  1. Pinellas Plant Environmental Baseline Report

    Energy Technology Data Exchange (ETDEWEB)

    1997-06-01

    The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

  2. U Plant Aggregate Area Management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document was prepared in support of an Aggregate Area Management Study of U Plant. It provides a technical baseline of the aggregate area and results from an environmental investigation that was undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC), which is currently the Waste Site and Facility Research Office, Natural Resources, Bechtel Hanford, Inc. (BHI). It is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. U Plant refers to the 221-U Process Canyon Building, a chemical separation facility constructed during World War II. It also includes the Uranium Oxide (UO 3 ) Plant constructed at the same time as 221-U as an adjunct to the original plutonium separation process but which, like 221-U, was converted for other missions. Waste sites are associated primarily with U Plant's 1952 through 1958 Uranium Metal Recovery Program mission and the U0 3 Plant's ongoing U0 3 mission. Waste sites include cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, a waste vault, and the lines and encasements that connect them. It also includes the U Pond and its feed ditches and an underground tank farm designed for high-level liquid wastes

  3. Ecotaxonmic baseline evaluation of the plant species in a ...

    African Journals Online (AJOL)

    The survey of the flora composition of an ecosystem is important in several environmental baseline studies. An ecotaxonomic assessment was carried out in Ase-Ndoni proposed Rivgas Refinery project site in other to find out the plant species of medicinal and other economic values. The investigation was carried out to ...

  4. Developing RESRAD-BASELINE for environmental baseline risk assessment

    International Nuclear Information System (INIS)

    Cheng, Jing-Jy.

    1995-01-01

    RESRAD-BASELINE is a computer code developed at Argonne developed at Argonne National Laboratory for the US Department of Energy (DOE) to perform both radiological and chemical risk assessments. The code implements the baseline risk assessment guidance of the US Environmental Protection Agency (EPA 1989). The computer code calculates (1) radiation doses and cancer risks from exposure to radioactive materials, and (2) hazard indexes and cancer risks from exposure to noncarcinogenic and carcinogenic chemicals, respectively. The user can enter measured or predicted environmental media concentrations from the graphic interface and can simulate different exposure scenarios by selecting the appropriate pathways and modifying the exposure parameters. The database used by PESRAD-BASELINE includes dose conversion factors and slope factors for radionuclides and toxicity information and properties for chemicals. The user can modify the database for use in the calculation. Sensitivity analysis can be performed while running the computer code to examine the influence of the input parameters. Use of RESRAD-BASELINE for risk analysis is easy, fast, and cost-saving. Furthermore, it ensures in consistency in methodology for both radiological and chemical risk analyses

  5. S Plant Aggregate Area Management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document is prepared in support of an Aggregate Area Management Study of S Plant, 200 West Area, at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. It provides a technical baseline of the aggregate area and the results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC). This document is based on review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. This report describes the REDOX facility and its waste sites, including cribs, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, underground tank farms designed for high-level liquid wastes, and the lines and encasements that connect them

  6. Geothermal environmental studies, Heber Region, Imperial Valley, California. Environmental baseline data acquisition. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    The Electric Power Research Institute (EPRI) has been studying the feasibility of a Low Salinity Hydrothermal Demonstration Plant as part of its Geothermal Energy Program. The Heber area of the Imperial Valley was selected as one of the candidate geothermal reservoirs. Documentation of the environmental conditions presently existing in the Heber area is required for assessment of environmental impacts of future development. An environmental baseline data acquisition program to compile available data on the environment of the Heber area is reported. The program included a review of pertinent existing literature, interviews with academic, governmental and private entities, combined with field investigations and meteorological monitoring to collect primary data. Results of the data acquisition program are compiled in terms of three elements: the physical, the biological and socioeconomic settings.

  7. Z plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document was prepared in support of the development of a Aggregate Area Management Study of Z Plant, 200 West Area, at the US Department of Energy (DOE) Hanford Site near Richland, Washington. It provides a technical description and operational history of the aggregate area and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC) which is currently the Waste Site and Facility Research Office, Natural Resources, Bechtel Hanford, Inc. (BHI). It is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted in support of this report

  8. B Plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    The B aggregate area is made up of 13 operable units; 200-BP 1 through 200-BP 1 1, 200-IU-6, and 200-SS-1 that consist of liquid and solid waste disposal sites in the vicinity of, and related to, B Plant operations. This report describes B Plant and its waste sites, including cribs, french drains, septic tanks and drain fields, trenches and ditches, ponds, catch tanks, settling tanks, diversion boxes, underground tank farms designed for high-level liquid wastes, and the lines and encasements that connect them. Each waste site in the aggregate area is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. This document provides a technical baseline of the aggregate area and results from an environmental investigation. This document is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted

  9. Environmental radioactivity levels, Browns Ferry Nuclear Plant. Annual report, 1985 (TVA/NUC SVS/RH)

    International Nuclear Information System (INIS)

    1986-04-01

    The preoperational environmental radiological monitoring program established a baseline of data on the distribution of natural and manmade radioactivity in the environment near the plant site. However, seasonal, yearly, and random variations in the data were observed. In order to determine the potential increases in environmental radioactivity levels caused by the plant, comparisons were made between data for indicator stations (those near the plant) and control stations (those remote from the plant) in conjunction with comparisons with preoperational data

  10. Waste Isolation Pilot Plant site environmental report for calendar year 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) monitors a comprehensive set of parameters in order to detect any potential environmental impacts and establish baselines for future quantitative environmental impact evaluations. Surface water and groundwater, soil, and biotics are measured for background radiation. Nonradiological environmental monitoring activities include meteorological, air quality, soil properties, and the status of the local biological community. Ecological studies focus on the immediate area surrounding the site with emphasis on the salt storage pile, whereas baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in a preoperational state, no waste has been received; therefore, certain elements required by Order DOE 5400.1 are not presented in this report. 15 figs. 19 tabs

  11. Waste Isolation Pilot Plant site environmental report for calendar year 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) monitors a comprehensive set of parameters in order to detect any potential environmental impacts and establish baselines for future quantitative environmental impact evaluations. Surface water and groundwater, soil, and biotics are measured for background radiation. Nonradiological environmental monitoring activities include meteorological, air quality, soil properties, and the status of the local biological community. Ecological studies focus on the immediate area surrounding the site with emphasis on the salt storage pile, whereas baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in a preoperational state, no waste has been received; therefore, certain elements required by Order DOE 5400.1 are not presented in this report. 15 figs. 19 tabs.

  12. Improving the environmental sustainability of a waste processing plant

    International Nuclear Information System (INIS)

    Turner, Tom; Watson, Stuart

    2013-01-01

    This paper describes how the level of environmental sustainability at the Solid Waste Processing plant at Research Sites Restoration Ltd (RSRL) Harwell was measured and improved. It provides reasons to improve environmental performance in an organisation, states best practice on how improvement should be conducted, and gives first-hand experience on how changes were implemented. In this paper sustainability is defined as 'meeting the needs of the present without compromising the ability of future generations to meet their own needs'. A baseline for environmental sustainability was created, by looking at multiple attributes. From this, a matrix was created to show how the baseline environmental performance compared to best practice, and a gap analysis was performed. Results from this analysis showed areas for potential systematic improvement, and actions were created. Nearly all actions were implemented within one year, and environmental sustainability improved significantly. Most improvements cost no money to implement, and the few that did had to pass criteria in a business case. Results from a company-wide survey showed that the vast majority of employees felt that environmental issues were important, and that they were willing to help improve performance. Environmental awareness training was given to everyone in the department, and individuals were given measurable improvement targets. A focus group was set up and met regularly to agree improvements and monitor results. Environmental performance was publicised regularly to highlight successes and seek further engagement and improvement. Improvement ideas were encouraged and managed in a transparent way which showed clear prioritisation and accountability. The culture of environmental improvement changed visibly and results at the end of the first year showed that electricity consumption had reduced by 12.5%, and gas consumption had reduced by 7.3%. In less than two years over UK Pound 60,000 was saved

  13. Improving the environmental sustainability of a waste processing plant

    Energy Technology Data Exchange (ETDEWEB)

    Turner, Tom [AREVA RMC, Abingdon, Oxfordshire (United Kingdom); Watson, Stuart [RSRL, Harwell, Oxfordshire (United Kingdom)

    2013-07-01

    This paper describes how the level of environmental sustainability at the Solid Waste Processing plant at Research Sites Restoration Ltd (RSRL) Harwell was measured and improved. It provides reasons to improve environmental performance in an organisation, states best practice on how improvement should be conducted, and gives first-hand experience on how changes were implemented. In this paper sustainability is defined as 'meeting the needs of the present without compromising the ability of future generations to meet their own needs'. A baseline for environmental sustainability was created, by looking at multiple attributes. From this, a matrix was created to show how the baseline environmental performance compared to best practice, and a gap analysis was performed. Results from this analysis showed areas for potential systematic improvement, and actions were created. Nearly all actions were implemented within one year, and environmental sustainability improved significantly. Most improvements cost no money to implement, and the few that did had to pass criteria in a business case. Results from a company-wide survey showed that the vast majority of employees felt that environmental issues were important, and that they were willing to help improve performance. Environmental awareness training was given to everyone in the department, and individuals were given measurable improvement targets. A focus group was set up and met regularly to agree improvements and monitor results. Environmental performance was publicised regularly to highlight successes and seek further engagement and improvement. Improvement ideas were encouraged and managed in a transparent way which showed clear prioritisation and accountability. The culture of environmental improvement changed visibly and results at the end of the first year showed that electricity consumption had reduced by 12.5%, and gas consumption had reduced by 7.3%. In less than two years over UK Pound 60,000 was saved

  14. Environmental Baseline File National Transportation

    International Nuclear Information System (INIS)

    Harris, M.

    1999-01-01

    This Environmental Baseline File summarizes and consolidates information related to the national-level transportation of commercial spent nuclear fuel. Topics addressed include: shipments of commercial spent nuclear fuel based on mostly truck and mostly rail shipping scenarios; transportation routing for commercial spent nuclear fuel sites and DOE sites; radionuclide inventories for various shipping container capacities; transportation routing; populations along transportation routes; urbanized area population densities; the impacts of historical, reasonably foreseeable, and general transportation; state-level food transfer factors; Federal Guidance Report No. 11 and 12 radionuclide dose conversion factors; and national average atmospheric conditions

  15. Environmental impact assessment of nuclear desalination plant at KANUPP

    International Nuclear Information System (INIS)

    Sleem, M.

    2010-01-01

    A Nuclear Desalination Demonstration Plant (NDDP) of 1600 m/sup 3//d capacity is being installed at Karachi Nuclear Power Plant (KANUPP). A Nuclear Desalination Plant (NDP) can impact the aquatic environment mainly by subjecting the aquatic life to possible temperature increase and salinity changes in the vicinity of the cooling water and brine discharges. Any wastewater effluent, which will be discharged from the NDDP, may have some adverse effects on the marine life and general environment. In order to protect the environment and comply with the requirement of the Pakistan Environmental Protection Agency (PEPA) an Environmental Impact Assessment (EIA) for the discharged effluent from NDDP was carried out. In the present work baseline study was carried out for project location, climate, water resources, and ecology. Checklist has been prepared for identification of possible environmental impacts of the project and marked as insignificant, small, moderate or major impact. Appropriate mitigation measures have been recommended that can be incorporated into the intended program to minimize environmental impacts identified during the assessment. Specific conclusions of the study and recommendations have also been provided in this paper.

  16. PUREX Plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    The PUREX aggregate area is made up of six operable units; 200-PO-1 through 200-PO-6 and consists of liquid and solid waste disposal sites in the vicinity of, and related to, PUREX Plant operations. This report describes PUREX and its waste sites, including cribs, french drains, septic tanks and drain fields, trenches and ditches, ponds, catch tanks, settling tanks, diversion boxes, underground tank farms, and the lines and encasements that connect them. Each waste site in the aggregate area is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. This document provides a technical baseline of the aggregate area and results from an environmental investigation. This document is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted

  17. Waste Isolation Pilot Plant site environmental report for calendar year 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site.

  18. Waste Isolation Pilot Plant site environmental report for calendar year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site

  19. Baseline report - tall upland shrubland at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    1997-03-01

    Rocky Flats Environmental Technology Site (Site) is located on the Colorado Piedmont east of the Front Range between Boulder and Golden. At an elevation of approximately 6,000 feet, the Site contains a unique ecotonal mixture of mountain and prairie plant species, resulting from the topography and close proximity to the mountain front. The Buffer Zone surrounding the Industrial Area is one of the largest remaining undeveloped areas of its kind along the Colorado Piedmont. A number of plant communities at the Site have been identified as increasingly rare and unique by Site ecologists and the Colorado Natural Heritage Program (CNHP). These include the xeric tallgrass prairie, tall upland shrubland, wetlands, and Great Plains riparian woodland communities. Many of these communities support populations of increasingly rare animals as well, including the Preble's meadow jumping mouse, grasshopper sparrow, loggerhead shrike, Merriam's shrew, black crowned night heron, and Hops blue and Argos skipper butterflies. One of the more interesting and important plant communities at the Site is the tall upland shrubland community. It has been generally overlooked by previous Site ecological studies, probably due to its relatively small size; only 34 acres total. Although mentioned in a plant community ordination study conducted by Clark et al. and also in the Site baseline ecological study, few data were available on this plant community before the present study

  20. Baseline report - tall upland shrubland at the Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Rocky Flats Environmental Technology Site (Site) is located on the Colorado Piedmont east of the Front Range between Boulder and Golden. At an elevation of approximately 6,000 feet, the Site contains a unique ecotonal mixture of mountain and prairie plant species, resulting from the topography and close proximity to the mountain front. The Buffer Zone surrounding the Industrial Area is one of the largest remaining undeveloped areas of its kind along the Colorado Piedmont. A number of plant communities at the Site have been identified as increasingly rare and unique by Site ecologists and the Colorado Natural Heritage Program (CNHP). These include the xeric tallgrass prairie, tall upland shrubland, wetlands, and Great Plains riparian woodland communities. Many of these communities support populations of increasingly rare animals as well, including the Preble`s meadow jumping mouse, grasshopper sparrow, loggerhead shrike, Merriam`s shrew, black crowned night heron, and Hops blue and Argos skipper butterflies. One of the more interesting and important plant communities at the Site is the tall upland shrubland community. It has been generally overlooked by previous Site ecological studies, probably due to its relatively small size; only 34 acres total. Although mentioned in a plant community ordination study conducted by Clark et al. and also in the Site baseline ecological study, few data were available on this plant community before the present study.

  1. Waste Isolation Pilot Plant site environmental report, for calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

  2. Waste Isolation Pilot Plant site environmental report, for calendar year 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site

  3. Breckinridge Project, initial effort. Report VII, Volume II. Environmental baseline report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Ashland Synthetic Fuels, Inc. (ASFI) and Airco Energy Company, Inc. (AECI) have recently formed the Breckinridge Project and are currently conducting a process and economic feasibility study of a commercial scale facility to produce synthetic liquid fuels from coal. The coal conversion process to be used is the H-COAL process, which is in the pilot plant testing stage under the auspices of the US Department of Energy at the H-COAL Pilot Plant Project near Catlettsburg, Kentucky. The preliminary plans for the commercial plant are for a 18,140 metric ton/day (24,000 ton/day) nominal coal assumption capacity utilizing the abundant high sulfur Western Kentucky coals. The Western Kentucky area offers a source of the coal along with adequate water, power, labor, transportation and other factors critical to the successful siting of a plant. Various studies by federal and state governments, as well as private industry, have reached similar conclusions regarding the suitability of such plant sites in western Kentucky. Of the many individual sites evaluated, a site in Breckinridge County, Kentucky, approximately 4 kilometers (2.5 miles) west of the town of Stephensport, has been identified as the plant location. Actions have been taken to obtain options to insure that this site will be available when needed. This report contains an overview of the regional setting and results of the baseline environmental studies. These studies include collection of data on ambient air and water quality, sound, aquatic and terrestrial biology and geology. This report contains the following chapters; introduction, review of significant findings, ambient air quality monitoring, sound, aquatic ecology, vegetation, wildlife, geology, soils, surface water, and ground water.

  4. Environmental Survey preliminary report, Pinellas Plant, Largo, Florida

    International Nuclear Information System (INIS)

    1987-11-01

    The purpose of this report is to present the preliminary findings made during the Environmental Survey, conducted May 11 through 22, 1987, at the United States Department of Energy (DOE) Pinellas Plant in Largo, Florida. As a Preliminary Report, the contents are subject to revisions, which will be made in a forthcoming Interim Report, based on Albuquerque Operations Office review and comments on technical accuracy, the results of the sampling and analyses, and other information that may come to the Survey team's attention prior to issuance of the Interim Report. The Pinellas Plant is currently operated for DOE by the General Electric Company-Neutron Devices Department (GENDD). The Pinellas Survey is part of the larger DOE-wide Environmental Survey effort announced by Secretary John S. Herrington on September 18, 1985. The purpose of this effort is to identify, via ''no fault'' baseline Surveys, existing environmental problems are areas of environmental risk at DOE facilities and to rank them on a DOE-wide basis. This ranking will enable DOE to more effectively establish priorities for addressing environmental problems and allocate the resources necessary to correct these problems. Because the Survey is ''no fault'' and is not an ''audit,'' it is not designed to identify specific isolated incidents of noncompliance or to analyze environmental management practices. Such incidents and/or management practices will, however, be used in the Survey as a means of identifying existing and potential environmental problems. 55 refs., 37 figs., 37 tabs

  5. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2008-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  6. Waste Isolation Pilot Plant annual site environmental report for calendar year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) defined a comprehensive set of parameters which are monitored to detect potential environmental impacts and establish baselines for future environmental evaluations. Surface water and groundwater, air, soil, and biotics are monitored for radioactivity levels. Nonradiological environmental monitoring activities include air, water quality, soil properties, meteorological measurements and determination of the status of the local biological community. Ecological studies focus on the immediate area surrounding the WIPP site with emphasis on the salt storage pile. The baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in its preoperational phase (i.e., no waste has been received) certain operational requirements of DOE Orders 5400.1, 5400.5, and the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T) are not relevant. Therefore, this report does not discuss items such as radionuclide emissions and effluents and subsequent doses to the public.

  7. Waste Isolation Pilot Plant annual site environmental report for calendar year 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) defined a comprehensive set of parameters which are monitored to detect potential environmental impacts and establish baselines for future environmental evaluations. Surface water and groundwater, air, soil, and biotics are monitored for radioactivity levels. Nonradiological environmental monitoring activities include air, water quality, soil properties, meteorological measurements and determination of the status of the local biological community. Ecological studies focus on the immediate area surrounding the WIPP site with emphasis on the salt storage pile. The baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in its preoperational phase (i.e., no waste has been received) certain operational requirements of DOE Orders 5400.1, 5400.5, and the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T) are not relevant. Therefore, this report does not discuss items such as radionuclide emissions and effluents and subsequent doses to the public

  8. Environmental Baseline File for National Transportation

    International Nuclear Information System (INIS)

    1999-01-01

    This Environmental Baseline File summarizes and consolidates information related to the national-level transportation of commercial spent nuclear fuel. Topics address include: shipments of commercial spent nuclear fuel based on mostly truck and mostly rail shipping scenarios; transportation routing for commercial spent nuclear fuel sites and DOE sites; radionuclide inventories for various shipping container capacities; transportation routing; populations along transportation routes; urbanized area population densities; the impacts of historical, reasonably foreseeable, and general transportation; state-level food transfer factors; Federal Guidance Report No. 11 and 12 radionuclide dose conversion factors; and national average atmospheric conditions

  9. Environmental baseline study of the Los Medanos Waste Isolation Pilot Plant (WIPP) project area of New Mexico: a progress report

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, H.G. (ed.)

    1977-09-01

    Exploratory drilling operations are being conducted for a Waste Isolation Pilot Program in southeastern New Mexico. Prior to the establishment of such a program, an environmental study was initiated to serve as a baseline for evaluation of the impact of future activities in the Los Medanos area. Much of this area has been influenced by human activities over a long period, and hence the baseline data only reflects the present, relatively disturbed condition of the environment. The study covers air resources, soils, and biotic resources. 23 tables, 6 figs. (DLC)

  10. Industrial Fuel Gas Demonstration-Plant Program. Volume II. The environment (Deliverable No. 27). [Baseline environmental data

    Energy Technology Data Exchange (ETDEWEB)

    1979-08-01

    The proposed site of the Industrial Fuel Gas Demonstration Plant (IFGDP) is located on a small peninsula extending eastward into Lake McKeller from the south shore. The peninsula is located west-southwest of the City of Memphis near the confluence of Lake McKeller and the Mississippi River. The environmental setting of this site and the region around this site is reported in terms of physical, biological, and human descriptions. Within the physical description, this report divides the environmental setting into sections on physiography, geology, hydrology, water quality, climatology, air quality, and ambient noise. The biological description is divided into sections on aquatic and terrestrial ecology. Finally, the human environment description is reported in sections on land use, demography, socioeconomics, culture, and visual features. This section concludes with a discussion of physical environmental constraints.

  11. Baseline environmental survey of proposed uranium mining projects of Domiasiat, Meghalaya

    International Nuclear Information System (INIS)

    Khathing, D.T.; Myrboh, B.; Nongkynrih, P.; War, S.A.; Marbaniang, D.G.; Iongwai, P.S.

    2005-01-01

    West Khasi Hills District of Meghalaya is identified as having a large and rich deposits of Uranium. However, actual extraction on a commercial scale that may lead to an increase in the socio-economic development of the state in particular and the country in general, is yet to be undertaken. This is due to lack of any baseline environmental survey giving rise to speculative information and causing a fear psychosis in the minds of the locals populace about the negative effects of Uranium mining. A preoperational survey and environmental monitoring of the proposed mining sites and its adjacent areas would establish the baseline status of the natural radioactivity and some chemical constituents in different environmental matrices via. air, water, soil, biota and aquatic ecosystems. The North Eastern Hill University, Shillong, Meghalaya has undertaken the Project funded by DST and BRNS, Department of Atomic Energy, Govt. of India which aims to provide baseline environmental data on ambient air, water and soil quality in and around the proposed Uranium mining site of Domiasiat, West Khasi Hills in the state of Meghalaya. Trace elements (elements like Mg, Zn, Ca, K, Na, Se, As, Fe, Cu, Co, Cr, Ni, Pb, Cd, Mn etc) and the status of the activity in the samples are determined. (author)

  12. Environmental Survey preliminary report, Pinellas Plant, Largo, Florida

    Energy Technology Data Exchange (ETDEWEB)

    1987-11-01

    The purpose of this report is to present the preliminary findings made during the Environmental Survey, conducted May 11 through 22, 1987, at the United States Department of Energy (DOE) Pinellas Plant in Largo, Florida. As a Preliminary Report, the contents are subject to revisions, which will be made in a forthcoming Interim Report, based on Albuquerque Operations Office review and comments on technical accuracy, the results of the sampling and analyses, and other information that may come to the Survey team's attention prior to issuance of the Interim Report. The Pinellas Plant is currently operated for DOE by the General Electric Company-Neutron Devices Department (GENDD). The Pinellas Survey is part of the larger DOE-wide Environmental Survey effort announced by Secretary John S. Herrington on September 18, 1985. The purpose of this effort is to identify, via no fault'' baseline Surveys, existing environmental problems are areas of environmental risk at DOE facilities and to rank them on a DOE-wide basis. This ranking will enable DOE to more effectively establish priorities for addressing environmental problems and allocate the resources necessary to correct these problems. Because the Survey is no fault'' and is not an audit,'' it is not designed to identify specific isolated incidents of noncompliance or to analyze environmental management practices. Such incidents and/or management practices will, however, be used in the Survey as a means of identifying existing and potential environmental problems. 55 refs., 37 figs., 37 tabs.

  13. Environmental baselines: preparing for shale gas in the UK

    Science.gov (United States)

    Bloomfield, John; Manamsa, Katya; Bell, Rachel; Darling, George; Dochartaigh, Brighid O.; Stuart, Marianne; Ward, Rob

    2014-05-01

    Groundwater is a vital source of freshwater in the UK. It provides almost 30% of public water supply on average, but locally, for example in south-east England, it is constitutes nearly 90% of public supply. In addition to public supply, groundwater has a number of other uses including agriculture, industry, and food and drink production. It is also vital for maintaining river flows especially during dry periods and so is essential for maintaining ecosystem health. Recently, there have been concerns expressed about the potential impacts of shale gas development on groundwater. The UK has abundant shales and clays which are currently the focus of considerable interest and there is active research into their characterisation, resource evaluation and exploitation risks. The British Geological Survey (BGS) is undertaking research to provide information to address some of the environmental concerns related to the potential impacts of shale gas development on groundwater resources and quality. The aim of much of this initial work is to establish environmental baselines, such as a baseline survey of methane occurrence in groundwater (National methane baseline study) and the spatial relationships between potential sources and groundwater receptors (iHydrogeology project), prior to any shale gas exploration and development. The poster describes these two baseline studies and presents preliminary findings. BGS are currently undertaking a national survey of baseline methane concentrations in groundwater across the UK. This work will enable any potential future changes in methane in groundwater associated with shale gas development to be assessed. Measurements of methane in potable water from the Cretaceous, Jurassic and Triassic carbonate and sandstone aquifers are variable and reveal methane concentrations of up to 500 micrograms per litre, but the mean value is relatively low at documented in the range 2km. The geological modelling process will be presented and discussed

  14. ecotaxonomic baseline evaluation of the plant species in a ...

    African Journals Online (AJOL)

    Admin

    plant species of medicinal and other economic values. The investigation was ... A total of 41 and 24 representative ... INTRODUCTION. Baseline .... at 100m interval, involving a total of 15 sampling locations .... explained by factors such as climate, productivity and ... encouraging the: Maintenance of traditional tree species.

  15. The optimized baseline project: Reinventing environmental restoration at Hanford

    International Nuclear Information System (INIS)

    Goodenough, J.D.; Janaskie, M.T.; Kleinen, P.J.

    1994-01-01

    The U.S. Department of Energy Richland Operations Office (DOE-RL) is using a strategic planning effort (termed the Optimized Baseline Project) to develop a new approach to the Hanford Environmental Restoration program. This effort seeks to achieve a quantum leap improvement in performance through results oriented prioritization of activities. This effort was conducted in parallel with the renegotiation of the Tri-Party Agreement and provided DOE with an opportunity to propose innovative initiatives to promote cost effectiveness, accelerate progress in the Hanford Environmental Restoration Program and involve stakeholders in the decision-making process. The Optimized Baseline project is an innovative approach to program planning and decision-making in several respects. First, the process is a top down, value driven effort that responds to values held by DOE, the regulatory community and the public. Second, planning is conducted in a way that reinforces the technical management process at Richland, involves the regulatory community in substantive decisions, and includes the public. Third, the Optimized Baseline Project is being conducted as part of a sitewide Hanford initiative to reinvent Government. The planning process used for the Optimized Baseline Project has many potential applications at other sites and in other programs where there is a need to build consensus among diverse, independent groups of stakeholders and decisionmakers. The project has successfully developed and demonstrated an innovative approach to program planning that accelerates the pace of cleanup, involves the regulators as partners with DOE in priority setting, and builds public understanding and support for the program through meaningful opportunities for involvement

  16. Methodology for conducting baseline environmental studies, applied to the environments of two nuclear sites; Metodologia para la realizacion de estudios de estado basico ambiental, aplicada a los entornos de dos emplazamientos nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez Baco, L.; Yague Alvarez, F.

    2012-07-01

    The methodology described can understand and document the characteristics of form geo referenced environmental baseline condition of the surroundings of nuclear power plants, covering the needs in this regard made by the legislation of environmental responsibility.

  17. Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989

    International Nuclear Information System (INIS)

    1989-01-01

    This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs

  18. Estimating the Cold War mortgage: The 1995 baseline environmental management report. Volume 1

    International Nuclear Information System (INIS)

    1995-03-01

    This is the first annual report on the activities and potentials costs required to address the waste, contamination, and surplus nuclear facilities that are the responsibility of the Department of Energy's Environmental Management program. The Department's Office of Environmental Management, established in 1989, manages one of the largest environmental programs in the world--with more than 130 sites and facilities in over 30 States and territories. The primary focus of the program is to reduce health and safety risks from radioactive waste and contamination resulting from the production, development, and testing of nuclear weapons. The program also is responsible for the environmental legacy from, and ongoing waste management for, nuclear energy research and development, and basic science research. In an attempt to better oversee this effort, Congress required the Secretary of Energy to submit a Baseline Environmental Management Report with annual updates. The 1995 Baseline Environmental Management Report provides life-cycle cost estimates, tentative schedules, and projected activities necessary to complete the Environmental Management program

  19. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  20. Waste Isolation Pilot Plant: Site environmental report for calendar year 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) monitors a comprehensive set of parameters in order to detect any potential environmental Impacts and establish baselines for future quantitative environmental Impact evaluations. Surface water and groundwater, air, soil, and biotics are measured for background radiation. Nonradiological environmental monitoring activities include air quality, water quality, soil properties, meteorological, and the status of the local biological community. Ecological studies focus on the immediate area surrounding the site with emphasis on the salt storage pile, whereas baseline radiological surveillance covers a broader geographic area Including nearby ranches, villages, and cities. Since the WIPP is still in a preoperational state, and no waste has been received; certain elements required by DOE Order 5400.1 are not presented In this report. The most significant addition to the 1991 report is the inclusion of the first four appendices, the Radiological Baseline Program (DOE/WIPP 92-037), the Salt Impact Studies (DOE/WIPP 92-038), the Disturbed Land Reclamation Techniques (DOE/WIPP 92-039), and the Background Water Characterization for the WIPP (DOE/WIPP 92-013). These appendices are independently published and available to interested parties by the DOE reference number. These summaries will not be published in future ASER'S. They will, however, be referenced as a basis for evaluating similar data collected during the Test and subsequent Operational phases of the WIPP

  1. Using the baseline environmental management report (BEMR) to examine alternate program scenarios

    International Nuclear Information System (INIS)

    Kristofferson, K.

    1995-01-01

    The US Department of Energy's (DOE) Office of Environmental Management (EM) released the first Baseline Environmental Management Report (BEMR) in March, 1995. The Congressionally-mandated report provides life-cycle cost estimates, tentative schedules, and projected activities necessary to complete DOE's Environmental Management Program. This ''base case'' estimate is based on current program assumptions and the most likely set of activities. However, since the future course of the Environmental Management Program depends upon a number of fundamental technical and policy choices, alternate program scenarios were developed. These alternate cases show the potential cost impacts of changing assumptions in four key areas: future land use, program funding and scheduling, technology development, and waste management configurations. Several cost and program evaluation tools were developed to support the analysis of these alternate cases. The objective of this paper is to describe the analytical tool kit developed to support the development of the 1995 Baseline Report and to discuss the application of these tools to evaluate alternate program scenarios

  2. Sandia National Laboratories, California proposed CREATE facility environmental baseline survey.

    Energy Technology Data Exchange (ETDEWEB)

    Catechis, Christopher Spyros

    2013-10-01

    Sandia National Laboratories, Environmental Programs completed an environmental baseline survey (EBS) of 12.6 acres located at Sandia National Laboratories/California (SNL/CA) in support of the proposed Collaboration in Research and Engineering for Advanced Technology and Education (CREATE) Facility. The survey area is comprised of several parcels of land within SNL/CA, County of Alameda, California. The survey area is located within T 3S, R 2E, Section 13. The purpose of this EBS is to document the nature, magnitude, and extent of any environmental contamination of the property; identify potential environmental contamination liabilities associated with the property; develop sufficient information to assess the health and safety risks; and ensure adequate protection for human health and the environment related to a specific property.

  3. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2004-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  4. Framework for ensuring appropriate maintenance of baseline PSA and risk monitor models in a nuclear power plant

    International Nuclear Information System (INIS)

    Vrbanic, I.; Sorman, J.

    2005-01-01

    The necessity of observing both long term and short term risk changes many times imposes the need for a nuclear power plant to have a baseline PSA model to produce an estimate of long term averaged risk and a risk monitor to produce a time-dependent risk curve and/or safety functions status at points in time or over a shorter time period of interest. By nature, a baseline PSA reflects plant systems and operation in terms of average conditions and provides time-invariant quantitative risk metrics. Risk monitor, on the other hand, requires condition-specific modeling to produce a quantitative and/or qualitative estimate of plant's condition-specific risk metrics. While risk monitor is used for computing condition-specific risk metrics over time, a baseline PSA model is needed for variety of other risk oriented applications, such as assessments of proposed design modifications or risk ranking of equipment. Having in mind their importance and roles, it is essential that both models, i.e. baseline PSA model and risk monitor are maintained in the way that they represent, as accurately as practically achievable, the actual plant status (e.g. systems' design and plant's procedures in effect) and its history (e.g. numbers of equipment failures and demands that influence relevant PSA parameters). Paper discusses the requirements for appropriate maintenance of plant's baseline PSA model and risk monitor model and presents the framework for plant's engineering and administrative procedures that would ensure they are met. (author)

  5. Green Plants in the Red: A Baseline Global Assessment for the IUCN Sampled Red List Index for Plants.

    Directory of Open Access Journals (Sweden)

    Neil A Brummitt

    Full Text Available Plants provide fundamental support systems for life on Earth and are the basis for all terrestrial ecosystems; a decline in plant diversity will be detrimental to all other groups of organisms including humans. Decline in plant diversity has been hard to quantify, due to the huge numbers of known and yet to be discovered species and the lack of an adequate baseline assessment of extinction risk against which to track changes. The biodiversity of many remote parts of the world remains poorly known, and the rate of new assessments of extinction risk for individual plant species approximates the rate at which new plant species are described. Thus the question 'How threatened are plants?' is still very difficult to answer accurately. While completing assessments for each species of plant remains a distant prospect, by assessing a randomly selected sample of species the Sampled Red List Index for Plants gives, for the first time, an accurate view of how threatened plants are across the world. It represents the first key phase of ongoing efforts to monitor the status of the world's plants. More than 20% of plant species assessed are threatened with extinction, and the habitat with the most threatened species is overwhelmingly tropical rain forest, where the greatest threat to plants is anthropogenic habitat conversion, for arable and livestock agriculture, and harvesting of natural resources. Gymnosperms (e.g. conifers and cycads are the most threatened group, while a third of plant species included in this study have yet to receive an assessment or are so poorly known that we cannot yet ascertain whether they are threatened or not. This study provides a baseline assessment from which trends in the status of plant biodiversity can be measured and periodically reassessed.

  6. Environmental efficiency among corn ethanol plants

    International Nuclear Information System (INIS)

    Sesmero, Juan P.; Perrin, Richard K.; Fulginiti, Lilyan E.

    2012-01-01

    Economic viability of the US corn ethanol industry depends on prices, technical and economic efficiency of plants and the extent of policy support. Public policy support is tied to the environmental efficiency of plants measured as their impact on emissions of greenhouse gases. This study evaluates the environmental efficiency of seven recently constructed ethanol plants in the North Central region of the US, using nonparametric data envelopment analysis (DEA). The minimum feasible level of GHG emissions per unit of ethanol is calculated for each plant and this level is decomposed into its technical and allocative sources. Results show that, on average, plants in our sample may be able to reduce GHG emissions by a maximum of 6% or by 2.94 Gg per quarter. Input and output allocations that maximize returns over operating costs (ROOC) are also found based on observed prices. The environmentally efficient allocation, the ROOC-maximizing allocation, and the observed allocation for each plant are combined to calculate economic (shadow) cost of reducing greenhouse gas emissions. These shadow costs gauge the extent to which there is a trade off or a complementarity between environmental and economic targets. Results reveal that, at current activity levels, plants may have room for simultaneous improvement of environmental efficiency and economic profitability. -- Highlights: ► Environmental efficiency of ethanol plants in the North Central US is evaluated. ► Economic (shadow) cost of reducing greenhouse gas emissions is calculated. ► Feasible changes in the mix of inputs and byproducts can reduce GHG emissions. ► On average plants may be able to reduce GHG emissions by 2.94 Gg per quarter. ► GHG reductions may be achieved at a moderate or zero operating cost.

  7. An assessment of baseline ecological risks at the Fernald Environmental Management Project, Fernald, Ohio

    International Nuclear Information System (INIS)

    Duke, C.S.; Meyers-Schone, L.; Glum, S.R.; Quaider, W.

    1991-01-01

    The Fernald Environmental Management Project (FEMP), formerly the Feed Materials Production Center (FMPC), is a Department of Energy (DOE) facility located near Cincinnati, Ohio, which produced pure uranium metals from the early 1950s until 1989. DOE is currently conducting a Remedial Investigation/Feasibility Study (RI/FS) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), in order to remediate environmental impacts at the site. DOE is also preparing an environmental impact statement under the National Environmental Policy Act (NEPA) to evaluate environmental impacts of proposed remedial actions. Both CERCLA and NEPA require evaluation of ecological risks of baseline conditions and proposed remedial actions. A preliminary assessment of ecological risks examined the potential effects of FEMP contaminants in one operable unit (OU) at the site, OU5, Environmental Media. Radionuclides of potential concern in OU5 soils include uranium, cesium, radium, strontium, technetium, and thorium. Chemicals detected in terrestrial organisms include aluminum, arsenic, barium, cadmium, lead, mercury, vanadium, and zinc, as well as radionuclides. Chemicals of potential concern in surface water include a variety of metals as well as uranium and technetium. Radionuclides in OU5 do not appear to pose a hazard to terrestrial organisms. Estimated radiation doses to aquatic organisms continually exposed to the maximum uranium concentrations observed in on-property drainages ranged from 40 to 4000 rad per year. However, off-property radionuclide concentrations are very low, and it is unlikely that organisms in streams adjacent to the FEMP are exposed to toxic levels. Maximum arsenic levels in vegetation collected from the FEMP are consistent with values reported in the literature to be toxic to certain plants. However, signs of stress have not been observed in vegetation on or adjacent to the FEMP

  8. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-20

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D&D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities.

  9. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D ampersand D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities

  10. 40 CFR 74.20 - Data for baseline and alternative baseline.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Data for baseline and alternative baseline. 74.20 Section 74.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... baseline and alternative baseline. (a) Acceptable data. (1) The designated representative of a combustion...

  11. Rocky Flats Plant Site Environmental Report for 1992

    Energy Technology Data Exchange (ETDEWEB)

    Cirrincione, D.A.; Erdmann, N.L. [eds.

    1992-12-31

    The Rocky Rats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1992. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population.

  12. Integrating environmental control for coal plant efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Shepard, M

    1986-01-01

    As emission control requirements for power plants have grown more stringent, utilities have added new environmental protection technology. As environmental controls have been added one after another, plant designers have rarely had the opportunity to integrate these components with each other and the balance of the plant. Consequently they often cost more to build and operate and can reduce power plant efficiency and availability. With the aim of lowering the cost of environmental systems, a design approach known as integrated environmental control (IEC) has emerged. This is based on the premise that environmental controls can function most economically if they are designed integrally with other power generation equipment. EPRI has established an IEC progam to develop integrated design strategies and evaluate their net worth to utilities. Various aspects of this program are described. (3 refs.)

  13. Comprehensive baseline environmental audit of former underground test areas in Colorado, Nevada, and New Mexico

    International Nuclear Information System (INIS)

    1994-05-01

    This report documents the results of the Comprehensive Baseline Environmental Audit of Former Underground Test Areas (FUTAS) in the States of Colorado, Nevada, and New Mexico. DOE and contractor systems for management of environmental protection activities on the Nevada Test Site (NTS) were not within the scope of the audit. The audit was conducted May 16-May 26, 1994, by the Office of Environmental Audit (EH-24). DOE 5482.1 B, open-quotes Environment, Safety, and Health Appraisal Programclose quotes, establishes the mission of EH-24, which is to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is to enhance environmental protection and minimize risk to public health and the environment. EH-24 accomplishes its mission using systematic and periodic evaluations of DOE's environmental programs within line organizations and supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. These evaluations function as a vehicle through which the Secretary and program managers are apprised of the status and vulnerabilities of Departmental environmental activities and environmental management systems. Several types of evaluations are conducted, including: (1) comprehensive baseline environmental audits; (2) routine environmental audits; (3) environmental management assessments; and (4) special issue reviews

  14. Evaluation of Haddam Neck (Connecticut Yankee) Nuclear Power Plant, environmental impact prediction, based on monitoring programs

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Mahaffey, J.A.; Waton, D.G.

    1976-12-01

    A study was undertaken by the U.S. Nuclear Regulatory Commission (NRC) to evaluate the nonradiological environmental data obtained from three nuclear power plants operating for a period of one year or longer. The document presented reports the second of three nuclear power plants to be evaluated in detail by Battelle, Pacific Northwest Laboratories. Haddam Neck (Connecticut Yankee) Nuclear Power Plant nonradiological monitoring data were assessed to determine their effectiveness in the measurement of environmental impacts. Efforts were made to determine if: (1) monitoring programs, as designed, can detect environmental impacts, (2) appropriate statistical analyses were performed and if they were sensitive enough to detect impacts, (3) predicted impacts could be verified by monitoring programs, and (4) monitoring programs satisfied the requirements of the Environmental Technical Specifications. Both preoperational and operational monitoring data were examined to test the usefulness of baseline information in evaluating impacts. This included an examination of the methods used to measure ecological, chemical, and physical parameters, and an assessment of sampling periodicity and sensitivity where appropriate data sets were available. From this type of analysis, deficiencies in both preoperational and operational monitoring programs may be identified and provide a basis for suggested improvement

  15. Environmental protection in thermal power plants

    International Nuclear Information System (INIS)

    1987-01-01

    This workbook is a compilation of the most important facts and data that are relevant today for environmental protection in thermal power plants. Unlike the other issues the text is not in the form of a random collection of data but in the form of a complete presentation. Possible elaboration projects for pupils can be easily derived from the individual sections. These deal with: the discussion about environmental protection; forest decline; sources of emission; nuisances in the Federal Republic of Germany; environmental protection in fossil-fuel power plants - clean air - cooling water utilization and water protection - noise; environmental protection in nuclear power plants - radioactive material produced in nuclear reactors and the retention of such materials - radioactive waste materials - monitoring of radioactive emissions; accessory materials and hints. (orig./HSCH) [de

  16. Plant-phytopathogen interactions: bacterial responses to environmental and plant stimuli.

    Science.gov (United States)

    Leonard, Simon; Hommais, Florence; Nasser, William; Reverchon, Sylvie

    2017-05-01

    Plant pathogenic bacteria attack numerous agricultural crops, causing devastating effects on plant productivity and yield. They survive in diverse environments, both in plants, as pathogens, and also outside their hosts as saprophytes. Hence, they are confronted with numerous changing environmental parameters. During infection, plant pathogens have to deal with stressful conditions, such as acidic, oxidative and osmotic stresses; anaerobiosis; plant defenses; and contact with antimicrobial compounds. These adverse conditions can reduce bacterial survival and compromise disease initiation and propagation. Successful bacterial plant pathogens must detect potential hosts and also coordinate their possibly conflicting programs for survival and virulence. Consequently, these bacteria have a strong and finely tuned capacity for sensing and responding to environmental and plant stimuli. This review summarizes our current knowledge of the signals and genetic circuits that affect survival and virulence factor expression in three important and well-studied plant pathogenic bacteria with wide host ranges and the capacity for long-term environmental survival. These are: Ralstonia solanacerarum, a vascular pathogen that causes wilt disease; Agrobacterium tumefaciens, a biotrophic tumorigenic pathogen responsible for crown gall disease and Dickeya, a brute force apoplastic pathogen responsible for soft-rot disease. © 2016 Society for Applied Microbiology and John Wiley & Sons Ltd.

  17. Environmental Baseline Survey for Installation of Five New Hydrogeologic Groundwater Monitoring Wells

    Energy Technology Data Exchange (ETDEWEB)

    Catechis, Christopher S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    This Phase I Environmental Baseline Survey (EBS) provides the findings of a survey and assessment for termination of an existing easement granted to the Department of Energy (DOE) for the installation of 5 new hydrogeologic groundwater monitoring wells located on KAFB, New Mexico. The purpose of this EBS is to: Document the nature, magnitude, and extent of any environmental contamination of the property. Identify potential environmental contamination liabilities associated with the property. Develop sufficient information to assess the health and safety risks. Ensure adequate protection for human health and the environment related to a specific property. Determine possible effects of contamination on property valuation, and serve as the basis for notice of environmental condition for applicable federal or local real property disclosure requirements.

  18. Environmental survey preliminary report, Mound Plant, Miamisburg, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Mound Plant, conducted August 18 through 29, 1986. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Mound Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Mound Plant, and interviews with site personnel. The Survey found no environmental problems at the Mound Plant that represent an immediate threat to human life. The environmental problems identified at the Mound Plant by the Survey confirm that the site is confronted with a number of environmental problems which are by and large a legacy from past practices at a time when environmental problems were less well understood. Theses problems vary in terms of their magnitude and risk, as described in this report. Although the sampling and analysis performed by the Mound Plant Survey will assist in further identifying environmental problems at the site, a complete understanding of the significance of some of the environmental problems identified requires a level of study and characterization that is beyond the scope of the Survey. Actions currently under way or planned at the site, particularly the Phase II activities of the Comprehensive Environmental Analysis and Response Program (CEARP) as developed and implemented by the Albuquerque Operations Office, will contribute toward meeting this requirement. 85 refs., 24 figs., 20 tabs.

  19. Rocky Flats Plant Site Environmental Report: 1993 Highlights

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    The Rocky Flats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1993. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population. This section provides an overview of these topics and summarizes more comprehensive discussions found in the main text of this annual report.

  20. Evidence of the shifting baseline syndrome in ethnobotanical research.

    Science.gov (United States)

    Hanazaki, Natalia; Herbst, Dannieli Firme; Marques, Mel Simionato; Vandebroek, Ina

    2013-11-14

    The shifting baseline syndrome is a concept from ecology that can be analyzed in the context of ethnobotanical research. Evidence of shifting baseline syndrome can be found in studies dealing with intracultural variation of knowledge, when knowledge from different generations is compared and combined with information about changes in the environment and/or natural resources. We reviewed 84 studies published between 1993 and 2012 that made comparisons of ethnobotanical knowledge according to different age classes. After analyzing these studies for evidence of the shifting baseline syndrome (lower knowledge levels in younger generations and mention of declining abundance of local natural resources), we searched within these studies for the use of the expressions "cultural erosion", "loss of knowledge", or "acculturation". The studies focused on different groups of plants (e.g. medicinal plants, foods, plants used for general purposes, or the uses of specific important species). More than half of all 84 studies (57%) mentioned a concern towards cultural erosion or knowledge loss; 54% of the studies showed evidence of the shifting baseline syndrome; and 37% of the studies did not provide any evidence of shifting baselines (intergenerational knowledge differences but no information available about the abundance of natural resources). The general perception of knowledge loss among young people when comparing ethnobotanical repertoires among different age groups should be analyzed with caution. Changes in the landscape or in the abundance of plant resources may be associated with changes in ethnobotanical repertoires held by people of different age groups. Also, the relationship between the availability of resources and current plant use practices rely on a complexity of factors. Fluctuations in these variables can cause changes in the reference (baseline) of different generations and consequently be responsible for differences in intergenerational knowledge. Unraveling

  1. Environmental impact assessment of coal power plants in operation

    Directory of Open Access Journals (Sweden)

    Bartan Ayfer

    2017-01-01

    Full Text Available Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS. The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  2. Environmental impact assessment of coal power plants in operation

    Science.gov (United States)

    Bartan, Ayfer; Kucukali, Serhat; Ar, Irfan

    2017-11-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS). The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  3. [Environmental geochemical baseline of heavy metals in soils of the Ili river basin and pollution evaluation].

    Science.gov (United States)

    Zhao, Xin-Ru; Nasier, Telajin; Cheng, Yong-Yi; Zhan, Jiang-Yu; Yang, Jian-Hong

    2014-06-01

    Environmental geochemical baseline models of Cu, Zn, Pb, As, Hg were established by standardized method in the ehernozem, chestnut soil, sierozem and saline soil from the Ili river valley region. The theoretical baseline values were calculated. Baseline factor pollution index evaluation method, environmental background value evaluation method and heavy metal cleanliness evaluation method were used to compare soil pollution degrees. The baseline factor pollution index evaluation showed that As pollution was the most prominent among the four typical types of soils within the river basin, with 7.14%, 9.76%, 7.50% of sampling points in chernozem, chestnut soil and sierozem reached the heavy pollution, respectively. 7.32% of sampling points of chestnut soil reached the permitted heavy metal Pb pollution index in the chestnut soil. The variation extent of As and Pb was the largest, indicating large human disturbance. Environmental background value evaluation showed that As was the main pollution element, followed by Cu, Zn and Pb. Heavy metal cleanliness evaluation showed that Cu, Zn and Pb were better than cleanliness level 2 and Hg was the of cleanliness level 1 in all four types of soils. As showed moderate pollution in sierozem, and it was of cleanliness level 2 or better in chernozem, chestnut soil and saline-alkali soil. Comparing the three evaluation systems, the baseline factor pollution index evaluation more comprehensively reflected the geochemical migration characteristics of elements and the soil formation processes, and the pollution assessment could be specific to the sampling points. The environmental background value evaluation neglected the natural migration of heavy metals and the deposition process in the soil since it was established on the regional background values. The main purpose of the heavy metal cleanliness evaluation was to evaluate the safety degree of soil environment.

  4. Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Boring, Ronald L.; Joe, Jeffrey C.

    2015-02-01

    For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

  5. Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

    International Nuclear Information System (INIS)

    Boring, Ronald L.; Joe, Jeffrey C.

    2015-01-01

    For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative–intended to catalog final products–rather than formative–intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

  6. Rocky Flats Plant Site Environmental Report for 1992

    International Nuclear Information System (INIS)

    Cirrincione, D.A.; Erdmann, N.L.

    1992-01-01

    The Rocky Rats Plant Site Environmental Report provides summary information on the plant's environmental monitoring programs and the results recorded during 1992. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population

  7. Environmental assessment, Pinellas Plant site, Petersburg, Florida

    International Nuclear Information System (INIS)

    1983-07-01

    The purpose of this environmental assessment is to describe the operations at the Pinellas Plant, discuss the locale in which the plant is situated and assess the actual and possible impacts of plant operation on the surrounding environment. The facility and the local environment are described; impacts on the economy, local community and the environment discussed, and alternatives presented. A comparison of the environmental impact of operating the Pinellas Plant versus the benefits gained by its operation suggests that the plant should continue its function of supplying nuclear weapons components for the US Department of Energy

  8. Environmental certification for small hydropower plants

    International Nuclear Information System (INIS)

    Truffer, B.; Meier, W.; Vollenweider, S.; Seiler, B.; Dettli, R.

    2001-01-01

    This report for the Swiss Federal Institute for Environmental Science and Technology describes product-differentiation options for small hydropower plant in Switzerland and proposes a form of differentiation based on ecological characteristics as a promising market strategy. The labels created in various countries to assure customers of the environmental compatibility of 'green' power production are looked at. In particular, the implications for small hydropower plant associated with the Swiss green power labelling procedure introduced by the Association for the Promotion of Environmentally Sound Electricity (VUE) are discussed. The report proposes a simplified procedure for these small power stations and presents a sample calculation for the overall costs of certification. The report is rounded off with four detailed case studies in which the necessary upgrades to the plant and associated costs are discussed in detail

  9. Do invasive alien plants benefit more from global environmental change than native plants?

    Science.gov (United States)

    Liu, Yanjie; Oduor, Ayub M O; Zhang, Zhen; Manea, Anthony; Tooth, Ifeanna M; Leishman, Michelle R; Xu, Xingliang; van Kleunen, Mark

    2017-08-01

    Invasive alien plant species threaten native biodiversity, disrupt ecosystem functions and can cause large economic damage. Plant invasions have been predicted to further increase under ongoing global environmental change. Numerous case studies have compared the performance of invasive and native plant species in response to global environmental change components (i.e. changes in mean levels of precipitation, temperature, atmospheric CO 2 concentration or nitrogen deposition). Individually, these studies usually involve low numbers of species and therefore the results cannot be generalized. Therefore, we performed a phylogenetically controlled meta-analysis to assess whether there is a general pattern of differences in invasive and native plant performance under each component of global environmental change. We compiled a database of studies that reported performance measures for 74 invasive alien plant species and 117 native plant species in response to one of the above-mentioned global environmental change components. We found that elevated temperature and CO 2 enrichment increased the performance of invasive alien plants more strongly than was the case for native plants. Invasive alien plants tended to also have a slightly stronger positive response to increased N deposition and increased precipitation than native plants, but these differences were not significant (N deposition: P = 0.051; increased precipitation: P = 0.679). Invasive alien plants tended to have a slightly stronger negative response to decreased precipitation than native plants, although this difference was also not significant (P = 0.060). So while drought could potentially reduce plant invasion, increases in the four other components of global environmental change considered, particularly global warming and atmospheric CO 2 enrichment, may further increase the spread of invasive plants in the future. © 2017 John Wiley & Sons Ltd.

  10. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  11. Shifting environmental baselines in the Red Sea.

    Science.gov (United States)

    Price, A R G; Ghazi, S J; Tkaczynski, P J; Venkatachalam, A J; Santillan, A; Pancho, T; Metcalfe, R; Saunders, J

    2014-01-15

    The Red Sea is among the world's top marine biodiversity hotspots. We re-examined coastal ecosystems at sites surveyed during the 1980s using the same methodology. Coral cover increased significantly towards the north, mirroring the reverse pattern for mangroves and other sedimentary ecosystems. Latitudinal patterns are broadly consistent across both surveys and with results from independent studies. Coral cover showed greatest change, declining significantly from a median score of 4 (1000-9999 m(2)) to 2 (10-99m(2)) per quadrat in 2010/11. This may partly reflect impact from coastal construction, which was evident at 40% of sites and has significantly increased in magnitude over 30 years. Beach oil has significantly declined, but shore debris has increased significantly. Although substantial, levels are lower than at some remote ocean atolls. While earlier reports have suggested that the Red Sea is generally healthy, shifting environmental baselines are evident from the current study. Copyright © 2013 Elsevier Ltd. All rights reserved.

  12. Evaluation of Monticello Nuclear Power Plant, Environmental Impact Prediction, based on monitoring programs

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Watson, D.G.

