes the results of the qualification testing of the supernate decant pump and controls system to be used for in-tank sludge washing in aging waste tank AZ-101. The test was successful and all components are qualified for installation and use in the tank.

  2. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  3. A guide to qualification of electrical equipment for nuclear power plants. Final report, November 1983

    International Nuclear Information System (INIS)

    Marion, A.; Lamken, D.; Harrall, T.; Kasturi, S.; Holzman, P.; Carfagno, S.; Thompson, D.; Boyer, B.; Hanneman, H.; Rule, W.

    1983-09-01

    Equipment qualification demonstrates that nuclear power plant equipment can perform its safety function - that despite age or the adverse conditions of a design basis accident the equipment can work as needed. This report is a guide to the overall process of electrical equipment qualification. It should interest those who design such equipment, those who buy it, or test it, and even those who install and maintain it. (author)

  4. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  5. Hanford Tank Waste Treatment and Immobilization Plant (WTP) Waste Feed Qualification Program Development Approach - 13114

    Energy Technology Data Exchange (ETDEWEB)

    Markillie, Jeffrey R.; Arakali, Aruna V.; Benson, Peter A.; Halverson, Thomas G. [Hanford Tank Waste Treatment and Immobilization Plant Project, Richland, WA 99354 (United States); Adamson, Duane J.; Herman, Connie C.; Peeler, David K. [Savannah River National Laboratory, Aiken, SC 29808 (United States)

    2013-07-01

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a nuclear waste treatment facility being designed and constructed for the U.S. Department of Energy by Bechtel National, Inc. and subcontractor URS Corporation (under contract DE-AC27-01RV14136 [1]) to process and vitrify radioactive waste that is currently stored in underground tanks at the Hanford Site. A wide range of planning is in progress to prepare for safe start-up, commissioning, and operation. The waste feed qualification program is being developed to protect the WTP design, safety basis, and technical basis by assuring acceptance requirements can be met before the transfer of waste. The WTP Project has partnered with Savannah River National Laboratory to develop the waste feed qualification program. The results of waste feed qualification activities will be implemented using a batch processing methodology, and will establish an acceptable range of operator controllable parameters needed to treat the staged waste. Waste feed qualification program development is being implemented in three separate phases. Phase 1 required identification of analytical methods and gaps. This activity has been completed, and provides the foundation for a technically defensible approach for waste feed qualification. Phase 2 of the program development is in progress. The activities in this phase include the closure of analytical methodology gaps identified during Phase 1, design and fabrication of laboratory-scale test apparatus, and determination of the waste feed qualification sample volume. Phase 3 will demonstrate waste feed qualification testing in support of Cold Commissioning. (authors)

  6. Questions of qualification exam for non-destructive testing and materials science - the first level

    International Nuclear Information System (INIS)

    Shaaban, H.I.; Addarwish, J.M.A.

    2013-01-01

    The book contains seven chapters: Questions of qualification for magnetic particles testing method - Questions of qualification for liquids penetrant testing method - Questions of qualification for the visual inspection testing method - Questions of qualification for the ultrasonic testing method - Questions of qualification for the eddy current testing method - Questions of rehabilitation for industrial radiographic testing method - Qualification questions about materials science and manufacturing defects of castings and welding and comparison between non-destructive testing methods.

  7. Technical basis for environmental qualification of computer-based safety systems in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Tanaka, T.J.; Antonescu, C.E.

    1997-01-01

    This paper summarizes the results of research sponsored by the US Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. This research was conducted by the Oak Ridge National Laboratory (ORNL) and Sandia National Laboratories (SNL). ORNL investigated potential failure modes and vulnerabilities of microprocessor-based technologies to environmental stressors, including electromagnetic/radio-frequency interference, temperature, humidity, and smoke exposure. An experimental digital safety channel (EDSC) was constructed for the tests. SNL performed smoke exposure tests on digital components and circuit boards to determine failure mechanisms and the effect of different packaging techniques on smoke susceptibility. These studies are expected to provide recommendations for environmental qualification of digital safety systems by addressing the following: (1) adequacy of the present preferred test methods for qualification of digital I and C systems; (2) preferred standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging in qualification testing for equipment that is to be located in mild environments; and (5) determination of an appropriate approach to address smoke in a qualification program

  8. Environmental qualification testing of TFE valve components

    International Nuclear Information System (INIS)

    Eyvindson, A.; Krasinski, W.; McCutcheon, R.

    1997-01-01

    Valves containing tetrafluoroethylene (TFE) components are being used in many CANDU Nuclear Generating Stations. However, some concerns remain about the performance of TFE after exposure to high levels of radiation. Stations must therefore ensure that such valves perform reliably after being exposed to postulated accident radiation dose levels. The current Ontario Hydro Environmental Qualification [EQ] program specifies much higher postulated radiation exposure than the original design, to account for conditions following a LOCA. Initial assessments indicated that Teflon components would require replacement. Proof of acceptable performance can remove the need for large scale replacement, avoiding a significant cost penalty and preserving benefits due to the superior performance of TFE-based seals. A test program was undertaken at Chalk River Laboratories (CRL) to investigate the performance of three valves after irradiation to 10 Mrad. Such valves are currently used at the Bruce B Nuclear Generating Station. Each contains TFE packing rings; one also has TFE seats. Two of the valves are used in the ECIS recovery system, while the third is used for instrumentation loop isolation or as drain valves. All are exposed to little or no radiation during normal use. Based on the results of the tests, all the valves tested will still meet functional and performance requirements after the TFE components have been exposed to 10 Mrad of irradiation. (author)

  9. Seismic qualification tests of fans of the NPP of Laguna Verde U-1 and U-2

    International Nuclear Information System (INIS)

    Jarvio C, G.; Garcia H, E. E.; Arguelles F, R.; Vela H, A.; Naranjo U, J. L.

    2013-10-01

    This work presents the results of the seismic qualification tests applied to the fans that will be installed in the control panels of the three divisions of the diesel generators of the nuclear power plant (NPP) of Laguna Verde, Unit-1 and Unit-2. This seismic qualification process of the fans was carried out using two specimens that were tested in the seismic table (vibrating) of the Engineering Institute of Universidad Nacional Autonoma de Mexico (UNAM), in accordance with the requirements of the standard IEEE 344-1975, to satisfy the established requirements of seismic qualification in the technical specifications and normative documents required by the nuclear standards, in order to demonstrate its application in the diesel generators Divisions I, II and III of the NPP. The seismic qualification tests were developed on specimens that were retired of the NPP of Laguna Verde recently with a service life of 7.75 years. (Author)

  10. Seismic qualification of equipment in operating nuclear power plants: Unresolved Safety Issue A-46

    International Nuclear Information System (INIS)

    Chang, T.Y.

    1987-02-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform their intended safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants must be reassessed to determine whether requalification is necessary. The objective of technical studies performed under the Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring qualification to the current criteria that are applied to new plants. This report summarizes the work accomplished on USI A-46. In addition, the collection and review of seismic experience data and existing seismic test data are presented. Staff assessment of work accomplished under USI A-46 leads to the conclusion that the use of seismic experience data provides the most reasonable alternative to current qualification criteria. Consideration of seismic qualification by use of experience data was a specific task in USI A-46. Several other A-46 tasks serve to support the use of an experienced data base. The principal technical finding of USI A-46 is that seismic experience data, supplemented by existing seismic test data, applied in accordance with the guidelines developed, can be used to verify the seismic adequacy of mechanical and electrical equipment in operating nuclear plants. Explicit seismic qualification should be required only if seismic experience data or existing test data on similar components cannot be shown to apply

  11. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Hassan, M.; Tanaka, T.J.

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

  12. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Korsah, K.; Wood, R.T. [Oak Ridge National Lab., TN (United States); Hassan, M. [Brookhaven National Lab., Upton, NY (United States); Tanaka, T.J. [Sandia National Labs., Albuquerque, NM (United States)

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants.

  13. Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan

    International Nuclear Information System (INIS)

    Randklev, E.H.

    1993-06-01

    The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented

  14. Training and qualification of nuclear power plant operators (4)

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2009-01-01

    Training center using the simulators, instructor training, training upgrade, deployment of digital control panel and review of training were described with overseas practice. Recently, nuclear power plant on-site simulators were also used for respective operator training. Operator teamwork training, training team performance upgrade, reflection of operating experiences in nuclear power plant accidents, development of training support equipments and management of training records were needed to review and upgrade training and qualification programs. (T. Tanaka)

  15. THYC qualification on Vatican-1 low pressure tests

    International Nuclear Information System (INIS)

    Duval, C.; Guichard, J.

    1991-06-01

    PWR cores or fuel assemblies are components of a nuclear power plant involving single and two-phase flows in rod bundles. The knowledge of the detailed two-phase and three-dimensional flow patterns is necessary to evaluate the singularity (grids) and bypass effects on the Departure from Nucleate Boiling (DNB) in reactor cores during incidental transients. For that purpose, since 1989, the VATICAN experiment has been performed at EDF as a part of the qualification program of the three-dimensional computer code THYC, developed by EDF. The qualification strategy of the THYC software for PWR cores is the following: assuming the theoretical or experimental knowledge of regular and singular pressure drops and grid turbulence sources in single-phase, pressure drop multipliers and relative velocity in two-phase flow, the VATICAN experiment allows to evaluate the diffusion phenomena in two-phase flow. It provides thermalhydraulic measurements on a mock-up of a part of 900 MWe PWR fuel assembly in single and two-phase flows, with power and quality gradients. The first configuration of the mock-up, with simple spacer grids, is studied (VATICAN-1). The specific effects of mixing spacer grids will be compared to these data through a second configuration. The last void fraction measurements, using a γ-ray technique, performed on VATICAN-1 low pressure tests allowed to qualify a set of closure relations, particularly a model of little two-phase diffusion, adapted to two-phase flows at low pressure (5.0MPa). The qualification of subcooled boiling and diffusion models will continue on next VATICAN and other experimental campaigns [fr

  16. Seismic qualification for water chillers of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Chunming

    2005-01-01

    Water chillers are important components of the electric building chilled water system of Nuclear Power Plant. In this article, we describe the seismic qualification methodology. A united method of seismic analysis and experiment testing were applied. Since the seismic classification of the evaporator, condenser and oil separator is 1F, the chillers must satisfy the function criteria. The functional and performance of the control panel were qualified by seismic test. In order to get the seismic time histories of the base of the motor, compressor and control panel, we did time histories analysis for the whole chillers using the seismic acceleration time history of the building floor on which the water chillers was located. Then, these curves were translated into required response spectrum (RRS), which were used by the seismic test of water chillers compressor sets. All passive components, such as evaporator, condenser, oil separator and support, were qualified by seismic stress analysis method. These components were verified to satisfy the standard when they were subjected to the seismic, gravitational, operational pressure and nozzle loads. The Chillers' components were qualified to the specification and the standard. The motor-compressor set and control panel were qualified to the functional and performance criteria. The applied of this methodology qualified the function of the water chillers compressor sets effectively, especially after the aging test. (author)

  17. Mechanical seals qualification procedure of the main pumps of nuclear power plants in France

    International Nuclear Information System (INIS)

    Buchdahl, D.; Martin, R.; Girault, J.M.

    1992-12-01

    Many important pumps in the nuclear power plants are equipped with mechanical seals. The good behaviour and reliability of mechanical seals depend specially on the quality and the stability of an interface of several microns. Peripheral speed reaches 50 m/s and pressure 5 MPa, shaft diameter may be 200 mm. Any failure of the mechanical seals may stop the production of electricity or may compromise nuclear safety. As far back as 1970, EDF has conducted qualification actions for the most important mechanical seals in terms of availability and safety. A qualification of mechanical seals needs three steps: - constructor test (tuning) at normal conditions, -qualification test on test rig at EDF/DER (semi-industrial) at normal, exceptional and incidental conditions lasting about 1500 h, - industrial qualification test in nuclear power station over one year. Several supplying sources are absolutely necessary. Any pump may receive mechanical seals from at least two different suppliers. A compromise had to be found to restrict the suppliers' number down to three. This choice concerned three high technology suppliers. A consistent modification procedure had been developed (references file procedure). For each power plant series, about ten types of mechanical seals are concerned. The selection criteria are the higher loads factors P, Vg or the safety related importance. This expensive approach is useful for EDF, many functional failures have been detected before the serial mechanical seals installation in the power plants. (authors). 1 annexe

  18. Generic test procedure for the qualification of a nuclear emergency generator

    International Nuclear Information System (INIS)

    Simonis, J.C.; Bowman, S.W.

    1985-01-01

    This paper describes the proposed analytical and experimental procedures for the qualification of the standby generators and exciters used in the Emergency Diesel Generator Systems in a nuclear power plant. The components which require qualification are identified through a failure mode analysis of the systems conducted using engineering drawings updated to include all field changes. The qualification of each component includes the margins given in IEEE Std. 323-1974, ''Qualifying Class 1E Equipment for Nuclear Power Generating Stations.'' These margins are combined with the plant specific data to define an enveloping set of environmental parameters. This set of enveloping parameters, plus margin, form the bases for the analysis or test qualification tasks. Proposed qualification of the composite electrical insulation systems used in the generator and exciter on the form or random wound coils is by traceable testing. However, before testing the thermal and radiation degradation data used in the design of the generator and exciter are evaluated to identify if these data are sufficiently traceable to eliminate the need for additional insulation tests. The required tests are guided by applicable standards

  19. Overview of nuclear power plant equipment qualification issues and practices

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report presents a view of and commentary on the current status of equipment qualification (EQ) in nuclear industries of the major western nations. The introductory chapters discuss the concepts of EQ, the elements of EQ process and highlight some of the key issues in EQ. A brief review of industry practices and some of the prevalent industrial standards is presented, followed by an overview of current regulatory positions in the USA, France, Germany and Sweden. A summary and commentary on the latest research findings on issues relating to accident simulation, to aging simulation and some special topics related to EQ, has been contributed by Franklin Research Centre of Philadelphia. The last part of the report deals with equipment qualification in Canada and gives recommendations on EQ for new plants as well as currently operational CANDU nuclear power plants

  20. Non-destructive testing. The current state of standards and qualification and certification for leak testing

    International Nuclear Information System (INIS)

    Tamura, Yoshikazu

    2011-01-01

    Domestic standards of the leak testing are enacted as one of Japan Industrial Standards. The conformity is advanced between these domestic standards and ISO (International Organization for Standardization) standard. ISO9712 (Non-destructive testing-Qualification and certification of personnel) was revised to include the leak testing of qualification and certification in 2005. The preparation working group of qualification and certification for leak testing is planning start aiming at the system in one and a half years. (author)

  1. Shaking table qualification tests of mechanical and electrical components

    International Nuclear Information System (INIS)

    Jurukovski, D.

    1993-01-01

    This presentation covers the experience of the Institute of Earthquake Engineering and Engineering Seismology, Skopje, Republic of Macedonia in seismic qualification of mechanical components by shaking table testing. The characteristics of the biaxial seismic and single component shaking tables used at the Institute are given. Some examples of the experience from performed test for reactor components are included

  2. Qualification Test for Korean Mockups of ITER Blanket First Wall

    International Nuclear Information System (INIS)

    Kim, S. K.; Lee, D. W.; Bae, Y. D.; Hong, B. G.; Jung, H. K.; Jung, Y. I.; Park, J. Y.; Jeong, Y. H.; Choi, B. K.; Kim, B. Y.

    2009-01-01

    ITER First Wall (FW) includes the beryllium armor tiles joined to CuCrZr heat sink with stainless steel cooling tubes. This first wall panels are one of the critical components in the ITER machine with the surface heat flux of 0.5 MW/m 2 or above. So qualification program needs to be performed with the goal to qualify the joining technologies required for the ITER First Wall. Based on the results of tests, the acceptance of the developed joining technologies will be established. The results of this qualification test will affect the final selection of the manufacturers for the ITER First Wall

  3. Seismic qualification method of equipment for nuclear power plant

    International Nuclear Information System (INIS)

    Kim, J.S.; Choi, T.H.; Sulaimana, R.A.

    1995-01-01

    Safety related equipment installed in Korean Nuclear Power Plants are required to perform a safety function during and after a seismic event. To accomplish this safety function, they must be seismically qualified in accordance with the intent and requirements of the USNRC Reg. Guide 1.100 Rev. 02 and IEEE Std. 344-1987. This paper defines and summarizes acceptable criteria and procedures, based on the Korean experience, for seismic qualification of purchased equipment to be installed in a nuclear power plant. As such the paper is intended to be a concise reference by equipment designers, architectural engineering company and plant owners in uniform implementation of commitments to nuclear regulatory agencies such as the USNRC or Korea Institute of Nuclear Safety (KINS) relating to adequacy of seismic Category 1 equipment. Thus, the paper provides the methodologies which can be used for qualifying equipment for safely related service in Nuclear Power Plants in a cost effective manner

  4. Progress on qualification testing methodology study of electric cables

    International Nuclear Information System (INIS)

    Yoshida, K.; Seguchi, T.; Okada, S.; Ito, M.; Kusama, Y.; Yagi, T.; Yoshikawa, M.

    1983-01-01

    Many instrumental, control and power cables are installed in nuclear power plants, and these cables contain a large amount of organic polymers as insulating and jacketing materials. They are exposed to radiation at high dose rate, steam at high temperature and chemical (or water) spray simultaneously when a LOCA occurs. Under such conditions, the polymers tend to lose their original properties. For reactor safety, the cables should be functional even if they are subjected to a loss-of-coolant accident (LOCA) at the end of their intended service life. In Japan, cable manufacturers qualify their cables according to the proposed test standard issued from IEEJ in 1982, but the standard still has many unsolved problems or uncertainties which have been dealt with tentatively through the manufacturer-user's agreement. The objectives of this research are to study the methodologies for qualification testing of electric wires and cables, and to provide the improved technical bases for modification of the standard. Research activities are divided into the Accident (LOCA) Testing Methodology and the Accelerated Aging Methodology

  5. Secondary Waste Cast Stone Waste Form Qualification Testing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Westsik, Joseph H.; Serne, R. Jeffrey

    2012-09-26

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptable for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF

  6. 10 CFR 50.120 - Training and qualification of nuclear power plant personnel.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Training and qualification of nuclear power plant... Training and qualification of nuclear power plant personnel. (a) Applicability. The requirements of this... each holder of a combined license issued under part 52 of this chapter for a nuclear power plant of the...

  7. Impact of power uprate on environmental qualification of equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Raheja, R.D.; Mohiuddin, A.; Alsammarae, A.

    1996-01-01

    Many nuclear power facilities are finding it economically beneficial to increase reactor output, from operating plants, by resorting to power uprates. A power uprate implies that a utility can increase the reactor output, or the megawatts generated, by increasing steam pressure without adding or changing any plant systems. This is perhaps one of the least expensive options for increasing the generating capacity of a power plant. However, a nuclear plant requires a comprehensive review of the plant systems, structures and components to assure their capability to withstand the resulting increased normal and accident plant conditions. A power uprate will typically result in a plant operating at higher than the originally designed environmental conditions. Safety related equipment in nuclear plants is presently qualified to the UFSAR Chapter 15 accident events and the resulting temperatures, pressures, radiation levels etc. These values will increase when the reactor is producing a higher MWe output. Components that are sensitive to the environment must be re-evaluated and assessed to determine their acceptability and operability under the revised environmental conditions. Most safety-related mechanical and electrical equipment will require an assessment from an environmental qualification standpoint. Utilities must perform this task in a systematic, auditable and cost effective manner to optimize their resources and minimize plant costs associated with modifications, replacements or equipment testing. This paper discusses various approaches and provides recommendations to achieve equipment qualification while satisfying the plant's objective of a power uprate

  8. IAEA activities in nuclear power plant personnel training and qualification

    International Nuclear Information System (INIS)

    Mautner-Markhof, F.

    1993-01-01

    Training to achieve and maintain the qualification and competence of nuclear power personnel is essential for safe and economic nuclear power. Technical Cooperation Meeting on Training-Related Activities for Nuclear Power Plant (NPP) Personnel in the countries of Central and Eastern Europe (CEEC) and of the former Soviet Union (FSU) has as its main objective the identification, through information exchange and discussion, of possible Technical Cooperation (TC) projects to assist Member States in meeting NPP personnel training needs and priorities, including the enhancing of training capabilities

  9. Training and qualification of nuclear power plant operators

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2008-01-01

    Based on training experiences of the nuclear power plant operators of pressurized water reactors (PWR) at the Nuclear Power Training Center Ltd. (NTC) in Japan, training programs were reviewed referring to US training programs. A systematic approach is deployed to them, which mainly consist of on-the-job training and the NTC training courses to meet the needs of all operators from beginners to experienced veterans according to their experiences and objectives. The NTC training is conducted using the simulators that simulate the nuclear power plant dynamics through the use of computers. The operators trained at the NTC work in the central control room of every PWR power plant. The NTC also carries out the qualification examinations for the shift managers. (T. Tanaka)

  10. Qualification testing of flat-plate photovoltaic modules

    Science.gov (United States)

    Hoffman, A. R.; Griffith, J. S.; Ross, R. G., Jr.

    1982-01-01

    The placement of photovoltaic modules in various applications, in climates and locations throughout the world, results in different degrees and combinations of environmental and electrical stress. Early detection of module reliability deficiencies via laboratory testing is necessary for achieving long, satisfactory field service. This overview paper describes qualification testing techniques being used in the US Department of Energy's flat-plate terrestrial photovoltaic development program in terms of their significance, rationale for specified levels and durations, and test results.

  11. Qualification of safety-critical software for digital reactor safety system in nuclear power plants

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Park, Gee-Yong; Kim, Jang-Yeol; Lee, Jang-Soo

    2013-01-01

    This paper describes the software qualification activities for the safety-critical software of the digital reactor safety system in nuclear power plants. The main activities of the software qualification processes are the preparation of software planning documentations, verification and validation (V and V) of the software requirements specifications (SRS), software design specifications (SDS) and codes, and the testing of the integrated software and integrated system. Moreover, the software safety analysis and software configuration management are involved in the software qualification processes. The V and V procedure for SRS and SDS contains a technical evaluation, licensing suitability evaluation, inspection and traceability analysis, formal verification, software safety analysis, and an evaluation of the software configuration management. The V and V processes for the code are a traceability analysis, source code inspection, test case and test procedure generation. Testing is the major V and V activity of the software integration and system integration phases. The software safety analysis employs a hazard operability method and software fault tree analysis. The software configuration management in each software life cycle is performed by the use of a nuclear software configuration management tool. Through these activities, we can achieve the functionality, performance, reliability, and safety that are the major V and V objectives of the safety-critical software in nuclear power plants. (author)

  12. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels

    International Nuclear Information System (INIS)

    Elfving, K.

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included

  13. Environmental qualification test of electrical penetration for nuclear power stations

    International Nuclear Information System (INIS)

    Kooziro, Tetsuya; Nakagawa, Akitoshi; Toyoda, Shigeru; Uno, Shunpei

    1979-01-01

    Environmental qualification test was conducted according to IEEE Std. 323-1974 in order to evaluate the safety and reliability of electrical penetration of PWR type nuclear power station. Electrical penetration is the assemblies of electric cables attached to the containment vessel and penetrate through the vessel. Since it is a part of the vessel, it is deemed to be one of the primary safety equipments that are important for the safety and reliability of nuclear power stations. Environmental tests were conducted continuously as to heat cycle, vibration and LOCA with the full size specimens of bushing type, pigtail type and triaxial cable type and at the same time thermal life and irradiation tests were conducted on the insulation materials used, in order to obtain the comprehensive evaluation of their electrical and mechanical characteristics. As the result, they all satisfied the requirements for the circuits for actual use during and after various environmental qualification tests according to IEEE Std. 323. (author)

  14. Design requirements, criteria and methods for seismic qualification of CANDU power plants

    International Nuclear Information System (INIS)

    Singh, N.; Duff, C.G.

    1979-10-01

    This report describes the requirements and criteria for the seismic design and qualification of systems and equipment in CANDU nuclear power plants. Acceptable methods and techniques for seismic qualification of CANDU nuclear power plants to mitigate the effects or the consequences of earthquakes are also described. (auth)

  15. Qualification test of Class 1E equipment based on IEEE323 Std 2003

    International Nuclear Information System (INIS)

    Kim, J. S.; Jung, S. C.; Kim, T. R.

    2004-01-01

    IEEE Standard for Qualifying Class 1E Equipment has been updated to 2003 edition since the issue of IEEE Std 323-1971, 1974, 1983. NRC approved the IEEE Std 323-1974 as Qualification standard of Class 1E Equipment in domestic nuclear power plant. IEEE Std 323-2003 was issued in September of 2003 and utility is waiting the approval of NRC. IEEE Std 323-2003 suggest a new qualification technique which adopts the condition monitoring. Performance of two transient during DBA test is no longer recommended in IEEE Std 323-2003. IEEE323 Std 2003 included a chapter of ''extension of Qualified life'' to make available the life extension of components during plant life extension. For the efficient control of preserving EQ in domestic nuclear power plant, IEEE323 Std 2003 is strongly recommended

  16. Qualification and certification of nondestructive testing personnel. Vol. 1

    Energy Technology Data Exchange (ETDEWEB)

    Aly, E A [Quality Assurance Department, national Center for Nuclear Safety and Radiation Control, Atomic Energy Authority, Cairo, (Egypt)

    1996-03-01

    Nondestructive testing and inspection are functions in achieving the goals of quality and efficiency at an acceptable cost. All quality assurance systems necessitate that engineers, technicians and craftsmen are able to demonstrate that they have the required level of knowledge and skill. This applies particularly to nondestructive testing (NDT) and inspection. The paper presented highlights most important national and international standards and guidelines addressing training, qualification and certification of NDT personnel.

  17. Qualification and certification of nondestructive testing personnel. Vol. 1

    International Nuclear Information System (INIS)

    Aly, E.A.

    1996-01-01

    Nondestructive testing and inspection are functions in achieving the goals of quality and efficiency at an acceptable cost. All quality assurance systems necessitate that engineers, technicians and craftsmen are able to demonstrate that they have the required level of knowledge and skill. This applies particularly to nondestructive testing (NDT) and inspection. The paper presented highlights most important national and international standards and guidelines addressing training, qualification and certification of NDT personnel

  18. Qualification of class 1e equipment: regulation, technological margins and test experience

    International Nuclear Information System (INIS)

    Pasco, Y.; Le Meur, M.; Henry, J.Y.; Droger, J.P.; Morange, E.; Roubault, J.

    1986-10-01

    French regulation requires licensee to qualify electrical equipment important to safety for service in nuclear power plants to ensure that the equipment can perform its safety function under the set of plausible operating conditions. The French regulatory texts entitled Fundamental safety rules have classified safety related electrical equipment in three main categories: k1, k2, k3, according to their location and operating conditions. The definition of a design basis accident test profile must account for margins applied to thermal hydraulic code outputs. Specific safety margins was added to cover uncertainties in qualification test representativity. Up to now, accidental sequence studies have shown the validity of such a qualification test profile. On the other hand, the results from post accident simulation tests have shown that it is useful not only to validate post accident operating life but also to reveal failures initiated during previous tests [fr

  19. Qualification tests and facilities for the ITER superconductors

    International Nuclear Information System (INIS)

    Bruzzone, P.; Wesche, R.; Stepanov, B.; Cau, F.; Bagnasco, M.; Calvi, M.; Herzog, R.; Vogel, M.

    2009-01-01

    All the ITER superconductors are tested as short length samples in the SULTAN test facility at CRPP. Twenty-four TF conductor samples with small layout variations were tested since February 2007 with the aim of verifying the design and qualification of the manufacturers. The sample assembly and the measurement techniques at CRPP are discussed. Starting in 2010, another test facility for ITER conductors, named EDIPO, will be operating at CRPP to share with SULTAN the load of the samples for the acceptance tests during the construction of ITER.

  20. Qualification test for the flexible receiver

    International Nuclear Information System (INIS)

    Keller, C.M.

    1994-01-01

    This document provides the test plan and procedures to certify and design verify the 42 inch and 4--6 inch Flexible Receiver (FR) is a safety class 3 system. Verification of the design will be handled in two parts. The first part will be to show that it meets design requirements set forth by documents and the second part will perform test(s) to verify its operational aspects. To qualify the design of the FR systems for field use this test will demonstrate environmentally safe removal of a Tank Farm pump mock-up from a Tank Farm riser mock-up. Testing will also demonstrate the performance of supporting equipment. The FR and the Secondary Bagging (SB) equipment shall be tested to verify successful operation of the equipment to the following criteria: The FR can be placed on a riser and connections made to the supporting equipment; The FR bag can accept equipment and be successfully sealed; The SB system encases the seal of the primary FR bag; The flexible bag(s) do not tear and maintain integrity during the entire test; The FR control system operates in the fail safe forced sequence mode; The FR control system will operate in the manual override mode (out of sequence operations); The CCTV Video system monitors and records the removal of the test item; The spray wash system operates without leaks and effectively provides coverage; The item being removed can be reinserted to a depth of 8 feet and the bag reinstalled onto the vertical bag supports; and The system prohibits momentary mechanical fluctuations due to the application of system power, including power interruptions

  1. Fiber Laser Component Testing for Space Qualification Protocol Development

    Science.gov (United States)

    Falvey, S.; Buelow, M.; Nelson, B.; Starcher, Y.; Thienel, L.; Rhodes, C.; Tull, Jackson; Drape, T.; Westfall, C.

    A test protocol for the space qualifying of Ytterbium-doped diode-pumped fiber laser (DPFL) components was developed under the Bright Light effort, sponsored by AFRL/VSE. A literature search was performed and summarized in an AMOS 2005 conference paper that formed the building blocks for the development of the test protocol. The test protocol was developed from the experience of the Bright Light team, the information in the literature search, and the results of a study of the Telcordia standards. Based on this protocol developed, test procedures and acceptance criteria for a series of vibration, thermal/vacuum, and radiation exposure tests were developed for selected fiber laser components. Northrop Grumman led the effort in vibration and thermal testing of these components at the Aerospace Engineering Facility on Kirtland Air Force Base, NM. The results of the tests conducted have been evaluated. This paper discusses the vibration and thermal testing that was executed to validate the test protocol. The lessons learned will aid in future assessments and definition of space qualification protocols. Components representative of major items within a Ytterbium-doped diode-pumped fiber laser were selected for testing; including fibers, isolators, combiners, fiber Bragg gratings, and laser diodes. Selection of the components was based on guidelines to test multiple models of typical fiber laser components. A goal of the effort was to test two models (i.e. different manufacturers) of each type of article selected, representing different technologies for the same type of device. The test articles did not include subsystems or systems. These components and parts may not be available commercial-off-the-shelf (COTS), and, in fact, many are custom articles, or newly developed by the manufacturer. The primary goal for this effort is a completed taxonomy that lists all relevant laser components, modules, subsystems, and interfaces, and cites the documentation for space

  2. Procedure of qualification applied to motors driving auxiliaries in fossil fired and nuclear power plants

    International Nuclear Information System (INIS)

    Coperchini, C.; Fises, A.

    1984-01-01

    Twenty year operation have enabled EDF to better understand the factors improving the reliability of powerhouse auxiliary drive induction motors. Progress in the behaviour of such machines are mainly due to analysis and handling of full size test results achieved in the Saint-Denis Motor Test Laboratory. This work led to the printing of recommendations and technical specifications. Service and safety requirements of the nuclear plant new generation lead to examine again the procedures of qualification. The analysis made in this report let appear the justification to maintain the present EDF policy with some necessary adjustments, especially as far as the nuclear safety motors are concerned [fr

  3. Commissioning of qualification of structures, systems and components for seismic and environmental loads of CIRENE nuclear power plant

    International Nuclear Information System (INIS)

    Bianchi, A.; Gatti, F.; Muzzi, F.; Zola, M.; De Pasquali, F.

    1993-01-01

    On behalf of the Italian National Electricity Board (ENEL) concerning the commissioning of qualification of structures, systems and components of CIRENE NPP, ISMES performed a technical surveillance on the documentation concerning the environmental and seismic qualification of the safety related systems and experimental activities (dynamic and static tests) on plant buildings. The aims of the work were: - the evaluation of the qualification carried out (by test, by analysis, by combination of analysis and test) on the equipment and system, compared with the requirements of the ENEL technical specifications and the most recent international regulations; - the experimental determination of modal quantities (frequencies, damping, mode shapes) of the structures and, in the case of reactor building, the complex impedance of the soil for supporting the analytical work. The present paper deals with the criteria, the system and the results concerning the technical surveillance and with the characteristics and the results of the experimental tests

  4. Accreditation of qualification testing organizations: the industry viewpoint

    International Nuclear Information System (INIS)

    Roby, A.

    1983-01-01

    This paper presents the industry viewpoint on the program for the Accreditation of Qualification Testing Organizations, which has been proposed for rulemaking by the Nuclear Regulatory Commission. The IEEE has agreed to establish the program content, and would administer its requirements in accordance with an agreement between the NRC and IEEE of September 30th, 1981. Presented in this paper is the industry perspective, developed and prepared through the AIF, identifying the serious concerns which the accreditation program has raised. Discussed are the disadvantages of the program and those present benefits which would be lost if the program was adopted. The value of greater emphasis on current regulation to improve the qualification process is presented and the paper details areas where the NRC proposals do not provide adequate justification for the accreditation program

  5. Limitations of ''margin'' in qualification tests

    International Nuclear Information System (INIS)

    Clough, R.L.; Gillen, K.T.

    1984-01-01

    We have carried out investigations of polymer radiation degradation behaviors which have brought to light a number of reasons why this concept of margin can break down. First of all, we have found that dose-rate effects vary greatly in magnitude. Thus, based on high dose-rate testing, poor materials with large dose-rate effects may be selected over better materials with small effects. Also, in certain cases, material properties have been found to level out (as with PVC) or reverse trend (as with buna-n) at high doses, so that ''margin'' may be ineffective, misleading, or counterproductive. For Viton, the material properties were found to change in opposite directions at high and low dose rates, making ''margin'' inappropriate. The underlying problem with the concept of ''margin'' is that differences in aging conditions can lead to fundamental differences in degradation mechanisms

  6. Qualification tests for a type B (U) package

    International Nuclear Information System (INIS)

    Vieru, G.

    2004-01-01

    The primary objective for the safety of radioactive materials transport is to protect human health and the environment taking into consideration its potential risks and radiological consequences. Romania as a Member State of the International Atomic Energy Agency has implemented national regulations for the safe transport of radioactive materials (RAM) in accordance with the Agency's recommendations as well as other international specialized organizations. The paper will describe the qualification tests performed for a type B (U) package, intended to be used for the transport of the radioactive sources Am-241 and Cs-137. For this kind of package the tests were performed the first time in Romania and include: the water spray test, the 1.2 m free drop test, the stacking test, the penetration test, the 9m free drop test, the thermal test and the submersion under a head of water of at least 15 m. The test facilities used for performing qualification tests for the type B (U) package as well as experience and conclusions will be also presented

  7. Post-installed concrete anchors in nuclear power plants: Performance and qualification

    International Nuclear Information System (INIS)

    Mahrenholtz, Philipp; Eligehausen, Rolf

    2015-01-01

    Graphical abstract: - Highlights: • Review of qualification and design regulations for anchors in nuclear power plants. • First complete set of nuclear anchor load–displacement data and its evaluation ever. • Demonstration of robust test behavior of a qualified post-installed anchor product. - Abstract: In nuclear power plants (NPPs), post-installed anchors are widely used for structural and non-structural connections to concrete. In many countries, anchor products employed for safety relevant applications have to be approved by the authorities. For the high safety standards in force for NPPs, special requirements have to be met to allow for extreme design situations. This paper presents an experimental test program conducted to evaluate the performance of anchors according to the German Guideline for Anchorages in Nuclear Power Plants and Nuclear Technology Installations (DIBt KKW Leitfaden, 2010). After a brief introduction to anchor behavior and the regulative context, the results of tension and shear tests carried out on undercut anchors are discussed. Robust load capacities and relatively small displacements determined for demanding load and crack cycling tests demonstrated the suitability of anchors qualified according to a state-of-the-art qualification guideline

  8. Seismic qualification of PWR plant auxiliary feedwater systems

    International Nuclear Information System (INIS)

    Lu, S.C.; Tsai, N.C.

    1983-08-01

    The NRC Standard Review Plan specifies that the auxiliary feedwater (AFW) system of a pressurized water reactor (PWR) is a safeguard system that functions in the event of a Safe Shutdown Earthquake (SSE) to remove the decay heat via the steam generator. Only recently licensed PWR plants have an AFW system designed to the current Standard Review Plan specifications. The NRC devised the Multiplant Action Plan C-14 in order to make a survey of the seismic capability of the AFW systems of operating PWR plants. The purpose of this survey is to enable the NRC to make decisions regarding the need of requiring the licensees to upgrade the AFW systems to an SSE level of seismic capability. To implement the first phase of the C-14 plan, the NRC issued a Generic Letter (GL) 81-14 to all operating PWR licensees requesting information on the seismic capability of their AFW systems. This report summarizes Lawrence Livermore National Laboratory's efforts to assist the NRC in evaluating the status of seismic qualification of the AFW systems in 40 PWR plants, by reviewing the licensees' responses to GL 81-14

  9. 'Outside the box thinking': An overview of an environmental qualification test from a test lab perspective

    International Nuclear Information System (INIS)

    Mitton, T.

    2004-01-01

    Most people in the nuclear Environmental Qualification (EQ) business know that the basis for qualification ultimately lies with an equipment's successful operation during and after exposure to a simulated harsh environment. As opposed to focusing specifically on the test results of an Environmental Qualification test program, this paper/presentation will offer a more detailed look at the mechanical, electrical and thermodynamic requirements as well as the project difficulties and solutions of one such project - particularly an extensive, large-scale, non-typical project. (author)

  10. Neutron absorber qualification and acceptance testing from the designer's perspective

    International Nuclear Information System (INIS)

    Bracey, W.; Chiocca, R.

    2004-01-01

    Starting in the mid 1990's, the USNRC began to require less than 100% credit for the 10B present in fixed neutron absorbers spent fuel transport packages. The current practice in the US is to use only 75% of the specified 10B in criticality safety calculations unless extensive acceptance testing demonstrates both the presence of the 10B and uniformity of its distribution. In practice, the NRC has accepted no more than 90% credit for 10B in recent years, while other national competent authorities continue to accept 100%. More recently, with the introduction of new neutron absorber materials, particularly aluminum / boron carbide metal matrix composites, the NRC has also expressed expectations for qualification testing, based in large part on Transnuclear's successful application to use a new composite material in the TN-68 storage / transport cask. The difficulty is that adding more boron than is really necessary to a metal has some negative effects on the material, reducing the ductility and the thermal conductivity, and increasing the cost. Excessive testing requirements can have the undesired effect of keeping superior materials out of spent fuel package designs, without a corresponding justification based on public safety. In European countries and especially in France, 100% credit has been accepted up to now with materials controls specified in the Safety Analysis Report (SAR): Manufacturing process approved by qualification testing Materials manufacturing controlled under a Quality Assurance system. During fabrication, acceptance testing directly on products or on representative samples. Acceptance criteria taking into account a statistical uncertainty corresponding to 3σ. The original and current bases for the reduced 10 B credit, the design requirements for neutron absorber materials, and the experience of Transnuclear and Cogema Logistics with neutron absorber testing are examined. Guidelines for qualification and acceptance testing and process controls

  11. Qualification test for ITER HCCR-TBS mockups with high heat flux test facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Suk-Kwon, E-mail: skkim93@kaeri.re.kr [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Park, Seong Dae; Jin, Hyung Gon; Lee, Eo Hwak; Yoon, Jae-Sung; Lee, Dong Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Cho, Seungyon [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2016-11-01

    Highlights: • The test mockups for ITER HCCR (Helium Cooled Ceramic Reflector) TBS (Test Blanket System) in Korea were designed and fabricated. • A thermo-hydraulic analysis was performed using a high heat flux test facility by using electron beam. • The plan for qualification tests was developed to evaluate the thermo-hydraulic efficiency in accordance with the requirements of the ITER Organization. - Abstract: The test mockups for ITER HCCR (Helium Cooled Ceramic Reflector) TBS (Test Blanket System) in Korea were designed and fabricated, and an integrity and thermo-hydraulic performance test should be completed under the same or similar operation conditions of ITER. The test plan for a thermo-hydraulic analysis was developed by using a high heat flux test facility, called the Korean heat load test facility by using electron beam (KoHLT-EB). This facility is utilized for a qualification test of the plasma facing component (PFC) for the ITER first wall and DEMO divertor, and for the thermo-hydraulic experiments. In this work, KoHLT-EB will be used for the plan of the performance qualification test of the ITER HCCR-TBS mockups. This qualification tests should be performed to evaluate the thermo-hydraulic efficiency in accordance with the requirements of the ITER Organization (IO), which describe the specifications and qualifications of the heat flux test facility and test procedure for ITER PFC.

  12. Seismic functional qualification of active mechanical and electrical components based on shaking table testing

    International Nuclear Information System (INIS)

    Jurukovski, D.

    1999-01-01

    The seismic testing for qualification of one sample of the NPP Kozloduy Control Panel type YKTC was carried out under Research Contract no: 8008/Rl, entitled: 'Seismic Functional Qualification of Active Mechanical and Electrical Components Based on Shaking Table Testing'. The tested specimen was selected by the Kozloduy NPP staff, Section 'TIA-2' (Technical Instrumentation and Automatics), however the seismic input parameters were selected by the NPP Kozloduy staff, Section HTS and SC (Hydro-Technical Systems and Engineering Structures). The applied methodology was developed by the Institute of Earthquake Engineering and Engineering Seismology staff. This report presents all relevant items related to the selected specimen seismic testing for seismic qualification such as: description of the tested specimen, mounting conditions on the shaking table, selection of seismic input parameters and creation of seismic excitations, description of the testing equipment, explanation of the applied methodology, 'on line' and 'off line' monitoring of the tested specimen, functioning capabilities, discussion of the results and their presentation and finally conclusions and recommendations. In this partial project report, two items are presented. The first item presents a review of the existing and used regulations for performing of the seismic and vibratory withstand testing of electro-mechanical equipment. The selection is made based on MEA, IEEE, IEC and former Soviet Union regulations. The second item presents the abstracts of all the tests performed at the Institute of Earthquake Engineering and Engineering Seismology in Skopje. The selected regulations, the experience of the Institute that has been gathered for the last seventeen years and some theoretical and experimental research will be the basis for further investigations for development of a synthesised methodology for seismic qualification of differently categorized equipment for nuclear power plants

  13. Low-level radioactive waste form qualification testing

    Energy Technology Data Exchange (ETDEWEB)

    Sohal, M.S.; Akers, D.W.

    1998-06-01

    This report summarizes activities that have already been completed as well as yet to be performed by the Idaho National Engineering and Environmental Laboratory (INEEL) to develop a plan to quantify the behavior of radioactive low-level waste forms. It briefly describes the status of various tasks, including DOE approval of the proposed work, several regulatory and environmental related documents, tests to qualify the waste form, preliminary schedule, and approximate cost. It is anticipated that INEEL and Brookhaven National Laboratory will perform the majority of the tests. For some tests, services of other testing organizations may be used. It should take approximately nine months to provide the final report on the results of tests on a waste form prepared for qualification. It is anticipated that the overall cost of the waste quantifying service is approximately $150,000. The following tests are planned: compression, thermal cycling, irradiation, biodegradation, leaching, immersion, free-standing liquid tests, and full-scale testing.

  14. Low-level radioactive waste form qualification testing

    International Nuclear Information System (INIS)

    Sohal, M.S.; Akers, D.W.

    1998-06-01

    This report summarizes activities that have already been completed as well as yet to be performed by the Idaho National Engineering and Environmental Laboratory (INEEL) to develop a plan to quantify the behavior of radioactive low-level waste forms. It briefly describes the status of various tasks, including DOE approval of the proposed work, several regulatory and environmental related documents, tests to qualify the waste form, preliminary schedule, and approximate cost. It is anticipated that INEEL and Brookhaven National Laboratory will perform the majority of the tests. For some tests, services of other testing organizations may be used. It should take approximately nine months to provide the final report on the results of tests on a waste form prepared for qualification. It is anticipated that the overall cost of the waste quantifying service is approximately $150,000. The following tests are planned: compression, thermal cycling, irradiation, biodegradation, leaching, immersion, free-standing liquid tests, and full-scale testing

  15. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    International Nuclear Information System (INIS)

    Gunther, W.E.; Higgins, J.C.; Aggarwal, S.K.

    1991-01-01

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance

  16. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    Energy Technology Data Exchange (ETDEWEB)

    Gunther, W.E.; Higgins, J.C. [Brookhaven National Lab., Upton, NY (United States); Aggarwal, S.K. [Nuclear Regulatory Commission, Washington, DC (United States)

    1991-12-31

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance.

  17. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    Energy Technology Data Exchange (ETDEWEB)

    Gunther, W.E.; Higgins, J.C. (Brookhaven National Lab., Upton, NY (United States)); Aggarwal, S.K. (Nuclear Regulatory Commission, Washington, DC (United States))

    1991-01-01

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance.

  18. Qualification test of a main coolant pump for SMART pilot

    International Nuclear Information System (INIS)

    Park, Sang Jin; Yoon, Eui Soo; Oh, Hyong Woo

    2006-01-01

    SMART Pilot is a multipurpose small capacity integral type reactor. Main Coolant Pump (MCP) of SMART Pilot is a canned-motor-type axial pump to circulate the primary coolant between nuclear fuel and steam generator in the primary system. The reactor is designed to operate under condition of 310 .deg. C and 14.7 MPa. Thus MCP has to be tested under same operating condition as reactor design condition to verify its performance and safety. In present work, a test apparatus to simulate real operating situations of the reactor has been designed and constructed to test MCP. And then functional tests, performance tests, and endurance tests have been carried out upon a prototype MCP. Canned motor characteristics, homologous head/torque curves, coast-down curves, NPSH curves and life-time performance variations were obtained from the qualification test as well as hydraulic performance characteristics of MCP

  19. Training for the qualification and competence of nuclear power plant personnel. Working material

    International Nuclear Information System (INIS)

    1993-01-01

    This document contains summaries of the presentations prepared for the IAEA Review Meeting ''Training for the Qualification and Competence of Nuclear Power Plant Personnel''. The individual contributors have been indexed separately for the database. Refs, figs and tabs

  20. Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 4. Use of fragility in seismic design of nuclear plant equipment. Volume 4

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-08-01

    The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which have covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 4 presents study of the use of fragility concepts in the design of nuclear plant equipment and compares the results of state-of-the-art proof testing with fragility testing

  1. Qualification and authorization of staff carrying out non-destructive testing in Electricite de France

    International Nuclear Information System (INIS)

    Sermadiras, P.; Lhermitte, R.; Boulet, J.

    1985-01-01

    The surveillance carried out by the Group des laboratoires of the Service de la Production thermique on components submitted to Quality Assurance in nuclear power plants of all types requires the use for non-destructive testing of staff who have been given authorization for their particular services. These authorizations are for activities specific to Electricite de France. In the first part, the authors describe the staff of the Groupe des Laboratoires and show how the different levels of authorization (4 levels) are given, taking into account staff qualifications. In the second part, the procedures for qualification and authorization of the staff of outside companies working with and on behalf of the Groupe des Laboratoires are described

  2. Financial qualifications review of applicants for nuclear power plant construction permits

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; Mullen, M.F.; Carr, D.B.

    1988-09-01

    The NRC and its predecessor the AEC have had a regulatory requirement since 1956 that utilities seeking a construction permit for a nuclear power plant be financially qualified to construct and operate the plant. Several amendments to the requirements were made over the years including an attempt in 1982 to drop financial qualification review for electric utilities. This attempt was subsequently found invalid by a federal court. Nevertheless, financial qualification reviews consume significant amounts of NRC staff time and time at Atomic Safety and Licensing Board hearings. The analysis reported in this study was conducted to determine whether there is any empirical evidence of a relationship between a utility's financial health at the time of its construction permits application and the subsequent safety performance of the operating plant. The principal financial measures used to test for this relationship were bond rating, interest coverage ratio, debt/asset ratio, debt/equity ratio, and rate of return on equity. The principal safety measure was the long-term average of the scores assigned the utility in four key areas by the NRC under the Systematic Assessment of Licensee Performance program. The results of the analysis showed no evidence of a relationship between financial health at the time of the construction permit and subsequent safety performance. 7 refs., 16 figs., 4 tabs

  3. Qualification of electronic components for use in nuclear power plants

    International Nuclear Information System (INIS)

    Zorrilla, J.; Antonaccio, E; Luraschi, C.; Rodriguez, F.; Ranalli, J.; Ponce, M.; Dotro, R.; Guinda, J.

    2013-01-01

    There are a large number of instrument subjected to different service condition in a NPP. For instance different instruments can be found working in environment where the dose rate goes from negligible levels up to very harsh radiation levels. When technical specification and or equipment purchasing should be carried out it is possible to find the total leak of qualified instrument. In this context there is a need of dedicated qualification. In this work two different radiation resistance for two different I&C equipment/component were studies. The first I&C equipment was an LVDT (liner variable differential transformer). This equipment was tested while it was actuated in a strong gamma field in order to evaluate possible electromagnetic interferences a number of cycles equivalent to one year of service. After that the component was subjected to accelerated radiation aging and then actuated test under gamma field were carried out. The second I&C component to be tested was an (author)

  4. Development Of A Macro-Batch Qualification Strategy For The Hanford Tank Waste Treatment And Immobilization Plant

    International Nuclear Information System (INIS)

    Herman, Connie C.

