  1. TMI-2 fuel-recovery plant. Feasibility study

    International Nuclear Information System (INIS)

    Evans, D.L.

    1982-12-01

    This project is a feasibility study for constructing a TMI-2 core Fuel Recovery Plant at the Idaho National Engineering Laboratory (INEL). The primary objectives of the Fuel Recovery Plant (FRP) are to recover and account for the fuel and to process, isolate, and package the waste material from the TMI-2 core. This feasibility study is predicated on a baseline plant and covers its design, fabrication, installation, testing and operation. Alternative methods for the disposal of the TMI-2 core have also been considered, but not examined in detail for their feasibility. The FRP will receive TMI-2 fuel in canisters. The fuel will vary from core debris to intact fuel assemblies and include some core structural materials. The canister contents will be shredded and subsequently fed to a dissolver. Uranium, plutonium, fission products, and some core structural material will be dissolved. The uranium will be separated by solvent extraction and solidified by calcination. The plutonium will also be separated by solvent extraction and routed to the Plutonium Extraction Facility. The wastes will be packaged for further treatment, temporary storage or permanent disposal

  2. Feasibility study of component risk ranking for plant maintenance

    International Nuclear Information System (INIS)

    Ushijima, Koji; Yonebayashi, Kenji; Narumiya, Yoshiyuki; Sakata, Kaoru; Kumano, Tetsuji

    1999-01-01

    Nuclear power is the base load electricity source in Japan, and reduction of operation and maintenance cost maintaining or improving plant safety is one of the major issues. Recently, Risk Informed Management (RIM) is focused as a solution. In this paper, the outline regarding feasibility study of component risk ranking for plant maintenance for a typical Japanese PWR plant is described. A feasibility study of component risk raking for plant maintenance optimization is performed on check valves and motor-operated valves. Risk ranking is performed in two steps using probabilistic analysis (quantitative method) for risk ranking of components, and deterministic examination (qualitative method) for component review. In this study, plant components are ranked from the viewpoint of plant safety / reliability, and the applicability for maintenance is assessed. As a result, distribution of maintenance resources using risk ranking is considered effective. (author)

  3. Pinellas Plant feasibility study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Pinellas Plant was built in 1956 to manufacture neutron generators, a principal component in nuclear weapons. In September 1990, the Department of Health and Rehabilitative Services (HRS) entered into an agreement with DOE to independently examine environmental monitoring data from the plant and health data from Pinellas County to determine if an epidemiological study is technically feasible to measure possible off-site health effects from ionizing radiation. Through normal plant operations, some radioactive materials have been released to the environment. Eighty percent of the total plant releases of 107,707 curies occurred in the early years of plant operation (1957--1960). The primary materials released were tritium gas, tritium oxide and krypton-85. Environmental monitoring for radioactive releases from the plant has been done regularly since 1975. The US Public Health Service Centers for Disease Control and Prevention (CDC), in assisting HRS, has determined that sufficient radiological data exist by which a dose reconstruction can be done. A dose reconstruction can provide an estimate of how much radiological exposure someone living in the vicinity of the Pinellas Plant may have suffered from environmental releases.

  4. Pinellas Plant feasibility study. Final report

    International Nuclear Information System (INIS)

    1994-09-01

    The Pinellas Plant was built in 1956 to manufacture neutron generators, a principal component in nuclear weapons. In September 1990, the Department of Health and Rehabilitative Services (HRS) entered into an agreement with DOE to independently examine environmental monitoring data from the plant and health data from Pinellas County to determine if an epidemiological study is technically feasible to measure possible off-site health effects from ionizing radiation. Through normal plant operations, some radioactive materials have been released to the environment. Eighty percent of the total plant releases of 107,707 curies occurred in the early years of plant operation (1957--1960). The primary materials released were tritium gas, tritium oxide and krypton-85. Environmental monitoring for radioactive releases from the plant has been done regularly since 1975. The US Public Health Service Centers for Disease Control and Prevention (CDC), in assisting HRS, has determined that sufficient radiological data exist by which a dose reconstruction can be done. A dose reconstruction can provide an estimate of how much radiological exposure someone living in the vicinity of the Pinellas Plant may have suffered from environmental releases

  5. [Feasibility study for whole plant medicinal use of Tribulus terrestris].

    Science.gov (United States)

    Yang, Li; Wang, Chunyu; Han, Meiw; Yang, Limin

    2009-09-01

    The content differences of leaf, plant and fruit of Tribulus terrestris was compared to study the feasibility of whole plant medicinal use. The samples were collected in three typical habitats and six different production areas of T. terrestris. The main medicinal ingredients saponins and flavonoids were determined in root, stem, leaf and fruit during the harvest time. The two ingredients were abounded in leaf and more than 2.61 times as in other parts of the plant. The results showed that there were no differences between the whole plant and the fruit. It should pay more attentions on the collection, preservation and utilization of the leaf of T. terrestris in the harvesting and processing stage. The whole plant for medical use was feasibility based on the content of the ingredients.

  6. Engineering management at feasibility study stage of nuclear power plant under EPC mode

    International Nuclear Information System (INIS)

    Wang Zhiqiang

    2015-01-01

    After the investment reform by the State Council in 2004, NDRC carries out approval system for enterprises to invest in nuclear power plants. Feasibility study stage is a critical stage on the mainline of nuclear power project approval, which intersects with the license application, and engineering design. The owners of nuclear power plants are required stringently in engineering management. From the owners' management point of view under EPC mode, this paper sorts the preliminary project process for nuclear power plants, focusing on the management in the feasibility study stage. License application and engineering design management in the feasibility study stage are also discussed. (author)

  7. Feasibility study on Ashuganj NGL Fractionation Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A feasibility study has been performed on Ashuganj NGL Fractionation Plant being planned in the People's Republic of Bangladesh. The present study has discussed a plant to manufacture liquefied oil gas, automotive fuel, and diesel fuel from liquefied natural gas. The plan calls for the plant life of 20 years, liquefied natural gas as the raw material to be supplied continuously and stably from the gas reservoir areas via the existing pipelines, the storage tank to have a size of 10-day production, and the product to be transported by barges on Meghna River. As a result of the discussions, the liquefied oil gas produced annually will correspond to crude oil of 44,690 tons, and to 858,048 tons of crude oil cumulatively for 20 years of the plant life. This is an energy derived from unutilized natural gas, which is creation of a new energy. With regard to the reduction of global warming gas emission, it was revealed that a reduction effect of 16,540,000 t-CO2 can be obtained in twenty years, if comparison is made based on combustion of firewood. (NEDO)

  8. Feasibility study on Ashuganj NGL Fractionation Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A feasibility study has been performed on Ashuganj NGL Fractionation Plant being planned in the People's Republic of Bangladesh. The present study has discussed a plant to manufacture liquefied oil gas, automotive fuel, and diesel fuel from liquefied natural gas. The plan calls for the plant life of 20 years, liquefied natural gas as the raw material to be supplied continuously and stably from the gas reservoir areas via the existing pipelines, the storage tank to have a size of 10-day production, and the product to be transported by barges on Meghna River. As a result of the discussions, the liquefied oil gas produced annually will correspond to crude oil of 44,690 tons, and to 858,048 tons of crude oil cumulatively for 20 years of the plant life. This is an energy derived from unutilized natural gas, which is creation of a new energy. With regard to the reduction of global warming gas emission, it was revealed that a reduction effect of 16,540,000 t-CO2 can be obtained in twenty years, if comparison is made based on combustion of firewood. (NEDO)

  9. Feasibility design study. Land-based OTEC plants. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Brewer, J. H.; Minor, J.; Jacobs, R.

    1979-01-01

    The purpose of this study has been to determine the feasibility of installing 10 MWe (MegaWatt-electric) and 40 MWe land-based OTEC demonstration power plants at two specific sites: Keahole Point on the western shore of the island of Hawaii; and Punta Tuna, on the southeast coast of the main island of Puerto Rico. In addition, the study has included development of design parameters, schedules and budgets for the design, construction and operation of these plants. Seawater systems (intake and discharge pipes) were to be sized so that flow losses were equivalent to those expected with a platform-based OTEC power plant. The power module (components and general arrangement was established based on the TRW design. Results are presented in detail. (WHK)

  10. Planning study and economic feasibility for extended life operation of light water reactor plants

    International Nuclear Information System (INIS)

    Negin, C.A.; Goudarzi, L.A.; Kenworthy, L.U.; Lapides, M.E.

    1980-01-01

    The purpose of this planning study was to perform an assessment of the engineering and economic feasibility of extended life operation of present nuclear power plant units and to recommend future programs that may be warranted by the feasibility assessments. This effort concludes, essentially, that there is sufficient economic motivation for refurbishment to warrant more extensive examination for present plants and to identify possible design modifications that would facilitate extended service life in future plants. The costs of replacing the deterioration-prone equipment in a nuclear power plant appear to represent a small portion of the total plant costs, provided downtime is not excessive. A refurbishment and economic analysis is presented

  11. Feasibility study for adapting ITREC plant to reprocessing LMFBR fuels

    International Nuclear Information System (INIS)

    Moccia, A.; Rolandi, G.

    1976-05-01

    The report evaluates the feasibility of adapting ITREC plant to the reprocessing LMFBR fuels, with the double purpose of: 1) recovering valuable Pu contained in these fuels and recycling it to the fabrication plant; 2) trying, on a pilot scale, the chemical process technology to be applied in a future industrial plant for reprocessing the fuel elements discharged from fast breeder power reactors

  12. Feasibility study of a biomass-fired cogeneration plant Groningen, Netherlands

    International Nuclear Information System (INIS)

    Rijk, P.J.; Van Loo, S.; Webb, R.

    1996-06-01

    The feasibility of the title plant is determined for district heating and electricity supply of more than 1,000 houses in Groningen, Netherlands. Also attention is paid to the feasibility of such installations in a planned area of the city. Prices and supply of several biomass resources are dealt with: prunings of parks, public and private gardens, clean wood wastes, wood wastes from forests, wood from newly planted forests, specific energy crops (willows in high densities and short cycles). Prices are calculated, including transport to the gate of the premises where the cogeneration installations is situated. For the conversion attention is paid to both the feasibility of the use of a conventional cogeneration installation (by means of a steam turbine) and the use of a new conversion technique: combined cycle of a gasification installation and a cogeneration installation. 5 figs., 5 ills., 22 tabs., 1 appendix, 33 refs

  13. Feasibility study of microalgal and jatropha biodiesel production plants: Exergy analysis approach

    International Nuclear Information System (INIS)

    Ofori-Boateng, Cynthia; Keat, Teong Lee; JitKang, Lim

    2012-01-01

    The exergy analyses performed in this study are based on three thermodynamic performance parameters namely exergy destruction, exergy efficiency and thermodynamic improvement potentials. After mathematical analysis with Aspen Plus software, the results showed that 64% and 44% of the total exergy content of the input resources into microalgal methyl ester (MME) and jatropha methyl ester (JME) production plants were destroyed respectively for 1 ton of biodiesel produced. This implies that only 36% and 56% (for MME and JME production plants respectively) useful energy in the products is available to do work. The highest and lowest exergy destructions were recorded in the oil extraction units (38% and 39% of the total exergy destroyed for MME and JME plants respectively) and transesterification units (5% and 2% of total exergy destroyed for MME and JME plants respectively) respectively for 1 ton biodiesel produced. Since sustainable biodiesel production depends on cultivation of feedstock, oil extraction and transesterification processes, exergy analysis which is carried out on only the transesterification unit cannot justify the thermodynamic feasibility of the whole biodiesel production plant unless a complete thermodynamic assessment has been done for the whole plant. Thus, according to this study which considers all the biodiesel production processes, MME and JME production plants are not thermodynamically feasible. - Highlights: ► 64% of exergy content of input resources into MME production plant is destroyed. ► 44% of exergy content of input resources into JME production plant is destroyed. ► Exergetic efficiencies of MME and JME production plants are far less than 1. ► Thermodynamically, MME and JME production plants are unsustainable. ► Exergy loss can be reduced by using heat integrated reactive distillation process.

  14. In-plant reliability data base for nuclear plant components: a feasibility study on human error information

    International Nuclear Information System (INIS)

    Borkowski, R.J.; Fragola, J.R.; Schurman, D.L.; Johnson, J.W.

    1984-03-01

    This report documents the procedure and final results of a feasibility study which examined the usefulness of nuclear plant maintenance work requests in the IPRDS as tools for understanding human error and its influence on component failure and repair. Developed in this study were (1) a set of criteria for judging the quality of a plant maintenance record set for studying human error; (2) a scheme for identifying human errors in the maintenance records; and (3) two taxonomies (engineering-based and psychology-based) for categorizing and coding human error-related events

  15. Virtual power plant feasibility study and funding proposal / the virtual power plant objectives, concept, components, context, business plan / objectives, activities and timelines for the VPP feasibility study

    International Nuclear Information System (INIS)

    MacDonald, A.

    2004-01-01

    This paper presents a proposal for funding a virtual power plant feasibility study. The goals of the virtual power plant are to increase the efficiency of electricity use by creating a market-driven, subsidy-free, financially sustainable mechanism to finance economic Demand Side Management (DSM) by providing a fully liquid market for saved electricity, provide a new revenue opportunity for the Local Distributing Company (LDC) and increase the use of renewable and low environmental impact, high efficiency technologies within the service area

  16. Feasibility study of hybrid retrofits to an isolated off-grid diesel power plant

    International Nuclear Information System (INIS)

    Rehman, S.; Ahmad, F.; Shaahid, S.M.; Shash, A.; El-Amin, I.M.; Al-Shehri, A.M.; Bakhashwain, J.M.

    2007-01-01

    The green sources of energy are being encouraged to reduce the environmental pollution and combat the global warming of the planet. A target of 12% usage of wind energy only has been agreed by the UNO country members to achieve by 2020. So, the power of the wind is being used to generate electricity both as grid connected and isolated wind-diesel hybrid power plants. This paper performed a pre-feasibility of wind penetration into an existing diesel plant of a village in north eastern part of Saudi Arabia. For simulation purpose, wind speed data from a near by airport and the load data from the village have been used. The hybrid system design tool HOMER has been used to perform the feasibility study. In the present scenario, for wind speed less than 6.0m/s the, the existing diesel power plant is the only feasible solution over the range of fuel prices used in the simulation. The wind diesel hybrid system becomes feasible at a wind speed of 6.0m/s or more and a fuel price of 0.1$/L or more. If the carbon tax is taken into consideration and subsidy is abolished then it is expected that the hybrid system become feasible. The maximum annual capacity shortage did not have any effect on the cost of energy which may be accounted for larger sizes of wind machines and diesel generators. It is recommended that the wind data must be collected at the village at three different heights using a wind mast of 40m for a minimum of one complete year and then the hybrid system must be re-designed. (author)

  17. Feasibility study

    International Nuclear Information System (INIS)

    Gibbs, P.; Kalas, P.

    1975-01-01

    The feasibility study itself examines the technical, economic and financial implications of a nuclear power station in depth so as to make sure that nuclear power is the right course to take. This means that it is quite an expensive operation and it is to avoid wasting this money that a pre-feasibility study is carried out. This preliminary study should eliminate cases where the electrical system cannot absorb the capacity of a nuclear station of commercial size, where other sources of power such as hydro-electricity, gas or cheap coal would make nuclear obviously uneconomic or where no suitable sites exist. If this first rather simple survey shows that nuclear power is a credible solution to a utilities need for electricity or heat production plant, then the next stage is a full feasibility study. (orig./TK) [de

  18. Technical Feasibility Study of Thermal Energy Storage Integration into the Conventional Power Plant Cycle

    Directory of Open Access Journals (Sweden)

    Jacek D. Wojcik

    2017-02-01

    Full Text Available The current load balance in the grid is managed mainly through peaking fossil-fuelled power plants that respond passively to the load changes. Intermittency, which comes from renewable energy sources, imposes additional requirements for even more flexible and faster responses from conventional power plants. A major challenge is to keep conventional generation running closest to the design condition with higher load factors and to avoid switching off periods if possible. Thermal energy storage (TES integration into the power plant process cycle is considered as a possible solution for this issue. In this article, a technical feasibility study of TES integration into a 375-MW subcritical oil-fired conventional power plant is presented. Retrofitting is considered in order to avoid major changes in the power plant process cycle. The concept is tested based on the complete power plant model implemented in the ProTRAX software environment. Steam and water parameters are assessed for different TES integration scenarios as a function of the plant load level. The best candidate points for heat extraction in the TES charging and discharging processes are evaluated. The results demonstrate that the integration of TES with power plant cycle is feasible and provide a provisional guidance for the design of the TES system that will result in the minimal influence on the power plant cycle.

  19. Models of cognitive behavior in nuclear power plant personnel. A feasibility study: main report. Volume 2

    International Nuclear Information System (INIS)

    Woods, D.D.; Roth, E.M.; Hanes, L.F.

    1986-07-01

    This report contains the results of a feasibility study to determine if the current state of models human cognitive activities can serve as the basis for improved techniques for predicting human error in nuclear power plants emergency operations. Based on the answer to this questions, two subsequent phases of research are planned. Phase II is to develop a model of cognitive activities, and Phase III is to test the model. The feasibility study included an analysis of the cognitive activities that occur in emergency operations and an assessment of the modeling concepts/tools available to capture these cognitive activities. The results indicated that a symbolic processing (or artificial intelligence) model of cognitive activities in nuclear power plants is both desirable and feasible. This cognitive model can be built upon the computational framework provided by an existing artificial intelligence system for medical problem solving called Caduceus. The resulting cognitive model will increase the capability to capture the human contribution to risk in probabilistic risk assessments studies. Volume I summarizes the major findings and conclusions of the study. Volume II provides a complete description of the methods and results, including a synthesis of the cognitive activities that occur during emergency operations, and a literature review on cognitive modeling relevant to nuclear power plants. 112 refs., 10 figs

  20. Feasibility study on modernization of North Bangkok Thermal Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective to save energies and reduce global warming gas emission, a feasibility study was performed on the oil burning thermal power plant in the city of North Bangkok in Thailand to reconstruct the plant into a natural gas burning combined cycle power plant. In the project, the old facilities with an output of 237.8 MW using three steam turbines in total will be reconstructed into a plant comprising of two steam turbines for 256,2 MW and two gas turbines for 460.4 MW, or a facility of 716.6 MW in total. The plant construction will have the gas turbines, steam turbines, generators, and a waste heat recovered steam generator fixed on one axis, two of which will be installed. The gas turbines will use natural gas as fuel, and the steam turbines will be operated by steam from the waste heat recovered steam generator. As a result of the discussions, the reduction of the energy consumption for a period of 40 years will correspond to crude oil of 20,560 kt, while the reduction of the global warming gas emission will be 107,200 t-CO2. In addition, the energy saving cost will be 9-ton crude oil equivalent/one million yen, and the cost for reduction of the global warming gas emission will be 47 t-CO2/one million yen. (NEDO)

  1. Models of cognitive behavior in nuclear power plant personnel. A feasibility study: summary of results. Volume 1

    International Nuclear Information System (INIS)

    Woods, D.D.; Roth, E.M.; Hanes, L.F.

    1986-07-01

    This report summarizes the results of a feasibility study to determine if the current state of models of human cognitive activities can serve as the basis for improved techniques for predicting human error in nuclear power plants emergency operations. Based on the answer to this question, two subsequent phases of research are planned. Phase II is to develop a model of cognitive activities, and Phase III is to test the model. The feasibility study included an analysis of the cognitive activities that occur in emergency operations and an assessment of the modeling concepts/tools available to capture these cognitive activities. The results indicated that a symbolic processing (or artificial intelligence) model of cognitive activities in nuclear power plants is both desirable and feasible. This cognitive model can be built upon the computational framework provided by an existing artificial intelligence system for medical problem solving, called Caduceus. The resulting cognitive model will increase the capability to capture the human contribution to risk in probabilistic risk assessment studies. Volume 1 summarizes the major findings and conclusions of the study. Volume 2 provides a complete description of the methods and results, including a synthesis of the cognitive activities that occur during emergency operations, and a literature review on cognitive modeling relevant to nuclear power plants. 19 refs

  2. Preliminary study of environmental parameters associated with the feasibility of a polygeneration plant at Kennedy Space Center

    International Nuclear Information System (INIS)

    Barnes, G.D.

    1982-01-01

    The feasibility of a polygeneration plant at Kennedy Space Center was studied. Liquid hydrogen and gaseous nitrogen are the two principal products in consideration. Environmental parameters (air quality, water quality, biological diversity and hazardous waste disposal) necessary for the feasibility study were investigated. A National Environmental Policy Act (NEPA) project flow sheet was to be formulated for the environmental impact statement. Water quality criteria for Florida waters were to be established

  3. Site and feasibility studies of a first nuclear power plant in Morocco

    International Nuclear Information System (INIS)

    Righi, M.

    1988-11-01

    Basing on the estimated studies related to the evaluation of future needs of electrical energy, the launching of a nuclear power program in Morocco is confirmed necessary. A complete study of sites and feasibility has been carried out. Taking into account the site selection factors two sites: BIR ELHAR and SIDI BOULBRA have been kept as candidate sites. The evaluation of seismic and geotechnical risks of the power plant impact on the environment and risks related to human activities has led to privilege the SIDI BOULBRA site. The studies for confirming this site are summarized. 4 figs. (F.M.)

  4. Feasibility study for the partial conversion of a hydropower plant into a pumped-storage power plant: a case study of hydroelectric power plant La Barca (Asturias, Spain

    Directory of Open Access Journals (Sweden)

    E. Antuña Yudego

    2017-01-01

    Full Text Available Renewable energy sources have reported an unprecedented increase of global installed renewable power capacity. Against the advantages provided by this renewable power generation technology it should be taken into account an important issue: these intermittent energy sources supply a fluctuating output which is difficult to manage. Pumped-storage hydro power plants reappear in these circumstances as an efficient form of energy storage which allows to use reserves when necessary, enabling power generation output to cover continuously this energy demand. The present paper shows a simplified feasibility study of the partial conversion of hydropower plant La Barca, in Asturias, into a reversible storage through the development of an algorithm to simulate its operation according to electricity market prices. For this purpose, the operation in the deviation management market is considered and the technical modifications required for the conversion are shown. The estimation of costs and incomes present a feasible scenario.

  5. Feasibility study on rehabilitation of ICE San Antonio Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Costa Rica takes a power generation system using hydro power generation as the main source, and possesses medium-capacity gas turbines to supplement needs in the dry season and the peak load. However, a problem has come up that, in addition to the cost rise in gas turbine fuel, the power generation efficiency has been aggravating due to aged deterioration of the generators being used. In association therewith, the problem is now a factor to increase CO2 emission, which is a worldwide problem. Keeping in mind to link it to the clean development mechanism (CDM), the present project is, taking up the SAN ANTONIO power plant as the investigation object, intended to perform a comprehensive discussion on the CO2 emission reducing effect, profitability, and proliferation effect, by executing the conceptual plant design. The up-grading plan for thermal power generation systems in Costa Rica consists of replacement of the gas turbines, handling of phase modifiers, and achievement of the combined cycle. The plan agrees with the present feasibility study intended of CO2 emission reduction, consisting of the modification plan of the SAN ANTONIO power plant, that is the plan to replace the over-aged gas turbines at the power plant. Its necessity has been identified. It was disclosed that the project has the effects of reducing CO2 of 82,000 tons annually, and the investment can be recovered in nine years. (NEDO)

  6. Feasibility study for the implementation of NRTMA system for an industrial nuclear fuel fabrication plant

    International Nuclear Information System (INIS)

    Aparo, M.; Dionisi, M.; Graziani, M.; Remetti, R.

    1989-01-01

    In the frame of the problems arising from the fissile materials safeguards into the facilities of the nuclear fuel cycle, the International Safeguards devoted, in the recent years, R and D efforts on a new Dynamic Accountability procedures (Near Real Time Material Accountancy) appealing to the needs of timeliness in detecting diversion. This paper deals with a feasibility study of a NRTMA system to be applied to a nuclear fuel fabbrication plant for light water reactor. Such a feasibility study was performed by developing a dynamic model and a computer program, written in FORTRAN 77, in order to simulate all the processes and measurement procedures involved in the nuclear material accountancy

  7. FEASIBILITY STUDY OF GAS TREATMENT PLANT BASED ON AN EJECTOR SCRUBBER

    Directory of Open Access Journals (Sweden)

    S. Iu. Panov

    2014-01-01

    Full Text Available Summary. The article executed the feasibility study of various options for gas treatment. Rapid development of industry and transport worldwide in recent times raises the problem in the protection of habitat environment from harmful waste. In solving problems of flue gas treatment great attention is given to the economic characteristics and recycling techniques for capturing emissions and disposal must also meet the sanitary health requirements: flue gas treatment plants should not cause air or water pollution. The set objective is solved by developing a two-stage wet treatment system for pyrolysis gas based on ejector scrubbers. Their advantage - a central nozzle supply that allows the scrubber to operate on the principle of an ejector pump. Projected plant can be used in enterprises for processing of solid domestic and industrial waste, where there are steam and hot water boilers, whose operations result in contaminated gases emissions obtained with high temperatures. In particular, this installation can be applied at a cement plant in which a large amount of waste gases containing sulfur oxides is emitted. Assessment of market potential for the plant designed to treat waste gases in the cement factory is performed through a SWOT analysis. SWOT analysis results indicate the possibility of the treatment of exhaust gases without a high cost and with high gas treatment efficiency. Plant competitive analysis was done using an expert method in comparison with market competitors. Technical and economic indicators of the plant are presented. Return on investments is 46% and payback period of capital investments - 2.7 years.

  8. Feasibility study on rehabilitation of KESC gas turbine power plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As to power generation facilities of Karachi Electric Power Supply Corporation in Karachi (KESC), the Islamic Republic of Pakistan, feasibility study on the rehabilitation was conducted in consideration of the CDM (clean development mechanism) project. In Pakistan, 13 gas turbine power plants started operation at the same time as the time when the power plant studied this time started operation, and therefore it is predicted that they also have the same troubles caused by the aged deterioration. As the rehabilitation project, two cases were proposed: In Case 1, gas turbine and generator are both exchanged, and in Case 2, gas turbine is only exchanged, and generator is reused after repair. The work term is approximately 9 months in both cases. The initial investment is $84 million in Case 1 and $78 million in Case 2. The energy conservation effect per cost is 107 t/y/million yen and 101 t/y/million yen, respectively. Further, the amount of greenhouse effect gas reduction per cost is 330 t-CO2/y/million yen and 313 t-CO2/y/million yen, respectively. The effect of profits can be obtained after the depreciation period since the fuel price is reduced approximately 0.5%. (NEDO)

  9. Case studies on the feasibility of the transient analysis system STAR in German nuclear power plants

    International Nuclear Information System (INIS)

    Buettner, W.E.; Felkel, L.; Zapp, A.

    1984-01-01

    On the basis of distubances which actually have occurred in German nuclear power plants a case-study has been performed to evaluate the feasibility of the computer-based disturbance analysis system STAR. By means of a compact plant simulator the disturbances collected have been remodelled and anlysed, on-line, with the disturbance analysis system STAR. In the last phase of the project experiments have been performed with reactor operators to get their reaction to, and opinion on, computerbased-operator aids. (orig.) [de

  10. The environmental energy sector programme. Poland: Feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Danish Ministry of Energy has granted financial aid to the preparation of a feasibility study necessary for the procurement of a financial solution to the modernisation of the combined heat and power plant in the city of Zielona Gora.The overall objectives of the Feasibility Study are to: establish new efficient power capacity in the south-west region of Poland, increase the energy efficiency, reduce the impact on the environment, utilise the local natural gas available which cannot be used in the national gas grid and reduce the costs of energy supply.The specific objective of this feasibility study is to obtain the best possible financing of the erection of a new CPH plant in Zielona Gora. The plant shall be designed to utilise the local resources of natural gas and to supply heat to the district heating grid in accordance with long-term planning strategies. (EHS)

  11. Feasibility study of computerized presentation of procedures of a nuclear plant

    International Nuclear Information System (INIS)

    Takagawa, Kenichi; Niwa, Yuji; Urakami, Masahiro

    2010-01-01

    Introduction of a digital instrumentation control system is in progress in recent nuclear power plants, and an application of Computer Based Procedures (CBP) is being considered. The Institute of Nuclear Safety System, Incorporated has developed a system for a Computerized Presentation of Procedures (CPP) which corresponds to CBP. By fiscal year 2002, all items in the emergency operation procedures of a model plant were made displayable on the CPP. In 2003, the CPP instead of the paper based procedures was used for trial by the operators of a nuclear power plant in an actual training simulator, and feasibility of its practical application was evaluated. Based on the result, we considered subjects which should be taken into account in the future. As a result, improvements of CPP and its navigation system, etc. to enable operations with multi-procedures in parallel were extracted as primary subjects for introduction of CBP in the future as well as practical application of CPP. (author)

  12. Feasibility Study for Bioethanol Co-Location with a Coal Fired Power Plant: 29 November 2001--28 July 2002

    Energy Technology Data Exchange (ETDEWEB)

    2002-12-01

    This study looks at the feasibility of co-locating 30, 50, and 70 million gallon per year bioethanol facilities with coal fired power plants in Indiana and Nebraska. Corn stover is the feedstock for ethanol production in both cases.

  13. Recent progress in the feasibility study for the first nuclear power plant in Indonesia

    International Nuclear Information System (INIS)

    Subki, I.R.; Iskandar, A.; Supadi, S.

    1994-01-01

    In September 1989 the Indonesian Government decided to perform a Nuclear Power Plant feasibility study, including a comprehensive investigation of Muris site. This presentation reports on the progress to date in the two main components of this study: (a) the non-site studies, covering energy economics, financing, technical and safety aspects, the fuel cycle and waste management as well as general management aspects, and (b) site and environmental studies, covering field investigations, assessment of site selection, site qualification/evaluation, environmental, socio-economic and cultural impacts. The study is carried out under a comprehensive quality assurance programme developed by a consultancy company - NEWJEC Inc., which compiles with IAEA recommendations and was approved by BATAN. A summary of the main results, recommendations and general conclusions is presented. It is estimated that the total investment for the construction of 2 x 900 MWe or 3 x 600 MWe class Nuclear Power Plant units would be around US$7 to US$9 billion. 8 tabs

  14. Feasibility study on rehabilitation of MEPE gas turbine power plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Myanmar generates majority of the whole electric power by using thermal power plants consisting of single gas turbines, and gas and steam composite turbines. However, because of chronic power shortage and fund unavailability, the major gas turbines are being operated in quite inadequate environment. As a result, reduction in power generation efficiency has become manifest due to aged deterioration, increasing the quantity of CO2 emission. The present project is, in order to link it to the 'Clean Development Mechanism' being carried out with developing countries, and placing Tharkayta Power Plant as the object, intended to comprehensively discuss a rehabilitation program to renew the existing gas turbines with advanced ones, in relation with feasibility of the project implementation including the effect of CO2 emission reduction, profitability, and proliferation effects. A prospect was acquired that, by replacing the gas turbines alone with 25-MW class gas turbines, the plant output will increase to 97.2 MW (78.5 MW in the existing facilities) and the plant efficiency to 43.3% (36.5% in the existing facilities). The energy saving effect during a period of 40 years would be 708,000 (toe) as heat consumption converted to crude oil, and the CO2 emission reducing effect would be 2,160,000 (t-CO2), respectively. (NEDO)

  15. A new economic feasibility approach for solar chimney power plant design

    International Nuclear Information System (INIS)

    Okoye, Chiemeka Onyeka; Solyalı, Oğuz; Taylan, Onur

    2016-01-01

    Highlights: • A two-stage economic feasibility approach is proposed for the SCPP design. • The optimal size of the SCPP is determined by solving a nonlinear optimization model. • Energy demand and stochasticity of solar radiation and temperature are considered. • The proposed approach is evaluated on locations in Nigeria. • The proposed approach is an effective decision-making tool for the SCPP design. - Abstract: Solar chimney power plants have been accepted as one of the promising technologies for solar energy utilization. The objective of this study is to propose an effective approach to simultaneously determine the optimal dimensions of the solar chimney power plant and the economic feasibility of the proposed plant. For this purpose, a two-stage economic feasibility approach is proposed based on a new nonlinear programming model. In the first stage, the proposed optimization model which determines the optimal plant dimensions that not only minimize the discounted total cost of the system, but also satisfy the energy demand within a specified reliability taking into account the stochasticity of solar radiation and ambient temperature is solved using a commercial optimization solver that guarantees finding the global optimum. In the second stage, the net present value of building the plant is computed by deducting the discounted total cost found in the first stage from the present value of revenues obtained due to selling the electricity generated by the plant. The proposed approach is novel because it determines the optimal dimensions of the plant together with its economic feasibility by taking into account the energy demand and uncertainty in solar radiation and ambient temperature. The proposed approach is applied on a study in Potiskum, Nigeria, which reveals that building a plant with a collector diameter of 1128 m and chimney height of 715 m to Potiskum would be profitable for investors at an annual rate of return of 3% and would provide

  16. Feasibility Study for Co-Locating and Integrating Ethanol Production Plants from Corn Starch and Lignocellulosic Feedstocks (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    Wallace, R.; Ibsen, K.; McAloon, A.; Yee, W.

    2005-01-01

    Analysis of the feasibility of co-locating corn-grain-to-ethanol and lignocellulosic ethanol plants and potential savings from combining utilities, ethanol purification, product processing, and fermentation. Although none of the scenarios identified could produce ethanol at lower cost than a straight grain ethanol plant, several were lower cost than a straight cellulosic ethanol plant.

  17. Feasibility study about handling plant and logistics of rotted spruce for energy and pulpwood; Esiselvitys energia- ja teollisuuspuun kaesittelylaitteistosta ja logistiikasta

    Energy Technology Data Exchange (ETDEWEB)

    Laurila, P [Biowatti Oy, Espoo (Finland)

    1997-12-01

    The aim of this feasibility study is to clarify the handling demands, technical and logistical possibilities, profitabilities both outlays and benefits in combined energy- and pulpwood production from rotted spruce raw material. The results of the study will be taken into consideration, if a handling plant will be decided to build and demonstrate beside the Forssa biomass power plant. (orig.)

  18. Feasibility study of VLH hydro turbine installation at Nam Pung hydropower plant, Thailand

    Directory of Open Access Journals (Sweden)

    Weerapon Nuantong

    2016-10-01

    Full Text Available The aim of this research was to study the feasibility of installing a Very Low Head (VLH hydro turbine at downstream of the Nam Pung hydropower plant by increasing the potential of renewable energy sources for the Electricity Generating Authority of Thailand (EGAT. Due to the constraints of the local site, the water head level was limited to less than 2 meters and the flow rate to below 5 m3/ s. The hydro turbine selected was an axial flow turbine with performance of 86.4%. The outcome of the power output was 84.61 kW. Investment analysis was subsequently applied to estimate feasibility of the project using engineering economics. The analyses of results have shown that the project is worthwhile in terms of an investment decision. The payback period of actual price was 0.83 and 0.88 years and general price case of 3.68 and 4.04 years, along with an interest rate of 6.75% and 12.625% respectively. Projected project lifespan is 25 years.

  19. Feasibility study for co-locating and integrating ethanol production plants from corn starch and lignocellulosic feedstocks

    Energy Technology Data Exchange (ETDEWEB)

    Wallace, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ibsen, Kelly [National Renewable Energy Lab. (NREL), Golden, CO (United States); McAloon, Andrew [U.S. Department of Agriculture, Washington, D.C. (United States); Yee, Winnie [U.S. Department of Agriculture, Washington, D.C. (United States)

    2005-01-01

    Analysis of the feasibility of co-locating corn-grain-to-ethanol and lignocellulosic ethanol plants and potential savings from combining utilities, ethanol purification, product processing, and fermentation.

  20. Optimization, selection and feasibility study of solar parabolic trough power plants for Algerian conditions

    International Nuclear Information System (INIS)

    Boukelia, T.E.; Mecibah, M.S.; Kumar, B.N.; Reddy, K.S.

    2015-01-01

    viability study proposes Tamanrasset, as the best location for erection of a parabolic trough solar thermal power plant with a low LCOE of 7.55 ¢/kW h, and a high annual power generation (more than 266 GW h). According to the feasibility analysis, the semi-arid and arid Algerian sites are suitable for realization of PTSTPP with integrated TES and FBS; especially the southern locations (19°N–32°N, 8°W–12°E)

  1. Information on the feasibility study for the reracking in the fuel storage pools of the Juragua Nuclear Power Plant

    International Nuclear Information System (INIS)

    Rodriguez, J.M.; Rodriguez, I.; Lopez, D.; Guerra, R.; Rodriguez, M.; Garcia, F.

    1995-01-01

    During 1993, in the Juragua Nuclear Power Plants as engineering evaluation programme was initiated in the storage area of irradiated nuclear fuel, where work in order to determine the feasibility of capacity increase for storage of irradiated nuclear fuel at the fuel storage pools using poisoned compact close racks instead of the originally designed racks. The feasibility study is a fundamental activity of this programme for the 1994-1995 period. According to this study the prospects of assimilation of compact storage conditions in the fuel storage pools in unit number one and prolonged fuel storage pool are investigated

  2. Feasibilities of a Coal-Biomass to Liquids Plant in Southern West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    Bhattacharyya, Debangsu [West Virginia Univ., Morgantown, WV (United States); DVallance, David [West Virginia Univ., Morgantown, WV (United States); Henthorn, Greg [West Virginia Univ., Morgantown, WV (United States); Grushecky, Shawn [West Virginia Univ., Morgantown, WV (United States)

    2016-09-30

    This project has generated comprehensive and realistic results of feasibilities for a coal-biomass to liquids (CBTL) plant in southern West Virginia; and evaluated the sensitivity of the analyses to various anticipated scenarios and parametric uncertainties. Specifically the project has addressed economic feasibility, technical feasibility, market feasibility, and financial feasibility. In the economic feasibility study, a multi-objective siting model was developed and was then used to identify and rank the suitable facility sites. Spatial models were also developed to assess the biomass and coal feedstock availabilities and economics. Environmental impact analysis was conducted mainly to assess life cycle analysis and greenhouse gas emission. Uncertainty and sensitivity analysis were also investigated in this study. Sensitivity analyses on required selling price (RSP) and greenhouse gas (GHG) emissions of CBTL fuels were conducted according to feedstock availability and price, biomass to coal mix ratio, conversion rate, internal rate of return (IRR), capital cost, operational and maintenance cost. The study of siting and capacity showed that feedstock mixed ratio limited the CBTL production. The price of coal had a more dominant effect on RSP than that of biomass. Different mix ratios in the feedstock and conversion rates led to RSP ranging from $104.3 - $157.9/bbl. LCA results indicated that GHG emissions ranged from 80.62 kg CO2 eq to 101.46 kg CO2 eq/1,000 MJ of liquid fuel at various biomass to coal mix ratios and conversion rates if carbon capture and storage (CCS) was applied. Most of water and fossil energy were consumed in conversion process. Compared to petroleum-derived-liquid fuels, the reduction in GHG emissions could be between -2.7% and 16.2% with CBTL substitution. As for the technical study, three approaches of coal and biomass to liquids, direct, indirect and hybrid, were considered in the analysis. The process models including

  3. Feasibility study of technologies to aid in the diagnosis of nuclear plant transients

    International Nuclear Information System (INIS)

    Bertch, W.J.; Bray, M.A.; Esparza, V.; Fink, R.K.; Shepherd, J.C.; Venhuizen, J.R.

    1985-08-01

    A technical feasibility study was performed to identify and evaluate the various computerized techniques available to diagnose and identify nuclear power plant transients in support of improving operator response to emergencies. Five categories of methods were investigated: expert system technology, computerized alarm handling, data driven displays, estimation and failure detection, and fault tree/event tree techniques. Literature searches and personal contacts were used to obtain information on specific methods and their applications within these categories. A set of evaluation criteria was established and an Analytic Hierarchy Process evaluation of the methods was performed. An integrated approach for a computerized operator aid, combining the strong features from the various methods, appears to be the most promising. 91 refs., 1 tab

  4. High Falls Hydroelectric Plant feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Diezemann, Gustav A.

    1979-07-01

    This study was made in order to determine if re-activating the retired High Falls Hydro Station in New York would result in a more economical generation of some of the power required in the Central Hudson System than is being obtained with the oil-burning thermal plants. The findings show that the construction of a new plant is more economical than rehabilitation of the existing station. All new construction schemes are marginally unattractive at today's costs but are found to become profitable within a short period as alternative energy sources escalate in price. A new powerhouse with an installed capacity of 2390 kW proved most economical, and its construction is recommended.

  5. Feasibility study on energy conservation and reduction of CO2 emissions using RDF (refused derived fuel) at a Chinese cement plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The feasibility study was conducted on a project in China for energy saving and greenhouse gas emission reduction by introducing the energy-saving and alternative energy technologies in cement plants. The cement plant selected for the feasibility study is Shanghai Plant of Shanghai Allied Cement Co., Ltd. (SAC), for RDF receive and supply facility, chlorine bypass facility, exhaust heat power generation facility and RDF production facility. The study results indicate that the exhaust power generation can save energy of 4,700 tons/y as crude, or energy saving rate of 25.5%, and that replacing part of coal by RDF and exhaust power generation can reduce CO2 emissions by 25,500 and 18,500 tons/y, respectively. For the investment recovery, it is estimated that the investment can be recovered in 9 years, and the project value is 81.399 million Yuan with the initial investment and project profit in each year discounted to the present value. These results fail to satisfy the SAC's investment standards. (NEDO)

  6. Feasibility study on energy conservation and reduction of CO2 emissions using RDF (refused derived fuel) at a Chinese cement plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The feasibility study was conducted on a project in China for energy saving and greenhouse gas emission reduction by introducing the energy-saving and alternative energy technologies in cement plants. The cement plant selected for the feasibility study is Shanghai Plant of Shanghai Allied Cement Co., Ltd. (SAC), for RDF receive and supply facility, chlorine bypass facility, exhaust heat power generation facility and RDF production facility. The study results indicate that the exhaust power generation can save energy of 4,700 tons/y as crude, or energy saving rate of 25.5%, and that replacing part of coal by RDF and exhaust power generation can reduce CO2 emissions by 25,500 and 18,500 tons/y, respectively. For the investment recovery, it is estimated that the investment can be recovered in 9 years, and the project value is 81.399 million Yuan with the initial investment and project profit in each year discounted to the present value. These results fail to satisfy the SAC's investment standards. (NEDO)

  7. Feasibility study of a Green Power Plant. Final report. [Offshore pumped hydro storage

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-03-15

    This project is a technical evaluation and a feasibility study of a concept called the Green Power Plant (GPP), developed by Seahorn Energy Aps. The Green Power Plant is an offshore pumped hydro storage facility constructed from prefabricated elements and with integrated renewable energy production. Pumped hydro storage is a known technology with a proven roundtrip energy storage efficiency of 80%. The focus of the GPP project is on simplifying and industrializing the construction of the reservoir wall, thereby achieving a cost efficient solution. The reservoir structure is dependent on the site on which the reservoir is established, thus Kriegers Flak in the Baltic Sea has been chosen as basis for the technical evaluation. As soil conditions vary, the technical evaluations have been based on a general soil profile. A water depth of 25m has been chosen as basis for the evaluation. A reservoir with a diameter of 2 km has been evaluated as baseline scenario. Feasibility of the GPP was evaluated based on the cost and income estimates. For the baseline scenario an internal rate of return of 6.6% was found for a period of 35 years. A sensitivity analysis reveals internal rates of return over 35 years varying from 4.9% to 10.9%. Especially larger reservoir diameters increase profitability of the GPP. The results from this project will be utilized in raising funds for further development of the GPP concept. Seahorn Energy Aps aims at optimizing the wind turbine integration, the steel pile wall structure and the pump-turbine integration in a future project towards construction of a demonstration facility. (LN)

  8. Feasibility of converting a sugar beet plant to fuel ethanol production

    Energy Technology Data Exchange (ETDEWEB)

    Hammaker, G S; Pfost, H B; David, M L; Marino, M L

    1981-04-01

    This study was performed to assess the feasibility of producing fuel ethanol from sugar beets. Sugar beets are a major agricultural crop in the area and the beet sugar industry is a major employer. There have been some indications that increasing competition from imported sugar and fructose sugar produced from corn may lead to lower average sugar prices than have prevailed in the past. Fuel ethanol might provide an attractive alternative market for beets and ethanol production would continue to provide an industrial base for labor. Ethanol production from beets would utilize much of the same field and plant equipment as is now used for sugar. It is logical to examine the modification of an existing sugar plant from producing sugar to ethanol. The decision was made to use Great Western Sugar Company's plant at Mitchell as the example plant. This plant was selected primarily on the basis of its independence from other plants and the availability of relatively nearby beet acreage. The potential feedstocks assessed included sugar beets, corn, hybrid beets, and potatoes. Markets were assessed for ethanol and fermentation by-products saleability. Investment and operating costs were determined for each prospective plant. Plants were evaluated using a discounted cash flow technique to obtain data on full production costs. Environmental, health, safety, and socio-economic aspects of potential facilities were examined. Three consulting engineering firms and 3 engineering-construction firms are considered capable of providing the desired turn-key engineering design and construction services. It was concluded that the project is technically feasible. (DMC)

  9. Radiation processing of flue gases: Guidelines for feasibility studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    The aim of this publication is to facilitate the performance of feasibility studies for Electron Beam flue gas cleanup projects by providing guidelines to conduct these studies and compiling information on the state of the art. This document summarizes the contents of a feasibility study; discusses the main items in plant construction, measurement and control systems, radiation safety and building construction; and lists the required economic data for internationally funded projects.

  10. Radiation processing of flue gases: Guidelines for feasibility studies

    International Nuclear Information System (INIS)

    2000-12-01

    The aim of this publication is to facilitate the performance of feasibility studies for Electron Beam flue gas cleanup projects by providing guidelines to conduct these studies and compiling information on the state of the art. This document summarizes the contents of a feasibility study; discusses the main items in plant construction, measurement and control systems, radiation safety and building construction; and lists the required economic data for internationally funded projects

  11. A study on economic feasibility of biogas plant for a small town

    International Nuclear Information System (INIS)

    Ansari, S.H.

    2011-01-01

    Energy crisis is one of the major problems of our country now a day. We should emphasis on new energy resources to fulfill our demand. In renewable energy resources, biogas is one of them. Biogas is produced by anaerobic digestion of organic matters. In anaerobic digestion, biodegradable materials are decomposed into biogas by bacteria in the absence of air. Kitchen waste contain large amount of these biodegradable materials. The report of economic feasibility for biogas plant using kitchen waste of housing colony consisting of 200 houses for power generation and cooking purposes is carried out. (author)

  12. A feasibility study of perennial/annual plant species to restore soils contaminated with heavy metals

    Science.gov (United States)

    Zacarías, Montserrat; Beltrán, Margarita; Gilberto Torres, Luis; González, Abelardo

    A feasibility study was carried out to evaluate the application of perennial/annual plant species in a phytoextraction process of a previously washed industrial urban soil contaminated by nickel, arsenic and cupper. The plant species selected for this study were Ipomea (Ipomea variada); grass (Poa pratensis); grass mixture (Festuca rubra, Cynodon dactylon, Lolium multiforum, Pennisetum sp.); Monks Cress (Tropaeolum majus); ficus (Ficus benajamina) and fern (Pteris cretica). Soil was characterized and it presented the following heavy metals concentrations (dry weight): 80 mg of Ni/kg, 456-656 mg of As/kg and 1684-3166 mg of Cu/kg. Germination and survival in contaminated soil tests were conducted, from these, P. pratensis was discarded and the rest of plant species tested were used for the phytoextraction selection test. After 4 months of growth, biomass production was determined, and content of Ni, As and Cu was analyzed in plant’s tissue. Metal biological absorption coefficient (BAC), bio-concentration factor (BCF) and translocation factor (TF), were calculated. Regarding to biomass generation it was observed, in every case, an inhibition of the plant growth compared with blanks sown in a non contaminated soil; inhibition ranged from 22.5% for the Monk cress to 98% for Ipomea. Even though the later presented high BAC, BCF and TF, its growth was severely inhibited, and therefore, due its low biomass generation, it is not recommended for phytoextraction under conditions for this study. Heavy metals concentrations in plant’s tissue (dry weight) were as high as 866 mg Cu/kg and 602 mg As/kg for grass mixture; and 825 mg As/kg was observed for Monks cress. Grass mixture and monks cress had high BAC, BCF and TF, also they had high metal concentrations in its plants tissues and the lowest growth inhibition rates; hence the application in phytoextraction processes of these plants is advisable.

  13. Feasibility study on replacement of power plant and desalination plant in Aktau City, Manghistau Region, Republic of Kazakhstan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas emission, feasibility study was conducted for improvement of efficiency of power generation/desalination facilities at MAEK Energy Center, Aktau City, Manghistau, Kazakhstan. Presently, the main facilities are the conventional natural gas fired power plant, evaporation type seawater desalination facility, hot water production facility, etc. In the project, introduction of the following was planned to be made: cogeneration facility composed of two units of 1,100-degree C class gas turbine and reverse osmosis (RO) type desalination facility for drinking water production with a capacity of 50,000 t/d. As a result of the study, the energy conservation amount in this project was 151,900-165,400 toe/y in power generation facility, and the greenhouse effect gas reduction amount was 355,000-387,000 t-CO2/y in power generation facility and 268,000 t-CO2/y in desalination facility. The construction cost and operational cost of the plant were 45.7 billion yen and 2.8 billion yen/y. In the economical estimation, ROI and ROE before tax were 7.4 and 34.8, respectively, which were considered to be appropriate values as social infrastructure related conditions. (NEDO)

  14. Feasibility of landmine detection using transgenic plants

    Science.gov (United States)

    Deyholos, Michael; Faust, Anthony A.; Miao, Minmin; Montoya, Rebecca; Donahue, D. Aaron

    2006-05-01

    Genetically modified plants that detect TNT and its degradation products are potentially powerful aids in humanitarian demining and detection of unexploded ordnance. Although the feasibility of TNT detection by plants and microorganisms has been demonstrated by several research teams world wide, thus far, none of these previously demonstrated systems has the sensitivity and specificity to be effective under field conditions. We are using two approaches to increase the potential effectiveness of these and related biological detection systems. First, we are expanding the repertoire of explosive-responsive promoters by conducting DNA microarray experiments with plants treated with TNT-degradation products, and characterizing the inducibility of reporter gene expression by these promoters. Second, we are evaluating the dynamics and limiting factors in the transmission of artificial signals from roots to shoots. This will increase the ability of soil-based TNT perception strategies to effect human-readable changes in shoot morphology as part of a practical plant-based explosives detection system.

  15. Technical and economical feasibility studies and preliminary plan of a heavy water plant by the criogenic distillation method of hydrogen

    International Nuclear Information System (INIS)

    Dias Vargas, F.

    1983-01-01

    This paper presents the pre-feasibility study of a heavy water production plant, both from the technical and economical point of view. Criogenic distillation of hydrogen is used as the final enrichment stage. The deuterium source is water treated previously by a process of enrichment based on the water-hydrogen isotopic exchange. The economical analysis is aimed at the study of the feasibility of the installation of a heavy water moderated reaction in Chile. General properties of heavy water are presented and also the various materials of its enrichment at the industrial scale. The plant itself has a first stage based on the water-hydrogen isotopic exchange procesS, where deuterium is extracted from the water by the hydrogen which is subsequently treated in a criogenic distillation stage. An important fact of the plant analysis is the calculation of heat exchangers mainly in relation to the problem posed by tHe hydrogen's low point of liquifaction. The distillation units are also treated and designed. The economic evaluation produces project diScount rates of 15.71% and 21.97%, for 25 tons/year and 40 tons/year of production capacity. The heavy water price used for these evaluation was 600 $/Kg

  16. Feasibility study of fuel grade ethanol plant for Alcohol Fuels of Mississippi, Inc. , Vicksburg, Mississippi

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    The results are presented of a feasibility study performed to determine the technical and economic viability of constructing an alcohol plant utilizing the N.Y.U. continuous acid hydrolysis process to convert wood wastes to fuel grade alcohol. The following is a summary of the results: (1) The proposed site in the Vicksburg Industrial Foundation Corporation Industrial Park is adequate from all standpoints, for all plant capacities envisioned. (2) Local hardwood sawmills can provide adequate feedstock for the facility. The price per dry ton varies between $5 and $15. (3) Sale of fuel ethanol would be made primarily through local distributors and an adequate market exists for the plant output. (4) With minor modifications to the preparation facilities, other waste cellulose materials can also be utilized. (5) There are no anticipated major environmental, health, safety or socioeconomic risks related to the construction and operation of the proposed facility. (6) The discounted cash flow and rate of return analysis indicated that the smallest capacity unit which should be built is the 16 million gallon per year plant, utilizing cogeneration. This facility has a 3.24 year payback. (7) The 25 million gallon per year plant utilizing cogeneration is an extremely attractive venture, with a zero interest break-even point of 1.87 years, and with a discounted rate of return of 73.6%. (8) While the smaller plant capacities are unattractive from a budgetary viewpoint, a prudent policy would dictate that a one million gallon per year plant be built first, as a demonstration facility. This volume contains process flowsheets and maps of the proposed site.

  17. Economic and technical feasibility study of compressed air storage

    Energy Technology Data Exchange (ETDEWEB)

    1976-03-01

    The results of a study of the economic and technical feasibility of compressed air energy storage (CAES) are presented. The study, which concentrated primarily on the application of underground air storage with combustion turbines, consisted of two phases. In the first phase a general assessment of the technical alternatives, economic characteristics and the institutional constraints associated with underground storage of compressed air for utility peaking application was carried out. The goal of this assessment was to identify potential barrier problems and to define the incentive for the implementation of compressed air storage. In the second phase, the general conclusions of the assessment were tested by carrying out the conceptual design of a CAES plant at two specific sites, and a program of further work indicated by the assessment study was formulated. The conceptual design of a CAES plant employing storage in an aquifer and that of a plant employing storage in a conventionally excavated cavern employing a water leg to maintain constant pressure are shown. Recommendations for further work, as well as directions of future turbo-machinery development, are made. It is concluded that compressed air storage is technically feasible for off-peak energy storage, and, depending on site conditions, CAES plants may be favored over simple cycle turbine plants to meet peak demands. (LCL)

  18. Investigation and feasibility study of a former manufactured gas plant site in Tuttlingen (Germany), based on individually determined clean-up criteria

    Energy Technology Data Exchange (ETDEWEB)

    Heinecker, C.; Pickel, H.-J.; Duffek, J. [HPC Harress Pickel Consult GmbH, Fuldatal (Germany)

    1995-12-31

    At the request of the former plant operator, a manufactured gas plant site in Tuttlingen, Germany, was investigated from 1988 through 1992 for subsurface soil contamination resulting from former activities. In 1991, the contents of the former tar pits and parts of the adjacent soil contaminations were removed in the course of clean-up activities by means of excavation and disposed at a special waste site. Following an initial risk assessment, a remedial investigation was carried out in order to further delineate the contaminated areas as well as to create a reliable database for a feasibility study of remedial alternatives. The feasibility study followed applicable Baden-Wurttemberg state guidelines, including the following elements: Determination of the clean-up goals for soils; pre-selection of the clean-up procedure; cost estimate; cost-effectiveness study; Non-monetary evaluation; and total evaluation/clean-up proposal. The following general alternatives were available for the definition of clean-up goals: background values (`H-values`); general guidelines values (`SZ-values`); and clean-up goals based on contaminant fate and transport as well as site use (`SZA-values`).

  19. Feasibility study for a 10-MM-GPY fuel ethanol plant, Brady Hot Springs, Nevada. Volume 1. Process and plant design

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    An investigation was performed to determine the technical and economic viability of constructing and operating a geothermally heated, biomass, motor fuel alcohol plant at Brady's Hot Springs. The results of the study are positive, showing that a plant of innovative, yet proven design can be built to adapt current commerical fermentation-distillation technology to the application of geothermal heat energy. The specific method of heat production from the Brady's Hot Spring wells has been successful for some time at an onion drying plant. Further development of the geothermal resource to add the capacity needed for an ethanol plant is found to be feasible for a plant sized to produce 10 million gallons of motor fuel grade ethanol per year. A very adequate supply of feedgrains is found to be available for use in the plant without impact on the local or regional feedgrain market. The effect of diverting supplies from the animal feedlots in Northern Nevada and California will be mitigated by the by-product output of high-protein feed supplements that the plant will produce. The plant will have a favorable impact on the local farming economies of Fallon, Lovelock, Winnemucca and Elko, Nevada. It will make a positive and significant socioeconomic contribution to Churchill County, providing direct employment for an additional 61 persons. Environmental impact will be negligible, involving mostly a moderate increase in local truck traffic and railroad siding activity. The report is presented in two volumes. Volume 1 deals with the technical design aspects of the plant. The second volume addresses the issue of expanded geothermal heat production at Brady's Hot Springs, goes into the details of feedstock supply economics, and looks at the markets for the plant's primary ethanol product, and the markets for its feed supplement by-products. The report concludes with an analysis of the economic viability of the proposed project.

  20. Selected bibliography for the extraction of uranium from seawater: chemical process and plant design feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Binney, S.E.; Polkinghorne, S.T.; Jante, R.R.; Rodman, M.R.; Chen, A.C.T.; Gordon, L.I.

    1979-02-01

    A selected annotated bibliography of 521 references was prepared as a part of a feasibility study of the extraction of uranium from seawater. For the most part, these references are related to the chemical processes whereby the uranium is removed from the seawater. A companion docment contains a similar bibliography of 471 references related to oceanographic and uranium extraction plant siting considerations, although some of the references are in common. The bibliography was prepared by computer retrieval from Chemical Abstracts, Nuclear Science Abstracts, Energy Data Base, NTIS, and Oceanic Abstracts. References are listed by author, country of author, and selected keywords.

  1. Selected bibliography for the extraction of uranium from seawater: chemical process and plant design feasibility study

    International Nuclear Information System (INIS)

    Binney, S.E.; Polkinghorne, S.T.; Jante, R.R.; Rodman, M.R.; Chen, A.C.T.; Gordon, L.I.

    1979-02-01

    A selected annotated bibliography of 521 references was prepared as a part of a feasibility study of the extraction of uranium from seawater. For the most part, these references are related to the chemical processes whereby the uranium is removed from the seawater. A companion docment contains a similar bibliography of 471 references related to oceanographic and uranium extraction plant siting considerations, although some of the references are in common. The bibliography was prepared by computer retrieval from Chemical Abstracts, Nuclear Science Abstracts, Energy Data Base, NTIS, and Oceanic Abstracts. References are listed by author, country of author, and selected keywords

  2. A feasibility study on the longer cycle operation of Yonggwang nuclear power plants 3 and 4 (3 rd quarter report)

    Energy Technology Data Exchange (ETDEWEB)

    Zee Sung Kyun; Song, Jae Woong; Ha, Young Joon; Kim, Kyu Tae [Korea Advanced Institute of Science and Technolgoy, Taejon (Korea, Republic of)

    1996-04-01

    In this report, described are results of the feasibility study on applying for the 18-month cycle in Korean Standard Nuclear Power Plants (KSNPs). This report contains results of safety and economic evaluations, radiation source analysis, an effect on changing the calibration period for each component of NSSS, and review on the related regulating codes. 12 refs., 34 tabs., 28 figs. (author)

  3. [Plant hydroponics and its application prospect in medicinal plants study].

    Science.gov (United States)

    Zeng, Yan; Guo, Lan-Ping; Huang, Lu-Qi; Sun, Yu-Zhang

    2007-03-01

    This article introduced the theorem and method of hydroponics. Some examples of studies in agriculture and forestry were presented, the effects of elements, environmental stress and hormones on physiology of medicinal plants by using hydroponics were analyzed. It also introduced the feasibility and advantage of hydroponics in intermediate propagation and allelopathy of medicinal plant. And finally it made the conclusion that the way of hydroponics would be widely used in medicinal plant study.

  4. Cogeneration feasibility study in the Gulf States Utilities service area

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Sites in the Gulf States Utilities service are considered for cogeneration feasibility studies. The sources of steam considered for the Orange, Texas and Geismar, Lake Charles, and North Baton Rouge, Louisiana sites include oil, coal, HTGR steamers, consolidated nuclear steam system, atmospheric fluidized-bed coal combustion, and coal gasification. Concepts concerning cogeneration fuel systems were categorized by technical applicability as: current technology (pulverized coal-fired boilers and fuel oil-fired boilers), advanced technology under development (HTGR steamers and the CNSS), and advanced technology for future development (atmospheric fluidized-bed boilers and coal gasification). In addition to providing data on cogeneration plant generally useful in the US, the study determined the technical and economic feasibility of steam and electric power cogeneration using coal and nuclear fuels for localized industrial complexes. Details on site selection, plant descriptions, cost estimates, economic analysis, and plant schedule and implementation. (MCW)

  5. Feasibility study on plan to utilize livestock excreta for bio-gas in Miyagi Village (Gunma Prefecture). Investigations on projects including district new energy vision establishment in fiscal 2000, and on feasibility for commercialization; Miyagimura chikusan haisetsubutsu bio gas ka energy riyo keikaku feasibility study. 2000 nendo chiiki shin energy vision sakutei nado jigyo, jigyoka feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    With objectives to utilize energy available from livestock excreta, and to properly treat the livestock excreta, a feasibility study was performed on a plan to utilize livestock excreta for bio-gas. The system to be developed is a livestock wastes treatment system to utilize gas generated by efficiently fermenting the excreta as fuel, and residual sludge solids as compost. The activity achievements were put into order by the following nine items: 1) purpose of the feasibility study, 2) method for the feasibility study, 3) the situation where the livestock industry and the hog raising industry were selected as the object of the investigation, 4) properties of hog excreta, characteristics in urine foul water treatment, technologies for urine foul water treatment (biological treatment), 5) bio-gasification of livestock wastes, 6) the basic conditions for investigating the demonstration bio-bas plants, 7) proposals and standard cases of the demonstration bio gas plants, 8) discussions and positioning of the basic system for the demonstration bio gas plants, and 9) conclusion. (NEDO)

  6. Feasibility Study on HYSOL CSP

    DEFF Research Database (Denmark)

    Nielsen, Lars Henrik; Baldini, Mattia; Skytte, Klaus

    2016-01-01

    integrated HYSOL concept, therefore, becomes a fully dispatchable (offering firm power) and fully renewable energy source (RES) based power supply alternative, offering CO2-free electricity in regions with sufficient solar resources. The economic feasibility of HYSOL configurations is addressed in this paper....... The CO2 free HYSOL alternative is discussed relative to conventional reference firm power generation technologies. In particular the HYSOL performance relative to new power plants based on natural gas (NG) such as open cycle or combined cycle gas turbines (OCGT or CCGT) are in focus. The feasibility...

