  1. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  2. Integrated Nuclear Recycle Plant

    International Nuclear Information System (INIS)

    Patodi, Anuj; Parashar, Abhishek; Samadhiya, Akshay K.; Ray, Saheli; Dey, Mitun; Singh, K.K.

    2017-01-01

    Nuclear Recycle Board (NRB), Tarapur proposes to set up an 'Integrated Nuclear Recycle Plant' at Tarapur. This will be located in the premises of BARC facilities. The project location is at coastal town of Tarapur, 130 Km north of Mumbai. Project area cover of INRP is around 80 hectares. The plant will be designed to process spent fuel received from Pressurized Heavy Water Reactors (PHWRs). This is the first large scale integrated plant of the country. INRP will process spent fuel obtained from indigenous nuclear power plants and perform left over nuclear waste disposal

  3. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  4. Tight integration of computerized procedures with plant information at the South Texas Project

    International Nuclear Information System (INIS)

    Brtis, J.S.; Green, T.

    1996-01-01

    This paper describes a unique undertaking that is underway at Houston Lighting and Power's South Texas Project (STP). The paper presents an information upgrade project that uses expert system technologies to computerize design change procedures and to tightly integrate the resulting on-line, interactive procedures with the on-line information that design change activities use and generate. This effort will show how procedure computerization can leverage the large investments in plant data. The expected benefits include reduced costs and improved quality of design change work, plus a significant reduction in the burden of configuration management that comes from design changes. Both process computerization and the integration of process with data are being implemented at STP. This work is part of a major migration of information from a mainframe to a LAN platform. This paper will be of greatest interest to those involved in: (1) configuration management, (2) coordinating information to support design change procedures, (3) plant information management, and (4) business process reengineering

  5. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  6. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  7. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  8. Plant life management in Belgium: an integrated project

    International Nuclear Information System (INIS)

    Wacquier, W.; Smet, M. de; Hennart, J.C.; Greer, J.L.; Breesch, Ch.; Havard, P.

    2001-01-01

    In Belgium, a specific plant life management project, named ''Continuous Operation of Belgian NPPs'' is currently developing. Its final objective is to centralize all safety and economic aspects of plant life management in order to determine, for each NPP unit, the optimal actions required to maintain their safe and reliable operation. As the lifetime of safety-related active components is permanently controlled by the current maintenance programs, the project focuses only on passive safety-related components and on non-safety components important for the availability of the plants. These structures and components were evaluated and compared on the basis of a set of weighted criteria in order to measure their criticality and to identify those which must be considered in the project. The selection and the ranking of those components is based on the KBM TM methodology (Knowledge Based Maintenance). This methodology facilitates the collection, formalization and exchange of know-how and gives immediate results thanks to a sequential and systematic step by step analysis. (author)

  9. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  10. CHALLENGES AND OPPORTUNITIES--INTEGRATED LIFE-CYCLE OPTIMIZATION INITIATIVES FOR THE HANFORD RIVER PROTECTION PROJECT--WASTE TREATMENT PLANT

    International Nuclear Information System (INIS)

    Auclair, K. D.

    2002-01-01

    This paper describes the ongoing integrated life-cycle optimization efforts to achieve both design flexibility and design stability for activities associated with the Waste Treatment Plant at Hanford. Design flexibility is required to support the Department of Energy Office of River Protection Balance of Mission objectives, and design stability to meet the Waste Treatment Plant construction and commissioning requirements in order to produce first glass in 2007. The Waste Treatment Plant is a large complex project that is driven by both technology and contractual requirements. It is also part of a larger overall mission, as a component of the River Protection Project, which is driven by programmatic requirements and regulatory, legal, and fiscal constraints. These issues are further complicated by the fact that both of the major contractors involved have a different contract type with DOE, and neither has a contract with the other. This combination of technical and programmatic drivers, constraints, and requirements will continue to provide challenges and opportunities for improvement and optimization. The Bechtel National, Inc. team is under contract to engineer, procure, construct, commission and test the Waste Treatment Plant on or ahead of schedule, at or under cost, and with a throughput capacity equal to or better than specified. The Department of Energy is tasked with the long term mission of waste retrieval, treatment, and disposal. While each mission is a compliment and inextricably linked to one another, they are also at opposite ends of the spectrum, in terms of expectations of one another. These mission requirements, that are seemingly in opposition to one another, pose the single largest challenge and opportunity for optimization: one of balance. While it is recognized that design maturation and optimization are the normal responsibility of any engineering firm responsible for any given project, the aspects of integrating requirements and the management

  11. Integration of distributed plant process computer systems to nuclear power generation facilities

    International Nuclear Information System (INIS)

    Bogard, T.; Finlay, K.

    1996-01-01

    Many operating nuclear power generation facilities are replacing their plant process computer. Such replacement projects are driven by equipment obsolescence issues and associated objectives to improve plant operability, increase plant information access, improve man machine interface characteristics, and reduce operation and maintenance costs. This paper describes a few recently completed and on-going replacement projects with emphasis upon the application integrated distributed plant process computer systems. By presenting a few recent projects, the variations of distributed systems design show how various configurations can address needs for flexibility, open architecture, and integration of technological advancements in instrumentation and control technology. Architectural considerations for optimal integration of the plant process computer and plant process instrumentation ampersand control are evident from variations of design features

  12. PV integration into a CSP plant

    Science.gov (United States)

    Carvajal, Javier López; Barea, Jose M.; Barragan, Jose; Ortega, Carlos

    2017-06-01

    This paper describes a preliminary techno-economic analysis of the integration of a PV plant into an optimized Parabolic Trough Plant in order to reduce the online consumptions and thus, increase the net electricity injected into the grid. The idea is to assess the feasibility of such project and see what configuration would be the optimal. An extra effort has been made in terms of modelling as the analysis has to be done to the integrated CSP + PV plant instead of analyzing them independently. Two different technologies have been considered for the PV plant, fix and one-axis tracking. Additionally three different scenarios have been considered for the CSP plant auxiliary consumptions as they are essential for determining the optimal PV plant (the higher the auxiliary consumption the higher the optimal PV plant). As could be expected, the results for all cases with PV show an improvement in terms of electricity generation and also in terms of LCOE with respect to the CSP plant. Such improvement is slightly higher with tracking technology for this specific study. Although this exercise has been done to an already designed CSP plant (so only the PV plant had to be optimized), the methodology could be applied for the optimization of an integrated CSP + PV plant during the design phase.

  13. The future of integrated coal gasification combined cycle power plants

    International Nuclear Information System (INIS)

    Mueller, R.; Termuehlen, H.

    1991-01-01

    This paper examines the future of integrated coal gasification combined cycle (IGCC) power plants as affected by various technical, economical and environmental trends in power generation. The topics of the paper include a description of natural gas-fired combined cycle power plants, IGCC plants, coal gasifier concepts, integration of gasifiers into combined cycle power plants, efficiency, environmental impacts, co-products of IGCC power plants, economics of IGCC power plants, and a review of IGCC power plant projects

  14. PGSB/MIPS PlantsDB Database Framework for the Integration and Analysis of Plant Genome Data.

    Science.gov (United States)

    Spannagl, Manuel; Nussbaumer, Thomas; Bader, Kai; Gundlach, Heidrun; Mayer, Klaus F X

    2017-01-01

    Plant Genome and Systems Biology (PGSB), formerly Munich Institute for Protein Sequences (MIPS) PlantsDB, is a database framework for the integration and analysis of plant genome data, developed and maintained for more than a decade now. Major components of that framework are genome databases and analysis resources focusing on individual (reference) genomes providing flexible and intuitive access to data. Another main focus is the integration of genomes from both model and crop plants to form a scaffold for comparative genomics, assisted by specialized tools such as the CrowsNest viewer to explore conserved gene order (synteny). Data exchange and integrated search functionality with/over many plant genome databases is provided within the transPLANT project.

  15. The CIDEM project for integrating availability, operating experience and maintenance in the design of future nuclear power plants

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    1998-01-01

    To minimize the kWh cost of future nuclear plants EDF has decided to implement the CIDEM project (French acronym for Design Integrating Availability, Operating Experience and Maintenance), an analytic and systematic process for studying new projects. The first CIDEM application is centered on the future French nuclear unit construction program, known as the REP 2000 Program but the approach could be applied to other Reactor type. The CIDEM studies at the beginning, were oriented to the issues strongly impacting the availability. They have concerned: planned outages, forced outages and preventive maintenance. The studies were carried out by a team grouping engineers from the 3 EDF's Divisions (Engineering-Generation-Research), and working together in a Concurrent Engineering-Mode. This team works in close collaboration with the vendors and the German Utilities involved in the REP 2000 EPR program. The implementation of the CIDEM process constitutes for EDF a new approach to the study of the new Nuclear Power Plant projects. The studies conducted in the availability field have already highlighted a number of critical points and have made it possible to establish a series of specifications for the REP 2000/EPR project. The integration in the design process of Preventive Maintenance and Logistic Support studies will allow a better control of the maintenance cost. The competitiveness of nuclear energy greatly depends on the success of such an approach. (author)

  16. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition are all needed. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates and is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remediation activity. However, risks from all of the remediation activities, decontamination and decommissioning activities, and normal ongoing operations are imposed upon the Rocky Flats workers, the surrounding public, and the environment. Comparative Risk Analysis will provide risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures by focusing these resources on the largest risks first. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. The Comparative Risk Analysis methodology Group, consisting of community stakeholders, was established. Early stakeholder involvement in the risk analysis methodology development provides an opportunity for stakeholders to influence the risk information delivered to a decision-maker. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  17. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  18. Technical Integration of SMART Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, P. H.; Noh, P. C. (and others)

    2006-12-15

    Preliminary experimental tests were carried out using the thermal-hydraulic integral test facility, VISTA (Experimental Verification by Integral Simulation of Transients and Accidents), which has been constructed to simulate the SMART-P. The VISTA facility is an integral test facility including the primary and secondary systems as well as safety-related Passive Residual heat removal (PRHR) systems. The integrated SMART desalination plant consists of Multi Effect Distillation Process combined with Thermal-Vapor Compressor(MED-TVC) and coupled with the extracted steam from turbine through the steam transformer. Steam transformer produces the main pressure steam and supplies to the MED-TVC unit. MED-TVC was selected as a desalination process coupled with SMART, since the thermal vapor compression is very effective where the steam is available at high temperature and pressure conditions than required in the evaporator. The standard design of the SMART desalination plant is under development as a part of the SMART project. This report describes design concept of these systems and their requirements.

  19. Tecnatom support to new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, A. B.

    2009-10-01

    Tecnatom is a Spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. It has worked in over 30 countries in activities related to the operation and maintenance of nuclear power plants. Along this half century of history. Tecnatom has been providing its services to nuclear utilities, regulators, NPP vendors, NPP owners / operators and nuclear fuel manufacturers not only in Spain but also abroad. It started to work in the design of new nuclear power plants in the early 90 s and since then has continued collaborating with different suppliers in the design and licensing of new reactors especially in the areas of plant systems design, man-machine interface design, main control room simulators building, training, qualification of equipment and PSI/ISI engineering services. Some challenges to the reactivation of nuclear power plants construction are common worldwide, including: regulatory processes, workforce availability, construction project management, etc. Being some keys to success the following: apply qualified resources, enough resources for early planning, project leadership, organization and integration, establish a strong integrated management team. The goal of this paper is to inform regarding the capabilities of Tecnatom in the construction of new power plants. (Author)

  20. Establishment of the Integrated Plant Data Warehouse

    International Nuclear Information System (INIS)

    Oota, Yoshimi; Yoshinaga, Toshiaki

    1999-01-01

    This paper presents 'The Establishment of the Integrated Plant Data Warehouse and Verification Tests on Inter-corporate Electronic Commerce based on the Data Warehouse (PDWH)', one of the 'Shared Infrastructure for the Electronic Commerce Consolidation Project', promoted by the Ministry of International Trade and Industry (MITI) through the Information-Technology Promotion Agency (IPA), Japan. A study group called Japan Plant EC (PlantEC) was organized to perform relevant activities. One of the main activities of plantEC involves the construction of the Integrated (including manufacturers, engineering companies, plant construction companies, and machinery and parts manufacturers, etc.) Data Warehouse which is an essential part of the infrastructure necessary for a system to share information on industrial life cycle ranging from planning/designing to operation/maintenance. Another activity is the utilization of this warehouse for the purpose of conducting verification tests to prove its usefulness. Through these verification tests, PlantEC will endeavor to establish a warehouse with standardized data which can be used for the infrastructure of EC in the process plant industry. (author)

  1. Establishment of the Integrated Plant Data Warehouse

    Energy Technology Data Exchange (ETDEWEB)

    Oota, Yoshimi; Yoshinaga, Toshiaki [Hitachi Works, Hitachi Ltd., hitachi, Ibaraki (Japan)

    1999-07-01

    This paper presents 'The Establishment of the Integrated Plant Data Warehouse and Verification Tests on Inter-corporate Electronic Commerce based on the Data Warehouse (PDWH)', one of the 'Shared Infrastructure for the Electronic Commerce Consolidation Project', promoted by the Ministry of International Trade and Industry (MITI) through the Information-Technology Promotion Agency (IPA), Japan. A study group called Japan Plant EC (PlantEC) was organized to perform relevant activities. One of the main activities of plantEC involves the construction of the Integrated (including manufacturers, engineering companies, plant construction companies, and machinery and parts manufacturers, etc.) Data Warehouse which is an essential part of the infrastructure necessary for a system to share information on industrial life cycle ranging from planning/designing to operation/maintenance. Another activity is the utilization of this warehouse for the purpose of conducting verification tests to prove its usefulness. Through these verification tests, PlantEC will endeavor to establish a warehouse with standardized data which can be used for the infrastructure of EC in the process plant industry. (author)

  2. The Planteome database: an integrated resource for reference ontologies, plant genomics and phenomics

    Science.gov (United States)

    Cooper, Laurel; Meier, Austin; Laporte, Marie-Angélique; Elser, Justin L; Mungall, Chris; Sinn, Brandon T; Cavaliere, Dario; Carbon, Seth; Dunn, Nathan A; Smith, Barry; Qu, Botong; Preece, Justin; Zhang, Eugene; Todorovic, Sinisa; Gkoutos, Georgios; Doonan, John H; Stevenson, Dennis W; Arnaud, Elizabeth

    2018-01-01

    Abstract The Planteome project (http://www.planteome.org) provides a suite of reference and species-specific ontologies for plants and annotations to genes and phenotypes. Ontologies serve as common standards for semantic integration of a large and growing corpus of plant genomics, phenomics and genetics data. The reference ontologies include the Plant Ontology, Plant Trait Ontology and the Plant Experimental Conditions Ontology developed by the Planteome project, along with the Gene Ontology, Chemical Entities of Biological Interest, Phenotype and Attribute Ontology, and others. The project also provides access to species-specific Crop Ontologies developed by various plant breeding and research communities from around the world. We provide integrated data on plant traits, phenotypes, and gene function and expression from 95 plant taxa, annotated with reference ontology terms. The Planteome project is developing a plant gene annotation platform; Planteome Noctua, to facilitate community engagement. All the Planteome ontologies are publicly available and are maintained at the Planteome GitHub site (https://github.com/Planteome) for sharing, tracking revisions and new requests. The annotated data are freely accessible from the ontology browser (http://browser.planteome.org/amigo) and our data repository. PMID:29186578

  3. Optimizing integrated reference cases in the OCTAVIUS project

    DEFF Research Database (Denmark)

    Kvamsdal, Hanne M.; Ehlers, Sören; Kather, Alfons

    2016-01-01

    . This is important especially for the coal fired power plant, where integration of waste heat from the capture plant or the CO2 compressor intercoolers can lead to a significant increase in overall efficiency. The configuration of intercoolers for the CO2 compressor is adapted to achieve the highest overall...... the CESAR, CAESAR, and DECARBit projects, two reference power plants are modelled in Ebsilon®Professional. The first is an 800 MWe coal case, the second a 430 MWe natural gas combined cycle (NGCC) case. For each power plant two separate capture plants are considered: one using 30 wt% MEA as solvent system...... efficiency. For the natural gas combined cycle plant, integration is not that beneficial, since there is no heat sink available in the water steam cycle. In the end, the cost of electricity and cost of CO2 avoided is calculated for all four cases. While the CESAR1 solvent system in a conventional absorber...

  4. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  5. Plant Biology Science Projects.

    Science.gov (United States)

    Hershey, David R.

    This book contains science projects about seed plants that deal with plant physiology, plant ecology, and plant agriculture. Each of the projects includes a step-by-step experiment followed by suggestions for further investigations. Chapters include: (1) "Bean Seed Imbibition"; (2) "Germination Percentages of Different Types of Seeds"; (3)…

  6. Analysis of integrated plant upgrading/life extension programs

    International Nuclear Information System (INIS)

    McCutchan, D.A.; Massie, H.W. Jr.; McFetridge, R.H.

    1988-01-01

    A present-worth generating cost model has been developed and used to evaluate the economic value of integrated plant upgrading life extension project in nuclear power plants. This paper shows that integrated plant upgrading programs can be developed in which a mix of near-term availability, power rating, and heat rate improvements can be obtained in combination with life extension. All significant benefits and costs are evaluated from the viewpoint of the utility, as measured in discounted revenue requirement differentials between alternative plans which are equivalent in system generating capacity. The near-term upgrading benefits are shown to enhance the benefit picture substantially. In some cases the net benefit is positive, even if the actual life extension proves to be less than expected

  7. Integrated plant information technology design support functionality

    International Nuclear Information System (INIS)

    Kim, Yeon Seung; Kim, Dae Jin; Barber, P. W.; Goland, D.

    1996-06-01

    This technical report was written as a result of Integrated Plant Information System (IPIS) feasibility study on CANDU 9 project which had been carried out from January, 1994 to March, 1994 at AECL (Atomic Energy Canada Limited) in Canada. From 1987, AECL had done endeavour to change engineering work process from paper based work process to computer based work process through CANDU 3 project. Even though AECL had a lot of good results form computerizing the Process Engineering, Instrumentation Control and Electrical Engineering, Mechanical Engineering, Computer Aided Design and Drafting, and Document Management System, but there remains the problem of information isolation and integration. On this feasibility study, IPIS design support functionality guideline was suggested by evaluating current AECL CAE tools, analyzing computer aided engineering task and work flow, investigating request for implementing integrated computer aided engineering and describing Korean request for future CANDU design including CANDU 9. 6 figs. (Author)

  8. Integrated plant information technology design support functionality

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yeon Seung; Kim, Dae Jin [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of); Barber, P W; Goland, D [Atomic Energy Canada Ltd., (Canada)

    1996-06-01

    This technical report was written as a result of Integrated Plant Information System (IPIS) feasibility study on CANDU 9 project which had been carried out from January, 1994 to March, 1994 at AECL (Atomic Energy Canada Limited) in Canada. From 1987, AECL had done endeavour to change engineering work process from paper based work process to computer based work process through CANDU 3 project. Even though AECL had a lot of good results form computerizing the Process Engineering, Instrumentation Control and Electrical Engineering, Mechanical Engineering, Computer Aided Design and Drafting, and Document Management System, but there remains the problem of information isolation and integration. On this feasibility study, IPIS design support functionality guideline was suggested by evaluating current AECL CAE tools, analyzing computer aided engineering task and work flow, investigating request for implementing integrated computer aided engineering and describing Korean request for future CANDU design including CANDU 9. 6 figs. (Author).

  9. Integrated Gasification SOFC Plant with a Steam Plant

    DEFF Research Database (Denmark)

    Rokni, Masoud; Pierobon, Leonardo

    2011-01-01

    A hybrid Solid Oxide Fuel Cell (SOFC) and Steam Turbine (ST) plant is integrated with a gasification plant. Wood chips are fed to the gasification plant to produce biogas and then this gas is fed into the anode side of a SOFC cycle to produce electricity and heat. The gases from the SOFC stacks...... enter into a burner to burn the rest of the fuel. The offgases after the burner are now used to generate steam in a Heat Recovery Steam Generator (HRSG). The generated steam is expanded in a ST to produce additional power. Thus a triple hybrid plant based on a gasification plant, a SOFC plant...... and a steam plant is presented and studied. The plant is called as IGSS (Integrated Gasification SOFC Steam plant). Different systems layouts are presented and investigated. Electrical efficiencies up to 56% are achieved which is considerably higher than the conventional integrated gasification combined...

  10. Management of delayed nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  11. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  12. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GIS) mbH, Weinheim (Germany)

    2014-07-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  13. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  14. System 80+ integrated design of a complete plant

    International Nuclear Information System (INIS)

    Turk, R.S.; Stamm, S.L.; Fox, W.A.

    1992-01-01

    In 1985, ABB-Combustion Engineering Nuclear Power (ABB-CENP) and elements of Duke Power Company [now Duke Engineering ampersand Services (DE ampersand S)] joined forces under the aegis of the Electric Power Research Institute (EPRI) Advanced Light Water Reactor (ALWR) Program to develop, with the sponsoring utilities, the design requirements for the next generation of nuclear power plants. With support from the US Department of Energy, ABB-CENP and DE ampersand S again teamed up the following year to initiate a project to design and license the System 80+ standard plant design, an advanced pressurized water reactor that meets these utility requirements. A distinguishing feature of the System 80+ standard design is that it is an essentially complete plant, predesigned and prelicensed to ensure rapid and economical construction. This is in stark contrast to typical prior conduct, where the reactor vendor offered only the nuclear steam supply system and the plant was built on a design-as-you-go basis with constant pressure to release individual elements of the plant design for construction or procurement as soon as possible. Now, however, the design process can be integrated over the total plant, ensuring that the goals set for ALWRs can be met. This integrated design process is manifested in several ways: (1) broad-based participation during the design process by involving designers, analysts, suppliers, constructors, and operators; (2) use of probabilistic risk assessment (PRA) as a design tool to aid in evaluating design features on a total-plant basis; (3) application of human factors engineering methods to a total plant distributed control system to improve the human-machine interface in the design; and (4) use of computer-aided design to enhance assessment of interactions and impacts of all aspects of the total plant. Each of these aspects of integrated plant design is discussed in this paper

  15. Developments of integrity evaluation technology for pressurized components in nuclear power plant and IT based integrity evaluation system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Jin; Choi, Jae Boong; Shim, Do Jun [Sungkyunkwan Univ., Seoul (Korea, Republic of)] (and others)

    2003-03-15

    The objective of this research is to develop an efficient evaluation technology and to investigate applicability of newly-developed technology, such as internet-based cyber platform, to operating power plants. Development of efficient evaluation systems for Nuclear Power Plant components, based on structural integrity assessment techniques, are increasingly demanded for safe operation with the increasing operating period of Nuclear Power Plants. The following five topics are covered in this project: development of assessment method for wall-thinned nuclear piping based on pipe test; development of structural integrity program for steam generator tubes with cracks of various shape; development of fatigue life evaluation system for mam components of NPP; development of internet-based cyber platform and integrity program for primary components of NPP; effect of aging on strength of dissimilar welds.

  16. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  17. Conservation and restoration of indigenous plants to improve community livelihoods: the Useful Plants Project

    Science.gov (United States)

    Ulian, Tiziana; Sacandé, Moctar; Mattana, Efisio

    2014-05-01

    Kew's Millennium Seed Bank partnership (MSBP) is one of the largest ex situ plant conservation initiatives, which is focused on saving plants in and from regions most at risk, particularly in drylands. Seeds are collected and stored in seed banks in the country of origin and duplicated in the Millennium Seed Bank in the UK. The MSBP also strengthens the capacity of local communities to successfully conserve and sustainably use indigenous plants, which are important for their wellbeing. Since 2007, high quality seed collections and research information have been gathered on ca. 700 useful indigenous plant species that were selected by communities in Botswana, Kenya, Mali, Mexico and South Africa through Project MGU - The Useful Plants Project. These communities range from various farmer's groups and organisations to traditional healers, organic cotton/crop producers and primary schools. The information on seed conservation and plant propagation was used to train communities and to propagate ca. 200 species that were then planted in local gardens, and as species reintroduced for reforestation programmes and enriching village forests. Experimental plots have also been established to further investigate the field performance (plant survival and growth rate) of indigenous species, using low cost procedures. In addition, the activities support revenue generation for local communities directly through the sustainable use of plant products or indirectly through wider environmental and cultural services. This project has confirmed the potential of biodiversity conservation to improve food security and human health, enhance community livelihoods and strengthen the resilience of land and people to the changing climate. This approach of using indigenous species and having local communities play a central role from the selection of species to their planting and establishment, supported by complementary research, may represent a model for other regions of the world, where

  18. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  19. Nuclear power plant Angra integrated enterprise management system

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2009-01-01

    The characteristics and peculiarities of the Nuclear Power Plant ANGRA 3 enterprise, amongst which its technical complexity, the size of the project and of the supplies of goods and services contracted for for the Brazilian and foreign scopes, the variety of contractors and participants involved in the implementation, associated with the need of integrated management of all the activities of the enterprise, requires the setting of standardized criteria and procedures to be adopted by the enterprise Project Management Team and by all involved ELETRONUCLEAR (ETN) Units, Suppliers and Contractors for Brazilian and foreign goods and services for the execution of the activities related to overall enterprise planning. These criteria and procedures aim at covering the five Project Management Process Groups: Initiating Process Group, Planning Process Group, Execution Process Group, Monitoring and Controlling Process Group and Closing Process Group. For the ANGRA 3 enterprise, ETN developed the Integrated Enterprise Management System - INTEGRA, being the software 'Primavera Enterprise Project Management' a fundamental part of this system. The aim of this paper is to describe the main concepts involving the ANGRA 3 enterprise management, and the integration between the processes, including all disciplines in all phases of the enterprise life cycle, such as: Nuclear and Environmental Licensing, Infrastructure, National and Foreign Engineering, National and Import Supplies, Civil Works, Electromechanical Erection, Commissioning. (author)

  20. Evaluation of the integrity and duration of the Laguna Verde nuclear power plant life- Plant Life Management program (PLIM). TC MEX 04/53 Technical Cooperation Project

    International Nuclear Information System (INIS)

    Arganis J, C.R.; Diaz S, A.; Aguilar T, J.A.

    2006-01-01

    As part of the IAEA TC MEX 04/53 Project 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Handling Program of plant' whose objective is the one of beginning the actions to apply the methodology of Handling of plant life in the Unit 1 of the Laguna Verde Nucleo electric Central for to obtain the Renovation of License in 2020 the ININ, through the Department of Synthesis and Characterization of materials has carried out more of 20 analysis of susceptibility to the intergranular cracking for corrosion under effort in interns so much of the reactor of the unit 1 like of the unit 2 documenting the current state of components based on the type or types of materials that conform them, to it thermomechanical history, operational and of production, as well as of the particularities associated to its use and operation. For the application of the methodology of life handling of plant 5 structure systems or pilot components were selected, to carry out the programs of handling of the aging and handling of plant life: The encircling of the reactor core (Core Shroud), the reactor pressure vessel (Reactor Pressure Vessel), the primary container (Primary Containment), the recirculation system of feeding water (Reactor Feed Water) and cables. (Author)

  1. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  2. Physiological integration affects growth form and competitive ability in clonal plants

    Czech Academy of Sciences Publication Activity Database

    Herben, Tomáš

    2004-01-01

    Roč. 18, - (2004), s. 493-520 ISSN 0269-7653 R&D Projects: GA ČR(CZ) GA206/02/0953 Institutional research plan: CEZ:AV0Z6005908 Keywords : competitive ability * Physiological integration * clonal plants Subject RIV: EF - Botanics Impact factor: 3.215, year: 2004

  3. Integrated project delivery : The designer as integrator

    NARCIS (Netherlands)

    Wamelink, J.W.F.; Koolwijk, J.S.J.; van Doorn, A.J.

    2012-01-01

    Process innovation related to integrated project delivery is an important topic in the building industry. Studies on process innovation through the use of integrated contracts usually focus on contractors, and particularly on the possibility of forward integration into the building process. Three

  4. Basic Study on Data-Centric design information integration system framework development for adapting Nuclear Power Plant construction in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Byung Ki [KHNP, Gyeongju (Korea, Republic of)

    2016-05-15

    This study established the concept of data-centric design, which is the latest design technique, by analyzing the existing literature so that the data-centric design would be applied to the nuclear power plant projects in Korea and analyzed the status of data-centric design application by the advanced companies and the domestic design companies participating in the nuclear power plant projects. By analyzing the function of the 3D CAD commercial system and all design drawings used in the nuclear power plant projects in Korea, a data-centric design integrated system model has been developed. This study established the concept of data-centric design technology, analyzed the functions of the plant architect engineering (A/E) software being globally used in the plant field and the design process status of nuclear power plant projects in Korea. A design information integration system building model, which is capable of data-centric design, in the place of the existing document-centric system design such as P and ID and SLD, has been suggested through the investigation on the data-centric design cases of the advanced companies. The major functions of the suggested model required for the application to the domestic industry were drawn. The suggested framework builds the field design, which was performed in the 3D system of the constructor, as an owner's field design system, which can manage all design drawings generated from the field design and the related information in integrated way. An as-built full model integrated of plant architect engineering, supplier design and field design is built. It is handed over to the operation team at the O and M stage and utilized in the maintenance and repair. As a power plant full model of future construction project has been enabled, an improved design process has been suggested, in which only the design change information during the plant architect engineering (A/E) and the design change information during the field design

  5. Architecturally integrated PV system at the Ford Bridgend Engine Plant

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, K.; Phillips, R.

    2001-07-01

    The aim of the project was to design and install a solar photovoltaic (PV) plant that could be retrofitted into an existing factory and to evaluate the cost and advantages of using the most recent advances in photovoltaic technology as follows: to demonstrate the use of the latest mono crystalline silicon technology within a large scale manufacturing environment, with the long term view of designing a state of the art installation for use in an environmentally sensitive {sup F}actory of the Future{sup .} To determine the performance and operating costs of a photovoltaic plant in northern latitudes thus providing data for the potential use of similar integrated systems elsewhere in the UK and Northern Europe. To evaluate the long term behaviour of an integrated system and its component parts. To demonstrate the feasibility of retrofitting PV roof lights into a fully operational manufacturing plant. To provide natural daylight into the manufacturing facility thereby improving the working environment, enhancing productivity and reducing the electrical lighting load within the plant during daylight hours. (author)

  6. MHD Integrated Topping Cycle Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

  7. Fiscal 1998 research report. Research on the possibility of promoting CDM project through technology transfer with plant exports; 1998 nendo chosa hokokusho. Plant yushutsugata gijutsu iten wo tsujita CDM project suishin kanosei ni kansuru chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Study was made on promotion of CDM (clean development mechanism) project through technology transfer with plant exports. Although CDM system was provided in COP3 on climate change held in Kyoto in 1997, its detailed rules including project approval are yet undecided, and only the schedule to provide the detailed rules until COP6 in 2000 was decided in COP4 in 1998. The common recognition that the CDM project with plant exports produces various merits for both Japan and the partner country is increasing. However, from the viewpoint of forming concrete CDM projects, most Japanese enterprises are passive in approach to the CDM project because of no detailed design of CDM, uncertain profitability and procedures, and avoidance of additional burdens. Plant export is also difficult because of the fact that assessment of a new project is difficult. Enterprises' deeper recognition on the CDM project, and a governmental integrated support system are desirable. (NEDO)

  8. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  9. A study of a high temperature nuclear power plant incorporating a non-integrated indirect cycle gas turbine

    International Nuclear Information System (INIS)

    Sarlos, G.; Helbling, W.; Zollinger, E.; Gregory, N.; Luchsinger, H.

    1982-04-01

    In connection with the HHT-project, the Swiss Federal Institute for Reactor Research has performed a study of a 1640-MWth HTR-plant incorporating a non-integrated indirect cycle gas turbine with two-stage intercooling, as a possibility of simplifying and reducing the cost of the HHT-demonstration plant. In this paper, the plant design is described and compared with the HHT-demonstration plant (a CCGT integrated plant with single stage intercooling). Also included is an evaluation of the various advantages and disadvantages of this design together with the presentation of some of the sensitivity results. (Auth.)

  10. Integrating availability and maintenance objectives in plant design. EDF approach

    International Nuclear Information System (INIS)

    Degrave, Claude; Martin-Onraet, Michel

    1995-01-01

    Energy self sufficiency is a major strategic necessity for France. Regarding the fossil fuels power, competitiveness of nuclear energy is a key goal for Electricite de France. Accordingly, for future nuclear power plants to remain competitive, it is necessary to maintain the kWh production costs of the future units at a level close to those of the latest units under construction (N4 series), while raising the safety level. EDF therefore decided to implement an analytical and systematic process for study of the new projects to optimize the design by integration of the maintenance (durations, costs), availability and radiation exposure goals from the related operating experience. This approach, CIDEM (French acronym for Design Integrating Availability, operating Experience and Maintenance) aims at a single goal: to minimize the kWh production cost incorporating investment, operation and fuel costs, allowing for the operating experience from French and foreign units. The implementation of the CIDEM process constitutes for EDF a new approach to the study of the new Nuclear Power Plant projects. The competitivity of nuclear energy greatly depends on the success of such an approach. The studies conducted in the availability field have already highlighted a number of critical points and have made it possible to define the corresponding goal allocations and to establish a first series of structuring specifications for the project. (J.P.N.)

  11. Current situation of the project of 3. and 4. block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Suchy, L.

    2006-01-01

    The contribution shows the basic information about the crucial milestone of 3. building and the current situation of the project of 3. and 4. block of the nuclear power plant Mochovce. Contribution also shows what activities were realized and what material in area of designation of the technical and safety standard of the project was elaborated in the past, the main activities planned for 2006 have been described, support for Feasibility Study elaborated by ENEL and description of the integrated management system. The basic thesis crucial for the next steps on the project of 3. and 4. block of Nuclear Power Plant Mochovce is presented in the conclusion

  12. Integrated disposal Facility Sagebrush Habitat Mitigation Project: FY2007 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2007-09-01

    This report summarizes the first year survival of sagebrush seedlings planted as compensatory mitigation for the Integrated Disposal Facility Project. Approximately 42,600 bare root seedlings and 26,000 pluglings were planted at a mitigation site along Army Loop Road in February 2007. Initial baseline monitoring occurred in March 2007, and first summer survival was assessed in September 2007. Overall survival was 19%, with bare root survival being marginally better than pluglings (21% versus 14%). Likely major factors contributing to low survival were late season planting and insufficient soil moisture during seedling establishment.

  13. Integration of artificial intelligence systems for nuclear power plant surveillance and diagnostics

    International Nuclear Information System (INIS)

    Uhrig, R.E.; Hines, J.W.; Nelson, W.R.

    1998-01-01

    The objective of this program is to design, construct, operate, test, and evaluate a prototype integrated monitoring and diagnostic system for a nuclear power plant. It is anticipated that this technology will have wide application to other complex systems (e.g., fossil power plants, chemical processing plants, and possibly air traffic control systems). Over the past decade, the University of Tennessee (UT) and others have carried out many projects utilizing various methodologies of artificial intelligence (expert systems, neural networks, fuzzy systems, and genetic algorithms) to enhance the performance (safety, efficiency, reliability, and availability) of nuclear power plants. Investigations and studies have included a) instrumentation surveillance and calibration validation, b) inferential sensing to calibration of feedwater venturi flow during fouling, c) thermodynamic performance modeling with iterative improvement of plant beat rate, d) diagnosis of nuclear power plant transients, and e) increase in thermal power through monitoring of DNBR (Departure from Nucleate Boiling Regime). To increase the likelihood of these individual systems being used in a nuclear power plant, they must be integrated into a single system that operates virtually autonomously, collecting, interpreting, and providing information to the operators in a simple and understandable format. (author)

  14. Integration of artificial intelligence systems for nuclear power plant surveillance and diagnostics

    Energy Technology Data Exchange (ETDEWEB)

    Uhrig, R.E.; Hines, J.W.; Nelson, W.R.

    1998-07-01

    The objective of this program is to design, construct, operate, test, and evaluate a prototype integrated monitoring and diagnostic system for a nuclear power plant. It is anticipated that this technology will have wide application to other complex systems (e.g., fossil power plants, chemical processing plants, and possibly air traffic control systems). Over the past decade, the University of Tennessee (UT) and others have carried out many projects utilizing various methodologies of artificial intelligence (expert systems, neural networks, fuzzy systems, and genetic algorithms) to enhance the performance (safety, efficiency, reliability, and availability) of nuclear power plants. Investigations and studies have included a) instrumentation surveillance and calibration validation, b) inferential sensing to calibration of feedwater venturi flow during fouling, c) thermodynamic performance modeling with iterative improvement of plant beat rate, d) diagnosis of nuclear power plant transients, and e) increase in thermal power through monitoring of DNBR (Departure from Nucleate Boiling Regime). To increase the likelihood of these individual systems being used in a nuclear power plant, they must be integrated into a single system that operates virtually autonomously, collecting, interpreting, and providing information to the operators in a simple and understandable format. (author)

  15. Nuclear plants gain integrated information systems

    International Nuclear Information System (INIS)

    Villavicencio-Ramirez, A.; Rodriquez-Alvarez, J.M.

    1994-01-01

    With the objective of simplifying the complex mesh of computing devices employed within nuclear power plants, modern technology and integration techniques are being used to form centralized (but backed up) databases and distributed processing and display networks. Benefits are immediate as a result of the integration and the use of standards. The use of a unique data acquisition and database subsystem optimizes the high costs of engineering, as this task is done only once for the life span of the system. This also contributes towards a uniform user interface and allows for graceful expansion and maintenance. This article features an integrated information system, Sistema Integral de Informacion de Proceso (SIIP). The development of this system enabled the Laguna Verde Nuclear Power plant to fully use the already existing universe of signals and its related engineering during all plant conditions, namely, start up, normal operation, transient analysis, and emergency operation. Integrated systems offer many advantages over segregated systems, and this experience should benefit similar development efforts in other electric power utilities, not only for nuclear but also for other types of generating plants

  16. Integration of torrefaction with steam power plant

    Energy Technology Data Exchange (ETDEWEB)

    Zakri, B.; Saari, J.; Sermyagina, E.; Vakkilainen, E.

    2013-09-01

    Torrefaction is one of the pretreatment technologies to enhance the fuel characteristics of biomass. The efficient and continuous operation of a torrefaction reactor, in the commercial scale, demands a secure biomass supply, in addition to adequate source of heat. Biorefinery plants or biomass-fuelled steam power plants have the potential to integrate with the torrefaction reactor to exchange heat and mass, using available infrastructure and energy sources. The technical feasibility of this integration is examined in this study. A new model for the torrefaction process is introduced and verified by the available experimental data. The torrefaction model is then integrated in different steam power plants to simulate possible mass and energy exchange between the reactor and the plants. The performance of the integrated plant is investigated for different configurations and the results are compared. (orig.)

  17. Integration of renewable energy plants based on generic data models in the energy management of a virtual power plant; Integration von erneuerbaren Energieanlagen auf Basis generischer Datenmodelle in das Energiemanagement eines virtuellen Kraftwerks

    Energy Technology Data Exchange (ETDEWEB)

    Wickert, Manuel; Slaby, Wolfgang; Hochloff, Patrick [Fraunhofer Institut fuer Windenergie und Energiesystemtechnik (IWES), Kassel (Germany); Winter, Martin [Siemens AG, Muenchen (Germany). Corporate Technology

    2012-07-01

    The integration of different types of energy resources manufactured by different vendors is one of the main challenges for virtual power plants. One of the important problems is a highly heterogeneous standardization environment for decentralized renewable energy resources. On the one hand proprietary solutions are implemented for some types of energy resources. In a future smart grid it is getting more and more important to handle decentralized energy generation. The project RegModHarz researched the dynamic integration of energy resources in virtual power plants based on generic data models. This paper introduces a concept for the integration of heterogeneous energy resources into the energy management of a virtual power plant using a uniform data model. On the assumption of a market-oriented virtual power plant the main attributes of this data model are generally identified and afterwards explained by examples. The capability of this data model is shown in a comprehensive field test with different renewable energy resources. (orig.)

  18. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  19. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  20. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  1. New concept for condition management of plants as a result of the KUNTO project. New operations approach reduces costs

    Energy Technology Data Exchange (ETDEWEB)

    McNiven, U.; Tamminen, L.

    1998-07-01

    IVO Generation Services Ltd. has carried out a project at the IVO Naantali power plant to develop the plants condition management. The project defines critical and monitored components for each system. In addition, recommendations for further action, investment proposals and suggestions for changes in maintenance and operations practices were supplied for the various systems in the plant. The systematic approach which was the result of the projects integrated into maintenance and operations practices where data collection and analysis is part of the routine. Up-to-date data is utilized in focusing maintenance and investments, in planning and reporting functions

  2. Dispatchable Solar Power Plant Project

    Energy Technology Data Exchange (ETDEWEB)

    Price, Henry [Solar Dynamics LLC, Broomfield, CO (United States)

    2018-01-31

    As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines

  3. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  4. The application of an integrated approach to design, procurement and construction in reducing overall nuclear power plant costs. Annex 19

    International Nuclear Information System (INIS)

    Didsbury, R.; Shalaby, B.A.; Torgerson, D.F.

    2002-01-01

    As part of its on-going efforts to reduce the cost of CANDU nuclear power plants, AECL has embarked on an integrated approach to design, procurement and construction activities associated with new CANDU 6 and CANDU 9 projects. The approach is predicated on the fact there is a vast quantity of information that needs to be managed and controlled over the life of a nuclear power plant project. Therefore, ensuring the completeness and correctness of all the information needed by all project participants, facilitating sharing of this information amongst the project's participants, and automating the various deliverable production processes offers significant potential not only for overall project cost (and schedule) savings but also for reducing operations and maintenance costs once the plant enters service. Facilitating and indeed of key importance to this approach is the use of a suite of integrated information technology-based engineering, procurement and project control tools used throughout the design, engineering, procurement and construction phases of the project. A unique and important feature of these tools is their high degree of integration both from a work process and a data perspective. Use of these tools is well underway on AECL's Qinshan Project which is realizing significant benefits in cost and schedule. This paper will describe the approach AECL is taking, along with the tools it has both put in place, and those additional items planned for the future along with the cost, schedule and quality benefits that arise from their use. Progress to date on the Qinshan project also will be discussed as well as the expected application to the plant once it has gone into service will also be discussed. (author)

  5. Intelligent Multi-Media Integrated Interface Project

    Science.gov (United States)

    1990-06-01

    been devoted to the application of aritificial intelligence technology to the development of human -computer interface technology that integrates speech...RADC-TR-90-128 Final Technical Report June 1090 AD-A225 973 INTELLIGENT MULTI-MEDIA INTEGRATED INTERFACE PROJECT Calspan-University of Buffalo...contractual obligations or notices on a specific document require that it be returned. INTELLIGENT MULTI-MEDIA INTEGRATED INTERFACE PROJECT J. G. Neal J. M

  6. Vestas Power Plant Solutions Integrating Wind, Solar PV and Energy Storage

    DEFF Research Database (Denmark)

    Petersen, Lennart; Hesselbæk, Bo; Martinez, Antonio

    2018-01-01

    This paper addresses a value proposition and feasible system topologies for hybrid power plant solutions integrating wind, solar PV and energy storage and moreover provides insights into Vestas hybrid power plant projects. Seen from the perspective of a wind power plant developer, these hybrid...... solutions provide a number of benefits that could potentially reduce the Levelized Cost of Energy and enable entrance to new markets for wind power and facilitate the transition to a more sustainable energy mix. First, various system topologies are described in order to distinguish the generic concepts...... for the electrical infrastructure of hybrid power plants. Subsequently, the benefits of combining wind and solar PV power as well as the advantages of combining variable renewable energy sources with energy storage are elaborated. Finally, the world’s first utility-scale hybrid power plant combining wind, solar PV...

  7. 75 FR 60405 - Lincoln National Forest, New Mexico, Integrated Non-Native Invasive Plant Project

    Science.gov (United States)

    2010-09-30

    ... Environmental Impact Statement. SUMMARY: The Lincoln National Forest (LNF) proposes to implement an integrated... by November 29, 2010. The draft environmental impact statement is expected January 2011 and the final environmental impact statement is expected April 2011. ADDRESSES: Send written comments to NNIP Project, Lincoln...

  8. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [Department of Energy, Office of River Protection, Richland, Washington (United States); Kacich, Richard M. [Bechtel National, Inc., Richland, WA (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Richland, WA (United States)

    2012-12-20

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  9. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2012-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  10. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  11. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [U.S. Department of Energy, Office of River Protection, Post Office Box 550, Richland, Washington 99352 (United States); Kacich, Richard M. [Bechtel National, Inc., 2435 Stevens Center Place, Richland, Washington 99354 (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Post Office Box 850, Richland, Washington 99352 (United States)

    2013-07-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines

  12. Integrating environmental control for coal plant efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Shepard, M

    1986-01-01

    As emission control requirements for power plants have grown more stringent, utilities have added new environmental protection technology. As environmental controls have been added one after another, plant designers have rarely had the opportunity to integrate these components with each other and the balance of the plant. Consequently they often cost more to build and operate and can reduce power plant efficiency and availability. With the aim of lowering the cost of environmental systems, a design approach known as integrated environmental control (IEC) has emerged. This is based on the premise that environmental controls can function most economically if they are designed integrally with other power generation equipment. EPRI has established an IEC progam to develop integrated design strategies and evaluate their net worth to utilities. Various aspects of this program are described. (3 refs.)