    2013-01-01

    The Savannah River National Laboratory (SRNL) has evaluated the existing waste feed qualification strategy for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) based on experience from the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) waste qualification program. The current waste qualification programs for each of the sites are discussed in the report to provide a baseline for comparison. Recommendations on strategies are then provided that could be implemented at Hanford based on the successful Macrobatch qualification strategy utilized at SRS to reduce the risk of processing upsets or the production of a staged waste campaign that does not meet the processing requirements of the WTP. Considerations included the baseline WTP process, as well as options involving Direct High Level Waste (HLW) and Low Activity Waste (LAW) processing, and the potential use of a Tank Waste Characterization and Staging Facility (TWCSF). The main objectives of the Hanford waste feed qualification program are to demonstrate compliance with the Waste Acceptance Criteria (WAC), determine waste processability, and demonstrate unit operations at a laboratory scale. Risks to acceptability and successful implementation of this program, as compared to the DWPF Macro-Batch qualification strategy, include: Limitations of mixing/blending capability of the Hanford Tank Farm; The complexity of unit operations (i.e., multiple chemical and mechanical separations processes) involved in the WTP pretreatment qualification process; The need to account for effects of blending of LAW and HLW streams, as well as a recycle stream, within the PT unit operations; and The reliance on only a single set of unit operations demonstrations with the radioactive qualification sample. This later limitation is further complicated because of the 180-day completion requirement for all of the necessary waste feed qualification steps. The primary recommendations/changes include the

  5. On the evolution of the regulatory guidance for seismic qualification of electric and active mechanical equipment for nuclear power plants

    International Nuclear Information System (INIS)

    Ng, Ching Hang; Chen, Pei-Ying

    2009-01-01

    All electric and active mechanical equipment important to safety for nuclear power plants must be seismically qualified by testing, analysis, or combined analysis and testing. The general requirements for seismic qualification of electric and active mechanical equipment in nuclear power plants are delineated in Appendix S, 'Earthquake Engineering Criteria for Nuclear Power Plants,' to Title 10, Part 50, 'Domestic Licensing of Production and Utilization Facilities,' of the Code of Federal Regulations (10 CFR Part 50), item 52.47(20) of 10 CFR 52.47, 'Contents of Applications; Technical Information,' and Appendix A, 'Seismic and Geologic Siting Criteria for Nuclear Power Plants,' to 10 CFR Part 100, 'Reactor Site Criteria.' The United States Nuclear Regulatory Commission (NRC) issued Revision 2 of Regulatory Guide (RG) 1.100, 'Seismic Qualification of Electric and Mechanical for Nuclear Power Plants' in 1988, which endorsed, with restrictions, exceptions, and clarifications, Institute of Electrical and Electronics Engineers (IEEE) Standard 344-1987 'IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations,' for use in seismic qualification of both electric and mechanical equipment. In 2008, the staff at the NRC drafted Revision 3 of RG 1.100 to endorse, with restrictions, exceptions, and clarifications, the IEEE Std 344-2004 and the American Society of Mechanical Engineers (ASME) QME-1-2007 'Qualification of Active Mechanical Equipment Used in Nuclear Power Plants.' IEEE Std 344-2004 was an update of Std 344-1987 and ASME QME-1-2007 was an update of QME-1-2002. The major changes in IEEE Std 344-2004 and ASME QME-1-2007 include the update and expansion of criteria and procedures describing the use of experience data as a method for seismic qualification of Class 1E electric equipment (including I and C components) as well as active mechanical equipment. In this paper, the staff will compare the draft Revision 3 to

  6. The qualification requirements for personnel carry out the testing for the pressure equipment materials

    International Nuclear Information System (INIS)

    Wojas, M.; Walczak, M.

    2006-01-01

    The article contains information about qualification requirements for personnel carry out the destructive and non-destructive testing for the pressure equipment materials based on the Directive 97/23/CE(PED). Competence laboratory carry out the testing. The responsibility lies with producer / employer. The producer / employer could elaborate the written practice procedure for qualification and certification testing personnel. (authors)

  7. Qualification of electric equipments for nuclear power plants

    International Nuclear Information System (INIS)

    Chauvin, G.; Raimondo, E.

    1983-03-01

    Description of the testing equipment, testing methods and standards of the resistance to seisms of electrical equipments (switches, pump motors, electrovalves, ...) for electronuclear power plants in France. Presentation of the French design and construction rules for electrical devices in the domestic and export nuclear market (resistance to thermodynamical and chemical stresses, to seisms, etc...) [fr

  8. Qualification Tests of Micro-camera Modules for Space Applications

    Science.gov (United States)

    Kimura, Shinichi; Miyasaka, Akira

    Visual capability is very important for space-based activities, for which small, low-cost space cameras are desired. Although cameras for terrestrial applications are continually being improved, little progress has been made on cameras used in space, which must be extremely robust to withstand harsh environments. This study focuses on commercial off-the-shelf (COTS) CMOS digital cameras because they are very small and are based on an established mass-market technology. Radiation and ultrahigh-vacuum tests were conducted on a small COTS camera that weighs less than 100 mg (including optics). This paper presents the results of the qualification tests for COTS cameras and for a small, low-cost COTS-based space camera.

  9. EDS V25 containment vessel explosive qualification test report.

    Energy Technology Data Exchange (ETDEWEB)

    Rudolphi, John Joseph

    2012-04-01

    The V25 containment vessel was procured by the Project Manager, Non-Stockpile Chemical Materiel (PMNSCM) as a replacement vessel for use on the P2 Explosive Destruction Systems. It is the first EDS vessel to be fabricated under Code Case 2564 of the ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel based on the Code Case is nine (9) pounds TNT-equivalent for up to 637 detonations. This limit is an increase from the 4.8 pounds TNT-equivalency rating for previous vessels. This report describes the explosive qualification tests that were performed in the vessel as part of the process for qualifying the vessel for explosive use. The tests consisted of a 11.25 pound TNT equivalent bare charge detonation followed by a 9 pound TNT equivalent detonation.

  10. Application of Microprocessor-Based Equipment in Nuclear Power Plants - Technical Basis for a Qualification Methodology

    International Nuclear Information System (INIS)

    Korsah, K.

    2001-01-01

    This document (1) summarizes the most significant findings of the ''Qualification of Advanced Instrumentation and Control (I and C) Systems'' program initiated by the Nuclear Regulatory Commission (NRC); (2) documents a comparative analysis of U.S. and European qualification standards; and (3) provides recommendations for enhancing regulatory guidance for environmental qualification of microprocessor-based safety-related systems. Safety-related I and C system upgrades of present-day nuclear power plants, as well as I and C systems of Advanced Light-Water Reactors (ALWRs), are expected to make increasing use of microprocessor-based technology. The Nuclear Regulatory Commission (NRC) recognized that the use of such technology may pose environmental qualification challenges different from current, analog-based I and C systems. Hence, it initiated the ''Qualification of Advanced Instrumentation and Control Systems'' program. The objectives of this confirmatory research project are to (1) identify any unique environmental-stress-related failure modes posed by digital technologies and their potential impact on the safety systems and (2) develop the technical basis for regulatory guidance using these findings. Previous findings from this study have been documented in several technical reports. This final report in the series documents a comparative analysis of two environmental qualification standards--Institute of Electrical and Electronics Engineers (IEEE) Std 323-1983 and International Electrotechnical Commission (IEC) 60780 (1998)--and provides recommendations for environmental qualification of microprocessor-based systems based on this analysis as well as on the findings documented in the previous reports. The two standards were chosen for this analysis because IEEE 323 is the standard used in the U.S. for the qualification of safety-related equipment in nuclear power plants, and IEC 60780 is its European counterpart. In addition, the IEC document was published in

  11. Seismic qualification testing at the National Engineering Laboratory

    International Nuclear Information System (INIS)

    Fairbairn, J.

    1984-01-01

    Servohydraulic shaker tables have been developed for the simulation of vibration environments including earthquakes. The use of these facilities for seismic qualification of nuclear equipment is described. (author)

  12. The utilization of VUJE specialists non-destructive testing qualification at international cooperation with company TECNATOM

    International Nuclear Information System (INIS)

    Kuna, M.

    2006-01-01

    The utilization of VUJE specialists non-destructive testing qualification at cooperation with company TECNATOM. The obtain of QDA qualification for ET examination for possibility of qualified evaluation in the foreign NPP (USA, Brazil). The acquired practical experiences by evaluation of ET data from NPP Angra Brazil and Waltz Mill USA. The obtain of SNT-TC-1A and EPRI qualification for the UT evaluation of penetration tube welds measurements. The practical experience during the measurement on NPP Shearon Harris (Author)

  13. Qualification tests for ITER TF conductors in SULTAN

    International Nuclear Information System (INIS)

    Bruzzone, P.; Stepanov, B.; Wesche, R.

    2009-01-01

    From February 2007 to May 2008, 18 short length conductor sections have been tested in SULTAN for design verification and manufacturer qualification of the ITER Toroidal Field (TF) conductor. The test program is focussed on the current sharing temperature, T cs , at the nominal operating conditions, 68 kA current and 11.15 T effective field, which can be fully reproduced in the SULTAN test facility. A broad range of results was observed, with over 2 K difference among the T cs of the conductors. In average, the results are poorer compared to the potential performance estimated from the strand scaling law. The key parameters to mitigate the degradation are not yet clearly identified. The experimental challenges to test conductors with performance degradation are highlighted, including enhanced instrumentation sets, the application of gas flow calorimetry to sense the current sharing power and the post-processing of voltage data to cancel the transverse potential across the cable. The updated schedule of the tests in SULTAN is presented with the short-term action plan for conductor test.

  14. Recent developments in methodology for dynamic qualification of nuclear plant equipment

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-01-01

    Dynamic qualification of nuclear plant electrical and mechanical equipment is performed basically under guidelines given in IEEE Standards 323 and 344, and a variety of NRC regulatory guides. Over the last fifteen years qualification methodology prescribed by these documents has changed significantly as interpretations, equipment capability, and imagination of the qualification engineers have progressed. This progress has been sparked by concurrent NRC and industry sponsored research programs that have identified anomalies and developed new methodologies for resolving them. Revisions of the standards have only resulted after a lengthy debate of all such new information and subsequent judgment of its validity. The purpose of this paper is to review a variety of procedural improvements and developments in qualification methodology that are under current consideration as revisions to the standards. Many of the improvements and developments have resulted from recent research programs. All are very likely to appear in one type of standard or another in the near future

  15. Qualification of NDT techniques for in-service inspections in nuclear power plants in accordance with ENIQ - examples and lessons - learned

    International Nuclear Information System (INIS)

    Just, T.; Csapo, G.

    2006-01-01

    ENIQ (European Network for Inspection and Qualification) has developed regulations on how to qualify non-destructive testing (NDT) methods and techniques in a standardized and structured manner. Two major innovative qualifications were carried out and reviewed with regard to implementation, according to the recommended German practice of ENIQ. The conclusions were drawn after performing the ENIQ qualification procedure for in-service inspections (ISI) of real components in nuclear power plants (NPP). The first example covers the qualification of NDT methods for the detection and characterization of surface, subsurface and underclad cracks in the area of the austenitic cladded RPV surface. Open and blind tests were conducted applying UT and ET (from the ID) and UT (from the OD) on realistic flaws (artificially induced IGSCC, hot cracks and fatigue cracks) in the cladding of a full scale RPV mock-up from MPA Stuttgart. The second example covers the qualification of mechanised RT in combination with tomography (developed by the BAM) for the sizing of cracks in pipe welds. For both qualification procedures TUEV NORD SysTec experts were part of the qualification body. The proposed NDT procedures have been qualified within defined limits of application. Recommendations were made to optimise the procedures and the techniques itself further. (orig.)

  16. Procedure for the qualification of a manufacturer of ingot iron pieces for application in nuclear power plant components

    International Nuclear Information System (INIS)

    Rahn, K.M.M.; Jusevicius, E.; Michael, H.

    1981-01-01

    The process for the qualification of 'Sao Caetano do Sul (Acos Villares S/A)' Plant as manufacturers of ingot iron pieces for application in components of Angra 2 and Angra 3 Nuclear Power Plants, is presented. The qualification was executed by IBQN - Instituto Brasileiro de Qualidade Nuclear - the organ officially in charge of the execution of qualification of suppliers of materials for the nuclear industry. (E.G.) [pt

  17. Qualification of quality testing personnel, in particular the training offered

    International Nuclear Information System (INIS)

    Knoedler, D.

    1980-01-01

    Personnel qualification is one of the most important tasks of quality assurance. The qualification is reached by professional education, by experience made on the job and by additional external and company-internal training. A determination of qualification requirements should cover only the general principles. Especially this should be considered specifying the requirements for theoretical knowledge and for examinations since the factor of relevant experience is difficult to be estimated by third parties. Equal principles apply for the personnel of the manufacturer, of the main contractor, of the utility and of the auhtorized inspectors' organizations. The detailed guidelines should be part of the internal QA-systems of the organizations involved. (orig.) [de

  18. A study on the chemical cleaning process and its qualification test by eddy current testing

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Ki Seok; Cheon, Keun Young; Nam, Min Woo [KHNP Central Research Institute, Daejeon (Korea, Republic of); Min, Kyoung Mahn [UMI Inc., Daejeon (Korea, Republic of)

    2013-12-15

    Steam Generator (SG) tube, as a barrier isolating the primary coolant system from the secondary side of nuclear power plants (NPP), must maintain the structural integrity for the public safety and their efficient power generation. So, SG tubes are subject to the periodic examination and the repairs if needed so that any defective tubes are not in service. Recently, corrosion related degradations were detected in the tubes of the domestic OPR-1000 NPP, as a form of axially oriented outer diameter stress corrosion cracking (ODSCC). According to the studies on the factors causing the heat fouling as well as developing corrosion cracking, densely scaled deposits on the secondary side of the SG tubes are mainly known to be problematic causing the adverse impacts against the soundness of the SG tubes. Therefore, the processes of various cleaning methods efficiently to dissolve and remove the deposits have been applied as well as it is imperative to maintain the structural integrity of the tubes after exposing to the cleaning agent. So qualification test (QT) should be carried out to assess the perfection of the chemical cleaning and QT is to apply the processes and to do ECT. In this paper, the chemical cleaning processes to dissolve and remove the scaled deposits are introduced and results of ECT on the artificial crack specimens to determine the effectiveness of those processes are represented.

  19. Irradiation and beam tests qualification for ATLAS IBL Pixel Modules

    International Nuclear Information System (INIS)

    Rubinskiy, Igor

    2013-01-01

    The upgrade for the ATLAS detector will have different steps towards HL-LHC. The first upgrade for the Pixel Detector will consist in the construction of a new pixel layer which will be installed during the first shutdown of the LHC machine (foreseen for 2013–2014). The new detector, called Insertable B-Layer (IBL), will be inserted between the existing Pixel Detector and a new (smaller radius) beam-pipe at a radius of 33 mm. The IBL will require the development of several new technologies to cope with the increase in the radiation damage and the pixel occupancy and also to improve the physics performance, which will be achieved by reduction of the pixel size and of the material budget. Two different promising silicon sensor technologies (Planar n-in-n and 3D) are currently under investigation for the Pixel Detector. An overview of the sensor technologies' qualification with particular emphasis on irradiation and beam tests is presented. -- Highlights: ► The ATLAS inner tracker will be extended with a so called Insertable B-Layer (IBL). ► The IBL modules are required to withstand irradiation up to 5×10 15 n eq /cm 2 . ► Two types of silicon pixel detector technologies (Planar and 3D) were tested in beam. ► The irradiated sensor efficiency exceeds 97% both with and without magnetic field. ► The leakage current, power dissipation, module active area ratio requirements are met.

  20. Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 3. Recommendations for improvement of equipment qualification methodology and criteria. Volume 3

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-08-01

    The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 3 presents recommendations for improvement of equipment qualification methodology and procedural clarification/modification. The fifth category identifies issues where adequate information does not exist to allow a recommendation to be made

  1. Testing and qualification of CIRCE venturi-nozzle flow meter for large scale experiments

    International Nuclear Information System (INIS)

    Ambrosini, W.; Forgione, N.; Oriolo, F.; Tarantino, M.; Agostini, P.; Benamati, G.; Bertacci, G.; Elmi, N.; Alemberti, A.; Cinotti, L.; Scaddozzo, G.

    2005-01-01

    This paper is focused on the tests carried out at the ENEA Brasimone Centre for the qualification of a large Venturi-Nozzle flow meter operating in Lead Bismuth Eutectic (LBE). Such flow meter has been selected to provide flow rate measurements during the thermal-hydraulic tests that will be performed on the experimental facility CIRCE. This large-scale facility is installed at the ENEA Brasimone Centre for studying the fluid-dynamics and operating behaviour of ADS reactor plants, as well as to qualify several components intended to be used in the LBE technology. The Venturi-Nozzle flow meter has been supplied by the Euromisure s.r.l., together with the calculated theoretical characteristic equation. The results obtained by the tests performed allowed to qualify this theoretical curve supplied by the manufacturer, that presents a very good agreement especially at high flow rate values. (authors)

  2. Qualification, certification and training systems of a Japanese nuclear power plant supplier

    International Nuclear Information System (INIS)

    Yoshijima, S.; Tomita, J.; Yoneda, Y.

    1982-01-01

    Training and indoctrination of personnel are very important for performing quality assurance activities in nuclear power plants. The paper presents policies, procedures and practices with regard to a training system for site construction workers, a training system for plant operation personnel at a special facility, and services and activities for operating plants. The training system for site workers and technicians offers basic training for all workers, and special training and qualification for field welders, cable-termination workers and non-destructive examination personnel. In addition to the qualification system for field welders applied by the regulatory body, a privat-company qualification system exists. Also, a training centre for BWR operators has been established. This facility has a simulator duplicating the main control room of an actual plant and a computer-assisted instruction system. Standard training courses, short-term basic courses, re-training courses, group training courses and special training courses are held at the training centre. Finally, the services and activities performed by Toshiba Corporation for operating plants are described. These activities of the plant supplier aim at keeping up and further enhancing the safety and reliability of operating plants and mainly consist of: (1) collection and evaluation of plant operation data, with re-evaluation and improvement of systems and components; (2) development of new maintenance techniques; (3) development of measures for reducing annual outage periods; and (4) plant emergency preparedness. (author)

  3. Nuclear power plant personnel entry level qualifications and training

    International Nuclear Information System (INIS)

    Jorgensen, C.C.; Haas, P.M.; Selby, D.L.; Lowry, J.C.

    1983-01-01

    This paper summarizes the early results and current status of a research program at ORNL which is intended to provide the methods and technical basis for NRC to initiate the use of the Systems Approach to Training (SAT) in the evaluation of training programs and entry level qualifications for NPP control room personnel. The program is an outgrowth of previous studies of simulator hardware and simulator training requirements under the Safety Related Operator Actions Program which recommended adaptation of a systems methodology to development and evaluation of NPP training programs

  4. Staffing, recruitment, training, qualification and certification of operating personnel of nuclear power plants

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and the use of radioactive sources. This safety guide provides guidance on the aspects of staffing, recruitment, training, qualification and certification of operating personnel of nuclear power plants

  5. Testing and qualification of confidence in statistical procedures

    Energy Technology Data Exchange (ETDEWEB)

    Serghiuta, D.; Tholammakkil, J.; Hammouda, N. [Canadian Nuclear Safety Commission (Canada); O' Hagan, A. [Sheffield Univ. (United Kingdom)

    2014-07-01

    This paper discusses a framework for designing artificial test problems, evaluation criteria, and two of the benchmark tests developed under a research project initiated by the Canadian Nuclear Safety Commission to investigate the approaches for qualification of tolerance limit methods and algorithms proposed for application in optimization of CANDU regional/neutron overpower protection trip setpoints for aged conditions. A significant component of this investigation has been the development of a series of benchmark problems of gradually increased complexity, from simple 'theoretical' problems up to complex problems closer to the real application. The first benchmark problem discussed in this paper is a simplified scalar problem which does not involve extremal, maximum or minimum, operations, typically encountered in the real applications. The second benchmark is a high dimensional, but still simple, problem for statistical inference of maximum channel power during normal operation. Bayesian algorithms have been developed for each benchmark problem to provide an independent way of constructing tolerance limits from the same data and allow assessing how well different methods make use of those data and, depending on the type of application, evaluating what the level of 'conservatism' is. The Bayesian method is not, however, used as a reference method, or 'gold' standard, but simply as an independent review method. The approach and the tests developed can be used as a starting point for developing a generic suite (generic in the sense of potentially applying whatever the proposed statistical method) of empirical studies, with clear criteria for passing those tests. Some lessons learned, in particular concerning the need to assure the completeness of the description of the application and the role of completeness of input information, are also discussed. It is concluded that a formal process which includes extended and detailed benchmark

  6. Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    Energy Technology Data Exchange (ETDEWEB)

    Spaang, Kjell [Ingemansson Technology AB, Goeteborg (Sweden); Staahl, Gunnar [Westinghouse Atom, Vaesteraas (Sweden)

    2002-05-01

    This report reviews R and D results and experiences forming the bases for the preparation of a report on management of ageing. It includes basic information and descriptions of value for persons who work with the questions and some data from investigations of the ageing characteristics of various materials: limit levels, dose-rate effects, activation energies, methods for condition monitoring, etc. This report is restricted to safety related components containing ageing sensitive parts, mainly organic materials (polymers). For components located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. Therefore, the main part of this report deals with the qualification of such components. In addition, some material is given on qualification located outside containment with better possibilities for frequent inspection and supervision. A survey is made of activities, programs and tools for ageing qualification in connection with initial environmental qualification (type testing) as well as after installation (condition monitoring, extension of qualified life through on-going qualification). Tools are also given for supplementary ageing qualification of already installed components.

  7. Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2002-05-01

    This report reviews R and D results and experiences forming the bases for the preparation of a report on management of ageing. It includes basic information and descriptions of value for persons who work with the questions and some data from investigations of the ageing characteristics of various materials: limit levels, dose-rate effects, activation energies, methods for condition monitoring, etc. This report is restricted to safety related components containing ageing sensitive parts, mainly organic materials (polymers). For components located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. Therefore, the main part of this report deals with the qualification of such components. In addition, some material is given on qualification located outside containment with better possibilities for frequent inspection and supervision. A survey is made of activities, programs and tools for ageing qualification in connection with initial environmental qualification (type testing) as well as after installation (condition monitoring, extension of qualified life through on-going qualification). Tools are also given for supplementary ageing qualification of already installed components

  8. Qualification and Flight Test of Non-Chrome Primers for C-130 Aircraft

    Science.gov (United States)

    2011-08-17

    system  Significant hexavalent chrome reduction in finish system  Potential exposure level of spray applied chromated conversion coating not as...Lockheed Martin Aeronautics Company Qualification and Flight Test of Non- Chrome Primers for C-130 Aircraft Scott Jones Lockheed Martin...00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Qualification and Flight Test of Non- Chrome Primers for C-130 Aircraft 5a. CONTRACT NUMBER 5b. GRANT

  9. Recruitment, qualification and training of personnel for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    The objective of this Safety Guide is to outline the various factors that should to be considered in order to ensure that the operating organization has a sufficient number of qualified personnel for safe operation of a nuclear power plant. In particular, the objective of this publication is to provide general recommendations on the recruitment and selection of plant personnel and on the training and qualification practices that have been adopted in the nuclear industry since the predecessor Safety Guide was published in 1991. In addition, this Safety Guide seeks to establish a framework for ensuring that all managers and staff employed at a nuclear power plant demonstrate their commitment to the management of safety to high professional standards. This Safety Guide deals specifically with those aspects of qualification and training that are important to the safe operation of nuclear power plants. It provides recommendations on the recruitment, selection, qualification, training and authorization of plant personnel. That is, of all personnel in all safety related functions and at all levels of the plant. Some parts or all of this Safety Guide may also be used, with due adaptation, as a guide to the recruitment, selection, training and qualification of staff for other nuclear installations (such as research reactors or nuclear fuel cycle facilities). Section 2 gives guidance on the recruitment and selection of suitable personnel for a nuclear power plant. Section 3 gives guidance on the establishment of personnel qualification, explains the relationship between qualification and competence, and identifies how competence may be developed through education, experience and training. Section 4 deals with general aspects of the training policy for nuclear power plant personnel: the systematic approach, training settings and methods, initial and continuing training, and the keeping of training records. Section 5 provides guidance on the main aspects of training programmes

  10. Recruitment, qualification and training of personnel for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    The objective of this Safety Guide is to outline the various factors that should to be considered in order to ensure that the operating organization has a sufficient number of qualified personnel for safe operation of a nuclear power plant. In particular, the objective of this publication is to provide general recommendations on the recruitment and selection of plant personnel and on the training and qualification practices that have been adopted in the nuclear industry since the predecessor Safety Guide was published in 1991. In addition, this Safety Guide seeks to establish a framework for ensuring that all managers and staff employed at a nuclear power plant demonstrate their commitment to the management of safety to high professional standards. This Safety Guide deals specifically with those aspects of qualification and training that are important to the safe operation of nuclear power plants. It provides recommendations on the recruitment, selection, qualification, training and authorization of plant personnel; that is, of all personnel in all safety related functions and at all levels of the plant. Some parts or all of this Safety Guide may also be used, with due adaptation, as a guide to the recruitment, selection, training and qualification of staff for other nuclear installations (such as research reactors or nuclear fuel cycle facilities). Section 2 gives guidance on the recruitment and selection of suitable personnel for a nuclear power plant. Section 3 gives guidance on the establishment of personnel qualification, explains the relationship between qualification and competence, and identifies how competence may be developed through education, experience and training. Section 4 deals with general aspects of the training policy for nuclear power plant personnel: the systematic approach, training settings and methods, initial and continuing training, and the keeping of training records. Section 5 provides guidance on the main aspects of training programmes

  11. Thermal Analysis for Environmental Qualification of Kori Nuclear power plant unit 3 and 4

    International Nuclear Information System (INIS)

    Seo, Kwi Hyun; Byun, Choong Sup; Song, Dong Soo

    2006-01-01

    This paper shows the temperature profiles of safety related electrical equipment exposed to MSLB inside containment. It must be demonstrated that the LOCA qualification conditions exceed or are equivalent to the maximum calculated MSLB conditions. COPATTA as Bechtel's vendor code is used for the containment pressure and temperature prediction in power uprating project for Kori 3,4 and Yonggwang 1,2 nuclear power plants(NPPs). However, CONTEMPT-LT/028 is used for calculating the containment pressure and temperatures in equipment qualification project for the same NPPs. Power uprating code that is, COPATTA benchmarking study performed in six equipment at saturation temperature and surface temperature. Specially, thermal analysis carefully investigate that view point environmental qualification and NUREG- 0588 be mentioned in regard to safety-related heat sink it boundary condition or geometry information

  12. Thermal Analysis for Environmental Qualification of Kori Nuclear power plant unit 3 and 4

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Kwi Hyun [ENERGEO Inc., Sungnam (Korea, Republic of); Byun, Choong Sup; Song, Dong Soo [KEPRI, Taejon (Korea, Republic of)

    2006-07-01

    This paper shows the temperature profiles of safety related electrical equipment exposed to MSLB inside containment. It must be demonstrated that the LOCA qualification conditions exceed or are equivalent to the maximum calculated MSLB conditions. COPATTA as Bechtel's vendor code is used for the containment pressure and temperature prediction in power uprating project for Kori 3,4 and Yonggwang 1,2 nuclear power plants(NPPs). However, CONTEMPT-LT/028 is used for calculating the containment pressure and temperatures in equipment qualification project for the same NPPs. Power uprating code that is, COPATTA benchmarking study performed in six equipment at saturation temperature and surface temperature. Specially, thermal analysis carefully investigate that view point environmental qualification and NUREG- 0588 be mentioned in regard to safety-related heat sink it boundary condition or geometry information.

  13. Qualification of quality assurance program audit personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Requirements and guidance are provided for the qualification of Auditors and Lead Auditors who perform audits for plant owners, contractors or others participating in activities affecting the quality of structures, systems and components of nuclear power plants. The Lead Auditor is the audit team leader, who organizes and directs audits, reports, audit findings, and evaluates corrective action. Auditors include technical specialists, management representatives and auditors-in-training. This standard is to be used in conjunction with ANSI N45.2.12

  14. Qualification tests of materials for spallation neutron sources

    International Nuclear Information System (INIS)

    Sommer, W.F.; Maloy, S.; Wechsler, M.S.

    1997-01-01

    Several laboratories will take part in an extensive materials qualification program that includes irradiation in the proton beam and neutron field available at the Los Alamos Spallation Radiation Damage Facility (LASREF). A number of candidate materials will be exposed to prototypic spallation producing particle radiation. Studies of corrosion-related phenomena and the mitigation of these effects will also be accomplished

  15. WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Smith, T. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Pareizs, J. M. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-06-01

    The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combined 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing. These

  16. Qualification of quality assurance program audit personnel for nuclear power plants - August 1980

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, establishes overall quality assurance requirements for the design, construction, and operation of safety-related structures, and components of nuclear power plants. Criterion XVIII, Audits, of Appendix B establishes requirements for conducting audits of the quality assurance program. This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to qualification of quality assurance program audit personnel for nuclear power plants

  17. Testing of Small Graphite Samples for Nuclear Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Julie Chapman

    2010-11-01

    Accurately determining the mechanical properties of small irradiated samples is crucial to predicting the behavior of the overal irradiated graphite components within a Very High Temperature Reactor. The sample size allowed in a material test reactor, however, is limited, and this poses some difficulties with respect to mechanical testing. In the case of graphite with a larger grain size, a small sample may exhibit characteristics not representative of the bulk material, leading to inaccuracies in the data. A study to determine a potential size effect on the tensile strength was pursued under the Next Generation Nuclear Plant program. It focuses first on optimizing the tensile testing procedure identified in the American Society for Testing and Materials (ASTM) Standard C 781-08. Once the testing procedure was verified, a size effect was assessed by gradually reducing the diameter of the specimens. By monitoring the material response, a size effect was successfully identified.

  18. Qualifications and training of staff of the regulatory body for nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It supplements the Agency's Safety Series No.50-C-G, entitled ''Governmental Organization for the Regulation of Nuclear Power Plants: A Code of Practice'', and is mainly concerned with the qualifications and training requirements of the staff of bodies regulating nuclear power plants. It is not concerned with staff for regulating other phases of the fuel cycle, such as fuel fabrication and management. This Guide provides recommendations and guidance for establishing the qualifications required for the staff of the regulatory body. These requirements include academic training, work experience and other abilities. It also establishes the training programmes and activities necessary for personnel within the regulatory body

  19. Radiated EMC& EMI Management During Design Qualification and Test Phases on LEO Satellites Constellation

    Science.gov (United States)

    Blondeaux, H.; Terral, M.; Gutierrez-Galvan, R.; Baud, C.

    2016-05-01

    The aim of the proposed paper is to present the global radiated EMC/EMI approach applied by Thales Alenia Space in the frame of a telecommunication Low Earth Orbit (LEO) satellites constellation program. The paper will present this approach in term of analyses, of specific characterisation and of sub-system and satellite tests since first design reviews up-to satellite qualification tests on Prototype Flight Model (PFM) and to production tests on reduced FMs. The global aim is : 1 - to reduce risk and cost (units EMC delta qualification, EMC tests at satellite level for the 81 Space Vehicles (SV) through appropriated EMC analyses (in term of methodologies and contours) provided in the frame of design reviews.2 - to early anticipate potential critical case to reduce the impact in term of engineering/qualification/test extra cost and of schedule.3 - to secure/assure the payload and SV design/layout.4 - to define and optimize the EMC/EMI test campaigns to be performed on Prototype Flight Model (PFM) for complete qualification and on some FMs for industrial qualification/validation.The last part of the paper is dedicated to system Bite Error Rate (BER) functional test performed on PFM SV to demonstrate the final compatibility between the three on-board payloads and to the Internal EMC tests performed on PFM and some FMs to demonstrate the SV panel RF shielding efficiency before and after environmental tests and the Thales Alenia Space (TAS) and Orbital AKT (OATK) workmanships reproducibility.

  20. Qualification of expansion and welding procedures of tube-to-tubesheet joints for heat exchangers in nuclear power plants

    International Nuclear Information System (INIS)

    Camargo, G.D.M.; Couto, J.G.V.; Castro, L.A.S. de

    1986-01-01

    Leaking tube to tubesheet joints are among the most frequent defects detected in the operation of tubular heat exchangers. This kind of problem requires a special treatment, in the case of heat exchangers intalled in nuclear power plants, aiming at a minimum of leakages and further repair outages. The criteria used for the pre-qualification of tube-to-tubesheet joints, is described, and the experiences acquired during the tests and fabrication of several components supplied by national manufacturers, are presented. (Author) [pt

  1. On-site tests on the nuclear power plants

    International Nuclear Information System (INIS)

    Morilhat, P.; Favennec, J.M.; Neau, P.; Preudhomme, E.

    1996-01-01

    On-site tests and experiments are performed by EDF Research and Development Division on the nuclear power plants to assess the behaviour of major components submitted to thermal and vibratory solicitations. On-going studies deal with the qualification of new nuclear power plant standard and with the feedback of plants under operation. The tests, particularly the investigation tests, correspond to large investments and entail an important data volume which must ensure the continuity over a long period of the order of magnitude of the in-service plant life (around 40 years). This paper addresses the on-site experimental activities, describes the means to be used, and gives an example: the qualification of SG of new 1450 MW nuclear power plants. (author)

  2. Educational systems - educational qualification of nuclear power plant personnel

    International Nuclear Information System (INIS)

    Boeger, H.

    1986-01-01

    In this lecture the following common features of education and training systems are described: - description of general school education, vocational training and engineering study programs, - allocation of categories of activities to normal school training backgrounds, - recommendations for educational and training programs required for various positions in nuclear power plants (formal and on-the-job training), - examinations and licences for the personnel at nuclear power plants. (orig./GL)

  3. Methodology for qualification of in-service inspection systems for WWER nuclear power plants. A publication of the extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

    International Nuclear Information System (INIS)

    1998-03-01

    Program was initiated by IAEA in 1990 with the aim to assist the countries of Central and Eastern Europe and former Soviet Union in evaluating the safety of their first generation WWER-440/230 nuclear power plants. The main objectives were: to identify major design and operational safety issues; to establish international consensus on priorities for safety improvements; and to provide assistance in the review of the competence and and adequacy of safety improvement programs. The scope was extended in 1992 to include RBMK, WWER-440/312 and WWER-1000 plants in operation and under construction. Integrity of primary circuit is fundamental for the safe operation of any nuclear power plant. In-service inspection (ISI) in general terms and in particular, non-destructive tests (NDT) play a key role in maintaining primary circuit integrity. This report provides a methodology for qualification of ISI systems which might be used by WWER operating countries as a commonly accepted basis for further development of the necessary qualification related infrastructures. It also provides several qualification principles defining the administrative framework needed for the practical implementation of the methodology, a description of the process of qualification of an inspection system, specifying its minimum technical and documentation related requirements, as well as specific requirements with regard to the NDT procedures, equipment and personnel to be qualified and the test specimen to be used in practical trials. Finally, the report suggests an appropriate distribution of responsibilities among all the parties involved in a qualification process, based on international practice

  4. A summary of the conclusions of generic issue 113: Dynamic qualification and testing of large bore hydraulic snubbers

    International Nuclear Information System (INIS)

    Ware, A.G.; Nitzel, M.E.

    1993-01-01

    The Nuclear Regulatory Commission (NRC) developed Generic Issue 113, Dynamic Qualification and Testing of Large Bore Hydraulic Snubbers (LBHSs), with the objective of evaluating the reliability of LBHSs in operating commercial nuclear power plants. For the purposes of this research, LBHSs were defined as those hydraulic snubbers with rated load capacities ≥50 kips. Relatively high LBHS failure rates were common during the early 1980s; however, industry actions taken during the last several years in response to increased inspection and testing requirements have resulted in lower LBHS failure rates. To address the issue of LBHS adequacy, the NRC developed Generic Issue 113 (GI-113). This paper provides a summary of the important findings of the GI-113 research program and a discussion of the recommendations that were made in NUREG/CR-5416. Fifteen potential improvements in LBHS reliability were identified, covering the areas of design, environmental (including dynamic) qualification, functional testing, visual inspection, and personnel training. Probabilistic risk assessment studies were used to perform a cost/benefit analysis for each. There were five potential improvements in functional testing and visual inspections with low cost/benefit ratios for both existing and future nuclear plants, and an additional six potential improvements that were determined to be cost beneficial only for future plants. Further investigations of the single failure of snubbers that could damage critical components or systems were recommended in NUREG/CR-5416

  5. Analysis of the Qualification-Tests Performance of the Superconducting Cavities for the SNS Linac

    CERN Document Server

    Delayen, J R; Ozelis, O

    2004-01-01

    Thomas Jefferson National Accelerating Facility (Jefferson Lab) is producing superconducting radio frequency (SRF) cryomodules for the Spallation Neutron Source (SNS) cold linac. This consists of 11 medium-beta (β=0.61) cyomodules of 3 cavities each, and 12 high-beta (β=0.81) cryomodules of 4 cavities each. Before assembly into cavity strings the cavities undergo individual qualification tests in a vertical cryostat (VTA). In this paper we analyze the performance of the cavities during these qualification tests, and attempt to correlate this performance with cleaning, assembly, and testing procedures. We also compare VTA performance with performance in completed cryomodules.

  6. In search of extendable conditions for cable environmental qualification in nuclear power plants

    International Nuclear Information System (INIS)

    Alshaketheep, Tariq; Sekimura, Naoto; Itoi, Tatsuya; Murakami, Kenta

    2016-01-01

    The environmental qualification (EQ) for cable insulators in nuclear power plants (NPPs) has been developed on the basis of the design basis accident (DBA) to prevent reactor core damage. However, the latest safety principles require extending the design concept to prepare the utilized equipment for scenarios after core damage. Thus, we propose a modification to the EQ for cables connecting utilized equipment at design extension conditions. This paper surveys all electrical components for accident management in boiling water reactor-4 (BWR-4), and identifies their connecting cables' functional category as low-voltage power, instrumentation, and control cables. The EQ temperature profile of these cables during the incident phase was addressed for extension. This required postulating maximum temperature environments according to accident scenarios, knowledge of cable integrity degradation, and their current evaluation by the EQ. To evaluate whether these environments are suitable stressors, heat testing was conducted on flame-retardant ethylene propylene rubber (FR-EPR)-insulated cables. On the basis of those results, we suggest a maximum primary peak temperature of the EQ temperature profile of 250degC. We also suggest increasing the primary peak period of the EQ temperature profile to 48 h without experiment, on the basis of inherent excessive margin for mechanical integrity during the ageing phase. (author)

  7. Next Generation Nuclear Plant Materials Selection and Qualification Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    R. Doug Hamelin; G. O. Hayner

    2004-11-01

    The U.S. Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design is a graphite-moderated, helium-cooled, prismatic or pebble bed thermal neutron spectrum reactor with an average reactor outlet temperature of at least 1000 C. The NGNP will use very high burn up, lowenriched uranium, TRISO-Coated fuel in a once-through fuel cycle. The design service life of the NGNP is 60 years.

  8. Review of seismic tests for qualification of components and validation of methods

    International Nuclear Information System (INIS)

    Buland, P.; Gantenbein, F.; Gibert, R.J.; Hoffmann, A.; Queval, J.C.

    1988-01-01

    Seismic tests are performed in CEA-DEMT since many years in order: to demonstrate the qualification of components, to give an experimental validation of calculation methods used for seismic design of components. The paper presents examples of these two types of tests, a description of the existing facilities and details about the new facility TAMARIS under construction. (author)

  9. Review of seismic tests for qualification of components and validation of methods

    Energy Technology Data Exchange (ETDEWEB)

    Buland, P; Gantenbein, F; Gibert, R J; Hoffmann, A; Queval, J C [CEA-CEN SACLAY-DEMT, Gif sur Yvette-Cedex (France)

    1988-07-01

    Seismic tests are performed in CEA-DEMT since many years in order: to demonstrate the qualification of components, to give an experimental validation of calculation methods used for seismic design of components. The paper presents examples of these two types of tests, a description of the existing facilities and details about the new facility TAMARIS under construction. (author)

  10. 27 CFR 18.40 - Qualification to alternate volatile fruit-flavor concentrate plant and bonded wine cellar.

    Science.gov (United States)

    2010-04-01

    ... volatile fruit-flavor concentrate plant and bonded wine cellar. 18.40 Section 18.40 Alcohol, Tobacco... Qualification to alternate volatile fruit-flavor concentrate plant and bonded wine cellar. A proprietor of a volatile fruit-flavor concentrate plant operating a contiguous bonded wine cellar may alternate the use of...

  11. Seismic design and qualification for nuclear power plants

    International Nuclear Information System (INIS)

    1992-01-01

    This safety guide, which supplements the IAEA Code on the Safety of Nuclear Power Plants (NPP); Design (IAEA Safety Series No.50-C-D (Rev.1)), forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes and Guides relating to land based stationary thermal neutron power plants. The present Guide was originally issued in 1979 as Safety Guide 50-SG-S2 within the series of NUSS guides for the siting of NPP, extending seismic considerations from Safety Guide 50-SG-S1 into the design and verification field. During the revision phase in 1988-1990, this emphasis on design aspects was confirmed and consequently the Guides have been reclassified as a design Guide with the corresponding identification number 50-SG-D15. The general character of the Guide has not been changed an it still relates strongly to 50-SG-S1, which gives guidance on how to determine design basis ground motion for a NPP at a given site

  12. Seismic qualification of equipment in operating nuclear power plants. Unresolved safety issue A-46, draft report for comment

    International Nuclear Information System (INIS)

    Chang, T.Y.

    1985-08-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform their intended safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants should be reassessed to determine whether requalification is necessary. The objective of technical studies performed under the Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring qualification to the current criteria that are applied to new plants. This report summarizes the work accomplished on USI A-46 by the Nuclear Regulatory Commission staff and its contractors, Idaho National Engineering Laboratory, Southwest Research Institute, Brookhaven National Laboratory, and Lawrence Livermore National Laboratory. In addition, the collection and review of seismic experience data by the Seismic Qualification Utility Group and the review and recommendations of a group of seismic consultants, the Senior Seismic Review Advisory Panel, are presented. Staff assessment of work accomplished under USI A-46 leads to the conclusion that the use of seismic experience data provides the most reasonable alternative to current qualification criteria. Consideration of seismic qualification by use of experience data was a specific task in USI A-46. Several other A-46 tasks serve to support the use of an experience data base

  13. Qualification of a full plant nodalization for the prediction of the core exit temperature through a scaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Freixa, J., E-mail: jordi.freixa-terradas@upc.edu; Martínez-Quiroga, V., E-mail: victor.martinez.quiroga@upc.edu; Reventós, F., E-mail: francesc.reventos@upc.edu

    2016-11-15

    Highlights: • Core exit temperature is used in PWRs as an indication of core heat up. • Qualification of full scale nuclear reactors by means of a scaling methodology. • Scaling of RELAP5 calculations to full scale power plants. - Abstract: System codes and their necessary power plant nodalizations are an essential step in thermal hydraulic safety analysis. In order to assess the safety of a particular power plant, in addition to the validation and verification of the code, the nodalization of the system needs to be qualified. Since most existing experimental data come from scaled-down facilities, any qualification process must therefore address scale considerations. The Group of Thermal Hydraulic Studies at Technical University of Catalonia has developed a scaling-up methodology (SCUP) for the qualification of full-scale nodalizations through a systematic procedure based on the extrapolation of post-test simulations of Integral Test Facility experiments. In the present work, the SCUP methodology will be employed to qualify the nodalization of the AscóNPP, a Pressurized Water Reactor (PWR), for the reproduction of an important safety phenomenon which is the effectiveness of the Core Exit Temperature (CET) as an Accident Management (AM) indicator. Given the difficulties in placing measurements in the core region, CET measurements are used as a criterion for the initiation of safety operational procedures during accidental conditions in PWR. However, the CET response has some limitation in detecting inadequate core cooling simply because the measurement is not taken in the position where the cladding exposure occurs. In order to apply the SCUP methodology, the OECD/NEA ROSA-2 Test 3, an SBLOCA in the hot leg, has been selected as a starting point. This experiment was conducted at the Large Scale Test Facility (LSTF), a facility operated by the Japanese Atomic Energy Agency (JAEA) and was focused on the assessment of the effectiveness of AM actions triggered by

  14. Non-destructive qualification tests for ITER cryogenic axial insulating breaks

    International Nuclear Information System (INIS)

    Kosek, Jacek; Lopez, Roberto; Tommasini, Davide; Rodriguez-Mateos, Felix

    2014-01-01

    In the ITER superconducting magnets the dielectric separation between the CICC (Cable-In-Conduit Conductors) and the helium supply pipes is made through the so-called insulating breaks (IB). These devices shall provide the required dielectric insulation at a 30 kV level under different types of stresses and constraints: thermal, mechanical, dielectric and ionizing radiations. As part of the R and D program, the ITER Organization launched contracts with industrial companies aimed at the qualification of the manufacturing techniques. After reviewing the main functional aspects, this paper describes and discusses the protocol established for non-destructive qualification tests of the prototypes

  15. Seismic qualification using digital signal processing/modal testing and finite element techniques

    International Nuclear Information System (INIS)

    Steedman, J.B.; Edelstein, A.

    1983-01-01

    A systematic procedure in which digital signal processing, modal testing and finite element techniques can be used to seismically qualify Class IE equipment for use in nuclear generating stations is presented. A new method was also developed in which measured transmissibility functions and Fourier transformation techniques were combined to compute instrument response spectra. As an illustrative example of the qualification method, the paper follows the qualification of a safety related Class IE Heating, Ventilating, and Air Conditioning (HVAC) Control Panel subjected to both seismic and hydrodynamic loading conditions

  16. Non-destructive qualification tests for ITER cryogenic axial insulating breaks

    Energy Technology Data Exchange (ETDEWEB)

    Kosek, Jacek [Wroclaw University of Technology, Wybrzeze Wyspianskiego 27, 50-370 Wroclaw, Poland and CERN, Geneva 23,CH-1211 (Switzerland); Lopez, Roberto; Tommasini, Davide [CERN, Geneva 23,CH-1211 (Switzerland); Rodriguez-Mateos, Felix [CERN, Geneva 23,CH-1211, Switzerland and ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul lez Durance (France)

    2014-01-29

    In the ITER superconducting magnets the dielectric separation between the CICC (Cable-In-Conduit Conductors) and the helium supply pipes is made through the so-called insulating breaks (IB). These devices shall provide the required dielectric insulation at a 30 kV level under different types of stresses and constraints: thermal, mechanical, dielectric and ionizing radiations. As part of the R and D program, the ITER Organization launched contracts with industrial companies aimed at the qualification of the manufacturing techniques. After reviewing the main functional aspects, this paper describes and discusses the protocol established for non-destructive qualification tests of the prototypes.

  17. Contribution of the ultrasonic simulation to the testing methods qualification process

    International Nuclear Information System (INIS)

    Le Ber, L.; Calmon, P.; Abittan, E.

    2001-01-01

    The CEA and EDF have started a study concerning the simulation interest in the qualification of nuclear components control by ultrasonic methods. In this framework, the simulation tools of the CEA, as CIVA, have been tested on real control. The method and the results obtained on some examples are presented. (A.L.B.)

  18. The Reliability of Results from National Tests, Public Examinations, and Vocational Qualifications in England

    Science.gov (United States)

    He, Qingping; Opposs, Dennis

    2012-01-01

    National tests, public examinations, and vocational qualifications in England are used for a variety of purposes, including the certification of individual learners in different subject areas and the accountability of individual professionals and institutions. However, there has been ongoing debate about the reliability and validity of their…

  19. Licensing requirements regarding the qualification of operating personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1981-01-01

    The legal requirements regarding the qualifications of operating personnel in nuclear power plants in the Federal Republic of Germany are outlined as in article 7 of the Atomic Energy Act. For the responsible operating personnel the requisite competence and reliability are legally required; for subordinate personnel the law requires only the necessary knowledge. The requisite competence and the necessary knowledge have been further specified in a set of guidelines by the authorities; work on specification of reliability requirements is under way. Essential elements of the requisite competence of responsible operating personnel are their professional qualification, their safety-related knowledge, their abilities, their practical experience, and - for the responsible shift personnel - their nuclear, plant-related training as well as a written and oral examination. Requalification is indispensible for keeping the requisite competence on a level in accordance with the current state of science and technology. Facts concerning the personal reliability of the responsible operating personnel are assessed by the competent authorities on the basis of information available at other state institutions. For the responsible shift personnel, physical and psychological fitness are important factors contributing to their reliability. The necessary knowledge subordinate operating personnel must possess with respect to plant safety and safety of the personnel is assured via instruction on safety and via special briefings at the working place. Lack of safety-related knowledge has to be compensated for by assigning an experienced permanent supervisor for each activity in question. Current work on qualification of operating personnel concentrates on training, including simulator training, of responsible shift personnel. (author)

  20. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  1. On-the-job training and qualification of nuclear power plant personnel. OJT at the Loviisa NPP

    International Nuclear Information System (INIS)

    1996-01-01

    On-the-job training and qualification process of nuclear power plant personnel is described, including the following issues: educational system of technical studies in Finland; training methods at the Loviisa NPP; on-the-job training of control room operators,field operators, maintenance personnel, other groups of the plant; qualifying examinations for different jobs

  2. Process qualification and testing of LENS deposited AY1E0125 D-bottle brackets

    International Nuclear Information System (INIS)

    Atwood, Clinton J.; Smugeresky, John E.; Jew, Michael; Gill, David Dennis; Scheffel, Simon

    2006-01-01

    The LENS Qualification team had the goal of performing a process qualification for the Laser Engineered Net Shaping(trademark)(LENS(reg s ign)) process. Process Qualification requires that a part be selected for process demonstration. The AY1E0125 D-Bottle Bracket from the W80-3 was selected for this work. The repeatability of the LENS process was baselined to determine process parameters. Six D-Bottle brackets were deposited using LENS, machined to final dimensions, and tested in comparison to conventionally processed brackets. The tests, taken from ES1E0003, included a mass analysis and structural dynamic testing including free-free and assembly-level modal tests, and Haversine shock tests. The LENS brackets performed with very similar characteristics to the conventionally processed brackets. Based on the results of the testing, it was concluded that the performance of the brackets made them eligible for parallel path testing in subsystem level tests. The testing results and process rigor qualified the LENS process as detailed in EER200638525A

  3. PROJECT, MANUFACTURING AND QUALIFICATION OF MACHINE TO ROTARY BENDING OF NITI SUPERELASTIC WIRES IN FATIGUE TESTS

    Directory of Open Access Journals (Sweden)

    William Marcos Muniz Menezes

    2014-03-01

    Full Text Available In this work it was developed a rotating bending apparatus for fatigue tests of superelastic NiTi wires, and other materials with high elasticity. It was evaluated the performance, robustness, operability, and reliability through testing of 1 mm thick stainless steel wires. This device is mounted on a steel frame and features semiautomatic rotation speed control, time and testing bath temperature for sample immersion. The equipment qualification tests were performed controlling the following parameters: deformation of the wire, power level and ambient temperature. The results indicated lower discrepancies for the following parameters evaluated: number of cycles in fatigue life, rotation speed, the bath temperature and arc angle of rupture. Besides the reliability, the robustness and operability of the equipment also meet the purpose of the research as evidenced by the small number of failures in the qualification tests and calibration.