    1976-11-01

    This report evaluates quantitatively the nonradiological environmental monitoring programs at Monticello Nuclear Generating Plant. The general objective of the study is to assess the effectiveness of monitoring programs in the measurement of environmental impacts. Specific objectives include the following: (1) Assess the validity of environmental impact predictions made in the Environmental Statement by analysis of nonradiological monitoring data; (2) evaluate the general adequacy of environmental monitoring programs for detecting impacts and their responsiveness to Technical Specifications objectives; (3) assess the adequacy of preoperational monitoring programs in providing a sufficient data base for evaluating operational impacts; (4) identify possible impacts that were not predicted in the environmental statement and identify monitoring activities that need to be added, modified or deleted; and (5) assist in identifying environmental impacts, monitoring methods, and measurement problems that need additional research before quantitative predictions can be attempted. Preoperational as well as operational monitoring data were examined to test the usefulness of baseline information in evaluating impacts. This included an examination of the analytical methods used to measure ecological and physical parameters, and an assessment of sampling periodicity and sensitivity where appropriate data were available

  13. Angra nuclear plant - environmental control program

    International Nuclear Information System (INIS)

    Kircher, E.; Cruz, E.S. da

    1989-01-01

    The pre-operational studies, that were elaborated before the beginning of Angra I Power Plant operation, are described in particular the environmental radiological safety area till the fuel loading in the core reactor. Several aspects are included, as socio-economic survey, seismological analysis, Meteorological Program, marine biology, water cooling system, exposure measures of natural radiation, marine sediments characterization in the effluent dispersion area and Environmental Radiological Monitoring Program. The main environmental programs developed for the operational phase of the Angra I Plant are also presented, citing some considerations about the Meteorological Program, Marine Biology Control Program, Temperature and Chlorine Control in Piraquara de Fora Bay, Radiological Environmental Monitoring Program, Sanitary Effluent Control Program and Radiological Emergency Program. (C.G.C.). 2 refs

  14. Pinellas Plant annual site environmental report for calendar year 1995

    International Nuclear Information System (INIS)

    1996-05-01

    Lockheed Martin Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high-quality Environmental, Safety and Health Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholders the results of the Pinellas Plant's environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the Environmental Monitoring, Waste Management, and Environmental Restoration Programs at the Pinellas Plant for 1995. This report also includes the plant's performance in the areas of compliance with applicable regulatory requirements and standards and identifies major Environmental, Safety and Health Program initiatives and accomplishments for 1995. As a result of the end of the Department of Energy's Defense Programs mission (weapons production) on September 30, 1994, considerable changes at the Pinellas Plant are occurring. The Department of Energy's Environmental Management is now the landlord of the Pinellas Plant to facilitate the plant's new mission of transition to alternate use in support of economic development and safe shutdown. The Department of Energy sold the Pinellas Plant to the Pinellas County Industry Council in March 1995, and it is leasing back a portion of the plant through September 1997, to complete the safe shutdown and transition activities

  15. Strategies for baseline/environmental impact studies in Nigeria

    International Nuclear Information System (INIS)

    Odu, C.T.

    1991-01-01

    This paper reports that in order to assess the environmental impact of site activities and ecosystem change brought about by stress, basic baseline data are necessary to characterize the normal environment so that environmental quality control programs can be developed with a firm ecological base. The program and methodology adopted in our field surveys to assess the character, magnitude and extent of pollutant effects on soil, vegetation and water, as a basis for economic assessment of pollutant effects on agriculture, forestry and the aquatic system and for preparing environmental impact statements, are presented. These techniques were modified and adopted in the environmental impact study of the Isampou Manifold Oil Spill, a study which circumstances made necessary seven years after the oil spill. Reliance on the extent of pollution soon after the incidence was based on the determination of total hydrocarbons at creek bottoms as well as on the determinations of nickel/vanadium ratios. Hydrocarbon contents of creek banks and creek bottoms were within biogenic levels at the time of field sampling. Ni/V ratios were high in heavy impact areas and decreased in areas of medium and very light impact areas. Use of the Ni/V ratio as evidence of past oil pollution agreed closely with a sketch of the extent of crude oil pollution drawn by the Shell Petroleum Development Company seven years earlier. There were nor abnormal vegetation features. The presence of 10-15 years old Musanga cecropioides at the edge of the manifold slot and creeks indicated that vegetation above water level was not affected by the oil spillage. The physico-chemical properties of the waters, plankton composition and density of the species found, as well as the presence of endroproct bryozoan in the benthos showed that the aquatic system had by the time of sample collection, completely recovered from the oil spillage

  16. Environmental baseline study of the Los Medanos Waste Isolation Pilot Plant (WIPP) project area of New Mexico: a progress report. An addendum

    International Nuclear Information System (INIS)

    Wolfe, H.G.

    1977-09-01

    Sandia Laboratories, Albuquerque, New Mexico, has been conducting exploratory drilling operations for a Waste Isolation Pilot Program Eddy and Lea counties in southeast New Mexico for almost two years. Prior to the establishment of such a program, an environmental study has been carried out as a baseline for evaluation of the impact of future activities in the Los Medanos area. Data are presented on the geology; topography; climate; vegetation; and population density, diet, and seasonal movements of mammals, lizards, snakes, birds, insects, and ground-dwelling arthropods of the study area

  17. A sampling strategy to establish existing plant configuration baselines

    International Nuclear Information System (INIS)

    Buchanan, L.P.

    1995-01-01

    The Department of Energy's Gaseous Diffusion Plants (DOEGDP) are undergoing a Safety Analysis Update Program. As part of this program, critical existing structures are being reevaluated for Natural Phenomena Hazards (NPH) based on the recommendations of UCRL-15910. The Department of Energy has specified that current plant configurations be used in the performance of these reevaluations. This paper presents the process and results of a walkdown program implemented at DOEGDP to establish the current configuration baseline for these existing critical structures for use in subsequent NPH evaluations. These structures are classified as moderate hazard facilities and were constructed in the early 1950's. The process involved a statistical sampling strategy to determine the validity of critical design information as represented on the original design drawings such as member sizes, orientation, connection details and anchorage. A floor load inventory of the dead load of the equipment, both permanently attached and spare, was also performed as well as a walkthrough inspection of the overall structure to identify any other significant anomalies

  18. Pinellas Plant annual site environmental report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Martin Marietta Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high quality Environmental Management Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholder the results of their environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the environmental monitoring, waste management, and environmental restoration programs at the Pinellas Plant for 1993. This report also includes the plant's performance in the areas of compliance with applicable regulatory requirements and standards and identifies major environmental management program initiatives and accomplishments for 1993

  19. Rocky Flats Plant Site Environmental Report: 1993 Highlights

    International Nuclear Information System (INIS)

    1993-01-01

    The Rocky Flats Plant Site Environmental Report provides summary information on the plant's environmental monitoring programs and the results recorded during 1993. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population. This section provides an overview of these topics and summarizes more comprehensive discussions found in the main text of this annual report

  20. Environmental standard review plans for the environmental review of construction permit applications for nuclear power plants

    International Nuclear Information System (INIS)

    1979-05-01

    Information is presented concerning environmental descriptions; plant description; environmental impacts of construction; environmental impacts of station operation; environmental measurements and monitoring programs; environmental impacts of postulated accidents involving radioactive materials; the need for the plant; alternatives to the project; and evaluation of the proposed action

  1. Preliminary environmental assessment of selected geopressured - geothermal prospect areas: Louisiana Gulf Coast Region. Volume II. Environmental baseline data

    Energy Technology Data Exchange (ETDEWEB)

    Newchurch, E.J.; Bachman, A.L.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Newman, J.P. Jr.; Smith, C.G. Jr.; Bailey, J.I. Jr.; Kelly, G.G.; Reibert, K.C.

    1978-10-15

    A separate section is presented for each of the six prospect areas studied. Each section includes a compilation and discussion of environmental baseline data derived from existing sources. The data are arranged as follows: geology and geohydrology, air quality, water resources and flood hazards, ecological systems, and land use. When data specific to the prospect were not available, regional data are reported. (MHR)

  2. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility. Volume 2, Revision 2

    International Nuclear Information System (INIS)

    Weekes, D.C.; Lindsey, K.A.; Ford, B.H.; Jaeger, G.K.

    1996-12-01

    This document is Volume 2 in a two-volume series that comprise the site characterization report, the Preoperational Baseline and Site Characterization Report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; preoperational baseline chemical data and aquifer test data. Five groundwater monitoring wells, six deep characterization boreholes, and two shallow characterization boreholes were drilled at the Environmental Restoration Disposal Facility (ERDF) site to directly investigate site-specific hydrogeologic conditions

  3. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  4. Portsmouth Gaseous Diffusion Plant environmental report for 1989

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. (ed.) (Martin Marietta Energy Systems, Inc., Oak Ridge, TN (USA))

    1990-10-01

    This calendar year 1989 annual report on environmental surveillance of the US Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS) and its environs consists of two parts: the Summary, Discussion, and Conclusions (Part 1) and the Data Presentation (Part 2). The objectives of this report are the following: report 1989 monitoring data for the installation and its environs that may have been affected by operations on the plant site, provide reasonably detailed information about the plant site and plant operations, provide detailed information on input and assumptions used in all calculations, provide trend analyses (where appropriate) to indicate increases and decreases in environmental impact, and provide general information on plant quality assurance. Routine monitoring and sampling for radiation, radioactive materials, and chemical substances on and off the DOE site are used to document compliance with appropriate standards, to identify trends, to provide information for the public, and to contribute to general environmental knowledge. The surveillance program assists in fulfilling the DOE policy of protecting the public, employees, and environment from harm that could be caused by its activities and reducing negative environmental impacts to the greatest degree practicable. Environmental-monitoring information complements data on specific releases, trends, and summaries. 26 refs.

  5. Environmental effects of large discharges of cooling water. Experiences from Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Ehlin, Ulf; Lindahl, Sture; Neuman, Erik; Sandstroem, Olof; Svensson, Jonny

    2009-07-01

    Monitoring the environmental effects of cooling water intake and discharge from Swedish nuclear power stations started at the beginning of the 1960s and continues to this day. In parallel with long-term monitoring, research has provided new knowledge and methods to optimise possible discharge locations and design, and given the ability to forecast their environmental effects. Investigations into the environmental effects of cooling-water are a prerequisite for the issuing of power station operating permits by the environmental authorities. Research projects have been carried out by scientists at universities, while the Swedish Environmental Protection Agency, the Swedish Board of Fisheries, and the Swedish Meteorological and Hydrological Institute, SMHI, are responsible for the greater part of the investigations as well as of the research work. The four nuclear power plants dealt with in this report are Oskarshamn, Ringhals, Barsebaeck and Forsmark. They were taken into operation in 1972, 1975, 1975 and 1980 resp. - a total of 12 reactors. After the closure of the Barsebaeck plants in 2005, ten reactors remain in service. The maximum cooling water discharge from the respective stations was 115, 165, 50 and 135 m 3 /s, which is comparable to the mean flow of an average Swedish river - c:a 150 m 3 /s. The report summarizes studies into the consequences of cooling water intake and discharge. Radiological investigations made at the plants are not covered by this review. The strategy for the investigations was elaborated already at the beginning of the 1960s. The investigations were divided into pre-studies, baseline investigations and monitoring of effects. Pre-studies were partly to gather information for the technical planning and design of cooling water intake and outlet constructions, and partly to survey the hydrographic and ecological situation in the area. Baseline investigations were to carefully map the hydrography and ecology in the area and their natural

  6. Cogeneration plant noise: Environmental impacts and abatement

    International Nuclear Information System (INIS)

    De Renzio, M.; Ciocca, B.

    1991-01-01

    In Italy, ever increasing attention to environmental problems has led to legislation requiring cogeneration plant owners to perform environmental impact assessments in order to determine plant conformity with pollution laws. This paper, based on an in-depth analysis of physics fundamentals relevant to the nature and effects of noise, examines the principal sources of noise in industrial cogeneration plants and the intensity and range of the effects of this noise on the local environment. A review is then made of the different methods of noise pollution abatement (e.g., heat and corrosion resistant silencers for gas turbines, varying types and thicknesses of acoustic insulation placed in specific locations) that can be effectively applied to cogeneration plant equipment and housing

  7. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This document Volume 2 in a two-volume series that comprise the site characterization report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; and preoperational baseline chemical data and aquifer test data. This does not represent the entire body of data available. Other types of information are archived at BHI Document Control. Five ground water monitoring wells were drilled at the Environmental Restoration Disposal Facility site to directly investigate site- specific hydrogeologic conditions. Well and borehole activity summaries are presented in Volume 1. Field borehole logs and geophysical data from the drilling are presented in this document. Well development and pump installation sheets are presented for the groundwater monitoring wells. Other data presented in this document include borehole geophysical logs from existing wells; chemical data from the sampling of soil, vegetation, and mammals from the ERDF to support the preoperational baseline; ERDF surface radiation surveys;a nd aquifer testing data for well 699-32-72B

  8. Environmental management systems implemented in the Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Redondo, R.; Fernandez Guisado, M. B.; Hortiguela, R.; Bustamante, L. F.; Esparza, J. L.; Villareal, M.; Yague, F.

    2013-01-01

    The companies that own the Spanish Nuclear Power Plants, aware of social concern and in the context of a growing demanding environmental legislation, have a permanent commitment to the electricity production based on the principles of a maximum respect for the environment, safety, quality, professionalism and continuous improvement. In order to minimize the environmental impact of their plants they have implemented and Environmental Management System based on the ISO 14001 Standard. They minimize the environmental impact by identifying the significant environmental aspects and defining the corresponding objectives. This article describes the referred environmental management systems and their environmental objectives, as applied and defined by the Spanish Nuclear Power Plants. (Author)

  9. TRANSGENIC PLANTS: ENVIRONMENTAL PERSISTENCE AND EFFECTS ON SOIL AND PLANT ECOSYSTEMS

    Science.gov (United States)

    The genetic engineering of plants has facilitated the production of valuable agricultural and forestry crops. Transgenic plants have been created that have increased resistance to pests, herbicides, pathogens, and environmental stress, enhanced qualitative and quantitative trait...

  10. Rapidly shifting environmental baselines among fishers of the Gulf of California

    Science.gov (United States)

    Sáenz-Arroyo, Andrea; Roberts, Callum M; Torre, Jorge; Cariño-Olvera, Micheline; Enríquez-Andrade, Roberto R

    2005-01-01

    Shifting environmental baselines are inter-generational changes in perception of the state of the environment. As one generation replaces another, people's perceptions of what is natural change even to the extent that they no longer believe historical anecdotes of past abundance or size of species. Although widely accepted, this phenomenon has yet to be quantitatively tested. Here we survey three generations of fishers from Mexico's Gulf of California (N=108), where fish populations have declined steeply over the last 60 years, to investigate how far and fast their environmental baselines are shifting. Compared to young fishers, old fishers named five times as many species and four times as many fishing sites as once being abundant/productive but now depleted (Kruskal–Wallis tests, both p<0.001) with no evidence of a slowdown in rates of loss experienced by younger compared to older generations (Kruskal–Wallis test, n.s. in both cases). Old fishers caught up to 25 times as many Gulf grouper Mycteroperca jordani as young fishers on their best ever fishing day (regression r2=0.62, p<0.001). Despite times of plentiful large fish still being within living memory, few young fishers appreciated that large species had ever been common or nearshore sites productive. Such rapid shifts in perception of what is natural help explain why society is tolerant of the creeping loss of biodiversity. They imply a large educational hurdle in efforts to reset expectations and targets for conservation. PMID:16191603

  11. TWRS phase I privatization site environmental baseline and characterization plan

    International Nuclear Information System (INIS)

    Shade, J.W.

    1997-01-01

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan

  12. Environmental impact assessment of coal power plants in operation

    OpenAIRE

    Bartan Ayfer; Kucukali Serhat; Ar Irfan

    2017-01-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly as...

  13. Determining baselines and variability of elements in plants and soils near the Kenai National Wildlife Refuge, Alaska

    Science.gov (United States)

    Crock, J.G.; Severson, R.C.; Gough, L.P.

    1992-01-01

    Recent investigations on the Kenai Peninsula had two major objectives: (1) to establish elemental baseline concentrations ranges for native vegetation and soils; and, (2) to determine the sampling density required for preparing stable regional geochemical maps for various elements in native plants and soils. These objectives were accomplished using an unbalanced, nested analysis-of-variance (ANOVA) barbell sampling design. Hylocomium splendens (Hedw.) BSG (feather moss, whole plant), Picea glauca (Moench) Voss (white spruce, twigs and needles), and soil horizons (02 and C) were collected and analyzed for major and trace total element concentrations. Using geometric means and geometric deviations, expected baseline ranges for elements were calculated. Results of the ANOVA show that intensive soil or plant sampling is needed to reliably map the geochemistry of the area, due to large local variability. For example, producing reliable element maps of feather moss using a 50 km cell (at 95% probability) would require sampling densities of from 4 samples per cell for Al, Co, Fe, La, Li, and V, to more than 15 samples per cell for Cu, Pb, Se, and Zn.Recent investigations on the Kenai Peninsula had two major objectives: (1) to establish elemental baseline concentrations ranges for native vegetation and soils; and, (2) to determine the sampling density required for preparing stable regional geochemical maps for various elements in native plants and soils. These objectives were accomplished using an unbalanced, nested analysis-of-variance (ANOVA) barbell sampling design. Hylocomium splendens (Hedw.) BSG (feather moss, whole plant), Picea glauca (Moench) Voss (white spruce, twigs and needles), and soil horizons (02 and C) were collected and analyzed for major and trace total element concentrations. Using geometric means and geometric deviations, expected baseline ranges for elements were calculated. Results of the ANOVA show that intensive soil or plant sampling is needed to

  14. Exergetic and environmental analysis of a pulverized coal power plant

    International Nuclear Information System (INIS)

    Restrepo, Álvaro; Miyake, Raphael; Kleveston, Fábio; Bazzo, Edson

    2012-01-01

    This paper presents the results of exergetic and environmental analysis of a typical pulverized coal power plant located in Brazil. The goal was to quantify both the exergy destruction and the environmental impact associated with a thermal power plant. The problem boundary consists of the entire coal delivery route, including mining and beneficiation, transport, pre-burning processes and the power plant. The used data were obtained mainly from field measurements taken in all system processes, from mining to the power plant. The study focused only on the operation period. Previous works have shown that the construction and decommissioning periods contribute less than 1% of the environmental impact. The exergetic analysis was based on the second law of thermodynamics while the environmental analysis was based on life cycle assessment (LCA) using SimaPro 7.2, focussing on the climate change and acidification impact categories. The CO 2 -eq emission was 1300 kg per MWh. The highest degree of environmental impact occurred during the combustion process. The exergetic and environmental analysis provides a tool to evaluate irreversibilities and the environmental impact, identifying the most significant stages and equipment of the entire power generation process. -- Highlights: ► Exergetic and environmental analysis of a typical Brazilian PC power plant. ► Environmental impact associated with the mining, transport and thermal power plant. ► Life cycle assessment used for environmental analysis. ► Acidification impact category evaluated using Eco-indicator 99. ► Climate change impact evaluation using (Global Warming Potential) GWP 100a.

  15. Portsmouth Gaseous Diffusion Plant environmental report for 1992

    International Nuclear Information System (INIS)

    Horak, C.M.

    1993-09-01

    This calendar year (CY) 1992 annual report on environmental surveillance of the US Department of Energy's (DOE's) Portsmouth Gaseous Diffusion Plant (PORTS) and its environs consists of two parts: narrative, summaries, and conclusions (Part 1) and data presentation (Part 2). The objectives of this report are to: (1) report 1992 monitoring data for the installation and its environs that may have been affected by operations on the plant site, (2) provide reasonably detailed information about the plant site and plant operations, (3) provide detailed information on input and assumptions used in all calculations, (4) provide trend analyses (where appropriate) to indicate increases and decreases in environmental impact, and (5) provide general information on plant quality assurance

  16. Portsmouth Gaseous Diffusion Plant Environmental report for 1990

    Energy Technology Data Exchange (ETDEWEB)

    Counce-Brown, D. (ed.)

    1991-09-01

    This calendar year 1990 annual report on environmental surveillance of the US Department of Energy's (DOE's) Portsmouth Gaseous Diffusion Plant (PORTS) and its environs consists of two parts: the summary, discussion, and conclusions (Part 1) and the data presentation (Part 2). The objectives of this report are as follows: report 1990 monitoring data for the installation and its environs that may have been affected by operations on the plant site, provide reasonably detailed information about the plant site and plant operations, provide detailed information on input and assumptions used in all calculations, provide trend analyses (when appropriate) to indicate increases and decreases in environmental impact, and provide general information on plant quality assurance.

  17. Paducah Gaseous Diffusion Plant environmental report for 1992

    Energy Technology Data Exchange (ETDEWEB)

    Horak, C.M. [ed.] [Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States)

    1993-09-01

    This two-part report, Paducah Gaseous Diffusion Plant Environmental Report for 1992, is published annually. It reflects the results of an environmental monitoring program designed to quantify potential increases in the concentration of contaminants and potential doses to the resident human population. The Paducah Gaseous Diffusion Plant (PGDP) overall goal for environmental management is to protect the environment and PGDP`s neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, reduce the generation of waste, and minimize hazardous waste by substitution of materials.

  18. Paducah Gaseous Diffusion Plant environmental report for 1992

    International Nuclear Information System (INIS)

    Horak, C.M.

    1993-09-01

    This two-part report, Paducah Gaseous Diffusion Plant Environmental Report for 1992, is published annually. It reflects the results of an environmental monitoring program designed to quantify potential increases in the concentration of contaminants and potential doses to the resident human population. The Paducah Gaseous Diffusion Plant (PGDP) overall goal for environmental management is to protect the environment and PGDP's neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, reduce the generation of waste, and minimize hazardous waste by substitution of materials

  19. Comprehensive Baseline Environmental Audit of the Inhalation Toxicology Research Institute, Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    1993-06-01

    This report documents the results of the Comprehensive Baseline Environmental Audit conducted at the Inhalation Toxicology Research Institute (ITRI) in Albuquerque, New Mexico. The scope of the audit at the ITRI was comprehensive, addressing environmental activities in the technical areas of air; soils, sediments, and biota; surface water/drinking water; groundwater; waste management; toxic and chemical materials; quality assurance; radiation; inactive waste sites; environmental management; and environmental monitoring programs. Specifically assessed was the compliance of ITRI operations and activities with Federal, state, and local regulations; DOE Orders; internal operating standards; and best management practices. Onsite activities included inspection of ITRI facilities and operations; review of site documents; interviews with DOE and contractor personnel, as well as representatives from state regulatory agencies; and reviews of previous appraisals. Using these sources of information, the environmental audit team developed findings, which fell into two general categories: compliance findings and best management practice findings. Each finding also identifies apparent causal factor(s) that contributed to the finding and will assist line management in developing ''root causes'' for implementing corrective actions

  20. Waste Isolation Pilot Plant 2001 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse TRU Solutions, Inc.

    2002-09-20

    The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment.

  1. Waste Isolation Pilot Plant 2001 Site Environmental Report

    International Nuclear Information System (INIS)

    Westinghouse TRU Solutions, Inc.

    2002-01-01

    The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment

  2. Waste Isolation Pilot Plant 1999 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, Roy B.; Adams, Amy; Martin, Don; Morris, Randall C.; Reynolds, Timothy D.; Warren, Ronald W.

    2000-09-30

    The U.S. Department of Energy's (DOE)Carlsbad Area Office and the Westinghouse Waste Isolation Division (WID) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 1999 Site Environmental Report summarizes environmental data from calendar year 1999 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during calendar year 1999. WIPP received its first shipment of waste on March 26, 1999. In 1999, no evidence was found of any adverse effects from WIPP on the surrounding environment. Radionuclide concentrations in the environment surrounding WIPP were not statistically higher in 1999 than in 1998.

  3. Estimation of environmental external costs between coal fired power plant and nuclear power plant

    International Nuclear Information System (INIS)

    Moon, G. H.; Kim, S. S.

    2000-01-01

    First of all, this study evaluated the impacts on the health and the environment of air pollutants emitted from coal power plant and nuclear power pant, two major electric power generating options in Korea. Then, the environmental external costs of those two options were estimated by transforming the health and environment impact into monetary values. To do this, AIRPACTS and Impacts of Atmospheric Release model developed by IAEA were used. The environmental external cost of Samcheonpo coal power plant was estimated about 25 times as much as that of Younggwang nuclear power plant. This result implies that nuclear power plant is a clean technology compared with coal power plant. This study suggests that the external cost should be reflected in the electric system expansion plan in order to allocate energy resources efficiently and to reduce economic impact stemming from the environmental regulation emerged recently on a global level

  4. Annual site environmental monitoring report for the Waste Isolation Pilot Plant, Calendar year 1985

    International Nuclear Information System (INIS)

    Reith, C.; Prince, K.; Fischer, T.; Rodriguez, A.; Uhland, D.; Winstanley, D.

    1986-04-01

    This is the first Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP project is operated by the US Department of Energy (DOE) for the purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes generated by the defense activities of the U.S. Government. The report provides a comprehensive description of environmental activities at WIPP during Calendar Year 1985, including: a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of environmental program information, including an update on the status of environmental permits and compliance activities; a presentation of the findings of the Radiological Baseline Program (RBP), which is a program to characterize radionuclide activities in the environment around the WIPP site; and a summary of findings of the Ecological Monitoring Program (EMP), which examines non-radiological impacts of WIPP construction on the surrounding ecosystem. The WIPP facility is under construction, and will not receive radioactive wastes before October 1988. Therefore, this report describes the status of preoperational (as opposed to operational) environmental activities. 29 refs., 17 figs., 22 tabs

  5. Pinellas Plant environmental monitoring report 1986

    International Nuclear Information System (INIS)

    1987-04-01

    The effluent and environmental monitoring programs maintained by the Pinellas Plant are designed to determine the efficiencies of treatment and control mechanisms for environmental releases; to provide measurements of discharge concentrations for comparison with applicable standards; and to assess the concentrations of these discharges in the on-site and off-site environment

  6. The Y-12 Plant - a model for environmental excellence

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    The Department of Energy`s Y-12 Plant, located in Oak Ridge, Tennessee, occupies more than 800 acres and has a work force of over 4,000 employees. The Y-12 Plant is managed by Martin Marietta Energy Systems, Inc., a subsidiary of Martin Marietta Corporation. Although mission emphases at the Y-12 Plant have evolved and changed with the easing of international tensions, the Plant continues to serve as a key manufacturing unit and technology demonstration center for the Department of Energy and the nation. The Y-12 Plant has undergone many changes in the last 14 years. One of the most dramatic changes has occurred in the environmental programs with measurable improvements in environmental quality, the development of an award-winning pollution prevention program, and the institution of an environmentally-conscious work ethic among the work force. Because the plant is committed to achieving excellence, not just compliance with laws and regulations, a highly structured, multimedia environmental management program is in place. This program, combined with a commitment to protect the environment while striving for continued improvement, has placed Y-12 in the position to reach excellence. As a result of the Y-12 Plant`s changing mission, they are now working closely with American industry through technology transfer to share their experiences and {open_quotes}lessons learned{close_quotes}--including environmental and pollution prevention technology. To facilitate this effort, the Oak Ridge Centers for Manufacturing Technology has been established at the Y-12 Plant. Through the Centers, the Oak Ridge staff applies skills, capabilities, and facilities developed over a 50-year history of the Oak Ridge Complex to a variety of peacetime missions. The services found at the Centers are a key to helping America`s businesses--both small and large--compete in the global marketplace while protecting the nations environment and conserving its resources.

  7. Environmental pollution and plant responses

    Energy Technology Data Exchange (ETDEWEB)

    Agrawal, S.B.; Agrawal, M. [Banaras Hindu Univ. (India)

    1999-11-01

    This is a comprehensive book that presents and analyses the most current research on the causal factors contributing to the deteriorating environmental quality and its effect on plant performance. It presents a holistic approach to environmental problem throughout the world; covers recent trends in understanding mechanism of action individually and in combination with other factors; evaluates recent trends of information on global climatic change issues and its consequences; and gives management strategies to be followed for abating the problem.

  8. Environmental Survey preliminary report, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1987-11-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the Department of Energy (DOE), Y-12 Plant, conducted November 10 through 21 and December 9 through 11, 1986. This Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Y-12 Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Y-12, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the Y-12 Plant Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Y-12 Plant Survey. 80 refs., 76 figs., 61 tabs

  9. Environmental Survey preliminary report, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1987-11-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the Department of Energy (DOE), Y-12 Plant, conducted November 10 through 21 and December 9 through 11, 1986. This Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Y-12 Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Y-12, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the Y-12 Plant Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Y-12 Plant Survey. 80 refs., 76 figs., 61 tabs.

  10. Environmental survey around EDF nuclear power plants

    International Nuclear Information System (INIS)

    Foulquier, L.

    1992-01-01

    Description of various types of environmental test carried out under the responsibility of the Operator of nuclear power plants in France, with taking Fessenheim nuclear power plant as an example: permanent monitoring of radioactivity, periodic radioecological assessments, main results of measurements taken, showing that there are no detectable effects of the plant on the environment, policy of openness by publication of these results

  11. Preparation of environmental reports and impact statements for nuclear power plants

    International Nuclear Information System (INIS)

    Tsai, Y.H.

    1986-01-01

    Considerable first-hand experience has accumulated during the past decade in the United States regarding the preparation of environmental reports (ER) and environmental impact statements (EIS) for nuclear power plants. The US Nuclear Regulatory Commission (USNRC), which is responsible for regulating the construction and operation of nuclear power plants, is required under the National Environmental Policy Act to prepare an EIS for each plant. To obtain information essential to the EIS, the USNRC requires that each power company submit an ER. This paper focuses on the interrelationships of the two environmental documents and discusses the environmental review process and the environmental laws and regulations related to the licensing of nuclear power plants. It also describes the format and content, environmental issues, data requirements, and impact assessment methodologies for preparation of the ER and EIS. Problems associated with preparing the EIS are presented, with particular emphasis on the problems and methodologies associated with evaluating environmental costs and benefits

  12. Environmental Assessment/Baseline Survey to Establish New Drop Zone (DZ) in Cadiz, Ohio

    Science.gov (United States)

    2009-03-01

    International Airport LATN Low Altitude Tactical Navigation MACA Military Airspace Collision Avoidance µg/m3 microgram per cubic meter MSL mean...Environmental Assessment and Baseline Survey 3-3 To Establish New Drop Zone in Cadiz, OH The 911 AW has a Military Airspace Collision Avoidance ( MACA ) plan...in Cadiz, OH The 911 AW flight safety would revise their existing MACA plan to include activities at the new drop zone. The MACA includes placing a

  13. Environmental certification for small hydropower plants; Umweltzertifizierung Kleinwasserkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Truffer, B.; Meier, W.; Vollenweider, S. [Eidgenoessische Anstalt fuer Wasserversorgung, Abwasserreinigung und Gewaesserschutz (EAWAG), Kastanienbaum (Switzerland); Seiler, B.; Dettli, R. [Econcept AG, Zuerich (Switzerland)

    2001-07-01

    This report for the Swiss Federal Institute for Environmental Science and Technology describes product-differentiation options for small hydropower plant in Switzerland and proposes a form of differentiation based on ecological characteristics as a promising market strategy. The labels created in various countries to assure customers of the environmental compatibility of 'green' power production are looked at. In particular, the implications for small hydropower plant associated with the Swiss green power labelling procedure introduced by the Association for the Promotion of Environmentally Sound Electricity (VUE) are discussed. The report proposes a simplified procedure for these small power stations and presents a sample calculation for the overall costs of certification. The report is rounded off with four detailed case studies in which the necessary upgrades to the plant and associated costs are discussed in detail.

  14. Pinellas Plant environmental monitoring report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    The effluent and environmental monitoring programs maintained by the Pinellas Plant are designed to determine the efficiencies of treatment and control mechanisms for environmental releases; to provide measurements of discharge concentrations for comparison with applicable standards; and to assess the concentrations of these discharges in the on-site and off-site environment. This report was prepared in accordance with the reporting requirements of USDOE Draft Order 5484.1A, ''Environmental Protection, Safety, and Health Protection Information Reporting Requirements.'' All radiological and chemical effluents were found in compliance

  15. How Will Global Environmental Changes Affect the Growth of Alien Plants?

    Directory of Open Access Journals (Sweden)

    Jujie Jia

    2016-11-01

    Full Text Available Global environmental changes can create novel habitats, promoting the growth of alien plants that often exhibit broad environmental tolerance and high phenotypic plasticity. However, the mechanisms underlying these growth promotory effects are unknown at present. Here, we conducted a phylogenetically controlled meta-analysis using data from 111 published studies encompassing the responses of 129 alien plants to global warming, increased precipitation, N deposition, and CO2 enrichment. We compared the differences in the responses of alien plants to the four global environmental change factors across six categories of functional traits between woody and non-woody life forms as well as C3 and C4 photosynthetic pathways. Our results showed that all four global change factors promote alien plant growth. Warming had a more positive effect on C4 than C3 plants. Although the effects of the four factors on the functional traits of alien plants were variable, plant growth was mainly promoted via an increase in growth rate and size. Our data suggest that potential future global environmental changes could further facilitate alien plant growth.

  16. Portsmouth Gaseous Diffusion Plant annual site environmental report for 1993

    Energy Technology Data Exchange (ETDEWEB)

    Horak, C.M. [ed.

    1994-11-01

    This calendar year (CY) 1993 annual report on environmental monitoring of the US Department of Energy`s (DOE`s) Portsmouth Gaseous Diffusion Plant (Portsmouth) and its environs consists of three separate documents: a summary pamphlet for the general public; a more detail discussion and of compliance status, data, and environmental impacts (this document); and a volume of detailed data that is available on request. The objectives of this report are to report compliance status during 1993; provide information about the plant site and plant operations; report 1993 monitoring data for the installation and its environs that may have been affected by operations on the plant site; document information on input and assumptions used in calculations; provide trend analyses (where appropriate) to indicate increases and decreases in environmental impact, and provide general information on quality assurance for the environmental monitoring program.

  17. Portsmouth Gaseous Diffusion Plant annual site environmental report for 1993

    International Nuclear Information System (INIS)

    Horak, C.M.

    1994-11-01

    This calendar year (CY) 1993 annual report on environmental monitoring of the US Department of Energy's (DOE's) Portsmouth Gaseous Diffusion Plant (Portsmouth) and its environs consists of three separate documents: a summary pamphlet for the general public; a more detail discussion and of compliance status, data, and environmental impacts (this document); and a volume of detailed data that is available on request. The objectives of this report are to report compliance status during 1993; provide information about the plant site and plant operations; report 1993 monitoring data for the installation and its environs that may have been affected by operations on the plant site; document information on input and assumptions used in calculations; provide trend analyses (where appropriate) to indicate increases and decreases in environmental impact, and provide general information on quality assurance for the environmental monitoring program

  18. Environmental impacts of nuclear and coal-fired power plants

    International Nuclear Information System (INIS)

    Horyna, J.; Horynova, H.

    1984-01-01

    The current situation in the development of nuclear power in the world and in Czechoslovakia is briefly outlined and the possibilities are discussed of alternative energy resources. The environmental impact is described of conventional power plants firing coal; sulphur and nitrogen oxides are mentioned and their environmental impacts shown. Their quantities and the quantities of other gaseous, liquid and soid wastes produced by coal power plants are given. Annual estimates are presented of radioactive material emissions; trace amount emissions of toxic metals and their ecological risks are shown. Concern over the increasing concentration of CO 2 in the atmosphere is voiced. For nuclear power plants, the amount of radionuclides in stack emission and of those released into water flows is tabulated. Their effect on the aqueous ecosystem is characterized as is thermal pollution of water flows and the environmental impact of cooling towers. Other factors are also mentioned, such as the increased industrial land use, the effect of high voltage transmission lines and aesthetic effects. The conclusion is arrived at that the construction of nuclear power plants will eliminate the adverse environmental impact of emissions while the other impacts of the two types of power plants are comparable. (A.K.)

  19. Of Fish and Fishermen: Shifting Societal Baselines to Reduce Environmental Harm in Fisheries

    Directory of Open Access Journals (Sweden)

    Mimi E. Lam

    2012-12-01

    Full Text Available If reasonable fishery harvests and environmental harms are specified in new regulations, policies, and laws governing the exploitation of fish for food and livelihoods, then societal baselines can shift to achieve sustainable fisheries and marine conservation. Fisheries regulations can limit the environmental and social costs or harms caused by fishing by requiring the fishing industry to pay for the privilege to fish, via access fees for the opportunity to catch fish and extraction fees for fish caught; both fees can be combined with a progressive environmental tax to discourage overcapitalization and overfishing. Fisheries policies can be sustainable if predicated on an instrumental and ethical harm principle to reduce fishing harm. To protect the public trust in fisheries, environmental laws can identify the unsustainable depletion of fishery resources as ecological damage and a public nuisance to bind private fishing enterprises to a harm principle. Collaborative governance can foster sustainable fisheries if decision-making rights and responsibilities of marine stewardship are shared among government, the fishing industry, and civil society. As global food security and human welfare are threatened by accelerating human population growth and environmental impacts, decisions of how to use and protect the environment will involve collective choices in which all citizens have a stake - and a right.

  20. Environmental monitoring at the Savannah River Plant. Annual report, 1984

    International Nuclear Information System (INIS)

    Zeigler, C.C.; Lawrimore, I.B.; O'Rear, W.E.

    1985-06-01

    Ensuring the radiation safety of the public in the vicinity of the Savannah River Plant was a foremost consideration in the design of the plant and has continued to be a primary objective during 31 years of SRP operations. An extensive surveillance program has been continuously maintained since 1951 (before SRP startup) to determine the concentrations of radionuclides in the environment of the plant. The results of this comprehensive monitoring program are reported annually in two publications. The first, ''Savannah River Plant Environmental Report for 1984'' [DPSPU85-30-1], contains radiation dose data, routine radiological and nonradiological environmental surveillance activities, summaries of environmental protection programs that are in progress, summaries of sitewide environmental research and management programs, and a summary of National Environmental Policy Act (NEPA) activities. This report is the second and contains primarily radiation dose data and radiological and nonradiological monitoring data both onsite and offsite. It is placed in Department of Energy (DOE) reading rooms and is available to the public upon request. A listing of corresponding reports that have been issued since before plant startup is presented in Appendix A. The scope of the environmental monitoring program at SRP has increased significantly during the years since plant startup. The change is reflected in annual reports. Prior to the mid-1970's the reports contained primarily radiological monitoring data. Beginning in the mid-1970's the reports started including more and more nonradiological monitoring data as those programs increased. The nonradiological monitoring program now approaches the size and extensiveness of the radiological monitoring program

  1. Waste Isolation Pilot Plant CY 2000 Site Environmental Report

    International Nuclear Information System (INIS)

    Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

    2001-01-01

    The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no evidence was found of any adverse

  2. Waste Isolation Pilot Plant CY 2000 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

    2001-12-31

    The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no

  3. Paducah Gaseous Diffusion Plant Environmental report for 1990

    Energy Technology Data Exchange (ETDEWEB)

    Counce-Brown, D. (ed.)

    1991-09-01

    This two-part report, Paducah Gaseous Diffusion Plant Site Environmental Report for 1990, is published annually. It reflects the results of a comprehensive, year-round program to monitor the impact of operations at Paducah Gaseous Diffusion Plant (PGDP) on the area's groundwater and surface waters, soil, air quality, vegetation, and wildlife. In addition, an assessment of the effect of PGDP effluents on the resident human population is made. PGDP's overall goal for environmental management is to protect the environment and PGDP's neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, to reduce the formation of waste, and to minimize hazardous waste by substitution of materials.

  4. Pinellas Plant Annual Site Environmental Report for calendar year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    This report presents a comprehensive summary of the results of the Environmental Monitoring, Waste Management, and Environmental Restoration Programs at the Pinellas Plant, in Pinellas County, Florida for 1994. This report also includes the plant's performance in the areas of compliance with applicable regulatory requirements and standards and identifies major Environmental, Safety and Health Program initiatives and accomplishments for 1994. As a result of the end of Department of Energy Defense Programs mission production on September 30, 1994, considerable changes at the Pinellas Plant occurred. These changes, which included transitioning the plant toward alternate use in support of economic development and safe shutdown, both increased and heightened Environmental, Safety and Health responsibilities. In December 1994, the Department of Energy announced it had reached an agreement to sell the Pinellas Plant to the Pinellas County Industry Council in March 1995. The plant is being leased back by the Department of Energy through September 1997 to complete safe shutdown, reconfiguration, transfer of equipment to other Department of Energy production facilities, and transition to commercial ventures. Permit modifications and transfers will be completed during 1995 to reflect the new ownership by the Pinellas County Industry Council and to include new tenants as needed

  5. Environmental health scoping study at Bruce Heavy Water Plant

    International Nuclear Information System (INIS)

    Prior, M.; Mostrom, M.; Coppock, R.; Florence, Z.

    1995-10-01

    There are concerns that hydrogen sulfide released from the Heavy Water Plant near Kincardine, Ontario may be the cause of the mortalities and morbidities observed in a nearby flock of sheep. The Philosopher's Wool sheep farm is about four kilometres south-southeast of the Bruce Heavy Water Plant. Ontario Hydro, the owner and operator of the Bruce Heavy Water Plant, claims that hydrogen sulphide emissions from the Bruce Heavy Water Plant are within regulatory limits and well below levels that cause harm. Accordingly, the Atomic Energy Control Board commissioned the Alberta Environmental Centre, Alberta Department of Environmental Protection, to develop a scoping study for this environmental health issue. The first objective was to describe a field investigation model to define clearly the environmental health and operation of the sheep farm. The second objective was to describe possible exposure patterns and develop a holistic environmental pathway model. If appropriate, the third study objective was to describe animal models of the actual situation to elucidate specific aspects of the environmental health concerns. It was not the objective of this report to provide a definitive answer to the present environmental health issue. Ontario Hydro provided data to the Alberta Environmental Centre, as di the sheep farmer, the attending veterinarian, the University of Guelph study team, and the Atomic Energy Control Board. A six-tiered strategy of sequential evaluations of the ovine health problem is based on the multiple-response paradigm. It assumes the observed ovine health results are the result of multiple effector events. Each tier constitutes a separate, but inter-related, study. Sequential evaluation and feedback of each tier allow sound scientific judgements and efficient use of resources. (author). 59 refs., 11 tabs., 22 figs

  6. Baseline survey for rare plant species and native plant communities within the Kamehameha Schools 'Lupea Safe Harbor Planning Project Area, North Kona District, Island of Hawai'i

    Science.gov (United States)

    Jacobi, James; Warshauer, F. R.; Price, Jonathan

    2010-01-01

    Kamehameha Schools, in conjunction with several federal, state, and private organizations, has proposed to conduct conservation management on approximately 5,340 ha (~13,200 acres) of land they own in the vicinity of Kīpukalupea in the North Kona District on the island of Hawai'i. The goal of this program is to restore and enhance the habitat to benefit native plant and animal populations that are currently, or were formerly, found in this site. The initial phase of this project has been focused on various activities including conducting baseline surveys for bird and plant species so Kamehameha Schools could develop a Safe Harbor Agreement (SHA) for the proposed project lands relative to the habitat management and species reintroduction efforts they would like to conduct in the Lupea Project area. This report summarizes methods that were used to collect field data on plant species and communities within the project area, and the results of that initial survey. The information was used to calculate baseline values for all listed threatened or endangered plant species found, or expected to be found, within the project area, and to design a monitoring program to assess changes in plant communities and rare plant species relative to management activities over the duration of the SHA.

  7. Generic environmental impact statement for license renewal of nuclear plants

    International Nuclear Information System (INIS)

    1996-05-01

    Volume 2 of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants contains the appendices. These include: (A) General characterisitics and environmental settings of domestic nuclear plants, (B) Definition of impact initiators, (C) Socioeconomics and case studies, (D) Aquatic organisms and human health, (E) Radiation protection considerations, (F) Methodology for assessing impacts to aquatic ecology and water resources, (G) Postulated accidents, and (H) Environmental statutes and regulations affecting license renewal

  8. Social and environmental aspects of a sewage sludge irradiation plant

    International Nuclear Information System (INIS)

    Mangussi, J.

    2000-01-01

    The critical environmental parameters involved in an environmental impact study for a 700,000 Ci of 60 Co sewage sludge irradiation plant are described and analyzed. The plant is the first that will operate in Argentina and it is located in a town of 500,000 inhabitants, in an agricultural region with no nuclear tradition. The position of the environmental authorities and of the public opinion is analyzed. Possible information alternatives are proposed. (author)

  9. Environmental settings for selected US Department of Energy installations - support information for the programmatic environmental impact statement and the baseline environmental management report

    Energy Technology Data Exchange (ETDEWEB)

    Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Fosmire, C.J.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

    1995-05-01

    This report contains the environmental setting information developed for 25 U.S. Department of Energy (DOE) installations in support of the DOE`s Programmatic Environmental Impact Study (PEIS) and the Baseline Environmental Management Report (BEMR). The common objective of the PEIS and the BEMR is to provide the public with information about the environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that radiological and hazardous contaminants pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS and BEMR schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same, time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry.

  10. Environmental settings for selected US Department of Energy installations - support information for the programmatic environmental impact statement and the baseline environmental management report

    International Nuclear Information System (INIS)

    Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Fosmire, C.J.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

    1995-05-01

    This report contains the environmental setting information developed for 25 U.S. Department of Energy (DOE) installations in support of the DOE's Programmatic Environmental Impact Study (PEIS) and the Baseline Environmental Management Report (BEMR). The common objective of the PEIS and the BEMR is to provide the public with information about the environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that radiological and hazardous contaminants pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS and BEMR schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same, time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry

  11. Krsko Nuclear Power Plant's Environmental Management System in Compliance with ISO 14001:2004

    International Nuclear Information System (INIS)

    Kusar, A.; Kavsek, D.

    2010-01-01

    Krsko Nuclear Power Plant (NPP) pays special attention to environmental protection and practices environmental safety in all plant processes and management. In 2008, Krsko NPP introduced the Environmental Management System in compliance with ISO 14001:2004 standard. The plant management announced the Environmental policy which is a part of the business strategy of Krsko NPP which is an eco-friendly company. The Policy is a commitment of the plant management and all staff to act in compliance with requirements of ISO 14001:2004. The standard served as a basis for developing some new documentation such as Environmental Management System Quality Manual, Environmental planning procedures identifying legal and other requirements, Register of environmental aspects, Register of legal and other requirements etc. When establishing the Register of environmental aspects, all possible environmental impacts of the plant were carefully reviewed and estimated. Following the introduction and certification audit in October and December 2008 of Bureau Veritas Certification, Krsko NPP was awarded certificate ISO 14001:2004 attesting conformity of its Environmental Management System with this standard. The Environmental Certificate means that Krsko NPP will promote a positive environmental culture and maintain a safe, healthy and environmentally-sound workplace for all its employees, contractors and visitors.(author).

  12. Environmental impacts of power plants and transmission lines in power system planning

    International Nuclear Information System (INIS)

    Miracapillo, C.; Moreschini, G.; Rome Univ. 'La Sapienza'

    1992-01-01

    This paper deals with a criterion to assess the environmental impacts of power plants and transmission lines in power system planning. First, the effects of hydro-plants, thermal plants and transmission lines are reviewed. Then, a number of methods for the evaluation of the environmental impacts of civil and industrial plants are described. A new criterion is proposed to introduce the evaluation of the environmental impact and related costs into methods for power system planning. Finally, the criterion is applied to a simple case

  13. Environmental and security challenges of nuclear plants

    International Nuclear Information System (INIS)

    Omar, A.S.

    2014-01-01

    The world population increase, the acceleration of global requirement for development and the need to expand energy production, have led to the depletion of natural resources. The international efforts are increasing to get clean, safe and economical energy sources . The electricity generated from nuclear energy considers less polluting and high economic competitiveness as well as reliability and efficiency. The nuclear power plants projects face significant challenges, especially after two major accidents, in Chernobyl 1986 and Fukushima 2011 including the fears of radiation effects, nuclear waste management and nuclear proliferation issues, as well as the lack of public acceptance. So those bodies interested in operating nuclear power plants work to increase nuclear safety standards, review the nuclear facilities safety, know the strict application of laws, seek to prove the economic competitiveness, maintain environmental security, assist in the nonproliferation regime and gain public acceptance. This article discusses the most important environmental and security challenges of nuclear power plants. It highlights the importance of the peaceful uses of nuclear energy as a source of sustainable development and environmental security. It also offers a number of recommendations to support the Arab countries trend towards the inclusion of nuclear energy option within their national programs to generate electricity. (author)

  14. Environmental impact due to nuclear power plants

    International Nuclear Information System (INIS)

    Kellermann, O.; Balfanz, H.P.

    1975-01-01

    The environmental impact due to nuclear power plants is smaller than that due to fossil-fired power plants. The risks of the nuclear power plant operation are determined by the quantity and the probability of the release of radioactive materials. According to the value, the risks of normal operation can be compared to the accident risks. An attempt should be made to effectively reduce the remaining risk at unfavourable sites with the emphasis on accidents with larger effects than design basis accidents. (orig./LH) [de

  15. Environmental monitoring at the Savannah River Plant. Annual report, 1976

    International Nuclear Information System (INIS)

    Ashley, C.; Zeigler, C.C.

    1978-03-01

    The environmental monitoring program at the Savannah River Plant (SRP) provides reliable measurement of radioactive materials released at the source (approximately 40 locations) and present in the environment (approximately 500 locations). In recent years, water-quality testing and analysis have become an essential part of the environmental monitoring program. Aqueous discharges to plant streams are monitored for nonradioactive materials by chemical analyses of water sampled in flowing streams (approximately 25 locations). A brief discussion of plant releases to the environment and radioactive and nonradioactive materials detected in the environment are presented. The appendices contain data analysis and quality control information, sensitivities of laboratory analyses, tables of environmental sample analyses, and maps of sampling locations

  16. Envirotyping for deciphering environmental impacts on crop plants.

    Science.gov (United States)

    Xu, Yunbi

    2016-04-01

    Global climate change imposes increasing impacts on our environments and crop production. To decipher environmental impacts on crop plants, the concept "envirotyping" is proposed, as a third "typing" technology, complementing with genotyping and phenotyping. Environmental factors can be collected through multiple environmental trials, geographic and soil information systems, measurement of soil and canopy properties, and evaluation of companion organisms. Envirotyping contributes to crop modeling and phenotype prediction through its functional components, including genotype-by-environment interaction (GEI), genes responsive to environmental signals, biotic and abiotic stresses, and integrative phenotyping. Envirotyping, driven by information and support systems, has a wide range of applications, including environmental characterization, GEI analysis, phenotype prediction, near-iso-environment construction, agronomic genomics, precision agriculture and breeding, and development of a four-dimensional profile of crop science involving genotype (G), phenotype (P), envirotype (E) and time (T) (developmental stage). In the future, envirotyping needs to zoom into specific experimental plots and individual plants, along with the development of high-throughput and precision envirotyping platforms, to integrate genotypic, phenotypic and envirotypic information for establishing a high-efficient precision breeding and sustainable crop production system based on deciphered environmental impacts.

  17. Baseline risk assessment for groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-14

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are evaluating conditions in groundwater and springs at the DOE chemical plant area and the DA ordnance works area near Weldon Spring, Missouri. The two areas are located in St. Charles County, about 48 km (30 mi) west of St. Louis. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium-processing activities conducted by the U.S. Atomic Energy Commission in the 1950s and 1960s and explosives-production activities conducted by the U.S. Army (Army) in the 1940s. The 6,974-ha (17,232-acre) ordnance works area is primarily chemically contaminated as a result of trinitrotoluene (TNT) and dinitrotoluene (DNT) manufacturing activities during World War II. This baseline risk assessment (BRA) is being conducted as part of the remedial investigation/feasibility study (RUFS) required under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. The purpose of the BRA is to evaluate potential human health and ecological impacts from contamination associated with the groundwater operable units (GWOUs) of the chemical plant area and ordnance works area. An RI/FS work plan issued jointly in 1995 by the DOE and DA (DOE 1995) analyzed existing conditions at the GWOUs. The work plan included a conceptual hydrogeological model based on data available when the report was prepared; this model indicated that the aquifer of concern is common to both areas. Hence, to optimize further data collection and interpretation efforts, the DOE and DA have decided to conduct a joint RI/BRA. Characterization data obtained from the chemical plant area wells indicate that uranium is present at levels slightly higher than background, with a few concentrations exceeding the proposed U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 20 {micro}g/L (EPA 1996c). Concentrations of other radionuclides (e

  18. Baseline glucose level is an individual trait that is negatively associated with lifespan and increases due to adverse environmental conditions during development and adulthood.

    Science.gov (United States)

    Montoya, Bibiana; Briga, Michael; Jimeno, Blanca; Moonen, Sander; Verhulst, Simon

    2018-05-01

    High baseline glucose levels are associated with pathologies and shorter lifespan in humans, but little is known about causes and consequences of individual variation in glucose levels in other species. We tested to what extent baseline blood glucose level is a repeatable trait in adult zebra finches, and whether glucose levels were associated with age, manipulated environmental conditions during development (rearing brood size) and adulthood (foraging cost), and lifespan. We found that: (1) repeatability of glucose levels was 30%, both within and between years. (2) Having been reared in a large brood and living with higher foraging costs as adult were independently associated with higher glucose levels. Furthermore, the finding that baseline glucose was low when ambient temperature was high, and foraging costs were low, indicates that glucose is regulated at a lower level when energy turnover is low. (3) Survival probability decreased with increasing baseline glucose. We conclude that baseline glucose is an individual trait negatively associated with survival, and increases due to adverse environmental conditions during development (rearing brood size) and adulthood (foraging cost). Blood glucose may be, therefore, part of the physiological processes linking environmental conditions to lifespan.

  19. Environmental analysis for pipeline gas demonstration plants

    Energy Technology Data Exchange (ETDEWEB)

    Stinton, L.H.

    1978-09-01

    The Department of Energy (DOE) has implemented programs for encouraging the development and commercialization of coal-related technologies, which include coal gasification demonstration-scale activities. In support of commercialization activities the Environmental Analysis for Pipeline Gas Demonstration Plants has been prepared as a reference document to be used in evaluating potential environmental and socioeconomic effects from construction and operation of site- and process-specific projects. Effluents and associated impacts are identified for six coal gasification processes at three contrasting settings. In general, impacts from construction of a high-Btu gas demonstration plant are similar to those caused by the construction of any chemical plant of similar size. The operation of a high-Btu gas demonstration plant, however, has several unique aspects that differentiate it from other chemical plants. Offsite development (surface mining) and disposal of large quantities of waste solids constitute important sources of potential impact. In addition, air emissions require monitoring for trace metals, polycyclic aromatic hydrocarbons, phenols, and other emissions. Potential biological impacts from long-term exposure to these emissions are unknown, and additional research and data analysis may be necessary to determine such effects. Possible effects of pollutants on vegetation and human populations are discussed. The occurrence of chemical contaminants in liquid effluents and the bioaccumulation of these contaminants in aquatic organisms may lead to adverse ecological impact. Socioeconomic impacts are similar to those from a chemical plant of equivalent size and are summarized and contrasted for the three surrogate sites.