  13. Model Predictive Control of Integrated Gasification Combined Cycle Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    B. Wayne Bequette; Priyadarshi Mahapatra

    2010-08-31

    The primary project objectives were to understand how the process design of an integrated gasification combined cycle (IGCC) power plant affects the dynamic operability and controllability of the process. Steady-state and dynamic simulation models were developed to predict the process behavior during typical transients that occur in plant operation. Advanced control strategies were developed to improve the ability of the process to follow changes in the power load demand, and to improve performance during transitions between power levels. Another objective of the proposed work was to educate graduate and undergraduate students in the application of process systems and control to coal technology. Educational materials were developed for use in engineering courses to further broaden this exposure to many students. ASPENTECH software was used to perform steady-state and dynamic simulations of an IGCC power plant. Linear systems analysis techniques were used to assess the steady-state and dynamic operability of the power plant under various plant operating conditions. Model predictive control (MPC) strategies were developed to improve the dynamic operation of the power plants. MATLAB and SIMULINK software were used for systems analysis and control system design, and the SIMULINK functionality in ASPEN DYNAMICS was used to test the control strategies on the simulated process. Project funds were used to support a Ph.D. student to receive education and training in coal technology and the application of modeling and simulation techniques.

  14. Introduction of Integrity Evaluation Criteria Developing during and after fire for Nuclear Power Plant Buildings

    International Nuclear Information System (INIS)

    Lee, Jin Woo

    2016-01-01

    The first project for nuclear power plant built in Korea to taking account the engineering based approach was started on October 2015 including the whole process such as fire hazard analysis, standard fire modeling, cable tray fire with multi spurious operation, structural fire integrity evaluation, and large area fire induced air craft crash. This paper covers the brief developing scheme and roadmap focusing on structural fire evaluation criteria. The meaningful first step for developing the structural fire integrity in nuclear power plant building is started with the series of fire related sub sections mentioned in earlier section. The recognition and sufficient effort of fire research leads to set up the safe and reliable design of nuclear power plant

  15. Introduction of Integrity Evaluation Criteria Developing during and after fire for Nuclear Power Plant Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jin Woo [KEPCo, Gimcheon (Korea, Republic of)

    2016-05-15

    The first project for nuclear power plant built in Korea to taking account the engineering based approach was started on October 2015 including the whole process such as fire hazard analysis, standard fire modeling, cable tray fire with multi spurious operation, structural fire integrity evaluation, and large area fire induced air craft crash. This paper covers the brief developing scheme and roadmap focusing on structural fire evaluation criteria. The meaningful first step for developing the structural fire integrity in nuclear power plant building is started with the series of fire related sub sections mentioned in earlier section. The recognition and sufficient effort of fire research leads to set up the safe and reliable design of nuclear power plant.

  16. Integrity evaluation of power plant components by fracture mechanics and related techniques

    International Nuclear Information System (INIS)

    Mukherjee, B.; Vanderglas, M.L.; Davies, P.H.

    1982-01-01

    Power plant components can be subject to unexpected failures with serious consequences, unless careful attention is paid to minute crack defects and their possible growth. The Linear Elastic Fracture Mechanics approach to structural integrity evaluation, as it appears in the ASME Code, is discussed. Projects related to material data generation and the development of structural analysis methods to make the above method usable are described. Several integrity-related questions outside the scope of the Code guidelines are documented, concluding with comments on possible future developments

  17. Joint-operation in water resources project in Indonesia: Integrated or non-integrated

    Science.gov (United States)

    Ophiyandri, Taufika; Istijono, Bambang; Hidayat, Benny

    2017-11-01

    The construction of large water resources infrastructure project often involved a joint-operation (JO) project between two or more construction companies. The form of JO can be grouped into two categories - an integrated type and a non-integrated type. This paper investigates the reason of forming a JO project made by companies. The specific advantages and problems of JO project is also analysed in this paper. In order to achieve the objectives, three water resources infrastructure projects were selected as case studies. Data was gathered by conducting 11 semi-structured interviews to project owners, contractor managers, and project staffs. Data was analysed by means of content analysis. It was found that the most fundamental factor to form a JO is to win a competition or tender. An integrated model is in favour because it can reduce overhead costs and has a simple management system, while a non-integrated model is selected because it can avoid a sleeping partner and make contractor more responsible for their own job.

  18. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  19. Integration of artificial intelligence systems for nuclear power plants surveillance and diagnostics

    International Nuclear Information System (INIS)

    Chetry, Moon K.

    2012-01-01

    The objective of this program is to design, construct operate, test, and evaluate a prototype integrated monitoring and diagnostic system for a nuclear power plant. It is anticipated that this technology will have wide application to other complex systems (e.g., fossil power plants, chemical processing plants, and possibly air traffic control systems). Over the past decade, the University of Tennessee (UT) and others have carried out many projects utilizing various methodologies of artificial intelligence (expert systems, neural networks, fuzzy systems and genetic algorithms) to enhance the performance (safety, efficiency, reliability, and availability) of nuclear power plants. Investigations and studies have included a) instrumentation surveillance and calibration validation, b) inferential sensing to calibration of feed water venture flow during fouling, c) thermodynamic performance modeling with iterative improvement of plant heat rate, d) diagnosis of nuclear power plant transients

  20. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  1. Integrated plant life management (PLiM)-the IAEA contribution

    International Nuclear Information System (INIS)

    Kang, K.-S.; Clark, C.R.; Omoto, A.; )

    2005-01-01

    For the past couple of decades there has been a change of emphasis in the world nuclear power from that of building new Nuclear Power Plants (NPP) to that of taking measures to optimize the life cycle of operational plants. National approaches in many countries showed an increase of interest in Plant Life Management (PLiM), both in terms of plant service life assurance and in optimizing the service or operational life of NPP. A strong convergence of views is emerging from different National approaches, particularly in the area of the economic aspects of NPP operation and in the evolution in the scope of NPP PLIM. The latter can directly affect the cost of electricity from NPP in an increasingly competitive environment. The safety considerations of a NPP are paramount and those requirements have to be met to obtain and to extend/renew the operating license. To achieve the goal of the long term safe, economic and reliable operation of the plant an integrated Plant Life Management Programme (PLiM) is necessary. Some countries already have advanced PLiM Programmes while others still have none. The PLiM objective is to identify all that factors and requirements for the overall plant life cycle. The optimization of these requirements would allow for the minimum period of the investment return and maximum of the revenue from the sell of the produced electricity. Recognizing the importance of this issue and in response to the requests of the Member States the IAEA Division of Nuclear Power implements the Sub-programme on 'Engineering and Management Support for Competitive Nuclear Power'. Four projects within this sub-programme deal with different aspects of the NPP life cycle management with the aim to increase the capabilities of interested Member States in implementing and maintenance of the competitive and sustainable nuclear power. Although all four projects contain certain issues of PLiM there is one specific project on guidance on engineering and management practices

  2. Signal validation of SPDS variables for Westinghouse and Combustion Engineering plants - an EPRI project

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    Signal validation in the context of this project is the process of combining information from multiple plant sensors to produce highly reliable information about plant conditions. High information reliability is achieved by the use of redundant sources of information and by the inherent detection, identification, and isolation of faulty signals. The signal validation methodology that has been developed in previous EPRI-sponsored projects has been enhanced and applied toward validation of critical safety-related SPDS signals in the Northeast Utilities Millstone 3 Westinghouse PWR plant and the Millstone 2 Combustion Engineering PWR plant. The designs were implemented in FORTRAN software and tested off-line using recorded plant sensor data, RETRAN-generated simulation data, and data to exercise software logic branches and the integration of software modules. Designs and software modules have been developed for 15 variables to support six PWR SPDS critical safety functions as required by a utility advisory group attached to the project. The signal validation process automates a task currently performed by plant operators and does so with consistent, verified logic regardless of operator stress and training level. The methodology uses a simple structure of generic software blocks, a modular implementation, and it performs effectively within the processor and memory constraints of modern plant process computers. The ability to detect and isolate sensor failures with greater sensitivity, robustness, and coverage of common-cause failures should ultimately lead to improved plant availability, efficiency, and productivity

  3. Optimizing hourly hydro operations at the Salt Lake City Area integrated projects

    International Nuclear Information System (INIS)

    Veselka, T.D.; Hamilton, S.; McCoy, J.

    1995-01-01

    The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western's net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western's purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western's net revenue is computed

  4. Optimal integration of energy at the Combined Energy Plant in Norrkoeping -Integration of steam, hot water and district heat to biogas plants; Optimal integrering av energianvaendningen vid energikombinatet i Norrkoeping -Integrering av aanga, hetvatten och fjaerrvaerme till biogasanlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Benjaminsson, Johan; Goldschmidt, Barbara; Uddgren, Roger

    2010-09-15

    The background of this report is to investigate and highlight the benefits of establishing a biogas plant nearby a combined energy plant where steam and district heat is available. By using heat from the combined energy plant, more biogas can be produced as vehicle fuel instead of being used as fuel to heat the digester, the biogas upgrading plant or the dryer. The project's objective is to analyze where it is interesting with integration of heat to the biogas plant and to compare alternative technologies and possible integration options. The stakeholders of the study are industries with access to organic matter for biogas production and heat producers who can deliver thermal energy into biogas plants. The project was implemented by collection of information from the Haendeloe combined energy plant outside Norrkoeping where there is a cogeneration plant, an ethanol plant and a biogas plant. Case studies for the study have been carried out with proposals regarding how heat flows from the power plant and ethanol plant can be further integrated with the biogas plant. As case studies, both the current design of the biogas plant, as well as a fictional case in which half of all distillery residues was digested, have been evaluated. The case studies show that in today's biogas plant it is not economical to replace the existing biogas upgrading unit with water absorption to chemical absorption. The upgrading cost with water absorption at today's smaller facility is 0.11 kr/kWh and in order to obtain the same total cost of chemical absorption a steam price of 0.15 kr/kWh is required. For large gas flows, chemical absorption is an advantage since the technology is more suitable for upscaling in comparison with water absorption that must be delivered in multiple lines. Nevertheless, a possibility to recover waste heat from chemical absorption is necessary if the technology shall be competitive. If waste heat from both water absorption and chemical absorption

  5. Idea: an integrated set of tools for sustainable nuclear decommissioning projects

    International Nuclear Information System (INIS)

    Detilleux, M.; Centner, B.; Vanderperre, S.; Wacquier, W.

    2008-01-01

    Decommissioning of nuclear installations constitutes an important challenge and shall prove to the public that the whole nuclear life cycle is fully mastered by the nuclear industry. This could lead to an easier public acceptance of the construction of new nuclear power plants. When ceasing operation, nuclear installations owners and operators are looking for solutions in order to assess and keep decommissioning costs at a reasonable level, to fully characterise waste streams (in particular radiological inventories of difficult-to-measure radionuclides) and to reduce personnel exposure during the decommissioning activities taking into account several project, site and country specific constraints. In response to this need, Tractebel Engineering has developed IDEA (Integrated DEcommissioning Application), an integrated set of computer tools, to support the engineering activities to be carried out in the frame of a decommissioning project. IDEA provides optimized solutions from an economical, environmental, social and safety perspective. (authors)

  6. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  7. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  8. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  9. Integrated project-management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table.

  10. Integrated project-management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table

  11. Exotic plant species receive adequate pollinator service despite variable integration into plant-pollinator networks.

    Science.gov (United States)

    Thompson, Amibeth H; Knight, Tiffany M

    2018-05-01

    Both exotic and native plant species rely on insect pollinators for reproductive success, and yet few studies have evaluated whether and how exotic plant species receive services from native pollinators for successful reproduction in their introduced range. Plant species are expected to successfully reproduce in their exotic range if they have low reliance on animal pollinators or if they successfully integrate themselves into resident plant-pollinator networks. Here, we quantify the breeding system, network integration, and pollen limitation for ten focal exotic plant species in North America. Most exotic plant species relied on animal pollinators for reproduction, and these species varied in their network integration. However, plant reproduction was limited by pollen receipt for only one plant species. Our results demonstrate that even poorly integrated exotic plant species can still have high pollination service and high reproductive success. The comprehensive framework considered here provides a method to consider the contribution of plant breeding systems and the pollinator community to pollen limitation, and can be applied to future studies to provide a more synthetic understanding of the factors that determine reproductive success of exotic plant species.

  12. The Plant Genome Integrative Explorer Resource: PlantGenIE.org.

    Science.gov (United States)

    Sundell, David; Mannapperuma, Chanaka; Netotea, Sergiu; Delhomme, Nicolas; Lin, Yao-Cheng; Sjödin, Andreas; Van de Peer, Yves; Jansson, Stefan; Hvidsten, Torgeir R; Street, Nathaniel R

    2015-12-01

    Accessing and exploring large-scale genomics data sets remains a significant challenge to researchers without specialist bioinformatics training. We present the integrated PlantGenIE.org platform for exploration of Populus, conifer and Arabidopsis genomics data, which includes expression networks and associated visualization tools. Standard features of a model organism database are provided, including genome browsers, gene list annotation, Blast homology searches and gene information pages. Community annotation updating is supported via integration of WebApollo. We have produced an RNA-sequencing (RNA-Seq) expression atlas for Populus tremula and have integrated these data within the expression tools. An updated version of the ComPlEx resource for performing comparative plant expression analyses of gene coexpression network conservation between species has also been integrated. The PlantGenIE.org platform provides intuitive access to large-scale and genome-wide genomics data from model forest tree species, facilitating both community contributions to annotation improvement and tools supporting use of the included data resources to inform biological insight. © 2015 The Authors. New Phytologist © 2015 New Phytologist Trust.

  13. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  14. The Power Plant Mapping Student Project: Bringing Citizen Science to Schools

    Science.gov (United States)

    Tayne, K.; Oda, T.; Gurney, K. R.; O'Keeffe, D.; Petron, G.; Tans, P. P.; Frost, G. J.

    2014-12-01

    An emission inventory (EI) is a conventional tool to quantify and monitor anthropogenic emissions of greenhouse gases and air pollutants into the atmosphere. Gridded EI can visually show geographical patterns of emissions and their changes over time. These patterns, when available, are often determined using location data collected by regional governments, industries, and researchers. Datasets such as Carbon Monitoring and Action (CARMA, www.carma.org) are particularly useful for mapping emissions from large point sources and have been widely used in the EI community. The EI community is aware of potentially significant errors in the geographical locations of point sources, including power plants. The big challenge, however, is to review tens of thousands of power plant locations around the world and correct them where needed. The Power Plant Mapping Student Project (PPMSP) is a platform designed for students in 4th through 12th grade to improve the geographical location of power plants indicated in existing datasets to benefit international EI research. In PPMSP, we use VENTUS, a web-based platform (http://ventus.project.asu.edu/) that invites citizens to contribute power plant location data. Using VENTUS, students view scenes in the vicinity of reported power plant coordinates on Google Maps. Students either verify the location of a power plant or search for it within a designated radius using various indicators, an e-guide, and a power plant photo gallery for assistance. If the power plant cannot be found, students mark the plant as unverified. To assure quality for research use, the project contains multiple checkpoints and levels of review. While participating in meaningful research that directly benefits the EI research community, students are engaged in relevant science curricula designed to meet each grade level's Next Generation Science Standards. Students study energy, climate change, the atmosphere, and geographical information systems. The curricula is

  15. South Texas Native Plant Restoration Project

    Science.gov (United States)

    2012-10-01

    The South Texas Native Plant Restoration Project was a resounding success in that the primary goal of : developing commercial sources of native seed has been substantially met. By the conclusion of the project : on August 31, 2011, 20 native seed sou...

  16. Research and Development Technology Development Roadmaps for the Next Generation Nuclear Plant Project

    Energy Technology Data Exchange (ETDEWEB)

    Ian McKirdy

    2011-07-01

    The U.S. Department of Energy (DOE) has selected the high temperature gas-cooled reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for process heat, hydrogen and electricity production. The reactor will be graphite moderated with helium as the primary coolant and may be either prismatic or pebble-bed. Although, final design features have not yet been determined. Research and Development (R&D) activities are proceeding on those known plant systems to mature the technology, codify the materials for specific applications, and demonstrate the component and system viability in NGNP relevant and integrated environments. Collectively these R&D activities serve to reduce the project risk and enhance the probability of on-budget, on-schedule completion and NRC licensing. As the design progresses, in more detail, toward final design and approval for construction, selected components, which have not been used in a similar application, in a relevant environment nor integrated with other components and systems, must be tested to demonstrate viability at reduced scales and simulations prior to full scale operation. This report and its R&D TDRMs present the path forward and its significance in assuring technical readiness to perform the desired function by: Choreographing the integration between design and R&D activities; and proving selected design components in relevant applications.

  17. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  18. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  19. Plant Reliability - an Integrated System for Management (PR-ISM)

    International Nuclear Information System (INIS)

    Aukeman, M.C.; Leininger, E.G.; Carr, P.

    1984-01-01

    The Toledo Edison Company, located in Toledo, Ohio, United States of America, recently implemented a comprehensive maintenance management information system for the Davis-Besse Nuclear Power Station. The system is called PR-ISM, meaning Plant Reliability - An Integrated System for Management. PR-ISM provides the tools needed by station management to effectively plan and control maintenance and other plant activities. The PR-ISM system as it exists today consists of four integrated computer applications: equipment data base maintenance, maintenance work order control, administrative activity tracking, and technical specification compliance. PR-ISM is designed as an integrated on-line system and incorporates strong human factors features. PR-ISM provides each responsible person information to do his job on a daily basis and to look ahead towards future events. It goes beyond 'after the fact' reporting. In this respect, PR-ISM is an 'interactive' control system which: captures work requirements and commitments as they are identified, provides accurate and up-to-date status immediately to those who need it, simplifies paperwork and reduces the associated time delays, provides the information base for work management and reliability analysis, and improves productivity by replacing clerical tasks and consolidating maintenance activities. The functional and technical features of PR-ISM, the experience of Toledo Edison during the first year of operation, and the factors which led to the success of the development project are highlighted. (author)

  20. Integrated management for aging of Atucha Nuclear Power Plant

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Sabransky, M.; Fonseca, M.; Santich, J.; Pedernera, P.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina.. With the start-up of Atucha II and aiming to integrate the Ageing Management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) created an Ageing Management Department to cope with all ageing issues of both Atucha I and II. In this project both organization has formed a joint working group. The role of CNEA is providing technical support to the plant in the development of procedures a methodological framework for the Ageing Management Program of Atucha NPP. The main documents that have being issued so far are: . An Ageing Management Manual, including standard definition of Materials, Ageing Related Degradation Mechanisms, Operation Environments customized for Atucha NPP. . Walk down procedures and checklists aimed to systematize data collection during outages. . Procedures for performing Ageing Management Reviews and Maintenance Reviews for passive and active components. . Condition Assessments of several safety related systems. . Condition assessment of electrical components. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented (author)

  1. Successful Training Development and Implementation in Plant Modernization Projects

    International Nuclear Information System (INIS)

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  2. Integral Indicator of Ecological Footprint for Croatian Power Plants

    International Nuclear Information System (INIS)

    Strijov, V.; Granic, G.; Juric, Z.; Jelavic, B.; Antesevic Maricic, S.

    2009-01-01

    The main goal of this paper is to present the methodology of construction of the Integral Indicator for Croatian Thermal Power Plants and Combined Heat and Power Plants. The Integral Indicator is necessary to compare Power Plants selected according to a certain criterion. The criterion of the Ecological Footprint is chosen. The following features of the Power Plants are used: generated electricity and heat; consumed coal and liquid fuel; sulphur content in fuel; emitted CO 2 , SO 2 , NO x and particles. To construct the Integral Indicator the linear model is used. The model parameters are tuned by the Principal Component Analysis algorithm. The constructed Integral Indicator is compared with several others, such as Pareto-Optimal Slicing Indicator and Metric Indicator. The Integral Indicator keeps as much information about features of the Power Plants as possible; it is simple and robust.(author).

  3. Development of integrity evaluation technology for pressurized components in nuclear power plant and IT based integrity evaluation system

    International Nuclear Information System (INIS)

    Kim, Young Jin; Choi, Jae Boong; Shim, Do Jun

    2004-02-01

    The objective of this research is to develop on efficient integrity evaluation technology and to investigate the applicability of the newly-developed technology such as internet-based cyber platform etc. to Nuclear Power Plant(NPP) components. The development of an efficient structural integrity evaluation system is necessary for safe operation of NPP as the increase of operating periods. Moreover, material test data as well as emerging structural integrity assessment technology are also needed for the evaluation of aged components. The following five topics are covered in this project: development of the wall-thinning evaluation program for nuclear piping; development of structural integrity evaluation criteria for steam generator tubes with cracks of various shape; development of fatigue life evaluation system for major components of NPP; ingegration of internet-based cyber platform and integrity evaluation program for primary components of NPP; effects of aging on strength of dissimilar welds

  4. Development of integrity evaluation technology for pressurized components in nuclear power plant and IT based integrity evaluation system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Jin; Choi, Jae Boong; Shim, Do Jun [Sungkyunkwan Univ., Seoul (Korea, Republic of)] (and others)

    2004-02-15

    The objective of this research is to develop on efficient integrity evaluation technology and to investigate the applicability of the newly-developed technology such as internet-based cyber platform etc. to Nuclear Power Plant(NPP) components. The development of an efficient structural integrity evaluation system is necessary for safe operation of NPP as the increase of operating periods. Moreover, material test data as well as emerging structural integrity assessment technology are also needed for the evaluation of aged components. The following five topics are covered in this project: development of the wall-thinning evaluation program for nuclear piping; development of structural integrity evaluation criteria for steam generator tubes with cracks of various shape; development of fatigue life evaluation system for major components of NPP; ingegration of internet-based cyber platform and integrity evaluation program for primary components of NPP; effects of aging on strength of dissimilar welds.

  5. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  6. Working toward integrated models of alpine plant distribution.

    Science.gov (United States)

    Carlson, Bradley Z; Randin, Christophe F; Boulangeat, Isabelle; Lavergne, Sébastien; Thuiller, Wilfried; Choler, Philippe

    2013-10-01

    Species distribution models (SDMs) have been frequently employed to forecast the response of alpine plants to global changes. Efforts to model alpine plant distribution have thus far been primarily based on a correlative approach, in which ecological processes are implicitly addressed through a statistical relationship between observed species occurrences and environmental predictors. Recent evidence, however, highlights the shortcomings of correlative SDMs, especially in alpine landscapes where plant species tend to be decoupled from atmospheric conditions in micro-topographic habitats and are particularly exposed to geomorphic disturbances. While alpine plants respond to the same limiting factors as plants found at lower elevations, alpine environments impose a particular set of scale-dependent and hierarchical drivers that shape the realized niche of species and that require explicit consideration in a modelling context. Several recent studies in the European Alps have successfully integrated both correlative and process-based elements into distribution models of alpine plants, but for the time being a single integrative modelling framework that includes all key drivers remains elusive. As a first step in working toward a comprehensive integrated model applicable to alpine plant communities, we propose a conceptual framework that structures the primary mechanisms affecting alpine plant distributions. We group processes into four categories, including multi-scalar abiotic drivers, gradient dependent species interactions, dispersal and spatial-temporal plant responses to disturbance. Finally, we propose a methodological framework aimed at developing an integrated model to better predict alpine plant distribution.

  7. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  8. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  9. Summary of EPRI projects for improving power plant maintenance and maintainability

    International Nuclear Information System (INIS)

    Shugars, H.G.; Poole, D.N.; Pack, R.W.

    1979-01-01

    The Electric Power Research Institute is sponsoring projects to improve power plant maintenance and maintainability. Areas presently being emphasized are improvements in plant design for maintainability, improvements in performing nuclear plant refuelings, and development of on-line monitoring and diagnostic systems for various plant components. The seven projects are reviewed. They are: (1) human factors review of power plant maintainability; (2) refueling outage improvement; (3) on-line monitoring and diagnostics for power plant machinery; (4) acoustic emission and vibrati1on signature analysis of fossil fuel plant components; (5) acoustic monitoring of power plant valves; (6) on-line monitoring and diagnostics for generators; and (7) detection of water induction in steam turbines. Each project contractor and the project manager are listed for reference. 8 references

  10. Thermodynamic and economic analysis on geothermal integrated combined-cycle power plants

    International Nuclear Information System (INIS)

    Bettocchi, R.; Cantore, G.; Negri di Montenegro, G.; Gadda, E.

    1992-01-01

    This paper considers geothermal integrated power plants obtained matching a geothermal plant with, a two pressure level combined plant. The purpose of the paper is the evaluation of thermodynamic and economic aspects on geothermal integrated combined-cycle power plant and a comparison with conventional solutions. The results show that the integrated combined plant power is greater than the sum of combined cycle and geothermal plant powers considered separately and that the integrated plant can offer economic benefits reaching the 16% of the total capital required

  11. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  12. Sophistication and integration of plant engineering CAD-CAE systems

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Hanyu, Masaharu; Ota, Yoshimi; Kobayashi, Yasuhiro.

    1995-01-01

    In respective departments in charge of basic planning, design, manufacture, inspection and construction of nuclear power plants, by the positive utilization of CAD/CAE system, efficient workings have been advanced. This time, the plant integrated CAE system wich heightens the function of these individual systems, and can make workings efficient and advanced by unifying and integrating them was developed. This system is composed of the newly developed application system and the data base system which enables the unified management of engineering data and high speed data conversion in addition to the CAD system for three-dimensional plant layout planning. On the basis of the rich experience and the proposal of improvement of designers by the application of the CAD system for three-dimensional plant layout planning to actual machines, the automation, speed increase and the visualization of input and output by graphical user interface (GUI) in the processing of respective applications were made feasible. As the advancement of plant CAE system, scenic engineering system, integrated layout CAE system, electric instrumentation design CAE system and construction planning CAE system are described. As for the integration of plant CAE systems, the integrated engineering data base, the combination of plant CAE systems, and the operation management in the dispersed environment of networks are reported. At present, Hitachi Ltd. exerts efforts for the construction of atomic energy product in formation integrated management system as the second stage of integration. (K.I.)

  13. Integrated sustainable urban infrastructures in building projects

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Quitzau, Maj-Britt; Elle, Morten

    2007-01-01

    Current strategies in urban planning and development merely promote standardized building solutions, while failing to prioritize innovative approaches of integration between building projects and sustainable urban infrastructures. As a result of this, urban infrastructures – the urban veins...... – are outdated from a sustainability perspective. This paper looks into more holistic ways of approaching building projects and discuss whether this provide a basis for an increased integration of urban infrastructures within building projects. In our study, we especially emphasise how conventional ways...... of approaching building projects are influenced by lock-in of existing infrastructural systems and compare this with two examples of more holistic ways of approaching building projects, developed by two architecture firms. The paper points out that such holistic perspective in building projects provide...

  14. Integrated turbomachine oxygen plant

    Science.gov (United States)

    Anand, Ashok Kumar; DePuy, Richard Anthony; Muthaiah, Veerappan

    2014-06-17

    An integrated turbomachine oxygen plant includes a turbomachine and an air separation unit. One or more compressor pathways flow compressed air from a compressor through one or more of a combustor and a turbine expander to cool the combustor and/or the turbine expander. An air separation unit is operably connected to the one or more compressor pathways and is configured to separate the compressed air into oxygen and oxygen-depleted air. A method of air separation in an integrated turbomachine oxygen plant includes compressing a flow of air in a compressor of a turbomachine. The compressed flow of air is flowed through one or more of a combustor and a turbine expander of the turbomachine to cool the combustor and/or the turbine expander. The compressed flow of air is directed to an air separation unit and is separated into oxygen and oxygen-depleted air.

  15. Integrated CAD/CAE for nuclear power plants

    International Nuclear Information System (INIS)

    Lecoq, P.; Lachat, J.C.

    1987-01-01

    The size of the French nuclear power program has led both EDF and Framatome to equip themselves progressively with management software, computer-assisted design (CAD) systems, and computer-assisted engineering (CAE) systems. The nature of the projects and of the respective activities of EDF and Framatome determined the essential specifications of these computerized systems. EDF and Framatome have pooled their CAD/CAE efforts in a joint venture (Groupement d'Interet Economique) called GIAO, set up in 1985 by EDF and Aquitaine Systeme (a subsidiary of Framatome and Elf Aquitaine). GIAO's ambition is to become a pole of French CAD/CAE efforts and to foster progress in integrated computer-assisted engineering, by enlarging the synergy of EDF and Framatome in this field to other enterprises that participate in design and construction of complex industrial plants

  16. Managing the development of plant subsystems for a large international project

    International Nuclear Information System (INIS)

    Gurd, D.

    2012-01-01

    ITER is an international collaborative project under development by nations representing over one half of the world's population. Major components will be supplied by 'Domestic Agencies' representing the various participating countries. While the supervisory control system, known as CODAC, will be developed 'in fund' by the International Organization at the project site in the south of France, the EPICS and PLC-based plant control subsystems are to be developed and tested locally, where the subsystems themselves are being built. This is similar to the model used for the development of the Spallation Neutron Source, which was a US national collaboration. However the much more complex constraints of an international collaboration preclude the use of many specifics of the SNS collaboration approach. Moreover, procedures for final system integration and commissioning at ITER are not yet well defined. This paper will outline the particular issues either inherent in an international collaboration or specific to ITER, and will suggest approaches to mitigate those problems with the goal of assuring a successful and timely integration and commissioning phase. (author)

  17. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  18. Integration of multi-omics techniques and physiological phenotyping within a holistic phenomics approach to study senescence in model and crop plants

    Czech Academy of Sciences Publication Activity Database

    Großkinsky, D.K.; Syaifullah, S. J.; Roitsch, Thomas

    2017-01-01

    Roč. 99, č. 99 (2017), s. 1-20 ISSN 0022-0957 R&D Projects: GA MŠk(CZ) LO1415 Institutional support: RVO:67179843 Keywords : integrated approaches * multi-omics * phenomics * plant development * plant–environment interactions * plant phenotyping * plant physiology * plant senescence * senescence programme * systems biology Subject RIV: EH - Ecology, Behaviour OBOR OECD: Environmental sciences (social aspects to be 5.7) Impact factor: 5.830, year: 2016

  19. Application of integrated computer-aided engineering for design, construction and operation of nuclear power plant

    International Nuclear Information System (INIS)

    Kyung-shick Min; Byung-hun Lee

    1987-01-01

    Computer-aided-engineering (CAE) is an essential tool for modern nuclear power plant engineering. It greatly varies in definition, application, and technology from project to project and company to company. Despite the fast growing technologies and applications of CAE, its complexty and variety have thrown aonther puzzle to management of a nuclear project. Without due consideration of an integrated CAE system in early planning stage, the overall efficiency of a nuclear project would slow down due to the inefficiency in data flow. In this paper, practices and perspectives of CAE appliation are discussed under the Korea Power Engineering Company (KOPEC) philosophy in CAE approach. (author)

  20. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  1. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  2. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  3. Data integration aids understanding of butterfly-host plant networks.

    Science.gov (United States)

    Muto-Fujita, Ai; Takemoto, Kazuhiro; Kanaya, Shigehiko; Nakazato, Takeru; Tokimatsu, Toshiaki; Matsumoto, Natsushi; Kono, Mayo; Chubachi, Yuko; Ozaki, Katsuhisa; Kotera, Masaaki

    2017-03-06

    Although host-plant selection is a central topic in ecology, its general underpinnings are poorly understood. Here, we performed a case study focusing on the publicly available data on Japanese butterflies. A combined statistical analysis of plant-herbivore relationships and taxonomy revealed that some butterfly subfamilies in different families feed on the same plant families, and the occurrence of this phenomenon more than just by chance, thus indicating the independent acquisition of adaptive phenotypes to the same hosts. We consequently integrated plant-herbivore and plant-compound relationship data and conducted a statistical analysis to identify compounds unique to host plants of specific butterfly families. Some of the identified plant compounds are known to attract certain butterfly groups while repelling others. The additional incorporation of insect-compound relationship data revealed potential metabolic processes that are related to host plant selection. Our results demonstrate that data integration enables the computational detection of compounds putatively involved in particular interspecies interactions and that further data enrichment and integration of genomic and transcriptomic data facilitates the unveiling of the molecular mechanisms involved in host plant selection.

  4. Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants

    International Nuclear Information System (INIS)

    Mays, Gary T.; Belles, Randy; Cetiner, Mustafa Sacit; Howard, Rob L.; Liu, Cheng; Mueller, Don; Omitaomu, Olufemi A.; Peterson, Steven K.; Scaglione, John M.

    2012-01-01

    The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

  5. Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants

    Energy Technology Data Exchange (ETDEWEB)

    Mays, Gary T [ORNL; Belles, Randy [ORNL; Cetiner, Sacit M [ORNL; Howard, Rob L [ORNL; Liu, Cheng [ORNL; Mueller, Don [ORNL; Omitaomu, Olufemi A [ORNL; Peterson, Steven K [ORNL; Scaglione, John M [ORNL

    2012-06-01

    The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

  6. Guidelines for Application of the Master Curve Approach to Reactor Pressure Vessel Integrity in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lyssakov, V.N.; Kang, K.S.

    2005-01-01

    These guidelines have been developed under an International Atomic Energy Agency (IAEA) Co-ordinated Research Project (CRP) titled ''Surveillance Programme Results Application to Reactor Pressure Vessel Integrity Assessment.'' The IAEA has sponsored a series of five CRPs that have led to a focus on measuring the best irradiation fracture parameters using relatively small test specimens for assuring structural integrity of reactor pressure vessel (RPV) materials in Nuclear Power Plants (NPPs)

  7. Integrated logistic support concept in the design of nuclear power plants

    International Nuclear Information System (INIS)

    Martin-Onraet, M.; Degrave, C.; Meuwisse, C.

    1996-01-01

    Considering its plant operating experience, the analysis of foreign practice and the development of new design approaches and tools, Electricite de France (EDF) is convinced that it is possible to improve new plant design, operation and maintenance without increasing too much investment costs. To remain competitive it is necessary to maintain the kWh production cost of the future unit at a level close to those of the latest unit under construction (N4 series), while raising the Safety level. To minimize the kWh cost EDF has decided to implement the CIDEM project (French acronym for Design Integrating Availability, Operating Experience and Maintenance), an analytic and systematic process for studying new projects, aiming at a design optimization including investment, maintenance, availability and radiation exposure objectives. This approach aims at a single goal: to minimize the kWh production cost incorporating investment operation and fuel cost, based on experience from French and foreign units. This process, already widely practiced in other industries or services (aerospace, defense, ...), uses concepts known by the acronyms RAM (Reliability, Availability, Maintainability) RCM (Reliability, Centered Maintenance) and ILS (Integrated Logistic Support). The first CIDEM application is centered on the future French nuclear unit construction program, known as the REP 2000 program but the approach could be applied to other Reactor type or fossil-fired units in particular for its methodological aspect. The purpose of this paper is to introduce the EDF ILS concept

  8. Eurasia: The Rivalry of Global Integration Projects

    Directory of Open Access Journals (Sweden)

    Olesia Kobenko

    2016-05-01

    Full Text Available The article reveals the Eurasian integration projects as major drivers of world globalization. Eurasian regionalism seems to be gaining attention in the scientific literature. Under the current political circumstance many regions are accelerating integration and many countries are opting for regional associations as a mechanism to help them overcome the global recession. Moreover, the global political leaders , some developed countries - the U.S., China, and the European Union (EU are interested to set up regional economic blocs such as Eurasian Economic Union (The EEU, the China's project 'One Belt One Road', the U.S's projects - The Trans-Pacific Partnership (TPP and The Transatlantic Trade and Investment Partnership (TTIP. The goal of this paper is to introduce a number of integration initiatives and to analyze the current strategies of Eurasian regionalism.

  9. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    Kan, T.

    1998-01-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  10. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...... and maintenance require knowledge bases which can capture the interactions between the two plant activities. As an example, taking out a component or a subsystem for maintenance during operation will require a knowledge base representing the interactions between plant structure, functions, operating states...... and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural information...

  11. Integration of A Solid Oxide Fuel Cell into A 10 MW Gas Turbine Power Plant

    Directory of Open Access Journals (Sweden)

    Denver F. Cheddie

    2010-04-01

    Full Text Available Power generation using gas turbine power plants operating on the Brayton cycle suffers from low efficiencies. In this work, a solid oxide fuel cell (SOFC is proposed for integration into a 10 MW gas turbine power plant, operating at 30% efficiency. The SOFC system utilizes four heat exchangers for heat recovery from both the turbine outlet and the fuel cell outlet to ensure a sufficiently high SOFC temperature. The power output of the hybrid plant is 37 MW at 66.2% efficiency. A thermo-economic model predicts a payback period of less than four years, based on future projected SOFC cost estimates.

  12. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  13. Low NOx Fuel Flexible Combustor Integration Project Overview

    Science.gov (United States)

    Walton, Joanne C.; Chang, Clarence T.; Lee, Chi-Ming; Kramer, Stephen

    2015-01-01

    The Integrated Technology Demonstration (ITD) 40A Low NOx Fuel Flexible Combustor Integration development is being conducted as part of the NASA Environmentally Responsible Aviation (ERA) Project. Phase 2 of this effort began in 2012 and will end in 2015. This document describes the ERA goals, how the fuel flexible combustor integration development fulfills the ERA combustor goals, and outlines the work to be conducted during project execution.

  14. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  15. FUNCTION OF PHLOEM-BORNE INFORMATION MACROMOLECULES IN INTEGRATING PLANT GROWTH & DEVELOPMENT

    Energy Technology Data Exchange (ETDEWEB)

    William J. Lucas

    2012-11-12

    Studies on higher plants have revealed the operation of cell-to-cell and long-distance communication networks that mediate the transport of information macromolecules, such as proteins and RNA. Based on the findings from this DOE-funded project and results from other groups, it is now well established that the enucleate sieve tube system of the angiosperms contains a complex set of proteins including RNA binding proteins as well as a unique population of RNA molecules, comprised of both mRNA and small RNA species. Hetero-grafting experiments demonstrated that delivery of such RNA molecules, into the scion, is highly correlated with changes in developmental phenotypes. Furthermore, over the course of this project, our studies showed that plasmodesmata and the phloem are intimately involved in the local and systemic spread of sequence-specific signals that underlie gene silencing in plants. Major advances were also made in elucidating the underlying mechanisms that operate to mediate the selective entry and exit of proteins and RNA into and out of the phloem translocation stream. Our pioneering studies identified the first plant protein with the capacity to both bind specifically to small RNA molecules (si-RNA) and mediate in the cell-to-cell movement of such siRNA. Importantly, studies conducted with support from this DOE program also yielded a detailed characterization of the first phloem-mobile RNP complex isolated from pumpkin, namely the CmRBP50-RNP complex. This RNP complex was shown to bind, in a sequence-specific manner, to a set of transcripts encoding for transcription factors. The remarkable stability of this CmRBP50-RNP complex allows for long-distance delivery of bound transcripts from mature leaves into developing tissues and organs. Knowledge gained from this project can be used to exert control over the long-distance signaling networks used by plants to integrate their physiological and developmental programs at a whole plant level. Eventually, this

  16. Prediction of irradiation damage effects by multi-scale modelling: EURATOM 3 Framework integrated project perfect

    International Nuclear Information System (INIS)

    Massoud, J.P.; Bugat, St.; Marini, B.; Lidbury, D.; Van Dyck, St.; Debarberis, L.

    2008-01-01

    Full text of publication follows. In nuclear PWRs, materials undergo degradation due to severe irradiation conditions that may limit their operational life. Utilities operating these reactors must quantify the aging and the potential degradations of reactor pressure vessels and also of internal structures to ensure safe and reliable plant operation. The EURATOM 6. Framework Integrated Project PERFECT (Prediction of Irradiation Damage Effects in Reactor Components) addresses irradiation damage in RPV materials and components by multi-scale modelling. This state-of-the-art approach offers potential advantages over the conventional empirical methods used in current practice of nuclear plant lifetime management. Launched in January 2004, this 48-month project is focusing on two main components of nuclear power plants which are subject to irradiation damage: the ferritic steel reactor pressure vessel and the austenitic steel internals. This project is also an opportunity to integrate the fragmented research and experience that currently exists within Europe in the field of numerical simulation of radiation damage and creates the links with international organisations involved in similar projects throughout the world. Continuous progress in the physical understanding of the phenomena involved in irradiation damage and continuous progress in computer sciences make possible the development of multi-scale numerical tools able to simulate the effects of irradiation on materials microstructure. The consequences of irradiation on mechanical and corrosion properties of materials are also tentatively modelled using such multi-scale modelling. But it requires to develop different mechanistic models at different levels of physics and engineering and to extend the state of knowledge in several scientific fields. And the links between these different kinds of models are particularly delicate to deal with and need specific works. Practically the main objective of PERFECT is to build

  17. Cancellation of the Kaiseraugst nuclear power plant project

    International Nuclear Information System (INIS)

    Blocher, C.; Schoenenberger, J.; Stucky, G.

    1988-01-01

    The nuclear power plant project at Kaiseraugst has been worked on for over 20 years. In 1985 the Swiss Parliament decided to license the plant. The cost of the work to date is about 1.2 x10 6 Swiss Franks. Continuation of the project is only sensible if it can be realized within a foreseeable space of time. It is probable that the discussions concerning future energy, environment and safety will continue for a long time. If this is clear that the Kaiseraugst project will not be realized during the next five to ten years for social, civic and political reasons. A continuation of the project is not justifiable. Kernkraftwerk Kaiseraugst AG must be adequately compensated. A motion has been presented to Parliament which charges the Government to negotiate with Kernkraftwerk Kaiseraugst AG for cancellation of the project

  18. Suitable Days for Plant Growth Disappear under Projected Climate Change: Potential Human and Biotic Vulnerability.

    Directory of Open Access Journals (Sweden)

    Camilo Mora

    2015-06-01

    Full Text Available Ongoing climate change can alter conditions for plant growth, in turn affecting ecological and social systems. While there have been considerable advances in understanding the physical aspects of climate change, comprehensive analyses integrating climate, biological, and social sciences are less common. Here we use climate projections under alternative mitigation scenarios to show how changes in environmental variables that limit plant growth could impact ecosystems and people. We show that although the global mean number of days above freezing will increase by up to 7% by 2100 under "business as usual" (representative concentration pathway [RCP] 8.5, suitable growing days will actually decrease globally by up to 11% when other climatic variables that limit plant growth are considered (i.e., temperature, water availability, and solar radiation. Areas in Russia, China, and Canada are projected to gain suitable plant growing days, but the rest of the world will experience losses. Notably, tropical areas could lose up to 200 suitable plant growing days per year. These changes will impact most of the world's terrestrial ecosystems, potentially triggering climate feedbacks. Human populations will also be affected, with up to ~2,100 million of the poorest people in the world (~30% of the world's population highly vulnerable to changes in the supply of plant-related goods and services. These impacts will be spatially variable, indicating regions where adaptations will be necessary. Changes in suitable plant growing days are projected to be less severe under strong and moderate mitigation scenarios (i.e., RCP 2.6 and RCP 4.5, underscoring the importance of reducing emissions to avoid such disproportionate impacts on ecosystems and people.

  19. A comparison of electric vehicle integration projects

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Garcia-Valle, Rodrigo; Kempton, Willett

    2012-01-01

    .g. utilization of electric vehicles for ancillary services. To arrive at standardized solutions, it is helpful to analyze the market integration and utilization concepts, architectures and technologies used in a set of state-of-the art electric vehicle demonstration projects. The goal of this paper......It is widely agreed that an intelligent integration of electric vehicles can yield benefits for electric vehicle owner, power grid, and the society as a whole. Numerous electric vehicle utilization concepts have been investigated ranging from the simple e.g. delayed charging to the more advanced e...... is to highlight different approaches to electric vehicle integration in three such projects and describe the underlying technical components which should be harmonized to support interoperability and a broad set of utilization concepts. The projects investigated are the American University of Delaware's V2G...

  20. Integrated color face graphs for plant accident display

    International Nuclear Information System (INIS)

    Hara, Fumio

    1987-01-01

    This paper presents an integrated man-machine interface that uses cartoon-like colored graphs in the form of faces, that, through different facial expressions, display a plant condition. This is done by drawing the face on a CRT by nonlinearly transforming 31 variables and coloring the face. This integrated color graphics technique is applied to display the progess of events in the Three Mile Island nuclear power plant accident. Human visual perceptive characteristics are investigated in relation to the perception of the plant accident process, the naturality in face color change, and the consistency between facial expressions and colors. This paper concludes that colors used in an integrated color face graphs must be completely consistent with emotional feelings perceived from the colors. (author)

  1. Optimizing integrated reference cases in the OCTAVIUS project

    NARCIS (Netherlands)

    Kvamsdal, H.M.; Ehlers, S.; Kather, A.; Khakharia, P.M.; Nienoord, M.; Fosbøl, P.L.

    2016-01-01

    Adding a carbon capture plant to a power plant reduces the efficiency of said power plant. In order to keep this drop in efficiency as small as possible, several optimisation studies are performed in the OCTAVIUS project. Based on the work of the European Benchmarking Task Force-EBTF within the

  2. Project organization for automating an industrial power plant

    International Nuclear Information System (INIS)

    Williams, D.R.; McCowen, R.R.