  4. PULSE COMBUSTOR DESIGN QUALIFICATION TEST AND CLEAN COAL FEEDSTOCK TEST - VOLUME I AND VOLUME II; FINAL

    International Nuclear Information System (INIS)

    Unknown

    2002-01-01

    For this Cooperative Agreement, the pulse heater module is the technology envelope for an indirectly heated steam reformer. The field of use of the steam reformer pursuant to this Cooperative Agreement with DOE is for the processing of sub-bituminous coals and lignite. The main focus is the mild gasification of such coals for the generation of both fuel gas and char-for the steel industry is the main focus. An alternate market application for the substitution of metallurgical coke is also presented. This project was devoted to qualification of a 253-tube pulse heater module. This module was designed, fabricated, installed, instrumented and tested in a fluidized bed test facility. Several test campaigns were conducted. This larger heater is a 3.5 times scale-up of the previous pulse heaters that had 72 tubes each. The smaller heater has been part of previous pilot field testing of the steam reformer at New Bern, North Carolina. The project also included collection and reduction of mild gasification process data from operation of the process development unit (PDU). The operation of the PDU was aimed at conditions required to produce char (and gas) for the Northshore Steel Operations. Northshore Steel supplied the coal for the process unit tests

  5. PULSE COMBUSTOR DESIGN QUALIFICATION TEST AND CLEAN COAL FEEDSTOCK TEST - VOLUME I AND VOLUME II

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2002-02-08

    For this Cooperative Agreement, the pulse heater module is the technology envelope for an indirectly heated steam reformer. The field of use of the steam reformer pursuant to this Cooperative Agreement with DOE is for the processing of sub-bituminous coals and lignite. The main focus is the mild gasification of such coals for the generation of both fuel gas and char--for the steel industry is the main focus. An alternate market application for the substitution of metallurgical coke is also presented. This project was devoted to qualification of a 253-tube pulse heater module. This module was designed, fabricated, installed, instrumented and tested in a fluidized bed test facility. Several test campaigns were conducted. This larger heater is a 3.5 times scale-up of the previous pulse heaters that had 72 tubes each. The smaller heater has been part of previous pilot field testing of the steam reformer at New Bern, North Carolina. The project also included collection and reduction of mild gasification process data from operation of the process development unit (PDU). The operation of the PDU was aimed at conditions required to produce char (and gas) for the Northshore Steel Operations. Northshore Steel supplied the coal for the process unit tests.

  6. ITER ECRH Upper Launcher: Test plan for qualification of the Diamond Torus Window Prototype III

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Gagliardi, Mario; Saibene, Gabriella [F4E, Antennas and Plasma Engineering, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany)

    2016-11-01

    Highlights: • A qualification program for the ITER diamond torus window is being developed. • The testing program for the qualification of the bare diamond disk is defined. • First qualification tests show a very good quality of the diamond disk prototypes. - Abstract: The diamond window is part of the electron cyclotron heating upper launcher system for ITER. Together with the isolation valve it constitutes the primary vacuum boundary and it also acts as first tritium barrier. Therefore the window is classified as Safety/Protection Important Component (SIC/PIC) with the nuclear safety function “confinement”. As the diamond window unit is not entirely covered by standard codes, an ad-hoc qualification program needs to be defined, including analysis, prototyping and testing. In the framework of a contract with F4E, the test program for a diamond window prototype is being developed with the aim to prove its operability for normal, accidental and incidental conditions as identified in the ITER load specifications. Tests range from dielectric loss measurements for the bare Chemical Vapour Deposition (CVD) diamond disk up to mechanical and vacuum tests for the complete window assembly. Finally mm-wave properties have to be characterized for the complete window. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete documentation of the process. This paper will present the development of the test plan for a window prototype, which is currently under manufacturing. First tests are directed to the characterization of the bare diamond disk with a focus on its dielectric properties.

  7. Burst Test Qualification Analysis of DWPF Canister-Plug Weld

    International Nuclear Information System (INIS)

    Gupta, N.K.; Gong, Chung.

    1995-02-01

    The DWPF canister closure system uses resistance welding for sealing the canister nozzle and plug to ensure leak tightness. The welding group at SRTC is using the burst test to qualify this seal weld in lieu of the shear test in ASME B ampersand PV Code, Section IX, paragraph QW-196. The burst test is considered simpler and more appropriate than the shear test for this application. Although the geometry, loading and boundary conditions are quite different in the two tests, structural analyses show similarity in the failure mode of the shear test in paragraph QW-196 and the burst test on the DWPF canister nozzle Non-linear structural analyses are performed using finite element techniques to study the failure mode of the two tests. Actual test geometry and realistic stress strain data for the 304L stainless steel and the weld material are used in the analyses. The finite element models are loaded until failure strains are reached. The failure modes in both tests are shear at the failure points. Based on these observations, it is concluded that the use of a burst test in lieu of the shear test for qualifying the canister-plug weld is acceptable. The burst test analysis for the canister-plug also yields the burst pressures which compare favorably with the actual pressure found during burst tests. Thus, the analysis also provides an estimate of the safety margins in the design of these vessels

  8. Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

    Science.gov (United States)

    Cockrell, Charles E.; Taylor, James L.; Patterson, Alan; Stephens, Samuel E.; Tyson, Richard W.; Hueter, Uwe

    2009-01-01

    The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as

  9. Results of the PRDA 35 qualification tests of the Motorola concentrating photovoltaic module

    Energy Technology Data Exchange (ETDEWEB)

    Pritchard, D.A.

    1981-10-01

    A passively-cooled, Fresnel lens, concentrating photovoltaic module, designed and built by Motorola, Incorporated, was tested to the PRDA 35 specifications. The PRDA 35 module test program is described. Physical, electrical, and thermal characteristics of the module are presented. Module performance is shown using multiple linear regression techniques: some change was measured after environmental exposure. In addition, sample cell assemblies were evaluated for effects of severe environmental conditions. Results presented herein show the module has met the qualification goals.

  10. Qualification test of packages for transporting radioactive materials and wastes

    International Nuclear Information System (INIS)

    Oliveira Santos, P. de; Miaw, S.T.W.

    1990-01-01

    Since 1979 the Waste Treatment Division of Nuclear Tecnology Development Center has been developed and tested packagings for transporting radioactive materials and wastes. The Division has designed facilities for testing Type A packages in accordance with the adopted regulations. The Division has tested several packages for universities, research centers, industries, INB, FURNAS, etc. (author) [pt

  11. Contribution of the ultrasonic simulation to the testing methods qualification process; Contribution de la modelisation ultrasonore au processus de qualification des methodes de controle

    Energy Technology Data Exchange (ETDEWEB)

    Le Ber, L.; Calmon, P. [CEA/Saclay, STA, 91 - Gif-sur-Yvette (France); Abittan, E. [Electricite de France (EDF-GDL), 93 - Saint-Denis (France)

    2001-07-01

    The CEA and EDF have started a study concerning the simulation interest in the qualification of nuclear components control by ultrasonic methods. In this framework, the simulation tools of the CEA, as CIVA, have been tested on real control. The method and the results obtained on some examples are presented. (A.L.B.)

  12. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels; Ydinvoimalaitosten paineastioiden maeaeraeaikaistarkastuksissa kaeytettaevien NDT-jaerjestelmien paetevoeinti

    Energy Technology Data Exchange (ETDEWEB)

    Elfving, K

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included 24 refs.

  13. A study on the implementation of an integrated Environmental Qualification Management System(EQMS) for nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Bhang, Keug Jin; Jeong, Sun Chul; Kang, Pil Sun [KHNP CRI, Daejeon (Korea, Republic of)

    2012-10-15

    Environmental Qualification Management System(EQMS) for Nuclear Power Plant is a web based program for preventing degradation and managing original functions of environmental qualification equipment during nuclear power plant life cycle by inspecting and improving status of them periodically. But cognitive issues have stayed in the construction phase of EQMS: almost EQ equipment are not registered in DREAMS because the approach is not based on a standard data structure. In this study, we are to obtain the requirements of integrated EQMS by considering a standard and surveying the problems of current EQMS.

  14. A study on the implementation of an integrated Environmental Qualification Management System(EQMS) for nuclear power plant

    International Nuclear Information System (INIS)

    Bhang, Keug Jin; Jeong, Sun Chul; Kang, Pil Sun

    2012-01-01

    Environmental Qualification Management System(EQMS) for Nuclear Power Plant is a web based program for preventing degradation and managing original functions of environmental qualification equipment during nuclear power plant life cycle by inspecting and improving status of them periodically. But cognitive issues have stayed in the construction phase of EQMS: almost EQ equipment are not registered in DREAMS because the approach is not based on a standard data structure. In this study, we are to obtain the requirements of integrated EQMS by considering a standard and surveying the problems of current EQMS

  15. Seismic qualification tests of fans of the NPP of Laguna Verde U-1 and U-2; Pruebas de calificacion sismica de ventiladores de la Central Laguna Verde U1 and U2

    Energy Technology Data Exchange (ETDEWEB)

    Jarvio C, G.; Garcia H, E. E.; Arguelles F, R.; Vela H, A. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Naranjo U, J. L., E-mail: gilberto.jarvio@inin.gob.mx [Comision Federal de Electricidad, Gerencia de Centrales Nucleoelectricas, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km 7.5, Dos Bocas, Veracruz (Mexico)

    2013-10-15

    This work presents the results of the seismic qualification tests applied to the fans that will be installed in the control panels of the three divisions of the diesel generators of the nuclear power plant (NPP) of Laguna Verde, Unit-1 and Unit-2. This seismic qualification process of the fans was carried out using two specimens that were tested in the seismic table (vibrating) of the Engineering Institute of Universidad Nacional Autonoma de Mexico (UNAM), in accordance with the requirements of the standard IEEE 344-1975, to satisfy the established requirements of seismic qualification in the technical specifications and normative documents required by the nuclear standards, in order to demonstrate its application in the diesel generators Divisions I, II and III of the NPP. The seismic qualification tests were developed on specimens that were retired of the NPP of Laguna Verde recently with a service life of 7.75 years. (Author)

  16. Design and qualification testing of a strontium-90 fluoride heat source

    International Nuclear Information System (INIS)

    Fullam, H.T.

    1981-12-01

    The Strontium Heat Source Development Program began at the Pacific Northwest Laboratory (PNL) in 1972 and is scheduled to be completed by the end of FY-1981. The program is currently funded by the US Department of Energy (DOE) By-Product Utilization Program. The primary objective of the program has been to develop the data and technology required to permit the licensing of power systems for terrestrial applications that utilize 90 SrF 2 -fueled radioisotope heat sources. A secondary objective of the program has been to design and qualification-test a general purpose 90 SrF 2 -fueled heat source. The effort expended in the design and testing of the heat source is described. Detailed information is included on: heat source design, licensing requirements, and qualification test requirements; the qualification test procedures; and the fabrication and testing of capsules of various materials. The results obtained in the qualification tests show that the outer capsule design proposed for the 90 SrF 2 heat source is capable of meeting current licensing requirements when Hastelloy S is used as the outer capsule material. The data also indicate that an outer capsule of Hastelloy C-4 would probably also meet licensing requirements, although Hastelloy S is the preferred material. Therefore, based on the results of this study, the general purpose 90 SrF 2 heat source will consist of a standard WESF Hastelloy C-276 inner capsule filled with 90 SrF 2 and a Hastelloy S outer capsule having a 2.375-in. inner diameter and 0.500-in. wall thickness. The end closures for this study, the general purpose 90 SrF 2 heat a Hastelloy S outer capsule having a 2.375-in. inner diameter and 0.500-in. wall thickness. The end closures for the outer capsule will utilize an interlocking joint design requiring a 0.1-in. penetration closure weld

  17. Dynamic analysis and qualification test of nuclear components

    International Nuclear Information System (INIS)

    Kim, B.K.; Lee, C.H.; Park, S.H.; Kim, Y.M.; Kim, B.S.; Kim, I.G.; Chung, C.W.; Kim, Y.M.

    1981-01-01

    This report contains the study on the dynamic characteristics of Wolsung fuel rod and on the dynamic balancing of rotating machinery to evaluate the performance of nuclear reactor components. The study on the dynamic characteristics of Wolsung fuel rod was carried out by both experimental and theoretical methods. Forced vibration testing of actual Wolsung fuel rod using sine sweep and sine dwell excitation was conducted to find the dynamic and nonlinear characteristics of the fuel rod. The data obtained by the test were used to analyze the nonlinear impact characteristics of the fuel rod which has a motion-constraint stop in the center of the rod. The parameters used in the test were the input force level of the exciter, the clearance gap between the fuel rod and the motion constraints, and the frequencies. Test results were in good agreement with the analytical results

  18. Seismic qualification of SPX1 shutdown systems - tests and calculations

    International Nuclear Information System (INIS)

    Brochard, D.; Buland, P.

    1988-01-01

    The SUPERPHENIX 1 shutdown system is composed of two main systems: the Complementary Shutdown System SAC (Systeme d'Arret Complementaire) and the Primary Shutdown System (SCP) (Systeme de Commande Principal). In case of a seismic event, the insertability of the different shutdown systems has to be demonstrated. Tests have been performed on the SAC and have shown that this system was not sensitive to the seismic excitation (the drop time increases of 10% at SSE level). For the SCP, as an analytical demonstration was felt difficult to achieve, it was decided to perform a full scale testing program. These tests have been performed for the two types of SCP which are present in Superphenix: SCP 1 (Creusot Loire design), SCP 2 (Novatome design). As there was no existing facility in France to test this kind of slender structure (21 metres high) a new facility named VESUBIE was designed and installed in an existing pit located at the Saclay nuclear research center. The objectives of the tests were the following: to demonstrate insertability of control rod; to demonstrate absence of seismic induced damage to the SCP; to measure increase of scram time; to measure seismic induced stresses; to obtain data for code correlation. After completion of the tests, measurements have been correlated with results obtained from a non-linear finite element model. Time history correlations were achieved for SCP 1. Afterwards a calculation was performed in hot condition to find if there was some effect of temperature on SCP seismic response. 2 refs, 8 figs

  19. Data qualification summary for 1985 L-Area AC Flow Tests

    International Nuclear Information System (INIS)

    Edwards, T.B.; Eghbali, D.A.; Liebmann, M.L.; Shine, E.P.

    1992-03-01

    The 1985 L-Area AC Flow Tests were conducted to provide an extended data base for upgrading the reactor system models employed in predicting normal process water flows. This report summarizes the results of the recently completed, formal, technical review of the data from the 1985 L-Area AC Flow Tests as detailed in document SCS-CMAS-910045. The purpose of that review was to provide corroborating technical information as to the quality (fitness for use) of these experimental data. Reference [1] required three volumes to fully document the results of that Data Qualification process. This report has been prepared to provide the important conclusions from that process in a manageable and understandable format. Consult reference [1] if any additional information or detail is needed. This report provides highlights from that study: an overview of the tests and data, a description of the instrumentation used, an explanation of the data qualification methods employed to review the data, and the important conclusions reached from the study. Reference 1: Edwards, T.B., D.A. Eghbali, M.L. Liebmann, and E.P. Shine, open-quotes Data Qualification for 1985 L-Area AC Flow Tests,close quotes SCS-CMAS-910045, December 31, 1991

  20. Containment Response Analysis for Equipment Qualification of Kori Nuclear Power Plant Unit 3 and 4

    Energy Technology Data Exchange (ETDEWEB)

    Byun, Choong Sup; Song, Dong Soo; Hwang, Yong Jun [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Seo, Kwi Hyun; Song, Wan Jung [ENERGEO Inc., Sungnam (Korea, Republic of)

    2006-07-01

    Equipment that is used to perform a necessary safety function must be capable of maintaining functional operability under all service condition postulated to occur during the installed life for the time it is required. The pressure and temperature analyses for loss of coolant accident and main steam line break accident provide the bounding test envelope inside containment for the operability evaluation of safety equipment in harsh environmental. This paper describes the results of the containment pressure and temperature analysis for the equipment qualification (EQ) envelopes of Kori unit 3 and 4.

  1. A high-voltage test for the ATLAS RPC qualification

    CERN Document Server

    Aielli, G; Cardarelli, R; Di Ciaccio, A; Di Simone, A; Liberti, B; Santonico, R

    2004-01-01

    The RPC production sequence for the ATLAS experiment includes a specific test of current absorption at the operating point, which concerns the RPC "gas volumes", namely the bare detectors not yet assembled with the read-out panels and the mechanical support structures. The test, which is carried out at the production site, consists of two phases. The gas volumes are initially conditioned with pure argon, keeping the voltage constant just above the breakdown value of about 2 kV. The final test, performed after the volumes have undergone inner surface varnishing with linseed oil, is based on the measurement of the current-voltage characteristics with the binary operating gas, C//2H//2F//4/i-C//4H//1//0 = 95/5. The results presented here concern 45% of the total foreseen production.

  2. A high-voltage test for the ATLAS RPC qualification

    International Nuclear Information System (INIS)

    Aielli, G.; Camarri, P.; Cardarelli, R.; Di Ciaccio, A.; Di Simone, A.; Liberti, B.; Santonico, R.

    2004-01-01

    The RPC production sequence for the ATLAS experiment includes a specific test of current absorption at the operating point, which concerns the RPC 'gas volumes', namely the bare detectors not yet assembled with the read-out panels and the mechanical support structures. The test, which is carried out at the production site, consists of two phases. The gas volumes are initially conditioned with pure argon, keeping the voltage constant just above the breakdown value of about 2 kV. The final test, performed after the volumes have undergone inner surface varnishing with linseed oil, is based on the measurement of the current-voltage characteristics with the binary operating gas, C2H2F4/i-C4H10=95/5. The results presented here concern 45% of the total foreseen production

  3. ATLAS silicon module assembly and qualification tests at IFIC Valencia

    International Nuclear Information System (INIS)

    Bernabeu, J; Civera, J V; Costa, M J; Escobar, C; Fuster, J; Garcia, C; Garcia-Navarro, J E; Gonzalez, F; Gonzalez-Sevilla, S; Lacasta, C; Llosa, G; Marti-Garcia, S; Minano, M; Mitsou, V A; Modesto, P; Nacher, J; Rodriguez-Oliete, R; Sanchez, F J; Sospedra, L; Strachko, V

    2007-01-01

    ATLAS experiment, designed to probe the interactions of particles emerging out of proton proton collisions at energies of up to 14 TeV, will assume operation at the Large Hadron Collider (LHC) at CERN in 2007. This paper discusses the assembly and the quality control tests of forward detector modules for the ATLAS silicon microstrip detector assembled at the Instituto de Fisica Corpuscular (IFIC) in Valencia. The construction and testing procedures are outlined and the laboratory equipment is briefly described. Emphasis is given on the module quality achieved in terms of mechanical and electrical stability

  4. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    Science.gov (United States)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  5. Qualification test for the Flexible Receiver. Revision 1

    International Nuclear Information System (INIS)

    Keller, C.M.

    1994-01-01

    This document provides the test plan and procedures to certify and design verify the 42 in. and 4 in. -- 6 in. Flexible Receiver as a safety class 3 system. The Flexible Receiver will be used by projects W-151 and W-320 for removing equipment from tanks C-106 and Az-101

  6. Qualification test for the flexible receiver. Revision 2

    International Nuclear Information System (INIS)

    Tedeschi, D.J.

    1994-01-01

    This document provides the test plan and procedures to certify and design verify the 42 double-prime and 4 double-prime-6 double-prime Flexible Receiver as a safety class 3 system. The Flexible Receiver will be used by projects W-151 and W-320 for removing equipment from tanks C-106 and AZ-101

  7. Qualification test for the flexible receiver. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Tedeschi, D.J.

    1994-12-12

    This document provides the test plan and procedures to certify and design verify the 42{double_prime} and 4{double_prime}-6{double_prime} Flexible Receiver as a safety class 3 system. The Flexible Receiver will be used by projects W-151 and W-320 for removing equipment from tanks C-106 and AZ-101.

  8. Nuclear security personnel for power plants. Content and review procedures for a security training and qualification program

    International Nuclear Information System (INIS)

    1978-06-01

    The applicant and licensee training and qualification plans will outline the process by which guard, watchman, armed response persons and other members of the security organization will be selected, trained, equipped and qualified. This plan should contain: (1) job descriptions for all security positions; (2) duties defined for all positions; (3) critical tasks defined for all duties; (4) skills, knowledge and abilities defined for all critical tasks; (5) performance objectives stated for all critical tasks; and (6) training and qualification plans to train and test to appropriate performance objectives. The document gives guidance on the preparation of this training and qualification plan and contains three parts: (1) an introduction to and brief explanation of job analysis and performance objectives; (2) a statement of the information that should be submitted in response to the requirements and the NRR review procedures; and (3) a sample qualification submittal

  9. The comparison of System 1000 analysis and type testing for neoprene gasket environmental qualification

    International Nuclear Information System (INIS)

    Park, Kyung Heum; Kim, Jong Seok; Jeong, Sun Chul; Jang, Kyung Nam; Hwang, Sung Phil

    2010-01-01

    The typical environmental qualification is to ensure that equipment will operate on demand to meet system performance requirements during normal and abnormal service conditions. There are four environmental qualification methods, type testing, operating experience, analysis and combined method. Generally, the American EQ do not contain the mechanical equipment like pumps and valves in their EQ equipment list because their EQ standard 10CFR50.49 limits EQ equipment as electrical equipment. On the other hand, Canadian EQ contain the mechanical equipment like pumps and valves in their EQ components list, Canadians usually call American 'equipment' as 'components', because their EQ standard CSA N290.13-05 do not limits EQ equipment as electrical equipment. System 1000 program is typical Canadian EQ analysis method using mathematical modeling and comparison with established engineering information and manufacturers' data. Most of Canadian nuclear power utilities like NB Power, Hydro Quebec and OPG use the System 1000 program to evaluate the design life for their EQ components. To qualify a pump, I had to list all the non-metallic parts in the pump and found there are lots of gaskets made by neoprene material. I tried to qualify these neoprene gaskets by analysis using System 1000 program and by type testing. In this paper, I'd like to introduce the qualification results of neoprene gasket both type testing and analysis using System 1000 program

  10. Development and Execution of a Large-scale DDT Tube Test for IHE Material Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Parker, Gary Robert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Broilo, Robert M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lopez-Pulliam, Ian Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Vaughan, Larry Dean [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-10-24

    Insensitive High Explosive (IHE) Materials are defined in Chapter IX of the DOE Explosive Safety Standard (DOE-STD-1212-2012) as being materials that are massdetonable explosives that are so insensitive that the probability of accidental initiation or transition from burning to detonation is negligible1. There are currently a number of tests included in the standard that are required to qualify a material as IHE, however, none of the tests directly evaluate for the transition from burning to detonation (aka deflagration-to-detonation transition, DDT). Currently, there is a DOE complex-wide effort to revisit the IHE definition in DOE-STD-1212-2012 and change the qualification requirements. The proposal lays out a new approach, requiring fewer, but more appropriate tests, for IHE Material qualification. One of these new tests is the Deflagration-to-Detonation Test. According to the redefinition proposal, the purpose of the new deflagration-todetonation test is “to demonstrate that an IHE material will not undergo deflagration-to-detonation under stockpile relevant conditions of scale, confinement, and material condition. Inherent in this test design is the assumption that ignition does occur, with onset of deflagration. The test design will incorporate large margins and replicates to account for the stochastic nature of DDT events.” In short, the philosophy behind this approach is that if a material fails to undergo DDT in a significant over-test, then it is extremely unlikely to do so in realistic conditions. This effort will be valuable for the B61 LEP to satisfy their need qualify the new production lots of PBX 9502. The work described in this report is intended as a preliminary investigation to support the proposed design of an overly conservative, easily fielded DDT test for updated IHE Material Qualification standard. Specifically, we evaluated the aspects of confinement, geometry, material morphology and temperature. We also developed and tested a

  11. Inspection qualification programme for VVER reactors and review of round robin test results

    International Nuclear Information System (INIS)

    Horacek, L.; Zdarek, J.

    1998-01-01

    Experience obtained, especially from in-service inspections of VVER 440-type reactor pressure vessels and from the Czech round test trials with international participation of ultrasonic teams, has highlighted the need for an in-service inspection qualification programme in the Czech Republic focused on NDT procedures, equipment and personnel. Recently, several national and international regional projects included in the PHARE programme (projects 4.1.2/93 and 1.02/94), briefly described, have been initiated. These projects are to cover step by step the programme of the in-service inspection qualification in view of technical justification as well as of practical assessment-performance demonstration-for all the main VVER-type primary circuit components. (orig.)

  12. Generation of floor spectra compatible time histories for equipment seismic qualification in nuclear power plants

    International Nuclear Information System (INIS)

    Shyu, Y.-S.; Luh, Gary G.; Blum, Arie

    2004-01-01

    This paper proposes a procedure for generating floor response spectra compatible time histories used for equipment seismic qualification in nuclear power plants. From the 84th percentile power spectrum density function of an earthquake ensemble of four randomly generated time history motions, a statistically equivalent time history can be obtained by converting the power spectrum density function from the frequency domain into the time domain. With minor modification, if needed, the converted time history will satisfy both the spectral and the power spectrum density enveloping criteria, as required by the USNRC per Revision 2 of the Standard Review Plan, Section 3.7.1. Step-by-step generating procedures and two numerical examples are presented to illustrate the applications of the methodology. (author)

  13. The process control and management on equipment qualification of nuclear power plant

    International Nuclear Information System (INIS)

    Liu Dong; Wang Hongyin; Zhang Yong

    2013-01-01

    The equipment qualification (EQ) to the safety class equipment is an important safety measure for the nuclear power plants (NPP), and also reflects the nuclear safety culture. Along with the continuous constructions of NPP in China, it has become an important issue for NPP engineering company and equipment suppliers how to effectively establish standard EQ process control and management, and provide sufficient technical arrangements to maintain this EQ management system. This paper summarizes three process of EQ including Design Input, EQ Establishment and EQ Maintenance, proposes the measures and key points for EQ process control and management in phase of NPP construction, and introduces the documents management during the whole process of EQ. (authors)

  14. Assessment of job-related educational qualifications for nuclear power plant operators

    International Nuclear Information System (INIS)

    Saari, L.M.; Melber, B.D.; White, A.S.

    1985-04-01

    This report identifies job-related educational qualifications for the nuclear power plant licensed operator positions of reactor operator (RO), senior reactor operator (SRO), and shift supervisor (SS). The extent to which college engineering curriculum covers job-related academic knowledge was assessed. The approach used was to have subject matter experts in the field of general and nuclear engineering curriculum systematically compare college engineering program content to specific academic knowledge identified by a job analysis as necessary for licensed operators. In addition, these experts made judgments concerning levels of formal engineering education necessary for application of knowledge on the job, based on job samples from a job analysis of activities under selected normal and emergency operating sequences

  15. IEEE Std 382-1985: IEEE standard for qualification of actuators for power operated valve assemblies with safety-related functions for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the qualification of all types of power-driven valve actuators, including damper actuators, for safety-related functions in nuclear power generating stations. This standard may also be used to separately qualify actuator components. This standard establishes the minimum requirements for, and guidance regarding, the methods and procedures for qualification of power-driven valve actuators with safety-related functions Part I describes the qualification process. Part II describes the standard qualification cases and their environmental parameters for the usual locations of safety-related equipment in a nuclear generating station. Part III describes the qualification tests outlined in 6.3.3

  16. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  17. Neutron absorber qualification and acceptance testing from the designer's perspective

    Energy Technology Data Exchange (ETDEWEB)

    Bracey, W. [Transnuclear, Inc, Hawthorne, NY (United States); Chiocca, R. [Cogema Logistics, St. Quentin en Yvelines (France)

    2004-07-01

    Starting in the mid 1990's, the USNRC began to require less than 100% credit for the 10B present in fixed neutron absorbers spent fuel transport packages. The current practice in the US is to use only 75% of the specified 10B in criticality safety calculations unless extensive acceptance testing demonstrates both the presence of the 10B and uniformity of its distribution. In practice, the NRC has accepted no more than 90% credit for 10B in recent years, while other national competent authorities continue to accept 100%. More recently, with the introduction of new neutron absorber materials, particularly aluminum / boron carbide metal matrix composites, the NRC has also expressed expectations for qualification testing, based in large part on Transnuclear's successful application to use a new composite material in the TN-68 storage / transport cask. The difficulty is that adding more boron than is really necessary to a metal has some negative effects on the material, reducing the ductility and the thermal conductivity, and increasing the cost. Excessive testing requirements can have the undesired effect of keeping superior materials out of spent fuel package designs, without a corresponding justification based on public safety. In European countries and especially in France, 100% credit has been accepted up to now with materials controls specified in the Safety Analysis Report (SAR): Manufacturing process approved by qualification testing Materials manufacturing controlled under a Quality Assurance system. During fabrication, acceptance testing directly on products or on representative samples. Acceptance criteria taking into account a statistical uncertainty corresponding to 3{sigma}. The original and current bases for the reduced {sup 10}B credit, the design requirements for neutron absorber materials, and the experience of Transnuclear and Cogema Logistics with neutron absorber testing are examined. Guidelines for qualification and acceptance testing and

  18. Qualification testing facility for packages to be used for transport and storage of radioactive materials

    International Nuclear Information System (INIS)

    Vieru, Gheorghe

    2009-01-01

    The radioactive materials (RAM) packaging have to comply to all modes and transport condition, routine or in accident conditions possibly to occur during transportation operations. It is well known that the safety in the transport of RAM is dependent on packaging appropriate for the contents being shipped rather than on operational and/or administrative actions required for the package. The quality of these packages - type A, B or C has to be proved by performing qualification tests in accordance with the ROMANIAN nuclear regulation conditions provided by CNCAN Order no. 357/22.12.2005- 'Norms for a Safe Transport of Radioactive Material', the IAEA Vienna Recommendation stipulated in the Safety standard TS-R-1- Regulation for the Safe Transport of Radioactive Material, 2005 Edition, and other applicable international recommendations. The paper will describe the components of the designed testing facilities, and the qualification testing to be performed for all type A, B and C packages subjected to the testing. In addition, a part of the qualification tests for a package (designed and manufactured in INR Pitesti) used for transport and storage of spent fuel LEU elements of a TRIGA nuclear reactor will be described and analyzed. Quality assurance and quality controls measures taken in order to meet technical specification provided by the design are also presented and commented. The paper concludes that the new Romanian Testing Facilities for RAM packages will comply with the national safe standards as well as with the IAEA applicable recommendation provided by the TS-R-1 safety standard. (author)

  19. IEEE Std 600: IEEE trial-use standard requirements for organizations that conduct qualification testing of safety systems equipment for use in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The purpose of this standard is to provide requirements for establishing a program for conducting qualification tests of safety systems equipment used in nuclear power generating stations. Compliance with the requirements of this standard does not assure the adequacy of the qualification tests performed. This standard applies to organizations that conduct qualification tests on equipment that has a definable safety function and is an identifiable part of a safety system for use in nuclear power generating stations. It requires a technical program, a quality assurance program, and a demonstrated ability to meet specified technical requirements. It does not apply to materials tests, production tests, normal performance testing, qualification by analysis, qualification by operating experience, or reliability tests such as diesel-generator multiple start tests. The intent of this standard is to achieve greater consistency, reliability, and reproducibility of test results and to provide adequate control of qualification testing of safety systems equipment

  20. Europeans come together on qualification

    International Nuclear Information System (INIS)

    Whittle, J.

    1996-01-01

    Utilities operating nuclear power plants in Europe have formed the European Network for Inspection Qualification (ENIQ) to produce a common approach to demonstrating that non-destructive testing is capable providing the information to ensure the absence of significant defects in nuclear plants. Major developments over recent months have included the issue by ENIQ of a formal document defining the methodology for the conduct of qualification which sets out the principles that detailed systems, within an individual country context, should embody. A pilot study on pipe welds typical of those in BWR recirculation loops is being conducted to explore the issues involved in the practical application of the methodology. In parallel with ENIQ, the European Nuclear Regulators Working Group has set up a Task Force in an attempt to define a common regulatory position on non-destructive testing qualifications and has produced its own document which is wider in scope than that of ENIQ. (UK)

  1. Water bath and air bath calorimeter qualification for measuring 3013 containers of plutonium oxide at the Hanford Plutonium Finishing Plant (PFP)

    International Nuclear Information System (INIS)

    WELSH, T.L.

    2003-01-01

    The purpose of this paper is to present qualification data generated from water and air-bath calorimeters measuring radioactive decay heat from plutonium oxide in DOE STD-3013-2000 (3013) containers at the Hanford Plutonium Finishing Plant (PFP). Published data concerning air and water bath calorimeters and especially 3013-qualified calorimeters is minimal at best. This paper will address the data from the measurement/qualification test plan, the heat standards used, and the calorimeter precision and accuracy results. The 3013 package is physically larger than earlier plutonium oxide storage containers, thereby necessitating a larger measurement chamber. To accommodate the measurements of the 3013 containers at PFP, Los Alamos National Laboratory (LANL) supplied a water bath dual-chambered unit and the Savannah River Technology Center (SRTC) provided two air-bath calorimeters. Both types of Calorimeters were installed in the analytical laboratory at PFP. The larger 3013 containers presented a new set of potential measurement problems: longer counting times, heat conductivity through a much larger container mass and wall thickness, and larger amounts of copper shot to assist sample thermal conductivity. These potential problems were addressed and included in the measurement/qualification test plan

  2. Seismic and dynamic qualification methods

    International Nuclear Information System (INIS)

    Lin, C.W.

    1985-01-01

    This book presents the papers given at a conference on seismic effects on nuclear power plants. Topics considered at the conference included seismic qualification of equipment, multifrequency test methodologies, damping in piping systems, the amplification factor, thermal insulation, welded joints, and response factors for seismic risk analysis of piping

  3. Application of a Bayesian model for the quantification of the European methodology for qualification of non-destructive testing

    International Nuclear Information System (INIS)

    Gandossi, Luca; Simola, Kaisa; Shepherd, Barrie

    2010-01-01

    The European methodology for qualification of non-destructive testing is a well-established approach adopted by nuclear utilities in many European countries. According to this methodology, qualification is based on a combination of technical justification and practical trials. The methodology is qualitative in nature, and it does not give explicit guidance on how the evidence from the technical justification and results from trials should be weighted. A Bayesian model for the quantification process was presented in a previous paper, proposing a way to combine the 'soft' evidence contained in a technical justification with the 'hard' evidence obtained from practical trials. This paper describes the results of a pilot study in which such a Bayesian model was applied to two realistic Qualification Dossiers by experienced NDT qualification specialists. At the end of the study, recommendations were made and a set of guidelines was developed for the application of the Bayesian model.

  4. International guidance on the qualifications of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    Csik, B.J.

    1984-01-01

    Nuclear power plant operation and maintenance as well as training of operations personnel are activities where a large amount of experience is available. Though it would seem that the status of a well-established practice, requiring constant attention but no major efforts directed towards improvements, should have been reached, this is not the case. Currently, upgrading of the qualification requirements and training procedures of nuclear power plant operations personnel is a major issue and substantial efforts are being expended to this effect. The availability of international guidance in this field is perceived to be of benefit to all; therefore the Agency has undertaken to develop such guidance. In addition to earlier publications, a guidebook on this subject area is being prepared. Important problems and current issues have been identified and these are commented upon in the present paper. The specific topics referred to include: the role of the operating organization and the regulatory body; organizational aspects; staffing requirements; competence requirements for personnel; establishment and verification of competence; and personnel management. It is recognized that developing international guidance is a difficult and delicate task, especially when it is intended to go beyond stating the obvious and expressing generalities which are certain to meet a general consensus. (author)

  5. Effluent Management Facility Evaporator Bottom-Waste Streams Formulation and Waste Form Qualification Testing

    Energy Technology Data Exchange (ETDEWEB)

    Saslow, Sarah A.; Um, Wooyong; Russell, Renee L.

    2017-08-02

    This report describes the results from grout formulation and cementitious waste form qualification testing performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). These results are part of a screening test that investigates three grout formulations proposed for wide-range treatment of different waste stream compositions expected for the Hanford Effluent Management Facility (EMF) evaporator bottom waste. This work supports the technical development need for alternative disposition paths for the EMF evaporator bottom wastes and future direct feed low-activity waste (DFLAW) operations at the Hanford Site. High-priority activities included simulant production, grout formulation, and cementitious waste form qualification testing. The work contained within this report relates to waste form development and testing, and does not directly support the 2017 Integrated Disposal Facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY 2017 and future waste form development efforts. The provided results and data should be used by (1) cementitious waste form scientists to further the understanding of cementitious leach behavior of contaminants of concern (COCs), (2) decision makers interested in off-site waste form disposal, and (3) the U.S. Department of Energy, their Hanford Site contractors and stakeholders as they assess the IDF PA program at the Hanford Site. The results reported help fill existing data gaps, support final selection of a cementitious waste form for the EMF evaporator bottom waste, and improve the technical defensibility of long-term waste form risk estimates.

  6. Seismic test qualification of electrical equipment - testing methods in use to EDF

    International Nuclear Information System (INIS)

    Fabries, R.

    1981-01-01

    At the beginning, for the 900 MW Power Plant level, the testing method in application used the single axis test by sine beat of 10 cycles according to the specifications of the guide IEEE 344-71. When the french guide UTEC 20-420 came into force we have had to define another testing method (EDF standard: HN20 E52) which utilize the single-axis test either by a sine beat of 5-cycles or by a synthetized time history. We present here the mains criterions allowing to justify: -The single-axis test. The single frequency wave (when the Initial Response Spectrum (IRS) present a narrow band). The use of one sine beat of 5-cycles or one synthetized time history. The need of taking into account the high stress level. This oligocyclic stress fatigue explains why one beat of 5-cycles may be as severe as one time history of 20 seconds (with the same level of strong response spectrum). Then, we conclude that the durating of the testing wave applied to the equipment shall be considered as a relative parameter only. The weight of the SSE tests by respect to the OBE tests. The precautions to take in order to: generate and check accurately the synthetized time history, choice the test frequencies when the sine beat is used. (orig./HP)

  7. Examination of a Junction-Box Adhesion Test for Use in Photovoltaic Module Qualification: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D. C.; Wohlgemuth, J. H.

    2012-08-01

    Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development. There are historical incidences of adverse effects (e.g., fires) caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp heat' IEC qualification test is proposed to verify the basic robustness of its adhesion system. The details of the proposed test will be described, in addition to the preliminary results obtained using representative materials and components. The described discovery experiments examine moisture-cured silicone, foam tape, and hot-melt adhesives used in conjunction with PET or glass module 'substrates.' To be able to interpret the results, a set of material-level characterizations was performed, including thermogravimetric analysis, differential scanning calorimetry, and dynamic mechanical analysis. PV j-boxes were adhered to a substrate, loaded with a prescribed weight, and then placed inside an environmental chamber (at 85C, 85% relative humidity). Some systems did not remain attached through the discovery experiments. Observed failure modes include delamination (at the j-box/adhesive or adhesive/substrate interface) and phase change/creep. The results are discussed in the context of the application requirements, in addition to the plan for the formal experiment supporting the proposed modification to the qualification test.

  8. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  9. Testing and qualification of Control and Safety Rod and its drive mechanism of Fast Breeder Reactor

    International Nuclear Information System (INIS)

    Rajan Babu, V.; Veerasamy, R.; Patri, Sudheer; Ignatius Sundar Raj, S.; Kumar Krovvidi, S.C.S.P.; Dash, S.K.; Meikandamurthy, C.; Rajan, K.K.; Puthiyavinayagam, P.; Chellapandi, P.; Vaidyanathan, G.; Chetal, S.C.

    2010-01-01

    Prototype Fast Breeder Reactor (PFBR) has two independent fast acting diverse shutdown systems. The absorber rod of the first system is called Control and Safety Rod (CSR). CSR and its Drive Mechanism (CSRDM) are used for reactor control and for safe shutdown of the reactor by scram action. In view of the safety role, the qualification of CSRDM is one of the important requirements. CSR and CSRDM were qualified in two stages by extensive testing. In the first stage, the critical subassemblies of the mechanism, such as scram release electromagnet, hydraulic dashpot and dynamic seals and CSR subassembly, were tested and qualified individually simulating the operating conditions of the reactor. Experiments were also carried out on sodium vapour deposition in the annular gaps between the stationary and mobile parts of the mechanism. In the second stage, full-scale CSRDM and CSR were subjected to all the integrated functional tests in air, hot argon and subsequently in sodium simulating the operating conditions of the reactor and finally subjected to endurance tests. Since the damage occurring in CSRDM and CSR is mainly due to fatigue cycles during scram actions, the number of test cycles was decided based on the guidelines given in ASME, Section III, Div. 1. The results show that the performance of CSRDM and CSR is satisfactory. Subsequent to the testing in sodium, the assemblies having contact with liquid sodium/sodium vapour were cleaned using CO 2 process and the total cleaning process has been established, so that the mechanism can be reused in sodium. The various stages of qualification programmes have raised the confidence level on the performance of the system as a whole for the intended and reliable operation in the reactor.

  10. Regulatory analysis for resolution of Unresolved Safety Issue A-46, seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Chang, T.Y.; Anderson, N.R.

    1987-02-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform required safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants must be reassessed to determine whether requalification is necessary. The objective of technical studies performed under Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring these plants to meet the criteria that are applied to new plants. This report presents the regulatory analysis for Unresolved Safety Issue (USI) A-46. It includes: Statement of the Problem; the Objective of USI A-46; a Summary of A-46 Tasks; a Proposed Implementation Procedure; a Value-Impact Analysis; Application of the Backfit Rule; 10 CFR 50.109; Implementation; and Operating Plants To Be Reviewed to USI A-46 Requirements

  11. [The role of the basophil activation test (BAT) in qualification for specific immunotherapy with inhalant allergens].

    Science.gov (United States)

    Bulanda, Małgorzata; Dyga, Wojciech; Rusinek, Barbara; Czarnobilska, Ewa

    Qualification for specific immunotherapy (SIT) according to the guidelines of the European Academy of Allergy and Clinical Immunology (EAACI) includes medical history, skin prik tests (SPT) and/or measuring the concentration of sIgE. It is necessary to perform additional diagnostic tests in case of discrepancies between the history and the results of SPT/sIgE or differences between SPT and sIgE. Basophil activation test (BAT) assesses the expression of activation markers of these cells, eg. CD63 and CD203c after stimulation. The aim of our study was to evaluate the usefulness of BAT in the qualification for the SIT in comparison to the SPT and sIgE and in case of discrepancies between the results of SPT and sIgE. The study included 30 patients with allergic rhinitis (AR) caused by allergy to house dust mite (Dermatophagoides pteronyssinus, Dp) or birch pollen qualified for SIT. All patients had SPT, sIgE and BAT determination. The group of patients with allergy to birch was a control group for Dp allergic and vice versa. BAT with CD63 antigen expression was performed using a Flow2CAST test. Basophils were stimulated with allergen preparation (50, 500, and 5000 SBU/ml concentrations). BAT results were expressed as a stimulation index (SI). For optimal concentrations of 50 and 500 SBU/ml parameters comparing BAT to SPT and sIgE as the gold standards were consecutively: sensitivity 82-100% and 93-100%, specificity 50-94% and 47-89%, positive predictive value 65- 94% and 61-87%, negative predictive value 86-100% and 93-100%. Correlation BAT - SPT and BAT - sIgE ranged within 0.59 to 0.84 and 0.51 to 0.72. BAT was helpful in 2 of 30 patients with incompatible results of SPT and sIgE. Optimal concentrations for basophil stimulation are 50 and 500 SBU/ ml. BAT may be useful diagnostic tool in the qualification for the SIT in case of discrepancies between the results of SPT and sIgE.

  12. Safety analyses for an in-pile SCWR fuel qualification test loop

    Energy Technology Data Exchange (ETDEWEB)

    Schulenberg, T.; Raque, M. [Karlsruhe Inst. of Tech., Karlsruhe (Germany)

    2014-07-01

    As a nuclear facility cooled with supercritical water has never been built nor operated in the past, the planned SCWR fuel qualification test will give the first experience with supercritical water-cooled nuclear systems in general. With a fuel inventory of almost 1 kg of UO{sub 2} with almost 20% enrichment, the supercritical pressure test section inside a low pressure, pool type research reactor needs to be cooled properly even in case of a number of postulated design basis accidents. Depressurization systems and emergency cooling systems will need to be designed with similar reliability as for a prototype reactor to ensure the integrity of barriers retaining the radioactive material. The paper reports about the safety concept and summarizes the safety analyses which have been performed in this context. (author)

  13. Guidebook for establishing a sustainable and accredited system for qualification and certification of personnel for non-destructive testing

    International Nuclear Information System (INIS)

    2009-01-01

    Non-destructive testing (NDT) methods are used for detection, location and sizing of surface and internal defects (in welds, castings, forging, composite materials, concrete and many more). Various NDT methods are also used in preventive maintenance (nuclear power plants, aircraft, bridges, etc.). NDT methods are essential to the inspection of raw materials and half-finished products. They are applied to finished products and to in-service inspection, as well as for the design and development of new products and for plant life assessment studies. Thus NDT technology contributes significantly to the protection of life, public health and the environment through assurance of the quality and integrity of critical equipment and facilities. It is especially important in the developing Member States where the consequences of failure may be particularly severe, resulting in social, financial and environmental impacts. The IAEA has supported developing Member States for capacity building in utilization of NDT technology by providing experts, equipment, training opportunities and scientific visits. It was recognized early that NDT operator qualification and certification deserved special attention as the Member States began to apply NDT technology to local industrial problems. A series of meetings, workshops and publications have been dedicated to this issue. These efforts have led to a stage of maturity and self-sufficiency in many countries, especially in the field of training and certification of personnel, and in the provision of services to industries. ISO 9712, the international standard for qualification and certification of NDT personnel, has been adopted as the cornerstone for carrying out the training and certification activities. In 2005, a revised version of the standard, ISO 9712:2005, was published. There are some significant differences in this standard from previous editions, particularly in reference to an accreditation standard, ISO/IEC 17024:2003 (2003

  14. On-the-job training and qualification of nuclear power plant personnel. Proceedings of a specialists' meeting. Working material

    International Nuclear Information System (INIS)

    1996-01-01

    The topic of this meeting , on-the-job training, was selected by the International Working Group on Training and Qualification of Nuclear Power Plant Personnel, during their most recent meeting in 1994. This International Working Group is made up of representatives from all Member States who have operating nuclear power plants. This Group felt that there was a need to provide a forum for exchange of information among specialists from Member States on the topic of on-the-job training, and further that the Agency should publish the proceedings of this meeting for the use of those specialists who were not able to attend. Refs, figs, tabs

  15. Development and qualification of functional materials for the EU Test Blanket Modules: Strategy and R and D activities

    Energy Technology Data Exchange (ETDEWEB)

    Zmitko, M., E-mail: milan.zmitko@f4e.europa.eu [Fusion for Energy (F4E), 08019 Barcelona (Spain); Poitevin, Y. [Fusion for Energy (F4E), 08019 Barcelona (Spain); Boccaccini, L., E-mail: lorenzo.boccaccini@inr.fzk.de [Institut Fuer Neutronenphysik und Reaktortechnik, FZK, D-76021 Karlsruhe (Germany); Salavy, J.-F., E-mail: jfsalavy@cea.fr [CEA/Saclay, DEN/DM2S, F-91191 Gif-sur-Yvette (France); Knitter, R., E-mail: regina.knitter@imf.fzk.de [Institut Fuer Materialforschung III, FZK, D-76021 Karlsruhe (Germany); Moeslang, A., E-mail: anton.moeslang@imf.fzk.de [Institut Fuer Materialforschung I, FZK, D-76021 Karlsruhe (Germany); Magielsen, A.J., E-mail: magielsen@nrg.eu [NRG Petten, 1755 ZG Petten (Netherlands); Hegeman, J.B.J. [NRG Petten, 1755 ZG Petten (Netherlands); Laesser, R. [Fusion for Energy (F4E), 08019 Barcelona (Spain)

    2011-10-01

    Europe has developed two reference tritium breeder blankets concepts for a DEMO fusion reactor: the Helium-Cooled Lithium-Lead and the Helium-Cooled Pebble-Bed. Both will be tested in ITER under the form of Test Blanket Modules (TBMs). The paper reviews the current status of development and qualification of the EU TBMs functional materials; i.e. ceramic solid breeder materials, beryllium/beryllides multiplier materials and Lithium-Lead liquid metal breeder material Pb-15.7Li. For each functional material the main functional/performance requirements with key qualification issues, current status of the R and D activities and the EU development strategy are presented. In the development strategy major steps considered are listed pointing out importance of the 'Development/qualification/procurement plan', currently under elaboration, for definition of a roadmap of further activities aiming at delivery of qualified functional materials to be used in the European TBMs in ITER.

  16. Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Thomas J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howard, Richard H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Rader, Jordan D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examination facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.

  17. Hanford Waste Vitrification Plant Quality Assurance Program description for defense high-level waste form development and qualification

    International Nuclear Information System (INIS)

    Hand, R.L.