  7. Biogas Koczala. Biogas project in Koczala. Feasibility study. Technical report

    International Nuclear Information System (INIS)

    2004-08-01

    The present production of district heating in Koczala is based on coal. The district heating system is worn out technically and economically and according to the 2001 Energy Plan of Koczala the district heating plant shall be converted to a combination of a biogas fired CHP and a wood chip boiler. The overall objective of this project is to access the feasibility and viability construction an operation of a biogas plant owned by the co-operative agricultural company, Poldanor S.A. The feasibility study includes: 1) Availability of organic waste in the Koczala area, 2) Possibilities of using energy crops in the biogas plant, 3) Possibilities of receiving grants from the Polish National Fund for Environmental Protection, the new EU regional funds and through the joint implementation market (CO 2 quotas), 4) Alternative locations of the biogas plant and the CHP unit, 5) Alternative strategies for selling electricity and heat, 6) Organisational issues (ownership). This report concludes that implementing the biogas project is environmentally and financially feasible and viable. If organic waste and/or maize silage can be provided and gasified without problems, the plant can supply as well the Koczala farm as the fodder mill with steam and heat, and also supply Koczala district heating system with approx. 75% of yearly heat consumption. Furthermore, electricity is supplied to the fodder mill and the public grid. (BA)

  8. Gasohol: economic feasibility study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    David, M. L.; Hammaker, G. S.; Buzenberg, R. J.; Wagner, J. P.

    1978-07-01

    This report was prepared by Development Planning and Research Associates, Inc. under a contract with the Energy Research and Development Center of the University of Nebraska in cooperation with the Agricultural Products Industrial Utilization Committee and the State of Nebraska. Funding for this study was provided to the Energy Research and Development Center by the U.S. Department of Energy and the Old West Regional Commission. The primary objective of the study was to: determine the fiscal and market conditions under which the production of gasohol would be profitable for private producers. For purposes of this study, gasohol is a motor fuel consisting of 10 percent agriculturally-derived anhydrous ethanol and 90 percent unleaded gasoline. The study assumes that gasohol can be a fuel substitute for gasoline; indeed, the cost of gasoline will significantly influence that for gasohol. Gasoline prices are determined by factors external to ethanol; thus, the economic feasibility study of gasohol is in large part an economic feasibility study of fuel-grade ethanol production. More specifically, the study examined the following: the technical aspects of distributing, marketing, and using gasohol; the costs of the distribution and marketing of ethanol and gasohol; the energy balance of ethanol production; the cost of producing ethanol; the factors influencing ehtanol plant size and location; and the conditions that would make ethanol economicaly feasible for private producers.

  9. Feasibility study on floating nuclear power station

    International Nuclear Information System (INIS)

    Kajima, Ryoichi

    1987-01-01

    It is stipulated that nuclear power plants are to be built on solid rock bases on land in Japan. However, there are a limited number of appropriate siting grounds. The Central Research Institute of Electric Power Industry has engaged since 1981 in the studies on the construction technology of power plants, aiming at establishing new siting technology to expand the possible siting areas for nuclear power plants. Underground siting is regarded as a proven technology due to the experience in underground hydroelectric power plants. The technology of siting on quaternary ground is now at the stage of verification. In this report, the outline of floating type offshore/inshore siting technology is introduced, which is considered to be feasible in view of the technical and economical aspects. Three fixed structure types were selected, of which the foundations are fixed to seabed, plant superstructures are above sea surface, and which are floating type. Aiming at ensuring the aseismatic stability of the plant foundations, the construction technology is studied, and the structural concept omitting buoyancy is possible. The most practical water depth is not more than 20 m. The overall plant design, earthquake isolation effect and breakwater are described. (Kako, I.)

  10. B Plant process piping replacement feasibility study

    International Nuclear Information System (INIS)

    Howden, G.F.

    1996-01-01

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace

  11. Feasibility study of the IE-SASW method for nondestructive evaluation of containment building structures in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, D.S. E-mail: dskim@kaist.ac.kr; Kim, H.W. E-mail: hwk@kaist.ac.kr; Seo, W.S.; Choi, K.C.; Woo, S.K

    2003-02-01

    The IE-SASW method, a combination of impact-echo (IE) acoustics with spectral analysis of surface waves (SASW), is proposed as a newly developed nondestructive testing method in concrete structures. This feasibility study examines the IE technique and uses elastic P-wave velocity data as measured from the SASW method on concrete members in nuclear power plant containment structures. It was shown that both the thickness of the concrete specimens used in this study and the depth of the introduced defects (i.e. voids) could be identified by the IE-SASW method. In contrast, the reinforced steel bar itself could not be identified by the IE-SASW method. Additionally, GPR (ground penetrating radar) techniques were used to examine the same specimens in order to establish some level of performance and reliability to compare with the performance of the IE-SASW method. The GPR method provides an objective and reliable image corresponding to the reinforced steel bars. The experimental studies show that it is more feasible to use the IE-SASW method rather than GPR to detect voids that were positioned beneath the steel reinforcing bars in the concrete specimens.

  12. Feasibility study on small modular reactors for modern microgrids

    Energy Technology Data Exchange (ETDEWEB)

    Islam, R.; Gabbar, H.A., E-mail: hossam.gabbar@uoit.ca [Univ. of Ontario Inst. of Technology, Faculty of Energy Systems and Nuclear Science, Oshawa, Ontario (Canada)

    2013-07-01

    Microgrid is a solution of conventional power grid problem and offer sustainable decentralized power system. Microgrid with modern distributed energy resources (DER) could play an important role to alleviate dependency on the main electricity grid. Distributed energy resource comprises wind turbine, solar photovoltaic, diesel generator, gas engine, micro turbine, fuel cells, etc.Due to the gap between typical loads and supply within microgrid, larger scale energy generation could provide a possible solution to balance power demand and supply. Feasibility study of Small Nuclear Power Plant, such as Small Modular reactor (SMR), within microgrids could be achieved via different cases. To achieve the target, a comprehensive feasibility study is conducted on microgrid with SMR through electricity generation profiles, geographical and environmental assessment, as well as cost analysis using simulation practices and data analysis.Also potency of SMRs is analyzed. Parameters and Key Performance Indicators (KPIs) could be analyzed to achieve feasible solution of microgrids with small modular reactor (SMR) to improve the overall microgrid performance.The study shows that SMR could be a feasible solution if microgrid parameters are selected properly. (author)

  13. Feasibility study on small modular reactors for modern microgrids

    International Nuclear Information System (INIS)

    Islam, R.; Gabbar, H.A.

    2013-01-01

    Microgrid is a solution of conventional power grid problem and offer sustainable decentralized power system. Microgrid with modern distributed energy resources (DER) could play an important role to alleviate dependency on the main electricity grid. Distributed energy resource comprises wind turbine, solar photovoltaic, diesel generator, gas engine, micro turbine, fuel cells, etc.Due to the gap between typical loads and supply within microgrid, larger scale energy generation could provide a possible solution to balance power demand and supply. Feasibility study of Small Nuclear Power Plant, such as Small Modular reactor (SMR), within microgrids could be achieved via different cases. To achieve the target, a comprehensive feasibility study is conducted on microgrid with SMR through electricity generation profiles, geographical and environmental assessment, as well as cost analysis using simulation practices and data analysis.Also potency of SMRs is analyzed. Parameters and Key Performance Indicators (KPIs) could be analyzed to achieve feasible solution of microgrids with small modular reactor (SMR) to improve the overall microgrid performance.The study shows that SMR could be a feasible solution if microgrid parameters are selected properly. (author)

  14. ECONOMICS AND FEASIBILITY OF RANKINE CYCLE IMPROVEMENTS FOR COAL FIRED POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Richard E. Waryasz; Gregory N. Liljedahl

    2004-09-08

    ALSTOM Power Inc.'s Power Plant Laboratories (ALSTOM) has teamed with the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL), American Electric Company (AEP) and Parsons Energy and Chemical Group to conduct a comprehensive study evaluating coal fired steam power plants, known as Rankine Cycles, equipped with three different combustion systems: Pulverized Coal (PC), Circulating Fluidized Bed (CFB), and Circulating Moving Bed (CMB{trademark}). Five steam cycles utilizing a wide range of steam conditions were used with these combustion systems. The motivation for this study was to establish through engineering analysis, the most cost-effective performance potential available through improvement in the Rankine Cycle steam conditions and combustion systems while at the same time ensuring that the most stringent emission performance based on CURC (Coal Utilization Research Council) 2010 targets are met: > 98% sulfur removal; < 0.05 lbm/MM-Btu NO{sub x}; < 0.01 lbm/MM-Btu Particulate Matter; and > 90% Hg removal. The final report discusses the results of a coal fired steam power plant project, which is comprised of two parts. The main part of the study is the analysis of ten (10) Greenfield steam power plants employing three different coal combustion technologies: Pulverized Coal (PC), Circulating Fluidized Bed (CFB), and Circulating Moving Bed (CMB{trademark}) integrated with five different steam cycles. The study explores the technical feasibility, thermal performance, environmental performance, and economic viability of ten power plants that could be deployed currently, in the near, intermediate, and long-term time frame. For the five steam cycles, main steam temperatures vary from 1,000 F to 1,292 F and pressures from 2,400 psi to 5,075 psi. Reheat steam temperatures vary from 1,000 F to 1,328 F. The number of feedwater heaters varies from 7 to 9 and the associated feedwater temperature varies from 500 F to 626 F. The main part of the

  15. Methodology study: Co-generation feasibility at sawmills

    International Nuclear Information System (INIS)

    Host, J.

    1991-01-01

    This report discussed the various factors that should be studied and evaluated before establishing a cogeneration plant. The results of three case studies and a survey of energy needs in smaller and medium size sawmills are also presented. In general, cogeneration is feasible for supplying electric energy required for processing logs using fuelbark and other residues from the manufacturing process. A rebuilt turbine-generator unit is an initial cost saving alternative that is advantageous throughout the life of the operation

  16. Economic feasibility of heat supply from nuclear power plants in the United States

    International Nuclear Information System (INIS)

    Roe, K.K.; Oliker, I.

    1987-01-01

    Nuclear energy is regarded as competitive for urban district heating applications. Hot water heat transoport systems of up to 50 miles are feasible for heat loads over 1500 MWt, and heat load density of over 130 MWt/mi 2 is most suitable for nuclear applications. An incremental approach and a nuclear plant design provision for future heat extraction are recommended. Nuclear district heating technology status is discussed, particularly turbine design. Results of a study for retrofitting a major existing nuclear power plant to cogeneration operation are presented. The study indicates that for transmission distances up to 20 miles it is economical to generate and transport between 600 and 1200 MWt of district heat (author)

  17. Outfall 51 air stripping feasibility study for the Reduction of Mercury in Plant Effluent (RMPE) Project. Revision 1

    International Nuclear Information System (INIS)

    1997-01-01

    Within the US Department of Energy's Oak Ridge Y-12 Plant there are a number of industrial wastewater discharge points or outfalls that empty into East Fork Poplar Creek (EFPC). EFPC originates within and runs continuously throughout the plant site and subsequently flows out the east end of the Y-12 Plant into the City of Oak Ridge. Mercury is present in outfall discharges due to contact of water with the soils surrounding past mercury-use buildings. As a result, the Reduction of Mercury in Plant Effluent (RMPE) Project was developed to achieve and maintain environmental compliance with regards to mercury, and, in particular with the National Pollutant Discharge Elimination System permit for the Y-12 Plant. To achieve a reduction in mercury loading to EFPC, a number of options have already been studied and implemented as part of the RMPE project. With the successful implementation of these options, Outfall 51 remains as a significant contributor to mercury load to EFPC. The primary purpose of this project is to determine the feasibility of removing mercury from contaminated spring water using air stripping. In order to accomplish this goal, a number of different areas were addressed. A pilot-scale unit was tested in the field using actual mercury-contaminated source water. Properties which impact the mercury removal via air stripping were reviewed to determine their effect. Also, enhanced testing was performed to improve removal efficiencies. Finally, the variable outfall flow was studied to size appropriate processing equipment for full-scale treatment

  18. Char-recirculation biomass gasification system--a site-specific feasibility study

    International Nuclear Information System (INIS)

    Purdy, K.R.; Kerr, C.P.; Hensley, B.D.

    1991-01-01

    A site-specific feasibility study was conducted for a char-recirculation biomass gasification plant which would dispose of the chippable solid residues of the area sawmills. The plant would receive green hardwood chips and convert them into active charcoal while producing process steam and electrical power. An economic analysis was performed on the basis of not-for-profit operation, marketing crushed active charcoal to a broker at a discounted price, and displacing purchased electric power. Given a market for the active charcoal, the plant was judged to be economically viable

  19. FY 2000 Fundamental study for promotion of jointed implementations. Feasibility study on energy saving effect and reducing CO2 emissions by use of RDF in cement plants in China; 2000 nendo Chugoku cement kojo ni okeru RDF katsuyo ni yoru shoene koka oyobi nisanka tanso haishutsu sakugen ni kansuru feasibility study chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The feasibility study was conducted on a project in China for energy saving and greenhouse gas emission reduction by introducing the energy-saving and alternative energy technologies in cement plants. The cement plant selected for the feasibility study is Shanghai Plant of Shanghai Allied Cement Co., Ltd. (SAC), for RDF receive and supply facility, chlorine bypass facility, exhaust heat power generation facility and RDF production facility. The study results indicate that the exhaust power generation can save energy of 4,700 tons/y as crude, or energy saving rate of 25.5%, and that replacing part of coal by RDF and exhaust power generation can reduce CO2 emissions by 25,500 and 18,500 tons/y, respectively. For the investment recovery, it is estimated that the investment can be recovered in 9 years, and the project value is 81.399 million Yuan with the initial investment and project profit in each year discounted to the present value. These results fail to satisfy the SAC's investment standards. (NEDO)

  20. Mortality and career radiation doses for workers at a commercial nuclear power plant: feasibility study

    International Nuclear Information System (INIS)

    Goldsmith, R.; Boice, J.D. Jr.; Hrubec, Z.; Hurwitz, P.E.; Goff, T.E.; Wilson, J.

    1989-01-01

    Career radiation doses for 8,961 male workers at the Calvert Cliffs Nuclear Power Plant (CCNPP) were determined for both utility (n = 4,960) and contractor (n = 4,001) employees. Workers were followed from the time of first employment at CCNPP (including plant construction) to the end of 1984 (mean follow-up = 5.4 y). Plant operation began in 1975. The mean duration of employment was 1.9 y at CCNPP and 3.1 y in the nuclear industry. Career radiation doses were determined from dosimetry records kept by the utility company and the U.S. Nuclear Regulatory Commission (NRC). For all exposed workers, the average career dose was 21 mSv and was higher for contractor (30 mSv) than utility (13 mSv) workers. Career doses were also higher among those employed in the nuclear industry for greater than or equal to 15 y (111 mSv) and among workers classified as health physicists (56 mSv). Cumulative doses of greater than or equal to 50 mSv were received by 12% of the workers; the maximum career dose reported was 470 mSv. The availability of social security numbers for practically all employees facilitated record-linkage methods to determine mortality; 161 deaths were identified. On average the workers experienced mortality from all causes that was 15% less than that of the general population of the U.S., probably due to healthier members of the population being selected for employment. Our investigation demonstrates that historical information is available from which career doses could be constructed and that, in principle, it is feasible to conduct epidemiologic studies of nuclear power plant workers in the U.S. Although difficult, the approach taken could prove useful until such time as a comprehensive registry of U.S. radiation workers is established

  1. The environmental energy sector programme. Poland: Appendices to feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The appendices contain Energy Law, Act of 10 April 1997 and also more specific details from the feasibility study for the procurement of a financial solution to the modernisation of the combined heat and power plant in the city of Zielona Gora, Poland. (EHS)

  2. DPC loading feasibility study report

    International Nuclear Information System (INIS)

    Dafoe, R.E.; Lopez, D.A.; Williams, K.L.

    1997-11-01

    Disposal of radioactive wastes now stored at the Idaho Chemical Processing Plant at the Idaho National Engineering and Environmental Laboratory is mandated under a ''Settlement Agreement'' between the Department of Energy and the State of Idaho. This study investigates the feasibility of using the Dry Transfer Cell facility to package waste into Dual Purpose Canisters for interim storage at the adjacent Dry Storage System comprised of an interim storage pad with NUHOMS reg-sign storage modules. The wastes would then be road-ready for eventual disposal in a permanent repository. The operating period for these activities is expected to be from 2015 to 2035

  3. Feasibility analysis of aggressive cooldown in OPR-1000 nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Man Cheol; Jerng, Dong Wook

    2014-01-01

    Highlights: • We examine the feasibility of aggressive cooldown, particularly in OPR-1000 plants. • We review experimental and simulation results, EOPs, and time estimates. • Aggressive cooldown is, in general, expected to be performed successfully. • There is potential for failure to initiate aggressive cooldown in a timely manner. • Investigation on allowing higher cooldown rate in OPR-1000 plants is recommended. - Abstract: Aggressive cooldown is the action taken by main control room (MCR) operators to rapidly cool down and depressurize the reactor coolant system at the maximum allowed cooldown rate during a small break loss of coolant accident (SBLOCA) or a steam generator tube rupture accident with failure of high-pressure safety injection (HPSI) in a pressurized water reactor. We examined the feasibility of aggressive cooldown in OPR-1000 nuclear power plants by establishing success criteria based on experimental results and thermal–hydraulic code simulations, reviewing emergency operating procedures, and estimating the necessary time for MCR operators to initiate aggressive cooldown based on experimental results with licensed nuclear power plant operators. For an SBLOCA with a break size of 0.02 ft 2 combined with total failure of HPSI, we found that aggressive cooldown can generally be performed successfully, but there is potential for failure to initiate aggressive cooldown in a timely manner. We discuss the potential effects of introducing the Ultimate Procedure on reducing the core damage potential. Detailed analysis and further discussion are necessary to reduce uncertainties associated with aggressive cooldown and its positive effect on the safety of nuclear power plants

  4. Feasibility study on mental healthcare using indoor plants for office workers

    Science.gov (United States)

    Kubota, Tsuyoshi; Matsumoto, Hiroshi; Genjo, Kaori; Nakano, Takaoki

    2017-10-01

    In recent years, it has become a problem that office workers' stresses affect their intellectual productivity. As one of strategies mitigating the stress while working, many studies on the effect of indoor plants introduced into the office have been conducted. The psychological and physiological effects of indoor plants have been expected to mitigate the office workers' stresses. Also, the effects of green amenities such as improvement of productivity, control of the indoor thermal environment, relaxation and recovery of visual fatigue, and improvement of air quality have been expected. In this study, a field investigation on the green amenity effects of indoor plants on office workers' psychological and physiological responses in an actual office was conducted and discussed. This paper describes the measurement results of the physical environment and workers' psychological and physiological responses under the condition with shelves installed with indoor plants in an office room. It was suggested that indoor plants such as mint, basil and begonia, and a combination of red and green plants were effective for mitigating worker's stresses.

  5. Feasibility study on production of Co-60 in PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kyung Bae; Han, Hyon Soo; Joo, Po Kook

    2000-05-01

    The purpose of this study is to analyze the safeties and the economics for Co-60 production from Wolsung PHWR and to verify the feasibility on the manufacturing of the final Co-60 source for industrial irradiation. The feasibility of reactor conversion was carried out with KEPCO collaboration. Through the site survey on the experience of Gentililly-2 in Canada, a feasibility of plant conversion, changes in design, equipment and tools for Co-60 production was verified. It was estimated that the reactor conversion would not impose adverse impact on plant safety. For the encapsulation of radiation source and storage of the final products, a modification of concrete hot cell at KAERI was primary concerns. The installation and improvement of facilities are needed to avoid cross contamination and extra radiation exposure. Main items for these are pressure gauge, separated HEPA filter the ceiling separation, extra-shielding and ceiling hoist system. At present, storage pool has got admission based on 400 kCi. But it is necessary to seismic analysis and design improvement of shielding to store 10 MCi (Co-60) which is the estimated Co-60 capacity produced by 3 PHWRs. According to present investigation, a production of Co-60 by PHWR and RIPE was seemed to be an economically feasible business and it was also expected that a joint venture will be able to realize by cooperation with MDS Nordion Co.

  6. Feasibility study on production of Co-60 in PHWR

    International Nuclear Information System (INIS)

    Park, Kyung Bae; Han, Hyon Soo; Joo, Po Kook

    2000-05-01

    The purpose of this study is to analyze the safeties and the economics for Co-60 production from Wolsung PHWR and to verify the feasibility on the manufacturing of the final Co-60 source for industrial irradiation. The feasibility of reactor conversion was carried out with KEPCO collaboration. Through the site survey on the experience of Gentililly-2 in Canada, a feasibility of plant conversion, changes in design, equipment and tools for Co-60 production was verified. It was estimated that the reactor conversion would not impose adverse impact on plant safety. For the encapsulation of radiation source and storage of the final products, a modification of concrete hot cell at KAERI was primary concerns. The installation and improvement of facilities are needed to avoid cross contamination and extra radiation exposure. Main items for these are pressure gauge, separated HEPA filter the ceiling separation, extra-shielding and ceiling hoist system. At present, storage pool has got admission based on 400 kCi. But it is necessary to seismic analysis and design improvement of shielding to store 10 MCi (Co-60) which is the estimated Co-60 capacity produced by 3 PHWRs. According to present investigation, a production of Co-60 by PHWR and RIPE was seemed to be an economically feasible business and it was also expected that a joint venture will be able to realize by cooperation with MDS Nordion Co

  7. Evaluation of the feasibility, economic impact, and effectiveness of underground nuclear power plants. Final technical report

    International Nuclear Information System (INIS)

    1978-05-01

    Information on underground nuclear power plants is presented concerning underground nuclear power plant concepts; public health impacts; technical feasibility of underground concepts; economic impacts of underground construction; and evaluation of related issues

  8. Feasibility studies and technological innovation

    DEFF Research Database (Denmark)

    Hvelplund, Frede Kloster; Lund, Henrik; Sukkumnoed, Decharut

    2004-01-01

    The chapter offers a tool to conduct feasibility studies and focuses on how to make feasibility studies in a situation with environmental concerns, in which technological innovation and institutional chnages are among the objectives.......The chapter offers a tool to conduct feasibility studies and focuses on how to make feasibility studies in a situation with environmental concerns, in which technological innovation and institutional chnages are among the objectives....

  9. Whose Frames Mattered? The Feasibility Study in the Municipality of Tierp 1998-2000

    International Nuclear Information System (INIS)

    Johansson, Hanna Sofia

    2003-01-01

    In December 2001 SKB (the Swedish Nuclear Fuel and Waste Management Co) presented a ranking list of the eight feasibility studies carried out in Sweden. The feasibility study in Tierp was cited as showing that potentially good bedrock could be found in the municipality and SKB therefore asked to carry out a site investigation. Tierp is a neighbouring municipality to Oesthammar, a municipality that hosts nuclear power plants, with around 20,000 inhabitants and an area of 1543 km 2 . This paper focuses on why the Municipal Council in Tierp voted 'no' to further investigations even though SKB pointed out the municipality as having potentially good bedrock. In 1998 a feasibility study in Tierp was started. The arguments presented for a feasibility study were: the proximity to Forsmark nuclear power plant in Oesthammar, responsibilities for future generations, and that an investigation of the municipality could be used for other purposes. The main question this paper asks is the following: why did the Municipal Council in Tierp say 'no' to further investigations? This question is of interest since SKB claimed that Tierp had potentially good bedrock. The hypothesis is that the democratic models (representative democracy, discursive democracy or technocracy) present in the feasibility study and the boundary work carried out, i.e. how the boundary between science and politics was drawn, and which actors had access to the discussion on the public agenda, influenced the decision of the Council. The main sources used are interviews and a Swedish governmental investigation report about the feasibility studies. Twelve fairly open interviews with actors from the municipal organization, SKB, local opinion groups and the media were carried out. The questions cover how hey worked with the study, how the municipality organized its work, how they defined the nuclear waste issues and how they tried to communicate their views to other actors

  10. Feasibility study for biogas integration into waste treatment plants in Ghana

    Directory of Open Access Journals (Sweden)

    M. Mohammed

    2017-09-01

    Full Text Available Biogas (anaerobic digestion technology is one of the most viable renewable energy technologies today. However, its economic efficiency depends on the investment costs, costs of operating the biogas plant and optimum methane production. Likewise the profit level also rests on its use directly for cooking or conversion into electricity. The present study assessed the economic potential for a 9000 m3 biogas plant, as an alternative to addressing energy and environmental challenges currently in Ghana. A cost-benefit analysis of the installation of biogas plant at University of Ghana (Legon Sewerage Treatment Plant yielded positive net present values (NPV at the prevailing discount rate of 23%. Further the results demonstrate that installation of the plant is capital intensive. Biogas used for cooking was by far the most viable option with a payback period (PBP of 5 years. Sensitivity analysis also revealed cost of capital, plant and machinery as the most effective factors impacting on NPV and internal rate of return (IRR.

  11. Investigation/evaluation of water cooled fast reactor in the feasibility study on commercialized fast reactor cycle systems. Intermediate evaluation of phase-II study

    International Nuclear Information System (INIS)

    Kotake, Syoji; Nishikawa, Akira

    2005-01-01

    Feasibility study on commercialized fast reactor cycle systems aims at investigation and evaluation of FBR design requirement's attainability, operation and maintenance, and technical feasibility of the candidate system. Development targets are 1) ensuring safety, 2) economic competitiveness, 3) efficient utilization of resources, 4) reduction of environmental load and 5) enhancement of nuclear non-proliferation. Based on the selection of the promising concepts in the first phase, conceptual design for the plant system has proceeded with the following plant system: a) sodium cooled reactors at large size and medium size module reactors, b) a lead-bismuth cooled medium size reactor, c) a helium gas cooled large size reactor and d) a BWR type large size FBR. Technical development and feasibility has been assessed and the study considers the need of respective key technology development for the confirmation of the feasibility study. (T. Tanaka)

  12. Commercial low-Btu coal-gasification plant. Feasibility study: General Refractories Company, Florence, Kentucky. Volume I. Project summary. [Wellman-Galusha

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-11-01

    In response to a 1980 Department of Energy solicitation, the General Refractories Company submitted a Proposal for a feasibility study of a low Btu gasification facility for its Florence, KY plant. The proposed facility would substitute low Btu gas from a fixed bed gasifier for natural gas now used in the manufacture of insulation board. The Proposal from General Refractories was prompted by a concern over the rising costs of natural gas, and the anticipation of a severe increase in fuel costs resulting from deregulation. The proposed feasibility study is defined. The intent is to provide General Refractories with the basis upon which to determine the feasibility of incorporating such a facility in Florence. To perform the work, a Grant for which was awarded by the DOE, General Refractories selected Dravo Engineers and Contractors based upon their qualifications in the field of coal conversion, and the fact that Dravo has acquired the rights to the Wellman-Galusha technology. The LBG prices for the five-gasifier case are encouraging. Given the various natural gas forecasts available, there seems to be a reasonable possibility that the five-gasifier LBG prices will break even with natural gas prices somewhere between 1984 and 1989. General Refractories recognizes that there are many uncertainties in developing these natural gas forecasts, and if the present natural gas decontrol plan is not fully implemented some financial risks occur in undertaking the proposed gasification facility. Because of this, General Refractories has decided to wait for more substantiating evidence that natural gas prices will rise as is now being predicted.

  13. Feasibility study for adding a demand failure data collection system to the Nuclear Plant Reliability Data System. Final report

    International Nuclear Information System (INIS)

    Tashjian, B.M.; Logan, B.W.

    1983-07-01

    Southwest Research Institute (SwRI) is pleased to submit to Sandia National Laboratories this technical report as fulfillment of Task 5 of the proposal entitled A Feasibility Study for Adding a Duty Cycle Data Collection System to the Nuclear Plant Reliability Data System. The purpose of this report is to summarize the work as delineated in the proposal tasks and to recommend follow-on activities. Technical support for this work was provided by Duke Power Company (Duke), subcontractor to SwRI. The four tasks to be performed in conjunction with the Duty Cycle Data Collection Study (renamed in this report Demand Data Collection) were: define component population and measurable parameters; develop data collection and assessment methodologies; assess the impact on utilities; and assess the impact on NPRDS

  14. Feasibility Study for the Development of SCWR

    International Nuclear Information System (INIS)

    Bae, Y. Y.; Kim, H. Y.; Cho, B. H.

    2010-04-01

    - As a result of feasibility study, following conclusions were drawn: · SCWR can be a strong candidate to a large-scale electric power production plant. · Infra-structure for development of an economic and safe SCWR is well established. · It is recommended to focus on the university-level fundamental research along with an international collaboration, for the time being. - The supercritical heat transfer research produced a lot of database on the small tubes and annular channels. - Among the candidate materials such as T92, Incolloy 800, MA956, ODS showed the superior characteristics

  15. Aquatic Plant Control Research Program. Allelopathic Aquatic Plants for Aquatic Plant Management: A Feasibility Study

    Science.gov (United States)

    1989-10-01

    1978. " Ecotoxicology of aquatic plant communi- ties," Principles of Ecotoxicology , SCOPE Report 12, Chapter 11, pp 239-255. [Heavy metals, Pollutants...Phragmites communis and Equisetum limosum were cultivated . They found plant-plant influences depend on soil type. Typha latifolia, S. A2 lacustris, and

  16. Feasibility study for thermal treatment of solid tire wastes in Bangladesh by using pyrolysis technology

    International Nuclear Information System (INIS)

    Islam, M.R.; Joardder, M.U.H.; Hasan, S.M.; Takai, K.; Haniu, H.

    2011-01-01

    In this study on the basis of lab data and available resources in Bangladesh, feasibility study has been carried out for pyrolysis process converting solid tire wastes into pyrolysis oils, solid char and gases. The process considered for detailed analysis was fixed-bed fire-tube heating pyrolysis reactor system. The comparative techno-economic assessment was carried out in US$ for three different sizes plants: medium commercial scale (144 tons/day), small commercial scale (36 tons/day), pilot scale (3.6 tons/day). The assessment showed that medium commercial scale plant was economically feasible, with the lowest unit production cost than small commercial and pilot scale plants for the production of crude pyrolysis oil that could be used as boiler fuel oil and for the production of upgraded liquid-products.

  17. Demonstration of the economic feasibility of plant tissue culture for jojoba (Simmondsia chinensis) and Euphorbia spp

    Energy Technology Data Exchange (ETDEWEB)

    Sluis, C.

    1980-09-01

    The economic feasibility of plant tissue culture was demonstrated as applied to two plants: jojoba (Simmondsia chinensis) and Euphorbia spp. The gopher weed (Euphorbia lathyris) was selected as the species of Euphorbia to research due to the interest in this plant as a potential source of hydrocarbon-like compounds. High yield female selections of jojoba were chosen from native stands and were researched to determine the economic feasibility of mass producing these plants via a tissue culture micropropagation program. The female jojoba selection was successfully mass produced through tissue culture. Modifications in initiation techniques, as well as in multiplication media and rooting parameters, were necessary to apply the tissue culture system, which had been developed for juvenile seedling tissue, to mature jojobas. Since prior attempts at transfer of tissue cultured plantlets were unsuccessful, transfer research was a major part of the project and has resulted in a system for transfer of rooted jojoba plantlets to soil. Euphorbia lathyris was successfully cultured using shoot tip cultures. Media and procedures were established for culture initiation, multiplication of shoots, callus induction and growth, and root initiation. Well-developed root systems were not attained and root initiation percentages should be increased if the system is to become commercially feasible.

  18. Technical Analysis Feasibility Study on Smart Microgrid System in Sekolah Tinggi Teknik PLN

    Science.gov (United States)

    Suyanto, Heri

    2018-02-01

    Nowadays application of new and renewable energy as main resource of power plant has greatly increased. High penetration of renewable energy into the grid will influence the quality and reliability of the electricity system, due to the intermittent characteristic of new and renewable energy resources. Smart grid or microgrid technology has the ability to deal with this intermittent characteristic especially if these renewable energy resources integrated to grid in large scale, so it can improve the reliability and efficiency of the grid. We plan to implement smart microgrid system at Sekolah Tinggi Teknik PLN as a pilot project. Before the pilot project start, the feasibility study must be conducted. In this feasibility study, the renewable energy resources and load characteristic at the site will be measured. Then the technical aspect of this feasibility study will be analyzed. This paper explains that analysis of ths feasibility study.

  19. Plant systems/components modularization study. Final report

    International Nuclear Information System (INIS)

    1977-07-01

    The final results are summarized of a Plant Systems/Components Modularization Study based on Stone and Webster's Pressurized Water Reactor Reference Design. The program has been modified to include evaluation of the most promising areas for modular consideration based on the level of the Sundesert Project engineering design completion and the feasibility of their incorporation into the plant construction effort

  20. Feasibility of geothermal heat use in the San Bernardino Municipal Wastewater Treatment Plant. Final report, September 1980-June 1981

    Energy Technology Data Exchange (ETDEWEB)

    Racine, W.C.; Larson, T.C.; Stewart, C.A.; Wessel, H.B.

    1981-06-01

    The results of the feasibility study for utilizing low temperature geothermal heat in the City of San Bernardino Wastewater Treatment Plant are summarized. The study is presented in terms of preliminary engineering design, economic analysis, institutional issues, environmental impacts, resource development, and system implementation.

  1. Phase 2 focused feasibility study report for the reduction of mercury in plant effluent project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-06-01

    The purpose of this focused feasibility study (FS) is to review the alternatives that have been evaluated under the Reduction of Mercury in Plant Effluent scoping efforts and provide justification for the recommended alternative. The chosen option from this study will be executed to meet the mercury-specific requirements of the recently negotiated National Pollutant Discharge Elimination System (NPDES) Permit for the Oak Ridge Y-12 Plant. Four previous ''mercury use'' buildings at the Y-12 Plant have been identified as primary contributors to these discharges and are scheduled to undergo upgrades to mitigate them as sources. They are 9201-2, 9201-4, 9201-5, and 9204-4. These buildings contain mercury-contaminated pipes and sumps that discharge to EFPC. The current requirements for limiting mercury discharges to EFPC are defined in the draft Y-12 Plant NPDES Permit, which is expected to become effective in July 1994. The main requirement related to mercury in the permit is to reduce the downstream mercury concentration to 5 g/day or less. Three basic options are considered and estimated in this study, including treatment at the building sources with local units (∼$3.8 million); a combination of local treatment and centralized treatment at the Central Pollution Control Facility (∼$6.6--8.9 million); and hydraulic control of the groundwater and/or in situ soil treatment (∼$120 million). As negotiated under the NPDES Permit, an ''interim'' local unit, utilizing carbon adsorption, is being placed in operation in the 9201-2 building by July 1994. Since the major uncertainties associated with meeting the NPDES permit discharge requirements for mercury are flow rates and treatment efficiency, the 9201-2 unit will provide within 6 months the data necessary to optimize a treatment design

  2. Feasibility Study for Cobalt Bundle Loading to CANDU Reactor Core

    International Nuclear Information System (INIS)

    Park, Donghwan; Kim, Youngae; Kim, Sungmin

    2016-01-01

    CANDU units are generally used to produce cobalt-60 at Bruce and Point Lepreau in Canada and Embalse in Argentina. China has started production of cobalt-60 using its CANDU 6 Qinshan Phase III nuclear power plant in 2009. For cobalt-60 production, the reactor’s full complement of stainless steel adjusters is replaced with neutronically equivalent cobalt-59 adjusters, which are essentially invisible to reactor operation. With its very high neutron flux and optimized fuel burn-up, the CANDU has a very high cobalt-60 production rate in a relatively short time. This makes CANDU an excellent vehicle for bulk cobalt-60 production. Several studies have been performed to produce cobalt-60 using adjuster rod at Wolsong nuclear power plant. This study proposed new concept for producing cobalt-60 and performed the feasibility study. Bundle typed cobalt loading concept is proposed and evaluated the feasibility to fuel management without physics and system design change. The requirement to load cobalt bundle to the core was considered and several channels are nominated. The production of cobalt-60 source is very depend on the flux level and burnup directly. But the neutron absorption characteristic of cobalt bundle is too high, so optimizing design study is needed in the future

  3. Feasibility Study for Cobalt Bundle Loading to CANDU Reactor Core

    Energy Technology Data Exchange (ETDEWEB)

    Park, Donghwan; Kim, Youngae; Kim, Sungmin [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    CANDU units are generally used to produce cobalt-60 at Bruce and Point Lepreau in Canada and Embalse in Argentina. China has started production of cobalt-60 using its CANDU 6 Qinshan Phase III nuclear power plant in 2009. For cobalt-60 production, the reactor’s full complement of stainless steel adjusters is replaced with neutronically equivalent cobalt-59 adjusters, which are essentially invisible to reactor operation. With its very high neutron flux and optimized fuel burn-up, the CANDU has a very high cobalt-60 production rate in a relatively short time. This makes CANDU an excellent vehicle for bulk cobalt-60 production. Several studies have been performed to produce cobalt-60 using adjuster rod at Wolsong nuclear power plant. This study proposed new concept for producing cobalt-60 and performed the feasibility study. Bundle typed cobalt loading concept is proposed and evaluated the feasibility to fuel management without physics and system design change. The requirement to load cobalt bundle to the core was considered and several channels are nominated. The production of cobalt-60 source is very depend on the flux level and burnup directly. But the neutron absorption characteristic of cobalt bundle is too high, so optimizing design study is needed in the future.

  4. Conceptual design of small-sized HTGR system (4). Plant design and technical feasibility

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Sato, Hiroyuki; Yan, Xing L.; Sumita, Junya; Nomoto, Yasunobu; Tazawa, Yujiro; Noguchi, Hiroki; Imai, Yoshiyuki; Tachibana, Yukio

    2013-09-01

    Japan Atomic Energy Agency (JAEA) has started a conceptual design of a 50MWt small-sized high temperature gas cooled reactor (HTGR) for steam supply and electricity generation (HTR50S), which is a first-of-kind of the commercial plant or a demonstration plant of a small-sized HTGR system for steam supply to the industries and district heating and electricity generation by a steam turbine, to deploy in developing countries in the 2020s. HTR50S was designed for steam supply and electricity generation by the steam turbine with the reactor outlet temperature of 750degC as a reference plant configuration. On the other hand, the intermediate heat exchanger (IHX) will be installed in the primary loop to demonstrate the electricity generation by the helium gas turbine and hydrogen production by thermochemical water splitting by utilizing the secondary helium loop with the reactor outlet temperature of 900degC as a future plant configuration. The plant design of HTR50S for the steam supply and electricity generation was performed based on the plant specification and the requirements for each system taking into account for the increase of the reactor outlet coolant temperature from 750degC to 900degC and the installation of IHX. The technical feasibility of HTR50S was confirmed because the designed systems (i.e., reactor internal components, reactor pressure vessel, vessel cooling system, shutdown cooling system, steam generator (SG), gas circulator, SG isolation and drainage system, reactor containment vessel, steam turbine and heat supply system) satisfies the design requirements. The conceptual plant layout was also determined. This paper provides the summary of the plan design and technical feasibility of HTR50S. (author)

  5. Feasibility study on Bobovdol thermal power plant upgrading project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons of fuel oil equivalent. In addition, the reduction rate of global warming gas emission is 57.75%, and the cumulative reduction quantity in 41 years is 105.18 million tons. (NEDO)

  6. Feasibility Study on HYSOL CSP

    DEFF Research Database (Denmark)

    Nielsen, Lars Henrik; Skytte, Klaus; Pérez, Cristian Hernán Cabrera

    2016-01-01

    Concentrating Solar Power (CSP) plants utilize thermal conversion of direct solar irradiation. A trough or tower configuration focuses solar radiation and heats up oil or molten salt that subsequently in high temperature heat exchangers generate steam for power generation. High temperature molten...... salt can be stored and the stored heat can thus increase the load factor and the usability for a CSP plant, e.g. to cover evening peak demand. In the HYSOL concept (HYbrid SOLar) such configuration is extended further to include a gas turbine fuelled by upgraded biogas or natural gas. The optimised...... integrated HYSOL concept, therefore, becomes a fully dispatchable (offering firm power) and fully renewable energy source (RES) based power supply alternative, offering CO2-free electricity in regions with sufficient solar resources. The economic feasibility of HYSOL configurations is addressed in this paper...

  7. Case study on the feasibility of small and medium nuclear power plants in Egypt

    International Nuclear Information System (INIS)

    1994-04-01

    The IAEA agreed to co-operate with the Arab Republic of Egypt in performing a case study on the feasibility of small and medium power reactors (SMPRs) as a technical assistance project. The major objective of this study is to examine the feasibility of SMPRs to supply a portion of the future electrical energy requirements in the long term power programme of Egypt. The IAEA is grateful to all who provided information and assisted in the drafting and review of the report, in particular to the Advisory Group which performed the study in a co-operative effort. It is hoped that the report will meet the interests of policy makers, managers, engineers and economists in Member States, particularly in developing countries, and that it will provide a useful basis for specific studies to prepare decisions on SMPR projects. Refs, figs and tabs

  8. Joint Feasibility study on the Instruction of a commercial FBR power plant to Korea between Korea and France

    International Nuclear Information System (INIS)

    Lee, Chang Kun; Cho, Mann; Juhn, Poong Eil; Nam, Jang Soo; Roh, Eun Rae; Yang, Chang Kook; Choi, Young Sang; Shin, Jae In; Chang, Young Nam; Kim, Hoa Gy; Lee, Hong Moon

    1985-03-01

    The objective of this joint feasibility study is to prepare for the implementation plan of the establishment of technological capability prior to the introduction of a commercial FBR power plant to Korea. The scope and contents of the second year project are as follows: Determined are the implementation activities in the two alternative FBR introduction scenarios i.e., a turnkey scenario and a gradual localization scenario with regard to the proportion of domestic participation. And FBR center is modeled as the construction of 4 units of 1,500 MWe LMFBR and related fuel cycle facilities such as reprocessing and fabrication plants at one site. In turnkey scenario, domestic implementation project is selected and the means to develop technical capability are classified into OJT/OJP, R and D, and technology transfer and the floating time schedule is made with reference to the first FBR operation year. In a gradual localization scenario Korean party's plan of means to develop technical capability is prepared. For the analysis of turnkey base introduction scenario project activities were extracted and analyzed referring to IAEA TR. 200 ''Manpower Development for Nuclear power Plant'', Guidebook (1980). And floating time schedule was prepared for the means to develop technical capability and project schedule. For the analysis of gradual localization scenario, project activities were derived under the assumption that entire facilities of FBR center should be localized. PWR's and FBR's fuel reprocessing facilities were incorporated in the reprocessing facility. (Author)

  9. Full system decontamination feasibility studies

    International Nuclear Information System (INIS)

    Denault, R.P.; LeSurf, J.E.; Walschot, F.W.

    1988-01-01

    Many chemical decontaminations have been performed on subsystems in light water reactors (BWRs and PWRs) but none on the full system (including the fuel) of large, (>500 MWe) investor owned reactors. Full system decontaminations on pressure-tubed reactors have been shown to facilitate maintenance, inspection, repair and replacement of reactor components. Further advantages are increased reactor availability and plant life extension. A conceptual study has been performed for EPRI (for PWRs) and Commonwealth Edison Co (for BWRs) into the applicability and cost benefit of full system decontaminations (FSD). The joint study showed that FSDs in both PWRs and BWRs, with or without the fuel included in the decontamination, are feasible and cost beneficial provided a large amount of work is to be done following the decontamination. The large amounts of radioactive waste generated can be managed using current technologies. Considerable improvements in waste handling, and consequent cost savings, can be obtained if new techniques which are now reaching commercial application are used. (author)

  10. Models for the location decision for a combined cycle power plant : basic principles for solving the decision problem of the choice of location for a feasibility study of gas-fired power plants

    OpenAIRE

    Krüger, Jan

    2015-01-01

    The present thesis deals with the foundations for solving the decision problem of site selection for a feasibility study of gas-fired power plants, based on realistic and practical statements, under a business approach. The analysis of different theories and the investigation of site-relevant decision criteria has illustrated the broad range of site-specific factors and criteria that are to be taken into account. On the basis of existing projects, in which site theories were analysed for vari...

  11. Plant systems/components modularization study. Final report. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    1977-07-01

    The final results are summarized of a Plant Systems/Components Modularization Study based on Stone and Webster's Pressurized Water Reactor Reference Design. The program has been modified to include evaluation of the most promising areas for modular consideration based on the level of the Sundesert Project engineering design completion and the feasibility of their incorporation into the plant construction effort.

  12. ARAC feasibility study for the NRC Phase I: final report

    International Nuclear Information System (INIS)

    Rosen, L.C.; Orphan, R.C.

    1979-11-01

    The feasibility of implementing ARAC (Atmospheric Release Advisory Capability) services in a particular nuclear power plant is examined. The criteria for selecting Rancho Seco are discussed and the physical, meteorological and procedural factors related to the plant are assessed. The potential benefits and limitations of implementing ARAC at Rancho Seco are analyzed. The costs of employing the system at the nuclear power plant are given for alternative plans. A training and familiarization program is outlined

  13. Feasibility study of upgrading Byllesby and Buck power plants on the New River in the Commonwealth of Virginia

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    The feasibility of upgrading alternatives of the 66-year-old Byllesby and Buck hydroelectric developments located on the New River in Virginia was investigated. Evaluation of technical, economic and environmental factors led to the conclusion that modernization of the plants could result in an annual generation increase of 20.2 GWh at a cost of $6.1 million and with a benefit-cost ratio of 2.32. The recommended retrofitting includes replacing existing runners with new, more efficiently designed runners, modifying draft tube and wicker gate, and rewinding the generators. (LCL)

  14. Environmental feasibility study for deployment and construction of mobile gas turbine power plants in urbanized areas

    Directory of Open Access Journals (Sweden)

    Bryukhan Fedor

    2017-01-01

    Full Text Available In the view of current electrical shortage in some regions of Russia, mobile gas turbine power plants (MGTPP have become urgent in recent years. Usually they are used as back-up power sources to cover peak loads in power networks and to ensure uninterrupted power supply to consumers. This paper deals with environmental feasibility study for deployment and construction of the MGTPP in an urban setting. Technogehic factors of the MGTPP impact on the environment have been assessed and possibility of the MGTPP deployment at various sites in different regions of Russia has been identified. The necessity of using the technology of water injection into the gas turbine units combustion chamber to suppress nitrogen oxides in some cases is mentioned. Quantitative assessments of the MGTPP technogehic impact on the environment components have been performed using standard techniques. The calculations have revealed that the MGTPP specifications ensure the levels of technogehic impacts within the standard limits. The results have ensured preparation of pre-design and design documentation related to protection of the environment against the MGTPP complex technogehic impact.

  15. Feasibility study on floating nuclear power plant (1). Conceptual design study of FNPP. Contract research

    International Nuclear Information System (INIS)

    Yabuuchi, Noriaki; Shimazaki, Junya; Ochiai, Masaaki; Takahashi, Masao; Nakazawa, Toshio

    2001-02-01

    Offshore siting methods for a nuclear power plant are classified into three types as a floating type, a settled type and a land reclamation type. The floating nuclear power plant (FNPP) has a number of advantages, such as seismic isolation, standardization of design and manufacturing, and reduction of construction period. It is, however, required for FNPP to establish the safety standards, which are different from ones for land based nuclear power plant. Investigations for this subject have not been conducted sufficiently. In this report, design study on a concept for FNPP and a review on stability evaluation for the floating platform, which were performed in order to study the safety concept of the FNPP are described. The basic concept of the FNPP are described. The basic concept for FNPP is as follows: The FNPP is sited approximately 1 - 2km off the sea coast on the open sea with water depth of about 20m and it is moored of protected sea by the breakwater, it provide a floating platform for a 1,100MWe class PWR plant. The results of design study show that the floating platform for 1,100MWe class PWR plant of 300m (L) x 80m (W) x 35m (H), and displacement of approximately 300,000 ton can be constructed in a dockyard. This floating platform guarded by the breakwater is found to be stable enough to install the nuclear power plant from the analysis simulating the movement of the platform due to sea wave or wind. (author)

  16. Feasibility study on floating nuclear power plant (1). Conceptual design study of FNPP. Construct research

    Energy Technology Data Exchange (ETDEWEB)

    Yabuuchi, Noriaki; Shimazaki, Junya; Ochiai, Masaaki [Department of Nuclear Energy System, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai, Ibaraki (Japan); Takahashi, Masao [Niigata Engineering Co. Ltd., Tokyo (Japan); Nakazawa, Toshio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Sato, Kazuo [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan)

    2001-02-01

    Offshore siting methods for a nuclear power plant are classified into three types as a floating type, a settled type and a land reclamation type. The floating nuclear power plant (FNPP) has a number of advantages, such as seismic isolation, standardization of design and manufacturing, and reduction of construction period. It is, however, required for FNPP to establish the safety standards, which are different from ones for land based nuclear power plant. Investigations for this subject have not been conducted sufficiently. In this report, design study on a concept for FNPP and a review on stability evaluation for the floating platform, which were performed in order to study the safety concept of the FNPP are described. The basic concept of the FNPP are described. The basic concept for FNPP is as follows: The FNPP is sited approximately 1 - 2km off the sea coast on the open sea with water depth of about 20m and it is moored of protected sea by the breakwater, it provide a floating platform for a 1,100MWe class PWR plant. The results of design study show that the floating platform for 1,100MWe class PWR plant of 300m (L) x 80m (W) x 35m (H), and displacement of approximately 300,000 ton can be constructed in a dockyard. This floating platform guarded by the breakwater is found to be stable enough to install the nuclear power plant from the analysis simulating the movement of the platform due to sea wave or wind. (author)

  17. Feasibility study for Tashkent Heat and Power Plant Modernizing Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was carried out of the project for energy conservation and greenhouse effect gas emission reduction by introducing the newest and most powerful gas turbine cogeneration facilities to the Tashkent cogeneration plant in Uzbekistan. At the Tashkent cogeneration plant, each of the facilities is being superannuated, which leads to lowering of operational reliability and increase in cost of repairs. In the project, studied was the introduction of the newest and most powerful gas turbine cogeneration facilities with heat output of 100 Gcal/h equivalent to that of one can of the existing hot water boiler and with generated output of 80MW. As a result of the study, obtained were the energy conservation amount of 83.9 ktoe/y and the greenhouse effect gas reduction amount of 179.7 kt-CO2/y. The initial investment amount was 10.003 billion yen. Expenses vs. effects were 8.39 toe/y-million yen in energy conservation amount and 18.0 t-CO2/y-million yen in greenhouse effect gas reduction amount. In the study of profitability, the internal earning rate was 9.24% after tax, the return yield of capital was 41.26%, and the period of ROI was 16.9 years. (NEDO)

  18. Feasibility study on phyto-remediation techniques for soil contaminated by the Fukushima Dai-Ichi nuclear power plant accident

    Energy Technology Data Exchange (ETDEWEB)

    Yuu Ishimori; Akihiro Sakoda [Japan Atomic Energy Agency, Kagamino, Okayama (Japan); Mina Yamada; Yuko Makino; Satoshi Yamada; Hideyasu Fujiyama [Tottori University, Tottori, Tottori (Japan)

    2013-07-01

    Tottori University and the Japan Atomic Energy Agency carried out jointly the feasibility study on phyto-remediation techniques, which apply to soil contaminated by the TEPCO's Fukushima Dai-ichi NPP accident. This paper illustrates the results from experimental investigations. Experimental investigations include both water-culture tests and field tests. Several plants, mainly halophytes that can specifically absorb more Na than K, and others like sunflower demonstrated for other domestic large-scale tests, were water-cultured and examined for screening. Easily cultivated and harvested plants without harmful effects on subsequent cultivation were also considered. New Zealand spinach was selected as a candidate for demonstrations in fields. The field tests were carried out at two sites of different agricultural types in Minami-soma, Fukushima prefecture. Concentration of {sup 137}Cs in soil is about 4.5 Bq/g-dry as the average of 10 cm depth. The aims of the field tests are to confirm absorption ability and environmental adaptation of the test plants and to document the cost and performance of projects. In conclusion, the absorption of {sup 137}Cs activity per unit area (Bq/m{sup 2}) by New Zealand spinach could be approximately 0.5%. To achieve an effective result in removal of {sup 137}Cs from soil in around a decade, it is required to find the plant which has ten or more times higher absorption capacity than New Zealand spinach. From the consistency of both results in water-culture and field tests, the water-culture test can be valid for screening. In addition, applicable sites will be limited to fields which are too steep or too narrow to use mechanical diggers, and which are free from any restrictions to enter. (authors)

  19. Feasibility study on the acquisition of licensee event data

    International Nuclear Information System (INIS)

    Kato, W.Y.; Hall, R.E.; Teichmann, T.; Taylor, J.; Luckas, W.J. Jr.; Saha, P.; Samanta, P.; Fragola, J.

    1983-01-01

    Objective of the study was to assess the feasibility of modifying the LER reporting system as proposed by NRC-AEOD, and/or developing an alternative plan that would in addition collect information about significant events amenable to statistical analysis, such as multi-case, multi-variate analysis. The study indicated that the LERs constitute reports from a large variety of events which have in most cases many different plant parameters, both measured and currently not measured, to characterize the event. In order to determine event-specific plant parameters required for statistical and deterministic analysis, a data matrix approach was used to identify those parameters which are currently being recorded, those which could be measured and recorded, and those which are required for certain types of events involving thermal-hydraulics and neutronics as illustrative of events requiring in-depth analysis. Also included in the study was a review of INPO's Nuclear Plant Reliability Data System; NASA's Problem Reporting and Corrective Action (PRACA) program; Electricite de France's KIT system, an automatic computer-based reactor parameter monitoring and recording system; and the regulatory relationship between the FAA and the commercial airline industry

  20. Feasibility study for core protection calculator development

    International Nuclear Information System (INIS)

    In, W. K.; Han, J. B.

    2003-06-01

    This project confirmed the development feasibility of new digital core protection system and established development plan for ITOPS that can replace the CPC system. The development plan and implementation strategy for ITOPS proposed in this project will be useful to successfully develop advanced digital core protection system for the CPC replacement in KSNP plants. YGN units 3 and 4 are expected to replace the CPC system within next ten years and the other KSNP plants are followed. The localization model for advanced digital core protection system, ITOPS, is judged to upgrade the Common Q CPC system in both system configuration and algorithm performance and can reduce the cost for supply and maintenance. Hence, ITOPS is expected to be installed in new Korea nuclear power plants and also useful to export the associated technology in the future

  1. Recent progress in the feasibility study for the first nuclear power plant in Indonesia

    International Nuclear Information System (INIS)

    Adiwardojo

    1997-01-01

    The energy consumption in Indonesia has been continually increasing since 1970 at an average rate of ∼ 10.6%/year. Specifically, for the island of Java, which consumes ∼ 80% of Indonesia's electricity, the installed capacity by PLN was 6363MW in 1990/91. This has increased by ∼ 17%/year during the past three years. Additional increase in electrical consumption of the Java-Bali system projects the need for the installed capacity to reach 31,845 MW in 2003/04. In anticipation of this major addition of installed capacity, the government of Indonesia is conducting feasibility studies of the nuclear option as a means of filling the projected deficit or gap where other fuel options are likely to reach their limits. This paper describes the scope of the present feasibility study including energy economics and financing, technical and safety aspects, the fuel cycle and waste management, general management, and site and environmental studies. (author). 4 refs, 1 fig., 4 tabs

  2. Pre-feasibility study of 80mw onshore wind farm

    International Nuclear Information System (INIS)

    Almas, M.S.

    2014-01-01

    This paper discusses a pre-feasibility study of 80MW onshore wind farm in the KPK (Khyber Pakhtunkhwa) province previously known as NWFP (North West Frontier) Province of Pakistan. The realistic data of wind speed is collected from Laboratory of Meteorology and Climatology (University of the Punjab) to study the feasibility of wind farm. Detailed analysis of wind turbines from four different manufacturers is carried out together with justifications of selecting a particular wind turbine. Issues related to site selection, wind farm civil foundation, recommendations for a particular choice of tower along with environmental effects are presented. Wind data analysis is carried out by using WINDROSE PRO software to determine the resultant direction of wind at the selected site for wind farm layout. The wind distribution at hub height of the wind turbine is calculated and is used to compute annual power production by the wind farm using power curves of the wind turbine. Electrical network integration issues of wind farm to the external grid are studied and the optimum point of connection is proposed. Finally, economic analysis of the whole wind farm project depending upon the LCC (Life Cycle Cost Analysis) is presented and the feasibility of the project from the investor's point of view is identified. The study concludes that the cost per kilowatt hour of electricity generated by this wind power plant will be 10.4 PKR/kWh and the payback period for the whole project is about 11.2 years. (author)

  3. Feasibility study of Pridneprovskaya Thermal Power Plant reconstruction project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  4. A feasible approach to implement a commercial scale CANDU fuel manufacturing plant in Egypt

    International Nuclear Information System (INIS)

    El-Shehawy, I.; El-Sharaky, M.; Yasso, K.; Selim, I.; Graham, N.; Newington, D.

    1995-01-01

    Many planning scenarios have been examined to assess and evaluate the economic estimates for implementing a commercial scale CANDU fuel manufacturing plant in Egypt. The cost estimates indicated strong influence of the annual capital costs on total fuel manufacturing cost; this is particularly evident in a small initial plant where the proposed design output is only sufficient to supply reload fuel for a single CANDU-6 reactor. A modular approach is investigated as a possible way, to reduce the capital costs for a small initial fuel plant. In this approach the plant would do fuel assembly operations only and the remainder of a plant would be constructed and equipped in the stages when high production volumes can justify the capital expenses. Such approach seems economically feasible for implementing a small scale CANDU fuel manufacturing plant in developing countries such as Egypt and further improvement could be achieved over the years of operation. (author)

  5. Feasibility study for the processing of Hanford Site cesium and strontium isotopic sources in the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    Anantatmula, R.P.; Watrous, R.A.; Nelson, J.L.; Perez, J.M.; Peters, R.D.; Peterson, M.E.

    1991-09-01

    The final environmental impact statement for the disposal of defense-related wastes at the Hanford Site (Final Environmental Impact Statement: Disposal of Hanford Defense High-Level, Transuranic and Tank Wastes [HDW-EIS] [DOE 1987]) states that the preferred alternative for disposal of cesium and strontium wastes at the Hanford Site will be to package and ship these wastes to the commercial high-level waste repository. The Record of Decision for this EIS states that before shipment to a geologic repository, these wastes will be packaged in accordance with repository waste acceptance criteria. However, the high cost per canister for repository disposal and uncertainty about the acceptability of overpacked capsules by the repository suggest that additional alternative means of disposal be considered. Vitrification of the cesium and strontium salts in the Hanford Waste Vitrification Plant (HWVP) has been identified as a possible alternative to overpacking. Subsequently, Westinghouse Hanford Company's (Westinghouse Hanford) Projects Technical Support Office undertook a feasibility study to determine if any significant technical issues preclude the vitrification of the cesium and strontium salts. Based on the information presented in this report, it is considered technically feasible to blend the cesium chloride and strontium fluoride salts with neutralized current acid waste (NCAW) and/or complexant concentrate (CC) waste feedstreams, or to blend the salts with fresh frit and process the waste through the HWVP

  6. Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Schey

    2009-07-01

    Cooperative Agreement DE-FC07-06ID14788 was executed between the U.S. Department of Energy, Electric Transportation Applications, and Idaho National Laboratory to investigate the economics of producing hydrogen by electrolysis using electricity generated by nuclear power. The work under this agreement is divided into the following four tasks: Task 1 – Produce Data and Analyses Task 2 – Economic Analysis of Large-Scale Alkaline Electrolysis Task 3 – Commercial-Scale Hydrogen Production Task 4 – Disseminate Data and Analyses. Reports exist on the prospect that utility companies may benefit from having the option to produce electricity or produce hydrogen, depending on market conditions for both. This study advances that discussion in the affirmative by providing data and suggesting further areas of study. While some reports have identified issues related to licensing hydrogen plants with nuclear plants, this study provides more specifics and could be a resource guide for further study and clarifications. At the same time, this report identifies other area of risks and uncertainties associated with hydrogen production on this scale. Suggestions for further study in some of these topics, including water availability, are included in the report. The goals and objectives of the original project description have been met. Lack of industry design for proton exchange membrane electrolysis hydrogen production facilities of this magnitude was a roadblock for a significant period. However, recent design breakthroughs have made costing this facility much more accurate. In fact, the new design information on proton exchange membrane electrolyzers scaled to the 1 kg of hydrogen per second electrolyzer reduced the model costs from $500 to $100 million. Task 1 was delayed when the original electrolyzer failed at the end of its economic life. However, additional valuable information was obtained when the new electrolyzer was installed. Products developed during this study

  7. Feasibility of evacuation

    International Nuclear Information System (INIS)

    1988-01-01

    The main question is whether evacuation of people is feasible in case of accidents with a nuclear power plant. The limiting conditions of this question are extracted from other studies. This study is therefore focused on a postulated accident in a newly built nuclear power plant with an electric capacity of 1000 Megawatt and a source term of one percent. In this particular case an evacuation should take place within the period between the accident and the emission of nuclear materials. Initial focus is on the administrative-organizational aspects of evacuation. Then bottlenecks in the technical implementation of evacuation are determined. An analysis is made for each potential Dutch location (Borssele, Eemshaven, Maasvlakte, Moerdijk and Westelijke Noordoostpolderdijk) of a nuclear power plant. By means of a model the following question is examined: can the population leave the danger area or be evacuated on time, under certain circumstances. It is concluded that preventive evacuation of the population from the planned locations is feasible, but at Moerdijk complications may occur because of the presence of some homes for the elderly and a nursing home. 18 refs.; 7 figs.; 2 tabs

  8. Power plant conceptual studies in Europe

    International Nuclear Information System (INIS)

    Maisonnier, D.; Campbell, D.; Cook, I.; Pace, L. Di; Giancarli, L.; Hayward, J.; Puma, A. Li; Medrano, M.; Norajitra, P.; Roccella, M.; Sardain, P.; Tran, M.Q.; Ward, D.

    2007-01-01

    The European fusion programme is 'reactor oriented' and it is aimed at the successive demonstration of the scientific, the technological and the economic feasibility of fusion power. The European Power Plant Conceptual Study (PPCS) has been a study of conceptual designs of five commercial fusion power plants and the main emphasis was on system integration. It focused on five power plant models which are illustrative of a wider spectrum of possibilities. They are all based on the tokamak concept and they have approximately the same net electrical power output, 1500 MWe. These span a range from relatively near-term, based on limited technology and plasma physics extrapolations, to an advanced conception. The PPCS allows one to clarify the concept of DEMO, the device that will bridge the gap between ITER and the first-of-a-kind fusion power plant. An assessment of the PPCS models with limited extrapolations highlighted a number of issues that must be addressed to establish the DEMO physics and technological basis

  9. Feasibility of quantitative performance measures for evaluating nuclear power plant operators

    International Nuclear Information System (INIS)

    Carter, R.J.; Connelly, E.M.; Krois, P.A.