    1988-01-01

    This paper reports on the controls for three boilers and three turbine generators at the power plant at the John Deere Waterloo Works that have been retrofit with a microprocessor based monitoring, control, and optimization system. The factors driving the project in the 15 mW, 500,000 lb/hr, 35 year old plant were reduced electricity costs due to peak shaving, energy conservation, labor savings, reduced maintenance costs and improved reliability. A turnkey design/build arrangement was sought after a preliminary study indicated an attractive return on investment Control system vendors and design/build contractors were evaluated using a group decision making method. A design/build contractor was chosen to do an in-depth study and write specifications for the control system were negotiated with the contractor The project was managed by the Power Plant and Energy Management Department, rather than by the staff department normally responsible for capital projects

  3. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists the management of organizations responsible for Nuclear Power Plant Projects with significant delays with respect to the originally scheduled commercial operation. Several Member States have Nuclear Power Plant Projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules shows large variations due to several issues, including financial, economic and public opinion factors. Solving the special difficulties related with a delayed NPP project is problematic and dependent on the particular country situation. However it is not regarded as an isolated national problem but as a significant issue with a number of difficulties shared by several Member States. The IAEA collects information and supports the management of delayed NPP projects by identifying main common issues, gathering available experience and addressing specific needs. On this background the IAEA is in the position to provide unique impartial assistance based upon best international practices. This enables Member States to maintain readiness for resuming the project construction when the conditions permit and to strengthen management's abilities for the completion of the project. The IAEA's service is tailored to the needs and requirements of the requesting organization, implemented on-site by international experts and addresses areas such as project control measures, human resources, updating to technological and regulatory requirements, project data, nuclear safety review, physical protection and nuclear security and preparation to resume project construction and operation

  4. 1-MWp electrical photovoltaic plant (EPHOP - project)

    International Nuclear Information System (INIS)

    Vitanov, P.; Toneva, A.; Petkanchin, L.; Ivancheva, J.; Neshev, S.

    2000-01-01

    The presented project concerns the realization of a grid connected 1-MW p pilot photovoltaic plant on the territory of Bulgaria.The purpose of the project is to demonstrate and prove solar energy advantages. A special attention will be paid to the possibility the generated electricity to join the national electric network. The site selection according to the meteorological conditions as well as general aspects of the project are discussed

  5. An integrated reliability management system for nuclear power plants

    International Nuclear Information System (INIS)

    Kimura, T.; Shimokawa, H.; Matsushima, H.

    1998-01-01

    The responsibility in the nuclear field of the Government, utilities and manufactures has increased in the past years due to the need of stable operation and great reliability of nuclear power plants. The need to improve the reliability is not only for the new plants but also for those now running. So, several measures have been taken to improve reliability. In particular, the plant manufactures have developed a reliability management system for each phase (planning, construction, maintenance and operation) and these have been integrated as a unified system. This integrated reliability management system for nuclear power plants contains information about plant performance, failures and incidents which have occurred in the plants. (author)

  6. Integrative Bioethics: A Conceptually Inconsistent Project.

    Science.gov (United States)

    Ivanković, Viktor; Savić, Lovro

    2016-06-01

    This article provides a critical evaluation of the central components of Integrative Bioethics, a project aiming at a bioethical framework reconceptualization. Its proponents claim that this new system of thought has developed a better bioethical methodology than mainstream Western bioethics, a claim that we criticize here. We deal especially with the buzz words of Integrative Bioethics - pluriperspectivism, integrativity, orientational knowledge, as well as with its underlying theory of moral truth. The first part of the paper looks at what the claims of a superior methodology consist in. The second reveals pluriperspectivism and integrativity to be underdeveloped, hazy terms, but which seem to be underpinned by two theses - the incommensurability and the inclusiveness theses. These theses we critically scrutinize. We then consider strategies the project's proponents might apply to curb these theses in order to acquire minimal consistency for their framework. This part of the article also deals with the conception of moral truth that drives the theory, a position equally burdened with inconsistencies. In the last part of the article, we observe the concept of orientational knowledge, and develop two interpretations of its possible meaning. We claim that, following the first interpretation, Integrative Bioethics is completely descriptive, in which case it is informative and important, but hardly bioethics; if it is normative, following the second interpretation, it is bioethics as we already know it, but merely clad in rhetorical embellishments. We conclude that there is nothing new about this project, and that its inconsistencies are reason enough for its abandonment. © 2015 John Wiley & Sons Ltd.

  7. Strategically oriented project management of the decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Kemmeter, Sascha; Woempener, Andreas

    2013-01-01

    Due to the politically induced change of the energy sector in Germany, the operators of nuclear power plants had to react and to deal with completely new conditions concerning the decommissioning of their plants on short notice. Therefore the operators have to devise new strategies for controlling their decommissioning and dismantling projects in a short amount of time and most often similarly for several plants. Two fundamental procedures are possible for the successful controlling of these dismantling projects: a centralized or a decentralized management organization. How these project control processes can be realized in an optimal way, is, next to other economic specifications of the dismantling of nuclear power plants, the topic of a new research project of the Chair of Management Accounting at the University Duisburg-Essen. In that process, results and experiences from other research and practical projects concerning general large-scale projects are being used. Selected findings have been compiled and are being discussed in this paper. (orig.)

  8. Integrating Waste Heat from CO2 Removal and Coal-Fired Flue Gas to Increase Plant Efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Irvin, Nick [Southern Company Services, Inc., Birmingham, AL (United States); Kowalczyk, Joseph [Southern Company Services, Inc., Birmingham, AL (United States)

    2017-04-01

    In project DE-FE0007525, Southern Company Services demonstrated heat integration methods for the capture and sequestration of carbon dioxide produced from pulverized coal combustion. A waste heat recovery technology (termed High Efficiency System) from Mitsubishi Heavy Industries America was integrated into an existing 25-MW amine-based CO2 capture process (Kansai Mitsubishi Carbon Dioxide Recovery Process®1) at Southern Company’s Plant Barry to evaluate improvements in the energy performance of the pulverized coal plant and CO2 capture process. The heat integration system consists of two primary pieces of equipment: (1) the CO2 Cooler which uses product CO2 gas from the capture process to heat boiler condensate, and (2) the Flue Gas Cooler which uses air heater outlet flue gas to further heat boiler condensate. Both pieces of equipment were included in the pilot system. The pilot CO2 Cooler used waste heat from the 25-MW CO2 capture plant (but not always from product CO2 gas, as intended). The pilot Flue Gas Cooler used heat from a slipstream of flue gas taken from downstream of Plant Barry’s air heater. The pilot also included a 0.25-MW electrostatic precipitator. The 25-MW High Efficiency System operated for approximately six weeks over a four month time period in conjunction with the 25-MW CO2 capture facility at Plant Barry. Results from the program were used to evaluate the technical and economic feasibility of full-scale implementation of this technology. The test program quantified energy efficiency improvements to a host power plant that could be realized due to the High Efficiency System. Through the execution of this project, the team verified the integrated operation of the High Efficiency System and Kansai Mitsubishi Carbon Dioxide Recovery Process®. The ancillary benefits of the High Efficiency System were also quantified, including reduced water consumption

  9. The integrated nitrous oxide and methane grassland project

    Energy Technology Data Exchange (ETDEWEB)

    Leffelaar, P.A.; Langeveld, C.A.; Hofman, J.E.; Segers, R.; Van den Pol-van Dasselaar, A.; Goudriaan, J.; Rabbinge, R.; Oenema, O. [Department of Theoretical Production Ecology, Wageningen Agricultural University, Wageningen (Netherlands)

    2000-07-01

    The integrated nitrous oxide (N{sub 2}O) and methane (CH{sub 4}) grassland project aims to estimate and explain emissions of these greenhouse gases from two ecosystems, namely drained agricultural peat soil under grass at the experimental farm Zegveld and undrained peat in the nature preserve Nieuwkoopse Plassen, both Netherlands. Peat soils were chosen because of their expected considerable contribution to the greenhouse gas budget considering the prevailing wet and partial anaerobic conditions. The emission dynamics of these ecosystems are considered representatives of large peat areas because the underlying processes are rather general and driven by variables like organic matter characteristics, water and nutrient conditions and type of vegetation. The research approach comprises measurements and modelling at different integration levels relating to the microbiology of the production and consumption of N{sub 2}O and CH{sub 4} (laboratory studies), their movement through peat soil (rhizolab and field studies), and the resulting fluxes (field studies). Typical emissions from drained soil were 15-40 kg ha{sup -1} y{sup -1} N{sub 2}O and virtually zero for CH{sub 4}. The undrained soil in the nature preserve emitted 100-280 kg ha{sup -1} y{sup -1} CH{sub 4}, and probably little N{sub 2}O. The process knowledge, collected and partly integrated in the models, helps to explain these data. For example, the low methane emission from drained peat can more coherently be understood and extrapolated because: (1) upper soil layers are aerobic, thus limiting methane production and stimulating methane oxidation, (2) absence of aerenchymatous roots of wetland plants that connect deeper anaerobic soil layers where methane is produced to the atmosphere and supply labile carbon, (3) a low methane production potential in deep layers due to the low decomposability of organic matter, and (4) long anaerobic periods needed in the topsoil to develop a methane production potential. This

  10. STYLE - A European project on structural integrity: Progress of the work after 2 Years

    International Nuclear Information System (INIS)

    Heussner, Stefan; Nicak, Tomas; Keim, Elisabeth

    2012-01-01

    The purpose of this paper is to present the progress of the work on the EURATOM project STYLE (Structural integrity for lifetime management - non-RPV components). The project focuses on the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management. The 4-years project started in January 2010 and is now in its third year. Within STYLE realistic failure models for some of the key components will be identified. The range of assessment tools considered will include those for assessment of component failure by advanced fracture mechanics analyses validated on small and large scale experiments, quantification of weld residual stresses by numerical analysis and by measurements, stress corrosion crack initiation and growth effects and assessment of RCPB components (excluding the reactor pressure vessel) under dynamic and seismic loading. Based on theoretical and experimental results, performance assessment and further development of simplified engineering assessment methods (EAM) will be carried out considering both deterministic and probabilistic approaches. Integrity assessment case studies and large scale demonstration experiments will be performed on Mock-ups of safety relevant components. These will include a repair weld in an aged butt-welded austenitic pipe, a dissimilar narrow gap TIG weld (following the EPR design) and a cladded ferritic pipe. Moreover, experiments on specimens and feature test pieces will be carried out to support the large scale Mock-up analyses. The end product of the project ('STYLE TOOLS') will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project is interacting with the European Network of Excellence NUGENIA (former NULIFE). (author)

  11. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  12. Data integration aids understanding of butterfly–host plant networks

    Science.gov (United States)

    Muto-Fujita, Ai; Takemoto, Kazuhiro; Kanaya, Shigehiko; Nakazato, Takeru; Tokimatsu, Toshiaki; Matsumoto, Natsushi; Kono, Mayo; Chubachi, Yuko; Ozaki, Katsuhisa; Kotera, Masaaki

    2017-01-01

    Although host-plant selection is a central topic in ecology, its general underpinnings are poorly understood. Here, we performed a case study focusing on the publicly available data on Japanese butterflies. A combined statistical analysis of plant–herbivore relationships and taxonomy revealed that some butterfly subfamilies in different families feed on the same plant families, and the occurrence of this phenomenon more than just by chance, thus indicating the independent acquisition of adaptive phenotypes to the same hosts. We consequently integrated plant–herbivore and plant–compound relationship data and conducted a statistical analysis to identify compounds unique to host plants of specific butterfly families. Some of the identified plant compounds are known to attract certain butterfly groups while repelling others. The additional incorporation of insect–compound relationship data revealed potential metabolic processes that are related to host plant selection. Our results demonstrate that data integration enables the computational detection of compounds putatively involved in particular interspecies interactions and that further data enrichment and integration of genomic and transcriptomic data facilitates the unveiling of the molecular mechanisms involved in host plant selection. PMID:28262809

  13. Experiences with the technical cooperation project TC MEX 04/53. Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant. Management program of the plant life (PLIM)

    International Nuclear Information System (INIS)

    Arganis J, C.R.; Aguilar T, J.A.; Guevara M, A.; Garcia M, C.; Martinez G, R.R.; Griz C, M.M.; Sanchez M, M.A.; Diaz O, R.C.

    2006-01-01

    In the biennium 2005-2006 the project of technical cooperation with the International Atomic Energy Agency OIEA TC MEX 04/53 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Plant life handling program (PLIM)' was approved, which has as objective the one to begin the actions to apply the methodology of Handling of life of Plant (PLIM) in the Unit I (Ul) of the Laguna Verde Nucleo electric Central (CNLV), in order to obtain the Renovation of License (LR), in a long term (2020). To apply this methodology 5 systems they were selected, structures or components (SEC) to carry out the handling programs of the one aging (AMP), and PLIM which are: The encircling of the reactor core (Core Shroud), the pressure vessel of the reactor (Reactor Pressure Vessel), the one primary container (Primary Containment), the system of feeding water (Reactor Feed Water) and cables, which were not in this work to be of another nature. The report presents the more important aspects considered in these systems for their programs of AMP and PLIM, as like a revision of those selection processes and evaluation (screening and scoping) for the application of PLIM in the systems of the Ul of the CNLV. (Author)

  14. Control room modernization at Finnish nuclear power plants - Two projects compared

    International Nuclear Information System (INIS)

    Laarni, J.; Norros, L.

    2006-01-01

    The modernization of automation systems and human-machine interfaces is a current issue at both of the two nuclear power plants (i.e., Fortum's Loviisa plant and TVO's Olkiluoto plant) in Finland. Since the plants have been launched in the 1970's or 1980's, technology is in part old-fashioned and needs to be renewed. At Olkiluoto upgrades of the turbine operator systems have already been conducted; at Loviisa the first phase of the modernization project has just started. Basically, there is a question of the complete digitalization of the information streams at the two plants, and transition from a conventional hard-wired or hybrid control room to a screen-based one. The new human-machine interfaces will comprise new technology, such as PC workstations, soft control, touch screens and large-screen overall displays. The modernization of human-system interfaces is carried out in a stepwise manner at both plants. At both plants the main driver has not been the need to renew the user interfaces of the control room, but the need to upgrade the automation systems. In part because of this, there is a lack of a systematic top-down approach in which different aspects of human factors (HF) engineering are considered in relationship to higher level goals. Our aim here is to give an overview description of the control room modernization projects at the two plants and provide a preliminary evaluation of their progress to date. The projects are also compared, for example, in terms of duration, scope and phasing, and who is responsible for the realization of the project. In addition, we also compare experiences from the Finnish projects to experiences from similar projects abroad. The main part of the data used in this study is based on designers' and project members' interviews. (authors)

  15. Feasibility study of Pridneprovskaya Thermal Power Plant reconstruction project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  16. Plant Clonal Integration Mediates the Horizontal Redistribution of Soil Resources, Benefiting Neighboring Plants.

    Science.gov (United States)

    Ye, Xue-Hua; Zhang, Ya-Lin; Liu, Zhi-Lan; Gao, Shu-Qin; Song, Yao-Bin; Liu, Feng-Hong; Dong, Ming

    2016-01-01

    Resources such as water taken up by plants can be released into soils through hydraulic redistribution and can also be translocated by clonal integration within a plant clonal network. We hypothesized that the resources from one (donor) microsite could be translocated within a clonal network, released into different (recipient) microsites and subsequently used by neighbor plants in the recipient microsite. To test these hypotheses, we conducted two experiments in which connected and disconnected ramet pairs of Potentilla anserina were grown under both homogeneous and heterogeneous water regimes, with seedlings of Artemisia ordosica as neighbors. The isotopes [(15)N] and deuterium were used to trace the translocation of nitrogen and water, respectively, within the clonal network. The water and nitrogen taken up by P. anserina ramets in the donor microsite were translocated into the connected ramets in the recipient microsites. Most notably, portions of the translocated water and nitrogen were released into the recipient microsite and were used by the neighboring A. ordosica, which increased growth of the neighboring A. ordosica significantly. Therefore, our hypotheses were supported, and plant clonal integration mediated the horizontal hydraulic redistribution of resources, thus benefiting neighboring plants. Such a plant clonal integration-mediated resource redistribution in horizontal space may have substantial effects on the interspecific relations and composition of the community and consequently on ecosystem processes.

  17. Plant clonal integration mediates the horizontal redistribution of soil resources, benefiting neighbouring plants

    Directory of Open Access Journals (Sweden)

    Xuehua eYe

    2016-02-01

    Full Text Available Resources such as water taken up by plants can be released into soils through hydraulic redistribution and can also be translocated by clonal integration within a plant clonal network. We hypothesized that the resources from one (donor microsite could be translocated within a clonal network, released into different (recipient microsites and subsequently used by neighbour plants in the recipient microsite. To test these hypotheses, we conducted two experiments in which connected and disconnected ramet pairs of Potentilla anserina were grown under both homogeneous and heterogeneous water regimes, with seedlings of Artemisia ordosica as neighbours. The isotopes [15N] and deuterium were used to trace the translocation of nitrogen and water, respectively, within the clonal network. The water and nitrogen taken up by P. anserina ramets in the donor microsite were translocated into the connected ramets in the recipient microsites. Most notably, portions of the translocated water and nitrogen were released into the recipient microsite and were used by the neighbouring A. ordosica, which increased growth of the neighbouring A. ordosica significantly. Therefore, our hypotheses were supported, and plant clonal integration mediated the horizontal hydraulic redistribution of resources, thus benefiting neighbouring plants. Such a plant clonal integration-mediated resource redistribution in horizontal space may have substantial effects on the interspecific relations and composition of the community and consequently on ecosystem processes.

  18. Application of integrated computer-aided engineering for design, construction and operation of nuclear power plant: practice and prospects

    International Nuclear Information System (INIS)

    Min, K.S.; Lee, B.H.

    1988-01-01

    Computer-aided-engineering (CAE) is an essential tool for modern nuclear power plant engineering. It greatly varies in definition, application, and technology from project to project and company to company. Despite the fast growing technologies and applications of CAE, its complexity and variety have thrown another puzzle to management of a nuclear project. Without due consideration of an integrated CAE system in early planning stage, the overall efficiency of a nuclear project would slow down due to the inefficiency in data flow. In this application are discussed under the Korea Power engineering Company philosophy in CAE approach

  19. Economic evaluation of the integrated SMART desalination plant

    International Nuclear Information System (INIS)

    Hwang, Young Dong; Lee, Man Kye; Yeo, Ji Won; Kim, Hee Chul; Chang, Moon Hee

    2001-04-01

    In this study, an economic evaluation methodology of the integrated SMART desalination plant was established and the economic evaluation of SMART was performed. The plant economics was evaluated with electricity generation costs calculated using approximate estimates of SMART cost data and the result was compared with the result calculated using the SMART design data and estimated bulk materials. In addition, a series of sensitivity studies on the power generation cost was performed for the main economic parameters of SMART Power credit method was used for the economic analysis of the integrated SMART desalination plant. Power credit method is a widely used economic analysis method for the cogeneration plant when the major portion of the energy is used for the electricity generation. In the case of using SMART fot power generation only, the result shows that the electricity generation cost of SMART is higher than that of the alternative power options. However, it can be competitive with the other power options in the limited cases, especially with the gas fired combined plant. In addition, an economic analysis of the integrated SMART desalination plant coupled with MED was performed. The calculated water production cost is in the range of 0.56 approx. 0.88($/m 3 ) for the plant availability of 80% or higher, which is close to the study results presented by the various other countries. This indicates that SMART can be considered as a competitive choice for desalination among various alternative energy sources

  20. Economic evaluation of the integrated SMART desalination plant

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Young Dong; Lee, Man Kye; Yeo, Ji Won; Kim, Hee Chul; Chang, Moon Hee

    2001-04-01

    In this study, an economic evaluation methodology of the integrated SMART desalination plant was established and the economic evaluation of SMART was performed. The plant economics was evaluated with electricity generation costs calculated using approximate estimates of SMART cost data and the result was compared with the result calculated using the SMART design data and estimated bulk materials. In addition, a series of sensitivity studies on the power generation cost was performed for the main economic parameters of SMART Power credit method was used for the economic analysis of the integrated SMART desalination plant. Power credit method is a widely used economic analysis method for the cogeneration plant when the major portion of the energy is used for the electricity generation. In the case of using SMART fot power generation only, the result shows that the electricity generation cost of SMART is higher than that of the alternative power options. However, it can be competitive with the other power options in the limited cases, especially with the gas fired combined plant. In addition, an economic analysis of the integrated SMART desalination plant coupled with MED was performed. The calculated water production cost is in the range of 0.56 approx. 0.88($/m{sup 3}) for the plant availability of 80% or higher, which is close to the study results presented by the various other countries. This indicates that SMART can be considered as a competitive choice for desalination among various alternative energy sources.

  1. Projection operator and propagator for an arbitrary integral spin

    CERN Document Server

    Huang Shi Zhong; Wu Ning; Zheng Zhi Peng

    2002-01-01

    Based on the solution of the Bargmann-Wigner equation for an arbitrary integral spin, a direct derivation of the projection operator and propagator for an arbitrary integral spin is presented. The explicit form for the spin projection operators constructed by Behrends and Fronsdal is confirmed. The commutation rules and a general expression for the Feynman propagator for a free particle of arbitrary integral spin are deduced

  2. Feasibility study on Bobovdol thermal power plant upgrading project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons of fuel oil equivalent. In addition, the reduction rate of global warming gas emission is 57.75%, and the cumulative reduction quantity in 41 years is 105.18 million tons. (NEDO)

  3. A Policy Guide on Integrated Care (PGIC: Lessons Learned from EU Project INTEGRATE and Beyond

    Directory of Open Access Journals (Sweden)

    Liesbeth Borgermans

    2017-09-01

    Full Text Available Efforts are underway in many European countries to channel efforts into creating improved integrated health and social care services. But most countries lack a strategic plan that is sustainable over time, and that reflects a comprehensive systems perspective. The Policy Guide on Integrated Care (PGIC as presented in this paper resulted from experiences with the EU Project INTEGRATE and our own work with healthcare reform for patients with chronic conditions at the national and international level. This project is one of the largest EU funded projects on Integrated Care, conducted over a four-year period (2012–2016 and included partners from nine European countries. Project Integrate aimed to gain insights into the leadership, management and delivery of integrated care to support European care systems to respond to the challenges of ageing populations and the rise of people living with long-term conditions. The objective of this paper is to describe the PGIC as both a tool and a reasoning flow that aims at supporting policy makers at the national and international level with the development and implementation of integrated care. Any Policy Guide on Integrated should build upon three building blocks, being a mission, vision and a strategy that aim at capturing the large amount of factors that directly or indirectly influence the successful development of integrated care.

  4. A Policy Guide on Integrated Care (PGIC): Lessons Learned from EU Project INTEGRATE and Beyond.

    Science.gov (United States)

    Borgermans, Liesbeth; Devroey, Dirk

    2017-09-25

    Efforts are underway in many European countries to channel efforts into creating improved integrated health and social care services. But most countries lack a strategic plan that is sustainable over time, and that reflects a comprehensive systems perspective. The Policy Guide on Integrated Care (PGIC) as presented in this paper resulted from experiences with the EU Project INTEGRATE and our own work with healthcare reform for patients with chronic conditions at the national and international level. This project is one of the largest EU funded projects on Integrated Care, conducted over a four-year period (2012-2016) and included partners from nine European countries. Project Integrate aimed to gain insights into the leadership, management and delivery of integrated care to support European care systems to respond to the challenges of ageing populations and the rise of people living with long-term conditions. The objective of this paper is to describe the PGIC as both a tool and a reasoning flow that aims at supporting policy makers at the national and international level with the development and implementation of integrated care. Any Policy Guide on Integrated should build upon three building blocks, being a mission, vision and a strategy that aim at capturing the large amount of factors that directly or indirectly influence the successful development of integrated care.

  5. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  6. Relay Feedback Analysis for Double Integral Plants

    Directory of Open Access Journals (Sweden)

    Zhen Ye

    2011-01-01

    Full Text Available Double integral plants under relay feedback are studied. Complete results on the uniqueness of solutions, existence, and stability of the limit cycles are established using the point transformation method. Analytical expressions are also given for determining the amplitude and period of a limit cycle from the plant parameters.

  7. Nuclear plant engineering work and integrated management system

    International Nuclear Information System (INIS)

    Ohkubo, Y.; Obata, T.; Tanaka, K.

    1992-01-01

    The Application of computers to the design, engineering, manufacturing and construction works of nuclear power plants has greatly contributed to improvement of productivity and reliability in the nuclear power plants constructed by Mitsubishi Nuclear Group for more than ten years. However, in most cases, those systems have been developed separately and utilized independently in different computer software and hardware environments and have not been fully utilized to achieve high efficiency and reliability. In order to drastically increase the productivity and efficiency, development of NUclear power plant engineering Work and INtegrated manaGement System (NUWINGS) started in 1987 to unify and integrate various conventional and developing systems using the state-of-the-art computer technology. The NUWINGS is almost completed and is now applied to actual plant construction. (author)

  8. Angular integration and inter-projection correlation effects in CT reconstruction

    International Nuclear Information System (INIS)

    Crawford, C.R.; Pele, N.J.

    1987-01-01

    CT reconstruction algorithms require snap-shot projections of an object. In order to minimize scan times, CT scanners rotate continuously which, in turn, prevents the acquisition of snap-shot projections. Acquired projections are integrals over angular position and may be correlated inter-projection. This paper shows that angular integration and inter-projection correlation introduce a radially dependent degradation of the spatial resolution and cause the image noise to vary non-linearly with radial position

  9. Development of an integrated database management system to evaluate integrity of flawed components of nuclear power plant

    International Nuclear Information System (INIS)

    Mun, H. L.; Choi, S. N.; Jang, K. S.; Hong, S. Y.; Choi, J. B.; Kim, Y. J.

    2001-01-01

    The object of this paper is to develop an NPP-IDBMS(Integrated DataBase Management System for Nuclear Power Plants) for evaluating the integrity of components of nuclear power plant using relational data model. This paper describes the relational data model, structure and development strategy for the proposed NPP-IDBMS. The NPP-IDBMS consists of database, database management system and interface part. The database part consists of plant, shape, operating condition, material properties and stress database, which are required for the integrity evaluation of each component in nuclear power plants. For the development of stress database, an extensive finite element analysis was performed for various components considering operational transients. The developed NPP-IDBMS will provide efficient and accurate way to evaluate the integrity of flawed components

  10. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    Energy is essential for national development. Nearly every aspect of development - from reducing poverty and raising living standards to improving health care, industrial and agricultural productivity - requires reliable access to modern energy resources. States may have different reasons for considering starting a nuclear power project to achieve their national energy needs, such as: lack of available indigenous energy resources, the desire to reduce dependence upon imported energy, the need to increase the diversity of energy resources and/or mitigation of carbon emission increases. The start of a nuclear power plant project involves several complex and interrelated activities with long duration. Experience shows that the time between the initial policy decision by a State to consider nuclear power up to the start of operation of its first nuclear power plant is about 10 to 15 years and that before specific project management can proceed, several key infrastructure issues have to be in place. The proper management of the wide scope of activities to be planned and implemented during this period represents a major challenge for the involved governmental, utility, regulatory, supplier and other supportive organizations. The main focus is to ensure that the project is implemented successfully from a commercial point of view while remaining in accordance with the appropriate engineering and quality requirements, safety standards and security guides. This publication is aimed at providing guidance on the practical management of a first nuclear power project in a country. There are many other issues, related to ensuring that the infrastructure in the country has been prepared adequately to ensure that the project will be able to be completed, that are only briefly addressed in this publication. The construction of the first nuclear power plant is a major undertaking for any country developing a nuclear power programme. Worldwide experience gained in the last 50 years

  11. Successful integration of fast track projects into turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Williams, J. Patrick; Loureiro, Ramon C. [KBC Advanced Technologies, Surrey (United Kingdom)

    2012-07-01

    Fast track projects can provide quick wins and competitive advantage. However, in most cases the implementation of these projects requires a shutdown for installing the necessary tie-ins or integration into an upcoming turnaround (TA). Depending on the nature of the project and complexity of the TA, the integration can be seamless or result in cost or duration overruns and safety incidents. The risk of such overruns and safety incidents increases with the amount of project work to be integrated into the operations, maintenance and inspection schedules to be executed during the TA. The risk further increases with TA size and other factors. If not planned and scheduled properly and in a timely fashion, capital projects, in particular fast track projects trying to take advantage of an upcoming TA, can severely impact both TA performance, and the safety and reliability of the facility until the next opportunity for eliminating the defects introduced during the TA. Successful TAs are those delivered in a safe, on time, on budget manner, and with the quality standards needed for a leak-free start-up and a safe and reliable operation over the next run cycle. This paper discusses the key elements that are required to minimize the TA risks derived from the inclusion of fast track projects and how to establish the cut off criteria to either cancel or defer the project, or delay the TA in order to balance TA scope freeze and the case for compelling economics.(author)

  12. MIPS Arabidopsis thaliana Database (MAtDB): an integrated biological knowledge resource based on the first complete plant genome

    Science.gov (United States)

    Schoof, Heiko; Zaccaria, Paolo; Gundlach, Heidrun; Lemcke, Kai; Rudd, Stephen; Kolesov, Grigory; Arnold, Roland; Mewes, H. W.; Mayer, Klaus F. X.

    2002-01-01

    Arabidopsis thaliana is the first plant for which the complete genome has been sequenced and published. Annotation of complex eukaryotic genomes requires more than the assignment of genetic elements to the sequence. Besides completing the list of genes, we need to discover their cellular roles, their regulation and their interactions in order to understand the workings of the whole plant. The MIPS Arabidopsis thaliana Database (MAtDB; http://mips.gsf.de/proj/thal/db) started out as a repository for genome sequence data in the European Scientists Sequencing Arabidopsis (ESSA) project and the Arabidopsis Genome Initiative. Our aim is to transform MAtDB into an integrated biological knowledge resource by integrating diverse data, tools, query and visualization capabilities and by creating a comprehensive resource for Arabidopsis as a reference model for other species, including crop plants. PMID:11752263

  13. Integrated omics analysis of specialized metabolism in medicinal plants.

    Science.gov (United States)

    Rai, Amit; Saito, Kazuki; Yamazaki, Mami

    2017-05-01

    Medicinal plants are a rich source of highly diverse specialized metabolites with important pharmacological properties. Until recently, plant biologists were limited in their ability to explore the biosynthetic pathways of these metabolites, mainly due to the scarcity of plant genomics resources. However, recent advances in high-throughput large-scale analytical methods have enabled plant biologists to discover biosynthetic pathways for important plant-based medicinal metabolites. The reduced cost of generating omics datasets and the development of computational tools for their analysis and integration have led to the elucidation of biosynthetic pathways of several bioactive metabolites of plant origin. These discoveries have inspired synthetic biology approaches to develop microbial systems to produce bioactive metabolites originating from plants, an alternative sustainable source of medicinally important chemicals. Since the demand for medicinal compounds are increasing with the world's population, understanding the complete biosynthesis of specialized metabolites becomes important to identify or develop reliable sources in the future. Here, we review the contributions of major omics approaches and their integration to our understanding of the biosynthetic pathways of bioactive metabolites. We briefly discuss different approaches for integrating omics datasets to extract biologically relevant knowledge and the application of omics datasets in the construction and reconstruction of metabolic models. © 2017 The Authors The Plant Journal © 2017 John Wiley & Sons Ltd.

  14. Api Energia IGCC plant is fully integrated with refinery

    Energy Technology Data Exchange (ETDEWEB)

    Del Bravo, R. [api Energia, Rome (Italy); Trifilo, R. [ABB Sadelmi, Milan (Italy); Chiantore, P.V. [api anonima petroli Italiania Spa, Rome (Italy); Starace, F. [ABB Power Generation, Baden (Switzerland); O`Keefe, L.F. [Texico, White Plains (United States)

    1998-06-01

    The api Energia integrated gasification combined cycle (IGCC) plant being built at Falconara Marittima, on Italy`s Adriatic coast, is one of the three IGCC plants under construction in Italy following the liberalization of the electricity production sector. The plant will take 59.2 t/h of high sulphur heavy oil produced by the Falconara refinery, convert it to syngas and use the gas to generate 280 MW of electricity, plus steam and other gases for use in the refinery. The IGCC plant will be highly integrated into the refining process, with a large number of interchanges between the IGCC unit and the rest of the refinery. (author)

  15. Integrated technology projects for rural communities

    Energy Technology Data Exchange (ETDEWEB)

    Forestier-Walker, C O

    1982-10-01

    Integrated Technology Projects (ITP) are set up so that they interact concurrently in ways that are compatible with local cultures, religions, traditions, and life styles. This management approach can take into account the low productivity of arid and semi-arid regions by increasing water, power, and fertilizer inputs in ways that will integrate their supply with other activities and minimize costs. The author illustrates how integrated agricultural, water and sanitation, energy, and housing modules can accomplish this. 1 reference, 4 figures, 5 tables. (DCK)

  16. Demonstration project: Oxy-fuel combustion at Callide-A plant

    Energy Technology Data Exchange (ETDEWEB)

    Makino, Keiji; Misawa, Nobuhiro; Kiga, Takashi; Spero, Chris

    2007-07-01

    Oxy-fuel combustion is expected to be one of the promising systems on CO2 recovery from pulverized-coal power plant, and enable the CO2 to be captured in a more cost-effective manner compared to other CO2 recover process. An Australia-Japan consortium was established in 2004 specifically for the purpose of conducting a feasibility study on the application of oxy-fuel combustion to an existing pulverized-coal power plant that is Callide-A power plant No.4 unit at 30MWe owned by CS Energy in Australia. One of the important components in this study has been the recent comparative testing of three Australian coals under both oxy-fuel and air combustion conditions using the IHI combustion test facilities. The tests have yielded a number of important outcomes including a good comparison of normal air with oxy-fuel combustion, significant reduction in NOx mass emission rates under oxy-fuel combustion. On the basis of the feasibility study, the project under Australia-Japan consortium is now under way for applying oxy-fuel combustion to an existing plant by way of demonstration. In this project, a demonstration plant of oxy-fuel combustion will be completed by the end of 2008. This project aims at recovering CO2 from an actual power plant for storage. (auth)

  17. Conference on authorisation procedures and territorial integration of methanation projects

    International Nuclear Information System (INIS)

    Boettcher, Katharina; Furois, Timothee; Molinie, Lea; Fuseliez, Sabrina; Stolpp, Sebastian; Lavoue, Fannie; Grosse, Andreas; Charbeaux, Veronique; Chapelat, Nicolas; Merigout, Patricia; Stinner, Walter; Trommler, Marcus; Jacobi, H. Fabian; Mauky, E.; Weinrich, S.

    2014-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on the authorisation procedures and the territorial integration of methanation projects. In the framework of this French-German exchange of experience, participants exchanged views on the situation of methanation industry in both countries, on the legal framework of authorization procedures, and on the different local strategies for the integration of methanation facilities. A series of presentations deal with the use of digestates and put forward the differences between France and Germany in the use and valorization of methanation digestates. This document brings together the available presentations (slides) made during this event: 1 - Bioenergy in the energy system of the future - Policy framework, new biogas regulations in the EEG 2014 German law (Katharina Boettcher); 2 - The energy Transition for Green Growth law and its role for the French biogas (Timothee Furois); 3 - The 'EMAA' (Energy Methanation Autonomy Nitrogen) plan - Progress status (Lea Molinie); 4 - Biogas in France: current status and outlooks, structuration of a developing industry and its role in the energy transition (Sabrina Fuseliez); 5 - Biogas market in Germany and potentials for development (Sebastian Stolpp); 6 - Authorization procedures in France, and the new unique authorization (Fannie Lavoue); 7 - Approval procedures for biogas plants and the protection of neighbours' rights in Germany (Andreas Grosse); 8 - Regional strategy of methanation development in Ile-de-France (Veronique Charbeaux) 9 - Renewable region and biogas integration: the Brittany biogas plan (Nicolas Chapelat); 10 - Bioenergy regions and the role of biogas - Good examples for sustainable bio-energy use (Birger Kerckow); 11 - Evaluation for registration in france of digestates produced by anaerobic digestion (Patricia Merigout); 12 - Treatment and Conditioning of Fermentation Residues from Biogas Plants (Marcus Trommler); 13

  18. Regional Integrated Silvopastoral Approaches to Ecosystem Management Project

    OpenAIRE

    CIPAV (Centre For Research on Sustainable Agricultural Production Systems); CATIE (Centro Agronomico Tropical de Investigacion y Ensenanza); NITLAPAN

    2007-01-01

    Metadata only record The Regional Integrated Silvopastoral Approaches to Ecosystem Management Project introduces the payment for environmental services approach to silvopastoral farmers in Colombia, Costa Rica, and Nicaragua. The objectives of the project are to "demonstrate and measure a) the effects the introduction of payment incentives for environmental services to farmers on their adoption of integrated silvopastoral farming systems in degraded pasture lands; and b) the resulting impr...

  19. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  20. Implementation and test of proposals to integrate human factors in reporting and causal analysis in nuclear power plants

    International Nuclear Information System (INIS)

    Wilpert; Maimer, H.; Miller, R.; Fahlbruch, B.; Leiber, I.; Szameitat, S.; Baggen, R.; Gans, A.; Becker, G.

    1998-01-01

    The research project 'Implementation and Test of Proposals to integrate Human Factors in Reporting and Causal Analysis in Nuclear Power Plants' ('Implementation and Test', SR 2039/8) is based on two antecedent projects: 'Reporting System' (SR 2039/1) and 'Causal Analysis' (SR 2039/2). The project 'Implementation and Test' conducted various tests and introductory programs in cooperation with different target groups concerning the event analysis methodology 'SOL - Safety through Organizational Learning': Regulators, consultant organizations, union/works councillors and utilities. Thus, SOL was concurrently optimized and [apted for the practice in the German nuclear power industry. SOL was also validated in a German nuclear power plant using a concrete event. Results of the 'Implementation and Test' project demonstrate that SOL is fit to conduct event analyses practicably and economically with appropriate comprehensiveness and depth. SOL facilitates the identification of relevant contributing factors of events. This report concludes with various concrete proposals for the further development of the Program of the Federal Ministry of Environment, Nature Protection and Reactor Safety (BMU) and the Federal Agency of R[iation Protection (BfS) concerning 'The Contribution of Humans to Safety of Nuclear Power Plants'. (orig.) [de

  1. Optimal integration of linear Fresnel reflector with gas turbine cogeneration power plant

    International Nuclear Information System (INIS)

    Dabwan, Yousef N.; Mokheimer, Esmail M.A.

    2017-01-01

    Highlights: • A LFR integrated solar gas turbine cogeneration plant (ISGCPP) has been simulated. • The optimally integrated LFR with gas turbine cogeneration plant can achieve an annual solar share of 23%. • Optimal integration of LFR with gas turbine cogeneration system can reduce CO 2 emission by 18%. • Compared to a fully-solar-powered LFR plant, the optimal ISGCPP reduces the LEC by 83%. • ISGCPP reduces the LEC by 50% compared to plants integrated with carbon capture technology. - Abstract: Solar energy is an abundant resource in many countries in the Sunbelt, especially in the middle east, countries, where recent expansion in the utilization of natural gas for electricity generation has created a significant base for introducing integrated solar‐natural gas power plants (ISGPP) as an optimal solution for electricity generation in these countries. ISGPP reduces the need for thermal energy storage in traditional concentrated solar thermal plants and results in dispatchable power on demand at lower cost than stand-alone concentrated thermal power and much cheaper than photovoltaic plants. Moreover, integrating concentrated solar power (CSP) with conventional fossil fuel based thermal power plants is quite suitable for large-scale central electric power generation plants and it can be implemented in the design of new installed plants or during retrofitting of existing plants. The main objective of the present work is to investigate the possible modifications of an existing gas turbine cogeneration plant, which has a gas turbine of 150 MWe electricity generation capacity and produces steam at a rate of 81.4 at 394 °C and 45.88 bars for an industrial process, via integrating it with concentrated solar power system. In this regard, many simulations have been carried out using Thermoflow software to explore the thermo-economic performance of the gas turbine cogeneration plant integrated with LFR concentrated solar power field. Different electricity

  2. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  3. Integrated Network Analysis and Effective Tools in Plant Systems Biology

    Directory of Open Access Journals (Sweden)

    Atsushi eFukushima

    2014-11-01

    Full Text Available One of the ultimate goals in plant systems biology is to elucidate the genotype-phenotype relationship in plant cellular systems. Integrated network analysis that combines omics data with mathematical models has received particular attention. Here we focus on the latest cutting-edge computational advances that facilitate their combination. We highlight (1 network visualization tools, (2 pathway analyses, (3 genome-scale metabolic reconstruction, and (4 the integration of high-throughput experimental data and mathematical models. Multi-omics data that contain the genome, transcriptome, proteome, and metabolome and mathematical models are expected to integrate and expand our knowledge of complex plant metabolisms.

  4. Water system integration of a chemical plant

    International Nuclear Information System (INIS)

    Zheng Pingyou; Feng Xiao; Qian Feng; Cao Dianliang

    2006-01-01

    Water system integration can minimize both the freshwater consumption and the wastewater discharge of a plant. In industrial applications, it is the key to determine reasonably the contaminants and the limiting concentrations, which will decide the freshwater consumption and wastewater discharge of the system. In this paper, some rules to determine the contaminants and the limiting concentrations are proposed. As a case study, the water system in a chemical plant that produces sodium hydroxide and PVC (polyvinyl chloride) is integrated. The plant consumes a large amount of freshwater and discharges a large amount of wastewater, so minimization of both the freshwater consumption and the wastewater discharge is very important to it. According to the requirements of each water using process on the water used in it, the contaminants and the limiting concentrations are determined. Then, the optimal water reuse scheme is firstly studied based on the water network with internal water mains. To reduce the freshwater consumption and the wastewater discharge further, decentralized regeneration recycling is considered. The water using network is simplified by mixing some of the used water. After the water system integration, the freshwater consumption is reduced 25.5%, and the wastewater discharge is reduced 48%

  5. Implementation of the project of equipment reliability in the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Rios O, J. E.; Martinez L, A. G.

    2008-01-01

    A equipment is reliable if it fulfills the function for which was designed and when it is required. To implement a project of reliability in a nuclear power plant this associate to a process of continuous analysis of the operation, of the conditions and faults of the equipment. The analysis of the operation of a system, of the equipment of the same faults and the parts that integrate to equipment take to identify the potential causes of faults. The predictive analysis on components and equipment allow to rectify and to establish guides to optimize the maintenance and to guarantee the reliability and function of the same ones. The reliability in the equipment is without place to doubts a wide project that embraces from the more small component of the equipment going by the proof of the parts of reserve, the operation conditions until the operative techniques of analysis. Without place of doubt for a nuclear power plant the taking of decisions based on the reliability of their systems and equipment will be the appropriate for to assure the operation and reliability of the same one. In this work would appear the project of reliability its processes, criteria, indicators action of improvement and the interaction of the different disciplines from the Nuclear Power Plant of Laguna Verde like a fundamental point for it put in operation. (Author)

  6. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung

    2014-01-01

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently

  7. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2014-05-15

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently.

  8. Integrated disturbance analysis (IDA): A basis for expert systems in nuclear power plants

    International Nuclear Information System (INIS)

    Bastl, W.

    1987-01-01

    In the framework of a project sponsored by the Bundesminister fur Forschung und Technologie (BMFT) and the Rheinisch-Westfalisches Elektrizitatswerk AG (RWE) the concept of Integrated Disturbance Analysis (IDA) has been developed and applied to the Biblis Unit B Nuclear Power Plant. Rather than using the classical approach, which aims at finding the cause of a plant disturbance, the main goal was to make transparent to the operator what it really means for the process, when a set of parameters begins to deviate from its normal state. Therefore the goal was to help the operator to combine the information on the individual process parameters to the complete picture of the evolving transient, thus facilitating the decision about the importance of a disturbance for operational safety. Considering this goal the most important subjects taken care of were: to extend event sequence analysis by means of analog information; to provide adequate modelling of time dependent processes and feedback loops; to integrate IDA information effectively into the existing control room environment

  9. Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex

  10. Simulation-based valuation of project finance investments. Crucial aspects of power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Pietz, Matthaeus

    2010-12-15

    The liberalization of electricity markets transformed a regulated and stable market to a market with former unknown price volatility. This results in a high uncertainty which is mainly due to the, from an economic point of view, lack of storability of the commodity electricity. Thus investments in power plants are highly risky. This dissertation analyzes crucial aspects within the valuation of a power plant financed via project finance, a popular financing method for projects with high capital requirements. Starting with the development of a valuation model based on stochastic modelling of the future cash flows the focus of the analysis is on the impact of model complexity and electricity prices. (orig.)

  11. Decommissioning the Belgonucleaire Dessel MOX plant: presentation of the project and situation end august 2013

    Energy Technology Data Exchange (ETDEWEB)

    Cuchet, J.M. [TRACTEBEL ENGINEERING, Avenue Ariane, 7, B1200 Brussels (Belgium); Libon, H.; Verheyen, C. [BELGONUCLEAIRE S.A. / N.V. Europalaan, 20, B2480 Dessel (Belgium); Bily, J. [STUDSVIK GmbH, Karlsruher Strasse, 20, D75179 Pforzheim,(Germany); Boden, S. [SCK-CEN, Boeretang, 200, B2400 Mol (Belgium); Joffroy, F. [TECNUBEL N.V., Zandbergen, 1, B2480 Dessel (Belgium); Walthery, R. [BELGOPROCESS, Gravenstraat, 73, B2480 Dessel (Belgium)

    2013-07-01

    Belgonucleaire has been operating the Dessel MOX plant at an industrial scale between 1986 and 2006. During this period, 40 metric tons of plutonium (HM) have been processed into 90 reloads of MOX fuel for commercial light water reactors. The decision to stop the production in 2006 and to decommission the MOX plant was the result of the shrinkage of the MOX fuel market due to political and commercial factors. As a significant part of the decommissioning project of the Dessel MOX plant, about 170 medium-sized glove-boxes and about 1.200 metric tons of structure and equipment outside the glove-boxes are planned for dismantling. The license for the dismantling of the MOX plant was granted by Royal Decree in 2008 and the dismantling started in March 2009. The dismantling works are carried out by an integrated organization under leadership and responsibility of Belgonucleaire; this organization includes 3 main contractors, namely Tecnubel N.V., the THV ('Tijdelijke HandelsVereniging') Belgoprocess / SCK-CEN and Studsvik GmbH and Tractebel Engineering as project manager. In this paper, after having described the main characteristics of the project, the authors review the different organizational and technical options considered for the decommissioning of the glove-boxes; thereafter the main decision criteria (qualification of personnel and of processes, confinement, cutting techniques and radiation protection, safety aspects, alpha-bearing waste management) are analyzed as well. Finally the progress, the feedback and the lessons learned at the end of August 2013 are presented, giving the principal's and contractors point of view. (authors)

  12. Integrating a SOFC Plant with a Steam Turbine Plant

    DEFF Research Database (Denmark)

    Rokni, Masoud; Scappin, Fabio

    2009-01-01

    A Solid Oxide Fuel Cell (SOFC) is integrated with a Steam Turbine (ST) cycle. Different hybrid configurations are studied. The fuel for the plants is assumed to be natural gas (NG). Since the NG cannot be sent to the anode side of the SOFC directly, a desulfurization reactor is used to remove...

