  1. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  2. Optimizing cooling tower performance refrigeration systems, chemical plants, and power plants all have a resource quietly awaiting exploitation - cold water

    International Nuclear Information System (INIS)

    Burger, R.

    1993-01-01

    The cooling towers are hidden bonanzas for energy conservation and dollar savings when properly engineered and maintained. In many cases, the limiting factor of production is the quality and quantity of cold water coming off the cooling tower. The savings accrued in energy conservation and additional product manufactured can be an important factor on the operator's company's profit and loss sheet (7). Energy management analysis is a very important consideration in today's escalating climate of costs of energy. It is advisable to consider a thorough engineering inspection and evaluation of the entire plant to leave no stone unturned iii the search to reduce energy consumption (8). The cooling tower plays the major role on waste heat removal and should be given a thorough engineering inspection and evaluation by a specialist in this field. This can be performed at nominal cost and a formal report submitted with recommendations, budget costs, and evaluation of the thermal, structural, and mechanical condition of the equipment. This feasibility study will assist in determining the extent of efficiency improvement available with costs and projected savings. It can be stated that practically all cooling towers can be upgraded to perform at higher levels of efficiency which can provide a rapid, cost-effective payback. However, while all cooling tower systems might not provide such a dramatic cost payback as these case histories, the return of a customer's investment in upgrading his cooling tower can be a surprising factor of operation and should not be neglected

  3. Credential Application Awaiting Information

    Data.gov (United States)

    Department of Homeland Security — When a Credential application or required documentation is incomplete, an Awaiting Information letter is issued. The application process cannot continue until all...

  4. Plant Biology Science Projects.

    Science.gov (United States)

    Hershey, David R.

    This book contains science projects about seed plants that deal with plant physiology, plant ecology, and plant agriculture. Each of the projects includes a step-by-step experiment followed by suggestions for further investigations. Chapters include: (1) "Bean Seed Imbibition"; (2) "Germination Percentages of Different Types of Seeds"; (3)…

  5. Dispatchable Solar Power Plant Project

    Energy Technology Data Exchange (ETDEWEB)

    Price, Henry [Solar Dynamics LLC, Broomfield, CO (United States)

    2018-01-31

    As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines

  6. Collaborators await European approval of LHC

    CERN Multimedia

    Sweet, William N

    1994-01-01

    Physicists are awaiting the authorization of the proposed $2.5 billion European LHC. Germany, France, the UK and Switzerland are still arguing on how much extra contributions host countries should provide for the proton-proton collider's construction.

  7. IDPs from Kosovo still awaiting durable solutions

    Directory of Open Access Journals (Sweden)

    Anika Krstic

    2007-01-01

    Full Text Available As the Balkans anxiously await delayed UN recommendations on the final status of the Serbian province of Kosovo, displaced persons from Kosovo remain torn between uncertain return prospects and denial of local integration.

  8. Waste Treatment & Immobilization Plant Project

    Data.gov (United States)

    Federal Laboratory Consortium — In southeastern Washington State, Bechtel National, Inc. is designing, constructing and commissioning the world's largest radioactive waste treatment plant for the...

  9. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  10. South Texas Native Plant Restoration Project

    Science.gov (United States)

    2012-10-01

    The South Texas Native Plant Restoration Project was a resounding success in that the primary goal of : developing commercial sources of native seed has been substantially met. By the conclusion of the project : on August 31, 2011, 20 native seed sou...

  11. Adverse events while awaiting myocardial revascularization

    DEFF Research Database (Denmark)

    Head, Stuart J.; da Costa, Bruno R.; Beumer, Berend

    2017-01-01

    OBJECTIVES: The aim of the current study was to estimate adverse event rates while awaiting myocardial revascularization and review criteria for prioritizing patients. METHODS: A PubMed search was performed on 19 January 2015, to identify English-language, original, observational studies reportin...

  12. 1-MWp electrical photovoltaic plant (EPHOP - project)

    International Nuclear Information System (INIS)

    Vitanov, P.; Toneva, A.; Petkanchin, L.; Ivancheva, J.; Neshev, S.

    2000-01-01

    The presented project concerns the realization of a grid connected 1-MW p pilot photovoltaic plant on the territory of Bulgaria.The purpose of the project is to demonstrate and prove solar energy advantages. A special attention will be paid to the possibility the generated electricity to join the national electric network. The site selection according to the meteorological conditions as well as general aspects of the project are discussed

  13. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  14. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  15. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists the management of organizations responsible for Nuclear Power Plant Projects with significant delays with respect to the originally scheduled commercial operation. Several Member States have Nuclear Power Plant Projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules shows large variations due to several issues, including financial, economic and public opinion factors. Solving the special difficulties related with a delayed NPP project is problematic and dependent on the particular country situation. However it is not regarded as an isolated national problem but as a significant issue with a number of difficulties shared by several Member States. The IAEA collects information and supports the management of delayed NPP projects by identifying main common issues, gathering available experience and addressing specific needs. On this background the IAEA is in the position to provide unique impartial assistance based upon best international practices. This enables Member States to maintain readiness for resuming the project construction when the conditions permit and to strengthen management's abilities for the completion of the project. The IAEA's service is tailored to the needs and requirements of the requesting organization, implemented on-site by international experts and addresses areas such as project control measures, human resources, updating to technological and regulatory requirements, project data, nuclear safety review, physical protection and nuclear security and preparation to resume project construction and operation

  16. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  17. Management of delayed nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  18. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  19. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  20. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    Energy is essential for national development. Nearly every aspect of development - from reducing poverty and raising living standards to improving health care, industrial and agricultural productivity - requires reliable access to modern energy resources. States may have different reasons for considering starting a nuclear power project to achieve their national energy needs, such as: lack of available indigenous energy resources, the desire to reduce dependence upon imported energy, the need to increase the diversity of energy resources and/or mitigation of carbon emission increases. The start of a nuclear power plant project involves several complex and interrelated activities with long duration. Experience shows that the time between the initial policy decision by a State to consider nuclear power up to the start of operation of its first nuclear power plant is about 10 to 15 years and that before specific project management can proceed, several key infrastructure issues have to be in place. The proper management of the wide scope of activities to be planned and implemented during this period represents a major challenge for the involved governmental, utility, regulatory, supplier and other supportive organizations. The main focus is to ensure that the project is implemented successfully from a commercial point of view while remaining in accordance with the appropriate engineering and quality requirements, safety standards and security guides. This publication is aimed at providing guidance on the practical management of a first nuclear power project in a country. There are many other issues, related to ensuring that the infrastructure in the country has been prepared adequately to ensure that the project will be able to be completed, that are only briefly addressed in this publication. The construction of the first nuclear power plant is a major undertaking for any country developing a nuclear power programme. Worldwide experience gained in the last 50 years

  1. Wind Plant Performance Prediction (WP3) Project

    Energy Technology Data Exchange (ETDEWEB)

    Craig, Anna [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-26

    The methods for analysis of operational wind plant data are highly variable across the wind industry, leading to high uncertainties in the validation and bias-correction of preconstruction energy estimation methods. Lack of credibility in the preconstruction energy estimates leads to significant impacts on project financing and therefore the final levelized cost of energy for the plant. In this work, the variation in the evaluation of a wind plant's operational energy production as a result of variations in the processing methods applied to the operational data is examined. Preliminary results indicate that selection of the filters applied to the data and the filter parameters can have significant impacts in the final computed assessment metrics.

  2. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  3. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  4. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  5. Decommissioning project of commercial nuclear power plant

    International Nuclear Information System (INIS)

    Karigome, S.

    2008-01-01

    Decommissioning project of commercial nuclear power plant in Japan was outlined. It is expected that the land, after the decommissioning of commercial nuclear power plants, will serve as sites for new plants. Steps will be taken to reduce the amount of wastes generated and to recycle/reuse them. Wastes with a radioactivity concentration below the 'clearance level' need not be dealt with as radioactive material, and may be handled in the same way as conventional wastes. The Tokai-1 power station, a 166 MWe carbon dioxide cooled reactor which closed down in 1998, is being decommissioned and the first ten years as 'safe storage' to allow radioactivity to decay. Non-reactor grade components such as turbines were already removed, heat exchanger dismantling started and the reactor will be dismantled, the buildings demolished and the site left ready for reuse. All radioactive wastes will be classified as low-level wastes in three categories and will be buried under the ground. The total cost will be 88.5 billion yen -34.7 billion for dismantling and 53.8 billion for waste treatment including the graphite moderator. (T. Tanaka)

  6. Successful Training Development and Implementation in Plant Modernization Projects

    International Nuclear Information System (INIS)

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  7. Energy analysis and projecting of power plants

    International Nuclear Information System (INIS)

    Jirlow, K.

    1975-01-01

    Energy analysis aims at a better explanation of energy flow and energy exchange at different production processes. In this report the energy budget is analysed for separate nuclear power plants and for expanding systems of power plants. A mathematical model is developed for linear and exponential expanding of nuclear power. The profitableness for nuclear power plants in Sweden is considered to be good. (K.K.)

  8. Project management skills for nuclear power plants

    International Nuclear Information System (INIS)

    Bhatikar, R.J.

    2002-01-01

    Full text: The E and C Division of L and T has executed several power projects in India and abroad and thus possesses the requisite wherewithal to execute nuclear power projects on a fast track basis. To achieve this L and T has set up a separate Strategic Business Unit (SBU) to have a focused attention to the nuclear power industry in the country. All the four important and necessary hallmarks for successful implementation of any project namely (i) engineering capabilities, (ii) sophisticated project management tools, (iii) ability to mobilize resources, and (iv) skilled personnel to execute the project have been adequately addressed. These could be realized either by establishing fruitful collaborations with other specialist Companies and/or creating powerful and multitasking software tools for effective implementation. The execution of nuclear power projects on a fast track basis could be implemented by following the EPC route and by minimizing the number of packages. Details of this scheme for project implementation will be highlighted during the talk

  9. Compost plant of Medellin - An interesting project

    International Nuclear Information System (INIS)

    Bedoya V, Julian; Arango M, Carlos Andres

    1998-01-01

    Empresas varias de Medellin acquired a composting plant (solid waste treatment plant) in the beginning of the 70's. This plant, manufactured in Spain, using French technology, started operation in 1972. It was bought from the machinery Pascua Hermanos y Compania ltda. Spanish consortium. The total investment cost by 1971 was of about $ 20' 000, 000 Colombian pesos. The composting plant was designed as a partial solution (180t/day) to the disposal of about 400 t/days of solid waste disposal in Medellin city. The operation steps of the plant were: collection cars into one of the three hoppers dumped solid waste. Then recyclable material was picked up by hand in a flat conveyor. Hammer mills, where non-crushable material was separated and collected in a reject conveyor, crushed organic material. Afterwards, organic material was screened and was taken by another conveyor into a rotary trommel where manure and organic wastes from the cattle market Plaza de Ferias, and from the municipal slaughterhouse, was planned to be added (this operation was never implemented). The organic portion was separated magnetically from ferrous materials and then conducted to the fermenting aisle, where it stayed for nine days; oxidation was increased by aeration by Archimedes screws. Product coming from the fermenting aisle was discharged in a screening system to classify the compost by granulometry. Again strange elements where taken away from the compost using collision with a ballistic separator. Finally, weight and size, and using belt conveyors and a rotary distributor classified compost, it was disposed in a open field, where it would stay for about thirty days. Social, technical, marketing, economic and administrative problems made difficult the operation of the plant that was closed down in 1985 and fully dismantled in 1988

  10. General criteria for the project of nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    1979-01-01

    Recommendations are presented establishing the general criteria for the project of nuclear fuel reprocessing plants to be licensed according to the legislation in effect. They apply to all the plant's systems, components and structures which are important to operation safety and to the public's health and safety. (F.E.) [pt

  11. Inventory of cassava plant protection and development projects in ...

    African Journals Online (AJOL)

    A total of 303 cassava protection and development projects were identified of which about half are plant protection-oriented. Most activities on cassava protection have been centred on biological control and host plant resistance. The least activity has been on chemical control. The applicability of the collected database is ...

  12. Plant automation-application to SBWR project

    International Nuclear Information System (INIS)

    Rodriguez Rodriguez, C.

    1995-01-01

    In accordance with the requirements set out in the URD (Utility Requirements Document) issued by the EPRI (Electrical Power Research Institute), the design of new reactors, whether evolutionary or passive, shall taken into account the systematic automation of functions relating to normal plant operation. The objectives established are to: =2E Simplify operator-performed tasks =2E Reduce the risk of operator-error by considering human factors in the allocation of tasks =2E Improve man-machine reliability =2E Increase the availability of the plant In previous designs, automation has only been considered from the point of view of compliance with regulatory requirements for safety-related systems, or in isolated cases, as a method of protecting the investment where there is a risk of damage to main equipment. The use of digital technology has prevented the systematic pursuit of such objectives in the design of automated systems for processes associated with normal plant operation (startup, load follow, normal shutdown, etc) from being excessively complex and therefore costly to undertake. This paper describes how the automation of the aforementioned normal plant operation activities has been approached in General Electric's SBWR (Simplified Boiling Water Reactor) design. (Author)

  13. Approaches to Teaching Plant Nutrition. Children's Learning in Science Project.

    Science.gov (United States)

    Leeds Univ. (England). Centre for Studies in Science and Mathematics Education.

    During the period 1984-1986, over 30 teachers from the Yorkshire (England) region have worked in collaboration with the Children's Learning in Science Project (CLIS) developing and testing teaching schemes in the areas of energy, particle theory, and plant nutrition. The project is based upon the constructivist approach to teaching. This document…

  14. Economic evaluation of nuclear plant project

    International Nuclear Information System (INIS)

    Tolba, Adel.

    1988-01-01

    The present work is an attempt to prepare a ''fair price'' estimate to serve as bench mark in the course of economic evaluation of bids to construct nuclear power plants. The methodology of determining the present value of all capital investment is used. Running costs of nuclear fuel, operation, and maintenance are also determined. As a result, levelized energy cost is calculated. Sensitivity analysis for different parameters has been conducted, and the results of which are included in this paper

  15. Cancellation of the Kaiseraugst nuclear power plant project

    International Nuclear Information System (INIS)

    Blocher, C.; Schoenenberger, J.; Stucky, G.

    1988-01-01

    The nuclear power plant project at Kaiseraugst has been worked on for over 20 years. In 1985 the Swiss Parliament decided to license the plant. The cost of the work to date is about 1.2 x10 6 Swiss Franks. Continuation of the project is only sensible if it can be realized within a foreseeable space of time. It is probable that the discussions concerning future energy, environment and safety will continue for a long time. If this is clear that the Kaiseraugst project will not be realized during the next five to ten years for social, civic and political reasons. A continuation of the project is not justifiable. Kernkraftwerk Kaiseraugst AG must be adequately compensated. A motion has been presented to Parliament which charges the Government to negotiate with Kernkraftwerk Kaiseraugst AG for cancellation of the project

  16. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  17. Plant Biology and Biogeochemistry Department annual project report 1999

    DEFF Research Database (Denmark)

    Jensen, A.; Gissel Nielsen, G.; Giese, H.

    2000-01-01

    The Department of Plant Biology and Biogeochemistry is engaged in basic and applied research to improve the scientific knowledge of developing new methods and technology for the future, environmentally benign industrial and agricultural production, thusexerting less stress and strain...... of Biomass, 3. DLF-Risø Biotechnology, 4. Plant Genetics and Epidemiology, 5. Biogeochemistry and 6. Plant Ecosystems and Nutrient Cycling. This electronicversion of the annual report from the Plant Biology and Biogeochemistry Department aims to provide information about the progress in our research. Each...... on the environment. This knowledge will lead to a greater prosperity and welfare for agriculture, industry and consumers in Denmark. The research approach in the Department is mainly experimental and the projects areorganized in six research programmes: 1. Plant-Microbe Symbioses, 2. Plant Products and Recycling...

  18. Project organization for automating an industrial power plant

    International Nuclear Information System (INIS)

    Williams, D.R.; McCowen, R.R.

    1988-01-01

    This paper reports on the controls for three boilers and three turbine generators at the power plant at the John Deere Waterloo Works that have been retrofit with a microprocessor based monitoring, control, and optimization system. The factors driving the project in the 15 mW, 500,000 lb/hr, 35 year old plant were reduced electricity costs due to peak shaving, energy conservation, labor savings, reduced maintenance costs and improved reliability. A turnkey design/build arrangement was sought after a preliminary study indicated an attractive return on investment Control system vendors and design/build contractors were evaluated using a group decision making method. A design/build contractor was chosen to do an in-depth study and write specifications for the control system were negotiated with the contractor The project was managed by the Power Plant and Energy Management Department, rather than by the staff department normally responsible for capital projects

  19. Instrumentation project of 3rd desalination plant at Tuas (Singapore)

    OpenAIRE

    Charco Iniesta, Sara

    2016-01-01

    This project consists on the description of instrumentation used in Tuas III desalination plant at Singapore and its flow process description. The project has been developed as part of the work of the instrumentation department of the responsible company of the engineering design of Tuas III desalination plant. First of all is important to know the water problems which suffer all the people who live in Singapore. Singapore is a city-state and is home to 5.5 million residents. The coun...

  20. Feasibility study of Pridneprovskaya Thermal Power Plant reconstruction project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  1. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  2. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  3. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  4. Engineering for new-built nuclear power plant projects

    International Nuclear Information System (INIS)

    Gonzalez Lopez, A.

    2012-01-01

    This article reviews the opportunities existing in the market (electrical utilities and reactor vendors) for an engineering company with the profile of Empresarios Agrupados (EA) in new-built nuclear power plant projects. To do this, reference is made to some representative examples of projects in which EA has been participating recently. the article concludes sharing with the reader some lessons learned from this participation. (Author)

  5. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  6. Conceptual project of waste treatment plant of CDTN

    International Nuclear Information System (INIS)

    Gabriel, J.L.; Astolfi, D.

    1983-01-01

    This paper presents the conceptual project of the waste treatment plant of CDTN. Several areas, such as: process area, material entrance and exit area are studied. The treatment processes are: evaporation, filtration, cementation, cutting and processing of solid wastes. (C.M.)

  7. Feasibility study on Bobovdol thermal power plant upgrading project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons of fuel oil equivalent. In addition, the reduction rate of global warming gas emission is 57.75%, and the cumulative reduction quantity in 41 years is 105.18 million tons. (NEDO)

  8. Economical aspects of a nuclear power plant project

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Santos, E.M. dos

    1992-01-01

    This work describes different aspects and parameters that should be regarded as guidelines for economic evaluation of small and medium power plant projects. The main objective of an economic evaluation is to establish the plant's unitary cost and its economic figure of merit. To achieve that, a number of studies must be undertaken to compare the global competitiveness of a nuclear power plant with other energetic alternatives. These studies involve macro economy, energy generation, electricity transmission and global feasibility of the enterprise. It is concluded that the economic evaluation of a nuclear power plant should be considered as the culmination of a long process of planning at a national level. The main reasons are the investments involved, the technological developments required and political implications of the utilization of nuclear power energy. (author)

  9. Conservation and restoration of indigenous plants to improve community livelihoods: the Useful Plants Project

    Science.gov (United States)

    Ulian, Tiziana; Sacandé, Moctar; Mattana, Efisio

    2014-05-01

    Kew's Millennium Seed Bank partnership (MSBP) is one of the largest ex situ plant conservation initiatives, which is focused on saving plants in and from regions most at risk, particularly in drylands. Seeds are collected and stored in seed banks in the country of origin and duplicated in the Millennium Seed Bank in the UK. The MSBP also strengthens the capacity of local communities to successfully conserve and sustainably use indigenous plants, which are important for their wellbeing. Since 2007, high quality seed collections and research information have been gathered on ca. 700 useful indigenous plant species that were selected by communities in Botswana, Kenya, Mali, Mexico and South Africa through Project MGU - The Useful Plants Project. These communities range from various farmer's groups and organisations to traditional healers, organic cotton/crop producers and primary schools. The information on seed conservation and plant propagation was used to train communities and to propagate ca. 200 species that were then planted in local gardens, and as species reintroduced for reforestation programmes and enriching village forests. Experimental plots have also been established to further investigate the field performance (plant survival and growth rate) of indigenous species, using low cost procedures. In addition, the activities support revenue generation for local communities directly through the sustainable use of plant products or indirectly through wider environmental and cultural services. This project has confirmed the potential of biodiversity conservation to improve food security and human health, enhance community livelihoods and strengthen the resilience of land and people to the changing climate. This approach of using indigenous species and having local communities play a central role from the selection of species to their planting and establishment, supported by complementary research, may represent a model for other regions of the world, where

  10. Tecnatom support to new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, A. B.

    2009-10-01

    Tecnatom is a Spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. It has worked in over 30 countries in activities related to the operation and maintenance of nuclear power plants. Along this half century of history. Tecnatom has been providing its services to nuclear utilities, regulators, NPP vendors, NPP owners / operators and nuclear fuel manufacturers not only in Spain but also abroad. It started to work in the design of new nuclear power plants in the early 90 s and since then has continued collaborating with different suppliers in the design and licensing of new reactors especially in the areas of plant systems design, man-machine interface design, main control room simulators building, training, qualification of equipment and PSI/ISI engineering services. Some challenges to the reactivation of nuclear power plants construction are common worldwide, including: regulatory processes, workforce availability, construction project management, etc. Being some keys to success the following: apply qualified resources, enough resources for early planning, project leadership, organization and integration, establish a strong integrated management team. The goal of this paper is to inform regarding the capabilities of Tecnatom in the construction of new power plants. (Author)

  11. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  12. A basic framework for managing time of nuclear plant projects

    International Nuclear Information System (INIS)

    Beck, J.R.

    1987-01-01

    One of the crucial problems that faces managers of nuclear power plant projects is how to obtain more effective and efficient utilization of their company's resources. Analysis of this problem showed that improvement was necessary in the time management area. Time management is one of the primary functions of project groups. Much has been written about planning and scheduling, and there are many modern techniques (CPM, PERT, etc.) available to a project group to manage time. So, why is time management still a problem? One reason is that nuclear projects are generally very complex and involve many organizations requiring the same resources. It is the intent of this paper to present a comprehensive and basic framework on which to either build a time management system or use as a basis to assess an existing system

  13. Simulation-based valuation of project finance investments. Crucial aspects of power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Pietz, Matthaeus

    2010-12-15

    The liberalization of electricity markets transformed a regulated and stable market to a market with former unknown price volatility. This results in a high uncertainty which is mainly due to the, from an economic point of view, lack of storability of the commodity electricity. Thus investments in power plants are highly risky. This dissertation analyzes crucial aspects within the valuation of a power plant financed via project finance, a popular financing method for projects with high capital requirements. Starting with the development of a valuation model based on stochastic modelling of the future cash flows the focus of the analysis is on the impact of model complexity and electricity prices. (orig.)

  14. Large scale PV plants - also in Denmark. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Ahm, P [PA Energy, Malling (Denmark); Vedde, J [SiCon. Silicon and PV consulting, Birkeroed (Denmark)

    2011-04-15

    Large scale PV (LPV) plants, plants with a capacity of more than 200 kW, has since 2007 constituted an increasing share of the global PV installations. In 2009 large scale PV plants with cumulative power more that 1,3 GWp were connected to the grid. The necessary design data for LPV plants in Denmark are available or can be found, although irradiance data could be improved. There seems to be very few institutional barriers for LPV projects, but as so far no real LPV projects have been processed, these findings have to be regarded as preliminary. The fast growing number of very large scale solar thermal plants for district heating applications supports these findings. It has further been investigated, how to optimize the lay-out of LPV plants. Under the Danish irradiance conditions with several winter months with very low solar height PV installations on flat surfaces will have to balance the requirements of physical space - and cost, and the loss of electricity production due to shadowing effects. The potential for LPV plants in Denmark are found in three main categories: PV installations on flat roof of large commercial buildings, PV installations on other large scale infrastructure such as noise barriers and ground mounted PV installations. The technical potential for all three categories is found to be significant and in the range of 50 - 250 km2. In terms of energy harvest PV plants will under Danish conditions exhibit an overall efficiency of about 10 % in conversion of the energy content of the light compared to about 0,3 % for biomass. The theoretical ground area needed to produce the present annual electricity consumption of Denmark at 33-35 TWh is about 300 km2 The Danish grid codes and the electricity safety regulations mention very little about PV and nothing about LPV plants. It is expected that LPV plants will be treated similarly to big wind turbines. A number of LPV plant scenarios have been investigated in detail based on real commercial offers and

  15. Emotions while awaiting lung transplantation: A comprehensive qualitative analysis

    Science.gov (United States)

    Brügger, Aurelia; Aubert, John-David

    2014-01-01

    Patients awaiting lung transplantation are at risk of negative emotional and physical experiences. How do they talk about emotions? Semi-structured interviews were performed (15 patients). Categorical analysis focusing on emotion-related descriptions was organized into positive–negative–neutral descriptions: for primary and secondary emotions, evaluation processes, coping strategies, personal characteristics, emotion descriptions associated with physical states, (and) contexts were listed. Patients develop different strategies to maintain positive identity and attitude, while preserving significant others from extra emotional load. Results are discussed within various theoretical and research backgrounds, in emphasizing their importance in the definition of emotional support starting from the patient’s perspective. PMID:28070345

  16. Emotions while awaiting lung transplantation: A comprehensive qualitative analysis.

    Science.gov (United States)

    Brügger, Aurelia; Aubert, John-David; Piot-Ziegler, Chantal

    2014-07-01

    Patients awaiting lung transplantation are at risk of negative emotional and physical experiences. How do they talk about emotions? Semi-structured interviews were performed (15 patients). Categorical analysis focusing on emotion-related descriptions was organized into positive-negative-neutral descriptions: for primary and secondary emotions, evaluation processes, coping strategies, personal characteristics, emotion descriptions associated with physical states, (and) contexts were listed. Patients develop different strategies to maintain positive identity and attitude, while preserving significant others from extra emotional load. Results are discussed within various theoretical and research backgrounds, in emphasizing their importance in the definition of emotional support starting from the patient's perspective.

  17. Emotions while awaiting lung transplantation: A comprehensive qualitative analysis

    Directory of Open Access Journals (Sweden)

    Aurelia Brügger

    2014-12-01

    Full Text Available Patients awaiting lung transplantation are at risk of negative emotional and physical experiences. How do they talk about emotions? Semi-structured interviews were performed (15 patients. Categorical analysis focusing on emotion-related descriptions was organized into positive–negative–neutral descriptions: for primary and secondary emotions, evaluation processes, coping strategies, personal characteristics, emotion descriptions associated with physical states, (and contexts were listed. Patients develop different strategies to maintain positive identity and attitude, while preserving significant others from extra emotional load. Results are discussed within various theoretical and research backgrounds, in emphasizing their importance in the definition of emotional support starting from the patient’s perspective.

  18. Hanford Waste Vitrification Plant - the project and process systems

    International Nuclear Information System (INIS)

    Swenson, L.D.; Miller, W.C.; Smith, R.A.

    1990-01-01

    The Hanford Waste Vitrification Plant (HWVP) project is scheduled to start construction on the Hanford reservation in southeastern Washington State in 1991. The project will immobilize the liquid high-level defense waste stored there. The HWVP represents the third phase of the U.S. Department of Energy (DOE) activities that are focused on the permanent disposal of high-level radioactive waste, building on the experience of Defense Waste Processing Facility (DWPF) at the Savannah River site, South Carolina, and of the West Valley Demonstration Plant (WVDP), New York. This sequential approach to disposal of the country's commercial and defense high-level radioactive waste allows HWVP to make extensive use of lessons learned from the experience of its predecessors, using mature designs from the earlier facilities to achieve economies in design and construction costs while enhancing operational effectiveness

  19. South Ukraine Nuclear Power Plant. Advanced Computer Information System Project

    International Nuclear Information System (INIS)

    Hord, J.; Afanasiev, N.; Smith, C.; Kudinov, Yu.

    1997-01-01

    The South Ukraine upgrade is the first of many that will take place in the former eastern bloc countries over the next several years. Westron is currently developing a similar system for the Zaporozhe nuclear power plant. In addition, there are eleven other WWER type units in operation in the Ukraine, as well as twenty seven others in operation throughout Eastern and Central Europe and Russia - all potential upgrade projects. (author)

  20. Quality management in an international nuclear power plant project

    International Nuclear Information System (INIS)

    Brion, J.; Crustin, J.

    1975-01-01

    SNR (Schneller Natriumgekuehlter Reaktor) is the fast reactor power plant being erected at Kalkar, Federal German Republic. Quality management in this project is a contractual obligation. Quality management is subdivided into quality engineering, set of actions performed before manufacturing, and quality control, set of material controls performed during fabrication. The two successive phases of the quality management are presented. The difficulties and improvment possibilities are discussed [fr

  1. Bid Preparation and Evaluation for Nuclear Power Plant Project Management

    International Nuclear Information System (INIS)

    Mohd Idris Taib, Mohd Khairulezwan Abdul Manan and Nur Farizan Amadzun

    2011-01-01

    Bid preparation and evaluation is one of the main activities in Nuclear Power Plant Project management. International Atomic Energy Agency guide and Korean experience was studied for Malaysian requirement in realization of first Nuclear Power Plant. Several aspects shall be taken into consideration such as political scenario, financial capabilities, sitting, human resource, technologies, fuel supplies and decommissioning for long term exceeded hundred years. Bidding process and activities is proposed for our country requirement. The main activities included but unlimited to Bid Invitation Specification, Bid Evaluation Process, Technical Evaluation, Economic Bid Evaluation and Contracting. On the end of day, Malaysia need safe and reliable Nuclear Power Plant. Malaysian Economic Transformation Programme also get benefit from spin-off localization products and services as well as Technology Transfer Programme. (author)

  2. Plant life management in Belgium: an integrated project

    International Nuclear Information System (INIS)

    Wacquier, W.; Smet, M. de; Hennart, J.C.; Greer, J.L.; Breesch, Ch.; Havard, P.

    2001-01-01

    In Belgium, a specific plant life management project, named ''Continuous Operation of Belgian NPPs'' is currently developing. Its final objective is to centralize all safety and economic aspects of plant life management in order to determine, for each NPP unit, the optimal actions required to maintain their safe and reliable operation. As the lifetime of safety-related active components is permanently controlled by the current maintenance programs, the project focuses only on passive safety-related components and on non-safety components important for the availability of the plants. These structures and components were evaluated and compared on the basis of a set of weighted criteria in order to measure their criticality and to identify those which must be considered in the project. The selection and the ranking of those components is based on the KBM TM methodology (Knowledge Based Maintenance). This methodology facilitates the collection, formalization and exchange of know-how and gives immediate results thanks to a sequential and systematic step by step analysis. (author)

  3. Angra 1 nuclear power plant full scope simulator development project

    Energy Technology Data Exchange (ETDEWEB)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da, E-mail: edsel@eletronuclear.gov.br, E-mail: lccast@eletronuclear.gov.br, E-mail: nilogar@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (SCO/ELETRONUCLEAR), Angra dos Reis, RJ (Brazil). Superintendencia de Coordenacao da Operacao; Zazo, Francisco Javier Lopez; Ruiz, Jose Antonio, E-mail: jlopez@tecnatom.es, E-mail: jaruiz@tecnatom.es [Tecnatom S.A., San Sebastian de los Reyes, Madrid (Spain)

    2015-07-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  4. Angra 1 nuclear power plant full scope simulator development project

    International Nuclear Information System (INIS)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da

    2015-01-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  5. Assessing bone status in patients awaiting liver transplantation.

    Science.gov (United States)

    Wibaux, Cécile; Legroux-Gerot, Isabelle; Dharancy, Sébastien; Boleslawski, Emmanuel; Declerck, Nicole; Canva, Valérie; Mathurin, Philippe; Pruvot, François-René; Cortet, Bernard

    2011-07-01

    Osteoporosis is common in liver transplant recipients as a result of both iatrogenic factors and preexisting hepatic osteodystrophy. To assess the prevalences of osteoporosis and fractures and to identify risk factors for these two abnormalities in patients awaiting liver transplantation for end-stage liver disease. Between January 2006 and December 2007, patients on a liver transplant waiting list underwent a routine evaluation comprising the identification of risk factors for osteoporosis, radiographs of the spine, bone mineral density measurements (BMD), and laboratory tests (phosphate and calcium levels, hormone assays, liver function tests, and bone turnover markers). We studied 99 patients (70 males and 20 females; mean age, 55 ± 8 years) including 75% with alcohol-induced cirrhosis with or without hepatocarcinoma. Among them, 36% had radiographic vertebral fractures, 38% had osteoporosis, 35% had osteopenia, and 88% had vitamin D insufficiency or deficiency (25(OH)vitamin D3bone resorption markers correlated negatively with BMD at the spine and hip. The Model for End-Stage Liver Disease score correlated negatively with hip BMD. Our findings suggest high prevalences of low BMD values and vertebral fractures among patients awaiting liver transplantation. Bone status should be evaluated routinely in candidates to liver transplantation. Copyright © 2011 Société française de rhumatologie. Published by Elsevier SAS. All rights reserved.

  6. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  7. Projecting the success of plant restoration with population viability analysis

    Science.gov (United States)

    Bell, T.J.; Bowles, M.L.; McEachern, A.K.; Brigham, C.A.; Schwartz, M.W.

    2003-01-01

    Conserving viable populations of plant species requires that they have high probabilities of long-term persistence within natural habitats, such as a chance of extinction in 100 years of less than 5% (Menges 1991, 1998; Brown 1994; Pavlik 1994; Chap. 1, this Vol.). For endangered and threatened species that have been severely reduces in range and whose habitats have been fragmented, important species conservation strategies may include augmenting existing populations or restoring new viable populations (Bowles and Whelan 1994; Chap. 2, this Vol.). Restoration objectives may include increasing population numbers to reduce extinction probability, deterministic manipulations to develop a staged cohort structure, or more complex restoration of a desired genetic structure to allow outcrossing or increase effective population size (DeMauro 1993, 1994; Bowles et al. 1993, 1998; Pavlik 1994; Knapp and Dyer 1998; Chap. 2, this Vol.). These efforts may require translocation of propagules from existing (in situ) populations, or from ex situ botanic gardens or seed storage facilities (Falk et al. 1996; Guerrant and Pavlik 1998; Chap. 2, this Vol.). Population viability analysis (PVA) can provide a critical foundation for plant restoration, as it models demographic projections used to evaluate the probability of population persistence and links plant life history with restoration strategies. It is unknown how well artificially created populations will meet demographic modeling requirements (e.g., due to artificial cohort transitions) and few, if any, PVAs have been applied to restorations. To guide application of PVA to restored populations and to illustrate potential difficulties, we examine effects of planting different life stages, model initial population sizes needed to achieve population viability, and compare demographic characteristics between natural and restored populations. We develop and compare plant population restoration viability analysis (PRVA) case studies of

  8. Elusive prize: enormous coal gas potential awaits production technology breakthrough

    Energy Technology Data Exchange (ETDEWEB)

    Collison, M.

    2002-01-07

    The expanded gas pipeline grid has excess capacity, and gas resources are declining. There is increasing interest in development of Canada's resources of coalbed methane (CBM). The chairman of the Canadian Coalbed Methane Forum estimates that Canada has more than 3,000 trillion ft{sup 3} of gas awaiting suitable technology. PanCanadian and MGV Energy conducted a CBM exploration and pilot study on the Palliser spread in southern Alberta. Results from 23 of 75 wells are encouraging. The study is being accelerated and expanded to include an additional 50 wells elsewhere in Alberta. Some scientists anticipate commercial CBM production within two years. Problems facing developers include the large land holdings necessary for economic CBM production and the disposal of coal formation water. It is anticipated that U.S. technology will be modified and used. The potential for CBM development at Pictou in Nova Scotia and in British Columbia in the foothills is considered. 3 figs.

  9. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  10. Projected uranium measurement uncertainties for the Gas Centrifuge Enrichment Plant

    International Nuclear Information System (INIS)

    Younkin, J.M.

    1979-02-01

    An analysis was made of the uncertainties associated with the measurements of the declared uranium streams in the Portsmouth Gas Centrifuge Enrichment Plant (GCEP). The total uncertainty for the GCEP is projected to be from 54 to 108 kg 235 U/year out of a measured total of 200,000 kg 235 U/year. The systematic component of uncertainty of the UF 6 streams is the largest and the dominant contributor to the total uncertainty. A possible scheme for reducing the total uncertainty is given

  11. Defense waste processing facility project at the Savannah River Plant

    International Nuclear Information System (INIS)

    Baxter, R.G.; Maher, R.; Mellen, J.B.; Shafranek, L.F.; Stevens, W.R. III.

    1984-01-01

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level waste at the Savannah River Plant near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes produced by defense activities at the site. At the present time engineering and design are 45% complete, the site has been cleared, and startup is expected in 1989. This paper will describe project status as well as features of the design. 9 figures

  12. Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan

    International Nuclear Information System (INIS)

    Randklev, E.H.

    1993-06-01

    The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented

  13. Plutonium Finishing Plant Transition Project mission analysis report

    International Nuclear Information System (INIS)

    Courson, D.B.

    1994-01-01

    This report defines the mission for the Plutonium Finishing Plant Transition Project (PFPTP) using a systems engineering approach. This mission analysis will be the basis for the functional analysis which will further define and break down the mission statement into all of the detailed functions required to accomplish the mission. The functional analysis is then used to develop requirements, allocate those requirements to functions, and eventually be used to design the system. This report: presents the problem which will be addressed, defines PFP Transition Project, defines the overall mission statement, describes the existing, initial conditions, defines the desired, final conditions, identifies the mission boundaries and external interfaces, identifies the resources required to carry out the mission, describes the uncertainties and risks, and discusses the measures which will be used to determine success

  14. Completion of Belene Nuclear Power Plant: Project perspectives

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2006-01-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  15. National project : advanced robot for nuclear power plant

    International Nuclear Information System (INIS)

    Tsunemi, T.; Takehara, K.; Hayashi, T.; Okano, H.; Sugiyama, S.

    1993-01-01

    The national project 'Advanced Robot' has been promoted by the Agency of Industrial science and Technology, MITI for eight years since 1983. The robot for a nuclear plant is one of the projects, and is a prototype intelligent one that also has a three dimensional vision system to generate an environmental model, a quadrupedal walking mechanism to work on stairs and four fingered manipulators to disassemble a valve with a hand tool. Many basic technologies such as an actuator, a tactile sensor, autonomous control and so on progress to high level. The prototype robot succeeded functionally in official demonstration in 1990. More refining such as downsizing and higher intelligence is necessary to realize a commercial robot, while basic technologies are useful to improve conventional robots and systems. This paper presents application studies on the advanced robot technologies. (author)

  16. Completion of Belene Nuclear Power Plant: Project perspectives

    Energy Technology Data Exchange (ETDEWEB)

    Bogdanov, D. [Risk Engineering Ltd., CREFID, 34 Totleben Blvd., Sofia 1606 (Bulgaria)]. E-mail: bogdanov@riskeng.bg

    2006-07-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  17. Project approach study for nuclear power plants in the Netherlands

    International Nuclear Information System (INIS)

    1985-11-01

    The new nuclear program in the Netherlands comprises the construction of two to four nuclear power plants up to the year 2000. The main objective pursued with the implementation of the nuclear program is the supply of low-cost electricity in the future. In order to prepare the program and to provide a basis for further decisions, the Ministry of Economic Affairs has entrusted Motor-Columbus Consulting Engineers Inc., Baden, Switzerland, with a study to determine the most suitable project approach option(s) for the implementation of the future nuclear program in the Netherlands. In carrying out this study, Motor-Columbus investigated the following main project approach options: 1. turnkey contract approach; 2. split-package contract approach; 3. multi-contract approach. It is concluded that if applied in the appropriate way, the normal turnkey contract approach represents the most suitable approach under the prevailing situation in the Netherlands. (orig.)

  18. Financing Nuclear Power Plant Projects. A New Paradigm?

    International Nuclear Information System (INIS)

    Pehuet Lucet, Fabienne

    2015-05-01

    There are currently 435 operable nuclear power reactors around the world, with a further 71 under construction. Two main proven financing models were applied to nuclear plants in the past: the national model, and the corporate model. The historical model of financing is the national model. It allowed for the most efficient risk allocation model in then-regulated national electricity markets: government or state-owned utilities with government guarantee assumed the risks of building nuclear power plants locally. The national model has proven to be efficient in France, Russia and the USA where it was modified to support private business initiatives. It was then replicated in Japan, Korea and China where significant nuclear programs were developed. In the corporate business model, the owner of the plant assumes most of the risk, but various schemes are used to mitigate the owner's risk by transmitting large areas of risks to others: vendors for construction risk as in Finland, government through loans guarantees etc. As projects became international, a set of common principles were approved by OECD countries concerning financing and the role of Export Credit Agencies. The objective was to provide competition rules whereby exporters compete on the basis of the price and quality of their products rather than the financial terms provided. Various combinations of these models were and still are implemented. Pure Project Finance was not implemented for nuclear power plants, but the model nurtures reflections about new financing models. The context in which nuclear power projects are now decided and financed changed drastically: it is a new paradigm. Risk allocation and financial conditions are at the forefront of competition to win new nuclear projects' tenders insofar as reducing uncertainties is a decisive competition edge. In a context of electricity market deregulation and high construction risks, investors and lenders require more and more securities to

  19. Compost plant of Medellin - An economically viable project

    International Nuclear Information System (INIS)

    Bedoya V, Julian; Arango M, Carlos Andres

    1999-01-01

    The solid waste treatment facility of Empresas Varias de Medellln started operation of the 70's. The total investment in equipment and construction by 1971 was of about $ 36'000. 000 Colombian pesos, that by 1997 was valued at more than seven thousand million pesos $7.000'000. 000). The solid waste treatment facility was able to process 180 t/day, generating compost and recyclable by products (textile fibbers. paper, cardboard, glass, plastics, scrap metals) with commercial value. Operating expenses for the facility in 1972 were $2'187.742 to process 53.300 t/year in 296 working days. Revenues from compost and recyclable by products were $ 8 '791.280, with a positive balance of $ 6 '603.538. For those years debt annual payments were $ 3'919.372, giving a yearly profit of $ 2'684.165. Instead of debt payments a yearly charge of $ 7 '315. 240 can be made to account for equipment and construction costs; in addition land rent of $ 500000 per year should be charged to the plant. in this case the operational loss is of $ 1' 397.663 ($ 26/ t) that has to be covered by solid waste service charges. Under these conditions the project is not economically feasible, especially if taking solid wastes to Moravia has not cost at all. Twenty-five years later situation is different: transportation and final disposal costs in Curva de Rodas amount to more than $ 19. 000/t. expected total revenues for a similar project in 1997 could be $2.778' 000.000 and operational expenses for 365 days are estimated at $ 506' 000.000; yearly annual cost for construction and equipment amounts to $1. 411' 000.000 and land rental of $96'000.000 give a profit of close to $765 '000.000. Under these conditions the project is economically feasible and generates a profit: it may be even more attractive if the solid waste company pays a disposal fee, since it is saving room in Curva de Rodas. In order to obtain fully feasibility of the project requires: compost must be improved and positioned in the market

  20. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  1. Feasibility study for Tashkent Heat and Power Plant Modernizing Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was carried out of the project for energy conservation and greenhouse effect gas emission reduction by introducing the newest and most powerful gas turbine cogeneration facilities to the Tashkent cogeneration plant in Uzbekistan. At the Tashkent cogeneration plant, each of the facilities is being superannuated, which leads to lowering of operational reliability and increase in cost of repairs. In the project, studied was the introduction of the newest and most powerful gas turbine cogeneration facilities with heat output of 100 Gcal/h equivalent to that of one can of the existing hot water boiler and with generated output of 80MW. As a result of the study, obtained were the energy conservation amount of 83.9 ktoe/y and the greenhouse effect gas reduction amount of 179.7 kt-CO2/y. The initial investment amount was 10.003 billion yen. Expenses vs. effects were 8.39 toe/y-million yen in energy conservation amount and 18.0 t-CO2/y-million yen in greenhouse effect gas reduction amount. In the study of profitability, the internal earning rate was 9.24% after tax, the return yield of capital was 41.26%, and the period of ROI was 16.9 years. (NEDO)

  2. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  3. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  4. Data base on nuclear power plant dose reduction research projects

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Baum, J.W.

    1986-10-01

    Staff at the ALARA Center of Brookhaven National Laboratory have established a data base of information about current research that is likely to result in lower radiation doses to workers. The data base, concerned primarily with nuclear power generation, is part of a project that the ALARA Center is carrying out for the Nuclear Regulatory Commission. This report describes its current status. A substantial amount of research on reducing occupational exposure is being done in the US and abroad. This research is beginning to have an impact on the collective dose expenditures at nuclear power plants. The collective radiation doses in Europe, Japan, and North America all show downward trends. A large part of the research in the US is either sponsored by the nuclear industry through joint industry organizations such as EPRI and ESEERCO or is done by individual corporations. There is also significant participation by smaller companies. The main emphasis of the research on dose reduction is on engineering approaches aimed at reducing radiation fields or keeping people out of high-exposure areas by using robotics. Effective ALARA programs are also underway at a large number of nuclear plants. Additional attention should be given to non-engineering approaches to dose reduction, which are potentially very useful and cost effective but require quantitative study and analysis based on data from nuclear power plants. 9 refs., 1 fig.

  5. Nevada Renewable Energy Training Project: Geothermal Power Plant Operators

    Energy Technology Data Exchange (ETDEWEB)

    Jim, Nichols [Truckee Meadows Community College, Reno, NV (United States)

    2014-04-29

    The purpose of this project was to develop and institute a training program for certified geothermal power plant operators (GPO). An advisory board consisting of subject matter experts from the geothermal energy industry and academia identified the critical skill sets required for this profession. A 34-credit Certificate of Achievement (COA), Geothermal Power Plant Operator, was developed using eight existing courses and developing five new courses. Approval from the Nevada System of Higher Education Board of Regents was obtained. A 2,400 sq. ft. geothermal/fluid mechanics laboratory and a 3,000 sq. ft. outdoor demonstration laboratory were constructed for hands-on training. Students also participated in field trips to geothermal power plants in the region. The majority of students were able to complete the program in 2-3 semesters, depending on their level of math proficiency. Additionally the COA allowed students to continue to an Associate of Applied Science (AAS), Energy Technologies with an emphasis in Geothermal Energy (26 additional credits), if they desired. The COA and AAS are stackable degrees, which provide students with an ongoing career pathway. Articulation agreements with other NSHE institutions provide students with additional opportunities to pursue a Bachelor of Applied Science in Management or Instrumentation. Job placement for COA graduates has been excellent.

  6. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  7. Completion of Mochovce 1 and 2 nuclear power plant project

    International Nuclear Information System (INIS)

    Valach, J.