    1989-01-01

    A more valid measure of team performance in nuclear power plants is needed. A study is described which was oriented towards evaluating the feasibility of synthesizing performance measures by deriving measures for crews responding to an off-normal event in a full-scope simulator. The thesis was that performance assessment is based on the subjective judgment of training instructors. The procedure used to synthesize the performance measure consisted of: identification of the factors believed to be important to performance assessment, development of example crew performances and ratings on each by instructors, and derivation of the measure by capturing the instructors' assessment rules. A performance measure was derived which explains nearly all of the variance of the instructors' team performance assessments. There is reason to believe that this method of synthesizing measures can be applied to other events. 7 tabs

  10. Feasibility of risk-informed technology for japanese nuclear power plants

    International Nuclear Information System (INIS)

    Yoshida, Tomoo; Fujioka, Terutaka; Kirimoto, Yorihiro; Ueda, Nobuyuki; Kinoshita, Izumi; Kashima, Koichi

    2000-01-01

    Risk-informed technology utilizes Probabilistic Safety Assessment for streamlining the maintenance of nuclear power plants. With this technology, plant components are categorized as either high or low-safety-significant components. The Maintenance requirements focuses on high safety-significant components and are relieved for low safety significant ones. This is expected to reduce plant cost while maintaining safety. We investigated especially risk-informed inservice inspection of piping in U.S. nuclear power plants in the interest of determining its feasibility for Japanese plants. Quantitative and qualitative RI-ISI methods were developed by the ASME/Westinghouse Owners Group and EPRI, respectively. These methods have been incorporated in the ASME Section 11 Code Cases and endorsed by the U.S. Nuclear Regulatory Commission. The quantitative method evaluates component segment risks in terms of pipe failure probability calculated with a probabilistic fracture mechanics(PFM) model and pipe failure impact categorization on core damage frequency(CDF) calculated with PSA. The qualitative method uses pipe failure potential categorization derived from the plant service experiences and pipe failure impact on CDF derived from the PSA insight. The PFM model is applicable only to failures from initial welding defects and stress corrosion cracking, therefore it does not cover such significant failure mechanisms found in nuclear power plants as corrosion or high-cycle fatigue, etc.. Thus, a qualitative failure potential categorization method was developed on the basis of the service experiences of the U.S. nuclear power plants, so that appropriate categorization rules must be developed on the service experiences in Japanese plants. Accordingly, we have devised a software framework with a computer-aided system for the selection of risk significant elements. This system consists of a piping failure database module, a piping failure analysis module, and a piping failure potential

  11. Harvest for health gardening intervention feasibility study in cancer survivors.

    Science.gov (United States)

    Blair, Cindy K; Madan-Swain, Avi; Locher, Julie L; Desmond, Renee A; de Los Santos, Jennifer; Affuso, Olivia; Glover, Tony; Smith, Kerry; Carley, Joseph; Lipsitz, Mindy; Sharma, Ayushe; Krontiras, Helen; Cantor, Alan; Demark-Wahnefried, Wendy

    2013-08-01

    Cancer survivors are at increased risk for second malignancies, cardiovascular disease, diabetes, and functional decline. Evidence suggests that a healthful diet and physical activity may reduce the risk of chronic disease and improve health in this population. We conducted a feasibility study to evaluate a vegetable gardening intervention that paired 12 adult and child cancer survivors with Master Gardeners to explore effects on fruit and vegetable intake, physical activity, quality-of-life, and physical function. Throughout the year-long study period, the survivor-Master Gardener dyads worked together to plan/plant three gardens, harvest/rotate plantings, and troubleshoot/correct problems. Data on diet, physical activity, and quality-of-life were collected via surveys; anthropometrics and physical function were objectively measured. Acceptability of the intervention was assessed with a structured debriefing survey. The gardening intervention was feasible (robust enrollment; minimal attrition) and well-received by cancer survivors and Master Gardeners. Improvement in three of four objective measures of strength, agility, and endurance was observed in 90% of survivors, with the following change scores [median (interquartile range)] noted between baseline and one-year follow-up: hand grip test [+ 4.8 (3.0, 6.7) kg], 2.44 meter Get-Up-and-Go [+ 1.0 (+ 1.8, + 0.2) seconds], 30-second chair stand [+ 3.0 (+ 1.0, 5.0) stands], and six-minute walk [+ 11.6 (6.1, 48.8) meters]. Increases of ≥ 1 fruit and vegetable serving/day and ≥ 30 minutes/week of physical activity were observed in 40% and 60%, respectively. These preliminary results support the feasibility and acceptability of a mentored gardening intervention and suggest that it may offer a novel and promising strategy to improve fruit and vegetable consumption, physical activity, and physical function in cancer survivors. A larger randomized controlled trial is needed to confirm our results.

  12. Northern gas: Williams petrochemical feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Chappell, D. [Williams Energy Canada, Calgary, AB (Canada)

    2002-07-01

    Williams Energy is a company that is involved in the following fields: gas pipelines, exploration and production, midstream, refining, petrochemical, power, and marketing and trading. The author provides an overview of the global and Canadian infrastructure before proceeding to discuss Arctic gas, which is viewed by Williams Energy as necessary. It favors the Alaska Highway route with a consortium for project development. Williams performed a petrochemical study to determine the feasibility of a petrochemical complex utilizing natural gas liquid from an Arctic gas pipeline. The scope of the study encompassed facilities (extraction plant, cracker, polyolefins plant), size (world scale, approximately 2 billion pounds per year), and location (Fairbanks or Alberta). The study led to the following findings: (1) review of several scenarios for both locations, (2) complex to produce two grades of polyethylene, (3) feedstock cost favors Alaska, (4) construction costs lower in Alberta, (5) and the primary market for the Alaska complex would be northeast Asia, while the primary market for the Alberta location would be the United States. It was determined that both options would be viable, however Alberta was favored due to the polyethylene forecast. The challenges still being faced by Williams include low frac spread, market inefficiencies, empress volumes, carbon dioxide, and fuel and electricity cost. Each of these challenges is discussed separately. The author concludes by indicating that incremental ethane is available, carbon dioxide issues need resolution, and Alberta and Alaska are attractive for Arctic ethane petrochemical production. figs.

  13. Unified modeling and feasibility study of novel green pathway of biomass to methanol/dimethylether

    International Nuclear Information System (INIS)

    Ravaghi-Ardebili, Zohreh; Manenti, Flavio

    2015-01-01

    Graphical abstract: Biomass-to-methanol/DME synthesis process layout. - Highlights: • Design, simulation, and control of the direct-storage concentrating solar plant. • Feasibility study of the low-temperature biomass gasification. • First-principles model of biomass gasifier. • First-principles model of one-step methanol/dimethylether synthesis reactor. • Integrated numerical platform for total plant simulation. - Abstract: A novel, integrated and unified process is proposed, modeled and studied for converting biomass to methanol (MeOH)/dimethylether (DME) to demonstrate its feasibility and applicability for the global industrial sector. The unified process consists of a concentrating solar power (CSP) plant, which supplies the produced steam to the biomass gasification process as well as to the downstream conversions to chemical commodities and energy carriers. To preserve the effectiveness of the biomass gasification with low-temperature solar-powered generated steam (approximately 400–410 °C), the gasification process is studied by means of a multi-complex (multi-scale, multi-phase, and multi-component) model and adapted to the novel proposed conditions. The syngas generated in the biomass gasification unit is then converted into MeOH/DME by means of one-step synthesis technology to improve the overall yield of the biomass-to-methanol process

  14. Pre-Feasibility Study of 80MW Onshore Wind Farm

    Directory of Open Access Journals (Sweden)

    Muhammad Shoaib Almas

    2014-10-01

    Full Text Available This paper discusses a pre-feasibility study of 80MW onshore wind farm in the KPK (Khyber Pakhtunkhwa province previously known as NWFP (North West Frontier Province of Pakistan. The realistic data of wind speed is collected from Laboratory of Meteorology & Climatology (University of the Punjab to study the feasibility of wind farm. Detailed analysis of wind turbines from four different manufacturers is carried out together with justifications of selecting a particular wind turbine. Issues related to site selection, wind farm civil foundation, recommendations for a particular choice of tower along with environmental effects are presented. Wind data analysis is carried out by using WINDROSE PRO software to determine the resultant direction of wind at the selected site for wind farm layout. The wind distribution at hub height of the wind turbine is calculated and is used to compute annual power production by the wind farm using power curves of the wind turbine. Electrical network integration issues of wind farm to the external grid are studied and the optimum point of connection is proposed. Finally, economic analysis of the whole wind farm project depending upon the LCC (Life Cycle Cost Analysis is presented and the feasibility of the project from the investor?s point of view is identified. The study concludes that the cost per kilowatt hour of electricity generated by this wind power plant will be 10.4 PKR/kWh and the payback period for the whole project is about 11.2 years

  15. Feasibility Assessment of Using Power Plant Waste Heat in Large Scale Horticulture Facility Energy Supply Systems

    Directory of Open Access Journals (Sweden)

    Min Gyung Yu

    2016-02-01

    Full Text Available Recently, the Korean government has been carrying out projects to construct several large scale horticulture facilities. However, it is difficult for an energy supply to operate stably and economically with only a conventional fossil fuel boiler system. For this reason, several unused energy sources have become attractive and it was found that power plant waste heat has the greatest potential for application in this scenario. In this study, we performed a feasibility assessment of power plant waste heat as an energy source for horticulture facilities. As a result, it was confirmed that there was a sufficient amount of energy potential for the use of waste heat to supply energy to the assumed area. In Dangjin, an horticultural area of 500 ha could be constructed by utilizing 20% of the energy reserves. In Hadong, a horticulture facility can be set up to be 260 ha with 7.4% of the energy reserves. In Youngdong, an assumed area of 65 ha could be built utilizing about 19% of the energy reserves. Furthermore, the payback period was calculated in order to evaluate the economic feasibility compared with a conventional system. The initial investment costs can be recovered by the approximately 83% reduction in the annual operating costs.

  16. Economic feasibility of heat supply from simple and safe nuclear plants

    International Nuclear Information System (INIS)

    Tian, J.

    2001-01-01

    Use of nuclear energy as a heating source is greatly challenged by the economic factor since the nuclear heating reactors have relative small size and often the lower plant load factor. However, use of very simple reactor could be a possible way to economically supply heat. A deep pool reactor (DPR) has been designed for this purpose. The DPR is a novel design of pool type reactor for heat only supply. The reactor core is put in a deep pool. By only putting light static water pressure on the core coolant, the DPR will be able to meet the temperature requirements of heat supply for district heating. The feature of simplicity and safety of DPR makes a decrease of investment cost compared to other reactors for heating only purposes. According to the economical assessments, the capital investment to build a DPR plant is much less than that of a pressurized reactor with pressure vessels. For the DPR with 120 or 200 MW output, it can bear the economical comparison with a usual coal-fired heating plant. Some special means taken in DPR design make an increase of the burn-up level of spent fuel and a decrease of fuel cost. The feasibility studies of DPR in some cities in China show that heating cost using nuclear energy is only one third of that by coal and only one tenth of that by nature gas. Therefore, the DPR nuclear heating system provides an economically attractive solution to satisfy the demands of district heating without contributing to increasing greenhouse gas emissions

  17. Analysis Of Investment Feasibility Of Batching Plant Development In Tanjung Redeb Talisayan Highway Km 102 In Biatan District Berau Regency

    Directory of Open Access Journals (Sweden)

    Ali Rosit

    2017-12-01

    Full Text Available This research is a feasibility study of Batching Plant development on Tanjung Redeb - Talisayan Highway Km 102 Biatan District Berau Regency which aims to know whether the development project can be built in terms of technical and economic aspects and to analyze the sensitivity with 3 types of economic situation. The data from this field study are analyzed using Present Value Net Present Value NPV Internal Rate of Return IRR Benefit Cost Ratio BCR and Payback Periods PBP. The results of the analysis show that Batching Plant Development on Tanjung Redeb Talisayan Highway Km 102 in Biatan District Berau Regency is quite feasible to be implemented with the assumption of 10 years investment period. Based on the calculation of Net Present Value NPV of IDR 11.499.703.942 positive Internal Rate of Return 1727 12 Benefit Cost Ratio 2309 1 with Payback Period is 5 years 7 months from the sensitivity analysis results the condition of the initial investment cost rate run up reaches to 127 the state of interest rates rose to 1454 due to uncertainty in the national and international economies and the circumstances when cash flows fell as a result of the decrease in revenues to 1684 where the circumstances state that the project which is about to be affected is not feasible or break event.

  18. Canadian small-scale hydroelectric plant manual: Quebec region, feasibility study for domestic installations. Manuel canadien de centrale hydroelectrique a faible puissance: Region du Quebec, etude de faisabilite pour installations domestiques

    Energy Technology Data Exchange (ETDEWEB)

    Proulx, S; Tung, T

    1989-11-01

    A manual is presented for evaluating the feasibility of domestic-scale hydropower plants, with reference to Quebec conditions. Procedures are given for determining energy needs, and the flow conditions and electricity generating potential of a site. The laws which regulate small hydro plants in Quebec are outlined. The types of turbines and associated electrical equipment are discussed, along with criteria for their selection according to application. The economic analysis of a proposed project is then described, and a list of documents which need to be prepared is included, as well as a glossary. A case study of a 50-kW plant installed at a Quebec restaurant is illustrated. 6 refs., 24 figs., 1 tab.

  19. Power-to-Gas coupling to biomethane production. A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Saric, M.; Dijkstra, J.W.; Walspurger, S. [ECN Biomass and Energy Efficiency, Petten (Netherlands)

    2013-09-15

    This preliminary feasibility study on coupling 'Power-to-gas' conversion chain to the bio-methane from producer gas shows a promising potential for efficient and cost effective operation. The production capacity of the biomethane plant can be doubled, while cold gas efficiency remains the same as compared to a standalone biomethane plant. The specifications of the natural gas grid can be reached at the condition that the allowed H2 content is not too strict. The study showed that such coupling implies that both methanation and SNG upgrade sections need to be designed to withstand variable operation conditions and part-load. The methanation section would have to deal with a turndown factor of 2 when switching from E-demand to E-excess operating mode while the CO2 removal section must work efficiently in part-load and respond well in shutdown/start-up operations.

  20. Economic feasibility constraints for renewable energy source power production

    International Nuclear Information System (INIS)

    Biondi, L.

    1992-01-01

    Suitable analysis criteria for use in economic feasibility studies of renewable energy source power plants are examined for various plant types, e.g., pumped storage hydroelectric, geothermal, wind, solar, refuse-fuelled, etc. The paper focusses on the impacts, on operating cost and rate structure, of the necessity, depending on demand characteristics, to integrate renewable energy source power production with conventional power production in order to effectively and economically meet peak power demand. The influence of commercialization and marketing trends on renewable energy source power plant economic feasibility are also taken into consideration

  1. A feasibility study on nuclear power options in Mongolia

    International Nuclear Information System (INIS)

    Minato, A.; Sekimoto, H.; Amartaivan, T.

    2010-10-01

    There is a growing interest among utilities in the United States in small and medium reactors due primarily to the smaller investment and perhaps shorter construction time involved as compared to those large reactors. The potential market for small reactors (those below 300 M We) exists, specially with sizes of 50 and 100 M We. A feasibility study was conducted on nuclear power options for Ulaanbaatar, Mongolia, a country which has a potential market for small reactors. The study was focused on an optimization of a combination of coal-fired and nuclear power plants taking into account Mongolia's future nuclear program plan, future population and economic growth, and the increased electricity and district heating demands. (Author)

  2. Techno-Economic Feasibility Study of Renewable Power Systems for a Small-Scale Plasma-Assisted Nitric Acid Plant in Africa

    Directory of Open Access Journals (Sweden)

    Aikaterini Anastasopoulou

    2016-12-01

    Full Text Available The expected world population growth by 2050 is likely to pose great challenges in the global food demand and, in turn, in the fertilizer consumption. The Food and Agricultural Organization of the United Nations has forecasted that 46% of this projected growth will be attributed to Africa. This, in turn, raises further concerns about the sustainability of Africa’s contemporary fertilizer production, considering also its high dependence on fertilizer imports. Based on these facts, a novel “green” route for the synthesis of fertilizers has been considered in the context of the African agriculture by means of plasma technology. More precisely, a techno-economic feasibility study has been conducted for a small-scale plasma-assisted nitric acid plant located in Kenya and South Africa with respect to the electricity provision by renewable energy sources. In this study, standalone solar and wind power systems, as well as a hybrid system, have been assessed for two different electricity loads against certain economic criteria. The relevant simulations have been carried out in HOMER software and the optimized configurations of each examined renewable power system are presented in this study.

  3. Sault Tribe Wind Energy Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Toni Osterhout; Global Energy Concepts

    2005-07-31

    The Sault Tribe conducted a feasibility study on tribal lands in the Upper Peninsula of Michigan to determine the technical and economic feasibility of both small and large-scale wind power development on tribal lands. The study included a wind resource assessment, transmission system analysis, engineering and regulatory analyzes and assessments.

  4. Feasibility Study on Manufacturing Lightweight Aggregates from Water Purification Sludge

    Science.gov (United States)

    Peng, Ching-Fang; Chen, How-Ji

    2018-02-01

    This study mainly discussed the feasibility of manufacturing lightweight aggregates from water purification sludge in Taiwan. They were analysed for the physical and chemical composition before the sintering test for lightweight aggregates in a laboratory. Then the physical and mechanical properties of the synthesized aggregates were assessed. The result showed that the chemical composition of sludge in the water purification plants was within the appropriate range for manufacturing lightweight aggregate as proposed in the literature. The sintering test demonstrated that the particle density of aggregates from the ten types of water purification sludge were mostly less than 1.8 g/cm3. In addition, the dry unit weight, the organic impurity, the ignition loss, and other characteristics of synthesized aggregates met the requirement of CNS standards, while its water absorption and crushing strength also fulfilled the general commercial specifications. Therefore, reclamation of water purification sludge for production of lightweight aggregate is indeed feasible.

  5. Hydrogeological and geophysics study of Conaprole industrial plant Tarariras Colonia province

    International Nuclear Information System (INIS)

    Cardozo, L.; Mari, C.; Massa, E.; Cicalese, H.

    1985-01-01

    To application of the National Cooperative of Producers of Milk (CONAPROLE), it proceeded to a hydro geologic and geophysical studies for the industrial plant of that Cooperative, located in Tarariras city (Colonia province) where it was determined the technical feasibility of exploration and exploitation of groundwater in one or more waterdrills to be executed in the proximities of the industrial plant .

  6. Visualization study of operators' plant knowledge model

    International Nuclear Information System (INIS)

    Kanno, Tarou; Furuta, Kazuo; Yoshikawa, Shinji

    1999-03-01

    Nuclear plants are typically very complicated systems and are required extremely high level safety on the operations. Since it is never possible to include all the possible anomaly scenarios in education/training curriculum, plant knowledge formation is desired for operators to enable thein to act against unexpected anomalies based on knowledge base decision making. The authors have been conducted a study on operators' plant knowledge model for the purpose of supporting operators' effort in forming this kind of plant knowledge. In this report, an integrated plant knowledge model consisting of configuration space, causality space, goal space and status space is proposed. The authors examined appropriateness of this model and developed a prototype system to support knowledge formation by visualizing the operators' knowledge model and decision making process in knowledge-based actions with this model on a software system. Finally the feasibility of this prototype as a supportive method in operator education/training to enhance operators' ability in knowledge-based performance has been evaluated. (author)

  7. Study on plant concept for gas cooled fast reactor

    International Nuclear Information System (INIS)

    Moribe, Takeshi; Kubo, Shigenobu; Saigusa, Toshiie; Konomura, Mamoru

    2003-05-01

    In 'Feasibility Study on Commercialized Fast Reactor Cycle System', technological options including various coolant (sodium, heavy metal, gas, water, etc.), fuel type (MOX, metal, nitride) and output power are considered and classified, and commercialized FBR that have economical cost equal to LWR are pursued. In conceptual study on gas cooled FBR in FY 2002, to identify the prospect of the technical materialization of the helium cooled FBR using coated particle fuel which is an attractive concept extracted in the year of FY2001, the preliminary conceptual design of the core and entire plant was performed. This report summarizes the results of the plant design study in FY2002. The results of study is as follows. 1) For the passive core shutdown equipment, the curie point magnet type self-actuated device was selected and the device concept was set up. 2) For the reactor block, the concept of the core supporting structure, insulators and liners was set up. For the material of the heat resistant structure, SiC was selected as a candidate. 3) For the seismic design of the plant, it was identified that a design concept with three-dimensional base isolation could be feasible taking the severe seismic condition into account. 4) For the core catcher, an estimation of possible event sequences under severe core damage condition was made. A core catcher concept which may suit the estimation was proposed. 5) The construction cost was roughly estimated based on the amount of materials and its dependency on the plant output power was evaluated. The value for a small sized plant exceeds the target construction cost about 20%. (author)

  8. A cask maintenance facility feasibility study

    International Nuclear Information System (INIS)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1989-01-01

    The Oak Ridge National Laboratory (ORNL) is supporting the USDOE Office of Civilian Radioactive Waste Management (OCRWM) in developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, green field facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrieveable Storage (MRS) facility. The data, design, and estimated cost resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone green field configuration because of the flexibility this design approach provides. A stand-alone facility requires the inclusion with support functions as well as the primary process facilities thus yielding a comprehensive design evaluation and cost estimate. For example, items such as roads, security and waste processing which might be shared with an integrated or collocated facility have been fully costed in the feasibility study. Thus, while the details of the facility design might change, the overall concept used in the study can be applied to other facility configurations as planning for the total FWMS develops

  9. Case study of siting technology for underground nuclear power plant

    International Nuclear Information System (INIS)

    Hibino, Satoshi; Komada, Hiroya; Honsho, Shizumitsu; Fujiwara, Yoshikazu; Motojima, Mutsumi; Nakagawa, Kameichiro; Nosaki, Takashi

    1991-01-01

    Underground siting method is one of new feasible siting methods for nuclear power plants. This report presents the results on case studies on underground siting. Two sites of a steeply inclined and plateau like configurations were selected. 'Tunnel type cavern; all underground siting' method was applied for the steeply inclined configuration, and 'shaft type semi-cavern; partial underground siting' method was applied for the plateau like configuration. The following designs were carried out for these two sites as case studies; (1) conceptual designs, (2) geological surveys and rock mechanics tests, (3) stability analysis during cavern excavations, (4) seismic stability analysis of caverns during earthquake, (5) reinforcement designs for caverns, (6) drainage designs. The case studies showed that these two cases were fully feasible, and comparison between two cases revealed that the 'shaft type semi-cavern; partial underground siting' method was more suitable for Japanese islands. As a first step of underground siting, therefore, the authors recommend to construct a nuclear power plant by this method. (author)

  10. Aging/Systems Interaction Study, Component Residual Lifetime Evaluation and Feasibility of Relicensing. Progress report, FY 1985

    International Nuclear Information System (INIS)

    Close, J.A.; Jacobs, P.T.; Korth, G.E.; Mudlin, J.M.; Server, W.L.; Spaletta, H.W.

    1985-10-01

    This report documents the work performed on four research tasks in Fiscal Year 1985 (FY-1985) which were part of the Aging/Systems Interaction Study, Component Residual Lifetime Evaluation and Feasibility of Relicensing Project. The technical and management/institutional objectives for the project are described, followed by a description of the results of each task. The work on Task 1 involved identifying and prioritizing new research activities for the Nuclear Regulatory Commission (NRC) Nuclear Plant Aging Research (NPAR) Program. A proposed methodology and plan for aging-system interaction studies was developed in Task 2. The description of Task 3 work comprises a summary of nuclear plant life extension activities in the US, the technical basis associated with the residual life of metallic materials and a proposed plan for research on residual life assessment. Task 4 describes the initial evaluation of selected Standard Review Plan (NUREG-0800) sections to investigate the feasibility of relicensing. 14 refs., 13 figs., 20 tabs

  11. 100-BC-1 Operable Unit focused feasibility study

    International Nuclear Information System (INIS)

    Day, R.E.

    1994-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act feasibility study includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study constitutes the Phase 3 portion of the feasibility study process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The focused feasibility study process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific focused feasibility study document, such as this one. The focused feasibility study process is performed by implementing a ''plug-in'' style approach; as defined in greater detail in the Process Document, which is a companion to this document. The objective of this focused feasibility study is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures for candidate waste sites associated with the 100-BC-1 Operable Unit which is located in the north-central part of the Hanford Site. The interim remedial measure candidate waste sites are determined in the Limited Field Investigation (DOE-RL 1993b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  12. Financial feasibility analysis on small medium reactor nuclear power plant (SMR NPP) project in Indonesia under uncertainty

    International Nuclear Information System (INIS)

    Nuryanti; Suparman; Mochamad Nasrullah; Elok Satiti Amitayani; Wiku Lulus Widodo

    2015-01-01

    NPP SMR is one alternative to overcome the Outside Java Bali region's dependence on diesel power plant. One crucial issue in the NPP project (including SMR) would be financing, associated with the capital-intensive nature of the project. In addition, the SMR NPP project also be vulnerable in occurrence of some uncertainties. Therefore, this study aimed to analyze the financial feasibility of SMR NPP project by accommodating the possibility of the uncertainties. The methodology used is probabilistic analysis which was performed by Monte Carlo technique. This technique simulates the relationship between the uncertainty variables with financial feasibility indicators. The results showed that in probabilistic approach, SMR NPP project is considered feasible on the 'most probable value' of electricity selling price of 15 cents/kWh, indicated by positive average value of NPV (US$ 135,324,004) and the average value of both of IRRs are bigger than MARR (IRR project = 10.65 %, IRR Equity = 14.29 %, while MARR = 10 %). The probability of rejection of the SMR project was about 20 %. The three main variables that are most influential in the project were: selling price of electricity, investment cost and inflation rate. (author)

  13. Feasibility study of a dedicate nuclear desalination system: Low-pressure inherent heat sink nuclear desalination plant (LIND)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ho Sik; No, Hee Cheon; Jo, Yu Gwan; Wivisono, Andhika Feri; Park, Byung Ha; Choi, Jin Young; Lee, Jeong Ik; Jeong, Yong Hoon; Cho, Nam Zin [Dept. of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2015-04-15

    In this paper, we suggest the conceptual design of a water-cooled reactor system for a low-pressure inherent heat sink nuclear desalination plant (LIND) that applies the safety-related design concepts of high temperature gas-cooled reactors to a water-cooled reactor for inherent and passive safety features. Through a scoping analysis, we found that the current LIND design satisfied several essential thermal-hydraulic and neutronic design requirements. In a thermal-hydraulic analysis using an analytical method based on the Wooton-Epstein correlation, we checked the possibility of safely removing decay heat through the steel containment even if all the active safety systems failed. In a neutronic analysis using the Monte Carlo N-particle transport code, we estimated a cycle length of approximately 6 years under 200 MW{sub th} and 4.5% enrichment. The very long cycle length and simple safety features minimize the burdens from the operation, maintenance, and spent-fuel management, with a positive impact on the economic feasibility. Finally, because a nuclear reactor should not be directly coupled to a desalination system to prevent the leakage of radioactive material into the desalinated water, three types of intermediate systems were studied: a steam producing system, a hot water system, and an organic Rankine cycle system.

  14. Feasibility study of a dedicated nuclear desalination system: Low-pressure Inherent heat sink Nuclear Desalination plant (LIND

    Directory of Open Access Journals (Sweden)

    Ho Sik Kim

    2015-04-01

    Full Text Available In this paper, we suggest the conceptual design of a water-cooled reactor system for a low-pressure inherent heat sink nuclear desalination plant (LIND that applies the safety-related design concepts of high temperature gas-cooled reactors to a water-cooled reactor for inherent and passive safety features. Through a scoping analysis, we found that the current LIND design satisfied several essential thermal–hydraulic and neutronic design requirements. In a thermal–hydraulic analysis using an analytical method based on the Wooton–Epstein correlation, we checked the possibility of safely removing decay heat through the steel containment even if all the active safety systems failed. In a neutronic analysis using the Monte Carlo N-particle transport code, we estimated a cycle length of approximately 6 years under 200 MWth and 4.5% enrichment. The very long cycle length and simple safety features minimize the burdens from the operation, maintenance, and spent-fuel management, with a positive impact on the economic feasibility. Finally, because a nuclear reactor should not be directly coupled to a desalination system to prevent the leakage of radioactive material into the desalinated water, three types of intermediate systems were studied: a steam producing system, a hot water system, and an organic Rankine cycle system.

  15. Study to evaluate the feasibility of constructing a retrofit containment for the 105-L reactor at the Savannah River Plant

    International Nuclear Information System (INIS)

    Quinn, R.D.

    1989-01-01

    This paper presents a summary of a study performed to determine the feasibility of constructing a retrofit containment dome meeting the requirements of the ASME Boiler and Pressure Vessel Code for nuclear containment vessels over the existing Savannah River 105-L reactor. Using existing large dome structures as a guide, design concepts were developed and analyses performed to evaluate the structural feasibility of containment dome structures. Construction schedules and costs were estimated to assess financial feasibility as well. It was concluded that such a retrofit containment dome was structurally feasible and within the capabilities of present day construction technology

  16. Study of the techno-economic feasibilities of potato and onion irradiation in Syria

    International Nuclear Information System (INIS)

    Al-Bachir, M.; Sharabi, N.; Midani, M.A.

    1991-06-01

    Ionizing radiation has been used for food preservation in many ways, among them sprout inhibition in onion and potato. Experiments showed that irradiation of these crops using doses between 50 - 150 Gy prevented sprouting for up to 6 months during storage. Priliminary experiments in Syria proved the effectiveness of such treatment in these two crops. In addition to the technical, social, and political feasibility, this study includes, general description of the suggested plant ( 60 Co 3.7 PBq), estimated cost, location, and the tentative operation schedual. The study showed that the cost of irradiation will be about $ 8.7 per ton, this will save the country about $ 3.760.000 per year. The study showed the possitive effect of establishing this plant. (author). 74 refs., 44 tabs., 15 figs

  17. Preliminary carbon dioxide capture technical and economic feasibility study evaluation of carbon dioxide capture from existing fired plants by hybrid sorption using solid sorbents

    Energy Technology Data Exchange (ETDEWEB)

    Benson, Steven; Envergex, Srivats; Browers, Bruce; Thumbi, Charles

    2013-01-01

    Barr Engineering Co. was retained by the Institute for Energy Studies (IES) at University of North Dakota (UND) to conduct a technical and economic feasibility analysis of an innovative hybrid sorbent technology (CACHYS™) for carbon dioxide (CO2) capture and separation from coal combustion–derived flue gas. The project team for this effort consists of the University of North Dakota, Envergex LLC, Barr Engineering Co., and Solex Thermal Science, along with industrial support from Allete, BNI Coal, SaskPower, and the North Dakota Lignite Energy Council. An initial economic and feasibility study of the CACHYS™ concept, including definition of the process, development of process flow diagrams (PFDs), material and energy balances, equipment selection, sizing and costing, and estimation of overall capital and operating costs, is performed by Barr with information provided by UND and Envergex. The technology—Capture from Existing Coal-Fired Plants by Hybrid Sorption Using Solid Sorbents Capture (CACHYS™)—is a novel solid sorbent technology based on the following ideas: reduction of energy for sorbent regeneration, utilization of novel process chemistry, contactor conditions that minimize sorbent-CO2 heat of reaction and promote fast CO2 capture, and a low-cost method of heat management. The technology’s other key component is the use of a low-cost sorbent.

  18. A feasibility study on the longer cycle operation of Yonggwang nuclear power plants 3 and 4 NSSS design

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Young Joon; Choi, Hae Yoon; Chang, Young Woo [Korea Atomic Energy Research Inst., Daeduk (Korea, Republic of)] [and others

    1996-06-01

    A feasible study on the NSSS design safety assessment is performed for a longer cycle operation of Yonggang units 3 and 4. The analysis of the drift errors increased and setting point changed for safety related instrument channels due to the longer refueling interval was done to assess the impact on the operational safety performance and availability of the plant if the refueling interval was extended. In the result of LOCA analysis, even though the Peak Cladding Temperature (PCT) is slightly increased due to Pin/Box ratio decrease, the PCT has enough margin and, therefore, it was proven to be acceptable. From the perspective of return-to-power and the pre-trip fuel performance during the transient operation, an impact on the results of an SLB accident analysis were assessed. The overall trend of the longer refueling operation of 18 months is similar to the standard refuel operation of 12 months. The possibility of the return to power during SLB accident condition was estimated, the detailed analysis of the reactor core using the 3-dimensional model methodology is required to confirm the fuel integrity. 11 refs.(Author) .new.

  19. The feasibility study: a health economics perspective

    Directory of Open Access Journals (Sweden)

    Brenda Gannon

    2017-02-01

    Full Text Available The remit of research funding bodies is to prioritise funding for research that is of relevance and of high quality. This in turn will aim to raise the quality of healthcare and benefit to patients. Researchers are faced with increasing demands and expectations from the public purse and patients. The emphasis is to improve the quality of their research, with the ultimate aim of improving population health. While guidelines on feasibility study methods concentrate heavily on trials, there appears less guidance on application of health economics within feasibility studies, yet these are a less costly way to determine first of all if a full randomised controlled trial (RCT is feasible. A feasibility study assesses if the study can be done in a small RCT type study. Since by definition, a feasibility study does not evaluate the outcome, researchers often omit the health economics aspects but do however include statistical analysis. This leaves a gap in interpretation for policy makers and potential funders. It also means that any resulting publication does not include relevant information and therefore comparison across studies in terms of difficulty in collecting cost data is not possible. The main aim of this commentary therefore, is to demonstrate a suggested health economics analysis within a feasibility study and to recommend to researchers to include these aspects from the conception of their intervention. This paper proposes a number of points, with rationale for each point, to indicate the health economics data and the potential benefits required for coherent interpretation of the feasibility of future economic evaluations in a full trial. Economic evaluation is necessary if implementation into standard care is anticipated. Therefore, collection and summary analysis of relevant data is good practice at each point of the intervention development. Current guidelines for economic evaluation, for example, The Medical Research Guidelines in the

  20. Feasibility study on the introduction of hybrid buses; Hybrid bus donyu kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The purpose of this research is to design pilot projects for introducing hybrid buses into the public transportation sector. This research also covers contents regarding hybrid buses with a trolley-collector motor and a diesel engine, to identify technical and economical problems and to analyze cost beneficiation using hybrid buses. The trolley parallel hybrid system has been employed for the feasibility study. This system has abundant operation results in Europe and the USA. Its battery is small or is not necessary, and the maintenance cost is also low. As a result of the feasibility study, reduction effects of CO2 emission were found out. When the CO2 generation at the power plant is not counted, the reduction effect was estimated to be 32% compared with the CO2 emission from diesel buses. When the CO2 generation at the power plant is considered, it was estimated to be 18%. The cost beneficiation was investigated for the cases of the transportations using trolley system surrounding a medium-scale terminal among large-scale housing development, tourist resort, and stations. The annual income is estimated to be larger than the annual payment in each case. It was found that the hybrid bus is economically established. 17 refs., 48 figs., 41 tabs.

  1. Feasibility study of calibration strategy for direct quantitative measurement of K and Mg in plant material by laser-induced breakdown spectrometry

    Directory of Open Access Journals (Sweden)

    Daniel Menezes Silvestre

    2015-09-01

    Full Text Available The calibration and quantitative measurement is the “Achilles heel” of the LIBS technique. This paper deals with a method developed for the direct measurement of K and Mg in plant samples. Instrumental parameters were optimized and the best condition found was a 50 μm spot size, 10 Hz laser repetition rate, 75 accumulated laser pulses with 25 mJ/pulse and 0.25 μs of delay time. For method calibration, the use of synthetic standard calibrating material prepared by the addition of increasing concentrations of K and Mg in wood, filter paper and babassu mesocarp was proposed in order to assess the feasibility of using these various matrices in plant samples analysis. The limits of detection of proposed method were 2–30 and 6–27 μg g−1 for K and Mg, respectively. The use of the carbon emission wavelength at 247.856 nm was used as internal standard to improve the analytical results. Certified reference materials of plants were used to check the accuracy of the proposed method and recovery around 82% and 100% were obtained in all cases.

  2. Feasibility study of fusion breeding blanket concept employing graphite reflector

    International Nuclear Information System (INIS)

    Cho, Seungyon; Ahn, Mu-Young; Lee, Cheol Woo; Kim, Eung Seon; Park, Yi-Hyun; Lee, Youngmin; Lee, Dong Won

    2015-01-01

    Highlights: • A Helium-Cooled Ceramic Reflector (HCCR) breeding blanket concept adopts graphite as a reflector material by reducing the amount of beryllium multiplier. • Its feasibility was investigated in view point of the nuclear performance as well as material-related issues. • A nuclear analysis is performed under the fusion reactor condition to address the feasibility of graphite reflector in breeding blanket. • Also, the chemical stability of the graphite is investigated considering the chemical stability under accident conditions. • In conclusion, the adaptation of graphite reflector in breeding blanket is intrinsically safe and plausible under fusion reactor condition. - Abstract: To obtain high tritium breeding performance with limited blanket thickness, most of solid breeder blanket concepts employ a combination of lithium ceramic as a breeder and beryllium as a multiplier. In this case, considering that huge amount of beryllium are needed in fusion power plants, its handling difficulty and cost can be a major factor to be accounted for commercial use. Korea has proposed a Helium-Cooled Ceramic Reflector (HCCR) breeding blanket concept relevant to fusion power plants. Here, graphite is used as a reflector material by reducing the amount of beryllium multiplier. Its feasibility has been investigated in view point of the nuclear performance as well as material-related issues. In this paper, a nuclear analysis is performed under the fusion reactor condition to address the feasibility of graphite reflector in breeding blanket, considering tritium breeding capability and neutron shielding and activation aspects. Also, the chemical stability of the graphite is investigated considering the chemical stability under accident conditions, resulting in that the adaptation of graphite reflector in breeding blanket is intrinsically safe and plausible under fusion reactor condition.

  3. Feasibility study of fusion breeding blanket concept employing graphite reflector

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Seungyon, E-mail: sycho@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Ahn, Mu-Young [National Fusion Research Institute, Daejeon (Korea, Republic of); Lee, Cheol Woo; Kim, Eung Seon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Park, Yi-Hyun; Lee, Youngmin [National Fusion Research Institute, Daejeon (Korea, Republic of); Lee, Dong Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    Highlights: • A Helium-Cooled Ceramic Reflector (HCCR) breeding blanket concept adopts graphite as a reflector material by reducing the amount of beryllium multiplier. • Its feasibility was investigated in view point of the nuclear performance as well as material-related issues. • A nuclear analysis is performed under the fusion reactor condition to address the feasibility of graphite reflector in breeding blanket. • Also, the chemical stability of the graphite is investigated considering the chemical stability under accident conditions. • In conclusion, the adaptation of graphite reflector in breeding blanket is intrinsically safe and plausible under fusion reactor condition. - Abstract: To obtain high tritium breeding performance with limited blanket thickness, most of solid breeder blanket concepts employ a combination of lithium ceramic as a breeder and beryllium as a multiplier. In this case, considering that huge amount of beryllium are needed in fusion power plants, its handling difficulty and cost can be a major factor to be accounted for commercial use. Korea has proposed a Helium-Cooled Ceramic Reflector (HCCR) breeding blanket concept relevant to fusion power plants. Here, graphite is used as a reflector material by reducing the amount of beryllium multiplier. Its feasibility has been investigated in view point of the nuclear performance as well as material-related issues. In this paper, a nuclear analysis is performed under the fusion reactor condition to address the feasibility of graphite reflector in breeding blanket, considering tritium breeding capability and neutron shielding and activation aspects. Also, the chemical stability of the graphite is investigated considering the chemical stability under accident conditions, resulting in that the adaptation of graphite reflector in breeding blanket is intrinsically safe and plausible under fusion reactor condition.

  4. Feasibility study of 24-month cycle using enriched Gadolinium as burnable poison for OPR1000

    Energy Technology Data Exchange (ETDEWEB)

    Moon, Sang-Rae; Shin, Ho-Cheol [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    All of cobalt-60 sources are imported to Korea. CANDU units are generally used to produce cobalt-60 at Bruce and Point Lepreau in Canada and Embalse in Argentina. China has started production of cobalt-60 using its CANDU 6 Qinshan Phase III nuclear power plant in 2009. For cobalt-60 production, the reactor's full complement of stainless steel adjusters is replaced with neutronically equivalent cobalt-59 adjusters, which are essentially invisible to reactor operation. With its very high neutron flux and optimized fuel burn-up, the CANDU has a very high cobalt-60 production rate in a relatively short time. This makes CANDU an excellent vehicle for bulk cobalt-60 production. Several studies have been performed to produce cobalt-60 using adjuster rod at Wolsong nuclear power plant. This study proposed new concept for producing cobalt-60 and performed the feasibility study. Bundle typed cobalt loading concept is proposed and evaluated the feasibility to fuel management without physics and system design change. The requirement to load cobalt bundle to the core was considered and several channels are nominated. The production of cobalt-60 source is very depend on the flux level and burnup directly.

  5. Biological methanation of hydrogen within biogas plants: A model-based feasibility study

    International Nuclear Information System (INIS)

    Bensmann, A.; Hanke-Rauschenbach, R.; Heyer, R.; Kohrs, F.; Benndorf, D.; Reichl, U.; Sundmacher, K.

    2014-01-01

    Highlights: • Simulation study about direct methanation of hydrogen within biogas plants. • In stationary operation two limitations, namely biological and transfer limit. • Biological limit at 4m H2 3 /m CO2 3 due to stoichiometry. • Dynamic behaviour shows three qualitatively different step responses. • A simple control scheme to meet the output quality was developed. - Abstract: One option to utilize excess electric energy is its conversion to hydrogen and the subsequent methanation. An alternative to the classical chemical Sabatier process is the biological methanation (methanogenesis) within biogas plants. In conventional biogas plants methane and carbon dioxide is produced. The latter can be directly converted to methane by feeding hydrogen into the reactor, since hydrogenotrophic bacteria are present. In the present contribution, a comprehensive simulation study with respect to stationary operating conditions and disturbances is presented. It reveals two qualitative different limitations, namely a biological limit (appr. at 4m H2 3 /m CO2 3 corresponds to 4.2m H2,STP 3 /m liq 3 /d) as well as a transfer limit. A parameter region for a safe operation was defined. The temporary operation with stationary unfeasible conditions was analysed and thereby three qualitatively different disturbances can be distinguished. In one of these the operation for several days is possible. On the basis of these results, a controller was proposed and tested that meets the demands on the conversion of hydrogen and also prevents the washout of the microbial community due to hydrogen overload

  6. PRE-FEASIBILITY STUDY FOR TREATMENT WETLAND APPLICATION FOR WASTEWATER TREATMENT IN DISPERSED DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Magdalena Gajewska

    2016-07-01

    Full Text Available The aim of the paper is to present the conducted analyses of pre-feasibility study of different approaches for wastewater management in a settlement of 180 persons. In the assessment both technical and economic aspects were analyzed. The costs were calculated for three different and, at the same time, most popular as well as possible technical solutions like: (i construction of local wastewater treatment plant with gravitational and pressurized networks, (ii construction of single family wastewater treatment plants, (iii construction of sealed septic tanks. Carried out analyses of investment and maintenance costs revealed that at the stage of construction the most expensive is local sewer network with treatment plant, while the construction of a single family treatment plant has similar cost regardless of the technology used. When the long term operation and investment cost are accounted the most economical reasonable solution is the application of wetland treatment for household wastewater treatment.

  7. Feasibility study for biomass power plants in Thailand. Volume 1. Main report. Export trade information

    International Nuclear Information System (INIS)

    1997-01-01

    This study, conducted by Black and Veatch, was funded by the U.S. Trade and Development Agency. The report presents a technical and commercial analysis for the development of three nearly identical electricity generating facilities (biomass steam power plants) in the towns of Chachoengsao, Suphan Buri, and Pichit in Thailand. The Main Report is divided into the following sections: (1.0) Executive Study; (2.0) Project Objectives; (3.0) Review of Combustion Technology for Biomass Fueled Steam Generator Units; (4.0) Conceptual Design; (5.0) Plant Descriptions; (6.0) Plant Operations Staffing; (7.0) Project Schedule; (8.0) Project Cost Estimate; (9.0) Financial Analysis; Appendix - Financial Analysis

  8. Status of feasibility study for various technical options of FBR systems

    International Nuclear Information System (INIS)

    Kani, Yoshio

    2000-01-01

    JNC (Japan Nuclear Cycle Development Institute) has started a new research project of feasibility studies (F/S) for a wide variety option of fast breeder reactor (FBR) and related fuel cycle in order to develop an economically competitive FBR cycle system fro commercialization. JNC and the electric untilities in Japan have established a new organization in JNC to perform the F/S since July 1, 1999. The organization has undertaken feasibility studies (F/S) in order to determine promising FBR cycle concepts and define necessary RandD tasks. The long-term targets of commercialized FBR cycle system are set as ensuring safety, economic competitiveness relative to future LWRs, efficient utilization of resources, reduction in environmental burden, and enhancement of nuclear non-proliferation. This paper describes the progress of design studies for a wide variety of technical options of FBR plants in the framework of the F/S. We make efforts towards considering all key issues so as not to fail to notice the best concept in a commercialized stage. In the study of technical options, the identified coolant types are sodium, heavy metal (lead and lead-bismuth), gas (carbon dioxide and helium ) and water (boiling water, pressurized water and supercritical water). The classified types of fuel are mixed oxide, nitride and metal. Design studies of small size modular plant concepts are also performed. We study many reactor concepts in combination with a coolant type and a fuel type, understand characteristics of each reactor concept based on our experience and an extensive survey of literature, and make a draft design of each reactor concept for rough estimation of construction costs. We also check how far the concept accomplishes each index (safety, economy, resource utilization, etc.) of design requirements, and will select several promising reactor concepts. (author)

  9. Extraction of uranium from seawater: chemical process and plant design feasibility study

    International Nuclear Information System (INIS)

    Campbell, M.H.; Frame, J.M.; Dudey, N.D.; Kiel, G.R.; Mesec, V.; Woodfield, F.W.; Binney, S.E.; Jante, M.R.; Anderson, R.C.; Clark, G.T.

    1979-02-01

    A major assessment was made of the uranium resources in seawater. Several concepts for moving seawater to recover the uranium were investigated, including pumping the seawater and using natural ocean currents or tides directly. The optimal site chosen was on the southeastern Puerto Rico coast, with the south U.S. Atlantic coast as an alternate. The various processes for extracting uranium from seawater were reviewed, with the adsorption process being the most promising at the present time. Of the possible adsorbents, hydrous titanium oxide was found to have the best properties. A uranium extraction plant was conceptually designed. Of the possible methods for contacting the seawater with the adsorbent, a continuous fluidized bed concept was chosen as most practical for a pumped system. A plant recovering 500 tonnes of U 3 O 8 per year requires 5900 cubic meters per second of seawater to be pumped through the adsorbent beds for a 70% overall recovery efficiency. Total cost of the plant was estimated to be about $6.2 billion. A computer model for the process was used for parametric sensitivity studies and economic projections. Several design case variations were developed. Other topics addressed were the impact of co-product recovery, environmental considerations, etc

  10. Extraction of uranium from seawater: chemical process and plant design feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, M.H.; Frame, J.M.; Dudey, N.D.; Kiel, G.R.; Mesec, V.; Woodfield, F.W.; Binney, S.E.; Jante, M.R.; Anderson, R.C.; Clark, G.T.

    1979-02-01

    A major assessment was made of the uranium resources in seawater. Several concepts for moving seawater to recover the uranium were investigated, including pumping the seawater and using natural ocean currents or tides directly. The optimal site chosen was on the southeastern Puerto Rico coast, with the south U.S. Atlantic coast as an alternate. The various processes for extracting uranium from seawater were reviewed, with the adsorption process being the most promising at the present time. Of the possible adsorbents, hydrous titanium oxide was found to have the best properties. A uranium extraction plant was conceptually designed. Of the possible methods for contacting the seawater with the adsorbent, a continuous fluidized bed concept was chosen as most practical for a pumped system. A plant recovering 500 tonnes of U/sub 3/O/sub 8/ per year requires 5900 cubic meters per second of seawater to be pumped through the adsorbent beds for a 70% overall recovery efficiency. Total cost of the plant was estimated to be about $6.2 billion. A computer model for the process was used for parametric sensitivity studies and economic projections. Several design case variations were developed. Other topics addressed were the impact of co-product recovery, environmental considerations, etc.

  11. Renewable Energy Feasibility Study Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rooney, Tim [Antares Group Inc.

    2013-10-30

    The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to assess the feasibility of solar photovoltaic (PV) installations. A solar energy project could provide a number of benefits to the Community in terms of potential future energy savings, increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a solar project’s overall feasibility, including: Technical appropriateness; Solar resource characteristics and expected system performance; Levelized cost of electricity (LCOE) economic assessment. The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to prepare a biomass resource assessment study and evaluate the feasibility of a bioenergy project on Community land. A biomass project could provide a number of benefits to the Community in terms of increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a biomass project’s overall feasibility, including: Resource analysis and costs; Identification of potential bioenergy projects; Technical and economic (levelized cost of energy) modeling for selected project configuration.

  12. Feasibility study of energy conservation at Vietnam Steel Corporation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Feasibility study was conducted of the project for energy conservation and reduction in greenhouse effect gas emission by introducing the honeycomb type heat storage burner technology to heating furnaces of Vietnam Steel Corporation (VSC). Furnaces for study are the bar mill furnace at Gia Sang plant of TISCO Steelorks, bar mill furnace at Thu Duc plant of SSC Steelworks, billet furnace at new bar mill of SSC Steelworks, slab furnace at new hot strip mill that VSC is now in the planning stage. As a result of the study, the energy conservation amount is 2,900 toe/y at TISCO Steelworks, 2,130 toe/y at SSC Steelworks, and 6,000 toe/y at VSC new hot strip mill, which totaled 11,030 toe/y. The amount of greenhouse effect gas reduction is 9,000 t-CO2/y at TISCO, 6,600 t-CO2/y at SSC, and 18,600 t-CO2/y at VSC, which totaled 34,200 t/y. The total investment amount is 0.23, 0.44, 1.32 and 1.99 billion yen for each. As to the profitability, the internal earning rate is 24%, 86%, 97% and 51% for each, which are all favorable. (NEDO)

  13. A cask maintenance facility feasibility study

    International Nuclear Information System (INIS)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1989-01-01

    The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations

  14. Fiscal 1998 research report. Feasibility study on improvement of the thermal efficiency of existing coal- fired thermal power plants in China; 1998 nendo chosa hokokusho. Chugoku kisetsu sekitan karyoku hatsudensho koritsu kojo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the improvement project of the thermal efficiency of existing coal-fired thermal power plants in China to relate it to Japanese clean development mechanism. General study was made on the facility and operation of existing 300MW coal-fired thermal power plant units, and on-site study was also made on improvement of the thermal efficiency of some typical power plants. Based on these studies, effective improvement measures were identified, and general evaluation was carried out based on a cost effectiveness. The study result showed that the total efficiency improvement measures improve the plant efficiency of a standard 300MW unit by nearly 4%, and reduce CO{sub 2} emission by 184 ktons/y. The efficiency improvement measures for 10 300MW units by 2010 are estimated to reduce CO{sub 2} emission by 1.84 Mtons/y in 2010. This reduced emission is equivalent to annual emission of one 300MW unit. This project is reasonable enough if the cooperation range between Japan and the other country, and a source of funds are clarified. (NEDO)

  15. The Results of Feasibility Study of Co-generation NPP With Innovative VK-300 Simplified Boiling Water Reactor

    International Nuclear Information System (INIS)

    Kuznetsov, Yury N.

    2006-01-01

    The co-generation nuclear power plant (CNPP) producing electricity and district heating heat is planned to be constructed in Archangelsk Region of Russia. Following the 'Letter of Intent' signed by Governor of Archangelsk region and by Minister of the Russian Federation for atomic energy the feasibility study of the Project has been done. The NPP will be based on the four co-generation nuclear power units with the Russian VK-300 SBWR. The innovative passive VK-300 reactor facility has been designed on the basis of well-established nuclear technologies, proven major components, the operating experience of the prototype VK-50 reactor in RIAR, Dimitrovgrad, and the experience in designing such reactors as SBWR (GE) and SWR-1000 (Siemens). The CNPP's total power is planned to be 1000 MW(e) and district-heating heat production capacity 1600 Gcal/h. A detailed description of the results of the feasibility study is presented in the report. The results of the feasibility study have shown that the Archangelsk CGNP is feasible in terms of engineering, economics and production. (authors)

  16. The results of feasibility study of co-generation NPP with innovative VK-300 simplified boiling water reactor

    International Nuclear Information System (INIS)

    Kuznetsov, Yu. N.; Gabaraev, B. A.

    2004-01-01

    The co-generation nuclear power plant (CNPP) producing electricity and district-heating heat is planned to be constructed in Archangelsk Region of Russia. Following the Letter of Intent signed by Governor of Archangelsk region and by Minister of the Russian Federation for atomic energy the feasibility study of the Project has been done. The NPP will be based on the four co-generation nuclear power units with the Russian VK-300 SBWR. The innovative passive VK-300 reactor facility has been designed on the basis of well-established nuclear technologies, proven major components, the operating experience of the prototype VK-50 reactor in RIAR, Dimitrovgrad, and the experience in designing such reactors as SBWR (GE) and SWR-1000 (Siemens). The CNPP's total power is planned to be 1000 MW(e) and district-heating heat production capacity 1600 Gcal /h. A detailed description of the results of the feasibility study is presented in the report. The results of the feasibility study have shown that the Archangelsk CGNP is feasible in terms of engineering, economics and production.(author)

  17. Experimental Study on Feasibility of Non Potable Water with Lime on Properties of Ppc

    Science.gov (United States)

    Reddy Babu, G.; Madhusudana Reddy, B.; Ramana, N. V.; Sudharshan Reddy, B.

    2017-08-01

    This research aimed to investigate feasibility of outlet water of water treatment plant and limewater on properties of Portland pozzolana cement (PPC). Twenty water treatment plants were found out in the Bhimavaram municipality region in West Godavari district, Andhra Pradesh, India. Approximately, each plant supplying potable water about 4000 to 5000 L/day. All plants are extracting ground water and treating through Reverse Osmosis (RO) process. At outlet, huge quantity of wasted water is being discharged into side drains in Bhimavaram municipality. One typical treatment plant was selected, and water at outlet was collected and Physical and chemical analysis was carried out as per producer described in APHA. The effect of plant outlet water(POW), lime water(LM), and plant outlet water with lime (POWL) on physical properties i.e., setting times, compressive strength, and flexural strength of Portland pozzolana Cement (PPC) were studied in laboratory and compared same with reference specimens i.e., made with Distilled Water (DW) as mixing water. No significant change was observed in initial and finial setting time in POW, LW, and (POWL) as compared with reference specimens made with distilled water (DW). Compressive strength was significantly increased with LW and (POWL) specimens compared to that of reference specimens. XRD technique was employed to study the mineralogical analysis.

  18. A feasibility study for the development of an SCWR in Korea

    International Nuclear Information System (INIS)

    Hong, Sung-Yull; Kim, Yong-Bae; Bae, Seong-Man; Lee, Kwangho; Kim, Junhyung; Bae, Yoon-Yeong

    2008-01-01

    Korea is participating in international collaboration activities since the selection of supercritical water-cooled reactor (SCWR) as one of the viable candidates for Generation IV reactor systems in 2002. The SCWR has been selected by Generation IV International Forum (GIF) since it is a very feasible candidate reactor system for a large-scale electricity production in commercially viable manner. However, the level of Korean participation is still limited to several key areas and the decision-making on whether going into full-scale research is yet to be made. In three circumstances it has been decided to launch a feasibility study in March 2007 to assess the domestic capability and resources as well as economics for development of an SCWR and to identify the required research areas. This paper introduces the project named 'A feasibility study for the development of an SCWR in Korea', which is sponsored by MEST (Ministry of Education, Science and Technology) in Korea. The main purpose of this study is to provide a basis for establishing a government policy in consideration of the unique domestic environment for SCWR development. This study includes three different areas of evaluation aspect, i.e., policy and environment, technology and safety, and economics. In policy and environment aspects, the needs of SCWR development is evaluated in terms of future electricity demand, reactor type strategy, fuel cycle policy, and available infrastructure in Korea, etc. In technology and safety aspects, evaluation is performed to identify the most optimum way of SCWR R and D strategy and several fundamental studies including heat transfer, code developments, and materials are performed in parallel. Finally, in economic aspect, the economic feasibility of SCWR development is assessed in comparison with the Korean nuclear power plants OPR1000 and APR1400 and other comparable overseas reactors. This study will be finished by 2010 and the results of the assessment will become a

  19. Feasibility study on floating nuclear power plant (2). Safety design study of FNPP. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Yabuuchi, Noriaki; Shimazaki, Junya; Ochiai, Masaaki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Takahashi, Masao [Niigata Engineering Co. Ltd., Tokyo (Japan); Nakazawa, Toshio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Sato, Kazuo [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan)

    2001-02-01

    In the previous report of 'Conceptual Design Study of FNPP (Floating Nuclear Power Plant)', a design study on a concept for FNPP, which is sited off the sea coast on the open sea with water depth of 20m and it is moored on protected sea by the breakwater was conducted and the floating platform guarded by the breakwater was found to be stable enough to install the nuclear power plant from analysis simulating the movement of the platform due to sea wave or wind. In this report, studies on a basic safety design concept of the FNPP, setting natural phenomena for design condition, required safety functions and a review on dynamic analysis of the large floating structure are presented. The studies revealed that the stability of the floating platform is an essential issue for the FNPP soundness, and the design base natural phenomena such as S1 and S2-class storm including S1 and S2-class earthquake should be considered in evaluation of the stability of the floating platform, and it is one of key technical subjects how to set the magnitude of these storm in application of design evaluation on each FNPP case. (J.P.N.)

  20. Aleutian Pribilof Islands Wind Energy Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Bruce A. Wright

    2012-03-27

    Under this project, the Aleutian Pribilof Islands Association (APIA) conducted wind feasibility studies for Adak, False Pass, Nikolski, Sand Point and St. George. The DOE funds were also be used to continue APIA's role as project coordinator, to expand the communication network quality between all participants and with other wind interest groups in the state and to provide continued education and training opportunities for regional participants. This DOE project began 09/01/2005. We completed the economic and technical feasibility studies for Adak. These were funded by the Alaska Energy Authority. Both wind and hydro appear to be viable renewable energy options for Adak. In False Pass the wind resource is generally good but the site has high turbulence. This would require special care with turbine selection and operations. False Pass may be more suitable for a tidal project. APIA is funded to complete a False Pass tidal feasibility study in 2012. Nikolski has superb potential for wind power development with Class 7 wind power density, moderate wind shear, bi-directional winds and low turbulence. APIA secured nearly $1M from the United States Department of Agriculture Rural Utilities Service Assistance to Rural Communities with Extremely High Energy Costs to install a 65kW wind turbine. The measured average power density and wind speed at Sand Point measured at 20m (66ft), are 424 W/m2 and 6.7 m/s (14.9 mph) respectively. Two 500kW Vestas turbines were installed and when fully integrated in 2012 are expected to provide a cost effective and clean source of electricity, reduce overall diesel fuel consumption estimated at 130,000 gallons/year and decrease air emissions associated with the consumption of diesel fuel. St. George Island has a Class 7 wind resource, which is superior for wind power development. The current strategy, led by Alaska Energy Authority, is to upgrade the St. George electrical distribution system and power plant. Avian studies in Nikolski

  1. Cogeneration: Key feasibility analysis parameters

    International Nuclear Information System (INIS)

    Coslovi, S.; Zulian, A.

    1992-01-01

    This paper first reviews the essential requirements, in terms of scope, objectives and methods, of technical/economic feasibility analyses applied to cogeneration systems proposed for industrial plants in Italy. Attention is given to the influence on overall feasibility of the following factors: electric power and fuel costs, equipment coefficients of performance, operating schedules, maintenance costs, Italian Government taxes and financial and legal incentives. Through an examination of several feasibility studies that were done on cogeneration proposals relative to different industrial sectors, a sensitivity analysis is performed on the effects of varying the weights of different cost benefit analysis parameters. With the use of statistical analyses, standard deviations are then determined for key analysis parameters, and guidelines are suggested for analysis simplifications

  2. Haida Gwaii / Queen Charlotte Islands demonstration tidal power plant feasibility study : summary results

    Energy Technology Data Exchange (ETDEWEB)

    Tu, A. [BC Hydro, Burnaby, BC (Canada)

    2008-07-01

    Remote communities may benefit from using tidal energy in terms of reduced diesel fuel consumption and the associated greenhouse gas emissions. A study was conducted to assess the feasibility for a tidal demonstration project on the Haida Gwaii, Queen Charlotte Islands. Candidate communities were scanned for resource potential, load profile, infrastructure distribution and community interest. This presentation focused on choosing an appropriate site for a given tidal power technology. Three hotspots in Masset Sound were identified as well as one hotspot at Juskatla Narrows. Technology providers were solicited for information on unit performance, cost, and trials to date. The presentation noted that demonstration or future commercial deployment is limited by resource and by the ability of the grid to accommodate tidal power. The presentation concluded with next steps which include publishing the study. tabs., figs.

  3. Methanol production with elemental phosphorus byproduct gas: technical and economic feasibility

    Energy Technology Data Exchange (ETDEWEB)

    Lyke, S.E.; Moore, R.H.

    1981-01-01

    The technical and economic feasibility of using a typical, elemental, phosphorus byproduct gas stream in methanol production is assessed. The purpose of the study is to explore the potential of a substitute for natural gas. The first part of the study establishes economic tradeoffs between several alternative methods of supplying the hydrogen which is needed in the methanol synthesis process to react with CO from the off gas. The preferred alternative is the Battelle Process, which uses natural gas in combination with the off gas in an economically sized methanol plant. The second part of the study presents a preliminary basic design of a plant to (1) clean and compress the off gas, (2) return recovered phosphorus to the phosphorus plant, and (3) produce methanol by the Battelle Process. Use of elemental phosphorus byproduct gas in methanol production appears to be technically feasible. The Battelle Process shows a definite but relatively small economic advantage over conventional methanol manufacture based on natural gas alone. The process would be economically feasible only where natural gas supply and methanol market conditions at a phosphorus plant are not significantly less favorable than at competing methanol plants. If off-gas streams from two or more phosphorus plants could be combined, production of methanol using only offgas might also be economically feasible. The North American methanol market, however, does not seem likely to require another new methanol project until after 1990. The off-gas cleanup, compression, and phosphorus-recovery system could be used to produce a CO-rich stream that could be economically attractive for production of several other chemicals besides methanol.

  4. Nuclear Power Plant Lifetime Management Study (I)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Yull; Jeong, Ill Seok; Jang, Chang Heui; Song, Taek Ho; Song, Woo Young [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Jin, Tae Eun [Korea Power Engineering Company Consulting and Architecture Engineers, (Korea, Republic of); Kim, Woo Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    As the operation-year of nuclear power plant increases and finding sites for new nuclear power plant becomes harder, a comprehensive and systematic nuclear plant lifetime management(PLIM) program including life extension has to be established for stable and safe supply of electricity. A feasibility study was conducted to systematically evaluate technical, economic and regulatory aspect of plant lifetime managements and plant life extension for Kori-1 nuclear power plant. For technical evaluation of nuclear power plant, 13 major components were selected for lifetime evaluation by screening system. structure, and components(SSCs) of the plant. It was found that except reactor pressure vessel, which needs detailed integrity analysis, and low pressure turbine, which is scheduled to be replaced, 11 out of 13 major components have sufficient service life, for more than 40 years. Because domestic rules and regulations related to license renewal has not yet been written, review on the regulatory aspect of life extensions was conducted using US NRC rules and regulations. A cooperative effort with nuclear regulatory body is needed for early completion of license renewal rules and regulations. For economic evaluation of plant lifetime extension, a computer program was developed and used. It was found that 10 to 20 year of extension operation of Kori-1 nuclear power plant was proved. Based on the results, next phase of plant lifetime management program for detailed lifetime evaluation and presenting detailed implementation schedule for plant refurbishment for lifetime extension should be followed. (author). 74 refs., figs.