  13. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  14. Outside-in control -Does plant cell wall integrity regulate cell cycle progression?

    Science.gov (United States)

    Gigli-Bisceglia, Nora; Hamann, Thorsten

    2018-04-13

    During recent years it has become accepted that plant cell walls are not inert objects surrounding all plant cells but are instead highly dynamic, plastic structures. They are involved in a large number of cell biological processes and contribute actively to plant growth, development and interaction with environment. Therefore, it is not surprising that cellular processes can control plant cell wall integrity while, simultaneously, cell wall integrity can influence cellular processes. In yeast and animal cells such a bi-directional relationship also exists between the yeast/animal extra-cellular matrices and the cell cycle. In yeast, the cell wall integrity maintenance mechanism and a dedicated plasmamembrane integrity checkpoint are mediating this relationship. Recent research has yielded insights into the mechanism controlling plant cell wall metabolism during cytokinesis. However, knowledge regarding putative regulatory pathways controlling adaptive modifications in plant cell cycle activity in response to changes in the state of the plant cell wall are not yet identified. In this review, we summarize similarities and differences in regulatory mechanisms coordinating extra cellular matrices and cell cycle activity in animal and yeast cells, discuss the available evidence supporting the existence of such a mechanism in plants and suggest that the plant cell wall integrity maintenance mechanism might also control cell cycle activity in plant cells. This article is protected by copyright. All rights reserved.

  15. Environmental and socioeconomic aspects in the strategic analysis of a biomass power plant integration

    International Nuclear Information System (INIS)

    Varela, M.; Lechon, Y.; Saez, R.

    1999-01-01

    The aim of the work was to assess the potential weaknesses and threats of the integration of a biomass power plant proposed in a depressed area of Spain as well as to analyse the inherent strengths and opportunities that such a project could have in economic, technical or environmental terms. For this purpose an analysis of site, biomass resources, problems associated to fuel mix combustion, electricity production and connection were assessed. The socioeconomic (employment, GDP effects or tax revenue impact) and environmental (human health, soil erosion, fertiliser application) outcomes associated with the proposed biomass scheme have been evaluated. Finally, a list of actions to take into account for successful implementation of this proposed project has been defined. (author)

  16. Integrated control centre concepts for CANDU power plants

    International Nuclear Information System (INIS)

    Lupton, L.R.; Davey, E.C.; Lapointe, P.A.; Shah, R.R.

    1990-01-01

    The size and complexity of nuclear power plants has increased significantly in the last 20 years. There is general agreement that plant safety and power production can be enhanced if more operational support systems that are significantly different from the ones based on the more conventional technologies used in plant control rooms. In particular, artificial intelligence and related technologies will play a major role in the development of innovative methods for information processing and presentation. These technologies must be integrated into the overall management and control philosophy of the plant and not be treated as vehicles to implement point solutions. The underlying philosophy behind our approach is discussed in this paper. Operator support systems will integrate into the overall control philosophy by complementing the operator. Four support systems are described; each is a prototype of a system being considered for the CANDU 3 control centre

  17. Integrated control centre concepts for CANDU power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lupton, L. R.; Davey, E. C.; Lapointe, P. A.; Shah, R. R.

    1990-01-15

    The size and complexity of nuclear power plants has increased significantly in the last 20 years. There is general agreement that plant safety and power production can be enhanced if more operational support systems that are significantly different from the ones based on the more conventional technologies used in plant control rooms. In particular, artificial intelligence and related technologies will play a major role in the development of innovative methods for information processing and presentation. These technologies must be integrated into the overall management and control philosophy of the plant and not be treated as vehicles to implement point solutions. The underlying philosophy behind our approach is discussed in this paper. Operator support systems will integrate into the overall control philosophy by complementing the operator. Four support systems are described; each is a prototype of a system being considered for the CANDU 3 control centre.

  18. Economic-financial analysis of 'Angra 3 Nuclear Power Plant' project

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2005-01-01

    This paper presents an economic-financial evaluation of 'Angra 3 Nuclear Power Plant' project and estimates the lowest power tariff value at which power potentially made available may be commercialized and yet ensure the project a profitability level agreeable to the interests of economic agents and shareholders. According to the 'project evaluation' practice, Angra 3 power generation was considered separately from ELETRONUCLEAR's operating plants (Angra 1 and Angra 2), thus preventing result distortions bound to occur if the economic-financial variables of the new project were analyzed associated with financial commitments and commercialization conditions resulting from the project implementation process and the generated power commercialization conditions, respectively. For this evaluation different technical and economic scenarios were devised, and the theory of Capital Asset Pricing Model for Own Capital cost and that of Weighted Average Cost of Capital were used in addition to the forecast of the Statement of Results and Free Cash flow of Shareholders throughout the power plant life, which is the estimate basis for the lowest power tariff value and the Internal Return Rate of the project. The evaluation conclusion is that Angra 3 project is technically and economically feasible and competitive as compared to the new large power generation projects planned for power supply in Brazil in the next decade, mainly in the Southeast. (author)

  19. The integrated workstation: A common, consistent link between nuclear plant personnel and plant information and computerized resources

    International Nuclear Information System (INIS)

    Wood, R.T.; Knee, H.E.; Mullens, J.A.; Munro, J.K. Jr.; Swail, B.K.; Tapp, P.A.

    1993-01-01

    The increasing use of computer technology in the US nuclear power industry has greatly expanded the capability to obtain, analyze, and present data about the plant to station personnel. Data concerning a power plant's design, configuration, operational and maintenance histories, and current status, and the information that can be derived from them, provide the link between the plant and plant staff. It is through this information bridge that operations, maintenance and engineering personnel understand and manage plant performance. However, it is necessary to transform the vast quantity of data available from various computer systems and across communications networks into clear, concise, and coherent information. In addition, it is important to organize this information into a consolidated, structured form within an integrated environment so that various users throughout the plant have ready access at their local station to knowledge necessary for their tasks. Thus, integrated workstations are needed to provide the inquired information and proper software tools, in a manner that can be easily understood and used, to the proper users throughout the plant. An effort is underway at the Oak Ridge National Laboratory to address this need by developing Integrated Workstation functional requirements and implementing a limited-scale prototype demonstration. The integrated Workstation requirements will define a flexible, expandable computer environment that permits a tailored implementation of workstation capabilities and facilitates future upgrades to add enhanced applications. The functionality to be supported by the integrated workstation and inherent capabilities to be provided by the workstation environment win be described. In addition, general technology areas which are to be addressed in the Integrated Workstation functional requirements will be discussed

  20. Integrated chemical plants at the pulp mill

    Energy Technology Data Exchange (ETDEWEB)

    Ehtonen, P.; Hurme, M.; Jaervelaeinen, M.

    1995-12-31

    The goal of this paper is to present how the chemical plants can be integrated to the pulp mill. The integration renders possible to balance the chemical consumptions. The total mass balance of a pulp mill with the incoming fuel material and the outgoing waste and flue gases are discussed. The balance figures are presented for the chemicals of the modern fibre line, which will produce fully bleached softwood pulp with an improved effluent quality. The main benefits are lower chemical and transportation costs. The principal over-all plant process block diagrams and process descriptions are presented. The presented info system provides real time information on process and production status at overall mill and department levels. (author)

  1. Plant life management. An integral part of operation and maintenance policy

    International Nuclear Information System (INIS)

    Faidy, C.; Hutin, J.-P.

    2002-01-01

    Electricite de France is now operating 58 PWR nuclear power plants that produce 75% of electricity in France. Besides maintaining safety and availability on a routine basis, it is outmost important to protect the investment. That is the reason why EDF is devoting important resources to implement ageing management concern as an integral part of operation and maintenance programs (for example through appropriate data collection and analysis, specific repair and replacement projects and important anticipation efforts, taking in account the high level of standardisation of the units). A particular organisation has been set up to continuously observe and analyse all activities so as to make sure that ageing concern is correctly taken in account in strategies and that no decisions are susceptible to impair plant lifetime. This 'lifetime program' is paying attention to technical issues associated with main components but is also dealing with issues related to economics and industry situation. (orig.)

  2. The Impact of Organizational Knowledge Integrators on Cooperative R&D Projects

    DEFF Research Database (Denmark)

    Bulathsinhala, Nadika

    2014-01-01

    This paper addresses the fact that R&D projects that incorporate external knowledge sources not only depend on the number of sources, but also on integrating the right source. An organizational knowledge integrator has a natural interest due to its position in the value chain and the technology...... phase to pull the knowledge from earlier phases of development closer towards commercialization. The aim of the paper is to examine if organizational knowledge integrators in R&D projects have a positive impact on innovative performance compared to projects that do not involve a knowledge integrator...

  3. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  4. The development of a wood fuel gasification plant utilising short rotation coppice and forestry residues: project ARBRE

    International Nuclear Information System (INIS)

    Pitcher, K.F.; Lundbergt, H.

    1997-01-01

    This paper will discuss the development of ARBRE Energy, a joint venture company that includes Yorkshire Environmental of the United Kingdom and Tenniska Processer AB of Sweden. The project will establish 2000 hectares of short rotation coppices, some of which will be organically fertilized with digested sewage sludges, to provide 80% of the fuel requirements of a biomass integrated gasification combined cycle (BIGCC) electricity generation plant. The remaining 20% of the fuel requirements will come from forestry waste, although in the first 5 years all the fuel will come from the forestry sources until the coppices are mature. The project will construct a gasification plant at Eggborough, North Yorkshire, England, which will provide gas to a gas turbine and steam turbine generation system, producing 10 MW and exporting 8 MW of electricity. It has been included in the 1993 tranche of the UK's Non Fossil Fuel Obligation (NFFO) and has gained financial support from the European Commission's THERMIE programme as a targeted BIGCC project. The project's technical and environmental effects and benefits will be examined in detail, together with the award of its planning permit and agreement on its operating license. (author)

  5. Development of a strategic plan for an international R and D project on innovative nuclear fuel cycles and power plants

    International Nuclear Information System (INIS)

    Kendall, J.; Choi, J.S.

    2002-01-01

    The long-term outlook for nuclear energy should be considered in a broader perspective of future energy needs, operational safety, proliferation and environmental impacts. An Advisory Group Meeting (AGM) on Development of a Strategic Plan for an International R and D Project on Innovative Nuclear Fuel Cycles and Power Plants was convened in Vienna in October 1999 to assess the criteria, the needs for international cooperation, and to formulate a strategic plan for project integration. (author)

  6. Financing Nuclear Power Plant Projects. A New Paradigm?

    International Nuclear Information System (INIS)

    Pehuet Lucet, Fabienne

    2015-05-01

    There are currently 435 operable nuclear power reactors around the world, with a further 71 under construction. Two main proven financing models were applied to nuclear plants in the past: the national model, and the corporate model. The historical model of financing is the national model. It allowed for the most efficient risk allocation model in then-regulated national electricity markets: government or state-owned utilities with government guarantee assumed the risks of building nuclear power plants locally. The national model has proven to be efficient in France, Russia and the USA where it was modified to support private business initiatives. It was then replicated in Japan, Korea and China where significant nuclear programs were developed. In the corporate business model, the owner of the plant assumes most of the risk, but various schemes are used to mitigate the owner's risk by transmitting large areas of risks to others: vendors for construction risk as in Finland, government through loans guarantees etc. As projects became international, a set of common principles were approved by OECD countries concerning financing and the role of Export Credit Agencies. The objective was to provide competition rules whereby exporters compete on the basis of the price and quality of their products rather than the financial terms provided. Various combinations of these models were and still are implemented. Pure Project Finance was not implemented for nuclear power plants, but the model nurtures reflections about new financing models. The context in which nuclear power projects are now decided and financed changed drastically: it is a new paradigm. Risk allocation and financial conditions are at the forefront of competition to win new nuclear projects' tenders insofar as reducing uncertainties is a decisive competition edge. In a context of electricity market deregulation and high construction risks, investors and lenders require more and more securities to

  7. The Plant-Window System: A framework for an integrated computing environment at advanced nuclear power plants

    International Nuclear Information System (INIS)

    Wood, R.T.; Mullens, J.A.; Naser, J.A.

    1997-01-01

    Power plant data, and the information that can be derived from it, provide the link to the plant through which the operations, maintenance and engineering staff understand and manage plant performance. The extensive use of computer technology in advanced reactor designs provides the opportunity to greatly expand the capability to obtain, analyze, and present data about the plant to station personnel. However, to support highly efficient and increasingly safe operation of nuclear power plants, it is necessary to transform the vast quantity of available data into clear, concise, and coherent information that can be readily accessed and used throughout the plant. This need can be met by an integrated computer workstation environment that provides the necessary information and software applications, in a manner that can be easily understood and sued, to the proper users throughout the plan. As part of a Cooperative Research and Development Agreement with the Electric Power Research Institute, the Oak Ridge National laboratory has developed functional requirements for a Plant-Wide Integrated Environment Distributed On Workstations (Plant-Window) System. The Plant-Window System (PWS) can serve the needs of operations, engineering, and maintenance personnel at nuclear power stations by providing integrated data and software applications within a common computing environment. The PWS requirements identify functional capabilities and provide guidelines for standardized hardware, software, and display interfaces so as to define a flexible computing environment for both current generation nuclear power plants and advanced reactor designs

  8. Long Frontal Projections Help Battus philenor (Lepidoptera: Papilionidae) Larvae Find Host Plants.

    Science.gov (United States)

    Kandori, Ikuo; Tsuchihara, Kazuko; Suzuki, Taichi A; Yokoi, Tomoyuki; Papaj, Daniel R

    2015-01-01

    Animals sometimes develop conspicuous projections on or near their heads as, e.g., weaponry, burrowing or digging tools, and probes to search for resources. The frontal projections that insects generally use to locate and assess resources are segmented appendages, including antennae, maxillary palps, and labial palps. There is no evidence to date that arthropods, including insects, use projections other than true segmental appendages to locate food. In this regard, it is noteworthy that some butterfly larvae possess a pair of long antenna-like projections on or near their heads. To date, the function of these projections has not been established. Larvae of pipevine swallowtail butterflies Battus philenor (Papilionidae) have a pair of long frontal fleshy projections that, like insect antennae generally, can be actively moved. In this study, we evaluated the possible function of this pair of long moveable frontal projections. In laboratory assays, both frontal projections and lateral ocelli were shown to increase the frequency with which search larvae found plants. The frontal projections increased finding of host and non-host plants equally, suggesting that frontal projections do not detect host-specific chemical cues. Detailed SEM study showed that putative mechanosensillae are distributed all around the frontal as well as other projections. Taken together, our findings suggest that the frontal projections and associated mechanosensillae act as vertical object detectors to obtain tactile information that, together with visual information from lateral ocelli and presumably chemical information from antennae and mouthparts, help larvae to find host plants. Field observations indicate that host plants are small and scattered in southern Arizona locations. Larvae must therefore find multiple host plants to complete development and face significant challenges in doing so. The frontal projections may thus be an adaptation for finding a scarce resource before starving to

  9. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  10. Collaborative Teaching and Learning through Multi-Institutional Integrated Group Projects

    Science.gov (United States)

    Long, Suzanna K.; Carlo, Héctor J.

    2013-01-01

    This teaching brief describes an innovative multi-institutional initiative through which integrated student groups from different courses collaborate on a common course project. In this integrated group project, students are asked to design a decentralized manufacturing organization for a company that will manufacture industrial Proton-Exchange…

  11. Introducing WISDEM:An Integrated System Modeling for Wind Turbines and Plant (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Dykes, K.; Graf, P.; Scott, G.; Ning, A.; King, R.; Guo, Y.; Parsons, T.; Damiani, R.; Felker, F.; Veers, P.

    2015-01-01

    The National Wind Technology Center wind energy systems engineering initiative has developed an analysis platform to leverage its research capabilities toward integrating wind energy engineering and cost models across wind plants. This Wind-Plant Integrated System Design & Engineering Model (WISDEM) platform captures the important interactions between various subsystems to achieve a better National Wind Technology Center wind energy systems engineering initiative has developed an analysis platform to leverage its research capabilities toward integrating wind energy engineering and cost models across wind plants. This Wind-Plant Integrated System Design & Engineering Model (WISDEM) platform captures the important interactions between various subsystems to achieve a better understanding of how to improve system-level performance and achieve system-level cost reductions. This work illustrates a few case studies with WISDEM that focus on the design and analysis of wind turbines and plants at different system levels.

  12. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  13. The Plant-Window system: A flexible, expandable computing environment for the integration of power plant activities

    International Nuclear Information System (INIS)

    Wood, R.T.; Mullens, J.A.; Naser, J.A.

    1994-01-01

    Power plant data, and the information that can be derived from it, provide the link to the plant through which the operations, maintenance and engineering staff understand and manage plant performance. The increasing use of computer technology in the US nuclear power industry has greatly expanded the capability to obtain, analyze, and present data about the plant to station personnel. However, it is necessary to transform the vast quantity of available data into clear, concise, and coherent information that can be readily accessed and used throughout the plant. This need can be met by an integrated computer workstation environment that provides the necessary information and software applications, in a manner that can be easily understood and used, to the proper users throughout the plant. As part of a Cooperative Research and Development Agreement with the Electric Power Research Institute, the Oak Ridge National Laboratory has developed functional requirements for a Plant-Wide Integrated Environment Distributed on Workstations (Plant-Window) System. The Plant-Window System (PWS) can serve the needs of operations, engineering, and maintenance personnel at nuclear power stations by providing integrated data and software applications (e.g., monitoring, analysis, diagnosis, and control applications) within a common environment. The PWS requirements identify functional capabilities and provide guidelines for standardized hardware, software, and display interfaces to define a flexible computer environment that permits a tailored implementation of workstation capabilities and facilitates future upgrades

  14. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  15. TMI-2 Vessel Investigation Project integration report

    International Nuclear Information System (INIS)

    Wolf, J.R.; Rempe, J.L.; Stickler, L.A.; Korth, G.E.; Diercks, D.R.; Neimark, L.A.; Akers, D.W.; Schuetz, B.K.; Shearer, T.L.; Chavez, S.A.; Thinnes, G.L.; Witt, R.J.; Corradini, M.L.; Kos, J.A.

    1994-03-01

    The Three Mile Island Unit 2 (TMI-2) Vessel Investigation Project (VIP) was an international effort that was sponsored by the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The primary objectives of the VIP were to extract and examine samples from the lower head and to evaluate the potential modes of failure and the margin of structural integrity that remained in the TMI-2 reactor vessel during the accident. This report presents a summary of the major findings and conclusions that were developed from research during the VIP. Results from the various elements of the project are integrated to form a cohesive understanding of the vessel's condition after the accident

  16. TMI-2 Vessel Investigation Project integration report

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, J. R.; Rempe, J. L.; Stickler, L. A.; Korth, G. E.; Diercks, D. R.; Neimark, L. A.; Akers, D W; Schuetz, B. K.; Shearer, T L; Chavez, S. A.; Thinnes, G. L.; Witt, R. J.; Corradini, M L; Kos, J. A. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1994-03-01

    The Three Mile Island Unit 2 (TMI-2) Vessel Investigation Project (VIP) was an international effort that was sponsored by the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The primary objectives of the VIP were to extract and examine samples from the lower head and to evaluate the potential modes of failure and the margin of structural integrity that remained in the TMI-2 reactor vessel during the accident. This report presents a summary of the major findings and conclusions that were developed from research during the VIP. Results from the various elements of the project are integrated to form a cohesive understanding of the vessel`s condition after the accident.

  17. A successful integrated project.

    Science.gov (United States)

    Zheng, P

    1994-10-01

    The experiences of the Juxian County Family Planning Committee of Shandong Province, China, were discussed in terms of the integration of family planning with income generation activities in rural areas. The integrated program was initiated in 1988 with pilot programs established by the Qiaoshan Family Planning Association to develop marketable skills in carpet weaving and grass braiding in Xiazhuang Town and Qiaoshan Township. The program gave priority of admission to women with only children and those who practiced family planning. 1400 women were recruited in these factories. Other income generation programs were developed for silkworm breeding and silk reeling, woolen embroidery, and printing. High ranking officials of the China Family Planning Association commended the work in income generation and family planning in Juxian County. This recognition spurred the second phase of development by the county family planning association: the establishment of village operated factories and mills for native products. By the end of 1991, there were 26 such projects in the county and per capita income to women increased by RMB 678 yuan. In the third stage of 1992, the number of association enterprises increased to 196 with recruitment of over 18,000 reproductive age women. The programs were initiated with collective funds from farmers and villages. The 170 projects in 1992 were developed with an investment of 9.6 million yuan, of which 2.26 million yuan was from individuals (23.5%). Emphasis was placed on self-reliance and recruitment of women with one child, women with 2 daughters and tubal ligations, and family planning motivators. The consequences of the integrated program were weakening traditional customs of marriage and childbearing, improvement in socioeconomic status of women, and effective service delivery of family planning and maternal and child health care services.

  18. Integration of torrefaction in CHP plants – A case study

    International Nuclear Information System (INIS)

    Starfelt, Fredrik; Tomas Aparicio, Elena; Li, Hailong; Dotzauer, Erik

    2015-01-01

    Highlights: • We model the integration of a torrefaction reactor in a CHP plant. • Techno-economic analysis for the system is performed. • Flue gas integration of torrefaction show better performance. • Heat or electricity production is not compromised in the proposed system. - Abstract: Torrefied biomass shows characteristics that resemble those of coal. Therefore, torrefied biomass can be co-combusted with coal in existing coal mills and burners. This paper presents simulation results of a case study where a torrefaction reactor was integrated in an existing combined heat and power plant and sized to replace 25%, 50%, 75% or 100% of the fossil coal in one of the boilers. The simulations show that a torrefaction reactor can be integrated with existing plants without compromising heat or electricity production. Economic and sensitivity analysis show that the additional cost for integrating a torrefaction reactor is low which means that with an emission allowance cost of 37 €/ton CO 2 , the proposed integrated system can be profitable and use 100% renewable fuels. The development of subsidies will affect the process economy. The determinant parameters are electricity and fuel prices

  19. The integrated project: a promising promotional strategy for primary health care.

    Science.gov (United States)

    Daniel, C; Mora, B

    1985-10-01

    The integrated project using parasite control and nutrition as entry points for family planning practice has shown considerable success in promoting health consciousness among health workers and project beneficiaries. This progress is evident in the Family Planning, Parasite Control and Nutrition (FAPPCAN) areas. The project has also mobilized technical and financial support from the local government as well as from private and civic organizations. The need for integration is underscored by the following considerations: parasite control has proved to be effective for preventive health care; the integrated project uses indigenous community health workers to accomplish its objectives; the primary health care (PHC) movement depends primarily on voluntary community participation and the integrated project has shown that it can elicit this participation. The major health problems in the Philippines are: a prevalence of communicable and other infectious diseases; poor evironmental sanitation; malnutrition; and a rapid population growth rate. The integrated program utilizes the existing village health workers in identifying problems related to family planning, parasite control and nutrition and integrates these activities into the health delivery system; educates family members on how to detect health and health-related problems; works out linkages with government agencies and the local primary health care committee in defining the scope of health-related problems; mobilizes community members to initiate their own projects; gets the commitment of village officials and committe members. The integrated project operates within the PHC. A health van with a built-in video playback system provides educational and logistical support to the village worker. The primary detection and treatment of health problems are part of the village health workers' responsibilities. Research determines the project's capability to reactivate the village primary health care committees and sustain

  20. Wind Plant Performance Prediction (WP3) Project

    Energy Technology Data Exchange (ETDEWEB)

    Craig, Anna [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-26

    The methods for analysis of operational wind plant data are highly variable across the wind industry, leading to high uncertainties in the validation and bias-correction of preconstruction energy estimation methods. Lack of credibility in the preconstruction energy estimates leads to significant impacts on project financing and therefore the final levelized cost of energy for the plant. In this work, the variation in the evaluation of a wind plant's operational energy production as a result of variations in the processing methods applied to the operational data is examined. Preliminary results indicate that selection of the filters applied to the data and the filter parameters can have significant impacts in the final computed assessment metrics.

  1. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Demick, L.E.

    2011-01-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  2. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  3. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  4. Fully integrated safeguards and security for reprocessing plant monitoring

    International Nuclear Information System (INIS)

    Duran, Felicia Angelica; Ward, Rebecca; Cipiti, Benjamin B.; Middleton, Bobby D.

    2011-01-01

    Nuclear fuel reprocessing plants contain a wealth of plant monitoring data including material measurements, process monitoring, administrative procedures, and physical protection elements. Future facilities are moving in the direction of highly-integrated plant monitoring systems that make efficient use of the plant data to improve monitoring and reduce costs. The Separations and Safeguards Performance Model (SSPM) is an analysis tool that is used for modeling advanced monitoring systems and to determine system response under diversion scenarios. This report both describes the architecture for such a future monitoring system and present results under various diversion scenarios. Improvements made in the past year include the development of statistical tests for detecting material loss, the integration of material balance alarms to improve physical protection, and the integration of administrative procedures. The SSPM has been used to demonstrate how advanced instrumentation (as developed in the Material Protection, Accounting, and Control Technologies campaign) can benefit the overall safeguards system as well as how all instrumentation is tied into the physical protection system. This concept has the potential to greatly improve the probability of detection for both abrupt and protracted diversion of nuclear material.

  5. Inventory of cassava plant protection and development projects in ...

    African Journals Online (AJOL)

    A total of 303 cassava protection and development projects were identified of which about half are plant protection-oriented. Most activities on cassava protection have been centred on biological control and host plant resistance. The least activity has been on chemical control. The applicability of the collected database is ...

  6. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Hopkins, J.R.

    1998-01-01

    An integrated approach to plant life management has been developed for CANDU reactors. Strategies, methods, and procedures have been developed for assessment of critical systems structures and components and for implementing a reliability centred maintenance program. A Technology Watch program is being implemented to eliminate 'surprises'. Specific work has been identified for 1998. AECL is working on the integrated program with CANDU owners and seeks participation from other CANDU owners

  7. Integrating ecological restoration into CDM forestry projects

    International Nuclear Information System (INIS)

    Ma, Maohua; Haapanen, Toni; Singh, Ram Babu; Hietala, Reija

    2014-01-01

    Highlights: • Concerns and issues in sustainability of CDM forestry projects are reviewed. • Ecological restoration is suggested to be integrated in the CDM framework. • As an ecosystem supporting service, soil restoration on degraded land is of primary importance. • Regenerating forests naturally rather than through monoculture plantations is suggested. • Potential social impacts of ecological restoration are discussed. - Abstract: The Clean Development Mechanism (CDM) is proposed to reduce greenhouse gas emissions and promote sustainable development. CDM forestry projects should contribute to mitigation of climate change through afforestation and reforestation (A/R) activities on degraded land in developing countries. However, like other types of CDM projects, the forestry projects have encountered a number of concerns and critiques. Appropriate approaches and concrete aims to achieve long-term sustainability have been lacking, and reforms have therefore been called for. The aims of this paper are to examine the published information relevant to these concerns, and frame appropriate approaches for a more sustainable CDM. In this review, as a first step to tackle some of these issues, ecological restoration is suggested for integration into the CDM framework. Essentially, this involves the restoration of ecosystem supporting service (soil restoration), upon which forests regenerate naturally rather than establishing monoculture plantations. In this way, forestry projects would bring cost-effective opportunities for multiple ecosystem services. Potential approaches, necessary additions to the monitoring plans, and social impacts of ecological restoration in CDM projects are discussed

  8. Information Integration and Communication in Plant Growth Regulation.

    Science.gov (United States)

    Chaiwanon, Juthamas; Wang, Wenfei; Zhu, Jia-Ying; Oh, Eunkyoo; Wang, Zhi-Yong

    2016-03-10

    Plants are equipped with the capacity to respond to a large number of diverse signals, both internal ones and those emanating from the environment, that are critical to their survival and adaption as sessile organisms. These signals need to be integrated through highly structured intracellular networks to ensure coherent cellular responses, and in addition, spatiotemporal actions of hormones and peptides both orchestrate local cell differentiation and coordinate growth and physiology over long distances. Further, signal interactions and signaling outputs vary significantly with developmental context. This review discusses our current understanding of the integrated intracellular and intercellular signaling networks that control plant growth. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. Engineering for new-built nuclear power plant projects

    International Nuclear Information System (INIS)

    Gonzalez Lopez, A.

    2012-01-01

    This article reviews the opportunities existing in the market (electrical utilities and reactor vendors) for an engineering company with the profile of Empresarios Agrupados (EA) in new-built nuclear power plant projects. To do this, reference is made to some representative examples of projects in which EA has been participating recently. the article concludes sharing with the reader some lessons learned from this participation. (Author)

  10. Integrated systems for power plant cooling and wastewater management

    International Nuclear Information System (INIS)

    Haith, D.A.

    1975-01-01

    The concept of integrated management of energy and water resources, demonstrated in hydropower development, may be applicable to steam-generated power, also. For steam plants water is a means of disposing of a waste product, which is unutilized energy in the form of heat. One framework for the evolution of integrated systems is the consideration of possible technical linkages between power plant cooling and municipal wastewater management. Such linkages include the use of waste heat as a mechanism for enhancing wastewater treatment, the use of treated wastewater as make-up for evaporative cooling structures, and the use of a pond or reservoir for both cooling and waste stabilization. This chapter reports the results of a systematic evaluation of possible integrated systems for power plant cooling and waste water management. Alternatives were analyzed for each of three components of the system--power plant cooling (condenser heat rejection), thermally enhanced waste water treatment, and waste water disposal. Four cooling options considered were evaporative tower, open cycle, spray pond, and cooling pond. Three treatment alternatives considered were barometric condenser-activated sludge, sectionalized condenser-activated sludge, and cooling/stabilization pond. Three disposal alternatives considered were ocean discharge, land application (spray irrigation), and make-up (for evaporative cooling). To facilitate system comparisons, an 1100-MW nuclear power plant was selected. 31 references

  11. Instrumentation project of 3rd desalination plant at Tuas (Singapore)

    OpenAIRE

    Charco Iniesta, Sara

    2016-01-01

    This project consists on the description of instrumentation used in Tuas III desalination plant at Singapore and its flow process description. The project has been developed as part of the work of the instrumentation department of the responsible company of the engineering design of Tuas III desalination plant. First of all is important to know the water problems which suffer all the people who live in Singapore. Singapore is a city-state and is home to 5.5 million residents. The coun...

  12. Integrated project for increasing the capacity of spent fuel pools at Cofrentes NPP

    International Nuclear Information System (INIS)

    Rebollo Garcia, C.; Arana, S.

    1996-01-01

    The current storage capacity of the Cofrentes NPP will have reached its limit by the end of its 15th cycle, in the year 2005. The works performed by Empresarios Agrupados for IBERDROLA show that it is possible to increase this capacity in successive phases, so as to make the Power Plant self-sufficient for 16 more years (up to 2021) in the case of compact storage, or for 50 more years (2055) in the case of consolidated storage or second level storage. Optimisation of the management of high-activity wastes goes with a series of tasks which come under the group referred to as Integrated Project for Increasing the Capacity of Spent Fuel Pools. The main activities of the project can be summarised under the following three items: increase of storage capacity (feasibility study, specification for the purchase of racks, manufacture, assembly and tests), improvement of the capacity of the pool cooling system and modification of the components and accessories located inside the pools which interfere with the new racks. Another series of activities with less technical and economic impact are: modification of fuel handling machines, management of generated radwaste, licensing and modification of plant documentation (seismic analysis, radiation areas, as-built drawings and verification of the validation of purification and HVAC systems). (Author)

  13. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  14. Researchers' experiences, positive and negative, in integrative landscape projects

    NARCIS (Netherlands)

    Tress, B.; Tress, G.; Fry, G.

    2005-01-01

    Integrative (interdisciplinary and transdisciplinary) landscape research projects are becoming increasingly common. As a result, researchers are spending a larger proportion of their professional careers doing integrative work, participating in shifting interdisciplinary teams, and cooperating

  15. C.A.S.H. - a transient integrated plant model for a HTR-module power plant. User manual

    International Nuclear Information System (INIS)

    Biesenbach, R.; Lauer, A.; Struth, S.

    1997-07-01

    The computer code C.A.S.H. has been developed as an integrated plant model for the HTR-Module reactor, in order to treat safety related questions about this type of power plant which require a detailed numeric simulation of the transient behaviour of the integrated plant. The present report contains the user manual for this plant model. It consists of three parts: In the first part, the code structure and functions, the course of the simulation calculations, and important code parts are described. The second part is devoted to the practical application and explains extensively the handling of the complex code system with several sample calculations. These computing cases comprise load-follow transients and the shutdown procedure of the HTR-Module and are presented and discussed with the full input data, job patterns, and numerous computer graphics. The third part contains the input manual of C.A.S.H. and is rather extensive as it includes the complete inputs of several reactor component computer codes along with the control program of the integrated plant model. (orig./DG) [de

  16. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  17. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  18. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  19. Radwaste inventories and projections: an overview

    International Nuclear Information System (INIS)

    Notz, K.J.

    1982-07-01

    The Integrated Data Base program was set up to provide fully integrated and reconciled inventories, characteristics, and projections for spent nuclear fuel and all categories of radioactive waste. Eight summary papers, six of which were presented at an ANS special session in Los Angeles in June 1982, are included in this report: data base needs and functions: national planning; integrated data base for spent fuel and radwaste: inventories; integrated data base projections; RAWSYM: radioactive waste management system; NWTS program waste projection data needs; low-level waste management data base system; waste sludge composition at the Savannah River Plant; and summary of characteristics of transuranic waste found at DOE sites

  20. Evaluation of a Cogeneration Plant with Integrated Fuel Factory; Integrerad braenslefabrik med kraftvaermeanlaeggning - en utvaerdering

    Energy Technology Data Exchange (ETDEWEB)

    Atterhem, Lars

    2002-12-01

    A feasibility study was carried out in 1993 by Skellefteaa Kraft AB, to analyse the technical and economical possibilities to build a new baseload district heating production plant. The conclusion from the study was that, as a first step, a new cogeneration plant, based on a circulating fluidised bed boiler, should be built. The commissioning of the cogeneration plant took place in autumn 1996. The plant was prepared for a future integration with a biofuel drying process for pellets production. During spring 1996 an investment decision was taken and the fuel factory was erected in may 1997. Vaermeforsk Service AB has financed this research project and the Swedish state energy program (Fabel) has contributed with 33,7 Million SEK to the financing of the recovery electric power generation part of the fuel factory. The aim with this research project has been to evaluate and compare the integrated cogeneration plant fuel factory concept with a conventional co-generation plant, specially when it comes to increased power generation. The fuel factory comprises of fuel feeding system, fuel dryer, steam converter from fuel moisture to low pressure process steam, low pressure condensing turbine, cooling water system, fuel pellets production and storage with ship loading plant in the harbour of Skellefteaa. The steam to the fuel factory is extracted from the cogeneration turbine at a pressure level between 12-26 bar and the extraction flow has then already generated power in the cogeneration turbine. Power is also generated in the low pressure condensing turbine of the fuel factory. The low pressure steam is generated with fuel moisture in the steam converter. During the first years of operation there has been both conventional commissioning problems but also technical problems related to the new process concept. The last are for example corrosion and erosion problems, fouling problems of heat exchangers, capacity and leakage problems. The performance goals of the fuel

  1. The iPlant Collaborative: Cyberinfrastructure for Plant Biology

    Science.gov (United States)

    Goff, Stephen A.; Vaughn, Matthew; McKay, Sheldon; Lyons, Eric; Stapleton, Ann E.; Gessler, Damian; Matasci, Naim; Wang, Liya; Hanlon, Matthew; Lenards, Andrew; Muir, Andy; Merchant, Nirav; Lowry, Sonya; Mock, Stephen; Helmke, Matthew; Kubach, Adam; Narro, Martha; Hopkins, Nicole; Micklos, David; Hilgert, Uwe; Gonzales, Michael; Jordan, Chris; Skidmore, Edwin; Dooley, Rion; Cazes, John; McLay, Robert; Lu, Zhenyuan; Pasternak, Shiran; Koesterke, Lars; Piel, William H.; Grene, Ruth; Noutsos, Christos; Gendler, Karla; Feng, Xin; Tang, Chunlao; Lent, Monica; Kim, Seung-Jin; Kvilekval, Kristian; Manjunath, B. S.; Tannen, Val; Stamatakis, Alexandros; Sanderson, Michael; Welch, Stephen M.; Cranston, Karen A.; Soltis, Pamela; Soltis, Doug; O'Meara, Brian; Ane, Cecile; Brutnell, Tom; Kleibenstein, Daniel J.; White, Jeffery W.; Leebens-Mack, James; Donoghue, Michael J.; Spalding, Edgar P.; Vision, Todd J.; Myers, Christopher R.; Lowenthal, David; Enquist, Brian J.; Boyle, Brad; Akoglu, Ali; Andrews, Greg; Ram, Sudha; Ware, Doreen; Stein, Lincoln; Stanzione, Dan

    2011-01-01

    The iPlant Collaborative (iPlant) is a United States National Science Foundation (NSF) funded project that aims to create an innovative, comprehensive, and foundational cyberinfrastructure in support of plant biology research (PSCIC, 2006). iPlant is developing cyberinfrastructure that uniquely enables scientists throughout the diverse fields that comprise plant biology to address Grand Challenges in new ways, to stimulate and facilitate cross-disciplinary research, to promote biology and computer science research interactions, and to train the next generation of scientists on the use of cyberinfrastructure in research and education. Meeting humanity's projected demands for agricultural and forest products and the expectation that natural ecosystems be managed sustainably will require synergies from the application of information technologies. The iPlant cyberinfrastructure design is based on an unprecedented period of research community input, and leverages developments in high-performance computing, data storage, and cyberinfrastructure for the physical sciences. iPlant is an open-source project with application programming interfaces that allow the community to extend the infrastructure to meet its needs. iPlant is sponsoring community-driven workshops addressing specific scientific questions via analysis tool integration and hypothesis testing. These workshops teach researchers how to add bioinformatics tools and/or datasets into the iPlant cyberinfrastructure enabling plant scientists to perform complex analyses on large datasets without the need to master the command-line or high-performance computational services. PMID:22645531

  2. The iPlant Collaborative: Cyberinfrastructure for Plant Biology.

    Science.gov (United States)

    Goff, Stephen A; Vaughn, Matthew; McKay, Sheldon; Lyons, Eric; Stapleton, Ann E; Gessler, Damian; Matasci, Naim; Wang, Liya; Hanlon, Matthew; Lenards, Andrew; Muir, Andy; Merchant, Nirav; Lowry, Sonya; Mock, Stephen; Helmke, Matthew; Kubach, Adam; Narro, Martha; Hopkins, Nicole; Micklos, David; Hilgert, Uwe; Gonzales, Michael; Jordan, Chris; Skidmore, Edwin; Dooley, Rion; Cazes, John; McLay, Robert; Lu, Zhenyuan; Pasternak, Shiran; Koesterke, Lars; Piel, William H; Grene, Ruth; Noutsos, Christos; Gendler, Karla; Feng, Xin; Tang, Chunlao; Lent, Monica; Kim, Seung-Jin; Kvilekval, Kristian; Manjunath, B S; Tannen, Val; Stamatakis, Alexandros; Sanderson, Michael; Welch, Stephen M; Cranston, Karen A; Soltis, Pamela; Soltis, Doug; O'Meara, Brian; Ane, Cecile; Brutnell, Tom; Kleibenstein, Daniel J; White, Jeffery W; Leebens-Mack, James; Donoghue, Michael J; Spalding, Edgar P; Vision, Todd J; Myers, Christopher R; Lowenthal, David; Enquist, Brian J; Boyle, Brad; Akoglu, Ali; Andrews, Greg; Ram, Sudha; Ware, Doreen; Stein, Lincoln; Stanzione, Dan

    2011-01-01

    The iPlant Collaborative (iPlant) is a United States National Science Foundation (NSF) funded project that aims to create an innovative, comprehensive, and foundational cyberinfrastructure in support of plant biology research (PSCIC, 2006). iPlant is developing cyberinfrastructure that uniquely enables scientists throughout the diverse fields that comprise plant biology to address Grand Challenges in new ways, to stimulate and facilitate cross-disciplinary research, to promote biology and computer science research interactions, and to train the next generation of scientists on the use of cyberinfrastructure in research and education. Meeting humanity's projected demands for agricultural and forest products and the expectation that natural ecosystems be managed sustainably will require synergies from the application of information technologies. The iPlant cyberinfrastructure design is based on an unprecedented period of research community input, and leverages developments in high-performance computing, data storage, and cyberinfrastructure for the physical sciences. iPlant is an open-source project with application programming interfaces that allow the community to extend the infrastructure to meet its needs. iPlant is sponsoring community-driven workshops addressing specific scientific questions via analysis tool integration and hypothesis testing. These workshops teach researchers how to add bioinformatics tools and/or datasets into the iPlant cyberinfrastructure enabling plant scientists to perform complex analyses on large datasets without the need to master the command-line or high-performance computational services.

  3. The iPlant Collaborative: Cyberinfrastructure for Plant Biology

    Directory of Open Access Journals (Sweden)

    Stephen A Goff

    2011-07-01

    Full Text Available The iPlant Collaborative (iPlant is a United States National Science Foundation (NSF funded project that aims to create an innovative, comprehensive, and foundational cyberinfrastructure in support of plant biology research (PSCIC, 2006. iPlant is developing cyberinfrastructure that uniquely enables scientists throughout the diverse fields that comprise plant biology to address Grand Challenges in new ways, to stimulate and facilitate cross-disciplinary research, to promote biology and computer science research interactions, and to train the next generation of scientists on the use of cyberinfrastructure in research and education. Meeting humanity's projected demands for agricultural and forest products and the expectation that natural ecosystems be managed sustainably will require synergies from the application of information technologies. The iPlant cyberinfrastructure design is based on an unprecedented period of research community input, and leverages developments in high-performance computing, data storage, and cyberinfrastructure for the physical sciences. iPlant is an open-source project with application programming interfaces that allow the community to extend the infrastructure to meet its needs. iPlant is sponsoring community-driven workshops addressing specific scientific questions via analysis tool integration and hypothesis testing. These workshops teach researchers how to add bioinformatics tools and/or datasets into the iPlant cyberinfrastructure enabling plant scientists to perform complex analyses on large datasets without the need to master the command-line or high-performance computational services.

  4. Special Project Examination in Integrated Science - Ordinary Level.

    Science.gov (United States)

    Wimpenny, David

    A science achievement test for the General Certificate of Education (GCE, England) was developed for students enrolled in the curriculum of the Schools Council Integrated Science Project. This document contains discussions of the testing program and a copy of the 1973 test. After an overview of the curriculum project and issues related to…

  5. An Invasive Clonal Plant Benefits from Clonal Integration More than a Co-Occurring Native Plant in Nutrient-Patchy and Competitive Environments

    Science.gov (United States)

    You, Wenhua; Fan, Shufeng; Yu, Dan; Xie, Dong; Liu, Chunhua

    2014-01-01

    Many notorious invasive plants are clonal, however, little is known about the different roles of clonal integration effects between invasive and native plants. Here, we hypothesize that clonal integration affect growth, photosynthetic performance, biomass allocation and thus competitive ability of invasive and native clonal plants, and invasive clonal plants benefit from clonal integration more than co-occurring native plants in heterogeneous habitats. To test these hypotheses, two stoloniferous clonal plants, Alternanthera philoxeroides (invasive), Jussiaea repens (native) were studied in China. The apical parts of both species were grown either with or without neighboring vegetation and the basal parts without competitors were in nutrient- rich or -poor habitats, with stolon connections were either severed or kept intact. Competition significantly reduced growth and photosynthetic performance of the apical ramets in both species, but not the biomass of neighboring vegetation. Without competition, clonal integration greatly improved the growth and photosynthetic performance of both species, especially when the basal parts were in nutrient-rich habitats. When grown with neighboring vegetation, growth of J. repens and photosynthetic performance of both species were significantly enhanced by clonal integration with the basal parts in both nutrient-rich and -poor habitats, while growth and relative neighbor effect (RNE) of A. philoxeroides were greatly improved by clonal integration only when the basal parts were in nutrient-rich habitats. Moreover, clonal integration increased A. philoxeroides's biomass allocation to roots without competition, but decreased it with competition, especially when the basal ramets were in nutrient-rich sections. Effects of clonal integration on biomass allocation of J. repens was similar to that of A. philoxeroides but with less significance. These results supported our hypothesis that invasive clonal plants A. philoxeroides benefits

  6. Integrating data to acquire new knowledge: Three modes of integration in plant science.

    Science.gov (United States)

    Leonelli, Sabina

    2013-12-01

    This paper discusses what it means and what it takes to integrate data in order to acquire new knowledge about biological entities and processes. Maureen O'Malley and Orkun Soyer have pointed to the scientific work involved in data integration as important and distinct from the work required by other forms of integration, such as methodological and explanatory integration, which have been more successful in captivating the attention of philosophers of science. Here I explore what data integration involves in more detail and with a focus on the role of data-sharing tools, like online databases, in facilitating this process; and I point to the philosophical implications of focusing on data as a unit of analysis. I then analyse three cases of data integration in the field of plant science, each of which highlights a different mode of integration: (1) inter-level integration, which involves data documenting different features of the same species, aims to acquire an interdisciplinary understanding of organisms as complex wholes and is exemplified by research on Arabidopsis thaliana; (2) cross-species integration, which involves data acquired on different species, aims to understand plant biology in all its different manifestations and is exemplified by research on Miscanthus giganteus; and (3) translational integration, which involves data acquired from sources within as well as outside academia, aims at the provision of interventions to improve human health (e.g. by sustaining the environment in which humans thrive) and is exemplified by research on Phytophtora ramorum. Recognising the differences between these efforts sheds light on the dynamics and diverse outcomes of data dissemination and integrative research; and the relations between the social and institutional roles of science, the development of data-sharing infrastructures and the production of scientific knowledge. Copyright © 2013 Elsevier Ltd. All rights reserved.