    2000-01-01

    Commissioning of the Mochovce Nuclear Power Plant unit 2 fully completed the Mochovce unit 1 and 2 project. The power plant construction passed through a complicated evolution since early 80's. The genesis started with the change of the plant location due to a seismic resistance requirement raised by the former Czechoslovak Atomic Energy Commission, change of the design and contractor of the Instrumentation and Control system in early 90's, halt of construction in 1993 till 1996 due to a lack of funding, as well as a series of international reviews of safety aspects. All the obstacles had been overcome in the end, and completion works were re-started in 1996. Looking back to the unit 1 and 2 completion project, I would like to highlight some aspects of the project, particularly the level of safety, technical and organisational conditions, and terms of funding. The most important argument for completion of the plant was that VVER 440/213 reactor units were distinguished with very high level of passive safety, even overcoming Western-type PWR's in some aspects. The replacement of the original I and C system was another important contribution to the initial level of safety. International safety reviews performed at Mochovce NPP between 1990 and 1995 (Siemens, EdF, IAEA, RlSKAUDIT) confirmed the high level of safety of VVER 440/213 reactors, however, pointed out at some safety issues which had not been dealt with in the design. Those included e.g. the 'external risks', primary-to-secondary leaks, qualification of pressurizer safety valves, and others. It is necessary to stress that the Safety Improvement Programme defined for Mochovce NPP to comply with international standards did not become the most important part of the completion project due to external pressures, but based on natural requirements on nuclear power plant safety level generally accepted in 90's. The good example could be the seismic resistance of the plant which, though designed as seismic resistant

  8. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  9. Geothermal project will predetermine future of the Kosice heating plant

    International Nuclear Information System (INIS)

    Hirman, K.

    2003-01-01

    Geoterm, a.s. manager O. Halas describes economic and technical parameters of geothermal energy source by village Durkov near Kosice. It is planned to exploitate geothermal energy source for Kosicka heating plant (TEKO). Three basic variants of technical connecting to geothermal source are developed. Temperature at TEKO entrance should reach 125 degrees, annual heating energy supply will reach 2100 TJ and source output will reach 100 MWt, while admissible deviation at all indicators reaches 10%. The first geothermal energy should by supplied to TEKO in 2007. The investments overlapping 3 billions Slovak crowns are necessary to realize whole project. According to O. Halas a credit from World Bank guaranteed by state is crucial

  10. Fuel Cell Balance-of-Plant Reliability Testbed Project

    Energy Technology Data Exchange (ETDEWEB)

    Sproat, Vern [Stark State College of Technology, North Canton, OH (United States); LaHurd, Debbie [Lockheed Martin Corp., Oak Ridge, TN (United States)

    2016-10-29

    Reliability of the fuel cell system balance-of-plant (BoP) components is a critical factor that needs to be addressed prior to fuel cells becoming fully commercialized. Failure or performance degradation of BoP components has been identified as a life-limiting factor in fuel cell systems.1 The goal of this project is to develop a series of test beds that will test system components such as pumps, valves, sensors, fittings, etc., under operating conditions anticipated in real Polymer Electrolyte Membrane (PEM) fuel cell systems. Results will be made generally available to begin removing reliability as a roadblock to the growth of the PEM fuel cell industry. Stark State College students participating in the project, in conjunction with their coursework, have been exposed to technical knowledge and training in the handling and maintenance of hydrogen, fuel cells and system components as well as component failure modes and mechanisms. Three test beds were constructed. Testing was completed on gas flow pumps, tubing, and pressure and temperature sensors and valves.

  11. Technical Description Lillgrund Wind Power Plant. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Jeppsson, Joakim; Larsen, Poul Erik; Larsson, Aake [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2008-09-15

    Lillgrund offshore wind power plant comprises 48 wind turbines, each rated at 2.3 MW, bringing the total wind farm capacity to 110 MW. The Lillgrund offshore wind power plant is located in a shallow area of Oeresund, 7 km off the coast of Sweden and 7 km south from the Oeresund Bridge connecting Sweden and Denmark. An average wind speed of around 8,5 m/s at hub height, combined with a relatively low water depth of 4 to 8 meters makes it economically feasible to build here. Vattenfall Vindkraft AB is the owner and operator of Lillgrund offshore wind power plant. Lillgrund is a Swedish pilot project supported by the Swedish Energy Agency. The bidding process was completed during 2005 and the offshore power plant was constructed in the period 2006 to 2007. The wind farm was constructed on time and has now been successfully operational since December 2007. There is, however, always potential for improvement and the aim of this report has been to determine and highlight these areas. It is worth noting out that only the electrical system and the foundations are tailor made at offshore wind power plants. The wind turbines are more or less standard products with none or very limited possibilities for project specific design changes. Geotechnical investigations are expensive and it can be difficult to balance the risks as well as the benefits of this expense in the early phases of a large infrastructure project. As a whole, the geotechnical surveys at Lillgrund proved to be useful. They identified potential issues, such as the fact that extra excavation was required for two of the foundations. It also revealed the location of a small number of boulders that would have to be removed. Vattenfall requested a complete study of the electrical system for Lillgrund to be delivered with the bids. That request was not met. Instead Siemens Wind Power began a complete electrical system study after being awarded the Contract. The electrical system study was completed during the

  12. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  13. The Psychological Impact of Awaiting Breast Diagnosis: A Preliminary Picture

    Science.gov (United States)

    Dr. Sweeny is a social psychologist by training, but she applies the theories and methods of social psychology to address patients' experiences with their health and healthcare. Over the years, her work has examined topics ranging from bad news delivery to physician-patient communication to screening decisions. Her current research program focuses on the stressful but understudied experience of awaiting uncertain news, including news about one's health. She developed the uncertainty navigation model as a theoretical framework for understanding the thoughts, feelings, and behaviors that emerge during the wait for health-relevant news. Her work has provided broad and novel insights into this difficult experience, including how waiting experiences unfold over time, the nature of distress during waiting periods, the relative effectiveness of various strategies people can use to cope with uncertainty, and the implications of stressful waiting periods for sleep and health. Dr. Sweeny’s work has been funded by the National Science Foundation and published in top journals, including Annals of Behavioral Medicine, Health Psychology Review, Journal of Personality & Social Psychology, Psychological Bulletin, and Psychological Science. She received the inaugural Early Career Award from the Social Personality Health Network, and in 2016 she was awarded the APA Distinguished Scientific Award for an Early Career Contribution to Health Psychology. In her other life, Dr. Sweeny is a Middle Eastern dance performer and instructor, a yoga enthusiast, and an avid hiker. If you are a person with a disability and require an assistive device, services or other reasonable accommodations to participate in this activity, please contact the Cancer Prevention Fellowship Program at (240) 276-5626 at least one week in advance of the lecture date to discuss your accommodation needs.

  14. Summary of EPRI projects for improving power plant maintenance and maintainability

    International Nuclear Information System (INIS)

    Shugars, H.G.; Poole, D.N.; Pack, R.W.

    1979-01-01

    The Electric Power Research Institute is sponsoring projects to improve power plant maintenance and maintainability. Areas presently being emphasized are improvements in plant design for maintainability, improvements in performing nuclear plant refuelings, and development of on-line monitoring and diagnostic systems for various plant components. The seven projects are reviewed. They are: (1) human factors review of power plant maintainability; (2) refueling outage improvement; (3) on-line monitoring and diagnostics for power plant machinery; (4) acoustic emission and vibrati1on signature analysis of fossil fuel plant components; (5) acoustic monitoring of power plant valves; (6) on-line monitoring and diagnostics for generators; and (7) detection of water induction in steam turbines. Each project contractor and the project manager are listed for reference. 8 references

  15. Project plan for the background soils project for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Background Soils Project for the Paducah Gaseous Diffusion Plant (BSPP) will determine the background concentration levels of selected naturally occurring metals, other inorganics, and radionuclides in soils from uncontaminated areas in proximity to the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The data will be used for comparison with characterization and compliance data for soils, with significant differences being indicative of contamination. All data collected as part of this project will be in addition to other background databases established for the PGDP. The BSPP will address the variability of surface and near-surface concentration levels with respect to (1) soil taxonomical types (series) and (2) soil sampling depths within a specific soil profile. The BSPP will also address the variability of concentration levels in deeper geologic formations by collecting samples of geologic materials. The BSPP will establish a database, with recommendations on how to use the data for contaminated site assessment, and provide data to estimate the potential human and health and ecological risk associated with background level concentrations of potentially hazardous constituents. BSPP data will be used or applied as follows.

  16. Project plan for the background soils project for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    International Nuclear Information System (INIS)

    1995-09-01

    The Background Soils Project for the Paducah Gaseous Diffusion Plant (BSPP) will determine the background concentration levels of selected naturally occurring metals, other inorganics, and radionuclides in soils from uncontaminated areas in proximity to the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The data will be used for comparison with characterization and compliance data for soils, with significant differences being indicative of contamination. All data collected as part of this project will be in addition to other background databases established for the PGDP. The BSPP will address the variability of surface and near-surface concentration levels with respect to (1) soil taxonomical types (series) and (2) soil sampling depths within a specific soil profile. The BSPP will also address the variability of concentration levels in deeper geologic formations by collecting samples of geologic materials. The BSPP will establish a database, with recommendations on how to use the data for contaminated site assessment, and provide data to estimate the potential human and health and ecological risk associated with background level concentrations of potentially hazardous constituents. BSPP data will be used or applied as follows

  17. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Demick, L.E.

    2011-01-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  18. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  19. Expanded spent fuel storage project at Yankee Atomic Electric Plant

    International Nuclear Information System (INIS)

    Chin, S.L.

    1980-01-01

    A detailed discussion on the project at the Yankee Rowe power reactor for expanding the capacity of the at-reactor storage pool by building double-tier storage racks. Various alternatives for providing additional capacity were examined by the operators. Away-from-reactor alternatives included shipment to existing privately owned facilities, a regional independent storage facility, and transshipments to other New England nuclear power plant pools. At-reactor alternatives evaluated included a new pool modification of the existing structure and finally, modification of the spent fuel pit. The establishment of a federal policy precluding transshipment of spent fuel prohibited the use of off-site alternatives. The addition of another pool was too expensive. The possibility of modifying an existing on-site structure required a new safety evaluation by the regulatory group with significant cost and time delays. Therefore, the final alternative - utilizing the existing spent fuel pool with some modification - was chosen due to cost, licensing possibility, no transport requirements, and the fact that the factors involved were mainly under the control of the operator. Modification of the pool was accomplished in phases. In the first phase, a dam was installed in the center of the pool (after the spent fuel was moved to one end). In the second phase, the empty end of the pool was drained and lined with stainless steel and the double-tier rack supports were added. In the third phase, the pool was refilled and the dam was removed. Then the spent fuel was moved into the completed end. In the fourth phase, the dam was replaced and the empty part of the pool was drained. The liner and double-tier rack supports were installed, the pool was refilled, and the dam was removed.The project demonstrated that the modification of existing spent fuel fuel pools for handling double-tier fuel racks is a viable solution for increasing the storage capacity at the reactor

  20. SRT project: tele-robotics maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Gomez-Santamaria, J.; Calleja, J.M.; Carmena, P.; Avello, A.; Rubio, Y.A.

    2001-01-01

    The main aim of the SRT project was to develop a family of robots to help in the operation of nuclear power plants. Four robotic systems were developed and this paper focuses on three of them: ANAES -a steam leak detector through noise analysis-, MALIBA -a master-slave tele-operation system with force feedback- and ROBICEN -a compact pneumatic wall climbing robot-. ANAES (the Spanish acronym of spectrum analysis) consists of a set of sensor heads attached to a computer. Each head has two microphones and a video camera installed on it, and a DC motor that rotates the head. The heads are shielded with lead and boron steel, especially near the video camera. The noise generated by the plant is recorded every day at the same time and the software compares the recorded noise with the mean values of past records. The system can discern whether the noise has remarkably changed and, through phase analysis of the sound recorded by both microphones, identifies the direction of arrival (DOA) of the new noise, probably a steam leak. Using several heads, the new noise source can be identified. The video camera can be used to ease the location of the steam leaks. The stationariness of the measured noise has been tested in C.N. Cofrentes -a Spanish BWR-6 reactor-. A finished system with six heads has recently been installed in the MSR (moisture separator reheater) of the same plant. MALIBA is a master-slave tele-operated system with force feedback. It consists of two robots: a Stewart platform used as master robot and an open chain robot used as slave. The slave robot follows faithfully the movements of the master, and the master robot can reflect a force proportional to the force exerted by the slave on the environment. Three tools have been developed for the slave robot: a robot hand that includes a small video camera, a pneumatic drill and a rectifier. The results obtained have shown its effectiveness for the designed operations. ROBICEN is a lightweight pneumatic robot

  1. SRT project: tele-robotics maintenance of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Gomez-Santamaria, J. [Iberdrola SA, Madrid (Spain); Calleja, J.M.; Carmena, P. [Endesa, Madrid (Spain); Avello, A.; Rubio, Y.A. [CEIT-Centro de Estudias e Investigaciones Tecnicas de Guipuzcoa, San Sebastian (Spain)

    2001-07-01

    The main aim of the SRT project was to develop a family of robots to help in the operation of nuclear power plants. Four robotic systems were developed and this paper focuses on three of them: ANAES -a steam leak detector through noise analysis-, MALIBA -a master-slave tele-operation system with force feedback- and ROBICEN -a compact pneumatic wall climbing robot-. ANAES (the Spanish acronym of spectrum analysis) consists of a set of sensor heads attached to a computer. Each head has two microphones and a video camera installed on it, and a DC motor that rotates the head. The heads are shielded with lead and boron steel, especially near the video camera. The noise generated by the plant is recorded every day at the same time and the software compares the recorded noise with the mean values of past records. The system can discern whether the noise has remarkably changed and, through phase analysis of the sound recorded by both microphones, identifies the direction of arrival (DOA) of the new noise, probably a steam leak. Using several heads, the new noise source can be identified. The video camera can be used to ease the location of the steam leaks. The stationariness of the measured noise has been tested in C.N. Cofrentes -a Spanish BWR-6 reactor-. A finished system with six heads has recently been installed in the MSR (moisture separator reheater) of the same plant. MALIBA is a master-slave tele-operated system with force feedback. It consists of two robots: a Stewart platform used as master robot and an open chain robot used as slave. The slave robot follows faithfully the movements of the master, and the master robot can reflect a force proportional to the force exerted by the slave on the environment. Three tools have been developed for the slave robot: a robot hand that includes a small video camera, a pneumatic drill and a rectifier. The results obtained have shown its effectiveness for the designed operations. ROBICEN is a lightweight pneumatic robot

  2. The waste isolation pilot plant project: a changing paradigm

    International Nuclear Information System (INIS)

    Sheppard, L.E.; McFadden, M.H.

    1996-01-01

    The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy (DOE) repository that has been developed to demonstrate the safe and permanent isolation of transuranic radioactive wastes in a deep geologic site. It is located in 650 m below the surface in a bedded salt formation, and is designed to hold approximately 175,500 cubic meters of waste. Compliance with the regulations has become the principal focus for the Project. The scientific baseline is an important and integral part of the CCA, as it provides the foundation for conducting total system performance assessment calculations for comparison with applicable standards. The activities required to support the scientific baseline are being pursued in parallel to minimize the time required to collect, analyze, interpret and fully incorporate the results into the CCA. The DOE has shifted its approach to demonstrating compliance with the applicable regulations from a paradigm of a series of broad investigations to a new paradigm of highly focused activities conducted in parallel. The success of this approach will be assessed by the EPA when the application is critically reviewed

  3. VT Biodiversity Project - Plant and Animal Species Atlas

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) This database contains town-level totals of documented species records for several plant and animal taxa including vascular plants, trees,...

  4. Environmental assessment for Mound Plant decontamination and decommissioning projects, Mound Plant, Miamisburg, Ohio

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) for seven decontamination and decommissioning (D ampersand D) projects at the Mound Plant in Miamisburg, Ohio, that have not been previously addressed in the Final Environmental Impact Statement for the Mound Facility (June 1979). Based on the information presented in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and the Department is issuing this Finding of No Significant Impact (FONSI)

  5. BACA Project: geothermal demonstration power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  6. Climatic chamber for plant physiology: a new project concept

    International Nuclear Information System (INIS)

    Materassi, A.; Fasano, G.; Arca, A.

    2005-01-01

    The two climatic chambers proposed here were designed and built for both general environmental physiology and specific studies on the effect of ultraviolet radiation on plants. The two chambers differ only for the fact that one of them, in addition to solar spectrum lamps, also has lamps which emit UV-B radiation. The environmental parameters taken into consideration are: luminous and UV-B radiation, air temperature and humidity, ozone and carbon dioxide concentration and air movement. Radiation can be continuously regulated, thus permitting simulation of twilight increasing and decreasing at the beginning and end of the photoperiod. Temperature cycles can be imposed between 5 and 40 deg C, while, for relative humidity, values can be imposed between 30% and 80%. Concentration of O3 can be maintained at values much lower than 0.1 ppm, the maximum value compatible with biological activity; CO2 concentration can be brought up to 3,000 ppm. Air movement inside the chambers is assured by ventilators and aspirators mounted on the devices which carry out regulation of the other environmental parameters. The controls of the various quantities are performed using medium-low cost commercial devices, while high level software manages them. In this way, good quality control of the environmental parameters is obtained with a much lower construction cost compared to other climatic chambers. Moreover, the use of commercial actuators permits easier and more immediate maintenance. Functionality tests, carried out both in transient and in steady state, have demonstrated a complete correspondence between project specifications and obtained results [it

  7. Project finance and photovoltaic power plants : a theoretical and practical perspective

    OpenAIRE

    Aasgaard, Anne Kristine

    2010-01-01

    Project finance is a defined structure for developing new activity which involves establishing the project as a separate unit. The review of literature exhibits the distinctive characteristics of project finance and provides a rationale of this form of financing. Project finance entails financial modelling, risk management, legal aspects and the creation of a financial structure. The thesis explores practical use of project finance in a case study of a photovoltaic power plant and presents a ...

  8. Strategically oriented project management of the decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Kemmeter, Sascha; Woempener, Andreas

    2013-01-01

    Due to the politically induced change of the energy sector in Germany, the operators of nuclear power plants had to react and to deal with completely new conditions concerning the decommissioning of their plants on short notice. Therefore the operators have to devise new strategies for controlling their decommissioning and dismantling projects in a short amount of time and most often similarly for several plants. Two fundamental procedures are possible for the successful controlling of these dismantling projects: a centralized or a decentralized management organization. How these project control processes can be realized in an optimal way, is, next to other economic specifications of the dismantling of nuclear power plants, the topic of a new research project of the Chair of Management Accounting at the University Duisburg-Essen. In that process, results and experiences from other research and practical projects concerning general large-scale projects are being used. Selected findings have been compiled and are being discussed in this paper. (orig.)

  9. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  10. Evaluation of salvage and replanted native plants on ADOT projects.

    Science.gov (United States)

    2012-06-01

    ADOT has transplanted thousands of saguaros during the construction of roadway projects, and although : the projects are typically tracked for two years, the long-term survivability of saguaros has never been : documented. The purpose of this study i...

  11. Balance of plant improvements for future reactor projects

    International Nuclear Information System (INIS)

    Hollingshaus, H.

    1987-01-01

    Many studies have shown that improvements in portions of the plant other than the reactor systems can yield large cost savings during the design, construction, and operation of future reactor power plants. This portion is defined as the Balance of Plant which includes virtually everything except the equipment furnished by the Nuclear Steam Supply System manufacturer. It normally includes the erection of the entire plant including the NSSS. Cost of BOP equipment, engineering and construction work is therefore most of the cost of the plant. Improvements in the BOP have been identified that will substantially reduce nuclear plant cost and construction time while at the same time increasing availability and operability and improving safety. Improvements achieved through standardizatoin, simplification, three-dimensional (3D) computer-aided design, modular construction, innovative construction techniques, and applications for Artificial Intelligence Systems are described. (author)

  12. The Ellweiler uranium plant - a demolition and recycling project

    International Nuclear Information System (INIS)

    Mika, S.; Rohr, T.; Seehars, R.; Feser, A.

    1999-01-01

    The uranium plant at Ellweiler, district of Birkenfeld, was used for the production and storage of uranium concentrates. The owner of the Ellweiler uranium plant (UAE), Gewerkschaft Brunhilde GmbH, ceased processing uranium ore and recycling in 1989 and has been in liquidation since September 1991. The State of Rhineland-Palatinate, had safety measures adopted in a first step, getting the plant into a safe state by former plant personnel. The entire plant was demolished in a second step. The contract for demolishing the former uranium plant was awarded to ABB Reaktor as the general contractor in August 1996. Demolition work was carried out between April 1997 and May 1999. A total of approx. 7900 Mg of material was disposed of. At present, recultivation measures are being carried out. (orig.) [de

  13. Emissions from decentralised CHP plants 2007 - Energinet.dk Environmental project no. 07/1882

    DEFF Research Database (Denmark)

    Nielsen, Malene; Nielsen, Ole-Kenneth; Thomsen, Marianne

    Updated emission factors for decentralised combined heat and power (CHP) plants with a capacity project emission measurements as well as emission measurements performed in recent years that were collected. The emission factors valid for 2006/2007 have been...... estimated for the plant technologies: Municipal solid waste (MSW) incineration plants, plants combusting straw or wood, natural gas fuelled reciprocating engines, biogas fuelled engines, natural gas fuelled gas turbines, gas oil fuelled reciprocating engines, gas oil fuelled gas turbines, steam turbines...

  14. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  15. Method for assigning sites to projected generic nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date.

  16. Method for assigning sites to projected generic nuclear power plants

    International Nuclear Information System (INIS)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date

  17. Status of projects using reject heat for aquaculture and horticulture at power plants in the EEC

    International Nuclear Information System (INIS)

    Aston, R.J.

    1988-08-01

    Data collected mainly from an inventory of waste heat projects in the EEC prepared by Potentiel Energie of Paris covers 46 projects approximately half of which are fish farms and half horticultural projects mainly in the form of greenhouses. About a half of the projects are run on a commercial basis while the other half are Research and Development (R and D) or demonstrations. At least 18 species of fish and 18 species of plant are produced at the various projects but eels and potted plants are grown at more of the commercially orientated projects than any other produce. There has been a significant increase in the number of commercially run projects during the past 10-15 years and this trend is likely to continue in view of the considerable savings that can be made on fuel. The size and number of commercial projects in the UK compares favourably with those in other EEC countries. (author)

  18. Port Menier thermal power plant: Pre-project report

    International Nuclear Information System (INIS)

    1992-02-01

    Port Menier, the town on Anticosti Island in the St Lawrence River estuary, is supplied with electricity from a diesel power plant having a firm capacity of 1,080 kW. Since 1987, power demand has increased at an average annual rate of 5.7%, raising the winter peak demand from 670 kW to 987 kW. The power plant is located in the center of town and is obsolete, presenting a number of architectural, environmental, and operational deficiencies. It is proposed to construct a new power plant having an initial firm capacity of 1,490 kW and storage capacity for 75,000 liters of fuel. The plant site will have an area of ca 6,265 m 2 to allow for an eventual expansion to over 3,000 kW capacity, sufficient for satisfying forecast demand over the next 20 years. Estimated cost of the new plant is ca $9.5 million. The old plant will be decommissioned and the new plant will be built at a site outside of town. The natural and human environments characteristic of the Port Menier area are detailed and the two selected sites for the new plant are described and compared. A site in the industrial zone of Port-Menier is favored. The environmental impacts of the new plant are analyzed and mitigation measures during the preconstruction, construction, and operational phases are proposed. Local economic impacts are estimated at around $990,000. 20 refs., 12 figs., 12 tabs

  19. Support services for new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, Alberto B.; Cazorla, Francisco

    2009-01-01

    TECNATOM is a spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. TECNATOM has worked in over 30 countries in activities related to the Operation and Maintenance of Nuclear Power Plants. It started to work in the design of new Nuclear Power Plants in the early 90s and since then has continued collaborating with different suppliers in the design and licensing of new reactors specially in the areas of plant systems design, Man-Machine Interface design, Main Control Room simulators building, training, qualification of equipment and PSI/ISI engineering services. (author)

  20. Experience of international projects implementation at Leningrad Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Zavialov, L.A. [Leningrad Nuclear Power Plant ' Rosenergoatom' , Leningrad Region, 188540, Sosnovy Bor (Russian Federation)

    2008-07-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  1. Experience of international projects implementation at Leningrad Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zavialov, L.A.

    2008-01-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  2. Long Frontal Projections Help Battus philenor (Lepidoptera: Papilionidae) Larvae Find Host Plants.

    Science.gov (United States)

    Kandori, Ikuo; Tsuchihara, Kazuko; Suzuki, Taichi A; Yokoi, Tomoyuki; Papaj, Daniel R

    2015-01-01

    Animals sometimes develop conspicuous projections on or near their heads as, e.g., weaponry, burrowing or digging tools, and probes to search for resources. The frontal projections that insects generally use to locate and assess resources are segmented appendages, including antennae, maxillary palps, and labial palps. There is no evidence to date that arthropods, including insects, use projections other than true segmental appendages to locate food. In this regard, it is noteworthy that some butterfly larvae possess a pair of long antenna-like projections on or near their heads. To date, the function of these projections has not been established. Larvae of pipevine swallowtail butterflies Battus philenor (Papilionidae) have a pair of long frontal fleshy projections that, like insect antennae generally, can be actively moved. In this study, we evaluated the possible function of this pair of long moveable frontal projections. In laboratory assays, both frontal projections and lateral ocelli were shown to increase the frequency with which search larvae found plants. The frontal projections increased finding of host and non-host plants equally, suggesting that frontal projections do not detect host-specific chemical cues. Detailed SEM study showed that putative mechanosensillae are distributed all around the frontal as well as other projections. Taken together, our findings suggest that the frontal projections and associated mechanosensillae act as vertical object detectors to obtain tactile information that, together with visual information from lateral ocelli and presumably chemical information from antennae and mouthparts, help larvae to find host plants. Field observations indicate that host plants are small and scattered in southern Arizona locations. Larvae must therefore find multiple host plants to complete development and face significant challenges in doing so. The frontal projections may thus be an adaptation for finding a scarce resource before starving to

  3. Hybrid Cooling for Geothermal Power Plants: Final ARRA Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Bharathan, D.

    2013-06-01

    Many binary-cycle geothermal plants use air as the heat rejection medium. Usually this is accomplished by using an air-cooled condenser (ACC) system to condense the vapor of the working fluid in the cycle. Many air-cooled plants suffer a loss of production capacity of up to 50% during times of high ambient temperatures. Use of limited amounts of water to supplement the performance of ACCs is investigated. Deluge cooling is found to be one of the least-cost options. Limiting the use of water in such an application to less than one thousand operating hours per year can boost plant output during critical high-demand periods while minimizing water use in binary-cycle geothermal power plants.

  4. Projected role of nuclear power in Egypt and problems encountered in implementing the first nuclear plant

    International Nuclear Information System (INIS)

    Effat, K.E.A.; Sirry, H.; El-Fouly, M.F.; El-Sharkawy, E.; El-Saiedi, A.F.

    1977-01-01

    This paper reviews the present and projected power demands in Egypt and the factors behind the decision to introduce a nuclear power generation program. Different problems encountered and anticipated in introducing the first nuclear power plant are also discussed

  5. Foaming in Hanford River Protection Project Waste Treatment Plant LAW Evaporation Processes - FY01 Summary Report

    International Nuclear Information System (INIS)

    Calloway, T.B.

    2002-01-01

    The LAW evaporation processes currently being designed for the Hanford River Protection Project Waste Treatment Plant are subject to foaming. Experimental simulant studies have been conducted in an effort to achieve an effective antifoam agent suitable to mitigate such foaming

  6. Guide for prioritizing power plant productivity improvement projects: handbook of availability improvement methodology

    International Nuclear Information System (INIS)

    1981-01-01

    As part of its program to help improve electrical power plant productivity, the Department of Energy (DOE) has developed a methodology for evaluating productivity improvement projects. This handbook presents a simplified version of this methodology called the Availability Improvement Methodology (AIM), which provides a systematic approach for prioritizing plant improvement projects. Also included in this handbook is a description of data taking requirements necessary to support the AIM methodology, benefit/cost analysis, and root cause analysis for tracing persistent power plant problems. In applying the AIM methodology, utility engineers should be mindful that replacement power costs are frequently greater for forced outages than for planned outages. Equivalent availability includes both. A cost-effective ranking of alternative plant improvement projects must discern between those projects which will reduce forced outages and those which might reduce planned outages. As is the case with any analytical procedure, engineering judgement must be exercised with respect to results of purely mathematical calculations

  7. Radiology and the cancer services collaborative - an opportunity awaits

    International Nuclear Information System (INIS)

    Garvey, C.J.; Seymour, R.; Wright, L.

    2003-01-01

    The principles and methodologies used by the Cancer Services Collaborative (CSC) are particularly relevant for radiology departments. A radiology project looking at the provision of barium enema examinations is used to highlight how the principles can be applied to a radiology department. Advice on how to access available CSC literature is offered. The CSC principles and methodologies are an important part of the NHS modernization agenda, and offer an exciting vehicle to improve patient care. It is important that radiologists understand the opportunities offered and the challenges posed by the modernization agenda

  8. Summary of developments and future projects in nuclear power plant control and instrumentation in the Netherlands

    International Nuclear Information System (INIS)

    Plas, Y. van der

    1990-01-01

    A general view is given on the developments and trends due to instrumentation and control of the two nuclear power plants in the Netherlands around the year 1989. Several projects, under which for classification of systems and components and for emergency operating procedures, are executed in both plants. An OSART mission initiated a project to make possible the periodic test of safety commands during operation. An other large project concerned the replacement of the process presentation system in Nuclear Power Plant Borssele. In the article several other developments due to the application of I and C in existing plants are outlined generally. Since 1974, no new nuclear power plants have been constructed in the Netherlands. (author). 2 figs

  9. Optimization of advanced plants operation: The Escrime project

    International Nuclear Information System (INIS)

    Fiche, C.; Papin, B.

    1994-01-01

    The Escrime program aims at defining the optimal share of tasks between humans and computers under normal or accidental plant operation. Basic principles we keep in mind are the following: human operators are likely to be necessary in the operation of future plants because we cannot demonstrate that plant design is error free, so unexpected situation can still happen; automation must not release the operators from their decisional role but only help them avoiding situations of cognitive overload which can lead to increase the risk of errors; the optimum share of tasks between human and automatic systems must be based on a critical analysis of the tasks and of the way they are handled. The last point appeared to be of major importance. The corresponding analysis of the French PWR's operating procedures enabled us to define a unified scheme for plant operation under the form of a hierarchy of goals and means. Beyond this analysis, development of a specific testing facility is under way to check the relevance of the proposed plant operation organization and to test the human-machine cooperation in different situations for various levels of automation. 7 refs, 4 figs

  10. Data base on nuclear power plant dose reduction research projects

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated.

  11. Data base on nuclear power plant dose reduction research projects

    International Nuclear Information System (INIS)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated

  12. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  13. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  14. Control room modernization at Finnish nuclear power plants - Two projects compared

    International Nuclear Information System (INIS)

    Laarni, J.; Norros, L.

    2006-01-01

    The modernization of automation systems and human-machine interfaces is a current issue at both of the two nuclear power plants (i.e., Fortum's Loviisa plant and TVO's Olkiluoto plant) in Finland. Since the plants have been launched in the 1970's or 1980's, technology is in part old-fashioned and needs to be renewed. At Olkiluoto upgrades of the turbine operator systems have already been conducted; at Loviisa the first phase of the modernization project has just started. Basically, there is a question of the complete digitalization of the information streams at the two plants, and transition from a conventional hard-wired or hybrid control room to a screen-based one. The new human-machine interfaces will comprise new technology, such as PC workstations, soft control, touch screens and large-screen overall displays. The modernization of human-system interfaces is carried out in a stepwise manner at both plants. At both plants the main driver has not been the need to renew the user interfaces of the control room, but the need to upgrade the automation systems. In part because of this, there is a lack of a systematic top-down approach in which different aspects of human factors (HF) engineering are considered in relationship to higher level goals. Our aim here is to give an overview description of the control room modernization projects at the two plants and provide a preliminary evaluation of their progress to date. The projects are also compared, for example, in terms of duration, scope and phasing, and who is responsible for the realization of the project. In addition, we also compare experiences from the Finnish projects to experiences from similar projects abroad. The main part of the data used in this study is based on designers' and project members' interviews. (authors)

  15. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  16. Study and Proposal of the Nuclear Power Plant Technology for the Ninh Thuan 2 Project

    International Nuclear Information System (INIS)

    Tran Chi Thanh; Le Van Hong; Hoang Sy Than; Nguyen Van De; Mai Dinh Trung; Nguyen Nhi Dien; Nguyen Minh Tuan; Pham Van Lam; Phan Ngoc Tuyen; Do Chi Dung; Hoang Minh Giang; Le Dai Dien

    2015-01-01

    The Ninh Thuan 1&2 Nuclear Power Plant Projects were approved on November 25th, 2009. At present, the task of NPP technology selection of these projects is an important and complex task. This report will show the acceptable method to create a set of criterion for selecting technology for Ninh Thuan 2 NPP project. The result of evaluation of three NPP technologies, such as ATMEA1, AP1000 and MPWR+ introduced in the Feasibility Study Reports of this project, will be discussed. In conclusion, the AP1000 technology is the first candidate for the Ninh Thuan 2 NPP Project. (author)

  17. Quality assurance in technology development for The Clinch River Breeder Reactor Plant Project

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1980-01-01

    The Clinch River Breeder Reactor Plant Project is the nation's first large-scale demonstration of the Liquid Metal Fast Breeder Reactor (LMFBR) concept. The Project has established an overall program of plans and actions to assure that the plant will perform as required. The program has been established and is being implemented in accordance with Department of Energy Standard RDT F 2-2. It is being applied to all parts of the plant, including the development of technology supporting its design and licensing activity. A discussion of the program as it is applied to development is presented

  18. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  19. Power plant project success through total productive generation

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L.

    1996-11-01

    The Total Productive Generation concept (TPG) defines the lines of action adopted by IVO Generation Services Ltd (IGS) for the operation and maintenance of power plants. The TPG concept is based on procedures tested in practice. The main idea of TPG is continuous development of quality, which is a joint effort of the entire staff. Its objective is to benefit IGS`s own staff and, in particular, the company`s customers. (orig.)

  20. Current situation of the project of 3. and 4. block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Suchy, L.

    2006-01-01

    The contribution shows the basic information about the crucial milestone of 3. building and the current situation of the project of 3. and 4. block of the nuclear power plant Mochovce. Contribution also shows what activities were realized and what material in area of designation of the technical and safety standard of the project was elaborated in the past, the main activities planned for 2006 have been described, support for Feasibility Study elaborated by ENEL and description of the integrated management system. The basic thesis crucial for the next steps on the project of 3. and 4. block of Nuclear Power Plant Mochovce is presented in the conclusion

  1. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  2. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  3. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  4. Next Generation Nuclear Plant Project 2009 Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick; Jim Kinsey; Keith Perry; Dave Petti

    2010-05-01

    The mission of the NGNP Project is to broaden the environmental and economic benefits of nuclear energy technology to the United States and other economies by demonstrating its applicability to market sectors not served by light water reactors (LWRs). Those markets typically use fossil fuels to fulfill their energy needs, and high temperature gas-cooled reactors (HTGRs) like the NGNP can reduce this dependence and the resulting carbon footprint.

  5. Signal validation of SPDS variables for Westinghouse and Combustion Engineering plants - an EPRI project

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    Signal validation in the context of this project is the process of combining information from multiple plant sensors to produce highly reliable information about plant conditions. High information reliability is achieved by the use of redundant sources of information and by the inherent detection, identification, and isolation of faulty signals. The signal validation methodology that has been developed in previous EPRI-sponsored projects has been enhanced and applied toward validation of critical safety-related SPDS signals in the Northeast Utilities Millstone 3 Westinghouse PWR plant and the Millstone 2 Combustion Engineering PWR plant. The designs were implemented in FORTRAN software and tested off-line using recorded plant sensor data, RETRAN-generated simulation data, and data to exercise software logic branches and the integration of software modules. Designs and software modules have been developed for 15 variables to support six PWR SPDS critical safety functions as required by a utility advisory group attached to the project. The signal validation process automates a task currently performed by plant operators and does so with consistent, verified logic regardless of operator stress and training level. The methodology uses a simple structure of generic software blocks, a modular implementation, and it performs effectively within the processor and memory constraints of modern plant process computers. The ability to detect and isolate sensor failures with greater sensitivity, robustness, and coverage of common-cause failures should ultimately lead to improved plant availability, efficiency, and productivity

  6. Project of mechanical components for nuclear power plants

    International Nuclear Information System (INIS)

    Amaral, J.A.R. do; Farias Brito David, D. de

    1984-01-01

    The equipment foreseen to be part of a nuclear power plant must show high quality and safety due to the presence of radioactivity. Besides the perfect functioning during the rigid operating conditions, some postulated loadings are foreseen, like earthquake and loss of coolant accidents, which must be also considered in the design of the components. The design and calculation's concept and development, the interactions with the piping and civil designs, as well as their influences in the licensing process with the authorities are described. (Author) [pt

  7. 12 CFR 9.10 - Fiduciary funds awaiting investment or distribution.

    Science.gov (United States)

    2010-01-01

    ... distribution. 9.10 Section 9.10 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY... has investment discretion, the bank shall obtain for funds awaiting investment or distribution a rate... principal and interest; (ii) Securities that qualify as eligible for investment by national banks pursuant...

  8. Purposes and related aspects of the nuclear power plant aging Project

    International Nuclear Information System (INIS)

    Garaud, J.; Reynes, L.; Montardy, A. de

    1989-01-01

    The purposes and some aspects of the nuclear power plant Lifetime project is presented. The work is focused on the study of the aging of the PWR type power plant components. The project consists in two phases. The first one involves: the status reports and the analysis of the lifetime data of the most sensitive units, as well as the applied actions and proposals, the influence of the exploitation modes, the safety and the cost prospectives. The second phase includes: the definition, the contracts, the complementary actions and their achievement, the reasons and the surveyance improvements, the development of the decision supporting means, the summary and the conclusions. The selected units for the project first step and the project of actions, are listed. The first conclusions of the project show that most of the 900 MW PWR reactor components will have about 40 years of service life [fr

  9. Economic-financial analysis of 'Angra 3 Nuclear Power Plant' project

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2005-01-01

    This paper presents an economic-financial evaluation of 'Angra 3 Nuclear Power Plant' project and estimates the lowest power tariff value at which power potentially made available may be commercialized and yet ensure the project a profitability level agreeable to the interests of economic agents and shareholders. According to the 'project evaluation' practice, Angra 3 power generation was considered separately from ELETRONUCLEAR's operating plants (Angra 1 and Angra 2), thus preventing result distortions bound to occur if the economic-financial variables of the new project were analyzed associated with financial commitments and commercialization conditions resulting from the project implementation process and the generated power commercialization conditions, respectively. For this evaluation different technical and economic scenarios were devised, and the theory of Capital Asset Pricing Model for Own Capital cost and that of Weighted Average Cost of Capital were used in addition to the forecast of the Statement of Results and Free Cash flow of Shareholders throughout the power plant life, which is the estimate basis for the lowest power tariff value and the Internal Return Rate of the project. The evaluation conclusion is that Angra 3 project is technically and economically feasible and competitive as compared to the new large power generation projects planned for power supply in Brazil in the next decade, mainly in the Southeast. (author)

  10. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland

  11. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-14

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.

  12. Economic and environmental evaluation of investment projects of biogas plants

    International Nuclear Information System (INIS)

    Guzmán Marrero, Elizabeth; Guzmán Chinea, Jesús Manuel; Mata Varela, Milagros C.; Pérez González, Yanet

    2015-01-01

    The economic evaluation of the implementation and use of renewable energy is an issue of paramount importance and has been approached from different perspectives by different authors in different countries. Biogas technology has its own characteristics that make it more complex analysis involved not only in this case the energy aspect but there is also a significant impact on health assessment difficult, fertilization, soil improvement, animal feed and improved conditions of life. The capital budgeting, in conjunction with the planning process, is a key economic tool for decision making and in turn represents an ongoing challenge for the agricultural sector. It is a necessity of our country, together with the entire world, potentiate the action to correct management of organic waste generated in intensive pig farming, to contribute to the reduction of environmental impacts that this work causes. Studies in this area show the shortcomings that exist in Cuban law established for the evaluation of investment projects, both in its structure and in its cycle, without taking into account important elements such as risk analysis. This research evaluates the economic and financial feasibility of an investment project, including a social and environmental assessment of the same financial justification for the inclusion of risk analysis in the evaluation process (full text)

  13. Joint Arab project for building of nuclear power plants

    International Nuclear Information System (INIS)

    Mosbah, D.S.

    2010-01-01

    Recently many Arab countries have expressed their interest in adopting nuclear power for electricity generation and seawater desalination in their energy strategies and hence sought assistance from IAEA and Arab Atomic Energy Agency. The Council of the League of Arab States at the summit level encouraged member states to develop peaceful use of atomic energy in different aspects of development, especially in energy generation and to establish a cooperative Arab program in this field. The burden of infrastructure can be reduced significantly if an Arab country forms a sharing partnership with other Arab countries. The sharing can be between two or more Arab states. It can include physical facilities, common programmes and knowledge, which will reflect in economic benefits. The sharing can also contribute in a significant manner to harmonization of codes and standards in general and regulatory framework in particular. This article outlines the major direct benefits of joint nuclear Arab programme to build a Nuclear Power Plants. (author)

  14. Evaluation of the uranium enrichment demonstration plant project

    International Nuclear Information System (INIS)

    Sugitsue, Noritake

    2001-01-01

    In this report, the organization system of the uranium enrichment business is evaluated, based on the operation of the uranium enrichment demonstration plant. As a result, in uranium enrichment technology development or business, it was acknowledged that maintenance of the organization which has the Trinity of a research/engineering/operation was necessary in an industrialization stage by exceptional R and D cycle. Japan Nuclear Fuel Ltd. (JNFL) set up the Rokkashomura Aomori Uranium Enrichment Research and Development Center in November 2000. As a result, the system that company directly engaged in engineering development was prepared. And results obtained in this place is expected toward certain establishment of the uranium enrichment business of Japan. (author)

  15. Project quality management under EPC mode by the owner of nuclear power plant

    International Nuclear Information System (INIS)

    Xu Hui; Hu Miao

    2014-01-01

    As the first completely independent nuclear power project in China, Fangjiashan nuclear power project is constructed under EPC mode of general project contracting. This paper, taking the project as an example, aims to explore how the project owners carry out quality management for the installation project during the construction of the nuclear power plant based on EPC mode. It has certain reference value for the management of following nuclear power projects which adopting the EPC construction mode. It will play a positive role in improving China's overall self-management abilities in the nuclear power construction, and lay a solid foundation for follow-up nuclear power construction in China. (authors)

  16. Technical data for concentrated solar power plants in operation, under construction and in project

    Directory of Open Access Journals (Sweden)

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  17. Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex

  18. Steam gasification of coal, project prototype plant nuclear process heat

    International Nuclear Information System (INIS)

    Heek, K.H. van

    1982-05-01

    This report describes the tasks, which Bergbau-Forschung has carried out in the field of steam gasification of coal in cooperation with partners and contractors during the reference phase of the project. On the basis of the status achieved to date it can be stated, that the mode of operation of the gas-generator developed including the direct feeding of caking high volatile coal is technically feasible. Moreover through-put can be improved by 65% at minimum by using catalysts. On the whole industrial application of steam gasification - WKV - using nuclear process heat stays attractive compared with other gasification processes. Not only coal is conserved but also the costs of the gas manufactured are favourable. As confirmed by recent economic calculations these are 20 to 25% lower. (orig.) [de

  19. Project No. 6 - Replacement of the heating and steam plant

    International Nuclear Information System (INIS)

    2000-01-01

    At present the Ignalina NPP facilities and Visaginas town are supplied with heat and steam from the district heating facility at Ignalina NPP. A back-up system, dating from 1979, supplies heat and steam when the district heating system is under repair or in case of outages of units 1 and 2. The existing back-up system does no longer meet with applicable technical and safety standards. A breakdown of the back-up system might result in the interruption of the supply to Ignalina NPP of heat and steam necessary for a number of processes, including waste management. Reconstruction of the existing boiler houses is not economically viable option, nor recommendable, for safety reasons, as it would mean the temporary closing of the back-up system. Project activities includes the design, construction and commissioning of the proposed facility, including all licensing documentation

  20. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  1. Hanford Waste Vitrification Plant Project advanced conceptual design summary report

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1988-11-01

    The Hanford Waste Vitrification Plant (HWVP) will immobilize Hanford defense liquid high-level waste in borosilicate glass in preparation for shipment to a geologic repository. The shipment of the waste to the repository will satisfy an objective in the President's Defense Waste Management Plan. The glass product will be cast into stainless steel canisters, which will be sealed and stored at Hanford until they are shipped. This document summarizes work performed during the Advance Conceptual Design (ACD) of the HWVP. In the Reference Conceptual Design phase, which preceded the ACD, a number of design issues were identified with the potential to improve cost effectiveness, safety, constructibility, and operability. The ACD addressed and evaluated these design issues. Implementation of recommendations derived from ACD work will occur in subsequent design phases. The next design phase is preliminary design which will be followed by detailed design and construction. Net potential cost improvements of more than $36.9M were identified along with improvements in safety, constructibility, and operability. No negative schedule impacts will result from implementation of the improvements. 11 refs., 5 figs., 3 tabs

  2. Geomechanical applications for the Waste Isolation Pilot Plant (WIPP) project

    International Nuclear Information System (INIS)

    Matalucci, R.V.; Hunter, T.O.