    1992-01-01

    This document describes the quality assurance (QA) program of the Hanford Waste Vitrification Plant (HWVP) Project. The purpose of the QA program is to control project activities in such a manner as to achieve the mission of the HWVP Project in a safe and reliable manner. A major aspect of the HWVP Project QA program is the control of activities that relate to high-level waste (HLW) form development and qualification. This document describes the program and planned actions the Westinghouse Hanford Company (Westinghouse Hanford) will implement to demonstrate and ensure that the HWVP Project meets the US Department of Energy (DOE) and ASME regulations. The actions for meeting the requirements of the Waste Acceptance Preliminary Specifications (WAPS) will be implemented under the HWVP product qualification program with the objective of ensuring that the HWVP and its processes comply with the WAPS established by the federal repository

  18. Dynamic testing of nuclear power plant structures: an evaluation

    International Nuclear Information System (INIS)

    Weaver, H.J.

    1980-02-01

    Lawrence Livermore Laboratory (LLL) evaluated the applications of system identification techniques to the dynamic testing of nuclear power plant structures and subsystems. These experimental techniques involve exciting a structure and measuring, digitizing, and processing the time-history motions that result. The data can be compared to parameters calculated using finite element or other models of the test systems to validate the model and to verify the seismic analysis. This report summarizes work in three main areas: (1) analytical qualification of a set of computer programs developed at LLL to extract model parameters from the time histories; (2) examination of the feasibility of safely exciting nuclear power plant structures and accurately recording the resulting time-history motions; (3) study of how the model parameters that are extracted from the data be used best to evaluate structural integrity and analyze nuclear power plants

  19. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    International Nuclear Information System (INIS)

    Banetta, S.; Bellin, B.; Lorenzetto, P.; Zacchia, F.; Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P.; Mitteau, R.; Eaton, R.; Raffray, R.; Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T.

    2015-01-01

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m"2). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m"2 show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m"2 is described in detail.

  20. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    Energy Technology Data Exchange (ETDEWEB)

    Banetta, S., E-mail: stefano.banetta@f4e.europa.eu [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Bellin, B.; Lorenzetto, P.; Zacchia, F. [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P. [AREVA NP PTCMI-F, Centre Technique, Fusion, 71200 Le Creusot (France); Mitteau, R.; Eaton, R.; Raffray, R. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T. [Forschungszentrum Jülich, Institute of Energy and Climate Research, Jülich (Germany)

    2015-10-15

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m{sup 2}). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m{sup 2} show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m{sup 2} is described in detail.

  1. EUCLID/NISP GRISM qualification model AIT/AIV campaign: optical, mechanical, thermal and vibration tests

    Science.gov (United States)

    Caillat, A.; Costille, A.; Pascal, S.; Rossin, C.; Vives, S.; Foulon, B.; Sanchez, P.

    2017-09-01

    Dark matter and dark energy mysteries will be explored by the Euclid ESA M-class space mission which will be launched in 2020. Millions of galaxies will be surveyed through visible imagery and NIR imagery and spectroscopy in order to map in three dimensions the Universe at different evolution stages over the past 10 billion years. The massive NIR spectroscopic survey will be done efficiently by the NISP instrument thanks to the use of grisms (for "Grating pRISMs") developed under the responsibility of the LAM. In this paper, we present the verification philosophy applied to test and validate each grism before the delivery to the project. The test sequence covers a large set of verifications: optical tests to validate efficiency and WFE of the component, mechanical tests to validate the robustness to vibration, thermal tests to validate its behavior in cryogenic environment and a complete metrology of the assembled component. We show the test results obtained on the first grism Engineering and Qualification Model (EQM) which will be delivered to the NISP project in fall 2016.

  2. Reliability Testing Beyond Qualification as a Key Component in Photovoltaic's Progress Toward Grid Parity: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Wohlgemuth, J. H.; Kurtz, S.

    2011-02-01

    This paper discusses why it is necessary for new lower cost PV modules to be tested using a reliability test sequence that goes beyond the Qualification test sequence now utilized for modules. Today most PV modules are warranted for 25 years, but the Qualification Test Sequence does not test for 25-year life. There is no accepted test protocol to validate a 25-year lifetime. This paper recommends the use of long term accelerated testing to compare now designs directly with older designs that have achieved long lifetimes in outdoor exposure. If the new designs do as well or better than the older ones, then it is likely that they will survive an equivalent length of time in the field.

  3. Seismic analysis and testing of nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    The following subjects are discussed in this guide: General Recommendations for seismic classification, loading combinations and allowable limits; seismic analysis methods; implications for seismic design; seismic testing and qualification; seismic instrumentation; modelling techniques; material property characterization; seismic response of soil deposits and earth structures; liquefaction and ground failure; slope stability; sloshing effects in water pools; qualification testing by means of the transport vehicle

  4. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  5. Development and Realization of a Shock Wave Test on Expert Flap Qualification Model

    Science.gov (United States)

    De Fruytier, C.; Dell'Orco, F.; Ullio, R.; Gomiero, F.

    2012-07-01

    This paper presents the methodology and the results of the shock test campaign conducted by TAS-I and TAS ETCA to qualify the EXPERT Flap in regards of shock wave and acoustic load generated by pyrocord detonation at stages 2/3 separation phase of the EXPERT vehicle. The design concept of the open flap (manufactured by MT AEROSPACE) is a fully integral manufactured, four sided control surface, with an additional stiffening rib and flanges to meet the first eigenfrequency and the allowable deformation requirement with a minimum necessary mass. The objectives were to reproduce equivalent loading at test article level in terms of pulse duration, front pressure, front velocity and acoustic emission. The Thales Alenia Space ETCA pyrotechnic shock test device is usually used to produce high level shocks by performing a shock on a test fixture supporting the unit under test. In this case, the facility has been used to produce a shock wave, with different requested physical characteristics, directed to the unit under test. Different configurations have been tried on a dummy of the unit to test, following an empirical process. This unusual work has lead to the definition of a nominal set- up meeting the requested physical parameters. Two blast sensors have been placed to acquire the pressure around the flap. The distance between the two sensors has allowed estimating the front pressure velocity. Then, several locations have been selected to acquire the acceleration responses on the unit when it was submitted to this environment. Additionally, a “standard” shock test has been performed on this model. The qualification of the flap, in regards of shock environment, has been successfully conducted.

  6. The role and responsibilities of management for the training and qualification of nuclear power plant personnel

    International Nuclear Information System (INIS)

    Mautner Markhof, F.

    1998-01-01

    The aim of this paper is to provide management-level personnel with an overview and understanding of their main role and responsibilities related to training, competence and qualification of NPP personnel. It addresses the responsibilities of various levels of management personnel, emphasizing performance excellence and effective management through successful dealing with key issues and problems

  7. Qualification of Electrical Equipment in Nuclear Power Plants - Management of ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2013-02-01

    The purpose of this report is to describe programs and tools for assessment of accomplished and documented qualification with respect to ageing of electrical equipment and for development of complimentary ageing management programs. In addition to description of complete programs for management of ageing, tools for validation of the status with regard to ageing of installed ('old') equipment and, where needed, for complementation of their qualification are also included. The report is restricted to safety related equipment containing ageing sensitive parts, mainly organic materials. To this category belong cables and cable joints and a number of equipment containing oils, seals (o-rings), etc. For equipment located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. The main part of this report deals with the qualification of such equipment. Some safety related equipment outside the containment can be located in areas where they are subjected to high temperature and other excessive environmental stresses during normal operation and in areas affected by an accident. Therefore, some material is given also on qualification of equipment located outside containment with better possibilities for frequent inspection and supervision. Part 1 of the report is an executive summary with a general review of the methodologies and their application. The more detailed description of the programs and underlying material, useful data, etc. is given in Part 2

  8. Nuclear power plant personnel qualifications and training: TAPS: the task analysis profiling system. Volume 2

    International Nuclear Information System (INIS)

    Jorgensen, C.C.

    1985-06-01

    This report discusses an automated task analysis profiling system (TAPS) designed to provide a linking tool between the behaviors of nuclear power plant operators in performing their tasks and the measurement tools necessary to evaluate their in-plant performance. TAPS assists in the identification of the entry-level skill, knowledge, ability and attitude (SKAA) requirements for the various tasks and rapidly associates them with measurement tests and human factors principles. This report describes the development of TAPS and presents its first demonstration. It begins with characteristics of skilled human performance and proceeds to postulate a cognitive model to formally describe these characteristics. A method is derived for linking SKAA characteristics to measurement tests. The entire process is then automated in the form of a task analysis computer program. The development of the program is detailed and a user guide with annotated code listings and supporting test information is provided

  9. ITER ECRH upper launcher torus diamond window – Prototyping, testing and qualification

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Ikeda, Ryosuke; Oda, Yasuhisa; Sakamoto, Keishi; Takahashi, Koji [Japan Atomic Energy Agency (JAEA), Plasma Heating Technology Group, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany)

    2015-10-15

    Highlights: • The diamond window prototype shows a very good transmission capability during high power RF experiments. • An ad-hoc qualification programme for the diamond torus window is being developed (contract between KIT and F4E). • The window design has been updated focused on its mechanical integrity and manufacturing aspects. - Abstract: The diamond window assembly is part of the ITER primary vacuum boundary and acts as the first tritium barrier and therefore it is classified as Safety/Protection Important Component (SIC/PIC). It consists of an ultra-low loss CVD diamond disk mounted in a system of metallic parts (copper/steel) and has to fulfil adequate transmission capability for high power mm-waves. High power RF experiments with a 1st window prototype had shown parasitic heating due to small gaps in the housing. After a design optimization directed to the mm-wave properties, the parasitic excitations of oscillations have been avoided in a 2nd prototype. This one is equipped with inserted waveguide structures, which cover gaps in the metallic structure of the window housing. From high power RF-measurements with a 0.86 MW/100 s pulse a loss tangent of 7.1 × 10{sup −6} could be estimated, corresponding to an increase of temperature of only 120 mK between inlet and outlet of the cooling system. The diamond window assemblies cannot be entirely covered by codes and standards. To comply with the French safety regulations, instead an ad-hoc qualification programme is required, being developed in the framework of a contract between KIT and F4E. A new prototype (3rd) will be built, which is designed to fit to the single HELICOFLEX sealed waveguide structures of the ex-vessel mm-system of the EC upper launcher (UL). The testing programme ranges from mechanical to vacuum tests up to dielectric loss measurements at low and high power. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete

  10. Guidelines for Electromagnetic Interference Testing of Power Plant Equipment: Revision 3 to TR-102323

    Energy Technology Data Exchange (ETDEWEB)

    J. Cunningham and J. Shank

    2004-11-01

    To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I&C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner.

  11. Guidelines for Electromagnetic Interference Testing of Power Plant Equipment: Revision 3 to TR-102323

    International Nuclear Information System (INIS)

    Cunningham, J.; Shank, J.

    2004-01-01

    To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I and C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner

  12. Investgation concerning the structure, critical analysis and improvement of the organization of quality assurance in the qualification of electrical equipment for nuclear power plants with new parts and in-service inspections

    International Nuclear Information System (INIS)

    1985-01-01

    The study gives a survey of methods for the qualification of electrical equipment for nuclear power plants presently applied in the Federal Republic of Germany full consideration being given to the organization of quality assurance on the premises of the organizations involved (operators, plant suppliers, manufacturers). The organization of the qualification is to be kept distinct from the technical execution of the qualification. The qualification procedures are compared to those applied in France and in the USA. Aspects of future developments are shown with are promising with respect to: an increase in safety of electrical equipment for nuclear power plants, a simplification of the licencing procedure under Atomic Law. (orig./HP) [de

  13. BWR reactor water cleanup system flexible wedge gate isolation valve qualification and high energy flow interruption test

    International Nuclear Information System (INIS)

    DeWall, K.G.; Steele, R. Jr.

    1989-10-01

    This report presents the results of research performed to develop technical insights for the NRC effort regarding Generic Issue 87, ''Failure of HPCI Steam Line Without Isolation.'' Volume III of this report contains the data and findings from the original research performed to assess the qualification of the valves and reported in EGG-SSRE-7387, ''Qualification of Valve Assemblies in High Energy BWR Systems Penetrating Containment.'' We present the original work here to complete the documentation trail. The recommendations contained in Volume III of this report resulted in the test program described in Volume I and II. The research began with a survey to characterize the population of normally open containment isolation valves in those process lines that connect to the primary system and penetrate containment. The qualification methodology used by the various manufacturers identified in the survey is reviewed and deficiencies in that methodology are identified. Recommendations for expanding the qualification of valve assemblies for high energy pipe break conditions are presented. 11 refs., 1 fig., 2 tabs

  14. FPGA and Software Design for the Qualification and Automated tests for the production of CERN Digital Acquisition Boards

    CERN Document Server

    Laroussi, H; Lefevre, T; Degeest, A; Garcia, S; Tichon, J

    The VFC-HPC is an FPGA-based multipurpose board designed to be the new standard back-end for the Beam Instrumentation (BI) Group. This contribution is aimed to give a presentation of the test and qualification system designed to be used to verify the compliance of the VFC-HPC to the specifications. We will begin by presenting the CERN, the company, its main purpose and its brief history. Afterward, we will present the VFC-HPC, the purpose of this board and its mains characteristics. We will then focus on the work done to allow the test and qualification of the VFC-HPC. This project was focused on the test and qualification of the connectivity of the board, consisting of the FMC Connector and the SFPs. This work involved making several market surveys to choose the proper test components to be used (as FMC Mezzanines), setting up a test bench, implementing optical communications through SFPs, writing Verilog firmwares, writing software test routines in Python and measuring Bit Error Rates (BER) and eye diagrams...

  15. Test Report of Special Form Qualification Testing for the ORNL U ZipCan

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Oscar A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    This test report describes the special form testing activities performed on the two ZiPCans. One prototype test unit was subjected to the tests stipulated by 10 CFR 71.75 (d)(1)(i), ISO 2919:1999(E) Class 4 impact test, along with the leak rate test specified in 49 CFR 173.469(a)(4)(i). The other test unit was subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469 (b)(4). Each test unit was leak tested before and after these respective tests. The leak rate tests performed were helium back-pressure tests and bubble tests, as specified in ANSI N14.5-2014.The measured leak rates were converted to standard condition leak rates as specified in ASTM E 493. The determined standardized leak rates from the test and calculation for both test units met the requirements for special form certification.

  16. Specification for self contained emergency luminiare and their qualification for a nuclear power plant

    International Nuclear Information System (INIS)

    Srinivasan, R.; Shanmugam, T.K.

    1999-01-01

    Self contained emergency luminiare (SCEL) for application in a nuclear plant shall meet the illumination level requirement of ANSI/NFPA 101-1988 (Life Safety Code) Section 5.8. The testing shall be done as per IS 9583-1981 requirements. In the selection of self contained emergency luminiare the Sealed Maintenance Free (SMF) battery characteristic and Ampere-Hour ratings are to be carefully evaluated

  17. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  18. Total qualification of class 1E electric equipment

    International Nuclear Information System (INIS)

    Chauvin, G.

    1982-09-01

    For nuclear power plant projects in France, Framatome and its partners Electricite de France (EDF) and the Commissariat a l'Energie Atomique (CEA) have responded to the present qualification context by implementing a wide-ranging qualification program to acquire significant organizational and practical experience. The following sections detail Framatome's approach to the activities of an organization mandated to provide a complete spectrum of qualification services. Thorough implementation of a Class 1E electric equipment qualification program by the competent organization or qualifier entails completion of three consecutive steps: 1) program preparation, 2) program implementation, and 3) analysis of test results and conclusion. The qualifier assumes extensive responsibility for each of these steps. The following sections present test facilities used in France to conduct a total qualification program for Class 1E electric equipment

  19. Qualification test of a MPPC-based PET module for future MRI-PET scanners

    Science.gov (United States)

    Kurei, Y.; Kataoka, J.; Kato, T.; Fujita, T.; Funamoto, H.; Tsujikawa, T.; Yamamoto, S.

    2014-11-01

    We have developed a high-resolution, compact Positron Emission Tomography (PET) module for future use in MRI-PET scanners. The module consists of large-area, 4×4 ch MPPC arrays (Hamamatsu S11827-3344MG) optically coupled with Ce:LYSO scintillators fabricated into 12×12 matrices of 1×1 mm2 pixels. At this stage, a pair of module and coincidence circuits was assembled into an experimental prototype gantry arranged in a ring of 90 mm in diameter to form the MPPC-based PET system. The PET detector ring was then positioned around the RF coil of the 4.7 T MRI system. We took an image of a point 22Na source under fast spin echo (FSE) and gradient echo (GE), in order to measure interference between the MPPC-based PET and the MRI. We only found a slight degradation in the spatial resolution of the PET image from 1.63 to 1.70 mm (FWHM; x-direction), or 1.48-1.55 mm (FWHM; y-direction) when operating with the MRI, while the signal-to-noise ratio (SNR) of the MRI image was only degraded by 5%. These results encouraged us to develop a more advanced version of the MRI-PET gantry with eight MPPC-based PET modules, whose detailed design and first qualification test are also presented in this paper.

  20. Qualification testing program plan for SIMMER. A computer code for LMFBR disrupted core analysis

    International Nuclear Information System (INIS)

    Basdekas, D.L.; Silberberg, M.; Curtis, R.T.; Kelber, C.N.

    1978-07-01

    The objective of SIMMER qualification testing program is to assure that the mathematical models and input parameters are derived from experimental data, which, on the basis of criteria still to be established, are representative of the phenomena and processes governing the progression of a CDA in an LMFBR. At the present time, the work to meet this objective can be classified into three general task areas as they relate to the use of SIMMER in CDA analysis: (1) The whole-core energetic disassembly accident, or the ''vessel problem'': The objective here is to predict the partition of the total energy release, by a postulated severe power excursion, between the primary containment and the energy absorbed through nondestructive dissipative processes. (2) Single subassembly accident: The objective here is to determine the pertinent phenomena and to develop the capability to assess the significance and likelihood that such accidents might propagate to involvement of larger fraction of the core. (3) The whole-core transition phase accident: The objective here is to advance the understanding of the phenomena and processes involved, so that reliable predictions can be made of the possible consequences of a CDA and the potential for further nuclear excursions through recriticality

  1. Guidebook on training to establish and maintain the qualification and competence of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1994-03-01

    Since the IAEA published its Guidebook on the Qualification of Nuclear Power Plant Operations Personnel in 1984 (Technical Reports Series 242) there have been important developments in the approach to training adopted by many operating organizations in different countries. It is now accepted that developing training programmes based solely on experience is inappropriate for the nuclear power industry, and that a systematic approach to training is necessary. It has been recognized that inadequate knowledge and skills may lead to human errors, and it is therefore necessary to review and improve the development and implementation of initial and continuing training programmes. The present Guidebook proposes an approach which is comprehensive and systematic in its methodology and also cost effective in its implementation. This Guidebook is mainly intended for management and training staff of nuclear power plant operating organizations. Relevant examples of current training practices are presented in the Appendices, which constitute an integral part of the Guidebook. Ref, figs and tabs

  2. Guidebook on training to establish and maintain the qualification and competence of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1989-11-01

    Since the IAEA published its Guidebook on the Qualification of Nuclear Power Plant Operations Personnel in 1984 (Technical Reports Series 242) there have been important developments in the approach to training adopted by many operating organizations in different countries. It is now accepted that developing training programmes based solely on experience is inappropriate for the nuclear power industry, and that a systematic approach to training is necessary. It has been recognized that inadequate knowledge and skills may lead to human errors, and it is therefore necessary to review and improve the development and implementation of initial and continuing training programmes. The present Guidebook proposes an approach which is comprehensive and systematic in its methodology and also cost effective in its implementation. This Guidebook is mainly intended for management and training staff of nuclear power plant operating organizations. Relevant examples of current training practices are presented in the Appendices, which constitute an integral part of the Guidebook. Refs, figs and tabs

  3. Molding compound trends in a denser packaging world: Qualification tests and reliability concerns

    Science.gov (United States)

    Nguyen, L. T.; Lo, R. H. Y.; Chen, A. S.; Belani, J. G.

    1993-12-01

    Molding compound development has traditionally been driven by the memory market, then subsequent applications filter down to other IC technologies such as logic, analog, and ASIC. However, this strategy has changed lately with the introduction of thin packages such as PQFP & TSOP. Rather than targeting a compound for a family of IC such as DRAM or SRAM, compound development efforts are now focused at specific classes of packages. The configurations of these thin packages impose new functional requirements that need to be revisited to provide the optimized combination of properties. The evolution of qualification tests mirrors the advances in epoxy and compounding technologies. From the first standard novolac-based epoxies of the 1970s to the latest 3(sup rd)-generation ultra-low stress materials, longer test times at increasingly harsher environments were achieved. This paper benchmarks the current reliability tests used by the electronic industry, examines those tests that affect and are affected by the molding compounds, discusses the relevance of accelerated testing, and addresses the major reliability issues facing current molding compound development efforts. Six compound-related reliability concerns were selected: moldability, package stresses, package cracking, halogen-induced intermetallic growth at bond pads, moisture-induced corrosion, and interfacial delamination. Causes of each failure type are surveyed and remedies are recommended. Accelerated tests are designed to apply to a limited quantity of devices, bias, or environmental conditions larger than usual ratings, to intensify failure mechanisms that would occur under normal operating conditions. The observed behavior is then extrapolated from the lot to the entire population. Emphasis is on compressing the time necessary to obtain reliability data. This approach has two main drawbacks. With increasingly complex devices, even accelerated tests are expensive. And with new technologies, it becomes

  4. BWR Full Integral Simulation Test (FIST) Phase II test results and TRAC-BWR model qualification

    International Nuclear Information System (INIS)

    Sutherland, W.A.; Alamgir, M.; Findlay, J.A.; Hwang, W.S.

    1985-10-01

    Eight matrix tests were conducted in the FIST Phase I. These tests investigated the large break, small break and steamline break LOCA's, as well as natural circulation and power transients. There are nine tests in Phase II of the FIST program. They include the following LOCA tests: BWR/6 LPCI line break, BWR/6 intermediate size recirculation break, and a BWR/4 large break. Steady state natural circulation tests with feedwater makeup performed at high and low pressure, and at high pressure with HPCS makeup, are included. Simulation of a transient without rod insertion, and with controlled depressurization, was performed. Also included is a simulation of the Peach Bottom turbine trip test. The final two tests simulated a failure to maintain water level during a postulated accident. A FIST program objective is to assess the TRAC code by comparisons with test data. Two post-test predictions made with TRACB04 are compared with Phase II test data in this report. These are for the BWR/6 LPCI line break LOCA, and the Peach Bottom turbine trip test simulation

  5. Simulating Large Area, High Intensity AM0 Illumination – Test Results from Bepicolombo and Solar Orbiter Qualification

    Directory of Open Access Journals (Sweden)

    Oberhüttinger C.

    2017-01-01

    Specifically, the following topics will be treated. Different methods like electrical performance, thermo-optical and external quantum efficiency measurements have been used to characterize the behaviour of the solar cells after illumination under these conditions. A special focus has been put on the electrical performance. A comparison to other solar cell qualification tests under solely UV radiation has been undertaken. The results have also been compared to a theoretical model. However, the paper will not cover only characterization results but will also give some insight in challenges experienced during the test execution itself. Deviating from other solar cell qualification tests, a representatively equipped photovoltaic assembly on carbon fibre reinforced cyanate has also been included. On these coupon segments, solar cell assemblies connected to shunt diodes and placed next to optical surface reflectors have been exposed to AM0 illumination to qualify the solar cells including their surroundings which therefore covers also contamination effects. Last but not least, first results from the Solar Orbiter qualification are presented. This test with additional 1000 hours and increased intensity has been completed recently.

  6. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  7. Qualification testing of fiber-based laser transmitters and on-orbit validation of a commercial laser system

    Science.gov (United States)

    Wright, M. W.; Wilkerson, M. W.; Tang, R. R.

    2017-11-01

    Qualification testing of fiber based laser transmitters is required for NASA's Deep Space Optical Communications program to mature the technology for space applications. In the absence of fully space qualified systems, commercial systems have been investigated in order to demonstrate the robustness of the technology. To this end, a 2.5 W fiber based laser source was developed as the transmitter for an optical communications experiment flown aboard the ISS as a part of a technology demonstration mission. The low cost system leveraged Mil Standard design principles and Telcordia certified components to the extent possible and was operated in a pressure vessel with active cooling. The laser was capable of high rate modulation but was limited by the mission requirements to 50 Mbps for downlinking stored video from the OPALS payload, externally mounted on the ISS. Environmental testing and space qualification of this unit will be discussed along with plans for a fully space qualified laser transmitter.

  8. Similarity principles for seismic qualification of equipment by experience data

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1989-01-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data is that available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application and verification of the procedures are given for actual test data available from previous qualifications. The developments are intended to elaborate on the rather broad guidelines by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. The results also contribute to filling a gap that exists between the IEEE 344 methodology and that which was previously developed for equipment in existing plants by the Seismic Qualification Utilities Group. 10 refs., 9 figs., 1 tab

  9. Inspection qualification and implementation of ENIQ in Sweden

    International Nuclear Information System (INIS)

    Zettervall, Tommy

    2013-01-01

    Many countries are currently considering their approaches to inspection qualification and risk-informed in-service inspection (RI-ISI) and are carefully assessing experience data. In Europe most of the utilities operating nuclear power plants have joined together to form the European Network for Inspection Qualification ENIQ. In practice, qualification can be performed with varying degrees of complexity and cost, varying from capability statement based on existing evidence, through to an extensive qualification consisting of a detailed Technical Justification (TJ) together with open and blind trials on full-scale test blocks. An Inspection Qualification is an investigation and demonstration, which confirm that an inspection system has the ability to solve its specific tasks. The qualification is a Quality Assurance of an inspection system based on documents and practical trials. A reliable inspection system, based on a reliable qualification and correct prerequisites, will reduce total costs for Licensees and increase the credibility of the inspection result. To get such inspection system, which could be valid for many years, it's of necessity to fulfil all included parts in the process. It begins with the Technical Specification from Licensee, where input data and requirements about the actual component are specified. To get an inspection system that could live over time, the Technical Justification is of importance. Finally the test blocks and used simulation techniques play an important part of the final result, and these test blocks together with TJ form the basis for qualification body's decision. (author)

  10. Monitoring of biogas test plants

    DEFF Research Database (Denmark)

    Holm-Nielsen, Jens Bo; Esbensen, Kim H.

    2011-01-01

    realistic bioreactor scales, it is necessary to obtain a fairly constant level of volatile fatty acid (VFA) concentration, which furthers a stable biogas production. Uncontrolled VFA contents have a significant negative impact on biogas production; VFA concentrations should not exceed 5–6000 mg/L lest......Most studies reported in the literature have investigated near infrared spectroscopy (NIR) in laboratory-scale or minor pilot biogas plants only; practically no other studies have examined the potential for meso-scale/full-scale on-line process monitoring. The focus of this study is on a meso......-scale biogas test plant implementation of process analytical technologies (PAT) to develop multivariate calibration/prediction models for anaerobic digestion (AD) processes. A 150 L bioreactor was fitted with a recurrent loop at which NIR spectroscopy and attendant reference sampling were carried out. In all...

  11. The status of Nuclear Power Plant personnel training and qualification in Hungary, 2002

    International Nuclear Information System (INIS)

    Kiss, I.

    2003-01-01

    In recent years, Hungary has experienced a stable and smooth economic development. The country is prepared and looking forward to the accession to the EU, political stability characterizes public life and decreasing inflation unemployment rate are typical to the domestic market. In this context, the energy demand increases in a slow but steady rate. From the beginning of 2003, large customers will have been given the freedom to procure electric energy from the liberal world market. The life extension of NPPs lays significant emphasis on the thoughtful management of the human resources. Currently, the mean age of the plant personnel is 46 years and the age distribution reflects that the core of the plant staff is yet composed of professionals having worked for the plant since the very beginning. In 2000, the plant's Human Resources Division, for excellence in HRM, commenced the establishment of an integrated human resource management system for a new organizational structure. The management of the previously mentioned, already realized technical and human changes, as well as of the challenges of the future put the in-site training organization on the test. For this, a good basis is ensured by the training developments in the training infrastructure, methodology and staff, accomplished in the period between 1994-1998 - primarily in frame of the Hungarian Model Project. Today the Training Department, subordinated to the Human Resources Division, works with 70 persons out of which 25 instructors perform skills and technological training activities. The instructor staff partly imported from maintenance and operations areas and partly developed from young university graduates successfully managed with the training tasks associated with the grand plant reconstruction programs. The professional and age composition of the instructors allow for a smooth transition and transfer of knowledge and experience accumulated at the plant as well as for the apprehension of new

  12. Development of methods for nuclear power plant personnel qualifications and training

    International Nuclear Information System (INIS)

    Jorgensen, C.C.; Carter, R.J.

    1984-01-01

    The Nuclear Regulatory Commission (NRC) has proposed additions and revisions to Title 10 of the Code of Federal Regulations, Parts 50 and 55, and to Regulatory Guides 1.8 and 1.149. ORNL is developing methods and some aspects of the technical basis for the implementation and assessment of training programs, personnel qualifications, and simulation facilities. The paper describes the three methodologies which were developed during the FY-1984 research: a task sort procedure (TSORT); a simulation facility evaluation methodology; and a task analysis profiling system (TAPS)

  13. Test plan for qualification testing of the 241-SY-101 Flexible Receiver System

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    A mixer pump was installed in tank 241-SY-101 on July 3, 1993, to support hydrogen mitigation testing. This test mixer pump has proven to be very successful in mitigating the large gas releases, or ''burps,'' from the tank waste. Therefore, a decision has been made to fabricate a spare pump that will be installed upon failure of the existing test pump. Before replacement activities can be initiated, equipment must be available to remove the existing pump. A pump removal system is currently being designed and fabricated that will support the retrieval, transportation and disposal of the existing pump. The Equipment Removal System consists of six major components: the flexible receiver system (FRS), the equipment storage container, the container strongback system, the container transport trailer, the support cranes, and the pump washdown system

  14. Guidelines for seismic qualification by experience in ALWRs

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.

    1993-01-01

    The methodologies and acceptance criteria for seismic qualification of equipment are provided in IEEE Std. 344 endorsed by the Nuclear Regulatory Commission (NRC) in the Standard Review Plan. The IEEE Standard allows seismic qualification by use of the similarity analysis method. Data available from past earthquake events or vibration tests can be used in this regard. The nuclear industry has collected a vast amount of earthquake experience and test data in the last decade, and is planning to use it for seismic qualification of equipment in advanced light water reactor (ALWR) plants. This paper discusses the existing data bases including their limitations and describes the ways these data bases can be used for equipment qualification in ALWR plants

  15. Guidelines for seismic qualification by experience in ALWRs

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.

    1994-01-01

    The methodologies and acceptance criteria for seismic qualification of equipment are provided in IEEE Std. 344 endorsed by the Nuclear Regulatory Commission (NRC) in the Standard Review Plan. The IEEE Standard allows seismic qualification by use of the similarity analysis method. Data available from past earthquake events or vibration tests can be used in this regard. The nuclear industry has collected a vast amount of earthquake experience and test data in the last decade, and is planning to use it for seismic qualification of equipment in advanced light water reactor (ALWR) plants. This paper discusses the existing data bases including their limitations and describes the ways these data bases can be used for equipment qualification in ALWR plants

  16. Evaluation of the qualification of SPERT [Special Power Excursion Reactor Test] fuel for use in non-power reactors

    International Nuclear Information System (INIS)

    1987-08-01

    This report summarizes the US Nuclear Regulatory Commission staff's evaluation of the qualification of the stainless-steel-clad uranium/oxide (UO 2 ) fuel pins for use in non-power reactors. The fuel pins were originally procured in the 1960's as part of the Special Power Excursion Reactor Test (SPERT) program. Argonne National Laboratory (ANL) examined 600 SPERT fuel pins to verify that the pins were produced according to specification and to assess their present condition. The pins were visually inspected under 6X magnification and by X-radiographic, destructive, and metallographic examinations. Spectrographic and chemical analyses were performed on the UO 2 fuel. The results of the qualification examinations indicated that the SPERT fuel pins meet the requirements of Phillips Specification No. F-1-SPT and have suffered no physical damage since fabrication. Therefore, the qualification results give reasonable assurance that the SPERT fuel rods are suitable for use in non-power reactors provided that the effects of thin-wall defects in the region of the upper end cap and low-density fuel pellets are evaluated for the intended operating conditions. 1 ref., 4 figs., 11 tabs

  17. Qualification Testing Versus Quantitative Reliability Testing of PV - Gaining Confidence in a Rapidly Changing Technology: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Repins, Ingrid L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hacke, Peter L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jordan, Dirk [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kempe, Michael D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Whitfield, Kent [Underwriters Laboratories; Phillips, Nancy [DuPont; Sample, Tony [European Commission; Monokroussos, Christos [TUV Rheinland; Hsi, Edward [Swiss RE; Wohlgemuth, John [PowerMark Corporation; Seidel, Peter [First Solar; Jahn, Ulrike [TUV Rheinland; Tanahashi, Tadanori [National Institute of Advanced Industrial Science and Technology; Chen, Yingnan [China General Certification Center; Jaeckel, Bengt [Underwriters Laboratories; Yamamichi, Masaaki [RTS Corporation

    2017-10-05

    Continued growth of PV system deployment would be enhanced by quantitative, low-uncertainty predictions of the degradation and failure rates of PV modules and systems. The intended product lifetime (decades) far exceeds the product development cycle (months), limiting our ability to reduce the uncertainty of the predictions for this rapidly changing technology. Yet, business decisions (setting insurance rates, analyzing return on investment, etc.) require quantitative risk assessment. Moving toward more quantitative assessments requires consideration of many factors, including the intended application, consequence of a possible failure, variability in the manufacturing, installation, and operation, as well as uncertainty in the measured acceleration factors, which provide the basis for predictions based on accelerated tests. As the industry matures, it is useful to periodically assess the overall strategy for standards development and prioritization of research to provide a technical basis both for the standards and the analysis related to the application of those. To this end, this paper suggests a tiered approach to creating risk assessments. Recent and planned potential improvements in international standards are also summarized.

  18. Qualification issues associated with the use of advanced instrumentation and control systems hardware in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Antonescu, C.

    1993-01-01

    The instrumentation and control (I ampersand C) systems in advanced reactors will make extensive use of digital controls, microprocessors, multiplexing, and Tiber-optic transmission. Elements of these advances in I ampersand C have been implemented on some current operating plants. However, the widespread use of the above technologies, as well as the use of artificial intelligence with minimum reliance on human operator control of reactors, highlights the need to develop standards for qualifying I ampersand C used in the next generation of nuclear power plants. As a first step in this direction, the protection system I ampersand C for present-day plants was compared to that proposed for advanced light water reactors (ALWRs). An evaluation template was developed by assembling a configuration of a safety channel instrument string for a generic ALWR, then comparing the impact of environmental stressors on that string to their effect on an equivalent instrument string from an existing light water reactor. The template was then used to address reliability issues for microprocessor-based protection systems. Standards (or lack thereof) for the qualification of microprocessor-based safety I ampersand C systems were also identified. This approach addresses in part issues raised in Nuclear Regulatory Commission policy document SECY-91-292. which recognizes that advanced I ampersand C systems for the nuclear industry are ''being developed without consensus standards, as the technology available for design is ahead of the technology that is well understood through experience and supported by application standards.''

  19. Qualification issues associated with the use of advanced instrumentation and control systems hardware in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Antonescu, C.

    1993-01-01

    The instrumentation and control (I ampersand C) systems in advanced reactors will make extensive use of digital controls, microprocessors, multiplexing, and fiber-optic transmission. Elements of these advances in I ampersand C have been implemented on some current operating plants. However, the widespread use of the above technologies, as well as the use of artificial intelligence with minimum reliance on human operator control of reactors, highlights the need to develop standards for qualifying I ampersand C used in the next generation of nuclear power plants. As a first step in this direction, the protection system I ampersand C for present-day plants was compared to that proposed for advanced light water reactors (ALWRs). An evaluation template was developed by assembling a configuration of a safety channel instrument string for a generic ALWR, then comparing the impact of environmental stressors on that string to their effect on an equivalent instrument string from an existing light water reactor. The template was then used to address reliability issues for microprocessor-based protection systems. Standards (or lack thereof) for the qualification of microprocessor-based safety I ampersand C systems were also identified. This approach addresses in part issues raised in Nuclear Regulatory Commission policy document SECY-91-292, which recognizes that advanced I ampersand C systems for the nuclear industry are open-quotes being developed without consensus standards, as the technology available for design is ahead of the technology that is well understood through experience and supported by application standards.close quotes

  20. Use of cardio-diagnostics of D&K-TEST for individualizations of training process of skilled short track speed skaters high qualification

    Directory of Open Access Journals (Sweden)

    Kygayevskiy S.A.

    2009-10-01

    Full Text Available In the article possibilities of individualization of training process of short track speed skaters high qualification are resulted on the basis of influence of application of loadings of different orientation on the indexes of cardio-diagnostics of D&K-TEST. The influences of loadings of different physiological and metabolic orientation given about efficiency are resulted on the level of functional preparedness of short track speed skaters of high qualification.

  1. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  2. Qualification and Life Testing of Li-Ion Ves16 Batteries

    Directory of Open Access Journals (Sweden)

    Remy Stéphane

    2017-01-01

    Up to the present time, Saft batteries have been mainly utilizing for space applications high capacity cells, like the 45 Ah VES180 and the 35 Ah VES140 cells, targeting predominantly space missions in Geostationary Earth Orbit (GEO. However following the qualification and commercialization of the Saft 4.5 Ah VES16 cell in October 2011 [1] & [2], Saft has been developing and qualifying in the frame of this ESA GSTP 5.2 contract, VES 16 batteries for space missions, targeting both GEO and Low Earth Orbit (LEO satellite missions. The electrochemistry of the VES16 cells used for the battery modules under the ESA qualification program is not novel. For VES16 cells, the Saft knowhow from large capacity space cells used for space applications, since SMART 1 mission in 2003, has been tailored for a cell with smaller capacity in order to facilitate the modular philosophy that has been deployed in this battery range.

  3. Beryllium irradiation embrittlement test programme. Material and specimen specification, manufacture and qualification

    International Nuclear Information System (INIS)

    Harries, D.R.; Dalle Donne, M.

    1996-06-01

    The report presents the specification, manufacture and qualification of the beryllium specimens to be irradiated in the BR2 reactor in Mol to investigate the effect of the neutron irradiation on the embrittlement as a function of temperature and beryllium oxide content. This work was been performed in the framework of the Nuclear Fusion Project of the Forschungszentrum Karlsruhe and is supported by the European Union within the European Fusion Technology Program. (orig.)

  4. Thermo-optical vacuum testing of IRNSS laser retroreflector array qualification model

    Science.gov (United States)

    Porcelli, L.; Boni, A.; Ciocci, E.; Contessa, S.; Dell'Agnello, S.; Delle Monache, G.; Intaglietta, N.; Martini, M.; Mondaini, C.; Patrizi, G.; Salvatori, L.; Tibuzzi, M.; Lops, C.; Cantone, C.; Tuscano, P.; Maiello, M.; Venkateswaran, R.; Chakraborty, P.; Ramana Reddy, C. V.; Sriram, K. V.

    2017-09-01

    We describe the activities performed by SCF_Lab (Satellite/lunar/GNSS laser ranging/altimetry and cube/microsat Characterization Facilities Laboratory) of INFN-LNF for the thermo-optical vacuum testing activity of a IRNSS (Indian Regional Navigation Satellite System) LRA (Laser Retroreflector Array), under contract for ISRO-LEOS. To our knowledge, this is the first publication on the characterization of the optical performance of an LRA operating at about 36,000 km altitude (typical of regional GNSS segments, namely QZSS, COMPASS-G) executed in fully representative, carefully lab-simulated space conditions. In particular, this is the only such publication concerning IRNSS. Since laser ranging to its altitude is more challenging than to GNSS altitudes (from about 19,100 km for GLONASS to about 23,200 km for Galileo), comparative measurements were long awaited by ILRS (International Laser Ranging Service) and we present measurements of the absolute laser return to ground stations of the ILRS in terms of lidar OCS (Optical Cross Section) at the IRNSS relevant value of velocity aberration, in turn derived from measurements of the full FFDP (Far Field Diffraction Pattern) over a very large range of velocity aberrations. These measurements were acquired: (i) on a full-size qualification model of a IRNSS CCR (Cube Corner Retroreflector) LRA that ISRO-LEOS provided to INFN-LNF; (ii) during the lab-simulation of a 1/4 orbit segment, in which the LRA CCRs are exposed to the perturbation of the sun heat at varying angles, from grazing incidence (90° with respect to the direction perpendicular to the plane of array), up to the perpendicular to the LRA, with a same time variation consistent with the actual space orbit. In this 1/4 orbit condition, the LRA experiences potentially large thermal degradations of the OCS, depending on the detailed thermal and mechanical design of the LRA. Since all GNSS constellations have different LRA designs or configurations, this is another

  5. Development of methods for nuclear power plant personnel qualifications and training

    International Nuclear Information System (INIS)

    Jorgensen, C.C.; Carter, R.J.

    1985-01-01

    The Nuclear Regulatory Commission (NRC) has proposed that additions and revisions should be made to Title 10 of the ''Code of Federal Regulations,'' Parts 50 and 55, and to Regulatory Guides 1.8 and 1.149. Oak Ridge National Laboratory (ORNL) is developing methods and some aspects of the technical basis for the implementation and assessment of training programs, personnel qualifications, and simulation facilities to be designed in accordance with the proposed rule changes. The paper describes the three methodologies which were developed during the FY-1984 research. The three methodologies are: (1) a task sort procedure (TSORT); (2) a simulation facility evaluation methodology; and (3) a task analysis profiling system (TAPS). TAPS is covered in detail in this paper. The task analysis profiling system has been designed to support training research. It draws on artificial intelligence concepts of pattern matching to provide an automated task analysis of normal English descriptions of job behaviors. TAPS development consisted of creating a precise method for the definition of skills, knowledge, abilities, and attitudes (SKAA), and generating SKAA taxonomic elements. It systematically outputs skills, knowledge, attitudes, and abilities, and information associated with them

  6. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  7. Interim salt disposition program macrobatch 6 tank 21H qualification monosodium titanate and cesium mass transfer tests

    Energy Technology Data Exchange (ETDEWEB)

    Washington, A. L. II; Peters, T. B.; Fink, S. D.

    2013-02-25

    Savannah River National Laboratory (SRNL) performed experiments on qualification material for use in the Interim Salt Disposition Program (ISDP) Batch 6 processing. This qualification material was a set of six samples from Tank 21H in October 2012. This sample was used as a real waste demonstration of the Actinide Removal Process (ARP) and the Extraction-Scrub-Strip (ESS) tests process. The Tank 21H sample was contacted with a reduced amount (0.2 g/L) of MST and characterized for strontium and actinide removal at 0 and 8 hour time intervals in this salt batch. {sup 237}Np and {sup 243}Am were both observed to be below detection limits in the source material, and so these results are not reported in this report. The plutonium and uranium samples had decontamination factor (DF) values that were on par or slightly better than we expected from Batch 5. The strontium DF values are slightly lower than expected but still in an acceptable range. The Extraction, Scrub, and Strip (ESS) testing demonstrated cesium removal, stripping and scrubbing within the acceptable range. Overall, the testing indicated that cesium removal is comparable to prior batches at MCU.

  8. Qualification methodologies for mechanical component, I and C, piping using test lab

    International Nuclear Information System (INIS)

    Ichikawa, Toshio

    2001-01-01

    There are many methods of verifying the intensity of a structure, a function, a vibration characteristics, etc. The seismic test which verifies the function during the earthquake of a components simple substance (seismic test which checks durability according to components types). How to verify the analysis technique by the scale model and to check the intensity of plant operating conditions by the scale model results. The model of the same size as the actual plant is created and there is a method of verifying intensity and the function directly. A seismic test is restrained by the frequency of an evaluation objective, and the capability of actuator equipment, and is carried out. Moreover, otherwise, restrictions are the size of a table, actuation power, environment, etc. Here, further examples are introduced, such as evaluation by the examination that combined analysis, experimental test use and analysis, and the experimental test, and the method of proving only by test, and have the seismic check method by test learned in this lecture. Typical examples are explained. Based on the seismic test result carried out with experimental research equipment, how to verify that the required function to components, such as a structure of reactor internals, is maintained at the time of an earthquake is explained. In this case, differences of the simulation environment of the model in. a test, earthquake conditions simulated by shaker table of test conditions and actual plant conditions are important for the evaluation method determination. In nuclear equipment, there is what is required to achieve the static function to hold pressure boundary to the high temperature inside apparatus piping - high-pressure flow, and dynamic functions, such as insertion of a valve, a pump, and a control rod. Moreover, in order to maintain and carry out the safe stop of the safe operation, there is I and C for controlling - supervising these components. In order for this functional maintenance

  9. Improvement and qualification of ultrasonic testing of dissimilar welds in the primary circuit of NPPs

    International Nuclear Information System (INIS)

    Mitzscherling, Steffen; Barth, Enrico; Homann, Tobias; Prager, Jens; Goetschel, Sebastian; Weiser, Martin

    2017-01-01

    The austenitic and dissimilar welds found in the primary circuit of nuclear power plants are not only extremely relevant to safety but also place very high demands on material testing. In addition to limited accessibility, the macroscopic structure of the weld seam is of paramount importance for ultrasound testing. In order to reliably determine material errors in position and size, the grain orientations and the elastic constants of the anisotropic weld bead structure must be known. The following work steps are used for the imaging representation of possible material defects: First, the weld seam is sounded in order to be able to determine important weld seam parameters, such as, for example, the grain orientation, using an inverse method. On the basis of these parameters, the sound paths are simulated in the next step by means of raytracing (RT). Finally, this RT simulation is assigned the measurement data (A-scans) from different transmitter and receiver positions and superimposed according to the Synthetic Aperature Focusing Technique (SAFT) method. The combination of inverse process, RT and SAFT also ensures a correct visualization of the faults in anisotropic materials. We explain these three methods and present the test arrangement of test specimens with artificial test errors. Measurement data as well as their evaluation are compared with the results of a CIVA simulation. [de

  10. ADDING ECOLOGICAL REALISM TO PLANT TESTING

    Science.gov (United States)

    Current test protocols for the protection of nontarget plants used when registering pesticides in the United States and many other countries depend on two tests using greenhouse grown, agricultural seedling plants. The seedling emergence and vegetative vigor tests are used to as...

  11. Executive summary of the guidebook on training to establish and maintain the qualification and competence of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1990-01-01

    Since the IAEA published its guidebook on the qualification of nuclear power plant operation personnel in 1984 (Technical Reports Series no. 242) there have been important developments in the approach for training adopted by many operating organizations in different countries. The guidebook, described in this report, proposes an approach which is comprehensive and systematic in its methodology and cost effective in its implementation. 5 refs. 1 fig

  12. Executive summary of the guidebook on training to establish and maintain the qualification and competence of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1989-01-01

    Since the IAEA published its Guidebook on the Qualification of Nuclear Power Plant Operations Personnel in 1984 (Technical Reports Series No. 242) there have been important developments in the approach for training adopted by many operating organizations in different countries. The Guidebook, described in this report, proposes an approach which is comprehensive and systematic in its methodology and cost effective in its implementation. 5 refs, 1 fig

  13. An evaluation of methodology for seismic qualification of equipment, cable trays, and ducts in ALWR plants by use of experience data

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.; Kana, D.D.; Kennedy, R.P.; Schiff, A.J.

    1997-07-01

    Advanced Reactor Corporation (ARC) has developed a methodology for seismic qualification of equipment, cable trays and ducts in Advanced Light Water Reactor plants. A Panel (members of which acted as individuals) supported by the Office of Nuclear Regulatory Research of the Nuclear Regulatory Commission has evaluated this methodology. The review approach and observations are included in this report. In general, the Panel supports the ARC methodology with some exceptions and provides recommendations for further improvements. 26 refs., 10 figs., 1 tab

  14. An evaluation of methodology for seismic qualification of equipment, cable trays, and ducts in ALWR plants by use of experience data

    Energy Technology Data Exchange (ETDEWEB)

    Bandyopadhyay, K.K.; Kana, D.D.; Kennedy, R.P.; Schiff, A.J.

    1997-07-01

    Advanced Reactor Corporation (ARC) has developed a methodology for seismic qualification of equipment, cable trays and ducts in Advanced Light Water Reactor plants. A Panel (members of which acted as individuals) supported by the Office of Nuclear Regulatory Research of the Nuclear Regulatory Commission has evaluated this methodology. The review approach and observations are included in this report. In general, the Panel supports the ARC methodology with some exceptions and provides recommendations for further improvements. 26 refs., 10 figs., 1 tab.

  15. Qualification, training, licensing/authorization and retraining of operating personnel in nuclear power plants. Noteworthy topics identified by evaluation of the practices in countries of the European Communities

    International Nuclear Information System (INIS)

    Kraut, A.; Pfeffer, W.

    1987-01-01

    In the report EUR 10118 '' Qualification, training, licensing and retraining of operating shift personnel in nuclear power plants'' the current practice in the countries of the European Communities as well as the procedures and programmes applied in Sweden, Switzerland and the USA are outlined and evaluated. The intent was to derive fundamental and generally valid concepts concerning shift-staff training and other relevant aspects. Those items were identified that seemed to be noteworthy because they give some guidance on how to achieve and maintain the qualification of the shift staff of NPPs or how to improve the staffing of the control room. These noteworthy topics identified by evaluation of the practice in countries of the European Communities and also elsewhere are presented in the publication at hand. The report addresses the following topics: tasks of the shift personnel, nomenclature for different grades of the personnel; shift staffing and staffing of the control room; criteria for personnel selection when recruiting new shift staff; personnel qualification necessary for recruitment; training of shift personnel; retraining and preservation of qualification standards; training facilities, especially simulators; responsibility for training; licensing/authorization; retirement from shift work. Consideration of these more general aspects and concepts may lead to improvement in training. The job descriptions given in the Annex to the document are only intended to give a general understanding of the typical designations, tasks and responsibilities of shift staff

  16. Nuclear safety review for qualification of class 1E motor inside containment for nuclear power stations

    International Nuclear Information System (INIS)

    Li Shixin; Wu Qi; Zhang Yunbo; Wu Caixia

    2013-01-01

    In nuclear power plants with pressurized water reactors, the review for class 1E motor inside containment qualification process and documents is an important aspect of nuclear safety equipment review, and the reviewers should make evaluations for the qualification test results in terms of the compliance with standard and regulation, and the consistency with inside containment environment. Firstly, this paper introduces the qualification test of class 1E motor inside containment for nuclear power generating stations, such as aging test and design-basis-event test. Second, there is a discussion about typical problems of review. At last, comparison of IEEE334 with RCC-E is conducted and explored. (authors)

  17. Qualification testing facility for type A, B and C packages to be used for transport and storage of radioactive materials

    International Nuclear Information System (INIS)

    Vieru, G.; Nistor, V.; Vasile, A.; Cojocaru, V.