  7. Requirement Volatility, Standardization and Knowledge Integration in Software Projects: An Empirical Analysis on Outsourced IS Development Projects

    Directory of Open Access Journals (Sweden)

    Rajesri Govindaraju

    2015-08-01

    Full Text Available Information systems development (ISD projects are highly complex, with different groups of people having  to collaborate and exchange their knowledge. Considering the intensity of knowledge exchange that takes place in outsourced ISD projects, in this study a conceptual model was developed, aiming to examine the influence of four antecedents, i.e. standardization, requirement volatility, internal integration, and external integration, on two dependent variables, i.e. process performance and product performance. Data  were collected from 46 software companies in four big cities in Indonesia. The collected data were examined to verify the proposed theoretical model using the partial least square structural equation modeling (PLS-SEM technique. The results show that process performance is significantly influenced by internal integration and standardization, while product performance is  significantly influenced by external integration and  requirement volatility. This study contributes  to a better understanding of how knowledge integration can be managed in outsourced ISD projects in view of increasing their success.

  8. Developing integrated parametric planning models for budgeting and managing complex projects

    Science.gov (United States)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  9. Plant integration of MITICA and SPIDER experiments with auxiliary plants and buildings on PRIMA site

    Energy Technology Data Exchange (ETDEWEB)

    Fellin, Francesco, E-mail: francesco.fellin@igi.cnr.it; Boldrin, Marco; Zaccaria, Pierluigi; Agostinetti, Piero; Battistella, Manuela; Bigi, Marco; Palma, Samuele Dal Bello Mauro Dalla; Fiorentin, Aldo; Luchetta, Adriano; Maistrello, Alberto; Marcuzzi, Diego; Ocello, Edoardo; Pasqualotto, Roberto; Pavei, Mauro; Pomaro, Nicola; Rizzolo, Andrea; Toigo, Vanni; Valente, Matteo; Zanotto, Loris; Calore, Luca; and others

    2015-10-15

    Highlights: • Focus on plant integration work supporting the realization of SPIDER and MITICA fusion experiments hosted in PRIMA buildings complex in Padova, Italy. • Huge effort of coordination and integration among many stakeholders, taking into account several constrains coming from experiments requirements (on-going) and precise time schedule and budget on buildings construction. • The paper also deals of interfaces management, coordination and integration of many competences, problems solving to find best solution also considering other aspects like safety and maintenance. - Abstract: This paper presents a description of the PRIMA (Padova Research on ITER Megavolt Accelerator) Plant Integration work, aimed at the construction of PRIMA Buildings, which will host two nuclear fusion test facilities named SPIDER and MITICA, finalized to test and optimize the neutral beam injectors for ITER experiment. These activities are very complex: inputs coming from the experiments design are changing time to time, while the buildings construction shall fulfill precise time schedule and budget. Moreover the decision process is often very long due to the high number of stakeholders (RFX, IO, third parties, suppliers, domestic agencies from different countries). The huge effort includes: forecasting what will be necessary for the integration of many experimental plants; collecting requirements and translating into inputs; interfaces management; coordination meetings with hundreds of people with various and different competences in construction and operation of fusion facilities, thermomechanics, electrical and control, buildings design and construction (civil plants plus architectural and structural aspects), safety, maintenance and management. The paper describes these activities and also the tools created to check and to validate the building design, to manage the interfaces and the organization put in place to achieve the required targets.

  10. Plant integration of MITICA and SPIDER experiments with auxiliary plants and buildings on PRIMA site

    International Nuclear Information System (INIS)

    Fellin, Francesco; Boldrin, Marco; Zaccaria, Pierluigi; Agostinetti, Piero; Battistella, Manuela; Bigi, Marco; Palma, Samuele Dal Bello Mauro Dalla; Fiorentin, Aldo; Luchetta, Adriano; Maistrello, Alberto; Marcuzzi, Diego; Ocello, Edoardo; Pasqualotto, Roberto; Pavei, Mauro; Pomaro, Nicola; Rizzolo, Andrea; Toigo, Vanni; Valente, Matteo; Zanotto, Loris; Calore, Luca

    2015-01-01

    Highlights: • Focus on plant integration work supporting the realization of SPIDER and MITICA fusion experiments hosted in PRIMA buildings complex in Padova, Italy. • Huge effort of coordination and integration among many stakeholders, taking into account several constrains coming from experiments requirements (on-going) and precise time schedule and budget on buildings construction. • The paper also deals of interfaces management, coordination and integration of many competences, problems solving to find best solution also considering other aspects like safety and maintenance. - Abstract: This paper presents a description of the PRIMA (Padova Research on ITER Megavolt Accelerator) Plant Integration work, aimed at the construction of PRIMA Buildings, which will host two nuclear fusion test facilities named SPIDER and MITICA, finalized to test and optimize the neutral beam injectors for ITER experiment. These activities are very complex: inputs coming from the experiments design are changing time to time, while the buildings construction shall fulfill precise time schedule and budget. Moreover the decision process is often very long due to the high number of stakeholders (RFX, IO, third parties, suppliers, domestic agencies from different countries). The huge effort includes: forecasting what will be necessary for the integration of many experimental plants; collecting requirements and translating into inputs; interfaces management; coordination meetings with hundreds of people with various and different competences in construction and operation of fusion facilities, thermomechanics, electrical and control, buildings design and construction (civil plants plus architectural and structural aspects), safety, maintenance and management. The paper describes these activities and also the tools created to check and to validate the building design, to manage the interfaces and the organization put in place to achieve the required targets.

  11. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  12. Integral Histogram with Random Projection for Pedestrian Detection.

    Directory of Open Access Journals (Sweden)

    Chang-Hua Liu

    Full Text Available In this paper, we give a systematic study to report several deep insights into the HOG, one of the most widely used features in the modern computer vision and image processing applications. We first show that, its magnitudes of gradient can be randomly projected with random matrix. To handle over-fitting, an integral histogram based on the differences of randomly selected blocks is proposed. The experiments show that both the random projection and integral histogram outperform the HOG feature obviously. Finally, the two ideas are combined into a new descriptor termed IHRP, which outperforms the HOG feature with less dimensions and higher speed.

  13. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  14. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  15. Role of plant pathology in integrated pest management.

    Science.gov (United States)

    Jacobsen, B J

    1997-01-01

    Integrated Pest Management (IPM) is a paradigm that is widely adopted by all pest control disciplines but whose early definitions and philosophical basis belong to entomologists. Plant pathology research and extension work has historically emphasized integration of several control strategies and fits both historical and modern definitions of IPM. While the term IPM has been used only sparingly in the phytopathology literature, the integrated disease management strategies emphasized are now considered to be at the forefront of ecologically based or biointensive pest management. While IPM is broadly endorsed by crop protection disciplines, farmers, other agriculturalists, and consumers, the potential for Integrated Pest Management has not been fully realized. Most IPM programs reflect a package of tools and decision aids for individual crop insect, weed, nematode, and plant disease management. IPM programs that integrate all types of pests with the agroecosystem, crop growth and loss models still await the formation of interdisciplinary teams focusing on growers needs. Lack of funding for both discipline and interdisciplinary developmental research and implementation is responsible for the paucity of comprehensive IPM programs for the majority of the U.S. crop acreage. This review explores the origins and evolution of the IPM paradigm and reviews efforts to achieve the body of knowledge and implementation structure to achieve IPM's full potential.

  16. Digital Display Integration Project Project Online 2.0

    International Nuclear Information System (INIS)

    Bardsley, J. N.

    1999-01-01

    The electronic display industry is changing in three important ways. First, the dominance of the cathode ray tube (CRT) is being challenged by the development of flat panel displays (FPDs). This will lead to the availability of displays of higher performance, albeit at greater cost. Secondly, the analog interfaces between displays that show data and the computers that generate the data are being replaced by digital connections. Finally, a high-resolution display is becoming the most expensive component in computer system for homes and small offices. It is therefore desirable that the useful lifetime of the display extend over several years and that the electronics allows the display to be used with many different image sources. Hopefully, the necessity of having three or four large CRTs in one office to accommodate different computer operating systems or communication protocols will soon disappear. Instead, we hope to see a set of flat panels that can be switched to show several independent images from multiple sources or a composite image from a single source. The more rapid rate of technological improvements and the higher cost of flat panel displays raise the incentive for greater planning and guidance in the acquisition and integration of high performance displays into large organizations, such as LLNL. The goal of the Digital Display Integration Project (DDIP) is to provide such support. This will be achieved through collaboration with leading suppliers of displays, communications equipment and image-processing products, and by greater exchange of information within the Laboratory. The project will start in October 1999. During the first two years (FY2000-1), the primary focus of the program will be upon: introducing displays with high information content (over 5M pixels); facilitating the transition from analog to digital interfaces; enabling data transfer from key computer platforms; incorporating optical communications to remove length restrictions on data

  17. VIRTUAL REALITY-BASED CLOUD BIM PLATFORM FOR INTEGRATED AEC PROJECTS

    OpenAIRE

    Goulding, Jack Steven; Pour Rahimian Leilabadi, Farzad; Wang, Xiangyu

    2014-01-01

    Building Information Modelling (BIM) has demonstrated the need for integrating collaborative design teams’ “project data”, to not only help coordinate the design, engineering, fabrication, construction, and maintenance of various trades, but also facilitate project integration and interchange. Numerous potential benefits have inspired several countries to consider the implications of implementing BIM Level 3 (Cloud) as an innovative way of further enhancing the design, management and delivery...

  18. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  19. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  20. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  1. Management and integration of engineering and construction activities: Lessons learned from the AP1000R nuclear power plant China project

    International Nuclear Information System (INIS)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-01-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  2. Analysis of Conflict Centers in Projects Procured with Traditional and Integrated Methods in Nigeria

    Directory of Open Access Journals (Sweden)

    Martin O. Dada

    2012-07-01

    Full Text Available Conflicts in any organization can either be functional or dysfunctional and can contribute to or detract from the achievement of organizational or project objectives. This study investigated the frequency and intensity of conflicts, using five conflict centers, on projects executed with either the integrated or traditional method in Nigeria. Questionnaires were administered through purposive and snowballing techniques on 274 projects located in twelve states of Nigeria and Abuja. 94 usable responses were obtained. The collected data were subjected to both descriptive and inferential statistical analysis. In projects procured with traditional methods, conflicts relating to resources for project execution had the greatest frequency, while conflicts around project/client goals had the least frequency. For projects executed with integrated methods, conflicts due to administrative procedures were ranked highest while conflicts due to project/client goals were ranked least. Regarding seriousness of conflict, conflicts due to administrative procedures and resources for project execution were ranked highest respectively for projects procured with traditional and integrated methods. Additionally, in terms of seriousness, personality issues and project/client goals were the least sources of conflict in projects executed with traditional and integrated methods. There were no significant differences in the incidence of conflicts, using the selected conflict centers, between the traditional and integrated procurement methods. There was however significant difference in the intensity or seriousness of conflicts between projects executed with the traditional method and those executed with integrated methods in the following areas: technical issues, administrative matters and personality issues. The study recommends that conscious efforts should be made at teambuilding on projects executed with integrated methods.

  3. Collaborative Project-Based Learning: An Integrative Science and Technological Education Project

    Science.gov (United States)

    Baser, Derya; Ozden, M. Yasar; Karaarslan, Hasan

    2017-01-01

    Background: Blending collaborative learning and project-based learning (PBL) based on Wolff (2003) design categories, students interacted in a learning environment where they developed their technology integration practices as well as their technological and collaborative skills. Purpose: The study aims to understand how seventh grade students…

  4. The integrated in situ testing program for the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Matalucci, R.V.

    1987-03-01

    The US Department of Energy (DOE) is developing the Waste Isolation Pilot Plant (WIPP) Project in southeastern New Mexico as a research and development (R and D) facility for examining the response of bedded (layered) salt to the emplacement of radioactive wastes generated from defense programs. The WIPP Experimental Program consists of a technology development program, including laboratory testing and theoretical analysis activities, and an in situ testing program that is being done 659 m underground at the project site. This experimental program addresses three major technical areas that concern (1) thermal/structural interactions, (2) plugging and sealing, and (3) waste package performance. To ensure that the technical issues involved in these areas are investigated with appropriate emphasis and timing, an in situ testing plan was developed to integrate the many activities and tasks associated with the technical issues of waste disposal. 5 refs., 4 figs

  5. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  6. Educational integrating projects as a method of interactive learning

    Directory of Open Access Journals (Sweden)

    Иван Николаевич Куринин

    2013-12-01

    Full Text Available The article describes a method of interactive learning based on educational integrating projects. Some examples of content of such projects for the disciplines related to the study of information and Internet technologies and their application in management are presented.

  7. Dominant integration locus drives continuous diversification of plant immune receptors with exogenous domain fusions.

    Science.gov (United States)

    Bailey, Paul C; Schudoma, Christian; Jackson, William; Baggs, Erin; Dagdas, Gulay; Haerty, Wilfried; Moscou, Matthew; Krasileva, Ksenia V

    2018-02-19

    The plant immune system is innate and encoded in the germline. Using it efficiently, plants are capable of recognizing a diverse range of rapidly evolving pathogens. A recently described phenomenon shows that plant immune receptors are able to recognize pathogen effectors through the acquisition of exogenous protein domains from other plant genes. We show that plant immune receptors with integrated domains are distributed unevenly across their phylogeny in grasses. Using phylogenetic analysis, we uncover a major integration clade, whose members underwent repeated independent integration events producing diverse fusions. This clade is ancestral in grasses with members often found on syntenic chromosomes. Analyses of these fusion events reveals that homologous receptors can be fused to diverse domains. Furthermore, we discover a 43 amino acid long motif associated with this dominant integration clade which is located immediately upstream of the fusion site. Sequence analysis reveals that DNA transposition and/or ectopic recombination are the most likely mechanisms of formation for nucleotide binding leucine rich repeat proteins with integrated domains. The identification of this subclass of plant immune receptors that is naturally adapted to new domain integration will inform biotechnological approaches for generating synthetic receptors with novel pathogen "baits."

  8. Plant Biology and Biogeochemistry Department annual project report 1999

    DEFF Research Database (Denmark)

    Jensen, A.; Gissel Nielsen, G.; Giese, H.

    2000-01-01

    The Department of Plant Biology and Biogeochemistry is engaged in basic and applied research to improve the scientific knowledge of developing new methods and technology for the future, environmentally benign industrial and agricultural production, thusexerting less stress and strain...... of Biomass, 3. DLF-Risø Biotechnology, 4. Plant Genetics and Epidemiology, 5. Biogeochemistry and 6. Plant Ecosystems and Nutrient Cycling. This electronicversion of the annual report from the Plant Biology and Biogeochemistry Department aims to provide information about the progress in our research. Each...... on the environment. This knowledge will lead to a greater prosperity and welfare for agriculture, industry and consumers in Denmark. The research approach in the Department is mainly experimental and the projects areorganized in six research programmes: 1. Plant-Microbe Symbioses, 2. Plant Products and Recycling...

  9. Economical aspects of a nuclear power plant project

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Santos, E.M. dos

    1992-01-01

    This work describes different aspects and parameters that should be regarded as guidelines for economic evaluation of small and medium power plant projects. The main objective of an economic evaluation is to establish the plant's unitary cost and its economic figure of merit. To achieve that, a number of studies must be undertaken to compare the global competitiveness of a nuclear power plant with other energetic alternatives. These studies involve macro economy, energy generation, electricity transmission and global feasibility of the enterprise. It is concluded that the economic evaluation of a nuclear power plant should be considered as the culmination of a long process of planning at a national level. The main reasons are the investments involved, the technological developments required and political implications of the utilization of nuclear power energy. (author)

  10. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  11. Conceptual project of waste treatment plant of CDTN

    International Nuclear Information System (INIS)

    Gabriel, J.L.; Astolfi, D.

    1983-01-01

    This paper presents the conceptual project of the waste treatment plant of CDTN. Several areas, such as: process area, material entrance and exit area are studied. The treatment processes are: evaporation, filtration, cementation, cutting and processing of solid wastes. (C.M.)

  12. Guide for prioritizing power plant productivity improvement projects: handbook of availability improvement methodology

    International Nuclear Information System (INIS)

    1981-01-01

    As part of its program to help improve electrical power plant productivity, the Department of Energy (DOE) has developed a methodology for evaluating productivity improvement projects. This handbook presents a simplified version of this methodology called the Availability Improvement Methodology (AIM), which provides a systematic approach for prioritizing plant improvement projects. Also included in this handbook is a description of data taking requirements necessary to support the AIM methodology, benefit/cost analysis, and root cause analysis for tracing persistent power plant problems. In applying the AIM methodology, utility engineers should be mindful that replacement power costs are frequently greater for forced outages than for planned outages. Equivalent availability includes both. A cost-effective ranking of alternative plant improvement projects must discern between those projects which will reduce forced outages and those which might reduce planned outages. As is the case with any analytical procedure, engineering judgement must be exercised with respect to results of purely mathematical calculations

  13. Performance Criteria of Spatial Development Projects Based on Interregional Integration

    Directory of Open Access Journals (Sweden)

    Elena Viktorovna Kurushina

    2018-03-01

    Full Text Available The search of efficient ways for the development of regional socio-economic space is a relevant problem. The authors consider the models of spatial organization according to the Spatial Development Strategy of the Russian Federation until 2030. We conduct the comparative analysis of scenarios for the polarized and diversified spatial growth. Many investigations consider the concepts of polarized and endogenous growth. This study proposes a methodology to assess the development of macroregions and to increase the viability of interregional integration projects. To develop this methodology, we formulate scientific principles and indirect criteria of the project performance conforming to the theory of regional integration. In addition to the territorial community and complementarity of the development potentials, regional integration in the country should be based on the principles of security, networking, limited quantity and awareness of the potential project participants. Integration should ensure synergetic effects and take into account cultural and historical closeness, that manifests in the common mentality and existing economic relations among regions. The calculation results regarding the indirect criteria are obtained using the methods of classification and spatial correlation. This study confirms the hypothesis, that the formation of the Western Siberian and Ural macro-regions is appropriate. We have concluded this on the basis of the criteria of economic development, economic integration, the similarity of regional spaces as habitats, and a number of participants for the subjects of the Ural Federal District. The projection of the patterns of international economic integration to the interregional level allows predicting the highest probability for the successful cooperation among the Western Siberian regions with a high level of economic development. The authors’ method has revealed a high synchronization between the economies of

  14. Purposes and related aspects of the nuclear power plant aging Project

    International Nuclear Information System (INIS)

    Garaud, J.; Reynes, L.; Montardy, A. de

    1989-01-01

    The purposes and some aspects of the nuclear power plant Lifetime project is presented. The work is focused on the study of the aging of the PWR type power plant components. The project consists in two phases. The first one involves: the status reports and the analysis of the lifetime data of the most sensitive units, as well as the applied actions and proposals, the influence of the exploitation modes, the safety and the cost prospectives. The second phase includes: the definition, the contracts, the complementary actions and their achievement, the reasons and the surveyance improvements, the development of the decision supporting means, the summary and the conclusions. The selected units for the project first step and the project of actions, are listed. The first conclusions of the project show that most of the 900 MW PWR reactor components will have about 40 years of service life [fr

  15. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  16. Integrated plant safety assessment. Systematic evaluation program, Big Rock Point Plant (Docket No. 50-155). Final report

    International Nuclear Information System (INIS)

    1984-05-01

    The Systematic Evaluation Program was initiated in February 1977 by the U.S. Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety when the supplement to the Final Integrated Plant Safety Assessment Report has been issued. This report documents the review of the Big Rock Point Plant, which is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. It also addresses a majority of the pending licensing actions for Big Rock Point, which include TMI Action Plan requirements and implementation criteria for resolved generic issues. Equipment and procedural changes have been identified as a result of the review

  17. General criteria for the project of nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    1979-01-01

    Recommendations are presented establishing the general criteria for the project of nuclear fuel reprocessing plants to be licensed according to the legislation in effect. They apply to all the plant's systems, components and structures which are important to operation safety and to the public's health and safety. (F.E.) [pt

  18. ITER Construction--Plant System Integration

    International Nuclear Information System (INIS)

    Tada, E.; Matsuda, S.

    2009-01-01

    This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

  19. Municipal Solid Waste Gasification Plant Integrated With SOFC and Gas Turbine

    DEFF Research Database (Denmark)

    Bellomare, Filippo; Rokni, Masoud

    2012-01-01

    An interesting source of producing energy with low pollutants emission and reduced environmental impact are the biomasses; particularly using Municipal Solid Waste (MSW) as fuel, can be a competitive solution not only to produce energy with negligible costs but also to decrease the storage...... in landfills. A Municipal Solid Waste Gasification Plant Integrated with Solid Oxide Fuel Cell (SOFC) and Gas Turbine (GT) has been studied and the plant is called IGSG (Integrated Gasification SOFC and GT). Gasification plant is fed by MSW to produce syngas by which the anode side of a SOFC is fed wherein...

  20. The waste isolation pilot plant project: a changing paradigm

    International Nuclear Information System (INIS)

    Sheppard, L.E.; McFadden, M.H.

    1996-01-01

    The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy (DOE) repository that has been developed to demonstrate the safe and permanent isolation of transuranic radioactive wastes in a deep geologic site. It is located in 650 m below the surface in a bedded salt formation, and is designed to hold approximately 175,500 cubic meters of waste. Compliance with the regulations has become the principal focus for the Project. The scientific baseline is an important and integral part of the CCA, as it provides the foundation for conducting total system performance assessment calculations for comparison with applicable standards. The activities required to support the scientific baseline are being pursued in parallel to minimize the time required to collect, analyze, interpret and fully incorporate the results into the CCA. The DOE has shifted its approach to demonstrating compliance with the applicable regulations from a paradigm of a series of broad investigations to a new paradigm of highly focused activities conducted in parallel. The success of this approach will be assessed by the EPA when the application is critically reviewed

  1. Project finance and photovoltaic power plants : a theoretical and practical perspective

    OpenAIRE

    Aasgaard, Anne Kristine

    2010-01-01

    Project finance is a defined structure for developing new activity which involves establishing the project as a separate unit. The review of literature exhibits the distinctive characteristics of project finance and provides a rationale of this form of financing. Project finance entails financial modelling, risk management, legal aspects and the creation of a financial structure. The thesis explores practical use of project finance in a case study of a photovoltaic power plant and presents a ...

  2. Design concept and its requirements of the integrated SMART nuclear desalination plant

    International Nuclear Information System (INIS)

    Hwang, Young Dong; Kim, Young In; Chon, Bong Hyun; Lee, Doo Jung; Chang, Moon Hee

    2001-02-01

    The integrated SMART desalination plant consists of four(4) units of Multi Effect Distillation Process combined with Thermal-Vapor Compressor(MED-TVC) and coupled with the extracted steam from turbine through the steam transformer. Steam transformer produces the main pressure steam and supplies to the MED-TVC unit. Each distillation unit has the production the capacity of 10,000 m3/day of distilled water per day at top brine temperature of 65 deg C using the seawater supplied at temperature of 33 deg C. MED-TVC was selected as a desalination process coupled with SMART, since the thermal vapor compression is very effective where the steam is available at high temperature and pressure conditions than required in the evaporator. The MED-TVC unit is consisted of the steam supply system, vapor and condensate system, seawater supply system, brine system and chemical dosing system. The standard design of the SMART desalination plant is under development as a part of the SMART project. This report describes design concept of these systems and their requirements

  3. Design concept and its requirements of the integrated SMART nuclear desalination plant

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Young Dong; Kim, Young In; Chon, Bong Hyun; Lee, Doo Jung; Chang, Moon Hee

    2001-02-01

    The integrated SMART desalination plant consists of four(4) units of Multi Effect Distillation Process combined with Thermal-Vapor Compressor(MED-TVC) and coupled with the extracted steam from turbine through the steam transformer. Steam transformer produces the main pressure steam and supplies to the MED-TVC unit. Each distillation unit has the production the capacity of 10,000 m3/day of distilled water per day at top brine temperature of 65 deg C using the seawater supplied at temperature of 33 deg C. MED-TVC was selected as a desalination process coupled with SMART, since the thermal vapor compression is very effective where the steam is available at high temperature and pressure conditions than required in the evaporator. The MED-TVC unit is consisted of the steam supply system, vapor and condensate system, seawater supply system, brine system and chemical dosing system. The standard design of the SMART desalination plant is under development as a part of the SMART project. This report describes design concept of these systems and their requirements.

  4. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  5. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  6. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  7. Integrated learning of mathematics, science and technology concepts through LEGO/Logo projects

    Science.gov (United States)

    Wu, Lina

    This dissertation examined integrated learning in the domains of mathematics, science and technology based on Piaget's constructivism, Papert's constructionism, and project-based approach to education. Ten fifth grade students were involved in a two-month long after school program where they designed and built their own computer-controlled LEGO/Logo projects that required the use of gears, ratios and motion concepts. The design of this study centered on three notions of integrated learning: (1) integration in terms of what educational materials/settings provide, (2) integration in terms of students' use of those materials, and (3) integration in the psychological sense. In terms of the first notion, the results generally showed that the LEGO/Logo environment supported the integrated learning of math, science and technology concepts. Regarding the second notion, the students all completed impressive projects of their own design. They successfully combined gears, motors, and LEGO parts together to create motion and writing control commands to manipulate the motion. But contrary to my initial expectations, their successful designs did not require numerical reasoning about ratios in designing effective gear systems. When they did reason about gear relationships, they worked with "qualitative" ratios, e.g., "a larger driver gear with a smaller driven gear increases the speed." In terms of the third notion of integrated learning, there was evidence in all four case study students of the psychological processes involved in linking mathematical, scientific, and/or technological concepts together to achieve new conceptual units. The students not only made connections between ideas and experiences, but also recognized decisive patterns and relationships in their project work. The students with stronger overall project performances showed more evidence of synthesis than the students with relatively weaker performances did. The findings support the conclusion that all three

  8. Project Integration Architecture: Inter-Application Propagation of Information

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    A principal goal of the Project Integration Architecture (PIA) is to facilitate the meaningful inter-application transfer of application-value-added information. Such exchanging applications may be largely unrelated to each other except through their applicability to an overall project; however, the PIA effort recognizes as fundamental the need to make such applications cooperate despite wide disparaties either in the fidelity of the analyses carried out, or even the disciplines of the analysis. This paper discusses the approach and techniques applied and anticipated by the PIA project in treating this need.

  9. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-01

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage

  10. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  11. Demonstration of IGCC features - plant integration and syngas combustion

    Energy Technology Data Exchange (ETDEWEB)

    Hannemann, F.; Huth, M.; Karg, J.; Schiffers, U. [Siemens AG Power Generation (KWU), Erlanger/Muelheim (Germany)

    2000-07-01

    Siemens is involved in three IGCC plants in Europe that are currently in operation. Against the background of the Puertollano and Buggenum plants, some of the specific new features of fully integrated IGCC power plants are discussed, including: requirements and design features of the gas turbine syngas supply system; gas turbine operating experience with air extraction for the air separation unit from the gas turbine air compressor; and design requirements and operational features of the combustion system. 7 refs., 17 figs., 1 tab.

  12. Managing externally financed projects: the Integrated Primary Health Care Project in Bolivia.

    Science.gov (United States)

    Homedes, N

    2001-12-01

    Bolivia is one of the poorest countries in Latin America. Health indicators are very poor, communicable diseases are prevalent and, coupled with malnutrition, remain the major killers of children under 5 years old. The Integrated Primary Health Care Project (PROISS) was a US$39 million project executed by the Ministry of Health (MOH), 50% financed by the World Bank and aimed at improving primary health care in the four largest Bolivian municipalities. The implementation of the project started in 1990 and ended in 1997. During implementation it went through three distinct phases: Phase 1 (1990-94) was a period characterized by conflict and confusion; Phase 2 (1995-mid-1996) documented major improvements in coverage and service quality; and Phase 3 (mid-1996-97) witnessed the decline of the project. This paper explores the factors that contributed to the success and the decline of the project, draws lessons for project managers and international agencies involved in the definition and implementation of social sector projects, and discusses the unlikelihood that externally financed projects can have a sustainable impact on the development of the health sector of recipient countries.

  13. Integrating Project Portfolio With Business Strategy: Imagineering

    Directory of Open Access Journals (Sweden)

    Cesar Buaes Dal Maso

    2015-12-01

    Full Text Available Aligning project management to the strategy of a big company is a difficult job. Through Imagineering (the business department and project management program, The Walt Disney Company has done this alignment in an exemplary way. Using a theoretical investigation, this study analyzed the Imagineering as a reference in strategic management of global projects through Disney´s business portfolio, a global benchmarking and with Malmberg et al. (2010 as a company guide. As the main results of the correlations carried out, it was noted that the Imagineers who work in project teams apply tools and techniques with a strategic vision focused on differentiation, generating value, and mixing imagination with technical capacity. The Blue Sky department and its integrated units make possible the creation and deployment of the attractions, the theme parks, hotels, resorts and the Disney sea cruises, demonstrating in this way, to be a highly effective project management office.

  14. Approaches to Teaching Plant Nutrition. Children's Learning in Science Project.

    Science.gov (United States)

    Leeds Univ. (England). Centre for Studies in Science and Mathematics Education.

    During the period 1984-1986, over 30 teachers from the Yorkshire (England) region have worked in collaboration with the Children's Learning in Science Project (CLIS) developing and testing teaching schemes in the areas of energy, particle theory, and plant nutrition. The project is based upon the constructivist approach to teaching. This document…

  15. Progress of the Enhanced Hanford Single Shell Tank (SST) Integrity Project

    Energy Technology Data Exchange (ETDEWEB)

    Venetz, Theodore J. [Washington River Protection Solutions, Richland, WA (United States); Washenfelder, Dennis J. [Washington River Protection Solutions, Richland, WA (United States); Boomer, Kayle D. [Washington River Protection Solutions, Richland, WA (United States); Johnson, Jeremy M. [USDOE Office of River Protection, Richland, WA (United States); Castleberry, Jim L. [Washington River Protection Solutions, Richland, WA (United States)

    2015-01-07

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement.

  16. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  17. Microwave solidification project overview

    Energy Technology Data Exchange (ETDEWEB)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  18. Microwave solidification project overview

    International Nuclear Information System (INIS)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included

  19. Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Britt, Phillip F [ORNL

    2015-03-01

    Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report. Summaries of conclusions, analytical processes, and analytical results. Analysis of samples taken from the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico in support of the WIPP Technical Assessment Team (TAT) activities to determine to the extent feasible the mechanisms and chemical reactions that may have resulted in the breach of at least one waste drum and release of waste material in WIPP Panel 7 Room 7 on February 14, 2014. This report integrates and summarizes the results contained in three separate reports, described below, and draws conclusions based on those results. Chemical and Radiochemical Analyses of WIPP Samples R-15 C5 SWB and R16 C-4 Lip; PNNL-24003, Pacific Northwest National Laboratory, December 2014 Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL); SRNL-STI-2014-00617; Savannah River National Laboratory, December 2014 Report for WIPP UG Sample #3, R15C5 (9/3/14); LLNL-TR-667015; Lawrence Livermore National Laboratory, January 2015 This report is also contained in the Waste Isolation Pilot Plant Technical Assessment Team Report; SRNL-RP-2015-01198; Savannah River National Laboratory, March 17, 2015, as Appendix C: Analysis Integrated Summary Report.

  20. Location optimization of solar plants by an integrated hierarchical DEA PCA approach

    International Nuclear Information System (INIS)

    Azadeh, A.; Ghaderi, S.F.; Maghsoudi, A.

    2008-01-01

    Unique features of renewable energies such as solar energy has caused increasing demands for such resources. In order to use solar energy as a natural resource, environmental circumstances and geographical location related to solar intensity must be considered. Different factors may affect on the selection of a suitable location for solar plants. These factors must be considered concurrently for optimum location identification of solar plants. This article presents an integrated hierarchical approach for location of solar plants by data envelopment analysis (DEA), principal component analysis (PCA) and numerical taxonomy (NT). Furthermore, an integrated hierarchical DEA approach incorporating the most relevant parameters of solar plants is introduced. Moreover, 2 multivariable methods namely, PCA and NT are used to validate the results of DEA model. The prescribed approach is tested for 25 different cities in Iran with 6 different regions within each city. This is the first study that considers an integrated hierarchical DEA approach for geographical location optimization of solar plants. Implementation of the proposed approach would enable the energy policy makers to select the best-possible location for construction of a solar power plant with lowest possible costs

  1. Integrated Data Base: Status and waste projections

    International Nuclear Information System (INIS)

    Klein, J.A.

    1990-01-01

    The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. DOE low-level waste (LLW) is just one of the many waste types that are documented with the IDB. Summary-level tables and figures are presented illustrating historical and projected volume changes of DOE LLW. This information is readily available through the annual IDB publication. Other presentation formats are also available to the DOE community through a request to the IDB Program. 4 refs., 6 figs., 5 tabs

  2. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  3. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  4. Project management in fossil plant construction: A perspective for the Nineties

    International Nuclear Information System (INIS)

    Bhatia, N.K.

    1991-01-01

    The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model

  5. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    Energy Technology Data Exchange (ETDEWEB)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  6. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  7. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  8. Data-driven modelling of structured populations a practical guide to the integral projection model

    CERN Document Server

    Ellner, Stephen P; Rees, Mark

    2016-01-01

    This book is a “How To” guide for modeling population dynamics using Integral Projection Models (IPM) starting from observational data. It is written by a leading research team in this area and includes code in the R language (in the text and online) to carry out all computations. The intended audience are ecologists, evolutionary biologists, and mathematical biologists interested in developing data-driven models for animal and plant populations. IPMs may seem hard as they involve integrals. The aim of this book is to demystify IPMs, so they become the model of choice for populations structured by size or other continuously varying traits. The book uses real examples of increasing complexity to show how the life-cycle of the study organism naturally leads to the appropriate statistical analysis, which leads directly to the IPM itself. A wide range of model types and analyses are presented, including model construction, computational methods, and the underlying theory, with the more technical material in B...

  9. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  10. The Kembs project: environmental integration of a large existing hydropower scheme

    International Nuclear Information System (INIS)

    Garnier, Alain; Barillier, Agnes

    2015-01-01

    The environment was a major issue for the Kembs re-licensing process on the upper Rhine River. Since 1932, Kembs dam derives water from the Rhine River to the 'Grand Canal d'Alsace' (GCA) which is equipped with four hydropower plants (max. diverted flow: 1400 m 3 /s, 630 MW, 3760 GWh/y). The Old Rhine River downstream of the dam is 50 km long and has been strongly affected by works (dikes) since the 19. century for flood protection and navigation, and then by the construction of the dam. Successive engineering works induced morphological simplification and stabilization of the channel pattern from a formerly braided form to a single incised channel, generating ecological alterations. As the Kembs hydroelectric scheme concerns three countries (France, Germany and Switzerland) with various regulations and views on how to manage with environment, EDF undertook an integrated environmental approach instead of a strict 'impact/mitigation' balance that took 10 years to develop. Therefore, the project simultaneously acts on complementary compartments of the aquatic, riparian and terrestrial environment, to benefit from the synergies that exist between them; a new power plant (8,5 MW, 28 GWh/y) is built to limit the energetic losses and to ensure various functions thereby increasing the overall environmental gain. (authors)

  11. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  12. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  13. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  14. B Plant low level waste system integrity assessment report

    International Nuclear Information System (INIS)

    Walter, E.J.

    1995-09-01

    This document provides the report of the integrity assessment activities for the B Plant low level waste system. The assessment activities were in response to requirements of the Washington State Dangerous Waste Regulations, Washington Administrative Code (WAC), 173-303-640. This integrity assessment report supports compliance with Hanford Federal Facility Agreement and Consent Order interim milestone target action M-32-07-T03

  15. Integrated online condition monitoring system for nuclear power plants

    International Nuclear Information System (INIS)

    Hashemian, Hashem M.

    2010-01-01

    Online condition monitoring or online monitoring (OLM) uses data acquired while a nuclear power is operating to continuously assess the health of the plant's sensors, processes, and equipment; to measure the dynamic performance of the plant's process instrumentation; to verify in-situ the calibration of the process instrumentation; to detect blockages, voids, and leaks in the pressure sensing lines; to identify core flow anomalies; to extend the life of neutron detectors and other sensors; and to measure the vibration of reactor internals. Both the steady-state or DC output of plant sensors and their AC signal or noise output can be used to assess sensor health, depending on whether the application is monitoring a rapidly changing (e.g., core barrel motion) or a slowly changing (e.g., sensor calibration) process. The author has designed, developed, installed, and tested OLM systems (comprised of software/hardware-based data acquisition and data processing modules) that integrate low-frequency (1 mHz to 1 Hz) techniques such as RTD cross-calibration, pressure transmitter calibration monitoring, and equipment condition monitoring and high-frequency (1 Hz to 1 kHz) techniques such as the noise analysis technique. The author has demonstrated the noise analysis technique's effectiveness for measuring the dynamic response-time of pressure transmitters and their sensing lines; for performing predictive maintenance on reactor internals; for detecting core flow anomalies; and for extending neutron detector life. Integrated online condition monitoring systems can combine AC and DC data acquisition and signal processing techniques, can use data from existing process sensors during all modes of plant operation, including startup, normal operation, and shutdown; can be retrofitted into existing PWRs, BWRs, and other reactor types and will be integrated into next-generation plants. (orig.)

  16. Integrated online condition monitoring system for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hashemian, Hashem M. [Analysis and Measurement Services Corporation, Knoxville, TN (United States). AMS Technology Center

    2010-09-15

    Online condition monitoring or online monitoring (OLM) uses data acquired while a nuclear power is operating to continuously assess the health of the plant's sensors, processes, and equipment; to measure the dynamic performance of the plant's process instrumentation; to verify in-situ the calibration of the process instrumentation; to detect blockages, voids, and leaks in the pressure sensing lines; to identify core flow anomalies; to extend the life of neutron detectors and other sensors; and to measure the vibration of reactor internals. Both the steady-state or DC output of plant sensors and their AC signal or noise output can be used to assess sensor health, depending on whether the application is monitoring a rapidly changing (e.g., core barrel motion) or a slowly changing (e.g., sensor calibration) process. The author has designed, developed, installed, and tested OLM systems (comprised of software/hardware-based data acquisition and data processing modules) that integrate low-frequency (1 mHz to 1 Hz) techniques such as RTD cross-calibration, pressure transmitter calibration monitoring, and equipment condition monitoring and high-frequency (1 Hz to 1 kHz) techniques such as the noise analysis technique. The author has demonstrated the noise analysis technique's effectiveness for measuring the dynamic response-time of pressure transmitters and their sensing lines; for performing predictive maintenance on reactor internals; for detecting core flow anomalies; and for extending neutron detector life. Integrated online condition monitoring systems can combine AC and DC data acquisition and signal processing techniques, can use data from existing process sensors during all modes of plant operation, including startup, normal operation, and shutdown; can be retrofitted into existing PWRs, BWRs, and other reactor types and will be integrated into next-generation plants. (orig.)

  17. Theory, modeling, and integrated studies in the Arase (ERG) project

    Science.gov (United States)

    Seki, Kanako; Miyoshi, Yoshizumi; Ebihara, Yusuke; Katoh, Yuto; Amano, Takanobu; Saito, Shinji; Shoji, Masafumi; Nakamizo, Aoi; Keika, Kunihiro; Hori, Tomoaki; Nakano, Shin'ya; Watanabe, Shigeto; Kamiya, Kei; Takahashi, Naoko; Omura, Yoshiharu; Nose, Masahito; Fok, Mei-Ching; Tanaka, Takashi; Ieda, Akimasa; Yoshikawa, Akimasa

    2018-02-01

    Understanding of underlying mechanisms of drastic variations of the near-Earth space (geospace) is one of the current focuses of the magnetospheric physics. The science target of the geospace research project Exploration of energization and Radiation in Geospace (ERG) is to understand the geospace variations with a focus on the relativistic electron acceleration and loss processes. In order to achieve the goal, the ERG project consists of the three parts: the Arase (ERG) satellite, ground-based observations, and theory/modeling/integrated studies. The role of theory/modeling/integrated studies part is to promote relevant theoretical and simulation studies as well as integrated data analysis to combine different kinds of observations and modeling. Here we provide technical reports on simulation and empirical models related to the ERG project together with their roles in the integrated studies of dynamic geospace variations. The simulation and empirical models covered include the radial diffusion model of the radiation belt electrons, GEMSIS-RB and RBW models, CIMI model with global MHD simulation REPPU, GEMSIS-RC model, plasmasphere thermosphere model, self-consistent wave-particle interaction simulations (electron hybrid code and ion hybrid code), the ionospheric electric potential (GEMSIS-POT) model, and SuperDARN electric field models with data assimilation. ERG (Arase) science center tools to support integrated studies with various kinds of data are also briefly introduced.[Figure not available: see fulltext.

  18. MITI project on advanced man-machine system for nuclear power plants

    International Nuclear Information System (INIS)

    Kato, Kanji; Watanabe, Takao; Hayakawa, Hiroyasu; Naito, Norio; Masui, Takao; Ogino, Takamichi.

    1988-01-01

    A computerized operator support system (COSS) against abnormal plant conditions was developed as a five-year project from 1980 to 1984, under the sponsorship of the Ministry of International Trade and Industry. The main purpose of the COSS development was to implement the lessons learned from the Three Mile Island accident. The main nuclear industries in Japan participated in the project. The design concept of the operator support functions and the method to implement it were established, and the prototype systems of the COSS for BWR and PWR plants were developed. After the completion of the COSS development, the above participant group once again joined for the work on an advanced man-machine system for nuclear power plants (MMS-NPP). This eight-year project aims at realizing an advanced operator support system by applying artificial intelligence, especially knowledge engineering, and sophisticated man-machine interface devices. Its main objectives are shown. This system configuration, operating method decision system, man-machine communication system, operation and maintenance support functions and so on are described. (Kako, I.)

  19. Technical Feasibility Study of Thermal Energy Storage Integration into the Conventional Power Plant Cycle

    Directory of Open Access Journals (Sweden)

    Jacek D. Wojcik

    2017-02-01

    Full Text Available The current load balance in the grid is managed mainly through peaking fossil-fuelled power plants that respond passively to the load changes. Intermittency, which comes from renewable energy sources, imposes additional requirements for even more flexible and faster responses from conventional power plants. A major challenge is to keep conventional generation running closest to the design condition with higher load factors and to avoid switching off periods if possible. Thermal energy storage (TES integration into the power plant process cycle is considered as a possible solution for this issue. In this article, a technical feasibility study of TES integration into a 375-MW subcritical oil-fired conventional power plant is presented. Retrofitting is considered in order to avoid major changes in the power plant process cycle. The concept is tested based on the complete power plant model implemented in the ProTRAX software environment. Steam and water parameters are assessed for different TES integration scenarios as a function of the plant load level. The best candidate points for heat extraction in the TES charging and discharging processes are evaluated. The results demonstrate that the integration of TES with power plant cycle is feasible and provide a provisional guidance for the design of the TES system that will result in the minimal influence on the power plant cycle.

  20. Efficient genome-wide genotyping strategies and data integration in crop plants.

    Science.gov (United States)

    Torkamaneh, Davoud; Boyle, Brian; Belzile, François

    2018-03-01

    Next-generation sequencing (NGS) has revolutionized plant and animal research by providing powerful genotyping methods. This review describes and discusses the advantages, challenges and, most importantly, solutions to facilitate data processing, the handling of missing data, and cross-platform data integration. Next-generation sequencing technologies provide powerful and flexible genotyping methods to plant breeders and researchers. These methods offer a wide range of applications from genome-wide analysis to routine screening with a high level of accuracy and reproducibility. Furthermore, they provide a straightforward workflow to identify, validate, and screen genetic variants in a short time with a low cost. NGS-based genotyping methods include whole-genome re-sequencing, SNP arrays, and reduced representation sequencing, which are widely applied in crops. The main challenges facing breeders and geneticists today is how to choose an appropriate genotyping method and how to integrate genotyping data sets obtained from various sources. Here, we review and discuss the advantages and challenges of several NGS methods for genome-wide genetic marker development and genotyping in crop plants. We also discuss how imputation methods can be used to both fill in missing data in genotypic data sets and to integrate data sets obtained using different genotyping tools. It is our hope that this synthetic view of genotyping methods will help geneticists and breeders to integrate these NGS-based methods in crop plant breeding and research.