    1981-01-01

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility in bedded salt addressing the technical issues associated with the demonstration of disposal of radioactive waste from the defense programs of the USA. The geomechanical program includes laboratory experimentation, constitutive model and computer code development, and in-situ experimentation. Various material models, including creep for salt, and techniques for predicting room response under thermal and mechanical loads have been developed and are being applied to experiment and facility designs. A Benchmark II study has been conducted to compare the capabilities of nine structural codes to predict response of underground configuration under ambient temperature and with a thermal load of 7.5 W/m 2 . Parametric studies are being conducted to evaluate optimum room configurations. A series of in situ experiments is the next step towards validating models and predictive techniques. These experiments will be conducted in a facility in southeastern New Mexico mined at a depth of 659 m

  3. Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1993-12-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant

  4. Franchise project for the Wettingen power plant; Konzessionsprojekt Kraftwerk Wettingen

    Energy Technology Data Exchange (ETDEWEB)

    Operto, G. [Elektrizitaetswerk der Stadt Zuerich EWZ, Zurich (Germany); Zimmermann, C. [Creato, Netzwerk fuer kreative Umweltplanung, Ennetbaden (Switzerland)

    1999-02-05

    Even today, after 65 years of operation, the Wettingen hydroelectric power plant of EWZ still retains many of its original components. They are technically obsolete and need to be replaced. Investments to be made by the municipal works of Zurich (EWZ) are of the order of magnitude of 60 to 70 million Swiss francs. These investments will not have paid back by the time the franchise expires in 2013; therefore, the city of Zurich is negotiating with the two franchise givers, the canton governments of Aargau and Zurich, seeking to obtain premature renewal of the franchise under which it is entitled to use the water rights. Thanks to the installation of a new turbine in the retaining weir, it will then be possible to increase residual water flow over the distance of 1300 metres twelve to twenty-fold. (orig.) [Deutsch] Noch heute, nach 65 Betriebsjahren, bestehen viele Anlageteile des EWZ-Flusskraftwerks Wettingen im Originalzustand. Sie sind technisch veraltet und muessen deshalb erneuert werden. Die geplante Erneuerung erfordert vom Elektrizitaetswerk der Stadt Zuerich (EWZ) Investitionen in der Groessenordnung von 60 bis 70 Millionen Franken. Da sich diese Investitionen bis zum Ablauf der Konzession im Jahre 2013 nicht amortisieren lassen, verhandelt die Stadt Zuerich mit den beiden Konzessionsgebern, den Kantonen Aargau und Zuerich, um eine vorzeitige Erneuerung der Konzession zur Nutzung der Wasserrechte zu erhalten. Dank dem Einbau einer neuen Dotierturbine im Stauwehr wird es dann moeglich sein, die Wasserfuehrung in der 1300 m langen Restwasserstrecke auf das Zwoelf- bis Zwanzigfache des heutigen Wertes zu erhoehen. (orig.)

  5. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  6. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  7. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  8. Demonstration project: Oxy-fuel combustion at Callide-A plant

    Energy Technology Data Exchange (ETDEWEB)

    Makino, Keiji; Misawa, Nobuhiro; Kiga, Takashi; Spero, Chris

    2007-07-01

    Oxy-fuel combustion is expected to be one of the promising systems on CO2 recovery from pulverized-coal power plant, and enable the CO2 to be captured in a more cost-effective manner compared to other CO2 recover process. An Australia-Japan consortium was established in 2004 specifically for the purpose of conducting a feasibility study on the application of oxy-fuel combustion to an existing pulverized-coal power plant that is Callide-A power plant No.4 unit at 30MWe owned by CS Energy in Australia. One of the important components in this study has been the recent comparative testing of three Australian coals under both oxy-fuel and air combustion conditions using the IHI combustion test facilities. The tests have yielded a number of important outcomes including a good comparison of normal air with oxy-fuel combustion, significant reduction in NOx mass emission rates under oxy-fuel combustion. On the basis of the feasibility study, the project under Australia-Japan consortium is now under way for applying oxy-fuel combustion to an existing plant by way of demonstration. In this project, a demonstration plant of oxy-fuel combustion will be completed by the end of 2008. This project aims at recovering CO2 from an actual power plant for storage. (auth)

  9. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  10. Engineering for new-built nuclear power plant projects; Ingenieria para proyectos de nuevas centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez Lopez, A.

    2012-11-01

    This article reviews the opportunities existing in the market (electrical utilities and reactor vendors) for an engineering company with the profile of Empresarios Agrupados (EA) in new-built nuclear power plant projects. To do this, reference is made to some representative examples of projects in which EA has been participating recently. the article concludes sharing with the reader some lessons learned from this participation. (Author)

  11. Pilot project concerning the establishment of a collective biomass conversion plant on the island of Mors

    International Nuclear Information System (INIS)

    1993-06-01

    This pilot project comprises a feasibility study in connection with plans to establish a biomass conversion plant, on the Danish island of Mors, which would provide methane to be used as fuel, in combination with natural gas, for a cogeneration plant serving six villages. The subjects of location, organization, the transportation of biomass, the design of the biomass conversion plant, economical aspects and conditions of the use of the methane are discussed as a basis for decisions in this respect. Environmental considerations are also dealt with. (AB)

  12. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  13. [New materia medica project: synthetic biology based bioactive metabolites research in medicinal plant].

    Science.gov (United States)

    Wang, Yong

    2017-03-25

    In the last decade, synthetic biology research has been gradually transited from monocellular parts or devices toward more complex multicellular systems. The emerging plant synthetic biology is regarded as the "next chapter" of synthetic biology. The complex and diverse plant metabolism as the entry point, plant synthetic biology research not only helps us understand how real life is working, but also facilitates us to learn how to design and construct more complex artificial life. Bioactive compounds innovation and large-scale production are expected to be breakthrough with the redesigned plant metabolism as well. In this review, we discuss the research progress in plant synthetic biology and propose the new materia medica project to lift the level of traditional Chinese herbal medicine research.

  14. Advanced conceptual design report: T Plant secondary containment and leak detection upgrades. Project W-259

    International Nuclear Information System (INIS)

    Hookfin, J.D.

    1995-01-01

    The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades

  15. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  16. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS: Executive summary

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level

  17. Contribution of research and development and engineering to a large reprocessing plant project. Extension of the La Hague plant

    International Nuclear Information System (INIS)

    Boutaud de la Combe, P.; Courouble, J.M.; Sauteron, J.; Redon, A.

    1983-01-01

    Two reprocessing plants are operated by Cogema: Marcoule (since 1958) and La Hague (since 1967). Since 1976 the latter has been reprocessing LWR assemblies in its 'HAO' workshop, operation of which has provided industrial experience in the reprocessing of this type of fuel. This experience will be drawn upon in the construction of extensions to the La Hague plant, namely the UP3 plant, which will have a capacity of 800 t/a, and UP2-800, which will expand the present plant likewise to a capacity of 800 t/a. These extensions will contain a number of improvements, particularly in the areas of safety and waste treatment, and of procedure and equipment. A considerable R and D contribution is provided by the French Atomic Energy Commission (CEA), which is the licence holder, with its laboratories at Fontenay and the pilot workshop and industrial prototypes service at Marcoule. This activity supports all phases of the project, from the establishment of basic principles to the definition of essential characteristics of equipment, covering also the testing of full-scale prototypes (mock-ups) for the principal components: rotating continuous dissolver, swinging decanter, subcritical pulsed columns, used-solvent distilling apparatus, fission-product vitrification furnace, etc. Engineering work for the new facilities is performed by the Societe generale pour les techniques nouvelles in four phases: (1) establishment of basic data; (2) preparation of preliminary plans (including an estimate and a preliminary schedule) and of the preliminary safety reports; (3) drafting of the 'project' file, giving definitive costs and deadlines; (4) implementation, up to and including the operational testing stage. All phases of design and implementation are subject to a quality assurance programme. Extension of the La Hague plant represents an investment of 23,500 million French francs (in July 1981). Construction is expected to be completed in 1989. (author)

  18. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  19. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  20. Solution and implementation of project ''Simulator of WWER-440 nuclear power plant''

    International Nuclear Information System (INIS)

    Koukal, V.

    1985-01-01

    The time data are given of the development and construction of the simulator of a WWER-440 nuclear power plant unit. The individual tasks are summed up which are related to the project implementation, and cooperating institutions and enterprises are listed. (J.C.)

  1. Projecting trends in plant invasions in Europe under different scenarios of future land-use change

    Czech Academy of Sciences Publication Activity Database

    Chytrý, M.; Wild, Jan; Pyšek, Petr; Jarošík, Vojtěch; Dendoncker, N.; Reginster, I.; Pino, J.; Maskell, L. C.; Vila, M.; Pergl, Jan; Kühn, I.; Spangenberg, J.H.; Settele, J.

    2012-01-01

    Roč. 21, č. 1 (2012), s. 75-87 ISSN 1466-822X R&D Projects: GA MŠk LC06073 Institutional research plan: CEZ:AV0Z60050516 Institutional support: RVO:67985939 Keywords : plant invasions * land-use change * prediction Subject RIV: EF - Botanics Impact factor: 7.223, year: 2012

  2. GRIN-Global: An International Project to Develop a Global Plant Genebank Information Management System

    Science.gov (United States)

    The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...

  3. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  4. Project management in fossil plant construction: A perspective for the Nineties

    International Nuclear Information System (INIS)

    Bhatia, N.K.

    1991-01-01

    The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model

  5. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Final EIR/EIS

    International Nuclear Information System (INIS)

    1994-01-01

    On May 26, 1994, the Lake County Sanitation District and the US Bureau of Land Management released for public review a Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) on the proposed Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. A minimum 45-day review and comment period began on that date and notices were published in the Federal Register. The public review and comment period closed on July 26, 1994. Public hearings on the Draft EIMIS were held in Lakeport, CA, on June 30 and July 14, 1994. The first part of this document contains copies of the written comments submitted on the Draft EIR/EIS. It also contains summary paraphrased comments of the public hearings. The second part of this document contains responses to the comments

  6. Data base on dose reduction research projects for nuclear power plants: Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Baum, J.W.

    1989-05-01

    This is the third volume in a series of reports that provide information on dose-reduction research and health physics technology for nuclear power plants. The information is taken from data base maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. This report presents information on 80 new projects, covering a wide area of activities. Projects on steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Collective dose data from the United States and other countries are also presented. In the conclusion, we suggest that although new advanced reactor design technology will eventually reduce radiation exposures at nuclear power plants to levels below serious concern, in the interim an aggressive approach to dose reduction remains necessary. 20 refs.

  7. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  8. Suitable Days for Plant Growth Disappear under Projected Climate Change: Potential Human and Biotic Vulnerability.

    Directory of Open Access Journals (Sweden)

    Camilo Mora

    2015-06-01

    Full Text Available Ongoing climate change can alter conditions for plant growth, in turn affecting ecological and social systems. While there have been considerable advances in understanding the physical aspects of climate change, comprehensive analyses integrating climate, biological, and social sciences are less common. Here we use climate projections under alternative mitigation scenarios to show how changes in environmental variables that limit plant growth could impact ecosystems and people. We show that although the global mean number of days above freezing will increase by up to 7% by 2100 under "business as usual" (representative concentration pathway [RCP] 8.5, suitable growing days will actually decrease globally by up to 11% when other climatic variables that limit plant growth are considered (i.e., temperature, water availability, and solar radiation. Areas in Russia, China, and Canada are projected to gain suitable plant growing days, but the rest of the world will experience losses. Notably, tropical areas could lose up to 200 suitable plant growing days per year. These changes will impact most of the world's terrestrial ecosystems, potentially triggering climate feedbacks. Human populations will also be affected, with up to ~2,100 million of the poorest people in the world (~30% of the world's population highly vulnerable to changes in the supply of plant-related goods and services. These impacts will be spatially variable, indicating regions where adaptations will be necessary. Changes in suitable plant growing days are projected to be less severe under strong and moderate mitigation scenarios (i.e., RCP 2.6 and RCP 4.5, underscoring the importance of reducing emissions to avoid such disproportionate impacts on ecosystems and people.

  9. A survey of research projects in maintenance optimization for Electricite de France power plants

    International Nuclear Information System (INIS)

    Jacquot, J.P.

    1996-01-01

    Six years ago, Electricite de France launched a Reliability Centered Maintenance (RCM) pilot project to optimize preventive maintenance for its nuclear power plants. After a feasibility study, a Reliability Centered Maintenance (RCM) method was standardized. It is now applied on a large scale to the 50 EDF nuclear units. A RCM workstation based on this standardized method has been developed and is now used in each plant. In the next step, the author will consider whether a risk based approach can be included in this RCM process in order to analyze critical passive components such as pipes and supports. Considering the potential advantages of these optimization techniques, a dedicated process has been also developed for maintenance of future plants, gas turbines, or nuclear units. For these future plants, a Logistic Support Analysis (LSA) will be added to the RCM process to globally evaluate availability, safety and maintenance costs. This paper will present a survey of these different developments of methods and tools

  10. An ANP-based approach for the selection of photovoltaic solar power plant investment projects

    International Nuclear Information System (INIS)

    Aragones-Beltran, P.; Pastor-Ferrando, J.P.; Rodriguez-Pozo, F.; Chaparro-Gonzalez, F.

    2010-01-01

    In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (author)

  11. Future-oriented computerized information system for power plant process control in a pilot project at Philippsburg nuclear power plant

    International Nuclear Information System (INIS)

    Woehrle, G.; Kraft, M.

    1988-01-01

    The motivation for the pilot project at Philippsburg nuclear power plant resulted from the Three Mile Island accident in 1979. The primary task embraces an efficient computer-aided reduction of information when a fault occurs based on a process engineering analysis of the information accrued. Accompanying this are a consolidation and evaluation of the information available in the control room. In this pilot project the new tasks of status monitoring, information reduction and operationalcontrol have been realized for the first time using a computer-aided process information system. In addition to the existing control computer, an information computer with approximately 1200 analogue and about 10000 binary signals has been installed. The installation of the system was completed in 1984 and in the meantime initial operational experience has become available. (orig.) [de

  12. RIBA Project - Risk-Informed approach for In-Service Inspection of Nuclear Power Plant Components. Project summary

    International Nuclear Information System (INIS)

    Lidbury, D.; Smith, G.

    2001-12-01

    The need for a European review of a Risk-Informed Approach for In-Service Inspection of Nuclear Power Plant Components (RIBA) was identified in 1998. This was as a priority item in the programme of activities conducted in the framework of the Council Resolutions of 22 July 1975 and of 18 June 1992 on the Technological Problems of Nuclear Safety. The RIBA Project was established in November 1999 as a 24-month Study Contract funded by the European Commission within the frame of the former DG XI WGCS (Working Group on Codes and Standards). The Study Contract was subsequently managed for the EC by DG TREN. The participants in RIBA were Serco Assurance (project coordinator), Ringhals AB, EDF, Tecnatom SA and Westinghouse Electric Europe. The work is presented in a summary report with the detailed results contained in three companion reports as follows: main conclusions and recommendations, Review of Existing Risk-Informed Methodologies, A Comparative Study of Risk-Informed In-Service Inspection Applications, Conclusions and Recommendations for Risk-Informed in-service inspection methodology applied to Nuclear Power Plants in Europe. (author)

  13. Macro optical projection tomography for large scale 3D imaging of plant structures and gene activity.

    Science.gov (United States)

    Lee, Karen J I; Calder, Grant M; Hindle, Christopher R; Newman, Jacob L; Robinson, Simon N; Avondo, Jerome J H Y; Coen, Enrico S

    2017-01-01

    Optical projection tomography (OPT) is a well-established method for visualising gene activity in plants and animals. However, a limitation of conventional OPT is that the specimen upper size limit precludes its application to larger structures. To address this problem we constructed a macro version called Macro OPT (M-OPT). We apply M-OPT to 3D live imaging of gene activity in growing whole plants and to visualise structural morphology in large optically cleared plant and insect specimens up to 60 mm tall and 45 mm deep. We also show how M-OPT can be used to image gene expression domains in 3D within fixed tissue and to visualise gene activity in 3D in clones of growing young whole Arabidopsis plants. A further application of M-OPT is to visualise plant-insect interactions. Thus M-OPT provides an effective 3D imaging platform that allows the study of gene activity, internal plant structures and plant-insect interactions at a macroscopic scale. © The Author 2016. Published by Oxford University Press on behalf of the Society for Experimental Biology.

  14. Challenges associated with the design of underground grinding plant at McArthur River project

    International Nuclear Information System (INIS)

    Jamrozek, J.S.

    2000-01-01

    McArthur River is an unique high grade uranium underground mine. Ore grinding and thickening are part of the underground operation. The grinding circuit is designed to operate in conditions different from conventional plant environments. Design of the grinding plant was a collective effort of a multi-disciplinary engineering team closely cooperating with project operating personnel. The equipment had to be selected to reflect widely varying ore properties. A user-friendly plant layout provides access to equipment inspections, services, and the delivery of necessary components. The size of the grinding chamber was limited in order to keep the rock stress levels within allowable values. All underground equipment brought to the construction site was restricted in size and weight. Plant construction faced limited storage space underground, tight erection sequencing, and schedule. Plant ventilation is a critical design feature. It efficiently removes radioactive dust from work areas, eliminates stagnant air pockets, and separates clean air from contaminated air areas. Radiation shielding on the equipment is designed to correspond with operational and maintenance functions. Plant operation is remotely controlled and requires little attendance. Video cameras are used on critical equipment and in controlled access areas. An extensive program of preventive and predictive maintenance allows highly reliable plant operation. (author)

  15. The Power Plant Mapping Student Project: Bringing Citizen Science to Schools

    Science.gov (United States)

    Tayne, K.; Oda, T.; Gurney, K. R.; O'Keeffe, D.; Petron, G.; Tans, P. P.; Frost, G. J.

    2014-12-01

    An emission inventory (EI) is a conventional tool to quantify and monitor anthropogenic emissions of greenhouse gases and air pollutants into the atmosphere. Gridded EI can visually show geographical patterns of emissions and their changes over time. These patterns, when available, are often determined using location data collected by regional governments, industries, and researchers. Datasets such as Carbon Monitoring and Action (CARMA, www.carma.org) are particularly useful for mapping emissions from large point sources and have been widely used in the EI community. The EI community is aware of potentially significant errors in the geographical locations of point sources, including power plants. The big challenge, however, is to review tens of thousands of power plant locations around the world and correct them where needed. The Power Plant Mapping Student Project (PPMSP) is a platform designed for students in 4th through 12th grade to improve the geographical location of power plants indicated in existing datasets to benefit international EI research. In PPMSP, we use VENTUS, a web-based platform (http://ventus.project.asu.edu/) that invites citizens to contribute power plant location data. Using VENTUS, students view scenes in the vicinity of reported power plant coordinates on Google Maps. Students either verify the location of a power plant or search for it within a designated radius using various indicators, an e-guide, and a power plant photo gallery for assistance. If the power plant cannot be found, students mark the plant as unverified. To assure quality for research use, the project contains multiple checkpoints and levels of review. While participating in meaningful research that directly benefits the EI research community, students are engaged in relevant science curricula designed to meet each grade level's Next Generation Science Standards. Students study energy, climate change, the atmosphere, and geographical information systems. The curricula is

  16. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  17. Project 2019 of Garona Nuclear power plant. First project to licensing renew more than 40 years in Spain

    International Nuclear Information System (INIS)

    Fernandez, R. A.; Torralbo, J. R.

    2004-01-01

    NUCLENOR has been developing lifetime management and modernisation activities at Santa Maria de Garona NPP since the end of the 80's and the plant is now in optimum technical conditions to continue in operation beyond its original lifetime planned in the design (40 years). In the USA, the country of origin of the project, a good number of power plants with a similar design, age and history to SMG are in the process of obtaining or have already obtained, a licensing extension of up to 60 years from the NRC. In Spain, the activities required for requesting a long-term operating licensing extension include the Ageing Assessment and Management of the plant systems, structures and components, in accordance with the american regulation 10CFR54, a Radiological Impact Study for the new operating period, and an Analysis of New Legislation, not included in the licensing bases and considered to be important to safety by the CSN. With a view to obtaining a renewal of the current operating permit for the period 2009-2019, NUCLENOR has launched the Proyecto 2019, which extends to technical and licensing aspects, as it involves all the company's personnel. (Author)

  18. Dustfall design of open coal yard in the power plant-a case study on the closed reconstruction project of coal storage yard in shengli power plant

    Science.gov (United States)

    Wang, Kunpeng; Ji, Weidong; Zhang, Feifei; Yu, Wei; Zheng, Runqing

    2018-02-01

    This thesis, based on the closed reconstruction project of the coal storage yard of Shengli Power Plant which is affiliated to Sinopec Shengli Petroleum Administration, first makes an analysis on the significance of current dustfall reconstruction of open coal yard, then summarizes the methods widely adopted in the dustfall of large-scale open coal storage yard of current thermal power plant as well as their advantages and disadvantages, and finally focuses on this project, aiming at providing some reference and assistance to the future closed reconstruction project of open coal storage yard in thermal power plant.

  19. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  20. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS. ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    International Nuclear Information System (INIS)

    Rutherford, W.W.; Geuther, W.J.; Strankman, M.R.; Conrad, E.A.; Rhoadarmer, D.D.; Black, D.M.; Pottmeyer, J.A.

    2009-01-01

    The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is

  1. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR; CONRAD EA; RHOADARMER DD; BLACK DM; POTTMEYER JA

    2009-04-29

    The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is

  2. Establishing the quality assurance programme for a nuclear power plant project

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide provides requirements, recommendations and illustrative examples for establishing the overall quality assurance programme, and its constituent programmes, for a nuclear power plant project. It also provides guidance on the planning and documenting of programme plans and actions that are intended to ensure the achievement of the appropriate quality throughout the design, procurement, manufacture, construction, commissioning, operation and decommissioning of the nuclear power plant. The provisions of this Safety Guide are applicable to all organizations performing activities affecting the quality of items important to safety, such as designing, purchasing, fabricating, manufacturing, handling, shipping, storing, cleaning, erecting, installing, testing, commissioning, operating, inspecting, maintaining, repairing, refuelling, modifying and decommissioning

  3. 77 FR 12002 - Mount Baker-Snoqualmie National Forest Site-Specific Invasive Plant Treatment Project and Forest...

    Science.gov (United States)

    2012-02-28

    ... Invasive Plant Treatment Project and Forest Plan Amendment Number 28 AGENCY: Forest Service, USDA. ACTION... Forest. The current Forest-wide treatment approach pre-dates the Pacific Northwest Region Invasive Plant... interdisciplinary analysis: (1) Whether or not to authorize site- specific invasive plant treatments using...

  4. Fiscal 1998 research report. Research on the possibility of promoting CDM project through technology transfer with plant exports; 1998 nendo chosa hokokusho. Plant yushutsugata gijutsu iten wo tsujita CDM project suishin kanosei ni kansuru chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Study was made on promotion of CDM (clean development mechanism) project through technology transfer with plant exports. Although CDM system was provided in COP3 on climate change held in Kyoto in 1997, its detailed rules including project approval are yet undecided, and only the schedule to provide the detailed rules until COP6 in 2000 was decided in COP4 in 1998. The common recognition that the CDM project with plant exports produces various merits for both Japan and the partner country is increasing. However, from the viewpoint of forming concrete CDM projects, most Japanese enterprises are passive in approach to the CDM project because of no detailed design of CDM, uncertain profitability and procedures, and avoidance of additional burdens. Plant export is also difficult because of the fact that assessment of a new project is difficult. Enterprises' deeper recognition on the CDM project, and a governmental integrated support system are desirable. (NEDO)

  5. Project C-018H, 242-A Evaporator/PUREX Plant Process Condensate Treatment Facility, functional design criteria. Revision 3

    International Nuclear Information System (INIS)

    Sullivan, N.

    1995-01-01

    This document provides the Functional Design Criteria (FDC) for Project C-018H, the 242-A Evaporator and Plutonium-Uranium Extraction (PUREX) Plant Condensate Treatment Facility (Also referred to as the 200 Area Effluent Treatment Facility [ETF]). The project will provide the facilities to treat and dispose of the 242-A Evaporator process condensate (PC), the Plutonium-Uranium Extraction (PUREX) Plant process condensate (PDD), and the PUREX Plant ammonia scrubber distillate (ASD)

  6. Strategically oriented project management of the decommissioning of nuclear power plants; Strategieorientiertes Projektmanagement der Stilllegung von Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Kemmeter, Sascha [Conscore GmbH, Duesseldorf (Germany); Woempener, Andreas [Duisburg-Essen Univ., Duisburg (Germany). Lehrstuhl fuer ABWL und Controlling

    2013-12-15

    Due to the politically induced change of the energy sector in Germany, the operators of nuclear power plants had to react and to deal with completely new conditions concerning the decommissioning of their plants on short notice. Therefore the operators have to devise new strategies for controlling their decommissioning and dismantling projects in a short amount of time and most often similarly for several plants. Two fundamental procedures are possible for the successful controlling of these dismantling projects: a centralized or a decentralized management organization. How these project control processes can be realized in an optimal way, is, next to other economic specifications of the dismantling of nuclear power plants, the topic of a new research project of the Chair of Management Accounting at the University Duisburg-Essen. In that process, results and experiences from other research and practical projects concerning general large-scale projects are being used. Selected findings have been compiled and are being discussed in this paper. (orig.)

  7. The reliability evaluation of reclaimed water reused in power plant project

    Science.gov (United States)

    Yang, Jie; Jia, Ru-sheng; Gao, Yu-lan; Wang, Wan-fen; Cao, Peng-qiang

    2017-12-01

    The reuse of reclaimed water has become one of the important measures to solve the shortage of water resources in many cities, But there is no unified way to evaluate the engineering. Concerning this issue, it took Wanneng power plant project in Huai city as a example, analyzed the reliability of wastewater reuse from the aspects of quality in reclaimed water, water quality of sewage plant, the present sewage quantity in the city and forecast of reclaimed water yield, in particular, it was necessary to make a correction to the actual operation flow rate of the sewage plant. the results showed that on the context of the fluctuation of inlet water quality, the outlet water quality of sewage treatment plants is basically stable, and it can meet the requirement of circulating cooling water, but suspended solids(SS) and total hardness in boiler water exceed the limit, and some advanced treatment should be carried out. In addition, the total sewage discharge will reach 13.91×104m3/d and 14.21×104m3/d respectively in the two planning level years of the project. They are greater than the normal collection capacity of the sewage system which is 12.0×104 m3/d, and the reclaimed water yield can reach 10.74×104m3/d, which is greater than the actual needed quantity 8.25×104m3/d of the power plant, so the wastewater reuse of this sewage plant are feasible and reliable to the power plant in view of engineering.

  8. Projected impacts of climate change on regional capacities for global plant species richness.

    Science.gov (United States)

    Sommer, Jan Henning; Kreft, Holger; Kier, Gerold; Jetz, Walter; Mutke, Jens; Barthlott, Wilhelm

    2010-08-07

    Climate change represents a major challenge to the maintenance of global biodiversity. To date, the direction and magnitude of net changes in the global distribution of plant diversity remain elusive. We use the empirical multi-variate relationships between contemporary water-energy dynamics and other non-climatic predictor variables to model the regional capacity for plant species richness (CSR) and its projected future changes. We find that across all analysed Intergovernmental Panel on Climate Change emission scenarios, relative changes in CSR increase with increased projected temperature rise. Between now and 2100, global average CSR is projected to remain similar to today (+0.3%) under the optimistic B1/+1.8 degrees C scenario, but to decrease significantly (-9.4%) under the 'business as usual' A1FI/+4.0 degrees C scenario. Across all modelled scenarios, the magnitude and direction of CSR change are geographically highly non-uniform. While in most temperate and arctic regions, a CSR increase is expected, the projections indicate a strong decline in most tropical and subtropical regions. Countries least responsible for past and present greenhouse gas emissions are likely to incur disproportionately large future losses in CSR, whereas industrialized countries have projected moderate increases. Independent of direction, we infer that all changes in regional CSR will probably induce on-site species turnover and thereby be a threat to native floras.

  9. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs

  10. DSM energy saving pilot project report. Furniture Plant Teika, Riga, Latvia

    International Nuclear Information System (INIS)

    Ananevski, V.; Kalejs, M.; Hercogs, J.; Blumbergs, U.

    1995-07-01

    The purpose of this pilot project was to carry out energy audit into the furniture plant TEIKA and energy saving measures. Another aim was to transfer the Danish know how and experience obtained through the Danish effort in Latvian industries consumers. Therefore great attention is paid to energy mapping in order to show possibilities of the Danish methodisms. This report is a part of the Joint Latvian - Danish Project Demand Side Management and Energy Saving. It is a results of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and on the other hand a Danish team, which was represented by the Danish Power Consult company NESA. (EG)

  11. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  12. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  13. Providing more informative projections of climate change impact on plant distribution in a mountain environment

    Science.gov (United States)

    Randin, C.; Engler, R.; Pearman, P.; Vittoz, P.; Guisan, A.

    2007-12-01

    Due to their conic shape and the reduction of area with increasing elevation, mountain ecosystems were early identified as potentially very sensitive to global warming. Moreover, mountain systems may experience unprecedented rates of warming during the next century, two or three times higher than that records of the 20th century. In this context, species distribution models (SDM) have become important tools for rapid assessment of the impact of accelerated land use and climate change on the distribution plant species. In this study, we developed and tested new predictor variables for species distribution models (SDM), specific to current and future geographic projections of plant species in a mountain system, using the Western Swiss Alps as model region. Since meso- and micro-topography are relevant to explain geographic patterns of plant species in mountain environments, we assessed the effect of scale on predictor variables and geographic projections of SDM. We also developed a methodological framework of space-for-time evaluation to test the robustness of SDM when projected in a future changing climate. Finally, we used a cellular automaton to run dynamic simulations of plant migration under climate change in a mountain landscape, including realistic distance of seed dispersal. Results of future projections for the 21st century were also discussed in perspective of vegetation changes monitored during the 20th century. Overall, we showed in this study that, based on the most severe A1 climate change scenario and realistic dispersal simulations of plant dispersal, species extinctions in the Western Swiss Alps could affect nearly one third (28.5%) of the 284 species modeled by 2100. With the less severe B1 scenario, only 4.6% of species are predicted to become extinct. However, even with B1, 54% (153 species) may still loose more than 80% of their initial surface. Results of monitoring of past vegetation changes suggested that plant species can react quickly to the

  14. Experiences of success in industrial plants projects Experiencias exitosas en proyectos de plantas industriales

    Directory of Open Access Journals (Sweden)

    Nuria Forcada

    2008-08-01

    Full Text Available Success has always been the ultimate goal of construction projects, and different researchers have tried to evaluate it using different factors. Although specialized industrial construction usually involves very large scale projects with a high degree of technological complexity, research has mostly focused on civil and residential success factors. Experiences in Industrial Plants projects can help to improve project management and productivity in such a specialized sector. In this kind of projects, the contractual arrangement is one of the core differences on Project management and thus project success. This research seeks to develop a schema for classifying critical success factors as well as a methodology for evaluating projects. This methodology was adopted to evaluate critical success factors in Industrial Plants projects with different contractual arrangements. Findings suggest that although the construction stage has been the focus of many studies, the first stages are decisive for the success of projects; contract construction projects consider project planning to be more important; lump sum contract construction projects give greater importance to monitoring the benefits; bidding competition projects consider the available technology with greater rigor, etc. The results indicate that different Industrial Plants projects involve different success factors and management characteristics to achieve project objectives.En cualquier proyecto de construcción el principal objetivo es que sea exitoso y por lo tanto a lo largo del tiempo diferentes investigadores han tratado de evaluar los factores que influyen en el éxito de proyectos. En el ámbito de la construcción estas investigaciones se han enfocado principalmente a obras civiles y residenciales. Este artículo muestra resultados que provienen de proyectos de construcción industrial especializada que incluyen proyectos de gran escala con un alto grado de complejidad tecnol

  15. Dose-projection considerations for emergency conditions at nuclear power plants

    International Nuclear Information System (INIS)

    Stoetzel, G.A.; Ramsdell, J.V.; Poeton, R.W.; Powell, D.C.; Desrosiers, A.E.

    1983-05-01

    The purpose of this report is to review the problems and issues associated with making environmental radiation-dose projections during emergencies at nuclear power plants. The review is divided into three areas: source-term development, characterization of atmospheric dispersion and selection of appropriate dispersion models, and development of dosimetry calculations for determining thyroid dose and whole-body dose for ground-level and elevated releases. A discussion of uncertainties associated with these areas is also provided

  16. RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Buck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic, M.

    2004-01-01

    In the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: - development (RTD); - demonstration (DEMO): - thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: - identification of critical components; - application of a multilevel risk analysis (...from 'screening' to 'detailed analysis'); - determination of PoF (Probability of Failure); - determination of CoF (Consequence of Failure); - optimation of inspection and maintenance plan. From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only 1 for the detailed analysis (probabilistic high temperature fracture mechanics)

  17. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  18. Dose-projection considerations for emergency conditions at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stoetzel, G.A.; Ramsdell, J.V.; Poeton, R.W.; Powell, D.C.; Desrosiers, A.E.

    1983-05-01

    The purpose of this report is to review the problems and issues associated with making environmental radiation-dose projections during emergencies at nuclear power plants. The review is divided into three areas: source-term development, characterization of atmospheric dispersion and selection of appropriate dispersion models, and development of dosimetry calculations for determining thyroid dose and whole-body dose for ground-level and elevated releases. A discussion of uncertainties associated with these areas is also provided.

  19. North Plant co-generation project for South Davis County Sewer Improvement District

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, L.S. [Aqua Environmental Services, Inc., Bountiful, UT (United States)

    1993-12-31

    In the summer of 1988, the South Davis County Sewer Improvement District (SDCSID) learned of a grant/loan program being administered by the Utah State Department of Energy(DOE) for projects that demonstrate new and innovative ways of conserving energy or utilizing renewable energy sources. The SDCSID applied for and received from the DOE both a grant and a no-interest loan to finance half of the cost of a co-generation project at the North Wastewater Treatment Plant. This co-generation project utilizes methane gas, a by-product of the anaerobic digestion process, to generate both electricity and heat that is used at the plant. The SDCSID calculated that at the current anaerobic gas production rate, a 140 KW engine generator could be run almost 24 hours a day. Approximately 75% of the current electrical needs at the North Plant are supplied by the 140 KW engine generator. Also, all of the heat necessary to raise the temperature of the incoming sludge to 95{degrees}F, and to heat four large buildings is supplied from the heat recovery system of the engine. The system utilizes an induction type generator to supply electricity, which is somewhat simpler to design and less expensive to install than a synchronous type system. An induction system utilizes the Electrical Utility`s incoming power to excite the generator to correct the phase so that is can be used by the loads in the plant. In addition, the SDCSID installed a second identical engine generator as a back-up and to peak shave. Plant effluent is used to cool the engines instead of air-cooling through radiators.

  20. Judy Collins and First Lady Hillary Clinton await the launch of STS-93

    Science.gov (United States)

    1999-01-01

    Singer Judy Collins (left) and First Lady Hillary Rodham Clinton await the launch of Space Shuttle mission STS-93 in the Apollo/Saturn V Facility. Liftoff is scheduled for 12:36 a.m. EDT July 20. Much attention has been generated over the launch due to Commander Eileen M. Collins, the first woman to serve as commander of a Shuttle mission. Judy Collins has honored the commander with a song, 'Beyond the Sky,' which was commissioned by NASA through the NASA Art Program.

  1. NEOLITHIC PLANT USE IN THE WESTERN MEDITERRANEAN REGION: PRELIMINARY RESULTS FROM THE AGRIWESTMED PROJECT

    Directory of Open Access Journals (Sweden)

    L. Peña-Chocarro

    2013-04-01

    Full Text Available This contribution focuses on the preliminary results of the AGRIWESTMED project which focuses on the archaeobotanical analyses of early Neolithic sites in the western Mediterranean region (both in Iberia and in northern Morocco. A large number of sites has been studied producing an interesting dataset of plant remains which places the earliest examples of domesticated plants in the second half of the 6th millennium cal BC. Plant diversity is high as it is shown by the large number of species represented: hulled and naked wheats, barley, peas, fava beans, vetches, lentils and grass peas. To more crops, poppy and flax, are also part of the first agricultural crops of the area. Although agriculture seems to occupy a first place in the production of food, gathering is well represented in the Moroccan sites where a large number of species has been identified. 

  2. New power plants in Europe? A challenge for project and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Hartung, M. [RWE Technology GmbH, Essen (Germany)

    2010-07-01

    Against the backdrop of the age structure of the European power plant fleet and the EU's climate protection targets, a significant need for new-build and replacement power plant capacity is becoming apparent. RWE has thus founded RWE Technology in order to achieve its growth targets, but also to implement its ongoing power plant new-build programme in the order of no fewer than 12,000 MW in capacity. This company combines the project management and engineering capacity of the Group in order to meet the challenges posed by the fast-changing energy market. The following article explains the specific steps taken to achieve these objectives. (orig.)

  3. MITI project on advanced man-machine system for nuclear power plants

    International Nuclear Information System (INIS)

    Kato, Kanji; Watanabe, Takao; Hayakawa, Hiroyasu; Naito, Norio; Masui, Takao; Ogino, Takamichi.

    1988-01-01

    A computerized operator support system (COSS) against abnormal plant conditions was developed as a five-year project from 1980 to 1984, under the sponsorship of the Ministry of International Trade and Industry. The main purpose of the COSS development was to implement the lessons learned from the Three Mile Island accident. The main nuclear industries in Japan participated in the project. The design concept of the operator support functions and the method to implement it were established, and the prototype systems of the COSS for BWR and PWR plants were developed. After the completion of the COSS development, the above participant group once again joined for the work on an advanced man-machine system for nuclear power plants (MMS-NPP). This eight-year project aims at realizing an advanced operator support system by applying artificial intelligence, especially knowledge engineering, and sophisticated man-machine interface devices. Its main objectives are shown. This system configuration, operating method decision system, man-machine communication system, operation and maintenance support functions and so on are described. (Kako, I.)

  4. 3D digital dynamic management of maintenance projects for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Baizhong; Luo Yalin; Fang Hao; Ma Li; Zhang Jie; Wang Ruobing; Xie Min

    2005-01-01

    The whole process for the application of digital plant technique in the equipment transport in reactor building and the dynamic management of the spatial arrangement in Daya Bay Nuclear Power Station was introduced in the paper. The establishment of 3D digital Daya Bay plant, and the method and procedure to apply it in the nuclear power plant maintenance project have been discussed. This project utilizes the outer database to preserve the maintenance status of equipments, and avoids the damage or changing of the original 3D final model. Based on the maintenance procedure, the spatial arrangement and schedule for the maintenance of nuclear power station have been simulated and optimized for the whole process. This technique can simulate and optimize the arrangement and spatial arrangement for maintenance in limited space. It has been applied successfully in the reactor vessel head replacement for Unit 2 of Daya Bay NPP to shorten the time for key routes and the total time of this project by 16 hours and 92.5 hours, respectively. (author)

  5. Implementation of the project of equipment reliability in the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Rios O, J. E.; Martinez L, A. G.

    2008-01-01

    A equipment is reliable if it fulfills the function for which was designed and when it is required. To implement a project of reliability in a nuclear power plant this associate to a process of continuous analysis of the operation, of the conditions and faults of the equipment. The analysis of the operation of a system, of the equipment of the same faults and the parts that integrate to equipment take to identify the potential causes of faults. The predictive analysis on components and equipment allow to rectify and to establish guides to optimize the maintenance and to guarantee the reliability and function of the same ones. The reliability in the equipment is without place to doubts a wide project that embraces from the more small component of the equipment going by the proof of the parts of reserve, the operation conditions until the operative techniques of analysis. Without place of doubt for a nuclear power plant the taking of decisions based on the reliability of their systems and equipment will be the appropriate for to assure the operation and reliability of the same one. In this work would appear the project of reliability its processes, criteria, indicators action of improvement and the interaction of the different disciplines from the Nuclear Power Plant of Laguna Verde like a fundamental point for it put in operation. (Author)

  6. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  7. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase)

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  8. Beyond ectomycorrhizal bipartite networks: projected networks demonstrate contrasted patterns between early- and late-successional plants in Corsica.

    Directory of Open Access Journals (Sweden)

    Adrien eTaudiere

    2015-10-01

    Full Text Available The ectomycorrhizal (ECM symbiosis connects mutualistic plants and fungal species into bipartite networks. While links between one focal ECM plant and its fungal symbionts have been widely documented, systemic views of ECM networks are lacking, in particular, concerning the ability of fungal species to mediate indirect ecological interactions between ECM plant species (projected-ECM networks. We assembled a large dataset of plant-fungi associations at the species level and at the scale of Corsica using molecular data and unambiguously host-assigned records to: (i examine the correlation between the number of fungal symbionts of a plant species and the average specialization of these fungal species, (ii explore the structure of the plant-plant projected network and (iii compare plant association patterns in regard to their position along the ecological succession. Our analysis reveals no trade-off between specialization of plants and specialization of their partners and a saturation of the plant projected network. Moreover, there is a significantly lower-than-expected sharing of partners between early- and late-successional plant species, with fewer fungal partners for early-successional ones and similar average specialization of symbionts of early- and late-successional plants. Our work paves the way for ecological readings of Mediterranean landscapes that include the astonishing diversity of below-ground interactions.

  9. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  10. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  11. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Felise, P.; Phillips, J.D.

    1994-10-17

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice.

  12. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    International Nuclear Information System (INIS)

    Felise, P.; Phillips, J.D.

    1994-01-01

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice

  13. Percutaneous laser ablation of hepatocellular carcinoma in patients with liver cirrhosis awaiting liver transplantation

    International Nuclear Information System (INIS)

    Pompili, Maurizio; Pacella, Claudio Maurizio; Francica, Giampiero; Angelico, Mario; Tisone, Giuseppe; Craboledda, Paolo; Nicolardi, Erica; Rapaccini, Gian Ludovico; Gasbarrini, Giovanni

    2010-01-01

    Objective: The aim of this study was to determine the effectiveness and safety of percutaneous laser ablation for the treatment of cirrhotic patients with hepatocellular carcinoma awaiting liver transplantation. Materials and methods: The data of 9 male cirrhotic patients (mean age 50 years, range 45-60 years) with 12 biopsy proven nodules of hepatocellular carcinoma (mean diameter 2.0 cm, range 1.0-3.0 cm) treated by laser ablation before liver transplantation between June 2000 and January 2006 were retrospectively reviewed. Laser ablation was carried out by inserting 300 nm optical fibers through 21-Gauge needles (from two to four) positioned under ultrasound guidance into the target lesions. A continuous wave Neodymium:Yttrium Aluminium Garnet laser was used. Transarterial chemoembolization prior to liver transplantation was performed in two incompletely ablated tumors. Results: No procedure-related major complications were recorded. During the waiting time to liver transplantation local tumor progression after ablation occurred in 3 nodules (25%). At histological examination of the explanted livers complete necrosis was found in 8 nodules (66.7%, all treated exclusively with laser ablation), partial necrosis >50% in 3 nodules (25%), and partial necrosis <50% in 1 nodule. Conclusion: In patients with cirrhotic livers awaiting liver transplantation, percutaneous laser ablation is safe and effective for the management of small hepatocellular carcinoma.

  14. Intelligent and interactive computer image of a nuclear power plant: The ImagIn project

    International Nuclear Information System (INIS)

    Haubensack, D.; Malvache, P.; Valleix, P.

    1998-01-01

    The ImagIn project consists in a method and a set of computer tools apt to bring perceptible and assessable improvements in the operational safety of a nuclear plant. Its aim is to design an information system that would maintain a highly detailed computerized representation of a nuclear plant in its initial state and throughout its in-service life. It is not a tool to drive or help driving the nuclear plant, but a tool that manages concurrent operations that modify the plant configuration in a very general was (maintenance for example). The configuration of the plant, as well as rules and constraints about it, are described in a object-oriented knowledge database, which is built using a generic ImagIn meta-model based on the semantical network theory. An inference engine works on this database and is connected to reality through interfaces to operators and captors on the installation; it verifies constantly in real-time the consistency of the database according to its inner rules, and reports eventual problems to concerned operators. A special effort is made on interfaces to provide natural and intuitive tools (using virtual reality, natural language, voice recognition and synthesis). A laboratory application on a fictive but realistic installation already exists and is used to simulate various tests and scenarii. A real application is being constructed on Siloe, an experimental reactor of the CEA. (author)

  15. International outage coding system for nuclear power plants. Results of a co-ordinated research project

    International Nuclear Information System (INIS)

    2004-05-01

    The experience obtained in each individual plant constitutes the most relevant source of information for improving its performance. However, experience of the level of the utility, country and worldwide is also extremely valuable, because there are limitations to what can be learned from in-house experience. But learning from the experience of others is admittedly difficult, if the information is not harmonized. Therefore, such systems should be standardized and applicable to all types of reactors satisfying the needs of the broad set of nuclear power plant operators worldwide and allowing experience to be shared internationally. To cope with the considerable amount of information gathered from nuclear power plants worldwide, it is necessary to codify the information facilitating the identification of causes of outages, systems or component failures. Therefore, the IAEA established a sponsored Co-ordinated Research Project (CRP) on the International Outage Coding System to develop a general, internationally applicable system of coding nuclear power plant outages, providing worldwide nuclear utilities with a standardized tool for reporting outage information. This TECDOC summarizes the results of this CRP and provides information for transformation of the historical outage data into the new coding system, taking into consideration the existing systems for coding nuclear power plant events (WANO, IAEA-IRS and IAEA PRIS) but avoiding duplication of efforts to the maximum possible extent

  16. New concept for condition management of plants as a result of the KUNTO project. New operations approach reduces costs

    Energy Technology Data Exchange (ETDEWEB)

    McNiven, U.; Tamminen, L.

    1998-07-01

    IVO Generation Services Ltd. has carried out a project at the IVO Naantali power plant to develop the plants condition management. The project defines critical and monitored components for each system. In addition, recommendations for further action, investment proposals and suggestions for changes in maintenance and operations practices were supplied for the various systems in the plant. The systematic approach which was the result of the projects integrated into maintenance and operations practices where data collection and analysis is part of the routine. Up-to-date data is utilized in focusing maintenance and investments, in planning and reporting functions

  17. Decommissioning the Belgonucleaire Dessel MOX plant: presentation of the project and situation end august 2013

    Energy Technology Data Exchange (ETDEWEB)

    Cuchet, J.M. [TRACTEBEL ENGINEERING, Avenue Ariane, 7, B1200 Brussels (Belgium); Libon, H.; Verheyen, C. [BELGONUCLEAIRE S.A. / N.V. Europalaan, 20, B2480 Dessel (Belgium); Bily, J. [STUDSVIK GmbH, Karlsruher Strasse, 20, D75179 Pforzheim,(Germany); Boden, S. [SCK-CEN, Boeretang, 200, B2400 Mol (Belgium); Joffroy, F. [TECNUBEL N.V., Zandbergen, 1, B2480 Dessel (Belgium); Walthery, R. [BELGOPROCESS, Gravenstraat, 73, B2480 Dessel (Belgium)

    2013-07-01

    Belgonucleaire has been operating the Dessel MOX plant at an industrial scale between 1986 and 2006. During this period, 40 metric tons of plutonium (HM) have been processed into 90 reloads of MOX fuel for commercial light water reactors. The decision to stop the production in 2006 and to decommission the MOX plant was the result of the shrinkage of the MOX fuel market due to political and commercial factors. As a significant part of the decommissioning project of the Dessel MOX plant, about 170 medium-sized glove-boxes and about 1.200 metric tons of structure and equipment outside the glove-boxes are planned for dismantling. The license for the dismantling of the MOX plant was granted by Royal Decree in 2008 and the dismantling started in March 2009. The dismantling works are carried out by an integrated organization under leadership and responsibility of Belgonucleaire; this organization includes 3 main contractors, namely Tecnubel N.V., the THV ('Tijdelijke HandelsVereniging') Belgoprocess / SCK-CEN and Studsvik GmbH and Tractebel Engineering as project manager. In this paper, after having described the main characteristics of the project, the authors review the different organizational and technical options considered for the decommissioning of the glove-boxes; thereafter the main decision criteria (qualification of personnel and of processes, confinement, cutting techniques and radiation protection, safety aspects, alpha-bearing waste management) are analyzed as well. Finally the progress, the feedback and the lessons learned at the end of August 2013 are presented, giving the principal's and contractors point of view. (authors)

  18. Baseline survey for rare plant species and native plant communities within the Kamehameha Schools 'Lupea Safe Harbor Planning Project Area, North Kona District, Island of Hawai'i

    Science.gov (United States)

    Jacobi, James; Warshauer, F. R.; Price, Jonathan

    2010-01-01

    Kamehameha Schools, in conjunction with several federal, state, and private organizations, has proposed to conduct conservation management on approximately 5,340 ha (~13,200 acres) of land they own in the vicinity of Kīpukalupea in the North Kona District on the island of Hawai'i. The goal of this program is to restore and enhance the habitat to benefit native plant and animal populations that are currently, or were formerly, found in this site. The initial phase of this project has been focused on various activities including conducting baseline surveys for bird and plant species so Kamehameha Schools could develop a Safe Harbor Agreement (SHA) for the proposed project lands relative to the habitat management and species reintroduction efforts they would like to conduct in the Lupea Project area. This report summarizes methods that were used to collect field data on plant species and communities within the project area, and the results of that initial survey. The information was used to calculate baseline values for all listed threatened or endangered plant species found, or expected to be found, within the project area, and to design a monitoring program to assess changes in plant communities and rare plant species relative to management activities over the duration of the SHA.