  5. Nuclear Power Plant Lifetime Management Study (I)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Yull; Jeong, Ill Seok; Jang, Chang Heui; Song, Taek Ho; Song, Woo Young [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Jin, Tae Eun [Korea Power Engineering Company Consulting and Architecture Engineers, (Korea, Republic of); Kim, Woo Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-12-31

    As the operation-year of nuclear power plant increases and finding sites for new nuclear power plant becomes harder, a comprehensive and systematic nuclear plant lifetime management(PLIM) program including life extension has to be established for stable and safe supply of electricity. A feasibility study was conducted to systematically evaluate technical, economic and regulatory aspect of plant lifetime managements and plant life extension for Kori-1 nuclear power plant. For technical evaluation of nuclear power plant, 13 major components were selected for lifetime evaluation by screening system. structure, and components(SSCs) of the plant. It was found that except reactor pressure vessel, which needs detailed integrity analysis, and low pressure turbine, which is scheduled to be replaced, 11 out of 13 major components have sufficient service life, for more than 40 years. Because domestic rules and regulations related to license renewal has not yet been written, review on the regulatory aspect of life extensions was conducted using US NRC rules and regulations. A cooperative effort with nuclear regulatory body is needed for early completion of license renewal rules and regulations. For economic evaluation of plant lifetime extension, a computer program was developed and used. It was found that 10 to 20 year of extension operation of Kori-1 nuclear power plant was proved. Based on the results, next phase of plant lifetime management program for detailed lifetime evaluation and presenting detailed implementation schedule for plant refurbishment for lifetime extension should be followed. (author). 74 refs., figs.

  6. Washoe Tribe Alternative Energy Feasibility Study Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Jennifer [Washoe Tribe of NV and CA

    2014-10-01

    The Washoe Tribe of Nevada and California was awarded funding to complete the Washoe Tribe Alternative Energy Feasibility Study project. The main goal of the project was to complete an alternative energy feasibility study. This study was completed to evaluate “the potential for development of a variety of renewable energy projects and to conduct an alternative energy feasibility study that determines which alternative energy resources have the greatest economic opportunity for the Tribe, while respecting cultural and environmental values” (Baker-Tilly, 2014). The study concluded that distributed generation solar projects are the best option for renewable energy development and asset ownership for the Washoe Tribe. Concentrating solar projects, utility scale wind projects, geothermal, and biomass resource projects were also evaluated during the study and it was determined that these alternatives would not be feasible at this time.

  7. Do feasibility studies contribute to, or avoid, waste in research?

    Science.gov (United States)

    Morgan, Ben; Hejdenberg, Jennie; Hinrichs-Krapels, Saba; Armstrong, David

    2018-01-01

    In the context of avoiding research waste, the conduct of a feasibility study before a clinical trial should reduce the risk that further resources will be committed to a trial that is likely to 'fail'. However, there is little evidence indicating whether feasibility studies add to or reduce waste in research. Feasibility studies funded by the National Institute for Health Research's (NIHR) Research for Patient Benefit (RfPB) programme were examined to determine how many had published their findings, how many had applied for further funding for a full trial and the timeframe in which both of these occurred. A total of 120 feasibility studies which had closed by May 2016 were identified and each Principal Investigator (PI) was sent a questionnaire of which 89 responses were received and deemed suitable for analysis. Based on self reported answers from the PIs a total of 57 feasibility studies were judged as feasible, 20 were judged not feasible and for 12 it was judged as uncertain whether a full trial was feasible. The RfPB programme had spent approximately £19.5m on the 89 feasibility studies of which 16 further studies had been subsequently funded to a total of £16.8m. The 20 feasibility studies which were judged as not feasible potentially saved up to approximately £20m of further research funding which would likely to have not completed successfully. The average RfPB feasibility study took 31 months (range 18 to 48) to complete and cost £219,048 (range £72,031 to £326,830) and the average full trial funded from an RfPB feasibility study took 42 months (range 26 to 55) to complete and cost £1,163,996 (range £321,403 to £2,099,813). The average timeframe of feasibility study and full trial was 72 months (range 56 to 91), however in addition to this time an average of 10 months (range -7 to 29) was taken between the end of the feasibility study and the application for the full trial, and a further average of 18 months (range 13 to 28) between the

  8. Feasibility studies to improve plant availability and reduce total installed cost in IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Kevin [General Electric Company, Houston, TX (United States); Anasti, William [General Electric Company, Houston, TX (United States); Fang, Yichuan [General Electric Company, Houston, TX (United States); Subramanyan, Karthik [General Electric Company, Houston, TX (United States); Leininger, Tom [General Electric Company, Houston, TX (United States); Zemsky, Christine [General Electric Company, Houston, TX (United States)

    2015-03-30

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6 – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.

  9. A study of critical paths for feasibility studies of mining projects

    International Nuclear Information System (INIS)

    Sayadi, R.

    2002-01-01

    This work develops a model for design and realisation of profitability's and feasibility studies of a mining project. The model provides the structure of various necessary procedures to establish the feasibility studies and presents a logical system of task sequencing and information circulating between tasks. The specifications of mining projects, particularly their duration, complexity and high costs, necessitate design and realisation of feasibility study bases on the sufficient understanding of task behaviour and the critical path method view. For this purpose, critical paths with the highest frequency of occurrence were studied through several simulations. In addition, the critical tasks and sub tasks with the most probability were identified. The model introduced in this paper can serve as a perfect tool in feasibility study of a mining project. It can also be used as a basis of future development of mining software

  10. White Earth Biomass/Biogas Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Triplett, Michael

    2015-03-12

    The White Earth Nation examined the feasibility of cost savings and fossil energy reduction through the installation of biogas/biomass boiler at the tribal casino. The study rejected biogas options due to availability and site constraints, but found a favorable environment for technical and financial feasibility of installing a 5 MMBtu hot water boiler system to offset 60-70 percent of current fuel oil and propane usage.

  11. A feasibility study for a manufacturing technology deployment center

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-31

    The Automation & Robotics Research Institute (ARRI) and the Texas Engineering Extension Service (TEEX) were funded by the U.S. Department of Energy to determine the feasibility of a regional industrial technology institute to be located at the Superconducting Super Collider (SSC) Central Facility in Waxahachie, Texas. In response to this opportunity, ARRI and TEEX teamed with the DOE Kansas City Plant (managed by Allied Signal, Inc.), Los Alamos National Laboratory (managed by the University of California), Vought Aircraft Company, National Center for Manufacturing Sciences (NCMS), SSC Laboratory, KPMG Peat Marwick, Dallas County Community College, Navarro Community College, Texas Department of Commerce (TDOC), Texas Manufacturing Assistance Center (TMAC), Oklahoma Center for the Advancement of Science and Technology, Arkansas Science and Technology Authority, Louisiana Productivity Center, and the NASA Mid-Continent Technology Transfer Center (MCTTC) to develop a series of options, perform the feasibility analysis and secure industrial reviews of the selected concepts. The final report for this study is presented in three sections: Executive Summary, Business Plan, and Technical Plan. The results from the analysis of the proposed concept support the recommendation of creating a regional technology alliance formed by the states of Texas, New Mexico, Oklahoma, Arkansas and Louisiana through the conversion of the SSC Central facility into a Manufacturing Technology Deployment Center (MTDC).

  12. Feasibility Study on the Development of 2-channel Embedded Infrared Fiber-optic Sensor for Thermometry of Secondary Water System in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Yoo, W. J.; Jang, K. W.; Seo, J. K.; Moon, J.; Han, K. T.; Lee, B.; Park, B. G.

    2011-01-01

    Any warm object by measuring the emitted infrared (IR) radiation. The radiometers using infrared optical fibers are based on the relationship between the temperature of a heat source and the quality and the quantity of an IR radiation. To measure physical properties including a temperature, optical fiber-based sensor has many advantages, such as small size, low cost, high resolution, remote sensing and immunity to electromagnetic radiation over conventional electrical sensors. In this study, we carried out the feasibility study on the development of an embedded IR fiber-optic sensor for thermometry of the secondary water system in a nuclear power plant. The 2-channel embedded fiberoptic temperature sensor was fabricated using two identical IR optical fibers for accurate thermometry without complicated calibration processes. To decide accurate temperature of the water, we measured the difference between the IR radiations emitted from the two temperature sensing probes according to the temperature variation of the water

  13. Feasibility assessment of whey-based ethanol facilities

    Energy Technology Data Exchange (ETDEWEB)

    Walker, L P; Pellerin, R A; Rao, A M; Hang, Y D; Kalter, R J; Boisvert, R N; Gabler, E C

    1985-07-01

    In the U.S., corn has been the principal commodity considered for conversion to ethanol. One alternative to using corn and other food crops is to utilize organic wastes, such as food processing waste. Cheese whey is one such waste that holds potential for conversion to ethanol. To ascertain the feasibility of using whey as a feedstock a series of regional studies were conducted by the authors. Results from these studies indicate that the transport of condensed whey to a central processing plant for conversion to ethanol is economically feasible. The energy balance for the plants considered can yield a positive or negative balance depending on whether an energy penalty is assigned for condensing the whey. A net energy gain of 23833 to 26921 kJ/l of ethanol was obtained if energy for whey condensing was not included and a net energy loss ranging from -279 to -686 kJ/l was obtained if whey condensing was included in the energy balance. Plants utilizing continuous fermentation technology showed positive energy balance with or without a penalty for the condensing of the whey.

  14. Tuna cannery energy conservation interventions: Technical/economic feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Florio, G. (Calabria Univ. Arcavacata di Rende (Italy). Dipt. di Meccanica)

    An energy audit was conducted on a 230,000 can (x 80 g)/day tuna cannery to determine where technically and economically feasible energy savings interventions could be made. The plant is equipped with an oil fired boiler which supplies steam for cooking and sterilization purposes. In the energy/cost analysis, it was found that the most significant and cost effective energy savings could be obtained by the substitution of the four sterilization chambers with three sets of twin sterilization/heat exchange chambers.

  15. Updated (BP3) Technical and Economic Feasibility Study - Electrochemical Membrane for Carbon Dioxide Capture and Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Ghezel-Ayagh, Hossein

    2016-10-12

    This topical report summarizes the results of an updated Technical & Economic Feasibility Study (T&EFS) which was conducted in Budget Period 3 of the project to evaluate the performance and cost of the Electrochemical Membrane (ECM)-based CO2 capture system. The ECM technology is derived from commercially available inorganic membranes; the same used in FuelCell Energy’s commercial fuel cell power plants and sold under the trade name Direct FuelCell® (DFC®). The ECM stacks are utilized in the Combined Electric Power (generation) And Carbon dioxide Separation (CEPACS) systems which can be deployed as add-ons to conventional power plants (Pulverized Coal, Combined Cycle, etc.) or industrial facilities to simultaneously produce power while capturing >90% of the CO2 from the flue gas. In this study, an ECM-based CEPACS plant was designed to capture and compress >90% of the CO2 (for sequestration or beneficial use) from the flue gas of a reference 550 MW (nominal, net AC) Pulverized Coal (PC) Rankine Cycle (Subcritical steam) power plant. ECM performance was updated based on bench scale ECM stack test results. The system process simulations were performed to generate the CEPACS plant performance estimates. The performance assessment included estimation of the parasitic power consumption for CO2 capture and compression, and the efficiency impact on the PC plant. While the ECM-based CEPACS system for the 550 MW PC plant captures 90% of CO2 from the flue gas, it generates additional (net AC) power after compensating for the auxiliary power requirements of CO2 capture and compression. An equipment list, ECM stacks packaging design, and CEPACS plant layout were developed to facilitate the economic analysis. Vendor quotes were also solicited. The economic feasibility study included estimation of CEPACS plant capital cost, cost of electricity (COE) analyses and estimation of cost per ton of CO2 captured. The incremental COE for the ECM-based CO2 capture is expected to meet

  16. Identification of seismically risk-sensitive systems and components in nuclear power plants: feasibility study

    International Nuclear Information System (INIS)

    Azarm, M.; Boccio, J.; Farahzad, P.

    1983-06-01

    An approach for the identification of risk-sensitive components in a nuclear power plant during and after a seismic event is described. Application of the methodology to two hypothetical power plants - a Boiling Water Reactor and a Pressurized Water Reactor - are presented and the results are given in tabular and graphical form. Conclusions drawn and lessons learned through the course of this study, based on the relative importance of various accident scenarios and sensitivity analyses, are discussed. In addition, the areas that may need further investigation are identified

  17. Studies on environment safety and application of advanced reactor for inland nuclear power plants

    International Nuclear Information System (INIS)

    Wei, L.; Jie, L.

    2014-01-01

    To study environment safety assessment of inland nuclear power plants (NPPs), the impact of environment safety under the normal operation was researched and the environment risk of serious accidents was analyzed. Moreover, the requirements and relevant provisions of site selection between international nuclear power plant and China's are comparatively studied. The conclusion was that the environment safety assessment of inland and coastal nuclear power plant have no essential difference; the advanced reactor can meet with high criteria of environment safety of inland nuclear power plants. In this way, China is safe and feasible to develop inland nuclear power plant. China's inland nuclear power plants will be as big market for advanced reactor. (author)

  18. Pre-feasibility study for an electric power plant based on rice straw. [Mali

    Energy Technology Data Exchange (ETDEWEB)

    Fock, F. [Ea Energy Analysis, Copenhagen (Denmark); Nygaard, I. [Technical Univ. of Denmark. DTU Management Engineering, UNEP Risoe Centre on Energy, Climate and Sustainable Development, Roskilde (Denmark); Maiga, A.; Kone, B.; Kamissoko, F.; Coulibaly, N.; Ouattara, O.

    2012-11-15

    The main objective is to make a first evaluation regarding if it's technically possible, economically viable, sustainable and recommendable to build a rice straw/hulls fired power plant in Niono in Mali. Based on the available resource of rice straw and the possibilities for connecting to the grid it has been chosen to analyse a 5 MW power plant in the project. For technical reasons the rice straw should be the main fuel, but rice hulls can be used for co-firing. Up to around 20% of the fuel in the plant can be rice hulls instead of rice straw. A number of different biomass power production technologies have been evaluated in the project. This includes: 1) Grate fired boiler. 2) Bubbling fluidised bed. 3) Circulating fluidised bed. 4) Dust fired boiler. 5) Gasification. 6) Stirling engine. 7) Organic Rankine Cycle. Grate firing is the most relevant technology in this case, due to the fuel, the size of the power plant, the demand for electricity only and not heat, the demand for a robust and well proven technology. For a grate fired plant a calculation of the thermodynamic process of the power plant has been carried out in order to determine the electrical efficiency of the plant. The case consists of a 5 MW grate fired power plant with steam turbines and air cooled condenser resulting in an efficiency of 24.6% at full load (20% as yearly average). Investment costs and costs for O and M have been assumed based on experience from Danish power plants but adjusted for local conditions in Mali. The costs for collecting and transporting the rice straw and for the ash disposal have been specifically estimated in this project. The average cost of capital has been estimated based on assumptions on equity, international loans and local loans/bank finance. Based on the investment, the cost of O and M, fuel, ash disposal and the financial assumptions, a cash flow analysis is made in order to calculate the power price resulting in a Net Present Value (NPV) of the

  19. Human reliability data bank: feasibility study

    International Nuclear Information System (INIS)

    Comer, K.; Miller, D.P.; Donovan, M.

    1984-01-01

    The US Nuclear Regulatory Commission and Sandia National Laboratories have been developing a plan for a human reliability data bank since August 1981. This research is in response to the data needs of the nuclear power industry's probabilistic risk assessment community. The three phases of the program are to: (A) develop the data bank concept, (B) develop an implementation plan and conduct a feasibility study, and (C) assist a sponsor in implementing the data bank. The program is now in Phase B. This paper describes the methods used in the feasibility study. Decisions to be made in the future regarding full-scale implementation will be based, in part, on the outcome of this study. 3 references, 2 figures

  20. Public summaries of feasibility studies conducted for the trinidad LNG project. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The study, conducted by The M. W. Kellog Company, was funded by the U.S. Trade and Development Agency on behalf of the National Gas Company of Trinidad and Tobago. It shows the results of Project Definition Phase which was implemented as a follow-up to two previous feasibility studies which were conducted for a LNG plant in Trinidad. The objective of this report is to develop a project design basis and implementation plan plus a cost estimate. The study is divided into the following sections: (1) Introduction; (2) Project Design Basis; (3) Seismic Hazard Assessment; (4) Geotechnical; and (5) Environmental Assessment.

  1. Feasibility study on environmental improvement and energy conservation of a mercury/diaphram cell chlor-alkali plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In relation to facilities of Azerchimia, state concern, in Sumgait City, Azerbaijan, an investigational study was conducted of the project for energy conservation and greenhouse effect gas emission reduction by converting the caustic soda plant from the mercury process to the ion exchange process. The facilities of Azerchimia are badly superannuated and consume much more electric power than those in the newest technology. Moreover, the soil pollution by the plant using the mercury process is becoming a big problem. By carrying out this project, energy conservation can be achieved by reducing the amount of purchased power from thermal power plants outside. As a result of the study, the amount of the fuel used at the power plant was reduced to 40,700 toe/y. And, the amount of greenhouse effect gas emission was reduced to 131,000 t-CO2/y. In the study of the profitability, the internal earning rate of investment after tax was 8.6% and the internal earning rate of fund was 40% in the case of soft loans. In the case of commercial loans, however, they were 8.6% and 9.4%, respectively, which indicated that the materialization of the project was low. (NEDO)

  2. Feasibility study on the guided wave technique for condenser tube in NPP

    International Nuclear Information System (INIS)

    Choi, Sung Nam; Kim, Young Ho; Kim, Hyung Nam; Yoo, Hyun Joo; Hwang, W. G.

    2004-01-01

    The condenser tube is examined by the eddy current test (ECT) method to identify the integrity of the nuclear power plant. Because ECT probe is moved through the tube inside to identify flaws, the ECT probe should be exchanged periodically due to the wear of probe surface in order to remove the noise form the ECT signal. Moreover, it is impossible to examine the tube by ECT method because the ECT probe can not move through the inside due to the deformation such as dent. Recently, the theory of guided wave was established and the equipment applying the theory has been actively developed so as to overcome the limitation of ECT method for the tube inspection of heater exchanger in nuclear power plant. The object of this study is to know the feasibility of applying the guided wave technique to condenser tube in NPP

  3. Developing Major Steps for a Feasibility Study for Upgrading I and C Systems in a Large Scale for an Operating Nuclear Power Plant

    International Nuclear Information System (INIS)

    Suh, Yong Suk; Keum, Jong Yong; Kim, Dong Hoon; Kang, Hyeon Tae; Sung, Chan Ho; Lee, Jae Ki; Cho, Chang Hwan

    2009-01-01

    According to the IAEA report as of Jan. 2008, 436 nuclear power reactors are in operation over the world and 368 nuclear power reactors exceed their operating ages by 20 years. The average I and C equipment's life span is 20 years comparing with that the average reactor's life time is 40 to 60 years. This means that a reactor must be faced with I and C equipment obsolescence problems once or twice during its operating years. The I and C equipment is replaced with new equipment only when the obsolescence problem occurs in a nuclear power plant. This is called an equipment basis upgrade in this paper. This replacement is such a general practice that occurs only when needed. We can assume that most of I and C equipment of a plant will meet with the obsolescence problem almost same time since it started operating. Although there must be a little time difference in the occurrence of the problems among I and C equipment, the replacement will be required in consecutive years. With this assumption, it is recommendable to upgrade the equipment, which is to meet with the problem at the same time, with new equipment at the same time. This is called a system basis upgrade in this paper. The system-basis replacement can be achieved in a large scale by coupling systems whose functions are related each other and replacing them together with a new upto- date platform. This paper focuses on the large scale upgrade of I and C systems for existing and operating NPPs. While performing a feasibility study for the large scale upgrade for Korea standard nuclear power plants (KSNPs), six major steps are developed for the study. This paper is to present what to perform in each step

  4. The feasibility of co-firing biomass for electricity in Missouri

    International Nuclear Information System (INIS)

    Liu, Zuoming; Altman, Ira; Johnson, Thomas G.

    2014-01-01

    Bioenergy is one of the most significant energy resources with potential to serve as a partial replacement for fossil. As an agricultural state, Missouri has great potential to use biomass for energy production. In 2008, Missouri adopted a renewable portfolio standard (RPS) yet about 80% of its power supply still comes from coal. This paper describes a feasibility study of co-firing biomass in existing coal-powered plants in Missouri. Specifically, this study developed a linear programming model and simulated six scenarios to assess the economic feasibility and greenhouse gas impacts of co-firing biomass in existing qualified coal power plants in Missouri. The results of this study indicate that although co-firing can reduce the emissions of GHG and environmental pollutants, it is still not an economically feasible option for power generation without additional economic or policy incentives or regulations which could take environmental costs into account. Based on these results, strategies and policies to promote the utilization of biomass and to increase its competitiveness with fossil fuels are identified and discussed. - Highlights: • This paper reports on a study of the economic feasibility and environmental effects of co-firing biomass for electricity. • The feasibility of co-firing biomass varies by location depending on local availability of biomass and size of facility. • We apply a linear optimization model that generates economic and environmental indicators for each of several locations. • This paper will appeal to power generators, academic researchers and consultants interested in the feasibility of biopower

  5. Opportunity study and a business plan for a wind power plant

    International Nuclear Information System (INIS)

    Nikolov, Marjan; Naumov, Risto

    2006-01-01

    This paper provides illustration of opportunity study and a business plan for utilizing the wind renewable resource for electricity production in Macedonia. The study is prepared under UNIDO recommendations for feasibility studies (see [1]) and following the IAS, by Marjan Nikolov and Risto Naumov. This is a project simulation for a small wind farm comprising 3 power plant units. We use price list from 'Proven Engineering Products Ltd' UK.

  6. Feasibility and Pilot Studies in Palliative Care Research: A Systematic Review.

    Science.gov (United States)

    Jones, Terry A; Olds, Timothy S; Currow, David C; Williams, Marie T

    2017-07-01

    Feasibility and pilot study designs are common in palliative care research. Finding standard guidelines on the structure and reporting of these study types is difficult. In feasibility and pilot studies in palliative care research, to determine 1) how commonly a priori feasibility are criteria reported and whether results are subsequently reported against these criteria? and 2) how commonly are participants' views on acceptability of burden of the study protocol assessed? Four databases (OVID Medline, EMBASE, CINAHL, and PubMed via caresearch.com.au.) were searched. Search terms included palliative care, terminal care, advance care planning, hospice, pilot, feasibility, with a publication date between January 1, 2012 and December 31, 2013. Articles were selected and appraised by two independent reviewers. Fifty-six feasibility and/or pilot studies were included in this review. Only three studies had clear a priori criteria to measure success. Sixteen studies reported participant acceptability or burden with measures. Forty-eight studies concluded feasibility. The terms "feasibility" and "pilot" are used synonymously in palliative care research when describing studies that test for feasibility. Few studies in palliative care research outline clear criteria for success. The assessment of participant acceptability and burden is uncommon. A gold standard for feasibility study design in palliative care research that includes both clear criteria for success and testing of the study protocol for participant acceptability and burden is needed. Such a standard would assist with consistency in the design, conduct and reporting of feasibility and pilot studies. Copyright © 2017 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.

  7. Feasibility study on use of virtual collaborator for remote NPP control

    International Nuclear Information System (INIS)

    Kim, Jong Hyun; Lee, Seung Jun; Seong, Poong Hyun

    2001-01-01

    In this paper, we study the feasibility of Virtual Collaborator for Remote NPP Control as long-term research theme. And we present similar and related researches that are fulfilled at I and C laboratory in nuclear department of KAIST. Yoshikawa's laboratory, Kyoto University in Japan, is developing 'virtual collaborator', agent robot, which realized in virtual reality. Virtual Collaborator is a new type of human-machine interface which works as 'intelligent interface agent' to help machine operators manipulating large scale machine system such as power plant. The Virtual Collaborator is a sort of 'virtual robot' which behaves as if an intelligent agent robot in virtual space, who can communicate naturally with human like humans do with each other

  8. Updated (BP3) Technical and Economic Feasibility Study - Electrochemical Membrane for Carbon Dioxide Capture and Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Ghezel-Ayagh, Hossein [FuelCell Energy, Inc., Danbury, CT (United States)

    2017-12-21

    This topical report summarizes the results of an updated Technical & Economic Feasibility Study (T&EFS) which was conducted in Budget Period 3 of the project to evaluate the performance and cost of the Electrochemical Membrane (ECM)-based CO2 capture system. The ECM technology is derived from commercially available inorganic membranes; the same used in FuelCell Energy’s commercial fuel cell power plants and sold under the trade name Direct FuelCell® (DFC®). The ECM stacks are utilized in the Combined Electric Power (generation) And Carbon dioxide Separation (CEPACS) systems which can be deployed as add-ons to conventional power plants (Pulverized Coal, Combined Cycle, etc.) or industrial facilities to simultaneously produce power while capturing >90% of the CO2 from the flue gas. In this study, an ECM-based CEPACS plant was designed to capture and compress >90% of the CO2 (for sequestration or beneficial use) from the flue gas of a reference 550 MW (nominal, net AC) Pulverized Coal (PC) Rankine Cycle (Subcritical steam) power plant. ECM performance was updated based on bench scale ECM stack test results. The system process simulations were performed to generate the CEPACS plant performance estimates. The performance assessment included estimation of the parasitic power consumption for CO2 capture and compression, and the efficiency impact on the PC plant. While the ECM-based CEPACS system for the 550 MW PC plant captures 90% of CO2 from the flue gas, it generates additional (net AC) power after compensating for the auxiliary power requirements of CO2 capture and compression. An equipment list, ECM stacks packaging design, and CEPACS plant layout were developed to facilitate the economic analysis. Vendor quotes were also solicited. The economic feasibility study included estimation of CEPACS plant capital cost, cost of electricity (COE) analyses and estimation of cost per ton of CO2

  9. Feasibility study of the commercial production of densified biomass fuel at Klamath Falls, Oregon. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-08-01

    The project began with assessments of local biomass resources which could serve as feedstock for a DBF plant, and the potential customer markets for DBF. Based on these analyses, a pilot densification plant was designed and installed for purposes of trial operations and evaluation. In addition, exploration for geothermal resources was conducted in order to confirm a suitable feedstock dehydration heat source. The results of this exploration, and of the pilot plant's trial operations, were then used to determine requirements for a commercial-scale DBF plant, and the feasibility of upgrading the pilot plant for commercial-scale operations.

  10. General discussion of feasibility study

    International Nuclear Information System (INIS)

    Calori, F.

    1976-01-01

    Fundamentals, objectives and parameters of feasibility studies in the field of nuclear power project planning are discussed in a general way. Technical and economic problems to be considered are pointed out. In special cases, IAEA offers its aid and support. (UA) [de

  11. Feasibility model study for Blumbangreksa product model based on lean startup method

    Science.gov (United States)

    Pakpahan, A. K.; Dewobroto, W. S.; Pratama, R. Y.

    2017-12-01

    Based on the data from Ministry of Maritime Affairs and Fisheries in 2015, the productivity of shrimp farmers in Indonesia is still below China, India and Thailand, because of the low survival rate of shrimp seeds were planted in Indonesia. Water quality factors become a significant factor that increasesthe survival rate of shrimp seeds plantation, therefore team of PT. Atnic EkoteknoWicaksana create a tool called Blumbangreksa that able to monitor water quality of shrimp farms, measure temperature, salinity, pH, DO (dissolved oxygen), TDS (total dissolve solid) in water and moist air over the surface of the water and GSM -based and Internet of things. Based on the research results, unique value proposition of Blumbangreksa products is the measurement result of water quality are accurate, real-time measurements, based on Internet of things and have the ability measurements at once. Based on the feasibility study using the opportunity assessment of Marty Cagan, it can be seen that the product has fulfilled ten elements of assessment opportunity, so Blumbangreksa products are considered feasible. Initial investment fund of Blumbangreksa products is Rp 1,369,856,574, with profitability index of 1:51 and average breakeven products each year as many as 18 products are sold, and the payback period for 4 years and 2 months, therefore the business of Blumbangreksa product is feasible.

  12. Feasibility of a single-purpose reactor plant for district heating in Finland

    International Nuclear Information System (INIS)

    Tarjanne, R.; Vuori, S.; Eerikaeinen, L.; Saukkoriipi, L.

    A feasibility study of a single-purpose reactor for district heating is presented. The reactor chosen is of an ordinary pressurized water reactor type with a thermal output of 100 to 200 MW. Primary circuit steam generators employed in ordinary PWR's are replaced by water-water heat exchangers. For safety reasons an intermediate circuit separates the primary from the network water. The conditions of the district heating systems in Finland were taken into account, which led to the choice of an average temperature of 160 0 C for the reactor coolant and a pressure of 13.5 bar. This, coupled with minimal control requirements helped design a considerably simple reactor plant. On condition, the reactor satisfies the basic heat demand in a district heating system, the effective annual full-power operation time of the heating reactor is from 5000 h to 7000 h. Economic comparisons indicated that the heating reactor may be competitive if the operation period is of this order. As the reactor has to be sited near the heat consumption area for reasons of economy, the safety aspects are of major importance and may in themselves preclude the realization of the heating idea. (author)

  13. A Feasibility Study of Optimal Nuclear Desalination Process for Industrial Water Supply in Korea

    International Nuclear Information System (INIS)

    Park, Hyunchul; Han, Kiin

    2013-01-01

    Seawater Desalination can be an alternative technology for water production based on salt separation from seawater. Seawater desalination can produce freshwater with necessary quality by choosing an appropriate desalination process and posttreatment methods of the product water. The commercial seawater desalination processes which are proven and reliable for large scale freshwater production are MSF and MED for evaporative desalination and RO for membrane desalination. Vapor compression plants based on thermal and mechanical compression are also employed for the small and medium capacity ranges. The aim of this study is to compare the characteristics and cost of each process methods and suggest the most efficient and effective method of desalination for an industrial water supply to the National Industrial Complex nearby Nuclear Power Plant. The costs associated with desalination depend on many factors such as capital, energy, labor, chemicals that are specific to the location, plant capacity, product salinity pre-treatment necessities, and other site-related costs for land, plant and brine disposal. A detailed analysis of each situation is thus required to estimate desalination costs. It could be stated that RO cost is lower than distillation one in energy and environmental terms. The optimal capacity(10,000 m 3 /day) was decided to analyze the estimated water usage in nuclear power plants. And then compared the availability of each process, energy consumption, O and M and economic aspects. In terms of economic feasibility study, RO is the most recommendable process in nuclear power plants in Korea

  14. CHP plant Legionowo Poland. Description of the electricity market in Poland/CHP-feasibility analysis

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-04-01

    In 1997, a new energy law was passed in Poland. An important element of the law is that local energy is made obligatory. The law describes obligatory tasks and procedures for the Polish municipalities related to planning and organisation of the energy sector. With the objective of supporting the Polish municipalities in their obligations according to the energy law, the project 'Energy Planning in Poland at Municipal Level - Support to Decision Makers' was launched. As part of the project, Municipal Guideline Reports have been elaborated for three model municipalities. These guidelines present the basis for energy supply plans in the three municipalities. For the city of Legionowo, the following was recommended: 1. The planning processes initiated during the project should be continued/followed up, 2. Master Plan for the district heating system should be prepared, 3. The possibilities of establishment of a major natural gas-fired CHP plant of the combined cycle type should be investigated. The present report describes the electricity market in Poland, the market in which a CHP plant in Legionowo will have to operate. Furthermore the report presents the results of the feasibility analysis carried out for a new CHP plant in Legionowo. (BA)

  15. A feasibility study on worksite visualization system using augmented reality for Fugen NPP

    International Nuclear Information System (INIS)

    Izumi, Masanori; Shimoda, Hiroshi; Ishii, Hirotake

    2010-01-01

    Fugen Nuclear Power Plant, Advanced Thermal Reactor, was permanently shut down in March 2003 and it is at the decommissioning stage. Decommissioning Engineering Support System, DEXUS, has been developed to help planning of the optimal dismantling process and for carrying out the dismantling work safely and efficiently. Worksite Visualization System (WVS), as part of Dismantling Work Support System of DEXUS, has been developed to support the field workers to deal with the information on the dismantling facilities comprehensibly and intuitively. In this article, outline of the dismantling process of Fugen is first introduced, then a feasibility study on WVS is described. (author)

  16. Technical design aspects of Feasibility Study-II

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2001-01-01

    Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 10 20 neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R and D activities are also described briefly

  17. Feasibility study for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-02-01

    In July 1990, the US Environmental Protection Agency (EPA) directed the Department of Energy Oak Ridge Operations to comply with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements for the remediation of the United Nuclear Corporation (UNC) Disposal Site located at the Y-12 Plant, Oak Ridge, Tennessee. EPA, Waste Management Branch, had approved a closure plan in December 1989 for the UNC Disposal Site. This feasibility study (FS) is a fully satisfy the National Oil and Hazardous Substances Contingency Plan (NCP) requirements for support of the selection of a remedial response for closure of the UNC Disposal Site. For two years the UNC Disposal Site accepted and disposed of waste from the decommissioning of a UNC uranium recovery facility in Wood River Junction, Rhode Island. Between June 1982 and November 1984, the UNC Disposal Site received 11,000 55-gal drums of sludge fixed in cement, 18,000 drums of contaminated soil, and 288 wooden boxes of contaminated building and process demolition materials. The FS assembles a wide range of remedial technologies so the most appropriate actions could be selected to remediate potential contamination to below MCLs and/or to below the maximum level of acceptable risk. Technologies were evaluated based on technical effectiveness, ease of implementation, and costs. Applicable technologies were then selected for alternative development. 33 refs., 9 figs., 27 tabs

  18. A capital cost reduction study on the fast breeder reactor plant

    International Nuclear Information System (INIS)

    Taniyama, H.; Kamei, M.; Moriyama, M.

    1991-01-01

    A capital cost reduction study has been performed for large fast breeder reactor designs. The primary objective of this study is to show a trend of capital cost reduction between FBR plants at the prototype stage, the demonstration stage, and the future commercialization stage. For the FBR plant at the demonstration stage a construction cost comparison with a light water reactor has also been performed, and the target cost of FBR of below 1.5 times that of the light water reactor cost was achieved. To extend the capital cost reduction study, a feasibility study was made to achieve a capital cost of an FBR less than that of a light water reactor. The recommended design is shown as a future commercialization FBR design concept. (author)

  19. Hydroelectric power plant Irape - viability studies; Usina hidroeletrica Irape - estudos de viabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Serran, F.P.; Assumpcao, M.G.

    1994-06-01

    The socio-environmental analysis of the feasibility studies from Irape Hydroelectric Power Plant in Minas Gerais State-Brazil was described including three main questions: the regional insertion mentioning the social conflicts, the social communication program and the basic strategic; the reduction of water volume downstream; the development of programs on the Basic Project Stage.

  20. Wind Turbine and Wind Power Plant Modelling Aspects for Power System Stability Studies

    DEFF Research Database (Denmark)

    Altin, Müfit; Hansen, Anca Daniela; Göksu, Ömer

    2014-01-01

    Large amount of wind power installations introduce modeling challenges for power system operators at both the planning and operational stages of power systems. Depending on the scope of the study, the modeling details of the wind turbine or the wind power plant are required to be different. A wind...... turbine model which is developed for the short-term voltage stability studies can be inaccurate and sufficient for the frequency stability studies. Accordingly, a complete and detailed wind power plant model for every kind of study is not feasible in terms of the computational time and also...... and wind power plants are reviewed for power system stability studies. Important remarks of the models are presented by means of simulations to emphasize the impact of these modelling details on the power system....

  1. Conceptual Thermal Treatment Technologies Feasibility Study

    International Nuclear Information System (INIS)

    Suer, A.

    1996-01-01

    This report presents a conceptual Thermal Treatment Technologies Feasibility Study (FS) for the Savannah River Site (SRS) focusing exclusively on thermal treatment technologies for contaminated soil, sediment, or sludge remediation projects

  2. Estimation of small-scale hydroelectric power plant costs

    International Nuclear Information System (INIS)

    Santos, Afonso Henriques Moreira; Silva, Benedito Claudio da; Magalhaes, Ricardo Nogueira

    2010-01-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  3. A Giant Step for Developing Countries, Lessons Learned from Feasibility Studies

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byoung Youp [Korea Hydro and Nuclear Power, Seoul (Korea, Republic of); Cho, Young Gon [Sanamyung Univ., Seoul (Korea, Republic of)

    2014-05-15

    According to the IAEA(International Atomic Energy Agency, hereinafter 'IAEA') research, the booming trend of nuclear renaissance among developing countries have initiated to investigate economic feasibility studies regarding future electricity demand and supply for the introduction of nuclear power generation in massive volume. Although the ambitious dream of public servants in the third nations who desperately want to instill nuclear power generation capacity promising generation abundance in their homeland, it is not easy to calculate economic benefits and its related costs where lots of blurred areas could not defined in plain terminology. For this reason, IAEA urges the new entrant countries should prepare carefully and design cautiously not to deter large lump sum nuclear power plant construction project. Nuclear power generation in civil area can be seen as righteous peaceful usage of nuclear energy in appropriate manner, although the advanced technology, capital intensive characteristics would hinder for the developing countries to implement proper scheduled ambitious nuclear power projects in timely course. In particular, the complicated economic feasibility studies are major tasks for poverty struck sovereigns to fulfill their ambitions. Thus further detailed design might be requested in order to relieve international concerns on possible military usage. This article is exploring to gauge multiple aspects of peaceful usage of nuclear energy and its economic benefits which allow power huger nations to achieve sustainable development and make significant advancement.

  4. A Neutronic Feasibility Study of an OPR-1000 Core Design with Boron-bearing Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kyung Hoon; Park, Sang Yoon; Lee, Chung Chan; Yang, Yong Sik [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    In Westinghouse plants, boron is mainly used as a form of the integral fuel burnable absorber (IFBA) with a thin coating of zirconium diboride (ZrB{sub 2}) or wet annular burnable absorber (WABA) with a hollow Al{sub 2}O{sub 3}+B{sub 4}C pellet. In OPR-1000, on the other hand, gadolinia is currently employed as a form of an admixture which consists of Gd{sub 2}O{sub 3} of 6∼8 w/o and UO{sub 2} of natural uranium. Recently, boron-bearing UO{sub 2} fuel (BBF) with the high density of greater than 94%TD has been developed by using a low temperature sintering technique. In this paper, the feasibility of replacing conventional gadolinia-bearing UO{sub 2} fuel (GBF) in OPR-1000 with newly developed boron-bearing fuel is evaluated. Neutronic feasibility study to utilize the BBF in OPR-1000 core has been performed. The results show that the OPR-1000 core design with the BBF is feasible and promising in neutronic aspects. Therefore, the use of the BBF in OPR-1000 can reduce the dependency on the rare material such as gadolinium. However, the burnout of the {sup 10}B isotope results in helium gas, so fuel performance related study with respect to helium generation is needed.

  5. Feasibility study on large pool-type LMFBR

    International Nuclear Information System (INIS)

    1984-01-01

    A feasibility study has been conducted from 1981 FY to 1983 FY, in order to evaluate the feasibility of a large pool-type LMFBR under the Japanese seismic design condition and safety design condition, etc. This study was aimed to establish an original reactor structure concept which meets those design conditions especially required in Japan. In the first year, preceding design concepts had been reviewed and several concepts were originated to be suitable to Japan. For typical two of them being selected by preliminary analysis, test programs were planned. In the second year, more than twenty tests with basic models had been conducted under severe conditions, concurrently analytical approaches were promoted. In the last year, larger model tests were conducted and analytical methods have been verified concerning hydrodynamic effects on structure vibration, thermo-hydraulic behaviours in reactor plena and so on. Finally the reactor structure concepts for a large pool-type LMFBR have been acknowledged to be feasible in Japan. (author)

  6. Dual-gated cardiac PET-clinical feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Teraes, Mika; Kokki, Tommi; Noponen, Tommi; Hoppela, Erika; Sipilae, Hannu T.; Knuuti, Juhani [Turku PET Centre, PO BOX 52, Turku (Finland); Durand-Schaefer, Nicolas [General Electric Medical Systems, Buc (France); Pietilae, Mikko [Turku University Hospital, Department of Internal Medicine, Turku (Finland); Kiss, Jan [Turku University Hospital, Department of Surgery, Turku (Finland)

    2010-03-15

    Both respiratory and cardiac motions reduce image quality in myocardial imaging. For accurate imaging of small structures such as vulnerable coronary plaques, simultaneous cardiac and respiratory gating is warranted. This study tests the feasibility of a recently developed robust method for cardiac-respiratory gating. List-mode data with triggers from respiratory and cardiac cycles are rearranged into dual-gated segments and reconstructed with standard algorithms of a commercial PET/CT scanner. Cardiac gates were defined as three fixed phases and one variable diastolic phase. Chest motion was measured with a respiratory gating device and post-processed to determine gates. Preservation of quantification in dual-gated images was tested with an IEC whole-body phantom. Minipig and human studies were performed to evaluate the feasibility of the method. In minipig studies, a coronary catheter with radioactive tip was guided in coronary artery for in vivo and ex vivo acquisitions. Dual gating in humans with suspected cardiac disorders was performed using 18-F-FDG as a tracer. The method was found feasible for in vivo imaging and the radioactive catheter tip was better resolved in gated images. In human studies, the dual gating was found feasible and easy for clinical routine. Maximal movement of myocardial surface in cranio-caudal direction was over 20 mm. The shape of myocardium was clearly different between the gates and papillary muscles become more visible in diastolic images. The first clinical experiences using robust cardiac-respiratory dual gating are encouraging. Further testing in larger clinical populations using tracers designed especially for plaque imaging is warranted. (orig.)

  7. Dual-gated cardiac PET-clinical feasibility study

    International Nuclear Information System (INIS)

    Teraes, Mika; Kokki, Tommi; Noponen, Tommi; Hoppela, Erika; Sipilae, Hannu T.; Knuuti, Juhani; Durand-Schaefer, Nicolas; Pietilae, Mikko; Kiss, Jan

    2010-01-01

    Both respiratory and cardiac motions reduce image quality in myocardial imaging. For accurate imaging of small structures such as vulnerable coronary plaques, simultaneous cardiac and respiratory gating is warranted. This study tests the feasibility of a recently developed robust method for cardiac-respiratory gating. List-mode data with triggers from respiratory and cardiac cycles are rearranged into dual-gated segments and reconstructed with standard algorithms of a commercial PET/CT scanner. Cardiac gates were defined as three fixed phases and one variable diastolic phase. Chest motion was measured with a respiratory gating device and post-processed to determine gates. Preservation of quantification in dual-gated images was tested with an IEC whole-body phantom. Minipig and human studies were performed to evaluate the feasibility of the method. In minipig studies, a coronary catheter with radioactive tip was guided in coronary artery for in vivo and ex vivo acquisitions. Dual gating in humans with suspected cardiac disorders was performed using 18-F-FDG as a tracer. The method was found feasible for in vivo imaging and the radioactive catheter tip was better resolved in gated images. In human studies, the dual gating was found feasible and easy for clinical routine. Maximal movement of myocardial surface in cranio-caudal direction was over 20 mm. The shape of myocardium was clearly different between the gates and papillary muscles become more visible in diastolic images. The first clinical experiences using robust cardiac-respiratory dual gating are encouraging. Further testing in larger clinical populations using tracers designed especially for plaque imaging is warranted. (orig.)

  8. Development of an experimental approach to study coupled soil-plant-atmosphere processes using plant analogs

    Science.gov (United States)

    Trautz, Andrew C.; Illangasekare, Tissa H.; Rodriguez-Iturbe, Ignacio; Heck, Katharina; Helmig, Rainer

    2017-04-01

    The atmosphere, soils, and vegetation near the land-atmosphere interface are in a state of continuous dynamic interaction via a myriad of complex interrelated feedback processes which collectively, remain poorly understood. Studying the fundamental nature and dynamics of such processes in atmospheric, ecological, and/or hydrological contexts in the field setting presents many challenges; current experimental approaches are an important factor given a general lack of control and high measurement uncertainty. In an effort to address these issues and reduce overall complexity, new experimental design considerations (two-dimensional intermediate-scale coupled wind tunnel-synthetic aquifer testing using synthetic plants) for studying soil-plant-atmosphere continuum soil moisture dynamics are introduced and tested in this study. Validation of these experimental considerations, particularly the adoption of synthetic plants, is required prior to their application in future research. A comparison of three experiments with bare soil surfaces or transplanted with a Stargazer lily/limestone block was used to evaluate the feasibility of the proposed approaches. Results demonstrate that coupled wind tunnel-porous media experimentation, used to simulate field conditions, reduces complexity, and enhances control while allowing fine spatial-temporal resolution measurements to be made using state-of-the-art technologies. Synthetic plants further help reduce system complexity (e.g., airflow) while preserving the basic hydrodynamic functions of plants (e.g., water uptake and transpiration). The trends and distributions of key measured atmospheric and subsurface spatial and temporal variables (e.g., soil moisture, relative humidity, temperature, air velocity) were comparable, showing that synthetic plants can be used as simple, idealized, nonbiological analogs for living vegetation in fundamental hydrodynamic studies.

  9. Feasibility Study: New Knowledge Demands in Turbulent Business World

    Science.gov (United States)

    Sprice, Renate; Kirikova, Marite

    Feasibility study is one of the early activities in information systems (IS) development when important decisions regarding choice among several possible systems development alternatives are to be made. In times of relatively stable business environment and waterfall model as a systems development approach, the role and methods of feasibility study where quite clear (Kendall and Kendall 1995). However, new software development methods and the necessity to develop more rapidly new IS or their parts may. challenge the possibility to evaluate project feasibility in the early stages of IS development.

  10. Natural uranium fueled light water moderated breeding hybrid power reactors: a feasibility study

    International Nuclear Information System (INIS)

    Greenspan, E.; Schneider, A.; Misolovin, A.; Gilai, D.; Levin, P.

    1978-06-01

    The first part of the study consists of a thorough investigation of the properties of subcritical thermal lattices for hybrid reactor applications. Light water is found to be the best moderator for (fuel-self-sufficient) FSS hybrid reactors for power generation. Several lattice geometries and compositions of particular promise for LWHRs are identified. Using one of these lattices, fueled with natural uranium, the performance of several concepts of LWHR blankets is investigated, and optimal blanket designs are identified. The effect of blanket coverage efficiency and the feasibility of separating the functions of tritium breeding and of power generation to different blankets are investigated. Optimal iron-water shields for LWHRs are also determined. The performance of generic types of LWHRs is evaluated. The evolution of the blanket properties with burnup is evaluated and fuel management schemes are briefly examined. The feasibility of using the lithium system of the blanket to control the blanket power amplitude and shape is also investigated. A parametric study of the energy balance of LWHR power plants is carried out, and performance parameters expected from LWHRs are estimated. Discussions are given of special features of LWHRs and their fuel cycle

  11. Feasibility Study on Nuclear Propulsion Ship according to Economic Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Gil, Youngmi; Yoo, Seongjin; Oh, June; Byun, Yoonchul; Woo, Ilguk [Daewoo Shipbuilding and Marine Engineering Co., Ltd, Seoul (Korea, Republic of); Kim, Jiho; Choi, Suhn [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    The use of nuclear ships has been extending to the icebreaker, the deep-water exploration ship, and the floating nuclear power plant. Prior to developing the new ship, the relevant regulations need to be considered. In this study, we reviewed the nuclear ship-related regulations. In addition, economic value is one of the most important factors which should be considered in the pre-design phase. To evaluate the economics of the nuclear ship, we calculated Capital Expenditure (abbreviated as CAPEX) and Operation Expenditure (abbreviated as OPEX) for various types of ships. We reviewed the nuclear ship-related regulations and evaluated the economics of the nuclear ship compared to the diesel ship. The calculation result shows that economic feasibility of the nuclear ship depends on the oil price as well as the cost of the nuclear reactor.

  12. Congeneration feasibility: Otis Elevator Company and Polychrome Corporation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Fox, H.

    1982-05-01

    This report summarizes an investigation of the technical and economic feasibility of cogenerating electric and thermal power at two manufacturing plants (Otis Elevator Company and Polychrome Corporation) located on neighboring properties in Yonkers, NY. Existing electrical- and steam-producing equipment and energy consumption date are summarized. Alternative cases examined include electrical energy generation, electrical energy generation with waste heat recovery and a combined cycle case. Also reported are life cycle cost economic evaluations including simple payback period and return-on-investment indices. While it was concluded that cogeneration of heat and electricity at these industrial plant sites would not be economically viable, this detailed study provides valuable insight into the types of problems encountered when considering cogeneration feasibility.

  13. COLD-SAT feasibility study safety analysis

    Science.gov (United States)

    Mchenry, Steven T.; Yost, James M.

    1991-01-01

    The Cryogenic On-orbit Liquid Depot-Storage, Acquisition, and Transfer (COLD-SAT) satellite presents some unique safety issues. The feasibility study conducted at NASA-Lewis desired a systems safety program that would be involved from the initial design in order to eliminate and/or control the inherent hazards. Because of this, a hazards analysis method was needed that: (1) identified issues that needed to be addressed for a feasibility assessment; and (2) identified all potential hazards that would need to be controlled and/or eliminated during the detailed design phases. The developed analysis method is presented as well as the results generated for the COLD-SAT system.

  14. A feasibility study of municipal solid waste incineration fly ash utilisation in Estonia.

    Science.gov (United States)

    Berber, Hakan; Frey, Ruedi; Voronova, Viktoria; Koroljova, Arina

    2017-09-01

    The purpose of this paper is to discuss the alternative environmental management options for the utilisation of municipal solid waste (MSW) incineration fly ash (FA), which is generated at Iru Power Plant where MSW is incinerated in Estonia. To determine sustainable and economically feasible environmental management options for MSW incineration FA in Estonia, CO 2 sequestration with a further carbonation process was examined. A partial Cost & Benefit Analysis has been conducted to compare the carbonation process to the current situation. Two carbonation options were developed. Option 1 is to use carbonated FA in any other processes based on the waste-to-product principle. Option 2 is to send carbonated FA to the non-hazardous landfill in Tallinn, Estonia. Important parameters, such as Net Present Value (NPV), Internal Rate of Return (IRR), Benefit-Cost Ratio (BCR) and Break Even Point (BEP), have been calculated for carbonation options and the current case. In addition, a sensitivity analysis has been conducted to examine its robustness. The results showed that the best option is carbonation Option 1 with NPV of 9,209,662 EUR, IRR of 43%, BCR of 2.63 and BEP between 2018 and 2019. Both Options 1 and 2 constitute more sustainable and environmentally friendly management options compared to the current situation. It can be concluded that this preliminary feasibility study showed that running a carbonation plant may be profitable and sustainable for Estonia. Currently, there is no treatment technology for MSW incineration FA in Estonia and FA is sent to a neighbouring country for further utilisation. This is the first study to demonstrate FA management options with economic and environmental benefits.

  15. Novel, cost-effective configurations of combined power plants for small-scale cogeneration from biomass: Feasibility study and performance optimization

    International Nuclear Information System (INIS)

    Amirante, Riccardo; Tamburrano, Paolo

    2015-01-01

    Highlights: • A cheap small combined cycle for cogeneration from biomass is proposed. • An optimization procedure is utilized to explore its potential. • Two configurations employing two different heat exchangers are considered. • The maximum electrical efficiency is 25%, the maximum overall efficiency is 70%. • The operation in load following mode is effective for both configurations. - Abstract: The aim of this paper is to demonstrate that, thanks to recent advances in designing micro steam expanders and gas to gas heat exchangers, the use of small combined cycles for simultaneous generation of heat and power from the external combustion of solid biomass and low quality biofuels is feasible. In particular, a novel typology of combined cycle that has the potential both to be cost-effective and to achieve a high level of efficiency is presented. In the small combined cycle proposed, a commercially available micro-steam turbine is utilized as the steam expander of the bottoming cycle, while the conventional microturbine of the topping cycle is replaced by a cheaper automotive turbocharger. The feasibility, reliability and availability of the required mechanical and thermal components are thoroughly investigated. In order to explore the potential of such a novel typology of power plant, an optimization procedure, based on a genetic algorithm combined with a computing code, is utilized to analyze the trade-off between the maximization of the electrical efficiency and the maximization of the thermal efficiency. Two design optimizations are performed: the first one makes use of the innovative “Immersed Particle Heat Exchanger”, whilst a nickel alloy heat exchanger is used in the other one. After selecting the optimum combination of the design parameters, the operation in load following mode is also assessed for both configurations

  16. Feasibility study of green wastes composting with digested and dewatering sludge from municipal wastewater treatment plant in Iran

    Directory of Open Access Journals (Sweden)

    Neamat Jaafarzadeh Haghighi Fard

    2015-09-01

    Full Text Available Background: Composting as a waste management technology is becoming more widespread. The purpose of this study was to assess the feasibility and to find the most effective composting process for the ratio of green waste, digested and dewatered sludge from Chonibieh wastewater treatment plant in the west region of Ahvaz. Methods: The composting time was 23 days and the evaluated parameters in this period of the study were organic carbon, total nitrogen, phosphorus, carbon to nitrogen ratio (C/N, moisture content and pH. The C/N ratio was maintained at 30 with weight:weight ratio of 1:1, 1:2, 1:3 (digested and dewatered sludge to green waste. Results: It was observed that vessel R3 produced higher quality of compost with final total nitrogen (1.28%, final total phosphorus (0.71%, final total organic carbon (TOC (25.78% and C/N (20.65% within the 23 days of composting. While vessel R1 produced higher final total nitrogen and total phosphorus with lower amount of total coliform indicating suitable quality of composting. Therefore, the results showed that the characteristics of dewatered sludge mixed with green waste proportion of green waste significantly influenced the compost quality and process dynamics. The results also showed that the quality of final products in all the conditions was in agreement with Global Organic Textile Standard (GOTS and World Health Organization (WHO guidelines. However, the moisture content ratios were lower than the mentioned guidelines. With regards to microbial quality, all three ratios were in agreement with US Environmental Protection Agency (EPA and Iranian guidelines. Conclusion: It is suggested that the final product of composting can be safely used in farmland and green space.

  17. Feasibility Study on The Modulization of Structure and System Facility for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, K.S. [Korea Electric Power Research Institute, Taejon (Korea)

    2002-07-01

    This final report is a results of Study on applicable to SC(Steel Concrete) structure for NPPS and experimentation of SC wall-Support joint carried out by KEPRI from 2001.7.1 to 2000.3.27. The major objectives is to study on application of SC structure and behavior of SC wall-support joint. This result is applicable to plan a main project for ''Development of Modular Construction System in the Nuclear Power Plant''. (author). 45 refs., 19 figs., 23 tabs.

  18. Kvanefjeld refinery pilot plant operations

    International Nuclear Information System (INIS)

    Krebs, Damien; Furfaro, Domenic

    2016-01-01

    Greenland Minerals and Energy is a junior project development company which is listed on the Australian Stock Exchange (asx:GGG). It is developing the Kvanefjeld rare earth and uranium project located in the southern tip of Greenland. The project has completed a Feasibility Study and is currently in the permitting phase. Last year was a busy time for the company as it completed a Feasibility Study, a mining licence application (draft submitted in December 2015) and pilot plant operations. Beneficiation pilot plant operations were completed at GTK in Finland in April 2015. This pilot plant treated approximately 30 tonnes of ore to producing almost 2 tonnes of rare earth mineral concentrate. Later in the year a hydrometallurgical pilot plant was performed which mimicked the Refinery process. This pilot plant was performed at Outotec’s Pori Research laboratories in Finland from September till October 2015. The pilot plant treated approximately 200 kilograms of concentrate over 4 split operating campaigns. Each campaign was performed to focus on the performance of a specific part of the refinery flowsheet. This allowed for full operating focus on a single unit operation to ensure that it was operating correctly. The pilot plant operations were quite successful with no major issues with the flowsheet identified through continuous operation. Some fine tuning of conditions was required to ensure adequate removal of impurities was performed with recycle streams incorporated. Overall the leach extractions observed in the pilot plant exceeded the design assumptions in the Feasibility Study. These programs were partially funded by the EURARE program. The EURARE program aims to encourage the sustainable development of European based rare earth projects. This has the goal of allowing Europe to become less reliant on importation of these key raw materials. The professionalism and performance of both GTK and Outotec contributed significantly to the success of the pilot plant

  19. Feasibility Study of Food Waste Co-Digestion at U.S. Army Installations

    Science.gov (United States)

    2017-03-01

    Factors Multiply By To Obtain acres 4,046.873 square meters British thermal units (International Table) 1,055.056 joules cubic feet 0.02831685 cubic...Energy generation for the WWTP is possible via biogas from anaerobic di- gestion (AD) of biosolids fed into the plant. Instead of paying for disposal of...13 4 Feasibility of Co-digestion 4.1 Potential feedstocks The key to sustaining a viable co-digestion operation is obtaining a secure and

  20. A Rock Physics Feasibility Study of the Geothermal Gassum Reservoir, Copenhagen Area, Denmark

    DEFF Research Database (Denmark)

    Bredesen, Kenneth; Dalgaard, Esben Borch; Mathiesen, Anders

    The subsurface of Denmark stores significant amounts of renewable geothermal energy which may contribute to domestic heating for centuries. However, establishing a successful geothermal plant with robust production capacity require reservoirs with sufficient high porosity and permeability. Modern...... quantitative seismic interpretation is a good approach to de-risk prospects and gain reservoir insight, but is so far not widely used for geothermal applications. In this study we perform a rock physics feasibility study as a pre-step towards quantitative seismic interpretation of geothermal reservoirs......, primarily in areas around Copenhagen. The results argue that it may be possible to use AVO and seismic inversion data to distinguish geothermal sandstone reservoirs from surrounding shales and to estimate porosity and permeability. Moreover, this study may represent new possibilities for future rock physics...

  1. Basic survey for joint implementation, etc. Basic feasibility study on energy conservation at Tadeusz Sendzimir Steelworks

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a feasibility study was conducted on the energy conservation at Huta Sendzimir Steelworks in Poland. The study was made on quantity-energy consuming facilities such as blast furnace, sintering plant and steelmaking plant, power plant, by-producing gas, purchased power, etc. Moreover, as to the energy consuming system, surveys were made on the exhaust heat recovery equipment already introduced and energy saving equipment for pig iron/steel making. As a result, it was found out that Huta Sendzimir Steelworks has an ability and experiences for implementation of the energy conservation project with no problems. As methods to save energy in individual production process, the introduction of the following was proposed: pressure recovery turbine of blast furnace, equipment for high temperature stove exhaust heat recovery, sintering cooler exhaust heat recovery, oxygen combustion furnace exhaust gas recovery, etc. By the introduction of these equipment, the reduction amount of greenhouse effect gas emissions per year will be approximately 180,000 ton-CO2. (NEDO)

  2. Feasibility studies to establish at the Kazakhstan Ulba metallurgical plant the manufacturing capability to produce low-enriched uranium certified reference materials

    Energy Technology Data Exchange (ETDEWEB)

    Kuzminski, Jozef [Los Alamos National Laboratory; Nesuhoff, J [NBL; Cratto, P [NBL; Pfennigwerth, G [Y12 NATIONAL SEC. COMPLEX; Mikhailenko, A [ULBA METALLURGICAL PLANT; Maliutina, I [ULBA METALLURGICAL PLANT; Nations, J [GREGG PROTECTION SERVICES

    2009-01-01

    One of the salient features of the transition plan that the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) is presently implementing in the Former Soviet Union countries is the availability of uranium certified reference materials for calibration of nondestructive assay (NDA) measurement equipment. To address this challenge, DOE/NNSA and U.S. national laboratories have focused their cooperative efforts on establishing a reliable source for manufacturing, certifying, and supplying of such standards. The Ulba Metallurgical Plant (UMP), Kazakhstan, which processes large quantities of low-enriched uranium to produce ceramic fuel pellets for nuclear-powered reactors, is well situated to become a key supplier of low-enriched uranium certified reference materials for the country and Central Asia region. We have recently completed Phase I of a feasibility study to establish at UMP capabilities of manufacturing these standards. In this paper we will discuss details of a proposed methodology for uranium down-blending, material selection and characterization, and a proposed methodology of measurement by destructive (DA) and non-destructive (NDA) analysis to form a database for material certification by the competent State authorities in the Republic of Kazakhstan. In addition, we will discuss the prospect for manufacturing of such standards at UMP.

  3. Feasibility study of plutonium recycling in light water reactors

    International Nuclear Information System (INIS)

    Tabuchi, Hideoto

    1979-01-01

    The feasibility of plutonium recycling in light water reactors has been studied by the Agency of Natural Resources and Energy, MITI. As the first step of the feasibility study, it was planned to charge two fuel assemblies, containing uranium-plutonium mixed oxide (MO 2 ), in the core of the Tsuruga nuclear power plant (BWR) for testing. The design of fuel the safety of these fuel and the operating characteristics of these special fuel assemblies were evaluated. The specifications of MO 2 fuel pin and fuel assembly are compared to those of present uranium oxide (UO 2 ) fuel. The weight of fissile plutonium in one MO 2 fuel assembly is 2.22 kg. The characteristics of MO 2 fuel assemblies, such as reactivity, control rod worth and power distribution can be kept similar to UO 2 fuel. The plutonium isotope ratio of the MO 2 fuel is assumed as that obtained in the fuel taken out of the Tokai No. 1 gas cooled reactor. The temperature distribution in the fuel pellets is shown, compared to that of UO 2 fuel. The linear power density is 440 w/cm at the beginning of the fuel life and 360 w/cm after the burn-up of 44,000 Mwd/t. The stress in the cladding tubes of MO 2 fuel is not different from that of UO 2 fuel. The pellet-cladding interaction (PCM1) was analyzed, utilizing the FEM code, FEAST. Concerning the calculation of resonance absorption, the space dependence of thermal neutron spectra and the nuclear behavior of hollow pellets the methods of design calculation were checked up. It was recognized that regarding the nuclear characteristics of MO 2 fuel, no special technical question remains. (Nakai, Y.)

  4. Modeling the Economic Feasibility of Large-Scale Net-Zero Water Management: A Case Study.

    Science.gov (United States)

    Guo, Tianjiao; Englehardt, James D; Fallon, Howard J

      While municipal direct potable water reuse (DPR) has been recommended for consideration by the U.S. National Research Council, it is unclear how to size new closed-loop DPR plants, termed "net-zero water (NZW) plants", to minimize cost and energy demand assuming upgradient water distribution. Based on a recent model optimizing the economics of plant scale for generalized conditions, the authors evaluated the feasibility and optimal scale of NZW plants for treatment capacity expansion in Miami-Dade County, Florida. Local data on population distribution and topography were input to compare projected costs for NZW vs the current plan. Total cost was minimized at a scale of 49 NZW plants for the service population of 671,823. Total unit cost for NZW systems, which mineralize chemical oxygen demand to below normal detection limits, is projected at ~$10.83 / 1000 gal, approximately 13% above the current plan and less than rates reported for several significant U.S. cities.