  1. Integrated Environmental Assessment Modelling. Estimates of Emission and Measurement of Impacts. Final Report of the Spanish Subproject EU/Life Project

    International Nuclear Information System (INIS)

    Guardans, R.; Gimeno, B.S.; Bermejo, V.; Elvira, S.; Martin, F.; Palacios, M.; Rodriguez, E.; Donaire, I.

    2000-01-01

    This report describes the results of the Spanish participation in the project Coupling CORINAIR data to cost-effective emission reduction strategies based on critical thresholds. (EU/LIFE97/ENV/ FIN/336). The sub project has focused on three tasks: Develop tools to improve knowledge on the spatial and temporal details of emissions of air pollutants in Spain, Exploit existing experimental information on plant response to air pollutants in temperate ecosystems and Integrate these findings in a modelling framework that can asses with more accuracy the impact of air pollutants to temperate ecosystems. The results obtained during the execution of this project have significantly improved the models of the impact of alterative emission control strategies on ecosystems and crops in the Iberian Peninsula. (Author) 375 refs

  2. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  3. Inquiry Based Projects Using Student Ozone Measurements and the Status of Using Plants as Bio-Indicators

    Science.gov (United States)

    Ladd, I. H.; Fishman, J.; Pippin, M.; Sachs, S.; Skelly, J.; Chappelka, A.; Neufeld, H.; Burkey, K.

    2006-05-01

    Students around the world work cooperatively with their teachers and the scientific research community measuring local surface ozone levels using a hand-held optical scanner and ozone sensitive chemical strips. Through the GLOBE (Global Learning and Observations to Benefit the Environment) Program, students measuring local ozone levels are connected with the chemistry of the air they breathe and how human activity impacts air quality. Educational tools have been developed and correlated with the National Science and Mathematics Standards to facilitate integrating the study of surface ozone with core curriculum. Ozone air pollution has been identified as the major pollutant causing foliar injury to plants when they are exposed to concentrations of surface ozone. The inclusion of native and agricultural plants with measuring surface ozone provides an Earth system approach to understanding surface ozone. An implementation guide for investigating ozone induced foliar injury has been developed and field tested. The guide, Using Sensitive Plants as Bio-Indicators of Ozone Pollution, provides: the background information and protocol for implementing an "Ozone Garden" with native and agricultural plants; and, a unique opportunity to involve students in a project that will develop and increase their awareness of surface ozone air pollution and its impact on plants.

  4. Plant life management. Progress for structural integrity

    International Nuclear Information System (INIS)

    Solin, J.

    2003-03-01

    A joint project cluster of industry, VTT and other R and D suppliers is dealing with managing of lifetime of critical structures and components in energy and process industry. The research topics include systematic component lifetime management, data management, integrity and lifetime of pressure bearing components, non-destructive inspection, interactions of coolant and materials, environmentally assisted cracking and ageing of reactor internals. This Symposium is a compilation of selected papers describing an intermediate status of the projects after three years of research and development. (orig.)

  5. Integrated Plant Safety Assessment, Systematic Evaluation Program, Palisades Plant (Docket No. 50-255)

    International Nuclear Information System (INIS)

    1983-11-01

    This report documents the review completed under the SEP for those issues that required refined engineering evaluations or the continuation of ongoing evaluations after the Final IPSAR for the Palisades Plant was issued. The review has provided for (1) an assessment of the significance of differences between current technical positions on selected safety issues and those that existed when the Palisades Plant was licensed, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety when the supplement to the Final IPSAR and the Safety Evaluation Report for converting the license from a provisional to a full-term license have been issued. The Final IPSAR and its supplement will form part of the bases for considering the conversion of the provisional operating license to a full-term operating license

  6. Hanford Waste Vitrification Plant - the project and process systems

    International Nuclear Information System (INIS)

    Swenson, L.D.; Miller, W.C.; Smith, R.A.

    1990-01-01

    The Hanford Waste Vitrification Plant (HWVP) project is scheduled to start construction on the Hanford reservation in southeastern Washington State in 1991. The project will immobilize the liquid high-level defense waste stored there. The HWVP represents the third phase of the U.S. Department of Energy (DOE) activities that are focused on the permanent disposal of high-level radioactive waste, building on the experience of Defense Waste Processing Facility (DWPF) at the Savannah River site, South Carolina, and of the West Valley Demonstration Plant (WVDP), New York. This sequential approach to disposal of the country's commercial and defense high-level radioactive waste allows HWVP to make extensive use of lessons learned from the experience of its predecessors, using mature designs from the earlier facilities to achieve economies in design and construction costs while enhancing operational effectiveness

  7. Inter-organizational collaboration projects in the public sector: a balance between integration and demarcation.

    Science.gov (United States)

    Löfström, Mikael

    2010-01-01

    For several years, the development of the Swedish public sector has been accompanied by a discussion about inter-organizational collaboration, which has been examined in several national experiments. The experience, however, indicates significant difficulties in implementing collaboration in local authorities' regular activities. This article argues that organizing inter-organizational collaboration in projects tends to be counterproductive, since the purpose of this collaboration is to increase the integration of local authorities. This article is based on case studies of three different collaboration projects. Each project is analyzed in relation to the way collaboration is organized within the project and how the relationship to the local authorities' activities is designed. The outcome of these studies shows that while collaboration projects increase integration between the responsible authorities, the integration stays within the projects. This is due to the fact that the projects were designed as units separate from the responsible authorities. As a result, the collaboration that occurs in the projects is not implemented in the local authorities' activities, and the viability of the increased integration of different responsible authorities does not extend beyond the projects. Copyright (c) 2009 John Wiley & Sons, Ltd.

  8. Integration of hydrothermal carbonization and a CHP plant: Part 2 –operational and economic analysis

    International Nuclear Information System (INIS)

    Saari, Jussi; Sermyagina, Ekaterina; Kaikko, Juha; Vakkilainen, Esa; Sergeev, Vitaly

    2016-01-01

    Wood-fired combined heat and power (CHP) plants are a proven technology for producing domestic, carbon-neutral heat and power in Nordic countries. One drawback of CHP plants is the low capacity factors due to varying heat loads. In the current economic environment, uncertainty over energy prices creates also uncertainty over investment profitability. Hydrothermal carbonization (HTC) is a promising thermochemical conversion technology for producing an improved, more versatile wood-based fuel. Integrating HTC with a CHP plant allows simplifying the HTC process and extending the CHP plant operating time. An integrated polygeneration plant producing three energy products is also less sensitive to price changes in any one product. This study compares three integration cases chosen from the previous paper, and the case of separate stand-alone plants. The best economic performance is obtained using pressurized hot water from the CHP plant boiler drum as HTC process water. This has the poorest efficiency, but allows the greatest cost reduction in the HTC process and longest CHP plant operating time. The result demonstrates the suitability of CHP plants for integration with a HTC process, and the importance of economic and operational analysis considering annual load variations in sufficient detail. - Highlights: • Integration of wood hydrothermal carbonization with a small CHP plant studied. • Operation and economics of three concepts and stand-alone plants are compared. • Sensitivity analysis is performed. • Results show technical and thermodynamic analysis inadequate and misleading alone. • Minimizing HTC investment, extending CHP operating time important for profitability.

  9. Pathways to Energy from Inertial Fusion. An Integrated Approach. Report of a Coordinated Research Project 2006-2010

    International Nuclear Information System (INIS)

    2013-04-01

    The IAEA has continuously demonstrated its commitment to supporting the development of safe and environmentally clean nuclear fusion energy. Statistics show that at the current rate of energy consumption, fusion energy would remain an inexhaustible energy source for humankind for millions of years. Furthermore, some of the existing and foreseen risks - such as nuclear waste disposal and rising greenhouse gas emissions from the use of fossil fuels - can also be reduced. In the quest for fusion energy, two main lines of research and development are currently being pursued worldwide, namely the inertial and the magnetic confinement fusion concepts. For both approaches, the IAEA has conducted coordinated research activities focusing on specific physics and technological issues relevant the establishment of the knowledge base and foundation for the design and construction of fusion power plants. This report describes the recent research and technological developments and challenges in inertial fusion energy within the framework of such a coordinated research effort. The coordinated research project on Pathways to Energy from Inertial Fusion: An Integrated Approach was initiated in 2006 and concluded in 2010. The project involved experts and institutions from 16 Member States, addressing issues relevant to advancing inertial fusion energy research and development in its practical applications. The key topics addressed include: (i) high repetition rate, low cost, high efficiency ignition drivers; (ii) beam-matter/beam-plasma interaction related to inertial fusion target physics; (iii) target fusion chamber coupling and interface; and (iv) integrated inertial fusion power plant design. Participants in this coordinated research project have contributed 17 detailed research and technology progress reports of work performed at national and international levels. This report compiles all these reports while highlighting the various achievements.

  10. Feasibility studies to improve plant availability and reduce total installed cost in IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Kevin [General Electric Company, Houston, TX (United States); Anasti, William [General Electric Company, Houston, TX (United States); Fang, Yichuan [General Electric Company, Houston, TX (United States); Subramanyan, Karthik [General Electric Company, Houston, TX (United States); Leininger, Tom [General Electric Company, Houston, TX (United States); Zemsky, Christine [General Electric Company, Houston, TX (United States)

    2015-03-30

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6 – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.

  11. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  12. Engineering and training simulators: A combined approach for nuclear plant construction projects

    International Nuclear Information System (INIS)

    Harnois, Olivier; Gain, Pascal; Bartak, Jan; Gathmann, Ralf

    2007-01-01

    Full text: Simulation technologies have always been widely used on nuclear applications, but with a clear division between engineering application, using highly validated code run in batch mode, and training purpose where real time computation is a mandatory requirement. Thanks to the flexibility of modern simulation technology and the increased performance of computers, it becomes now possible to develop Nuclear Power plant simulators that can be used both for engineering and training purposes. In the last years, the revival of nuclear industry raised a number of new construction or plant finishing projects in which the application of this combined approach would result in decisive improvement on plant construction lead times, better project control and cost optimizations. The simulator development is to be executed in a step-wise approach, scheduled in parallel with the plant design and construction phases. During a first step, the simulator will model the plant nuclear island systems plus the corresponding instrumentation and control, specific malfunctions and local commands. It can then be used for engineering activities defining and validating the plant operating strategies in case of incidents or accidents. The Simulator executive Station and Operator Station will be in prototype version with an interface imagery enabling monitoring and control of the simulator. Availability of such simulation platform leads to a significant increase in efficiency of the engineering works, the possibility to validate basic design hypotheses and detect defects and conflicts early. The second phase will consist in the fully detailed simulation of Main Control Room plant supervision and control MMI, taking into account I and C control loops detailed design improvement, while having sufficient fidelity in order to be suitable for the future operator training. Its use will enable the engineering units not only to specify and validate normal, incident and accident detailed plant

  13. Operational experience with the Sizewell B integrated plant computer system

    International Nuclear Information System (INIS)

    Ladner, J.E.J.; Alexander, N.C.; Fitzpatrick, J.A.

    1997-01-01

    The Westinghouse Integrated System for Centralised Operation (WISCO) is the primary plant control system at the Sizewell B Power Station. It comprises three subsystems; the High Integrity Control System (HICS), the Process Control System (PCS) and the Distributed Computer system (DCS). The HICS performs the control and data acquisition of nuclear safety significant plant systems. The PCS uses redundant data processing unit pairs. The workstations and servers of the DCS communicate with each other over a standard ethernet. The maintenance requirements for every plant system are covered by a Maintenance Strategy Report. The breakdown of these reports is listed. The WISCO system has performed exceptionally well. Due to the diagnostic information presented by the HICS, problems could normally be resolved within 24 hours. There have been some 200 outstanding modifications to the system. The procedure of modification is briefly described. (A.K.)

  14. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  15. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  16. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  17. MODEL OF INTEGRATED VALUE OF PROJECTS IN THE FIELD OF ALTERNATIVE ENERGY

    Directory of Open Access Journals (Sweden)

    Наталія Ігорівна БОРИСОВА

    2015-05-01

    Full Text Available Development of alternative energy sources requires the implementation of complex problems, the solution of which is necessary to apply the project approach. The uniqueness of alternative energy projects (AEP necessitates individual approach to evaluating the effectiveness of each. The paper contains the results of the project management features's analysis in the field of alternative energy, determining the values and developing of the value management integrated conceptual model of AEP. In assessing the effectiveness of AEP considered the socio-economic and commercial aspects. Value management integrated conceptual model of AEP was obtained by combining the classical model of the project management goals with the project values model "Five "E" and two "A". The classical model of the project management goals have been complemented with risk parameters.

  18. Integrated gasification gas combined cycle plant with membrane reactors: Technological and economical analysis

    International Nuclear Information System (INIS)

    Amelio, Mario; Morrone, Pietropaolo; Gallucci, Fausto; Basile, Angelo

    2007-01-01

    In the present work, the capture and storage of carbon dioxide from the fossil fuel power plant have been considered. The main objective was to analyze the thermodynamic performances and the technological aspects of two integrated gasification gas combined cycle plants (IGCC), as well as to give a forecast of the investment costs for the plants and the resulting energy consumptions. The first plant considered is an IGCC* plant (integrated gasification gas combined cycle plant with traditional shift reactors) characterized by the traditional water gas shift reactors and a CO 2 physical adsorption system followed by the power section. The second one is an IGCC M plant (integrated gasification gas combined cycle plant with membrane reactor) where the coal thermal input is the same as the first one, but the traditional shift reactors and the physical adsorption unit are replaced by catalytic palladium membrane reactors (CMR). In the present work, a mono-dimensional computational model of the membrane reactor was proposed to simulate and evaluate the capability of the IGCC M plant to capture carbon dioxide. The energetic performances, efficiency and net power of the IGCC* and IGCC M plants were, thus, compared, assuming as standard a traditional IGCC plant without carbon dioxide capture. The economical aspects of the three plants were compared through an economical analysis. Since the IGCC* and IGCC M plants have additional costs related to the capture and disposal of the carbon dioxide, a Carbon Tax (adopted in some countries like Sweden) proportional to the number of kilograms of carbon dioxide released in the environment was assumed. According to the economical analysis, the IGCC M plant proved to be more convenient than the IGCC* one

  19. Summary of developments and future projects in nuclear power plant control and instrumentation in the Netherlands

    International Nuclear Information System (INIS)

    Plas, Y. van der

    1990-01-01

    A general view is given on the developments and trends due to instrumentation and control of the two nuclear power plants in the Netherlands around the year 1989. Several projects, under which for classification of systems and components and for emergency operating procedures, are executed in both plants. An OSART mission initiated a project to make possible the periodic test of safety commands during operation. An other large project concerned the replacement of the process presentation system in Nuclear Power Plant Borssele. In the article several other developments due to the application of I and C in existing plants are outlined generally. Since 1974, no new nuclear power plants have been constructed in the Netherlands. (author). 2 figs

  20. Heat integration in multipurpose batch plants using a robust scheduling framework

    CSIR Research Space (South Africa)

    Seid, ER

    2014-07-01

    Full Text Available This case study was taken from the petro- chemical plant by Kallrath [46] and used as a benchmark problem in the scheduling environment for multipurpose batch plants. We adapted this case study to incorporate energy integration. The recipe representa- tion...

  1. Quality assurance in technology development for The Clinch River Breeder Reactor Plant Project

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1980-01-01

    The Clinch River Breeder Reactor Plant Project is the nation's first large-scale demonstration of the Liquid Metal Fast Breeder Reactor (LMFBR) concept. The Project has established an overall program of plans and actions to assure that the plant will perform as required. The program has been established and is being implemented in accordance with Department of Energy Standard RDT F 2-2. It is being applied to all parts of the plant, including the development of technology supporting its design and licensing activity. A discussion of the program as it is applied to development is presented

  2. Fossil fuel savings, carbon emission reduction and economic attractiveness of medium-scale integrated biomass gasification combined cycle cogeneration plants

    Directory of Open Access Journals (Sweden)

    Kalina Jacek

    2012-01-01

    Full Text Available The paper theoretically investigates the system made up of fluidized bed gasifier, SGT-100 gas turbine and bottoming steam cycle. Different configurations of the combined cycle plant are examined. A comparison is made between systems with producer gas (PG and natural gas (NG fired turbine. Supplementary firing of the PG in a heat recovery steam generator is also taken into account. The performance of the gas turbine is investigated using in-house built Engineering Equation Solver model. Steam cycle is modeled using GateCycleTM simulation software. The results are compared in terms of electric energy generation efficiency, CO2 emission and fossil fuel energy savings. Finally there is performed an economic analysis of a sample project. The results show relatively good performance in the both alternative configurations at different rates of supplementary firing. Furthermore, positive values of economic indices were obtained. [Acknowledgements. This work was carried out within the frame of research project no. N N513 004036, titled: Analysis and optimization of distributed energy conversion plants integrated with gasification of biomass. The project is financed by the Polish Ministry of Science.

  3. UAS Integration in the NAS Project: Integrated Test and Evaluation (IT&E) Flight Test 3. Revision E

    Science.gov (United States)

    Marston, Michael

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  4. Thermal Integration of CO{sub 2} Compression Processes with Coal-Fired Power Plants Equipped with Carbon Capture

    Energy Technology Data Exchange (ETDEWEB)

    Edward Levy

    2012-06-29

    Coal-fired power plants, equipped either with oxycombustion or post-combustion CO{sub 2} capture, will require a CO{sub 2} compression system to increase the pressure of the CO{sub 2} to the level needed for sequestration. Most analyses show that CO{sub 2} compression will have a significant effect on parasitic load, will be a major capital cost, and will contribute significantly to reduced unit efficiency. This project used first principle engineering analyses and computer simulations to determine the effects of utilizing compressor waste heat to improve power plant efficiency and increase net power output of coal-fired power plants with carbon capture. This was done for units with post combustion solvent-based CO{sub 2} capture systems and for oxyfired power plants, firing bituminous, PRB and lignite coals. The thermal integration opportunities analyzed for oxycombustion capture are use of compressor waste heat to reheat recirculated flue gas, preheat boiler feedwater and predry high-moisture coals prior to pulverizing the coal. Among the thermal integration opportunities analyzed for post combustion capture systems are use of compressor waste heat and heat recovered from the stripper condenser to regenerate post-combustion CO{sub 2} capture solvent, preheat boiler feedwater and predry high-moisture coals. The overall conclusion from the oxyfuel simulations is that thermal integration of compressor heat has the potential to improve net unit heat rate by up to 8.4 percent, but the actual magnitude of the improvement will depend on the type of heat sink used and to a lesser extent, compressor design and coal rank. The simulations of a unit with a MEA post combustion capture system showed that thermal integration of either compressor heat or stripper condenser heat to preheat boiler feedwater would result in heat rate improvements from 1.20 percent to 4.19 percent. The MEA capture simulations further showed that partial drying of low rank coals, done in combination

  5. TOSHIBA CAE system for nuclear power plant

    International Nuclear Information System (INIS)

    Machiba, Hiroshi; Sasaki, Norio

    1990-01-01

    TOSHIBA aims to secure safety, increase reliability and improve efficiency through the engineering for nuclear power plant using Computer Aided Engineering (CAE). TOSHIBA CAE system for nuclear power plant consists of numbers of sub-systems which had been integrated centering around the Nuclear Power Plant Engineering Data Base (PDBMS) and covers all stage of engineering for nuclear power plant from project management, design, manufacturing, construction to operating plant service and preventive maintenance as it were 'Plant Life-Cycle CAE System'. In recent years, TOSHIBA has been devoting to extend the system for integrated intelligent CAE system with state-of-the-art computer technologies such as computer graphics and artificial intelligence. This paper shows the outline of CAE system for nuclear power plant in TOSHIBA. (author)

  6. Optimised heat recovery steam generators for integrated solar combined cycle plants

    Science.gov (United States)

    Peterseim, Jürgen H.; Huschka, Karsten

    2017-06-01

    The cost of concentrating solar power (CSP) plants is decreasing but, due to the cost differences and the currently limited value of energy storage, implementation of new facilities is still slow compared to photovoltaic systems. One recognized option to lower cost instantly is the hybridization of CSP with other energy sources, such as natural gas or biomass. Various references exist for the combination of CSP with natural gas in combined cycle plants, also known as Integrated Solar Combined Cycle (ISCC) plants. One problem with current ISCC concepts is the so called ISCC crisis, which occurs when CSP is not contributing and cycle efficiency falls below efficiency levels of solely natural gas only fired combined cycle plants. This paper analyses current ISCC concepts and compares them with two optimised designs. The comparison is based on a Kuraymat type ISCC plant and shows that cycle optimization enables a net capacity increase of 1.4% and additional daily generation of up to 7.9%. The specific investment of the optimised Integrated Solar Combined Cycle plant results in a 0.4% cost increase, which is below the additional net capacity and daily generation increase.

  7. The integrated project SOFC600 development of low-temperature SOFC

    DEFF Research Database (Denmark)

    Rietveld, B.; Van Berkel, F.; Zhang-Steenwinkel, Y.

    2009-01-01

    The Integrated Project SOFC600 unites 21 partners jointly working on the research and development of SOFC stack components for operation at 600oC. The project is funded by the European Commission within the 6th Framework Programme. Low-temperature operation is considered essential for achieving c...

  8. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS. ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    International Nuclear Information System (INIS)

    Rutherford, W.W.; Geuther, W.J.; Strankman, M.R.; Conrad, E.A.; Rhoadarmer, D.D.; Black, D.M.; Pottmeyer, J.A.

    2009-01-01

    dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk

  9. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR; CONRAD EA; RHOADARMER DD; BLACK DM; POTTMEYER JA

    2009-04-29

    dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.

  10. European integration in crisis? Of supranational integration, hegemonic projects and domestic politics

    Science.gov (United States)

    Bulmer, Simon; Joseph, Jonathan

    2015-01-01

    The European Union is facing multiple challenges. Departing from mainstream theory, this article adopts a fresh approach to understanding integration. It does so by taking two theoretical steps. The first introduces the structure–agency debate in order to make explicit the relationship between macro-structures, the institutional arrangements at European Union level and agency. The second proposes that the state of integration should be understood as the outcome of contestation between competing hegemonic projects that derive from underlying social processes and that find their primary expression in domestic politics. These two steps facilitate an analysis of the key areas of contestation in the contemporary European Union, illustrated by an exploration of the current crisis in the European Union, and open up the development of an alternative, critical, theory of integration. PMID:29708125

  11. Energetic and environmental performance of three biomass upgrading processes integrated with a CHP plant

    International Nuclear Information System (INIS)

    Kohl, Thomas; Laukkanen, Timo; Järvinen, Mika; Fogelholm, Carl-Johan

    2013-01-01

    Highlights: ► We simulate CHP-integrated production of wood pellets, torrefied wood pellets and pyrolysis slurry. ► Integration increases operation hours and district heat output by up to 38% and 22%. ► Additionally installed equipment reduces yearly power generation by up to 7%. ► Wood pellet production performs best energetically and environmentally. ► Integrated concepts substantially reduce fuel consumption and CO 2 emissions. - Abstract: In order to react on future expected increased competition on restricted biomass resources, communal combined heat and power (CHP) plants can be integrated with biomass upgrading processes that add valuable products to the portfolio. In this paper, outgoing from a base case, the retrofit integration of production of wood pellets (WPs), torrefied wood pellets (TWPs) and wood fast pyrolysis slurry (PS) with an existing wood-fired CHP plant was simulated. Within the integration concept, free boiler capacity during times of low district heat demands is used to provide energy for the upgrading processes. By detailed part-load modelling, critical process parameters are discussed. With help of a multiperiod model of the heat duration curve, the work further shows the influence of the integration on plant operating hours, electricity production and biomass throughput. Environmental and energetic performance is assessed according to European standard EN 15603 and compared to the base case as well as to stand-alone production in two separate units. The work shows that all three integration options are well possible within the operational limits of the CHP plant. Summarising, this work shows that integration of WP, TWP and PS production from biomass with a CHP plant by increasing the yearly boiler workload leads to improved primary energy efficiency, reduced CO 2 emissions, and, when compared to stand-alone production, also to substantial fuel savings

  12. On the Sense of Ownership of a Community Integration Project ...

    African Journals Online (AJOL)

    On the Sense of Ownership of a Community Integration Project: Phenomenology as Praxis in the Transfer of Project Ownership from Third-Party Facilitators to a Community after Conflict Resolution. ... Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader.

  13. Integrated monitoring of wind plant systems

    Science.gov (United States)

    Whelan, Matthew J.; Janoyan, Kerop D.; Qiu, Tong

    2008-03-01

    Wind power is a renewable source of energy that is quickly gaining acceptance by many. Advanced sensor technologies have currently focused solely on improving wind turbine rotor aerodynamics and increasing of the efficiency of the blade design and concentration. Alternatively, potential improvements in wind plant efficiency may be realized through reduction of reactionary losses of kinetic energy to the structural and substructural systems supporting the turbine mechanics. Investigation of the complete dynamic structural response of the wind plant is proposed using a large-scale, high-rate wireless sensor network. The wireless network enables sensors to be placed across the sizable structure, including the rotating blades, without consideration of cabling issues and the economic burden associated with large spools of measurement cables. A large array of multi-axis accelerometers is utilized to evaluate the modal properties of the system as well as individual members and would enable long-term structural condition monitoring of the wind turbine as well. Additionally, environmental parameters, including wind speed, temperature, and humidity, are wirelessly collected for correlation. Such a wireless system could be integrated with electrical monitoring sensors and actuators and incorporated into a remote multi-turbine centralized plant monitoring and control system.

  14. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  15. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  16. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  17. Localizing genes using linkage disequilibrium in plants: integrating ...

    African Journals Online (AJOL)

    GREGO

    2007-03-19

    Mar 19, 2007 ... Localizing genes using linkage disequilibrium in plants: integrating lessons ... reduce that association as a function of the marker distance from the QTL. ..... the gene locus enhanced the resolution power of asso- ciation tests .... agents, such as insects, birds, water and wind, so mating is determined by a ...

  18. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  19. CAREM Project

    International Nuclear Information System (INIS)

    Ishida, Viviana; Gomez, Silvia

    2001-01-01

    CAREM project consists on the development and design of an advanced nuclear power plant. CAREM is a very low power innovative reactor conceived with new generation design solutions. Based on an indirect cycle integrated light water reactor using enriched uranium, CAREM has some distinctive features that greatly simplify the reactor and also contribute to a high level of safety: integrated primary system, primary system cooling by natural convection, self pressurization, and passive safety systems. In order to verify its innovative features the construction of a prototype is planned. (author)

  20. Development of web-based integrity evaluation system for primary components in a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.M.; Kim, J.C.; Choi, J.B.; Kim, Y.J. [SAFE Research Center, Sungkyunkwan Univ., Suwon (Korea); Choi, S.N.; Jang, K.S.; Hong, S.Y. [Korea Electronic Power Research Inst., Daejeon (Korea)

    2004-07-01

    A nuclear power plant is composed of a number of primary components. Maintaining the integrity of these components is one of the most critical issues in nuclear industry. In order to maintain the integrity of these primary components, a complicated procedure is required including periodical in-service inspection, failure assessment, fracture mechanics analysis, etc. Also, experts in different fields have to co-operate to resolve the integrity issues on the basis of inspection results. This integrity evaluation process usually takes long, and thus, is detrimental for the plant productivity. Therefore, an effective safety evaluation system is essential to manage integrity issues on a nuclear power plant. In this paper, a web-based integrity evaluation system for primary components in a nuclear power plant is proposed. The proposed system, which is named as WEBIES (web-based integrity evaluation system), has been developed in the form of 3-tier system architecture. The system consists of three servers; application program server, user interface program server and data warehouse server. The application program server includes the defect acceptance analysis module and the fracture mechanics analysis module which are programmed on the basis of ASME sec. XI, appendix A. The data warehouse server provides data for the integrity evaluation including material properties, geometry information, inspection data and stress data. The user interface program server provides information to all co- workers in the field of integrity evaluation. The developed system provides engineering knowledge-based information and concurrent and collaborative working environment through internet, and thus, is expected to raise the efficiency of integrity evaluation procedures on primary components of a nuclear power plant. (orig.)

  1. Development of web-based integrity evaluation system for primary components in a nuclear power plant

    International Nuclear Information System (INIS)

    Lee, S.M.; Kim, J.C.; Choi, J.B.; Kim, Y.J.; Choi, S.N.; Jang, K.S.; Hong, S.Y.

    2004-01-01

    A nuclear power plant is composed of a number of primary components. Maintaining the integrity of these components is one of the most critical issues in nuclear industry. In order to maintain the integrity of these primary components, a complicated procedure is required including periodical in-service inspection, failure assessment, fracture mechanics analysis, etc. Also, experts in different fields have to co-operate to resolve the integrity issues on the basis of inspection results. This integrity evaluation process usually takes long, and thus, is detrimental for the plant productivity. Therefore, an effective safety evaluation system is essential to manage integrity issues on a nuclear power plant. In this paper, a web-based integrity evaluation system for primary components in a nuclear power plant is proposed. The proposed system, which is named as WEBIES (web-based integrity evaluation system), has been developed in the form of 3-tier system architecture. The system consists of three servers; application program server, user interface program server and data warehouse server. The application program server includes the defect acceptance analysis module and the fracture mechanics analysis module which are programmed on the basis of ASME sec. XI, appendix A. The data warehouse server provides data for the integrity evaluation including material properties, geometry information, inspection data and stress data. The user interface program server provides information to all co- workers in the field of integrity evaluation. The developed system provides engineering knowledge-based information and concurrent and collaborative working environment through internet, and thus, is expected to raise the efficiency of integrity evaluation procedures on primary components of a nuclear power plant. (orig.)

  2. The impact of solarisation integrated with plant bio-fermentation on root knot nematodes

    International Nuclear Information System (INIS)

    Ibrahim, S. K.; Traboulsi, A. F.

    2009-01-01

    The impact of different freshly/dried chopped medicinal or aromatic plant materials as an organic amendment in pot cultures, as well as integrated with solarisation under greenhouse conditions on the root knot nematodes population was evaluated. Results indicated that application of solarisation alone gave good control (72%) but when integrated with different plant materials, the control level increased to 95% with Allium sativum and 90% with Mentha microphylla and slightly less with other plant materials which ranged from75 to 80%. The results of pot experiments revealed that the most significant effect on the number of nematodes was achieved with Tagetes patula followed by Pimpinella anisum, Melia azadirach and Origanium syriacum reaching 0.0, 1.2, 1.2 and 2.5/g of roots, respectively. Total control was obtained with Allium sativum. Origanium syriacum contained the highest amount of essential oil (6%). Results obtained indicated that integrated approach using solarisation combined with plant materials could be the best alternative control for the root-knot nematodes. (author)

  3. 3D digital dynamic management of maintenance projects for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Baizhong; Luo Yalin; Fang Hao; Ma Li; Zhang Jie; Wang Ruobing; Xie Min

    2005-01-01

    The whole process for the application of digital plant technique in the equipment transport in reactor building and the dynamic management of the spatial arrangement in Daya Bay Nuclear Power Station was introduced in the paper. The establishment of 3D digital Daya Bay plant, and the method and procedure to apply it in the nuclear power plant maintenance project have been discussed. This project utilizes the outer database to preserve the maintenance status of equipments, and avoids the damage or changing of the original 3D final model. Based on the maintenance procedure, the spatial arrangement and schedule for the maintenance of nuclear power station have been simulated and optimized for the whole process. This technique can simulate and optimize the arrangement and spatial arrangement for maintenance in limited space. It has been applied successfully in the reactor vessel head replacement for Unit 2 of Daya Bay NPP to shorten the time for key routes and the total time of this project by 16 hours and 92.5 hours, respectively. (author)

  4. Application of an integrated model for evaluation and optimization of business projects portfolios

    Directory of Open Access Journals (Sweden)

    Camila Costa Dutra

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio.

  5. APPLICATION OF AN INTEGRATED MODEL FOR EVALUATION AND OPTIMIZATION OF BUSINESS PROJECTS PORTFOLIOS

    Directory of Open Access Journals (Sweden)

    Maria Auxiliadora Cannarozzo Tinoco

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio

  6. An integrated translation of design data of a nuclear power plant from a specification-driven plant design system to neutral model data

    International Nuclear Information System (INIS)

    Mun, Duhwan; Yang, Jeongsam

    2010-01-01

    How to efficiently integrate and manage lifecycle data of a nuclear power plant has gradually become an important object of study. Because plants usually have a very long period of operation and maintenance, the plant design data need to be presented in a computer-interpretable form and to be independent of any commercial systems. The conversion of plant design data from various design systems into neutral model data is therefore an important technology for the effective operation and maintenance of plants. In this study, a neutral model for the efficient integration of plant design data is chosen from among the currently available options and extended in order to cover the information model requirements of nuclear power plants in Korea. After the mapping of the neutral model and the data model of a specification-driven plant design system, a plant data translator is also implemented in accordance with the schema mapping results.

  7. An integrated translation of design data of a nuclear power plant from a specification-driven plant design system to neutral model data

    Energy Technology Data Exchange (ETDEWEB)

    Mun, Duhwan, E-mail: dhmun@moeri.re.k [Marine Safety and Pollution Response Research Department, Maritime and Ocean Engineering Research Institute, KORDI, 171 Jang-dong, Yuseong-gu, Daejeon 305-343 (Korea, Republic of); Yang, Jeongsam, E-mail: jyang@ajou.ac.k [Division of Industrial and Information Systems Engineering, Ajou University, San 5, Wonchun-dong, Yeongtong-gu, Suwon 443-749 (Korea, Republic of)

    2010-03-15

    How to efficiently integrate and manage lifecycle data of a nuclear power plant has gradually become an important object of study. Because plants usually have a very long period of operation and maintenance, the plant design data need to be presented in a computer-interpretable form and to be independent of any commercial systems. The conversion of plant design data from various design systems into neutral model data is therefore an important technology for the effective operation and maintenance of plants. In this study, a neutral model for the efficient integration of plant design data is chosen from among the currently available options and extended in order to cover the information model requirements of nuclear power plants in Korea. After the mapping of the neutral model and the data model of a specification-driven plant design system, a plant data translator is also implemented in accordance with the schema mapping results.

  8. The interplay between formal and informal contracting in integrated project delivery

    NARCIS (Netherlands)

    Bygballe, L.E.; Dewulf, Geert P.M.R.; Levitt, R.

    2015-01-01

    This research examines the interplay between formal and informal contracting in integrated project delivery (IPD). It investigates how the interplay enables parties in health-care construction projects to cope with uncertainty and complexities, due to, among others, changing demands. New delivery

  9. Architectures of adaptive integration in large collaborative projects

    Directory of Open Access Journals (Sweden)

    Lois Wright Morton

    2015-12-01

    Full Text Available Collaborations to address complex societal problems associated with managing human-natural systems often require large teams comprised of scientists from multiple disciplines. For many such problems, large-scale, transdisciplinary projects whose members include scientists, stakeholders, and other professionals are necessary. The success of very large, transdisciplinary projects can be facilitated by attending to the diversity of types of collaboration that inevitably occur within them. As projects progress and evolve, the resulting dynamic collaborative heterogeneity within them constitutes architectures of adaptive integration (AAI. Management that acknowledges this dynamic and fosters and promotes awareness of it within a project can better facilitate the creativity and innovation required to address problems from a systems perspective. In successful large projects, AAI (1 functionally meets objectives and goals, (2 uses disciplinary expertise and concurrently bridges many disciplines, (3 has mechanisms to enable connection, (4 delineates boundaries to keep focus but retain flexibility, (5 continuously monitors and adapts, and (6 encourages project-wide awareness. These principles are illustrated using as case studies three large climate change and agriculture projects funded by the U.S. Department of Agriculture-National Institute of Food and Agriculture.

  10. Integrated safety assessment report, Haddam Neck Plant (Docket No. 50-213): Integrated Safety Assessment Program: Draft report

    International Nuclear Information System (INIS)

    1987-07-01

    The integrated assessment is conducted on a plant-specific basis to evaluate all licensing actions, licensee initiated plant improvements and selected unresolved generic/safety issues to establish implementation schedules for each item. Procedures allow for a periodic updating of the schedules to account for licensing issues that arise in the future. The Haddam Neck Plant is one of two plants being reviewed under the pilot program. This report indicates how 82 topics selected for review were addressed, and presents the staff's recommendations regarding the corrective actions to resolve the 82 topics and other actions to enhance plant safety. 135 refs., 4 figs., 5 tabs

  11. Large scale PV plants - also in Denmark. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Ahm, P [PA Energy, Malling (Denmark); Vedde, J [SiCon. Silicon and PV consulting, Birkeroed (Denmark)

    2011-04-15

    Large scale PV (LPV) plants, plants with a capacity of more than 200 kW, has since 2007 constituted an increasing share of the global PV installations. In 2009 large scale PV plants with cumulative power more that 1,3 GWp were connected to the grid. The necessary design data for LPV plants in Denmark are available or can be found, although irradiance data could be improved. There seems to be very few institutional barriers for LPV projects, but as so far no real LPV projects have been processed, these findings have to be regarded as preliminary. The fast growing number of very large scale solar thermal plants for district heating applications supports these findings. It has further been investigated, how to optimize the lay-out of LPV plants. Under the Danish irradiance conditions with several winter months with very low solar height PV installations on flat surfaces will have to balance the requirements of physical space - and cost, and the loss of electricity production due to shadowing effects. The potential for LPV plants in Denmark are found in three main categories: PV installations on flat roof of large commercial buildings, PV installations on other large scale infrastructure such as noise barriers and ground mounted PV installations. The technical potential for all three categories is found to be significant and in the range of 50 - 250 km2. In terms of energy harvest PV plants will under Danish conditions exhibit an overall efficiency of about 10 % in conversion of the energy content of the light compared to about 0,3 % for biomass. The theoretical ground area needed to produce the present annual electricity consumption of Denmark at 33-35 TWh is about 300 km2 The Danish grid codes and the electricity safety regulations mention very little about PV and nothing about LPV plants. It is expected that LPV plants will be treated similarly to big wind turbines. A number of LPV plant scenarios have been investigated in detail based on real commercial offers and

  12. Strategically oriented project management of the decommissioning of nuclear power plants; Strategieorientiertes Projektmanagement der Stilllegung von Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Kemmeter, Sascha [Conscore GmbH, Duesseldorf (Germany); Woempener, Andreas [Duisburg-Essen Univ., Duisburg (Germany). Lehrstuhl fuer ABWL und Controlling

    2013-12-15

    Due to the politically induced change of the energy sector in Germany, the operators of nuclear power plants had to react and to deal with completely new conditions concerning the decommissioning of their plants on short notice. Therefore the operators have to devise new strategies for controlling their decommissioning and dismantling projects in a short amount of time and most often similarly for several plants. Two fundamental procedures are possible for the successful controlling of these dismantling projects: a centralized or a decentralized management organization. How these project control processes can be realized in an optimal way, is, next to other economic specifications of the dismantling of nuclear power plants, the topic of a new research project of the Chair of Management Accounting at the University Duisburg-Essen. In that process, results and experiences from other research and practical projects concerning general large-scale projects are being used. Selected findings have been compiled and are being discussed in this paper. (orig.)

  13. An integrated ball projection technology for the study of dynamic interceptive actions.

    Science.gov (United States)

    Stone, J A; Panchuk, D; Davids, K; North, J S; Fairweather, I; Maynard, I W

    2014-12-01

    Dynamic interceptive actions, such as catching or hitting a ball, are important task vehicles for investigating the complex relationship between cognition, perception, and action in performance environments. Representative experimental designs have become more important recently, highlighting the need for research methods to ensure that the coupling of information and movement is faithfully maintained. However, retaining representative design while ensuring systematic control of experimental variables is challenging, due to the traditional tendency to employ methods that typically involve use of reductionist motor responses such as buttonpressing or micromovements. Here, we outline the methodology behind a custom-built, integrated ball projection technology that allows images of advanced visual information to be synchronized with ball projection. This integrated technology supports the controlled presentation of visual information to participants while they perform dynamic interceptive actions. We discuss theoretical ideas behind the integration of hardware and software, along with practical issues resolved in technological design, and emphasize how the system can be integrated with emerging developments such as mixed reality environments. We conclude by considering future developments and applications of the integrated projection technology for research in human movement behaviors.

  14. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  15. Diablo Canyon plant information management system and integrated communication system

    International Nuclear Information System (INIS)

    Stanley, J.W.; Groff, C.

    1990-01-01

    The implementation of a comprehensive maintenance system called the plant information management system (PIMS) at the Diablo Canyon plant, together with its associated integrated communication system (ICS), is widely regarded as the most comprehensive undertaking of its kind in the nuclear industry. This paper provides an overview of the program at Diablo Canyon, an evaluation of system benefits, and highlights the future course of PIMS

  16. Diablo Canyon plant information management system and integrated communication system

    Energy Technology Data Exchange (ETDEWEB)

    Stanley, J.W.; Groff, C.

    1990-06-01

    The implementation of a comprehensive maintenance system called the plant information management system (PIMS) at the Diablo Canyon plant, together with its associated integrated communication system (ICS), is widely regarded as the most comprehensive undertaking of its kind in the nuclear industry. This paper provides an overview of the program at Diablo Canyon, an evaluation of system benefits, and highlights the future course of PIMS.

  17. Design and control of integrated styrene aniline production plant

    NARCIS (Netherlands)

    Partenie, O.; Van der Last, V.; Sorin Bildea, C.; Altimari, P.

    2009-01-01

    This paper illustrates the operational difficulties arising from simultaneously performing exothermic and endothermic reactions, and demonstrates that a plant can be built and safely operated by integrating the design and plantwide control issues. The behaviour of reactor – separation – recycle

  18. Transgenic plants as vital components of integrated pest management

    NARCIS (Netherlands)

    Kos, Martine; van Loon, J.J.A.; Dicke, M.; Vet, L.E.M.

    2009-01-01

    Although integrated pest management (IPM) strategies have been developed worldwide, further improvement of IPM effectiveness is required. The use of transgenic technology to create insect-resistant plants can offer a solution to the limited availability of highly insect-resistant cultivars.

  19. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  20. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  1. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  2. EVMS for nuclear power plant construction: status and implementation

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.; Park, S. Y.

    2012-01-01

    The Earned Value Management System (EVMS) method integrates three critical elements of project management scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows for casting of project cost and schedule at completion and highlights the possible need for corrective action. It is anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners. This paper is to review the status of EVMS and its effective implementation to nuclear power plant construction

  3. Energy saving and emission reduction: A project of coal-resource integration in Shanxi Province, China

    International Nuclear Information System (INIS)

    Zhang Jianjun; Fu Meichen; Geng Yuhuan; Tao Jin

    2011-01-01

    The small or middle coal mines with illegal operations in developing countries or regions can cause bad energy waste and environmental disruption. The project of coal-resource integration in Shanxi Province of China gives a new idea or an approach to energy saving and emission reduction. It is a social- and economic-ecological project. The paper shows the targets of energy saving and emission reduction in Shanxi Province, and analyses the aims, significance, design process and implementation of the integration project. Based on that, the paper discusses the challenges and opportunities the project brings. The analysis shows that the project of coal-resource integration in developing countries or regions can effectively improve mining technologies, collect capital and impel international cooperation and exchange. Finally, the paper analyses the concerns about the future, including the possible problems of implementation period, industrial updating, environmental impact and re-employment. However, the successful integration of coal resources can mitigate energy crisis and climate crisis and promote cleaner production effectively. - Highlights: → Coal-resource integration gives a new idea or an approach to energy saving and emission reduction. → Coal-resource integration mitigates climate crisis and promotes cleaner production. → Coal-resource integration brings challenges and opportunities to traditional mining industries.

  4. The reliability evaluation of reclaimed water reused in power plant project

    Science.gov (United States)

    Yang, Jie; Jia, Ru-sheng; Gao, Yu-lan; Wang, Wan-fen; Cao, Peng-qiang

    2017-12-01

    The reuse of reclaimed water has become one of the important measures to solve the shortage of water resources in many cities, But there is no unified way to evaluate the engineering. Concerning this issue, it took Wanneng power plant project in Huai city as a example, analyzed the reliability of wastewater reuse from the aspects of quality in reclaimed water, water quality of sewage plant, the present sewage quantity in the city and forecast of reclaimed water yield, in particular, it was necessary to make a correction to the actual operation flow rate of the sewage plant. the results showed that on the context of the fluctuation of inlet water quality, the outlet water quality of sewage treatment plants is basically stable, and it can meet the requirement of circulating cooling water, but suspended solids(SS) and total hardness in boiler water exceed the limit, and some advanced treatment should be carried out. In addition, the total sewage discharge will reach 13.91×104m3/d and 14.21×104m3/d respectively in the two planning level years of the project. They are greater than the normal collection capacity of the sewage system which is 12.0×104 m3/d, and the reclaimed water yield can reach 10.74×104m3/d, which is greater than the actual needed quantity 8.25×104m3/d of the power plant, so the wastewater reuse of this sewage plant are feasible and reliable to the power plant in view of engineering.