  19. IAEA TC Project 'Strengthening safety and reliability of fuel and materials in nuclear power plants'

    International Nuclear Information System (INIS)

    Makihara, Y.

    2008-01-01

    The Regional TC Project in Europe RER9076 'Strengthening Safety and Reliability of Fuel and Materials in Nuclear Power Plants' was launched in 2003 as a four-year project and was subsequently extended in 2006 to run through 2008. The purpose of the Project is to support the Central and Eastern European countries with the necessary tools to fulfill their own fuel and material licensing needs. The main objective will be to provide quality data on fuel and materials irradiated in power reactors and in dedicated experiments carried out in material test reactors (MTRs). Within the framework of the Project, ten tasks were implemented. These included experiments performed at the test facilities in the region, training courses and workshops related to fuel safety. While several tasks are expected to be completed by the end of RER9076, some remain. It would be desirable to initiate a new RER Project from the next TC cycle (2009-2011) in order to take over RER9076 and to implement new tasks required for enhancing fuel safety in the region. (author)

  20. The development of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) offers a perspective on the value of designing flexibility into a public affairs program to enable it to grow with and complement a project's evolution from construction through to operations. This paper discusses how the WIPP public affairs program progressed through several stages to its present scope. During the WIPP construction phase, the public affairs program laid a foundation for Project acceptance in the community. A speaker's bureau, a visitors program, and various community outreach and support programs emphasized the educational and socioeconomic benefits of having this controversial project in Carlsbad. Then, in this past year as the project entered a preoperational status, the public affairs program emphasis shifted to broaden the positive image that had been created locally. In this stage, the program promoted the project's positive elements with the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management and transportation program. Currently, an even broader, more aggressive public affairs program is planned. During this stage public affairs will be engaged in a comprehensive institutional and outreach program, explaining and supporting WIPP's mission in each of the communities and agencies affected by the operation of the country's first geologic repository

  1. Software and man-machine interface considerations for a nuclear plant computer replacement and upgrade project

    International Nuclear Information System (INIS)

    Diamond, G.; Robinson, E.

    1984-01-01

    Some of the key software functions and Man-Machine Interface considerations in a computer replacement and upgrade project for a nuclear power plant are described. The project involves the installation of two separate computer systems: an Emergency Response Facilities Computer System (ERFCS) and a Plant Process Computer System (PPCS). These systems employ state-of-the-art computer hardware and software. The ERFCS is a new system intended to provide enhanced functions to meet NRC post-TMI guidelines. The PPCS is intended to replace and upgrade an existing obsolete plant computer system. A general overview of the hardware and software aspects of the replacement and upgrade is presented. The work done to develop the upgraded Man-Machine Interface is described. For the ERFCS, a detailed discussion is presented of the work done to develop logic to evaluate the readiness and performance of safety systems and their supporting functions. The Man-Machine Interface considerations of reporting readiness and performance to the operator are discussed. Finally, the considerations involved in the implementation of this logic in real-time software are discussed.. For the PPCS, a detailed discussion is presented of some new features

  2. The role of instrumentation and control systems in power uprating projects for nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The IAEA's activities in nuclear power plant operating performance and life cycle management are aimed at increasing Member State capabilities in utilizing good engineering and management practices developed and transferred by the IAEA. In particular, the IAEA supports activities focusing on the improvement of nuclear power plant (NPP) performance, plant life management, training, power uprating, operational licence renewal, and the modernization of instrumentation and control (I and C) systems of NPPs in Member States. The subject of the I and C systems' role in power uprating projects in NPPs was suggested by the Technical Working Group on Nuclear Power Plant Control and Instrumentation in 2003. The subject was then approved by the IAEA and included in the programmes for 2004-2007. The increasing importance of power uprating projects can be attributed to the general worldwide tendency to the deregulation of the electricity market. The greater demand for electricity and the available capacity and safety margins, as well as the pressure from several operating NPPs resulted in requests for licence modification to enable operation at a higher power level, beyond the original licence provisions. A number of nuclear utilities have already gone through the uprating process for their nuclear reactors, and many more are planning to go through this modification process. In addition to mechanical and process equipment changes, parts of the electrical and I and C systems and components may also need to be altered to accommodate the new operating conditions and safety limits. This report addresses the role of I and C systems in NPP power uprating projects. The objective of the report is to provide guidance to utilities, safety analysts, regulators and others involved in the preparation, implementation and licensing of power uprating projects, with particular emphasis on the I and C aspects of these projects. As the average age of NPPs is increasing, it is becoming common for

  3. Data base on dose reduction research projects for nuclear power plants

    International Nuclear Information System (INIS)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K.

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report

  4. Data base on dose reduction research projects for nuclear power plants. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K. [Brookhaven National Lab., Upton, NY (United States)

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report.

  5. Engineering and training simulators: A combined approach for nuclear plant construction projects

    International Nuclear Information System (INIS)

    Harnois, Olivier; Gain, Pascal; Bartak, Jan; Gathmann, Ralf

    2007-01-01

    Full text: Simulation technologies have always been widely used on nuclear applications, but with a clear division between engineering application, using highly validated code run in batch mode, and training purpose where real time computation is a mandatory requirement. Thanks to the flexibility of modern simulation technology and the increased performance of computers, it becomes now possible to develop Nuclear Power plant simulators that can be used both for engineering and training purposes. In the last years, the revival of nuclear industry raised a number of new construction or plant finishing projects in which the application of this combined approach would result in decisive improvement on plant construction lead times, better project control and cost optimizations. The simulator development is to be executed in a step-wise approach, scheduled in parallel with the plant design and construction phases. During a first step, the simulator will model the plant nuclear island systems plus the corresponding instrumentation and control, specific malfunctions and local commands. It can then be used for engineering activities defining and validating the plant operating strategies in case of incidents or accidents. The Simulator executive Station and Operator Station will be in prototype version with an interface imagery enabling monitoring and control of the simulator. Availability of such simulation platform leads to a significant increase in efficiency of the engineering works, the possibility to validate basic design hypotheses and detect defects and conflicts early. The second phase will consist in the fully detailed simulation of Main Control Room plant supervision and control MMI, taking into account I and C control loops detailed design improvement, while having sufficient fidelity in order to be suitable for the future operator training. Its use will enable the engineering units not only to specify and validate normal, incident and accident detailed plant

  6. Development of absolute radiometric response functions for HyPlant & G-LiHT using SIRCUS Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The goal of this project is to provide absolute radiometric and cross-calibrated spectral characterizations for G-LiHT and HyPlant.  The objectives are: (i) to...

  7. A continuum of research projects to improve extraction of oil and proteins in oilseed plants

    Directory of Open Access Journals (Sweden)

    Miquel Martine

    2011-05-01

    Full Text Available A key challenge in the actual context of fossil sources rarefaction, global warming, and of increase of the world global population, is to promote the use of molecules derived from renewable sources such as plants. Among these molecules, lipids and proteins are targets of interest. Plant lipids from oilseeds are attractive substitutes to the use of fossil oil. Till the beginning of the 20th century, numerous products used in the daily life were derived from natural renewable products. For instance, plant oil was commonly used as fuel for vehicles and was entering in the composition of paintings, lubricants etc. Unfortunately, natural oils have been progressively replaced by cheaper fossil oil in the fabrication of these products. Nowadays, fossil oils are becoming increasingly expensive being a finite comodity. It is thus important to reduce our dependence from fossil oil and develop substitution industries. Oilseeds contain important amounts of proteins which are mainly used in feed. As several kilograms of plant protein are needed to obtain one kilogram of animal protein, the interest toward using plant protein in food is reinforced. The developments of the use of plant lipids, as well as proteins are a major stakes for the competitiveness of European agriculture and industry, as well as for sustainable development. Extraction of oil and proteins from rapeseed has a significant cost, in term of energy and solvent uses, and finally affects the ultimate quality of the products (protein digestibility. In order to quantitatively extract seed reserves under mild conditions, it will be necessary to limit the amount of energy needed, and avoid any use of solvents. Ideally, seeds should be processed in a bio refinery. In this paper, we will describe how oilseeds store their reserves, and roadblocks for improving actual oilseed extraction processes. A continuum of research projects aimed at answering targeted questions will be presented, with selected

  8. Transmission avoided cost: a new parameter to evaluate the economic competitiveness of generations plants projects

    Energy Technology Data Exchange (ETDEWEB)

    Ramos, D S [Companhia Energetica de Sao Paulo, SP (Brazil); Albuquerque, J C.R.; Rosenblat, J [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The paper presents a new formulation that makes feasible a composition of long run production marginal costs with the long run transmission marginal costs, including the costs related to the interconnection EHV networks and that related to the voltage levels below. The goal top be attained is to have available a more adequate parameter in order to compare production cost related to a plant, that will be connected to a certain voltage level network, to the cost related supplying the sam,e amount of energy from the bulk power system which will be represented by the marginal costs up to the voltage level under consideration. This procedure brings to light the Transmission Avoided Costs concepts, that are stressed throughout the text. The proposed methodology is now being used, in the brazilian Power Sector, as a rule of thumb in order to guide planning decisions about the schedule of new plants that have installed capacity below 30 MW. For plants with higher capacity, the transmission avoided costs are evaluated for each specific case, simulating the system behavior without the quoted hydroelectric plant. This paper focuses, an an application example, the case of the Canoas Hydroelectric Project, recently included in the Generation Expansion Reference Plan after a detailed analysis supported by the methodology described here. (author) 7 refs., 3 tabs.

  9. The role of insurance and risk management in new power plant projects

    International Nuclear Information System (INIS)

    Ryan, R.

    1988-01-01

    Insurance, and other risk management techniques, can be used to facilitate the financing and construction of power plant projects. This paper describes certain techniques, then it concentrates on insurance based solutions. The objective of this paper is to point out how the insurance industry can help small power producers. First, the standard insurance coverages will be reviewed. Then coverages that have been specifically designed for the alternative energy, cogeneration and small power producing industries will be explained. Some real life examples will be discussed to show how the coverages really work

  10. Condensed listing of surface boreholes at the Waste Isolation Pilot Plant Project through 31 December 1995

    International Nuclear Information System (INIS)

    Hill, L.R.; Aguilar, R.; Mercer, J.W.; Newman, G.

    1997-01-01

    This report contains a condensed listing of Waste Isolation Pilot Plant (WIPP) project surface boreholes drilled for the purpose of site selection and characterization through 31 December 1995. The US Department of Energy (DOE) sponsored the drilling activities, which were conducted primarily by Sandia National Laboratories. The listing provides physical attributes such as location (township, range, section, and state-plane coordinates), elevation, and total borehole depth, as well as the purpose for the borehole, drilling dates, and information about extracted cores. The report also presents the hole status (plugged, testing, monitoring, etc.) and includes salient findings and references. Maps with borehole locations and times-of-drilling charts are included

  11. The Sydvaerme project: District heating from the Barsebeck nuclear power plant

    International Nuclear Information System (INIS)

    Josefsson, L.

    1977-01-01

    The paper presents a summary report of a study on district heating from Barsebeck Nuclear Power Plant in Sweden, prepared cooperatively by the cities of Malmoe, Lund, Helsingborg, Landskrona and the electric power company Sydkraft. A future number 3 generating set at the Barsebeck nuclear power station could be designed for combined production of heat and electric power. The generating set could be completed after 1983, and could then supply about 65% of total district heating requirements. The first stage of the investigation includes a proposal for a technically feasible solution, sufficiently detailed to permit both technical and economic evaluation of the project. (author)

  12. Cesium Ion Exchange Program at the Hanford River Protection Project Waste Treatment Plant

    International Nuclear Information System (INIS)

    CHARLES, NASH

    2004-01-01

    The River Protection Project - Hanford Tank Waste Treatment and Immobilization Plant will use cesium ion exchange to remove 137Cs from Low Activity Waste down to 0.3 Ci/m3 in the Immobilized LAW, ILAW product. The project baseline for cesium ion exchange is the elutable SuperLig, R, 644, SL-644, resin registered trademark of IBC Advanced Technologies, Inc., American Fork, UT or the Department of Energy approved equivalent. SL-644 is solely available through IBC Advanced Technologies. To provide an alternative to this sole-source resin supply, the RPP--WTP initiated a three-stage process for selection and qualification of an alternative ion exchange resin for cesium removal in the RPPWTP. It was recommended that resorcinol formaldehyde RF be pursued as a potential alternative to SL-644

  13. Personality factors versus expectations and self-reported symptoms among patients awaiting advanced prosthodontic treatment.

    Science.gov (United States)

    Hakestam, U; Söderfeldt, B; Rydén, O; Glantz, P O

    1997-09-01

    To assess simple questions for identifying patient personality traits among a normal Swedish population and to assess possible relationships between personality and symptoms, attitudes, dental problems, and received dental care, a questionnaire was sent to 489 subjects awaiting prosthodontic treatment (response rate 84.2%). Three personality traits could be identified: "Fearful-depressed" subjects consumed more tranquillisers, were worried and had many symptoms, whilst "Open-minded" were optimistic about treatment, had high expectations and few symptoms. "Control-minded" did not reveal worries and guarded their autonomy. It was concluded that personality indicators were related to clinically relevant factors: salience of teeth, perceptions of problems, dental attendance pattern, expectations and perceptions of symptoms.

  14. Chest computed tomography scores are predictive of survival in patients with cystic fibrosis awaiting lung transplantation

    DEFF Research Database (Denmark)

    Loeve, Martine; Hop, Wim C. J.; de Bruijne, Marleen

    2012-01-01

    Rationale: Up to a third of cystic fibrosis (CF) patients awaiting lung transplantation (LTX) die while waiting. Inclusion of computed tomography (CT) scores may improve survival prediction models such as the lung allocation score (LAS). Objectives: This study investigated the association between...... CT and survival in CF patients screened for LTX. Methods: Clinical data and chest CTs of 411 CF patients screened for LTX between 1990 and 2005 were collected from 17 centers. CTs were scored with the Severe Advanced Lung Disease (SALD) 4-category scoring system, including the components "infection....../inflammation" (INF), air trapping/hypoperfusion (AT), normal/hyperperfusion (NOR) and bulla/cysts (BUL). The volume of each component was computed using semi-automated software. Survival analysis included Kaplan-Meier curves, and Cox-regression models. Measurements and main results: 366 (186 males) out of 411...

  15. Considerations on safety against seismic excitations in the project of reactor auxiliary building and control building in nuclear power plants

    International Nuclear Information System (INIS)

    Santos, S.H.C.; Castro Monteiro, I. de

    1986-01-01

    The seismic requests to be considered in the project of main buildings of a nuclear power plant are discussed. The models for global seismic analysis of nuclear power plant structures, as well as models for global strength distribution are presented. The models for analysing reactor auxiliary building and control building, which together with the reactor building and turbine building form the main energy generation complex in a nuclear power plant, are described. (M.C.K.) [pt

  16. Sex Differences in Mortality Based on United Network for Organ Sharing Status While Awaiting Heart Transplantation.

    Science.gov (United States)

    Hsich, Eileen M; Blackstone, Eugene H; Thuita, Lucy; McNamara, Dennis M; Rogers, Joseph G; Ishwaran, Hemant; Schold, Jesse D

    2017-06-01

    There are sex differences in mortality while awaiting heart transplantation, and the reason remains unclear. We included all adults in the Scientific Registry of Transplant Recipients placed on the heart transplant active waitlist from 2004 to 2015. The primary end point was all-cause mortality. Multivariable Cox proportional hazards models were performed to evaluate survival by United Network for Organ Sharing (UNOS) status at the time of listing. Random survival forest was used to identify sex interactions for the competing risk of death and transplantation. There were 33 069 patients (25% women) awaiting heart transplantation. This cohort included 7681 UNOS status 1A (26% women), 13 027 UNOS status 1B (25% women), and 12 361 UNOS status 2 (26% women). During a median follow-up of 4.3 months, 1351 women and 4052 men died. After adjusting for >20 risk factors, female sex was associated with a significant risk of death among UNOS status 1A (adjusted hazard ratio, 1.14; 95% confidence interval, 1.01-1.29) and UNOS status 1B (adjusted hazard ratio, 1.17; 95% confidence interval, 1.05-1.30). In contrast, female sex was significantly protective for time to death among UNOS status 2 (adjusted hazard ratio, 0.85; 95% confidence interval, 0.76-0.95). Sex differences in probability of transplantation were present for every UNOS status, and >20 sex interactions were identified for mortality and transplantation. When stratified by initial UNOS status, women had a higher mortality than men as UNOS status 1 and a lower mortality as UNOS status 2. With >20 sex interactions for mortality and transplantation, further evaluation is warranted to form a more equitable allocation system. © 2017 American Heart Association, Inc.

  17. Data base on dose reduction research projects for nuclear power plants. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Vulin, D.S.; Liang, H.; Baum, J.W. [Brookhaven National Lab., Upton, NY (United States)

    1992-08-01

    This is the fourth volume in a series of reports that provide information on dose reduction research and health physics technology for nuclear power plants. The information is taken from a data base maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. This report presents information on 118 new or updated projects, covering a wide range of activities. Projects including steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section of the report. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Included in this volume is a detailed description of how to access the BNL data bases which store this information. All project abstracts from this report, as well as many other useful documents, can be accessed, with permission, through our on-line system, ACE. A computer equipped with a modem, or a fax machine is all that is required to connect to ACE. Many features of ACE, including software, hardware, and communications specifics, are explained in this report.

  18. Data base on dose reduction research projects for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Vulin, D.S.; Liang, H.; Baum, J.W. (Brookhaven National Lab., Upton, NY (United States))

    1992-08-01

    This is the fourth volume in a series of reports that provide information on dose reduction research and health physics technology for nuclear power plants. The information is taken from a data base maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. This report presents information on 118 new or updated projects, covering a wide range of activities. Projects including steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section of the report. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Included in this volume is a detailed description of how to access the BNL data bases which store this information. All project abstracts from this report, as well as many other useful documents, can be accessed, with permission, through our on-line system, ACE. A computer equipped with a modem, or a fax machine is all that is required to connect to ACE. Many features of ACE, including software, hardware, and communications specifics, are explained in this report.

  19. S.A.P. Students Adopt Plants: A Curriculum Guide for Independent Research Projects in High School Biology.

    Science.gov (United States)

    Wilkinson, Gayle A.

    This curriculum guide begins with classroom and text study of plants and develops into an individual research project that continues throughout the school year outside the regular biology or botany teaching plan and text. The project uses about one class period every 2 weeks for group discussions, evaluations, and suggestions for the individual…

  20. Pre-project study on a demonstration plant for seawater desalination using a nuclear heating reactor in Morocco

    International Nuclear Information System (INIS)

    Achour, M.

    2000-01-01

    This paper gives in the first part detailed information on the pre-project study on a demonstration plant for seawater desalination using heating reactor implemented by both Moroccan and Chinese sides. The main findings of the pre-project study are given in the second part. (author)

  1. PROJECT MANAGEMENT MATURITY: AN ASSESSMENT OF MATURITY FOR DEVELOPING PILOT PLANTS

    Directory of Open Access Journals (Sweden)

    H.K. Mittermaier

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Despite the current economic climate, the South African mining and engineering industry is experiencing a very promising future, with a large number of capital projects in the offing. It is inevitable that pilot plant development will form part of this future as a risk mitigation technique. This study found that, even though the terms ‘pilot plant’ and ‘project management maturity’ are familiar within the industry, no link between these two could be found in the literature. A number of maturity models exist; and one developed by PMSolutions was selected to perform an assessment of the current level of project management maturity within the South African mining and engineering industry pertaining to the development of pilot plants. The Delphi technique was used to determine the views of experts in the South African mining, mineral processing, petrochemical, nuclear, and mechanical sectors regarding this maturity. A significant difference was observed between the current level of maturity and the required level of maturity in all but one of the nine knowledge areas defined by the Project Management Institute. The two knowledge areas of project time and risk management showed significant differences between current and required maturity levels, and were identified as key areas for improvement.

    AFRIKAANSE OPSOMMING: Ten spyte van die huidige ekonomiese klimaat ondervind die Suid-Afrikaanse mynbou- en ingenieursbedryf ’n baie bemoedigende toekoms, met ’n groot aantal kapitaalprojekte in die vooruitsig. Ten einde risiko’s te verlaag, sal die ontwikkeling van loodsaanlegte noodwendig deel van hierdie toekoms uitmaak. Daar is gevind dat, alhoewel die terme ‘loodsaanleg’ en ‘projekbestuur volwassenheid’ in die nywerheid bekend is, geen skakeling van hierdie twee terme in die literatuur opgespoor kon word nie. ’n Aantal volwassenheid modelle bestaan; en een wat deur PMSolutions ontwikkel is, is gekies om

  2. Research and Development Technology Development Roadmaps for the Next Generation Nuclear Plant Project

    Energy Technology Data Exchange (ETDEWEB)

    Ian McKirdy

    2011-07-01

    The U.S. Department of Energy (DOE) has selected the high temperature gas-cooled reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for process heat, hydrogen and electricity production. The reactor will be graphite moderated with helium as the primary coolant and may be either prismatic or pebble-bed. Although, final design features have not yet been determined. Research and Development (R&D) activities are proceeding on those known plant systems to mature the technology, codify the materials for specific applications, and demonstrate the component and system viability in NGNP relevant and integrated environments. Collectively these R&D activities serve to reduce the project risk and enhance the probability of on-budget, on-schedule completion and NRC licensing. As the design progresses, in more detail, toward final design and approval for construction, selected components, which have not been used in a similar application, in a relevant environment nor integrated with other components and systems, must be tested to demonstrate viability at reduced scales and simulations prior to full scale operation. This report and its R&D TDRMs present the path forward and its significance in assuring technical readiness to perform the desired function by: Choreographing the integration between design and R&D activities; and proving selected design components in relevant applications.

  3. Tight integration of computerized procedures with plant information at the South Texas Project

    International Nuclear Information System (INIS)

    Brtis, J.S.; Green, T.

    1996-01-01

    This paper describes a unique undertaking that is underway at Houston Lighting and Power's South Texas Project (STP). The paper presents an information upgrade project that uses expert system technologies to computerize design change procedures and to tightly integrate the resulting on-line, interactive procedures with the on-line information that design change activities use and generate. This effort will show how procedure computerization can leverage the large investments in plant data. The expected benefits include reduced costs and improved quality of design change work, plus a significant reduction in the burden of configuration management that comes from design changes. Both process computerization and the integration of process with data are being implemented at STP. This work is part of a major migration of information from a mainframe to a LAN platform. This paper will be of greatest interest to those involved in: (1) configuration management, (2) coordinating information to support design change procedures, (3) plant information management, and (4) business process reengineering

  4. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    OpenAIRE

    Jovanović Filip P.; Berić Ivana M.; Jovanović Petar M.; Jovanović Aca D.

    2016-01-01

    This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reductio...

  5. Fuel Gas Demonstration Plant Program: Small-Scale Industrial Project. Environmental assessment statement

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    Solid, liquid, and gaseous by-products and wastes are generated during coal storage and processing, gasification, and gas cleanup. Recovery systems have been designed to collect and utilize by-products. Wastes will be placed in storage areas designed to prevent release of the materials to the environment. The coal gasification plant along with the solid waste disposal area will occupy approximately 115 acres. To prevent, to the fullest extent possible, degradation of groundwater and surface water resources, the coal stockpile, landfill, collection pond, settling basin, and drainage ditches will be constructed to prevent the seepage of potential contaminants into groundwater or the drainage of runoff into surface waters. Cooling water is the primary water requirement of the project. None of the water utilized in the gasification plant will be released into the area surface water system, but will be either recycled or directed into the settling basin. The gasification facility has the potential of emitting a broad spectrum of pollutants into the atmosphere. However, effective emission control procedures such as off-gas recycling, hydrogen sulfide removal, particulate removal, and flaring will be applied to minimize the plant's emissions. The necessity of monitoring the more exotic pollutants such as acid gases, trace elements, metal carbonyls, and a multitude of organic compounds, will be determined as the gasification facility becomes more of a reality and the latest literature and research developments can be surveyed to evaluate the emission rates, biological significance, and monitoring techniques for these pollutants.

  6. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition are all needed. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates and is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remediation activity. However, risks from all of the remediation activities, decontamination and decommissioning activities, and normal ongoing operations are imposed upon the Rocky Flats workers, the surrounding public, and the environment. Comparative Risk Analysis will provide risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures by focusing these resources on the largest risks first. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. The Comparative Risk Analysis methodology Group, consisting of community stakeholders, was established. Early stakeholder involvement in the risk analysis methodology development provides an opportunity for stakeholders to influence the risk information delivered to a decision-maker. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  7. Feasibility improvement project for the gas turbine power plant in Iran

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Investigations and discussions have been given on measures to improve energy conservation and efficiency at a power plant of Kish Water and Power Company (KWPC) in Iran. The site has high ambient temperature throughout a year, making the gas turbine power plant capable of generating power only at about 70% of the rated output, with the power generation efficiency decreasing. The project has analyzed the current situation at the plant, and evaluated different means that appear effective in improving the efficiency, including the gas turbine absorbed air cooling system, the steam injection system, and the combined cycle. As a result of the discussions, it was revealed that energy saving effect can be obtained at 145 TJ with the gas turbine absorbed air cooling system, 224 TJ with the steam injection system, and 1017 TJ with the combined cycle. The annual reduction of greenhouse gas emission due to the above energy conservation would be about 11 thousand tons, 16.5 thousand tons, and 75 thousand tons, respectively. However, the investment payback period would be about 2.45 years, 8.31 years, and 14.21 years, respectively. Therefore, the profitability does not appear very attractive because of low fuel unit cost. (NEDO)

  8. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  9. Country Report Summary: Japan [Project Management in Nuclear Power Plant Construction: Guidelines and Experience

    International Nuclear Information System (INIS)

    2012-01-01

    The Hokkaido Electric Power Company (HEPCO) is the owner of the Tomari NPP comprising three operating PWR units. The latest unit to be connected to the grid, Tomari Unit 3, is a 3-loop PWR power plant with an electric output of 912 MW(e) supplied by Mitsubishi Heavy Industries (MHI). This is the newest unit in HEPCO and it is the newest PWR unit in Japan as well. The first concrete at Tomari Unit 3 was poured at the end of summer in 2004. The unit entered into commercial operation in December 2009. The Tomari site is located on a northern Japanese island. It is battered by strong winds and receives much snow in the winter. Therefore, civil works and building construction were temporarily suspended every year from the beginning of December until the end of March. This increased construction duration by one year compared to other sites. Consequently from first concrete to the start of commercial operation construction at Tomari lasted 64 months. There are specific factors in the approach to construction of nuclear power plants in Japan. (1) Japanese legislation defines that the sole licensee must be the electric power company. This implies that the electric power company is responsible for the safety of the plant and in that capacity it must submit for approval the Safety Analysis Report (SAR) but it is also responsible for the design and reliability of the plant; hence it must also submit for approval the Construction Plan (CP), containing all necessary detailed design information. Consequently, the electric power company becomes the sole counterpart to the regulatory body on all aspects of the project. (2) All Japanese electric power companies are considerably large and have the tradition to do the engineering of their power plant themselves, and this not only for nuclear but also for conventional power plant. Therefore, the owner/utilities in Japan carry themselves the burden of major portions of the engineering, procurement and construction (EPC) of their NPPs

  10. Model for impact assessment in human factors engineering project of PWR plants with digital control

    International Nuclear Information System (INIS)

    Roedel, Frederico G.; Schirru, Roberto

    2017-01-01

    New nuclear power plants are being designed with the digital Instrumentation and Control (I and C) as the backbone for the functions of protection, control, monitoring and display and with digital Human-System Interface (HSI). In this new environment, rather than play physical control actions, the operators begin to act as decision makers and, within this context, the Human Factors Engineering (HFE) has become an integral part of the projects. As the operational experience with the use of digital I and C systems and HSI is limited since, besides the small number of applications, it is proprietary, the objective of this work is to carry out an assessment in order to identify the most relevant aspects of a digital HSI project. The proposed model is based on concepts of fuzzy logic, uses MATLAB for data processing, defines criteria for evaluation and quantification of impacts in the project and has been applied to the General Principles and the Guidelines presented in the NUREG-0700. The assessment indicated that the Guidelines for User-Interface Interaction and Management, for Information Display and for Computer-Based Procedures System should be carefully evaluated in the design of a digital HSI considering the new Users Tasks Demand, the Organization of HSI Elements and the Work Environment. (author)

  11. Model for impact assessment in human factors engineering project of PWR plants with digital control

    Energy Technology Data Exchange (ETDEWEB)

    Roedel, Frederico G.; Schirru, Roberto, E-mail: froedel@nuclear.ufrj.br, E-mail: schirru@lmp.ufrj.br [Coordenacao de Pos-Graduacao e Pesquisa de Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Departamento de Engenharia Nuclear

    2017-07-01

    New nuclear power plants are being designed with the digital Instrumentation and Control (I and C) as the backbone for the functions of protection, control, monitoring and display and with digital Human-System Interface (HSI). In this new environment, rather than play physical control actions, the operators begin to act as decision makers and, within this context, the Human Factors Engineering (HFE) has become an integral part of the projects. As the operational experience with the use of digital I and C systems and HSI is limited since, besides the small number of applications, it is proprietary, the objective of this work is to carry out an assessment in order to identify the most relevant aspects of a digital HSI project. The proposed model is based on concepts of fuzzy logic, uses MATLAB for data processing, defines criteria for evaluation and quantification of impacts in the project and has been applied to the General Principles and the Guidelines presented in the NUREG-0700. The assessment indicated that the Guidelines for User-Interface Interaction and Management, for Information Display and for Computer-Based Procedures System should be carefully evaluated in the design of a digital HSI considering the new Users Tasks Demand, the Organization of HSI Elements and the Work Environment. (author)

  12. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  13. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    International Nuclear Information System (INIS)

    Kosonen, M.; Hakola, M.

    2012-01-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  14. Development project HTR-electricity-generating plant, concept design of an advanced high-temperature reactor steam cycle plant with spherical fuel elements (HTR-K)

    International Nuclear Information System (INIS)

    1978-07-01

    The report gives a survey of the principal work which was necessary to define the design criteria, to determine the main design data, and to design the principal reactor components for a large steam cycle plant. It is the objective of the development project to establish a concept design of an edvanced steam cycle plant with a pebble bed reactor to permit a comparison with the direct-cycle-plant and to reach a decision on the concept of a future high-temperature nuclear power plant. It is tried to establish a largerly uniform basic concept of the nuclear heat-generating systems for the electricity-generating and the process heat plant. (orig.) [de

  15. Pain and Anxiety in Rural Acute Coronary Syndrome Patients Awaiting Diagnostic Cardiac Catheterization.

    Science.gov (United States)

    O'Keefe-McCarthy, Sheila; McGillion, Michael; Clarke, Sean P; McFetridge-Durdle, Judith

    2015-01-01

    In rural areas of Canada, people with acute coronary syndromes (ACS) can wait up to 32 hours for transfer for diagnostic cardiac catheterization (CATH). While awaiting CATH, it is critical that pain and anxiety management be optimal to preserve myocardial muscle and minimize the risk of further deterioration. The aim of this study was to examine the relationship between clinical management, cardiac pain intensity, and state anxiety for rural ACS patients awaiting diagnostic CATH. In a prospective, descriptive-correlational repeated-measures design involving 121 ACS rural patients, we examined the associations of analgesic and nitroglycerin administration with cardiac pain intensity (numeric rating scale) and state anxiety (Spielberger State Anxiety Inventory) and also nurses' pain knowledge and attitudes (Toronto Pain Management Inventory-ACS Version and Knowledge and Attitudes Survey Regarding Pain) using linear mixed models. The mean age of patients was 67.6 ± 13, 50% were men, and 60% had unstable angina and the remainder had non-ST-elevated myocardial infarction. During follow-up, cardiac pain intensity scores remained in the mild range from 1.1 ± 2.2 to 2.4 ± 2.7. State anxiety ranged from 44.0 ± 7.2 to 46.2 ± 6.6. Cumulative analgesic dose was associated with a reduction in cardiac pain by 1.0 points (numeric rating scale, 0-10) (t108 = -2.5; SE, -0.25; confidence interval, -0.45 to -0.06; P = .013). Analgesic administration was not associated with state anxiety. Over the course of follow-up, ACS patients reported consistently high anxiety scores. Whereas cardiac pain declines in most patients in the early hours after admission, many patients experience a persistent anxious state up to 8 hours later, which suggest that development and testing of protocols for anxiety reduction may be needed. More urgently, the development and examination of a treatment intervention, early on in the ACS trajectory, are warranted that targets pain and anxiety for those for

  16. Association between preoperative magnetic resonance imaging, pain intensity and quantitative sensory testing in patients awaiting lumbar diskectomy.

    LENUS (Irish Health Repository)

    Hegarty, Dominic

    2011-02-01

    Magnetic resonance imaging (MRI) offers important information regarding the morphology, location and size of a herniated disc, which influences the decision to offer lumbar diskectomy (LD). This study aims to examine the association between clinical neurophysiologic indices including pain intensity and quantitative sensory testing (QST), and the degree of lumbar nerve root compromise depicted on magnetic resonance (MR) in patients awaiting LD.

  17. Bank of models for estimation of radioactive contamination consequences at the places where nuclear submarines are awaiting decommissioning

    International Nuclear Information System (INIS)

    Vorobiev, V.; Nosov, A.; Hitrikov, V.; Kiselev, V.; Korjov, M.; Krylov, A.; Kanevsky, M.; Petuhov, Y.

    1995-01-01

    The present paper presents a description of a computer bank of models for estimation of reactor accident consequences in harbors where Russian nuclear submarines are awaiting decommissioning. The computer bank is intended for an estimation of the consequences of a possible contamination of the surface water. It will also support the decision making in a tense situation. 2 figs., 1 tab

  18. Advantages of using 3D design tools in the nuclear power plants projects

    International Nuclear Information System (INIS)

    Roldan, P.; Melendro, J.; Gomez, A.; Hermana, I.

    2011-01-01

    It there is anything that distinguished Iberdrola Ingeneria y Construccion, as part of the Iberdrola Group, it is its firm commitment to innovation and continuous improvement. This is the philosophy that led the company to its interest in three-dimensional design tools back when they were in an early stage of development : very little international implementation, lack of integration with other applications, absence of previous experiences to understand the best possible configuration for each case, etc. Nevertheless, the company was able to see the tremendous advantage of having a construction program in the early months of a project- a detailed program that could predict, and therefore avoid, the problems that, if not anticipated, would arise in the construction phase when they result in higher costs, longer timeframes and a multitude of complications. This is precisely what 3D design tools offer prediction and this has been proven in the latest combined cycle projects executed with these tools. A project executed without errors not only decreases cost and time overruns, but also necessarily increases the quality of the end result. Efficiency and quality: these are both basic goals of Iberdrola Ingenieria y Construccion. The knowledge of and skill in the use of these tools have grown at the same time that their development has reached increasingly higher levels. As a result, Iberdrola Ingenieria y Conctruccion now has extensive experience in the use of 3D design tools and is prepared for the future challenges posed by these tools, the capabilities of which have attained such heights that it is possible to take on one of the most technically challenging projects that exists a nuclear power plant. And we are ready. (Author)

  19. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  20. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  1. Evaluation of nuclear facility decommissioning projects. Status report. Humboldt Bay Power Plant Unit 3, SAFSTOR decommissioning

    International Nuclear Information System (INIS)

    Baumann, B.L.; Haffner, D.R.; Miller, R.L.; Scotti, K.S.

    1986-06-01

    This document explains the purpose of the US Nuclear Regulatory Commission's (NRC) Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program and summarizes information concerning the decommissioning of the Humboldt Bay Power Plant (HBPP) Unit 3 facility. Preparations to put this facility into a custodial safe storage (SAFSTOR) mode are currently scheduled for completion by June 30, 1986. This report gives the status of activities as of June 1985. A final summary report will be issued after completion of this SAFSTOR decommissioning activity. Information included in this status report has been collected from the facility decommissioning plan, environmental report, and other sources made available by the licensee. This data has been placed in a computerized data base system which permits data manipulation and summarization. A description of the computer reports that can be generated by the decommissioning data system (DDS) for Humboldt Bay and samples of those reports are included in this document

  2. Influence of Pulmonary Hypertension on Patients With Idiopathic Pulmonary Fibrosis Awaiting Lung Transplantation.

    Science.gov (United States)

    Hayes, Don; Black, Sylvester M; Tobias, Joseph D; Kirkby, Stephen; Mansour, Heidi M; Whitson, Bryan A

    2016-01-01

    The influence of varying levels of pulmonary hypertension (PH) on survival in idiopathic pulmonary fibrosis is not well defined. The United Network for Organ Sharing database was queried from 2005 to 2013 to identify first-time lung transplant candidates listed for lung transplantation who were tracked from waitlist entry date until death or censoring to determine the influence of PH on patients with advanced lung disease. Using data for right heart catheterization measurements, mild PH was defined as mean pulmonary artery pressure of 25 mm Hg or more, and severe as 35 mm Hg or more. Of 6,657 idiopathic pulmonary fibrosis patients, 6,651 were used for univariate analysis, 6,126 for Kaplan-Meier survival function, 6,013 for multivariate Cox models, and 5,186 (mild PH) and 2,014 (severe PH) for propensity score matching, respectively. Univariate Cox proportional hazards analysis found significant differences in survival for mild PH (hazard ratio [HR] 1.689, 95% confidence interval [CI]: 1.434 to 1.988, p idiopathic pulmonary fibrosis awaiting lung transplantation, so referral should be considered early in the disease course. Copyright © 2016 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  3. Concordance and interchangeability of biometric measurements of ocular axial length in patients awaiting cataract surgery.

    Science.gov (United States)

    Martín-Serrano, María José; Roman-Ortiz, Carmen; Villa-Sáez, M Luz; Labrador-Castellanos, M Purificación; Blanco-Carrasco, Rosario; Lozano-Ballesteros, Felicidad; Pedraza-Martín, Carmen; José-Herrero, M Teresa San; López-Ropero, Ana M; Tenías Burillo, José María

    2014-01-01

    To estimate in patients awaiting cataract surgery the concordance and interchangeability of axial eye length measurements performed with the aid of various biometric methods (optical or ultrasonic) by different operators (nurses) at different times during the period prior to surgery. We selected 182 consecutive eyes from 91 patients.Ocular axial length was measured with the aid of 2 methods (IOLMaster® and Ocuscan®) by 9 randomly allocated technicians at 2 different times during the waiting period. The concordance between measurements was evaluated by means of the intraclass correlation coefficient (ICC); the interchangeability of the results was assessed with Bland Altman plots and Passing and Bablok regression. The measurements were consistent between biometric methods (ICC 0.975, 95% confidence interval [CI] 0.968 to 0.980) and measurement dates (ICC 0.996, 95% CI 0.995 to 0.997). Interobserver agreement was more heterogeneous (ICC range 0.844 to 0.998). No systematic errors were observed among the various biometric methods and measurement dates. Because measurement of axial length in phakic patients may be technician-dependent, the technician's experience should be noted in the protocols of ophthalmology services.

  4. Plant Responses to Increased UV-B Radiation: A Research Project

    Science.gov (United States)

    DAntoni, H. L.; Skiles, J. W.; Armstrong, R.; Coughlan, J.; Daleo, G.; Mayoral, A.; Lawless, James G. (Technical Monitor)

    1994-01-01

    Ozone decrease implies more ultraviolet-B (UV-B) radiation reaching the surface of the Earth. Increased UV-B radiation triggers responses by living organisms. Despite the large potential impacts on vegetation, little is known about UV-B effects on terrestrial ecosystems. Long-term ecological studies are needed to quantify the effects of increased UV radiation on terrestrial ecosystems, asses the risks, and produce reliable data for prediction. Screening pigments are part of one of the protective mechanism in plants. Higher concentrations of screening pigments in leaves may be interpreted as a response to increased UV radiation. If the screening effect is not sufficient, important molecules will be disturbed by incoming radiation. Thus, genetics, photosynthesis, growth, plant and leaf shape and size, and pollen grains may be affected. This will have an impact on ecosystem dynamics, structure and productivity. It is necessary to monitor selected terrestrial ecosystems to permit detection and interpretation of changes attributable to global climate change and depleted ozone shield. The objectives of this project are: (1) To identify and measure indicators of the effects of increased solar UV-B radiation on terrestrial plants; (2) to select indicators with the greatest responses to UV-B exposure; (3) to test, adapt or create ecosystem models that use the information gathered by this project for prediction and to enhance our understanding of the effects of increased UV-B radiation on terrestrial ecosystems. As a first step to achieve these objectives we propose a three-year study of forest and steppe vegetation on the North slope of the Brooks Range (within the Arctic circle, in Alaska), in the Saguaro National Monument (near Tucson, Arizona) and in the forests and steppes of Patagonia (Argentina). We selected (1) vegetation north of the Polar Circle because at 70N there is 8% risk of plant damage due to increased UV-B radiation; (2) the foothills of Catalina Mountains

  5. Siting Conflicts in Renewable Energy Projects in Sweden: Experiences From the Siting of a Biogas Plant

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Jamil

    2001-05-01

    This paper seeks to contribute to an increased understanding of what characterises conflicts regarding the siting of renewable energy facilities. The paper starts out with a brief introduction to different types of renewable energy and the conflicts they might generate as well as a discussion about the differences and similarities in comparison with conflicts over more controversial issues, such as nuclear plants, chemical factories and the construction of roads. The main part of the paper discusses the results from a case study on a failed attempt to site a biogas plant in southern Sweden. The results show that there was a lack of public participation in the early stages of planning, and that peoples negative perceptions of the possibilities to influence the decision-making and of the attitude of the developer, contributed to the development of a public opposition and a polarisation of the conflict. There is also a discussion about the reasons for a shift in the political support for the project and about the role of the legislation in shaping planning processes that either handle conflicts or make them worse. The paper concludes with the observation that the biogas case, in many ways, resembled traditional siting conflicts and that further research is needed to explore the nature of different renewable energy siting conflicts.

  6. Maryland Power Plant Siting Project: an application of the ORNL-Land Use Screening Procedure

    International Nuclear Information System (INIS)

    Dobson, J.E.

    1975-01-01

    Since 1974 the Resource Analysis Group in the Regional and Urban Studies Section of the Oak Ridge National Laboratory (ORNL) has been engaged in developing a procedure for regional and local siting analysis known as the ORNL Land Use Screening Procedure (LUSP). This document is the final report of the Maryland Power Plant Siting Project (MPPSP) in which the ORNL LUSP was used to identify candidate areas for power plant sites in northern Maryland. Numerous candidate areas are identified on the basis of four different siting objectives: the minimization of adverse ecologic impact, the minimization of adverse socioeconomic impact, the minimization of construction and operating costs, and a composite of all siting objectives. Siting criteria have been defined for each of these objectives through group processing techniques administered to four different groups of siting specialists. The siting priorities and opinions of each group have been expressed quantitatively and applied to a geographic information system containing 52 variables for each 91.8-acre cell in the northern eight counties of Maryland

  7. Phenix Power Plant Decommissioning Project. Treatment of the Primary Cold Trap

    International Nuclear Information System (INIS)

    Deluge, M.

    2008-01-01

    Phenix is a sodium-cooled fast neutron reactor located at the CEA's Rhone Valley Center where it was commissioned in 1974. It has an electric power rating of 250 MW and is operated jointly by the CEA and EDF. Its primary role today is to investigate the transmutation of long-lived radioactive waste into shorter-lived wasteform. Its final shutdown is scheduled for the beginning of 2009. In this context the Phenix Power Plant Decommissioning Project was initiated in 2003. It covers the definitive cessation of plant operation and the dismantling (D and D) operations together with the final shutdown preparatory phase. The final shutdown phase includes the operations authorized within the standard operating methodological framework. The dismantling phase also comprises treatment of sodium-bearing waste and dismantling of the nuclear facilities (reactor block, shielded cells, etc.). Treatment of the Phenix primary cold trap is scheduled to begin in 2016. The analysis program includes the following steps: - Accurately determine the contamination in the trap by carrying out gamma spectrometry measurement campaigns from 2007 to 2013 (the remaining difficulty will be to accurately determine the distribution of the contamination). - Validate the safety studies for the ELA facility. This work is currently in progress; ELA will be commissioned following inactive qualification testing. - Proceed with cutting tests on the knit mesh filter, which are scheduled to begin in 2008

  8. Maryland Power Plant Siting Project: an application of the ORNL-Land Use Screening Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, J.E.

    1975-01-01

    Since 1974 the Resource Analysis Group in the Regional and Urban Studies Section of the Oak Ridge National Laboratory (ORNL) has been engaged in developing a procedure for regional and local siting analysis known as the ORNL Land Use Screening Procedure (LUSP). This document is the final report of the Maryland Power Plant Siting Project (MPPSP) in which the ORNL LUSP was used to identify candidate areas for power plant sites in northern Maryland. Numerous candidate areas are identified on the basis of four different siting objectives: the minimization of adverse ecologic impact, the minimization of adverse socioeconomic impact, the minimization of construction and operating costs, and a composite of all siting objectives. Siting criteria have been defined for each of these objectives through group processing techniques administered to four different groups of siting specialists. The siting priorities and opinions of each group have been expressed quantitatively and applied to a geographic information system containing 52 variables for each 91.8-acre cell in the northern eight counties of Maryland.