  5. Feasibility study on development of plate-type heat exchanger for BWR plants

    International Nuclear Information System (INIS)

    Ohyama, Nobuhiro; Suda, Kenichi; Ogata, Hiroshi; Matsuda, Shinichi; Nagasaka, Kazuhiro; Fujii, Toshi; Nozawa, Toshiya; Ishihama, Kiyoshi; Higuchi, Tomokazu

    2004-01-01

    In order to apply plate-type heat exchanger to RCW, TCW and FPC system in BWR plants, heat test and seismic test of RCW system heat exchanger sample were carried out. The results of these tests showed new design plate-type heat exchanger satisfied the fixed pressure resistance and seismic resistance and keep the function. The evaluation method of seismic design was constructed and confirmed by the results of tests. As anti-adhesion measure of marine organism, an ozone-water circulation method, chemical-feed method and combination of circulation of hot water and air bubbling are useful in place of the chlorine feeding method. Application of the plate-type heat exchanger to BWR plant is confirmed by these investigations. The basic principles, structure, characteristics, application limit and reliability are stated. (S.Y.)

  6. Studies on the feasibility of heavy-ion beams for inertial confinement fusion

    International Nuclear Information System (INIS)

    1982-04-01

    This annual report summarizes the scientific results of work carried out in 1981 in the framework of a feasibility study for inertial confinement fusion (ICF) with heavy ion beams. This program, established in autumn 1979 and funded by the German Ministry for Science and Technology, is devoted in a first period until 1984 to the study of fundamental aspects of the field. Its principal aims are the investigation of key problems and the identification of critical issues of the heavy ion ICF concept in the fields of accelerator research, pellet physics, atomic physics, and reactor design. The research is carried out by about ten working groups at various German research centers and universities. In addition, together with a group of the University of Wisconsin a conceptual design study for a reactor plant (HIBALL) has been started in 1980 and was continued 1981. (orig.) [de

  7. Fusion power plant studies in Europe

    International Nuclear Information System (INIS)

    Maisonnier, D.

    2007-01-01

    The European fusion programme is reactor oriented and it is aimed at the successive demonstration of the scientific, the technological and the economic feasibility of fusion power. For a reactor-oriented fusion development programme, it is essential to have a clear idea of the ultimate goal of the programme, namely a series of models of fusion power plants, in order to define the correct strategy and to assess the pertinence of the on-going activities. The European Power Plant Conceptual Study (PPCS) has been a study of conceptual designs for commercial fusion power plants. It focused on five power plant models, named PPCS A, B, AB, C and D, which are illustrative of a wider spectrum of possibilities. They are all based on the tokamak concept and they have approximately the same net electrical power output, 1500 MWe. These span a range from relatively near-term, based on limited technology and plasma physics extrapolations, to an advanced conception. All five PPCS plant models differ substantially from the models that formed the basis of earlier European studies. They also differ from one another, which lead to differences in economic performance and in the details of safety and environmental impacts. The main emphasis of the PPCS was on system integration. Systems analyses were used to produce self-consistent plant parameter sets with approximately optimal economic characteristics for all models. In the PPCS models, the favourable, inherent, features of fusion have been exploited to provide substantial safety and environmental advantages. The broad features of the safety and environmental conclusions of previous studies have been confirmed and demonstrated with increased confidence. The PPCS study highlighted the need for specific design and R and D activities, in addition to those already underway within the European long term R and D programme, as well as the need to clarify the concept of DEMO, the device that will bridge the gap between ITER and the first

  8. Ute Mountain Ute Tribe Community-Scale Solar Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Rapp, Jim [Parametrix; Knight, Tawnie [Ute Mountain Ute Tribe

    2014-01-30

    Parametrix Inc. conducted a feasibility study for the Ute Mountain Ute Tribe to determine whether or not a community-scale solar farm would be feasible for the community. The important part of the study was to find where the best fit for the solar farm could be. In the end, a 3MW community-scale solar farm was found best fit with the location of two hayfield sites.

  9. Istra district heating system. Master plan and feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    This report presents the results of the Feasibility Study of options for improving the efficiency and operating economy of Istra Large-Scale Demonstration Project includes all areas of the town of Istra. However, the Feasibility Study is confined to the five largest adjoining boilers plant areas within the borders of Istra town. The study was conducted from 1999 to 2001 and was based on information collected during this period. The city administration and the district heating company in Istra provided the data. The company RDIEE, Russian Danish Institute for Energy Efficiency, in Istra collected and processed the data under the conduction of Carl Bro a/s in Denmark. The main objectives of the study are to provide the Istra DHC with a number of options for future development of the district heating system based on technical/financial analyses and presenting the best possibilities for improved comfort, operation and business development. More concretely, one or more system improvement scenarios, which can be implemented in the near future as a first step of the recommended medium-term to long-term development, are identified. Another important objective has been to train the specialists of RDIEE in the feasibility study process and to transfer know-how, skills and tools. The model used for this study is adapted to the features and the special problems to be addressed in relation to the Istra district heating system. RDIEE and Istra DHC are thereby provided with a useful tool which may be used for continued study and development after the first phase project has been completed. As usual in the case of input/output models the quality of the results depends very much on the quality of input data. The present report is exclusively based on the consultant's understanding of the provided information. The results and the underlying inputs should be carefully considered before any final decision concerning implementation is taken. Verification of assumptions should also

  10. Feasibility study for CPR1000 incore measurement instrumentation educed from the reactor pressure vessel upper head

    International Nuclear Information System (INIS)

    Guang Jianwei; Liu Qian; Li Wenhong; Duan Yuangang

    2010-01-01

    The article discusses about the feasibility of in-core measurement instrumentation educed from the reactor pressure vessel (RPV) upper head. Incore instrumentation educed from the reactor pressure vessel upper head is one of advanced technology in the third generation nuclear power plant. This technology can reduce the manufacture problem of RPV; decrease the manufacture time effectively. Furthermore, this technology can get rid of the trouble for loss of water caused by many penetrations in the RPV bottom head, can increase security of nuclear power plant. By the description of structure analysis, comparison, maturity for four type incore instrumentation detectors, the incore instrumentation can be educed from RPV upper head, which can increase reactor's security, reduce the manufacture time, decrease group dose in refueling period. The core design ability can be enhanced through this study. (authors)

  11. Report on the project for working out the new energy vision of the Kamoto Town area. Feasibility study; 2001 nendo Kamoto machi chiiki shin energy vision sakutei tou jigyo fijibiriti hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the realization of 'the introduction of biomass of animal manure/garbage,' an important item in 'the new energy vision of the Kamoto Town area (Kumamoto Prefecture),' a feasibility study was conducted. For the resource retrieval of animal manure, etc., only composting is generally conducted. In this project, however, two projects are combinedly conducted: project for producing biogas (main component: methane gas) and liquid fertilizer and project for producing compost. The project pursues the reduction in running cost by self-sufficiency of energy and the environmental preservation by recovery of methane gas. The plant for producing biogas and liquid fertilizer consists of garbage crusher, storage tank, anaerobic fermentation tank and generator. The plant for producing compost consists of solid liquid separator, fermentation tank, agitator and smell remover. In the feasibility study, the following were carried out: study of the establishment of specifications/selection of the necessary conditions for a plant tentatively named the Kamoto Town Biomass Center, study of the proposed site for plant, survey of the financial plan, survey of the operational system, study of the project promotion system, etc. (NEDO)

  12. Investigation of the potential of wind energy applications in the Sct. Petersburg region. Pre-feasibility study report. Phase 1

    International Nuclear Information System (INIS)

    1995-11-01

    It was proposed to initiate an investigation and, if found to be viable, a feasibility study of the possibilities for partly substituting and supplementing the existing nuclear and fossil fuel based energy supply of the St. Petersburg region with environmentally benign wind energy. The feasibility study is expected to lead to one or more pilot projects. The proposal outlines a three-phased project including an investigation, a feasibility study and a full scale demonstration of wind energy in this region. A 4th phase is envisaged, and this will include the large scale introduction of wind energy applications using national and international financing and resulting in increased local production. The report covers the first phase, the investigation which includes data acquisition and desk studies. It is shown that technically exploitable wind potential exists in the St. Petersburg region, that local production of wind turbine equipment will reduce wind turbine costs due to decreased transport costs and lower local salaries, that suitable sites for the demonstration of both grid-connected wind farms and wind-diesel systems have been preliminarily identified and that the demonstration plants investigated have exhibited reasonable economic parameters - IRR in the range of 9 - 15%. But a feasibility study phase (2) including engineering and economic analyses must be carried out in order to reach the necessary detailed understanding of the technical and economic implications of full scale demonstration projects. (EG)

  13. Feasibility study of medical isotope production at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Massey, C.D.; Miller, D.L.; Carson, S.D.

    1995-12-01

    In late 1994, Sandia National Laboratories in Albuquerque, New Mexico, (SNL/NM), was instructed by the Department of Energy (DOE) Isotope Production and Distribution Program (IPDP) to examine the feasibility of producing medically useful radioisotopes using the Annular Core Research Reactor (ACRR) and the Hot Cell Facility (HCF). Los Alamos National Laboratory (LANL) would be expected to supply the targets to be irradiated in the ACRR. The intent of DOE would be to provide a capability to satisfy the North American health care system demand for 99 Mo, the parent of 99m Tc, in the event of an interruption in the current Canadian supply. 99m Tc is used in 70 to 80% of all nuclear medicine procedures in the US. The goal of the SNL/NM study effort is to determine the physical plant capability, infrastructure, and staffing necessary to meet the North American need for 99 Mo and to identify and examine all issues with potential for environmental impact

  14. Disturbance analysis and surveillance system scoping and feasibility system. Final report

    International Nuclear Information System (INIS)

    Dowling, E.F.; Benedict, B.J.; Snidow, N.L.

    1981-05-01

    This report summarizes the results of a disturbance analysis and surveillance system (DASS) scoping and feasibility study conducted by The Babcock and Wilcox Company, Burns and Roe, Incorporated, General Physics Corporation, and Duke Power Company for Sandia Laboratories and the US Department of Energy. The report addresses selection of DASS goals and functions, development of a design concept for a DASS based on monitoring the nuclear plant subsystem functions and states against predetermined targets, and creation of engineering procedures for the design and implementation of a DASS. The validity of the procedures is evaluated based on application to a subset of the DASS functions. It is concluded that the DASS design concept is a feasible, systematic, and modular approach to plant disturbance identification

  15. The Economic Pre-feasibility Study of Madura Nuclear Desalination System

    International Nuclear Information System (INIS)

    Djoko-Birmanto, Moch; Suparman

    2004-01-01

    The feasibility study is needed in the planning of construction of NPPs SMART type coupled with desalination technology of MED tpe to produce clean water in Madura island. One important part of the feasibility study is the economical and financial analysis. The feasibility criteria of nuclear desalination project is analyzed by using the general parameters that is commonly used in evaluating a project, which is Financial Net Present Value (FNPV), Financial Internal Rate of Return (FIRR) and Payback Period. The calculation result shows that with the electricity selling price of 54.17 mills/KWh, for entirely project funded by the foreign loan, local loan and equity, it could be obtained FIRR 12.73 %, FNPV US$ 75.29 million and Payback Period is 8 years. By seeing from the project feasibility criteria, this nuclear desalination project can be feasible and the investment aspect shows that this project is beneficial because the capital return rate is rather high, the benefit in the end of the economic life-time is rather big and the capital payback period is fast. (author)

  16. Feasibility of large volume casting cementation process for intermediate level radioactive waste

    International Nuclear Information System (INIS)

    Chen Zhuying; Chen Baisong; Zeng Jishu; Yu Chengze

    1988-01-01

    The recent tendency of radioactive waste treatment and disposal both in China and abroad is reviewed. The feasibility of the large volume casting cementation process for treating and disposing the intermediate level radioactive waste from spent fuel reprocessing plant in shallow land is assessed on the basis of the analyses of the experimental results (such as formulation study, solidified radioactive waste properties measurement ect.). It can be concluded large volume casting cementation process is a promising, safe and economic process. It is feasible to dispose the intermediate level radioactive waste from reprocessing plant it the disposal site chosen has resonable geological and geographical conditions and some additional effective protection means are taken

  17. Economic feasibility of artificial islands for cluster-siting of offshore energy facilities

    International Nuclear Information System (INIS)

    Baram, M.S.; Spencer, J.; Munson, J.S.

    1977-04-01

    The study presents a general first-order cost feasibility analysis of the artificial island concept and its usefulness for the offshore siting of multiple energy facilities. The results of the study include a recommended method of cost-feasibility assessment; the collection and organization of the most useful information presently available; and a series of conclusions on feasibility for generic comparison purposes. These conclusions can be summarized as follows: (1) artificial islands to the outer bound of the continental shelf are technologically feasible; (2) offshore nuclear power plants appear to be competitive with onshore plants from a cost standpoint; (3) offshore deepwater ports appear to be more economical than proposed onshore deepwater ports, existing facilities or facilities presently under construction; (4) offshore oil refineries, except under special circumstantces, will probably be more costly than onshore counterparts; (5) the cluster-siting of facilities on an artificial island has definite cost-effectiveness potential; (6) a joint public-private financial venture with a strong federal agency lead role appears essential for the multi-facility island concept to be realized; and (7) artificial island siting of energy complexes appears to be a concept worth pursuing in terms of further site and facility-specific research, and possibly in terms of a demonstration project

  18. Characterization of bottom ashes from coal pulverized power plants to determine their potential use feasibility

    International Nuclear Information System (INIS)

    Menendez, E.; Alvaro, A. M.; Argiz, C.; Parra, J. L.; Moragues, A.

    2013-01-01

    The disposal of coal by products represents environmental and economical problems around the world. Therefore, the reuse and valorisation of this waste has become an important issue in the last decades. While high-value construction products containing fly ash were developed and its use is actually totally accepted as an addition to cement, the use of the bottom ash as supplementary cementitious material has not been allow. This paper examines the chemical and physical properties of fly ashes and bottom ashes from two different coal power plants in order to compare them and analyse the potential feasibility of bottom ash as cement replacement. The mechanical properties of cement mortars made with different percentages of both ashes were also study. The results obtained showed similar chemical composition of both kinds of ashes. The compressive strength values of mortars with 10 % and 25 % of cement replacement (at 28 days) were above the limits established in European standards and there were not significant differences between fly ash and bottom ash from both origins. (Author)

  19. Technical study report on reprocessing systems. The report of the feasibility study on commercialized FR cycle systems (phase I)

    International Nuclear Information System (INIS)

    Tanaka, Hiroshi; Kawamura, Fumio; Kakehi, Isao

    2001-04-01

    As a part of the feasibility study (FS) on commercialized fast reactor (FR) cycle systems started on July 1999, the design studies and the technical assessments for various advanced reprocessing systems have been carried out. In this study, plant design for the advanced aqueous system and the three non-aqueous systems (oxide electrowinning method, metal electrorefining method, and fluoride volatility method) has been carried out, and each system has been evaluated mainly from the viewpoint of economics. The future R and D issues on the processes and systems have been also clarified. This report describes the results of the study for two years as final report of FS phase I. (1) The advanced aqueous system, based on the simplified PUREX process, has been shown to be much more economical than the conventional PUREX. The 200 tHM/y plant achieves the target of economics, but the 50 tHM/y plant can not achieve the target. (2) The promising alternative systems replaced for advanced aqueous are the supercritical fluid direct extraction method and amine extraction method from the economical viewpoint. The ion exchange method is promising as the process for minor actinide recovery. (3) For reprocessing MOX fuel, all non-aqueous plants with a capacity of 200 tHM/y achieve the economical target. For such a small capacity as 50 tHM/y, further rationalization of the process is required for the oxide electrowinning method and metal electrorefining method to attain the target, though they are more economical than the advanced aqueous system. (4) For metallic and nitride fuel reprocessing, a metal electrorefining system has been shown to be advantageous. (author)

  20. Feasibility study on tandem fuel cycle

    International Nuclear Information System (INIS)

    Han, P.S.; Suh, I.S.; Rim, C.S.; Kim, B.K.; Suh, K.S.; Ro, S.K.; Juhn, P.I.; Kim, S.Y.

    1983-01-01

    The objective of this feasibility study is to review and assess the current state of technology concerning the tandem fuel cycle. Based on the results from this study, a long-term development plan suitable for Korea has been proposed for this cycle, i.e., the PWR → CANDU tandem fuel cycle which used plutonium and uranium, recovered from spent PWR fuel by co-processing, as fuel material for CANDU reactors. (Author)

  1. Responses to comments on the remedial investigation/feasibility study-environmental impact statement for remedial action at the Chemical Plant area of the Weldon Spring site (November 1992)

    International Nuclear Information System (INIS)

    1993-06-01

    The US Department of Energy (DOE) is responsible for cleanup activities at the Weldon Spring site in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry; both areas are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced by the US Army at the chemical plant in the 1940s, and uranium and thorium materials were processed by DOE's predecessor agency in the 1950s and 1960s. During that time, various wastes were disposed of at both areas of the site. The DOE is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The integrated remedial investigation/feasibility study-environmental impact statement (RI/FS-EIS) documents for the chemical plant area were issued to the public in November 1992 as the draft RI/FS-EIS. (The CERCLA RI/FS is considered final when issued to the public, whereas per the NEPA process, an EIS is initially issued as a draft and is finalized after substantive public comments have been addressed.) Four documents made up the draft RI/FS-EIS, which is hereafter referred to as the RI/FS-EIS: (1) the RI (DOE 1992d), which presents general information on the site environment and the nature and extent of contamination; (2) the baseline assessment (BA) (DOE 1992a), which evaluates human health and environmental effects that might occur if no cleanup actions were taken; (3) the FS (DOE 1992b), which develops and evaluates alternatives for site cleanup; and (4) the proposed plan (PP) (DOE 1992c), which summarizes key information from the RI, BA, and FS reports and identifies DOE's preferred alternative for remedial action. This comment response document combined with those four documents constitutes the final RI/FS-EIS for the chemical plant area

  2. Responses to comments on the remedial investigation/feasibility study-environmental impact statement for remedial action at the Chemical Plant area of the Weldon Spring site (November 1992)

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    The US Department of Energy (DOE) is responsible for cleanup activities at the Weldon Spring site in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry; both areas are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced by the US Army at the chemical plant in the 1940s, and uranium and thorium materials were processed by DOE`s predecessor agency in the 1950s and 1960s. During that time, various wastes were disposed of at both areas of the site. The DOE is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The integrated remedial investigation/feasibility study-environmental impact statement (RI/FS-EIS) documents for the chemical plant area were issued to the public in November 1992 as the draft RI/FS-EIS. (The CERCLA RI/FS is considered final when issued to the public, whereas per the NEPA process, an EIS is initially issued as a draft and is finalized after substantive public comments have been addressed.) Four documents made up the draft RI/FS-EIS, which is hereafter referred to as the RI/FS-EIS: (1) the RI (DOE 1992d), which presents general information on the site environment and the nature and extent of contamination; (2) the baseline assessment (BA) (DOE 1992a), which evaluates human health and environmental effects that might occur if no cleanup actions were taken; (3) the FS (DOE 1992b), which develops and evaluates alternatives for site cleanup; and (4) the proposed plan (PP) (DOE 1992c), which summarizes key information from the RI, BA, and FS reports and identifies DOE`s preferred alternative for remedial action. This comment response document combined with those four documents constitutes the final RI/FS-EIS for the chemical plant area.

  3. A study on thimble plug removal for PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Song, Dong Soo; Lee, Chang Sup; Lee, Jae Yong; Jun, Hwang Yong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    The thermal-hydraulic effects of removing the RCC guide thimble plugs are evaluated for 8 Westinghouse type PWR plants in Korea as a part of feasibility study: core outlet loss coefficient, thimble bypass flow, and best estimate flow. It is resulted that the best estimate thimble bypass flow increases about by 2% and the best estimate flow increases approximately by 1.2%. The resulting DNBR penalties can be covered with the current DNBR margin. Accident analyses are also investigated that the dropped rod transient is shown to be limiting and relatively sensitive to bypass flow variation. 8 refs., 5 tabs. (Author)

  4. A study on thimble plug removal for PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Song, Dong Soo; Lee, Chang Sup; Lee, Jae Yong; Jun, Hwang Yong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    The thermal-hydraulic effects of removing the RCC guide thimble plugs are evaluated for 8 Westinghouse type PWR plants in Korea as a part of feasibility study: core outlet loss coefficient, thimble bypass flow, and best estimate flow. It is resulted that the best estimate thimble bypass flow increases about by 2% and the best estimate flow increases approximately by 1.2%. The resulting DNBR penalties can be covered with the current DNBR margin. Accident analyses are also investigated that the dropped rod transient is shown to be limiting and relatively sensitive to bypass flow variation. 8 refs., 5 tabs. (Author)

  5. Estudio de viabilidad económica de una central termosolar de 50 MW con y sin almacenamiento térmico = Economic feasibility study in a cylindrical-parabolic solar thermal plant of 50 MW with and without thermal storage

    Directory of Open Access Journals (Sweden)

    Pedro José Soto Piedehierro

    2016-06-01

    Full Text Available Este articulo trata sobre el estudio de viabilidad económica de una central termosolar cilíndrico-parabólica de 50 MW en el término municipal de Badajoz. Para ver las diferentes alternativas en el diseño y estudio económico de la instalación se han tenido en cuenta dos casos, un primer caso de la central sin almacenamiento térmico y un segundo caso de la central con almacenamiento térmico. La finalidad con la que se presenta este estudio es analizar los diferentes casos y presentar conclusiones al respecto. The aim of this study is to do an economic feasibility study in a cylindrical-parabolic solar thermal plant of 50 MW in Badajoz. Two different cases have been studied, first case the solar thermal plant without thermal storage and the other case, the solar thermal plant with thermal storage (salt tanks. The advantages and disadvantages of the use of each element have also been analyzed.

  6. Impact on CCGT plants of the use of decarbonised syngas from coal gasification - a retrofit study

    Energy Technology Data Exchange (ETDEWEB)

    James, S.; Goy, C.; Periselneris, J. [E.ON UK, Nottingham (United Kingdom). Power Technology

    2006-07-01

    This paper describes a feasibility study of the modification of an existing combined cycle gas turbine (CCGT) unit to fire on a coal-derived syngas, both with and without pre-combustion carbon capture. It includes plant reliability study and the estimation of capital and operating costs for the converted unit. 6 refs., 3 figs., 2 tabs.

  7. Feasibility of tidal power development in the Bay of Fundy

    Energy Technology Data Exchange (ETDEWEB)

    1969-01-01

    A committee was formed to carry out technical studies on the feasibility of a tidal power plant in the Bay of Fundy. Basic information was collected on the physical, geological, climatic, and tidal characteristics of the area to determine areas for more intense investigation. Studies were conducted on the possible effects of the plant on navigation, ground transportation, fisheries, and area development. Electric power marketing and transmission were also examined, as well as the basic concepts for extracting tidal energy. A number of potential sites were examined, and the three most promising sites were selected for preliminary design and cost estimates. Computerized models were used at appropriate stages in order to evaluate various tidal power schemes. This report presents a summary of the committee's investigations. It was seen that a site at the entrance to Cobequid Bay would have an economic advantage over the other sites considered. From the results of the design studies, it was concluded that a long period of construction, plus extensive capital investment, would be required. However, the lowest unit cost of output was calculated at 5.6 mills/kWh, substantially above the incremental cost of energy available from existing sources. Under current economic conditions, the tidal power plant would not be feasible. 4 figs., 1 tab.

  8. A Feasibility study of a mining business

    Directory of Open Access Journals (Sweden)

    Cehlár Michal

    2001-06-01

    Full Text Available The economic evaluation of a project requires a great deal of diverse information to be brought together in one place. The greatest concern is that there will be an error by omission, so it is useful to have a detailed list of what one needs to know in order to make a thorough evaluation.There are various of detail required at the different stages of evaluation in the project, from the "quick and dirty" overview to the pre-feasibility study, through a full detailed feasibility study, to a due diligence review. This list addresses most of the economic variables in project and can be used at all levels of studies. Its purpose is to identify a variable or issue and to raise a question, which the review can pursue in more detail using an increasingly more comprehensive checklist for each topic. While developed from the point of view of a new project, this list is equally valid for an ongoing operation.A feasibility study is defined as an assessment of all aspects of a project including technical, infrastructural, environmental, social, legislative and commercial factors, which is sufficiently detailed to support a decision on the implementation. Each project has an associated level of risk. For a proposed investment to increase the value of a firm's stock, it should have a higher expected rate of return than shareholders require for assuming that risk. Since investors demand for a higher potential returns from a riskier project, the cost of capital depends on the venture's risk.

  9. Study on modular technology based on the reference nuclear power plant

    International Nuclear Information System (INIS)

    Lu Qinwu; Zhao Shuyu; Li Yi; Han Xiaoping; Chai Weidong; Zhang Shuxia

    2014-01-01

    As an important technology for shortening the construction period and reducing the cost of nuclear power project, modular technology has become one of the development orientations of the third generation nuclear power plant. Taking CPR1000 nuclear power reactor as reference plant and drawing on advanced foreign technology of modularization, the overall concept design has been completed with the help of the self-developed 3D modular design system. On this basis, a typical detailed design work has been carried out so as to verify the feasibility of technology. Besides, an analysis on implementation of modular technology has been made from two aspects (procurement and construction), and the feasibility of research results in actual project has been evaluated. It provides references for the promotion of self-reliant modular technology in nuclear power project in China. (authors)

  10. Feasibility of geothermal heat use in the San Bernardino Municipal Wastewater Treatment Plant. Final report, September 1980-June 1981

    Energy Technology Data Exchange (ETDEWEB)

    Racine, W.C.; Larson, T.C.; Stewart, C.A.; Wessel, H.B.

    1981-06-01

    A system was developed for utilizing nearby low temperature geothermal energy to heat two high-rate primary anaerobic digesters at the San Bernardino Wastewater Treatment Plant. The geothermal fluid would replace the methane currently burned to fuel the digesters. A summary of the work accomplished on the feasibility study is presented. The design and operation of the facility are examined and potentially viable applications selected for additional study. Results of these investigations and system descriptions and equipment specifications for utilizing geothermal energy in the selected processes are presented. The economic analyses conducted on the six engineering design cases are discussed. The environmental setting of the project and an analysis of the environmental impacts that will result from construction and operation of the geothermal heating system are discussed. A Resource Development Plan describes the steps that the San Bernardino Municipal Water Department could follow in order to utilize the resource. A preliminary well program and rough cost estimates for the production and injection wells also are included. The Water Department is provided with a program and schedule for implementing a geothermal system to serve the wastewater treatment plant. Regulatory, financial, and legal issues that will impact the project are presented in the Appendix. An outline of a Public Awareness Program is included.

  11. Use of complex electronic equipment within radiative areas of PWR power plants: feability study

    International Nuclear Information System (INIS)

    Fremont, P.; Carquet, M.

    1988-01-01

    EDF has undertaken a study in order to evaluate the technical and economical feasibility of using complex electronic equipment within radiative areas of PWR power plants. This study lies on tests of VLSI components (Random Access Memories) under gamma rays irradiations, which aims are to evaluate the radiation dose that they can withstand and to develop a selection method. 125 rad/h and 16 rad/h tests results are given [fr

  12. MacMillan Pier Transportation Center Feasibility Study.

    Science.gov (United States)

    2006-06-01

    The MacMillan Pier Transportation Center Feasibility Study examines two potential sites (landside and waterside) for a transportation center that provides a range of tourist and traveler information. It would serve as a gateway for Provincetown and t...

  13. Feasibility study for siting of a deep repository within the Storuman municipality

    International Nuclear Information System (INIS)

    1995-01-01

    It is SKB's task to gather a broad body of information for the siting of a deep repository for Sweden's spent nuclear fuel and other long-lived radioactive waste. The criteria presented by SKB serve as guidelines for the siting studies. Overviews of siting factors are compiled in general siting studies of all or parts of Sweden. Feasibility studies examine the siting prospects in potentially suitable and interested municipalities. SKB plans to carry out feasibility studies in five to ten municipalities in different parts of the country. General studies and feasibility studies are primarily based on existing material. The feasibility study in Storuman is the first to be conducted. It began during the second half of 1993 with the conclusion of an agreement between the municipality and SKB. SKB has been in charge of the execution of the feasibility study. SKB has been responsible for the summary provided in a status report published in June 1994, as well as for the conclusions and evaluations in this final report. Altogether about 30 reports have been published within the framework of the feasibility study. The purpose of the various studies have been to describe, in as much detail as possible, the prospects for siting a deep repository in the municipality of Storuman, and to shed light on the possible positive and negative consequences of such a siting. The feasibility study has led to a discussion within the municipality and the region concerning the siting of a deep repository. In SKB's opinion, this gives all those concerned ample opportunity to become acquainted with the issues and to assert their interests and present their viewpoints at an early stage. 55 refs

  14. Three Affliated Tribes Renewable Energy Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Belvin Pete; Kent Good; Krista Gordon; Ed McCarthy,

    2006-05-26

    The Three Affliated Tribes on the Fort Berthold Reservation studied the feasibility of a commercial wind facility on land selected and owned by the Tribes and examined the potential for the development of renewable energy resources on Tribal Lands.

  15. Studies on Plant Population and Stand Establishment Techniques for Increasing Productivity of Rice in Dera Ismail Khan, Pakistan

    Directory of Open Access Journals (Sweden)

    Mohammad Safdar BALOCH

    2007-06-01

    Full Text Available Rice production in Pakistan is constraint by many factors pertaining to prevalent planting techniques. A research on the feasibility of new planting techniques (direct seeding on flat, transplanting on flat, direct seeding on ridges, transplanting on ridges and parachute planting in transplanted and direct wet-seeded rice was undertaken at Dera Ismail Khan region of Pakistan's North West Frontier Province during 2002 and 2003. Among the planting techniques, the best performance for the yield formation and economic evaluation was noted for transplanting on flat during both years. Chinese parachute planting technology also showed very promising results in most of the parameters. Direct seeding on ridges could not excel transplanting on flat and parachute planting during both cropping seasons. The findings concluded the feasibility of parachute planting technology along with traditional rice transplanting on flat over all other planting techniques being practiced in the area.

  16. Construction feasibility of OTEC platforms. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Brewer, J H; Harwood, P; Solberg, K; Fjeld, S

    1978-12-01

    This study provides an evaluation of the feasibility of constructing either steel or concrete OTEC platforms of both spar and ship shape configurations for a range of platform sizes with respect to existing, developed shipyard or fabrication yard facilities that are currently active in marine vessel construction within the US. This brief study is quite broad in scope. Many parameters, including plant size; vessel type, size, configuration, and dimensions; position of heat exchangers; existing construction facility size, geographic location, and potential for modification; and, availability of undeveloped deep water construction sites affect the conclusions drawn. Nevertheless, the conclusions should remain valid and not change significantly, unless there are major changes in either vessel size or US construction capabilities. The various concepts are ranked in order of their feasibility and practicality of construction in existing or modified existing facilities and new facilities.

  17. The feasibility study on fuel types for the KALIMER

    International Nuclear Information System (INIS)

    Hwang, W.; Nam, C.; Yim, J. S.; Na, B. C.; Hahn, D. H.; Kim, Y. I.; Kim, Y. C.; Park, C. K.

    1997-08-01

    The economics of LMR is largely dependent on the construction cost of the power plant, and the fuel cycle options usually constitute 20 to 30 % of total electricity generation cost. The choice of fuel cycle technology and the fuel type is important in order to develop a LMR with better economics, performance and safety. The LMR fuel types, whose performances have been proven up to 15 at% burnup, are MOX and IFR metal fuel. The base alloy, binary (U-10% Zr) metal fuel with HT9 is used as structural materials of KALIMER. The design concept of KALIMER fuel has been established through the investigation of technical feasibilities on the fuel and recycle systems for MOX and IFR metal fuel. According to the results of comparative analysis for MOX and metal fuel, metal fuel is better than MOX in view of safety, in-reactor performance, nuclear characteristics, economics and non-proliferation, while MOX fuels have advantages in the developmental status and technical cooperation potential. The overall performance of binary (U-10% Zr) metal fuel with HT9 cladding, which is a potential start-up fuel for KALIMER, is not only superior to that of MOX fuel, but also has enough technical feasibility in its high-burnup performance, safety and economics. (author). 54 ref., 13 tabs., 20 figs

  18. Restoring effective sleep tranquility (REST): A feasibility and pilot study.

    Science.gov (United States)

    Eakman, Aaron M; Schmid, Arlene A; Henry, Kimberly L; Rolle, Natalie R; Schelly, Catherine; Pott, Christine E; Burns, Joshua E

    2017-06-01

    The purpose of this pilot study was to establish the feasibility of completing a future controlled trial of a multi-component cognitive behavioral therapy for insomnia program for military veterans with sleep disturbance. This was a single-arm feasibility and pilot study. Participants were United States post-9/11 veterans with service-connected injuries, university students, and had self-reported sleep disturbances. Restoring Effective Sleep Tranquility was a multi-component cognitive behavioral therapy for insomnia intervention consisting of seven sessions of group therapy and eight 1:1 sessions delivered by occupational therapists. Feasibility and pilot indicators were process, resources, management, and scientific, including pre-post-assessments of sleep difficulties, dysfunctional sleep beliefs, participation, and pain interference. Indicators were supportive of feasibility, including reduced sleep difficulties (for example Medical Outcomes Study Sleep Measure [ t  = 3.29, p  = .02]), reduced nightmares: t  = 2.79, p  = .03; fewer dysfunctional sleep beliefs: t  = 3.63, p  = .01, and greater ability to participate in social roles: t  = -2.86, p  = .03, along with trends towards improved satisfaction with participation and reduced pain interference. The Restoring Effective Sleep Tranquility program may reduce sleep difficulties and improve participation in US veterans with service-connected injuries, and evidence indicates a controlled trial would be feasible to deliver.

  19. Feasibility analysis of micro hydro plant at nawangan village of pacitan district

    Directory of Open Access Journals (Sweden)

    Diana Dellariam Bayu

    2017-12-01

    Full Text Available Nawangan Village of Pacitan District utilizes Kedung Pasang Micro Hydro Plant (MHP as a power source, but the existing electricity power unable suffice the demand so it needs revitalization by calculating the new unit price and debit because of the previous reference already invalid. The problem is that the investment required for the construction of the MHP must provide benefits for a certain period. This study analyzed the ratio of power and energy potential of MHP with changes in pipe diameter and speed of existing turbines, and calculated the cost. The available power is currently at 112.5 kW and energy is 82150.66 kWh. The results of the analysis show that the power increase can be done up to 142,95 kW a year or equivalent 218%, the energy can be done up to 139.427 kWh a year, meanwhile the benefit is Rp44.566.169, increase Rp26.604.588,- from existing condition or equivalent 148,1% which is done by changing the diameter of penstock and the turbine. Economic analysis of Kedung Pasang MHP development plan shows NPV of Rp6.717.110,- that is greater than 0, the value of IRR is 11% greater than the interest rate set by Bank Negara Indonesia 46 of 10,25% and BCR value of 1,19 is greater than 1, thus the revitalization of Kedung Pasang MHP feasible to be implemented.

  20. Studies and research concerning BNFP: spent fuel dry storage studies at the Barnwell Nuclear Fuel Plant

    International Nuclear Information System (INIS)

    Anderson, K.J.

    1980-09-01

    Conceptual designs are presented utilizing the Barnwell Nuclear Fuel Plant for the dry interim storage of spent light water reactor fuel. Studies were conducted to determine feasible approaches to storing spent fuel by methods other than wet pool storage. Fuel that has had an opportunity to cool for several years, or more, after discharge from a reactor is especially adaptable to dry storage since its thermal load is greatly reduced compared to the thermal load immediately following discharge. A thermal analysis was performed to help in determining the feasibility of various spent fuel dry storage concepts. Methods to reject the heat from dry storage are briefly discussed, which include both active and passive cooling systems. The storage modes reviewed include above and below ground caisson-type storage facilities and numerous variations of vault, or hot cell-type, storage facilities

  1. Feasibility study for siting of a deep repository within the Storuman municipality

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    It is SKB`s task to gather a broad body of information for the siting of a deep repository for Sweden`s spent nuclear fuel and other long-lived radioactive waste. The criteria presented by SKB serve as guidelines for the siting studies. Overviews of siting factors are compiled in general siting studies of all or parts of Sweden. Feasibility studies examine the siting prospects in potentially suitable and interested municipalities. SKB plans to carry out feasibility studies in five to ten municipalities in different parts of the country. General studies and feasibility studies are primarily based on existing material. The feasibility study in Storuman is the first to be conducted. It began during the second half of 1993 with the conclusion of an agreement between the municipality and SKB. SKB has been in charge of the execution of the feasibility study. SKB has been responsible for the summary provided in a status report published in June 1994, as well as for the conclusions and evaluations in this final report. Altogether about 30 reports have been published within the framework of the feasibility study. The purpose of the various studies have been to describe, in as much detail as possible, the prospects for siting a deep repository in the municipality of Storuman, and to shed light on the possible positive and negative consequences of such a siting. The feasibility study has led to a discussion within the municipality and the region concerning the siting of a deep repository. In SKB`s opinion, this gives all those concerned ample opportunity to become acquainted with the issues and to assert their interests and present their viewpoints at an early stage. 55 refs.

  2. Feasibility study on consolidation of Fernald Environmental Management Project depleted uranium materials

    International Nuclear Information System (INIS)

    1995-01-01

    In 1991, the DOE made a decision to close the FMPC located in Fernald, Ohio, and end its production mission. The site was renamed FEMP to reflect Fernald's mission change from uranium production to environmental restoration. As a result of this change, the inventory of strategic uranium materials maintained at Fernald by DOE DP will need to be relocated to other DOE sites. Although considered a liability to the Fernald Plant due to its current D and D mission, the FEMP DU represents a potentially valuable DOE resource. Recognizing its value, it may be important for the DOE to consolidate the material at one site and place it in a safe long-term storage condition until a future DOE programmatic requirement materializes. In August 1995, the DOE Office of Nuclear Weapons Management requested, Lockheed Martin Energy Systems (LMES) to assess the feasibility of consolidating the FEMP DU materials at the Oak Ridge Reservation (ORR). This feasibility study examines various phases associated with the consolidation of the FEMP DU at the ORR. If useful short-term applications for the DU fail to materialize, then long-term storage (up to 50 years) would need to be provided. Phases examined in this report include DU material value; potential uses; sampling; packaging and transportation; material control and accountability; environmental, health and safety issues; storage; project management; noneconomic factors; schedule; and cost

  3. Progress of independent feasibility study for modular HTGR demonstration plant to be built in China

    International Nuclear Information System (INIS)

    He Jiachen

    1989-01-01

    Many regions in China are suffering from shortage of energy as a result of the rapid growth of the national economy, for example, the growth rate of national production in 1988 reached 11.2%. A great number of coal fired plants have been built in many industrial areas. However, the difficulties relating to the transportation of coal and environmental pollution have become more and more serious. The construction of hydropower plants is limited due to uneven geographic conditions and seasons. For these reasons China needs to develop nuclear power plants. Nowadays, it has been decided, that PWR will be the main reactor type in our country, but in some districts or under some conditions modular HTGR may have distinct advantages and become an attractive option. The possible plant site description and preliminary result of economic analysis of modular HTGR type reactor are briefly discussed in this presentation

  4. Project to promote the development of global environmental industry technology. Feasibility study of research exchanges; Chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo. Kenkyu koryu kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    In fiscal 1995, three teams were organized to study the following subjects: plant genetic and cellular engineering in relation to drought stress; simulation models of global environment for accurate assessment and prediction; the APEC Virtual Center for environmental technology exchange. The team studying plant genetic and cellular engineering in relation to drought stress visited the Department of Botany, Hebrew University of Jerusalem, Israel, the Jacob Blaustein Institute for Desert Research, Ben-Grunion University, Israel, the Department of Biochemistry and the Office of Arid Lands Studies, Arizona University, the U.S. to survey the present and future trend of the study and feasibility of research exchanges. The team studying simulation models of global environment for accurate assessment and prediction visited Yale University, Massachusetts Institute of Technology, Electric Power Research Institute, and Battle Research Institute in the U.S. to survey feasibility of research exchanges. The team studying the APEC Virtual Center for environmental technology exchange visited institutes in ASEAN countries to survey needs for the Virtual Center. 312 refs., 74 figs., 17 tabs.

  5. A conceptual framework for studying the strength of plant-animal mutualistic interactions.

    Science.gov (United States)

    Vázquez, Diego P; Ramos-Jiliberto, Rodrigo; Urbani, Pasquinell; Valdovinos, Fernanda S

    2015-04-01

    The strength of species interactions influences strongly the structure and dynamics of ecological systems. Thus, quantifying such strength is crucial to understand how species interactions shape communities and ecosystems. Although the concepts and measurement of interaction strength in food webs have received much attention, there has been comparatively little progress in the context of mutualism. We propose a conceptual scheme for studying the strength of plant-animal mutualistic interactions. We first review the interaction strength concepts developed for food webs, and explore how these concepts have been applied to mutualistic interactions. We then outline and explain a conceptual framework for defining ecological effects in plant-animal mutualisms. We give recommendations for measuring interaction strength from data collected in field studies based on a proposed approach for the assessment of interaction strength in plant-animal mutualisms. This approach is conceptually integrative and methodologically feasible, as it focuses on two key variables usually measured in field studies: the frequency of interactions and the fitness components influenced by the interactions. © 2015 John Wiley & Sons Ltd/CNRS.

  6. Small-scale hydro power plant on the main drinking water line La Rippaz in Bex, Switzerland - Feasibility study; Petite centrale hydraulique. Aduction d'eau potable La Rippaz. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Chapallaz, J.-M. [Jean-Marc Chapallaz, Ingenieur EPFL/SIA, Baulmes (Switzerland); Meylan, D. [Perret-Gentil et Rey et Associes SA, Ingenieurs civils et Ingenieurs Conseil EPF/SIA, Lausanne (Switzerland)

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the replacement work of the drinking-water supply line from the location of the spring water collection to a water reservoir belonging to the rock-salt mining company 'Hotel des Salines' in Bex, Switzerland. Built 1887 and following years this water supply system has already been designed for power generation as well. However, a 40 kW micro-scale turbine has only been installed 2005 in the lower part of the water supply system (hydraulic head: 115 m). The new project includes the replacement of the existing piping by a penstock, the construction of a new water collection reservoir at the highest point, the construction of a new 300 kW hydro power plant using the upper part of the water supply system (hydraulic head: 520 m), and some improvements of the existing lower power plant. The available water flow rate lies in the range 57-70 l/s, all the year round. The question arising is whether this construction project could be financed by the benefit from the sale of electricity that could be produced by the two power plants. The authors of the study estimate the power production to be 2.5 kWh/y. If the electricity can be sold at least at CHF 0.20/kWh for 25 years this could finance the whole project that has an estimated cost of CHF 7,000,000.

  7. Case study - Argentina

    International Nuclear Information System (INIS)

    Diaz, E.

    1986-01-01

    Antecedents and experience of nuclear activities in Argentina; the Atomic Energy Commission (CNEA). First development and research activities. Research reactors and radioisotopes plants. Health physics and safety regulations. - Feasibility studies for the first nuclear power plant. Awarding the first plant CNA I (Atucha I). Relevant data related to the different project stages. Plant performance. - Feasibility study for the second nuclear power plant. Awarding the second plant CNE (Central Nuclear Embalse). Relevant data related to established targets. Differences compared with the first station targets. Local participation. Plant performance. (orig./GL)

  8. Technical feasibility and costs of the retention of radionuclides during accidents in nuclear power plants demonstrated by the example of a pressurized water reactor

    International Nuclear Information System (INIS)

    Braun, H.; Grigull, R.; Lahner, K.; Gutowski, H.; Weber, J.

    1985-01-01

    The maximum allowable radiation doses during accidents in nuclear power plants, i.e., 5 rem whole-body dose and 15 rem thyroid dose, have been laid down in the German Radiation Protection Act. In order to ensure that these limits are not exceeded for all exposure paths including the ingestion path or, if possible, to remain far below them, the Federal Ministry of the Interior has initiated a study on the effectiveness and cost of additional safety features for reducing the release of activity and the dose exposure during accidents in nuclear power plants. Detailed investigations were carried out for the following three radiologically representative types of accidents: break of a reactor coolant line, break of an instrument line in one of the outer ring rooms, and break of a main stream line outside the containment. The technical basis of the study was a BBR-type nuclear power plant with pressurized water reactor and once-through steam generator. I-131 was chosen for determining the activity release as this is the critical nuclide for the ingestion path. Altogether 33 feasible technical measures were investigated and their potential improvement was assessed

  9. Technical feasibility study on polycarbonate solar panels

    NARCIS (Netherlands)

    Hackmann, M.M.; Meuwissen, M.H.H.; Bots, T.L.; Buijs, J.A.H.M.; Broek, K.M.; Kinderman, R.; Tanck, O.B.F.; Schuurmans, F.M.

    2004-01-01

    This paper describes a technical feasibility study on the application of polycarbonate (PC) plates in a superstrate photovoltaic module design. The lamination process was performed in a conventional laminator apparatus using low temperature curing (100°C) ethylene-vinyl-acetate (EVA) as the potting

  10. The feasibility and challenges of energy self-sufficient wastewater treatment plants

    International Nuclear Information System (INIS)

    Gu, Yifan; Li, Yue; Li, Xuyao; Luo, Pengzhou; Wang, Hongtao; Robinson, Zoe P.; Wang, Xin; Wu, Jiang; Li, Fengting

    2017-01-01

    Highlights: •Various influencing factors of energy use in WWTPs are characterized. •Benchmark energy consumption in WWTPs in different countries are highlighted. •Energy recovery or saving technologies in WWTPs are summarized. •Recent advances in optimization of energy recovery technologies are highlighted. •Feasibility and challenges of energy self-sufficient WWTPs are explored. -- Abstract: Energy efficiency optimization is crucial for wastewater treatment plants (WWTPs) because of increasing energy costs and concerns about global climate change. Energy efficiency optimization can be achieved through a combination of energy recovery from the wastewater treatment process and energy saving-related technologies. Through these two approaches energy self-sufficiency of WWTPs is achievable, and research is underway to reduce operation costs and energy consumption and to achieve carbon neutrality. In this paper, we analyze energy consumption and recovery in WWTPs and characterize the factors that influence energy use in WWTPs, including treatment techniques, treatment capacities, and regional differences. Recent advances in the optimization of energy recovery technologies and theoretical analysis models for the analysis of different technological solutions are presented. Despite some challenges in implementation, such as technological barriers and high investment costs, particularly in developing countries, this paper highlights the potential for more energy self-sufficient WWTPs to be established in the future.

  11. Feasibility study: Assess the feasibility of siting a monitored retrievable storage facility

    International Nuclear Information System (INIS)

    King, J.W.

    1993-01-01

    The purpose of phase one of this study are: To understand the waste management system and a monitored retrievable storage facility; and to determine whether the applicant has real interest in pursuing the feasibility assessment process. Contents of this report are: Generating electric power; facts about exposure to radiation; handling storage, and transportation techniques; description of a proposed monitored retrievable storage facility; and benefits to be received by host jurisdiction

  12. Feasibility Study for a Hopi Utility-Scale Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Kendrick Lomayestewa

    2011-05-31

    The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. Wind resource assessments were conducted at two study sites on Hopi fee simple lands located south of the city of Winslow. Reports from the study were recently completed and have not been compared to any existing historical wind data nor have they been processed under any wind assessment models to determine the output performance and the project economics of turbines at the wind study sites. Ongoing analysis of the wind data and project modeling will determine the feasibility of a tribal utility-scale wind energy generation.

  13. INTEC High-Level Waste Studies Universal Solvent Extraction Feasibility Study

    International Nuclear Information System (INIS)

    Banaee, J.; Barnes, C.M.; Battisti, T.; Herrmann, S.; Losinski, S.J.; McBride, S.

    2000-01-01

    This report summarizes a feasibility study that has been conducted on the Universal Solvent Extraction (UNEX) Process for treatment and disposal of 4.3 million liters of INEEL sodium-bearing waste located at the Idaho Nuclear Technology and Engineering Center. This feasibility study covers two scenarios of treatment. The first, the UNEX Process, partitions the Cs/Sr from the SBW and creates remote-handled LLW and contact-handled TRU waste forms. Phase one of this study, covered in the 30% review documents, dealt with defining the processes and defining the major unit operations. The second phase of the project, contained in the 60% review, expanded on the application of the UNEX processes and included facility requirements and definitions. Two facility options were investigated for the UNEX process, resulting in a 2 x 2 matrix of process/facility scenarios as follows: Option A, UNEX at Greenfield Facility, Option B, Modified UNEX at Greenfield Facility, Option C, UNEX at NWCF, th is document, covers life-cycle costs for all options presented along with results and conclusions determined from the study

  14. Feasibility studies and pre-design simulation of Warsaw's new wastewater treatment plant.

    Science.gov (United States)

    Oleszkiewicz, J A; Kalinowska, E; Dold, P; Barnard, J L; Bieniowski, M; Ferenc, Z; Jones, R; Rypina, A; Sudol, J

    2004-12-01

    The proposed transfer of wastewater from the western part of Warsaw, across the Wisla (Vistula) River for joint treatment at the existing eastern side "Czajka" wastewater treatment plant (WWTP) will result in combined winter flows of approx. 580,000 m3 d(-1). One-year of pilot-scale studies defined the COD characteristics and kinetics of nitrogen removal and VFA production from primary sludge. BioWin simulation was used to size and price the optional processes and pointed to the Westbank process as the most cost-effective. The process consists of a sequence of a RAS pre-denitrification zone followed by an anaerobic, anoxic and aerobic zone. Some 100-150 t d(-1) of 10% methanol would be needed to remove 2-4 mg l(-1) of NO3-N above the recommended effluent level TN = 10 mg l(-1). Applying the principle of annual average 80% TN removal, and allowing for use of daily composite samples (rather than grab) could annually save the municipality over 1.5 million Euro on external carbon source.

  15. Final Technical Report: Renewable Energy Feasibility Study and Resources Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Rivero, Mariah [BEC Environmental, Inc., Las Vegas, NV (United States)

    2016-02-28

    In March 2011, the U.S. Department of Energy (DOE) awarded White Pine County, Nevada, a grant to assess the feasibility of renewable resource-related economic development activities in the area. The grant project included a public outreach and training component and was to include a demonstration project; however, the demonstration project was not completed due to lack of identification of an entity willing to locate a project in White Pine County. White Pine County completed the assessment of renewable resources and a feasibility study on the potential for a renewable energy-focused economic sector within the County. The feasibility study concluded "all resources studied were present and in sufficient quantity and quality to warrant consideration for development" and there were varying degrees of potential economic impact based on the resource type and project size. The feasibility study and its components were to be used as tools to attract potential developers and other business ventures to the local market. White Pine County also marketed the County’s resources to the renewable energy business community in an effort to develop contracts for demonstration projects. The County also worked to develop partnerships with local educational institutions, including the White Pine County School District, conducted outreach and training for the local community.

  16. A study of feasibility, design and cost of excavations for underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    1976-02-01

    A study conducted for the State Power Board on underground siting of nuclear power plants is presented. The report is divided into two chapters, both concerning the technical aspects of large underground openings. The first chapter gives a brief general survey of the problems involved, and the second outlines the technical aspects of a PWR project at a specific site. Details are given in 8 appendices and arrangement drawings. The project differs from conventional hydroelectric excavation schemes mainly in the fact that the spherical reactor containment requires a vault of 60m free span, and the turbine hall a cylindrical vault of 45m span, both of which exceed any span hitherto built for similar purposes. This requires a comparatively wide extrapolation of tested and available experience in underground excavations for permanent civil use. To what extent and under what circumstances such extrapolation is tenable must be tested in practice, preferably in a specially controlled prototype test. However the study indicates that conventional nuclear power plants can be sited underground when the topography and rock conditions are suitable. A 1000-2000 MW conventional plant adapted for underground siting will require large span caverns, tunnels and shafts, totalling about 1.0 mill. cubic metres of underground excavation. In addition access and cooling water tunnels, depending on the location, will require 0.2-0.5 mill. cubic metres of tunnel excavations. The excavations and support work can be completed within a construction time of about 2 1/2 years at an estimated total cost of 215 mill. Norwegian kroner (1975 value). (JIW)

  17. PV solar system feasibility study

    International Nuclear Information System (INIS)

    Ashhab, Moh’d Sami S.; Kaylani, Hazem; Abdallah, Abdallah

    2013-01-01

    Highlights: ► This research studies the feasibility of PV solar systems. ► The aim is to develop the theory and application of a hybrid system. ► Relevant research topics are reviewed and some of them are discussed in details. ► A prototype of the PV solar system is designed and built. - Abstract: This research studies the feasibility of PV solar systems and aims at developing the theory and application of a hybrid system that utilizes PV solar system and another supporting source of energy to provide affordable heating and air conditioning. Relevant research topics are reviewed and some of them are discussed in details. Solar heating and air conditioning research and technology exist in many developed countries. To date, the used solar energy has been proved to be inefficient. Solar energy is an abundant source of energy in Jordan and the Middle East; with increasing prices of oil this source is becoming more attractive alternative. A good candidate for the other system is absorption. The overall system is designed such that it utilizes solar energy as a main source. When the solar energy becomes insufficient, electricity or diesel source kicks in. A prototype of the PV solar system that operates an air conditioning unit is built and proper measurements are collected through a data logging system. The measured data are plotted and discussed, and conclusions regarding the system performance are extracted.

  18. Conceptual design of krypton recovery plant by porous membrane method

    International Nuclear Information System (INIS)

    Yoshida, Hiroshi; Fujine, Sachio; Shimizu, Toku; Saito, Keiichiro; Ouchi, Misao

    1979-10-01

    A conceptual design of a krypton recovery plant by porous membrane method was made to study feasibility of treating fuel reprocessing off-gas. Specifications of the plant could be clarified, such as off-gas pretreatment system, first cascade system of gaseous diffusion Hertz cascade composed of two-compartment diffusers, storage system, shield and housing and operating conditions. Capital costs and operating costs of the plant were estimated for different operating conditions and cost parameters. Technical and economic feasibility of the method compares favorably with those of the cryogenic distillation or the solvent absorption method. (author)

  19. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  20. PUEBLO OF ZIA RENEWABLE ENERGY DEVELOPMENT FEASIBILITY STUDY

    Energy Technology Data Exchange (ETDEWEB)

    Pino, Peter M. [Tribal Administrator (Ret.), Pueblo of Zia; Lakshman, Jai [Project Manager (NDA) for Pueblo of Zia; Toole, G. Loren [Principal Investigator, Los Alamos National Laboratory - Energy Analysis Team/ CCS-3, D-4; Hand, Dan [P.E., Sustainable Enginerring; Witcher, James; Emerson, Michael A. [Senior V.P., ARES Corporation; Turner, Jeremy [Executive Director, NM Renewable Energy Transmission Authority; Sandidge, Wendy [Director of Operations, NM Community Capital

    2014-06-30

    The Pueblo of Zia will conduct a comprehensive feasibility study for best-use application(s) for development of renewable energy resources on its tribally held TRUST lands (i.e., Trust Lands of Zia Indian Reservation). The feasibility study is essential for determining the technical and economic viability of a future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe. Project Objectives: The feasibility study is essential for determining the technical and economic viability of future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe to: 1. Provide a balanced local renewable power supply for Zia Pueblo, its members, tribal offices, schools and buildings, and businesses on tribal lands 2. Provide a firm power supply for export and commercial market distribution 3. Provide economic development for the Tribe and its members, including job training and creation, each in accordance with the goals and objectives as conveyed by the Pueblo of Zia Tribal Council, Tribal Administration, and outlined in The Pueblo of Zia Comprehensive Plan and Pueblo of Zia — Zia Enterprise Zone Master Plan. A key goal of the study is to analyze the integrated development of solar, geothermal, and wind renewable energy resources at Zia Pueblo, with added potential to combine gas-fired generation to accomplish energy firming. Geothermal offers a base load source of energy, providing power continuously for end users. Wind and solar offer intermediate and peaking sources of energy, which can be harvested throughout the day, with periods of variable but predicable output. Variability will be managed in an integrated manner, using Zia Pueblo's combined renewable resources to generate high-quality power. Tasks are intended to collect, catalog, map, and analyze existing data on Zia Pueblo's renewable energy resource base and then match resource attributes with

  1. Comparative design study of FR plants with various coolants. 1. Studies on Na coolant FR, Pb-Bi coolant FR, gas coolant FR

    International Nuclear Information System (INIS)

    Konomura, Mamoru; Shimakawa, Yoshio; Hori, Toru; Kawasaki, Nobuchika; Enuma, Yasuhiro; Kida, Masanori; Kasai, Shigeo; Ichimiya, Masakazu

    2001-01-01

    In Phase I of the Feasibility Studies on the Commercialized Fast Reactor (FR) Cycle System, plant designs on FR were performed with various coolants. This report describes the plant designs on FR with sodium, lead-bismuth, CO 2 gas and He gas coolants. A construction cost of 0.2 million yen/kWe was set up as a design goal. The result is as follows: The sodium reactor has a capability to obtain the goal, and lead-bismuth and gas reactors may satisfy the goal with further improvements. (author)

  2. Feasibility study on volcanic power generation system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-07-01

    Investigations were carried out to determine the feasibility of volcanic power generation on Satsuma Io Island. Earthquakes were studied, as were the eruptions of subaerial and submarine hot springs. Hydrothermal rock alteration was studied and electrical surveys were made. General geophysical surveying was performed with thermocameras and radiation monitoring equipment. In particular, the Toyoba mine was studied, both with respect to its hot spring and its subsurface temperatures.

  3. Estimation of small-scale hydroelectric power plant costs; Estimacao de custos de PCH

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Silva, Benedito Claudio da [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  4. IPNS upgrade: A feasibility study

    International Nuclear Information System (INIS)

    1995-04-01

    Many of Argonne National Laboratory's (ANL's) scientific staff members were very active in R ampersand D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R ampersand D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL's Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately

  5. IPNS upgrade: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  6. Congeneration feasibility: Otis Elavator Company and Polychrome Corporation

    Science.gov (United States)

    Fox, H.

    1982-05-01

    An investigation of the technical and economic feasibility of cogenerating electric and thermal power at two manufacturing plants (Otis Elevator Company and Polychrome Corporation) located on neighboring properties in Yonkers, NY is discussed. Existing electrical and steam producing equipment and energy consumption date are summarized. Alternative cases examined include electrical energy generation, electrical energy generation with waste heat recovery and a combined cycle case. Also reported are life cycle cost economic evaluations including simple payback period and return on investment indices. While it was concluded that cogeneration of heat and electricity at these industrial plant sites would not be economically viable, this detailed study provides valuable insights.

  7. Conducting feasibilities in clinical trials: An investment to ensure a good study

    Directory of Open Access Journals (Sweden)

    Viraj Rajadhyaksha

    2010-01-01

    Full Text Available Conducting clinical trial feasibility is one of the first steps in clinical trial conduct. This process includes assessing internal and environmental capacity, alignment of the clinical trial in terms of study design, dose of investigational product, comparator, patient type, with the local environment and assessing potential of conducting clinical trial in a specific country. A robust feasibility also ensures a realistic assessment and capability to conduct the clinical trial. For local affiliates of pharmaceutical organizations, and contract research organizations, this is a precursor to study placement and influences the decision of study placement. This article provides details on different types of feasibilities, information which is to be included and relevance of each. The article also aims to provide practical hands-on suggestions to make feasibilities more realistic and informative.

  8. Conducting feasibilities in clinical trials: an investment to ensure a good study.

    Science.gov (United States)

    Rajadhyaksha, Viraj

    2010-07-01

    Conducting clinical trial feasibility is one of the first steps in clinical trial conduct. This process includes assessing internal and environmental capacity, alignment of the clinical trial in terms of study design, dose of investigational product, comparator, patient type, with the local environment and assessing potential of conducting clinical trial in a specific country. A robust feasibility also ensures a realistic assessment and capability to conduct the clinical trial. For local affiliates of pharmaceutical organizations, and contract research organizations, this is a precursor to study placement and influences the decision of study placement. This article provides details on different types of feasibilities, information which is to be included and relevance of each. The article also aims to provide practical hands-on suggestions to make feasibilities more realistic and informative.

  9. Economic analysis of power generation from parabolic trough solar thermal plants for the Mediterranean region. A case study for the island of Cyprus

    International Nuclear Information System (INIS)

    Poullikkas, Andreas

    2009-01-01

    In this work a feasibility study is carried out in order to investigate whether the installation of a parabolic trough solar thermal technology for power generation in the Mediterranean region is economically feasible. The case study takes into account the available solar potential for Cyprus, as well as all available data concerning current renewable energy sources policy of the Cyprus Government, including the relevant feed-in tariff. In order to identify the least cost feasible option for the installation of the parabolic trough solar thermal plant a parametric cost-benefit analysis is carried out by varying parameters, such as, parabolic trough solar thermal plant capacity, parabolic trough solar thermal capital investment, operating hours, carbon dioxide emission trading system price, etc. For all above cases the electricity unit cost or benefit before tax, as well as after tax cash flow, net present value, internal rate of return and payback period are calculated. The results indicate that under certain conditions such projects can be profitable. (author)

  10. The economic feasibility of sugar beet biofuel production in central North Dakota

    International Nuclear Information System (INIS)

    Maung, Thein A.; Gustafson, Cole R.