  20. The environmental impact from an offshore plant

    International Nuclear Information System (INIS)

    Larsson, A.-K.

    1994-01-01

    Wind measurements in different countries have shown the existence of a large energy potential in offshore winds. Taking into consideration the limited suitable area on land for wind power plants it is essential to know the environmental influence from and on an offshore plant. The first offshore wind power plant was built in Sweden in 1990 in order to examine the influence on birds, fish and fishing, shipping, public opinion, maintenance and the effects on foundation from waves and ice. So far, the programme shows that the birds try to avoid the plant by flying further away from it out over the sea. (Author)

  1. 78 FR 66892 - BASF Plant Science LP; Availability of Plant Pest Risk Assessment and Environmental Assessment...

    Science.gov (United States)

    2013-11-07

    .... Kevin Shea, Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2013-26701 Filed 11-6-13... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0028] BASF Plant Science LP; Availability of Plant Pest Risk Assessment and Environmental Assessment for...

  2. Experience with environmental sampling at gas centrifuge enrichment plants

    International Nuclear Information System (INIS)

    Ekenstam, G. af; Bush, W.; Janov, J.; Kuhn, E.; Ryjinski, M.

    2001-01-01

    Environmental sampling has been used routinely by the IAEA since 1996 after the IAEA Board of Governors approved it in March 1995 as a new technique to strengthen safeguards and improve efficiency. In enrichment plants it is used to confirm that there has been no production of highly enriched uranium (HEU), or production of uranium at above the declared enrichment. The use of environmental sampling is based on the assumption that every process, no matter how leak tight, will release small amounts of process material to the environment. Even though these releases of nuclear material are extremely small in gas centrifuge enrichment plants, and well below levels of concern from a health physics and safety standpoint, they are detectable and their analysis provides an indication of the enrichment of the material that has been processed in the plant. The environmental samples at enrichment plants are collected by swiping selected areas of the plant with squares of cotton cloth (10x10 cm) from sampling kits prepared in ultra clean condition. The squares of cotton cloth sealed in plastic bags are sent for analysis to the Network Analytical Laboratories. The analysis includes the measurement of the uranium isotopic composition in uranium-containing particles by Thermal lonization Mass Spectroscopy (TIMS) or Secondary ION Mass Spectroscopy (SIMS). Since the implementation of environmental sampling, swipes have been collected from 240 sampling points at three gas centrifuge plants of URENCO, which have a total throughput of more than 8,000 tonnes of uranium per year. The particle analysis results generally reflected the known operational history of the plants and confirmed that they had only been operated to produce uranium with enrichment less than 5% 235 U. The information about the content of the minor isotopes 234 U and 236 U also indicates that depleted and recycled uranium were sometimes used as feed materials in some plants. An example is given of the TIMS particle

  3. Final environmental statement related to the operation of Watts Bar Nuclear Plant, Units 1 and 2: Docket Numbers 50-390 and 50-391, Tennessee Valley Authority. Supplement Number 1

    International Nuclear Information System (INIS)

    1995-04-01

    The Final Environmental Statement-Operating License (FES-OL) issued in 1978 represents the Nuclear Regulatory Commission's (NRC's) previous environmental review related to the operation of Watts Bar Nuclear (WBN) Plant. The NRC staff has determined that it is appropriate to re-examine the issues associated with the environmental review before issuance of an operating license. The purpose of this NRC review is to discuss the effects of observed changes in the environment and to evaluate the changes in environmental impacts that have occurred as a result of changes in the WBN Plant design and proposed methods of operations since the last environmental review. A full scope of environmental topics has been evaluated, including regional demography, land and water use, meteorology, terrestrial and aquatic ecology, radiological and non-radiological impacts on humans and the environment, socioeconomic impacts, and environmental justice. The staff concluded that there are no significant changes in the environmental impacts since the NRC 1978 FES-OL from changes in plant design, proposed methods of operations, or changes in the environment. The Tennessee Valley Authority's (TVA's) preoperational and operational monitoring programs were reviewed and found to be appropriate for establishing baseline conditions and ongoing assessments of environmental impacts. The staff also conducted an analysis of plant operation with severe accident mitigation design alternatives (SAMDAs) and concluded that none of the SAMDAs, beyond the three procedural changes that the TVA committed to implement, would be cost-beneficial for further mitigating environmental impacts

  4. Environmental monitoring at the Savannah River Plant. Annual report, 1974

    International Nuclear Information System (INIS)

    Ashley, C.; Zeigler, C.C.

    1975-08-01

    Results obtained from the environmental radioactivity monitoring program at the Savannah River Plant (SRP) during 1974 are summarized. A brief discussion of plant releases to the environment and radioactivity detected in the environment is presented in the following text, figures, and tables. The appendices contain tables of results from environmental samples analyses, sensitivities of laboratory analyses, and maps of sampling locations. (auth)

  5. Environmental monitoring at the Savannah River Plant. Annual report, 1975

    International Nuclear Information System (INIS)

    Ashley, C.; Zeigler, C.C.

    1975-01-01

    The environmental monitoring program at the Savannah River Plant (SRP) provides reliable measurement of radioactive materials both released at the source (approximately 40 locations) and concentrated in the environment (approximately 500 locations). In recent years, water quality testing and analysis have become an essential part of the environmental monitoring program. Aqueous discharges to plant streams are monitored for nonradioactive materials by chemical analyses of water sampled in flowing streams (approximately 25 locations). A brief discussion of plant releases to the environment and radioactive and nonradioactive materials detected in the environment are presented in the following text, figures, and tables. The appendices contain an interpretation of data treatment, tables of results of environmental sample analyses, sensitivities of laboratory analyses, and maps of sampling locations

  6. Environmental procedures for thermoelectric power plants by national mineral coal

    International Nuclear Information System (INIS)

    Serra, M.T.F.; Verney Gothe, C.A. de; Silva Ramos, R. da

    1990-01-01

    This paper presents the environmental impacts decursive of utilization of South-Brazilian mineral coal to generation of electric energy. This environmental impacts and alternatives of attenuating measures are presented and evaluated, containing the totality of productive cycle: mining, processing, transport, stock piling and use in thermoelectric power plants. Environmental procedures are systematized for first time, in order to be observed in whole expansion of coal thermoelectric generator park. The conception of power plants and site studies of their useful lives are also included. (C.M.). 19 figs, 24 tabs

  7. Plant responses to environmental stresses-from gene to biotechnology.

    Science.gov (United States)

    Ahanger, Mohammad Abass; Akram, Nudrat Aisha; Ashraf, Muhammad; Alyemeni, Mohammed Nasser; Wijaya, Leonard; Ahmad, Parvaiz

    2017-07-01

    Increasing global population, urbanization and industrialization are increasing the rate of conversion of arable land into wasteland. Supplying food to an ever-increasing population is one of the biggest challenges that agriculturalists and plant scientists are currently confronting. Environmental stresses make this situation even graver. Despite the induction of several tolerance mechanisms, sensitive plants often fail to survive under environmental extremes. New technological approaches are imperative. Conventional breeding methods have a limited potential to improve plant genomes against environmental stress. Recently, genetic engineering has contributed enormously to the development of genetically modified varieties of different crops such as cotton, maize, rice, canola and soybean. The identification of stress-responsive genes and their subsequent introgression or overexpression within sensitive crop species are now being widely carried out by plant scientists. Engineering of important tolerance pathways, like antioxidant enzymes, osmolyte accumulation, membrane-localized transporters for efficient compartmentation of deleterious ions and accumulation of essential elements and resistance against pests or pathogens is also an area that has been intensively researched. In this review, the role of biotechnology and its successes, prospects and challenges in developing stress-tolerant crop cultivars are discussed.

  8. Generic environmental impact statement for license renewal of nuclear plants. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This GEIS examines the possible environmental impacts that could occur as a result of renewing the licenses of individual nuclear power plants under 10 CFR 54. To the extent possible, it establishes the bounds and significance of these potential impacts. The analysis encompasses all operating light-water reactors. For each type of environmental impact, the GEIS attempts to establish generic findings covering as many plants as possible. While plant and site-specific information is used in developing the generic findings, the NRC does not intend for the GEIS to be a compilation of individual plant environmental impacts statements. This document has three principal objectives: (1) to provide an understanding of the types and severity of environmental impacts that may occur as a result of license renewal, (2) to identify and assess those impacts that are expected to be generic to license renewal, and (3) to support rulemaking (10 CFR 51) to define the number and scope of issues that need to be addressed by the applicants in plant-by-plant license renewal proceedings

  9. Annual radiological environmental monitoring report, Watts Bar Nuclear Plant

    International Nuclear Information System (INIS)

    1988-05-01

    This report describes the preoperational environmental radiological monitoring program conducted by TVA in the vicinity of the Watts Bar Nuclear Plant (WBN) in 1988. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas that will not be influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. During plant operations, results from stations near the plant will be compared with concentrations from control stations and with preoperational measurements to determine potential impacts to the public. The exposures calculated from environmental samples were contributed by naturally occurring radioactive materials, from materials commonly found in the environment as a result of atmospheric fallout, or from the operation of other nuclear facilities in the area. Since WBN has not operated, there has been no contribution of radioactivity from the plant to the environment. 4 refs., 2 figs., 1 tab

  10. Environmental Impact Assessment for Olkiluoto 4 Nuclear Power Plant Unit in Finland

    International Nuclear Information System (INIS)

    Dersten, Riitta; Gahmberg, Sini; Takala, Jenni

    2008-01-01

    In order to improve its readiness for constructing additional production capacity, Teollisuuden Voima Oyj (TVO) initiated in spring 2007 the environmental impact assessment procedure (EIA procedure) concerning a new nuclear power plant unit that would possibly be located at Olkiluoto. When assessing the environmental impacts of the Olkiluoto nuclear power plant extension project, the present state of the environment was first examined, and after that, the changes caused by the projects as well as their significance were assessed, taking into account the combined impacts of the operations at Olkiluoto. The environmental impact assessment for the planned nuclear power plant unit covers the entire life cycle of the plant unit. (authors)

  11. Environmental Impact Assessment for Olkiluoto 4 Nuclear Power Plant Unit in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Dersten, Riitta; Gahmberg, Sini; Takala, Jenni [Teollisuuden Voima Oyj, Olkiluoto, FI-27160 Eurajoki (Finland)

    2008-07-01

    In order to improve its readiness for constructing additional production capacity, Teollisuuden Voima Oyj (TVO) initiated in spring 2007 the environmental impact assessment procedure (EIA procedure) concerning a new nuclear power plant unit that would possibly be located at Olkiluoto. When assessing the environmental impacts of the Olkiluoto nuclear power plant extension project, the present state of the environment was first examined, and after that, the changes caused by the projects as well as their significance were assessed, taking into account the combined impacts of the operations at Olkiluoto. The environmental impact assessment for the planned nuclear power plant unit covers the entire life cycle of the plant unit. (authors)

  12. Radiation environmental monitoring and assessment of plant-221 site ten years after decommissioning

    International Nuclear Information System (INIS)

    Li Yang; Gu Zhijie; Pan Wei; Ren Xiaona; Hu Xiaolin; She Haiqiang

    2011-01-01

    More than 10 years have passed since nuclear facility decommissioning practice for Plant-221 finished. Environmental radiation monitoring and post assessment of the decommissioning site of Plant-221 was carried out during 2003-2006, which was organized by Department of Environmental Protection and executed by China Institute for Radiation Protection, Environmental Radiation Monitoring station of Qinghai Province, etc. It shows that the decommissioning practice for Plant-221 complied with relevant limits for decommissioning, and its environmental radiation situation has not had significant change in general after 10 years, and the potential impact to the public and the environmental is acceptable. (authors)

  13. Baseline recommendations for greenhouse gas mitigation projects in the electric power sector

    Energy Technology Data Exchange (ETDEWEB)

    Kartha, Sivan; Lazarus, Michael [Stockholm Environment Institute/Tellus Institute, Boston, MA (United States); Bosi, Martina [International Energy Agency, Paris, 75 (France)

    2004-03-01

    The success of the Clean Development Mechanism (CDM) and other credit-based emission trading regimes depends on effective methodologies for quantifying a project's emissions reductions. The key methodological challenge lies in estimating project's counterfactual emission baseline, through balancing the need for accuracy, transparency, and practicality. Baseline standardisation (e.g. methodology, parameters and/or emission rate) can be a means to achieve these goals. This paper compares specific options for developing standardised baselines for the electricity sector - a natural starting point for baseline standardisation given the magnitude of the emissions reductions opportunities. The authors review fundamental assumptions that baseline studies have made with respect to estimating the generation sources avoided by CDM or other emission-reducing projects. Typically, studies have assumed that such projects affect either the operation of existing power plants (the operating margin) or the construction of new generation facilities (the build margin). The authors show that both effects are important to consider and thus recommend a combined margin approach for most projects, based on grid-specific data. They propose a three-category framework, according to projects' relative scale and environmental risk. (Author)

  14. Environmental impacts of coal mine and thermal power plant to the surroundings of Barapukuria, Dinajpur, Bangladesh.

    Science.gov (United States)

    Hossain, Md Nazir; Paul, Shitangsu Kumar; Hasan, Md Muyeed

    2015-04-01

    The study was carried out to analyse the environmental impacts of coal mine and coal-based thermal power plant to the surrounding environment of Barapukuria, Dinajpur. The analyses of coal, water, soil and fly ash were carried out using standard sample testing methods. This study found that coal mining industry and coal-based thermal power plant have brought some environmental and socio-economic challenges to the adjacent areas such as soil, water and air pollution, subsidence of agricultural land and livelihood insecurity of inhabitants. The pH values, heavy metal, organic carbon and exchangeable cations of coal water treated in the farmland soil suggest that coal mining deteriorated the surrounding water and soil quality. The SO4(2-) concentration in water samples was beyond the range of World Health Organisation standard. Some physico-chemical properties such as pH, conductivity, moisture content, bulk density, unburned carbon content, specific gravity, water holding capacity, liquid and plastic limit were investigated on coal fly ash of Barapukuria thermal power plant. Air quality data provided by the Barapukuria Coal Mining Company Limited were contradictory with the result of interview with the miners and local inhabitants. However, coal potentially contributes to the development of economy of Bangladesh but coal mining deteriorates the environment by polluting air, water and soil. In general, this study includes comprehensive baseline data for decision makers to evaluate the feasibility of coal power industry at Barapukuria and the coalmine itself.

  15. Environmental assessment for commercialization of the Mound Plant

    International Nuclear Information System (INIS)

    1994-01-01

    In November 1993 US DOE decided to phase out operations at the Mound Plant in Miamisburg, Ohio, with the goal of releasing the site for commercial use. The broad concept is to transform the plant into an advanced manufacturing center with the main focus on commercializing products and other technology. DOE proposes to lease portions of the Mound Plant to commercial enterprises. This Environmental Impact statement has a finding of no significant impact in reference to such action

  16. Carbon and Nitrogen Isotopic Survey of Northern Peruvian Plants: Baselines for Paleodietary and Paleoecological Studies

    Science.gov (United States)

    Szpak, Paul; White, Christine D.; Longstaffe, Fred J.; Millaire, Jean-François; Vásquez Sánchez, Víctor F.

    2013-01-01

    The development of isotopic baselines for comparison with paleodietary data is crucial, but often overlooked. We review the factors affecting the carbon (δ13C) and nitrogen (δ15N) isotopic compositions of plants, with a special focus on the carbon and nitrogen isotopic compositions of twelve different species of cultivated plants (n = 91) and 139 wild plant species collected in northern Peru. The cultivated plants were collected from nineteen local markets. The mean δ13C value for maize (grain) was −11.8±0.4 ‰ (n = 27). Leguminous cultigens (beans, Andean lupin) were characterized by significantly lower δ15N values and significantly higher %N than non-leguminous cultigens. Wild plants from thirteen sites were collected in the Moche River Valley area between sea level and ∼4,000 meters above sea level (masl). These sites were associated with mean annual precipitation ranging from 0 to 710 mm. Plants growing at low altitude sites receiving low amounts of precipitation were characterized by higher δ15N values than plants growing at higher altitudes and receiving higher amounts of precipitation, although this trend dissipated when altitude was >2,000 masl and MAP was >400 mm. For C3 plants, foliar δ13C was positively correlated with altitude and precipitation. This suggests that the influence of altitude may overshadow the influence of water availability on foliar δ13C values at this scale. PMID:23341996

  17. Carbon and nitrogen isotopic survey of northern peruvian plants: baselines for paleodietary and paleoecological studies.

    Directory of Open Access Journals (Sweden)

    Paul Szpak

    Full Text Available The development of isotopic baselines for comparison with paleodietary data is crucial, but often overlooked. We review the factors affecting the carbon (δ(13C and nitrogen (δ(15N isotopic compositions of plants, with a special focus on the carbon and nitrogen isotopic compositions of twelve different species of cultivated plants (n = 91 and 139 wild plant species collected in northern Peru. The cultivated plants were collected from nineteen local markets. The mean δ(13C value for maize (grain was -11.8±0.4 ‰ (n = 27. Leguminous cultigens (beans, Andean lupin were characterized by significantly lower δ(15N values and significantly higher %N than non-leguminous cultigens. Wild plants from thirteen sites were collected in the Moche River Valley area between sea level and ∼4,000 meters above sea level (masl. These sites were associated with mean annual precipitation ranging from 0 to 710 mm. Plants growing at low altitude sites receiving low amounts of precipitation were characterized by higher δ(15N values than plants growing at higher altitudes and receiving higher amounts of precipitation, although this trend dissipated when altitude was >2,000 masl and MAP was >400 mm. For C(3 plants, foliar δ(13C was positively correlated with altitude and precipitation. This suggests that the influence of altitude may overshadow the influence of water availability on foliar δ(13C values at this scale.

  18. Baseline risk assessment for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1999-01-01

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are evaluating conditions in groundwater and springs at the DOE chemical plant area and the DA ordnance works area near Weldon Spring, Missouri. The two areas are located in St. Charles County, about 48 km (30 mi) west of St. Louis. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium-processing activities conducted by the U.S. Atomic Energy Commission in the 1950s and 1960s and explosives-production activities conducted by the U.S. Army (Army) in the 1940s. The 6,974-ha (17,232-acre) ordnance works area is primarily chemically contaminated as a result of trinitrotoluene (TNT) and dinitrotoluene (DNT) manufacturing activities during World War II. This baseline risk assessment (BRA) is being conducted as part of the remedial investigation/feasibility study (RUFS) required under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. The purpose of the BRA is to evaluate potential human health and ecological impacts from contamination associated with the groundwater operable units (GWOUs) of the chemical plant area and ordnance works area. An RI/FS work plan issued jointly in 1995 by the DOE and DA (DOE 1995) analyzed existing conditions at the GWOUs. The work plan included a conceptual hydrogeological model based on data available when the report was prepared; this model indicated that the aquifer of concern is common to both areas. Hence, to optimize further data collection and interpretation efforts, the DOE and DA have decided to conduct a joint RI/BRA. Characterization data obtained from the chemical plant area wells indicate that uranium is present at levels slightly higher than background, with a few concentrations exceeding the proposed U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 20 microg/L (EPA 1996c). Concentrations of other radionuclides (e

  19. Environmental radioactive contamination and its control for nuclear power plants

    International Nuclear Information System (INIS)

    Shi Zhongqi; Qu Jingyuan; Cui Yongli

    1998-01-01

    The environmental radioactive releases and exposure to human being due to operation of nuclear power plants in the world and in China, environmental contamination and consequences caused by severe nuclear power plant accidents in the history, control of the radioactive contamination in China, and some nuclear laws on the radioactive contamination control established by international organizations and USA etc. are described according to literature investigation and research. Some problems and comments in radioactive contamination control for nuclear power plants in China are presented. Therefore, perfecting laws and regulations and enhancing surveillances on the contamination control are recommended

  20. Annual radiological environmental monitoring report: Watts Bar Nuclear Plant, 1991

    International Nuclear Information System (INIS)

    1992-04-01

    This report describes the preoperational environmental radiological monitoring program conducted by TVA in the vicinity of the Watts Bar Nuclear Plant (WBN) in 1991. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas that will not be influenced by plant operations. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. During plant operations, results from stations near the plant will be compared with concentrations from control stations and with preoperational measurements to determine potential impacts to the public. Exposures calculated from environmental samples were contributed by naturally occurring radioactive materials, from materials commonly found in the environment a a result of atmospheric fallout, or from the operation of other nuclear facilities in the area. Since WBN has not operated, there has been no contribution of radioactivity from the plant to the environment

  1. Annual radiological environmental monitoring report: Watts Bar Nuclear Plant, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    This report describes the preoperational environmental radiological monitoring program conducted by TVA in the vicinity of the Watts Bar Nuclear Plant (WBN) in 1992. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas that will not be influenced by plant operations. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. During plant operations, results from stations near the plant will be compared with concentrations from control stations and with preoperational measurements to determine potential impacts to the public. Exposures calculated from environmental samples were contributed by naturally occurring radioactive materials, from materials commonly found in the environment as a result of atmospheric fallout, or from the operation of other nuclear facilities in the area. Since WBN has not operated, there has been no contribution of radioactivity from the plant to the environment

  2. Protection and environmental supervision activities at ROMAG PROD Plant

    International Nuclear Information System (INIS)

    Chilom, Rodica

    2002-01-01

    The protection and environmental supervision activity at ROMAG PROD heavy water plant is embodied in the very production process. The environmental supervision is done by: 1. the sensing system for H 2 S which monitors H 2 S and other gases 24 h/day on three zones of production storage and transport of H 2 S; 2. daily tightness checking of the installations working with H 2 S; 3. daily analytical checking of the air and water pollutants at seven air sampling checking points in dwelled zones, at the industrial area boundary and at purification stations and water waste discharge points. The water and air environmental components are protected through safe operation of the heavy water installations and of the flue gas installation. The water protection is ensured through optimal operation of the purification facilities, namely: the purification of the water resulting from the isotopic exchange; acid water neutralization station which process the waste water collected from the whole plant; neutralization reservoir for water resulting from ionic exchange; purification station of the sulfate waters resulting from the H 2 S fabrications installation; mud pool. The ROMAG PROD Plant operates according to the ISO 9001 and ISO 14001 standards and reports regularly its activity to the Environmental Protection and Water System Management Authority

  3. Environmental Impacts of Plant-Based Diets: How Does Organic Food Consumption Contribute to Environmental Sustainability?

    Science.gov (United States)

    Lacour, Camille; Seconda, Louise; Allès, Benjamin; Hercberg, Serge; Langevin, Brigitte; Pointereau, Philippe; Lairon, Denis; Baudry, Julia; Kesse-Guyot, Emmanuelle

    2018-01-01

    Studies investigating diet-related environmental impacts have rarely considered the production method of the foods consumed. The objective of the present study, based on the NutriNet-Santé cohort, was to investigate the relationship between a provegetarian score and diet-related environmental impacts. We also evaluated potential effect modifications on the association between a provegetarian score and the environmental impacts of organic food consumption. Food intake and organic food consumption ratios were obtained from 34,442 French adults using a food frequency questionnaire, which included information on organic food consumption for each group. To characterize the overall structure of the diets, a provegetarian score was used to identify preferences for plant-based products as opposed to animal-based products. Moreover, three environmental indicators were used to assess diet-related environmental impacts: greenhouse gas (GHG) emissions, cumulative energy demand (CED), and land occupation. Environmental impacts were assessed using production life cycle assessment (LCA) at the farm level. Associations between provegetarian score quintiles, the level of organic food consumption, and environmental indicators were analyzed using ANCOVAs adjusted for energy, sex, and age. Participants with diets rich in plant-based foods (fifth quintile) were more likely to be older urban dwellers, to hold a higher degree in education, and to be characterized by an overall healthier lifestyle and diet. A higher provegetarian score was associated with lower environmental impacts (GHG emissions Q5vsQ1  = 838/1,664 kg CO 2eq /year, -49.6%, P  impacts but only among participants with diets rich in plant-based products. Future field studies should endeavor to integrate all the components of a sustainable diet, i.e., both diet composition and production methods.

  4. 76 FR 44891 - Monsanto Co.; Availability of Petition, Plant Pest Risk Assessment, and Environmental Assessment...

    Science.gov (United States)

    2011-07-27

    ...] Monsanto Co.; Availability of Petition, Plant Pest Risk Assessment, and Environmental Assessment for... Monsanto petition, our plant pest risk assessment, and our draft environmental assessment for the proposed...-2817 before coming. The petition, draft environmental assessment, and plant pest risk assessment are...

  5. Cogeneration plant environmental impacts, Menaggio, Italy. February 21-22, 1991

    International Nuclear Information System (INIS)

    Piancastelli, E.

    1991-01-01

    Separate abstracts were prepared for 28 papers given at the FIRE (Italian Federation for the Rational use of Energy), February, 1991, convention on cogeneration plant environmental impacts. The topics included: Italian and international normatives giving guidelines on methods to evaluate dual-purpose power plant environmental impacts; gas turbine CO, NOx and suspended particulates emission limits; noise pollution limits and abatement measures; ENEL (Italian National Electricity Board) rate structure for auto-producing industries ceding power to the national grid; international research programs on cogeneration; the use of renewable energy sources for cogeneration systems; the function and role of energy managers; and commercialization of compact cogeneration plants for industry

  6. Environmental-friendly wool fabric finishing by some water plant extracts

    Directory of Open Access Journals (Sweden)

    Šmelcerović Miodrag

    2007-01-01

    Full Text Available In this article, environmental-friendly finishing of wool fabric were processed with several water extract plants, such as hibiscus, St. John's wort, and marigold. The plant extracts have good basis in the commercial dyeing of wool, for garment and carpet industry. At the same time, the environmental-friendly finishing by water extracts plants shows very good fastness of the antimicrobial properties and coloration of wool fabric. From an ecological viewpoint, the substitution of chemical dyes with "natural products" may represent not only a strategy to reduce risk and pollutants but also an opportunity for new markets and new businesses, which can expend involving of ecology in trade policy.

  7. 78 FR 37325 - License Renewal of Nuclear Power Plants; Generic Environmental Impact Statement and Standard...

    Science.gov (United States)

    2013-06-20

    ... Nuclear Power Plants; Generic Environmental Impact Statement and Standard Review Plans for Environmental... for Nuclear Power Plants, Supplement 1: Operating License Renewal'' (ESRP). The ESRP serves as a guide... published a final rule, ``Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating...

  8. Southpoint power plant final environmental impact statement

    International Nuclear Information System (INIS)

    1999-01-01

    This document is the Final Environmental Impact Statement (FEIS) for a proposed lease of acreage on the Fort Mojave Indian Reservation in Mohave County, Arizona for development of a natural gas fired 500 megawatt combined cycle power plant. The Bureau of Indian Affairs (BIA) serves as the federal lead agency and the Fort Mojave Indian Tribe (FMIT) and the Western Area Power Administration (WAPA) are cooperating agencies for the EIS process. The purpose of this document is to provide information to the public and to interested public agencies regarding the environmental consequences of the approval of a long-term lease for the construction and operation of the proposed Southpoint power plant. The FEIS, prepared by Hallock/Gross, Inc. under the direction of the BIA and in cooperation with the FMIT and WAPA, addresses the comparative analysis of alternatives and evaluates the environmental consequences of such alternatives on various resources and addresses public comments. A number of technical reports were used in the preparation of the Draft EIS and FEIS and are available for review as Appendices to this document under separate cover that can be reviewed at the BIA offices which are listed

  9. Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services

    2003-09-17

    The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

  10. Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002

    International Nuclear Information System (INIS)

    Washington Regulatory and Environmental Services

    2003-01-01

    The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED)

  11. Environmental Safety and Health Analytical Laboratory, Pantex Plant, Amarillo, Texas. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-06-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) of the construction and operation of an Environmental Safety and Health (ES ampersand H) Analytical Laboratory and subsequent demolition of the existing Analytical Chemistry Laboratory building at Pantex Plant near Amarillo, Texas. In accordance with the Council on Environmental Quality requirements contained in 40 CFR 1500--1508.9, the Environmental Assessment examined the environmental impacts of the Proposed Action and discussed potential alternatives. Based on the analysis of impacts in the EA, conducting the proposed action, construction of an analytical laboratory and demolition of the existing facility, would not significantly effect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA) and the Council on Environmental Quality regulations in 40 CFR 1508.18 and 1508.27

  12. The evaluation of environmental effects of nuclear power plants

    International Nuclear Information System (INIS)

    Oezyurt, M.; Iyit, L.; Seyitogullari, S.

    2006-01-01

    Energy is today one of the most significant topics in the world. Humans are investigating alternative energy resources due to the fossil energy sources to be exhausted in future. As known, the life of energy resources such as coal and oil is limited. Natural gas will cover the need just for a limited period. On the other hand, developing population will increase the need of energy for the next generation. Therefore, alternative energy has gained much significance in recent years. Nuclear energy is the most criticized energy in public opinion. About 17 pct. of the electric need in the world is being covered by nuclear power plants . This ratio is over 30 pct. in European Union and over 78.2 pct. in France. The most significant risk as regard with environmental pollution is radioactive wastes for these plants. The opposite sides towards nuclear energy claim about the accidents of nuclear power plants and deaths in short and long terms. As long as the security rules are applied, nuclear power plants affect neither human nor environmental health in a detrimental way. The radiation emission scattered by nuclear power plants is very low. In this work, first of all nuclear energy was evaluated from a standpoint of environmental pollution and both positive and negative effects were investigated. As a result, the humanity will have to benefit from all the alternative energy resources , the nuclear energy as well, in order not to live in a dark world. Every technology has its own risks. It seems that if nuclear energy power plants are operated in high technology conditions it will be un given up for humanity

  13. Environmentally Sensitive Areas Surveys Program threatened and endangered species survey: Progress report. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    King, A.L.; Awl, D.J.; Gabrielsen, C.A.

    1994-09-01

    The Endangered Species Act (originally passed in 1973) is a Federal statute that protects both animal and plant species. The Endangered Species Act identifies species which are, without careful management, in danger of becoming extinct and species that are considered threatened. Along with the designation of threatened or endangered, the Endangered Species Act provides for the identification of appropriate habitat for these species. Since 1993, the United States Department of Energy`s (DOE) Environmental Restoration (ER) Program has supported a program to survey the Oak Ridge Reservation (ORR) for threatened and endangered species. The Environmentally Sensitive Areas Surveys Program initiated vascular plant surveys during fiscal year 1993 and vertebrate animal surveys during fiscal year 1994 to determine the baseline condition of threatened and endangered species on the ORR at the present time. Data collected during these surveys are currently aiding Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Investigations on the ORR. They also provide data for ER and Waste Management decision documents, ensure that decisions have technical and legal defensibility, provide a baseline for ensuring compliance with principal legal requirements and will increase public confidence in DOE`s adherence to all related environmental resources rules, laws, regulations, and instructions. This report discusses the progress to date of the threatened and endangered species surveys of the ORR.

  14. Waste Isolation Pilot Plant Annual Site Environmental Report for 2012

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2012 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year; Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS).

  15. Environmental monitoring at the Savannah River Plant. Annual report for 1978

    International Nuclear Information System (INIS)

    Ashley, C.; Zeigler, C.C.

    1981-01-01

    The environmental monitoring program at the Savannah River Plant (SRP) provides reliable measurement of radioactive materials released at the source (approximately 40 locations) and present in the environment (approximately 500 locations). In recent years, the environmental monitoring program has been expanded to include measurements of nonradioactive materials released by SRP. A brief discussion of plant releases to the environment and radioactive and nonradioactive materials detected in the environment are presented. The appendices contain data analysis and quality control information, sensitivities of laboratory analyses, tables of environmental sample analyses, and maps of sampling locations

  16. Environmentally Clean Mitigation of Undesirable Plant Life Using Lasers

    Energy Technology Data Exchange (ETDEWEB)

    Rubenchik, A M; McGrann, T J; Yamamoto, R M; Parker, J M

    2009-07-01

    This concept comprises a method for environmentally clean destruction of undesirable plant life using visible or infrared radiation. We believe that during the blossom stage, plant life is very sensitive to electromagnetic radiation, with an enhanced sensitivity to specific spectral ranges. Small doses of irradiation can arrest further plant growth, cause flower destruction or promote plant death. Surrounding plants, which are not in the blossoming stage, should not be affected. Our proposed mechanism to initiate this effect is radiation produced by a laser. Tender parts of the blossom possess enhanced absorptivity in some spectral ranges. This absorption can increase the local tissue temperature by several degrees, which is sufficient to induce bio-tissue damage. In some instances, the radiation may actually stimulate plant growth, as an alternative for use in increased crop production. This would be dependent on factors such as plant type, the wavelength of the laser radiation being used and the amount of the radiation dose. Practical, economically viable realization of this concept is possible today with the advent of high efficiency, compact and powerful laser diodes. The laser diodes provide an efficient, environmentally clean source of radiation at a variety of power levels and radiation wavelengths. Figure 1 shows the overall concept, with the laser diodes mounted on a movable platform, traversing and directing the laser radiation over a field of opium poppies.

  17. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services (WRES)

    2004-10-25

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

  18. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    International Nuclear Information System (INIS)

    2004-01-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

  19. The growth response of plants to elevated CO2 under non-optimal environmental conditions

    NARCIS (Netherlands)

    Poorter, H.; Pérez-Soba, M.

    2001-01-01

    Under benign environmental conditions, plant growth is generally stimulated by elevated atmospheric CO2 concentrations. When environmental conditions become sub- or supra-optimal for growth, changes in the biomass enhancement ratio (BER; total plant biomass at elevated CO2 divided by plant biomass

  20. The environmental impact of the Ignalina nuclear power plant

    International Nuclear Information System (INIS)

    Drizius, R.; Jasiulionis, R.; Marciulioniene, D.

    1991-01-01

    In the course of design and initial operation of the nuclear power plant in Ignalina several research institutes of the Lithuanian Academy of Sciences performed monitoring measurements in the surroundings and accumulated data on the natural situation with a special interest in the environmental impact of the plant. The ecosystem of lake Druksiai as the cooling pond of the plant was expected to be influenced most. At present sufficient results have been accumulated to conclude a shift from natural equilibrium of the lake ecosystem in spite of the absence of any specific cases of severing the present nature-protecting legislation. At present the lake is an example of a transient environmental system because of the high inertia in most of the natural processes and because certain natural components are known to accumlate the products of release and to transform them. (author)

  1. Pressurized water reactor nuclear power plant. Environmental characterization information report

    International Nuclear Information System (INIS)

    1981-01-01

    The typical plant chosen for characterization is a 10000-MWe nameplate rating with wet-natural-draft cooling towers and modern radwaste control and processing equipment. The process, plant operating parameters, resources needed, and the environmental residuals and products associated with the power plant are presented. Annual resource usage and pollutant discharges are shown in English and metric units, assuming an annual plant capacity factor of 70%. In addition to annual quantities, the summary table gives quantities in terms of 10 12 Btu (about 293 million kWh) of electrical energy produced for comparison among energy processes. Supporting information and calculation procedures for the data are given. Thirteen environmental points of interest are discussed individually. Cost information, typical radioactive releases, and use of cooling ponds as an alternative cooling method are discussed in appendixes. A glossary and list of acronyms and abbreviations are provided

  2. Annual radiological environmental operating report, Browns Ferry Nuclear Plant, 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant in 1988. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. The vast majority of the exposures calculated from environmental samples were contributed by naturally occurring radioactive materials or from materials commonly found in the environment as a result of atmospheric nuclear weapons fallout. Small amounts of Co-60 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public. 3 refs., 2 figs., 2 tabs

  3. National conference on radiation safety of nuclear power plants and their environmental impacts

    International Nuclear Information System (INIS)

    Moravek, J.

    1989-01-01

    The first national conference on radiation safety of nuclear power plants and their environmental impacts was held in Tale (CS), 12 to 15 October, 1987 with the participation of 201 Czechoslovak specialists representing central authorities, research institutes, institutions of higher education, power plants in operation and under construction, water management and hygiene inspection and some production sectors, specialists from Hungary, Poland and the GDR. The participants heard 110 papers. The conference agenda comprised keynote papers presented in plenary session and five specialist sessions: 1. Radiation control of discharges and their surroundings. 2. Monitoring and evaluation of the radiation situation in nuclear power plants. 3. Equipment for monitoring the nuclear power plant and its environs. 4. Mathematical modelling and assessment of the nuclear power plant radiation environmental impact. 5. Evaluation of sources and of the transport of radioactive materials inside the power plant and the minimization of the nuclear power plant's environmental impact. (Z.M.)

  4. Guidance on the environmental risk assessment of plant pests

    DEFF Research Database (Denmark)

    Baker, R.; Candresse, T.; Dormannsne Simon, E.

    2011-01-01

    The European Food Safety Authority (EFSA) requested the Panel on Plant Health to develop a methodology for assessing the environmental risks posed by harmful organisms that may enter, establish and spread in the European Union. To do so, the Panel first reviewed the methods for assessing...... the environmental risks of plant pests that have previously been used in pest risk assessment. The limitations identified by the review led the Panel to define the new methodology for environmental risk assessment which is described in this guidance document. The guidance is primarily addressed to the EFSA PLH...... (biodiversity) and the functional (ecosystem services) aspects of the environment, this new approach includes methods for assessing both aspects for the first time in a pest risk assessment scheme. A list of questions has been developed for the assessor to evaluate the consequences for structural biodiversity...

  5. Comparative evaluation of power plants with CO2 capture. Thermodynamic, economic and environmental performance

    International Nuclear Information System (INIS)

    Petrakopoulou, Fontina

    2011-01-01

    CCS (Carbon Capture and Sequestration) in the energy sector is seen as a bridge technology for CO 2 mitigation, due to the ever-growing environmental impact of anthropogenic-emitted greenhouse gases. In this work, eight power plant concepts using CO 2 capture technologies are assessed based on their efficiency, economic feasibility and environmental footprint. Exergy-based analyses are used for evaluating the considered power plants through comparison with a reference plant without CO 2 capture. While conventional exergy-based analyses provide important information that can lead to improvements in plant performance, additional insight about individual components and the interactions among equipment can aid further assessment. This led to the development of advanced exergy-based analyses, in which the exergy destruction, as well as the associated costs and environmental impacts are split into avoidable/unavoidable and endogenous/exogenous parts. Based on the avoidable parts, the potential for improvement is revealed, while based on the endogenous/exogenous parts, the component interactions are obtained. Among the examined plants with CO 2 capture, the most efficient are those working with oxy-fuel technology. An exergoeconomic analysis shows a minimum increase in the relative investment cost (in Euro/kW) of 80% for the conventional approach (chemical absorption) and an increase of 86% for the oxy-fuel plant with chemical looping combustion. The latter shows a somewhat decreased environmental impact when compared to that of the reference plant. On the contrary, the plant with chemical absorption results in a higher environmental penalty due to its high efficiency penalty. Therefore, accepting that all assumptions and data related to the calculations of the environmental impacts are reliable, efficiency improvement seems to be a more significant factor in potentially decreasing a plant's environmental impact. With advanced exergy-based analyses, interdependencies

  6. Environmental Modeling, A goal of the Baseline Sampling and Analysis program is to determine baseline levels of select priority pollutants and petroleum markers in areas with high probability for oil spills., Published in 1999, 1:24000 (1in=2000ft) scale, Louisiana State University (LSU).

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Environmental Modeling dataset current as of 1999. A goal of the Baseline Sampling and Analysis program is to determine baseline levels of select priority pollutants...

  7. Environmental monitoring report, 1978: Pinellas Plant

    International Nuclear Information System (INIS)

    1979-04-01

    Effluent and environmental monitoring programs maintained by the Pinellas Plant are designed to determine efficiencies of treatment and control mechanisms; to provide measurements of discharge concentrations for comparison with applicable standards; and to assess the concentrations of these discharges in the environment. Small quantities of tritium gas, tritium oxide and krypton-85 gas were released from the plant during the year. Average maximum ground level concentrations of these radioisotopes were all significantly less than 1/10 of 1 percent of the recommended guide for continuous nonoccupational exposure. Off-site releases of liquid effluents were analyzed for compliance with NPDES permit issues for this site by the U.S. Environmental protection Agency. Analyses were performed fo biochemical oxygen demand, suspended solids, fecal coliform bacteria, pH, nitrogen, phosphorus, arsenic, chlorides, chromium, copper, cyanides, detergents, fluorides, iron, lead, mercury, oil plus greases, phenols, turbidity and zinc. All results with the exception of suspended solids were well within permit limits. Site perimeter and off-site air samples for tritium gas and tritium oxide, as well as off-site surface water samples obtained to distances of 9.6 kilometers from the plant site and analyzed for tritium content, showed levels significantly less than 1/10 of 1 percent of the recommended guide for continuous nonoccupational exposure. Calculations were made to determine the radiation doses resulting from releases of tritium oxide and krypton-85 to: an individual at the site boundary; individuals in the closest residential area; and the population within 80 kilometers of the plant site. Calculated doses are exceedingly small when compared to the recommended standards. The total dose commitment to the population residing within 80 kilometers was determined to be 0.40 man-rem as compared to annual dose from natural radiation of 210,747 man-rem

  8. CEZ utility's coal-fired power plants: towards a higher environmental friendliness

    International Nuclear Information System (INIS)

    Kindl, V.; Spilkova, T.; Vanousek, I.; Stehlik, J.

    1996-01-01

    Environmental efforts of the major Czech utility, CEZ a.s., are aimed at reducing air pollution arising from electricity and heat generating facilities. There are 3 main kinds of activity in this respect: phasing out of coal fired power plants; technological provisions to reduce emissions of particulate matter, sulfur dioxide, and nitrogen oxides from those coal fired units that are to remain in operation after 1998; and completion of the Temelin nuclear power plant. In 1995, emissions of particulate matter, sulfur dioxide, nitrogen oxides, and carbon monoxide from CEZ's coal fired power plants were 19%, 79%, 59%, and 60%, respectively, with respect to the situation in 1992. The break-down of electricity generation by CEZ facilities (in GWh) was as follows in 1995: hydroelectric power plants 1673, nuclear power plants 12230, coal fired power plants without desulfurization equipment 30181, and coal fired power plants with desulfurization equipment 2277. Provisions implemented to improve the environmental friendliness of the individual CEZ's coal fired power plants are described in detail. (P.A.). 5 tabs., 1 fig

  9. Safety and environmental aspects of deuterium--tritium fusion power plants: work shop summary

    International Nuclear Information System (INIS)

    1978-05-01

    In September of 1977 a workshop was held on the safety and environmental aspects of fusion power plants to consider potential safety and environmental problems of fusion power plants and to reveal solutions or methods of solving those problems. The objective was to promote incorporation of safety and environmental protection into reactor design, thereby reducing the expense and delay of backfitting safety systems after reactor designs are complete. A dialogue was established between fusion reactor designers and safety and environmental researchers. Four topics, each with several subdivisions, were selected for discussion: radiation exposure, accidents, environmental effects, and plant safety. For each topic, discussion focused on the significance of the problem, and adequacy of current technology to solve the problem, design solutions available and research needed to solve the problem

  10. Image diagnosis of plant function under environmental pollution. Shokubutsu de kankyo osen wo shindansuru

    Energy Technology Data Exchange (ETDEWEB)

    Omasa, K. (National Inst. for Environmental studies, Tsukuba (Japan))

    1993-12-20

    Various physiological reaction of plants would be obstructed and troubles of their growth would be met under environmental pollution. There are also cases that the polluted materials as nutritious components are absorbed by plants. Consequently, if plant's reaction on this environmental pollution would be used, indexes of environmental pollution and environment can be improved. For examples, Ipomoea Nil and Petunia having high reaction on photochemical oxidate are widely used as index plant of air pollution. Zelkova trees and poplars planted as street trees can also greatly absorbed the polluted gas and have a function to clear air. In this paper, a diagnosis method by visualizing plant's reaction on environmental pollution by using technique of image measurement was explained. As devices of usable image measurement, a thermal camera, a solid measuring cameras, an ultrasonic camera, a multi-spectral camera and an X-ray TV camera were given. 6 refs., 4 figs., 1 tab.

  11. Environmental assessment for Mound Plant decontamination and decommissioning projects, Mound Plant, Miamisburg, Ohio

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) for seven decontamination and decommissioning (D ampersand D) projects at the Mound Plant in Miamisburg, Ohio, that have not been previously addressed in the Final Environmental Impact Statement for the Mound Facility (June 1979). Based on the information presented in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and the Department is issuing this Finding of No Significant Impact (FONSI)

  12. Managing Environmentally-Assisted Fatigue in U. S. Plants

    International Nuclear Information System (INIS)

    Gilman, T. D.

    2014-01-01

    Nuclear plants in the United States were originally licensed by the Nuclear Regulatory Commission (NRC) for 40 years of operation, but most of these plans have or are planning on renewing their license to 60 years. Plants are required by federal law to manage the aging effects of systems, structures and components in the scope of license renewal. One of the aging effects is environmentally-assisted fatigue of the primary system vessels and piping. This article discusses the strategies that U. S. utilities have utilized in order to safety NRC concerns with respect to fatigue damage in nuclear plants. (Author)

  13. Environmental impacts of coal and nuclear power plants

    International Nuclear Information System (INIS)

    Carvalho, W.B.D. de; Souza, J.A.M. de

    1981-01-01

    The present work analyses the environmental impacts of coal and nuclear power plants. A comparison is made on a common basis considering the various activities involving the complete fuel cycle for both cases. (Author) [pt

  14. Integrated planning: A baseline development perspective

    International Nuclear Information System (INIS)

    Clauss, L.; Chang, D.

    1994-01-01

    The FEMP Baseline establishes the basis for integrating environmental activity technical requirements with their cost and schedule elements. The result is a path forward to successfully achieving the FERMCO mission. Specific to cost management, the FEMP Baseline has been incorporate into the FERMCO Project Control System (PCS) to provide a time-phased budget plan against which contractor performance is measured with an earned value management system. The result is the Performance Measurement Baseline (PMB), an important tool for keeping cost under control

  15. Assessment of the economic impact of environmental constraints on short-term hydropower plant operation

    International Nuclear Information System (INIS)

    Perez-Diaz, Juan I.; Wilhelmi, Jose R.

    2010-01-01

    Environmental constraints imposed on hydropower plant operation are usually given in the form of minimum environmental flows and, in some cases, in the form of maximum and minimum rates of change of flows, or ramping rates. Environmental constraints reduce the amount of water available to produce electricity and limit the contribution of peak hydropower plants to adapting the power supply to the demand and to providing certain ancillary services to the electrical grid, such as spinning reserve or load-frequency control. The objective of this paper is to assess the economic impact of environmental constraints on short-term hydropower plant operation. For that purpose, a revenue-driven daily optimization model based on mixed integer linear programming is used. The model considers the head variation and its influence on the units' efficiency, as well as the option of starting-up or shutting-down the plant at any hour of the day, should it be advantageous, while releasing the environmental flow through the bottom outlets. In order to illustrate the applicability of the methodology, it is applied in a real hydropower plant under different operating conditions and environmental constraints. (author)

  16. Assessment of the economic impact of environmental constraints on short-term hydropower plant operation

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Diaz, Juan I.; Wilhelmi, Jose R. [Department of Hydraulic and Energy Engineering, Technical University of Madrid (UPM), c/Profesor Aranguren s/n, 28040 Madrid (Spain)

    2010-12-15

    Environmental constraints imposed on hydropower plant operation are usually given in the form of minimum environmental flows and, in some cases, in the form of maximum and minimum rates of change of flows, or ramping rates. Environmental constraints reduce the amount of water available to produce electricity and limit the contribution of peak hydropower plants to adapting the power supply to the demand and to providing certain ancillary services to the electrical grid, such as spinning reserve or load-frequency control. The objective of this paper is to assess the economic impact of environmental constraints on short-term hydropower plant operation. For that purpose, a revenue-driven daily optimization model based on mixed integer linear programming is used. The model considers the head variation and its influence on the units' efficiency, as well as the option of starting-up or shutting-down the plant at any hour of the day, should it be advantageous, while releasing the environmental flow through the bottom outlets. In order to illustrate the applicability of the methodology, it is applied in a real hydropower plant under different operating conditions and environmental constraints. (author)

  17. Baseline scenarios of global environmental change

    International Nuclear Information System (INIS)

    Alcamo, J.; Kreileman, G.J.J.; Bollen, J.C.; Born, G.J. van den; Krol, M.S.; Toet, A.M.C.; Vries, H.J.M. de; Gerlagh, R.

    1996-01-01

    This paper presents three baseline scenarios of no policy action computed by the IMAGE2 model. These scenarios cover a wide range of coupled global change indicators, including: energy demand and consumption; food demand, consumption, and production; changes in land cover including changes in extent of agricultural land and forest; emissions of greenhouse gases and ozone precursors; and climate change and its impacts on sea level rise, crop productivity and natural vegetation. Scenario information is available for the entire world with regional and grid scale detail, and covers from 1970 to 2100. (author)

  18. Integration of energy and environmental systems in wastewater treatment plants

    Energy Technology Data Exchange (ETDEWEB)

    Long, Suzanna [Department of Engineering Management and Systems Engineering, 600 W, 14th Street, 215 EMGT Building, Rolla, MO-65401, 573-341-7621 (United States); Cudney, Elizabeth [Department of Engineering Management and Systems Engineering, 600 W, 14th Street, 217 EMGT Building, Rolla, MO-65401, 573-341-7931 (United States)

    2012-07-01

    Most wastewater treatment facilities were built when energy costs were not a concern; however, increasing energy demand, changing climatic conditions, and constrained energy supplies have resulted in the need to apply more energy-conscious choices in the maintenance or upgrade of existing wastewater treatment facilities. This research develops an integrated energy and environmental management systems model that creates a holistic view of both approaches and maps linkages capable of meeting high-performing energy management while meeting environmental standards. The model has been validated through a case study on the Rolla, Missouri Southeast Wastewater Treatment Plant. Results from plant performance data provide guidance to improve operational techniques. The significant factors contributing to both energy and environmental systems are identified and balanced against considerations of cost.

  19. The Green Dialysis Survey: Establishing a Baseline for Environmental Sustainability across Dialysis Facilities in Victoria, Australia.

    Science.gov (United States)

    Barraclough, Katherine A; Gleeson, Alice; Holt, Stephen G; Agar, John Wm

    2017-11-02

    The Green Dialysis Survey aimed to 1) establish a baseline for environmental sustainability (ES) across Victorian dialysis facilities, and 2) guide future initiatives to reduce the environmental impact of dialysis delivery. Nurse unit managers of all Victorian public dialysis facilities received an online link to the survey, which asked 107 questions relevant to the ES of dialysis services. Responses were received from 71/83 dialysis facilities in Victoria (86%), representing 628/660 dialysis chairs (95%). Low energy lighting was present in 13 facilities (18%), 18 (25%) recycled reverse osmosis water and 7 (10%) reported use of renewable energy. Fifty-six facilities (79%) performed comingled recycling but only 27 (38%) recycled polyvinyl chloride plastic. A minority educated staff in appropriate waste management (n=30;42%) or formally audited waste generation and segregation (n=19;27%). Forty-four (62%) provided secure bicycle parking but only 33 (46%) provided shower and changing facilities. There was limited use of tele- or video-conferencing to replace staff meetings (n=19;27%) or patient clinic visits (n=13;18%). A minority considered ES in procurement decisions (n=28;39%) and there was minimal preparedness to cope with climate change. Only 39 services (49%) confirmed an ES policy and few had ever formed a green group (n=14; 20%) or were currently undertaking a green project (n=8;11%). Only 15 facilities (21%) made formal efforts to raise awareness of ES. This survey provides a baseline for practices that potentially impact the environmental sustainability of dialysis units in Victoria, Australia. It also identifies achievable targets for attention. This article is protected by copyright. All rights reserved.

  20. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    International Nuclear Information System (INIS)

    1995-09-01

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: sm-bullet Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) sm-bullet Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as open-quotes lowclose quotes hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with open-quotes moderateclose quotes or open-quotes highclose quotes hazard classifications

  1. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: {sm_bullet} Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) {sm_bullet} Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as {open_quotes}low{close_quotes} hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with {open_quotes}moderate{close_quotes} or {open_quotes}high{close_quotes} hazard classifications.

  2. The scope of environmental impact statements for biofuelled energy plants in Sweden and its environmental relevance

    Energy Technology Data Exchange (ETDEWEB)

    Bruhn-Tysk, S.

    2001-03-01

    This thesis aims to evaluate how the Swedish environmental impact assessment (EIA) system works in practice and to analyse the environmental relevance of the scoping process during the ElA process. As a case study, environmental impact statements (EISs) for bio fuelled energy plants have been reviewed in order to illustrate the scope of the statements and hence evaluate how the ElA system works and analyses what environmental aspects that are prioritised by ElA actors. Based on the review results, the scope of the EISs indicates that the Swedish ElA system did not work as intended during the studied period since not even the legal requirements were fulfilled in many of the EISs. In addition, international EIA practice does not seem to have influenced the Swedish practice of ElA at that time. The EISs also show that EIA actors apply narrow system boundaries, i.e. they focus only on the activities of the energy plant that are explicitly linked to the energy plant location and its immediate vicinity. Moreover, these narrow system boundaries exclude important aspects of an energy plant, like resource extraction and global and long-term effects. Many of the energy plants have been planned and developed partly due to a Government Bill, in which a development of the Swedish energy system was proposed in order to achieve a sustainable development of Sweden. However, a sustainable development requires that effects on present as well as future generations are focused on as well. Therefore, an ElA process and a decision-making process, which prioritises local and short-term effects, often do not promote the societal goals of sustainable development. In order to promote the goals of sustainable development, the perspectives of ElA actors have to widen to include global and future, long-term effects.

  3. Environmental restoration activities at the US Department of Energy's Pinellas Plant

    International Nuclear Information System (INIS)

    Parker, M.W.

    1991-01-01

    The Pinellas Plant, located in Largo, Florida, is part of the US Department of Energy's (DOE) weapons complex. GE Neutron Devices (GEND) has initiated an extremely aggressive, proactive Environmental Restoration (ER) Program at the Pinellas Plant. The ER program was started by AL to investigate environmental concerns associated with past waste management practices and procedures at DOE weapons installations. The Pinellas Plant has been involved with ER activities since the mid 1980's when the DOE's Pinellas Area Office (PAO) entered a voluntary cleanup agreement with the Florida Department of Environmental Regulation (FDER). The agreement was for the remediation of an adjacent parcel of property previously owned, and used for disposal of drums containing waste solvents and resins. Remediation issues at the Pinellas Plant are equivalent to those experienced by many private industries; for example, limited volatile organic compound (VOC) and heavy metal contamination of the surficial aquifer system and heavy metal contamination of soils. ER activities in progress are aimed toward: confining, repositioning and remedying areas of heavy metal and VOC contaminants found within the surficial aquifer system; consistency with EPA's draft Corrective Action rules which state ''the corrective action program will be to expedite cleanup results by requiring (taking) sensible early action to control environmental problems;'' protection of a US Department of Interior (DOI) designated national wetland; and to ensure that risk to human health and safety and to the environment posed by the plants past, present and future operations are either eliminated or reduced to acceptable, safe levels. This paper will summarize the progress made and the strategies of the Pinellas Plant ER program as well as implementation of interim remedial actions

  4. Environmental Impacts of Plant-Based Diets: How Does Organic Food Consumption Contribute to Environmental Sustainability?