  9. Performance analysis and pilot plant test results for the Komorany fluidized bed retrofit project

    Energy Technology Data Exchange (ETDEWEB)

    Snow, G.C. [POWER International, Inc., Coeur d`Alene, ID (United States)

    1995-12-01

    Detailed heat and mass balance calculations and emission performance projections are presented for an atmospheric fluidized bed boiler bottom retrofit at the 927 MWt (steam output) Komorany power station and district heating plant in the Czech Republic. Each of the ten existing boilers are traveling grate stoker units firing a local, low-rank brown coal. This fuel, considered to be representative of much of the coal deposits in Central Europe, is characterized by an average gross calorific value of 10.5 MJ/kg (4,530 Btu/lb), an average dry basis ash content of 47 %, and a maximum dry basis sulfur content of 1.8 % (3.4 % on a dry, ash free basis). The same fuel supply, together with limestone supplied from the region will be utilized in the retrofit fluidized bed boilers. The primary objectives of this retrofit program are, (1) reduce emissions to a level at or below the new Czech Clean Air Act, and (2) restore plant capacity to the original specification. As a result of the AFBC retrofit and plant upgrade, the particulate matter emissions will be reduced by over 98 percent, SO{sub 2} emissions will be reduced by 88 percent, and NO{sub x} emissions will be reduced by 38 percent compared to the present grate-fired configuration. The decrease in SO{sub 2} emissions resulting from the fluidized bed retrofit was initially predicted based on fuel sulfur content, including the distribution among organic, pyritic, and sulfate forms; the ash alkalinity; and the estimated limestone calcium utilization efficiency. The methodology and the results of this prediction were confirmed and extended by pilot scale combustion trials at a 1.0 MWt (fuel input), variable configuration test facility in France.

  10. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  11. Computer aided process planning at the Oak Ridge Y-12 plant: a pilot project

    International Nuclear Information System (INIS)

    Hewgley, R.E. Jr.; Prewett, H.P. Jr.

    1979-01-01

    In 1976, a formal needs analysis was conducted in one of the Fabrication Division Shops of all activities from the receipt of an order through final machining. The results indicated deficiencies in process planning activities involving special production work. A pilot program was organized to investigate the benefits of emerging CAM technology and application of GT concepts for machining operations at the Y-12 Plant. The objective of the CAPP Project was to provide computer-assisted process planning for special production machining in th shop. The CAPP team was charged with the specific goal of demonstrating computer-aided process planning within a four-year term. The CAPP charter included a plan with intermediate measurable milestones for achieving its mission. In three years, the CAPP project demonstrated benefits to process planning. A capability to retrieve historical records for similar parts, to review accurately the status of all staff assignments, and to generate detailed machining procedures definitely can impact the way in which a machine shop prepared for new orders. The real payoff is in the hardcopy output (N/C programs, studies, sequence plans, and procedures). 4 figures,

  12. Managing the development of plant subsystems for a large international project

    International Nuclear Information System (INIS)

    Gurd, D.

    2012-01-01

    ITER is an international collaborative project under development by nations representing over one half of the world's population. Major components will be supplied by 'Domestic Agencies' representing the various participating countries. While the supervisory control system, known as CODAC, will be developed 'in fund' by the International Organization at the project site in the south of France, the EPICS and PLC-based plant control subsystems are to be developed and tested locally, where the subsystems themselves are being built. This is similar to the model used for the development of the Spallation Neutron Source, which was a US national collaboration. However the much more complex constraints of an international collaboration preclude the use of many specifics of the SNS collaboration approach. Moreover, procedures for final system integration and commissioning at ITER are not yet well defined. This paper will outline the particular issues either inherent in an international collaboration or specific to ITER, and will suggest approaches to mitigate those problems with the goal of assuring a successful and timely integration and commissioning phase. (author)

  13. Outline of nuclear power plant project of fast breeder reactor (FBR) 'Monju'

    International Nuclear Information System (INIS)

    Suzuki, Fumio; Higashide, Noboru

    1982-01-01

    The first step of the construction of the fast breeder prototype reactor ''Monju'' in Japan was taken by the declaration of agreement of Fukui Prefecture governor in May, 1982, and the succeeding approval by the cabinet council. In this paper, the outline of the project is described. The paper first introduces the development status of FBRs in the world, and next, describes the progress of planning the ''Monju'' project. Initially, ''Monju'' was invited by Shiraki region of Tsuruga City, but the move of village was not agreed. Thus, the center of the site was moved to ''Haseda'' about 1 km north-east. In addition, there were some limitations, and the layout of the facility and the design of public work structures including harbour construction were done under many limiting conditions. However, the site is rather in good conditions, and the design rationalization was attempted as far as possible within a range which does not affect the safety of the nuclear power plant. The outline of the examination related to public works and the siting conditions are reported, dividing them into topographic features, geology, meteorology, sea conditions, and natural environment. As the public works plan, site preparation, roads, harbour installations and water intake and discharge facility are also described. (Wakatsuki, Y.)

  14. Preparation for commissioning of nuclear plant with reference to British Nuclear Fuels Plc fuel handling plant project

    International Nuclear Information System (INIS)

    Bamber, D.R.

    1987-01-01

    The new Fuel Handling Plant at British Nuclear Fuels Sellafield is part of a Pound 550M complex which provides facilities for the receipt, storage and mechanical preparation of both Magnox and A.G.R. fuel. The plant is very large and complex with considerable use of computer based process control systems, providing for physical and nuclear safety. The preparation of such plant for active commissioning necessitates a great many physical checks and technical evaluations in support of its safety case. This paper describes arrangements for plant commissioning checks, against the regulatory framework and explains the physical preparations necessary for their timely accomplishment. (author)

  15. Preparation for commissioning of nuclear plant with reference to British Nuclear Fuels Plc fuel handling plant project

    International Nuclear Information System (INIS)

    Bamber, D.

    1987-01-01

    The new Fuel Handing Plant at British Nuclear Fuels Sellafield is part of a Pound 550M complex which provides facilities for the receipt, storage and mechanical preparation of both magnox and A.G.R. fuel. The plant is very large and complex with considerable use of computer based process control systems, providing for physical and nuclear safety. The preparation of such plant for ''active'' commissioning necessitates a great many physical checks and technical evaluations in support of its safety case. This paper describes arrangements for plant commissioning checks, against the regulatory framework and explains the physical preparations necessary for their timely accomplishment. (author)

  16. 7 CFR 330.206 - Permits for plant pest movement associated with National Defense projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Permits for plant pest movement associated with... (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.206...

  17. Evaluation of the Safety Analysis Report for the Waste Isolation Pilot Plant Project

    International Nuclear Information System (INIS)

    Little, M.S.

    1985-05-01

    The Safety Analysis Report (SAR) for the Waste Isolation Pilot Plant (WIPP) Project was first published by the US Department of Energy (DOE), WIPP Project Office (WPO) in 1980. Since that time a total of eight amendments to this Report have been published. As part of its independent evaluation of the WIPP Project for the State of New Mexico, the Environmental Evaluation Group (EEG) maintains a continuing technical assessment of the information in this Report and its amendments. Beginning with the initial publication, and following the amendments, the EEG prepares detailed written comments and recommendations which are submitted to the WPO for consideration in future amendments. The WPO has made many substantial changes to the SAR in response to the EEG's comments. On frequent occasions, meetings between the two groups have been held in an effort to reach an accord on some of the more controversial issues. These meetings generally have been very constructive, but several important areas of conflict remain. In many instances, these areas represent changes which are to be considered by the WPO at some future date, rather than irreconcilable issues. The most important issues remaining to be resolved are included in the discussions of this report, and could be summarized as follows: (1) An amendment of the topical content to be more in accord with the DOE Order 5481.1A and AL 5481.1A. (2) Substantial revisions of the classification of components, structures and systems, and related quality assurance. (3) Revisions to the site geological and hydrologic data based on studies agreed to between DOE and the State

  18. Equipment sizing in a coal-fired municipal heating plant modernisation project with support for renewable energy and cogeneration technologies

    International Nuclear Information System (INIS)

    Kalina, Jacek

    2014-01-01

    Highlights: • Sizing of biomass fired cogeneration block is performed for existing heating plant. • Mathematical model for cogeneration block optimisation is presented. • Impact of financial support mechanisms on optimal solution is discussed. • Influence of short term variations of prices and support intensity is presented. • Different design parameters are suggested by economic and technical quality indices. - Abstract: The paper presents results of design parameters optimisation of a wood chips fired steam boiler based heat and power block in a sample project of coal fired municipal heating plant modernisation. The project assumes the conversion of the heating plant into a dual fuel heat and power plant. The problem that is presented is selection of cogeneration block structure and thermodynamic parameters taking into account financial support mechanisms for cogeneration and renewable energy technologies. There are examined energy conversion and financial performances of the project. The results show that without the financial support the project is not profitable although it generates savings of primary energy of fossil fuels. If an administrative incentives are applied the optimal technical solution is different than suggested by energy conversion efficiency or fossil fuel savings. Financial calculations were performed for Polish marked conditions in the years 2011 and 2014 showing the impact of relatively short term variations of prices and support intensity on optimal plant design parameters

  19. The biggest rooftop PV plant in Latin America. An example of a pioneering project for the whole region

    International Nuclear Information System (INIS)

    2016-01-01

    About a year ago, the largest rooftop PV installation in Latin America came online in Honduras. Inaugurated by the country’s president, Juan Orlando Hernández, in March 2015, the plant is situated on the roof of the region’s PepsiCo bottling plant, EMSULA (Embotelladora de Sula S.A.) in the town of San Pedro Sula. The project, which has become a reference in the region, has been developed over two phases, the first of which corresponds to a 259 kWp pilot project, commissioned in November 2013, to which the second phase was added last year. (Author)

  20. Fiscal 1981 Sunshine Project research report. Development of hydrothermal power plant. Development of binary cycle power plant. Conceptual plant design; 1981 nendo nessui riyo hatsuden plant no kaihatsu / binary cycle hatsuden plant no kaihatsu seika hokokusho . Plant gainen sekkei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Conceptual design was made on a 10MW class binary cycle power plant for a demonstration plant superior in reliability and profitability, under most realistic current geothermal field conditions. In the design, study was made on heat balance, main pipe system, equipment allocation, and electric system for a plant system configuration, and study was also made on preheater, evaporator, condenser, turbine and others for plant component equipment. Further study was made on optimization of mist cooling condenser, instrumentation, control, utility, and environmental measures. The following basic data were obtained through the conceptual design: plant inlet hot water temperature: 130 degrees C, plant outlet hot water temperature: 70 degrees C, hot water flow rate: 1,415t/h, working fluid: R-114, R-114 pressure in evaporator: 11.98kg/cm{sup 2} abs, R-114 evaporation temperature: 91.1 degrees C, R-114 condensation temperature: 31.0 degrees C, R- 114 flow rate: 2,265t/h, site area: 106.5m x 102.4m, building area: 48.7m x 16.8m, and building height: 13.0m. (NEDO)

  1. Development of a strategic plan for an international R and D project on innovative nuclear fuel cycles and power plants

    International Nuclear Information System (INIS)

    Kendall, J.; Choi, J.S.

    2002-01-01

    The long-term outlook for nuclear energy should be considered in a broader perspective of future energy needs, operational safety, proliferation and environmental impacts. An Advisory Group Meeting (AGM) on Development of a Strategic Plan for an International R and D Project on Innovative Nuclear Fuel Cycles and Power Plants was convened in Vienna in October 1999 to assess the criteria, the needs for international cooperation, and to formulate a strategic plan for project integration. (author)

  2. Data management for the Clinch River Breeder Reactor Plant Project by use of document status and hold systems

    International Nuclear Information System (INIS)

    Hunt, C.S.; Beck, A.E.; Akhtar, M.S.

    1982-01-01

    This paper describes the development, framework, and scope of the Document Status System and the Document Hold System for the Clinch River Breeder Reactor Plant Project. It shows how data are generated at five locations and transmitted to a central computer for processing and storage. The resulting computerized data bank provides reports needed to perform day-to-day management and engineering planning. Those reports also partially satisfy the requirements of the Project's Quality Assurance Program

  3. Preliminary project concerning the straw-fueled combined power-heat plant to be constructed at Glamsbjerg

    International Nuclear Information System (INIS)

    Gabriel, S.; Koch, T.

    1994-06-01

    Power and heat generation based on biomass gasification is of great importance due to its beneficial environmental effects and good economy. This report concerns a preliminary project on feasibility and problems of implementing a dual-purpose power plant, supplying both power and district heating to several schools, swimming pools and other public facilities at Glamsbjerg (Funen). The plant is to be based on thermal gasification (pyrolysis) of straw and use of the gas in a diesel engine. The diesels operate the power generator, and their waste heat should be utilized in the local district heating network. In order to establish a stable and flexible straw supply to the plant an evaluation of resources in the area has been carried out. Apart from straw-derived fuel the plant is planned to use natural gas for start and maintenance of the process. The prices of the combined plant and of the fuel processing are estimated in the report. (EG)

  4. An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells

    International Nuclear Information System (INIS)

    1990-10-01

    This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers ''will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of ''vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells

  5. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  6. CARA Project: development of the advanced ULE fuel element for heavy water nuclear power plants

    International Nuclear Information System (INIS)

    Brasnarof, Daniel O.; Marino, Armando C.; Florido, Pablo C.; Munoz, C.; Bianchi, Daniel R.; Giorgis, Miguel A.

    2006-01-01

    The CARA Project (Spanish acronym of Combustible Avanzado para Reactores Argentinos) is a national fuel element technology development, compatible with our nuclear power plants (Atucha I, Embalse and Atucha II). It takes into account the experience obtained in our nuclear organisations (CNEA-CONUAR-NASA). The goal of the CARA fuel element is the performance improvement for those reactors and the enhancing of their normal operative conditions. The CARA design allows the burnup extension by using 52 rods of the same diameter. Likewise it keeps good thermo-hydraulic behaviour. The fuel bundle can be directly used in nuclear power plants with horizontal channels. By using an additional system it can be installed in the PHWR with vertical channels. The expected profits, by the use of the CARA in our reactors, broadly guaranty the recovery of the fund for its development, due to a reduction of the NPP fuels and back end cost. We estimate a reduction in the generation cost between 20 or 25 % in relation to the present one if we use 0.85 or 0.90% SEU (Slightly Enriched Uranium). The use of the CARA fuel in our reactors will also reduce the amount of spent fuel to be treated. The shortening could be between 17 to 27 % in Atucha I in relation to the present ULE (0.85%), between 38 to 46% for Embalse, and 45 to 53% for Atucha II. The mechanical behaviour and hydraulic compatibility have been verified. Several CARA prototypes were fabricated with a new design of the end plate and with new processes for the welding for the rods. We present in this paper the current status of the CARA fuel element development. (author) [es

  7. Plant host finding by parasitic plants: a new perspective on plant to plant communication.

    Science.gov (United States)

    Mescher, Mark C; Runyon, Justin B; De Moraes, Consuelo M

    2006-11-01

    Plants release airborne chemicals that can convey ecologically relevant information to other organisms. These plant volatiles are known to mediate a large array of, often complex, interactions between plants and insects. It has been suggested that plant volatiles may have similar importance in mediating interactions among plant species, but there are few well-documented examples of plant-to-plant communication via volatiles, and the ecological significance of such interactions has been much debated. To date, nearly all studies of volatile-mediated interactions among plant species have focused on the reception of herbivore-induced volatiles by neighboring plants. We recently documented volatile effects in another system, demonstrating that the parasitic plant Cuscuta pentagona uses volatile cues to locate its hosts. This finding may broaden the discussion regarding plant-to-plant communication, and suggests that new classes of volatile-meditated interactions among plant species await discovery.

  8. Bioenergy guide. Projecting, operation and economic efficiency of biomass power plants; Leitfaden Bioenergie. Planung, Betrieb und Wirtschaftlichkeit von Bioenergieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Deimling, S. [Stuttgart Univ. (DE). Inst. fuer Energiewirtschaft und Rationelle Energieanwendung (IER); Kaltschmitt, M; Schneider, B. [and others

    2000-07-01

    This guide gives an survey over planning, operation and economics of biomass conversion plants. Main topics are: production and supply of biomass fuels, combustion properties, licensing, cost and financing. It shows planning and management of projects and the legal background for Germany and the European Union.

  9. Hanford Waste Simulants Created to Support the Research and Development on the River Protection Project - Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Eibling, R.E.

    2001-07-26

    The development of nonradioactive waste simulants to support the River Protection Project - Waste Treatment Plant bench and pilot-scale testing is crucial to the design of the facility. The report documents the simulants development to support the SRTC programs and the strategies used to produce the simulants.

  10. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Photographs and drawings were edited into a book in relation with a joint project for environment preservation technologies in high-efficiency extraction and treatment of mineral resources, and detail design for a pilot plant. The book classified the related devices into fabricated devices, purchased devices and electrical devices, and contains detailed drawings and photographs thereof. (NEDO)

  11. Outfall 51 air stripping feasibility study for the Reduction of Mercury in Plant Effluent (RMPE) Project. Revision 1

    International Nuclear Information System (INIS)

    1997-01-01

    Within the US Department of Energy's Oak Ridge Y-12 Plant there are a number of industrial wastewater discharge points or outfalls that empty into East Fork Poplar Creek (EFPC). EFPC originates within and runs continuously throughout the plant site and subsequently flows out the east end of the Y-12 Plant into the City of Oak Ridge. Mercury is present in outfall discharges due to contact of water with the soils surrounding past mercury-use buildings. As a result, the Reduction of Mercury in Plant Effluent (RMPE) Project was developed to achieve and maintain environmental compliance with regards to mercury, and, in particular with the National Pollutant Discharge Elimination System permit for the Y-12 Plant. To achieve a reduction in mercury loading to EFPC, a number of options have already been studied and implemented as part of the RMPE project. With the successful implementation of these options, Outfall 51 remains as a significant contributor to mercury load to EFPC. The primary purpose of this project is to determine the feasibility of removing mercury from contaminated spring water using air stripping. In order to accomplish this goal, a number of different areas were addressed. A pilot-scale unit was tested in the field using actual mercury-contaminated source water. Properties which impact the mercury removal via air stripping were reviewed to determine their effect. Also, enhanced testing was performed to improve removal efficiencies. Finally, the variable outfall flow was studied to size appropriate processing equipment for full-scale treatment

  12. TVA coal-gasification commercial demonstration plant project. Volume 5. Plant based on Koppers-Totzek gasifier. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    This volume presents a technical description of a coal gasification plant, based on Koppers-Totzek gasifiers, producing a medium Btu fuel gas product. Foster Wheeler carried out a conceptual design and cost estimate of a nominal 20,000 TPSD plant based on TVA design criteria and information supplied by Krupp-Koppers concerning the Koppers-Totzek coal gasification process. Technical description of the design is given in this volume.

  13. Emissions from decentralised CHP plants 2007 - Energinet.dk Environmental project no. 07/1882. Project report 5 - Emission factors and emission inventory for decentralised CHP production

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Malene; Nielsen, Ole-Kenneth; Thomsen, M.

    2010-06-15

    Updated emission factors for decentralised combined heat and power (CHP) plants with a capacity < 25MWe have been estimated based on project emission measurements as well as emission measurements performed in recent years that were collected. The emission factors valid for 2006/2007 have been estimated for the plant technologies: Municipal solid waste (MSW) incineration plants, plants combusting straw or wood, natural gas fuelled reciprocating engines, biogas fuelled engines, natural gas fuelled gas turbines, gas oil fuelled reciprocating engines, gas oil fuelled gas turbines, steam turbines combusting residual oil and reciprocating engines combusting biomass producer gas based on wood. The emission factors for MSW incineration plants are much lower than the emission factors that were estimated for year 2000. The considerable reduction in the emission factors is a result of lower emission limit values in Danish legislation since 2006 that has lead to installation of new and improved flue gas cleaning systems in most MSW incineration plants. For CHP plants combusting wood or straw no major technical improvements have been implemented. The emission factors for natural gas fuelled reciprocating engines have been reduced since year 2000 as a result of technical improvements that have been carried out due to lower emission limit values in Danish legislation. The NO{sub x} emission factor for natural gas fuelled gas turbines has decreased 62 % since year 2000. This is a result of installation of low-NO{sub x} burners in almost all gas turbines that has been necessary to meet new emission limits in Danish legislation. The emission measurements programme included screening of the emissions of HCB, PCB, PCDD/-F and PBDD/-F. Compared to the Danish national emission decentralized CHP plants are major emission sources for CH{sub 4}, NO{sub x}, SO{sub 2}, heavy metals and HCB. (author)

  14. Department of Energy Operation Quality Assurance Program for the Waste Isolation Pilot Plant (WIPP) Project (Carlsbad, New Mexico)

    International Nuclear Information System (INIS)

    1987-12-01

    The purpose of this plan is to describe the Quality Assurance (QA)reverse arrow Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Project Participants: the Scientific Advisor (Sandia National Laboratory) and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the Pre-Operational and Operational phases of the WIPP Project not addressed under the construction phase. This plan also requires the QA Programs for DOE and Project Participants to be structured so as to comply with this plan and ANSI-ASME NQA-1. The prime responsibility for Operational Quality Assurance rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Scientific Advisor and the Management and Operating Contractor. Overviews of selected operational and testing activities will be are conducted in accordance with prescribed requirements and that adequate documentation of these activities is maintained. 4 figs

  15. Deployment of a Prototype Plant GFP Imager at the Arthur Clarke Mars Greenhouse of the Haughton Mars Project

    Directory of Open Access Journals (Sweden)

    Robert J. Ferl

    2008-04-01

    Full Text Available The use of engineered plants as biosensors has made elegant strides in the past decades, providing keen insights into the health of plants in general and particularly in the nature and cellular location of stress responses. However, most of the analytical procedures involve laboratory examination of the biosensor plants. With the advent of the green fluorescence protein (GFP as a biosensor molecule, it became at least theoretically possible for analyses of gene expression to occur telemetrically, with the gene expression information of the plant delivered to the investigator over large distances simply as properly processed fluorescence images. Spaceflight and other extraterrestrial environments provide unique challenges to plant life, challenges that often require changes at the gene expression level to accommodate adaptation and survival. Having previously deployed transgenic plant biosensors to evaluate responses to orbital spaceflight, we wished to develop the plants and especially the imaging devices required to conduct such experiments robotically, without operator intervention, within extraterrestrial environments. This requires the development of an autonomous and remotely operated plant GFP imaging system and concomitant development of the communications infrastructure to manage dataflow from the imaging device. Here we report the results of deploying a prototype GFP imaging system within the Arthur Clarke Mars Greenhouse (ACMG an autonomously operated greenhouse located within the Haughton Mars Project in the Canadian High Arctic. Results both demonstrate the applicability of the fundamental GFP biosensor technology and highlight the difficulties in collecting and managing telemetric data from challenging deployment environments.

  16. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    International Nuclear Information System (INIS)

    Myers, N.K.

    1997-01-01

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  17. Finance structure and public enlightenment program of the first Turkish nuclear power plant project (a case study)

    International Nuclear Information System (INIS)

    Lutfi Sarici, E.

    2000-01-01

    This paper deals with four closely related subjects. These are: the positioning of nuclear energy in Turkey's energy planning by presenting supply and demand figures of electricity, giving emphasis to resource availability, pointing out the necessity of diversification of resources; the ongoing situation for realization of the Akkuyu Project with its updated milestones, alternative offers requested for the Akkuyu Nuclear Power Plant and member companies of the consortiums who already have submitted the three bids; the financing of big-scale energy investment projects in developing countries by giving special emphasis to the Akkuyu Nuclear Power Plant Project including the financing requirements in the Bid Specifications, OECD rules for financing, the requirements of financial agents, and financing means of domestic participation; public enlightenment during establishment of nuclear power in Turkey. (author)

  18. Using an Ongoing Study of Terrestrial Plant Response to Ultraviolet Radiation in Project ALERT

    Science.gov (United States)

    Condon, Estelle; Skiles, J. W.; Seitz, Jeffery C.; Dantoni, Hector L.

    1998-01-01

    The ALERT (Augmented Learning Environment for Renewable Teaching) Project is a cooperative California-based program with two main partners: California State University (CSU) geoscience and education departments and two NASA Centers, the Jet Propulsion Laboratory (JPL) in Pasadena and the Ames Research Center (ARC) in Mountain View. This paper presents an example of how a NASA research effort can be used in the undergraduate classroom. A study, now in the fourth year, subjects test plants to exposures of varying solar ultraviolet (UV) radiation (280 - 340 nm); a full solar UV exposure, a solar UV exposure less about 14% of ambient UV flux, and a UV-blocked regime. This experiment is simple in that only modest amounts of expense are required yet it is elegant since only one variable, UV-flux is involved. The experiment lends itself to teaching several of the Earth Sciences because it uses information from botany, taxonomy, and ecology. Aspects of physics are inherent in the study since portions of the electromagnetic spectrum are studied. Further, since only one of many variables are manipulated, UV flux, the study demonstrates how the scientific method is used in formulating and testing hypotheses. Based on the ALERT experience this summer, this study will be implemented at a CSU campus with the expectation that it will serve as a pedagogical tool and where it will involve students in actual research.

  19. Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates

    Energy Technology Data Exchange (ETDEWEB)

    Burford, D.P. [Southern Company Services, Inc., Birmingham, AL (United States)

    1997-12-31

    The Chiyoda Thoroughbred CT-121 flue gas desulfurization (FGD) process at Georgia Power`s Plant Yates completed a two year demonstration of its capabilities in late 1994 under both high- and low-particulate loading conditions. This $43 million demonstration was co-funded by Southern Company, the Electric Power Research Institute and the DOE under the auspices of the US Department of Energy`s Round II Innovative Clean Coal Technology (ICCT) program. The focus of the Yates Project was to demonstrate several cost-saving modifications to Chiyoda`s already efficient CT-121 process. These modifications included: the extensive use of fiberglass reinforced plastics (FRP) in the construction of the scrubber vessel and other associated vessels, the elimination of flue gas reheat through the use of an FRP wet chimney, and reliable operation without a spare absorber module. This paper focuses on the testing results from the last trimester of the second phase of testing (high-ash loading). Specifically, operation under elevated ash loading conditions, the effects of low- and high-sulfur coal, air toxics verification testing results and unexpected improvements in byproduct gypsum quality are discussed.

  20. Study of system safety evaluation on LTO of national project. NISA safety research project on system safety of nuclear power plants

    International Nuclear Information System (INIS)

    Takizawa, Masayuki; Sekimura, Naoto; Miyano, Hiroshi; Aoyama, Katsunobu

    2012-01-01

    Japanese safety regulatory body, that is, Nuclear and Industrial Safety Agency (NISA) started a 5-year national safety research project as 'the first stage' from 2006 FY to 2010 FY whose objective is 'Improve the technical information basis in order to utilize knowledge as well as information related to ageing management and maintenance of NPPs. Fukushima disaster happened in March 2011, and the priority of research needs for ageing management dramatically changed in Japan. The second-stage national project started in October 2011 with the concept of 'system safety' of NNPs where not only ageing management on degradation phenomena of important components but also safety management on total plant systems are paid attention to. The second-stage project is so called 'Japanese Ageing Management Program for System Safety (JAMPSS)'. (author)

  1. Pre-engineering assessment of Enersolve Demonstration Project. Dairy processing plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1985-07-15

    This study involved evaluation of a dairy processing plant to demonstrate energy conservation potential and developing a strategy to realize energy savings through retrofitting and revamping. The cheese and whey making plant of Agropur Cooperative Agro-Alimentaire located in Quebec was selected as a representative Canadian dairy processing plant. The pre-engineering assessment included a review of existing facility at the plant and plant operation, identification of plant equipment or process steps where substantial economic benefits would result from retrofitting and revamping, and estimation of budgetary cost for the subsequent engineering, procurement, construction management and monitoring of the retrofitted equipment. 3 figs., 2 tabs.

  2. Review of the Norwegian-Russian Cooperation on Safety Projects at Kola and Leningrad Nuclear Power Plants 2005 - 2009

    International Nuclear Information System (INIS)

    Mattsson, H.; Tishakov, P.

    2010-11-01

    In this report, Norwegian Radiation Protection Authority (NRPA) has reviewed the Norwegian funded projects on nuclear safety performed in the period 2005-2009 under the Norwegian Action Plan. NRPA has evaluated the progress of eight projects implemented by the Institute for Energy Technology (IFE) at Kola Nuclear Power Plant (KNPP) and Leningrad Nuclear Power Plant (LNPP). NRPA has visited the plants, inspected delivered equipment and discussed the projects implementation with relevant personnel at the plants. One of NRPA findings is that the equipment has been delivered to KNPP and LNPP, it is in regular use by competent personnel, and the equipment contributes to safety of both plants. Furthermore, the cooperation between three main project partners - IFE, LNPP and KNPP, seems to be very productive. NRPA's main conclusion is therefore that the projects have been implemented as described in IFE's project reports and that the goals are met. Furthermore, this report reviews safety levels at the KNPP and LNPP. Safety parameters at the plants indicate that the safety level has been significantly improved since early 1990s when the cooperation between Norway and Russia was initiated. Probabilistic safety assessment (PSA) values and number of INES (International Nuclear Event Scale) events, two internationally acknowledged safety parameters, indicate that the safety level has been much improved since the early 1990s when the cooperation between Norway and Russia started. Although it is clear that the Norwegian-funded projects have contributed positively to this development it is difficult to quantify the contribution. Moreover, the report also reviews the planned life-time of and the decommissioning plans for the reactors at KNPP and LNPP. Construction of new LNPP reactors has started and it is estimated that they will be operational in 2013- 2015. The license of the oldest reactor at LNPP expires in 2018 and if the new reactors are in operation by that time, it is

  3. The experience gained at various stages of the Atucha nuclear power plant project

    International Nuclear Information System (INIS)

    Cosentino, J.O.

    1977-01-01

    The paper describes the experience gained in Argentina at the successive stages of planning, feasibility study, decision-making, awarding of contracts, construction and operation of the first nuclear power plant in Latin America. In particular, the operating experience accumulated so far is summarized together with the requirements for preparing operating tables for the plant. The role of the Atucha plant is also described in connection with the second plant under construction and the third in the planning stage [es

  4. Wind Energy and Wildlife Pre- and Post-Construction Project at Pantex Plant

    Energy Technology Data Exchange (ETDEWEB)

    Matlack, Raymond S. [Texas A & M Univ., College Station, TX (United States)

    2018-01-03

    From 2009-2017, we conducted pre- and post-construction monitoring of wildlife at the Pantex Plant before and after construction of five wind turbines on the plant in 2014-2015. Pre-construction acoustic monitoring for bats was conducted at five sites on Pantex. Acoustic (here after Anabat) files were downloaded 30 times with Anabat files recorded from 6/21/2010 through 1/17/2014. The resulting data include over 3,000,000 files and we hope to analyze them in the future. We were never successful recording acoustic data after 2014 (post-construction). This is despite numerous attempts to trouble shoot our acoustic monitors. Wind damage to cables going from the body of the monitor to their microphones could not be repaired or replaced while towers were standing. Sampling of breeding birds was accomplished through point counts conducted at sites selected for turbine construction and others selected as control sites. Precipitation varied greatly over the course of the study, from a low of 17.81 cm (7.01 inches) during 2011 to a high of 87.96 cm (34.63 inches) during 2015. The pre-construction portion of the project was characterized by fairly extreme drought starting in 2011. Total precipitation for 2011 and 2012 was just 49.12 cm (19.34 inches), less than 50% of the average for a two-year period. The impact of this drought on nesting grassland birds manifest as low nesting species richness and abundance. In 2011 and 2012, 20 and 17 species were documented during point counts, respectively. Post-construction sampling followed the wet year of 2015 (87.96 cm, 34.63 inches). Species richness of nesting birds in 2016 and 2017 was considerably higher than during the drought, 40 and 37 species, respectively. We suspect changes in resource availability associated with relief from drought starting after 2015 was responsible for the recovery/increase in species detected during the breeding season; less importantly any changes from installation of turbines or changes in surface

  5. Financial feasibility analysis on small medium reactor nuclear power plant (SMR NPP) project in Indonesia under uncertainty

    International Nuclear Information System (INIS)

    Nuryanti; Suparman; Mochamad Nasrullah; Elok Satiti Amitayani; Wiku Lulus Widodo

    2015-01-01

    NPP SMR is one alternative to overcome the Outside Java Bali region's dependence on diesel power plant. One crucial issue in the NPP project (including SMR) would be financing, associated with the capital-intensive nature of the project. In addition, the SMR NPP project also be vulnerable in occurrence of some uncertainties. Therefore, this study aimed to analyze the financial feasibility of SMR NPP project by accommodating the possibility of the uncertainties. The methodology used is probabilistic analysis which was performed by Monte Carlo technique. This technique simulates the relationship between the uncertainty variables with financial feasibility indicators. The results showed that in probabilistic approach, SMR NPP project is considered feasible on the 'most probable value' of electricity selling price of 15 cents/kWh, indicated by positive average value of NPV (US$ 135,324,004) and the average value of both of IRRs are bigger than MARR (IRR project = 10.65 %, IRR Equity = 14.29 %, while MARR = 10 %). The probability of rejection of the SMR project was about 20 %. The three main variables that are most influential in the project were: selling price of electricity, investment cost and inflation rate. (author)

  6. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-07-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL`s Program is utilizing nearly all areas in PMI`s Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?`` and ``How are you approaching similar challenges?`` will be questions for a dialog with the audience.

  7. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    International Nuclear Information System (INIS)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-01-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL's Program is utilizing nearly all areas in PMI's Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?'' and ''How are you approaching similar challenges?'' will be questions for a dialog with the audience

  8. Impacts of oil sands process water on fen plants: Implications for plant selection in required reclamation projects

    International Nuclear Information System (INIS)

    Pouliot, Rémy; Rochefort, Line; Graf, Martha D.

    2012-01-01

    Fen plant growth in peat contaminated with groundwater discharges of oil sands process water (OSPW) was assessed in a greenhouse over two growing seasons. Three treatments (non-diluted OSPW, diluted OSPW and rainwater) were tested on five vascular plants and four mosses. All vascular plants tested can grow in salinity and naphthenic acids levels currently produced by oil sands activity in northwestern Canada. No stress sign was observed after both seasons. Because of plant characteristics, Carex species (C. atherodes and C. utriculata) and Triglochin maritima would be more useful for rapidly restoring vegetation and creating a new peat-accumulating system. Groundwater discharge of OSPW proved detrimental to mosses under dry conditions and ensuring adequate water levels would be crucial in fen creation following oil sands exploitation. Campylium stellatum would be the best choice to grow in contaminated areas and Bryum pseudotriquetrum might be interesting as it has spontaneously regenerated in all treatments. - Highlights: ► Fen plant growth was assessed under groundwater discharges of oil sands process water. ► Sedge and grass species were not stressed after two growing seasons in greenhouse. ► Carex species and Triglochin maritima would be helpful in created contaminated fens. ► In dry conditions, contaminated groundwater discharge was detrimental for mosses. ► Campylium stellatum would be the best choice in created fens with contaminated water. - Sedges and grasses tolerated the contact with oil sands process water and could probably grow well in contaminated created fens, but mosses were particularly affected under dry conditions.

  9. Expert report of ENSI on the request of EKKB AG for a general license - Project 'New nuclear power plant to replace the Beznau plant'

    International Nuclear Information System (INIS)

    2010-09-01

    taken into account through robust design of the buildings. From the very beginning EKKB will set up a team sufficient to operate the power plant safely. The power plant protection against sabotage, violent actions or embezzlement is based on well designed safeguards regarding building, technical, organisational and administrative measures. The volume of radioactive wastes which are produced during the operation of the power plant is evaluated; it is compatible with the project for the disposal of all radioactive wastes as accepted by the Swiss Federal Council. At the end of its operation period, the power plant can be entirely dismantled and the radioactive parts safely stored

  10. Evaluation of the integrity and duration of the Laguna Verde nuclear power plant life- Plant Life Management program (PLIM). TC MEX 04/53 Technical Cooperation Project

    International Nuclear Information System (INIS)

    Arganis J, C.R.; Diaz S, A.; Aguilar T, J.A.

    2006-01-01

    As part of the IAEA TC MEX 04/53 Project 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Handling Program of plant' whose objective is the one of beginning the actions to apply the methodology of Handling of plant life in the Unit 1 of the Laguna Verde Nucleo electric Central for to obtain the Renovation of License in 2020 the ININ, through the Department of Synthesis and Characterization of materials has carried out more of 20 analysis of susceptibility to the intergranular cracking for corrosion under effort in interns so much of the reactor of the unit 1 like of the unit 2 documenting the current state of components based on the type or types of materials that conform them, to it thermomechanical history, operational and of production, as well as of the particularities associated to its use and operation. For the application of the methodology of life handling of plant 5 structure systems or pilot components were selected, to carry out the programs of handling of the aging and handling of plant life: The encircling of the reactor core (Core Shroud), the reactor pressure vessel (Reactor Pressure Vessel), the primary container (Primary Containment), the recirculation system of feeding water (Reactor Feed Water) and cables. (Author)

  11. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    International Nuclear Information System (INIS)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG ampersand G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory's (INEL's) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG ampersand G Idaho is responsible concerning the INEL WETP. Even though EG ampersand G Idaho has no responsibility for the work that ANL-W is performing, EG ampersand G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and

  12. Influencing factors of public support for modern coal-fired power plant projects: An empirical study from China

    International Nuclear Information System (INIS)

    Liu, Feng; Lyu, Tao; Pan, Li; Wang, Fei

    2017-01-01

    With the development of clean coal technology, modern coal-fired power plants have achieved the similar emission standards as gas power plants. However, due to the impressions of high pollution and high emission in traditional coal-fired power plants, such projects are often opposed by local residents, which hinder the promotion of this technology. This manuscript aims to investigate public attitudes toward these projects and to analyze the influencing mechanisms of the factors of public support. The conceptual model was built with sense of place, trust and environmental attitude as the independent variables, benefit and cost perceptions as the mediating variables and public support as the dependent variable. The model was tested and modified by structural equation modelling. The results revealed that sense of place had a slight indirect impact (−0.043) on public support through benefit perception, whereas trust had a direct impact (0.332) on public support and indirect impacts (0.298) through benefit and cost perceptions. Environmental attitude had indirect impacts on public support through benefit perception (0.180) and cost perception (−0.115). In addition, policy suggestions on decision-making, project publicity and compensation strategy are proposed to enhance public support for similar projects. - Highlights: • This manuscript aims at eliminating the NIMBY effects on modern coal-fired power plant project. • A SEM model is proposed to explore how potential factors affect public support. • Trust is the dominant influencing factor to improve public support with both direct and indirect impacts. • Environmental attitude can also have positive effect on public support through rational compensation plans.

  13. The permissibility of power plants and other large-scale projects outside densely populated areas from the point of view of planning legislation

    International Nuclear Information System (INIS)

    Hoppe, W.

    1978-01-01

    For the licensing of power plants, nuclear power plants and other industrial large projects, the question of the building law admissibility gains more and more importance in the licensing procedure. According to paragraph 6 of the Fed. Immission Protection, it is not only necessary that immission protection duties of the operator of plants which are subject to licensing are fulfilled, but other public law regulations must be in correspondance with the construction and operation of the plant. In this connection, the planning law admissibility of the project must also be examined. This is also valid for nuclear power plants. In the practical application of licensing such plants are treated in different ways, as far as terms of building planning are concerned. Some licensing authorities regard them as priviledged outskirts projects, others demand a zoning plan of the community. The author pleads for such large projects to be licensed only on the basis of a zoning plan set up by the community. (orig.) [de

  14. Modern methods of project handling - lean management during the deconstruction of nuclear facilities as illustrated by the vitrification plant VEK

    International Nuclear Information System (INIS)

    Freund, Christina; Gentes, Sascha; Dux, Joachim; Reinelt, Joachim

    2011-01-01

    The authors describe the positive experiences from the project handling during the WAK deconstruction process including the implementation of the so called lean management that is supposed to optimize the timing and cost specific approaches. The practical application includes the planning, the licensing application and in case of licensing the realization of the project. Enhancement of transparency and information flow are reached by periodic last planner sessions. Time management and exact scheduling are central parts of the project handling. The contract partners, authorities and consultants are involved at an early state of the project. After shutdown of the vitrification plant VEK the planning for the deconstruction licensing application according to the atomic law have been started.

  15. Management and integration of engineering and construction activities: Lessons learned from the AP1000R nuclear power plant China project

    International Nuclear Information System (INIS)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-01-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  16. Specific safety aspects of the water-steam cycle important to nuclear power plant project

    International Nuclear Information System (INIS)

    Lobo, C.G.

    1986-01-01

    The water-steam cycle in a nuclear power plant is similar to that used in conventional power plants. Some systems and components are required for the safe nuclear power plant operation and therefore are designed according to the safety criteria, rules and regulations applied in nuclear installations. The aim of this report is to present the safety characteristics of the water-steam cycle of a nuclear power plant with pressurized water reactor, as applied for the design of the nuclear power plants Angra 2 and Angra 3. (Author) [pt

  17. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS, Volume 2 of 2: Appendices

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level. This report contains appendices A and B. Appendix A contains notices of preparation/notices of intent and EIR/EIS scoping comments. Appendix B contains GeothermEx, Inc., analysis of Geothermal Reservoir Effects and Induced Seismicity

  18. Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

  19. The decommissioning of WWER type nuclear power plants. Final report on an IAEA regional technical co-operation project

    International Nuclear Information System (INIS)

    2000-01-01

    Numerous WWER-440 nuclear power plants are in operation in central and eastern Europe and a small number have already been shut down. In addition to reactors already shut down, many other reactors will reach the end of their design lifetime in a few years and become candidates for decommissioning. It is unfortunate that little consideration was devoted to decommissioning of WWER-440 reactors at the plant design and construction stage, and little emphasis was placed on planning for decommissioning. It is within this context that the IAEA launched a regional technical co-operation project in 1994 with the aim of providing guidance on planning and management of decommissioning for WWERs. The project, which had a duration of four years (1995-1998), included the organization of workshops and scientific visits to countries having WWERs and other countries where active decommissioning projects were under way. Eventually, participants suggested the consolidation of expert guidance and collective opinions into a TECDOC, which was drafted by both designated participants from project recipient countries and invited experts. The TECDOC has the aim of serving as a stimulus for all concerned parties in central and eastern European countries to initiate concrete decommissioning planning, including assessment of existing and required resources for the eventual implementation of decommissioning plans. In addition, the regional technical co-operation project has managed to bring together in this TECDOC a number of good practices that could be useful in WWER-440 decommissioning

  20. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    International Nuclear Information System (INIS)

    Lewis, Michael G.

    2016-01-01

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  1. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Michael G. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-10-01

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  2. Atmospheric release advisory capability pilot project at two nuclear power plants and associated state offices of emergency preparedness. Final report

    International Nuclear Information System (INIS)

    Rosen, L.C.

    1983-01-01

    A project to demonstrate the feasibility of utilizing Atmospheric Release Advisory Capability (ARAC) limited service with commercial nuclear power plants and their associated state offices of emergency preparedness is discussed. Preliminary planning, installation and testing of the ARAC site facilities at Indian Point Nucler Power Station, New York State; at New York State Office of Emergency Preparedness, Albany, New York; at Rancho Seco Nuclear Generating Station, California; and at the State of California Office of Emergency Services, Sacramento, California, are summarized. ARAC participation in the Robert E. Ginna nuclear generating plant accident in New York on January 25, 1982, is discussed. The ARAC system is evaluated with emphasis on communications, the suite of models contained within the ARAC system, and the staff. The implications of this project in designing the next-generation ARAC system to service federal and state needs are assessed

  3. Rates of change in climatic niches in plant and animal populations are much slower than projected climate change

    Science.gov (United States)

    Jezkova, Tereza

    2016-01-01

    Climate change may soon threaten much of global biodiversity. A critical question is: can species undergo niche shifts of sufficient speed and magnitude to persist within their current geographic ranges? Here, we analyse niche shifts among populations within 56 plant and animal species using time-calibrated trees from phylogeographic studies. Across 266 phylogeographic groups analysed, rates of niche change were much slower than rates of projected climate change (mean difference > 200 000-fold for temperature variables). Furthermore, the absolute niche divergence among populations was typically lower than the magnitude of projected climate change over the next approximately 55 years for relevant variables, suggesting the amount of change needed to persist may often be too great, even if these niche shifts were instantaneous. Rates were broadly similar between plants and animals, but especially rapid in some arthropods, birds and mammals. Rates for temperature variables were lower at lower latitudes, further suggesting that tropical species may be especially vulnerable to climate change. PMID:27881748

  4. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  5. Bulgaria: Belene NPP. Project Control. Annex 3

    International Nuclear Information System (INIS)

    Nabatov, N.

    1999-01-01

    This annex deals with project control. The Belene project has been suspended for 7 years after approx. 50% of money had been spent. Equipment, structures and documentation have been well protected, but majority of qualified personnel have been lost. Resumption of work awaits government decision and provision of funds. (author)

  6. Outlining the project of the new RADAG hydro power plant; Projektueberblick ueber den Neubau des RADAG-Wehrkraftwerkes

    Energy Technology Data Exchange (ETDEWEB)

    Rost, Manfred; Schlageter, Guenter [Rheinkraftwerk Albbruck-Dogern AG, Laufenburg-Rhina (Germany)

    2010-07-01

    After expiration of the license in 2003 the Swiss Federal Council and the Freiburg District Government issued a new operating license for another 70 years. This new license first of all allows RADAG to continue operation of the existing power plant, situated at the end of a 3,8 km long channel. At the same time, however, it requires the company to commission a new plant besides the existing barrage by the end of 2012, which will increase the present day output from 528 GWh up to 650 GWh per year. RADAG immediately got down working on the project of what would be one of the largest run-of-river power stations in Germany. The new license provides and increase of the total turbine water flow from originally 1 100 m{sup 3}/s up to 1 400 m{sup 3}/s. The new power plant contains one large Kaplan turbine with an installed total wattage of 28 MW, thus increasing the overall wattage up to 108 MW. The total project costs of the new plant amount to about 68 Mio Euro (price level as per 2007), including 4 Mio Euro for environmental measures. (orig.)