    2009-01-01

    In accordance with the Economic Commission for Europe-Committee on inland transport (ADR- European Agreement-concerning the international carriage of dangerous goods by road, 2007 Edition) the Safety and Security of the dangerous goods class No. 7 - Radioactive Materials during transport in all different modes - by road, by rail, by sea, by inland rivers or by air - have to be ensured at a very high level. The radioactive materials (RAM) packaging have to comply to all transport conditions, routine or in accident conditions, possibly to occur during transportation operations. It is well known that the safety in the transport of RAM is dependent on packaging appropriate for the contents being shipped rather than on operational and/or administrative actions required for the package. The quality of these packages - type A, B or C has to be proved by performing qualification tests in accordance with the Romanian nuclear regulation conditions provided by CNCAN Order no. 357/22.12.2005- N orms for a Safe Transport of Radioactive Material , the IAEA Vienna Recommendation (1, 2) stipulated in the Safety standard TS-R-1- Regulation for the Safe Transport of Radioactive Material, 2005 Edition, and other applicable international recommendations. The paper will describe the components of the designed testing facilities, and the qualification testing to be performed for all type A, B and C packages subjected to the testing Quality assurance and quality controls measures taken in order to meet technical specification provided by the design are also presented and commented. The paper concludes that the new Romanian Testing Facilities for RAM packages will comply with the national safe standards as well as with the IAEA applicable recommendation provided by the TS-R-1 safety standard. (authors)

  18. Qualification and actuation of the independent technical supervision organisms in nuclear power plants and others facilities

    International Nuclear Information System (INIS)

    1999-09-01

    This norm presents the following objectives: establishment of the Brazilian National Nuclear Energy Commission requirements for qualifying an institution as independent technical supervision organization, in a specific area of activity related to nuclear power plants and others nuclear or radioactive facilities as appropriated; regulation of the independent technical supervision and others complementary activities to be executed by an independent technical supervision organism

  19. Thermography During Thermal Test of the Gaia Deployable Sunshield Assembly Qualification Model in the ESTEC Large Space Simulator

    Science.gov (United States)

    Simpson, R.; Broussely, M.; Edwards, G.; Robinson, D.; Cozzani, A.; Casarosa, G.

    2012-07-01

    The National Physical Laboratory (NPL) and The European Space Research and Technology Centre (ESTEC) have performed for the first time successful surface temperature measurements using infrared thermal imaging in the ESTEC Large Space Simulator (LSS) under vacuum and with the Sun Simulator (SUSI) switched on during thermal qualification tests of the GAIA Deployable Sunshield Assembly (DSA). The thermal imager temperature measurements, with radiosity model corrections, show good agreement with thermocouple readings on well characterised regions of the spacecraft. In addition, the thermal imaging measurements identified potentially misleading thermocouple temperature readings and provided qualitative real-time observations of the thermal and spatial evolution of surface structure changes and heat dissipation during hot test loadings, which may yield additional thermal and physical measurement information through further research.

  20. Isotope Brayton ground demonstration testing and flight qualification. Volume 1. Technical program

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-09

    A program is proposed for the ground demonstration, development, and flight qualification of a radioisotope nuclear heated dynamic power system for use on space missions beginning in the 1980's. This type of electrical power system is based upon and combines two aerospace technologies currently under intense development; namely, the MHW isotope heat source and the closed Brayton cycle gas turbine. This power system represents the next generation of reliable, efficient economic electrical power equipment for space, and will be capable of providing 0.5 to 2.0 kW of electric power to a wide variety of spacecraft for earth orbital and interplanetary missions. The immediate design will be based upon the requirements for the Air Force SURVSATCOM mission. The proposal is presented in three volumes plus an Executive Summary. This volume describes the tasks in the technical program.

  1. Study on 'Safety qualification of process computers used in safety systems of nuclear power plants'

    International Nuclear Information System (INIS)

    Bertsche, K.; Hoermann, E.

    1991-01-01

    The study aims at developing safety standards for hardware and software of computer systems which are increasingly used also for important safety systems in nuclear power plants. The survey of the present state-of-the-art of safety requirements and specifications for safety-relevant systems and, additionally, for process computer systems has been compiled from national and foreign rules. In the Federal Republic of Germany the KTA safety guides and the BMI/BMU safety criteria have to be observed. For the design of future computer-aided systems in nuclear power plants it will be necessary to apply the guidelines in [DIN-880] and [DKE-714] together with [DIN-192]. With the aid of a risk graph the various functions of a system, or of a subsystem, can be evaluated with regard to their significance for safety engineering. (orig./HP) [de

  2. Nuclear power plant shift technical advisor. Recommendations for position description, qualifications, education and training

    International Nuclear Information System (INIS)

    1981-01-01

    The purpose of this document is to describe the position and identify specific areas of formal education, plant-specific training and experience necessary to assure an advanced level of analytical ability on shift. These recommendations will provide a level of technical ability that is essential to improved operational safety and are consistent with regulatory requirements. This position was developed in conjunction with representatives of utilities, equipment vendors and engineering educators, giving consideration to specific contributions the function must make to shift operations

  3. Hybrid Qualifications

    DEFF Research Database (Denmark)

    Against the background of increasing qualification needs there is a growing awareness of the challenge to widen participation in processes of skill formation and competence development. At the same time, the issue of permeability between vocational education and training (VET) and general education...... has turned out as a major focus of European education and training policies and certainly is a crucial principle underlying the European Qualifications Framework (EQF). In this context, «hybrid qualifications» (HQ) may be seen as an interesting approach to tackle these challenges as they serve «two...

  4. Functions important to nuclear power plant safety, and training and qualification of personnel

    International Nuclear Information System (INIS)

    1996-01-01

    The requirements for the safe operation of the organisation attending to direct operational, the maintenance and the technical support functions of a nuclear power plant are defined in the guide. The basic education, work experience and medical fitness for the job required during recruitment, the requirements relating to the initial training of a person for his job and certain job-specific approvals granted separately are presented. General requirements for the training function and for the refresher and continuing training arranged by the licence-holder are also set out. (1 ref.)

  5. Qualification of control room operators for nuclear power plants. A review of practices

    International Nuclear Information System (INIS)

    Spitalnik, J.; Hurley, F.I.

    1983-01-01

    The increasing complexity of nuclear power plants has increased the demands on operators and several countries have made a break with their traditional practice and made professional engineers available on operating shifts. Engineers are incorporated in differing organizational arrangements which require differing competence of all the members of the shift team. Analysis of the elements of competence shows that all the organizational arrangements can be made to work satisfactorily, provided attention is given to ensuring certain requirements. Analysis also enables some general requirements for the shift operating team to be defined. However, these requirements are ideal, since conditions in some countries prevent their attainment in the short term; the main difficulties stem from the attitudes of professional engineers to shift work and career development. (author)

  6. Qualification of Manual Phased Array Ultrasonic Techniques for Pipe Weld Inspection in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Poirier, J.; Hayes, P.; Vicat, F. [GE Inspection Technologies (United States)

    2011-07-01

    Phasor XS can be used for piping weld inspection in any facilities that use EPRI procedures (example: nuclear power plant in Usa, Japan, ...). Whole pipe range is inspected with 5 probes and 6 wedges: 4 1-dimensional probe for sound wave scanning (different frequency, different apertures); 1 dual matrix probe for LW scanning; there are 3 types of wedges optimized for weld inspection. Weld is scanned in 'Raster Scan', maximum range from 35 up to 80 degrees. Probe selection is defined in the procedure according to pipe diameter, pipe thickness and type of access (single or dual side). We have to note that datasets for dual matrix probe are provided with the procedure because this kind of probe cannot be programmed inside Phasor XS

  7. Qualification of a Plant Disease Simulation Model: Performance of the LATEBLIGHT Model Across a Broad Range of Environments.

    Science.gov (United States)

    Andrade-Piedra, Jorge L; Forbes, Gregory A; Shtienberg, Dani; Grünwald, Niklaus J; Chacón, María G; Taipe, Marco V; Hijmans, Robert J; Fry, William E

    2005-12-01

    ABSTRACT The concept of model qualification, i.e., discovering the domain over which a validated model may be properly used, was illustrated with LATEBLIGHT, a mathematical model that simulates the effect of weather, host growth and resistance, and fungicide use on asexual development and growth of Phytophthora infestans on potato foliage. Late blight epidemics from Ecuador, Mexico, Israel, and the United States involving 13 potato cultivars (32 epidemics in total) were compared with model predictions using graphical and statistical tests. Fungicides were not applied in any of the epidemics. For the simulations, a host resistance level was assigned to each cultivar based on general categories reported by local investigators. For eight cultivars, the model predictions fit the observed data. For four cultivars, the model predictions overestimated disease, likely due to inaccurate estimates of host resistance. Model predictions were inconsistent for one cultivar and for one location. It was concluded that the domain of applicability of LATEBLIGHT can be extended from the range of conditions in Peru for which it has been previously validated to those observed in this study. A sensitivity analysis showed that, within the range of values observed empirically, LATEBLIGHT is more sensitive to changes in variables related to initial inoculum and to weather than to changes in variables relating to host resistance.

  8. On safety 1E qualification of electrical equipment for nuclear power stations

    International Nuclear Information System (INIS)

    Segarceanu, D.; Geambasu, C.; Avramescu, M.

    1995-01-01

    Electrical equipment and systems for the emergency shutdown of a nuclear reactor are qualified according to safety class 1E. Methods of qualification meeting the requirements should be used, either individually or in combination include, type-test qualification, qualification by operating experience, qualification by analysis, combined qualification. These methods qualification principles, procedures and documents are discussed. (N.T.). 1 fig

  9. Nuclear power plant Olkiluoto 3. Containment leakage test under extreme conditions

    Energy Technology Data Exchange (ETDEWEB)

    Fleckenstein, Tobias [TUEV SUED Industrie Service GmbH, Munich (Germany). Measaruement Technology Dept.

    2015-01-15

    Modern nuclear power plants place high demands on the design and execution of safety checks. TUEV SUED supported the containment leakage test for the largest- capacity third generation nuclear power plant in the world - Olkiluoto 3 in Finland. The experts successfully met the challenges presented by exceptional parameters of the project. The containment of Olkiluoto 3 is unique in that the vessel's volume is 80,000 m{sup 3} while measurements were carried out over a period of ten days. To execute the test, 75 temperature and 15 humidity sensors had to be installed and correctly interlinked by more than ten kilometres of cable. These instruments also needed to withstand an absolute pressure of 6 bar, ambient temperatures of 30 C and high levels of humidity. These conditions required comprehensive preparation and a high amount of qualification tests. Parts of the qualifications were carried out at the autoclave system of the Technical University in Munich, Germany, where the project test conditions could be simulated. The software required to determine the tests was developed by TUEV SUED and verified by German's national accreditation body DAkkS under ISO 17025. TUEV SUED enabled the test schedule to continue without delay by analysing all recorded data continuously on site, including pressure, temperature, humidity and leakage mass flow curves. With the comprehensive preparation, data acquisition system recording measurements continuously and the on-time result calculation, all components of the leak-tightness assessment were successfully completed in accordance with requirements.

  10. Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-06-26

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.

  11. Thermal-hydraulic analyses for in-pile SCWR fuel qualification test loops and SCWR material loop

    Energy Technology Data Exchange (ETDEWEB)

    Vojacek, A.; Mazzini, G.; Zmitkova, J.; Ruzickova, M. [Research Centre Rez (Czech Republic)

    2014-07-01

    One of the R&D directions of Research Centre Rez is dedicated to the supercritical water-cooled reactor concept (SCWR). Among the developed experimental facilities and infrastructure in the framework of the SUSEN project (SUStainable ENergy) is construction and experimental operation of the supercritical water loop SCWL focusing on material tests. At the first phase, this SCWL loop is assembled and operated out-of-pile in the dedicated loop facilities hall. At this out-of-pile operation various operational conditions are tested and verified. After that, in the second phase, the SCWL loop will be situated in-pile, in the core of the research reactor LVR-15, operated at CVR. Furthermore, it is planned to carry out a test of a small scale fuel assembly within the SuperCritical Water Reactor Fuel Qualification Test (SCWR-FQT) loop, which is now being designed. This paper presents the results of the thermal-hydraulic analyses of SCWL loop out-of-pile operation using the RELAP5/MOD3.3. The thermal-hydraulic modeling and the performed analyses are focused on the SCWL loop model validation through a comparison of the calculation results with the experimental results obtained at various operation conditions. Further, the present paper focuses on the transient analyses for start-up and shut-down of the FQT loop, particularly to explore the ability of system codes ATHLET 3.0A to simulate the transient between subcritical conditions and supercritical conditions. (author)

  12. Re-qualification of switchgear equipment following field modification

    International Nuclear Information System (INIS)

    Tulk, J.D.; El Bestawi, M.A.

    1984-01-01

    A set of 4.16 kV switchgear was seismically qualified by shaker table test for use in a nuclear power plant. Later, the equipment was modified by the addition of two extra switches and enclosures. This paper describes the methods used to extend the qualification achieved in the original proof test to the new configuration. Qualification of the modified switchgear depended on demonstrating that the intensity of the shaking that would be experienced by equipment mounted in the extended enclosure during a design basis earthquake (DBE) would be no stronger than the shaking that occurred during the original qualification testing. This was accomplished by a combination of analysis and experiment. Natural frequencies and mode-shapes of the original and extended enclosure structures were determined through in-situ modal tests on the equipment. Mathematical models based on the experimental results were then used for dynamic analyses which generated two sets of in-equipment response spectra: one set representing the original qualification test; and one set representing the response of the modified equipment to a hypothetical DBE. Qualification was confirmed by demonstrating that the test-based response spectra for the original configuration exceeded the response spectra developed for the extended structure subjected to DBE level excitation

  13. Experimental tests and qualification of analytical methods to address thermohydraulic phenomena in advanced water cooled reactors. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    2000-05-01

    Worldwide there is considerable experience in nuclear power technology, especially in water cooled reactor technology. Of the operating plants, in September 1998, 346 were light water reactors (LWRs) totalling 306 GW(e) and 29 were heavy water reactors (HWRs) totalling 15 GW(e). The accumulated experience and lessons learned from these plants are being incorporated into new advanced reactor designs. Utility requirements documents have been formulated to guide these design activities by incorporating this experience, and results from research and development programmes, with the aim of reducing costs and licensing uncertainties by establishing the technical bases for the new designs. Common goals for advanced designs are high availability, user-friendly features, competitive economics and compliance with internationally recognized safety objectives. Large water cooled reactors with power outputs of 1300 MW(e) and above, which possess inherent safety characteristics (e.g. negative Doppler moderator temperature coefficients, and negative moderator void coefficient) and incorporate proven, active engineered systems to accomplish safety functions are being developed. Other designs with power outputs from, for example, 220 MW(e) up to about 1300 MW(e) which also possess inherent safety characteristics and which place more emphasis on utilization of passive safety systems are being developed. Passive systems are based on natural forces and phenomena such as natural convection and gravity, making safety functions less dependent on active systems and components like pumps and diesel generators. In some cases, further experimental tests for the thermohydraulic conditions of interest in advanced designs can provide improved understanding of the phenomena. Further, analytical methods to predict reactor thermohydraulic behaviour can be qualified for use by comparison with the experimental results. These activities should ultimately result in more economical designs. The

  14. Qualification of non-destructive examination for belgian nuclear reactor pressure vessel inspection

    International Nuclear Information System (INIS)

    Couplet, D.; Francoise, T.

    2001-01-01

    In Service Inspection (ISI) participates to the assessment of Nuclear Reactor Pressure Vessel Integrity. The performance of Non Destructive Examination (NDE) techniques must be demonstrated according to predefined objectives. The qualification process is essential to trust the reliability of the information provided by NDE. In Belgian Nuclear Power Plants, the qualification was conducted through a collaboration between the vendor and a technical group from the Electricity Utility. The important facts of this qualification will be presented: - the detailed definition of the inspection and qualifications objectives, based on a combination of the ASME code and the European Methodology for Qualification; - the systematic verification of the NDE performance and limitations, for each ISI objective, through an adequate combination of tests on blocks and technical justification; - the continuous improvement of the NDE procedure; - the feedback and the lessons learnt from site experience; - the necessary multi-disciplinary approach (NDE, degradation mechanisms, structural integrity)

  15. Qualification program for JHR fuel elements: Irradiation of the first JHR test assembly in the BR2-Evita loop

    International Nuclear Information System (INIS)

    Anselmet, M.-C.; Lemoine, P.; Koonen, E.; Benoit, P.; Gouat, P.; Claes, W.; Geens, F.; Miras, G.; Brisson, S.

    2010-01-01

    An experimental program has been designed by CEA to qualify the behaviour of the JHR fuel under conditions representative of the reactor operating ones. This program uses the SCK.CEN facilities, irradiating JHR lead test elements in the BR2 reactor, inside its central channel which has been particularly arranged for this objective (Evita loop). As a first step in the program, a two cycle irradiation (4 weeks by cycle) started mid-July 2009 and ended mid-November (EVITA-1). After a cooling phase, this first JHR lead test element will be submitted to post-irradiation examination. The second JHR test element began its irradiation in the first quarter of 2010; its unloading is planned before the end of 2010, after 5 cycles in the BR2 reactor. The results of these two experiments are expected as input information for the Safety Authority Report. This paper presents the qualification program with the objectives assigned to each phase (irradiation, examination). A first interpretation of the irradiation data for the first element is presented, so as the information available on the progress of the following phases of the programme. (author)

  16. Environmental qualification program for new designs

    International Nuclear Information System (INIS)

    Doerffer, K.

    2007-01-01

    Qualification of nuclear power plant equipment and components important to safety (ITS) is an integral part of the design process. The qualification methodology differs based on the severity of service conditions (operational and ambient), to which the ITS equipment is exposed. In Canada, the licensing requirements for environmental qualification for new designs are governed by the Canadian Standard Association (CSA) standard, N290.13-2005 titled 'Environmental Qualification of Equipment for CANDU Nuclear Power Plants' and the pre-consultation draft, 'Requirements for Design of Nuclear Power Plants'(DRD), issued for trial use by the Canadian Nuclear Safety Commission (CNSC) in March 2005. This paper will describe AECL's current Environmental Qualification program developed to comply with the above licensing requirements as applied to new designs. The focus will be given to qualification of ITS systems structures and components (SSC) to harsh conditions occurring due to the Design Basis Accidents (DBA). (author)

  17. Foster Wheeler Solar Development Corporation modular industrial solar retrofit qualification test results

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.; Lewandoski, A.A.

    1986-10-01

    Under the Department of Energy's Modular Industrial Solar Retrofit project, industrial process steam systems incorporating line-focus solar thermal collectors were designed and hardware was installed and tested. This report describes the test results for the system designed by Foster Wheeler Solar Development Corporation. The test series included function and safety tests to determine that the system operated as specified, an unattended operations test to demonstrate automatic operation, performance tests to provide a database for predicting system performance, and life cycle tests to evaluate component and maintenance requirements. Component-level modifications to improve system performance and reliability were also evaluated.

  18. Foster Wheeler Solar Development Corporation Modular Industrial Solar Retrofit qualification test results

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.; Lewandowski, A.A.

    1987-04-01

    Under the Department of Energy's Modular Industrial Solar Retrofit project, industrial process steam systems incorporating line-focus solar thermal collectors were designed and hardware was installed and tested. This report describes the test results for the system designed by Foster Wheeler Solar Development Corporation. The test series included function and safety tests to determine that the system operated as specified, an unattended operations test to demonstrate automatic operation, performance tests to provide a database for predicting system performance, and life cycle tests to evaluate component and maintenance requirements. Component-level modifications to improve system performance and reliability were also evaluated.

  19. ELIMINATION OF THE CHARACTERIZATION OF DWPF POUR STREAM SAMPLE AND THE GLASS FABRICATION AND TESTING OF THE DWPF SLUDGE BATCH QUALIFICATION SAMPLE

    Energy Technology Data Exchange (ETDEWEB)

    Amoroso, J.; Peeler, D.; Edwards, T.

    2012-05-11

    A recommendation to eliminate all characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification sample was made by a Six-Sigma team chartered to eliminate non-value-added activities for the Defense Waste Processing Facility (DWPF) sludge batch qualification program and is documented in the report SS-PIP-2006-00030. That recommendation was supported through a technical data review by the Savannah River National Laboratory (SRNL) and is documented in the memorandums SRNL-PSE-2007-00079 and SRNL-PSE-2007-00080. At the time of writing those memorandums, the DWPF was processing sludge-only waste but, has since transitioned to a coupled operation (sludge and salt). The SRNL was recently tasked to perform a similar data review relevant to coupled operations and re-evaluate the previous recommendations. This report evaluates the validity of eliminating the characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification samples based on sludge-only and coupled operations. The pour stream sample has confirmed the DWPF's ability to produce an acceptable waste form from Slurry Mix Evaporator (SME) blending and product composition/durability predictions for the previous sixteen years but, ultimately the pour stream analysis has added minimal value to the DWPF's waste qualification strategy. Similarly, the information gained from the glass fabrication and PCT of the sludge batch qualification sample was determined to add minimal value to the waste qualification strategy since that sample is routinely not representative of the waste composition ultimately processed at the DWPF due to blending and salt processing considerations. Moreover, the qualification process has repeatedly confirmed minimal differences in glass behavior from actual radioactive waste to glasses fabricated from simulants or batch chemicals. In

  20. Elimination Of The Characterization Of DWPF Pour Stream Sample And The Glass Fabrication And Testing Of The DWPF Sludge Batch Qualification Sample

    International Nuclear Information System (INIS)

    Amoroso, J.; Peeler, D.; Edwards, T.

    2012-01-01

    A recommendation to eliminate all characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification sample was made by a Six-Sigma team chartered to eliminate non-value-added activities for the Defense Waste Processing Facility (DWPF) sludge batch qualification program and is documented in the report SS-PIP-2006-00030. That recommendation was supported through a technical data review by the Savannah River National Laboratory (SRNL) and is documented in the memorandums SRNL-PSE-2007-00079 and SRNL-PSE-2007-00080. At the time of writing those memorandums, the DWPF was processing sludge-only waste but, has since transitioned to a coupled operation (sludge and salt). The SRNL was recently tasked to perform a similar data review relevant to coupled operations and re-evaluate the previous recommendations. This report evaluates the validity of eliminating the characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification samples based on sludge-only and coupled operations. The pour stream sample has confirmed the DWPF's ability to produce an acceptable waste form from Slurry Mix Evaporator (SME) blending and product composition/durability predictions for the previous sixteen years but, ultimately the pour stream analysis has added minimal value to the DWPF's waste qualification strategy. Similarly, the information gained from the glass fabrication and PCT of the sludge batch qualification sample was determined to add minimal value to the waste qualification strategy since that sample is routinely not representative of the waste composition ultimately processed at the DWPF due to blending and salt processing considerations. Moreover, the qualification process has repeatedly confirmed minimal differences in glass behavior from actual radioactive waste to glasses fabricated from simulants or batch chemicals. In contrast, the

  1. Qualification testing evaluation (QTE) program, FIN A-1051, Case 0686. Bimonthly status report, February-March 1986

    International Nuclear Information System (INIS)

    1986-01-01

    This report presents information on: accident methodologies assessments; accident environment effects; aging methodologies assessments; TMI-2 related activities; international programs coordination; research/facility definition; seismic methodologies; and related equipment qualification issues

  2. A high voltage test stand for electron gun qualification for LINACs

    International Nuclear Information System (INIS)

    Wanmode, Yashwant D.; Mulchandani, J.; Acharya, M.; Bhisikar, A.; Singh, H.G.; Shrivastava, Purushottam

    2011-01-01

    An electron gun lest stand has been developed at RRCAT. The test stand consists of a high voltage pulsed power supply, electron gun filament supply, grid supply, UHV system and electron gun current measurement system. Several electron guns developed indigenously were evaluated on this test stand. The shielding is provided for the electron gun set up. Electron gun tests can be tested upto 55 kV with pulse width of 15 microsecs and pulse repetition rates up to 200 Hz. The technical details of the subsystems are furnished and results of performance of the test stand have been reported in this paper. (author)

  3. SRNL PHASE 1 Assessment Of The WTP Waste Qualification Program

    International Nuclear Information System (INIS)

    Peeler, D.; Hansen, E.; Herman, C.; Marra, S.; Wilmarth, B.

    2012-01-01

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project is currently transitioning its emphasis from an engineering design and construction phase toward facility completion, start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements that must be met during the actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program. In general, the waste qualification program involves testing and analysis to demonstrate compliance with waste acceptance criteria, determine waste processability, and demonstrate laboratory-scale unit operations to support WTP operations. The testing and analysis are driven by data quality objectives (DQO) requirements necessary for meeting waste acceptance criteria for transfer of high-level wastes from the tank farms to the WTP, and for ensuring waste processability including proper glass formulations during processing within the WTP complex. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS) which were based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested subject matter experts (SMEs) from SRNL to support a technology exchange with respect to waste qualification programs in which a critical review of the WTP program could be initiated and lessons learned could be shared. The technology exchange was held on July 18-20, 2011 in Richland, Washington, and was the initial step in a multi-phased approach to support development and implementation of a successful waste qualification program at the WTP. The 3-day workshop was hosted by WTP with representatives from the Tank Operations Contractor (TOC) and SRNL in attendance as well as representatives from the US DOE Office of River Protection (ORP) and the Defense Nuclear Facility Safety Board (DNFSB) Site Representative office. The purpose of the

  4. Qualification of conditioning process

    International Nuclear Information System (INIS)

    Wolf, J.

    1989-01-01

    A conditioning process is qualified by the PTB if the execution of pre-treatment and conditioning occurs so that a safe and orderly final storage of the products and waste containers produced can be assumed. All the relevant operating conditions for the plant are laid down by the producer/conditioner of the waste in a handbook. The elements of product inspection by process qualification are shown in tabular form. (DG) [de

  5. Seismic functional qualification of active mechanical and electrical component based on shaking table testing

    International Nuclear Information System (INIS)

    Jurukovski, D.; Mamucevski, D.

    1996-01-01

    This report involves the description of the experimental seismic and vibration tests of electrical, mechanical and processing equipment that were carried out by using laboratory equipment with high performances. This equipment should generate programmable dynamic excitations, measure and analyze parameters defining dynamic behaviour of the structural and functional capabilities of the tested specimen. Development of testing methodology and criteria is described together with the method for processing the results. Application of the methodology and criteria to selected specimen is included

  6. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  7. Space Qualification Testing of a Shape Memory Alloy Deployable CubeSat Antenna

    Science.gov (United States)

    2016-09-15

    from a specific input vibration . This excitation vibration can be applied acoustically through a speaker or physically by an impact hammer. NASA...Shape Memory Alloy (SMA) L-band deployable QHA. In this research, a testing approach is developed to conduct random vibration , thermal vacuum...92 4.4 Vibration Test Results

  8. Design, Qualification and Integration Testing of the High-Temperature Resistance Temperature Device for Stirling Power System

    Science.gov (United States)

    Chan, Jack; Hill, Dennis H.; Elisii, Remo; White, Jonathan R.; Lewandowski, Edward J.; Oriti, Salvatore M.

    2015-01-01

    The Advanced Stirling Radioisotope Generator (ASRG), developed from 2006 to 2013 under the joint sponsorship of the United States Department of Energy (DOE) and National Aeronautics and Space Administration (NASA) to provide a high-efficiency power system for future deep space missions, employed Sunpower Incorporated's Advanced Stirling Convertors (ASCs) with operating temperature up to 840 C. High-temperature operation was made possible by advanced heater head materials developed to increase reliability and thermal-to-mechanical conversion efficiency. During a mission, it is desirable to monitor the Stirling hot-end temperature as a measure of convertor health status and assist in making appropriate operating parameter adjustments to maintain the desired hot-end temperature as the radioisotope fuel decays. To facilitate these operations, a Resistance Temperature Device (RTD) that is capable of high-temperature, continuous long-life service was designed, developed and qualified for use in the ASRG. A thermal bridge was also implemented to reduce the RTD temperature exposure while still allowing an accurate projection of the ASC hot-end temperature. NASA integrated two flight-design RTDs on the ASCs and assembled into the high-fidelity Engineering Unit, the ASRG EU2, at Glenn Research Center (GRC) for extended operation and system characterization. This paper presents the design implementation and qualification of the RTD, and its performance characteristics and calibration in the ASRG EU2 testing.

  9. Fusion Materials Irradiation Test Facility: a facility for fusion-materials qualification

    International Nuclear Information System (INIS)

    Trego, A.L.; Hagan, J.W.; Opperman, E.K.; Burke, R.J.

    1983-01-01

    The Fusion Materials Irradiation Test Facility will provide a unique testing environment for irradiation of structural and special purpose materials in support of fusion power systems. The neutron source will be produced by a deuteron-lithium stripping reaction to generate high energy neutrons to ensure damage similar to that of a deuterium-tritium neutron spectrum. The facility design is now ready for the start of construction and much of the supporting lithium system research has been completed. Major testing of key low energy end components of the accelerator is about to commence. The facility, its testing role, and the status and major aspects of its design and supporting system development are described

  10. Supplemental Immobilization Cast Stone Technology Development and Waste Form Qualification Testing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Westsik, Joseph H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Serne, R. Jeffrey [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pierce, Eric M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cozzi, Alex [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chung, Chul-Woo [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Swanberg, David J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-05-31

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). The pretreatment facility will have the capacity to separate all of the tank wastes into the HLW and LAW fractions, and the HLW Vitrification Facility will have the capacity to vitrify all of the HLW. However, a second immobilization facility will be needed for the expected volume of LAW requiring immobilization. A number of alternatives, including Cast Stone—a cementitious waste form—are being considered to provide the additional LAW immobilization capacity.

  11. Leakage test evaluation used for qualification of iodine-125 seeds sealing

    International Nuclear Information System (INIS)

    Feher, Anselmo; Rostelato, Maria E.C.M.; Zeituni, Carlos A.; Calvo, Wilson A.P.; Somessari, Samir L.; Moura, Joao A.; Moura, Eduardo S.; Souza, Carla D.; Rela, Paulo R.

    2009-01-01

    The prostate cancer is a problem of public health in Brazil, and the second cause of cancer deaths in men, exceeded only by lung cancer. Among the possible treatments available for prostate cancer is brachytherapy, in which small seeds containing Iodine-125 radioisotope are implanted in the prostate. The seed consists of a sealed titanium tube measuring 0.8 mm external diameter and 4.5 mm in length, containing a central silver wire with adsorbed Iodine-125. The tube sealing is made with titanium at the ends, using electric arc welding or laser process. This sealing must be leakage-resistant and free of cracks, therefore avoiding the Iodine-125 to deposit in the silver wire to escape and spread into the human body. To ensure this problem does not occur, rigorous leakage tests, in accordance with the standard Radiation protection - Sealed Radioactive Sources - leakage Test Methods - ISO 9978, should be applied. The aim of this study is to determine, implement and evaluate the leakage test to be used in the Iodine-125 seeds production, in order to qualify the sealing procedure. The standard ISO 9978 presents a list of tests to be carried out according to the type of source. The preferential methods for brachytherapy sources are soaking and helium. To assess the seeds leakage, the method of immersion test at room temperature was applied. The seeds are considered leakage-free if the detected activity does not exceed the 185 Bq (5 nCi). An Iodine standard was prepared and its value determined in a sodium iodide detector. A liquid scintillation counter was calibrated with the standard for seeds leakage tests. Forty-eight seeds were welded for these tests. (author)

  12. Conductor qualification tests for the 30-MJ Bonneville Power Administration SMES coil

    International Nuclear Information System (INIS)

    Schermer, R.I.; Boenig, H.J.; Henke, M.; Turner, R.D.; Schramm, R.

    1980-01-01

    The 30-MJ energy storage coil for the Bonneville Power Administration requires a low-loss, cryostable conductor that is able to carry 4.9 kA in a field of 2.8 T and will maintain its properties over 10 8 partial discharge cycles. The multi-level cable which satisfies these requirements has been extensively tested at various stages in its development and in its final form. Tests have been performed to determine the effect of manufacturing options on ac losses, low temperature electrical resistivity, stability, and fatigue resistance of the insulated conductor. This paper will concentrate on the stability and fatigue tests which have not previously been reported

  13. Mixing and sampling tests for Radiochemical Plant

    International Nuclear Information System (INIS)

    Ehinger, M.N.; Marfin, H.R.; Hunt, B.

    1999-01-01

    The paper describes results and test procedures used to evaluate uncertainly and basis effects introduced by the sampler systems of a radiochemical plant, and similar parameters associated with mixing. This report will concentrate on experiences at the Barnwell Nuclear Fuels Plant. Mixing and sampling tests can be conducted to establish the statistical parameters for those activities related to overall measurement uncertainties. Density measurements by state-of-the art, commercially availability equipment is the key to conducting those tests. Experience in the U.S. suggests the statistical contribution of mixing and sampling can be controlled to less than 0.01 % and with new equipment and new tests in operating facilities might be controlled to better accuracy [ru

  14. Radiation Testing, Characterization and Qualification Challenges for Modern Microelectronics and Photonics Devices and Technologies

    Science.gov (United States)

    LaBel, Kenneth A.; Cohn, Lewis M.

    2008-01-01

    At GOMAC 2007, we discussed a selection of the challenges for radiation testing of modern semiconductor devices focusing on state-of-the-art memory technologies. This included FLASH non-volatile memories (NVMs) and synchronous dynamic random access memories (SDRAMs). In this presentation, we extend this discussion in device packaging and complexity as well as single event upset (SEU) mechanisms using several technology areas as examples including: system-on-a-chip (SOC) devices and photonic or fiber optic systems. The underlying goal is intended to provoke thought for understanding the limitations and interpretation of radiation testing results.

  15. Testing of the Defense Waste Processing Facility Cold Chemical Dissolution Method in Sludge Batch 9 Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, T. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Pareizs, J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Coleman, C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Young, J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Brown, L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-05-10

    For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) tests the applicability of the digestion methods used by the DWPF Laboratory for elemental analysis of Sludge Receipt and Adjustment Tank (SRAT) Receipt samples and SRAT Product process control samples. DWPF SRAT samples are typically dissolved using a method referred to as the DWPF Cold Chemical or Cold Chem Method (CC), (see DWPF Procedure SW4- 15.201). Testing indicates that the CC method produced mixed results. The CC method did not result in complete dissolution of either the SRAT Receipt or SRAT Product with some fine, dark solids remaining. However, elemental analyses did not reveal extreme biases for the major elements in the sludge when compared with analyses obtained following dissolution by hot aqua regia (AR) or sodium peroxide fusion (PF) methods. The CC elemental analyses agreed with the AR and PF methods well enough that it should be adequate for routine process control analyses in the DWPF after much more extensive side-by-side tests of the CC method and the PF method are performed on the first 10 SRAT cycles of the Sludge Batch 9 (SB9) campaign. The DWPF Laboratory should continue with their plans for further tests of the CC method during these 10 SRAT cycles.

  16. The qualification of electrical components and instrumentations relevant to safety

    International Nuclear Information System (INIS)

    Zambardi, F.

    1989-03-01

    Systems and components relevant to safety of nuclear power plants must maintain their functional integrity in order to assure accident prevention and mitigation. Redundancy is utilized against random failures, nevertheless care must be taken to avoid common failures in redundant components. Main sources of degradation and common cause failures consist in the aging effects and in the changes of environmental conditions which occur during the plant life and the postulated accidents. These causes of degradation are expected to be especially significant for instrumentation and electrical equipment, which can have a primary role in safety systems. The qualification is the methodology by which component safety requirements can be met against the above mentioned causes of degradation. In this report the connection between the possible, plant conditions and the resulting degradation effects on components is preliminarily addressed. A general characterization of the qualification is then presented. Basis, methods and peculiar aspects are discussed and the qualification by testing is taken into special account. Technical and organizational aspects related to a plant qualification program are also focused. The report ends with a look to the most significant research and development activities. (author)

  17. A strategy for implementation of experience based seismic equipment qualification in IEEE and ASME industry standards

    International Nuclear Information System (INIS)

    Adams, T.M.

    1996-01-01

    In the past 20 years, extensive data on the performance of mechanical and electric equipment during actual strong motion earthquakes and seismic qualification tests has been accumulated. Recognizing that an experience based approach provides a technically sound and cost effective method for the seismic qualification of some or certain equipment, the IEEE Nuclear Power Engineering Committee and the ASME Committee on Qualification of Mechanical Equipment established a Special Working Group to investigate the incorporation of experienced based methods into the industry consensus codes and standards currently used in the seismic qualification of Seismic Category Nuclear Power Plant equipment. This paper presents the strategy (course of action) which was developed by the Special Working Group for meeting this objective of incorporation of experience based seismic qualification standards used in the design and seismic qualification of seismic category nuclear power plant equipment. This strategy was recommended to both chartering organizations, the IEEE Nuclear Power Engineering Committee and the ASME Committee on Qualification of Mechanical Equipment for their consideration and implementation. The status of the review and implementation of the Special Working Group's recommended strategy by the sponsoring organization is also discussed

  18. Study on personnel qualification for non-destructive tests in the field of reactor safety

    International Nuclear Information System (INIS)

    Trusch, K.; Wuestenberg, H.

    1977-01-01

    The training system for non-destructive testing is described, and the available and necessary personnel is analyzed; the personnel required for reactor safety problems is treated separately. On this basis, the subjects discussed in the study - available personnel, personnel requirements, training, training requirements, and suggestions for realisation - are treated in a general manner to begin with and afterwards with a view to specific problems of reactor safety. The methods employed are adapted to this situation. To obtain the necessary empirical data, questionnaires were set up and distributed, and experts in selected business companies and institutions were interviewed who work in the field of reactor safety or do same training in non-destructive testing. (orig.) [de

  19. Radiation Tolerance Qualification Tests of the Final Source Interface Unit for the ALICE Experiment

    CERN Document Server

    Dénes, E; Futó, E; Kerék, A; Kiss, T; Molnár, J; Novák, D; Soós, C; Tölyhi, T; Van de Vyvre, P

    2007-01-01

    The ALICE Detector Data Link (DDL) is a high-speed optical link designed to interface the readout electronics of ALICE sub-detectors to the DAQ computers. The Source Interface Unit (SIU) of the DDL will operate in radiation environment. Previous tests showed that a configuration loss of SRAM-based FPGA devices may happen and the frequency of undetected data errors in the FPGA user memory area is also not acceptable. Therefore, we redesigned the SIU card using another FPGA based on flash technology. In order to detect bit errors in the user memory we added parity check logic to the design. The new SIU has been extensively tested using neutron and proton irradiation to verify its radiation tolerance. In this paper we summarize the design changes, introduce the final design, and the results of the radiation tolerance measurements on the final card.

  20. Results of high heat flux qualification tests of W monoblock components for WEST

    Science.gov (United States)

    Greuner, H.; Böswirth, B.; Lipa, M.; Missirlian, M.; Richou, M.

    2017-12-01

    One goal of the WEST project (W Environment in Steady-state Tokamak) is the manufacturing, quality assessment and operation of ITER-like actively water-cooled divertor plasma facing components made of tungsten. Six W monoblock plasma facing units (PFUs) from different suppliers have been successfully evaluated in the high heat flux test facility GLADIS at IPP. Each PFU is equipped with 35 W monoblocks of an ITER-like geometry. However, the W blocks are made of different tungsten grades and the suppliers applied different bonding techniques between tungsten and the inserted Cu-alloy cooling tubes. The intention of the HHF test campaign was to assess the manufacturing quality of the PFUs on the basis of a statistical analysis of the surface temperature evolution of the individual W monoblocks during thermal loading with 100 cycles at 10 MW m-2. These tests confirm the non-destructive examinations performed by the manufacturer and CEA prior to the installation of the WEST platform, and no defects of the components were detected.

  1. Results of high heat flux qualification tests of W monoblock components for WEST

    International Nuclear Information System (INIS)

    Greuner, H; Böswirth, B; Lipa, M; Missirlian, M; Richou, M

    2017-01-01

    One goal of the WEST project (W Environment in Steady-state Tokamak) is the manufacturing, quality assessment and operation of ITER-like actively water-cooled divertor plasma facing components made of tungsten. Six W monoblock plasma facing units (PFUs) from different suppliers have been successfully evaluated in the high heat flux test facility GLADIS at IPP. Each PFU is equipped with 35 W monoblocks of an ITER-like geometry. However, the W blocks are made of different tungsten grades and the suppliers applied different bonding techniques between tungsten and the inserted Cu-alloy cooling tubes. The intention of the HHF test campaign was to assess the manufacturing quality of the PFUs on the basis of a statistical analysis of the surface temperature evolution of the individual W monoblocks during thermal loading with 100 cycles at 10 MW m −2 . These tests confirm the non-destructive examinations performed by the manufacturer and CEA prior to the installation of the WEST platform, and no defects of the components were detected. (paper)

  2. Methods Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Alessi, R. Sam; Grimmett, Tami; Vang, Leng; McGrath, Dave

    2010-01-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V and V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  3. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  4. Analysis of the qualification test standards for small radioactive material shipping packages

    International Nuclear Information System (INIS)

    McClure, J.D.

    1978-01-01

    The study compares the severity of the existing regulatory standards which are used to license radioactive material (RAM) shipping packages with the severity of transportation accidents. The basic findings of the study indicate that the present regulatory standards provide significantly higher levels of protection for surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It was also determined that crush can occur in all of the transport modes and is not presently included in existing regulations for accident conditions. Test proposals are included for the surface transport mode (truck, rail) and the air transport mode

  5. Development of Improved Accelerated Corrosion Qualification Test Methodology for Aerospace Materials

    Science.gov (United States)

    2014-11-01

    performance of magnesium -rich primer for aluminum alloys under salt spray test (ASTM B117) and natural exposure”, Corrosion Science 52 (2010) 1453...Center, FL (midnight 12-13-05 to midnight 12-14-05) 19400 19500 19600 19700 19800 19900 20000 20100 0 5 10 15 20 Cu m ul at iv e W ei gh t L os s...13-05 to midnight 12-14-05) 0 10000 20000 30000 40000 50000 60000 0 2000 4000 6000 8000 10000 Cu m ul at iv e W ei gh t L os s ( µg /c m 2 ) Hours

  6. Qualification of testing laboratories of Comision Nacional de Energia Atomica - CNEA

    International Nuclear Information System (INIS)

    Casa, Adriana; Palacios, Tulio; Peretti, Matilde; Pucci, Gladys; Resnizki, Sara

    1996-01-01

    Testing and calibration laboratories of the Argentine Atomic Energy Commission which made services for the nuclear and conventional industries must prove the reliability of their results. It is achieved implanting at the laboratories, a management quality system, to proof the capacity and technical aptitude, with the establish minimal requirements. When the requirement are fulfilled, the laboratory would be in conditions for a national level accreditation within the National System of Standards, Quality and Certification, recently created for our national government. The Laboratories Calibration Board of CNEA had made some assessments of a group of laboratories in order to determine their quality level. (author)

  7. VHDL basics applied design by SIPAC qualification system

    International Nuclear Information System (INIS)

    Park, In Ha; Mun, Da Cheol; Lee, Gwang Yeob

    2005-12-01

    This book has six chapters, which are about Flowrian of SIPAC qualification system including internet CAD system and remote server service, logic circuit on design and qualification of device such as gate circuit, multiplex and decoder, order logic circuit with D type flip-flop design and qualification and Rom and RAM's design and qualification, finite state machine such as odd checker, sequence detector, test clock generator and traffic light controller, design and qualification about data path, design of application circuit. It has two appendixes on install and the way to use SIPAC qualification system and remote service for SIPAC qualification system.

  8. Optical verification tests of the NISP/Euclid grism qualification model

    Science.gov (United States)

    Caillat, Amandine; Costille, Anne; Pascal, Sandrine; Vives, Sébastien; Rossin, Christelle; Sanchez, Patrice; Foulon, Benjamin

    2016-07-01

    The Euclid space mission aims at elucidating dark matter and dark energy mysteries thanks to two scientific instruments: VIS, the visible camera and NISP, the Near Infrared Spectro-Photometer. Millions of galaxies spectra will be recorded thanks to its spectroscopic mode using four grisms developed under LAM (Laboratoire d'Astrophysique de Marseille) responsibility. These dispersive optical components are made of a grating on a prism and include also, specifically for NISP, three other optical functions: spectral filtering, focus adjustment and spectral wavefront correction. Therefore, these optical elements are very challenging to manufacture (four industrial partners work on a single optical component) and to test before integration into NISP. In this paper, first we describe the optical specifications and the manufacturing process. Second, we explain the optical validation tests campaign: optical setups, measurements and data processing procedures used to validate these complex optical components, particularly for transmitted efficiency and wavefront error for which specifications are very stringent. Finally, we present the first results obtained on the grism EQM which manufacturing is on-going and almost finished.

  9. Qualification testing and full-scale demonstration of titanium-treated zeolite for sludge wash processing

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, W.J.

    1997-06-30

    Titanium-treated zeolite is a new ion-exchange material that is a variation of UOP (formerly Union Carbide) IONSIV IE-96 zeolite (IE-96) that has been treated with an aqueous titanium solution in a proprietary process. IE-96 zeolite, without the titanium treatment, has been used since 1988 in the West Valley Demonstration Project`s (WVDP) Supernatant Treatment System (STS) ion-exchange columns to remove Cs-137 from the liquid supernatant solution. The titanium-treated zeolite (TIE-96) was developed by Battelle-Pacific Northwest Laboratory (PNL). Following successful lab-scale testing of the PNL-prepared TIE-96, UOP was selected as a commercial supplier of the TIE-96 zeolite. Extensive laboratory tests conducted by both the WVDP and PNL indicate that the TIE-96 will successfully remove comparable quantities of Cs-137 from Tank 8D-2 high-level radioactive liquid as was done previously with IE-96. In addition to removing Cs-137, TIE-96 also removes trace quantities of Pu, as well as Sr-90, from the liquid being processed over a wide range of operating conditions: temperature, pH, and dilution. The exact mechanism responsible for the Pu removal is not fully understood. However, the Pu that is removed by the TIE-96 remains on the ion-exchange column under anticipated sludge wash processing conditions. From May 1988 to November 1990, the WVDP processed 560,000 gallons of liquid high-level radioactive supernatant waste stored in Tank 8D-2. Supernatant is an aqueous salt solution comprised primarily of soluble sodium salts. The second stage of the high-level waste treatment process began November 1991 with the initiation of sludge washing. Sludge washing involves the mixing of Tank 8D-2 contents, both sludge and liquid, to dissolve the sulfate salts present in the sludge. Two sludge washes were required to remove sulfates from the sludge.

  10. Modified enforcement policy relating to 10 CFR 50.49, ''Environmental qualification of electrical equipment important to safety for nuclear power plants'' (Generic Letter 88-07)

    International Nuclear Information System (INIS)

    Miraglia, F.J.

    1992-01-01

    Generic Letters, Bulletins, and Information Notices have been issued to provide guidance regarding the application and enforcement of 10 CFR 50.49, ''Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants.'' Generic Letter 85-15, issued August 6, 1985, and Generic Letter 86-15, issued September 22, 1986, provided information related to the deadlines for compliance with 10 CFR 50.49 and possible civil penalties applicable to licensees who were not in compliance with the rule as of the November 30, 1985 deadline. Upon review, the Commission found that the EQ Enforcement Policy promulgated in Generic Letter 86-15, could result in imposition of civil penalties that did not properly reflect the safety significance of EQ violations with respect to civil penalties imposed in the past. In the interest of continuing a tough but fair enforcement policy, the Commission determined that the EQ Enforcement Policy should be revised. The purpose of this letter is to provide a modification to the NRC's enforcement policy, as approved by the Commission, for environmental qualification (EQ) violations. This letter replaces the guidance provided in Generic Letters 85-15 and 86-15

  11. High temperature testing - a contribution to alloy development, alloy qualification and simulation of component Loading

    International Nuclear Information System (INIS)

    Scholz, A.; Schwienheer, M.; Mueller, F.; Linn, S.; Schein, M.; Walther, C.; Berger, C.