  5. Information integration in control rooms and technical offices in nuclear power plants. Report prepared within the framework of the International Working Group on Nuclear Power Plant Control and Instrumentation

    International Nuclear Information System (INIS)

    2001-11-01

    in Nuclear Power Plants (1998). This report is intended typically for plant managers, project managers, Instrumentation and Control system designers, system engineers, operations managers, operators, and other plant information users. This report is the result of a series of consultants meetings held in Vienna (April 1999, March 2000, October 2000). It was prepared with the participation and contributions of experts from the Czech Republic, Hungary, Norway, Sweden and the United States of America. In addition, a related Specialists Meeting on Integrated Information Presentation in Control Rooms and Technical Offices at Nuclear Power Plants was held in Stockholm, Sweden in May 2000. The experts, with the help of an expert from Germany, incorporated some of the lessons learned in the meeting papers into this report

  6. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  7. Great Lakes O shore Wind Project: Utility and Regional Integration Study

    Energy Technology Data Exchange (ETDEWEB)

    Sajadi, Amirhossein [Case Western Reserve Univ., Cleveland, OH (United States); Loparo, Kenneth A. [Case Western Reserve Univ., Cleveland, OH (United States); D' Aquila, Robert [General Electric (GE), Albany, NY (United States); Clark, Kara [National Renewable Energy Lab. (NREL), Golden, CO (United States); Waligorski, Joseph G. [FirstEnergy, Akron, OH (United States); Baker, Scott [PJM Interconnection, Audubon, PA (United States)

    2016-06-30

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

  8. Towards the automotive HMI of the future: Overview of the AIDE - Integrated project results

    NARCIS (Netherlands)

    Amditis, A.; Andreone, L.; Pagle, K.; Markkula, G.; Deregibus, E.; Romera Rue, M.; Bellotti, F.; Engelsberg, A.; Brouwer, R.; Peters, B.; Gloria, A. de

    2010-01-01

    The Adaptive Integrated Driver-vehicle interfacE (AIDE) is an integrated project funded by the European Commission in the Sixth Framework Programme. The project, which involves 31 partners from the European automotive industry and academia, deals with behavioral and technical issues related to

  9. Integration of new nuclear power plants into transmission grids part I: Transmission system issues

    International Nuclear Information System (INIS)

    Abi-Samra, N.

    2008-01-01

    Integration of new nuclear plants into a transmission system is a two sided problem. On one side, adding the nuclear plant into an existing grid will change the attributes of that grid: e.g., loading of certain transmission lines will increase; voltages will be affected, etc. On the other side, the grid itself will affect the plant, and the plant needs to be designed to accommodate the specifics of the grid. Based on that, this paper is divided into two parts. Part I addresses the grid issues with the integration of the new plant, with emphasis on the electrical aspects of these issues. Part II of this paper, concentrates on the vulnerability of the plant from grid disturbances. Part II reintroduces a relatively new concept by this author called the Zone of Vulnerability (ZoV) for the new nuclear plants. (authors)

  10. Case study: centralized wastewater treatment plant at Rawang Integrated Industrial Park

    International Nuclear Information System (INIS)

    Ting Teo Ming; Khomsaton Abu Bakar; Zulkafli Ghazali; Khairul Zaman Mohd Dahlan

    2006-01-01

    Survey has been conducted at Rawang Integrated Industrial Park (RIIP) to investigate the possibility of setting up centralized industrial wastewater treatment plant. Rawang integrated industrial park is selected based on suggestion from department of environment. RIIP consists of about 150 industries with various type of activities operated in the area. Only 9 out of estimated 150 industries have individual wastewater treatment plant. The business activities of the 9 industries include food processing, textile, welding rods manufacturing, steel galvanizing and battery manufacturing. Wastewater generated by the industries are characterized by high oil and grease, cod, bod, organic matter, metal hydroxide and acidic. Besides that most of industries do the monitoring only once a month. This paper will also discuss the advantages of setting up of centralized industrial wastewater treatment plant to the government authorities, industries, people and environment. (Author)

  11. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  12. Decommissioning project of commercial nuclear power plant

    International Nuclear Information System (INIS)

    Karigome, S.

    2008-01-01

    Decommissioning project of commercial nuclear power plant in Japan was outlined. It is expected that the land, after the decommissioning of commercial nuclear power plants, will serve as sites for new plants. Steps will be taken to reduce the amount of wastes generated and to recycle/reuse them. Wastes with a radioactivity concentration below the 'clearance level' need not be dealt with as radioactive material, and may be handled in the same way as conventional wastes. The Tokai-1 power station, a 166 MWe carbon dioxide cooled reactor which closed down in 1998, is being decommissioned and the first ten years as 'safe storage' to allow radioactivity to decay. Non-reactor grade components such as turbines were already removed, heat exchanger dismantling started and the reactor will be dismantled, the buildings demolished and the site left ready for reuse. All radioactive wastes will be classified as low-level wastes in three categories and will be buried under the ground. The total cost will be 88.5 billion yen -34.7 billion for dismantling and 53.8 billion for waste treatment including the graphite moderator. (T. Tanaka)

  13. Performance evaluation of high-sulphur coal-fired USC plant integrated with SNOX and CO2 capture sections

    International Nuclear Information System (INIS)

    Cau, Giorgio; Tola, Vittorio; Bassano, Claudia

    2015-01-01

    In recent years coal-fired power plants have increased their role in the global energy scenario thanks to reliability, security of fuel supply and lower cost of fuel and electricity. In this framework global warming issues require a sustainable use of coal and great efforts for greenhouse gases reduction, addressing research and development projects towards more efficient solutions in terms of efficiency and environmental impact. With this aim in this paper a performance assessment of an Ultra Super Critical (USC) steam plant integrated with a CO 2 removal section was carried out. The study is based on simulation models specifically developed through Aspen-Plus and Gate-Cycle software platforms. Performance was assessed referring to typical USC commercial size plants (400–600 MW), fuelled by a mix of a low-sulphur coal and a Sardinian (Sulcis) high-sulphur coal. The USC plant, based on a reheated and regenerative Rankine cycle, is integrated with an SNOX section, with integrated DeNO x and DeSO x processes, and a low temperature CO 2 capture section. The SNOX technology shows several advantages in comparison to conventional de-nitrification and de-sulphuration systems. In particular it is capable to remove both nitrogen and sulphur oxides, requiring less energy absorption compared to traditional FGD systems, allowing a further preheating of the combustion air and without producing process waste. Besides the SNOX releases a commercial product as the sulphuric acid (H 2 SO 4 ) and operational costs are reduced when sulphur content in the coal increases. The CO 2 capture system was based on a chemical absorption process. A conventional system based on an amine (monoethanolamine, MEA) aqueous solution was considered. In order to match high pressure and purity CO 2 transportation requirements, the CO 2 removal section is also integrated with a conditioning and compression section. A performance assessment of the USC plant was carried out varying the high-sulphur coal

  14. Introducing the term 'Biocontrol Plants' for integrated pest management

    Directory of Open Access Journals (Sweden)

    Pia Parolin

    2014-02-01

    Full Text Available Studies of interactions between crops, additional plants, pests and beneficial organisms already exist as well as studies of natural enemy preference, dispersal, and abundance. However, these studies focus on tri-trophic interactions from an "arthropod" point of view. We think that in order to optimize crop protection methods we need to understand the effects that plant structures have on the various arthropods and on subsequent tri-trophic interactions. Although studies and reviews describing the role of secondary plants in Integrated Pest Management (IPM exist, to date a general term which encompasses all plants added to a cropping system with the aim of enhancing IPM strategies has yet to be formulated. Therefore, we suggest a new term, "biocontrol plants", which we define as plants that are intentionally added to a crop system with the aim of enhancing crop productivity through pest attraction and/or pest regulation; a term that will promote the use of biocontrol services, and can ultimately lead to an increase in the sustainability of cropping systems.

  15. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  16. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Joo, Po Kook; Kim, Gye Ryung (and others)

    2003-06-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the subprojects from the various fields, It has been tried to make the subprojects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, TRM(Technology Road Map) is made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  17. Three integrated photovoltaic/sound barrier power plants. Construction and operational experience

    International Nuclear Information System (INIS)

    Nordmann, T.; Froelich, A.; Clavadetscher, L.

    2002-01-01

    After an international ideas competition by TNC Switzerland and Germany in 1996, six companies where given the opportunity to construct a prototype of their newly developed integrated PV-sound barrier concepts. The main goal was to develop highly integrated concepts, allowing the reduction of PV sound barrier systems costs, as well as the demonstration of specific concepts for different noise situations. This project is strongly correlated with a German project. Three of the concepts of the competition are demonstrated along a highway near Munich, constructed in 1997. The three Swiss installations had to be constructed at different locations, reflecting three typical situations for sound barriers. The first Swiss installation was the world first Bi-facial PV-sound barrier. It was built on a highway bridge at Wallisellen-Aubrugg in 1997. The operational experience of the installation is positive. But due to the different efficiencies of the two cell sides, its specific yield lies somewhat behind a conventional PV installation. The second Swiss plant was finished in autumn 1998. The 'zig-zag' construction is situated along the railway line at Wallisellen in a densely inhabited area with some local shadowing. Its performance and its specific yield is comparatively low due to a combination of several reasons (geometry of the concept, inverter, high module temperature, local shadows). The third installation was constructed along the motor way A1 at Bruettisellen in 1999. Its vertical panels are equipped with amorphous modules. The report show, that the performance of the system is reasonable, but the mechanical construction has to be improved. A small trial field with cells directly laminated onto the steel panel, also installed at Bruettisellen, could be the key development for this concept. This final report includes the evaluation and comparison of the monitored data in the past 24 months of operation. (author)

  18. Instructional Integration of Disciplines for Promoting Children's Positive Attitudes towards Plants

    Science.gov (United States)

    Çìl, Emine

    2016-01-01

    Plants are an integral part of nature. Many plant species in almost any part of the world are under serious threats due to various reasons such as deforestation, pollution--of air, water and soil--caused by industrialisation, overgrazing and rapid population growth. It is likely that people have strong positive attitudes towards conservation of…

  19. The Plant Phenology Ontology: A New Informatics Resource for Large-Scale Integration of Plant Phenology Data.

    Science.gov (United States)

    Stucky, Brian J; Guralnick, Rob; Deck, John; Denny, Ellen G; Bolmgren, Kjell; Walls, Ramona

    2018-01-01

    Plant phenology - the timing of plant life-cycle events, such as flowering or leafing out - plays a fundamental role in the functioning of terrestrial ecosystems, including human agricultural systems. Because plant phenology is often linked with climatic variables, there is widespread interest in developing a deeper understanding of global plant phenology patterns and trends. Although phenology data from around the world are currently available, truly global analyses of plant phenology have so far been difficult because the organizations producing large-scale phenology data are using non-standardized terminologies and metrics during data collection and data processing. To address this problem, we have developed the Plant Phenology Ontology (PPO). The PPO provides the standardized vocabulary and semantic framework that is needed for large-scale integration of heterogeneous plant phenology data. Here, we describe the PPO, and we also report preliminary results of using the PPO and a new data processing pipeline to build a large dataset of phenology information from North America and Europe.

  20. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  1. RATU2. The Finnish research programme on the structural integrity of nuclear power plants. Interim report 1995 - April 1997

    International Nuclear Information System (INIS)

    Solin, J.; Sarkimo, M.; Asikainen, M.

    1997-06-01

    The projects within the Finnish public funded research programme on the structural integrity of nuclear power plants (RATU2) are briefly introduced and the scientific and technical results obtained during the first two years, 1995-April 1997, are summarised in this report. The RATU2 programme was started in 1995 and will be continued until 1998. In 1996 this programme represented 6 % of the nuclear energy R and D in Finland. The research programme is mainly publicly funded and supplies impartial expertise for the regulation of nuclear energy. It also plays an important role in the education of new experts, technology transfer and international exchange of scientific results. The programme is organised into five research projects on the following topics: Material degradation in the reactor environment, Reliability of nondestructive inspections of nuclear power plants, Structural analyses for nuclear power plant components, Maintenance strategies and dependability, and Fire safety. The ageing of the structures and components in the Finnish nuclear power plants is one of the main issues to be considered when safety and economic operation of the plants is evaluated. At the same time, ways are being sought to extend the lifetime of components. The first half of the RATU2 research programme has already brought significant scientific findings and useful applications for ensuring the reliability of NPP components. New technology has been transferred to domestic use through active participation to international co-operation. On the other hand, international acceptance of the results has provided valuable feedback and benchmarking. (orig.)

  2. RATU2. The Finnish research programme on the structural integrity of nuclear power plants. Interim report 1995 - April 1997

    Energy Technology Data Exchange (ETDEWEB)

    Solin, J; Sarkimo, M; Asikainen, M [VTT Manufacturing Technology, Espoo (Finland). Materials and Structural Integrity; eds.

    1997-06-01

    The projects within the Finnish public funded research programme on the structural integrity of nuclear power plants (RATU2) are briefly introduced and the scientific and technical results obtained during the first two years, 1995-April 1997, are summarised in this report. The RATU2 programme was started in 1995 and will be continued until 1998. In 1996 this programme represented 6 % of the nuclear energy R and D in Finland. The research programme is mainly publicly funded and supplies impartial expertise for the regulation of nuclear energy. It also plays an important role in the education of new experts, technology transfer and international exchange of scientific results. The programme is organised into five research projects on the following topics: Material degradation in the reactor environment, Reliability of nondestructive inspections of nuclear power plants, Structural analyses for nuclear power plant components, Maintenance strategies and dependability, and Fire safety. The ageing of the structures and components in the Finnish nuclear power plants is one of the main issues to be considered when safety and economic operation of the plants is evaluated. At the same time, ways are being sought to extend the lifetime of components. The first half of the RATU2 research programme has already brought significant scientific findings and useful applications for ensuring the reliability of NPP components. New technology has been transferred to domestic use through active participation to international co-operation. On the other hand, international acceptance of the results has provided valuable feedback and benchmarking. (orig.). 112 refs.

  3. Integrated design of SIGMA uranium enrichment plants

    International Nuclear Information System (INIS)

    Rivarola, Martin E.; Brasnarof, Daniel O.

    1999-01-01

    In the present work, we describe a preliminary analysis of the design feedbacks in a Uranium Enrichment Plant, using the SIGMA concept. Starting from the result of this analysis, a computer code has been generated, which allows finding the optimal configurations of plants, for a fixed production rate. The computer code developed includes the model of the Thermohydraulic loop of a SIGMA module. The model contains numerical calculations of the main components of the circuit. During the calculations, the main components are dimensioned, for a posterior cost compute. The program also makes an estimation of the enrichment gain of the porous membrane, for each separation stage. Once the dimensions of the main components are known, using the enrichment cascade calculation, the capital and operation costs of the plant could be determined. At this point it is simple to calculate a leveled cost of the Separative Work Unit (SWU). A numerical optimizer is also included in the program. This optimizer finds the optimal cascade configuration, for a given set of design parameters. The whole-integrated program permits to investigate in detail the feedback in the component design. Therefore, the sensibility of the more relevant parameters can be computed, with respect of the economical variables of the plant. (author)

  4. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  5. Virtual Plant Tissue: Building Blocks for Next-Generation Plant Growth Simulation

    Directory of Open Access Journals (Sweden)

    Dirk De Vos

    2017-05-01

    Full Text Available Motivation: Computational modeling of plant developmental processes is becoming increasingly important. Cellular resolution plant tissue simulators have been developed, yet they are typically describing physiological processes in an isolated way, strongly delimited in space and time.Results: With plant systems biology moving toward an integrative perspective on development we have built the Virtual Plant Tissue (VPTissue package to couple functional modules or models in the same framework and across different frameworks. Multiple levels of model integration and coordination enable combining existing and new models from different sources, with diverse options in terms of input/output. Besides the core simulator the toolset also comprises a tissue editor for manipulating tissue geometry and cell, wall, and node attributes in an interactive manner. A parameter exploration tool is available to study parameter dependence of simulation results by distributing calculations over multiple systems.Availability: Virtual Plant Tissue is available as open source (EUPL license on Bitbucket (https://bitbucket.org/vptissue/vptissue. The project has a website https://vptissue.bitbucket.io.

  6. The integrated project as a learning experience

    Directory of Open Access Journals (Sweden)

    Maria Angeles Antequera

    2012-03-01

    Full Text Available Florida is a higher education centre specialising in technical and business training. Postgraduate programs, university qualifications, vocational training, secondary education, further education, occupational training and languages are taught at Florida. An educational model in accordance with the demands of the European Higher Education Area has been designed, focussing on teaching for professional competencies. We have chosen to use a methodology which promotes the development of skills and abilities, it promotes participation and it is student-centric as s/he must look for knowledge him/herself thus connecting the educational and the real world. In the different university degrees taught in our centre, each year the student carries out a project set in a real context which integrates specific competencies from the course subject and develops transversal competencies associated with the project which are the purpose of planning and progressive learning: team work, effective communication, conflict resolution, leadership skills, innovation and creativity. The IP counts for 25% of each course in terms of objectives, scheduling and final evaluation. The project grade is an individual grade for each student and is the same for all subjects which form part of the project.

  7. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  8. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  9. Timely integration of safeguards and security with projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Price, R.; Blount, P.M.; Garcia, S.W.; Gonzales, R.L.; Salazar, J.B.; Campbell, C.H.

    2004-01-01

    The Safeguards and Security (S and S) Requirements Integration Team at Los Alamos National Laboratory (LANL) has developed and implemented an innovative management process that will be described in detail. This process systematically integrates S and S planning into construction, facility modifications or upgrades, mission changes, and operational projects. It extends and expands the opportunities provided by the DOE project management manual, DOE M 413.3-1. Through a series of LANL documents, a process is defined and implemented that formally identifies an S and S professional to oversee, coordinate, facilitate, and communicate among the identified S and S organizations and the project organizations over the life cycle of the project. The derived benefits, namely (1) elimination/reduction of re-work or costly retrofitting, (2) overall project cost savings because of timely and improved planning, (3) formal documentation, and (4) support of Integrated Safeguards and Security Management at LANL, will be discussed. How many times, during the construction of a new facility or the modification of an existing facility, have the persons responsible for the project waited until the last possible minute or until after construction is completed to approach the security organizations for their help in safeguarding and securing the facility? It's almost like, 'Oh, by the way, do we need access control and a fence around this building and just what are we going to do with our classified anyway?' Not only is it usually difficult; it's also typically expensive to retrofit or plan for safeguards and security after the fact. Safeguards and security organizations are often blamed for budget overruns and delays in facility occupancy and program startup, but these problems are usually due to poor front-end planning. In an effort to help projects engage safeguards and security in the pre-conceptual or conceptual stages, we implemented a high level formality of operations. We

  10. Evolution of flowering strategies in Oenothera glazioviana: an integral projection model approach.

    Science.gov (United States)

    Rees, Mark; Rose, Karen E

    2002-07-22

    The timing of reproduction is a key determinant of fitness. Here, we develop parameterized integral projection models of size-related flowering for the monocarpic perennial Oenothera glazioviana and use these to predict the evolutionarily stable strategy (ESS) for flowering. For the most part there is excellent agreement between the model predictions and the results of quantitative field studies. However, the model predicts a much steeper relationship between plant size and the probability of flowering than observed in the field, indicating selection for a 'threshold size' flowering function. Elasticity and sensitivity analysis of population growth rate lambda and net reproductive rate R(0) are used to identify the critical traits that determine fitness and control the ESS for flowering. Using the fitted model we calculate the fitness landscape for invading genotypes and show that this is characterized by a ridge of approximately equal fitness. The implications of these results for the maintenance of genetic variation are discussed.

  11. Thermodynamic investigation of an integrated gasification plant with solid oxide fuel cell and steam cycles

    Energy Technology Data Exchange (ETDEWEB)

    Rokni, Masoud [Technical Univ. of Denmark, Lyngby (Denmark). Dept. of Mechanical Engineering, Thermal Energy System

    2012-07-01

    A gasification plant is integrated on the top of a solid oxide fuel cell (SOFC) cycle, while a steam turbine (ST) cycle is used as a bottoming cycle for the SOFC plant. The gasification plant was fueled by woodchips to produce biogas and the SOFC stacks were fired with biogas. The produced gas was rather clean for feeding to the SOFC stacks after a simple cleaning step. Because all the fuel cannot be burned in the SOFC stacks, a burner was used to combust the remaining fuel. The off-gases from the burner were then used to produce steam for the bottoming steam cycle in a heat recovery steam generator (HRSG). The steam cycle was modeled with a simple single pressure level. In addition, a hybrid recuperator was used to recover more energy from the HRSG and send it back to the SOFC cycle. Thus two different configurations were investigated to study the plants characteristic. Such system integration configurations are completely novel and have not been studied elsewhere. Plant efficiencies of 56% were achieved under normal operation which was considerably higher than the IGCC (Integrated Gasification Combined Cycle) in which a gasification plant is integrated with a gas turbine and a steam turbine. Furthermore, it is shown that under certain operating conditions, plant efficiency of about 62 is also possible to achieve. (orig.)

  12. Data integration for plant genomics--exemplars from the integration of Arabidopsis thaliana databases.

    Science.gov (United States)

    Lysenko, Artem; Lysenko, Atem; Hindle, Matthew Morritt; Taubert, Jan; Saqi, Mansoor; Rawlings, Christopher John

    2009-11-01

    The development of a systems based approach to problems in plant sciences requires integration of existing information resources. However, the available information is currently often incomplete and dispersed across many sources and the syntactic and semantic heterogeneity of the data is a challenge for integration. In this article, we discuss strategies for data integration and we use a graph based integration method (Ondex) to illustrate some of these challenges with reference to two example problems concerning integration of (i) metabolic pathway and (ii) protein interaction data for Arabidopsis thaliana. We quantify the degree of overlap for three commonly used pathway and protein interaction information sources. For pathways, we find that the AraCyc database contains the widest coverage of enzyme reactions and for protein interactions we find that the IntAct database provides the largest unique contribution to the integrated dataset. For both examples, however, we observe a relatively small amount of data common to all three sources. Analysis and visual exploration of the integrated networks was used to identify a number of practical issues relating to the interpretation of these datasets. We demonstrate the utility of these approaches to the analysis of groups of coexpressed genes from an individual microarray experiment, in the context of pathway information and for the combination of coexpression data with an integrated protein interaction network.

  13. Angra 1 nuclear power plant full scope simulator development project

    Energy Technology Data Exchange (ETDEWEB)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da, E-mail: edsel@eletronuclear.gov.br, E-mail: lccast@eletronuclear.gov.br, E-mail: nilogar@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (SCO/ELETRONUCLEAR), Angra dos Reis, RJ (Brazil). Superintendencia de Coordenacao da Operacao; Zazo, Francisco Javier Lopez; Ruiz, Jose Antonio, E-mail: jlopez@tecnatom.es, E-mail: jaruiz@tecnatom.es [Tecnatom S.A., San Sebastian de los Reyes, Madrid (Spain)

    2015-07-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  14. Angra 1 nuclear power plant full scope simulator development project

    International Nuclear Information System (INIS)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da

    2015-01-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  15. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  16. Integrated waste hydrogen utilization project

    International Nuclear Information System (INIS)

    Armstrong, C.

    2004-01-01

    'Full text:' The BC Hydrogen Highway's, Integrated Waste Hydrogen Utilization Project (IWHUP) is a multi-faceted, synergistic collaboration that will capture waste hydrogen and promote its use through the demonstration of 'Hydrogen Economy' enabling technologies developed by Canadian companies. IWHUP involves capturing and purifying a small portion of the 600 kg/hr of by-product hydrogen vented to the atmosphere at the ERCO's electrochemical sodium chlorate plant in North Vancouver, BC. The captured hydrogen will then be compressed so it is suitable for transportation on roadways and can be used as a fuel in transportation and stationary fuel cell demonstrations. In summary, IWHUP invests in the following; Facilities to produce up to 20kg/hr of 99.999% pure 6250psig hydrogen using QuestAir's leading edge Pressure Swing Absorption technology; Ultra high-pressure transportable hydrogen storage systems developed by Dynetek Industries, Powertech Labs and Sacre-Davey Engineering; A Mobile Hydrogen Fuelling Station to create Instant Hydrogen Infrastructure for light-duty vehicles; Natural gas and hydrogen (H-CNG) blending and compression facilities by Clean Energy for fueling heavy-duty vehicles; Ten hydrogen, internal combustion engine (H-ICE), powered light duty pick-up vehicles and a specialized vehicle training, maintenance, and emissions monitoring program with BC Hydro, GVRD and the District of North Vancouver; The demonstration of Westport's H-CNG technology for heavy-duty vehicles in conjunction with local transit properties and a specialized vehicle training, maintenance, and emissions monitoring program; The demonstration of stationary fuel cell systems that will provide clean power for reducing peak-load power demands (peak shaving), grid independence and water heating; A comprehensive communications and outreach program designed to educate stakeholders, the public, regulatory bodies and emergency response teams in the local community, Supported by industry

  17. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  18. Research on integrated managing system based on CIMS for nuclear power plant safety

    International Nuclear Information System (INIS)

    Zhou Gang

    2006-01-01

    In order to improve safety, economy and reliability of operation for nuclear power plant (NPP), a novel integrated managing method was proposed based on the ideas of computer and contemporary integrated manufacturing system (CIMS). The application of CIMS to nuclear power plant safety management was researched. In order to design an integrated managing system to meet the needs of NPP safety management, all work related to nuclear safety is divided into different category according to its characters. On basis of this work, general integrated managing system was designed at first. Then subsystems were designed and every subsystem implements a category of nuclear safety management work. All subsystems are independent relatively on the one hand and are interrelated on other hand by global information system. (authors)

  19. Project Integration Architecture

    Science.gov (United States)

    Jones, William Henry

    2008-01-01

    The Project Integration Architecture (PIA) is a distributed, object-oriented, conceptual, software framework for the generation, organization, publication, integration, and consumption of all information involved in any complex technological process in a manner that is intelligible to both computers and humans. In the development of PIA, it was recognized that in order to provide a single computational environment in which all information associated with any given complex technological process could be viewed, reviewed, manipulated, and shared, it is necessary to formulate all the elements of such a process on the most fundamental level. In this formulation, any such element is regarded as being composed of any or all of three parts: input information, some transformation of that input information, and some useful output information. Another fundamental principle of PIA is the assumption that no consumer of information, whether human or computer, can be assumed to have any useful foreknowledge of an element presented to it. Consequently, a PIA-compliant computing system is required to be ready to respond to any questions, posed by the consumer, concerning the nature of the proffered element. In colloquial terms, a PIA-compliant system must be prepared to provide all the information needed to place the element in context. To satisfy this requirement, PIA extends the previously established object-oriented- programming concept of self-revelation and applies it on a grand scale. To enable pervasive use of self-revelation, PIA exploits another previously established object-oriented-programming concept - that of semantic infusion through class derivation. By means of self-revelation and semantic infusion through class derivation, a consumer of information can inquire about the contents of all information entities (e.g., databases and software) and can interact appropriately with those entities. Other key features of PIA are listed.

  20. Issues of integrating high-tech concepts into nuclear power plant operation

    International Nuclear Information System (INIS)

    Kisner, R.A.; Carter, R.J.; Lindsay, R.W.

    1990-01-01

    The stockpile of new ideas continues to grow for monitoring nuclear power plant parameters, characteristics, and vital signs and for controlling systems, subsystems, and components. This wide selection of monitoring and control software increases the difficulty of designing an integrated control room. As plant control room operators increase their reliance on computerized systems, including real-time plant data and data base systems, the integration of monitoring, diagnostics, and control software into uniform and seamless environment becomes imperative. A systematic approach to evaluating the usefulness of such high-tech control concepts is needed. This paper concentrates on methods to evaluate control concepts by assessing factors that determine a system's potential effectiveness within the context of the overall environment, including both human and machine components. Although not an in-depth study, this paper serves to outline several measures of utility. 21 refs., 3 figs., 2 tabs

  1. Sustainable integration of EU research in severe accident phenomenology and management (SARNET2 project)

    International Nuclear Information System (INIS)

    Van Dorsselaere, Jean-Pierre; Albiol, Thierry; Chaumont, Bernard; Haste, Tim; Journeau, Christophe; Meyer, Leonhard; Sehgal, Bal Raj; Schwinges, Bernd; Beraha, David; Annunziato, Alessandro; Zeyen, Roland

    2010-01-01

    In order to optimise the use of the available means and to constitute sustainable research groups in the European Union, the Severe Accident Research NETwork of Excellence (SARNET) has gathered 51 organisations representing most of the actors involved in Severe Accident (SA) research in Europe plus Canada. This project was co-funded by the European Commission (EC) under the 6th Euratom Framework Programme. Its objective was to resolve the most important pending issues for enhancing, in regard of SA, the safety of existing and future Nuclear Power Plants (NPPs). SARNET tackled the fragmentation that existed between the national R and D programmes, in defining common research programmes and developing common computer codes for safety assessment. The Joint Programme of Activities consisted in: (i) Implementing an advanced communication tool for accessing all project information, fostering exchange of information, and managing documents; (ii) Harmonizing and re-orienting the research programmes, and defining new ones; (iii) Analyzing the experimental results provided by research programmes in order to elaborate a common understanding of relevant phenomena; (iv) Developing the ASTEC code (integral computer code used to predict the NPP behaviour during a postulated SA) by integrating the knowledge produced within SARNET; (v) Developing Scientific Databases, in which the results of research experimental programmes are stored in a common format; (vi) Developing a common methodology for Probabilistic Safety Assessment of NPPs; (vii) Developing short courses and writing a text book on Severe Accidents for students and researchers; (viii) Promoting personnel mobility amongst various European organizations. This paper presents the major achievements after four and a half years of operation of the network, in terms of knowledge gained, of improvements of the ASTEC reference code, of dissemination of results and of integration of the research programmes conducted by the various

  2. Integrated Mid-Continent Carbon Capture, Sequestration & Enhanced Oil Recovery Project

    Energy Technology Data Exchange (ETDEWEB)

    Brian McPherson

    2010-08-31

    A consortium of research partners led by the Southwest Regional Partnership on Carbon Sequestration and industry partners, including CAP CO2 LLC, Blue Source LLC, Coffeyville Resources, Nitrogen Fertilizers LLC, Ash Grove Cement Company, Kansas Ethanol LLC, Headwaters Clean Carbon Services, Black & Veatch, and Schlumberger Carbon Services, conducted a feasibility study of a large-scale CCS commercialization project that included large-scale CO{sub 2} sources. The overall objective of this project, entitled the 'Integrated Mid-Continent Carbon Capture, Sequestration and Enhanced Oil Recovery Project' was to design an integrated system of US mid-continent industrial CO{sub 2} sources with CO{sub 2} capture, and geologic sequestration in deep saline formations and in oil field reservoirs with concomitant EOR. Findings of this project suggest that deep saline sequestration in the mid-continent region is not feasible without major financial incentives, such as tax credits or otherwise, that do not exist at this time. However, results of the analysis suggest that enhanced oil recovery with carbon sequestration is indeed feasible and practical for specific types of geologic settings in the Midwestern U.S.

  3. Naturkraft integration at Kaarstoe. Mapping study report 6 march 2009

    Energy Technology Data Exchange (ETDEWEB)

    Odland, Oeystein; Hoeie, Hans; Aanestad, Per; Hauge, Bjoern I.; Solvang, Svein; Boee, Stein Espen; Lervik, Steinar; Kristiansen, Arild

    2007-07-01

    Gassco is engaged in three different studies and projects related to reduce CO{sub 2} emissions at Kaarstoe; 1. Gassnova's CO{sub 2} capture, transport and storage projects at Kaarstoe and Mongstad (the CO{sub 2} Transportation Network), where Gassco role is to mature the transportation facilities of the project. An investment decision is planned for second half of 2009. 2. The Kaarstoe Flue Gas Capture pre-feasibility study initiated by the MPE to Gassco as operator of Gassled in connection with approval of the Kaarstoe Expansion Project 2010, to evaluate the potential of capturing the CO{sub 2} emissions at the Kaarstoe gas processing plant, and reported to the MPE 3 March 2009, and 3. This Naturkraft Integration Mapping Study initiated by MPE to meet the requirements set out by the letter to Gassco dated 3 December 2008 to evaluate possibilities to integrate existing Naturkraft's power plant with the Kaarstoe gas processing plant. In this Naturkraft Integration Study report Gassco has identified potential degrees of integration and resulting impact with respect to performance of both the Naturkraft power plant and the Kaarstoe gas processing plant. A major concern related to operations of the Kaarstoe gas processing plant is the regularity and availability issues related to natural gas and NGL export. The value of the petroleum transported over Kaarstoe on any day exceeds 200 million NOK. In addition also significant oil production will be shut down if the Kaarstoe gas processing plant is not operating. Hence the regularity of energy supply including steam is of utmost importance. The integration between Naturkraft and the gas processing plant is based on supplying energy (i.e. fuel gas, steam, heat and electricity) from Naturkraft's existing power plant, and therefore must be based on predictable and steady operations of the Naturkraft power plant. Naturkraft has only been in operation for a few weeks from the start-up of the power plant 1

  4. Emissions from decentralised CHP plants 2007 - Energinet.dk Environmental project no. 07/1882

    DEFF Research Database (Denmark)

    Nielsen, Malene; Nielsen, Ole-Kenneth; Thomsen, Marianne

    Updated emission factors for decentralised combined heat and power (CHP) plants with a capacity project emission measurements as well as emission measurements performed in recent years that were collected. The emission factors valid for 2006/2007 have been...... estimated for the plant technologies: Municipal solid waste (MSW) incineration plants, plants combusting straw or wood, natural gas fuelled reciprocating engines, biogas fuelled engines, natural gas fuelled gas turbines, gas oil fuelled reciprocating engines, gas oil fuelled gas turbines, steam turbines...

  5. Slovakia, the Gabcikovo-Nagymaros Project; and Central European integration

    International Nuclear Information System (INIS)

    Lejon, E.

    1996-01-01

    In this chapter of the book author deals with the economic, social, ecological and cultural problems in connection of the Gabcikovo-Nagymaros Project (GNP) with the integration process of the 12 European Communities countries. Slovakia - sometimes also called the corridor between the East and the West - appears to have great potential as a link in the general east-west integration. Such a role could be further reinforced by the close and purposeful cooperation between Slovakia, Hungary, Slovenia, Austria and Bavaria, and it could have a positive signal effect for the whole of Central Europe, as well as for Europe in general. However, this is possible only provided that the former COMECON countries will reduce their tendency to compete for western attention and they will begin, to a larger extent, to lay down the foundations for the indisputable benefits accruing to their population from cooperation and integration. In this respect, the GNP appears to be a crucial issue an the social and political decision on the completion of the Project would become a signal that Central Europe has entered the path towards becoming one of the most important regions of Europe

  6. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-09-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR’06 are highlighted, and the future of the two projects is discussed.

  7. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-01-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR-06 are highlighted, and the future of the two projects is discussed

  8. Integration of renewable energies into the German power system and their influence on investments in new power plants. Integrated consideration of effects on power plant investment and operation

    Energy Technology Data Exchange (ETDEWEB)

    Harthan, Ralph Oliver

    2015-01-14

    The increasing share of renewable energies in the power sector influences the economic viability of investments in new conventional power plants. Many studies have investigated these issues by considering power plant operation or the long-term development of the power plant fleet. However, power plant decommissioning, investment and operation are intrinsically linked. This doctoral thesis therefore presents a modelling framework for an integrated consideration of power plant decommissioning, investment and operation. In a case study focusing on Germany, the effects of the integration of renewable energies on power plant decommissioning, investment and operation are evaluated in the context of different assumptions regarding the remaining lifetime of nuclear power plants. With regard to the use of nuclear power, a phase-out scenario and a scenario with lifetime extension of nuclear power plants (by on average 12 years) are considered. The results show that static decommissioning (i.e. considering fixed technical lifetimes) underestimates the capacity available in the power sector in the scenario without lifetime extension since retrofit measures (versus decommissioning) are not taken into account. In contrast, capacity available in the case of nuclear lifetime extension is overestimated since mothballing (versus regular operation) is not considered. If the impact on decommissioning decisions of profit margins accrued during power plant operation are considered (''dynamic decommissioning''), the electricity price reduction effect due to a lifetime extension is reduced by more than half in comparison to static decommissioning. Scarcity situations do not differ significantly between the scenarios with and without lifetime extension with dynamic decommissioning; in contrast, there is a significantly higher need for imports without lifetime extension with static decommissioning. The case study demonstrates that further system flexibility is needed for

  9. Integration of renewable energies into the German power system and their influence on investments in new power plants. Integrated consideration of effects on power plant investment and operation

    International Nuclear Information System (INIS)

    Harthan, Ralph Oliver

    2015-01-01

    The increasing share of renewable energies in the power sector influences the economic viability of investments in new conventional power plants. Many studies have investigated these issues by considering power plant operation or the long-term development of the power plant fleet. However, power plant decommissioning, investment and operation are intrinsically linked. This doctoral thesis therefore presents a modelling framework for an integrated consideration of power plant decommissioning, investment and operation. In a case study focusing on Germany, the effects of the integration of renewable energies on power plant decommissioning, investment and operation are evaluated in the context of different assumptions regarding the remaining lifetime of nuclear power plants. With regard to the use of nuclear power, a phase-out scenario and a scenario with lifetime extension of nuclear power plants (by on average 12 years) are considered. The results show that static decommissioning (i.e. considering fixed technical lifetimes) underestimates the capacity available in the power sector in the scenario without lifetime extension since retrofit measures (versus decommissioning) are not taken into account. In contrast, capacity available in the case of nuclear lifetime extension is overestimated since mothballing (versus regular operation) is not considered. If the impact on decommissioning decisions of profit margins accrued during power plant operation are considered (''dynamic decommissioning''), the electricity price reduction effect due to a lifetime extension is reduced by more than half in comparison to static decommissioning. Scarcity situations do not differ significantly between the scenarios with and without lifetime extension with dynamic decommissioning; in contrast, there is a significantly higher need for imports without lifetime extension with static decommissioning. The case study demonstrates that further system flexibility is needed for

  10. Meeting of Experts on NASA's Unmanned Aircraft System (UAS) Integration in the National Airspace Systems (NAS) Project

    Science.gov (United States)

    Wolfe, Jean; Bauer, Jeff; Bixby, C.J.; Lauderdale, Todd; Shively, Jay; Griner, James; Hayhurst, Kelly

    2010-01-01

    Topics discussed include: Aeronautics Research Mission Directorate Integrated Systems Research Program (ISRP) and UAS Integration in the NAS Project; UAS Integration into the NAS Project; Separation Assurance and Collision Avoidance; Pilot Aircraft Interface Objectives/Rationale; Communication; Certification; and Integrated Tests and Evaluations.

  11. Integrated information system for analysis of nuclear power plants

    International Nuclear Information System (INIS)

    Galperin, A.

    1994-01-01

    Performing complicated engineering analyses of a nuclear power plant requires storage and manipulation of a large amount of information, both data and knowledge. This information is characterized by its multidisciplinary nature, complexity, and diversity. The problems caused by inefficient and lengthy manual operations involving the data flow management within the frame-work of the safety-related analysis of a power plant can be solved by applying the computer aided engineering principles. These principles are the basis of the design of an integrated information storage system (IRIS). The basic idea is to create a computerized environment, which includes both database and functional capabilities. Consideration and analysis of the data types and required data manipulation capabilities as well as operational requirements, resulted in the choice of an object-oriented data-base management system (OODBMS) as a development platform for solving the software engineering problems. Several advantages of OODBMSs over conventional relations database systems were found of crucial importance, especially providing the necessary flexibility for different data types and extensibility potential. A detailed design of a data model is produced for the plant technical data and for the storage of analysis results. The overall system architecture was designed to assure the feasibility of integrating database capabilities with procedures and functions written in conventional algorithmic programming languages

  12. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  13. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    International Nuclear Information System (INIS)

    Kosonen, M.; Hakola, M.

    2012-01-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  14. Integrated project delivery methods for energy renovation of social housing

    Directory of Open Access Journals (Sweden)

    Tadeo Baldiri Salcedo Rahola

    2015-11-01

    renting them. As such, SHOs are used to dealing with renovations on a professional basis. The limited financial capacity of SHOs to realise energy renovations magnifies the importance of improving process performance in order to get the best possible outcomes. In the last 30 years numerous authors have addressed the need to improve the performance of traditional construction processes via alternative project delivery methods. However, very little is known about the specifics of renovations processes for social housing, the feasibility of applying innovative construction management methods and the consequences for the process, for the role of all the actors involved and for the results of the projects. The aim of this study is to provide an insight into the project delivery methods available for SHOs when they are undertaking energy renovation projects and to evaluate how these methods could facilitate the achievement of a higher process performance. The main research question is: How can Social Housing Organisations improve the performance of energy renovation processes using more integrated project delivery methods? The idea of a PhD thesis about social housing renovation processes originated from the participation of TU Delft as research partner in the Intelligent Energy Europe project SHELTER1 which was carried out between 2010 and 2013. The aim of the SHELTER project was to promote and facilitate the use of new models of cooperation, inspired by integrated design, for the energy renovation of social housing. The SHELTER project was a joint effort between six social housing organisations (Arte Genova, Italy; Black Country Housing Group, United Kingdom; Bulgarian Housing Association, Bulgaria; Dynacité, France; Logirep, France and Société Wallonne du Logement, Belgium, three European professional federations based in Brussels (Architects Council of Europe, Cecodhas Housing Europe and European Builders Confederation and one research partner (Delft University of

  15. Learning about the Earth through Societally-relevant Interdisciplinary Research Projects: the Honours Integrated Science Program at McMaster

    Science.gov (United States)

    Eyles, C.; Symons, S. L.; Harvey, C. T.

    2016-12-01

    Students in the Honours Integrated Science (iSci) program at McMaster University (Hamilton, Ontario, Canada) learn about the Earth through interdisciplinary research projects that focus on important societal issues. The iSci program is a new and innovative undergraduate program that emphasizes the links between scientific disciplines and focuses on learning through research and the development of scientific communication skills. The program accepts up to 60 students each year and is taught by a team of 18 instructors comprising senior and junior faculty, post-doctoral fellows, a lab coordinator, instructional assistant, a librarian and library staff, and an administrator. The program is designed around a pedagogical model that emphasizes hands-on learning through interdisciplinary research (Research-based Integrated Education: RIE) and is mostly project-based and experiential. In their freshman year students learn fundamental Earth science concepts (in conjunction with chemistry, physics, mathematics and biology) through research projects focused on environmental contamination, interplanetary exploration, the effect of drugs on the human body and environment, sustainable energy, and cancer. In subsequent years they conduct research on topics such as the History of the Earth, Thermodynamics, Plant-Animal Interactions, Wine Science, Forensics, and Climate Change. The iSci program attracts students with a broad interest in science and has been particularly effective in directing high quality students into the Earth sciences as they are introduced to the discipline in their first year of study through research projects that are interesting and stimulating. The structure of the iSci program encourages consideration of geoscientific applications in a broad range of societally relevant research projects; these projects are reviewed and modified each year to ensure their currency and ability to meet program learning objectives.

  16. Beyond ectomycorrhizal bipartite networks: projected networks demonstrate contrasted patterns between early- and late-successional plants in Corsica.

    Directory of Open Access Journals (Sweden)

    Adrien eTaudiere

    2015-10-01

    Full Text Available The ectomycorrhizal (ECM symbiosis connects mutualistic plants and fungal species into bipartite networks. While links between one focal ECM plant and its fungal symbionts have been widely documented, systemic views of ECM networks are lacking, in particular, concerning the ability of fungal species to mediate indirect ecological interactions between ECM plant species (projected-ECM networks. We assembled a large dataset of plant-fungi associations at the species level and at the scale of Corsica using molecular data and unambiguously host-assigned records to: (i examine the correlation between the number of fungal symbionts of a plant species and the average specialization of these fungal species, (ii explore the structure of the plant-plant projected network and (iii compare plant association patterns in regard to their position along the ecological succession. Our analysis reveals no trade-off between specialization of plants and specialization of their partners and a saturation of the plant projected network. Moreover, there is a significantly lower-than-expected sharing of partners between early- and late-successional plant species, with fewer fungal partners for early-successional ones and similar average specialization of symbionts of early- and late-successional plants. Our work paves the way for ecological readings of Mediterranean landscapes that include the astonishing diversity of below-ground interactions.

  17. Taking Responsibility: The integration of Sustainability and Project Management

    NARCIS (Netherlands)

    Jasper van den Brink; Gilbert Gilbert Silvius

    2011-01-01

    Sustainability is one of the most important challenges of our time. How can we develop prosperity, without compromising the life of future generations? Companies are integrating ideas of sustainability in their marketing, corporate communications, annual reports and in their actions. Projects as

  18. Cost benefit analysis of power plant database integration

    International Nuclear Information System (INIS)

    Wilber, B.E.; Cimento, A.; Stuart, R.

    1988-01-01

    A cost benefit analysis of plant wide data integration allows utility management to evaluate integration and automation benefits from an economic perspective. With this evaluation, the utility can determine both the quantitative and qualitative savings that can be expected from data integration. The cost benefit analysis is then a planning tool which helps the utility to develop a focused long term implementation strategy that will yield significant near term benefits. This paper presents a flexible cost benefit analysis methodology which is both simple to use and yields accurate, verifiable results. Included in this paper is a list of parameters to consider, a procedure for performing the cost savings analysis, and samples of this procedure when applied to a utility. A case study is presented involving a specific utility where this procedure was applied. Their uses of the cost-benefit analysis are also described

  19. A basic framework for managing time of nuclear plant projects

    International Nuclear Information System (INIS)

    Beck, J.R.