  7. Effect of laughter on mood and heart rate variability in patients awaiting organ transplantation: a pilot study.

    Science.gov (United States)

    Dolgoff-Kaspar, Rima; Baldwin, Ann; Johnson, Scott; Edling, Nancy; Sethi, Gulshan K

    2012-01-01

    Research shows that laughter has myriad health benefits, yet the medical community has not implemented it formally as a treatment. Patients awaiting organ transplantation have significant physical disabilities and are at risk for psychological distress. Attenuated heart rate variability (HRV) is a risk factor for a negative long-term outcome in some patients. The study intended to evaluate the clinical utility of laughter yoga in improving psychological and physiological measures in outpatients awaiting organ transplantation. Positive results would indicate promising areas to pursue in a follow-up study. Six participants met for 10 sessions over 4 weeks. The research team measured each participant's heart rate, HRV, blood pressure (BP), and immediate mood before and after the laughter and control interventions. The team assessed participants' longer-term mood (anxiety and depression) at the study's initiation, after a no-treatment control week, and at the end of the study. The study occurred at the Department of Surgery and Medicine at the University of Arizona Health Sciences Center, Tucson. Participants were patients awaiting transplants (three heart and three lung), two women and four men (ages 51-69 y). Participants had received no major surgery in the 3 months prior to the intervention, did not have a hernia or uncontrolled hypertension, and did not fall into the New York Heart Association function class 4. The 20-minute laughter intervention involved breathing and stretching exercises, simulated laughter (ie, unconditional laughter that is not contingent on the environment), chanting, clapping, and a meditation. The 20-minute control intervention involved the study's personnel discussing health and study-related topics with the participants. The research team measured BP, heart rate, and HRV and administered the Profile of Mood States, Beck Anxiety Inventory, and Beck Depression Inventory-II to evaluate immediate and longer-term mood. The team had planned

  8. Effect of laughter yoga on mood and heart rate variability in patients awaiting organ transplantation: a pilot study.

    Science.gov (United States)

    Dolgoff-Kaspar, Rima; Baldwin, Ann; Johnson, M Scott; Edling, Nancy; Sethi, Gulshan K

    2012-01-01

    Research shows that laughter has myriad health benefits, yet the medical community has not implemented it formally as a treatment. Patients awaiting organ transplantation have significant physical disabilities and are at risk for psychological distress. Attenuated heart rate variability (HRV) is a risk factor for a negative long-term outcome in some patients. The study intended to evaluate the clinical utility of laughter yoga in improving psychological and physiological measures in outpatients awaiting organ transplantation. Positive results would indicate promising areas to pursue in a follow-up study. Six participants met for 10 sessions over 4 weeks. The research team measured each participant's heart rate, HRV, blood pressure (BP), and immediate mood before and after the laughter and control interventions. The team assessed participants' longer-term mood (anxiety and depression) at the study's initiation, after a no-treatment control week, and at the end of the study. The study occurred at the Department of Surgery and Medicine at the University of Arizona Health Sciences Center, Tucson. Participants were patients awaiting transplants (three heart and three lung), two women and four men (ages 51-69 y). Participants had received no major surgery in the 3 months prior to the intervention, did not have a hernia or uncontrolled hypertension, and did not fall into the New York Heart Association function class 4. The 20-minute laughter intervention involved breathing and stretching exercises, simulated laughter (ie, unconditional laughter that is not contingent on the environment), chanting, clapping, and a meditation. The 20-minute control intervention involved the study's personnel discussing health and study-related topics with the participants. The research team measured BP, heart rate, and HRV and administered the Profile of Mood States, Beck Anxiety Inventory, and Beck Depression Inventory-II to evaluate immediate and longer-term mood. The team had planned

  9. Projected Eastern Slovakia nuclear power plant and its effect on the area settlement structure

    International Nuclear Information System (INIS)

    Uvirova, E.

    1986-01-01

    The current situation of and expected changes in the settlement of the Kecerovce locality, where the Eastern Slovakia nuclear power plant will be sited, are discussed. The estimated requisition of agricultural soil and of forests is considered and the questions are outlined of the resettlement of the population in the power plant protective zone. (M.D.). 6 tabs., 4 refs

  10. The plant-parasitic nematode collections of RRIP: The realization of an ISTC project

    Science.gov (United States)

    Plant-parasitic nematodes are important pests of agricultural and wild plants throughout Russia and the world. The best strategy for management of nematode damage is an integrated approach to the problem: i.e., the use of agrotechnological approaches (crop rotation, soil amendments, etc.), reasonabl...

  11. An extension of the plant ontology project supporting wood anatomy and development research

    Science.gov (United States)

    Federic Lens; Laurel Cooper; Maria Alejandra Gandolfo; Andrew Groover; Pankaj Jaiswal; Barbara Lachenbruch; Rachel Spicer; Margaret E. Staton; Dennis W. Stevenson; Ramona L. Walls; Jill. Wegrzyn

    2012-01-01

    A wealth of information on plant anatomy and morphology is available in the current and historical literature, and molecular biologists are producing massive amounts of transcriptome and genome data that can be used to gain better insights into the development, evolution, ecology, and physiological function of plant anatomical attributes. Integrating anatomical and...

  12. Preliminary project concerning the straw-based combined power-heat plant at Glamsbjerg

    International Nuclear Information System (INIS)

    Gabriel, S.; Koch, T.

    1994-01-01

    The supplement to the main report on the planned dual-purpose power plant at Glamsbjerg contains documentation of the straw gasification and pyrolysis process, a detailed description of the power plant components, and the procedures of operation and maintenance of the combined systems. (EG)

  13. Basic survey project for Joint Implementation, etc. Feasibility study on the modernization of cement plant in Republic of Kazakhstan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a project was studied for the modernization of a cement plant in the Republic of Kazakhstan. In the Semipalatinsk cement plant, an old wet type kiln is being used which is much consuming in energy and low in productivity. By replacing this kiln with the NSP dry type kiln, expected were the enhancement of efficiency, energy conservation, and reduction in greenhouse effect gas emissions. Further, it was planned that four lines for raw material production and four lines for clinker combustion are tied together to make it one, and the ball mill is replaced with the low power-consuming type roller mill. By this project, the energy consumption will decrease by 96,000 t/y in coal and 2,095,500 kWh/y in electric power, which is a decrease of approximately 39% from the energy consumption before the project being worked out. Moreover, as to greenhouse effect gases, there are no changes in CO2 gas emissions from limestone, but CO2 gas emissions from coal decrease by 216.960 t/y, which is a decrease of 28.5% from that before the project being worked out. (NEDO)

  14. The CIDEM project for integrating availability, operating experience and maintenance in the design of future nuclear power plants

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    1998-01-01

    To minimize the kWh cost of future nuclear plants EDF has decided to implement the CIDEM project (French acronym for Design Integrating Availability, Operating Experience and Maintenance), an analytic and systematic process for studying new projects. The first CIDEM application is centered on the future French nuclear unit construction program, known as the REP 2000 Program but the approach could be applied to other Reactor type. The CIDEM studies at the beginning, were oriented to the issues strongly impacting the availability. They have concerned: planned outages, forced outages and preventive maintenance. The studies were carried out by a team grouping engineers from the 3 EDF's Divisions (Engineering-Generation-Research), and working together in a Concurrent Engineering-Mode. This team works in close collaboration with the vendors and the German Utilities involved in the REP 2000 EPR program. The implementation of the CIDEM process constitutes for EDF a new approach to the study of the new Nuclear Power Plant projects. The studies conducted in the availability field have already highlighted a number of critical points and have made it possible to establish a series of specifications for the REP 2000/EPR project. The integration in the design process of Preventive Maintenance and Logistic Support studies will allow a better control of the maintenance cost. The competitiveness of nuclear energy greatly depends on the success of such an approach. (author)

  15. The development of a wood fuel gasification plant utilising short rotation coppice and forestry residues: project ARBRE

    International Nuclear Information System (INIS)

    Pitcher, K.F.; Lundbergt, H.

    1997-01-01

    This paper will discuss the development of ARBRE Energy, a joint venture company that includes Yorkshire Environmental of the United Kingdom and Tenniska Processer AB of Sweden. The project will establish 2000 hectares of short rotation coppices, some of which will be organically fertilized with digested sewage sludges, to provide 80% of the fuel requirements of a biomass integrated gasification combined cycle (BIGCC) electricity generation plant. The remaining 20% of the fuel requirements will come from forestry waste, although in the first 5 years all the fuel will come from the forestry sources until the coppices are mature. The project will construct a gasification plant at Eggborough, North Yorkshire, England, which will provide gas to a gas turbine and steam turbine generation system, producing 10 MW and exporting 8 MW of electricity. It has been included in the 1993 tranche of the UK's Non Fossil Fuel Obligation (NFFO) and has gained financial support from the European Commission's THERMIE programme as a targeted BIGCC project. The project's technical and environmental effects and benefits will be examined in detail, together with the award of its planning permit and agreement on its operating license. (author)

  16. Plant Biomass Leaching for Nutrient Recovery in Closed Loop Systems Project

    Science.gov (United States)

    Zeitlin, Nancy P.; Wheeler, Raymond (Compiler); Lunn, Griffin

    2015-01-01

    Plants will be important for food and O2 production during long term human habitation in space. Recycling of nutrients (e.g., from waste materials) could reduce the resupply costs of fertilizers for growing these plants. Work at NASA's Kennedy Space Center has shown that ion exchange resins can extract fertilizer (plant essential nutrients) from human waste water, after which the residual brine could be treated with electrodialysis to recover more water and produce high value chemicals (e.g., acids and bases). In habitats with significant plant production, inedible biomass becomes a major source of solid waste. To "close the loop" we also need to recover useful nutrients and fertilizer from inedible biomass. We are investigating different approaches to retrieve nutrients from inedible plant biomass, including physical leaching with water, processing the biomass in bioreactors, changing the pH of leaching processing, and/or conducting multiple leaches of biomass residues.

  17. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    Directory of Open Access Journals (Sweden)

    Jovanović Filip P.

    2016-01-01

    Full Text Available This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reduction of the quantity of coke, whose production requires large amounts of energy, reduction of harmful exhaust emission and increase productivity of blast furnaces through the reduction of production costs. The project was complex and had high costs, so that it was necessary to predict risk events and plan responses to identified risks at an early stage of implementation, in the course of the project design, in order to minimise losses and implement the project in accordance with the defined time and cost limitations. [Projekat Ministarstva nauke Republike Srbije, br. 179081: Researching contemporary tendencies of strategic management using specialized management disciplines in function of competitiveness of Serbian economy

  18. Environmental management project of the Patache power plant project and associated transmission line; Gestion ambiental proyecto central termoelectrica Patache y linea de transmision asociada

    Energy Technology Data Exchange (ETDEWEB)

    Carreno Paredes, Cristian [Compania Electrica Tapaca (CELTA, S. A.), (Chile)

    1996-12-31

    This report makes a brief description of the services developed by INGENDESA of the projects executed in the area of engineering as well as in the area of environmental matters. In a second instance a relatively detailed presentation is made of the most important background of the Chilean project: {sup E}nvironmental Management of the Patache Power Plant and the Associated Transmission Line-Compania Electrica Tarapaca (CELTA, S.A.) Region I{sup .} The justification for the construction of the power plant and the environmental problems associated with the same are described [Espanol] En el presente informe se hace una breve presentacion de los servicios desarrollados por INGENDESA, de los proyectos elaborados tanto en el area de la ingenieria como en la tematica ambiental. En segunda instancia, se hace una presentacion relativamente detallada de los antecedentes mas importantes del proyecto chileno {sup G}estion Ambiental Central Patache y Linea de Transmision Asociada - Compania Electrica Tarapaca (CELTA, S.A.) I Region{sup .} Se describe la justificacion de la construccion de esta central termoelectrica y los problemas ambientales asociados a la misma

  19. Environmental management project of the Patache power plant project and associated transmission line; Gestion ambiental proyecto central termoelectrica Patache y linea de transmision asociada

    Energy Technology Data Exchange (ETDEWEB)

    Carreno Paredes, Cristian [Compania Electrica Tapaca (CELTA, S. A.), (Chile)

    1997-12-31

    This report makes a brief description of the services developed by INGENDESA of the projects executed in the area of engineering as well as in the area of environmental matters. In a second instance a relatively detailed presentation is made of the most important background of the Chilean project: {sup E}nvironmental Management of the Patache Power Plant and the Associated Transmission Line-Compania Electrica Tarapaca (CELTA, S.A.) Region I{sup .} The justification for the construction of the power plant and the environmental problems associated with the same are described [Espanol] En el presente informe se hace una breve presentacion de los servicios desarrollados por INGENDESA, de los proyectos elaborados tanto en el area de la ingenieria como en la tematica ambiental. En segunda instancia, se hace una presentacion relativamente detallada de los antecedentes mas importantes del proyecto chileno {sup G}estion Ambiental Central Patache y Linea de Transmision Asociada - Compania Electrica Tarapaca (CELTA, S.A.) I Region{sup .} Se describe la justificacion de la construccion de esta central termoelectrica y los problemas ambientales asociados a la misma

  20. Investment appraisal of heat and power plants within an emissions trading scheme. Final Report of the INVIS Project

    International Nuclear Information System (INIS)

    Laurikka, H.; Pirilae, P.

    2005-04-01

    The opportunity cost for carbon dioxide (CO 2 ) emissions has become a new factor influencing investments in heat and power production capacity globally, and in particular in countries with a greenhouse gas emissions trading system, such as the European Union Emissions Trading Scheme (EU ETS). There is a considerable power capacity investment need in the coming decades in Finland, in Europe and globally. As the economic lifetime of an investment in heat and power capacity typically ranges from 20-40 years, 'carbon finance' and the EU ETS therefore introduce a considerable and fundamental price risk to the investment problem. In Europe, the price risk is present in all investments and divestments of power production licences or capacity, be it a green-field plant, a retrofit of an existing plant or an acquisition. The objective of the INVIS research project was to extend the knowledge on strategic implications of emissions trading in investments into heat and power generation. This report gives an overview on the main findings of the project. The focus of INVIS project was on (1) quantitative investment appraisal and (2) methods rather than tools or parameter values. Particular attention in the INVIS project was paid to the incorporation of emissions trading in new methods of investment appraisal, which aim at taking into account the value of real options, rights to postpone or revise decisions. The EU ETS modifies the quantitative investment appraisal of heat and power plants directly through the emission allowance price and the number of free allowances and indirectly through impacts on output prices, input prices, taxation, and subsidies. From the risk perspective, the most problematic impact seems to be the regulatory uncertainty in the number of free allowances, which can turn out to be a barrier for investment in fossil-fuel-fired thermal power plants - even combined-cycle gas turbines. The emission allowance price is a stochastic variable, which implies it is

  1. CHALLENGES AND OPPORTUNITIES--INTEGRATED LIFE-CYCLE OPTIMIZATION INITIATIVES FOR THE HANFORD RIVER PROTECTION PROJECT--WASTE TREATMENT PLANT

    International Nuclear Information System (INIS)

    Auclair, K. D.

    2002-01-01

    This paper describes the ongoing integrated life-cycle optimization efforts to achieve both design flexibility and design stability for activities associated with the Waste Treatment Plant at Hanford. Design flexibility is required to support the Department of Energy Office of River Protection Balance of Mission objectives, and design stability to meet the Waste Treatment Plant construction and commissioning requirements in order to produce first glass in 2007. The Waste Treatment Plant is a large complex project that is driven by both technology and contractual requirements. It is also part of a larger overall mission, as a component of the River Protection Project, which is driven by programmatic requirements and regulatory, legal, and fiscal constraints. These issues are further complicated by the fact that both of the major contractors involved have a different contract type with DOE, and neither has a contract with the other. This combination of technical and programmatic drivers, constraints, and requirements will continue to provide challenges and opportunities for improvement and optimization. The Bechtel National, Inc. team is under contract to engineer, procure, construct, commission and test the Waste Treatment Plant on or ahead of schedule, at or under cost, and with a throughput capacity equal to or better than specified. The Department of Energy is tasked with the long term mission of waste retrieval, treatment, and disposal. While each mission is a compliment and inextricably linked to one another, they are also at opposite ends of the spectrum, in terms of expectations of one another. These mission requirements, that are seemingly in opposition to one another, pose the single largest challenge and opportunity for optimization: one of balance. While it is recognized that design maturation and optimization are the normal responsibility of any engineering firm responsible for any given project, the aspects of integrating requirements and the management

  2. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  3. W-007H B Plant Process Condensate Treatment Facility. Revision 3

    International Nuclear Information System (INIS)

    Rippy, G.L.

    1995-01-01

    B Plant Process Condensate (BCP) liquid effluent stream is the condensed vapors originating from the operation of the B Plant low-level liquid waste concentration system. In the past, the BCP stream was discharged into the soil column under a compliance plan which expired January 1, 1987. Currently, the BCP stream is inactive, awaiting restart of the E-23-3 Concentrator. B Plant Steam Condensate (BCS) liquid effluent stream is the spent steam condensate used to supply heat to the E-23-3 Concentrator. The tube bundles in the E-23-3 Concentrator discharge to the BCS. In the past, the BCS stream was discharged into the soil column. Currently, the BCS stream is inactive. This project shall provide liquid effluent systems (BCP/BCS/BCE) capable of operating for a minimum of 20 years, which does not include the anticipated decontamination and decommissioning (D and D) period

  4. W-007H B Plant Process Condensate Treatment Facility. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Rippy, G.L.

    1995-01-20

    B Plant Process Condensate (BCP) liquid effluent stream is the condensed vapors originating from the operation of the B Plant low-level liquid waste concentration system. In the past, the BCP stream was discharged into the soil column under a compliance plan which expired January 1, 1987. Currently, the BCP stream is inactive, awaiting restart of the E-23-3 Concentrator. B Plant Steam Condensate (BCS) liquid effluent stream is the spent steam condensate used to supply heat to the E-23-3 Concentrator. The tube bundles in the E-23-3 Concentrator discharge to the BCS. In the past, the BCS stream was discharged into the soil column. Currently, the BCS stream is inactive. This project shall provide liquid effluent systems (BCP/BCS/BCE) capable of operating for a minimum of 20 years, which does not include the anticipated decontamination and decommissioning (D and D) period.

  5. Inquiry Based Projects Using Student Ozone Measurements and the Status of Using Plants as Bio-Indicators

    Science.gov (United States)

    Ladd, I. H.; Fishman, J.; Pippin, M.; Sachs, S.; Skelly, J.; Chappelka, A.; Neufeld, H.; Burkey, K.

    2006-05-01

    Students around the world work cooperatively with their teachers and the scientific research community measuring local surface ozone levels using a hand-held optical scanner and ozone sensitive chemical strips. Through the GLOBE (Global Learning and Observations to Benefit the Environment) Program, students measuring local ozone levels are connected with the chemistry of the air they breathe and how human activity impacts air quality. Educational tools have been developed and correlated with the National Science and Mathematics Standards to facilitate integrating the study of surface ozone with core curriculum. Ozone air pollution has been identified as the major pollutant causing foliar injury to plants when they are exposed to concentrations of surface ozone. The inclusion of native and agricultural plants with measuring surface ozone provides an Earth system approach to understanding surface ozone. An implementation guide for investigating ozone induced foliar injury has been developed and field tested. The guide, Using Sensitive Plants as Bio-Indicators of Ozone Pollution, provides: the background information and protocol for implementing an "Ozone Garden" with native and agricultural plants; and, a unique opportunity to involve students in a project that will develop and increase their awareness of surface ozone air pollution and its impact on plants.

  6. Improving niche projections of plant species under climate change: Silene acaulis on the British Isles as a case study

    Science.gov (United States)

    Ferrarini, Alessandro; Alsafran, Mohammed H. S. A.; Dai, Junhu; Alatalo, Juha M.

    2018-04-01

    Empirical works to assist in choosing climatically relevant variables in the attempt to predict climate change impacts on plant species are limited. Further uncertainties arise in choice of an appropriate niche model. In this study we devised and tested a sharp methodological framework, based on stringent variable ranking and filtering and flexible model selection, to minimize uncertainty in both niche modelling and successive projection of plant species distributions. We used our approach to develop an accurate, parsimonious model of Silene acaulis (L.) presence/absence on the British Isles and to project its presence/absence under climate change. The approach suggests the importance of (a) defining a reduced set of climate variables, actually relevant to species presence/absence, from an extensive list of climate predictors, and (b) considering climate extremes instead of, or together with, climate averages in projections of plant species presence/absence under future climate scenarios. Our methodological approach reduced the number of relevant climate predictors by 95.23% (from 84 to only 4), while simultaneously achieving high cross-validated accuracy (97.84%) confirming enhanced model performance. Projections produced under different climate scenarios suggest that S. acaulis will likely face climate-driven fast decline in suitable areas on the British Isles, and that upward and northward shifts to occupy new climatically suitable areas are improbable in the future. Our results also imply that conservation measures for S. acaulis based upon assisted colonization are unlikely to succeed on the British Isles due to the absence of climatically suitable habitat, so different conservation actions (seed banks and/or botanical gardens) are needed.

  7. Marine ecological habitat: A case study on projected thermal power plant around Dharamtar creek, India

    Digital Repository Service at National Institute of Oceanography (India)

    Kulkarni, V.A.; Naidu, V.S.; Jagtap, T.G.

    Estuaries and tidal creeks, harboring mangroves particularly, face tremendous anthropogenic pressures. Expansion of mega cities and the thermal power plants are generally proposed in the vicinity of estuaries and creek, due to the feasibility...

  8. Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-01-01

    This document presents the Next Generation Nuclear Plant (NGNP) Systems, Subsystems, and Components, establishes a baseline for the current technology readiness status, and provides a path forward to achieve increasing levels of technical maturity.

  9. Integrated LED/Imaging Illumination Panels Demonstrated within a Small Plant Growth Chamber Project

    Data.gov (United States)

    National Aeronautics and Space Administration — LED light sources are ideal for plant growth systems. However, commercially available multi-color LED illumination panels are designed and manufactured to produce a...

  10. Expert report of ENSI on the request of KKN AG for a general license - Project 'New nuclear power plant Niederamt'

    International Nuclear Information System (INIS)

    2010-09-01

    volume of radioactive wastes which are produced during the operation of the power plant is evaluated; it is compatible with the project for the disposal of all radioactive wastes as accepted by the Swiss Federal Council. At the end of its operation period, the power plant can be entirely dismantled and the radioactive parts safely stored

  11. A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects

    Directory of Open Access Journals (Sweden)

    Dennis Travagini Cremonese

    Full Text Available Abstract In the early stage of front-end studies of a Mining Project, the global availability (i.e. number of hours a plant is available for production and production (number of hours a plant is actually operated with material time of the process plant are normally assumed based on the experience of the study team. Understanding and defining the availability hours at the early stages of the project are important for the future stages of the project, as drastic changes in work hours will impact the economics of the project at that stage. An innovative high-level dynamic modeling approach has been developed to assist in the rapid evaluation of assumptions made by the study team. This model incorporates systems or equipment that are commonly used in mining projects from mine to product stockyard discharge after the processing plant. It includes subsystems that will simulate all the component handling, and major process plant systems required for a mining project. The output data provided by this high-level dynamic simulation approach will enhance the confidence level of engineering carried out during the early stage of the project. This study discusses the capabilities of the approach, and a test case compared with standard techniques used in mining project front-end studies.

  12. Annx IV. Delayed nuclear power plant project management experience Cernavoda 2 NPP, Romania

    International Nuclear Information System (INIS)

    2008-01-01

    The Cernavoda Unit 2 NPP work was originally started in 1982 with work coming to a halt in 1989, and a preservation program implemented in 1991 while work continued on Unit 1. In 1995 attention turned to the completion of Unit 2 and status verification reports were commissioned. Work proceeded, as funds were available, up until 2002 when an interim contract was signed. Subsequently a Contract Completion Effective Date (CCED) was signed in March 2003 with completion duration of 48 months. A project schedule is a necessity for any project whether it is a new build or a restart to a delayed project. There are 5 major elements that are included in all CANDU project schedules, Engineering, Procurement, Construction, Commissioning and the conversion from Construction to Commissioning. The Engineering schedule of deliverables was not fully defined at CCED. Design changes defined prior to CCED were not fully defined and the scope of work associated with these only became known during the actual construction program. A significant number of new design changes were introduced after CCED, which compounded the impact to the construction program. All projects require their budgets to be built up within a defined structure. Delayed projects are no different from other projects in that respect. The standard Work Brakout Structure (WBS), which is applicable to most CANDU projects, is equally applicable for a delayed project. On Cernavoda Unit 2 we used a Budget Breakdown Structure, which was a combination of a traditional WBS and an Organization Structure. This structure was adopted in order to have consistency with the structure, which had been used prior to the delay on the project and also it was a requirement of the three party agreements with funding from different sources and in different currencies. All major construction projects normally carry a contingency allowance for undefined work and a risk allowance for the possibility of major changes. Delayed projects require

  13. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant (Mechanical fabrication)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The paper prepared plans of the mechanical equipment in the detailed design of a pilot plant in the joint research project on the environmental protection technology for highly efficient mineral resource extraction and treatment. (NEDO)

  14. Z-Plant material information tracking system (ZMITS) software development and integration project management plan

    International Nuclear Information System (INIS)

    IBSEN, T.G.

    1999-01-01

    This document plans for software and interface development governing the implementation of ZMITS and other supporting systems necessary to manage information for material stabilization needs of the Project Hanford Management Contract (PHMC)

  15. Projected role of nuclear power in Egypt and problems encountered in implementing the first nuclear power plant

    International Nuclear Information System (INIS)

    Effat, K.E.A.; Sirry, H.; El-Sharkawy, E.

    1977-01-01

    The increasing rise in fossil-fuel prices has favourably affected the economics of nuclear power generation bringing down the economically competitive size of nuclear units closer to small sizes compatible with grid capacities in developing countries. This encouraged Egypt to turn to nuclear power to fulfil its future power needs. In implementing its first nuclear power plant, Egypt is facing various problems. The capacity of the national electric power system and its inherent characteristics pose certain restrictions on the size and design of the nuclear plant required. The availability of sufficient local qualified management, engineering and technical personnel to participate in both precontractual and construction phases of the plant is quite a major problem. Lack of local developed industry to back up the construction phase implies the dependence to a large extent on imported equipment, materials and technology. The paper reviews the present and projected power demands in Egypt and the factors behind the decision to introduce a nuclear power generation programme. Various problems encountered and anticipated in introducing the first nuclear power plant are also discussed. (author)

  16. Longitudinal effects of disaster-related experiences on mental health among Fukushima nuclear plant workers: The Fukushima NEWS Project Study.

    Science.gov (United States)

    Ikeda, A; Tanigawa, T; Charvat, H; Wada, H; Shigemura, J; Kawachi, I

    2017-08-01

    The Fukushima Nuclear Energy Workers' Support (NEWS) Project Study previously showed that experiences related to the Fukushima nuclear disaster on 11 March 2011 had a great impact on psychological states, including post-traumatic stress response (PTSR) and general psychological distress (GPD), among the Fukushima nuclear plant workers. To determine the causal relationship between disaster-related experiences and levels of psychological states, we conducted a 3-year longitudinal study from 2011 to 2014. PTSR and GPD of the nuclear plant workers were assessed by annual questionnaires conducted from 2011 to 2014. The present study included a total of 1417 workers who provided an assessment at baseline (2011). A total of 4160 observations were used in the present analysis. The relationship between disaster-related experiences and psychological states over time was analysed using mixed-effects logistic regression models. A declining influence of disaster-related experiences on PTSR over time was found. However, the impact on PTSR remained significantly elevated even 3 years after the disaster in several categories of exposure including the experience of life-threatening danger, experiences of discrimination, the witnessing of plant explosion, the death of a colleague and home evacuation. The associations between GPD and disaster-related experiences showed similar effects. The effects of disaster-related experiences on psychological states among the nuclear plant workers reduced over time, but remained significantly high even 3 years after the event.

  17. Process engineering considerations in the design of the water treatment plant for the Rum Jungle rehabilitation project

    International Nuclear Information System (INIS)

    Ackland, M.C.

    1983-01-01

    The Rum Jungle rehabilitation programme includes the treatment of around 4 million cubic metres of water that has been polluted by previous treatment operations and acidic seepage containing heavy metal salts from slowly oxidising overburden dumps. The water to be treated is of low pH and contains high sulphate levels. Project rehabilitation criteria and the basic chemistry of metal salts in solution were considered in arriving at the final process design. In order to achieve a cost effective plant design, the process was translated into a flow sheet that used unit operations that are more typical of the extractive metallurgical than the traditional water treatment industry. Consideration of the unit operations and the operating aspects of the plant are discussed

  18. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  19. Selected natural and fallout radionuclides in plant foods around the Kudankulam Nuclear Power Project, India.

    Science.gov (United States)

    Ross, E Mahiban; Raj, Y Lenin; Wesley, S Godwin; Rajan, M P

    2013-01-01

    The activity concentrations of certain radionuclides were quantified in some plant foods cultivated around Kudankulam, where a mega-nuclear power plant is being established. The activity concentrations were found more in the 'pulses' group and were the lowest in 'other vegetable' category. The annual effective dose was computed based on the activity concentration of radionuclides and it was found to be higher due to the consumption of cereals and pulses. Other vegetables, cereals, pulses and nuts recorded high transfer factors for the radionuclide (228)Ra. Fruits, leafy vegetables, tubers and roots, and palm embryo registered high transfer factors for (226)Ra. Group-wise activity concentration, radiation dose to the public and soil-plant-to-transfer factor are discussed in detail. Copyright © 2012 Elsevier Ltd. All rights reserved.

  20. A data transmission system for the centrifuge enrichment plant safeguards project

    International Nuclear Information System (INIS)

    Hesse, E.W.

    1987-04-01

    A novel data transmission system was developed to enable the Australian Safeguards Office (ASO) in Sydney to monitor remotely the running of an experimental enrichment facility at the Lucas Heights Reserch Laboratories, using Telecom telephone lines. The system allowed ASO to monitor the enrichment, flows and activity in sensitive areas of the plant by means of a master computer at ASO and a slave computer at Lucas Heights. The slave computer sent requested data and scanned video pictures to determine intrusive changes to the plant. Detailed descriptions of the transmission system and method of operation are given, together with an outline of experience obtained during a three-month surveillance of the facility

  1. Municipal Waste-to-Energy plants in Poland – current projects

    Directory of Open Access Journals (Sweden)

    Cyranka Maciej

    2016-01-01

    Conclusions show why in the current situation development of Polish WtE infrastructure is right, i.e. operation of aforementioned plants that will ensure benefits associated with energy production, reduction of landfilling and informing public opinion regarding modern waste management models. Additionally, the article draws attention on the high responsibility that will be put on WtE plants operators and that experience gained during WtE implementation can be used to improve even further for future Polish Waste Management Systems.

  2. Soil-plant water status and wine quality: the case study of Aglianico wine (the ZOViSA project)

    Science.gov (United States)

    Bonfante, Antonello; Manna, Piero; Albrizio, Rossella; Basile, Angelo; Agrillo, Antonietta; De Mascellis, Roberto; Caputo, Pellegrina; Delle Cave, Aniello; Gambuti, Angelita; Giorio, Pasquale; Guida, Gianpiero; Minieri, Luciana; Moio, Luigi; Orefice, Nadia; Terribile, Fabio

    2014-05-01

    The terroir analysis, aiming to achieve a better use of environmental features with respect to plant requirement and wine production, needs to be strongly rooted on hydropedology. In fact, the relations between wine quality and soil moisture regime during the cropping season is well established. The ZOViSA Project (Viticultural zoning at farm scale) tests a new physically oriented approach to terroir analysis based on the relations between the soil-plant water status and wine quality. The project is conducted in southern Italy in the farm Quintodecimo of Mirabella Eclano (AV) located in the Campania region, devoted to quality Aglianico red wine production (DOC). The soil spatial distribution of study area (about 3 ha) was recognized by classical soil survey and geophysics scan by EM38DD; then the soil-plant water status was monitored for three years in two experimental plots from two different soils (Cambisol and Calcisol). Daily climate variables (temperature, solar radiation, rainfall, wind), daily soil water variables (through TDR probes and tensiometers), crop development (biometric and physiological parameters), and grape must and wine quality were monitored. The agro-hydrological model SWAP was calibrated and applied in the two experimental plots to estimate soil-plant water status in different crop phenological stages. The effects of crop water status on crop response and wine quality was evaluated in two different pedo-systems, comparing the crop water stress index with both: crop physiological measurements (leaf gas exchange, leaf water potential, chlorophyll content, LAI measurement), grape bunches measurements (berry weight, sugar content, titratable acidity, etc.) and wine quality (aromatic response). Finally a "spatial application" of the model was carried out and different terroirs defined.

  3. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GIS) mbH, Weinheim (Germany)

    2014-07-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  4. Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08

  5. Current situation of the project finishing of the building of 3 and 4 block of the nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In the contribution there is the basic information mentioned about history of building and the current situation at the finishing of the building of 3 and 4 block of the Nuclear Power Plant Mochovce with the use of project digitization. Further on the contribution shows what kinds of supporting material has been elaborated, what kind of decisions have been issued to the finishing of the building, way of financing and also the assumption of investment return under the defined conditions. An orientation time schedule of the finishing of the building and the crucial steps for its security are presented in the conclusion

  6. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  7. MOCAT project: support tool to the management of the emergencies in the nuclear power plant of Santa Maria of Garona

    International Nuclear Information System (INIS)

    Calleja, J. L.

    2010-01-01

    Santa Maria de Garona NPP, as part of its continuous improvement philosophy, has decided to undertake the modernization of its Technical Support Center (CAT with the aim of improving the emergency management, provided in the Internal Emergency Plan. To this end, Tecnatom, applying the know-how acquired and within its line of technological innovation, has designed the Technical Support Center modernization project, MOCAT, in collaboration with Garona NPP. This project is basically the application of new information and communications technologies to the management of the information available on the CAT, and the computerization of the procedures for the responsible from the different areas of the CAT, which it is going to contribute significantly to the improvement of the security, allowing a better understanding of the state of the plant in emergency as well as a faster and smoother decision making, and an improved training and education of those responsible for the CAT in emergency management. (Author) 8 refs.

  8. Savannah River Plant - Project 8980 engineering and design history. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    1957-01-01

    This volume provides an engineering and design history of the 100 area of the Savannah River Plant. This site consisted of five separate production reactor sites, 100-R, P, L, K, and C. The document summarizes work on design of the reactors, support facilities, buildings, siting, etc. for these areas.

  9. Borehole Summary Report for Core Hole C4998 – Waste Treatment Plant Seismic Boreholes Project

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. BRENT; Garcia, Benjamin J.

    2006-12-15

    Seismic borehole C4998 was cored through the upper portion of the Columbia River Basalt Group and Ellensburg Formation to provide detailed lithologic information and intact rock samples that represent the geology at the Waste Treatment Plant. This report describes the drilling of borehole C4998 and documents the geologic data collected during the drilling of the cored portion of the borehole.

  10. Project W-340 long reach arm retrieval system balance of plant instrumentation workshop engineering study

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1994-01-01

    This engineering study documents the results of a workshop held to resolve Issue No. 26 generated at a Arm Based Retrieval Functional Analysis Value Engineering Session. The issue deals with the scope of the Balance of Plant Instrumentation needs for the LRARS

  11. Defense waste solidification studies. Volume 2. Drawing supplement. Savannah River Plant, Project S-1780

    International Nuclear Information System (INIS)

    1977-01-01

    Volume 2 contains the drawings prepared and used in scoping and estimating the Glass-Form Waste Solidification facilities and the alternative studies cited in the report, the Off-Site Shipping Case, the Decontaminated Salt Storage Case, and a revised Reference Plant (Concrete-Form Waste) Case

  12. Real Time Demonstration Project XRF Performance Evaluation Report for Paducah Gaseous Diffusion Plant AOC 492

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Robert L [Argonne National Laboratory

    2008-04-03

    This activity was undertaken to demonstrate the applicability of market-available XRF instruments to quantify metal concentrations relative to background and risk-based action and no action levels in Paducah Gaseous Diffusion Plant (PGDP) soils. As such, the analysis below demonstrates the capabilities of the instruments relative to soil characterization applications at the PGDP.

  13. Utility-Scale Solar Photovoltaic Power Plants : A Project Developer’s Guide

    OpenAIRE

    International Finance Corporation

    2015-01-01

    With an installed capacity greater than 137 gigawatts (GWs) worldwide and annual additions of about 40 GWs in recent years, solar photovoltaic (PV) technology has become an increasingly important energy supply option. A substantial decline in the cost of solar PV power plants (80 percent reduction since 2008) has improved solar PV’s competitiveness, reducing the needs for subsidies and ena...

  14. GRIN-Global: An International Project to Develop a Global Plant Genebank and Information Management System

    Science.gov (United States)

    Many of the world's national genebanks, responsible for the safeguarding and availability of their country's Plant Genetic Resource (PGR) collections, have lacked access to high quality IT needed to document and manage their collections electronically. The Germplasm Resource Information System (GRI...

  15. Development of Export Control Comprehensive Management Model for Nuclear Power Plants and Others Projects

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chansuh; Seo, Hana; Choi, Sundo [Korea Institute of Nuclear Nonproliferation And Control, Daejeon (Korea, Republic of)

    2014-05-15

    It is required that there are lots of managements of care and concern if the project contains strategic items such as NPPs. The Korean nuclear industry and its related companies, such as the Korea Hydro and Nuclear Power (KHNP), are promoting greater exports of NPPs. It is likely that Korea will export more this technology to newcomer states in the future. As a result, the ROK has been improving its export control management system for NPPs. In keeping with this national effort, Korea Institute of Nuclear Nonproliferation And Control (KINAC) developed comprehensive export control management model for NPPs and other projects, in preparation for this projected growth in the industry. This model also applies to the nuclear export case of the UAE, aims to manage the project from bidding to the end of the contract. The recent Export Licensing of Nuclear Facility Technology was reflected in the Notice on Export and Import of Strategic Items in January 2014. Through this license, the large-scale project legislation framework was established. It can also minimize nonproliferation concerns of the international community through strict management. It is expected that the Korea will be able to enhance transparency and secure the nuclear use, while meeting nonproliferation purpose.

  16. Development of Export Control Comprehensive Management Model for Nuclear Power Plants and Others Projects

    International Nuclear Information System (INIS)

    Lee, Chansuh; Seo, Hana; Choi, Sundo

    2014-01-01

    It is required that there are lots of managements of care and concern if the project contains strategic items such as NPPs. The Korean nuclear industry and its related companies, such as the Korea Hydro and Nuclear Power (KHNP), are promoting greater exports of NPPs. It is likely that Korea will export more this technology to newcomer states in the future. As a result, the ROK has been improving its export control management system for NPPs. In keeping with this national effort, Korea Institute of Nuclear Nonproliferation And Control (KINAC) developed comprehensive export control management model for NPPs and other projects, in preparation for this projected growth in the industry. This model also applies to the nuclear export case of the UAE, aims to manage the project from bidding to the end of the contract. The recent Export Licensing of Nuclear Facility Technology was reflected in the Notice on Export and Import of Strategic Items in January 2014. Through this license, the large-scale project legislation framework was established. It can also minimize nonproliferation concerns of the international community through strict management. It is expected that the Korea will be able to enhance transparency and secure the nuclear use, while meeting nonproliferation purpose

  17. Structuring and financing new nuclear power plant projects in Europe: selected remarks

    International Nuclear Information System (INIS)

    Belchev, A.

    2004-01-01

    Project financing in the field of nuclear energy is discussed taking into account the changes and new challenges in Europe. Bringing a project to maturity under 'revised' assumptions is likely to be a complex task for all parties involved, but there is a real potential for an enhanced role for stake holders from the private sector. There is a more realistic understanding about how the public and the private sectors can work together. Successfully combining public and private, national and foreign stake holders is likely to be a critical factor of success. The alignment of interest over the long term best serves a projects business case. In that context, a Governments policies are increasingly under the spotlight

  18. Basic investigation on promotion of joint implementation in fiscal 2000. Efficiency improvement project for gas turbine power plant in Iran; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Iran gas turbine hatsuden plant no koritsu kaizen project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Investigations and discussions have been given on measures to improve energy conservation and efficiency at a power plant of Kish Water and Power Company (KWPC) in Iran. The site has high ambient temperature throughout a year, making the gas turbine power plant capable of generating power only at about 70% of the rated output, with the power generation efficiency decreasing. The project has analyzed the current situation at the plant, and evaluated different means that appear effective in improving the efficiency, including the gas turbine absorbed air cooling system, the steam injection system, and the combined cycle. As a result of the discussions, it was revealed that energy saving effect can be obtained at 145 TJ with the gas turbine absorbed air cooling system, 224 TJ with the steam injection system, and 1017 TJ with the combined cycle. The annual reduction of greenhouse gas emission due to the above energy conservation would be about 11 thousand tons, 16.5 thousand tons, and 75 thousand tons, respectively. However, the investment payback period would be about 2.45 years, 8.31 years, and 14.21 years, respectively. Therefore, the profitability does not appear very attractive because of low fuel unit cost. (NEDO)

  19. Measurement Properties of Performance-Specific Pain Ratings of Patients Awaiting Total Joint Arthroplasty as a Consequence of Osteoarthritis

    Science.gov (United States)

    Stratford, Paul W.; Kennedy, Deborah M.; Woodhouse, Linda J.; Spadoni, Gregory

    2008-01-01

    Purpose: To estimate the test–retest reliability of the Western Ontario and McMaster Universities Osteoarthritis Index (WOMAC) pain sub-scale and performance-specific assessments of pain, as well as the association between these measures for patients awaiting primary total hip or knee arthroplasty as a consequence of osteoarthritis. Methods: A total of 164 patients awaiting unilateral primary hip or knee arthroplasty completed four performance measures (self-paced walk, timed up and go, stair test, six-minute walk) and the WOMAC. Scores for 22 of these patients provided test–retest reliability data. Estimates of test–retest reliability (Type 2,1 intraclass correlation coefficient [ICC] and standard error of measurement [SEM]) and the association between measures were examined. Results: ICC values for individual performance-specific pain ratings were between 0.70 and 0.86; SEM values were between 0.97 and 1.33 pain points. ICC estimates for the four-item performance pain ratings and the WOMAC pain sub-scale were 0.82 and 0.57 respectively. The correlation between the sum of the pain scores for the four performance measures and the WOMAC pain sub-scale was 0.62. Conclusion: Reliability estimates for the performance-specific assessments of pain using the numeric pain rating scale were consistent with values reported for patients with a spectrum of musculoskeletal conditions. The reliability estimate for the WOMAC pain sub-scale was lower than typically reported in the literature. The level of association between the WOMAC pain sub-scale and the various performance-specific pain scales suggests that the scores can be used interchangeably when applied to groups but not for individual patients. PMID:20145758

  20. China's upstream oil and gas industry opens in steps to outsiders, awaits big discovery

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    Since 1979, when the government began opening upstream projects to foreign capital, international companies have invested more than $4.2 billion in Chinese exploration and production, most of it offshore. But the payoff, both to China and to its new international investors, has been limited. The trend, nevertheless, is toward more and better opportunities for companies from outside China. The government wants the country to return to petroleum self-sufficiency. It recognizes that economic growth of 8--10%/year will keep demand rising steadily and make self-sufficiency increasingly difficult to reachieve and maintain. What's most important, it recognized long ago that the capital and technology essential to the job can come only from abroad. The paper discusses the shifting emphasis of the government's dealings with outsiders; the second round of bidding for onshore tracts; operations of the China National Petroleum Corp. which handles onshore operations; offshore operations; and China's progress since 1979

  1. Programme and activities on nuclear desalination in Morocco. Pre-project study on demonstration plant for seawater desalination using nuclear heating reactor in Morocco

    International Nuclear Information System (INIS)

    Righi, M.

    1998-01-01

    The first part of this paper gives the general information on the pre-project study of a demonstration plant for seawater desalination using a heating reactor being assessed jointly by Morocco and China. The progress of the pre-project study is elaborated in the second part. (author)

  2. Environmental Regulation of Plant Gene Expression: An Rt-qPCR Laboratory Project for an Upper-Level Undergraduate Biochemistry or Molecular Biology Course

    Science.gov (United States)

    Eickelberg, Garrett J.; Fisher, Alison J.

    2013-01-01

    We present a novel laboratory project employing "real-time" RT-qPCR to measure the effect of environment on the expression of the "FLOWERING LOCUS C" gene, a key regulator of floral timing in "Arabidopsis thaliana" plants. The project requires four 3-hr laboratory sessions and is aimed at upper-level undergraduate…

  3. Exploratory Project: Rigid nanostructured organic polymer monolith for in situ collection and analysis of plant metabolites from soil matrices

    Energy Technology Data Exchange (ETDEWEB)

    Tharayil, Nishanth [Clemson Univ., SC (United States)

    2016-06-29

    -template imprinting approach for the selective capture of less abundant plant metabolites from a crowded soil/litter leachate. Our results suggests that i) the root exudate pattern of plants is highly dependent on the nutrient status of the plant, with greater specificity of root exudation occurring in growing medium with low available form of nutrients, ii) the chemical composition of root exudation is a function of the distance of sampling from the source-roots, with the composition of root exudation being more enriched in polar metabolites farther from the source-roots, iii) Further we demonstrated that the compounds present in real root exudates diffuse farther from the source roots than those in artificial root exudates that are traditionally used. Thus, our project highlights how the soil matrix is instrumental in modifying the chemical composition of root exudates, and highlights that, apart from the plant physiology, the specificity and function of root exudates is also modified by environmental factors.

  4. The LifeWebs project: A call for data describing plant-herbivore interaction networks

    Czech Academy of Sciences Publication Activity Database

    Fayle, Tom Maurice; Sam, Kateřina; Humlová, A.; Cagnolo, L.; Novotný, Vojtěch

    2016-01-01

    Roč. 8, č. 4 (2016), č. článku e31122. ISSN 1948-6596 R&D Projects: GA ČR GB14-36098G Institutional support: RVO:60077344 Keywords : herbivory * food web * trophic interaction Subject RIV: EH - Ecology, Behaviour https://escholarship.org/uc/item/4mv2t52s

  5. 75 FR 60405 - Lincoln National Forest, New Mexico, Integrated Non-Native Invasive Plant Project

    Science.gov (United States)

    2010-09-30

    ... Environmental Impact Statement. SUMMARY: The Lincoln National Forest (LNF) proposes to implement an integrated... by November 29, 2010. The draft environmental impact statement is expected January 2011 and the final environmental impact statement is expected April 2011. ADDRESSES: Send written comments to NNIP Project, Lincoln...

  6. An extension of the Plant Ontology project supporting wood anatomy and development research

    NARCIS (Netherlands)

    Lens, F.; Cooper, L.; Gandolfo, M.A.; Groover, A.; Jaiswal, P.; Lachenbruch, B.; Spicer, R.; Staton, M.E.; Stevenson, D.W.; Walls, R.L.; Wegrzyn, J.

    2012-01-01

    The Wood Ontology project will provide a structured vocabulary and database resource that will be valuable for all scientists, including the IAWA community. To maximizethe utility of the resource and analyses it empowers, it is important for researchers to adopt the use of the ontology terms in the

  7. An Extreme Meteorological Events Analysis For Nuclear Power Plant (NPP) Siting Project at Bangka Island, Indonesia

    Science.gov (United States)

    Septiadi, Deni; S, Yarianto Sugeng B.; Sriyana; Anzhar, Kurnia; Suntoko, Hadi

    2018-03-01

    The potential sources of meteorological phenomena in Nuclear Power Plant (NPP) area of interest are identified and the extreme values of the possible resulting hazards associated which such phenomena are evaluated to derive the appropriate design bases for the NPP. The appropriate design bases shall be determined according to the Nuclear Energy Regulatory Agency (Bapeten) applicable regulations, which presently do not indicate quantitative criteria for purposes of determining the design bases for meteorological hazards. These meteorological investigations are also carried out to evaluate the regional and site specific meteorological parameters which affect the transport and dispersion of radioactive effluents on the environment of the region around the NPP site. The meteorological hazards are to be monitored and assessed periodically over the lifetime of the plant to ensure that consistency with the design assumptions is maintained throughout the full lifetime of the facility.