    2007-01-01

    In parallel to continued developments of steam and gas turbines as well as traffic engineering machines on the one hand, and marginal conditions like low specific fuel consumption and sufficient environment-friendliness on the other hand, the aim of improving the degree of efficiency by augmenting process parameters such as temperature and pressure is being followed. These efforts impact especially components of thermic machines and facilities subject to high thermal and mechanic exposure. Still largely unexplored is the interaction between microstructure characteristics determined through chemical composition, production processes and heat treatment, changes in the microstructure due to multiaxial load and the time-dependent deformation and stability resulting hereof. With regard to this background, improved methods of material properties determination, their modelling and transfer on the component enable to optimize wall thicknesses and degrees of efficiency. In the course of evaluation of static and cyclic material properties carried out also on faulty specimens, uncertainties occur which can originate from the testing process and analysis, as well as being influenced by the material itself and its process of production. Altogether, the demand for reliable determination of material properties and methods of scatterband treatment and their mathematical-statistical evaluation is in business. For simulation, consistent material datasets that describe the complex interaction between temperature, period of exposure and type of exposure are needed. Summarizing, the tasks dealt with qualify the entire process from production to the operational behaviour of components. (Abstract Copyright [2007], Wiley Periodicals, Inc.) [de

  12. CiPA: Ongoing testing, future qualification procedures, and pending issues.

    Science.gov (United States)

    Cavero, Icilio; Holzgrefe, Henry

    2015-01-01

    The comprehensive in vitro proarrhythmia assay (CiPA) is a nonclinical, mechanism-based paradigm for assessing drug proarrhythmic liability. The first CiPA assay determines effects on cloned human cardiac ion channels. The second investigates whether the latter study-generated metrics engender proarrhythmic markers on a computationally reconstructed human ventricular action potential. The third evaluates conclusions from, and searches possibly missed effects by in silico analysis, in human stem cell-derived cardiomyocytes (hSC-CMs). CiPA ad hoc Expert-Working Groups have proposed patch clamp protocols for seven cardiac ion channels, a modified O'Hara-Rudy model for in silico analysis, detailed procedures for field (MEA) and action potential (VSD) measurements in hSC-CMs, and 29 reference drugs for CiPA assay testing and validation. CiPA adoption as drug development tool for identifying electrophysiological mechanisms conferring proarrhythmic liability to candidate drugs is a complex, multi-functional task requiring significant time, reflection, and efforts to be fully achieved. Copyright © 2015 Elsevier Inc. All rights reserved.

  13. Studies to demonstrate the adequacy of testing results of the qualification tests for the actuator of main steam safety relive valves (MSSRV) in an advanced boiling water reactor (ABWR)

    International Nuclear Information System (INIS)

    Gou, P.F.; Patel, R.; Curran, G.; Henrie, D.; Solorzano, E.

    2005-01-01

    This paper presents several studies performed to demonstrate that the testing results from the qualification tests for the actuator of the Main Steam Safety Relief Valves (MSSRV; also called SRV in this paper) in GE's Advanced Boiling Water Reactor (ABWR) are in compliance with the qualification guidelines stipulated in the applicable IEEE standards. The safety-related function of the MSSRV is to relieve pressure in order to protect the reactor pressure vessel from over-pressurization condition during normal operation and design basis events. In order to perform this function, the SRV must actuate at a given set pressure while maintaining the pressure and structural integrity of the SRV. The valves are provided with an electro-pneumatic actuator assembly that opens the valve upon receipt of an automatic or manually initiated electric signal to allow depressurization of the reactor pressure vessel (RPV). To assure the SRV can perform its intended safety related functions properly, qualification tests are needed in addition to analysis, to demonstrate that the SRV can withstand the specified environmental, dynamic and seismic design basis conditions without impairing its safety related function throughout their installed life under the design conditions including postulated design basis events such as OBE loads and Faulted (SSE) events. The guidelines used for the test methods, procedures and acceptance criteria for the qualification tests are established in IEEE std 344-1987 and IEEE std 382-1985. In the qualification tests, the specimen consists of the actuator, control valve assembly, limit switches, and limit switch support structure. During the functional, dynamic and seismic tests, the test specimen was mounted on a SRV. Qualification of safety related equipment to meet the guidelines of the IEEE standards is typically a two-step process: 1) environmental aging and 2) design basis events qualification. The purpose of the first step is to put the equipment in an

  14. Qualification of RETRAN for simulator applications

    International Nuclear Information System (INIS)

    Harrison, J.F.

    1988-01-01

    The use of full-scope control room replica simulators increased substantially following the accident at Three Mile Island Unit 2. The technical capability required to represent severe events has been included, in varying degrees, in most simulators purchased since the TMI-2 accident. The ability of the instructor to create a large variety of combinations of malfunctions has also greatly expanded. The nuclear industry has developed a standard which establishes the minimum functional requirements for full-scope nuclear control room simulators used for operator training. This standard, ANSI/ANS-3.5, was first issued in 1981 and was reissued in 1985. A method for performing simulator qualification with best estimate analytical data has been proposed in EPRI NP-4243, Analytic Simulator Qualification Methodology. The idea presented there is to choose a set of transients which drive the simulator into all the system conditions (dynamic states) likely to be encountered during operator training. The key observable parameters for each state are compared to analyses performed with the best estimate analytical model The closeness of the comparison determines the fidelity of the simulator. The approach described in EPRI NP-4243 has been adapted for evaluating RETRAN's capability for use in simulator qualification. RETRAN analyses which compare the RETRAN results to plant or test facility data are evaluated with respect to the simulator test matrix documented in EPRI NP-4243

  15. TASK 3: PILOT PLANT GASIFIER TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Fusselman, Steve

    2015-11-01

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. Design, fabrication and initial testing of the pilot plant compact gasifier was completed in 2011 by a development team led by AR. Findings from this initial test program, as well as subsequent gasifier design and pilot plant testing by AR, identified a number of technical aspects to address prior to advancing into a demonstration-scale gasifier design. Key among these were an evaluation of gasifier ability to handle thermal environments with highly reactive coals; ability to handle high ash content, high ash fusion temperature coals with reliable slag discharge; and to develop an understanding of residual properties pertaining to gasification kinetics as carbon conversion approaches 99%. The gasifier did demonstrate the ability to withstand the thermal environments of highly reactive Powder River Basin coal, while achieving high carbon conversion in < 0.15 seconds residence time. Continuous operation with the high ash fusion temperature Xinyuan coal was demonstrated in long duration testing, validating suitability of outlet design as well as downstream slag discharge systems. Surface area and porosity data were obtained for the Xinyuan and Xinjing coals for carbon conversion ranging from 85% to 97%, and showed a pronounced downward trend in surface area per unit mass carbon as conversion increased. Injector faceplate measurements showed no incremental loss of material over the course of these experiments, validating the commercially traceable design approach and supportive of long injector life goals. Hybrid testing of PRB and natural gas was successfully completed over a wide range of natural gas feed content, providing test data to anchor predictions

  16. Nuclear energy electricity technical regulation on the qualification

    International Nuclear Information System (INIS)

    1995-01-01

    It tells the range of application purpose and of the qualification. It describes how to qualify of the class 1 E equipment, which are type test, operating experience, analysis and combined method. Next it deals with qualification procedure, which are specification requirement, requirement of qualification program, type testing, operating experience, analysis and combined qualification, acceptance criteria modification and extension with qualified life, simulated test profiles and document about type test data, operating experience data and extrapolation.

  17. TH-A-207B-02: QIBA Ultrasound Elasticity Imaging System Biomarker Qualification and User Testing of Systems

    International Nuclear Information System (INIS)

    Garra, B.

    2016-01-01

    Imaging of tissue elastic properties is a relatively new and powerful approach to one of the oldest and most important diagnostic tools. Imaging of shear wave speed with ultrasound is has been added to most high-end ultrasound systems. Understanding this exciting imaging mode aiding its most effective use in medicine can be a rewarding effort for medical physicists and other medical imaging and treatment professionals. Assuring consistent, quantitative measurements across the many ultrasound systems in a typical imaging department will constitute a major step toward realizing the great potential of this technique and other quantitative imaging. This session will target these two goals with two presentations. A. Basics and Current Implementations of Ultrasound Imaging of Shear Wave Speed and Elasticity - Shigao Chen, Ph.D. Learning objectives-To understand: Introduction: Importance of tissue elasticity measurement Strain vs. shear wave elastography (SWE), beneficial features of SWE The link between shear wave speed and material properties, influence of viscosity Generation of shear waves External vibration (Fibroscan) ultrasound radiation force Point push Supersonic push (Aixplorer) Comb push (GE Logiq E9) Detection of shear waves Motion detection from pulse-echo ultrasound Importance of frame rate for shear wave imaging Plane wave imaging detection How to achieve high effective frame rate using line-by-line scanners Shear wave speed calculation Time to peak Random sample consensus (RANSAC) Cross correlation Sources of bias and variation in SWE Tissue viscosity Transducer compression or internal pressure of organ Reflection of shear waves at boundaries B. Elasticity Imaging System Biomarker Qualification and User Testing of Systems – Brian Garra, M.D. Learning objectives-To understand: Goals Review the need for quantitative medical imaging Provide examples of quantitative imaging biomarkers Acquaint the participant with the purpose of the RSNA Quantitative Imaging

  18. TH-A-207B-02: QIBA Ultrasound Elasticity Imaging System Biomarker Qualification and User Testing of Systems

    Energy Technology Data Exchange (ETDEWEB)

    Garra, B. [FDA, Silver Spring, MD (United States)

    2016-06-15

    Imaging of tissue elastic properties is a relatively new and powerful approach to one of the oldest and most important diagnostic tools. Imaging of shear wave speed with ultrasound is has been added to most high-end ultrasound systems. Understanding this exciting imaging mode aiding its most effective use in medicine can be a rewarding effort for medical physicists and other medical imaging and treatment professionals. Assuring consistent, quantitative measurements across the many ultrasound systems in a typical imaging department will constitute a major step toward realizing the great potential of this technique and other quantitative imaging. This session will target these two goals with two presentations. A. Basics and Current Implementations of Ultrasound Imaging of Shear Wave Speed and Elasticity - Shigao Chen, Ph.D. Learning objectives-To understand: Introduction: Importance of tissue elasticity measurement Strain vs. shear wave elastography (SWE), beneficial features of SWE The link between shear wave speed and material properties, influence of viscosity Generation of shear waves External vibration (Fibroscan) ultrasound radiation force Point push Supersonic push (Aixplorer) Comb push (GE Logiq E9) Detection of shear waves Motion detection from pulse-echo ultrasound Importance of frame rate for shear wave imaging Plane wave imaging detection How to achieve high effective frame rate using line-by-line scanners Shear wave speed calculation Time to peak Random sample consensus (RANSAC) Cross correlation Sources of bias and variation in SWE Tissue viscosity Transducer compression or internal pressure of organ Reflection of shear waves at boundaries B. Elasticity Imaging System Biomarker Qualification and User Testing of Systems – Brian Garra, M.D. Learning objectives-To understand: Goals Review the need for quantitative medical imaging Provide examples of quantitative imaging biomarkers Acquaint the participant with the purpose of the RSNA Quantitative Imaging

  19. Evaluation of training programs and entry-level qualifications for nuclear-power-plant control-room personnel based on the systems approach to training

    International Nuclear Information System (INIS)

    Haas, P.M.; Selby, D.L.; Hanley, M.J.; Mercer, R.T.

    1983-09-01

    This report summarizes results of research sponsored by the US Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research to initiate the use of the Systems Approach to Training in the evaluation of training programs and entry level qualifications for nuclear power plant (NPP) personnel. Variables (performance shaping factors) of potential importance to personnel selection and training are identified, and research to more rigorously define an operationally useful taxonomy of those variables is recommended. A high-level model of the Systems Approach to Training for use in the nuclear industry, which could serve as a model for NRC evaluation of industry programs, is presented. The model is consistent with current publically stated NRC policy, with the approach being followed by the Institute for Nuclear Power Operations, and with current training technology. Checklists to be used by NRC evaluators to assess training programs for NPP control-room personnel are proposed which are based on this model

  20. Evaluation of training programs and entry-level qualifications for nuclear-power-plant control-room personnel based on the systems approach to training

    Energy Technology Data Exchange (ETDEWEB)

    Haas, P M; Selby, D L; Hanley, M J; Mercer, R T

    1983-09-01

    This report summarizes results of research sponsored by the US Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research to initiate the use of the Systems Approach to Training in the evaluation of training programs and entry level qualifications for nuclear power plant (NPP) personnel. Variables (performance shaping factors) of potential importance to personnel selection and training are identified, and research to more rigorously define an operationally useful taxonomy of those variables is recommended. A high-level model of the Systems Approach to Training for use in the nuclear industry, which could serve as a model for NRC evaluation of industry programs, is presented. The model is consistent with current publically stated NRC policy, with the approach being followed by the Institute for Nuclear Power Operations, and with current training technology. Checklists to be used by NRC evaluators to assess training programs for NPP control-room personnel are proposed which are based on this model.

  1. Selected fault testing of electronic isolation devices used in nuclear power plant operation

    International Nuclear Information System (INIS)

    Villaran, M.; Hillman, K.; Taylor, J.; Lara, J.; Wilhelm, W.

    1994-05-01

    Electronic isolation devices are used in nuclear power plants to provide electrical separation between safety and non-safety circuits and systems. Major fault testing in an earlier program indicated that some energy may pass through an isolation device when a fault at the maximum credible potential is applied in the transverse mode to its output terminals. During subsequent field qualification testing of isolators, concerns were raised that the worst case fault, that is, the maximum credible fault (MCF), may not occur with a fault at the maximum credible potential, but rather at some lower potential. The present test program investigates whether problems can arise when fault levels up to the MCF potential are applied to the output terminals of an isolator. The fault energy passed through an isolated device during a fault was measured to determine whether the levels are great enough to potentially damage or degrade performance of equipment on the input (Class 1E) side of the isolator

  2. Seismic and dynamic qualification of safety-related electrical and mechanical equipment in operating nuclear power plants: development of a method to generate generic floor-response spectra

    International Nuclear Information System (INIS)

    Curreri, J.; Costantino, C.; Subudhi, M.; Reich, M.

    1983-09-01

    Generic floor response spectra were developed for use in the qualification of electrical and mechanical equipment in operating nuclear power plants. The characteristics of 1000 floor response spectra were studied to determine the generic spectra. The procedure developed uses as much or as little information that currently exists at the plant relating to the question of equipment qualification. The general approach was to study the effects on the dynamic characteristics of each of the elements in the chain of events that goes between the loads and the responses. This includes the loads, the soils and the structures. A free-field earthquake response spectra was used to generate horizontal earthquake time histories. The excitation was applied through the soil and into the various structures to produce responses in equipment. An entire range of soil conditions was used with each structure. Actual PWR and BWR - Mark I structural models were used. For each model, the stiffness properties were varied, with the same mass, so as to extend the fundamental base structure natural frequency from 2 cps to 36 cps. The natural frequencies of the structures were varied to obtain maximum response conditions. The actual properties were first used to locate the natural frequencies. The stiffness properties were than varied, with the same mass, to extend the range of the fundamental base structure natural frequency. The intention was to have the coupled structural material frequencies in the vicinity of the peak amplitude frequency content of the excitation spectrum. Particular attention was therefore given to the frequency band between 2 Hz and 4 Hz. A horizontal generic floor response spectra is proposed for the top level of a generic structure. Reduction factors are applied to the peak acceleration for equipment at lower levels

  3. Non-destructive testing for plant life assessment

    International Nuclear Information System (INIS)

    2005-01-01

    The International Atomic Energy Agency (IAEA) is promoting industrial applications of nondestructive testing (NDT) technology, which includes radiography testing (RT) and related methods, to assure safety and reliability of operation of industrial facilities and processes. NDT technology is essentially needed for improvement of the quality of industrial products, safe performance of equipment and plants, including safety of metallic and concrete structures and constructions. The IAEA is playing an important role in promoting the NDT use and technology support to Member States, in harmonisation for training and certification of NDT personnel, and in establishing national accreditation and certifying bodies. All these efforts have led to a stage of maturity and self sufficiency in numerous countries especially in the field of training and certification of personnel, and in provision of services to industries. This has had a positive impact on the improvement of the quality of industrial goods and services. NDT methods are primarily used for detection, location and sizing of surface and internal defects (in welds, castings, forging, composite materials, concrete and many more). Various NDT methods are applied for preventive maintenance (aircraft, bridge), for the inspection of raw materials, half-finished and finished products, for in-service-inspection and for plant life assessment studies. NDT is essential for quality control of the facilities and products, and for fitness - for purpose assessment (so-called plant life assessment). NDT evaluates remaining operation life of plant components (processing lines, pipes, vessels) providing an accurate diagnosis that allows predicting extended life operation beyond design life. Status and trends on the NDT for plant life assessment have been discussed in many IAEA meetings related with NDT development, training and education. Experts have largely demonstrated that, using NDT methods, a comprehensive assessment of the life

  4. Round Robin Test for Performance Demonstration System of Ultrasound Examination Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Young Ho; Yang, Seung Han; Kim, Yong Sik; Yoon, Byung Sik; Lee, Hee Jong

    2005-01-01

    Ultrasound testing performance during in-service inspection for the main components of NPPs is strongly affected by each examination person. Therefore, ASME established a more strict qualification requirement in Sec. XI Appendix VIII for the ultrasound testing personnel in nuclear power plants. The Korean Performance Demonstration (KPD) System according to the ASME code for the ultrasonic testing personnel, equipments, and procedures to apply to the Class 1 and 2 piping ultrasound examination of nuclear power plants in Korea was established. And a round robin test was conducted in order to verify the effectiveness of PD method by comparing the examination results from the method of Performance Demonstration (PD) and a traditional ASME code dB-drop method. The round robin test shows that the reliability of the PD method is better than that of the dB-drop method. As a result, application of the PD method to the in-service inspection of the nuclear power plants will improve the performance of ultrasound testing

  5. Results of Cable Aging Management Tests for Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Garcia Hernandez, E.E.; Vazquez Cervantes, R.M.; Bonifacio M, J.; Garcia Garcia, J.

    2012-01-01

    Laguna Verde Nuclear Power Plant (LVNPP) located in Veracruz, Mexico is a BWR plant, two Units with 810 MWe each one, Unit 1 (1989) and Unit 2 (1990). The Equipment Qualification (EQ) Group at the Nuclear Research National Institute (ININ) has been working with the plant on tasks to develop the LVNPP cables Aging Management Program (AMP), as part of the technical basis to extend the operational life of the plant through license renewal up to 60 years. LVNPP cables are qualified for 40 years plus a LOCA DBA in accordance with 10.CFR 50.49 and the IEEE Std-323 and IEEE St. 383. The first studies for cables AMP have been performed with samples of safety related I and C cables taken from the LVNPP warehouse, similar brands and models as installed at the plant. ININ applied the condition monitoring techniques to these samples to identify predictive degradation and to establish the methodology for cables AMP, focused to the LVNPP license renewal. Cable tests program has been running at the EQ Lab in ININ, performing accelerated aging by steps up to 60 years and to 40 years plus a LOCA test. Determination for Activation Energy (Ea) and Oxidation Induction Time (OIT) methods were developed applying a DSC/TGA calorimeter. (author)

  6. 10 CFR 50.49 - Environmental qualification of electric equipment important to safety for nuclear power plants.

    Science.gov (United States)

    2010-01-01

    ... important to safety for nuclear power plants. 50.49 Section 50.49 Energy NUCLEAR REGULATORY COMMISSION... nuclear power plants. (a) Each holder of or an applicant for an operating license issued under this part... nuclear power plant for which the certifications required under § 50.82(a)(1) or § 52.110(a)(1) of this...

  7. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    The overall training system and the development projects of training the staff of all categories from NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce were the subject of UJD's attention. During 2001 following inspections were carried out on nuclear personnel training: - PP's Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff; - Mochovce NPP: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; - SE-VYZ: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff. Training the staff of the NPP's Bohunice: - The fundamental and periodical theoretical training as sure as the fundamental and periodical simulator training is carried out by the VUJE Training centre in Trnava. - The fundamental practical training in the workplace and training for the change work- rank is carried at Bohunice plant. Training of the staff of the NPP Mochovce: - The fundamental and periodical theoretical training is carried out by the VUJE Training centre in Trnava. The fundamental practical training in the workplace and training for the change work- rank as well as the fundamental and periodical simulator training is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues a certificate on special professional skills of selected staff members of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: 1. Scientific shift manager for start up with the right of manipulation; 2. Shift supervisor; 3. Unit supervisor; 4. Primary circuit operator; 5. Secondary circuit operator; 6. Reactor physicist; 7. Scientific shift manager for start up without the right of manipulation. Examinations of

  8. Nuclear Criticality Safety Department Qualification Program

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1996-01-01

    The Nuclear Criticality Safety Department (NCSD) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSD technical and managerial qualification as required by the Y-1 2 Training Implementation Matrix (TIM). This Qualification Program is in compliance with DOE Order 5480.20A and applicable Lockheed Martin Energy Systems, Inc. (LMES) and Y-1 2 Plant procedures. It is implemented through a combination of WES plant-wide training courses and professional nuclear criticality safety training provided within the department. This document supersedes Y/DD-694, Revision 2, 2/27/96, Qualification Program, Nuclear Criticality Safety Department There are no backfit requirements associated with revisions to this document

  9. Hanford Waste Vitrification Plant Quality Assurance Program description for high-level waste form development and qualification

    International Nuclear Information System (INIS)

    1993-08-01

    The Hanford Waste Vitrification Plant Project has been established to convert the high-level radioactive waste associated with nuclear defense production at the Hanford Site into a waste form suitable for disposal in a deep geologic repository. The Hanford Waste Vitrification Plant will mix processed radioactive waste with borosilicate material, then heat the mixture to its melting point (vitrification) to forin a glass-like substance that traps the radionuclides in the glass matrix upon cooling. The Hanford Waste Vitrification Plant Quality Assurance Program has been established to support the mission of the Hanford Waste Vitrification Plant. This Quality Assurance Program Description has been written to document the Hanford Waste Vitrification Plant Quality Assurance Program

  10. Waste Isolation Pilot Plant Salt Decontamination Testing

    Energy Technology Data Exchange (ETDEWEB)

    Rick Demmer; Stephen Reese

    2014-09-01

    On February 14, 2014, americium and plutonium contamination was released in the Waste Isolation Pilot Plant (WIPP) salt caverns. At the request of WIPP’s operations contractor, Idaho National Laboratory (INL) personnel developed several methods of decontaminating WIPP salt, using surrogate contaminants and also americium (241Am). The effectiveness of the methods is evaluated qualitatively, and to the extent possible, quantitatively. One of the requirements of this effort was delivering initial results and recommendations within a few weeks. That requirement, in combination with the limited scope of the project, made in-depth analysis impractical in some instances. Of the methods tested (dry brushing, vacuum cleaning, water washing, strippable coatings, and mechanical grinding), the most practical seems to be water washing. Effectiveness is very high, and it is very easy and rapid to deploy. The amount of wastewater produced (2 L/m2) would be substantial and may not be easy to manage, but the method is the clear winner from a usability perspective. Removable surface contamination levels (smear results) from the strippable coating and water washing coupons found no residual removable contamination. Thus, whatever is left is likely adhered to (or trapped within) the salt. The other option that shows promise is the use of a fixative barrier. Bartlett Nuclear, Inc.’s Polymeric Barrier System (PBS) proved the most durable of the coatings tested. The coatings were not tested for contaminant entrapment, only for coating integrity and durability.

  11. Reality testing a plant design 'virtually' anywhere

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The development of a new world-wide-web compatible information system known as HyperPlant will allow users to navigate real-time three-dimensional plant design and contraction software. It is anticipated that corporate Intranets will be created to facilitate computer-aided design of industrial plants such as piping routes, process schematics, fabrication drawings, and allow use of PDMS (the Plant Design Management System). HyperPlant can also assist in plant commissioning and operation as well as for planning operation and maintenance procedures. (UK)

  12. Data Qualification guidelines

    International Nuclear Information System (INIS)

    Edwards, T.B.; Shine, E.P.

    1992-01-01

    Data Qualification (DQ) is a formal, technical process whose objective is to affirm that experimental data are suitable for their intended use. Although it is not possible to develop a fixed recipe for the DQ process to cover all test situations, these general guidelines have been developed for the Nuclear Engineering Section to establish a framework for qualifying data from steady-state processing. These guidelines outline the role of the DQ team providing insight into the planning and conducting of the DQ process

  13. Development and qualification of a thermal-hydraulic nodalization for modeling station blackout accident in PSB-VVER test facility

    Energy Technology Data Exchange (ETDEWEB)

    Saghafi, Mahdi [Department of Energy Engineering, Sharif University of Technology, Azadi Avenue, Tehran (Iran, Islamic Republic of); Ghofrani, Mohammad Bagher, E-mail: ghofrani@sharif.edu [Department of Energy Engineering, Sharif University of Technology, Azadi Avenue, Tehran (Iran, Islamic Republic of); D’Auria, Francesco [San Piero a Grado Nuclear Research Group (GRNSPG), University of Pisa, Via Livornese 1291, San Piero a Grado, Pisa (Italy)

    2016-07-15

    Highlights: • A thermal-hydraulic nodalization for PSB-VVER test facility has been developed. • Station blackout accident is modeled with the developed nodalization in MELCOR code. • The developed nodalization is qualified at both steady state and transient levels. • MELCOR predictions are qualitatively and quantitatively in acceptable range. • Fast Fourier Transform Base Method is used to quantify accuracy of code predictions. - Abstract: This paper deals with the development of a qualified thermal-hydraulic nodalization for modeling Station Black-Out (SBO) accident in PSB-VVER Integral Test Facility (ITF). This study has been performed in the framework of a research project, aiming to develop an appropriate accident management support tool for Bushehr nuclear power plant. In this regard, a nodalization has been developed for thermal-hydraulic modeling of the PSB-VVER ITF by MELCOR integrated code. The nodalization is qualitatively and quantitatively qualified at both steady-state and transient levels. The accuracy of the MELCOR predictions is quantified in the transient level using the Fast Fourier Transform Base Method (FFTBM). FFTBM provides an integral representation for quantification of the code accuracy in the frequency domain. It was observed that MELCOR predictions are qualitatively and quantitatively in the acceptable range. In addition, the influence of different nodalizations on MELCOR predictions was evaluated and quantified using FFTBM by developing 8 sensitivity cases with different numbers of control volumes and heat structures in the core region and steam generator U-tubes. The most appropriate case, which provided results with minimum deviations from the experimental data, was then considered as the qualified nodalization for analysis of SBO accident in the PSB-VVER ITF. This qualified nodalization can be used for modeling of VVER-1000 nuclear power plants when performing SBO accident analysis by MELCOR code.

  14. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Oliver [European Commission, Joint Research Centre (JRC), Petten (Netherlands). Institute for Energy and Transport (IET); Martin, Etienne [EDF, St Denis (France). Direction Production Ingenierie; Booler, Russ [AMEC Clean Energy Europe, Warrington (United Kingdom); Zetterwall, Tommy [Swedish Qualification Centre, Taeby (Sweden); Walker, Tony [Rolls-Royce Submarines, Derby (United Kingdom)

    2014-10-15

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8{sup th} technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  15. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    International Nuclear Information System (INIS)

    Martin, Oliver; Martin, Etienne; Zetterwall, Tommy; Walker, Tony

    2014-01-01

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8 th technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  16. Solar array qualification through qualified analysis

    Science.gov (United States)

    Zijdemans, J.; Cruijssen, H. J.; Wijker, J. J.

    1991-04-01

    To achieve qualification is in general a very expensive exercise. For solar arrays this is done by a dedicated test program through which final qualification is achieved. Due to severe competition on the solar array market, cheaper means are looked for to achieve a qualified product for the customers. One of the methods is to drastically limit the environmental test program and to qualify the solar-array structure against its environmental loads by analysis. Qualification by analysis is possible. The benefits are that a significant amount of development effort can be saved in case such a powerful tool is available. Extensive testing can be avoided thus saving time and money.

  17. High Temperature Materials Interim Data Qualification Report FY 2011

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2011-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim fiscal year (FY) 2011 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under the Nuclear Quality Assurance (NQA)-1 guidelines and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from seven test series within the High Temperature Materials data stream have been entered into the NDMAS vault, including tensile tests, creep tests, and cyclic tests. Of the 5,603,682 records currently in the vault, 4,480,444 have been capture passed, and capture testing is in process for the remaining 1,123,238.

  18. Evaluation of environmental qualification period for Conax electrical penetration assemblies. Final report

    International Nuclear Information System (INIS)

    Doroshuk, B.; Hager, M.; Brown, R.

    1995-05-01

    This report evaluates the environmental qualification period of Conax electrical penetration assemblies (EPAs) for extension from forty (40) years to sixty (60) years. The evaluation was performed based on a review of Conax EPAs supplied to Baltimore Gas ampersand Electric's (BGE) Calvert Cliffs Nuclear Power Plant Units 1 and 2. The report has been prepared so that it may be of use to any utility involved in the extension of the environmental qualification period for Conax EPAs installed in their plant(s). The report includes a section on the strategy which was developed for the effort to extend the qualified lives of the Conax EPAs. A review of documentation and plant conditions specific to BGE is included in the report to demonstrate the methodology. The documentation included qualification testing performed by Conax of the materials of construction of the EPA models. The plant conditions reviewed included both normal and accident environments, both of which are specific to Calvert Cliffs Nuclear Power Plant Units 1 and 2. This report can be used as a guide in the evaluation of similar installations of Conax electrical penetration assemblies in other nuclear power plants by applying the methodologies used herein in conjunction with the plant specific test reports, materials, and conditions

  19. Hanford Waste Vitrification Plant quality assurance program description for defense high-level waste form development and qualification

    International Nuclear Information System (INIS)

    Hand, R.L.

    1990-12-01

    The US Department of Energy-Office of Civilian Radioactive Waste Management has been designated the national high-level waste repository licensee and the recipient for the canistered waste forms. The Office of Waste Operations executes overall responsibility for producing the canistered waste form. The Hanford Waste Vitrification Plant Project, as part of the waste form producer organization, consists of a vertical relationship. Overall control is provided by the US Department of Energy-Environmental Restoration and Waste Management Headquarters; with the US Department of Energy-Office of Waste Operations; the US Department of Energy- Headquarters/Vitrification Project Branch; the US Department of Energy-Richland Operations Office/Vitrification Project Office; and the Westinghouse Hanford Company, operations and engineering contractor. This document has been prepared in response to direction from the US Department of Energy-Office of Civilian Radioactive Waste Management through the US Department of Energy-Richland Operations Office for a quality assurance program that meets the requirements of the US Department of Energy. This document provides guidance and direction for implementing a quality assurance program that applies to the Hanford Waste Vitrification Plant Project. The Hanford Waste Vitrification Plant Project management commits to implementing the quality assurance program activities; reviewing the program periodically, and revising it as necessary to keep it current and effective. 12 refs., 6 figs., 1 tab

  20. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  1. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  2. Workshop on environmental qualification of electric equipment

    International Nuclear Information System (INIS)

    Lofaro, R.; Gunther, W.; Villaran, M.; Lee, B.S.; Taylor, J.

    1994-05-01

    Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratories (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing

  3. Workshop on environmental qualification of electric equipment

    Energy Technology Data Exchange (ETDEWEB)

    Lofaro, R.; Gunther, W.; Villaran, M.; Lee, B.S.; Taylor, J. [comps.] [Brookhaven National Lab., Upton, NY (United States)

    1994-05-01

    Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratories (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing.

  4. Seismic qualification of a commercial grade emergency diesel generator system in high seismic zones

    International Nuclear Information System (INIS)

    Khan, Mohsin R.; Chen, Wayne W.H.; Chu, Winnie S.

    2004-01-01

    The paper presents the seismic qualification of a commercially procured emergency diesel generator (EDG) system for use in a nuclear power plant. Response spectrum analyses of finite element models, validated using in situ vibration test data, were performed to qualify the skid and floor mounted mechanical components whose functional capacity and structural integrity can be analyzed. Time history analyses of these models were also performed to obtain the amplified response spectra for seismic testing of small valves, electrical and electro-mechanical components whose functional capacity can not be analyzed to establish the seismic qualification. The operational loads were obtained by in-plant vibration monitoring. Full scale shake table testing was performed for auxiliary electrical cabinets. It is concluded that with some minor structural modifications, a commercial grade EDG system can be qualified for safety-related applications in nuclear power plants located in high seismic zones. (author)

  5. Safety design guides for environmental qualification for CANDU 9

    International Nuclear Information System (INIS)

    Lee, Duk Su; Chang, Woo Hyun; Lee, Nam Young; A. C. D. Wright

    1996-03-01

    This safety design guide describes the safety philosophy and requirements for the environmental qualification of safety related systems and components for CANDU 9. The environmental qualification program identifies the equipments to be qualified and conditions to be used for qualification and provides comprehensive set of documentation to ensure that the qualification is complete and can be maintained for the life of the plant. A summary of the system, components and structures requiring environmental qualification is provided in the table for the guidance of the system design, and this table will be subject to change or confirmation by the environmental qualification program. Also, plant ares subject to harsh environment is provided in the figure. The change status of the regulatory requirements, code and standards should be traced and this safety design guide shall be updated accordingly. 1 tab., 5 figs. (Author) .new

  6. Relationship between Air Traffic Selection and Training (AT-SAT)) Battery Test Scores and Composite Scores in the Initial en Route Air Traffic Control Qualification Training Course at the Federal Aviation Administration (FAA) Academy

    Science.gov (United States)

    Kelley, Ronald Scott

    2012-01-01

    Scope and Method of Study: This study focused on the development and use of the AT-SAT test battery and the Initial En Route Qualification training course for the selection, training, and evaluation of air traffic controller candidates. The Pearson product moment correlation coefficient was used to measure the linear relationship between the…

  7. Nuclear power plant personnel qualifications and training. TSORT: an automated technique to assign tasks to training strategies. Volume 1

    International Nuclear Information System (INIS)

    Jorgensen, C.C.

    1984-10-01

    This report discusses TSORT, a technique to assist the Nuclear Regulatory Commission (NRC) in evaluating whether training program developers have allocated nuclear power plant tasks to appropriate training strategies. The TSORT structure is presented including training categories selected, dimensions of task information considered, measurement metrics used, and a guide to application. TSORT is implemented as an automated software tool for an IBM-PC. It uses full color graphics and interactive menu selection to provide NRC with a variety of evaluation options including: rank ordering of training strategies reasonable for each task, rank ordering of tasks within strategies, and a variety of special analyses. The program code is also presented along with a comprehensive example of 20 realistic tasks illustrating each of 17 options available

  8. Ageing management and equipment qualification

    International Nuclear Information System (INIS)

    Stahl, Gunnar

    2014-01-01

    The knowledge of how the environment and load of organic material in general and especially polymers and lubricants, is affecting the degradation of important properties, have increased during the last decade. However the restrictions using established additives like some color pigments due to their poisonousness e.g. pigments based at cadmium, lead, mercury etc. have caused problems when replacing additives to polymers. The replacement additives have often been used in new design without going through the required material qualification procedure. There have also been observed that some non-qualified and non-approved materials have been installed in some power plants due to false documentation. There are also a lot of new manufacturers, of materials similar to the previously qualified materials, active at the market. This increases the difficulty to ensure that the required material quality is used. New materials, new additives and new manufacturers makes if more and more difficult to assure that the expected material is present. This causes more strict demands of how the new materials often used in equipment at type-testing and in replacement materials are analyzed and documented. By implementing new steps for chemical, mechanical and electrical analysis and increase the general quality assurance content this issue can be managed. (authors)

  9. Qualification of anticorrosive coatings in nuclear vessels

    International Nuclear Information System (INIS)

    Perez Flores, C.

    1985-01-01

    Test qualifications of the behavior of anticorrosive coating systems used in nuclear vessels in service and under the accident conditions of radiation decontamination, steam chemical resistance, thermal conductivity, weathering accelerated aging are presented and discussed. (author)

  10. TERRESTRIAL PLANT REPRODUCTIVE TESTING: SHOULD WILDLIFE TOXICOLOGISTS CARE?

    Science.gov (United States)

    Standard phytotoxicity testing using the seedling emergence and vegetative vigor tests have been shown to be inadequate for the protection of plant reproduction. Both experimental evidence and unintended field exposures have shown vegetation can be minimally or not significantly...

  11. Specification and qualification of fire detectors used in very high radiation rooms at the Angra-2 nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Sá, Luís Gustavo S.; Oliveira, Alisson S. de; Donorato, Fernando da S.; Oliveira, Marcos Vinicius M. de, E-mail: luisg@eletronuclear.gov.br, E-mail: alison@eletronuclear.gov.br, E-mail: donora@eletronuclear.gov.br, E-mail: marcoso@eletronuclear.gov.br [Eletrobrás Termonuclear S.A. (ELETRONUCLEAR), Angra dos Reis, RJ (Brazil). Departamento GDD.O

    2017-07-01

    During the Operation cycle 11 of the Angra-2 Nuclear Power Plant, faults were observed in the optical and ionic fire detectors models installed in very high radiation rooms (pump reactor rooms and sump containment). It was observed that these models were already obsolete and no available for purchase. In addition, as during the operation cycle these rooms are not accessible for maintenance because of the high dose rates, corrective measures only were taken at Outage 2P11 where all detectors were replaced by the new neural fire detector model. This high-tech model was not sufficiently resistant to the high dose rates of the environment rooms and starts to fail in the beginning of the cycle 11. Thereafter, a specific engineering work was developed in partnership with IPEN - Institute of Energy and Nuclear Research to specify and qualify a new model compatible with the electronic Central of the Fire Detection System and Alarm and at the same time resistant to radiation. The fire detectors were subjected to a known gamma radiation rate at the laboratory facilities of IPEN through the gamma irradiation equipment with cobalt radiation source. In this way, it was possible to determine its useful life comparing the total dose absorbed for detector failure and the environmental dose where it was installed in Angra-2. The current approved model was installed during Outage 2P13, and until now, no spurious alarms or failure were observed during the current cycle. (author)

  12. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2001-01-01

    The overall training system and the development of projects for training of all categories of NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce staff were the subject of Nuclear Regulatory Authority of the Slovak Republic (UJD) attention. During 2000, the following inspections were carried out on nuclear personnel training: (a) NPP Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff ; (b) NPP Mochovce: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; an inspection focused on verifying the simulator aided training; an inspection focused on checking the preparedness of NPP Mochovce operation and technical personnel for NPP Mochovce Unit 2 operation; (c) Technology for treatment and conditioning of radioactive waste Bohunice (BSC): an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff; VUJE Trnava: verification of technical equipment and professional skills of VUJE Trnava staff and tasks arising out of the 'Authorisation on nuclear installation staff training'. Examinations of selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPPs. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under

  13. Qualification by analogy of the functional valving of French pressurized water nuclear power stations

    International Nuclear Information System (INIS)

    Grenet, M.

    1991-01-01

    In certain postulated accidental conditions (loss of coolant accident or secondary pipe rupture, earthquake, high energy pipe rupture) plant valving is called on the important functions to bring the reactor to and maintain it at a safe shutdown condition. ELWCTRICITE DE FRANCE has completed qualification tests of about forty valves to assure their operability. However, taking into account the costs and time required to obtain this qualification and the number of valves to be qualified, this method alone is not sufficient. For this reason, Electricite de France has developed the alternative qualification methodology by analogy for each postulated accidental situation. Feedback experience of these methods today is such that it can be they have achieved their objective; namely, to improve the safety of French pressurized water nuclear power stations, while at the same time avoiding the two dangers represented by excessive complexity resulting in unsatisfactory operation, and insufficient thoroughness not providing any real increase in safety. (author)

  14. Experience with RTD response time testing in nuclear power plants

    International Nuclear Information System (INIS)

    Hashemian, H.M.; Kerlin, T.W.

    1985-01-01

    The reactor coolant temperatures in pressurized water reactors are measured with platinum resistance temperature detectors (RTDs). The information furnished by these RTDs is used for plant protection as well as control. As a part of the plant protection system, the RTDs must respond to temperature changes in a timely fashion. The RTD response time requirements are different for the various plant types. These requirements are specified in the plant technical specifications in terms of an RTd time constant. The current time constant requirements for nuclear plant RTDs varies from 0.5 seconds to 13.0 seconds depending on the type of the plant. Therefore, different types of RTDs are used in different plants to achieve the required time constants. In addition, in-situ response time tests are periodically performed on protective system RTDs to ensure that the in-service time constants are within acceptable limits as the plant is operating. The periodic testing is important because response time degradation may occur while the RTD ages in the process. Recent response time tests in operating plants revealed unacceptable time constants for several protection system RTDs. As a result, these plants had to be shut down to resolve the problem which in one case was due to improper installation and in another case was because of degradation of a thermal compound used in the thermowell

  15. TOUGH2 software qualification

    International Nuclear Information System (INIS)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM (open-quotes MULti-KOMponentclose quotes) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2

  16. TOUGH2 software qualification

    Energy Technology Data Exchange (ETDEWEB)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM ({open_quotes}MULti-KOMponent{close_quotes}) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2.

  17. Qualification and certification in NDT

    International Nuclear Information System (INIS)

    Hassan Kavarodi Maracair

    2003-01-01

    Ruane-TATI Sdn Bhd was the first accredited training centre in Asia approved by The British Institute of Non Destructive Testing (BINDT) as per EN 473, ISO 9712 and EN 45013 requirements. Meanwhile, Ruane-TATI is also accredited by National Vocational Training Center ( MLVK ).This mean that Ruane-TATI is the first training and examination center that accredited by both international and national bodies in providing quality , qualification and certification for comprehensive training and examination in Inspection and Non Destructive Testing (NDT). There are several NDT examinations scheme available in Malaysia due to differences requirement from the industrials. This has put the difficulties to services company in upgrading their NDT technician qualifications. The intention of this paper is to discuss the basic different among the NDT examinations scheme used in Malaysia ( mostly offered by Ruane-TATI ) and the development of certain schemes in covering their schemes to more sectors and NDT methods. (Author)

  18. Melter operation results in chemical test at Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Kanehira, Norio; Yoshioka, Masahiro; Muramoto, Hitoshi; Oba, Takaaki; Takahashi, Yuji

    2005-01-01

    Chemical Test of the glass melter system of the Vitrification Facility at Rokkasho Reprocessing Plant (RRP) was performed. In this test, basic performance of heating-up of the melter, melting glass, pouring glass was confirmed using simulated materials. Through these tests and operation of all modes, good results were gained, and training of operators was completed. (author)

  19. Test plan for qualification of the S-type fiberglass materials for use as the liquid observation well casing

    International Nuclear Information System (INIS)

    Parra, S.A.

    1995-01-01

    This test plan presents the guidelines and requirements for acceptance of the S-type fiberglass material for use as the liquid observation well casing material. The plan for evaluating the physical properties of the candidate fiberglass materials when subjected to radiation, corrosive chemicals, and high temperatures typically found in the waste tanks are outlined. The tests also include tube connection evaluations. Finally, the test plan identifies the participants, their responsibilities, and the schedule for completion of the work

  20. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  1. USING POTATOES IN PROPAGATION TESTS FOR NONTARGET PLANT EFFECTS

    Science.gov (United States)

    Current tests required for pesticide registration under the FIFRA only investigate seedling emergence and early growth. Previous research with sulfonylurea (SU) herbicides has shown that significant impacts can occur to plant reproduction with little or no visible effect on vege...

  2. Inspector qualification guidelines

    International Nuclear Information System (INIS)

    Batty, A.C.; Van Binnebeek, J.J.; Ericsson, P.O.; Fisher, J.C.; Geiger, P.; Grandame, M.; Grimes, B.K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-01

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied

  3. Inspector qualification guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Batty, A. C.; Van Binnebeek, J. J.; Ericsson, P. O.; Fisher, J. C.; Geiger, P.; Grandame, M.; Grimes, B. K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-15

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied.

  4. Final Assembly, Testing and Processing of the Rigidizable Inflatable Get-Away-Special Experiment (RIGEX) for Spaceflight Qualification

    Science.gov (United States)

    2007-09-01

    Determined heating profile of tubes, Verified Piezo patch funtionability after heating, Full Scale Deployment Test, Pressure System Test, SERB - Moody...Ohm Resistor (Vishay Dale) 1 704.910.3 EAO Impulse Switch 1 H335111200 Current Display (Simpson) 1 MB 2061SS1W01- CA Bushing Mount Miniature

  5. Analysis and Experimental Qualification of an Irradiation Capsule Design for Testing Pressurized Water Reactor Fuel Cladding in the High Flux Isotope Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Kurt R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howard, Richard H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Daily, Charles R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Petrie, Christian M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    The Advanced Fuels Campaign within the Fuel Cycle Research and Development program of the Department of Energy Office of Nuclear Energy is currently investigating a number of advanced nuclear fuel cladding concepts to improve the accident tolerance of light water reactors. Alumina-forming ferritic alloys (e.g., FeCrAl) are some of the leading candidates to replace traditional zirconium alloys due to their superior oxidation resistance, provided no prohibitive irradiation-induced embrittlement occurs. Oak Ridge National Laboratory has developed experimental designs to irradiate thin-walled cladding tubes with representative pressurized water reactor geometry in the High Flux Isotope Reactor (HFIR) under relevant temperatures. These designs allow for post-irradiation examination (PIE) of cladding that closely resembles expected commercially viable geometries and microstructures. The experiments were designed using relatively inexpensive rabbit capsules for the irradiation vehicle. The simplistic designs combined with the extremely high neutron flux in the HFIR allow for rapid testing of a large test matrix, thus reducing the time and cost needed to advanced cladding materials closer to commercialization. The designs are flexible in that they allow for testing FeCrAl alloys, stainless steels, Inconel alloys, and zirconium alloys (as a reference material) both with and without hydrides. This will allow a direct comparison of the irradiation performance of advanced cladding materials with traditional zirconium alloys. PIE will include studies of dimensional change, microstructure variation, mechanical performance, etc. This work describes the capsule design, neutronic and thermal analyses, and flow testing that were performed to support the qualification of this new irradiation vehicle.

  6. Technology and testing for the extension of plant life

    International Nuclear Information System (INIS)

    Blumer, U.R.; Edelmann, X.

    1988-01-01

    This paper describes selected portions of a recommended program for the application of equipment-manufacturing-related technology and testing for the extension of life for operating nuclear power plants. It is appropriate to mention that the Swiss nuclear plants, their staffs, and the supporting Swiss nuclear industry are rightfully proud of their record of performance. Plant staffs have been intimately involved in system and equipment design and engineering from the very beginnings of their plants. Maintenance of the plant systems and equipment is referred to as engineering rather than maintenance, because it is viewed as a technical effort and an extension of the original plant and equipment design and construction effort. Care, competence, cleanliness, and attention to detail have been bywords for the Swiss plants. Success has been demonstrated through enviable availability performance. With operation and availability capability already demonstrated, the Swiss are now turning their attention to the extension of plant life. This summary describes some aspects of this work, which is fundamentally based on the application of technology and testing skills developed for equipment manufacture and the original installation of this equipment in the plants, but has been enhanced by research and development (R and D) and an ongoing effort to serve utilities in their maintenance activities

  7. AGR-1 Data Qualification Report

    International Nuclear Information System (INIS)

    Abbott, Michael

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office (TDO) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor experiment (AGR-1), the processing of these data within NDMAS, and reports the qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. They include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent quality assurance program. The NDMAS database processing and qualification status of the following five data streams is reported in this document: (1) Fuel fabrication data. All data have been processed into the NDMAS database and qualified (1,819 records). (2) Fuel irradiation data. Data from all 13 AGR-1 reactor cycles have been processed into the NDMAS database and tested. Of these, 85% have been qualified and 15% have failed NDMAS accuracy testing. (3) FPMS data. Reprocessed (January 2010) data from all 13 AGR-1 reactor cycles have been processed into the database and capture tested. Final qualification of these data will be recorded after QA approval of an Engineering Calculations and Analysis Report currently

  8. Advanced qualification techniques

    International Nuclear Information System (INIS)

    Winokur, P.S.; Shaneyfelt, M.R.; Meisenheimer, T.L.; Fleetwood, D.M.

    1993-01-01

    This paper demonstrates use of the Qualified Manufacturers List (QML) methodology to qualify commercial and military microelectronics for use in space applications. QML ''builds in'' the hardness of product through statistical process control (SPC) of technology parameters relevant to the radiation response, test structure to integrated circuit (IC) correlations, and techniques for extrapolating laboratory test results to low-dose-rate space scenarios. Each of these elements is demonstrated and shown to be a cost-effective alternative to expensive end-of-line IC testing. Several examples of test structured-IC correlations are provided and recent work on complications arising from transistor scaling and geometry is discussed. The use of a 10-keV x-ray wafer-level test system to support SPC and establish ''process capability'' is illustrated and a comparison of 10-keV x-ray and Co 60 gamma irradiations is provided for a wide range of CMOS technologies. The x-ray tester is shown to be cost-effective and its use in lot acceptance/qualification is recommended. Finally, a comparison is provided between MIL-STD-883D, Test Method 1019.4, which governs the testing of packaged semiconductor microcircuits in the DoD, and ESA/SSC Basic Specification No. 22900, Europe's Total Dose Steady-State Irradiation Test Method. Test Method 1019.4 focuses on conservative estimates of MOS hardness for space and tactical applications, while Basic Specification 22900 focuses on improved simulation of low-dose-rate space environments

  9. The qualification of reactor operators

    International Nuclear Information System (INIS)

    Lima, J.M. de; Soares, H.V.

    1981-01-01

    The qualification and performance of nuclear power personnel have an important influence on the availability and safety operation of these plants. This paper describes the Brazilian rules and norms established by the CNEN-Brazilian Atomic Energy Comission, as well as policy of other countries concerning training requirements and experiences of nuclear power reactor operators. Some coments are made about the im pact of the march 1979 Three Mile Island accident on upgrading the reactor training requirements in U.S.A. and its international implication. (Author) [pt

  10. Testing methodology of embedded software in digital plant protection system

    International Nuclear Information System (INIS)

    Seong, Ah Young; Choi, Bong Joo; Lee, Na Young; Hwang, Il Soon

    2001-01-01

    It is necessary to assure the reliability of software in order to digitalize RPS(Reactor Protection System). Since RPS causes fatal damage on accidental cases, it is classified as Safety 1E class. Therefore we propose the effective testing methodology to assure the reliability of embedded software in the DPPS(Digital Plant Protection System). To test the embedded software effectively in DPPS, our methodology consists of two steps. The first is the re-engineering step that extracts classes from structural source program, and the second is the level of testing step which is composed of unit testing, Integration Testing and System Testing. On each testing step we test the embedded software with selected test cases after the test item identification step. If we use this testing methodology, we can test the embedded software effectively by reducing the cost and the time

  11. Demonstration test for reliability of valves for atomic power plants

    International Nuclear Information System (INIS)

    Hosaka, Shiro

    1978-01-01

    The demonstration test on the reliability of valves for atomic power plants being carried out by the Nuclear Engineering Test Center is reported. This test series is conducted as six-year project from FY 1976 to FY 1981 at the Isogo Test Center. The demonstration test consists of (1) environmental test, (2) reaction force test, (3) vibration test, (4) stress measurement test, (5) operational characteristic test, (6) flow resistance coefficient measuring test, (7) leakage test and (8) safety valve and relief valve test. These contents are explained about the special requirements for nuclear use, for example, the enviornmental condition after the design base accident of PWRs and BWRs, the environmental test sequence for isolation valves of containment vessels under the emergency condition, the seismic test condition for valves of nuclear use, the various stress measurements under thermal transient conditions, the leak test after 500 cycles between the normal operating conditions for PWRs and BWRs and the start up conditions and so on. As for the testing facilities, the whole flow diagram is shown, in which the environmental test section, the vibration test section, the steam test section, the hot water test section, the safety valve test section and main components are included. The specifications of each test section and main components are presented. (Nakai, Y.)