    Directory of Open Access Journals (Sweden)

    Camille Lacour

    2018-02-01

    Full Text Available BackgroundStudies investigating diet-related environmental impacts have rarely considered the production method of the foods consumed. The objective of the present study, based on the NutriNet-Santé cohort, was to investigate the relationship between a provegetarian score and diet-related environmental impacts. We also evaluated potential effect modifications on the association between a provegetarian score and the environmental impacts of organic food consumption.MethodsFood intake and organic food consumption ratios were obtained from 34,442 French adults using a food frequency questionnaire, which included information on organic food consumption for each group. To characterize the overall structure of the diets, a provegetarian score was used to identify preferences for plant-based products as opposed to animal-based products. Moreover, three environmental indicators were used to assess diet-related environmental impacts: greenhouse gas (GHG emissions, cumulative energy demand (CED, and land occupation. Environmental impacts were assessed using production life cycle assessment (LCA at the farm level. Associations between provegetarian score quintiles, the level of organic food consumption, and environmental indicators were analyzed using ANCOVAs adjusted for energy, sex, and age.ResultsParticipants with diets rich in plant-based foods (fifth quintile were more likely to be older urban dwellers, to hold a higher degree in education, and to be characterized by an overall healthier lifestyle and diet. A higher provegetarian score was associated with lower environmental impacts (GHG emissionsQ5vsQ1 = 838/1,664 kg CO2eq/year, −49.6%, P < 0.0001; CEDQ5vsQ1 = 4,853/6,775 MJ/year, −26.9%, P < 0.0001; land occupationQ5vsQ1 = 2,420/4,138 m2/year, −41.5%, P < 0.0001. Organic food consumption was also an important modulator of the relationship between provegetarian dietary patterns and environmental impacts but only

  5. Uranium Fuel Plant. Applicants environmental report

    International Nuclear Information System (INIS)

    1975-05-01

    The Uranium Fuel Plant, located at the Cimarron Facility, was constructed in 1964 with operations commencing in 1965 in accordance with License No. SNM-928, Docket No. 70-925. The plant has been in continuous operation since the issuance of the initial license and currently possesses contracts extending through 1978, for the production of nuclear fuels. The Uranium Plant is operated in conjunction with the Plutonium Facility, each sharing common utilities and sanitary wastes disposal systems. The operation has had little or no detrimental ecological impact on the area. For the operation of the Uranium Fuel Fabrication Plant, initial equipment provided for the production of UO 2 , UF 4 , uranium metal and recovery of scrap materials. In 1968, the plant was expanded by increasing the UO 2 and pellet facilities by the installation of another complete production line for the production of fuel pellets. In 1969, fabrication facilities were added for the production of fuel elements. Equipment initially installed for the recovery of fully enriched scrap has not been used since the last work was done in 1970. Economically, the plant has benefited the Logan County area, with approximately 104 new jobs with an annual payroll of approximately $1.3 million. In addition, $142,000 is annually paid in taxes to state, local and federal governments, and local purchases amount to approximately $1.3 million. This was all in land that was previously used for pasture land, with a maximum value of approximately 37,000 dollars. Environmental effects of plant operation have been minimal. A monitoring and measurement program is maintained in order to ensure that the ecology of the immediate area is not affected by plant operations

  6. Recognition of the Environmental Costs of Fossil Fuel Plants

    Directory of Open Access Journals (Sweden)

    Hakkı FINDIK

    2015-12-01

    Full Text Available Environment that is the natural residential area of live life is among the interests of the various sciences. Within the scope of accounting science, the concept of social awareness requires a social responsibility based approach and this causes some additional environmental costs emerged when interaction of business with their environment considered. In the Uniform Accounting Plan there exists a special account relating with monitoring, controlling and managing of environmental costs. This study deals with environmental accounting for enterprises and introduces determination and recognition of the environmental costs of fossil fuel plants that use coal as a fuel

  7. Plant resistance to cold stress: Mechanisms and environmental ...

    Indian Academy of Sciences (India)

    Unknown

    Cold acclimation of plants; environmental signals; frost hardening; photoperiod; phytochrome; Scots pine http://www.ias.ac.in/jbiosci .... radical scavenging potential of the cells (Tao et al 1998; ...... tion in cell–free extracts; FEBS Lett. 410 206– ...

  8. Environmental and community controls on plant canopy chemistry in a Mediterranean-type ecosystem.

    Science.gov (United States)

    Dahlin, Kyla M; Asner, Gregory P; Field, Christopher B

    2013-04-23

    Understanding how and why plant communities vary across space has long been a goal of ecology, yet parsing the relative importance of different influences has remained a challenge. Species-specific models are not generalizable, whereas broad plant functional type models lack important detail. Here we consider plant trait patterns at the local scale and ask whether plant chemical traits are more closely linked to environmental gradients or to changes in species composition. We used the visible-to-shortwave infrared (VSWIR) spectrometer of the Carnegie Airborne Observatory to develop maps of four plant chemical traits--leaf nitrogen per mass, leaf carbon per mass, leaf water concentration, and canopy water content--across a diverse Mediterranean-type ecosystem (Jasper Ridge Biological Preserve, CA). For all four traits, plant community alone was the strongest predictor of trait variation (explaining 46-61% of the heterogeneity), whereas environmental gradients accounted for just one fourth of the variation in the traits. This result emphasizes the critical role that species composition plays in mediating nutrient and carbon cycling within and among different communities. Environmental filtering and limits to similarity can act strongly, simultaneously, in a spatially heterogeneous environment, but the local-scale environmental gradients alone cannot account for the variation across this landscape.

  9. Portsmouth Gasseous Diffusion Plant site, Piketon, Ohio. Final environmental impact statement. Volume 1

    International Nuclear Information System (INIS)

    1977-05-01

    This environmental statement provides a detailed analysis of the environmental effects associated with continued operation of the Portsmouth Gaseous Diffusion Plant, one of the three government-owned uranium enrichment plants operated by the Energy Research and Development Administration (ERDA). The Portsmouth facility, which has been operating for over twenty years, is located in Pike County, Ohio, on a 4000-acre federally owned reservation. The uranium enrichment capacity of the plant is currently being increased through a cascade improvement program (CIP) and a cascade uprating program (CUP). This environmental statement evaluates the Portsmouth facility at the fully uprated CUP production level. Environmental impacts of the production of offsite electric power for the Portsmouth facility are also assessed. The bulk of this power is supplied by the Ohio Valley Electric Corporation (OVEC) from two coal-fired plants, the Clifty Creek Power Plant near Madison, Indiana, and the Kyger Creek Power Plant near Cheshire, Ohio. The remaining required power will be obtained on a system basis through OVEC from the 15 sponsoring utilities of OVEC. The draft statement was issued for public comment on February 15, 1977, and public hearing to afford the public further opportunity to comment was held in Cincinnati, Ohio, on April 5, 1977

  10. 75 FR 18572 - Supplemental Environmental Impact Statement for Sequoyah Nuclear Plant Units 1 and 2 License...

    Science.gov (United States)

    2010-04-12

    ... TENNESSEE VALLEY AUTHORITY Supplemental Environmental Impact Statement for Sequoyah Nuclear Plant... National Environmental Policy Act. TVA will prepare a supplemental environmental impact statement (SEIS) to update information in the 1974 Final Environmental Statement for Sequoyah Nuclear Plant Units 1 and 2...

  11. Environmental Baseline Survey Report for the Title Transfer of Land Parcel ED-4 at the East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    SAIC

    2008-05-01

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of a land parcel referred to as 'ED-4' (ED-4) at the U. S. Department of Energy's (DOE's) East Tennessee Technology Park (ETTP). DOE is proposing to transfer the title of this land to the Heritage Center, LLC. Parcel ED-4 is a land parcel that consists of two noncontiguous areas comprising a total of approximately 18 acres located east of the ETTP. The western tract of ED-4 encompasses approximately 8.5 acres in the northeastern quadrant of the intersection of Boulevard Road and Highway 58. The eastern tract encompasses an area of approximately 9.5 acres in the northwestern quadrant of the intersection of Blair Road and Highway 58 (the Oak Ridge Turnpike). Aerial photographs and site maps from throughout the history of the ETTP, going back to its initial development in the 1940s as the Oak Ridge Gaseous Diffusion Plant (ORGDP), indicate that this area has been undeveloped woodland with the exception of three support facilities for workers constructing the ORGDP since federal acquisition in 1943. These three support facilities, which were located in the western tract of ED-4, included a recreation hall, the Town Hall Camp Operations Building, and the Property Warehouse. A railroad spur also formerly occupied a portion of Parcel ED-4. These former facilities only occupied approximately 5 percent of the total area of Parcel ED-4. This report provides supporting information for the transfer of this government-owned property at ETTP to a non-federal entity. This EBS is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). In order to support a Clean Parcel Determination (CPD) in accordance with CERCLA Sect. 120(h)(4)(d), groundwater and sediment samples were collected within, and adjacent to, the Parcel ED-4 study area. The potential for DOE to make a CPD for ED-4 is

  12. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 1. Draft environmental statement

    Energy Technology Data Exchange (ETDEWEB)

    1976-06-01

    Subject to authorizing legislation and funding, ERDA will proceed with steps for additional uranium enrichment capacity at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio. This environmental statement was prepared by ERDA to cover this action. The statement was prepared in accordance with the National Environmental Policy Act of 1969, and ERDA's implementing regulations, 10 CFR Chapter III, Part 711. The statement describes the reasonably foreseeable environmental, social, economic and technological costs and benefits of the construction and operation of the expanded enrichment plant and its reasonably available alternatives and their anticipated effects.

  13. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 1. Draft environmental statement

    International Nuclear Information System (INIS)

    1976-06-01

    Subject to authorizing legislation and funding, ERDA will proceed with steps for additional uranium enrichment capacity at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio. This environmental statement was prepared by ERDA to cover this action. The statement was prepared in accordance with the National Environmental Policy Act of 1969, and ERDA's implementing regulations, 10 CFR Chapter III, Part 711. The statement describes the reasonably foreseeable environmental, social, economic and technological costs and benefits of the construction and operation of the expanded enrichment plant and its reasonably available alternatives and their anticipated effects

  14. Plant trait-species abundance relationships vary with environmental properties in subtropical forests in eastern china.

    Directory of Open Access Journals (Sweden)

    En-Rong Yan

    Full Text Available Understanding how plant trait-species abundance relationships change with a range of single and multivariate environmental properties is crucial for explaining species abundance and rarity. In this study, the abundance of 94 woody plant species was examined and related to 15 plant leaf and wood traits at both local and landscape scales involving 31 plots in subtropical forests in eastern China. Further, plant trait-species abundance relationships were related to a range of single and multivariate (PCA axes environmental properties such as air humidity, soil moisture content, soil temperature, soil pH, and soil organic matter, nitrogen (N and phosphorus (P contents. At the landscape scale, plant maximum height, and twig and stem wood densities were positively correlated, whereas mean leaf area (MLA, leaf N concentration (LN, and total leaf area per twig size (TLA were negatively correlated with species abundance. At the plot scale, plant maximum height, leaf and twig dry matter contents, twig and stem wood densities were positively correlated, but MLA, specific leaf area, LN, leaf P concentration and TLA were negatively correlated with species abundance. Plant trait-species abundance relationships shifted over the range of seven single environmental properties and along multivariate environmental axes in a similar way. In conclusion, strong relationships between plant traits and species abundance existed among and within communities. Significant shifts in plant trait-species abundance relationships in a range of environmental properties suggest strong environmental filtering processes that influence species abundance and rarity in the studied subtropical forests.

  15. Waste Isolation Pilot Plant Annual Site Environmental Report for 2014. Emended

    International Nuclear Information System (INIS)

    2015-01-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2014 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year (CY); Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE environmental sustainability goals made through implementation of the WIPP Environmental Management System (EMS).

  16. Waste Isolation Pilot Plant Annual Site Environmental Report for 2014. Emended

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2014 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year (CY); Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE environmental sustainability goals made through implementation of the WIPP Environmental Management System (EMS).

  17. Annual radiological environmental operating report: Sequoyah Nuclear Plant, 1987

    International Nuclear Information System (INIS)

    1988-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of the Sequoyah Nuclear Plant in 1987. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. 2 figs., 2 tabs

  18. 78 FR 37281 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses

    Science.gov (United States)

    2013-06-20

    ... factors: (1) License renewal will involve nuclear power plants for which the environmental impacts of...) Changes in the environment around nuclear power plants are gradual and predictable. The 1996 GEIS improved... environmental impacts that may occur from renewing commercial nuclear power plant operating licenses; (2...

  19. Paducah Gaseous Diffusion Plant Annual Site Environmental Report summary for 1993

    International Nuclear Information System (INIS)

    1994-11-01

    This report contains summaries of the environmental programs at Paducah Gaseous Diffusion Plant, environmental monitoring and the results, and the impact of operations on the environment and the public for 1993. The environmental monitoring program at Paducah includes effluent monitoring and environmental surveillance. Effluent monitoring is measurement of releases as they occur. Contaminants are released through either airborne emissions or liquids discharged from the plant. These releases occur as part of normal site operations, such as cooling water discharged from the uranium enrichment cascade operations or airborne releases from ventilation systems. In the event of system failure, this monitoring provides timely warning so that corrective action can be taken before releases reach an unsafe level. Environmental surveillance tracks the dispersion of materials into the environment after they have been released. This involves the collection of samples from various media, such as water, soil, vegetation, and food crops, and the analysis of these samples for certain radionuclides, chemicals, and metals

  20. Portsmouth Gaseous Diffusion Plant Annual Site Environmental Report summary for 1993

    International Nuclear Information System (INIS)

    1994-11-01

    This report contains summaries of the environmental programs at Paducah Gaseous Diffusion Plant, environmental monitoring and the results, and the impact of operations on the environment and the public for 1993. The environmental monitoring program at Paducah includes effluent monitoring and environmental surveillance. Effluent monitoring is measurement of releases as they occur. Contaminants are released through either airborne emissions or liquids discharged from the plant. These releases occur as part of normal site operations, such as cooling water discharged from the uranium enrichment cascade operations or airborne releases from ventilation systems. In the event of system failure, this monitoring provides timely warning so that corrective action can be taken before releases reach an unsafe level. Environmental surveillance tracks the dispersion of materials into the environment after they have been released. This involves the collection of samples from various media, such as water, soil, vegetation, and food crops, and the analysis of these samples for certain radionuclides, chemicals, and metals

  1. Environmental Assessment for decontamination and dismantlement, Pinellas Plant

    International Nuclear Information System (INIS)

    1995-06-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-1092) of the proposed decontamination and dismantlement of the Pinellas Plant in Largo, Florida. Under the Decontamination and Dismantlement EA, the DOE proposes to clean up facilities, structures, and utilities; dismantle specific structures; and mitigate or eliminate any environmental impacts associated with the cleanup, dismantlement, and related activities. Related activities include utilization of specific areas by new tenants prior to full-scale cleanup. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969. Therefore, the preparation of an environmental impact statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  2. Environmental quality rehabilitation relating to the cessation of a thermal plant

    International Nuclear Information System (INIS)

    Pauna, Gheorghe; Budulan, Pompiliu; Pavel, Adina Mariana

    2004-01-01

    The paper describes the environmental requirements as a result of the IANCA Thermal Plant running on coal, taking out of operation and turning it to better account by selling or dismantling it. Thus, in agreement with the Environmental Protection Law No. 137/29.12.1995- modified and republished on 17.02.2000//Article 15 specifies that when the investment changes its owner or destination or the activities generating an impact on the environment cease to exist, it is mandatory that the former owner develop an environmental study, with a view to establishing the requirements obligations relating to environmental quality restoration in the area the respective activity had an impact on. In the paper will be presented the following issues: environmental obligations resulting from the objective putting out of operation. Legislative specifications; specific works and environmental protection measures: installation, equipment, sub assemblies, spare parts turning to better account; general conditions (prerequisites) for waste management,, categories of waste resulting from the IANCA Thermal Plant dismantling. Its storage and turning to better account. (Author)

  3. Reconstruction of baseline time-trace under changing environmental and operational conditions

    International Nuclear Information System (INIS)

    Aryan, P; Kotousov, A; Ng, C T; Wildy, S

    2016-01-01

    Compensation of changing environmental and operational conditions (EOC) is often necessary when using guided-wave based techniques for structural health monitoring in real-world applications. Many studies have demonstrated that the effect of changing EOC can mask damage to a degree that a critical defect might not be detected. Several effective strategies, specifically for compensating the temperature variations, have been developed in recent years. However, many other factors, such as changing humidity and boundary conditions or degradation of material properties, have not received much attention. This paper describes a practical method for reconstruction of the baseline time-trace corresponding to the current EOC. Thus, there is no need for differentiation or compensation procedures when using this method for damage diagnosis. It is based on 3D surface measurements of the velocity field near the actuator using laser vibrometry, in conjunction with high-fidelity finite element simulations of guided wave propagation in free from defects structure. To demonstrate the feasibility and efficiency of the proposed method we provide several examples of the reconstruction and damage detection. (paper)

  4. Reconstruction of baseline time-trace under changing environmental and operational conditions

    Science.gov (United States)

    Aryan, P.; Kotousov, A.; Ng, C. T.; Wildy, S.

    2016-03-01

    Compensation of changing environmental and operational conditions (EOC) is often necessary when using guided-wave based techniques for structural health monitoring in real-world applications. Many studies have demonstrated that the effect of changing EOC can mask damage to a degree that a critical defect might not be detected. Several effective strategies, specifically for compensating the temperature variations, have been developed in recent years. However, many other factors, such as changing humidity and boundary conditions or degradation of material properties, have not received much attention. This paper describes a practical method for reconstruction of the baseline time-trace corresponding to the current EOC. Thus, there is no need for differentiation or compensation procedures when using this method for damage diagnosis. It is based on 3D surface measurements of the velocity field near the actuator using laser vibrometry, in conjunction with high-fidelity finite element simulations of guided wave propagation in free from defects structure. To demonstrate the feasibility and efficiency of the proposed method we provide several examples of the reconstruction and damage detection.

  5. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  6. The subject deserving wide attention for nuclear power plant siting and environmental impact assessment

    International Nuclear Information System (INIS)

    Li Yong; Li Wenhui; Zhang Lingyan

    2009-01-01

    Based on siting work of nuclear power plant, the characteristics of nuclear power plant site selection and environmental impact assessment are analysed in accordance with laws and regulations of nuclear safety and environmental protection. Some subjects deserving attentions are put forward. (authors)

  7. Environmental behavior of technetium-99

    International Nuclear Information System (INIS)

    Turcotte, M.D.S.

    1982-12-01

    This report presents a review of the literature on technetium-99. The chemical and physical properties of some technetium compounds are considered, and a discussion of possible source terms is included. Literature on the environmental behavior of technetium is presented, including its behavior in the bodies of animals and humans. The primary sources of Tc-99 in the environment are fallout from atomic detonations and releases from nuclear fuel reprocessing plants. The environmental behavior of technetium-99 has been studied predominantly with respect to movement in soil and accumulation in plants. There is a surprising scarcity of data on behavior of Tc-99 in the atmosphere and in aquatic systems. Additional work needs to be conducted in these two areas to determine behavior and to acquire baseline concentration data. Much of the soil work has produced contradictory results. In-depth studies of holdup mechanisms for Tc-99 in both geological repositories and soil need to be conducted. Since plants represent a potential bioaccumulation of Tc-99, plant uptake studies of Tc-99 under field conditions also need to be done

  8. Use of reconnaissance level information for environmental assessment

    International Nuclear Information System (INIS)

    Foster, R.F.; Rickard, W.H.; Strand, J.A.; Warner, M.L.

    1979-11-01

    Reconnaissance level information (RLI) sufficient for comparing the environmental and socio-economic features of candidate sites for nuclear power stations and for guiding plant design, baseline surveys, and operational practices is usually available from published reports, public records, and knowledgeable individuals. Environmental concerns of special importance for site evaluation include: aquatic ecology, terrestrial ecology, land and water use, socio-economics, and institutional constraints. A scheme is suggested for using RLI to assign classifications to candidate sites based on the potential level of concern associated with the different environmental features

  9. Waste processing plant eco-auditing system for minimization of environmental risk: European Communities regulatory proposal

    International Nuclear Information System (INIS)

    Brunetti, N.

    1993-01-01

    This paper delineates a system of process control and monitoring checks to be applied to municipal-industrial waste processing and disposal plants to ensure their energy efficient, environmentally safe and reliable operation. In line with European Communities environmental protection strategies, this eco-auditing system requires the preparation of environmental impacts statements on a regular basis during plant operation, as well as, prior to plant start-up. Continuous plant environmental compatibility evaluations are to ascertain: material and energy inputs and outputs; the composition and amounts of exhaust gases released into the atmosphere and the integrity of treatment liquids; control and monitoring instrumentation reliability. The implementation of the auditing system is to be carried out under the supervision of authorized auditing personnel. Waste processing and disposal plants are to make maximum use of energy and materials recovery processes so as to minimize energy consumption and risk to the environment

  10. Plants and their microbial assistants: Nature's answer to Earth's environmental pollution problems

    Science.gov (United States)

    Wolverton, B. C.

    1990-01-01

    The utilization of higher plants and their associated microorganisms to solve environmental pollution problems on Earth and in future space applications is briefly reviewed. If man is sealed inside closed facilities, he becomes a polluter of the environment. It is also common knowledge to most people that man cannot survive on Earth without green photosynthesizing plants and microorganisms. Therefore, it is vitally important to have a better understanding of the interactions of man with plants and microorganisms. Biosphere 2 and other related studies presently being conducted or planned, hopefully, will supply data that will help save planet Earth from impending environmental disaster. The development of means to utilize both air and water pollution as a nutrient source for growing green plants is examined.

  11. Validity and design of environmental surveillance systems for operating nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Eichholz, G.G.

    1977-12-01

    The composition and procedures of environmental surveillance programs at completed and operating nuclear power plants have been examined with respect to their validity, continuing significance and cost. It was found that many programs contain components that are mainly an extension of preoperational baseline measurements that need not be continued indefinitely and that others lack the statistical validity to make their continued application meaningful. To identify the practical limits imposed by counting statistics and realistic equipment capacity measurements were done on iodine-131 and cesium-137 containing samples to establish detectability limits and proportionate costs for sample preparation and counting. It was found that under commercial conditions effective detectability limits and expected confidence limits were substantially higher than those mentioned in NRC Regulatory Guides. This imposes a need for either selecting fewer samples and counting them for longer times or accepting a lesser accuracy on more samples, within the bounds of reasonable cost per sample

  12. Environmental radioactivity survey in Andong

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Zi Hong; Jo, Kum Ju [Andong Regional Radioactivity Monitoring Station, Andong National Univ., Andong (Korea, Republic of)

    2002-12-15

    The objectives of the project are to monitor an abnormal level in Andong area and to provide a base-line data on environmental radiation/radioactivity levels in case of any radiological emergency situation. The project is important in view of protecting the public health from the potential hazards of radiation and keeping up the clean environment. This report summarizes and interprets environmental radiation/radioactivity monitoring samples Gamma exposure rates, airborne dust, precipitation, fall-out and drinking-water. Environmental samples 2 kinds of indicator plant, 4 kinds of mushroom, 7 kinds of nut and seeds, and drinking waters. Among the all 2002 radiological monitoring and environmental data in Andong area were not found the extraordinary data. And a nation-wide environmental radiation/radioactivity level survey results were all background levels attributed to terrestrial and cosmic radiation.

  13. Impact of power uprate on environmental qualification of equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Raheja, R.D.; Mohiuddin, A.; Alsammarae, A.

    1996-01-01

    Many nuclear power facilities are finding it economically beneficial to increase reactor output, from operating plants, by resorting to power uprates. A power uprate implies that a utility can increase the reactor output, or the megawatts generated, by increasing steam pressure without adding or changing any plant systems. This is perhaps one of the least expensive options for increasing the generating capacity of a power plant. However, a nuclear plant requires a comprehensive review of the plant systems, structures and components to assure their capability to withstand the resulting increased normal and accident plant conditions. A power uprate will typically result in a plant operating at higher than the originally designed environmental conditions. Safety related equipment in nuclear plants is presently qualified to the UFSAR Chapter 15 accident events and the resulting temperatures, pressures, radiation levels etc. These values will increase when the reactor is producing a higher MWe output. Components that are sensitive to the environment must be re-evaluated and assessed to determine their acceptability and operability under the revised environmental conditions. Most safety-related mechanical and electrical equipment will require an assessment from an environmental qualification standpoint. Utilities must perform this task in a systematic, auditable and cost effective manner to optimize their resources and minimize plant costs associated with modifications, replacements or equipment testing. This paper discusses various approaches and provides recommendations to achieve equipment qualification while satisfying the plant's objective of a power uprate

  14. Environmental monitoring report for Plantex Plant covering 1979

    International Nuclear Information System (INIS)

    Alexander, R.E.; Cornelius, V.A.

    1980-05-01

    The environmental monitoring program at Pantex Plant for 1979 is summarized. Monitoring data for both radioactive and non-radioactive species in the local environment are presented. Although plant activities involve the handling of significant quantities of uranium, plutonium, and tritium, only small releases of uranium (depleted in the isotope 235 U) and tritium occurred which could have affected the local environment. Monitoring data indicate that concentrations of these nuclides in the environment are below established criteria for air and water and therefore do not present a health hazard either to employees or to the public

  15. Results and experiences from environmental monitoring at Rheinsberg nuclear power plant

    International Nuclear Information System (INIS)

    Ettenhuber, E.; Loennig, M.; Hoffmann, M.L.; Roehnsch, W.; Babenzien, C.; Lehmann, R.; Schreiter, W.D.

    1975-12-01

    The paper presents the routine monitoring program at the Rheinsberg nuclear power plant including the methods applied therein. On the basis of data gathered during 1966 to 1973 it is shown, that the impact of nuclear power plant operation on the radioactivity level of the examined environmental media was exceedingly small compared to that of global fallout. Therefore only by means of a system based on assessment of radiation exposure from effluent data and environmental surveillance is it possible to prove the observance of maximum permissible values to individual members of the public. (author)

  16. Paducah Gaseous Diffusion Plant environmental report for 1989

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. (ed.) (Martin Marietta Energy Systems, Inc., Oak Ridge, TN (USA))

    1990-10-01

    This two-part environmental report is published annually. It reflects the results of a comprehensive, year-round program to monitor the impact of operations at Paducah Gaseous Diffusion Plant (PGDP) on the area's groundwater and surface waters, soil, air quality, vegetation, and wildlife. In addition, an assessment of the effect of PGDP effluents on the resident human population is made. PGDP's overall goal for environmental management is to protect the environment and PGDP's neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, to reduce the formation of waste, and to minimize hazardous waste by substitution of materials. 36 refs.

  17. Plant species distribution along environmental gradient: do belowground interactions with fungi matter?

    Directory of Open Access Journals (Sweden)

    Loïc ePellissier

    2013-12-01

    Full Text Available The distribution of plants along environmental gradients is constrained by abiotic and biotic factors. Cumulative evidence attests of the impact of abiotic factors on plant distributions, but only few studies discuss the role of belowground communities. Soil fungi, in particular, are thought to play an important role in how plant species assemble locally into communities. We first review existing evidence, and then test the effect of the number of soil fungal operational taxonomic units (OTUs on plant species distributions using a recently collected dataset of plant and metagenomic information on soil fungi in the Western Swiss Alps. Using species distribution models, we investigated whether the distribution of individual plant species is correlated to the number of OTUs of two important soil fungal classes known to interact with plants: the Glomeromycetes, that are obligatory symbionts of plants, and the Agaricomycetes, that may be facultative plant symbionts, pathogens, or wood decayers. We show that including the fungal richness information in the models of plant species distributions improves predictive accuracy. Number of fungal OTUs is especially correlated to the distribution of high elevation plant species. We suggest that high elevation soil show greater variation in fungal assemblages that may in turn impact plant turnover among communities. We finally discuss how to move beyond correlative analyses, through the design of field experiments manipulating plant and fungal communities along environmental gradients.

  18. Portsmouth Gaseous Diffusion Plant expansion: final environmental statement. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1977-09-01

    Volume 1 is comprised of chapters on: background and description; environmental impacts of add-on gaseous diffusion plant; unavoidable adverse environmental effects; alternatives; relationship between short-term uses and long-term productivity; relationship of program to land-use plans, policies, and controls; irreversible and irretrievable commitments of resources; cost-benefit analysis; and response to comment letters. (LK)

  19. Portsmouth Gaseous Diffusion Plant expansion: final environmental statement. Volume 1

    International Nuclear Information System (INIS)

    1977-09-01

    Volume 1 is comprised of chapters on: background and description; environmental impacts of add-on gaseous diffusion plant; unavoidable adverse environmental effects; alternatives; relationship between short-term uses and long-term productivity; relationship of program to land-use plans, policies, and controls; irreversible and irretrievable commitments of resources; cost-benefit analysis; and response to comment letters

  20. Modernization of the WWER 440/230 nuclear power plant environmental protection system

    Energy Technology Data Exchange (ETDEWEB)

    Mikheev, N.V.; Kamenskaya, A.N.; Kulyukhin, S.A.; Novichenko, V.L.; Rumer, I.A. [Russian Academy of Sciences, Institute of Physical Chemistry, Moscow (Russian Federation); Antonov, B.V.; Kornienko, A.G.; Meshkov, V.M.; Rogov, M.F. [Rosenergoatom Concern, Moscow (Russian Federation)

    2001-07-01

    The papers reports a new approach to the problem of increasing environmental protection during severe accidents at WWER 440/230 nuclear power plants. The environmental protection system that we propose has three, not two protection levels, and can be introduced with minor modernization of the equipment available at WWER 440/230 nuclear power plants: 1. a jet-vortex condenser; 2. the sprinkler system; 3. a sorption module. The proposed modernization not only makes it possible to avoid emergency discharge of radioactive air and steam mix into the environment under any accident scenario, but also would substantially contribute to the safety of WWER 440/230 nuclear power plants. (author)

  1. The use of autecological and environmental parameters for establishing the status of lichen vegetation in a baseline study for a long-term monitoring survey

    International Nuclear Information System (INIS)

    Gombert, S.; Asta, J.; Seaward, M.R.D.

    2005-01-01

    In 1997 the ecological characteristics of the epiphytic species (83 lichens and two algae) of an urban area (Grenoble, France) were determined. Seven autecological indices were used to characterize the lichen ecology: illumination index, humidity index, pH of bark, nutrient status of substratum, ecological index of IAP and frequency. Six clusters (A1-A6) were defined using cluster analysis and principal component analysis. Seven environmental parameters characterizing the stations and the lichen releves were also used: elevation, parameters of artificiality (urbanization, traffic and local land use), IAP, and the percentage of nitrophytic and acidophytic species. Six clusters (B1-B6) were defined using cluster analysis and canonical correspondence analysis. Four clusters (C1-C4) were finally defined using an empirical integrated method combining the autecological and environmental parameters. This final clustering which established the status of the lichen vegetation in 1997 can be reliably used as a baseline study to effectively monitor environmental changes in this urban area. - Ecological clustering which establishes the status of lichen vegetation can be reliably used as a baseline study to monitor environmental changes

  2. Baseline Flowsheet Generation for the Treatment and Disposal of Idaho National Engineering and Environmental Laboratory Sodium Bearing Waste

    International Nuclear Information System (INIS)

    Barnes, C.M.; Lauerhass, L.; Olson, A.L.; Taylor, D.D.; Valentine, J.H.; Lockie, K.A.

    2002-01-01

    The High-Level Waste (HLW) Program at the Idaho National Engineering and Environmental Laboratory (INEEL) must implement technologies and processes to treat and qualify radioactive wastes located at the Idaho Nuclear Technology and Engineering Center (INTEC) for permanent disposal. This paper describes the approach and accomplishments to date for completing development of a baseline vitrification treatment flowsheet for sodium-bearing waste (SBW), including development of a relational database used to manage the associated process assumptions. A process baseline has been developed that includes process requirements, basis and assumptions, process flow diagrams, a process description, and a mass balance. In the absence of actual process or experimental results, mass and energy balance data for certain process steps are based on assumptions. Identification, documentation, validation, and overall management of the flowsheet assumptions are critical to ensuring an integrated, focused program. The INEEL HLW Program initially used a roadmapping methodology, developed through the INEEL Environmental Management Integration Program, to identify, document, and assess the uncertainty and risk associated with the SBW flowsheet process assumptions. However, the mass balance assumptions, process configuration and requirements should be accessible to all program participants. This need resulted in the creation of a relational database that provides formal documentation and tracking of the programmatic uncertainties related to the SBW flowsheet

  3. TCP Transcription Factors at the Interface between Environmental Challenges and the Plant's Growth Responses.

    Science.gov (United States)

    Danisman, Selahattin

    2016-01-01

    Plants are sessile and as such their reactions to environmental challenges differ from those of mobile organisms. Many adaptions involve growth responses and hence, growth regulation is one of the most crucial biological processes for plant survival and fitness. The plant-specific TEOSINTE BRANCHED 1, CYCLOIDEA, PCF1 (TCP) transcription factor family is involved in plant development from cradle to grave, i.e., from seed germination throughout vegetative development until the formation of flowers and fruits. TCP transcription factors have an evolutionary conserved role as regulators in a variety of plant species, including orchids, tomatoes, peas, poplar, cotton, rice and the model plant Arabidopsis. Early TCP research focused on the regulatory functions of TCPs in the development of diverse organs via the cell cycle. Later research uncovered that TCP transcription factors are not static developmental regulators but crucial growth regulators that translate diverse endogenous and environmental signals into growth responses best fitted to ensure plant fitness and health. I will recapitulate the research on TCPs in this review focusing on two topics: the discovery of TCPs and the elucidation of their evolutionarily conserved roles across the plant kingdom, and the variety of signals, both endogenous (circadian clock, plant hormones) and environmental (pathogens, light, nutrients), TCPs respond to in the course of their developmental roles.

  4. Environmental study of the Wairakei Power Plant. [Effects of hydroelectric power plant on ecology of Waikato River Basin, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Axtmann, R C

    1974-12-01

    Physical, chemical, biological, ecological, and aesthetic aspects of the Wairakei Power Plant are examined, in varying detail, but with primary emphasis on the chemical and thermal effluents. When flows are average or higher in the Waikato River, the Plant's environmental effects are not overly severe. However, operating requirements for the Waikato Hydro-electric System are such that the Plant sporadically produces wastes that may affect the human and natural environment adversely. These adverse effects are not presently too serious, but suggestions are made for improving the Plant's overall environmental performance. Although the point is not discussed in detail, it is clear from the results of the study that any additional thermal plants on the Waikato could strain the river's absorptive capacities severely, unless alternative disposal techniques are used for the various effluents.

  5. Environmental Quality and the U.S. Power Sector: Air Quality, Land Use and Environmental Justice

    Energy Technology Data Exchange (ETDEWEB)

    Massetti, Emanuele [Georgia Inst. of Technology, Atlanta, GA (United States); Brown, Marilyn Ann [Georgia Inst. of Technology, Atlanta, GA (United States); Lapsa, Melissa Voss [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sharma, Isha [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bradbury, James [U.S. Dept. of Energy, Washington, DC (United States); Cunliff, Colin [American Association for the Advancement of Science, Washington, DC (United States); Li, Yufei [Georgia Inst. of Technology, Atlanta, GA (United States)

    2017-01-04

    This baseline report summarizes key environmental quality issues associated with electricity generation, transmission, distribution, and end use in the United States. Its scope includes non-greenhouse gas air pollution (i.e., sulfur dioxide, nitrogen oxides, particulate matter and hazardous air pollutants), land use, water pollution, ecological impacts, human health, and environmental justice. The discussion characterizes both current impacts and recent trends, as well as assessments of key drivers of change. For example, the air emissions section includes a quantitative decomposition analysis of the drivers of change in sulfur dioxide emissions reductions from coal-fired power plants. The report is divided into four topical sections: air emissions, land use and ecology, water quality, and environmental justice.

  6. Environmental restoration activities at the U.S. Department of Energy's Pinellas Plant

    International Nuclear Information System (INIS)

    Parker, Michael W.

    1992-01-01

    The Pinellas Plant, located in Largo, Florida, is part of the U.S. Department of Energy's (DOE) weapons complex. GE Neutron Devices (GEND) has initiated an extremely aggressive, proactive Environmental Restoration (ER) Program at the Pinellas Plant. The ER program was started by AL to investigate environmental concerns associated with past waste management practices and procedures at DOE weapons installations. The Pinellas Plant has been involved with ER activities since the mid 1980's when the DOE's Pinellas Area Office (PAO) entered a voluntary cleanup agreement with the Florida Department of Environmental Regulation (FDER). The agreement was for the remediation of an adjacent parcel of property previously owned, and used for disposal of drums containing waste solvents and resins. The ER program at the Pinellas Plant has been progressing rapidly since this inception, with ER activities currently initiated and/or planned at all sites where contaminants have been detected above regulatory standards. These activities operate under the State of Florida's 'Corrective Actions For Ground Water Contamination Cases' guidance and the Environmental Protection Agency's (EPA) Resource Conservation and Recovery Act (RCRA), as amended by the Hazardous and Solid Waste Amendments (HSWA) Corrective Action Rule and the requirements specified in the Hazardous Waste Part B Permit. Remediation issues at the Pinellas Plant are equivalent to those experienced by many private industries; for example, limited volatile organic compound (VOC) and heavy metal contamination of the surficial aquifer system and heavy metal contamination of soils. ER activities in progress are aimed toward; confining, repositioning and remedying areas of heavy metal and VOC contaminants found within the surficial aquifer system; consistency with EPA's draft Corrective Action Rules which state 'the corrective action program will be to expedite cleanup results by requiring (taking) sensible early action to control

  7. Nuclear power plant system environmental design and decision methodology

    International Nuclear Information System (INIS)

    Zendehrouh, Z.; Shinozuka, M.; Schauer, F.P.

    1975-01-01

    The methodology described is concerned with a system reliability analysis by which the correlation among the level of design for the environmental and natural phenomena (earthquake, flood, tornado, etc.), reasonable practical measure of safety (such as conventional safety factor), and damage (radioactivity release) probability are established. In fact, the methodology indicates how the risk of environmental and natural hazard is combined with a specific design in order to evaluate damage probability associated with the design. This leads to the optimum design decision when combined further with the cost considerations involving the radioactivity release. This fundamental approach is essential in the design of nuclear plant structures, because, unlike the convential structures, the architectural considerations and structural analysis requirements alone cannot, by themselves, result in a balanced design in the framework of social requirements. The proposed methodology incorporates the different methods of environmental load determinations with their respective probabilistic formulations as well as detailed and advanced multi-discipline (structural, mechanical, soil, nuclear physics, biology, etc.) theoretical and empirical analysis including the effect of probabilistic nature of design variables, to establish a sound and reasonable design decision model for nuclear power plants. The information required for the analysis is also described and the areas for which further research is desirable are pointed out. Furthermore, the proposed methodology can very well be utilized to determine the requirements of standardized plants to facilitate the speed of their design and review process

  8. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Science.gov (United States)

    2013-07-31

    ... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear... nuclear power plant. Compliance with the provisions of the rule is required by June 20, 2014. This... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to...

  9. [Research advance in nitrogen metabolism of plant and its environmental regulation].

    Science.gov (United States)

    Xu, Zhenzhu; Zhou, Guangsheng

    2004-03-01

    Nitrogen metabolism is not only one of the basic processes of plant physiology, but also one of the important parts of global chemical cycle. Plant nitrogen assimilation directly takes part in the synthesis and conversion of amino acid through the reduction of nitrate. During this stage, some key enzymes, e.g., nitrate reductase (NR), glutamine synthetase (GS), glutamate dehydrogenase (GDH), glutamine synthase (GOGAT), aspargine synthetase (AS), and asparate aminotransferase (AspAT) participate these processes. The protein is assimilated in plant cell through amino acid, and becomes a part of plant organism through modifying, classifying, transporting and storing processes, etc. The nitrogen metabolism is associated with carbonic metabolism through key enzyme regulations and the conversion of products, which consists of basic life process. Among these amino acids in plant cell, glutamic acid (Glu), glutamine (Gln), aspartic acid (Asp) and asparagines (Asn), etc., play a key role, which regulates their conversion each other and their contents in the plant cell through regulating formation and activity of those key enzymes. Environmental factors also affect the conversion and recycle of the key amino acids through regulating gene expression of the key enzymes and their activities. Nitrate and light intensity positively regulate the gene transcription of NR, but ammonium ions and Glu, Gln do the negative way. Water deficit is a very serious constraint on N2 fixation rate and soybean (Glycine max Merr.) grain yield, in which, ureide accumulation and degradation under water deficit appear to be the key issues of feedback mechanism on nitrogen fixation. Water stress decreases NR activity, but increases proteinase activity, and thus, they regulate plant nitrogen metabolism, although there are some different effects among species and cultivars. Water stress also decreases plant tissue protein content, ratio of protein and amino acid, and reduces the absorption of amino

  10. 75 FR 11575 - James A. Fitzpatrick Nuclear Power Plant Environmental Assessment and Finding of No Significant...

    Science.gov (United States)

    2010-03-11

    ... Power Plant Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory...), for the operation of the James A. FitzPatrick Nuclear Power Plant (JAFNPP) located in Oswego County... the Final Environmental Statement for the James A. FitzPatrick Nuclear Power Plant, Docket No. 50-333...

  11. Environmental monitoring report for Pantex Plant covering 1980

    International Nuclear Information System (INIS)

    Alexander, R.E.; Laseter, W.A.

    1981-03-01

    This report summarizes the environmental monitoring program at Pantex Plant for 1980. Monitoring data for both radioactive and non-radioactive species in the local environment is presented. Although plant activities involve the handling of significant quantities of uranium, plutonium, and tritium, only small releases of uranium (depleted in the isotope 235 U) and tritium occurred which could have affected the local environment. Monitoring data indicate that concentrations of these nuclides in the environment are below established criteria for air and water and therefore do not present a health hazard either to employees or to the public

  12. Environmental monitoring report for Pantex Plant covering 1982

    International Nuclear Information System (INIS)

    Laseter, W.A.

    1983-03-01

    This report summarizes the environmental monitoring program at Pantex Plant for 1982. Monitoring data for both radioactive and non-radioactive species in the local environment is presented. Plant activities involve the handling of significant quantities of uranium, plutonium, and tritium. However, only small releases of uranium (depleted in the isotope 235 U) and tritium occurred which could have affected the local environment. Monitoring data indicate that concentrations of these nuclides in the environment are below established criteria for air and water and therefore should not present a health hazard either to employees or to the public

  13. Environmental considerations for inclusion in program opportunity notices, requests for proposals, and environmental reports: fossil energy demonstration plants

    Energy Technology Data Exchange (ETDEWEB)

    Salk, M.S.; Baird, J.N.; Barnthouse, L.W.; Berry, L.G.; Roop, R.D.; Sanders, F.S.

    1978-01-01

    This document was prepared for the Department of Energy, Division of Coal Conversion, for use in developing Program Opportunity Notices (PON), Requests for Proposals (RFP), and Environmental Reports (ER). Environmental considerations to be addressed by Offerors and Contractors are divided into three parts that correspond to the separate stages of project development: (1) the Offeror's response to the PON or RFP; (2) the Contractor's performance of baseline data collection and environmental impact assessment that results in an Environmental Report (ER) for use by DOE in the preparation of an Environmental Impact Statement (EIS); and (3) the Contractor's continuance of environmental monitoring and assessment during construction and operation. Environmental analysis and environmental protection are an integral part of the Offeror's or Contractor's performance under contract to DOE. Consideration should be given to the health and socioeconomic status of man as well as to the physical and biological environment. The Offeror's or Contractor's consideration of and commitment to avoiding adverse environmental impacts must be demonstrated at every stage of the process from planning through construction and operation.

  14. Environmental control procedures at the Savannah River Plant

    International Nuclear Information System (INIS)

    Sheldon, E.B.

    1975-01-01

    New environmental control activities in the past year at SRP have included improved control and reporting procedures for chemical spills, reclamation of high-value scrap from wastes, new disposal methods for solid wastes not suitable for the sanitary landfill, improved oil containment, and reduction of sediment discharges to on-plant streams. Interdepartmental committees provide the primary routes for planning and coordinating environmental protection throughout SRP. An improved site-use coordination procedure, developed and implemented by ERDA-SR, has provided more effective control and communication pertaining to activities of the several organizations actively using the 300-square-mile SRP site. (auth)

  15. Savannah River Plant environmental report. Annual report for 1984

    International Nuclear Information System (INIS)

    1985-01-01

    Ensuring the radiation safety of the public in the vicinity of the Savannah River Plant (SRP) was a foremost consideration in the design of the plant and has continued to be a primary objective during 31 years of SRP operations. An extensive surveillance program has been continuously maintained since 1951 (before SRP startup) to determine the conecntrations of radionuclides in the environment of the plant and the radiation exposure to the offsite population resulting from SRP operations. The results of this comprehensive monitoring program have been reported to the public since 1959. The scope of the environmental protection program at SRP has increased significantly since the first report was issued. Prior to the mid-1970's the reports contained primarily radiological monitoring data. Beginning in the mid-1970's the reports started including more and more nonradiological monitoring data as those programs increased. The nonradiological monitoring program now approaches the size and extensiveness of the radiological monitoring program. The report name was changed this year to more accurately reflect the many environmental programs that have become an intergral part of the operation of SRP

  16. Generic data sources for the update of an environmental report in support of license renewal

    International Nuclear Information System (INIS)

    Mauro, John J.

    1991-01-01

    Over the past 2 years, our organization has been providing assistance to the NUMARC PLEX working group in matters pertaining to the environmental impacts of license renewal. Part of this support was the identification of data sets and publications that may be useful to the NRC in the preparation of their Environment Report Supplements (ERSs). The following presents a strategy for preparing an ERS, along with references and data sets pertinent to each ER topic. Each section of the ERS should present the following information: (1) Updated information on plant design and operating experience, along with projections of the plant impacts through the end of its currently licensed period of operation. These impacts are used as a baseline against which to compare the projected impacts for the period of license renewal. In addition, the baseline impacts may be compared to the impacts projected in the plant's original Environmental Report and Environmental Impact Statement. (2) Projections of how the impacts may change during the period of license renewal. The purpose of this information will be to determine the degree to which the projected impacts differ significantly from the impacts presented in the original ER and those that have actually occurred during the period of plant operation. We believe that the ERS will reveal that (1) the actual impacts that have occurred during the period of plant operation are comparable to, or less than, those predicted in the original ER, (2) many impacts have been decreasing with time, such as routine radioactive emissions, and (3) the impacts predicted for the period of license renewal will be comparable to, or less than, the baseline impacts. (author)

  17. The Analysis of Sustainable Development Content in the Syllabus of Environmental Knowledge and Plants Ecology Lecture

    Science.gov (United States)

    Putra, A.; Rahmat, A.; Redjeki, S.

    2017-09-01

    This research aims to find out how much the content of sustainable development exist in the content of environmental knowledge and plant ecology courses. The focus indicators of sustainable development indicators is the environment. This research is a qualitative research type with qualitative descriptive approach. The analyzed variables are only 2 courses, which are environmental knowledge and plants ecology. The results showed that the syllabus contents analysis of environmental knowledge and plants ecology courses in private Lembaga Pendidikan Tenaga Kependidikan (LPTK) in the province of Nusa Tenggara Barat is already good enough and the sustainable development contents is very large, almost all syllabus contents has already prioritize the sustainable development load of both the subject of environmental knowledge and plants ecology, although there are still some syllabus contents that was not includes sustainable development load, but the percentage is quite small, especially in the course of Plant Ecology.

  18. A comparison of baseline methodologies for 'Reducing Emissions from Deforestation and Degradation'

    Directory of Open Access Journals (Sweden)

    Kok Kasper

    2009-07-01

    Full Text Available Abstract Background A mechanism for emission reductions from deforestation and degradation (REDD is very likely to be included in a future climate agreement. The choice of REDD baseline methodologies will crucially influence the environmental and economic effectiveness of the climate regime. We compare three different historical baseline methods and one innovative dynamic model baseline approach to appraise their applicability under a future REDD policy framework using a weighted multi-criteria analysis. Results The results show that each baseline method has its specific strengths and weaknesses. Although the dynamic model allows for the best environmental and for comparatively good economic performance, its high demand for data and technical capacity limit the current applicability in many developing countries. Conclusion The adoption of a multi-tier approach will allow countries to select the baseline method best suiting their specific capabilities and data availability while simultaneously ensuring scientific transparency, environmental effectiveness and broad political support.

  19. Environmental determinants of woody plant diversity at a regional scale in China.

    Directory of Open Access Journals (Sweden)

    Hong Qian

    Full Text Available Understanding what drives the geographic variation of species richness across the globe is a fundamental goal of ecology and biogeography. Environmental variables have been considered as drivers of global diversity patterns but there is no consensus among ecologists on what environmental variables are primary drivers of the geographic variation of species richness. Here, I examine the relationship of woody plant species richness at a regional scale in China with sixteen environmental variables representing energy availability, water availability, energy-water balance, seasonality, and habitat heterogeneity. I found that temperature seasonality is the best predictor of woody species richness in China. Other important environmental variables include annual precipitation, mean temperature of the coldest month, and potential evapotranspiration. The best model explains 85% of the variation in woody plant species richness at the regional scale in China.

  20. Environmental monitoring at the Savannah River Plant. Annual report, 1980

    International Nuclear Information System (INIS)

    Zeigler, C.C.; Culp, P.A.; Smith, D.L.

    1983-11-01

    The results of the 1980 Savannah River Plant environmental monitoring program are presented. Appendices contain data analysis and quality control information, minimum detectable levels, tabes of environmental sample analyses, and maps of sampling locations. Radioactive releases are divided into four categories for comparison with previous releases. The categories are: tritium, noble gases, beta and gamma emitters, and total alpha emitters. 34 figures, 58 tables

  1. Environmentally Optimal, Nutritionally Aware Beef Replacement Plant-Based Diets.

    Science.gov (United States)

    Eshel, Gidon; Shepon, Alon; Noor, Elad; Milo, Ron

    2016-08-02

    Livestock farming incurs large and varied environmental burdens, dominated by beef. Replacing beef with resource efficient alternatives is thus potentially beneficial, but may conflict with nutritional considerations. Here we show that protein-equivalent plant based alternatives to the beef portion of the mean American diet are readily devisible, and offer mostly improved nutritional profile considering the full lipid profile, key vitamins, minerals, and micronutrients. We then show that replacement diets require on average only 10% of land, 4% of greenhouse gas (GHG) emissions, and 6% of reactive nitrogen (Nr) compared to what the replaced beef diet requires. Applied to 320 million Americans, the beef-to-plant shift can save 91 million cropland acres (and 770 million rangeland acres), 278 million metric ton CO2e, and 3.7 million metric ton Nr annually. These nationwide savings are 27%, 4%, and 32% of the respective national environmental burdens.

  2. Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado

    International Nuclear Information System (INIS)

    1987-06-01

    This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs

  3. Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1987-06-01

    This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs.

  4. University-Company Cooperation in a Hydroelectric Plant: Cooperation Study in Environmental Management

    Directory of Open Access Journals (Sweden)

    Fabricio Mussi

    2017-05-01

    Full Text Available Hydroelectric power plants are considered strategic for the country when considering their relevance and impact on other sectors of the economy. However, the dynamics of the operation of a plant, its support structure and power generation activities can cause impacts on the environment, which must be constantly monitored in order to mitigate any environmental risks. The purpose of this study is to examine the partnership relations between a plant by menas of the creation of a department within the environmental management and universities and research institutes to identify specific partnerships in environmental management and hydroelectric plants. Six projects have been selected for analysis, four of them related to projects with universities and two related to cooperation with research institutes. The focus of the analysis was restricted to the main points observed in the management of these partnerships, which are: (a motivation for establishing partnerships, (b the composition of the estimated costs for implementing these partnerships, (c the difficulties of reconciling technical management and financial management, and (d the measurement of results and contributions from these interactions. Administrative practices of management of partnerships were also analyzed in the stages preceding cooperation for cooperation and further cooperation. Although other such studies are needed to strengthen the findings presented, one can conclude that the purposes of the establishment of cooperation in environmental management differ from those observed in other fields of knowledge such as engineering and biotechnology, for example.

  5. Environmental report of Purex Plant and Uranium Oxide Plant - Hanford reservation

    International Nuclear Information System (INIS)

    1979-04-01

    A description of the site, program, and facilities is given. The data and calculations indicate that there will be no significant adverse environmental impact from the resumption of full-scale operations of the Purex and Uranium Oxide Plants. All significant pathways of radionuclides in Purex Plant effluents are evaluated. This includes submersion in the airborne effluent plumes, consumption of drinking water and foodstuffs irrigated with Columbia River water, ingestion of radioactive iodine through the cow-to-milk pathway, consumption of fish, and other less significant pathways. A summary of research and surveillance programs designed to assess the possible changes in the terresstrial and aquatic environments on or near the Hanford Reservation is presented. The nonradiological discharges to the environment of prinicpal interest are chemicals, sewage, and solid waste. These discharges will not lead to any significant adverse effects on the environment

  6. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 2. Draft environmental statement

    Energy Technology Data Exchange (ETDEWEB)

    Pennington, W. H.