  8. Experience in the use of teleoperated robotic equipment in the Spanish Nuclear Power Plants (S.R.T. Project)

    International Nuclear Information System (INIS)

    Bielza, M.; Gomez, J.; Izquierdo, J.A.; Bercedo, A.; Espallardo, J.A.; Martinez, A.; Carmena, P.; Pascual, J.L.

    1998-01-01

    The main objective of the Teleoperated Robotic Systems project (SRT) is the development of teleoperated robotic systems for use in the inspection, surveillance and maintenance operations in nuclear and radioactive installations. These systems make possible the reduction of the individual and collective doses of the workers that undertake these operations, as well as an increase of plant availability as it is possible to carry out specific tasks of inspection and surveillance in high radiation dose areas without to reduce the power of the installation. This project started in 1995 deciding to priorize the inspection equipment in a first phase. As a result of this work currently several semi-industrial products are available: ROBCAR, ROBICEN y ANAES. These have been installed for testing and commercial operation in Spanish nuclear installations. In this paper the experience of using these prototypes in the S.M. de Garona and Cofrentes nuclear power plants is described, as well as the improvements in the design of these systems derived from these experiences that have been incorporated to the industrial prototypes that are currently in the last phase of development. (Author)

  9. Fuel switching in power-plants: Modelling and impact on the analysis of energy projects

    International Nuclear Information System (INIS)

    Varympopiotis, G.; Tolis, A.; Rentizelas, A.

    2014-01-01

    Highlights: • The impact of fuel-switching in electricity generation is researched. • 15 Scenarios of fuel-technology combinations are compared using a computational model. • Fuel-switching results to higher yields compared to single-fuelled plants. • Plants with natural gas combined cycle and solid fuel supercritical boilers are optimal. • Fuel-switching, offers higher flexibility and security of fuel supply. - Abstract: In electricity markets, where conditions are uncertain, the choice of the best technology and the optimisation of production processes may not anymore be enough to ensure optimal investment yield of energy business plans. Providing some aspects of flexibility might enhance their financial performance; fuel switching may prove to be an alternative option, offering operational flexibility over time, as well as significant financial benefits. Traditional investment analysis methods are considered marginally useful to analyse this case. Instead, the recent tools of time-dependent investment analysis are more appropriate, since they are not inherently restricted to immediate, irreversible decisions. In the present work, a time-dependent computational model is presented and applied in the case study of the Greek Power Sector, in order to estimate the potential advantages of the fuel switching concept. Moreover, the optimal timing of switching is derived, to ensure increasing yields of an average-capacity power-plant. The results of the research indicate significant financial benefits anticipated in most scenarios from applying fuel switching, compared to single-fuelled electricity generation units. Security of fuel supply and enhanced flexibility may also be offered to the power plant since more than one technology and fuels may be engaged

  10. Quality Assurance in the Vandellos 1 Nuclear Power Plant Dismantling and Decommissioning Project

    International Nuclear Information System (INIS)

    Soto Lanuza, A.

    2000-01-01

    General description of the Quality Assurance System established and implemented for the efficient development of the current activities specified in the Dismantling and Decommissioning Plan for Vandellos I Nuclear Power Plant. Aspects related to the Quality organization, scope and applicability on the established Quality Assurance Manual, availability of requirements and recommendations on quality as well as actions to be taken for the correct verification on the quality and practical application of the Manual should be described. (Author)

  11. The mathematical modelling of plant behaviour: an evolutionary history and forward projection: Pt. 3

    International Nuclear Information System (INIS)

    Whitmarsh-Everiss, M.J.

    1993-01-01

    The two previous articles in this series considered the evolution of analogue and hybrid computing techniques using examples from Magnox and advanced gas cooled reactor design. The parallel deployment and development of digital computing was discussed in relation to the simulation languages of the day which culminated in the formal release of the Plant Modelling Systems Program, PMSP. It is now proposed to trace the history from 1980 to the present day and discuss the highly sophisticated interactive digital computing environment known as the Plant Design Analyser. A backward step will be taken in time to look at the parallel and evolving design of Plant Operator Training Simulators. Once again, the development of these facilities had to track the evolving computer architectures and developments in computing science. During this period modelling disciplines and methodologies became formalised and were enshrined in elaborate Computer Aided Design Suites. However, they were consolidated at the end of our story. It is first our intention to discuss the simulation language PMSP as this is the foundation of the explanation which follows. (author)

  12. Experience and projects concerning treatment, conditioning and storage of all radioactive wastes from Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Fukuda, G.; Matsumoto, K.; Miyahara, K.

    1984-01-01

    The active operation of Tokai reprocessing plant started in September 1977, and about 170 t U of spent fuel were reprocessed between then and December 1982. During this period, the low-level waste processing plant reduced the amount of radioactivity discharged into the environment. For radioactive liquid waste, the treatment procedures consist mainly of evaporation to keep the discharge into the sea at a low level. For combustible low-level solid waste and the solvent waste, which is of low tributyl phosphate content, incineration has been used successfully (burned: about 150 t of combined LLSW, about 50 m 3 of solvent waste, i.e. diluent waste). Most of the past R and D work was devoted to reducing the activity discharged into the environment. Current R and D work is concerned with the treatment of solvent waste, the conditioning of solid wastes, the bituminization of low-level liquid waste and the vitrification of high-level liquid waste. The paper describes present practices, R and D work and future aspects of the treatment, conditioning and storage of all radioactive wastes from Tokai reprocessing plant. (author)

  13. The steam generator repair project of the Donald C. Cook Nuclear Plant, Unit 2

    International Nuclear Information System (INIS)

    White, J.D.

    1993-01-01

    Donald C. Cook Nuclear Plant Unit 2 is part of a two unit nuclear complex located in southwestern Michigan and owned and operated by the Indiana Michigan Power Company. The Cook Nuclear Plant is a pressurized water reactor (PWR) plant with four Westinghouse Series 51 steam generators housed in an ice condenser containment. This paper describes the program undertaken by Indiana Michigan Power and the American Electric Power Service Corporation (AEPSC) to repair the Unit 2 steam generators. (Both Indiana Michigan Power and AEPSC arc subsidiaries of American Electric Power Company, Incorporated (AEP). AEPSC provides management and technical support services to Indiana Michigan Power and the other AEP operating companies.) Eddy current examinations, in a series of refueling and forced outages between November 1983 and July 1986 resulted in 763 (5.6%) plugged tubes. In order to maintain adequate reactor core cooling, a limit of 10% is placed on the allowable percentage of steam generator tubes that can be removed from service by plugging. Additionally, sections of tubes were removed for metallurgical analysis and confirmed that the degradation was due to intergranular stress corrosion cracking. In developing the decision on how to repair the steam generators, four alternative actions were considered for addressing these problems: retubing in place, sleeving, operating at 80% reactor power to lower temperature and thus reduce the rate of corrosion, replacing steam generator lower assemblies

  14. Project financing consequences on cogeneration: industrial plant and municipal utility co-operation in Sweden

    International Nuclear Information System (INIS)

    Sundberg, Gunnel; Sjoedin, J.Joergen

    2003-01-01

    The liberalisation of the European electricity market influences investment decisions in combined heat and power plants. Energy companies modify their business strategies and their criteria for investments in power generation capacity. In this paper, the gains from a co-operation between a paper mill and municipal utility are studied. We find that a widened system boundary, including both the industrial plant and the district heating company, increases cost-effectiveness by 7-11%, compared to a situation with two separately optimised systems. Furthermore, optimal investments are strongly influenced by the actors' different required returns. With a relatively low required rate of return on energy investments, typical for a municipally owned utility, the most profitable investment is a wood chips-fuelled cogeneration plant. With a higher rate of return on capital, typical for a competitive industry, the optimal investment is mainly a heat-only steam boiler. Finally, some general influences on required rate of return caused by electricity market deregulation are observed. Whilst tending to increase companies' required returns, deregulation may, besides extending the outlet for locally generated electricity, also obstruct long-term high-cost investments such as cogeneration based on conventional technology

  15. Selected natural and fallout radionuclides in plant foods around the Kudankulam Nuclear Power Project, India

    International Nuclear Information System (INIS)

    Ross, E. Mahiban; Raj, Y. Lenin; Wesley, S. Godwin; Rajan, M.P.

    2013-01-01

    The activity concentrations of certain radionuclides were quantified in some plant foods cultivated around Kudankulam, where a mega-nuclear power plant is being established. The activity concentrations were found more in the ‘pulses’ group and were the lowest in ‘other vegetable’ category. The annual effective dose was computed based on the activity concentration of radionuclides and it was found to be higher due to the consumption of cereals and pulses. Other vegetables, cereals, pulses and nuts recorded high transfer factors for the radionuclide 228 Ra. Fruits, leafy vegetables, tubers and roots, and palm embryo registered high transfer factors for 226 Ra. Group-wise activity concentration, radiation dose to the public and soil-plant-to-transfer factor are discussed in detail. Highlights: ► Fallout radionuclides ( 90 Sr and 137 Cs) were below the limit of detection. ► 228 Ra activities were higher than 226 Ra activity concentrations. ► ‘Pulses’ group (leguminous grains) was the highest accumulator of radium nuclides. ► 228 Ra transfer factor was higher in few groups while 226 Ra was higher in others.

  16. Advance: research project on aging electrical wiring in nuclear power plants; Advance: proyecto de investigacion de envejecimiento en cableado electrico en centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Cano, J. C.; Ruiz, S.

    2013-07-01

    As Nuclear Power Plants get older it is more important to know the real condition of low voltage, instrumentation, power and control cables. Additionally, as new plants are being built, the election of cables and the use of in-situ monitoring techniques to get reliable aging indicators, can be very useful during the plant life. The goal of this Project is to adapt, optimize and asses Condition Monitoring techniques for Nuclear Power Plants cables. These techniques, together with the appropriate acceptance criteria, would allow specialists to know the state of the cable over its entire length and estimate its residual life. In the Project, accelerated ageing is used in cables installed in European NPPs in order to evaluate different techniques to detect local and global ageing. Results are compared with accepted tests to validate its use for the estimation of cables residual life. This paper describes the main stages of the Project and some results. (Author)

  17. Research projects into the safety of nuclear power plants. Period cover 01. January - 30. June 2017. Progress report

    International Nuclear Information System (INIS)

    2017-01-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fur Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/ Authority Support Division of GRS. The reports as of the year 2000 are available in the internet-based information system on results and data of reactor safety research (https://www.grs-fbw.de). The compilation of the reports is classified according to the topic areas of reactor safety research. The reports are arranged in sequence of their project numbers. Ilt has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  18. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE's instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department's obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act

  19. Defense waste solidification studies, 200-S area. Savannah River Plant work request 860504, Project S-1780

    International Nuclear Information System (INIS)

    1977-05-01

    A scope of work and a venture guidance appraisal were prepared for a conceptual process and plant facilities for the solidification and long-term storage of radioactive wastes removed from underground storage tanks in the 241 F and H Areas at the Savannah River Plant. Conceptual design was based on incorporating the highly radioactive waste components in a borosilicate type glass. The scope of work describes facilities for: reclaiming liquid and sludge wastes from F and H area tank farms; separating the sludge from the liquid salt solution by physical processes; removing radioactive cesium from the salt solution by ion exchange techniques; incorporating the dried sludge and cesium in a borosilicate glass in stainless steel containers; evaporating the liquid salt solution and encapsulating the resulting salt cake in a stainless steel container; and storing two years' worth of glass and salt containing cyclinders in separate retrievable surface storage facilities. Operations are to be located in a new area, designated the 200-S area. A full complement of power, general, and service facilities are provided. The venture guidance appraisal based on FY 82 authorization and FY 87 turnover is $2,900,000,000. The figure is suitable for planning purposes only. The Glass-form Waste Case is a variation of the concrete-form waste case (or the Reference Plant Case) reported in DPE--3410. The new venture guidance appraisal for the concrete-form case (updated to a consistent time basis with the glass-form case) is $2,900,000,000, indicating no apparent cost advantage between the two waste product forms

  20. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  1. Comparative analysis of structural concrete quality assurance practices on nine nuclear power plant construction projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.L. Jr.

    1978-06-01

    The basic objective of this research effort was to perform a comparative analysis of the Quality Assurance practices related to the structural concrete phase on nine nuclear power plant projects which are (or have been) under construction in the United States in the past ten years. This analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects. For those aspects of the Quality Assurance system which can be considered managerial in nature (i.e., organizational relationships, types of Quality Assurance programs, corrective action procedures, etc.) an attempt has been made to present the alternative approaches that were identified. For those aspects of the Quality Assurance system which are technical in nature (i.e., the frequency of testing for slump, compressive strength, etc.) an attempt has been made to present a comparative analysis between projects and in relation to the recommended or mandated practices presented in the appropriate industry codes and standards.

  2. Comparative analysis of structural concrete quality assurance practices on nine nuclear power plant construction projects. Final report

    International Nuclear Information System (INIS)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.L. Jr.

    1978-06-01

    The basic objective of this research effort was to perform a comparative analysis of the Quality Assurance practices related to the structural concrete phase on nine nuclear power plant projects which are (or have been) under construction in the United States in the past ten years. This analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects. For those aspects of the Quality Assurance system which can be considered managerial in nature (i.e., organizational relationships, types of Quality Assurance programs, corrective action procedures, etc.) an attempt has been made to present the alternative approaches that were identified. For those aspects of the Quality Assurance system which are technical in nature (i.e., the frequency of testing for slump, compressive strength, etc.) an attempt has been made to present a comparative analysis between projects and in relation to the recommended or mandated practices presented in the appropriate industry codes and standards

  3. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  4. Feasibility study on the St. Petersburg City heat and electric cogeneration plant No.2, etc. scrap and build project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions in line with the Joint Implementation, a survey was made of the scrap and build project for the superannuated Central Heat Power Station in St. Petersburg City. The survey team visited the relevant sites twice during 1999. The team drafted an improvement plan afterwards and presented it to the Russian counterpart, LENENEGRO. Based on the discussions with LENENEGRO, it was determined that the proposed combined cycle cogeneration plant would contain three 67MW-class gas turbines, three heat recovery steam generators and one back pressure turbine to achieve the generation capacity of approximately 200MW and heat supply capacity of 200G cal/hr. The total investment required for this project is about 140 million dollars. The term of the construction work is estimated at 36 months. It is estimated that the implementation of the project will reduce 1,481,979 tons of CO2 per year, or a total of 40,013,434 tons in 27 years after the commencement of operation. In addition, the terminal power generation efficiency will be improved from the current 18.68% to 41%, which leads to an annual fuel saving of 546,301 tons of crude oil or its equivalent. (NEDO)

  5. Reliability Data for Piping Components in Nordic Nuclear Power Plants 'R-Book'. Project Phase 1. Rev 1

    International Nuclear Information System (INIS)

    Lydell, Bengt; Olsson, Anders

    2008-01-01

    This report constitutes a planning document for a new RandD project to develop a piping component reliability parameter handbook for use in probabilistic safety assessment (PSA) and related activities. The Swedish acronym for this handbook is 'R-Book.' The objective of the project is to utilize the OECD Nuclear Energy Agency 'OECD Pipe Failure Data Exchange Project' (OPDE) database to derive piping component failure rates and rupture probabilities for input to internal flooding probabilistic safety assessment, high-energy line break' (HELB) analysis, risk-informed in-service inspection (RI-ISI) program development, and other activities related to PSA. This new RandD project is funded by member organizations of the Nordic PSA Group (NPSAG) - Forsmark AB, OKG AB, Ringhals AB, and the Swedish Nuclear Power Inspectorate (SKI). The history behind the current effort to produce a handbook of piping reliability parameters goes back to 1994 when SKI funded a 5-year RandD project to explore the viability of establishing an international database on the service experience with piping system components in commercial nuclear power plants. An underlying objective behind this 5-year program was to investigate the different options and possibilities for deriving pipe failure rates and rupture probabilities directly from service experience data as an alternative to probabilistic fracture mechanics. The RandD project culminated in an international piping reliability seminar held in the fall of 1997 in Sigtuna (Sweden) and a pilot project to demonstrate an application of the pipe failure database to the estimation of loss-of-coolant-accident (LOCA) frequency (SKI Report 98:30). A particularly important outcome of the 5-year project was a decision by SKI to transfer the pipe failure database including the lessons learned to an international cooperative effort under the auspices of the OECD Nuclear Energy Agency. Following on information exchange and planning meetings that were

  6. Reliability Data for Piping Components in Nordic Nuclear Power Plants 'R-Book'. Project Phase 1. Rev 1

    Energy Technology Data Exchange (ETDEWEB)

    Lydell, Bengt (Scandpower Risk Management Inc., Houston, TX (US)); Olsson, Anders (Relcon Scandpower AB, Stockholm (SE))

    2008-01-15

    This report constitutes a planning document for a new RandD project to develop a piping component reliability parameter handbook for use in probabilistic safety assessment (PSA) and related activities. The Swedish acronym for this handbook is 'R-Book.' The objective of the project is to utilize the OECD Nuclear Energy Agency 'OECD Pipe Failure Data Exchange Project' (OPDE) database to derive piping component failure rates and rupture probabilities for input to internal flooding probabilistic safety assessment, high-energy line break' (HELB) analysis, risk-informed in-service inspection (RI-ISI) program development, and other activities related to PSA. This new RandD project is funded by member organizations of the Nordic PSA Group (NPSAG) - Forsmark AB, OKG AB, Ringhals AB, and the Swedish Nuclear Power Inspectorate (SKI). The history behind the current effort to produce a handbook of piping reliability parameters goes back to 1994 when SKI funded a 5-year RandD project to explore the viability of establishing an international database on the service experience with piping system components in commercial nuclear power plants. An underlying objective behind this 5-year program was to investigate the different options and possibilities for deriving pipe failure rates and rupture probabilities directly from service experience data as an alternative to probabilistic fracture mechanics. The RandD project culminated in an international piping reliability seminar held in the fall of 1997 in Sigtuna (Sweden) and a pilot project to demonstrate an application of the pipe failure database to the estimation of loss-of-coolant-accident (LOCA) frequency (SKI Report 98:30). A particularly important outcome of the 5-year project was a decision by SKI to transfer the pipe failure database including the lessons learned to an international cooperative effort under the auspices of the OECD Nuclear Energy Agency. Following on information exchange and planning

  7. Y-12 Plant Decontamination and Decommissioning Program

    International Nuclear Information System (INIS)

    1992-01-01

    The Decontamination and Decommissioning (D and D) Program at the Oak Ridge Y-12 Plant is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide Y-12 the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER program. The D and D Program provides collective management of sites within the Plant which are in need of decontamination and decommissioning efforts, prioritizes those areas in terms of health, safety, and environmental concerns, and implements the appropriate level of remedial action. The D and D Program provides support to identifiable facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each facility has been prepared. This report provides this documentation for the Y-12 facilities currently included in the D and D Program, as well as those planned for future inclusion in the Program, and includes projected resource requirements for the planning period of FY 1993 through FY 2000

  8. Economic-financial analysis of 'Angra 3 Nuclear Power Plant' project; Analise economico-financeira do empreendimento 'Usina Nuclear Angra 3'

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Ronaldo Barata de [ELETROBRAS Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)]. E-mail: rbarata@eletronuclear.gov.br

    2005-07-01

    This paper presents an economic-financial evaluation of 'Angra 3 Nuclear Power Plant' project and estimates the lowest power tariff value at which power potentially made available may be commercialized and yet ensure the project a profitability level agreeable to the interests of economic agents and shareholders. According to the 'project evaluation' practice, Angra 3 power generation was considered separately from ELETRONUCLEAR's operating plants (Angra 1 and Angra 2), thus preventing result distortions bound to occur if the economic-financial variables of the new project were analyzed associated with financial commitments and commercialization conditions resulting from the project implementation process and the generated power commercialization conditions, respectively. For this evaluation different technical and economic scenarios were devised, and the theory of Capital Asset Pricing Model for Own Capital cost and that of Weighted Average Cost of Capital were used in addition to the forecast of the Statement of Results and Free Cash flow of Shareholders throughout the power plant life, which is the estimate basis for the lowest power tariff value and the Internal Return Rate of the project. The evaluation conclusion is that Angra 3 project is technically and economically feasible and competitive as compared to the new large power generation projects planned for power supply in Brazil in the next decade, mainly in the Southeast. (author)

  9. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    International Nuclear Information System (INIS)

    Huber, T.E.

    1995-01-01

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ''Low Level Waste Treatment Facility'' and C-031H ''PFP Liquid Effluent Facilities''. Part of the new en's change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site

  10. R and D on robots for nuclear power plants in 'advanced robot technology' project

    International Nuclear Information System (INIS)

    Ando, Hiroaki

    1987-01-01

    The project aims at developing a safe man-robot system of high mobility and workability, highly adaptable to the working environment, and readily and reliably remote-controlled. The plan is to develop 'multi-purpose robots' that can do monitoring, inspection and light work quickly and correctly in areas where access of humans is difficult (e.g. hot spots and the inner space of the primary containment vessel), and 'robots used exclusively for valves, pumps, and other equipment, multi-functional to be used only for specific purposes'. This can be expected to be completed on the basis of results in research and development for the multi-purpose robots. R and D on the total system means manufacturing an optimum system with sufficient functions and performance required for the robot by combining existing technologies most adequately on the basis of the results of research and development on the project. After conceptual drawing and conceptual design, the system will be manufactured and demonstration tests will be completed by fiscal 1987 or 1988. This report describes the total image of the robots concerning the shape, locomotion, manipulation, perception, communication, control management, reliability and environmental durability, and then outlines the research and development activities regarding locomotion, manipulator, tectile sensor, actuator, single-eye three-dimensional measurement, visual data processing, optical spacial transmission, failure repair controller, functional reduction, robot health care and radiation resistance. (Nogami, K.)

  11. Safety Culture in Pre-operational Phases of Nuclear Power Plant Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-09-15

    An abundance of information exists on safety culture related to the operational phases of nuclear power plants; however, pre-operational phases present unique challenges. This publication focuses on safety culture during pre-operational phases that span the interval from before a decision to launch a nuclear power programme to first fuel load. It provides safety culture insights and focuses on eight generic issues: safety culture understanding; multicultural aspects; leadership; competencies and resource competition; management systems; learning and feedback; cultural assessments; and communication. Each issue is discussed in terms of: specific challenges; desired state; approaches and methods; and examples and resources. This publication will be of interest to newcomers and experienced individuals faced with the opportunities and challenges inherent in safety culture programmes aimed at pre-operational activities.

  12. Summary of project to develop handbook of human reliability analysis for nuclear power plant operations

    International Nuclear Information System (INIS)

    Swain, A.D.

    1978-01-01

    For the past two years Alan Swain and Henry E. Guttmann, of the Statistics, Computing, and Human Factors Division, Sandia Laboratories, have been developing a handbook to aid qualified persons to evaluate the effect of human error on the availability of engineered safety systems and features in nuclear power plants. The handbook includes a mathematical model, procedures, derived human failure data, and principles of human behavior and ergonomics. The handbook is expanding the human error analyses which were presented in WASH--1400. The work, under the sponsorship of Probabilistic Analysis Staff, NRC Office of Nuclear Regulatory Research (Dr. M.C. Cullingford, NRC Program Manager), is about half completed. An outline of the handbook contents is given in copies of vugraphs (attached), followed by copies of human performance model abstractors (also attached). A first draft of the handbook is scheduled for NRC review by July 1, 1979

  13. Savannah River Plant Low-Level Waste Heat Utilization Project preliminary analysis. Volume I. Executive summary

    International Nuclear Information System (INIS)

    1978-11-01

    A preliminary feasibility study of capturing energy ejected in hot water at the Savannah River Plant (SRP) is presented. The cooling water, drawn from the river or a pond at the rate of 500,000 gallons per minute, is typically heated 80 0 F to about 150 0 F and is then allowed to cool in the atmosphere. The energy added to the water is equivalent to 20 million barrels of oil a year. This study reports that the reject heat can be used directly in an organic Rankine cycle system to evaporate fluids which drive electric generators. The output of one reactor can produce 45,000 kilowatts of electricity. Since the fuel is waste heat, an estimated 45% savings over conventional electric costs is possible over a thirty year period

  14. Design and construction of the defense waste processing facility project at the Savannah River Plant

    International Nuclear Information System (INIS)

    Baxter, R.G.

    1986-01-01

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level radioactive waste at the Savannah River Plant (SRP) near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes by immobilizing the waste in Processing Facility (DWPF) will solidify existing and future radioactives wastes by immobilizing the waste in borosilicate glass contained in stainless steel canisters. The canisters will be sealed, decontaminated and stored, prior to emplacement in a federal repository. At the present time, engineering and design is 90% complete, construction is 25% complete, and radioactive processing in the $870 million facility is expected to begin by late 1989. This paper describes the SRP waste characteristics, the DWPF processing, building and equipment features, and construction progress of the facility

  15. Reference stratigraphy and rock properties for the Waste Isolation Pilot Plant (WIPP) project

    International Nuclear Information System (INIS)

    Krieg, R.D.

    1984-01-01

    A stratigraphic description of the country rock near the working horizon at the Waste Isolation Pilot Plant (WIPP) is presented along with a set of mechanical and thermal properties of materials involved. Data from 41 cores and shafts are examined. The entire stratigraphic section is found to vary in elevation in a regular manner, but individual layer thicknesses and relative separation between layers are found to have no statistically significant variation over the one mile north to south extent of the working horizon. The stratigraphic description is taken to be relative to the local elevation of Anhydrite b. The material properties have been updated slightly from those in the July 1981 Reference Stratigraphy. This reference stratigraphy/properties document is intended primarily for use in thermal/structural analyses. This document supercedes the July 1981 stratigraphy/properties document. 31 references, 7 figures

  16. Development and delivery of a workshop methodology: planning for biomass power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Gray, A.J.; Delbridge, P.; Trevorrow, E.; Pile, C.

    2001-07-01

    This report gives details of the approach used to develop a workshop methodology to help planners and stakeholders address key issues that may arise when submitting a planning application for a biomass power plant in the light of the UK government's energy and climate change targets. The results of interviews with stakeholders (central government, regulatory authorities, developers, planners, non-governmental organisations, local community, resident groups) are summarised, and the NIMBY (not in my back yard) syndrome, the lack of trust in the developer, and lack of awareness of the use of biomass are discussed. Details are given of the design and testing of the workshop methodology and the resulting workshop methodology and workbook guide aimed at understanding the stakeholder issues and concerns through stakeholder discussions.

  17. Safety Culture in Pre-operational Phases of Nuclear Power Plant Projects

    International Nuclear Information System (INIS)

    2012-01-01

    An abundance of information exists on safety culture related to the operational phases of nuclear power plants; however, pre-operational phases present unique challenges. This publication focuses on safety culture during pre-operational phases that span the interval from before a decision to launch a nuclear power programme to first fuel load. It provides safety culture insights and focuses on eight generic issues: safety culture understanding; multicultural aspects; leadership; competencies and resource competition; management systems; learning and feedback; cultural assessments; and communication. Each issue is discussed in terms of: specific challenges; desired state; approaches and methods; and examples and resources. This publication will be of interest to newcomers and experienced individuals faced with the opportunities and challenges inherent in safety culture programmes aimed at pre-operational activities.

  18. Ashes from straw and wood-chip fired plants for agricultural usage. Pilot project

    International Nuclear Information System (INIS)

    Morsing, M.; Westborg, S.

    1994-08-01

    The content of nutrients and heavy metals in ashes from the combustion of straw and wood chips at district heating plants is studied, on the basis of results of analyses from Danish municipalities, to determine whether such ashes are suitable for use as fertilizers. Results of the analysis of ashes from 9 wood-chip fired and 26 straw-fired plants are presented. They show significant variations in nutrient and heavy metal content which could be caused by combustion and operational conditions and/or testing methods. On condition that the phosphorous content of straw and wood-chip ashes amount to 1% of the dry matter, 50%-75% of the straw ashes and under 50% of wood chip ashes analyses are within the limit for cadmium stipulated in the Danish Ministry of the Environment's Executive Order no. 736 on the use of wastes for agricultural purposes. This is found to be unsatisfactory. It is suggested that a closer investigation should be undertaken in order to determine which amount of straw and wood-chip ashes can be accepted for use as fertilizers in consideration of the stipulated limits for cadmium content of wastes to be used for agricultural purposes. In addition the technological and economic potentials of dosing of these ashes for this use should be investigated. Fly ash and slag were also included in the analysis results studied and it was found that the cadmium content of slag did not prevent its use as fertilizer, but that the distribution of cadmium in slag, in fly ash and in slam from flue gas cleaning systems related to the combustion of wood chips should be further investigated. (AB)

  19. Planning your first wind power project. A primer for utilities: Everything you need to know to bring your first wind power plant on-line

    International Nuclear Information System (INIS)

    Conover, K.; Davis, E.

    1994-12-01

    This primer has been prepared to help utility personnel become familiar with some or the details relative to wind power technology and project development. It is written as a series of relatively independent chapters to address specific topics or phases of wind power evaluation and development as they might occur within a utility. The topics include: wind prospecting and the first pass analysis, resource validation, project feasibility, resource planning and evaluation, resource acquisition, project development, equipment selection, project design and construction, and plant operation and maintenance

  20. Housing projects in Trabzon: Marketting discourses and physical environmental features

    OpenAIRE

    AYDIN TÜRK, Yelda; KARADENİZ, Beyza

    2018-01-01

    Thehousing projects, that have turned into concept projects promoted as acommodity since last decade in Turkey. These projects, are marketed withdiscourses such as “the long-awaited life”, “ideal home” and are constructed onthe urban fringes. In this study, the housing projects that developed inTrabzon in recent years have been examined in this context. Marketing discourseand physical environmental characteristics of the projects have been analyzed.Thus, the study finds out to what extent the...

  1. The Hungarian model project: Strengthening training for operational safety at Paks nuclear power plant

    International Nuclear Information System (INIS)

    Mautner Markhof, F.

    1998-01-01

    The Hungarian Model project (HMP) reflects the commitment to constant increase of safety and reliability of the NPP Paks, the Government of Hungary and the IAEA. It includes some of the most important nuclear power objectives of Paks NPP, namely the strengthening of NPP personnel training and competence through the application of international best practice, the systematic approach to training (SAT), for training operation and maintenance personnel; setting up a state of-the-art maintenance training center (MTC) at Paks and enhancing safety culture at Paks NPP. The IAEA supported implementation of the HMP through fellowships and scientific visits, expert missions, provision of hardware and software for SAT application, and supply od major new uncontaminated items of actual WWER equipment for the MTC

  2. Preliminary analysis of projected construction employment effects of building the defense waste processing facility at the Savannah River Plant

    International Nuclear Information System (INIS)

    Garey, R.B.; Blair, L.M.; Craig, R.L.; Stevenson, W.

    1981-09-01

    This study estimates the probable effects of constructing the DWPF on the surrounding labor markets. Analyses are based on data from the local and regional labor markets, information from experts on local construction activities, information on the labor requirements of the Vogtle Power Plant (two nuclear reactors) being built by Georgia Power Company in Burke County, Georgia, and an econometric model of the construction labor market, based on several surveys of workers building three Tennessee Valley Authority nuclear power plants. The results of this study are reported in three parts. In Part I, completed in May 1980, we describe the 1979 (base year) employment levels within the local and regional labor markets surrounding SRP, from which most DWPF construction workers are likely to be drawn. In Part II, completed in June 1980, we define the four local sources of construction employment that will compete for craftsmen when DWPF is built. Also in Part II, most of the projected impacts of the DWPF reference immobilization alternative (one of several alternatives that may be chosen) are reported. Several construction schedules and labor demand scenarios for the reference alternative are considered. In Part III, completed in January 1981, most of the estimated impacts of the DWPF alternative referred to as the staged process alternative are reported. Several construction schedules and labor demand scenarios for this alternative are considered

  3. Assessing and monitoring impacts of genetically modified plants on agro-ecosystems: the approach of AMIGA project

    Directory of Open Access Journals (Sweden)

    S. Arpaia

    2014-06-01

    Full Text Available The environmental impacts of genetically modified crops is still a controversial issue in Europe. The overall risk assessment framework has recently been reinforced by the European Food Safety Authority(EFSA and its implementation requires harmonized and efficient methodologies. The EU-funded research project AMIGA − Assessing and monitoring Impacts of Genetically modified plants on Agro-ecosystems − aims to address this issue, by providing a framework that establishes protection goals and baselines for European agro-ecosystems, improves knowledge on the potential long term environmental effects of genetically modified (GM plants, tests the efficacy of the EFSA Guidance Document for the Environmental Risk Assessment, explores new strategies for post market monitoring, and provides a systematic analysis of economic aspects of Genetically Modified crops cultivation in the EU. Research focuses on ecological studies in different EU regions, the sustainability of GM crops is estimated by analysing the functional components of the agro-ecosystems and specific experimental protocols are being developed for this scope.

  4. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

  5. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    International Nuclear Information System (INIS)

    1994-09-01

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included

  6. Association of Fatigue with Perceived Stress in Chinese Women with Early Stage Breast Cancer Awaiting Adjuvant Radiotherapy.

    Science.gov (United States)

    Ho, Rainbow T H; Kwan, Tracy T C; Cheung, Irene K M; Chan, Caitlin K P; Lo, Phyllis H Y; Yip, Paul S F; Luk, Mai-Yee; Chan, Cecilia L W

    2015-08-01

    Cancer-related fatigue (CRF) is common in women with breast cancer, but little is known of its relationship with perceived stress. We conducted a cross-sectional study to explore the associations of CRF with perceived stress, anxiety, depression, pain and sleep quality in 133 Chinese women (aged 25-68 years) with early stage breast cancer. The majority of women had completed surgery and chemotherapy and were awaiting radiotherapy. Self-administered questionnaires consisting of the Brief Fatigue Inventory, Perceived Stress Scale-10, Hospital Anxiety and Depression Scale, Brief Pain Inventory, and Pittsburgh Sleep Quality Index were used to collect data. Forty-five per cent of the women were severely fatigued. Compared with local healthy women and US breast cancer patients, the group's mean perceived stress score was significantly higher (both p stress (β = 0.18, p = 0.032), higher anxiety (β = 0.30, p stress was partially mediated by anxiety, suggesting a possible pathway from cancer and cancer treatment to CRF via stress appraisals and emotional distress. The findings indicate the importance of monitoring the psychological status of patients during treatment. Copyright © 2013 John Wiley & Sons, Ltd.

  7. The SKI-project External events - Phase 2. Estimation of fire frequencies per plant and per building

    International Nuclear Information System (INIS)

    Poern, K.

    1996-08-01

    The Swedish-Finnish handbook for initiating event frequencies, I-Book, does not contain any fire frequencies. This matter of fact is not defensible considering the substantial risk contribution caused by fires. In the PSAs performed hitherto the initiating fire frequencies have been determined from case to case. Because data are usually very scarce in these areas it is very important to develop unique definitions, to systematically utilize both international and national experiences and to establish an appropriate statistical estimation method. It is also important to present the accumulated experience such that it can be used for different purposes, not only within PSA but also in the concrete fire preventive work. During phase 1 of the project External Events an inventory was made of existing methods for probabilistic fire analysis in general. During phase 2 of the project it was decided to initialize the work on a complementary handbook, called X-Book, in order to encompass the frequencies of system external events, i.e. initiating events that are caused by events occurring outside the system boundaries. In Version 1 of the X-Book the attention is mainly focussed on the estimation of initiating fire frequencies, per plant and per building. This estimation is basically founded on reports that the power companies have collected for this specific purpose. This report describes the statistical model and method that have been used in the estimation process. The methodological results achieved may, possibly after some modification, be applicable also to other types of system external events

  8. The Ohio River Valley CO2 Storage Project AEP Mountaineer Plant, West Virginia Numerical Simulation and Risk Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Neeraj Gupta

    2008-03-31

    A series of numerical simulations of carbon dioxide (CO{sub 2}) injection were conducted as part of a program to assess the potential for geologic sequestration in deep geologic reservoirs (the Rose Run and Copper Ridge formations), at the American Electric Power (AEP) Mountaineer Power Plant outside of New Haven, West Virginia. The simulations were executed using the H{sub 2}O-CO{sub 2}-NaCl operational mode of the Subsurface Transport Over Multiple Phases (STOMP) simulator (White and Oostrom, 2006). The objective of the Rose Run formation modeling was to predict CO{sub 2} injection rates using data from the core analysis conducted on the samples. A systematic screening procedure was applied to the Ohio River Valley CO{sub 2} storage site utilizing the Features, Elements, and Processes (FEP) database for geological storage of CO{sub 2} (Savage et al., 2004). The objective of the screening was to identify potential risk categories for the long-term geological storage of CO{sub 2} at the Mountaineer Power Plant in New Haven, West Virginia. Over 130 FEPs in seven main classes were assessed for the project based on site characterization information gathered in a geological background study, testing in a deep well drilled on the site, and general site conditions. In evaluating the database, it was apparent that many of the items were not applicable to the Mountaineer site based its geologic framework and environmental setting. Nine FEPs were identified for further consideration for the site. These FEPs generally fell into categories related to variations in subsurface geology, well completion materials, and the behavior of CO{sub 2} in the subsurface. Results from the screening were used to provide guidance on injection system design, developing a monitoring program, performing reservoir simulations, and other risk assessment efforts. Initial work indicates that the significant FEPs may be accounted for by focusing the storage program on these potential issues. The

  9. Impact of an Educational Hands-on Project on the Antimicrobial, Antitumor and Anti-Inflammatory Properties of Plants on Portuguese Students’ Awareness, Knowledge, and Competences

    Directory of Open Access Journals (Sweden)

    Maria-Manuel Azevedo

    2015-02-01

    Full Text Available Promoting environmental and health education is crucial to allow students to make conscious decisions based on scientific criteria. The study is based on the outcomes of an Educational Project implemented with Portuguese students and consisted of several activities, exploring pre-existent Scientific Gardens at the School, aiming to investigate the antibacterial, antitumor and anti-inflammatory properties of plant extracts, with posterior incorporation in soaps and creams. A logo and a webpage were also created. The effectiveness of the project was assessed via the application of a questionnaire (pre- and post-test and observations of the participants in terms of engagement and interaction with all individuals involved in the project. This project increased the knowledge about autochthonous plants and the potential medical properties of the corresponding plant extracts and increased the awareness about the correct design of scientific experiments and the importance of the use of experimental models of disease. The students regarded their experiences as exciting and valuable and believed that the project helped to improve their understanding and increase their interest in these subjects and in science in general. This study emphasizes the importance of raising students’ awareness on the valorization of autochthonous plants and exploitation of their medicinal properties.

  10. Long-awaited pregnancy

    DEFF Research Database (Denmark)

    Bay, Bjørn; Mortensen, Erik Lykke; Golombok, Susan

    2016-01-01

    (BMI), smoking and alcohol intake in pregnancy, cohabitation status, child gender, and age. Conclusion(s): In the longest follow-up of cognitive development of children conceived after fertility treatment or by subfertile parents conducted so far, this study did not show any association between......Objective: To study whether fertility treatment, subfertility, or pregnancy planning are related to long-term intellectual development. Design: Cohort study. Setting: Not applicable. Patient(s): A total of 5,032 singletons born from 1990 to 1992 in the Aarhus Birth Cohort were followed up to a mean...... age of 19 years. These children were born as a result of fertility treatment (n = 210), had subfertile parents who took more than 12 months before conceiving naturally (n = 334), had fertile parents who conceived naturally within 12 months (n = 2,661), or had parents who reported the pregnancy...

  11. Nuclear awaits 1994

    International Nuclear Information System (INIS)

    Collier, J.G.

    1992-01-01

    When the UK electricity industry was privatised, the Government stated that in 1994 it would undertake a review of the prospects for nuclear power. The future role of nuclear power will be viewed against the improved performance of the nuclear utilities; the success being achieved on the construction of Sizewell B; and the economics taking into account environmental benefits. The chairman of Nuclear Electric reviews the current position of Nuclear Power in Britain and puts the case for nuclear power in the future. (author)

  12. Fukushima Daiichi nuclear power plant accident and the project of prefectural health management survey

    International Nuclear Information System (INIS)

    Yamashita, Shunichi; Yasumura, Seiji; Suzuki, Shinichi; Hosoya, Mitsuaki; Fujimori, Keiya; Ohtsuru, Akira; Sakai, Akira; Kamiya, Kenji; Abe, Masafumi

    2012-01-01

    The Project in the title after the Accident (Mar. 11, 2011) formally started in September in Fukushima Medical University in contract with the Prefecture on the national fund, of which progress and future aspect are reported. Based on a preliminary study in June, the subsequent fundamental investigation was conducted on all prefectural residents from August with questionnaire to see individual's health state and to estimate their accumulated maximal dose (mSv/4 months after the Accident). The preliminary study above was conducted for 29 thousands residents having been supposedly exposed to high dose at regions of Yamakiya, Namie and Iitate, 15 thousands (52%) of whom replied, where 99.3% were exposed to <10 mSv with the maximum of 23.0 mSv. In the fundamental study, until the end of May, 2012, 440 thousands replies (22%) were obtained from 2.05 million postal questionnaire mails sent, whose analysis was not finished, yet the results were retuned to individuals in due order of analysis completion. Another detailed investigation started almost simultaneously, which contained examinations of ultrasonic (US) thyroid testing for residents younger than age 18 y, of detailed health and mental state/life habit of 21 thousands people in the evacuation area, and of expectant/nursing mothers. Preliminarily, the internal exposure dose rate of thyroid was found to be 0.1 mcSv/h in one subject and <0.04 in 99% of 1,080 children in the Prefecture (Mar. 24-30), and US test of 38 thousands in the evacuation area revealed 0.5% of children were necessary for secondary examination due to benign lesions in the organ. To expectant/nursing mothers, questionnaire was performed asking about the health state during pregnancy, childbirth, mental health, etc. Reply was obtained in 55% within 2011 and follow-up has been conducted when judged to be necessary. Tasks derived from all matters described above include various things, of which continued long term follow-up supports are necessary. (T.T.)

  13. Projected range contractions of European protected oceanic montane plant communities: focus on climate change impacts is essential for their future conservation.

    Science.gov (United States)

    Hodd, Rory L; Bourke, David; Skeffington, Micheline Sheehy

    2014-01-01

    Global climate is rapidly changing and while many studies have investigated the potential impacts of this on the distribution of montane plant species and communities, few have focused on those with oceanic montane affinities. In Europe, highly sensitive bryophyte species reach their optimum occurrence, highest diversity and abundance in the north-west hyperoceanic regions, while a number of montane vascular plant species occur here at the edge of their range. This study evaluates the potential impact of climate change on the distribution of these species and assesses the implications for EU Habitats Directive-protected oceanic montane plant communities. We applied an ensemble of species distribution modelling techniques, using atlas data of 30 vascular plant and bryophyte species, to calculate range changes under projected future climate change. The future effectiveness of the protected area network to conserve these species was evaluated using gap analysis. We found that the majority of these montane species are projected to lose suitable climate space, primarily at lower altitudes, or that areas of suitable climate will principally shift northwards. In particular, rare oceanic montane bryophytes have poor dispersal capacity and are likely to be especially vulnerable to contractions in their current climate space. Significantly different projected range change responses were found between 1) oceanic montane bryophytes and vascular plants; 2) species belonging to different montane plant communities; 3) species categorised according to different biomes and eastern limit classifications. The inclusion of topographical variables in addition to climate, significantly improved the statistical and spatial performance of models. The current protected area network is projected to become less effective, especially for specialised arctic-montane species, posing a challenge to conserving oceanic montane plant communities. Conservation management plans need significantly

  14. Projected range contractions of European protected oceanic montane plant communities: focus on climate change impacts is essential for their future conservation.

    Directory of Open Access Journals (Sweden)

    Rory L Hodd

    Full Text Available Global climate is rapidly changing and while many studies have investigated the potential impacts of this on the distribution of montane plant species and communities, few have focused on those with oceanic montane affinities. In Europe, highly sensitive bryophyte species reach their optimum occurrence, highest diversity and abundance in the north-west hyperoceanic regions, while a number of montane vascular plant species occur here at the edge of their range. This study evaluates the potential impact of climate change on the distribution of these species and assesses the implications for EU Habitats Directive-protected oceanic montane plant communities. We applied an ensemble of species distribution modelling techniques, using atlas data of 30 vascular plant and bryophyte species, to calculate range changes under projected future climate change. The future effectiveness of the protected area network to conserve these species was evaluated using gap analysis. We found that the majority of these montane species are projected to lose suitable climate space, primarily at lower altitudes, or that areas of suitable climate will principally shift northwards. In particular, rare oceanic montane bryophytes have poor dispersal capacity and are likely to be especially vulnerable to contractions in their current climate space. Significantly different projected range change responses were found between 1 oceanic montane bryophytes and vascular plants; 2 species belonging to different montane plant communities; 3 species categorised according to different biomes and eastern limit classifications. The inclusion of topographical variables in addition to climate, significantly improved the statistical and spatial performance of models. The current protected area network is projected to become less effective, especially for specialised arctic-montane species, posing a challenge to conserving oceanic montane plant communities. Conservation management plans need

  15. Physiotherapy for Patients with Sciatica Awaiting Lumbar Micro-discectomy Surgery: A Nested, Qualitative Study of Patients' Views and Experiences.

    Science.gov (United States)

    Boote, Jonathan; Newsome, Ruth; Reddington, Michael; Cole, Ashley; Dimairo, Munyaradzi

    2017-07-01

    Sciatica is a common clinical condition that can be extremely painful, disabling and life-changing. Whether conservative or surgical treatment for sciatica secondary to an intervertebral disc prolapse is most effective is still much debated. An important component of conservative treatment is physiotherapy, which aims to promote physical and psychological health for the patient, whilst resorption of the disc takes place. This paper reports a qualitative study of patients' views and experiences of a bespoke physiotherapy intervention for the treatment of sciatica. A qualitative study nested within a pilot randomized controlled trial of bespoke physiotherapy for the treatment of patients with sciatica awaiting lumbar microdiscectomy surgery. Patients randomized to receive bespoke physiotherapy in the intervention arm of the trial were invited to take part in semi-structured interviews. Twenty-one in-depth, semi-structured interviews took place. All interviews were recorded, fully transcribed and thematically analysed. Most patients in the sample found the physiotherapy valuable, appreciating the individual nature of the approach, the exercises to reduce pain and discomfort, techniques for improving functional spinal movement, walking and dynamic posture, and manual therapy and cardiovascular exercise. A small number did not find the physiotherapy of benefit. Sixteen patients in the sample went on to proceed with surgery, but most of these found value in having had the physiotherapy first. Many patients with sciatica appreciate the value of physiotherapy prior to surgery. Future research should examine patients' experiences of bespoke physiotherapy delivered within primary care. Copyright © 2016 The Authors Physiotherapy Research International published by John Wiley & Sons Ltd. Copyright © 2016 The Authors Physiotherapy Research International published by John Wiley & Sons Ltd.