  12. On-Demand Testing and Maintaining Standards for General Qualifications in the UK Using Item Response Theory: Possibilities and Challenges

    Science.gov (United States)

    He, Qingping

    2012-01-01

    Background: Although on-demand testing is being increasingly used in many areas of assessment, it has not been adopted in high stakes examinations like the General Certificate of Secondary Education (GCSE) and General Certificate of Education Advanced level (GCE A level) offered by awarding organisations (AOs) in the UK. One of the major issues…

  13. The effects of radiation on various materials and the qualification tests required for their use in medical devices

    International Nuclear Information System (INIS)

    Landfield, H.

    1980-01-01

    Many polymers used in the medical field show various degrees of degradation after radiation exposure either by visual or physical measurements. The general effects of radiation on such medical polymers are reviewed and discussed as well as the tests used to qualify their performance. (author)

  14. Reduction in size of bottom-mounted reactivity control mechanism of research reactor for seismic qualification test

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Jongoh; Kim, Gyeongho; Yoo, Yeonsik; Cho, Yeonggarp; Kim, Jongin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-07-01

    A new research reactor employing bottom-mounted reactivity control mechanism (RCM) is under development and its safety function which is a shutdown of the reactor under earthquake events should be verified through a test. However, the real system is too heavy to be excited artificially, and hence the size of a test rig should be reduced somehow. As a preliminary study for development of a seismic test rig, this paper presents how to reduce the length of an extension shaft which is a main component of RCM while it maintains dynamic characteristics of the real system. In this paper, instead of reduction in length of the shaft, the inner/outer radius of the shaft and water gap size between the shaft and its guide tube will be modified in order to match its natural frequency and displacement due to seismic excitation to those of the real system. Furthermore, a proper mass which does not increase the stiffness will be inserted into the hollow shaft. Then, dynamic equation was derived for the beam model and an optimization problem was defined and solved. The result shows that the design modification is reasonable for description of dynamic characteristics of the real system under earthquake events.

  15. Reduction in size of bottom-mounted reactivity control mechanism of research reactor for seismic qualification test

    International Nuclear Information System (INIS)

    Sun, Jongoh; Kim, Gyeongho; Yoo, Yeonsik; Cho, Yeonggarp; Kim, Jongin

    2013-01-01

    A new research reactor employing bottom-mounted reactivity control mechanism (RCM) is under development and its safety function which is a shutdown of the reactor under earthquake events should be verified through a test. However, the real system is too heavy to be excited artificially, and hence the size of a test rig should be reduced somehow. As a preliminary study for development of a seismic test rig, this paper presents how to reduce the length of an extension shaft which is a main component of RCM while it maintains dynamic characteristics of the real system. In this paper, instead of reduction in length of the shaft, the inner/outer radius of the shaft and water gap size between the shaft and its guide tube will be modified in order to match its natural frequency and displacement due to seismic excitation to those of the real system. Furthermore, a proper mass which does not increase the stiffness will be inserted into the hollow shaft. Then, dynamic equation was derived for the beam model and an optimization problem was defined and solved. The result shows that the design modification is reasonable for description of dynamic characteristics of the real system under earthquake events

  16. Test requirements for the integral effect test to simulate Korean PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chul Hwa; Park, C. K.; Lee, S. J.; Kwon, T. S.; Yun, B. J.; Chung, M. K

    2001-02-01

    In this report, the test requirements are described for the design of the integral effect test facility to simulate Korean PWR plants. Since the integral effect test facility should be designed so as to simulate various thermal hydraulic phenomena, as closely as possible, to be occurred in real plants during operation or anticipated transients, the design and operational characteristics of the reference plants (Korean Standard Nuclear Plant and Korean Next Generation Reactor)were analyzed in order to draw major components, systems, and functions to be satisfied or simulated in the test facility. The test matrix is set up by considering major safety concerns of interest and the test objectives to confirm and enhance the safety of the plants. And the analysis and prioritization of the test matrix leads to the general design requirements of the test facility. Based on the general design requirements, the design criteria is set up for the basic and detailed design of the test facility. And finally it is drawn the design requirements specific to the fluid system and measurement system of the test facility. The test requirements in this report will be used as a guideline to the scaling analysis and basic design of the test facility. The test matrix specified in this report can be modified in the stage of main testing by considering the needs of experiments and circumstances at that time.

  17. Test requirements for the integral effect test to simulate Korean PWR plants

    International Nuclear Information System (INIS)

    Song, Chul Hwa; Park, C. K.; Lee, S. J.; Kwon, T. S.; Yun, B. J.; Chung, M. K.

    2001-02-01

    In this report, the test requirements are described for the design of the integral effect test facility to simulate Korean PWR plants. Since the integral effect test facility should be designed so as to simulate various thermal hydraulic phenomena, as closely as possible, to be occurred in real plants during operation or anticipated transients, the design and operational characteristics of the reference plants (Korean Standard Nuclear Plant and Korean Next Generation Reactor)were analyzed in order to draw major components, systems, and functions to be satisfied or simulated in the test facility. The test matrix is set up by considering major safety concerns of interest and the test objectives to confirm and enhance the safety of the plants. And the analysis and prioritization of the test matrix leads to the general design requirements of the test facility. Based on the general design requirements, the design criteria is set up for the basic and detailed design of the test facility. And finally it is drawn the design requirements specific to the fluid system and measurement system of the test facility. The test requirements in this report will be used as a guideline to the scaling analysis and basic design of the test facility. The test matrix specified in this report can be modified in the stage of main testing by considering the needs of experiments and circumstances at that time

  18. Testing of mobile surveillance robot at a nuclear power plant

    International Nuclear Information System (INIS)

    White, J.R.; Harvey, H.W.; Farnstrom, K.A.

    1987-01-01

    In-plant testing of a mobile surveillance robot (SURBOT) was performed at the Browns Ferry Nuclear Plant by TVA personnel. The results verified that SURBOT can be used for remote surveillance in 54 separate controlled radiation rooms at the plant. High-quality color video, audio, and other data are collected, digitized by an on-board computer, and transmitted through a cable to the control console for real-time display and videotaping. TVA projects that the use of SURBOT for surveillance during plant operation will produce annual savings of about 100 person-rem radiation exposure and $200,000 in operating costs. Based on the successful results of this program, REMOTEC is now commercializing the SURBOT technology on both wheeled and tracked mobile robots for use in nuclear power plants and other hazardous environments

  19. Pilot plant UF6 to UF4 test operations report

    International Nuclear Information System (INIS)

    Bicha, W.J.; Fallings, M.; Gilbert, D.D.; Koch, G.E.; Levine, P.J.; McLaughlin, D.F.; Nuhfer, K.R.; Reese, J.C.

    1987-02-01

    The FMPC site includes a plant designed for the reduction of uranium hexafluoride (UF 6 ) to uranium tetrafluoride (UF 4 ). Limited operation of the upgraded reduction facility began in August 1984 and continued through January 19, 1986. A reaction vessel ruptured on that date causing the plant operation to be shut down. The DOE conducted a Class B investigation with the findings of the investigation board issued in preliminary form in May 1986 and as a final recommendation in July 1986. A two-phase restart of the plant was planned and implemented. Phase I included implementing safety system modifications, changing reaction vessel temperature control strategy, and operating the reduction plant under an 8-week controlled test. The results of the test period are the subject of this report. 41 figs., 11 tabs

  20. Minimum qualifications for nuclear criticality safety professionals

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1990-01-01

    A Nuclear Criticality Technology and Safety Training Committee has been established within the U.S. Department of Energy (DOE) Nuclear Criticality Safety and Technology Project to review and, if necessary, develop standards for the training of personnel involved in nuclear criticality safety (NCS). The committee is exploring the need for developing a standard or other mechanism for establishing minimum qualifications for NCS professionals. The development of standards and regulatory guides for nuclear power plant personnel may serve as a guide in developing the minimum qualifications for NCS professionals

  1. Pilot plant for flue gas treatment - continuous operation tests

    International Nuclear Information System (INIS)

    Chmielewski, A.G.; Tyminski, B.; Iller, E.; Zimek, Z.; Licki, J.; Radzio, B.

    1995-01-01

    Tests of continuous operation have been performed on pilot plant at EPS Kaweczyn in the wide range of SO 2 concentration (500-3000 ppm). The bag filter has been applied for aerosol separation. The high efficiencies of SO 2 and NO x removal, approximately 90% were obtained and influenced by such process parameters as: dose, gas temperature and ammonia stoichiometry. The main apparatus of the pilot plant (e.g. both accelerators) have proved their reliability in hard industrial conditions. (Author)

  2. Performance of brazed graphite, carbon-fiber composite, and TZM materials for actively cooled structures: qualification tests

    International Nuclear Information System (INIS)

    Smid, I.; Croessmann, C. D.; Watson, R. D.; Linke, J.; Cardella, A.; Bolt, H.; Reheis, N.; Kny, E.

    1995-01-01

    The divertor of a near-term fusion device has to withstand high heat fluxes, heat shocks, and erosion caused by the plasma. Furthermore, it has to be maintainable through remote techniques. Above all, a good heat removal capability across the interface (low-Z armor/heat sink) plus overall integrity after many operational cycles are needed. To meet all these requirements, an active metal brazing technique is applied to bond graphite and carbon-fiber composite materials to a heat sink consisting of a Mo-41Re coolant tube through a TZM body. Plain brazed graphite and TZM tiles are tested for their fusion-relevant properties. The interfaces appear undamaged after thermal cycling when the melting point of the braze joint is not exceeded and when the graphite armor is > 4 mm thick. High heat flux tests are performed on three actively cooled divertor targets. The braze joints show no sign of failure after exposure to thermal loads ∼ 25 % higher than the design value surface heat flux of 10 MW/m 2 . (author)

  3. Experiences with drug testing at a nuclear power plant

    International Nuclear Information System (INIS)

    Ray, H.B.

    1987-01-01

    After more than 2 yr of operation of a drug testing program at the San Onofre nuclear power plant site, the Southern California Edison Co. has had a number of experiences and lessons considered valuable. The drug testing program at San Onofre, implemented in September of 1984, continues in essentially the same form today. Prior to describing the program, the paper reviews several underlying issues that believed to be simultaneously satisfied by the program: trustworthiness, fitness and safety, public trust, and privacy and search. The overall drug testing program, periodic drug monitoring program, and unannounced drug testing program are described. In addition to the obvious features of a good drug testing program, which are described in the EEI guide, it is essential to consider such issues as the stated program rationale, employee relations, and disciplinary action measures when contemplating or engaging in drug testing at nuclear power plants

  4. The first operation of the Delphos plant: Test results

    International Nuclear Information System (INIS)

    Sarno, A.; Noviello, G.; Cordisco, S.; Di Paola, L.; Guerra, M.

    1991-09-01

    The data collected during the O and M of the Delphos plant and the testing results are presented and discussed. Together with the maintenance influence on the operation and production of the plant, the various downtime causes are pointed out. An extensive activity has been carried out to investigate the actual behaviour of the photovoltaic generator and the power conditioning unit. The analysis of the experimental results allows to focus on the different causes of loss and suggest some actions to be taken in order to improve the plant efficiency and increase the energy production. (author)

  5. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

      When, in a competitive sphere, people are selected on the basis of qualifications only, their chances of acquiring positions of advantage may seem to depend entirely upon their abilities, not discriminatory bias. However, if reaction qualifications - i.e. characteristics which contribute...... to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... of merit. Specifically, it preserves symmetry between negative evaluations of antimeritocratic bases of selection and negative evaluations of qualifications rooted in comparable antimeritocratic reactions. So if employers should not select among applicants on the basis of their (the employers') racial...

  6. Half and full scale drop tests for qualification of CONSTOR registered casks as type B(U)F packages

    International Nuclear Information System (INIS)

    Koenig, S.; Diersch, R.

    2004-01-01

    The CONSTOR registered steel-sandwich cask was developed as a cost-effective design by using conventional mechanical engineering technologies and commonly available materials. The CONSTOR registered consists of a cask body with an outer and an inner shell made of steel. At the upper end, the shells are welded to a ring made of forged steel. The space between the two shells is filled with heavy concrete for gamma and neutron shielding. The liner of the casks and the forged head ring form the basis for the structural integrity, the concrete bears only a menial part of accident loads. The CONSTOR registered concept fulfils both the internationally valid IAEA criteria for transportation and the requirements for long-term intermediate storage in the US and various European countries. Since the beginning of the development of the CONSTOR registered design, two drop test series have already been performed and a third one is being planned to start in 2004

  7. Novel weapons testing: are invasive plants more chemically defended than native plants?

    Directory of Open Access Journals (Sweden)

    Eric M Lind

    2010-05-01

    Full Text Available Exotic species have been hypothesized to successfully invade new habitats by virtue of possessing novel biochemistry that repels native enemies. Despite the pivotal long-term consequences of invasion for native food-webs, to date there are no experimental studies examining directly whether exotic plants are any more or less biochemically deterrent than native plants to native herbivores.In a direct test of this hypothesis using herbivore feeding assays with chemical extracts from 19 invasive plants and 21 co-occurring native plants, we show that invasive plant biochemistry is no more deterrent (on average to a native generalist herbivore than extracts from native plants. There was no relationship between extract deterrence and length of time since introduction, suggesting that time has not mitigated putative biochemical novelty. Moreover, the least deterrent plant extracts were from the most abundant species in the field, a pattern that held for both native and exotic plants. Analysis of chemical deterrence in context with morphological defenses and growth-related traits showed that native and exotic plants had similar trade-offs among traits.Overall, our results suggest that particular invasive species may possess deterrent secondary chemistry, but it does not appear to be a general pattern resulting from evolutionary mismatches between exotic plants and native herbivores. Thus, fundamentally similar processes may promote the ecological success of both native and exotic species.

  8. Economies of using seismic experience data qualification methods at Department of Energy facilities

    International Nuclear Information System (INIS)

    Loceff, F.; Antaki, G.; Goen, L.

    1995-01-01

    This paper summarizes the implementation of the seismic qualification of existing equipment using experience data techniques. The emphasis is on the economies of this approach compared with standard qualification methods of analysis and testing or replacement with qualified equipment. Seismic qualification of existing equipment using experience data is a technical necessity and is the most economically attractive of the options. Representative costs for seismic qualification at two facilities show costs are substantially lower than the costs for qualification using conventional methods. Because of the experience to date, the authors recommend that the Department of Energy continue to sponsor the Existing Facilities Program for applying qualification using experience data techniques at DOE facilities

  9. 10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-25

    Testing plans for a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally, the design planned for the Barstow Solar Pilot Plant are presented. Testing is to include operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the panel's transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. Test hardware are described, including the pilot plant receiver, the test receiver assembly, receiver panel, flow control, electrical control and instrumentation, and structural assembly. Requirements for the Solar Thermal Test Facility for the tests are given. The safety of the system is briefly discussed, and procedures are described for assembly, installation, checkout, normal and abnormal operations, maintenance, removal and disposition. Also briefly discussed are quality assurance, contract responsibilities, and test documentation. (LEW)

  10. Identification of Radioactive Pilot-Plant test requirements

    Energy Technology Data Exchange (ETDEWEB)

    Powell, W.J.; Riebling, E.F.

    1995-05-09

    Radioactive Pilot-Plant testing needs and alternatives are evaluated for enhanced Sludge Washing and High and Low-Level Vitrification efforts. Also investigated was instrument and equipment testing needs associated with the vitrification and retrieval process. The scope of this document is to record the existing March 1994 letter report for future use. A structured Kepner-Trego{trademark} decision analysis process was used to assist analysis of the testing needs. This analysis provided various combinations of laboratory and radioactive (hot) and cold pilot testing options associated with the above need areas. Recommendations for testing requirements were made.

  11. Identification of Radioactive Pilot-Plant test requirements

    International Nuclear Information System (INIS)

    Powell, W.J.; Riebling, E.F.

    1995-01-01

    Radioactive Pilot-Plant testing needs and alternatives are evaluated for enhanced Sludge Washing and High and Low-Level Vitrification efforts. Also investigated was instrument and equipment testing needs associated with the vitrification and retrieval process. The scope of this document is to record the existing March 1994 letter report for future use. A structured Kepner-Trego trademark decision analysis process was used to assist analysis of the testing needs. This analysis provided various combinations of laboratory and radioactive (hot) and cold pilot testing options associated with the above need areas. Recommendations for testing requirements were made

  12. ESCRIME: testing bench for advanced operator workstations in future plants

    International Nuclear Information System (INIS)

    Poujol, A.; Papin, B.

    1994-01-01

    The problem of optimal task allocation between man and computer for the operation of nuclear power plants is of major concern for the design of future plants. As the increased level of automation induces the modification of the tasks actually devoted to the operator in the control room, it is very important to anticipate these consequences at the plant design stage. The improvement of man machine cooperation is expected to play a major role in minimizing the impact of human errors on plant safety. The CEA has launched a research program concerning the evolution of the plant operation in order to optimize the efficiency of the human/computer systems for a better safety. The objective of this program is to evaluate different modalities of man-machine share of tasks, in a representative context. It relies strongly upon the development of a specific testing facility, the ESCRIME work bench, which is presented in this paper. It consists of an EDF 1300MWe PWR plant simulator connected to an operator workstation. The plant simulator model presents at a significant level of details the instrumentation and control of the plant and the main connected circuits. The operator interface is based on the generalization of the use of interactive graphic displays, and is intended to be consistent to the tasks to be performed by the operator. The functional architecture of the workstation is modular, so that different cooperation mechanisms can be implemented within the same framework. It is based on a thorough analysis and structuration of plant control tasks, in normal as well as in accident situations. The software architecture design follows the distributed artificial intelligence approach. Cognitive agents cooperate in order to operate the process. The paper presents the basic principles and the functional architecture of the test bed and describes the steps and the present status of the program. (author)

  13. Pressure test behaviour of embalse nuclear power plant containment structure

    International Nuclear Information System (INIS)

    Bruschi, S.; Marinelli, C.

    1984-01-01

    It's described the structural behaviour of the containment structure during the pressure test of the Embalse plant (CANDU type, 600MW), made of prestressed concrete with an epoxi liner. Displacement, strain, temperature, and pressure measurements of the containment structure of the Embalse Nuclear Power Plant are presented. The instrumentation set up and measurement specifications are described for all variables of interest before, during and after the pressure test. The analytical models to simulate the heat transfer due to sun heating and air convenction and to predict the associated thermal strains and displacements are presented. (E.G.) [pt

  14. LTP fibre injector qualification and status

    International Nuclear Information System (INIS)

    Bogenstahl, J; Cunningham, L; Fitzsimons, E D; Hough, J; Killow, C J; Perreur-Lloyd, M; Robertson, D; Rowan, S; Ward, H

    2009-01-01

    This paper presents the current state of the LISA Technology Package (LTP) fibre injector qualification project in terms of vibration and shock tests. The fibre injector is a custom built part and therefore must undergo a full space qualification process. The mounting structure and method for sinusoidal vibration and random vibration tests as well as shock tests will be presented. Furthermore a proposal will be presented to use the fibre injector pair qualification model to build an optical prototype bench. The optical prototype bench is a full-scale model of the flight model. It will be used for development and rehearsal of all the assembly stages of the flight model and will provide an on-ground simulator for investigation as an updated engineering model.

  15. Software qualification in safety applications

    International Nuclear Information System (INIS)

    Lawrence, J.D.

    2000-01-01

    The developers of safety-critical instrumentation and control systems must qualify the design of the components used, including the software in the embedded computer systems, in order to ensure that the component can be trusted to perform its safety function under the full range of operating conditions. There are well known ways to qualify analog systems using the facts that: (1) they are built from standard modules with known properties; (2) design documents are available and described in a well understood language; (3) the performance of the component is constrained by physics; and (4) physics models exist to predict the performance. These properties are not generally available for qualifying software, and one must fall back on extensive testing and qualification of the design process. Neither of these is completely satisfactory. The research reported here is exploring an alternative approach that is intended to permit qualification for an important subset of instrumentation software. The research goal is to determine if a combination of static analysis and limited testing can be used to qualify a class of simple, but practical, computer-based instrumentation components for safety application. These components are of roughly the complexity of a motion detector alarm controller. This goal is accomplished by identifying design constraints that enable meaningful analysis and testing. Once such design constraints are identified, digital systems can be designed to allow for analysis and testing, or existing systems may be tested for conformance to the design constraints as a first step in a qualification process. This will considerably reduce the cost and monetary risk involved in qualifying commercial components for safety-critical service

  16. Field vibration test of principal equipment of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Shiraki, Kazuhiro; Fujita, Katsuhisa; Kajimura, Motohiko; Ikegami, Yasuhiko; Hanzawa, Katsumi; Sakai, Yoshiyuki; Kokubo, Eiji; Igarashi, Shigeru

    1984-09-01

    Japan is one of the most earthquake-stricken countries in the world, and demands for aseismic design have become severer recently. In a nuclear power plant in particular, consisting of a reactor vessel and other facilities dealing with a radioactive substance in some form or other, it is essential from the standpoint of safety to eliminate any possibility of radioactive hazards for the local public, and the employees at the plant as well, if these facilities are struck by an earthquake. This paper is related to the reactor vessel, reactor primary cooling equipment and piping system and important general piping as examples of important facilities of a nuclear power plant, and discusses vibration tests of an actual plant in the field from the standpoint of enhancing the aseismic safety of the Mitsubishi PWR nuclear power plant. Especially concerning vibration test technology, the effects in the evaluation of aseismic safety and its limits are studied to prove how it contributes to the enhancement of the reliability of aseismic design of nuclear power plants.

  17. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2000-01-01

    In 1999 the Nuclear Regulatory Authority of the Slovak Republic (UJD) focused on the overall training system and on developing programmes for individual categories for NPP V-1 Bohunice, NPP V-2 Bohunice, NPP Mochovce and SE-VYZ. The fundamental theoretical and periodical training for both Bohunice and Mochovce NPPs personnel, simulator training for NPP Bohunice, and periodical simulator training for Bohunice personnel is carried out by the VUJE Training center in Trnava, whereas the simulator training and periodical training for NPP Mochovce is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues, a certificate on special professional skills of selected staff of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: (a)Shift manager for scientific start up with the right of manipulation; (b) Shift supervisor; (c) Unit supervisor; (d) Primary circuit operator; (e) Secondary circuit operator; (f) Reactor physicist; (g) Shift manager for scientific start up without the right of manipulation. Examination of selected personnel is described. Last year the examining committee held twelve session for oral theoretical examination. The number of licenses issued in 1999 and the total number of valid licenses is given.Conclusions from inspections carried out by UJD and inspections and tests carried out by the NPP operators in 1999, as well as results from operation and start up of nuclear units confirm that the standard of professional skills of the staff at nuclear installations a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for the staff for 1999. These training, composed of specialized qualification study, functional study, as well as study aimed at maintaining qualification. Training courses organized

  18. Training and qualification of inspectors

    International Nuclear Information System (INIS)

    Aro, I.; Anderson, R.; Ericsson, P.O.; Lee, I.

    1993-01-01

    A total of four workshop breakout sessions were conducted on this subject: one double session and three single sessions. The following discussion describes common points and difference among the countries in the areas of inspector training and qualifications. In most countries there are resident or non-resident site-specific inspectors who have general plant supervision duties. In addition, there are specialized inspectors who visit NPP when requested or according to the scheduled inspection program. Most countries try to recruit experienced personnel. Many countries prefer to have candidates who have extensive plant experience. Some countries do not recruit inspectors from utilities because of potential conflict of interest or credibility reasons. In many countries, the typical training time to become an independent inspector is one year. In some countries an inspector is formally certified after their training period and completion of an examination

  19. Multifrequency tests in the EBR-II reactor plant

    International Nuclear Information System (INIS)

    Feldman, E.E.; Mohr, D.; Gross, K.C.

    1989-01-01

    A series of eight multifrequency tests was conducted on the Experimental Breeder Reactor II. In half of the tests a control rod was oscillated and in the other half the controller input voltage to the intermediate-loop-sodium pump was perturbed. In each test the input disturbance consisted of several superimposed single-frequency sinusoidal harmonics of the same fundamental. The tests are described along with the theoretical and practical aspects of their development and design. Samples of measured frequency responses are also provided for both the reactor and the power plant. 22 refs., 5 figs., 2 tabs

  20. Design type testing for digital instrumentation and control systems

    International Nuclear Information System (INIS)

    Bastl, W.; Mohns, G.

    1997-01-01

    The design type qualification of digital safety instrumentation and control is outlined. Experience shows that the concepts discussed, derived from codes, guidelines and standards, achieve useful results. It has likewise become clear that the systematics of design type qualification of the hardware components is also applicable to the software components. Design type qualification of the software, a premiere, could be performed unexpectedly smoothly. The hardware design type qualification proved that the hardware as a substrate of functionality and reliability is an issue that demands full attention, as compared to conventional systems. Another insight is that design qualification of digital instrumentation and control systems must include plant-independent systems tests. Digital instrumentation and control systems simply work very differently from conventional control systems, so that this testing modality is inevitable. (Orig./CB) [de

  1. A nuclear power plant certification test plan and checklist

    International Nuclear Information System (INIS)

    Halverson, S.M.

    1989-01-01

    Regulations within the nuclear industry are requiring that all reference plant simulators be certified prior to or during 1991. A certification test plan is essential to ensure that this goal is met. A description of each step in the certification process is provided in this paper, along with a checklist to help ensure completion of each item

  2. Pyrolysis of rubber gloves in integral pyrolysis test plant

    International Nuclear Information System (INIS)

    Norasalwa Zakaria; Mohd Noor Muhd Yunus; Mohd Annuar Assadat Husain; Farid Nasir Ani

    2010-01-01

    Previously, pyrolysis of rubber gloves in laboratory study was described. In order to visualize the practical application of rubber gloves pyrolysis in terms of treating rubber gloves in medical waste, a new test plant was designed and constructed. The semi-continuous test plant was designed to accommodate rubber gloves that were not cut or shredded. The test plant has a capacity of 2kg/ hr and employed auxiliary fuel instead of the conventional electrical power for heating. The concept was based on moving bed reactor, but additional feature of sand jacket feature was also introduced in the design. Pyrolysis of the gloves was conducted at three temperatures, namely 350 degree Celsius, 400 degree Celsius and 450 degree Celsius. Oxygen presents inside of the reactor due to the combined effect of imperfect sealing and suction effect. This study addresses the performance of this test plant covering the time temperature profile, gas evolution profile and product yield. Comparison between the yield of the liquid, gas and char pyrolyzate was made against the laboratory study. It was found that the oil yield was less than the one obtained from bench scale study. Water formation was more pronounced. The presence of the oxygen also altered the tail gas composition but eliminate the sticky nature of solid residue, making it easier to handle. The chemical composition of the oil was determined and the main compounds in the oil were esters and phtalic acid. (author)

  3. Qualification, training, licensing/authorization and retraining of operating personnel in nuclear power plants. Some requirements and practices commonly shared in the European Community Member States

    International Nuclear Information System (INIS)

    Pele, J.P.

    1987-01-01

    At the end of the fifties a treaty was signed instituting between six countries of the European Community for Atomic Energy, or in brief, Euratom. This treaty, in addition to the Common Market Treaty and the Coal and Steel one, constitutes the legal frame of the European Community which, at present, comprises 12 Member States. A commission, the so-called Commission of the European Communities (or in brief CEC) has to implement the provisions laid down in the treaties. Qualification, training, licensing and re-training of operating personnel have been the subjects of an in-depth exchange of views and information in the frame of the work conducted by the Commission. The evaluation of the regulations and practices in countries of the EC and some other countries having a large nuclear energy program, has led to the identification of some generally valid concepts. This synthesis, made with the assistance of a consultant, is now published under the form of an EUR report (EUR 10981). The main topics addressed within this report are the following: shift staffing and staffing of the control room, personnel selection, qualifications necessary for recruitment, training and retraining, and licensing/authorization

  4. The need to qualify Non Destructive Tests (NDT) has been recognized for many years in the European countries engaged in nuclear power generation

    International Nuclear Information System (INIS)

    Walczak, M.; Wojas, M.

    2008-01-01

    The European Network for Inspection Qualification, ENIQ, which groups the major part of the nuclear power plant operators in the European Union and in the Applicant Countries, has developed the European methodology for Qualification of Non Destructive Tests. As qualification of NDT is nowadays a standard method in the nuclear industry and in other industries. CEN (European Committee for Standardization) Technical Committee 138 '' Non Destructive Testing '' has established a Working Group, which is responsible for developing a Standard document detailing the CEN Methodology for the qualification of Non Destructive Tests applicable to all industries carrying out Non-Destructive Tests. This Standard document sets out basic principles and provides recommendations and general guidelines for carrying out qualification of NDT. It describes a methodology for qualification of Non-Destructive Tests, applicable to all NDT methods and considers qualification of equipment, procedure and personnel training. This paper presents a short background of the European Methodology for Qualification of Non-Destructive Tests and the Standard document CEN/TR 14748 '' Non-destructive testing - Methodology for qualification of non-destructive tests ''. (author)

  5. AGC-3 Experiment Irradiation Monitoring Data Qualification Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hull, Laurence C. [Idaho National Lab. (INL), Idaho Falls, ID (United States). VHTR Technology Development Office

    2014-08-01

    The Graphite Technology Development Program will run a series of six experiments to quantify the effects of irradiation on nuclear-grade graphite. The third experiment, Advanced Graphite Creep 3 (AGC-3), began with Advanced Test Reactor (ATR) Cycle 152B on November 27, 2012, and ended with ATR Cycle 155B on April 23, 2014. This report documents qualification of AGC-3 experiment irradiation monitoring data for use by the Very High Temperature Reactor (VHTR) Technology Development Office (TDO) Program for research and development activities required to design and license the first VHTR nuclear plant. Qualified data meet the requirements for data collection and use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements. Trend data may not meet the requirements, but may still provide some useable information. The report documents qualification of AGC-3 experiment irradiation monitoring data following MCP-2691. This report also documents whether AGC-3 experiment irradiation monitoring data meet the requirements for data collection as specified in technical and functional requirements documents and quality assurance (QA) plans. Data handling is described showing how data are passed from the data collection experiment to the Nuclear Data Management and Analysis System (NDMAS) team. The data structure is described, including data batches, components, attributes, and response variables. The description of the approach to data qualification includes the steps taken to qualify the data and the specific tests used to verify that the data meet requirements. Finally, the current status of the data received by NDMAS from the AGC-3 experiment is presented with summarized information on test results and resolutions. This report addresses all of the irradiation monitoring data collected during the AGC-3 experiment.

  6. A Cryogenic Test Set-Up for the Qualification of Pre-Series Test Cells for the LHC Cryogenic Distribution Line

    CERN Document Server

    Livran, J; Parente, C; Riddone, G; Rybkowski, D; Veillet, N

    2000-01-01

    Three pre-series Test Cells of the LHC Cryogenic Distribution Line (QRL) [1], manufactured by three European industrial companies, will be tested in the year 2000 to qualify the design chosen and verify the thermal and mechanical performances. A dedicated test stand (170 m x 13 m) has been built for extensive testing and performance assessment of the pre-series units in parallel. They will be fed with saturated liquid helium at 4.2 K supplied by a mobile helium dewar. In addition, LN2 cooled helium will be used for cool-down and thermal shielding. For each of the three pre-series units, a set of end boxes has been designed and manufactured at CERN. This paper presents the layout of the cryogenic system for the pre-series units, the calorimetric methods as well as the results of the thermal calculation of the end box test.

  7. Creep property testing of energy power plant component material

    International Nuclear Information System (INIS)

    Nitiswati, Sri; Histori; Triyadi, Ari; Haryanto, Mudi

    1999-01-01

    Creep testing of SA213 T12 boiler piping material from fossil plant, Suralaya has been done. The aim of the testing is to know the creep behaviour of SA213 T12 boiler piping material which has been used more than 10 yeas, what is the material still followed ideal creep curve (there are primary stage, secondary stage, and tertiary stage). This possibility could happened because the material which has been used more than 10 years usually will be through ageing process because corrosion. The testing was conducted in 520 0C, with variety load between 4% until 50% maximum allowable load based on strength of the material in 520 0C

  8. European methodology for qualification of NDT as developed by ENIQ

    International Nuclear Information System (INIS)

    Champigny, F.; Sandberg, U.; Engl, G.; Crutzen, S.; Lemaitre, P.

    1997-01-01

    The European Network for Inspection Qualification (ENIQ) groups the major part of the nuclear power plant operators in the European Union (and Switzerland). The main objective of ENIQ is to co-ordinate and manage at European level expertise and resources for the qualification of NDE inspection systems, primarily for nuclear components. In the framework of ENIQ the European methodology for qualification of NDT has been developed. In this paper the main principles of the European methodology are given besides the main activities and organisation of ENIQ. (orig.)

  9. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Sarkimo, M. [VTT Technical Research Centre of Finland, Espoo (Finland); Pitkaenen, J.

    2013-12-15

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  10. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    International Nuclear Information System (INIS)

    Sarkimo, M.; Pitkaenen, J.

    2013-12-01

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  11. Status report on developments and cooperation on risk-informed inservice-inspection and non-destructive testing (NDT) qualification in OECD-NEA member countries - CSNI integrity and ageing working group

    International Nuclear Information System (INIS)

    Skanberg, Lars

    2005-01-01

    presented at the Workshop have been published in the proceedings referenced NEA/CSNI/R(2004)9. The two reports along with the NRWG-report EUR 21320 are the main source of information for this Status Report on Developments and Cooperation on Risk-Informed In-Service-Inspection and Non-Destructive Testing (NDT) Qualification in OECD-NEA member countries. The report is organized in the following way: introduction to early ISI strategies and Augmented ISI and NDT Qualification; Risk-Informed In-Service Inspection (RI-ISI): Development of RI-ISI strategies, RI-ISI Regulatory guidance, Important aspects of RI-ISI, Overview of RI-ISI methods, Comparison of methods, Overview of RI-ISI applications and pilot studies, RI-ISI experience so far, Further evaluations and developments of RI-ISI methodologies; Non-Destructive Testing (NDT) Qualification: Development of NDT qualification strategies, NDT-qualification requirements and applications, NDT-qualification experience. Conclusions and recommendations are then given

  12. Commercial Parts Technology Qualification Processes

    Science.gov (United States)

    Cooper, Mark S.

    2013-01-01

    Many high-reliability systems, including space systems, use selected commercial parts (including Plastic Encapsulated Microelectronics or PEMs) for unique functionality, small size, low weight, high mechanical shock resistance, and other factors. Predominantly this usage is subjected to certain 100% tests (typically called screens) and certain destructive tests usually (but not always) performed on the flight lot (typically called qualification tests). Frequently used approaches include those documented in EEE-INST-002 and JPL DocID62212 (which are sometimes modified by the particular aerospace space systems manufacturer). In this study, approaches from these documents and several space systems manufacturers are compared to approaches from a launch systems manufacturer (SpaceX), an implantable medical electronics manufacturer (Medtronics), and a high-reliability transport system process (automotive systems). In the conclusions section, these processes are outlined for all of these cases and presented in tabular form. Then some simple comparisons are made. In this introduction section, the PEM technology qualification process is described, as documented in EEE-INST-002 (written by the Goddard Space Flight Center, GSFC), as well as the somewhat modified approach employed at the Jet Propulsion Laboratory (JPL). Approaches used at several major NASA contractors are also described

  13. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 EOS Instrument, (S/N 202) Qualification Level Vibration Tests of August/September 1998, (S/O 565632, OC-417) Plus Addendum A

    Science.gov (United States)

    Heffer, R.

    1998-01-01

    The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.

  14. Full scale dynamic testing of Paks nuclear power plant structures

    International Nuclear Information System (INIS)

    Da Rin, E.M.

    1995-01-01

    This report refers to the full-scale dynamic structural testing activities that have been performed in December 1994 at the Paks (H) Nuclear Power Plant, within the framework of: the IAEA Coordinated research Programme 'Benchmark Study for the Seismic Analysis and Testing of WWER-type Nuclear Power Plants, and the nuclear research activities of ENEL-WR/YDN, the Italian National Electricity Board in Rome. The specific objective of the conducted investigation was to obtain valid data on the dynamic behaviour of the plant's major constructions, under normal operating conditions, for enabling an assessment of their actual seismic safety to be made. As described in more detail hereafter, the Paks NPP site has been subjected to low level earthquake like ground shaking, through appropriately devised underground explosions, and the dynamic response of the plant's 1 st reactor unit important structures was appropriately measured and digitally recorded. In-situ free field response was measured concurrently and, moreover, site-specific geophysical and seismological data were simultaneously acquired too. The above-said experimental data is to provide basic information on the geophysical and seismological characteristics of the Paks NPP site, together with useful reference information on the true dynamic characteristics of its main structures and give some indications on the actual dynamic soil-structure interaction effects for the case of low level excitation

  15. T25 Qualification of old containers

    International Nuclear Information System (INIS)

    Hoerning, T.; Kasparek, E.M.; Voelzke, H.

    2013-01-01

    Radioactive waste for final disposal in the repository Konrad has to be packaged in licensed containers. The qualification of containers is performed according the respective standards and BfS requirements. The latter ones differ for different container types with respect to accident resistance based on the release behavior of the waste. Usually qualification of container types is performed before series production. The qualification of already produced containers (''old containers'') is significantly more complicated. The differences of quality assurance and materials properties of the older containers have to be evaluated. A main tool for this evaluation is the numerical re-calculation of accident scenarios for estimation of the safety margins. The validation of appropriate finite element models is available. Based on these date it might be possible to abandon additional drop tests with the existing old containers to prove the structural integrity.

  16. ENIQ: European Network for Inspection Qualification: Status report

    International Nuclear Information System (INIS)

    Champigny, F.; Sandberg, U.; Crutzen, S.; Lemaitre, P.

    1998-01-01

    The European Network for Inspection Qualification (ENIQ) groups the major part of the nuclear power plant operators in the European Union (and Switzerland). The main objective of ENIQ is to co-ordinate and manage at European level expertise and resources for the qualification of NDE inspection systems, primarily for nuclear components. In this paper the main activities, organisation and actual status of ENIQ are discussed. (author)

  17. R/D and implement of temper bead welding as newly developed maintenance technique in nuclear power plant

    International Nuclear Information System (INIS)

    Hirano, Shinro; Sera, Takehiko; Chigusa, Naoki; Okimura, Koji; Nishimoto, Kazutoshi

    2011-01-01

    Japanese government has recently addressed a policy to increase capacity factor of existing nuclear PPs to achieve the goal to decrease the emission of CO 2 . Numerous preventive measures have taken in nuclear power plants to minimize the risk of unexpected long shutdown. Newly developed mitigation measures or repair methods need to be qualified to satisfy regulatory standards, before it is implemented to nuclear power plants. The qualification process needs to comply regulatory standards though it may consume time to go through each of the required steps. This paper describes such cases namely ambient temper-bead welding and clarifies the issues that need to be resolved regarding qualification process. The qualification process for new methods that has not been prescribed in regulatory standards temporarily completed by go through confirm testing by JAPEIC, RNP and issuance of no action letter in rush. Currently, the qualification process can only be applied on limited area so generalized qualification process needs to be established. (author)

  18. Power plant cable condition monitoring and testing at Georgia Power

    International Nuclear Information System (INIS)

    Champion, T.C.

    1988-01-01

    Georgia Power's Research Center has been heavily involved in the evaluation of electrical insulating materials and cables since its inception more than 17 years ago. For the past ten years that expertise has been applied to cables used in generation plants. This paper discusses the results of two test programs. The first is a quality control inspection on 169 samples of new power generation cables. The second is a material degradation evaluation on four short cable samples removed from a coal fired plant during an equipment upgrade. The new material evaluation was performed to identify the cause of a high failure rate upon initial hi-pot testing of newly installed cables. The material degradation evaluation was performed to evaluate the need for replacement of existing cables during an equipment upgrade. Results of the evaluations have led to development of a detailed proposal for a program to evaluate cable degradation and remaining life for cables used in power generation facilities

  19. High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test

    Energy Technology Data Exchange (ETDEWEB)

    Richard D. Boardman; B. H. O& #39; Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

    2004-02-01

    About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing

  20. NRC's experiment with plant personnel training: the acid test of self-regulation

    International Nuclear Information System (INIS)

    Reynolds, N.S.

    1985-01-01

    In February 1985, the US Nuclear Regulatory Commission (NRC) initiated an experiment with a form of nuclear utility self-regulation. The commissioners unanimously endorsed the nuclear utility industry's commitment to achieve self-improvement voluntarily in the area of training and qualification of nuclear plant personnel, and accepted that commitment as a basis for deferring rulemaking. In taking this action, the Commission may have signaled a marked departure from the post-Three Mile Island (TMI) era of prescriptive (and occasionally pedantic) regulatory practices to a new era of increased cooperation with nuclear utilities

  1. Thermal performance test for steam turbine of nuclear power plants

    International Nuclear Information System (INIS)

    Bu Yubing; Xu Zongfu; Wang Shiyong

    2014-01-01

    Through study of steam turbine thermal performance test of CPR1000 nuclear power plant, we solve the enthalpy calculation problems of the steam turbine in wet steam zone using heat balance method which can help to figure out the real overall heat balance diagram for the first time, and we develop a useful software for thermal heat balance calculation. Ling'ao phase II as an example, this paper includes test instrument layout, system isolation, risk control, data acquisition, wetness measurement, heat balance calculation, etc. (authors)

  2. Report on the Regulators Experience of NDT Qualification for In-service Inspection of Nuclear Components

    International Nuclear Information System (INIS)

    2003-08-01

    In November 1992, the Nuclear Regulators Working Group (NRWG) decided to set up a task force on qualification of non-destructive testing (NDT) systems for pre and in-service inspection of light water reactors. The first task was to agree on the philosophy and principles governing the qualification of techniques, equipment, software, procedures, and personnel for NDT to be used for the inspection of structural components that are important to safety in nuclear power plants; and to establish a common view on essential aspects of NDT qualifications. The first task, which also included a comparison of the common views of the European regulators with the qualification approach outlined in Appendix VIII to Section XI of the ASME Code, was completed in 1996. The result was published in the report ''Common position of European regulators on qualification of NDT systems for pre- and in-service inspection of light water reactor components''2. In parallel, the European nuclear power industries had set up a working group, the European Network for Inspection Qualification (ENIQ), to discuss and agree on how to perform inspection qualifications. In 1995, ENIQ finalized its first version of ''European methodology for qualification of non-destructive tests''3. A second version 4 was then published in 1997. This second version is in relatively close agreement with the principles given in the regulators common position document. With these two basic documents, a platform was established for the further development of qualification strategies in the European countries. The second task of the NRWG Task Force was to follow and evaluate the first ENIQ pilot study from a regulatory point of view. The objective of this pilot study was to explore ways of how to apply the European qualification methodology and to test its feasibility. The pilot study commenced late 1996 and was planned to be finalized a year later. Depending on unforeseen difficulties, the pilot study has been delayed

  3. Safety demonstration test on solvent fire in fuel reprocessing plant

    International Nuclear Information System (INIS)

    Nishio, Gunji; Hashimoto, Kazuichiro

    1989-03-01

    This report summarizes a fundamental of results obtained in the Reprocessing Plant Safety Demonstration Test Program which was performed under the contract between the Science and Technology Agency of Japan and the Japan Atomic Energy Research Institute. In this test program, a solvent fire was hypothesized, and such data were obtained as fire behavior, smoke behavior and integrity of exhaust filters in the ventilation system. Through the test results, it was confirmed that under the fire condition in hypothetical accident, the integrity of the cell and the cell ventilation system were maintained, and the safety function of the exhaust filters was maintained against the smoke loading. Analytical results by EVENT code agreed well with the present test data on the thermofluid flow in a cell ventilation system. (author)

  4. Test phase plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1993-03-01

    The US Department of Energy (DOE) has prepared this Test Phase Plan for the Waste Isolation Pilot Plant to satisfy the requirements of Public Law 102-579, the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA). The Act provides seven months after its enactment for the DOE to submit this Plan to the Environmental Protection Agency (EPA) for review. A potential geologic repository for transuranic wastes, including transuranic mixed wastes, generated in national-defense activities, the WIPP is being constructed in southeastern New Mexico. Because these wastes remain radioactive and chemically hazardous for a very long time, the WIPP must provide safe disposal for thousands of years. The DOE is developing the facility in phases. Surface facilities for receiving waste have been built and considerable underground excavations (2150 feet below the surface) that are appropriate for in-situ testing, have been completed. Additional excavations will be completed when they are required for waste disposal. The next step is to conduct a test phase. The purpose of the test phase is to develop pertinent information and assess whether the disposal of transuranic waste and transuranic mixed waste in the planned WIPP repository can be conducted in compliance with the environmental standards for disposal and with the Solid Waste Disposal Act (SWDA) (as amended by RCRA, 42 USC. 6901 et. seq.). The test phase includes laboratory experiments and underground tests using contact-handled transuranic waste. Waste-related tests at WIPP will be limited to contact-handled transuranic and simulated wastes since the LWA prohibits the transport to or emplacement of remote-handled transuranic waste at WIPP during the test phase

  5. Information on the Advanced Plant Experiment (APEX) Test Facility

    International Nuclear Information System (INIS)

    Smith, Curtis Lee

    2015-01-01

    The purpose of this report provides information related to the design of the Oregon State University Advanced Plant Experiment (APEX) test facility. Information provided in this report have been pulled from the following information sources: Reference 1: R. Nourgaliev and et.al, 'Summary Report on NGSAC (Next-Generation Safety Analysis Code) Development and Testing,' Idaho National Laboratory, 2011. Note that this is report has not been released as an external report. Reference 2: O. Stevens, Characterization of the Advanced Plant Experiment (APEX) Passive Residual Heat Removal System Heat Exchanger, Master Thesis, June 1996. Reference 3: J. Reyes, Jr., Q. Wu, and J. King, Jr., Scaling Assessment for the Design of the OSU APEX-1000 Test Facility, OSU-APEX-03001 (Rev. 0), May 2003. Reference 4: J. Reyes et al, Final Report of the NRC AP600 Research Conducted at Oregon State University, NUREG/CR-6641, July 1999. Reference 5: K. Welter et al, APEX-1000 Confirmatory Testing to Support AP1000 Design Certification (non-proprietary), NUREG-1826, August 2005.

  6. Procedure for qualification of electric equipment installed in containments for pressurized water reactors subject to accident conditions

    International Nuclear Information System (INIS)

    1991-11-01

    This generic norm is usable for electrical equipment installed in containment building of PWR subject to accidental conditions. She defines the qualification methods and the general rules usable for the test specifications of qualification for these materials

  7. Guidelines for inservice testing at nuclear power plants

    International Nuclear Information System (INIS)

    Campbell, P.

    1995-04-01

    The staff of the U.S. Nuclear Regulatory Commission (NRC) gives licensees guidelines and recommendations for developing and implementing programs for the inservice testing of pumps and valves at commercial nuclear power plants. The staff discusses the regulations; the components to be included in an inservice testing program; and the preparation and content of cold shutdown justifications, refueling outage justifications, and requests for relief from the American Society of Mechanical Engineers Code requirements. The staff also gives specific guidance on relief acceptable to the NRC and advises licensees in the use of this information at their facilities. The staff discusses the revised standard technical specifications for the inservice testing program requirements and gives guidance on the process a licensee may follow upon finding an instance of noncompliance with the Code

  8. AGR-2 Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Michael L. Abbott

    2010-09-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  9. AGR-2 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Michael L.

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  10. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  11. Virtual design and qualification of IC backend structures

    NARCIS (Netherlands)

    Silfhout, van R.B.R.; Sluis, van der O.; Driel, van W.D.; Janssen, J.H.J.; Zhang, G.Q.

    2006-01-01

    For Integrated Circuit (IC) wafer backend development, process developers have to design robust backend structures that guarantee both functionality and reliability during waferfab processes, packaging, qualification tests and lifetime. Figure 1 shows a simplified diagram for the design (and

  12. Secretory structure and histochemistry test of some Zingiberaceae plants

    Science.gov (United States)

    Indriyani, Serafinah

    2017-11-01

    A secretory structure is a structure that produces a plant's metabolite substances. Secretory structures are grouped into an internal and external. Zingiberaceae plants are known as traditional medicine plants and as spice plants due to secretory structures in their tissues. The objective of the research were to describe the secretory structure of Zingiberaceae plants and to discover the qualitatively primary metabolite substances in plant's tissues via histochemistry test. The research was conducted by observation descriptive design, quantitative data including the density of secretory cells per mm². The quantitative data were analyzed by ANOVA and continued by Duncan at α = 5 %. The results showed that the secretory structures in leaves, rhizome, and the root of 14 species of Zingiberaceae plants are found in the mesophyll of leaves and cortex, and also pith in rhizome and roots. The type of secretory structure is internal. Within the root of Zingiber cassumunar Roxb.(bengle), Curcuma domestica Val. (kunyit), Curcuma zedoaria (Berg.) Roscoe (kunyit putih), Zingiber zerumbet (L.) J.E. Smith (lempuyang), Alpiniapurpurata K. Schum (lengkuas merah), and Curcuma aeruginosa Val. (temu ireng) were found amylum grains, while in Kaemferia galanga L. (kencur), Boesen bergiapandurata L. (temu kunci), and Curcuma xanthorrhiza Roxb. (temulawak) there were no amylum grains in the root as well as in the leaves. The roots of bengle had the greatest density of amylum grain, it had 248.1 ± 9.8 secretory cells of amylum grains per mm². Lipids (oil droplets) were found in the root of bengle, Zingiber officinale Roxb. Var. emprit (jahe emprit), Zingiber officinale Roxb. Var. Gajah (jahe gajah), Zingiber officinale Roxb. Var. Rubrum (jahe merah), Keampferia angustifolia L. (kunci pepet), kunyit, kunyit putih, lempuyang, lengkua smerah, Curcuma aeruginosa Val. (temu ireng), and Curcuma mangga Val. and van Zijp (temu mangga); the root of lempuyang had the greatest density of oil

  13. On tungsten technologies and qualification for DEMO

    International Nuclear Information System (INIS)

    Laan, J. van der; Hegeman, H.; Wouters, O.; Luzginova, N.; Jonker, B.; Van der Marck, S.; Opschoor, J.; Wang, J.; Dowling, G.; Stuivenga, M.; Carton, E.