    1976-06-01

    The need for additional uranium enrichment facilities and the environmental impacts of the add-on gaseous diffusion plant proposed for the Portsmouth Gaseous Diffusion Plant are discussed. A detailed description of the proposed facilities is included and unavoidable adverse environmental effects, possible alternatives, and anticipated benefits from the proposed facilities are considered. The flora and fauna of the area are tabulated and possible effects of air and water pollution on aquatic and terrestrial ecosystems are postulated. The extent of anticipated noise impact on the vicinity and the anticipated extent of civic envolvement are discussed. (CH)

  7. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 2. Draft environmental statement

    International Nuclear Information System (INIS)

    1976-06-01

    The need for additional uranium enrichment facilities and the environmental impacts of the add-on gaseous diffusion plant proposed for the Portsmouth Gaseous Diffusion Plant are discussed. A detailed description of the proposed facilities is included and unavoidable adverse environmental effects, possible alternatives, and anticipated benefits from the proposed facilities are considered. The flora and fauna of the area are tabulated and possible effects of air and water pollution on aquatic and terrestrial ecosystems are postulated. The extent of anticipated noise impact on the vicinity and the anticipated extent of civic envolvement are discussed

  8. Biological invasions: economic and environmental costs of alien plant, animal, and microbe species

    National Research Council Canada - National Science Library

    Pimentel, David

    2011-01-01

    ...: Economic and Environmental Costs of Alien Plant, Animal, and Microbe Species, this reference discusses how non-native species invade new ecosystems and the subsequent economic and environmental effects of these species...

  9. Patterns and Environmental Determinants of Medicinal Plant : Vascular Plant Ratios in Xinjiang, Northwest China

    Science.gov (United States)

    Zhang, Bengang; Xiao, Peigen; Qi, Yaodong; Zhang, Zhao; Liu, Haitao; Li, Xiaojin; Wang, Guoping; Terwei, André

    2016-01-01

    With both a full collection of native vascular plant distributions and a full checklist of source plants of the Chinese Materia Medica (CMM), the Uygur Medicine (UM), and the Kazak Medicine (KM) for the Xinjiang region, we defined medicinal plant: vascular plant ratios (simplified as medicinal plant ratios hereafter) as the value of medicinal plant richness divided by vascular plant richness. We aimed to find whether the ratios are constant or change in different environments, which environmental variables determine medicinal plant ratios, and whether the ratios are more influenced by human or by natural environments. Finally, suggestions for medicinal plant conservation were addressed. We found that (1) medicinal plant ratios were not constant, and they were high in the Tarim Basin which was largely covered by desert, while they were relatively low in mountainous areas, especially in the Tianshan Mountains where the general species richness was high; (2) medicinal plant ratios were not significantly influenced by human activities, indicated by human population density distributions, but they were highly correlated with plant species richness and climate, i.e. ratios decreased with plant species richness and MAP, and were related quadratically with MAT; (3) CMM ratio and UM ratio were more influenced by plant richness than by climate, while KM ratio was more influenced by climate. We concluded that the percentages of plants used as medicines were not influenced by distances from human settlements, but were determined by species richness or climate. We suggest that (1), in general, the medicinal plant ratio could be a complementary indicator for medicinal plant conservation planning and (2), for the region of Xinjiang, not only high diversity areas, but also some extreme environments should be considered as compensation for a better protection of medicinal plants. PMID:27391239

  10. Patterns and Environmental Determinants of Medicinal Plant : Vascular Plant Ratios in Xinjiang, Northwest China.

    Directory of Open Access Journals (Sweden)

    Liping Li

    Full Text Available With both a full collection of native vascular plant distributions and a full checklist of source plants of the Chinese Materia Medica (CMM, the Uygur Medicine (UM, and the Kazak Medicine (KM for the Xinjiang region, we defined medicinal plant: vascular plant ratios (simplified as medicinal plant ratios hereafter as the value of medicinal plant richness divided by vascular plant richness. We aimed to find whether the ratios are constant or change in different environments, which environmental variables determine medicinal plant ratios, and whether the ratios are more influenced by human or by natural environments. Finally, suggestions for medicinal plant conservation were addressed. We found that (1 medicinal plant ratios were not constant, and they were high in the Tarim Basin which was largely covered by desert, while they were relatively low in mountainous areas, especially in the Tianshan Mountains where the general species richness was high; (2 medicinal plant ratios were not significantly influenced by human activities, indicated by human population density distributions, but they were highly correlated with plant species richness and climate, i.e. ratios decreased with plant species richness and MAP, and were related quadratically with MAT; (3 CMM ratio and UM ratio were more influenced by plant richness than by climate, while KM ratio was more influenced by climate. We concluded that the percentages of plants used as medicines were not influenced by distances from human settlements, but were determined by species richness or climate. We suggest that (1, in general, the medicinal plant ratio could be a complementary indicator for medicinal plant conservation planning and (2, for the region of Xinjiang, not only high diversity areas, but also some extreme environments should be considered as compensation for a better protection of medicinal plants.

  11. Patterns and Environmental Determinants of Medicinal Plant : Vascular Plant Ratios in Xinjiang, Northwest China.

    Science.gov (United States)

    Li, Liping; Zhang, Bengang; Xiao, Peigen; Qi, Yaodong; Zhang, Zhao; Liu, Haitao; Li, Xiaojin; Wang, Guoping; Terwei, André

    2016-01-01

    With both a full collection of native vascular plant distributions and a full checklist of source plants of the Chinese Materia Medica (CMM), the Uygur Medicine (UM), and the Kazak Medicine (KM) for the Xinjiang region, we defined medicinal plant: vascular plant ratios (simplified as medicinal plant ratios hereafter) as the value of medicinal plant richness divided by vascular plant richness. We aimed to find whether the ratios are constant or change in different environments, which environmental variables determine medicinal plant ratios, and whether the ratios are more influenced by human or by natural environments. Finally, suggestions for medicinal plant conservation were addressed. We found that (1) medicinal plant ratios were not constant, and they were high in the Tarim Basin which was largely covered by desert, while they were relatively low in mountainous areas, especially in the Tianshan Mountains where the general species richness was high; (2) medicinal plant ratios were not significantly influenced by human activities, indicated by human population density distributions, but they were highly correlated with plant species richness and climate, i.e. ratios decreased with plant species richness and MAP, and were related quadratically with MAT; (3) CMM ratio and UM ratio were more influenced by plant richness than by climate, while KM ratio was more influenced by climate. We concluded that the percentages of plants used as medicines were not influenced by distances from human settlements, but were determined by species richness or climate. We suggest that (1), in general, the medicinal plant ratio could be a complementary indicator for medicinal plant conservation planning and (2), for the region of Xinjiang, not only high diversity areas, but also some extreme environments should be considered as compensation for a better protection of medicinal plants.

  12. Marine ecosystem analysis for Kori nuclear power plant

    International Nuclear Information System (INIS)

    Lee, C.H.; Kim, Y.H.; Cho, T.S.

    1980-01-01

    The effect of both radioactive and thermal effluents discharged from the plant on aquatic ecosystem is one of the primary concerns in evaluating the environmental impact due to the operation of the nuclear power plant. Biological alteration of aquatic ecosystems may be resulted from radioactive effluents, thermal pollution and chemical releases. There is also another possible synergistic effect, that is, the combination of the above stresses, which may cause an impact severer than that of the sum of the individual impact. This report deals with species diversity and seasonal variations of those numbers of phytoplankton, marine algae and microorganisms, and distribution of radioactivity of marine organisms, as well as those data pertaining to sea water analysis. The present survey is designed to provide a partial baseline information for environmental impact assessment of Kori nuclear plant unit no. 1. (author)

  13. Paducah Gaseous Diffusion Plant Annual Site Environmental Report for 1993

    International Nuclear Information System (INIS)

    1994-10-01

    The purpose of this document is to summarize effluent monitoring and environmental surveillance results and compliance with environmental laws, regulations, and orders at the Paducah Gaseous Diffusion Plant (PGDP). Environmental monitoring at PGDP consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring is direct measurement or the collection and analysis of samples of liquid and gaseous discharges to the environment. Environmental surveillance is direct measurement or the collection and analysis of samples of air, water, soil, foodstuff, biota, and other media. Environmental monitoring is performed to characterize and quantify contaminants, assess radiation exposures of members of the public, demonstrate compliance with applicable standards and permit requirements, and detect and assess the effects (if any) on the local environment. Multiple samples are collected throughout the year and are analyzed for radioactivity, chemical content, and various physical attributes

  14. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  15. Annual radiological environmental operating report: Browns Ferry Nuclear Plant, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant (BFN) in 1992. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. Small amounts of Co-60 and Cs-134 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public

  16. Research on Chinese life cycle-based wind power plant environmental influence prevention measures.

    Science.gov (United States)

    Wang, Hanxi; Xu, Jianling; Liu, Yuanyuan; Zhang, Tian

    2014-08-19

    The environmental impact of wind power plants over their life cycle is divided into three stages: construction period, operation period and retired period. The impact is mainly reflected in ecological destruction, noise pollution, water pollution and the effect on bird migration. In response to these environmental effects, suggesting reasonable locations, reducing plant footprint, optimizing construction programs, shielding noise, preventing pollution of terrestrial ecosystems, implementing combined optical and acoustical early warning signals, making synthesized use of power generation equipment in the post-retired period and using other specific measures, including methods involving governance and protection efforts to reduce environmental pollution, can be performed to achieve sustainable development.

  17. Environmental program audit: Oak Ridge Gaseous Diffusion Plant, Roane County, Tennessee. Final report

    International Nuclear Information System (INIS)

    Smith, W.M.; Waller, R.

    1985-01-01

    An environmental audit of the Oak Ridge Gaseous Diffusion Plant (ORGDP) was conducted by a team of NUS scientists and engineers during the week of June 3 through June 7, 1985. ORGDP is owned by the Department of Energy and operated by Martin-Marietta Energy Systems, Inc. To enrich uranium feedstocks for nuclear fuels. The team evaluated ORGDP in terms of compliance with environmental regulations and DOE Orders, the adequacy of pollution control equipment, the effectiveness of environmental monitoring, and the application of quality control procedures to environmental programs. The audit was conducted by observing operations, inspecting facilities, evaluating analysis and monitoring techniques, reviewing reports and data, and interviewing personnel. Overall, the ORGDP environmental program appears to be well structured and has attempted to address all areas of air, water, and land media likely to be affected by the operations of the facility. The plant management is knowledgeable about environmental concerns and has established clear, well-defined goals to address these areas. An adequate professional staff is available to manage the environmental program

  18. Environmental costs and benefits case study: nuclear power plant. Quantification and economic valuation of selected environmental impacts/effects. Final report

    International Nuclear Information System (INIS)

    1984-02-01

    This case study is an application, to a nuclear power plant, of the methodology for quantifying environmental costs and benefits, contained in the regional energy plan, adopted in April, 1983, by the Northwest Power Planning Council, pursuant to Public Law 96-501.The study is based on plant number 2 of the Washington Public Power Supply System (WNP-2), currently nearing completion on the Hanford Nuclear Reservation in eastern Washington State. This report describes and documents efforts to quantify and estimate monetary values for the following seven areas of environmental effects: radiation/health effects, socioeconomic/infrastructure effects, consumptive use of water, psychological/health effects (fear/stress), waste management, nuclear power plant accidents, and decommissioning costs. 103 references

  19. Classification of baseline toxicants for QSAR predictions to replace fish acute toxicity studies.

    Science.gov (United States)

    Nendza, Monika; Müller, Martin; Wenzel, Andrea

    2017-03-22

    Fish acute toxicity studies are required for environmental hazard and risk assessment of chemicals by national and international legislations such as REACH, the regulations of plant protection products and biocidal products, or the GHS (globally harmonised system) for classification and labelling of chemicals. Alternative methods like QSARs (quantitative structure-activity relationships) can replace many ecotoxicity tests. However, complete substitution of in vivo animal tests by in silico methods may not be realistic. For the so-called baseline toxicants, it is possible to predict the fish acute toxicity with sufficient accuracy from log K ow and, hence, valid QSARs can replace in vivo testing. In contrast, excess toxicants and chemicals not reliably classified as baseline toxicants require further in silico, in vitro or in vivo assessments. Thus, the critical task is to discriminate between baseline and excess toxicants. For fish acute toxicity, we derived a scheme based on structural alerts and physicochemical property thresholds to classify chemicals as either baseline toxicants (=predictable by QSARs) or as potential excess toxicants (=not predictable by baseline QSARs). The step-wise approach identifies baseline toxicants (true negatives) in a precautionary way to avoid false negative predictions. Therefore, a certain fraction of false positives can be tolerated, i.e. baseline toxicants without specific effects that may be tested instead of predicted. Application of the classification scheme to a new heterogeneous dataset for diverse fish species results in 40% baseline toxicants, 24% excess toxicants and 36% compounds not classified. Thus, we can conclude that replacing about half of the fish acute toxicity tests by QSAR predictions is realistic to be achieved in the short-term. The long-term goals are classification criteria also for further groups of toxicants and to replace as many in vivo fish acute toxicity tests as possible with valid QSAR

  20. Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-09-01

    This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, open-quotes Environment, Safety, and Health Appraisal Program,close quotes establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE's environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements

  1. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  2. Monitoring the Environmental Impact of TiO2 Nanoparticles Using a Plant-Based Sensor Network

    Science.gov (United States)

    Lenaghan, Scott C.; Li, Yuanyuan; Zhang, Hao; Burris, Jason N.; Stewart, C. Neal; Parker, Lynne E.; Zhang, Mingjun

    2016-01-01

    The increased manufacturing of nanoparticles for use in cosmetics, foods, and clothing necessitates the need for an effective system to monitor and evaluate the potential environmental impact of these nanoparticles. The goal of this research was to develop a plant-based sensor network for characterizing, monitoring, and understanding the environmental impact of TiO2 nanoparticles. The network consisted of potted Arabidopsis thaliana with a surrounding water supply, which was monitored by cameras attached to a laptop computer running a machine learning algorithm. Using the proposed plant sensor network, we were able to examine the toxicity of TiO2 nanoparticles in two systems: algae and terrestrial plants. Increased terrestrial plant growth was observed upon introduction of the nanoparticles, whereas algal growth decreased significantly. The proposed system can be further automated for high-throughput screening of nanoparticle toxicity in the environment at multiple trophic levels. The proposed plant-based sensor network could be used for more accurate characterization of the environmental impact of nanomaterials. PMID:28458617

  3. How Do Plants and Phytohormones Accomplish Heterophylly, Leaf Phenotypic Plasticity, in Response to Environmental Cues

    Directory of Open Access Journals (Sweden)

    Hokuto Nakayama

    2017-10-01

    Full Text Available Plant species are known to respond to variations in environmental conditions. Many plant species have the ability to alter their leaf morphology in response to such changes. This phenomenon is termed heterophylly and is widespread among land plants. In some cases, heterophylly is thought to be an adaptive mechanism that allows plants to optimally respond to environmental heterogeneity. Recently, many research studies have investigated the occurrence of heterophylly in a wide variety of plants. Several studies have suggested that heterophylly in plants is regulated by phytohormones. Herein, we reviewed the existing knowledge on the relationship and role of phytohormones, especially abscisic acid, ethylene, gibberellins, and auxins (IAA, in regulating heterophylly and attempted to elucidate the mechanisms that regulate heterophylly.

  4. Potential environmental effects of fusion reactor power plants

    International Nuclear Information System (INIS)

    Young, J.R.; Gore, B.F.; Coffman, F.E.

    1976-01-01

    Construction and operation of fusion power plants is expected to reduce the total environmental effects of 21st century power generation. Fusion power plant impacts due to noise, odors, vibrations, and sanitary wastes are expected to be insignificant. impacts due to land use, chemical releases, and aesthetics are expected to be reduced. Impacts due to heat releases, local socio-economic changes, and non-radioactive liquid and solid disposal are expected to be comparable to those for the alternative fission or coal-fired power systems. Radiation doses to the public due to radioactive wastes are expected to be comparable to, or less than, the trivial low doses due to fission power systems. Research and development will be required, however, to assure adequate containment of tritium, the primary radioisotope of concern. Prevention of accidental tritium releases is within the capability of current engineering practice. Current technology is capable of handling the solid radioactive waste which may be produced, with insignificant environmental impact. Major research efforts are necessary to determine if subtle long-term effects of magnetic fields exist and should be of concern. In view of the large quantities of construction materials required for fusion. Material availability may dictate 21st century power plant design and construction. The accident potential of fusion power plants should be lower than for fission systems. Accidental criticalities and plasma runaways are not considered to be possible. Loss of coolant accidents are not expected to result in damage to the containment. No fission products or actinides are present to be released in an accident, and most activation products are immobilized in structures. The biological hazard of tritium is orders of magnitude smaller than for fission products and actinides. Safeguards against diversion of fissile materials are not expected to be necessary

  5. Environmental Impact Statement: Waste Isolation Pilot Plant (WIPP): Executive summary

    International Nuclear Information System (INIS)

    1980-10-01

    The purpose of this document is to provide a summary of the environmental impact statement for the Waste Isolation Pilot Plant (WIPP) project. The Draft Environmental Impact Statement for the WIPP was published by the US Department of Energy (DOE) in April 1979. This document was reviewed and commented on by members of the general public, private organizations, and governmental agencies. The Final Environmental Impact Statement was subsequently published in October, 1980. This summary is designed to assist decision-maker and interested individuals in reviewing the material presented in the environmental impact statement for the WIPP project. To make this material widely available, this summary is published in both Spanish and English. Additional, more detailed information concerning the environmental and safety consequences of the WIPP project is available in the Final Environmental Impact Statement. Written comments and public hearing comments on the Draft Environmental Impact Statement are available for review. 27 refs., 4 figs., 7 tabs

  6. A comparative study among fossil fuel power plants in PJM and California ISO by DEA environmental assessment

    International Nuclear Information System (INIS)

    Sueyoshi, Toshiyuki; Goto, Mika

    2013-01-01

    This study compares among fossil fuel power plants in PJM and California ISO by their unified (operational and environmental) performance. DEA (Data Envelopment Analysis) is used as a methodology. For comparative analysis, DEA incorporates strategic concepts such as natural and managerial disposability into the computational process. This study explores both how to measure Returns to Scale (RTS) under natural disposability and how to measure Damages to Scale (DTS) under managerial disposability. This empirical study obtains two implications on US energy policy. One of the two policy implications is that California ISO outperforms PJM in terms of the three unified efficiency measures. The result implies that strict regulation on undesirable outputs, as found in California, is important in enhancing the performance of US fossil fuel power plants. Thus, it is necessary for federal and local governments to regulate the fossil fuel power plants under the strict implementation of environmental protection. Under such a policy direction, it is possible for US fossil fuel power plants to attain economic prosperity (by enhancing their operational efficiencies) and to satisfy environmental regulation (by enhancing their environmental efficiencies). The other policy implication is that coal-fired and gas-fired power plants in PJM and California ISO need to reduce their operational sizes or introduce technology innovation on desirable and undesirable outputs and/or new management for environmental protection within their operations. Meanwhile, oil-fired power plants may increase their operational sizes if they can introduce technology innovation and new management on undesirable outputs. - Highlights: • This study compares fossil fuel power plants in PJM and California ISO. • California ISO outperforms PJM in terms of their unified efficiency measures. • Regulation by Clean Air Act is important for environmental protection. • Fossil fuel power plants need technology

  7. Environmental life cycle assessment of high temperature nuclear fission and fusion biomass gasification plants

    International Nuclear Information System (INIS)

    Takeda, Shutaro; Sakurai, Shigeki; Kasada, Ryuta; Konishi, Satoshi

    2017-01-01

    The authors propose nuclear biomass gasification plant as an advancement of conventional gasification plants. Environmental impacts of both fission and fusion plants were assessed through life cycle assessment. The result suggested the reduction of green-house gas emissions would be as large as 85.9% from conventional plants, showing a potential for the sustainable future for both fission and fusion plants. (author)

  8. Site environmental report for calendar year 1992, Kansas City Plant, Kansas City, Missouri

    International Nuclear Information System (INIS)

    1993-05-01

    The Kansas City Plant is a government-owned, contractor-operated facility. AlliedSignal and its predecessors have been the operating contractors since 1949. The principal operation performed at the Kansas City Plant is the manufacture of non-nuclear components for nuclear weapons. This activity involves metals and plastics machining, plastics fabrication, plating, microelectronics, and electrical and mechanical assembly. No radioactive materials are machined or processed. This report presents information and data pertaining to the environmental monitoring program and compliance with environmental standards

  9. PRODUCTION, ECONOMIC AND ENVIRONMENTAL EFFECTS OF AGRICULTURAL BIOGAS PLANT IN KOSTKOWICE

    Directory of Open Access Journals (Sweden)

    Karol Węglarzy

    2017-06-01

    Full Text Available This paper presents the economic and ecological effect of Kostkowice Agricultural biogas plant based on a four year study carried out on the prototype installation. Agricultural biogas plant is part of the nature of the research conducted for twenty years at the National Research Institute of Animal PIB Experimental Station. Prof. Mieczyslaw Czaja relates to various aspects of environmental protection. It describes the economic justification for the production of energy from waste biomass (manure, slurry, wastes from feeding table, by the characteristics of substrates and products. It was found that agricultural biogas plant in rural areas are an important link in energy security, mainly due to the very high availability. Ecological effect is presented as effect of the installation solutions for the reduction of pollution of water, soil and air. Reducing greenhouse gas emissions through the recycling of environmentally harmful by-products of animal production of electricity and thermal energy, which is a substitute for environmentally harmful fossil fuels. The advantage of substances digestate is odorless, which is important both in an effort to improve the work culture in agriculture and improving living conditions in rural communities and it is an indisputable argument for the use of biomass for energy purposes.

  10. Environmental conditions influence the plant functional diversity effect on potential denitrification.

    Directory of Open Access Journals (Sweden)

    Ariana E Sutton-Grier

    2011-02-01

    Full Text Available Global biodiversity loss has prompted research on the relationship between species diversity and ecosystem functioning. Few studies have examined how plant diversity impacts belowground processes; even fewer have examined how varying resource levels can influence the effect of plant diversity on microbial activity. In a field experiment in a restored wetland, we examined the role of plant trait diversity (or functional diversity, (FD and its interactions with natural levels of variability of soil properties, on a microbial process, denitrification potential (DNP. We demonstrated that FD significantly affected microbial DNP through its interactions with soil conditions; increasing FD led to increased DNP but mainly at higher levels of soil resources. Our results suggest that the effect of species diversity on ecosystem functioning may depend on environmental factors such as resource availability. Future biodiversity experiments should examine how natural levels of environmental variability impact the importance of biodiversity to ecosystem functioning.

  11. Environmental monitoring report for Pantex Plant covering 1984

    International Nuclear Information System (INIS)

    Laseter, W.A.

    1985-01-01

    This report summarizes the environmental monitoring program at Pantex Plant for 1984. It has been prepared in accordance with the United States Department of Energy Order 5484.1. This report presents monitoring data for both radioactive and non-radioactive species in the local environment. Plant activities involve the handling of significant quantities of uranium, plutonium, and tritium. However, only a small release of tritium occurred which could have affected the local environment. Monitoring data indicate that concentrations of this nuclide in the environment are below established criteria for air and water and therefore should not present a health hazard either to employees or to the public. 22 refs., 7 figs., 23 tabs

  12. Environmental monitoring report for Pantex Plant covering 1978

    International Nuclear Information System (INIS)

    Alexander, R.E.; Cornelius, V.A.

    1979-05-01

    This report summarizes the environmental monitoring program at Pantex Plant for 1978. It has been prepared in accordance with the United States Department of Energy Manual Chapter 0513. This report presents monitoring data for both radioactive and non-radioactive species in the local environment. Although plant activities involve the handling of significant quantities of uranium, plutonium, and tritium, only small releases of uranium (depleted in the isotope 235 U) and tritium occurred which could have affected the local environment. Monitoring data indicate that concentrations of these nuclides in the environment are below established criteria for air and water and therefore should not present a health hazard either to employees or to the public

  13. Environmental cost/benefit analysis for fusion power plants

    International Nuclear Information System (INIS)

    Young, J.R.

    1976-11-01

    This document presents a cost/benefit analysis of use of fusion power plants early in the 21st century. The first section describes the general formulation of the analysis. Included are the selection of the alternatives to the fusion reactor, selection of the power system cases to be compared, and a general comparison of the environmental effects of the selected alternatives. The second section compares the cumulative environmental effects from 2010 to 2040 for the primary cases of the power system with and without fusion reactors. The third section briefly illustrates the potential economic benefits if fusion reactors produce electricity at a lower unit cost than LMFBRs can. The fourth section summarizes the cost/benefit analysis

  14. Base-line studies for DAE establishments

    International Nuclear Information System (INIS)

    Puranik, V.D.

    2012-01-01

    The Department of Atomic Energy has establishments located in various regions of the country and they include front-end fuel cycle facilities, nuclear power stations, back-end fuel cycle facilities and facilities for research and societal applications. These facilities handle naturally occurring radionuclides such as uranium, thorium and a variety of man-made radionuclides. These radionuclides are handled with utmost care so that they do not affect adversely the occupational workers or the members of public residing nearby. There is safety culture of the highest standard existing in all DAE establishments and it matches with the international standards. In addition, there is a perpetual environmental monitoring program carried out by the Environmental Survey Laboratories (ESLs) located at all DAE establishments. The environmental data generated by such program is studied regularly by experts to ensure compliance with the regulatory requirements. The regulatory requirements in the country are of international standards and ensure adequate protection of workers and members of public. In addition to such continued monitoring program and studies being carried out for the ongoing projects, base-line studies are carried out for all the new projects of the DAE. The purpose of the base-line studies is to establish a detailed base-line data set for a new DAE location well before the foundation stone is laid, so that the data collected when there is no departmental activity can be compared with the data generated later by the ESL. The data so generated is site specific and it varies from place to place depending upon the location of the site, e.g., inland or coastal, the presence of water bodies and pattern of irrigation, the geological characteristics of the location, the local culture and habits of the people, population density and urban or rural background. The data to be recorded as base-line data is generated over a period of at least one year covering all the seasons

  15. Exergic, economic and environmental impacts of natural gas and diesel in operation of combined cycle power plants

    International Nuclear Information System (INIS)

    Mohammadi Khoshkar Vandani, Amin; Joda, Fatemeh; Bozorgmehry Boozarjomehry, Ramin

    2016-01-01

    Highlights: • Investigating the effect of natural gas and diesel on the power plant performance. • Exergy, economic and environmental evaluation of a combined cycle power plant. • Using life cycle assessment (LCA) to perform the environmental evaluation. • Optimizing the power plant in terms of exergy and economic. • Better performance of natural gas with respect to diesel. - Abstract: Combined cycle power plants (CCPPs) play an important role in electricity production throughout the world. Their energy efficiency is relatively high and their production rates of greenhouse gases are considerably low. In a country like Iran with huge oil and gas resources, most CCPP’s use natural gas as primary fuel and diesel as secondary fuel. In this study, effect of using diesel instead of natural gas for a selected power plant will be investigated in terms of exergy, economic and environmental impacts. The environmental evaluation is performed using life cycle assessment (LCA). In the second step, the operation of the plant will be optimized using exergy and economic objective functions. The results show that the exergy efficiency of the plant with natural gas as fuel is equal to 43.11%, while this efficiency with diesel will be 42.03%. Furthermore, the annual cost of plant using diesel is twice as that of plant using natural gas. Finally, diesel utilization leads to more contaminants production. Thus, environmental effects of diesel are much higher than that of natural gas. The optimization results demonstrate that in case of natural gas, exergy efficiency and annual cost of the power plant improve 2.34% and 4.99%, respectively. While these improvements for diesel are 2.36% and 1.97%.

  16. Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE`s environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  17. Global environmental change effects on plant community composition trajectories depend upon management legacies

    NARCIS (Netherlands)

    Perring, Michael P.; Bernhardt-Römermann, Markus; Baeten, Lander; Midolo, Gabriele; Blondeel, Haben; Depauw, Leen; Landuyt, Dries; Maes, Sybryn L.; Lombaerde, De Emiel; Carón, Maria Mercedes; Vellend, Mark; Brunet, Jörg; Chudomelová, Markéta; Decocq, Guillaume; Diekmann, Martin; Dirnböck, Thomas; Dörfler, Inken; Durak, Tomasz; Frenne, De Pieter; Gilliam, Frank S.; Hédl, Radim; Heinken, Thilo; Hommel, Patrick; Jaroszewicz, Bogdan; Kirby, Keith J.; Kopecký, Martin; Lenoir, Jonathan; Li, Daijiang; Máliš, František; Mitchell, Fraser J.G.; Naaf, Tobias; Newman, Miles; Petřík, Petr; Reczyńska, Kamila; Schmidt, Wolfgang; Standovár, Tibor; Świerkosz, Krzysztof; Calster, Van Hans; Vild, Ondřej; Wagner, Eva Rosa; Wulf, Monika; Verheyen, Kris

    2018-01-01

    The contemporary state of functional traits and species richness in plant communities depends on legacy effects of past disturbances. Whether temporal responses of community properties to current environmental changes are altered by such legacies is, however, unknown. We expect global environmental

  18. Environmental design of thermal and nuclear power plants. Its history and effects

    International Nuclear Information System (INIS)

    Yamamoto, Kimio

    1999-01-01

    In order to realize coexistence between electric power plants and local environment, a historical transition on scene and greenization, one of typical environmental coexistence method, and on design of environmental facility was arranged to elucidate a direction of future environmental coexistence. And, a draft of local scene creation type design possible to make it for a symbol at the area was investigated to quantitatively elucidate an effect of the scene design on local peoples by using some metrical psychological experiments. As a result, it was found from an evaluation value profile in each age that younger generation showed severer evaluation against the scene design. And, also found that scene image on the power plant is constructed by four axes of 'regularity', 'symbolicity', 'cleanliness', and traditionality', of which design method (color, shape design, and so forth) effect was clarified. (G.K.)

  19. ICPP [Idaho Chemical Processing Plant] environmental monitoring report, CY-1988

    International Nuclear Information System (INIS)

    Krivanek, K.R.

    1989-08-01

    Summarized in this report are the data collected through Environmental Monitoring programs conducted at the Idaho Chemical Processing Plant (ICPP) by the Environmental Engineering (EE) Section of the Nuclear and Industrial Safety (N and IS) Department. The ICPP is responsible for complying with all applicable Federal, State, Local and DOE Rules, Regulations and Orders. Radiological effluent and emissions are regulated by the DOE. The Environmental Protection Agency (EPA) regulates all nonradiological waste resulting from the ICPP operations including all airborne, liquid, and solid waste. The EE subsection completed a Quality Assurance (QA) Plan for Environmental Monitoring activities during the third quarter of 1986. QA activities have resulted in the ICPP's implementation of the Environmental Protection Agency rules and guidelines pertaining to the collection, analyses, and reporting of environmentally related samples. Where no approved methods for analyses existed for radionuclides, currently used methods were submitted for the EPA approval. 33 figs., 14 tabs

  20. Angra nuclear plant - environmental control program; Usina Nuclear de Angra: programa de controle ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Kircher, E; Cruz, E.S. da [FURNAS, Rio de Janeiro, RJ (Brazil)

    1990-12-31

    The pre-operational studies, that were elaborated before the beginning of Angra I Power Plant operation, are described in particular the environmental radiological safety area till the fuel loading in the core reactor. Several aspects are included, as socio-economic survey, seismological analysis, Meteorological Program, marine biology, water cooling system, exposure measures of natural radiation, marine sediments characterization in the effluent dispersion area and Environmental Radiological Monitoring Program. The main environmental programs developed for the operational phase of the Angra I Plant are also presented, citing some considerations about the Meteorological Program, Marine Biology Control Program, Temperature and Chlorine Control in Piraquara de Fora Bay, Radiological Environmental Monitoring Program, Sanitary Effluent Control Program and Radiological Emergency Program. (C.G.C.). 2 refs.

  1. Modern cooling systems in thermal power plants relieve environmental pollution. Pt. 2

    International Nuclear Information System (INIS)

    Brosche, D.

    1983-01-01

    Direct and indirect dry recirculation cooling, wet cooling tower, natural-draught wet cooling tower, combined cooling processes, hybrid cooling systems, cell cooling systems, auxiliary water preparation, cooling process design, afterheat removal in nuclear power plants, environmental effects, visible plumes as a function of weather conditions, environmental protection and energy supply assurance. (orig.) [de

  2. Annual report on the environmental radiation monitoring around Tokai Reprocessing Plant. FY 2001. Document on present state of affairs

    International Nuclear Information System (INIS)

    Shinohara, Kunihiko; Takeishi, Minoru; Miyagawa, Naoto

    2002-06-01

    Environmental radiation monitoring around the Tokai Reprocessing Plant has been performed since 1975, based on ''Safety Regulations for the Tokai Reprocessing Plant, Chapter IV - Environmental Monitoring''. This annual report presents the results of the environmental monitoring and the dose estimation to the hypothetical inhabitant due to the radioactivity discharged from the plant during April 2001 to March 2002. Appendices present comprehensive information, such as monitoring program, monitoring results, meteorological data and annual discharges from the plant. (author)

  3. Environmental radioactivity survey data in Cheonju

    International Nuclear Information System (INIS)

    Lee, Mo Sung; Goo, Hyun Mi

    2003-12-01

    We surveyed the en environmental radiation and radioactivity in Chungcheongbuk-do in order to provide baseline data in the year of 2003. Data generated from the project will be the information base for making decisions necessary to ensure the protection of public health. This report contains the data of gamma exposure rates and radioactivities of airborne dust, fallout, precipitation and tap water which were analyzed periodically by Cheongju regional monitoring station In the year 2003. Also it contains the data of natural radioactivity levels of environmental samples such as soil, drinking water, indicator plant(mugwort, pine-needle), agricultural and forest products, and processed food(tea)

  4. Environmental radioactivity survey data in Cheonju

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Mo Sung; Goo, Hyun Mi [Cheongju Univ., Cheongju (Korea, Republic of)

    2003-12-15

    We surveyed the en environmental radiation and radioactivity in Chungcheongbuk-do in order to provide baseline data in the year of 2003. Data generated from the project will be the information base for making decisions necessary to ensure the protection of public health. This report contains the data of gamma exposure rates and radioactivities of airborne dust, fallout, precipitation and tap water which were analyzed periodically by Cheongju regional monitoring station In the year 2003. Also it contains the data of natural radioactivity levels of environmental samples such as soil, drinking water, indicator plant(mugwort, pine-needle), agricultural and forest products, and processed food(tea)

  5. Environmental monitoring at the Forsmark nuclear power plant

    International Nuclear Information System (INIS)

    Sandstroem, O.

    1991-01-01

    The use of cooling water at such large power plants as Forsmark creates a considerable hazard for fish in the intake area, as they may be transported into the plant and killed. Several millions of Baltic herring and three-spined stickleback are lost each year at the intake screens. A release of cooling water to an open sea area is generally considered as a minor environmental problem, a presumption so far not contradicated by the results from the monitoring studies at Forsmark. In the Biotest basin, however, where the exposure to heat is maximal, a long series of effects ultimately changing populations of plants, benthic animals and fish have been documented. One important conclusion after ten years of studies in a heated Biotest basin, is that ecosystem stability seems to need very long time to be established, if it ever will. The monitoring of radioactivity controls the quality of the fish as food but is also directed to select special species accumulating these elements, bladder wrack etc. At Forsmark only small amounts of radionuclides from the plant so far have been detected in the marine environment. (KAE)

  6. 40 CFR 80.1285 - How does a refiner apply for a benzene baseline?

    Science.gov (United States)

    2010-07-01

    ... baseline? 80.1285 Section 80.1285 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... (abt) Program § 80.1285 How does a refiner apply for a benzene baseline? (a) A benzene baseline... credits. (b) For U.S. Postal delivery, the benzene baseline application shall be sent to: Attn: MSAT2...

  7. Novel roles for genetically modified plants in environmental protection

    Czech Academy of Sciences Publication Activity Database

    Macek, Tomáš; Kotrba, Pavel; Svatoš, Aleš; Nováková, Martina; Demnerová, K.; Macková, Martina

    2008-01-01

    Roč. 26, č. 3 (2008), s. 146-152 ISSN 0167-7799 R&D Projects: GA AV ČR IAA4055204; GA MŠk 1M06030 Institutional research plan: CEZ:AV0Z40550506 Keywords : transgenic plant * environmental protection * insect pheromone * phytoremediation Subject RIV: EI - Biotechnology ; Bionics Impact factor: 6.624, year: 2008

  8. Postremediation monitoring program baseline assessment report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Greeley, M.S. Jr.; Ashwood, T.L.; Kszos, L.A.; Peterson, M.J.; Rash, C.D.; Southworth, G.R.; Phipps, T.L.

    1998-04-01

    Lower East Fork Poplar Creek (LEFPC) and its floodplain are contaminated with mercury (Hg) from ongoing and historical releases from the US Department of Energy (DOE) Oak Ridge Y-12 Plant. A remedial investigation and feasibility study of LEFPC resulted in the signing of a Record of Decision (ROD) in August 1995. In response to the ROD, soil contaminated with mercury above 400 mg/kg was removed from two sites in LEFPC and the floodplain during a recently completed remedial action (RA). The Postremediation Monitoring Program (PMP) outlined in the LEFPC Monitoring Plan was envisioned to occur in two phases: (1) a baseline assessment prior to remediation and (2) postremediation monitoring. The current report summarizes the results of the baseline assessment of soil, water, biota, and groundwater usage in LEFPC and its floodplain conducted in 1995 and 1996 by personnel of the Oak Ridge National Laboratory Biological Monitoring and Abatement Program (BMAP). This report also includes some 1997 data from contaminated sites that did not undergo remediation during the RA (i.e., sites where mercury is greater than 200 mg/kg but less than 400 mg/kg). The baseline assessment described in this document is distinct and separate from both the remedial investigation/feasibility study the confirmatory sampling conducted by SAIC during the RA. The purpose of the current assessment was to provide preremediation baseline data for the LEFPC PMP outlined in the LEFPC Monitoring Plan, using common approaches and techniques, as specified in that plan

  9. Postremediation monitoring program baseline assessment report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Greeley, M.S. Jr.; Ashwood, T.L.; Kszos, L.A.; Peterson, M.J.; Rash, C.D.; Southworth, G.R. [Oak Ridge National Lab., TN (United States); Phipps, T.L. [CKY, Inc. (United States)

    1998-04-01

    Lower East Fork Poplar Creek (LEFPC) and its floodplain are contaminated with mercury (Hg) from ongoing and historical releases from the US Department of Energy (DOE) Oak Ridge Y-12 Plant. A remedial investigation and feasibility study of LEFPC resulted in the signing of a Record of Decision (ROD) in August 1995. In response to the ROD, soil contaminated with mercury above 400 mg/kg was removed from two sites in LEFPC and the floodplain during a recently completed remedial action (RA). The Postremediation Monitoring Program (PMP) outlined in the LEFPC Monitoring Plan was envisioned to occur in two phases: (1) a baseline assessment prior to remediation and (2) postremediation monitoring. The current report summarizes the results of the baseline assessment of soil, water, biota, and groundwater usage in LEFPC and its floodplain conducted in 1995 and 1996 by personnel of the Oak Ridge National Laboratory Biological Monitoring and Abatement Program (BMAP). This report also includes some 1997 data from contaminated sites that did not undergo remediation during the RA (i.e., sites where mercury is greater than 200 mg/kg but less than 400 mg/kg). The baseline assessment described in this document is distinct and separate from both the remedial investigation/feasibility study the confirmatory sampling conducted by SAIC during the RA. The purpose of the current assessment was to provide preremediation baseline data for the LEFPC PMP outlined in the LEFPC Monitoring Plan, using common approaches and techniques, as specified in that plan.

  10. Environmental Survey preliminary report, Kansas City Plant, Kansas City, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE), Kansas City Plant (KCP), conducted March 23 through April 3, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the KCP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data observations of the operations performed at the KCP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the KCP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the KCP Survey. 94 refs., 39 figs., 55 tabs.

  11. Environmental Survey preliminary report, Kansas City Plant, Kansas City, Missouri

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE), Kansas City Plant (KCP), conducted March 23 through April 3, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the KCP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data observations of the operations performed at the KCP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the KCP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the KCP Survey. 94 refs., 39 figs., 55 tabs

  12. Environmental impact of fossil fuel utilization in the thermal power plant

    International Nuclear Information System (INIS)

    Ghasem D Najafpour; Seyed Jafar Mehdizadeh; Abdul Rahman Mohamed

    2000-01-01

    Carbon dioxide causes green house effect, has been considered as a pollutant source of our safe environment. Since combustion of fossil fuel may create tremendous amount of carbon dioxide, detecting any pollutant sources would be important to eliminate the pollution sources. Evaluation of smoke dispersion that has been generated by a power plant utilizing fossil fuel is the objective of this paper. The concentration of NO, and SO, in the soil, have been analyzed from a distance of 3 to 4 km far from power plant. The experimental results shown. that the concentration of toxic gases was a little above the international standards. Replacement of fossil fuel by natural gas caused NO, concentration to be developed in the atmosphere, therefore usage of natural gas is limited by environmental protection agencies. Beside the nuclear power plant, the power generated by other sources. are limited. Electric power generated by water dam is not a major contribution of electric power demand. Therefore generation of electricity by any other energy sources, which are friendly to the environment, is recommended. Other sources of energy, such as wind power, solar energy, geothermal, ocean thennal and renewable source of energy can be considered safe for the environment. The goal of environmental management system would be to meet the minimum requirements were established and demanded by the local environmental protection agency or international standard organization (ISO-14000). (Author)

  13. TAPIR--Finnish national geochemical baseline database.

    Science.gov (United States)

    Jarva, Jaana; Tarvainen, Timo; Reinikainen, Jussi; Eklund, Mikael

    2010-09-15

    In Finland, a Government Decree on the Assessment of Soil Contamination and Remediation Needs has generated a need for reliable and readily accessible data on geochemical baseline concentrations in Finnish soils. According to the Decree, baseline concentrations, referring both to the natural geological background concentrations and the diffuse anthropogenic input of substances, shall be taken into account in the soil contamination assessment process. This baseline information is provided in a national geochemical baseline database, TAPIR, that is publicly available via the Internet. Geochemical provinces with elevated baseline concentrations were delineated to provide regional geochemical baseline values. The nationwide geochemical datasets were used to divide Finland into geochemical provinces. Several metals (Co, Cr, Cu, Ni, V, and Zn) showed anomalous concentrations in seven regions that were defined as metal provinces. Arsenic did not follow a similar distribution to any other elements, and four arsenic provinces were separately determined. Nationwide geochemical datasets were not available for some other important elements such as Cd and Pb. Although these elements are included in the TAPIR system, their distribution does not necessarily follow the ones pre-defined for metal and arsenic provinces. Regional geochemical baseline values, presented as upper limit of geochemical variation within the region, can be used as trigger values to assess potential soil contamination. Baseline values have also been used to determine upper and lower guideline values that must be taken into account as a tool in basic risk assessment. If regional geochemical baseline values are available, the national guideline values prescribed in the Decree based on ecological risks can be modified accordingly. The national geochemical baseline database provides scientifically sound, easily accessible and generally accepted information on the baseline values, and it can be used in various

  14. Evaluation of environmental data relating to selected nuclear power plant sites. Kewaunee Nuclear Power Plant site

    International Nuclear Information System (INIS)

    Murarka, I.P.; Ferrante, J.G.; Policastro, A.J.; Daniels, E.W.

    1976-08-01

    Environmental monitoring data for the years 1973, 1974 and 1975 pertaining to the Kewaunee Plant, which began operation in mid-1974, were analyzed by qualitative and quantitative methods. The results showed no significant immediate deleterious effects, thus confirming preoperational predictions. Although the plant has not operated long enough to reveal long-term deleterious effects, the present indications do not lead to a prediction that any are developing. The data acquired, method of analysis, and results obtained are presented in detail along with recommendations for improving monitoring techniques

  15. Environmental impact assessment of decommissioning treatment about radioactive model plant waste ore storage site

    International Nuclear Information System (INIS)

    Bei Xinyu

    2012-01-01

    Aiming at decommissioning treatment project of radioactive model plant waste ore storage site, based on the detailed investigations of source terms and project description, systematic environmental impacts have been identified. The environmental impacts both during decommissioning treatment, radioactive waste transportation and after treatment are assessed. Some specific environmental protection measures are proposed so as to minimize the adverse environmental impacts. (author)

  16. Symposium on operational and environmental issues concerning use of water as a coolant in power plants and industries: proceedings

    International Nuclear Information System (INIS)

    2008-12-01

    The symposium is organised to bring together researchers, plant operators and regulatory agencies working in the area of operational and environmental problems associated with use of water as a coolant in power plants and other allied industries. The symposium targets chemists, biologists, environmental scientists, power plant operating engineers and plant designers working in various academic, governmental and non-governmental organisations. The major themes of the symposium are: water chemistry of coolant systems in power plants and other industries, chemistry of primary and moderator systems in nuclear power plants and research reactors, corrosion issues including Flow-Accelerated Corrosion (FAC) and its control in water coolant systems, chemistry of steam and water at elevated temperature in nuclear power plants, once through steam generator chemistry, industrial fire water systems, ion-exchange purification, innovative water treatment in power and industrial units, chemical cleaning and chemical decontamination, biofouling and biocorrosion, cooling water treatment chemicals and their environmental fate and environmental impact of thermal effluents. Papers relevant to INIS are indexed separately

  17. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    International Nuclear Information System (INIS)

    2006-01-01

    This Biennial Environmental Compliance Report (BECR) documents compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste. This BECR covers the reporting period from April 1, 2004, to March 31, 2006. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents United States (U.S.) Department of Energy (DOE) compliance with regulations and permits issued pursuant to the following: (1) Title 40 Code of Federal Regulations (CFR) Part 191, Subpart A, 'Environmental Standards for Management and Storage'; (2) Clean Air Act (CAA) (42 United States Code [U.S.C.] 7401, et seq.); (3) Solid Waste Disposal Act (SWDA) (42 U.S.C. 6901-6992, et seq.); (4) Safe Drinking Water Act (SDWA) (42 U.S.C. 300f, et seq.); (5) Toxic Substances Control Act (TSCA) (15 U.S.C. 2601, et seq.); (6) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. 9601, et seq.); and all other federal and state of New Mexico laws pertaining to public health and safety or the environment.

  18. Environmental risk assessment for plant pests: a procedure to evaluate their impacts on ecosystem services.

    Science.gov (United States)

    Gilioli, G; Schrader, G; Baker, R H A; Ceglarska, E; Kertész, V K; Lövei, G; Navajas, M; Rossi, V; Tramontini, S; van Lenteren, J C

    2014-01-15

    The current methods to assess the environmental impacts of plant pests differ in their approaches and there is a lack of the standardized procedures necessary to provide accurate and consistent results, demonstrating the complexity of developing a commonly accepted scheme for this purpose. By including both the structural and functional components of the environment threatened by invasive alien species (IAS), in particular plant pests, we propose an environmental risk assessment scheme that addresses this complexity. Structural components are investigated by evaluating the impacts of the plant pest on genetic, species and landscape diversity. Functional components are evaluated by estimating how plant pests modify ecosystem services in order to determine the extent to which an IAS changes the functional traits that influence ecosystem services. A scenario study at a defined spatial and temporal resolution is then used to explore how an IAS, as an exogenous driving force, may trigger modifications in the target environment. The method presented here provides a standardized approach to generate comparable and reproducible results for environmental risk assessment as a component of Pest Risk Analysis. The method enables the assessment of overall environmental risk which integrates the impacts on different components of the environment and their probabilities of occurrence. The application of the proposed scheme is illustrated by evaluating the environmental impacts of the invasive citrus long-horn beetle, Anoplophora chinensis. © 2013.

  19. Environmental Audit of the Grand Junction Projects Office

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  20. Environmental Audit of the Grand Junction Projects Office

    International Nuclear Information System (INIS)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs

  1. Baseline effects on carbon footprints of biofuels: The case of wood

    International Nuclear Information System (INIS)

    Johnson, Eric; Tschudi, Daniel

    2012-01-01

    As biofuel usage has boomed over the past decade, so has research and regulatory interest in its carbon accounting. This paper examines one aspect of that carbon accounting: the baseline, i.e. the reference case against which other conditions or changes can be compared. A literature search and analysis identified four baseline types: no baseline; reference point; marginal fossil fuel; and biomass opportunity cost. The fourth one, biomass opportunity cost, is defined in more detail, because this is not done elsewhere in the literature. The four baselines are then applied to the carbon footprint of a wood-fired power plant. The footprint of the resulting wood-fired electricity varies dramatically, according to the type of baseline. Baseline type is also found to be the footprint's most significant sensitivity. Other significant sensitivities are: efficiency of the power plant; the growth (or re-growth) rate of the forest that supplies the wood; and the residue fraction of the wood. Length of the policy horizon is also an important factor in determining the footprint. The paper concludes that because of their significance and variability, baseline choices should be made very explicit in biofuel carbon footprints. - Highlights: ► Four baseline types for biofuel footprinting are identified. ► One type, ‘biomass opportunity cost’, is defined mathematically and graphically. ► Choice of baseline can dramatically affect the footprint result. ► The ‘no baseline’ approach is not acceptable. ► Choice between the other three baselines depends on the question being addressed.

  2. Guidance on the environmental risk assessment of genetically modified plants

    DEFF Research Database (Denmark)

    Bartsch, Detlef; Chueca, Cristina; De-Schrijver, Adinda

    risk evaluation. The scientific Panel on Genetically Modified Organisms (of the European Food Safety Authority (EFSA GMO Panel) considers seven specific areas of concern to be addressed by applicants and risk assessors during the ERA (1) persistence and invasiveness of the GM plant , or its compatible......This document provides guidance for the environmental risk assessment (ERA) of genetically modified (GM) plants submitted within the framework of Regulation (EC) No. 1829/2003 on GM food and feed or under Directive 2001/18/EC on the deliberate release into the environment of genetically modified...... organisms (GMOs). This document provides guidance for assessing potential effects of GM plants on the environment and the rationales for the data requirements for a comprehensive ERA of GM plants. The ERA should be carried out on a case-by-case basis, following a step-by-step assessment approach...

  3. Shifted Baselines Reduce Willingness to Pay for Conservation

    Directory of Open Access Journals (Sweden)

    Loren McClenachan

    2018-02-01

    Full Text Available A loss of memory of past environmental degradation has resulted in shifted baselines, which may result in conservation and restoration goals that are less ambitious than if stakeholders had a full knowledge of ecosystem potential. However, the link between perception of baseline states and support for conservation planning has not been tested empirically. Here, we investigate how perceptions of change in coral reef ecosystems affect stakeholders' willingness to pay (WTP for the establishment of protected areas. Coral reefs are experiencing rapid, global change that is observable by the public, and therefore provide an ideal ecosystem to test links between beliefs about baseline states and willingness to support conservation. Our survey respondents perceived change to coral reef communities across six variables: coral abundance, fish abundance, fish diversity, fish size, sedimentation, and water pollution. Respondants who accurately perceived declines in reef health had significantly higher WTP for protected areas (US $256.80 vs. $102.50 per year, suggesting that shifted baselines may reduce engagement with conservation efforts. If WTP translates to engagement, this suggests that goals for restoration and recovery are likely to be more ambitious if the public is aware of long term change. Therefore, communicating the scope and depth of environmental problems is essential in engaging the public in conservation.

  4. Environmental aspects of Greenfield NPP site in northern Finland

    International Nuclear Information System (INIS)

    Kopisto, L.

    2015-01-01

    Fennovoima will build a nuclear power plant of 1200 MW at Hanhikivi headland in Pyhaejoki, Northern Finland on the shore of the Baltic Sea. According to the target schedule the plant will produce electricity in 2024. The plant supplier is Rusatom Overseas, subsidiary of the Russian Rosatom. No industrial activity is practiced in the immediate surroundings of the site area and the headland and its surroundings are sparsely populated. The area is in its natural state. This means that all the preparatory and infrastructure works needs to be done before the construction of NPP can start. The environmental and nature conservation aspects have to be taken into consideration in planning, construction and operation of the NPP. Northern location sets some challenges to the design of the power plant. The sea area is normally covered with ice almost half of the year which has to be taken into account in the design of the power plant. But there are also advantages: in winter when the cooling water is cold the efficiency of electricity production is estimated to be exceptionally good, approximately 39 %. Since 2008, Fennovoima has carried out several environmental studies and surveys in the site area and has collected information about the nature conditions on land and in the sea area. The collected environmental data has been utilized in land use planning, environmental impact assessment procedure and in applying for conventional permits. The environmental data can also be used as baseline data. The document is composed of an abstract and the presentation slides

  5. 78 FR 79658 - Okanagan Specialty Fruits, Inc.; Availability of Plant Pest Risk Assessment and Environmental...

    Science.gov (United States)

    2013-12-31

    ..., DC, this 20th day of December 2013. Kevin Shea, Administrator, Animal and Plant Health Inspection... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0025] Okanagan Specialty Fruits, Inc.; Availability of Plant Pest Risk Assessment and Environmental Assessment...

  6. Environmental Drivers of Patterns of Plant Diversity Along a Wide Environmental Gradient in Korean Temperate Forests

    Directory of Open Access Journals (Sweden)

    Chang-Bae Lee

    2016-01-01

    Full Text Available Understanding patterns of biodiversity and their drivers along environmental gradients is one of the central topics in ecology. However, whether diversity patterns along environmental gradients differ among diversity components as well as life forms and what kind of variables control or interact to shape the diversity patterns are poorly known. This study scrutinized the distribution patterns of three plant groups with four diversity indices and evaluated the effects of regional area, topography, topographic heterogeneity, climate, primary productivity, vegetation structure diversity and vegetation type diversity along an extensive elevational gradient on the Baekdudaegan Mountains in South Korea. Different elevational patterns, including hump-shaped, reversed hump-shaped, increasing, multimodal and no relationship, were observed among both the diversity indices and the plant groups. Regional area, habitat heterogeneity and climate were included to explain most of the elevational diversity patterns. In particular, habitat heterogeneity was the most important variable for explaining the patterns of diversity. The results suggest that patterns of elevational diversity may differ not only among plant groups but also among diversity indices and that such patterns are primarily caused by habitat heterogeneity in the Baekdudaegan Mountains because more heterogeneous and diverse habitats can support more coexisting species.

  7. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones

  8. Environmental management systems implemented in the Spanish nuclear power plants; Sistemas de gestion ambiental implantados en las centrales nucleares espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Redondo, R.; Fernandez Guisado, M. B.; Hortiguela, R.; Bustamante, L. F.; Esparza, J. L.; Villareal, M.; Yague, F.

    2013-09-01

    The companies that own the Spanish Nuclear Power Plants, aware of social concern and in the context of a growing demanding environmental legislation, have a permanent commitment to the electricity production based on the principles of a maximum respect for the environment, safety, quality, professionalism and continuous improvement. In order to minimize the environmental impact of their plants they have implemented and Environmental Management System based on the ISO 14001 Standard. They minimize the environmental impact by identifying the significant environmental aspects and defining the corresponding objectives. This article describes the referred environmental management systems and their environmental objectives, as applied and defined by the Spanish Nuclear Power Plants. (Author)

  9. An environmental report for the first Israeli nuclear power plant

    International Nuclear Information System (INIS)

    Velner, S.