    2011-01-01

    This study examines the financial feasibility of producing ethanol biofuel from sugar beets in central North Dakota. Under the Energy Independence and Security Act (EISA) of 2007, biofuel from sugar beets uniquely qualifies as an 'advanced biofuel'. EISA mandates production of 21 billion gallons of advanced biofuels annually by 2022. A stochastic simulation financial model was calibrated with irrigated sugar beet data from central North Dakota to determine economic feasibility and risks of production for 0.038 hm 3 y -1 (or 10 MGY (Million Gallon per Year) and 0.076 hm 3 y -1 (or 20 MGY) ethanol plants. Study results indicate that feedstock costs, which include sugar beets and beet molasses, account for more than 70 percent of total production expenses. The estimated breakeven ethanol price for the 0.076 hm 3 y -1 plant is $400 m -3 ($1.52 per gallon) and $450 m -3 ($1.71 per gallon) for the 0.038 hm 3 y -1 plant. Breakeven prices for feedstocks are also estimated and show that the 0.076 hm 3 y -1 plant can tolerate greater ethanol and feedstock price risks than the 0.038 hm 3 y -1 plant. Our results also show that one of the most important factors that affect investment success is the price of ethanol. At an ethanol price of $484.21 m -3 ($1.84 per gallon), and assuming other factors remain unchanged, the estimated net present value (NPV) for the 0.076 hm 3 y -1 plant is $41.54 million. By comparison, the estimated NPV for the 0.038 hm 3 y -1 plant is only $8.30 million. Other factors such as changes in prices of co-products and utilities have a relatively minor effect on investment viability. -- Highlights: → Sugar beets and beet molasses costs account for more than 70 percent of total production expenses. → The estimated breakeven ethanol prices for the 0.076 hm 3 y -1 and 0.038 hm 3 y -1 ethanol plants are $400 m -3 and $450 m -3 respectively. → The price of ethanol will be one of the most important factors for determining the future feasibility of a

  11. The use of a social network analysis technique to investigate the characteristics of crew communications in nuclear power plants-A feasibility study

    International Nuclear Information System (INIS)

    Park, Jinkyun

    2011-01-01

    Effective and reliable communications are very important in securing the safety of human-involved large process control systems because human operators have to accomplish their tasks in cooperative ways. This means that it is very important to understand the characteristics of crew communications, which can provide useful insights for preventing inappropriate communications. Unfortunately, in the nuclear industry, a systematic framework that can be used to identify the characteristics of crew communications seems to be rare. For this reason, the applicability of the social network analysis (SNA) technique to identifying the characteristics of crew communications was investigated in this study. To this end, the communication data of operating crews working in the main control room (MCR) of nuclear power plants (NPPs) were collected under two kinds of simulated off-normal conditions. Then the communication characteristics of MCR operating crews, which can be represented by the associated SNA metrics, were compared with communication characteristics that are already known from existing studies. As a result, it was found that SNA metrics could be meaningful for explaining the communication characteristics of MCR operating crews. Accordingly, it is expected that the SNA technique can be used as one of the serviceable tools to investigate the characteristics of crew communications in NPPs. - Highlights: → Communications are very important for the safety of complicated socio-technical systems. → A systematic framework to identify communication characteristics seems to be rare. → The feasibility of the social network analysis (SNA) technique was investigated. → It is expected that SNA metrics is meaningful for explaining communication characteristics.

  12. Feasibility of phytoremediation of common soil and groundwater pollutants

    DEFF Research Database (Denmark)

    Trapp, Stefan; Rein, Arno; Clause, Lauge

    2014-01-01

    This report is the D eliverable D 4.3 and was done within the Timbre project WP4. It introduces into the various clean - up techniques that apply plants, evaluates the feasibility of phytoremediation of common soil and groundwater pollutants, and the knowle dge collected for this purpose was appl......This report is the D eliverable D 4.3 and was done within the Timbre project WP4. It introduces into the various clean - up techniques that apply plants, evaluates the feasibility of phytoremediation of common soil and groundwater pollutants, and the knowle dge collected for this purpose...... was applied to the two Timbre sites : Hunedoara (Romania) and Szprotawa (Poland). Phytoremediation is the technique to clean up (remediate) contaminated sites using plants, typically trees. The principles of the data were deta iled, with focus on obstacles (phytotoxicity) and factors stimulating success...

  13. Report on feasibility study in fiscal 1999. Energy loss reduction project in Myanmar

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on reduction of greenhouse effect gas emission by improving the efficiency of electric power generation facilities and reducing the power transmission loss in Myanmar to link the project to the clean development mechanism. Shwedaung Power Station, Mann Power Station and the transmission system in Mandalay District were taken up as the object of the discussions. Profitability as a result of improving the thermal power generation facilities was calculated as the financial internal rate of return (FIRR) to discuss the feasibility of the implementation of the project. Since the single-shaft gas turbine currently in use has low efficiency, expansion or new installation of the new compound cycle power generation facilities would be most effective providing excellent thermal efficiency and power generation cost efficiency. The FIRR from improving the Shwedaung thermal power plant was calculated as 12.8%, and the Mann power plant as 9.4%, being regarded sufficiently worth for investment. The measures to reduce the transmission loss include introduction of higher voltage, setting new routes, increasing the conductor sizes, enhancing the power factor, and improving the facilities. The economic internal rate of return (EIRR) and the FIRR were calculated to discuss the project feasibility. In case of assuming the subjected analysis period to be ten years, the EIRR was estimated to be 20.41% (exceeding the social discount rate of 10%) and the FIRR to be 17.56% (exceeding the general loan interest of 15%), indicating the project realizable. (NEDO)

  14. Investigation toward laser driven IFE power plant

    International Nuclear Information System (INIS)

    Nakai, S.; Kozaki, Y.; Izawa, Y.

    2001-01-01

    Inertial fusion energy (IFE) is becoming feasible due to the increasing understanding of implosion physics. Reactor technology issues have begun to be developed. Based on the conceptual design of Laser Driven IFE Power Plant, the technical and physical issues have been examined. R and D on key issues that affect the feasibility of power plant have been proceeded taking into account the collaboration in the field of laser driver, fuel pellet, reaction chamber and system design. It is concluded that the technical feasibility of IFE power plant seems to be reasonably high. Coordination and collaboration scheme of reactor technology experts in Japan on Laser Driven IFE Power Plant is being proceeded. (author)

  15. Decommissioning of nuclear facilities: Feasibility, needs and costs

    International Nuclear Information System (INIS)

    DeLaney, E.G.; Mickelson, J.R.

    1985-01-01

    The Nuclear Energy Agency's Working Group on Decommissioning is preparing a study entitled ''Decommissioning of Nuclear Facilities: Feasibility, Needs and Costs.'' The study addresses the economics, technical feasibility and waste management aspects of decommissioning larger commercial reactors and nuclear support facilities. Experience on decommissioning small reactors and fuel cycle facilities shows that current technology is generally adequate. Several major projects that are either underway or planned will demonstrate decommissioning of the larger and more complex facilities. This experience will provide a framework for planning and engineering the decommissioning of the larger commercial reactors and fuel cycle facilities. Several areas of technology development are desired for worker productivity improvement, occupational exposure reduction, and waste volume reduction. In order to assess and plan for the decommissioning of large commercial nuclear facilities, projections have been made of the capacity of these facilities that may be decommissioned in the future and the radioactive waste that would be produced from the decommissioning of these facilities. These projections through the year 2025 are based on current data and the OECD reactor capacity forecast through the year 2000. A 25-year operating lifetime for electrical power generation was assumed. The possibilities of plant lifetime extension and the deferral of plant dismantlement make this projection very conservative

  16. Z Plant source aggregate area management study report

    International Nuclear Information System (INIS)

    1992-10-01

    The US Department of Energy (DOE) Hanford Site in Washington State is or into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989, included the 200 Areas of the Hanford Site on the National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980. Inclusion on the NPL initiates the Remedial Investigation (RI) and Feasibility Study (FS) process for characterizing the nature and extent of contamination, assessing risks to human health and the environment, and selection of remedial actions. This report presents the insults of an aggregate area management study (AAMS) for the Z Plant Aggregate Area located m the 200 Areas. The study provides the basis for initiating RIIFS under CERCLA or under the Resource Conservation and Recovery Act (RCRA) Facility Investigations (RFI) and Corrective Measures Studies (CMS). This report also integrates RCRA treatment, storage, or disposed (TSD) closure activities with CERCLA and RCRA past-practice investigations

  17. Front Range Forest Health Partnership Phase 1 feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Volkin, P

    1998-09-01

    The Front Range Forest Health Partnership is an alliance of individuals, citizen groups, federal, state, private, and nonprofit organizations that formed to promote forest health restoration and reduce fire risks on Colorado's Front Range. The partnership promotes selective thinning to restore forest health and supports economically feasible end uses for wood waste materials. The Phase I study was initiated to determine the environmental and economic feasibility of using wood wastes from forested and urban areas for the production of fuel-grade ethanol.

  18. Pre-feasibility study template for nZEB pilot projects development

    OpenAIRE

    Crespo Sánchez, Eva

    2015-01-01

    This document corresponds to Task 5.2 NZEB pilot projects development, Deliverable 5.2 Basic project conceptual design with feasibility analysis for eight pilot project of the SUSTAINCO project and should present a structure of pre-feasibility studies for eight NZEB projects implementation. It aims to give an overview of how SUSTAINCO project implementation is to be prepared and which technical and financial parameters to concern.

  19. Important considerations for feasibility studies in physical activity research involving persons with multiple sclerosis: a scoping systematic review and case study.

    Science.gov (United States)

    Learmonth, Yvonne C; Motl, Robert W

    2018-01-01

    Much research has been undertaken to establish the important benefits of physical activity in persons with multiple sclerosis (MS). There is disagreement regarding the strength of this research, perhaps because the majority of studies on physical activity and its benefits have not undergone initial and systematic feasibility testing. We aim to address the feasibility processes that have been examined within the context of physical activity interventions in MS. A systematic scoping review was conducted based on a literature search of five databases to identify feasibility processes described in preliminary studies of physical activity in MS. We read and extracted methodology from each study based on the following feasibility metrics: process (e.g. recruitment), resource (e.g. monetary costs), management (e.g. personnel time requirements) and scientific outcomes (e.g. clinical/participant reported outcome measures). We illustrate the use of the four feasibility metrics within a randomised controlled trial of a home-based exercise intervention in persons with MS. Twenty-five studies were identified. Resource feasibility (e.g. time and resources) and scientific outcomes feasibility (e.g. clinical outcomes) methodologies were applied and described in many studies; however, these metrics have not been systematically addressed. Metrics related to process feasibility (e.g. recruitment) and management feasibility (e.g. human and data management) are not well described within the literature. Our case study successfully enabled us to address the four feasibility metrics, and we provide new information on management feasibility (i.e. estimate data completeness and estimate data entry) and scientific outcomes feasibility (i.e. determining data collection materials appropriateness). Our review highlights the existing research and provides a case study which assesses important metrics of study feasibility. This review serves as a clarion call for feasibility trials that will

  20. The Feasibility of Noise Control in a Soft Drink Plant

    Directory of Open Access Journals (Sweden)

    Fouladi Dehaghi

    2016-03-01

    Full Text Available Background “Noise” can be defined as any unwanted sound. Soft drink plants, which produce the raw materials used in most carbonated beverage factories, are sources of noise. Objectives This study investigated the noise pollution present in a soft drink CO2 gas injection plant, in order to present noise control measures. Materials and Methods The instructions specified by the canadian center for occupational health and safety (CCOHS were followed during the noise study, and a sound level meter, CEL.450 calibrated with CEL-110.2 based on ISO-9612 methods, was used to record the sound pressure level (SPL at each grid point. SPL was determined in weighting scales A and C. and a noise survey map of equivalent SPLs was drawn for each part. Each part of the floor area of the soft drink factory where SPL exceeded 85 dBA was identified from the noise survey map to determine the causes of high levels of noise. In order to reduce noise level in each part, the absorption coefficient, transmission loss, and noise reduction rate were calculated in the proposed control area. Results According to the study results, noise levels in a CO2 plant’s house and control room ranged from 88 to 102 dB and 79 to 82 dB (A, respectively. In order to reduce the amount of emitted noise in the CO2 plant house and control room, a noise control plan was implemented in each part of the facility; it was met with effective results. Conclusions The findings of this investigation have clearly revealed that plant workers are at risk of developing noise-induced hearing loss. However, after the implementation of a noise control plan in each part of the facility, the noise dose received by workers has significantly decreased. The need to implement a noise conservation program was established.

  1. Feasibility and economic analysis of solid desiccant wheel used for dehumidification and preheating in blast furnace: A case study of steel plant, Nanjing, China

    International Nuclear Information System (INIS)

    Guan, Yipeng; Zhang, Yufeng; Sheng, Ying; Kong, Xiangrui; Du, Song

    2015-01-01

    To overcome the shortcomings of huge energy consumption from conventional dehumidification using lithium bromide adsorption refrigerating (LBARD) system, a novel desiccant wheel dehumidification and preheating (DWDP) system using two-stage desiccant wheel for blast furnace is brought forward. The DWDP system was designed for dehumidification and preheating in blast furnace of steel plant. It takes waste heat in the slag flushing water as desiccant regeneration and preheating energy. To validate the feasibility of the new DWDP system, experimental studies were conducted based on a steel plant in Nanjing, China. The experiment was designed to use DWDP system in humid outdoor climates e.g. summer seasons. The experimental results indicate that the moisture removal capacity of DWDP system can reach 8.7 g/kg which will lead to the improvement of steel production by 0.9% and the coal is saved of about 2100 tons per year. With the DWDP system, the energy consumed by cooling tower of slag flushing water can decrease 7.3%. All of these energy saved equates to 10.3 million CNY annually. A comparison of initial investment and operating cost between DWDP system and LBRAD system was then carried out. The results show that the initial investment and operating cost of DWDP system is 37% and 57% of present LBARD system, and the payback period is shortened 66%. - Highlights: • A novel two-stage desiccant wheel dehumidification system for blast furnace is proposed. • Average moisture removal of 8.7 g/kg is achieved and dehumidification efficiency is 47%. • Outlet humidity ratio is less than 10 g/kg that satisfies the requirement of blast air. • Waste heat in slag flushing water is utilized and 61.4 million kJ is saved annually. • The investment and operating cost is 37% and 57% of former dehumidification system

  2. Active Treatment for Idiopathic Adolescent Scoliosis (ACTIvATeS): a feasibility study.

    Science.gov (United States)

    Williams, Mark A; Heine, Peter J; Williamson, Esther M; Toye, Francine; Dritsaki, Melina; Petrou, Stavros; Crossman, Richard; Lall, Ranjit; Barker, Karen L; Fairbank, Jeremy; Harding, Ian; Gardner, Adrian; Slowther, Anne-Marie; Coulson, Neil; Lamb, Sarah E

    2015-07-01

    The feasibility of conducting a definitive randomised controlled trial (RCT) evaluating the clinical effectiveness and cost-effectiveness of scoliosis-specific exercises (SSEs) for adolescent idiopathic scoliosis (AIS) is uncertain. The aim of this study was to assess the feasibility of conducting a large, multicentre trial of SSE treatment for patients with AIS, in comparison with standard care, and to refine elements of the study design. The objectives were to (1) update a systematic review of controlled trials evaluating the efficacy of SSE in AIS; (2) survey UK orthopaedic surgeons and physiotherapists to determine current practice, patient populations and equipoise; (3) randomise 50 adolescents to a feasibility trial of either usual care or SSE interventions across a range of sites; (4) develop, document and assess acceptability and adherence of interventions; (5) assess and describe training requirements of physiotherapists; and (6) gain user input in all relevant stages of treatment and protocol design. Multicomponent feasibility study including UK clinician survey, systematic literature review and a randomised feasibility trial. The randomised feasibility study involved four secondary care NHS trusts providing specialist care for patients with AIS. The randomised feasibility study recruited people aged 10-16 years with mild AIS (Cobb angle of physiotherapy SSE programme supported by a home exercise plan. Our choice of intervention was informed by a systematic review of exercise interventions for AIS. The main outcome was feasibility of recruitment to the randomised study. Other elements were to inform choice of outcomes for a definitive trial and included curve severity, quality of life, requirement for surgery/brace, adverse events, psychological symptoms, costs and health utilities. A UK survey of orthopaedic consultants and physiotherapists indicated a wide variation in current provision of exercise therapy through physiotherapy services. It also found

  3. Feasibility study for remedial action at the chemical plant area of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1992-11-01

    The Weldon Spring site is radioactively and chemically contaminated at levels that exceed certain standards and guidelines for protecting human health and the environment. The ongoing site characterization and environmental monitoring programs provide information on the nature and extent of contamination, including information for off-site areas to which contaminants have migrated or could migrate in the future. Although humans and biota are not adversely impacted by site contaminants at this time, the purpose of DOE's remedial action program is to preclude the potential for such impacts in the future by implementing long-term environmental restoration and waste management decisions. The DOE is addressing long-term management of the Weldon Spring site through an integrated environmental decision-making process. Supporting information for the feasibility study is provided in Appendixes A through J. This information addresses scoping (Appendix A), engineering technologies (Appendix B), potential health and environmental impacts (Appendixes C, D, E, F, H and I), regulatory requirements (Appendix G), and letters of consultation received from the various agencies contacted (Appendix J). Additional engineering information is presented in supporting technical reports

  4. The Forest Energy Chain in Tuscany: Economic Feasibility and Environmental Effects of Two Types of Biomass District Heating Plant

    Directory of Open Access Journals (Sweden)

    Claudio Fagarazzi

    2014-09-01

    Full Text Available The purpose of this study was to examine two biomass district heating plants operating in Tuscany, with a specific focus on the ex-post evaluation of their economic and financial feasibility and of their environmental benefits. The former biomass district heating plant supplies only public users (Comunità Montana della Lunigiana, CML: administrative body that coordinates the municipalities located in mountain areas, the latter supplies both public and private users (Municipality of San Romano in Garfagnana. Ex-post investment analysis was performed to check both the consistency of results with the forecasts made in the stage of the project design and on the factors, which may have reduced or jeopardized the estimated economic performance of the investment (ex-ante assessment. The results of the study point out appreciable results only in the case of biomass district heating plants involving private users and fuelled by biomasses sourced from third parties. In this case, the factors that most influence ex-post results include the conditions of the woody biomass local market (market prices, the policies of energy selling prices to private users and the temporal dynamics of private users’ connection. To ensure the consistency of ex-post economic outcome with the expected results it is thus important to: (i have good knowledge of the woody local market; (ii define energy selling prices that should be cheap for private users but consistent with energy production costs and (iii constrain private users beforehand to prevent errors in the plant design and in the preliminary estimate of return on investment. Moreover, the results obtained during the monitoring activities could help in providing information on the effectiveness of the supporting measures adopted and also to orient future choices of policy makers and particularly designers, to identify the most efficient configuration of district heating organization for improving energy and

  5. Bond Feasibility Study. Project Identification Committee Report.

    Science.gov (United States)

    Wichita Public Schools, KS.

    A committee, appointed by the Board of Education, was requested to make a comprehensive study of the school building needs of Unified School District No. 259. In an attempt to determine the feasibility of a general bond election to upgrade the public schools, the specific charge to the committee was to evaluate the needs for physical plant…

  6. Ear-EEG from generic earpieces: A feasibility study

    DEFF Research Database (Denmark)

    Kidmose, Preben; Looney, D; Jochumsen, Lars

    2013-01-01

    key patient needs (discreet, unobstrusive, user-friendly, robust) and that is low-cost and suitable for off-the-shelf use; thus promising great advantages for healthcare applications. Its feasibility is validated in a comprehensive comparative study with our established prototype, based...

  7. Bromination vis-a-vis chlorination as a biocide feasibility study

    International Nuclear Information System (INIS)

    Upadhyay, S.K.; Nagaigh, N.; Mittal, S.

    2000-01-01

    friendly. This paper highlights the brief details on the feasibility studies carried out on bromination. (author)

  8. Fast-mixed spectrum reactor interim report initial feasibility study

    International Nuclear Information System (INIS)

    Fischer, G.J.; Cerbone, R.J.

    1979-01-01

    The report summarizes the results of an initial four-month feasibility study of the Fast-Mixed Spectrum Reactor (FMSR). Reactor physics, fuel cycle, and thermal-hydraulic analyses were performed on a reference design. These results when coupled to a fuel and materials evaluation performed in cooperation with the Argonne National Laboratory indicate that the FMSR is feasible provided the fuels, cladding, and subassembly ducts can survive a peak fuel burnup of 15 to 20 atom percent heavy metal and peak fluences of 8 x 10 23 (nvt > 0.1 MeV). The results of this short study have also provided a basis for exploring alternative designs requiring significantly lower peak burnup and fluences for their operation

  9. Longitudinal study of the feasibility of using ecological momentary assessment to study teacher stress: Objective and self-reported measures.

    Science.gov (United States)

    McIntyre, Teresa M; McIntyre, Scott E; Barr, Christopher D; Woodward, Phillip S; Francis, David J; Durand, Angelia C; Mehta, Paras; Kamarck, Thomas W

    2016-10-01

    There is a lack of comprehensive research on Ecological Momentary Assessment (EMA) feasibility to study occupational stress, especially its long-term sustainability. EMA application in education contexts has also been sparse. This study investigated the feasibility of using EMA to study teacher stress over 2 years using both objective compliance data and a self-reported feasibility survey. It also examined the influence of individual and school factors on EMA feasibility. Participants were 202 sixth through eighth grade teachers from 22 urban middle schools in the southern United States. EMA was implemented via an iPod-based Teacher Stress Diary (TSD). Teachers recorded demands, stress responses, and resources during 12 days (6 waves) over 2 years. Feasibility was assessed via compliance data generated by the TSD (e.g., entry completion) and an EMA Feasibility Survey of self-reported user-friendliness and EMA interference. The results showed high compliance regarding entry and item completion, and completion time, which was sustained over time. User-friendliness was appraised as very high and EMA interference as low. Initial difficulties regarding timing and length of assessments were addressed via EMA method refinement, resulting in improved feasibility. Teachers' ethnicity, age, marital status, grade/course taught, class size, class load, and daily workload impacted feasibility. The results supported the feasibility of using EMA to study work stress longitudinally and the value of continued feasibility monitoring. They also support EMA use to study teacher stress and inform EMA implementation in schools. Some teacher and school factors need to be taken into consideration when deciding on EMA implementation in education contexts. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  10. Feasibility study on intersection in North Sumatera

    Science.gov (United States)

    Hastuty, I. P.; Sembiring, I. S.; Anas, R.; Lubis, A. S.

    2018-02-01

    Traffic congestion is one of the problems faced by big cities, One of them is Binjai city and Medan city in North Sumatera. One of the causes of congestion is intersection of roads with highway and roads with railroads. To ensure the smooth movement of vehicles, technical handling at the intersection is needed. Therefore, it is necessary to pre-study the feasibility of level crossing in Binjai and Medan to be able to assess the investment needs and the level of importance of road development in the region. The development of transportation infrastructure and facilities is based on the thought of improving the transportation network system. The necessity of systemical integrated transportation system handling is needed in creating a transportation efficiency. The purpose of this study is to identify and prioritize the needs of the railway crossings. The objective which we want to be achieved is to obtain a document that contains technical, economic and environmental ability indicators as a reference in the feasibility and planning studies. The methodology used is collecting the primary data, secondary data, introduction of study area as the initial analysis of the problem. From the study it can be concluded that the existence of railway interchange will move the movement through traffic so it will not interfere the movement of traffic within urban areas and it keeps the national road network performance is still good.

  11. International Case-Control Study of Adult Brain, Head and Neck Tumours: Results of the Feasibility Study (invited paper)

    International Nuclear Information System (INIS)

    Cardis, E.; Kilkenny, M.

    1999-01-01

    The objectives of the feasibility study were to collect and analyse the information necessary to assess the feasibility of a multi-centric study of adult head and neck tumours (including brain tumours) and mobile telephones. Information was obtained on the availability and accessibility of records from companies, the prevalence of mobile telephone use over time and the expected number of tumour cases in the proposed study regions. The conclusion is that it is feasible to develop a study of the relation between mobile telephone use and brain cancer risk. The feasibility of a study of the relation between radiofrequency exposure and cancer risk is, however, unclear at present. It is unknown whether a sufficiently accurate and precise RF exposure gradient can be derived to classify adequately each subject in the proposed study. A study of the relation between mobile telephone use and risk of salivary gland tumours and acoustic neurinomas is probably feasible, but more information is required about the logistic difficulties of ascertaining these cases in the study regions. Two subcommittees have been formed to develop the exposure measurement and epidemiological aspect of the study. (author)

  12. Training Endogenous Task Shifting Using Music Therapy: A Feasibility Study.

    Science.gov (United States)

    Lynch, Colleen; LaGasse, A Blythe

    2016-01-01

    People with acquired brain injury (ABI) are highly susceptible to disturbances in executive functioning (EF), and these effects are pervasive. Research studies using music therapy for cognitive improvement in this population are limited. The purpose of this study was to determine the feasibility of a Musical Executive Function Training (MEFT) intervention to address task-shifting skills in adults with ABI and to obtain preliminary evidence of intervention effect on task shifting. Fourteen participants were randomly assigned to one of three groups: a music therapy intervention group (MTG), a singing group (SG), or the no-intervention control group (CG). The SG and MTG met for one hour a day for five days. Feasibility measures included participant completion rates and intervention fidelity. Potential benefits were measured using the Trail Making Test and the Paced Auditory Serial Addition Task as a pre- and posttest measure. Participant completion rates and interventionist fidelity to the protocol supported feasibility. One-way ANOVA of the pre- and posttest group differences revealed a trend toward improvement in the MTG over the SG. Feasibility and effect size data support a larger trial of the MEFT protocol. © the American Music Therapy Association 2016. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  13. FY 2000 report on the basic survey to promote the joint implementation. Feasibility study for new installation of the Ashuganj NGL rectification plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku ni okeru Ashuganj NGL seiryu plant shinsetsu no tame no FS chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of effectively using natural gas and controlling the decrease in forests having ability to absorb/store greenhouse effect gas, a project was worked out for construction of the NGL rectification plant to produce LPG, MS and HSD at Ashuganj in Bangladesh, and the feasibility study was conducted. A total of 467t/d of NGL as raw material is transported from the Sylhet section to the plant site by pipeline with 175km distance and 6 inch diameter. In this project, this NGL is rectified to produce LPG of 123t/d, MS of 262t/d and HSD of 82t/d. As a result of the study, the substitution energy effect in this project is approximately 45,000 toe/y. The greenhouse effect gas emission is reduced by 861,000 t-CO2/y by converting the residential/commercial use fuel from firewood as biomass fuel to LPG. The ROI before tax is 19.24% in 20 years, which predicts a high earning rate. (NEDO)

  14. A study on the feasibility of environmental impacts assessment for Wolsung nuclear 3 and 4 - Ecology, population and socio-economic environment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Ho; Lee, Jin Hong; Hong, Seong Soo [Chungnam National Univ., Taejon (Korea, Republic of)] (and others)

    1993-09-15

    It is necessary to study persistently methodology and all relevant information for environmental impacts assessment, which will make the assessment be more effective. The contents and scope of this project are summarized as follows : review on the feasibility of the overall environmental status surveyed at the vicinity of the proposed nuclear power plants, review on the assessment of the probable impacts, review on the potential of alternatives to minimize the adverse impacts on the surrounding environments.

  15. The feasibility study on commercialized fast reactor cycle system

    International Nuclear Information System (INIS)

    Noda, Hiroshi

    2002-01-01

    The feasibility study on commercialized Fast Reactor cycle system (FS) has been carried out by a joint team with the participation of all parties concerned in Japan since July, 1999. It aims to clarify various perspectives for commercialized fast reactor cycle system and also suggest development strategies to diverse social needs in the 21 st century. The FS consists of several phases. The phase 1 has progressed as planned and the highly feasible candidate concepts with innovative technologies have been screened out among a wide variety of concepts. During the phase 2, approximately five years after the phase 1, the in-depth design studies and engineering scale tests of key technologies are being conducted to verify and validate the feasibility of screened candidate concepts. At the end of the phase 2, a few promising concepts will be selected with their R and D tasks. The paper describes the results of the phase 1, the activities of the phase 2 and the new concept related to the fast reactor fuel cycle focusing on the reduction in environmental burden, which is one of key factors to sustain the nuclear power generation in the 21 st century

  16. A feasibility study of thyroid cancer among patients treated with I-131

    International Nuclear Information System (INIS)

    Anderson, T.W.

    1984-04-01

    This study examined the feasibility of conducting a Canada-wide follow-up study of persons receiving I-131 before 1970, to see if current estimates of induction of thyroid cancer are well founded. It is concluded that such a study is not feasible due to the widespread destruction of old records, and the limited quantity of personal identifying information on those records that do still exist

  17. Feasibility study for private-sector treatment services for alpha-contaminated low-level mixed wastes

    International Nuclear Information System (INIS)

    Bloom, R.R.; Rodriguez, R.R.

    1995-01-01

    Rust Federal Services, under contract to the United States Department of Energy (DOE), Idaho Operations Office, performed a study to develop and evaluate the feasibility of a suggested private sector solution for the treatment of alpha-contaminated low-level mixed waste (ALLMW) stored or produced at the Idaho National Engineering Laboratory (INEL). The feasibility study is an initial step in the potential procurement of privatized treatment services for these wastes. Rust's derived objective of the feasibility study was to define an optimal treatment system and analyze the feasibility of that system for accomplishing the processing objectives specified by DOE. All aspects of the selected treatment system were addressed in the feasibility study, including technical, regulatory, public involvement, and financial considerations. Two central elements of the study were a technology screening task to select the optimal treatment system and an analysis of the institutional, business, financial, and contractual issues that are likely to accompany the privatization of treatment services for DOE

  18. Feasible reactor power cutback logic development for an integral reactor

    International Nuclear Information System (INIS)

    Han, Soon-Kyoo; Lee, Chung-Chan; Choi, Suhn; Kang, Han-Ok

    2013-01-01

    Major features of integral reactors that have been developed around the world recently are simplified operating systems and passive safety systems. Even though highly simplified control system and very reliable components are utilized in the integral reactor, the possibility of major component malfunction cannot be ruled out. So, feasible reactor power cutback logic is required to cope with the malfunction of components without inducing reactor trip. Simplified reactor power cutback logic has been developed on the basis of the real component data and operational parameters of plant in this study. Due to the relatively high rod worth of the integral reactor the control rod assembly drop method which had been adapted for large nuclear power plants was not desirable for reactor power cutback of the integral reactor. Instead another method, the control rod assembly control logic of reactor regulating system controls the control rod assembly movements, was chosen as an alternative. Sensitivity analyses and feasibility evaluations were performed for the selected method by varying the control rod assembly driving speed. In the results, sensitivity study showed that the performance goal of reactor power cutback system could be achieved with the limited range of control rod assembly driving speed. (orig.)

  19. Deschutes estuary feasibility study: hydrodynamics and sediment transport modeling

    Science.gov (United States)

    George, Douglas A.; Gelfenbaum, Guy; Lesser, Giles; Stevens, Andrew W.

    2006-01-01

    Continual sediment accumulation in Capitol Lake since the damming of the Deschutes River in 1951 has altered the initial morphology of the basin. As part of the Deschutes River Estuary Feasibility Study (DEFS), the United States Geological Survey (USGS) was tasked to model how tidal and storm processes will influence the river, lake and lower Budd Inlet should estuary restoration occur. Understanding these mechanisms will assist in developing a scientifically sound assessment on the feasibility of restoring the estuary. The goals of the DEFS are as follows. - Increase understanding of the estuary alternative to the same level as managing the lake environment.

  20. The Feasibility study of laser peening effects on the Nuclear power plants Using Shot peening treatment with operating temperature

    International Nuclear Information System (INIS)

    Kim, Jong Cheon; Kim, Tae Hyung; Cheong, S. K.; Cho, Hong Seok

    2010-01-01

    Recently, the nuclear power plants industry was faced with material aging problems. One of them is Primary water stress corrosion cracking (PWSCC). Even if Alloy 600, which is a nickel based superalloy, has been used in some parts of nuclear power plants, it is widely used in the manufacturing of commercial and military components. The Alloy 600 is a standard structural engineering material which requires the resistance to corrosion and thermal effects. However, some parts of BMI nozzle have PWSCC problem. Several methods have been used to prevent PWSSC. Typically, peening process is used extensively in the industry to improve life time and to mitigate stress corrosion cracking (SCC). Laser peening (LP) is one of the best ways to achieve the above reasons. This technology was already applied to nuclear power plants by developed countries. Nowadays Korea nuclear power plants industry is highly ranked in the world market. Thus, the demands of laser peening technology will increase. However, it is very difficult to characterize the material properties after peening treatment on the parts of nuclear power plants. Therefore, we accomplished a precedent study of experiments to investigate the effects of peening process on the Alloy 600, and the threshold temperature for stress relief and the effect of LP through the Shop peening(SP). LP and SP process have equal mechanism but just different peening media. In this paper, to determine the effects of laser peening process on the nuclear power plants manufacture Alloy 600 using the shot peening treatment with operating temperatures

  1. Fiscal 1996 survey report on the environmentally friendly type coal utilization system feasibility study. Feasibility study of the environmentally friendly type coal utilization system in the Philippines; Kankyo chowagata sekitan riyo system kanosei chosa. Philippines ni okeru kankyo chowagata sekitan riyo system kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Grasping the present situation of coal utilization technology in the Philippines, the paper proposed a feasibility study of introduction of the environmentally friendly type coal utilization system which seems to be needed in the future. (1) Introduction of the environmentally friendly type coal utilization system in the electric power generation sector: there are only four full-scale running coal thermal power plants in the Philippines. In the future, several coal thermal plants are planned to be constructed by 2005, but for the new installation, it is desirable to adopt fluidized bed boilers with wide application to coal kinds. In case of 0.3-1.0 million MW class plants, it is planned to adopt high grade import coals, and it will be natural to fire pulverized coal. For the processing of flue gas, it is a must to install desulfurization facilities and smoke/soot removal devices. (2) Utilization/development of domestic low grade coals: at the mine-mouth generating plant, it is necessary to investigate the economically minable amount of coal, confirm productivity, survey coal quality, etc., and select boiler. As to coal briquetting technology, it is necessary to examine coal quality for tests and make a thorough study of what technology is most suitable. 50 figs., 78 tabs.

  2. A Feasibility Study of Youth Apprenticeship in Arkansas.

    Science.gov (United States)

    Jobs for the Future, Inc., West Somerville, MA.

    A study assessed the feasibility and attractiveness of youth apprenticeship in Arkansas in over 80 interviews with employers in 5 key Arkansas industries and occupations. They were allied health, food processing (equipment repair and maintenance and lab technician/quality control), information services, metalworking, and self-employment and…

  3. Mindfulness and Climate Change Action: A Feasibility Study

    Directory of Open Access Journals (Sweden)

    Maggie Grabow

    2018-05-01

    Full Text Available Pro-environmental behaviors and the cultural shifts that can accompany these may offer solutions to the consequences of a changing climate. Mindfulness has been proposed as a strategy to initiate these types of behaviors. In 2017, we pilot-tested Mindful Climate Action (MCA, an eight-week adult education program that delivers energy use, climate change, and sustainability content in combination with training in mindfulness meditation, among 16 individuals living in Madison, WI. We collected participant data at baseline and at different times across the study period regarding household energy use, transportation, diet, and health and happiness. This pilot study aimed to evaluate the feasibility of the various MCA study practices including measurement tools, outcome assessment, curriculum and related educational materials, and especially the mindfulness-based climate action trainings. MCA was well-received by participants as evidenced by high adherence rate, high measures of participant satisfaction, and high participant response rate for surveys. In addition, we successfully demonstrated feasibility of the MCA program, and have estimated participant’s individual carbon footprints related to diet, transportation, and household energy.

  4. Defining Feasibility and Pilot Studies in Preparation for Randomised Controlled Trials: Development of a Conceptual Framework.

    Directory of Open Access Journals (Sweden)

    Sandra M Eldridge

    Full Text Available We describe a framework for defining pilot and feasibility studies focusing on studies conducted in preparation for a randomised controlled trial. To develop the framework, we undertook a Delphi survey; ran an open meeting at a trial methodology conference; conducted a review of definitions outside the health research context; consulted experts at an international consensus meeting; and reviewed 27 empirical pilot or feasibility studies. We initially adopted mutually exclusive definitions of pilot and feasibility studies. However, some Delphi survey respondents and the majority of open meeting attendees disagreed with the idea of mutually exclusive definitions. Their viewpoint was supported by definitions outside the health research context, the use of the terms 'pilot' and 'feasibility' in the literature, and participants at the international consensus meeting. In our framework, pilot studies are a subset of feasibility studies, rather than the two being mutually exclusive. A feasibility study asks whether something can be done, should we proceed with it, and if so, how. A pilot study asks the same questions but also has a specific design feature: in a pilot study a future study, or part of a future study, is conducted on a smaller scale. We suggest that to facilitate their identification, these studies should be clearly identified using the terms 'feasibility' or 'pilot' as appropriate. This should include feasibility studies that are largely qualitative; we found these difficult to identify in electronic searches because researchers rarely used the term 'feasibility' in the title or abstract of such studies. Investigators should also report appropriate objectives and methods related to feasibility; and give clear confirmation that their study is in preparation for a future randomised controlled trial designed to assess the effect of an intervention.

  5. Defining Feasibility and Pilot Studies in Preparation for Randomised Controlled Trials: Development of a Conceptual Framework.

    Science.gov (United States)

    Eldridge, Sandra M; Lancaster, Gillian A; Campbell, Michael J; Thabane, Lehana; Hopewell, Sally; Coleman, Claire L; Bond, Christine M

    2016-01-01

    We describe a framework for defining pilot and feasibility studies focusing on studies conducted in preparation for a randomised controlled trial. To develop the framework, we undertook a Delphi survey; ran an open meeting at a trial methodology conference; conducted a review of definitions outside the health research context; consulted experts at an international consensus meeting; and reviewed 27 empirical pilot or feasibility studies. We initially adopted mutually exclusive definitions of pilot and feasibility studies. However, some Delphi survey respondents and the majority of open meeting attendees disagreed with the idea of mutually exclusive definitions. Their viewpoint was supported by definitions outside the health research context, the use of the terms 'pilot' and 'feasibility' in the literature, and participants at the international consensus meeting. In our framework, pilot studies are a subset of feasibility studies, rather than the two being mutually exclusive. A feasibility study asks whether something can be done, should we proceed with it, and if so, how. A pilot study asks the same questions but also has a specific design feature: in a pilot study a future study, or part of a future study, is conducted on a smaller scale. We suggest that to facilitate their identification, these studies should be clearly identified using the terms 'feasibility' or 'pilot' as appropriate. This should include feasibility studies that are largely qualitative; we found these difficult to identify in electronic searches because researchers rarely used the term 'feasibility' in the title or abstract of such studies. Investigators should also report appropriate objectives and methods related to feasibility; and give clear confirmation that their study is in preparation for a future randomised controlled trial designed to assess the effect of an intervention.

  6. Feasibility studies - Oesthammar, Nykoeping, Oskarshamn, Tierp, Hultsfred and Aelvkarleby. Summary report

    International Nuclear Information System (INIS)

    2001-06-01

    Swedish Nuclear Fuel and Waste Management Company, SKB, has carried out feasibility studies on a municipal scale as a part of the siting programme for the deep repository for spent nuclear fuel. Final reports describing the results of the six feasibility studies in Oesthammar, Nykoeping, Oskarshamn, Tierp, Aelvkarleby and Hultsfred were submitted during the autumn and winter of 2000/2001. With this as a basis, the siting work can now proceed to the next phase - site investigations. In this stage, investigations that include test drilling will be conducted on at least two sites. In December 2000, SKB published the report 'Integrated account of method, site selection and programme prior to the site investigation phase', in which SKB stipulates where they want to conduct site investigations and how they will be carried out. The report is being reviewed by the Swedish Nuclear Power Inspectorate during the first half of 2001. Before the site investigations can be initiated,the go-ahead is required from the national safety authorities, the Government, and concerned municipalities and landowners. SKB projects that the it will be possible to commence the site investigations in 2002. This report comprises an English summary of the final reports from the six feasibility studies. The report summarizes the most important results and conclusions from the different feasibility studies. All six final reports are available in their entirety in Swedish

  7. Feasibility studies - Oesthammar, Nykoeping, Oskarshamn, Tierp, Hultsfred and Aelvkarleby. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    Swedish Nuclear Fuel and Waste Management Company, SKB, has carried out feasibility studies on a municipal scale as a part of the siting programme for the deep repository for spent nuclear fuel. Final reports describing the results of the six feasibility studies in Oesthammar, Nykoeping, Oskarshamn, Tierp, Aelvkarleby and Hultsfred were submitted during the autumn and winter of 2000/2001. With this as a basis, the siting work can now proceed to the next phase - site investigations. In this stage, investigations that include test drilling will be conducted on at least two sites. In December 2000, SKB published the report 'Integrated account of method, site selection and programme prior to the site investigation phase', in which SKB stipulates where they want to conduct site investigations and how they will be carried out. The report is being reviewed by the Swedish Nuclear Power Inspectorate during the first half of 2001. Before the site investigations can be initiated,the go-ahead is required from the national safety authorities, the Government, and concerned municipalities and landowners. SKB projects that the it will be possible to commence the site investigations in 2002. This report comprises an English summary of the final reports from the six feasibility studies. The report summarizes the most important results and conclusions from the different feasibility studies. All six final reports are available in their entirety in Swedish.

  8. Feasibility study for biomass power plants in Thailand. Volume 2. appendix: Detailed financial analysis results. Export trade information

    International Nuclear Information System (INIS)

    1997-01-01

    This study, conducted by Black and Veatch, was funded by the U.S. Trade and Development Agency. The report presents a technical and commercial analysis for the development of three nearly identical electricity generating facilities (biomass steam power plants) in the towns of Chachgoengsao, Suphan Buri, and Pichit in Thailand. Volume 2 of the study contains the following appendix: Detailed Financial Analysis Results

  9. Potential of organic Rankine cycle technology in India: Working fluid selection and feasibility study

    International Nuclear Information System (INIS)

    Sarkar, Jahar; Bhattacharyya, Souvik

    2015-01-01

    India has great potential to employ the ORC (organic Rankine cycle) technology for conversion of low temperature waste heat and renewable energy. In this study, available waste heat and relevant renewable heat sources in India are reviewed and suitable working fluids for ORC have been selected based on operational, environmental and safety criteria. A feasibility study and comparison of selected fluids for ORC is also presented for Indian climates along with discussions on component, operation and cost related aspects. A comprehensive review on available heat sources and sinks shows that India has plenty of waste heat and renewable energy sources for electricity generation by means of ORC; however, condenser operation may be challenging due to wide ambient temperature variation. Appropriate performance comparison among selected working fluids shows that ammonia is the best fluid in terms of net power generation and compactness of turbo-machineries, whereas n-Pentane is the best fluid in terms of thermal efficiency and heat exchanger compactness. Both are recommended as working fluids for ORC installations in India. The study reveals that there is a great opportunity to employ this technology in India provided we have to overcome some challenges related to component selection, finance and maintenance. - Highlights: • Available waste heat and renewable heat energies, and sinks in India are reviewed. • Suitable working fluids are selected by operational, environmental and safety criteria. • A feasibility study and comparison of selected fluids are presented for Indian climates. • Ammonia and n-Pentane are recommended for ORC installation in India. • Challenges related to plant component, operation and cost are discussed.

  10. Investigation of the feasibility of underground coal gasification in North Dakota, United States

    International Nuclear Information System (INIS)

    Pei, Peng; Nasah, Junior; Solc, Jaroslav; Korom, Scott F.; Laudal, Daniel; Barse, Kirtipal

    2016-01-01

    Highlights: • A four-year feasibility study of underground coal gasification is presented. • A test site was selected for feasibility investigation. • Gasification test, a hydrogeological study and geomechanical study were performed. • Results suggest favorable conditions for UCG development at the selected site. - Abstract: Underground coal gasification (UCG) is a promising technology that has the potential to recover currently-unmineable coal resources. The technical feasibility and economic success of a UCG project is highly site specific. Any risks associated with UCG, such as subsidence, groundwater contamination, and syngas quality, should be sufficiently evaluated through a feasibility study. This paper presents a four-year UCG feasibility study utilizing lignite seams in North Dakota, United States. Four wells were drilled through the lignite seams at a selected site, and lignite and strata cores were recovered. A geological model of the formation was built, coal and rock properties were analyzed, and field hydrogeological tests and laboratory gasification tests were performed. This work provided valuable insights in rock mechanics, hydrogeology, and coal properties. The study results show that the selected site is suitable for development of a UCG plant because there are minimal induced subsidence risks, there is hydrological isolation from major aquifers and the coal produces desirable syngas quality for liquid fuel production. Methodologies developed in this study will benefit the design, optimization and management of the UCG process.

  11. A feasibility study on feed and bleed for pressurized water reactors

    International Nuclear Information System (INIS)

    Yi-Shung Chen; Shimeck, D.J.; Sullivan, L.H.

    1983-01-01

    By injecting coolant with a high pressure emergency core cooling system, and removing the heated/ vaporized fluid by way of the pressurizer power operated relief valve, primary feed and bleed cooling denotes an operation whereby reactor core cooling is maintained. This paper presents the results from an experimental and analytical study that includes a simplified analysis of mass and energy balances associated with the feed and bleed, examination of test data from the Semiscale system, RELAP5 code analyses of both Semiscale and a four-loop Westinghouse plant, and the primary coolant system behavior for a transient that leads to the need for feed and bleed. Examination of the parameters that govern a stable feed and bleed operation identifies four key parameters such as: core decay heat, cooling water injection capacity, power operated relief valve (PORV) energy removal rate, and PORV mass removal rate. A simplified analytical approach to determining if stable feed and bleed is feasible, has been developed and corroborated by experimental data and computer code calculations. The Semiscale tests have not only provided test data for code assessment, but also have identified the factors influencing the PORV discharge, which is the most variable of the boundary conditions influencing feed and bleed. The RELAP5 computer code has demonstrated the capability of predicting the Semiscale experiments, and when applied to a four-loop Westinghouse plant has indicated that primary feed and bleed is a viable cooling mechanism. This has also been shown by using the simplified analytical method

  12. Staging and storage facility feasibility study. Final report

    International Nuclear Information System (INIS)

    Swenson, C.E.

    1995-02-01

    This study was performed to investigate the feasibility of adapting the design of the HWVP Canister Storage Building (CSB) to meet the needs of the WHC Spent Nuclear Fuel Project for Staging and Storage Facility (SSF), and to develop Rough Order of Magnitude (ROM) cost and schedule estimates

  13. Lifetime management research trend of Kori-1 nuclear power plant

    International Nuclear Information System (INIS)

    Kim, J. S.; Jeong, I. S.; Hong, S. Y.

    1998-01-01

    KEPRI launched the Nuclear Power Plant Lifetime Management Study(II) for the management of the latter half life of Kori-1. Main goal of LCM-IV study is the detail evaluation of main equipment life and establishment of aging management based on LCM-IV result. The result of LCM-IV on the kori-1 confirmed the technical and economical feasibility of life extension beyond the design life. Owing to absence of The regulatory policy for the life extension in korea, LCM-IV will focus on the minimum study which is essential for the actual lifetime management for the old nuclear power plant. License renewal study is expected after the establishment of Regulatory policy about the life extension of nuclear power plant. LCM trend in korea and abroad, result of technical and economical feasibility study and summary of LCM-IV is described on this paper

  14. Gas turbines for the rubber industry: Retrofit feasibility

    International Nuclear Information System (INIS)

    Demaria, F.; Pautasso, F.

    1992-01-01

    Cogeneration is becoming industry's choice to satisfy process requirements characterized by high energy demand and fairly steady thermal and electrical loads. This paper illustrated the suitability of cogeneration for the production of rubber and PVC floor tiles. The example studied here consists of a gas fuelled turboalternator set capable of producing 1,050 kW of electric power. The energy plant is equipped with a heat recovery system and a post-combustor for the production of a diathermic fluid used by the process equipment. The paper points out how engineers overcame the installation problems due to the presence of existing process equipment and the necessity for continuous plant operation during retrofitting. Attention is given to the energy and cost feasibility aspects of this intervention

  15. WERF MACT Feasibility Study Report

    Energy Technology Data Exchange (ETDEWEB)

    B. Bonnema; D. Moser; J. Riedesel; K. Kooda; K. Liekhus; K. Rebish; S. Poling

    1998-11-01

    This study was undertaken to determine the technical feasibility of upgrading the Waste Experimental Reduction Facility (WERF) at the Idaho National Engineering and Environmental Laboratory to meet the offgas emission limits proposed in the Maximum Achievable Control Technologies (MACT)rule. Four practicable offgas treatment processes were identified, which, if installed, would enable the WERF to meet the anticipated MACT emission limits for dioxins and furans (D/F), hydrochloric acid (HCI), and mercury (Hg). Due to the three-year time restraint for MACT compliance, any technology chosen for the upgrade must be performed within the general plant project funding limit of $5 M. The option selected consists of a partial-quench evaporative cooler with dry sorbent injection for HCI removal followed by a sulfur-impregnated activated carbon bed for Hg control. The planning cost estimate for implementing the option is $4.17 M (with 24% contingency). The total estimated cost includes capital costs, design and construction costs, and project management costs. Capital costs include the purchase of a new offgas evaporative cooler, a dry sorbent injection system with reagent storage, a new fabric filter baghouse, a fixed carbon bed absorber, and two offgas induced draft exhaust fans. It is estimated that 21 months will be required to complete the recommended modification to the WERF. The partial-quench cooler is designed to rapidly cool the offgas exiting the secondary combustion chamber to minimize D/F formation. Dry sorbent injection of an alkali reagent into the offgas is recommended. The alkali reacts with the HCI to form a salt, which is captured with the fly ash in the baghouse. A design HCI removal efficiency of 97.2% allows for the feeding 20 lbs/hr of chlorine to the WERF incinerator. The sorbent feed rate can be adjusted to achieve the desired HCI removal efficiency. A fixed bed of sulfur-impregnated carbon was conservatively sized for a total Hg removal capacity when

  16. Engineering study radioactive liquid waste treatment plant refurbishment

    International Nuclear Information System (INIS)

    Suazo, I.L.

    1994-01-01

    This feasibility study will investigate the opportunities, restrictions and cost impact to refurbish the existing Radioactive Liquid Waste Treatment Plant (RLWTP) while utilizing the same basic criteria that was used in the development of the new Radioactive Liquid Waste Treatment Facility (RLWTF). The objective of this study is to perform a more in-depth analysis of refurbishing the existing than has been done in the past so as to provide a basis for comparison between refurbishing the existing or constructing a new. The existing plant is located at Technical Area 50 (TA-50) within the Los Alamos National Laboratory (LANL). The initial structure was built in 1963. Over the ensuing years, the building has been modified and several additions have been constructed. In 1966, laboratories, ion exchange and pretreatment functions were added. The decontamination and decommissioning activities and ventilation equipment were added in 1984. The following assumptions are the basic parameters considered in the development of a design concept to refurbish the RLWTP: (1) Allow continued operation of the during retrofit construction. (2) Design the necessary expansion within the site constraints. (3) Satisfy National Pollutant Discharge Elimination System (NPDES) and National Emission Standards for Hazardous Air Pollutants (NESHAPS) permit conditions and other environmental regulations. (4) Comply with present DOE Orders and building code requirements. The refurbishment concept is a phased demolition and construction process

  17. Feasibility study on utilization of associated gas as CNG

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The Back Ho oilfield is the largest oilfield in Vietnam and at the same time is producing the largest amount of natural gas (associated gas) in Vietnam. Although the majority of the associated gas has been used in the power generation plant, a large amount of surplus gas is not effectively used because of shortage of fund and technologies. Accordingly, a feasibility study has been executed for a project to compress 20% of the associated gas into CNG, and use it effectively as automobile and factory fuel. As a result of the site survey, it was found that, although Vietnam consumes less amount of energy and emits less amount of CO2, the nation has a strong interest and a large amount of knowledge about global warming and CDM because the country is subjected to large effect of warming. Furthermore, it has been reconfirmed that introducing CNG into this territory is highly effective. Discussions have been made on places of installing the facilities, effective surplus gas utilization systems, facility specifications, utilities, and number of workers. Calculations were made on approximate cost of the facilities and the running cost. As a result of the surveys and discussions, it was determined that technological support from Japan and the Yen loan for environment with low interest rate are necessary. (NEDO)

  18. Feasibility study: Assess the feasibility of siting a monitored retrievable storage facility. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    King, J.W.

    1993-08-01

    The purpose of phase one of this study are: To understand the waste management system and a monitored retrievable storage facility; and to determine whether the applicant has real interest in pursuing the feasibility assessment process. Contents of this report are: Generating electric power; facts about exposure to radiation; handling storage, and transportation techniques; description of a proposed monitored retrievable storage facility; and benefits to be received by host jurisdiction.

  19. Feasibility study of full-reactor gas core demonstration test

    Science.gov (United States)

    Kunze, J. F.; Lofthouse, J. H.; Shaffer, C. J.; Macbeth, P. J.

    1973-01-01

    Separate studies of nuclear criticality, flow patterns, and thermodynamics for the gas core reactor concept have all given positive indications of its feasibility. However, before serious design for a full scale gas core application can be made, feasibility must be shown for operation with full interaction of the nuclear, thermal, and hydraulic effects. A minimum sized, and hence minimum expense, test arrangement is considered for a full gas core configuration. It is shown that the hydrogen coolant scattering effects dominate the nuclear considerations at elevated temperatures. A cavity diameter of somewhat larger than 4 ft (122 cm) will be needed if temperatures high enough to vaporize uranium are to be achieved.

  20. U Plant source aggregate area management study report

    International Nuclear Information System (INIS)

    1992-09-01

    The US Department of Energy (DOE) Hanford Site in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989, included the 200 Areas of the Hanford Site on the National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980. Inclusion on the NPL initiates the Remedial Investigation (RI) and Feasibility Study (FS) process for characterizing the nature and extent of contamination, assessing risks to human health and the environment, and selection of remedial actions. This report presents the results of an aggregate area management study (AAMS) for the U Plant Aggregate Area located in the 200 Areas. The study provides the basis for initiating RI/FS under CERCLA or under the Resource Conservation and Recovery Act (RCRA) Facility Investigations (RFI) and Corrective Measures Studies (CMS). This report also integrates RCRA treatment, storage, or disposal (TSD) closure activities with CERCLA and RCRA past-practice investigations

  1. T Plant source aggregate area management study report

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) Hanford Site in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989, included the 200 Areas of the Hanford Site on the National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980. Inclusion on the NPL initiates the Remedial Investigation (RI) and Feasibility Study (FS) process for characterizing the nature and extent of contamination, assessing risks to human health and the environment, and selection of remedial actions. This report presents the results of an aggregate area management study (AAMS) for the T Plant Aggregate Area located in the 200 Areas. The study provides the basis for initiating RI/FS under CERCLA or under the Resource Conservation and Recovery Act (RCRA) Facility Investigations (RFI) and Corrective Measures Studies (CMS). This report also integrates RCRA treatment, storage, or disposal (TSD) closure activities with CERCLA and RCRA past-practice investigations

  2. B Plant source aggregate area management study report

    International Nuclear Information System (INIS)

    1993-03-01

    The US Department of Energy (DOE) Hanford Site in Washington state is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 100 Areas (Figure 1--1). The US Environmental Protection Agency (EPA), in November 1989, included the 200 Areas of the Hanford KLSite on the National Priorities List (NPL), included the 200 Areas of the Hanford Site on the National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of Feasibility Study (FS) process for characterizing the nature and extent of contamination, assessing risks to human health and the environment, and selection of remedial actions. This report presents the results of an aggregate area management study (AIMS) for the B Plant Aggregate Area located in the 200 Areas. The study provides the basis for initiating RI/FS under CERCLA or under the Resource which contain reactor fuel processing and waste management Conservation and Recovery Act (RCRA) Facility Investigations (RFI) and Corrective Measures Studies (CMS). This report also integrates RCRA treatment, storage or disposal (TSD) closure activities with CERCLA and RCRA past-practice investigations

  3. Feasibility Study and Optimization of An Hybrid System (Eolian ...

    African Journals Online (AJOL)

    Feasibility Study and Optimization of An Hybrid System (Eolian- Photovoltaic - Diesel) With Provision of Electric Energy Completely Independent. ... reducing emissions of greenhouse gas (CO2 rate = 16086 kg / year for a system using only the generator diesel and is 599 kg / year for the stand alone hybrid system studied).

  4. District heating/cogeneration application studies for the Minneapolis-St Paul area. Executive summary; overall feasibility and economic viability for a district heating/new cogeneration system in Minneapolis-St. Paul

    Energy Technology Data Exchange (ETDEWEB)

    Margen, P.; Larsson, K.; Cronholm, L.A.; Marklund, J.E.

    1979-08-01

    A study was undertaken to determine the feasibility of introducing a large-scale, hot-water, district-heating system for the Minneapolis-St. Paul area. The analysis was based on modern European hot-water district-heating concepts in which cogeneration power plants supply the base-load thermal energy. Heat would be supplied from converted turbines of existing coal-fired power plants in Minneapolis and St. Paul. Toward the end of the 20-year development period, one or two new cogeneration units would be required. Thus, the district-heating system could use low-grade heat from either coal-fired or nuclear cogeneration power stations to replace the space-heating fuels currently used - natural gas and distillate oil. The following conclusions can be drawn: the concept is technically feasible, it has great value for fuel conservation, and with appropriate financing the system is economically viable.

  5. Feasibility study for retrofitting biogas cogeneration systems to district heating in South Korea.

    Science.gov (United States)

    Chung, Mo; Park, Hwa-Choon

    2015-08-01

    A feasibility study was performed to assess the technical and economic merits of retrofitting biogas-based cogeneration systems to district heating networks. Three district heating plants were selected as candidates for accommodating heat recovery from nearby waste treatment stations, where a massive amount of biogas can be produced on a regular basis. The scenario involves constructing cogeneration systems in each waste treatment station and producing electricity and heat. The amounts of biogas production for each station are estimated based on the monthly treatment capacities surveyed over the most recent years. Heat produced by the cogeneration system is first consumed on site by the waste treatment system to keep the operating temperature at a proper level. If surplus heat is available, it will be transported to the nearest district heating plant. The year-round operation of the cogeneration system was simulated to estimate the electricity and heat production. We considered cost associated with the installation of the cogeneration system and piping as initial investments. Profits from selling electricity and recovering heat are counted as income, while costs associated with buying biogas are expenses. Simple payback periods of 2-10 years were projected under the current economic conditions of South Korea. We found that most of the proposed scenarios can contribute to both energy savings and environmental protection. © The Author(s) 2015.

  6. Feasibility Study on Solar District Heating in China

    DEFF Research Database (Denmark)

    Huang, Junpeng; Fan, Jianhua; Furbo, Simon

    This paper analyzes the feasibility of developing solar district heating (SDH) in China from the perspective of incentive policy, selections of technical route, regional adaptability and economic feasibility for clean heating. Based on the analyzation, this proposes a road map for the development...

  7. [Cambridge Conference on School Mathematics Feasibility Studies 9-13.

    Science.gov (United States)

    Cambridge Conference on School Mathematics, Newton, MA.

    These materials are a part of a series of studies sponsored by the Cambridge Conference on School Mathematics which reflects the ideas of CCSM regarding the goals and objectives for school mathematics K-12. Feasibility Studies 9-13 contain a wide range of topics. The following are the titles and brief descriptions of these studies. Number…

  8. Marine ecological habitat: A case study on projected thermal power plant around Dharamtar creek, India

    Digital Repository Service at National Institute of Oceanography (India)

    Kulkarni, V.A.; Naidu, V.S.; Jagtap, T.G.

    Estuaries and tidal creeks, harboring mangroves particularly, face tremendous anthropogenic pressures. Expansion of mega cities and the thermal power plants are generally proposed in the vicinity of estuaries and creek, due to the feasibility...

  9. Feasibility study on RI biochip Application to detection of risk factors of atherosclerosis

    International Nuclear Information System (INIS)

    Ko, Kyong Cheol; Choi, Mi Hee; Park, Sang Hyun; Cho, Kyung Hyun; Lee, Ki Teak

    2009-01-01

    Microarrays can be used to screen thousands of binding events in a parallel and high throughput fashion and are of major importance in discase diagnosis and drug discovery. The use of radioisotope is conventionally regarded as one of the most sensitive detection methods. Atherosclerosis is a common disorder affecting arterial blood vessels. It happens when fat, cholesterol, and other substances made in the arterial blood vessels form a hard substances called plaque. Lipoprotein-associated phospholipase A 2 (Lp-PLA 2 ), a phospholipase A 2 enzyme, is used as a marker for cardiac disease. The detection of Lp-PLA 2 was accomplished by using radioactive [ 3 H-acetyl] PAF as a substrate and a feasibility study on RI biochip application to detection of Lp-PLA 2 , a risk factors of atherosclerosis was performed. Inhibitive activity of a native plant extract was also determined by using the RI biochip. It was found to be applicable to a high-throughput screening of inhibitors for developing atherosclerosis therapeutic agents

  10. Space shuttle/food system study. Package feasibility study, modifications 3S, 4C and 5S

    Science.gov (United States)

    1974-01-01

    An optimum feeding system for the space shuttle was presented. This system consisted of all rehydratable type foods which were enclosed in a 4 in. x 4 in. x 1 in. flexible package. A feasibility follow-on study was conducted, and two acceptable, feasible prototypes for this package are described.

  11. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  12. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  13. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  14. Feasibility Analysis of a Seabed Filtration Intake System for the Shoaiba III Expansion Reverse Osmosis Plant

    KAUST Repository

    Rodríguez, Luis Raúl

    2012-06-01

    lead into the application of comparable seabed filter design concepts to supply the entire feed water requirement of the plant. Considerations for the construction of a seabed filter should include technical feasibility and life cycle assessment, i.e. capital costs, operating costs and environmental impacts.

  15. Nuclear plant life extension

    International Nuclear Information System (INIS)

    Negin, C.A.

    1989-01-01

    The nuclear power industry's addressing of life extension is a natural trend in the maturation of this technology after 20 years of commercial operation. With increasing emphasis on how plants are operated, and less on how to build them, attention is turning on to maximizing the use of these substantial investments. The first studies of life extension were conducted in the period from 1978 and 1982. These were motivated by the initiation, by the Nuclear Regulatory Commission (NRC), of studies to support decommissioning rulemaking. The basic conclusions of those early studies that life extension is feasible and worth pursuing have not been changed by the much more extensive investigations that have since been conducted. From an engineering perspective, life extension for nuclear plants is fundamentally the same as for fossil plants

  16. Seabed Filter Feasibility Study of Om Almisk Island

    KAUST Repository

    Sesler, Kathryn

    2012-06-01

    Freshwater access has always been and is continuing to be a severe problem in desert coastal regions, despite the fact that they have an unlimited supply of easily accessible saline water. Water desalination plants are well established and heavily relied upon throughout the Middle East, Saudi Arabia in particular. However, water desalination tends to be a very expensive and energy intensive solution to the problem. The transition from using open water intake systems and all of the pretreatment processes that they require, to using seabed water filters as an intake, would potentially reduce the lifetime costs, energy consumption, and environmental impacts commonly associated with water desalination. This is because the filtration process that the seabed filter generates, serves as sufficient pretreatment for seawater as well as eliminating any risk of entrainment or impingement of marine organisms. The main objective of this research is to conduct a feasibility study on Om Almisk Island, an island off the coast of King Abdullah University of Science and Technology (KAUST), to determine if it would be a suitable location to construct a seabed water filter as a replacement for the current open water intake. The Om Almisk Island site was evaluated through collection of sand samples over a radial grid around Om Almisk Island and sample analysis using grain size distribution, porosity, and hydraulic conductivity. The lack of mud, high hydraulic conductivity, proximity to KAUST, and the shallow waters of the sandy apron surrounding Om Almisk Island make this an ideal location for a seabed water filter to be used as an intake and pretreatment for the KAUST desalination plant. This location also has low tide change and the presence of benthic macrofauna to create bioturbation in the sediments, which could inhibit the growth of a schmutzdecke. If this biological layer forms, it could drastically reduce the hydraulic conductivity of the system. Due to the high hydraulic

  17. How to Train an Injured Brain? A Pilot Feasibility Study of Home-Based Computerized Cognitive Training.

    Science.gov (United States)

    Verhelst, Helena; Vander Linden, Catharine; Vingerhoets, Guy; Caeyenberghs, Karen

    2017-02-01

    Computerized cognitive training programs have previously shown to be effective in improving cognitive abilities in patients suffering from traumatic brain injury (TBI). These studies often focused on a single cognitive function or required expensive hardware, making it difficult to be used in a home-based environment. This pilot feasibility study aimed to evaluate the feasibility of a newly developed, home-based, computerized cognitive training program for adolescents who suffered from TBI. Additionally, feasibility of study design, procedures, and measurements were examined. Case series, longitudinal, pilot, feasibility intervention study with one baseline and two follow-up assessments. Nine feasibility outcome measures and criteria for success were defined, including accessibility, training motivation/user experience, technical smoothness, training compliance, participation willingness, participation rates, loss to follow-up, assessment timescale, and assessment procedures. Five adolescent patients (four boys, mean age = 16 years 7 months, standard deviation = 9 months) with moderate to severe TBI in the chronic stage were recruited and received 8 weeks of cognitive training with BrainGames. Effect sizes (Cohen's d) were calculated to determine possible training-related effects. The new cognitive training intervention, BrainGames, and study design and procedures proved to be feasible; all nine feasibility outcome criteria were met during this pilot feasibility study. Estimates of effect sizes showed small to very large effects on cognitive measures and questionnaires, which were retained after 6 months. Our pilot study shows that a longitudinal intervention study comprising our novel, computerized cognitive training program and two follow-up assessments is feasible in adolescents suffering from TBI in the chronic stage. Future studies with larger sample sizes will evaluate training-related effects on cognitive functions and underlying brain structures.