    2009-01-01

    Tungsten alloys are considered prime candidates for the in-vessel components directly facing the plasma. For example, in the HEMJ helium cooled divertor design tiles may be operated at temperatures up to 1700 deg. C, supported by a structure partially consisting of tungsten at temperatures from 600 to 1000 deg. C, and connected to a HT steel structure. The tungsten armoured primary wall is operated at 500-900 deg. C. Irradiation doses will be few tens dpa at minimum, but FPR requirements for plants availability will stretch these targets. Recently injection moulding technology was developed for pure tungsten and representative parts were manufactured for ITER monobloc divertors and DEMO HEMJ thimbles. The major advantages for this technology are the efficient use of material feedstock/resources and the intrinsic possibility to produce near-finished product, avoiding machining processes that are costly and may introduce surface defects deteriorating the component in service performance. It is well suited for mass-manufacturing of components as well known in e.g. lighting industries. To further qualify this material technology various specimen types were produced with processing parameters identical to the components, and tested successfully, showing the high potential for implementation in (fusion) devices. Furthermore, the engineering approach can clearly be tailored away from conventional design and manufacturing technologies based on bulk materials. The technology is suitable for shaping of new W-alloys and W-ODS variants as well. Basically this technology allows a particular qualification trajectory. There is no need to produce large batches of material during the material development and optimization stage. For the verification of irradiation behaviour in the specific neutron spectra, there is a further attractive feature to use e.g. isotope tailored powders to adjust to available irradiation facilities like MTR's. In addition the ingrowth of transmutation

  14. Test results for cables used in nuclear power plants by a new environmental testing method

    Energy Technology Data Exchange (ETDEWEB)

    Handa, Katsue; Fujimura, Shun-ichi; Hayashi, Toshiyasu; Takano, Keiji; Oya, Shingo

    1982-12-01

    In the nuclear power plants using PWRs or BWRs in Japan, environmental tests are provided, in which simulated LOCA conditions are considered so as to conform with Japanese conditions, and many cables which passed these tests are presently employed. Lately, the new environmental testing, in which a credible accident called MSLB (main steam line breakage) is taken into account, is investigated in PWR nuclear power plants, besides LOCA. This paper reports on the results of evaluating some PWR cables for this new environmental testing conditions. The several cables tested were selected out of PH cables (fire-retardant, ethylene propylene rubber insulated, chlorosulfonated polyethylene sheathed cables) as the cables for safety protecting circuits and to be used in containment vessels where the cables are to be exposed to severe environmental test conditions of 2 x 10/sup 8/ Rad ..gamma..-irradiation and simulated LOCA. All these cables have been accepted after the vertical tray burning test provided in the IEEE Standard 383. The new testing was carried out by sequentially applying thermal deterioration, ..gamma..-irradiation, and the exposure to steam (twice 300 s exposures to 190 deg C superheated steam). After completing each step, tensile strength, elongation, insulation resistance and breakdown voltage were measured, respectively. Every cable tested showed satisfactory breakdown voltage after the exposure to steam, thus it was decided to be acceptable. In future, it is required to investigate the influence of the rate of temperature rise on the cable to be tested in MSLB simulation.

  15. Test results for cables used in nuclear power plants by a new environmental testing method

    International Nuclear Information System (INIS)

    Handa, Katsue; Fujimura, Shun-ichi; Hayashi, Toshiyasu; Takano, Keiji; Oya, Shingo

    1982-01-01

    In the nuclear power plants using PWRs or BWRs in Japan, environmental tests are provided, in which simulated LOCA conditions are considered so as to conform with Japanese conditions, and many cables which passed these tests are presently employed. Lately, the new environmental testing, in which a credible accident called MSLB (main steam line breakage) is taken into account, is investigated in PWR nuclear power plants, besides LOCA. This paper reports on the results of evaluating some PWR cables for this new environmental testing conditions. The several cables tested were selected out of PH cables (fire-retardant, ethylene propylene rubber insulated, chlorosulfonated polyethylene sheathed cables) as the cables for safety protecting circuits and to be used in containment vessels where the cables are to be exposed to severe environmental test conditions of 2 x 10 8 Rad γ-irradiation and simulated LOCA. All these cables have been accepted after the vertical tray burning test provided in the IEEE Standard 383. The new testing was carried out by sequentially applying thermal deterioration, γ-irradiation, and the exposure to steam (twice 300 s exposures to 190 deg C superheated steam). After completing each step, tensile strength, elongation, insulation resistance and breakdown voltage were measured, respectively. Every cable tested showed satisfactory breakdown voltage after the exposure to steam, thus it was decided to be acceptable. In future, it is required to investigate the influence of the rate of temperature rise on the cable to be tested in MSLB simulation. (Wakatsuki, Y.)

  16. Preliminary Assessment of the Hanford Tank Waste Feed Acceptance and Product Qualification Programs

    Energy Technology Data Exchange (ETDEWEB)

    Herman, C. C.; Adamson, Duane J.; Herman, D. T.; Peeler, David K.; Poirier, Micheal R.; Reboul, S. H.; Stone, M. E.; Peterson, Reid A.; Chun, Jaehun; Fort, James A.; Vienna, John D.; Wells, Beric E.

    2013-04-01

    The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL) have been chartered to implement a science and technology program addressing Hanford Tank waste feed acceptance and product qualification. As a first step, the laboratories examined the technical risks and uncertainties associated with the planned waste feed acceptance and qualification testing for Hanford tank wastes. Science and technology gaps were identified for work associated with 1) feed criteria development with emphasis on identifying the feed properties and the process requirements, 2) the Tank Waste Treatment and Immobilization Plant (WTP) process qualification program, and 3) the WTP HLW glass product qualification program. Opportunities for streamlining the accetpance and qualification programs were also considered in the gap assessment. Technical approaches to address the science and technology gaps and/or implement the opportunities were identified. These approaches will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Pursuing the identified approaches will have immediate and long-term benefits to DOE in reducing risks and uncertainties associated with tank waste removal and preparation, transfers from the tank farm to the WTP, processing within the WTP Pretreatment Facility, and in producing qualified HLW glass products. Additionally, implementation of the identified opportunities provides the potential for long-term cost savings given the anticipated

  17. Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    Larson, D.E.; Allen, C.R.; Kruger, O.L.; Weber, E.T.

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed to immobilize pretreated Hanford high-level waste and transuranic waste in borosilicate glass contained in stainless steel canisters. Testing is being conducted in the HWVP Technology Development Project to ensure that adapted technologies are applicable to the candidate Hanford wastes and to generate information for waste form qualification. Empirical modeling is being conducted to define a glass composition range consistent with process and waste form qualification requirements. Laboratory studies are conducted to determine process stream properties, characterize the redox chemistry of the melter feed as a basis for controlling melt foaming and evaluate zeolite sorption materials for process waste treatment. Pilot-scale tests have been performed with simulated melter feed to access filtration for solids removal from process wastes, evaluate vitrification process performance and assess offgas equipment performance. Process equipment construction materials are being selected based on literature review, corrosion testing, and performance in pilot-scale testing. 3 figs., 6 tabs

  18. Hanford Waste Vitrification Plant Quality Assurance Program description for high-level waste form development and qualification. Revision 3, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The Hanford Waste Vitrification Plant Project has been established to convert the high-level radioactive waste associated with nuclear defense production at the Hanford Site into a waste form suitable for disposal in a deep geologic repository. The Hanford Waste Vitrification Plant will mix processed radioactive waste with borosilicate material, then heat the mixture to its melting point (vitrification) to forin a glass-like substance that traps the radionuclides in the glass matrix upon cooling. The Hanford Waste Vitrification Plant Quality Assurance Program has been established to support the mission of the Hanford Waste Vitrification Plant. This Quality Assurance Program Description has been written to document the Hanford Waste Vitrification Plant Quality Assurance Program.

  19. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

    to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... preferences, recipients should not respond to the applicant actually hired on the basis of their (the recipients') racial preferences. My account decomposes the meritocratic ideal into four separate norms, one of which applies to recipients rather than to selectors. Finally, it defends the view that reaction...... qualifications based on antimeritocratic reactions, while not unproblematic, are not entirely irrelevant from the point of view of merit. Notably, selectors need not discount them when no one - including the targets of the objectionable preferences - is unfairly disadvantaged. Because not all problematic...

  20. Tests of cooling water pumps at Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Travnicek, J.

    1986-01-01

    Tests were performed to examine the operating conditions of the 1600 BQDV cooling pumps of the main coolant circuit of unit 1 of the Dukovany nuclear power plant. For the pumps, the performance was tested in the permissible operating range, points were measured below this range and the guaranteed operating point was verified. Pump efficiency was calculated from the measured values. The discussion of the measurement of parameters has not yet been finished because the obtained values of the amount delivered and thus of the pump efficiency were not up to expectation in all detail. It was also found that for obtaining the guaranteed flow the pump impeller had to be opened to 5deg -5.5deg instead of the declared 3deg. Also tested were pump transients, including the start of the pump, its stop, the operation and failure of one of the two pumps. In these tests, pressures were also measured at the inlet and the outlet of the inner part of the TG 11 turbine condenser. It was shown that the time course and the pressure course of the processes were acceptable. In addition to these tests, pressure losses in the condenser and the cooling water flow through the feed pump electromotor cooler wre tested for the case of a failure of one of the two pumps. (E.S.)

  1. The qualification of electrical components and instrumentations relevant to safety; La qualificazione dei componenti elettrici e di strumentazione rilevanti per la sicurezza

    Energy Technology Data Exchange (ETDEWEB)

    Zambardi, F [ENEA - Direzione Sicurezza Nucleare e Protezione Sanitaria, Divisione Sistemi Elettrici e Strumentazione, Rome (Italy)

    1989-03-15

    Systems and components relevant to safety of nuclear power plants must maintain their functional integrity in order to assure accident prevention and mitigation. Redundancy is utilized against random failures, nevertheless care must be taken to avoid common failures in redundant components. Main sources of degradation and common cause failures consist in the aging effects and in the changes of environmental conditions which occur during the plant life and the postulated accidents. These causes of degradation are expected to be especially significant for instrumentation and electrical equipment, which can have a primary role in safety systems. The qualification is the methodology by which component safety requirements can be met against the above mentioned causes of degradation. In this report the connection between the possible, plant conditions and the resulting degradation effects on components is preliminarily addressed. A general characterization of the qualification is then presented. Basis, methods and peculiar aspects are discussed and the qualification by testing is taken into special account. Technical and organizational aspects related to a plant qualification program are also focused. The report ends with a look to the most significant research and development activities. (author)

  2. Phased array UT (Ultrasonic Testing) used in electricity production plants

    International Nuclear Information System (INIS)

    Kodaira, Takeshi

    2012-01-01

    Phased Array-Ultrasonic testing techniques widely used for detection and quantitative determination of the lattice defects which have been formed from fatigues or stress corrosion cracking in the materials used in the electricity production plants are presented with particular focus on the accurate determination of the defects depth (sizing) and defects discrimination applicable to weld metals of austenite stainless steels and Ni base alloys. The principle of this non-destructive analysis is briefly explained, followed by point and matrix focus phased array methods developed by Mitsubishi Heavy Industries, Ltd are explained rather in detail with illustration and the evaluated results. (S. Ohno)

  3. High Temperature Materials Interim Data Qualification Report

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  4. NPP Krsko full scope simulator verification and qualification

    International Nuclear Information System (INIS)

    Krajnc, B.; Glaser, B.; Novsak, M.; Spiler, J.

    1998-01-01

    NPP Krsko (NEK) will, as a part of the Modernization plan, obtain also Krsko Full Scope Simulator (KFSS). Contract has been awarded to CAE Electronics for the design, construction and integration. KFSS will support in real time, the training for the complete range of operation, which can be performed from the main control room and some selected plant areas (remote shutdown panels, etc). Based on the lessons learned on development of NPP Krsko Basic Principle Simulator we decided for active approach. That means that NPP Krsko personnel will be heavily involved into all phases of KFSS development and testing. Since NPP Krsko is going to replace the existing steam generators, raise the nominal power and perform necessary modifications to support the power uprate, it was decided that the development of the KFSS will be conducted in two steps: 1. Development of the models as well as all the hardware interface in the MCR for the existing plant Cycle 15 and then, 2. Models and hardware will be modified, added or replaced as needed to take into account the steam generator replacement and plant uprate projects. In spite of the fact that the simulator will be used for the training of the plant operators for the uprated conditions and with new steam generators, the upper described approach was selected since we want to be sure that the models will at the beginning adequately simulate the existing plant. For the existing conditions we have available reference data for different plant conditions, as well as data for different plant transients. By verifying that simulator will be able adequately simulate the existing conditions the level of confidence for the uprated simulator will be much higher. This is of special importance since it will support initial training for modernized plant conditions. In this paper the plan for verification and qualification of KFSS as well as the amount of the work needed on NPP Krsko side to develop the test acceptance criteria will be presented.(author)

  5. NRC Information No. 88-04: Inadequate qualification and documentation of fire barrier penetration seals

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    The current NRC review was prompted by reports, inspection findings, allegations, and other information that indicated the possibility that NRC requirements for fire barrier penetration seals were not being met in all aspects. The review included: evaluations of fire barrier penetration seal specifications and procedures developed by licensees, licensee agents, and licensee contractors; evaluations of various fire barrier penetration seal tests and test data; and inspections of various fire barrier penetrations seal designs and installations. The types of concerns identified to date and mentioned below are related to weaknesses in the implementation of NRC requirements and guidelines as related to fire barrier penetration seal design qualification. The NRC review also has identified a current practice that can affect the qualification status of installed seals. Plant modifications are being made that require running new cable and conduits through existing penetration seals. These modifications are generally being made without an associated technical review to ensure that the resulting penetration seal design configuration or design parameters are consistent with those validated by initial qualification tests. Over a period of time, numerous minor modifications to the same area could cumulatively result in a degraded fire barrier rating

  6. REGULATION OF NATIONAL QUALIFICATIONS SYSTEMS

    Directory of Open Access Journals (Sweden)

    Anna A. Muravyeva

    2014-01-01

    Full Text Available The paper looks into the diverse aspects of qualifications system regulation, designed for balancing the supply and demand in the labor and educational service markets. Both the objects and mechanisms of such regulation are described. Special attention is given to institutions, involved in regulation of qualifications, and their jurisdiction. Another emphasis is on the industry-related regulation of qualifications which proved to be effective both on the national and European level. Such structures were first established on the national levels to regulate the qualifications and ensure their comparability and compatibility, given the economic globalization and growing labor and academic mobility. The author points out the role of the ministries of education and labor in maintaining a steady qualifications system, and outlines the positive experience of Great Britain using the industry councils for continuing development of qualifications system.

  7. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  8. PIE of test assembly of Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Ran, M.; Yan, J.; Wang, S.

    2000-01-01

    The small dimensional test fuel assembly (3x3-2) for the Qinshan Nuclear Power Plant was irradiated up to 25.7 Gwd/tU in the in-pile loop (15.5 Mpa,320 C) in Heavy Water Research Reactor (HWRR), CIAE, at simulative condition to Qinshan PWR normal and short time overpower operation for verifying the design, technology, and material properties of the fuel assembly. Comprehensive post-irradiation examination (PIE) including dimension measurement, gamma scanning, eddy current test, X ray, radiography, measurement of fission gas release, and quantitative metallography etc. were performed. PIE results show that the diameter of the fuel rods changed, ridges appeared on the cladding, pellets swelled, and the rate of fission gas release was higher than what we expected. The results would be an important basis for further improvement of design, technology and material properties for Qinshan PWR assembly. (author)

  9. Improvements to a uranium solidification process by in-plant testing

    International Nuclear Information System (INIS)

    Rindfleisch, J.A.

    1984-01-01

    When a process is having operational or equipment problems, often there is not enough time or money available for an extensive pilot plant program. This is when in-plant testing becomes imperative. One such process at the Idaho Chemical Processing Plant (ICPP) to undergo such an in-plant testing program was the uranium product solidification (denitrator) system. The testing program took approximately six months of in-plant testing that would have required at least two years of pilot plant preparation and operation to obtain the same information. This paper describes the results of the testing program, and the equipment and procedural changes

  10. Fuel staging tests at the Kymijaervi power plant

    International Nuclear Information System (INIS)

    Kivelae, M.; Rotter, H.; Virkki, J.

    1990-01-01

    The aim of this study was to measure nitrogen oxide (NO x ) emissions and find the methods to reduce them in plants using coal and natural gas as fuel. The tests involved were made at the Kymijaervi Power Plant, Lahti, Finland. Coal and natural gas was used alone or mixed. With natural gas when using flue gas recirculation, the NO x emission level dropped from 330 mg/m 3 down to 60 mg/m 3 . A negative side effect was that the flue gas temperature increased. At coal combustion and staged combustion, the flue gas recirculation had no significant effect on the NO x emission level. At coal combustion, the staging of combustion air halved the NO x emission but the combustibles increased strongly. With fuel staging, using coal as main fuel and gas as staging fuel, the NO x emission level was decreased from 340 mg/m 3 to 170 mg/m 3 . At the same time the combustibles increased 2 %- units. Also the flue gas temperature increased a little. At the tests, the proportion of natural gas was rather high, one third of the fuel energy input, but it could not be decreased, because the gas flow ratio was already too low to ensure good mixing

  11. Environmental qualification program for Krsko NPP

    International Nuclear Information System (INIS)

    Cerjak, J.; Klenovsek, P.; Pavsek, J.; Freeland, K.R.; Spalj, S.

    1998-01-01

    NEK plant components, including those critical to safe plant operation, deteriorate and wear over service life due to the effects of aging and harsh environmental conditions. Since the plant environment is a source of common-cause failures, an Environmental Qualification (EQ) program is required to ensure and demonstrate the ability of safety-related equipment to perform its design safety function during a design-basis (DBE), even after aging over its service life in the plant. EQ is a requirement for plants licensed by the US NRC, in accordance with 10 CFR 50.49, Regulatory Guide 1.89, NUREG-0588, and IEEE-323. This paper presents the current EQ Program status at Krsko NPP.(author)

  12. Possibilities of avoidance and control of bacterial plant diseases when using pathogen-tested (certified) or - treated planting material

    NARCIS (Netherlands)

    Janse, J.; Wenneker, M.

    2002-01-01

    Testing of planting material for freedom from phytopathogenic bacteria is an important, although not exclusive, method for control of bacterial diseases of plants. Ideally, pathogen-free or pathogen-/disease-resistant planting material is desirable, but this situation is not always possible on a

  13. Technical specifications on the welding in fuel reprocessing plants

    Energy Technology Data Exchange (ETDEWEB)

    Karino, Motonobu; Uryu, Mitsuru; Matsui, N.; Nakazawa, Fumio; Imanishi, Makoto; Koizumi; Kazuhiko; Sugawara, Junichi; Tanaka, Hideo

    1999-04-01

    The past specifications SGN of the welding in JNC was reexamined for the reprocessing plants in order to further promote the quality control. The specification first concerns the quality of raw materials, items of the quality tests, material management, and qualification standards of the welders. It extends over details of the welding techniques, welding design, welding testings, inspection and the judgment standards. (H. Baba)

  14. Qualification standard for photovoltaic concentrator modules

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R.; Kurtz, S.; Bottenberg, W. R.; Hammond, R.; Jochums, S. W.; McDanal, A. J.; Roubideaux, D.; Whitaker, C.; Wohlgemuth, J.

    2000-05-05

    The paper describes a proposed qualification standard for photovoltaic concentrator modules. The standard's purpose is to provide stress tests and procedures to identify any component weakness in photovoltaic concentrator modules intended for power generation applications. If no weaknesses are identified during qualification, both the manufacturer and the customer can expect a more reliable product. The qualification test program for the standard includes thermal cycles, humidity-freeze cycles, water spray, off-axis beam damage, hail impact, hot-spot endurance, as well as electrical tests for performance, ground continuity, isolation, wet insulation resistance, and bypass diodes. Because concentrator module performance can not be verified using solar simulator and reference cell procedures suitable for flat-plate modules, the standard specifies an outdoor I-V test analysis allowing a performance comparison before and after a test procedure. Two options to this complex analysis are the use of a reference concentrator module for side-by-side outdoor comparison with modules undergoing various tests and a dark I-V performance check.

  15. Operating reliability of valves in French pressurized water nuclear power plants

    International Nuclear Information System (INIS)

    Conte

    1986-10-01

    Taking into account the large numbers of valves (about 10000) of a PWR nuclear power plant, the importance of some valves in the safety functions and the cost resulting from their unavailability, the individual operability of these equipments has to be ensured at a high reliability level. This assurance can be obtained by means of an effort at all the stages which contribute to the quality of the product: design, qualification tests, fabrication, tests at the start-up stage, maintenance and tests during the power plant operation, experience feedback. This paper emphasizes more particularly on the tests carried out on loops of qualification [fr

  16. Stress test of the nuclear power plants performed in Taiwan

    Energy Technology Data Exchange (ETDEWEB)

    Wu, C.H.; Teng, W.C.; Chang, S.; Chen, Y.B. [Atomic Energy Council, Taipei, Taiwan (China)

    2014-07-01

    In the wake of Japan's Fukushima Daiichi Nuclear Power Plants event, the Atomic Energy Council (AEC) has asked Taiwan's Nuclear Power Plant operator (TPC) to re-examine and re-evaluate the vulnerabilities of its nuclear units, and furthermore, take possible countermeasures against extreme natural disasters, including earthquake, tsunami and rock-and-mud slide. The evaluation process should be based on both within and beyond Design Basis Accidents, by reference to the actions recommended by the world nuclear authorities and groups, namely, IAEA, USNRC, NEI, ENSREG and WANO. Taiwan is a very densely populated region of the world. Furthermore, like Japan, due to its geophysical position, Taiwan is prone to large scale earthquakes, and although historically rare, Taiwan also faces the potential risk of tsunamis. AEC also asked TPC to perform the stress test following the specification given by WENRA (later ENSREG) and conducted in all the EU's nuclear reactors. After completion of the stress test for all the nuclear power plants, AEC was trying to have the reports peer reviewed by international organizations, as EU did. The OECD/NEA accepted AEC's request and formed a review team specific to the review of Taiwan's National Report for the Stress Test. There were 18 follow-up items after the NEA's review. Based on these items, AEC developed five orders to require TPC further enhancing their capabilities to cope with extreme natural hazards. The ENSREG also formed a nine-expert review team for Taiwan's Stress Test in response to AEC's request almost at the same time as the OECD/NEA. The ENSREG review team began their works in June 2013 by desktop review, and ended in early October 2013 by country visit to Taiwan. While the assessment of post-Fukushima evaluation reveals neither immediate nuclear safety concerns nor threats to the public health and safety, AEC requested that TPC focus on strengthening its re-evaluation on design

  17. Stress test of the nuclear power plants performed in Taiwan

    International Nuclear Information System (INIS)

    Wu, C.H.; Teng, W.C.; Chang, S.; Chen, Y.B.

    2014-01-01

    In the wake of Japan's Fukushima Daiichi Nuclear Power Plants event, the Atomic Energy Council (AEC) has asked Taiwan's Nuclear Power Plant operator (TPC) to re-examine and re-evaluate the vulnerabilities of its nuclear units, and furthermore, take possible countermeasures against extreme natural disasters, including earthquake, tsunami and rock-and-mud slide. The evaluation process should be based on both within and beyond Design Basis Accidents, by reference to the actions recommended by the world nuclear authorities and groups, namely, IAEA, USNRC, NEI, ENSREG and WANO. Taiwan is a very densely populated region of the world. Furthermore, like Japan, due to its geophysical position, Taiwan is prone to large scale earthquakes, and although historically rare, Taiwan also faces the potential risk of tsunamis. AEC also asked TPC to perform the stress test following the specification given by WENRA (later ENSREG) and conducted in all the EU's nuclear reactors. After completion of the stress test for all the nuclear power plants, AEC was trying to have the reports peer reviewed by international organizations, as EU did. The OECD/NEA accepted AEC's request and formed a review team specific to the review of Taiwan's National Report for the Stress Test. There were 18 follow-up items after the NEA's review. Based on these items, AEC developed five orders to require TPC further enhancing their capabilities to cope with extreme natural hazards. The ENSREG also formed a nine-expert review team for Taiwan's Stress Test in response to AEC's request almost at the same time as the OECD/NEA. The ENSREG review team began their works in June 2013 by desktop review, and ended in early October 2013 by country visit to Taiwan. While the assessment of post-Fukushima evaluation reveals neither immediate nuclear safety concerns nor threats to the public health and safety, AEC requested that TPC focus on strengthening its re-evaluation on design

  18. Establishment of an unrelated umbilical cord blood bank qualification program: ensuring quality while meeting Food and Drug Administration vendor qualification requirements.

    Science.gov (United States)

    Rabe, Fran; Kadidlo, Diane; Van Orsow, Lisa; McKenna, David

    2013-10-01

    Qualification of a cord blood bank (CBB) is a complex process that includes evaluation of multiple aspects of donor screening and testing, processing, accreditation and approval by professional cell therapy groups, and results of received cord blood units. The University of Minnesota Medical Center Cell Therapy Laboratory has established a CBB vendor qualification process to ensure the CBB meets established regulatory and quality requirements. The deployed qualification of CBBs is based on retrospective and prospective review of the CBB. Forty-one CBBs were evaluated retrospectively: seven CBBs were disqualified based on failed quality control (QC) results. Eight CBBs did not meet the criteria for retrospective qualification because fewer than 3 cord blood units were received and the CBB was not accredited. As of March 2012, three US and one non-US CBBs have been qualified prospectively. One CBB withdrew from the qualification process after successful completion of the comprehensive survey and subsequent failure of the provided QC unit to pass the minimum criteria. One CBB failed the prospective qualification process based on processing methods that were revealed during the paper portion of the evaluation. A CBB qualification process is necessary for a transplant center to manage the qualification of the large number of CBBs needed to support a umbilical cord blood transplantation program. A transplant center that has utilized cord blood for a number of years before implementation of a qualification process should use a retrospective qualification process along with a prospective process. © 2013 American Association of Blood Banks.

  19. Impact of the draft DOE Training and Qualification Standard on an established training and qualification program

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1999-01-01

    One of the provisions of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 97-2 was that the US Department of Energy (DOE) hor e llipsis Develop and institute ahor e llipsiscourse in criticality and criticality safety hor e llipsis to serve as the foundation for a program of formal qualification of criticality engineers. In response, a draft DOE standard establishing requirements for a formal qualification program for nuclear criticality safety (NCS) engineers has been prepared and is currently in review. The Oak Ridge Y-12 plant implemented a formal training and qualification program for NCS engineers in 1995. The program complies with existing DOE requirements. The program was developed using a performance-based systematic approach to training and is accomplished through structured mentoring where experienced personnel interact with candidates through various learning exercises. Self-study, exercises, and work under instruction are all utilized. The candidate's performance is evaluated by mentors and oral boards. Competency gained through experience at other sites can also be credited. Technical portions of the program are primarily contained in an initial Engineer-in-Training segment and in subsequent task-specific qualifications. The Engineer-in-Training segment exposes the candidate to fundamental NCS concepts through example problems; ensures the initial compliance training requirements are met; and includes readings from applicable procedures, technical documents, and standards. Upon completion of this initial training, candidates proceed to task qualifications. Tasks are defined NCS activities such as operational reviews, criticality safety evaluations, criticality safety computations, criticality accident alarm system (CAAS) evaluations, support for emergency management, etc. Qualification on a task basis serves to break up training into manageable pieces and expedites qualification of candidates to perform specific production activities. The

  20. Framework of orientation for the discussion of measures required to maintain and further the expert knowledge and qualification of nuclear power plant managers and supervisors

    International Nuclear Information System (INIS)

    Farber, G.

    1984-01-01

    This report is focussed on the important aspects of the training and retraining of nuclear power plant managers and supervisors. The functional levels of the onsite operating organization of nine nuclear power plants are described and analyzed in order to determine the comparability of management positions as well as the responsibilities of the job incumbents. Retraining requirements are suggested depending on position, responsibilities, and relevance to safety. The manager's role in case of emergencies leads to specific demands with regard to regular training to cope with inadequate core cooling and to mitigate accidents. (orig.) [de

  1. Results of a literature review on the environmental qualification of low-voltage electric cables

    International Nuclear Information System (INIS)

    Lofaro, R.; Lee, B.; Villaran, M.; Gleason, J.; Aggarwal, S.

    1995-01-01

    In the design of nuclear power plants in the US, safety-related electric equipment must be qualified to provide reasonable assurance it can withstand the effects of a design basis event (DBE) and still be able to perform its prescribed safety function, even if the accident were to occur at the end of its service life. The requirement for environmental qualification (EQ) originates from the General Design Criteria in the Code of Federal Regulations, Title 10, Part 50 (10 CFR 50). The acceptable method of performing the qualification of this equipment has evolved over the years, starting with the NRC Division of Operating Reactors (DOR) Guidelines, which were issued in Bulletin 79--01B, and NUREG-0588 requirements and ending with the current EQ Rule, 10 CFR 50.49. While the EQ methods described in these documents have the same overall objective, there are some notable differences for which a clear technical basis has not been established. One difference is the preaging requirement for equipment prior to LOCA testing. In addition, specific issues related to current EQ practices have been raised by the US NRC which need to be addressed. These issues, which are discussed in detail later in this paper, are related to the sources of conservatism and uncertainty in IEEE Standard 323--1974, which is the qualification standard currently endorsed by the NRC. To address these issues, the NRC Office of Nuclear Reactor Regulation (NRR) implemented a Task Action Plan (TAP), and the Office of Nuclear Reactor Research (RES) initiated a complementary research program. The current focus of this program is on the qualification of low-voltage instrumentation and control cables. These cables were selected since they are not typically replaced on a routine basis, and their degradation could impact plant safety

  2. Test operation of the uranium ore processing pilot plant and uranium conversion plant

    International Nuclear Information System (INIS)

    Suh, I.S.; Lee, K.I.; Whang, S.T.; Kang, Y.H.; Lee, C.W.; Chu, J.O.; Lee, I.H.; Park, S.C.

    1983-01-01

    For the guarantee of acid leaching process of the Uranium Ore Processing Pilot Plnat, the KAERI team performed the test operation in coorperation with the COGEMA engineers. The result of the operation was successful achieving the uranium leaching efficiency of 95%. Completing the guarentee test, a continuous test operation was shifted to reconform the reproducibility of the result and check the functions of every units of the pilot plant feeding the low-grade domestic ore, the consistency of the facility was conformed that the uranium can easily be dissolved out form the ore between the temperature range of 60degC-70degC for two hours of leaching with sulfuric acid and could be obtained the leaching efficiency of 92% to 95%. The uranium recovery efficiencies for the processes of extraction and stripping were reached to 99% and 99.6% respectively. As an alternative process for the separation of solid from the ore pulp, four of the Counter Current Decanters were shifted replacing the Belt Filter and those were connected in a series, which were not been tested during the guarantee operation. It was found out that the washing efficiencies of the ore pulp in each tests for the decanters were proportionally increased according to the quantities of the washing water. As a result of the test, it was obtained that washing efficiencies were 95%, 85%, 83% for the water to ore ratio of 3:1, 2:1, 1.5:1 respectively. (Author)

  3. Experience on environmental qualification of safety-related components for Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Yu, A.S.; Kukreti, B.M.

    1987-01-01

    The proliferation of Nuclear Power Plant safety concerns has lead to increasing attention over the Environmental Qualification (EQ) of Nuclear Power Plant Safety-Related Components to provide the assurance that the safety related equipment will meet their intended functions during normal operation and postulated accident conditions. The environmental qualification of these components is also a Licensing requirement for Darlington Nuclear Generating Station. This paper provides an overview of EQ and the experience of a pilot project, in the qualification of the Main Moderator System safety-related functions for the Darlington Nuclear Generating Station currently under construction. It addresses the various phases of qualification from the identification of the EQ Safety-Related Components List, definition of location specific service conditions (normal, adbnormal and accident), safety-related functions, Environmental Qualification Assessments and finally, an EQ system summary report for the Main Moderator System. The results of the pilot project are discussed and the methodology reviewed. The paper concludes that the EQ Program developed for Darlington Nuclear Generating Station, as applied to the qualification of the Main Moderator System, contained all the elements necessary in the qualification of safety-related equipment. The approach taken in the qualification of the Moderator safety-related equipment proves to provide a sound framework for the qualification of other safety-related components in the station

  4. Techniques of the snubber testing in a nuclear power plant

    International Nuclear Information System (INIS)

    Hong, Soon Sin; Kim, Byung Chul

    1994-05-01

    The performance of PSI/ISI is one of the important inspections which improve the safety, reliability and operability of nuclear power plant. Therefore, KAERI has performed the inspections for the safety-related piping systems, pressure vessel and support components of NPP by the NDT methods in accordance with the related technical codes and standards. ASME Sec.XI of 1989 requires to perform the visual inspection and functional test of snubbers in accordance with ASME/ANSI OM-Part 4 additionally. Especially, the inspection and functional test of heavy duty hydraulic snubbers attached to the steam generator and RC pump have also been added. The main role of snubbers protects the piping system and pressure vessel from the transient events such as water hammer and earthquake during operation. Throughout the analysis of the status of snubbers in NPP, the snubber failure cases in domestic and foreign countries, the requirements and technical standards of the inspection and test, problems of snubbers in NPP, and snubber reduction program, this report requires to follow the technical codes and standards for the inspection and functional test of snubbers now being insufficient in Korean NPP. As a following action, the safety verification analysis for the reliability of piping systems and components of NPP due to snubber failure causes will be studied, and also the snubber reduction program of NPP will simplify the control and maintenance of the expensive snubbers. The objective of this report is to provide the problems of snubber in Korean NPP and contribute to the integrity assurance of the piping systems and components by the inspection and test of snubbers. 17 figs., 9 tabs., 19 refs. (Author)

  5. Chinese nuclear heating test reactor and demonstration plant

    International Nuclear Information System (INIS)

    Wang Dazhong; Ma Changwen; Dong Duo; Lin Jiagui

    1992-01-01

    In this report the importance of nuclear district heating is discussed. From the viewpoint of environmental protection, uses of energy resources and transport, the development of nuclear heating in China is necessary. The development program of district nuclear heating in China is given in the report. At the time being, commissioning of the 5 MW Test Heating Reactor is going on. A 200 MWt Demonstration Plant will be built. In this report, the main characteristics of these reactors are given. It shows this type of reactor has a high inherent safety. Further the report points out that for this type of reactor the stability is very important. Some experimental results of the driving facility are included in the report. (orig.)

  6. WIPP [Waste Isolation Pilot Plant] test phase plan: Performance assessment

    International Nuclear Information System (INIS)

    1990-04-01

    The U.S. Department of Energy (DOE) is responsible for managing the disposition of transuranic (TRU) wastes resulting from nuclear weapons production activities of the United States. These wastes are currently stored nationwide at several of the DOE's waste generating/storage sites. The goal is to eliminate interim waste storage and achieve environmentally and institutionally acceptable permanent disposal of these TRU wastes. The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being considered as a disposal facility for these TRU wastes. This document describes the first of the following two major programs planned for the Test Phase of WIPP: Performance Assessment -- determination of the long-term performance of the WIPP disposal system in accordance with the requirements of the EPA Standard; and Operations Demonstration -- evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP underground facility. 120 refs., 19 figs., 8 tabs

  7. Improvement and qualification of ultrasonic testing of dissimilar welds in the primary circuit of NPPs; Verbesserung und Qualifizierung der Ultraschallpruefung von Mischnaehten im Primaerkreis von KKW

    Energy Technology Data Exchange (ETDEWEB)

    Mitzscherling, Steffen; Barth, Enrico; Homann, Tobias; Prager, Jens [Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin (Germany); Goetschel, Sebastian; Weiser, Martin [Konrad-Zuse-Zentrum fuer Informationstechnik Berlin (ZIB) (Germany)

    2017-08-01

    The austenitic and dissimilar welds found in the primary circuit of nuclear power plants are not only extremely relevant to safety but also place very high demands on material testing. In addition to limited accessibility, the macroscopic structure of the weld seam is of paramount importance for ultrasound testing. In order to reliably determine material errors in position and size, the grain orientations and the elastic constants of the anisotropic weld bead structure must be known. The following work steps are used for the imaging representation of possible material defects: First, the weld seam is sounded in order to be able to determine important weld seam parameters, such as, for example, the grain orientation, using an inverse method. On the basis of these parameters, the sound paths are simulated in the next step by means of raytracing (RT). Finally, this RT simulation is assigned the measurement data (A-scans) from different transmitter and receiver positions and superimposed according to the Synthetic Aperature Focusing Technique (SAFT) method. The combination of inverse process, RT and SAFT also ensures a correct visualization of the faults in anisotropic materials. We explain these three methods and present the test arrangement of test specimens with artificial test errors. Measurement data as well as their evaluation are compared with the results of a CIVA simulation. [German] Die im Primaerkreislauf von Kernkraftwerken anzutreffenden austenitischen Schweiss- und Mischnaehte sind nicht nur extrem sicherheitsrelevant, sondern stellen auch sehr hohe Anforderungen an die Materialpruefung. Neben der eingeschraenkten Zugaenglichkeit ist das makroskopische Gefuege der Schweissnaht fuer die Pruefung mit Ultraschall von hoechster Bedeutung. Um Materialfehler zuverlaessig in Position und Groesse bestimmen zu koennen, muessen die Kornorientierungen und die elastischen Konstanten des anisotropen Schweissnahtgefueges bekannt sein. Fuer die bildgebende Darstellung

  8. NOx Abatement Pilot Plant 90-day test results report

    International Nuclear Information System (INIS)

    McCray, J.A.; Boardman, R.D.

    1991-01-01

    High-level radioactive liquid wastes produced during nuclear fuel reprocessing at the Idaho Chemical Processing Plant are calcined in the New Waste Calcining Facility (NWCF) to provide both volume reduction and a more stable waste form. Because a large component of the HLW is nitric acid, high levels of oxides of nitrogen (NO x ) are produced in the process and discharged to the environment via the calciner off-gas. The NO x abatement program is required by the new Fuel Processing Restoration (FPR) project permit to construct to reduce NO x emissions from the NWCF. Extensive research and development has indicated that the selective catalytic reduction (SCR) process is the most promising technology for treating the NWCF off-gas. Pilot plant tests were performed to determine the compatibility of the SCR process with actual NWCF off-gas. Test results indicate that the SCR process is a viable method for abating the NO x from the NWCF off-gas. Reduction efficiencies over 95% can be obtained, with minimal amounts of ammonia slip, provided favorable operating conditions exist. Two reactors operated with series flow will provide optimum reduction capabilities. Typical operation should be performed with a first reactor stage gas space velocity of 20,000 hr -1 and an inlet temperature of 320 degrees C. The first stage exhaust NO x concentration will then dictate the parameter settings for the second stage. Operation should always strive for a peak reactor temperature of 520 degrees C in both reactors, with minimal NH 3 slip from the second reactor. Frequent fluctuations in the NWCF off-gas NO x concentration will require a full-scale reduction facility that is versatile and quick-responding. Sudden changes in NWCF off-gas NO x concentrations will require quick detection and immediate response to avoid reactor bed over-heating and/or excessive ammonia slip

  9. Liquid Secondary Waste Grout Formulation and Waste Form Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Um, Wooyong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williams, B. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle M. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, Guohui [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-05-23

    This report describes the results from liquid secondary waste (LSW) grout formulation and waste form qualification tests performed at Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions (WRPS) to evaluate new formulations for preparing a grout waste form with high-sulfate secondary waste simulants and the release of key constituents from these grout monoliths. Specific objectives of the LSW grout formulation and waste form qualification tests described in this report focused on five activities: 1.preparing new formulations for the LSW grout waste form with high-sulfate LSW simulants and solid characterization of the cured LSW grout waste form; 2.conducting the U.S. Environmental Protection Agency (EPA) Method 1313 leach test (EPA 2012) on the grout prepared with the new formulations, which solidify sulfate-rich Hanford Tank Waste Treatment and Immobilization Plant (WTP) off-gas condensate secondary waste simulant, using deionized water (DIW); 3.conducting the EPA Method 1315 leach tests (EPA 2013) on the grout monoliths made with the new dry blend formulations and three LSW simulants (242-A evaporator condensate, Environmental Restoration Disposal Facility (ERDF) leachate, and WTP off-gas condensate) using two leachants, DIW and simulated Hanford Integrated Disposal Facility (IDF) Site vadose zone pore water (VZPW); 4.estimating the 99Tc desorption Kd (distribution coefficient) values for 99Tc transport in oxidizing conditions to support the IDF performance assessment (PA); 5.estimating the solubility of 99Tc(IV)-bearing solid phases for 99Tc transport in reducing conditions to support the IDF PA.

  10. Seismic qualification of the rotary relay for use in the solid state protection system

    International Nuclear Information System (INIS)

    Vogeding, E.L.; Jarecki, S.J.

    1976-01-01

    The seismic qualification of a rotary relay that can be used as a replacement for the type of relay located in the output section of the Solid State Protection System is described. The qualification test results indicate that the tested relays did not exhibit any contact bounce or abnormal operation; they performed satisfactorily before, during, and after the simulated seismic vibration tests

  11. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 5B. Experience data. Working material

    International Nuclear Information System (INIS)

    1996-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on the effects of Armenia earthquakes on selected power, industry and commercial facilities and seismic functional qualification of active mechanical and electrical components tested on shaking table

  12. Follow-up of the evolution of the characteristics and performance of the equipments tested during a KALI campaign

    International Nuclear Information System (INIS)

    Rouaud, J.

    1985-01-01

    One of the four parts of the K1 qualification of the 1E equipments concerns the design basis accidents. The KALI loops allows to create the thermodynamic conditions of these accidents. This paper presents the PROCESS II which concerns the installation of the equipment in conditions representative of those met in nuclear power plants, the control assurance before, during and after the thermodynamic test. A list of qualification tests carried out on the KALI loop is finally given [fr

  13. Nuclear Criticality Safety Organization qualification program. Revision 4

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1997-01-01

    The Nuclear Criticality Safety Organization (NCSO) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSO technical and managerial qualification as required by the Y-12 Training Implementation Matrix (TIM). It is implemented through a combination of LMES plant-wide training courses and professional nuclear criticality safety training provided within the organization. This Qualification Program is applicable to technical and managerial NCSO personnel, including temporary personnel, sub-contractors and/or LMES employees on loan to the NCSO, who perform the NCS tasks or serve NCS-related positions as defined in sections 5 and 6 of this program

  14. Training for the seismic qualification utility group (SQUG) generic implementation procedure (GIP) for verification of seismic effects on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Schaffstall, R.E.; Smith, N.P.; Baker, K.M.

    1993-01-01

    Resolution of USI A-46 was accomplished May, 1992 with the issuance of the SER for the GIP, Revision 2. The implementation of the resolution for the SQUG plants will be completed by 1996. Both the USNRC and the SQUG utilities have expended considerable resources to effect a common understanding that the effort has been worth the price. The Training Program developed to ensure that the efforts expended by the SQUG was indeed worth the price will be a major contributor in the success of the implementation. All of the older nuclear power plants in the United States now have an alternative standard to determine seismic resistance using experience data- a standard against which they can be evaluated and found seismically adequate to achieve and maintain a safe and reliable shutdown when subjected to strong motion earthquakes

  15. A methodology for evaluating ''new'' technologies in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Clark, R.L.; Holcomb, D.E.

    1994-01-01

    As obsolescence and spare parts issues drive nuclear power plants to upgrade with new technology (such as optical fiber communication systems), the ability of the new technology to withstand stressors present where it is installed needs to be determined. In particular, new standards may be required to address qualification criteria and their application to the nuclear power plants of tomorrow. This paper discusses the failure modes and age-related degradation mechanisms of fiber optic communication systems, and suggests a methodology for identifying when accelerated aging should be performed during qualification testing

  16. Test Results and Comparison of Triaxial Strength Testing of Waste Isolation Pilot Plant Clean Salt

    Energy Technology Data Exchange (ETDEWEB)

    Buchholz, Stuart A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-12-01

    This memorandum documents laboratory thermomechanical triaxial strength testing of Waste Isolation Pilot Plant (WIPP) clean salt. The limited study completed independent, adjunct laboratory tests in the United States to assist in validating similar testing results being provided by the German facilities. The testing protocol consisted of completing confined triaxial, constant strain rate strength tests of intact WIPP clean salt at temperatures of 25°C and 100°C and at multiple confining pressures. The stratigraphy at WIPP also includes salt that has been labeled “argillaceous.” The much larger test matrix conducted in Germany included both the so-called clean and argillaceous salts. When combined, the total database of laboratory results will be used to develop input parameters for models, assess adequacy of existing models, and predict material behavior. These laboratory studies are also consistent with the goals of the international salt repository research program. The goal of this study was to complete a subset of a test matrix on clean salt from the WIPP undertaken by German research groups. The work was performed at RESPEC in Rapid City, South Dakota. A rigorous Quality Assurance protocol was applied, such that corroboration provides the potential of qualifying all of the test data gathered by German research groups.

  17. Co-operation Equipment Qualification for Safety grade I and C Equipment between Russia and Korea

    International Nuclear Information System (INIS)

    Ham, J. K.; Lee, D. H.; Park, J. W.; Jeong, M. H.; Choi, Y. H.; Suh, J. J.; Jang, T. H.

    2007-06-01

    Equipment Qualification technology for I and C system on nuclear grade have been approved with accurate and safe for verifying and validation. It contributes to acknowledge of reliability and to review of user approval. Also it did not completely satisfied the requirement of Russia, it can be satisfied by bit of modification on design. It is expected to support the export of safety PLC to nuclear power plant. Proven EQ technology is required on the further markets of nuclear. Therefore, comparison test with foreign country is necessary to support the mutual accreditation of EQ for export of domestic products

  18. Co-operation Equipment Qualification for Safety grade I and C Equipment between Russia and Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ham, J. K.; Lee, D. H.; Park, J. W.; Jeong, M. H.; Choi, Y. H.; Suh, J. J.; Jang, T. H. [Korea Testing Laboratory, Seoul (Korea, Republic of)

    2007-06-15

    Equipment Qualification technology for I and C system on nuclear grade have been approved with accurate and safe for verifying and validation. It contributes to acknowledge of reliability and to review of user approval. Also it did not completely satisfied the requirement of Russia, it can be satisfied by bit of modification on design. It is expected to support the export of safety PLC to nuclear power plant. Proven EQ technology is required on the further markets of nuclear. Therefore, comparison test with foreign country is necessary to support the mutual accreditation of EQ for export of domestic products.

  19. Qualification test of few group constants generated from an MC method by the two-step neutronics analysis system McCARD/MASTER

    International Nuclear Information System (INIS)

    Park, Ho Jin; Shim, Hyung Jin; Joo, Han Gyu; Kim, Chang Hyo

    2011-01-01

    The purpose of this paper is to examine the qualification of few group constants estimated by the Seoul National University Monte Carlo particle transport analysis code McCARD in terms of core neutronics analyses and thus to validate the McCARD method as a few group constant generator. The two- step core neutronics analyses are conducted for a mini and a realistic PWR by the McCARD/MASTER code system in which McCARD is used as an MC group constant generation code and MASTER as a diffusion core analysis code. The two-step calculations for the effective multiplication factors and assembly power distributions of the two PWR cores by McCARD/MASTER are compared with the reference McCARD calculations. By showing excellent agreements between McCARD/MASTER and the reference MC core neutronics analyses for the two PWRs, it is concluded that the MC method implemented in McCARD can generate few group constants which are well qualified for high-accuracy two-step core neutronics calculations. (author)

  20. Performance test of nutrient control equipment for hydroponic plants

    Science.gov (United States)

    Rahman, Nurhaidar; Kuala, S. I.; Tribowo, R. I.; Anggara, C. E. W.; Susanti, N. D.

    2017-11-01

    Automatic control equipment has been made for the nutrient content in irrigation water for hydroponic plants. Automatic control equipment with CCT53200E conductivity controller to nutrient content in irrigation water for hydroponic plants, can be used to control the amount of TDS of nutrient solution in the range of TDS numbers that can be set according to the range of TDS requirements for the growth of hydroponically cultivated crops. This equipment can minimize the work time of hydroponic crop cultivators. The equipment measurement range is set between 1260 ppm up to 1610 ppm for spinach plants. Caisim plants were included in this experiment along with spinach plants with a spinach plants TDS range. The average of TDS device is 1450 ppm, while manual (conventional) is 1610 ppm. Nutrient solution in TDS controller has pH 5,5 and temperature 29,2 °C, while manual is pH 5,6 and temperature 31,3 °C. Manually treatment to hydroponic plant crop, yields in an average of 39.6 grams/plant, greater than the yield of spinach plants with TDS control equipment, which is in an average of 24.6 grams / plant. The yield of caisim plants by manual treatment is in an average of 32.3 grams/crop, less than caisim crop yields with TDS control equipment, which is in an average of 49.4 grams/plant.