    1977-01-01

    At the end of 1974, following general activity in planning the nuclear power plant, the need for an Environment Report (ER) for that plant came up. The ER should concentrate mainly on the quality of life, while the Licensing Division of the IAEC is the body that supervises all the aspects of the ''safety of life''. The conclusions about the ER role can be summarized thus: it should be based on the American format adjusted to Israeli conditions, a separation between Safety of life and Quality of life factors will be utilized. The ER should deal with safety subjects only at a minimal level, the ER will deal with several alternate sites, most of information would be based on existing knowledge. These four principles are further developed in the content of the ER. Chapters of the ER: need of power, need of nuclear energy, siting of the nuclear plant, site comparison - demography and land and water use, site comparison - physical and ecological conditions, selection of site to be recommended, the nuclear plant, environmental impacts of the nuclear plant, the nuclear plant in the framework of overall Master plant for development of Electrical power. (B.G.)

  10. Environmental assessment. Y-12 Plant Site, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1982-12-01

    The Oak Ridge Y-12 Plant, operated by Union Carbide Corporation, Nuclear Division, under contract to the US Department of Energy (DOE), has the following five major responsibilities: production of nuclear weaposn components; fabrication support for weapon design agencies; support for other UCC-ND installations; support and assistance to otehr government agencies; and processing of source and special nuclear materials. This Environmental Assessment describesthe ongoing opertions of Y-12 and evaluates the actual and possible impacts on the environment that continuation of these operatios entails. Information is presented under the following section headings: purpose and need for the proposed action; alternatives; affected environment;; and, environmental consequences

  11. Baseline effects on carbon footprints of biofuels: The case of wood

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Eric, E-mail: johnsonatlantic@gmail.com [Atlantic Consulting, 8136 Gattikon (Switzerland); Tschudi, Daniel [ETH, Berghaldenstrasse 46, 8800 Thalwil (Switzerland)

    2012-11-15

    As biofuel usage has boomed over the past decade, so has research and regulatory interest in its carbon accounting. This paper examines one aspect of that carbon accounting: the baseline, i.e. the reference case against which other conditions or changes can be compared. A literature search and analysis identified four baseline types: no baseline; reference point; marginal fossil fuel; and biomass opportunity cost. The fourth one, biomass opportunity cost, is defined in more detail, because this is not done elsewhere in the literature. The four baselines are then applied to the carbon footprint of a wood-fired power plant. The footprint of the resulting wood-fired electricity varies dramatically, according to the type of baseline. Baseline type is also found to be the footprint's most significant sensitivity. Other significant sensitivities are: efficiency of the power plant; the growth (or re-growth) rate of the forest that supplies the wood; and the residue fraction of the wood. Length of the policy horizon is also an important factor in determining the footprint. The paper concludes that because of their significance and variability, baseline choices should be made very explicit in biofuel carbon footprints. - Highlights: Black-Right-Pointing-Pointer Four baseline types for biofuel footprinting are identified. Black-Right-Pointing-Pointer One type, 'biomass opportunity cost', is defined mathematically and graphically. Black-Right-Pointing-Pointer Choice of baseline can dramatically affect the footprint result. Black-Right-Pointing-Pointer The 'no baseline' approach is not acceptable. Black-Right-Pointing-Pointer Choice between the other three baselines depends on the question being addressed.

  12. Improvements done at Heavy Water Plant (Manuguru) to increase the standards of environmental protection

    International Nuclear Information System (INIS)

    Rama Rao, V.V.S.; Gupta, R.V.; Pandey, B.L.

    1997-01-01

    The Heavy Water Plant at Manuguru is designed to produce 185 MTY of nuclear grade heavy water based on bithermal H 2 S-H 2 O exchange process and handles large inventory of H 2 S gas (about 400 MT). As H 2 S gas is very toxic, corrosive and hazardous in nature, extreme care has been taken in the design of plant, selection of equipment and materials adhering to stringent fabrication procedures and codes to ensure the production of heavy water in a safe manner. This paper highlights the improvements done at Heavy Water Plant (Manuguru) to increase the standards of environmental protection. The safety assessment of a hazardous plant is a continuous process. Apart from the extreme care taken in the design, construction, commissioning and operation of the plant, review of each and every safety related unusual occurrence by various levels of review committees as stipulated and speedy implementation of the recommendations goes in a long way in increasing the standards of environmental protection

  13. The potential environmental impacts and the siting of proposed nuclear power plants in China

    International Nuclear Information System (INIS)

    Shi Zhongqi

    1986-01-01

    This paper reviews briefly the methodology of assessing environmental impacts from the nuclear power plants and analyses the potential radiological impacts on the environment from proposed nuclear power plants in China. Preliminary studies show that the environmental impacts of the effluents of routine release from PWRs to the proposed sites are extremely small, even if nuclear power plants are constructed either on the Bohai Sea shore with a narrow mouth or in the densely populated regions of Sunan. Thus, the suitability of sites depends mainly on the acceptability of possible exposure to the residents following postulated accidental release of radioactive materials. The paper also discusses relations between the nuclear plant siting and population distribution around the site and compares the distribution of the proposed sites in China with that of other countries sites in according to China actual situation, it is reasonable to adopt a prudent policy that the first series of nuclear power plants in China should be built in relatively low population areas

  14. Pinellas Plant environmental monitoring report, 1981

    International Nuclear Information System (INIS)

    1982-03-01

    The effluent and environmental monitoring programs maintained by the Pinellas Plant are designed to determine the efficiencies of treatment and control mechanisms, to provide measurements of discharge concentrations for comparison with applicable standards, and to assess the concentrations of these discharges in the environment. Small quantities of tritium gas, tritium oxide, carbon-14 labeled solvent and krypton-85 gas were released from the plant during the year. Average maximum ground level concentrations of these radioisotopes were all significantly less than 1/10 of 1% of the standard for continuous nonoccupational exposure. Off-site releases of liquid effluents were analyzed for compliance with the National Pollutant Discharge Elimination System (NPDES) permit issued for this site. Analyses were performed for biochemical oxygen demand, suspended solids, fecal coliform bacteria, pH, nitrogen, phosphorus, arsenic, chlorides, chromium, copper, cyanides, detergents, fluorides, iron, lead, mercury, oil plus greases, phenols, turbidity and zinc. Excursions above permit limits were experienced in the results for suspended solids, fecal coliforms, iron and mercury. In addition to the non-radioactive parameters listed, a small quantity of radioactive tritium oxide was released in the effluent. Analyses showed the average concentration was 0.43% of the nonoccupational standard. Site perimeter and off-site air samples for tritium gas and tritium oxide, as well as off-site surface water samples obtained to distance of 9.6 kilometers from the plant site and analyzed for tritium content, showed levels significantly less than 1/10 of 1% of the standard for continuous nonoccupational exposure. Calculation were made to determine the radiation doses resulting from releases of tritium oxide, krypton-85 and carbon-14 to: an individual at the site boundary; individuals in the closest residential area; and the population within 80 kilometers (50 miles) of the plant site

  15. 78 FR 47272 - Monsanto Co.; Availability of Plant Pest Risk Assessment and Environmental Assessment for...

    Science.gov (United States)

    2013-08-05

    ..., DC, this 31st day of July 2013. Kevin Shea, Administrator, Animal and Plant Health Inspection Service... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0020] Monsanto Co.; Availability of Plant Pest Risk Assessment and Environmental Assessment for Determination of...

  16. Deep repository and encapsulation plant for spent nuclear fuel. Consultation and environmental impact assessment according to the Environmental Code and the Nuclear Activities Act

    International Nuclear Information System (INIS)

    2002-11-01

    As a part of its programme for siting of a deep repository for spent nuclear fuel, SKB has recently commenced site investigations at Forsmark in Oesthammar Municipality and at Simpevarp in Oskarshamn Municipality. At the same time, SKB has initiated the consultation process prior to application for permits/licences under the Environmental Code and the Nuclear Activities Act. Early consultation has been carried out for both sites, and a consultation report has been submitted to the county administrative boards in Kalmar County and Uppsala County for decisions regarding significant environmental impact. After decisions by the county administrative boards, SKB will commence the work with environmental impact assessment and extended consultation. SKB's main alternative for the encapsulation plant is siting adjacent to CLAB. In the spring of 2003, SKB will convene early consultation on the encapsulation plant. This will be followed by extended consultation up to 2005. This process will be coordinated with the extended consultation for a deep repository in Oskarshamn. An alternative is to locate the encapsulation plant at a deep repository at Forsmark. This alternative is being dealt with completely within the extended consultation for the deep repository at Forsmark. Three different permits/licences are required for both the encapsulation plant and the deep repository: a permit under the Environmental Code, a licence under the Nuclear Activities Act, and a building permit under the Planning and Building Act. Licensing under the Environmental Code and the Nuclear Activities Act takes place in parallel. The applications under both laws must include an environmental impact statement (EIS) prepared according to the rules in Chapter 6 of the Environmental Code. The same EIS is thus used in both applications. Separate EISs are prepared for the encapsulation plant and the deep repository. According to the Environmental Code, the consultation shall relate to the location, scope

  17. Risk information in support of cost estimates for the Baseline Environmental Management Report (BEMR). Section 1

    International Nuclear Information System (INIS)

    Gelston, G.M.; Jarvis, M.F.; Warren, B.R.; Von Berg, R.

    1995-06-01

    The Pacific Northwest Laboratory (PNL)(1) effort on the overall Baseline Environmental Management Report (BEMR) project consists of four installation-specific work components performed in succession. These components include (1) development of source terms, 92) collection of data and preparation of environmental settings reports, (3) calculation of unit risk factors, and (4) utilization of the unit risk factors in Automated Remedial Action Methodology (ARAM) for computation of target concentrations and cost estimates. This report documents work completed for the Nevada Test Site, Nevada, for components 2 and 3. The product of this phase of the BEMR project is the development of unit factors (i.e., unit transport factors, unit exposure factors, and unit risk factors). Thousands of these unit factors are gene rated and fill approximately one megabyte of computer information per installation. The final unit risk factors (URF) are transmitted electronically to BEMR-Cost task personnel as input to a computer program (ARAM). Abstracted files and exhibits of the URF information are included in this report. These visual formats are intended to provide a sample of the final task deliverable (the URF files) which can be easily read without a computer

  18. Analysis in environmental radioactivity around Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Yong Woo; Han, Man Jung; Cho, Seong Won; Cho, Hong Jun; Oh, Hyeon Kyun; Lee, Jeong Min; Chang, Jae Sook [KORTIC, Taejon (Korea, Republic of)

    2003-12-15

    Twelve kinds of environmental samples such as soil, seawater, underground water, etc. around Nuclear Power Plants(NPPs) were collected. Tritium chemical analysis was tried for the samples of rain water, pine-needle, air, seawater, underground water, chinese cabbage, again of rice and milk sampled around NPPs, and surface seawater and rain water sampled over the country. Strontium in the soil that were sampled at 60 point of district in Korea were analyzed. Tritium were analyzed in 21 samples of surface seawater around the Korea peninsular that were supplied form KFRDI(National Fisheries Research and Development Institute). Sampling and chemical analysis environmental samples around Kori, Woolsung, Youngkwang, Wooljin NPPs and Taeduk science town for tritium and strontium analysis was managed according to plans. Succeed to KINS after all samples were tried.

  19. Photosynthesis, environmental change, and plant adaptation: Research topics in plant molecular ecology. Summary report of a workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    As we approach the 21st Century, it is becoming increasingly clear that human activities, primarily related to energy extraction and use, will lead to marked environmental changes at the local, regional, and global levels. The realized and the potential photosynthetic performance of plants is determined by a combination of intrinsic genetic information and extrinsic environmental factors, especially climate. It is essential that the effects of environmental changes on the photosynthetic competence of individual species, communities, and ecosystems be accurately assessed. From October 24 to 26, 1993, a group of scientists specializing in various aspects of plant science met to discuss how our predictive capabilities could be improved by developing a more rational, mechanistic approach to relating photosynthetic processes to environmental factors. A consensus emerged that achieving this goal requires multidisciplinary research efforts that combine tools and techniques of genetics, molecular biology, biophysics, biochemistry, and physiology to understand the principles, mechanisms, and limitations of evolutional adaptation and physiological acclimation of photosynthetic processes. Many of these basic tools and techniques, often developed in other fields of science, already are available but have not been applied in a coherent, coordinated fashion to ecological research. The efforts of this research program are related to the broader efforts to develop more realistic prognostic models to forecast climate change that include photosynthetic responses and feedbacks at the regional and ecosystem levels.

  20. Listeria monocytogenes contamination in dairy plants: evaluation of Listeria monocytogenes environmental contamination in two cheese-making plants using sheeps milk

    Directory of Open Access Journals (Sweden)

    Michela Ibba

    2013-09-01

    Full Text Available Listeria monocytogenes harbouring niches established in the processing plant support post-process contamination of dairy products made from pasteurised or thermised milk. The present study investigated L. monocytogenes environmental contamination in two sheep’s milk cheese-making plants. Persistence of contamination in the area at higher risk was also investigated. During a one-year survey 7 samplings were carried out in each dairy plant, along the production lines of Pecorino Romano and ricotta salata cheese. A total of 613 environmental samples collected from food contact and non-food contact surfaces were analysed according to ISO 11290-1:2005 standard method. Identification of the isolated strains was carried out by polymerase chain reaction. L. monocytogenes prevalence was 23.2% in dairy A and 13.1% in dairy B, respectively. The higher prevalence rate was found in the following areas: salting, products washing, packaging, ricotta salata storage and Pecorino Romano ripening rooms. L. monocytogenes was never found in the cheese-making area. The probability of observing samples positive for the presence of L. monocytogenes was asso- ciated with dairy plant, sampling area and the period of cheese-making (P<0.001. The greater persistence of contamination over time was observed in the washing, salting, and Pecorino Romano ripening areas. The control of persistent environmental contamination relies on the identification of L. monocytogenes niches within the processing environment and the prevention of harborage sites formation. The importance of strict cleaning and sanitising procedure in controlling L. monocytogenes environmental contamination is confirmed by the lower level of contamination observed after these procedures were correctly implemented.

  1. 76 FR 37770 - Monsanto Co.; Availability of Petition, Plant Pest Risk Assessment, and Environmental Assessment...

    Science.gov (United States)

    2011-06-28

    ...] Monsanto Co.; Availability of Petition, Plant Pest Risk Assessment, and Environmental Assessment for... available for public comment the Monsanto petition, our plant pest risk assessment, and our draft... plant pest risk assessment are also available on the APHIS Web site at: http://www.aphis.usda.gov/brs...

  2. Several issues related to regional environmental investigation to inland nuclear power plant

    International Nuclear Information System (INIS)

    Tian Xinshan; Zhang Xiaofeng

    2010-01-01

    Based on the goal of carrying out regional environmental investigation and review of recent environmental investigations toward inland nuclear power plant(NPP) site, and combined with the characteristics between inland and coastal sites, this paper is to make deeply analysis on population distribution, environmental characteristics, feasibility of performing emergency plan, characteristics of received water and external human-induced incident of NPP vicinity, then advance several significant issues related regional environmental investigation to inland sites, and make comparison with the investigation to coastal sites. Meantime, on guarantee of the integrity of collected materials during investigation, this paper also makes several proposals to provide reference for carrying out regional environmental investigation to inland NPP site. (authors)

  3. Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  4. Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  5. Environmental sustainability assessment of hydropower plant in Europe using life cycle assessment

    Science.gov (United States)

    Mahmud, M. A. P.; Huda, N.; Farjana, S. H.; Lang, C.

    2018-05-01

    Hydropower is the oldest and most common type of renewable source of electricity available on this planet. The end of life process of hydropower plant have significant environmental impacts, which needs to be identified and minimized to ensure an environment friendly power generation. However, identifying the environmental impacts and health hazards are very little explored in the hydropower processing routes despite a significant quantity of production worldwide. This paper highlight the life-cycle environmental impact assessment of the reservoir based hydropower generation system located in alpine and non-alpine region of Europe, addressing their ecological effects by the ReCiPe and CML methods under several impact-assessment categories such as human health, ecosystems, global warming potential, acidification potential, etc. The Australasian life-cycle inventory database and SimaPro software are utilized to accumulate life-cycle inventory dataset and to evaluate the impacts. The results reveal that plants of alpine region offer superior environmental performance for couple of considered categories: global warming and photochemical oxidation, whilst in the other cases the outcomes are almost similar. Results obtained from this study will take part an important role in promoting sustainable generation of hydropower, and thus towards environment friendly energy production.

  6. Thermo economical optimization of sugar plants with environmental constraints

    Energy Technology Data Exchange (ETDEWEB)

    Colombo, Mauricio; Mele, Fernando Daniel; Hernandez, Maria Rosa [Universidad Nacional de Tucuman (UNT), Tucuman (Argentina). Facultad de Ciencias Exactas y Tecnologia], Email: macolombo@herrera.unt.edu.ar; Gatica, Jorge [Cleveland State University (CSU), Cleveland, OH (United States). Dept. of Chemical and Biomedical Engineering], Email: j.gatica@csuohio.edu; Silveira, Jose Luz [Universidade Estadual Paulista (FEG/UNESP), Guaratingueta, SP (Brazil). Faculdade de Engenharia. Dept. de Energia], Email: joseluz@feg.unesp.br

    2009-07-01

    This paper highlights the need for analysis and optimization techniques which can be applied to new energy systems and include considerations for environmental issues. These techniques have proven indispensable in dealing with the constrained optimization problem of finite natural resources and growing demands of energy. Within this framework, thermo economical optimization has gradually been brought to the forefront as a powerful tool in assisting the decision-making process. This work uses the technique of Life Cycle Analysis (LCA) as a means to include environmental indexes in the optimization process. While most of the environmental approaches formulate the optimization problem aiming to reduce residue generation without assessing the impact of this reduction on related processes, LCA considers environmental issues as an integral part of the optimization problem. A sugar cane processing plant located in Tucuman (Argentina) is selected as a case study. This example serves to highlight the importance of formulating solutions that ensure an efficient use of a common fuel to meet useful heat, shaft power, and electricity demands. (author)

  7. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services

    2006-10-12

    This Biennial Environmental Compliance Report (BECR) documents compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste. This BECR covers the reporting period from April 1, 2004, to March 31, 2006. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents United States (U.S.) Department of Energy (DOE) compliance with regulations and permits issued pursuant to the following: (1) Title 40 Code of Federal Regulations (CFR) Part 191, Subpart A, "Environmental Standards for Management and Storage"; (2) Clean Air Act (CAA) (42 United States Code [U.S.C.] §7401, et seq.); (3) Solid Waste Disposal Act (SWDA) (42 U.S.C. §§6901-6992, et seq.); (4) Safe Drinking Water Act (SDWA) (42 U.S.C. §§300f, et seq.); (5) Toxic Substances Control Act (TSCA) (15 U.S.C. §§2601, et seq.); (6) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. §§9601, et seq.); and all other federal and state of New Mexico laws pertaining to public health and safety or the environment.

  8. Economic and environmental balancing in response to NEPA for electric power generating plants

    International Nuclear Information System (INIS)

    Bender, M.

    1976-01-01

    Discussion of principles that can provide guidance in responding to the National Environmental Policy Act (NEPA) in the planning of electric power generating plants. The environmental assessment procedure described is initiated by considering alternative decisions in concern for environmental assessment. Having defined the decision paths, the assessment proceeds in a four-phase sequence: Correlation of the alternatives with resource and marketing restraints; screening the alternatives for environmental adequacy and specifying the needed technological refinement; examination of the economics in terms of energy costs; comparing the energy cost with the environmental index and selecting the combination that best reflects the current social preference. (Auth.)

  9. Environmental radioactivity levels, Sequoyah Nuclear Plant. Annual report, 1983

    International Nuclear Information System (INIS)

    1984-04-01

    This report describes the environmental radiological monitoring of the Sequoyah Nuclear Plant (SQN) located in Hamilton County, Tennessee, conducted in 1983. Dose estimates were calculated from concentrations of radioactivity found in samples of air, milk, water, and fish. It was concluded there were no significant increases in the exposure to members of the general public attributable to the operation of SQN. 11 figures, 34 tables

  10. Predicting plant performance under simultaneously changing environmental conditions – the interplay between temperature, light and internode growth

    Directory of Open Access Journals (Sweden)

    Katrin eKahlen

    2015-12-01

    Full Text Available Plant performance is significantly influenced by prevailing light and temperature conditions during plant growth and development. For plants exposed to natural fluctuations in abiotic environmental conditions it is however laborious and cumbersome to experimentally assign any contribution of individual environmental factors to plant responses. This study aimed at analyzing the interplay between light, temperature and internode growth based on model approaches. We extended the light-sensitive virtual plant model L-Cucumber by implementing a common Arrhenius function for appearance rates, growth rates and growth durations. For two greenhouse experiments, the temperature-sensitive model approach resulted in a precise prediction of cucumber mean internode lengths and number of internodes, as well as in accurately predicted patterns of individual internode lengths along the main stem. In addition, a system’s analysis revealed that environmental data averaged over the experimental period were not necessarily related to internode performance. Finally, the need for a species-specific parameterization of the temperature response function and related aspects in modelling temperature effects on plant development and growth is discussed.

  11. Environmental burdens over the entire life cycle of a biomass CHP plant

    International Nuclear Information System (INIS)

    Jungmeier, G.; Spitzer, J.; Resch, G.

    1998-01-01

    To increase the use of biomass for energy production it is important to know the possible and significant environmental effects. A life cycle inventory (LCI) was made on a 1.3 MW el biomass CHP plant located in Reuthe/Vorarlberg/Austria with the purpose of analysing the different environmental burdens over the entire life cycle. The plant is fired with coarse and small fuelwood (10,000 t/yr) from industrial waste and forest residues. The boiler for the steam process has a moving grate burner and a muffle burner. The annual production is 4700 MWh of electricity and 29,000 MWh of district heat. The methodology of the analysis is orientated on the ISO Committee Draft of the Series 13,600. The analysis was carried out for the different sections of the biomass plant over their entire life cycle-construction (1 yr), operation (20 yrs) and dismantling (1 yr). The plant in Reuthe, which is the first cogeneration system of this kind in Austria, is a model for other similar projects. The results are shown as environmental burdens of one year and of the entire life cycle. Some results of the life cycle inventory, like the mass and energy balances, selected emissions to air, allocation results and effects on carbon storage pools are given. The results demonstrate that depending on the stage and the period of life, different environmental burdens become significant, i.e. CO 2 emissions of fossil fuels during construction. NO x emission during operation, emissions to soil during dismantling. The different options for allocation the environmental burdens to electricity and heat show a wide range of possible results, depending on the choice of allocation parameters (energy, exergy, credits for heat or electricity, price) i.e. for the particles emissions: 161 mg/kWh el to minus 566 mg/kWh el , 0 mg/kWh th to 118 mg/kWh th . With the results of the analysis it is thus possible for future similar projects to know when and where significant environmental burdens might be further

  12. Pinellas Plant environmental monitoring report, 1983

    International Nuclear Information System (INIS)

    1984-04-01

    The results of the effluent and environmental monitoring programs are presented. Small quantities of tritium gas, tritium oxide, carbon-14 labeled solvent and krypton-85 gas were released from the plant during the year. Average maximum ground level concentrations of these radioisotopes were all less than 3/10 of 1 percent of the standard for continuous nonoccupational exposure. The plant's combined sanitary and industrial liquid effluents were analyzed for arsenic, barium, biochemical oxygen demand, boron, cadmium, total chromium, trivalent chromium, hexavalent chromium, copper, cyanide, iron, lead, manganese, mercury, nickel, phenolics, selenium, silver, sulfides, suspended solids and zinc. Small quantities of radioactive tritium were released to the POTW and from the East Pond. Analyses showed the levels were less than 1/10 of one percent of the applicable standards. Site perimeter and off-site air samples for tritium gas and tritium oxide, as well as off-site surface water samples obtained to distance of 9.6 kilometers (6 miles) from the plant site and analyzed for tritium content, showed levels significantly less than 1/10 of 1 percent of the standard for continuous nonoccupational exposure. Calculations were made to determine the radiation doses resulting from releases of tritium oxide, krypton-85 and carbon-14. The calculated doses are exceedingly small when compared to the applicable standards. The total dose commitment to the population residing within 80 kilometers (50 miles) was determined to be 0.40 man-rem as compared to the annual dose from natural radiation of 243,117 man-rem. 10 references, 3 figures, 12 tables

  13. Study of the environmental costs to nuclear power plants using the SIMPACTS program

    Energy Technology Data Exchange (ETDEWEB)

    Menzel, Francine; Sabundjian, Gaiane; Mutarelli, Rita de Cassia, E-mail: fmenzel@ipen.b, E-mail: gdjian@ipen.b [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2011-07-01

    The nuclear energy presents advantages in comparison with other kinds of energy sources, when their externalities are evaluated. Externality is a term that represents the side effects of production of goods or services on other people not directly involved in the activity. The externalities can be identified and related to the term environmental cost. The environmental cost is a externality that somehow affects the environment, converted into economic terms, to then be compared with other costs of an action or enterprise. The environmental cost can be calculated through programs for that purpose, however for the nuclear area is the most used SIMPACTS, developed by the International Atomic Energy Agency (IAEA). The motivation for this work arose from the need to have a complete assessment of environmental costs from nuclear power reactors, although it is known that this kind of form of energy generation show an advantage over others with regard to externalities. This work is the first step in implementing the program SIMPACTS in plant Angra 2 in order to calculate the environmental cost of their operation. The objective is to develop a methodology for calculating environmental cost for nuclear power reactors. SIMPACTS program will be used to identify the advantages and disadvantages of a cost analysis of environmental and perform the calculation of environmental costs for Angra 2, with the aim of minimizing the environmental impacts of its operation. From an extensive literature search, is presented in this paper the methodology for calculating the environmental cost of the program SIMPACTS and some results of calculations with the environmental cost in international power reactors other power generation plants. (author)

  14. Study of the environmental costs to nuclear power plants using the SIMPACTS program

    International Nuclear Information System (INIS)

    Menzel, Francine; Sabundjian, Gaiane; Mutarelli, Rita de Cassia

    2011-01-01

    The nuclear energy presents advantages in comparison with other kinds of energy sources, when their externalities are evaluated. Externality is a term that represents the side effects of production of goods or services on other people not directly involved in the activity. The externalities can be identified and related to the term environmental cost. The environmental cost is a externality that somehow affects the environment, converted into economic terms, to then be compared with other costs of an action or enterprise. The environmental cost can be calculated through programs for that purpose, however for the nuclear area is the most used SIMPACTS, developed by the International Atomic Energy Agency (IAEA). The motivation for this work arose from the need to have a complete assessment of environmental costs from nuclear power reactors, although it is known that this kind of form of energy generation show an advantage over others with regard to externalities. This work is the first step in implementing the program SIMPACTS in plant Angra 2 in order to calculate the environmental cost of their operation. The objective is to develop a methodology for calculating environmental cost for nuclear power reactors. SIMPACTS program will be used to identify the advantages and disadvantages of a cost analysis of environmental and perform the calculation of environmental costs for Angra 2, with the aim of minimizing the environmental impacts of its operation. From an extensive literature search, is presented in this paper the methodology for calculating the environmental cost of the program SIMPACTS and some results of calculations with the environmental cost in international power reactors other power generation plants. (author)

  15. Environmental monitoring report for Pantex Plant covering 1986

    International Nuclear Information System (INIS)

    Laseter, W.A.

    1987-04-01

    This report summarizes the environmental monitoring program at Pantex Plant for 1986. It has been prepared in accordance with the US Department of Energy Order 5484.1. This report presents monitoring data for both radioactive and nonradioactive species in the local environment. Plant activities involve the handling of significant quantities of uranium, plutonium and tritium in the form of completed parts received from other DOE facilities, resulting in a very low potential for release of these radionuclides to the atmosphere. In 1986 only small releases of depleted uranium (depleted in the isotope U-235) and tritium occurred which could have affected the local environment. Monitoring data indicate that concentrations of these nuclides in the environment are below established criteria for air and water and therefore should not present a health hazard either to employees or to the public

  16. Environmental monitoring in the vicinity of the Savannah River Plant. Annual report, 1974

    International Nuclear Information System (INIS)

    1974-01-01

    The results obtained from the environmental monitoring program at the Savannah River Plant during 1974 are presented. An inventory of radioactive materials released to the environment, and data on radioactivity in samples of surface air, surface waters, soil, plants, and food are included. Data are also included on pesticides in Savannah River sediment. (U.S.)

  17. The Queensland study of Melanoma: Environmental and Genetic Associations (Q-MEGA). Study design, baseline characteristics, and repeatability of phenotype and sun exposure measures

    Science.gov (United States)

    Baxter, Amanda J.; Hughes, Maria Celia; Kvaskoff, Marina; Siskind, Victor; Shekar, Sri; Aitken, Joanne F.; Green, Adele C.; Duffy, David L.; Hayward, Nicholas K.; Martin, Nicholas G.; Whiteman, David C.

    2013-01-01

    Cutaneous malignant melanoma (CMM) is a major health issue in Queensland, Australia which has the world’s highest incidence. Recent molecular and epidemiologic studies suggest that CMM arises through multiple etiological pathways involving gene-environment interactions. Understanding the potential mechanisms leading to CMM requires larger studies than those previously conducted. This article describes the design and baseline characteristics of Q-MEGA, the Queensland study of Melanoma: Environmental and Genetic Associations, which followed-up four population-based samples of CMM patients in Queensland, including children, adolescents, men aged over 50, and a large sample of adult cases and their families, including twins. Q-MEGA aims to investigate the roles of genetic and environmental factors, and their interaction, in the etiology of melanoma. 3,471 participants took part in the follow-up study and were administered a computer-assisted telephone interview in 2002–2005. Updated data on environmental and phenotypic risk factors, and 2,777 blood samples were collected from interviewed participants as well as a subset of relatives. This study provides a large and well-described population-based sample of CMM cases with follow-up data. Characteristics of the cases and repeatability of sun exposure and phenotype measures between the baseline and the follow-up surveys, from six to 17 years later, are also described. PMID:18361720

  18. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse TRU Solutions

    2000-12-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final decision by the New Mexico Environment Department (NMED), all alleged violations have been resolved without the assessment of fines or penalties. Non-mixed TRU waste shipments began on March 26, 1999. Shipments continued through November 26, 1999, the effective date of the Waste Isolation Pilot Plant Hazardous Waste Facility Permit (NM4890139088-TSDF). No shipments regulated under the Hazardous Waste Facility Permit were received at WIPP during this BECR reporting period.

  19. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    International Nuclear Information System (INIS)

    Westinghouse TRU Solutions

    2000-01-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final decision by the New Mexico Environment Department (NMED), all alleged violations have been resolved without the assessment of fines or penalties. Non-mixed TRU waste shipments began on March 26, 1999. Shipments continued through November 26, 1999, the effective date of the Waste Isolation Pilot Plant Hazardous Waste Facility Permit (NM4890139088-TSDF). No shipments regulated under the Hazardous Waste Facility Permit were received at WIPP during this BECR reporting period

  20. Meta-analysis Number of Plants Drugs Used by Characteristics Socioeconomic Factors, Environmental and Geographic

    Directory of Open Access Journals (Sweden)

    Febiola Diah Pratiwi

    2017-09-01

    Full Text Available Ethnobotany is the study of public relations with the use of plants. Use of plants by people influenced by several factors, such as social, cultural, socioeconomic, and geographic. Most of the ethnicities in Indonesia has a high dependence on plants medicine for survival. However, the factors that influence the use of medicinal plants by people in Indonesia have not been studied, so that research is needed to optimize the use of medicinal plants to sustainability benefits. The purpose of this study is to analyze the number of species of plants medicine used by the influence of socio-economic, environmental, and geographic factors using principal component analysis and analyzing patterns of use of plants medicine. The results showed that the economy and infrastructure components (access to electricity, means of education, income level, health facilities, distance from the highway, remoteness, and the fastest time toward the road and the number of people graduating from elementary school affect the number of medicinal plant species used. Based on the results of the study of literature and field observations, the pattern of use of plants medicine in addition to be used as medicine, the plant is used for food, building materials, plant ornamental, ceremonial, wood, wicker and crafts, coloring agents, animal feed, ingredients aromatic, and pesticide. The usage patterns in each region or village has the distinction of which is influenced by the remoteness factor due to the differences in the social, economic, environmental, and geographic.  Keywords: ethnobotany, plants medicine, principal component analysis

  1. A proposal to create an extension to the European baseline series.

    Science.gov (United States)

    Wilkinson, Mark; Gallo, Rosella; Goossens, An; Johansen, Jeanne D; Rustemeyer, Thomas; Sánchez-Pérez, Javier; Schuttelaar, Marie L; Uter, Wolfgang

    2018-02-01

    The current European baseline series consists of 30 allergens, and was last updated in 2015. To use data from the European Surveillance System on Contact Allergies (ESSCA) to propose an extension to the European baseline series in response to changes in environmental exposures. Data from departmental and national extensions to the baseline series, together with some temporary additions from departments contributing to the ESSCA, were collated during 2013-2014. In total, 31689 patients were patch tested in 46 European departments. Many departments and national groups already consider the current European baseline series to be a suboptimal screen, and use their own extensions to it. The haptens tested are heterogeneous, although there are some consistent themes. Potential haptens to include in an extension to the European baseline series comprise sodium metabisulfite, formaldehyde-releasing preservatives, additional markers of fragrance allergy, propolis, Compositae mix, and 2-hydroxyethyl methacrylate. In combination with other published work from the ESSCA, changes to the current European baseline series are proposed for discussion. As well as addition of the allergens listed above, it is suggested that primin and clioquinol should be deleted from the series, owing to reduced environmental exposure. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  2. L-Reactor operation, Savannah River Plant: environmental assessment

    International Nuclear Information System (INIS)

    1982-08-01

    The purpose of this document is to assess the significance of the effects on the human environment of the proposed resumption of L-reactor operation at the Savannah River Plant, scheduled for October 1983. The discussion is presented under the following section headings: need for resumption of L-Reactor operations and purpose of this environmental assessment; proposed action and alternative; affected environment (including, site location and description, land use, historic and archeological resources, socioeconomic and community characteristics, geology and seismology, hydrology, meteorology and climatology, ecology, and radiation environment); environmental consequences; summary of projected L-Reactor releases and impacts; and Federal and State permits and approval. The three appendices are entitled: radiation dose calculation methods and assumptions; floodplain/wetlands assessment - L-Reactor operations; and, conversion table. A list of references is included at the end of each chapter

  3. Final environmental impact statement. Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described

  4. EXOTIC PLANTS IN THE CIBODAS BOTANIC GARDENS REMNANT FOREST: INVENTORY AND CLUSTER ANALYSIS OF SEVERAL ENVIRONMENTAL FACTORS

    Directory of Open Access Journals (Sweden)

    Decky Indrawan Junaedi

    2014-01-01

    Full Text Available Due to potential impact of invasive alien (exotic species to the natural ecosystems, inventory of exotic species in the Cibodas Botanic Gardens (CBG remnant forest area is an urgent need for CBG. Inventory of exotic species can assist gardens manager to set priorities and plan better responses for possible or existed invasive plants in the CBG remnants forest. The objectives of this study are to do inventory of the exotic species in the CBG remnant forest and to determine whether several environmental variables play role to the existence of exotic species in the CBG remnant forests. There are 26 exotic plant species (23 genera, 14 families found and recorded from all four remnant forests in CBG. Cluster analysis of four environmental variables shows that clustering of environmental factors of exotic species correlates with the abundances of those exotic species. The relation between environmental factor clusters and the abundance of those exotics signify the role of environmental variables on the existence of exotic plant species. The information of exotic plant species in the remnants forest is the base information for gardens manager to manage exotic species in CBG remnants forest. The relation of several environmental factors with exotic species abundance could assist gardens manager to understand better the supportive and or suppressor factors of exotics in the CBG remnants forest. Further study on these species is needed to set priorities to decide which species should be treated first in order to minimize the impact of exotic plant species to native ecosystem of CBG.

  5. EXOTIC PLANTS IN THE CIBODAS BOTANIC GARDENS REMNANT FOREST: INVENTORY AND CLUSTER ANALYSIS OF SEVERAL ENVIRONMENTAL FACTORS

    Directory of Open Access Journals (Sweden)

    Decky Indrawan Junaedi

    2014-01-01

    Full Text Available Due to potential impact of invasive alien (exotic species to the natural ecosystems, inventory of exotic species in the Cibodas Botanic Gardens (CBG remnant forest area is an urgent need for CBG. Inventory of exotic species can assist gardens manager to set priorities and plan better responses for possible or existed invasive plants in the CBG remnants forest. The objectives of this study are to do inventory of the exotic species in the CBG remnant forest and to determine whether several environmental variables play role to the existence of exotic species in the CBG remnant forests. There are 26 exotic plant species  (23 genera, 14 families found and recorded from all four remnant forests in CBG. Cluster analysis of four environmental variables shows that clustering of environmental factors of exotic species correlates with the abundances of those exotic species. The relation between environmental factor clusters and the abundance of those exotics signify the role of environmental variables on the existence of exotic plant species. The information of exotic plant species in the remnants forest is the base information for gardens manager to manage exotic species in CBG remnants forest. The relation of several environmental factors with exotic species abundance could assist gardens manager to understand better the supportive and or suppressor factors of exotics in the CBG remnants forest. Further study on these species is needed to set priorities to decide which species should be treated first in order to minimize the impact of exotic plant species to native ecosystem of CBG.

  6. The site of a nuclear power plant and environmental safety; Ydinvoimalaitoksen sijaintipaikka ja ympaeristoen turvallisuus

    Energy Technology Data Exchange (ETDEWEB)

    Rossi, J. [VTT Energy, Espoo (Finland)

    2001-11-01

    The purpose of this report is to give the reader a general view of the things associated with the site of a nuclear power plant. In this context the effect of a nuclear power plant and site on environmental safety is considered. Planning, construction and operating a nuclear power plant require several judgements and licenses based on different laws. The location of the planned nuclear facility project and environmental conditions contribute in great detail to the compliance arguments of permits. At first the environmental impacts of the siting project and its alternatives shall be investigated in the Environmental Impact Assessment procedure. Then the decision in principle according to the Nuclear Energy Act can be applied from the Council of State, the decision shall further be confirmed by Parliament. When the decision in principle is considered the overall good of society shall be assessed by means of considering i.a. site alternatives and safety. The safety related basic principle is that operation of a nuclear power plant may not cause danger to the environment, public or property. After the affirmative principle approval the construction license and later on the operation license can be applied from the Council of State, these licenses need to be supported i.a. by building and environmental licenses of separate authorities. Also some international contracts concern realisation of a nuclear power plant siting. The nuclear power plant site shall be suitable for the needs of the electricity production and the transmission system and it shall be technically appropriate for building and operation of a power plant. The site shall be safe enough on the other hand from the view of external events threatening the power plant - although one can be partly prepared for these things in the design of the plant - and on the other hand from the point of public safety. Requirements for the safety of the site are directed in the decision of the Council of State's general

  7. Estimating the cold war mortgage: The 1995 baseline environmental management report. Volume II: Site summaries

    International Nuclear Information System (INIS)

    1995-03-01

    This volume, Volume II presents the site data that was used to generate the Department of Energy's (DOE) initial Baseline Environmental Management Report (BEMR). The raw data was obtained by DOE field personnel from existing information sources and anticipated environmental management strategies for their sites and was tempered by general assumptions and guidance developed by DOE Headquarters personnel. This data was then integrated by DOE Headquarters personnel and modified to ensure that overall constraints such as funding and waste management capacity were addressed. The site summaries are presented by State and broken out by discrete activities and projects. The Volume I Glossary has been repeated to facilitate the reader's review of Volume II. The information presented in the site summaries represents the best data and assumptions available as of February 1, 1995. Assumptions that have not been mandated by formal agreement with appropriate regulators and other stakeholders do not constitute decisions by the Department nor do they supersede existing agreements. In addition, actions requiring decisions from external sources regarding unknowns such as future land use and funding/scheduling alternatives, as well as internal actions such as the Department's Strategic Realignment initiative, will alter the basis and general assumptions used to generate the results for this report. Consequently, the numbers presented in the site summaries do not represent outyear budget requests by the field installations

  8. 40 CFR 80.290 - How does a refiner apply for a sulfur baseline?

    Science.gov (United States)

    2010-07-01

    ... baseline? 80.290 Section 80.290 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... (abt) Program-General Information § 80.290 How does a refiner apply for a sulfur baseline? (a) The... accordance with § 80.217. (b) The sulfur baseline request must be sent to: U.S. EPA, Attn: Sulfur Program...

  9. A preliminary evaluation of environmental indexes of great hydropower plants localized in various Brazilian states and geographical aspects

    International Nuclear Information System (INIS)

    Caetano de Souza, Antonio Carlos

    2009-01-01

    The predominantly tropical climate and the predominance of plateaus in Brazil contributed to the development of a high hydroelectric potential, which determined the choice of hydropower plants as main technology of electricity generation. Though this is a renewable source, dams must being established to guarantee high amount of water all over the year generating high environmental and social impact. One of the ways to evaluate environmental impacts caused by large hydropower plants is adoption of environmental indexes which are formed by ratio of installed or firm power with dam area of a hydropower plant. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. Statistical instruments were utilized to evaluate environmental indexes in the five Brazilian regions, twenty six states, and fifteen main rivers (where at least three large hydropower plants are encountered). The periods when each hydropower plant operation was initiated were also considered. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. More, the greatest encountered media indexes were also found in dams established in the 1950s. (author)

  10. Responses to comments on the remedial investigation/feasibility study-environmental impact statement for remedial action at the Chemical Plant area of the Weldon Spring site (November 1992)

    International Nuclear Information System (INIS)

    1993-06-01

    The US Department of Energy (DOE) is responsible for cleanup activities at the Weldon Spring site in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry; both areas are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced by the US Army at the chemical plant in the 1940s, and uranium and thorium materials were processed by DOE's predecessor agency in the 1950s and 1960s. During that time, various wastes were disposed of at both areas of the site. The DOE is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The integrated remedial investigation/feasibility study-environmental impact statement (RI/FS-EIS) documents for the chemical plant area were issued to the public in November 1992 as the draft RI/FS-EIS. (The CERCLA RI/FS is considered final when issued to the public, whereas per the NEPA process, an EIS is initially issued as a draft and is finalized after substantive public comments have been addressed.) Four documents made up the draft RI/FS-EIS, which is hereafter referred to as the RI/FS-EIS: (1) the RI (DOE 1992d), which presents general information on the site environment and the nature and extent of contamination; (2) the baseline assessment (BA) (DOE 1992a), which evaluates human health and environmental effects that might occur if no cleanup actions were taken; (3) the FS (DOE 1992b), which develops and evaluates alternatives for site cleanup; and (4) the proposed plan (PP) (DOE 1992c), which summarizes key information from the RI, BA, and FS reports and identifies DOE's preferred alternative for remedial action. This comment response document combined with those four documents constitutes the final RI/FS-EIS for the chemical plant area

  11. Responses to comments on the remedial investigation/feasibility study-environmental impact statement for remedial action at the Chemical Plant area of the Weldon Spring site (November 1992)

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    The US Department of Energy (DOE) is responsible for cleanup activities at the Weldon Spring site in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry; both areas are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced by the US Army at the chemical plant in the 1940s, and uranium and thorium materials were processed by DOE`s predecessor agency in the 1950s and 1960s. During that time, various wastes were disposed of at both areas of the site. The DOE is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The integrated remedial investigation/feasibility study-environmental impact statement (RI/FS-EIS) documents for the chemical plant area were issued to the public in November 1992 as the draft RI/FS-EIS. (The CERCLA RI/FS is considered final when issued to the public, whereas per the NEPA process, an EIS is initially issued as a draft and is finalized after substantive public comments have been addressed.) Four documents made up the draft RI/FS-EIS, which is hereafter referred to as the RI/FS-EIS: (1) the RI (DOE 1992d), which presents general information on the site environment and the nature and extent of contamination; (2) the baseline assessment (BA) (DOE 1992a), which evaluates human health and environmental effects that might occur if no cleanup actions were taken; (3) the FS (DOE 1992b), which develops and evaluates alternatives for site cleanup; and (4) the proposed plan (PP) (DOE 1992c), which summarizes key information from the RI, BA, and FS reports and identifies DOE`s preferred alternative for remedial action. This comment response document combined with those four documents constitutes the final RI/FS-EIS for the chemical plant area.

  12. Waset Isolation Pilot Plant Annual Site Environmental Report for 2006

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2007-09-26

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2006 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that: (a) Characterize site environmental management performance; (b) Summarize environmental occurrences and responses reported during the calendar year; (c) Confirm compliance with environmental standards and requirements; and (d) Highlight significant facility programs and efforts. The DOE Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) maintain and preserve the environmental resources at the WIPP site. DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This report was prepared in accordance with DOE Order 231.1A. This order requires that DOE facilities submit an ASER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) (No. NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  13. Waset Isolation Pilot Plant Annual Site Environmental Report for 2006

    International Nuclear Information System (INIS)

    2007-01-01

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2006 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that: (a) Characterize site environmental management performance; (b) Summarize environmental occurrences and responses reported during the calendar year; (c) Confirm compliance with environmental standards and requirements; and (d) Highlight significant facility programs and efforts. The DOE Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) maintain and preserve the environmental resources at the WIPP site. DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This report was prepared in accordance with DOE Order 231.1A. This order requires that DOE facilities submit an ASER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) (No. NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  14. A review of environmental governance and its effects on concentrate discharge from desalination plants in the Kingdom of Saudi Arabia

    KAUST Repository

    Van Der Merwe, Riaan

    2013-01-01

    The most likely environmental impact of concentrate discharges (in most instances twice the concentration of the ambient environment) leaking from desalination plants on local marine ecosystems has been controversially discussed for many years. Increasing water demand and lack of renewable natural water resources in Saudi Arabia also result in greater dependence on desalination and consequently amplify the impact on marine environment and multifactorial ecosystems in near-field areas of desalination discharges. Accurate scientific baseline data should furnish information on various factors such as intake- and outfall locality, brine (concentrate) discharge and chemical characteristics (i.e. effluent concentration, mass flow rates (flux)), local effects, and even cumulative effects of desalination activities, at least on a regional and even on a national scale. Even if such data were available, in many cases they are non-transparent and are not even accessible, or tend to be overlooked as a result of ambiguous desalination-related policies. This paper focuses on national environmental regulations in the Kingdom of Saudi Arabia (KSA) and how such regulations help control the flow of concentrate discharge into the receiving waters. © 2013 Desalination Publications.

  15. Environmental modeling in the neighborhood of nuclear power plant Kalpakkam, Chennai

    International Nuclear Information System (INIS)

    Chockalingam, M.P.; Chandramohan, R.

    2014-01-01

    As a preparatory arrangement, it is essential to conduct an environmental monitoring around the Kalpakkam Atomic Power Plant to enhance 'preparedness' for the requirements of disaster management. It is assumed as a hypothetical probability, as all of us are aware that the power plant at Kalpakkam has been designed for 100 % safety. In this relevance, an air inquiry modeling applicable to North Chennai Thermal Power Plant is considered applicable, as a model, to be simulated at Kalpakkam site. The Japan accident at Fukushima Daiichi site has been shown as an example, for the purpose of assessing the impact on the environment, in order to understand the three-dimensional distribution of radioactive pollutants. (author)

  16. Environmental assessment of the atlas bio-energy waste wood fluidized bed gasification power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Holzman, M.I.

    1995-08-01

    The Atlas Bio-Energy Corporation is proposing to develop and operate a 3 MW power plant in Brooklyn, New York that will produce electricity by gasification of waste wood and combustion of the produced low-Btu gas in a conventional package steam boiler coupled to a steam-electric generator. The objectives of this project were to assist Atlas in addressing the environmental permit requirements for the proposed power plant and to evaluate the environmental and economic impacts of the project compared to more conventional small power plants. The project`s goal was to help promote the commercialization of biomass gasification as an environmentally acceptable and economically attractive alternative to conventional wood combustion. The specific components of this research included: (1) Development of a permitting strategy plan; (2) Characterization of New York City waste wood; (3) Characterization of fluidized bed gasifier/boiler emissions; (4) Performance of an environmental impact analysis; (5) Preparation of an economic evaluation; and (6) Discussion of operational and maintenance concerns. The project is being performed in two phases. Phase I, which is the subject of this report, involves the environmental permitting and environmental/economic assessment of the project. Pending NYSERDA participation, Phase II will include development and implementation of a demonstration program to evaluate the environmental and economic impacts of the full-scale gasification project.

  17. Environmental release targets for fusion power plants

    International Nuclear Information System (INIS)

    Gulden, W.; Raskob, W.

    2005-01-01

    Within the European fission community, so called European Utility Requirements were developed to define common targets, criteria and evaluation methods for, amongst others, safety, environmental protection and public health with respect to future nuclear fission power plant development. In the case of severe accidents, the objective is to restrict the radiological consequences to the vicinity of the plant, i.e., to avoid early and late countermeasures such as evacuation or relocation of the population, and to restrict food banning to small areas and the first year after the accident. Within the European Fusion Technology Programme, a methodology is being developed in compliance with these European Utility Requirements, to define design requirements for future fusion reactors. First results are presented. Concerning food banning, calculations revealed extremely conservative values for tritium in EU regulations and recommendations. This does not affect assessments for fission reactors, but is an overestimation of the tritium dose impact from ingestion. Therefore, in compliance with scientific justification, considerably higher maximum permissible activity levels for tritium should be considered

  18. Economic and environmental balancing in response to NEPA for electric power generating plants

    Energy Technology Data Exchange (ETDEWEB)

    Bender, M [Oak Ridge National Lab., Tenn. (USA)

    1976-03-01

    A discussion is given of principles that can provide guidance in responding to the National Environmental Policy Act (NEPA) in the planning of electric power generating plants. The environmental assessment procedure described is initiated by considering alternative decisions in concern for environmental assessment. Having defined the decision paths, the assessment proceeds in a four-phase sequence: correlation of the alternatives with resource and marketing restraints; screening the alternatives for environmental adequacy and specifying the needed technological refinement; examination of the economics in terms of energy costs; comparing the energy cost with the environmental index and selecting the combination that best reflects the current social preference.

  19. Assessing environmental impacts of genetically modified plants on non-target organisms

    NARCIS (Netherlands)

    Arpaia, Salvatore; Birch, A.N.E.; Kiss, Jozsef; Loon, van Joop J.A.; Messéan, Antoine; Nuti, Marco; Perry, Joe N.; Sweet, Jeremy B.; Tebbe, Christoph C.

    2017-01-01

    In legal frameworks worldwide, genetically modified plants (GMPs) are subjected to pre-market environmental risk assessment (ERA) with the aim of identifying potential effects on the environment. In the European Union, the EFSA Guidance Document introduces the rationale that GMPs, as well as their

  20. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Science.gov (United States)

    2010-02-25

    ... Dusenbury of the North Carolina Department of Environment and Natural Resources regarding the environmental... & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No... identification of licensing and regulatory actions requiring environmental assessments,'' the NRC prepared an...

  1. Health-safety and environmental risk assessment of power plants using multi criteria decision making method

    Directory of Open Access Journals (Sweden)

    Jozi Ali Seyed

    2011-01-01

    Full Text Available Growing importance of environmental issues at global and regional levels including pollution of water, air etc. as well as the outcomes such as global warming and climate change has led to being considered environmental aspects as effective factors for power generation. Study ahead, aims at examination of risks resulting from activities of Yazd Combined Cycle Power Plant located in Iran. Method applied in the research is analytical hierarchy process. After identification of factors causing risk, the analytical hierarchy structure of the power plant risks were designed and weight of the criteria and sub-criteria were calculated by intensity probability product using Eigenvector Method and EXPERT CHOICE Software as well. Results indicate that in technological, health-safety, biophysical and socio economic sections of the power plant, factors influenced by the power plant activities like fire and explosion, hearing loss, quantity of groundwater, power generation are among the most important factors causing risk in the power plant. The drop in underground water levels is the most important natural consequence influenced on Yazd Combined Cycle Power Plant.

  2. Environmental performance management

    International Nuclear Information System (INIS)

    Kwant, J.W.H.; Grant, R.O.H.

    1991-01-01

    This paper describes the environmental programme developed by Shell U.K. Exploration and Production (EXPRO) aiming at a continuous improvement of its environmental performance. The company operates a total of 33 platforms in the North Sea and has 3 land based gas treatment plants. This paper, therefore, relates mainly to the offshore environment. The programme is driven by adopting a goal setting policy. The plan was initiated mid 1990 when an inventory was made of all gaseous emissions, liquid effluents and solid waste discharges of EXPRO's operations during 1989. This baseline was used to identify the largest waste steams and to set priorities for the subsequent improvement programme. Areas for improvement are: atmospheric emissions from venting, flaring and the use of Freons and Halons, the use of Oil Based Mud (OBM), produced water and the disposal of industrial waste. The programme has gained momentum and targets have been set

  3. Evaluating impact level of different factors in environmental impact assessment for incinerator plants using GM (1, N) model.

    Science.gov (United States)

    Pai, T Y; Chiou, R J; Wen, H H

    2008-01-01

    In this study, the impact levels in environmental impact assessment (EIA) reports of 10 incinerator plants were quantified and discussed. The relationship between the quantified impact levels and the plant scale factors of BeiTou, LiZe, BaLi, LuTsao, RenWu, PingTung, SiJhou and HsinChu were constructed, and the impact levels of the GangShan (GS) and YongKong (YK) plants were predicted using grey model GM (1, N). Finally, the effects of plant scale factors on impact levels were evaluated using grey model GM (1, N) too. According to the predicted results of GM, the relative errors of topography/geology/soil, air quality, hydrology/water quality, solid waste, noise, terrestrial fauna/flora, aquatic fauna/flora and traffic in the GS plant were 17%, 14%, 15%, 17%, 75%, 16%, 13%, and 37%, respectively. The relative errors of the same environmental items in the YK plant were 1%, 18%, 10%, 40%, 37%, 3%, 25% and 33%, respectively. According to GM (1, N), design capacity (DC) and heat value (HV) were the plant scale factors that affected the impact levels significantly in each environmental item, and thus were the most significant plant scale factors. GM (1, N) was effective in predicting the environmental impact and analyzing the reasonableness of the impact. If there is an EIA for a new incinerator plant to be reviewed in the future, the official committee of the Taiwan EPA could review the reasonableness of impact levels in EIA reports quickly.

  4. Environmental and technological implications of a theta-pinch fusion power plant

    International Nuclear Information System (INIS)

    Coultas, T.A.; Burke, R.J.; Krakowski, R.A.