    1987-01-01

    One of the crucial problems that faces managers of nuclear power plant projects is how to obtain more effective and efficient utilization of their company's resources. Analysis of this problem showed that improvement was necessary in the time management area. Time management is one of the primary functions of project groups. Much has been written about planning and scheduling, and there are many modern techniques (CPM, PERT, etc.) available to a project group to manage time. So, why is time management still a problem? One reason is that nuclear projects are generally very complex and involve many organizations requiring the same resources. It is the intent of this paper to present a comprehensive and basic framework on which to either build a time management system or use as a basis to assess an existing system

  20. Model for impact assessment in human factors engineering project of PWR plants with digital control

    International Nuclear Information System (INIS)

    Roedel, Frederico G.; Schirru, Roberto

    2017-01-01

    New nuclear power plants are being designed with the digital Instrumentation and Control (I and C) as the backbone for the functions of protection, control, monitoring and display and with digital Human-System Interface (HSI). In this new environment, rather than play physical control actions, the operators begin to act as decision makers and, within this context, the Human Factors Engineering (HFE) has become an integral part of the projects. As the operational experience with the use of digital I and C systems and HSI is limited since, besides the small number of applications, it is proprietary, the objective of this work is to carry out an assessment in order to identify the most relevant aspects of a digital HSI project. The proposed model is based on concepts of fuzzy logic, uses MATLAB for data processing, defines criteria for evaluation and quantification of impacts in the project and has been applied to the General Principles and the Guidelines presented in the NUREG-0700. The assessment indicated that the Guidelines for User-Interface Interaction and Management, for Information Display and for Computer-Based Procedures System should be carefully evaluated in the design of a digital HSI considering the new Users Tasks Demand, the Organization of HSI Elements and the Work Environment. (author)

  1. Model for impact assessment in human factors engineering project of PWR plants with digital control

    Energy Technology Data Exchange (ETDEWEB)

    Roedel, Frederico G.; Schirru, Roberto, E-mail: froedel@nuclear.ufrj.br, E-mail: schirru@lmp.ufrj.br [Coordenacao de Pos-Graduacao e Pesquisa de Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Departamento de Engenharia Nuclear

    2017-07-01

    New nuclear power plants are being designed with the digital Instrumentation and Control (I and C) as the backbone for the functions of protection, control, monitoring and display and with digital Human-System Interface (HSI). In this new environment, rather than play physical control actions, the operators begin to act as decision makers and, within this context, the Human Factors Engineering (HFE) has become an integral part of the projects. As the operational experience with the use of digital I and C systems and HSI is limited since, besides the small number of applications, it is proprietary, the objective of this work is to carry out an assessment in order to identify the most relevant aspects of a digital HSI project. The proposed model is based on concepts of fuzzy logic, uses MATLAB for data processing, defines criteria for evaluation and quantification of impacts in the project and has been applied to the General Principles and the Guidelines presented in the NUREG-0700. The assessment indicated that the Guidelines for User-Interface Interaction and Management, for Information Display and for Computer-Based Procedures System should be carefully evaluated in the design of a digital HSI considering the new Users Tasks Demand, the Organization of HSI Elements and the Work Environment. (author)

  2. North Plant co-generation project for South Davis County Sewer Improvement District

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, L.S. [Aqua Environmental Services, Inc., Bountiful, UT (United States)

    1993-12-31

    In the summer of 1988, the South Davis County Sewer Improvement District (SDCSID) learned of a grant/loan program being administered by the Utah State Department of Energy(DOE) for projects that demonstrate new and innovative ways of conserving energy or utilizing renewable energy sources. The SDCSID applied for and received from the DOE both a grant and a no-interest loan to finance half of the cost of a co-generation project at the North Wastewater Treatment Plant. This co-generation project utilizes methane gas, a by-product of the anaerobic digestion process, to generate both electricity and heat that is used at the plant. The SDCSID calculated that at the current anaerobic gas production rate, a 140 KW engine generator could be run almost 24 hours a day. Approximately 75% of the current electrical needs at the North Plant are supplied by the 140 KW engine generator. Also, all of the heat necessary to raise the temperature of the incoming sludge to 95{degrees}F, and to heat four large buildings is supplied from the heat recovery system of the engine. The system utilizes an induction type generator to supply electricity, which is somewhat simpler to design and less expensive to install than a synchronous type system. An induction system utilizes the Electrical Utility`s incoming power to excite the generator to correct the phase so that is can be used by the loads in the plant. In addition, the SDCSID installed a second identical engine generator as a back-up and to peak shave. Plant effluent is used to cool the engines instead of air-cooling through radiators.

  3. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  4. The plant-parasitic nematode collections of RRIP: The realization of an ISTC project

    Science.gov (United States)

    Plant-parasitic nematodes are important pests of agricultural and wild plants throughout Russia and the world. The best strategy for management of nematode damage is an integrated approach to the problem: i.e., the use of agrotechnological approaches (crop rotation, soil amendments, etc.), reasonabl...

  5. Technical and economic analysis of integrating low-medium temperature solar energy into power plant

    International Nuclear Information System (INIS)

    Wang, Fu; Li, Hailong; Zhao, Jun; Deng, Shuai; Yan, Jinyue

    2016-01-01

    Highlights: • Seven configurations were studied regarding the integration of solar thermal energy. • Economic analysis was conducted on new built plants and retrofitted power plants. • Using solar thermal energy to preheat high pressure feedwater shows the best performance. - Abstract: In order to mitigate CO_2 emission and improve the efficiency of the utilization of solar thermal energy (STE), solar thermal energy is proposed to be integrated into a power plant. In this paper, seven configurations were studied regarding the integration of STE. A 300 MWe subcritical coal-fired plant was selected as the reference, chemical absorption using monoethanolamine solvent was employed for CO_2 ​capture, and parabolic trough collectors and evacuated tube collectors were used for STE collection. Both technical analysis and economic evaluation were conducted. Results show that integrating solar energy with post-combustion CO_2​ capture can effectively increase power generation and reduce the electrical efficiency penalty caused by CO_2 capture. Among the different configurations, Config-2 and Config-6, which use medium temperature STE to replace high pressure feedwater without and with CO_2 capture, show the highest net incremental solar efficiency. When building new plants, integrating solar energy can effectively reduce the levelized cost of electricity (LCOE). The lowest LCOE, 99.28 USD/MWh, results from Config-6, with a parabolic trough collector price of 185 USD/m"2. When retrofitting existing power plants, Config-6 also shows the highest net present value (NPV), while Config-2 has the shortest payback time at a carbon tax of 50 USD/ton CO_2. In addition, both LCOE and NPV/payback time are clearly affected by the relative solar load fraction, the price of solar thermal collectors and the carbon tax. Comparatively, the carbon tax can affect the configurations with CO_2 capture more clearly than those without CO_2 capture.

  6. Compost plant of Medellin - An economically viable project

    International Nuclear Information System (INIS)

    Bedoya V, Julian; Arango M, Carlos Andres

    1999-01-01

    The solid waste treatment facility of Empresas Varias de Medellln started operation of the 70's. The total investment in equipment and construction by 1971 was of about $ 36'000. 000 Colombian pesos, that by 1997 was valued at more than seven thousand million pesos $7.000'000. 000). The solid waste treatment facility was able to process 180 t/day, generating compost and recyclable by products (textile fibbers. paper, cardboard, glass, plastics, scrap metals) with commercial value. Operating expenses for the facility in 1972 were $2'187.742 to process 53.300 t/year in 296 working days. Revenues from compost and recyclable by products were $ 8 '791.280, with a positive balance of $ 6 '603.538. For those years debt annual payments were $ 3'919.372, giving a yearly profit of $ 2'684.165. Instead of debt payments a yearly charge of $ 7 '315. 240 can be made to account for equipment and construction costs; in addition land rent of $ 500000 per year should be charged to the plant. in this case the operational loss is of $ 1' 397.663 ($ 26/ t) that has to be covered by solid waste service charges. Under these conditions the project is not economically feasible, especially if taking solid wastes to Moravia has not cost at all. Twenty-five years later situation is different: transportation and final disposal costs in Curva de Rodas amount to more than $ 19. 000/t. expected total revenues for a similar project in 1997 could be $2.778' 000.000 and operational expenses for 365 days are estimated at $ 506' 000.000; yearly annual cost for construction and equipment amounts to $1. 411' 000.000 and land rental of $96'000.000 give a profit of close to $765 '000.000. Under these conditions the project is economically feasible and generates a profit: it may be even more attractive if the solid waste company pays a disposal fee, since it is saving room in Curva de Rodas. In order to obtain fully feasibility of the project requires: compost must be improved and positioned in the market

  7. Data base on dose reduction research projects for nuclear power plants

    International Nuclear Information System (INIS)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K.

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report

  8. Case study of the interdisciplinary integration in an IST-E3 project

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik

    2002-01-01

    Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission.......Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission....

  9. Baseline survey for rare plant species and native plant communities within the Kamehameha Schools 'Lupea Safe Harbor Planning Project Area, North Kona District, Island of Hawai'i

    Science.gov (United States)

    Jacobi, James; Warshauer, F. R.; Price, Jonathan

    2010-01-01

    Kamehameha Schools, in conjunction with several federal, state, and private organizations, has proposed to conduct conservation management on approximately 5,340 ha (~13,200 acres) of land they own in the vicinity of Kīpukalupea in the North Kona District on the island of Hawai'i. The goal of this program is to restore and enhance the habitat to benefit native plant and animal populations that are currently, or were formerly, found in this site. The initial phase of this project has been focused on various activities including conducting baseline surveys for bird and plant species so Kamehameha Schools could develop a Safe Harbor Agreement (SHA) for the proposed project lands relative to the habitat management and species reintroduction efforts they would like to conduct in the Lupea Project area. This report summarizes methods that were used to collect field data on plant species and communities within the project area, and the results of that initial survey. The information was used to calculate baseline values for all listed threatened or endangered plant species found, or expected to be found, within the project area, and to design a monitoring program to assess changes in plant communities and rare plant species relative to management activities over the duration of the SHA.

  10. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  11. Integrating Botany with Chemistry & Art to Improve Elementary School Children's Awareness of Plants

    Science.gov (United States)

    Çil, Emine

    2015-01-01

    Students need to be aware of plants in order to learn about, appreciate, care for, and protect them. However, research has found that many children are not aware of the plants in their environment. A way to address this issue might be integration of plants with various disciplines. I investigated the effectiveness of an instructional approach…

  12. Bid Preparation and Evaluation for Nuclear Power Plant Project Management

    International Nuclear Information System (INIS)

    Mohd Idris Taib, Mohd Khairulezwan Abdul Manan and Nur Farizan Amadzun

    2011-01-01

    Bid preparation and evaluation is one of the main activities in Nuclear Power Plant Project management. International Atomic Energy Agency guide and Korean experience was studied for Malaysian requirement in realization of first Nuclear Power Plant. Several aspects shall be taken into consideration such as political scenario, financial capabilities, sitting, human resource, technologies, fuel supplies and decommissioning for long term exceeded hundred years. Bidding process and activities is proposed for our country requirement. The main activities included but unlimited to Bid Invitation Specification, Bid Evaluation Process, Technical Evaluation, Economic Bid Evaluation and Contracting. On the end of day, Malaysia need safe and reliable Nuclear Power Plant. Malaysian Economic Transformation Programme also get benefit from spin-off localization products and services as well as Technology Transfer Programme. (author)

  13. Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1993-12-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant

  14. The Structural Integrity Centre

    International Nuclear Information System (INIS)

    Tomkins, B.

    1987-01-01

    The paper concerns the development and work of the Structural Integrity Centre (SIC) at Risley Nuclear Laboratories, United Kingdom. The centre was set up to provide authoritative advice to plant designers and operators on the integrity and life assessment of structures and components across the reactor projects in the United Kingdom. A description is given of the structure and role of the SIC, as well as the Structural Integrity Assessment work. The assessment methods are described for thermally loaded structures and welded structures. Finally, defect significance assessment and environmental effects are outlined. (U.K.)

  15. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    Science.gov (United States)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  16. Dustfall design of open coal yard in the power plant-a case study on the closed reconstruction project of coal storage yard in shengli power plant

    Science.gov (United States)

    Wang, Kunpeng; Ji, Weidong; Zhang, Feifei; Yu, Wei; Zheng, Runqing

    2018-02-01

    This thesis, based on the closed reconstruction project of the coal storage yard of Shengli Power Plant which is affiliated to Sinopec Shengli Petroleum Administration, first makes an analysis on the significance of current dustfall reconstruction of open coal yard, then summarizes the methods widely adopted in the dustfall of large-scale open coal storage yard of current thermal power plant as well as their advantages and disadvantages, and finally focuses on this project, aiming at providing some reference and assistance to the future closed reconstruction project of open coal storage yard in thermal power plant.

  17. Exergy analysis of a combined heat and power plant with integrated lignocellulosic ethanol production

    DEFF Research Database (Denmark)

    Lythcke-Jørgensen, Christoffer Ernst; Haglind, Fredrik; Clausen, Lasse Røngaard

    2014-01-01

    production. An exergy analysis is carried out for a modelled polygeneration system in which lignocellulosic ethanol production based on hydrothermal pretreatment is integrated in an existing combined heat and power (CHP) plant. The ethanol facility is driven by steam extracted from the CHP unit when feasible...... district heating production in the ethanol facility. The results suggest that the efficiency of integrating lignocellulosic ethanol production in CHP plants is highly dependent on operation, and it is therefore suggested that the expected operation pattern of such polygeneration system is taken......Lignocellulosic ethanol production is often assumed integrated in polygeneration systems because of its energy intensive nature. The objective of this study is to investigate potential irreversibilities from such integration, and what impact it has on the efficiency of the integrated ethanol...

  18. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  19. Integrating Organizational Learning and Business Praxis: A Case for Intelligent Project Management.

    Science.gov (United States)

    Cavaleri, Steven A.; Fearon, David S.

    2000-01-01

    Project management provides a natural home for organizational learning, freeing it from mechanical processes. Organizational learning plays a critical role in intelligent project management, which combines manageability, performance outcomes of knowledge management, and innovation. Learning should be integrated into an organization's core…

  20. The Ohio River Valley CO2 Storage Project AEP Mountaineer Plant, West Virginia Numerical Simulation and Risk Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Neeraj Gupta

    2008-03-31

    screening method was also useful in identifying unnecessary items that were not significant given the site-specific geology and proposed scale of the Ohio River Valley CO{sub 2} Storage Project. Overall, the FEP database approach provides a comprehensive methodology for assessing potential risk for a practical CO{sub 2} storage application. An integrated numerical fate and transport model was developed to enable risk and consequence assessment at field scale. Results show that such an integrated modeling effort would be helpful in meeting the project objectives (such as site characterization, engineering, permitting, monitoring and closure) during different stages. A reservoir-scale numerical model was extended further to develop an integrated assessment framework which can address the risk and consequence assessment, monitoring network design and permitting guidance needs. The method was used to simulate sequestration of CO{sub 2} in moderate quantities at the Mountaineer Power Plant. Results indicate that at the relatively low injection volumes planned for pilot scale demonstration at this site, the risks involved are minor to negligible, owing to a thick, low permeability caprock and overburden zones. Such integrated modeling approaches coupled with risk and consequence assessment modeling are valuable to project implementation, permitting, monitoring as well as site closure.

  1. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    Science.gov (United States)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  2. Performance analysis of an integrated gas-, steam- and organic fluid-cycle thermal power plant

    International Nuclear Information System (INIS)

    Oko, C.O.C.; Njoku, I.H.

    2017-01-01

    This paper presents the performance analysis of an existing combined cycle power plant augmented with a waste heat fired organic Rankine cycle power plant for extra power generation. This was achieved by performing energy and exergy analysis of the integrated gas-, steam- and organic fluid-cycle thermal power plant (IPP). Heat source for the subcritical organic Rankine cycle (ORC) was the exhaust flue gases from the heat recovery steam generators of a 650 MW natural gas fired combined cycle power plant. The results showed that extra 12.4 MW of electricity was generated from the attached ORC unit using HFE7100 as working fluid. To select ORC working fluid, ten isentropic fluids were screened and HFE7100 produced the highest net power output and cycle efficiency. Exergy and energy efficiencies of the IPP improved by 1.95% and 1.93%, respectively. The rate of exergy destruction in the existing combined cycle plant was highest in the combustion chamber, 59%, whereas in the ORC, the highest rate of exergy destruction occurred in the evaporator, 62%. Simulations showed exergy efficiency of the IPP decreased with increasing ambient temperature. Exit stack flue gas temperature reduced from 126 °C in the combined cycle power plant to 100 °C in the integrated power plant. - Highlights: • Combined cycle plant retrofitted with ORC produced extra 12.4 MW electric power. • ORC is powered with low temperature flue gas from an existing combined cycle plant. • Exergy destruction rate in integrated plant(IPP) is less than in combined plant. • Exit stack temperature of the IPP has less environmental thermal pollution. • Exergy and energy efficiencies of the IPP improved by 1.95% and 1.93%, respectively.

  3. Plutonium Finishing Plant Transition Project mission analysis report

    International Nuclear Information System (INIS)

    Courson, D.B.

    1994-01-01

    This report defines the mission for the Plutonium Finishing Plant Transition Project (PFPTP) using a systems engineering approach. This mission analysis will be the basis for the functional analysis which will further define and break down the mission statement into all of the detailed functions required to accomplish the mission. The functional analysis is then used to develop requirements, allocate those requirements to functions, and eventually be used to design the system. This report: presents the problem which will be addressed, defines PFP Transition Project, defines the overall mission statement, describes the existing, initial conditions, defines the desired, final conditions, identifies the mission boundaries and external interfaces, identifies the resources required to carry out the mission, describes the uncertainties and risks, and discusses the measures which will be used to determine success

  4. Integrated Project Delivery (IPD Research Trends.

    Directory of Open Access Journals (Sweden)

    Kahvandi, Z.

    2017-07-01

    Full Text Available Integrated Project Delivery (IPD is introduced as a vibrant approach to enhance project implementation, having particular position in recent studies among construction researchers. This study analyzes the research trends on the field of IPD to provide an appropriate vision for future researchers in this specialized field. While so far no comprehensive research has been done in this field, this study provides a comprehensive review of existing studies through in-depth literature review method. This research evaluates studies conducted in the field of IPD, which is a basis for future researchers to improve conditions of IPD implementation in different countries. For that this study Using library studies, the trend of researches conducted on various concepts and domains during various years, has been investigated. Future studies can simply use the outputs of this research to shape their research flow on establishing continuing progress of IPD. The data obtained from descriptive analyses are illustrated quantitatively, followed by comprehensive analyses and discussion of the results. Moreover, this study concluded that during recent years, the trend of studies conducted about IPD has increased, particularly articles examined challenges. In the next step, more studies have been performed in the field of construction. Those articles are preferred that have evaluated principles, challenges, and solutions for resolving barriers. Proper IPD implementation facilitates enhanced share of information and early identification of stakeholders through a proper timing as vital keys to realize objectives of the construction projects, reduce risks, and increase the chance of project success.

  5. Integration, Configuration and Coordination: from Project to Reality, at CERN

    CERN Document Server

    Barberan Marin, Maria; Bernardini, Marzia; Birtwistle, Thomas; Chemli, Samy; Corso, Jean-Pierre; Coupard, Julie; Foraz, Katy; Grillot, Serge; Muttoni, Yvon; Perrot, Anne-Laure

    2016-01-01

    The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.

  6. Development of an integrated facility for processing transuranium solid wastes at the Savannah River Plant

    International Nuclear Information System (INIS)

    Boersma, M.D.; Hootman, H.E.; Permar, P.H.

    1978-01-01

    An integrated facility is being designed for processing solid wastes contaminated with long-lived alpha emitting (TRU) nuclides; this waste has been stored retrievably at the Savannah River Plant since 1965. The stored waste, having a volume of 10 4 m 3 and containing 3x10 5 Ci of transuranics, consists of both mixed combustible trash and failed and obsolete equipment primarily from transuranic production and associated laboratory operations. The facility for processing solid transuranic waste will consist of five processing modules: 1) unpackaging, sorting, and assaying; 2) treatment of combustibles by controlled air incineration; 3) size reduction of noncombustibles by plasma-arc cutting followed by decontamination by electropolishing; 4) fixation of the processed waste in cement; and 5) packaging for shipment to a federal repository. The facility is projected for construction in the mid-1980's. Pilot facilities, sized to manage currently generated wastes, will also demonstrate the key process steps of incineration of combustibles and size reduction/decontamination of noncombustibles; these facilities are projected for 1980-81. Development programs leading to these extensive new facilities are described

  7. Development of an integrated facility for processing TRU solid wastes at the Savannah River Plant

    International Nuclear Information System (INIS)

    Boersma, M.D.; Hootman, H.E.; Permar, P.H.

    1977-01-01

    An integrated facility is being designed for processing solid wastes contaminated with long-lived alpha emitting (TRU) nuclides; this waste has been stored retrievably at the Savannah River Plant since 1965. The stored waste, having a volume of 10 4 m 3 and containing 3 x 10 5 Ci of transuranics, consists of both mixed combustible trash and failed and obsolete equipment primarily from transuranic production and associated laboratory operations. The facility for processing solid transuranic waste will consist of five processing modules: (1) unpackaging, sorting, and assaying; (2) treatment of combustibles by controlled air incineration; (3) size reduction of noncombustibles by plasma-arc cutting followed by decontamination by electropolishing; (4) fixation of the processed waste in cement; and (5) packaging for shipment to a federal repository. The facility is projected for construction in the mid-1980's. Pilot facilities, sized to manage currently generated wastes, will also demonstrate the key process steps of incineration of combustibles and size reduction/decontamination of noncombustibles; these facilities are projected for 1980-81. Development programs leading to these extensive new facilities are described

  8. The reliability of integrated gasification combined cycle (IGCC) power generation units

    Energy Technology Data Exchange (ETDEWEB)

    Higman, C.; DellaVilla, S.; Steele, B. [Syngas Consultants Ltd. (United Kingdom)

    2006-07-01

    This paper presents two interlinked projects aimed at supporting the improvement of integrated gasification combined cycle (IGCC) reliability. The one project comprises the extension of SPS's existing ORAP (Operational Reliability Analysis Program) reliability, availability and maintainability (RAM) tracking technology from its existing base in natural gas open and combined cycle operations into IGCC. The other project is using the extended ORAP database to evaluate performance data from existing plants. The initial work has concentrated on evaluating public domain data on the performance of gasification based power and chemical plants. This is being followed up by plant interviews in some 20 plants to verify and expand the database on current performance. 23 refs., 8 figs., 2 tabs.

  9. Project quality management under EPC mode by the owner of nuclear power plant

    International Nuclear Information System (INIS)

    Xu Hui; Hu Miao

    2014-01-01

    As the first completely independent nuclear power project in China, Fangjiashan nuclear power project is constructed under EPC mode of general project contracting. This paper, taking the project as an example, aims to explore how the project owners carry out quality management for the installation project during the construction of the nuclear power plant based on EPC mode. It has certain reference value for the management of following nuclear power projects which adopting the EPC construction mode. It will play a positive role in improving China's overall self-management abilities in the nuclear power construction, and lay a solid foundation for follow-up nuclear power construction in China. (authors)

  10. Progress Report 15, December 1979-April 1980, and proceedings of the fifteenth Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is reported. Reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering; and operations are included. Also, a report on, and copies of visual presentations made at, the Project Integration Meeting held April 2 and 3, 1980, are included.

  11. Evolution of plant virus movement proteins from the 30K superfamily and of their homologs integrated in plant genomes

    Energy Technology Data Exchange (ETDEWEB)

    Mushegian, Arcady R., E-mail: mushegian2@gmail.com [Division of Molecular and Cellular Biosciences, National Science Foundation, 4201 Wilson Boulevard, Arlington, VA 22230 (United States); Elena, Santiago F., E-mail: sfelena@ibmcp.upv.es [Instituto de Biología Molecular y Celular de Plantas, CSIC-UPV, 46022 València (Spain); The Santa Fe Institute, Santa Fe, NM 87501 (United States)

    2015-02-15

    Homologs of Tobacco mosaic virus 30K cell-to-cell movement protein are encoded by diverse plant viruses. Mechanisms of action and evolutionary origins of these proteins remain obscure. We expand the picture of conservation and evolution of the 30K proteins, producing sequence alignment of the 30K superfamily with the broadest phylogenetic coverage thus far and illuminating structural features of the core all-beta fold of these proteins. Integrated copies of pararetrovirus 30K movement genes are prevalent in euphyllophytes, with at least one copy intact in nearly every examined species, and mRNAs detected for most of them. Sequence analysis suggests repeated integrations, pseudogenizations, and positive selection in those provirus genes. An unannotated 30K-superfamily gene in Arabidopsis thaliana genome is likely expressed as a fusion with the At1g37113 transcript. This molecular background of endopararetrovirus gene products in plants may change our view of virus infection and pathogenesis, and perhaps of cellular homeostasis in the hosts. - Highlights: • Sequence region shared by plant virus “30K” movement proteins has an all-beta fold. • Most euphyllophyte genomes contain integrated copies of pararetroviruses. • These integrated virus genomes often include intact movement protein genes. • Molecular evidence suggests that these “30K” genes may be selected for function.

  12. Electric Vehicle Fleet Integration in the Danish EDISON Project

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Træholt, Chresten; Marra, Francesco

    2010-01-01

    The Danish EDISON project has been launched to investigate how a large fleet of electric vehicles (EVs) can be integrated in a way that supports the electric grid while benefitting both the individual car owners and society as a whole through reductions in CO2 emissions. The consortium partners...

  13. European Europart integrated project on actinide partitioning

    International Nuclear Information System (INIS)

    Madic, C.; Hudson, M.J.

    2005-01-01

    This poster presents the objectives of EUROPART, a scientific integrated project between 24 European partners, mostly funded by the European Community within the FP6. EUROPART aims at developing chemical partitioning processes for the so-called minor actinides (MA) contained in nuclear wastes, i.e. from Am to Cf. In the case of dedicated spent fuels or targets, the actinides to be separated also include U, Pu and Np. The techniques considered for the separation of these radionuclides belong to the fields of hydrometallurgy and pyrometallurgy, as in the previous FP5 programs named PARTNEW and PYROREP. The two main axes of research within EUROPART will be: The partitioning of MA (from Am to Cf) from high burn-up UO x fuels and multi-recycled MOx fuels; the partitioning of the whole actinide family for recycling, as an option for advanced dedicated fuel cycles (and in connection with the studies to be performed in the EUROTRANS integrated project). In hydrometallurgy, the research is organised into five Work Packages (WP). Four WP are dedicated to the study of partitioning methods mainly based on the use of solvent extraction methods, one WP is dedicated to the development of actinide co-conversion methods for fuel or target preparation. The research in pyrometallurgy is organized into four WP, listed hereafter: development of actinide partitioning methods, study of the basic chemistry of trans-curium elements in molten salts, study of the conditioning of the wastes, some system studies. Moreover, a strong management team will be concerned not only with the technical and financial issues arising from EUROPART, but also with information, communication and benefits for Europe. Training and education of young researchers will also pertain to the project. EUROPART has also established collaboration with US DOE and Japanese CRIEPI. (authors)

  14. The Human Genome Project: big science transforms biology and medicine.

    Science.gov (United States)

    Hood, Leroy; Rowen, Lee

    2013-01-01

    The Human Genome Project has transformed biology through its integrated big science approach to deciphering a reference human genome sequence along with the complete sequences of key model organisms. The project exemplifies the power, necessity and success of large, integrated, cross-disciplinary efforts - so-called 'big science' - directed towards complex major objectives. In this article, we discuss the ways in which this ambitious endeavor led to the development of novel technologies and analytical tools, and how it brought the expertise of engineers, computer scientists and mathematicians together with biologists. It established an open approach to data sharing and open-source software, thereby making the data resulting from the project accessible to all. The genome sequences of microbes, plants and animals have revolutionized many fields of science, including microbiology, virology, infectious disease and plant biology. Moreover, deeper knowledge of human sequence variation has begun to alter the practice of medicine. The Human Genome Project has inspired subsequent large-scale data acquisition initiatives such as the International HapMap Project, 1000 Genomes, and The Cancer Genome Atlas, as well as the recently announced Human Brain Project and the emerging Human Proteome Project.

  15. 77 FR 59166 - South Mississippi Electric Cooperative: Plant Ratcliffe, Kemper County Integrated Gasification...

    Science.gov (United States)

    2012-09-26

    ... SMEPA lacks sufficient control and responsibility over the Project, RUS determined that financing SMEPA... Ratcliffe, Kemper County Integrated Gasification Combined-Cycle (IGCC) Project AGENCY: Rural Utilities..., Mississippi (the Project). The Acting Administrator of RUS has signed the ROD, which is effective on the...

  16. Quality management in an international nuclear power plant project

    International Nuclear Information System (INIS)

    Brion, J.; Crustin, J.

    1975-01-01

    SNR (Schneller Natriumgekuehlter Reaktor) is the fast reactor power plant being erected at Kalkar, Federal German Republic. Quality management in this project is a contractual obligation. Quality management is subdivided into quality engineering, set of actions performed before manufacturing, and quality control, set of material controls performed during fabrication. The two successive phases of the quality management are presented. The difficulties and improvment possibilities are discussed [fr

  17. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  18. Stakeholder integration and public engagement of EU and national research projects in Germany

    Science.gov (United States)

    Ruhnau, Meike; Guo, Chenbo; Walter, Anastasia; Schneider, Nadine

    2017-04-01

    The talk addresses the feasibility and difficulties of research projects to reach out and to integrate a sufficient number of stakeholders (vgl. Carrada, 2006; Poulsen, 2007; Zikos et al. 2012; Lee & Belohlav, 2014). With "stakeholders" we understand end-users, policy makers, students for capacity building, administrators and interested general public. The design and later the implementation of stakeholder integration and public engagement strongly depend on the priority-setting and requirements of funding agencies (EU [1], DFG, BMBF and the regional ministries in Germany). They affect the size and constellation of consortia as well as the longevity and continuity of research community; on the other hand they also determine the weighting of communication, dissemination, outreach (and networking) activities within the project. For instance by public engagement of EU funded projects a share of 10% for communication and outreach activities was rated as best practices in 2014 [2]. On the national level there is no such appointment so far. In our talk we will quantify and compare activities among selected EU and nationally funded collaborative projects in Germany, address the hurdles, investigate the communication tools, examine the outreach channels and dissemination tactics, reflect the performances and the results achieved so far, with the objective to answer the following questions: - What tools/channels have been applied so far? Were they efficient and expedient? - What can be count as best practices? - Are such activities sustainable at all? The goal of this talk is to show the complexity of the stakeholder integration and public engagement in research projects, to critically assess our experiences gained in past and running projects, and to subsequently have an interactive exchange with other project professionals at EGU. [1] European Commission (2004, 2008, 2010, 2014). Communicating EU research and innovation guidance for project participants; [2] European

  19. Toshiba integrated information system for design of nuclear power plants

    International Nuclear Information System (INIS)

    Abe, Yoko; Kawamura, Hirobumi; Sasaki, Norio; Takasaka, Kiyoshi

    1993-01-01

    TOSHIBA aims to secure safety, increase reliability and improve efficiency through the engineering for nuclear power plants and has been introducing Computer Aided Engineering (CAE). Up to the present, TOSHIBA has been developing computer systems which support each field of design and applying them to the design of nuclear power plants. The new design support system has been developed to integrate each of those systems in order to realize much greater improvement in accuracy and increase of reliability in design using state-of-the-art computer technology

  20. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland

  1. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-14

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.

  2. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  3. Project plan for the background soils project for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Background Soils Project for the Paducah Gaseous Diffusion Plant (BSPP) will determine the background concentration levels of selected naturally occurring metals, other inorganics, and radionuclides in soils from uncontaminated areas in proximity to the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The data will be used for comparison with characterization and compliance data for soils, with significant differences being indicative of contamination. All data collected as part of this project will be in addition to other background databases established for the PGDP. The BSPP will address the variability of surface and near-surface concentration levels with respect to (1) soil taxonomical types (series) and (2) soil sampling depths within a specific soil profile. The BSPP will also address the variability of concentration levels in deeper geologic formations by collecting samples of geologic materials. The BSPP will establish a database, with recommendations on how to use the data for contaminated site assessment, and provide data to estimate the potential human and health and ecological risk associated with background level concentrations of potentially hazardous constituents. BSPP data will be used or applied as follows.

  4. Project plan for the background soils project for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    International Nuclear Information System (INIS)

    1995-09-01

    The Background Soils Project for the Paducah Gaseous Diffusion Plant (BSPP) will determine the background concentration levels of selected naturally occurring metals, other inorganics, and radionuclides in soils from uncontaminated areas in proximity to the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The data will be used for comparison with characterization and compliance data for soils, with significant differences being indicative of contamination. All data collected as part of this project will be in addition to other background databases established for the PGDP. The BSPP will address the variability of surface and near-surface concentration levels with respect to (1) soil taxonomical types (series) and (2) soil sampling depths within a specific soil profile. The BSPP will also address the variability of concentration levels in deeper geologic formations by collecting samples of geologic materials. The BSPP will establish a database, with recommendations on how to use the data for contaminated site assessment, and provide data to estimate the potential human and health and ecological risk associated with background level concentrations of potentially hazardous constituents. BSPP data will be used or applied as follows

  5. An extension of the plant ontology project supporting wood anatomy and development research

    Science.gov (United States)

    Federic Lens; Laurel Cooper; Maria Alejandra Gandolfo; Andrew Groover; Pankaj Jaiswal; Barbara Lachenbruch; Rachel Spicer; Margaret E. Staton; Dennis W. Stevenson; Ramona L. Walls; Jill. Wegrzyn

    2012-01-01

    A wealth of information on plant anatomy and morphology is available in the current and historical literature, and molecular biologists are producing massive amounts of transcriptome and genome data that can be used to gain better insights into the development, evolution, ecology, and physiological function of plant anatomical attributes. Integrating anatomical and...

  6. The importance of flexible power plant operation for Jiangsu's wind integration

    DEFF Research Database (Denmark)

    Hong, Lixuan; Lund, Henrik; Möller, Bernd

    2012-01-01

    This paper presents the influence of different regulation strategies on wind energy integration into the existing energy system of Jiangsu. The ability of wind integration is defined in terms of the ability to avoid excess electricity production, to conserve primary energy consumption and to redu...... regulations of Jiangsu’s energy system are compared and analyzed in the range of a wind input from 0% to 42% of the total electricity demand. It is concluded that operating power plants in a flexible way facilitates the promotion of more intermittent wind integration....

  7. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  8. RIBA Project - Risk-Informed approach for In-Service Inspection of Nuclear Power Plant Components. Project summary

    International Nuclear Information System (INIS)

    Lidbury, D.; Smith, G.

    2001-12-01

    The need for a European review of a Risk-Informed Approach for In-Service Inspection of Nuclear Power Plant Components (RIBA) was identified in 1998. This was as a priority item in the programme of activities conducted in the framework of the Council Resolutions of 22 July 1975 and of 18 June 1992 on the Technological Problems of Nuclear Safety. The RIBA Project was established in November 1999 as a 24-month Study Contract funded by the European Commission within the frame of the former DG XI WGCS (Working Group on Codes and Standards). The Study Contract was subsequently managed for the EC by DG TREN. The participants in RIBA were Serco Assurance (project coordinator), Ringhals AB, EDF, Tecnatom SA and Westinghouse Electric Europe. The work is presented in a summary report with the detailed results contained in three companion reports as follows: main conclusions and recommendations, Review of Existing Risk-Informed Methodologies, A Comparative Study of Risk-Informed In-Service Inspection Applications, Conclusions and Recommendations for Risk-Informed in-service inspection methodology applied to Nuclear Power Plants in Europe. (author)

  9. Completion of Belene Nuclear Power Plant: Project perspectives

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2006-01-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  10. Completion of Belene Nuclear Power Plant: Project perspectives

    Energy Technology Data Exchange (ETDEWEB)

    Bogdanov, D. [Risk Engineering Ltd., CREFID, 34 Totleben Blvd., Sofia 1606 (Bulgaria)]. E-mail: bogdanov@riskeng.bg

    2006-07-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  11. National project : advanced robot for nuclear power plant

    International Nuclear Information System (INIS)

    Tsunemi, T.; Takehara, K.; Hayashi, T.; Okano, H.; Sugiyama, S.

    1993-01-01

    The national project 'Advanced Robot' has been promoted by the Agency of Industrial science and Technology, MITI for eight years since 1983. The robot for a nuclear plant is one of the projects, and is a prototype intelligent one that also has a three dimensional vision system to generate an environmental model, a quadrupedal walking mechanism to work on stairs and four fingered manipulators to disassemble a valve with a hand tool. Many basic technologies such as an actuator, a tactile sensor, autonomous control and so on progress to high level. The prototype robot succeeded functionally in official demonstration in 1990. More refining such as downsizing and higher intelligence is necessary to realize a commercial robot, while basic technologies are useful to improve conventional robots and systems. This paper presents application studies on the advanced robot technologies. (author)

  12. Pinon Pine IGCC project status

    International Nuclear Information System (INIS)

    Higginbotham, E.B.; Lamarre, L.J.; Glazer, M.

    1993-01-01

    Sierra Pacific Power Company (SPPCo) intends to build the Pinon Pine Power Project, an integrated coal gasification combined cycle (IGCC) plant at its Tracy Power Station near Reno, Nevada. The plant will burn approximately 800 tons of coal per day to generate electricity in a base load application. The Pinon Project was selected by the U.S. Department of Energy (DOE) for funding under Round IV of the Clean Coal Technology Program. The project will demonstrate the use of the KRW agglomerating fluidized bed gasifer operating in the air blown mode. Hot gas cleanup consisting of particulate and sulfur removal will also be demonstrated. The Cooperative Agreement between SPPCo and the DOE was executed in August 1992. Foster Wheeler USA Corporation (FWUSA) will provide engineering and construction management services. The M.W. Kellogg Company (MWK) will provide engineering of the gasifer and hot gas cleanup systems. A discussion of project progress since the 1992 Clean Coal Technology Conference, design and economic considerations, and current project status is presented

  13. The SeaView EarthCube project: Lessons Learned from Integrating Across Repositories

    Science.gov (United States)

    Diggs, S. C.; Stocks, K. I.; Arko, R. A.; Kinkade, D.; Shepherd, A.; Olson, C. J.; Pham, A.

    2017-12-01

    SeaView is an NSF-funded EarthCube Integrative Activity Project working with 5 existing data repositories* to provide oceanographers with highly integrated thematic data collections in user-requested formats. The project has three complementary goals: Supporting Scientists: SeaView targets scientists' need for easy access to data of interest that are ready to import into their preferred tool. Strengthening Repositories: By integrating data from multiple repositories for science use, SeaView is helping the ocean data repositories align their data and processes and make ocean data more accessible and easily integrated. Informing EarthCube (earthcube.org): SeaView's experience as an integration demonstration can inform the larger NSF EarthCube architecture and design effort. The challenges faced in this small-scale effort are informative to geosciences cyberinfrastructure more generally. Here we focus on the lessons learned that may inform other data facilities and integrative architecture projects. (The SeaView data collections will be presented at the Ocean Sciences 2018 meeting.) One example is the importance of shared semantics, with persistent identifiers, for key integration elements across the data sets (e.g. cruise, parameter, and project/program.) These must allow for revision through time and should have an agreed authority or process for resolving conflicts: aligning identifiers and correcting errors were time consuming and often required both deep domain knowledge and "back end" knowledge of the data facilities. Another example is the need for robust provenance, and tools that support automated or semi-automated data transform pipelines that capture provenance. Multiple copies and versions of data are now flowing into repositories, and onward to long-term archives such as NOAA NCEI and umbrella portals such as DataONE. Exact copies can be identified with hashes (for those that have the skills), but it can be painfully difficult to understand the processing

  14. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    Energy Technology Data Exchange (ETDEWEB)

    Doug Strickland; Albert Tsang

    2002-10-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over a three year period, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial plants operated at Dow Chemical or Dow Corning chemical plant locations; (2) Research, development, and testing to define any technology gaps or critical design and integration issues; and (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana. This report describes management planning, work breakdown structure development, and feasibility study activities by the IMPPCCT consortium in support of the first project phase. Project planning activities have been completed, and a project timeline and task list has been generated. Requirements for an economic model to evaluate the West Terre Haute implementation and for other commercial implementations are being defined. Specifications for methanol product and availability of local feedstocks for potential commercial embodiment plant sites have been defined. The WREL facility is a project selected and co-funded under the fifth phase solicitation of the U.S. Department of Energy's Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis

  15. Integrated control and diagnostic system architectures for future installations

    International Nuclear Information System (INIS)

    Wood, R.; March-Leuba, J.

    2000-01-01

    Nuclear reactors of the 21st century will employ increasing levels of automation and fault tolerance to increase availability, reduce accident risk, and lower operating costs. Key developments in control algorithms, fault diagnostics, fault tolerance, and distributed communications are needed to implement the fully automated plant. It will be equally challenging to integrate developments in separate information and control fields into a cohesive system, which collectively achieves the overall goals of improved safety, reliability, maintainability, and cost-effectiveness. Under the Nuclear Energy Research Initiative (NERI), the US Department of Energy is sponsoring a project to address some of the technical issues involved in meeting the long-range goal of 21st century reactor control systems. This project involves researchers from Oak Ridge National Laboratory, the University of Tennessee, and North Carolina State University. The research tasks under this project focus on some of the first-level breakthroughs in control design, diagnostic techniques, and information system design that will provide a path to enable the design process to be automated in the future. This paper describes the conceptual development of an integrated nuclear plant control and information system architecture, which incorporates automated control system development that can be traced to a set of technical requirements. The expectation is that an integrated plant architecture with optimal control and efficient use of diagnostic information can reduce the potential for operational errors and minimize challenges to the plant safety systems

  16. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  17. Power up your plant - An introduction to integrated process and power automation

    Energy Technology Data Exchange (ETDEWEB)

    Vasel, Jeffrey

    2010-09-15

    This paper discusses how a single integrated system can increase energy efficiency, improve plant uptime, and lower life cycle costs. Integrated Process and Power Automation is a new system integration architecture and power strategy that addresses the needs of the process and power generation industries. The architecture is based on Industrial Ethernet standards such as IEC 61850 and Profinet as well as Fieldbus technologies. The energy efficiency gains from integration are discussed in a power generation use case. A power management system success story from a major oil and gas company, Petrobras, is also discussed.

  18. Economic analysis of a supercritical coal-fired CHP plant integrated with an absorption carbon capture installation

    International Nuclear Information System (INIS)

    Bartela, Łukasz; Skorek-Osikowska, Anna; Kotowicz, Janusz

    2014-01-01

    Energy investments in Poland are currently focused on supercritical coal-fired unit technology. It is likely, that in the future, these units are to be integrated with carbon capture and storage (CCS) installations, which enable a significant reduction of greenhouse gas emissions into the atmosphere. A significant share of the energy market in Poland is constituted by coal-fired combined heat and power (CHP) plants. The integration of these units with CCS installation can be economically inefficient. However, the lack of such integration enhances the investment risk due to the possibility of appearing on the market in the near future high prices of emission allowances. The aforementioned factors and additional favorable conditions for the development of cogeneration can cause one to consider investing in large supercritical CHP plants. This paper presents the results of an economic analysis aimed at comparing three cases of CHP plants, one without an integrated CCS installation and two with such installations. The same steam cycle structure for all variants was adopted. The cases of integrated CHP plants differ from each other in the manner in which they recover heat. For the evaluation of the respective solutions, the break-even price of electricity and avoided emission cost were used. - Highlights: • The simulations of operation of CHP plants under changing load have been realized. • For analyzed cases sensitivity analyses of economic indices have been conducted. • Conditions of competitiveness for integration with CCS units have been identified. • Integration can be profitable if prices of allowance will reach high values, exceeding 50 €/MgCO 2 . • Others important factors are the investment costs and operation and maintenance costs

  19. Techno-Economic Analysis of Integration of Low-Temperature Geothermal Resources for Coal-Fired Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Bearden, Mark D.; Davidson, Casie L.; Horner, Jacob A.; Heldebrant, David J.; Freeman, Charles J.

    2016-05-11

    Presented here are the results of a techno-economic (TEA) study of the potential for coupling low-grade geothermal resources to boost the electrical output from coal-fired power plants. This study includes identification of candidate 500 MW subcritical coal-fired power plants in the continental United States, followed by down-selection and characterization of the North Valmy generating station, a Nevada coal-fired plant. Based on site and plant characteristics, ASPEN Plus models were designed to evaluate options to integrate geothermal resources directly into existing processes at North Valmy. Energy outputs and capital costing are presented for numerous hybrid strategies, including integration with Organic Rankine Cycles (ORCs), which currently represent the primary technology for baseload geothermal power generation.

  20. Bio-oil fueled diesel power plant; Biooeljyllae toimiva dieselvoimala

    Energy Technology Data Exchange (ETDEWEB)

    Vuorinen, A. [Modigen Oy, Helsinki (Finland)

    1995-12-31

    The project mission is to develop a diesel power plant which is capable of using liquid bio-oils as the main fuel of the power plant. The applicable bio-oils are rape seed oils and pyrolysis oils. The project was started in 1994 by installing a 1.5 MW Vasa 4L32 engine in VTT Energy laboratory in Otaniemi. During 1995 the first tests with the rape seed oils were made. The tests show that the rape seed oil can be used in Vasa 32 engines without difficulties. In the second phase of the project during 1996 and 1997 pyrolysis oil made of wood will be tested. Finally a diesel power plant concept with integrated pyrolysis oil, electricity and heat production will be developed