  18. The Use of Market Feasibility Studies in the Restaurant Industry for Small and Medium-sized Restaurants

    OpenAIRE

    Kolster, Maria

    2017-01-01

    The goals of this thesis are to provide the reader with new information about market feasibility studies in the restaurant industry and to design a market feasibility template for the international restaurant industry which can be used for small and medium-sized restaurants before entering the market. The objectives are to define the ideal factors of a market feasibility study for the international restaurant industry, to learn and become an expert in feasibility studies for the restaurant i...

  19. Feasibility Study for Applicability of the Wavelet Transform to Code Accuracy Quantification

    International Nuclear Information System (INIS)

    Kim, Jong Rok; Choi, Ki Yong

    2012-01-01

    A purpose of the assessment process of large thermal-hydraulic system codes is verifying their quality by comparing code predictions against experimental data. This process is essential for reliable safety analysis of nuclear power plants. Extensive experimental programs have been conducted in order to support the development and validation activities of best estimate thermal-hydraulic codes. So far, the Fast Fourier Transform Based Method (FFTBM) has been used widely for quantification of the prediction accuracy regardless of its limitation that it does not provide any time resolution for a local event. As alternative options, several time windowing methods (running average, short time Fourier transform, and etc.) can be utilized, but such time windowing methods also have a limitation of a fixed resolution. This limitation can be overcome by a wavelet transform because the resolution of the wavelet transform effectively varies in the time-frequency plane depending on choice of basic functions which are not necessarily sinusoidal. In this study, a feasibility of a new code accuracy quantification methodology using the wavelet transform is pursued

  20. Design and assessment of solar PV plant for girls hostel (GARGI of MNIT University, Jaipur city: A case study

    Directory of Open Access Journals (Sweden)

    Rahul Khatri

    2016-11-01

    Full Text Available In this paper designing and assessment of a solar PV plant for meeting the energy demand of girl’s hostel at MNIT University Jaipur city was analyzed. A solar PV plant was designed with its financial and environmental assessment considering recent market prices. All the aspects related to a solar PV plant were considered for financial feasibility of PV plant near this location. The different financial parameters which affect the financial feasibility of PV plant were considered i.e. discount rate, effective discount rate, rate of escalation of electricity cost, salvage value of the plant etc. The environmental aspect related with the energy generated with PV plant i.e. reduction in carbon emission and carbon credits earned was also considered. Result obtained with the assessment of the proposed plant with different discount rate and current rate of inflation shows that the max IRR 6.85% and NPV of $1,430,834 was obtained with a discount rate of 8% and an inflation rate of 7.23% when no land cost considered and if land cost was considered the maximum IRR was 1.96% and NPV of $630,833. Minimum discounted payback of the plant will be 13.4 years if inflation was considered.

  1. Feasibility study of structured diagnosis methods for functional dyspepsia in Korean medicine clinics

    Directory of Open Access Journals (Sweden)

    Jeong Hwan Park

    2017-12-01

    Full Text Available Background: Functional dyspepsia (FD is the seventh most common disease encountered in Korean medicine (KM clinics. Despite the large number of FD patients visiting KM clinics, the accumulated medical records have no utility in evidence development, due to being unstructured. This study aimed to construct a standard operating procedure (SOP with appropriate structured diagnostic methods for FD, and assess the feasibility for use in KM clinics. Methods: Two rounds of professional surveys were conducted by 10 Korean internal medicine professors to select the representative diagnostic methods. A feasibility study was conducted to evaluate compliance and time required for using the structured diagnostic methods by three specialists in two hospitals. Results: As per the results of the professional survey, five questionnaires and one basic diagnostic method were selected. An SOP was constructed based on the survey results, and a feasibility study showed that the SOP compliance score (out of 5 was 3.45 among the subjects, and 3.25 among the practitioners. The SOP was acceptable and was not deemed difficult to execute. The total execution time was 136.5 minutes, out of which the gastric emptying test time was 129 minutes. Conclusion: This feasibility study of the SOP with structured diagnostic methods for FD confirmed it was adequate for use in KM clinics. It is expected that these study findings will be helpful to clinicians who wish to conduct observational studies as well as to generate quantitative medical records to facilitate Big Data research. Keywords: Big Data, Dyspepsia, Korean medicine, Feasibility studies, Observational study

  2. Feasibility study of gasification of oil palm fronds

    Directory of Open Access Journals (Sweden)

    S.A. Sulaiman

    2015-12-01

    Full Text Available Considering the large and consistent supply, oil palm fronds could be a promising source of biomass energy through gasification. There is very scarce information on the characteristics of oil palm fronds, which is vital in deciding if such biomass is technically suitable for gasification. In the present work, the feasibility of oil palm fronds for biomass gasification is studied. The study is conducted experimentally via standard tests to determine their thermochemical characteristics. Ultimate analysis is conducted to determine the contents of carbon, nitrogen, hydrogen and sulphide in oil palm fronds. Proximate analysis is performed to identify the burning characteristics of the biomass. The energy content in the fronds is determined by using a bomb calorie meter and is around 18 MJ/kg. The ignitability of the fronds is also studied experimentally to assess the ease to start-up combustion of the fronds. The characteristics of the flame of the resulting syngas from gasification of oil palm fronds are qualitatively studied. Simulated syngas composition study reveals potentials of 22% CO, 1.3% H2, 18.5% CO2 and traces of CH4. The study is extended to computer simulation to predict composition of the syngas. It is found from this work that oil palm fronds are feasible for gasification and has a good potential as a renewable energy source.

  3. Feasibility study on reduction of greenhouse gas emissions at Thanlyin oil refinery by the modernization of existing facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The feasibility study was conducted on a project in Myanmar for the energy saving effect and reduction of the greenhouse gas emissions by introducing modern refining facilities in Thanlyin Refinery of Myanmar Petrochemical Enterprise. The project items selected as a result of the study are improvement in the heat recovery efficiency of crude distillation unit, improvement in the furnace efficiency of crude distillation unit and coker plant, improvement in the efficiency of power plant, reduction of steam loss, modernization of the cooling water system, recovery and reuse of off-gas and LPG in crude distillation unit, and modernization of intermediate products run-down system. The conceptual designs and studies on these items indicate that implementation of these projects could lead to energy saving of 25,844 tons/y as crude and CO2 emission abatement of 57,457 tons/y, 46% and 33% reduction from the baseline. The total expenses for all of these items are estimated at 4,300 million yen. These are judged to be promising projects, with estimated investment recovery period of 9 years and internal profit rate of 12.9%, when the special yen loans are available. (NEDO)

  4. Optical Coherence Tomography of the Breast: A Feasibility Study

    National Research Council Canada - National Science Library

    Connolly, James

    2003-01-01

    .... This novel imaging technology has the potential to improve cancer detection and diagnosis. The aim of this study was to determine the feasibility of applying OCT imaging to normal and pathologic human breast tissue, as well as other human tissues...

  5. Optical Coherence Tomography of the Breast: A Feasibility Study

    National Research Council Canada - National Science Library

    Connolly, James L

    2005-01-01

    .... This novel imaging technology has the potential to improve cancer detection and diagnosis. The aim of this study was to determine the feasibility of applying OCT imaging to normal and pathologic human breast tissue, as well as other human tissues...

  6. Depleted uranium concrete container feasibility study

    International Nuclear Information System (INIS)

    Haelsig, R.T.

    1994-09-01

    The purpose of this report is to consider the feasibility of using containers constructed of depleted uranium aggregate concrete (DUCRETE) to store and transport radioactive materials. The method for this study was to review the advantages and disadvantages of DUCRETE containers considering design requirements for potential applications. The author found that DUCRETE is a promising material for onsite storage containers, provided DUCRETE vessels can be certified for one-way transport to disposal sites. The author also found that DUCRETE multipurpose spent nuclear fuel storage/transport packages are technically viable, provided altered temperature acceptance limits can be developed for DUCRETE

  7. A feasibility assessment for incorporating of passive RHRS into large scale active PWR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S O; Sub, S Y; Kim, Y S; Chang, M H; Park, J K [Korea Atomic Energy Research Inst., Taejon (Korea, Republic of)

    1996-12-01

    A feasibility study was carried out for the possible incorporation of passive RHRS (Residual Heat Removal System) into a large-scale of active PWR plant. Four kinds of system configurations were considered. For each case its performance and impacts on plant safety, cost, licensing, operation and maintenance were evaluated. The evaluation came up with a finding of PRHRS with a gravity feed tank as most probable design concept. However, considering rearrangement of structure and pipe routing inside and outside containment, it is concluded that implementation of the PRHRS concept into well developed active plants is not desirable at present. (author). 6 refs, 7 figs, 1 tab.

  8. A feasibility assessment for incorporating of passive RHRS into large scale active PWR

    International Nuclear Information System (INIS)

    Kim, S.O.; Sub, S.Y.; Kim, Y.S.; Chang, M.H.; Park, J.K.

    1996-01-01

    A feasibility study was carried out for the possible incorporation of passive RHRS (Residual Heat Removal System) into a large-scale of active PWR plant. Four kinds of system configurations were considered. For each case its performance and impacts on plant safety, cost, licensing, operation and maintenance were evaluated. The evaluation came up with a finding of PRHRS with a gravity feed tank as most probable design concept. However, considering rearrangement of structure and pipe routing inside and outside containment, it is concluded that implementation of the PRHRS concept into well developed active plants is not desirable at present. (author). 6 refs, 7 figs, 1 tab

  9. Feasibility study on combining anaerobic digestion and biomass gasification to increase the production of biomethane

    International Nuclear Information System (INIS)

    Li, Hailong; Larsson, Eva; Thorin, Eva; Dahlquist, Erik; Yu, Xinhai

    2015-01-01

    Highlights: • Anaerobic digestion and biomass gasification are integrated. • The novel concept can produce much more biomethane. • The novel concept can improve the exergy efficiency. • The novel concept demonstrates a big potential of income increase. - Abstract: There is a rapid growing interest in using biomethane as fuel for transport applications. A new concept is proposed to combine anaerobic digestion and biomass gasification to produce biomethane. H 2 is separated from the syngas generated by biomass gasification in a membrane system, and then is used to upgrade raw biogas from anaerobic digestion. Simulations have been conducted based on the real operation data of one full scale biogas plant and one full scale biomass gasification plant in order to investigate the feasibility of the new concept. Results show that although less power and heat are generated compared to the gasification plant, which results in a lower overall efficiency, much more biomethane can be produced than the biogas plant; and the new concept can achieve a higher exergy efficiency. Due to the increasing price of biomethane, the novel concept demonstrates a big potential of income increase. For example, at a biomethane price of 12.74SEK/kg, the annual income can be increased by 5.3% compared to the total income of the biogas and gasification plant

  10. Computer-Based Job and Occupational Data Collection Methods: Feasibility Study

    National Research Council Canada - National Science Library

    Mitchell, Judith I

    1998-01-01

    .... The feasibility study was conducted to assess the operational and logistical problems involved with the development, implementation, and evaluation of computer-based job and occupational data collection methods...

  11. Construction monitoring constraints and challenges:A feasibility study

    OpenAIRE

    Fidler, Paul; Vardanega, Paul J; Long, Peter; Webb, Graham; Stehle, John; Middleton, Campbell

    2013-01-01

    This paper presents a study of the constraints and challenges faced by the authors when invited to study the feasibility of developing a monitoring system to provide specific information sought by the designer and contractor during the construction of the new 225m high, 48 storey steel-framed Leadenhall Building, located at 122 Leadenhall Street in London. The original goal of the study was to develop a system to assist with the active alignment of the building during construction, a key aim ...

  12. Lunar Wireless Power Transfer Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Freid, Sheldon [National Security Technologies, LLC. (NSTec), Mercury, NV (United States); Popovic, Zoya [Univ. of Colorado, Boulder, CO (United States); Beckett, David R. [Independent Consultant; Anderson, Scott R. [Independent Consultant; Mann, Diana [Independent Consultant; Walker, Stuart [Independent Consultant

    2008-03-01

    This study examines the feasibility of a multi-kilowatt wireless radio frequency (RF) power system to transfer power between lunar base facilities. Initial analyses, show that wireless power transfer (WPT) systems can be more efficient and less expensive than traditional wired approaches for certain lunar and terrestrial applications. The study includes evaluations of the fundamental limitations of lunar WPT systems, the interrelationships of possible operational parameters, and a baseline design approach for a notionial system that could be used in the near future to power remote facilities at a lunar base. Our notional system includes state-of-the-art photovoltaics (PVs), high-efficiency microwave transmitters, low-mass large-aperture high-power transmit antennas, high-efficiency large-area rectenna receiving arrays, and reconfigurable DC combining circuitry.

  13. Feasibility Study of Renewable Energy in Singapore

    OpenAIRE

    King, Sebastian; Wettergren, Per

    2011-01-01

    Singapore is a country that is currently highly dependent on import of oil and gas. In order to be able to shift into a more sustainable energy system, Singapore is investing in research regarding different technologies and systems so as to establish more sustainable energy solutions. Seeing how air-conditioning accounts for approximately 30 % of Singapore’s total energy consumption, a feasibility study is being conducted on whether an integrated system using a thermally active building syste...

  14. Assessment of the degradation efficiency of full-scale biogas plants: A comparative study of degradation indicators.

    Science.gov (United States)

    Li, Chao; Nges, Ivo Achu; Lu, Wenjing; Wang, Haoyu

    2017-11-01

    Increasing popularity and applications of the anaerobic digestion (AD) process has necessitated the development and identification of tools for obtaining reliable indicators of organic matter degradation rate and hence evaluate the process efficiency especially in full-scale, commercial biogas plants. In this study, four biogas plants (A1, A2, B and C) based on different feedstock, process configuration, scale and operational performance were selected and investigated. Results showed that the biochemical methane potential (BMP) based degradation rate could be use in incisively gauging process efficiency in lieu of the traditional degradation rate indicators. The BMP degradation rates ranged from 70 to 90% wherein plants A2 and C showed the highest throughput. This study, therefore, corroborates the feasibility of using the BMP degradation rate as a practical tool for evaluating process performance in full-scale biogas processes and spots light on the microbial diversity in full-scale biogas processes. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Feasibility of Hybrid Retrofits to Off-Grid Diesel Power Plants in the Philippines

    International Nuclear Information System (INIS)

    Abergas, R.L.; Barley, C.D.; Barruela, R.B.

    1999-01-01

    The Strategic Power Utilities Group (SPUG) of the National Power Corporation (NPC) in the Philippines owns and operates about 100 power plants, mostly fueled by diesel, ranging in energy production from about 15 kilowatt-hours (kWh)/day to 106,000 kWh/day. Reducing the consumption of diesel fuel in these plants, along with the associated financial losses, is a priority for SPUG. The purpose of this study is to estimate the potential fuel and cost savings that might be achieved by retrofitting hybrid power systems to these existing diesel plants. As used in this report, the term ''hybrid system'' refers to any combination of wind turbine generators (WTGs), photovoltaic (PV) modules, lead-acid batteries, and an AC/DC power converter (either an electronic inverter or a rotary converter), in addition to the existing diesel gensets. The resources available for this study did not permit a detailed design analysis for each of the plants. Instead, the following five-step process was used: 1.Tabulate some important characteristics of all the plants. 2.Group the plants into categories (six classes) with similar characteristics. 3.For each class of system, identify one plant that is representative of the class. 4.For each representative plant, perform a moderately detailed prefeasibility analysis of design options. 5.Summarize and interpret the results. The analysis of each representative plant involved the use of time-series computer simulation models to estimate the fuel usage, maintenance expenses, and cash flow resulting from various designs, and to search the domain of possible designs for the one leading to the lowest life-cycle cost. Cost items that would be unaffected by the retrofit, such as operator salaries and the capital cost of existing equipment, were not included in the analysis. Thus, the results are reported as levelized cost of energy (COE) savings: the difference between the cost of the existing diesel-only system and that of an optimized hybrid system

  16. Economic feasibility of district heating delivery from industrial excess heat: A case study of a Swedish petrochemical cluster

    International Nuclear Information System (INIS)

    Morandin, Matteo; Hackl, Roman; Harvey, Simon

    2014-01-01

    The present work discusses the potential and the economic feasibility of DH (district heating) delivery using industrial excess heat from a petrochemical cluster at the Swedish West Coast. Pinch Analysis was used for estimating the DH capacity targets and for estimating the cost of heat exchanger installation. A discounted cash flow rate of return of 10% was used as a criterion for identifying the minimum yearly DH delivery that should be guaranteed for a given DH capacity at different DH sales prices. The study was conducted for the current scenario in which no heat recovery is achieved between the cluster plants and for a possible future scenario in which 50% of the fuel currently used for heating purposes is saved by increasing the heat recovery at the site. The competition between excess heat export and local energy efficiency measures is also discussed in terms of CO 2 emission consequences. The maximum capacity of DH delivery amounts today to around 235 MW, which reduces to 110 MW in the future scenario of increased site heat recovery. The results of our analysis show that feasible conditions exist that make DH delivery profitable in the entire capacity range. - Highlights: • Pinch Analysis targeting approach and short-cut cost accounting procedure. • Economic analysis for different DH delivery capacities up to maximum targets. • Sensitivity analysis of heat sales prices. • Parallel plants and cluster wide heat collection systems considered. • Competition between cluster internal heat recovery and excess heat export is discussed

  17. ENGINEERING FEASIBILITY AND ECONOMICS OF CO2 SEQUESTRATION/USE ON AN EXISTING COAL-FIRED POWER PLANT: A LITERATURE REVIEW

    Energy Technology Data Exchange (ETDEWEB)

    Carl R. Bozzuto; Nsakala ya Nsakala

    2000-01-31

    The overall objective of this study is to evaluate the technical feasibility and the economics of alternate CO{sub 2} capture and sequestration/use technologies for retrofitting an existing pulverized coal-fired power plant. To accomplish this objective three alternative CO{sub 2} capture and sequestration systems will be evaluated to identify their impact on an existing boiler, associated boiler auxiliary components, overall plant operation and performance and power plant cost, including the cost of electricity. The three retrofit technologies that will be evaluated are as follows: (1) Coal combustion in air, followed by CO{sub 2} separation from flue gas with Kerr-McGee/ABB Lummus Global's commercial MEA-based absorption/stripping process. (2) Coal combustion in an O{sub 2}/CO{sub 2} environment with CO{sub 2} recycle. (3) Coal combustion in air with oxygen removal and CO{sub 2} captured by tertiary amines In support of this objective and execution of the evaluation of the three retrofit technologies a literature survey was conducted. It is presented in an ''annotated'' form, consistent with the following five sections: (1) Coal Combustion in O{sub 2}/CO{sub 2} Media; (2) Oxygen Separation Technologies; (3) Post Combustion CO{sub 2} Separation Technologies; (4) Potential Utilization of CO{sub 2}; and (5) CO{sub 2} Sequestration. The objective of the literature search was to determine if the three retrofit technologies proposed for this project continue to be sound choices. Additionally, a review of the literature would afford the opportunity to determine if other researchers have made significant progress in developing similar process technologies and, in that context, to revisit the current state-of-the-art. Results from this literature survey are summarized in the report.

  18. Economic Feasibility of Functional Meat Products for Commercial Production in India

    Directory of Open Access Journals (Sweden)

    Varalakshmi Kandanuri

    2017-07-01

    Full Text Available This paper analyses the production of functional chicken meat products from economic perspectives. It analyses and compares the economics and investment feasibility on different size groups of processing plants in India. The primary data on input use and output yield were taken from studies of NRCM and data was analysed using economic analysis and investment appraisal techniques like NPV, IRR(%, BC ratio, and Break even analysis. The results indicated that the cost of production of functional products was 5.2 and 5.18 and 4.59 US dollars per kg on small, medium and large scale units respectively. All the processing units are found to be economically feasible with NPV of US$ 12727, 64661 and 153703, IRR of 26%,31% and 42% and B-C ratio was estimated as 1.56, 1.78 and 2.29 for small, medium and large scale units respectively. Economies of scale is evident form all perspectives like production costs, profits, discounting measures and breakeven point. The study found the feasibility of functional meat products in India for commercial production.

  19. Computing with words to feasibility study of software projects

    Directory of Open Access Journals (Sweden)

    Marieta Peña Abreu

    2017-02-01

    Full Text Available Objective: This paper proposes a method to analyze the technical, commercial and social feasibility of software projects in environments of uncertainty. It allows working with multiple experts and multiple criteria and facilitates decision-making. Method: The proposal contains two phases, first the necessary information is collected and in second place projects are evaluated using 2-tuple linguistic representation model. The experts are selected by analyzing their curricular synthesis. The evaluation criteria are defined using the technique Focus Group and weighted in the interval (0,1 according to their importance. three domains are offered to express the preferences: numeric, interval-valued and linguistic. For aggregation extended arithmetic mean and weighted average extended are used, preventing the loss of information. A 2-tuple (feasibility, precision is obtained as a result for each project. Results: The evaluation of P1 project was a very high feasibility with -0,33 of precision. The P2 project obtained a high feasibility with 0,38 of precision and P3 project achieved a medium feasibility with -0,21 of precision. Conclusions: This method is favorable for software projects feasibility analysis with presence of multiple experts and criteria, in environments of uncertainty. It tries heterogeneous assessments without loss of information. Their results are consistent and useful for decision makers.

  20. Morbidity follow-up feasibility study

    International Nuclear Information System (INIS)

    Carpenter, M.

    1988-02-01

    The report reviews the available sources of data within Canada for undertaking morbidity follow-up studies to both supplement and complement studies using Canadian mortality data. Such studies would permit earlier detection and more sensitive measures of differences in risk for exposures to radiation and allow timely measures to be taken to minimize any occupational and environmental health risk to radiation workers. The technical feasibility of using these sources was reviewed using the criteria of adequate personal identifying information, automation of data records, file size and the accuracy of the morbidity diagnosis information. At the present time certain of the provincial cancer registry files meet these criteria best. A work plan was prepared suggesting a morbidity pilot study to clarify the role of occupational factors in the incidence of cancer among radiation workers using the Alberta Cancer Registry file and the National Dose Registry (NDR) file of radiation workers. For the longer term a full cohort study using the National Cancer Incidence Reporting System (NCIRS) and the NDR workers as the study population would provide information on all radiation workers on a national basis. A work plan was prepared and some initial format conversion of historical data was undertaken to begin developing the NCIRS into a data base suitable for long-term health studies

  1. Feasible mathematics II

    CERN Document Server

    Remmel, Jeffrey

    1995-01-01

    Perspicuity is part of proof. If the process by means of which I get a result were not surveyable, I might indeed make a note that this number is what comes out - but what fact is this supposed to confirm for me? I don't know 'what is supposed to come out' . . . . 1 -L. Wittgenstein A feasible computation uses small resources on an abstract computa­ tion device, such as a 'lUring machine or boolean circuit. Feasible math­ ematics concerns the study of feasible computations, using combinatorics and logic, as well as the study of feasibly presented mathematical structures such as groups, algebras, and so on. This volume contains contributions to feasible mathematics in three areas: computational complexity theory, proof theory and algebra, with substantial overlap between different fields. In computational complexity theory, the polynomial time hierarchy is characterized without the introduction of runtime bounds by the closure of certain initial functions under safe composition, predicative recursion on nota...

  2. Feasibility study of a contained pulsed nuclear propulsion engine

    International Nuclear Information System (INIS)

    Parlos, A.G.; Metzger, J.D.

    1994-01-01

    The result of a feasibility analysis of a contained pulsed nuclear propulsion (CPNP) engine concept utilizing the enormously dense energy generated by small nuclear detonations is presented in this article. This concept was initially proposed and studied in the 1950s and 1960s under the program name HELIOS. The current feasibility of the concept is based upon materials technology that has advanced to a state that allows the design of pressure vessels required to contain the blast associated with small nuclear detonations. The impulsive nature of the energy source provides the means for circumventing the materials thermal barriers that are inherent in steady-state nuclear propulsion concepts. The rapid energy transfer to the propellant results in high thrust levels for times less than 1 s following the detonation. The preliminary feasibility analysis using off-the-shelf materials technology appears to indicate that the CPNP concept can have thrust-to-weight ratios on the order of 1 or greater. Though the specific impulse is not a good indicator for impulsive engines, an operating-cycle averaged specific impulse of approximately 1000 or greater seconds was calculated. 16 refs

  3. Feasibility study on X-ray source with pinhole imaging method

    International Nuclear Information System (INIS)

    Qiu Rui; Li Junli

    2007-01-01

    In order to verify the feasibility of study on X-ray source with pinhole imaging method, and optimize the design of X-ray pinhole imaging system, an X-ray pinhole imaging equipment was set up. The change of image due to the change of the position and intensity of X-ray source was estimated with mathematical method and validated with experiment. The results show that the change of the spot position and gray of the spot is linearly related with the change of the position and intensity of X-ray source, so it is feasible to study X-ray source with pinhole imaging method in this application. The results provide some references for the design of X-ray pinhole imaging system. (authors)

  4. Battery energy storage market feasibility study

    International Nuclear Information System (INIS)

    Kraft, S.; Akhil, A.

    1997-07-01

    Under the sponsorship of the Department of Energy's Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories (SNL) contracted Frost and Sullivan to conduct a market feasibility study of energy storage systems. The study was designed specifically to quantify the energy storage market for utility applications. This study was based on the SNL Opportunities Analysis performed earlier. Many of the groups surveyed, which included electricity providers, battery energy storage vendors, regulators, consultants, and technology advocates, viewed energy storage as an important enabling technology to enable increased use of renewable energy and as a means to solve power quality and asset utilization issues. There are two versions of the document available, an expanded version (approximately 200 pages, SAND97-1275/2) and a short version (approximately 25 pages, SAND97-1275/1)

  5. Battery energy storage market feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Kraft, S. [Frost and Sullivan, Mountain View, CA (United States); Akhil, A. [Sandia National Labs., Albuquerque, NM (United States). Energy Storage Systems Analysis and Development Dept.

    1997-07-01

    Under the sponsorship of the Department of Energy`s Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories (SNL) contracted Frost and Sullivan to conduct a market feasibility study of energy storage systems. The study was designed specifically to quantify the energy storage market for utility applications. This study was based on the SNL Opportunities Analysis performed earlier. Many of the groups surveyed, which included electricity providers, battery energy storage vendors, regulators, consultants, and technology advocates, viewed energy storage as an important enabling technology to enable increased use of renewable energy and as a means to solve power quality and asset utilization issues. There are two versions of the document available, an expanded version (approximately 200 pages, SAND97-1275/2) and a short version (approximately 25 pages, SAND97-1275/1).

  6. Experiences of a feasibility study of children with albinism in Zimbabwe: a discussion paper.

    Science.gov (United States)

    Taylor, Julie S; Lund, Patricia

    2008-08-01

    Feasibility studies are often a helpful prelude to constructing fundable research proposals. Where the intended research is in a foreign country, focuses on a vulnerable population, and is aggravated by political and pragmatic challenges, feasibility studies become essential. Albinism, a genetic condition of reduced melanin synthesis, is a major public health issue in southern Africa. Whilst much is known about the health needs of children with albinism, little is understood about how to address these effectively in low income countries. Further, the child care and protection needs of children with albinism are largely unexplored. Zimbabwe's current political and economic climate presents additional challenges to research on the topic. The technical, economic, legal, collaborative, operational, schedule and political feasibilities (acronym TELCOSP) to undertaking a study on children with albinism in Zimbabwe were explored over a six week period of fieldwork in the country. Using the TELSCOSP framework allowed a deconstruction of each challenge to provide innovative solutions. The economic and legal feasibility aspects presented some difficulties that will require flexibility and perseverance to overcome. With the assistance of the local communities and people with albinism in Zimbabwe, the obstacles appear surmountable. The feasibility study provided a productive framework for addressing potential challenges in studying the needs of Zimbabwe's children living with albinism.

  7. Energy and nutrient recovery for munipal wastewater treatment : how to design a feasible plant layout?

    NARCIS (Netherlands)

    Khiewwijit, R.; Temmink, B.G.; Rijnaarts, H.H.M.; Keesman, K.J.

    2016-01-01

    Activated sludge systems are commonly used for robust and efficient treatment of municipal wastewater. However, these systems cannot achieve their maximum potential to recover valuable resources from wastewater. This study demonstrates a procedure to design a feasible novel configuration for

  8. Department of Energy interest and involvement in nuclear plant license renewal activities

    International Nuclear Information System (INIS)

    Bustard, L.D.; Harrison, D.L.

    1991-01-01

    Recognizing the importance of nuclear license renewal to the nation's energy strategy, the Department of Energy (DOE) initiated a plant lifetime improvement program during 1985 to determine the feasibility of the license renewal option for US nuclear plants. Initial activities of the DOE program focused on determining whether there were technical and economic obstacles that might preclude or limit the successful implementation of the license renewal option. To make this determination, DOE cosponsored with the Electric Power Research Institute (EPRI) pilot-plant efforts by Virginia Electric Power and Northern States Power. Both pilot-plant efforts concluded that life extension is technically and economically feasible. In parallel with the pilot-plant activities, DOE performed national economic studies that demonstrated the economic desirability of life extension. Having demonstrated the feasibility of life extension, DOE, in conjunction with EPRI, selected two lead plants to demonstrate the license renewal process. These lead plants are Yankee Atomic's Yankee Rowe facility and Northern States Power's Monticello facility. DOE also initiated activities to develop the technical and regulatory bases to support the license renewal process in the United States. DOE has recently identified nuclear plant license renewal to be an important element of its National Energy Strategy. This paper summarizes the significant results, conclusions, and ongoing activities of the DOE effort. 18 refs

  9. Feasibility study on the thorium fueled boiling water breeder reactor

    International Nuclear Information System (INIS)

    PetrusTakaki, N.

    2012-01-01

    The feasibility of (Th,U)O 2 fueled, boiling water breeder reactor based on conventional BWR technology has been studied. In order to determine the potential use of water cooled thorium reactor as a competitive breeder, this study evaluated criticality, breeding and void reactivity coefficient in response to changes made in MFR and fissile enrichments. The result of the study shows that while using light water as moderator, low moderator to fuel volume ratio (MFR=0.5), it was possible to breed fissile fuel in negative void reactivity condition. However the burnup value was lower than the value of the current LWR. On the other hand, heavy water cooled reactor shows relatively wider feasible breeding region, which lead into possibility of designing a core having better neutronic and economic performance than light water with negative void reactivity coefficient. (authors)

  10. Feasibility study on a cosmic-ray level gauge

    International Nuclear Information System (INIS)

    Matsuda, H.; Fukaya, M.; Minato, S.

    1989-01-01

    Cosmic-ray intensities were measured at the stairs in a subway station in Nagoya City, inside a tall concrete building and under a cylindrical water tank, to examine the feasibility of a cosmic-ray level gauge. The measured results agreed quite well with the theoretical calculations. These results show that a cosmic-ray level gauge is feasible. (author)

  11. Feasibility studies on cogeneration from industrial wood-processing residues in Ghana

    International Nuclear Information System (INIS)

    Brew-Hammond, A.; Atakora, S.B.

    1999-01-01

    Several feasibility studies have been undertaken on cogeneration from wood-processing industrial residues in Ghana; practically all concluded that it was not economically viable because of the low tariffs for electricity in Ghana (around 3.5 US cents per kWh) at the time. Tariffs have more than doubled since September 1998 and average tariffs for industrial consumers are now around 7-8 US cents/kWh. This paper reviews earlier studies and undertakes a sensitivity analysis to determine effects of the new tariff regime and the investment costs for co-generation projects. More detailed technical and economic feasibility studies are needed to prepare the ground for an investment programme in cogeneration from wood residues. (author)

  12. Final Report: Feasibility Study of Biomass in Snohomish County, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Daryl Williams (Tulalip Tribes); Ray Clark (Clark Group)

    2005-01-31

    This report and its attachments summarizes the results of a unique tribal-farmer cooperative study to evaluate the feasibility of building one or more regional anaerobic digestion systems in Snohomish County, Washington.

  13. Control system upgrades support better plant economics

    International Nuclear Information System (INIS)

    De Grosbois, J.; Hepburn, A.; Storey, H.; Basso, R.; Kumar, V.

    2002-01-01

    This paper (second in the series, see [1]) provides insight on how nuclear plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs through focused control system upgrades. An understanding of this relationship is necessary to properly assess the economics of plant refurbishment decisions. Traditional economic feasibility assessment methods such as benefit cost analysis (BCA), internal rate of return (IRR), benefit cost ratios (B/C), or payback analysis are often performed without full consideration of project alternatives, quantified benefits, and life cycle costing. Consideration must be given to not only capital cost and project risk, but also to the potential economic benefits of new technology and added functionality offered by plant upgrades. Recent experience shows that if upgrades are focused on priority objectives, and are effectively implemented, they can deliver significant payback over the life of the plant, sometimes orders of magnitude higher than their initial capital cost. The following discussion explores some of the key issues and rationale behind upgrade decisions and their impact on improved plant efficiency and reduced O and M costs. A subsequent paper will explain how the justification for these improvements can be captured in an economic analysis and feasibility study to support strategic decision-making in a plant refurbishment context. (author)

  14. Feasibility study for the redesign of MDOT's pavement management systems software.

    Science.gov (United States)

    2011-04-01

    In August of 2006 the Mississippi Department of Transportation (MDOT) initiated State Study No. 191, entitled Feasibility : Study for the Redesign of MDOTs Pavement Management System (PMS) Software. At the initiation of this study, the : Dep...

  15. Technical feasibility of krypton-85 storage in sodalite

    International Nuclear Information System (INIS)

    Benedict, R.W.; Christensen, A.B.; Del Debbio, J.A.; Keller, J.H.; Knecht, D.A.

    1979-01-01

    Based on these experimental results, the process that is technically feasible for a reference 2000 metric ton of heavy metal (MTHM) per year reprocessing plant producing approx. 17 MCi or approx. 190 m 3 at STP would encapsulate krypton at approx. 20 cm 3 /g from krypton at temperatures greater than 575 0 C and pressures greater than 1600 atm with one batch a day in a 58-L high pressure vessel. Based on preliminary measurements at 500 0 C, the same process also would be feasible for a 70% krypton and 30% xenon mixture. 7 figures

  16. 100-KR-1 Operable Unit focused feasibility study report

    International Nuclear Information System (INIS)

    1994-11-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives and the detailed analysis of alternatives. This focused feasibility study (FFS) was conducted for the 100-KR-1 Operable Unit at the Hanford Site in southeastern Washington. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the five sites (116-K-1 crib, 116-K-2 trench, 116-KE-4 and 116-KW-3 retention basins, and process effluent pipelines) associated with the 100-KR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste site. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  17. Sydlangeland Fjernvarme A.m.b.a. Feasibility study on 10-20.000 m{sup 3} pond heat storage[Denmark]; Sydlangeland Fjernvarme A.m.b.a. Forundersoegelse for 10-20.000 m{sup 3} damvarmelager

    Energy Technology Data Exchange (ETDEWEB)

    Visbjerg, L. [Sydlangeland Fjernvarme A.m.b.a. (Denmark); Wesenberg, C.; Bliksted, T. [NIRAS Raadgivende Ingenioerer og Planlaeggere A/S (Denmark); Porsvig, M. [Geoteknisk Institut (Denmark); Duer, K. [DTU, Solenergi Center Danmark (Denmark)

    2000-11-01

    The project includes siting analyses, geotechnical feasibility studies and evaluations of operating economy for establishing a seasonal heat storage carried out as a 10-20,000 m{sup 3} pilot pond heat storage at Sydlangeland straw-fired district heating plant. (EHS)

  18. A public policy aid for bioenergy investment: Case study of failed plants

    International Nuclear Information System (INIS)

    Gonzalez, Asa O.; Karali, Berna; Wetzstein, Michael E.

    2012-01-01

    Recent failures of renewable energy plants have raised concerns regarding government's role in providing credit subsidies and have harmed the long-run development of renewable energy. The major reason for these failures lies in government loan appraisers not having a model that addresses these root causes and instead relying on traditional net present value (NPV) analysis. What is required is a model representing entrepreneurs' investment decision processes when faced with uncertainty, irreversibility, and flexibility that characterize renewable energy investments. The aim is to develop such a model with a real options analysis (ROA) criterion as the foundation. A case study comparing NPV with ROA decisions for 50 and 100 million gallon ethanol plants is used as a basis for future development of a template government loan appraisers can use for evaluating the feasibility of renewable energy investments. - Highlights: ► The role net present value (NPV) analysis is investigated in failed ethanol plants. ► NPV optimal entry and exit margins are compared to real options approach (ROA). ► The entry–exit margin gap is smaller under the NPV than it is under the ROA. ► Government policymakers employing NPV tend to react aggressively to margin stimuli.

  19. Demonstration project: Oxy-fuel combustion at Callide-A plant

    Energy Technology Data Exchange (ETDEWEB)

    Makino, Keiji; Misawa, Nobuhiro; Kiga, Takashi; Spero, Chris

    2007-07-01

    Oxy-fuel combustion is expected to be one of the promising systems on CO2 recovery from pulverized-coal power plant, and enable the CO2 to be captured in a more cost-effective manner compared to other CO2 recover process. An Australia-Japan consortium was established in 2004 specifically for the purpose of conducting a feasibility study on the application of oxy-fuel combustion to an existing pulverized-coal power plant that is Callide-A power plant No.4 unit at 30MWe owned by CS Energy in Australia. One of the important components in this study has been the recent comparative testing of three Australian coals under both oxy-fuel and air combustion conditions using the IHI combustion test facilities. The tests have yielded a number of important outcomes including a good comparison of normal air with oxy-fuel combustion, significant reduction in NOx mass emission rates under oxy-fuel combustion. On the basis of the feasibility study, the project under Australia-Japan consortium is now under way for applying oxy-fuel combustion to an existing plant by way of demonstration. In this project, a demonstration plant of oxy-fuel combustion will be completed by the end of 2008. This project aims at recovering CO2 from an actual power plant for storage. (auth)

  20. Technical economic feasibility study for the implementation of a nuclear power plant for the production of electricity in Colombia

    International Nuclear Information System (INIS)

    Gonzales, David E.; Bolanos, Hernan G.; Mayorga, Manuel A.; Rodriguez, Edwin A.

    2013-01-01

    A study on the technical and economic feasibility will be used to implement a nuclear power in Colombia to generate electricity. To this will be searched if there are previous studies on this topic and what they concluded. The manner in which power is supplied will be discussed in a national level nowadays, its strengths and weaknesses. It will be investigated the legal norms that exists in the country on nuclear power and renewable energy sources, the standards established at world level, the nuclear accidents and the great examples. Providers will be sought on the world market nuclear equipment which serve to this purpose and the technical characteristics of these equipment will be discussed. The type of fuel used in nuclear reactors, its origin, method of production, specifications, availability and long-term and safe handling and final disposal are considered. safe handling of this technology and policy or international rules that will studied

  1. PWR decontamination feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Silliman, P.L.

    1978-12-18

    The decontamination work which has been accomplished is reviewed and it is concluded that it is worthwhile to investigate further four methods for decontamination for future demonstration. These are: dilute chemical; single stage strong chemical; redox processes; and redox/chemical in combination. Laboratory work is recommended to define the agents and processes for demonstration and to determine the effect of the solvents on PWR materials. The feasibility of Indian Point 1 for decontamination demonstrations is discussed, and it is shown that the system components of Indian Point 1 are well suited for use in demonstrations.

  2. PWR decontamination feasibility study

    International Nuclear Information System (INIS)

    Silliman, P.L.

    1978-01-01

    The decontamination work which has been accomplished is reviewed and it is concluded that it is worthwhile to investigate further four methods for decontamination for future demonstration. These are: dilute chemical; single stage strong chemical; redox processes; and redox/chemical in combination. Laboratory work is recommended to define the agents and processes for demonstration and to determine the effect of the solvents on PWR materials. The feasibility of Indian Point 1 for decontamination demonstrations is discussed, and it is shown that the system components of Indian Point 1 are well suited for use in demonstrations

  3. Livingston Parish Landfill Methane Recovery Project (Feasibility Study)

    Energy Technology Data Exchange (ETDEWEB)

    White, Steven

    2012-11-15

    The Woodside Landfill is owned by Livingston Parish, Louisiana and is operated under contract by Waste Management of Louisiana LLC. This public owner/private operator partnership is commonplace in the solid waste industry today. The landfill has been in operation since approximately 1988 and has a permitted capacity of approximately 41 million cubic yards. Based on an assumed in-place waste density of 0.94 ton per cubic yard, the landfill could have an expected design capacity of 39.3 million tons. The landfill does have an active landfill gas collection and control system (LFGCCS) in place because it meets the minimum thresholds for the New Source Performance Standards (NSPS). The initial LFGCS was installed prior to 2006 and subsequent phases were installed in 2007 and 2010. The Parish received a grant from the United States Department of Energy in 2009 to evaluate the potential for landfill gas recovery and utilization at the Woodside Landfill. This includes a technical and economic feasibility study of a project to install a landfill gas to energy (LFGTE) plant and to compare alternative technologies. The LFGTE plant can take the form of on-site electrical generation, a direct use/medium Btu option, or a high-Btu upgrade technology. The technical evaluation in Section 2 of this report concludes that landfill gas from the Woodside landfill is suitable for recovery and utilization. The financial evaluations in sections 3, 4, and 5 of this report provide financial estimates of the returns for various utilization technologies. The report concludes that the most economically viable project is the Electricity Generation option, subject to the Parish’s ability and willingness to allocate adequate cash for initial capital and/or to obtain debt financing. However, even this option does not present a solid return: by our estimates, there is a 19 year simple payback on the electricity generation option. All of the energy recovery options discussed in this report

  4. The Role of Feasibility Studies To Enhance The Natural Gas Industry

    International Nuclear Information System (INIS)

    Soliman, M.; Soliman, A.

    2004-01-01

    The purpose of this paper is to shred some light on the key issues of the gas projects feasibility studies and to answer on this question W hat is the impact of the economic, financial and marketing studies on the transmission and distribution gas project's feasibility studies in Egypt? One of the obstacles to a beneficial gas project developing is, undoubtedly, the lack of knowledge in developing countries of how to formulate a project in such a way that its potential profitability whether from a private or social viewpoint, can be estimated from as firm a basis as possible. While there has been some improvement in these areas, this is still broadly true. The basis for an efficient gas project should not only depend on technical and engineering skills, but also on sound economic, marketing, financial and legal studies and expertise. Along with these sophisticated studies, another difficult but equally important subject has to be deeply assessed, namely the element of risk. A common mis perception in the feasibility studies domain is that some people think that it should only answer the question of whether the project is profitable or not, while its main goal is to explore the question of whether the , project represents the best possible use of the limited (scarce).resources at the country's disposal (specialized manpower, capital, natural resources)

  5. Moroccan wind farm potential feasibility. Case study

    International Nuclear Information System (INIS)

    Nouri, Abdellatif; Ait Babram, Mohamed; Elwarraki, Elmostafa; Enzili, Mustapha

    2016-01-01

    Highlights: • A new methodology for the technical feasibility of wind farm potentials is proposed. • The wind resources of two different sites in Morocco are compared. • Comparison between short and long term data using multivariate analysis is made. • Geographic information system implementation. • A 10 MW wind farm is designed and optimized. - Abstract: The subject of this paper is the elaboration of a methodology to study the technical feasibility of a wind farm potential. The implementation of this methodology allows a comparison between the wind resources of two different sites in Morocco. One site is located in the region of Essaouira, whereas the other one is located in the region of Safi. The comparison is based on real wind data collected from two masts at the heights of 30, 50, and 60 m. Each of the masts is installed at one of the mentioned potential sites over a fixed time period, lasting fifteen months for the first site, and eight months for the second one. The aim is the determination of the most applicable site presenting a good potential for a statistical study in order to predict long-term wind behaviors. Thus, the geographical situation study of the chosen site including topography, roughness and obstacles, is carried out. Furthermore, the wind resource using data, generated by the measuring masts, is evaluated. Finally, the areas which present great wind potential are located and the wind farm turbine locations are optimized by using the WAsP software.

  6. Feasibility of multi-sector policy measures that create activity-friendly environments for children: results of a Delphi study

    Directory of Open Access Journals (Sweden)

    Aarts Marie-Jeanne

    2011-12-01

    Full Text Available Abstract Background Although multi-sector policy is a promising strategy to create environments that stimulate physical activity among children, little is known about the feasibility of such a multi-sector policy approach. The aims of this study were: to identify a set of tangible (multi-sector policy measures at the local level that address environmental characteristics related to physical activity among children; and to assess the feasibility of these measures, as perceived by local policy makers. Methods In four Dutch municipalities, a Delphi study was conducted among local policy makers of different policy sectors (public health, sports, youth and education, spatial planning/public space, traffic and transportation, and safety. In the first Delphi round, respondents generated a list of possible policy measures addressing three environmental correlates of physical activity among children (social cohesion, accessibility of facilities, and traffic safety. In the second Delphi round, policy makers weighted different feasibility aspects (political feasibility, cultural/community acceptability, technical feasibility, cost feasibility, and legal feasibility and assessed the feasibility of the policy measures derived from the first round. The third Delphi round was aimed at reaching consensus by feedback of group results. Finally, one overall feasibility score was calculated for each policy measure. Results Cultural/community acceptability, political feasibility, and cost feasibility were considered most important feasibility aspects. The Delphi studies yielded 16 feasible policy measures aimed at physical and social environmental correlates of physical activity among children. Less drastic policy measures were considered more feasible, whereas environmental policy measures were considered less feasible. Conclusions This study showed that the Delphi technique can be a useful tool in reaching consensus about feasible multi-sector policy measures. The

  7. Study the feasibility of hydrogen assisted renewable power for off-grid communities

    International Nuclear Information System (INIS)

    Wu, S.H.; Fleetwood, M.; Roberston, R.; Nielsen, N.

    2004-01-01

    Most Renewable energy sources lack the controllability and availability of conventional fossil fuel-based energy sources and therefore cannot meet load requirements of a community without a backup or storage system. The advances of hydrogen technologies enable these renewable energy options to supply power to remote communities relying on independent sources of electrical and other energy. The hydrogen assisted renewable power (HARP) concept promises to make renewable energy more practical and mainstream through the use of hydrogen based electrical generation systems. The study herein is the first of a multiphase project to investigate the benefits of HARP as an environmentally friendly replacement for diesel in the supply of electricity to off-grid communities and analyse its feasibility and suitability as a back-up power supply. A small-scale pilot project was selected and this study assesses the major elements of a plant required to integrate electrical generation system, hydrogen storage and hydrogen generation into a renewable energy generation system. Based on the available renewable energy profiles, a simulation model was developed to assist in selecting, integrating, and evaluating various configurations and operational scenarios. This paper describes the components of the proposed HARP system as well as its cost, benefits and opportunities for other applications. (author)

  8. Nuclear powered ships. Findings from a feasibility study

    International Nuclear Information System (INIS)

    Namikawa, Shunichiro; Maerli, Morten Bremer; Hoffmann, Peter Nyegaard; Brodin, Erik

    2011-01-01

    Nuclear shipping is attractive for several reasons, one of which is its positive effect on emissions (CO 2 , NOx and SOx). The benefits, however, do not come without risks of possible harmful effects on humans and wildlife. Nuclear ships set themselves apart from conventional ships, as well as from on-shore nuclear power-plants, on several counts. 1) The reactor-unit are non-stationary, and the reactor is subject to the ship motions. 2) Ship reactors must be compact due to space constraints. 3) Special design considerations are required to ensure reactor safety and security, as well as to enable refuelling. 4) A naval nuclear fuel cycle infrastructure for fuel fabrication, handling, and disposal is needed. Technological feasibility of nuclear shipping is by itself inconclusive to a expansion into civilian applications and use. Civilian nuclear propulsion needs to be commercially viable and politically acceptable. Appropriate legislation must be in place, and nuclear shipping concepts with proven safety records and highest possible nuclear proliferation-resistance must be established. Possible 'showstoppers' to a viable nuclear civilian shipping industry are outlined in the paper in view of Political, Technical, Regulatory, Commercial, Safety and Security aspects. Further, different types of ships with different propulsion system are compared in lights of life cycle cost and air emission. (author)

  9. Gold in plants

    International Nuclear Information System (INIS)

    Girling, C.A.; Peterson, P.J.

    1980-01-01

    Many plants have the ability to take up gold from the soil and to accumulate it in their tisssue. Advances have been made in understanding these processes to the point where their exploitation in the field of prospecting for gold appears practically feasible. Neutron activation analysis is used for the determination of the small quantities of gold in plants

  10. Symplicity multi-electrode radiofrequency renal denervation system feasibility study.

    Science.gov (United States)

    Whitbourn, Robert; Harding, Scott A; Walton, Antony

    2015-05-01

    The aim of this study was to test the safety and performance of the Symplicity™ multi-electrode radio-frequency renal denervation system which was designed to reduce procedure time during renal denervation. The multi-electrode radiofrequency renal denervation system feasibility study is a prospective, non-randomised, open label, feasibility study that enrolled 50 subjects with hypertension. The study utilises a new renal denervation catheter which contains an array of four electrodes mounted in a helical configuration at 90 degrees from each other to deliver radiofrequency energy simultaneously to all four renal artery quadrants for 60 seconds. The protocol specified one renal denervation treatment towards the distal end of each main renal artery with radiofrequency energy delivered for 60 seconds per treatment. Total treatment time for both renal arteries was two minutes. The 12-month change in office systolic blood pressure (SBP) and 24-hour SBP was -19.2±25.2 mmHg, prenal artery stenosis or hypertensive emergencies occurred. The Symplicity multi-electrode radiofrequency renal denervation system was associated with a significant reduction in SBP at 12 months and minimal complications whilst it also reduced procedure time. NCT01699529.

  11. Code of Conduct for wind-power projects - Feasibility study

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2009-02-01

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  12. MRS transfer facility feasibility study

    International Nuclear Information System (INIS)

    Jowdy, A.K.; Smith, R.I.

    1990-12-01

    Under contract to the US Department of Energy, Parsons was requested to evaluate the feasibility of building a simple hot cell (waste handling) transfer facility at the Monitored Retrievable Storage (MRS) site to facilitate acceptance of spent fuel into the Federal Waste Management System starting in early 1998. The Transfer Facility was intended to provide a receiving and transfer to storage capability at a relatively low throughput rate (approximately 500 MTU/yr) and to provide the recovery capability needed on the site in the event of a transport or storage cask seal failure during a period of about two years while the larger Spent Fuel Handling Building (SFHB) was being completed. Although the original study basis postulated an incremental addition to the larger, previously considered MRS configurations, study results show that the Transfer Facility may be capable of receiving and storing spent fuel at annual rates of 3000 MTU/yr or more, making a larger fuel handling structure unnecessary. In addition, the study analyses showed that the Transfer Facility could be constructed and put into service in 15--17 months and would cost less than the previous configurations. 2 figs., 2 tabs

  13. What is a pilot or feasibility study? A review of current practice and editorial policy

    Directory of Open Access Journals (Sweden)

    Cooper Cindy L

    2010-07-01

    Full Text Available Abstract Background In 2004, a review of pilot studies published in seven major medical journals during 2000-01 recommended that the statistical analysis of such studies should be either mainly descriptive or focus on sample size estimation, while results from hypothesis testing must be interpreted with caution. We revisited these journals to see whether the subsequent recommendations have changed the practice of reporting pilot studies. We also conducted a survey to identify the methodological components in registered research studies which are described as 'pilot' or 'feasibility' studies. We extended this survey to grant-awarding bodies and editors of medical journals to discover their policies regarding the function and reporting of pilot studies. Methods Papers from 2007-08 in seven medical journals were screened to retrieve published pilot studies. Reports of registered and completed studies on the UK Clinical Research Network (UKCRN Portfolio database were retrieved and scrutinized. Guidance on the conduct and reporting of pilot studies was retrieved from the websites of three grant giving bodies and seven journal editors were canvassed. Results 54 pilot or feasibility studies published in 2007-8 were found, of which 26 (48% were pilot studies of interventions and the remainder feasibility studies. The majority incorporated hypothesis-testing (81%, a control arm (69% and a randomization procedure (62%. Most (81% pointed towards the need for further research. Only 8 out of 90 pilot studies identified by the earlier review led to subsequent main studies. Twelve studies which were interventional pilot/feasibility studies and which included testing of some component of the research process were identified through the UKCRN Portfolio database. There was no clear distinction in use of the terms 'pilot' and 'feasibility'. Five journal editors replied to our entreaty. In general they were loathe to publish studies described as 'pilot'. Conclusion

  14. Power plant design study of a high aspect ratio Tokamak using a SiC composite structure

    International Nuclear Information System (INIS)

    Murakami, Y.; Takase, H.; Shinya, K.

    1998-01-01

    The DREAM (drastically easy maintenance) tokamak is a fusion power plant which is designed from the viewpoint of maintenance feasibility. For this purpose, the DREAM reactor uses a plasma with a very high aspect ratio (A) and adopts SiC as a structural material. The choice of SiC affects the design of the core plasma, i.e. large inboard shield thickness, low synchrotron radiation reflectivity, and small plasma elongation for positional stability. The objectives of this study are to explore the feasibility of a high-A device, such as a power plant, and to clarify the technological impact of SiC material on the plasma design. Plasma size is optimized by the physics guidelines similar to ITER. The plasma major and minor radii of DREAM are 16 m and 2 m, respectively, and the average neutron wall load is 2.5 MW m -2 , the maximum toroidal field is 20 T, and the fusion power is 5.5 GW. Steady-state operation is obtained with 50 MW of external current-drive power and 90% bootstrap current. The divertor heat load is estimated to be about 10 MW m -2 . A radiative divertor concept is adopted to achieve a low divertor plasma temperature. The DREAM tokamak concept is found to be a possible candidate for a future power plant with more than 5 GW of fusion power and an acceptable divertor condition. (orig.)

  15. Feasibility study for objective oriented design of system thermal hydraulic analysis program

    International Nuclear Information System (INIS)

    Chung, Bub Dong; Jeong, Jae Jun; Hwang, Moon Kyu

    2008-01-01

    The system safety analysis code, such as RELAP5, TRAC, CATHARE etc. have been developed based on Fortran language during the past few decades. Refactoring of conventional codes has been also performed to improve code readability and maintenance. However the programming paradigm in software technology has been changed to use objects oriented programming (OOP), which is based on several techniques, including encapsulation, modularity, polymorphism, and inheritance. In this work, objective oriented program for system safety analysis code has been tried utilizing modernized C language. The analysis, design, implementation and verification steps for OOP system code development are described with some implementation examples. The system code SYSTF based on three-fluid thermal hydraulic solver has been developed by OOP design. The verifications of feasibility are performed with simple fundamental problems and plant models. (author)

  16. Assessing the economic and environmental feasibility of utility scaled PV electricity production in the state of Georgia.

    Science.gov (United States)

    Taylor, Ruthie; Critttenden, John

    2012-01-01

    Photovoltaic (PV) technology, an increasingly popular source for renewable energy, is being deployed in places with solar insolation that is comparable to that in state of Georgia. This study assesses the feasibility and environmental impact of utility scale photovoltaic (PV) electricity production in Georgia by assessing the economic costs, avoided costs, health benefits, and environmental benefits. The cost of PV used in this study is 3.52 $/kW. The RETScreen model was employed to analyze the impact of incentives on the economic viability of the plants that produce 93 GWh, 371 GWh, and 1,484 GWh, respectively. 57% of the capital cost is required in the form of incentives or subsidies to make the projects economically feasible. The high estimated cost of cleaning the equivalent amount of emissions from a coal-fired power plant is $14.5 million, $58 million, and $232 million for a 50 MW, 200 MW, and 800 MW plant, respectively Avoided costs in health damages are estimated to be $28 million, $112 million, and $449 million and the numbers of jobs to be created are 2,500, 10,000, and 40,000 for 50 MW, 200 MW, and 800 MW plants, respectively. And, the cumulative value of renewable energy credits from a 50 MW, 200 MW, and a 800 MW plant are $59 million, $237 million, and $789 million, respectively.

  17. Fiscal 1998 research report. Improvement project of low-grade coals in Chongqing City, China for CO{sub 2} reduction (Feasibility study on the production business of coal- biomass briquette); 1998 nendo chosa hokokusho. CO{sub 2} sakugen no tame no Chuka Jinmin Kyowakoku Jukei chokkatsushi no teihin'i sekitanshitsu no kaizen project (Bio briquette seizo jigyo no chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the effect of introduction of production technology of coal-biomass briquette (Japanese coal improvement technology) in Chongqing City on reduction of greenhouse effect gases and acid rain causative substances, and sustainable economic growth. The study result on the feasibility of this project and reduction of greenhouse effect gases was summarized. In this feasibility study, Japan-China joint field survey, and both proximate and ultimate analyses of obtained raw materials were carried out. Based on the experimental result in the pilot briquette plant in Chongqing City, study was made on the necessary of the 1 Mtons/y class pilot plant in the pilot area including Nantong coal mine in Chongqing City, and the location, investment, production cost and distribution means of the plant. Based on the evaluation result on CO{sub 2} reduction effect, economical efficiency, environment effect and social effect, its urgency and effectiveness as international cooperation project by yen credit were also confirmed. It is extremely important to promote localization of the plant in the future. (NEDO)

  18. Fiscal 1998 research report. Improvement project of low-grade coals in Chongqing City, China for CO{sub 2} reduction (Feasibility study on the production business of coal- biomass briquette); 1998 nendo chosa hokokusho. CO{sub 2} sakugen no tame no Chuka Jinmin Kyowakoku Jukei chokkatsushi no teihin'i sekitanshitsu no kaizen project (Bio briquette seizo jigyo no chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the effect of introduction of production technology of coal-biomass briquette (Japanese coal improvement technology) in Chongqing City on reduction of greenhouse effect gases and acid rain causative substances, and sustainable economic growth. The study result on the feasibility of this project and reduction of greenhouse effect gases was summarized. In this feasibility study, Japan-China joint field survey, and both proximate and ultimate analyses of obtained raw materials were carried out. Based on the experimental result in the pilot briquette plant in Chongqing City, study was made on the necessary of the 1 Mtons/y class pilot plant in the pilot area including Nantong coal mine in Chongqing City, and the location, investment, production cost and distribution means of the plant. Based on the evaluation result on CO{sub 2} reduction effect, economical efficiency, environment effect and social effect, its urgency and effectiveness as international cooperation project by yen credit were also confirmed. It is extremely important to promote localization of the plant in the future. (NEDO)

  19. CONTRACT Study - CONservative TReatment of Appendicitis in Children (feasibility): study protocol for a randomised controlled Trial.

    Science.gov (United States)

    Hutchings, Natalie; Wood, Wendy; Reading, Isabel; Walker, Erin; Blazeby, Jane M; Van't Hoff, William; Young, Bridget; Crawley, Esther M; Eaton, Simon; Chorozoglou, Maria; Sherratt, Frances C; Beasant, Lucy; Corbett, Harriet; Stanton, Michael P; Grist, Simon; Dixon, Elizabeth; Hall, Nigel J

    2018-03-02

    Currently, the routine treatment for acute appendicitis in the United Kingdom is an appendicectomy. However, there is increasing scientific interest and research into non-operative treatment of appendicitis in adults and children. While a number of studies have investigated non-operative treatment of appendicitis in adults, this research cannot be applied to the paediatric population. Ultimately, we aim to perform a UK-based multicentre randomised controlled trial (RCT) to test the clinical and cost effectiveness of non-operative treatment of acute uncomplicated appendicitis in children, as compared with appendicectomy. First, we will undertake a feasibility study to assess the feasibility of performing such a trial. The study involves a feasibility RCT with a nested qualitative research to optimise recruitment as well as a health economic substudy. Children (aged 4-15 years inclusive) diagnosed with acute uncomplicated appendicitis that would normally be treated with an appendicectomy are eligible for the RCT. Exclusion criteria include clinical/radiological suspicion of perforated appendicitis, appendix mass or previous non-operative treatment of appendicitis. Participants will be randomised into one of two arms. Participants in the intervention arm are treated with antibiotics and regular clinical assessment to ensure clinical improvement. Participants in the control arm will receive appendicectomy. Randomisation will be minimised by age, sex, duration of symptoms and centre. Children and families who are approached for the RCT will be invited to participate in the embedded qualitative substudy, which includes recording of recruitment consultants and subsequent interviews with participants and non-participants and their families and recruiters. Analyses of these will inform interventions to optimise recruitment. The main study outcomes include recruitment rate (primary outcome), identification of strategies to optimise recruitment, performance of trial treatment

  20. Economic feasibility of biomass gasification for power generation in three selected communities of northwestern Ontario, Canada

    International Nuclear Information System (INIS)

    Upadhyay, Thakur Prasad; Shahi, Chander; Leitch, Mathew; Pulkki, Reino

    2012-01-01

    Biomass gasification is expected to be an attractive option among other competitive applications of biomass conversion for bio-energy. This study analyzes economic feasibility of biomass gasification power generating plants in three selected communities (Ignace, Nipigon and Kenora) of northwestern Ontario. The major variables considered in the model are harvesting and handling costs, logistic costs for biomass feedstock delivery and storage, capital costs of power plant by scales, operation and maintenance costs, labor costs, capital financing costs and other regulatory costs. GIS analysis was undertaken to estimate the distance class matrix to apportion the biomass feedstock supply side from different forest management units. Total cost per MW h power production at a 50 MW scale ranges from CAD 61.89 to CAD 63.79. Total cost per unit of electricity production decreases significantly as plant capacity increases due to economy of scale in the production system. Further, the locations of plants explained the cost variability. - Highlights: ► We model feasibility of gasification power plants in three rural communities. ► The variables considered in the model are logistics, operational and capital costs. ► Mean distance from each community to different forest units are estimated with GIS. ► Total cost per MWh at a 50 MW scale ranges from CAD 61.89 to CAD 63.79. ► Total cost decreases with increase in plant capacity.