    1974-01-01

    The environmental effects of this conceptual design were evaluated and found to be little different from other electrical power plants in most regards. Exceptions include a very small release of tritium, a low-hazard isotope, and relatively large amounts of radioactive material which must be either stored on site for eventual reprocessing or permanently discarded. These radioactive materials are nonvolatile and should not pose a difficult disposal problem, although some of the material may remain radioactive for hundreds of years. Natural resources required to build and operate the reference plant are not excessive except perhaps in the case of niobium and beryllium. The accident, sabotage, etc., problems of the plant are very minimal and although accidents can be postulated which would be inconvenient and costly within the plant, the probability of sizable impact on the surroundings is so as to be incredible

  5. Final environmental impact statement. Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  6. Environmental impact of nuclear power plants. Proceedings of a conference held November 26-30, 1974, in Atlanta, Georgia

    International Nuclear Information System (INIS)

    Karam, R.A.; Morgan, K.Z.

    1976-01-01

    This conference served as a forum for experts, power industry executives and engineers, and Federal and state agencies' representatives to discuss and exchange information on the environmental effects of nuclear power plants. An objective of this meeting was to identify the necessary elements and legal requirements for environmental impact statements. Twenty-three papers were presented in six sessions: Plant Site Selection; Ecology; Radioactive Waste and Thermal Pollution; Standards and Guidelines in the Preparation of Environmental Impact Statements; Cost-Benefit Analysis; and Environmental Impact Studies of Various Power Reactors

  7. Environmental impact efficiency of natural gas combined cycle power plants: A combined life cycle assessment and dynamic data envelopment analysis approach.

    Science.gov (United States)

    Martín-Gamboa, Mario; Iribarren, Diego; Dufour, Javier

    2018-02-15

    The energy sector is still dominated by the use of fossil resources. In particular, natural gas represents the third most consumed resource, being a significant source of electricity in many countries. Since electricity production in natural gas combined cycle (NGCC) plants provides some benefits with respect to other non-renewable technologies, it is often seen as a transitional solution towards a future low‑carbon power generation system. However, given the environmental profile and operational variability of NGCC power plants, their eco-efficiency assessment is required. In this respect, this article uses a novel combined Life Cycle Assessment (LCA) and dynamic Data Envelopment Analysis (DEA) approach in order to estimate -over the period 2010-2015- the environmental impact efficiencies of 20 NGCC power plants located in Spain. A three-step LCA+DEA method is applied, which involves data acquisition, calculation of environmental impacts through LCA, and the novel estimation of environmental impact efficiency (overall- and term-efficiency scores) through dynamic DEA. Although only 1 out of 20 NGCC power plants is found to be environmentally efficient, all plants show a relatively good environmental performance with overall eco-efficiency scores above 60%. Regarding individual periods, 2011 was -on average- the year with the highest environmental impact efficiency (95%), accounting for 5 efficient NGCC plants. In this respect, a link between high number of operating hours and high environmental impact efficiency is observed. Finally, preliminary environmental benchmarks are presented as an additional outcome in order to further support decision-makers in the path towards eco-efficiency in NGCC power plants. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. Indoor air quality in the Karns research houses: baseline measurements and impact of indoor environmental parameters on formaldehyde concentrations

    International Nuclear Information System (INIS)

    Matthews, T.G.; Fung, K.W.; Tromberg, B.J.; Hawthorne, A.R.

    1985-12-01

    Baseline indoor air quality measurements, a nine-month radon study, and an environmental parameters study examining the impact of indoor temperature (T) and relative humidity (RH) levels on formaldehyde (CH 2 O) concentrations have been performed in three unoccupied research homes located in Karns, Tennessee. Inter-house comparison measurements of (1) CH 2 O concentration, (2) CH 2 O emission rates from primary CH 2 O emission sources, (3) radon and radon daughter concentrations, and (4) air exchange rates indicate that the three homes are similar. The results of the nine-month radon study indicate indoor concentrations consistently below the EPA recommended level of 4 pCi/L. Evidence was found that crawl-space concentrations may be reduced using heat pump systems whose outdoor units circulate fresh air through the crawl-space. The modeled results of the environmental parameters study indicate approximate fourfold increases in CH 2 O concentrations from 0.07 to 0.27 ppM for seasonal T and RH conditions of 20 0 C, 30% RH and 29 0 C, 80% RH, respectively. Evaluation of these environmental parameters study data with steady-state CH 2 O concentration models developed from laboratory studies of the environmental dependence of CH 2 O emissions from particleboard underlayment indicate good correlations between the laboratory and field studies

  9. The basic planning for the environmental relationship of improved nuclear power plant

    International Nuclear Information System (INIS)

    Choi, Seungho; Jung, Hoonseok; Lee, Dongheup

    2003-01-01

    The Improved Nuclear Power Plant (INPP) which design has been emphasized on the safety, technology and environmental relationship is about to be realized after hard works of design improvements, largely changes made from existing PWR nuclear power plants for three years. It will undoubtedly play a leading role of nuclear power generation industry as a main electric power source and secure a place as a successful issue between development and environment throughout nation-wide understanding and support. (author)

  10. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  11. Aspects of cleaning environmental materials for multi-element analysis, e.g. plant samples

    International Nuclear Information System (INIS)

    Markert, B.

    1992-01-01

    Cleaning of samples is often the first step in the entire procedure of sample preparation in environmental trace element research. The question must generally be raised of whether cleaning is meaningful before chemical investigations with plant material (e.g. for the determination of transfer factors in the soil/plant system) or not (e.g. for food chain analysis in the plant/animal system). The most varied cleaning procedures for plant samples are currently available ranging from dry and wet wiping of the leaf or needle surface up to the complete removal of the cuticule with the aid of chlorofom. There is at present no standardized cleaning procedure for plant samples so that it is frequently not possible to compare analytical data from different working groups studying the same plant species. (orig.)

  12. Input-output model of regional environmental and economic impacts of nuclear power plants

    International Nuclear Information System (INIS)

    Johnson, M.H.; Bennett, J.T.

    1979-01-01

    The costs of delayed licensing of nuclear power plants calls for a more-comprehensive method of quantifying the economic and environmental impacts on a region. A traditional input-output (I-O) analysis approach is extended to assess the effects of changes in output, income, employment, pollution, water consumption, and the costs and revenues of local government disaggregated among 23 industry sectors during the construction and operating phases. Unlike earlier studies, this model uses nonlinear environmental interactions and specifies environmental feedbacks to the economic sector. 20 references

  13. Environmental control of plant nuclear gene expression by chloroplast redox signals

    Directory of Open Access Journals (Sweden)

    Jeannette ePfalz

    2012-11-01

    Full Text Available Plant photosynthesis takes place in specialised cell organelles, the chloroplasts, which perform all essential steps of this process. The proteins involved in photosynthesis are encoded by genes located on the plastid and nuclear genomes. Proper function and regulation of light harvesting and energy fixation thus requires a tight coordination of the gene expression machineries in the two genetic compartments. This is achieved by a bi-directional exchange of information between nucleus and plastids. Signals emerging from plastids report the functional and developmental state of the organelle to the nucleus and initiate distinct nuclear gene expression profiles, which trigger responses that support or improve plastid functions. Recent research indicated that this signalling is absolutely essential for plant growth and development. Reduction/oxidation (redox signals from photosynthesis are key players in this information network since they do report functional disturbances in photosynthesis, the primary energy source of plants. Such disturbances are caused by environmental fluctuations for instance in illumination, temperature or water availability. These environmental changes affect the linear electron flow of photosynthesis and result in changes of the redox state of the components involved (e.g. the plastoquinone pool or coupled to it (e.g. the thioredoxin pool. Thus, the changes in redox state directly reflect the environmental impact and serve as immediate plastidial signals to the nucleus. The triggered responses range from counterbalancing reactions within the physiological range up to severe stress responses including cell death. This review focuses on physiological redox signals from photosynthetic electron transport, their relation to the environment, potential transduction pathways to the nucleus and their impact on nuclear gene expression.

  14. A method for diagnosis of plant environmental stresses by gene expression profiling using a cDNA macroarray

    International Nuclear Information System (INIS)

    Tamaoki, Masanori; Matsuyama, Takashi; Nakajima, Nobuyoshi; Aono, Mitsuko; Kubo, Akihiro; Saji, Hikaru

    2004-01-01

    Plants in the field are subjected to numerous environmental stresses. Lengthy continuation of such environmental stresses or a rapid increase in their intensity is harmful to vegetation. Assessments of the phytotoxicity of various stresses have been performed in many countries, although they have largely been based on estimates of leaf injury. We developed a novel method of detecting plant stresses that is more sensitive and specific than those previously available. This method is based on the detection of mRNA expression changes in 205 ozone-responsive Arabidopsis expressed sequence tags (ESTs) by cDNA macroarray analysis. By using this method, we illustrated shifts in gene expression in response to stressors such as drought, salinity, UV-B, low temperature, high temperature, and acid rain, as distinct from those in response to ozone. We also made a mini-scale macroarray with 12 ESTs for diagnosis of the above environmental stresses in plants. These results illustrate the potential of our cDNA macroarray for diagnosis of various stresses in plants

  15. Analysis of environmental impact phase in the life cycle of a nuclear power plant

    International Nuclear Information System (INIS)

    Hernandez del M, C.

    2015-01-01

    The life-cycle analysis covers the environmental aspects of a product throughout its life cycle. The focus of this study was to apply a methodology of life-cycle analysis for the environmental impact assessment of a nuclear power plant by analyzing international standards ISO 14040 and 14044. The methodology of life-cycle analysis established by the ISO 14044 standard was analyzed, as well as the different impact assessment methodologies of life cycle in order to choose the most appropriate for a nuclear power plant; various tools for the life-cycle analysis were also evaluated, as is the use of software and the use of databases to feed the life cycle inventory. The functional unit chosen was 1 KWh of electricity, the scope of analysis ranging from the construction and maintenance, disposal of spent fuel to the decommissioning of the plant, the manufacturing steps of the fuel were excluded because in Mexico is not done this stage. For environmental impact assessment was chosen the Recipe methodology which evaluates up to 18 impact categories depending on the project. In the case of a nuclear power plant were considered only categories of depletion of the ozone layer, climate change, ionizing radiation and formation of particulate matter. The different tools for life-cycle analysis as the methodologies of impact assessment of life cycle, different databases or use of software have been taken according to the modeling of environmental sensitivities of different regions, because in Mexico the methodology for life-cycle analysis has not been studied and still do not have all the tools necessary for the evaluation, so the uncertainty of the data supplied and results could be higher. (Author)

  16. The environmental performance of three alcohol fuel plants producers of small, medium and big scale

    International Nuclear Information System (INIS)

    Borrero, Manuel Antonio Valdes; Pereira, Jose Tomaz Vieira; Miranda, Evaristo Eduardo de

    1999-01-01

    The article discusses the following issues of alcohol fuel plants producers: sizing; performance; natural resources; environmental aspects; and electric power generation. The environmental performance concept is introduced and a performance evaluation methodology are presented and applied. The results are also presented and criticized

  17. Comparison of the incidence of Listeria on equipment versus environmental sites within dairy processing plants.

    Science.gov (United States)

    Pritchard, T J; Flanders, K J; Donnelly, C W

    1995-08-01

    This study was undertaken to compare the incidence of Listeria contamination of processing equipment with that of the general dairy processing environment. A total of 378 sponge samples obtained from 21 dairy plants were analyzed for Listeria using three different enrichment media. Use of extended microbiological analysis allowed us to identify 26 Listeria positive sites which would have not been identified had a single test format been employed. Eighty (80) of 378 sites (21.2%) were identified as Listeria positive. Listeria innocua was isolated from 59 of the 80 (73.8%) positive samples, L. monocytogenes was identified in 35 (43.8%) of the positive samples, and L. seeligeri was isolated from 5 (6.3%) of the Listeria positive samples. Positive equipment samples were obtained from 6 of the 21 (28.6%) plants and 19 of the 21 (90.5%) plants had positive environmental sites. Seventeen of the 215 (7.9%) samples from equipment were positive for Listeria species. Eleven of these sites, including 3 holding tanks, 2 table tops, 3 conveyor/chain systems, a pasta filata wheel, a pint milk filler and a brine pre-filter machine, were positive for L. monocytogenes. Nineteen of the 21 (90.5%) plants had positive environmental sites. Sixty-three of the 163 (41.1%) samples from environmental sites were Listeria positive and 24 were positive for L. monocytogenes. Two-tailed student t-test analysis of the mean frequencies indicated that the level of contamination was significantly higher (p plant, and that greater emphasis needs to be placed on the cleaning and sanitizing of the plant environment.

  18. Microhabitat amelioration and reduced competition among understorey plants as drivers of facilitation across environmental gradients: towards a unifying framework

    Science.gov (United States)

    Soliveres, Santiago; Eldridge, David J.; Maestre, Fernando T.; Bowker, Matthew A.; Tighe, Matthew; Escudero, Adrián

    2015-01-01

    Studies of facilitative interactions as drivers of plant richness along environmental gradients often assume the existence of an overarching stress gradient equally affecting the performance of all the species in a given community. However, co-existing species differ in their ecophysiological adaptations, and do not experience the same stress level under particular environmental conditions. Moreover, these studies assume a unimodal richness-biomass curve, which is not as general as previously thought. We ignored these assumptions to assess changes in plant-plant interactions, and their effect on local species richness, across environmental gradients in semi-arid areas of Spain and Australia. We aimed to understand the relative importance of direct (microhabitat amelioration) and indirect (changes in the competitive relationships among the understorey species: niche segregation, competitive exclusion or intransitivity) mechanisms that might underlie the effects of nurse plants on local species richness. By jointly studying these direct and indirect mechanisms using a unifying framework, we were able to see how our nurse plants (trees, shrubs and tussock grasses) not only increased local richness by expanding the niche of neighbouring species, but also by increasing niche segregation among them, though the latter was not important in all cases. The outcome of the competition-facilitation continuum changed depending on the study area, likely because the different types of stress gradient considered. When driven by both rainfall and temperature, or rainfall alone, the community-wide importance of nurse plants remained constant (Spanish sites), or showed a unimodal relationship along the gradient (Australian sites). This study expands our understanding of the relative roles of plant-plant interactions and environmental conditions as drivers of local species richness in semi-arid environments. These results can also be used to refine predictions about the response of

  19. Microhabitat amelioration and reduced competition among understorey plants as drivers of facilitation across environmental gradients: towards a unifying framework.

    Science.gov (United States)

    Soliveres, Santiago; Eldridge, David J; Maestre, Fernando T; Bowker, Matthew A; Tighe, Matthew; Escudero, Adrián

    2011-11-20

    Studies of facilitative interactions as drivers of plant richness along environmental gradients often assume the existence of an overarching stress gradient equally affecting the performance of all the species in a given community. However, co-existing species differ in their ecophysiological adaptations, and do not experience the same stress level under particular environmental conditions. Moreover, these studies assume a unimodal richness-biomass curve, which is not as general as previously thought. We ignored these assumptions to assess changes in plant-plant interactions, and their effect on local species richness, across environmental gradients in semi-arid areas of Spain and Australia. We aimed to understand the relative importance of direct (microhabitat amelioration) and indirect (changes in the competitive relationships among the understorey species: niche segregation, competitive exclusion or intransitivity) mechanisms that might underlie the effects of nurse plants on local species richness. By jointly studying these direct and indirect mechanisms using a unifying framework, we were able to see how our nurse plants (trees, shrubs and tussock grasses) not only increased local richness by expanding the niche of neighbouring species, but also by increasing niche segregation among them, though the latter was not important in all cases. The outcome of the competition-facilitation continuum changed depending on the study area, likely because the different types of stress gradient considered. When driven by both rainfall and temperature, or rainfall alone, the community-wide importance of nurse plants remained constant (Spanish sites), or showed a unimodal relationship along the gradient (Australian sites). This study expands our understanding of the relative roles of plant-plant interactions and environmental conditions as drivers of local species richness in semi-arid environments. These results can also be used to refine predictions about the response of

  20. Environmental impact assessments of a fifth nuclear power plant unit in Finland

    International Nuclear Information System (INIS)

    Aurela, Jorma; Koivisto, Katarina

    2000-01-01

    This paper presents the results of president questionnaires and media monitoring of press cuttings concerned with siting of the new fifth in a row Finnish NPP. Two years ago both Fortum Power and Heat Oy and Teollisuuden Voima Oy (TVO) launched their Environmental impact assessment (EIA) procedures of a new nuclear power unit in Finland. The EIA procedures were launched to investigate the environmental impacts of a fifth nuclear power plant which possibly will be built in Loviisa or at Olkiluoto. In Finland there are four operating NPP units, two in Loviisa (Fortum) and two in Eurajoki, Olkiluoto (TVO). In the EIA procedure citizens and various associations and authorities have an opportunity to express their views on the matters related to the project. The Ministry of Trade and Industry (MTI) as the coordination authority arranges the organisation of the EIA hearings and the collection of statements and opinions. The EIA procedure in Finland takes place in two stages. The first stage i.e. the EIA programme describes the project and presents the plan on how the environmental effects are investigated and assessed. In the second stage the actual assessment of the environmental effects of the project will be submitted. Both Fortum and Teollisuuden Voima Oy (TVO) launched in spring 1998 their EIA procedures. The main alternatives are the Loviisa 3 project includes two plant type alternatives. The size of the plant is between 1000 and 1700 MWe, and the extension project of the Olkiluoto NPP to build a NPP unit of about 1000-1500 MWe at Olkiluoto. The EIA reports were submitted to the MTI in August 1999 and after that they were on display for two months for opinions and statements

  1. Environmental conditions regulate the impact of plants on cloud formation.

    Science.gov (United States)

    Zhao, D F; Buchholz, A; Tillmann, R; Kleist, E; Wu, C; Rubach, F; Kiendler-Scharr, A; Rudich, Y; Wildt, J; Mentel, Th F

    2017-02-20

    The terrestrial vegetation emits large amounts of volatile organic compounds (VOC) into the atmosphere, which on oxidation produce secondary organic aerosol (SOA). By acting as cloud condensation nuclei (CCN), SOA influences cloud formation and climate. In a warming climate, changes in environmental factors can cause stresses to plants, inducing changes of the emitted VOC. These can modify particle size and composition. Here we report how induced emissions eventually affect CCN activity of SOA, a key parameter in cloud formation. For boreal forest tree species, insect infestation by aphids causes additional VOC emissions which modifies SOA composition thus hygroscopicity and CCN activity. Moderate heat increases the total amount of constitutive VOC, which has a minor effect on hygroscopicity, but affects CCN activity by increasing the particles' size. The coupling of plant stresses, VOC composition and CCN activity points to an important impact of induced plant emissions on cloud formation and climate.

  2. 40 CFR 80.245 - How does a small refiner apply for a sulfur baseline?

    Science.gov (United States)

    2010-07-01

    ... sulfur baseline? 80.245 Section 80.245 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Provisions § 80.245 How does a small refiner apply for a sulfur baseline? (a) Any refiner seeking small refiner status must apply for a refinery sulfur baseline by the deadline under § 80.235 for each of the...

  3. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs

  4. Energy, environmental and operation aspects of a SRF-fired fluidized bed waste-to-energy plant.

    Science.gov (United States)

    De Gisi, Sabino; Chiarelli, Agnese; Tagliente, Luca; Notarnicola, Michele

    2018-03-01

    A methodology based on the ISO 14031:2013 guideline has been developed and applied to a full-scale fluidized bed waste to energy plant (WtE) burning solid recovered fuel (SRF). With reference to 3years of operation, the data on energy and environmental performance, on raw materials consumptions such as sand and diesel fuel, accidental reasons of plant shutdown, have been acquired and analyzed. The obtained results have allowed to quantify the energy and environmental performance of the WtE plant under investigation by varying the amount and mixings of the inlet waste, available in form of thickened and fluff (similar to coriander) SRF. In terms of the energy performance, the fluidized bed technology applied to the SRF was able to guarantee an adequate production of electricity (satisfying the market demands), showing a relative flexibility with respect to the inlet waste. In terms of net energy production efficiency, the plant showed values in the range of 13.8-14.9% in line with similar installations. In terms of the environmental performance, the adoption of a cleaning system based on SNCR (Selective Non Catalitic Reduction)+semi-dry scrubbing+Fabric filter generated emissions usually well below the limits set by the EU Directive 2000/76/EC as well as the Italian Law 46/2014 (more restrictive) with reference to all the key parameters. In terms of the plant shutdown, the majority of problems focused on the combustion chamber and boiler due to the erosion of the refractory material of the furnace as well as to the breaking of the superheaters of the boiler. In contrast, the mechanical and electrical causes, along with those related to the control and instrumentation system, were of secondary importance. The sand bed de-fluidization was also among the leading causes of a frequent plant shutdown. In particular, results showed how although the SRF presents standard characteristics, the use of different mixtures may affect the number of plant shutdowns. The full

  5. Environmental assessment for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    The Atomic Energy Act and Nuclear Regulatory Commission (NRC) regulations provide for the renewal of nuclear power plant operating licenses beyond their initial 40-year term. The Act and NRC regulations, however, do not specify the procedures, criteria, and standards that must be satisfied in order to renew a license. The NRC is promulgating a rule (10 CFR Part 54) to codify such requirements prior to the receipt of applications for license renewal. The NRC has assessed the possible environmental effects of promulgating requirements in 10 CFR Part 54 now rather than employing such requirements in an ad hoc manner in individual licensing actions. The final part 54 rule requires the development of information and analyses to identify aging problems of systems, structures, and components unique to license renewal that will be of concern during the period of extended operation and will not be controlled by existing effective programs. In general, licensee activities for license renewal may involve replacement, refurbishment, inspection, testing, or monitoring. Such actions will be generally be within the range of similar actions taken for plants during the initial operating term. These actions would be primarily confined within the plants with potential for only minor disruption to the environment. It is unlikely that these actions would change the operating conditions of plants in ways that would change the environmental effects already being experienced. Relicensing under existing regulations would also be primarily focused on aging degradation and would likely result in requirements similar to those that will result from relicensing under the final rule

  6. Baseline Radioactivity Measurements In The Vicinity Of A Gold ...

    African Journals Online (AJOL)

    Western Region, Ghana) to obtain baseline radioactivity data prior to the installation of Cs-137 nuclear density gauges for quality control measure-ment of the density of slurry in the pipelines at the plant. A survey meter, gamma spectrometry and ...

  7. 78 FR 26401 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding...

    Science.gov (United States)

    2013-05-06

    ... Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding of No Significant Impact... Neck Plant (HNP) Independent Spent Fuel Storage Installation (ISFSI). CYAPCO stated that the exemption...-rm/adams.html . From this site, you can access the NRC's ADAMS, which provides text and image files...

  8. Environmental impact assessment of a WtE plant after structural upgrade measures.

    Science.gov (United States)

    Passarini, Fabrizio; Nicoletti, Monica; Ciacci, Luca; Vassura, Ivano; Morselli, Luciano

    2014-04-01

    The study focuses on analysing the evolution of environmental impacts caused by a medium-large Italian WtE plant before and after revamping and maintenance operations, with the aim of providing an evaluation of how much these structural upgrade measures may affect the total environmental performance. LCA methodology was applied for the modelling and comparison of six WtE scenarios, each describing the main structural upgrades carried out in the plant over the years 1996-2011. The comparison was conducted by adopting 1ton of MSW as the functional unit, and the net contribution from energy recovery to power generation was distinguished by defining consistent national grid electricity mixes for every year considered. The Ecoindicator99 2.09 impact assessment method was used to evaluate the contribution to midpoint and endpoint categories (e.g. carcinogens, respiratory inorganics and organics, climate change, damage to human health). Lastly, the "Pedigree quality matrix" was applied to verify the reliability and robustness of the model created. As expected, the results showed better environmental scores after both the implementation of new procedures and the integration of operations. However, while a net reduction of air emissions seems to be achievable through dedicated flue gas treatment technologies, outcomes underscored potentials for improving the management of bottom ash through the adoption of alternative options aimed to use that solid residue mainly as filler, and to decrease risks from its current disposal in landfill. If the same effort that is put into flue gas treatment were devoted to energy recovery, the targets for the WtE plant could be easily met, achieving a higher sustainability. This aspect is even more complex: national policies for implementing greener and renewable energy sources would result in a lower impact of the national energy mix and, hence, in a lower net avoided burden from energy recovery. The study confirmed the expected improvements

  9. Prevalence of L. monocytogenes in environmental samples collected in dairy plants of Sassari Province, Italy

    Directory of Open Access Journals (Sweden)

    Giovanni Terrosu

    2015-09-01

    Full Text Available Listeria (L. monocytogenes is frequently isolated from food production environment and often persists in dairy plants despite vigorous sanitation regimes. In recent years several alert notifications were sent to Rapid Alert System for Food Products system as a consequence of Listeria monocytogenes contamination of ricotta cheese. After the alert of 2012, competent authority (Local Health Unit of Sassari Province organised an environmental monitoring plan with the partnership of the Institute for Experimental Veterinary Medicine of Sardinia to verify analysis of dairy plants own-check according to Regulation (EC N° 2073/05 and further modifications. In 2014 n. 665 processing areas samples of n. 50 dairy plants of Sassari Province were examined. UNI EN ISO 11290-1:2005 for detection of L. monocytogenes was used. Non-compliance in n. 5 diary plants are observed (n. 8 positive samples. Post-non-compliance environmental sanitisation was efficient and own-check plans included appropriate corrective actions.

  10. United States experience in environmental cost-benefit analysis for nuclear power plants with implications for developing countries

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1980-08-01

    Environmental cost-benefit analysis in the United States involves a comparison of diverse societal impacts of the proposed developments and its alternatives. Regarding nuclear power plant licensing actions, such analyses include the need for base-load electrical generating capacity versus the no-action alternative; alternative sources of energy; alternative sites for the proposed nuclear plants; and alternative technologies for mitigating environmental impacts. Many U.S. experiences and environmental assessment practices and comparative resource requirements presented in this report will not provide a wholly reliable reflection of the precise situation of each country. Nevertheless, the procedural and substantive issues encountered by the United States in nuclear power plant licensing may exhibit a number of important, if rough, parallelisms for other countries. Procedural issues dealt with include: the scoping of alternatives and impact issues; the problem of balancing incommensurable impacts; and treating uncertainty in measuring or forecasting certain kinds of environmental impacts. Although substantive environmental impact issues will vary appreciably among nations, it is to be expected that many of the substantive impact issues such as impacts on biota, community-related effects, and aesthetic impacts will also have some measure of universal interest to other countries

  11. Environmental impact statement on the siting of nuclear power plants: scoping summary report

    International Nuclear Information System (INIS)

    1981-12-01

    The NRC staff has completed its scoping process for the Environmental Impact Statement for the revision of its regulations on the siting of nuclear power plants. The rulemaking and environmental review have been focused to concentrate on significant issues and alternatives and to delete items from the rulemaking on which it is not appropriate to proceed at this time. A brief discussion of the major comments is included

  12. Improvement of environmental aspects of thermal power plant operation by advanced control concepts

    Directory of Open Access Journals (Sweden)

    Mikulandrić Robert

    2012-01-01

    Full Text Available The necessity of the reduction of greenhouse gas emissions, as formulated in the Kyoto Protocol, imposes the need for improving environmental aspects of existing thermal power plants operation. Improvements can be reached either by efficiency increment or by implementation of emission reduction measures. Investments in refurbishment of existing plant components or in plant upgrading by flue gas desulphurization, by primary and secondary measures of nitrogen oxides reduction, or by biomass co-firing, are usually accompanied by modernisation of thermal power plant instrumentation and control system including sensors, equipment diagnostics and advanced controls. Impact of advanced control solutions implementation depends on technical characteristics and status of existing instrumentation and control systems as well as on design characteristics and actual conditions of installed plant components. Evaluation of adequacy of implementation of advanced control concepts is especially important in Western Balkan region where thermal power plants portfolio is rather diversified in terms of size, type and commissioning year and where generally poor maintenance and lack of investments in power generation sector resulted in high greenhouse gases emissions and low efficiency of plants in operation. This paper is intended to present possibilities of implementation of advanced control concepts, and particularly those based on artificial intelligence, in selected thermal power plants in order to increase plant efficiency and to lower pollutants emissions and to comply with environmental quality standards prescribed in large combustion plant directive. [Acknowledgements. This paper has been created within WBalkICT - Supporting Common RTD actions in WBCs for developing Low Cost and Low Risk ICT based solutions for TPPs Energy Efficiency increasing, SEE-ERA.NET plus project in cooperation among partners from IPA SA - Romania, University of Zagreb - Croatia and Vinca

  13. 40 CFR 80.910 - How does a refiner or importer apply for a toxics baseline?

    Science.gov (United States)

    2010-07-01

    ... for a toxics baseline? 80.910 Section 80.910 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Toxics Baseline Determination § 80.910 How does a refiner or importer apply for a toxics baseline? (a)(1) A refiner or importer...

  14. Environmental impact of coal industry and thermal power plants in India.

    Science.gov (United States)

    Mishra, U C

    2004-01-01

    Coal is the only natural resource and fossil fuel available in abundance in India. Consequently, it is used widely as a thermal energy source and also as fuel for thermal power plants producing electricity. India has about 90,000 MW installed capacity for electricity generation, of which more than 70% is produced by coal-based thermal power plants. Hydro-electricity contributes about 25%, and the remaining is mostly from nuclear power plants (NPPs). The problems associated with the use of coal are low calorific value and very high ash content. The ash content is as high as 55-60%, with an average value of about 35-40%. Further, most of the coal is located in the eastern parts of the country and requires transportation over long distances, mostly by trains, which run on diesel. About 70% oil is imported and is a big drain on India's hard currency. In the foreseeable future, there is no other option likely to be available, as the nuclear power programme envisages installing 20,000 MWe by the year 2020, when it will still be around 5% of the installed capacity. Hence, attempts are being made to reduce the adverse environmental and ecological impact of coal-fired power plants. The installed electricity generating capacity has to increase very rapidly (at present around 8-10% per annum), as India has one of the lowest per capita electricity consumptions. Therefore, the problems for the future are formidable from ecological, radio-ecological and pollution viewpoints. A similar situation exists in many developing countries of the region, including the People's Republic of China, where coal is used extensively. The paper highlights some of these problems with the data generated in the author's laboratory and gives a brief description of the solutions being attempted. The extent of global warming in this century will be determined by how developing countries like India manage their energy generation plans. Some of the recommendations have been implemented for new plants

  15. 33 CFR Appendix C to Part 273 - Information Requirements for Aquatic Plant Control Program Environmental Impact Statements

    Science.gov (United States)

    2010-07-01

    ... Aquatic Plant Control Program Environmental Impact Statements C Appendix C to Part 273 Navigation and... Environmental Impact Statements 1. Description of the problem. a. Pests. Identify the pest to be controlled by.... Relationship to environmental situation. Non-target organisms and integrated pest management programs. 2...

  16. Disentangling environmental correlates of vascular plant biodiversity in a Mediterranean hotspot.

    Science.gov (United States)

    Molina-Venegas, Rafael; Aparicio, Abelardo; Pina, Francisco José; Valdés, Benito; Arroyo, Juan

    2013-10-01

    We determined the environmental correlates of vascular plant biodiversity in the Baetic-Rifan region, a plant biodiversity hotspot in the western Mediterranean. A catalog of the whole flora of Andalusia and northern Morocco, the region that includes most of the Baetic-Rifan complex, was compiled using recent comprehensive floristic catalogs. Hierarchical cluster analysis (HCA) and detrended correspondence analysis (DCA) of the different ecoregions of Andalusia and northern Morocco were conducted to determine their floristic affinities. Diversity patterns were studied further by focusing on regional endemic taxa. Endemic and nonendemic alpha diversities were regressed to several environmental variables. Finally, semi-partial regressions on distance matrices were conducted to extract the respective contributions of climatic, altitudinal, lithological, and geographical distance matrices to beta diversity in endemic and nonendemic taxa. We found that West Rifan plant assemblages had more similarities with Andalusian ecoregions than with other nearby northern Morocco ecoregions. The endemic alpha diversity was explained relatively well by the environmental variables related to summer drought and extreme temperature values. Of all the variables, geographical distance contributed by far the most to spatial turnover in species diversity in the Baetic-Rifan hotspot. In the Baetic range, elevation was the most significant driver of nonendemic species beta diversity, while lithology and elevation were the main drivers of endemic beta diversity. Despite the fact that Andalusia and northern Morocco are presently separated by the Atlantic Ocean and the Mediterranean Sea, the Baetic and Rifan mountain ranges have many floristic similarities - especially in their western ranges - due to past migration of species across the Strait of Gibraltar. Climatic variables could be shaping the spatial distribution of endemic species richness throughout the Baetic-Rifan hotspot. Determinants

  17. Environmental assessment for the Plating Shop Replacement, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-03-01

    The existing of Y-12 Plant Plating Shop provides vital support functions for the US Department of Energy (DOE) Defense Programs operations. In addition to weapon component plating, the facility performs other plating services to support existing operations for the Y-12 Plant, other DOE facilities, and other federal agencies. In addition, the facility would also provide essential deplating services for weapons reclamation and teardown. The existing Y-12 Plant Plating Shop is presently located in a structure which is rapidly deteriorating and obsolete. The existing building structure was originally designed to house a steam plant, not chemical plating operations. As such, vapors from plating operations have deteriorated the structure to a point where a new facility is needed for continued safe operations. The potential environmental impacts of the proposed action was anticipated to be minimal and would affect no environmentally sensitive areas. Some short-term construction- and demolition-related effects would occur in an already highly industrialized setting. These include temporarily disturbing 72,000 square feet of land for the new plating shop and related site preparation activities, constructing a permanent building on part of the area, and using 80 construction personnel over a period of 18 months for site preparation and construction. Demolition effects vary depending on the environmentally suitable option selected, but they could involve as much as 262 cubic yards of concrete rubble and approximately 1600 cubic yards of soil disposed as waste. Either 1600 cubic yards of fresh soil or 1850 yards of clay and fresh soil could be required. Soil erosion would be minimal. Approximately 20 construction personnel would be involved for 12 months in demolition activities

  18. Environmental issues and process risks for operation of carbon capture plant

    Directory of Open Access Journals (Sweden)

    Lajnert Radosław

    2018-01-01

    Full Text Available The scope of this publication is a presentation of environmental issues and process risks connected with operation an installation for carbon capture from waste gas. General technological assumptions, typical for demonstration plant for carbon capture from waste gas (DCCP with application of two different solutions – 30% water solution of monoethanoloamine (MEA and water solution with 30% AMP (2-amino-2-methyl-1-propanol and 10% piperazine have been described. The concept of DCCP installation was made for Łaziska Power Plant in Łaziska Górne owned by TAURON Wytwarzanie S.A. Main hazardous substances, typical for such installation, which can be dangerous for human life and health or for the environment have been presented. Pollution emission to the air, noise emission, waste water and solid waste management have been described. The environmental impact of the released substances has been stated. Reference to emission standards specified in regulations for considered substances has been done. Principles of risk analysis have been presented and main hazards in carbon dioxide absorption node and regeneration node have been evaluated.

  19. Environmental issues and process risks for operation of carbon capture plant

    Science.gov (United States)

    Lajnert, Radosław; Nowak, Martyna; Telenga-Kopyczyńska, Jolanta

    2018-01-01

    The scope of this publication is a presentation of environmental issues and process risks connected with operation an installation for carbon capture from waste gas. General technological assumptions, typical for demonstration plant for carbon capture from waste gas (DCCP) with application of two different solutions - 30% water solution of monoethanoloamine (MEA) and water solution with 30% AMP (2-amino-2-methyl-1-propanol) and 10% piperazine have been described. The concept of DCCP installation was made for Łaziska Power Plant in Łaziska Górne owned by TAURON Wytwarzanie S.A. Main hazardous substances, typical for such installation, which can be dangerous for human life and health or for the environment have been presented. Pollution emission to the air, noise emission, waste water and solid waste management have been described. The environmental impact of the released substances has been stated. Reference to emission standards specified in regulations for considered substances has been done. Principles of risk analysis have been presented and main hazards in carbon dioxide absorption node and regeneration node have been evaluated.

  20. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    International Nuclear Information System (INIS)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act

  1. Infrared thermometry and the crop water stress index. I. History, theory, and baselines

    International Nuclear Information System (INIS)

    Gardner, B.R.; Nielsen, D.C.; Shock, C.C.

    1992-01-01

    Development of portable infrared thermometers and the definition of the Crop Water Stress Index (CWSI) have led to widespread interest in infrared thermometry to monitor water stress and schedule irrigations. But the CWSI concept is still new and poorly understood by many. The purpose of this paper is to review the definition of CWSI, and the determination and interpretation of the non-water-stressed baselines used to compute CWSI. The non-water-stressed baseline equation normalizes the canopy minus air temperature differential for variations in vapor pressure deficit. Non-water-stressed baselines can be determined empirically from measurements of canopy and air temperatures and vapor pressure deficit, made diurnally on a single day, or at a single time of day over many days, on well-watered plants. The value of the maximum canopy minus air temperature differential under maximum water stress should also be determined empirically. Causes for CWSI values falling outside of the defined 0 to 10 unit range are reviewed. Non-water-stressed baselines may shift with plant growth stage. Effective use of CWSI is dependent on understanding the definition of CWSI, and the proper determination and use of non-water-stressed baselines. (author)

  2. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs.

  3. Genome-wide analysis of protein disorder in Arabidopsis thaliana: implications for plant environmental adaptation.

    Science.gov (United States)

    Pietrosemoli, Natalia; García-Martín, Juan A; Solano, Roberto; Pazos, Florencio

    2013-01-01

    Intrinsically disordered proteins/regions (IDPs/IDRs) are currently recognized as a widespread phenomenon having key cellular functions. Still, many aspects of the function of these proteins need to be unveiled. IDPs conformational flexibility allows them to recognize and interact with multiple partners, and confers them larger interaction surfaces that may increase interaction speed. For this reason, molecular interactions mediated by IDPs/IDRs are particularly abundant in certain types of protein interactions, such as those of signaling and cell cycle control. We present the first large-scale study of IDPs in Arabidopsis thaliana, the most widely used model organism in plant biology, in order to get insight into the biological roles of these proteins in plants. The work includes a comparative analysis with the human proteome to highlight the differential use of disorder in both species. Results show that while human proteins are in general more disordered, certain functional classes, mainly related to environmental response, are significantly more enriched in disorder in Arabidopsis. We propose that because plants cannot escape from environmental conditions as animals do, they use disorder as a simple and fast mechanism, independent of transcriptional control, for introducing versatility in the interaction networks underlying these biological processes so that they can quickly adapt and respond to challenging environmental conditions.

  4. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    International Nuclear Information System (INIS)

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-01-01

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also

  5. Advanced digital I ampersand C systems in nuclear power plants: Risk- sensitivities to environmental stressors

    International Nuclear Information System (INIS)

    Hassan, M.; Vesely, W.E.

    1996-01-01

    Microprocessor-based advanced digital systems are being used for upgrading analog instrumentation and control (I ampersand C) systems in nuclear power plants (NPPs) in the United States. A concern with using such advanced systems for safety-related applications in NPPs is the limited experience with this equipment in these environments. In this study, we investigate the risk effects of environmental stressors by quantifying the plant's risk-sensitivities to them. The risk- sensitivities are changes in plant risk caused by the stressors, and are quantified by estimating their effects on I ampersand C failure occurrences and the consequent increase in risk in terms of core damage frequency (CDF). We used available data, including military and NPP operating experience, on the effects of environmental stressors on the reliability of digital I ampersand C equipment. The methods developed are applied to determine and compare risk-sensitivities to temperature, humidity, vibration, EMI (electromagnetic interference) from lightning and smoke as stressors in an example plant using a PRA (Probabilistic Risk Assessment). Uncertainties in the estimates of the stressor effects on the equipment's reliability are expressed in terms of ranges for risk-sensitivities. The results show that environmental stressors potentially can cause a significant increase in I ampersand C contributions to the CDF. Further, considerable variations can be expected in some stressor effects, depending on where the equipment is located

  6. Configuration management of plant modifications for nuclear power plants

    International Nuclear Information System (INIS)

    Ritsch, W.J.

    1987-01-01

    Due to the increasing complexity of nuclear power plant operation, regulatory pressure, and the large numbers of people required to operate and support the stations, the control of plant modifications at these plants needs to be expanded and improved. The aerospace and defense industries, as well as the owners or operators of large energy projects have established configuration management programs (CMPs) to control plant design changes. These programs are composed of well-defined functions for identifying, evaluating, recording, tracking, issuing, and documenting the established baseline conditions, as well as required changes to these baseline conditions. The purpose of this paper is to describe a recommended CMP for plant modifications consisting of a computerized data base installed on the utility's computer to provide a central storage of plant design and operations data necessary to control the following activities as they are affected by plant design changes: training; record management; operations; maintenance; health physics; planning/scheduling; procurement/inventory control; outage management (including modifications); and emergency response

  7. Sampling and chemical analysis in environmental samples around Nuclear Power Plants and some environmental samples

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Yong Woo; Han, Man Jung; Cho, Seong Won; Cho, Hong Jun; Oh, Hyeon Kyun; Lee, Jeong Min; Chang, Jae Sook [KORTIC, Taejon (Korea, Republic of)

    2002-12-15

    Twelve kinds of environmental samples such as soil, seawater, underground water, etc. around Nuclear Power Plants(NPPs) were collected. Tritium chemical analysis was tried for the samples of rain water, pine-needle, air, seawater, underground water, chinese cabbage, a grain of rice and milk sampled around NPPs, and surface seawater and rain water sampled over the country. Strontium in the soil that sere sampled at 60 point of district in Korea were analyzed. Tritium were sampled at 60 point of district in Korea were analyzed. Tritium were analyzed in 21 samples of surface seawater around the Korea peninsular that were supplied from KFRDI(National Fisheries Research and Development Institute). Sampling and chemical analysis environmental samples around Kori, Woolsung, Youngkwang, Wooljin Npps and Taeduk science town for tritium and strontium analysis was managed according to plans. Succeed to KINS after all samples were tried.

  8. A systematic review of the recent ecological literature on cushion plants: champions of plant facilitation

    Directory of Open Access Journals (Sweden)

    A. M. Reid

    2010-09-01

    Full Text Available Cushion-forming plant species are found in alpine and polar environments around the world. They modify the microclimate, thereby facilitating other plant species. Similar to the effectiveness of shrubs as a means to study facilitation in arid and semi-arid environments, we explore the potential for cushion plant species to expand the generality of research on this contemporary ecological interaction. A systematic review was conducted to determine the number of publications and citation frequency on relevant ecological topics whilst using shrub literature as a baseline to assess relative importance of cushions as a focal point for future ecological research. Although there are forty times more shrub articles, mean citations per paper is comparable between cushion and shrub literature. Furthermore, the scope of ecological research topics studied using cushions is broad including facilitation, competition, environmental gradients, life history, genetics, reproduction, community, ecosystem and evolution. The preliminary ecological evidence to date also strongly suggests that cushion plants can be keystone species in their ecosystems. Hence, ecological research on net interactions including facilitation and patterns of diversity can be successfully examined using cushion plants, and this is particularly timely given expectations associated with a changing climate in these regions.

  9. Transgenic Plants as Sensors of Environmental Pollution Genotoxicity

    Directory of Open Access Journals (Sweden)

    Olga Kovalchuk

    2008-03-01

    Full Text Available Rapid technological development is inevitably associated with manyenvironmental problems which primarily include pollution of soil, water and air. In manycases, the presence of contamination is difficult to assess. It is even more difficult toevaluate its potential danger to the environment and humans. Despite the existence ofseveral whole organism-based and cell-based models of sensing pollution and evaluationof toxicity and mutagenicity, there is no ideal system that allows one to make a quick andcheap assessment. In this respect, transgenic organisms that can be intentionally altered tobe more sensitive to particular pollutants are especially promising. Transgenic plantsrepresent an ideal system, since they can be grown at the site of pollution or potentiallydangerous sites. Plants are ethically more acceptable and esthetically more appealing thananimals as sensors of environmental pollution. In this review, we will discuss varioustransgenic plant-based models that have been successfully used for biomonitoringgenotoxic pollutants. We will also discuss the benefits and potential drawbacks of thesesystems and describe some novel ideas for the future generation of efficient transgenicphytosensors.

  10. An Extended Chemical Plant Environmental Protection Game on Addressing Uncertainties of Human Adversaries

    Science.gov (United States)

    Wang, Rongxiao; Chen, Feiran; Wang, Yiping; Qiu, Xiaogang

    2018-01-01

    Chemical production activities in industrial districts pose great threats to the surrounding atmospheric environment and human health. Therefore, developing appropriate and intelligent pollution controlling strategies for the management team to monitor chemical production processes is significantly essential in a chemical industrial district. The literature shows that playing a chemical plant environmental protection (CPEP) game can force the chemical plants to be more compliant with environmental protection authorities and reduce the potential risks of hazardous gas dispersion accidents. However, results of the current literature strictly rely on several perfect assumptions which rarely hold in real-world domains, especially when dealing with human adversaries. To address bounded rationality and limited observability in human cognition, the CPEP game is extended to generate robust schedules of inspection resources for inspection agencies. The present paper is innovative on the following contributions: (i) The CPEP model is extended by taking observation frequency and observation cost of adversaries into account, and thus better reflects the industrial reality; (ii) Uncertainties such as attackers with bounded rationality, attackers with limited observation and incomplete information (i.e., the attacker’s parameters) are integrated into the extended CPEP model; (iii) Learning curve theory is employed to determine the attacker’s observability in the game solver. Results in the case study imply that this work improves the decision-making process for environmental protection authorities in practical fields by bringing more rewards to the inspection agencies and by acquiring more compliance from chemical plants. PMID:29584679

  11. An Extended Chemical Plant Environmental Protection Game on Addressing Uncertainties of Human Adversaries.

    Science.gov (United States)

    Zhu, Zhengqiu; Chen, Bin; Qiu, Sihang; Wang, Rongxiao; Chen, Feiran; Wang, Yiping; Qiu, Xiaogang

    2018-03-27

    Chemical production activities in industrial districts pose great threats to the surrounding atmospheric environment and human health. Therefore, developing appropriate and intelligent pollution controlling strategies for the management team to monitor chemical production processes is significantly essential in a chemical industrial district. The literature shows that playing a chemical plant environmental protection (CPEP) game can force the chemical plants to be more compliant with environmental protection authorities and reduce the potential risks of hazardous gas dispersion accidents. However, results of the current literature strictly rely on several perfect assumptions which rarely hold in real-world domains, especially when dealing with human adversaries. To address bounded rationality and limited observability in human cognition, the CPEP game is extended to generate robust schedules of inspection resources for inspection agencies. The present paper is innovative on the following contributions: (i) The CPEP model is extended by taking observation frequency and observation cost of adversaries into account, and thus better reflects the industrial reality; (ii) Uncertainties such as attackers with bounded rationality, attackers with limited observation and incomplete information (i.e., the attacker's parameters) are integrated into the extended CPEP model; (iii) Learning curve theory is employed to determine the attacker's observability in the game solver. Results in the case study imply that this work improves the decision-making process for environmental protection authorities in practical fields by bringing more rewards to the inspection agencies and by acquiring more compliance from chemical plants.

  12. An Extended Chemical Plant Environmental Protection Game on Addressing Uncertainties of Human Adversaries

    Directory of Open Access Journals (Sweden)

    Zhengqiu Zhu

    2018-03-01

    Full Text Available Chemical production activities in industrial districts pose great threats to the surrounding atmospheric environment and human health. Therefore, developing appropriate and intelligent pollution controlling strategies for the management team to monitor chemical production processes is significantly essential in a chemical industrial district. The literature shows that playing a chemical plant environmental protection (CPEP game can force the chemical plants to be more compliant with environmental protection authorities and reduce the potential risks of hazardous gas dispersion accidents. However, results of the current literature strictly rely on several perfect assumptions which rarely hold in real-world domains, especially when dealing with human adversaries. To address bounded rationality and limited observability in human cognition, the CPEP game is extended to generate robust schedules of inspection resources for inspection agencies. The present paper is innovative on the following contributions: (i The CPEP model is extended by taking observation frequency and observation cost of adversaries into account, and thus better reflects the industrial reality; (ii Uncertainties such as attackers with bounded rationality, attackers with limited observation and incomplete information (i.e., the attacker’s parameters are integrated into the extended CPEP model; (iii Learning curve theory is employed to determine the attacker’s observability in the game solver. Results in the case study imply that this work improves the decision-making process for environmental protection authorities in practical fields by bringing more rewards to the inspection agencies and by acquiring more compliance from chemical plants.

  13. Bio monitors for the determination of baseline concentrations of environmentally important elements and their use as reference material

    International Nuclear Information System (INIS)

    Cortes, Eduardo; Gras, Nuri

    1997-01-01

    The use of selected biomonitors could help to determine baseline concentrations of important elements and, at the same time, contribute with information as regards the pollution status of given areas. In this study, several types of molluscs, sediments, sea water, soil river water and vegetables were used as biomonitors. A number of chemical elements (As, Cd, Co, Cr, Cu, Fe, Hg, Mn, Pb, Sb, Sc, Se, V and Zn) were determine using neutron activation analysis, atomic absorption spectrometry inductively coupled plasma emission spectroscopy and stripping voltametry. The results indicated a good homogeneity of the samples for the elements As, Cu, Fe and Zn which are the most relevant analites for the area under study. A database with the analytical data and relevant information of the sampling site and meteorological conditions, is being implemented. To help the laboratories to reach the necessary accuracy and precision in these analyses, the Chilean Nucleae Energy Commission (CCHEN) have implemented a project aiming at the production of (secondary) reference materials (RMs) for quality control procedures. The matrices chosen initially as candidate RMs were molluscs since several laboratories are involved in the analysis of them. Samples of clamps and mussels were collected at three different bays in the coast of northern Chile, according to the information obtained from the baseline determination project. A sample preparation laboratory was implemented for handling samples of biological and environmental origins and to serve as a pilot laboratory for the preparation of modest amounts of RMs. The samples were handled and prepared according to the same protocols developed for baseline determination project. This preliminary effort has permitted to learn and develop procedures for the preparation of secondary RMs to satisfy the requirements of national laboratories

  14. 75 FR 6224 - Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental...

    Science.gov (United States)

    2010-02-08

    ... affect radiation exposures to plant workers and members of the public. Therefore, no changes or different... socioeconomic resources. Therefore, no changes to or different types of non-radiological environmental impacts...

  15. Geochemical baseline studies of soil in Finland

    Science.gov (United States)

    Pihlaja, Jouni

    2017-04-01

    The soil element concentrations regionally vary a lot in Finland. Mostly this is caused by the different bedrock types, which are reflected in the soil qualities. Geological Survey of Finland (GTK) is carrying out geochemical baseline studies in Finland. In the previous phase, the research is focusing on urban areas and mine environments. The information can, for example, be used to determine the need for soil remediation, to assess environmental impacts or to measure the natural state of soil in industrial areas or mine districts. The field work is done by taking soil samples, typically at depth between 0-10 cm. Sampling sites are chosen to represent the most vulnerable areas when thinking of human impacts by possible toxic soil element contents: playgrounds, day-care centers, schools, parks and residential areas. In the mine districts the samples are taken from the areas locating outside the airborne dust effected areas. Element contents of the soil samples are then analyzed with ICP-AES and ICP-MS, Hg with CV-AAS. The results of the geochemical baseline studies are published in the Finnish national geochemical baseline database (TAPIR). The geochemical baseline map service is free for all users via internet browser. Through this map service it is possible to calculate regional soil baseline values using geochemical data stored in the map service database. Baseline data for 17 elements in total is provided in the map service and it can be viewed on the GTK's web pages (http://gtkdata.gtk.fi/Tapir/indexEN.html).

  16. Marine-ecosystem analysis for the Kori nuclear power plant

    International Nuclear Information System (INIS)

    Lee, J.H.; Kim, Y.H.

    1979-01-01

    The effects of radioactive effluents and warm water discharged from the plant on aquatic ecosystem is one of the primary considerations in evaluating the impact due to the operation of the nuclear power plant. Biological alteration of aquatic ecosystems may be resulted from radioactive effluents, thermal pollution and chemical releases; there is also the possible synergistic effect, that is, the combination of the above stresses, which may cause an effect greater than that of the sum of the individual effects. This report deals with species diversity and seasonal vegetation of phytoplankton, marine algae and microorganisms, radioactive contamination of marine organisms, and lateral distribution of sea water temperature from discharge point. The present investigation is designed to provide a partial baseline information for environmental safety against Kori nuclear power plant. (author)

  17. Environmental Assessment for Hazardous Waste Staging Facility, Pantex Plant, Amarillo, Texas

    International Nuclear Information System (INIS)

    1993-06-01

    This Environmental Assessment (EA) has been prepared pursuant to the implementing regulations to the National Environmental Policy Act (NEPA), which require federal agencies to assess the environmental impacts of a proposed action to determine whether that action requires the preparation of an Environmental Impact Statement (EIS) or if a Finding of No Significant Impact (FONSI) can be issued. The Pantex Plant does not possess permanent containerized waste staging facilities with integral secondary containment or freeze protection. Additional deficiencies associated with some existing staging facilities include: no protection from precipitation running across the staging pads; lack of protection against weathering; and facility foundations not capable of containing leaks, spills or accumulated precipitation. These shortcomings have raised concerns with respect to requirements under Section 3001 of the Resource Conservation and Recovery Act (RCRA). Deficiencies for these waste staging areas were also cited by a government audit team (Tiger Team) as Action Items. The provision for the staging of hazardous, mixed, and low level waste is part of the no-action altemative in the Programmatic Environmental Impact Statement for the integrated ER/WM program. Construction of this proposed project will not prejudice whether or not this integration will occur, or how

  18. Social and environmental aspects of a sewage sludge irradiation plant; Aspectos sociales y ambientales de una planta irradiadora de barros

    Energy Technology Data Exchange (ETDEWEB)

    Mangussi, J [Universidad Nacional de Tucuman (Argentina). Dept. de Fisica

    2000-07-01

    The critical environmental parameters involved in an environmental impact study for a 700,000 Ci of {sup 60}Co sewage sludge irradiation plant are described and analyzed. The plant is the first that will operate in Argentina and it is located in a town of 500,000 inhabitants, in an agricultural region with no nuclear tradition. The position of the environmental authorities and of the public opinion is analyzed. Possible information alternatives are proposed. (author)

  19. Dispersion of pollutants, environmental externalities due to a pulverized coal power plant and their effect on the cost of electricity

    International Nuclear Information System (INIS)

    Czarnowska, Lucyna; Frangopoulos, Christos A.