  16. IS WAITING THE HARDEST PART? A CRITICAL STUDY OF THE EXPERIENCE OF WOMEN AWAITING BREAST BIOPSY RESULTS.

    Science.gov (United States)

    Hodgkinson, T; Govender, C; Rayne, S

    2017-06-01

    Most previous research efforts have focused on the psychological effects of receiving a cancer diagnosis rather than the period of waiting for definitive Results. Early detection of cancer is directly linked to successful treatment regimes, yet these procedures evoke significant anxiety in patients. The long wait for medical test Results in state health institutions, with one of the possible outcomes being a cancer diagnosis, means that the days of waiting can induce emotional distress before the diagnosis has even been given. Eight research collaborators were invited to, in their own voice, shed light on their individual experiences while waiting for their biopsy Results to gain an understanding of the experiences of each collaborator by letting her tell her story and to explore the possibility of shared experience between collaborators. Research collaborators at a local, government hospital kept a journal for the two-week waiting period for their biopsy Results. Shortly before receiving their Results, they took part in a short semi-structured interview to inquire about their waiting. The theoretical framework used for data interpretation is critical theory focusing on the structures within society and healthcare systems that impact on the experience of waiting. The undercurrent of critical commentary about the roles of the gender, economic, political and cultural factors that contribute to the screening experience for women in South Africa helps to shed light on the complex forces at play within the procedures. The Results indicate that for some women waiting provokes significant psychological stress which manifests in multiple psychological processes including the psychological bracing phenomenon, denial, suppression and negation of their emotional experience all perpetuated by the structures of power within the health care system. More understanding of the psychological experience of awaiting a cancer diagnosis is required and there is an important place for

  17. Physiotherapy for Patients with Sciatica Awaiting Lumbar Micro‐discectomy Surgery: A Nested, Qualitative Study of Patients' Views and Experiences

    Science.gov (United States)

    Newsome, Ruth; Reddington, Michael; Cole, Ashley; Dimairo, Munyaradzi

    2016-01-01

    Abstract Background and Purpose Sciatica is a common clinical condition that can be extremely painful, disabling and life‐changing. Whether conservative or surgical treatment for sciatica secondary to an intervertebral disc prolapse is most effective is still much debated. An important component of conservative treatment is physiotherapy, which aims to promote physical and psychological health for the patient, whilst resorption of the disc takes place. This paper reports a qualitative study of patients' views and experiences of a bespoke physiotherapy intervention for the treatment of sciatica. Methods A qualitative study nested within a pilot randomized controlled trial of bespoke physiotherapy for the treatment of patients with sciatica awaiting lumbar microdiscectomy surgery. Patients randomized to receive bespoke physiotherapy in the intervention arm of the trial were invited to take part in semi‐structured interviews. Twenty‐one in‐depth, semi‐structured interviews took place. All interviews were recorded, fully transcribed and thematically analysed. Results Most patients in the sample found the physiotherapy valuable, appreciating the individual nature of the approach, the exercises to reduce pain and discomfort, techniques for improving functional spinal movement, walking and dynamic posture, and manual therapy and cardiovascular exercise. A small number did not find the physiotherapy of benefit. Sixteen patients in the sample went on to proceed with surgery, but most of these found value in having had the physiotherapy first. Discussion Many patients with sciatica appreciate the value of physiotherapy prior to surgery. Future research should examine patients' experiences of bespoke physiotherapy delivered within primary care. Copyright © 2016 The Authors Physiotherapy Research International published by John Wiley & Sons Ltd. PMID:26914525

  18. Usefulness of an accelerated transoesophageal stress echocardiography in the preoperative evaluation of high risk severely obese subjects awaiting bariatric surgery

    Directory of Open Access Journals (Sweden)

    Tessier Michel

    2010-07-01

    Full Text Available Abstract Background Severe obesity is associated with an increased risk of coronary artery disease (CAD. Bariatric surgery is an effective procedure for long term weight management as well as reduction of comorbidities. Preoperative evaluation of cardiac operative risk may often be necessary but unfortunately standard imaging techniques are often suboptimal in these subjects. The purpose of this study was to demonstrate the feasibility, safety and utility of transesophageal dobutamine stress echocardiography (TE-DSE using an adapted accelerated dobutamine infusion protocol in severely obese subjects with comorbidities being evaluated for bariatric surgery for assessing the presence of myocardial ischemia. Methods Subjects with severe obesity [body mass index (BMI >40 kg/m2] with known or suspected CAD and being evaluated for bariatric surgery were recruited. Results Twenty subjects (9M/11F, aged 50 ± 8 years (mean ± SD, weighing 141 ± 21 kg and with a BMI of 50 ± 5 kg/m2 were enrolled in the study and underwent a TE-DSE. The accelerated dobutamine infusion protocol used was well tolerated. Eighteen (90% subjects reached their target heart rate with a mean intubation time of 13 ± 4 minutes. Mean dobutamine dose was 31.5 ± 9.9 ug/kg/min while mean atropine dose was 0.5 ± 0.3 mg. TE-DSE was well tolerated by all subjects without complications including no significant arrhythmia, hypotension or reduction in blood arterial saturation. Two subjects had abnormal TE-DSE suggestive of myocardial ischemia. All patients underwent bariatric surgery with no documented cardiovascular complications. Conclusions TE-DSE using an accelerated infusion protocol is a safe and well tolerated imaging technique for the evaluation of suspected myocardial ischemia and cardiac operative risk in severely obese patients awaiting bariatric surgery. Moreover, the absence of myocardial ischemia on TE-DSE correlates well with a low operative risk of cardiac event.

  19. Elements of power plant design for inertial fusion energy. Final report of a coordinated research project 2000-2004

    International Nuclear Information System (INIS)

    2005-06-01

    There are two major approaches in fusion energy research: magnetic fusion energy (MFE) and inertial fusion energy (IFE). The basic physics of IFE (compression and ignition of small fuel pellets containing deuterium and tritium) is being increasingly understood. Based on recent advances by individual countries, IFE has reached a stage at which benefits could be obtained from a coordinated approach in the form of an IAEA Coordinated Research Project (CRP) on Elements of Power Plant Design for Inertial Fusion Energy. This CRP helped Member States to promote the development of plasma/fusion technology transfer and to emphasize safety and environmental advantages of fusion energy. The CRP was focused on interface issues including those related to, - the driver/target interface (e.g. focusing and beam uniformity required by the target), - the driver/chamber interface (e.g. final optics and magnets protection and shielding), - and the target/chamber interface (e.g. target survival during injection, target positioning and tracking in the chamber). The final report includes an assessment of the state of the art of the technologies required for an IFE power plant (drivers, chambers, targets) and systems integration as presented and evaluated by members of the CRP. Additional contributions by cost free invited experts to the final RCM are included. The overall objective of this CRP was to foster the inertial fusion energy development by improving international cooperation. The variety of contributions compiled in this TECDOC reflects, that the goal of stimulating the exchange of knowledge was well achieved. Further the CRP led to the creation of a network, which not only exchanged their scientific results, but also developed healthy professional relations and strong mutual interest in the work of the group members

  20. The importance of Probabilistic Safety Assessment in the careful study of risks involved to new nuclear power plant projects

    International Nuclear Information System (INIS)

    Mata, Jônatas F.C. da; Mesquita, Amir Z.

    2017-01-01

    The Fukushima Daiichi nuclear accident in Japan in 2011 has raised public fears about the actual safety of nuclear power plants in several countries. The response to this concern by government agencies and private companies has been objective and pragmatic in order to guarantee best practices in the design, construction, operation and decommissioning phases of nuclear reactors. In countries where the nucleo-electric matrix is consolidated, such as the United States, France and the United Kingdom, the safety assessment is carried out considering deterministic and probabilistic criteria. In the licensing stages of new projects, it is necessary to analyze and simulate the behavior of the nuclear power plant, when subjected to conditions that can lead to sequences of accidents. Each initiator event is studied and simulated through computational models, which allow the description and estimation of possible physical phenomena occurring in nuclear reactors. Probabilistic Safety Assessment (PSA) is fundamental in this process, as it studies in depth the sequences of events that can lead to the fusion of the nucleus of the nuclear reactor. Such sequences should be quantified in terms of probability of occurrence and your possible consequences, and organized through techniques such as Fault Tree Analysis and Event Tree Analysis. For these simulations, specialized computer codes for each type of phenomenon should be used, as well as databases based on experience gained in the operation of similar nuclear reactors. The present work will describe, in an objective way, the procedures for the realization of PSA and its applicability to the assurance of the operational reliability of the nuclear reactors, as well as a brief comparative between the approaches used in some countries traditionally users of thermonuclear energy and Brazil. By means of this analysis, it can be concluded that nuclear power is increasingly reliable and safe, being able to provide the necessary

  1. The importance of Probabilistic Safety Assessment in the careful study of risks involved to new nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jônatas F.C. da, E-mail: jonatasfmata@yahoo.com.br [Universidade do Estado de Minas Gerais (UEMG), João Monlevade, MG (Brazil); Mesquita, Amir Z., E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2017-07-01

    The Fukushima Daiichi nuclear accident in Japan in 2011 has raised public fears about the actual safety of nuclear power plants in several countries. The response to this concern by government agencies and private companies has been objective and pragmatic in order to guarantee best practices in the design, construction, operation and decommissioning phases of nuclear reactors. In countries where the nucleo-electric matrix is consolidated, such as the United States, France and the United Kingdom, the safety assessment is carried out considering deterministic and probabilistic criteria. In the licensing stages of new projects, it is necessary to analyze and simulate the behavior of the nuclear power plant, when subjected to conditions that can lead to sequences of accidents. Each initiator event is studied and simulated through computational models, which allow the description and estimation of possible physical phenomena occurring in nuclear reactors. Probabilistic Safety Assessment (PSA) is fundamental in this process, as it studies in depth the sequences of events that can lead to the fusion of the nucleus of the nuclear reactor. Such sequences should be quantified in terms of probability of occurrence and your possible consequences, and organized through techniques such as Fault Tree Analysis and Event Tree Analysis. For these simulations, specialized computer codes for each type of phenomenon should be used, as well as databases based on experience gained in the operation of similar nuclear reactors. The present work will describe, in an objective way, the procedures for the realization of PSA and its applicability to the assurance of the operational reliability of the nuclear reactors, as well as a brief comparative between the approaches used in some countries traditionally users of thermonuclear energy and Brazil. By means of this analysis, it can be concluded that nuclear power is increasingly reliable and safe, being able to provide the necessary

  2. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2012-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  3. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [Department of Energy, Office of River Protection, Richland, Washington (United States); Kacich, Richard M. [Bechtel National, Inc., Richland, WA (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Richland, WA (United States)

    2012-12-20

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  4. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  5. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [U.S. Department of Energy, Office of River Protection, Post Office Box 550, Richland, Washington 99352 (United States); Kacich, Richard M. [Bechtel National, Inc., 2435 Stevens Center Place, Richland, Washington 99354 (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Post Office Box 850, Richland, Washington 99352 (United States)

    2013-07-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines

  6. Application of Phase Shifting Projection Moire on Solid Regular Figures and Plant Organs Three Dimensional Digital Model Generation

    Science.gov (United States)

    Lino, A. C. L.; Dal Fabbro, I. M.

    2008-04-01

    The conception of a tridimensional digital model of solid figures and plant organs started from topographic survey of virtual surfaces [1], followed by topographic survey of solid figures [2], fruit surface survey [3] and finally the generation of a 3D digital model [4] as presented by [1]. In this research work, i.e. step number [4] tested objects included cylinders, cubes, spheres and fruits. A Ronchi grid named G1 was generated in a PC, from which other grids referred as G2, G3, and G4 were set out of phase by 1/4, 1/2 and 3/4 of period from G1. Grid G1 was then projected onto the samples surface. Projected grid was named Gd. The difference between Gd and G1 followed by filtration generated de moiré fringes M1 and so on, obtaining the fringes M2, M3 and M4 from Gd. Fringes are out of phase one from each other by 1/4 of period, which were processed by the Rising Sun Moiré software to produce packed phase and further on, the unpacked fringes. Tested object was placed on a goniometer and rotate to generate four surfaces topography. These four surveyed surfaces were assembled by means of a SCILAB software, obtaining a three column matrix, corresponding to the object coordinates xi, also having elevation values and coordinates corrected as well. The work includes conclusions on the reliability of the proposed method as well as the setup simplicity and of low cost.

  7. Summary of experience from a large number of construction inspections; Wind power plant projects; Erfarenhetsaaterfoering fraan entreprenadbesiktningar

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Bertil; Holmberg, Rikard

    2010-08-15

    This report presents a summary of experience from a large number of construction inspections of wind power projects. The working method is based on the collection of construction experience in form of questionnaires. The questionnaires were supplemented by a number of in-depth interviews to understand more in detail what is perceived to be a problem and if there were suggestions for improvements. The results in this report is based on inspection protocols from 174 wind turbines, which corresponds to about one-third of the power plants built in the time period. In total the questionnaires included 4683 inspection remarks as well as about one hundred free text comments. 52 of the 174 inspected power stations were rejected, corresponding to 30%. It has not been possible to identify any over represented type of remark as a main cause of rejection, but the rejection is usually based on a total number of remarks that is too large. The average number of remarks for a power plant is 27. Most power stations have between 20 and 35 remarks. The most common remarks concern shortcomings in marking and documentation. These are easily adjusted, and may be regarded as less serious. There are, however, a number of remarks which are recurrent and quite serious, mainly regarding gearbox, education and lightning protection. Usually these are also easily adjusted, but the consequences if not corrected can be very large. The consequences may be either shortened life of expensive components, e.g. oil problems in gear boxes, or increased probability of serious accidents, e.g. maladjusted lightning protection. In the report, comparison between power stations with various construction period, size, supplier, geography and topography is also presented. The general conclusion is that the differences are small. The results of the evaluation of questionnaires correspond well with the result of the in-depth interviews with clients. The problem that clients agreed upon as the greatest is the lack

  8. Chest radiographic findings and complications of the temporary implantation of the Jarvik-7 artificial heart while awaiting orthotopic heart transplantation: Experience with five cases

    International Nuclear Information System (INIS)

    Sadler, L.R.; Fuhrman, C.R.; Hardesty, R.A.; Griffith, B.P.

    1986-01-01

    The Jarvik-7 artificial heart was originally introduced as a therapeutic alternative to cardiac transplantation in patients with endstage refractory cardiac disease. Its use has been expanded to those patients awaiting cardiac transplantation in whom death is impending and for whom a suitable donor match is unavailable. At Presbyterian-University Hospital of Pittsburgh five patients have had Jarvik-7 hearts implanted as a temporary measure while awaiting compatible donors for cardiac transplantation. The authors believe this is the largest patient group to undergo this procedure at a single institution. They present a brief description of the Jarvik-7 heart, the clinical factors affecting patient selection, and the radiographic appearance of a normally functioning Jarvik-7 heart, and review the chest radiographic complications seen in the patient group, along with eventual patient outcome

  9. A study of toxic emissions from a coal-fired power plant utilizing an ESP while demonstrating the ICCT CT-121 FGD Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-16

    The US Department of Energy is performing comprehensive assessments of toxic emissions from eight selected coal-fired electric utility units. This program responds to the Clean Air Act Amendments of 1990, which require the US Environmental Protection Agency (EPA) to evaluate emissions of hazardous air pollutants (HAPs) from electric utility power plants for Potential health risks. The resulting data will be furnished to EPA utility power plants and health risk determinations. The assessment of emissions involves the collection and analysis of samples from the major input, process, and output streams of each of the eight power plants for selected hazardous Pollutants identified in Title III of the Clean Air Act. Additional goals are to determine the removal efficiencies of pollution control subsystems for these selected pollutants and the Concentrations associated with the particulate fraction of the flue gas stream as a function of particle size. Material balances are being performed for selected pollutants around the entire power plant and several subsystems to identify the fate of hazardous substances in each utility system. Radian Corporation was selected to perform a toxics assessment at a plant demonstrating an Innovative Clean Coal Technology (ICCT) Project. The site selected is Plant Yates Unit No. 1 of Georgia Power Company, which includes a Chiyoda Thoroughbred-121 demonstration project.

  10. Chest radiographic findings and complications of the temporary implantation of the Jarvik-7 artificial heart while patients await orthotopic heart transplantation

    International Nuclear Information System (INIS)

    Sadler, L.; Fuhrman, C.; Hardesty, R.; Griffith, B.

    1987-01-01

    At the University of Pittsburgh, the authors have had 15 patients in whom Jarvik-7 hearts were implanted as a temporary measure while the patients awaited suitable donors for cardiac transplantation. The paper presents a brief description of the Jarvik-7 artificial heart, factors affecting patient selection, and the radiographic appearance of a normally functioning Jarvik-7 heart, and reviews the chest radiographic complications seen in this patient group, along with eventual patient outcome

  11. Development of Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Kouklik, I.

    2000-01-01

    The presentation evaluates the present situation of the Dukovany nuclear power plant operation. It analyses the present at the plant, and also in both the near and distant localities. Based on these analyses the conclusions and targets that are necessary for keeping the plant's safe operation are made. From the current situation the report about the results of the year 1999 in the operation and financial field, stress on the safety index, is presented. Further, there is a list of finished and semi-finished activities that are taking place within the harmonization of the Dukovany NPP. At the same time the report presents the terms of licensing and the going of implementation of the 'KAPA' project - the complex application of the Atomic Energy Act. In the part, comparison to the environment, there is an example of a comparison with the results of a plant in the EU. Further the report compares the advantages and disadvantages of the WWER reactors with other light water reactors. In the last part of the presentation there is a brief opinion of the author on the steps that are awaiting us in the future. First, the 'Harmonization program' of Dukovany NPP is explained, its philosophy and principles. The basic idea is to take the right steps and strategic decisions, with the vision for the operation till the year 2025 at least. There is also a list of the most important events that are planned to increase the safety. Further the report goes briefly over the current situation in the filed of nuclear energy in the period of joining the European Union and also mentions the risks that result from this process. It concludes with the prognosis for the further position of the Dukovany nuclear power plant. (author)

  12. Experiences in the implementation of the Coaching project in the nuclear power plant of Laguna Verde (NPP-L V)

    International Nuclear Information System (INIS)

    Mendez M, H. I.

    2012-10-01

    This document has the purpose of to share acquired experiences during the implementation of the Coaching project focused the training of supervisors and directive personnel of the nuclear power plant of Laguna Verde (NPP-L V). Derived of the improvement areas identified by the supervisor organization of the nuclear power stations WANO (World Association Nuclear of Operators) and of the auto-evaluations realized by the expert personnel of the same power station that based on external experiences carried out through the Benchmarking (comparison with other power stations) they have reflected the necessity to activate a training process in Coaching with a practical focus toward the directive and supervisor personnel in the power station. By means of the observation of the personnel's acting so much in the control rooms like in different areas, three focus areas have been identified for the training in Coaching, these are the personnel's motivation, the organizational communication so much in vertical form as horizontal and the perception of confidence lack among directive, supervisors, operators and technicians. The plan focused in the abilities training of Coaching with practical sense was development, supported with an evaluation of 360 grades as tool of competitions development through a computer application e-Coaching. The use of application and Coaching following techniques facilitated the conformation of the practical focus, same that are of continuous use starting from the training of the supervisor and directive personnel. (Author)

  13. Fiscal 1980 Sunshine Project research report. Development of hydrothermal power plant (Development of binary cycle power plant); 1980 nendo nessui riyo hatsuden plant no kaihatsu seika hokokusho. Binary cycle hatsuden plant no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the fiscal 1980 research result on evaluation of elementary technology studies, research on plant technologies, and assessment of profitability for development of the next 10MW class large binary cycle power plant. In evaluation of heat media and heat cycles, selection of heat media and preparation of specimens through document survey, measurement of thermal characteristics, and preparation of pressure-enthalpy charts were carried out for selection of promising media. In evaluation of materials, as the field corrosion test and simulation results on 3 kinds of welding materials, it was concluded that SUS316 is best as material. In evaluation of heat medium turbine, through the test on oil film seal and mechanical seal techniques, various information were obtained. In evaluation of mist-cooling condenser, experiment on the basic unit heat exchanger, and study on the optimum design were carried out. In addition, research on plant technologies, and assessment of profitability were conducted. (NEDO)

  14. Siphon-based turbine - Demonstration project: hydropower plant at a paper factory in Perlen, Switzerland; Demonstrationsprojekt Saugheber - Turbinen. Wasserturbinenanlage Papierfabrik Perlen (WTA-PF)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) describes the demonstration project that concerned the re-activation and refurbishing of a very low-head hydropower installation. The functional principles of the siphon-turbine used are explained and the potential for its use at many low-head sites examined. The authors are of the opinion that innovative technology and simple mechanical concepts could be used to reactivate out-of-use hydropower plant or be used to refurbish existing plant to provide increased efficiency and reliability. Various other points that are to be considered when planning the refurbishment of a hydropower plant such as retaining mechanical and hydraulic symmetry in the plant are listed and concepts for reducing operating costs are discussed. Figures on the three runner-regulated turbines installed in Perlen are quoted.

  15. Data processing technologies and diagnostics for water chemistry and corrosion control in nuclear power plants (DAWAC). Report of a coordinated research project 2001-2005

    International Nuclear Information System (INIS)

    2006-06-01

    This publication provides information on the current status and development trends in monitoring, diagnostics and control of water chemistry and corrosion of core and primary circuit materials in water cooled power reactors. It summarizes the results of an IAEA Coordinated Research Project and focuses on the methods for development, qualification and implementation of water chemistry expert systems at nuclear power plants. These systems are needed to have full benefit from using on-line sensors in real time mode when sensor signals, and other chemistry and operational data, are collected and continuously analysed with data acquisition and evaluation software. Technical knowledge was acquired in water chemistry control techniques (grab sampling, on-line monitoring, data collecting and processing, etc), plant chemistry and corrosion diagnostics, plant monitoring (corrosion, chemistry, activity) and plant chemistry improvement (analytical models and practices). This publication covers contributions from leading experts in water chemistry/corrosion, representing organizations from 16 countries with the largest nuclear capacities

  16. Novel Natural Products for Healthy Ageing from the Mediterranean Diet and Food Plants of Other Global Sources-The MediHealth Project.

    Science.gov (United States)

    Waltenberger, Birgit; Halabalaki, Maria; Schwaiger, Stefan; Adamopoulos, Nicolas; Allouche, Noureddine; Fiebich, Bernd L; Hermans, Nina; Jansen-Dürr, Pidder; Kesternich, Victor; Pieters, Luc; Schönbichler, Stefan; Skaltsounis, Alexios-Leandros; Tran, Hung; Trougakos, Ioannis P; Viljoen, Alvaro; Wolfender, Jean-Luc; Wolfrum, Christian; Xynos, Nikos; Stuppner, Hermann

    2018-05-06

    There is a rapid increase in the percentage of elderly people in Europe. Consequently, the prevalence of age-related diseases will also significantly increase. Therefore, the main goal of MediHealth, an international research project, is to introduce a novel approach for the discovery of active agents of food plants from the Mediterranean diet and other global sources that promote healthy ageing. To achieve this goal, a series of plants from the Mediterranean diet and food plants from other origins are carefully selected and subjected to in silico, cell-based, in vivo (fly and mouse models), and metabolism analyses. Advanced analytical techniques complement the bio-evaluation process for the efficient isolation and identification of the bioactive plant constituents. Furthermore, pharmacological profiling of bioactive natural products, as well as the identification and synthesis of their metabolites, is carried out. Finally, optimization studies are performed in order to proceed to the development of innovative nutraceuticals, dietary supplements or herbal medicinal products. The project is based on an exchange of researchers between nine universities and four companies from European and non-European countries, exploiting the existing complementary multidisciplinary expertise. Herein, the unique and novel approach of this interdisciplinary project is presented.

  17. Project subsidized by the Sunshine Project in fiscal 1982. Report on achievements in the project commissioned from NEDO - development of a hot water utilizing power generation plant and development of a binary cycle power generation plant (Researches on corrosion preventive measures and the cycle optimum for the plant); 1982 nendo nessui riyo hatsuden plant no kaihatsu seika hokokusho. Binary cycle hatsuden plant no kaihatsu (fushoku taisaku no kenkyu oyobi plant saiteki cycle no kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    As the element research on a 10-MW class geothermal binary cycle power plant to be built in the coming term, researches were made on corrosion preventive measures and the cycle optimum for the plant. This paper reports the achievements in fiscal 1982. In the research on corrosion preventive measures, different kinds of materials were buried in three locations having different soil natures to study corrosion due to soil. The corrosion rate of heat conducting pipes using the heat media R114 was estimated as very small as 1/40 of the corrosion rate in geothermal waters. In the research on the cycle optimum for the plant, experimental research was performed on thermo-dynamic properties and thermal stability of the mixed media using R114 as the main component. As a result, the R114/R112 system was found to have higher pressure than R114, but the media circulation amount is less, and the output at the power transmission terminal increased by 5 to 10%. The system showed the most excellent heat cycle characteristics. In the research of building a power plant installed with two different power generation systems, a computer program was prepared that calculates heat balances all at once for the case of installing a geothermal binary cycle power plant in a geothermal steam power plant. (NEDO)

  18. Results from Project on Enhancement of Aging Management and Maintenance in Nuclear Power Plants - Irradiation Embrittlement of RPV Steels -

    International Nuclear Information System (INIS)

    Abe, Hiroaki; Onizawa, Kunio; Katsuyama, Jinya; Murakami, Kenta; Iwai, Takeo; Iwata, Tadao; Katano, Yoshio; Sekimura, Naoto; Nagai, Yasuyoshi; Toyama, Takeshi; Tamura, Satoshi

    2012-01-01

    As one of the NISA Project on Enhancement of Aging Management and Maintenance in Nuclear Power Plants, we have performed research on the irradiation embrittlement of reactor pressure vessel (RPV) steels, especially focusing on irradiation embrittlement on heat affected zone (HAZ) and on applications of ion beams to deduce fundamental insights irradiation-induced embrittlement. The results obtained from the project are summarized as follows. In order to obtain the technical basis to judge the necessity of surveillance specimens from HAZ, the neutron irradiation program was performed at JRR-3, JAEA. The samples were carefully designed based on the insights from finite element analysis, metallography, 3D atom probe and positron annihilation methods, and were fabricated so as to simulate both heat treatment history and microstructure for typical HAZ from as-fabricated RPV steels which also have variation of impurity levels. The fracture toughness of the unirradiated HAZ specimens was equivalent to or better than that of base metals. Irradiation embrittlement and hardening were roughly identical to those of base metals, while some of the fine-grained HAZ microstructure was susceptible to it. The probabilistic fracture mechanics analysis was applied to the structural integrity assessment taking into account the heterogeneous microstructure as well as susceptibility for irradiation embrittlement of each HAZ microstructure under the variation of welding parameter and PTS condition. It was shown that crack propagation at the fine-grained HAZ, but the discontinuous distribution of the microstructure retards the further propagation. For the precise correlation of irradiation embrittlement of RPV steels for the long term operations, accumulations of high-dose data are required. Ion beam irradiation is one of the solutions for the regime and for mechanism-based descriptions. Another interest of ours was to describe irradiation hardening and embrittlement in terms of

  19. Synthesis of results obtained on sodium components and technology through the Generation IV International Forum SFR Component Design and Balance-of-Plant Project

    International Nuclear Information System (INIS)

    Sienicki, J.J.; Rodriguez, G.; Kisohara, N.; Kim, J. B.; Gerber, A.; Ashurko, Y.; Toyama, S.

    2013-01-01

    Status: The viability of designing SFR components and BOP has been demonstrated with design, construction and operation of previous sodium-cooled reactors. The main objective of this R&D project is related to system performance, or by development on the use of AECS in the BOP that could allow further cost improvements. Objective: To conduct collaborative research and development of components and BOP for the SFR System. The Project has to satisfy the GIF’s criteria of safety, economy, sustainability, proliferation resistance and physical protection. Activities within this Project are addressing experimental and analytical evaluation of advanced ISI&R, LBB assessment, development of AECS with Brayton cycles, advanced SG technologies. Project activities will be based in part on the extensive historical R&D experience with component design and balance of plant for sodium-cooled fast reactors

  20. Environmental regulation of plant gene expression: an RT-qPCR laboratory project for an upper-level undergraduate biochemistry or molecular biology course.

    Science.gov (United States)

    Eickelberg, Garrett J; Fisher, Alison J

    2013-01-01

    We present a novel laboratory project employing "real-time" RT-qPCR to measure the effect of environment on the expression of the FLOWERING LOCUS C gene, a key regulator of floral timing in Arabidopsis thaliana plants. The project requires four 3-hr laboratory sessions and is aimed at upper-level undergraduate students in biochemistry or molecular biology courses. The project provides students with hands-on experience with RT-qPCR, the current "gold standard" for gene expression analysis, including detailed data analysis using the common 2-ΔΔCT method. Moreover, it provides a convenient starting point for many inquiry-driven projects addressing diverse questions concerning ecological biochemistry, naturally occurring genetic variation, developmental biology, and the regulation of gene expression in nature. Copyright © 2013 Wiley Periodicals, Inc.

  1. Comparative analysis of structural concrete Quality Assurance practices on nine nuclear and three fossil fuel power plant construction projects. Final summary report

    International Nuclear Information System (INIS)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.J. Jr.

    1978-12-01

    A summary of two reports, COO/4120-1 and COO/4120-2, is given. A comparative analysis was made of the Quality Assurance practices related to the structural concrete phase on nine nuclear and three fossil fuel power plant projects which are (or have been) under construction in the United States in the past ten years. For the nuclear projects the analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. For the fossil projects the analysis identified the response of each Quality Assurance program to criteria similar to those which were applicable in the nuclear situation. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects

  2. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    Energy Technology Data Exchange (ETDEWEB)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  3. Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant's QA programs that are necessary for this project

  4. Research projects into the safety of nuclear power plants. Period covered: 01. July - 31. December 2004. Progress report

    International Nuclear Information System (INIS)

    2004-01-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technology (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system 'Joint Safety Research Index' of the CEC (Commission of the European Communities). The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  5. An electron beam flue gas treatment plant for a coal fired thermal power station. EBA demonstration plant in Chengdu thermal power station (China EBA Project)

    International Nuclear Information System (INIS)

    Doi, Yoshitaka; Nakanishi, Ikuo; Shi, Jingke

    1999-01-01

    Ebara's electron beam flue gas treatment plant was installed and is being demonstrated in Chengdu Thermal Power Station, Sichuan, China. The demonstration is proving that this plant is fully capable of meeting the target removal of sulfur dioxides from flue gas (flow rate : 300-thousand m 3 /h). Recovered by-products, namely ammonium sulfate and ammonium nitrate, from the treatment were actually tested as fertilizers, the result of which was favorable. The sale and distribution of these by-products are already underway. In May 1995, this plant was presented the certificate of authorization by China's State Power Corporation. It is noted that this was the first time a sulfur dioxide removal plant was certified as such in China. (author)

  6. Mitigation of socio-economic impacts due to the construction of energy projects in rural communities: an evaluation of the Hartsville nuclear power plant transportation-mitigation program

    International Nuclear Information System (INIS)

    Whitney, T.C.

    1982-01-01

    This study analyzes the effects of a commuter ride-sharing program in mitigating the harmful socio-economic impacts of a short-term, labor-intensive nuclear-power-plant construction project. The major hypothesis is that transportation-mitigation programs are more cost-effective in reducing the undesirable socio-economic impacts of large-scale construction projects than programs designed to mitigate impacts through the provision of public services for migrating workers. The dissertation begins by delineating the socio-economic effects of large-scale construction projects in rural areas. It proceeds to show how some of the deleterious impacts were mitigated using a commuter ride-sharing program. After the range of potential socio-economic impacts was established, a framework was developed to evaluate the effects of the transportation-mitigation program in mediating the harmful impacts. The framework involved the integration of the cost-benefit technique with social-impact assessment. The evaluation was grounded in a comparative framework whereby the Hartsville project community was compared with a similar community undergoing the construction of a nuclear power plant but without a commuter ride-sharing program, and a community not experiencing a major construction project. The research findings indicated that the transportation-mitigation program substantially reduced the in-migration of construction workers into the Hartsville-Trousdale County area. Further, the program was cost effective, with a benefit-cost ratio of 2.5 and net benefits totalling 28 million dollars

  7. New power plants in Europe. A challenge for project and quality management; Kraftwerksneubau in Europa. Eine Herausforderung fuer Projekt- und Qualitaetsmanagement

    Energy Technology Data Exchange (ETDEWEB)

    Hartung, Matthias [RWE Technology GmbH, Essen (Germany)

    2011-07-01

    The challenges faced by power plant engineering in Europe have become more versatile and - above all - more complex. RWE has created the preconditions for setting up a uniform European negotiating basis for dealing with contracting parties, suppliers, building contractors and service providers. In addition, merging employees from our core markets is efficiently promoting the technology and best-practice transfer within the group. In this context, the harmonisation of standards and pooling of project management as well as engineering skills for the implementation of complex investment projects at international level are of decisive importance. (orig.)

  8. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS, Volume 1 of 2

    International Nuclear Information System (INIS)

    1994-01-01

    The primary focus of this environmental analysis is on improvements to the Southeast Regional Wastewater Treatment Plant (SRWTP) facilities and disposal to the Geysers for injection. This analysis will be incorporated with an earlier EIR which evaluated system improvements to the SRWTP and twelve disposal alternatives. In July 1993, the Lake County Sanitation District Board of Directors (LACOSAN) selected the Geysers Effluent Pipeline as the preferred alternative to be analyzed in this EIR/EIS. This environmental analysis will primarily focus on improvements to the SRWTP facilities and a 24 inch pipeline designed to carry up to 5,400 gallons per minute of secondarily treated wastewater. The wastewater will be transported from the Lake County Sanitation District's Southeast Regional Wastewater Treatment Plant, Middletown Wastewater Treatment Plant with additional make-up water from Clear Lake to the Southeast portion of the Geysers Geothermal Field in Lake and Sonoma Counties, California

  9. Small-scale hydro-power plant in Quinto - Preliminary project; Progetto minicentrale idroelettrica, Ri Secco - Quinto. Programma piccole centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-06-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the alpine stream 'Ri Secco' in the municipality of Quinto, southern Switzerland. The Ri Secco partly flows in a steep canyon. The elevation difference of 810 or 620 m (depending on the location of the water deviation from the stream) is favorable to the installation of a small-scale high-head power plant. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include two possible penstock diameters for each weir location. The electricity production expected is discussed, as is the economic viability of the project.

  10. Solving some socio-economic relations in the area of the projected site of the Blahutovice nuclear power plant

    International Nuclear Information System (INIS)

    Uvirova, E.; Grosikova, B.

    1988-01-01

    Blahutovice nuclear power plant personnel will be accommodated in hostels and newly built appartments in Novy Jicin and in Hranice. Commuting of personnel to the plant from the two towns is discussed. A works health centre will be built in the nuclear power plant area delivering primary health care. A radiation medicine unit is also envisaged. The Beskydy Mts. in Northern Moravia are considered for recreation-rehabilitation facilities. (E.S.). 2 tabs., 5 refs

  11. Environmental summary document for the Republic Geothermal, Inc. application for a geothermal loan guaranty project: 64 MW well field and 48 MW (net) geothermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Layton, D.W.; Powers, D.J.; Leitner, P.; Crow, N.B.; Gudiksen, P.H.; Ricker, Y.E.

    1979-07-01

    A comprehensive review and analysis is provided of the environmental consequences of (1) guaranteeing a load for the completion of the 64 MW well field and the 48 MW (net) power plant or (2) denying a guaranteed load that is needed to finish the project. Mitigation measures are discussed. Alternatives and their impacts are compared and some discussion is included on unavoidable adverse impacts. (MHR)

  12. The End of the Line, Preparing the Main Plant Process Building for Demolition at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Rowell, L.E.; Kurasch, D.H.; Hackett, M.; Gorsuch, G.; Sullivan, D.W.

    2009-01-01

    The West Valley Demonstration Project (WVDP) Act of 1980 authorized the Department of Energy to conduct a high-level radioactive waste management demonstration project at the site of the former Spent Fuel Reprocessing Plant in West Valley, New York to demonstrate solidification techniques to prepare high-level liquid waste for disposal. The reprocessing facility at this site was the only commercial NRC-licensed spent fuel reprocessing plant to have operated in the United States. The spent fuel reprocessing operations ended in 1972 and DoE's cleanup operations have been underway since 1982. High-level waste solidification was safely concluded in 2002 and follow-on activities at the site have been concentrated on facility decontamination and waste management and off-site disposal. Among the features that remain at the WVDP site is the highly-contaminated Main Plant Process Building (MPPB). The five-story reinforced concrete structure, which was formerly used to reprocess irradiated nuclear fuel, contains residual levels of contamination in some areas that prohibit safe human entry. DoE's long-range plans for the site include demolition of the MPPB. Current site contractor, West Valley Environmental Services LLC (WVES), while actively working to dismantle equipment and decontaminate areas inside the MPPB, has developed a conceptual two-phase plan for demolishing the structure that provides a cost-effective, lower-dose alternative to conventional demolition techniques. This paper discusses the current condition of the MPPB and the demolition-ready preparations conducted in the facility thus far. This paper also introduces the concept of a two-part surgical demolition plan that has been proposed and is being evaluated as a safe method of demolishing the structure. The practical applications that support feasibility for the demolition approach are being demonstrated through current work applications in the MPPB. The Inside-Out Demolition proposal for the MPPB is a safe

  13. Implementation of the project of equipment reliability in the nuclear power plant of Laguna Verde; Implementacion del proyecto de confiabilidad de equipo en la Central Nucleoelectrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rios O, J. E.; Martinez L, A. G. [CFE, Central Laguna Verde, Subgerencia General de Operacion, Veracruz (Mexico)]. e-mail: jrios@cfe.gob.mx

    2008-07-01

    A equipment is reliable if it fulfills the function for which was designed and when it is required. To implement a project of reliability in a nuclear power plant this associate to a process of continuous analysis of the operation, of the conditions and faults of the equipment. The analysis of the operation of a system, of the equipment of the same faults and the parts that integrate to equipment take to identify the potential causes of faults. The predictive analysis on components and equipment allow to rectify and to establish guides to optimize the maintenance and to guarantee the reliability and function of the same ones. The reliability in the equipment is without place to doubts a wide project that embraces from the more small component of the equipment going by the proof of the parts of reserve, the operation conditions until the operative techniques of analysis. Without place of doubt for a nuclear power plant the taking of decisions based on the reliability of their systems and equipment will be the appropriate for to assure the operation and reliability of the same one. In this work would appear the project of reliability its processes, criteria, indicators action of improvement and the interaction of the different disciplines from the Nuclear Power Plant of Laguna Verde like a fundamental point for it put in operation. (Author)

  14. The projected effect on insects, vertebrates, and plants of limiting global warming to 1.5°C rather than 2°C.

    Science.gov (United States)

    Warren, R; Price, J; Graham, E; Forstenhaeusler, N; VanDerWal, J

    2018-05-18

    In the Paris Agreement on Climate Change, the United Nations is pursuing efforts to limit global warming to 1.5°C, whereas earlier aspirations focused on a 2°C limit. With current pledges, corresponding to ~3.2°C warming, climatically determined geographic range losses of >50% are projected in ~49% of insects, 44% of plants, and 26% of vertebrates. At 2°C, this falls to 18% of insects, 16% of plants, and 8% of vertebrates and at 1.5°C, to 6% of insects, 8% of plants, and 4% of vertebrates. When warming is limited to 1.5°C as compared with 2°C, numbers of species projected to lose >50% of their range are reduced by ~66% in insects and by ~50% in plants and vertebrates. Copyright © 2018 The Authors, some rights reserved; exclusive licensee American Association for the Advancement of Science. No claim to original U.S. Government Works.

  15. Improving collaborative work and project management in a nuclear power plant design team: A human-centered design approach

    International Nuclear Information System (INIS)

    Boy, Guy André; Jani, Gopal; Manera, Annalisa; Memmott, Matthew; Petrovic, Bojan; Rayad, Yassine; Stephane, Lucas; Suri, Neha

    2016-01-01

    This article presents a collaborative system, called SCORE, useful for a multi-disciplinary team designing a new nuclear power plant (NPP). It was developed during the first phase of the I 2 S-LWR project (Integral Inherently Safe Light Water Reactor). SCORE enables the generation of design cards (DCs). A DC includes four main spaces (Boy, 2005): (1) a rationalization space where the various components of the system being designed (SBD) are described in terms of design rationale, integration and requirements; this space includes declarative and procedural descriptions and statements; (2) an activity space where the current version of the SBD is displayed; it includes static and dynamic features; this space enables SBD manipulation; (3) a structure space where the various components and their inter-relations are formally and declaratively described as systems of systems; (4) a function space where the various functions of the SBD are described in terms of procedural knowledge and dynamic processes involved; this space includes qualitative and quantitative physical and cognitive models. The rationalization space is informed using an adapted version of the QOC method (Questions, Options, Criteria), which was tested within the I 2 S-LWR design team. The activity space contains 3D models developed using AutoDesk Inventor, and transferred into the Unity game engine web player in order to facilitate integration within the DC spaces and enable intuitive manipulation of objects in the activity space. Two additional spaces were added: an instant messaging capability that allows design team members (DTMs) to exchange with one another on a DC; and a structured evaluation space. DCs are cooperatively created and refined by DTMs, and synthesized during periodic design meetings, the frequency of which may vary. Incrementally combining abstract explanations of designed elements and integration with their explicit visual representation improves mutual understanding among DTMs, and

  16. 75 FR 69711 - STP Nuclear Operating Company, South Texas Project Nuclear Power Plant, Units 3 and 4; Exemption

    Science.gov (United States)

    2010-11-15

    ... groundwater pathways. However, NRC staff expects that the CFRWs will create a longer pathway and travel time... CFRWs, as excavation for permanent plant structures proceeds. As construction of the permanent plant... licensing process, so that it can begin construction promptly upon issuance of COLs. 3.0 Discussion Pursuant...

  17. Effects of Nitrogen and Phosphorus Fertilizer and Topsoil Amendment on Native Plant Cover in Roadside Revegetation Projects.

    Science.gov (United States)

    Hillhouse, Heidi L; Schacht, Walter H; Soper, Jonathan M; Wienhold, Carol E

    2018-01-01

    Establishing vegetation on roadsides following construction can be challenging, especially for relatively slow growing native species. Topsoil is generally removed during construction, and the surface soil following construction ("cut-slope soils") is often compacted and low in nutrients, providing poor growing conditions for vegetation. Nebraska Department of Transportation (NDOT) protocols have historically called for nitrogen (N) and phosphorus (P) fertilization when planting roadside vegetation following construction, but these recommendations were developed for cool-season grass plantings and most current plantings use slower-establishing, native warm-season grasses that may benefit less than expected from current planting protocols. We evaluated the effects of nitrogen and phosphorus fertilization, and also topsoil amendment, on the foliar cover of seeded and non-seeded species planted into two post-construction roadside sites in eastern Nebraska. We also examined soil movement to determine how planting protocols and plant growth may affect erosion potential. Three years after planting, we found no consistent effects of N or P fertilization on foliar cover. Plots receiving topsoil amendment had 14% greater cover of warm-season grasses, 10% greater total foliar cover, and 4-13% lower bare ground (depending on site) than plots without topsoil. None of the treatments consistently affected soil movement. We recommend that NDOT change their protocols to remove N and P fertilization and focus on stockpiling and spreading topsoil following construction.

  18. Effects of Nitrogen and Phosphorus Fertilizer and Topsoil Amendment on Native Plant Cover in Roadside Revegetation Projects

    Science.gov (United States)

    Hillhouse, Heidi L.; Schacht, Walter H.; Soper, Jonathan M.; Wienhold, Carol E.

    2018-01-01

    Establishing vegetation on roadsides following construction can be challenging, especially for relatively slow growing native species. Topsoil is generally removed during construction, and the surface soil following construction ("cut-slope soils") is often compacted and low in nutrients, providing poor growing conditions for vegetation. Nebraska Department of Transportation (NDOT) protocols have historically called for nitrogen (N) and phosphorus (P) fertilization when planting roadside vegetation following construction, but these recommendations were developed for cool-season grass plantings and most current plantings use slower-establishing, native warm-season grasses that may benefit less than expected from current planting protocols. We evaluated the effects of nitrogen and phosphorus fertilization, and also topsoil amendment, on the foliar cover of seeded and non-seeded species planted into two post-construction roadside sites in eastern Nebraska. We also examined soil movement to determine how planting protocols and plant growth may affect erosion potential. Three years after planting, we found no consistent effects of N or P fertilization on foliar cover. Plots receiving topsoil amendment had 14% greater cover of warm-season grasses, 10% greater total foliar cover, and 4-13% lower bare ground (depending on site) than plots without topsoil. None of the treatments consistently affected soil movement. We recommend that NDOT change their protocols to remove N and P fertilization and focus on stockpiling and spreading topsoil following construction.

  19. Pediatric surgeons and anesthesiologists expand the dialogue on the neurotoxicity question, rationale for early and delayed surgeries, and practice changes while awaiting definitive evidence.

    Science.gov (United States)

    Byrne, Mary W; Casale, Pasquale; Garzon, Maria; Hyman, Joshua E; Lin, Albert Y; Lynch, Lisa R; Schleien, Charles L; Stylianos, Steven

    2014-10-01

    The Pediatric Anesthesia NeuroDevelopment Assessment team at Columbia University Medical Center Department of Anesthesiology convened its fourth biennial Symposium to address unresolved issues concerning potential neurotoxic effects of anesthetic agents and sedatives on young children and to assess study findings to date. Dialogue initiated at the third Symposium was continued between anesthesiologists, researchers, and a panel of expert pediatric surgeons representing general surgery and dermatology, orthopedic, and urology specialties. The panel explored the need to balance benefits of early surgery using improved technologies against potential anesthetic risks, practice changes while awaiting definitive answers, and importance of continued interprofessional dialogue.

  20. Expert report of ENSI on the request of EKKB AG for a general license - Project 'New nuclear power plant to replace the Beznau plant'; Gutachten des ENSI zum Rahmenbewilligungsgesuch der EKKB AG. Neubauprojekt Ersatzkernkraftwerk Beznau

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-09-15

    can be correctly taken into account through robust design of the buildings. From the very beginning EKKB will set up a team sufficient to operate the power plant safely. The power plant protection against sabotage, violent actions or embezzlement is based on well designed safeguards regarding building, technical, organisational and administrative measures. The volume of radioactive wastes which are produced during the operation of the power plant is evaluated; it is compatible with the project for the disposal of all radioactive wastes as accepted by the Swiss Federal Council. At the end of its operation period, the power plant can be entirely dismantled and the radioactive parts safely stored