  1. Plant life management study of Japanese nuclear power plants

    International Nuclear Information System (INIS)

    Fukuda, Toshihiko

    1999-01-01

    Already more than twenty-five years have passed since the first commercial LWR plant went into operation in Japan. In this situation, MITI and 3 electric utilities (Tokyo Electric Power Company, Kansai Electric Power Co., Inc, Japan Atomic Power Company) have started a plant life management (PLM) study from 1994 to evaluate the long-term integrity of major systems, structures and components of aged LWR plants and ensure the safe, steady and highly reliable long-term operation. It consists of two phases: part 1 study and part 2 study. The part 1 study started in 1994 and focused on seven typical safety-related components. The part 1 study reports were made public in 1996. The part 2 study started in 1997. In this study we reviewed not only safety-related components but also plant reliability related components. The part 2 study reports were opened to the public in February 1999. This paper shows a summary of the part 2 study and our future PLM program. (author)

  2. A feasibility study on the vitrification of low-level radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Song, Myung Jae; Park, Jong Kil; Ahn, Hee Jin [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center; Cho, Jeong Mi; Choe, Young Son; Cho, Myeong Ryul [Hankuk Fiber Group (Korea, Republic of)

    1995-12-31

    A Study was carried out to investigate the feasibility of vitrification for low-and medium-level radioactive waste(LMLW). In order to understand maximum yearly generation volume and composition for each waste streams waste generation trends, which have been produced from nuclear power plants(PWR) in korea, were examined and then technical and economical assessment were performed based on the volume and composition. To select the most promising melters, technical characteristics were analyzed for several melters such as cold crucible melter heated by direct induction(CCM), cold crucible melter heated by vertical electrodes(CCVE), molten metal melter(MM), and plasma melter(PM) which were most likely to be applied to LMLW treatment. Economical assessment was carried out for several treatment strategies with selected melters and resulted in that it was desirable that non-combustibles and spent filter were vitrified with PM, and the others with CCM. For the demonstration of vitrification possibility for protective clothing, vinyl seats, spent resin, and evaporator bottoms, the surrogated wastes were paralyzed or dried at optimal conditions and than specimens contained various percentages of pyrolysis ash were prepared with lab. and pilot scale melters. Compressive strength for these specimens was measured to determine the maximum ash content in glass waste forms. (author). 27 refs., 88 figs.

  3. A feasibility study on the vitrification of low-level radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Song, Myung Jae; Park, Jong Kil; Ahn, Hee Jin [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center; Cho, Jeong Mi; Choe, Young Son; Cho, Myeong Ryul [Hankuk Fiber Group (Korea, Republic of)

    1996-12-31

    A Study was carried out to investigate the feasibility of vitrification for low-and medium-level radioactive waste(LMLW). In order to understand maximum yearly generation volume and composition for each waste streams waste generation trends, which have been produced from nuclear power plants(PWR) in korea, were examined and then technical and economical assessment were performed based on the volume and composition. To select the most promising melters, technical characteristics were analyzed for several melters such as cold crucible melter heated by direct induction(CCM), cold crucible melter heated by vertical electrodes(CCVE), molten metal melter(MM), and plasma melter(PM) which were most likely to be applied to LMLW treatment. Economical assessment was carried out for several treatment strategies with selected melters and resulted in that it was desirable that non-combustibles and spent filter were vitrified with PM, and the others with CCM. For the demonstration of vitrification possibility for protective clothing, vinyl seats, spent resin, and evaporator bottoms, the surrogated wastes were paralyzed or dried at optimal conditions and than specimens contained various percentages of pyrolysis ash were prepared with lab. and pilot scale melters. Compressive strength for these specimens was measured to determine the maximum ash content in glass waste forms. (author). 27 refs., 88 figs.

  4. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Bethlehem Steel Plant Brownfield Site in Lackawanna, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Bethlehem Steel Plant site in Lackawanna, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  5. Feasibility studies for the Forward Spectrometer

    International Nuclear Information System (INIS)

    Biernat, Jacek

    2015-01-01

    The Forward Spectrometer designed for the P-barANDA detector will consist of many different detector systems allowing for precise track reconstruction and particle identification. Feasibility studies for Forward Spectrometer done by means of specific reactions will be presented. In the first part of the paper, results of simulations focussing on rate estimates of the tracking stations based on straw tubes will be presented. Next, the importance of the Forward Tracker will be demonstrated through the reconstruction of the ψ(4040) → DD-bar decay. Finally, results from the analysis of the experimental data collected with a straw tube prototype designed and constructed at the Research Center in Juelich will be discussed. (paper)

  6. Simulated geographic variations of plant species richness, evenness and abundance using climatic constraints on plant functional diversity

    International Nuclear Information System (INIS)

    Kleidon, Axel; Pavlick, Ryan; Reu, Bjoern; Adams, Jonathan

    2009-01-01

    Among the most pronounced large-scale geographic patterns of plant biodiversity are the increase in plant species richness towards the tropics, a more even distribution of the relative abundances of plant species in the tropics, and a nearly log-normal relative abundance distribution. Here we use an individual-based plant diversity model that relates climatic constraints to feasible plant growth strategies to show that all three basic diversity patterns can be predicted merely from the climatic constraints acting upon plant ecophysiological trade-offs. Our model predicts that towards objectively 'harsher' environments, the range of feasible growth strategies resulting in reproductive plants is reduced, thus resulting in lower functional plant species richness. The reduction of evenness is attributed to a more rapid decline in productivity from the most productive to less productive plant growth strategies since the particular setup of the strategy becomes more important in maintaining high productivity in harsher environments. This approach is also able to reproduce the increase in the deviation from a log-normal distribution towards more evenly distributed communities of the tropics. Our results imply that these general biodiversity relationships can be understood primarily by considering the climatic constraints on plant ecophysiological trade-offs.

  7. Feasibility study on utilization of radiation from spent fuel in storage facility

    International Nuclear Information System (INIS)

    Wataru, Masumi; Sakamoto, Kazuaki; Saegusa, Toshiari; Sakaya, Tadatsugu; Fujiwara, Hiroaki.

    1997-01-01

    Spent fuels of nuclear power plant are stored safely until reprocessing because they are radioactive in addition to energy resources. It is foreseen that the amount of the stored spent fuel increases in the long term. Therefore, in the government, discussion on the storage away from reactor is in progress as well as one at reactor. Spent fuel emits a radioactive ray for a long time. In the storage facility, radiation is shielded not to have a detrimental influence upon the health and environment. If radioactive ray is incorrectly handled, it is hazardous for the health and the environment. But, it is very useful if it is properly utilized under a careful management. In the industry, radioactive ray by isotopes (e.g. Co-60) is used widely. In a view of the effective utilization of energy, the promotion of the siting, the regional development and the creation of employment opportunities of local inhabitants, it is preferable to make use of radiation from the spent fuel. In this study, feasibility of utilization of radiation energy from the spent fuel in a storage facility was evaluated. (author)

  8. Feasibility study for new ecolabels according to ISO 14024 (type I) within the product group: small cogeneration plants; Machbarkeitsstudie fuer neue Umweltzeichen in Anlehnung an ISO 14024 (Type I) fuer die Produktgruppe: Kleine Blockheizkraftwerk-Module

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, E.; Hirschl, B.; Kaliske, J. [Institut fuer Oekologische Wirtschaftsforschung (IOEW) gGmbH, Berlin (Germany); Reese, I.; Grimpe, T. [Hamburg Gas Consult (HGC) GmbH (Germany)

    2000-11-02

    This study is a feasibility study according to ISO 14024. It deals with the question whether an ecolabel is suitable for small cogeneration plants and how concrete criteria for an ecolabel on cogeneration plants could be specified. The study began with a comprehensive market analysis in order to identify possible plants for which an ecolabel would make sense. In the main part of the study, the environmental relevance of the chosen plants was analysed. For this analysis, plant manufacturers were interviewed and a comparison between cogeneration plants and heating plants was carried out. On the basis of this analysis, it was possible to derive a number of criteria which were presented and discussed in an expert talk by various company representatives and experts in this field. As a result of the expert talk and the investigation process as a whole, the introduction of an ecolabel for small cogeneration plants can be recommended. The proposed certification principles comprise requirements regarding the compliance with directives, efficient energy use (electrical and overall efficiency factor under partial load and nominal load, mentioning the plant's supplementary energy consumption), emission values for CO, NO{sub x}, dust and organic substances, sound emissions, the offer of maintenance contracts, plant take back obligations, as well as requirements with regard to the operating instructions. The transcription of the label is proposed as 'Ecolabel. because energy-efficient'. Besides cogeneration plants based on engines, the study also focused on small stationary fuel cells. They are currently in the development phase and are tested within the scope of several field studies. Compared to conventional heating plants and cogeneration plants powered by engines, this new technology promises clear ecological advantages and constitutes a future alternative to engine powered equivalents. Faced by the current state of development and the limited quality of the

  9. A feasibility study of bridge deck deicing using geothermal energy.

    Science.gov (United States)

    2015-04-01

    In this study, we investigated the feasibility of a ground-coupled system that utilizes heat energy harvested from the ground for : deicing of bridge decks. Heat exchange is performed using circulation loops integrated into the deep foundations suppo...

  10. A feasibility study of educational tools for osteomalacia.

    Science.gov (United States)

    Waxman, R; Adebajo, A; Robinson, S; Walker, D; Johnson, M; Rahman, A; Samanta, A; Kumar, K; Raza, K; Helliwell, P

    2017-03-01

    Many people in the UK, particularly people of South Asian origin, are advised to supplement their vitamin D intake, yet most do not. This suggests an unmet educational need. The osteomalacia mind map was developed to meet this need. The mind map contains culturally sensitive images, translated into Urdu and made interactive on a DVD. This study explores the feasibility of a randomised controlled study to measure the effect of education on improving vitamin D knowledge and adherence. This was a pilot and feasibility study. Cluster randomisation was used to avoid inter person contamination. Two South Asian women's groups were recruited to receive information about osteomalacia either by interactive DVD or an Arthritis Research UK leaflet. Knowledge and compliance were tested before and after the educational interventions via a knowledge questionnaire and the measurement of vitamin D and parathormone levels. The groups were found to be mismatched for knowledge, educational attainment and language at baseline. There were also organisational difficulties and possible confounding due to different tutors and translators. The DVD group had high knowledge at baseline which did not improve. The leaflet group had low knowledge at baseline that did improve. The DVD group had lower parathormone which did not change. The leaflet group had an increase in vitamin D but parathormone remained high. Performing a randomised study with this population utilising an educational intervention was difficult to execute. If cluster randomisation is used, extreme care must be taken to match the groups at baseline.

  11. Feasibility study of electric motors constructed with high temperature superconducting materials

    International Nuclear Information System (INIS)

    Jordan, H.E.

    1989-01-01

    The potential application of high temperature superconducting (HTSC) materials to electric motors is discussed. The specific application area of motors in electric power generating stations has been selected and a feasible study has been initiated on the use of HTSC materials in the design of motors for this application. A progress report on this feasibility study is presented. Technical challenges in both the development of HTSC wire and the design of a motor to utilize this wire are discussed. Finally, the results of design calculations comparing a superconducting motor with one of conventional design are presented assuming that success can be achieved in overcoming the technical problems which must be resolved to produce a high performance HTSC wire

  12. Feasibility studies for decommissioning

    International Nuclear Information System (INIS)

    Hladky, E.

    2000-01-01

    In this presentation author deals with planning of decommission of the NPPs A1, V1 and V2 Bohunice and Mochovce. It was concluded that: Used model for decommissioning parameters assessment has been suitable for elaboration of initial decommissioning plans (feasibility studies); Basic assessment of main decommissioning parameters and basic comparison of various decommissioning options have been possible; Improvement of the model and corresponding software is desirable and works on software improvement began one year ago; V1-NPP initial decommissioning plan should be actualized, because initial decommissioning plan does not correspond by its content and structure to requirements of Act No. 130/98 and Nuclear Regulatory Authority Degree No. 246/99; Strategy of radioactive wastes treatment and conditioning together with technical provisions at Jaslovske Bohunice site was changed in comparison with the assumptions in 1991-92; Considered V1 NPP decommissioning options are necessary to be re-evaluated in accordance with latest development of knowledge and approaches to NPP decommissioning in the world; Specific unit costs are substantially and differentially changed in comparison with the assumptions in 1991-92; Necessity to take into account technical changes resulted from V1 NPP reconstruction. (author)

  13. Transvaginal uterosacral ligament hysteropexy: a retrospective feasibility study.

    Science.gov (United States)

    Milani, Rodolfo; Frigerio, Matteo; Manodoro, Stefano; Cola, Alice; Spelzini, Federico

    2017-01-01

    Uterine-sparing procedures could be attractive in patients concerned about preservation of fertility and change in corporeal image and sexuality. Transvaginal uterosacral hysteropexy can provide an alternative mesh-free technique for uterine suspension. This study aimed to evaluate the feasibility of transvaginal uterine suspension to uterosacral ligaments in terms of operative data, complications, midterm efficacy, and patient satisfaction. This retrospective study analyzed the first 20 cases of transvaginal hysteropexy through bilateral high uterosacral ligaments (modified Shull technique) performed in our Institution. Mean follow-up was 33.2 months. The procedure was performed in 84 ± 19 min ,and blood loss was 228 ± 139 ml. Three mild complications (15 %) were observed. Recurrence [Pelvic Organ Prolapse Quantification system (POP-Q) stage ≥ II was observed in five patients (25 %), and three of them (15 %) required reintervention. Mean Patient Global Impression of Improvement score was "much improved." Two woman (40 %) who had not fulfilled their childbearing desire obtained a pregnancy. Both underwent elective caesarean section at term. Transvaginal uterosacral hysteropexy appears a feasible mesh-free technique for apical support. This procedure can be indicated in women with the desire of preserving fertility or who prefer a uterine-sparing surgical option.

  14. 7 CFR 1980.442 - Feasibility studies.

    Science.gov (United States)

    2010-01-01

    ... management, nature and extent of market area, marketing plans for sale of projected output, extent of... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.442 Feasibility...

  15. 100-HR-2 Operable Unit Focused Feasibility study report

    International Nuclear Information System (INIS)

    1995-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Feasibility Study (FS) includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study (FFS) was conducted for the 100-HR-2 Operable Unit (OU) at the Hanford Site in southeastern Washington. This FFS constitutes the Phase 3 portion of the FS process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The objective of this OU-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the seven IRM candidate sites associated with the 100-HR-2 OU. The IRM candidate waste sites identified in Table ES-1 are determined in the limited field investigation (DOE-RL 1994b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented. A summary for the 100-HR-2 IRM candidate waste site is as follows: none of the waste sites require additional alternative development. six of the seven waste sites directly plug into the waste site group alternatives. The site-specific detailed analysis is conducted, referencing the waste site group analysis as appropriate. A waste site detailed analysis summary is presented in Table ES-1.A comparative analysis of remedial alternatives is presented for each waste site. A summary of the comparative analysis is presented in Table ES-2

  16. The Pocos de Caldas project feasibility study: 1986-7

    International Nuclear Information System (INIS)

    Smellie, J.A.T.; Chapman, N.A.; Franca, E.P.

    1987-01-01

    This paper presents feasibility studies to investigate the uranium, thorium and rare earth deposits, in Morro do Ferro and the uranium mine in Osamu Utsumi, Brazil, as natural analogues to link rock geochemistry and hydrogeological systems to assess radionuclide mobility. Ore samples were analysed to obtain uranium concentrations and hydraulic tests were carried out. (UK)

  17. Feasibility study : identifying economic opportunities for bugwood and other biomass resources in Alberta and BC

    International Nuclear Information System (INIS)

    2008-04-01

    This feasibility study discussed energy technologies for biomass feedstocks including mill residues, roadside residues, and non-merchantable tree stands in Alberta and British Columbia (BC). The study demonstrated that the lack of mill residue resources means that targeted government support may be needed to help the energy industry to use more costly resources such as roadside residue or bugwood. Government policies are also needed to support the long-term availability of biomass supplies in order to lower the supply risks related to the use of biomass resources in the energy industry. Lower prices for power in both provinces make the use of biomass unfavourable for small-scale technologies under 10 MW. However, cogeneration projects using biomass showed higher returns when power conversion efficiency was low. Higher revenues were generated from heat sales displacing natural gas than from electricity sales at current tariffs. Large-scale biomass power plants were viable when lower-cost feedstocks were available. Bio-oils were suitable as supplements for heat generation in cogeneration processes. Pellet production was also viable using less expensive feedstocks.The co-firing of biomass at coal plants required little capital investment. The study demonstrated that Alberta's power production incentive of $60 per MWh was sufficient to improve the economics of small-scale projects. It was recommended that the program be continued and paid out over a period of 10 years. It was concluded that specific electricity tariffs and incentives are needed to accelerate regrowth and create a viable biomass industry for the future. 33 refs., 45 tabs., 17 figs

  18. Implications of the modelling of stratified hot water storage tanks in the simulation of CHP plants

    Energy Technology Data Exchange (ETDEWEB)

    Campos Celador, A., E-mail: alvaro.campos@ehu.es [ENEDI Research Group-University of the Basque Country, Departamento de Maquinas y Motores Termicos, E.T.S.I. de Bilbao Alameda de Urquijo, s/n 48013 Bilbao, Bizkaia (Spain); Odriozola, M.; Sala, J.M. [ENEDI Research Group-University of the Basque Country, Departamento de Maquinas y Motores Termicos, E.T.S.I. de Bilbao Alameda de Urquijo, s/n 48013 Bilbao, Bizkaia (Spain)

    2011-08-15

    Highlights: {yields} Three different modelling approaches for simulation of hot water tanks are presented. {yields} The three models are simulated within a residential cogeneration plant. {yields} Small differences in the results are found by an energy and exergy analysis. {yields} Big differences between the results are found by an advanced exergy analysis. {yields} Results on the feasibility study are explained by the advanced exergy analysis. - Abstract: This paper considers the effect that different hot water storage tank modelling approaches have on the global simulation of residential CHP plants as well as their impact on their economic feasibility. While a simplified assessment of the heat storage is usually considered in the feasibility studies of CHP plants in buildings, this paper deals with three different levels of modelling of the hot water tank: actual stratified model, ideal stratified model and fully mixed model. These three approaches are presented and comparatively evaluated under the same case of study, a cogeneration plant with thermal storage meeting the loads of an urbanisation located in the Bilbao metropolitan area (Spain). The case of study is simulated by TRNSYS for each one of the three modelling cases and the so obtained annual results are analysed from both a First and Second-Law-based viewpoint. While the global energy and exergy efficiencies of the plant for the three modelling cases agree quite well, important differences are found between the economic results of the feasibility study. These results can be predicted by means of an advanced exergy analysis of the storage tank considering the endogenous and exogenous exergy destruction terms caused by the hot water storage tank.

  19. Feasibility study on fission moly target development

    International Nuclear Information System (INIS)

    Kim, Byung Ku; Kim, Seong Nyun; Shon, Dong Seong; Choi, Chang Beom; Lee, Jae Kuk; Park, Jin Ho; Jeong, Won Myung; Jeon, Kwan Sik; You, Jae Hyung; Kang, Kyung Chul; Ahn, Jong Hwan; Ju, Po Kuk

    1996-01-01

    A multi-purpose research reactor, HANARO has been operated on the beginning of 1995 and can be utilized for production of various radioisotopes. And a R and D program for fission Mo production was established, and the technical and economical feasibility study has been performed for fission Mo production in Korea. In this study the process for fission Mo production was recommended as follows; 1. Target : UO 2 of annulus type. 2. Separation and purification : Nitric acid dissolution → Alumina adsorption → Benzoin oxime precipitation → Alumina adsorption. And more desirable plan for steady supply of fission Mo were suggested in following viewpoints; 1. Technical collaboration with foreign company. 2. Backup supply system. 3. Marketing arrangement. (Author)

  20. Feasibility Study for Paragon - Bisti Solar Ranch

    Energy Technology Data Exchange (ETDEWEB)

    Benally, Thomas [Navajo Hopi Land Commission Office (NHLCO), Window Rock, AZ (United States)

    2015-06-01

    The Navajo Hopi Land Commission Office (NHLCO) and Navajo Nation (NN) plan to develop renewable energy (RE) projects on the Paragon-Bisti Ranch (PBR) lands, set aside under the Navajo Hopi Land Settlement Act (NHLSA) for the benefit of Relocatees. This feasibility study (FS), which was funded under a grant from DOE’s Tribal Energy Program (TEP), was prepared in order to explore the development of the 22,000-acre PBR in northwestern New Mexico for solar energy facilities. Topics covered include: • Site Selection • Analysis of RE, and a Preliminary Design • Transmission, Interconnection Concerns and Export Markets • Financial and Economic Analysis • Environmental Study • Socioeconomic and Cultural Factors • Next Steps.

  1. Cadaveric surgery in core gynaecology training: a feasibility study.

    Science.gov (United States)

    Lim, Chou Phay; Roberts, Mark; Chalhoub, Tony; Waugh, Jason; Delegate, Laura

    2018-01-01

    Fresh frozen cadaver training has been proposed as a better model than virtual reality simulators in laparoscopy training. We aimed to explore the relationship between cadaveric surgical training and increased surgical confidence.To determine feasibility, we devised two 1-day cadaveric surgical training days targeted at trainees in obstetrics and gynaecology. Seven defined surgical skills were covered during the course of the day. The relationship between surgical training and surgical confidence was explored using both quantitative (confidence scores) and qualitative tools (questionnaires). Participants rated a consistent improvement in their level of confidence after the training. They universally found the experience positive and three overarching themes emerged from the qualitative analysis including self-concept, social persuasion and stability of task. It is pragmatically feasible to provide procedure-specific cadaveric surgical training alongside supervised clinical training. This small, non-generalisable study suggests that cadaveric training may contribute to an increase in surgical self-confidence and efficacy. This will form the basis of a larger study and needs to be explored in more depth with a larger population.

  2. Feasibility study for the European Reliability Data System (ERDS)

    International Nuclear Information System (INIS)

    Mancini, G.

    1980-01-01

    In the framework of the Reactor Safety Programme of the Commission of the European Communities, the JRC - Ispra Establishment has performed a feasibility study for an integrated European Reliability Data System, the aim of which is the collection and organization of information related to the operation of LWRs with regard to component and systems behaviour, abnormal occurrences, outages, etc. Component Event Data Bank (CEGB), Abnormal Occurrences Reporting System, Generic Reliability Parameter Data Bank, Operating Unit Status Reports and the main activities carried out during the last two years are described. The most important achievements are briefly reported, such as: Reference Classification for Systems, Components and Failure Events, Informatic Structure of the Pilot Experiment of the CEDB, Information Retrieval System for Abnormal Occurrences Reports, Data Bank on Component Reliability Parameters, System on the Exchange of Operation Experience of LWRs, Statistical Data Treatment. Finally, the general conclusions of the feasibility study are summarized: the possibility and the usefulness for the creation of an integrated European Reliability Data System are outlined. (author)

  3. A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation

    Energy Technology Data Exchange (ETDEWEB)

    Terry Battiest

    2012-11-30

    The project, A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation, is funded under a solicitation issued by the U.S. Department of Energy Tribal Energy Program. Funding provided by the grant allowed the Navajo Nation to measure wind potential at two sites, one located within the boundaries of the Navajo Nation and the other off-reservation during the project period (September 5, 2005 - September 30, 2009). The recipient for the grant award is the Navajo Tribal Utility Authority (NTUA). The grant allowed the Navajo Nation and NTUA manage the wind feasibility from initial site selection through the decision-making process to commit to a site for wind generation development. The grant activities help to develop human capacity at NTUA and help NTUA to engage in renewable energy generation activities, including not only wind but also solar and biomass. The final report also includes information about development activities regarding the sited included in the grant-funded feasibility study.

  4. Preliminary study on the feasibility of ductless fuel assembly for fast reactors

    International Nuclear Information System (INIS)

    Shibahara, Itaru; Enokido, Yuji

    1988-01-01

    Preliminary study on the feasibility of ductless fuel assembly for fast reactors has been conducted. The primary concern is with forecasting the thermal hydraulic characteristics and the heat removal efficiency from the core. The thermal hydraulic analysis revealed the coolant mixing in the core at steady state operating condition was not intensive and the coolant temperature increase was almost proportional to the power of each assembly. The hot spot analysis of the ductless core indicated that the hottest temperature in the core could be comparable with the temperature of the conventional ducted core, even in case the radial power flattening was not actively pursued but with adopting ducted radial blanket assemblies. Under off-normal conditions, the ductless core had improved heat removal capability which was caused by inter-assembly coolant flow. The study has indicated the feasibility of the ductless fuel assembly for fast reactors. The experiments to demonstrate the feasibility will be the next key process for the development. (author)

  5. Feasibility study for application of mixture working fluid cycle to nuclear reactor power plant

    International Nuclear Information System (INIS)

    Takeuchi, Yutaka; Ohshima, Iwao; Shiomi, Hirozo; Miyamae, Nobuhiko; Hiramatsu, Miki; Montani, Mitsuto

    1999-01-01

    There exists a large amount of unused energy in nuclear power plants. However, it consists of relatively low temperature energy, so it is difficult to generate electricity by the conventional water-steam cycle. In order to utilize such low temperature energy, we applied a mixture working fluid cycle called as the Kalina cycle to a light water nuclear reactor power plant. The Kalina cycle uses a working fluid composed of ammonia and water to create a variable temperature boiling process. We applied a saturation type Kalina cycle with single stage ammonia-water separation process as a bottoming cycle to a conventional water-steam cycle of a 1100MWe class BWR as an example case. The input heat source is the exhaust or the partial extraction of a low pressure turbine (LPT). A steady state chemical process modeling code ASPENPLUS was used for the sensitivity analyses. The maximum efficiency was calculated to be realized when using the lowest heat sink temperature, 8degC. The additional electrical output is about 95 MWe when using the exhaust of LPT and is about 127 MWe when using the partial extraction of LPT. Namely, about 4.3% of the exhaust heat for the former case and about 5.8% for the latter case can be utilized as electrical power, respectively. (author)

  6. Feasibility study on the modernization and expansion of the Tema Oil Refinery. Executive Summary. Export trade information

    International Nuclear Information System (INIS)

    Anon.

    1992-04-01

    The Tema Oil Refinery (TOR), which was commissioned in 1963, is a simple hydro-skimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years some of the equipment in the refinery has deteriorated or become obsolete necessitating major rehabilitation. A study of the refinery expansion project takes into consideration earlier studies and, equally important, recognizes the extensive work done by TOR in rehabilitating the refinery. The program, carried out in phases because of funding limitations, has addressed the critical repairs and replacements in the process units and utilities necessary to prolong the life of the refinery and assure reliability and safe operation. It undertook the task of investigating the feasibility of modernizing and expanding the refinery at Tema, Ghana to meet projected market demands until the year 2005. A process planning study was conducted to select the optimal process and utility configuration which would result in economic benefits to Ghana

  7. Anticipatory precrash restraint sensor feasibility study: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kercel, S.W.; Dress, W.B.

    1995-08-01

    This report explores feasibility of an anticipatory precrash restraint sensor. The foundation principle is the anticipation mechanism found at a primitive level of biological intelligence and originally formalized by the mathematical biologist Robert Rosen. A system based on formal anticipatory principles should significantly outperform conventional technologies. It offers the prospect of high payoff in prevention of death and injury. Sensors and processes are available to provide a good, fast, and inexpensive description of the present dynamical state of the vehicle to the embedded system model in the anticipation engine. The experimental part of this study found that inexpensive radar in a real-world setting does return useful data on target dynamics. The data produced by a radar system can be converted to target dynamical information by good, fast and inexpensive signal-processing techniques. Not only is the anticipatory sensor feasible, but further development under the sponsorship of the National Highway Traffic Safety Administration is necessary and desirable. There are a number of possible lines of follow-on investigation. The level of effort and expected benefits of various alternatives are discussed.

  8. Oak Ridge National Laboratory remedial investigation/feasibility study

    International Nuclear Information System (INIS)

    Glenn, R.D.; Hoffman, J.M.; Hyde, L.D.

    1988-01-01

    The Oak Ridge National Laboratory (ORNL) Remedial Investigation/ Feasibility Study (RI/FS) began in June 1987 to evaluate 13 contaminated waste area groupings (WAGs) to determine the feasibility and benefits of potential remedial action. The RI/FS and any future remedial action at ORNL will be of national significance and will likely lead to developments that will become models for environmental investigations and cleanups. Bechtel National, Inc. and a team of subcontractors will be working with Martin Marietta Energy systems to conduct intensive field investigations to obtain data required to evaluate the WAGs. The RI/F project continued in FY 1988 with project planning and preparation for field activities. Remedial Investigation (RI) Plans were prepared for 10 of the 13 WAGs. These plans were developed with sufficient information to ensure compliance with regulatory requirements, with intensive attention given to environmental, safety, and health protection; waste management; data management; and quality assurance. This paper reports on the progress made during FY 1988 and discusses activities planned for FY 1989

  9. Technical feasibility and carbon footprint of biochar co-production with tomato plant residue.

    Science.gov (United States)

    Llorach-Massana, Pere; Lopez-Capel, Elisa; Peña, Javier; Rieradevall, Joan; Montero, Juan Ignacio; Puy, Neus

    2017-09-01

    World tomato production is in the increase, generating large amounts of organic agricultural waste, which are currently incinerated or composted, releasing CO 2 into the atmosphere. Organic waste is not only produced from conventional but also urban agricultural practices due recently gained popularity. An alternative to current waste management practices and carbon sequestration opportunity is the production of biochar (thermally converted biomass) from tomato plant residues and use as a soil amendment. To address the real contribution of biochar for greenhouse gas mitigation, it is necessary to assess the whole life cycle from the production of the tomato biomass feedstock to the actual distribution and utilisation of the biochar produced in a regional context. This study is the first step to determine the technical and environmental potential of producing biochar from tomato plant (Solanum lycopersicum arawak variety) waste biomass and utilisation as a soil amendment. The study includes the characterisation of tomato plant residue as biochar feedstock (cellulose, hemicellulose, lignin and metal content); feedstock thermal stability; and the carbon footprint of biochar production under urban agriculture at pilot and small-scale plant, and conventional agriculture at large-scale plant. Tomato plant residue is a potentially suitable biochar feedstock under current European Certification based on its lignin content (19.7%) and low metal concentration. Biomass conversion yields of over 40%, 50% carbon stabilization and low pyrolysis temperature conditions (350-400°C) would be required for biochar production to sequester carbon under urban pilot scale conditions; while large-scale biochar production from conventional agricultural practices have not the potential to sequestrate carbon because its logistics, which could be improved. Therefore, the diversion of tomato biomass waste residue from incineration or composting to biochar production for use as a soil amendment

  10. Techno-economic feasibility study of the integration of a commercial small-scale ORC in a real case study

    International Nuclear Information System (INIS)

    Cavazzini, G.; Dal Toso, P.

    2015-01-01

    business model of considering not only the direct costs (unit costs, engineering, etc.), but mainly the indirect ones and hence the need of an appropriate business model, based on the simulation of the commercial ORC behavior, to evaluate its introduction in real industrial processes. In particular, in the specific case of a highly-efficient distillery plant, the ORC integration resulted to cause an increase in inner fuel consumption, represented by dried grape marc, with a consequent economic loss not offset by a significant increase in electricity auto-production. As a consequence, the ORC integration was not economically feasible in the considered case study due to the great value in the market of the dried grape marc

  11. Zumbro Hydroelectric Project: installation of third unit. Feasibility assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Williamson, James V.

    1979-03-01

    The feasibility of adding a third generating unit at an existing hydro power plant near Rochester, Minn. was examined considering the economic, technical, and environmental aspects. Installation of the unit, aiming at an Oct. 1983 completion date, is recommended. (LCL)

  12. Blanket handling concepts for future fusion power plants

    International Nuclear Information System (INIS)

    Bogusch, E.; Gottfried, R.; Maisonnier, D.

    2003-01-01

    In the frame of the power plant conceptual studies (PPCS) launched by the European Commission, two main blanket handling concepts have been investigated with respect to engineering feasibility and the impact on the plant availability and on cost: the large module handling concept (LMHC) and the large sector handling concept (LSHC). The LMHC has been considered as the reference handling concept while the LSHC has been considered as an attractive alternative to the LMHC due to its potential of smaller replacement times and hence increasing the plant availability. Although no principle feasibility issue has been identified, a number of engineering issues have been highlighted for the LSHC that would require considerable efforts for their resolution. Since its availability of about 77% based on a replacement time for all the internals of about 4.2 months is slightly lower than for the LMHC, the LMHC remains the reference blanket replacement concept for a conceptual reactor

  13. An inplementation strategy for the utilization of wind energy in Estonia. Phase 1: Pre-feasibility study and project identification. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This report presents the results of a pre-feasibility and project identification study with the purpose of investigating the possibilities for wind energy in Estonia and to recommend on possible actions, as outlined in Letters of Interest from the Estonian Ministries of Economy and Environment in 1995. Wind as source of energy in Estonia appears not yet to have been analyzed in detail. Available data indicates that wind can constitute a viable domestic source of energy, as average wind speeds of about 6 m/s (at 10 m) are reported at many coastal regions of Estonia. With state-of-the-art wind energy technology this means cost of wind produced electricity about 0.7-0.8 EEK/kWh - comparable to the cost of electricity from a modern coal-fired power plant. Two types of grids exist in these regions: On the mainland and on islands with sea cable grid connected wind turbines can be implemented. On islands without sea cable wind turbines can be connected to the diesel powered local grids. As a first step it is proposed to undertake the detailed planning and feasibility study of grid connected wind energy demonstrations in the framework of the Danish-Estonian country collaboration agreement. If the decision is made to implement this wind energy demonstration project, a certain proportion of grant money should be allocated for the demonstration. Subsequent steps in the Danish-Estonian country collaboration agreement should include the detailed planning and feasibility studies of autonomous wind energy demonstration and the associated capacity building. (EG)

  14. Neutronic feasibility of PWR core with mixed oxide fuels in the Republic of Korea

    International Nuclear Information System (INIS)

    Kim, Y.J.; Joo, H.K.; Jung, H.G.; Sohn, D.S.

    1997-01-01

    Neutronic feasibility of a PWR core with mixed oxide (MOX) fuels has been investigated as part of the feasibility study for recycling spent fuels in Korea. A typical 3-loop PWR with 900 MWe capacity is selected as reference plant to develop equilibrium core designs with low-leakage fuel management scheme, while incorporating various MOX loading. The fuel management analyses and limited safety analyses show that, safely stated, MOX recycling with 1/3 reload fraction can be accommodated for both annual and 18 month fuel cycle schemes in Korean PWRs, without major design modifications on the reactor systems. (author). 12 refs, 4 figs, 3 tabs

  15. Nasal Unit Transplantation: A Cadaveric Anatomical Feasibility Study.

    Science.gov (United States)

    Dorafshar, Amir H; Mundinger, Gerhard S; Robinson, Brent; Tuffaha, Sami; Brandacher, Gerald; Byrne, Patrick; Walton, Robert L

    2017-05-01

    Background  The science and technical acumen in the field of vascularized composite allotransplantation has progressed rapidly over the past 15 years, and transplantation of specialized units of the face, such as the nose, appears possible. No study to date has evaluated the technical feasibility of isolated nasal unit transplantation (NUT). In this study, we explore the anatomy and technical specifics of NUT. Methods  In this study, four fresh cadaver heads were studied. Bilateral vascular pedicle dissections were performed in each cadaver. The facial artery was cannulated and injected with food dye under physiologic pressure in two cadavers, and with lead oxide mixture in two cadavers to evaluate perfusion territories supplied by each vascular pedicle. Results  The facial artery and vein were found to be adequate pedicles for NUT. Divergent courses of the vein and artery were consistently identified, which made for a bulky pedicle with necessary inclusion of large amounts of subcutaneous tissue. In all cases, the artery remained superficial, while the vein coursed in a deeper plane, and demonstrated consistent anastomoses with the superior transverse orbital arcade. While zinc oxide injection of the facial artery demonstrated filling of the nasal vasculature across the midline, dye perfusion studies suggested that unilateral arterial inflow may be insufficient to perfuse contralateral NUT components. Discrepancies in these two studies underscore the limitations of nondynamic assessment of nutritive perfusion. Conclusion  NUT based on the facial artery and facial vein is technically feasible. Angiosome evaluation suggests that bilateral pedicle anastomoses may be required to ensure optimal perfusion. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  16. Present activity of the feasibility study of HTGR-GT system

    International Nuclear Information System (INIS)

    Muto, Y.; Miyamoto, Y.; Shiozawa, S.

    2001-01-01

    In JAERI a feasibility study of the High Temperature Gas-cooled Reactor-Gas Turbine (HTGR-GT) system has been carried out since January, 1997 as an assigned work by the Science and Technology Agency. The study aims at obtaining a promising concept of HTGR-GT system that yields a high thermal efficiency and at the same time is economically competitive. Designs of a few candidate systems will be undertaken and their power generation costs will be evaluated in parallel with design works, some experimental works such as the fabrication of a plate-fin type heat exchanger core and material tests will be carried out. The study will be continued till 2000 fiscal year. In 1997 fiscal year, a preliminary design of a direct cycle plant of 600 MWt was developed. A reactor inlet gas temperature of 460 deg. C, a reactor outlet gas temperature of 850 deg. C and a helium gas pressure of 6MPa were selected. Some advanced technologies were adopted such as a monolithic fuel compact and a control rod sheath made of carbon/carbon composite material. They were very effective to enhance the heat transfer of fuel and to reduce the core bypass flow. As a result, a power density of 6MW/m 3 and the maximum burnup of 10 5 MWD/ton were achieved. A single-shaft horizontal turbomachine of 3600 rpm was selected to ease the mechanical design of the rotor supported by magnetic bearings. The turbine, two compressors, a generator and six units of intercooler were placed in a turbine vessel, Plate-fin type recuperator and precooler are installed in a vertical heat exchanger vessel. By this design, a net thermal efficiency of 45.7% is expected to be achieved. To develop a high performance plate-fin recuperator, a core model of W200 mm x L200 mm x H200 mm with small fin size of 1.15 mm height was fabricated and as a result of tests, leak tightness, component strength and bonding appearance were found to be satisfactory. In 1998 fiscal year, a design of a direct cycle plant of 300 MWt is undertaken. The

  17. Feasibility study for a biodiesel refining facility in the Regional Municipality of Durham

    International Nuclear Information System (INIS)

    Villeneuve, S.; Saville, B.

    2006-02-01

    Although both public and political support for renewable fuels is currently strong, the next decade will determine if the biodiesel industry in North America will expand to make significant contributions to rural economic development and to improve urban air quality. The feasibility of establishing a biodiesel production facility in the Region of Durham, Ontario was investigated. The study included an assessment of potential sites, feedstock assessments, biodiesel market analysis, preliminary cost estimates and financial analysis. The purpose was to establish which feedstocks and technology options are viable and to document the underlying assumptions with historical data, cost estimates and projections. Six suitable sites in the region were evaluated. Two had access to feedstocks brought in by boat, but they were also among the furthest from existing rail lines, which increased the overall site development costs. A sensitivity analysis was conducted to determine the effect of land and site development costs on the return on investment (ROI). It was shown that a $2 MM difference in these costs affects the ROI by 3 to 4 per cent, but not enough to significantly influence the viability of a biodiesel plant in the region. The research and financial analysis revealed that Durham could potentially support a biodiesel production facility that produces up to 38 million litres per year of biodiesel from crude corn oil extracted from corn-to-ethanol processing facilities, supplemented by recycled fats, oils and greases. It was determined that the plant location may depend on access to infrastructure and community, or political acceptance. At $325 per tonne for crude oil, the projected average annual pre-tax ROI for a 38 MM litre per year biodiesel plant using only corn oil is 39 per cent sufficient to recommend a project. It was also determined that there is insufficient animal-derived material available locally to support a biodiesel production facility on recycled fats

  18. Telephone Care Management of Fall Risk:: A Feasibility Study.

    Science.gov (United States)

    Phelan, Elizabeth A; Pence, Maureen; Williams, Barbara; MacCornack, Frederick A

    2017-03-01

    Care management has been found to be more effective than usual care for some chronic conditions, but few studies have tested care management for prevention of elder falls. This study aimed to assess the feasibility and preliminary efficacy of telephone care management of older adults presenting for medical attention due to a fall. The setting was an independent practice association in western Washington serving 1,300 Medicare Advantage-insured patients. Patients aged ≥65 years treated for a fall in an emergency department or their primary care provider's office were contacted via telephone by a care manager within 48 hours of their fall-related visit and invited to participate in a telephone-administered interview to identify modifiable fall risk factors and receive recommendations and follow-up to address identified risk factors. Data from care manager records, patient medical records, and healthcare claims for the first 6 months (November 2009-April 2010) of program implementation were analyzed in 2011. The feasibility of screening and management of fall risk factors over the telephone and the effect on medically attended falls were assessed. Twenty-two patients eligible for fall care management were reached and administered the protocol. Administration took 15-20 minutes and integrated easily with the care manager's other responsibilities. Follow-through on recommendations varied, from 45% for those for whom exercise participation was recommended to 100% for other recommendations. No medically attended falls occurred over 6 months of follow-up. Telephone care management of fall risk appears feasible and may reduce falls requiring medical attention. Copyright © 2016 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  19. Study of waste-heat recovery and utilization at the Farmington Municipal Power Plant. Final report, December 1, 1980-June 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, G.G.; Edgel, W.R.; Feldman, K.T. Jr.; Moss, E.J.

    1982-03-01

    An examination was made of the technical and economc feasibility of utilizing waste heat from the Farmington Municipal Power Plant. First, the production cycles of the natural-gas-fired plant were assessed to determine the quantity and quality of recoverable waste heat created by the plant during its operation. Possibilities for utilizing waste heat from the exhaust gases and the cooling water were then reviewed. Hot water systems that can be used to retrieve heat from hot flue gases were investigated; the heated water can then be used for space heating of nearby buildings. The potential use of waste heat to operate a refrigeration plant was also analyzed. The use of discharged cooling water for hydroelectric generation was studied, as well as its application for commercial agricultural and aquaculture enterprises.

  20. Feasibility Study on Nano-structured Coatings to Mitigate Flow-accelerated Corrosion in Secondary System of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seunghyun; Kim, Jeong Won; Kim, Ji Hyun [Ulsan National Institute of Science and Technology, Banyeon-ri, Eonyang-eup, Ulju-gun, Ulsan (Korea, Republic of)

    2015-05-15

    There have been many efforts to mitigate FAC through the adoption of the advanced and modified water chemistries such as optimized dissolved oxygen (DO) concentration and temperature. However, these mitigation techniques pose certain challenges relating to the compatibility of new water chemistries with the steam generator, the thermal efficiency of the secondary side, etc. In this context, nano-particle reinforced electroless nickel plating (NP ENP) could help solve the FAC issues in secondary pipe systems. This does not require modification of water chemistry or structural materials, and hence, its application is reasonable and time-saving compared to previous FAC mitigation techniques. The main parameters of FAC are known as electrochemical reaction at the interface, dissolution of magnetite and ferrous ions due to concentration gradient between carbon steels and water and wear due to a fast-flowing fluid. High-temperature corrosion characteristics of the both coatings have potential as FAC barrier for carbon steel. Feasibility study will be carried out with FAC simulation experiments.

  1. Feasibility of the operation CFE`s conventional power plants for industrial cogeneration; Factibilidad de operar las centrales termoelectricas convencionales de la CFE para cogeneracion industrial

    Energy Technology Data Exchange (ETDEWEB)

    Buendia Dominguez, Eduardo H.; Acosta Torres, Rosa Aracely [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    An analysis is made on how cogeneration could help to maximize the power plant performance since thanks to cogeneration this type of power plants could utilize a part of the waste energy to be supplied to other processes. Also mention is made of the utilization of computer programs to help the design and the realization of functioning tests of this type of power plants. An economic evaluation is presented on the feasibility of operating this type of power plants as cogeneration units and it is concluded that the operation of fossil power plants in the cogeneration mode is not affected by the site where the power plant is located [Espanol] Se analiza como la cogeneracion podria ayudar a maximizar el rendimiento de las centrales termoelectricas ya que gracias a la cogeneracion este tipo de centrales podrian utilizar una parte de la energia desechada para suministrarla a otros procesos. Tambien se menciona la utilizacion de programas de computo para auxiliar en el diseno o realizacion de pruebas de funcionamiento sobre este tipo de plantas. Se presenta una evaluacion economica sobre la factibilidad de operar este tipo de plantas como unidades de cogeneracion y se concluye en que la operacion de centrales termoelectricas en modo de cogeneracion no se ve afectado por el sitio donde se encuentra la central

  2. Feasibility of the operation CFE`s conventional power plants for industrial cogeneration; Factibilidad de operar las centrales termoelectricas convencionales de la CFE para cogeneracion industrial

    Energy Technology Data Exchange (ETDEWEB)

    Buendia Dominguez, Eduardo H; Acosta Torres, Rosa Aracely [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    An analysis is made on how cogeneration could help to maximize the power plant performance since thanks to cogeneration this type of power plants could utilize a part of the waste energy to be supplied to other processes. Also mention is made of the utilization of computer programs to help the design and the realization of functioning tests of this type of power plants. An economic evaluation is presented on the feasibility of operating this type of power plants as cogeneration units and it is concluded that the operation of fossil power plants in the cogeneration mode is not affected by the site where the power plant is located [Espanol] Se analiza como la cogeneracion podria ayudar a maximizar el rendimiento de las centrales termoelectricas ya que gracias a la cogeneracion este tipo de centrales podrian utilizar una parte de la energia desechada para suministrarla a otros procesos. Tambien se menciona la utilizacion de programas de computo para auxiliar en el diseno o realizacion de pruebas de funcionamiento sobre este tipo de plantas. Se presenta una evaluacion economica sobre la factibilidad de operar este tipo de plantas como unidades de cogeneracion y se concluye en que la operacion de centrales termoelectricas en modo de cogeneracion no se ve afectado por el sitio donde se encuentra la central

  3. Retrofitting the potable water supply in Vira Gambarogno, Switzerland - Feasibility study of a small hydro power plant in the Muntin water reservoir; Risanamento dell'acquedotto Monti di Vira. Studio di fattibilita di recupero energetico al serbatoio Muntin

    Energy Technology Data Exchange (ETDEWEB)

    Mutti, M.

    2008-07-01

    This final report for the Swiss Federal Office of Energy describes the retrofitting project for the potable water supply in the municipality of Vira Gambarogno, Southern Switzerland. The current status of the scheme and three possible variants are presented, including the technical and financial aspects. In a second part of the report a feasibility study is reported on for the energetic use of the potable water falling down from the springs, located at 1040 m over sea level, and the Muntin water reservoir, located at 460 m about sea level. A small hydroelectric plant can be created at the entry of the reservoir, with an electric power of about 20 kW, depending on the variant considered. Estimated energy yield and cost figures are given.

  4. Geothermal application feasibility study for the New Mexico Institute of Mining and Technology Campus

    Energy Technology Data Exchange (ETDEWEB)

    Miller, A.R.

    1978-04-01

    This study was limited to determining the economic feasibility of providing the space heating, water heating, space cooling, and electrical power needs of New Mexico Tech from geothermal energy. The means of obtaining the required heat and water from the earth, and the possibility of corrosive effects were not part of this study. The results indicate that space heating and water heating are economically feasible if the cost of developing a geothermal source is not included. The major expense then is the pipeline used to convey the energy to the campus. calculations show that this cost is approximately two to three times our current annual heating bill, The study also showed that it would not be economically feasible to provide our relatively small space cooling and electrical energy needs from geothermal energy.

  5. Exoskeleton for Soldier Enhancement Systems Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Jansen, J.F.

    2000-09-28

    The development of a successful exoskeleton for human performance augmentation (EHPA) will require a multi-disciplinary systems approach based upon sound biomechanics, power generation and actuation systems, controls technology, and operator interfaces. The ability to integrate key components into a system that enhances performance without impeding operator mobility is essential. The purpose of this study and report are to address the issue of feasibility of building a fieldable EHPA. Previous efforts, while demonstrating progress and enhancing knowledge, have not approached the level required for a fully functional, fieldable system. It is doubtless that the technologies required for a successful exoskeleton have advanced, and some of them significantly. The question to be addressed in this report is have they advanced to the point of making a system feasible in the next three to five years? In this study, the key technologies required to successfully build an exoskeleton have been examined. The primary focus has been on the key technologies of power sources, actuators, and controls. Power sources, including internal combustion engines, fuel cells, batteries, super capacitors, and hybrid sources have been investigated and compared with respect to the exoskeleton application. Both conventional and non-conventional actuator technologies that could impact EHPA have been assessed. In addition to the current state of the art of actuators, the potential for near-term improvements using non-conventional actuators has also been addressed. Controls strategies, and their implication to the design approach, and the exoskeleton to soldier interface have also been investigated. In addition to these key subsystems and technologies, this report addresses technical concepts and issues relating to an integrated design. A recommended approach, based on the results of the study is also presented.

  6. FIRST FEASIBILITY STUDY FOR EXL WITH PROTOTYPE DETECTORS AT THE ESR AND DETECTOR SIMULATIONS

    NARCIS (Netherlands)

    Kalantar-Nayestanaki, N.; Moeini, H.; Mahjour-Shafiei, M.; Aksouh, F.; Beckert, K.; Beller, P.; Boretzky, K.; Chatillon, A.; Corsi, A.; Egelhof, P.; Emling, H.; Ickert, G.; Ilieva, S.; Kozhuharov, C.; Le Bleis, T.; Le Xuang, X. C.; Litvinov, Y.; Mahata, K.; Meier, J. P.; Nolden, F.; Popp, U.; Simon, H.; Steck, M.; Stoehlker, T.; Weick, H.; Zalite, A.; Kiselev, O.; Jourdan, J.; Kiselev, D.; Werthmueller, D.; Paschalis, S.

    This contribution presents some results from the first feasibility measurement performed at GSI using a 350 MeV/nucleon (136)Xe beam and a Hydrogen gas-jet target. In this feasibility study, one element of every possible detection part of the future EXL detection system was investigated. In

  7. Feasibility, safety, acceptability, and functional outcomes of playing Nintendo Wii Fit Plus™ for frail elderly: study protocol for a feasibility trial.

    Science.gov (United States)

    Gomes, Gisele Cristine Vieira; Bacha, Jéssica Maria Ribeiro; do Socorro Simões, Maria; Lin, Sumika Mori; Viveiro, Larissa Alamino Pereira; Varise, Eliana Maria; Filho, Wilson Jacob; Pompeu, José Eduardo

    2017-01-01

    Frailty can be defined as a medical syndrome with multiple causes and contributors, characterized by diminished strength and endurance and reduced physiological function that increases the vulnerability to develop functional dependency and/or death. Studies have shown that the most commonly studied exercise protocol for frail older adults is the multimodal training. Interactive video games (IVGs) involve tasks in virtual environments that combine physical and cognitive demands in an attractive and challenging way. The aim of this study will be to evaluate the feasibility, safety, acceptability, and functional outcomes of playing Nintendo Wii Fit Plus TM (NWFP) for frail older adults. The study is a randomized controlled, parallel group, feasibility trial. Participants will be randomly assigned to the experimental group (EG) and control group (CG). The EG will participate in 14 training sessions, each lasting 50 min, twice a week. In each training session, the participants will play five games, with three attempts at each game. The first attempt will be performed with the assistance of a physical therapist to correct the movements and posture of the patients and subsequent attempts will be performed independently. Scores achieved in the games will be recorded. The participants will be evaluated by a blinded physical therapist at three moments: before and after intervention and 30 days after the end of the intervention (follow-up). We will assess the feasibility, acceptability, safety, and clinical outcomes (postural control, gait, cognition, quality of life, mood, and fear of falling). Due to the deficiencies in multiple systems, studies have shown that multimodal interventions including motor-cognitive stimulation can improve the mobility of frail elderly adults. IVGs, among them the NWFP, are considered as a multimodal motor-cognitive intervention that can potentially improve motor and cognitive functions in the frail elderly. However, there is still no evidence

  8. Development of new port in Minahasa Utara: A-pre feasibility study

    Science.gov (United States)

    Hamzah, Suharman; Abdurahman, Asad; Saputra, Reza; Aprianti, Evi

    2017-11-01

    In order to support Indonesian Government priority sector to build toll maritime in conjunction to connect "nusantara" as an archipelago country, and also to develop the frontier area of Indonesia, the existence of a port should get more in attention as the gate of Indonesia. A port has significant role in changing of transport mode and at the end as catalyst of economic growth. An important thing from pre-feasibility studies is the priority factor will clearly shown wheather it is good or fair. As a supporting to service passenger moving, container, general cargo and also bulk, a port is necessary to have an excellent design and planning. A pre-feasibility study is required to obtain a scientific basis based on value of interest and the necessity of the region. A pre-feasibility study in this paper aims to identify potential support of the region and giving priority location of development of new port in Minahasa Utara regarding to spatial, government issues, transportation aspect, regional economics, environmental aspect and technical aspect consideration. Experimental Method used are qualitative and quantitative, going through to the data obtained and supported by interview on the spot as well as questionnaire surveys. Result of this paper showing that there are 5 locations suitable with the requirements. Based on the level of priority, high (Kema, Likupang), moderate (Linuhu, Kahuku) and low (Gangga 1).

  9. Feasibility study on the establishment of the IAEA international nuclear university

    International Nuclear Information System (INIS)

    Lee, E. J.; Kim, Y. T.; Nam, Y. M. and others

    2002-09-01

    The purpose of this project is to support 2002-2003 the IAEA project D.4.0.2, facilitating education, training and research in nuclear science and related fields, especially for a feasibility study on the establishment of the Agency sponsored International Nuclear University. Through this project, the abstract principle for a feasibility study on the establishment of the Agency sponsored International Nuclear university, which contains the new concepts and its objectives, principles to achieve the objectives, its curriculum outline and operation system, suggested project activities, was developed and submitted to the Agency. The Korean proposal were presented several times at the IAEA meetings and other international meetings related nuclear human resources development for understanding the necessity of a feasibility study on the establishment of the Agency sponsored international nuclear university with Member States. And the Korean proposal included such as the organization of a worldwide network using information and communication technology among Merber States' research institutes and training/education centers, curriculum outline and operation system of the INU will be produced. Also for further cooperation of the IAEA INU project implementation with the Agency, hosting IAEA INIS mirror site, establishment of the RCA region office, establishment of the INTEC at the Korean Atomic Energy Research Institute, and advanced curriculum of nuclear technology linked with NT, BT, ET, IT were made progress as a part of conceptualizing of the IAEA project

  10. Feasibility study on the development of proton accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Ki Hyung; Bang, Hyung Chan; Cho, Yong Sup [Seoul National University, Seoul (Korea, Republic of); Kim, Young Rak [Church Environment Research Institute, Seoul (Korea, Republic of); Nam Kung, Won; Cho, Moo Hyun [Pohang University of Science and Technology, Pohang (Korea, Republic of); Seo, Tae Suk [Cartolrik University, Seoul (Korea, Republic of); Woo, Hyung Joo [Nature Research Institute, Seoul (Korea, Republic of); Lee, Kyung Soo [Basic Study Research Institute, Seoul (Korea, Republic of); Lee, Hun Joo [Cheju National University, Cheju (Korea, Republic of); Chang, Soon Hong; Cho, Nam Jin [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of); Han, Jeon Kun [Sungkyunkwan University, Seoul (Korea, Republic of)

    1996-10-01

    A feasibility on the development of a high energy proton accelerator to be used for R and D in the nuclear field of korea was studied. The proposed one is a proton linac with parameters of about 1 GeV, 20 mA which can supply enough neutrons by the spallation reaction to drive a subcritical reactor. It= is expected to solve the intrinsic problem in the nuclear field such as safety, nuclear waste, proliferation and resource. The study was carried out through a multi-institutional cooperation of universities, institute and industry for a national consensus. 5 refs., 8 tabs., 8 figs. (author)

  11. Feasibility Study Analysis of Establishing Archery Sports Special Place

    Science.gov (United States)

    Tarigan, U. P. P.; Mardhatillah, A.; Budiman, I.; Sembiring, A. C.; Ramadhan, M. S.

    2018-04-01

    This study essentially discusses the basic concepts related to the decision and process of selecting a sports archery business project in order to provide economic and social benefits over time. Archery sports is a sport that requires special skills, both accuracy, coordination mental training and improves the physical condition of the prime. In Medan, it's still a bit of practice archery, but many people love this sport. From the data collected, there are three locations where archery in the city of the field of the Sunggal Knights is located at Jl Tunggul Hitam no.1A, Kec. Medan Sunggal, Avros Educational Park Aval address at Avros Street No.60 Medan, and the Knights of Johor Archery Club which is located at Jl. The work of Darma Gg. Ujung Family, Medan Johor. Therefore a feasibility study was undertaken in establishing an archery sports place in the field. The aspects to be considered in making feasibility studies are market and marketing aspects, technical and equipment aspects, management aspects, legal aspects, economic and social aspects, and financial aspects. Financial analysis using own capital got Payback Period 3 years 5,8 months, Net Present Value Rp 11.684.026 and obtained Internal Rate of Return of 17%.

  12. A neutron activation study of trace element contents in plants growing on soils of different acidity

    International Nuclear Information System (INIS)

    Caplan, J.; Loebersli, E.; Steinnes, E.; Naeumann, R.

    1987-01-01

    As a part of a research program on the influence of soil acidification on metal uptake in plants, the present work was carried out in order to investigate the feasibility of instrumental neutron activation analysis for this purpose. The work was restricted to elements yielding medium- or long-lived radionuclides on neutron activation. Elements studied include Na, Sc, Cr, Fe, Co, Zn, Br, Rb, Cs, Ba and La. The material analyzed was from a comparison of trace element contents in natural vegetation from corresponding coniferous forest locations in South Norway, which is considerably exposed to acidic deposition from long-range atmospheric transport, and Central Norway, which is far less affected. In particular, Rb and Cs show pronounced differences between the two regions regarding concentration levels in certain plant species. (author) 8 refs.; 4 figs

  13. A neutron activation study of trace element contents in plants growing on soils of different acidity

    International Nuclear Information System (INIS)

    Caplan, J.; Loebersli, E.; Naeumann, R.; Steinnes, E.

    1986-01-01

    As part of a research program on the influence of soil acidification on metal uptake in plants, the present work was carried out in order to investigate the feasibility of instrumental neutron activation analysis for this purpose. The work was restricted to elements yielding medium- or long-lived radionuclides on neutron activation. Elements studied include Na, Sc, Cr, Ge, Co, Zn, Br, Rb, Cs, Ba and La. The material analyzed was from a comparison of trace element contents in natural vegetation from corresponding coniferous forest locations in South Norway, which is considerably exposed to acidic deposition from long-range atmospheric transport, and Central Norway, which is far less affected. In particular Rb and Cs show pronounced differences between the two regions regarding concentration levels in certain plant species. (author)

  14. Feasibility study on commercialized fast reactor cycle systems. (1) Current status of the phase-II study

    International Nuclear Information System (INIS)

    Sagayama, Yutaka

    2005-01-01

    A feasibility study on commercialized fast reactors including related nuclear fuel cycle systems has been started from Japanese fiscal year 1999 by a Japanese joint project team of Japan Nuclear Cycle Development Institute and the Japan Atomic Power Company. This project aims at elucidating prominent fast reactor cycle systems that will respond to various needs of society in the future, together with economic competitiveness as future electricity supply systems. Challenging technology goals for the fast reactor cycle systems were defined in five targets: safety, economic competitiveness, reduction of environmental burden, efficient utilization of nuclear fuel resources and enhancement of nuclear non-proliferation. As the results of the feasibility study up to now, it is confirmed as the interim results that the combination of sodium-cooled fast reactors with oxide fuels, advanced aqueous reprocessing and simplified pellet fuel fabrication is highly suited to the development targets. The cost would be highly reduced by the adoption of innovative technologies, which feasibility is relatively clear and some R and D issues are now under progress. (author)

  15. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area at the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1999-01-01

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  16. Training Corrective Maintenance Performance on Electronic Equipment with CAI Terminals: I. A Feasibility Study.

    Science.gov (United States)

    Rigney, Joseph W.

    A report is given of a feasibility study in which several possible relationships between student, computer terminal, and electronic equipment were considered. The simplest of these configurations was set up and examined in terms of its feasibility for teaching the performance of fault localization on a Navy transceiver. An instructional program…

  17. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986

  18. Practice Study Outpatient Psychotherapy - Switzerland (PAP-S) : Study design and feasibility (Revised edition)

    OpenAIRE

    Wyl, Agnes von; Crameri, Aureliano; Koemeda, Margit; Tschuschke, Volker; Schulthess, Peter

    2016-01-01

    Revised edition of Von Wyl, A., Crameri, A., Koemeda, M., Tschuchke, V. & Schulthess, P. (2013). The PAP-S (Practice of Ambulant Psychotherapy-Study), Switzerland: Study Design and Feasibility. Zurich University of Applied Sciences, Zurich. The original article was published in German: von Wyl, A., Crameri, A., Koemeda, M., Tschuschke, V. & Schulthess, P. (2013). Praxisstudie ambulante Psychotherapie Schweiz (PAP-S): Studiendesign und Machbarkeit. Psychotherapie-Wissenschaft, 1, 6-22; op...

  19. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  20. Environmental efficiency among corn ethanol plants

    International Nuclear Information System (INIS)

    Sesmero, Juan P.; Perrin, Richard K.; Fulginiti, Lilyan E.

    2012-01-01

    Economic viability of the US corn ethanol industry depends on prices, technical and economic efficiency of plants and the extent of policy support. Public policy support is tied to the environmental efficiency of plants measured as their impact on emissions of greenhouse gases. This study evaluates the environmental efficiency of seven recently constructed ethanol plants in the North Central region of the US, using nonparametric data envelopment analysis (DEA). The minimum feasible level of GHG emissions per unit of ethanol is calculated for each plant and this level is decomposed into its technical and allocative sources. Results show that, on average, plants in our sample may be able to reduce GHG emissions by a maximum of 6% or by 2.94 Gg per quarter. Input and output allocations that maximize returns over operating costs (ROOC) are also found based on observed prices. The environmentally efficient allocation, the ROOC-maximizing allocation, and the observed allocation for each plant are combined to calculate economic (shadow) cost of reducing greenhouse gas emissions. These shadow costs gauge the extent to which there is a trade off or a complementarity between environmental and economic targets. Results reveal that, at current activity levels, plants may have room for simultaneous improvement of environmental efficiency and economic profitability. -- Highlights: ► Environmental efficiency of ethanol plants in the North Central US is evaluated. ► Economic (shadow) cost of reducing greenhouse gas emissions is calculated. ► Feasible changes in the mix of inputs and byproducts can reduce GHG emissions. ► On average plants may be able to reduce GHG emissions by 2.94 Gg per quarter. ► GHG reductions may be achieved at a moderate or zero operating cost.