    2012-01-01

    Energy conversion systems generate pollution that causes damages to the environment and the society. The objective of this work is to study the dispersion of pollutants and assess the environmental and social cost due to pollution from such a system. For this purpose, a pulverized coal power plant is selected. Using thermodynamic principles combined with empirical techniques, the quantities of pollutants emitted by the plant are estimated. Then, using the EcoSenseWeb software, which is based on the results of the ExternE project, the external environmental cost (externalities) of pollution is assessed. The plant is considered as located in four different cities in Poland and the externalities are calculated for each city separately. It is shown that the external environmental cost has a strong influence on the unit cost of electricity. In addition, the dispersion of pollutants is presented for the plant located in Olsztyn city. Furthermore, the plant is considered as located near the capitals of European countries and the environmental externalities are calculated for each city. The neighboring countries that are strongly affected by the plant in each particular city are identified. The sensitivity of the unit cost of electricity to certain important parameters is investigated. -- Highlights: ► The external cost of pollution has a significant impact on the cost of electricity. ► The results depend on the particular plant, location and level (local-global). ► Externalities make the installation of abatement equipment economical. ► The source location of emissions has a significant effect on the external cost. ► The transboundary pollution has a strong effect on the environmental cost.

  20. Cooccurrence patterns of plants and soil bacteria in the high-alpine subnival zone track environmental harshness

    Directory of Open Access Journals (Sweden)

    Andrew J. King

    2012-10-01

    Full Text Available Plants and soil microorganisms interact to play a central role in ecosystem functioning. To determine the potential importance of biotic interactions in shaping the distributions of these organisms in a high-alpine subnival landscape, we examine cooccurrence patterns between plant species and bulk-soil bacteria abundances. In this context, a cooccurrence relationship reflects a combination of several assembly processes: that both parties can disperse to the site, that they can survive the abiotic environmental conditions, and that interactions between the biota either facilitate survival or allow for coexistence. Across the entire landscape, 31% of the bacterial sequences in this dataset were significantly correlated to the abundance distribution of one or more plant species. These sequences fell into 14 clades, 6 of which are related to bacteria that are known to form symbioses with plants in other systems. Abundant plant species were more likely to have significant as well as stronger correlations with bacteria and these patterns were more prevalent in lower altitude sites. Conversely, correlations between plant species abundances and bacterial relative abundances were less frequent in sites near the snowline. Thus, plant-bacteria associations became more common as environmental conditions became less harsh and plants became more abundant. This pattern in cooccurrence strength and frequency across the subnival landscape suggests that plant-bacteria interactions are important for the success of life, both below- and above-ground, in an extreme environment.

  1. Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-01

    The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)

  2. Sandia National Laboratories/New Mexico Environmental Baseline update--Revision 1.0

    International Nuclear Information System (INIS)

    1996-07-01

    This report provides a baseline update to provide the background information necessary for personnel to prepare clear and consise NEPA documentation. The environment of the Sandia National Laboratories is described in this document, including the ecology, meteorology, climatology, seismology, emissions, cultural resources and land use, visual resources, noise pollution, transportation, and socioeconomics

  3. Sandia National Laboratories/New Mexico Environmental Baseline update--Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This report provides a baseline update to provide the background information necessary for personnel to prepare clear and consise NEPA documentation. The environment of the Sandia National Laboratories is described in this document, including the ecology, meteorology, climatology, seismology, emissions, cultural resources and land use, visual resources, noise pollution, transportation, and socioeconomics.

  4. Implementation of requirements of environmental management (ISO 14000) for the decommissioning of the heavy water plant

    International Nuclear Information System (INIS)

    Gonzalez, Maria I.; Otero de Eppenstein, Marta; Tosi, Lidia E.; Sabio, Manuel

    2000-01-01

    The National Atomic Energy Commission (CNEA) of Argentina has a project of decommissioning in the heavy water plant (Planta Experimental de Agua Pesada - PEAP). The aim of this project is to get some experience for decommissioning of nuclear plants and to achieve knowledge about the application of the requirements in environmental management. The project is being carried out according to ISO 14001 standards 'Environmental Management Systems'. The objectives were taken from the model without any expectation of achieving the complete implementation or certification of the system. This report is a description of the acts that have been done. (author)

  5. Middlesex Sampling Plant annual environmental report for calendar year 1991, Middlesex, New Jersey

    International Nuclear Information System (INIS)

    1992-09-01

    This document describes the environmental monitoring program at the-Middlesex Sampling Plant (MSP) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MSP began in 1980 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MSP includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, thorium-232, and total uranium concentrations in surface water, sediment,, and groundwater. Additionally, several nonradiological parameters are measured in groundwater, surface water, and sediment. Results of environmental monitoring during 1991 indicate that most concentrations were well below applicable guidelines. The potential radiation dose calculated for a hypothetical maximally exposed individual, based on a conservative but realistic exposure scenario, is 2.3 mrem (milliroentgen equivalent man) per year, which is less than an individual would receive while traveling in an airplane at 12,000 meters for five hours. During 1991, there were no nonroutine releases from the site; MSP was in compliance with applicable regulations for releases from the site. Site activities included environmental monitoring, site maintenance, onsite characterization for the MSP remedial investigation, and additional sediment sampling at the plant outfall to determine the source of the elevated levels of radium-226 and thorium-232

  6. Methodology for predictive modeling of environmental transport and health effects for waste sites at the Savannah River Plant: Environmental information document

    International Nuclear Information System (INIS)

    Stephensen, D.E.; King, C.M.; Looney, B.B.; Grant, M.W.

    1987-03-01

    This document provides information on the methods used to predict chemical transport and the associated health risk for various postulated closure activities at waste sites. The document was prepared as background documentation for the Department of Energy's proposed Environmental Impact Statement (EIS) on waste management activities for groundwater protection at the Savannah River Plant (SRP). The various mathematical formulations used in the environmental transport analysis, the exposure assessment, and the health risk assessment used in the analysis of all foreseeable scenarios as defined by the National Environmental Policy Act (CFR, 1986) are presented in this document. The scenarios do not necessarily represent actual environmental conditions for every SRP waste site. This document was prepared in support of the National Environmental Policy Act process, but does not by itself satisfy federal or state regulatory requirements. 29 refs., 11 figs

  7. Environmental and economic analyses of waste disposal options for traditional markets in Indonesia

    International Nuclear Information System (INIS)

    Aye, Lu; Widjaya, E.R.

    2006-01-01

    Waste from traditional markets in Indonesia is the second largest stream of municipal solid waste after household waste. It has a higher organic fraction and may have greater potential to be managed on a business scale compared to household wastes. The attributed reason is that in general the wastes generated from traditional markets are more uniform, more concentrated and less hazardous than waste from other sources. This paper presents the results of environmental and economic assessments to compare the options available for traditional market waste disposal in Indonesia. The options compared were composting in labour intensive plants, composting in a centralised plant that utilised a simple wheel loader, centralised biogas production and landfill for electricity production. The current open dumping practice was included as the baseline case. A life cycle assessment (LCA) was used for environmental analysis. All options compared have lower environmental impacts than the current practice of open dumping. The biogas production option has the lowest environmental impacts. A cost-benefit analysis, which considered greenhouse gas savings, was used for the economic assessment. It was found that composting at a centralised plant is the most economically feasible option under the present Indonesian conditions. The approach reported in this study could be applied for 'a pre-feasibility first cut comparison' that includes environmental aspects in a decision-making framework for developing countries even though European emission factors were used

  8. Environmental procedures for thermoelectric power plants by national mineral coal; Diretrizes ambientais para usinas termeletricas a carvao mineral nacional

    Energy Technology Data Exchange (ETDEWEB)

    Serra, M T.F.; Verney Gothe, C.A. de; Silva Ramos, R da

    1990-01-01

    This paper presents the environmental impacts decursive of utilization of South-Brazilian mineral coal to generation of electric energy. This environmental impacts and alternatives of attenuating measures are presented and evaluated, containing the totality of productive cycle: mining, processing, transport, stock piling and use in thermoelectric power plants. Environmental procedures are systematized for first time, in order to be observed in whole expansion of coal thermoelectric generator park. The conception of power plants and site studies of their useful lives are also included. (C.M.). 19 figs, 24 tabs.

  9. Modeling of integrated environmental control systems for coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Rubin, E.S.; Salmento, J.S.; Frey, H.C.; Abu-Baker, A.; Berkenpas, M.

    1991-05-01

    The Integrated Environmental Control Model (IECM) was designed to permit the systematic evaluation of environmental control options for pulverized coal-fired (PC) power plants. Of special interest was the ability to compare the performance and cost of advanced pollution control systems to conventional'' technologies for the control of particulate, SO{sub 2} and NO{sub x}. Of importance also was the ability to consider pre-combustion, combustion and post-combustion control methods employed alone or in combination to meet tough air pollution emission standards. Finally, the ability to conduct probabilistic analyses is a unique capability of the IECM. Key results are characterized as distribution functions rather than as single deterministic values. (VC)

  10. The Functional Resonance Analysis Method for a systemic risk based environmental auditing in a sinter plant: A semi-quantitative approach

    International Nuclear Information System (INIS)

    Patriarca, Riccardo; Di Gravio, Giulio; Costantino, Francesco; Tronci, Massimo

    2017-01-01

    Environmental auditing is a main issue for any production plant and assessing environmental performance is crucial to identify risks factors. The complexity of current plants arises from interactions among technological, human and organizational system components, which are often transient and not easily detectable. The auditing thus requires a systemic perspective, rather than focusing on individual behaviors, as emerged in recent research in the safety domain for socio-technical systems. We explore the significance of modeling the interactions of system components in everyday work, by the application of a recent systemic method, i.e. the Functional Resonance Analysis Method (FRAM), in order to define dynamically the system structure. We present also an innovative evolution of traditional FRAM following a semi-quantitative approach based on Monte Carlo simulation. This paper represents the first contribution related to the application of FRAM in the environmental context, moreover considering a consistent evolution based on Monte Carlo simulation. The case study of an environmental risk auditing in a sinter plant validates the research, showing the benefits in terms of identifying potential critical activities, related mitigating actions and comprehensive environmental monitoring indicators. - Highlights: • We discuss the relevance of a systemic risk based environmental audit. • We present FRAM to represent functional interactions of the system. • We develop a semi-quantitative FRAM framework to assess environmental risks. • We apply the semi-quantitative FRAM framework to build a model for a sinter plant.

  11. The Functional Resonance Analysis Method for a systemic risk based environmental auditing in a sinter plant: A semi-quantitative approach

    Energy Technology Data Exchange (ETDEWEB)

    Patriarca, Riccardo, E-mail: riccardo.patriarca@uniroma1.it; Di Gravio, Giulio; Costantino, Francesco; Tronci, Massimo

    2017-03-15

    Environmental auditing is a main issue for any production plant and assessing environmental performance is crucial to identify risks factors. The complexity of current plants arises from interactions among technological, human and organizational system components, which are often transient and not easily detectable. The auditing thus requires a systemic perspective, rather than focusing on individual behaviors, as emerged in recent research in the safety domain for socio-technical systems. We explore the significance of modeling the interactions of system components in everyday work, by the application of a recent systemic method, i.e. the Functional Resonance Analysis Method (FRAM), in order to define dynamically the system structure. We present also an innovative evolution of traditional FRAM following a semi-quantitative approach based on Monte Carlo simulation. This paper represents the first contribution related to the application of FRAM in the environmental context, moreover considering a consistent evolution based on Monte Carlo simulation. The case study of an environmental risk auditing in a sinter plant validates the research, showing the benefits in terms of identifying potential critical activities, related mitigating actions and comprehensive environmental monitoring indicators. - Highlights: • We discuss the relevance of a systemic risk based environmental audit. • We present FRAM to represent functional interactions of the system. • We develop a semi-quantitative FRAM framework to assess environmental risks. • We apply the semi-quantitative FRAM framework to build a model for a sinter plant.

  12. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    International Nuclear Information System (INIS)

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP's environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence

  13. Evaluation of the environmental sustainability of different waste-to-energy plant configurations.

    Science.gov (United States)

    Lombardi, Lidia; Carnevale, Ennio A

    2018-03-01

    Residual municipal solid waste (MSW) has an average lower heating value higher than 10GJ/Mg in the EU, and can be recovered in modern Waste-to-Energy (WtE) plants, producing combined heat and power (CHP) and reaching high levels of energy recovery. CHP is pinpointed as the best technique for energy recovery from waste. However, in some cases, heat recovery is not technically feasible - due to the absence of a thermal user (industrial plant or district heating) in the vicinity of the WtE plant - and power production remains the sole possibility. In these cases, there are some challenges involved in increasing the energy performance as much as possible. High energy recovery efficiency values are very important for the environmental sustainability of WtE plants. The more electricity and heat is produced, the better the saving of natural resources that can be achieved. Within this frame, the aim of this work is to carry out an environmental assessment, through Life Cycle Assessment, of an MSW WtE plant, considering different sizes and operated in different ways, from power production only to full cogeneration. The main assumption is that the electric conversion efficiency increases as the plant size increases, introducing technical improvements thanks to the economies of scale. Impact assessment results were calculated using ReCiPe 2008 methods. The climate change indicator is positive when the WtE plant is operated in power production only mode, with values decreasing for the increasing size. Values for the climate change are negative when cogeneration is applied, requiring increasing cogeneration ratios for decreasing size. Similarly, the fossil fuel depletion indicator benefits from increase of both the plant size and the cogeneration rate, but it is always negative, meaning that the residual MSW burning with energy recovery always provides a saving of fossil primary energy. Other indicator values are in general negative and are also beneficially affected by

  14. Synthesis and Comparison of Baseline Avian and Bat Use, Raptor Nesting and Mortality Information from Proposed and Existing Wind Developments: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, Wallace P.

    2002-12-01

    Primarily due to concerns generated from observed raptor mortality at the Altamont Pass (CA) wind plant, one of the first commercial electricity generating wind plants in the U.S., new proposed wind projects both within and outside of California have received a great deal of scrutiny and environmental review. A large amount of baseline and operational monitoring data have been collected at proposed and existing U.S. wind plants. The primary use of the avian baseline data collected at wind developments has been to estimate the overall project impacts (e.g., very low, low, moderate, and high relative mortality) on birds, especially raptors and sensitive species (e.g., state and federally listed species). In a few cases, these data have also been used for guiding placement of turbines within a project boundary. This new information has strengthened our ability to accurately predict and mitigate impacts from new projects. This report should assist various stakeholders in the interpretation and use of this large information source in evaluating new projects. This report also suggests that the level of baseline data (e.g., avian use data) required to adequately assess expected impacts of some projects may be reduced. This report provides an evaluation of the ability to predict direct impacts on avian resources (primarily raptors and waterfowl/waterbirds) using less than an entire year of baseline avian use data (one season, two seasons, etc.). This evaluation is important because pre-construction wildlife surveys can be one of the most time-consuming aspects of permitting wind power projects. For baseline data, this study focuses primarily on standardized avian use data usually collected using point count survey methodology and raptor nest survey data. In addition to avian use and raptor nest survey data, other baseline data is usually collected at a proposed project to further quantify potential impacts. These surveys often include vegetation mapping and state or

  15. Modelling the effect of environmental factors on resource allocation in mixed plants systems

    Science.gov (United States)

    Gayler, Sebastian; Priesack, Eckart

    2010-05-01

    In most cases, growth of plants is determined by competition against neighbours for the local resources light, water and nutrients and by defending against herbivores and pathogens. Consequently, it is important for a plant to grow fast without neglecting defence. However, plant internal substrates and energy required to support maintenance, growth and defence are limited and the total demand for these processes cannot be met in most cases. Therefore, allocation of carbohydrates to growth related primary metabolism or to defence related secondary metabolism can be seen as a trade-off between the demand of plants for being competitive against neighbours and for being more resistant against pathogens. A modelling approach is presented which can be used to simulate competition for light, water and nutrients between plant individuals in mixed canopies. The balance of resource allocation between growth processes and synthesis of secondary compounds is modelled by a concept originating from different plant defence hypothesis. The model is used to analyse the impact of environmental factors such as soil water and nitrogen availability, planting density and atmospheric concentration of CO2 on growth of plant individuals within mixed canopies and variations in concentration of carbon-based secondary metabolites in plant tissues.

  16. BIOGAS PLANT AS AN ELEMENT THAT HAS A POSITIVE INFLUENCE ON THE ENVIRONMENTAL CHANGES OF RURAL SPACE

    Directory of Open Access Journals (Sweden)

    Wojciech Pawłowski

    2017-10-01

    Full Text Available In the contemporary rural landscape, an agricultural biogas plant is becoming an increasingly frequent element of agricultural installations. There is a need to ask an important question: is a new technology, such as biogas plants with medium power of 1MW, listed as investments which can have significant environmental impacts? This question is becoming an integral part of rural space as a new form of village buildings. The inevitable changes in the rural landscape and the way of carrying out farming have both a positive and negative impact on the rural environment. Biogas plants, as new objects in developing country industries, are undoubtedly an important element in the way of obtaining green energy. Location is the most important factor for the success of the establishment and operation of the biogas plant, which is important not only for economic reasons, but also socio-environmental and landscape reasons.

  17. Impact of environmental cost on economics of thermal power plant. Paper no. IGEC-1-007

    International Nuclear Information System (INIS)

    Chandra, H.; Kaushik, S.C.; Chandra, A.

    2005-01-01

    Cost analysis per unit of power generation have been performed for coal based thermal power plant situated in Dadri (UP) for Indian and imported coal from Australia and America. In our study it has been found that it is better to use imported coal in Indian thermal power plants with advantages like low environmental, investment and total cost per unit of power generation. The effect of percent excess air and plant load factor on total cost per unit of power generation is also analyzed. (author)

  18. A study on the implementation of an integrated Environmental Qualification Management System(EQMS) for nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Bhang, Keug Jin; Jeong, Sun Chul; Kang, Pil Sun [KHNP CRI, Daejeon (Korea, Republic of)

    2012-10-15

    Environmental Qualification Management System(EQMS) for Nuclear Power Plant is a web based program for preventing degradation and managing original functions of environmental qualification equipment during nuclear power plant life cycle by inspecting and improving status of them periodically. But cognitive issues have stayed in the construction phase of EQMS: almost EQ equipment are not registered in DREAMS because the approach is not based on a standard data structure. In this study, we are to obtain the requirements of integrated EQMS by considering a standard and surveying the problems of current EQMS.

  19. A study on the implementation of an integrated Environmental Qualification Management System(EQMS) for nuclear power plant

    International Nuclear Information System (INIS)

    Bhang, Keug Jin; Jeong, Sun Chul; Kang, Pil Sun

    2012-01-01

    Environmental Qualification Management System(EQMS) for Nuclear Power Plant is a web based program for preventing degradation and managing original functions of environmental qualification equipment during nuclear power plant life cycle by inspecting and improving status of them periodically. But cognitive issues have stayed in the construction phase of EQMS: almost EQ equipment are not registered in DREAMS because the approach is not based on a standard data structure. In this study, we are to obtain the requirements of integrated EQMS by considering a standard and surveying the problems of current EQMS

  20. EPA R1 RCRA Corrective Action 2020 Baseline Site Property Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — Property boundaries as indicated in figures of all facilities subject to RCRA Corrective Action on the 2020 baseline in Region 1. For more information on the RCRA...

  1. A preliminary investigation of the environmental impact of a thermal power plant in relation to PCB contamination.

    Science.gov (United States)

    Gedik, Kadir; Imamoglu, Ipek

    2011-07-01

    The most significant application of polychlorinated biphenyls (PCBs) is in transformers and capacitors. Therefore, power plants are important suspected sources for entry of PCBs into the environment. In this context, the levels and distribution of PCBs in sediment, soil, ash, and sludge samples were investigated around Seyitömer thermal power plant, Kütahya, Turkey. Moreover, identity and contribution of PCB mixtures were predicted using the chemical mass balance (CMB) receptor model. United States Environmental Protection Agency methods were applied during sample preparation, extraction (3540C), cleanup (3660B, 3665A, 3630C), and analysis (8082A). ΣPCB concentrations in the region ranged from not detected to 385 ng/g dry weight, with relatively higher contamination in sediments in comparison to soil, sludge, and ash samples collected from around the power plant. Congener profiles of the sediment and soil samples show penta-, hexa-, and hepta-chlorobiphenyls as the major homolog groups. The results from the CMB model indicate that PCB contamination is largely due to Clophen A60/A40 and Aroclor 1254/1254(late)/1260 release into the sediment and sludge samples around the thermal power plant. Since there are no other sources of PCBs in the region and the identity of PCB sources estimated by the CMB model mirrors PCB mixtures contained in transformers formerly used in the plant, the environmental contamination observed especially in sediments is attributed to the power plant. Release of PCBs over time, as indicated by the significant concentrations observed even in surface samples, emphasizes the importance of the need for better environmental management.

  2. Coevolving MAPK and PID phosphosites indicate an ancient environmental control of PIN auxin transporters in land plants.

    Science.gov (United States)

    Dory, Magdalena; Hatzimasoura, Elizabeth; Kállai, Brigitta M; Nagy, Szilvia K; Jäger, Katalin; Darula, Zsuzsanna; Nádai, Tímea V; Mészáros, Tamás; López-Juez, Enrique; Barnabás, Beáta; Palme, Klaus; Bögre, László; Ditengou, Franck A; Dóczi, Róbert

    2018-01-01

    Plant growth flexibly adapts to environmental conditions, implying cross-talk between environmental signalling and developmental regulation. Here, we show that the PIN auxin efflux carrier family possesses three highly conserved putative mitogen-activated protein kinase (MAPK) sites adjacent to the phosphorylation sites of the well-characterised AGC kinase PINOID, which regulates the polar localisation of PINs and directional auxin transport, thereby underpinning organ growth. The conserved sites of PIN1 are phosphorylated in vitro by two environmentally activated MAPKs, MPK4 and MPK6. In contrast to AGC kinases, MAPK-mediated phosphorylation of PIN1 at adjacent sites leads to a partial loss of the plasma membrane localisation of PIN1. MAPK-mediated modulation of PIN trafficking may participate in environmental adjustment of plant growth. © 2017 The Authors. FEBS Letters published by John Wiley & Sons Ltd on behalf of Federation of European Biochemical Societies.

  3. Identification of environmental issues: Hybrid wood-geothermal power plant, Wendel-Amedee KGRA, Lassen County, California: First phase report

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-14

    The development of a 55 MWe power plant in Lassen County, California, has been proposed. The proposed power plant is unique in that it will utilize goethermal heat and wood fuel to generate electrical power. This report identifies environmental issues and constraints which may impact the proposed hybrid wood-geothermal power plant. (ACR)

  4. Environmental monitoring and cooperative resource management at the WIPP site

    International Nuclear Information System (INIS)

    1992-01-01

    This poster session by the Environmental Monitoring Section of the US DOE Waste Isolation Pilot Plant is to demonstrate that the DOE is committed to sound environmental management. This WIPP poster session demonstrates radiological as well as nonradiological environmental monitoring activities conducted routinely at the WIPP. And how data collected prior to the WIPP being operational is used to establish a preoperational baseline for environmental studies in which the samples collected during the operational phase will be compared. Cooperative Resource Management is a relatively new concept for governments agencies. It allows two or more agencies the ability to jointly share in funding a program or project and yet both agencies can benefit from the outcome. These programs are usually a biological type study. The WIPP cooperative agreement between the US BLM, DOE and its contractors is to continue the ongoing documentation of the diversity of the Chihuahuan desert

  5. Waste Isolation Pilot Plant Annual Site Environmental Report for 2016

    Energy Technology Data Exchange (ETDEWEB)

    Ward, Anderson [Carlsbad Field Office (CBFO), NM (United States); Basabilvazo, George T. [Carlsbad Field Office (CBFO), NM (United States)

    2017-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2016 (ASER) is to provide the information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC) maintain and preserve the environmental resources at the WIPP facility. DOE Order 231.1B; DOE Order 436.1, Departmental Sustainability; and DOE Order 458.1, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1B, which requires DOE facilities to submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer.

  6. Fatigue evaluation including environmental effects for primary circuit components in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Seichter, Johannes [Siempelkamp Pruef- und Gutachter-Gesellschaft mbH, Dresden (Germany); Reese, Sven H.; Klucke, Dietmar [E.ON Kernkraft GmbH, Hannover (Germany). Component Technology

    2013-06-01

    The influence of LWR coolant environment to the lifetime of materials in nuclear power plants is being discussed internationally. Environmental phenomena had been investigated in laboratory tests and published in recent years. The discussion is mainly focused both on the transition from laboratory to real plant components and on numerical calculation procedures. Since publishing of the NUREG/CR-6909 report in 2007, formulae for calculating the Fen factors have been modified several times. Various calculation procedures are discussed and recommendations are made how to avoid extremely conservative results. (orig.)

  7. Final environmental impact statement. Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text

  8. Final environmental impact statement. Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

  9. Stress Response to High Magnetic Fields in Transgenic Arabidopsis thaliana Plants.

    Science.gov (United States)

    Morgan, A. N.; Watson, B. C.; Maloney, J. R.; Meisel, M. W.; Brooks, J. S.; Paul, A.-L.; Ferl, R. J.

    2000-03-01

    With increasingly greater strength magnetic fields becoming available in research and medicine, the response of living tissue exposed to high magnetic fields has come under investigation. In this experiment, genetically engineered arabidopsis plants were exposed to homogeneous magnetic fields of varying strengths using a superconducting NMR magnet (0 to 9 T) at UF and a resistive magnet (0 to 25 T) at the NHMFL. The engineered plants produce the enzyme β-glucaronidase (GUS) when under stressful environmental conditions. The level of GUS activity is determined through qualitative histochemical assays and quantitative fluorometric assays. The control group of plants experienced baseline levels of GUS activity, but some of the plants that were exposed to magnetic fields in excess of 9 T show increased stress response. Additional information is available at http://www.phys.ufl.edu/ ~meisel/maglev.htm.

  10. Baseline development, economic risk, and schedule risk: An integrated approach

    International Nuclear Information System (INIS)

    Tonkinson, J.A.

    1994-01-01

    The economic and schedule risks of Environmental Restoration (ER) projects are commonly analyzed toward the end of the baseline development process. Risk analysis is usually performed as the final element of the scheduling or estimating processes for the purpose of establishing cost and schedule contingency. However, there is an opportunity for earlier assessment of risks, during development of the technical scope and Work Breakdown Structure (WBS). Integrating the processes of risk management and baselining provides for early incorporation of feedback regarding schedule and cost risk into the proposed scope of work. Much of the information necessary to perform risk analysis becomes available during development of the technical baseline, as the scope of work and WBS are being defined. The analysis of risk can actually be initiated early on during development of the technical baseline and continue throughout development of the complete project baseline. Indeed, best business practices suggest that information crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable

  11. The role of environmental survey laboratory at Nuclear Power Plants sites in India in environmental awareness and education programmes

    International Nuclear Information System (INIS)

    Hegde, A.G.; Singhal, R.K.; Sharma, R.M.

    2004-01-01

    Increased public awareness of nuclear power runs the gamut from immediate disengagement to whole-hearted approval of the use of and expansion of this energy source. The involved study carried out at different Environmental Survey Laboratories (ESL) is mainly responsible for the environment friendly attitudes of the large section of public. The scientists working in these laboratories collected vast data on different environmental issues related to releases of very low levels of radioactivity in the environment. The total dose received by a hypothetical individual member of public (critical group) evaluated at plant boundary i.e. 1.6 km zone is generally in the range of 2-50 mSv/y which is about two order of magnitude less compared to limits prescribed by the Atomic Energy Regulatory Board (AERB) and International Commission on Radiological Protection ICRP) suggested value of 1 mSv/y. The ESL staff give special attention to communicate to the public to clear their queries and dislodge, their misconception about the nuclear facilities operating at their site. At ESL, various environmental pathways responsible for radiation dose and their impact on different environmental matrices are nicely presented in the form of charts and posters. Site and off-site emergency exercise are conducted regularly in co-ordination with inter governmental agencies responsible for mass sheltering, medical facilities and transportation. During these exercises mass communication programme are conducted to educate the public in the vicinity of Nuclear Power Plants Sites. ESL also updates from time to time the population distribution data within 30 km radial zone and the dietary habit of the population within this zone. (author)

  12. 75 FR 77919 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental...

    Science.gov (United States)

    2010-12-14

    ... affect radiation exposures to plant workers and members of the public. Therefore, no changes or different... socioeconomic resources. Therefore, no changes to or different types of non-radiological environmental impacts...

  13. 75 FR 14638 - FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...

    Science.gov (United States)

    2010-03-26

    ... effluents that effect radiation exposures to plant workers and members of the public. Therefore, no changes... socioeconomic resources. Therefore, no changes to or different types of non-radiological environmental impacts...

  14. Environmental monitoring around nuclear power plants of EDF in France

    International Nuclear Information System (INIS)

    Chretien, V.; Hemidy, P.Y.

    2010-01-01

    As part of the regulatory environmental monitoring around its nuclear power plants, EDF carries out every year more than 40.000 measurements. In addition EDF performs more precise radioecological surveys on all its sites. This monitoring shows the minor incidence of EDF's nuclear power plants on the environment and a general decrease of gamma emitters radionuclides in the environment. These results confirm the efforts lead by EDF to minimise its impacts on the environment, linked to an efficient waste management and demonstrate the good operating standards of its plants. On a qualitative viewpoint, significant efforts on both metrology and organization have lead to improved measurements capabilities, in order to achieve NF EN ISO/CEI 17025 standard compliance. More recently, a similar approach has been implemented with sampling methods. While today the level achieved in the number and quality of measurement complies with the objectives of the monitoring of the impact of the nuclear power plants on the environment, the results of this monitoring should be presented to the public with more pedagogy to give an adequate answer to their expectations. The new questions that will undoubtedly be raised by the recent availability of this information on the Internet should reinforce this dialogue and should also be the opportunity to improve the quality of our communication. (author)

  15. Shadow prices of emerging pollutants in wastewater treatment plants: Quantification of environmental externalities.

    Science.gov (United States)

    Bellver-Domingo, A; Fuentes, R; Hernández-Sancho, F

    2017-12-01

    Conventional wastewater treatment plants (WWTPs) are designed to remove mainly the organic matter, nitrogen and phosphorus compounds and suspended solids from wastewater but are not capable of removing chemicals of human origin, such as pharmaceutical and personal care products (PPCPs). The presence of PPCPs in wastewater has environmental effects on the water bodies receiving the WWTP effluents and renders the effluent as unsuitable as a nonconventional water source. Considering PPCPs as non-desirable outputs, the shadow prices methodology has been implemented using the output distance function to measure the environmental benefits of removing five PPCPs (acetaminophen, ibuprofen, naproxen, carbamazepine and trimethoprim) from WWTP effluents discharged to three different ecosystems (wetland, river and sea). Acetaminophen and ibuprofen show the highest shadow prices of the sample for wetland areas. Their values are 128.2 and 11.0 €/mg respectively. These results represent a proxy in monetary terms of the environmental benefit achieved from avoiding the discharge of these PPCPs in wetlands. These results suggest which PPCPs are urgent to remove from wastewater and which ecosystems are most vulnerable to their presence. The findings of this study will be useful for the plant managers in order to make decisions about prioritization in the removal of different pollutants. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Survey and analysis on environmental and electromagnetic effect on instrumentation and control equipment of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, In Koo; Lee, Dong Young; Cha, Kyung Ho

    2001-03-01

    As the instrumentation and control (I and C) equipment suppliers tend to provide digital components rather than conventional analog type components for instrumentation and control systems of nuclear power plants(NPPs), it is unavoidable to adopt digital equipment for safety I and C systems as well as non-safety systems. However, the full introduction of digital equipment for I and C systems of nuclear power plants raises several concerns which have not been considered in conventional analog I and C equipment. The two major examples of the issues of digital systems are environmental/electromagnetic compatibility (EMC) and software reliability. This report presents the survey and research results on environmental and electromagnetic effect on I and C equipment of nuclear power plants to give a guideline for aging management and design process. Electromagnetic site surveys were conducted to be used as a part of technical basis to demonstrate that I and C systems are compatible with the ambient electromagnetic noise in Korean nuclear power plants.

  17. Health and environmental impacts of a fertilizer plant - Part I: Assessment of radioactive pollution

    Energy Technology Data Exchange (ETDEWEB)

    Righi, Serena [Interdepartment Centre for Research in Environmental Science, University of Bologna, via dell' Agricoltura 5, 48100 Ravenna (Italy)]. E-mail: serena.righi2@unibo.it; Lucialli, Patrizia [ARPA, Emilia-Romagna Regional Agency for Prevention and Environment, Department of Ravenna, via Alberoni 17/19, 48100 Ravenna (Italy); Bruzzi, Luigi [Interdepartment Centre for Research in Environmental Science, University of Bologna, via dell' Agricoltura 5, 48100 Ravenna (Italy)

    2005-07-01

    The aim of the first part of this investigation is to assess the radioactive pollution caused by a production plant of complex fertilizers (that is to say containing nitrogen, phosphorus and, in some cases, potassium). Firstly, the authors determine the concentrations of natural radioactivity present in raw materials, end products and wastes of the industrial plant. Then, they carry out an assessment of radioactive releases into the atmosphere, hydrosphere and lithosphere as well as of their significance from the environmental point of view. The second part of the investigation will be aimed at assessing the annual effective doses to plant workers and to members of the population surrounding the industrial site.

  18. Health and environmental impacts of a fertilizer plant - Part I: Assessment of radioactive pollution

    International Nuclear Information System (INIS)

    Righi, Serena; Lucialli, Patrizia; Bruzzi, Luigi

    2005-01-01

    The aim of the first part of this investigation is to assess the radioactive pollution caused by a production plant of complex fertilizers (that is to say containing nitrogen, phosphorus and, in some cases, potassium). Firstly, the authors determine the concentrations of natural radioactivity present in raw materials, end products and wastes of the industrial plant. Then, they carry out an assessment of radioactive releases into the atmosphere, hydrosphere and lithosphere as well as of their significance from the environmental point of view. The second part of the investigation will be aimed at assessing the annual effective doses to plant workers and to members of the population surrounding the industrial site

  19. Exergy, exergoeconomic and environmental analyses and evolutionary algorithm based multi-objective optimization of combined cycle power plants

    International Nuclear Information System (INIS)

    Ahmadi, Pouria; Dincer, Ibrahim; Rosen, Marc A.

    2011-01-01

    A comprehensive exergy, exergoeconomic and environmental impact analysis and optimization is reported of several combined cycle power plants (CCPPs). In the first part, thermodynamic analyses based on energy and exergy of the CCPPs are performed, and the effect of supplementary firing on the natural gas-fired CCPP is investigated. The latter step includes the effect of supplementary firing on the performance of bottoming cycle and CO 2 emissions, and utilizes the first and second laws of thermodynamics. In the second part, a multi-objective optimization is performed to determine the 'best' design parameters, accounting for exergetic, economic and environmental factors. The optimization considers three objective functions: CCPP exergy efficiency, total cost rate of the system products and CO 2 emissions of the overall plant. The environmental impact in terms of CO 2 emissions is integrated with the exergoeconomic objective function as a new objective function. The results of both exergy and exergoeconomic analyses show that the largest exergy destructions occur in the CCPP combustion chamber, and that increasing the gas turbine inlet temperature decreases the CCPP cost of exergy destruction. The optimization results demonstrates that CO 2 emissions are reduced by selecting the best components and using a low fuel injection rate into the combustion chamber. -- Highlights: → Comprehensive thermodynamic modeling of a combined cycle power plant. → Exergy, economic and environmental analyses of the system. → Investigation of the role of multiobjective exergoenvironmental optimization as a tool for more environmentally-benign design.

  20. Plant-Based Lunch at Work: Effects on Nutrient Intake, Environmental Impact and Tastiness—A Case Study

    Directory of Open Access Journals (Sweden)

    Mirjam E. van de Kamp

    2018-01-01

    Full Text Available The aim of this study was to determine the environmental impact, nutrient intake, appreciation and tastiness of three buffet-style lunches served at the workplace, consisting of (1 animal-based foods; (2 plant-based foods; and (3 both animal-based and plant-based foods. Employees of the National Institute for Public Health and the Environment in the Netherlands participated in the study. Participants scored the lunch for appreciation and tastiness (scores from 1 to 10. Greenhouse gas (GHG emissions and land use associated with foods consumed were calculated using life cycle assessments. Nutrient intake was calculated using food composition data. The results show that both the plant-based and the combination lunch received higher scores for tastiness than the animal-based lunch. GHG emissions and land use were lowest for the plant-based lunch and highest for the animal-based lunch. The combination lunch was associated with increased fiber and decreased saturated fat intake compared to the animal-based lunch, but also lead to increased energy intake. The plant-based lunch did not increase energy intake, while increasing fiber intake and decreasing sodium (salt and saturated fat intakes. These initial results show that plant-based lunches have the potential to improve nutrient intake and tastiness while reducing environmental impact. Additional research in this field is worthwhile.

  1. Environmental monitoring for tritium in tritium separation facility

    International Nuclear Information System (INIS)

    Varlam, Carmen; Stefanescu, Ioan; Steflea, Dumitru; Lazar, Roxana Elena

    2001-01-01

    The Cryogenic Pilot is an experimental project in the nuclear energy national research program, which has the aim of developing technologies for tritium and deuterium separation by cryogenic distillation. The experimental installation is located 15 km near the highest city of the area and 1 km near Olt River. An important chemical activity is developed in the area and chemical plants make up almost entire neighborhood of the Experimental Cryogenic Pilot. It is necessary to emphasize this aspect because the hall sewage system of the pilot is connected with the one of other three chemical plants from vicinity. This is the reason why we progressively established elements of an environmental monitoring program well in advance of tritium operation in order to determine baseline levels. The first step was the tritium level monitoring in environmental water and sewage from neighboring industrial activity. In this work, a low background liquid scintillation was used to determine tritium activity concentration according to ISO 9698/1998 standard. We measured drinking water, precipitation, river water, underground water and wastewater. The tritium level was between 10 TU and 27 TU what indicates that there is no source of tritium contamination in the neighborhood of Cryogenic Pilot. In order to determine baseline levels we decided to monitor monthly each location. In this paper it is presented a standard method used for tritium determination in water samples, the precautions needed to achieve reliable results and the evolution of tritium level in different location near the Experimental Pilot for Tritium and Deuterium Cryogenic Separation. (authors)

  2. Environmental monitoring for tritium at tritium separation facility

    International Nuclear Information System (INIS)

    Varlam, C.; Stefanescu, I.; Steflea, D.; Lazar, R.E.

    2001-01-01

    The Cryogenic Pilot is an experimental project in the nuclear energy national research program, which has the aim of developing technologies for tritium and deuterium separation by cryogenic distillation. The experimental installation is located 15 km near the highest city of the area and 1 km near Olt River. An important chemical activity is developed in the area and the Experimental Cryogenic Pilot's, almost the entire neighborhood are chemical plants. It is necessary to emphasize this aspect because the sewerage system is connected with the other three chemical plants from the neighborhood. This is the reason that we progressively established elements of an environmental monitoring program well in advance of tritium operation in order to determine baseline levels. The first step was the tritium level monitoring in environmental water and waste water of industrial activity from neighborhood. In this work, a low background liquid scintillation is used to determine tritium activity concentration according to ISO 9698/1998. We measured drinking water, precipitation, river water, underground water and waste water. The tritium level was between 10 TU and 27 TU that indicates there is no source of tritium contamination in the neighborhood of Cryogenic Pilot. In order to determine baseline levels we decide to monitories monthly each location. In this paper a standard method is presented which it is used for tritium determination in water sample, the precautions needed in order to achieve reliable results, and the evolution of tritium level in different location near the Experimental Pilot Tritium and Deuterium Cryogenic Separation.(author)

  3. Environmental regulations and plant exit: A logit analysis based on established panel data

    Energy Technology Data Exchange (ETDEWEB)

    Bioern, E; Golombek, R; Raknerud, A

    1995-12-01

    This publication uses a model to study the relationship between environmental regulations and plant exit. It has the main characteristics of a multinomial qualitative response model of the logit type, but also has elements of a Markov chain model. The model uses Norwegian panel data for establishments in three manufacturing sectors with high shares of units which have been under strict environmental regulations. In two of the sectors, the exit probability of non-regulated establishments is about three times higher than for regulated ones. It is also found that the probability of changing regulation status from non-regulated to regulated depends significantly on economic factors. In particular, establishments with weak profitability are the most likely to become subject to environmental regulation. 12 refs., 2 figs., 6 tabs.

  4. Pantex Plant site environmental report for calendar year 1989

    International Nuclear Information System (INIS)

    1990-05-01

    This report summarizes the environmental monitoring program at Pantex Plant for 1989. It has been prepared in accordance with the United States Department of Energy Order 5400.1. This report presents monitoring data for both radioactive and nonradioactive species in the local environment. Plant activities involve the handling of significant quantities of uranium, plutonium, and tritium in the form of completed parts received from other DOE facilities, resulting in a very low potential for release of these radionuclides to the atmosphere. In May 1989, there was an accidental release of 40,000 curies (Ci) of tritium (conservatively estimated). The normal releases during the year were 0.12 Ci of tritium and 21 μCi of uranium-238. The USEPA issued a draft Administrative Order of Consent under section 3008(h) in 1988. Negotiations between DOE and EPA are still continuing. Chromium at a level above drinking water standards was found in a perched groundwater well in zone 12. Also, trace amounts of solvents and high explosives were found in the perched groundwater in zone 12. 12 refs., 10 figs., 53 tabs

  5. Pantex Plant site environmental report for calendar year 1989

    Energy Technology Data Exchange (ETDEWEB)

    1990-05-01

    This report summarizes the environmental monitoring program at Pantex Plant for 1989. It has been prepared in accordance with the United States Department of Energy Order 5400.1. This report presents monitoring data for both radioactive and nonradioactive species in the local environment. Plant activities involve the handling of significant quantities of uranium, plutonium, and tritium in the form of completed parts received from other DOE facilities, resulting in a very low potential for release of these radionuclides to the atmosphere. In May 1989, there was an accidental release of 40,000 curies (Ci) of tritium (conservatively estimated). The normal releases during the year were 0.12 Ci of tritium and 21 {mu}Ci of uranium-238. The USEPA issued a draft Administrative Order of Consent under section 3008(h) in 1988. Negotiations between DOE and EPA are still continuing. Chromium at a level above drinking water standards was found in a perched groundwater well in zone 12. Also, trace amounts of solvents and high explosives were found in the perched groundwater in zone 12. 12 refs., 10 figs., 53 tabs.

  6. Fukushima Daiichi Nuclear Power Plant accident: facts, environmental contamination, possible biological effects, and countermeasures

    OpenAIRE

    Anzai, Kazunori; Ban, Nobuhiko; Ozawa, Toshihiko; Tokonami, Shinji

    2011-01-01

    On March 11, 2011, an earthquake led to major problems at the Fukushima Daiichi Nuclear Power Plant. A 14-m high tsunami triggered by the earthquake disabled all AC power to Units 1, 2, and 3 of the Power Plant, and carried off fuel tanks for emergency diesel generators. Despite many efforts, cooling systems did not work and hydrogen explosions damaged the facilities, releasing a large amount of radioactive material into the environment. In this review, we describe the environmental impact of...

  7. Development & Characterization of a Whole Plant Chamber for the Investigation of Environmental Perturbations on Biogenic VOC Emissions

    Science.gov (United States)

    Holder, J.; Riches, M.; Abeleira, A.; Farmer, D.

    2017-12-01

    Accurate prediction of both climate and air quality under a changing earth system requires a full understanding of the sources, feedbacks, and ultimate fate of all atmospherically relevant chemical species, including volatile organic compounds (VOCs). Biogenic VOCs (BVOC) from plant emissions are the main source of VOCs to the atmosphere. However, the impact of global change on BVOC emissions is poorly understood. For example, while short-term increases in temperature are typically associated with increased BVOC emissions, the impact of long-term temperature increases are less clear. Our study aims to investigate the effects of long-term, singular and combined environmental perturbations on plant BVOC emissions through the use of whole plant chambers in order to better understand the effects of global change on BVOC-climate-air quality feedbacks. To fill this knowledge gap and provide a fundamental understanding of how BVOC emissions respond to environmental perturbations, specifically elevated temperature, CO2, and drought, whole citrus trees were placed in home-built chambers and monitored for monoterpene and other BVOC emissions utilizing thermal desorption gas chromatography mass spectrometry (TD-GC-MS). Designing and building a robust whole plant chamber to study atmospherically relevant chemical species while accommodating the needs of live plants over timescales of days to weeks is not a trivial task. The environmental conditions within the chamber must be carefully controlled and monitored. The inter-plant and chamber variability must be characterized. Finally, target BVOCs need to be sampled and detected from the chamber. Thus, the chamber design, control and characterization considerations along with preliminary BVOC results will be presented and discussed.

  8. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  9. Environmental Problems Associated With Decommissioning The Chernobyl Nuclear Power Plant Cooling Pond

    International Nuclear Information System (INIS)

    Farfan, E. B.; Jannik, G. T.; Marra, J. C.; Oskolkov, B. Ya.; Bondarkov, M. D.; Gaschak, S. P.; Maksymenko, A. M.; Maksymenko, V. M.; Martynenko, V. I.

    2009-01-01

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning

  10. Environmental Problems Associated With Decommissioning The Chernobyl Nuclear Power Plant Cooling Pond

    Energy Technology Data Exchange (ETDEWEB)

    Farfan, E. B.; Jannik, G. T.; Marra, J. C.; Oskolkov, B. Ya.; Bondarkov, M. D.; Gaschak, S. P.; Maksymenko, A. M.; Maksymenko, V. M.; Martynenko, V. I.

    2009-11-09

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.

  11. ENVIRONMENTAL PROBLEMS ASSOCIATED WITH DECOMMISSIONING THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND

    Energy Technology Data Exchange (ETDEWEB)

    Farfan, E.

    2009-09-30

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.

  12. Effect of simultaneously induced environmental stimuli on electrical signalling and gas exchange in maize plants.

    Science.gov (United States)

    Vuralhan-Eckert, Jasmin; Lautner, Silke; Fromm, Jörg

    2018-04-01

    Electrical signalling in response to environmental stimuli is a well-known phenomenon in higher plants. For example, in maize, different stimuli, such as wounding or re-irrigation after drought, incite characteristic electrical signals which have quite particular effects on gas exchange. What is less well understood is how plants (specifically maize) respond when two different environmental stimuli are applied simultaneously. To explore this, a three-stage experiment was designed. In the first stage, drought conditions were simulated by decreasing the soil water content to 30-40 % of field capacity. In these conditions, and in contrast to well-watered plants, the maize exhibited only 60-70% of the original level of stomatal conductance and 50-60 % of the original photosynthesis rate. In the second stage of the experiment the plants were re-irrigated and heat stimulated separately. Re-irrigation led to specific electrical signals followed by a gradual increase of gas exchange. In contrast, after heat stimulation of a leaf an electrical signal was evoked that reduced the net CO 2 -uptake rate as well as stomatal conductance. In the third stage, to elucidate how plants process simultaneous re-irrigation and heat stimulation, the drought-stressed maize plants were re-watered and heat-stimulated at the same time. Results showed a two phase response. In the first phase there was a rapid decrease in both the CO 2 uptake rate and the stomatal conductance, while in the second phase each of these parameters increased gradually. Thus, the results strongly support the view that the responses from both stimuli were combined, indicating that maize plants can process simultaneously applied stimuli. Copyright © 2018 Elsevier GmbH. All rights reserved.

  13. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    Energy Technology Data Exchange (ETDEWEB)

    Washinton TRU Solutions LLC

    2002-09-30

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2000, to March 31, 2002. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Field Office's (CBFO) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. In the prior BECR, the CBFO and the management and operating contractor (MOC)committed to discuss resolution of a Letter of Violation that had been issued by the New Mexico Environment Department (NMED) in August 1999, which was during the previous BECR reporting period. This Letter of Violation alleged noncompliance with hazardous waste aisle spacing, labeling, a nd tank requirements. At the time of publication of the prior BECR, resolution of the Letter of Violation was pending. On July 7, 2000, the NMED issued a letter noting that the aisle spacing and labeling concerns had been adequately addressed and that they were rescinding the violation alleging that the Exhaust Shaft Catch Basin failed to comply with the requirements for a hazardous waste tank. During the current reporting period, WIPP received a Notice of Violation and a compliance order alleging the violation of the New Mexico Hazardous Waste Regulations and the WIPP Hazardous Waste Facility Permit (HWFP).

  14. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    International Nuclear Information System (INIS)

    Washinton TRU Solutions LLC

    2002-01-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2000, to March 31, 2002. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Field Office's (CBFO) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. In the prior BECR, the CBFO and the management and operating contractor (MOC)committed to discuss resolution of a Letter of Violation that had been issued by the New Mexico Environment Department (NMED) in August 1999, which was during the previous BECR reporting period. This Letter of Violation alleged noncompliance with hazardous waste aisle spacing, labeling, a nd tank requirements. At the time of publication of the prior BECR, resolution of the Letter of Violation was pending. On July 7, 2000, the NMED issued a letter noting that the aisle spacing and labeling concerns had been adequately addressed and that they were rescinding the violation alleging that the Exhaust Shaft Catch Basin failed to comply with the requirements for a hazardous waste tank. During the current reporting period, WIPP received a Notice of Violation and a compliance order alleging the violation of the New Mexico Hazardous Waste Regulations and the WIPP Hazardous Waste Facility Permit (HWFP)

  15. Baseline avian use and behavior at the CARES wind plant site, Klickitat County, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, W.P.; Johnson, G.D.; Strickland, M.D.; Kronner, K.; Becker, P.S.; Orloff, S.

    2000-01-03

    This report presents a literature review on avian-wind turbine interactions and the results of a one-year avian baseline study conducted in 1998 at the proposed Conservation and Renewable Energy System (CARES) wind development site in Klickitat County, Washington. Avian use of the site ranged from 1.11/survey in the winter to 5.69/survey in the spring. Average use by passerines in the study plots ranged from 1.15 minutes/survey in the winter to 40.98 minutes/survey in the spring. Raptors spent much less time within plots than other groups, ranging from 0.05 minutes/survey in the winter to 0.77 minutes/survey during the fall. Thirteen percent of all flying birds were within the rotor-swept height (25 to 75 m); 41.6% of all raptors were flying at this height. Raptors with the greatest potential turbine exposure are red-tailed hawks and golden eagles. Passerines with the highest turbine exposure are common ravens, American robins, and horned larks. Spatial use data for the site indicate that avian use tends to be concentrated near the rim, indicating that placing turbines away from the rim may reduce risk. Avian use data at the CARES site indicate that if a wind plant is constructed in the future, avian mortality would likely be relatively low.

  16. Baseline avian use and behavior at the CARES wind plant site, Klickitat County, Washington

    International Nuclear Information System (INIS)

    Erickson, W.P.; Johnson, G.D.; Strickland, M.D.; Kronner, K.; Becker, P.S.; Orloff, S.

    2000-01-01

    This report presents a literature review on avian-wind turbine interactions and the results of a one-year avian baseline study conducted in 1998 at the proposed Conservation and Renewable Energy System (CARES) wind development site in Klickitat County, Washington. Avian use of the site ranged from 1.11/survey in the winter to 5.69/survey in the spring. Average use by passerines in the study plots ranged from 1.15 minutes/survey in the winter to 40.98 minutes/survey in the spring. Raptors spent much less time within plots than other groups, ranging from 0.05 minutes/survey in the winter to 0.77 minutes/survey during the fall. Thirteen percent of all flying birds were within the rotor-swept height (25 to 75 m); 41.6% of all raptors were flying at this height. Raptors with the greatest potential turbine exposure are red-tailed hawks and golden eagles. Passerines with the highest turbine exposure are common ravens, American robins, and horned larks. Spatial use data for the site indicate that avian use tends to be concentrated near the rim, indicating that placing turbines away from the rim may reduce risk. Avian use data at the CARES site indicate that if a wind plant is constructed in the future, avian mortality would likely be relatively low

  17. Reduction of negative environmental impact generated by residues of plant tissue culture laboratory

    Directory of Open Access Journals (Sweden)

    Yusleidys Cortés Martínez

    2016-01-01

    Full Text Available The research is based on the activity developed by teaching and research laboratories for biotechnology purposes with an environmental approach to determine potential contamination risk and analyze the residuals generated. The physical - chemical characterization of the residuals was carried out from contamination indicators that can affect the dumping of residual water. In order to identify the environmental risks and sources of microbial contamination of plant material propagated by in vitro culture that generate residuals, all the risk activities were identified, the type of risk involved in each activity was analyzed, as well as whether or not the standards were met of aseptic normative. The dilution and neutralization was proposed for residuals with extreme values of pH. Since the results of the work a set of measures was proposed to reduce the negative environmental impact of the laboratory residuals. Key words: biosafety, environmental management, microbial contamination

  18. Twenty-five years of environmental radionuclide concentrations near a nuclear power plant.

    Science.gov (United States)

    Harris, Charles; Kreeger, Danielle; Patrick, Ruth; Palms, John

    2015-05-01

    The areas in and along a 262-km length of the Susquehanna River in Pennsylvania were monitored for the presence of radioactive materials. This study began two months after the 1979 Three Mile Island (TMI) partial reactor meltdown; it spanned the next 25 y. Monitoring points included stations at the PPL Susquehanna and TMI nuclear power plants. Monthly gamma measurements document concentrations of radionuclides from natural and anthropogenic sources. During this study, various series of gamma-emitting radionuclide concentration measurements were made in many general categories of animals, plants, and other inorganic matter. Sampling began in 1979 before the first start-up of the PPL Susquehanna power plant. Although all species were not continuously monitored for the entire period, an extensive database was compiled. In 1986, the ongoing measurements detected fallout from the Chernobyl nuclear accident. These data may be used in support of dose or environmental transport calculations.

  19. Preliminary study of environmental parameters associated with the feasibility of a polygeneration plant at Kennedy Space Center

    International Nuclear Information System (INIS)

    Barnes, G.D.

    1982-01-01

    The feasibility of a polygeneration plant at Kennedy Space Center was studied. Liquid hydrogen and gaseous nitrogen are the two principal products in consideration. Environmental parameters (air quality, water quality, biological diversity and hazardous waste disposal) necessary for the feasibility study were investigated. A National Environmental Policy Act (NEPA) project flow sheet was to be formulated for the environmental impact statement. Water quality criteria for Florida waters were to be established

  20. Environmental Survey preliminary report, Savannah River Plant, Aiken, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Savannah River Plant (SRP), located at Aiken, South Carolina. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The following topics are discussed: general site information; air, soil, surface water and ground water; hydrogeology; waste management; toxic and chemical materials; release of tritium oxides; radioactivity in milk; contamination of ground water and wildlife; pesticide use; and release of radionuclides into seepage basins. 149 refs., 44 figs., 53 tabs.